Loading...
HomeMy WebLinkAboutLynx Construction ManagementL ]CO N X CONSTRUCTION MANAGEMENT CITY OF SUNNY ISLES BEACH Government Center 18070 Collins Avenue, 41h Floor Sunny Isles Beach, FL 33160 OR16INAL RECEIVED 1 �o� 26:33 DESIGN BUILD SERVICES FOR �" ak owe ''dr 1 GATEWAY PARK PEDESTRIAN ACCESS IMPROVEMENTS STEP 1 Request for Qualifications No. 13 -08 -01 UMCHARRYASSOCIATES Opening: September 04, 2013 at 3:00pm FL: CGC1518494 M5: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 FL:CMC1250004 NC:69344 0:305.523.3656 1 F: 888.499.1748 1 LynxConstructionManagement.com TN: 63012 L cx `/cON$ RUCT�I N MANAGEMENT Table of Contents 1. Company Information • Name of Agency /Company (including any "Doing Business As" names) • Company Locations • Internet Web Site Address (if any) • Details of Entity Business Structure (Corporation, Partnership, LLC) • Date Founded • Home office address, telephone number, and local address and phone number • List of any outstanding litigation that would threaten the viability of the firm or the performance of this contract • Indication of how long it would take to implement service after authorized to begin • Proof of insurance 2. Qualifications 3. Staffing 4. Approach / Methodology 5. References 6. Office Locations 7. Contract Forms 8. Additional Information • Licenses • Bond Letter 2 4 14 38 43 50 51 63 1 FL CCC1518484 M5: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 1 of 66 FL CMC1250004 NC: 69344 O: 305.523.3656 1 F: 888.499.1748 1 LynxConstructionManagement.com RFQN 13 -08 -01 TN: 63012 L �X -/CONSTRUCTION MANAGEMENT 1. COMPANY INFORMATION Name of Agency /Company (including any "Doing Business As" names) Lynx Construction Management, LLC Company Locations Corporate Headquarters: 45 Almeria Avenue Coral Gables, FL 33134 Miami Beach Satellite Office: 5149 Alton Road Miami Beach, FL 33140 Internet Web Site Address (if any) www .LvnxConstructionServices.com Details of Entity Business Structure (Corporation, Partnership, LLC) Limited Liability Company organized in the State of Florida Date Founded August 1, 2008 Home office address, telephone number, and local address and phone number Address: 45 Almeria Avenue Coral Gables, FL 33134 Phone: (305) 523 -3656 Fax: (888) 499 -1748 Email: info(@Lvnxcs.com List of any outstanding litigation that would threaten the viability of the firm or the fperformance of this contract None. Indication of how long it would take to implement service after authorized to begin Lynx can start the design phase immediately after authorized to begin and we estimate the tdesign and construction can be completed in 314 calendar days. - FL: CGC1518484 M5: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 2 of 66 FL: CMC1250004 NC:69344 0:305.523.36561 F: 888.499.17481 LynxConstruction Management.com RFQ #13 -08 -01 TN: 63012 I 1.1 I I I n LI CON STRUCTION MANAGEMENT Proof of insurance /—"4 LYNXCON -01 SSIMEON 4`'RO. CERTIFICATE OF LIABILITY INSURANCE ;VW20 " THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURERISL AUTHORVED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER- IMPORTANT: U the cenfil te holder is an ADDITIONAL INSURED, Ore poliry(ias) must Be endorasd. N SUBROGATION IS WANED, suhlea to the terms ai conI itiom of the policy, certain Policies may require an eMOraanlem. A statement on Nis cenlrleate doss not confer rights W the PaARCare holder In lieu of such endomememis). rmolncan I I CoDhnswol[IL Alter, Fowler d French, LLC mss Square 8" ,,C°�"' 305 822 -7800 1 305 J62 -2043 1 4VS Mn s.¢I_) 1 ..IKi_) State 301 Elm_ 1 sUZrrd Lakes, FL 33016 Au,Tro.leffnREPRYlMA. I wsuREma AFSOwwc wlERACE I xAC. I ACORD 25 (20IWG5) I wsuau A: First Mercurl lm. Corn Parry 110657 I wwam e: MassachllseLb Ball lm Co 1 le Ly ComuucUOn Management, LLC .. c: Commerce 8lndunW Ins. Co. 109317 19410 I 45 Almeria Avenue 1 amount. - ARIeri9ure Insurance Co 119488 Coal Gables, FL 131M I waleER E: I IwWm r: I I COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY TII T THE POLICIES OF INSURANCE LISTED BELOWHAVE BEEN ISSUED TO THE WSURE , NAk1ED ABOVE FOR THE POLICY PERIOD WDIGTED NOTV4TIiUMMG ANY REONREMENT, TERN OR CONDITION aF ANY CONiRACTOROTI ER DOCUMENT V4n1 RESPECT TO VABLH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE WSU.E AFFORDED BY THE POLICIES DESCRIBED HEREIN IB SUEUE(! TO. THE TERMS, El(CLUSM]NS AND CONDITIONS OF SUCH POLICIES LIMBS SHORN MAY HAVE BEEN REDUCED BY PAID CWMS - ELmren r]PEmwsueua __ AeDLa^e — wa1 ww!— _!ouc ±.uoEn, 'roucr ESS-r wxcr ESl Roumr..Y1.Iw,mYYnl.1 — -- U.,! EDIM4L UAaun EwcN OCCURRENCE 1s 1,000.000 A X CCaaERCML GENERAL LMe4m WCGLOODOW243902 122L2012 1L22/1013 pq romp a - -I� - -- 50,000 _IJ twrsauBe Q% occw I MED EVµ,r % Bikl Atltl9 Wurad I PERaor u4Aweuan, 1! 1,000,000 WaNer _ 1 I oEwp LAaaE n I $ 2.000,000 XIBlkt GFNt xDDR MtaurA ESPER I I IpnnglCie- CpP.OP MX:Is _ 2,000,000 __ Parr n_(_; Per Project Cap I s 5,000,000 1rrr.���uivamae uAeam IAW980089000 I IE._ T I , 1,000,000 8 Axr AUm 1=0121 IMMO131 aooaYNAMYowPxrwR 15 uLOwEn NmM IpEVMTOS Ix aGEDUIED AW05 BDRYatIIM'IPwamigl! f - _� NIiW R IS I _ - - j! _ VL1D18 x +EnSal %IaASaarroEl occw :BE0457136W - 1 LE ocaw+0¢E Is 5,000,000 C uAe I _ 12F221!011 1=2013 I AOaR M 1s 5,000,000 I or:o I I nEiENiCN! I I Is I IwOWIEAl CDaPExS/.i1Dx wrOEMOYE1151LeMY 1 I Y I NCSTATU- IOM1 "Iipll LaaT51 ER I D Ylx PROwMloRSUnr<etvEaerlW — WC208190501 312912012 _ I 1_1 MI• L29]2013 FACN AgpENr 15 1,000,W0 IOfrCFPYFIEAFIfRLCfDI laaamvy w all I �EL EL gsEwa: -Eve FIHOYEE 5 _ _ 1.000.000 1 CEs SC=RVIgx OF 0FO OI£RATILWS .M i I I 1 I E L 001EmE. POLICY Lear 15 I I 1,000,000 oIXlalnd CS DPFe1i1{xIl ILOCAiGxII VEXCLE3 1AVwnAWRp iM. AMbW IWn. MA,Ew, lmu. yr.M,yaMl CERTIFICATE HOLDER CANCELLATION FL: CGC1518484 MI: 111124-MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 3 of 66 FL: 6301250004 NC: 69344 TN: 63012 O: 305.523.3656 1 F: 888.499.1748 1 LynxConstructionManagement.com RFQ# 13 -08 -01 Sl O ANY OF THE ABOVE OEREOF. D E9 BE CANCELLED BED City of Sunny Isles Beach EI THE EItPmATION OATS THEREOF, NOTICE WBL BE DfINFRm W OM IN 18070 Collins AVenua ACCORDANCE WITH T11E POLICY PROVISN)NS 3rd Floor Sunny Islas Beach, FL 331W Au,Tro.leffnREPRYlMA. 0198&2010 ACORD CORPORATION. AD rights reserveA. ACORD 25 (20IWG5) The ACORD name arld logo are registered marks of ACORD FL: CGC1518484 MI: 111124-MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 3 of 66 FL: 6301250004 NC: 69344 TN: 63012 O: 305.523.3656 1 F: 888.499.1748 1 LynxConstructionManagement.com RFQ# 13 -08 -01 k 1 V E 1 I P fl 1 L N x .� CONSTRUCTION MANAGEMENT 2. QUALIFICATIONS Lynx Construction Management has arranged the best qualified team to perform this contract. The team far exceeds the requirements of this RFQ. Some of what Lynx brings to the table is its vast financial and bonding capacity, as well as the design -build experience and previous project involvement with the team. Lynx's principals have a long history and have worked with M.C. Harry for 20 years and currently working together on two projects. The firm has all the necessary licenses and insurance to perform the project. Team The team is comprised of the following: Architect: M.C. Harry and Associates, Inc Bridge Supplier: Contech Engineered Solutions, LLC Construction Manager: Lynx Construction Management, LLC MEP Engineer: SDM Consulting Engineers, Inc Structural Engineer: Bliss & Nyitray, Inc Schedule of Proposed Services 1 1. Pre - design 14 days a) Survey, site investigation, utility location 2. Design a) Schematic Design /Concept Renderings 30 days b) Design Development (30% CD) 30 days c) Contract Documents 90 days 3. Permitting 30 days a) Building, DOT, Derm approval 4. Construction 120 days Team Projects The following is a sample of the current and previous projects and past experience: All Children's Hospital. St. Petersburg, Florida 150 ft glass- enclosed bridge, connecting two hospital buildings American EXnress Reeional Headauarters. Fort Lauderdale, Florida 225 ft covered bridge connecting parking garage to office building fL: CGC1518484 M5: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 4 of 66 FL: CMC1250004 NC: 69344 O: 305.523.3656 1 F: 888.499.1748 1 LynxConstructionManagement.com RFQ# 13 -08 -01 TN: 63012 I r [1 r L k 11 C 1 L N IO CONSTRUCTION MANAGEMENT Baptist /Nemours. Jacksonville, Florida The structure connects the fourth floors of the two medical facilities, providing a safe, comfortable access between the two buildings. Framed with structural steel, the center span of the enclosed bridge exceeds 200 feet in length as it crosses 1 -95, supported by a tension stay assembly and concrete piers. Total length of the bridge is about 640 feet. AWARDS - Design - Build of Americas Best Design, 1997 - Associated Builders and Contractors Award of Excellence - Tilt -Up Concrete Association Achievement Award Broward Countv Convention Center Pedestrian Bridee. Fort Lauderdale, Florida The enclosed pedestrian bridge is 125 ft long and connects the Convention Center to the 2500 - car Port Everglades Parking Facility All 11: CGC1519484 MS: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 5 of 66 FL: CMC1250004 NC:69344 O: 305.523.3656 1 F: 888.499.1748 1 LynxConstructionManagement.com RFQ# 13 -08 -01 TN: 63012 I r F F N 1 1 11 X CONSTRUCTION MANAGEMENT Broward Countv Judicial Complex, Fort Lauderdale, Florida Three connecting bridges ranging in length from 125 ft to 189 ft. One bridge is connects the 2300 -car garage and the East wing, and two other bridges connect new and existing judicial complex buildings over Downtown Fort Lauderdale thoroughfares Causewav Sauare. North Miami, Florida A 57 foot covered bridge connecting the garage to the office building AWARD — Developers & Builders Alliance — Best Florida Project of the year, Mixed -Use Category, 2010 Cvoress Creek Tri -Rail Station, Fort Lauderdale, Florida This two - platform station is the first of its kind in Florida, with its platforms joined by an overhead pedestrian bridge. It is designed to be the prototype for many more. Two 400 ft platforms and a 75 ft long pedestrian bridge connecting the platforms on each side of the track. AWARD - Miami Chapter American Institute of Architects - Award of Merit, 1996 FL: C13C1519414 FL: CMC1250004 TN: 63012 o fi MS: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 6 of 66 NC: 69344 O: 305.523.3656 1 F: 888.499.1748 1 LynxConstructionManagement.com RFQ# 13 -08 -01 �IO CONSTRUCTION MANAGEMENT Causewav Square. North Miami, Florida A 57 foot covered bridge connecting the garage to the office building AWARD — Developers & Builders Alliance — Best Florida Project of the year, Mixed -Use Category, 2010 Dale Earnhardt Memorial Bridee, Daytona Beach, Florida A single span Continental® pedestrian truss bridge, with a 209 foot long span and 20 feet in width David Lawrence Convention /Exposition Center, Pittsburgh, Pennsylvania 285 ft Glass- Enclosed Bridge Incorporated in Underside of Roof Space Frame FDOT — Tri -Rail Fort Lauderdale Train Station, Fort Lauderdale, Florida Renovation to historic building and canopy FL CGC1518484 MS: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 7 of 66 FL: CMC1250004 NC:69344 O: 305.523.3656 1 F: 888.499.1748 1 LynxConstructionManagement.com RFQN 13 -08 -01 TN: 63012 r � CONSTRUCTION NANAGENENT First Nationwide Bank. North Miami Beach, Florida 38 ft open bridge between parking garage and office building Indian Creek Bridees, Miami Beach, Florida Arched pedestrian bridge over Indian Creek rKendall Town & Country Specialty Center, Miami, Florida 225 ft bridge connecting ends of U- shaped retail facility, across man -made lake rMiami Gardens Sh000ine Mall. Miami Gardens, Florida Design -build of 70,000 sf shopping mall including 240 parking spaces r Naples Communitv Hospital. Naples, Florida Two bridges, 50 ft and 220 ft long, (50 ft bridge is two level), connecting parking garage to medical office building to main hospital Oriole Park at Camden Yards, Baltimore, Maryland 60 ft span open steel bridge connecting Stadium to Camden Warehouse Park 3 - 5 Connector, Miami International Airoort. Miami, Florida 66 ft bridge connecting two parking garages at fourth level, serving both vehicles and pedestrians FL: C13CI519494 M5: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 8 of 66 FL: CMC1250004 NC: 69344 O: 305.523.3656 I F: 888.499.1748 1 LynxConstructionManagement.com RFQ# 13 -08 -01 TN: 63012 ' L N X CONSTRUCTION MANAGEMENT Rosen Centre Skvwalk, Orlando, Florida Two Gateway® style, Continental® truss bridges, 158'x 10' in size, with concrete decks and a roof support system 1 h n 1 1 I 1 1 Rvder Bridge, Miami, Florida Swinging, cable- suspended bridge to a private island from a lokeshore residence Skvoort Miami International Airoort. Miami, Florida Two 35 ft precast bridges from the Skyport (elevated helicopter terminal) to the adjacent parking garages South Florida Tri- Rai IT" . Pompano Beach, Florida Ten bridges were installed along the commuter rail corridor that serves Broward, Palm and Dade counties. The Continental® overpass bridges vary in length from 35' to over 85' FL: CGC1519494 M5: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 9 of 66 FL: CMC1250004 NC:69344 0:305.523.3656 1 F: 888.499.1748 1 LynxConstructionManagement.com RFOff 13 -08 -01 TN: 63012 r� 1 1 t t toX CONSTRUCTION MANAGEMENT South Miami Hospital. South Miami, Florida 169 ft glass enclosed, two -level pedestrian bridge connecting the hospital to a medical office building rs 9 South Miami US -1 Pedestrian Bridee. South Miami, Florida Conceptual design for a pedestrian overpass linking the South Miami Metrorail Station with the City's vibrant downtown business district. It features, elevators, stairs, landscaping and architectural features L - vexes +- ff FL: CGC1518484 M5: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 10 of 66 FL: CMC1250004 NC:69344 0:305.523.3656 1 F: 888.499.1748 i LynxConstruction Management.com RFQ #13 -08 -01 TN: 63012 �x COMST! IOM MANAGEMENT SunBank Center, Fort Lauderdale, Florida Two open bridges, 82 ft and 30 ft, connecting an existing bank building to a new office building Surfside Parkine Lot. Surfside, Florida Design -build of parking lot area expansion and miscellaneous improvements 0 Tallahassee Memorial Hosoital, Tallahassee, Florida 153 foot long, 2 -story covered bridge to connect the new addition to the existing hospital FL: CGC1518484 M5: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 11 of 66 FL: CMC1250004 NC: 69344 O: 305.523.3656 1 F: 888.499.1748 1 LynxConstructionManagement.com RFQif 13-08 -01 TN: 63012 L �X `/CONSTRUCTION MANAGEMENT Terminal Wide Peoole Mover Svstem. Miami International Airport - Miami, Florida Covered bridges totaling over 3500 feet, connecting all passenger concourses and parking garages F Tallahassee Memorial Hosoital. Tallahassee, Florida 153 foot long, 2 -story covered bridge to connect the new addition to the existing hospital The Plaza St. Petersburg, Florida Bridge connecting office building and parking garage FL CGC1518484 M5: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 12 of 66 FL: CMC1250004 NC:69344 0:305.523.36561 F: 888.499.1748 1 LynxConstruction Management.com RFQ#13 -08 -01 TN: 63012 �x CONSTRUCTION NANAOENENT Village of Palmetto Bav Pedestrian Crossover Bridge. Palmetto Bay, Florida Village Hall Complex & 100 ft Pedestrian Crossover Bridge La J�t � Y per. Walt Disnev World - Eocot Center. Orlando, Florida Two bridges totaling 350 ft over lake to Odyssey restaurant from main pedestrian thoroughfare FL: CGC1518484 M5: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 13 of 66 FL: CMC1250004 NC:69344 O: 305.523.3656 1 F: 888.499.1748 1 LynxConstructionManagement.com RFQ# 13 -08 -01 TN: 63012 I 1 [J 1 n I L N x `!CONSTRUCTION MANAGEMENT 3. STAFFING Lynx's experience and that of its Principals, employees and affiliates covers the full range of municipal, infrastructure, institutional, commercial and residential projects. Lynx's President has over thirty years of construction experience with public and private projects including high - rise, civil, engineering works, and pedestrian bridges. We are committed to providing quality service to our clients and building long -term relationships. Our staff has extensive experience having managed to successful completion the construction and renovation of over 10,000 apartment units, banks, schools, colleges, single - family homes and public works. Our experience allows us to understand the needs of the Owner /Developer and provide successful projects. This has led to the completion of all of our projects on time, within budget, and with the highest of quality standards. ' Lynx's staff includes Architects and Engineers, LEED Accredited Professionals, Project Managers, Estimators, Environmental Scientists and Superintendents. We can provide any building related ' service through our in -house staff, affiliates and consultants. Our staff and affiliates hold current licenses and certifications in Engineering, asbestos, mold mitigation, Architecture, general contracting, mechanical contracting, LEED AP, Green Buildings, environmental science, ' geology, indoor air quality, cost consulting, scheduling and other pertinent areas. Our staff is expert at providing construction in public and private settings. The staff has headed public construction management projects and construction programs for local institutions exceeding $3 billion dollars and 600 projects. The staffs record of accomplishment of on time and within budget projects far exceeds industry standards. Project Core Team • Christopher Moran, PE — President • Brian Shirley — Senior Project Manager • George Skinger — Senior Estimator & Pre- construction Services • Thomas M. Carlson, LEED AP, RID —Design Principal • George N. Khoury, PE— Structural Engineer • Ernesto Aloma, PE — MEP Engineer • Jorge Hammal — Assistant Project Manager, QC & Compliance Officer • Anouk do Pico Sforza —Project Coordinator FL: CGC1518494 MS: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 14 of 66 FL: CMC3250004 NC:69344 O: 305.523.3656 1 F: 888.499.1748 1 LynxConstructionManagement.com RFQN 13 -08 -01 TN: 63012 L �X Co NSTRUCTION MANAGEMENT Project Organizational Chart Christopher Moran, PE President o_ f Lynx I Jorge , Quali y Con George /Suction Brian Shirley APM, Quality Control & Pre - construction Compliance Officer Senior Project Manager Services Estimator I _ I I Anouk do Pico I MC HARRY I Project Coordinator 1 Thomas M. Carlson, LEED AP, RID 1 Design Principal 11 BNI SDM George N. Khoury, PE Ernesto Aloma, PE Structural Engineer MEP Engineer Coordination of work Brian Shirley — Senior Project Manager FL: CGC1518484 MS: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 15 of 66 FL: CMC1250004 NC:69344 0:305.523.3656 1 F: 888.499.1748 1 LynxConstruction Management.com RFQ #13 -08 -01 TN: 63012 L N x CONSTRUCTION MANAGEMENT Christopher M. Moran, PE, LEED AP President • 35 years leadership experience in the Construction Industry • 7 years College -wide Chief Facilities Officer for Miami Dade College • 16 years at Miami -Dade Public Schools, Chief Operations Officer • Pioneered Construction Management process in several major institutions • Educational, Commercial facilities, multi - family, Industrial Facilities • Licensed Engineer • Certified General and Mechanical Contractor in multiple states • Design -Build experience • Provides oversight of the entire project process LICENSES and CERTIFICATIONS: Florida General Contractor CGC 1518484 Florida Building Contractor CBC 057437 Florida Mechanical Contractor CIVIC 1250004 Also licensed as General Contractor in NC, MS, TN Professional Engineer Florida PE 37327 Professional Engineer Alabama PE 30776 Professional Engineer Tennessee PE 113616 Professional Engineer Mississippi PE 19614 Professional Engineer North Carolina PE 69344 Professional Engineer Texas PE 105652 Professional Engineer Georgia PE 034843 Building Official BU1181 and Uniform Building Code Inspector, Florida Energy Auditor, TAA 88 Lead Hazard Assessor EPA certified LI -138 Lead Inspector EPA certified RA -137 Radon Mitigation Specialist R 1049 /Radon Measurement Technician R 1009 LEED AP i EXPERIENCE: ® President of Lynx Construction Management t Head of a multi -state General Contracting company performing renovation, remodeling, new construction projects. Responsible for all aspects of operational management, supervision of field project managers, subcontractors and workers including profit and loss. Chief Facilities Operations Officer, Licensed Contractor, Engineer and Building Official Miami -Dade County Public Schools Chief Operations Officer in charge of in -house and contracted construction, Construction Management, renovation and maintenance in approximately 40 million square feet of educational space at 400 sites. Served as General Contractor and Chief Engineer responsible for construction, maintenance and renovation FL: CGC1518484 MS: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 16 of 66 FL: CMC1250004 NC: 69344 O: 305.523.3656 I F: 888.499.1748 1 LynxConstructionManagement.com RFQ# 13 -08 -01 TN: 63012 L N X CONSTRUCTION MANAGEMENT work performed by over 1000 trades employees as well as outside contractors and sub contractors. Over B$100 million dollar annual capital budget. Vice Provost and Chief Facilities Officer, Licensed Contractor, Engineer and Building Official Miami Dade College Chief Operations Officer for all Field Operations and construction. In charge of Project Management, Design, ' construction, Real Estate Development, Planning, Environmental Health and Safety. Served as General Contractor and Chief Engineer. Over 100 million Dollar annual capital budget. Director of Construction, Miami -Dade County Public Schools Responsible for Project Field operations and contracting and subcontracting. Construction Management and Design - Build. Director of Facilities Design and Quality Control, Miami -Dade County Public Schools Supervise in -house architectural, engineering, design -build and inspection functions. Manage the technical quality control of the new construction program, capital renewal, and portable classroom building and maintenance programs. The $2.6 billion capital program consisted of more than 600 projects. Develop and 1 maintain the school district's design criteria, CAD standards and master specifications. Over 200 million dollar annual capital budget. Coordinator of Engineering, Miami -Dade County Public Schools District Engineer responsible for developing policies, standards, and mechanical and building system design criteria for the $2.6 billion capital program. Provide technical support to safety, energy management, and maintenance and construction forces. Over 200 million dollar annual capital budget Manager of Energy and Security Systems, Miami -Dade County Public Schools Manage, maintain, and monitor building control, fire, burglar alarm and access systems at 300 separate sites comprising the nation's 4"' largest school district. Develop design standards for energy conservation and building automation systems. Perform analysis of energy conservation building retrofit strategies. Select and manage consultants and contractors on energy conservation projects. Prepare district utility budget, 1 negotiate with utility companies, act as liaison with governmental agencies, develop educational programs. 1 EDUCATION: M. E. 1981, Master of Engineering, University of Florida B. S.M.E. 1978, Bachelor of Science Mechanical Engineering, University of Miami PROFESSIONAL ACTIVITIES: USGBC United States Green Building Council ASCE American Society of Civil Engineers ASIS American Society of Industrial Security IFMA International Facility Management Association APPA Association of Higher Education Facilities Managers Miami Chamber of Commerce FL: CGC1519484 M5: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 17 of 66 FL: CMC1250004 NC: 69344 O: 305.523.3656 ( F: 888.499.1748 1 LynxConstructionManagement.com RFQtt 13 -08 -01 TN: 63012 I 1 k u H L 1 L N X CONSTRUCTION MANAGEMENT Brian S. Shirley Senior Project Manager • 15 years in the Construction Industry • Experience in Commercial and Educational facilities including the FOOT Maintenance and Repairs Facility, FOOT Train Station, Miami Beach Wolfsonian Museum, and Riviera Nursing Home • Construction Management and Design -Build Experience • Will manage overall construction process • Ultimately responsible for keeping the project on schedule and within budget :[1411Za,1114 Lynx Construction Management, LLC — Coral Gables, FL. Senior Project Manager • Managed all phases of construction for multiple projects • Approve all Payment Applications prior to submission to Architect, Owner, and Accounting Department. • Cost Control. • Evaluate and approve all Change Orders prior to submission to Architect, Owner, and Accounting. • Review and approve all Subcontractor Payment Requests /Applications prior to submission with Accounting. • Supervise all awards of Subcontracts and Materials DooleyMack Constructors - Miami, FL. Senior Project Manager • Managed all phases of construction for multiple projects with AIMCO and mid -rise skilled nursing home /rehabilitation center (HUD, AHCA), and school boards. • Established and managed Miami office of DooleyMack. Project Manager Managed start-up accounts with various projects for Florida International College, Miami Dade College. Estimated all work for school board projects. Managed all construction phases for Surgery Center and Expansion to existing nursing home (AHCA). Preconstruction work for Historic Coral Gables Museum ( prepared bid packages, restoration research, prepared estimates, budgeting, and bid openings for public financed project) T &G Constructors — Miami, FL. Project Manager • Managed all phases of construction on multiple school projects. • Managed all phases of construction on award winning School & Church project. FL: CGC1118494 M5: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 18 of 66 FL: CMC1250004 NC:69344 0:305.523.36561 F: 888.499.17481 LynxConstruction Management.com RFQ#13-08 -01 TN: 63012 ' L N X CONSTRUCTION �J MANAGEMENT GS2 Corporation /Sieger Suarez Architecture — Miami, FL. Project Engineer • High Rise Trump International Group project. Installations, close out of permitting & inspections, and punch -out of building with Owners. Responsible for interior FF &E coordination. 1 U 1 C L' i I Superintendent • 7 story mid -rise, 5 story mid -rise, Yacht Club, and multiple story 30 -40 -50 high -rise building. • Responsible for layout verifications, safety meetings and coordination with OSHA, general carpentry, buck hoist coordination, piling and shaft layouts, meeting minutes, submittals, shop drawings, field pile cap logs, threshold inspection logs, managed all city inspections. EDUCATION Florida International University — August 2008 Masters of Science in Construction Management — Honors 3.75 University of Florida — December 1998 Bachelor of Arts in Business Administration /Minor in Building Construction ACHIEVEMENTS • DooleyMack Team Member of the Year 2007 • ABC Excellence in Construction award /Eagle Award — 2006 • T &G Constructors Project Manager of the Year 2004 award ADDITIONAL QUALIFICATIONS • Florida General Contractors License #CGC 062058. • Certified OSHA 14hr. construction safety course. • Proficient in Excel, Word, PowerPoint, Primavera P6, SureTrack, Microsoft Projects, COINS, and Prolog (PMS). FL: CGC1518484 M5: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 19 of 66 FL: CMC1250004 NC:69344 O: 305.523.3656 1 F: 888.499.1748 1 LynxConstructionManagement.com RFQ# 13 -08 -01 TN: 63012 L IN x -/ CONSTRUCTION MANAGEMENT George W. Skinger Preconstruction Services / Estimator • 30 years of experience in the Construction Industry • Construction Management and Design -Build Experience Pre- Construction and Estimating of the project; will be responsible for organizing bids, preparing conceptual /detailed budget estimates, value engineering ideas, and scheduling I have been engaged in the construction industry for 30 years, successfully overseeing all phases of multimillion dollar new construction, renovations, and environmental projects for government and private -sector clients. My experience includes, working with clients to develop budgets, working schedules, estimating and buying -out the project. I fully negotiate and prepared written contracts to all sub - contractors. Organizing and planning the weekly OAC (owner, architect & contractors) meetings keeps me in complete control of the projects. In the past I have coordinated safety training and planning of the asbestos /lead awareness to the subcontractor's staff for several projects. By supervising the assistant project managers, clerk of the work, and project superintendents during construction I have developed an effective control of the job schedule and the quality of the scope of work. I continuously close -out all projects on time, and on budget, meeting the highest quality standards. KEY SKILLS — Commercial Construction /Demolition — Site Safety /OSHA Compliance — Budgeting & Cost Controls — Site Work Improvement Engineering — QA /QC /Field Engineering —Bidding/Estimating/Proposals — Certified Payroll Documentation —Change Order Management — Scheduling /CPM /Resources — Computer Programs (Office 2010,surtrack, expedition, pro estimator, etc. ) — MSDS/ASTM/ASTRE — ADA Requirements and Compliance — Asbestos /Lead Remediation — Contamination Remediation — LEED Green Associate Training 1 EMPLOYER SUMMARY LYNX CONSTRUCTION MANAGEMENT, LLC (Coral Gables, FL) — Estimator Provide Pre - Construction services including but not limited to complete estimates and scheduling for majority of bids the company provides proposals for. CONSULTANT, SMALL BUSINESS OWNER (Miami, FL) — Indenendent Consultant Provide estimating and project management services. MAX SOUTH CONSTRUCTION INC (N. Miami, FL) — Senior Proiect Manager /Estimator Provided completed estimates for majority of bids the company provided proposals for (won or lost). Served as Owners Representative to several clients, reviewed all contract documents and payment requisitions through completion of project. Processed and developed all documents required for state and local agencies, including building & /or fire department approval. Supervised & managed numerous new construction projects from $500K to $15M. Provided project leads and jobs through business & personal contacts from my network of associates. Served as Safety & Health Officer on larger projects & assisted when OSHA inspections happened. I was in direct privy to the owner(CEO) in most of the major events of company operations for the past 10 years. 11: CGC15184U M5: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 20 of 66 FL CMC1250004 NC:69344 O: 305.523.3656 I F: 888.499.1748 1 LynxConstructionManagement.com RFQ# 13 -08 -01 TN: 63012 L N X CONSTRUCTION �! MANAGEMENT B & B CONTRACTORS /BERGMAN BROS (Chino, CA) — Travelina Proiect Manaaer /Estimator Serviced several national based clients, traveling the United States, performing a complete turn -key management plan for several projects at a time. I was also, called upon to step in on projects that others had started that needed to be straighten out or completed. Estimated projects for bidding and execution. I was in direct contact with the owner (CEO) & moving towards being a VP with projects from $SOOK to $4M. GENERAL CONTRACTOR, SMALL BUSINESS OWNER (Miami, FL) — General Contractor Used my license to perform many small projects before and after Hurricane Andrew. Served as qualifying agent for other companies with my license. Started development of real estate properties for profit! ' COMPANIES OF R & S (Miami, FL) — Sales /Suaervision /Estimator Severed as chief estimator and sales of construction projects to include windows & doors (Anderson, Pella, PGT, Yale). Completed remolding of residential retrofits, commercial projects (restaurants, and commercial offices). Developed computer estimating system for company use during my tenure. Served as the company alternate member on business associations ( SFBA, ASGC, Executive Club of Miami). IJ 1 F II 0 1 1 II EDUCATION AND CERTIFICATIONS • MIAMI DADE COLLEGE (Miami, Fla.) — Buildina Construction Technoloay.. 1981 • State of Florida, General Contractors License, 1982 • Dale Carriage graduate and training assistant 1985 • OSHA 30 Certification 2009, working on OSHA 500 • OEM training for Asbestos / Lead awareness Certification 2009 • Also Certified in Construction Safety, Confined Space Entry and First Aid /CPR 2007 FL CGC1518484 M5: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 21 of 66 FL: CMC1250004 NC:69344 0:305.523.3656 1 F: 888.499.1748 1 LynxConstructionManagement.com RFQ #13 -08 -01 TN: 63012 I 1 1 1 1 R I 1 1 1 1 1 �X CONSTRUCTION MANAGEMENT Thomas M. Carlson, LEED AP, RID M.C. Harry & Associates, Inc., Design Principal LICENSES and CERTIFICATIONS: 1977 -Architecture Florida (#7420) NCARB Certified 2004 - LEED Accredited Professional As the design principal of the firm, Mr. Carlson is responsible for developing project specific conceptual design, managing their development through each project phase. Mr. Carlson is a hands -on architect who promotes spirited team collaboration to ensure that the very best ideas are considered and presented to the client. He is an effective team leader and motivator, whose focus is on well- managed, quality design projects delivered on time and within budget. Mr. Carlson has over 35 years of professional experience in the planning, programming and design of numerous facilities for municipalities, government agencies and public institutions. RELEVANT EXPERIENCE: Miami International Airport, Terminal Wide People Mover System Design Principal The Terminal Wide People Mover System (TWPMS) connects the Flamingo and Dolphin Parking Garage System with Miami International Airport's north, central, and south terminals and their light rail link to the Miami Intermodal Center (MIC). The system is comprised of a series of major and minor bridge elements spanning over a variety of landside roadways. The bridges are typically enclosed and air conditioned. The 110' long span bridges include moving sidewalks to facilitate efficient pedestrian movement. Integral with this passenger conveyance system are several vertical circulation cores within the terminal. These core circulation elements enhance passenger movement to baggage claim areas on terminal level one, ticketing on terminal level 2, and the terminal level three TWPMS. City of South Miami, US -1 Pedestrian Bridge Design Principal The City of South Miami commissioned MC Harry Associates to develop a conceptual design for a pedestrian overpass linking the South Miami Metrorail Station with the City's vibrant downtown business district. The pedestrian bridge would improve safety by eliminating the need for Metrorail passengers to cross US -1 at street level. The Overpass features elevators, stairs, landscaping and architectural features that create a gateway to the South Miami Community. Village of Palmetto Bay Design Principal The Village of Palmetto Bay hired M.C. Harry & Associates to develop a conceptual design for a new 10,000sf Village Hall Complex located on a 2.4 acre site. A key element in the Village's civic center master plan is the development of a three story 500 car parking garage with ground floor retail leasehold. The civic center and retail /garage environment will be linked to adjacent public parkland via a pedestrian bridge spanning 100 feet over Frango Boulevard. The bridge is intended to also serve as an iconic entry feature enhancing the identity of this newly incorporated municipality. IXfl�i7tl11�L`I Iowa State University— 1973 Bachelor of Science in Architecture FL: CGC1519484 MS: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 22 of 66 FL: CMC1250004 NC:69344 O: 305.523.36561 F: 888.499.17481 LynxConstruction Management.com RFQ#13 -08 -01 TN: 63012 Mr. Arrington has more than 30 years of professional experience in architecture, landscape design, and facilities planning. Project experience includes numerous building types for a variety of governmental, institutional, and commercial clients. Mr. Arrington's special expertise in program and code analysis, 1 combined with his design talents and detailed knowledge of construction make him a most effective quality control oriented manager with an established track record for delivering award winning projects on -time and within budget. Mr. Arrington has also conducted several value analysis workshops on large scale public sector projects which have resulted in significant savings to the client in both initial construction costs and subsequent life cycle costs. k 1 h RELEVANT EXPERIENCE: Terminal Wide People Mover System: A dedicated pedestrian circulation system and related improvements being constructed in nine phases over a period of approximately ten years. This project, when completed, will link pedestrian circulation throughout the Terminal building, the Concourses, and the Parking Garages, utilizing new elevators, escalators and over three miles of moving sidewalks. MIC MIA Station Complex: Project involvement began by producing original planning concepts and graphic exhibits for MDAD to assist in the effort of funding. The current design responsibilities include: 1. Modifications to MIC Station design to accommodate heavy rail technology. 2. Modifications to Parking Garage No. 6 to accommodate guide way alignment. 3. Guide way design interface with CCP. Ground Transportation Improvements Project - This collection of 10 separate projects will assist M.I.A.'s landside environment to meet access demand through year 2015. Project elements include: new upper drive approach road and ramp; upper & lower drive widening; upper drive courtesy vehicle stops; a new 1,500 car parking garage; 16 lane central revenue collection plaza; 2 -level 16 vehicle central bus station serving 3.5 million airport/seaport passenger movements. $175,000,000 EDUCATION Florida International University, Miami, FL Post Graduate Studies —1990 Construction Management University of Florida, Gainesville, FL Master of Arts in Architecture —1978 FL: CGC15194M M5: 18124 -MC 45 Almeria Avenue 1 Coral Gables, Florida 33134 Page 23 of 66 FL: CMC1250004 NC:69344 0:305.523.36561 F: 888.499.1748 1 LynxConstructionManagement.com RFQ #13 -08 -01 TN: 63012 LICENSES and CERTIFICATIONS: L �x [ONSTRUCTION J MANAGEMENT Lawrence Arrington, AIA, LEED AP M. C. Harry & Associates, Inc., Senior Architect Mr. Arrington has more than 30 years of professional experience in architecture, landscape design, and facilities planning. Project experience includes numerous building types for a variety of governmental, institutional, and commercial clients. Mr. Arrington's special expertise in program and code analysis, 1 combined with his design talents and detailed knowledge of construction make him a most effective quality control oriented manager with an established track record for delivering award winning projects on -time and within budget. Mr. Arrington has also conducted several value analysis workshops on large scale public sector projects which have resulted in significant savings to the client in both initial construction costs and subsequent life cycle costs. k 1 h RELEVANT EXPERIENCE: Terminal Wide People Mover System: A dedicated pedestrian circulation system and related improvements being constructed in nine phases over a period of approximately ten years. This project, when completed, will link pedestrian circulation throughout the Terminal building, the Concourses, and the Parking Garages, utilizing new elevators, escalators and over three miles of moving sidewalks. MIC MIA Station Complex: Project involvement began by producing original planning concepts and graphic exhibits for MDAD to assist in the effort of funding. The current design responsibilities include: 1. Modifications to MIC Station design to accommodate heavy rail technology. 2. Modifications to Parking Garage No. 6 to accommodate guide way alignment. 3. Guide way design interface with CCP. Ground Transportation Improvements Project - This collection of 10 separate projects will assist M.I.A.'s landside environment to meet access demand through year 2015. Project elements include: new upper drive approach road and ramp; upper & lower drive widening; upper drive courtesy vehicle stops; a new 1,500 car parking garage; 16 lane central revenue collection plaza; 2 -level 16 vehicle central bus station serving 3.5 million airport/seaport passenger movements. $175,000,000 EDUCATION Florida International University, Miami, FL Post Graduate Studies —1990 Construction Management University of Florida, Gainesville, FL Master of Arts in Architecture —1978 FL: CGC15194M M5: 18124 -MC 45 Almeria Avenue 1 Coral Gables, Florida 33134 Page 23 of 66 FL: CMC1250004 NC:69344 0:305.523.36561 F: 888.499.1748 1 LynxConstructionManagement.com RFQ #13 -08 -01 TN: 63012 LICENSES and CERTIFICATIONS: Florida Registered Architect #8516 Georgia Registered Architect #5317 NCARB Certified #25916 LEED AP Mr. Arrington has more than 30 years of professional experience in architecture, landscape design, and facilities planning. Project experience includes numerous building types for a variety of governmental, institutional, and commercial clients. Mr. Arrington's special expertise in program and code analysis, 1 combined with his design talents and detailed knowledge of construction make him a most effective quality control oriented manager with an established track record for delivering award winning projects on -time and within budget. Mr. Arrington has also conducted several value analysis workshops on large scale public sector projects which have resulted in significant savings to the client in both initial construction costs and subsequent life cycle costs. k 1 h RELEVANT EXPERIENCE: Terminal Wide People Mover System: A dedicated pedestrian circulation system and related improvements being constructed in nine phases over a period of approximately ten years. This project, when completed, will link pedestrian circulation throughout the Terminal building, the Concourses, and the Parking Garages, utilizing new elevators, escalators and over three miles of moving sidewalks. MIC MIA Station Complex: Project involvement began by producing original planning concepts and graphic exhibits for MDAD to assist in the effort of funding. The current design responsibilities include: 1. Modifications to MIC Station design to accommodate heavy rail technology. 2. Modifications to Parking Garage No. 6 to accommodate guide way alignment. 3. Guide way design interface with CCP. Ground Transportation Improvements Project - This collection of 10 separate projects will assist M.I.A.'s landside environment to meet access demand through year 2015. Project elements include: new upper drive approach road and ramp; upper & lower drive widening; upper drive courtesy vehicle stops; a new 1,500 car parking garage; 16 lane central revenue collection plaza; 2 -level 16 vehicle central bus station serving 3.5 million airport/seaport passenger movements. $175,000,000 EDUCATION Florida International University, Miami, FL Post Graduate Studies —1990 Construction Management University of Florida, Gainesville, FL Master of Arts in Architecture —1978 FL: CGC15194M M5: 18124 -MC 45 Almeria Avenue 1 Coral Gables, Florida 33134 Page 23 of 66 FL: CMC1250004 NC:69344 0:305.523.36561 F: 888.499.1748 1 LynxConstructionManagement.com RFQ #13 -08 -01 TN: 63012 L N X CONSTRUCTION MANAGEMENT James W. Piersol, AIA, LEED AP, C.C.S. ' M.C. Harry & Associates, Inc. Principal -in- Charge LICENSES and CERTIFICATIONS: 1979 - Architecture Florida ( #8079) Certified Construction Specifier 2009 - LEED Accredited Professional Mr. Piersol has over 30 years of experience in the planning, design and construction of major public buildings, including aviation and transportation related facilities, banks, restaurants and renovations and historic restorations. Mr. Piersol has also been responsible for numerous studies, consultation reports, construction cost estimates and specifications. Mr. Piersol has served public agencies throughout South Florida including City of Miami Beach, City of Miami, City of South Miami, City of Coral Gables, City of Hollywood, Broward County Public Works, Dade County G.S.A., the Miami International Airport, the 11th District Circuit Courts, United States Information Agency and Key West Naval Air Station. RELEVANT EXPERIENCE: Village of Palmetto Bay Principal -in- Charge The Village of Palmetto Bay hired M.C. Harry & Associates to develop a conceptual design for a new 10,000sf Village Hall Complex located on a 2.4 acre site. The Village envisions a civic center with distinct character that will serve as the anchor for future development and redevelopment in their emerging downtown central business district. The project will incorporate elements that encourage pedestrian activity, allows for efficient land utilization, facilitates both pedestrian and vehicular circulation. Miami International Airport, Terminal Wide People Mover System Principal -in- Charge ' The Terminal Wide People Mover System (TWPMS) connects the Flamingo and Dolphin Parking Garage System with Miami International Airport's north, central, and south terminals and their light rail link to the Miami Intermodal Center (MIC). The system is comprised of a series of major and minor bridge elements spanning over a variety of landside roadways. The bridges are typically enclosed and air conditioned. The 110' long span bridges include moving sidewalks to facilitate efficient pedestrian movement. Integral with this passenger conveyance system are several vertical circulation cores within the terminal. These core circulation elements enhance passenger movement to baggage claim areas on terminal level one, ticketing on terminal level 2, and the terminal level three TWPMS. City of South Miami, US -1 Pedestrian Bridge Principal -in- Charge The City of South Miami commissioned MC Harry Associates to develop a conceptual design for a pedestrian overpass linking the South Miami Metrorail Station with the City's vibrant downtown business district. The pedestrian bridge would improve safety by eliminating the need for Metrorail passengers to cross US -1 at street level. The Overpass features elevators, stairs, landscaping and architectural features that create a gateway to the South Miami Community. EDUCATION University of Florida — 1977 Master of Arts in Architecture FL: CGC1518484 Ms: 18124 -MC 45 Almeria Avenue i Coral Gables, Florida 33134 Page 24 of 66 FL: CMC1250004 NC:69344 0: 305.523.3656 i F: 888.499.1748 i LynxConstructionManagement.com RFQ# 13 -08 -01 TN: 63012 L AG X -/CONSTRUCTION MANAGEMENT George N. Khoury, PE BNI, Structural Engineer George Khoury's career includes the design of a variety of structural systems for a broad range of project types, ranging from parking garages, residential, educational facilities, healthcare, and sports facilities. His diversified experience in structural engineering analysis, design and ' management combined with his passion for excellence and teaching make him perfectly suited for the role as engineering director. George started his career as a structural engineer for a major precast pre- stressed company working closely with structural engineers and contractors. During his tenure there, he gained a good understanding of constructability and value engineering, and a great respect for those managing and performing the construction process. 1 George represents the firm throughout the life of a project, starting from the conceptual design stage through construction administration. His design experience includes cast -in -place concrete, composite precast concrete, post- tensioned concrete, light gage steel, wood, and structural steel tsystems. Relevant Projects (Pedestrian Bridges & Parking) Centre City Mall, Chaguanas, Trinidad W.I. • New 780,000 -SF multi -story mall and 5 -story 429 car parking garage located in a highly seismic area. • Provided creative and architecturally appealing solution for 120 -ft span mall- bridge over an existing road. • Principal In Charge Causeway Square Garage, North Miami, Florida t• 3 levels; 260 -car garage. • The garage is connected to an office building with a 57 feet covered bridge. • Principal in Charge, Engineer of Record Tallahassee Memorial Hospital, Tallahassee, Florida t• 653,000 -SF expansion to Florida's eighth largest hospital • 153 -foot long, 2 -story covered bridge to connect the new addition to the existing hospital. • Engineer of Record, Project Manager Capping Bridge at the Gate District Towers, Abu Dhabi, UAE • 1,400 -ft. long capping bridge on top of three 63 -story residential towers. • The bridge is approximately 41 -ft deep and 99 -ft. wide, with Individual spans of up to 220 feet, and cantilevers 130 -ft beyond the last tower. • The capping bridge houses two levels of luxury penthouses and garden spaces. FL: CGC1518484 M5: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 25 of 66 FL: CMC1250004 NC:69344 O: 305.523.3656 I F: 888.499.1748 1 LynxConstructionManagement.com RFQ# 13 -08 -01 TN: 63012 u Mn ONSTRUCTION MANAGEMENT • Principal In Charge, Project Manager Florida State University Parking Garage No. 2, Tallahassee, Florida • The 850 car parking structure has 4 -level of parking at the perimeter and 3 -level of scissors ramps parking at the middle section of the building. • Engineer of Record, Project Manager Florida State University Parking Garage No. 3, Tallahassee, Florida (Design - Build) • The design of this 1,500 car parking garage consists of six, 62 -feet bays, and has 4- levels of parking at the perimeter and at the middle two bays of the building, and 3- levels of parking at the interior scissors ramps. The garage has two -way traffic on each floor and vehicular access at two different levels. • Principal in Charge City of Hialeah Parking Garage, Hialeah, Florida • 5 levels; 365 cars • Engineer of Record, Project Manager Miami Free Zone Parking, Miami, Florida • 5 levels of parking for 1,550 cars below 4 levels, 90,000 -SF office building • Incorporating of an existing pedestrian bridge running through the new building. • Principal in Charge, Engineer of Record, Project Manager Oceanside Plaza Garage, Pompano Beach, Florida • Three -level parking structure for 500 cars topped with a landscaped pool deck, with retail on the ground level. • Project Engineer The George Garage, Coral Gables, Florida • 4 -story parking garage with a recreation deck on top. • Primary structural frame consists of composite precast concrete system. • Engineer of Record, Project Manager Education Bachelor of Science in Civil Engineering' University of South Florida May 1994 Major: Structural Engineering FL: CGC1518494 M5: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 26 of 66 FL: CMC1250004 NC: 69344 O: 305.523.3656 1 F: 888.499.1748 1 LynxConstructionManagement.com RFQ# 13 -08 -01 TN: 63012 tCONSTRUCTION MANAGEMENT Paul A. Zilio, PE BNI, Civil Engineer Paul worked in a variety of roles for a major general contractor and became a Certified General Contractor prior to joining BNI. Since joining BNI, Paul has worked on a number of design -build projects and often served as Threshold Inspector. These experiences have given Paul a unique insight into partnering and the value of good and timely communication and have helped lead BNI to recommendations by a number of contractors. Paul has designed a variety of structural systems, including cast -in -place concrete, composite precast concrete, tilt -up concrete, and structural steel. He works closely with designers and builders, regardless of delivery method, to make structural decisions that balance aesthetics, constructability, cost and schedule. Relevant Projects (Terminal Wide People Mover System) Skyride at Miami International Airport, Miami, Florida • Elevated covered pedestrian bridges totaling 3500 feet, connecting all passenger concourses and parking garages. • Threshold Inspector Representative Tri -Rail Station, Pompano Beach, Florida • This major upgrade to the Pompano Beach Tri -Rail Station includes two 25' x 400' platforms on grade with canopies for the northbound and southbound stations, with stairs and elevators, and a pedestrian overpass /overhead walkway. • Principal In Charge, Engineer of Record, Project Manager Broward County Judicial Complex, Fort Lauderdale, Florida • Two Six -Story, 349,000 -SF Office and Courtroom Wings • Three Pedestrian Bridges designed with structural steel spanning 125 -ft to 189 -ft • Project Engineer Westland Hialeah High School, Hialeah, Florida (Design - Build) • New 1694 - student high school, 322,084 -SF consisting of four buildings. • Principal in Charge, Engineer of Record Jorge Mas Canosa Middle School, Miami, Florida (Design - Build) 1 • 2232- student station middle school. • Principal -in- charge, Engineer of Record, Project Manager Norma Butler Miller Elementary, Miami, Florida (Design - Build) • 1068 - student elementary school. B• Principal -in- charge, Engineer of Record, Project Manager B FL: CGC1519494 MS: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 27 of 66 FL: CMC1250004 NC:69344 0: 305.523.3656 1 F: 888.499.1748 1 LynxConstructionManagement.com RFQ# 13 -08 -01 TN: 63012 1 L N X CONSTRUCTION MANAGEMENT Sunny Isles Beach Community School, Sunny Isles Beach, Florida • 1642 - student station, 145,000 -SF K though 8 center • Principal in Charge, Engineer of Record, Threshold Inspector 1 Country Club Middle School, Miami, Florida (Design - Build) • 1662- student station middle school with hurricane shelter. • Principal in Charge, Engineer of Record, Project Manager Doral Middle School, Doral, Florida (Design - Build) • 1300 - student station middle school with hurricane shelter designed with +40 mph above code required wind speed. • Engineer of Record, Project Manager, Project Engineer Jose de Diego Middle School, Miami, Florida (Design - Build) • 1310 - student station middle school. • Engineer of Record, Project Manager, Project Engineer Miami Coral Park High School Addition, Miami, Florida (Design - Build) • 1700- student station addition with hurricane shelter designed for 186 mph. • Principal in Charge, Engineer of Record, Project Manager Key Biscayne Education Center, Key Biscayne, Florida (Design - Build) • 80,000 -51' Middle School Classroom and parking addition. • Principal in Charge, Engineer of Record, Project Manager Bob Graham Education Center, Miami Lakes, Florida (Design - Build) • New middle school with hurricane shelter. • Design Criteria Professional, Special Inspector North County Government Center, West Palm Beach, Florida (Design - Build) • 72,000 -SF Addition and 32,000 -SF Renovation of an existing 2 -story courthouse building • Engineer of Record, Project Manager Education Bachelor of Science in Civil Engineering University of Michigan April 1981 Major: Civil Engineering FL: CGC1518484 M5: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 28 of 66 FL CMC1250004 NC:69344 O: 305.523.3656 1 F: 888.499.1748 1 LynxConstructionManagement.com RFQN 13 -08 -01 TN: 63012 N X -/CONSTRUCTION MANAGEMENT Ernesto Aloma, PE SDM, Electrical Engineer • 22 years of experience in Electrical Engineering • Licensed Professional Engineer • Principal in charge of the Firm's design decisions Licenses and Certifications State of Florida Professional Engineer PE 53823 Experience Vice President of SDM Consulting Engineers, Inc. Principal in charge of the Firm's design decisions. Responsible for ensuring the utmost level of quality for the various design components of all projects. Education BSEE 1991, Bachelor of Science in Electrical Engineering, Florida International University Professional Organizations IEEE Institute of Electrical & Electronic Engineers NSPE National Society of Professional Engineers Relevant Experience MIC Earlington Heights Connector Mr. Aloma was the Project Manager for the M /E /P design of this project involving a connector between the Miami Intermodal Center (MIC) and the Earlington Heights Metrorail Station (EHT) for the improvement of the existing transportation system by providing a transit connection to Miami International Airport. MIA Regional Commuter Facility Mr. Aloma was the Project Manager for the M /E /P /FP design of this 68,000 square foot commuter facility for American Airlines at Miami International Airport. The scope of work involves a new 3- story addition, contiguous with and extending the existing North Terminal Concourse. This work will include a new covered walkway to extend from the concourse to access small commuter planes. MIA Automated People Mover (APM) Maintenance and Storage Facility Mr. Aloma was the Engineer responsible for overseeing all aspects of the M /E /P /FP design of this APM maintenance and storage facility and main control room for said train system. This project includes the interior finish -out of approximately 87,000 sf of shell space and housing for the operation, maintenance, and service systems associated with APM vehicles, passenger stations and interface systems in general. FL: CGC1518484 M5: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 29 of 66 FL: CMC1250004 NC: 69344 O: 305.523.3656 1 F: 888.499.1748 1 LynxConstructionManagement.com RFQ# 13 -08 -01 TN: 63012 k II [I I I 11 I LJ I 1 1 I u Mn ONSTRUCTION MANAGEMENT Miami -Dade County Parks & Recreation - Miami Southridge Stadium Mr. Aloma was one of the Electrical Engineers for the M /E /P /FP Engineering Design and Construction Administration Services of this project which includes a 1,500 seat stadium facility consisting of a concession stand, restrooms, pedestrian access and circulation, ticketing and admissions area, and full handicap accessibility to the entire complex. City of Miramar - Vizcaya Park Community Center (LEED) Mr. Aloma was one of the Electrical Engineers for this 7,660 gsf single story Community Center building. This facility will include spaces for recreation, computer education /activity, gaming, park concessions, an office, and other support functions. City of South Miami - Murray Park Multipurpose Center, Phase 2 Mr. Aloma participated in the Electrical Engineering design on this project involving a two -story building of approximately 23,000 gsf which will house a multi - purpose program comprised of a gymnasium, office /classroom space, toilet rooms and support space, a parking lot, pedestrian walkways and related water, fire and sewer site utilities. Town of Miami Lakes — Royal Oaks Park Community Center (Certified GOLD Rated LEED Project) Mr. Aloma participated in the Electrical Engineering design of this project involving single -story building of approximately 8,200 gsf Design -Build Municipal Community Center. FL: CGC1119494 Ms: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 30 of 66 FL: CMC1250004 NC:69344 0: 305.523.3656 1 F: 888.499.1748 1 LynxConstructionManagement.com RFQ# 13 -08 -01 TN: 63012 k h L �X -� CONSTRUCTION MANAGEMENT Manuel P. Montoya, P.E. SDM, Electrical Engineer • 27 years of experience in Electrical Engineering • Licensed Professional Electrical Engineer • Principal in charge of the Firm's managerial decisions Licenses and Certifications State of Florida Professional Engineer PE 66220 Experience President of SDM Consulting Engineers, Inc. Mr. Montoya is the Principal responsible for ensuring that all individual design departments have the necessary resources for the timely completion of project tasks. Education BSEE 1989, Bachelor of Science in Electrical Engineering, Florida International University Professional Organizations IAEI (International Association of Electrical Inspectors) SAVE International Relevant Experience MIC Earlington Heights Connector Mr. Montoya participated in the Electrical Engineering design of this project involving a connector between the Miami Intermodal Center (MIC) and the Earlington Heights Metrorail Station (EHT) for the improvement of the existing transportation system by providing a transit connection to Miami International Airport. MIA Regional Commuter Facility Mr. Montoya worked on the Electrical design of this 68,000 square foot commuter facility for American Airlines at Miami International Airport. The scope of work involves a new 3 -story addition, contiguous with and extending the existing North Terminal Concourse. This work will include a new covered walkway to extend from the concourse to access small commuter planes. MIA Automated People Mover (APM) Maintenance and Storage Facility Mr. Montoya was one of the Electrical Engineers responsible for the Electrical Engineering design of this APM maintenance and storage facility and main control room for said train system. This project includes the interior finish -out of approximately 87,000 sf of shell space and housing for the operation, maintenance, and service systems associated with APM vehicles, passenger stations and interface systems in general. FL: CGC1518494 M5: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 31 of 66 FL: CMC1250004 NC:69344 0:305.523.36561 F: 888.499.17481 LynxConstruction Management.com RFQ #13 -08 -01 TN: 63012 F 1 �" N X -/CONSTRUCTION MANAGEMENT Miami -Dade County Parks & Recreation - Miami Southridge Stadium Mr. Montoya was the Principal -in- Charge for the M /E /P /FP Engineering Design and Construction Administration Services of this project which includes a 1,500 seat stadium facility consisting of a concession stand, restrooms, pedestrian access and circulation, ticketing and admissions area, and full handicap accessibility to the entire complex. City of Miramar - Vizcaya Park Community Center (LEED) Mr. Montoya is the M /E.Engineering Project Manager for this 7,660 gsf single story Community Center building. This facility will include spaces for recreation, computer education /activity, gaming, park concessions, an office, and other support functions. City of South Miami - Murray Park Multipurpose Center, Phase 2 Mr. Montoya was the M /E /P Engineering Project Manager in charge of this project involving a two - story building of approximately 23,000 gsf which will house a multi - purpose program comprised of a gymnasium, office /classroom space, toilet rooms and support space, a parking lot, pedestrian walkways and related water, fire and sewer site utilities. Town of Miami Lakes — Royal Oaks Park Community Center (Certified GOLD Rated LEED Project) Mr. Montoya is the M/E Engineering Principal -in- Charge responsible for overseeing the Mechanical and Electrical Engineering Design and Construction Administration Services for this single -story building of approximately 8,200 gsf Design -Build Municipal Community Center. FL: CGC1518494 M5: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 32 of 66 FL: CMC1250004 NC:69344 0: 305.523.3656 1 F: 888.499.1748 1 LynxConstructionManagement.com RFQ# 13 -08 -01 TN: 63012 L ON�AG X CSTRUCTION oo MANAGEMENT Jose I. Martinez, P.E., LEED AP SDM, Mechanical Engineer • 19 years of experience in Mechanical Engineering • Licensed Professional Mechanical Engineer Licenses and Certifications State of Florida Professional Engineer PE 53779 Experience Principal - SDM Consulting Engineers, Inc. Associate in charge of the Mechanical Engineering Systems Design and Construction Management Services overseeing the implementation of the intended design of the various engineering systems into the building. Education BSEE 1994, Bachelor of Science in Mechanical Engineering, Florida International University Professional Organizations ASME (American Society of Mechanical Engineers) ASHRAE (American Society of Heating, Refrigerating and Air Conditioning Engineers, Inc.) Green Building Certification Institute - LEED Accredited Professional Since 2009 SAVE International Relevant Experience MIC Earlington Heights Connector Mr. Martinez was the Lead Mechanical Engineer for the Mechanical design of this project involving a connector between the Miami Intermodal Center (MIC) and the Earlington Heights Metrorail Station (EHT) for the improvement of the existing transportation system by providing a transit connection to Miami International Airport. ' MIA Regional Commuter Facility Mr. Martinez was the Lead Mechanical Engineer for the Mechanical design of this 68,000 square foot commuter facility for American Airlines at Miami International Airport. The scope of work involves a new 3 -story addition, contiguous with and extending the existing North Terminal Concourse. This work will include a new covered walkway to extend from the concourse to access small commuter planes. MIA Automated People Mover (APM) Maintenance and Storage Facility Mr. Martinez was the Lead Mechanical Engineer responsible for overseeing all aspects of the Mechanical design for this APM maintenance and storage facility and main control room for said train system. This project includes the interior finish -out of approximately 87,000 sf of shell space ' and housing for the operation, maintenance, and service systems associated with APM vehicles, passenger stations and interface systems in general. 11: CGC1518494 MS: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 33 of 66 FL CMC12S0004 NC: 69344 O: 305.523.3656 1 F: 888.499.1748 1 LynxConstructionManagement.com RFQ# 13 -08 -01 TN: 63012 LJ 1 C H H L L 1 LJ r II x MANAGEMENT Miami -Dade County Parks & Recreation - Miami Southridge Stadium Mr. Martinez was the Lead Mechanical Engineer for the M /P /FP Engineering Design and Construction Administration Services of this project which includes a 1,500 seat stadium facility consisting of a concession stand, restrooms, pedestrian access and circulation, ticketing and admissions area, and full handicap accessibility to the entire complex. City of Miramar - Vizcaya Park Community Center (LEED) Mr. Martinez was the Lead Mechanical Engineer for this 7,660 gsf single story Community Center building. This facility will include spaces for recreation, computer education /activity, gaming, park concessions, an office, and other support functions. City of South Miami - Murray Park Multipurpose Center, Phase 2 Mr. Martinez was the Lead Mechanical Engineer of this project involving a two -story building of approximately 23,000 gsf which will house a multi - purpose program comprised of a gymnasium, office /classroom space, toilet rooms and support space, a parking lot, pedestrian walkways and related water, fire and sewer site utilities. Town of Miami Lakes — Royal Oaks Park Community Center (Certified GOLD Rated LEED Project) Mr. Martinez was the Lead Mechanical Engineer responsible for overseeing the Mechanical Engineering Design and Construction Administration Services for this single -story building of approximately 8,200 gsf Design -Build Municipal Community Center. FL: CGC15184M M5: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 34 of 66 FL: CMC1250004 NC:69344 O: 305.523.3656 1 F: 888.499.1748 1 LynxConstructionManagement.com RFQ# 13 -08 -01 TN: 63012 t-001 �X CONSTRUCTION MANAGEMENT Jorge Hammal Assistant Project Manager, Quality Control & Compliance Officer • 7 years in the Construction Industry • Construction Management and Design -Build Experience • Will assist the Project Manager on the day to day management of the project • Will be responsible for submittals, quality control and subcontractor compliance EXPERIENCE Lynx Construction Management — Coral Gables, FL 33134 Quality Control and Compliance Officer • Responsible for assisting the Project Manager in the planning • Setup and maintain Project Files including data input for all Logs. • Receive, Prepare, and Track all Submittals • Coordinate all contractual requirements, design drawings, and project specifications. • Nation -wide construction, engineering and management of multi - family and commercial projects. • Manage all aspects of commercial and multi - family and commercial property needs including rehab, construction, due diligence, and property condition assessments reports. BGT Partners— Miami, FL 33180 Developer /Project Manager Wendyvett Investments, Inc. - Miami, FL 33177 President • Prepare monthly sales tax returns • Order merchandise, and calculate year -end inventory • Handle customer complaints and concerns • Oversee all work related tasks • Facilities management EDUCATION Florida International University - December 2003 Master of Science in Engineering - GPA: 3.9 University of Miami - May 2002 Bachelor of Science in Information Technology - GPA: 3.2 Miami Dade College - July 1999 Associate in Arts in Computer Engineering - GPA: 3.9 FL: CCC1119484 M5: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 35 of 66 FL CMC1250004 NC:69344 0: 305.523.3656 1 F: 888.499.1748 1 LynxConstructionManagement.com RFQ# 13 -08 -01 TN: 63012 k 1 I 1 1 1 N X CONSTRUCTION MANAGEMENT Anouk do Pico Sforza Project Coordinator EXPERIENCE Lynx Construction Management — Coral Gables, FL 33134 Project Coordinator/ Office Administrator Assist office staff in maintaining files and databases • Prepare presentations, memorandums, proposals and correspondence • Monitor office operations • Schedule appointments and meetings for executives and upper level staff • Serve as the go -to for office inquiries • Manage staff schedules and Company calendar • Track office supply inventory and approve supply orders • Assist the estimating department in the pre -bid process • Assist in project coordination Freelance Logos Communications, Miami, FL Freelance Translator • Translate and transcribe texts from English to Spanish or Spanish to English • Translate messages simultaneously or consecutively maintaining message content, context, and style as much as possible • Ensure proper terminology usage in translations ' • Follow ethical codes that protect the confidentiality of information • Identify and resolve conflicts related to the meaning of words, concepts, practices, and behaviors TGI Fridays Miami Airport, Miami, FL 1 Server /Trainer • Ensure all cash has been accounted for at the end of shift • Train incoming employees • Display excellent customer service skills by welcoming and greeting guest with a smile • Demonstrate thorough menu knowledge • Prepare guest check and collect guest payment in an accurate and timely manner ' Sister's First, LLC, Miami, FL Office Manager • Organized office operations and procedures and controlled correspondence • Prepared payroll and designed filing systems • Assigned and monitored clerical functions • Maintained office efficiency by planning and implementing office systems • Maintained financial objectives by preparing event budgets, scheduling expenditures, and initiating ' corrective actions • Maintained office staff by recruiting, orienting, and training employees • Contributed to office staff as needed to reach desired results FL: CGC1518484 M5: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 36 of 66 FL: CMC1250004 NC:69344 0:305.523.3656 1 F: 888.499.1748 1 LynxConstruction Management.com RFQ# 13 -08 -01 TN: 63012 t. �Nx `!CONSTRUCTION MANAGEMENT t Qualfan Argentina, Buenos Aires, Argentina International Inbound Calls Agent • Provided customer support and researched required information using available resources • Handled inquiries and complaints about products and services • Completed call logs and produced call reports C� G k u 11 EDUCATION Miami Dade College, Miami, FL Candidate for Bachelors in Construction Management May 2015 GPA: 3.61 SKILLS • Proficient in Microsoft Office Programs (Excel, Outlook, Word, PowerPoint) • Proficient in Most Computer Applications • Bilingual — English /Spanish • Excellent Typing Skills - 65 WPM • Management Experience FL: C130519484 M5:18124-MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 37 of 66 FL: CMC1250004 NC:69344 O: 305.523.3656 1 F: 888.499.1748 1 LynxConstructionManagement.com RFQ# 13 -08 -01 TN: 63012 LJ I H 1 1 1 L I 1 1 L N X CONSTRUCTION MANAGEMENT 4. APPROACH / METHODOLOGY Sunny Isles Pedestrian Crossing Bridge Approach Lynx Construction Management will bring a team that has expert knowledge of the local working environment and the unique needs of government in the design -build process. Our staff and designers have a proven track record working in the South Florida area including major agencies and municipalities and institutions. We are currently working with FDOT, Town of Surfside, and City of Miami Beach- Jewish Community Services. We understand the reporting, project control and local wage requirement. As the design - builder we will create a partnership between the owner, architect and construction team to provide the best value project for the City of Sunny Isles Beach. Our emphasis on service will begin in the pre- construction phase and include coordination with all agencies having jurisdiction. It will continue through closeout to the end of the warranty period. We expect to create a long term relationship with the City that continues past the end of this project. Leadership and Mutual Goals Our senior staff has over three billion dollars of public sector design and construction experience and will bring that expertise and knowledge of public sector owner's needs to the project. This will streamline the planning, review, permitting and approval processes to keep the project on -time and within budget. We will provide the City with all of the information and support required to properly communicate project status to the community and the City Commission. Lynx Construction Management with the Owner will use our team approach to develop a project that meets our mutual goal of building a pedestrian crossing which will provide safe passage for people accessing the Gateway Park development and surrounding areas offering the best value engineering cost savings to the City. Collaborative Approach Lynx uses a collaborative approach which involves the entire team in all important decisions. It ensures that communication takes place regularly and that all important information is available to team members when needed. We use web based tools to maintain an environment that fosters effective communication. Our clients /owners, designers, and construction team are all provided access to our collaboration tools. 1 Design Philosophy for Sunny Isles Pedestrian Bridge Lynx will work with the City and MC Harry, our Architect, to develop a design approach in keeping with the beauty and environment of "Florida's Riviera ". Our team will listen closely and learn the needs of the City and the community. We will provide a structure that addresses the local values, function and aesthetics of the City. Our project will be on -time and in- budget. Lynx and our Design Team will: • Provide a safe pedestrian crossing 1 • Compatible with surrounding environment • Enhance the local aesthetic and beauty of the City FL: C13CI5184M 145: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 38 of 66 FL: CMC1250004 NC:69344 0:305.523.36561 F: 888.499.17481 LynxConstruction Management.com RFQ #13 -08 -01 TN: 63012 ' L �x .L CONSTRUCTION MANAGEMENT • Provide a gateway to the City • Use green and sustainable materials • Employ the highest quality standards • Stay within the allocated budget and schedule t Scope of Services Lynx Construction Management and MC Harry will provide the services necessary to design and build either the preferred option of a Pedestrian Crossing Bridge or the Secondary option of the surface level crossing. Our services will be delivered in a timely fashion with the full involvement of our local Team. Schematic Design and Site Plan Analysis During this phase we will develop the schematic design for both the surface crossing and the 1 pedestrian bridge. The design will take in to account the influences of the surrounding area including the ongoing "Gateway Park" development to ensure a compatible design and smooth construction process. We will work with the owner to ensure that all interested parties are included and there is buy -in from the Community. Design Development During the Design Development phase the plans will be further developed and the long -lead -time items will be ordered as early as possible. If a decision is made to choose the street level crossing option the permitting and civil work designs will be fast - tracked. During this phase alternates will ' be discussed to keep the project within budget. Our work is guided using the latest in LEED Principles. Our team is certified and experienced in LEED and will endeavor to design and build an environmentally compatible structure using sustainable, locally produced and recyclable materials and techniques. ' Construction Documents After the Design — Development documents are approved the final construction documents will be developed creating the drawings and specifications needed to provide a permitable, biddable 1 project. We will take the drawings to the various permitting agencies for "dry-runs' to facilitate the shortest possible permit process. The City's original budget will be respected and alternates will be proposed to keep the project in budget. We will work closely with the City to deliver the best possible value in this project. Reputation for getting the job done ' Our team has an excellent reputation for solving difficult problems and building our projects on- time and with -in budget. Recent projects with the FDOT requiring close coordination in occupied transportation facilities have gone of so well that our references gave us near perfect reviews. Project Commissioning ' Lynx implements a project commissioning process during the design phase of the project. This ensures that we are ready and aware of all required testing by vendors and subcontractors. This ' FL CGC1519484 M5: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 39 of 66 FL: CMC1250004 NC:69344 0: 305.523.3656 1 F: 888.499.1748 1 LynxConstruction Management.com RFQ# 13 -08 -01 TN: 63012 L N x —� CONSTRUCTION MANAGEMENT enables us to make sure it is completed prior to turnover. Our commissioning process ensures that all building systems are properly installed, that all manufacturer's testing and start-up is completed, all performance checks and adjustments are made before occupancy. Project Closeout and turnover Project closeout also starts at the commencement of the job. All information is gathered and organized throughout the project to ensure that a turnover of warranty and operating manuals occurs without delay at the end of the project. As -built drawings are maintained throughout the project to provide record of the actual project upon completion. During closeout any formal training necessary to enable the owner to properly operate and maintain installed equipment is provided. As the contractor we will do pre - punch -out work to ensure that there are no lingering punch -out items at completion. To ensure a smooth turnover Lynx Construction Management will ' be on the site for all turnover activities and training. We will turn over a complete set of close -out documentation to the Owner and a close -out book at ' substantial completion. Schedule detail Lynx uses Primavera the "state -of the art" in scheduling software. We update and maintain our schedules so we remain on -time and that opportunities to accelerate the project are not lost. We coordinate scheduling information with our subcontractors and suppliers in order to maintain critical milestones and the most efficient use of resources. DThis information is shared with the entire Team in the project meetings and using web based collaborative tools. All of our projects have been finished on or ahead of time. Cost control Lynx Construction Management implements cost control procedures at the onset of the project. We provide expert estimating in our pre - construction services department. Our estimators have over 30 years of local experience and know how to get the best value from our subs and suppliers. We strictly adhere to the owner's design criteria and provide design solutions and construction options that meet the budgets. Our pre - construction process consists of the following major steps: • Options and Alternates analysis Lynx Construction works with the designers and owners to ensure that the major items in the owner's design criteria are the priorities of the budget. Lower priority items are ' provided as alternates and options. • Design Review At each phase of the design development process the entire team is involved in a review of the owner's needs versus the design schemes. Drawings and specifications are reviewed and the input of the Owner, Architect and Contractor incorporated. FL CGC3518484 Ms: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 40 of 66 FL: CMC1250004 NC: 69344 0: 305.523.3656 1 F: 888.499.1748 1 LynxConstructionManagement.com RFQ# 13 -08 -01 TN: 63012 L N X —/CONSTRUCTION MANAGEMENT • Budget estimating Our estimator updates the budgets as the design development unfolds and shares the information to help the team make the best decisions in order to implement the owner's design goals. When the final construction documents are finished the final bids are taken and the project total cost is determined. IS Value engineering and cost benefit analysis Lynx implements true value engineering by ensuring that the major goals of the project are met when suggesting alternatives. The owner is involved in the decisions as to which alternates and options are selected and which construction techniques or materials will result in a "best value" for the owner. • Constructability Analysis During the process of design, the focus is on the construction means and methods as well as the materials available to provide the most effective process. Structural systems construction, availability of major components, mechanical and conveying systems availability and suitability, building envelope, roofing and finishes are reviewed to make sure that the project can be efficiently built on -time and in- budget. Construction Phase Lynx Construction provides expert management of the construction phase of the project from ground breaking until occupancy. Our staff is led by Chris Moran, President, who will maintain direct daily knowledge of the erection of the structures and completion of the buildings and direct involvement with the Owners. Mr. Moran has over 30 years of construction experience and has successfully completed all types of projects from underground to entire campuses comprised of many buildings. His experience includes over One Billion Dollars of construction in the Miami area. He provides the leadership to a team of fully experienced project managers and site superintendents familiar with the types of construction and systems which will make -up the ' project. • Onsite expertise Lynx will provide expert staff on the site during every day of construction operations. The staff will include a senior superintendent, superintendents, assistant project managers and project managers. The quality of our site supervision is responsible for our 100 percent success rate of completing projects on -time and within budget. • Project managers Our project management team is second to none. The senior project manager assigned to this job has both a Bachelor and Master's degree and over 15 years of experience in the local market. He has built many difficult projects at facilities that impact major institutions, transportation facilities and road ways where service cannot be interrupted. Knowledge of local conditions 1 FL CGC1518494 Ms: 18124 -Mc 45 Almeria Avenue I Coral Gables, Florida 33134 Page 41 of 66 FL: CMC1250004 NC: 69344 0: 305.523.3656 1 F: 888.499.1748 1 LynxConstructionManagement.com RFQ# 13 -08 -01 TN: 63012 L N x CONSTRUCTION MANAGEMENT Lynx construction staff are fully experienced interacting with the local environment ' including the authorities having jurisdiction such as building departments, FDOT, DERM, Fire and others. They are completely able to effectively move the project forward no matter what is encountered. We are familiar with working in the high density urban 1 environment, and with expected site conditions such as local soil conditions, the challenging and changing weather and how to deal with hurricane season. 1 L 1 1 • Safety, our first priority Our onsite staff will ensure that the public and construction workers are safe and that the site is kept fenced, with proper signage, proper protection and most debris and other safety hazards are dealt with immediately. Project staff is OSHA 30 certified. MOT and pedestrian traffic are of critical importance. • Ready for use when Gateway park is complete Our project will be completed in concert with the adjacent Gateway Park project and will be ready before the park and facilities are ready. Quality control Quality control is integrated into the entire project. The pre- design, pre - construction, commissioning and close out phases offer milestones to measure and report on quality control issues. However Lynx does not expect issues to arise since quality control is part of the daily activity of the staff. FL: CGC15184M M5: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 42 of 66 FL:CMC1250004 NC:69344 0:305.523.36561 F: 888.499.17481 LynxConstructionManagement.com RFQ#13 -08 -01 TN: 63012 S. REFERENCES Bill Evans (786) 350 -8190 F L �X —/ CON$TRUCTION MANAGEMENT January 18, 2013 Subject: Reference for Lynx Construction Management Town of Surfside Bill Evans Public Works Director 9293 Harding Avenue Surfside. FL 33154 Dear Chris. As we near completion of a long series of projects, I wanted to let you know what a pleasure it has been working with you, Jorge and the entire team at Lynx Construction Management. I am very pleased to have found a Construction Company I know I can count on for our Municipal and Public Works projects. I look forward to working with you again. Sincerely, FL: CGC1518484 MS: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 43 of 66 FL: CMC1250004 NC:69344 0:305.523.36561 F: 888.499.1748 1 LynxConstructionManagement.com RFQ #13 -08 -01 TN: 63012 "During the course of the three CDR Building Rehabs for the Florida Turnpike project, Lynx Construction Management's team has shown professionalism, honesty, and integrity throughout the construction process. They have followed the construction plans and technical specifications while maintaining the difficult construction schedule...” Jerry Hale, Senior Building Inspector FDOT FL CGC1518484 Ms: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 44 of 66 FL CMC1250004 NC:69344 0:305.523.36561 F: 888.499.17481 LynxConstruction Management.com RFQ#13-08 -01 TN: 63012 'N X CONSTRUCTION 1 —/ MANAGEMENT Jerry Hale ' Jerry.Hale @dot.state.fl.us CONTRACTOR FIELD PERFORMANCE REPORr ' OPaoac Q �O Fes+ Lyax, (d,.LTYp alo,i tN:+lwwo•rf; u•C 4i•IW'i•i- 9)•�t+5I41•f�F'l -1.91•Z^ Coeo-rm. N.M a I A� ro. A.alaw FN PMJW IV. (d .ppW ) EBtil A1, ?.-%S, 0.0..0 tan.a w. C1QWCaWWAmuI (ZaiIOJAnwOT t�NIPC Orr- 01 Typ.aNM Gnebtl btm.0op. ,o.owsmm e.com s .uA,.m.mr 9- SYY} 11 Wtl P. ONG 1. P,RI.a.at omrd u4 emaMa.,�Wmna uN.ak 9 } o.mY C+.RY m+�awa.mtNw vnal miera to ]. Oa50e upnabn am sal'sp Ino w rii N•.4 to Q.Ab..aYN W.OmweNa Rs�o } WYUmnpea0.f]capenuw a A CI }. Ebovreu apY.M mmpvn.K _` ' e fanYA]an,Omm Eawwpswrtpau to 9 Cppp.,aOpnwN Op.Nn.n, p.,Nrvel IR 10. F.W a..l-W awpM1.h Rw Smn= 8 Nm 1. tlYt.ro NyaOb.Onnwmmr.mg.Wn.W U(IOOI } tlM/YPY Op M .pyly m.h qMI WAW WPIkbrfq YMll.b YC PIYW AOiMI..IN -I 10 (Maa 9>D.WYn). 0 (Np_aalNnitff MA „• (IWWV1.RftV n.N!) 3B 4o R6 pRmq. ,tld xlm. (Ran Smal lNV -IIrtry AOm.Dk) (A.apl "During the course of the three CDR Building Rehabs for the Florida Turnpike project, Lynx Construction Management's team has shown professionalism, honesty, and integrity throughout the construction process. They have followed the construction plans and technical specifications while maintaining the difficult construction schedule...” Jerry Hale, Senior Building Inspector FDOT FL CGC1518484 Ms: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 44 of 66 FL CMC1250004 NC:69344 0:305.523.36561 F: 888.499.17481 LynxConstruction Management.com RFQ#13-08 -01 TN: 63012 1 �SURFSipF�y1 TOWN OF SURFSIDE fi �1 7 - J 92$3 HAROING AVENUE bIV1lIpIfP�� SURFSIDE. FLORIDA 33154 13051861 4863 • FAX: (305) 861.1302 ' W W W.T0WNOFSURFSIOEFL.GOV April 24. 2013 1'0 \l'hom 11 filar Concern: Lynx Construction Management has been a contractor for Surfsidc projects during in tenure as l'own Manager. The 1in11ras renovated Parking lots, upgraded our sidewalks with a concrete slain that greatly improved the look of our main highways and downtown area and other special projects like installing new electronic muhi -space meters. 'I'heir work has been fairly priced and of high quality. In tact mane citiiens speak highly of the renovations thin have been completed. 'I he Town of Surfsidc is very comfortable with I.ynv Construction Management and will continue to work with the lint in the future. Sincerer iRoger hl. Carlton Town Manager FL: CGC1518484 M5: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 45 of 66 FL: CMC1250004 NC:69344 0:305.523.36561 F: 888.499.17481 LynxConstruction Management.com RFQ#13 -08 -01 TN: 63012 L N X CONSTRUCTION MANAGEMENT Roger Carlton (305) 861 -4863 1 �SURFSipF�y1 TOWN OF SURFSIDE fi �1 7 - J 92$3 HAROING AVENUE bIV1lIpIfP�� SURFSIDE. FLORIDA 33154 13051861 4863 • FAX: (305) 861.1302 ' W W W.T0WNOFSURFSIOEFL.GOV April 24. 2013 1'0 \l'hom 11 filar Concern: Lynx Construction Management has been a contractor for Surfsidc projects during in tenure as l'own Manager. The 1in11ras renovated Parking lots, upgraded our sidewalks with a concrete slain that greatly improved the look of our main highways and downtown area and other special projects like installing new electronic muhi -space meters. 'I'heir work has been fairly priced and of high quality. In tact mane citiiens speak highly of the renovations thin have been completed. 'I he Town of Surfsidc is very comfortable with I.ynv Construction Management and will continue to work with the lint in the future. Sincerer iRoger hl. Carlton Town Manager FL: CGC1518484 M5: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 45 of 66 FL: CMC1250004 NC:69344 0:305.523.36561 F: 888.499.17481 LynxConstruction Management.com RFQ#13 -08 -01 TN: 63012 I 1 1 I I t. ? �N CONSTRUCTION MANAGEMENT Aimee McHale (202) 333 -8931 NHT /Enterprise Preservation Corporation May X 2013 Rc: Leisure Villas Remodeling 32 Units Residential Units/ 2 Apartment Buildings Ancillary Clubhouse/Storoge Building 'ro Whom It May Concern. ' FL: CGC1518484 MS: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 46 of 66 FL CMC12S0004 NC:69344 0:305.523.36561 F: 888.499.1748 1 LynxConstructionManagement.com RFQ #13 -08 -01 TN: 63012 We are pleased to offer a recommendation for Lynx Construction Management. As the General ' Contractor of Leisure Villas. Lynx deliscred excellence throughout the build out process. We are writing to express our thanks to your company. Lynx Construction Management, for ajob well done. Work was meticulously perforated within the estimated time frame as promised. Working fla Eyt[@pg fQxOUCw with your project manager, Brian Shirley etas a pleasure right from day one. Mr. Shirley was ' patient. listened to our wants and needs and made sure they wcm carried out. Your work crew was very cooperative and made sure that at the end of the day we were pleased by wttm they had done. ' They put a considerable amount of time into the little details. Again, credit goes to Lynx Construction Management for a first -rote job. We would not hesitate to refer Lynx to anyone looking for top quality service. 'Regards. Aimee McHale ' Assistant Vice President ' FL: CGC1518484 MS: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 46 of 66 FL CMC12S0004 NC:69344 0:305.523.36561 F: 888.499.1748 1 LynxConstructionManagement.com RFQ #13 -08 -01 TN: 63012 T RUU s T fla Eyt[@pg fQxOUCw ' 1101 30th Strm. NAXC . Suite 400 - Wmhington. D.C. 20007 - 202.333.8931 • FAX 202.833.1031 ' FL: CGC1518484 MS: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 46 of 66 FL CMC12S0004 NC:69344 0:305.523.36561 F: 888.499.1748 1 LynxConstructionManagement.com RFQ #13 -08 -01 TN: 63012 �x CONSTRUCTION t gc MGflury0;2r.a ALa Fonda 3013 Fmn dda Yor Awad To Wfiom 4 May Cvimn: 1 am plead b wTN In support d M G Harty 6 AWwm' nanatim b the ' AU Fbdd 1013 Fm d tla Yoe AwadYmn AYVavn aM Wdms n a MAN AGEN ENT Hfmric laMrsak aM ame&md mnmm aM npaan ptvantan a Dr. Joel M. Hoffman �aawl mmim�..- •Mabn Fa da pal ya,MGNany ham iatle ' (305) 250 -9133 mueryad dYmyi s Male Haas tla amol and fimmaul M1oradtlw ' paPmy N9at YZVya .v maa .adr.vc FormdAmionbwe�on Nan Deahrg In the 1 the Alin Ibada muayad.z apes b dse dnecia. Yawn wb aln. Aim MUmi -mde and wugunzda CN pabiM rtmsmm.:N yoramm apa +aaa m 1951. m da m,aee&ng de-ada n 3. baorta appaemt Out Om haYha +abh mM M �vpaniNY Paa� h* M � auul osrgliul an mlleaan Mdwa sigrdfim¢ m.Laanaeal adµmmm. Aad y In da and -19Nk Yraya's mmyad �a admnd a+d HVAC symma .ce VIZCAYA mallet tluwglun tlrt Man fhee wuwaacunw ' A,15. 3012 a madaa adm,aa porm m �# tlm skyngN and hued M G Harry Ma t gc MGflury0;2r.a ALa Fonda 3013 Fmn dda Yor Awad To Wfiom 4 May Cvimn: 1 am plead b wTN In support d M G Harty 6 AWwm' nanatim b the AU Fbdd 1013 Fm d tla Yoe AwadYmn AYVavn aM Wdms n a ' Hfmric laMrsak aM ame&md mnmm aM npaan ptvantan a �aawl mmim�..- •Mabn Fa da pal ya,MGNany ham iatle aduaad+maad b. da r.lammu d da la'g skyGgly oav tla moral mueryad dYmyi s Male Haas tla amol and fimmaul M1oradtlw ' paPmy N9at YZVya .v maa .adr.vc FormdAmionbwe�on Nan Deahrg In the 1 the Alin Ibada muayad.z apes b dse dnecia. Yawn wb aln. Aim MUmi -mde and wugunzda CN pabiM rtmsmm.:N yoramm apa +aaa m 1951. m da m,aee&ng de-ada n 3. baorta appaemt Out Om haYha +abh mM M �vpaniNY Paa� h* osrgliul an mlleaan Mdwa sigrdfim¢ m.Laanaeal adµmmm. Aad y In da and -19Nk Yraya's mmyad �a admnd a+d HVAC symma .ce mallet tluwglun tlrt Man fhee ee�aaethe munyadn da Vaal ag•d 4dem�dda Nam Haae. tl+e akydigM hu bemla a pnmma loam d d,e aanam M 3011 .e a�ggd M a madaa adm,aa porm m �# tlm skyngN and hued M G Harry Ma fimn eeemace aM dnaslfiN e,paiaica ddr dgava apPnaad' m Vial; and dau ab„aa eagmim m artne m da mhewi tlia wwdd be but ' Itlut � C Hany�aeaamsl i dbigwg a taw *11,0 mm�xaaoK m m hank wnamdh�ga aM c=p a. wch Wam -Dade Waays Immar mde Fan tla tegLmi�, M G Harty ampusd aM agwa'V1 m da ampmaa ' dtlus dullmge, mddig da high psdde d W � ad Ptr tea' 1 I M G Harry gdap�¢ Vag 3 aViniaa wOhm Oa mmawly abvahhv a dvdd Y halal M C Ha dedimM a Wg and �K horn b dd+ask aM amd a aWy Mo�Mos ad eaMemgs m dut.e mdd mFe ova�dY �Nund dedsbs Mama. M G Harty aabamd oa imam dy aim mmy has both Ipaida bbnamW Urvvuy ad da tlnieasny dMWd pvgsale N bnuavad� xvdalup ad VamAC'ai4' ad db allahaaaegpmd W mwdlmrcdsvlaM xtldy cggarmd rude M C Haman mlbt -vLL b g.ICy d Y, ad dwe uadamm ra n1baY fan dry me Ihda Pda -Ov —d Wi ad Nor mdemndingd da irtyartanae d YmYa Whm the holed Mori wa im- aAUiie The Gmfs ammam b h�nol dm0 b oho egab. M C Nary pesead Paaad and ddleaalmwtaNyammx vaan 0 M wM6ua em 6aP9am r. C nv,ry L.4. e d�aaaevho. Ab tla qm aM d1 M Wd� M C Nary Pgaed H� �iad Vora 4mbmbn -iv mmntim aadgiq N hvdmg aM daaad Rmvawi smpn -w�n "vmhade aM ammdy ypreaaed l wdd h mm J 16d na dart d�u, wMwv ezc�an M C Haas prtnryak aN mHrtmbaa hoe b� a plmue m v w malNammgml% da admO�aFry esm ametedDorm Amrg tlw fmy avd and p� PNed WY 55 Yon mdnmm, M C Ha a dmly a Gm�d�aMrsgamer +aMae. Vna4ry dvig aM m^mm0y mrahmvn T•dadmg pm ®ode rcw YYOgH.tM'maaaldl• •ITM, a+^^ak ddiotm,adaaussa W Wmw4ddem�lodma�pgea h n wM app,mam aM mpaadm 1 �mcd M G Harry 8 Aaaoma b A i 's3012firmd AeYw Awad 1 FL: CGC1518484 MS: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 47 of 66 FL: CMC3250004 NC:69344 0:305.523.3656 1 F: 888.499.1748 1 LynxConstruction Management.com RFQ #13 -08 -01 TN: 63012 ' L N X —/ CONSTRUCTION MANAGEMENT Jose Abreu (305) 876 -7000 ' Miami -Dade Aviation Deparmlmt P.O. Box 025504 l_ Miami, Honda 33101 -5504 ._. �... T 3054167000 F 3054260948 wv waniam rlxxtmm vdamidadeyov r �r.4 upon o.rcm.>sesare..ue. uxrr rye.. ov� April 5, 2012 q.ea. v.. ' American Instfhne of Architects Florida Chapter r• AIA Florida — 2012 Finn of the Year To Wham it May Concern ' Over the last 4 years I have had the pleasure and opportunity to work closely Win M.C. Harry & Associates on the Federal Inspection Service (FIS) facility project at WAS North Terminal Development (NTD) Program. This is a very dynamic and Complex project which involved renovations. remodeling and additions for a new stateof- tha-an 400,000 square feet facility for Imnigrabon. Agricultural and all oher Chatons Bader Protection (CBP) actMties associated with an in emabonal airport In all Instances, M.C. Harry & Associates has proven to be hgMy professional, owner Granted, and extremely mindful and responsible for our budgetary and time oorsba'uds lirnis, typically associated with large and complex projects such as acs. ' Throughout INS period M.C. Harry & Associates has excelled in their pedomhance of their duties, and the North termual Development program has received accolades from a myriad of trade industries and professional associations alike. Pad of the acclaim and success attributed to the NTD ' Program is related to the design and construction administration services proMed by M.C. Harry & Associates. lJ n 0 I I enthusiastically reconmed MC. Harry & Associates for their past pedamance a tndd them'vh the hg s fhest of esteert. incerey. os6 At Director JCAlia C. FL: CGC1518484 MB: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 48 of 66 FL: CMC3250004 NC: 69344 0: 305.523.3656 1 F: 888.499.1748 1 LynxConstructionManagement.com RFQ# 13 -08 -01 TN: 63012 Alex Rey (305) 364 -6100 4 z rh .Fd� "':_fir �c,ivin> 1 March 28, 2012 L � COMST RUCTION MANAGEMENT 7'own o'Aliami Lakes 15150N5V7 . ,Afiami lake lAorida 73016 (305) 364-610WPax (305) 5588511 vay.wamlvka.(Lgov E ,J I G I FL: CGC15194114 MS: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 49 of 66 FL: CMC1250004 NC: 69344 O: 305.523.3656 1 F: 888.499.1748 1 LynxConstructionManagement.com RFQ# 13 -08 -01 TN: 63012 To Whom It May Concern: ' Re: M. C. Harry & Associates, Inc. 1 have had many opportunities over the past years to work on numerous projects with the firm of M. C. Harty & Associates in my capacity as Town Manager for the Town of Miami Lakes. Thou projects have included: the design of our LEED Gold Royal Oaks Park Community Center, development of muter ' plans at the Miami Lakes Optimist Park and Picnic Park Emi. and design of our Boundless Playground and Florinda Estates Park. M. C. Harry & Associates should especially be recognized for working with our Town to achieve LEED Gold certification at our Royal Oaks Park Community Center. In this case, the Town was planning to achieve basic LEED certification for the facility. Through M. C. Harry's efforts, the Town achieved Gold certification at no additional expense to the Town. The project has been featured in several publications including the Florida Recreation and Parks Association's Facility Showcase Journal. The firm also provided pro bono design services for our state of the an Boundless Playground. The project provides children of all ages and abilities to play together in a safe, structured environment. In all instances, the firm of M. C. Harry & Associates has proven to be highly professional, interested in the owner's specific needs, and mindful of budgetary and time restraints. Many of the projects required innovative design concepts and highly responsive design services in which M. C. Harty and Associates has a great deal of experience. Pan of the success of these projects is directly related to the design and the efforts of M. C. Harty & Associates. I enthusiastically recommend M. C. Harty & Associates for their past performance and hold them ' in high regard. Sincerely, Ale E ,J I G I FL: CGC15194114 MS: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 49 of 66 FL: CMC1250004 NC: 69344 O: 305.523.3656 1 F: 888.499.1748 1 LynxConstructionManagement.com RFQ# 13 -08 -01 TN: 63012 ■� ¥ Sunny IT }�$� - i lid y! - +�: � �\ '' , _e - �.? �_� /��/ . on . • � � - - -- \�d�� - -�- L �NX CONSTRUCTION MANAGEMENT 7. CONTRACT FORMS Attached. FL CGC1518494 MS: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 51 of 66 FL: CMC1250004 NC:69344 O: 305.523.3656 1 F: 888.499.1748 1 LynxConstruction Management.com RFQN 13 -08 -01 TN: 63012 I n L 1 1 1 u 1 1 1 u DELIVER TO. City of Sunny Isles Beach City Clerk 18010 Collins Avenue Sunny Isles Beach, FL 33160 REQUESTFOR QUALIFICATIONS SECTION 6 BID SUBMITTAL FORMS "f> of suo "' OPENING: 10:00 A.M. * *BID OPENING DATE ** NOTE: City of Sunny Isles Beach is exempt from all taxes (Federal, State, and Local). Tax Exemption Certificate furnished upon request. Issued by: Purchasing Agent Date Issued: This Bid Submittal Consists of * *PUBLISH DATE ** Pages 19 through 22 Sealed bids are subject to the Terms and Conditions of this Request for Qualifications and the accompanying Bid Submittal. Such other contract provisions, specifications, drawings or other data as are attached or incorporated by reference in the Bid Submittal, will be received at the office of the City Clerk at the address shown above until the above stated time and date, and at that time, publicly opened for furnishing the supplies or services described in the accompanying Bid Submittal Requirement. RFQ 08 -03 -13 CONSTRUCTION MANAGEMENT SERVICES FOR GATEWAY PARK A Bid Deposit in the amount of 0% of the total amount of the bid shall accompany all bids A Performance Bond in the amount of 0? /6 /6 of the total amount of the bid will be required upon execution of the contract by the successful bidder and City of Sunny Isles Beach ProcurementAaent: Firm Name: Marn3nthony Tulloch Lynx Construction Management, LLC Commoditv Codefs): RETURN ONE fl) ORIGINAL AND FOUR f4) COPIES OF BID SUBMITTAL PAGES AND AFFIDAVITS FAILURE TO SIGN PAGE 22 OF SECTION 4 BID SUBMITTAL WILL RENDER YOUR BID NON- RESPONSIVE City of Sunny Isles Beach IRequest for Proposal No. 08 -03 -13 `/4 OF SUN F"' ACKNOWLEDGEMENT OF ADDENDA INSTRUCTIONS: COMPLETE PART I OR PART II, WHICHEVER APPLIES PART I: LIST BELOW ARE THE DATES OF ISSUE FOR EACH ADDENDUM RECEIVED IN CONNECTION WITH THIS BID PART II: Addendum #1, Dated August 30, 2013 Addendum #2, Dated Addendum #3, Dated Addendum #4, Dated Addendum #5, Dated Addendum #6, Dated Addendum #7, Dated Addendum #8, Dated ❑ NO ADDENDUM WAS RECEIVED IN CONNECTION WITH THIS BID FIRM NAME: Lynx Construction Mana ent, LLC AUTHORIZED SIGNATURE: I / � 'DATE: 09/04/2013 All TITLE OF OFFIC : President City of Sunny Isles Beach I Request for Proposal No. 08 -03 -13 L 1 1 1 1 1 k 1 'f4 OF SUN P�- BID SUBMITTAL FORM Bid Title: DESIGN BUILD SERVICES FOR GATEWAY PARK PEDESTRIAN ACCESS IMPROVEMENTS - STEP 1 The undersigned Proposers proposes and agrees, if this Bid is accepted, to enter into an agreement with The City of Sunny Isles Beach furnish all Work as specified or indicated in the Contract Documents and in accordance with the other terms and conditions of the Contract Documents. The Proposers accepts all of the terms and conditions of the Advertisement or Invitation to Bid and Instructions to Proposers. This Bid will remain subject to acceptance for 90 days after the day of Bid opening. The Proposers agrees to sign and submit the Agreement and other documents required by the Bidding Requirements within ten days after the date of the City's Notice of Award. In submitting this Bid, the Proposer represents, as more fully set forth in the Agreement, that: • The Proposer has familiarized himself /herself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Law and Regulations that in any manner may affect cost, progress, performance, or furnishing of the Work. • The Proposer has studied carefully all reports and drawings of subsurface conditions and drawings of physical conditions. • The Proposer has given the City written notice of all conflicts, errors, discrepancies that it has discovered in the Contract Documents and the written resolution thereof by City is acceptable to the Proposer. • This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation; the Proposer has not directly or indirectly induced or solicited any other Proposer to submit a false or sham Bid; the Proposer has not solicited or induced any person, firm or corporation to refrain from Bidding; and Proposer has not sought by collusion to obtain for itself any advantage over any other Proposers or over the City. The City and the successful Proposer will establish completion times for each individual Work Item and the successful Proposer agrees that the work will be completed within the time frames agreed upon and stipulated in the Notice to Proceed by the City Manager or his designee. City of Sunny Isles Beach I Request for Proposal No. 08 -03 -13 [1 1 1 1 1' 1 I 1] Firm Name: Lynx Construction Management, LLC Street Address: 45 Almeria Avenue, Coral Gables, FL 33134 Mailing Address (if different): N/A Telephone No. (305) 523 -3656 Email Address: info @Lynxcs.com Fax No. (888) 499 -1748 FEIN No. 26 0 3 * "By signing this document the bidder agrees to all Terms Sign ($i9eatu authorized agent) Print Name: Christopher Moran Title: President "4 of SUN nr' ' THE EXECUTION OF THIS FORM CONSTITUTES THE UNEQUIVOCAL OFFER OF PROPOSER TO BE BOUND BY THE TERMS OF ITS PROPOSAL. FAILURE TO SIGN THIS SOLICITATION WHERE INDICATED ABOVE BY AN AUTHORIZED REPRESENTATIVE SHALL RENDER THE PROPOSAL NON - RESPONSIVE. THE CITY MAY, HOWEVER, IN ITS SOLE DISCRETION, ACCEPT ANY PROPOSAL THAT INCLUDES AN EXECUTED DOCUMENT WHICH UNEQUIVOCALLY BINDS THE PROPOSER TO THE TERMS OF ITS OFFER. 1 I City of Sunny Isles Beath I Request for Proposal No. 08 -03 -13 I i n U n 11 F 1 I 1 1 1 I 1 SU N�NY irxE 01 NO \T- COLLUSION AFFIDAVIT - -) City of Sunny Isles Beach Y 18070 Collins Avenue :� •nos c +` Sunny Isles Beach, FL 33160 Telephone (305) 947 -0606 Fax: (305) 949 -3113 STATE OF FLORIDA I COUNTY OF Miami -Dade t The undersigned being first duly sw om as provided by law, deposes. and says: This Affidavit is made Win the knowledge and intent that it is to be filed with the City of Sunny Isles Beach City Commission and that it will be relied upon by said County, in any consideration which may give to and any action it may take with respect to this Bid. The undersigned is authorized to make this Affidavit on behalf of, Lynx Construction Management, LLC (Name of Corporation, Partnership, Individual, etc.) Limited Liability Company , formed under the laws of Florida (Type of Business) (State) of which he is President (Sole Owner, Partner, President, etc.) Neither the undersigned nor any person, firm, or corporation named in above Paragraph 10.2, nor anyone else to the knowledge of the undersigned, have themselves solicited or employed anyone else to solicit favorable action for this Bid by the City, also that no head of any department or employee therein, or any officer of the City of Sunny Isles Beach. Florida is directly interested therein. This Bid is genuine and not collusive or a sham; the person, fine or corporation named above in Paragraph 10.2 has not colluded, conspired, connived or agreed directly or indirectly with any proposers or person, fine or corporation, to put in a sham Bid, or that such person, firm or corporation, shall refrain from Bidding, and has not in any manner, directly or indirectly, sought by agreement or collusion, or communication or conference with any person, firm or corporation, to fix the prices of said Bid or Bids of any other proposers; and all statements contained in the Bid or Bids described above true; and further; neith - undersigned, nor the person, firm or corporation named above in Paragraph 10.2, has directly or indirectly submitted said Bi contents thereof, or divulged information or data relative thereto, to any association or to a m or agen hereof. Chri topher Moran President AFFIANT'S NAME AFFIANT'S TITLE TAKEN, SWORN AND SUBSCRIBED TO BEFORE ME this � day of September .200 1 . 3 Personally Known or Produced Identification , Type of identification (Affix seal here) 4F JORGE KWMAL MY COMMISSION 1 EE 1 EXPIRES: u* HI 2,206 .'.rFa `off° Boded TIN Bidgrt lktarl SaAas .) n2 ( F IQMPAI_ __NOT RY �U BLIC (name printed or typed) DEcousex 28, 29:0 1 of 7 I C I I LJ SVNNT 12rF PUBLIC ENTITY CRIMES City of Sunny Isles Beach .. 18070 Collins Avenue '. �Da. • no ^soo+ Sunny Isles Beach, FL 33160 oI su '� Telephone. (305) 947 -0606 Fax (305) 949 -3113 SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a) FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES PUBLIC ENTITY CRIMES Pursuant to the provisions of paragraph (2) (a) of Section 287.133, Florida State Statutes - "A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a Bid on a Contract to provide any goods or services to a public entity, may not submit a Bid on a Contract with a public entity for the construction or repair of a public building or public Work, may not submit Bids on leases of real property to a public entity, may not be awarded to perform Work as a Contractor, supplier, Sub - Contractor, or Consultant under a Contract with any public entity, and may not transact business with any public entity in excess of the threshold amount Category Two of Sec. 287.017, FS for thirty six months from the date of being placed on the convicted vendor list ". THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS. 11.1. This sworn statement is submitted to Citv of Sunnv Isles Beach by Christopher Moran Ipnm mmvwua,s name ano uuel for Lynx Construction Management, LLC Iponi name o1 enury suom ung svrom sunemeny whose business address is: 45 Almeria Avenue, Coral Gables, FL 33134 and (if applicable) its Federal Employer Identification number (FEIN) is 263104033 (If the entity had no FEIN, include the Social Security Number of the individual signing this sworn statement: NIA .) 11.2. 1 understand that a "public entity crime" as defined in Paragraph 287.133(1)(g), Florida Statutes, means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or with the United States, including, but not limited to, any Bid or Contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation. 11.3. 1 understand that "convicted" or "conviction" as defined in Para. 287.133(1)(b), Florida Statutes, means a finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trail court of record relating to charges brought by indictment or information after July 1, 1989, as a result of a jury verdict, non -jury trial, or entry of a plea of guilty or nolo contendere. 11.4. 1 understand that an "affiliate" as defined in Para. 287.133(1)(a), Florida Statutes, means: a.) predecessor or successor of a person convicted of a public entity crime; or b.) Any entity under the control of any natural person who is active in the management of the entity and who has been convicted of a public entity crime. The term "affiliate" includes those officers, directors, executors, partners, shareholders, employees, members, and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair DECBMBER28, 2010 2 of 7 1 market value under an arm's length agreement, shall be a prime facie case that one person 1 controls another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall be considered an affiliate. 1 11.5. 1 understand that a "person" as defined in Para. 287.133(1)(e), Florida Statutes, means any natural person or entity organized under the laws of any state or of the United States with the legal power to enter into a binding Contract and which Bids or applies to Bid on Contracts for the provision of goods or 1 services let by a public entity, or which otherwise transacts or applies to transact business with a public entity. The term "persons" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in management of any entity. 1 11.6. Based on information and belief, the statement which I have marked below is true in relation to the entity submitting this sworn statement. (Indicate which statement applies.) 1 X Neither the entity submitting this sworn statement, nor any of it's officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, nor any affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. 1 _ The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1 1989. The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, 1 shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. However, there has been a subsequent proceeding before a Hearing Officer of the State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer of the 1 State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer determined that it was not in the public interest to place the entity submitting this sworn statement on the convicted vendor list. (Attach a copy of the final order.) 1 I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 11.1 (ONE) ABOVE IS FOR THAT PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED. I 1 ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES, FOR CATEGORY TWO OF AW, CHANGE IN THE INFORMATION CONTAINED IN THIS FORM. 1 1 1 1 1 1 1 ier Moran Name) (Title) Sworn to and subscribed before me this 04 Christopher Moran (AFFIX NOTARY STAMP HERE) JORGE KAJ" MY COMMISSION t EE 165816 ���g9EaX�PIJRES: February 2, 2016 .ry ✓ Thu BU690 WVY Se day of September 20 13 , by Si natur Note pp,ublic — State of Florida 9 J04(E- ryHAmmm Print or Type Commissioned Name Personallv Known OR Produced Identification Type of Identification Produced 6�x4 3 of I SJN4Y 1,,E EOUAL OPPORTUNITY / AFFIRMATIVE ACTION '�•,{oa` ,= City of Sunny Isles Beach r {yM 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone (305) 947 -0606 Fax (305) 949 -3113 EQUAL OPPORTUNITY /AFFIRMATIVE ACTION STATEMENT The contractors and all subcontractors hereby agree to a commitment to the principles and practices of equal opportunity in employment and to comply with the letter and spirit of 1 federal, state, and local laws and regulations prohibiting discrimination based on race, color, religion, national region, sex, age, handicap, marital status, and political affiliation or belief. Signed: 1 Title: Presid t 1 Firm: Lynx Construction Management, LLC Address: 45 Almeria Avenue Coral Gables, FL 33134 DECoumR 28. 2010 4 of -1 1 1 SUNNY 1r1E oe�re _ n CONFLICT OF INTEREST i City of Sunny Isles Beach •.a } °. 16070 Collins Avenue J ' • r toP� o Sunny Isles Beach, FL 33160 � Or tVN Telephone (305) 947 -0606 Fax (305) 949 -3113 CONFLICT OF INTEREST STATEMENT The award of any contract hereunder is subject to the provisions of Chapter 112, Florida State Statutes. Proposers must disclose with their Bids, the name of any officer, director, partner, associate or agent who is also an officer or employee of the City of Sunny Isles Beach or its agencies. STATE OF FLORIDA COUNTY OF Miami -Dade BEFORE ME, the undersigned authority, personally appeared Christopher Moran who was duly sworn, deposes, and states: ' 18.1. 1 am the President of Lynx Construction Management, LLC with a local office in 45 Aimed, n „e„ a rnrnt r:nhlec FLand principal office in come ' 18.2. The above named entity is submitting a Bid for the City of Sunny Isles Beach, Bid No. RFna 1;i- f1R-ni described as: Landscape Maintenance Services. The Affiant has made diligent inquiry and provides the Information contained in this Affidavit based upon his own knowledge. 18.3 The Affiant states that only one submittal for the above Bid Is being submitted and that the above named entity has no financial interest in other entities submitting Bids for the same project. 18.4 Neither the Affiant nor the above named entity has directly or indirectly entered Into any agreement, participated in 1 any collusion, or otherwise taken any action in restraints of free competitive pricing in connection with the entity's submittal for the above Bid. This statement restricts the discussion of pricing data until the completion of negotiations if necessary and execution of the Contract for this project. ' 18.5 Neither the entity nor its affiliates, nor any one associated with them, is presently suspended or otherwise ineligible from participation in contract letting by any local, State, or Federal Agency. 18.6 Neither the entity, nor its affiliates, nor any one associated with them have any potential conflict of interest due to any other clients, contracts, or property interests for this project. 18.71 certify that no member of the entity's ownership or management is presently applying for any employee position or actively seeking an elected position with the City of Sunny Isles Beach. ' 18.81 certify that no member of the entity's ownership or management, or staff has a vested interest in any aspect of the City of Sunny Isles Beach. 18.91n the event that a conflict of interest is identified in the provision of services, I, on behalf of the above named entity, will immediately notify the City of Sunny Isles Beach. 13 is 04 day of September Ch 2016. / ! Christopher iCFFIA l� Print or Type Name and Title i Sw to and subscribed before me this y day of 1 �ril1'iC-lL 20 Personally Known OR O Produced Identification ;Type of Identification NOTARY PUBLIC STATE OF FLORIDA _p`tvr rugs JORGE HA kM _ MY COMMISSION t EE 165616 g EXPIRES: February 2, 2016 ,arm •rcc r,cF° Burled TMu Budad” sanw% OECIiu E 28.2910 1 5 of I SVryNV „f =0k DISPUTE DISCLOSURE V — Z City of Sunny Isles Beach t _ 18070 Collins Avenue ''r�'r•,io�zo' ` Sunny Isles Beach, FL 33160 Telephone: (305) 947 -0606 Fax' (305) 949 -3113 ' DISPUTE DISCLOSURE FORM Answer the following questions by placing a "X" after "Yes" or "No ". If you answer "Yes ", please explain in the space provided, or on a separate sheet attached to this form. 19.1. Has your firm or any of its officers, received a reprimand of any nature or been suspended by the Department of Professional Regulations or any other regulatory agency or professional associations within the last five (5) years? YES NO X 1 19.2. Has your firm, or any member of your firm, been declared in default, terminated or removed from a contract or job related to the services your firm provides in the regular course of business within the last five (5) years? YES NO X 19.3. Has your firm had against it or filed any requests for equitable adjustment, contract claims, Bid protests, ' or litigation in the past five (5) years that is related to the services your firm provides in the regular course of business? YES NO X If yes, state the nature of the request for equitable adjustment, contract ' claim, litigation, or protest, and state a brief description of the case, the outcome or status of the suit and the monetary amounts of extended contract time involved. I I hereby certify that all statements made are true and agree and understand that any misstatement or misrepresentation of falsification of facts shall be cause for forfeiture of rights for further consideration of this Bid for the City of Sunny Isles Beach. Lynx Construction Management, LLC DECEUeER 2e, 2010 09/04/2013 Date Christopher Moran, President Print or Type Name and Title 6 of I I [J L 1 I I H I 1 I Of SV NNY I,,EJS 9 A A 0P V OS SY �N STATE OF FLORIDA ) COUNTY OF Miami -Dade ) ANTI - KICKBACK City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone (305) 947 -0606 Fax: (305) 949 -3113 ANTI - KICKBACK AFFIDAVIT I, the undersigned, hereby duly sworn and deposed say that no portion of this sum herein Bid will be paid to any employees of the City of Sunny Isles Beach or its elected officials as a commission, kickback, reward or gift, directly or indirectly by me or any member of my firm or by an officer of the corporation. 0 Title: The foregoing instrument was acknowledged before me this 04 day of September 20 13 , by Christopher Moran [name of person], as President [type of authority], for Lynx Construction Management, LLC [name of party on behalf of whom instrument was executed]. JORGE MAMMAL MY COMMISSION t EE 165616 EXPIRES: February 2, 2016 •' +,�.e P Bodad Rev Budget Notary Sash n No a Public — State of Florida ) -y P.6E N&Awi Print or Type Commissioned Name Personally Known v OR Produced Identification Type of Identification Produced 7 of OECFUa:n Za. Mt0 7 of L N X CONSTRUCTION MANAGEMENT 8. ADDITIONAL 1 Licenses MUdA YDECWNTY�O yan]�1LOLti BU501E5H TA2 RECFVraArt�01] IR NHTf1LS4 COLtECTOR:.f..r 1Y,W{pAOE COUNry:BiAIE OF.0.DRbA QPgE98EPr.]4OMI]IAt.M:I .S. ]]l, ppJrA4E FuL ,1I_[�I [f YIATTBF C6PLATED'ATiFIACEOF WSINEBBf, APURSU ' YIA10,0. �FLOORt"1T'TD',� aW'1YL -MYI�` 5 1 ..$ CWNTYy CHAPTER AM I& FFA M.M THIS R: NOT A 861 -DO NOT PAY 656707 -8 RENEWAL RuvE45 NA]Q]Lp[Jrl6,] RQ NO. 683765-3 LYNX CONSTRUCTION NANAGENENT LLC STATER CBC057457 45 ALMERIA AVE 33134 CORAL SABLES OMIIEP LYNX CONSTRUCTION MANAGEMENT lLC f.T]mtlNWW YOR %ER /S ' ®e �'6.Wj: GENERAL BLDG CONTRACTOR 1 3 e CO NO[ Po1RAND LYNX CONSTRUCTION NANAGENENT LLC = CSR IR N MR" PRES 45 ALMERIAINERIA AVE ' CORAL GABLES FL 33134 m *9 /11/2012 09010291001 000049.50 162 ' GEE OTHER ®E Figure 1 Lynx: Miami -Dade Occupational License CRY OF MIAMI BEACH CERTIFICATE OF USE, ANNUAL FIRE FEE, AND BUSINESS TAX RECEIPT 1700 CmnwNm Genter UM 66M160laYL Ftrtla 031341019 ' TRADE]MYE LYMCOHSPRCIpN•'•Yfic .LLC REUIFr NUMBER: RL'IO>05733 IN CAPE OF: C149ALNRL9r=ER MORANi A ADpiE55 5TON I n i lk . .101q=%2 ' II .'F�n 060090/3 L6!1O BEACN.R]J1N2IXi3 `t` , I /. P"W O2.LTQOTAIP •Fnw,b npbi bYAwb4yvi Bi.e4�a Waq "] TRADE AOORE69. 5149 ALTON NO .weP.Smw®pa]mmlb,® t cer c.rmrr au.w0=wra A sibtllN.]awbi ri P.ibloe.s bws mYm calmnlcmlcamurANr mina.... bbnrm.o9 r. aabu ®mrnr am +tl. vemsw+uaFemir ®r mw mrserssw PEasr]wlrarlw rz5 bmi Km i,Y, Yn � b b Y W. fmYd 1b Poi mR i YbbY,p A Wqa AC.itl.bYY W. Obaavnibb� mHinnmF B baLVbue VnbCp IPZUmp>r 4blb Reaw M4C pbbb gVAp lbw af� AMY LVPmum, IE OFUg LLL CmWR 1 S�LU-45an ' FROM CRY OF MIAO BEACH P]F50RiF0 1700 MIM11 BEACH, Fl ]310.1819 BEACH.I L IE 151 Mn ' RNarwf3b CHRISTOPHER M MORAN 45A1MERUAVE CORALGABLES. FL 01344118 1 I„IIn 11. .bI6A6.6,611nnA1.,.III.A.11 ... I Figure 2 Lynx: Miami Beach Occupational License FL: CGC1519484 MS: 18120 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 63 of 66 C3012 004 NC: 69344 0 :305.523.3656 1 F: 888.499.17481 LynxConstructionManagement.com RFQ#13 -08 -01 7N TN : 63012 L �X CONSTRUCTION MANAGEMENT A • J------------------- Y D + ..m Raa YRNA /li' v +tA'-•71f'-1 AU6275176.•.- , ; STATE CF FLORIDA,, F`1 °G ta'; ic-• .t )I '�: ��, . r:; :•c >DEPARTMSNT- OF':BUSINESS AND PROFESSIONAL--REGULATZON .- • -; > :.CONSTRUCTION INDUSTRY`-LICENSING BOARD - - y- SEQ#i120e1601983 • LICENSER NBR�•4'►3?�c',zJL*4a,,,- 6i/16/2012. 128038040.L'CGC15184 84Y.,-� -_ The GENERAL?CONTRACTOR2, -?- ``�`.3k% "•- __"•`` ' -" ,Named'- the o. I9 CHRTIFZED Under the='piovie ions of Chapter. Expiration date: AUG 2014t0E� -_ -,k� (1T7 e .. •:.� -,. , ...: , . tip: o�.. �ic�: -• =�.�bs , , _, %iMORAN;4.CHRZSTOPHER-MARTIN r;_•• -'+tts� '" •. - , LYNX CONSTRUCTION - MANAGEMENT. 45 ALMERIA AVE .... '•�• Lac: -- ..,uVC,a _ CORAL _GABLES i FL „33134 "mom) s1!: 1,.' RICXSSCOTT., _ _� f KEN LAWSON -- GOVERNOR - , • .- - SECRETARY nI.CR1 AY AC RFn1 IIRFn RV I GW - Figure 3 Lynx: Professional License AC *JQ41.57e,.iH_. - ::'g c:�7` „r. - =. ^E; z 3l:au _'. = >�. �4%, ” DHPARTMHNT 30E- 'HIISINHS33 AND BROPESSIONAL•REGULATION BOARD ,OFA'ARCHITECTURE fi INTERIOR; DESIGN - _:1,:��i'• - .r $EQ #L72121300714, LICENSE NBR to -j z Sj,4"A .`. - _ .I ,12713%2012, 120243990 d?l A'CDO0986�.ya =: �r- . - ;�- The = ARCHITECT- 'yCORPORATION -:' >s + _ -- °1•��r' - Naiae'd'sielow:ZS CERTIFIEI)r:? _-= -IInder the =pro'vieioris ofi"Chapter Biri FS1 -y3 7 Expiration date: FEB. }28, 20158 - _ -, "- im C HARRYI'AND..ASSOCIATBS: INC *'_. .2780'S;DODGLAS "RD %. #302.:-:. ' "6 x MIAMI - '-•-FL 931332728^ Rv'2i,.4i'X.• t " `vim: .y_£'x' RZCX SCOTTc?,r:F l z•;7;i ?; ,:- Y .� Yi;_`;i '�,':y I `$ :. ' -'f KEN LAWSON P "- GOVERNOR SECRETARY DISPLAYAS REQUIRED BY LAW - .. Figure 4 MC Harry: Professional License T•— o t tate��oTf. �l�orida on Professional :3 g:inccrs Aiic is ihet �4d Bliss Nyitray; ne: q® is authorized under the provisiol to the public through o Profesaa - Expiration: MA_Tp;t Audit No: 22%:01501135 oFSeenon- Z1t023 F7orido.Statutes. to offer engineering services Ono_ ed'un_der Clwptcr 471, Florida stutuco. CA lie. No: Certifi otc'of. -wriiouou _04_ Figure 5 BNI: Professional License FL: CGC1518484 M5: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 64 of 66 FL: CMC3250004 NC: 69344 O: 305.523.3656 1 F: 888.499.1748 1 LynxConstructionManagement.com RFQ# 13 -08 -01 TN: 63012 H 1 1 h 1 1 1 1 C 1 u LJ Stat IM lc liremed ac o Prof E.pirati06: 2/,W.v15 A..A r N..- )3100151"b; X MANAGEMENT rich Figure 6 BNI: Professional License 'parr -f .�. S tatC': f " s O_ Boordf ,Aroffessil i vs � Attctts {Paul' Antpc s � tip• ,. la 1;,CCnbcj w u Ptufc E<protkm 2!28/201S Auet Net 'L'Lb[OI 1!7111 Figure 73NI: Professional License florido Stamm ►.E. Cc..Nc $5479 SI Lk. No:10p rida 4?), Florldo Stotum PX 1k. Wb: 47013 S. ix -.Am %oat State of Florida Board of Professional Erigineers AC[CSCS That SDM Consulting Engineers, Inc. FB.PE is authorized under the provisions of Secclon 71.023, Florida Statutes, to offer engineering services to the public through a Professional Engineer, duly licensed under Chapter 471, Florida Statutes. Expiracion:2/28/2015 CA Lic. No: Audic No: 228201500437 Certificate of Authorization 3791 Figure 8 SDM: Professional License 1 FL: CGC1518484 MS: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 65 of 66 FL: CMC1250OD4 NC:69344 O: 305.523.3656 1 F: 888.499.1748 1 LynxConstructionManagement.com RFQ# 13 -08 -01 TN: 63012 I i L N x CONSTRUCTION MANAGEMENT 4000 sa 5716 A.4.— Suite 01 lake worn. FL 33463 P. 5614325550 F_ 561 432 $442 FL: CGC15194M M5: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 66 of 66 FL: CMC1250004 NC:69344 0: 305.523.3656 1 F: 888.499.1748 1 LynxConstructionManagement.com RFQ# 13 -08 -01 TN: 63012 Bond Letter ■ —, , NIELSON, ROSENHAUS & ASSOCIATES T,Ptember3,2013 ' t City of Sunny Isles Beach 18070 Collins Avenue, 4u' Floor Sunny Isles Beach, FL 33160 1 �Re: Lvnx Construction Manaeement. LLC Statement of Bondability ' o PTO Whom It May Concern: 0 uThis is to advise you that our office provides Bid, Performance, and Payment Bonds for Lynx Construction ' Management, LLC. Their surety is Old Republic Insurance Company which carries an A.M. Best Rating of A +XI and listed in the Department of the Treasurys Federal Register. � z 'z Based upon normal and standard underwriting criteria at the time of the request, we should be in a Eposition to provide Performance and Payment Bonds for projects in excess of $12,000,000.00 for a single size range and $50,000,000.00 in the aggregate. We obviously reserve the right to review final ,contractual documents, bond forms and obtain satisfactory evidence of funding prior to final °commitment to issue bonds. w Lynx Construction Management, LLC is an excellent contractor and we hold them in highest regard. We feel extremely confident in our contractor and encourage you to offer them an opportunity to execute u ' any upcoming projects. This letter is not an assumption of liability, nor is it a bid or performance and payment bond. It is issued only as a bonding reference requested by our respected client. L v If you should have any questions, please do not hesitate to give me a call. 0 Sincerely, 0 u z rett Rosenhaus, Florida Resident Agent t 4000 sa 5716 A.4.— Suite 01 lake worn. FL 33463 P. 5614325550 F_ 561 432 $442 FL: CGC15194M M5: 18124 -MC 45 Almeria Avenue I Coral Gables, Florida 33134 Page 66 of 66 FL: CMC1250004 NC:69344 0: 305.523.3656 1 F: 888.499.1748 1 LynxConstructionManagement.com RFQ# 13 -08 -01 TN: 63012