Laserfiche WebLink
A&P CONSULTING TRANSPORTATION ENGINEERS, CORP. <br />GOLDEN SHORES PUMP STATION REHABILITATION (CCNA) <br />RFQ 18-11-01 <br />26 <br />APCTE has demonstrated its capability of obtaining permits for challenging projects; one example is the Miami Intermodal Center. Below is an in-house checklist of permits that is used as a reference as part of standard procedure in our office: <br />Permit Type Governmental Agencies <br />Florida Department of Transportation District <br />Six (FDOT–VI) <br />South Florida Water Management District <br />(SFWMD) <br />Environmental Protection Agency (EPA) <br />Miami-Dade Department of Environmental <br />Resources Management (DERM) <br />South Florida Water Management District <br />(SFWMD) <br />Miami-Dade Department of Transportation <br />and Public Works <br />Florida DEP <br />Miami-Dade Water and Sewer Department <br />(WASD) <br />Miami-Dade Transit Authority <br />Miami-Dade DERM <br />Miami-Dade Department of Environmental <br />Resources Management (DERM) Wastewater <br />Section <br />Miami-Dade Department of Environmental <br />Resources Management (DERM) Wastewater <br />Miami-Dade Fire Department <br />Florida DEP <br />Roadway <br />(Right-of-Way) <br />Environmental Resources <br />Permit (ERP) <br />USEPA General <br />Construction NPDES Permit <br />Class II Permit <br />Right of Way Notice <br />General Permit <br />Roadway <br />(Right-of-Way) <br />Environmental and <br />Dewatering <br />Force Main Extension <br />Roadway <br />(Right-of-Way) <br />Water Main Extension <br />Utility Permit (FAC 14-46) for Work within FDOT <br />Right of Way <br />Stormwater Management Systems (more than <br />40 Acres) <br />Construction that disturbs 1 acre or more <br />Stormwater Management Systems <br />Work within SFWMD Right of Way <br />Construction Permit for County Roads <br />NPDES <br />Final Review of Force Main <br />Construction Permit for work within the <br />Busway Right of Way <br />Class V (Temporary Dewatering) Permit <br />Permit to Construct Extension of Public <br />Sanitary Sewer System <br />Water Main Extensions <br />Water Main Extensions <br />Water Main Extensions <br />90 days <br />90 days <br />90 days <br />30 days <br />90 days <br />30 days <br />30 days <br />21 days <br />90 days <br />60 days <br />21 days <br />15 days <br />21 days <br />15 days <br />Estimated Time to Obtain PermitType of Project / Improvement