Loading...
HomeMy WebLinkAboutReso 2013-2150RESOLUTION NO. 2013- :2 1 =�Q A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, AUTHORIZING THE CITY MANAGER TO UTILIZE PREQUALIFIED CONSULTANTS TO PROVIDE PROFESSIONAL ENGINEERING AND SURVEYING SERVICES FOR VARIOUS CITY PROJECTS WITH EACH OF THE FOLLOWING CONSULTANTS: CES CONSULTANTS, CALVIN GIORDANO AND ASSOCIATES, BERMELLO AJAMIL & PARTNERS, INC., AND RJ BEHAR & COMPANY, INC. FOR FISCAL YEAR 2013/2014, IN AN AMOUNT NOT TO EXCEED ONE HUNDRED THOUSAND DOLLARS ($100,000.00) IN AGGREGATE PER EACH FIRM; AUTHORIZING THE CITY MANAGER AND CITY ATTORNEY TO DO ALL THINGS NECESSARY TO EFFECTUATE THIS RESOLUTION; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the City of Sunny Isles Beach issued Request for Qualifications No. 12 -04 -02 for Continuing Professional Architectural & Engineering Services Firms Only (CCNA) for the provision of general architectural and engineering services to the City; and WHEREAS, on November 15, 2012 via Resolution No. 2012 -1997, the City Commission approved the following shortlisted qualified firms to perform engineering, architectural, landscape architectural and land surveying services: CES Consultants, Calvin Giordano & Associates, Inc., Bermello Ajamil & Partners, Inc., and RJ Behar & Company, Inc.; and WHEREAS, the City being satisfied with the performance of their work wishes to continue utilizing these prequalified Consultant firms, in an amount not to exceed One Hundred Thousand Dollars ($100,000.00) in aggregate per each Firm with any single contract or authorization above $25,000.00 going back to the City Commission, to give the City flexibility to select the firm deemed best suited for a particular project if needed and when needed. NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, AS FOLLOWS: Section 1. Authorization of City Manager. The City Commission hereby authorizes the City Manager to continue utilizing the consultant firms to provide professional engineering and surveying services for various City projects with the following four (4) prequalified Consultants: Bermello Ajamil & Partners, Inc., Calvin Giordano & Associations, Inc., RJ Behar & Company, Inc., and CES Consultants, to perform engineering, architectural, landscape architectural and land surveying services for fiscal year 2013/2014, in an amount not to exceed One Hundred Thousand Dollars ($100,000.00) in aggregate per each Firm provided that any single contract or authorization above $25,000.00 must be approved by the City Commission. Section 2. Further Authorization of City Manager and City Attorney. The City Manager and City 82013- Engineer Architect Firms Contracts Page 1 of 2 Attorney are hereby authorized to do all things necessary to effectuate this Resolution. Section 3. Effective Date. This Resolution will become effective upon adoption. PASSED AND ADOPTED this 21" day of November 2013. ATTEST: (�� k 4�� Jane A. Hines, MMC, City Clerk APPROVED AS TO FORM AND LEGAL SVPFICIENCY: City Attorney Vote: 5-b Mayor Edelcup _V(Yes) Vice Mayor Aelion v1 (Yes) Commissioner Gatto _y�(Yes) Commissioner Levin _(Yes) Commissioner Scholl (Yes) R2013- Engineer Architect Firms Contracts Page 2 of 2 �J s orman S. Edelcup, Mayor Moved by: ��� K„r kjj-%'0 10 Seconded by: G (No) (No) (No) (No) (No) LJ 11 J City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, Florida 33160 a (305) 947.0606 City Hall SoK � "o (305) 949 -3113 Fax MEMORANDUM TO: The Honorable Mayor and City Commission VIA: Christopher J. Russo, City Manager FROM: Helen Gray, PE, City Engineer DATE: 11/21/2013 RE: A Resolution Authorizing the City Manager to Utilize General Consulting Firms on an Approved List to Provide Professional Engineering and Surveying Services for Various City Projects RECOMMENDATION: We recommend cl;tv Commission approve the resolution. REASONS: In April 2013, City Commission authorized the City Manager to administratively approve various work authorizations with prequalified. consultants to a limit in aggregate of $100,000 per consultant. This authorization included a sunset provision and was for the remainder of FY 2012/2013 only. Staff has found that this procurement flexibility has expedited implementation of capital, maintenance and repair projects. The four prequalified consultants include: RJ Behar & Company Inc.; CES Consultants, Inc., Bermello Ajamil & Partners, Inc., and Calvin, Giordano & Associates. This request is to reauthorize City Manager approval. In Fiscal Year 2012/2013, the following Work Authorizations were approved as noted below: RJ Behar & Company - $63,981.00: Design phase services in the amount of $39,031.00 for the proposed privacy /security wall under the Lehman Causeway were approved by City Agenda Item No. 101 Date 1121/2013 173 Commission on March 21, 2013. The design has been completed and the project advertised for construction bids. In order to implement this project construction phase services in the amount of $24,950.00 was submitted for administrative approval. CES Consultants, Inc. - $6,275.00 includes: Geotechnical investigations, laboratory evaluation and engineering analysis and report for soils conditions on the Intracoastal Park for decorative column pile design by others in the amount of $3,450.00. Additional geotechnical investigation, laboratory evaluation and engineering analysis and report for percolation rates on the Intracoastal Park in support of drainage design by others in the amount of $2,825.00. Bermello Ajamil & Partners, Inc: Since professional services were approved by City Commission that in total exceeded $100,000 no additional services were authorized FY 2012/2013. Calvin Giordano & Associates - $31,318.25 and includes Engineering services in the amount of $5,675.25 related to utility service line design, permitting and installation at the Public Works modular under the Lehman Causeway. Preparation of an Elevation Certificate the amount of $625.00 for the Public Modular under the Lehman Causeway as required by Florida Building Code. Engineering services in the amount of $6,373.50 for electrical and lighting design for area lighting at Gwen Margolis Park for installation by the contractor installing artificial turf. Land surveying services in the amount of $5,027.50 for the preparation of a route survey in support of the solid wall under the Lehman Causeway. Land surveying services in the amount of $2,441.25 to prepare legal descriptions and sketches for temporary construction easements to facilitate the construction of the solid wall under the Lehman Causeway. Engineering services in the amount of $2,037.00 to evaluate before and after lighting levels resulting from the construction of the solid wall under the Lehman Causeway. Field Inspection, Construction Administration and Closeout services in the amount of $5,801.25 for the utility line installation from Collins Avenue to the pier project. Agenda Item No. 101 Date 11212013 174 ® Engineering services in the amount of $217.50 for renewal of the City's National Pollution Discharge Elimination System (NPDES) permit. Land surveying services in the amount of $2,195.00 for the preparation of a topographic and design survey for proposed bocce courts under the Lehman Causeway. Land surveying services in the amount of $925.00 to prepare a legal description and sketch for SFWMD required environmental mitigation areas. Any single project or proposal that exceeds $25,000 will be presented to City Commission for approval. COST: None at this time. ATTACHMENTS: . Resolution E J E Agenda Item No.I OJ Date 11212013 HS