HomeMy WebLinkAboutReso 2019-3004 RESOLUTION NO. 2019-
A RESOLUTION OF THE CITY COMMISSION OF THE CITY
OF SUNNY ISLES BEACH, FLORIDA, APPROVING CHANGE
ORDER NOS. 24 AND 25 RELATING TO THE AGREEMENT
WITH ROHL GLOBAL NETWORKS, LP FOR THE COLLINS
AVENUE UTILITIES UNDERGROUNDING PROJECT,
ATTACHED HERETO AS EXHIBITS "A" AND "B";
AUTHORIZING THE CITY MANAGER TO SIGN SAID CHANGE
ORDERS AND TO DO ALL THINGS NECESSARY TO
EFFECTUATE THIS RESOLUTION; PROVIDING FOR AN
EFFECTIVE DATE.
WHEREAS, on February 18th, 2016 via Resolution No. 2016-2525, the City
Commission approved an agreement with Rohl Global Networks, LP ("Contractor"), for the
Construction of the Collins Avenue Utility Undergrounding, in an amount of$4,830,000.00, and
an owner contingency in the amount of $500,000.00, and an additional contingency in the
amount of$1,500,000.00 for additional scope of work for Atlantic Boulevard, for a total amount
not to exceed $6,830,000.00; and;
WHEREAS, on February 16th, 2017 via Resolution No. 2017-2667, the Contractor
submitted Change Order Nos. 1 through 6, which added:
• 11,297 lineal feet of conduits as directed by the City;
• Additional concrete removal and conduit placement in Town Center Park;
• Completed miscellaneous below grade improvements on Collins Avenue and 195th Street;
• Completed miscellaneous below grade improvements along the Atlantic Corridor;
• Completed Collins Avenue due to the added scope of work and unforeseen conditions; and
• Purchased material for the Collins Avenue Street Light Project; and
Change Order Nos. 1 through 6 were in an amount not to exceed $4,967,989.00, bringing the
total contract amount to not to exceed $11,797,989.00; and
WHEREAS, on October 19, 2017 via Resolution No. 2017-2751, the City Commission
ratified Change Order Nos. 7 through 9 and approved Changer Order Nos. 10-14, which:
• Credited the City for direct material purchases in an amount of$528,677.28;
• Credited the City for direct material purchases in an amount of$101,116.22;
• Added 365 days to the length of the original contract thereby extending the completion
date to March 31, 2018;
• Repaired numerous pavement patches along Collins Avenue;
• Repaved an additional 9,394 square feet along Collins Avenue;
• Repaired and replaced the sidewalk on Atlantic Boulevard from 178th Street to 183rd Street
WHEREAS, on February 15th, 2018 via Resolution No. 2018-2788, the City
Commission ratified Change Order No. 15 and approved Change Order Nos. 17 and 18 with
Rohl Global Networks, LP for credits to the City for direct material purchases, extension for
project completion, recognizing a company name change, and decreasing the contract value in
the amount of$79,500.00, bringing the total contract amount not to exceed $13,581,192.50; and
R2019 CO 24 25 w ROHL Networks Page 1 of 3
WHEREAS, on February 15th, 2018 via Resolution No. 2018-2789, the City
Commission ratified Change Order No. 16 and approved Change Order Nos. 16A and 16B with
Rohl Global Networks, LP for credits to the City for direct material purchases and the rescinding
of Change Order No. 16, decreasing the contract value in the amount of$666,250.00, bringing
the total contract amount not to exceed $12,914,942.95; and
WHEREAS, on May17th, 2018 via Resolution No. 2018-2816, the CityCommission
approved Change Order No. 19 for the addition and relocation of Florida Power & Light and
Atlantic Broadband services equipment, revised Atlantic corridor scope of work, and.other
unforeseen conditions on Collins Avenue in the amount of$899,524.00; and
WHEREAS, on September 20th, 2018 via Resolution No. 2018-2869, the City
Commission approved Change Order No. 20 crediting the City for direct material purchases in
an amount of$37,100.00, bringing the total contract amount not to exceed $13,777,366.95, and
Change Order No. 21 in an amount not to exceed $34,796.00 for work and material completed to
assure that the State of Florida RRR project did not adversely impact the work previously
completed, bringing the total contract amount not to exceed $13,812,162.95; and
WHEREAS, on October 18th, 2018 via Resolution No. 2018-2879, the City Commission
approved Change Order No. 22 to facilitate the ongoing installation of the Collins Avenue
decorative streetlight project, alternate base installation to avoid utility conflicts, removal of
abandoned bases as required by FDOT, provision of FPL power service points, and to establish a
contingency allowance to resolve unforeseen and undocumented existing conditions in an
amount not to exceed $400,000.00, bringing the total contract amount not to exceed Fourteen
$14,212,162.95; and
WHEREAS, on February 21st, 2019 via Resolution No. 2019-2918, the City
Commission approved Change Order No. 23 to continue the Collins Avenue decorative street
lighting and to replace the pedestrian crosswalk at 193rd Street in conjunction with Utility
Undergrounding Project, in an amount not to $1,399,089.50, bringing the total contract amount
not to exceed $15,611,252.45; and
WHEREAS, the Contractor has submitted Change Order No. 24 for credits to the City
for direct material purchases, decreasing the contract value in the amount of Thirty-One
Thousand Four Hundred Fifty-Eight Dollars ($31,458.00), bringing the total contract amount not
to exceed Fifteen Million Five Hundred Seventy-Nine Thousand Seven Hundred Ninety-Four
Dollars and Forty-Five Cents ($15,579,794.45), attached hereto as Exhibit "A"; and
WHEREAS, the Contractor has submitted Change Order No. 25 to resolve unforeseen
and undocumented existing conditions with the installation of the decorative street lighting and
conduits along Collins Avenue, additional survey and as-built documents required by FPL for the
undergrounding along the Atlantic Corridor, and increase in costs due to delays related to
unforeseen conditions, in an amount not to exceed Nine Hundred Eighty-Two Thousand Six
Hundred Fifteen Dollars ($982,615.00), bringing the total contract amount not to exceed Sixteen
Million Five Hundred Sixty-Two Thousand Four Hundred Nine Dollars and Forty-Five Cents
($16,562,409.45), attached hereto as Exhibit"B"; and
WHEREAS, the City Commission wishes to approve Change Order Nos. 24 and 25 in an
amount not to exceed Nine Hundred Eighty-Two Thousand Six Hundred Fifteen Dollars
($982,615.00), bringing the total contract amount not to exceed Sixteen Million Five Hundred
R2019 CO 24 25 w ROHL Networks Page 2 of 3
Sixty-Two Thousand Four Hundred Nine Dollars and Forty-Five Cents ($16,562,409.45),
attached hereto as Exhibits "A" and "B".
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF SUNNY ISLES BEACH, FLORIDA, AS FOLLOWS:
Section 1. Approval of Change Order Nos. 24 and 25. The City Commission hereby
approves Change Order Nos. 24 and 25 in an amount not to exceed Nine Hundred Eighty-Two
Thousand Six Hundred Fifteen Dollars ($982,615.00), bringing the total contract amount not to
exceed Sixteen Million Five Hundred Sixty-Two Thousand Four Hundred Nine Dollars and
Forty-Five Cents ($16,562,409.45), attached hereto as Exhibits "A" and "B".
Section 2. Authorization of City Manager. The City Manager is hereby authorized to sign
said Change Orders and to do all things necessary to effectuate this Resolution.
Section 3. Effective Date. This Resolution shall become effective upon adoption.
PASSED AND ADOPTED this 17th da of Oct,ber 2019.
• �'. George . Scholl, Mayor
AT ST
Amid
rl'auricio Bet '`cur, CMC, City Clerk
1; i\;•
APPROVED AS TO FORM AND
LEGAL SUFFICIENCY:
zr
u6„),,,,,,,e ‘ 13/1'
Edward A. Dion, City Attorney
Moved by: CNAocz COLt A
Seconded by: GDOMIAIC-44°^1 - i
Vote:
Mayor Scholl (Yes) (No)
Vice Mayor Svechin (Yes) (No)
Commissioner Goldman Yes) (No)
Commissioner Lama (Yes) (No)
Commissioner Viscarra (Yes) (No)
R2019 CO 24 25 w ROHL Networks Page 3 of 3
City of Sunny isles Beach
i� (------n,-. ...,„„-% 1... 18070 Collins Avenue
•Surny Isles Beach, Florida 33160_ • J1• t
y., °9 a.° Sde (305)947-0606 City Hall .
`'>►0,,0.41-‘'.3 (305)949-3113 Fax
. MEMORANDUM ..
•
TO: The Honorable Mayor and City Commission
VIA: Christopher J. Russo, City Manager •
FROM: . Paul T.Abbott, Project Manager ,
•
DATE: 10/17/2019 .. .
Approving Change Order Nos.24 and 25 the the . .
RE: Agreement with ROHL Global Networks, LP for the
Utility Undergrounding Project -' .
5 RECOMMENDATION: :
It is recommended that the City Commission approve this proposed
resolution in support of increasing 'spending authority to Rohl Global
Networks LP (ROHL) referenced in tWo change orders for work
necessary to complete the Collins Avenue Utility Undergrounding and
Decorative Street Light Project.
REASONS:
1. Change Order #24 reduces the ROHL contract amount by
($31,458.00) for SIB direct purchase of material resulting in sales tax
savings to the project.
2. Change Order #25 increases the ROHL contract amount by
$982,615.00 which includes the following:
I • a. The original ROHL bid proposal included a unit price for three (3)
spread footings for decorative street lighting. To date, twenty three (23)
locations where unforeseen obstructions preclude the installation of
standard precast bases, have been encountered. The obstructions will
O require the utilization of spread footings. Due to the increased number
of spread footings a revised lower unit cost has been negotiated with
the contractor based on the increased quantity of foundations and
185
savings due to scale of operation.
• 0.
b. Easement negotiations with several properties along Collins Ave.
delayed the installation.of .FPL,equipment necessary. for the utility
•
undergrounding process resulting in additional cost for out of sequence
activities. .
•
c. Underground unforeseen obstructions were encountered at the Ritz
Carlton Residences project which further impacted the installation of
conduit for the utility conversion in Phase 1 of the project.
d. Change Order 14 included the• undergrounding of utilities along the
Atlantic corridor but failed to include the additional survey and as-built
documents required by FPL for the,ultimate installation ofconductor.
e. The above noted impacts require a contracttime extension:.and
related additional costs for General Conditions, Maintenance of Traffic,
Bond and Insurance. The original contract unit "rice for these items has
P
been reduced, on a monthly basis, due to reduction of resources
requires!. .
FUNDING SOURCE: .
300-5-5390-465000-80004 • •
ATTACHMENTS: S O
Description
Resolution
Change Order No.24
Change Order No.25 . .
Item Number: 10.F.
•
•
0
186
sJNN.Y.rs<
ri it • .
.,
___..____.
A.p.,:,. 1‘,
1
*� Coir OF CONIx,,l.‘_. r
'y,.,' 4 OP.SUNNY ISLES BEACH �_•
•
...,..
_ . Change !�.rer
... _ .
. _. .. _ „
_ ..._ __
. _ _., . .
. CHANGE ORDER NUMBER. . 24 •. • ' DATE:: ' October 17,-2019 . i i
i 1 PROJECT: - .
RFP NUMBER: 15-127(.2 .. . .:• CollinsAverrue Utility-Undergrounding
-- RESOLUTION NUMBER: TBD
...' ORIGINAL DOLLAR RA 1 AMOUNT: I $ 6;830,000.00 .
NET TOTAL DOLLAR VALUE OF ALL PREVIOUS.CHANGE ORDERS: $ 8,781,252.45
CONTRACT AMOUNT PRIOR TO THIS CHANGE ORDER: $15,611,252.45
DOLLAR AMOUNT THIS CHANGE ORDER: ' $ -31,458.00
I -.NEW DOLLAR CONTRACT AMOUNT: I $15,579,794.45
ORIGINAL CONTRACT COMPLETION DATE l' .March 31, 2017. :
TOTAL OF PREVIOUS CHANGE ORDER DAYS: 913
AMOUNT OF DAYS PER THIS CHANGE ORDER: 0
NEW CONTRACT COMPLETION DATE: September 30, 2019
- DESCRIPTION OF SCOPE OR WORK CHANGES:
The Contract is changed as follows: The Contract is changed as follows: Deduct Cliariga Order for Purchase
•
• Order issued by Sunny Isles Beach to Power&Tell Supply for direct purchase of material purchased by the City.-
. P.0.16-01192
i y.-
P.0.'16-04192 to P&T adding$29,400.00 and P.O.16-00792 to ROHL deducting$31,4p.00.
•
NOTE: Unless specifically stated clearly elsewhere on this page, this contract.amendmept does NOT include an
extension of time or grant any additional general conditions amounts. The City and the Contractor agree that the
• contract time adjustment and sum agreed to In this document constitute a full and complete settlement of the
matters•set forth herein,including ail direct and indirect costs for equipment, manpower,materials,overhead,profit
and delay relating to the issues set forth in this document.
- • ` *ROHL Networks l'Aichael . �iiski
• CONTRACTOR
Edward Dion
. - CITY ATTORNEY: . . I • —
Paul T. Abbott -
. P.ROJECTMANAGER: I r''w TO Abbott -
Chris Russo ,g`,
CITY MANAGER:
... „
•
•
. .
• "soiiNY i.•14\ . •
OC '-i•-• •"7- • .9
. - 0
- ...1- .4•3';•. i
v.; ..,1••\.::•• .,., -,,..- : • .
*'h• . ': • .#44'ra,, ; w r s-Tip 4-:
L* 1"\i'i 1 ''' 1-''CT
% „...--:, ,.....-. ..• _ . CITY OF
A ,..s. • -...,,... .......y-
Ts\L±. .L.i ......._____ .....9 _____jian .. , ,rder i.,4$UNNY ISLES BEACH
,.._ ',.. F0 v
-ge 4
: .
- CHANGE ORDER NUMBER: 25 . t DATE: : October 174 20.19
.:::;: .•-,...„:,..-;•.::-.,.:.. ' :,. .::::.,.. ; .
_ ______ • • .
. . . .., . .,, . . PRO4ECI•
. J . • , :: ,
••.. . • • i
RIP NUMBER: 1542702 r• Collins Wm:10:minty-IJridergkitincling
R
ION
RESOLUT -,NUMBE :.,-:.:: ., TBD • • ..- • • •••
..,. .. . _.. - . • . ..
- "
ORIGINAL DOLLAR CONTRACT.A r.viD.UM71T6,830,006O0
NET TOTAL DOLLAR VALUE OF ALL PREVIOU5CHANGEOMERS: 1•sit 144(:45.'' •
CONTRACT AMOUNT PRIORTO:THISIOAN:GE-ORDER:.1 $15;572,794.45 .. .
DOLLAR AMOUNT ti-ItsCHANGORakd $....;:::984615..60:.
. -
NEW DOLLAR CONTI:tACT-AMbUNT: '-$ 1.5,552,4K:45
I ORIGINAL CONTRACT-COMPLETIQN:QATE . .. :•:.. : .. . Match 31.,:Z0.17:.: . .:•
TOTAL OF PREVIOUS CHANGE ORDER DAYS: • 913
AMOUNT OF DAYS PER THIS CHANGE'ORDER: ' ...' ' :-:-' ''-' -. itr'-'
NW cONTRA7 COMPLETIQN DATE: . • • . .
: .
, • _
DESCRIPTION OF SCOPE OR WORK CHANGES: . , , .... .
. . . • . - • _
The Contract is changed as follows: Due to unforeseen condition With the.•utiiity Underground ConVersion
including unidentified existin^ utilities requiring plternatejoundation for decorative street fighting,project along . .
Collins Ave. Delayed schedule for installation. Of•E01.:e'quiPmeiil at•vadoiii pfoperties'along Collins, additional
surveying and as-built•documents .along...:Atlantic.and„exterIOci.,gffraj..oppclitiOn :and Irrid..coSts;due to
lengthened completion date. • . . .. ..
.
• NOTE: Unless specifically stated clearlyon
.:alseWhere :this;page,.,thicontract ta.!-Ilgricirnnt,doq..5 NOT include an
extension of.time or grant any additional general conditions amOuntS. The City and the Contractor agree that the
contract tinie.adju`strnent and sUm agreed to in this document constitute a full and complete settlement of the
matters set.fitithihereib,including all direct and iridlr&t costs for etliiip.M0t,..tranpOve'r;.ffia(arialSZOVerhead,profit - •
and delay:relating t.4...theissua§-set feetif in tHs•dckuMent. •.., • . .: .:.:-::,:•:::: .•: ....:::.Y.•<:, 1. ';'..:;::. •••-•..•:-...:...-1 ; • :•
•• T:-!,:.:;1•:. .i„,:':. ---I:KOHL Networks .. --; ::. ; •::. :111.tha.-0[Wietintki .
. .
CONTRACTOR .. • .- - - •:.:- : ,:. : •. •-- ''•. ,... .::... .. :.:; 0!
- ••••. . •• .
• • • • . - •• .- • •-
,. ' Edward Mon
• •-• •• - • - - - . - •• . •
CITY.ATTORNEY:_ .. .:'.•:-..-:' •::...": : • :` • '66"da41 .. :. -: .
. • • Paul T. Abbo4 Paial.T. -Abbittt .
PR03Ect MANAG ER: - • • - - -
: • Chris Russo - l'Oe_ill/L -
— .... .
- ....„. CITY MANAGER: . . , . .
i -......, - - .
, •
• . .
.•
_ ,
'.-•'W.,:,;-'34:- 1-._ , '
• a . Id 'A Ir • H 7 -
., <:,,e, k - 11 . •
TProposed Change Order
NEWORKS
•
. • .
. -
PROJECT: - _ .. ... . _._. ..
TO CONTRACTOR:
Collins Avenue Utility Undergrounding •
• • Rohl Global Networks LP
• . .'.. City OiT.S..unny 1s)es.B.eacii:- •.•
-• 2375 Jupiter Park Dr:STE 900
-- - • 7
8
100 Collins Ave.
. .•••11.1P.ilc.r,F•i-,1.10$-
SunnY Isles Beach,FL 33160 • .
' .
•- .
. _ .
, • . - Change Order NUM her . - '2.5-
.. . . .
.
- 1 - . • Date: - •. .
.4 September 25,2019. .. .. .
: _
' • Architect,s.Project Numb.er: • .
15-12702 . • : :., .,
Contiaet.Date: February 18,2016
Contract For: Collins Avenue Utility:Undergroiinding •;
-• .
.. . . . . . . - •
- • .
The Contrac.t is•chatiged as follows: . .
.
-• . .
Change Order for additional items as described below: . •
. • -.. .
. ..• i - •
Extend General Conditions/MOT 3.--inontbs`@$51,150.00=$173,250 and:4—Months(0,
I , $35,000:00 for a total of$341;250:00:
. ..• . . . .:.• , . • . .!
Remob and Installation of delayed FPL,VaultS'arki Conduit at RK, Miiiennitim=$15,000.00
. . . _ .. .
Install 4 FPL pieces at-Saharariurqberry ..4.x:$.3.,500.6a==$14,000.00 • ' • . •
• • - • -
Relo FPL at Miami Beach Club and Thunderbird=$.3,520.00 •
Allowance for 30 Spread Footers& Sidewalk PrOtection @$11,500 ea-=$35.0,000.00 -
.., • - -
. Allowance for obstructions at 45 streetlight locations$2,640.00 Labor and.$1;180.00.Vac= -
.
$171,900.00
.. . •.
•
- - Correct FPL at the Ritz=$34,750 00
• -
. . -Testing and-Surveying on Atlantic corridor=$.-6(090.o0 .• -• .— ' - -- t .• •• . .
. -
• AlleWance for.additiOnal Bond CdSrthrii April 2020 $.19,695:00.--. . • • • • - '•
Increase PO issued by CO of Sunny Isles Beach to as follows: , •
. .
1 .The original contract Om was: ; •:. -, ' •••• *: • .. • .. . ' • . : 36,8400.0;00 ....• :
. .
'
The net eh*by previously authorized'Change Orders . .. :.. : ...• •-•'.* -: :$8;149,194:45F,..*. :! •. i
- - The Contract Siun.kiorto.this Change Order was ' •:: : •:.:.. ••:..• ..1 :, . : .:. .W3400.94.4-5:
. . . .
The Sum will be increased bY.,:thiS Change Order.in he amount of. •1 : ': $982,615.00
- The new Contract Sinn;including this Change Order,will be: • ..S16;$0,400.4$
The Contract Time Willbe increased by210
• - --
- • - Therefore,the date of Substantial Completion as of the date of this Change Order is: 1 .Apiii 30,202.,0 . •
". - • ' " ' - ' - • • ' .
. . _ .. . . .
, •
- . • ••
. . • .
•_
. .
•-- - . V END OF DOCUMENT , . .._..
: . _ • .
. -
•
531
3 K-- Proposed Change Order
.E� : r ': ., NETWORKS g
• NOT VALID UNTIL SIGNED BY THE ENGINEER, CONTRACTOR AND OWNER.
_ I
ENGINEER CONTRACTOR • OWNER
Ii
Michael
SIGNATURE SIGNATURE
Wiecinski
PRINTED NAME
SIGNATURE PRINTED NAME
Michael Wiecirski
DATE PRINTED NAME DATE
9-25-2020
DATE
•
� I
•
END OF DOCUMENT
ED )d 44 IV H
$ � Proposed Change Order
NETWORKS p
PROJECT: TO CONTRACTOR:
Collins Avenue Utility Undergrounding• Rohl Global Networks LP
City of Sunny Isles Beach " 2375 Jupiter Park Dr.STE 900
18070 Collins s Ave.
Sunny Isles Beach,FL 33160 Jupter,.FL 33458
•
Change Order Number: 25
- Date: - :
*41k
Eg
F ' H!
.491'"
NETWORKS
Proposed Change Order
NOT VALID UNTIL SIGNED BY THE ENGINEER, CONTRACTOR AND OWNER.
ENGINEER CONTRACTOR • OWNER
Michael
SIGNATURE SIGNATURE
Wiecinski
PRINTED NAME SIGNATURE PRINTED NAME
Michael Wiecinski
DATE PRINTED NAME DATE
9-25-2020
DATE
• END OF DOCUMENT
193