Loading...
HomeMy WebLinkAboutReso 2019-2918 RESOLUTION NO. 2019- '211% A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, APPROVING CHANGE ORDER NO. 23 RELATING TO THE AGREEMENT WITH ROHL GLOBAL NETWORKS, LP FOR THE COLLINS AVENUE UTILITIES UNDERGROUNDING PROJECT, ATTACHED HERETO AS EXHIBIT "A"; AUTHORIZING THE CITY MANAGER TO DO ALL THINGS NECESSARY TO EFFECTUATE THIS RESOLUTION; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, on February 18th, 2016 via Resolution No. 2016-2525, the City Commission approved an agreement with Rohl Global Networks, LP ("Contractor"), for the Construction of the Collins Avenue Utility Undergrounding, in an amount of$4,830,000.00, and an owner contingency in the amount of $500,000.00, and an additional contingency in the amount of$1,500,000.00 for additional scope of work for Atlantic Boulevard, for a total amount not to exceed $6,830,000.00; and; WHEREAS, on February 16th, 2017, the Contractor submitted Change Order Nos. 1 through 6 which added: • 11,297 lineal feet of conduits as directed by the City; • Additional concrete removal and conduit placement in Town Center Park; • Completed miscellaneous below grade improvements on Collins Avenue and 195th Street; • Completed miscellaneous below grade improvements along the Atlantic Corridor; • Completed Collins Avenue due to the added scope of work and unforeseen conditions; and • Purchased material for the Collins Avenue Street Light Project; and Change Order Nos. 1 through 6 were in an amount not to exceed $4,967,989.00, bringing the total contract amount to not to exceed $11,797,989.00; and WHEREAS, on October 19, 2017 via Resolution No. 2017-2751, the City Commission ratified Change Order Nos. 7 through 9 and approved Changer Order Nos. 10-14, which: • Credited the City for direct material purchases in an amount of$528,677.28; • Credited the City for direct material purchases in an amount of$101,116.22; • Added 365 days to the length of the original contract thereby extending the completion date to March 31, 2018; • Repaired numerous pavement patches along Collins Avenue; • Repaved an additional 9,394 square feet along Collins Avenue; • Repaired and replaced the sidewalk on Atlantic Boulevard from 178th Street to 183rd Street WHEREAS, on February 15th, 2018 via Resolution No. 2018-2788, the City Commission ratified Change Order No. 15 and approved Change Order Nos. 17 and 18 with Rohl Global Networks, LP for credits to the City for direct material purchases, extension for project completion, recognizing a company name change, and decreasing the contract value in the amount of Seventy-Nine Thousand Five Hundred Dollars ($79,500.00), bringing the total contract amount not to exceed $13,581,192.50; and R2019 CO 23 w ROHL Networks Page I of 3 WHEREAS, on February 15th, 2018 via Resolution No. 2018-2789, the City Commission ratified Change Order No. 16 and approved Change Order Nos. 16A and 16B with Rohl Global Networks, LP for credits to the City for direct material purchases and the rescinding of Change Order No. 16, decreasing the contract value in the amount of Six Hundred Sixty-Six Thousand Two Hundred Fifty Dollars ($666,250.00), bringing the total contract amount not to exceed $12,914,942.95; and WHEREAS, on May 17th, 2018 via Resolution No. 2018-2816, the City Commission approved Change Order No. 19 for the addition and relocation of Florida Power & Light and Atlantic Broadband services equipment, revised Atlantic corridor scope of work, and other unforeseen conditions on Collins Avenue in the amount of$899,524.00; and WHEREAS, on September 20th, 2018 via Resolution No. 2018-2869, the City Commission approved Change Order No. 20 crediting the City for direct material purchases in an amount of$37,100.00, bringing the total contract amount not to exceed $13,777,366.95, and Change Order No. 21 in an amount not to exceed $34,796.00 for work and material completed to assure that the State of Florida RRR project did not adversely impact the work previously completed, bringing the total contract amount not to exceed $13,812,162.95; and WHEREAS, on October 18, 2018 via Resolution No. 2018-2879, the City Commission approved Change Order No. 22 to facilitate the ongoing installation of the Collins Avenue decorative streetlight project, alternate base installation to avoid utility conflicts, removal of abandoned bases as required by FDOT, provision of FPL power service points, and to establish a contingency allowance to resolve unforeseen and undocumented existing conditions in an amount not to exceed $400,000.00, bringing the total contract amount not to exceed Fourteen $14,212,162.95; and WHEREAS, the Contractor has submitted Change Order No. 23 in an amount not to exceed One Million Three Hundred Ninety-Nine Thousand Eighty-Nine Dollars and Fifty Cents ($1,399,089.50) to continue the Collins Avenue decorative street lighting and to replace the pedestrian crosswalk at 193rd Street in conjunction with Utility Undergrounding Project, bringing the total contract amount not to exceed Fifteen Million Six Hundred Eleven Thousand Two Hundred Fifty-Two Dollars and Forty-Five Cents ($15,611,252.45), attached hereto as Exhibit "A"; and WHEREAS, the City Commission wishes to approve Change Order No. 23 in an amount not to exceed One Million Three Hundred Ninety-Nine Thousand Eighty-Nine Dollars and Fifty Cents ($1,399,089.50) to continue the Collins Avenue decorative street lighting and to replace the pedestrian crosswalk at 193rd Street in conjunction with Utility Undergrounding Project, bringing the total contract amount not to exceed Fifteen Million Six Hundred Eleven Thousand Two Hundred Fifty-Two Dollars and Forty-Five Cents ($15,611,252.45), attached hereto as Exhibit"A". NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, AS FOLLOWS: Section 1. Approval of Change Order No. 23. The City Commission hereby approves Change Order No. 23 in an amount not to exceed One Million Three Hundred Ninety-Nine Thousand Eighty-Nine Dollars and Fifty Cents ($1,399,089.50) to continue the Collins Avenue decorative street lighting and to replace the pedestrian crosswalk at 193rd Street in conjunction with Utility Undergrounding Project, bringing the total contract amount not to exceed Fifteen R2019 CO 23 w ROHL Networks Page 2 of 3 Million Six Hundred Eleven Thousand Two Hundred Fifty-Two Dollars and Forty-Five Cents ($15,611,252.45), attached hereto as Exhibit"A". Section 2. Authorization of City Manager. The City Manager is hereby authorized to do all things necessary to effectuate this Resolution. Section 3. Effective Date. This Resolution shall become effective upon adoption. PASSED AND ADOPTED this 21St da; of Feb ary 2019. George Scholl, Mayor AT r.T 1 -- .1111 , 1_ . Mauri 10 :etan ur, CMC, City Clerk APPROVED AS TO FORM AND LEGAL SUFFICIENCY: /. ....1 Julia Grachova, I nterim City Attorney Moved by: 'R&. MO-pc &J /4ffJ Seconded by: G$04197.40n1c i2 cwt 01 14/ Vote: li Mayor Scholl (Yes) (No) Vice Mayor Svechin J (Yes) (No) Commissioner Goldman ✓ (Yes) (No) Commissioner Lama (Yes) (No) Commissioner Viscarra V (Yes) (No) R2019 CO 23 w ROHL Networks Page 3 of 3 teras CoC( c -10 r' Q sw•ANY IS44. s O 6 it. CI X. .: CONTRACT/+ CITY OF CONTRACT see . F'1.0- o5`' SUNNY ISLES BEACH Change Order CHANGE ORDER NUMBER: 23 DATE: February 4,2019 PROJECT: RFP NUMBER: 15-12-02 Collins Avenue Utility Undergrounding RESOLUTION NUMBER: TBD ORIGINAL DOLLAR CONTRACT AMOUNT: $ 6,830,000.00 NET TOTAL DOLLAR VALUE OF ALL PREVIOUS CHANGE ORDERS: $ -6799271-6-2-.95 1,310. U,a...50 CONTRACT AMOUNT PRIOR TO THIS CHANGE ORDER: $14,212,162.95 111 94.1/1,..50( ) DOLLAR AMOUNT THIS CHANGE ORDER: $ 1,399,089.50 NEW DOLLAR CONTRACT AMOUNT: $15,611,251.45 15, G11,A.52.0o ORIGINAL CONTRACT COMPLETION DATE March 31, 2017 TOTAL OF PREVIOUS CHANGE ORDER DAYS: 730 AMOUNT OF DAYS PER THIS CHANGE ORDER: 183 NEW CONTRACT COMPLETION DATE: September 30, 2019 DESCRIPTION OF SCOPE OR WORK CHANGES: 4 1,3 ,pt.Sa The Contract is changed as follows: Increase contract amount by $4;e68 9754 to continue Collins Ave decorative street lighting in conjunction with utility undergrounding project from 1580 St to 163rd St and 1850 St to 195t St and replace pedestrian crosswalks at 193rd St due to utility undergrounding. NOTE: Unless specifically stated clearly elsewhere on this page, this contract amendment does NOT include an extension of time or grant any additional general conditions amounts. The City and the Contractor agree that the contract time adjustment and sum agreed to in this document constitute a full and complete settlement of the matters set forth herein, including all direct and indirect costs for equipment, manpower, materials, overhead, profit and delay relating to the issues set forth in this document. ROHL Networks CONTRACTOR Michael Wiecinski CITY ATTORNEY: 4C------ PROJECT MANAGER: Paul T. Abbott Paul T. Abbott Chris Russo cid C CITY MANAGER: ._ d,4o.4. ZaefeArc Coatrjed oil tSJtF City of Sunny Isles Beach cr, Ao,_ ^ ale 18070 Collins Avenue • = Sunny Isles Beach, Florida 33160 , : 1• ti� ° ,F�.o ,4r (305)947-0606 City Hail ''`''*c.soy+, (305)949-3113 Fax MEMORANDUM TO: The Honorable Mayor and City Commission FROM: Christopher J. Russo, City Manager DATE: 2/21/2019 RE: Change Order#23 for Rohl Global Networks for Collins Avenue Utility Undergrounding Project RECOMMENDATION: This item is presented for your consideration. REASONS: An increase in the contract in the amount of $1,399,089.50 is requested to facilitate the ongoing installation of the Collins Avenue decorative streetlight project. This will include alternate base installation to avoid utility conflicts, partial removal of abandoned bases as required by FDOT, FPL power service points and connections there to, purchase an additional twenty (20) streetlight fixtures and poles which were not included in the FDOT design and establish contingency allowance to resolve unforeseen and undocumented existing conditions. Additionally crosswalks at Collins and 193rd street which were not included in the FDOT RRR project will be replaced. ADDITIONAL INFORMATION: The street lighting installation is being accomplished in four separate phases based on the timing of when FPL clears existing poles of overhead lines. Phase one Change Order #22 was previously approved for the first 61 light fixtures. This Change Order #23 will facilitate the balance of one hundred and one (101) to include the purchase of fixtures for installation at a later date. L 148 Approval of this item will result in a new Contract Total of $15,611,251.45 with a substantial completion date of September 30, 2019 notwithstanding any unforeseen circumstances. FUNDING SOURCE: Funding for this item will require a budget amendment to the Capital Improvement Program Fund account number 300-5-5390-465000- • 80004 to increase it by$1,000,000.00. ATTACHMENTS: Description Resolution Change Order No. 23 Item Number: 10.H. 149