My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
A&P Consulting
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-11-01) Consult. Engin. Svs. for Golden Shores Pump Station Rehabilitation (CCNA)
>
Responses
>
A&P Consulting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 3:26:49 PM
Creation date
12/11/2018 2:50:14 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Pump Station CCNA
Bid No. (xx-xx-xx)
18-11-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> STANDARD FORM 330 <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME x 13. ROLE IN THIS CONTRACT x 14. YEARS EXPERIENCE <br />a. TOTAL x b. WITH CURRENT FIRM x <br />15. FIRM NAME AND LOCATION (City and State) X <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />• x <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />• x <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />APA National Economic Development Plan Award, Dade Heritage Trust Annual Preservation Award Little Havana National Treasure, <br />APA Florida 2016 Award of Excellence Wynwood Neighborhood Revitalization, 10th Annual KINPAN Award-China, Miami Herald, <br />Miami FL Character of Little Havana, Op-Ed, FitCity Miami 3/American Institute of Architects, Florida APA Annual Conference <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) Little Havana Revitalization, Miami, Florida (2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br /> <br />CONSTRUCTION (If applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Exclusive local planning studio for partnership with the National Trust for Historic Preservation that will preserve the authenticity of <br />Little Havana while providing policy recommendations for proper growth and development of a residential neighborhood in walking <br />distance of Downtown Miami. Revitalization plan includes design for healthy living, complete streets and multimodal transportation. <br />b. <br />(1) TITLE AND LOCATION (City and State) Hialeah Complete Streets Plan, Hialeah, Florida (2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />A Complete Streets plan was created to ensure that rail transit in two TODs is connected to wide sidewalks, safe street crossings, <br />bike lanes and public transit. Guidelines can be applied citywide to ensure dense, mixed-use districts will be served by multimodal <br />mobility. <br />c. <br />(1) TITLE AND LOCATION (City and State) Hialeah Transit Oriented Development Districts, Hialeah, Florida (2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Master plan and land-use policy for Transit Oriented Development (TOD) around the city’s Market District and Transfer rail <br />stations. Supports compact, mixed-use development around advantageous rail connectivity. Creates affordable housing with rail <br />connectivity to job centers throughout the County and region. <br />d. <br />(1) TITLE AND LOCATION (City and State) Lujiao Antler Town, Chongging, China <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Chongqing Antler Town is designed to set new benchmarks in senior living and sustainability, while harmoniously integrating the <br />surrounding landscape and built form. Located in the vicinity of Chongqing’s City Center, the site is served by several metro <br />trains and buses that connect it to the rest of the region. The advantage of mass transit is fully integrated into the design.. <br />e. <br />(1) TITLE AND LOCATION (City and State) Village of El Portal Form-Based Code, El Portal, Florida <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Creation of new municipal zoning ordinance. Recommendations focus on a mixed-use Town Center and corridor legislation that <br />will generate new economic sources and provide a destination for the Village. PlusUrbia translated the vision created by the Village <br />during its 2013 Charrette into a visual, user friendly and easy to review document known as a form-based code. <br />
The URL can be used to link to this page
Your browser does not support the video tag.