Loading...
HomeMy WebLinkAboutEAC Consulting, Inc.CITY OF SUNNY ISLES BEACH PROFESSIONAL ENGINEERING AND ARCHITECTURAL SERVICES FOR PEDESTRIAN BRIDGE WITH PARK ELEMENTS ACROSS A1A AT 174TH ST. RFQ 19-11-01 • January 13, 2020 • Copy A TITLE PAGE A. TITLE PAGE EAC Consulting, Inc. eacconsult.com City of Sunny Isles Beach • RFQ 19-11-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. TITLE PAGE RFQ 19-11-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. – CCNA Respondent Firm: EAC Consulting, Inc. Address: 5959 Blue Lagoon Drive, Suite 410 Miami, FL 33126 Phone Number: (305) 265-5400 Contact Persons: Harold Desdunes, PE – Principal-in-Charge hdesdunes@eacconsult.com K.T. Lin, PE, PhD. – Project Manager klin@eacconsult.com Date: January 13, 2020 B TABLE OF CONTENTS B. TABLE OF CONTENTS EAC Consulting, Inc. eacconsult.com City of Sunny Isles Beach • RFQ 19-11-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. TABLE OF CONTENTS A: Title Page B: Table of Contents C: Cover Letter and Executive Summary D: Project Approach and Understanding E: Qualification Information nd Attached Personnel F: Firm References and Similar Work Completed G: Corporate Standing and Authorized Signatory H: Variations/Exceptions I: Litigation Statement J: Forms and Attachments C COVER LETTER AND EXECUTIVE SUMMARY C. COVER LETTER AND EXECUTIVE SUMMARY 5959 Blue Lagoon Drive • Suite 410 • Miami, FL 33126 • 305.265.5400 • eacconsult.com January 13, 2020 City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, Florida 33160 Re: RFQ 19-11-1 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th Street. – CCNA Dear Selection Committee: We congratulate the City of Sunny Isles Beach for a strong sense of community and safety as it pursues its vision to engage and enhance the community’s quality of life. The Sunny Isles Beach of the future is a community with high mobility and accessibility to neighborhood amenities for its residents, a place where the movement of local and regional people and goods is provided by street, water, transit, pedestrian, and bicycle systems that are complete and fully integrated. EAC Consulting, Inc. (EAC) is pleased to submit this proposal package in response to the City’s Request For Qualifications (RFQ) to provide professional engineering and architectural services for the Pedestrian Bridge with Park Elements across A1A at 174th Street. Understanding of Scope of Work EAC is fully aware of the importance of this project to the City, and to the potential improvement of pedestrian mobility in the community. The project’s purpose is to provide safe pedestrian and bicycle access over Collins Avenue at 174th Street. There is currently a need for pedestrians and cyclists to safely and conveniently cross Collins Avenue to access the Gilbert Samson Park, the beach and numerous retail shops on the west side of Collins Avenue. EAC is a FDOT certified firm that specializes in bridge design. We have built a team with the capabilities to provide the professional engineering and architectural services for the proposed pedestrian bridge at 174th Street. This pedestrian bridge will be designed as an elevated park, with attractive landscaping features and a safe pedestrian pathway. EAC’s familiarity with the tasks anticipated makes us qualified to successfully complete this project. Some of the unique qualifications of the EAC Team assembled for this project are: 1. EAC understands the requirements of the FDOT’s Local Agency Program (LAP) Manual as it relates to projects such as this that involve a bridge structure crossing a roadway. We will comply with -the FDOT’s latest revisions to the LAP Manual and the Florida Design Manual for these bridges. 2. EAC has included a Peer Review firm on our team that will review not only the design of the bridge, but also the construction sequence. 3. EAC has a proven reputation for providing notable bridge structures, including pedestrian bridges. In 2019, EAC successfully completed the design of the pedestrian bridges for the HardRock Stadium as part of a design build contract. 4. EAC’s commitment to public safety will result in a successful project. Our Commitment to RFQ No. 19-11-01 EAC is committed to the practice of engineering, as well as to maintaining excellence in the quality of our services. We pledge and commit to perform the proposed scope of work for RFQ No. 19-11-01 in accordance with the terms of the response being submitted. Our team is ready and available to immediately start work. We have reviewed the scope of services for this project and have selected a Project Team to ensure that the City of Sunny Isles Beach is provided with the required qualified skills to effectively complete all the services called for in this RFQ. EAC Consulting, Inc. eacconsult.com City of Sunny Isles Beach • RFQ 19-11-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. Our High-Performance Full-Service Team •Project Management, Structures, Civil, Lighting and Construction Management Engineering Services - EAC Consulting, Inc. •Architectural Services - Rosales + Partners •Landscape Architectural Services - Savino and Miller Design Studio •Structural Engineering Support Services - ASA Consultants, Inc. •Bridge Inspection Services - LARS Engineering, Inc. •MEP Engineering Services - TLC Engineering Solutions •Traffic Engineering Services - Choice Engineering Consultants, Inc. •Surveying Services - Manny G. Vera & Associates, Inc. •Geotechnical Engineering Services - GEOSOL, Inc. •Environmental and Irrigation Services - Smart-Sciences, Inc. •Cultural Resource Services - Janus Research EAC’s Experience EAC has experience in pedestrian bridge design including some recent projects in Miami-Dade and Broward counties: the Hard Rock Stadium Pedestrian Bridges, in the City of Miami Gardens; the Snake Creek Pedestrian Bridge, in the City of North Miami Beach; and the NW 21st Street Avenue Pedestrian Bridge Over C-13 Canal, in Oakland Park. EAC satisfied the needs of all the cities listed, and met the budget and schedule requirements of each project. Planned Project Approach EAC’s Miami office located at 5959 Blue Lagoon Drive, Suite 410, Miami, FL 33126 will be responsible for this contract. Harold Desdunes, PE (hdesdunes@eacconsult.com), former FDOT District 6 Director, will serve as the Principal-in-Charge for this project. Kuo Ting “K.T.” Lin, PE (klin@eacconsult.com) will serve as the Project Manager with Stephanie Romero, PE (sromero@ eacconsult.com) serving as Deputy Project Manager. We can be reached at (305) 265-5400. EAC’s reputation was built on projects requiring the satisfaction of our clients’ needs through: Effective Client Service; Innovative Engineering and Solutions; Budget and Schedule Control and the Provision of Quality Services. About EAC EAC was founded 25 years ago as a full-service multi-disciplined engineering firm that provides governmental agencies with consulting services. Recognized as one of Miami-Dade County’s consulting engineering’s success stories, our firm’s overall commitment to the practice has resulted in outstanding growth. EAC offers a wide variety of engineering services - including planning, design and construction administration, and has the specific expertise required for successfully delivering this project. Some of our clients include: Florida Department of Transportation Miami Dade Parks and Recreation Department Miami Dade County Public Works Miami Dade Aviation Department Brightline (Virgin Trains)Miami Dade County Housing Agency City of Miami Beach Miami Dade County Public Schools City of North Miami Broward County Public Works Department City of Miami Broward County Water and Wastewater Services City of Hallandale Beach Broward County Parks & Recreation Department City of North Miami Beach Broward County Aviation Department City of Ft. Lauderdale Broward County Public Schools Village of Palmetto Bay South Florida Water Management District Village of Islamorada Palm Beach County Public Works Department Miami Dade Water and Sewer Department Orlando Orange County Expressway Authority Miami Dade Department of Environmental Resource Management Greater Orlando Aviation Authority D PROJECT APPROACH AND UNDERSTANDING D. PROJECT APPROACH AND UNDERSTANDING EAC Consulting, Inc. eacconsult.com City of Sunny Isles Beach • RFQ 19-11-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. PROJECT APPROACH AND UNDERSTANDING Members of the Selection Committee, EAC Consulting, Inc. (EAC), with partners Rosales + Partners (R+P), and Savino and Miller Design Studio (SMDS) - in association with specialty sub-consultants - are pleased to submit our qualifications for the Professional Engineering and Architectural Services RFQ for the Pedestrian Bridge with Park Elements across A1A at 174th Street and Collins Avenue. We have assembled a project team with the required experience, expertise, and approach to successfully deliver this pedestrian bridge park project. Some of the unique qualifications of the EAC Team assembled for this project are: 1. EAC understands the requirements of the FDOT’s Local Agency Program (LAP) Manual as it relates to projects such as this - that involve a bridge structure crossing a roadway. We will comply with the FDOT’s latest revisions to the LAP Manual, the Florida Design Manual, FDOT Structures Manual and FDOT Standard Plans for these bridges. 2. EAC has included a peer review firm on our team that will review not only the design of the bridge, but also the construction sequence. 3. EAC has a proven reputation for providing notable bridge structures, including pedestrian bridges. In 2019, EAC successfully completed the design of the pedestrian bridges for the HardRock Stadium as part of a design build contract. 4. EAC’s commitment to public safety will result in a successful project. PROPOSED ENGINEERING AND ARCHTECTURAL SERVICES EAC is a FDOT certified firm with the capability to provide structural and transportation design services - including pedestrian bridge design, roadway design, maintenance of traffic, lighting design, permitting, and construction engineering inspections. EAC’s bridge certifications include major steel, concrete, and concrete segmental bridges - and EAC has assembled the premier bridge engineering team in Miami-Dade County. EAC built its reputation and business by providing design services for notable bridge structures, including pedestrian bridges. EAC has recent experience in pedestrian bridge design with the Hard Rock Stadium Pedestrian Bridges in the City of Miami Gardens. The EAC Project Team is familiar with Federal Highway Administration (FHWA) and FDOT Local Agency Program (LAP) requirements. In conjunction with FDOT District 6, our Project Team has experience with federally funded projects such as the Venetian Causeway Bridges Project Development and Environment (PD&E) Study, which is currently in its final stages. It will be our priority to perform all necessary due diligence to ensure that the objectives of the City of Sunny Isles Beach are attained. Leading our Project Team is K.T. Lin, PE, PhD, and structures department head. He is a registered Florida Professional Engineer with over 35 years in bridge structure design - including pedestrian bridges. EAC’s commitment to public safety will result in a successful project. EAC Consulting, Inc. eacconsult.com City of Sunny Isles Beach • RFQ 19-11-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. R+P will provide engineering and architecture services for the pedestrian bridge and elevator specifications. R+P has designed and completed over 30 award-winning pedestrian bridges across the USA, and has experience working with the FDOT. Many of these pedestrian bridges are icons of their communities - creating notable sculptural and technically innovative impacts while being well integrated in context. R+P has received national and international awards for bridge design, and have experience with many different types of structural systems and architectural approaches. Miguel Rosales, the owner and president of R+P, will be providing architectural services for this project. He is a registered Florida Architect and certified Master Gardener by the University of Florida. SMDS, a FDOT certified firm with an award-winning studio, is located in North Miami, and will be the Landscape Architect for this project. SMDS will play a key role as urban designer advising the team regarding the final layout and site planning of the pedestrian bridge/parkway. The SMDS office is located about six miles from the project site. Their projects in the City of Sunny Isles Beach include the City Hall Landscape Master Plan and Gateway Park. Over the last 25 years, SMDS has worked on several FDOT bridge and streetscape projects. These include the Brickell Avenue Median, Collins Avenue in Miami Beach, and the reconfiguration and beautification of the 41st Street bridges in Miami Beach over Indian Creek and Biscayne Waterway.SMDS has previously worked with EAC on many projects - most recently as Urban Designers and Landscape and Design Architects for the preparation on the PD&E Study for the Tamiami Canal Bridge. In this project, the task included the relocation and design of the Bridge Tender House, as well as bridge aesthetics. Manuel G. Vera & Associates Inc. (MGV), a Disadvantaged Business Enterprise (DBE) and prequalified under FDOT’s Work Groups 8.1, 8.2, and 8.4, will provide surveying services. MGV has been providing design survey and right-of-way mapping services to the Central and South Florida area for over 45 years, servicing Miami-Dade County, local cities, and FDOT Districts 4 and 6 for over 36 years, and the Florida Turnpike Enterprise for over 25 years. MGV’s past experience providing the same professional surveying and mapping services required for this signature bridge will ensure that this project is completed on schedule and within budget. Geosol, Inc. (GEOSOL), is a small professional firm that has been providing geotechnical services for over 20 years. GEOSOL is certified as a Small Business Enterprise (SBE) and Disadvantaged Business Enterprise (DBE) by FDOT, and qualified under FDOT’s Work Groups 9.1, 9.2, 9.4.1 and 9.4.2. The firm is based in Miami Lakes, within close proximity to the project location. The firm provides geotechnical engineering and testing services. In addition, GEOSOL has engineers who are CTQP certified in drilled shaft inspections. Mr. Oracio Riccobono, PE, has over 31 years of geotechnical experience, and is the lead Geotechnical Engineer of the firm. He is fully aware of the geotechnical conditions of the project site. Mr. Riccobono has been the Geotechnical Engineer of Record for many FDOT D6, MDX, Florida Turnpike Design Build and Miami-Dade Transit projects. Recently, he was the geotechnical Engineer-of-Record for the Hard Rock Stadium Pedestrian Bridges for the City of Miami Gardens. GEOSOL provides local knowledge of the area with national experience in pedestrian bridge design and award-winning projects across the United States. TLC Engineering Solutions (TLC) was founded in 1955 and consistently ranked among the largest Mechanical, Electrical and Plumbing (MEP) and structural engineering firms in the country. They are a highly qualified team of over 380 professionals - including professional engineers, LEED-accredited professionals, and ACG-registered commissioning authorities, coupled with specialists in acoustics, energy management, and technology. TLC will provide MEP Design Services. Smart-Sciences, Inc, a Woman Owned Business Enterprise (WBE) and DBE FDOT certified firm, provides expertise in environmental permitting, ecological consulting and environmental science. They provide innovative solutions that promote smart growth and human development in an environmentally sustainable manner. ASA Consultants, Inc. (ASA) is an FDOT certified firm that offers highway and structural engineering services. ASA specializes in all facets of highway and structural engineering, and will be performing peer review for this project. They are organized in distinct service niches - that include minor, major, and complex roadway design, miscellaneous structures and minor and major bridge design, conventional bridge inspection and bridge load rating, and signing, pavement marking, and channelization and qualified under FDOT Work Groups 3.1, 3.2, 3.3, 4.1.1, 4.1.2, 4.2.1, 4.2.2 , 4.2.3, 5.1, 5.4, and 7.1. ASA has worked exclusively in South Florida, primarily in FDOT Districts 4 and 6. In addition, ASA has served as staff augmentation for FDOT D4 for the past three years. EAC Consulting, Inc. eacconsult.com City of Sunny Isles Beach • RFQ 19-11-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. ASA consultants was involved in design and construction plans for the emergency pedestrian bridge over the Intracoastal waterway, locally known as Town Center Park Canal, between NE 174th St. and NE 172nd St., along North Bay Road, City of Sunny Isles Beach. This project was within a very tight right-of-way, and included replacement of existing sea walls on the north side of the canal. LARS engineering, Inc. (LARS), an FDOT certified firm for the past decade, has inspected over 1,500 Bridges in the State of Florida, including pedestrian bridges. LARS recently performed the initial inspection for the Pedestrian Bridge at Hard Rock Stadium, in the City of Miami Gardens. They are knowledgeable of the latest inspection and reporting techniques and procedures established by FHWA. LARS’ commitment includes reviewing all kinds of inspection reports of pedestrian bridges to determine the most common type of deficiencies found in the history of repairs. They bring an unmatchable mixture of experience and dedication to guarantee that the quality of work exceeds expectations. LARS’ key staff have completed several FHWA-NHI training classes, including safety Inspection of in-service Bridges. Choice Engineering Consultants, Inc. (Choice), is a DBE, SBE, Civil Engineering firm - specializing in Roadway and Traffic Engineering. Choice provides design solutions in Traffic Engineering and Operations Studies, Traffic Safety Analysis, Traffic Operations Design, and ADA compliance support and planning. Since its inception in 2015, Choice has been proudly selected to serve as FDOT’s Districtwide Signal Retiming Consultant for Miami-Dade and Monroe counties, and has served FDOT District 6 for the past five years. Janus Research is a Cultural Resources Management (CRM) firm that consistently provides the FDOT with high-quality cultural resource management services. They have a solid understanding of the challenges posed by federal laws, regulations, and guidelines, and know how to negotiate the complex process of State Historic Preservation Office (SHPO) and regulatory approval. They excel at developing creative mitigation strategies with little or no impact to construction schedules. They have long-standing relationships with the staff of the Florida Division of Historical Resources’ Compliance and Review Section, the Federal Highway Administration, the State Archaeologist, the SHPO, the Miccosukee Section 106 Representative, and the Seminole Tribal Historic Preservation Officer. PROJECT MANAGEMENT PLAN Our commitment to the City of Sunny Isles Beach is to meet all project milestones and produce a cost- effective quality product that avoids construction issues and minimizes future maintenance. We will utilize weekly team meetings that clearly convey the City’s expectations on scope, budget, schedule, and quality. The Project Manager, K.T. Lin, PE, PhD, and Assistant Project Manager, Stephanie Romero, PE, will run team meetings and coordinate communication with all project discipline leaders to ensure that expectations are met. Monthly progress meetings will be held with the City’s Project Manager and project stakeholders to ensure proper coordination of the project scope, schedule, and budget. Our approach includes risk assessment and a proactive approach to addressing issues, which will minimize the involvement of the City’s Project Manager, while keeping him informed of all project issues. EAC Consulting, Inc. eacconsult.com City of Sunny Isles Beach • RFQ 19-11-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. Project Schedule We will monitor our Project Schedule via schedule updates with monthly progress reports, which will include a 90-day look ahead analysis to identify critical path activities and opportunities to accelerate the design schedule. Project Budget The Project Budget will be monitored monthly to ensure that our invoices are based on progress and documented in our progress reports. Quality Assurance /Quality Control (QA/QC) A project-specific QA/QC plan will be submitted to the City’s Project Manager within ten days of the Notice to Proceed (NTP), and will follow FDOT procedures, utilize checklists, perform constructability reviews, incorporate lessons-learned, and will be used by the entire project team, including sub- consultants. FDOT Local Agency Program (LAP) Coordination EAC understands the requirements of the FDOT’s Local Agency Program (LAP) Manual as it relates to projects such as this - that involve a bridge structure crossing a roadway. We will comply with the FDOT’s latest revisions to the LAP Manual, the Florida Design Manual, FDOT Structures Manual and FDOT Standard Plans for these bridges As part of the EAC Project Team, Harold Desdunes, PE, and ex-Director of Transportation Development for FDOT’s District 6, will lead this coordination effort. He is extremely familiar will all FDOT requirements and procedures, and will ensure that the project team performs close coordination with FDOT’s Central Office. This will ensure our Project Team is following all FDOT design procedures and meeting all design requirements in order to protect the lives, health, and public safety. Qualified Independent Peer Review EAC has included a peer review firm on our team that will review not only the design of the bridge, but also the construction sequence. ASA Consultants have been included as part of the EAC Project Team to perform an independent peer review for the pedestrian bridge design plans. Adjacent Project Coordination The following FDOT projects have been identified in the area. The construction schedule duration is approximately 450 – 550 calendar days. We will coordinate these projects and other projects that may develop to minimize impacts to the traveling public. Project Milestones and Deliverables Our Project Team will focus on implementing all the tasks outlined below - utilizing an efficient, results-oriented approach that has worked on our prior professional service agreements contracts. We will design the project using FDOT Design Plans and Standards, Miami-Dade County Standards, City of Sunny Isles Beach codes, and Resolutions and Ordinances and State of Florida Building Codes - to best achieve the project goal of providing a safe pedestrian bridge park that accommodates the pedestrian, bicyclist, and traffic needs, while improving access to businesses and properties. The project milestones and deliverables are as follows: Task 1: Bridge Development and Planning Phase The first step to this project is to fully understand the needs of the City of Sunny Isles Beach and the community. Our Team will undertake master planning and public involvement, initiated upon Notice To Proceed (NTP), to coordinate the design approach and facilitate an effective public communications plan. The Project Bridge Development Planning phase will be completed in Item #Description Work Mix Construction FY Amount ($) 436525-1-52-01 SR 826/ SUNNY ISLES BLVD OVER INTRACOASTAL WTWYBASCULE BR 870592/0593 BRIDGE-REPAIR/ REHABILITATION 2021 8,443,973 436525-2-52-01 SR 826/ SUNNY ISLES BLVD FROM NE 35 AVENUE TO SR A1A/ COLLINS AVE RESURFACING 2021 2,130,726 EAC Consulting, Inc. eacconsult.com City of Sunny Isles Beach • RFQ 19-11-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. compliance with all applicable federal, state, and local laws, rules, and regulations. From the very beginning of the project, an open and collaborative planning process will enable the team to creatively work in partnership with the public and regional and local agencies to help identify and address the area’s needs and any potential complications and conflicts early in the design process. The Project Team will evaluate and propose viable design alternatives for the proposed pedestrian bridge concept. Task 2: Design Development and 30% Plans An integrated approach of engineering and architectural concepts will ensure that overall, the project will successfully balance the function of the proposed pedestrian bridge park and the area needs of the community. Based on the selection of a Preferred Alternative, the Project Team will develop a preliminary project design that will provide safe pedestrian and bicycle access over Collins Avenue at 174th Street. In this task the EAC Project Team will submit a complete set of 30% plans to the City of Sunny Isles Beach staff for review and comment. The 30% submittal will include: •30% Design Calculations •30% Design Plans - that include the Bridge Park Layout and Geometry •30% Technical Specifications •30% Estimate of Probable Cost •30% Construction Schedule The EAC Project Team will meet with the City of Sunny Isles Beach staff and discuss the 30% submittal review comments for further design development to be incorporated in the 60% design phase. Task 3: Design Development and 60% Plans Based on the 30% review comments and direction from the City of Sunny Isles Beach, the EAC Project Team will further develop the project design. In this task the EAC Project Team will prepare a 60% submittal that includes: •60% Design Calculations •60% Design Plans - that include all bridge design detailing including proposed bridge foundations and park landscaping details •60% Refined Technical Specifications •60% Refined Estimate of Probable Cost •60% Refined Construction Schedule The EAC Project Team will meet with the City of Sunny Isles Beach staff and discuss the 60% review comments for further design development to be incorporated in 100% design phase. Task 4: Design Development and 100% Plans Based on the 60% review comments and direction from the City of Sunny Isles Beach, the EAC Project Team will finalize the project design. In this phase, the EAC Project Team will prepare a 100% submittal that includes: •100% Design Calculations •100% Design Plans •100% Technical Specifications •100% Estimate of Probable Cost •100% Construction Schedule Afterward, the Project Team will meet with the City of Sunny Isles Beach staff and discuss the 100% review comments for final construction plans. Task 5: Permitting Phase The EAC Project Team will prepare all necessary permit application packages to be provided to all applicable and regulating agencies. The EAC Project Team will also meet with the City of Sunny Isles Beach and address any comments needed to obtain approvals from the reviewing agencies. The City of Sunny Isles Beach will be responsible for all permit application fees. Task 6: 100% Construction Plans and Bidding Documents The EAC Project Team will finalize all construction plans and issue signed and sealed plan sets for the City of Sunny Isles Beach records. The EAC Project Team will assist the City of Sunny Isles Beach in preparing close-out bidding documents. The following close-out bidding documents will be provided: •Bid Tabs for Contractor bid tabulation •Approved 100% Technical Specifications •Approved 100% Signed and Sealed plans •Approved 100% Design Calculations Task 7: Construction Management Services The EAC Project Team will assist the City of Sunny Isles Beach with Construction Management Services upon request. EAC Consulting, Inc. eacconsult.com City of Sunny Isles Beach • RFQ 19-11-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. PROJECT SCOPE AND METHOD OF APPROACH Our Project Team is ready to refine and complete the 174th Street and Collins Avenue Bridge Park selected design concept. We have sensibly studied the Sunny Isles Pedestrian Overpass Planning Study and the 2016 Transportation Master Plan to fully understand the project scope. The project is in one of the most heavily traveled intersections by pedestrians and vehicles within the City of Sunny Isles Beach, and the concept design will be an open and elevated bridge park over the south side of the intersection, traveling east and west, to accommodate for vehicular improvements at the surface level and to take the pedestrians to an elevated plane for an enhanced crossing experience reflected as an extension of the Samson Oceanfront Park. Our Project Team provides a fresh approach in order to identify potential refinements to the concept design; our experience on pedestrian bridges allows project familiarity that will improve the concept design and maximize efficiency and cost effectiveness. Our portfolio of pedestrian bridge projects is indicative of our familiarity with infrastructure works within pedestrian bridge facilities locally and nationally. The EAC Project Team brings an in-depth understanding of the needs associated with this project. The scope of work includes the design of a pedestrian link that will become an extension of the adjacent Samson Oceanfront Park, creating a “destination experience.” The new link will be green and sustainable and will incorporate the use of native plants to create a buffer for pedestrians crossing Collins Avenue. It will be designed as a plaza, with landscaping, creating an elevated park. The connection will be fully American with Disabilities Act (ADA) accessible with stairs and elevators, that will be provided on the east and west approaches. It is our mission to design a pedestrian green crossing that is visually attractive, structurally efficient and cost effective. Proposed Bridge Structure The proposed bridge will have a main span of 165 feet with a cantilevered span providing seating for pedestrians. Bridge width will vary from 49 feet to 61 feet, with a minimum vertical clearance of 21 feet. Florida-U Beams (72 inch) can be utilized to support the pedestrian loads and dead loads including soils, plants, glass walls and glass railings, and miscellaneous items. The U-beams will be precast and erected at night with no traffic under the beams - for public safety and ease of erection. The beams will be securely connected to the supporting piers to ensure stability of the structure immediately after erection. To minimize impact to local traffic, precast decks can be used, integrating with the U-beams, for an integral bridge structure. Both and bridge layout and pier structures will have the architectural and park features desired by the city. Foundation systems like Auger Cast In Place (ACIP) piles, driven piles, and drilled shafts can be considered. Driven piles will create vibration and noise and have impact to the local activities. ACIP piles and drilled shafts will eliminate these concerns. Drilled shafts also have the least footprint, which may be critical to minimize impact to local traffic during construction. In the preliminary EAC Consulting, Inc. eacconsult.com City of Sunny Isles Beach • RFQ 19-11-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. design phase, we will evaluate different structural systems for both the superstructure and substructure, along with the park themes and architectural features in close coordination with the City. Final design will be performed per the selected alternate by the City. The bridge typical section will include both landscaping and pedestrian zones separated by glass railings. The minimum width that we recommend for the pedestrian walkway zones are 12 feet but with additional space to add landscaping and seating and other amenities. We can also integrate pergolas to provide shade upon the City’s request. The elevated bridge park will include benches, planters, steps and ramps, bicycle racks, trash and recycle receptacles, railings, and aesthetic lighting. Foundations The EAC Project Team has reviewed all data available from various sources to determine the geotechnical approach and understanding. The presence of the variable subsurface conditions - coupled with a residential setting, high traffic volume and noise sensitive site - makes foundation design and construction extremely challenging for this project. Our approach considered all lessons-learned and our knowledge from recently constructed foundation construction projects. All required geotechnical services will be performed in accordance with FDOT’s current Soils and Foundation Handbook (2020) and specifications. Borings and rock coring will be required at each foundation location to confirm our advanced knowledge of subsurface conditions in the project area, specifically one SPT boring per pier/bent to obtain more comprehensive geotechnical information and to reduce risks of schedule and pile or drilled shaft overruns. The Project Team performed a preliminary evaluation of shallow and deep (driven piles and drilled shafts) foundation options. However, given the unfavorable near-surface subsurface conditions, spread footings are not feasible, and would result in very large dimensions - due to the relatively low soil bearing capacity and predicted excessive settlements of the underlying loose to very loose sandy soils. Drilled shafts are a feasible foundation system, and its construction uses relatively low vibration equipment; hence friendly to the surrounding environment and resulting in a smaller foundation footprint and less MOT requirements. The EAC Project Team will also explore the use of 24 inch diameter ACIP pile foundations for the bridge. The use of ACIP piles eliminates the risks of causing vibration-related damages - associated with pile driving during foundation construction - to existing structures. Most recently, FDOT has allowed the use of ACIP pile foundations for bridge structures; however, FDOT is presently in the process of preparing developmental specifications for the use of ACIP pile foundations for an on-going and upcoming vehicular bridge project in District 4. GEOSOL has gotten approval from the FDOT’s Central Office to use ACIP piles for the proposed pedestrian bridge connecting the existing Tri-Rail Station Pedestrian Bridge to the new parking structure at the Golden Glades Multimodal Transportation Facility. GEOSOL is also working as part of the FDOT Review Team for the I-395 project, and working with FDOT’s Central Office in the implementation of ACIP piles for support of segmental bridges and signature bridges. For the elevators and stairs, the EAC Project Team will use ACIP. ACIP piles have been successfully used on numerous transportation infrastructure projects in Miami-Dade County - including the City of Miami Beach West Avenue vehicular bridge over the Collins Canal, Miami-Dade Transit elevated guideway bridges, Miami International Airport (MIA) parking garages, MIA transportation hub, MIA vehicular bridges, and a 200-foot high air traffic control tower at the Miami-Opa-Locka Executive Airport. Also, in the private sector, Auger cast piles are commonly used in South Florida to support heavily loaded structures - such as high-rise condominium towers, hotels, and arenas. Pedestrian Bridge Railings One of the major objectives for this project is to avoid the use of a fence or cage over Collins Avenue - which is common in many pedestrian bridges in Florida. We will propose to use landscaping and a buffered area so that pedestrians are not walking adjacent to the roadways below. This will allow for a more natural and open bridge design. The proposed conceptual glass railings are a maintenance concern due to the salt derived from the proximity to the beach. During the preliminary design phase we will consider this alternative, however, we will also propose consideration of stainless-steel flexible mesh - which can be very transparent and would not require the cleaning and maintenance associated with glass. Elevators The proposed elevators will be designed and positioned in strategic locations that will not impact pedestrian circulation near and under the new pedestrian bridge. We will recommend the use of high resistant materials to minimize maintenance in the future. We have recently designed several pedestrian bridges with elevators and are acquainted with all the features required to extend longevity and reduce life cycle costs. Aesthetic Bridge Lighting The aesthetic lighting will enhance the appearance of the pedestrian bridge at night, and will provide a safer and more comfortable crossing. We will propose the use of low EAC Consulting, Inc. eacconsult.com City of Sunny Isles Beach • RFQ 19-11-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. maintenance Light Emitting Diode (LED) lighting that is well integrated with the architecture of the bridge. The use of lighting fixtures that change colors for special events could be added to the project at minimal cost. We will provide indirect lighting and conceal the location of conduits and electrical connections. We will also provide cut-off luminaries to not impact the adjacent residential buildings surrounding the crossing and follow Florida Fish and Wildlife Conservation Commission (FWC) guidelines for the use of turtle-friendly fixtures. Landscape Architecture & Urban Design A key issue in the proposed bridge parkway will be the design of planting and pedestrian-friendly spaces, possibly even incorporating seating and viewing areas. SMDS has significant experience in planting over structural decks, the most relevant being the Aventura Optima ‘Green Roof’ designed over a parking Garage, the second LEED Platinum Building in South Florida, recipient of awards from Florida ASLA and nationally from the Green Roof for Healthy Cities Organization. SMDS will work in close collaboration with the Bridge Engineers, Bridge Architect, and Project Team to define the design guidelines and requirements for the landscape architecture on the bridge, and lend their expertise to help the City to achieve their project goals, which include: 1. Iconic & Emblematic The bridge design will take advantage of its proposed location over Collins Avenue to connect with the Samson Oceanfront Park. This pedestrian bridge has the potential to become an iconic architectural element for the City of Sunny Isles Beach, as well as critical infrastructure to make moving through the City safer, easier, and more pleasant for pedestrians. The shape and materials used will be key in designing a bridge that is both emblematic and structurally sound. Coordination between the engineering and architectural team will be essential at this stage in the design process. 2. Be a Destination and Experience The bridge should be a destination in and of itself. The experience of moving up, across and down the bridge should feel natural. There are several ways to do this, and some options to be evaluated for this project include: elevators, progressive ramp-ways, commercial opportunities, recreational program, passive park-like setting, ways to create a natural connection to the park, etc. The general idea is to create special uses or experiences to the bridge in addition to its functional quality. 3. Bridge to have a “Park” character One potential bridge design concept will be to balance the loss of green space caused by Collins Avenue by “raising” the landscape above the street, essentially creating a Park Bridge Oasis. This concept not only provides stormwater management benefits, but invites people to enjoy the space, activating it with special uses that complement the existing park. It will also create panoramic views over the park, ocean and city beyond. 4. Complement and harmonize with Samson Oceanfront Park We envision the design of the bridge as an extension of the park, creating a greenway link to the west side of the City. Our Project Team will design the bridge to add to Samson Oceanfront Park. The planting palette will be comprised of coastal, native hammock and dune species. Emphasis will be on coastal, salt resistant, and wind resistant plants to comprise the planting palette. This bridge design will require structural, architectural, urban design, and landscape architectural services to seamlessly integrate it within the City’s mobility network as well as its open spaces. SMDS will be involved from the beginning of the programming and schematic design process to define planting areas, pedestrian paths and passive areas in order to delineate a clear approach to irrigation, depth of planting areas, types of soils, and types of planting. SMDS will also contribute to the urban design and layout of the bridge, in coordination with the bridge architect, structural engineer, and all other consultants. Integration of Landscape, Architectural and Structural features It is important that landscape and green elements on the bridge be well integrated to create a seamless experience crossing the bridge. We will design a bridge superstructure that easily accommodates landscaping and possibly a tree canopy to provide shade at the crossing. Our Project Team has experience with similar projects across the USA including a new parkway being built in Manhattan in the East River - which also includes a pedestrian bridge connecting the neighborhood to the floating parkway. EAC Consulting, Inc. eacconsult.com City of Sunny Isles Beach • RFQ 19-11-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. Environmental Approach The environmental approach for the project will center on identification of protected resources and potential contamination issues for consideration in the construction of the Pedestrian Overpass located at the Collins Avenue (A1A) and 174th Street intersection. This concept design recommends an open and elevated bridge park over the south side of the intersection, traversing east and west, to accommodate for vehicular improvements at the surface level and to bring the pedestrian to an elevated plane for an enhanced crossing experience reflected as an extension of the Samson Oceanfront Park. Smart-Sciences will identify protected resources and potential contamination issues, and will work with the design team to minimize and avoid impacts to the greatest extent practicable. Smart-Sciences conducted preliminary research for the study area. Based on GIS and ETDM review, Smart-Sciences has identified the following environmental considerations and their potential effects: Contamination: Few potential hazardous materials sites were identified within the vicinity of the proposed pedestrian bridge - including FDEP storage tank contamination monitoring sites and petroleum contamination monitoring sites. Potential Effects: A Contamination Screening Evaluation Report will be prepared. This will be important for dewatering, areas of earthwork, and placement of exfiltration trench. Wetlands/Surface Waters: No wetlands or surface waters are present at the landing areas of the proposed pedestrian bridge or along the corridor. No wetland permitting with the County, State or USACE is required. Potential Effects: None Wildlife and Habitat: The proposed pedestrian bridge lies within the US Fish and Wildlife Service consultation areas of the American Crocodile, Florida bonneted bat, piping plover and the manatee. Several trees are located in the landing areas of the proposed pedestrian bridge. Potential Effects: A Listed Species Technical Memorandum will be prepared. If endangered or threatened species involvement is identified, a biological assessment for formal consultation will be prepared. There are numerous street trees and structures within the proposed project location that could be suitable for roosting by the Florida bonneted bat. A roosting or acoustical survey may be required. There is no in-water work proposed, therefore, there are no anticipated impacts to manatees and American crocodiles. There is also no work proposed in habitat for the piping plover, therefore no anticipated impacts are expected. Trees: If trees are proposed for removal or relocation a tree removal permit will be required from Miami-Dade County. Cultural Resource Assessment Janus Research prepared a cultural resources desktop analysis and field review in December of 2019; it is currently under review by the State Historic Preservation Officer. As part of this documentation two historic resources were identified, a portion of Collins Avenue and a building at 18080 Collins Avenue, both are considered ineligible for inclusion in the National Register. No archaeological resources were identified. As part of this most recent RFP, Janus Research would evaluate the latest project improvements to determine if additional resources will need to be documented in compliance with state and federal regulations. Roadway Safety The Project Team will comply with all safety vertical and horizontal clearances and setback requirements while also designing a pedestrian bridge that will fit well in the context and become an attractive link between the neighborhood and the beach. We will propose a construction sequence that minimizes impacts to the busy roadway below. Maintenance of Traffic Given the high volume of vehicles and pedestrians using Collins Avenue, safety of the traveling public and construction workers are paramount for this project. Not only must a safe work zone be guaranteed, but the public must confidently perceive it as such. The EAC Project Team will prepare a construction phasing and Maintenance of Traffic (MOT) sequence that makes safety considerations front-and-center. It is expected that the construction of the towers and pedestrian ramps on both sides of Collins Avenue can be constructed without impacting vehicular traffic. Appropriate measures to detour pedestrian traffic will be provided should sidewalks and paths in the park require closure. Construction of the towers will be performed one at a time in order to keep one side of Collins Avenue unimpeded at all times, allowing for continuous pedestrian movement. Vehicles may not use Collins Avenue during the erection of the bridge structure which will warrant closure of the roadway. It is estimated that the erection of the bridge, ensuring proper bracing of all elements and confirming it is safely in place may take up to three days. Detours for vehicles will be provided during this time. Advance notification of this closure will be communicated to the EAC Consulting, Inc. eacconsult.com City of Sunny Isles Beach • RFQ 19-11-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. local community well in advance of the actual closure and adequately communicated with temporary signs and digital message boards during the closure. The EAC Project Team will work closely with the City and the community to solicit feedback in order to develop a MOT plan that takes the needs and concerns of all parties into consideration. Bridge Inspection The Project Team’s priority is to preserve public safety at all times. The lead Inspectors (all MOT certified) will establish traffic control procedures in accordance with FHWA/USDOT MUTCD, and FDOT Standard Plans Index 102, minimizing traffic disruptions and creating a safer work zone. Proper coordination will be arranged with bridge owners for access and lane closures, if required. LARS will provide bridge inspection services. Surveying and Mapping and Subsurface Utility Engineering Services (SUE) For this signature project with the City, the necessary survey elements required for the successful design of the pedestrian bridge will include baseline of survey and right-of-way establishment, DTM/Topographic survey, drainage survey, etc. Survey information will be gathered via a combination of conventional EFB data collection and LiDAR imagery. Utilizing static LiDAR will allow the team to gather a complete detailed topographic survey with one field mobilization, and allow the team to pull additional detailed information throughout the design process (wire heights, mast arm details, renderings for public involvement meetings, etc.) without having to remobilize, thus saving design dollars, which can be utilized by the City elsewhere. In addition to the design survey, Subsurface Utility Engineering (SUE) will be required. In order to accurately locate the existing utilities within the project area, MG Vera will follow the ASCE 38-02 “Standards Guideline for the Collection and Depiction of Existing Subsurface Utility Data.” MGV will provide Quality Level B Utility Designates to horizontally map these utilities and Quality Level A locates (test holes – vertical/horizontal – Optional Services) as required for utility conflict resolution/avoidance. INNOVATIVE CONCEPTS Below are some alternative that our Project Team would explore during the design development: •ADA Compliant Ramps - The use of gracious ADA compliant ramps instead of one or two of the proposed elevators. This new concept will minimize the maintenance required for elevators in public area and reduce the life cycle cost for the structure. Eliminating the elevators will also improve safety for pedestrians during late dark hours and the possibility of bad odors in the structures. R+P has designed several pedestrian bridges with curvilinear and elegant ramps that work seamlessly with the overall crossing such as the Appleton Pedestrian Bridge. For this recently completed project a combination of smooth ramps and gracious stairs were used to comply with the accessibility requirements while also improving the aesthetics of the area. EAC Consulting, Inc. eacconsult.com City of Sunny Isles Beach • RFQ 19-11-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. •New Railing Alternatives - During the design development we will work with the City to propose the use of a stainless-steel flexible mesh or similar railing material alternatives which can be very transparent and will not require major cleaning and maintenance costs. This will eliminate the possibility of graffiti vandalism and salt spray from the beach location that can provide a cloudy appearance. •Native Plants – The EAC Project Team will propose 100% native plants that are hardy and sustainable and will not need as much maintenance, irrigation and fertilizers. This alternative will also beautify the location by attracting butterflies and other pollinators. •Improved Bridge Structure – The EAC Project Team will evaluate a geometrically lighter bridge. The current proposed structure can appear lighter and be aligned perpendicular to Collins Avenue. It will feel less aggressive towards incoming vehicular circulation while improving bridge aesthetics and constructability. The proposed structural system can also hold plantings that can hold a water collection system to use for irrigation. •Lighting – The EAC Project Team will evaluate the use of LED or solar lighting in a way that is iconic and turtle friendly. EVALUATION CRITERIA SUMMARY To facilitate the review of our qualifications package, we have prepared a summary to highlight our team’s unique qualifications in accordance with the City of Sunny Isles Evaluation Criteria. We are confident that our team will exceed the City’s expectations. EVALUATION CRITERIA CRITERIA MET Professional Qualifications, the respondent shall be licensed to do business in the State of Florida. Specific project experience relating to bridges, and experience with FDOT. The EAC Project Team is licensed to do business in the State of Florida. Specific project experience including FDOT projects have been included as part of our qualifications package. Our team has previous working relationships with each other and with the FDOT. Most importantly we have the expertise and proven performance providing the services required on this project to the FDOT and other agencies. EAC is FDOT certified to provide Minor to Major Bridge Design in steel, concrete or segmental concrete and we have successfully provided these services to the FDOT. Size of workforce, workload and availability of personnel EAC has an average workload and an overall staff of 97 professionals (which includes 30 PE’s, 8 EI’s and 16 CEI personnel). We have proposed key staff resources that are 100% available for this project. The resources at EAC are more than sufficient to exceed the performance requirements for this contract. Financial stability and past record We have included our financials that clearly demonstrate our stability as part of the qualifications package. Ability to complete project within proposed schedule and within budget The firms on the EAC Project Team have been carefully selected to ensure that they can align themselves with EAC’s goal – to provide engineering excellence and exceptional client services while delivering the project within schedule and budget. The staff leading the team are talented professionals with the experience to get the job done. Quality, Sensitivity to Schedule and Attention to Budget will be the mindset of our Project Team. Is firm or sub-consultant a certified minority business enterprise? EAC is a State of Florida certified Minority Business Enterprise (MBE). We have also included as part of our team Women Business Enterprises (WBE) and Disadvantaged Business Enterprises (DBE). References The EAC Project Team consists of sub consultant firms who collectively have been working with FDOT for many years. EAC and our sub consultants have built strong relationships based on quality performances. Our qualifications package includes client references that can attest to each firm’s superior performance. E QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL E.QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL EAC Consulting, Inc. eacconsult.com City of Sunny Isles Beach • RFQ 19-11-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. FINANCIAL STABILITY Financial stability (Include three years audited or reviewed financial statements, prepared by a C.P.A.) Refer to Tab E “Attachments” Per Florida Statutes Section 119.071(1)(c) financial statements constitute confidential information and are exempt from public disclosure. ARCHITECT - ENGINEER QUALIFICATIONS PART I - CONTRACT-SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1. TITLE AND LOCATION (City and State) Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across AIA at 174th Street 4. NAME AND TITLE B. ARCHITECT-ENGINEER POINT OF CONTACT K.T. Lin, PhD, PE, Project Manager 5. NAME OF FIRM EAC Consulting, Inc. 6. TELEPHONE NUMBER 305-265-5400 7. FAX NUMBER 8. E-MAIL ADDRESS klin@eacconsult.com C.PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors.) (Check) 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT PRIME J-V PARTNERSUBCON- TRACTORa. ✔ EAC Consulting, Inc. CHECK IF BRANCH OFFICE 5959 Blue Lagoon Drive, Suite 410 Miami, FL 33126 Prime-Highway Design Roadway, Highway Design Bridges, Lighting b. ✔ Savino and Miller Design Studio CHECK IF BRANCH OFFICE 12345 NE 6th Avenue North Miami, FL 33161 Landscape c. ✔ Rosales + Partners, Inc. CHECK IF BRANCH OFFICE 10 Derne Street Boston, MA 02114 Architectural d. ✔ ASA Consultants, Inc. CHECK IF BRANCH OFFICE 510 Shotgun Road, Suite 402 Sunrise, FL 33326 Structural Engineering e. ✔ LARS Engineering, Inc. CHECK IF BRANCH OFFICE 7225 NW 25 Street, Suite 211 Miami, FL 33122 Bridge Inspection f. ✔ CHECK IF BRANCH OFFICE 12855 SW 132nd Street, Suite 200 Miami, FL 33186 Traffic Engineering & Operations Studies/Design D.ORGANIZATIONAL CHART OF PROPOSED TEAM AUTHORIZED FOR LOCAL REPRODUCTION (Attached) STANDARD FORM 330 (REV. 8/2016) 2. PUBLIC NOTICE DATE 11/20/2019 3. SOLICITATION OR PROJECT NUMBER 19-11-01   Choice Engineering Consultants, Inc. ARCHITECT - ENGINEER QUALIFICATIONS PART I - CONTRACT-SPECIFIC QUALIFICATIONS A.CONTRACT INFORMATION 1. TITLE AND LOCATION (City and State) Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across AIA at 174th Street 4. NAME AND TITLE B.ARCHITECT-ENGINEER POINT OF CONTACT K.T. Lin, PhD, PE, Project Manager 5. NAME OF FIRM EAC Consulting, Inc. 6. TELEPHONE NUMBER 305-265-5400 7. FAX NUMBER 8. E-MAIL ADDRESS klin@eacconsult.com C.PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors.) (Check) 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT PRIME J-V PARTNERSUBCON- TRACTORa. ✔ Manny G Vera & Associates, Inc. CHECK IF BRANCH OFFICE 13960 SW 47th Street, Miami, FL 33175 Surveying b. ✔ GEOSOL, Inc. CHECK IF BRANCH OFFICE 5795-A NW 151st Street, Miami Lakes, FL 33014 Soils, Foundations & Materials Testing c. ✔ Smart-Sciences CHECK IF BRANCH OFFICE 330 SW 27th Avenue Suite 504 Miami, FL 33135 Environmental d. ✔ JANUS RESEARCH CHECK IF BRANCH OFFICE 1107 N. Ward Street Tampa, Florida 33607 Cultural Resources e. ✔ TLC Engineering Solutions CHECK IF BRANCH OFFICE 5757 Blue Lagoon, Suite 400 Miami, Florida 33126 MEP Services f. CHECK IF BRANCH OFFICE D.ORGANIZATIONAL CHART OF PROPOSED TEAM AUTHORIZED FOR LOCAL REPRODUCTION (Attached) STANDARD FORM 330 (REV. 8/2016) 2. PUBLIC NOTICE DATE 11/20/2019 3. SOLICITATION OR PROJECT NUMBER 19-11-01  (CONTINUED)  CITY OF SUNNY ISLES BEACH • RFQ 19-11-01 • PROFESSIONAL ENGINEERING AND ARCHITECTURAL SERVICES FOR PEDESTRIAN BRIDGE WITH PARK ELEMENTS ACROSS A1A AT 174TH ST. PRINCIPAL-IN-CHARGE Harold Desdunes, PE EAC PROJECT MANAGER K.T.Lin, PE, PhD EAC PLANNING Stephanie Romero, PE EAC David Gilpin-Hudson, AICP EAC Adriana Savino, AIA SMDS Barry Miller, ASLA SMDS CIVIL ENGINEERING DESIGN Huntley Higgins, PE, PMP EAC Evelyn Rodriguez, PE, ENV SP EAC Miguel Lockward, PE, ENV SP EAC ROADWAY/MOT PRIMARY WORK AREAS/DISCIPLINES/SERVICES Satiar Shirazi, PE EAC Rodney Devera, PE EAC The EAC Team EAC Consulting, Inc. EAC Prime Consultant Savino & Miller Design Studio SMDS Rosales + Partners, Inc. R+P ASA Consultants, Inc. ASA LARS Engineering, Inc. LEI Choice Engineering Consultants, Inc. CEC Manny G Vera & Associates, Inc. MGV GEOSOL, Inc. GEO Smart-Sciences, Inc. SSI Janus Research JR TLC Engineering Solutions TLC BRIDGES/STRUCTURES Soheila Sadough, PE ASA Carlos Rodriguez, PE ASA QUALITY CONTROL TEAM BRIDGES/STRUCTURES Enrique “Rick” Crooks, PE EAC ARCHITECTURE Nicholas De Rycker, PE R+P CIVIL/ROADWAY Michael Adeife, PE EAC SECONDARY SUPPORT SERVICES MEP ENGINEERING ELECTRICAL ENGINEERING Ralph Baeza, PE TLC Manuel Mollinedo, PE TLC MECHANICAL/PLUMBING ENGINEERING Vincent McNish, PE TLC ELEVATOR SPECIFICATIONS Miguel Rosales, AIA R+P SURVEYING | MAPPING | SUE Manuel G. Vera, Jr., PSM MGV Mark R. Sowers, PSM MGV GEOTECHNICAL ENGINEERING LIGHTING Oracio Riccobono, PE GEO Adnan Ismail, PE GEO Ramon Borges, PE EAC Girish Thallapragada, PE EAC Richard Lopez EAC Jeff Plusen, RLA, ASLA R+P CONSTRUCTION ENGINEERING INSPECTIONS (CEI) Sergio Besu EAC Jeff LaBelle EAC ENVIRONMENTAL ENGINEERING AND IRRIGATION DESIGN Gisele Colbert, MS, LEP SSI Meike de Vringer, MS SSI DEPUTY PROJECT MANAGER Stephanie Romero, PE EAC BRIDGES/STRUCTURES Abid Hadrous, PE EAC Chun Li, PE EAC Ning Wang, PE EAC Mohammad Fesharaki, EI EAC ARCHITECTURE BRIDGE Miguel Rosales, AIA R+P Marcin Kasiak R+P John Corey R+P LANDSCAPE Barry Miller, ASLA SMDS BRIDGE INSPECTION Adrian Leon LEI Randy Suarez LEI DRAINAGE Darren Dyer, PE EAC CULTURAL RESOURCES Kenneth Hardin JR Kathleen Hoffman JR Amy Streelman JR TRAFFIC ENGINEERING & OPERATIONS Carlos Francis, PE, PTOE CEC Eugenio Lopez, PE CEC 19.RELEVANT PROJECTS a. (1)TITLE AND LOCATION (City and State)Port of Miami Tunnel (Miami, FL) YEARS COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION 2014 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Responsibilities included coordination and management of staff and consultants on State and federally fAunded project designs for state roadways and bridges in Miami-Dade and Monroe Counties. Our office developed planning and project development and environmental studies to final contract plans for construction implementation. In addition, responsible for management of the traffic engineering, estimates, drainage, survey, R/W mapping, utilities, specification, quality assurance, structures, records and reproduction sections. Responsible for the district consultant staff hour negotiations committee and member of the supplemental agreement committee. Negotiated all professional services contracts for the Transportation Development Division worth more than $50,000. Responsible for coordination with local governments, FHWA and the public to ensure transportation projects comply with stakeholders. b. (1)TITLE AND LOCATION (City and State)SR 826/SR 836 Interchange (Miami, FL) YEARS COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION 2016 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firmResponsibilities included coordination and management of staff and consultants on State and federally funded project designs for state roadways and bridges in Miami-Dade and Monroe Counties. Our office developed planning and project development and eAnvironmental studies to final contract plans for construction implementation. In addition, responsible for management of the traffic engineering, estimates, drainage, survey, R/W mapping, utilities, specification, quality assurance, structures, records and reproduction sections. Responsible for the district consultant staff hour negotiations committee and member of the supplemental agreement committee. Negotiated all professional services contracts for the Transportation Development Division worth more than $50,000. Responsible for coordination with local governments, FHWA and the public to ensure transportation projects comply with stakeholders. c. (1)TITLE AND LOCATION (City and State)Tamiami Trail (Miami-Dade, FL) YEARS COMPLETED PROFESSIONAL SERVICES 2008 CONSTRUCTION 2013 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Responsibilities included coordination and management of staff and consultants on State and federally funded project designs for state roadways and bridges in Miami-Dade and Monroe Counties. Our office developed planniAng and project development and environmental studies to final contract plans for construction implementation. In addition, responsible for management of the traffic engineering, estimates, drainage, survey, R/W mapping, utilities, specification, quality assurance, structures, records and reproduction sections. Responsible for the district consultant staff hour negotiations committee and member of the supplemental agreement committee. Negotiated all professional services contracts for the Transportation Development Division worth more than $50,000. Responsible for coordination with local governments, FHWA and the public to ensure transportation projects comply with stakeholders. d. (1) TITLE AND LOCATION (City and State)Okeechobee Depressed Section (Hialeah, FL) YEARS COMPLETED PROFESSIONAL SERVICES 2004 CONSTRUCTION 2006 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Responsibilities included coordination and management of staff and consultants on State and federally funded project designs for state roadways and bridges in Miami-Dade and Monroe Counties. Our office developed planning and project development and environmental studies to final contract plans for construction implementation. In addition, responsible for management of the traffic engineering, estimates, drainage, survey, R/W mapping, utilities, specification, quality assurance, structures, records and reproduction sections. Responsible for the district consultant staff hour negotiations committee and member of the supplemental agreement committee. Negotiated all professional services contracts for the Transportation Development Division worth more than $50,000. Responsible for coordination with local governments, FHWA and the public to ensure transportation projects comply with stakeholders. e. (1)TITLE AND LOCATION (City and State)South Dixie Highway Reconstruction (Miami-Dade, FL) YEARS COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION 2013 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Responsibilities included coordination and management of staff and consultants on State and federally funded project designs for state roadways and bridges in Miami-Dade and Monroe Counties. Our office developed planning and project development and environmental studies 2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME:Harold Desdunes, PE 13.ROLE IN THIS CONTRACT:Principal-in-Charge 14.YEARS EXPERIENCE a.TOTAL: 33 b.WITH CURRENT FIRM: less than 1 15.FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 16.EDUCATION (Degree and Specialization): BS Civil Engineering, University of Miami 17.CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer: Florida – 43916 18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): to final contract plans for construction implementation. In addition, responsible for management of the traffic engineering, estimates, drainage, survey, R/W mapping, utilities, specification, quality assurance, structures, records and reproduction sections. Responsible for the district consultant staff hour negotiations committee and member of the supplemental agreement committee. Negotiated all professional services contracts for the Transportation Development Division worth more than $50,000. Responsible for coordination with local governments, FHWA and the public to ensure transportation projects comply with stakeholders. 2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME: Kuo Ting (K.T.) Lin, P.E., Ph.D. 13. ROLE IN THIS CONTRACT: Project Manager 14. YEARS EXPERIENCE a. TOTAL: 33 b. WITH CURRENT FIRM: 13 15. FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 16. EDUCATION (Degree and Specialization): 1987 PhD Civil Engineering - University of Miami 1984 MSCE - University of Miami 1980 Bachelor of Science in Civil Engineering, National Taiwan University 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer: Florida – 41089 Professional Engineer: California – 49346 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Hard Rock Stadium Pedestrian Bridges Design YEARS COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION 2020 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm EAC provided design services for the two pedestrian bridges substructures and for the MSE wall control drawings for the ramps at both bridge approaches. With a very aggressive schedule on this job, EAC was able to meet all of the design submittals deadlines. EAC is currently providing Post-Design services for the bridges and MSE walls related items. b. (1) TITLE AND LOCATION (City and State) Golden Glades Multimodal Transportation Facility YEARS COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION N/A (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Structures Lead for the Golden Glades Multimodal Transportation Facility (GGMTF), a design-build project for FDOT District-6, is currently under design and construction. The project is located in the southwest quadrant of the Golden Glades Interchange in northern Miami-Dade County and consists of two FDOT-owned Park and Ride (PNR) lots bordered by the South Florida Rail Corridor (SFRC) to the north, SR 9A (I-95) to the east, and NW 159th Street/Block to the south. The new integrated Multimodal Transportation Facility is intended to address the existing deficiencies in multimodal connectivity, capacity and transfer efficiency, comfort and convenience, as well as safety and security. The project also intends to upgrade the overall aesthetics of the facility and increase visibility from the neighboring roadways to serve as a gateway to Miami-Dade County. The proposed work includes the demolition of existing structures, design and construction of an at grade parking and a multi-story parking garage structure to support the new adjacent DTPW transit terminal, as well as a new elevated pedestrian bridge that connects the proposed parking garage structure to the existing Tri-Rail Bridge. c. (1) TITLE AND LOCATION (City and State) Downtown Government Center Station (All Aboard Florida) YEARS COMPLETED PROFESSIONAL SERVICES 2015- 2019 CONSTRUCTION 2019 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm EAC provided structural design services for the Miami Central Station Rail Infrastructure and Rail Viaduct, and also provided post-design support. The viaduct is an elevated guideway structure, built 50 feet above ground for AAF and Tri-Rail passenger trains. EAC collaborated with New York City architectural firm Skidmore, Owings, & Merrill (SOM) on the design of one of the viaduct’s most prominent features, the distinctive V-shaped columns which enhance the aesthetics and open layout of the station’s entrance. In order to maintain the station’s high quality environment, EAC’s design also employs context-sensitive vibration impact mitigation, which would prevent train vibration from spreading into the station area. As an integrated component of the Miami Central Station, the design of the viaduct is an example of the sensitive balance of aesthetic form and function. d. (1) TITLE AND LOCATION (City and State) Port of Miami North Cruise Blvd. Extension Phase III Miami-Dade County, FL YEARS COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION N/A (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Engineer of Record for structural design of a two span continuous curved steel plate girder bridge with a skew angle of approximately 40 degrees. Weathering steel Grade 70W is utilized for the girders, which will be painted due to aggressive coastal conditions. To achieve cost saving and minimize impact to existing cruise terminals, augercast piles are proposed using FDOT developmental specifications. Due to complexity of the bridge, refined structural methodology using grid analysis was performed. e. (1) TITLE AND LOCATION (City and State) Tamiami Trail/SR90 – Miami-Dade County, FL YEARS COMPLETED PROFESSIONAL SERVICES 2007- 2014 CONSTRUCTION 2014 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Structural Engineer of Record for the design of a 1-mile long bridge. The bridge has a typical span of 80 feet, with a superstructure utilizing AASHTO Type IV beams and a substructure consisting of and 24-inch square pre-stressed concrete piles. The project was designed on an accelerated schedule and completed in 6 months. Post-design services included shop drawings review, RFI, and construction assistance 19. RELEVANT PROJECTS a. (1) TITLE AND LOCA TION (City and State ) PD&E Study for Venetian Causeway – FDOT District 6 YEARS COMPLETED PROFESSIONAL SERVICES 2014- Present (5 years) CONSTRUCTION NA (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm The project requirements include the inspection of the bridges, engineering reports, environmental documents, a Section 4(f) document and preliminary plans. Assistant Project Manager and Structural Engineer responsible for conceptual Structural Analysis and desig n of the ten low- level fixed span bridges, preparation of Preliminary Engineering Report study documents, public involvement workshops and activities, and coordination with sub-consultants and agenc ies. The V enetian Causeway bridges (ten low-level fix ed sp ans and two movable bascules) from North Bayshore Drive in Miami to Purdy Avenue in Miami Beach were originally built in 1926 and have been designated as historic landmarks by the City of Miami and City of Miami Beach; they are also listed on the National Register of Historic Places (NRHP). Extensive public involvement efforts are being done as part of this study. The PD&E study will look at alternatives that satisfy the public; protect the environment; are sensitive to the historic designation; result in bridges that are safe, maintainable and serve the needs of the public. b. (1) TITLE AND LOCATION (City and State ) Additional Elevators and Overhaul at the Dadeland North Metrorail Station Parking Garage - DTPW, Miami-Dade Transit YEARS COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION NA (3) BRIEF DESCRIPTION (B rief Scope, Si ze, Cost, etc.) AND SPECIFIC ROLE [ ] Chec k if project performed with current firm Lead Engineer Project consisted of the Design-Build RFP Development. Responsible for project management tasks, structural inspection, preparation of construction documents and specifications, cost estimating, and engineering support services. The Design-Build RFP development included Design and Construction Requirements, Construction Technical Specifications, and Conceptual Design Plans for the new elevator tower on the northern end of the existing parking garage, a new prefabricated Bus Operator Supervisor’s booth, a new canopy along the eastern side of the existing parking garage; modernization of existing elevators; and the overhaul and renewal of the existing parking. The project included extensive coordination with Miami-Dade Transit and DTPW facilities to meet all design and construction requirements. c. (1) TITLE AND LOCATION (City and State ) NW South River Drive Bridge over Tamiami River Canal - Miami-Dade County YEARS COMPLETED PROFESSIONAL SERVICES 2010 – 2014 (4 years) CONSTRUCTION 2014 - 2019 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Preliminary Study and Final Design of a 123-foot simple trunnion single leaf through-girder bascule span bridge to replace the Tamiami Canal Histo rical Swing Bridge constructed in 1921. The project includes providing a 4 lane wide bridge with 6 foot and 12 foot shared sidewalks and control house within a 50 foot limited right-of-way and low bridge profile which resulted in the need to use through-ba scule girders. The floor system consists of floor beams and an exodermic bridge deck with no steel stringers and lateral bracing. Architectural features to the bridge and control house are also included in the detail design. Structural Engineer responsible for the design of the single leaf bascule span bridge steel plate bascule floor-beams, design and detailing of the rest pier which includes pile, wall design, design and detail of seawall, quantities and cost estimate of finished project. d. (1) TITLE AND LOCA TION (City and State) Flagler Memorial Bridge SR A1A over ICWW - FDOT District 4 YEARS COMPLETED PROFESSIONAL SERVICES 2011-2014 CONSTRUCTION 2018 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm $95 million Design/Build contract to replace twin double leaf bascule span bridge with a 150’ rolling lift span over the navigable channel, 12- 150 foot pre-stressed concrete approach spans and approach roadway work. Project maintains traffic on existing bridge during construction of the new bridge. Structural Engineer responsible for approach substructure design (bascule pier walls, columns and beams) and abutment design including concrete monument support structure on drilled shaft foundations. Structural Engineer responsible for LRFR bridge load ratings for cast-in-place reinforced concrete slabs. e. (1) TITLE AND LOCATION (City and State) Sunny Isle Bascule Span Retrofit, Dade County, FL - FDOT District 4 YEARS COMPLETED PROFESSIONA L SERVICES 2007 CONSTRUCTION 2008 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Mathematical balance and dynamic strain gage measurement to determine bascule span balance condition for this four leaf bascule span bridge. Structural Engineer responsible for plans development and assisting Project Engineer with load calculations. 2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME: Stephanie Romero, PE 13. ROLE IN THIS CONTRACT: Deputy Project Manager 14. YEARS EXPERIENCE a. TOTAL: 13 b. WITH CURRENT FIRM: 5 15. FIRM NA ME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 16. EDUCATION (Degree and Specialization): 2006 Bachelor of Science in Civil Engineering – New York University Polytechnic School of Engineering 17. CURRENT PROFESSIONA L REGISTRATION (State and Discipline) Professional Engineer: Florida – 77593 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) SR A1A/Collins Avenue Improvements YEARS COMPLETED PROFESSIONAL SERVICES CONSTRUCTION NA (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Manager for design and plans preparation for the milling, resurfacing, restoration and rehabilitation of State Road A1A (Collins Avenue) between 5th and 15th Street in the City of Miami Beach. . b. (1) TITLE AND LOCATION (City and State) Tamiami Canal Historic Swing Bridge PD&E Study - FDOT D6 YEARS COMPLETED PROFESSIONAL SERVICES CONSTRUCTION NA (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Manager responsible for an Environmental Assessment (EA) PD&E study to consider the rehabilitation/replacement of a 1921 historic, two-lane, Bob-Tailed swing bridge over the Tamiami Canal and roadway reconstruction along the NW South River Drive/Delaware Parkway corridor. Project requirements include the collection of field traffic and travel data and the preparation of traffic, access management, engineering reports and environmental documents; a Section 4(f) document; and preliminary plans for this heavily urbanized arterial that services major business and residential communities. Improvements include a new higher, double-leaf Bascule Bridge; intersection reconstructions; and access management modifications. Extensive public involvement efforts are being done as part of this study. c. (1) TITLE AND LOCATION (City and State) Meridian Avenue over Collins Canal - FDOT D6 YEARS COMPLETED PROFESSIONAL SERVICES CONSTRUCTION 2014 - 2019 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Project Manager for the bridge replacement design services for the Meridian Avenue Bridge over Collins Canal. Improvements included: roadway, drainage, signalization, lighting and maintenance of traffic. Specifically, the project included the following: (1) Replacement of the bridge over Collins Canal; (2) Reconstruction of the south approach Meridian Avenue roadway. (3) Aesthetic/streetscape improvements which included: pigmented cement pavers for the roadbed and bridge, stone pavers for the sidewalk, stone veneer for the vertical surfaces of the bridge, and decorative lighting; (4) Drainage improvements which included the installation of a drainage well to dispose of the contaminated water prior to discharge into the Collins Canal and (5) Signalization and non-decorative roadway lighting. d. (1) TITLE AND LOCATION (City and State) PD&E Study for Venetian Causeway – FDOT District 6 YEARS COMPLETED PROFESSIONAL SERVICES 2012-Ongoing CONSTRUCTION N/A (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm The project requirements include the inspection of the bridges, engineering reports, environmental documents, a Section 4(f) document and preliminary plans. Project Manager and Structural Engineer responsible for conceptual Structural Analysis and design of the ten low level fixed span bridges, preparation of Preliminary Engineering Report study documents, public involvement workshops and activities, and coordination with sub-consultants and agencies. The Venetian Causeway bridges (ten low-level fixed spans and two movable bascules) from North Bayshore Drive in Miami to Purdy Avenue in Miami Beach were originally built in 1926 and have been designated as historic landmarks by the City of Miami and City of Miami Beach; they are also listed on the National Register of Historic Places (NRHP). Extensive public involvement efforts are being done as part of this study. The PD&E study will look at alternatives that satisfy the public; protect the environment; are sensitive to the historic designation; result in bridges that are safe, maintainable and serve the needs of the public. e. (1) TITLE AND LOCATION (City and State) Sunrise Blvd. (Hiatus Road to Pine Island Road) YEARS COMPLETED PROFESSIONAL SERVICES CONSTRUCTION N/A (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Principal in Charge responsible for the widening and resurfacing of this 1.5 mile segment of the existing four-lane divided Sunrise Blvd. between Hiatus Road and Pine Island Road. 2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME: Enrique “Rick” Crooks, PE 13. ROLE IN THIS CONTRACT: QA/QC-Bridges/Structures 14. YEARS EXPERIENCE a. TOTAL: 33 b. WITH CURRENT FIRM: 25 15. FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 16. EDUCATION (Degree and Specialization): 1991 - Master of Business Administration, Florida International University 1985 - Bachelor of Science in Civil Engineering, University of Florida 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer: Florida – 42528 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME:Michael Adeife, P.E., ENV SP 13. ROLE IN THIS CONTRACT:Quality Control-Civil/Roadway 14.YEARS EXPERIENCE a. TOTAL:27 b. WITH CURRENT FIRM:24 15. FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 16. EDUCATION (Degree and Specialization):MS in Civil Engineering, Florida International University BS in Civil Engineering, University of Lagos, Nigeria 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline):Florida Professional Engineer No. 56094 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.):Member of American Public Works Association (South Florida Chapter), American Society of Civil Engineers. Envision Certified Sustainability Professional (ENV SP) 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State)NW South River Dr. Streetscape Improvements – Town of Medley, FL YEARS COMPLETED PROFESSIONAL SERVICES 2013 CONSTRUCTION 2015 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firmEAC was tasked with the design for roadway, drainage and streetscape improvements along the NW S. River Drive corridor, from just southeast of NW 72nd Avenue to NW 74th Street within the Town of Medley, FL. This portion of NW S. River Drive is historically narrow, making it difficult for two-way vehicular traffic and all but impossible for pedestrian traffic. The Town awarded EAC with designing a new typical roadway section that incorporated a 6' wide concrete sidewalk, wider than standard width vehicular travel lanes, landscape improvement and hardscape enhancement through the main corridor and intersecting streets. This project achieved a safer travel corridor for vehicles, pedestrian access from Medley’s Riverside East Community Neighborhood, dedicated and shared use bicycle lanes along the corridor, overall beautification and a vibrant neighborhood. Role: Principal in Charge b. (1) TITLE AND LOCATION (City and State)Dixie Corridor Septic to Sewer Lift Stations – City of Hollywood, Hollywood, FL YEARS COMPLETED PROFESSIONAL SERVICES 2012 CONSTRUCTION 2016 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm As part of the City of Hollywood’s program to convert it’s residents from septic tanks to the City’s sewer system, EAC Consulting designed, permitted and provided construction administration services for four (4) lift stations along the Dixie Highway Corridor. One of the lift stations involved a complete rehabilitation of an existing station, while three others are new lift stations as part of converting commercial and residential areas within the Dixie Highway corridor from septic tanks to a centralized sewer system. Role: Project Manager c. (1) TITLE AND LOCATION (City and State)NW 41st Street, from NW 79th Avenue to NW 87th Avenue – City of Doral, FL YEARS COMPLETED PROFESSIONAL SERVICES 2011 CONSTRUCTION 2011 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Design Principal responsible for designing and permitting the roadway drainage design associated with NW 41st St, between NW 79th Ave to NW 87th Ave. The scope of work included the widening of an existing two-lane roadway (0.75 miles). Responsibilities included designing a fully on-site drainage system that consisted of drainage structures, storm sewers and French drains to dissipate the design storm. The project was designed to meet the requirements of MDC Public Works Dept. (MDPWD), MDC Dept of Environmental Resources Management (DERM) and the South Florida Water Management District (SFWMD). d. (1) TITLE AND LOCATION (City and State)NW 96th Street Drainage Improvements, Town of Medley, FL YEARS COMPLETED PROFESSIONAL SERVICES 04/2013 CONSTRUCTION 11/2013 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firmDesign Principal for this project, which consisted of drainage improvements along NW 96th St. from NW 87th Ave. to NW South River Drive. The existing road is located in the Town of Medley and it is approximately 2.33 acres based on Right of Way (R/W) delineation. The purpose of this project was to provide an adequately sized drainage system to comply with regulatory criteria, re-grading the existing swale areas and to provide roadway pavement cross-slope corrections through milling and asphalt resurfacing. These improvements will ultimately facilitate attenuation of excessive stages from routine storm events as well as increase the pavement structural capacity in addition to improving the drivability of the road. e. (1) TITLE AND LOCATION (City and State)Stormwater Improvement Implementation Plan - Village of Key Biscayne, FL YEARS COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION N/A (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project manager responsible to assist the Village of Key Biscayne in fulfilling goals for the six high priority area projects established in its Stormwater Improvement Implementation Plan in order to maximize fiscal efficacy and ensure compliance with the latest local, state, and federal regulations. The scope included implementing permanent and temporary erosion control systems, evaluation and analysis of existing drainage infrastructure, evaluation and design of backflow prevention devices, evaluation and design of gravity drainage wells, evaluation and design of possible pump station(s), evaluation and design of pressurized drainage wells, hydrologic and hydraulic evaluation of basins, sub-basins, and potential sub-basins, stormwater preliminary and final design, technical reports, plans preparation, bid document development, regulatory permitting, post design services, CA services and evaluation of high tide and its effect on the proposed drainage improvements. P- 40 19. RELEVANT PROJECTS a. (1)TITLE AND LOCATION (City and State) Hard Rock Stadium Pedestrian Bridges, City of Miami Gardens YEARS COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION 2020 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm Structural Project Manager responsible for the design services of two pedestrian bridges substructures, and for the MSE wall control drawings for the ramps at both bridge approaches. The bridges will facilitate pedestrian access to and from the Hard Rock Stadium which can hold up to 60,000 spectators. The bridge over NW 199th Street is 151’-11” long, while the other bridge over the Turnpike Access Road is 206’-11” long. Both bridge superstructures are simple span, variable-depth walk-thru steel trusses that are 14’ wide. The substructures consist of pile bents with 24” prestressed concrete piles. The bridges approach ramps consist of concrete walkways supported by wrap-around MSE walls. Stairs at the ramp entrances were also provided to facilitate pedestrian access during sport events. Construction on this fast-track Design-Build project began in mid-January 2019 and is scheduled for completion by the end of September 2019 - just in time for the onset of the NFL regular season and five months before the stadium hosts Super Bowl LIV. Location: Miami-Dade County, FL. b. (1)TITLE AND LOCATION (City and State)I-75 / I-595 Interchange Bridges, Phase II – Broward County, FDOT District 4 YEARS COMPLETED PROFESSIONAL SERVICES 1985-1987 CONSTRUCTION 1988-1990 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm Design of nine concrete segmental bridges for a four-level fully directional interchange of I-75, I-595, and the Sawgrass Expressway. At 550 acres, this is the largest interchange in Florida. Bridges included both single and twin boxes. Bridges ranged from just under 400 feet to almost 4000 feet in length. Maximum span length exceeded 200 feet. The combined length of the bridges exceeded two miles and bridge deck area exceeded 600,000 square feet. Pier heights exceeded 60 feet. Project required a total of 1,366 full section 10-foot segments which were cast on-site and then erected in balanced cantilever fashion. Mr. Hadrous was responsible for the design of all the segments for both the single and twin box bridges including typical segments, CIP segments, and pier segments. Mr. Hadrous also designed the cantilever and suspended expansion joint segments, the expansion joint hinge details, and longitudinal closure pours for the twin boxes. Mr. Hadrous was also responsible for quality control reviews of the design and plans for the Piers for Bridge F2 (8 Spans, 1071 feet). c. (1)TITLE AND LOCATION (City and State)Evans Crary Sr. Bridge – Martin County, FDOT District 4 YEARS COMPLETED PROFESSIONAL SERVICES 1994-1996 CONSTRUCTION 1997-2001 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm The Evans Crary Sr. Bridge has an overall length of approximately 2,982 feet with seventeen continuous spans and a maximum span length of 180 feet. The twin, precast segmental structures are 49’-4¼” wide and are separated by a 1’–6” gap. Each is wide enough to carry two traffic lanes, two emergency lanes, a bicycle lane, and a pedestrian lane. Rising at a vertical grade of 5.2%, the bridge provides 65 feet vertical and ninety feet horizontal clearance over the St. Lucie River and Piers were designed for Ship Impact. Box girders are a constant 8 feet in depth and the bridges are continuous from end to end with no intermediate expansion joints. Mr. Hadrous was responsible for the original design and detailing of the post-tensioned concrete box girders including typical segments, modified segments and cast-in place segments. He was also responsible for the segment anchorage details, future post-tensioning details, bridge erection schedules, segment shear key details, and bridge jacking details. d. (1) TITLE AND LOCATION (City and State)Flagler Beach Bridge YEARS COMPLETED PROFESSIONAL SERVICES 1993 CONSTRUCTION 1995 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Bridge Design Engineer Bridge Design Engineer for this high-level post-tensioned 72” Florida Bulb T bridge with 528’ typical superstructure units with four continuous spans of 132’ each. The bridge included over 25,000 linear feet of girders, 505,000 pounds of post-tensioning and 245,000 square feet of bridge deck. Mr. Hadrous was responsible for analysis, design and plans production for the post-tensioned concrete girders including tendon geometry and anchorage details. Location: Flagler County, FL. e. (1) TITLE AND LOCATION (City and State)YEARS COMPLETED 2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME:Abdulkadir (Abid) Hadrous, P.E.13.ROLE IN THIS CONTRACT:Quality Control 14.YEARS EXPERIENCE a. TOTAL:36 b. WITH CURRENT FIRM: 9 15.FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 16.EDUCATION (Degree and Specialization):1982 MSCE - Syracuse University 1981 BSCE - Syracuse University 17.CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer: Florida – 38648 18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): Port of Miami / Dodge Island Bridges – Miami-Dade County, FDOT District 6 PROFESSIONAL SERVICES 1987-1989 CONSTRUCTION 1990-1991 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm The Port of Miami Bridge over the Intracoastal Waterway is a high-level fixed structure providing vehicular access to and from the Port of Miami. It was the first double cell precast segmental box girder bridge in Florida. The width of each of the twin bridges is 53 feet and the depth of the box was 9’-3”. Overall bridge length was 2522 feet with sixteen spans ranging from 96 feet to 195 feet long. The structure consists of two continuous units. Unit 1 was a ten Span Continuous Unit 1674 feet in length. Unit 2 was six Span Continuous Unit 848 feet in length. The bridge provided a minimum vertical clearance of 65 feet over the Intracoastal Waterway, a horizontal clearance of 90 feet between fender systems, and piers were designed for ship impact. Mr. Hadrous was responsible for the design and detailing of all segmental units including standard segments, end segments, pier segments, and cast-in-place segments. Mr. Hadrous was also responsible for the bridge jacking details and utility attachment and access details (e.g. telephone duct bank, power duct bank). 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) SR-5/US1 from South Street to Magnolia/Shangri-La Drive, Volusia County, FL YEARS COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION 2016 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Quality Reviewer for design of foundations and approach slabs of two pedestrian bridges, box culvert extension, and post-design services. One feature of the design is aluminum prefabricated truss bridges are recommend to FDOT for the two pedestrian bridges across the creek, and technical special provisions of aluminum prefabricated truss bridges were prepared, since these are the first aluminum pedestrian bridges used in FDOT projects. b. (1) TITLE AND LOCATION (City and State) Snake Creek Pedestrian Bridge – North Miami Beach, FL YEARS COMPLETED PROFESSIONAL SERVICES 2008 CONSTRUCTION 2009 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. Li served as Structure Design Engineer and involved in the preliminary concept design and the final design of geometry, pile bent foundation. The new pedestrian bridge crossing the Snake Creek (C-9) Canal at Challenger Park in North Miami Beach replaced a timber structure that was decades old and in dire need of repair. So much so, that the timber structure was closed to traffic for a number of months before its demolition. EAC Consulting assessed the costs of repairing and continued maintenance versus replacing. The economics overwhelmingly proved that replacement would be in the City’s best interest. c. (1) TITLE AND LOCATION (City and State) Miscellaneous Maintenance Repairs of NW 116th Way Bridge Over C-6 Canal, Town of Medley, FL YEARS COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION 2011 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Structures Engineer for the project which consisted repair of cracks and spalls, retrofit of partial slab top reinforcement between the interior bents, application of FDOT specified epoxy as an overlay to the entire bridge deck, replacement of all expansion joints, replacement of damaged guardrails, repairs of the embankment at the abutments, and milling and resurfacing of the approach roadway to provide a smooth transition pavement to the bridge. EAC also prepared the MOT plans per the project requirements, and provided post-design services including shop-drawing review and construction assistance. d. (1) TITLE AND LOCATION (City and State) I Bridge Design and Plans Preparation for Linton Blvd over the E3 and E3 1/2 Canals YEARS COMPLETED PROFESSIONAL SERVICES 2001-2002 CONSTRUCTION N/A (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm The project includes Structural Design Engineering and plans preparation services for the replacement of Linton Blvd Bridges over the E4 and E3 1/2 Canals. Mr. Li served as Structure Design Engineer. The bridges are being replaced with transversely post-tensioned pre-stressed slabs unit bridges. One bridge is a three span concrete slab structure while the other is comprised of only one span. e. (1) TITLE AND LOCATION (City and State) SR-7/NW 5th Street Bridge Replacement over the Miami River YEARS COMPLETED PROFESSIONAL SERVICES 2005-2007 CONSTRUCTION N/A (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm The project includes one 150’ bascule bridge, one 34’ approach span at each end with CIP concrete slab, four MSE walls and one seawall around the bridge. Mr. Li served as the Project Engineer and was responsible for the overall design of the approach spans, the MSE walls and the seawall. He designed the MSE walls and the seawall and performed QC for the approach spans structure components. STANDARD FORM 330 (REV. 3/2013) PAGE 2 2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME: Chun Li, PE 13. ROLE IN THIS CONTRACT: Project Engineer Structures 14. YEARS EXPERIENCE a. TOTAL: 18 b. WITH CURRENT FIRM: 18 15. FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 16. EDUCATION (Degree and Specialization): 1999 MSCE in Structural and Foundation Civil Engineering - University of Central Florida 1995 MSCE - Geotechnical Engineering - Zhejiang University, P.R., China 1992 BSCE - Zhejiang University, P.R., China 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer: Florida – 63052 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): 19. RELEVANT PROJECTS a. (1)TITLE AND LOCATION (City and State)New Service Bridge, Palm Beach County, FL - South Florida Water Management District (SFWMD) YEARS COMPLETED PROFESSIONAL SERVICES Current CONSTRUCTION N/A (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm Bridge Design Engineer for the design of a service bridge approximately 200 feet length in upstream to carry light-duty vehicles and for the installation of a new trash removal system. The eight short span bridge is designed by utilizing precast slab with traffic barrier as superstructure and substructure consists of prestressed piles and end bent anchor walls. b. (1)TITLE AND LOCATION (City and State)Superstructure Replacement SR 80 Over New River Canal – Palm Beach County, YEARS COMPLETED PROFESSIONAL SERVICES 2011 CONSTRUCTION 2013 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm Bridge Design Engineer responsible for the design and quality control review for the bridge central span replacement (Bridge ID 930029). The bridge has three unequal spans with composite steel girder superstructure to carry high percentage heavy truck travel The project also included the structural analysis and load rating check for existing remained spans. c. (1)TITLE AND LOCATION (City and State) I-95/Spanish River Interchange – FDOT District 4; Palm Beach County, FL YEARS COMPLETED PROFESSIONAL SERVICES 2014 CONSTRUCTION 2018 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm Main Structural Engineer/Reviewer representing FDOT for the development of RFP (Request for Proposal), staff hour preparation and negotiation, coordination with FDOT central office for design variations and exceptions, etc. for this three-level fully directional new interchange The whole project included two main I-95 bridge widenings, two high profile bridge replacement crossing MDX rail, 11 new bridges and other miscellaneous structures. Ms. Wang was responsible for reviewing all bridge construction plans, coordinated with design consultant and central office for the design and post design issues. d. (1)TITLE AND LOCATION (City and State)Bridge Replacement Kingfisher Waterway NE 23 Ave - Broward County, FL YEARS COMPLETED PROFESSIONAL SERVICES 2014 CONSTRUCTION 2015 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Bridge Design Engineer for the design of a cast in place continuous deck bridge. The overall length of bridge is 68', with a three-span 16" cast-in-place slab sitting on pile bents. Each intermediate bent consists of 6 piles. The lateral earth pressure combined with vertical loads was resisted by bent/wing wall attached to dead-man anchor wall. The challenge of this project was the post design issue. The construction experienced predrilled pile for unknown utilities, extraordinary hard soil layers and unpredicted settlement of adjacent structures, etc. e. (1) TITLE AND LOCATION (City and State)Bridge Widening I-75 NB at Griffin Road - Broward County, FL YEARS COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION N/A (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm Bridge Design Engineer for the design of existing bridge widening. The bridge consist of a width of 94’-8 ½”, and from left to right the typical section is made up of the following elements: a 1’-4 ½” existing traffic railing; a 10’-0” shoulder; four 12’-0” traffic lanes; two 12’-0” entrance ramp lanes; a 10’-0” shoulder; and a 1’-4” traffic railing. Bridge length and span arrangement remain unchanged. Currently, the 127’-6” long, 7” thick deck is supported by AASHTO Type II beams. The widened portion of the bridge has an 8” thick deck supported by a Florida-I 36 beams. 2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME:Ning Wang, PE 13.ROLE IN THIS CONTRACT:Senior Structural Engineer 14.YEARS EXPERIENCE a. TOTAL:16 b. WITH CURRENT FIRM: 3 15.FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 16.EDUCATION (Degree and Specialization):17.CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer: Florida – 66993 18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): 19. RELEVANT PROJECTS a. (1) TITLE AND LOCA TION (City and State ) Design Pre-stressed Concrete Monorail Bridge YEARS COMPLETED PROFESSIONAL SERVICES 2013 CONSTRUCTION N/A (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Structures Engineer The project was the design of the monorail bridge for the city of Tabriz in northwest of Iran. The responsibilities as a structural engineer were: Designed pre-stressed concrete monorail bridge decks, columns and piles. Prepared layouts, drawings and technical reports, assisting projects manager in reviewing shop drawings and reports for general conformance with the structural engineering design concept, and communicating with client to develop and complete the projects. The project submitted to the Tabriz Municipality. b. (1) TITLE AND LOCATION (City and State ) Tehran Metro Stations YEARS COMPLETED PROFESSIONAL SERVICES 2012 CONSTRUCTION N/A (3) BRIEF DESCRIPTION (B rief Scope, Si ze, Cost, etc .) AND SPECIFIC ROLE [ ] Chec k if project performed with current firm Structures Eng ineer Designed Tehran metro stations, D7 and V7 including temporary and main retaining structures. The analysis and design included the soil-structure interaction analysis using PLAXIS 3D software and calculating the seismic loading from soil on stations’ walls. The analysis also included the stability and settlement of the underground stations. The design was performed using FHWAIF-99- 015, ACI 318-05 codes and the results submitted to Tehran Urban and Suburban Operation Co. As a structural engineer, he was also responsible for preparing design reports and drawings for the client. c. (1) TITLE AND LOCATION (City and State ) Design of Reinforced Concrete Slab for Railroad Tunnels YEARS COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION N/A (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Structures Engineer This project was to make rail infrastructure in center of Iran compatible with high-speed lines. As a structural engineer, his responsibilities were to design slab track as a replacement for the conventional ballasted track. The analysis and design included the dynamic analysis of the slab under train loading and the design of reinforced co ncrete slab. He also optimized the design of reinforced concrete slab for railroad tunnels resulting in about 5% decrease in costs. The results from 3D models, were presented at the 12th International Conference on Rail Transportation in Tehran in 2010 and awarded the Best Paper Award. d. (1) TITLE AND LOCA TION (City and State) Tehran Metro Retaining Wall YEARS COMPLETED PROFESSIONAL SERVICES 2007 CONSTRUCTION N/A (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Structures Engineer Designed the retaining walls for line 3 of Tehran Metro. Three types of retaining walls were designed depending on the geotechnical and loading conditions. The responsibilities included the stability analysis and structural design of the reinforced concrete wall employing AREMA and ACI 318 codes and preparing reports and plans. The results submitted to Tehran Urban and Suburban Operation Co. e. (1) TITLE AND LOCATION (City and State) Supervised Metro Construction YEARS COMPLETED PROFESSIONA L SERVICES 2006 CONSTRUCTION N/A (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Structures Engineer The project was the construction of the three underground metro stations of 4th line of Tehran metro. The primary responsibilities were: Materials quality control; Checking plans, drawings and quantities of materials; Checking the accuracy of design calculations; Preparing reports for project manager about project progress; Maintaining construction schedule and reviewing the schedule weekly and monthly; Day-to- day management of the site, including supervising and monitoring the site labor force and the work of subcontractors. 2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME: Mohammad Fesharaki, EI 13. ROLE IN THIS CONTRACT: Structures Engineer 14. YEARS EXPERIENCE a. TOTAL: 5 b. WITH CURRENT FIRM: 2 15. FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 16. EDUCATION (Degree and Specialization): PhD Structural Engineering, 2017 Florida International University MS Civil Engineering (Track & Structures), 2009 Iran University of Science and Technology (IUST) BS Civil Engineering, 2006 Iran University of Science and Technology (IUST) 17. CURRENT PROFESSIONA L REGISTRATION (State and Discipline) NCEES ID 17-947-75 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): 19. RELEVANT PROJECTS a. (1)TITLE AND LOCATION (CITY AND STATE)South Florida Water Management District (SFWMD), Strategic Plan YEARS COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION N/A (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm Aligned planning, budgeting and evaluation activities with agency priorities and plans. Coordinated with the Governing Board, Executive Office and Program Managers to identify priorities, define performance measures, and determine agency actions for success. Managed the SFWMD Strategic Plan annually from initiation to Governing Board adoption, through implementation, performance measurement and reporting. Coordinated the budget development process to ensure consistency between the Strategic Plan, Annual Work Plan, and budget; implemented strategic initiatives, developed metrics, evaluated and interpreted results for feedback to agency leadership and interested and affected parties. Made numerous presentations to the SFWMD Governing Board, local government commissions, advisory groups, and the public on water management issues. b. (1) TITLE AND LOCATION (City and State)South Florida Water Management District (SFWMD), South Florida Report YEARS COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION N/A (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm Managed the annual development of Volume II of the South Florida Environmental Report – which replaced numerous individual fiscal, capital improvement, water resource, and land management reports. Also penned South Florida Environmental Report legislative bill in coordination with DEP and Florida’s other water management districts. Resulting legislation based on bill language now guides all water management districts c. (1) TITLE AND LOCATION (City and State)South Florida Water Management District (SFWMD), Water Supply Plans YEARS COMPLETED PROFESSIONAL SERVICES 2004 CONSTRUCTION N/A (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm Supervised the development and implementation of four regional water supply plans that cumulatively cover the SFWMD. These regional plans include analyses of shortfalls in water resources versus demand forecasts, as well as implementing projects to make the necessary water resources available. Plan development included water resource analysis through mathematical modeling; economic analyses, budgeting and project development; as well as coordination with local governments, utilities and urban, agricultural and environmental interest groups. Coordinated water supply plan implementation with the Comprehensive Everglades Restoration Plan (CERP). Prepared cost projections for projects within regional water supply plans. d. (1)TITLE AND LOCATION (City and State)South Florida Water Management District (SFWMD), Comprehensive Plan Review YEARS COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION N/A (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm Supervised the SFWMD Comprehensive Plan review process to meet SFWMD responsibilities within specified deadlines. Supervised the SFWMD review of Comprehensive Plans for municipalities within the SFWMD, including Evaluation Appraisal Reports (EARs). e. (1) TITLE AND LOCATION (City and State)South Florida Water Management District (SFWMD), Interagency Water Management Coordination Project YEARS COMPLETED PROFESSIONAL SERVICES 2011 CONSTRUCTION N/A (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm Chairman of the Memorandum of Understanding Committee for the South Florida, Southwest Florida and St. Johns River water management districts, which negotiated agreements between these neighboring water management districts regarding water resource investigations, planning, regulation and water shortage declarations. Represented the SFWMD in inter-water management district efforts to develop consistent approaches to analyze urban and agricultural water use – elected chairman of the committee by other water management district representatives. E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME:David Gilpin-Hudson, AICP 13.ROLE IN THIS CONTRACT:Planning 14.YEARS EXPERIENCE a. TOTAL: 28 b. WITH CURRENT FIRM: 1 15.FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 16.EDUCATION (DEGREE AND SPECIALIZATION):1986 Master of Science, Agricultural Engineering – University of Florida 1982 Bachelor of Science in Agricultural Economics-University of Florida 17.CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) 1997 American Institute of Certified Planners (AICP) 18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): American Planning Association E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME:Huntley Higgins, P.E., PMP 13. ROLE IN THIS CONTRACT: Civil Engineering Design 14. YEARS EXPERIENCE a. TOTAL:22 b. WITH CURRENT FIRM:12 15. FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 16. EDUCATION (Degree and Specialization): 2001 Master of Applied Science in Civil/Environ. Eng. -University of Toronto 1995 Bachelor of Science in Civil Engineering- University of the West Indies 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer: Florida 60726 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): Project Management Professional (PMP) American Water Works Association (AWWA) 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State)Biscayne Boulevard 12-inch Force Main Extension Improvements – City of North Miami, FL YEARS COMPLETED PROFESSIONAL SERVICES 2013 CONSTRUCTION 2015 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Manager and Senior Civil Engineer responsible for the design, permitting and construction administration of 5800 LF of 12-inch force main along Biscayne Boulevard, which is maintained by the Florida Department of Transportation (District VI), between NE 105th Street to NE 119th Street and then west to NE 16th Avenue. The project has an estimated construction cost of approximately $1.5 Million. The goal of the project is to provide the City with additional sewer conveyance capacity and meet regulatory operation criteria. b. (1) TITLE AND LOCATION (City and State)Washington Park Master Plan – City of North Miami Beach, North Miami Beach, FL YEARS COMPLETED PROFESSIONAL SERVICES 2012 CONSTRUCTION N/A (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firmProject Manager and Senior Civil Engineer responsible for developing a Master Plan for the redevelopment of a 2.1 acre park within the City of North Miami Beach. The design incorporated elements such as Crime Prevention Through Environmental Design (CPTED) concepts. The proposed park facilities include recreational fields for various sporting activities, outdoor pools, playgrounds, basketball courts and on-site parking facilities. A new state of the art recreational community center was proposed that houses a day care facility, ceramics studio, gymnasium, and other essential programs. In addition, several green initiatives were proposed to promote water and energy conservation practices. The construction cost for this project was estimated at $8,500,000. The goal of the project was to deter crime within the existing park facility by improving the access to quality and safe recreational facilities for residents. c. (1) TITLE AND LOCATION (City and State)NW 41St Street, from NW 79th Avenue to NW 87th Avenue – City of Doral; Doral, FL YEARS COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION TBD (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Drainage Engineer responsible for designing and permitting the roadway drainage design associated with NW 41st Street, between NW 79 Avenue to NW 87th Avenue. The scope of work included the widening of an existing two lane roadway (0.75 miles). Responsibilities included designing a fully on-site drainage system that consisted of drainage structures, storm sewers and french drains to dissipate the design storm. The project was designed to meet the requirements of Miami-Dade County Public Works Department (MDPWD), Miami-Dade County Department of Environmental Resources Management (DERM) and the South Florida Water Management District (SFWMD). d. (1) TITLE AND LOCATION (City and State)Palmer Park Site & Parking Lot Improvements, City of South Miami YEARS COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION 2019 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Project Manager and Engineer of Record for the design of Palmer Park’s improvements to its south & east parking lot. The project included the design of a site plan. drainage, paving and grading, striping and signage, etc. The drainage system included the design and use of filter socks, exfiltration trenches and a CDS hydrodynamic separator to alleviate flooding due to onsite and offsite flows. e. (1) TITLE AND LOCATION (City and State)Dixie Corridor Septic to Sewer Lift Stations – City of Hollywood, Hollywood, FL YEARS COMPLETED PROFESSIONAL SERVICES 2012 CONSTRUCTION 2015 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Manager and Senior Civil Engineer responsible for the design, permitting and construction administration services for four sewer lift stations in the City of Hollywood (W-08, W-09, W-10 and E-22). One of the lift stations was a complete replacement design for an existing station and the other two were new lift stations that are being added to their network. The project has an estimated construction cost of approximately $1.3 Million. The goal of the project was to allow residential and commercial properties to disconnect from their septic tanks and connect to sewer treatment systems thereby reducing environmental impacts. P-43 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME:Evelyn Rodriguez, P.E., ENV SP 13. ROLE IN THIS CONTRACT:Civil Engineering Design 14. YEARS EXPERIENCE a.TOTAL:9 b.WITH CURRENT FIRM:9 15. FIRM NAME AND LOCATION (City and State):EAC Consulting, Inc. – 5959 Blue Lagoon Suite 410, Miami Fl 33126 16. EDUCATION (Degree and Specialization): 2013 MS in Engineering Management – Florida International University 2010 BS in Civil Engineering – Florida International University 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Florida Professional Engineer – 78548 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.):Envision Sustainability Professional Member - American Society of Civil Engineers (ASCE) ASCE Miami Dade Branch Young Engineer of the Year 2017-2018 19. RELEVANT PROJECTS a. (1)TITLE AND LOCATION (City and State)Rehabilitation of Parking Lot No.7, 20 and 30, Coral Gables, FL YEARS COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION N/A (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Engineer of Record responsible for implementing improvements to the existing lots to alleviate concerns relating to deficient conditions including storm water ponding issues, ADA compliance, parking lot grading corrections, inadequate lighting levels, pavement irregularities, aesthetic landscaping upgrades and other visual defects. Furthermore, the City intends to enhance its parking lots by incorporating elements of sustainability and “green” environmentally friendly features that are consistent with the City’s initiatives. b. (1)TITLE AND LOCATION (City and State)Greynolds Park Rehabilitation and Improvements, Miami Gardens, Fl YEARS COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION 2019 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firmEngineer of Record for the site investigation, review of permitting agency requirements, schematic design and preliminary opinion of probable cost and construction documents, permitting and limited construction administration. This project included the preliminary evaluation and design of park the improvements such as parking lot renovations, access roadway re-alignment, existing culvert assessment and maintenance and new sidewalks. The project also included the regrading of the maintenance facility yard. c. (1)TITLE AND LOCATION (City and State)SW 64th Avenue (Twin Lakes Drive) Drainage Improvement, South Miami, FL YEARS COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION 2017 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firmEngineer of Record responsible for design of a new storm water collection and disposal system, including a newly design exfiltration trench drainage system to ameliorate the ponding being experienced by some of the residents along Twin Lake Drive. The project included 136 linear feet of French Drain with a safety of factor of 2, 6-proposed Type D3 inlets and 3 drainage manholes. The regrading of the swales within the drainage basin was paramount in making the proposed drainage system work efficiently. d. (1)TITLE AND LOCATION (City and State)NW 96th Street Roadway and Drainage Improvements, Town of Medley, FL YEARS COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION N/A (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ X] Check if project performed with current firm Engineer of Record for providing professional engineering design services for the preparation of construction documents for drainage improvements along NW 96th Street from SW River Drive to NW 87th Avenue. The scope of work included design of drainage system to collect and discharge into the C6 Canal, design, redefining cross slopes to facilitate drainage, design of complete streets concept (to improve pedestrian and bicycle traffic), pavement markings, permitting and opinion of cost. e. (1)TITLE AND LOCATION (City and State)I-75 Alligator Alley Environmental Education Project- Broward County, FL YEARS COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION TBD (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Engineer of Record for providing professional engineering design services for the improvement of the existing I-75/Alligator Alley rest area by constructing educational amenities which will require significant site work to reconfigure existing parking lots, access roads, drainage structures, utilities, lighting and sidewalks. Proposed educational amenities will include observation tower, board walks, walkways, constructed wetlands exhibits, asphalt trails, pavilions, hardscape (i.e. benches, trash receptacles, drinking fountains) and landscape. P-42 19.RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State)I-75 Alligator Alley Environmental Education Project – FDOT District 4,Broward County, FL YEARS COMPLETED PROFESSIONAL SERVICES On-going CONSTRUCTION N/A (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Designer for providing professional engineering design services for the improvement of the existing I-75/Alligator Alley rest area by constructing educational amenities within the existing site. Construction of educational amenities will require significant site work to reconfigure existing parking lots, access roads, drainage structures, utilities, lighting and sidewalks. Proposed educational amenities may include observation tower, board walks, walkways, constructed wetlands exhibits, asphalt trails, pavilions, hardscape (i.e. benches, trash receptacles, drinking fountains) and landscape. A decorative Alligator statue will be constructed within Environmental Educational Center limits. b. (1)TITLE AND LOCATION (City and State)Rehabilitation of Parking Lot No.7, 20 and 30 (including Galiano Park)– City of Coral Gables, Miami, FL YEARS COMPLETED PROFESSIONAL SERVICES On-going CONSTRUCTION N/A (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Designer for providing professional engineering design services for the rehabilitation of three parking lots in the City of Coral Gables. The City had informed EAC of its intent to implement improvements to the existing lots to alleviate concerns relating to deficient conditions including storm water ponding issues, ADA compliance, parking lot grading corrections, inadequate lighting levels, pavement irregularities, aesthetic landscaping upgrades and other visual defects. Furthermore, the City intended to enhance its parking lots by incorporating elements of sustainability and “green” environmentally friendly features that are consistent with the City’s initiatives. c. (1) TITLE AND LOCATION (City and State)Rehabilitation of City North Miami Wastewater Pump Stations (PS-24, PS-12 and PS-10) – City of North Miami, FL YEARS COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION 2019 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firmDesigner responsible for the construction oversight of three pump stations owned by the City have been identified with insufficient capacity per the City’s hydraulic analyses as part of the City’s Sanitary Sewer Master Plan. The pump stations will require upgrades to allow for the stations to satisfy the minimum working conditions and comply with jurisdictional and regulatory standards for operations. These pumps are:1) PS 24- Hospital Station located at NE 16th Avenue and NE 125 St 2) PS 10- Sans Souci 1 located on Canal Drive between NE 117 Rd and NE 118th Rd 3) PS 12- Sans Souci 3 located on 2100 Sans Souci Blvd. At the intersection of NE 122nd road and Canal Drive, there is ponding issues. EAC is to regrade the intersection and address the drainage issues with a drainage inlet that connects to the existing drainage system. d. (1)TITLE AND LOCATION (City and State)NW 96th Street Redesign– Town of Medley, Medley, FL YEARS COMPLETED PROFESSIONAL SERVICES On-going CONSTRUCTION N/A (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Provided professional engineering design services for the preparation of construction documents for drainage improvements along NW 96th Street from SW River Drive to NW 87th Avenue. The scope of work included design of drainage system to collect and discharge into the C6 Canal, design, redefining cross slopes to facilitate drainage, design of complete streets concept (to improve pedestrian and bicycle traffic), pavement markings, permitting and opinion of cost. e. (1) TITLE AND LOCATION (City and State)Gallery at Smathers Plaza – Related Urban Group; Miami, FL. YEARS COMPLETED PROFESSIONAL SERVICES On-going CONSTRUCTION N/A (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Designer for providing professional engineering design services for the preparation of construction documents for Gallery at Smathers Plaza development. The project is an 8-story residential complex/building comprised of 126 units located along SW 29th Court and SW 9th Street in Miami-Dade County, Fl. The project is part of a 5.7 Acres property where Smathers Phase I has interior renovations being done and Smathers Phase 2 was recently constructed in 2016. Project scope includes utility relocation, grading and drainage, site geometry and cross sections. The project also includes new parking areas, potable water main extension, and water service line. STANDARD FORM 330 (REV. 3/2013) PAGE 2 2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME:Miguel Lockward, PE 13.ROLE IN THIS CONTRACT:Civil Engineering Design 14.YEARS EXPERIENCE a.TOTAL: 5 b. WITH CURRENT FIRM:1 FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 15.EDUCATION (Degree and Specialization):2014 Bachelor of Science in Civil Engineering, Instituto Tecnologico de Santo Domingo (INTEC) 16.CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer, State of Florida No. 88552 17.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.):American Society of Civil Engineers 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) SR 826/Palmetto Express Lanes from North of Canal C-8 Bridge (NW162 St.) to East of NW 67th Avenue (FPID No. 435760-2-52-01) FDOT District 6, Miami, FL YEARS COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION 2023 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Engineer for the Temporary Traffic Control Plans for the reconstruction of this 1.5 mile segment of the Palmetto Expressway to widen for the implementation of Express Lanes. The existing six-lane divided limited access facility will be widened to accommodate two express lanes and provide auxiliary lanes between the interchanges. A tolling point will be provided within this section and a Single Point Urban Interchange (SPUI) will be provided at NW 67 Ave. The project requires extensive coordination with the adjacent projects, FTE, City of Miami Lakes and Miami-Dade County. The project is the second segment (Segment 2) of six segments that extends the Express Lanes from I-75 to the I- 95/Golden Glades Interchange. b. (1) TITLE AND LOCATION (City and State) Express Lanes - SR 826 from Flagler Street to NW 154 Street and I-75 from SR 826 to NW 170 Street, Miami, FL YEARS COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION 2019 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm Roadway Engineer for this project. The scope of the proposed improvements includes design and construction of 10 miles of Express Lanes along SR 826 and 3 miles along I-75. The project limits extend from West Flagler Street to NW 154th Street along SR 826, and from SR 826 to NW 170th Street along I-75. The project includes the widening of 9 bridges along SR 826 as well as the new 826/I-75 Express Lanes connector. c. (1) TITLE AND LOCATION (City and State) Boca Grande Causeway North Swing Bridge over Gulf ICWW, Placida, Florida, Project No. 2010-03, Gasparilla Island Bridge Authority, Gasparilla Island, FL YEARS COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION N/A (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm Roadway Engineer responsible for performing QA/QC of roadway and TTCP designs and plans for the Final Design for the replacement of a 220-foot swing-span bridge. Project consists of 678 feet of new bridge including a 250-foot deck girder swing span and approach spans utilizing Florida I-Beams. Embankments are supported by MSE walls and protected by new bulkheads and revetment. In addition to the bridge structures and new pile support tender house is part of the scope. Responsible for development of the preliminary roadway geometrics and proposed drainage design. d. (1) TITLE AND LOCATION (City and State) SR 968/SW 1st Street Bridge over Miami River, FM No. 424407-1-52-01, Miami, FL YEARS COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION 2022 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Lead roadway engineer responsible for TTCP and the geometrical realignment (both horizontal and vertical) of the approach roadway segments associated with the replacement of the nationally registered historic SW 1st St Bridge crossing the Miami River. Constructed in 1929, the existing 650.5-foot, 13-span bridge is the gateway crossing into downtown Miami. The new 507-foot bridge will include a 315-foot double-leaf bascule span over a widened 125-foot navigation channel. Two new approach spans will consist of prestressed concrete beams providing at least 16.5 feet of clearance over North and South River Drives. Bascule span roadway deck will be an exodermic concrete deck providing protection of the steel superstructure and a safer/quieter riding surface. The existing roadway at both ends of the bridge will be raised by several feet in order to accommodate the new bridge, requiring major reconstruction and a complex TTCP detour. e. (1) TITLE AND LOCATION (City and State) SR-90/US-41/Tamiami Trail Bridge project (FM No. 434922-1-52-01) FDOT District 6, Miami, FL YEARS COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION 2019 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm Roadway, TTCP, and S&PM EOR for this project in the eastern Everglades of Miami-Dade County which replaced approximately 2 miles of the existing at-grade roadway with 2 elevated bridges to restore the natural flow of water within the Everglades basin. This Design-Build project required extensive coordination with National Parks Service and the Florida Department of Environmental Protection as well as local businesses and residents. STANDARD FORM 330 (REV. 3/2013) PAGE 2 2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME: Satiar Shirazi, PE 13. ROLE IN THIS CONTRACT: Highway Design Roadway 14. YEARS EXPERIENCE a. TOTAL: 12 b. WITH CURRENT FIRM: ≤ 1 15. FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 16. EDUCATION (Degree and Specialization): JD, Florida International University, 2019 BS Civil Engineering, University of South Alabama, 2007 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Florida Professional Engineer – 75734 California – #78673 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME: Rodney Devera, P.E. 13. ROLE IN THIS CONTRACT: Highway Design Roadway 14. YEARS EXPERIENCE a. TOTAL: 15 b. WITH CURRENT FIRM: 14 15. FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 16. EDUCATION (Degree and Specialization): 2004 Bachelor of Science in Civil Engineering, University of Central Florida 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Florida Professional Engineer – 71384 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): FDOT Advanced MOT Certification | FDOT Specifications 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Roadways and Complete Infrastructure Improvements: Franjo Road (Design-Build) – Village of Palmetto Bay, FL YEARS COMPLETED PROFESSIONAL SERVICES ONGOING CONSTRUCTION ONGOING (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Manager responsible for the engineering design and permitting for the reconstruction of two existing roadways, which are Franjo Road from SW 184th Street (Eureka Drive) to south of US-1/South Dixie Highway and SW 180th Street from Franjo Road to SW 95th Avenue (Park Drive). The project also includes the construction of three new roads, SW 178th Street, SW 179th Street, and Park Drive. All of these roadways are part of the Village’s future Central Business District (CBD) and will be designed to be complete streets, including ADA compliant curb ramps, sidewalks, new bike lanes, new on-street parking, a new traffic circle at the intersection of Franjo Road and SW 181st Terrace and a pedestrian circle. Additional improvements include landscaping, decorative pavers, new water and sanitary sewer mains, stormwater management systems, underground utility relocations of FPL Distribution, AT&T and Comcast aerial facilities, reconstruction of damaged driveway aprons, new striping and paver crosswalks with the Palmetto Bay logo inset, new LED street lights, new street signage, new entryway signage, landscaped medians, clock tower, information kiosks, and street furnishings. Public involvement is also part the project. b. (1) TITLE AND LOCATION (City and State) Stock Island II Roadway Improvements – Key West, FL YEARS COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION N/A (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Manager responsible for the engineering design and permitting. The improvements planned for MacDonald, Maloney, and Peninsular milling and resurfacing, road reconstruction, drainage improvements, sea level rise impact analysis, bike lanes, sidewalk repair, signing and pave with Disabilities Act (ADA) compliant sidewalk ramps, utility coordination and a new landscape median. The project also including coordination w part of their Small County Outreach Program (SCOP). c. (1) TITLE AND LOCATION (City and State) SW 72nd Avenue and SW 98th Street Traffic Circle - Village of Pinecrest YEARS COMPLETED PROFESSIONAL SERVICES 2011 CONSTRUCTION N/A (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Manager and Engineer of Record responsible for the design of a new traffic circle. The traffic circle provides traffic calming at the intersection of two frequently used roadways in the Village of Pinecrest. The project includes roadway widening, milling and resurfacing, grading and new signing and pavement markings. Coordinated with permitting agencies, provided technical specifications and developed an engineering opinion of probable construction cost. d. (1) TITLE AND LOCATION (City and State) NW 41st Street from NW 79th Avenue to NW 87th Avenue – City of Doral YEARS COMPLETED PROFESSIONAL SERVICES 2012 CONSTRUCTION N/A (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Project Manager and Engineer of Record responsible for the design of widening an existing two-way roadway to include a left turn lane. Improvements also include a new sidewalk, stormwater management system, signing and pavement markings, lighting, utility coordination, landscaping, permitting as well as coordination with adjacent projects. e. (1) TITLE AND LOCATION (City and State) Commerce Lane Improvements – City of South Miami; South Miami, FL YEARS COMPLETED PROFESSIONAL SERVICES 2011 CONSTRUCTION 2012 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Engineer of Record with responsibilities that include site layout, paving, grading, drainage, signage, pavement markings permitting and opinion of probable cost. This project includes improvements along the road from SW 68th Street to SW 70th Street. P- 45 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME: Darren Dyer, PE Drainage 14. YEARS EXPERIENCE a. TOTAL: 12 b. WITH CURRENT FIRM: 6 15. FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 16. EDUCATION (Degree and Specialization): 2006 Bachelor of Science in Civil Engineering, FIU, Miami, FL 2003 Bachelor of Science in Aerospace Engineering, UF, Gainesville, FL 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer: Florida – 73951 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): American Society of Civil Engineers 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) I-95 (SR 9) at Gateway Boulevard Interchange Design, Boynton Beach, FL YEARS COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION Unknown (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Drainage Engineer responsible for the development of a drainage report, plans production, drainage calculations and AdICPR model, as well as hydraulic grade line calculations and drainage construction plans using GeoPak Drainage. b. (1) TITLE AND LOCATION (City and State) SR 710/Beeline Highway Widening Project, Martin County, FL YEARS COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION 2019 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Drainage Project Engineer responsible for Major Strategic Intermodal System corridor project that involves reconstruction of an existing two-lane facility to four-lane divided facility with concrete pavement and new open drainage system with linear dry detention ponds (swales). Responsible for developing all conceptual and final design drainage deliverables, and obtaining all required environmental permit approvals, including a South Florida Water Management District Environmental Resource Permit and United States Army Corps of Engineers Section 404 Dredge and Fill Permit. c. (1) TITLE AND LOCATION (City and State) West Palm Beach Army Reserve Center, West Palm Beach, FL YEARS COMPLETED PROFESSIONAL SERVICES 2014 CONSTRUCTION 2018 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Engineer responsible for drainage design, drainage report, and drainage plans for a new institutional site development. Responsible for obtaining the SFWMD Standard General ERP, SFWMD Dewatering Permit, NPBCID Permit, and Palm Beach County Drainage Permit. d. (1) TITLE AND LOCATION (City and State) Stormwater Master Plan Update, Broward College (Central Campus), Davie, FL YEARS COMPLETED PROFESSIONAL SERVICES 2012 CONSTRUCTION N/A (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Drainage Engineer responsible for hydrologic and hydraulic modeling of stormwater infrastructure within the campus. Project Tasks include determination of the stormwater management level of service standards for the campus, to assess the current conditions and what stormwater infrastructure is required to fulfill the requirements of the existing Stormwater Master Plan and to provide recommendations for stormwater infrastructure based on future development within the campus. e. (1) TITLE AND LOCATION (City and State) Palm Avenue Roadway Improvements for Stirling Road to Griffin Road, Cooper City, FL YEARS COMPLETED PROFESSIONAL SERVICES 2011 CONSTRUCTION N/A (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Engineer responsible for Drainage Design (Roadway)/Site Development/Paving, Grading and Drainage. Responsible for drainage analysis and hydrologic and hydraulic modeling, preparation of the drainage report and creation of drainage related plans for the roadway improvements project. The project included a wet detention pond. f. (1) TITLE AND LOCATION (City and State) City of Miami Stormwater Master Plan Update, Miami, FL YEARS COMPLETED PROFESSIONAL SERVICES 2010 PROFESSIONAL SER N/A (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Drainage Engineer responsible for hydrologic and hydraulic modeling of existing and future condition land uses, identification and ranking of problem areas, evaluation of drainage projects under construction and projects under design for portions of the City of Miami. Tasks involve evaluating available data, updating Stormwater Wastewater Management. Model (XP-SWMM), Version 8.2 models and utilizing XP-SWMM models to assess existing and future models’ peak stages, flows, and volumes obtained. P- 49 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) NW South River Drive Improvements- Town of Medley, Florida YEARS COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION 2017 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Engineer of Record responsible for the design of lighting improvements on NW South River Drive in the Town of Medley. Our involvement included the photometric and voltage drop analyses as well as the evaluation of LED lighting and coordination of load centers with the utility power company. b. (1) TITLE AND LOCATION (City and State) Miami Dade Expressway Authority Systemwide Lighting Improvement Contract – Miami, Florida YEARS COMPLETED PROFESSIONAL SERVICES 2007 CONSTRUCTION 2007 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Manager for systemwide roadway improvements project. Included the replacement of aging secondary load centers, safety improvements, installation of break-away pole bases and other system components to comply with current safety standards. c. (1) TITLE AND LOCATION (City and State) Widen NW 41St. Street from NW 79th to 87th Ave. – City of Doral, Florida YEARS COMPLETED PROFESSIONAL SERVICES 2011 CONSTRUCTION 2012 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm The project consisted of widen NW 14th Street from a two-lane roadway to a two-lane roadway with a shared turning lane. The project consisted of converting a roadway with a rural section to an urban section. Complete onsite drainage was required to meet the requirements of the Miami-Dade County, Department of Environmental Resources Management (DERM). Mr. Borges was responsible for reviewing voltage drop and photometric analyses, plans and QC the lighting plans. d. (1) TITLE AND LOCATION (City and State) SW 66th Street Roadway Improvements – City of South Miami, Florida YEARS COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION 2010 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Engineer of Record responsible for the design of lighting improvements. Our involvement included the photometric and voltage drop analyses for the installation of aesthetic lighting on SW 66th St. e. (1) TITLE AND LOCATION (City and State) SR-823 from Okeechobee Rd. to W. 18th Street – City of Hialeah, Florida YEARS COMPLETED PROFESSIONAL SERVICES 2011 CONSTRUCTION 2011 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Engineer of Record responsible for the roadway lighting improvements on SR 823. The project extended from Okeechobee Rd. to W 18th Street in the City of Hialeah. f. (1) TITLE AND LOCATION (City and State) Miami Dade Expressway Authority Roadway Improvements on SR 836 by NW 57th Ave. – Miami, Florida YEARS COMPLETED PROFESSIONAL SERVICES 2009 CONSTRUCTION 2009 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Reviewed roadway lighting design as representative for MDX for compliance with contract documents, review of shop drawings and submittals. 2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME: Ramon Borges, PE 13. ROLE IN THIS CONTRACT: Senior Roadway Lighting Engineer 14. YEARS EXPERIENCE a. TOTAL: 27 b. WITH CURRENT FIRM: 10 15. FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 16. EDUCATION (Degree and Specialization): BS – Electrical Engineering, University of Oriente, Cuba (1992) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer: Florida – 61622 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): IMSA Fiber Optics for ITS Level I 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) SR 968/SW 1 Street Bridge Maintenance of Traffic (MOT) Real Time Monitoring Pilot Project, FDOT District 6 YEARS COMPLETED PROFESSIONAL SERVICES 2014 CONSTRUCTION N/A (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Project Manager responsible for developing a turnkey solution for this arterial traffic management concept. This project’s intent was to minimize delays and support additional traffic during the MOT phase along the detour route using TSM&O strategies such as real-time traffic monitoring using temporary closed-circuit television (CCTV) cameras; daily travel time data collection and analysis using temporary Wi-Fi devices; and temporary signal timing modifications at impacted signals along the detour route. Project also included coordination with Project CEI relating to MOT improvements and coordination with Miami-Dade County Traffic Signal staff for signal timing changes. b. (1) TITLE AND LOCATION (City and State) SR 826 Palmetto Expressway Segment 2 Project, FDOT District 6 YEARS COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION N/A (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Senior ITS Engineer responsible for QA/QC of the ITS and Tolling Plans for this 1.5 mile segment Express Lanes corridor. Major ITS Project components include DMS, CCTV Cameras, MVDS, Ramp Signals, fiber optic cable and power distribution system. c. (1) TITLE AND LOCATION (City and State) SR 924/NW 119 Street ASCT Pilot Project, FDOT District 6 YEARS COMPLETED PROFESSIONAL SERVICES 2015-2017 CONSTRUCTION N/A (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Project Manager responsible for overseeing the development of the Pilot Project procurement documents and lead owner’s representative for the deployment of an adaptive signal control system along NW 119 Street from eastern terminus of SR 924 Gratigny Parkway (west of NW 32 Avenue) to NW 5 Avenue (east of I-95) and along SR 9/NW 27 Avenue from NW 110 Street to NW 119 Street. This 3 mile and 15 signalized intersection corridor included next generation traffic signal controller’s upgrade, new video detection system, new fiber optic cable based communications system, among others. The project procurement documents included development of PSEMP, ConOps, Request for Proposal, Signalization concept plans, cost estimates, schedules and coordination activities. d. (1) TITLE AND LOCATION (City and State) SR 90/SW 8 Street Adaptive Signal Control Technology (ASCT) Pilot Project, FDOT District 6 YEARS COMPLETED PROFESSIONAL SERVICES 2015-2017 CONSTRUCTION 2017 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Project Manager responsible for developing the project procurement documents and lead owner’s representative for the deployment of an adaptive signal control system along SW 8 Street from SW 67 Avenue to SW 142 Avenue. The project procurement documents included development of a Project Systems Engineering Management Plan (PSEMP), Concept of Operations (ConOps), O&M Plan, Request for Proposal (RFP) and Minimum Technical Requirements. In addition, Girish supported in the development of the Project’s Evaluation Plan, Community Awareness Plans, Deployment Plans, and a Technical Plan for this Pilot Project. He also supported the Department in planning the performance metric dashboards for the Pilot Project. e. (1) TITLE AND LOCATION (City and State) TSM&O Program GEC Consultant, FDOT District 6 YEARS COMPLETED PROFESSIONAL SERVICES 2012-2017 CONSTRUCTION N/A (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Senior Project Engineer involved in the development of numerous District 6 TSM&O Program initiatives such as the TSM&O Strategic Plan, TSM&O presentations and outreach material, District’s Core group meetings, Pilot Projects, etc. Multiple continuing initiatives included development of Monroe County Traffic Signal System ConOps and Implementation Plan, TSM&O Action Plan, Miami-Dade County Traffic Signal Maintenance Compensation Agreement (TSMCA) oversight support, Okeechobee Projects TSM&O deployments review oversight, etc. 2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME: Girish Thallapragada, PE 13. ROLE IN THIS CONTRACT: Lighting 14. YEARS EXPERIENCE a. TOTAL: 18 b. WITH CURRENT FIRM: 2 15. FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 16. EDUCATION (Degree and Specialization): 2001 MS in Civil Engineering, Certified ITS Graduate Virginia Polytechnic Institute and State University 2000 BS in Civil Engineering Andhra University 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer: Florida – 73642; Texas - 101296 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) North Cruise Boulevard Lighting Design, Miami, Miami-Dade County, FL Port of Miami YEARS COMPLETED PROFESSIONAL SERVICES N/A CONSTRUCTION (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm Electrical designer for 0.7 miles of roadway and overpass bridge. Includes upgrading existing light poles with new Light Emitting Diode (LED), upgrading new load center main and branch circuit breakers, circuit wire sizing and new underground conduits b. (1) TITLE AND LOCATION (City and State) City of Doral NW 41 Street Lighting Project YEARS COMPLETED PROFESSIONAL SERVICES N/A CONSTRUCTION (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm Electrical designer for 0.8 miles of roadway lighting on NW 41 Street between NW 79 Avenue and NW 87 Avenue. Includes upgrading existing light poles with new Light Emitting Diode (LED). c. (1) TITLE AND LOCATION (City and State) Traffic Management Center (TMC) Support Engineer, Miami-Dade County, FL-FDOT District 6 YEARS COMPLETED PROFESSIONAL SERVICES N/A CONSTRUCTION (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm Provided assessment and electrical design services to modify the Traffic Management Center (TMC) with added electrical infrastructure to support the 2nd floor Florida Highway Patrol (FHP) TMC operations. This included load monitoring and data analysis of existing power distribution equipment within the TMC network room to determine if the additional FHP loads could be added to the existing Power Distribution Equipment (PDU). Review of the existing branch circuits within d. (1) TITLE AND LOCATION (City and State) Statewide Telecommunications Integration - (ITS) Wide Area Network (WAN) Deployment | Miami-Dade County, FL, - FDOT District 4 & 6 YEARS COMPLETED PROFESSIONAL SERVICES N/A CONSTRUCTION (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Under PB Farradyne and Telvent, provided electrical designs to integrate FDOT’s Intelligent Transportation System (ITS) Wide Area Network (WAN) which provides connectivity throughout the state by utilizing the statewide microwave system to connect the Regional Transportation Management Centers (RTMC) across the state. This project added network equipment into existing racks at District 4 and 6 to connect to existing RTMCs in Districts 2 and 5. This work included assessing existing loads and branch circuits available at the District 4 and 6 Traffic Management Center (TMC) and added the necessary electric branch circuits and breakers at panel boards within these TMC to accommodate the network equipment. Project also included modifications of FDOT sites between Miami-Dade and Orange County, along the Florida Turnpike to add necessary network equipment to facilitate connectivity to District 5, as well as FDOT sites to connect to District 2. e. (1) TITLE AND LOCATION (City and State) Dodge Island North Cruise Boulevard Roadway Lighting Design | Miami-Dade County, FL YEARS COMPLETED PROFESSIONAL SERVICES N/A CONSTRUCTION (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm ITS Engineer Under PB Farradyne provided electrical power distribution design for two miles of roadway lighting at the Port of Miami Dodge Island, along North Cruise Boulevard previously called Eastern Port Boulevard, and provided utility power coordination with Florida Power & Light Company. STANDARD FORM 330 (REV. 3/2013) PAGE 2 2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME: Richard Lopez 13. ROLE IN THIS CONTRACT: Lighting 14. YEARS EXPERIENCE a. TOTAL: 37 b. WITH CURRENT FIRM: 3 15. FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 16. EDUCATION (Degree and Specialization): 1981 - Bachelor of Science in Electrical Engineering - University of Miami 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) N/A 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): Association of Energy Engineers-Member, Electrical Power Research Institute-Member, Institute of Electrical and Electronics Engineers-Member, National Fire Protection Association-Member, Quality Magazine Advisory Board-Member, South Florida Association of Engineers-Member. Certified Energy Manager. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) 16-Inch Force Main and Lift Station Improvements- Miami-Dade School Board, Miami, FL YEARS COMPLETED PROFESSIONAL SERVICES 2007 CONSTRUCTION TBD (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Manager Responsible for the installation of a 16-inch force main and lift station for Miami-Dade School Board Bus Maintenance Facility at NW 137th Ave and NW 6th Street. b. (1) TITLE AND LOCATION (City and State) 72nd Ave. For SR 826/Sr836 Interchange Improvements (Water and Wastewater) - Miami-Dade Expressway Authority, Miami, FL YEARS COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION TBD (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Sr. Project Manager who oversaw the relocation of a 16-inch water main and a 48-inch force main. c. (1) TITLE AND LOCATION (City and State) 72-Inch Force Main Relocation - Miami-Dade Expressway Authority, Miami, FL YEARS COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION TBD (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Liason Project Manager for JPA 72-inch Force Main relocation for MDX/FDOT at NW 72nd Avenue and NW 8th Street. d. (1) TITLE AND LOCATION (City and State) Section 5 Interchange 48- Inch Force Main Improvement - Miami-Dade Expressway Authority, Miami, FL YEARS COMPLETED PROFESSIONAL SERVICES 2014 CONSTRUCTION TBD (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Construction Project Manager as part of its general Engineering Consultant contract with Miami Dade Expressway Authority, was charged with the programming and management of the design services for the relocation of a 48-inch PCCP Forcemain and installation of a 36-inch force main as part SR 826/SR 836 interchange improvements. The project includes two canal crossings under proposed culverts; furnishing and installing steel casings, resilient wedge gate valves, plug valves; furnishing and installing approximately 3000 LF of 48-inch ductile iron and PCCP pipe and fittings, valves and fittings of various sizes for water main, sanitary sewer and sewage force main; making connection to existing mains with tapping sleeves and valves or solid sleeves; air release and flushing valve outlet assemblies; furnishing and installing castings. The project also includes making connections to existing mains at low flow periods within the time determined by the MD WASD; dewatering existing mains; cleaning, testing and disinfecting the mains; temporary and permanent repairs; curb and gutter restoration; sidewalk restoration; furnishing additional suitable backfill materials; and all other appurtenant and miscellaneous items and work for a complete and fully functional installation. e. (1) TITLE AND LOCATION (City and State) 72-Inch Force Main Improvements - Miami-Dade Expressway Authority, Miami, FL YEARS COMPLETED PROFESSIONAL SERVICES 1986 CONSTRUCTION 1988 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Liason Project Manager responsible for the installation of a 72-inch force main for MDWASD from 127th Avenue to 137th Avenue. STANDARD FORM 330 (REV. 3/2013) PAGE 2 2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME: Sergio Besu, C.G.C. 13. ROLE IN THIS CONTRACT: CEI/Construction Administration/Construction Management Services 14. YEARS EXPERIENCE a. TOTAL: 33 b. WITH CURRENT FIRM: 11 15. FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Suite 410, Miami, FL 33126 16. EDUCATION (Degree and Specialization): 1977 – United States Navy C.E.C Office School – Port Hueneme, CA Public Works Management, Contract Administration 1976 – B.S. Civil Engineering – University of Detroit, Michigan 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Florida – Certified General Contractor - No. 049682 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Biscayne Point Neighborhood Infrastructure Improvement. - City of Miami Beach, FL YEARS COMPLETED PROFESSIONAL SERVICES 2006 CONSTRUCTION 2013 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Administrator for this project that encompasses targeted potable water distribution and roadway/streetscape improvements. The project requires the design of approximately 19,000 LF of pressurized DIP water mains from 8-inch to 16-inch and service connections to homes of more than 500 residents in Miami Beach. The project involved the restoration and enhancement of streetscapes and infrastructure, consistent with existing available master plans, qualified decisions of applicable City dept., and community preferences. It also included portable water infrastructure, stormwater and restoration and enhancement of the neighborhood’s hardscape, streetscape, irrigation, and lighting. b. (1) TITLE AND LOCATION (City and State) Pine Island Road from Oakland Park Boulevard to Commercial Boulevard – Sunrise, FL YEARS COMPLETED PROFESSIONAL SERVICES 2008 CONSTRUCTION 2010 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Administrator responsible for responding to RFI’s, change orders, pay requests and plan interpretation for this project involving the reconstruction and widening of the existing 4-lane facility, to a 6-lane divided facility including bike lanes, sidewalk, 30-inch ductile iron (DIP) water main, drainage system, street lighting, signalization, landscaping, irrigation system, signing and pavement markings. c. (1) TITLE AND LOCATION (City and State) NW 21st Avenue from NW 19th Street to Oakland Park Boulevard – Fort Lauderdale, FL YEARS COMPLETED PROFESSIONAL SERVICES 2009 CONSTRUCTION 2011 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Senior Roadway Inspector / Project Administrator responsible for responding to RFI’s, Change Orders, Pay Requests plan interpretation, field inspections for this project involving the reconstruction of the existing 3-lane facility, including bike lanes, sidewalk, 8-inch ductile iron (DIP) water main, 6-inch force main, drainage system including jacked 72” RCP under the CSX R/R, asphalt paving, street lighting, upgrading the signalization system, landscaping, irrigation system, signing and pavement markings. d. (1) TITLE AND LOCATION (City and State) Sunrise Boulevard from Hiatus Road to Pine Island Road - Plantation, FL YEARS COMPLETED PROFESSIONAL SERVICES 2007 CONSTRUCTION 2009 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Project Administrator responsible for responding to RFI’s and plan interpretation. Widening and overbuild of an existing 4-lane divided facility to a 6-lane divided facility, including sidewalk, subsoil excavation, drainage, signalization, street lighting, landscaping, irrigation and signing & pavement markings. e. (1) TITLE AND LOCATION (City and State) 145th Avenue / Pembroke Road – Miramar, FL YEARS COMPLETED PROFESSIONAL SERVICES 2003 CONSTRUCTION 2005 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Administrator responsible for approving pay requests and shop drawings Mr. Labelle responds to RFIs and change orders, plan interpretation and correspondence, and also oversee removal of unsuitable material. STANDARD FORM 330 (REV. 3/2013) PAGE 2 2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME: Jeffery LaBelle 13. ROLE IN THIS CONTRACT: CEI/Construction Administration/Construction Management Services 14. YEARS EXPERIENCE a. TOTAL: 35 b. WITH CURRENT FIRM: 3 15. FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Suite 410, Miami, FL 33126 16. EDUCATION (Degree and Specialization): Nova High School, Davie, FL 1976 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) N/A 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Adriana Savino-Miller Principal - Master Planning a. TOTAL b. WITH CURRENT FIRM 30 26 15. FIRM NAME AND LOCATION (City and State) Savino & Miller Design Studio, P.A., North Miami, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION)17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) University of Pennsylvania, M. Arch + Urban Design Certificate Universidad Central de Venezuela, Architecture Registered Architect, Florida AR#14444 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) AIA Member 12 FLASLA Awards, among others 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED City of Miami Beach Future Community Park Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2016-present (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm Landscape Master Plan for this future community park project in Miami Beach. Scope included Paving, Planting, Site furniture and lighting. Principal - Master Planning b. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED Miami Baywalk & Riverwalk Design Guidelines Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2017-2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Design Guidelines and Brand Development for the Miami Baywalk and Riverwalk in Greater Downtown Miami Principal - Urban Designer c. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED Matheson Plantation Village Key Biscayne, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Master plan through the restoration of three historic cottages, a reminiscence of Key Biscayne when the Matheson Family donated land to the County. The plan calls for a sustainable village that exemplifies cultivation, conservation and stewardship of the land with activities that recall Key Biscayne’s past, including the zoo, first introduced by the Mathesons. Associate d. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED Museum Park Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2015 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Downtown Miami waterfront 20-acre park adjacent to two museums. $10M construction cost Principal - Master Planning e. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED Tamiami Canal Tender House Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2013 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmSite analysis and presentation of multiple options for site design, including whether to remove or replace the historic swing bridge, how many lanes for new bridge and relocation of tender house. Design of new tender house and bridge railing. Design Architect and Urban Designer E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Barry R. Miller, ASLA Principal in Charge a. TOTAL b. WITH CURRENT FIRM 34 26 15. FIRM NAME AND LOCATION (City and State) Savino & Miller Design Studio, P.A., North Miami, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION)17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) University of Florida ( Master Of Urban and Regional Planning) University of Florida (Bachelor in Landscape Architecture) Registered Landsape Architect: Florida #866 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) ASLA and ULI Member 12 FLASLA Awards, among other awards 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED Miami Baywalk & Riverwalk Design Guidelines Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2017-2019 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm Design Guidelines and Brand Development for the Miami Baywalk and Riverwalk in Greater Downtown Miami Principal - Landscape Architect b. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED Miami Beach Multi-Purpose Facility, 17 to 18 ST & Meridian AV Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2010 2012 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm Located adjacent to City Hall in the City of Miami Beach, scope included a Landscape and Streetscape Master plan linking new garage, City Hall and existing office building, through a bamboo promenade, an plaza, with a water feature. Scope included design of Paving, Planting, Water Feature, Lighting and urban furniture. From Schematic Design through Construction Phase Services.(19 Acres) Cost: $10M. Principal in Charge. 2015 FL ASLA Award of Merit. c. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETEDAventura Optima Professional Building Aventura, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2011 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm Landscape Master Plan and two green roof terraces. This is one of 2 buildings in South Florida to obtain Leed Platinum. Scope inluded Landscape plan, Hard-surface, Water Features, Outdoor lighting. From Schematic Design through Construction Phase Services.(19 Acres) Cost: $10M. Principal in Charge. 2015 FL ASLA Award of Merit.2015 Award of Excellence for Green Roof by Green Roof for Healthy Cities (NYC) d. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED SLS (Ritz Plaza Hotel) Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2012 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm Landscape Master Plan that included an entry courtyard with swimming pool and pool deck design . Planting, lighting, irrigation. From schematic Design thru Construction Phase Services.(19 Acres) Cost: $10M. Principal in Charge. e. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED Museum Park Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2012 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm Re-designed and valued engineered proposed Bay-walk and Entry promenade to keep integrity of original Concept. Scope included Paving, Planting, Irrigation, Urban furniture and lighting. From Schematic Design through Construction Observation Phase. (19 Acres) Cost: $10M. Principal in Charge. 2015 FL ASLA Award of Merit. 12. NAME 13. ROLE IN THIS CONTRACT 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE b. WITH CURRENT FIRMa. TOTAL 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) 15. FIRM NAME AND LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 2 a. b. c. d. (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) e. Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Soheila Sadough ASA Consultants, Inc. - Surise Florida M.S.C.E, University of Alabama (1983) B.S.C.E. University of Alabama (1981) I-95 3C Design-Build Design-Build project with Demoya Archer western Joint Venture; ASA is working on five bridges (Steel Box Girders)within SR 84 Interchange; Ms Sadough is Structural EOR for these five bridges. This Design-Build project with Astaldi Construction provide access to and from NB and SB I-95 as well as Yamato Road to Spanish River Blvd which will improve access to FAU campus and relieve traffic on the adjacent Glades Rd & Congress Ave Interchanges. Ms. Sadough was the Structural Engineer of record for this design-Build project with Community Asphalt involving the replacement of existing bridges over FEC RR & Old Dixie Highway. ASA, as a Subconsultant to A2B, is performing quality control of plans & design calculations for Area 2-Downtown bridges. SR 9/I-95 Spanish River Blvd. Interchange Improvements Design-Build SR5/US1 Reconstruction & Widening Design-Build Project -4 Ultimate Design-Build Project Florida PE No. 44130 30 5 ✔ ✔ 2018 0n going 2016 2017 2014 20182017 2015 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Carlos M. Rodriguez, PE a. TOTAL b. WITH CURRENT FIRM 10 5 Years 15. FIRM NAME AND LOCATION (City and State) ASA CONSULTANTS, INC. Sunrise, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) MSCE, Florida International University Florida PE No. 79134 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) FDOT Specifications Training 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (County) (2) YEAR COMPLETED SR9/ I-95 3C Design-Build Project, FDOT-D4 (Broward County) PROFESSIONAL SERVICES CONSTRUCTION (if applicable) On Going (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒ Check if project performed with current firm This Design-Build project with Archer Western & Demoya provides access from I-595 to I-95 express lanes. ASA Consultants is sub consultant to BCC is Structures EOR for five Bridges within I-95/ SR 84 Interchange. Mr. Rodriguez serves as a Project Engineer. b. (1) TITLE AND LOCATION (County) (2) YEAR COMPLETED Golden Gates Estates 8th Street NE DB Project | FDOT D1 – (FM 431895- 1) (Collier County) PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2 years 2018 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒ Check if project performed with current firm ASA is the prime on this DB with Bergeron. This project involves widening the existing road and a new bridge (using the developmental PSU beams) over the cypress canal. Mr. Rodriguez is the roadway Engineer of Record c. (1) TITLE AND LOCATION (County) (2) YEAR COMPLETED SR 9/I-95 Spanish River Blvd. Interchange Improvements Design-Build Project l FDOT D4 ( Broward County) PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 3 Years 2016 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒ Check if project performed with current firm This Design-Build project with Astaldi Construction provides access to and from NB and SB I-95 as well as Yamato Road to Spanish River Boulevard which will improve access to FAU campus and relieve traffic on the adjacent Glades Road & Congress Avenue Interchanges. The project requires extensive coordination with FAA, CSX and other local agencies. Ms. Sadough is Structures EOR & Project Manager responsible for all design and coordination with FDOT and the contractor during the various phases of plans preparation and is providing construction support services during construction. Mr. Rodriguez served as a Project Engineer. d. (1) TITLE AND LOCATION (County) (2) YEAR COMPLETED SR 15 RRR Project (Palm Beach County) PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2 Years (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☐ Check if project performed with current firm ASA serves as a sub to Propel which involves widening, milling and resurfacing and new guardrail along the project limits. Mr. Rodriguez was responsible for the Pavement Design. e. (1) TITLE AND LOCATION (County) (2) YEAR COMPLETED DW Misc. PE Design Services, FDOT D6 (Miami-Dade County) PROFESSIONAL SERVICES CONSTRUCTION (if applicable) On Going (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒ Check if project performed with current firm DW MISC. PE Design (Prime) Mr. Rodriguez serves as the roadway Engineer of Record for multiple Task Work Orders 12. NAME 13. ROLE IN THIS CONTRACT 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE b. WITH CURRENT FIRMa. TOTAL 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) 15. FIRM NAME AND LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 2 a. b. c. d. (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) e. Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Adrian Leon Bridge Inspector 10 1 LARS Engineering, Inc. Miami, Florida Florida International University BS in Civil Engineering, 2010 Professional Engineer Reg. No. 83827 Certified Bridge Inspector (CBI) No. 00513, Certified Tunnel Inspector (CTI) No. 00014, NHI Safety Inspection of In-Service Bridges, NHI Fracture Critical Inspection for Steel Bridges, NHI Inspection and Maintenance of Ancillary Hwy Structures. Hard Rock Stadium Pedestrian Bridge No 2 Inspection and Report Miami Gardens, Florida 2019 N/A Lead Inspector & EOR for the structural inspection and report processing for the 207' Single Span Pedestrian Bridge No. 2 in compliance with National Bridge Inspection Standards, CFR Title 23, Part 650, Subpart C; Section 335.074, Florida Statutes; Safety Inspections of Bridges; and State of FDOT Rules, Chapter 14-48, F.A.C., Bridge Inspection Standards. 2019 N/A Project Manager and Lead Inspector. This contract includes 177 Overhead Signs to be inspected within 2-year period. LARS is responsible for the visual structural inspections for various types of overhead signs including bridge signs, cantilever, butterfly and cable signs. Responsible for generating and submitting inspection reports in BrM and BMS, and contract management. 2019 N/A Lead Bridge Inspector. Performed inspection and report processing of 55 fixed spans over the Indian River as part of State Road 405, and a double leaf steel bascule main span including the prestressed concrete girder and composite slab approach system, driven prestressed concrete piles with cast in place concrete caps and the electrical and mechanical systems. Districtwide Local Government In-Depth Bridge Inspection FDOT D6, Miami, FL 2011 to 2019 N/A Project Manager and Bridge Lead Inspector responsible for performing visual routine, interim, and initial inspections for various types of bridges including but not limited to movable and steel bridges. This contract includes the inspection of 365 structures (including 10 movable bridges) with reporting in BrM and BMS as a Sub-Consultant to Marlin Engineering, Inc. MDX Inspection and Reporting Services, Miami, FL 2016 to 2019 N/A Project Manager and Lead Inspector performing bridge and ancillary structure inspections and reporting for structures under MDX jurisdiction to comply with Federal Regulations, Florida Statutes and OSHA as a Sub-Consultant to Marlin Engineering, Inc. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Carlos Francis Senior Traffic Engineer a. TOTAL b. WITH CURRENT FIRM 27 4.5 15. FIRM NAME AND LOCATION (City and State) Choice Engineering Consultants (Miami, FL) 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) BS in Civil Engineering Professional Engineer No. 51364 (Florida) Professional Traffic Operations Engineer (Florida) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (County) (2) YEAR COMPLETED Miscellaneous Studies & RCI Data FM No: 249726-6-32-01 (Miami-Dade) PROFESSIONAL SERVICES CONSTRUCTION (if applicable) Ongoing since 2018 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒ Check if project performed with current firm Subconsultant responsible for providing traffic engineering services to produce traffic engineering studies (including traffi c data collection) to support the Traffic Operations Office. Recent efforts include the production of Bottleneck Studies along SR 5/Biscayne Boulevard and also along SR 826/NW 167 Street. Scope for these studies included field reviews, data collection, VISSIM simulation, develop ment of recommendations and documentation in report format. b. (1) TITLE AND LOCATION (County) (2) YEAR COMPLETED Traffic Operations Studies FM No.: 409521-6-32-01 (Miami-Dade) PROFESSIONAL SERVICES CONSTRUCTION (if applicable) Ongoing since 2017 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒ Check if project performed with current firm Serving as the Project Manager responsible for the overall management and performance of traffic engineering services to prod uce operational studies and other traffic engineering studies (including traffic data collection) to support the Traffic Operations Office and address citizen complaints. c. (1) TITLE AND LOCATION (County) (2) YEAR COMPLETED Traffic Operations / Safety Studies FM No.: 414052-2-32-01 (Miami-Dade) PROFESSIONAL SERVICES CONSTRUCTION (if applicable) Ongoing since 2016 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒ Check if project performed with current firm Project Engineer providing traffic engineering services to produce safety studies, fatal crash review (both office and field based), RRR safety reviews, Road Safety Audits, and traffic engineering studies (including traffic data collection) to support the Hazard Reduction Program, the Safe Routes To School Program, and further the Strategic Highway Safety Plan. May represent the Traffic Operations Office for the Rail Diagnostic field reviews and study development. d. (1) TITLE AND LOCATION (County) (2) YEAR COMPLETED Traffic Operations Plans & Permit Reviews FM NO.: 415239-2-32-01 (Miami-Dade) PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2015 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☐ Check if project performed with current firm Served as a sub-consultant Sr. Traffic Engineer providing plans review, permit reviews of both traffic impact studies and plans, traffic report review, scoping report review from a traffic operations perspect ive. Also performed miscellaneous studies to address Citizens complaints including an operational analysis to evaluate the need for a U -turn restriction at a signalized intersection. e. (1) TITLE AND LOCATION (County) (2) YEAR COMPLETED Traffic Operations / Safety Studies Consultant (Broward) PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2005 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☐ Check if project performed with current firm Project Manager providing traffic engineering services to produce safety studies, plans review, and traffic engineering studi es to support the Hazard Reduction Program. These study efforts included operational analysis using both the HCS and SYNCHRO software, traffic signal timing/phasing plan development, cost estimating and benefit/cost analysis efforts. RRR Safety Reviews were performed at mult iple locations. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Eugenio Lopez Traffic Engineer a. TOTAL b. WITH CURRENT FIRM 17 4 15. FIRM NAME AND LOCATION (City and State) Choice Engineering Consultants (Miami, FL) 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) MS in Civil Engineering Professional Engineer No. 68213 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 2019 Intersection Control Evaluation (ICE) Training for Analysts 2019 Intersection Control Evaluation (ICE) Training for Managers/Approvers 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (County) (2) YEAR COMPLETED Traffic Operations / Safety Studies FM No.: 414052-2-32-01 (Miami-Dade) PROFESSIONAL SERVICES CONSTRUCTION (if applicable) Ongoing since 2016 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒ Check if project performed with current firm Project Manager providing traffic engineering services to produce safety studies, office based fatal crash review, field base d fatal crash reviews, RRR safety reviews, Road Safety Audits, Signal Warrant Analysis, Qualitative Analysis reports, Technical Memorandums, and overall traffic engineering studies (including traffic data collection) to support the Hazard Reduction Program, the Safe Rou tes To School Program, and further the Strategic Highway Safety Plan. b. (1) TITLE AND LOCATION (County) (2) YEAR COMPLETED Traffic Operations Studies Consultant (Miami-Dade) PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2015 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☐ Check if project performed with current firm Transportation Engineer. Professional services for various traffic operation and safety studies, including Road Safety Audits at locations throughout the District. The work addresses safety concerns identified through reviews of FDOT’s Crash Analysis Reporting System as well as requests from citizens or elected officials. c. (1) TITLE AND LOCATION (County) (2) YEAR COMPLETED Traffic Operations Studies FM No.: 409521-3-32-01 (Miami-Dade) PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☐ Check if project performed with current firm Served as a sub-consultant Traffic Engineer providing traffic engineering and data collection services to produce operational studies, to support the Traffic Operations Office Citizen Tracking Program . d. (1) TITLE AND LOCATION (County) (2) YEAR COMPLETED Traffic Operations / Safety Studies FM No.: 249796-3-32-01 (Miami-Dade) PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☐ Check if project performed with current firm Traffic Engineer providing traffic engineering services to produce safety studies, plans review, and traffic engineering stud ies (including traffic data collection) to support the Hazard Reduction Program and the Safe Routes to School Program. RRR Safety R eviews were performed at multiple locations. Represented the Traffic Operations Office for the Rail Diagnostic field reviews and study de velopment. e. (1) TITLE AND LOCATION (County) (2) YEAR COMPLETED NW 74th Street SIS/NHS Connector Traffic Study (Miami-Dade) PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☐ Check if project performed with current firm Traffic Engineer responsible for providing traffic engineering services in the preparation of a conceptual design analysis to identify potential short- and long-term capacity, access, operational, and safety improvements in the vicinity of the NW 74 Street SIS/NHS Connector to the FEC Hialeah Rail Yard that will benefit the movement of freight and goods. E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME Manuel G. Vera, Jr., PSM 13.ROLE IN THIS CONTRACT Principal / Chief Surveyor 14. YEARS EXPERIENCE a.TOTAL 36 b.WITH CURRENT FIRM 36 15.FIRM NAME AND LOCATION (City and State) Manuel G. Vera & Associates, Inc. Miami, FL 16.EDUCATION (Degree and Specialization) BS, Legal Studies, Nova Southeastern University, 1994 AS, Land Surveying, Miami Dade College, 1988 17.CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Surveyor & Mapper, Florida, PSM#5291 (1994) 18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Vera Jr. is a registered Land Surveyor with over 36 years of experience with the company and throughout the state of Florida, and has managed a variety of survey contracts and projects for the Florida Department of Transportation, Miami-Dade County, Miami- Dade Expressway Authority, City of Miami, and numerous Engineering and Design firms. He has performed and managed all types of surveying services including: Design Surveys, Right-of-Way Control Surveys, Right-of-Way Mapping, Platting, Construction Layout, As-built Surveys, Drainage Surveys, etc. Mr. Vera is a Senior Surveyor and Mapper as well as our Senior Project Manager. He has extensive experience in the management and coordination of survey projects involving a variety of surveying techniques such as Aerial Surveys, Conventional Ground Surveying, Utilities designation, etc. Professional Affiliation: FL Surveying & Mapping Society 19.RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) SR A1A / Collins Avenue at 174th Street Pedestrian Bridge FDOT District 6 (Miami-Dade County, FL) (2) YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (If applicable) N/A (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm Chief Surveyor | MGV was responsible for providing a Design Survey consisting of the following deliverables: the establishment of horizontal (NAD 83/90) control as needed, and the creation of Topographic at the intersection of US-1 and 174th Street. All trees were located and identified with common names. Survey Cost: 3,000.00 b. (1)TITLE AND LOCATION (City and State) Pedestrian Bridge over Adams Cut FDOT District 6 (Key Largo, FL) (2) YEAR COMPLETED PROFESSIONAL SERVICES 2013 CONSTRUCTION (If applicable) N/A (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm Project Manager | MGV was to prepare a complete Design survey which included the establishment of horizontal (NAD 83/90) and vertical control (NAVD 88) networks, survey baseline and right of way, and the creation of Topographic surveys and Digital Terrain Model (DTM/3D). Survey Cost: $4,974.00 c. (1)TITLE AND LOCATION (City and State) Districtwide Right of Way Mapping & Survey (C-9M05) FDOT District 6 (Miami-Dade and Monroe County, FL) (2) YEAR COMPLETED PROFESSIONAL SERVICES On-Going CONSTRUCTION (If applicable) N/A (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm Project Manager | Task driven contract performing miscellaneous survey tasks in Miami-Dade and Monroe Counties, and all municipalities within the district. Recent tasks for Right of Way Mapping and Surveying services have included the preparation of Right of Way Control Surveys, Right of Way Control Maps, Right of Way Surveys, Right of Way Maps, Boundary Surveys, Geographic Information System (GIS) Mapping, preparation of Parcel Sketches and Legal Descriptions, Quality Assurance Reviews, Title Searches, Title Search Review, plotting Legal Descriptions, and miscellaneous surveying and mapping. Right of Way surveys may include, but not be limited to, the following: Geodetic Control / Project Network Control (PNC), Alignments, Section Ties, Subdivision Ties, Maintained Right of Way Survey, Building Ties, Jurisdictional Line Survey, and Side Street Surveys. $1.5 Million d. (1)TITLE AND LOCATION (City and State) Districtwide Continuing Services for Survey, Mapping, and SUE (C-9T24) FDOT District 4 (Districtwide: Broward, Martin, Indian River, Palm Beach & St. Lucie County FL) (2) YEAR COMPLETED PROFESSIONAL SERVICES On-Going CONSTRUCTION (If applicable) N/A (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm Assistant Project Manager | Task driven contract. Surveying and mapping services for this contract include: Mobile Lidar, Field Surveys, Maintenance of Traffic (MOT), Historical Baseline and Existing ROW Determination, Global Positioning System (GPS) Surveys, Monumentation Surveys, Bathymetric surveys (which includes single beam, multi beam and side scanner sonar capa- bilities), Utility Designation and Excavation (including Underwater Utilities), Tree Surveys, ROW Control Survey Maps, ROW Maps, Maintenance Maps, ROW Monumentation Maps, Boundary Surveys, Quality Assurance Reviews, Expert Witness Testimony, Title Search Plotting Maps, Title Document Review and Analysis, Sketched, Parcel Staking, and Legal Descriptions. $5 Million e. (1)TITLE AND LOCATION (City and State) Districtwide Right of Way Monumentation Consultant Contract (C-A146) FDOT District 6 (Miami-Dade and Monroe County, FL) (2) YEAR COMPLETED PROFESSIONAL SERVICES On-Going CONSTRUCTION (If applicable) N/A (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm Principal in Charge / QA/QC | Task driven contract performing Right of Way Monumentation and Right of Way Monumentation Mapping services in Miami-Dade and Monroe Counties, and all municipalities within the district. These services include, but are not limited to the preparation of Right of Way Control Surveys, Right of Way Maps, Boundary Surveys, Title Search Reviews, and Right of Way Monumentation to include annotation and recordation of Right of Way Maps once the Monumentation is complete. $1.5 Million STANDARD FORM 330 (REV. 8/2016) PAGE 2 E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME Mark R. Sowers, PSM 13.ROLE IN THIS CONTRACT SUE Director / Chief Surveyor 14. YEARS EXPERIENCE a.TOTAL 32 b.WITH CURRENT FIRM 4 15.FIRM NAME AND LOCATION (City and State) Manuel G. Vera & Associates, Inc. Jupiter, FL 16.EDUCATION (Degree and Specialization) BS, Land Surveying, University of Florida, 1988 17.CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Surveyor & Mapper, Florida, PSM#5266 (1993)18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Sowers is a Professional Surveyor & Mapper with 32 years of experience throughout the state of Florida. His responsibilities include managing field operations and establishing standards for consultants as well as final quality assurance / quality control of all deliverables before client submission. He is proficient in the latest industry technology, as well as developing and implementing successful management strategies. Mr. Sowers worked for the Florida Department of Transportation (FDOT), District IV for eight years, four of them as District Surveyor. During his FDOT tenure, Mr. Sowers actively participated in statewide process improvements. He was a chairperson for FDOT’s Survey Technical Advisory Committee and a member of the committees responsible for the development and implementation of the staff-hour estimating form and project network control sheet. Professional Affiliation: Florida Surveying & Mapping Society 19.RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) SR A1A / Collins Avenue at 174th Street Pedestrian Bridge FDOT District 6 (Miami-Dade County, FL) (2) YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (If applicable) N/A (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm Chief Surveyor | MGV was responsible for providing a Design Survey consisting of the following deliverables: the establishment of horizontal (NAD 83/90) control as needed, and the creation of Topographic at the intersection of US-1 and 174th Street. All trees were located and identified with common names. Survey Cost: 3,000.00 b. (1)TITLE AND LOCATION (City and State) Districtwide Right of Way Mapping & Survey (C-9M05) FDOT District 6 (Miami-Dade and Monroe County, FL) (2) YEAR COMPLETED PROFESSIONAL SERVICES On-Going CONSTRUCTION (If applicable) N/A (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm Chief Surveyor | Task driven contract performing miscellaneous survey tasks in Miami-Dade and Monroe Counties, and all municipalities within the district. Recent tasks for Right of Way Mapping and Surveying services have included the preparation of Right of Way Control Surveys, Right of Way Control Maps, Right of Way Surveys, Right of Way Maps, Boundary Surveys, Geographic Information System (GIS) Mapping, preparation of Parcel Sketches and Legal Descriptions, Quality Assurance Reviews, Title Searches, Title Search Review, plotting Legal Descriptions, and miscellaneous surveying and mapping. Right of Way surveys may include, but not be limited to, the following: Geodetic Control / Project Network Control (PNC), Alignments, Section Ties, Subdivision Ties, Maintained Right of Way Survey, Building Ties, Jurisdictional Line Survey, and Side Street Surveys. $1.5 Million c. (1)TITLE AND LOCATION (City and State) Districtwide Continuing Services for Survey, Mapping, and SUE (C-9T24) FDOT District 4 (Districtwide: Broward, Martin, Indian River, Palm Beach & St. Lucie County FL) (2) YEAR COMPLETED PROFESSIONAL SERVICES On-Going CONSTRUCTION (If applicable) N/A (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm Project Manager | Task driven contract. Surveying and mapping services for this contract include: Mobile Lidar, Field Surveys, Maintenance of Traffic (MOT), Historical Baseline and Existing ROW Determination, Global Positioning System (GPS) Surveys, Monumentation Surveys, Bathymetric surveys (which includes single beam, multi beam and side scanner sonar capa-bilities), Utility Designation and Excavation (including Underwater Utilities), Tree Surveys, ROW Control Survey Maps, ROW Maps, Maintenance Maps, ROW Monumentation Maps, Boundary Surveys, Quality Assurance Reviews, Expert Witness Testimony, Title Search Plotting Maps, Title Document Review and Analysis, Sketched, Parcel Staking, and Legal Descriptions. $5Million d. (1)TITLE AND LOCATION (City and State) Districtwide Right of Way Monumentation Consultant Contract (C-A146) FDOT District 6 (Miami-Dade and Monroe County, FL) (2) YEAR COMPLETED PROFESSIONAL SERVICES On-Going CONSTRUCTION (If applicable) N/A (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm Chief Surveyor | Task driven contract performing Right of Way Monumentation and Right of Way Monumentation Mapping services in Miami-Dade and Monroe Counties, and all municipalities within the district. These services include, but are not limited to the preparation of Right of Way Control Surveys, Right of Way Maps, Boundary Surveys, Title Search Reviews, and Right of Way Monumentation to include annotation and recordation of Right of Way Maps once the Monumentation is complete. $1.5 Million e. (1)TITLE AND LOCATION (City and State) Districtwide Right of Way Monumentation Consultant Contract (C-9D05) FDOT District 6 (Miami-Dade and Monroe County, FL) (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) N/A (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm Chief Surveyor | Task driven contract performing miscellaneous Location Surveys in Miami-Dade and Monroe Counties, and all municipalities within the district. MGV is responsible for the performance of Right of Way Monumentation and Right of Way Monumentation Mapping services. These services include, but are not limited to the preparation of Right of Way Control Surveys, Right of Way Maps, Boundary Surveys, Title Search Reviews, and Right of Way Monumentation to include annotation and recordation of Right of Way Maps once the Monumentation is complete. $1.5 Million STANDARD FORM 330 (REV. 8/2016) PAGE 2 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Oracio Riccobono, P.E. Geotechnical Engineer A. TOTAL B. WITH CURRENT FIRM 31 12 15. FIRM NAME AND LOCATION (City and State) GEOSOL, Inc.; 5795-A NW 151st Street, Miami Lakes, FL 33014 16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Civil Engineer (BSCE, 1983), Master Degree (MSCE in Geotechnical Engineering, 1985) at Louisiana State University and Master in Business Administration (MBA, 2000) at Florida International University Registration No. 49324 (Florida, Civil Engineering) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) American Society of Civil Engineers Florida Engineering Society 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Areawide and Districtwide Geotechnical Consultant, FDOT Districts 4 and 6, over from Monroe to Osceola Counties PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2012 – 2019 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Geotechnical Engineer responsible for negotiating each task work orders (TWO), planning the geotechnical exploration and laboratory testing programs, preparation of geotechnical engineering reports with foundation design and construction recommendations for new and existing roadway projects during Preliminary and Final Design phases. Project has budget cap of $1.50 millions. To date, we have successfully executed 450 TWO and have spent $3.0 millions. b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED City of Doral Tile District Drainage Study, Doral, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2014 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Geotechnical Engineer for the drainage study to identify improvements to reduce recurring flooding in a low-lying commercial area. Responsibilities included compilation of existing geotechnical exploration including soil and water sampling to screen for volatile organics, ammonia, metals, lead, aluminum, and iron; delineation of areal extent of undocumented landfill dumping activities and contamination; conceptual design of alternatives; responsible for planning geotechnical exploration and laboratory testing programs, preparation of geotechnical engineering report with foundation design and construction recommendations. c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED City of Doral Basin H-8 Drainage Improvements Doral, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2016 2016 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Geotechnical Engineer Responsibilities included geotechnical exploration, and identification of utility conflicts as well as planning the geotechnical exploration and laboratory testing programs, preparation of the geotechnical engineering report for exfiltration trench design. d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SR 826 over NW 25th Street Viaduct, Doral, FL, FDOT District 6. PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2011 - 2013 2011 - 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Geotechnical Engineer responsible for planning geotechnical exploration and laboratory testing programs, preparation of geotechnical engineering report with foundation design and construction recommendations for the new bridge and retaining walls. Geotechnical fees were $250,000 e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED J.C. Bermudez Park Recycled Stormwater Irrigation Project. Doral, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2010 2010 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Geotechnical Engineer responsible for planning geotechnical exploration and laboratory testing programs, preparation of geotechnical engineering report with foundation design and construction recommendations for design of irrigation system for the 80-acre park. Major components included emergency lake intake structure, 2 MG above ground storage tank, 3,000 gpm storm water pump station, 130 micron disk filters with automatic backwash, bleach disinfection system, 1,400 gpm irrigation pumps, 8,000 feet of 12-inch diameter looped main, and irrigation system. STANDARD FORM 330 (6/2004) PAGE 2 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Adnan Ismail, P.E. Geotechnical Engineer A. TOTAL B. WITH CURRENT FIRM 13 13 15. FIRM NAME AND LOCATION (City and State) GEOSOL, Inc.; 5795-A NW 151st Street, Miami Lakes, FL 33014 16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) M.S., Civil Engineering, (Geotechnical), Florida International Univ., 2012 B.S., Civil Engineering, Florida International University, 2006 Registration No. 76014 (Florida, Civil Engineering) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) American Society of Civil Engineers Florida Engineering Society 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Areawide and Districtwide Geotechnical Consultant, FDOT Districts 4 and 6, over from Monroe to Osceola Counties PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2012 – 2019 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Geotechnical Engineer responsible for negotiating each task work orders (TWO), planning the geotechnical exploration and laboratory testing programs, preparation of geotechnical engineering reports with foundation design and construction recommendations for new and existing roadway projects during Preliminary and Final Design phases. Project has budget cap of $1.50 millions. To date, we have successfully executed 450 TWO and have spent $3.0 millions. b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Hard Rock Stadium Pedestrian Bridges Bridge #1 Over NW 199th St. & Bridge #2 Over Turnpike Access Rd., City of Miami Gardens, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2018 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Geotechnical Engineer responsible for planning geotechnical exploration and laboratory testing programs, preparation of geotechnical engineering report with foundation design and construction recommendations, foundation inspections, and foundation certifications. c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Pedestrian Bridge over US-1 Isla Morada, Monroe County, FL (FM: 442040-1) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2018 N/A (Scheduled for 2020) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Geotechnical Engineer responsible for planning geotechnical exploration and laboratory testing programs, preparation of geotechnical engineering report with foundation design and construction recommendations. d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SR 826 over NW 25th Street Viaduct, Doral, FL, FDOT District 6. PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2011 - 2013 2011 - 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Geotechnical Engineer responsible for planning geotechnical exploration and laboratory testing programs, preparation of geotechnical engineering report with foundation design and construction recommendations for the new bridge and retaining walls. Geotechnical fees were $250,000 e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED West Avenue Pedestrian Bridge and Lincoln Court Pedestrian Bridge Over the Collins Canal City of Miami Beach, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2016 2017 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Geotechnical Engineer responsible for planning geotechnical exploration and laboratory testing programs, preparation of geotechnical engineering report with foundation design and construction recommendations, foundation inspections, and foundation certifications. STANDARD FORM 330 (6/2004) PAGE 2 AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (6/2004) Page 25 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Gisele L. Colbert, MS, LEP 13. ROLE IN THIS CONTRACT Principal Scientist 14. YEARS EXPERIENCE a. TOTAL 25 b. WITH CURRENT FIRM 6 Years 15. FIRM NAME AND LOCATION (City and State) Smart-Sciences, Inc., Miami, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) M.S., Biology; Post Graduate Studies in Environmental Law/Toxicology; B.S., Biology (minor in Chemistry) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) FL Licensed Environmental Professional #25 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Ms. Colbert has more than 25 years of experience in managing and supervising technical projects and in leading inter-disciplinary teams consisting of engineers, geologists, ecologists and other technical experts. Ms. Colbert has extensive experience in all types of environmental permitting in the State of Florida (including Environmental Resource Permits (ERPs), Local Wetlands Permitting, Coastal Construction Permitting, Tree Permitting, Water Use Permit (WUP), industrial wastewater), as well as practical applications of wetland ecology and surface and groundwater hydrology in the South and Central Florida ecosystems. Her experience includes agency coordination, environmental permitting, wetland jurisdictional determinations and mitigation assessments, mitigation design and implementation, wetland monitoring and maintenance, benthic resource surveys, natural resource management, threatened and endangered species studies, habitat evaluation, conservation plans, water quality analysis, NEPA/PD&E environmental assessments, tree surveys, contamination assessments and remediation that consider both ecological and human health risks, GIS and training/teaching. Ms. Colbert is also a Licensed Environmental Professional and has performed numerous Phase I and II Environmental Site Assessments throughout the United States. Ms. Colbert has used this broad background and her project management skills to provide quality driven, technically sound solutions that meet the client’s needs in an efficient and cos- effective manner. Licensed Environmental Professional; Certified FDEP Stormwater, Erosion and Sedimentation Control Inspector; OSHA 40-Hour HAZWOPER/OSHA 8-HR Site Supervisor; PADI Open Water Diver; 40-Hour Course in Wetland Identification and Delineation (USACE Regulation IV program); and Florida UMAM Training, SFWMD, 2005 19. RELEVANT PROJECTS a. 1) TITLE AND LOCATION (City and State) Kendall Drive Rapid Transit PD&E, Environmental Studies 2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 - Ongoing CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm This PD&E Study entails improving operational capacity primarily along SR 94/Kendall Drive/SW 88 Street through the implementation of premium transit service and infrastructure (i.e., Bus Rapid Transit (BRT), Light Rail Transit (LRT), Heavy Rail Transit (HRT), 'Hybrid' HRT (Heavy Rail with power supplied by either third rail or overhead lines), and other appropriate transit modal technologies. SR 94/Kendall Drive/SW 88 Street is a state-owned and maintained divided arterial running in the east-west direction. Smart-Sciences is preparing the Wetland Evaluation Report (WER) and Endangered Species Biological Assessment (ESBA) for the 10.7-mile project corridor. While the corridor is primarily urban, western areas are outside the Miami-Dade County Urban Development Boundary. Ms. Colbert is the Principal-in-Charge responsible for QA/QC of the WER and ESBA to be incorporated into the PD&E. b. 1) TITLE AND LOCATION (City and State) FDOT D6 – SR 25/Okeechobee Road from Countyline to East of 117th Avenue, Environmental Permitting 2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 – Ongoing CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Smart-Sciences is working with project engineers to provide environmental services as required for FDOT District 6 SR 25/Okeechobee Road capacity improvement project within Miami-Dade County. Ms. Colbert is the environmental lead for this project. The project consists of traffic analysis and validation, capacity improvements to the mainline, Frontage Road, and entry/exit roads, along with milling and resurfacing. Smart- Sciences conducted GIS desktop analysis for listed species, contamination, and wetlands. Data harvesting was completed from PD&E study, South Florida Water Management District, United States Army Corps of Engineers, and Miami-Dade County data sources. Ms. Colbert led the wetland delineation along the corridor for direct and secondary impacts, in addition to functional assessments using Uniform Mitigation Assessment Method (UMAM). Smart-Sciences also assessed the project corridor for listed species and conducted preliminary surveys, i.e. wood stork and Florida bonneted bat. Staff prepared natural resources reports to support wetland permit applications and multi-agency coordination. Ms. Colbert conducted QA/QC of all work products. c. (1) TITLE AND LOCATION (City and State) City of Miami Beach, Neighborhood West, Phase I Environmental Site Assessment for Pump Station Improvements (2) YEAR COMPLETED PROFESSIONAL SERVICES 2014 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm project performed with current firm Ms. Colbert conducted a Phase I Environmental Site Assessment (ESA) in accordance with the ASTM standard E-1527-13 for the purpose of determining whether contamination may be present within the City’s right-of-way prior to replacing stormwater and wastewater pipes. The project is approximately 160 acres and is located between 5th Street and 20th Street and Alton Road to the Intracoastal in Miami Beach, Florida. The southern portion of the project area is a designated Brownfield Area historically known for automotive repair. The ESA activities included a site visit and reviews of historical Sanborn maps, city directories, aerial photographs, land use and regulatory records/database listings. The historic information gathered indicated that there were numerous drycleaners, gasoline stations, automotive repair shops and boat yards within the study area. The Phase I ESA identified twenty recognized environmental conditions, twenty-four historical recognized environmental conditions and one controlled recognized environmental condition in connection with the study area. This information is being used for planning purposes for stormwater and wastewater improvement projects within the City of Miami Beach. AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (6/2004) Page 26 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) d. 1) TITLE AND LOCATION (City and State) Hialeah Gardens Warehouse Development Environmental Permitting and Florida bonneted bat survey, Miami-Dade County (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 - Ongoing CONSTRUCTION (If applicable) N/A 3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Ms. Colbert was project manager working with engineers, planners and architects to prepare two commercial warehouse development plans (Hialeah Gardens One and Two) on vacant parcels totaling 60 acres in Hialeah Gardens. The parcels consist entirely of low quality wetland habitat. Ms. Colbert conducted the wetland delineation, listed species survey, alternative sites/avoidance and minimization analysis and mitigation assessment using WATER to determine the mitigation required for permitting. This information was used to prepare the Joint SFWMD/USACE ERP and the Miami-Dade County Class IV permit applications for site development. As part of the permitting process the US Fish and Wildlife Service requested a Florida bonneted bat survey. A pedestrian survey of the entire site was conducted to look for tall trees with crevices/snags or palms with an appropriate crownshaft for bat roosting. Trees that were found to contain features for potential roosts were located using a Global Positioning System (GPS) unit and further examined with use of the Tree Top Peeper™ inspection system. The base of these trees were also inspected for bat guano. Additionally, a pedestrian survey was conducted at sunset for monitoring of vocalizations of the FBB. There were no observations made or vocalizations heard indicating that the FBB would be present within the project site. e. 1) TITLE AND LOCATION (City and State) Doral White Course Mixed Use Development, Environmental, Florida Bonneted Bat and Tree Permitting Services, Doral, Miami-Dade County 2) YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Ms. Colbert was the Principal-In-Charge working with engineers, planners and architects to prepare multi-use residential and commercial development plans for this 130-acre site in the City of Doral. The project consisted of an abandoned golf course with water bodies and palisades of trees. Ms. Colbert led the wetland delineation, listed species survey and tree survey within the project area. Based on the assessment of the regulations as well as the plants, soils and hydrology, it was concluded that no jurisdictional wetlands were present on the property. Ms. Colbert was successful in working with the USACE, SFWMD and Miami-Dade County to agree with the findings for no jurisdictional wetlands. Ms. Colbert led a survey for the Florida Bonneted Bat (FBB) using Wildlife Acoustic Song Meters and conducting pedestrian surveys. Based on the data analysis the FBB is not utilizing the site to roost or forage. Ms. Colbert also provided guidance to the Client regarding wood stork and eastern indigo snake. Under Ms. Colbert’s guidance approximately 1,700 trees were identified, in addition to recording height, canopy spread, diameter at breast height (DBH), and overall condition for each of the trees. Tree inventory data was integrated into project design and a tree removal and relocation permit was obtained from Regulatory and Economic Resources (RER). AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (6/2004) Page 25 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Meike de Vringer, MS 13. ROLE IN THIS CONTRACT Staff Scientist, GIS Specialist 14. YEARS EXPERIENCE a. TOTAL 3 b. WITH CURRENT FIRM 2.25 15. FIRM NAME AND LOCATION(City and State) Smart-Sciences, Inc., Miami, FL 16. EDUCATION(DEGREE AND SPECIALIZATION) M.S., Earth Sciences (University of Amsterdam); B.S., Earth Sciences (Vrije Universiteit), Amsterdam, the Netherlands. 17. CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) OSHA 40-hour Health and Safety Training (2019) FDEP Stormwater Erosion and Sedimentation Control Inspector (2019) 18. OTHER PROFESSIONAL QUALIFICATIONS(Publications, Organizations, Training, Awards, etc.) Meike de Vringer has over three years of experience in ecological studies and Geographic Information Systems (GIS). Her ecological experience includes natural resource monitoring, pine rockland assessment, listed species surveys, acoustic recording analysis, wetland delineation, wetland functional assessments, tree surveys, exotic plant control and vegetative planning and planting. Ms. de Vringer has experience applying geographic analysis and technologies for GPS data conversion, processing high resolution imagery for analysis and basemap creation, natural resource management, vegetative planning and monitoring, evaluating habitat suitability of threatened and endangered species, remote sensing, and creating/managing geodatabases. Ms. de Vringer has experience conducting Phase I and II ESAs and routinely prepares applications for environmental permits to the USACE, SFWMD, FDEP and Miami-Dade County. Throughout the permitting process Ms. de Vringer coordinates with regulatory personnel to address questions and aid in moving the process along as expeditiously as possible. 19. RELEVANT PROJECTS a. 1) TITLE AND LOCATION (City and State) Vizcaya South Canal Restoration, Miami, Miami-Dade County, FL 2) YEAR COMPLETED PROFESSIONAL SERVICES 2018-Ongoing CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Smart-Sciences is providing environmental permitting services and contractor bidding coordination to the restoration of Vizcaya Museum and Gardens’ South Canal. To restore historic hydrologic conditions and enhance habitat for wildlife within the South Canal, dredging of approximately 1,100 cubic yards of accumulated sediment and trimming of mangroves is needed. Smart-Sciences is obtaining relevant permits from the USACE and Miami-Dade County to perform the dredging and mangrove trimming. Smart-Sciences prepared a bids package and obtained two bids from subcontractors. During coordination with subcontractors it was deemed desirable to analyze sediment prior to dredging for heavy metal content. Smart-Sciences prepared a Sediment Sampling Plan for review by Miami-Dade County Pollution Remediation Section. Ms. de Vringer coordinated with subcontractors at the Site and prepared the Sediment Sampling Plan. Ms. de Vringer conducted sediment sampling prior to dredging activities and prepared a technical report. The project is ongoing. b. 1) TITLE AND LOCATION (City and State) NW 102nd Avenue Roadway Improvements, Hialeah, Miami-Dade County, FL 2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 - Ongoing CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Smart-Sciences is providing environmental permitting services and contamination assessment services to the portion of NW 102nd Avenue between NW 162nd Street and NW 170th Street within the City of Hialeah proposed for roadway improvements as part of the Countyline Corporate Park development. Smart-Sciences prepared and submitted permit application packages with regulatory agencies. Ms. de Vringer conducted a wetland assessment to evaluate the acreage of the wetlands that exist within the proposed roadway footprint and a wildlife assessment to identify potential protected wildlife species using the corridor, as well as preparing the permit application packages and coordinating with the regulatory agencies. In addition, Smart-Sciences conducted a Phase I ESA identifying contamination issues of concern along the corridor. Ms. De Vringer conducted the online file review and prepared the Phase I ESA report. The primary concern found was adjacent landfill sites. Ms. De Vringer prepared a groundwater sampling plan and coordinated with Miami-Dade County Pollution Remediation Section for approval. The plan includes the installation of four groundwater monitoring wells to be sampled for ammonia, nitrates, sulfate, aluminum, iron, arsenic, and total dissolved solids. Ms. de Vringer provided oversight of installation and conducted sampling of groundwater and soils, and subsequently prepared a technical report for submittal to Miami-Dade County. c. 1) TITLE AND LOCATION (City and State) Little River Canal Bridge Replacement, Little Haiti, Miami-Dade County, FL 2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm MDC Public Works Department is proposing a complete replacement of the bridge at North Miami Avenue over Little River Canal, including roadway approaches. Smart-Sciences provided environmental services related to the project. Smart-Sciences performed an Ecological Due Diligence to assess the project construction zone for presence of wetlands and trees that would require a removal/relocation permit, submerged aquatic vegetation, as well as listed species habitat and use. Ms. de Vringer conducted the field investigation and evening pedestrian survey using acoustic recording equipment to determine if the Florida bonneted bat (FBB) is utilizing the project zone for roosting and/or foraging. Ms. de Vringer analyzed the acoustic data and prepared a technical report along with the figures in ArcGIS. No evidence of FBB usage of the project zone was found. Smart-Sciences provided a discussion regarding regulatory implications for identified environmental and wildlife constraints. d. (1) TITLE AND LOCATION (City and State) GR047 Homestead Air Reserve Base (HARB), Listed Species Assessment, Miami-Dade County, FL 2) YEAR COMPLETED PROFESSIONAL SERVICES 2018-2019 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (6/2004) Page 26 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) Smart-Sciences was contracted to provide biological support services prior to clearing of vegetation at the GR047 Site (±24.7-acres) located within the Homestead Air Reserve Base (HARB), in order to determine if flora and fauna listed as federally threatened or endangered under the U.S. Fish and Wildlife Service’s (USFWS) Endangered Species Act (ESA) of 1973, or species of concern or critical habitat are present on the Site and at risk for potential disturbance. Ms. de Vringer conducted a field assessment at the Site for listed plants species including Small’s milkpea (Galactia smallii), pineland croton (Croton linearis) and sand flax (Linum arenicola). HARB is located within the U.S. Fish and Wildlife Service consultation area for the federally endangered Florida bonneted bat (Eumops floridanus, FBB) which is known to roost within HARB. Smart-Sciences performed an FBB survey at the Site. Ms. de Vringer conducted a pedestrian survey of the project site to determine potential roost locations for additional survey using equipment such as Wildlife Acoustic song meters. Ms. de Vringer video-inspected mature trees with cavities for potential roosts presence. Acoustic song meters record bat echolocation and are used to inform as to whether bats are emerging from potential roosts, flying overhead or foraging. The song meter locations were determined through manual observations and inspections of tree crevices within the project site. Ms. de Vringer deployed song meters, evaluated recorded acoustic data for FBB presence, and prepared a listed species report. e. (1) TITLE AND LOCATION (City and State) BP Gratigny Environmental Permitting, Opa-locka, Miami-Dade County, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Smart-Sciences staff has prepared and submitted permit applications with regulatory agencies for a proposed development project located in Opa-locka, Miami-Dade County. The site is an approximate 24.95-acre site. Ms. de Vringer conducted wetland assessments to evaluate the acreage of the wetlands that exist on the property and a wildlife assessment to identify potential protected wildlife species using the site. The Uniform Mitigation Assessment Method (UMAM) and the Wetland Assessment Technique for Environmental Reviews (WATER) were utilized to evaluate the quality of the on-site wetlands and to assess the amount of mitigation required for wetland losses. Ms. de Vringer used ArcGIS to map wetlands and create figures, and prepared technical reports. She assisted in preparing the Natural Resources Report and permit applications to the regulatory agencies, and performed field visits with representatives of the regulatory agencies to verify wetland acreage and quality. The project is ongoing. Kenneth Hardin Venetian Causeway; Miami, FL 2014 2003 2015 1996 Ocean Avenue Bridge; Lantana, FL Flagler Memorial Bridge; Palm Beach, FL Sunset Island Bridge; Miami, FL Janus Research, Inc. (Tampa, FL) M.A.Cultural Resource Management B.A. Psychology and South Asian Studies Register of Professional Archaeologists Florida Archaeological Council Florida Trust for Historic Preservation Project Manager 39 39 Kathleen Hoffman Venetian Causeway; Miami, FL Ongoing 2003 2015 1996 Ocean Avenue Bridge; Lantana, FL Flagler Memorial Bridge; Palm Beach, FL Sunset Island Bridge; Miami, FL Janus Research, Inc. (Tampa, FL) Ph.D. Anthropology M.A.Anthropology B.A. Anthropology Florida Archaeological Council Register of Professional Archaeologists Principal Investigator 40 39 Amy Streelman Venetian Causeway; Miami, FL 2014 2003 2015 1996 Ocean Avenue Bridge; Lantana, FL Flagler Memorial Bridge; Palm Beach, FL Sunset Island Bridge; Miami, FL Janus Research, Inc. (Tampa, FL) M.H.P. Historic Preservation B.A. English Florida Trust for Historic Preservation National Trust for Historic Preservation Chief Architectural Historian 22 22 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Vincent McNish, P.E., LEED AP, CxA 13. ROLE IN THIS CONTRACT Senior Mechanical Engineer 14. YEARS EXPERIENCE a. TOTAL 27 b. WITH CURRENT FIRM 19 15. FIRM NAME AND LOCATION (City and State) TLC Engineering Solutions, Inc. – Miami, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) Bachelor of Science in Mechanical Engineering Master of Science in Mechanical Engineering 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Florida, Mechanical P.E. #53287 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. McNish has over twenty-six years of experience in all phases of mechanical engineering analysis and design for HVAC systems for all building types including educational, commercial and industrial facilities. Plumbing experience involves commercial and residential building configurations, systems design and code compliance studies. Fire Protection designs include wet, dry and pre-action systems experience. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) City of Sunny Isles Beach Pelican Community Center Sunny Isles, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2008 CONSTRUCTION (if applicable) 2008 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm New two-story, 13,000 square foot community center building and a basketball/gymnasium building of approximately 9,900 square feet. The community center building is to include some offices, several multi-purpose spaces, a warming kitchen and a pantry for the use of caterers. The Gymnasium is to include a full-size basketball court and a snack bar area. $7.4 million / 23,000 sf Project Role: Senior Mechanical Engineer b. (1) TITLE AND LOCATION (City and State) City of Miramar Police Headquarters, Miramar, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (if applicable) 2017 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Design criteria for a new headquarters integrated into an existing parking garage structure. The new three-story structure will provide retail space at the ground floor and police department on the second and third floors. Provided security design for OnSSI Occularis CCTV. 80,000 sf Certified LEED NC 2009 Gold. Project Role: Senior Mechanical Engineer c. (1) TITLE AND LOCATION (City and State) Royal Caribbean Cruise Lines Ltd. Innovation Lab, Miami, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (if applicable) 2017 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Building expansion at Royal Caribbean's headquarters, including open space to build full-size mock-ups of proposed designs and ignition hubs to provide flexible space for large charrettes or multiday work sessions. A three-story virtual reality "cave" provides a visual representation of new features for future cruise ships. A pedestrian bridge on the second floor connects the lab to RCL's PortMiami headquarters building, which also underwent a 30,000 square foot renovation as part of this project. Design-build and Lean principles contributed to completing the project in just 10 months. Energy modeling estimated saving energy costs by 23.5% compared to ASHRAE 90.1-2007. 2016, AIA Palm Beach, Unbuilt Award of Merit, Non-Residential. LEED 2009 Silver Certified. $20 million / 20,000 sf. Project Role: Senior Mechanical Engineer d. (1) TITLE AND LOCATION (City and State) City of Miami Springs Aquatic Facility, Miami Springs, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (if applicable) 2015 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm New single-story aquatic support facility with 3,000 sf of pool equipment and locker room, a 400 sf concession space, 1,200 sf of administrative offices and a 4,000 sf multi-purpose room along with open air cabanas, pool and site lighting. $5 million / 8,600 sf. Project Role: Senior Mechanical Engineer e. (1) TITLE AND LOCATION (City and State) City of Miami Beach Parking Lots, Miami Beach, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (if applicable) 2015 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Electrical Lighting design for three parking lots (12X, 17X and 4D) along with the necessary foot candle calculations, photometrics and circuiting. The project also includes an irrigation system design to complement the landscaping design/$200,000/2015/TLC Prime. Project Role: Senior Mechanical Engineer E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Ralph Baeza, PE, MBA, MA., LEED AP 13. ROLE IN THIS CONTRACT Senior Electrical Engineer 14. YEARS EXPERIENCE a. TOTAL 37 b. WITH CURRENT FIRM 12 15. FIRM NAME AND LOCATION (City and State) TLC Engineering Solutions, Inc. – Miami, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) B.S. Electrical Engineering/MBA/ Universidad Nacional Autónoma de Honduras/M.A., Trinity International University Business Administration Organizational Leadership 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Florida, P.E. #42641 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Baeza is a registered professional engineer with over thirty years of experience, in all aspects of electrical engineering, project management and design in the building construction industry. Mr. Baeza background with engineering systems encompasses high, medium and low voltage power, normal and emergency power, lighting, fire alarm, telephone, television, public address, security, lighting protection, environmental control and building management for residential, commercial, institutional and industrial buildings. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) City of Miramar Police Headquarters Building Miramar, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (if applicable) 2017 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Design criteria for a new headquarters integrated into an existing parking garage structure. The new three-story structure will provide retail space at the ground floor and police department on the second and third floors. Provided security design for OnSSI Occularis CCTV. 80,000 sf Certified LEED NC 2009 Gold.Project Role: Senior Electrical Engineer b. (1) TITLE AND LOCATION (City and State) City of Miami Beach Bus Stop Shelters Miami Beach, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (if applicable) 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Prototype of a site adaptable bus shelter system (or module) for 197 sites. Project Role: Senior Electrical Engineer c. (1) TITLE AND LOCATION (City and State) Royal Caribbean Cruise Lines Ltd. Innovation Lab, Miami, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (if applicable) 2017 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Building expansion at Royal Caribbean's headquarters, including open space to build full-size mock-ups of proposed designs and ignition hubs to provide flexible space for large charrettes or multiday work sessions. A three-story virtual reality "cave" provides a visual representation of new features for future cruise ships. A pedestrian bridge on the second floor connects the lab to RCL's PortMiami headquarters building, which also underwent a 30,000 square foot renovation as part of this project. Design-build and Lean principles contributed to completing the project in just 10 months. Energy modeling estimated saving energy costs by 23.5% compared to ASHRAE 90.1-2007. 2016, AIA Palm Beach, Unbuilt Award of Merit, Non-Residential. LEED 2009 Silver Certified. $20 million / 20,000 sf. $20 million / 20,000 sf. Project Role: Senior Electrical Engineer d. (1) TITLE AND LOCATION (City and State) City of Miami Springs Aquatic Facility, Miami Springs, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (if applicable) 2015 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm New single-story aquatic support facility with 3,000 sf of pool equipment and locker room, a 400 sf concession space, 1,200 sf of administrative offices and a 4,000 sf multi-purpose room along with open air cabanas, pool and site lighting. $5 million / 8,600 sf. Project Role: Senior Electrical Engineer e. (1) TITLE AND LOCATION (City and State) Florida International University Sports Practice Fields Miami, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (if applicable) 2017 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm The project is to consist of the design for approximately 6,500 sf of additions and 34,000 sf of alterations to the existing clubhouse, approximately 40,500 GSF overall, located in Boynton Beach, Fl. $4 million / 40,500 sf. Project Role: Senior Electrical Engineer E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Manuel A. Mollinedo, PE, LEED Green Associate 13. ROLE IN THIS CONTRACT Design Engineer | Electrical 14. YEARS EXPERIENCE a. TOTAL 14 b. WITH CURRENT FIRM 6 15. FIRM NAME AND LOCATION (City and State) TLC Engineering Solutions, Inc. – Miami, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) Universidad Central de Las Villas, Cuba B.S., Electrical Engineering VEB Nachricht Electronic Engineering, Germany M.S., Microwave Link Communications 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Florida, Electrical P.E. #63096 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Manuel is a registered professional engineer in Florida and Virginia with more than 10 years of experience. He has experience in all aspects of electrical engineering including high, medium and low voltage power, normal and emergency power, lighting, fire alarm, telephone, television, public address, security, lighting protection, environmental control and building management for residential, commercial, institutional and industrial buildings. He has strong experience in project management and coordination with multiple disciplines. His project experience includes educational facilities, institutional projects and office space. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Broward College Parking Lot Lighting Davie, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2014 CONSTRUCTION (if applicable) 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Development of electrical engineering design drawings for the lighting audit and assessment of 14 parking lots at Broward College. Additional services updates include parking lots J, L and M and associated entrance to campus Project Role: Electrical Design Engineer b. (1) TITLE AND LOCATION (City and State) City of Miramar Police Department Headquarters Miramar, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (if applicable) 2017 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Design criteria for a new headquarters integrated into an existing parking garage structure. The new three-story structure will provide retail space at the ground floor and police department on the second and third floors. Provided security design for OnSSI Occularis CCTV. 80,000 sf Certified LEED NC 2009 Gold. Role: Electrical Design Engineer c. (1) TITLE AND LOCATION (City and State) Royal Caribbean Cruise Lines Ltd. Innovation Lab, Miami, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION (if applicable) 2017 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Building expansion at Royal Caribbean's headquarters, including open space to build full-size mock-ups of proposed designs and ignition hubs to provide flexible space for large charrettes or multiday work sessions. A three-story virtual reality "cave" provides a visual representation of new features for future cruise ships. A pedestrian bridge on the second floor connects the lab to RCL's PortMiami headquarters building, which also underwent a 30,000 square foot renovation as part of this project. Design-build and Lean principles contributed to completing the project in just 10 months. LEED 2009 Silver Certified. $20 million / 20,000 sf. Project Role: Electrical Design Engineer d. (1) TITLE AND LOCATION (City and State) City of Miami Springs Aquatic Facility, Miami Springs, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2013 CONSTRUCTION (if applicable) 2015 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm New single-story aquatic support facility with 3,000 sf of pool equipment and locker room, a 400 sf concession space, 1,200 sf of administrative offices and a 4,000 sf multi-purpose room along with open air cabanas, pool and site lighting. $5 million / 8,600 sf. Project Role: Electrical Design Engineer e. (1) TITLE AND LOCATION (City and State) City of Miami Beach Bus Stop Shelters Miami Beach, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (if applicable) 2018 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Prototype of a site adaptable bus shelter system (or module) for 197 sites Project Role: Electrical Design Engineer F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER (1) 21. TITLE AND LOCATION (City and State) Hard Rock Stadium Pedestrian Bridges Design 22. YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) 2020 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNERCity of Miami Gardens b. POINT OF CONTACT NAMELes Pettit c. POINT OF CONTACT TELEPHONE NUMBER305-622-8000 24.BRIEF DESCRIPTION OF PROJECT AND REVELANCE TO THIS CONTRACT (Include scope, size, and cost) EAC as a Sub to Bentley has just completed the design of two pedestrian bridges to facilitate pedestrian access to and from the Hard Rock Stadium which can hold up to 60,000 spectators. One of the proposed bridges, with a span length of 151’-11” and a width of 14’-0”, will be over NW 199th Street on the south side of the stadium and the other, with a span length of 206’-11”and a width of 14’-0”, will be over the Turnpike Access Road on the east side. The superstructure for both bridges was designed by Contech Engineered Solutions LLC and will be a variable depth walk-thru steel truss with a cast-in-place concrete deck. The bridges approach ramps will have pedestrian walkways supported by wrap- around MSE walls, as well as stairs at the ramp entrances to facilitate pedestrian access during sports events. Construction on this fast track Design-Build project has already started in mid-January 2019 and is scheduled for completion by the end of September 2019 – just in time for the onset of the NFL regular season and five months before the stadium hosts Super Bowl LIV. EAC provided design services for the two pedestrian bridges substructures and for the MSE wall control drawings for the ramps at both bridge approaches. With a very aggressive schedule on this job, EAC was able to meet all of the design submittals deadlines. EAC is currently providing Post-Design services for the bridges and MSE walls related items. 25.FIRMS FROM SECTION INVOLVED WITH THIS PROJECT a. (1)FIRM NAME EAC Consulting, Inc. (2) FIRM LOCATION (City and State) Miami, FL (3) ROLE Prime b. (1)FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE c. (1)FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1)FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1)FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. (1)FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 - EAC Consulting, Inc. Page 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER (2) 21. TITLE AND LOCATION (City and State) Snake Creek Pedestrian Bridge, North Miami Beach, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES 2008 CONSTRUCTION (If applicable) 2009 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of North Miami Beach b. POINT OF CONTACT NAME Esmond Scott c. POINT OF CONTACT TELEPHONE NUMBER (305) 948-2925 24. BRIEF DESCRIPTION OF PROJECT AND REVELANCE TO THIS CONTRACT (Include scope, size, and cost) The new pedestrian bridge crossing the Snake Creek (C-9) Canal at Challenger Park in North Miami Beach replaced a timber structure that was decades old and in dire need of repair. So much so, that the timber structure was closed to traffic for a number of months before its demolition. EAC Consulting assessed the costs of repairing and continued maintenance versus replacing. The economics overwhelmingly proved that replacement would be in the City's best interest. This new structure, scheduled to open for pedestrian traffic in early July 2008, will re-establish a vital link between the communities lining the banks of the canal seeking to gain access to local houses of worship, schools and all-around general use. The new crossing has design life of 75+ years. Cost: $750,000 (Construction Cost) 25. FIRMS FROM SECTION INVOLVED WITH THIS PROJECT a. (1) FIRM NAME EAC Consulting, Inc. (2) FIRM LOCATION (City and State) Miami, FL (3) ROLE Prime b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 - EAC Consulting, Inc. Page 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER (3) 21. TITLE AND LOCATION (City and State) NW 21st Street Avenue Pedestrian Bridge Over C-13 Canal, Oakland, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES 2012 CONSTRUCTION (If applicable) 2013 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER Broward County Highway Construction and Engineering Division b. POINT OF CONTACT NAME Richard Tornese, PE c. POINT OF CONTACT TELEPHONE NUMBER 954-577-4579 24. BRIEF DESCRIPTION OF PROJECT AND REVELANCE TO THIS CONTRACT (Include scope, size, and cost) EAC provided Project Management and Civil Engineering services for the NW 21st Avenue Pedestrian Bridge. The bridge provides safe access for pedestrians across the C-13 canal and prevents members of the community from having to share the existing adjacent roadway bridge and an old pedestrian bridge, which is in a state of disrepair. The project stakeholders included the South Florida Water Management District (SFWMD), Broward County and the City of Oakland. The project features include a prefabricated aluminum bridge with concrete abutments and ADA accessibility. Safety features include lighting and a closed caption television (CCTV) system for security. Cost: $ $84,447.00 (Contract Value) 25. FIRMS FROM SECTION INVOLVED WITH THIS PROJECT a. (1) FIRM NAME EAC Consulting, Inc. (2) FIRM LOCATION (City and State) Miami, FL (3) ROLE Prime b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 - EAC Consulting, Inc. Page 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER (4) 21. TITLE AND LOCATION (City and State) Downtown Government Center Station (All Aboard Florida) 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER CGC/Brightline b. POINT OF CONTACT NAME Robert Cortes c. POINT OF CONTACT TELEPHONE NUMBER 305-520-2470 24. BRIEF DESCRIPTION OF PROJECT AND REVELANCE TO THIS CONTRACT (Include scope, size, and cost) EAC provided structural design services for the Miami Central Station Rail Infrastructure and Rail Viaduct, and also provided post-design support. The viaduct is an elevated guideway structure, built 50 feet above ground for AAF and Tri-Rail passenger trains. EAC collaborated with New York City architectural firm Skidmore, Owings, & Merrill (SOM) on the design of one of the viaduct’s most prominent features, the distinctive V-shaped columns which enhance the aesthetics and open layout of the station’s entrance. In order to maintain the station’s high- quality environment, EAC’s design also employs context-sensitive vibration impact mitigation, which would prevent train vibration from spreading into the station area. As an integrated component of the Miami Central Station, the design of the viaduct is an example of the sensitive balance of aesthetic form and function. Total Construction: $1.5 Billion 25. FIRMS FROM SECTION INVOLVED WITH THIS PROJECT a. (1) FIRM NAME EAC Consulting, Inc. (2) FIRM LOCATION (City and State) Miami, FL (3) ROLE Prime b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 - EAC Consulting, Inc. Page 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER (5) 21. TITLE AND LOCATION (City and State) MERIDIAN AVENUE OVER COLLINS CANAL (FICE 2000 Engineering Excellence Award, 2000 FTBA Best in Construction Award) Miami, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES 2001 CONSTRUCTION (If applicable) 2002 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER Florida Department of Transportation- District 6 b. POINT OF CONTACT NAME Adriana Manzanares c. POINT OF CONTACT TELEPHONE NUMBER (305) 470-5283 24. BRIEF DESCRIPTION OF PROJECT AND REVELANCE TO THIS CONTRACT (Include scope, size, and cost) EAC Consulting, Inc. provided the bridge replacement design services for the Meridian Avenue Bridge over Collins Canal. The project required coordination with the adjacent Holocaust Memorial to incorporate aesthetic treatments. The improvements included: roadway, drainage, signalization, lighting and maintenance of traffic. Specifically, the project included the following: 1.Replacement of the bridge over Collins Canal. 2. Reconstruction of the south approach Meridian Avenue roadway. The reconstruction included the removal of on street parking; thereby allowing for an increase in the width of the west sidewalk. The final roadway configuration included two northbound lanes (one as a turn lane) and one southbound lane. 3. Aesthetic/streetscape improvements included: pigmented cement pavers for the roadbed and bridge, stone pavers for the sidewalk, stone veneer for the vertical surfaces of the bridge, and decorative lighting 4. Drainage improvements included the installation of a drainage well to dispose of the contaminated water prior to discharge into the Collins Canal. 5. Signalization and non-decorative roadway lighting. 25. FIRMS FROM SECTION INVOLVED WITH THIS PROJECT a . (1)FIRM NAME EAC Consulting, Inc. (2)FIRM LOCATION (City and State) Miami, FL (3)ROLE Prime b. (1) FIRM NAME (2) FIRM LOCATION (City an d State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d . (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e . (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE SF330Project Experience - EAC Consulting, Inc. F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER (6) 21. TITLE AND LOCATION (City and State) VENETIAN CAUSEWAY IMPROVEMENTS Miami, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES 2012 CONSTRUCTION (If applicable) 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER FDOT District Six b. POINT OF CONTACT NAME Dat Huynh, PE c. POINT OF CONTACT TELEPHONE NUMBER (305) 470-5217 24. BRIEF DESCRIPTION OF PROJECT AND REVELANCE TO THIS CONTRACT (Include scope, size, and cost) EAC Consulting, Inc. is currently providing a Project Development & Environment (PD&E) study to examine the potential replacement or rehabilitation of the twelve existing bridges (ten low-level fixed spans and two movable bascules) along the Venetian Causeway from North Bayshore Drive to Purdy Avenue. The Venetian Causeway bridges were originally built in 1926 and have been designated as historic landmarks by the City of Miami and City of Miami Beach; they are also listed on the National Register of Historic Places (NRHP). The causeway bridges are mainly short span reinforced concrete arch beam bridges. Each bridge section consists of two 12' travel lanes with 4' bike lanes and 4' sidewalks on each side. Project requirements include the inspection of the bridges, engineering reports, environmental documents, a Section 4(f) document and preliminary plans. Improvements include the possible replacement or rehabilitation of the functionally obsolete structures based on the latest criteria and standards. Extensive public involvement efforts are being done as part of this study. The PD&E study will look at alternatives that satisfy the public; protect the environment; are sensitive to the historic designation; result in bridges that are safe, maintainable and serve the needs of the public. 25. FIRMS FROM SECTION INVOLVED WITH THIS PROJECT a. (1) FIRM NAME EAC Consulting, Inc. (2) FIRM LOCATION (City and State) Miami, FL (3) ROLE Prime b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER (7) 21. TITLE AND LOCATION (City and State) MetroZoo Aviary -Miami, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES N/A CONSTRUCTION (If applicable) 2003 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER Miami – Dade County parks and Recreation Department b. POINT OF CONTACT NAME Michael Yaskin c. POINT OF CONTACT TELEPHONE NUMBER (305) 755-7816 24. BRIEF DESCRIPTION OF PROJECT AND REVELANCE TO THIS CONTRACT (Include scope, size, and cost) EAC Consulting, Inc. was responsible for the utilities design and construction management services for the Miami-Dade Parks & Recreation Metroozoo - “Wings of Asia” Aviary. This project involves the extension, connection and permitting of water and sanitary sewer service for the Aviary. The project requires the determination of the existing pump station capacity at the Metrozoo and the ability to handle the new loads from the Aviary. A 12” water main extension was provided as well as a connection to an existing main. EAC’s responsibility also included the design of drainage systems for the Aviary, the paving and grading of the entrance driveways into the Aviary, and the pedestrian bridges on the project. PROJECT COST: $3.5 million PROJECT FEES: $55,000 25. FIRMS FROM SECTION INVOLVED WITH THIS PROJECT a. (1) FIRM NAME EAC Consulting, Inc. (2) FIRM LOCATION (City and State) Miami, FL (3) ROLE Prime b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE SF330Project Experience - EAC Consulting, Inc. 25. FIRMS FROM SECTION INVOLVED WITH THIS PROJECT a. (1) FIRM NAME EAC Consulting, Inc. (2) FIRM LOCATION (City and State) Miami, FL (3) ROLE Prime b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER (8) 21. TITLE AND LOCATION (City and State) Tamiami Canal Historic Swing Bridge PD&E, NW South River Drive, Miami-Dade County, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES 2004 CONSTRUCTION (If applicable) 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER FDOT District 6 b. POINT OF CONTACT NAME Jorge Gomez c. POINT OF CONTACT TELEPHONE NUMBER 305-470-5183 24. BRIEF DESCRIPTION OF PROJECT AND REVELANCE TO THIS CONTRACT (Include scope, size, and cost) The Florida Department of Transportation (FDOT) District VI has initiated this Project Development and Environment (PD&E) Study to identify transportation improvements for the Tamiami Canal Bridge on NW South River Drive/Delaware Parkway in order to meet existing and future pedestrian, vehicular, navigational and hydraulic conveyance needs. The project area is located on NW South River Drive between NW 19th Street and NW 32nd Avenue. Built in 1921, this existing movable swing bridge crosses over the Tamiami Canal (C-4) on NW South River Drive and is one of the oldest bridges on the Miami River System. The bridge’s age and unique engineering make it eligible for listing on the National Register of Historic Places. Any proposed improvement would require documentation to show that there is no prudent or feasible alternative. The bridge has deteriorated over the years and has suffered structural damage due to vehicular and vessel impacts. Structural deficiencies have resulted in weight restrictions of 30 tons, traffic and pedestrian safety concerns, and capacity concerns. The current bridge configuration has resulted in channel constriction and negative impacts to storm water management efforts. EAC is responsible for the roadway design, structures, corridor analysis, drainage, and PD&E study. To date, we have completed the data collection, the alternative corridor analysis and the roadway/bridge alternatives analysis portion of this study, along with the corresponding Public Involvement efforts including public meetings, meetings with public officials and agencies, alternatives public workshop and newsletters. F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER (9) 21. TITLE AND LOCATION (City and State) Professional Services Agreement for Civil Engineering Services 22. YEAR COMPLETED PROFESSIONAL SERVICES 2016-Present CONSTRUCTION (If applicable) 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER Village of Key Biscayne b. POINT OF CONTACT NAME Ana Varona c. POINT OF CONTACT TELEPHONE NUMBER 305.365.7568 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The Village of Key Biscayne (VKB) encompasses 850 acres and is characterized by terrain topography that is predominantly flat and low lying in relation to sea level. The elevations of the roadways are approximately 3.5 feet to nearly 6 feet above mean sea level (MSL). Due to its close proximity to Biscayne Bay and the Atlantic Ocean, the Village's stormwater management system is completely influenced by tidal waters, which presents a challenge for stormwater disposal systems. The fluctuating sea levels directly affect the boundary conditions of the stormwater drainage systems within the Village. EAC Consulting implemented a project approach methodology that proposed measures and systems that serve to protect the Village. The measures protect residents and businesses from property damage and quality of life disruptions that are associated with excessive flooding and prolonged staging of water. Projects: • Task 2 - Stormwater Improvement Implementation Plan • Emergency Pump Station Maintenance Evaluation for Ocean Lane Pump Station and East Heather Drive Pump Station • K-8 Sanitary Sewer System Relocation and Extension Design • 401 Hampton Lane - Phase 1 Assessment • Beach Physical Monitoring Services • FDEP Local Government Funding Request Support Services • Year 7 NNS Biological Monitoring • Year 1 Post Construction Biological Monitoring • Phase V Village-wide Lighting Improvements • Beach Renourishiment • Toddler Park Lighting • Mashta Bridge Repair • Fernwood Lighting • Beach Renourishment Post Design Services • Kite Surfing Channel • Beach Renourishment - Biological Monitoring • Park Pavillions • Beach Management Feasibility and Technical Support Services • Basketball Courts Cover • No name Shoal Biological Monitoring • Buoy Design for Kite Surfing Channel 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME EAC Consulting, Inc. (2) FIRM LOCATION (City and State) Miami, FL (3) ROLE Prime b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 (REV. 8/2016) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER (10) 21. TITLE AND LOCATION (City and State) Civil Engineering Services, Town of Medley, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES 2011-2019 CONSTRUCTION (If applicable) 2013-2019 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER Town of Medley b. POINT OF CONTACT NAME Jorge Corzo, PE c. POINT OF CONTACT TELEPHONE NUMBER 305.887.9541 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Since 2011, EAC Consulting, Inc has performed miscellaneous professional Civil Engineering Design Services to the Town of Medley. As part of these improvements our scope of services have included milling and resurfacing of the existing street, curb and gutter replacements, drainage and utility adjustments to improve service, brick pavers enhancements, concrete crosswalks, landscaping, streetscape enhancements, traffic signalization, bridge design, and pavement signings and markings. All our plans were designed and developed in full conformance with the Town of Medley Criteria, Miami- Dade County Public Works Department Standards and the Miami- Dade Department of Regulatory and Economic Resources (RER) criteria. Projects: 1. NW South River Drive Streetscape Masterplan 2. NW 96 Street Drainage and Streetscape Improvements 3. NW South River Drive Roadway and Drainage Improvements 4. NW South River Drive Watermain Improvements 5. NW 105 Way Bridge Improvements CEI Services 6. Danny Meehan Recreational Fields DCP 7. NW 116th Way Bridge Improvements 8. NW South River Drive Traffic Analyses and Planning 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME EAC Consulting, Inc. (2) FIRM LOCATION (City and State) Miami, FL (3) ROLE Prime Consultant b. (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 (REV. 8/2016) PAGE 3 P- 64 G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 26. NAMES OF KEY PERSONNEL (From Section E, Block 12) 27. ROLE IN THIS CONTRACT (From Section E, Block 13) 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in "Example Projects Key" section below before completing table. Place "X" under project key number for participation in same or similar role.) 1 2 3 4 5 6 7 8 9 10 Harold Desdunes, PE PRINCIPAL-IN-CHARGE K.T. Lin, PE, PhD PROJECT MANAGER X X X X X X X X Stephanie Romero, PE DEPUTY PROJECT MANAGER X X X X Enrique “Rick” Crooks, PE QUALITY CONTROL-BRDIGES X X X X X X X X Michael Adeife, PE QUALITY CONTROL-CIVIL/ROADW X X X Chun Li, PE QUALITY CONTROL-BRDIGES X X X Abid Hadrous, PE BRIDGES/STRUCTURES X X X X X Ning Wang, PE BRIDGES/STRUCTURES X X Mohammad Fesharaki, PE BRIDGES/STRUCTURES X X David Gilpin-Hudson, AICP PLANNING X Huntley Higgins, PE, PMP CIVIL ENGINEERING DESIGN X X Evelyn Rodriguez, PE, ENV SP CIVIL ENGINEERING DESIGN X X Miguel Lockward, PE, ENV SP CIVIL ENGINEERING DESIGN X X Satiar Shirazi, PE ROADWAY/MOT X Rodney Devera, PE ROADWAY/MOT X X Darren Dyer, PE DRAINAGE X Ramon Borges, PE LIGHTING Girish Thallapragada, PE LIGHTING Richard Lopez LIGHTING Sergio Besu CONSTRUCTION ENGINEERING INSPECTIONS (CEI) Jeff LaBelle CONSTRUCTION ENGINEERING INSPECTIONS (CEI) STANDARD FORM 330 (REV. 3/2013) PAGE 4 29. EXAMPLE PROJECT KEY NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) 1 Hard Rock Stadium 6 Venetian Causeway Improvements 2 Snake Creek Pedestrian Bridge 7 Metro Zoo Aviary 3 NW 21st Street Avenue Pedestrian Bridge Over C-13 Canal 8 Tamiami Canal Historic Swing Bridge PD&E, NW South River Drive 4 Downtown Government Center Station (All Aboard Florida) 9 Professional Services Agreement for Civil Engineering Services 5 Meridian Avenue Over Collins Canal 10 Civil Engineering Services, Town of Medley H. ADDITIONAL INFORMATION PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED: I. AUTHORIZED REPRESENTATIVE (the foregoing is a statement of facts) 31. SIGNATURE OF AUTHORIZED REPRESENTATIVE: 32. DATE SIGNED: 1/7/2020 33. NAME AND TITLE OF SIGNER: K.T. Lin, PhD., PE STANDARD FORM 330 (REV. 3/2013) PAGE F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 1 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED Aventura Optima Aventura, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2011-2013 2013 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Optima International Ariel Broomberg 305 677 9864 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (include scope, size, and cost) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE Savino & Miller Design Studio, PA 12345 NE 6th Avenue, North Miami, FL 33161 Landscape Architect b.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE c.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE d.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE A LEED Platinum project, was designed to integrate architecture and nature, providing native landscaped areas on three different levels as well as facade greening. The fifth level terrace consists of a large fountain with ‘floating’ wood deck providing a gathering space or seating area for passersby and employees alike. The roof garden provides a tranquil space for users to relax amongst the rolling landscape forms or exercise using the surrounding track. All materials utilized for this project come from recycled or reclaimed sources and the majority are produced by local manufacturers. Client: Optima International LLC Service: Master Planning, Schematic Design, Design Development, Construction Documents and Construction Administration for planting, paving, irrigation, fountains and green roof Architect: Behar Font & Partners Awards: 2015 FL ASLA Award of Merit, 2015 Green Roofs for HealthyCities Award of Excellence, 2014 Most Outstanding LEED CS Project by the South Florida Chapter of the U.S. Green Building Council F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 2 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED Museum Park Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2010-2013 2014-2019 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT EMAIL ADDRESS City of Miami John De Pazos jdepazos@miamigov.com 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (include scope, size, and cost) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE Savino & Miller Design Studio, PA 12345 NE 6th Avenue, North Miami, FL 33161 Landscape Architect b.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE c.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE Museum Park is located on the site of the former “Bicentennial Park” that essentially isolated a portion of the Downtown Miami urban fabric from its waterfront. Approximately twenty acres in size, the park sits at the terminus of Government Cut, the City’s waterway axis from the Atlantic Ocean. This open space is one of the rare opportunities to public access the waterfront in Miami. The park, conceived together with the proposed Perez Art Miami Museum (completed) and the Phillip and Patricia Frost Science Museum (in construction), has become popular for residents and tourists alike, serving the booming urban district adjacent to the park space, and museum visitors. Museum Park Phase I is part of the original Master Plan concept, at a price of $45 million. In 2010, the recession forced the City to temporarily abandon the project. In 2011-12, as the recession came to a close, the City decided to begin a scaled- down version of the original park as a first step towards eventually realizing the original Park’s design intent. Savino & Miller was hired to implement this phase for $10 Million (Baywalk, Entrance, Open Green, Museum Plaza). Cost: $10 Million Size: 19 Acres Services: Landscape Architecture: Master Plan, Paving/Site furniture consultation, Planting & Irrigation Improvements, and Construction Phase Services. Award: 2015 FL ASLA Award of Merit F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 3 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED South Pointe Park Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2005-2009 2010 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT EMAIL ADDRESS City of Miami Beach John Oldenburg, Former Assistant Director, City of Miami Beach joldenburg@balharbourfl.gov 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (include scope, size, and cost) South Pointe Park is designed as a dramatic, ecologically sensitive park at the south end of Miami Beach. The design is programmed to accommodate both active and passive recreation, with play fields, dune and hammock zones, a playground, and a 20 ft. wide baywalk. An important goal in the Master Plan process was to integrate the park into the urban fabric of the city by strengthening and improving the two major street axes which penetrate the park space. SMDS provided consultation for Master Site Planning, paving materials and site furniture selection, and was the primary landscape architect for the park’s planting and irrigation improvements. The fast-track design process began with Master Planning in April 2005. Project was completed in May 2010. Services: Local Landscape Architect: Master Plan, Planting & Irrigation Improvements, and Construction Phase Services Prime: Hargreaves Associates Size: Approx. 22 Acres Project Cost: $20,000,000 Award: 2010 FNGA Award of Excellence 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE Savino & Miller Design Studio, PA 12345 NE 6th Avenue, North Miami, FL 33161 Local Landscape Architect b.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE c.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 4 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED Belle Isle Streetscape & Park Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2007-2010 2008-2010 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT EMAIL ADDRESS City of Miami Beach Carla Dixon, Project Manager carladixon@miamibeachfl.gov 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (include scope, size, and cost) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE Savino & Miller Design Studio, PA 12345 NE 6th Avenue, North Miami, FL 33161 Landscape Architect b.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE c.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE Belle Isle Park, located on the only natural island of the Venetian Islands between Miami and Miami Beach, is a major open space surrounded on three sides by high-density condominium buildings, and Venetian Causeway to the north. The space offered no walkways or large open spaces for play, but was mostly used by residents to walk the dogs. SMDS was asked to create a plan to attract more residents to use the park, and responded with a plan which provided for a range of recreational opportunities. A large elliptical open space formed by a walkway, coupled with a “Bark Park” and numerous small paved seating areas – located by each of the park entry/street crosswalks – allows for both passive and active play activities. Numerous existing trees and palms were preserved or transplanted to create and define the park’s spaces. In addition to the park, SMDS was hired for the Venetian Islands GOB project: a mid-Miami Beach neighborhood general obligation bond project for streetscape, water main and drainage improvements, which included Belle Isle’s streetscape. SMDS’ role was to master plan and prepare street designs for the revised street layout/reconfiguration and signage. The master plan’s major thrust was to call for narrowing streets to facilitate three goals: 1) traffic calming; 2) improve drainage; and 3) increase green space. A number of meetings resulted in creating consensus to target various improvements, i.e. planting, lighting, and sidewalk installation/repair. Size: 6 Acre Park + Streetscape Principal Firm: Jacobs & Associates Scope: Schematic through Construction Phase Services Project Cost: $450,000 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 5 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED Sunny Isles Gateway Park Sunny Isles, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2012-2013 2017 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT EMAIL ADDRESS City of Sunny Isles Joseph Milton josephmilton@j-milton.com 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (include scope, size, and cost) Sunny Isles Beach Park/Garage is a park designed as a new community green space, ideally located at one of the major gateways to the City. Established as a joint venture between developer (who has significant condominium holdings adjacent to the park) and the City, the park provides diverse recreational activities and allows for programming large community events like concerts, games, etc. A small courtyard is located adjacent to a planned cafe, along with a waterfall, water play area and playground. Location: Sunny Isles Beach, FL Service: Master Plan thru Construction Administration Principal Firm: Axioma3 Architects Date:Ongoing Project Cost: $2 Million Principal in-charge: Barry Miller 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE Savino & Miller Design Studio, PA 12345 NE 6th Avenue, North Miami, FL 33161 Local Landscape Architect b.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE c.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE SITE PLAN FINAL CONCEPT 01-19-2012 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 6 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED Sunny Isles City Hall Sunny Isles, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2002-2004 2004 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT EMAIL ADDRESS City of Sunny Isles Lawrence Kline (Perkins & Will)lawrence.kline@perkinswill.com 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (include scope, size, and cost) In close collaboration with the City and design team, a Master Plan was created to link street, building, and open space. Our open space concept integrates City Hall and adjacent restaurant into a cohesive urban setting. Users are engaged through sensitive placement of indoor- outdoor elements/activities. SMDS was responsible for all open space improvements, including Fountain/Plaza, site lighting, planting and paving. Native/xeriscape planting and local paving materials were selected for their sustainability and ease of maintenance. Location: Sunny Isles Beach, Florida Client: Spillis Candela / City of Sunny Isles Beach Project Cost: $300,000 Service: Master Planning, Schematic Design – Construction Administration Architect: Spillis Candela & Partners (Currently Aecom) Date Construction: 2004 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE Savino & Miller Design Studio, PA 12345 NE 6th Avenue, North Miami, FL 33161 Landscape Architect b.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE c.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 7 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED 41st Street Bridge Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2003-2005 2005 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT EMAIL ADDRESS City of Miami Beach Ira Giller (Owner’s Rep)ira@gillerandgiller.com 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (include scope, size, and cost) The design concept is based on the importance of 41st Street as a diverse community center and major gateway into the heart of Miami Beach. The goal was to transform the street into a tropical cosmopolitan “boulevard,” based on 41st Street’s unique geographic location and particular functions. The design called for a sequence of spatial experiences, or “events,” which were linked together by Royal Palms, flowering shrubs, and groundcovers. A landscape median was proposed for the length of the street, with new decorative paving for all sidewalks. A major element of the plan was the redesign of the Indian Creek Bridge, calling for wider sidewalks, benches, planters, and a pavilion lighthouse, acting as a gateway to the street. Location: Miami Beach, FL Service: Master Plan, Schematic Plans, Design Development, Construction Administration Principal Firm: Consul-Tech Engineering Date:2005 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE Savino & Miller Design Studio, PA 12345 NE 6th Avenue, North Miami, FL 33161 Landscape Architect b.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE c.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 8 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED River Landing Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2012-present In Progress 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT EMAIL ADDRESS River Landing, LLC Andrew Hellinger andy@urbanxco.com 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (include scope, size, and cost) Lying on the north bank of the Miami River, the River Landing project is a large mixed-use project with big box retail, neighborhood ground level stores, and condominiums in two high-rise towers. The landscape design concept is to create a linear riverside park, which meanders along the river through a landscape of native trees and palms, raised seating and café terraces, all oriented to focus on the river itself. Still a working river, the landscape materials will reflect the maritime/industrial vocabulary of the bridges, ships and shipyards along its banks. A large amphitheater is designed on the east side of the project as a neighborhood park and performance venue. Client: River Landing LLC Service: Master Plan, Schematics - Construction Docs / Construction Administration. Project Cost: $3.5 Million Architect: ADD Inc. Architects Date: In progress 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE Savino & Miller Design Studio, PA 12345 NE 6th Avenue, North Miami, FL 33161 Landscape Architect b.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE c.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 9 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED Miami Baywalk & Riverwalk Design Guidelines Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2017-2019 N/A 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT EMAIL ADDRESS Miami Downtown Development Authority Patrice Gillespie-Smith pgsmith@miamidda.com 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (include scope, size, and cost) The Miami Baywalk Design Guidelines propose lighting, paving, planting, furnishing and shoreline improvements along Biscayne Bay and the Miami River within the Miami DDA boundaries. Focusing on Miami’s resiliency, history, culture, identity and ecology, the guidelines dictate design standards to improve existing conditions on the Baywalk and Riverwalk, providing flexibility and cohesion while staying true to the character of the site and the needs and desires of the community. Location: Miami, Florida Client: Miami Downtown Development Authority Service: Master Plan, Design Guidelines Principal Firm: Savino & Miller Design Studio Date: In Progress 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE Savino & Miller Design Studio, PA 12345 NE 6th Avenue, North Miami, FL 33161 Landscape Architect b.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE c.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 10 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED Tamiami Canal Tender House Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2010-2013 2018-2019 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT EMAIL ADDRESS Miami-Dade County Dennis Fernandez Dennis.Fernandez@miamidade.gov 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (include scope, size, and cost) The Tamiami Canal Tender House design proposes an iconic building and new bridge aesthetic that marks a gateway to the Tamiami Canal from the Miami River and a landmark for the neighborhood. This new element helps the urban articulation of the North and South sides of the Tamiami Canal. Based on the analysis of the existing conditions and engineering study, the recommendation to replace the bridge and control house necessitated a careful analysis and study of various alternatives to locate the control house according to two primary criteria: maximizing views from the control house of boat traffic, and maintaining views over vehicular and pedestrian traffic. As a result, the control house was proposed at the north-east side of the proposed new bridge. The control room provides a 180 degree view and includes two additional windows towards the rear for pedestrian traffic control on the sidewalks. The control room cantilevers over the bank at the Tamiami Canal to maximize the visual access to all boat and vehicular traffic. The location of the bridge and its relationship with the surrounding residential and warehouse neighborhoods along the Tamiami Canal, as well as the Canal itself, defines the urban context and vocabulary which inspired the aesthetic design response for the new bridge, control house and streetscape. Boats, ship smokestacks, cranes, containers, metal grates and trusses, create the visual context and identity of this area, connecting the residential community to the working warehouse neighborhood and Tamiami Canal. Portholes windows and eyebrows are also integral to the structure; to reflect the visual vocabulary of the surrounding boats. The control house, sheathed with metal skin, is designed to look as a contain- er “hanging” from a crane. The new bridge pedestrian railing recalls the existing truss system of the historic bridge, designed in a contemporary fashion with steel cables and rods. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE Savino & Miller Design Studio, PA 12345 NE 6th Avenue, North Miami, FL 33161 Landscape Architect b.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE c.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 26. NAMES OF KEY PERSONNEL (From Section E, Block 12) 27. ROLE IN THIS CONTRACT (From Section E, Block 13) 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in “Example Projects Key” section below before completing table. Place “X” under project key number for participation in same or similar role.) 1 2 3 4 5 6 7 8 9 10 Barry Miller Principal-in-Charge X X X X X X X X X Adriana Savino Master Planning X X X X X X X X X 29. EXAMPLE PROJECTS KEY NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) 1 Aventura Optima 6 Sunny Isles City Hall 2 Museum Park 7 41st Street Bridge 3 South Pointe Park 8 River Landing 4 Belle Isle Streetscape & Park 9 Miami Baywalk & Riverwalk Design Guidelines 5 Sunny Isles Gateway Park 10 Tamiami Canal Tender House H. ADDITIONAL INFORMATION 30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED. I. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts 31. SIGNATURE 32. DATE 12/13/2019 33. NAME AND TITLE Adriana Savino-Miller, President STANDARD FORM 330 (REV. 8/2016) PAGE 3 F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 1 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED CHRISTI N A AND JOHN MARKEY MEMORIAL PEDESTRIAN BRIDGE - PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Revere, MA a. PROJECT OWNER MBT A/ City of Revere 23.PROJECTOWNER'S INFORMATION b. POINT OF CONTACT NAME Margar et Lackner / Mayor Brian Arrigo c. POINT OF CONTACT TELEPHONE NUMBER (339)225 -5964 / (781) 286-81111 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCETO THIS CONTRACT (Include scope, size, and cost) The Christina and John Markey Memorial Pedestrian bridge was built as part of the Revere Transit Facility and Streetscape Project. The main span of the bridge is 107'; overall length is 151' and 52' in height. The walking surface is concrete with a 12' clear width between railings. Cost:$ 1.8 M Completed: 2012 Specific Role: Bridge Designer/ Architect Professional Services: Conceptual and Preliminary Design Relevance: This bridge project includes enhanced pedestrian and bicycle facilities as part of an aesthetic/attractive bridge structure that complements the context and enhances the views of the area. It also incorporates landscape elements to further enhance the bridge crossing. 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1)FIRM NAME Rosales + Partners, Inc. (2) FIRM LOCATION (City and State) Boston, MA (3)ROLE Bridge Designer/ Architect b. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3)ROLE c. (1)FIRM NAME (2)FIRM LOCATION (City and State)(3)ROLE d. (1)FIRMNAME (2) FIRM LOCATION (City and State)(3)ROLE e. ( 1) FIRM NAME (2) FIRM LOCATION (City and State)(3)ROLE f. (1)FIRM NAME (2) FIRM LOCATION (City and State)(3)ROLE STANDARD FORM 330 (REV. 8/2016) PAGE 3 F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20.EXAMPLE PROJECT KEY NUMBER 2 21. TITLE AND LOCATION (City and State) FRANCES APPLETON PEDESTRIAN BRIDGE - Boston, MA 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) a. PROJECT OWNER MassDOT 23. PROJECT OWNER'S INFORMATION b.POINTOF CONTACT NAME Jonathan L. Gulliver c. POINT OF CONTACT TELEPHONE NUMBER (617)973 - 7826 24. BRIEF DESCRIPTION OF PROJECT ANDRELEVANCE TO THIS CONTRACT (Include scope. size, and cost) The Frances Appleton Pedestrian Bridge is proposed plan was to restore access across the Charles River between Boston and Cambridge. It is 14' wide and the span is in the order of 230' spanning over the Storrow Drive connecting to the Esplanade. Cost: $ 12.5 M Completed: 2019 Specific Role: Bridge Designer/ Architect Professional Services: Conceptual, Preliminary Design and visualizations Relevance : This bridge project includes enhanced pedestrian and bicycle facilities as part of an aesthetic/attractive bridge structure that complements the context and enhances the views of the area. It also incorporates landscape elements to further enhance the bridge crossing. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1)FIRM NAME Rosales + Partners, Inc. (2)FIRM LOCATION (City and State) Boston, MA (3)ROLE Bridge Designer/ Architect b. (1)FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE c. (1)FIRM NAME (2)FIRM LOCATION (City and Slate)(3)ROLE d (1) FIRM NAME . (2)FIRM LOCATION (City and State)(3)ROLE e. (1)FIRM NAME (2)FIRM LOCATION (City and State)(3)ROLE f. (1)FIRM NAME (2)FIRM LOCATION (City and State)(3)ROLE STANDARD FORM 330 (REV. 8/2016) PAGE 3 F.EXAMPLEPROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 3 21.TITLE AND LOCATION (City and State)22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 1-235 PEDESTRIAN BRIDGE - Des Moines, IA 23. PROJECT OWNER'S INFORMATION a.PROJECT OWNER Iowa DOT b. POINT OF CONTACT NAME Paul Trombino Ill c. POINT OF CONTACT TELEPHONE NUMBER (515)239-1111 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Inclu de scope. size, and cost) As part of the reconstruction of 14 miles of 1-235 through downtown Des Moines, a series of three pedestrian bridges consisting of blue basket-handle steel arches with clear spans of approximately 230' cross over the interstate. Cost: $3 M per bridge (total: $9M) Completed: 2003 Specific Role: Bridge Designer/ Architect Professional Services: Concept development, Preliminary Aesthetic Design and Community Participation Relevance: This bridge project includes enhanced pedestrian and bicycle facilities as part of an aesthetic/attractive bridge structure that complements the context and enhances the views of the area. It also incorporates landscape elements to further enhance the bridge crossing. 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1)FIRM NAME Rosales + Partners, Inc. (2)FIRM LOCATION (City and State) Boston, MA (3)ROLE Bridge Designer / Architect b. (1) FIRM NAME (2)FIRM LOCATION (City and State)(3)ROLE c. (1) FIRM NAME (2)FIRM LOCATION (City and State)(3)ROLE d. (1)FIRM NAME (2) FIRM LOCATION (City and State)(3)ROLE e. (1)FIRMNAME (2)FIRM LOCATION (City and State)(3)ROLE f. (1)FIRMNAME (2) FIRM LOCATION (City and State)(3)ROLE STANDARD FORM 330 (REV. 8/2016) PAGE 3 F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONSFOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 21. TITLE AND LOCATION (City and State) CLEARWATER MEMORIAL CAUSEWAY BRIDGE - Clearwater, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) a.PROJECT OWNER Florida DOT 23.PROJECT OWNER'S INFORMATION b. POINT OF CONTACT NAME Bill Horne c. POINT OF CONTACT TELEPHONE NUMBER (727 ) 562-4040 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size. and cost) The bridge is approximately 2,400' long over Clearwater Bay with a main span of 360' and an overall width of 112'. The bridge consists of concrete tapered box girders and tapered architecturally enhanced piers carrying two traffic lanes of traffic in each direction and sidewalk on each side. Cost: $ 48.5M Completed: 2005 Specific Role: Bridge Designer/ Architect Professional Services: Conceptual and Preliminary Design Relevance: This bridge project includes enhanced pedestrian and bicycle facilities as part of an aesthetic/attractive bridge structure that complements the context and enhances the views of the area. It also incorporates landscape elements to further enhance the bridge crossing. 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1)FIRM NAME Rosales + Partners, Inc. (2)FIRM LOCATION (City and State) Boston, MA (3) ROLE Bridge Designer / Architect b. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3)ROLE c. (1) FIRM NAME (2) FIRM LOCATION {City and State)(3) ROLE d. (1) FIRMNAME (2)FIRM LOCATION (City and State)(3) ROLE e . (1)FIRM NAME (2)FIRM LOCATION (City and State)(3) ROLE f. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE 4 STANDARD FORM 330 (REV. 8/2016) PAGE 3 F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20.EXAMPLE PROJECT KEY NUMBER 5 21. TITLE AND LOCATION (City and State) MOODY PEDESTRIAN BRDIGE - Austin, TX 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applica ble) 23.PROJE CT OWNER'S INFORMATION a. PROJECT OWNER b.POINTOF CONTACT NAME The University of Texas at Austin Jay M. Bernhardt 24. BRIEF DESCRIPTION OF PROJECT ANDRELEVANCE TO THIS CONTRACT (lnclvds scope, size, and cost) c.POINT OF CONTACT TELEPHONE NUMBER (512)579 - 5010 Moody Pedestrian Bridge connects two buildings as part of the Moody College of Communication at University of Texas. The overall length of the bridge is approximately 300' with a slender tower of 65' making it the first of its kind in the U.S, with a single support tower as the main loading member. Cost: $3M Completed: 2016 Specific Role: Bridge Designer/Architect Professional Services: Conceptual Design, Final Design, Aesthetic Lighting and Construction Supervision Relevance: This bridge project includes enhanced pedestrian and bicycle facilities as part of an aesthetic/attractive bridge structure that complements the context and enhances the views of the area. It also incorporates landscape elements to further enhance the bridge crossing. 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1)FIRM NAME Rosales + Partners, Inc. (2)FIRM LOCATION (City and Stats) Boston, MA (3)ROLE Bridge Designer/ Architect b. (1)FIRM NAME (2)FIRM LOCATION (Cityand Slate) (3) ROL E C. (1)FIRM NAME (2)FIRM LOCATION (Cityand Stele)(3)ROLE d (1)FIRM NAME . (2) FIRM LOCATION (City end State)(3)ROLE e. (1) FIRM NAME (2)FIRM LOCATION (Cityand Slate)(3)ROLE f. (1)FIRM NAME (2)FIRM LOCATION (City and State)(3)ROLE a. SIGNATURE b. DATE PART II - GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (or Branch Office) NAME EAC Consulting, Inc. 3. YEAR ESTABLISHED 4. UNIQUE ENTITY IDENTIFIER 2b. STREET 5959 Blue Lagoon Drive, Suite 410 5. OWNERSHIP a. TYPE 2c. CITY Miami 2d. STATE FL 2e. ZIP CODE 33126 b. SMALL BUSINESS STATUS 6a. POINT OF CONTACT NAME AND TITLE K.T. Lin, Ph.D., PE., Senior Vice President 7. NAME OF FIRM (If Block 2a is a Branch Office) 9292 6c. E-MAIL ADDRESS 8a. FORMER FIRM NAME(S) (If any) 8b. YEAR ESTABLISHED 8c. UNIQUE ENTITY IDENTIFIER 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a.Function Code b.Discipline c.Number of Employees a.Profile Code b.Experience c. Revenue IndexNumber(see below)(1) FIRM (2) BRANCH 02 Administrative 39 2 A06 Airports, Terminals 1 08 CADD Operators 3 0 B02 Bridges 6 12 Civil Engineers 15 1 C15 Construction Management 7 15 Construction Inspectors 18 0 D04 Design-Build 3 57 Structural Engineers 8 0 H07 Highway 6 60 Transportation Engineers 10 4 I06 Intelligent Transportation Systems 5 21 Electrical Engineer 0 0 P06 Planning, Site 5 16 Construction Manager 0 0 W02 Water Resources 2 53 Scheduler 1 0 W03 Water Supply, Treatment and Distrib 6 47 Planner Urban/Regional 0 0 Other Employees Total 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) PROFESSIONAL SERVICES REVENUE INDEX NUMBER 1. Less than $100,000 6.$2 million to less than $5 million 2.$100,000 to less than $250,000 7.$5 million to less than $10 million 3.$250,000 to less than $500,000 8.$10 million to less than $25 million 4.$500,000 to less than $1 million 9.$25 million to less than $50 million 5.$1 million to less than $2 million 10. $50 million or greater a. Federal Work 4 b. Non-Federal Work 8 c. Total Work 8 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. c. NAME AND TITLE STANDARD FORM 330 (REV. 8/2016) PAGE 6 1. SOLICITATION NUMBER (If any)ARCHITECT-ENGINEER QUALIFICATIONS 19-11-01 1994 Corporation No 305-265-5400 klin@eacconsult.com 01/12/2019 K.T. Lin, Ph.D., PE., Senior Vice President PART II - GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) a. SIGNATURE ARCHITECT-ENGINEER QUALIFICATIONS 2a. FIRM (or Branch Office) NAME 2b. STREET 2c. CITY 2d. STATE 2e. ZIP CODE 3. YEAR ESTABLISHED 4. UNIQUE ENTITY IDENTIFIER 5. OWNERSHIP b. Discipline c. Number of Employees 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS b. Experience c. Revenue Index Number (see below) STANDARD FORM 330 (REV. 8/2016) PAGE 6 1. SOLICITATION NUMBER (If any) 8a. FORMER FIRM NAME(S) (If any)8b. YEAR ESTABLISHED 9. EMPLOYEES BY DISCIPLINE Total (1) FIRM (2) BRANCH 1.Less than $100,000 2.$100,000 to less than $250,000 3.$250,000 to less than $500,000 4.$500,000 to less than $1 million 5.$1 million to less than $2 million 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) 7. NAME OF FIRM (If Block 2a is a Branch Office) 6a. POINT OF CONTACT NAME AND TITLE 6c. E-MAIL ADDRESS 8c. UNIQUE ENTITY IDENTIFIER a. Federal Work b. Non-Federal Work c. Total Work 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. b. DATE c. NAME AND TITLE a. Function Code a. Profile Code 6b. TELEPHONE NUMBER a. TYPE b. SMALL BUSINESS STATUS PROFESSIONAL SERVICES REVENUE INDEX NUMBER 6.$2 million to less than $5 million 7.$5 million to less than $10 million 8.$10 million to less than $25 million 9.$25 million to less than $50 million 10.$50 million or greater Other Employees 2019-2927 S Corp SBE Savino & Miller Design Studio 12345 NE 6th Ave, Suite A North Miami Adriana Savino, President 06-47 L03 P06 002 L06 P13 R04 S11 Architect/Urban Designer Landscape Architecture Planning Urban Renewals Lighting Public Facilities Recreational Facilities Sustainable Design Landscape Architect Landscape Arch Designers Clerical 39-47 39 02 Adriana@savinomiller.com FL 33161 1 2 3 1 3058959082 1993 65-0412661 Adriana Savino, President 12-13-19 3 1 1 1 2 3 3 0 4 4 7 PART II - GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) a. SIGNATURE ARCHITECT-ENGINEER QUALIFICATIONS 2a. FIRM (or Branch Office) NAME 2b. STREET 2c. CITY 2d. STATE 2e. ZIP CODE 3. YEAR ESTABLISHED 4. UNIQUE ENTITY IDENTIFIER 5. OWNERSHIP b. Discipline c. Number of Employees 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS b. Experience c. Revenue Index Number (see below) STANDARD FORM 330 (REV. 8/2016) PAGE 6 1. SOLICITATION NUMBER (If any) 8a. FORMER FIRM NAME(S) (If any)8b. YEAR ESTABLISHED 9. EMPLOYEES BY DISCIPLINE Total (1) FIRM (2) BRANCH 1. Less than $100,000 2. $100,000 to less than $250,000 3. $250,000 to less than $500,000 4. $500,000 to less than $1 million 5. $1 million to less than $2 million 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) 7. NAME OF FIRM (If Block 2a is a Branch Office) 6a. POINT OF CONTACT NAME AND TITLE 6c. E-MAIL ADDRESS 8c. UNIQUE ENTITY IDENTIFIER a. Federal Work b. Non-Federal Work c. Total Work 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. b. DATE c. NAME AND TITLE a. Function Code a. Profile Code 6b. TELEPHONE NUMBER a. TYPE b. SMALL BUSINESS STATUS PROFESSIONAL SERVICES REVENUE INDEX NUMBER 6. $2 million to less than $5 million 7. $5 million to less than $10 million 8. $10 million to less than $25 million 9. $25 million to less than $50 million 10. $50 million or greater Other Employees 19-11-01 Corporation ACTIVE 541330 N/A LARS Engineering, Inc. 7225 NW 25 ST, Suite 211 Miami Adrian Leon / President N/A 12 B02Civil Engineering Bridges aleon@larseng.com FL 33122 3 305-631-2594 1 N/A DUNS 116716699 N/A Adrian Leon / President 12/16/2019 2 1 2 2 ARCHITECT-ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (If any) PART II – GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (or branch office) NAME 3. YEAR ESTABLISHED 4. DUNS NUMBER GEOSOL, INC. 2000 2b. STREET 5. OWNERSHIP 5795-A NW 151ST Street a. TYPE 2c. CITY 2d. STATE 2e. ZIP CODE Corporation Miami Lakes FL 33014 b. SMALL BUSINESS STATUS 6a. POINT OF CONTACT NAME AND TITLE FDOT Certified DBE Oracio Riccobono, P.E. 7. NAME OF FIRM (if block 2a is a branch office) 6b. TELEPHONE NUMBER 6c. E-MAIL ADDRESS N/A (305) 828-4367 Geosolusa@bellsouth.net 8a. FORMER FIRM NAME(S) (if any) 8b. YR. ESTABLISHED 8c. DUNS NUMBER N/A N/A 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM’S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function Code b. Discipline c. No. of employees a. Profile Code b. Experience c. Revenue Index Number (see below) (1) FIRM (2) BRANCH Administrative 1 27 Geotechnical Services in 2017 6 Civil Engineers 3 27 Geotechnical Services in 2016 6 Soils Engineers 2 27 Geotechnical Services in 2005 6 Engineering Technicians 5 27 Geotechnical Services in 2014 6 Draftmen 1 27 Geotechnical Services in 2013 6 27 Geotechnical Services in 2012 6 27 Geotechnical Services in 2011 6 Geotechnical Services in 2010 6 Geotechnical Services in 2009 6 Geotechnical Services in 2008 5 Geotechnical Services in 2007 5 Geotechnical Services in 2006 5 Geotechnical Services in 2005 5 Geotechnical Services in 2004 5 Geotechnical Services in 2003 4 Geotechnical Services in 2002 4 Other Employees Geotechnical Services in 2001 3 Total 12 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (insert revenue index number shown at right) PROFESSIONAL SERVICES REVENUE INDEX NUMBER 1. Less than $100,000 2. $100,000 to less that $250,000 3. $250,000 to less than $500,000 4. $500,000 to less than $1 million 5. $1 million to less than $2 million 6. $2 million to less than $5 million 7. $5 million to less than $10 million 8. $10 million to less than $25 million 9. $25 million to less than $50 million 10. $50 million or greater a. Federal Work B. Non-Federal Work $1,500,000 c. Total Work $1,500,000 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. a. SIGNATURE b. DATE 12/13/19 c. NAME AND TITLE Oracio Riccobono, P.E. AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 5/1/2004 STANDARD FORM 330 (6/2004) PAGE 6 Janus Research, Inc. January 8, 2020 1979 190-0068-NC (SS) 055004881 1107 N. Ward Street Tampa FL 33607 Kenneth Hardin, President 813-636-8200 kenneth_hardin@janus-research.com Corporation Small Business Piper Archaeology 1979 055004881 05 06 02 08 29 Archaeologist 8 Architectural Historian 3 Administrative 3 CADD Technician 1 GIS Specialist 1 H08 E01 Historical Preservation Archaeological Investigations 5 5 16 0 6 6 Kenneth Hardin, President STANDARD FORM 330 (Rev. 8/2016) PAGE 1 ARCHITECT-ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (If any) PART II - GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (or Branch Office) NAME TLC Engineering Solutions, Inc. – South Florida Operations 3. YEAR ESTABLISHED 1955 4. UNIQUE ENTITY IDENTIFIER 05-488-8037 2b. STREET 5757 Blue Lagoon Drive, Suite 400 5. OWNERSHIP 2c. CITY Miami *also 800 Fairway Dr, Ste 250 Deerfield Beach, FL 33441 2d. STATE FL 2e. ZIP CODE 33126 a. TYPE Corporation 6a. POINT OF CONTACT NAME AND TITLE Erick Gonzalez, PE, LEED AP, Principal / Regional Director b. SMALL BUSINESS STATUS N/A 6b. TELEPHONE NUMBER 305.266.6553 6c. E-MAIL ADDRESS erick.gonzalez@tlc-eng.com 7. NAME OF FIRM (If Block 2a is a Branch Office). TLC Engineering Solutions, Inc. 8a. FORMER FIRM NAME(S) (If any) 8b. YEAR ESTABLISHED 8c. UNIQUE ENTITY IDENTIFIER Known as TLC Engineering Solutions, Inc. effective March 2019; previously known as TLC Engineering for Architecture, Inc. In 2015 TLC acquired Allan + Conrad. 1955 05-488-8037 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM’S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function Code b. Discipline c. Number of Employees a. Profile Code b. Experience c. Revenue Index Number (see below) (1) FIRM (2) BRANCH 02 Administrative 53 4 A06 Airports; Terminals & Hangars 6 08 CADD Technicians / Intern 38 3 A11 Auditoriums & Theaters 6 13 Communications Engineer / Specialist / Designer 23 C10 Commercial Bldg (low rise); Shopping center 5 14 Computer Operations / Network Manager 6 E02 Educational Facilities 7 15 Construction Inspector 1 F02 Field Houses; Gyms; Stadiums 4 21 Electrical Engineer / EI / Designer 91 9 G01 Garages; Vehicle Maintenance Facilities; Parking Decks 3 25 Fire / Life Safety Engineer 1 H09 Hospital & Medical Facilities 9 42 Mechanical Engineer / EI / Designer 139 14 H10 Hotels; Motels 6 57 Structural Engineer / EI / Designer 21 H11 Housing 5 I01 Industrial Buildings 4 PEs (included above) 96 9 J01 Judicial and Courtroom Facilities 4 RCDDs (included above) 6 L01 Laboratories; Medical Research Facilities 4 LEED APs (included above) 76 11 L04 Libraries; Museums; Galleries 4 CxAs (included above) 21 1 O01 Office Buildings; Industrial Parks 6 P09 Prisons & Correctional Facilities 3 P13 Public Safety Facilities 5 R03 Railroad; Rapid Transit 5 R04 Recreation Facilities 4 Total 373 30 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) PROFESSIONAL SERVICES REVENUE INDEX NUMBER 1. Less than $100,000 6. $2 million to less than $5 million 2. $100,000 to less than $250,000 7. $5 million to less than $10 million 3. $250,000 to less than $500,000 8. $10 million to less than $25 million 4. $500,000 to less than $1 million 9. $25 million to less than $50 million 5. $1 million to less than $2 million 10. $50 million or greater a. Federal Work 5 b. Non-Federal Work 10 c. Total Work 10 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. a. SIGNATURE b. DATE January 9, 2020 c. NAME AND TITLE Erick Gonzalez, PE, LEED AP, Principal / Regional Director F FIRM REFERENCES AND SIMILAR WORK COMPLETED F.FIRM REFERENCES AND SIMILAR WORK COMPLETED EAC Consulting, Inc. eacconsult.com City of Sunny Isles Beach • RFQ 19-11-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. FIRM REFERENCES AND SIMILAR WORK COMPLETED EAC Consulting, Inc. A. Client Name, Address, Contact, Phone and Fax Numbers and valid e-mail address; B. Project Title C. Description of work performed, including the project location D. Year completed E. Past 5 years copies of executed agreements made between your firm and local municipalities, with a scope similar to this RFQ. City of Miami Gardens Les Pettit, Public Work, City Engineer 305-622-8000 Ext. 2570 lpettit@miamigardens-fl.gov Hard Rock Pedestrian Bridge Design of two pedestrian bridges at Hard Rock Stadium 2020 N/A FDOT District 6 Raul Quintela, Project Manager 305-470-5271 Raul.Quintela@dot.state.fl.us Golden Glades Multimodal Transportation Facility (GGMTF) D/B Project Design of one pedestrian bridge at Golden Glades Multimodal Transportation Facility 2020 N/A FDOT District 5 Leonel Cortés, P.E. 719 S. Woodland Blvd., MS 2-542 DeLand, FL 32720 (386) 943-5408 Leonel.cortes@dot.state.fl.us SR 5/US1 from South St. to Magnolia ShangriLa Dr. Design of two pedestrian bridges at SR 5/US1 2017 N/A EAC Consulting, Inc. eacconsult.com City of Sunny Isles Beach • RFQ 19-11-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. Savino & Miller Design Studio A. Client Name, Address, Contact, Phone and Fax Numbers and valid e-mail address; B. Project Title C. Description of work performed, including the project location D. Year completed E. Past 5 years copies of executed agreements made between your firm and local municipalities, with a scope similar to this RFQ. John De Pazos, Sr. Project Manager, City of Miami Capital Improvement Program Miami Riverside Center 444 S.W. 2nd Avenue, 8th Fl Miami, FL 33130 305-416-1094 305-416-2153 fax jdepazos@miamigov.com Maurice A Ferre Park, Miami, FL Landscape architectural and master planning services for 20- acre waterfront park 2018 N/A David Martinez, Director City of Miami Beach Office of Capital Improvements 1700 Convention Center Drive Miami Beach, FL 305-673-7071 786-394-4103 fax DavidMartinez@miamibeachfl.gov PAR 3 Park, Miami Beach, FL Landscape architectural and master planning services for 20- acre neighborhood park In progress (90% CD)N/A Neal Schafers, Miami Downtown Development Authority Planning, Urban Design & Transportation 200 S Biscayne Blvd, Miami, FL 305-379-6566 305-371-2423 fax schafers@miamidda.com Miami Baywalk & Riverwalk Design Guidelines, Miami, FL Landscape architecture, urban design and master planning services for 5-mile waterfront promenade 2019 N/A EAC Consulting, Inc. eacconsult.com City of Sunny Isles Beach • RFQ 19-11-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. Rosales + Partners, Inc. A. Client Name, Address, Contact, Phone and Fax Numbers and valid e-mail address; B. Project Title C. Description of work performed, including the project location D. Year completed E. Past 5 years copies of executed agreements made between your firm and local municipalities, with a scope similar to this RFQ. MassDOT 10 Park Plaza, Suite 4160 Boston, MA 02116 Jonathan L. Gulliver - Administrator, Highway Division (617) 973-7826 JonathanLGulliver@state.ma.us Frances Appleton Pedestrian Bridge Conceptual, Preliminary Design and visualizations 2018 N/A The University of Texas at Austin Moody College of Communication 110 Inner Campus Drive Austin, TX 78705 Jay M. Bernhardt, PhD, MPH Professor and Dean (512) 471-5646 moody.dean@austin.utexas.edu Moody Pedestrian Bridge Conceptual Design, Final Design, Aesthetic Lighting and Construction Supervision 2016 N/A City of Fort Worth 1000 Throckmorton Street Forth Worth TX 76102 02116 Randle Harwood, Director of Planning and Development (817) 392-6101 randle.harwood@fortworthtexas.gov Phyllis J. Tilley Memorial Bridge Conceptual, Preliminary and Final Design, Lighting Design, Community Participation and Physical Models 2014 N/A EAC Consulting, Inc. eacconsult.com City of Sunny Isles Beach • RFQ 19-11-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. ASA Consultants, Inc. A. Client Name, Address, Contact, Phone and Fax Numbers and valid e-mail address; B. Project Title C. Description of work performed, including the project location D. Year completed E. Past 5 years copies of executed agreements made between your firm and local municipalities, with a scope similar to this RFQ. Astaldi Construction FDOT District 4 Jeffrey Robbert, PE (954) 777-4648 Jeffrey.robbert@dot.state.fl.us 3400 W Commercial Boulevard Fort Lauderdale, Florida 33309 SR 9/I-95 Spanish River Interchange All facets of Professional Engineering Design including Schnabel wall Design, Permitting, and Post Design Services for the addition of a new interchange on I-95 between the Glades Road and Yamato Road Interchanges in Palm Beach County, Florida. 2017 N/A BCC Engineering, Inc. Bob Forand, PE (954) 928-1828 Bforand@bcceng.com 4901 NW 17th Way, Suite 506 Fort Lauderdale, FL 33309 SR9/I-95 3C Design-Build Project All facets of Professional Engineering Design and Post Design Services for the design of five Steel Box Girder bridges (widening and retrofit of existing structures to accommodate express lanes) in Broward County, Florida. Ongoing N/A Calvin, Giordano & Associates, Inc. Bob McSweeney, PE (954) 921-7781 Fax: (954) 921-8807 BMcSweeney@cgasolutions.com 1800 Eller Drive, Suite 600 Ft Lauderdale, Florida 33316 Sunny Isles NB Emergency Bridge All facets of Professional Engineering Design, Permitting, and Post Design Services for the design of an Emergency Pedestrian Bridge in Miami-Dade County, Florida. 2017 N/A AECOM Saul Perez, PE (786) 556-3320 sperez@aecom.com 3201 W Commercial Boulevard, #134 Fort Lauderdale, Florida 33309 I-595 PPP Reversible Lanes Project All facets of Professional Engineering Design, Permitting and Post Design Services for the design of reversible lanes along I-595 in Broward, Florida. 2014 N/A EAC Consulting, Inc. eacconsult.com City of Sunny Isles Beach • RFQ 19-11-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. LARS Engineering, Inc. A. Client Name, Address, Contact, Phone and Fax Numbers and valid e-mail address; B. Project Title C. Description of work performed, including the project location D. Year completed E. Past 5 years copies of executed agreements made between your firm and local municipalities, with a scope similar to this RFQ. A&P Consulting Transportation Engineers, Corp. Erik Sibila, PE 305-283-9816 esibila@APCTE.com Pedestrian Bridge No. 879092 Initial Inspection & Report at Hard Rock Stadium Pedestrian Bridge No. 879092 located at Hard Rock Stadium over Turnpike Access Road. (Miami, FL) December 2019 Private work performed as subconsultant to APCTE FDOT District 6 1000 NW 111 Avenue Miami, FL 33172 Pablo Orozco, PE 305.470.5370 Pablo.Orozco@dot.state.fl.us Districtwide Local Government In-Depth Bridge Inspection On/Off System Responsible for performing visual routine, interim, and initial inspections for various types of bridges (365 total, within Miami Dade and Monroe County) and preparing inspection reports including repair recommendations. On-going Private worked performed as subconsultant to Marlin Engineering Inc. BMA Consulting Engineering 18503 Pines Blvd. Suite 210 Pembroke Pines, Florida 33029 Jesus Mustafa, PE 954.404.6155 jmustafa@bma-ce.com Inspection and Reporting Services to NASA / John F. Kennedy Space Center (KSC) Performed inspection of 55 fixed spans over the Indian River as part of State Road 405, and a double leaf steel bascule main span including the prestressed concrete girder and composite slab approach system, driven prestressed concrete piles with cast in place concrete caps. Prepared inspection reports and repair quantities and assisted in producing repair cost estimate. (Titusville, Florida) August 2019 Private work performed as subconsultant to BMA Consulting Engineering Inc. EAC Consulting, Inc. eacconsult.com City of Sunny Isles Beach • RFQ 19-11-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. Choice Engineering Consultants, Inc. A. Client Name, Address, Contact, Phone and Fax Numbers and valid e-mail address; B. Project Title C. Description of work performed, including the project location D. Year completed E. Past 5 years copies of executed agreements made between your firm and local municipalities, with a scope similar to this RFQ. FDOT D6 Client PM: Tiffany Gehrke (305) 470-5308 ADA D/W Consultant General Engineering Project Manager and Engineer of Record responsible for the implementation/review of ADA improvements performed by the District, ADA Plan Reviews, preparation of construction plans for ADA only improvements to be constructed through the Work Program, technical memos addressing citizen and municipality complaints. Assisted the Department as an in-house consultant supporting the Intermodal Systems Development Office in the coordination of all ADA related activities. Ongoing since 2015 N/A FDOT D6 Client PM: Ivette Funtanellas, PE (305) 470-5270 D/W Traffic Operations & Operations/Safety Engineer of Record responsible for the preparation of contract documents such as design variations, pavement designs and typical section packages as well as the production of construction plans for the implementation of traffic safety and operational improvements including signalization, addition of left turn lanes, extension of storage capacity, signing and pavement marking improvements throughout Miami-Dade County. Ongoing since 2017 N/A FDOT D6 Client PM: Julio Polo (305) 470-5335 Traffic Ops Studies Project Manager responsible for the overall management and performance of traffic engineering services to produce operational studies and other traffic engineering studies (including traffic data collection) to support the Traffic Operations Office and address citizen complaints. This contract also included efforts to support the FDOT with the maintenance and operational takeover of the traffic signals in Monroe County. Ongoing since 2017 N/A EAC Consulting, Inc. eacconsult.com City of Sunny Isles Beach • RFQ 19-11-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. Manny G Vera & Associates, Inc. A. Client Name, Address, Contact, Phone and Fax Numbers and valid e-mail address; B. Project Title C. Description of work performed, including the project location D. Year completed E. Past 5 years copies of executed agreements made between your firm and local municipalities, with a scope similar to this RFQ. O’Leary Richards Design Associates, Inc. 8525 SW 92 Street Ste C11 Miami, Fl 33156 Kathryn O’Leary Richards 305-596-6628 kathy@olearyrichards.com The City of Sunny Isles (RFQ 16-06-02) NW 174 Street Pedestrian Bridge Topographic Survey MGV was responsible for providing a Design Survey consisting of the following deliverables: the establishment of horizontal (NAD 83/90) control as needed, and the creation of Topographic at the intersection of US-1 and 174th Street. All trees were located and identified with common names. 2017 N/A Kimley Horn & Assoc, Inc. 1221 Brickell Ave, Ste 400 Coral Gables, FL 33131 George Puig, PE 305-673-2025 george.puig@kimley-horn.com FDOT District 6, Pedestrian Bridge over Adams Cut in Key Largo, FL MGV was to prepare a complete Design survey which included the establishment of horizontal (NAD 83/90) and vertical control (NAVD 88) networks, survey baseline and right of way, and the creation of Topographic surveys and Digital Terrain Model (DTM/3D). 2013 N/A MCM Corporation 6201 SW 70th Street, 2nd Fl Miami, FL 33143 Eduardo Martinez 305-541-0000 emartinez@mcm-us.com Port of Miami Terminal F MGV provided the following survey services, including: existing condition survey; foundation survey; existing pile survey; new pile layouts and new pile as-builts for 267 auger cast piles; identify existing control points, reference elevation and property line corner stakes; establish control points for building; establish and maintain a minimum of 2 benchmarks; verifying contractor’s elevations of decks (including 3 mobilizations); provide final certificates of elevation; final parcel survey; as-built survey of the building; as- built of boundary and topographic survey; setting grid lines and building corners; drainage survey; and additional elevations on existing pedestrian bridge. 2018 N/A EAC Consulting, Inc. eacconsult.com City of Sunny Isles Beach • RFQ 19-11-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. Geosol, Inc. A. Client Name, Address, Contact, Phone and Fax Numbers and valid e-mail address; B. Project Title C. Description of work performed, including the project location D. Year completed E. Past 5 years copies of executed agreements made between your firm and local municipalities, with a scope similar to this RFQ. Bentley Architects + Engineers, Inc. 651 West Warren Avenue, Suite 200 Longwood, FL 32750 Attn.: Brenton Daily, PE Ph: 407-331-6116 ext. 125 bdaily@baeonline.com Hard Rock Stadium Pedestrian Bridges Bridge #1 Over NW 199th St. & Bridge #2 Over Turnpike Access Road City of Miami Gardens, FL Geosol was the Geotechnical Engineer of Record and performed soil borings, foundation analysis, design, geotechnical report, inspections, & foundation certifications. 2019 N/A HDR, Inc. 15450 New Barn Road, Suite 304 Miami Lakes, FL 3301 Attn.: Erki Suarez, PE, Ph. 305-728-7408 erki.suarez@hdrinc.com Pedestrian Bridge over US-1, Isla Morada Monroe Co., FL FM: 442040-1 Geosol was the Geotechnical Engineer of Record and performed soil borings, foundation analysis, design and prepared geotechnical report. 2018 N/A Keith & Schnars, PA 6500 N. Andrews Ave. Fort Lauderdale, FL 33309 Attn.: Bryan Wilson, PE Ph.: 954-776-1616 CBWilson@ksfla.com West Avenue Bridge and Lincoln Court Pedestrian Bridges Over the Collins Canal City of Miami Beach, FL Geosol was the Geotechnical Engineer of Record and performed soil borings, foundation analysis, design, geotechnical report, inspections, & foundation certifications. 2017 N/A EAC Consulting, Inc. eacconsult.com City of Sunny Isles Beach • RFQ 19-11-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. Smart-Sciences, Inc. A. Client Name, Address, Contact, Phone and Fax Numbers and valid e-mail address; B. Project Title C. Description of work performed, including the project location D. Year completed E. Past 5 years copies of executed agreements made between your firm and local municipalities, with a scope similar to this RFQ. Marlin Engineering Jose Santiago 15600 SW 288th Street, Suite 208 Miami, Florida 33033 305.477.7575 jsantiago@marlinengineering.com Tree Permitting for Citywide Sidewalk Improvements Tree inventory and permitting services at five roadway segments in City of Doral 2019 N/A Miami-Dade County Vizcaya Museum and Gardens Trust Ian Simpkins 3251 South Miami Avenue Miami, FL 33129 305.860.8430 (F) 305.285.2004 ian.simpkins@vizcaya.org Vizcaya Southern Lagoon & Northern Canal Tidal Swamp Landscape Environmental Restoration, Permitting, and Sediment Sampling Landscape environmental restoration, permitting, and sediment sampling of the environmentally sensitive Southern Lagoon and Northern Canal Tidal Swamp within Vizcaya Museum and Gardens. Ongoing N/A Milian Swain and Associates for the City of Hialeah Jorge Torres 2025 SW 32nd Avenue, Suite 110 Miami, FL 33145 305-441-0123 Jtorres@milianswain.com NW 102nd Avenue Roadway Improvements Environmental permitting and contamination assessment services for the portion of NW 102nd Avenue between NW 162nd Street and NW 170th Street, City of Hialeah. Ongoing N/A EAC Consulting, Inc. eacconsult.com City of Sunny Isles Beach • RFQ 19-11-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. Janus Research A. Client Name, Address, Contact, Phone and Fax Numbers and valid e-mail address; B. Project Title C. Description of work performed, including the project location D. Year completed E. Past 5 years copies of executed agreements made between your firm and local municipalities, with a scope similar to this RFQ. Client: FDOT D6 1000 NW 111th Ave, Miami, FL 33172 Contact: Barbara Culhane (305) 470-5179 Section 106 Evaluation and Determination of Effects Case Study Report of Venetian Causeway from North Bayshore Drive in the City of Miami to Purdy Avenue in the City of Miami Beach This project consists of an effects evaluation in relation to the significant historic resources, including the bridges and causeway. The 2019 CRAS resulted in the identification of three significant resources: Collins Canal (8DA11375), Terrace Towers (8DA11754), and the Venetian Islands Resource Group (8DA14395). This report was prepared as part of a project studying several alternatives for the rehabilitation or replacement of the twelve historic Venetian Causeway bridges, which are all contributing to the Venetian Islands Resource Group (8DA14395). Ongoing N/A Client: Kisinger Campo & Associates, 201 North Franklin Street Suite 400, Tampa, Florida 33602 Contact: Jason LaBarbera (813) 871-5331 Duck Key Bridges Study, Monroe County This project consists of a historical documentation, as the MOA stipulated the documentation of four significant bridges. The project included large- format photography, the reproduction of historic drawings using archival-quality supplies, and the production of a final report documenting the work. Ongoing N/A Client: FDOT D6 1000 NW 111th Ave Miami, FL 33172 Contact: Barbara Culhane (305) 470-5179 Project Development and Environment Study Re-Evaluations Interstate 395 from the I-95/Midtown Interchange ramps to MacArthur Causeway West Channel Bridges at Biscayne Bay, Miami FL The Cultural Resources Assessment Survey was prepared as part of the re-evaluation process. Newly identified resources were documented and previously recorded resources were documented as part of this project. In addition, effects were evaluated to determine if the project would impact the significant resources. Completed January 2019 N/A G CORPORATE STANDING AND AUTHORIZED SIGNATORY G.CORPORATE STANDING AND AUTHORIZED SIGNATORY UNANIMOUS JOINT RESOLUTIONS OF THE BOARD OF DIRECTORS AND SOLE SHAREHOLDER OF EAC CONSULTING, INC. IN LIEU OF A SPECIAL MEETING Effective August_, 2015 Pursuant to the Florida Business Corporation Act, the undersigned, being all of the Directors and the sole Shareholder of EAC CONSULTING, INC., a Florida corporation (the "Corporation"), do hereby consent to and adopt the following resolutions in lieu of holding a meeting, waive any notice and direct that this action be filed with the records of the Corporation. WHEREAS, the undersigned desire to amend and restate the Articles oflncorporation and the By-laws of the Corporation; WHEREAS, the undersigned have determined that it is advisable, desirable and in the best interests of the Corporation to so amend the Corporation's Articles oflncorporation and By-laws; WHEREAS, immediately following the filing of the Amended and Restated Articles, the undersigned desire to effectuate an eight hundred for one stock split for its common stock, $0.01 par value per share (the "Common Stock") such that upon such stock split, Enrique A. Crooks shall own 80,000 shares of Common Stock which shall constitute all of the outstanding capital stock of the Corporation (the "Stock Split"); and WHEREAS, the Directors desire to appoint officers of the Corporation. NOW, THEREFORE, BE IT RESOLVED, that the Amended and Restated Articles of Incorporation as previously provided to the undersigned, are hereby approved, adopted and ratified; FURTHER RESOLVED, that the Corporation is authorized and directed to file the Amended and Restated Articles of Incorporation with the Florida Secretary of State; FURTHER RESOLVED, that the Amended and Restated By-laws as previously provided to the Directors, are hereby approved, adopted and ratified by the Directors; FURTHER RESOLVED, that the Stock Split is hereby approved, adopted and ratified; FURTHER RESOLVED, that any and all prior acts of the Board of Directors and officers of the Corporation are hereby ratified, approved and confirmed in all respects as the acts and deeds of the Corporation; {M2979289;5} 28 GRANTS OF AUTHORITY I' ,,,,, �-•-· EAC Consulting, Inc. Dept. Manager/ Deputy Program Director/ Regional Manager Program Director/ Vice President REVENUE PRODUCING CONTRACTS WHERE EAC IS A PRIME OR A SUBCONSUL TANT. Project Specific Agreements Contracts < $200,000 < $2,000,000 Supplementals < $200,000 < $2,000,000 Master (Work Order Driven) Agreements Contracts < $2,000,000 < $10,000,000 Work Orders < $1,000,000 < $4,000,000 Work Order Revisions < $1,000,000 < $4,000,000 TEAMING AGREEMENTS WHERE EAC IS A PRIME OR A SUBCONSULTANT. Fee Based Agreements < 500,000 < $2,000,000 Construction/Project Budget Based Agreements < $5,000,000 < $20,000,000 EXPENSE PRODUCING SUBCONSULTANT AGREEMENTS WHERE EAC IS PRIME Project Specific Subconsultant Agreements Subconsultant Agreement < $200,000 < $2,000,000 Amendment to Subconsultant Agreement < $200,000 < $2,000,000 Master (Work Order Driven) Subconsultant Agreements Master Subconsultant Agreement < $200,000 unlimited Amendment to Master Subconsultant Agreement < $200,000 unlimited Work Orders < $200,000 < $2,000,000 Work Order Revisions < $200,000 < $2,000,000 OTHER CONTRACTS: LEASES (Operating and Capital) n/a n/a SERVICE AGREEMENTS n/a n/a Sr. Vice President < $4,000,000 < $4,000,000 unlimited < $4,000,000 < $4,000,000 < $5,000,000 < $50,000,000 < $4,000,000 < $4,000,000 unlimited unlimited < $4,000,000 < $4,000,000 < $40,000 * < $40,000 * CFO President n/a unlimited n/a unlimited n/a unlimited n/a unlimited n/a unlimited n/a unlimited n/a unlimited n/a unlimited n/a unlimited n/a unlimited n/a unlimited n/a unlimited n/a unlimited < $24,000 unlimited < $24,000 unlimited I hereby grant authority to bind EAC Consulting, Inc. with regards to contracts as stated above. J ,1ho)� Enrique rooks P.E. � Dlte President *requires co-approval with the CFO. EXHIBIT A NAME Enrique Crooks, P.E. Michael Adeife, P.E. Christopher Bucknor, P .E. K.T. Lin, P.E. Marie Chong, CPA Reynaldo Cortez, P.E. Andrew Pierce, PE Huntley Higgins, PE Ramon Borges, PE � ,,,,, � - ·--­EAC Consulting, Inc. POSITION President Sr. Vice President Sr. Vice President Sr. Vice President Sr. Vice President, CFO Program Director Deputy Program Director Department Manager Department Manager As per EAC Consulting's "Gr nts Of Authority", above are the names of those currently holding the referenced positions. Enrique rooks P.E. President 5959 BLUE LAGOON DRIVE · SUITE 410 · MIAMI, FL 33126 · 305.265.5400 January 8, 2020 City of Sunny Isles Re: City of Sunny Isles RFQ19-11-01 Company Signature Authorization To Whom It May Concern: The employees authorized to sign on behalf of EAC Consulting, Inc. for matters related to the City of Sunny Isles are listed on Exhibit A (attached). Sincerely, EAC Consulting, Inc. Marie Chong Secretary, Treasurer GRANTS OF AUTHORITY I' ,,,,, �-•-· EAC Consulting, Inc. Dept. Manager/ Deputy Program Director/ Regional Manager Program Director/ Vice President REVENUE PRODUCING CONTRACTS WHERE EAC IS A PRIME OR A SUBCONSUL TANT. Project Specific Agreements Contracts < $200,000 < $2,000,000 Supplementals < $200,000 < $2,000,000 Master (Work Order Driven) Agreements Contracts < $2,000,000 < $10,000,000 Work Orders < $1,000,000 < $4,000,000 Work Order Revisions < $1,000,000 < $4,000,000 TEAMING AGREEMENTS WHERE EAC IS A PRIME OR A SUBCONSULTANT. Fee Based Agreements < 500,000 < $2,000,000 Construction/Project Budget Based Agreements < $5,000,000 < $20,000,000 EXPENSE PRODUCING SUBCONSULTANT AGREEMENTS WHERE EAC IS PRIME Project Specific Subconsultant Agreements Subconsultant Agreement < $200,000 < $2,000,000 Amendment to Subconsultant Agreement < $200,000 < $2,000,000 Master (Work Order Driven) Subconsultant Agreements Master Subconsultant Agreement < $200,000 unlimited Amendment to Master Subconsultant Agreement < $200,000 unlimited Work Orders < $200,000 < $2,000,000 Work Order Revisions < $200,000 < $2,000,000 OTHER CONTRACTS: LEASES (Operating and Capital) n/a n/a SERVICE AGREEMENTS n/a n/a Sr. Vice President < $4,000,000 < $4,000,000 unlimited < $4,000,000 < $4,000,000 < $5,000,000 < $50,000,000 < $4,000,000 < $4,000,000 unlimited unlimited < $4,000,000 < $4,000,000 < $40,000 * < $40,000 * CFO President n/a unlimited n/a unlimited n/a unlimited n/a unlimited n/a unlimited n/a unlimited n/a unlimited n/a unlimited n/a unlimited n/a unlimited n/a unlimited n/a unlimited n/a unlimited < $24,000 unlimited < $24,000 unlimited I hereby grant authority to bind EAC Consulting, Inc. with regards to contracts as stated above. J ,1ho)� Enrique rooks P.E. � Dlte President *requires co-approval with the CFO. EXHIBIT A NAME Enrique Crooks, P.E. Michael Adeife, P.E. Christopher Bucknor, P .E. K.T. Lin, P.E. Marie Chong, CPA Reynaldo Cortez, P.E. Andrew Pierce, PE Huntley Higgins, PE Ramon Borges, PE � ,,,,, � - ·--­EAC Consulting, Inc. POSITION President Sr. Vice President Sr. Vice President Sr. Vice President Sr. Vice President, CFO Program Director Deputy Program Director Department Manager Department Manager As per EAC Consulting's "Gr nts Of Authority", above are the names of those currently holding the referenced positions. Enrique rooks P.E. President h VARIATIONS/EXCEPTIONS H.VARIATIONS/EXCEPTIONS EAC Consulting, Inc. eacconsult.com City of Sunny Isles Beach • RFQ 19-11-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. VARIATIONS / EXCEPTIONS H. Variations/Exceptions: Provide a list of services which are not included in the firm’s proposal to the required services as outlined in the Scope of Ser vices along with any exceptions or variations to any section of the proposal and explanation. Not Applicable I LITIGATION STATEMENT I.LITIGATION STATEMENT 5959 BLUE LAGOON DRIVE · SUITE 410 · MIAMI, FL 33126 · 305.265.5400 EAC Consulting, Inc. Litigation History Below is EAC Consulting’s Litigation history over the last five (5) years. Caption of the matter Case no. Court Description Resolution 2015 Monroe County v. CGC and Metric Engineering with EAC, as the design engineer added as one of three defendants in a minor civil lawsuit styled; CGV v Monroe County, EAC and Shari Ramirez, P.E., arising out of a dispute between a client, its construction contractor and its construction inspection engineer. 15-CA- 000563- P Circuit Court of the Sixteenth Judicial Circuit in and for Monroe County, Florida. Parties: Monroe County / Construct Group Corp. Metric Engineer in a breach of contract action with EAC and Shari Ramirez added for professional negligence. The case was settled and concluded at mediation with EAC offering a minor amount of $25,000 towards a much larger settlement of the matter. Final Order of Dismissal was entered on October 19th, 2016. 2015 Great American Insurance Company as Subrogee of Northgate Condominium Association Inc., v. EAC Consulting Inc., JVA Engineering Contractor Inc. and City of North Miami. 2015- 024371- CA-01 Circuit Court of the Eleventh Judicial Circuit in and for Miami- Dade County, Florida. Parties: Great American Insurance Company as Subrogee for the Northgate Condominium Associations' sued three defendants; the Contractor, JVA, the Owner; the City of North Miami and EAC for negligence. The matter was settled at mediation with EAC offering to pay its one third share of $6,000 and one half of the City’s share in the amount of $3,000 as for the City’s alleged claim for indemnification. The other half of the City’s share was paid by the Contractor. Settlement Agreements were entered into in total for $9,000 and Stipulation for Dismissal of the case was done on July 18th, 2016. 5959 BLUE LAGOON DRIVE · SUITE 410 · MIAMI, FL 33126 · 305.265.5400 2019 F.R. Aleman and Associates Inc., as Claimant against EAC Consulting Inc., as the Respondent. 01-19- 0002- 1379 American Arbitration Association (AAA) Parties: Sub-Consultant, F.R. Aleman and Associates Inc., alleged breach of contract arising out of extra As-Built Surveying work claims against the Prime Consultant, EAC Consulting Inc. as members of a design-built team with Contractor, Ric-Man Construction, Florida on a Project known as “Replacement of Water Mains and Service Conversions in the Shenandoah Area” of Miami- Dade County for the Miami- Dade County Water and Sewer Department. Pending an evidentiary hearing yet to be scheduled with AAA for damages alleged to be greater than $15,000. EAC Consulting, Inc. has not been debarred or suspended from bidding or proposing on a procurement project by any government entity during the last five (5) years. Certified By: __________________________________ _____ Print Name and Title: Marie Chong, CFO date who is authorized to sign on behalf of EAC Consulting, Inc. 12-10-19 J FORMS AND ATTACHMENTS J.FORMS AND ATTACHMENTS City of Sunny Isles Beach |Request for Qualifications No. 19-11-01 26 REQUIRED FORMS (Please type) PRIME FIRM SUB-CONSULTANTS Respondent intends to use the following sub-consultant on this project (if none, write “None”): Role Name of Individual Assigned to Project: Role/Description of Work: Experience: Name and address of sub-consultant: Name and address of sub-consultant: Role Name of Individual Assigned to Project Number of Years’ Experience Education, Degree Address of office: Principle-in- Charge: Project Manager Asst. Project Manager Other Key Member Other Key Member Other Key Member Harold Desdunes, PE K.T. Lin, PhD., P.E. Stephanie Romero, PE 5959 Blue Lagoon Drive, Suite 410, Miami, FL 33126 5959 Blue Lagoon Drive, Suite 410, Miami, FL 33126 5959 Blue Lagoon Drive, Suite 410, Miami, FL 33126 Rosales + Partners, Inc.10 Derne Street Boston, MA 02114 Savino and Miller Design Studio 12345 NE 6th AvenueNorth Miami, FL 33161 Architectural Landscape BS 33 Ph.D BS13 33 City of Sunny Isles Beach |Request for Qualifications No. 19-11-01 27 Name and address of sub-consultant: Name and address of sub-consultant: Name and address of sub-consultant: Name and address of sub-consultant: Please use additional pages if needed. REFERENCES Name Entity Providing Reference Phone # Email Address ASA Consultants, Inc.510 Shotgun Road, Suite 402 Sunrise, FL 33326 LARS Engineering, Inc.7225 NW 25 Street, Suite 211 Miami, FL 33122 Choice Engineering Consultants, Inc.12855 SW 132nd Street, Suite 200 Miami, FL 33186 Manny G Vera & Associates, Inc. 13960 SW 47th Street, Miami, FL 33175 Structural Engineering Bridge Inspection Traffic Engineering & Operations Studies/Design Surveying Please refer to Section F City of Sunny Isles Beach |Request for Qualifications No. 19-11-01 27 Name and address of sub-consultant: Name and address of sub-consultant: Name and address of sub-consultant: Name and address of sub-consultant: Please use additional pages if needed. REFERENCES Name Entity Providing Reference Phone # Email Address GEOSOL, Inc.5795-A NW 151st Street, Miami Lakes, FL 33014 JANUS RESEARCH1107 N. Ward StreetTampa, Florida 33607 Soils, Foundations & Materials Testing Smart-Sciences 330 SW 27th Avenue Suite 504Miami, FL 33135 Environmental Cultural Resources MEP Services Please refer to Section F TLC Engineering Solutions, Inc.5757 Blue Lagoon, Suite 400Miami, Florida 33126 City of Sunny Isles Beach |Request for Qualifications No. 19-11-01 28 PROJECT VERIFICATION FORM Respondent must have completed the design and permitting of at least one (1) pedestrian bridge project in the past ten (10) years. The completed projects meeting this minimum qualification may have been performed by the individual, firm, or project manager assigned to the Work. PLEASE TYPE. 1)Name of Client Entity: ______________________________________________ Address: __________________________________________________________ City/State/Zip: ______________________________________________________ Contact: __________________________________________________________ Title: _____________________________________________________________ Email Address:____________________________________________________ Telephone: ________________________________________________________ Scope of Work: _____________________________________________________ Contract Start/End Dates: _____________________________________________ Consultant Contract Amount: $_________________________________________ 2)Name of Client Entity: ______________________________________________ Address: __________________________________________________________ City/State/Zip: ______________________________________________________ Contact: __________________________________________________________ Title: _____________________________________________________________ Email Address:____________________________________________________ Telephone: ________________________________________________________ Scope of Work: _____________________________________________________ Contract Start/End Dates: _____________________________________________ Consultant Contract Amount: $_________________________________________ 3)Name of Client Entity: ______________________________________________ Address: __________________________________________________________ City/State/Zip: ______________________________________________________ Contact: __________________________________________________________ Title: _____________________________________________________________ Email Address:_____________________________________________________ Telephone: ________________________________________________________ Scope of Work: _____________________________________________________ Contract Start/End Dates: _____________________________________________ Consultant Contract Amount: $_________________________________________ END OF SECTION City of Miami Gardens 18605 NW 27th Avenue Miami Gardens, FL 33056 Les Pettit Public Work City Engineer lpettit@miamigardens-fl.gov 305-622-8000 ext. 2570 Design of 2 Pedestrian Bridges at Hard Rock Stadium July 2018-January 2020 514,908 City of Sunny Isles Beach |Request for Qualifications No. 19-11-01 29 DELIVER TO: City of Sunny Isles Beach City Clerk 18070 Collins Avenue, 4th Floor Sunny Isles Beach, FL 33160 REQUEST FOR QUALIFICATIONS SECTION 6 RESPONDENT SUBMITTAL FORMS OPENING: 2:30 P.M. Friday, December 20, 2019 NOTE: City of Sunny Isles Beach is exempt from all taxes (Federal, State, and Local). Tax Exemption Certificate furnished upon request. Issued by: Purchasing Agent Genesis Cuevas Date issued: 11/20/2019 This Qualification Submittal Consists of all required forms, including SF330, Questionnaires, Acknowledgements and Affidavits Submissions are subject to the Terms and Conditions of this Request for Qualifications and the accompanying Submittal. Such other contract provisions, specifications, drawings or other data as are attached or incorporated by reference in the Submittal, will be received at the office of the City Clerk at the address shown above until the above stated time and date, and at that t ime, publicly opened for furnishing services described in the accompanying Submittal Requirement. RFQ No. 19-11-01 RFQ 19-11-01 PROFESSIONAL ENGINEERING AND ARCHITECTURAL SERVICES FOR PEDESTRIAN BRIDGE WITH PARK ELEMENTS ACROSS A1A AT 174TH ST. CCNA Firm Name ________________________________________ Commodity Code(s): RETURN ONE ORIGINAL AND FOUR COPIES OF QUALIFICATION SUBMITTAL PAGES AND AFFIDAVITS FAILURE TO SIGN PAGE 32 OF SECTION 6 QUALIFICATION SUBMITTAL WILL RENDER YOUR SUBMISSION NON-RESPONSIVE RESPONDENT SUBMITTAL FORM: EAC Consulting, Inc. City of Sunny Isles Beach |Request for Qualifications No. 19-11-01 30 ACKNOWLEDGEMENT OF ADDENDA INSTRUCTIONS: COMPLETE PART I OR PART II, WHICHEVER APPLIES PART I: LIST BELOW ARE THE DATES OF ISSUE FOR EACH ADDENDUM RECEIVED IN CONNECTION WITH THIS RFQ Addendum #1, Dated Addendum #2, Dated Addendum #3, Dated Addendum #4, Dated Addendum #5, Dated Addendum #6, Dated Addendum #7, Dated Addendum #8, Dated PART II: NO ADDENDUM WAS RECEIVED IN CONNECTION WITH THIS RFQ FIRM NAME: AUTHORIZED SIGNATURE: DATE: TITLE OF OFFICER: EAC Consulting, Inc. December 9, 2019 December 13, 2019 1/6/2020 President ADDENDUM # 1 DATE: December 9, 2019 TO: ALL PROPOSERS FROM: Purchasing Agent TITLE: RFQ 19-11-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements across A1A at 174TH ST. CCNA SUBJECT: Addendum No. 1 BID SUBMITTAL DEADLINE: Friday, December 20, 2019 at 2:30 PM Please attach this addendum to the documents in your possession and include the Acknowledgement of Addenda form with your response incorporated in the RFQ. This addendum is and does become a part of the RFQ 19-11-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174TH ST. CCNA. Questions & Answers: Q1. Can you please tell me if there is an estimated budget available? A: Plans & Studies total budget is $1,995,000 (FY19 budget $1,495,000 + FY20 budget $500,000) and anticipated total project amount is $13,050,000 (have to include what’s already been spent in 2018). Q2. Also, I was wondering if there is an anticipated start date for construction? A: Below is the tentative schedule: Design – April 2021 Right of Way Certification – December 2021 Construction contract to be let – October 2022 Completion – March 2024 Q3. As per section 2.9.4 of the RFQ No. 19-11.01, the Professional Liability Insurance required might be a problem for our team to be able to submit our SOQ. We do comply with evert other item on the solicitation but in discussions with our insurance brokers our increased Professional Liability from $2M to $10M would be very expensive for our office to consider. Would the City consider reducing the requirement to $2M? A: The $10M minimum professional liability insurance will remain the same. ADDENDUM # 2 DATE: December 13, 2019 TO: ALL PROPOSERS FROM: Purchasing Agent TITLE: RFQ 19-11-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements across A1A at 174TH ST. CCNA SUBJECT: Addendum No. 2 BID SUBMITTAL DEADLINE: Friday, December 20, 2019 at 2:30 PM Monday, January 13, 2020 at 2:30 PM Please attach this addendum to the documents in your possession and include the Acknowledgement of Addenda form with your response incorporated in the RFQ. This addendum is and does become a part of the RFQ 19-11-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174TH ST. CCNA. Questions & Answers: Q1. NOTE on Page 11: The City of Sunny Isles, Contract Number and Title must be on each Certificate of Insurance (COI). The City of Sunny Isles Beach must be shown as additional insured. Our insurance company doesn’t typically issue COIs containing this specific information until contract negotiations. Would the City accept a letter from our insurance company stating that our firm has the ability to comply 100% with your specific request or a sample insurance certificate at this time in lieu of the requirement stated above? If so, we would provide a COI that names the City as additional insured and includes The City of Sunny Isles, Contract Number and Title during contract negotiations. A1. Proof of insurance will suffice prior to contract award. Q2. Page 19, 2nd paragraph: Firm shall be pre-qualified with FDOT in the following classes of work by the by the time the agreement is fully executed: Work Group 3. Highway Design Roadway Work Group 4. Highway Design – Bridges Work Group 5. Bridge Inspection Work Group 6. Traffic Engineering & Operations Studies Work Group 7. Traffic Operations Design Work Group 8. Surveying & Mapping Work Group 9. Soil Exploration, Material Testing and Foundations Work Group 14. Architect Work Group 15. Landscape Architect Does the prime “firm” have to be prequalified in ALL work groups themselves? Or can the proposed “team” cover ALL of these work groups? A2. The answer is no the prime firm does not need to be prequalified in all work groups themselves. Sub-consultants can cover work groups however, based on the FHWA 1273 form, the prime contractor shall perform with its own organization contract work amounting to not less than 30 percent (or a greater percentage if specified elsewhere in the contract) of the total original contract price. Q3. Calvin, Giordano & Associates asked at the RFQ conference if they may submit a response to the RFQ, although they prepared the 174th Street Pedestrian Overpass Planning and feasibility studies that was attached to the RFQ. A3. Yes, Calvin, Giordano & Associates is permitted to submit a sealed response to the RFQ for review. Q4. Will the due date of December 20 be changed? A4. The RFQ opening has been extended to Monday, January 13, 2020. Q5. On page 12 of the RFQ it specifies that “The sub-consultant is subject to the same contractual conditions as is the Respondent”, we understand under the contractual conditions but not on the $10 million dollar Professional Liability Insurance requirement, correct? Do sub-consultants also have to carry insurance? A5. It has been confirmed that only the awarded firm has to maintain insurance. The City is not in privity of contract with any sub-consultant. If an issue arises, the City will look to the Consultant’s insurance. Addition to Section 2.9: The insurance policy must remain active from the time of contract award, to 5 years after project completion. EQUAL OPPORTUNITY / AFFIRMATIVE ACTION City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 EQUAL OPPORTUNITY/AFFIRMATIVE ACTION STATEMENT The contractors and all subcontractors hereby agree to a commitment to the principles and practices of equal opportunity in employment and to comply with the letter and spirit of federal, state, and local laws and regulations prohibiting discrimination based on race, color, religion, national region, sex, age, handicap, marital status, and political affiliation or belief. Signed: ________________________________________ Title: ________________________________________ Firm: ________________________________________ Address: ________________________________________ ________________________________________ 4 of 8 President LARS Engineering, Inc. 7225 NW 25 ST, Suite 211 Miami, FL 33122 ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED? INSR ADDL SUBR LTR INSD WVD PRODUCER CONTACT NAME: FAXPHONE (A/C, No):(A/C, No, Ext): E-MAIL ADDRESS: INSURER A : INSURED INSURER B : INSURER C : INSURER D : INSURER E : INSURER F : POLICY NUMBER POLICY EFF POLICY EXPTYPE OF INSURANCE LIMITS(MM/DD/YYYY)(MM/DD/YYYY) AUTOMOBILE LIABILITY UMBRELLA LIAB EXCESS LIAB WORKERS COMPENSATION AND EMPLOYERS' LIABILITY DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) AUTHORIZED REPRESENTATIVE EACH OCCURRENCE $ DAMAGE TO RENTEDCLAIMS-MADE OCCUR $PREMISES (Ea occurrence) MED EXP (Any one person)$ PERSONAL & ADV INJURY $ GEN'L AGGREGATE LIMIT APPLIES PER:GENERAL AGGREGATE $ PRO-POLICY LOC PRODUCTS - COMP/OP AGGJECT OTHER:$ COMBINED SINGLE LIMIT $(Ea accident) ANY AUTO BODILY INJURY (Per person)$ OWNED SCHEDULED BODILY INJURY (Per accident)$AUTOS ONLY AUTOS HIRED NON-OWNED PROPERTY DAMAGE $AUTOS ONLY AUTOS ONLY (Per accident) $ OCCUR EACH OCCURRENCE CLAIMS-MADE AGGREGATE $ DED RETENTION $ PER OTH- STATUTE ER E.L. EACH ACCIDENT E.L. DISEASE - EA EMPLOYEE $ If yes, describe under E.L. DISEASE - POLICY LIMITDESCRIPTION OF OPERATIONS below INSURER(S) AFFORDING COVERAGE NAIC # COMMERCIAL GENERAL LIABILITY Y / N N / A (Mandatory in NH) SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). COVERAGES CERTIFICATE NUMBER:REVISION NUMBER: CERTIFICATE HOLDER CANCELLATION © 1988-2015 ACORD CORPORATION. All rights reserved.ACORD 25 (2016/03) CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY) $ $ $ $ $ The ACORD name and logo are registered marks of ACORD 12/16/2019 (703) 827-2277 (703) 827-2279 30104 EAC Consulting, Inc. 5959 Blue Lagoon Drive Suite 410 Miami, FL 33126 27120 29424 13056 19437 A 1,000,000 42UUNNI2075 4/22/2019 4/22/2020 300,000 Contractual Liab.10,000 1,000,000 2,000,000 2,000,000 1,000,000B 42UUNNI2075 4/22/2019 4/22/2020 2,000,000C 42XHUNI0417 4/22/2019 4/22/2020 2,000,000 10,000 D PSW0003090 4/22/2019 4/22/2020 1,000,000 Y 1,000,000 1,000,000 E Professional 27015056 4/22/2019 Per Claim 5,000,000 E Liability 27015056 4/22/2019 7/1/2020 Aggregate 10,000,000 Proposal Purposes Only EACCONS-01 DLONG Ames & Gough 8300 Greensboro Drive Suite 980 McLean, VA 22102 admin@amesgough.com Hartford Underwriters Insurance Company A+ (XV) Trumbull Insurance Company A+ (XV) Hartford Casualty Insurance Company A+ (XV) RLI Insurance Company A+, XII Lexington Insurance Company A, XV X 7/1/2020 X X X X X X X X   Ames & Gough  8300 Greensboro Drive, Suite 980  McLean, VA 22102  Phone: (703) 827‐2277  Fax: (703) 827‐2279    December 16, 2019    LETTER OF INTENT (INCREASED LIMITS)      EAC Consulting, Inc.  5100 NW 33rd Avenue  Suite, 243  Fort Lauderdale, FL 33309    Re: Increased Professional Liability Limits Letter (EAC Consulting, Inc.)   City of Sunny Isles Beach    To Whom It May Concern,     This letter serves to confirm my conversation with your underwriter at Lexington Insurance Company.  We understand that you are responding to an RFQ for City of Sunny Isles Beach which is requiring limits  of Professional Liability coverage of $10M per claim/$10M annual aggregate.  EAC currently carries a  $5m per claim / $10m aggregate professional liability limit.  In the event that EAC is awarded the  project, EAC Consulting can secure an additional $5M per claim via a Specific Additional Limit  Endorsement (SALE) which would provide a total of $10M per claim/$10M annual aggregate for the  project.     As always, if you have any questions, please do not hesitate to let me know.     Best regards,     Thomas Marchetti  Vice President & Partner  EAC Consulting, Inc. eacconsult.com City of Sunny Isles Beach • RFQ 19-11-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. LICENSES EAC Consulting, Inc. Minority Business Certification EAC Consulting Inc. 10/17/2019 10/17/2021 EAC Consulting, Inc. eacconsult.com City of Sunny Isles Beach • RFQ 19-11-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. LICENSES EAC Consulting, Inc. EAC Consulting, Inc. eacconsult.com City of Sunny Isles Beach • RFQ 19-11-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. LICENSES EAC Consulting, Inc. Halsey Beshears, SecretaryRon DeSantis, Governor STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF PROFESSIONAL ENGINEERS THE ENGINEERING BUSINESS HEREIN IS AUTHORIZED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES EAC CONSULTING, INC. Do not alter this document in any form. 5959 BLUE LAGOON DRIVE LICENSE NUMBER: CA7011 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. SUITE 410 MIAMI FL 33126 Always verify licenses online at MyFloridaLicense.com Halsey Beshears, SecretaryRon DeSantis, Governor STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES DYER, DARREN GEOFFREY Do not alter this document in any form. 12491 SW 123RD TERRACE LICENSE NUMBER: PE73951 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. MIAMI FL 33186 Always verify licenses online at MyFloridaLicense.com JONATHAN ZACHEM, SECRETARYRICK SCOTT, GOVERNOR STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES RODRIGUEZ, EVELYN LINETTE Do not alter this document in any form. 2351 DOUGLAS ROAD LICENSE NUMBER: PE78548 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. APT 909 MIAMI FL 33145 Always verify licenses online at MyFloridaLicense.com Halsey Beshears, SecretaryRon DeSantis, Governor STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES HIGGINS, HUNTLEY GLENMORE Do not alter this document in any form. 14255 NW 21 STREET LICENSE NUMBER: PE60726 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. PEMBROKE PINES FL 33028 Always verify licenses online at MyFloridaLicense.com Halsey Beshears, SecretaryRon DeSantis, Governor STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES WANG, NING Do not alter this document in any form. 6827 NW 110TH WAY LICENSE NUMBER: PE66993 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. PARKLAND FL 33076 Always verify licenses online at MyFloridaLicense.com EAC Consulting, Inc. eacconsult.com City of Sunny Isles Beach • RFQ 19-11-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. LICENSES EAC Consulting, Inc. Halsey Beshears, SecretaryRon DeSantis, Governor STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES DEVERA, RODNEY C. Do not alter this document in any form. 4600 SW 67TH AVENUE, UNIT 111 LICENSE NUMBER: PE71384 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. MIAMI FL 33155 Always verify licenses online at MyFloridaLicense.com Halsey Beshears, SecretaryRon DeSantis, Governor STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES BORGES, RAMON Do not alter this document in any form. 1141 NW 134 AVE LICENSE NUMBER: PE61622 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. MIAMI FL 33182 Always verify licenses online at MyFloridaLicense.com Halsey Beshears, SecretaryRon DeSantis, Governor STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES CROOKS, ENRIQUE ALEXANDER Do not alter this document in any form. 723 CRANDON BLVD. APT. #406 LICENSE NUMBER: PE42528 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. KEY BISCAYNE FL 33149 Always verify licenses online at MyFloridaLicense.com Ron DeSantis, Governor STATE OF FLORIDA BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES SHIRAZI, SATIAR A. Do not alter this document in any form. 320 JEFFERSON AVENUE LICENSE NUMBER: PE75734 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. APT. 4 MIAMI BEACH FL 33139 Always verify licenses online at MyFloridaLicense.com Ron DeSantis, Governor STATE OF FLORIDA BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES ROMERO, STEPHANIE Do not alter this document in any form. 3360 NW 91ST AVENUE LICENSE NUMBER: PE77593 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. DORAL FL 33172 Always verify licenses online at MyFloridaLicense.com EAC Consulting, Inc. eacconsult.com City of Sunny Isles Beach • RFQ 19-11-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. LICENSES EAC Consulting, Inc. Halsey Beshears, SecretaryRon DeSantis, Governor STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES LI, CHUN Do not alter this document in any form. 2008 ISLAND CIRCLE LICENSE NUMBER: PE63052 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. WESTON FL 33326 Always verify licenses online at MyFloridaLicense.com Halsey Beshears, SecretaryRon DeSantis, Governor STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES ADEIFE, MICHAEL ADEBOWALE Do not alter this document in any form. 815 NW 57 AVENUE LICENSE NUMBER: PE56094 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. SUITE 402 MIAMI FL 33126 Always verify licenses online at MyFloridaLicense.com EAC Consulting, Inc. eacconsult.com City of Sunny Isles Beach • RFQ 19-11-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. LICENSES Savino & Miller Design Studio, PA EAC Consulting, Inc. eacconsult.com City of Sunny Isles Beach • RFQ 19-11-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. LICENSES Rosales + Partners, Inc. EAC Consulting, Inc. eacconsult.com City of Sunny Isles Beach • RFQ 19-11-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. LICENSES ASA Consultants, Inc. Ron DeSantis, Governor STATE OF FLORIDA BOARD OF PROFESSIONAL ENGINEERS THE ENGINEERING BUSINESS HEREIN IS AUTHORIZED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES ASA CONSULTANTS, INC. Do not alter this document in any form. 510 SHOTGUN ROAD LICENSE NUMBER: CA30932 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. SUITE 402 SUNRISE FL 33236 Always verify licenses online at MyFloridaLicense.com EAC Consulting, Inc. eacconsult.com City of Sunny Isles Beach • RFQ 19-11-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. LICENSES LARS Engineering, Inc. Ron DeSantis, Governor STATE OF FLORIDA BOARD OF PROFESSIONAL ENGINEERS THE ENGINEERING BUSINESS HEREIN IS AUTHORIZED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES LARS ENGINEERING, INC. Do not alter this document in any form. 7225 NW 25 ST LICENSE NUMBER: CA32816 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. UNIT 211 MIAMI FL 33122 Always verify licenses online at MyFloridaLicense.com EAC Consulting, Inc. eacconsult.com City of Sunny Isles Beach • RFQ 19-11-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. LICENSES Choice Engineering Consultants, Inc. JONATHAN ZACHEM, SECRETARYRICK SCOTT, GOVERNOR STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF PROFESSIONAL ENGINEERS THE ENGINEERING BUSINESS HEREIN IS AUTHORIZED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES CHOICE ENGINEERING CONSULTANTS, INC. Do not alter this document in any form. 12855 SW 132ND ST LICENSE NUMBER: CA31116 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. SUITE 202 MIAMI FL 33186 Always verify licenses online at MyFloridaLicense.com JONATHAN ZACHEM, SECRETARYRICK SCOTT, GOVERNOR STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES FRANCIS, CARLOS Do not alter this document in any form. 8960 SW 120 STREET LICENSE NUMBER: PE51364 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. MIAMI FL 33176 Always verify licenses online at MyFloridaLicense.com Halsey Beshears, SecretaryRon DeSantis, Governor STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES LOPEZ, EUGENIO SEBASTIAN Do not alter this document in any form. 7457 SW 104 PLACE LICENSE NUMBER: PE68213 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. MIAMI FL 33173 Always verify licenses online at MyFloridaLicense.com EAC Consulting, Inc. eacconsult.com City of Sunny Isles Beach • RFQ 19-11-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. LICENSES Manuel G. Vera & Associates, Inc. EAC Consulting, Inc. eacconsult.com City of Sunny Isles Beach • RFQ 19-11-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. LICENSES Geosol, Inc. Halsey Beshears, SecretaryRon DeSantis, Governor STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF PROFESSIONAL ENGINEERS THE ENGINEERING BUSINESS HEREIN IS AUTHORIZED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES GEOSOL, INC. Do not alter this document in any form. 5975-A NW 151ST STREET LICENSE NUMBER: CA8530 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. MIAMI LAKES FL 33014 Always verify licenses online at MyFloridaLicense.com Halsey Beshears, SecretaryRon DeSantis, Governor STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES ISMAIL, ADNAN A. Do not alter this document in any form. 17916-C NW 67TH AVENUE, C LICENSE NUMBER: PE76014 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. HIALEAH FL 33015 Always verify licenses online at MyFloridaLicense.com Halsey Beshears, SecretaryRon DeSantis, Governor STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES RICCOBONO, ORACIO Do not alter this document in any form. 5168 LAKEWOOD DRIVE LICENSE NUMBER: PE49324 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. COOPER CITY FL 33330 Always verify licenses online at MyFloridaLicense.com EAC Consulting, Inc. eacconsult.com City of Sunny Isles Beach • RFQ 19-11-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. LICENSES Smart-Sciences, Inc. EAC Consulting, Inc. eacconsult.com City of Sunny Isles Beach • RFQ 19-11-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. LICENSES Janus Research State of Florida Department of State I certify from the records of this office that JANUS RESEARCH,INC.is a corporation organized under the laws of the State of Florida,filed on August 29, 1969. The document number of this corporation is 351512. I further certify that said corporation has paid all fees due this office through December 31,2020,that its most recent annual report/uniform business report was filed on January 2,2020,and that its status is active. I further certify that said corporation has not filed Articles of Dissolution. Given under my hand and the Great Seal of the State of Florida at Tallahassee,the Capital,this the Second day of January,2020 Tracking Number:2545865615CC To authenticate this certificate,visit the following site,enter this number,and then follow the instructions displayed. https://services.sunbiz.org/Filings/CertificateOfStatus/CertificateAuthentication EAC Consulting, Inc. eacconsult.com City of Sunny Isles Beach • RFQ 19-11-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. LICENSES TLC Engineering Solutions Ron DeSantis, Governor STATE OF FLORIDA BOARD OF PROFESSIONAL ENGINEERS THE ENGINEERING BUSINESS HEREIN IS AUTHORIZED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES TLC ENGINEERING SOLUTIONS, INC. Do not alter this document in any form. 255 SOUTH ORANGE AVE LICENSE NUMBER: CA15 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. SUITE 1600 ORLANDO FL 32801 Always verify licenses online at MyFloridaLicense.com JONATHAN ZACHEM, SECRETARYRICK SCOTT, GOVERNOR STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES BAEZA, RALPH Do not alter this document in any form. 930 OPAL TERRACE LICENSE NUMBER: PE42641 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. WESTON FL 33326 Always verify licenses online at MyFloridaLicense.com CONTACT K.T. Lin, PE, PhD klin@eacconsult.com • 305.265.5400 5959 Blue Lagoon Drive, Suite 410 • Miami, FL 33126