My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Azulejo Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 18-11-02 Bus Shelter Relocation and Refurbishing
>
Responses
>
Azulejo Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 4:09:14 PM
Creation date
12/11/2018 3:32:55 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Bus Shelter Relocation and Refurbishing
Bid No. (xx-xx-xx)
18-11-02
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
qlb <br /> • inc.com 20200 West Dixie Hwy. Suite 805-A <br /> aZule O Aventura, FI 33180 <br /> (305)895-4110 Fax(954) 454-9424 <br /> general <br /> contractor <br /> 2008 Atkins Courthouse $472,000 US Marshalls clearance required, Lydia Domenech <br /> Miami, Fl Interior Renovations in 9`h floors of (202)5010543 <br /> building. lydia.domenech@gsa. <br /> Replace carpet,wall papers, Add v <br /> insulation panels in Jury Chambers, <br /> Courtrooms and Administrative <br /> Offices. Restore and stain wood <br /> panels and chair rails of Jury stage. <br /> Relocate electrical outlets, lighting, <br /> smoke detectors and fire strobes <br /> with the new layout. Relocate <br /> sprinklers heads. Install VCT and <br /> paint. <br /> 2008 Planters and $250,000 Furnish and install quantity of 17 Chris Harris <br /> Bollards at Brickell rectangular planters on the front (305) 536-5751 <br /> Federal Building, (west) side of lenita.harris@gsa.gov <br /> USCG - Miami, Fl the building and 2 rectangular <br /> planters on the south side of the <br /> building. Planter <br /> size is 96"long x 48"wide x 36"high, <br /> each weighing 4,300 pounds. <br /> Total weight 81,700 pounds. <br /> Furnish and install 97 each <br /> Removable Bollards on the back <br /> (east) side of the <br /> building, each weighing 310 <br /> pounds. Total weight 30,070 <br /> pounds. <br /> 2007 USCG CEU Miami $233,749 Replacement of Emergency Sherry Dague <br /> Replacement Generator (305)2786721 <br /> Emergency sherry.c.dague@uscg. <br /> Generator. Miami, Fl <br /> 2006 Key West Naval $437,350 Lead Abatement on over 100 Steve Chan <br /> Base houses. Install new VCT flooring. (305)2932902 <br /> VCT Replacement Custom build new baseboards and ChanST@efdsouth.na <br /> Approx. 100 moldings. Replace windows and ac.navy.mil <br /> Housing Units. doors. Paint interior and exterior. <br /> Key West, Fl. Project Size: 60,000 SQ <br /> Page 10 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.