Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Saltz Michelson Architects
3501 GRIFFIN ROAD • FORT LAUDERDALE, FLORIDA 33312 • 954.266.2700 • WWW.SALTZMICHELSON.COM • SMA@SALTZMICHELSON.COM RFQ 20-07-01 CITY OF SUNNY ISLES BEACH CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) ARCHITECTURE August 18, 2020 PREPARED FOR: CITY OF SUNNY ISLES BEACH BY: Charles A. Michelson, AIA, ACHA, LEED AP President SALTZ MICHELSON ARCHITECTS, INC. 3501 Griffin Road Fort Lauderdale, FL 33312 T: 954.266.2700 E: SMA@SaltzMichelson.com Copy 3501 GRIFFIN ROAD • FORT LAUDERDALE, FLORIDA 33312 • 954.266.2700 • WWW.SALTZMICHELSON.COM • SMA@SALTZMICHELSON.COM PREPARED BY: Charles A. Michelson, AIA, ACHA, LEED AP President SALTZ MICHELSON ARCHITECTS, INC. 3501 Griffin Road Fort Lauderdale, FL 33312 T: 954.266.2700 E: SMA@SaltzMichelson.com SENIOR PROJECT MANAGER: Sheff L. Devier, AIA TITLE PAGEA. RFQ 20-07-01 CITY OF SUNNY ISLES BEACH CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) ARCHITECTURE August 18, 2020 TABLE OF CONTENTS B. Table of Contents 3 C. Cover Letter and Executive Summary 4 D. Project Approach and Understanding 8 E. Qualification Information and Assigned Personnel 15 F. Firm References and Similar Work Completed 76 G. Corporate Standing and Authorized Signatory 88 H. Forms and Attachments 91 A. Title Page 2 COMMUNITY CHARRETTE TO “REIMAGINE THE RIVERWALK CENTER” FAU SCHOOL OF ARCHITECTURE - FORT LAUDERDALE, FLORIDA B. COVER LETTER & EXECUTIVE SUMMARY C. COVER LETTER & EXECUTIVE SUMMARYA. August 18, 2020 City Clerk Sunny Isles Beach Government Center 18070 Collins Avenue Sunny Isles Beach, FL 33160 RE: Continuing Professional Consulting Services (CCNA) | RFQ No. 20-07-01 Dear Members of the Selection Committee: On behalf of our firm, Saltz Michelson Architects, Inc. (SMA), we are pleased to submit our qualifications for the City of Sunny Isles Beach Continuing Professional Consulting Services RFQ. As demonstrated throughout this proposal, we understand the nature and scope of the services requested, and we are committed to providing the City with all of the necessary resources to complete your projects ON TIME, WITHIN BUDGET, and IN ACCORDANCE WITH THIS CONTRACT. Founded in 1976, SMA is an award-winning architectural firm and AIA Florida/Caribbean “2019 Firm of the Year” providing a full range of architectural design and planning services. Our available staffing consists of 29 professionals — including 7 registered architects (4 of which are LEED accredited professionals). The combined knowledge and expertise of the entire Saltz Michelson Architects Team will ensure a consistent standard of design and quality for each of your projects. Understanding of the Work Since our inception, SMA has accumulated an extensive list of open-ended contracts with multiple government and other public agencies — as such, we understand the unique needs of these different and diverse types of projects and have the experience to respond. From planned capital improvements, modernization projects and design criteria to reroofs, ADA upgrades, problem solving, leak solving problems, etc. to remediation and repair after storms, you need a firm with the capability to respond. Having seven registered architects locally available, we have the staffing and over 200 years of accumulated architectural experience to offer the City of Sunny Isles Beach. Experience with Continuing Services Contracts Public contracts are our area of expertise - we have an extensive list of continuing services contracts with multiple public agencies, including with Broward County (27 years), Memorial Healthcare System (25 consecutive years), Miami- Dade County Public Schools (11 schools), and numerous other public entities; as such, we understand the unique needs of these types of projects. Below is a sampling of some of our past and present continuing service contracts. Specific project examples are illustrated throughout this proposal. • State of Florida Department of Health (Miami): Old Highway Patrol building, dentistry conversion, space planning, generator for Miami lab, administrative offices • Miami Dade College: North campus Building 1000 - deferred maintenance project • Miami-Dade County Public Schools: Renovations to 11 schools including Shenandoah Middle historical preservation • Broward County (27 Years): Transit support center, office renovations, hazardous waste drop-off, Judicial Complex, reports & studies, parking garage structural inspections, fire station programming, EOC, learning lab • Memorial Healthcare System (25 Years): A/E design services for all six of their hospitals and other facilities throughout the county including offices, cancer centers, women's centers, urgent care facilities, LEED AP services, and many more 3501 GRIFFIN ROAD • FORT LAUDERDALE, FLORIDA 33312 • 954.266.2700 • WWW.SALTZMICHELSON.COM • SMA@SALTZMICHELSON.COM COVER LETTER & EXECUTIVE SUMMARYA. Technological Resources Our technological ability is state-of-the-art. Our 3D capabilities, using Revit and other programs, allow us to present 3D modeling, graphics, and animation throughout the design of our buildings. Our construction documents are reviewed in three dimensions as well through clash detection analysis in order to provide an improved construction document to the Client. Our recently completed BARC Facility for Broward County was the first completed BIM project for the County. TEAM The SMA Team will provide the City of Sunny Isles Beach with quality and value - including prompt and accurate delivery of documents as well as careful project administration and construction observation throughout the duration of each project. In addition, the current and projected WORKLOADS of the entire SMA Team will allow this contract to receive priority for service and staffing. Our proposed supporting team of consultants below has worked with us on numerous successful public projects and is experienced in all facets of expertise required by your RFQ: • Holland Engineering, Inc.: Civil Engineering (M/WBE) • Miller Legg & Associates, Inc.: Survey, Landscape Architecture, Environmental • Kamm Consulting, Inc.: MEP/FP Engineering • Reliance Engineering, Inc.: Structural Engineering (M/WBE) • Dave Bodker Landscape Architecture/Planning, Inc.: Landscape Architecture • Federal Engineering & Testing, Inc.: Geotechnical Engineering Strengths of the SMA Team As a local firm with specific, relevant experience, and in conjunction with our decades of expertise and reliability, SMA is the “right size" firm to provide you with personal service as well as principal involvement. The strengths of the SMA Team include: • Architectural firm and team of consultants with vast renovation and new construction experience under continuing service contracts including fire stations, parks, community centers, government centers, and recreational facilities, among others • 44 years successfully working throughout South Florida • Reputation for successful and timely project delivery of unique, award-winning, functionally-efficient buildings delivered within budget • A strong team of Consultants with whom we have worked for many years on hundreds of projects • Depth of personnel such that projects under this contract can be started and successfully executed according to your schedule and budgetary requirements Saltz Michelson Architects commits to providing the best possible combination of talent and experience to the City of Sunny Isles Beach. We understand that if selected, our firm is willing to meet any location, budget, or task order. We respectfully submit our qualifications and look forward to the opportunity of making a personal presentation to you. Thank you for your consideration. Very truly yours, Saltz Michelson Architects, Inc. Charles A. Michelson, AIA, ACHA, LEED AP, President 3501 GRIFFIN ROAD • FORT LAUDERDALE, FLORIDA 33312 • 954.266.2700 • WWW.SALTZMICHELSON.COM • SMA@SALTZMICHELSON.COM AIA FLORIDA/CARIBBEAN 2019 FIRM YEAR of the COVER LETTER & EXECUTIVE SUMMARYA. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 7 A. Current & Projected Workload y Skilled Nursing Facility, Doral y SAC Renovation for the City of Sunrise y Broward County North Broward Mass Transit Bus Lift, Pompano Beach y Boynton Atrium Nursing Facility y IVF Medical Offices, Coral Gables y Sports Medicine Center, Cypress Creek y Broward County Main Library Plaza Restoration and Repair, Fort Lauderdale y Gardens Medical Pavilion, Palm Beach Gardens y City of Sunrise City Park y Victoria Nursing Home, Miami y FoundCare Medical Center, West Palm Beach y Broward County Main Jail Glazing, Fort Lauderdale y FAU Chiller Building, Boca Raton y City of Lauderhill Wolk Park y Memorial Regional Hospital South Main Tower Hardening, Hollywood y Broward Health USP 800 Pharmacies Various Locations, Broward County y City of Lauderhill Maye Jenkins Boxing Training Building y Seminole Tribe of Florida Immokalee Complex (Medical Clinic, Behavior Clinic, EOC, Police and Fire Station) y Broward County Nancy J. Cotterman Center, Fort Lauderdale y Miami-Dade County Empowerment Center, Miami y Broward County Transit Center, Lauderhill y City of Weston Fire Station 21 y City of Margate Fire Station 58 y City of Pompano Beach Fire Station 114 y City of Fort Lauderdale Temporary Fire Station13 Relocation y Lawton Chiles Middle School, Miami y Broward County - Miscellaneous Projects Under a Continuing Contract y Miami Dade College North Campus Building 1000, Miami y Tradewinds Park North, Coconut Creek y Shenandoah Middle School, Miami y Meadowlane Elementary School, Hialeah y Delray South, Delray Beach y Mall of the Americas, Miami B. Staff Availability Tradewinds Park North Broward County Main Jail Glazing City of Margate Fire Station No. 58 City of Sunrise Athletic Center Workload & Staff Availability Staff Member Availability % Charles A. Michelson, PIC 30% Sheff L. Devier, AIA, Sr. PM 40% Norman Schwartz, AIA, PM 40% Maday Gutierrez, RA, PM 40% Frida Dunayer, Interiors PM 40% Technical Staff 50% Administrative Staff 30% The current and projected WORKLOAD of each team member is such that this contract will receive top priority – and will not have an impact on projects under this contract. Strong project management will be the key in our TEAM’s ability to successfully execute your projects in a timely fashion. Current and projected projects are as follows: PROJECT APPROACH AND UNDERSTANDING D. PROJECT APPROACH AND UNDERSTANDINGD. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 9 A. Services Firm is Proposing In order to best meet the criteria specified in the Scope of Services for the City of Sunny Isles' proposed projects under this contract, Saltz Michelson Architects offers the following, available through our in-house staff and team of consultants: Analysis of projected building and land space requirements, including examination and inventories of existing building usability, if required Site selection and development including alternative site determination and evaluation Analysis of the impact of development on the surrounding community in terms of traffic generation, community services, and local ecology Land use, concurrency, platting and zoning analysis Financial feasibility studies including budget determination, project requirements and construction costs Master development planning and conceptual design studies Tenant coordination and plan review Space programming Architectural design Design development and production of construction documents and specifications as required for building construction Structural engineering Mechanical and electrical engineering Civil engineering & survey Landscape architecture Interior design Construction administration Construction consulting Design and signage criteria manuals LEED AP Services Cost Estimating Expert Witness Services Bridge Consulting Construction Engineering Inspection (CEI) Market Analysis B. Project Management Plan Saltz Michelson Architects will be the prime firm leading this effort, with all SMA staff reporting to Charles Michelson, the Principal-in-Charge. Our consultant team will report to the Project Manager, several of which are available to serve the City of Sunny Isles Beach and are shown on the Organizational Chart. The Project Manager will be the Team Leader and single point of contact who will: »Lead the creative process »Establish the program »Communicate effectively the scope of work »Review compliance with the budget »Liaison to the City of Sunny Isles Beach »Adhere to SMA office policies Our approach will ensure that your project objectives are met through the following management activities: »Coordination and communication »Sufficient resources and staff »Cost control »Schedule control »Quality control It has been our firm’s experience that close client and consultant relationships lead to a successful project. We place major emphasis on routine and timely communication with the City of Sunny Isles Beach as well as all consultants and agencies involved in the project. We will also establish regular review meetings to be documented by memoranda listing decisions made, actions to be taken, assignments of responsibility for those actions, and pending items. The documentation we generate will be sent to the City on a regular basis. C. Interpretation of the Scope Since our inception in 1976, Saltz Michelson Architects has accumulated an extensive list of open-ended contracts with numerous government and other public agencies — as such, we feel that our services would be beneficial to PROJECT APPROACH AND UNDERSTANDINGD. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 10 the City of Sunny Isles Beach. We understand the unique needs of these different and diverse types of projects and have the experience to respond. From planned capital improvements, modernization projects, to reroofs, ADA upgrades, problem solving, leak solving problems, etc. to remediation and repair after storms, you need a firm with the capability to respond. We are familiar and experienced in designing facilities that meet and exceed FEMA standards and the Florida Building Code. Our work includes many essential service facilities – from the new City of Weston EOC, multiple fire stations, government buildings such as the recently completed Broward Addiction Recovery Center (BARC), to our extensive hospital work including a data center for Memorial Healthcare System's five hospitals. D. Method of Approach 1. Overall Project Approach Our Team’s overall approach, rooted heavily in collaboration and interaction, recognizes that we must bring technical and economical points of view to the planning and design process. Our goal is to achieve cost savings and maintain levels of service and institutional integrity by optimizing the relationships among people, processes, and place. Our time-tested approach adds value through: Objectivity – a system of asking the right questions, listening, and documenting your answers »Review, refine, and test facility improvement ideas and present new ideas and options for consideration without preconceived solutions Collaboration – building consensus through the involvement of key stakeholders »Separate wants from needs objectively, and achieve consensus and buy-in for the agreed upon course of action »Identify all cost elements and drivers as well as cost avoidance opportunities through integrated cost modeling from the outset of activities Analysis – a macro-level process that breaks the problem into its parts »Ensure that the City of Sunny Isles Beach gets the best solution for the right price Given an unlimited budget and timetable, it's easy to generate a spectacular solution - but it is a challenge and opportunity to create a successful solution from a cost-sensitive point of view. Working with all project stakeholders to achieve more from less is where the creativity and talent of our team and approach will distinguish itself. 2. Specific Project Approach A. Programming Programming will be the first phase in the design of your projects. It is the architect’s first task and often the most important. The process is a simple and comprehensive organized method of inquiry and interaction. With the information gathered, we will develop elementary drawings and relationship diagrams indicating design considerations in relation to circulation and utilities, single line design plans, and cost and area analysis in relationship to program and budget. COMMUNITY CHARRETTE TO “REIMAGINE THE RIVERWALK CENTER” FAU SCHOOL OF ARCHITECTURE - FORT LAUDERDALE Process People PROJECT Place PROJECT APPROACH AND UNDERSTANDINGD. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 11 B. Schematic Design Upon approval of the Programming Phase, we will proceed into the Schematic Design Phase. The goal of this phase will be to create a safe, secure, functional, and aesthetic design that meets the project objectives. Compromises among program requirements, budget and quality, appearance, security, and energy efficiency, along with many other decisions, will be made based upon input from the City. The Schematic Design submittal will include more detailed plans and a review of program requirements, together with a cost analysis and its relationship to the established budget and program. C. Design Development During the Design Development Phase, all of the issues left unresolved at the end of Schematic Design will be flushed out and all engineering systems established. The design itself will achieve the refinement and coordination necessary for a truly polished structure. Without this phase, too many important areas of design exploration are compressed into the Schematic Design Phase or left to construction drawings. The Design Development Phase will include detailed drawings of the building plans and will detail equipment locations, area calculations, finishes, fire code requirements, and building materials. Engineering (MEP) drawings and calculations will be provided in sufficient detail to identify systems and equipment modifications and the participation of specialty engineering items, if required by the program. D. Final Construction Documents The Contract Documents Phase will bring to completion all drawings and specifications necessary for construction. All drawings will be checked for completeness and coordination among disciplines. Final engineering calculations will be submitted, and specifications will be finalized with attention to standard materials and methods of construction. This phase will include: • Project management • Coordination with City of Sunny Isles Beach • Consultant coordination • Periodic project meetings with all parties • Review all documents for design Intent • Monitor the reviews with all applicable agencies E. Bid/Negotiation Phase During this phase, if the design/bid/build method is selected, we will generate all of the necessary bid documents based upon the City’s legal requirements as part of our Technical Specifications book. We will then assist the City in the distribution of the Contract Documents to contractors interested in bidding the project. We will issue clarification and additional information addenda to the bidders, as necessary, to ensure the most competitive bidding climate. Upon receipt of the bids, we will review the submitted documents for conformance to the bid requirements and assist the City in ranking the bidders and the ultimate award of the contract. F. Construction Administration Saltz Michelson Architects will provide staffing for the Construction Administration Phase which will include monitoring quality compliance, observing construction/ installation status, reviewing submittals, and completing other customary construction phase services as Owner’s Representatives. Monitoring and coordination will begin when the construction contract is awarded and will continue throughout the life of the project. Personnel will be assigned to the project to the degree of expertise necessary to monitor the construction progress and assist in administrative activities. Professional and administrative support office personnel will also be assigned. The total CA Phase will be directed by the Project Manager. This phase will include: • Project management • Consultant coordination PROJECT APPROACH AND UNDERSTANDINGD. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 12 • General administration of the construction contract (pre-construction conference, architectural construction administration, and periodic site visits and job site meetings) • Shop drawing review • Response to Requests for Information (RFIs) • Review of samples & materials • Material substitutions • Material color selections – color schemes & sample boards • Review of mock-ups • Electronic correspondence logs for immediate access to the most updated information • Change order procedure • Verifying and approving periodic pay requests • Progress reports to owner • Minutes from owner/architect/contractor project meetings • Pre-final inspection (substantial completion punch list) • Punch list and final inspections • Final acceptance reports and procedures • Project close-out documents G. Participation with Governmental Agencies On behalf of the City, we will interact with all of the governmental agencies as necessary to obtain building permits and effectively execute any approval process necessary. We have completed a variety of public and private entity projects in the hurricane prone regions of South Florida. E. Innovative Concepts to Enhance Value, Quality, and Control Cost & Schedule Saltz Michelson Architects is committed to meeting all time and budget requirements specific to your contract - as well as providing you with highest quality design and service. 1. Maintaining Time Schedules Our careful planning and effective scheduling is based on our understanding the relationship of time, money, and resource utilization within the office and specifically for the scope of work. Creating an outline that defines the project in concise and controllable components will develop this understanding. Schedules will be developed for each of the project elements so that the actual performance can be compared to the outline schedule. Control of the overall project performance will be achieved by: 1. Monitoring every activity in progress 2. Immediate identification, evaluation, and implementation of corrective actions to restore the progress 3. Cost control by evaluating design alternatives and the extensive experience of our senior staff 2. Maintaining Cost Control/Value Engineering As no client has unlimited resources, we consider maintaining cost control and designing to the budget to be among our most important functions. Alternative materials and methods of construction will be evaluated to ensure that the City of Sunny Isles Beach gets the most for its construction budget. Economics will be an ongoing consideration in the programming, design, and development phases. During the course of preparing design development, construction documents and specifications, and in conjunction with facility personnel, we will review materials and systems alternatives for purposes of value engineering. Long-term value versus higher up front costs will be identified and discussed. Probable cost statements may be prepared at each stage of the project to monitor the size and design of the facility against the budget. Our experience with similar projects will assist us in estimating preliminary budgets, as well as the use of industry publications such as R. S. Means, giving us the most current square foot project costs. 3. Quality Assurance/Quality Control Quality is an ongoing improvement process for us to surpass the City’s expectations. With an emphasis on definition, communication, coordination, cooperation, and consistency, we approach each project as a team intent on producing world-class architecture in the context of your goals. PROJECT APPROACH AND UNDERSTANDINGD. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 13 Our team’s approach will rely on quality as integral to the process. From inception, our management activities will apply throughout the scope, schedule, and budget of your projects. In the public driven sector, we work closely with our clients as well as hand-in-hand with our equipment planners, civil engineers, MEP engineers, structural engineers, landscape architects and City/code officials. The only success we have is when our client is successful. We have often entered into integrated project delivery where the stakeholders all have a share in the success of the project. We treat each other as partners, and this forms trust — something that is always our end goal. Quality Assurance (QA): Our planned and systematic approach to doing work providing confidence we will meet expectations. Quality Control (QC): We check work against a “control” standard to ensure that work is completed in accordance with the established criteria. 4. Green Design As members of the US Green Building Council, and with four LEED Accredited Professionals on staff, Saltz Michelson Architects advocates that sustainable design is sensible design, and green design will achieve the following: • Bring efficiencies to mechanical operation and human performance • Create opportunities for interaction with the natural environment • Respond to the natural contextual effects of climate, orientation and other influences • Use resources efficiently • Maximize the use of local materials • Minimize demolition and construction wastes • Use products that minimize waste in their production or disposal • Use energy and resources as efficiently as possible • Create projects with healthy indoor environments Energy conservation and sustainability are critical elements of every design we produce. It has always been our philosophy to provide design solutions that improve the comfort and health of the occupants within the built environment while sustaining and enhancing our natural environment. At the early stages of every project, our design team meets with the owner to develop a list of energy conservation measures to be evaluated. Each measure is input into the building energy model, and life cycle cost or simple energy payback calculations are prepared as required for the Owner to make an informed decision as to their inclusion in the project. Throughout the design process, changes to the building envelope, floor plans, water conservation, and energy sources are continually updated in the energy model to check the impact on energy consumption and life cycle cost to the various energy measures included in the project. Our sustainable designs have proven to significantly reduce our clients’ operating and maintenance costs - freeing up considerable resources to help fund the critical activities for which these facilities were created. COMPLETED LEED CERTIFIED PROJECTS • Joe DiMaggio Children’s Hospital, LEED Gold • Broward Addiction Recovery Center, LEED Gold • Quantum Marine Headquarters, LEED-Certified • Citibank London Square, Kendall, FL, LEED-CI • Citibank Brickell Avenue, Miami, FL, LEED-CI • Sports Authority, Hollywood, FL, LEED-CI ANTICIPATED FUTURE LEED CERTIFICATIONS y Miami-Dade County Empowerment Center (Silver) y City of Hollywood Fire Station 45 (Gold) y Nancy J. Cotterman Center (Gold) PROJECT APPROACH AND UNDERSTANDINGD. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 14 5. Building Information Remodeling To provide increased value to our clients, our team uses Building Information Modeling (BIM) technol- ogy to establish a collaborative platform for the entire project team to communicate through Revit. This tool allows us to create a single, easily shared 3D product model of building components that includes all of a project’s design information. Changes made to one element of the model are reflected in all views. Through the use of BIM, our team will deliver the highest quality project during all phases of the project life-cycle. The majority of the BIM industry now includes Virtual Design & Construction applications that provide a 4D perspective and a better collective understanding of design intent and construction execution. Complex design can become a reality when compared to con- nection construction processes of the past. Broward County Addiction Recovery Center (BARC) This 51,419 square foot, two-story addiction treatment facility adhered to all of the requirements of its contract with Broward County including visualization, scheduling, clash detection, interference management, and COBie software. This was the first project for Broward County completed using BIM. 3D Model | Virtual Reality Drawings Actual Photos Broward County Transit Center This new transit center will serve over 8,000 transit passengers daily. To the right are current examples of 3D Modeling and Virtual Design Reality. This project will be the first totally NET-ZERO facility in Broward County. QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL E. QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 16 Continuing Professional Consulting Services (CCNA), Sunny Isles Beach, Florida July 8, 2020 Charles A. Michelson, AIA, ACHA, LEED AP, President Saltz Michelson Architects, Inc. (954) 266-2700 (954) 266-2701 SMA@SaltzMichelson.com 20-07-01 AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016) ARCHITECT - ENGINEER QUALIFICATIONS PART I - CONTRACT-SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1. TITLE AND LOCATION (City and State) 2. PUBLIC NOTICE DATE 3. SOLICITATION OR PROJECT NUMBER B. ARCHITECT-ENGINEER POINT OF CONTACT 4. NAME AND TITLE 5. NAME OF FIRM 6. TELEPHONE NUMBER 7. FAX NUMBER 8. E-MAIL ADDRESS C. PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors.) (Check) 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT PRIME J-V PARTNER SUBCON-TRACTOR a. CHECK IF BRANCH OFFICE b. CHECK IF BRANCH OFFICE c. CHECK IF BRANCH OFFICE d. CHECK IF BRANCH OFFICE e. CHECK IF BRANCH OFFICE f. CHECK IF BRANCH OFFICE D. ORGANIZATIONAL CHART OF PROPOSED TEAM (Attached) Saltz Michelson Architects, Inc. Holland Engineering, Inc. Kamm Consulting, Inc. Miller Legg & Associates, Inc. Federal Engineering & Testing, Inc. Reliance Engineering, Inc. 3501 Griffin Road Fort Lauderdale, FL 33312 1120 SE 3rd Avenue Fort Lauderdale, FL 33316 1407 West Newport Center Drive Deerfield Beach, FL 33442 5747 North Andrews Way Fort Lauderdale, FL 33309 3370 NE 5th Avenue Oakland Park, FL 33334 10388 West State Road 84, #112 Davie, FL 33324 Architectural Planning & Design Civil Engineering MEP/FP Engineering Survey, Landscape Architecture, Environmental Geotechnical Engineering Structural Engineering QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 17 Continuing Professional Consulting Services (CCNA), Sunny Isles Beach, Florida July 8, 2020 Charles A. Michelson, AIA, ACHA, LEED AP, President Saltz Michelson Architects, Inc. (954) 266-2700 (954) 266-2701 SMA@SaltzMichelson.com 20-07-01 AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016) ARCHITECT - ENGINEER QUALIFICATIONS PART I - CONTRACT-SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1. TITLE AND LOCATION (City and State) 2. PUBLIC NOTICE DATE 3. SOLICITATION OR PROJECT NUMBER B. ARCHITECT-ENGINEER POINT OF CONTACT 4. NAME AND TITLE 5. NAME OF FIRM 6. TELEPHONE NUMBER 7. FAX NUMBER 8. E-MAIL ADDRESS C. PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors.) (Check) 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT PRIME J-V PARTNER SUBCON-TRACTOR a. CHECK IF BRANCH OFFICE b. CHECK IF BRANCH OFFICE c. CHECK IF BRANCH OFFICE d. CHECK IF BRANCH OFFICE e. CHECK IF BRANCH OFFICE f. CHECK IF BRANCH OFFICE D. ORGANIZATIONAL CHART OF PROPOSED TEAM (Attached) Saltz Michelson Architects, Inc.3501 Griffin Road Fort Lauderdale, FL 33312 Architectural Planning & Design Dave Bodker Landscape Architecture/Planning, Inc.601 N Congress Ave # 105A Delray Beach, FL 33445 Landscape Architecture QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 18 Organizational Chart of Proposed Team Architectural Planning & Design Charles A. Michelson AIA, ACHA, LEED AP President Role: Principal-in-Charge Norman Schwartz AIA, LEED GA Project Manager Role: Project Manager Frida Dunayer Project Manager Role: Interiors Project Manager Sheff L. Devier AIA Senior Project Manager | Shareholder Role: Sr. Project Manager & QA/QC Maday Gutierrez RA Project Manager Role: Project Manager Juan Pablo Garcia BIM Manager Role: BIM Manager Staffing Plan Saltz Michelson Architects, Inc. (SMA) will be the prime professional. All SMA staff will report to Charles Michelson, Principal-in-Charge. Sheff Devier will be the Senior Project Manager and provide project oversight and quality control. Norman Schwartz, Maday Gutierrez, and Frida Dunayer will oversee the projects and will be the Project Managers/Team Leaders and single points of contact who will: y Lead the creative process y Establish the program y Manage the Consultant Team y Communicate effectively the scope of work y Review compliance with the budget y Liaison to the City of Sunny Isles Beach y Adhere to SMA office policies Subconsultants Holland Engineering, Inc. Civil Engineering Reliance Engineering, Inc. Structural Engineering Kamm Consulting Engineers, Inc. MEP Engineering Federal Engineering & Testing, Inc. Geotechnical Engineering Miller Legg & Associates, Inc. Survey /Landscape Arch./Environmental Dave Bodker Landscape Architecture/ Planning, Inc. Landscape Architecture QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 19 12. NAME 13. ROLE IN THIS CONTRACT 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE b. WITH CURRENT FIRMa. TOTAL 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) 15. FIRM NAME AND LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 2 a. b. c. d. (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) e. Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Charles A. Michelson AIA, ACHA, LEED AP Principal-In-Charge 40 40 Saltz Michelson Architects, Inc. Fort Lauderdale, Florida Bachelor of Architecture, 1979, University of Miami Master of Urban and Regional Planning, 1981, University of Miami 1993-1997/ 2001-2004/ 2006- 2009/ 2011-2016/ 2016-2020 1993-1997/ 2001-2004/ 2006- 2009/ 2011-2016/ 2016-2020 Broward County (Continuing Contract) Various Locations, Florida Under the firm’s continuing contract with the County (recently renewed for the fifth time), SMA has been involved with multiple projects with varying scopes, sizes and costs. Projects within the past five years include design criteria for the convention center, fourth floor reno- vation at Government Center West, first floor renovation at Government Center East, bus charging infrastructure, Judicial complex, and Judges bench. Cost: Various under $2,000,000. Role: Principal-in-Charge. Florida Department of Management Services (Continuing Contract) Boynton Beach & Lantana, Florida WXEL-TV/PBS Reglazing & Roof Replacement, Boynton Beach, FL: Complete roof replacement, curtain wall (building envelope) replacement and emergency back- up A/C system for control rooms support. New glazing storefront and window systems along select areas of the east, north and west sides of the building were removed and reinstalled. Cost: $1,500,000. Role: Principal-in-Charge. Lantana Motorist Services Facility, Lantana, FL: Renovation of a 6,700 SF office building for the Florida Highway Safety and Motor Vehicles Department. Project includes new office and training room layout, ADA compliant bathrooms and transaction counter, new finishes throughout, new A/C unit and duct work throughout, new roof system and new exterior windows and doors. Cost: $650,000. Role: Principal-In-Charge. Broward College (Continuing Contract) Broward County, Florida Successful completion of multiple college remodeling projects under the firm’s continuing contract with Broward College (recently re-awarded) on all four of their campuses. Projects have included the Will & Jo Holcombe Institute for Higher Learning, Building 8 Dental Lab, Nursing Lab, and Clinical Practice, and the Maroone Automotive Training Facility. Scopes of work have included remodeling, renovations, architectural survey work, budget preparation, and reroofing projects. Cost: Various. Role: Principal-in-Charge. 1995-PresentMemorial Healthcare System (Continuing Contract) Broward County, Florida Our open ended contract with Memorial Healthcare System (25 consecutive years) has included projects within Memorial Regional Hospital, Memorial Regional Hospital South, Memorial Hospital Pembroke, Memorial Hospital Miramar, Memorial Hospital Office Centre, Memorial Hospital West Office Building and other medical facilities in buildings throughout South Broward County. Cost: Various ($50,000 - $28,000,000). Role: Principal-in-Charge. Registered Architect Florida, #9976 Registered Architect Georgia, #00874 Professional Accreditation: Leadership in Energy and Environmental Design (LEED AP); American College of Healthcare Architects (ACHA). Professional Affiliations: American Institute of Architects (AIA), U.S. Green Building Council (USGBC), South Florida Hospital & Healthcare Association (SFHHA); Certificate of Completion: ASHE Healthcare Construction Certificate, 2004; Public Service: Facilities Task Force for the Broward County School Board, 1992-1999, Chairman 1994 -1995, 1998, Smart Schools Task Force, Department of Management Services 1999-present, Construction & Design Subcommittee of the Broward Educational Planning Initiative, 1996. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) X X X X 10. RELEVANT PROJECTS City of Weston (Continuing Contract)Weston, Florida Under our continuing contract with the City, renovation of 15 park restroom buildings located at various parks throughout the city. The scope of the work includes complete internal demo and reinstallation of new fixtures, partitions, floor and wall tile surfaces, and restroom accessories. Cost: $1,700,000. Role: Principal-In-Charge. X 20162016 2015/2018 1995-2010/2012-Present 2015/2018 1995-2010/2012-Present 1995-Present QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 20 12. NAME 13. ROLE IN THIS CONTRACT 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE b. WITH CURRENT FIRMa. TOTAL 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) 15. FIRM NAME AND LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 2 a. b. c. d. (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) e. Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Sheff L. Devier AIA Senior Project Manager & QA/QC 45 19 Saltz Michelson Architects, Inc. Fort Lauderdale, Florida Virginia Polytechnic Institute & State University, Bachelor of Architecture, 1975 20152015Broward County Main Library Wind Mitigation & Hurricane Hardening Fort Lauderdale, Florida Wind mitigation and renovation of The Broward County Main Library Building and covered pedestrian bridge to current Florida Building Code and FM Global Standards. The work was staged for uninterrupted and continued use of the facility and egress. Cost: $11,000,000. Role: Project Manager X 20082008Boulevard Heights Community Center & Hollywood West Sports Park Hollywood, Florida After a public referendum to issue a General Obligation Bond was passed by the City of Hollywood, Florida voters in 2004, along with a $100,000 grant from Broward County, the City engaged Saltz Michelson Architects to master plan the 12.24 acre site, create a new Community Center, and redevelop the Sports Park. Cost: $6,300,000. Role: Project Manager. X OngoingOngoingMiami Dade College, North Campus Bldg. 1000 Deferred Maintenance Project(Continuing Contract) Miami, Florida Upgrades to Building 1000 to address existing deficiencies such as building envelope refurbishment, exterior paint, and miscellaneous mechanical and electrical upgrades. Cost: $1,822,500. Role: Project Manager. X X Registered Architect Florida, #007699 Professional Affiliations: American Institute of Architects (AIA) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 10. RELEVANT PROJECTS 1993-1997/ 2001-2004/ 2006- 2009/ 2011-2016/ 2016-2020 1993-1997/ 2001-2004/ 2006- 2009/ 2011-2016/ 2016-2020 Broward County (Continuing Contract) Broward County, Florida Under the firm’s continuing contract with the County (27 years), SMA has been involved with multiple projects with varying scopes, sizes and costs. Projects within the past five years include design criteria for the convention center, Booher building expansion and renovation, Government Center West fourth floor renovation, Government Center East first floor renovation, bus charging infrastructure, Judicial complex, and Judges bench. Cost: Various under $2,000,000. Role: Project Manager. X 20152015City of Weston Emergency Operations Center Weston, Florida An approximately 25,000 SF, three-story Emergency Operations / Code Services / Information Technologies Services Building. The offices for Building Code, Zoning Code, Fire Code, Code Enforcement and Records Storage are on the first floor. Located on the second floor are the City’s Emergency Operations Center, kitchen facilities, IT Offices, and multi-purpose space. The third floor is for staff sleeping quarters and support spaces. Cost: $7,400,000. Role: Project Manager. QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 21 12. NAME 13. ROLE IN THIS CONTRACT 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE b. WITH CURRENT FIRMa. TOTAL 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) 15. FIRM NAME AND LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 2 a. b. c. d. (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) e. Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Norman I. Schwartz AIA, LEED GA Project Manager 29 7 Saltz Michelson Architects, Inc. Fort Lauderdale, Florida Bachelor Science in Architecture, Florida A and M University, 1989 Master of Architecture, Virginia Polytechnic Institute and State University, 1991 20192019City of Hollywood Fire Station No. 45 Lauderhill, Florida New replacement fire station (7,088 SF) with sleeping bunk rooms, kitchen/dining room, day room, exercise room, office and watch room. In addition, the station has two large apparatus bays with support spaces of bunker gear, storage, medical and other building support areas. New building and site designed and built to “LEED Silver Standards” for sustainability. Cost: $3,145,000. Role: Project Manager. X N/A2019City of Lauderhill West Ken Lark Park (Continuing Contract) Lauderhill, Florida Design drawings for a design build project to provide improvements to West Ken Lark Park. Scope includes building and concessions renovation and storage addition, playground and sign, pavilion, benches and bleachers, additional parking and walking path. Cost: N/A. Role: Project Manager. X Registered Architect Florida, #AR0015360 Design Competition: American Fallen Warriors Memorial, Kansas City, KS- Selected. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 10. RELEVANT PROJECTS X 20152015FL Dept. Management Services WXEL-TV/PBS Reglazing & Roof Replacement (Continuing Contract) Boynton Beach, Florida Under the firm's continuous contract with the Florida Department of Management Services, complete roof replacement, curtain wall (building envelope) replacement and emergency back-up A/C system for control rooms support. New glazing storefront and window systems along select areas of the east, north and west sides of the building were removed and reinstalled. The work was coordinated and completed in phases so the facility could remain in operation during construction. Cost: $1,500,000. Role: Project Manager. Ongoing2019City of Sunrise - Sunrise Athletic Complex Sunrise, Florida Addition and renovation of a 1,156,848 square foot park. The complex will have a new athletic building, new playground, and new plaza for food vendors or food markets. In addition, three new multi-sport fields will be added along with a concession stand and sports commentator tower. Est. Cost: $11,700,000. Role: Project Manager. X 20172017 XX Shenandoah Middle School Renovations (Continuing Contract) Miami-Dade County, Florida Under the firm’s continuing contract with MDCPS (renovations to 11 schools), SMA investigated the historical relevance of the school and worked with the community to preserve it. Renovations included replacement/modification of HVAC, electrical, plumbing, ADA compliance, roofing upgrade, site drainage, misc. finishes, new replacement store front window system for all classrooms, PA system replacement, railings and light fixture replacements, and repainting of the entire campus. Role: Project Manager. Cost: $5,172,144. QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 22 12. NAME 13. ROLE IN THIS CONTRACT 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE b. WITH CURRENT FIRMa. TOTAL 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) 15. FIRM NAME AND LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 2 a. b. c. d. (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) e. Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Maday Gutierrez RA Project Manager 21 6 Saltz Michelson Architects, Inc. Fort Lauderdale, Florida Bachelor of Architecture, 1999, University of Miami Ongoing2020Sunrise City Park Renovations Sunrise, Florida Renovation of an approximately 50,000 SF of City Park’s playing fields, walking paths, restrooms, playground equipment, renovate and expand the existing parking area. Addition of two new basketball courts and new covered theatrical stage shelter. Cost: $4,600,000. Role: Project Manager. Ongoing2020Miami-Dade County Empowerment Center Miami-Dade County, Florida A 28,000 SF empowerment center and multipurpose facility that accommodates 60 emergency shelter beds with the flexibility to expand in the future. The goal is to create a welcoming, safe and accessible shelter environment that supports the survivors and their children by meeting their needs for self-reliance, security, and dignity. Design strategies ensured limited visibility and controlled access. Estimated Cost: $12,350,000. Role: Project Architect. X X 2016-Present2016-Present X Miami-Dade County Public Schools (Continuing Contract) Miami-Dade County, Florida Renovation projects for three schools (Avocado Elementary School, Winston Park K-8 Center, and Village Green Elementary School), including field verification, scope validation, design development, and construction administration. The work included new mechanical, plumbing, and electrical infrastructure and architectural renovations to entry canopies, playgrounds, and window/storefront replace - ments. Cost: Various. Role: Project Architect. X Ongoing2020Broward County Transit Electric Bus Charging Infrastructure (Continuing Contract) Dania Beach, Florida Under the firm's continuing contract with Broward County, a new electric bus charging infrastructure within the existing Transit Ravenswood Road and Copans Road Maintenance Facilities . The infrastructure will include, new parking spaces to accommodate 40’ and 45’ electric buses, a new canopy system and the charging and associated electrical equipment. Cost: $1,740,000. Role: Project Manager. Registered Architect Florida, #AR95167 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 10. RELEVANT PROJECTS City of Weston (Continuing Contract) Weston, Florida Under our continuing contract with the City, renovation of 15 park restroom buildings located at various parks throughout the city. The scope of the work includes complete internal demo and reinstallation of new fixtures, partitions, floor and wall tile surfaces, and restroom accessories. Cost: $1,700,000. Role: Principal-In-Charge. X 20162016 QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 23 12. NAME 13. ROLE IN THIS CONTRACT 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE b. WITH CURRENT FIRMa. TOTAL 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) 15. FIRM NAME AND LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 2 a. b. c. d. (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) e. Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Frida Dunayer Interiors Project Manager 37 20 Saltz Michelson Architects, Inc. Fort Lauderdale, Florida Ricardo Palma University, Lima, Peru M. Arch and Urbanism, 1983 N/A2020Lauderhill Police Department Building Expansion (Continuing Contract) Lauderhill, Florida Design criteria documents for a new single-story building, approximately 5,000 SF including gun range, scenario rooms, dining room, computer room, classroom, and miscellaneous support functions . Site improvements include modifications to the exiting parking lot. Estimated Cost: $1,800,000. Role: Project Manager. N/A2019Wolk Park Design Criteria (Continuing Contract) Lauderhill, Florida Design criteria package for a design/build park improvements project. The proposed project elements include a new building, rehab tennis courts and pool, new fencing, new pavilion, and children's splash pad. Cost: N/A. Role: Project Manager. Registered Architect Lima, Peru C.A.P. #2273 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) X X X X 10. RELEVANT PROJECTS 1993-1997/ 2001-2004/ 2006- 2009/ 2011-2016/ 2016-2020 1993-1997/ 2001-2004/ 2006- 2009/ 2011-2016/ 2016-2020 Broward County (Continuing Contract) Various Locations, Florida Under the firm’s continuing contract with Broward County for over 25 years (recently renewed for the fifth time), SMA has been involved with multiple projects with varying scopes, sizes and costs. Some of these projects included the Property Appraiser’s Office Renovation, Main Library Learning Lab, North Board of Health Parking Lot expansion, a Transit Support Building, offices for the IT Department, and various Reports and Studies, among many others. Cost: Various under $2,000,000. Role: Project Manager. X Ongoing2020Miami-Dade County Empowerment Center Miami-Dade County, Florida A 28,000 SF empowerment center and multipurpose facility that accommodates 60 emergency shelter beds with the flex- ibility to expand in the future. The goal is to create a welcoming, safe and accessible shelter environment that supports the survivors and their children by meeting their needs for self-reliance, security, and dignity. Design strategies ensured limited visibility and controlled access. Estimated Cost: $12,350,000. Role: Interiors Project Manager. 1995-PresentMemorial Healthcare System (Continuing Contract) Broward County, Florida Our open ended contract with Memorial Healthcare System (25 consecutive years) has included projects within Memorial Regional Hospital, Memorial Regional Hospital South, Memorial Hospital Pembroke, Memorial Hospital Miramar, Memorial Hospital Office Centre, Memorial Hospital West Office Building and other medical facilities in buildings throughout South Broward County. Cost: Various ($50,000 - $28,000,000). Role: Projrect Manager. 1995-Present QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 24 12. NAME 13. ROLE IN THIS CONTRACT 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE b. WITH CURRENT FIRMa. TOTAL 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) 15. FIRM NAME AND LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 2 a. b. c. d. (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) e. Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Juan Pablo Garcia BIM Manager 25 5 Saltz Michelson Architects, Inc. Fort Lauderdale, Florida Universidad Central de Venezuela B.S. Architecture, 1999 20182018Broward County Addiction Recovery Center (BARC) Fort Lauderdale, Florida A new two-story, 51,419 SF building housing a fifty bed detoxification unit, outpatient counseling services, medical exam spaces and other related operational and business functions. Scope included full architectural schematics through Construction Administration & Warranty. Cost: $18,900,000. Role: BIM Manager. Ongoing2020Skilled Nursing Facility Doral, Florida A 135,000 SF skilled nursing facility and 299-space parking structure. Construction drawings shall include but are not limited to architectural, structural, mechanical, plumbing, fire sprinkler, basic technology, security, nurse call system, medical gas engineering drawings and electrical plans required for permit. Estimated Cost: $31,000,000. Role: BIM Manager. Ongoing2020Lauderhill Mall Transit Center Lauderhill, Florida A new 3,000 SF transit center within the Lauderhill Mall to serve over 8,000 daily passengers. The new building includes 10+ bus bays, drivers’ lounge, breakroom with dedicated restrooms and locker areas, customer service area, separate public restrooms, security booth, and related mechanical and electrical equipment. Estimated Cost: $8,000,000. Role: BIM Manager. Registered Architect in Venezuela E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) X X X X 10. RELEVANT PROJECTS 2019 2019City of Hollywood Fire Station No. 45 Hollywood, Florida This new 7,224 SF facility and site were designed and built to “LEED Silver Standards” for sustainability. This facility contains 9 sleeping bunk rooms, a kitchen/dining room, day room, exercise room, office and watch room. In addition it has 2 large apparatus bays with support spaces of bunker gear, storage, medical and other building support areas. Cost: $3,145,000. Role: BIM Manager. X 20162016City of Weston Emergency Operations Center Weston, Florida A new 25,000 SF, three-story Emergency Operations/Code Services/IT Services Building. The offices for Building Code, Zoning Code, Fire Code, Code Enforcement and Records Storage are on the first floor. Located on the second floor are the City’s EOC, kitchen facilities, IT Offices, and multipurpose space. The third floor is for the Emergency Operations staff sleeping quarters and support spaces. Cost: $7,400,000. Role: BIM Manager. QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 25 12. NAME 13. ROLE IN THIS CONTRACT 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE b. WITH CURRENT FIRMa. TOTAL 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) 15. FIRM NAME AND LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 2 a. b. c. d. (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) e. Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Susan Holland PE, LEED AP Civil Engineer / Principal-In-Charge 38 24 Holland Engineering, Inc. Fort Lauderdale, Florida Master Public Administration, FAU 1994 Bachelors Science Engineering, UF 1981 Ongoing2019City of Sunrise - Sunrise Athletic Complex Sunrise, Florida Renovation of a park for the City of Sunrise for football /soccer, including an athletic center, concession building, parking, water & sewer and drainage improvements. Est. Cost: $11,700,000. Role: Civil Engineer. 20182017Margate Sports Complex Margate, Florida Design and construction of a new athletic field, including restroom and concession buildings. Services included the design of a drainage system, water, and sewer, site development. Approximate cost $1.2 million. Civil Engineer 20172016City of Hallandale Beach Foster Park Plaza Hallandale Beach, Florida Project for the City of Hallandale That included development of a community park, water, sewer and drainage improvements. Approximate Cost: $800,000. Role: Civil Engineer. Registered Professional Engineer, Florida LEED Accredited Professional Certified General Contractor, Florida Stormwater Management Inspector. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 2 0112 011 Pembroke Shores YMCA Expansion & Modernization Pembroke Pines, Florida A 17,000 square foot addition and phased redevelopment of the existing Pembroke Shores Gymnasium Facility and construction of a 200 vehicle parking lot. Remodeling work was also completed in portions of the existing facility. The existing facility was 100% operational during construction. Cost: $4,200,000. Role: Interiors Civil Engineer. X X X X X 10. RELEVANT PROJECTS 20192018Pioneer Middle School Cooper City, Florida Design of a new fire main and drainage improvements for a Broward County school. Approximate Cost: $500,000. Role: Civil Engineer. QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 26 12. NAME 13. ROLE IN THIS CONTRACT 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE b. WITH CURRENT FIRMa. TOTAL 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) 15. FIRM NAME AND LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 2 a. b. c. d. (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) e. Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Ayitey Aryee PE Civil Engineer 9 5 Holland Engineering, Inc. Fort Lauderdale, Florida B.S./Mechanical Engineering/New York Institute of Technology 20182015Atlantis Bay Harbor Islands, Florida Renovation of a park for the City of Sunrise for football /soccer, including an athletic center, concession building, parking, water & sewer and drainage improvements. Est. Cost: $11,700,000. Role: Civil Engineer. 20172015Jackson Street Apartments Hollywood, Florida Project consists of an apartment building. Project scope entails paving, stormwater drainage, parking areas, water, sewer and fire ser - vices. Approximate Cost: $5,900,000. Role: Civil Engineer. 20172015Braverman Eye Center Hollywood, Florida Civil engineering design for an eye care center. Services include design of a parking lot, water main, fire hydrants, stormwater drainage, and coordination services with permitting, architect, and landscape architect in a $2 million budget. Role: Civil Engineer. Registered Professional Engineer, Florida E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) Ongoing2019City of Sunrise - Sunrise Athletic Complex Sunrise, Florida Renovation of a park for the City of Sunrise for football /soccer, including an athletic center, concession building, parking, water & sewer and drainage improvements. Est. Cost: $11,700,000. Role: Civil Engineer. X X X X X 10. RELEVANT PROJECTS 20152014Edgewater Pointe Boca Raton, Florida Civil engineering design services for the re-paving of six parking areas for an assisted living facility. Services included plans for repair of asphalt and curbing, re-striping and new signage. Approximate Cost: $250,000. Role: Civil Engineer. QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 27 12. NAME 13. ROLE IN THIS CONTRACT 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE b. WITH CURRENT FIRMa. TOTAL 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) 15. FIRM NAME AND LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 2 a. b. c. d. (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) e. Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Michael Kroll RLA, FASLA Principal-In-Charge/Landscape Architect 34 32 Miller Legg & Associates, Inc. Fort Lauderdale, Florida Bachelor of Landscape Architecture / Graduate Studies / Urban and Regional Planning 20202020City of Miami Beach 20th Street & Sunset Drive Pocket Park Miami Beach, Florida Principal-In-Charge: Under our Continuing Contract with the City, Miller Legg was awarded an assignment to provide survey, civil, geotechnical, electrical, structural engineering and landscape architecture services for the design, permitting and construction of a new ADA-accessible .33-acre pocket park at 20th Street and Sunset Drive. The firm prepared a boundary and topographic survey, assisted with the planning of key program elements and performed schematic design, design development, construction document, bidding and construction tasks. The design incorporates Crime Prevention Through Environmental Design (CPTED) principles. Arborist and irrigation design services were also furnished for this project. N/A2018 City of Miami Beach Flamingo & Collins Historical Surveying Miami Beach, Florida Principal-In-Charge: Miller Legg was retained by the City of Miami Beach to conduct surveys in order to prepare FEMA elevation certificates for the Historic Buildings classification and Lifting Feasibility Guidelines Study of 444 structures in the Flamingo Park Historical District and 86 structures in the Collins Waterfront Historical District. This work was part of a project to evaluate the City's options for these structures (including elevation, remain in place, demolish, relocate, arden) in preparation for any future sea-level rise. GIS was used to efficiently collect and assemble project photos and data in the field. Miller Legg worked in tandem with our structural engineering subconsultant in its structural lifting analysis assignment for this project. TBD2020City of Miami Beach 19th Street Stormwater Pump Station Miami Beach, Florida Principal-In-Charge: Construction of this pump station was part of the overall plan for the City-wide stormwater improvement system to reduce flooding for residents of the Washington Avenue and Convention Center Drive neighborhood. Miller Legg provided topographic surveying services, a survey of utility designation markings, and an as-built survey of constructed improvements on the 19th Street pump station, the associated parking area and the re-capping areas of the seawall. Also, Miller Legg provided tree inventory and analysis, hardscape, landscape and irrigation design. FL / Registered Landscape Architect TX / Registered Landscape Architect Fellow American Society of Landscape Architects During his extensive career, Mr. Kroll, President of Miller Legg, has been actively involved in projects ranging from campus-wide educational facilities to international urban redevelopment projects. Mr. Kroll's diverse professional experience has led to projects that successfully integrate engineering, environmental, planning and landscape architectural services. Under his leadership, Miller Legg develops project solutions that respond to the natural environment, respect the social fabric and create sustainable aesthetic spaces. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 20132013Sunny Isles Beach Gwen Margolis Park & Pelican Community Park Artificial Turf Sunny Isles Beach, Florida Principal-In-Charge: The project consisted of the reconstruction of existing natural turf fields at Pelican Community Park and Senator Gwen Margolis Park in the City of Sunny Isles Beach with artificial turf. Miller Legg provided the preparation and permitting of drainage plans to collect under the new drain systems installed as part of the project, as well as surveying services. In addition, construction observation was provided to verify compliance with the plans and for the certification of the project through regulatory agencies. X X X X X 10. RELEVANT PROJECTS TBD2019City of Miami Museum Park Baywalk Phase 3 Miami, Florida Principal-In-Charge: Miller Legg is providing landscape architecture, civil engineering, lighting/electrical engineering, surveying, SUE, permitting and limited construction administration services for the Miami Baywalk Phase 3 Project. Permitting of the project improvements was provided through the City of Miami, Miami-Dade County and South Florida Water Management District. Funding for this project was acquired through the Florida Inland Navigational District (FIND) Grants Program. This project was performed under our Miscellaneous Landscape Architectural Services contract. QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 28 12. NAME 13. ROLE IN THIS CONTRACT 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE b. WITH CURRENT FIRMa. TOTAL 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) 15. FIRM NAME AND LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 2 a. b. c. d. (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) e. Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Martin Rossi PSM Senior Project Surveyor 41 35 Miller Legg & Associates, Inc. Fort Lauderdale, Florida TBDTBDCity of Miami Gardens Rolling Oaks Regional Park Miami Gardens, Florida Project Surveyor: Renovations of Rolling Oaks Regional Park include construction of a new one-story 4,000 SF recreation building, renovated restroom facilities, expansion of walking trail with lighting, distance marker, and exercise stations, new pavilions, new parking lot, refurbished basketball and tennis courts, new fencing, new shaded playgrounds, new landscaping and irrigation, addition of horseshoe pits, sand volleyball, mini golf and splashpad, and video system and WIFI. Miller Legg is providing civil engineering, landscape architecture and surveying services. N/A2019 Miami-Dade Parks, Recreation & Open Space (PROS) Devon Aire Park Shelter Miami, Florida Project Surveyor: Miller Legg was retained to provide survey/SUE, design, construction plans, permitting and construction administration for a new shelter and connecting walkways at Devon Aire Park in Miami. The shelter will be used by all age groups and is anticipated to be an extension of the existing playground area. ADA-accessible picnic tables are proposed. Site preparation and earthwork to reshape existing berms are also specified and detailed in the construction documents. Also included is the relocation of trees and the restoration of all areas, including walkways and lawns, which may be damaged during construction process. N/A2019 Miami-Dade Co. Parks, Recreation & Open Spaces (PROS) Matheson Hammock Park Mangrove Trail Survey Coral Gables, Florida Project Surveyor: The Miami-Dade Co. Parks, Recreation and Open Spaces Department embarked on a program of obtaining topographic surveys on a number of County Parks. Miller Legg assisted at Matheson Hammock Park in Coral Gables as part of a mangrove trail renovation project. The firm prepared a survey of the existing trail from Old Cutler Road to the Park east parking lot exit. The survey located and established a survey baseline along the center line, located above ground features at intervals, inner edges of mangrove roots, side gravel entrances and elevations at intervals. This deliverable was provided to meet a tight PROS Department deadline. FL / Registered Professional Surveyor & Mapper Mr. Rossi is a Senior Project Surveyor with more than four decades of surveying and subsurface utility engineering (SUE) experience. His principal areas of experience include surveys such as boundary, topographic, ALTA/ACSM land title surveys, quantity, environmental and wetland, condominium, construction layout, as-built, right-of-way, specific purpose and subdivisions and platting, as well as subsurface utility engineering (SUE). He currently manages the survey department and the survey field crews in South Florida. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 20132013Sunny Isles Beach Gwen Margolis Park & Pelican Community Park Artificial Turf Cooper City, Florida Senior Project Surveyor: This 526-acre parcel is one of the last large remaining tracts of vacant unincorporated land in southwest Broward County. The project involves the development of a residential community that includes apartments, townhomes, and single-family units. In addition, the development includes a Town Center that will provide limited commercial, restaurant and retail uses. X X X X X 10. RELEVANT PROJECTS N/A2019City of Miami West End Park Survey & SUE Miami, Florida Project Surveyor: Miller Legg provided boundary and topographic surveying services along with an underground utility survey of West End Park in Miami. The 7-acre active park offers playground, swimming pool, baseball, tennis, pavilion and picnic facilities in addition to a community center. QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 29 12. NAME 13. ROLE IN THIS CONTRACT 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE b. WITH CURRENT FIRMa. TOTAL 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) 15. FIRM NAME AND LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 2 a. b. c. d. (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) e. Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Karen Lynch PSM Project Surveyor 43 38 Miller Legg & Associates, Inc. Fort Lauderdale, Florida Associates Degree / Liberal Arts N/A2019City of Miami West End Park Survey & SUE Miami, Florida Project Surveyor Miller Legg provided boundary and topographic surveying services along with an underground utility survey of West End Park in Miami. The 7-acre active park offers playground, swimming pool, baseball, tennis, pavilion and picnic facilities in addition to a community center. N/A2019Miami-Dade Co. Traffic Intersections Topographic Surveys Miami, Florida Project Surveyor: Under the firm's Miami-Dade Co. Public Works continuing surveying services contract, Miller Legg provided topographic surveys of five (5) traffic intersections in various parts of the County. The scope entailed location and identification of utility structures, including invert and pipe information. In addition, mast arm, overhead wire data, horizontal and vertical control data were included and shown on the surveys. N/A2017 City of Miami Beach Collins Park Parking Garage 2018 Miami Beach, Florida Project Surveyor: Miller Legg provided property boundary and topographic surveying of the Collins Park Parking Garage, as well as topographic surveys of Liberty Avenue from 21st to 23rd Streets. The project will include 513 parking spaces, 15,000 square feet of ground floor retail, and a public plaza. Collins Park is at the southern end of South Beach, adjacent to the Bass Museum, Miami City Ballet and Miami-Dade Regional Public Library, a neighborhood considered the cultural destination of Miami Beach. FL / Registered Professional Surveyor & Mapper Ms. Lynch has extensive South Florida survey project management experience in a number of different public sector environments such as roadways and streetscapes, educational facilities, parks and recreation, and healthcare and medical office complexes. She also has wide-ranging experience in private sector surveying, including residential projects as well as commercial and industrial facilities. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) N/A2019Miami-Dade Co. Parks, Recreation & Open Spaces (PROS) Kendall Soccer Park Survey Cooper City, Florida Project Surveyor: Miller Legg was selected to provide topographic survey services to Miami-Dade County for the purposes of showing above-ground improvements and tree locations for an artificial turf replacement project on five (5) soccer fields. The survey was designed to show rim and invert elevations, pipe and drainage structure sizes. X X X X X 10. RELEVANT PROJECTS 20192019Miami Dade Water and Sewer Department (WASD) 48" Water Transmission Main Downtown Loop Closure Miami, Florida Project Surveyor: Miami-Dade Water and Sewer Department (WASD) had evaluated potential routes for two new water mains to improve water service in downtown Miami and enhance transmission interconnection capabilities between the North (Hialeah/Preston) and South (Alexander Orr) service area water systems. The resulting Miami Downtown Loop Closure Water Main Pipeline Design Build project focuses on the design and installation of 48" and 36" water transmission lines for combined Phases I and II. Phase 1 involves the construction of +/- 4,200 LF of 48" and +/- 300 LF of 30"DIP water transmission main; Phase II involves the construction of +/- 2300 LF of 36" DIP water transmission main. Miller Legg provided topographic survey, utility locates and engineering support services. QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 30 12. NAME 13. ROLE IN THIS CONTRACT 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE b. WITH CURRENT FIRMa. TOTAL 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) 15. FIRM NAME AND LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 2 a. b. c. d. (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) e. Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Dylan Larson SWPS, CEP, GTA Environmental Specialist 27 26 Miller Legg & Associates, Inc. Fort Lauderdale, Florida Bachelor of Science / Biology and Business Administration Master of Business Administration N/A2019Doral Glades Park Wetlands Monitoring Doral, Florida Project Surveyor Miller Legg provided boundary and topographic surveying services along with an underground utility survey of West End Park in Miami. The 7-acre active park offers playground, swimming pool, baseball, tennis, pavilion and picnic facilities in addition to a community center. N/A2014 City of Miami Beach South Beach Tree and Dune Inventory Miami Beach, Florida Environmental Specialist: Miller Legg and its Certified Arborists conducted a comprehensive tree and dune vegetation inventory on a section of South Beach east of the pedestrian walk from 3rd to 5th Streets. All 300 tree species found within the area were inventoried as point locations with associated attributes and all dominant shrub and ground cover species were collected as polygon data with associated percent coverage and species data. The information was then displayed on a digital map and the data was provided to the client in .shp file format. Miller Legg was a subconsultant to Coastal Systems International. 20182018 South Florida Water Management District (SFWMD) Taylor Slough/L-31W Levee Environmental Homestead, Florida Environmental Specialist: Miller Legg provided environmental consulting services for the South Florida Water Management District (SFWMD) Taylor Slough / L-31W Levee and Plugs project in Homestead. The SFWMD implemented an innovative plan which delivered needed fresh water to Florida Bay. The project was an immediate first step to help reduce salinity levels in the bay and promote the recovery of seagrasses killed during a severe drought in 2015. Permitting was coordinated with the US Army Corps of Engineers (USACOE) and Department of Environmental Protection (DEP). Senior Professional Wetland Scientist FL / Authorized Gopher Tortoise Agent Certified Environmental Professional PADI Certified Rescue Diver As Principal, Mr. Larson oversees operations and overall project management for the firm. He also has significant experience in environmental consulting in Florida and is responsible for directing studies and investigations on biological and ecological aspects of the firm’s projects. Specific environmental responsibilities include: field evaluations, assessments, recommendations and report writing, as well as wetland jurisdictional determination, dredge and fill permitting, wetland mitigation design, mitigation monitoring, recommendations for maintenance procedures, coordination and oversight of environmental GIS applications, and assistance with plan preparations and mitigation. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 20192019Doral Glades Park Boardwalk and Wetland Preserve Doral, Florida Environmental Specialist: Doral Glades Park is a 25-acre recreational facility for which passive and active elements were planned, including playing fields, community and nature pavilions, fishing pier, walking trail and wetland boardwalk. Miller Legg provided both design and permitting services as well as wetland and boardwalk construction administration services, using GIS and surface water management support. The scope included various environmental services. X X X X X 10. RELEVANT PROJECTS Est. 2022 Est. 2022City of Homestead Biscayne-Everglades Greenway Trail Homestead, Florida Environmental Specialist: Among the services Miller Legg is providing for this 3.2 mile, 12-foot-wide Biscayne Everglades Greenway shareduse trail project are landscape architectural, engineering, surveying and environmental service including preparation of FDOT-approved construction documents, design of regulatory and wayfinding signs, pavement markings, safe pedestrian push button crossing and necessary drainage within the C-103 Canal right-of-way from East Mowry Drive to SW 137th Avenue in Homestead. The scope of services is based upon a 2017 Florida Shared-use Non-Motorized Trail Agreement between the City of Homestead and FDOT. QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 31 12. NAME 13. ROLE IN THIS CONTRACT 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE b. WITH CURRENT FIRMa. TOTAL 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) 15. FIRM NAME AND LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 2 a. b. c. d. (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) e. Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Art Kamm PE, CxA, LEED AP Managing Principal-in-Charge 31 20 R.A. Kamm & Associates, Inc. d/b/a Kamm Consulting, Inc. Deerfield Beach, Florida Mechanical/Electrical Engineering – BSME, 1983 University of Toledo 20182017 X City of Sunrise Welleby Park Improvements – Community Center Sunrise, Florida Demo existing youth fields for new program, five (5) new covered basketball courts, new 15,000 sf multi-purpose building (including gymnasium), refinish existing parking lot Refurbish fields (drainage/re-sod) New concession/scorers building, Refinish & re-quip existing (3) tennis courts and existing (2) racket courts and renovate adjacent restrooms, Renovate existing playground Renovate existing meeting hall and restrooms, renovate adjacent storage building, expand south parking towards the east and tie into existing, upgrade all sports lighting. Refurbish/renovate existing scorer’s tower at baseball fields, refurbish/renovate existing baseball fields and restroom building, security Improvements including cameras, Code Blue and lighting. Role: Managing Principal. 20182017 X Sunset Strip 9 – Sunrise “City Park” Park Renovation Sunrise, Florida Scope included Pull Out – Renovate/Remodel interior spaces (new work), new Restrooms, Splash Pad, Parking Area, two covered bas- ketball courts, full size multi-purpose field with walking paths, theatrical stage with lighting and sound systems, refinish and re-equip two (2) existing tennis courts, security Improvements (Cameras, Code Blue and Lighting) Role: Managing Principal. 20132013 X West Pines Soccer Park & Community Building Pembroke Pines, Florida A freestanding 1,700 square foot meeting room/restroom building and two additional lighted practice soccer fields at the existing West Pines Soccer Park and Nature Preserve. The project includes Bermuda sod and 80/20 soil mix, lighting, electrical, drainage, de-muck & fill, laser grading, irrigation retrofit, bleachers, benches, shade structures, and sidewalks. Role: Managing Principal. Florida Licensed Professional Engineer #44004 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) Ongoing2019 X City of Sunrise - Sunrise Athletic Complex Sunrise, Florida Addition and renovation of a 1,156,848 square foot park. The complex will have a new athletic building, new playground, and new plaza for food vendors or food markets. In addition, three new multi-sport fields will be added along with a concession stand and sports commentator tower. Est. cost: $11.75 Million. Role: Managing Principal. 2 0112 011 X Pembroke Shores YMCA Addition & Renovation Pembroke Pines, Florida A 17,000 square foot addition and phased redevelopment of the existing Pembroke Shores Gymnasium Facility and construction of a 200 vehicle parking lot. Remodeling work was also completed in portions of the existing facility. The existing facility was 100% opera- tional during construction. Cost: $4,200,000. Role: Managing Principal. 10. RELEVANT PROJECTS QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 32 12. NAME 13. ROLE IN THIS CONTRACT 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE b. WITH CURRENT FIRMa. TOTAL 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) 15. FIRM NAME AND LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 2 a. b. c. d. (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) e. Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mircea “Mike” Pella PE, LEED AP, CEM Director of Mechanical Engineering 34 16 R.A. Kamm & Associates, Inc. d/b/a Kamm Consulting, Inc. Deerfield Beach, Florida MSME – 1980 – Mechanical Engineering Bucharest Polytechnic Institute, Romania 20182017 X City of Sunrise Welleby Park Improvements – Community Center Sunrise, Florida Demo existing youth fields for new program, five (5) new covered basketball courts, new 15,000 sf multi-purpose building (including gymnasium), refinish existing parking lot Refurbish fields (drainage/re-sod) New concession/scorers building, Refinish & re-quip existing (3) tennis courts and existing (2) racket courts and renovate adjacent restrooms, Renovate existing playground Renovate existing meeting hall and restrooms, renovate adjacent storage building, expand south parking towards the east and tie into existing, upgrade all sports lighting. Refurbish/renovate existing scorer’s tower at baseball fields, refurbish/renovate existing baseball fields and restroom building, security Improvements including cameras, Code Blue and lighting. Role: Mechanical Engineer. 20172017 X Sunrise Leisure Services Civic Center, Athletic Club and Gymnasium Addition Sunrise, Florida Engineering design for addition. Role: Mechanical Engineer. 20132013 X West Pines Soccer Park & Community Building Pembroke Pines, Florida A freestanding 1,700 square foot meeting room/restroom building and two additional lighted practice soccer fields at the existing West Pines Soccer Park and Nature Preserve. The project includes Bermuda sod and 80/20 soil mix, lighting, electrical, drainage, de-muck & fill, laser grading, irrigation retrofit, bleachers, benches, shade structures, and sidewalks. Role: Mechanical Engineer. Florida Licensed Professional Engineer #48798 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 20162016 X Pembroke Pines Civic Center Pembroke Pines, Florida Multipurpose facility – Mechanical, electrical, plumbing, fire sprinkler and site lighting design for 185,000 sq. ft. office building complex with large data center, multipurpose hall suitable for concerts, exhibitions, banquets, trade shows, kitchen, art gallery, chamber hall and other ancillary spaces. Role: Mechanical Engineer. 2 0112 011 X Pembroke Shores YMCA Addition & Renovation Pembroke Pines, Florida A 17,000 square foot addition and phased redevelopment of the existing Pembroke Shores Gymnasium Facility and construction of a 200 vehicle parking lot. Remodeling work was also completed in portions of the existing facility. The existing facility was 100% opera- tional during construction. Cost: $4,200,000. Role: Mechanical Engineer. 10. RELEVANT PROJECTS QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 33 12. NAME 13. ROLE IN THIS CONTRACT 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE b. WITH CURRENT FIRMa. TOTAL 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) 15. FIRM NAME AND LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 2 a. b. c. d. (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) e. Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Lon T. Carter PE, LEED AP Director of Electrical Engineering 38 17 R.A. Kamm & Associates, Inc. d/b/a Kamm Consulting, Inc. Deerfield Beach, Florida BSEE – 1976 – Electrical Engineering Southern College of Technology, Marietta, Georgia 20152015 X NCCI – Parking Lot Improvements and Photometrics Florida Scope included: adding additional lighting in the South Parking Lot (three poles to match existing with two lighting fixtures per pole) including electrical power and controls. Additional scope of work to include photometric study of existing parking lot with written report of findings in to done in two phases. Role: Electrical Engineer. 20182018 X Gables Park Tower Condo Coral Gables, Florida 40-year electrical recertification of a 44,380 SF parking garage. Our scope is as follows. Perform visual inspections of electrical sys- tems on the above referenced property. Review all prior documentation and/or testing that have been provided to us. Upon completion of our investigation, we will issue a brief summary of our findings/recommendations. Role: Electrical Engineer. 20132013 X West Pines Soccer Park & Community Building Pembroke Pines, Florida A freestanding 1,700 square foot meeting room/restroom building and two additional lighted practice soccer fields at the existing West Pines Soccer Park and Nature Preserve. The project includes Bermuda sod and 80/20 soil mix, lighting, electrical, drainage, de-muck & fill, laser grading, irrigation retrofit, bleachers, benches, shade structures, and sidewalks. Role: Electrical Engineer. Florida Licensed Professional Engineer #35249 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 20172017 X Monarch Gardens – Conversion of Parking Lot Lighting to LED Florida Conversion of existing parking lot lights to LEDs for the tall pole lights in the back and front parking lots and a few lights around the perimeter of the property. Role: Electrical Engineer. 2 0112 011 X Pembroke Shores YMCA Addition & Renovation Pembroke Pines, Florida A 17,000 square foot addition and phased redevelopment of the existing Pembroke Shores Gymnasium Facility and construction of a 200 vehicle parking lot. Remodeling work was also completed in portions of the existing facility. The existing facility was 100% opera- tional during construction. Cost: $4,200,000. Role: Electrical Engineer. 10. RELEVANT PROJECTS QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 34 12. NAME 13. ROLE IN THIS CONTRACT 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE b. WITH CURRENT FIRMa. TOTAL 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) 15. FIRM NAME AND LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 2 a. b. c. d. (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) e. Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Sankar Warier PE Structural Engineer 35 22 Reliance Engineering, Inc. Davie, Florida Ph.D. 2 011 X Lynn University Central Energy Plant Boca Raton, Florida Lynn University Campus Central Energy Plant Building to hold three 1000 Ton Chillers and Cooling Towers. Role: Structural Engineer. Ongoing2020 X Broward County North Mass Transit Bus Lift Pompano Beach, Florida The scope of work for this facility includes design & construction/installation of Rotary Lift EFX90 for articulated buses. This lift has 3 in ground posts (1 stationary post & 2 track movable posts). Work also includes removal of existing concrete slab, relocation of overhead exhaust pipes and construction of new reassessed pit. Role: Structural Engineer. 20202020 X Broward EOC Computer Room Relocation Plantation, Florida The threestory, 42,000 SF steel-reinforced, concrete building was originally constructed in 1997 to withstand winds of 175 mph. Reliance provided structural engineering design and construction administration services for the relocation of the existing computer room and affili- ated building systems within the existing EOC. Cost: $500,000. Role: Structural Engineer. Florida P.E. and S.I. Several State Registrations / Professional Member of ASCE, ACI and AISC. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) Ongoing2020 X Ravenswood Transit Facility Enhancement & Retrofit Dania Beach, Florida Renovations and modernization to the facility's infrastructure including replacement of automatic gates, building structural repair, parking garage grading/drainage, and exterior renovation to protect underground fuel storage tanks. Role: Structural Engineer. Ongoing2020 X Broward County Booher Building Lobby Expansion Coral Springs, Florida Security enhancement and entrance remodel to the County's Booher Building. Role: Structural Engineer. 10. RELEVANT PROJECTS 2013 QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 35 12. NAME 13. ROLE IN THIS CONTRACT 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE b. WITH CURRENT FIRMa. TOTAL 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) 15. FIRM NAME AND LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 2 a. b. c. d. (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) e. Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Dave Bodker RLA Landscape Architect 41 32 Dave Bodker Landscape Architecture/Planning, Inc. Delray Beach, Florida Bachelor of Landscape Architecture Louisiana State University 20162016 X Coconut Creek Engineering Building Coconut Creek, Florida Planting and irrigation design for addition to city engineering buildings. Role: Landscape Architect. 20132012 X Coconut Creek Public Works Coconut Creek, Florida Planting and irrigation design for public works facility approximately 1.6 acre site. Role: Landscape Architect. Ongoing2019 X City of Weston Fire Station No. 21 Weston, Florida Planting and irrigation design for new fire station. Role: Landscape Architect. Florida - Landscape Architect E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) Ongoing2019 X City of Sunrise Athletic Complex Sunrise, Florida Addition and renovation of a 1,156,848 square foot park. The complex will have a new athletic building, new playground, and new plaza for food vendors or food markets. In addition, three new multi-sport fields will be added along with a concession stand and sports commentator tower. Est. Cost: $11,700,000. Role: Landscape Architect. 20092008 X Murray Nelson Governmental & Cultural Center Key Largo, Florida Planting and irrigation design for office building/cultural center and associated playground approximately 4.5 acre site. Role: Landscape Architect. 10. RELEVANT PROJECTS QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 36 12. NAME 13. ROLE IN THIS CONTRACT 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE b. WITH CURRENT FIRMa. TOTAL 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) 15. FIRM NAME AND LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 2 a. b. c. d. (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) e. Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Keith LeBlanc PE Geotechnical Engineer 30 30 Federal Engineering & Testing, Inc. Oakland Park, Florida B.S. Petroleum Engineering- Specialized in Geotechnical Engineering 2019City of Tamarac- Swim Center Annex Park Performed subsoil investigation for proposed pavilion and pedestrian bridge. Role: Geotechnical Engineer. 2018City of Pompano Beach - Reuse System NE Expansion Performed QC laboratory and field testing on pipe backfill in roadways as well as sidewalk and curb repairs. Role: Geotechnical Engineer. 2016Broward County - NW 38th Street Improvements (LAP Project) Performed laboratory and field testing on road widening and sidewalk improvements, as well as asphalt paving monitoring inspections. Acted as QC Jab for the contractor. Role: Geotechnical Engineer. State of Florida Engineering License #59394 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 2018/2019City of Hollywood - Montella Park Restroom Performed subsoil investigation for proposed bathroom building. Role: Geotechnical Engineer. X X X X X 10. RELEVANT PROJECTS 2016Broward County - Martin Luther King Jr. Blvd. Improvements Performed laboratory and field testing on road improvements. Acted as verification lab for the CEI. Role: Geotechnical Engineer. QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 37 12. NAME 13. ROLE IN THIS CONTRACT 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE b. WITH CURRENT FIRMa. TOTAL 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) 15. FIRM NAME AND LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 2 a. b. c. d. (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) e. Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Sven Jetzkewitz Geotechnical Operations Manager 21 16 Federal Engineering & Testing, Inc. Oakland Park, Florida A.A. Engineering - Specialized in Geotechnical Engineering 2019City of Tamarac- Swim Center Annex Park Performed subsoil investigation for proposed pavilion and pedestrian bridge. 2018City of Pompano Beach - Reuse System NE Expansion Performed QC laboratory and field testing on pipe backfill in roadways as well as sidewalk and curb repairs. 2016Broward County - NW 38th Street Improvements (LAP Project) Performed laboratory and field testing on road widening and sidewalk improvements, as well as asphalt paving monitoring inspections. Acted as QC Jab for the contractor. State of Florida Inspector License# BN6643 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 2018/2019City of Hollywood - Montella Park Restroom Performed subsoil investigation for proposed bathroom building. X X X X X 10. RELEVANT PROJECTS 2016Broward County - Martin Luther King Jr. Blvd. Improvements Performed laboratory and field testing on road improvements. Acted as verification lab for the CEI. F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified.Complete one Section F for each project.) a. PROJECT OWNER 21. TITLE AND LOCATION (City and State) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 20. EXAMPLE PROJECT KEY NUMBER a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 3 (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. POINT OF CONTACT NAME 23. PROJECT OWNER'S INFORMATION c. POINT OF CONTACT TELEPHONE NUMBER (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified.Complete one Section F for each project.) a. PROJECT OWNER 21. TITLE AND LOCATION (City and State) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 20. EXAMPLE PROJECT KEY NUMBER a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 3 (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. POINT OF CONTACT NAME 23. PROJECT OWNER'S INFORMATION c. POINT OF CONTACT TELEPHONE NUMBER (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified.Complete one Section F for each project.) SF 330 Form2. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 38 SIZE: Various Sizes CONSTRUCTION COST: ≤ $2,000,000 RELEVANCY Government Facilities Continuing Services Contract Similar Type Projects Same Team Past Five Years Broward County Jeffrey Thompson, Assistant Director (954) 357-8460 1 1993-1997/ 2001-2004/ 2006-2009/ 2011-2016/ 2016-Present 1993-1997/ 2001-2004/ 2006-2009/ 2011-2016/ 2016-Present Broward County Continuing Contract | Broward County, FL Federal Engineering & Testing, Inc.Oakland Park, Florida Geotechnical Engineering Under the firm’s continuing contract with Broward County for OVER 27 YEARS (recently renewed), SMA has been involved with multiple projects with varying scopes, sizes and costs. Some of these projects included the Office Renovations, Main Library Learning Lab, North Board of Health Parking Lot expansion, a Transit Support Building, offices for the IT Department, and various Reports and Studies, among others. Past Five Years • Convention Center Design Criteria • Electric Bus Charging Infrastructure • Fourth Floor Renovation at Government Center West • First Floor Renovation at Government Center East • Judicial Complex • Judges Bench Convention Center Design Criteria Electric Bus Charging Infrastructure Transit Support Center Saltz Michelson Architects, Inc.Fort Lauderdale, Florida Architectural Planning & Design Holland Engineering, Inc.Fort Lauderdale, Florida Civil Engineering Kamm Consulting, Inc.Deerfield Beach, Florida MEP Engineering Reliance Engineering, Inc.Davie, Florida Structural Engineering Dave Bodker Landscape Architecture/Planning, Inc.Delray Beach, Florida Landscape Architecture F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified.Complete one Section F for each project.) a. PROJECT OWNER 21. TITLE AND LOCATION (City and State) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 20. EXAMPLE PROJECT KEY NUMBER a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 3 (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. POINT OF CONTACT NAME 23. PROJECT OWNER'S INFORMATION c. POINT OF CONTACT TELEPHONE NUMBER (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified.Complete one Section F for each project.) a. PROJECT OWNER 21. TITLE AND LOCATION (City and State) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 20. EXAMPLE PROJECT KEY NUMBER a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 3 (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. POINT OF CONTACT NAME 23. PROJECT OWNER'S INFORMATION c. POINT OF CONTACT TELEPHONE NUMBER (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified.Complete one Section F for each project.) SF 330 Form2. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 39 SIZE: Various CONSTRUCTION COSTS: Various SCOPE: Full A/E Services RELEVANCY Continuing Contract Miami-Dade County Similar Type Projects Same Team Members Firm Experience Past Five Years Miller Legg & Associates, Inc.Miami, Florida Survey Holland Engineering, Inc.Fort Lauderdale, FL Civil Engineering Saltz Michelson Architects, Inc.Fort Lauderdale/Doral, Florida Architectural Planning & Design Miami-Dade County Public Schools Mike Silva, Project Manager II (305) 995-4275 2013 - Present 2013 - PresentMiami-Dade County Public Schools (Continuing Contract) 2 Under the firm’s CONTINUING CONTRACT with Miami-Dade County Public Schools, GENERAL OBLIGATION BOND renovation projects for eleven schools including field verification, scope validation, design development and construction administration. Work for these three schools includes renovations and new mechanical, plumbing, and electrical infrastructure; architectural renovations to entry canopies, playgrounds and window/storefront replacements. SREF requirements were adhered to. Schools include: • Avocado Elementary School • Georgia Jones-Ayers Middle School • Hialeah Middle School • Lawton Chiles Middle School • Meadowlane Elementary School • North County K-8 Center • North Twin Lakes Elementary • Parkway Elementary • Village Green Elementary • Winston Park K-8 Center F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified.Complete one Section F for each project.) a. PROJECT OWNER 21. TITLE AND LOCATION (City and State) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 20. EXAMPLE PROJECT KEY NUMBER a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 3 (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. POINT OF CONTACT NAME 23. PROJECT OWNER'S INFORMATION c. POINT OF CONTACT TELEPHONE NUMBER (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified.Complete one Section F for each project.) a. PROJECT OWNER 21. TITLE AND LOCATION (City and State) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 20. EXAMPLE PROJECT KEY NUMBER a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 3 (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. POINT OF CONTACT NAME 23. PROJECT OWNER'S INFORMATION c. POINT OF CONTACT TELEPHONE NUMBER (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified.Complete one Section F for each project.) SF 330 Form2. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 40 Memorial Healthcare System Joseph Alcure, Jr., Director of Construction (retired)(954) 347-6555 1995 - Present 1995 - PresentMemorial Healthcare System Continuing Contract | Broward Co., FL 3 Under our OPEN-ENDED CONTRACT (twenty-five consecutive years) with the South Broward District/Memorial Healthcare System, we have been the architects for numerous AHCA approved projects within its six hospitals and other medical facility projects including cancer centers, urgent care centers, women's centers, rehabilitation facilities, parking garages, medical office buildings, surgery centers, facade renovations, a data center and many other large and small projects. SIZE: Various CONSTRUCTION COST: $50K - $28M SCOPE: Full A/E Services, LEED AP RELEVANCY Continuing Services Contract Public/Essential Facilities Same Team Past Five Years Saltz Michelson Architects, Inc.Fort Lauderdale, Florida Architectural Planning & Design Holland Engineering, Inc.Fort Lauderdale, Florida Civil Engineering Kamm Consulting, Inc.Deerfield Beach, Florida MEP Engineering Dave Bodker Landscape Architecture/Planning, Inc.Delray Beach, Florida Landscape Architecture F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified.Complete one Section F for each project.) a. PROJECT OWNER 21. TITLE AND LOCATION (City and State) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 20. EXAMPLE PROJECT KEY NUMBER a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 3 (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. POINT OF CONTACT NAME 23. PROJECT OWNER'S INFORMATION c. POINT OF CONTACT TELEPHONE NUMBER (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified.Complete one Section F for each project.) a. PROJECT OWNER 21. TITLE AND LOCATION (City and State) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 20. EXAMPLE PROJECT KEY NUMBER a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 3 (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. POINT OF CONTACT NAME 23. PROJECT OWNER'S INFORMATION c. POINT OF CONTACT TELEPHONE NUMBER (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified.Complete one Section F for each project.) SF 330 Form2. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 41 This new building of approximately 7,224 SF and site were designed and built to “LEED Silver Standards” for sustainability. Design of the new station’s massing and scale was sensitive to its surrounding residential properties and designed to have its higher areas away from the low adjacent residential properties. This facility contains 9 sleeping bunk rooms, a kitchen/dining room, day room, exercise room, office and watch room. In addition it has 2 large apparatus bays with support spaces of bunker gear, storage, medical and other building support areas. SIZE: 7,224 Square Feet CONSTRUCTION COST: $3,145,000 SCOPE: Full A/E Services RELEVANCY Municipal Facility Essential Services Facility Similar Type Project Past Five Years City of Hollywood Walter Wernecke, Architect (954) 921-3900 ext 3457 4 City of Hollywood Fire Station No. 45 | Hollywood, FL 2019 2019 Saltz Michelson Architects, Inc.Fort Lauderdale, Florida Architectural Planning & Design Dave Bodker Landscape Architecture/Planning, Inc.Delray Beach, Florida Landscape Architecture F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified.Complete one Section F for each project.) a. PROJECT OWNER 21. TITLE AND LOCATION (City and State) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 20. EXAMPLE PROJECT KEY NUMBER a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 3 (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. POINT OF CONTACT NAME 23. PROJECT OWNER'S INFORMATION c. POINT OF CONTACT TELEPHONE NUMBER (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified.Complete one Section F for each project.) a. PROJECT OWNER 21. TITLE AND LOCATION (City and State) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 20. EXAMPLE PROJECT KEY NUMBER a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 3 (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. POINT OF CONTACT NAME 23. PROJECT OWNER'S INFORMATION c. POINT OF CONTACT TELEPHONE NUMBER (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified.Complete one Section F for each project.) SF 330 Form2. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 42 Under our CONTINUING CONTRACT with the City of Weston, this project includes the renovation of 15 park restroom buildings located at various parks throughout the city. The scope of the work includes complete internal demo and reinstallation of new fixtures, partitions, floor and wall tile surfaces, and restroom accessories. The restrooms finishes utilized full height “sheet” wall tile to minimize grout lines and seams with the material. The result not only adds to the visual impact but helps in maintaining the life of the material. Sizes of restrooms in this project range from 2-5 stalls each. SIZE: 15 Restroom Buildings COST: $1,700,000 SCOPE: Full A/E Services RELEVANCY Municipal Project Continuing Contract Similar Type Project Same Team Members Past Five Years The City of Weston Karl Thompson, PE, Director of Public Works (954) 385-2600 5 Saltz Michelson Architects, Inc.Fort Lauderdale, Florida Architectural Planning & Design 2016 2016City of Weston Park Restroom Building Renovations | Weston, FL Kamm Consulting, Inc.Deerfield Beach, Florida MEP Engineering F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified.Complete one Section F for each project.) a. PROJECT OWNER 21. TITLE AND LOCATION (City and State) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 20. EXAMPLE PROJECT KEY NUMBER a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 3 (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. POINT OF CONTACT NAME 23. PROJECT OWNER'S INFORMATION c. POINT OF CONTACT TELEPHONE NUMBER (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified.Complete one Section F for each project.) a. PROJECT OWNER 21. TITLE AND LOCATION (City and State) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 20. EXAMPLE PROJECT KEY NUMBER a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 3 (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. POINT OF CONTACT NAME 23. PROJECT OWNER'S INFORMATION c. POINT OF CONTACT TELEPHONE NUMBER (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified.Complete one Section F for each project.) SF 330 Form2. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 43 Saltz Michelson Architects, Inc.Fort Lauderdale, Florida Architectural Planning & Design Broward College Deborah Czubkowski, District Dir. Design/Construction (954) 201-6900 1995 – 2010/ 2012 - Present 1995 – 2010/ 2012 - PresentBroward College Continuing Services Contract | Broward Co., FL 6 Successful completion of multiple college remodeling projects under the firm’s CONTINUING CONTRACT with Broward College (recently renewed) on all four of their campuses. Projects have included: y Building 47 Renovation y Library Waterproofing y Downtown Facade Renovation y Will & Jo Holcombe Institute for Higher Learning y Building 8 Dental Lab y Nursing Lab and Clinical Practice y Broward College/FAU Plaza y Student Affairs Center y Maroone Automotive Training Facility y Aviation Building 99 y Tarmac Design for 727 y Accounting Offices Renovations Conference Center Building 47 Facade Renovation SIZE: Various CONSTRUCTION COSTS: ≤ $2,000,000 SCOPE: Full A/E Services RELEVANCY Continuing Services Contract Similar Type Projects Same Team Members Past Five Years Holland Engineering, Inc.Fort Lauderdale, Florida Civil Engineering Kamm Consulting, Inc.Deerfield Beach, Florida MEP Engineering F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified.Complete one Section F for each project.) a. PROJECT OWNER 21. TITLE AND LOCATION (City and State) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 20. EXAMPLE PROJECT KEY NUMBER a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 3 (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. POINT OF CONTACT NAME 23. PROJECT OWNER'S INFORMATION c. POINT OF CONTACT TELEPHONE NUMBER (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified.Complete one Section F for each project.) a. PROJECT OWNER 21. TITLE AND LOCATION (City and State) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 20. EXAMPLE PROJECT KEY NUMBER a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 3 (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. POINT OF CONTACT NAME 23. PROJECT OWNER'S INFORMATION c. POINT OF CONTACT TELEPHONE NUMBER (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified.Complete one Section F for each project.) SF 330 Form2. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 44 Addition and renovation of a 1,156,848 square foot park. The complex will have a new athletic building, new playground, and new plaza for food ven- dors or food markets. In addition, three new multi-sport fields will be added along with a concession stand and sports commentator tower. SIZE: 1,156,848 Square Feet CONSTRUCTION COST: $11,750,000 SCOPE: Full A/E Services RELEVANCY Municipal Project Similar Type Project Same Team Past Five Years The City of Sunrise Meghan Kaufold, Project Manager (954) 888-6070 7 2020 OngoingCity of Sunrise Athletic Complex | Sunrise, FL Saltz Michelson Architects, Inc.Fort Lauderdale, Florida Architectural Planning & Design Holland Engineering, Inc.Fort Lauderdale, Florida Civil Engineering Kamm Consulting, Inc.Deerfield Beach, Florida MEP Engineering Dave Bodker Landscape Architecture/Planning, Inc.Delray Beach, Florida Landscape Architecture F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified.Complete one Section F for each project.) a. PROJECT OWNER 21. TITLE AND LOCATION (City and State) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 20. EXAMPLE PROJECT KEY NUMBER a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 3 (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. POINT OF CONTACT NAME 23. PROJECT OWNER'S INFORMATION c. POINT OF CONTACT TELEPHONE NUMBER (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified.Complete one Section F for each project.) a. PROJECT OWNER 21. TITLE AND LOCATION (City and State) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 20. EXAMPLE PROJECT KEY NUMBER a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 3 (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. POINT OF CONTACT NAME 23. PROJECT OWNER'S INFORMATION c. POINT OF CONTACT TELEPHONE NUMBER (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified.Complete one Section F for each project.) SF 330 Form2. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 45 Lauderhill Police Department Building Expansion, Lauderhill, FL: Programming and design criteria for a new single-story building, approximately 5,000 SF expansion to include gun range, scenario rooms, office space, dining room, computer room, classroom, and miscellaneous support functions. Contact: Allen Siegel, Deputy Chief, (954) 714-4809. Wolk Park | Lauderhill, FL: Design criteria package for a design/build park improvements project. The proposed project elements include a new building, rehab tennis courts and pool, new fencing, new pavilion, and children's splash pad. Contact: Scott Newton, Assistant Director Parks, (954) 730-3084. City of Lauderhill (See Below)(See Below) 8 City of Lauderhill Continuing Services Contract | Lauderhill, FL Saltz Michelson Architects, Inc. Holland Engineering, Inc. Kamm Consulting, Inc. Fort Lauderdale, Florida Fort Lauderdale, Florida Deerfield Beach, Florida Architectural Planning & Design Civil Engineering MEP Engineering 2019 N/A SCOPE: A/E Design Criteria RELEVANCY Municipal Facilities Continuing Services Contract Similar Type Projects Same Team Members Past Five Years Design Criteria F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified.Complete one Section F for each project.) a. PROJECT OWNER 21. TITLE AND LOCATION (City and State) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 20. EXAMPLE PROJECT KEY NUMBER a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 3 (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. POINT OF CONTACT NAME 23. PROJECT OWNER'S INFORMATION c. POINT OF CONTACT TELEPHONE NUMBER (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified.Complete one Section F for each project.) a. PROJECT OWNER 21. TITLE AND LOCATION (City and State) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 20. EXAMPLE PROJECT KEY NUMBER a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 3 (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. POINT OF CONTACT NAME 23. PROJECT OWNER'S INFORMATION c. POINT OF CONTACT TELEPHONE NUMBER (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified.Complete one Section F for each project.) SF 330 Form2. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 46 WXEL-TV/PBS Reglazing & Roof Replacement Boynton Beach, FL Complete roof replacement, curtain wall (building envelope) replacement and emergency back-up A/C system for control rooms support. New glazing storefront and window systems along select areas of the east, north and west sides of the building were removed and reinstalled. The work was coordinated and completed in phases so the facility could remain in operation during construction. Contact: Ms. Elvie Rubio, Senior Projects Architect, (850) 487-0796.Existing New Roof SIZE: 33,000 SF | 6,700 SF COST: $1,500,000 | $650,000 SCOPE: Full A/E Services RELEVANCY Government Facilities Continuing Services Contract Similar Type Projects Same Team Members Building Envelope Replacement Past Five Years Lantana Motorist Services Renovations Lantana, FL Renovation of a 6,700 SF office building for the Florida Highway Safety and Motor Vehicles Department. Project includes new office and training room layout, ADA compliant bathrooms and transaction counter, new finishes throughout, new A/C unit and duct work throughout, new roof system and new exterior windows and doors. Contact: Mr. Mark Faison, Construction Project Consultant II, (850) 487-9923. FL Department of Management Services (See below)(See below) 9 Florida Department of Management Services | Continuing Contract Saltz Michelson Architects, Inc.Fort Lauderdale, Florida Architectural Planning & Design Holland Engineering, Inc.Fort Lauderdale, Florida Civil Engineering Reglazing 2015/2018 2015/2018 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified.Complete one Section F for each project.) a. PROJECT OWNER 21. TITLE AND LOCATION (City and State) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 20. EXAMPLE PROJECT KEY NUMBER a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 3 (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. POINT OF CONTACT NAME 23. PROJECT OWNER'S INFORMATION c. POINT OF CONTACT TELEPHONE NUMBER (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified.Complete one Section F for each project.) a. PROJECT OWNER 21. TITLE AND LOCATION (City and State) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 20. EXAMPLE PROJECT KEY NUMBER a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 3 (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. POINT OF CONTACT NAME 23. PROJECT OWNER'S INFORMATION c. POINT OF CONTACT TELEPHONE NUMBER (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified.Complete one Section F for each project.) SF 330 Form2. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 47 The Hollywood West Sports Park was an obsolete community park which outlived its usefulness to and was under utilized by the community. After a public referendum to issue a General Obligation Bond was passed by the City of Hollywood, Florida voters in 2004, along with a $100,000 grant from Broward County, the City engaged Saltz Michelson Architects to master plan the 12.24 acre site, create a new 10,195 square foot community center with full kitchen, and redevelop the sports park into a contemporary state-of-the-art facility. The new sports park contains a baseball field, multi-use regulation soccer/football field, 2 intramural soccer fields, a skate park, tot lot, outdoor play area, covered seating areas, outdoor performance stage, concession/ toilets and storage building, along with the community center, all illuminated for nighttime use. In addition the existing 55 parking spaces were increased to 152. SMA was able to preserve the 75 existing oak trees, which were incorporated into the design. SIZE: 10,195 SF / 12.24 Acres CONSTRUCTION COST: $6,300,000 SCOPE: Full A/E Services RELEVANCY Municipal Facility Similar Type Project Same Team Members City of Hollywood Terrence Comiskey, AIA, Sr. Project Manager (954) 921-3901 10 Saltz Michelson Architects, Inc. Holland Engineering, Inc. Fort Lauderdale, Florida Fort Lauderdale, Florida Architectural Planning & Design Civil Engineering 2008 2008 Boulevard Heights Community Center & Hollywood West Sports ParkHollywood, FL QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 48 TITLE OF EXAMPLE PROJECT (From Section F) G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 1 2 3 4 5 6 7 8 9 10 STANDARD FORM 330 (REV. 8/2016) PAGE 4 26. NAMES OF KEY PERSONNEL (From Section E, Block 12) 27. ROLE IN THIS CONTRACT (From Section E, Block 13)12345678910 29. EXAMPLE PROJECTS KEY NUMBER TITLE OF EXAMPLE PROJECT (From Section F)NUMBER 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in "Example Projects Key" section below before completing table. Place "X" under project key number for participation in same or similar role.) Charles Michelson Architect/Principal-In-Charge Sheff Devier Norman Schwartz Maday Gutierrez Frida Dunayer Juan Pablo Garcia Architect/Sr. Project Manager Architect/Project Manager Architect/Project Manager Interiors/Project Manager BIM Manager Broward County Continuing Services Contract Broward College Continuing Services Contract Miami-Dade County Public Schools Continuing Services Contract City of Sunrise City Park Memorial Healthcare System Continuing Contract City of Lauderhill Continuing Services Contract City of Hollywood Fire Station No. 45 Florida Department of Management Services Continuing Services Contract City of Weston Continuing Services Contract Boulevard Heights Community Center & Hollywood West Sports Park Ayitey Aryee Sven Jetzkewitz Keith LeBlanc Art Kamm Dylan Larson Susan Holland Michael Kroll Martin Rossi Karen Lynch Mircea Pella Lon Carter Sankar Warier Principal/Landscape Architecture Senior Project Surveyor Project Surveyor Civil Engineer Geotechnical Operations Geotechnical Engineer Managing Principal MEP Environmental Specialist Civil Engineer Mechanical Engineer Electrical Engineer Structural Engineer Dave Bodker Landscape Architect QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 49 H. ADDITIONAL INFORMATION 30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED. I. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. 31. SIGNATURE 32. DATE 33. NAME AND TITLE STANDARD FORM 330 (REV. 8/2016) PAGE 5 Charles A. Michelson, AIA, ACHA, LEED AP, President 08/18/2020 City of Coconut Creek City of Coral Springs City of Hollywood City of Key West City of Lauderhill City of Lauderdale Lakes City of Margate City of Miramar City of North Lauderdale City of North Miami Beach City of Oakland Park City of Palm Beach Gardens City of Parkland City of Pembroke Pines City of Sunny Isles City of Sunrise City of Tamarac City of Weston Town of Davie Village of Wellington Broward College Broward County Broward Sheriff’s Office Miami-Dade County Miami-Dade County Public Schools Palm Beach County State of Florida Dept. of Health (7 Counties) State of Florida Dept. of Management Services (6 Counties) State of Florida Dept. of Transportation Broward Health Memorial Healthcare System School Board of Broward County University of Miami Sampling of Current & Past Public Contracts: HEALTHCARE DESIGN SHOWCASE 82 AUGUST 2019 / SUPPLEMENT TO HEALTHCARE DESIGN Urgent Care facilities represent the future direction of healthcare for our communities, as non-critical medical treatment is becom- ing decentralized from hospital campuses. This project developed a vacant parcel of land for a new 5,259-square-foot, one-story Urgent Care Center. This facility’s exterior is identifiable and modern—representing an image of the state- of-the-art treatment within. We broke from an “all stucco” box to mix and match the use of exterior materials such as storefront, stuc- co scored walls, metal soffits, and corner wall accents made of ceramic tiles possessing the soft appearance of “wood planks”. A strong working relationship with admin- istrators, medical professionals, local politi- cians and City emergency responders was established from the beginning to under- stand the project’s priorities and program- ming needs. Open communication with the team allowed the program to be reviewed on an ongoing basis, ensuring that the right combination of service, quality and cost consciousness was achieved. This ongoing dialog drastically reduced the need for any change orders. With the end user in mind, an environ- ment was created which is conducive to serv- ing the public’s immediate medical needs. There was careful analysis of the number of visits, treatments provided, and efficient patient flows. Our design provides an effec- tive layout that allows multiple patients to be treated simultaneously, close proximity to x-ray and procedure spaces, and excellent visibility by the medical staff. Since cost is an important issue in healthcare design, this program was achieved in as little space as possible with shell space available for future expansion. OUTPATIENT/AMBULATORY CARE CENTER Memorial Urgent Care Center Hollywood, Fla. SUBMITTED BY: SALTZ MICHELSON ARCHITECTS INC. (FORT LAUDERDALE, FLA.) PROJECT CATEGORY: New construction CHIEF ADMINISTRATOR: Albert Rego, administrative director, ambulatory care, Memorial Healthcare System FIRM: Saltz Michelson Architects Inc., www.saltzmichelson.com DESIGN TEAM: Saltz Michelson Architects Inc. (architect and interior designer); Holland Engineering Inc. (civil engineer); SGM Engineering Inc. (MEP-FP design services); Brill Rodriguez Salas & Associates Inc. (structural engineer); Land Art Planning & Design LLC (landscape architect) PHOTOGRAPHY: ©2018 J. Christopher Photography, Inc. TOTAL BUILDING AREA (SQ. FT.): 5,259 CONSTRUCTION COST/SQ. FT.: $380 TOTAL CONSTRUCTION COST (EXCLUDING LAND): $2 million COMPLETED: November 2018 HEALTHCARE DESIGN SHOWCASE 82 AUGUST 2019 / SUPPLEMENT TO HEALTHCARE DESIGN New trends in designing addiction recovery centers show a greater respect for the patients and safety of the staff. As such, we approached the design of the County managed and run recovery center from a perspective of behavioral health design, focused on executing best practices and appropriate design solu- tions in a compassionate, safe setting. Good design can influence medical outcomes. The architecture is contem- porary and portrays modern care with a comfortable, safe working environ- ment for the staff, while the use of stone and building massing provides a strong government signature. Although the building’s exterior presents itself as a monumental institutional facility, the human scale of the entry to the recep- tion area creates a feeling of intimacy and mental comfort much needed by clients and their family members. The building’s functionality and in- terior design concepts ultimately serve four areas: outpatient services, inpa- tient detox, counseling, and adminis- tration. It was important for the clients to make each department in the facility easily identifiable to provide the user with a clear route to their intended lo- cation. This was achieved through the use of various colors throughout the building as well as color-coordinated signage. Designed to achieve LEED gold cer- tification, an important building fea- ture is the central courtyard, which provides natural light throughout the two-story, 51,419-square-foot building and includes benches, landscaping, a water feature, and sculptures designed by local artists. Clients also have access to a large outdoor activity area that in- cludes a sand volleyball court. BEHAVIORAL HEALTH CENTER Broward Addiction Recovery Center (BARC) Fort Lauderdale, Fla. SUBMITTED BY: SALTZ MICHELSON ARCHITECTS INC. (FORT LAUDERDALE, FLA.) PROJECT CATEGORY: New construction CHIEF ADMINISTRATOR: Jack Feinberg, division director, BARC FIRM: Saltz Michelson Architects Inc., www.saltzmichelson.com DESIGN TEAM: Saltz Michelson Architects Inc. (architect and interior designer); Chen Moore and Associates Inc. (civil engineer and landscape architect); Johnson, Avedano, Lopez, Rodriguez & Walewski Engineering Group Inc. (JALRW) (MEP engineer); DeRose Design Consultants Inc. (structural engineer); The Spinnaker Group Inc. (LEED consultant); Merlino Associates LLC (foodservice design consultant) PHOTOGRAPHY: ©2018 J. Christopher Photography Inc. TOTAL BUILDING AREA (SQ. FT.): 51,419 CONSTRUCTION COST/SQ. FT.: $368 TOTAL CONSTRUCTION COST (EXCLUDING LAND): $18.9 million COMPLETED: May 2018 QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 50 H. ADDITIONAL INFORMATION 30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED. I. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. 31. SIGNATURE 32. DATE 33. NAME AND TITLE STANDARD FORM 330 (REV. 8/2016) PAGE 5 Charles A. Michelson, AIA, ACHA, LEED AP, President 08/18/2020 2019 Fort Lauderdale Chapter of the American Institute of Architects Gold Member Service Award 2019 Florida/Caribbean Chapter of the American Institute of Architects Firm of the Year Award. 2017 Fort Lauderdale Chapter of the American Institute of Architects Firm of the Year Award. 2017 Fort Lauderdale Chapter of the American Institute of Architects Board of Directors Design Award for the Design of Quantum Marine. 2017 Fort Lauderdale Chapter of the American Institute of Architects Peoples Choice Award for the Design of Quantum Marine. 2015 Fort Lauderdale Chapter of the American Institute of Architects Merit Award for the STBN Surgery Center new building. 2011 City of Delray Beach “New Commercial Development” Award for Midtown Medical Building. 2006 ABC (Associated Builders and Contractors, Inc.) “Construction Award of Excellence” for Baptist Parking Garage No. 5 in Miami. 2005 Real Estate & Construction Review’s “Plaque of Honor” for the Memorial Hospital West Medical Office Building and Parking Garage, recognizing it as one of the top projects in Florida. 2005 ABC (Associated Builders and Contractors, Inc.) “Finalist Award” for Associate Business of the Year (less than 50 employees). 2004 City of Fort Lauderdale “Community Appearance Award” for outstanding achievement in Urban Environmental Design for La Cascade, a 22 unit eight-story luxury condominium. 2003 South Florida Business Journal “Deal of the Year” for Memorial Healthcare System 76,000 SF build-out of Administrative Offices. 2003 FEFPA (Florida Educational Facilities Planners Association) First Place Award for the Façade Renovation of Broward Community College Phase III Downtown Campus. 2002 Fort Lauderdale Chapter of the American Institute of Architects Design Award for the Façade Renovation of Broward Community College Phase III Downtown Campus. 1999 Fort Lauderdale Chapter of the American Institute of Architects Design Award for the Offices of Saltz Michelson Architects. 1999 South Florida Business Journal “Best Retail Deal of the Year” for Cross County Plaza. 1999 South Florida Business Journal “Best Public/Private Deal” for Cypress Creek Park & Ride site. 1999 Greater Hollywood Chamber of Commerce “Project Pride Award” for Esther L. Grossman Women’s Health & Resource Center. 1999 Greater Hollywood Chamber of Commerce “Project Pride Award” for Emerald Park Assisted Living Facility. 1998 Town of Davie “Western Theme Landmark Building Award” (Day Care Center). 1996 City of Fort Lauderdale Community Appearance Award “For Outstanding Achievement in Urban Environmental Design Special Projects” for Elevated Skywalk at the Broward Center for the Performing Arts. 1996 City of Fort Lauderdale Community Appearance Award “For Outstanding Achievement in Urban Environmental Design Civic and Institutional Projects” for Elevated Skywalk at the Broward Center for the Performing Arts. 1990 Town of Davie “Western Theme Landmark Building Award” (Shopping Center). 1987 “City of Hollywood Beautification Award” for 3810 Hollywood Boulevard Office Building. 1987 City of Fort Lauderdale Community Appearance Board’s Award “For Outstanding Achievement in Urban Environmental Design” for Las Olas Hospital Medical Office Building. 1987 “Craftsmanship Award” for Cohen and Cohen Office Building. 1984 Davie-Cooper City Chamber of Commerce Beautification “Best Commercial Building Award” for Emerald Park Office Center. 1979 “Honor Award” for excellence in design of residence, Broward Chapter, A.I.A. Awards: QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 51 PART II - GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) a. SIGNATURE ARCHITECT-ENGINEER QUALIFICATIONS 2a. FIRM (or Branch Office) NAME 2b. STREET 2c. CITY 2d. STATE 2e. ZIP CODE 3. YEAR ESTABLISHED 4. UNIQUE ENTITY IDENTIFIER 5. OWNERSHIP b. Discipline c. Number of Employees 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS b. Experience c. Revenue Index Number (see below) STANDARD FORM 330 (REV. 8/2016) PAGE 6 1. SOLICITATION NUMBER (If any) 8a. FORMER FIRM NAME(S) (If any)8b. YEAR ESTABLISHED 9. EMPLOYEES BY DISCIPLINE Total (1) FIRM (2) BRANCH 1. Less than $100,000 2. $100,000 to less than $250,000 3. $250,000 to less than $500,000 4. $500,000 to less than $1 million 5. $1 million to less than $2 million 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) 7. NAME OF FIRM (If Block 2a is a Branch Office) 6a. POINT OF CONTACT NAME AND TITLE 6c. E-MAIL ADDRESS 8c. UNIQUE ENTITY IDENTIFIER a. Federal Work b. Non-Federal Work c. Total Work 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. b. DATE c. NAME AND TITLE a. Function Code a. Profile Code 6b. TELEPHONE NUMBER a. TYPE b. SMALL BUSINESS STATUS PROFESSIONAL SERVICES REVENUE INDEX NUMBER 6. $2 million to less than $5 million 7. $5 million to less than $10 million 8. $10 million to less than $25 million 9. $25 million to less than $50 million 10. $50 million or greater Other Employees 20-07-01 Saltz Michelson Architects, Inc. Doral Charles A. Michelson, AIA, ACHA, LEED AP, President 305.764.3138 Mark L. Saltz Architects, Inc. Mark L. Saltz, AIA, Architect 1980 1976 SMA@SaltzMichelson.com FL Charles A. Michelson, AIA, ACHA, LEED AP, President 08/18/2020 33166 1996 Corporation 94-585-1731 94-585-1731 94-585-1731 CBE 8400 NW 36th Street, #450 02 7 1 1 C10 5 E02 8 Administrative Commercial Bldg, Shopping Centers Educational Facilities Architect Community Facilities Field Houses, Gyms, Stadiums CADD Technician Computer Facilities Garages, Parking Decks Project Manager Interior Design Design-Build Hospital/Medical Facilities 06 7 6 C 11 6 F02 2 08 11 6 C13 3 G01 5 48 37 3 1 28 1 D04 7 H09 8 Saltz Michelson Architects, Inc. QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 52 PART II - GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) a. SIGNATURE ARCHITECT-ENGINEER QUALIFICATIONS 2a. FIRM (or Branch Office) NAME 2b. STREET 2c. CITY 2d. STATE 2e. ZIP CODE 3. YEAR ESTABLISHED 4. UNIQUE ENTITY IDENTIFIER 5. OWNERSHIP b. Discipline c. Number of Employees 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS b. Experience c. Revenue Index Number (see below) STANDARD FORM 330 (REV. 8/2016) PAGE 6 1. SOLICITATION NUMBER (If any) 8a. FORMER FIRM NAME(S) (If any)8b. YEAR ESTABLISHED 9. EMPLOYEES BY DISCIPLINE Total (1) FIRM (2) BRANCH 1. Less than $100,000 2. $100,000 to less than $250,000 3. $250,000 to less than $500,000 4. $500,000 to less than $1 million 5. $1 million to less than $2 million 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) 7. NAME OF FIRM (If Block 2a is a Branch Office) 6a. POINT OF CONTACT NAME AND TITLE 6c. E-MAIL ADDRESS 8c. UNIQUE ENTITY IDENTIFIER a. Federal Work b. Non-Federal Work c. Total Work 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. b. DATE c. NAME AND TITLE a. Function Code a. Profile Code 6b. TELEPHONE NUMBER a. TYPE b. SMALL BUSINESS STATUS PROFESSIONAL SERVICES REVENUE INDEX NUMBER 6. $2 million to less than $5 million 7. $5 million to less than $10 million 8. $10 million to less than $25 million 9. $25 million to less than $50 million 10. $50 million or greater Other Employees 20-07-01 Saltz Michelson Architects, Inc. Fort Lauderdale Charles A. Michelson, AIA, ACHA, LEED AP, President 954.266.2700 Mark L. Saltz Architects, Inc. Mark L. Saltz, AIA, Architect 1980 1976 SMA@SaltzMichelson.com FL Charles A. Michelson, AIA, ACHA, LEED AP, President 08/18/2020 33312 1996 Corporation 94-585-1731 94-585-1731 94-585-1731 CBE 3501 Griffin Road 02 7 1 1 C10 5 E02 8 Administrative Commercial Bldg, Shopping Centers Educational Facilities Architect Community Facilities Field Houses, Gyms, Stadiums CADD Technician Computer Facilities Garages, Parking Decks Project Manager Interior Design Design-Build Hospital/Medical Facilities 06 7 6 C 11 6 F02 2 08 11 6 C13 3 G01 5 48 37 3 1 28 1 D04 7 H09 8 QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 53 August 14, 2020 2020-00620-07-01 QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 54 ARCHITECT – ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (If any) RFQ 20-07-01 PART II – GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (OR BRANCH OFFICE) NAME Miller Legg 3. YEAR ESTABLISHED 1965 4. DUNS NUMBER 038700035 2b. STREET 5747 N Andrews Way 5. OWNERSHIP a. TYPE Corporate 2c. CITY Fort Lauderdale 2d. STATE FL 2e. ZIP CODE 33309-2364 b. SMALL BUSINESS STATUS Yes 6a. POINT OF CONTACT NAME AND TITLE Michael Kroll, President 7. NAME OF FIRM (If block 2a is a branch office) 6b. TELEPHONE NUMBER (954) 628-3651 6c. E-MAIL ADDRESS mkroll@millerlegg.com 8a. FORMER FIRM NAME(S) (If any) 8b. YR. ESTABLISHED 8c. DUNS NUMBER 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) PROFESSIONAL SERVICES REVENUE INDEX NUMBER 1. Less than $100,000 2. $100,000 to less than $250,000 3. $250,000 to less than $500,000 4. $500,000 to less than $1 million 5. $1 million to less than $2 million 6. $2 million to less than $5 million 7. $5 million to less than $10 million 8. $10 million to less than $25 million 9. $25 million to less than $50 million 10. $50 million or greater a. Federal Work 4 b. Non-Federal Work 6 c. Total Work 6 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. a. SIGNATURE b. DATE 8/11/2020 c. NAME AND TITLE Michael Kroll, President AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 5/1/2004 STANDARD FORM 330 (1/2004) PAGE 6 10. PROFILE OF FIRM’S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Profile Code b. Experience c. Revenue Index Number (see below) C02 Cemeteries (Planning & Relocation) 5 C06 Churches; Chapels 2 C10 Commercial Building; (low rise); Shopping Centers 2 C14 Conservation and Resource Management 4 E01 Ecological & Archeological Investigations 4 E02 Educational Facilities; Classrooms 4 H07 Highways; Streets; Airfield Paving; Parking Lots 2 H09 Hospitals & Medical Facilities 3 H11 Housing (Residential, Multifamily, Apartments, Condominiums 6 I06 Irrigation; Drainage 2 L01 Laboratories; Medical Research Facilites 2 L03 Landscape Architecture 5 P04 Pipelines (Cross-country--Liquid & Gas) 2 P05 Planning (Community; Regional; Areawide & State) 3 P06 Planning (Site, Installation and Project) 3 R04 Recreational Facilities (Parks; Marinas; ect.) 4 S04 Sewage Collection, Treatment & Disposal 5 S13 Stormwater Handling & Facilities 5 S10 Surveying; Platting; Mapping; Flood Plain Studies 2 T03 Traffic & Transportation Engineering 2 U02 Urban Renewals; Community Development 4 W03 Water Supply; Treatment and Distribution 4 9. EMPLOYEES BY DISCIPLINE a. Function Code b. Discipline c. No. of Employees (1) FIRM (2) BRANCH 02 Administrative 11 10 07 Biologist 3 3 08 CADD Technician 5 5 12 Civil Engineers 11 9 14 Computer Programmer 1 1 16 Construction Manager 0 0 19 Ecologists 1 1 21 Electrical Engineers 0 0 23 Environmental Engineer 0 0 50 Environmental Risk Assessor 0 0 24 Environmental Scientist 2 1 29 GIS Specialist 0 0 39b Irrigation Designer 0 0 38 Land Surveyor 2 2 38a Survey Crew Members 6 2 39 Landscape Architects 4 3 39a Landscape Designers 6 6 47 Planners: Urban/Regional 1 1 51 Safety/Occupational Health 0 0 60 Transportation Engineers 0 0 Other Employees 1 0 Total 54 44 QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 55 ARCHITECT – ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (If any) RFQ 20-07-01 PART II – GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (OR BRANCH OFFICE) NAME Miller Legg 3. YEAR ESTABLISHED 2006 5. DUNS NUMBER 038700035 2b. STREET 7743 NW 48th Street, Suite 140 5. OWNERSHIP a. TYPE Corporate 2c. CITY Miami 2d. STATE FL 2e. ZIP CODE 33166-5407 b. SMALL BUSINESS STATUS Yes 6a. POINT OF CONTACT NAME AND TITLE Michael Kroll, President 7. NAME OF FIRM (If block 2a is a branch office) Miller Legg 6b. TELEPHONE NUMBER (954) 628-3651 6c. E-MAIL ADDRESS mkroll@millerlegg.com 8a. FORMER FIRM NAME(S) (If any) 8b. YR. ESTABLISHED 8c. DUNS NUMBER 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) PROFESSIONAL SERVICES REVENUE INDEX NUMBER 1. Less than $100,000 2. $100,000 to less than $250,000 3. $250,000 to less than $500,000 4. $500,000 to less than $1 million 5. $1 million to less than $2 million 6. $2 million to less than $5 million 7. $5 million to less than $10 million 8. $10 million to less than $25 million 9. $25 million to less than $50 million 10. $50 million or greater a. Federal Work 4 b. Non-Federal Work 6 c. Total Work 6 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. a. SIGNATURE c. DATE 8/11/2020 c. NAME AND TITLE Michael Kroll, President AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 5/1/2004 STANDARD FORM 330 (1/2004) PAGE 6 10. PROFILE OF FIRM’S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Profile Code b. Experience c. Revenue Index Number (see below) C02 Cemeteries (Planning & Relocation) 0 C06 Churches; Chapels 0 C10 Commercial Building; (low rise); Shopping Centers 0 C14 Conservation and Resource Management 0 E01 Ecological & Archeological Investigations 0 E02 Educational Facilities; Classrooms 4 H07 Highways; Streets; Airfield Paving; Parking Lots 3 H09 Hospitals & Medical Facilities 2 H11 Housing (Residential, Multifamily, Apartments, Condominiums 0 I06 Irrigation; Drainage 0 L01 Laboratories; Medical Research Facilites 0 L03 Landscape Architecture 0 P04 Pipelines (Cross-country--Liquid & Gas) 0 P05 Planning (Community; Regional; Areawide & State) 0 P06 Planning (Site, Installation and Project) 0 R04 Recreational Facilities (Parks; Marinas; ect.) 0 S04 Sewage Collection, Treatment & Disposal 0 S13 Stormwater Handling & Facilities 0 S10 Surveying; Platting; Mapping; Flood Plain Studies 6 T03 Traffic & Transportation Engineering 0 U02 Urban Renewals; Community Development 0 W03 Water Supply; Treatment and Distribution 0 9. EMPLOYEES BY DISCIPLINE a. Function Code b. Discipline c. No. of Employees (1) FIRM (2) BRANCH 02 Administrative 11 0 07 Biologist 3 0 08 CADD Technician 5 0 12 Civil Engineers 11 1 14 Computer Programmer 1 0 16 Construction Manager 0 0 19 Ecologists 1 0 21 Electrical Engineers 0 0 23 Environmental Engineer 0 0 50 Environmental Risk Assessor 0 0 24 Environmental Scientist 2 1 29 GIS Specialist 0 0 39b Irrigation Designer 0 0 38 Land Surveyor 2 0 38a Survey Crew Members 6 4 39 Landscape Architects 4 1 39a Landscape Designers 6 0 47 Planners: Urban/Regional 1 0 51 Safety/Occupational Health 0 0 60 Transportation Engineers 0 0 Other Employees 1 1 Total 54 8 QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 56 PART II - GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (or Branch Office) NAME R.A Kamm & Associates, Inc. dba Kamm Consulting. Inc. 3. YEAR ESTABLISHED 1994 4. UNIQUE ENTITY IDENTIFIER 2b. STREET 1407 W Newport Center Drive 5. OWNERSHIP a.TYPECorporation2c. CITY Deerfield Beach 2d. STATE FL 2e. ZIP CODE 33442 b. SMALL BUSINESS STATUS 6a. POINT OF CONTACT NAME AND TITLE Art Kamm, P.E.., CxA, LEED AP – Managing Principal and Chief Executive Officer 7. NAME OF FIRM (If Block 2a is a Branch Office) 6b. TELEPHONE NUMBER 954-949-2200 6c. E-MAIL ADDRESS Art@kammconsulting.com 8a. FORMER FIRM NAME(S) (If any)8b. YEAR ESTABLISHED 8c. UNIQUE ENTITY IDENTIFIER 1994 84-934-6762 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function Code b. Discipline c. Number of Employees a. Profile Code b. Experience c. Revenue Index Number(see below)(1) FIRM (2) BRANCH 42 Mechanical Engineers 3 A11 Auditoriums/Theaters 1 21 Electrical Engineers 2 1 P14 Public Safety/Fire Stations 2 Mechanical Designers 8 1 C10 Commercial Low Rise Shopping Centers 4 Plumbing Designers 5 1 C11 Community Facilities 3 08 Auto CADD 6 2 C13 Computer Facilities 2 02 Administrative 3 D07 Restaurants/Dining Halls/Clubs 2 Project Managers 5 2 E02 Education Facilities/Classrooms 3 Electrical Designers 8 1 F03 Fire Protection 3 G01 Parking Deck/Garage/Vehicle 3 H04 Heating, Ventilating, Air Conditioning 3 H06 High Rise Air Rights Type Buildings 2 H09 Hospital & Medical Facilities 1 H11 Housing 3 L01 Laboratories 1 L04 Libraries 2 L05 Lighting –Interior 5 L06 Lighting –Exterior 3 O01 Office Buildings/Industrial Parks 3 P08 Plumbing & Piping Design 5 R04 Recreational Facilities/Parks/Marinas 2 Other Employees S11 Sustainable Design (LEED)4 Total 38 7 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) PROFESSIONAL SERVICES REVENUE INDEX NUMBER 1. Less than $100,000 6.$2 million to less than $5 million 2.$100,000 to less than $250,000 7.$5 million to less than $10 million 3.$250,000 to less than $500,000 8.$10 million to less than $25 million 4.$500,000 to less than $1 million 9.$25 million to less than $50 million 5. $1 million to less than $2 million 10. $50 million or greater a. Federal Work b. Non-Federal Work c. Total Work 8 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. a.NAME AND TITLEArt Kamm, P.E., CxA, LEED AP STANDARD FORM 330 (REV. 8/2016) PAGE 6 1. SOLICITATION NUMBER (If any)ARCHITECT-ENGINEER QUALIFICATIONS a. SIGNATURE b. DATEb. DATE 19-26Q 84-934-6762 August 13, 2020 20-07-01 QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 57 [BEGIN PART 2] ARCHITECT – ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER PART II – GENERAL QUALIFICATIONS 2a. FIRM (OR BRANCH OFFICE) NAME Reliance Engineering Inc. 3. YEAR ESTABLISHED 1997 4. DUNS NUMBER 2b. STREET 10388 West State Road 84, Suite 112 5. OWNERSHIP a. TYPE Corporation 2c. CITY Davie 2d. STATE FL 2e. ZIP CODE 33324 b. SMALL BUSINESS STATUS SBE 6a. POINT OF CONTACT NAME AND TITLE Sankar Warier, P.E., Ph.D., President. 7. NAME OF FIRM (If block 2a is a branch office) 6b. TELEPHONE NUMBER 954-474-7578 6c. E-MAIL ADDRESS rwarier@gmail.com 8a. FORMER FIRM NAME(S) 8b. YR. ESTABLISHED 8c. DUNS NUMBER 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS PROFESSIONAL SERVICES REVENUE INDEX NUMBER 1. Less than $100,000 2. $100,000 to less than $250,000 3. $250,000 to less than $500,000 4. $500,000 to less than $1 million 5. $1 million to less than $2 million 6. $2 million to less than $5 million 7. $5 million to less than $10 million 8. $10 million to less than $25 million 9. $25 million to less than $50 million 10. $50 million or greater a. Federal Work 0 b. Non-Federal Work 100% (#2) c. Total Work 100% (#2) 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. a. SIGNATURE .Sankar Warier b. DATE 06-25--2020 c. NAME AND TITLE Sankar Warier, P.E., Ph.D., President. STANDARD FORM 330 10. PROFILE OF FIRM’S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Profile Code b. Experience c. Revenue Index Number 048 Hospitals: Freestanding Emergency Departments in Doral, Coral Way and West Kendall.nd Medical Facilities including Medi 2 Emergency Department Buildings In West Kendall, Coral Way and Doral. Cath Lab and other suite additions At the Broward General Medical Center And Memorial Hospital. 017 Shopping Centers - Commercial Buildings. 1 072 Office Buildings 1 029 Educational Facilities. 2 050 Student Housing. 2 106 Inspection Services. 1 9. EMPLOYEES BY DISCIPLINE a. Function Code b. Discipline c. No. of Employees (1) FIRM (2) BRANCH Structural Engineer 1 1 20-07-01 QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 58 6/6/2020 20-07-01 QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 59 20-07-01 QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 60 QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 61 Halsey Beshears, SecretaryRon DeSantis, Governor STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF ARCHITECTURE & INTERIOR DESIGN THE ARCHITECT HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 481, FLORIDA STATUTES SCHWARTZ, NORMAN IRA Do not alter this document in any form. 41 NW 110TH AVE LICENSE NUMBER: AR0015360 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. PLANTATION FL 33324 Always verify licenses online at MyFloridaLicense.com JONATHAN ZACHEM, SECRETARYRICK SCOTT, GOVERNOR STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF ARCHITECTURE & INTERIOR DESIGN THE ARCHITECT HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 481, FLORIDA STATUTES GUTIERREZ, MADAY Do not alter this document in any form. 10401 N W 19TH STREET LICENSE NUMBER: AR95167 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. PEMBROKE PINES FL 33026 Always verify licenses online at MyFloridaLicense.com Halsey Beshears, SecretaryRon DeSantis, Governor STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF ARCHITECTURE & INTERIOR DESIGN THE ARCHITECT HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 481, FLORIDA STATUTES MICHELSON, CHARLES A Do not alter this document in any form. 3501 GRIFFIN RD LICENSE NUMBER: AR0009976 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. FT LAUDERDALE FL 33312 Always verify licenses online at MyFloridaLicense.com Halsey Beshears, SecretaryRon DeSantis, Governor STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF ARCHITECTURE & INTERIOR DESIGN THE ARCHITECT FIRM HEREIN IS CERTIFIED UNDER THE PROVISIONS OF CHAPTER 481, FLORIDA STATUTES SALTZ MICHELSON ARCHITECTS Do not alter this document in any form. SALTZ MICHELSON ARCHITECTS, INC. LICENSE NUMBER: AA0002897 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. 3501 GRIFFIN RD FORT LAUDERDALE FL 33312 Always verify licenses online at MyFloridaLicense.com Saltz Michelson Architects, Inc. QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 62 Saltz Michelson Architects, Inc. LEED Certifications QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 63 JONATHAN ZACHEM, SECRETARYRICK SCOTT, GOVERNOR STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES HOLLAND, SUSAN CAROL Do not alter this document in any form. 1120 SE 3RD AVENUE LICENSE NUMBER: PE41831 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. FORT LAUDERDALE FL 33316 Always verify licenses online at MyFloridaLicense.com JONATHAN ZACHEM, SECRETARYRICK SCOTT, GOVERNOR STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF PROFESSIONAL ENGINEERS THE ENGINEERING BUSINESS HEREIN IS AUTHORIZED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES HOLLAND ENGINEERING INC Do not alter this document in any form. 1120 SE 3 AVENUE LICENSE NUMBER: CA7325 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. FORT LAUDERDALE FL 33316 Always verify licenses online at MyFloridaLicense.com Holland Engineering, Inc. Miller Legg & Associates, Inc. Landscape Architecture Civil Engineering QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 64 Miller Legg & Associates, Inc. Environmental Survey QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 65 Kamm Consulting, Inc. JONATHAN ZACHEM, SECRETARYRICK SCOTT, GOVERNOR STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES WARIER, SANKAR Do not alter this document in any form. 10388 WEST STATE ROAD 84, STE 112 LICENSE NUMBER: PE42369 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. DAVIE FL 33324 Always verify licenses online at MyFloridaLicense.com JONATHAN ZACHEM, SECRETARYRICK SCOTT, GOVERNOR STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF PROFESSIONAL ENGINEERS THE ENGINEERING BUSINESS HEREIN IS AUTHORIZED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES RELIANCE ENGINEERING, INC. Do not alter this document in any form. 10388 W. STATE ROAD 84 LICENSE NUMBER: CA7881 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. SUITE 112 DAVIE FL 33324 Always verify licenses online at MyFloridaLicense.com Reliance Engineering, Inc. MEP Engineering Structural Engineering QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 66 Halsey Beshears, SecretaryRon DeSantis, Governor STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF LANDSCAPE ARCHITECTURE THE LANDSCAPE ARCHITECT HEREIN HAS REGISTERED UNDER THE PROVISIONS OF CHAPTER 481, FLORIDA STATUTES BODKER, DAVE J Do not alter this document in any form. 801 NW 2ND AVE LICENSE NUMBER: LA0000999 EXPIRATION DATE: NOVEMBER 30, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. DELRAY BEACH FL 33444 Always verify licenses online at MyFloridaLicense.com Halsey Beshears, SecretaryRon DeSantis, Governor STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF LANDSCAPE ARCHITECTURE THE LANDSCAPE ARCHITECT BUSINESS HEREIN HAS REGISTERED UNDER THE PROVISIONS OF CHAPTER 481, FLORIDA STATUTES DAVE BODKER LANDSCAPE ARCHITECTURE/PLANNING INC Do not alter this document in any form. 601 NORTH CONGRESS AVENUE LICENSE NUMBER: LC26000260 EXPIRATION DATE: NOVEMBER 30, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. SUITE 105 - A DELRAY BEACH FL 33445 Always verify licenses online at MyFloridaLicense.com Halsey Beshears, SecretaryRon DeSantis, Governor STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BUILDING CODE ADMINISTRATORS & INSPECTOR THE STANDARD INSPECTOR HEREIN IS CERTIFIED UNDER THE PROVISIONS OF CHAPTER 468, FLORIDA STATUTES JETZKEWITZ, SVEN Do not alter this document in any form. 2851 W PROSPECT ROAD UNIT 903 LICENSE NUMBER: BN6643 EXPIRATION DATE: NOVEMBER 30, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. FORT LAUDERDALE FL 33309 Always verify licenses online at MyFloridaLicense.com BLDG Dave Bodker Landscape Architecture/Planning, Inc. Federal Engineering & Testing, Inc. Halsey Beshears, SecretaryRon DeSantis, Governor STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BUILDING CODE ADMINISTRATORS & INSPECTOR THE STANDARD INSPECTOR HEREIN IS CERTIFIED UNDER THE PROVISIONS OF CHAPTER 468, FLORIDA STATUTES LEBLANC, KEITH JOHN Do not alter this document in any form. 3370 NE 5 AVENUE LICENSE NUMBER: BN3373 EXPIRATION DATE: NOVEMBER 30, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. OAKLAND PARK FL 33334 Always verify licenses online at MyFloridaLicense.com BLDG QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 67 Financial Stability Please refer to SMA’s 2019 Financials on the following pages. Below is a summary of SMA’s 2017 and 2018 Full Financials as proof of financial stability and capability to fully comply with this contract’s term. Z&WͬZ>/η͗ dŝƚůĞ͗ ŐĞŶĐLJ͗ WD͗ ηŽĨZĞƐƉŽŶĚĞƌƐ͗ ƵĞĂƚĞ͗ /ŶŝƚŝĂůǀĂůƵƚĂŝŽŶ͗ ZĞƐƉŽŶĚĞƌEĂŵĞ͗'ĂůůŽƌĐŚŝƚĞĐƚƐΘĞǀĞůŽƉŵĞŶƚŽŶƐƵůƚĂŶƚƐ͕/ŶĐ͘ ŽŶĨŝĚĞŶƚŝĂůŝƚLJůĂŝŵ͗E WƵďůŝĐůLJdƌĂĚĞĚ͗E &ŝŶĂŶĐŝĂůƐWƌŽǀŝĚĞĚ ƵĚŝƚĞĚ͍ ZĞǀĞŶƵĞ EĞƚWƌŽĨŝƚͬ;>ŽƐƐͿ ƋƵŝƚLJ;Ϳ ƵƌƌĞŶƚƐƐĞƚƐ ;Ϳ ƵƌƌĞŶƚ >ŝĂďŝůŝƚŝĞƐ;>Ϳ dŽƚĂůƐƐĞƚƐ ;dͿ dŽƚĂů>ŝĂďŝůŝƚŝĞƐ ;d>Ϳ ĞďƚƚŽ ƋƵŝƚLJZĂƚŝŽ ;d>ͬͿ ϭ ƵƌƌĞŶƚ ZĂƚŝŽ ;ͬ>Ϳ Ϯ &zŶĚŝŶŐĞĐϯϭ͕ϮϬϭϴ /ŶĐŽŵĞ^ƚŵƚƐ E ϱ͕ϲϯϵ͕ϲϱϵϭ͕ϰϲϴ͕ϳϲϯϮ͕ϳϰϴ͕ϭϲϬϭ͕ϳϯϰ͕ϳϭϵϭϲϯ͕ϭϯϱϮ͕ϵϭϭ͕ϳϵϱϭϲϯ͕ϲϯϱϬ͘Ϭϲ ϭϬ͘ϲϯ &zŶĚŝŶŐĞĐϯϭ͕ϮϬϭϳ /ŶĐŽŵĞ^ƚŵƚƐ E ϰ͕ϯϭϵ͕ϬϮϰϭ͕ϭϴϭ͕ϲϳϵϮ͕Ϭϱϭ͕Ϭϭϵϭ͕ϵϲϭ͕ϴϮϰϳϴ͕ϱϱϰϮ͕ϭϰϰ͕ϯϰϬϵϯ͕ϯϮϭϬ͘Ϭϱ Ϯϰ͘ϵϳ ŽŵŵĞŶƚ͗ ZĞƐƉŽŶĚĞƌEĂŵĞ͗^ĂůƚnjDŝĐŚĞůƐŽŶƌĐŚŝƚĞĐƚƐ ŽŶĨŝĚĞŶƚŝĂůŝƚLJůĂŝŵ͗E WƵďůŝĐůLJdƌĂĚĞĚ͗E &ŝŶĂŶĐŝĂůƐWƌŽǀŝĚĞĚ ƵĚŝƚĞĚ͍ ZĞǀĞŶƵĞ EĞƚWƌŽĨŝƚͬ;>ŽƐƐͿ ƋƵŝƚLJ;Ϳ ƵƌƌĞŶƚƐƐĞƚƐ ;Ϳ ƵƌƌĞŶƚ >ŝĂďŝůŝƚŝĞƐ;>Ϳ dŽƚĂůƐƐĞƚƐ ;dͿ dŽƚĂů>ŝĂďŝůŝƚŝĞƐ ;d>Ϳ ĞďƚƚŽ ƋƵŝƚLJZĂƚŝŽ ;d>ͬͿ ϭ ƵƌƌĞŶƚ ZĂƚŝŽ ;ͬ>Ϳ Ϯ &zŶĚŝŶŐĞĐϯϭ͕ϮϬϭϴ &Ƶůů&ŝŶĂŶĐŝĂůƐ E ϲ͕Ϯϰϰ͕ϵϲϭϭ͕ϮϬϵ͕ϭϳϰϮ͕ϱϵϲ͕ϳϯϯϯ͕ϰϯϱ͕Ϯϰϰϴϵϲ͕ϴϲϬϯ͕ϰϵϯ͕ϱϵϯϴϵϲ͕ϴϲϬϬ͘ϯϱϯ͘ϴϯ &zŶĚŝŶŐĞĐϯϭ͕ϮϬϭϳ &Ƶůů&ŝŶĂŶĐŝĂůƐ E ϱ͕ϱϱϮ͕Ϯϰϯϵϯϭ͕ϲϳϮϭ͕ϲϳϳ͕ϱϱϵϮ͕ϬϮϭ͕ϴϱϲϰϬϰ͕ϬϯϵϮ͕Ϭϴϭ͕ϱϵϴϰϬϰ͕ϬϯϵϬ͘Ϯϰϱ͘ϬϬ ŽŵŵĞŶƚ͗ ZĞƐƉŽŶĚĞƌEĂŵĞ͗dŚĞDĂƌƚŝŶƌĐŚŝƚĞĐƚƵƌĂů'ƌŽƵƉ ŽŶĨŝĚĞŶƚŝĂůŝƚLJůĂŝŵ͗E WƵďůŝĐůLJdƌĂĚĞĚ͗E &ŝŶĂŶĐŝĂůƐWƌŽǀŝĚĞĚ ƵĚŝƚĞĚ͍ ZĞǀĞŶƵĞ EĞƚWƌŽĨŝƚͬ;>ŽƐƐͿ ƋƵŝƚLJ;Ϳ ƵƌƌĞŶƚƐƐĞƚƐ ;Ϳ ƵƌƌĞŶƚ >ŝĂďŝůŝƚŝĞƐ;>Ϳ dŽƚĂůƐƐĞƚƐ ;dͿ dŽƚĂů>ŝĂďŝůŝƚŝĞƐ ;d>Ϳ ĞďƚƚŽ ƋƵŝƚLJZĂƚŝŽ ;d>ͬͿ ϭ ƵƌƌĞŶƚ ZĂƚŝŽ ;ͬ>Ϳ Ϯ &zŶĚŝŶŐĞĐϯϭ͕ϮϬϭϴ dĂdžZĞƚƵƌŶƐ E ϱ͕ϮϬϭ͕ϯϯϴϯϴ͕ϴϲϳϰϲϳ͕ϭϲϴϰϰϰ͕Ϭϴϰϳϭ͕ϳϰϳϱϯϳ͕ϵϵϵϳϬ͕ϴϯϭϬ͘ϭϱϲ͘ϭϵ &zŶĚŝŶŐĞĐϯϭ͕ϮϬϭϳ dĂdžZĞƚƵƌŶƐ E ϱ͕ϭϴϬ͕ϰϴϳϳϳ͕ϮϵϮϰϴϱ͕ϯϭϯϰϳϮ͕ϳϵϯϴϬ͕ϯϬϱϱϳϬ͕ϲϬϱϴϱ͕ϮϵϮϬ͘ϭϴϱ͘ϴϵ ŽŵŵĞŶƚ͗ ZĞƐƉŽŶĚĞƌEĂŵĞ͗dŚĞdĂŵĂƌĂWĞĂĐŽĐŬŽŵƉĂŶLJƌĐŚŝƚĞĐƚƐ ŽŶĨŝĚĞŶƚŝĂůŝƚLJůĂŝŵ͗z WƵďůŝĐůLJdƌĂĚĞĚ͗E &ŝŶĂŶĐŝĂůƐWƌŽǀŝĚĞĚ ƵĚŝƚĞĚ͍ ZĞǀĞŶƵĞ EĞƚWƌŽĨŝƚͬ;>ŽƐƐͿ ƋƵŝƚLJ;Ϳ ƵƌƌĞŶƚƐƐĞƚƐ ;Ϳ ƵƌƌĞŶƚ >ŝĂďŝůŝƚŝĞƐ;>Ϳ dŽƚĂůƐƐĞƚƐ ;dͿ dŽƚĂů>ŝĂďŝůŝƚŝĞƐ ;d>Ϳ ĞďƚƚŽ ƋƵŝƚLJZĂƚŝŽ ;d>ͬͿ ϭ ƵƌƌĞŶƚ ZĂƚŝŽ ;ͬ>Ϳ Ϯ &zŶĚŝŶŐĞĐϯϭ͕ϮϬϭϳ dĂdžZĞƚƵƌŶƐ E ϭ͘ϳϲϮ͘ϬϮ &zŶĚŝŶŐĞĐϯϭ͕ϮϬϭϲ dĂdžZĞƚƵƌŶƐ E Ϯ͘ϮϳϬ͘ϱϰ ŽŵŵĞŶƚ͗ ZĞƐƉŽŶĚĞƌEĂŵĞ͗hƌďĂŶZŽďŽƚƐƐŽĐŝĂƚĞƐ ŽŶĨŝĚĞŶƚŝĂůŝƚLJůĂŝŵ͗E WƵďůŝĐůLJdƌĂĚĞĚ͗E &ŝŶĂŶĐŝĂůƐWƌŽǀŝĚĞĚ ƵĚŝƚĞĚ͍ ZĞǀĞŶƵĞ EĞƚWƌŽĨŝƚͬ;>ŽƐƐͿ ƋƵŝƚLJ;Ϳ ƵƌƌĞŶƚƐƐĞƚƐ ;Ϳ ƵƌƌĞŶƚ >ŝĂďŝůŝƚŝĞƐ;>Ϳ dŽƚĂůƐƐĞƚƐ ;dͿ dŽƚĂů>ŝĂďŝůŝƚŝĞƐ ;d>Ϳ ĞďƚƚŽ ƋƵŝƚLJZĂƚŝŽ ;d>ͬͿ ϭ ƵƌƌĞŶƚ ZĂƚŝŽ ;ͬ>Ϳ Ϯ &zŶĚŝŶŐĞĐϯϭ͕ϮϬϭϴ /ŶĐŽŵĞ^ƚŵƚΘĂůĂŶĐĞ ^ŚĞĞƚ E ϭ͕ϵϳϮ͕ϲϴϱϯϴ͕ϴϱϭϭϮϱ͕Ϭϲϲϭϯϰ͕ϲϰϮϭϲ͕Ϭϴϭϭϰϭ͕ϭϰϳϭϲ͕ϬϴϭϬ͘ϭϯϴ͘ϯϳ &zŶĚŝŶŐĞĐϯϭ͕ϮϬϭϳ /ŶĐŽŵĞ^ƚŵƚΘĂůĂŶĐĞ ^ŚĞĞƚ E Ϯ͕ϯϮϱ͕ϲϲϵϭϬϮ͕ϯϬϱϮϱϱ͕ϲϮϵϮϲϵ͕ϰϳϵϮϬ͕ϯϱϱϮϳϱ͕ϵϴϰϮϬ͕ϯϱϱϬ͘Ϭϴ ϭϯ͘Ϯϰ ŽŵŵĞŶƚ͗ EŽƚĞƐ͗ ϭdŚĞĞďƚƚŽƋƵŝƚLJZĂƚŝŽŝƐĂŵĞĂƐƵƌĞŽĨĂĐŽŵƉĂŶLJΖƐĨŝŶĂŶĐŝĂůůĞǀĞƌĂŐĞĐĂůĐƵůĂƚĞĚďLJĚŝǀŝĚŝŶŐŝƚƐƚŽƚĂůůŝĂďŝůŝƚŝĞƐďLJƐƚŽĐŬŚŽůĚĞƌƐΖĞƋƵŝƚLJ͘/ƚŝŶĚŝĐĂƚĞƐƚŚĞƉƌŽƉŽƌƚŝŽŶŽ ĞƋƵŝƚLJĂŶĚĚĞďƚƚŚĞĐŽŵƉĂŶLJŝƐƵƐŝŶŐƚŽĨŝŶĂŶĐĞŝƚƐĂƐƐĞƚƐ͘ŚŝŐŚĚĞďƚͬĞƋƵŝƚLJƌĂƚŝŽŐĞŶĞƌĂůůLJŵĞĂŶƐƚŚĂƚĂĐŽŵƉĂŶLJŚĂƐďĞĞŶĂŐŐƌĞƐƐŝǀĞŝŶĨŝŶĂŶĐŝŶŐŝƚƐŐƌŽǁƚŚǁŝƚ ĚĞďƚ͘ ϮdŚĞƵƌƌĞŶƚZĂƚŝŽŝƐĂůŝƋƵŝĚŝƚLJƌĂƚŝŽƚŚĂƚŵĞĂƐƵƌĞƐĂĐŽŵƉĂŶLJΖƐĂďŝůŝƚLJƚŽƉĂLJƐŚŽƌƚͲƚĞƌŵŽďůŝŐĂƚŝŽŶƐĂŶĚŝƐĐĂůĐƵůĂƚĞĚďLJĚŝǀŝĚŝŶŐĐƵƌƌĞŶƚĂƐƐĞƚƐďLJĐƵƌƌĞŶƚůŝĂďŝůŝƚŝĞƐ dŚĞŚŝŐŚĞƌƚŚĞĐƵƌƌĞŶƚƌĂƚŝŽ͕ƚŚĞŵŽƌĞĐĂƉĂďůĞƚŚĞĐŽŵƉĂŶLJŝƐŽĨƉĂLJŝŶŐŝƚƐŽďůŝŐĂƚŝŽŶƐ͘ƌĂƚŝŽƵŶĚĞƌϭ͘ϬƐƵŐŐĞƐƚƐƚŚĂƚƚŚĞĐŽŵƉĂŶLJǁŽƵůĚďĞƵŶĂďůĞƚŽƉĂLJŽĨĨŝƚ ŽďůŝŐĂƚŝŽŶƐŝĨƚŚĞLJĐĂŵĞĚƵĞĂƚƚŚĂƚƉŽŝŶƚ͘ d KE&/Ed/> WEϮϭϭϴϯϵϮWϭ ĞƐŝŐŶ^ĞƌǀŝĐĞƐĨŽƌdƌĂĚĞǁŝŶĚƐWĂƌŬEŽƌƚŚ ,ŝŐŚǁĂLJŽŶƐƚƌƵĐƚŝŽŶĂŶĚŶŐŝŶĞĞƌŝŶŐŝǀŝƐŝŽŶ DĞŚƌĚĂĚΗDŝŬĞΗ&ĂLJLJĂnj ϱ ϳͬϯϭͬϮϬϭϵ QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 68 QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 69 QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 70 QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 71 QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 72 QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 73 QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 74 QUALIFICATION INFO & ASSIGNED PERSONNELE. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 75 Performance Records Prime Vendor Dashboard - SALTZ MICHELSON ARCHITECTS INC Finish Proj/Contract/Agreement/WA Legend: Proj Nbr: = Project Number FC Nbr: = Fixed Contract Number OE Nbr: = Open End Contract Number WA Nbr: = Work Authorization Number Export To Excel Final/Complete/Renewal Vendor Performance Evaluations - Past 5 Years Proj/Contract/Agreement/WA Using Div Evaluation Type Locked Dt Future Score Go Proj Nbr: 100635 (CMD 7920-2009 -0) - OE Nbr: 200511180CM1 - WA Nbr: 31 CONSTRUCTION MANAGEMENT DIVISION Completed Consultant Evaluation 9/14/2016 YES 3.75 View Docs (0) OE Nbr: R0832006R1 - WA Nbr: 015CMD CONSTRUCTION MANAGEMENT DIVISION Completed Consultant Evaluation 6/13/2016 YES 4.21 View Docs (0) Proj Nbr: CMD 8160-2015-00 - OE Nbr: R0832006R1 - WA Nbr: 016CMD CONSTRUCTION MANAGEMENT DIVISION Completed Consultant Evaluation 6/9/2016 YES 3.63 View Docs (0) Proj Nbr: CMD 8160-2015-00 - OE Nbr: R0832006R1 - WA Nbr: 019CMD CONSTRUCTION MANAGEMENT DIVISION Completed Consultant Evaluation 6/9/2016 YES 3.86 View Docs (0) OE Nbr: R0832006R1 CONSTRUCTION MANAGEMENT DIVISION Completed Consultant Evaluation 5/18/2016 YES 4.21 View Docs (0) Proj Nbr: CMD-2600-2008-00 - FC Nbr: R0754608R1 CONSTRUCTION MANAGEMENT DIVISION Final Consultant Evaluation 4/5/2016 YES 4.98 View Docs (0) OE Nbr: R0832006R1 - WA Nbr: 010FMD FACILITIES MANAGEMENT Completed Consultant Evaluation 6/1/2015 YES 4.20 View Docs (0) Proj Nbr: CMD 5227-2011-00 - FC Nbr: 5227CONS CONSTRUCTION MANAGEMENT DIVISION Final Consultant Evaluation 5/22/2015 YES 3.80 View Docs (0) Proj Nbr: CMD 5227-2011-00 - OE Nbr: 200511180CM1 - WA Nbr: 01 CONSTRUCTION MANAGEMENT DIVISION Completed Consultant Evaluation 5/7/2015 YES 3.80 View Docs (0) OE Nbr: R0832006R1 CONSTRUCTION MANAGEMENT DIVISION Renewal Consultant Evaluation 02/28/2014 - 02/28/2015 4/1/2015 YES 4.50 View Docs (0) Proj Nbr: CMD 5210-2011-00 - OE Nbr: R0832006R1 - WA Nbr: 018CMD CONSTRUCTION MANAGEMENT DIVISION Completed Consultant Evaluation 1/14/2015 YES 4.29 View Docs (0) Page 1 of 1 9/10/2019https://mrapps6/contractscentral/PrimeVendorDashboard_public.aspx As proof of performance records, please see below SMA’s Performance Evaluation score sheet from our Continuous Contract with Broward County. Under this contract (27 years), SMA has been involved with projects with varying scopes, sizes and costs. The maximum score is 5.0 – our average is 4.08. Prime Vendor Dashboard - SALTZ MICHELSON ARCHITECTS INC Finish Proj/Contract/Agreement/WA Legend: Proj Nbr: = Project Number FC Nbr: = Fixed Contract Number OE Nbr: = Open End Contract Number WA Nbr: = Work Authorization Number Export To Excel Final/Complete/Renewal Vendor Performance Evaluations - Past 5 Years Proj/Contract/Agreement/WA Using Div Evaluation Type Locked Dt Future Score Go Proj Nbr: 100635 (CMD 7920-2009 -0) - OE Nbr: 200511180CM1 - WA Nbr: 31 CONSTRUCTION MANAGEMENT DIVISION Completed Consultant Evaluation 9/14/2016 YES 3.75 View Docs (0) OE Nbr: R0832006R1 - WA Nbr: 015CMD CONSTRUCTION MANAGEMENT DIVISION Completed Consultant Evaluation 6/13/2016 YES 4.21 View Docs (0) Proj Nbr: CMD 8160-2015-00 - OE Nbr: R0832006R1 - WA Nbr: 016CMD CONSTRUCTION MANAGEMENT DIVISION Completed Consultant Evaluation 6/9/2016 YES 3.63 View Docs (0) Proj Nbr: CMD 8160-2015-00 - OE Nbr: R0832006R1 - WA Nbr: 019CMD CONSTRUCTION MANAGEMENT DIVISION Completed Consultant Evaluation 6/9/2016 YES 3.86 View Docs (0) OE Nbr: R0832006R1 CONSTRUCTION MANAGEMENT DIVISION Completed Consultant Evaluation 5/18/2016 YES 4.21 View Docs (0) Proj Nbr: CMD-2600-2008-00 - FC Nbr: R0754608R1 CONSTRUCTION MANAGEMENT DIVISION Final Consultant Evaluation 4/5/2016 YES 4.98 View Docs (0) OE Nbr: R0832006R1 - WA Nbr: 010FMD FACILITIES MANAGEMENT Completed Consultant Evaluation 6/1/2015 YES 4.20 View Docs (0) Proj Nbr: CMD 5227-2011-00 - FC Nbr: 5227CONS CONSTRUCTION MANAGEMENT DIVISION Final Consultant Evaluation 5/22/2015 YES 3.80 View Docs (0) Proj Nbr: CMD 5227-2011-00 - OE Nbr: 200511180CM1 - WA Nbr: 01 CONSTRUCTION MANAGEMENT DIVISION Completed Consultant Evaluation 5/7/2015 YES 3.80 View Docs (0) OE Nbr: R0832006R1 CONSTRUCTION MANAGEMENT DIVISION Renewal Consultant Evaluation 02/28/2014 - 02/28/2015 4/1/2015 YES 4.50 View Docs (0) Proj Nbr: CMD 5210-2011-00 - OE Nbr: R0832006R1 - WA Nbr: 018CMD CONSTRUCTION MANAGEMENT DIVISION Completed Consultant Evaluation 1/14/2015 YES 4.29 View Docs (0) Page 1 of 1 9/10/2019https://mrapps6/contractscentral/PrimeVendorDashboard_public.aspx FIRM REFERENCES & SIMILAR WORK COMPLETED F. FIRM REFERENCES & SIMILAR WORK COMPLETEDF. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 77 A. Number of Years of Experience of the Firm in the Specified Work Areas 44 B. Examples of Similar Services/References Please refer to the following pages for specific examples with applicable reference information. C. Qualification Statement Since our inception, SMA has accumulated an extensive list of open-ended contracts with multiple government and other public agencies — as such, we understand the unique needs of these different and diverse types of projects and have the experience to respond. From planned capital improvements, modernization projects and design criteria to reroofs, ADA upgrades, problem solving, leak solving problems, etc. to remediation and repair after storms, you need a firm with the capability to respond. Having seven registered architects locally available, we have the staffing and over 200 years of accumulated architectural experience to offer the City of Sunny Isles Beach. Public contracts are our area of expertise - we have an extensive list of continuing services contracts with multiple public agencies, including with Broward County (27 years), Memorial Healthcare System (25 consecutive years), Miami-Dade County Public Schools (11 schools), and numerous other public entities; as such, we understand the unique needs of these types of projects. D. Resumes Per Addendum 1, Question 5, resumes of all proposed team members are included in the SF 330 Form in Section E – Project Approach and Understanding. E. Past 5 Years of Executed Agreements with Similar Scope made between Firm and local Municipalities Please refer to the contracts/projects on the following pages. Per Addendum 1, contract copies are not needed. F. Organizational Chart Please refer to the Organizational Chart included in the SF 330 Form in Section E – Project Approach and Understanding. FIRM REFERENCES & SIMILAR WORK COMPLETEDF. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 78 Saltz Michelson Architects -Charles Michelson -Sheff Devier -Mary Farlander -Maday Gutierrez -Frida Dunayer -Juan Pablo Garcia Holland Engineering -Susan Holland -Ayitey Aryee Reliance Engineering -Sankar Warier Kamm Consulting -Art Kamm -Lon Carter -Mircea Pella Federal Engineering & Testing -Keith LeBlanc PE -Sven Jetzkewitz Under this contract (27 years), SMA has been involved with projects with varying scopes, sizes and costs. Recent projects include the Convention Center design criteria, electric bus charging infrastructure, office renovations, Judicial Complex, Judges Bench, Main Library Learning Lab, transit support building, reports and studies, among others. Client Reference: Broward County Mr. Jeff Thompson, Assistant Director T: (954) 357-8460 | F: (954) 201-6976 | E : jthompson@broward.org Total Dollar Value: ≤ $2,000,000 Contract Duration: 27 Years (1993 - 1997 | 2001 - 2004 | 2006 - 2009 | 2011 - 2016 | 2016 - Present) Current/Past Firm: Current Firm Broward County Continuing Services Contract (27 Years) Broward County, Florida RELEVANCY Open-Ended Contract Government Agency Contract Longevity Essential Services Facilities Similar Size/Type Projects Past Five Years Same Team Members Convention Center Design Criteria Electric Bus Charging Infrastructure Transit Support Facility PARTICIPATING PERSONNEL FIRM REFERENCES & SIMILAR WORK COMPLETEDF. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 79 Saltz Michelson Architects -Charles Michelson -Sheff Devier -Mary Farlander -Maday Gutierrez -Frida Dunayer -Juan Pablo Garcia Holland Engineering -Susan Holland -Ayitey Aryee Kamm Consulting -Art Kamm -Lon Carter -Mircea Pella Memorial Regional Hospital Hurricane HardeningCancer Center Urgent Care Under this open-ended contract, we have been the architects for numerous projects within its six hospitals and other medical facilities. Projects have included hurricane hardening, hospital LEED Gold certification, offices, cancer centers, urgent care centers, women's centers, rehabilitation facilities, parking garages, medical office buildings, surgery centers, facade renovations, doctors' offices, and many more. Client Reference: Memorial Healthcare System Mr. Joseph G. Alcure, Jr., Former Director of Construction & Design (Retired) T: (954) 347-6555 | E : jalcurejr@aol.com Total Dollar Value: ≤ $28,000,000 Contract Duration: 25 Consecutive Years (1995 - Present) Current/Past Firm: Current Firm Memorial Healthcare System Continuing Services Contract (25 Years) Broward County, Florida RELEVANCY Open-Ended Contract Public Agency Contract Longevity Essential Services Facilities Similar Size/Type Projects Past Five Years Same Team Members PARTICIPATING PERSONNEL FIRM REFERENCES & SIMILAR WORK COMPLETEDF. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 80 Under the firm’s open-ended, design criteria documents for two park projects and a building expansion/shooting range for the Police Department. Park elements include a new building, rehab tennis courts and pool, and new fencing, pavilion, and children's splash pad. The new 5,000 SF PD building includes gun range, scenario rooms, offices, dining room, computer room, classroom, and support spaces. Client: City of Lauderhill Mr. Scott Newton, Assistant Director Parks T: (954) 730-3084 | F: (954) 730-4223 | E : snewton@lauderhill-fl.gov Total Dollar Value: Wolk Park: $56,000 (Design) | Police: $128,000 (Design) Contract Duration: Wolk Park: 03/2017 - 06/2019 | Police: 08/2017 - 11/2017 Current/Past Firm: Current Firm Wolk Park | Maye Jenkins Park | Police Department Building Expansion/Shooting Range City of Lauderhill Continuing Services Contract Lauderhill, Florida RELEVANCY Open-Ended Contract Government Agency Similar Size/Type Projects Past Five Years Same Team Members Maye Jenkins Park Police SubstationPolice Department Saltz Michelson Architects -Charles Michelson -Sheff Devier -Norman Schwartz -Frida Dunayer -Juan Pablo Garcia Holland Engineering -Susan Holland -Ayitey Aryee Kamm Consulting -Art Kamm -Lon Carter -Mircea Pella PARTICIPATING PERSONNEL Wolk Park FIRM REFERENCES & SIMILAR WORK COMPLETEDF. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 81 Saltz Michelson Architects -Charles Michelson -Sheff Devier -Mary Farlander -Frida Dunayer Holland Engineering -Susan Holland -Ayitey Aryee Kamm Consulting -Art Kamm -Lon Carter -Mircea Pella Renovation of approximately 25,000 SF of enclosed space on three stories. Work included demolition of existing interiors, construction of new offices and classrooms, renovated restrooms, new impact exterior windows and doors, new HVAC system, new electrical distribution and a new fire sprinkler system. In 2018, this project achieved Green Globes certification. Client: Broward College Ms. Deborah Czubkowski, District Director of Design & Construction T: (954) 201-6900 | E: dczubkow@broward.edu Total Dollar Value: Initial: $5,300,000 | Final: $5,300,000 Contract Duration: 02/2016 - 08/2016 (project was fast-tracked for the incoming students) Current/Past Firm: Current Firm Broward College Building 47 Renovations Broward College Continuing Services Contract (23 Years) Cypress Creek, Florida RELEVANCY Open-Ended Contract Client Longevity Green Globes Certification Public Agency Similar Size/Type Project Fast-tracked Past Five Years Same Team Members Before After PARTICIPATING PERSONNEL FIRM REFERENCES & SIMILAR WORK COMPLETEDF. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 82 Description: Complete roof replacement, curtain wall (building envelope) replacement and emergency back-up A/C system for a 33,000 SF State run tv/radio station. New glazing storefront and window systems along select areas of the east, north and west sides of the building were removed and reinstalled. The work was completed in phases so the facility could remain in operation during construction. Client: State of Florida Department of Management Services Ms. Elvie Rubio, Senior Projects Architect T: (850) 487-0796 | F: (904) 359-6281 | E: Elvie.Rubio@dms.myflorida.com Total Dollar Value: Initial: $1,464,579 | Final: $1,464,579 Contract Duration: 04/2015 - 10/2015 (no delays) Current/Past Firm: Current Firm WXEL-TV/PBS Studio Reglazing & Reroofing Florida Department of Management Services Continuing Services Contract Boynton Beach, Florida Existing Roof New Roof Reglazing RELEVANCY Open-Ended Contract Government Agency Similar Type Project Past Five Years Same Team Members Saltz Michelson Architects -Charles Michelson -Sheff Devier -Norman Schwartz PARTICIPATING PERSONNEL FIRM REFERENCES & SIMILAR WORK COMPLETEDF. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 83 Renovation of 15 park restroom buildings at various parks throughout the City. Scope included complete internal demo and reinstallation of new fixtures, partitions, floor and wall tile surfaces, and restroom accessories. The project was on schedule and within budget – SMA worked and coordinated with the City to meet changing schedules to accommodate sport and event planning. Client: City of Weston, Mr. Karl C. Thompson, PE, Director of Public Works T: (954) 385-2600 | E: kthompson@westonfl.org Total Dollar Value: Initial: $1,684,50 | Final: $1,684,50 (Project was within budget, and GC returned some (contingency) monies back to the City that was unused) Contract Duration: 05/2015 - 09/2016 (On schedule - SMA worked and coordinated with City to meet schedule changes to accommodate sport and event planning) Current/Past Firm: Current Firm Park Restroom Building Renovations (15 Locations) City of Weston Continuing Services Contract Weston, Florida RELEVANCY Open-Ended Contract Government Agency Similar Size/Type Project Past Five Years Same Team Members Saltz Michelson Architects -Charles Michelson -Sheff Devier -Norman Schwartz -Frida Dunayer - Kamm Consulting -Art Kamm -Lon Carter -Mircea Pella PARTICIPATING PERSONNEL FIRM REFERENCES & SIMILAR WORK COMPLETEDF. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 84 Saltz Michelson Architects -Charles Michelson -Norman Schwartz -Maday Gutierrez -Frida Dunayer - Miller Legg -Karen Lynch (Meadowlane) Original Shenandoah Middle School (1940s) Under the firm’s open-ended contract, SMA investigated the historical relevance of Shenandoah Middle School and worked with the community to preserve it. SMA also generated construction documents and coordinated with consultants to replace/modify HVAC, electrical, plumbing, ADA compliance, roofing upgrade, site drainage, misc. finishes, new replacement store front window system for all classrooms, PA system replacement, railings and light fixture replacements, and repainting of entire campus. Client: Miami-Dade County Public Schools Ms. Bianca Calzadilla, School Principal T: (305) 856-8282 | E: BCalzadilla@dadeschool.net Total Dollar Value: Initial: $4,966,00 | Final: $4,972,144 (Project was within budget - MDCPS/Owner has requested additional work scope) Contract Duration: 04/2015 - 05/2017 (On schedule) Current/Past Firm: Current Firm Shenandoah Middle School (GOB Program) Miami-Dade County Public Schools Continuing Services Contract Miami, Florida RELEVANCY Open-Ended Contract Miami-Dade County Public Agency Similar Size/Type Project Past Five Years Same Team Members PARTICIPATING PERSONNEL FIRM REFERENCES & SIMILAR WORK COMPLETEDF. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 85 Wind mitigation and renovation of Broward County's flagship library building and covered pedestrian bridge to current Florida Building Code and FM Global Standards including replacement of all exterior glazed openings with impact resistant glass and frames; replacement of all exterior architectural metal and trims associated with the exterior glazing system and building envelope; replacement of exterior doors (including door hardware), frames, louvers and other exterior openings with impact rated assemblies; and replacement of all penetrations and fixtures on the exterior envelope of the building including glass railings. Client: Broward County Mr. Juan Catasús, Construction Project Management Supervisor T: (954) 357-6177 | E: jcatasus@broward.org Total Dollar Value: Initial: $10,276,88 | Final: $10,040,723 Contract Duration: 05/2010 - 10/2015 (additional time due to unforeseen conditions and replacement of County-selected contractor) Current/Past Firm: Current Firm Broward County Main Library Wind Mitigation Fort Lauderdale, Florida RELEVANCY Complex Project Government Agency Essential Services Facility Similar Type Project Past Five Years Same Team Members Progress Photo Saltz Michelson Architects -Charles Michelson -Sheff Devier Dave Bodker Landscape Architecture/Planning -Dave Bodker PARTICIPATING PERSONNEL FIRM REFERENCES & SIMILAR WORK COMPLETEDF. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 86 Full A/E services including CA for a new ±25,000 square foot, three-story Emergency Operations / Code Services / Information Technologies Services Building. Offices for Building Code, Zoning Code, Fire Code, Code Enforcement and Records Storage are on the first floor, EOC, kitchen facilities, IT Offices, and multi-purpose space on the second, and sleeping quarters and support spaces on the third. When project was complete, the contractor gave back ($139,987.35) to the City. Client: City of Weston Mr. Darrel L. Thomas, Assistant City Manager/CFO T: (954) 385-2000 | F: (954) 385-2010 | E: dthomas@westonfl.org Total Dollar Value: Initial: $7,014,350 | Final: $7,398,945 (bidding occurred during a more volatile bidding climate resulting in a 5% increase over the estimate) Contract Duration: 05/2014 - 09/2015 Current/Past Firm: Current Firm City of Weston Emergency Operations Center Weston, Florida RELEVANCY Complex Project Government Agency Essential Services Facility Similar Type Project Past Five Years Same Team Members Saltz Michelson Architects -Charles Michelson -Sheff Devier -Frida Dunayer PARTICIPATING PERSONNEL FIRM REFERENCES & SIMILAR WORK COMPLETEDF. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 87 Site Entitlements, Program Verifications, Full Architectural design, CA, Warranty and LEED AP (Gold Certified)services for a new 51,419 SF, two-story recovery center with 50-bed detoxification unit, outpatient counseling services, medical exam spaces, and other spaces for related functions. Client: Broward County Mr. Stephen Greco, Expansion Project Administrator T: (954) 357-8533 | E: sgreco@broward.org Total Dollar Value: Initial: $16,993,642 | Final: $18,798,697 (Added Scope) Contract Duration: 12/2012 - 08/2018 (Additional time for rain delays, added scope and contractor's issue with obtaining final inspection approvals from the Building Department which caused considerable delays.) Current/Past Firm: Current Firm Broward County Addiction Recovery Center (BARC) Fort Lauderdale, Florida RELEVANCY Government Agency Essential Services Facility Similar Type Project LEED Gold Certification Past Five Years Same Team Members Saltz Michelson Architects -Charles Michelson -Sheff Devier -Maday Gutierrez -Frida Dunayer PARTICIPATING PERSONNEL CORPORATE STANDING AND AUTHORIZED SIGNATORY G. CORPORATE STANDING & AUTHORIZED SIGNATORYG. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 89 State of Florida Department of State I certify from the records of this office that SALTZ MICHELSON ARCHITECTS,INC.is a corporation organized under the laws of the State of Florida,filed on November 7, 1996. The document number of this corporation is P96000091528. I further certify that said corporation has paid all fees due this office through December 31, 2020,that its most recent annual report/uniform business report was filed on February 26, 2020,and that its status is active. I further certify that said corporation has not filed Articles of Dissolution. Given under my hand and the Great Seal of the State of Florida at Tallahassee,the Capital, this the Twenty-sixth day of February, 2020 Tracking Number: 9351935841CC To authenticate this certificate,visit the following site,enter this number, and then follow the instructions displayed. https://services.sunbiz.org/Filings/CertificateOfStatus/CertificateAuthentication CORPORATE STANDING & AUTHORIZED SIGNATORYG. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 90 August 18, 2020 City Clerk Sunny Isles Beach Government Center 18070 Collins Avenue Sunny Isles Beach, FL 33160 RE: Authorized Signatories for the Firm | RFQ No. 20-07-01 Dear Members of the Selection Committee: The below team member, Charles A. Michelson, AIA, ACHA, LEED AP, President of the Saltz Michelson Architects, is the authorized Signatory for the firm. • Charles A. Michelson, AIA, ACHA, LEED AP, President Natalia Castro, COO, Secretary FORMS & ATTACHMENTS H. City of Sunny Isles Beach |Request for Qualifications No. 20-07-01 33 D E L I V E R TO : City of Sunny Isles Beach City Clerk 18070 Collins Avenue Sunny Isles Beach, FL 33160 REQUEST FOR QUALIFICATIONS SECTION 6 RESPONDENT SUBMITTAL FORMS OPENING: 2:30 P.M. Tuesday, August 11, 2020 NOTE:City of Sunny Isles Beach is exempt from all taxes (Federal, State, and Local). Tax Exemption Certificate furnished upon request. Issued by:Purchasing Agent Genesis Cuevas Date Issued: Wednesday, July 8, 2020 This Qualification Submittal Consists of all required forms, including SF330, Questionnaires, Acknowledgements and Affidavits Submissions are subject to the Terms and Conditions of this Request for Qualifications and the accompanying Submittal. Such other contract provisions, specifications, drawings or other data as are attached or incorporated by reference in the Submittal, will be received at the office of the City Clerk at the address shown above until the above stated time and date, and at that time, publicly opened for furnishing services described in the accompanying Submittal Requirement. RFQ No.20-07-01 Continuing Contract for Professional Services CCNA F i r m N a m e ________________________________________C o m m o d i t y C o d e (s ): R E TU R N O N E O R I G I N A L A N D F O U R C O P I E S O F Q U A L I F I C A TI O N S U B M I TT A L P A G E S A N D A F F I D A V I TS FAILURE TO SIGN PAGE 38 OF SECTION 6 QUALIFICATION SUBMITTAL WILL RENDER YOUR SUBMISSION NON-RESPONSIVE Saltz Michelson Architects, Inc.018-906-00 City of Sunny Isles Beach |Request for Qualifications No. 20-07-01 34 6.1 ACKNOWLEDGEMENT FORM NAME OF COMPANY: ___________________________________________ (Name of company submitting RFQ) CHECK CATEGORY (CATEGORIES) YOU ARE APPLYING FOR: 1- ARCHITECTS __ 2- CIVIL ENGINEERS__ 3- ELECTRICAL ENGINEERS___ 4- SURVEYORS AND MAPPING__ 5- LEAK DETECTION STUDIES__ 6- MECHANICAL, HVAC & PLUMBING ENGINEERS___ 7 - GEOTECHNICAL___ 8 – STRUCUTRAL ENGINEERS___ 9 – ENVIRONMENTAL ENGINEERS____ 10. CONSTRUCTION ENGINEERING AND INSPECTION (CEI) SERVICES____ Saltz Michelson Architects, Inc. City of Sunny Isles Beach |Request for Qualifications No. 20-07-01 35 REQUIRED FORMS PRIME FIRM Role Name of Individual Assigned to Project Number of Years’ Experience Education, Degree Principle-in-Charge: Project Manager Asst. Project Manager Other Key Member Other Key Member REFERENCES Name Firm Providing Reference Phone # Email Address Charles A. Michelson, AIA, ACHA, LEED AP 40 University of Miami Master of Urban & Regional Planning, 1981 B. Architecture, 1979 Virginia Polytechnica Institute and State University, Blacksburg, VA M. Arch, 1991 Florida A and M University Tallahassee, FL, BS. Arch, 1989 University of Miami, Miami, FL Bachelor of Architecture, 1999 Virginia Polytechnic Institute & State University, Bachelor of Architecture, 1975 Ricardo Palma University Lima, Peru M. Arch and Urbanism, 1983 Sheff L. Devier, AIA, Senior PM/Oversight 29Norman I. Schwartz, AIA, LEED GA 21Maday Gutierrez, RA 45 Frida Dunayer, Interiors Mr. Jeff Thompson, Assistant Director Mr. Joseph G. Alcure, Jr., Former Dir. Construction Ms. Elvie Rubio, Senior Projects Architect Ms. Deborah Czubkowski, Dist. Dir. Design/Construction Mr. Scott Newton, Assistant Director Parks Broward County Memorial Healthcare System Florida Department of Management Services Broward College City of Lauderhill (954) 357-8460 (954) 347-6555 (850) 487-0796 (954) 201-6900 (954) 730-3084 jthompson@broward.org jalcurejr@aol.com Elvie.Rubio@dms. myflorida.com dczubkow@broward.edu snewton@lauderhill-fl.gov 37 City of Sunny Isles Beach |Request for Qualifications No. 20-07-01 36 ACKNOWLEDGEMENT OF ADDENDA INSTRUCTIONS: COMPLETE PART I OR PART II, WHICHEVER APPLIES PART I: LIST BELOW ARE THE DATES OF ISSUE FOR EACH ADDENDUM RECEIVED IN CONNECTION WITH THIS RFQ Addendum #1, Dated Addendum #2, Dated Addendum #3, Dated Addendum #4, Dated Addendum #5, Dated Addendum #6, Dated Addendum #7, Dated Addendum #8, Dated PART II: NO ADDENDUM WAS RECEIVED IN CONNECTION WITH THIS RFQ FIRM NAME: AUTHORIZED SIGNATURE: DATE: TITLE OF OFFICER: July 17, 2020 July 28, 2020 August 3, 2020 August 7, 2020 Saltz Michelson Architects, Inc. President 08/18/2020 City of Sunny Isles Beach |Request for Qualifications No. 20-07-01 37 RESPONDENT SUBMITTAL FORM RFQ 20-07-01 Continuing Professional Consulting Services (CCNA) The undersigned Firm proposes and agrees, if this submission is accepted, to enter into an agreement with the City of Sunny Isles Beach to perform and furnish all Services as specified or indicated in the Contract Documents. The Firm accepts all of the terms and conditions of this Request for Qualifications. This Bid will remain subject to acceptance for 90 days after the day of Bid opening. The Firms agrees to sign and submit the Agreement and other documents as required by the Bidding Requirements within ten days after the date of the City’s Notice of Award. In submitting this response, the Firm represents, as more fully set forth in the Agreement, that: The Firm has familiarized himself/herself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Law and Regulations that in any manner may affect cost, progress, performance, or furnishing of the Work. The Firm has studied carefully all reports and drawings of subsurface conditions and drawings of physical conditions. The Firm has given the City written notice of all conflicts, errors, discrepancies that it has discovered in the Contract Documents and the written resolution thereof by City is acceptable to the Firm. This solicitation is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation; the Firm has not directly or indirectly induced or solicited any other Firms to submit a false or sham Bid; the Firm has not solicited or induced any person, firm or corporation to refrain from Bidding; and Firm has not sought by collusion to obtain for itself any advantage over any other Firms or over the City. The City and the successful Firm will establish completion times for the services described in this Request for Qualifications and the successful Firm agrees that the services will be completed within the time frames agreed upon and stipulated in the individual Notice to Proceed. City of Sunny Isles Beach |Request for Qualifications No. 20-07-01 38 Firm Name: _____________________________________________________________________________ Street Address: _____________________________________________________________________________ Mailing Address (if different): _____________________________________________________________________________ Telephone No. _______________________________Fax No. _________________________ Email Address: _______________________________FEIN No. __/__-__/__/__/__/__/__/__ *“B y s i g n i n g t h i s d o c u m e n t t h e R e s p o n d e r a g r e e s t o a l l T e r m s Signature: __________________________________________________________________ (Signature of authorized agent) Print Name: _________________________ Title: _________________________________________ THE EXECUTION OF THIS FORM CONSTITUTES THE UNEQUIVOCAL OFFER OF FIRM TO BE BOUND BY THE TERMS OF ITS SUBMISSION. FAILURE TO SIGN THIS SOLICITATION WHERE INDICATED ABOVE BY AN AUTHORIZED REPRESENTATIVE SHALL RENDER THE SUBMISSION NON-RESPONSIVE.THE CITY MAY, HOWEVER, IN ITS SOLE DISCRETION, ACCEPT ANY SUBMISSION THAT INCLUDES AN EXECUTED DOCUMENT, WHICH UNEQUIVOCALLY BINDS THE FIRM TO THE TERMS OF ITS OFFER. Saltz Michelson Architects, Inc. 3501 Griffin Road, Fort Lauderdale, FL 33312 Charles A. Michelson President (954) 266-2700 SMA@SaltzMichelson.com 592012166 (954) 266-2701 FL Broward Saltz Michelson Architects, Inc. Corporation President Charles A. Michelson President 18 th August 20 Florida Charles A. Michelson, President Saltz Michelson Architects, Inc. 3501 Griffin Road 59-2012166 Fort Lauderdale, FL 33312 Charles A. Michelson President 18th August 20 Sandra MacDonald Saltz Michelson Architects, Inc. 3501 Griffin Road Fort Lauderdale, FL 33312 President Charles A. Michelson, President Broward Chales A. Michelson PresidentSaltz Michelson Architects, Inc. Fort Lauderdale, FL 20-07-01 Doral, FL 18th August 18th August Saltz Michelson Architects, Inc.August 18, 2020 Charles A. Michelson, President Broward President Sandra MacDonald President Saltz Michelson Architects, Inc. 18th August 20 Charles A. Michelson, AIA, ACHA, LEED AP Charles A. Michelson Saltz Michelson Architects, Inc. Saltz Michelson Architects, Inc. President August 18, 2020 1 ADDENDUM # 1 DATE: Friday, July 17, 2020 TO: ALL PLANHOLDERS FROM: Purchasing Administrator BID NO.: RFQ 20-07-01 Continuing Professional Consulting Services (CCNA) SUBJECT: Addendum No. 1 BID SUBMITTAL DEADLINE: Tuesday, August 11, 2020 at 2:30 PM Please attach this addendum to the documents in your possession and include the Acknowledgement of Addenda form with your response incorporated with the Request for Qualifications. Revisions: (Note: Deletions will be indicated by strikethrough, additions will be indicated with bold font): Q1.We do not have an architecture license, but do have a landscape architecture license and would like to submit for landscape architecture services. Please confirm that a registered Landscape Architecture firm can submit under Category 1—Architects. A1.The City is currently not soliciting for landscape architecture services under this continuing RFQ. Q2. Is LEED accreditation required if the respondent has and includes their professional license or is LEED accreditation required in addition to license? A2.LEED accreditation would be in addition to professional license. Q3. Re: SECTION 1: INSTRUCTIONS TO RESPONDENTS / GENERAL TERMS AND CONDITIONS, 1.24 CERTIFICATE (S) OF INSURANCE: “At the time of Firms submission the Firm must submit certificates of insurance as outlined in the General Conditions section. All required insurances shall name the City of Sunny Isles Beach as additional insured and such insurance shall be issued by companies authorized to issue insurance in the State of Florida.” Do certificates naming the City as an additional insured need to be submitted with the RFQ response or are specimen certificates evidencing proof of coverage acceptable, provided the required certificates are submitted in the event of contract award? A3.Evidence of proof of coverage is acceptable at the time of submittal however, upon contract award the COI must have the City listed as an additional insured. Q4.Section 2.6.1 LICENSING REQUIREMENTS: “At a minimum, Respondents must have at least one (1) team member accredited in the United States Green Building Council Leadership in Energy and Environmental Design (LEED).” Is Envision Sustainability Professional (ENV SP) certification acceptable as a substitute? As civil engineers, this certification is more applicable to our potential scopes of work than LEED. A4.Yes for engineering disciplines. Q5.Section 5.0 FORMAT: E. Qualification Information and Assigned Personnel requests submission of “Form SF330, include Part I and Part II” and F. Firm References and Similar Work Completed requests submission of Qualification Statement, resumes for proposed 2 personnel, project experience, organizational chart, etc. As these items are included in the SF 330, does the City want the information repeated in both sections? A5.Firms may submit the SF 330 in lieu of resumes. Q6. Section 5.0 FORMAT, F. Firm References and Similar Work Completed, “The title and a brief description of each project and/or service shall include:… Item e. -Past 5 years copies of executed agreements made between your firm and local municipalities, with a scope similar to this RFQ.If sub-consultants are a part of the proposed work plan, include items A through E for each firm, including an organizational chart showing the relationship between the responding firm and the sub firm(s).” Does the City want executed agreements included for each project submitted as relevant experience, for each firm (prime and subs)? They are generally lengthy. A6.Due to the length of these agreements, if your firm has an active contract/PO within the past 5 years with local municipalities please state the agency’s name, project scope and contract amount in lieu of attaching the contract(s). Q7. Does the City want copies of professional licenses included in Section E. Qualification Information and Assigned Personnel or Section H. Forms and Attachments? A7.Section E. Q8. Pg. 12 of the above referenced RFQ states on page 12 (see attached) that at least 1 Team member must be LEED Accredited. However we are a Structural Engineering Firm and as such LEED is not applicable to our services. Therefore no one on our staff Is LEED Accredited. Please advise if this precludes our firm from submitting for this solicitation. Thank you. A8.No, LEED would apply to architectural prime consultants. Q9. We are an environmental consulting firm interested in pursuing the subject RFQ for the “Environmental Engineering” discipline. However, Section 2.6.1 of the RFQ appears to eliminate us from eligibility and so I’m writing for some clarification. We are not an engineering, architecture, or landscape architecture firm. Our services are not regulated by the Florida Department of Business and Professional Regulation and so we could not meet the requirements of the last bullet of section 2.6.1, although we are properly registered and in compliance with the State of Florida (Division of Corporations). Is it the City’s intent for the “Environmental Engineering” discipline to only be serviced by licensed engineering firms? I recognize the scope could be interpreted to focus on Phase I/Phase II Environmental Assessments, in which case we would not be qualified. But the broad description of “monitoring and mitigation, environmental studies and reports” and the permitting scope are commonly used to describe our work, albeit associated with wetlands, protected wildlife species, and water quality. I wanted to be sure this wasn’t an opportunity we were missing due to a technicality the City didn’t intend. A9.Environmental firms must comply with the requirements set forth in Section 2.6.1. of the RFQ, including that they be registered and in compliance with the State of Florida in addition to being licensed and registered with the Department of Business and Professional Regulation to practice in their profession in the State of Florida. 3 Q10. We are pursuing the Civil Engineering Category. Civil engineering projects may require geotechnical, survey, environmental, and/or materials testing services, etc. Does the City want us to submit a team with these potential subconsultants or use the firms selected in those categories under this solicitation if awarded a task order requiring those disciplines? A10.Yes, please submit your list of sub-consultants. Q11.Page 33 of the RFQ asks for Commodity Codes. Does this refer to the categories or does the City want NAICS codes listed on the form? A11.You may leave this section blank. Q12.Does the City require separate submittals for pursuing multiple scopes? A12.No, just make sure to indicate in section 6.1 the categories your firm is applying for. Q13.Can we submit only for the marine structures aspect of the Structural Engineering scope? Or would we have to pursue the entire category, including building structures? A13.You will need to submit for full structural services. Q14.Is it possible to submit under coastal/marine engineering being that that is our area of expertise? A14.Firm may submit under Environmental Engineering category. Q15. In the RFQ on page 1, it states all questions are due on Friday, July 17, 2020 by 5:00 PM.On page 3 it states, “All questions regarding this Request for Qualifications No. 20-07- 01 shall be directed in writing to Mauricio Betancur, CMC, City Clerk, Friday, July 24, 2020.” Can you please clarify if questions are due on July 17, 2020 by 5:00 PM or July 24, 2020? A15.The questions due date is Friday, July 24, 2020. Q16. Landscape Architect is listed under licensing requirements on page 11 -12 of the RFQ, which category should Landscape Architecture submit under? A16.The City is currently not soliciting for landscape architecture services under this continuing RFQ. Q.17 Surveyors and Mapping is listed in the scope of services, on page 11 - 12 it does not state licensing requirements for Surveying. To pursue for Surveyors and Mapping, can you please clarify if the firm and/or individual needs to be licensed? A17.The firm and/or individual needs to be registered in the State of Florida to engage in the practice of surveying and mapping under this contract. Q18. Under 2.6.1 Licensing Requirements, it states that the firm shall possess at minimum one of the following licenses; however, on the list, it also states that "at a minimum, respondents must have at least one LEED certified professional. Do you require all respondents to have a LEED certified professional in the team? 4 A18.Please refer to question # 8. Q19. What would be scope of the LEED certified professional? A19.Please refer to question # 8. Q20. Subconsultants may be inherent to work for several of the categories listed. For example, Civil Engineering may often require other support services (i.e. Survey, Geotechnical, MEP, Structural, Architecture, etc.). Shall we include any/all subconsultants we may need in order to accomplish any given task under this contract? A20.Yes, please submit your list of sub-consultant(s). Q21. Please elaborate on what , specifically. The City is looking for under Item E (i.e. performance records of key personnel, work orders, copies of contracts). Are contracts being requested or work orders for specific projects undertaken under continuing service contracts? A21.Please refer to question # 6. Q22. Does The City want individual project references or continuing service contracts references for this RFP? A22. Please refer to question # 6. Q23. Please elaborate on the first paragraph under Section E. Please differentiate which questions are geared towards key personnel and which questions are geared towards the firm, as they cannot be interchanged. A23.This information may be filled out according to the SF 330. Q24.Please elaborate on the following statement on page 31: “If sub-consultants are a part of the proposed work plan, include items A through E for each firm,including an organizational chart showing the relationship between the responding firm and the sub firm(s).” A24. Please include sub-consultant(s)qualifications as well with RFQ response, as required on page 31. 1 ADDENDUM # 2 DATE: Tuesday, July 28, 2020 TO: ALL PLANHOLDERS FROM: Purchasing Administrator BID NO.: RFQ 20-07-01 Continuing Professional Consulting Services (CCNA) SUBJECT: Addendum No. 2 BID SUBMITTAL DEADLINE: Tuesday, August 11, 2020 at 2:30 PM Please attach this addendum to the documents in your possession and include the Acknowledgement of Addenda form with your response incorporated with the Request for Qualifications. Revisions: (Note: Deletions will be indicated by strikethrough, additions will be indicated with bold font): Q1.Will there be a pre-bid meeting/conference for this RFQ? A1.No. Q2. Section 2, 2.1 mentions Architectural, Civil Engineering, Electrical Engineering, Structural Engineering among other professional services. Does the city anticipate a need for Mechanical, Plumbing, Fire Protection Engineering? A2.This will be covered under the Architecture category as a sub-consultant to the Prime or within the Architecture Firm. Q3. Does the city know how many firms will be selected for each of the disciplines mentioned in Section 2, 2.1. A3.No, we do not have a minimum or maximum number for firms per category. Q4.Under Section 2.6 – “The successful firm must have a minimum of five (5) years business experience….” Question: Does the five years infer five years as a registered company or LLC, or experience in running a business? A4.The firm must have a minimum of 5 years in their respective discipline. Q5. Under Section 2.6.1 – “….the firm shall possess at minimum one of the following licenses….” State of Florida Surveying and Mapping license is not listed. Question: Was this license omitted from the list in error? A5.The firm and/or individual needs to be registered in the State of Florida to qualify and engage in the practice of surveying and mapping under this contract. 2 Q6.Under Section 2.6.1 – “At a minimum, Respondents must have at least one team member accredited in the United States Green Building Council Leadership in Energy and Environmental Design (LEED)” Question: Whereas Surveying and Mapping is not a design discipline, is the LEED certification required for a Surveying and Mapping team member? A6 .No, LEED would apply to architectural prime consultants. Q7.Please clarify that subconsultants are required to provide an individual title page, individual table of contents, an individual approach and cover letter for the RFQ submittal for one team. Q24. Please elaborate on the following statement on page 31: “If sub-consultants are a part of the proposed work plan, include items A through E for each firm, including an organizational chart showing the relationship between the responding firm and the sub firm(s).” A24. Please include sub-consultant(s) qualifications as well with RFQ response, as required on page 31. A. Title Page B. Table of Contents C. Cover Letter and Executive Summary D. Project Approach and Understanding E. Qualification Information and Assigned Personnel A7 .If sub-consultants are a part of the proposed work plan, include items A through E for each firm, including an organizational chart showing the relationship between the responding firm and the sub firm(s). a. Client Name, Address, Contact, Phone and Fax Numbers and valid e-mail address; b. Project Title; c. Description of work performed, including the project location; and d. Year completed. e. Past 5 years copies of executed agreements made between your firm and local municipalities, with a scope similar to this RFQ. Please refer to addendum # 1 regarding executed contracts. 1 ADDENDUM # 3 DATE: Monday, August 03, 2020 TO: ALL PLANHOLDERS FROM: Purchasing Administrator BID NO.: RFQ 20-07-01 Continuing Professional Consulting Services (CCNA) SUBJECT: Addendum No. 3 BID SUBMITTAL DEADLINE: Tuesday, August 11, 2020 at 2:30 PM Please attach this addendum to the documents in your possession and include the Acknowledgement of Addenda form with your response incorporated with the Request for Qualifications. Revisions: (Note: Deletions will be indicated by strikethrough, additions will be indicated with bold font): Q1.Section 2, 2.1 mentions Architectural, Civil Engineering, Electrical Engineering, Structural Engineering among other professional services. Does the city anticipate a need for Mechanical, Plumbing, Fire Protection Engineering? A2. This will be covered under the Architecture category as a sub-consultant to the Prime or within the Architecture Firm. Based on the RFQ and attached 6.1 Form, my firm was hoping to submit for MEP services which are listed out separate from Architecture. The wording in the RFQ makes it seem as though you can submit for services labeled 1 through 10 in Form 6.1. Can we not submit without an Architecture prime for this RFQ? A1.Yes,you may submit separately. 1 ADDENDUM # 4 DATE: Friday, August 07, 2020 TO: ALL PLANHOLDERS FROM: Purchasing Administrator BID NO.: RFQ 20-07-01 Continuing Professional Consulting Services (CCNA) SUBJECT: Addendum No. 4 BID SUBMITTAL DEADLINE: Tuesday, August 11, 2020 at 2:30 PM Extended to: Tuesday, August 18, 2020 Please attach this addendum to the documents in your possession and include the Acknowledgement of Addenda form with your response incorporated with the Request for Qualifications. Revisions: (Note: Deletions will be indicated by strikethrough, additions will be indicated with bold font): Q1.We kindly request that an extension be considered for the above subject solicitation. A1.The RFQ opening has been extended to Tuesday, August 18, 2020 at 2:30 PM. FORMS AND ATTACHMENTSH. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 114 INSR ADDLSUBRLTRINSR WVD DATE (MM/DD/YYYY) PRODUCER CONTACTNAME:FAXPHONE(A/C, No):(A/C, No, Ext):E-MAILADDRESS: INSURER A : INSURED INSURER B : INSURER C : INSURER D : INSURER E : INSURER F : POLICY NUMBER POLICY EFF POLICY EXPTYPE OF INSURANCE LIMITS(MM/DD/YYYY) (MM/DD/YYYY) COMMERCIAL GENERAL LIABILITY AUTOMOBILE LIABILITY UMBRELLA LIAB EXCESS LIAB WORKERS COMPENSATION AND EMPLOYERS' LIABILITY DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) AUTHORIZED REPRESENTATIVE INSURER(S) AFFORDING COVERAGE NAIC # Y / N N / A (Mandatory in NH) ANY PROPRIETOR/PARTNER/EXECUTIVEOFFICER/MEMBER EXCLUDED? EACH OCCURRENCE $ DAMAGE TO RENTED $PREMISES (Ea occurrence)CLAIMS-MADE OCCUR MED EXP (Any one person) $ PERSONAL & ADV INJURY $ GENERAL AGGREGATE $ GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMP/OP AGG $ $ PRO- OTHER: LOCJECT COMBINED SINGLE LIMIT $(Ea accident) BODILY INJURY (Per person) $ANY AUTO OWNED SCHEDULED BODILY INJURY (Per accident) $AUTOS ONLY AUTOS AUTOS ONLYHIRED PROPERTY DAMAGE $AUTOS ONLY (Per accident) $ OCCUR EACH OCCURRENCE $ CLAIMS-MADE AGGREGATE $ DED RETENTION $ $ PER OTH-STATUTE ER E.L. EACH ACCIDENT $ E.L. DISEASE - EA EMPLOYEE $If yes, describe under E.L. DISEASE - POLICY LIMIT $DESCRIPTION OF OPERATIONS below POLICY NON-OWNED SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer any rights to the certificate holder in lieu of such endorsement(s). COVERAGES CERTIFICATE NUMBER:REVISION NUMBER: CERTIFICATE HOLDER CANCELLATION © 1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORDACORD 25 (2016/03) ACORDTM CERTIFICATE OF LIABILITY INSURANCE Travelers Property Cas. Co. of America Commerce & Industry Insurance Co. Travelers Casualty and Surety Company Everest National Insurance Company 06/14/2020 USI Insurance Services, LLC 2502 N Rocky Point Drive Suite 400 Tampa, FL 33607 813 321-7500 Saltz Michelson Architects, Inc. 3501 Griffin Road Fort Lauderdale, FL 33312 25674 19410 19038 10120 A X X X X X 6601D208313 05/08/2020 05/08/2021 2,000,000 1,000,000 10,000 2,000,000 4,000,000 4,000,000 A X X X X 6601D208313 05/08/2020 05/08/2021 2,000,000 B X X X 0 X X EBU016439560 05/08/2020 05/08/2021 5,000,000 5,000,000 C X UB0K953533 04/01/2020 04/01/2021 X 1,000,000 1,000,000 1,000,000 D Professional Liability PL5EO00259201 06/14/2020 06/14/2021 $3,000,000 per claim $3,000,000 annl aggr. Professional Liability coverage is written on a claims-made basis. For Proposal Purposes 1 of 1#S29039404/M29039403 SALTZMIC1Client#: 1048451 MRLEW1 of 1#S29039404/M29039403 FORMS AND ATTACHMENTSH. CONTINUING PROFESSIONAL CONSULTING SERVICES (ARCHITECTURE) City of Sunny Isles Beach RFQ 20-07-01| PAGE 115 Please refer to Section E – Qualification Information and Assigned Personnel for licenses of the firm, subconsultants, and all key staff. Licenses