My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craig A. Smith
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(18-11-01) Consult. Engin. Svs. for Golden Shores Pump Station Rehabilitation (CCNA)
>
Responses
>
Craig A. Smith
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 3:27:16 PM
Creation date
12/11/2018 3:03:53 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Golden Shores Pump Station CCNA
Bid No. (xx-xx-xx)
18-11-01
Project Type (Bid, RFP, RFQ)
RFQ
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
@�A <br />Craig A. Smith & Associates, Inc. <br />Engineers • Surveyors • Subsurface Utility Engineering <br />3D Subsurface Imaging • Utility Coordination <br />• Project Design (Stormwater Pump Station Rehabilitation) <br />• Regulatory Permitting <br />• Contract Document Development <br />• Cost Estimation and Budget Support <br />• Cost/Benefit Analysis <br />• Bidding & Contract Award Services <br />• Technical Reporting <br />SURVEY <br />CAS Staff: Robert Keener, P.S.M., David Lookabill, Daniel Sousa, Donald Drake <br />• Allocate Survey Crews <br />• Conduct Survey <br />• Develop Topographic/Boundary, Right -of -Way, Utility Survey <br />• Legal Description & Easement Recording <br />• Coordinate with Utility Locating Crews <br />SUBSURFACE UTILITY ENGINEERING (UTILITY LOCATES) <br />CAS Staff: James F. Driscoll, Raul Carbonell <br />• Vacuum Potholes (Soft Digs) <br />• Electromagnetic Induction (EM) for tonable utilities <br />• 2-D Ground Penetrating Radar (GPR) <br />• 3-D Radar Tomography Scanning <br />CONSTRUCTION MANAGEMENT & INSPECTION <br />CAS Staff: James R. Orth, P.E., Orlando Rubio, PE., Tony Gomes, William Tanto <br />• Schedule Pre -Construction Meeting <br />• Schedule Construction Progress Meetings <br />• Provide Inspection of Materials <br />• Provide Inspection during Construction <br />• Provide Daily Construction Log <br />• Field Adjustments/Trouble Shooting <br />• Process Contractor Payments/Change Orders <br />• Develop Final Punch List <br />• Pump Station Start-up & Testing <br />• Certification of Work/Permit Close -Out <br />• Project Close -Out <br />Note: Staff In Italics are supporting personnel. <br />21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 <br />34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.