My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2013-2040
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2013
>
Reso 2013-2040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2013 11:11:10 AM
Creation date
4/11/2013 10:43:30 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2013-2040
Date (mm/dd/yyyy)
04/09/2013
Description
Approve 3rd Amend/Design-Build Agmt w/ 4M Investors, LLC.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERNATIONAL GENERAL CONTRACTOR <br />Project Gateway Park -Pedestrian Bridge Date: 02116112 <br />Location: City of Sunny Islas Beach, Florida <br />Park Cost Estimate Summary <br />a <br />No <br />Item Description <br />Unit e <br />Coat / Unit <br />Total <br />Remarks <br />2000 <br />SITEWORK <br />Sod (Installed) <br />10,000 <br />SF <br />1.00 <br />10,000.00 <br />Plaza / Walkways (pavers) <br />,4,000 <br />SF <br />7.00 <br />28,000.00 <br />Drainage / Site Utilities <br />1 <br />UN <br />60,000.00 <br />60,000.00 <br />Landscape Planting <br />1 <br />UN <br />50,000.00 <br />50,000.00 <br />Allowance <br />Bridge Installation - Site related costs <br />1 <br />UN <br />75,000.00 <br />75,000.00 <br />3000 <br />CONCRETE <br />Concrete /Masonry - Towers <br />2 <br />UN <br />1 275,000.00 <br />550.000.00 <br />Including towdatbns <br />4000 <br />MASONRY <br />CMU - Included under Concrete <br />0.00 <br />6000 <br />METALS <br />Metal Panels / Screens <br />1 <br />UN <br />90,000.00 <br />90,000.00 <br />Stairs <br />2 <br />UN <br />70,000.00 <br />140,000.00 <br />6000 <br />CARPENTRY / WOOD 8. PLASTIC <br />Included under Concrete <br />0,00 <br />7000 <br />THERMAL MOISTURE <br />Included under Concrete <br />0.00 <br />8000 <br />DOORS S WINDOWS <br />Metal Doors <br />2 <br />UN <br />2,000.00 <br />4,000.00 <br />8000 <br />FINISHES <br />Stucco - Included under Concrete <br />0,00 <br />Paint <br />1 1 <br />UN 1 <br />20,000.00 <br />20,000.00 <br />10000 <br />SPECIALTIES <br />Not Applicable <br />0.00 <br />11000 <br />EQUIPMENT <br />Not Applicable <br />0 <br />0.00 <br />Page 1 of <br />SIB <br />Agend' a"Cferli - 3 <br />Date 3 - 27S' 12.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.