HomeMy WebLinkAboutAdd No 11
ADDENDUM # 1
DATE: Friday, July 17, 2020
TO: ALL PLANHOLDERS
FROM: Purchasing Administrator
BID NO.: RFQ 20-07-01 Continuing Professional Consulting Services (CCNA)
SUBJECT: Addendum No. 1
BID SUBMITTAL DEADLINE: Tuesday, August 11, 2020 at 2:30 PM
Please attach this addendum to the documents in your possession and include the Acknowledgement
of Addenda form with your response incorporated with the Request for Qualifications.
Revisions: (Note: Deletions will be indicated by strikethrough, additions will be
indicated with bold font):
Q1. We do not have an architecture license, but do have a landscape architecture license
and would like to submit for landscape architecture services. Please confirm that a registered
Landscape Architecture firm can submit under Category 1—Architects.
A1. The City is currently not soliciting for landscape architecture services under this
continuing RFQ.
Q2. Is LEED accreditation required if the respondent has and includes their professional
license or is LEED accreditation required in addition to license?
A2. LEED accreditation would be in addition to professional license.
Q3. Re: SECTION 1: INSTRUCTIONS TO RESPONDENTS / GENERAL TERMS AND
CONDITIONS, 1.24 CERTIFICATE (S) OF INSURANCE: “At the time of Firms submission
the Firm must submit certificates of insurance as outlined in the General Conditions section.
All required insurances shall name the City of Sunny Isles Beach as additional insured and
such insurance shall be issued by companies authorized to issue insurance in the State of
Florida.” Do certificates naming the City as an additional insured need to be submitted with
the RFQ response or are specimen certificates evidencing proof of coverage acceptable,
provided the required certificates are submitted in the event of contract award?
A3. Evidence of proof of coverage is acceptable at the time of submittal however, upon
contract award the COI must have the City listed as an additional insured.
Q4. Section 2.6.1 LICENSING REQUIREMENTS: “At a minimum, Respondents must have
at least one (1) team member accredited in the United States Green Building Council
Leadership in Energy and Environmental Design (LEED).” Is Envision Sustainability
Professional (ENV SP) certification acceptable as a substitute? As civil engineers, this
certification is more applicable to our potential scopes of work than LEED.
A4. Yes for engineering disciplines.
Q5. Section 5.0 FORMAT: E. Qualification Information and Assigned Personnel requests
submission of “Form SF330, include Part I and Part II” and F. Firm References and Similar
Work Completed requests submission of Qualification Statement, resumes for proposed
2
personnel, project experience, organizational chart, etc. As these items are included in the
SF 330, does the City want the information repeated in both sections?
A5. Firms may submit the SF 330 in lieu of resumes.
Q6. Section 5.0 FORMAT, F. Firm References and Similar Work Completed, “The title and a
brief description of each project and/or service shall include:… Item e. - Past 5 years copies
of executed agreements made between your firm and local municipalities, with a scope
similar to this RFQ. If sub-consultants are a part of the proposed work plan, include items A
through E for each firm, including an organizational chart showing the relationship between
the responding firm and the sub firm(s).” Does the City want executed agreements included
for each project submitted as relevant experience, for each firm (prime and subs)? They are
generally lengthy.
A6. Due to the length of these agreements, if your firm has an active contract/PO within the
past 5 years with local municipalities please state the agency’s name, project scope and
contract amount in lieu of attaching the contract(s).
Q7. Does the City want copies of professional licenses included in Section E. Qualification
Information and Assigned Personnel or Section H. Forms and Attachments?
A7. Section E.
Q8. Pg. 12 of the above referenced RFQ states on page 12 (see attached) that at least 1
Team member must be LEED Accredited. However we are a Structural Engineering Firm
and as such LEED is not applicable to our services. Therefore no one on our staff Is LEED
Accredited. Please advise if this precludes our firm from submitting for this solicitation. Thank
you.
A8. No, LEED would apply to architectural prime consultants.
Q9. We are an environmental consulting firm interested in pursuing the subject RFQ for the
“Environmental Engineering” discipline. However, Section 2.6.1 of the RFQ appears to
eliminate us from eligibility and so I’m writing for some clarification. We are not an
engineering, architecture, or landscape architecture firm. Our services are not regulated by
the Florida Department of Business and Professional Regulation and so we could not meet
the requirements of the last bullet of section 2.6.1, although we are properly registered and in
compliance with the State of Florida (Division of Corporations). Is it the City’s intent for the
“Environmental Engineering” discipline to only be serviced by licensed engineering firms?
I recognize the scope could be interpreted to focus on Phase I/Phase II Environmental
Assessments, in which case we would not be qualified. But the broad description of
“monitoring and mitigation, environmental studies and reports” and the permitting scope are
commonly used to describe our work, albeit associated with wetlands, protected wildlife
species, and water quality. I wanted to be sure this wasn’t an opportunity we were missing
due to a technicality the City didn’t intend.
A9. Environmental firms must comply with the requirements set forth in Section 2.6.1. of the
RFQ, including that they be registered and in compliance with the State of Florida in addition
to being licensed and registered with the Department of Business and Professional
Regulation to practice in their profession in the State of Florida.
3
Q10. We are pursuing the Civil Engineering Category. Civil engineering projects may require
geotechnical, survey, environmental, and/or materials testing services, etc. Does the City
want us to submit a team with these potential subconsultants or use the firms selected in
those categories under this solicitation if awarded a task order requiring those disciplines?
A10.Yes, please submit your list of sub-consultants.
Q11. Page 33 of the RFQ asks for Commodity Codes. Does this refer to the categories or
does the City want NAICS codes listed on the form?
A11. You may leave this section blank.
Q12. Does the City require separate submittals for pursuing multiple scopes?
A12. No, just make sure to indicate in section 6.1 the categories your firm is applying for.
Q13. Can we submit only for the marine structures aspect of the Structural Engineering
scope? Or would we have to pursue the entire category, including building structures?
A13. You will need to submit for full structural services.
Q14. Is it possible to submit under coastal/marine engineering being that that is our area of
expertise?
A14. Firm may submit under Environmental Engineering category.
Q15. In the RFQ on page 1, it states all questions are due on Friday, July 17, 2020 by 5:00
PM. On page 3 it states, “All questions regarding this Request for Qualifications No. 20-07-
01 shall be directed in writing to Mauricio Betancur, CMC, City Clerk, Friday, July 24, 2020.”
Can you please clarify if questions are due on July 17, 2020 by 5:00 PM or July 24, 2020?
A15. The questions due date is Friday, July 24, 2020.
Q16. Landscape Architect is listed under licensing requirements on page 11 - 12 of the RFQ,
which category should Landscape Architecture submit under?
A16. The City is currently not soliciting for landscape architecture services under this
continuing RFQ.
Q.17 Surveyors and Mapping is listed in the scope of services, on page 11 - 12 it does not state licensing requirements for Surveying. To pursue for Surveyors and Mapping, can you please clarify if the firm and/or individual needs to be licensed?
A17. The firm and/or individual needs to be registered in the State of Florida to engage in
the practice of surveying and mapping under this contract.
Q18. Under 2.6.1 Licensing Requirements, it states that the firm shall possess at minimum one
of the following licenses; however, on the list, it also states that "at a minimum, respondents
must have at least one LEED certified professional. Do you require all respondents to have a
LEED certified professional in the team?
4
A18. Please refer to question # 8.
Q19. What would be scope of the LEED certified professional?
A19. Please refer to question # 8.
Q20. Subconsultants may be inherent to work for several of the categories listed. For
example, Civil Engineering may often require other support services (i.e. Survey,
Geotechnical, MEP, Structural, Architecture, etc.). Shall we include any/all subconsultants
we may need in order to accomplish any given task under this contract?
A20. Yes, please submit your list of sub-consultant(s).
Q21. Please elaborate on what , specifically. The City is looking for under Item E (i.e.
performance records of key personnel, work orders, copies of contracts). Are contracts being
requested or work orders for specific projects undertaken under continuing service
contracts?
A21. Please refer to question # 6.
Q22. Does The City want individual project references or continuing service contracts
references for this RFP?
A22. Please refer to question # 6.
Q23. Please elaborate on the first paragraph under Section E. Please differentiate which
questions are geared towards key personnel and which questions are geared towards the firm,
as they cannot be interchanged.
A23. This information may be filled out according to the SF 330.
Q24. Please elaborate on the following statement on page 31:
“If sub-consultants are a part of the proposed work plan, include items A through E for each
firm, including an organizational chart showing the relationship between the responding firm
and the sub firm(s).”
A24. Please include sub-consultant(s) qualifications as well with RFQ response, as required
on page 31.