My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sagaris
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 18-11-02 Bus Shelter Relocation and Refurbishing
>
Responses
>
Sagaris
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2018 4:07:09 PM
Creation date
12/11/2018 4:05:41 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Bus Shelter Relocation and Refurbishing
Bid No. (xx-xx-xx)
18-11-02
Project Type (Bid, RFP, RFQ)
RFP
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sagaris Corp. <br /> 1847 N University Dr. <br /> Atif `�� Coral Springs, Fl 33071 <br /> ' AGARIS 954.688.3407 <br /> Corp <br /> office@sagariscorp.com <br /> B. Qualifications <br /> Sagaris Corp. is a Florida state certified general contractor with a proven track record of <br /> projects completed on-time and on-budget in South Florida. Please refer to the attached <br /> references and project history list for our most recent projects. <br /> C. Staffing <br /> Project manager assigned to this contract is Steven Fouladi, CGC. Please refer to <br /> attached resume. <br /> D. Approach /Methodology <br /> Sagaris Corp will take a systematic approach to each bus shelter location. Identifying, <br /> and logging underground utilities, irrigation, buried fixtures, landscaping and private <br /> owner property prior to excavation. Area behind bus shelter will be prepared prior to <br /> relocation of bus shelter. If applicable, FDOT MOT permitting will be submitted. The <br /> equipment we possess to complete the work include MOT devices, combination/loader, <br /> backhoe, roller, dump trucks, pickup trucks, flat bed trucks, roller, and hand compactors. <br /> Work to be completed in a timely manner with the least impact to pedestrian and/or <br /> vehicular traffic. <br /> E. Skipped on "Section 4 - Proposal Format" <br /> F. Contractor's References and Similar Work Completed <br /> Contract No(1): NE 13`h Roadway Improvements Project <br /> Client: City of Fort Lauderdale <br /> Ms. Christine Fanchi, PE <br /> Transportation& Mobility Department <br /> 290 NE 3rd Ave, Fort Lauderdale, FL 33301 <br /> 954.828.5226 <br /> cfanchi@fortlauderdale.gove <br /> Principle/Project Manager: Steven Fouladi, CGC/Sagaris Corp <br /> Contract Type: Prime <br /> City of Sunny Isles Beach—Proposal for 18-11-02—Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.