Loading...
HomeMy WebLinkAbout5-2.3 QCProject No.: Superintendent's Name: Project Name: Subcontractor: Initials Location Subcontractor Supervisor Name:TGSV's SUB'S Date Item No. Item 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Item Comments QUALITY CONTROL CHECKLIST/REPORT ELECTRICAL UNDERGROUND SLAB PVC conduits covered and capped to keep debri from entering them Proper fitting being installed per spec All materials have UL listings PVC conduit & materials new & Per Specs PVC glue used on all fittings PVC conduits sized per drawing PVC conduit installation & location per drawings and specs. PVC conduit installed at proper depth Installation of conduits plum & level Jet line installed in conduits to assure conduits are complete and not damaged under slab prior to slab pour All materials stored properly Areas cleaned up after completion of work each day QUALITY CONTROL CHECKLIST/REPORT EXCAVATION Project No.: Superintendent's Name: Project Name: Subcontractor: Initials Location Subcontractor Supervisor Name:TGSV's SUB'S Date Item Spec. Sections No. Item 1 Prepare and submit soil notification form. 2 Determine disposition procedure. 3 Soil information is on job and reviewed. 4 Note elevation of water table. 5 Monuments and stakes are located. 6 Utilities to remain are located, staked and protected. 7 Verify utility companies have been notified. 8 Shoring and underpinning is provided if required. 9 Excavating does not cause unusual rutting. 10 Provide for public safety: barricades, fences etc. 11 Are well points required? 12 13 Drainage ditches are maintained. 14 Testing, inspection and compaction as required. 15 Compaction is performed in lifts required. 16 Building layout is established. 17 Elevations are established. 18 Observe setback and batterboards. 19 Waterproofing protected during backfilling. Item Comments Is dewatering if required in accordance to site specific and master dewatering plan permits? QUALITY CONTROL CHECKLIST/REPORT HYDRONIC PIPING Project No.: Superintendent's Name: Project Name: Subcontractor: Initials Location Subcontractor Supervisor Name:TGSV's SUB'S Date Item Spec. Sections No. Item 1 Hangers installed and straight. 2 Type of spacing correct. 3 Hanger spacing correct. 4 Piping in hierachy. 5 Expansion joints where required. 6 Penetration fire caulked. 7 Shoes installed where required. 8 9 Weld-o-lets installed where required. 10 Valves installed with handles in proper locations. 11 Thermometers and sensors wells installed. 12 Building Dept. inspections completed. 13 Insulation shield installed at every hanger. 14 Insulation seams sealed. 15 Pipes properly labeled with systems and directional arrows. 16 Gauges and thermometers installed. 17 Piping materials/fittings, methods of connection as specified. 18 Vapor barrier continuous. 19 Hand wheels on all valve as per specifications 20 Piping installed as approved shop drawings. 21 Sleeves installed on walls and floors penetrations. 22 Check color coding, if any. Item Comments Hydrostatic leak test completed successfully. Test results documented for file. QUALITY CONTROL CHECKLIST/REPORT INSTALLATION OF METAL DOORS Page 1 of 2 Project No.: Superintendent's Name: 10-10 Project Name: Subcontractor: TELEMUNDO Initials Location TGSV's SUB'S Date Item Spec. Sections No. Item 1 Required shop drawings & product data on-site approved 2 Doors are as approved-size, type design. 3 4 Check doors for damage at delivery. 5 6 Fabrication, construction & workmanship. 7 Smooth edges & joints, finish & straightness. 8 Additional reinforcement provided for hardware. 9 Observe backing plates during drilling operation. 10 Observe that closure channels are provided. 11 12 Observe type of factory-installed hardware. 13 14 15 Fire-rated doors have labels & proper identification. 16 Wire glass is provided. 17 18 Observed installation & verify proper clearance tolerances. 19 Doors are hung straight, level & plumb. 20 21 22 Observe glazing operation. 23 Factory prime is retouched. 24 Surfaces are adequate to receive applied finish. 25 Report doors that cannot be properly cleaned. 26 Silencers installed. Hardware is properly adjusted. Back set is matched to finish hardware. Stile edges, astragals, required for pairs or doors. Fusible-line holders provided, at louvers. Door functions smoothly and easily. Check panel, lights, louvers & features. Proper storage & protection provided at job site. Provisions to receive hardware are adequate. QUALITY CONTROL CHECKLIST/REPORT INSTALLATION OF METAL DOORS page 2 of 2 Project No.: Superintendent's Name: Project Name: Subcontractor: Initials Location Subcontractor Supervisor Name:TGSV's SUB'S Date Item Spec. Sections No. Item 27 Protection provided to avoid marring. 28 Dade County product control approval. Item Comments