My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Azulejo Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 18-11-02 Bus Shelter Relocation and Refurbishing
>
Responses
>
Azulejo Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 4:09:14 PM
Creation date
12/11/2018 3:32:55 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Bus Shelter Relocation and Refurbishing
Bid No. (xx-xx-xx)
18-11-02
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ANA MILENA SALAZAR <br /> Certified General Contractor CGC1518199 <br /> Certified Home Inspector HI5272 <br /> IW <br /> Leed Green Associate <br /> Adjuster-All lines W141718 <br /> Phone:(954)682-9855 <br /> 'absgdinc@live com <br /> Project Manager/Estimator <br /> Accomplished and results oriented professional with over 20 years of experience in manager construction <br /> Industry.Demonstrated effectiveness handling,planned,and directed civil engineering projects such as <br /> commercial,federals and residential buildings,water and sewer distribution system. <br /> SUMMARY OF SKILLS: <br /> Project Manager Assigned work Scheduled Estimated <br /> Inspected Negotiated Contracts Ensured Compliance Designed <br /> Implemented Quality Controls Performed Safety standards Interpreted specifications AUTOCAD <br /> Performed Reports Florida Building code Evaluated Microsoft Office <br /> Supervised Expediting City Permits Analyzed Blue prints Spanish/English <br /> ACCOMPLISHMENTS: <br /> • More than 1000 of Wind Mitigation Inspections. <br /> • Estimated projects obtained 50%of the contracts. <br /> •. Managed projects exceeding Five Million dollars. <br /> • Consolidated the Department of Installations with 50 employees and subcontractors. <br /> • Supervised projects of 508,436.00 sf. <br /> • Increased the standards of quality and optimized the resources. <br /> EXPERIENCE: <br /> ) AZULEJO INC. General Contractor Hallandale Beach—Fl <br /> Project Manager: August 2014—Present <br /> INSPECTION DEPOT Jacksonville,Fl <br /> • Insurance Inspector (Under Contract) May 2011—August 2014 <br /> Perform in the field Wind Mitigation Inspections.Remediation Inspection and submit the reports to Citizen's Insurance. <br /> FLORIDA WIND STORM INSPECTION Deerfield Beach,Fl <br /> • Insurance Inspector (Under Contract) November 2010—March 2011 <br /> AVCO Painting Coral Gables,Fl <br /> • Estimator/ Supervisor(Under Contract) August 2009—May2010 <br /> ABS GENERAL CONTRACTORS INC Pembroke Pines,Fl <br /> Owner/Manager July 2009—Present <br /> AZULEJO INC. General Contractor North Miami—Fl <br /> Estimator/Project Manager: May 2007—November 2008 <br /> • Analyzed blue prints,calculated direct and indirect costs.Studied all information available to determine material,equipment and labor <br /> requirements for the estimates. Coordinated and elaborated budgets. <br /> • Planned, directed,scheduled,and executed projects. Monitored and controlled construction by helping superintendent meet goals and <br /> ensure project remains on schedule and within budget.Reviewed contractor submittals during construction phase of project.Purchased <br /> materials and hired trade contractors. <br /> • Supervised the quality the works and subcontractors or employees accomplish with safety and security procedures and uses equipment <br /> and materials properly. <br /> • Interfaced with architect and engineering consultants on product development.Represented company or assist in project,labor,vendor <br /> and strategy meetings. <br />
The URL can be used to link to this page
Your browser does not support the video tag.