HomeMy WebLinkAboutReso 2020-3064 RESOLUTION NO. 2020 - 3 0(Alf
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF
SUNNY ISLES BEACH, FLORIDA, RATIFYING A FIRST AMENDMENT
TO THE AGREEMENT WITH CRAVEN THOMPSON & ASSOCIATES,
INC. TO PROVIDE ENGINEERING CONSULTING SERVICES FOR
THE GOLDEN SHORES UTILITY UNDERGROUNDING AND
ROADWAY IMPROVEMENTS PROJECT, IN AN AMOUNT NOT TO
EXCEED TWELVE THOUSAND FIVE HUNDRED DOLLARS
($12,500.00), ATTACHED HERETO AS EXHIBIT "A"; AUTHORIZING
THE CITY MANAGER TO DO ALL THINGS NECESSARY TO
EFFECTUATE THIS RESOLUTION; PROVIDING FOR AN EFFECTIVE
DATE.
WHEREAS, the City issued and advertised RFQ No. 18-08-01 for Consulting
Engineering Services for Golden Shores Utility Undergrounding and Roadway Improvements
("Services"), for which five (5) responses were received; and
WHEREAS, on November 15th, 2018 via Resolution No. 2018-2889, the City
Commission ranked and authorized the City Manager to begin negotiating with the first ranked
firm of Craven Thompson& Associates, Inc. ("Craven Thompson"); and
WHEREAS, on July 18th, 2019 via Resolution No. 2019-2964, the City Commission
approved an Agreement with Craven Thompson to provide the specified Services, in an amount
not to exceed $922,605.00; and
WHEREAS,the City Manager has determined that additional services not included in the
original Scope of Work are required to attain project completion; and
WHEREAS, the City Commission wishes to approve a First Amendment to the
Agreement with Craven Thompson & Associates, Inc. to provide additional professional
engineering consulting services for the Golden Shores Utility Undergrounding and Roadway
Improvements project, in an amount not to exceed Twelve Thousand Five Hundred Dollars
($12,500.00), bringing the total contract amount not to exceed Nine Hundred Thirty-Five
Thousand One Hundred Five Dollars ($935,105.00), attached hereto as Exhibit"A".
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF SUNNY ISLES BEACH,FLORIDA, AS FOLLOWS:
Section 1. Ratification of First Amendment. The City Commission hereby ratifies a First
Amendment to the Agreement with Craven Thompson & Associates, Inc. to provide additional
professional engineering consulting services for the Golden Shores Utility Undergrounding and
Roadway Improvements project, in an amount not to exceed Twelve Thousand Five Hundred
Dollars ($12,500.00), bringing the total contract amount not to exceed Nine Hundred Thirty-Five
Thousand One Hundred Five Dollars ($935,105.00), attached hereto as Exhibit "A".
R2020 First Amend W Craven Thompson For Golden Shores Undergrounding Page 1 of 2
T
Section 2. Authorization of City Manager. The City Manager is hereby authorized to do all
things necessary to effectuate this Resolution.
Section 3. Effective Date. This Resolution will become effective upon adoption.
PASSED AND ADOPTED this 18th d of Jine 2020.
George H. Scholl, Mayor
ATT ti:
-;-4rAimaki
Mauri 6'o::et. cur,.CMC, City Clerk
APPROVED S TO FORM
A LE IJ SUFFICIENCY
kdward A. Dion, City Attorney
Moved by: ritVU4Rianirr— VtSt.411.4,./ Seconded by: COVIOttc LAR- +
Vote:
Mayor Scholl (Yes) (No)
Vice Mayor Svechin I (Yes) (No)
Commissioner Goldman ✓ (Yes) (No)
Commissioner Lama /(Yes) (No)
Commissioner Viscarra J(Yes) (No)
R2020 First Amend W Craven Thompson For Golden Shores Undergrounding Page 2 of 2
FIRST AMENDMENT TO THE AGREEMENT BETWEEN
THE CITY OF SUNNY ISLES BEACH AND
CRAVEN THOMPSON&ASSOCIATES,INC.
CONTRACT NO.2019-7174-1
This First Amendment to the Agreement between the CITY OF SUNNY ISLES BEACH
("City") and CI.VEN THOMPSON & ASSOCIATES, INC. ("Consultant"), executed this
day of ,2020 is made a part of the original Agreement between the parties
dated 18`h day of July, 2019, Contract No. 2019-7174 (the "Agreement"), a copy of which is
attached hereto as Attachment"A", and the City and the Consultant, whose Federal Identification#
is 59-0948029,hereby agree to amend the Agreement as follows:
1. SCOPE OF SERVICES. Pursuant to Section 18(E) of the Agreement, the City
hereby wishes to amend Section 2("Services")of the Agreement to include additional professional
services for design and preparation of construction documents for lighting along Collins Avenue,
as more particularly described in Attachment`B",!which is attached hereto and incorporated herein
by reference("Additional Services").
2. COMPENSATION. Section 4 of the Agreement is hereby amended to reflect
compensation for Additional Services in a lump sum amount of Twelve Thousand Dollars
($12,000.00), and reimbursable expenses in an amount not to exceed Five-Hundred Dollars
($500.00), for a revised total contract amount not to exceed Nine Hundred Thirty Five Thousand
One Hundred Five Dollars($935,105.00).
3. PROHIBITION AGAINST CONTRACTING WITH SCRUTINIZED
COMPANIES. Pursuant to Florida Statutes Section 287.135,contracting with any entity that is
listed on the Scrutinized Companies that Boycott Israel List or that is engaged in the boycott of
Israel is prohibited.Contractors must certify that the company is not participating in a boycott of
Israel. Any contract for goods or services of One Million Dollars($1,000,000) or more shall be
terminated at the City's option if it is discoveredthat the entity submitted false documents of
' certification, is listed on the Scrutinized Companies with Activities in Sudan List,the Scrutinized
Companies with Activities in the'Iran Petroleum Energy Sector List, or has been engaged in
business operations in Cuba or Syria after July 1,2018.
Any contract entered into or renewed after July 1,2018 shall be terminated at the City's option if
the company is listed on the Scrutinized Companies that Boycott Israel List or engaged in the
boycott of Israel. Contractors must submit the certification that is attached to this agreement as
Attachment"C". Submitting a false certification shall be deemed a material breach of contract.
The City shall provide notice,in writing,to the Contractor of the City's determination concerning
the false certification. The Contractor shall have ninety (90)days following receipt of the notice
to respond in writing and demonstrate that the determination was in error. If the Contractor does
not demonstrate that the City's determination of false certification was rade in error,then the City
shall have the right to terminate the contract and seek civil remedies pursuant to Florida Statute
-— Section-287.-135.— ---..._....._........ . ._.._.. _.._.....- - - - - _
4. OTHER PROVISIONS REMAIN IN EFFECT. Except as specifically
modified herein,all terms and conditions of the Agreement shall remain in full force and effect.
4
5. CONFLICTING PROVISIONS. The terms, statements, requirements, or
• provisions contained in this First Amendment shall prevail and be given superior effect and priority
over any conflicting or inconsistent term, statement, requirement,or provision contained in any
other document or attachment, including but not limited to the Agreement.
IN WITNESS WHEREOF, the parties have executed this First Amendment to•the
Agreement as of the date referenced above.
TNESS: CRAVEN TEL SON&ASSOCIATES,INC.
By:
. Signatur: As its Is(4
1i2 ,
- I • Il: o1'
Print La
ll
CITY OF SUNNY ISLES BEACH
A itorlit
:
By: � p
Mauri 'o :e •t our,City Clerk Zes4v/tAel R U cs0
APPROVED AS TO FORM AM) Gi•y *rage r
LEGAL SUFFICIENCY
Edward A.Dion,City Attorney
•
•
2
:;iii
February 20,2020
(Revised March 5,2020)
Mr.Paul Abbott
City of Sunny Isles Beach
18070 Collins Avenue
Sunny Isles Beach,Florida 33160
RE: AGREEMENT FOR PROFESSIONAL SERVICES
COLLINS AVENUE ROADWAY LIGHTING,SUNNY ISLES BEACH,FLORIDA
CTA PROPOSAL NO.2020-H06.064(REVISED)
Dear Mr.Abbott:
The firm of Craven Thompson & Associates, Inc. (CTA) is pleased to provide you
with the following revised proposal for professional services for lighting along
Collins Avenue. This project supplements existing lighting, expanding
approximately 2,000'to the north. This is a City undertaking,independent of FDOT.
CRAVEN 1HOMPSON Lighting will be owned,operated,and installed by the City.
This project involves lighting design and preparation of construction documents.
6(1;11II. The intent is to use existing conduit installed with the Collins Avenue overhead
conversion project to power the additional lights. This project will extend lighting
along Collins Avenue from Sta. 119+00 to Sta. 130+00 on both sides of the road
(refer to Exhibit'A'for stationing and conduit plans).
SCOPE OF SERVICES
&ASSOCIATES INC Our scope of services is as follows:
Engineers p
Planners This scope of services assumes the City to provide electronic files, in CAD format,of
Surveyors the Collins Avenue Overhead Conversion project for use as a base in preparing
Landscape Architects
construction documents. The Lighting design shall utilize City / FOOT approved
luminaries & poles. Plans will reflect pole locations and services. Construction
administration, permitting, and/or coordination with FDOT, soil borings and
detailed restoration of surface features is not included."
I. ENGINEERING SERVICES
1.1 Lighting Design(Provided by Hillers Electrical Engineering(HEE))
Utilizing the base file referenced above, HEE will prepare design
plans based upon City / FDOT design standards. Lighting
calculations reflecting proposed roadway widening/project limits
shall be per FDOT/City criteria. City intends to use luminaries
similar to those currently within Collins as well as light pole bases
and existing conduit provided with the Collins overhead conversion
', project. As such, plans will reference base design by others and V .
utilize existing conduit where _possible to' avoid disruption to__,-
surface features/improvements. Construction Phase services are
not included in lighting design. Review of Bids and
3563 NW 53rd Street recommendations for award are included.
Fort Lauderdale, FL 33309-6311
Phone:(954)739-6400 Lump Sum $12,000.00
Fax:(954)739-6409
•
Mr. Paul Abbott
CTA Proposal No.2020-H07.064(Revised)
March 5,2020
Page 2
II. REIMBURSABLE EXPENSES
2.1 Reimbursable Expenses(CTA Task No.XPEN)
Reimbursable expenses shall include printing, mylars, copying, postage, photographic
services, long distance phone calls,Federal Express and courier services.
Estimated Budget $500.00
TOTAL FEES(including Reimbursable Expenses) $12,500.00
INFORMATION PROVIDED BY CITY:
• City of Sunny Isles Beach, Conduit Placement Plans, prepared by Keith and Schnars, April 29, 2016,
Revision 16(dated 6/8/17)or later,in CAD format including all associated reference.files.
■ Permit/design fees by outside agencies, if applicable,are to be paid by City.
■ Design assumes sufficient R/W and/or easements exist for proposed lighting. Easement sketch and
description and/or processing is not included.
■ General Conditions and generic bid package to be provided by CITY. Specifications not anticipated
due to project scale and circumstances. CTA to provide plans and tabulation for bidding.
•
CRAVEN•1HOMPSON &ASSOCIATES INC.
•
•
Mr. Paul Abbott
CTA Proposal No.2020-H07.064(Revised)
• March 5,2020
Page 3
Scope of Services
. • The scope of services is limited by the specific terms of this proposal. Except as stated specifically herein,no other service will
be provided except as"extra work",subject to the fees hereinafter set forth.
In reviewing this proposal for professional services, it should be understood that the above proposal items and their
corresponding fees do not necessarily represent the full scope of services required for the project. Rather, it represents our
best effort to set forth those services which we believe to be those requested by you, the Client, and/or those we can
determine to be needed to accomplish a particular objective. However,we recognize and we ask that the Client recognize that
as a project progresses the scope of service as originally defined may change In content to include work not initially identified.
Several factors will cause this to happen:
1. Additional requirements identified by the Client.
2. New laws or governmental agency requirements.
As these influences occur and are identified,we will advise you of same and seek your direction as to how you wish to proceed.
Work required as a result of the above will be"extra work"outside of the original scope of services. Upon your direction,we
will perform the work under the"Hourly Fee Schedule"section of this proposal or we can provide you with a separate proposal
should the scope so indicate.
Hourly Fee Schedule
Civil Engineering Services
Principal Engineer $200/Hour
Senior Supervising Engineer $185/Hour
Senior Engineer $135/Hour
. Project Engineer $115/Hour
Engineering Senior CADD Technician $95/Hour
Land Surveying&Mapping Services
Principal Surveyor $165/Hour
Professional Land Surveyor $125/Hour
Project Surveyor $115/Hour
Survey CADD/GIS Tech $85/Hour
Survey Field Crew(1-Man Crew) $92/Hour
Survey Field Crew(2-Man Crew) $130/Hour
Survey Field Crew(3-Man Crew) $160/Hour
Survey Crew with Laser Scan(3-Man Crew) $260/Hour
Landscape Architecture and Planning Services
Principal Landscape Architect/Principal Planner $165/Hour
Senior Supervising Landscape Architect $150/Hour
Senior Landscape Architect $135/Hour
Landscape Architect $125/Hour
Project Landscape Designer $115/Hour
Project Planner $115/Hour
Construction Administration Services
Director of Construction Management $145/Hour
Construction Manager $130/Hour
Senior Field Representative • $95/Hour
Field Representative $85/Hour
,Miscellaneous
Clerical $75/Hour
—.......–. - ---
__Hourly-Charges
•
Hourly work will be billed at our current prevailing rates; however, upon written notice and mutual agreement between the
City and Craven Thompson&Associates,these are subject to change due to increasing labor and material costs. Hourly work
performed outside of normal business hours will be billed at one and a half times the current rates for overtime. The firm's
normal business hours are from 8:00 a.m.to 5:00 p.m.,Monday through Friday.
CRIMEN•1HOMPSON&ASSOCIATES INC
•
Mr. Paul Abbott
CTA Proposal No. 2020-H07.064(Revised)
March 5,2020
Page 4
Lump Sum Fees
• The Lump Sum Fees set forth above are applicable for the period of four years as identified in RFQ No.18-08-01 from the date
of this proposal. If the work on any item to which a lump sum fee shall apply is not commenced within said period,the firm
reserves the right to terminate this Agreement as it relates to said item. If the work is initiated but not concluded within said
period,regardless of the reason therefore,the balance of the fee due may be increased at the rate of one percent(1%)per
month for each month the work continues until the work is complete or as mutually agreed to by the City and Craven
Thompson&Associates.
Cost Estimates
In that our firm does not have control over the cost of labor and materials, or over competitive bidding and marketing
conditions, the estimates of construction costs provided by our firm will be made on the basis of our experience and
•qualifications,but our firm does not guarantee the accuracy of the estimates of probable cost as compared to the contractor's
bids. The firm recommends that you consult with the other professionals which you have employed in connection with the
project.
Ownership of Documents
All documents including,but not limited to,drawings and specifications prepared in connection with the project constitute the
work product of the firm and a portion of the instruments of service with respect to the project. Such documents and/or
specifications constitute a portion of the integral services provided by the firm and,as such,are not intended or represented to
be suitable for reuse by you or others or for extensions of the project or in connection with any other project. The firm
specifically disclaims any responsibility and/or liability for or in connection with the reuse of such documents and/or
specifications or any use thereof beyond the scope of the Project as set forth herein. By your execution of this proposal,you
agree to indemnify and hold the firm harmless from all claims, damages, losses and expenses including, but not limited to,
attorneys fees arising out of or resulting from the reuse or extended use of such documents or specifications.
Permits and Approvals
The permits and agency approvals mentioned above are those known to us to be required for projects of this kind,and we will
apply for them as indicated. However, our experience has shown us that agencies and regulatory authorities do not always
communicate new regulations and legislation properly and that the enforcement of policies can vary. The Client is therefore
cautioned that additional permits or approvals other than those presently identified may be required. Should this arise,we will
notify you and respond promptly to the requirement.
Construction Requirements
At the time that the firm is authorized by you to perform professional engineering services involving design plans and permit
requiring approval by governmental agencies,the firm will be required to provide certificates of compliance to those agencies
with regard to the performance of certain aspects of the work, which performance will be rendered by others. It will be
necessary, therefore,for the firm to perform full-time observation regarding some items and to make periodic site visits for
other items to determine whether or not the improvements are in "substantial compliance" with the relevant contract
documents.
It shall be your responsibility to notify the firm of the commencement of any work so that the firm may perform the necessary
inspections and observations. The amount of time required for such inspections and observations and for the completion of
•the applicable certifications will be dictated by the performance of the contractor. Moreover,and in addition to the required
site visits,the firm must alsoprepare review the as-built drawings during and at the end of the construction period. All-e#
The firm shall not be responsible for the quality or quantity of the work,the execution thereof,the techniques or sequences of
construction,the safety and security of the project or the maintenance thereof. The firm is not a guarantor or insurer of the
work of others and assumes no duty in connection therewith. In performing the services required of it,the firm will use that
:degree of care and skill ordinarily exercised,under similar circumstances,by reputable members of its profession practicing in
r the same or similar_L2cality._.No other--warranty,._express.`or._Implied,.is.made..or_intended-by-the-firm-by-virtue-of-the-------------- • - -
(undertakings or of its performance of the service hereunder. Absent bad faithin the performance of the work hereunder,the
tfirm shall not be liable for any damages resulting from misfeasance in the performance of any work with regard to the project.
I No person other than you shall have the right to rely on the expertise of the firm or the performance of the matters set forth
herein. The firm reserves the right to record a memorandum hereof in the public records of the County.
CRFNEN•1HO/VIPSON&ASSOCIATES INC
•
Mr. Paul Abbott
CTA Proposal No.2020-H07.064(Revised)
March 5,2020
Page 5
The above stated services are the minimum level of services that the firm is obligated to perform. The firm currently provides a
complete range of construction-related services which it will be happy to discuss with you at the time that your project is ready
for construction.
Permit Fees;Application Fees;Outside Consultant Fees
The service fees set forth herein do not include the payment of governmental agency submittal fees,review fees or permit fees,
or any other charges assessed by said agencies. Further,the service fees do not include the cost of services provided by others.
These fees shall be paid for by the Client. Should our firm find it absolutely necessary to advance fees for the Client;said fees
shall be reimbursed along with a service and handling fee upon receipt of the invoice for same.
Direct Charges
Unless otherwise specified,the above service fees do not include the following direct charges:
1. Blue prints,mylars and xeroxing will be billed at current price schedule per print copy.
2. Postage,Federal Express,photographic services for enlargements,reductions,etc.:At Cost plus 10%handling charge.
Assignment
It should be expressly understood that this proposal is for the use of the executing Client and is not assignable or assumable by
any third party.
LIABILITY
PURSUANT TO F.S. 558.0035, AN INDIVIDUAL EMPLOYEE OR AGENT MAY NOT BE
HELD INDIVIDUALLY LIABLE FOR NEGLIGENCE.
Invoicing and Payment
Work will be Invoiced at the end of each month based on a proration of work completed to date,with payment expected upon
receipt of the invoice by the Client. Client shall notify firm within ten(10)days of receipt of invoice should invoice be found to
be unacceptable. Any invoice for which firm is not so notified shall be deemed to be acceptable for purposes of payment by
Client.
If payment is not received within 45 days of the invoice date,Consultant may terminate this agreement or suspend work under
the agreement without further notice, and a late charge of one and one-half percent(1-1/2%) per month on outstanding
balance shall accrue until delinquent balance is paid. Client agrees to pay all costs of collection,including reasonable Attorney
fees,should such action be required.
Client's Responsibilities
1. The Client shall provide full information regarding requirements for the project including a program,which shall set
forth the design objectives,constraints and expendability,special equipment and systems and site requirements.
2. Due to the nature of proposed work,the services of soil engineers or other consultants are not deemed necessary. If
Client decides to incorporate such services,they shall be furnished by Client.Such services shall include test borings,
test pits,soil bearing values, percolation tests,air and water pollution tests, ground corrosion and resistivity tests,
including necessary operations for determining subsoil, air and water conditions, with reports and appropriate
professional recommendations.
3. The Client shall furnish structural, mechanical, chemical and other laboratory tests, inspections and reports as
required by law or the Contract Documents.
4. The Client shall furnish a Legal Description of the property and the appropriate Title Information.
. i s 5. The;Client shall execute all permit applications. As"Permittee",or"applicant"or"holder",Owner shall be responsible
forpcomplying with the conditions of all permits issued. In particular,Client shall be responsible for the safety of the —
General Public during construction.
CRRIEN•1HOMPSON&ASSOCIATES INC
•
Mr. Paul Abbott
CTA Proposal No.2020-H07.064(Revised)
March 5,2020
Page 6
Acceptance
This proposal and fee schedules are based on acceptance within 30 days of the date of preparation. If
not accepted by you within that time-period, we reserve the right to re-evaluate the terms and
conditions contained herein.
If the proposed work and fees contained herein are agreeable with you, please sign the enclosed copy of
this letter and return same to our office. Should you have any questions regarding the above, please do
not hesitate to call.
Sincerely,
CRAVEN THOMPSON&ASSOCIATES,INC.
7,,.- ---- }. .• •
TIM J. HALL, P.E. PAT`IC .'. ':NEY,P.E.
Senior Supervising Engineer Vice P .esi `nt, Engineering
TJH/tg
ACCEPTANCE OF PROPOSAL: The above fees, terms, conditions, and specifications are satisfactory and
are hereby accepted. You are authorized to do the work as specified. Payment will be made as
outlined.
THIS PROPOSAL ACCEPTED BY:
Name&Title
Firm Name
Date
Telephone Number
Facsimile Number
CRINEN•1HOA'1PSON&ASSOCIATES INC.