Laserfiche WebLink
41 <br />1) TITLE AND LOCATION (City and State) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (tfApplicable) <br />FDOT 1-95 Stormwater Pump Station <br />Pembroke Park, Florida <br />2001 <br />2002 <br />k <br />3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />Survey, utility locates, preparation of design plans, cost estimates, permitting, bidding, <br />construction management and construction observation, survey as-builts and <br />certification through project close-out for the Interstate 95 Master Stormwater Pump <br />Station project, located within Pembroke Park. The project was designed to alleviate <br />flooding in both Pembroke Park and Hallandale Beach and was paid for by FDOT. The <br />project included an 84 -inch drainage pipe, micro -tunneling, pump station with four (4) <br />pumps (200 HP motors) each capable of 40 CFS, a ditch along the Tri -Rail corridor <br />construction and dredging at the C-10 canal. This project was on a fast track from <br />preliminary design to construction; completion took only 25 months. Project Cost: <br />$10,976,931 <br />1) TITLE AND LOCATION (City and Stare) <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (tfApplicable) <br />City of Sweetwater Stormwater & Pump Station <br />Improvements (Phase I & III) <br />2000 <br />2004 <br />Sweetwater, Florida <br />3) BRIEF DESCRIPTION (Briefscope, size, cost etc.)AND SPECIFIC ROLE X Check if project performed with current firm <br />The project consisted of 115 structures, 7,400 linear feet of drainage pipe ranging in <br />size from 15 -inch to 72 -inch, 7,325 linear feet of stormwater force main ranging in size <br />from 24 -inch to 48 -inch, four (4) duplex stormwater pump stations, roadway <br />restoration and complete reconstruction of 2,500 linear feet of NW 112th Avenue. <br />Construction cost: $7,058,530 <br />41 <br />