HomeMy WebLinkAboutReso 2013-2087RESOLUTION NO. 2013 - 2081
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF
SUNNY ISLES BEACH, FLORIDA, APPROVING CHANGE ORDER
NO.2 TO AGREEMENT WITH SPORTS TURF ONE, INC. FOR THE
INSTALLATION OF ARTIFICIAL TURF IN THE PELICAN
COMMUNITY PARK PLAYGROUND, IN AN AMOUNT NOT TO
EXCEED FORTY -FOUR THOUSAND NINE HUNDRED THIRTY -
SEVEN DOLLARS (S44,937.00), ATTACI IED HERETO AS EXHIBIT
"A "; AUTHORIZING THE CITY MANAGER TO DO ALL THINGS
NECESSARY TO EFFECTUATE THIS RESOLUTION; PROVIDING
FOR AN EFFECTIVE DATE.
WHEREAS, due to the high volume of use of the fields at the Senator Gwen NMareolis Park
and the Pelican Community Park, it was necessary to replace the natural turf with quality artificial
turf. and the City issued and advertised Request for Proposals No. 12- 10 -03, to furnish and install
artificial turf at these two locations. for which seven (7) responses were received; and
WHEREAS, on February 21. 2013 via Resolution No. 2013 -2024 the City Commission
approved an Agreement with Sports Turf One. Inc. to furnish and install artificial turf in the Senator
Gwen NMargolis and Pelican Community Parks. in an amount not to exceed Nine Hundred Ten
Thousand Seven Hundred Forty -Two Dollars ($910,742.00); and
WHEREAS, the City now needs to remove and dispose of existing rubberized surface and
underlying shock absorption material in the existing playground area at Pelican Community Park. and
replace it with new shock absorption material and artificial turf; and
WHEREAS. based on price, qualifications, experience and the ability to meet the imposed
timeframe for installation. Sports Turf One. Inc. is willing and able to do the desired services and has
submitted a proposal in an amount of Fort-Four Thousand Nine Hundred Thirty-Seven Dollars
($44,937.00), bringing the total contract amount to One Million One Hundred Thirty -One Thousand
Seven Hundred Forty -Two Dollars and Ninety -Two Cents (S 1.131.742.92); and
WHEREAS, the City Commission wishes to approve Change Order No. 2 to Agreement with
Sports Turf One. Inc. for said services at Pelican Community Park. in an amount not to exceed Fortv-
Four Thousand Nine Hundred Thirty -Seven Dollars (S44.937.00). attached hereto as Exhibit "A ".
NOW THEREFORE, BE IT RESOLVED BY THE CITY CON MISSION OF THE
CITY OF SUNNY ISLES BEACH, FLORIDA, AS FOLLOWS:
Section L Approval of the Change Order No. 2 to Agreement. The City Commission hereby
approves Change Order No. 2 to Agreement with Sports Turf One. Inc. to install Artificial Turf in
the Pelican Community Park Playground, in an amount not to exceed Forty -Four Thousand Nine
Hundred Thirty -Seven Dollars (S44,937.00). attached hereto as Exhibit "A ".
Section 2. Authorization of City Manager. The City \Manager is hereby authorized to do all
82013. Sports Turf One Change Order 2 PCP and TCP Page I of 2
things necessan, to effectuate this Resolution.
Section 3. Effective Date. This Resolution will become effective upon adoption.
PASSED AND ADOPTED this 18`h day of Julv 2013.
ATTEST:
Jane 'A. Hines. CMC. City Clerk
APPROVED AS TO FOWM
AND LFi6L SUFFICIENCY:
Moved by: VI 1 ► \0.t Dv- F r," Uk)
Seconded by: (Inyyyyt ��(_�
Vote: 5 -b
Mayor Edelcup ✓ (Yes) (No)
Vice Mayor Aelion (Yes) (No)
Commissioner Gatto ✓ (Yes) (No)
Commissioner Levin ✓(Yes) _(No)
Commissioner Scholl (Yes) (No)
R 2013- Sports Turf One Change Order 2 PCP and TCP Page 2 of 2
SJN_N.Y IS4
� F
n
F L 09'
P
C,TY OF SUN Pao
CITY OF
SUNNY ISLES BEACH
CHANGE ORDER NUMBER:
BID NUMBER: 12 -10 -03
RESOLUTION NUMBER: 2013-
CHANGE
ORDER NO. 2
DATE: July 3, 2013
PROJECT:
Artificial Turf in City Parks
ORIGINAL DOLLAR CONTRACT AMOUNT:
$ 910 742.00
NET TOTAL DOLLAR VALUE OF ALL PREVIOUS CHANGE ORDERS:
176 063.92
DOLLAR AMOUNT OF THIS CHANGE ORDER:
$ 44 937.00
CREDIT /DIRECT PURCHASES:
0.00
NEW DOLLAR CONTRACT AMOUNT:
$1,131,742.92
ORIGINAL CONTACT COMPLETION DATE
August 16 2013
TOTAL OF PREVIOUS CHANGE ORDER DAYS:
0
AMOUNT OF DAYS PER THIS CHANGE ORDER:
0
NEW CONTRACT COMPLETION DATE:
August 16, 2013
DESCRIPTION OF SCOPE OR WORK CHANGES:
Remove and dispose of existing rubberized surface and underlying shock absorption
material /underlayment in the existing playground area at Pelican Community Park and replace
with new shock absorption material and artificial turf (including infill). Area is approximately
2,600 square feet. No additional contract time for this Change Order.
NOTE: Unless specifically stated clearly elsewhere on this page, this change order does NOT include an extension
of time or grant any additional general conditions amounts. The City and the Contractor agree that the contract
time adjustment and sum agreed to in this document constitute a full and complete settlement of the matters set
forth herein, including all direct and indirect costs for equipment, manpower, materials, overhead, profit and delay
relating to the issues set forth in this document.
CONTRACTOR
Sorts Turf One Inc.
%
CITY ATTORNEY:
Hans Ottinot
PROJECT MANAGER:
Helen Gray
CITY MANAGER:
Christo her J. Russo
o - -
SPORTS TURF ONE INC.
9819 STATE ROAD 7
BOYNTON BEACH, FL 33472
561- 369 -7994 OFFICE
561- 364 -1118 FAX
CITY OF SUNNY ISLES BEACH
18070 COLLINS AVE.
SUNNY ISLES BEACH, FL 33160
ESTIMATE
4/1/2013
2013 -514
A CKV
OR LEDGES ACCEPTANCE OF PRICE
TERMS & CONDITIONS. %nature
DATE —
Terms R
Rep C
Contact P
Phone F
Fax
Due on receipt B
BG H
HELEN GRAY 3
305.792 -1913
Description Q
Qty C
Cost T
Total
PELICAN PARK PLAYGROUND AREA
RESTORATION..
WE PROPOSE TO PROVIDE ALL LABOR AND
MATERIALS FOR THE REMOVAL AND
REPLACEMENT OF THE SURFACE AREA IN AND
AROUND THE PLAYGROUND EQUIPMENT AT
PELICAN COMMUNITY PARK. +1- 2600 SO FT TOTAL
AREA SIZE
INCLUDED: REMOVAL OF AND LEGAL DISPOSAL OF
EXISTING IN PLACE SURFACE MATERIAL. ALL
SURFACE PREPARATION TO ACCEPT NEW
PRODUCT. SUPPLY AND INSTALL POURED IN
PLACE BASE SHOCK MATERIAL. THE TURF LAYER
IS "A- TURF / TOP TURF" A 225" PILE HEIGHT ALL
RUBBER INFILL, TWO COLOR BLENDED 500Z
SYNTHETIC TURF WITH AN 8 YEAR WARRANTY
THE PROPOSED PRODUCT IS CERTIFIED FOR AN 8-
FALL HEIGHT VIA THE.. US CPSC HANDBOOK FOR
PUBLIC PLAYGROUND SAFETY
PRICE PER LUMP SUM BASED ON ABOVE SCOPE.... 1
1 4
44,937.00 4
44,937.00
Total $
$44,937.00
SIGNING THIS PROPOSAL A
OR LEDGES ACCEPTANCE OF PRICE
TERMS & CONDITIONS. %nature
DATE —
.1' or S.'H n_
City of Sunny Isles Beach
18070 Collins Avenue
Sunny Isles Beach, Florida 33160
(305) 947 -0606 City Hall
(305) 949 -3113 Fax
MEMORANDUM
TO: The Honorable Mayor and City Commission
VIA: Christopher J. Russo, City Manager
FROM: Helen Gray, PE, City Engineer
DATE: 7/18/2013
RE: A Resolution Approving Change Order No. 2 with Sports Turf
One, Inc. for the Installation of Artificial Turf at the Pelican
Community Park Playground
RECOMMENDATION:
We recommend City Commission approve the Resolution.
REASONS:
In February 2013, City Commission authorized the City Manager to negotiate
and enter into, an agreement with Sports Turf One, Inc. to furnish and install
artificial turf at Gwen Margolis Park (GMP) and Pelican Community Park (PCP)
in an amount not to exceed $1,100,000. Contract No. C1213 -008 encompassed
the base bid for the two fields in the amount of $910,742.00. During the course of
construction, several items were added to the project resulting in Change Order
No. 1. Change Order No. 1 included adding area lighting, miscellaneous side
walk repairs (pre- existing damage) and gate reconstruction at GMP, converting
the batting cages to artificial turf and fence repair /replacement at PCP and the
purchase of one electric vehicle to pull the turf maintenance equipment
(maintenance equipment furnished per original contract). The amount of Change
Order No. 1 was $176,063.92 which increased the total contract amount to
$1,086,805.92.
Given the deteriorating condition of the safety surface at the PCP playground,
the City requested and obtained a cost proposal from Sports Turf One, Inc. to
replace the existing safety surface with artificial turf. This additional work is the
Agenda Item No. 101
Date 7/182013
150
sole item included in Change Order No. 2 at a cost of $44,937.00 and is required
to be completed after the PCP field is available for use and before school opens
in August.
Future additional work that is being negotiated for future consideration by City
Commission will include the installation of artificial turf in a defined area of Town
Center Park. In general, the area will include within the existing playground,
swing set, and exercise station areas on the south side of the park.
�i &H
Not to exceed $44,937.00 from Account No. 20.600 -5611.
FUNDING SOURCE:
Account No. 20.600.5611
ATTACHMENTS:
• Resolution
• Change Order No. 2
A¢enda Item No. 101
Date 7/18/2013