Laserfiche WebLink
INTERNATIONAL GENERAL CONTRACTOR <br />Project Gateway Park -Pedestrian Bridge Date: 02116112 <br />Location: City of Sunny Islas Beach, Florida <br />Park Cost Estimate Summary <br />a <br />No <br />Item Description <br />Unit e <br />Coat / Unit <br />Total <br />Remarks <br />2000 <br />SITEWORK <br />Sod (Installed) <br />10,000 <br />SF <br />1.00 <br />10,000.00 <br />Plaza / Walkways (pavers) <br />,4,000 <br />SF <br />7.00 <br />28,000.00 <br />Drainage / Site Utilities <br />1 <br />UN <br />60,000.00 <br />60,000.00 <br />Landscape Planting <br />1 <br />UN <br />50,000.00 <br />50,000.00 <br />Allowance <br />Bridge Installation - Site related costs <br />1 <br />UN <br />75,000.00 <br />75,000.00 <br />3000 <br />CONCRETE <br />Concrete /Masonry - Towers <br />2 <br />UN <br />1 275,000.00 <br />550.000.00 <br />Including towdatbns <br />4000 <br />MASONRY <br />CMU - Included under Concrete <br />0.00 <br />6000 <br />METALS <br />Metal Panels / Screens <br />1 <br />UN <br />90,000.00 <br />90,000.00 <br />Stairs <br />2 <br />UN <br />70,000.00 <br />140,000.00 <br />6000 <br />CARPENTRY / WOOD 8. PLASTIC <br />Included under Concrete <br />0,00 <br />7000 <br />THERMAL MOISTURE <br />Included under Concrete <br />0.00 <br />8000 <br />DOORS S WINDOWS <br />Metal Doors <br />2 <br />UN <br />2,000.00 <br />4,000.00 <br />8000 <br />FINISHES <br />Stucco - Included under Concrete <br />0,00 <br />Paint <br />1 1 <br />UN 1 <br />20,000.00 <br />20,000.00 <br />10000 <br />SPECIALTIES <br />Not Applicable <br />0.00 <br />11000 <br />EQUIPMENT <br />Not Applicable <br />0 <br />0.00 <br />Page 1 of <br />SIB <br />Agend' a"Cferli - 3 <br />Date 3 - 27S' 12.) <br />