Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Coastal Systems International, Inc.
Statement of QualicationsStatement of QualicationsStatement of QualicationsStatement of Qualications Prepared For: Mr. Mauricio Betancur City Clerk City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, Florida 33160 Prepared By: Mr. R. Harvey Sasso, P.E. Coastal Systems International, Inc. 464 South Dixie Highway Coral Gables, FL 33146 Continuing Professional Consulting Services City of Sunny Isles Beach RFQ 20-07-01 1-3 4-14 15-22 23-83 84-87 88 88-98 99 100-116 Table of ContentsTable of ContentsTable of ContentsTable of Contents Cover Letter and Executive SummaryCover Letter and Executive SummaryCover Letter and Executive SummaryCover Letter and Executive Summary Cover Letter ................................................................................................................................................................. Executive Summary..................................................................................................................................................... Project Approach and UnderstandingProject Approach and UnderstandingProject Approach and UnderstandingProject Approach and Understanding Project Approach and Understanding……………….................................................................................................. Qualification Information and Assigned PersonnelQualification Information and Assigned PersonnelQualification Information and Assigned PersonnelQualification Information and Assigned Personnel SF330s......................................................................................................................................................................... Licenses....................................................................................................................................................................... Firm References and Similar Work CompletedFirm References and Similar Work CompletedFirm References and Similar Work CompletedFirm References and Similar Work Completed Firm References........................................................................................................................................................... Executed Agreements with Local Municipalities......................................................................................................... Corporate Standing and Authorized SignatoryCorporate Standing and Authorized SignatoryCorporate Standing and Authorized SignatoryCorporate Standing and Authorized Signatory Corporate Standing and Authorized Signatory............................................................................................................ Forms and AttachmentsForms and AttachmentsForms and AttachmentsForms and Attachments Forms and Attachments.............................................................................................................................................. 1111 Cover Letter and Executive SummaryCover Letter and Executive SummaryCover Letter and Executive SummaryCover Letter and Executive Summary COASTAL SYSTEMS INTERNATIONAL, INC. 464 South Dixie Highway • Coral Gables, Florida 33146 Tel: 305-661-3655 • Fax: 305-661-1914 www.coastalsystemsint.com 398900 August 18, 2020 Mr. Mauricio Betancur City of Sunny Isles BeachCity of Sunny Isles BeachCity of Sunny Isles BeachCity of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, Florida 33160 RE: Continuing Professional Consulting Services (RFQ No. 20RE: Continuing Professional Consulting Services (RFQ No. 20RE: Continuing Professional Consulting Services (RFQ No. 20RE: Continuing Professional Consulting Services (RFQ No. 20----07070707----01) 01) 01) 01) –––– City of Sunny Isles City of Sunny Isles City of Sunny Isles City of Sunny Isles Beach, FloridaBeach, FloridaBeach, FloridaBeach, Florida Dear Mr. Betancur, Coastal Systems International, Inc. (Coastal Systems) is pleased to submit the attached Statement of Qualifications (SOQ) in response to the City of Sunny Isles Beach’s (City) Request for Qualifications (RFQ) for Continuing Professional Consulting Services. This SOQ includes a summary of our firm’s experience, relevant projects and key personnel resumes in SF 330 format. Coastal Systems has an established reputation for planning effective strategies and delivering complex projects in coastal and waterfront communities. Our experience involves site investigations, planning, permitting, engineering design and construction management of coastal and waterfront projects. Our experience extends through construction of a project and its subsequent close-out, providing a comprehensive set of services through the end of each project. Coastal Systems' organizational structure is designed for efficiency, cost-effectiveness, design optimization, and high levels of production throughout all phases of project implementation. For over 25 years, Coastal Systems has helped clients realize their vision by engineering cost-effective solutions in the design of public space improvements, beaches, coastal structures, marinas, environmental and habitat enhancements, resilient infrastructure and other specialized projects. Coastal Systems is submitting qualifications for the following categories: • Civil Engineering • Environmental Engineering o Marine Structural Engineering o Coastal Engineering August 18, 2020 Professional Consulting Services City of Sunny Isles Beach RFQ No. 20-07-01 Page 2 We have assembled a highly qualified team of sub-consultants that can effectively deliver the required scope of services to supplement Coastal Systems’ staff: • Ardaman & Associates, Inc.: Geotechnical Engineering • Basulto & Associates, Inc.: Mechanical, Electrical and Plumbing Engineering • Gallagher Bassett Technical Services: Environmental Testing & Assessments • Martinez & Martinez: Topographic Surveying • Savino & Miller Design Studio: Landscape Architecture • Traf Tech Engineering, Inc.: Traffic Engineering Our firm maintains cooperative working relationships with our proposed sub-consultants and have collaborated with all firms listed above on current and past projects in South Florida. Extensive Background & Understanding of the City of Sunny Isles BeachExtensive Background & Understanding of the City of Sunny Isles BeachExtensive Background & Understanding of the City of Sunny Isles BeachExtensive Background & Understanding of the City of Sunny Isles Beach Coastal Systems possesses vast local knowledge through the firm’s comprehensive history of providing professional engineering and environmental permitting services within the City of Sunny Isles Beach. Coastal Systems has provided the City with coastal engineering, beach management and environmental permitting services since 2008. In addition to public projects, the firm has extensive experience within the City on private site developments. Some recent experience includes environmental and coastal permitting services for luxury developments such as Porsche Design Tower, Turnberry Ocean Club, Chateau Beach and Jade Signature. ValueValueValueValue----Added ServicesAdded ServicesAdded ServicesAdded Services Coastal Systems is customer-focused, identifying and resolving clients' needs throughout the design process and beyond. We analyze every project for opportunities to create value through innovations in design, construction, and system maintenance, pooling the diverse talents of our team to achieve a functional, cost-effective finished product. Boutique Firm LevBoutique Firm LevBoutique Firm LevBoutique Firm Level of Serviceel of Serviceel of Serviceel of Service Coastal Systems is a small, individually owned firm offering a high degree of client support. We have the ability to exercise flexibility during the various stages of project planning, permitting, and construction, enabling our firm to provide a higher-level service to the City. The small firm format also allows direct involvement of the principal professionals and senior staff, ensuring the highest possible level of experience is brought to the projects issued under this contract. Our dedication to quality guarantees clients with effective solutions and a superior work product. Firm RepresentativeFirm RepresentativeFirm RepresentativeFirm Representative Andres Perez, P.E. will serve as the City’s main point-of-contact for projects issued under this contract. Andres brings over 20 years of civil and marine engineering design expertise, August 18, 2020 Professional Consulting Services City of Sunny Isles Beach RFQ No. 20-07-01 Page 4 Executive Summary Executive Summary Executive Summary Executive Summary Coastal Systems International, Inc.Coastal Systems International, Inc.Coastal Systems International, Inc.Coastal Systems International, Inc. (Coastal Systems) has an established reputation for planning effective strategies and delivering complex projects in coastal communities. For over 25 years, Coastal Systems has helped clients realize their vision by engineering cost- effective solutions in the design of civil works, stormwater management systems, resilient infrastructure, environmental and habitat enhancements, public space improvements, coastal structures, beaches, marine works and other specialized projects. Our experience includes performing site investigations, applying coastal engineering numerical models, conducting municipality vulnerability assessments, and leading in the planning, environmental permitting, engineering design and construction management of civil and coastal projects. Our team is also proficient in securing financing opportunities for public projects. We have amassed significant experience in managing projects throughout Florida, the Caribbean and the Americas. Coastal Systems began as a small coastal engineering and regulatory-permitting firm in South Florida in the mid 1980's. Over the years, we have expanded our professional services to include: • Coastal Engineering • Site Investigations • Marine Environmental • Coastal Resilience • Regulatory Permitting • Construction Management • Civil Engineering • Waterfront & Marinas • Destination Development The company maintains a diversified staff of 20+ individuals, including specialized Project Managers, Engineers, Marine Scientists, CAD Technicians and Surveyors. Our team is dedicated to serving clients with a multi-disciplined approach, while ensuring diligent and personalized service. The firm is uniquely organized with field investigation, engineering and environmental/permitting teams to provide all of the technical elements required for project implementation. August 18, 2020 Professional Consulting Services City of Sunny Isles Beach RFQ No. 20-07-01 Page 5 Field Field Field Field Investigations and Marine Resource AssessmentsInvestigations and Marine Resource AssessmentsInvestigations and Marine Resource AssessmentsInvestigations and Marine Resource Assessments Coastal Systems offers a full range of hydrographic and marine resource mapping capabilities. Coastal Systems maintains a full inventory of equipment including GPS receivers, survey vessels, fathometers, total stations, towed underwater video, current meters and other related equipment. The team utilizes GIS to process and import a variety of data from multiple sources for analysis combining land and waterbared equipment. Coastal Systems has demonstrated project experience providing marine resource assessment and monitoring consulting services. Services range from resource mapping, species identification, hardbottom monitoring, seagrass restoration planning and design, as well as mangrove assessment and design. These marine resource surveys are essential for the planning of waterfront improvements in order to understand potential impacts of proposed improvements with respect to seagrass and other resources. In-house marine biologists conduct the surveys with specialized equipment such as towed-underwater video mapping systems, facilitating proper design. The Coastal Systems team has full data processing capabilities including digital terrain models for topographic contour maps and earthworks/dredging calculations. Marine resource data is incorporated into these maps. Civil EngineeringCivil EngineeringCivil EngineeringCivil Engineering Coastal Systems’ civil engineers work closely with diverse project teams to provide civil engineering services for site development and improvements. Paving, grading and drainage design services are provided along with water and sanitary sewer services. Working relationships are maintained with Florida state and local regulatory agencies with jurisdiction on site planning projects to facilitate plans approval through the stringent codes and regulations. Coastal Systems’ team works effectively for the successful implementation of projects on local, state and federal levels. Our Miami-based firm has been dedicated to building a solid reputation as a professional, innovative, and technically superior team committed to client satisfaction. Our engineering team works closely with local municipalities on the design of new urban plan developments, off-site improvements and public/private on-site developments. Among the services provided for these projects are design for water and sewer mains or service connections, and stormwater management including paving, grading, and drainage design. Frequently utilized drainage management systems include roof and Right-of-Way drainage systems that harvest rainwater for the purpose of irrigation to large planting areas subsequent to the flooding event. The systems are designed to contain the full amount of water produced by storm events to satisfy state and local requirements for 25-year (3-day) and 100-year (1-day) events. August 18, 2020 Professional Consulting Services City of Sunny Isles Beach RFQ No. 20-07-01 Page 6 Water Resources/Stormwater ManagementWater Resources/Stormwater ManagementWater Resources/Stormwater ManagementWater Resources/Stormwater Management Poor water quality caused by surface and stormwater runoff poses a threat to human health, the ecosystem and the natural environments around which our businesses, homes and parks are built. Poor stormwater management can also lead to unnecessary flood damage, creating burdensome costs to landowners and taxpayers. The civil engineers at Coastal Systems have demonstrated project experience with the design and permitting of stormwater management plans throughout Florida. Services are routinely provided to clients in support of site development. Whether it is the implementation of an infiltration trench, an outfall backflow preventor and baffle box, or a Best Management Practice (BMP) project, the civil engineering team has all the necessary capabilities. The team strives to keep abreast of the constantly changing local, state and federal regulations in municipal stormwater projects. Public Infrastructure/AmenitiesPublic Infrastructure/AmenitiesPublic Infrastructure/AmenitiesPublic Infrastructure/Amenities Coastal Systems has extensive experience in designing and permitting public infrastructure and amenity projects, including park, trailway, and street improvements. A particular specialty is the integration of public walkways and natural habitat enhancements into waterfront environments, creating a comprehensive waterfront with pedestrian-friendly green spaces and increased shoreline connectivity. Previous projects include recreational shorelines, oceanfront access, and coastal dune habitat improvements, as well as bayfront/Intracoastal park upgrades with natural shoreline stabilization design. Coastal Systems works to maximize the experience of the various public amenity user groups, while minimizing environmental footprint and being sensitive to construction cost and maintenance issues. Coastal Systems has worked with many public clients to enhance access to waterfront areas and the public experience in these special environments. These include shoreline stabilization and beautification projects using structural and vegetated design solutions, pedestrian trails and transportation connections, public docks and viewing platforms, kayak launch areas, ADA access design, and other park and public area improvements. Coastal Systems has also provided public clients with recommendations for planning and design standards in coastal and waterfront areas to allow appropriate consideration for area-specific issues such as flood and coastal storm vulnerability, endangered species protection, riparian rights and navigational safety. Coastal EngineeringCoastal EngineeringCoastal EngineeringCoastal Engineering Coastal Systems has provided a vast array of coastal engineering services throughout Florida and the Caribbean. From initial field investigations to coastal process modeling with state-of-the-art software, Coastal Systems has the tools and experienced staff to understand August 18, 2020 Professional Consulting Services City of Sunny Isles Beach RFQ No. 20-07-01 Page 7 coastal problems and provide cost-effective solutions. Our proven track record with complex projects in the Florida and the Caribbean is a testament to our capabilities. Coastal Systems has developed a strong capability in utilizing advanced numerical models to simulate coastal processes at beaches, inlets, waterway systems and waterfront/coastal areas. These services include the analysis of winds, waves, storm surge, sediment transport, water quality (flushing) and tidal current that will affect marine structures, vital infrastructure and beaches. Coastal Systems utilizes the Danish Hydraulics Institute (DHI) MIKE-21 software package to simulate techniques to model hurricanes and associated storm surge and waves, hydrodynamic processes, water quality, sediment transport processes and morphological changes. Our firm’s numerical modeling capabilities have also been utilized in the detailed design of coastal/waterfront projects involving wave refraction and diffraction simulation, current-wave interactions, Sargassum deposition, longshore sediment transport, and sediment deposition along the coast. Coastal Systems has developed a very strong capability in the practical application of these models based on design projects conducted in Florida and internationally. o MIKE-21 Hydrodynamic – MIKE-21 is a professional engineering software package developed by DHI Water and Environment. The MIKE-21 FM Hydrodynamic (HD) model simulates two-dimensional water level variations and flows in response to a variety of forcing functions in lakes, estuaries, bays and coastal areas. o MIKE-21 Boussinesq Waves – The Boussinesq Wave model (MIKE-21 BW) is the state-of-the-art numerical model for calculation and analysis of short- and long- period waves in ports, harbors and coastal areas. MIKE-21 BW can also be used for detailed modeling of wave-induced current fields, surf zone dynamics and swash zone oscillations. MIKE-21 BW is capable of reproducing the combined effects of all important wave phenomena of interest in port, harbor and coastal engineering; these include shoaling, refraction, diffraction, wave breaking, bottom friction, moving shoreline, partial reflection and transmission, non-linear wave-wave interaction, frequency spreading and directional spreading. o MIKE-21 Spectral Waves – The Spectral Wave Model (MIKE-21 SW) is a new generation spectral wind-wave model, used for the assessment of wave climates in offshore/coastal areas in hindcast and forecast mode. The model simulates the growth, decay and transformation of wind-generated waves in offshore and coastal areas. A major application for this model is the design of offshore, coastal and port structures where accurate assessment of wave loads is of utmost importance to the safe and economic design of coastal infrastructure. o LITPACK/LITLINE – LITPACK combines a technical deterministic sediment transport model with user-friendly facilities for the simulation of a large number of wave/current August 18, 2020 Professional Consulting Services City of Sunny Isles Beach RFQ No. 20-07-01 Page 8 scenarios. These simulations provide predictions regarding the net littoral drift, developments of coastal profiles and long-term coastline evolution for a project area. Coastal/Marine StructuresCoastal/Marine StructuresCoastal/Marine StructuresCoastal/Marine Structures Our engineering team has designed and/or analyzed numerous coastal/marine structural projects throughout Florida. The professional engineering staff at Coastal Systems employs the latest in numerical modeling technology to properly assess and design coastal structures including seawalls, groins, breakwaters, and jetties. We routinely conduct feasibility, coastal engineering and environmental studies in support of the coastal design effort. Existing structures are also evaluated through a damage assessment with rehabilitation schemes developed to restore shoreline protection. We routinely conduct feasibility, coastal engineering and environmental studies in support of the coastal design effort. In-house personnel can provide all necessary field investigation services including hydrographic surveys, oceanographic data collection, geotechnical investigations, and mapping to supplement the design. Marinas & Docking Facilities Marinas & Docking Facilities Marinas & Docking Facilities Marinas & Docking Facilities The marina engineering team at Coastal Systems has a proven track record with numerous marina and docking facility projects successfully completed in Florida. The team combines the expertise of the firm providing the full range of environmental, coastal, structural and utility engineering services for a cost-effective approach to marina and docking facility design. Coastal Systems focuses on unique designs, such as wave baffles, that also provide environmental habitat as part of mitigation efforts. The team is meticulous in specifying marine construction materials for maximum service life and minimal maintenance. The design team prepares project approaches that comply with regulatory requirements while continuing to meet and exceed the client’s objectives. The marina team specializes in coastal projects and megayacht facility designs throughout Florida. From 1 to 250 slips, the team has the capability and experience of providing innovative solutions to marina projects. From the initial planning and environmental assessment phases to final design and construction, Coastal Systems assists marina developers with required services for project success. Coastal Systems has demonstrated project experience with various types of materials. Coastal Systems understands the advantages and disadvantages of different types of floating docks, from both a design and resilient perspective. Coastal Systems strives to specify the right product for proper application, and to allow a level of competition to reduce construction costs. August 18, 2020 Professional Consulting Services City of Sunny Isles Beach RFQ No. 20-07-01 Page 9 Facilities Assessment Facilities Assessment Facilities Assessment Facilities Assessment The engineering team at Coastal Systems has extensive experience evaluating existing marine structures, including piers, wharves, bulkheads, marinas, and coastal structures such as breakwaters and seawalls. Above- and below-water investigations are conducted by engineer-divers to assess the structural condition of a typical facility. All types of materials, including timber, concrete, steel and composite materials, have been evaluated on past projects. Above/below water photographic and videographic documentation are routinely provided. The waterfront team has a keen understanding of the deterioration of construction materials in the marine environment. This experience allows the team to make rehabilitation recommendations in terms of the remaining service life of the structure for the most cost- effective approach, thus avoiding costly and unnecessary repairs. Options can be prepared for the facility to make the appropriate business decision on whether to fix or replace the infrastructure. In some cases, the “do-nothing” approach may be the best approach for the economic life of a facility. A structural analysis of the existing facility is conducted to determine the safe loading capacity based on the observed conditions. Resilient Design Resilient Design Resilient Design Resilient Design Coastal Systems works towards informing, preparing and designing communities to be able to rebound quickly from weather and climate-related events, including adapting to sea level rise. Coastal resilience is the capability of a community to recover quickly after hazardous events such as hurricanes, coastal storms, and flooding. It requires the proactive preparation for these events—rather than reacting to their impacts. Population increases and larger concentrations of valuable infrastructure in high-risk areas such as the coast must be taken into consideration when planning for resilience. Coastal Systems recognizes the socio-economic, environmental and financial factors when designing for a stronger, more resilient community. Coastal Systems’ extensive experience in coastal and civil engineering, coupled with our agency relationships, uniquely qualifies our team to assist local communities with the implementation of municipal and county coastal resilience plans. This includes aiding government with creating a resilience strategy, providing inundation maps, conducting sea level rise vulnerability assessments, performing storm impact studies, designing stormwater retrofitting plans, prioritizing adaptation projects and providing cost/benefit analyses of proposed projects. Coastal Systems is fully adept in providing engineered solutions to strengthen and protect coastal and waterfront communities. Vulnerability AssessmentsVulnerability AssessmentsVulnerability AssessmentsVulnerability Assessments Coastal Systems is working with both public and private clients towards strengthening communities’ coastal resilience efforts. Our vast coastal engineering knowledge relating to August 18, 2020 Professional Consulting Services City of Sunny Isles Beach RFQ No. 20-07-01 Page 10 numerical modeling, sea level rise projections, storm surge analysis, resilient design, damage assessment and economic vulnerability analysis to uplands uniquely qualifies our team to deliver this project. Coastal Systems’ extensive background in coastal and civil engineering plays a vital part in the planning and implementation of this scope. Coastal Systems’ understanding of the present and future King Tide elevations, stormwater modeling capabilities, and expertise in site/civil design provides our team the means to design and develop budgets for effective and innovative drainage systems; these systems can be adapted to the changes in site conditions associated with sea level rise and climate change. Federal Emergency Management Agency (FEMA) ServicesFederal Emergency Management Agency (FEMA) ServicesFederal Emergency Management Agency (FEMA) ServicesFederal Emergency Management Agency (FEMA) Services Coastal Systems has a strong local reputation with Federal Emergency Management Agency (FEMA) technical analysis and regulatory interpretations. Our specialized team utilizes historic, meteorologic, hydrologic, and hydraulic data to interpret floodplain management regulations and evaluate Special Flood Hazard Areas (SFHAs). FEMA engineers and cartographers delineate SFHAs on Flood Insurance Rate Maps (FIRMs). SFHAs are those areas subject to inundation by a flood that has a one percent or greater chance of being equaled or exceeded during any given year. Coastal Systems reviews the design goals of a project to provide information to the project developer or architect relative to acceptable project design alternatives. In addition, Coastal Systems provides services to obtain variances from local floodplain ordinances, letters of no obligation from FEMA, and processes revisions to the SFHAs, as necessary, to meet project objectives. The firm regularly processes Letters of Map Revisions (LOMR) that can significantly reduce flood insurance premiums. Coastal Systems' permitting and engineering team works closely with attorneys, developers, architects, local officials, FEMA representative consultants, and FEMA officials to determine the most efficient and cost-effective design alternative for projects located within SFHAs. In addition, the firm has extensive experience preparing site-specific analyses for Coastal A zones to aid planners and architects with site plans and design requirements for buildings. Coastal Systems employs a variety of numerical modeling applications to assist in the analysis and design of project improvements and alternatives. Two modeling applications employed specifically for FEMA interpretations are the Wave Height Analysis for Flood Insurance Studies (WHAFIS) model and the Wave Run-up Model, which determine the height of run-up landward of the still water line. Coastal Systems has successfully implemented both applications on numerous projects requiring FEMA compliance interpretation or variance. More complex state-of-the-art models are also utilized for site specific analyses. August 18, 2020 Professional Consulting Services City of Sunny Isles Beach RFQ No. 20-07-01 Page 11 Environmental Permitting Environmental Permitting Environmental Permitting Environmental Permitting Coastal Systems’ Environmental/Permitting Department successfully processes coastal and environmental permits annually, including Environmental Resource, Coastal Construction Control Line, and other related specialty negotiations. Our extensive scientific, engineering and legal knowledge, as well as excellent working relationship with the staff at federal state, country, and local regulatory agencies, aids us in expediting the processing of all required permits in record time with optimal results. This team works closely with the design team to ensure permitting feasibility through the design process. As part of the design phase, the Coastal Systems team reviews pertinent regulations and provides feedback to clients and the design team regarding implications of regulatory criteria to project design. Our focus on effective communication with municipal and agency staff, and stakeholders brings consensus to the final product and permit approvals. Coastal Systems uses their expertise in environmental permitting to ensure that a project’s initial design concept not only meets the needs of our clients with regard to form and function from engineering perspectives, but is also feasible in the context of local, federal and state environmental regulations that protect sensitive environmental resources. The team utilizes experienced project managers and scientists to analyze implications of the intricate environmental regulations to the design and implementation of the project from initial conceptual design through construction. As the project moves forward into design development and processing of environmental permits, every detail is custom-designed and managed, from use of sustainable materials that can withstand the harsh conditions to construction scheduling coordination with municipal events. Federal and state environmental permitting is coordinated to run concurrently with the client’s design review and permitting process to streamline the project schedule. Coastal Systems maintains working relationships with several regulatory agencies. The team’s project managers have extensive experience on over 25 years of projects with the following agencies: • Florida Department of Environmental Protection • U.S. Army Corps of Engineers • South Florida Water Management District • U.S. Fish and Wildlife Service • Florida Fish and Wildlife Conservation Commission • Municipal and County Departments of Environmental Resource Management Public Workshops and Community CharrettesPublic Workshops and Community CharrettesPublic Workshops and Community CharrettesPublic Workshops and Community Charrettes Coastal Systems recognizes the value of effective public outreach, engagement and facilitating relationships between stakeholders and City officials. The firm has extensive August 18, 2020 Professional Consulting Services City of Sunny Isles Beach RFQ No. 20-07-01 Page 12 experience in the public realm with major coastal, marine, urban development and public recreational projects in which communication and stakeholder liaison were vital to their successful implementation. Involving the public in the design process can assist in defining the "vision" of the project, which will set the course for implementation, as well as garner public support. Construction AdministrationConstruction AdministrationConstruction AdministrationConstruction Administration Coastal Systems has extensive experience developing construction cost estimates and assisting our clients through the complicated bidding process. We typically recommend an approach that emphasizes “best value procurement” as opposed to “low bid” procurement. Best value procurement involves the selection of a contractor through a combined review of qualifications, experience, and approach to the project, as well as their bid price. We assist our clients with developing contractor selection criteria specific to the project at hand and review bid submittals along with the project selection committee to address committee member questions and provide technical clarifications. Coastal Systems has extensive experience with site/civil construction administration. Services have included full time surveying, QA/QC, and inspections. Coastal Systems’ engineers spend a great deal of time on construction projects, as it is the firm’s policy for active participation in construction administration to ensure projects are constructed in accordance with the plans and specifications. Coastal Systems can provide the necessary construction management services for the City. At the completion of each project, Coastal Systems reviews the as-built surveys available and compiles the construction close-out documentation required for environmental permits. A final certification for project completion is then issued. Public Client ExperiencePublic Client ExperiencePublic Client ExperiencePublic Client Experience Coastal Systems is proud of the quality of services provided by the firm, and our high percentage of repeat clients testifies to the success of Coastal Systems' staff. Public sector clients, with most of whom we have had multiple or continuing service contracts, include: • Florida Department of Environmental Protection • Martin County • St. Lucie County • Sebastian Inlet District • Palm Beach County • Town of Palm Beach • City of West Palm Beach • Town of Ft. Myers Beach August 18, 2020 Professional Consulting Services City of Sunny Isles Beach RFQ No. 20-07-01 Page 13 • Hillsboro Inlet District • City of Hollywood Community Redevelopment Agency • City of Delray Beach • City of Deerfield Beach • City of Miami Beach • City of Miami • Miami-Dade County • Miami Downtown Development Authority • Bal Harbour Village • North Bay Village • Village of Key Biscayne WorkloadWorkloadWorkloadWorkload Coastal Systems has assembled a highly qualified team of professionals with demonstrated experience and qualifications in all of the areas of expertise required to plan, design, permit, and administer construction for projects issued under this contact. The team has adequate staff resources and knowledge to complete all tasks identified in the civil and environmental engineering disciplines of this contract. Coastal Systems will complete specific project planning, engineering analyses, design, cost and alternative analyses, permitting and construction administration tasks on time schedules mutually agreed between the City and our office. Based on current and projected workloads, our staff members have sufficient time available to dedicate to the successful completion of required project tasks in accordance with the City’s target schedule. Below is a summary of our firm’s current active workload: Project NameProject NameProject NameProject Name ClientClientClientClient Current ScopeCurrent ScopeCurrent ScopeCurrent Scope Miamarina, Miami City of Miami Marine Structural Engineering, Environmental Permitting Presbyterian Church Seawall, Miami City of Miami Marine Structural Engineering, Environmental Permitting Rickenbacker Causeway Hobie North, Miami-Dade County Miami-Dade County Coastal Engineering, Environmental Permitting Williams Island, Aventura Private Client Construction Administration Bayshore Park, Miami Beach City of Miami Beach Civil Engineering, Environmental Permitting Marine Stadium Restoration, Miami R.J. Heisenbottle Marine Structural Engineering, Environmental Permitting Maurice Gibb Memorial Park, Miami Beach City of Miami Beach Civil / Marine Engineering, Environmental Permitting Everglades Safari Park, Miami Private Client Civil / Marine Engineering, Environmental Permitting James L. Knight Center, Miami City of Miami Marine Structural Engineering, Environmental Permitting August 18, 2020 Professional Consulting Services City of Sunny Isles Beach RFQ No. 20-07-01 Page 14 Project NameProject NameProject NameProject Name ClientClientClientClient Current ScopeCurrent ScopeCurrent ScopeCurrent Scope Kenneth Myers Park, Miami City of Miami Civil / Marine Engineering, Environmental Permitting Haulover Park Marina, North Miami Beach AECOM Coastal / Civil / Marine Structural Engineering Miami District 5 Wayfinding Signs, Miami City of Miami Civil Engineering William Powell Bridge, Miami-Dade County Miami-Dade County Coastal / Civil Engineering, Environmental Permitting Boca Chica Mooring Field, Monroe County Monroe County Marine Engineering, Environmental Permitting Martin County Artificial Reef Martin County Biological Monitoring Adrienne Arsht Center, Miami Private Client Civil Engineering Fisher Island Club Maintenance Dredge, Miami Private Client Environmental Permitting Turnberry Ocean Club, Sunny Isles Beach Private Client Environmental Permitting Village Park, Bal Harbour Zyscovich Marine Structural Engineering, Environmental Permitting 2222 Project Approach and UnderstandingProject Approach and UnderstandingProject Approach and UnderstandingProject Approach and Understanding August 18, 2020 Professional Consulting Services City of Sunny Isles Beach RFQ No. 20-07-01 Page 15 Project Approach and UnderstandingProject Approach and UnderstandingProject Approach and UnderstandingProject Approach and Understanding Design MethodologyDesign MethodologyDesign MethodologyDesign Methodology Our design team, with over 25 years of professional experience, is committed to the successful implementation of our projects. The combination of the team’s background and experience as a multidisciplinary team of professionals in stormwater management, landscape architecture, urban design, planning, transportation, horticulture and biology give us unique insight into the various elements of a project, allowing us to formulate a unique vision. Our general methodology begins with: 1. A thorough understanding of the City of Sunny Isles Beach community and other stakeholders’ goals for the proposed project, as well as the opportunities for the surrounding neighborhoods. 2. An analysis of site factors such as: • Geographic: location, surrounding land use, and historical overlay • Environmental: soils, adjacent bathymetric elevations, groundwater elevations, existing vegetation, site contamination • Infrastructure: drainage capacity, utilities, topographic and roadway elevations, percentage of pervious area, seawall integrity 3. An analysis of the anticipated project management and maintenance procedures. Our team’s approach will be to first meet with the City and appropriate stakeholders to ascertain the goals of the proposed project in detail. Thorough site visits, surveys, and investigations will assist in determining any potential construction constraints, such as underground and overhead utilities, soil contamination, environmental resources, etc. Utilizing the obtained perspectives and regional existing conditions, we will begin the process of ecological and sustainable project design. The team will assist the City in conducting stakeholder and public meetings. We have participated in numerous public workshops to assist in educating the public on specific studies completed and on various infrastructure projects. We will ensure that technical information is effectively communicated to the public so that they understand the regulatory process and that the project in consideration has avoided and minimized impacts to the surrounding neighborhood and/or resources. Presentations, formatted to be in-person or virtual, will be prepared with appropriate graphics to illustrate the project purpose and anticipated permitting/design process. Coastal Systems will respond to technical questions August 18, 2020 Professional Consulting Services City of Sunny Isles Beach RFQ No. 20-07-01 Page 16 and concerns regarding the project. Summary meeting minutes will be compiled after each meeting and posted on the City’s website, as appropriate. Project Management PlanProject Management PlanProject Management PlanProject Management Plan Our team approaches every project individually to develop a design that will complement on-site conditions, meet the City’s program, be compatible with adjacent uses, and is consistent with local culture. For each project, we will carefully analyze the existing conditions, including but not limited to, environmental resources, geotechnical conditions, vegetation, topography, cultural resources, historic resources, circulation, access, adjacent uses, existing utilities, maintenance resources and stakeholder resources. This process allows for consideration of existing features concurrent with the development of potential new improvements. The preliminary design options will be evaluated through community outreach workshops and stakeholder meetings to arrive at a preferred design. Engineering plans and outreach documents will be prepared to include “Opportunities and Constraints” presentation boards, precedent images to help convey the design concept, and illustrations of the preferred plan. Our team will also prepare recommendations for future maintenance programs, including projected costs. Our Design Process is summarized as follows: Phase I – Study and Report 1. Pre-Design Services: a. Project kick-off meeting b. Site reconnaissance meetings c. Survey and historical site information review d. Geotechnical report preparation to understand subsoil characteristics, such as percolation and drainage capacity, and soil bearing capacity. e. Infrastructure inventory analysis to understand existing conditions, opportunities and constraints. 2. Vision Session and Meetings with City Staff, Commission, Committees, and/or Boards, as required to understand the goals and objectives for the project Phase II – Preliminary Design 1. Conceptual Design (30% Plans): August 18, 2020 Professional Consulting Services City of Sunny Isles Beach RFQ No. 20-07-01 Page 17 a. Project illustrations to include infrastructure plans, perspective sketches, sections, schedules of materials, plantings, and other elements necessary to convey proposed ideas for concept plans. b. Preliminary Budgets for concept plans. 2. Visioning Sessions with Staff, Mayor and Commission, Boards and Committees 3. Workshop Public/Community Meeting 4. Selected Conceptual Design submission to the City Phase III – Final Design and Construction Documents 1. Construction Document preparation once the conceptual design is approved by the City. 2. Phased plan production for design development. Design documents will be provided at 60%, 90%, and 100% completion to coordinate the effort with local, State, and Federal regulatory agencies having jurisdiction over the project. These agencies may include the following: • City of Sunny Isles Beach – Public Works • City of Sunny Isles Beach – Planning Department • City of Sunny Isles Beach – Building Department • City of Sunny Isles Beach – Fire Department • City of Sunny Isles Beach – Engineering Department • Miami-Dade County Department of Environmental Resource Management • Florida Department of Transportation (FDOT) • Florida Department of Environmental Protection • Florida Fish and Wildlife Service (FWS) and Conservation Commission (FWC) • U.S. Army Corps of Engineers • NOAA National Marine Fisheries Service 3. Environmental permitting to obtain all final permits for project construction. 4. Provide copies (electronic and hardcopies) as required by the City’s representative. 5. Presentations to City Commission & Stakeholders regarding project progress and final designs, if necessary. August 18, 2020 Professional Consulting Services City of Sunny Isles Beach RFQ No. 20-07-01 Page 18 Phase IV – Bidding 1. Attendance at Pre-Bid Conference. 2. Responses to Bidders' RFI's and Preparation of Addenda, as necessary. 3. Attendance at Bid Opening. 4. Assistance in Bid Evaluation and Recommendation of Award. Phase V – Construction/Demolition 1. Attendance at Pre-Construction Conference. 2. Attendance at weekly Construction Meetings, with the production and distribution of minutes. 3. Responses to Contractor’s Request for Information (RFI). 4. Responses to and evaluation of Contractor’s requests for change orders, contingency draws, shop drawings review and approval, and payment applications. 5. Specialty Site Visits. 6. Project Close-out Review: Substantial Completion and Final Punch List. 7. Final Completion Acceptance and Warranty Administration. August 18, 2020 Professional Consulting Services City of Sunny Isles Beach RFQ No. 20-07-01 Page 19 Sustainability & InnovationSustainability & InnovationSustainability & InnovationSustainability & Innovation Our team is committed to implementing sustainable, green practices. As specialized consultants, we will incorporate the use of best practices and technology for civil, marine structural and coastal engineering design. The project examples below incorporate innovative design concepts which can be implemented in future projects issued under the City’s contract. Civil Engineering: The Miracle Mile & Giralda Avenue Streetscape Improvements project’s drainage design incorporated a stormwater management system that used a combination of exfiltration trenches, with structural soil under the pavement to provide additional stormwater storage. The system also included Storm Capture Modules (open bottom concrete structures) which provide additional storage with the ability to discharge into the water table. The system included several overflow connections that discharge to the City’s overall master stormwater system. This effective drainage system, combined with pervious pavement and proper conveyance of surface water discharge, allowed for Miracle Mile to be designed for the 100 year – 1-day storm event without the use of expensive pump systems. The pervious paver design took advantage of new South Florida Water Management (SFWMD) policies and reduced site run-off. Bayshore Park in Miami Beach sets precedent in the City by promoting sustainable management practices. The purpose is to create a park of natural beauty for community enjoyment and enrichment, reflecting the City’s culture and ecology while serving as a model of sustainability, stewardship, and resilience. Coastal Systems is designing the resiliency functionality and sustainable elements that can be incorporated into the community park to treat stormwater runoff for the surrounding neighborhood watershed, such as onsite water storage and pretreatment. The drainage system design incorporates green infrastructure and a 3-acre lake for retention capacities that consider higher water tables associated with sea level rise predictions. In the Capri South Beach project, Coastal Systems provided streetscape design services to improve the right-of-way for 16th Street and Lincoln Terrace street ends. Both street ends were low in elevation, adjacent to the bay and presented challenges for the drainage design. Several options were evaluated and an inverted-crown configuration for the street ends was selected. The drainage improvements included a design combination of a gravity system, stormwater pump stations and outfall structures. The improvements prevent bay water from back flowing into the streets and protect the bay bottom from disturbance. Standards were developed in the City Right-Of-Way for outfalls to the bay that include a structure to conceal these large Tideflex valves. These check valves, along with the pumping system, were designed to facilitate stormwater management for the City. The resulting design – outfall August 18, 2020 Professional Consulting Services City of Sunny Isles Beach RFQ No. 20-07-01 Page 20 connection structure with Tideflex valve along with pump station – is currently the City of Miami Beach Standard. Marine / Coastal Engineering: Coastal Systems conducted a coastal process analysis of the City of Sunny Isles Beach’s shoreline to determine the anticipated volume of erosion that the City would experience over time, the frequency of projected beach nourishment events required, and the most cost- effective coastal structures to prevent further downdrift. Similar services were provided for Palm Beach County, for 40 miles of coastline. In addition, the team has provided shoreline and upland design, environmental permitting, and construction administration services for various waterfront developments. As the prime consultant, Coastal Systems designed the Maurice Gibb Memorial Park project for the City of Miami Beach. The 2-acre park project includes overwater public access structures, a living shoreline with mangrove planters, and improved storm surge protection barriers, designed to protect the park and adjacent neighborhood from various return interval storms. The project is jointly funded by the Florida Inlet Navigation District (FIND) and the City of Miami Beach General Obligation Bond (GOB). Our team also provided services for the design and improvements for Rickenbacker Causeway Recreational Corridor in Miami-Dade County. Coastal Systems provided field investigations, environmental permitting, coastal and civil engineering design and construction administration services for 2.5 miles of recreational shoreline. An off-shore outfall box structure was designed to discharge upland storm overflow into the bay, while protecting the shoreline and marine life. This structure, protected by rock revetment, is designed to break down the energy of the stormwater and discharge though several weep holes and a submerged open grate. The material is a prefab concrete structure, heavy enough to remain undisturbed and light enough to facilitate installation. The bay water flushes in and out through the stone armor, which is inaccessible to manatees. The open grate (non-corrosive material) flushes water out during high tide and is also used for inspection and maintenance purposes. Sea Level Rise & Resilient Design: In the production of any project design, our team analyzes the various elevations of inundation potential from sea level rise, King Tides, rainfall, and storm surge to ensure the longevity of the project’s viability. Our inclusion of resilient design alternatives from an economic approach sets our team apart, as our considerations are made with the municipal budget in-mind. August 18, 2020 Professional Consulting Services City of Sunny Isles Beach RFQ No. 20-07-01 Page 21 Recently, Coastal Systems completed a Coastal Inundation and Economic Vulnerability Assessment for the Village of Bal Harbour, in which our team utilized our coastal modeling capabilities to provide business-centric recommendations for the Village. This assessment was funded fully by the Florida Department of Environmental Protection (FDEP) Resilient Coastlines Program (RCP). Our team’s assessment analyzed the potential damages to Village-wide infrastructure from sea level rise and storm surge, and projected the increasing annual maintenance costs of the infrastructure to demonstrate the potential increase in operational expenditures. In addition, our team analyzed the potential impacts to real estate values from increased inundation events, and projected the potential impacts to the municipal revenues. Our team reiterated the importance of planning and implanting resilient design strategies today, in order to protect the municipality and its stakeholders. August 18, 2020 Professional Consulting Services City of Sunny Isles Beach RFQ No. 20-07-01 Page 22 Schedules and Resource AllocationSchedules and Resource AllocationSchedules and Resource AllocationSchedules and Resource Allocation Coastal Systems will prioritize the success of any projects with the City of Sunny Isles Beach. Coastal Systems will complete specific project planning, engineering analyses, design, cost and alternative analyses, permitting and construction administration tasks identified by the City on time schedules mutually agreed upon. The time schedules will be dependent on the complexity and legal/technical/regulatory challenges involved in each particular project. Several projects/tasks can be run concurrently, depending on the City’s master implementation schedule and funding structure. Although the potential size and volume of projects that may be generated under this contract is moderate, the Coastal Systems team has sufficient staff resources to dedicate to this contract. City projects will be planned well in advance and our team will be careful to not to stretch our resources so as to maintain excellent client service. We are also able to respond quickly and effectively when emergency or other short-notice projects/tasks arise unexpectedly. We have a proven track record for managing multiple projects and committing necessary resources to meet our clients’ goals. Cost MonitoringCost MonitoringCost MonitoringCost Monitoring Coastal Systems utilizes the Vision accounting system (Vision) to monitor budgets and weekly staff time postings. The project manager is responsible for reviewing and approving all time posted to a project. Vision provides a web-based environment for project accounting, reporting and tracking, providing detailed reports of project progress and budget. The project management reports provide the project manager with real time indicators of percent of fees expended. The project manager can review the budget expended versus the percent of work complete for a particular task. Project invoices are generated directly from the accounting system, and invoices are reviewed by the project manager, with final approval by the Director to ensure consistency and accuracy. Coastal Systems is constantly monitoring materials and labor costs for civil, marine, and other projects on behalf of our clients, and will advise the City if changes in market conditions may affect project construction costs estimates/budgets. 3333 Quali$cation Information andQuali$cation Information andQuali$cation Information andQuali$cation Information and Assigned PersonnelAssigned PersonnelAssigned PersonnelAssigned Personnel ARCHITECT – ENGINEER QUALIFICATIONS PART I – CONTRACT – SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1. TITLE AND LOCATION (City and State) Continuing Professional Consulting Services, Sunny Isles Beach, Florida 2. PUBLIC NOTICE DATE August 11, 2020 3. SOLICITATION OR PROJECT NUMBER RFQ-20-07-01 B. ARCHITECT-ENGINEER POINT OF CONTACT 4. NAME AND TITLE R. Harvey Sasso, P.E., President 5. NAME OF FIRM Coastal Systems International, Inc. 6. TELEPHONE NUMBER (305) 661-3655 7. FAX NUMBER (305) 661-1914 8. E-MAIL ADDRESS rhsasso@coastalsystemsint.com C. PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors.) (Check) 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT PRIME JV PARTNER SUBCON-TRACTOR a. X Coastal Systems International, Inc. 464 South Dixie Highway Coral Gables, Florida 33146 Civil Engineering, Structural Engineering, Environmental Engineering CHECK IF BRANCH OFFICE b. X Ardaman & Associates, Inc. 2608 West 84th Street, Hialeah, Florida 33016 Geotechnical Engineering CHECK IF BRANCH OFFICE f. X Basulto & Associates, Inc. 7179 West 13th Avenue, Hialeah, Florida 33014 Mechanical, Electrical and Plumbing Engineering CHECK IF BRANCH OFFICE e. X Gallagher Bassett Technical Services, Inc. 701 NW 62nd Avenue, #190, Miami, Florida 33126 Environmental Testing & Assessments CHECK IF BRANCH OFFICE g. X Martinez & Martinez Enterprises, Inc. 7179 West 13th Avenue, Hialeah, Florida 33014 Topographic Surveying CHECK IF BRANCH OFFICE c. X Savino & Miller Design Studio, Inc. 12345 NE 6th Avenue, North Miami, Florida 33161 Landscape Architecture CHECK IF BRANCH OFFICE d. X Traf Tech Engineering, Inc. 8400 North University Drive, Suite #307, Tamarac, Florida 33321 Traffic Engineering CHECK IF BRANCH OFFICE D. ORGANIZATIONAL CHART OF PROPOSED TEAM (Attached in Profile of Consultant) Page 23 Aaron Boehning (CS) Pedro Martinez (M) Sandra Rahman (CS) • Hydrographic Surveying • Marine Resource Surveying • Shoreline Surveying • Topographic Surveying • Submerged Lands Lease Surveying • Bathymetric Mapping • Marine Resource Mapping • Geographic Information Systems Surveying / Geographic Surveying / Geographic Surveying / Geographic Surveying / Geographic Information System (GIS) Information System (GIS) Information System (GIS) Information System (GIS) AnalysisAnalysisAnalysisAnalysis Evelio Horta, PhD, P.E., G.E.(AA) • Vibracore Soil Sampling • Geotechnical Testing Barry R. Miller, ASLA (S) Adriana Savino-Miller, DBPR (S) • Landscape Design Landscape ArchitectureLandscape ArchitectureLandscape ArchitectureLandscape Architecture Megan Reising (CS) Taylor Scheuermann (CS) Craig C. Clevenger, P.G. (G) Adam B. Brosius (G) • Environmental Resource Permitting • CCCL Permitting • Project Impact Minimization • Mitigation Planning and Design • Permit Administration • Biological Monitoring • Grant Application Preparation • FEMA services • NPDES Permitting • Research Grant Funding Opportunities • Environmental Testing • Environmental Remediation • Contamination Assessment Environmental Permitting/Environmental Permitting/Environmental Permitting/Environmental Permitting/ Environmental AssessmentsEnvironmental AssessmentsEnvironmental AssessmentsEnvironmental Assessments Geotechnical Geotechnical Geotechnical Geotechnical EngineeringEngineeringEngineeringEngineering Orestes Betancourt (CS) Mahsa Kamali (CS) Demar Woodson (CS) Carl Reyes (CS) Emily Prosser (CS) • Paving • Grading • Drainage/Stormwater Improvements • Roadway & Drainage Design • Site Planning • Streetscape • Construction Administration • Water Service • Sanitary Sewer Service • Public Waterfront Improvements • Marine Structures • Plans/Specifications • Construction Cost Estimation • Stormwater Management and Modeling • Inundation Modeling Civil / Marine Civil / Marine Civil / Marine Civil / Marine EngineeringEngineeringEngineeringEngineering Coastal Systems International (CS) Ardaman & Associates (AA) Basulto & Associates (B) Gallagher Bassett Technical Services (G) Martinez & Martinez (M) Savino & Miller Design Studio (S) Traf Tech Engineering (T) LegendLegendLegendLegend Joaquin E. Vargas, P.E. (T) • Transportation Engineering • Construction Management • Roadway Design Platforms • Traffic, Highway, and Transit Data Collection Tra"c EngineeringTra"c EngineeringTra"c EngineeringTra"c Engineering R. Harvey Sasso, P.E.R. Harvey Sasso, P.E.R. Harvey Sasso, P.E.R. Harvey Sasso, P.E. PrincipalPrincipalPrincipalPrincipal----inininin----ChargeChargeChargeCharge Andres Perez, P.E.Andres Perez, P.E.Andres Perez, P.E.Andres Perez, P.E. Project ManagerProject ManagerProject ManagerProject Manager Rene I. Basulto, P.E., C.G., B.N., P.X. (B) Charles T. Yost, P.X., B.N. (B) • Mechanical Engineering • Electrical Engineering • Plumbing Engineering MEP EngineeringMEP EngineeringMEP EngineeringMEP Engineering Page 24 c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Bal Harbour Jogging Path, Bal HarbourBal Harbour Jogging Path, Bal HarbourBal Harbour Jogging Path, Bal HarbourBal Harbour Jogging Path, Bal Harbour, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2002 2002 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Design, permitting, bidding and construction management of jogging path relocation and dune restoration. Managed demolition of existing eroded jogging path, and removal of non-native invasive vegetation from beach dune system. d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Beachwalk I, Miami BeachBeachwalk I, Miami BeachBeachwalk I, Miami BeachBeachwalk I, Miami Beach, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2002 2002 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Design, permitting, public engagement and construction administration services of on-grade paver block walkway, connecting Lummus Park to 21st St. e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Bill Baggs Cape Florida State Park, Key BiscayneBill Baggs Cape Florida State Park, Key BiscayneBill Baggs Cape Florida State Park, Key BiscayneBill Baggs Cape Florida State Park, Key Biscayne, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 1996 1996 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Design and permitting of 4000 ft of seawall revetment with fishing piers for public access. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE R. Harvey Sasso, P.E.R. Harvey Sasso, P.E.R. Harvey Sasso, P.E.R. Harvey Sasso, P.E. PrincipalPrincipalPrincipalPrincipal----inininin----ChargeChargeChargeCharge a. TOTAL b. WITH CURRENT FIRM 36 25 15. FIRM NAME AND LOCATION (City and State) Coastal Systems International, Coral Gables, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Engineer – FL Master of Science, Civil Engineering, Queen’s University Bachelor of Science, Civil Engineering, Queen’s University 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Founding Partner Harvey Sasso brings over 36 years of demonstrated commitment to the engineering of coastal and waterfront projects throughout Florida and the Caribbean. As a professional coastal engineer, Harvey possesses expertise in coastal planning, beach management, and waterfront development. Harvey has a reputation for providing a business-oriented approach to engineering solutions, with decades of planning, designing, and implementing numerous coastal/waterfront development projects throughout Florida and the Caribbean. Harvey has been involved in all aspects of coastal/marine projects, including project design, engineering analysis, environmental permitting, and the legal, political, and managerial elements of project implementation. Harvey has led teams for a number of public projects, including the Coastal Inundation and Economic Vulnerability Study for Bal Harbour Village, which was made possible through a grant funded by the Florida Department of Environmental Protection’s Resilient Coastlines Program, acquired by Coastal Systems. With extensive experience and expertise in coastal planning, he understands the significance of resilience, feasibility, construction costs, public outreach, and economic assessment relative to engineering design – especially in light of ever-increasing challenges associated with climate change and sea level rise. His years of experience within the coastal environment has allowed him to serve as a speaker at the 2019 Florida Climate Change Compact, addressing Resiliency and Economic Impacts of Climate Change. Harvey is routinely incorporating resiliency and sustainability elements into his projects. Harvey was part of the team collaborating with the City of Miami Beach on their Historic District Resiliency & Adaptation Guidelines, providing his coastal engineering expertise, predicting flood impacts from hurricane storm surge, sea level rise and rainfall flooding under present and future conditions. His interest in economics and financing complements his coastal engineering design capabilities when making critical development decisions during a project’s early stages. Specifically, he believes each coastal project must consider resiliency as applied not just to the project’s own longevity, but also to assess flood protection benefits to surrounding developments. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED 32323232ndndndnd Street Hotspots, Miami BeachStreet Hotspots, Miami BeachStreet Hotspots, Miami BeachStreet Hotspots, Miami Beach, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2001 2002 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Coastal engineering and numerical modeling for coastal breakwaters and sand recycling project to stabilize shoreline at hot spot erosional area. b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Baker’s Haulover Inlet, Bal HarbourBaker’s Haulover Inlet, Bal HarbourBaker’s Haulover Inlet, Bal HarbourBaker’s Haulover Inlet, Bal Harbour, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2002 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Analyzed over 20 years of data relating to the Inlet and adjacent beaches to evaluate the performance of the Inlet, its impact on adjacent beaches and performance of the historical inlet management strategy. Page 25 f. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Coastal Inundation & Economic Vulnerability Study, Bal Coastal Inundation & Economic Vulnerability Study, Bal Coastal Inundation & Economic Vulnerability Study, Bal Coastal Inundation & Economic Vulnerability Study, Bal HarbourHarbourHarbourHarbour, Florida , Florida , Florida , Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2020 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Assessment of Village’s vulnerability to sea level rise and storm surge. Performing economic impact assessment of the cost of “doing nothing.” Obtained grant from FDEP Resilient Coastlines Program. g. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Dinner Key Marina, MiamiDinner Key Marina, MiamiDinner Key Marina, MiamiDinner Key Marina, Miami, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 1999 1999 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Design and environmental permitting for 110-slip marina and 600-foot bulkhead replacement. Mitigation design provided and maintenance dredging designed. h. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Ft. Zachary Taylor State Park Breakwaters, Key WestFt. Zachary Taylor State Park Breakwaters, Key WestFt. Zachary Taylor State Park Breakwaters, Key WestFt. Zachary Taylor State Park Breakwaters, Key West, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present 2007 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Coastal engineering design and environmental permitting for breakwaters, jetties, and beach fill project for shoreline protection at park. i. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Historic District Historic District Historic District Historic District Resiliency & Adaptation Guidelines, Miami Resiliency & Adaptation Guidelines, Miami Resiliency & Adaptation Guidelines, Miami Resiliency & Adaptation Guidelines, Miami BeachBeachBeachBeach, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2019 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Developed guidelines and regulations for the renovation, raising, and/or re-purposing of historic structures in low-lying areas of Miami Beach that are vulnerable to ongoing/increasing tidal flooding and long-term impacts of sea level rise j. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Miamarina, MiamiMiamarina, MiamiMiamarina, MiamiMiamarina, Miami, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 1996 1997 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Design and environmental permitting for 130-slip marina. Coastal engineering design including numerical modeling and physical model tests were conducted for the wave baffle design. k. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Palm Beach County Regional Sediment BudgetPalm Beach County Regional Sediment BudgetPalm Beach County Regional Sediment BudgetPalm Beach County Regional Sediment Budget, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Ongoing N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Providing coastal engineering services to develop a regional sediment budget for the County’s shoreline. Cost of historical beach nourishment documented. Conducted assessment of cost-sharing associated with county-wide beach management against benefits to individual stakeholders. l. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Peanut Island Environmental Restoration, Palm Beach CountyPeanut Island Environmental Restoration, Palm Beach CountyPeanut Island Environmental Restoration, Palm Beach CountyPeanut Island Environmental Restoration, Palm Beach County, , , , FloridaFloridaFloridaFlorida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2003 2005 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Coastal/civil and marine structures design for 1.5-acre artificial reef habitat and 1.3-acre shallow seagrass lagoon. Design of tidal pond and flushing channel, shallow-draft marina with floating docks, pedestrian boardwalks, and site utility upgrades. m. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Sunny Isles Beach ManagementSunny Isles Beach ManagementSunny Isles Beach ManagementSunny Isles Beach Management, , , , Sunny Isles Beach, Sunny Isles Beach, Sunny Isles Beach, Sunny Isles Beach, Florida Florida Florida Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2012 2012 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Provided coastal engineering services to evaluate the City’s shoreline stabilization. Conducted an analysis of coastal processes and provided recommendations for longer-term solutions to beach nourishment projects. n. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Village of Key Biscayne Beach NourishmentVillage of Key Biscayne Beach NourishmentVillage of Key Biscayne Beach NourishmentVillage of Key Biscayne Beach Nourishment, Florida , Florida , Florida , Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2012 2012 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Coastal engineering and environmental permitting for 120,000 cy beach fill project. Marine resource and hydrographic surveys conducted, along with sand source search, jet probes, vibracores, and marine archeological surveys. Page 26 c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Capri South Beach, Miami Beach, FloridaCapri South Beach, Miami Beach, FloridaCapri South Beach, Miami Beach, FloridaCapri South Beach, Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2009 2009 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Paving, grading and drainage design for 3 residential complexes with a total 72 units and an underground parking garage next to Biscayne Bay, covering two city blocks. Design included water main extensions for each street, fire, sanitary services, street ends and storm drainage system improvement for the neighborhood with associated pump stations. d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Currie Park, West Palm BeachCurrie Park, West Palm BeachCurrie Park, West Palm BeachCurrie Park, West Palm Beach, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2019 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Marine engineering and environmental consulting services for design of staging dock, deteriorated boat ramp and maintenance dredging. e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Haulover Marine Center, North Miami Beach, FloridaHaulover Marine Center, North Miami Beach, FloridaHaulover Marine Center, North Miami Beach, FloridaHaulover Marine Center, North Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2016 2016 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Andres Perez, P.E.Andres Perez, P.E.Andres Perez, P.E.Andres Perez, P.E. DirectorDirectorDirectorDirector a. TOTAL b. WITH CURRENT FIRM 21 20 15. FIRM NAME AND LOCATION (City and State) Coastal Systems International, Coral Gables, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Engineer – FL Bachelor of Science, Civil Engineering, Florida International University 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Andres Perez, with over 20 years of civil engineering experience in Florida and throughout the Caribbean, serves as Director. Andres has led multi-faceted project teams in the engineering design for public developments such as parks, corridors, commercial properties, roadways, streetscape and Right-of-Way. His experience in site development in South Florida and within Miami Beach include design of paving, grading, drainage, various utilities, including water and sewer. Andres utilizes his experience in project management to coordinate with clients’ Project Managers and lead a design team to execute clients’ vision. His experience encompasses the planning, design and construction administration for site/civil projects. His site/civil experience in Florida also includes the permitting of projects through agencies such as the Florida Department of Environmental Protection (FDEP), South Florida Water Management District, and Florida Department of Transportation. Andres has processed stormwater management designs through these agencies to obtain Coastal Construction Control Line Permits (CCCL), Environmental Resource Permits (ERP), requiring extensive experience with projects adjacent to the coast and/or waterfront. These projects have required coordination with diverse project teams to design systems that meet the development programming goals for both public and private sector clients and the stringent regulatory permitting criteria to manage surface water runoff. AAAAwardswardswardswards:::: Maurice A. Ferré Park, Miami, FL – American Society of Civil Engineers – Civil Engineering Project of the Year (2014- 2015) Miracle Mile & Giralda Ave. Streetscape, Coral Gables, FL – Cuban American Association of Civil Engineers – Project of the Year (2019) 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Bayshore Park, Bayshore Park, Bayshore Park, Bayshore Park, Miami Beach, FloridaMiami Beach, FloridaMiami Beach, FloridaMiami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Providing site civil engineering and environmental permitting services for proposed 20-acre park comprised of lake, walking trails, boardwalks and promenade. Lake design incorporates the treatment of stormwater runoff for surrounding neighborhood. b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Beachwalk II, Miami Beach, FloridaBeachwalk II, Miami Beach, FloridaBeachwalk II, Miami Beach, FloridaBeachwalk II, Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2019 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Civil/coastal engineering design and environmental permitting for on-grade paver walkway that connects South Pointe Park, Marjory Stoneman Douglas Park, and Lummus Park in the South Beach district of Miami Beach. Page 27 Marine and site/civil improvements for the redevelopment of a new marina facility with approximately 400 feet of bulkhead. Surveying, water and sanitary sewer design, utility coordination, and construction administration services provided. Redesigned sheet pile bulkhead with augercastpile-supported reinforced concrete forklift launching platform. f. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Island Gardens Mega Yacht Harbour, Miami, Florida Island Gardens Mega Yacht Harbour, Miami, Florida Island Gardens Mega Yacht Harbour, Miami, Florida Island Gardens Mega Yacht Harbour, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2015 2015 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Marina design and environmental permitting for 50-slip megayacht harbor on Watson Island as part of $600M site redevelopment. Hydrographic and marine resource surveys and underwater bulkhead assessments provided. Design of dredging, mitigation, fixed piers, and utilities for vessels up to 450 feet long. g. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Jose Marti Park, MiamiJose Marti Park, MiamiJose Marti Park, MiamiJose Marti Park, Miami,,,, Florida Florida Florida Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2008 2008 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Site/civil engineering for 1-acre project site development with a community gymnasium. Paving, grading and stormwater management designs were completed and water/sewer services were provided to the site. Street improvements were designed for South West 5th Street. h. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Kennedy Park Shoreline Stabilization, Miami, Florida Kennedy Park Shoreline Stabilization, Miami, Florida Kennedy Park Shoreline Stabilization, Miami, Florida Kennedy Park Shoreline Stabilization, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2012 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Design and environmental permitting for a shoreline stabilization and enhancement project. Conducted detailed mangrove and upland vegetation and topographic surveys to determine areas in need of enhancement and placement of view corridors. Improving shoreline at existing passive use park to include exotic removal, stabilizing shoreline with native vegetation and properly permitted natural shoreline stabilization and creation of public view corridors through key locations within densely vegetated mangrove fringe. i. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Maurice A. Ferré Park, Miami, FloridaMaurice A. Ferré Park, Miami, FloridaMaurice A. Ferré Park, Miami, FloridaMaurice A. Ferré Park, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2018 2018 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Civil engineering design and permitting for 24-acre bayfront park. Design included a stormwater management system that combines drainage wells with exfiltration trenches along with retention areas and water/sewer services. j. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Maurice Gibb Memorial Park, Miami Beach, Florida Maurice Gibb Memorial Park, Miami Beach, Florida Maurice Gibb Memorial Park, Miami Beach, Florida Maurice Gibb Memorial Park, Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Design, planning, permitting of 2-acre waterfront park. Design elements include living shoreline, seawall, overwater viewing platform and MONSTRUM playground. Led public workshops in coordination with City. k. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Miracle Mile & Giralda Avenue Streetscape, Coral Gables, Miracle Mile & Giralda Avenue Streetscape, Coral Gables, Miracle Mile & Giralda Avenue Streetscape, Coral Gables, Miracle Mile & Giralda Avenue Streetscape, Coral Gables, FloridaFloridaFloridaFlorida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2019 2018 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Civil engineering, stormwater management and permitting services for 11.5 acres of streetscape in downtown Coral Gables. l. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED North Beach Recreational Corridor (NBRC) North Beach Recreational Corridor (NBRC) North Beach Recreational Corridor (NBRC) North Beach Recreational Corridor (NBRC) –––– Miami BeachMiami BeachMiami BeachMiami Beach, , , , Florida Florida Florida Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2009 2009 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project Manager, Site/Civil engineering services include paving and grading for 6,700 LF of a $6M multi-purpose public access corridor to traverse along the western edge of the beach dunes between 64th Street and 79th Street. Design includes dune enhancements, landscaping, electrical and water service for irrigation. m. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Rickenbacker Causeway North Hobie Beach, MiamiRickenbacker Causeway North Hobie Beach, MiamiRickenbacker Causeway North Hobie Beach, MiamiRickenbacker Causeway North Hobie Beach, Miami----Dade Dade Dade Dade County, FloridaCounty, FloridaCounty, FloridaCounty, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Civil/coastal design for recreational development involving 9.6 acres of shoreline stabilization and upland facility. New parking lot and roadway and excavation/fill activities, stormwater improvements, sheet pile installation, retaining walls, beach access, revetment and jetties. n. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED South Pointe Park, Miami Beach, FloridaSouth Pointe Park, Miami Beach, FloridaSouth Pointe Park, Miami Beach, FloridaSouth Pointe Park, Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2009 2009 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Civil design and coastal/environmental permitting of a multi-purpose recreational park area for structural, hardscape, and landscape improvements in excess of 16 acres. Activities include the construction of a main park structure with offices/concession/restrooms, a storage facility for park vehicles, a raised serpentine walkway, and playground facilities. Page 28 c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Bayshore Park, Miami Beach, FloridaBayshore Park, Miami Beach, FloridaBayshore Park, Miami Beach, FloridaBayshore Park, Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Providing site civil engineering and environmental permitting services for proposed 20-acre park comprised of lake, walking trails, boardwalks and promenade. Lake design incorporates the treatment of stormwater runoff for surrounding neighborhood. d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED BeachwalkBeachwalkBeachwalkBeachwalk IIIIIIII, , , , Miami Beach, FloridaMiami Beach, FloridaMiami Beach, FloridaMiami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2019 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Civil/coastal engineering design and environmental permitting for on-grade paver walkway connecting South Pointe Park, Marjory Stoneman Douglas Park, and Lummus Park in South Beach district of Miami Beach. e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Capri South Beach, Miami Beach Capri South Beach, Miami Beach Capri South Beach, Miami Beach Capri South Beach, Miami Beach PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2008 2008 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Paving, grading and drainage design for 3 residential complexes and underground parking garage next to Biscayne Bay, covering two city blocks. Design of water main extensions for each street, fire, sanitary services, street ends and storm drainage system improvement for the neighborhood with associated pump stations. f. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Jose Marti Park, Miami, Florida Jose Marti Park, Miami, Florida Jose Marti Park, Miami, Florida Jose Marti Park, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2008 2008 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Orestes BetancourtOrestes BetancourtOrestes BetancourtOrestes Betancourt Civil DesignerCivil DesignerCivil DesignerCivil Designer a. TOTAL b. WITH CURRENT FIRM 35 30 15. FIRM NAME AND LOCATION (City and State) Coastal Systems International, Coral Gables, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Bachelor of Arts, Construction Management, Florida International University, 1988 Associate in Arts, Engineering, Miami-Dade Community College, 1983 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Orestes Betancourt, with over 35 years of experience in site/civil engineering, serves as the firm’s Senior Civil Designer. He has completed projects for a variety of sites including parks, public open spaces, hotels, condominiums, marinas and resorts. Orestes’ experience is concentrated in South Florida with a majority of his work within the City of Miami Beach. He regularly leads and/or coordinates with other project consultants including landscape architects, geotechnical engineers and irrigation consultants to ensure consistent site/civil design with project requirements. Orestes’ site/civil experience also includes designs for water service and distribution systems, sanitary sewer collection, paving, grading, and stormwater management designs. His stormwater management design experience includes the use of best management practices with innovative systems tailored to the specific site conditions, including high water tables and anticipated sea level rise predictions to ensure future performance. Orestes’ background in construction, allows him to provide exceptional construction administration services associated with site civil and utility projects. Orestes works side-by-side with City staff and project managers to conduct inspections and serving as a liaison between the City and the contractors to ensure the project is completed in accordance with the strict environmental conditions, design plans and specifications. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED 10th Street 10th Street 10th Street 10th Street AuditoriumAuditoriumAuditoriumAuditorium, , , , Miami Beach, FloridaMiami Beach, FloridaMiami Beach, FloridaMiami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2009 2009 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Civil design and environmental permitting for the City of Miami Beach's 10th Street Auditorium and Beach Patrol Headquarters. The $6.25M design included restoration of the two buildings to include new water and sewer service, as well as connections to the adjacent public restrooms. b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Bayfront Street Ends ImprovementsBayfront Street Ends ImprovementsBayfront Street Ends ImprovementsBayfront Street Ends Improvements, , , , Miami Beach, FloridaMiami Beach, FloridaMiami Beach, FloridaMiami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2006 2015 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Bulkhead design and environmental permitting for street ends at South Shore Drive, 10th Street, 14th Street, Lincoln Road as well as Island View Park. Streetscape design for street ends at South Shore Drive, 10th Street and Lincoln Road to improve upland access to the waterfront. Paving, grading, drainage lighting and landscape/hardscape improvements. Page 29 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Site/civil engineering for 1-acre project site development with a community gymnasium. Paving, grading and stormwater management designs were completed and water/sewer services were provided to the site. Street improvements were designed for South West 5th Street. g. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Little Haiti Cultural Center, Miami, FloridaLittle Haiti Cultural Center, Miami, FloridaLittle Haiti Cultural Center, Miami, FloridaLittle Haiti Cultural Center, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2008 2008 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Site/civil engineering for a 1.5 acre site development with a cultural center and theater. Paving, grading and stormwater management designs were completed and water/sewer services were provided to the site including a water main extension. Street improvements were designed along with three (3) parking lots totaling 180 spaces. h. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Maurice Gibb Memorial Park, Miami BeachMaurice Gibb Memorial Park, Miami BeachMaurice Gibb Memorial Park, Miami BeachMaurice Gibb Memorial Park, Miami Beach PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Civil design, planning and permitting of 2-acre waterfront park. Design elements include living shoreline, seawall, overwater viewing platform and MONSTRUM playground. i. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Miami DDA Miami DDA Miami DDA Miami DDA BaywalkBaywalkBaywalkBaywalk----Riverwalk, MiamiRiverwalk, MiamiRiverwalk, MiamiRiverwalk, Miami, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2019 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Developed design guidelines for seawalls, living shorelines and civil engineering (paving and drainage) for a proposed pedestrian path along Biscayne Bay. Developed a statement of costs and finalized an implementation plan of unifying elements and maintenance strategy. j. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Miracle Mile & Giralda Ave. Streetscape, Coral GablesMiracle Mile & Giralda Ave. Streetscape, Coral GablesMiracle Mile & Giralda Ave. Streetscape, Coral GablesMiracle Mile & Giralda Ave. Streetscape, Coral Gables, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2019 2018 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Civil engineering, stormwater management and permitting services for 11.5 acres of streetscape in downtown Coral Gables. k. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED North Beach Recreational Corridor (NBRC), Miami BeachNorth Beach Recreational Corridor (NBRC), Miami BeachNorth Beach Recreational Corridor (NBRC), Miami BeachNorth Beach Recreational Corridor (NBRC), Miami Beach, , , , FloridaFloridaFloridaFlorida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2009 2009 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Design and environmental permitting of multi-purpose public access corridor to traverse along the western edge of the beach dunes between 64th Street and 79th Street. Design encompasses 15 blocks and three city parks. l. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Rickenbacker Causeway Recreational Corridor, MiamiRickenbacker Causeway Recreational Corridor, MiamiRickenbacker Causeway Recreational Corridor, MiamiRickenbacker Causeway Recreational Corridor, Miami----Dade Dade Dade Dade CountyCountyCountyCounty, Florida , Florida , Florida , Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2011 2011 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Design of shoreline stabilization and associated public recreation area improvements along 2.5 miles of shoreline. Marine resource and hydrographic surveys completed, and coastal engineering analysis conducted to assess design wave conditions, sediment transport and optimum shoreline stabilization methods. Design elements included landscaping, invasive species removal with native species restoration, parking improvements, stormwater management and vendor kiosks for waterfront activities. m. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Soundscape Park, Miami BeachSoundscape Park, Miami BeachSoundscape Park, Miami BeachSoundscape Park, Miami Beach, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2011 2011 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Provided site/civil engineering services as part of the design team led by West 8. Completed stormwater management design and processed Class II permit through Miami-Dade County DERM. Water and sanitary sewer services were designed. n. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED South Pointe Park, Miami Beach, FloridaSouth Pointe Park, Miami Beach, FloridaSouth Pointe Park, Miami Beach, FloridaSouth Pointe Park, Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2009 2009 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Civil design and coastal/environmental permitting of a multi-purpose recreational park area for structural, hardscape, and landscape improvements for 19 acres. Services included construction of a main park structure with offices/concession/restrooms, a storage facility for park vehicles, a raised serpentine walkway, and playground facilities. Page 30 a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED 120 Salamanca Avenue, Coral Gables120 Salamanca Avenue, Coral Gables120 Salamanca Avenue, Coral Gables120 Salamanca Avenue, Coral Gables,,,, FloridaFloridaFloridaFlorida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project management and inspection services for development’s revised domestic water meter services plan. Resubmittal to Miami-Dade County Department of Water and Sewer (WASD) for review to approve domestic water supply connections to service seven condominium residences. Miami-Dade County Department of Transportation and Public Works permit processed. b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED 1755 Meridian Avenue Multi1755 Meridian Avenue Multi1755 Meridian Avenue Multi1755 Meridian Avenue Multi----Purpose Municipal Parking Purpose Municipal Parking Purpose Municipal Parking Purpose Municipal Parking Facility, Miami BeachFacility, Miami BeachFacility, Miami BeachFacility, Miami Beach, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2011 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Managed right-of-way inspections for improving onsite drainage connection to existing city stormwater system. Provided review for specialty permit for equipment and material staging within the city’s right-of-way and reviewed plans for permit compliance. Processed and released Public Works Right-of-Way Permit to City awarded Contractor. c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Adrienne Arsht Center, MiamiAdrienne Arsht Center, MiamiAdrienne Arsht Center, MiamiAdrienne Arsht Center, Miami,,,, FloridaFloridaFloridaFlorida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Provided bidding process services for stormwater improvements at site, including addition of one drainage well, piping and pavement restoration. d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Bayfront Park Lighting, MiamiBayfront Park Lighting, MiamiBayfront Park Lighting, MiamiBayfront Park Lighting, Miami,,,, FloridaFloridaFloridaFlorida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2019 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Provided construction management services for LED lighting installation at waterfront park. Completed weekly field inspections involving documenting contractor’s installation processes for 36 Louis Poulsen LED light poles, foundation bases and handhold boxes. Monitored contractor’s work schedule to achieve target completion date. Provided client with weekly field observation reports of project progress. e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Biscayne Point RightBiscayne Point RightBiscayne Point RightBiscayne Point Right----ofofofof----Way Improvements, Miami BeachWay Improvements, Miami BeachWay Improvements, Miami BeachWay Improvements, Miami Beach, , , , FloridaFloridaFloridaFlorida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2012 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Demar WoodsonDemar WoodsonDemar WoodsonDemar Woodson Senior Project ManagerSenior Project ManagerSenior Project ManagerSenior Project Manager a. TOTAL b. WITH CURRENT FIRM 31 2 15. FIRM NAME AND LOCATION (City and State) Coastal Systems International, Coral Gables, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Bachelor of Science, Construction Engineering, Florida International University, Miami, Florida, 1987 Associate in Science, Construction Engineering, Miami Dade Community College, Miami Florida, 1984 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Demar Woodson has over 31 years of construction engineering experience, which involve completing and managing public works right-of-way projects. Demar has participated in a variety of projects including plan reviews and the design and production of construction drawings for water and sanitary sewer service connections. Demar has also processed permits through multiple regulatory agencies such as Florida Department of Transportation (FDOT), Department of Health (DOH), Miami-Dade County Department of Regulatory and Economic Resources (RER), Florida Department of Environmental Protection (FDEP), and the U.S Army Corps of Engineers (USACE). Demar has considerable supervisory and management experience in the construction of public works projects and facilities, including planning and zoning variances, impacts adjacent to the public right-of-way at private property lines, and coastal and beach revitalization improvements. As Right-of-Way Manager for the City of Miami Beach, Demar managed the plan review of diverse projects for compliance with local, state and federal regulatory agencies and processed permit applications for proposed utility installations. He also supervised inspections for capital improvements projects, including public and private water and sanitary sewer mains installations, streets and street lighting construction, roadway construction, storm drainage systems, and Miami Beach’s city-wide stormwater pump stations construction improvements. 19. RELEVANT PROJECTS Page 31 Reviewed plans for permit compliance. Processed and released Public Works Right-of-Way Permit to city-awarded contractor. Managed right-of-way inspections throughout Biscayne Point Island, Biscayne Beach and Stillwater Drive sub- neighborhoods, which involved water main and service replacement, stormwater drainage installation, roadway reconstruction replacement of subbase, sidewalk replacement, curb and gutter installation, decorative street lighting, landscaping and irrigation service connection. f. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED North Shore Dickens Avenue American Recovery Reinvestment North Shore Dickens Avenue American Recovery Reinvestment North Shore Dickens Avenue American Recovery Reinvestment North Shore Dickens Avenue American Recovery Reinvestment Act, Miami BeachAct, Miami BeachAct, Miami BeachAct, Miami Beach, Florida , Florida , Florida , Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2011 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Managed right-of-way inspections involving milling and resurfacing, constructing new sidewalks, curb and gutters at site- specific locations, constructing paver crosswalks and building landscape bulb-outs, and restriping and signage for bike lane. Reviewed and approved irrigation water service connection. Reviewed plans for permit compliance. Processed and released Public Works Right-of-Way Permit to city-awarded Contractor. g. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Natiivo, MiamiNatiivo, MiamiNatiivo, MiamiNatiivo, Miami, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Ongoing N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Civil engineering and environmental permitting for proposed high-rise development, consisting of 192 hotel rooms, 412 apartments, 136,396 sf of office space and 8,260 sf of retail space. Provided inspection services for water and sanitary sewer facilities plan review and assisted in processing permits through Miami-Dade County Department of Water and Sewer (WASD). h. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Parco Mare, Dania BeachParco Mare, Dania BeachParco Mare, Dania BeachParco Mare, Dania Beach, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present Present (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Provided inspection services for construction of a hotel/lodge with parking within 2.17 acres of land that includes .81 acre of jurisdictional wetlands. On-site mitigation of restoring and enhancing existing wetland. i. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED South Pointe Crosswalks, Miami BeachSouth Pointe Crosswalks, Miami BeachSouth Pointe Crosswalks, Miami BeachSouth Pointe Crosswalks, Miami Beach PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2012 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Managed right-of-way inspections for the construction of new brick paver crosswalk in the South Pointe neighborhood of Miami Beach. Reviewed and approved irrigation water service connection for the landscape improvements. Reviewed plans for permit compliance. Processed and released Public Works Right-of-Way Permit to city-awarded contractor. j. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Vizcaya of Kendall Community Development District, KendallVizcaya of Kendall Community Development District, KendallVizcaya of Kendall Community Development District, KendallVizcaya of Kendall Community Development District, Kendall, , , , FloridaFloridaFloridaFlorida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2018 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project management services for proposed traffic calming enhancement improvements, which included radar speed check signs, Rectangular Rapid Flashing Beacons (RRFB), speed humps, and pavement striping at crosswalks. Attended Board of Supervisors monthly meetings to advise on status of Miami-Dade County plan review processes. k. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED William’s Island Marina, AventuraWilliam’s Island Marina, AventuraWilliam’s Island Marina, AventuraWilliam’s Island Marina, Aventura, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present Present (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Provided construction administration services for marina improvements consisting of installation of 338 lf of 4’ HDPE fire line suppression and redesign of 18 slips. Designed the extension of the concrete base and access platform. Page 32 b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Antonio Maceo Park, Miami, Florida Antonio Maceo Park, Miami, Florida Antonio Maceo Park, Miami, Florida Antonio Maceo Park, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2018 2018 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Conducted a benthic survey in order to obtain an ERP for improvements to existing dock structure. Provide assistance in preparing the permit application for submittal to Miami-Dade and the FDEP. c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Artificial Reef Artificial Reef Artificial Reef Artificial Reef Monitoring, Miami, FloridaMonitoring, Miami, FloridaMonitoring, Miami, FloridaMonitoring, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2019 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Conducted scientific diving for the post construction monitoring of artificial reefs associated with the Miami Harbor Phase III Federal Channel Expansion Project in accordance with permit compliance. Assist in producing deliverables for client including year three monitoring report. d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Chateau Beach, Sunny Isles BeachChateau Beach, Sunny Isles BeachChateau Beach, Sunny Isles BeachChateau Beach, Sunny Isles Beach, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2013 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Provided marine turtle lighting consultation (including external, emergency, and signage features) for condominium tower, garage and swimming pool. Submitted package for FDEP marine turtle lighting review. e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Megan ReisingMegan ReisingMegan ReisingMegan Reising Sr. Sr. Sr. Sr. Environmental/Permitting Project ManagerEnvironmental/Permitting Project ManagerEnvironmental/Permitting Project ManagerEnvironmental/Permitting Project Manager a. TOTAL b. WITH CURRENT FIRM 8 3 15. FIRM NAME AND LOCATION (City and State) Coastal Systems International, Coral Gables, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Master of Science, Biology, Florida Atlantic University, Boca Raton, Florida, 2013 Bachelor of Science, Ohio State University, Columbus, Ohio, 2011 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Ms. Reising is a skilled environmental project manager with over five years of experience who has worked on marine, coastal, and restoration projects and environmental permit applications at the local, county, state, and federal levels. She has expertise working as a field biologist and managing projects throughout all phases of completion. She has worked with various environmental agencies such as the Florida Fish and Wildlife Conservation Commission (FWC), Florida Department of Environmental Protection (FDEP), and U.S. Army Corps of Engineers (USACE), as well as all local municipalities in Miami-Dade, Broward, and Martin Counties. Ms. Reising has extensive knowledge of marine biology and coastal regulations in Florida and throughout the Caribbean. She has conducted marine benthic resource surveys, seagrass restoration, coral health monitoring and relocation, ecological impact assessments, population monitoring, habitat mapping surveys, and worked with numerous federally listed endangered species. Her areas of focus include coastal and marine site development, specifically project permitting strategy and mitigation. Her regular project management responsibilities include coordination with project teams and regulatory agencies, detailed environmental assessments and mitigation, scientific diving and environmental permit processing. Professional AffiliationsProfessional AffiliationsProfessional AffiliationsProfessional Affiliations:::: The Northwest Association Of Environmental Professionals, The International Sea Turtle Society CertificationsCertificationsCertificationsCertifications:::: PADI Advanced Open Water Diving Certified, 2014, First Aid and CPR 2016 RRRRelevantelevantelevantelevant PPPPublicationsublicationsublicationsublications:::: Reising, M., M. Salmon, and S. Stapleton. (2015) Hawksbill nest site selection affects hatchling survival at a rookery in Antigua, West Indies. Endangered Species Research 29:179-187 Salmon, M. and M. Reising (2014) Emergence rhythms of hatchling marine turtles: Is a time sense involved? Chelonian Conservation and Biology: December 2014, Vol. 13, No 2, pp 282-285 Salmon, M., M. Reising, and S. Stapleton (2016) The evolution of hatchling morphology. Marine Turtle Newsletter No 149, pp 9-12 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED 701 Brickell Avenue701 Brickell Avenue701 Brickell Avenue701 Brickell Avenue, Miami, Florida, Miami, Florida, Miami, Florida, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Environmental permitting and engineering design for proposed multi-slip dock located in the Biscayne Bay Aquatic Preserve. Page 33 Everglades Safari Park, MiamiEverglades Safari Park, MiamiEverglades Safari Park, MiamiEverglades Safari Park, Miami, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Environmental permitting and engineering design of 3-acre park improvements to adapt to water level rise. Design elements include ticket gazebo, waiting area, floating docks, fuel systems, potable water system, parking lot improvements, drainage restoration and pedestrian access bridge. Conducted wetland delineation to facilitate FDEP Environmental Resource Permit, Corps permit, and SFWMD permit. f. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED First Presbyterian Church, Miami, First Presbyterian Church, Miami, First Presbyterian Church, Miami, First Presbyterian Church, Miami, FloridaFloridaFloridaFlorida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2019 Present (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Shoreline stabilization design and environmental permitting of 220 feet of seawall, bulkhead and baywalk. Secured final permits from Miami-Dade, the FDEP, and Corps. Conducted marine resource survey. g. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Hillsboro Inlet Management, Broward CountyHillsboro Inlet Management, Broward CountyHillsboro Inlet Management, Broward CountyHillsboro Inlet Management, Broward County, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Continuing consultation services with District regarding inlet management activities including annual bypass reporting, permitting of jetty improvements, marine resource mapping, coral relocation, and compliance assistance. h. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Kennedy Park, MiamiKennedy Park, MiamiKennedy Park, MiamiKennedy Park, Miami, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2013 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Marine engineering design and environmental permitting of overwater boardwalk replacement. Facilitated permitting applications, processing, and agency compliance. i. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Martin County Artificial Reef Monitoring, Martin County, Florida Martin County Artificial Reef Monitoring, Martin County, Florida Martin County Artificial Reef Monitoring, Martin County, Florida Martin County Artificial Reef Monitoring, Martin County, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2018 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Year one and two biological monitoring of marine resource surveys for five artificial reefs located within Martin County. Conducted fish abundance surveys between 55–90 feet deep, identified all marine resources present, developed Field Observation Report, planned numerous consecutive deep dives, determined durability and stability of the reef, and provided deliverables to client in a timely manner. j. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Maurice Gibb Maurice Gibb Maurice Gibb Maurice Gibb Memorial Park, MiamiMemorial Park, MiamiMemorial Park, MiamiMemorial Park, Miami, Florida Florida Florida Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Conducted marine resource survey and developed Field Observation Report to facilitate FDEP Joint Coastal Permit. k. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Miamarina Pier Improvement, Miami, Florida Miamarina Pier Improvement, Miami, Florida Miamarina Pier Improvement, Miami, Florida Miamarina Pier Improvement, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2019 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Lead Project Manager. Secured all permits. Provided assistance in preparing the permit applications for submittal to the FDEP for an Environmental Resource Permit (ERP). l. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Peacock Park, MiamiPeacock Park, MiamiPeacock Park, MiamiPeacock Park, Miami, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2019 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Environmental permitting, marine engineering design and construction administration for overwater boardwalk replacement. m. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Porsche Tower, Porsche Tower, Porsche Tower, Porsche Tower, Sunny Isles BeachSunny Isles BeachSunny Isles BeachSunny Isles Beach, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2018 2017 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Coordinated and provided assistance to the project’s architect, with regards to sea turtle lighting (including external, emergency, and signage features), for the condominium building. Submitted package for FDEP Marine Turtle Lighting review. Page 34 a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Bayshore Park, Miami Beach, FloridaBayshore Park, Miami Beach, FloridaBayshore Park, Miami Beach, FloridaBayshore Park, Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Providing site civil engineering and environmental permitting services for proposed 20-acre park comprised of lake, walking trails, boardwalks and promenade. Lake design incorporates the treatment of stormwater runoff for surrounding neighborhood. Designed outfalls and conducted stormwater modeling. b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Boca Chica Mooring Field, Monroe CountyBoca Chica Mooring Field, Monroe CountyBoca Chica Mooring Field, Monroe CountyBoca Chica Mooring Field, Monroe County, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Engineering design and environmental permitting for of public mooring field for 40 vessels, ranging 30 - 40 ft, anchored with an eco-mooring device. Design of navigational channel. c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Everglades Safari Park, Miami, FloridaEverglades Safari Park, Miami, FloridaEverglades Safari Park, Miami, FloridaEverglades Safari Park, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Engineering design and environmental permitting of 3-acre park improvements to adapt to water level rise. Design elements include ticket gazebo, waiting area, floating docks, fuel systems, potable water system, parking lot improvements, drainage restoration and pedestrian access bridge. d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED First Presbyterian Church, Miami, FloridaFirst Presbyterian Church, Miami, FloridaFirst Presbyterian Church, Miami, FloridaFirst Presbyterian Church, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2019 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Civil and shoreline stabilization design of baywalk and 220 feet of seawall. e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED James L. James L. James L. James L. Knight Center, MiamiKnight Center, MiamiKnight Center, MiamiKnight Center, Miami, FloridaFloridaFloridaFlorida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Ongoing N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Engineering design and environmental permitting of 500 feet of bulkhead replacement. Design involves a transient docking facility, bumpers and fender piles, and cleat replacements. f. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Maceo Park, MiamiMaceo Park, MiamiMaceo Park, MiamiMaceo Park, Miami, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Ongoing N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Marine engineering design and environmental permitting and for improvements to boat ramp, fixed wooden docks, floating dock, kayak launch, riprap repair and regrading parking lot. g. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Maurice Gibb Memorial Park, Miami Beach, FloridaMaurice Gibb Memorial Park, Miami Beach, FloridaMaurice Gibb Memorial Park, Miami Beach, FloridaMaurice Gibb Memorial Park, Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Carfedlen ReyesCarfedlen ReyesCarfedlen ReyesCarfedlen Reyes Civil EngineerCivil EngineerCivil EngineerCivil Engineer a. TOTAL b. WITH CURRENT FIRM 19 2 15. FIRM NAME AND LOCATION (City and State) Coastal Systems International, Coral Gables, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Bachelor of Science, Civil Engineering, Universidad Santa Maria la Antigua, Panama, 2006 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Carfedlen “Carl” Reyes, with over 19 years of experience in computer-aided design (CAD) for civil, coastal and marine engineering, serves as a CAD Designer and Civil Engineer. He conducts and interprets hydraulic models, and applies the results for water, wastewater and stormwater projects. He regularly provides CAD support to project engineers by conducting coastal process studies, including numerical modeling. He extracts various data sets, bathymetry, and prepares report figures for engineering studies and reports. Carl has extensive experience completing civil works design within the CAD environment utilizing the latest versions of AutoCAD. He has training and experience with the use of AutoCAD Civil 3D to prepare coastal plans, plan/profiles, and to calculate earthworks (cut/fill) for coastal and marine projects. Carl regularly coordinates with other consultants on project teams including mechanical, electrical, landscape/architectural engineers to prepare and compile comprehensive construction documents. He has been responsible for CAD and management of CAD files and drawings for more than $2 billion in civil works projects, both locally and internationally. 19. RELEVANT PROJECTS Page 35 Civil design, planning, permitting of 2-acre waterfront park. Design elements include living shoreline, seawall, overwater viewing platform and MONSTRUM playground. Designed waterfront improvements including bulkhead, overlook and fishing pier. Designed foundation for playground equipment and shade structures. h. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Marine Stadium Marine Stadium Marine Stadium Marine Stadium Restoration, Miami, FloridaRestoration, Miami, FloridaRestoration, Miami, FloridaRestoration, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Civil/marine engineering for repair of existing concrete columns, new pile installation, retaining walls, floating and fixed docks, excavation/fill activities, barge mooring structures and infrastructure design for historical outdoor waterfront stadium. i (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Miamarina Miamarina Miamarina Miamarina –––– Pier 5, MiamiPier 5, MiamiPier 5, MiamiPier 5, Miami, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2018 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Marine engineering design and environmental permitting for proposed pier extension. Design of new dock replacing part of existing structure. j. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Myers Park, MiamiMyers Park, MiamiMyers Park, MiamiMyers Park, Miami, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Marine engineering, environmental permitting and field investigations for boat ramp facility improvements, seawall replacement, floating dock and baywalk. k. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Playa Largo Ocean Playa Largo Ocean Playa Largo Ocean Playa Largo Ocean Residences, Key LargoResidences, Key LargoResidences, Key LargoResidences, Key Largo, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Marine engineering, environmental permitting and field investigations for waterfront and marine improvements for a multi- family development. Design of shoreline stabilization, elevated boat ramps, seawall and wooden docks. l. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Rickenbacker Causeway North Hobie Beach, MiamiRickenbacker Causeway North Hobie Beach, MiamiRickenbacker Causeway North Hobie Beach, MiamiRickenbacker Causeway North Hobie Beach, Miami----Dade Dade Dade Dade County, FloridaCounty, FloridaCounty, FloridaCounty, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Civil/coastal design for recreational development involving 9.6 acres of shoreline stabilization and upland facility. New parking lot and roadway and excavation/fill activities, stormwater improvements, sheet pile installation, retaining walls, beach access, revetment and jetties. m. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED SE 25th Road Street End, MiamiSE 25th Road Street End, MiamiSE 25th Road Street End, MiamiSE 25th Road Street End, Miami, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2019 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Civil/marine engineering for 100-ft seawall replacement, floating dock and baywalk. Field investigations conducted and environmental permits processed. Bidding assistance and construction administration services to be provided. Page 36 a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Bal Harbour Village Park, Bal Bal Harbour Village Park, Bal Bal Harbour Village Park, Bal Bal Harbour Village Park, Bal HarbourHarbourHarbourHarbour, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Marine engineering design of shoreline associated with waterfront park. Design of new elevated sheet pile seawall installation, wooden dock, kayak launch, outfall extensions with manatee grates, and baywalk. Performed structural assessment of seawall and dock. b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED CityCityCityCity----wide Seawall Assessments, West Palm Beachwide Seawall Assessments, West Palm Beachwide Seawall Assessments, West Palm Beachwide Seawall Assessments, West Palm Beach, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2019 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Structural assessments of 7 miles of existing bulkhead to determine remaining useful life and propose repair/replacement solutions. c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Currie Park, West Palm BeachCurrie Park, West Palm BeachCurrie Park, West Palm BeachCurrie Park, West Palm Beach, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2019 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Marine engineering, environmental consulting and construction administration services for design of staging dock, deteriorated boat ramp and maintenance dredging. d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED First Presbyterian Church, MiamiFirst Presbyterian Church, MiamiFirst Presbyterian Church, MiamiFirst Presbyterian Church, Miami, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2019 Present (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Shoreline stabilization design and environmental permitting of 220 feet of seawall and bulkhead. Civil design of City baywalk. e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Haulover Beach Park, North Miami BeachHaulover Beach Park, North Miami BeachHaulover Beach Park, North Miami BeachHaulover Beach Park, North Miami Beach, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Marine engineering design and environmental permitting of 20,000-sf concrete boat ramp and 3,200 sf of floating docks. f. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Hillsboro Inlet District South Jetty Restoration, Broward CountyHillsboro Inlet District South Jetty Restoration, Broward CountyHillsboro Inlet District South Jetty Restoration, Broward CountyHillsboro Inlet District South Jetty Restoration, Broward County, , , , FloridaFloridaFloridaFlorida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2019 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Marine engineering design for breakwater structure replacement consisting of 400 feet of sheet pile and 1,020 tons of riprap. Field investigations conducted, environmental permits obtained, bidding, and construction administration services provided. g. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED James L. Knight Center, MiamiJames L. Knight Center, MiamiJames L. Knight Center, MiamiJames L. Knight Center, Miami, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Mahsa Kamali, Ph.D.Mahsa Kamali, Ph.D.Mahsa Kamali, Ph.D.Mahsa Kamali, Ph.D. Structural EngineerStructural EngineerStructural EngineerStructural Engineer a. TOTAL b. WITH CURRENT FIRM 5 1 15. FIRM NAME AND LOCATION (City and State) Coastal Systems International, Coral Gables, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) PE Structural (Exam passed, Application in process), CA Doctor of Philosophy, Structural Engineering, University of Miami, Coral Gables, Florida, 2017 Bachelor of Science, Civil Engineering, Sharif University of Technology, Tehran, Iran, 2013 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Ms. Kamali has over five years of research and design experience in the civil and structural engineering fields. Prior to joining Coastal Systems, Ms. Kamali was a research assistant at University of Miami specialized in green construction, sustainable concrete materials and simulations using finite element analysis for complex structural systems. Before starting her Ph.D. program, Ms. Kamali worked as a structural engineer intern in a structural design company. As a structural engineer at Coastal Systems, Ms. Kamali is responsible for feasibility studies, engineering calculations and design, preparation of construction plans and specifications, field investigations and construction administration on a variety of projects that include marinas, shoreline stabilization and marine structures. 19. RELEVANT PROJECTS Page 37 Engineering design and environmental permitting of 500 feet of bulkhead replacement. Design involves a transient docking facility, bumpers and fender piles, and cleat replacements. h. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Kennedy Park Overwater Boardwalk, Miami, FloridaKennedy Park Overwater Boardwalk, Miami, FloridaKennedy Park Overwater Boardwalk, Miami, FloridaKennedy Park Overwater Boardwalk, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Performed the field inspection and prepared a structural assessment report for the existing boardwalk. Responsible for design of a new boardwalk to replace the existing structure. i. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Marine Stadium Restoration, Key Biscayne, FloridaMarine Stadium Restoration, Key Biscayne, FloridaMarine Stadium Restoration, Key Biscayne, FloridaMarine Stadium Restoration, Key Biscayne, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Performed the field inspection and prepared a structural assessment report for the existing seawall. Responsible for design of structural repairs of the existing piles supporting the seaward portion of the stadium. j. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Maurice Gibb Memorial Park, Miami BeachMaurice Gibb Memorial Park, Miami BeachMaurice Gibb Memorial Park, Miami BeachMaurice Gibb Memorial Park, Miami Beach, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Design, planning, permitting of 2-acre waterfront park. Designed proposed waterfront improvements, including the bulkhead, overlook and fishing pier. Designed foundation for playground equipment and shade structures. k. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Miamarina Miamarina Miamarina Miamarina –––– Pier 5, MiamiPier 5, MiamiPier 5, MiamiPier 5, Miami, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2018 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Marine engineering design and environmental permitting for proposed pier extension. Design of new dock replacing part of existing structure. Provided bidding assistance and construction administration. l. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Myers Park, MiamiMyers Park, MiamiMyers Park, MiamiMyers Park, Miami, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Marine engineering, environmental permitting and field investigations for boat ramp facility improvements, seawall replacement, floating dock and baywalk. Page 38 a. (1) TITLE AND LOCATION (City and State) Bal Harbour Coastal Management and Inundation Study, Bal Bal Harbour Coastal Management and Inundation Study, Bal Bal Harbour Coastal Management and Inundation Study, Bal Bal Harbour Coastal Management and Inundation Study, Bal HarbourHarbourHarbourHarbour, Florida, Florida, Florida, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Advising the Village on resilience as it relates to climate change and sea level rise. Actions are outlined in a 3-Year Resilience Strategic Plan, which includes an evaluation of the Village’s current policies and projects; reviewing and recommending revisions to the Coastal Element of the Village’s Comprehensive Plan to incorporate resilience approaches; collecting GIS data, conducting modeling analyses to project the proposed impacts from sea level rise and storm surge; and public outreach. b. (1) TITLE AND LOCATION (City and State) Bal Harbour Village Park, Bal HarbourBal Harbour Village Park, Bal HarbourBal Harbour Village Park, Bal HarbourBal Harbour Village Park, Bal Harbour, Florida, Florida, Florida, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Environmental permitting and marine engineering design of shoreline associated with waterfront park. Design of docking facilities and baywalk. Procuring environmental permits from Miami-Dade County DERM, FDEP, and the U.S. Army Corps of Engineers. Modifying the FDEP Sovereign Submerged Lands (SSL) Lease to include additional waterfront area for the mooring of a police enforcement vessel. c. (1) TITLE AND LOCATION (City and State) Bayshore Park, Miami BeachBayshore Park, Miami BeachBayshore Park, Miami BeachBayshore Park, Miami Beach, Florida, Florida, Florida, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Providing site civil engineering and environmental permitting services for proposed 20-acre park comprised of lake, walking trails, boardwalks and promenade. Environmental permits to be processed through Miami-Dade County (RER), FDEP, NPDES, Miami-Dade County Health Department, and City of Miami Beach Public Works. d. (1) TITLE AND LOCATION (City and State) Coastal Inundation & Economic Vulnerability Study, Bal HarbourCoastal Inundation & Economic Vulnerability Study, Bal HarbourCoastal Inundation & Economic Vulnerability Study, Bal HarbourCoastal Inundation & Economic Vulnerability Study, Bal Harbour, , , , FloridaFloridaFloridaFlorida (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2020 N/A E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Taylor ScheuermannTaylor ScheuermannTaylor ScheuermannTaylor Scheuermann Environmental/Permitting Project ManagerEnvironmental/Permitting Project ManagerEnvironmental/Permitting Project ManagerEnvironmental/Permitting Project Manager a. TOTAL b. WITH CURRENT FIRM 4 3 15. FIRM NAME AND LOCATION (City and State) Coastal Systems International, Coral Gables, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Master of Professional Science, Marine Affairs and Policy, University of Miami – Rosenstiel School of Marine and Atmospheric Science, Miami, Florida, 2016 Bachelor of Arts, Marine Affairs and Policy, University of Miami, Coral Gables, Florida, 2015 Bachelor of Arts, Ecosystem Science and Policy, University of Miami, Coral Gables, Florida, 2015 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Ms. Scheuermann provides various environmental services to public and private clients in her role as Environmental/Permitting Project Manager. She specifically manages projects involving coastal and environmental permit applications, among other specialized regulatory requirements at the local, county, state, and federal levels. She has expertise working with various environmental agencies such as the Florida Department of Environmental Protection and U.S. Army Corps of Engineers, as well as all local municipalities in Miami-Dade, Broward, Palm Beach, and Duval counties. She has an in-depth understanding of the many regulations and procedures governing coastal/waterfront construction, and has established relationships with key regulatory agency personnel. Ms. Scheuermann has an extensive knowledge of coastal biology and coastal zone management in the US. She has conducted mangrove and fish assemblage resource surveys, and she has experience in a wide range of coastal and environmental analyses. Her areas of focus include coastal and waterfront site development, specifically project feasibility, conceptual design, and permitting strategy. Her regular project management responsibilities include coordination with project teams and regulatory agencies, thorough historic and current research, and environmental permit processing. Professional Affiliations:Professional Affiliations:Professional Affiliations:Professional Affiliations: The Propeller Club of the United States – Port Miami, Maritime Law Society Certifications:Certifications:Certifications:Certifications: PADI Open Water Diving Certified, 2017, First Aid and CPR 19. RELEVANT PROJECTS Page 39 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Assessment of Village’s vulnerability to sea level rise and storm surge. Performing economic impact assessment of the cost of “doing nothing.” Obtained Resiliency Planning Grant from FDEP Resilient Coastlines Program. Held public workshops for Village and residents to obtain feedback regarding stakeholder goals related to coastal resilience in the future. e. (1) TITLE AND LOCATION (City and State) Fisher Island Visitor’s Marina, MiamiFisher Island Visitor’s Marina, MiamiFisher Island Visitor’s Marina, MiamiFisher Island Visitor’s Marina, Miami, Florida, Florida, Florida, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2019 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Prepared an in-depth Resiliency Report for the client, which was used to accurately choose the appropriate replacement dock specifications for the marina. Coordinated with the FDEP and DERM to obtain a Permit Modification and a Class I Construction permit, respectively. Coordinated with the FDEP and the client to perform a SSL determination and to reapply for an expiring lease. f. (1) TITLE AND LOCATION (City and State) Haulover Beach Park Sea Level Rise Study, North Miami BeachHaulover Beach Park Sea Level Rise Study, North Miami BeachHaulover Beach Park Sea Level Rise Study, North Miami BeachHaulover Beach Park Sea Level Rise Study, North Miami Beach, , , , FloridaFloridaFloridaFlorida (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Vulnerability assessment of upland infrastructure, protective shoreline features and docking facility. Storm surge and wave propagation modeling conducted to predict flooding impacts for 25-, 50- and 100-year storm events, both today, with future sea level rise levels and King Tide event impacts. Provided recommendations for reducing flood impacts and refining design to achieve improved resiliency. h. (1) TITLE AND LOCATION (City and State) Historic District Resilience and Adaptation Guidelines, Miami Historic District Resilience and Adaptation Guidelines, Miami Historic District Resilience and Adaptation Guidelines, Miami Historic District Resilience and Adaptation Guidelines, Miami BeachBeachBeachBeach, Florida, Florida, Florida, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2019 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Developing guidelines and regulations for the renovation, raising, and/or re-purposing of historic structures in low-lying areas of the City of Miami Beach that are vulnerable to ongoing and increasing tidal flooding, as well as the long-term impacts of sea level rise. h. (1) TITLE AND LOCATION (City and State) Jade Signature, Sunny Isles BeachJade Signature, Sunny Isles BeachJade Signature, Sunny Isles BeachJade Signature, Sunny Isles Beach, , , , FloridaFloridaFloridaFlorida (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Provided environmental consulting services for 58-story condominium. Coordinated with design team and environmental agencies regarding beach fencing along the property’s edge, exterior lighting, and the installation of a sculpture. i. (1) TITLE AND LOCATION (City and State) North Bay Village Boardwalk, North Bay VillageNorth Bay Village Boardwalk, North Bay VillageNorth Bay Village Boardwalk, North Bay VillageNorth Bay Village Boardwalk, North Bay Village, Florida, Florida, Florida, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Environmental permitting services for a proposed public boardwalk. Prepared environmental permit applications and public workshop materials to obtain public feedback design. j. (1) TITLE AND LOCATION (City and State) Rickenbacker Causeway North Hobie Beach, MiamiRickenbacker Causeway North Hobie Beach, MiamiRickenbacker Causeway North Hobie Beach, MiamiRickenbacker Causeway North Hobie Beach, Miami----Dade CountyDade CountyDade CountyDade County, , , , FloridaFloridaFloridaFlorida (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Design and permitting of 9.4-acre waterfront corridor, including shoreline stabilization, landscaping, invasive species removal with native species restoration, parking improvements, and stormwater management. Secured permits through Miami-Dade DERM, FDEP and the Corps. k. (1) TITLE AND LOCATION (City and State) Turnberry Ocean Club, Sunny Isles BeachTurnberry Ocean Club, Sunny Isles BeachTurnberry Ocean Club, Sunny Isles BeachTurnberry Ocean Club, Sunny Isles Beach, Florida, Florida, Florida, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present 2020 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Evaluated design and obtained environmental permits for a 52-story condominium tower with a cantilevered deck and swimming pool with off-site placement of approximately 12,000 cubic yards of excavated material onto the nearby beach area from FDEP. Coordinated exterior lighting approval with FWC. l. (1) TITLE AND LOCATION (City and State) Williams Island Marina, Williams Island Marina, Williams Island Marina, Williams Island Marina, AventuraAventuraAventuraAventura, Florida, Florida, Florida, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present Present (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Coordinated the submittal of the permit application package for the FDEP Joint Environmental Resource Permit (ERP) and Miami-Dade County Department of Environmental Resource Management (DERM) Class I Construction Permit. Reviewed project sketches for the marina and coordinated with engineers prior to application submittal. Page 40 a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Avalon Shores Sewage Pump Avalon Shores Sewage Pump Avalon Shores Sewage Pump Avalon Shores Sewage Pump Station, MarylandStation, MarylandStation, MarylandStation, Maryland PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2018 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Prepared construction drawings and contract specifications for civil, mechanical and electrical improvements. Managed construction administration for the civil, mechanical and electrical improvements to the Avalon Shores SPS including review of shop drawings and responding to RFIs. b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Bal Harbour Village Park, Bal HarbourBal Harbour Village Park, Bal HarbourBal Harbour Village Park, Bal HarbourBal Harbour Village Park, Bal Harbour,,,, FloridaFloridaFloridaFlorida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Marine engineering design of shoreline associated with waterfront park. Design of new elevated sheet pile seawall installation and wooden dock. c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Coastal Inundation & Economic Coastal Inundation & Economic Coastal Inundation & Economic Coastal Inundation & Economic Vulnerability Study, Bal Vulnerability Study, Bal Vulnerability Study, Bal Vulnerability Study, Bal HarbouHarbouHarbouHarbourrrr,,,, FloridaFloridaFloridaFlorida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2020 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Assessment of Village’s vulnerability to sea level rise and storm surge. Performing economic impact assessment of the cost of “doing nothing.” Prepared vulnerability and economic assessment report. d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Elkton West Sanitary Sewer Mill Run Service Area, MarylandElkton West Sanitary Sewer Mill Run Service Area, MarylandElkton West Sanitary Sewer Mill Run Service Area, MarylandElkton West Sanitary Sewer Mill Run Service Area, Maryland PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Designed a gravity sewer system for the Elkton West Sanitary Sewer Area. e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Haulover Haulover Haulover Haulover Beach ParkBeach ParkBeach ParkBeach Park MarinaMarinaMarinaMarina, North Miami Beach, North Miami Beach, North Miami Beach, North Miami Beach, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Marine engineering design and environmental permitting of 20,000-sf concrete boat ramp and 3,200 sf of floating docks. Prepared associated construction drawings and cost estimate. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Emily ProsserEmily ProsserEmily ProsserEmily Prosser Jr. Project ManagerJr. Project ManagerJr. Project ManagerJr. Project Manager a. TOTAL b. WITH CURRENT FIRM 5 1 15. FIRM NAME AND LOCATION (City and State) Coastal Systems International, Coral Gables, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Bachelor of Science, Environmental Engineering, Johns Hopkins University 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Emily Prosser, with over 5 years of civil and environmental design experience, serves as a Jr. Project Manager at Coastal Systems. Emily is responsible for feasibility studies, engineering calculations and design, preparation of construction plans and specifications, field investigations and construction administration on a variety of projects that include marinas, shoreline stabilization and marine structures. Her responsibilities include planning, coordination, and management of civil projects. Prior to joining Coastal Systems, Emily worked as a project engineer, specializing in municipal water and wastewater systems. She prepared and coordinated engineering drawings and design specifications for projects including potable water distribution, sanitary sewer collection, and sewage pump stations and wastewater treatment plant improvements. She conducted site visits for design and construction, and led condition assessments for stormwater facilities. Emily oversaw projects and supporting staff to ensure design and deliverables were on time and within scope. Tasks included forecasting future estimated costs, tracking budgets, invoicing, and reviewing contract documents for quality assurance. She also performed construction administration including submittal review, requests for information (RFI) responses, and facilitated design and construction meetings with clients, contractors, and engineers to ensure the success of completed projects. CertificationsCertificationsCertificationsCertifications NASSCO Pipeline, Manhole, and Lateral Assessment Certification Program (PACP, MACP, and LACP) Virginia DEQ Stormwater Management Inspector OSHA 10 Hour Construction Training 19. RELEVANT PROJECTS Page 41 f. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Haulover Beach ParkHaulover Beach ParkHaulover Beach ParkHaulover Beach Park MarinaMarinaMarinaMarina Sea Level Rise Study, North Sea Level Rise Study, North Sea Level Rise Study, North Sea Level Rise Study, North Miami BeachMiami BeachMiami BeachMiami Beach, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Prepared evaluation of sea level rise impacts to existing boat ramp facility infrastructure. Provided design recommendations based on modeling analysis results. g. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Little Elk Creek Force Main, MarylandLittle Elk Creek Force Main, MarylandLittle Elk Creek Force Main, MarylandLittle Elk Creek Force Main, Maryland PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Designed and prepared contract drawings for a dual 14” force main from a proposed pump station and an existing wastewater treatment plant. Developed permit drawings and applications for agency review. h. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Miamarina Miamarina Miamarina Miamarina –––– Pier 5, MiamiPier 5, MiamiPier 5, MiamiPier 5, Miami, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2018 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Marine engineering design and environmental permitting for proposed pier extension. Prepared contract drawings for dock improvements that included new concrete beams, piles, decking and rerouting of dock utilities. i. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Myers Park, MiamiMyers Park, MiamiMyers Park, MiamiMyers Park, Miami, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Civil/marine engineering, environmental permitting and field investigations for boat ramp facility improvements, seawall replacement, floating dock and baywalk. j. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Natiivo, MiamiNatiivo, MiamiNatiivo, MiamiNatiivo, Miami, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Civil engineering and environmental permitting for proposed high-rise development. Prepared NPDES documents. k. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Pennsylvania Avenue and Conway Wastewater Pumping Pennsylvania Avenue and Conway Wastewater Pumping Pennsylvania Avenue and Conway Wastewater Pumping Pennsylvania Avenue and Conway Wastewater Pumping Stations, VirginiaStations, VirginiaStations, VirginiaStations, Virginia PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Designed site and mechanical alternatives using hydraulic calculations, client input, and industry standards for two pumping stations in a series of 8 stations to be replaced. Wrote design memo based on site visits, design constraints, and operator input to be used for standardization of future city pump station replacements and upgrades. l. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED South Kent Island Sanitary Project Phase 1, MarylandSouth Kent Island Sanitary Project Phase 1, MarylandSouth Kent Island Sanitary Project Phase 1, MarylandSouth Kent Island Sanitary Project Phase 1, Maryland PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2015 2016 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Designed over 30,000 linear feet of pressure sewer mains, assessing conflicts with existing utilities and environmentally sensitive areas. m. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Sunrise Park, Hallandale BeachSunrise Park, Hallandale BeachSunrise Park, Hallandale BeachSunrise Park, Hallandale Beach, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Civil engineering and environmental permitting for proposed park improvements. Prepared NPDES documents. p. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Water Systems Master Plan and Model, MarylandWater Systems Master Plan and Model, MarylandWater Systems Master Plan and Model, MarylandWater Systems Master Plan and Model, Maryland PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Provided recommendations for 10-year capital improvement programs by analyzing alternatives for water treatment plant layouts and tank design based on future design flow, cost estimates, permitting, and client input. Page 42 a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Antonio Maceo Park, MiamiAntonio Maceo Park, MiamiAntonio Maceo Park, MiamiAntonio Maceo Park, Miami, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Conducted bathymetric survey in order to obtain an Environmental Resource Permit for improvements to existing dock structure. b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Dinner Key Marina Maintenance Dredging, MiamiDinner Key Marina Maintenance Dredging, MiamiDinner Key Marina Maintenance Dredging, MiamiDinner Key Marina Maintenance Dredging, Miami, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2009 2009 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Hydrographic and marine resource surveys to design and permit maintenance dredging in 580-slip marina. Design of dredging and material disposal for 6,000 cubic yards of material with elevated levels of contaminants. Performed pre/post hydrographic contract payment surveys. c. (1) TITLE AND LOCATION (City and State) Estates at Estates at Estates at Estates at Acqualina, Sunny Isles BeachAcqualina, Sunny Isles BeachAcqualina, Sunny Isles BeachAcqualina, Sunny Isles Beach, Florida, Florida, Florida, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present Present (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Conducted pre- and post-construction beach profile, topographic and bathymetric surveys, daily construction surveying and turbidity monitoring for placement of 25,000 cy of beach fill. d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Fern Isle Park, MiamiFern Isle Park, MiamiFern Isle Park, MiamiFern Isle Park, Miami, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Conducted unmanned aerial survey for the shoreline stabilization design and environmental permitting of 500 feet of canal bank and 40-ft kayak launch ramp. e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Fort Zachary Taylor State Park, Key WestFort Zachary Taylor State Park, Key WestFort Zachary Taylor State Park, Key WestFort Zachary Taylor State Park, Key West, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2007 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Coastal engineering design and environmental permitting for breakwaters, jetties and beach fill project for shoreline protection at park. Performed beach profile surveys. (2) YEAR COMPLETED E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Aaron BoehningAaron BoehningAaron BoehningAaron Boehning Hydrographic SurveyorHydrographic SurveyorHydrographic SurveyorHydrographic Surveyor a. TOTAL b. WITH CURRENT FIRM 22 11 15. FIRM NAME AND LOCATION (City and State) Coastal Systems International, Coral Gables, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Civil Engineering Technology Degree, North Dakota State College of Science, Wahpeton, North Dakota, 1998 Construction Management Technology Degree (1 year), North Dakota State College of Science, 1998 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Boehning has extensive experience collecting field data in the coastal/marine environment. He has planned and conducted beach profile surveys throughout the State of Florida for a variety of purposes including contract payment, monitoring, and post- hurricane assessments. These surveys have also required topographic and geodetic control surveys for the land-based work. Mr. Boehning also conducts ground control for upland and UAV surveying. Mr. Boehning has performed surveys with advanced equipment including the following: • Unmanned Aerial Vehicle (UAV) • GPS Receivers (DGPS and RTK) • Magnetometers • Echo Sounders (fathometers) • Heave/Pitch/Roll Sensors • Electronic Tide Gauges • Conventional Total Station and Levels • Towed Underwater Video 19. RELEVANT PROJECTS Page 43 f. (1) TITLE AND LOCATION (City and State) Hillsboro/Deerfield Beach Nourishment, Broward CountyHillsboro/Deerfield Beach Nourishment, Broward CountyHillsboro/Deerfield Beach Nourishment, Broward CountyHillsboro/Deerfield Beach Nourishment, Broward County, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2014 2015 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Performed beach profiles, hydrographic surveys, aerial photography, magnetometer surveys and monitoring for 550,000 cy beach fill project. g. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Hillsboro Inlet Bypassing, Broward CountyHillsboro Inlet Bypassing, Broward CountyHillsboro Inlet Bypassing, Broward CountyHillsboro Inlet Bypassing, Broward County, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2008 2008 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Conducted hydrographic and marine resource surveys for ongoing maintenance dredging and sand bypassing, including nearshore hardbottom in exterior sand trap channel area and seagrass in interior inlet area adjacent to navigation channel. h. (1) TITLE AND LOCATION (City and State) Hollywood Beach Renourishment, Broward CountyHollywood Beach Renourishment, Broward CountyHollywood Beach Renourishment, Broward CountyHollywood Beach Renourishment, Broward County, Florida, Florida, Florida, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2012 2012 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Performed bathymetric surveys for two segments of interim beach renourishment consisting of 79,400 cy of beach fill. i. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Jade Signature, Sunny Isles BeachJade Signature, Sunny Isles BeachJade Signature, Sunny Isles BeachJade Signature, Sunny Isles Beach, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2009 2009 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Pre-construction beach profile surveys and mapping for 5,000 linear feet of shoreline conducted prior to the implementation of the proposed truck haul beach nourishment. Provided Resident Project Representative (RPR), construction surveying and turbidity monitoring services. j. (1) TITLE AND LOCATION (City and State) Kennedy Park Shoreline Stabilization and Dock Replacement, Kennedy Park Shoreline Stabilization and Dock Replacement, Kennedy Park Shoreline Stabilization and Dock Replacement, Kennedy Park Shoreline Stabilization and Dock Replacement, Miami, FMiami, FMiami, FMiami, Floridaloridaloridalorida (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2013 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Conducted detailed mangrove and upland vegetation and topographic surveys to determine areas in need of enhancement and placement of view corridors. k. (1) TITLE AND LOCATION (City and State) Maurice Gibb Memorial Park, Miami BeachMaurice Gibb Memorial Park, Miami BeachMaurice Gibb Memorial Park, Miami BeachMaurice Gibb Memorial Park, Miami Beach, , , , FloridaFloridaFloridaFlorida (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Conducted unmanned aerial survey of 0.08 sq. mile area for the design, planning and permitting of 2-acre waterfront park. l. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Miamarina Miamarina Miamarina Miamarina –––– Pier 5, MiamiPier 5, MiamiPier 5, MiamiPier 5, Miami, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2018 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Field investigations for marine engineering, environmental permitting and underwater assessment for design of charter fishing dock. m. (1) TITLE AND LOCATION (City and State) RitzRitzRitzRitz----Carlton Residences, Sunny Isles BeachCarlton Residences, Sunny Isles BeachCarlton Residences, Sunny Isles BeachCarlton Residences, Sunny Isles Beach, Florida, Florida, Florida, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Present 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Conducted unmanned aerial survey of 0.15 sq. mile area for luxury residential project. Coordinated with County and regulatory agencies to process required Notices to Proceed for beach fill activities. Page 44 a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Dinner Key Managed Mooring Field, MiamiDinner Key Managed Mooring Field, MiamiDinner Key Managed Mooring Field, MiamiDinner Key Managed Mooring Field, Miami, F, F, F, Floridaloridaloridalorida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2009 2009 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Design and environmental permitting of a 225-slip managed mooring field. Conducted hydrographic surveys, jet probes and marine resource surveys. Prepared construction plans and specifications and provided construction administration services including underwater inspections. Analyzed survey data and creation of base map. b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Estates at Acqualina, Sunny Isles BeachEstates at Acqualina, Sunny Isles BeachEstates at Acqualina, Sunny Isles BeachEstates at Acqualina, Sunny Isles Beach, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2018 2018 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Conducted pre- and post- topographic and bathymetric surveys of 25,000 cy of beach fill. Analyzed survey data and creation of base map. c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Florida Department of Environmental Protection (FDEP) State Florida Department of Environmental Protection (FDEP) State Florida Department of Environmental Protection (FDEP) State Florida Department of Environmental Protection (FDEP) State Parks Shoreline Stabilization Studies, Monroe CountyParks Shoreline Stabilization Studies, Monroe CountyParks Shoreline Stabilization Studies, Monroe CountyParks Shoreline Stabilization Studies, Monroe County, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2003 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Shoreline condition studies at Curry Hammock, Long Key, Bahia Honda, and Fort Zachary Taylor State Parks. Feasibility for shoreline improvements and GIS work completed along with hydrographic surveys and aerial photogrammetric mapping. Analyzed survey data and creation of base map. d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Ft. Lauderdale Boat Club, Ft. LauderdaleFt. Lauderdale Boat Club, Ft. LauderdaleFt. Lauderdale Boat Club, Ft. LauderdaleFt. Lauderdale Boat Club, Ft. Lauderdale, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2012 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Redevelopment of existing 10-acre marina site to include two day storage buildings for 300 dry slips and docks for 18 wet slips for vessels up to 120 feet, as well as a boatyard facility, design piers and forklift launching areas. Civil engineering provided for paving, grading, drainage water and sewer for the site. Analyzed survey data and creation of base map. e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Ft. Zachary Taylor State Park, Key WestFt. Zachary Taylor State Park, Key WestFt. Zachary Taylor State Park, Key WestFt. Zachary Taylor State Park, Key West, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2007 2007 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Coastal engineering design and environmental permitting for breakwaters, jetties and beach fill project for shoreline protection at park. Performed beach profile surveys. Analyzed survey data and creation of base map. f. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Hillsboro/Deerfield Beach Restoration, Broward Hillsboro/Deerfield Beach Restoration, Broward Hillsboro/Deerfield Beach Restoration, Broward Hillsboro/Deerfield Beach Restoration, Broward CountyCountyCountyCounty, , , , FloridaFloridaFloridaFlorida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2014 2015 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Coastal engineering and environmental permitting for 375,000-cubic-yard beach fill project. Performed all beach profiles, hydrographic surveys, aerial photography, magnetometer surveys and monitoring. Analyzed survey data and creation of base map. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Sandra RahmanSandra RahmanSandra RahmanSandra Rahman GIS AnalystGIS AnalystGIS AnalystGIS Analyst a. TOTAL b. WITH CURRENT FIRM 22 21 15.FIRM NAME AND LOCATION (City and State) Coastal Systems International – Coral Gables, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) I.D.P.M. Diploma, School of Business & Computer Science, Trinidad & Tobago, 1993 GIS, University of the West Indies, 1991 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Sandra Rahman is responsible for processing all field data collected by Coastal Systems for use in analysis, monitoring, and design. She regularly utilizes Digital Terrain Modeling (DTM) software to generate contour maps and calculate cut/fill volumes for a variety of coastal and dredging projects. She is also responsible for providing deliverables in GIS formats, as well as providing full GIS capabilities for the firm with ESRI software. Before Coastal Systems, Sandra worked for the Petroleum Company of Trinidad and Tobago. She was responsible for computer-aided drafting and design using AutoCAD. In addition, she was responsible for scanning, vectorizing, and digitizing, GPS post-processing, cadastral and topographic maps, geological drawings, royalty and volume computations using terrain-modeling software, and managing the database for thousands of drawings as well as control point records. 19. RELEVANT PROJECTS Page 45 g. Hollywood Beach Management Strategic Plan, HollywoodHollywood Beach Management Strategic Plan, HollywoodHollywood Beach Management Strategic Plan, HollywoodHollywood Beach Management Strategic Plan, Hollywood, , , , FloridaFloridaFloridaFlorida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2011 2011 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Strategic beach management planning services provided to the City of Hollywood and Hollywood Beach CRA for immediate erosional hot spot management and potential longer-term solutions for beach stabilization. Analyzed survey data and creation of base map. h. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Miami Beach Stormwater Master Plan, Miami BeachMiami Beach Stormwater Master Plan, Miami BeachMiami Beach Stormwater Master Plan, Miami BeachMiami Beach Stormwater Master Plan, Miami Beach, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2010 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm GIS analysis for report produced to develop a Stormwater Master Plan (SWMP) consistent with Miami-Dade County’s Master Plan. Analyzed survey data and creation of base map. i. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED MiamiMiamiMiamiMiami----Dade County Morphological Change Study, MiamiDade County Morphological Change Study, MiamiDade County Morphological Change Study, MiamiDade County Morphological Change Study, Miami---- Dade CountyDade CountyDade CountyDade County, , , , FloridaFloridaFloridaFlorida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2007 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Study of volumetric and morphological changes between Bakers Haulover Inlet and Government Cut with detailed analysis on the performance of the 32nd Street Breakwater Project. Establishment of regional GIS database for beach management and update of regional sediment budget with survey data between 1980 and 2004. Prepared recommendations for further hot-spot stabilization and backpassing beach management County-wide. Analyzed survey data and creation of base map. j. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Peanut Island Environmental Restoration, Palm Beach CountyPeanut Island Environmental Restoration, Palm Beach CountyPeanut Island Environmental Restoration, Palm Beach CountyPeanut Island Environmental Restoration, Palm Beach County, , , , FFFFloridaloridaloridalorida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2004 2005 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Coastal/civil and marine structures design for 1.5-acre artificial reef habitat and 1.3-acre shallow seagrass lagoon. Additional features include a tidal pond and flushing channel, shallow-draft marina with floating docks, pedestrian boardwalks, and site utility upgrades. Analyzed survey data and creation of base map. k. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Pier 66 Pier 66 Pier 66 Pier 66 Marina, Ft. LauderdaleMarina, Ft. LauderdaleMarina, Ft. LauderdaleMarina, Ft. Lauderdale, Florida, Florida, Florida, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2015 2015 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Planning and design of 60-slip mega-yacht marina facility. Design of upland excavation and basin dredging, including material handling and disposal design. Design of bulkhead improvements and associated shore-support structures, along with a portion of fixed docks. Analyzed survey data and creation of base map. l. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Seawall Seawall Seawall Seawall Maintenance Database, Miami Beach, FloridaMaintenance Database, Miami Beach, FloridaMaintenance Database, Miami Beach, FloridaMaintenance Database, Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2011 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm GIS Analyst, evaluated 74 seawall structures that had not been repaired or replaced, and condition ratings were assigned to these structures. An assessment protocol was developed that included the collection of attributes such as the type, configuration, presence of outfall(s), condition and dimensions along with photographs of each structure. A database was developed using Microsoft Access to manage the field data collection and to produce the required reports from queries. The City was provided with the digital files for import into their GIS to be maintained as seawalls are replaced. Analyzed survey data and creation of base map. m. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Village of Key Biscayne Beach ManagementVillage of Key Biscayne Beach ManagementVillage of Key Biscayne Beach ManagementVillage of Key Biscayne Beach Management, , , , Key Biscayne, Key Biscayne, Key Biscayne, Key Biscayne, FloridaFloridaFloridaFlorida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2012 2012 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Coastal engineering and environmental permitting for 120,000 cubic yard beach fill project. Marine resource and hydrographic surveys conducted, along with sand source search, jet probes, vibracores, and marine archeological surveys. Analyzed survey data and creation of base map. Page 46 Proposal Title: City of Sunny Isles Beach Continuing Services RFQ Ardaman & Associates, Inc. STANDARD FORM 330 (6/2004) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPEREINCE Evelio N. Horta, Ph.D, P.E, G.E Geotechnical Engineer a. Total 44 b. With Current Firm 26 15. FIRM NAME AND LOCATON (City and State) Ardaman & Associates, Inc., 2608 W. 84th St, Hialeah, Florida 33016 16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) BS Civil Engineer MS Civil Engineer Ph.D., Geotechnical Engineer Florida Professional Engineer No. 46625 California Professional Engineer No. 77531 California Geotechnical Engineer No. 2976 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FPL Greynolds Substation, 2405 Sunny Isles Blvd PROFESSIONAL SERVICES 2019 CONSTRUCTION (if applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firms Dr. Horta served as Senior Project Engineer for this project which included SPT borings down to 50 feet to evaluate soil conditions and provide drilled shaft recommendations for foundation design for a new FPL transmission pole. Ardaman Fees: $3,639.82 b. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED I-20 Bridge at the Mississippi River, Louisiana-Mississippi DPT 2012-Present 2012-present CONSTRUCTION (if applicable) 3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firms The I-20 Bridge has been suffering displacements along the bridge alignment related to foundation movements on the Mississippi side of the river. Dr. Horta serves as Senior Geotechnical Engineer in charge of the numerical modeling of the river bluff and bridge foundations included within the 1800 x 2000 feet area of the Mississippi River. The analysis is being performed using two and three-dimensional numerical methods to provide repair and stabilization recommendations. Ardaman Fees: $3,000,000.00 c. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Haulover Park Marina, Miami Beach, Florida PROFESSIONAL SERVICES 2011-2015 CONSTRUCTION (if applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firms Dr. Horta served as senior geotechnical engineer for this study, which explored subsurface conditions in order to evaluate soil conditions for a butler-type building and a new bulkhead at Haulover Park Marinas SPT borings were completed to depths from 40 to 80 feet. Twelve SPT’s were done on land and 3 SPT’s were done in the water. Recommendations were made for the bulkhead, the new building, and a related platform for forklift operations. Ardaman Fees Approx. $45,000.00 d. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FPL transmission poles on NE 163 St Bridge, at NE 26 Ave & Oleta River, Sunny Isles 2018 CONSTRUCTION (if applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE check if project performed with current firms Dr. Horta served as Senior Project Engineer for this project which included SPT borings down to 50 feet to evaluate soil conditions and provide drilled shaft recommendations for foundation design for 4 new FPL transmission poles. Ardaman Fees: $11,279.60 Page 47 12. NAME 13. ROLE IN THIS CONTRACT 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE b. WITH CURRENT FIRMa. TOTAL 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) 15. FIRM NAME AND LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 2 a. b. c. d. (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) e. Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Rene I. Basulto, Principal Basulto & Associates, Inc. Consulting Engineers Miami Lakes, Florida Florida International University: College of Engineering & Applied Sciences - Degree: Bachelor of Science in Mechanical Engineering - Certification: Heating, Ventilation and Air Conditioning Miami-Dade Community College - Major: Associates in Arts Engineering Degree Certified in Plumbing Design (CIPE/CPD) - Certified Plant Engineer (CPE) #4495 - LEED Accredited Professional #1034966 Registered Mechanical Inspector #1239 - Registered Mechanical Plans Examiner #476 South Dade Cultural Arts Center Miami, FL Mechanical, Electrical, Plumbing and Fire Protection design for 1,500 seat theater building and adjoining multi-purpose building. Design for replacement of existing electrical generator. $1,500,000.00 Clubhouse Mechanical, Electrical, Fire Protection and Plumbing design and drafting. Parking lot lighting design and drafting. Construction Administration to include: (8) site visits during construction, response to RFI’s and Shop Drawing Review. Updating the site background on our plans and to modify the parking lot lighting design and photometric to accommodate with changes due to existing environmental issues on site. This job is now required to have a “mat” placed over the existing soils and an additional 12 inches of soil added to the site on top of that and then soded. The pool deck elevation and the parking lot elevation will remain unchanged. However, they will be rising the finished floor elevation at the pool e Construction Documents: -Site Visits -Electrical & Plumbing Design & Drafting for one park shelter Construction Administration -pre-bid meeting -pre construction meeting -2 inspections during construction -final inspection -show drawing review -response to RFIs Medical Examiner Building (Emergency Generator) Optimist Park Clubhouse, Miami Lakes, FL Curtis Park Pool, Miami FL Domino Park, Miami Beach , FL State of Florida: Professional Engineer # 40869 General Contractor #CG-C060225 Certified Plans Examiner #PX-0001324 Certified Inspector # BN-0003018 Principal-in-charge 39 26 2006-2009 2010 2014-2017 N/A 2010-2015 N/A2010-2014 N/A2015 N/A Page 48 12. NAME 13. ROLE IN THIS CONTRACT 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE b. WITH CURRENT FIRMa. TOTAL 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) 15. FIRM NAME AND LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 2 a. b. c. d. (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) e. Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Charles T. Yost Basulto & Associates, Inc. Consulting Engineers Miami Lakes, Florida Florida Atlantic University College of Engineering Major: Electrical Engineering Broward Community College College of Engineering Degree: Associates in Science in Electrical Engineering International Code Council: Registered Electrical Inspector Registered Electrical Plan Examiner South Dade Cultural Arts Center Miami, FL Mechanical, Electrical, Plumbing and Fire Protection design for 1,500 seat theater building and adjoining multi-purpose building. Mechanical, Electrical, Plumbing and Fire Protection design for the new baseball stadium, training facilities, locker rooms and field sports lighting. Updating the site background on our plans and to modify the parking lot lighting design and photometric to accommodate with changes due to existing environmental issues on site. This job is now required to have a “mat” placed over the existing soils and an additional 12 inches of soil added to the site on top of that and then soded. The pool deck elevation and the parking lot elevation will remain unchanged. However, they will be rising the finished floor elevation at the pool e Clubhouse Mechanical, Electrical, Fire Protection and Plumbing design and drafting. Parking lot lighting design and drafting. Construction Administration to include: (8) site visits during construction, response to RFI’s and Shop Drawing Review. Street Lighting Design and Construction Administration. Gulliver Academy Baseball Stadium Miami, FL Curtis Park Pool Optimist Park Clubhouse NW 145th Place Beacon Logistics Park State of Florida Certified Plans Examiner #PX1297 State of Florida Certified Inspector #BN2943 Electrical Engineer 38 24 2006-2009 2010 2008 2010 2010-2014 N/A2012-2015 2017 N/A Page 49 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Craig C. Clevenger, PG 13. ROLE IN THIS CONTRACT Project Director/Manager Petroleum & Hazardous Materials Assessment / Remediation-Task Lead 14. YEARS EXPERIENCE a. TOTAL 32 b. WITH CURRENT FIRM: 22 15. FIRM NAME AND LOCATION (City and State) Gallagher Bassett Services, Inc. - Miami Lakes, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) Bachelor of Science, Comprehensive Geology, 1987 Southwest Missouri State University, Springfield, Missouri Graduate Studies in Advanced Hydrogeology, 1988 University of Missouri, Columbia, Missouri 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Florida Professional Geologist: Florida # PG1666 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 1993/40-Hour OSHA Hazmat Training 1996/8-Hour OSHA Supervisor Hazmat Training FDEP 24-Hour Oil Spill Prevention, Response, Control & Cleanup, 1990 19. RELEVANT PROJECTS a. 21. TITLE AND LOCATION (City and State) 500 Alton Road, Miami Beach, Miami-Dade County, FL 33139 (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) July 2019 – May 2020 N/A 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Project Director: Gallagher Bassett Technical Services Division (GBTS) provided Interim Source Removal (ISR) including performing frequent and ongoing environmental consulting services. Services included: Submitted an Environmental Due Diligence Package to DERM on behalf of client; Submitted Supplemental PH2 and provided Soil Sampling and Site Assessment Reports Addendum (SARA). Cost: $60,000 Size: 2 Blocks b. 21. TITLE AND LOCATION (City and State) Maurice Gibbs Memorial Park, Miami Beach, Miami-Dade County, Florida, 1700 Purdy Avenue, Miami Beach, FL 33139 (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) January 2020 - Ongoing N/A 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Project Director: Gallagher Bassett Technical Services Division (GBTS) has been performing frequent and ongoing environmental consulting services throughout the project during the design of the Maurice Gibbs Memorial Park. Tasks include: Review records obtained from Miami-Dade County DERM and to develop a background of the site and understanding of the team’s redevelopment objectives; Participate in all meetings providing consultation and prepare reports as needed; Provide a professional geologist to prepare a budget for remediation, monitoring, and Engineering Control Maintenance inspections; Prepare a Soil Management Plan and Engineering Control Plan including a Dust Control Plan, Air Monitoring Plan, and a Health and Safety Plan . Cost: $25,231 Size: 140 feet (ft) by 140 ft c. 21. TITLE AND LOCATION (City and State) Future Community Park (Former Par 3)- Located near West 28th Street & Prairie Avenue, Miami Beach, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) January 2020 - Ongoing N/A 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Page 50 Project Director: GBTS has been performing frequent and ongoing environmental consulting services. Services include the following: Site Assessment Report Addendum (SARA), which included a groundwater Monitoring Only Plan. Retained a Florida-licensed well drilling contractor to install six permanent monitoring wells. Collect groundwater samples from up to 23 monitoring wells. Prepare a Soil Management Plan which included a Dust Control Plan, Air Monitoring Plan, Environmental Health and Safety Plan and an Engineering Control Plan / Engineering Control Maintenance Plan. Cost: $35,100 Size: Former Par 3 Golf Course (SW-1924) d. (4) TITLE AND LOCATION (City and State) SOUTH FLORIDA AFFORDABLE HOUSING DEVELOPER PORTFOLIO, BROWARD, MIAMI, AND PALM BEACH, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Ongoing N/A 3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project Director: GBTS managed a wide-range of environmental consulting services, including environmental due diligence services (Phase I ESAs, Phase II ESA, Asbestos-Containing Building Material Surveys, Lead-Based Paint Assessments, Indoor Air Quality and Mold Assessments), regulatory-driven environmental services (Site Assessment Reports, Remedial Action Plans, Source Removal, Tank Closure Assessments, Groundwater Monitoring Only Plans, and Engineering Control Verification), Brownfields Consulting Services, and mold-abatement services. Cost: $1,077,142 Size: Various Locations e. (1) TITLE AND LOCATION (City And State) ORANGE COUNTY SCHOOL BOARD ENVIRONMENTAL SERVICES ORANGE COUNTY, FLORIDA (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Ongoing NA 3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project Director: Conducted three-year re-inspections and six month surveillance inspections for asbestos for over 85 facilities. GBTS has also conducted initial asbestos inspections and developed management plans for buildings acquired by the School Board. Additionally, GBTS has provided indoor air quality and industrial hygiene assessments and services, lead base-paint assessment and hazardous materials consulting services. Cost: $514,403 Size: Approx. 85 Facilities f. (2) TITLE AND LOCATION (City and State) BREVARD COUNTY SCHOOL DISTRICT BREVARD COUNTY, FLORIDA (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 1998-Present N/A 3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project Director: GBTS has a multi-disciplinary environmental consulting contract to provide support for approximately 90 school campuses and ancillary facilities in Brevard County, Florida. Contract consists of, but is not limited to, hazardous materials consulting services, asbestos consulting services, underground storage tank management services, radon consulting, indoor air quality consulting, and emergency response for hurricane damage assessments. Cost: $50-250K/year Size: Approx. 90 Schools Page 51 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Adam B. Brosius 13. ROLE IN THIS CONTRACT Due Diligence and Site Assessment / Senior Technician 14. YEARS EXPERIENCE a. TOTAL 20 b. WITH CURRENT FIRM: 19 15. FIRM NAME AND LOCATION (City and State) Gallagher Bassett Services, Inc. - Miami Lakes, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) 40-Hour HAZMAT/Health & Safety Certified 8-Hour Supervisor /Management Certified Florida DEP SOP Training – Ground/Water, Surface Water, Waste Water, Sediment and Trace Metals NIOSH Phase Contrast Microscopy Certified 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City And State) Jacksonville Electric Authority South Generating Station / 801 Broadcast Place, Jacksonville (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2020 NA 3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm GBTS performed a Phase I ESA and Phase II ESA on the former JEA facility. The Phase II ESA included soil, groundwater, surface water and effluent sampling. The project goals were to determine extent of impact s ahead of the redevelopment of the property with a multi-million dollar commercial and residential complex. Cost: $62,000 Role: Staff Professional / Senior Technician b. (1) TITLE AND LOCATION (City and State) Lucayna Presbyterian Church /G9JC+8F Freeport, Bahamas (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2019 N/A 3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm GBTS delivered food and emergency supplies following Hurricane Dorian in 2019. GBTS also collected and had analyzed drinking water samples from the church’s well to determine potable use, as the island’s public water supply was non-functional following the storm. Cost: Charitable Role: Staff Professional / Senior Technician c. (1) TITLE AND LOCATION (City and State) CITY OF FORT LAUDERDALE ENVIRONMENTAL ENGINEERING CONSULTING SERVICES, Fort Lauderdale, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 1998-2016 N/A 3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm GBTS was retained by the City of Fort Lauderdale to provide Environmental Consulting Services associated with the Brownfields Pilot Grant, awarded by the Environmental Protection Agency (EPA). The focus of this project was three main areas of the Brownfie lds Area, including a proposed Linear Park located along the FEC Railroad, the Lincoln Park area (a former incinerator which was currently under-developed and was impacted by the perceived presence of contamination), and a general Environmental Inventory of designated commercial strips throughout the Brownfields Area. Page 52 For the Lincoln Park Project, GBTS prepared a Phase I Environmental Site Assessment, an EPA-required Quality Assurance Project Plan (QAPP), and a Preliminary Phase II Environmental Site Assessment. Expanded soil and groundwater assessment and consideration of a feasibility study and risk assessment were conducted in 2001 and 2002. GBTS served as a liaison between C FL, FDEP and community activist groups who were concerned about public health issues. Based on GBTS’s research and advice, the park was closed to public access, and negotiations conducted with FDEP to develop a Risk-Based Corrective Action (RBCA) closure solution. GBTS prepared a Conceptual Remedial Action Plan in 2003/2004, whi ch was approved by the FDEP. The protective cap was installed and the Park redesigned and reopened. Subsequently, GBTS completed the assessment of the former Trash Transfer Station site and adjoining Durrs Neighborhood, and implemented a remediation/cappi ng project in the adjoining right-of-way and on two residential properties. GBTS is the process of implementing the long -term groundwater monitoring plan, assisting the City Attorney’s office with drafting Restrictive Covenants, and providing technical as sistance for potential litigation. For the Linear Park Project, GBTS conducted a Limited Phase I ESA and Environmental Inventory for the commercial properties located along the FEC Railroad corridor. The findings were presented in a GIS-format, which were used to help design the footprint of the proposed Linear Park. The remaining grant funds were used for several other Limited Phase I ESA/ Environmental Inventory Studies throughout the Brownfields Area, with findings presented in a GIS format. Addition ally, GBTS subcontracted Dickey Consulting to manage the Environmental Justice portion of the Brownfields Pilot Grant. Cost: $150,000 - Petroleum Remediation / Cost: $120,000 - Brownfields Assessment / Cost: $1,200,000 – Lincoln Park Complex Assessment & Remediation Project / Role: Senior Technician d. (3) TITLE AND LOCATION (City and State) SOUTH FLORIDA AFFORDABLE HOUSING DEVELOPER PORTFOLIO - ENVIRONMENTAL SERVICES, VARIOUS COUNTIES, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2004 - Ongoing N/A 3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project Professional: GBTS has an ongoing relationship with Pinnacle Housing Group to provide environmental consulting servi ces related to their acquisition, financing, and redevelopment projects in Florida. The bulk of the work was completed in Broward and Miami-Dade Counties, but also extends northward into Palm Beach and Martin Counties. GBTS performs a wide-range of environmental consulting services, including radon surveys, environmental due diligence services (Phase I ESAs, Phase II ESA, Asbestos-Containing Building Material Surveys, Lead-Based Paint Assessments, Indoor Air Quality and Mold Assessments), regulatory-driven environmental services (Site Assessment Reports, Remedial Action Plans, Source Removal, Tank Closure Assessments, Groundwater Monitoring Only Plans, and Engineering Control Verification), Brownfields Consulting Services, and mold- abatement services. GBTS has conducted Radon Screening of the ground floor units at several apartment complexes, and retail strips. The units were tested for the presence of radon gas using charcoal adsorption devices. Cost: $1,077,142 Role: Staff Professional / Senior Technician e. (4) TITLE AND LOCATION (City and State) Great Salt Pond Municipal Solid Waste Landfill and Hurricane Irma Debris Site / Soualiga Road, St. Maarten (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2020 N/A 3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm GBTS conducted a Baseline Environmental Assessment, which was part of an overall Environmental Impact Site Assessment. The assessment included soil, groundwater, vapor and surface water sampling. The goals were to establish the baseline environmental conditions prior to the redevelopment of the landfill and the performance of fire suppression activities. Cost: $34,000 Role: Staff Professional / Senior Technician Page 53 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Pedro Martinez, PSM 13. ROLE IN THIS CONTRACT Land Surveyor 14. YEARS EXPERIENCE a. TOTAL 41 b. WITH CURRENT FIRM 2001-2020 15. FIRM NAME AND LOCATION (City and State) Martinez & Martinez Enterprises, Inc. Hialeah, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Florida/Professional Surveyor and Mapper 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) NW 107 Avenue, Miami, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Topographic survey. b. (1) TITLE AND LOCATION (City and State) Rinker, Medley Area, Miami, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Quantity survey. c. (1) TITLE AND LOCATION (City and State) Alliage Condominium, Miami, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Condominium survey. d. (1) TITLE AND LOCATION (City and State) Baptist Medical Plaza, Doral, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Provided construction stake-out fir site development. e. (1) TITLE AND LOCATION (City and State) Broward County Artificial Reefs, Broward County, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2003 CONSTRUCTION (If applicable) 2003 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm As-built survey of 10.6 acres of artificial reed constructed offshore of Dania Beach and Hollywood. f. (1) TITLE AND LOCATION (City and State) Menendez Avenue, Coral Gables, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2004 CONSTRUCTION (If applicable) Pending (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Topographic survey for the design of a sewer force main extension along the public right of way. g. (1) TITLE AND LOCATION (City and State) Kinkos, Doral, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Performed boundary survey for storefront and retail location. h. (1) TITLE AND LOCATION (City and State) Budget Mini Storage, Miami Gardens, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Performed specific purpose survey of the site. STANDARD FORM 330 (1/2004) PAGE 2 Page 54 STANDARD FORM 330 (REV. 8/2016) PAGE 1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Barry R. Miller, ASLA Principal in Charge a. TOTAL b. WITH CURRENT FIRM 34 26 15. FIRM NAME AND LOCATION (City and State) Savino & Miller Design Studio, P.A., North Miami, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION)17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) University of Florida ( Master Of Urban and Regional Planning) University of Florida (Bachelor in Landscape Architecture) Registered Landsape Architect: Florida #866 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) ASLA 12 FLASLA Awards, among other awards 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED Aventura Optima Green Roof Aventura, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2010-2014 2012-2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm Landscape Master Plan and two green roof terraces. This is one of 2 buildings in South Florida to obtain Leed Platinum. Scope: SD-CA, Planting, Hardscape, Water Feature, Lighting. Principal in Charge. 2015 FL ASLA Award of Merit, 2015 Award of Excellence for Green Roof by Green Roof for Healthy Cities (NYC) b. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED Miami Beach City Hall Center Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2010 2012 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm Located adjacent to City Hall in the City of Miami Beach, scope included a Landscape and Streetscape Master plan linking new garage, City Hall and existing office building, through a bamboo promenade, an plaza, with a water feature. Scope: SD-CA, Planting, Hardscape, Water Feature, Lighting and Urban Furniture. Principal in Charge. 2015 FL ASLA Award of Merit. c. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETEDAventura Park Square Aventura, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2014-2016 2016-2018 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm 1.2 million square foot urban village with residential, retail and office use. Streetscape, plazas and landscape areas are inte- grated with the architecture to create a dynamic outdoor environment that promotes community cohesion. Scope: SD-CD, Planting, Hardscape, Site Furniture, Lighting and Water Features. Principal - Landscape Architect d. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED West Avenue Streetscape Phase III-IV Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2017-present In Progress (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm Streetscape improvements for major thoroughfare in Miami Beach, West Avenue, and all of its side streets. Improvements are being done as Design-Build project to raise the street 1’-2’. Scope: SD-CA, Planting, Hardscape. Principal in Charge. e. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED Maurice A. Ferre Park Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2012 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm Re-designed and valued engineered proposed Baywalk and Entry promenade to keep integrity of original Concept. Scope included Paving, Planting, Irrigation, Urban furniture and lighting. Scope: SD-CA, Planting, Hardscape, Water Feature, Lighting and Urban Furniture (19 Acres) Cost: $10M. Principal in Charge. 2015 FL ASLA Award of Merit. Page 55 STANDARD FORM 330 (REV. 8/2016) PAGE 2 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Adriana Savino-Miller Principal - Master Planning a. TOTAL b. WITH CURRENT FIRM 30 26 15. FIRM NAME AND LOCATION (City and State) Savino & Miller Design Studio, P.A., North Miami, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION)17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) University of Pennsylvania, M. Arch + Urban Design Certificate Universidad Central de Venezuela, Architecture Registered Architect, Florida AR#14444 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) AIA Member 12 FLASLA Awards, among others 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED City of Miami Beach Future Community Park Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2016-present (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm The goal of this 19-acre park project is to improve the quality of life by becoming a model of resiliency and sustainability for the City, while serving as a place for recreation and fitness, quiet contemplation, community gathering and cultural enhance- ment. Scope: Scope: SD-CA, Hardscape, Planting, Site Furniture, Water Feature, Lighting. Principal - Master Planning b. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED Miami Baywalk & Riverwalk Design Guidelines Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2017-2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm The Miami Baywalk & Riverwalk Design Guidelines was conceived to transform 4.5 miles of often hidden, publicly accessible waterfront into a vibrant, resilient, and connected waterfront. A lengthy analysis and public outreach process led to the creation of a family of unifying design elements and guidelines that adopt the latest approach in sustainability and resiliency strategies. Scope: Design Guidelines and Brand Development. Principal - Urban Designer c. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETEDMatheson Plantation Village Key Biscayne, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Master plan through the restoration of three historic cottages, a reminiscence of Key Biscayne when the Matheson Family donated land to the County. The plan calls for a sustainable village that exemplifies cultivation, conservation and stewardship of the land with activities that recall Key Biscayne’s past, including the zoo, first introduced by the Mathesons. Associate d. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETEDMuseum Park Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2015 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Re-designed and valued engineered proposed Baywalk and Entry promenade to keep integrity of original Concept. Scope included Paving, Planting, Irrigation, Urban furniture and lighting. Scope: SD-CA, Planting, Hardscape, Water Feature, Lighting and Urban Furniture (19 Acres) Cost: $10M. Principal - Master Planning. e. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETEDTamiami Canal Tender House Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2013 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firmSite analysis and presentation of multiple options for site design, including whether to remove or replace the historic swing bridge, how many lanes for new bridge and relocation of tender house. Design of new tender house and bridge railing. Design Architect and Urban Designer Page 56 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Joaquin E. Vargas 13. ROLE IN THIS CONTRACT Transportation/Traffic Engineer 14. YEARS OF EXPERIENCE a. TOTAL 33 b. WITH CURRENT FIRM 15 15. FIRM NAME AND LOCATION (City and State)TRAF TECH ENGINEERING, INC. (TAMARAC, FLORIDA) 16. EDUCATION (DEGREE AND SPECIALIZATION) BSCE (Civil Engineer) MSCE (Transportation Engineer) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) PE Florida 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Institute of Transportation Engineers (Member), Traffic Simulation Training, Published article on Echelon Interchange (Urban Interchanges) 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Traffic Consultant for City of Coral Springs (2) YEAR COMPLETED PROFESSIONAL SERVICES On-going CONSTRUCTION (If applicable) (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Review traffic studies and site plans from a traffic standpoint Check if project performed with current firm b. (1) TITLE AND LOCATION (City and State) Traffic Consultant for City of Sunrise (2) YEAR COMPLETED PROFESSIONAL SERVICES On-Going CONSTRUCTION (If applicable) (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Review traffic studies and site plans from a traffic standpoint Check if project performed with current firm c. (1) TITLE AND LOCATION (City and State) City of Oakland Park (2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (If applicable) (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Conducted lane-reduction study for Powerline Road from Oakland Park Boulevard to Commercial Boulevard Check if project performed with current firm d. (1) TITLE AND LOCATION (City and State) Traffic Consultant for City of Tamarac (2) YEAR COMPLETED PROFESSIONAL SERVICES On-Going CONSTRUCTION (If applicable) (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Review traffic studies and site plans from a traffic standpoint Check if project performed with current firm e. (1) TITLE AND LOCATION (City and State) Town of Lauderdale-By-The-Sea (2) YEAR COMPLETED PROFESSIONAL SERVICES 2014 CONSTRUCTION (If applicable) (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Consulting Services to implement pedestrian-only signal phase at East Commercial Boulevard and SR A1A Check if project performed with current firm STANDARD FROM 330 (6/2004)PAGE 3 X X X X X Page 57 STANDARD FORM 330 (8/2016) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20.EXAMPLE PROJECT KEY NUMBER 1 21. TITLE AND LOCATION (City and State) Sunny Isles Beach ManagementSunny Isles Beach ManagementSunny Isles Beach ManagementSunny Isles Beach Management and Shoreline Stabilization Studyand Shoreline Stabilization Studyand Shoreline Stabilization Studyand Shoreline Stabilization Study, , , , MiamiMiamiMiamiMiami----Dade CountyDade CountyDade CountyDade County, Florida, Florida, Florida, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES 2009 CONSTRUCTION (If applicable) N/A 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, Florida 33160 b. POINT OF CONTACT NAME Ms. Susan Simpson c. POINT OF CONTACT TELEPHONE NUMBER Tel: (305) 957-1306 Email: ssimpson@sibfl.net 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Coastal Systems conducted an analysis of coastal processes at Sunny Isles Beach to provide recommendations for future beach management. Long term and storm-induced beach erosion along the 2.5 miles of City of Sunny Isles Beach requires frequent and costly maintenance with beach nourishment. Beach compatible sand sources in Florida are diminishing, and long-term stabilization of hot spot areas and reduction in beach nourishment event frequency overall may be beneficial in maintaining adequate beach width for shore protection and for recreational use. Coastal Systems conducted a comprehensive coastal engineering study for Sunny Isles to evaluate coastal processes along the shoreline of Sunny Isles. Detailed hydrographic surveys of two existing submerged breakwaters were conducted along with beach profiling to provide data for input into the numerical modeling software. Offshore wave statistics were prepared utilizing wave data from 1980-1999 to obtain annual conditions that influence sediment transport. Wave modeling was conducted by utilizing the Danish Hydraulics Institute (DHI) MIKE-21 Spectral Wave (SW) model to simulate offshore waves propagating onshore. This model was coupled with the MIKE-21 Hydrodynamic (HD) model to determine the littoral current generated by breaking waves. The resulting sediment transport was evaluated to identify erosion trends along the shoreline. The numerical modeling results indicated that the north segment is characterized with the highest degree of erosion, while the south section was mildly erosional, and the middle section was relatively stable. Two hot spots were identified in the northern section, and wave focusing results were evaluated. Beach management recommendations were prepared based on the coastal engineering results, and coastal structure concepts were prepared for shore stabilization. Additional beach management recommendations were provided as longer-term solutions to reduce erosion rates, mitigate local hot spots, and to extend the life of beach nourishment projects. Coastal Systems conducted a review of completed or planned beach management projects in the Tri-County area to update the Phase I Study as part of the Phase II – Coastal Structures Feasibility Study. An evaluation of existing beach management projects incorporating coastal structures in the Tri-County area was completed as part of the Phase II Study. The history and performance of these structures showed that similar projects may be feasible to stabilize the shoreline in Sunny Isles Beach. The current status and regulatory challenges associated with obtaining environmental permits for these projects, as they relate to potential projects within Sunny Isles Beach, was performed and showed that coastal structures are permittable if the impacts of said structures are avoided and minimized. Page 58 STANDARD FORM 330 (8/2016) PAGE 3 A beach performance evaluation was also completed as part of the Phase II Study to quantify shoreline changes and sediment transport between Port Everglades and Baker’s Haulover Inlet. The regional evaluation of sediment transport was completed to quantify the amount of sand movement along the beaches of Sunny Isles Beach, as well as along the updrift and downdrift beaches and adjacent to the Newport Pier. A review of innovative technologies for beach management was conducted to evaluate their effectiveness for the beaches of Sunny Isles Beach. A beach management strategy was developed which included beach nourishment, coastal structures, data collection, and outreach. Coastal Systems has also provided consulting services to the City of Sunny Isles Beach regarding evaluation of potential alternative sand sources for placement on the beach, including material excavated from upland development sites within a noncontiguous municipality. These services included sand compatibility review and permitting strategy. Coastal Systems conducted an underwater investigation of submerged breakwaters located offshore of the City of Sunny Isles Beach. The structural assessment evaluated the condition of the existing breakwaters, collected representative measurements of the existing structures, and summarized the findings in an Engineering Assessment Report. The results confirmed significant settlement and displacement of the armor stone had occurred likely reducing the effectiveness of the structures for shoreline stabilization. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Coastal Systems International, Inc.Coastal Systems International, Inc.Coastal Systems International, Inc.Coastal Systems International, Inc. (2) FIRM LOCATION Coral Gables, FloridaCoral Gables, FloridaCoral Gables, FloridaCoral Gables, Florida (3) ROLE CoastalCoastalCoastalCoastal/ Marine / Marine / Marine / Marine EngineeringEngineeringEngineeringEngineering Coastal Engineering Hydrographic Surveying RELEVANT SERVICES: RELEVANT SERVICES: RELEVANT SERVICES: RELEVANT SERVICES: CLIENT:CLIENT:CLIENT:CLIENT: City of Sunny Isles Beach PROJECT SCHEDULE:PROJECT SCHEDULE:PROJECT SCHEDULE:PROJECT SCHEDULE: 2008 - 2009 CONSTRUCTION COST:CONSTRUCTION COST:CONSTRUCTION COST:CONSTRUCTION COST: N/A Page 59 STANDARD FORM 330 (8/2016) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20.EXAMPLE PROJECT KEY NUMBER 2 21. TITLE AND LOCATION (City and State) Coastal Inundation and Economic Vulnerability Study, Bal Harbour, Coastal Inundation and Economic Vulnerability Study, Bal Harbour, Coastal Inundation and Economic Vulnerability Study, Bal Harbour, Coastal Inundation and Economic Vulnerability Study, Bal Harbour, FloridaFloridaFloridaFlorida 22. YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) N/A 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER Bal Harbour Village 655 96th St. Bal Harbour, FL 33154 b. POINT OF CONTACT NAME Mr. John Oldenburg c. POINT OF CONTACT TELEPHONE NUMBER Tel: (305) 993-7436 Email: joldenburg@balharbourfl.gov 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Coastal Systems is performing a grant-funded Inundation and Economic Vulnerability study, which assesses the Village of Bal Harbour’s vulnerability to sea level rise and storm surge under various future scenarios. Coastal Systems procured the Resilience Planning Grant from the Florida Department of Environmental Protection’s (FDEP) Florida Resilient Coastlines Program, on behalf of the Village. Coastal Systems held an Introductory Public Workshop to introduce Village residents, officials and stakeholders to the scope of the study. Coastal Systems compiled a Resilience GIS Database, which includes property values, land use, ground elevations, finished floor elevations, and drainage and roadway infrastructure. Coastal Systems conducted Inundation Modeling to determine the flooding risks for the Village associated with rainfall, King Tides, and various interval storms (25-, 50-, and 100-year storms) through 2080, with sea level rise. Coastal Systems analyzed the potential economic impact associated with the inundation scenarios. Coastal Systems annualized the probable damage cost to infrastructure to understand the potential damages to a building in any given year, with sea level rise. The annual maintenance costs of public infrastructure, including roads, utilities, beach/dune system, and parks were projected to understand the future increases in costs due to increasing sea level elevations. Coastal Systems produced a Vulnerability Ratio to project future potential reductions in property value and compared the future potential reductions in property value to the annual operating budget of the Village to project future impacts to the Village revenues. The future maintenance costs of public infrastructure were compared to the annual operating budget of the Village to project future increases in Village expenditures. Coastal Systems is concluding the Study with a final Public Workshop to present results and conclusions. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Coastal Systems International, Inc.Coastal Systems International, Inc.Coastal Systems International, Inc.Coastal Systems International, Inc. (2) FIRM LOCATION Coral Gables, FloridaCoral Gables, FloridaCoral Gables, FloridaCoral Gables, Florida (3) ROLE Coastal & Stormwater Coastal & Stormwater Coastal & Stormwater Coastal & Stormwater ModelingModelingModelingModeling Coastal Modeling Stormwater Modeling Data Management (GIS) RELEVANT SERVICES: RELEVANT SERVICES: RELEVANT SERVICES: RELEVANT SERVICES: Resiliency Economics Grant Funding Public Meetings CLIENT:CLIENT:CLIENT:CLIENT: Bal Harbour Village PROJECT SCHEDULE:PROJECT SCHEDULE:PROJECT SCHEDULE:PROJECT SCHEDULE: 2019 - 2020 CONSTRUCTION COST:CONSTRUCTION COST:CONSTRUCTION COST:CONSTRUCTION COST: N/A Page 60 STANDARD FORM 330 (8/2016) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20.EXAMPLE PROJECT KEY NUMBER 3 21. TITLE AND LOCATION (City and State) Haulover Marine Center, North Miami Beach, FloridaHaulover Marine Center, North Miami Beach, FloridaHaulover Marine Center, North Miami Beach, FloridaHaulover Marine Center, North Miami Beach, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) 2016 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER Miami-Dade County Parks 275 NW 2nd Street, Suite 407 Miami, Florida 33128 b. POINT OF CONTACT NAME Ms. Lydia Salas c. POINT OF CONTACT TELEPHONE NUMBER Tel: (305) 755-5456 Email: lydias@miamidade.gov 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Coastal Systems was part of the planning and designed the site/civil and marine structural improvements for the redevelopment of Haulover Marine Center. The redevelopment consists of a new marina facility with a combination of temporary wet and dry slips, and 280 feet of bulkhead. The dry storage building provides a total capacity of approximately 560 dry slips. Additional facilities include marina offices, store and service areas. Coastal Systems provided site/civil design for the 10-acre site including paving, grading and stormwater management, parking lot design for 680 spaces, water and sanitary sewer design, utility coordination with the City of North Miami Beach, and construction administration services. A 12” water main was designed to service the site and provide fire protection. The drainage system was designed with exfiltration trenchs for pre-treatment, the use of 4 existing drainage wells and a new 48” outfall for overflow. The marine structural design involved a new seawall and dredging. A pile-supported concrete slab was designed for the largest boat forklift at the time. Floating docks were used for staging of the boats during launch and retrieval. Civil permits were obtained through Miami-Dade County Parks and Recreation, North Miami Beach Water and Sewer and Miami-Dade County Building Department. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Coastal Coastal Coastal Coastal Systems Systems Systems Systems International, Inc.International, Inc.International, Inc.International, Inc. (2) FIRM LOCATION Coral Gables, FloridaCoral Gables, FloridaCoral Gables, FloridaCoral Gables, Florida (3) ROLE Civil Civil Civil Civil & Marine Structural & Marine Structural & Marine Structural & Marine Structural EngineeringEngineeringEngineeringEngineering Civil Engineering Stormwater Management Structural Investigation Marine Structural Engineering RELEVANT SERVICES: RELEVANT SERVICES: RELEVANT SERVICES: RELEVANT SERVICES: Civil Permitting Utility Design Construction Administration CLIENT:CLIENT:CLIENT:CLIENT: Westrec Marinas PROJECT PROJECT PROJECT PROJECT SCHEDULE:SCHEDULE:SCHEDULE:SCHEDULE: 2010 - 2016 CONSTRUCTION COST:CONSTRUCTION COST:CONSTRUCTION COST:CONSTRUCTION COST: $150M Page 61 STANDARD FORM 330 (8/2016) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20.EXAMPLE PROJECT KEY NUMBER 4 21. TITLE AND LOCATION (City and State) Maurice A. Ferré Park, Miami, FloridaMaurice A. Ferré Park, Miami, FloridaMaurice A. Ferré Park, Miami, FloridaMaurice A. Ferré Park, Miami, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) 2019 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Miami Capital Improvements Program 444 SW 2nd Avenue, 8th Floor Miami, Florida 33130 b. POINT OF CONTACT NAME Mr. John De Pazos c. POINT OF CONTACT TELEPHONE NUMBER Tel: (305) 416-1094 Email: jdepazos@miamidade.gov 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Coastal Systems led a multi-disciplinary team in the design of 24 acres of Maurice A. Ferré Park. Maurice A. Ferré Park was planned by the City of Miami as a waterfront revitalization in the heart of downtown on Biscayne Bay. The $11.5M park incorporates a waterfront promenade, Baywalk and plaza. Coastal Systems provided civil engineering and environmental permitting services. The stormwater management system consists of a combination of exfiltration trenches, retention area within the park, and outfalls to the bay. The stormwater system was designed to meet the stringent guidelines for treating stormwater runoff on-site for this waterfront park that is adjacent to the environmentally sensitive Biscayne Bay. An Environmental Resource Permit (ERP) was processed through Miami-Dade County Regulatory and Economic Resources (RER) for the stormwater management system. Coastal Systems also prepared and processed the NPDES and FDOT permits for the project. Potable water and sanitary sewer utility services were also designed for the Park. Service connections were coordinated with Miami-Dade County WASD which included the preparation of documents for the service agreement with the City. Easements for the new water lines, including fire hydrants, were established, and designed. Due to the site’s historical use as the original Port of Miami, contaminated soils were present in the form of petroleum and arsenic. Coastal Systems led the environmental team in preparing a soil management plan to bring the site into compliance and provide a clean and safe environment for the public’s use. The park’s Louis Poulsen light fixtures and Baywalk design are now established as the design standard by the Downtown Development Authority (DDA) for the proposed City Baywalk-Riverwalk to encompass Biscayne Bay and the Miami River. Apart from the upland development, the large vessel mooring facility, located within the existing basin adjacent to the American Airlines Arena, was also designed and permitted by Coastal Systems. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Coastal Systems International, Inc.Coastal Systems International, Inc.Coastal Systems International, Inc.Coastal Systems International, Inc. (2) FIRM LOCATION Coral Gables, FloridaCoral Gables, FloridaCoral Gables, FloridaCoral Gables, Florida (3) ROLE PrimePrimePrimePrime b. (1) FIRM NAME Gallagher Bassett Technical ServicesGallagher Bassett Technical ServicesGallagher Bassett Technical ServicesGallagher Bassett Technical Services, Inc., Inc., Inc., Inc. (2) FIRM LOCATION TamaracTamaracTamaracTamarac, Florida, Florida, Florida, Florida (3) ROLE SubconsultantSubconsultantSubconsultantSubconsultant c. (1) FIRM NAME Savino & Miller Design StudioSavino & Miller Design StudioSavino & Miller Design StudioSavino & Miller Design Studio, Inc., Inc., Inc., Inc. (2) FIRM LOCATION North MiamiNorth MiamiNorth MiamiNorth Miami, Florida, Florida, Florida, Florida (3) ROLE SubconsultantSubconsultantSubconsultantSubconsultant Civil Engineering Stormwater Management Utility Design Construction Administration Bidding Environmental Permitting Soil Management Plan Coordination RELEVANT SERVICES: RELEVANT SERVICES: RELEVANT SERVICES: RELEVANT SERVICES: CLIENT:CLIENT:CLIENT:CLIENT: City of Miami PROJECT SCHEDULE:PROJECT SCHEDULE:PROJECT SCHEDULE:PROJECT SCHEDULE: 2009 – 2019 CONSTRUCTION COST:CONSTRUCTION COST:CONSTRUCTION COST:CONSTRUCTION COST: $11.5M American Society of Civil Engineers – Civil Engineering Project of the Year (2014-2015) Page 62 STANDARD FORM 330 (8/2016) PAGE 3 d. (1) FIRM NAME Ardaman & AssociatesArdaman & AssociatesArdaman & AssociatesArdaman & Associates, Inc., Inc., Inc., Inc. (2) FIRM LOCATION HialeahHialeahHialeahHialeah, Florida, Florida, Florida, Florida (3) ROLE SubconsultantSubconsultantSubconsultantSubconsultant e. (1) FIRM NAME Martinez & Martinez, Inc.Martinez & Martinez, Inc.Martinez & Martinez, Inc.Martinez & Martinez, Inc. (2) FIRM LOCATION HialeahHialeahHialeahHialeah , Florida, Florida, Florida, Florida (3) ROLE SubconsultantSubconsultantSubconsultantSubconsultant Page 63 STANDARD FORM 330 (8/2016) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20.EXAMPLE PROJECT KEY NUMBER 5 21. TITLE AND LOCATION (City and State) Rickenbacker Causeway Recreational Corridor, MiamiRickenbacker Causeway Recreational Corridor, MiamiRickenbacker Causeway Recreational Corridor, MiamiRickenbacker Causeway Recreational Corridor, Miami----Dade Dade Dade Dade CountyCountyCountyCounty, Florida, Florida, Florida, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES 2011 CONSTRUCTION (If applicable) 2011 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER Miami-Dade County Parks 4299 Rickenbacker Causeway Key Biscayne, Florida 33149 b. POINT OF CONTACT NAME Mr. James Martincak c. POINT OF CONTACT TELEPHONE NUMBER Tel: (305) 361-2833 Email: james.martincak@miamidade.gov 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Rickenbacker Causeway connects Key Biscayne to downtown Miami, crossing historic Virginia Key and the artificial Hobie Island. The Causeway serves as an important transportation corridor, but also has approximately 2.5-miles of recreational shoreline. Coastal Systems provided field investigations, environmental permitting, coastal and civil engineering design and construction administration services. Field investigations were completed including hydrographic surveying and beach profiling. Marine resource (seagrass) surveys were conducted, as well as upland native and exotic vegetation mapping. Coastal engineering analyses were completed to determine winds, waves and sediment transport along the project shoreline. Designs were developed for shoreline stabilization including rock revetment, mangrove planter and beach nourishment stabilization. The beach nourishment was designed to avoid impacts to sensitive seagrass beds immediately adjacent to the project shoreline. Sand sources were evaluated based on geotechnical analyses to determine the most economical and compatible beach fill. Civil engineering services included upland paving and grading, as well as stormwater management improvements. The project combined an extensive upland exotic vegetation removal effort with replanting of native salt-tolerant species. In addition, mangrove planters were designed to enhance the shoreline and protect existing mangrove vegetation. An off-shore Outfall Box structure was designed to discharge upland storm overflow into the bay, while protecting the shoreline and marine life. This structure, protected by rock revetment, is designed to break down the energy of the storm water and discharge though several weep holes and a submerged open grate. The material is a prefab concrete structure, heavy enough to remain undisturbed and light enough to facilitate installation. The bay water flushes in and out through the stone armor, which is inaccessible to manatees. The open grate (non-corrosive material) flushes water out during high tide and is also used for inspection and maintenance purposes. Environmental regulatory permits were processed through Miami-Dade Division of Environmental Resources Management (DERM), the Florida Department of Environmental Protection (FDEP) and the U.S. Army Corps of Engineers (Corps). Coastal Systems prepared construction plans and specifications in conjunction with funding constraints and prioritized project elements established by the County. Construction was completed in 2011. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Coastal Systems International, Inc.Coastal Systems International, Inc.Coastal Systems International, Inc.Coastal Systems International, Inc. (2) FIRM LOCATION Coral Gables, FloridaCoral Gables, FloridaCoral Gables, FloridaCoral Gables, Florida (3) ROLE PrimePrimePrimePrime Field Investigations Coastal Engineering Stormwater Management CLIENT:CLIENT:CLIENT:CLIENT: Miami-Dade County Parks, Recreation and Open Spaces Mr. James Martincak 4299 Rickenbacker Causeway, Key Biscayne, FL 33149 Tel: (305) 361-2833 Email: James.Martincak@miamidade.gov PROJECT SCHEDULE:PROJECT SCHEDULE:PROJECT SCHEDULE:PROJECT SCHEDULE: 2009 - 2011 CONSTRUCTION COST:CONSTRUCTION COST:CONSTRUCTION COST:CONSTRUCTION COST: $8M RELEVANT SERVICES: RELEVANT SERVICES: RELEVANT SERVICES: RELEVANT SERVICES: Page 64 STANDARD FORM 330 (8/2016) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20.EXAMPLE PROJECT KEY NUMBER 6 21. TITLE AND LOCATION (City and State) Miracle Mile and Giralda Avenue Streetscape, Coral Gables, FloridaMiracle Mile and Giralda Avenue Streetscape, Coral Gables, FloridaMiracle Mile and Giralda Avenue Streetscape, Coral Gables, FloridaMiracle Mile and Giralda Avenue Streetscape, Coral Gables, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) 2018 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Coral Gables Public Works Department 2800 SW 72nd Avenue Miami, Florida 33155 b. POINT OF CONTACT NAME Cooper Robertson & Partners Mr. Donald Clinton c. POINT OF CONTACT TELEPHONE NUMBER Tel: (917) 542-0084 Email: dclinton@cooperrobertson.com 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The City of Coral Gables aimed to transform the public realm in the downtown area of Miracle Mile and Giralda Avenue and create a civic promenade to become the focal point for the region. The City hoped to achieve a more visitor-friendly downtown district that will be better poised for economic growth. Coastal Systems provided civil engineering, stormwater management design, civil permitting, and construction administration services for 11.55 acres of streetscape. The project involved an unconventional streetscape design. The landscape was designed to provide moisture and oxygen to the live oak trees by replacing the road and sidewalk base and providing underground irrigation with the use of structural soil (preventing roots from lifting the pavement). The curbless design presented several drainage challenges – specifically, the concern of runoff control to prevent flooding of the adjacent historic buildings. The drainage was designed with parallel drainage systems consisting of a continuous trench drain. The design utilizes Duraslot, which collects surface run-off by using a continuous linear grate. The Duraslot system collects stormwater runoff and discharges it through a series of parallel perforated pipes into the street drain field. A pervious pavement system utilizing crushed granite joints for pavers was also incorporated into the design. The combination of the unique streetscape and drainage design elements contributed to the project achieving a 100-year / 1-day storm discharge capacity prior to overflow into the City’s master drainage system. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Coastal Systems International, Inc.Coastal Systems International, Inc.Coastal Systems International, Inc.Coastal Systems International, Inc. (2) FIRM LOCATION Coral Gables, FloridaCoral Gables, FloridaCoral Gables, FloridaCoral Gables, Florida (3) ROLE Civil Civil Civil Civil EngineeringEngineeringEngineeringEngineering Civil Engineering Stormwater Management Civil Permitting Construction Administration RELEVANT SERVICES: RELEVANT SERVICES: RELEVANT SERVICES: RELEVANT SERVICES: CLIENT:CLIENT:CLIENT:CLIENT: Cooper Robertson & Partners PROJECT SCHEDULE:PROJECT SCHEDULE:PROJECT SCHEDULE:PROJECT SCHEDULE: 2015-2018 CONSTRUCTION COST:CONSTRUCTION COST:CONSTRUCTION COST:CONSTRUCTION COST: $21.6M Cuban American Association of Civil Engineers – Civil Engineering Project of the Year (2019) Page 65 STANDARD FORM 330 (8/2016) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20.EXAMPLE PROJECT KEY NUMBER 7 21. TITLE AND LOCATION (City and State) Beachwalk II,Beachwalk II,Beachwalk II,Beachwalk II, Miami Beach, FloridaMiami Beach, FloridaMiami Beach, FloridaMiami Beach, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) 2019 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Miami Beach Division of Environmental Resource Management 1700 Convention Center Drive Miami Beach, Florida 33139 b. POINT OF CONTACT NAME Ms. Elizabeth Wheaton c. POINT OF CONTACT TELEPHONE NUMBER Tel: (305) 673-7071 ext.6121 Email: elizabethwheaton@miamibeachfl.gov 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) A continuation of the City’s original Beachwalk project, Beachwalk II connects Lummus Park to the pedestrian path at the Continuum properties, south of South Pointe Drive. The 3,400-foot pedestrian and emergency access path encompasses 5 blocks, connecting 3 vital parks within the City’s South of Fifth neighborhood. The $3.1M Beachwalk path serves as a connection to re-energize the coastal development within the South of Fifth area while also formalizing the existing hardpack area between 5th Street and South Pointe Drive by encompassing: • Three (3) open-space parks (Lummus, Marjory Stoneman Douglas, and South Pointe) • The South of Fifth neighborhood • Coastal dune improvements and controlled beach access points Coastal Systems managed a multi-disciplinary team, and led in the planning, design, environmental/coastal permitting, bidding, and construction administration services for the project. Coastal Systems conducted public meetings with City residents to develop preliminary designs and renderings. Frangible materials, such as pavers and breakaway curbs, were utilized in the design. 4th and 5th Street end connections to the Beachwalk were also incorporated as part of the overall project design, connecting the path to Ocean Drive. As part of the strict regulations of the Coastal Construction Control Line (CCCL) program, marine turtle lighting consultation services were provided and the cut/fill of native sand was balanced on-site. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Coastal Systems International, Inc.Coastal Systems International, Inc.Coastal Systems International, Inc.Coastal Systems International, Inc. (2) FIRM LOCATION Coral Gables, FloridaCoral Gables, FloridaCoral Gables, FloridaCoral Gables, Florida (3) ROLE PrimePrimePrimePrime b. (1) FIRM NAME Basulto & AssociatesBasulto & AssociatesBasulto & AssociatesBasulto & Associates, Inc., Inc., Inc., Inc. (2) FIRM LOCATION Miami LakesMiami LakesMiami LakesMiami Lakes, Florida, Florida, Florida, Florida (3) ROLE SubconsultantSubconsultantSubconsultantSubconsultant Civil Engineering Utility Service Connections Bidding Construction Administration Public Meetings RELEVANT SERVICES: RELEVANT SERVICES: RELEVANT SERVICES: RELEVANT SERVICES: FDEP CCCL Permitting FDEP Field Permitting DERM Tree Permitting Marine Turtle Lighting CLIENT:CLIENT:CLIENT:CLIENT: City of Miami Beach PROJECT SCHEDULE:PROJECT SCHEDULE:PROJECT SCHEDULE:PROJECT SCHEDULE: 2008 - 2019 CONSTRUCTION COST:CONSTRUCTION COST:CONSTRUCTION COST:CONSTRUCTION COST: $3.1M Page 66 STANDARD FORM 330 (8/2016) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20.EXAMPLE PROJECT KEY NUMBER 8 21. TITLE AND LOCATION (City and State) Maurice GibbMaurice GibbMaurice GibbMaurice Gibb MemorialMemorialMemorialMemorial ParkParkParkPark, Miami Beach, Florida, Miami Beach, Florida, Miami Beach, Florida, Miami Beach, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) N/A 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Miami Beach 1700 Convention Center Drive Miami Beach, Florida 33139 b. POINT OF CONTACT NAME Ms. Colette Satchell c. POINT OF CONTACT TELEPHONE NUMBER Tel: (305) 673-7071 ext. 6401 Email: colettesatchell@miamibeachfl.gov 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Coastal Systems is leading a team of design professionals in the implementation of Maurice Gibb Memorial Park, located at 18th Street & Purdy Avenue. The City of Miami Beach aims to create a one-of-a-kind park, honoring Maurice Gibb of the Bee Gees, while incorporating sustainable and resilient design features. Coastal Systems developed the 2-acre park design while incorporating community feedback through multiple community meetings and workshops. The proposed improvements will include an outlook platform, fishing deck, shade structures, dog park, open sodded area, landscape, and an ADA children's play area designed by MONSTRUM, a custom playground manufacturer from Denmark. Coastal Systems is also designing a new seawall and enhancing the artificial reef by adding rip-rap, in order to create a living shoreline and enhance water quality. The overwater deck and handrails will be designed using recycled materials. Coastal Systems is providing the City with master planning, engineering design, environmental permitting, construction cost estimates, bidding/award assistance, and construction administration services. Coastal Systems is also leading the environmental sub-consultant to manage the testing and mitigation of contaminated soil at the site. Environmental permits are being processed through Miami-Dade County DERM, Florida Department of Environmental Protection, National Pollutant Discharge Elimination System (NPDES), U.S. Army Corps of Engineers and the City of Miami Beach. As part of the City’s resiliency and sustainability initiatives, Coastal Systems will consider and provide alternatives to incorporate into the park’s design: • Raising of the seawall to elevation +5.7’ NAVD to provide a continuous flood barrier. • Drainage system design using projected water levels in anticipation of sea level rise. • Soil management plan to replace/cap contaminated soils associated with the historical land use of the site. Civil Engineering Stormwater Management Environmental Permitting Soil Management Plan Coordination RELEVANT SERVICES: RELEVANT SERVICES: RELEVANT SERVICES: RELEVANT SERVICES: CLIENT:CLIENT:CLIENT:CLIENT: City of Miami Beach PROJECT SCHEDULE:PROJECT SCHEDULE:PROJECT SCHEDULE:PROJECT SCHEDULE: 2017 – present CONSTRUCTION COST:CONSTRUCTION COST:CONSTRUCTION COST:CONSTRUCTION COST: $6M (estimated) Coastal/Marine Engineering Bidding Construction Administration Public Meetings Page 67 STANDARD FORM 330 (8/2016) PAGE 3 Civil Engineering Stormwater Modeling RELEVANT SERVICES: RELEVANT SERVICES: RELEVANT SERVICES: RELEVANT SERVICES: Bidding Construction Administration CLIENT:CLIENT:CLIENT:CLIENT: Savino & Miller Design Studio PROJECT SCHEDULE:PROJECT SCHEDULE:PROJECT SCHEDULE:PROJECT SCHEDULE: 2017 – present CONSTRUCTION COST:CONSTRUCTION COST:CONSTRUCTION COST:CONSTRUCTION COST: $15.5M (estimated) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20.EXAMPLE PROJECT KEY NUMBER 9 21. TITLE AND LOCATION (City and State) BayshoreBayshoreBayshoreBayshore ParkParkParkPark, Miami Beach, Florida, Miami Beach, Florida, Miami Beach, Florida, Miami Beach, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) N/A 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Miami Beach 1700 Convention Center Drive Miami Beach, Florida 33139 b. POINT OF CONTACT NAME Mr. Barry Miller Savino & Miller Design Studio c. POINT OF CONTACT TELEPHONE NUMBER Tel: (305) 895-9082 Email: barry@savinomiller.com 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Coastal Systems is providing civil design and environmental permitting services for Bayshore Park, a community park in Miami Beach. Bayshore Park sets precedent in the City by promoting sustainable open space and water management practices. The purpose is to create a park of natural beauty for community enjoyment and enrichment, reflecting the City’s culture and ecology while serving as a model of sustainability, stewardship, and resilience. The proposed 20-acre park is planned to comprise of walking trails, a 3-acre lake, wetlands, boardwalks, open lawns, a playground, a dog park, tennis courts, pavilions, a Vita-Course, a yoga garden, water features and a promenade. The park design will incorporate recyclable materials, as well as solar-powered lighting fixtures. This project will treat stormwater runoff for the surrounding neighborhood watershed, by providing onsite water storage and pretreatment. The drainage system design incorporates green infrastructure and lake retention capacities that consider higher water tables associated with sea level rise predictions. Coastal Systems is providing conceptual site civil design, design development plans, construction documents, civil technical specifications, and an earthworks plan. Coastal Systems will apply for and obtain environmental permits from Miami-Dade County Department of Environmental Resource Management (DERM), Florida Department of Environmental Protection (FDEP), National Pollutant Discharge Elimination System (NPDES), Miami-Dade County Health Department, and City of Miami Beach Public Works. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Coastal Systems Coastal Systems Coastal Systems Coastal Systems International, Inc.International, Inc.International, Inc.International, Inc. (2) FIRM LOCATION Coral Gables, FloridaCoral Gables, FloridaCoral Gables, FloridaCoral Gables, Florida (3) ROLE Civil Engineering &Civil Engineering &Civil Engineering &Civil Engineering & Environmental PermittingEnvironmental PermittingEnvironmental PermittingEnvironmental Permitting b. (1) FIRM NAME Ardaman & AssociatesArdaman & AssociatesArdaman & AssociatesArdaman & Associates, Inc., Inc., Inc., Inc. (2) FIRM LOCATION HialeahHialeahHialeahHialeah, Florida, Florida, Florida, Florida (3) ROLE SubconsultantSubconsultantSubconsultantSubconsultant c. (1) FIRM NAME Gallagher Bassett Technical ServicesGallagher Bassett Technical ServicesGallagher Bassett Technical ServicesGallagher Bassett Technical Services, Inc., Inc., Inc., Inc. (2) FIRM LOCATION MiamiMiamiMiamiMiami, Florida, Florida, Florida, Florida (3) ROLE SubconsultantSubconsultantSubconsultantSubconsultant Page 68 STANDARD FORM 330 (8/2016) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20.EXAMPLE PROJECT KEY NUMBER 10 21. TITLE AND LOCATION (City and State) CityCityCityCity----wide Seawall wide Seawall wide Seawall wide Seawall AssessmentsAssessmentsAssessmentsAssessments, West Palm Beach, West Palm Beach, West Palm Beach, West Palm Beach, Florida, Florida, Florida, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) N/A 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of West Palm Beach 401 Clematis Street, 4th Floor West Palm Beach, FL 33402 b. POINT OF CONTACT NAME Ms. Suzanne Berglund, P.E. c. POINT OF CONTACT TELEPHONE NUMBER (561) 494-1075 sberglund@wpb.org 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Coastal Systems evaluated the condition of over 8 miles of existing bulkheads throughout the City of West Palm Beach. For each bulkhead, Coastal Systems mobilized a team led by an engineer and conducted an above and below water assessment of the existing bulkhead and structures to evaluate their condition. Coastal Systems prepared an engineering report, providing a structural assessment of the remaining useful life of the existing bulkhead as well as recommendations for repairs and/or replacement. The condition of the structure was rated in accordance with the American Society of Civil Engineers (ASCE) Underwater Investigation Manual. The report included an investigation plan and photographs to illustrate the observed conditions as well as a construction cost estimate for both repair and replacement options. The City later contracted Coastal Systems to provide additional evaluations of previously inspected seawalls and assess the need for repair or replacement of the most critically damaged sections. Coastal Systems evaluated the remaining useful life of the chosen sections and compared the estimated construction costs of replacing these sections as opposed to repairing periodically over their probable lifespan. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Coastal Systems International, Inc.Coastal Systems International, Inc.Coastal Systems International, Inc.Coastal Systems International, Inc. (2) FIRM LOCATION Coral Gables, FloridaCoral Gables, FloridaCoral Gables, FloridaCoral Gables, Florida (3) ROLE Marine Structural Marine Structural Marine Structural Marine Structural EngineeringEngineeringEngineeringEngineering Marine Structural Engineering Structural Investigations RELEVANT SERVICES: RELEVANT SERVICES: RELEVANT SERVICES: RELEVANT SERVICES: CLIENT:CLIENT:CLIENT:CLIENT: City of West Palm Beach PROJECT PROJECT PROJECT PROJECT SCHEDULE:SCHEDULE:SCHEDULE:SCHEDULE: 2018 – 2018 CONSTRUCTION COST:CONSTRUCTION COST:CONSTRUCTION COST:CONSTRUCTION COST: $23M (estimated) Page 69 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER: 11 21. TITLE AND LOCATION (City and State) 500 Alton Road, Miami Beach, Miami-Dade County, Florida 33139 Phase II Environmental Site Assessments. 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) October 2019-Present N/A 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER TCH 500 Alton, LLC 2665 S. Bayshore Drive, Suite 1020 Coconut Grove, Florida 33133 b. POINT OF CONTACT NAME Ms. Ellen Buckley c. POINT OF CONTACT TELEPHONE NUMBER Phone (305) 416-4556 Email: ebuckley@terragroup.com 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Gallagher Bassett Technical Services Division (GBTS), formerly EE&G Environmental Services, LLC, was engaged to perform and prepare a Phase II Environmental Site Assessment (ESA), and following submission of drainage and design plans to the Miami-Dade County DERM, subsequent Site Assessment Report Addendums (SARAs). GBTS conducted an Interim Source Removal (ISR) of petroleum-affected soils. GBTS prepared the pre-construction environmental documents in preparation for construction of a City Park, which included A Soil Management Plan (SMP), Dust Control Plan (DCP), and Health & Safety Plan (HASP). GBTS also prepared a Conceptual Engineering Control Plan (ECP) to provide the design for a safe cap across the further park to prevent direct exposure to underlying arsenic-affected soils. Cost: $60,000 Size: 2 Blocks Project Director: Craig C. Clevenger, PG 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME GBTS (2) FIRM LOCATION (City and State) Miami-Dade County, Miami Lakes, FL (3) ROLE Prime Page 70 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER: 12 21. TITLE AND LOCATION (City and State) South Florida Affordable Housing Developer Portfolio, Pinnacle Housing Group, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2004 - Present N/A 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER Pinnacle Housing Group, LLC 9400 S. Dadeland Blvd, Suite 100 Miami Florida 33156 b. POINT OF CONTACT NAME Mr. Mitch Friedman c. POINT OF CONTACT TELEPHONE NUMBER Phone: 305-854-7100 Email: mitch@pinnaclehousing.com 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) GBTS provide environmental consulting services related to their acquisition, financing, and redevelopment projects in Florida. The bulk of the work was completed in Broward and Miami-Dade Counties, but also extends northward into Palm Beach and Martin Counties. EE&G performs a wide-range of environmental consulting services, including environmental due diligence services (Phase I ESAs, Phase II ESA, Asbestos Containing Building Material Surveys, Lead-Based Paint Assessments, Indoor Air Quality and Mold Assessments), regulatory-driven environmental services (Site Assessment Reports, Remedial Action Plans, Source Removal, Tank Closure Assessments, Groundwater Monitoring Only Plans, and Engineering Control Verification), Brownfields Consulting Services, and mold-abatement services. For the past 3 years, EE&G has completed the following volume of services for the Client. Phase I ESAs and Updates for approximately 28 sites / Phase II ESAs / SARs for approximately 18 sites. Remedial Services (Source Removal and Tank Closures) for two sites. ACBM, LBP, IAQ, and Mold Assessments for approximately 12 sites. Abatement of Mold-Impacted Building Materials at on site. Cost: $137,317.00 Size: Approximately 30+ projects since 2004 Project Director: Craig C. Clevenger, PG 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME GBTS (2) FIRM LOCATION (City and State) Miami-Dade County, Miami Lakes, Florida (3) ROLE Prime Page 71 STANDARD FORM 330 (REV. 8/2016) PAGE 4 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED Sunny Isles Gateway Park Sunny Isles, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2012-2013 2017 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT EMAIL ADDRESS City of Sunny Isles, 18070 Collins Ave, Sunny Isles Beach, FL 33160 Joseph Milton josephmilton@j-milton.com 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (include scope, size, and cost) Sunny Isles Beach Park/Garage is a park designed as a new community green space, ideally located at one of the major gateways to the City. Established as a joint venture between developer (who has significant condominium holdings adjacent to the park) and the City, the park provides diverse recreational activities and allows for programming large community events like concerts, games, etc. A small courtyard is located adjacent to a planned cafe, along with a waterfall, water play area and playground. Location: Sunny Isles Beach, FL Service: Master Plan thru Construction Administration Principal Firm: Axioma3 Architects Date: Ongoing Project Cost: $2 Million Principal in-charge: Barry Miller 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE Savino & Miller Design Studio, PA 12345 NE 6th Avenue, North Miami, FL 33161 Local Landscape Architect b.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE c.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE SITE PLAN FINAL CONCEPT 01-19-2012 Page 72 STANDARD FORM 330 (REV. 8/2016) PAGE 5 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED Sunny Isles City Hall Sunny Isles, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2002-2004 2004 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT EMAIL ADDRESS City of Sunny Isles, 18070 Collins Ave, Sunny Isles Beach, FL 33160 Lawrence Kline (Perkins & Will)lawrence.kline@perkinswill.com, (305) 569-1333 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (include scope, size, and cost) In close collaboration with the City and design team, a Master Plan was created to link street, building, and open space. Our open space concept integrates City Hall and adjacent restaurant into a cohesive urban setting. Users are engaged through sensitive placement of indoor- outdoor elements/activities. SMDS was responsible for all open space improvements, including Fountain/Plaza, site lighting, planting and paving. Native/xeriscape planting and local paving materials were selected for their sustainability and ease of maintenance. Location: Sunny Isles Beach, Florida Client: Spillis Candela / City of Sunny Isles Beach Project Cost: $300,000 Service: Master Planning, Schematic Design – Construction Administration Architect: Spillis Candela & Partners (Currently Aecom) Date Construction: 2004 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE Savino & Miller Design Studio, PA 12345 NE 6th Avenue, North Miami, FL 33161 Landscape Architect b.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE c.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE Page 73 STANDARD FORM 330 (REV. 8/2016) PAGE 7 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 2 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED Miami Baywalk & Riverwalk Design Guidelines Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2018-2019 N/A 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Miami Downtown Development Authority, 200 S Biscayne Blvd #2929, Miami, FL 33131 Neal Schafers (305) 579-6675 schafers@miamidda.com 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (include scope, size, and cost) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE Savino & Miller Design Studio, PA 12345 NE 6th Avenue, North Miami, FL 33161 Landscape Architect b.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE c.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE d.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE The Miami Baywalk Design Guidelines propose lighting, paving, planting, furnishing and shoreline improvements along Biscayne Bay and the Miami River within the Miami DDA boundaries. Focusing on Miami’s resiliency, history, culture, identity and ecology, the guidelines dictate design standards to improve existing conditions on the Baywalk and Riverwalk, providing flexibility and cohesion while staying true to the character of the site and the needs and desires of the community. Client: Miami Downtown Development Authority Service: Master Plan, Design Guidelines Principal Firm: Savino & Miller Design Studio Date: 2019 Page 74 G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 26. NAMES OF KEY PERSONNEL (From Section E, Block 12) 27. ROLE IN THIS CONTRACT (From Section E, Block 13) 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in Example Projects Key section below before completing table. Place under project key number for participation in same or similar role.) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 R. Harvey Sasso Principal-in-Charge X X X X X Andres Perez Director X X X X X X X X X Megan Reising Environmental/Permitting Senior Project Manager Taylor Scheuermann Environmental/Permitting Project Manager X X X X X X Orestes Betancourt Senior Civil Engineer X X X X X X X Mahsa Kamali Structural Engineer X X X X Demar Woodson Project Manager X X Carl Reyes Civil CAD Designer X X X X X X X Emily Prosser Junior Project Manager X X X X X Aaron Boehning Hydrographic Surveyor X X X X X X Sandra Rahman GIS Analyst X X X X X X X Craig C. Clevenger Project Director X X X X X Adam B. Brosius Senior Technician X X X X Barry Miller Principal-in-Charge X X X X X Adriana Savino- Miller Principal-Master Planning X X X X X Rene I. Basulto Principal-in-Charge X X X X Charles T. Yost Electrical Engineer X X X X Evelio N. Horta Geotechnical Engineer X X X Joaquin E. Vargas Transportation/Traffic Engineer X Pedro Martinez Land Surveyor X 29. EXAMPLE PROJECTS KEY No. TITLE OF EXAMPLE PROJECT (FROM SECTION F) No. No. TITLE OF EXAMPLE PROJECT (FROM SECTION F) 1 Sunny Isles Beach Management and Shoreline Stabilization Study, Miami-Dade County, Florida 6 Miracle Mile and Giralda Avenue Streetscape, Coral Gables, Florida 2 Coastal Inundation and Economic Vulnerability Study, Bal Harbour, Florida 7 Beachwalk II, Miami Beach, Florida 3 Haulover Marine Center, North Miami Beach, Florida 8 Maurice Gibb Memorial Park, Miami Beach, Florida 4 Maurice A. Ferré Park, Miami, Florida 9 Bayshore Park, Miami Beach, Florida 5 Rickenbacker Causeway Recreational Center, Miami-Dade County, Florida 10 City-wide Seawall Assessments, West Palm Beach, Florida Page 75 11 500 Alton Road, Miami Beach, Florida 14 Sunny Isles City Hall, Sunny Isles, Florida 12 South Florida Affordable Housing Developer Portfolio, Pinnacle Housing Group, Florida 15 Miami Baywalk & Riverwalk Design Guidelines, Miami, Florida 13 Sunny Isles Gateway Park, Sunny Isles, Florida Page 76 ARCHITECT – ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (If any) 20-07-01 PART II – GENERAL CONDITIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (OR BRANCH OFFICE) NAME Coastal Systems International, Inc. 3. YEAR ESTABLISHED 1995 4. DUNS NUMBER 835411604 2b. STREET 464 South Dixie Highway 5. OWNERSHIP a. TYPE Corporation 2c. CITY Coral Gables 2d. STATE Florida 2e. ZIP CODE 33146 b. SMALL BUSINESS STATUS 6a. POINT OF CONTACT NAME AND TITLE Andres Perez, P.E., Director 7. NAME OF FIRM (If block 2a is a branch office) 6b. TELEPHONE NUMBER (305) 661-3655 6c. E-MAIL ADDRESS aperez@coastalsystemsint.com 8a. FORMER FIRM NAME(S) (If any) 8b. YR. ESTABLISHED 8c. DUNS NUMBER Coastal Technology Corporation 1984 835411604 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM’S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function Code b. Discipline c. No. of Employees a. Profile Code b. Experience c. Revenue Index Number (see below) (1) FIRM (2) BRANCH 2 Administrative 4 A02 Aerial Photography 1 7 Biologist 1 C07 Coastal Engineering 3 8 CADD 3 C15 Construction Management 3 12 Civil Engineer 3 D08 Dredging Studies and Design 2 24 Environmental Scientist 1 E09 Environmental Impact Studies/Assessments 2 29 GIS Technician 1 E10 Environmental & Natural Resources Mapping 2 33/38 Land/Hydrographic Surveyor 2 G04 GIS 1 48 Project Manager 3 H01 Harbors, jetties, etc 3 57 Structural Engineer 1 H13 Hydro Survey 1 Coastal Engineer 1 P06 Planning (Site, Installation & Project) 3 R06 Rehabilitations (Buildings/Structures) 1 R11 Rivers, Canals, Waterways 1 S04 Sewage Collection, Treatment & Disposal 2 S09 Structural Design 1 S13 Stormwater Handling 3 T04 Topographic Survey 1 W03 Water Supply Treatment & & Distribution 1 R04 Recreational Facilities (Parks, Marinas) 3 Total 20 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (insert revenue index number shown at right) PROFESSIONAL SERVICES REVENUE INDEX NUMBER 1. Less than $100,000 6. $2 million to less than $5 million 2. $100,000 to less than $250,000 7. $5 million to less than $10 million a. Federal Work 0 3. $250,000 to less than $500,000 8. $10 million to less than $25 million b. Non-Federal Work 6 4. $500,000 to less than $1 million 9. $25 million to less than $50 million c. Total Work 6 5. $1 million to less than $2 million 10. $50 million or greater 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. a. SIGNATURE b. DATE August 11, 2020 c. NAME AND TITLE Andres Perez, P.E., Director Page 77 PART II - GENERAL QUALIFICATIONS a. SIGNATURE ARCHITECT-ENGINEER QUALIFICATIONS 2a. FIRM (OR BRANCH OFFICE) NAME 2b. STREET 2c. CITY 2d. STATE 2e. ZIP CODE 3. YEAR ESTABLISHED 4. DUNS NUMBER 5. OWNERSHIP b. Discipline c. No. of Employees 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS b. Experience c. Revenue Index Number 1. SOLICITATION NUMBER 8a. FORMER FIRM NAME(S)8b. YR. ESTABLISHED 9. EMPLOYEES BY DISCIPLINE Total (1) FIRM (2) BRANCH 1. Less than $100,000 2. $100,00 to less than $250,000 3. $250,000 to less than $500,000 4. $500,000 to less than $1 million 5. $1 million to less than $2 million 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS 7. NAME OF FIRM 6a. POINT OF CONTACT NAME AND TITLE 6c. E-MAIL ADDRESS 8c. DUNS NUMBER a. Federal Work b. Non-Federal Work c. Total Work 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. b. DATE c. NAME AND TITLE a. Function Code a. Profile Code 6b. TELEPHONE NUMBER a. TYPE b. SMALL BUSINESS STATUS PROFESSIONAL SERVICES REVENUE INDEX NUMBER 6. $2 million to less than $5 million 7. $5 million to less than $10 million 8. $10 million to less than $25 million 9. $25 million to less than $50 million 10. $50 million or greater Other Employees AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV.)PAGE 6 Page 78 ARCHITECT-ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (If Any) PART II – GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (OR BRANCH OFFICE) NAME Gallagher Bassett Services, Inc. 3. YEAR ESTABLISHED\ 1985 4. DUNS NUMBER 14-752-5224 2b. STREET 5751 Miami Lakes Drive 5. OWNERSHIP a. TYPE Corporation 2c. CITY Miami Lakes 2d. STATE FL 2e. ZIP CODE 33014 6a. POINT OF CONTACT NAME AND TITLE Carolyn Bailey, Vice President b. SMALL BUSINESS STATUS N/A 6b. TELEPHONE NUMBER 305-374-8300 6c. E-MAIL ADDRESS CBailey@eeandg.com 7. NAME OF FIRM (If Block 2a is a branch office) N/A 8a. FORMER FIRM NAME(S) (If any): Evans Environmental & Geological Science & management, LLC (Evans) 8b. YEAR ESTABLISHED 1986 8c. DUNS NUMBER 189356512 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM’S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function Code b. Discipline c. No. of Employees a. Profile Code b. Experience c. Revenue Index Number (see below) (1) Firm (2) Branch 02 Administrative 8 E09 Environmental Assessments 5 08 CADD Technician 1 E12 Environmental Remediation 5 23 Professional Engineer 1 E13 Environmental Testing & Analysis 6 24 Environmental Scientist 1 H02 Hazardous Materials Handling/Storage 1 30 Professional Geologist 1 H03 Hazardous, Toxic, Radioactive Waste Remediation 1 36 Industrial Hygienist 1 48 Project Manager 7 T02 Testing & Inspection Services 5 50 Risk Assessor 1 51 Safety/Occupation Health Engineer 1 Asbestos Containing Material Worker 3 Asbestos Containing Material Lab Tech 1 Asbestos Containing Material Inspector 6 Asbestos Containing Material Supervisor 7 General Contractor 1 Hazardous Assessments/Remediation 3 TOTAL EMPLOYEES (1) 58 (Continued on Next Page) 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) PROFESSIONAL SERVICES REVENUE INDEX NUMBER 1. Less than $100,000 6. $2 million to less than $5 million 2. $100,000 to less than $250,000 7. $5 million to less than $10 million 3. $250,000 to less than $500,000 8. 10 million to less than $25 million 4. $500,000 to less than $1 million 9. $25 million to less than $50 million 5. $1 million to less than $2 million 10. $50 million or greater a. Federal Work 1 b. Non-Federal Work 5 c. Total Work 7 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. a. SIGNATURE b. DATE 06/04/20 c. NAME AND TITLE Carolyn Bailey, Florida Regional Manager AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) PAGE 1 Page 79 ARCHITECT-ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (If Any) PART II – GENERAL QUALIFICATIONS (CONTINUED) (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (OR BRANCH OFFICE) NAME Gallagher Bassett Services, Inc. 3. YEAR ESTABLISHED 1985 4. DUNS NUMBER 14-752-5224 2b. STREET 5751 Miami Lakes Drive 5. OWNERSHIP a. TYPE Limited Liability Company (LLC) 2c. CITY Miami Lakes 2d. STATE FL 2e. ZIP CODE 33014 6a. POINT OF CONTACT NAME AND TITLE Carolyn Bailey, Vice President b. SMALL BUSINESS STATUS N/A 6b. TELEPHONE NUMBER 305-374-8300 6c. E-MAIL ADDRESS CBailey@eeandg.com 7. NAME OF FIRM (If Block 2a is a branch office) N/A 8a. FORMER FIRM NAME(S) (If any): Evans Environmental & Geological Science & management, LLC (Evans) 8b. YEAR ESTABLISHED 1986 8c. DUNS NUMBER 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM’S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function Code b. Discipline c. No. of Employees a. Profile Code b. Experience c. Revenue Index Number (see below) (1) Firm (2) Branch Indoor Air Quality Professional 3 License Asbestos Consultant 1 Lead Based Paint Assessment 2 Lead Based Paint Renovation 1 Mold Assessment 3 Mold Remediation 3 Radon Specialist 1 Radon Tech 1 (1) Note: Although EE&G has 53 staff members, several staff members have multiple certifications and can therefore, work across disciplines. This saves the client money and provides consistency on projects involving multiple disciplines. TOTAL EMPLOYEES 58 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) PROFESSIONAL SERVICES REVENUE INDEX NUMBER 1. Less than $100,000 6. $2 million to less than $5 million 2. $100,000 to less than $250,000 7. $5 million to less than $10 million 3. $250,000 to less than $500,000 8. 10 million to less than $25 million 4. $500,000 to less than $1 million 9. $25 million to less than $50 million 5. $1 million to less than $2 million 10. $50 million or greater a. Federal Work 1 b. Non-Federal Work 5 c. Total Work 7 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. a. SIGNATURE b. DATE 6/04/20 c. NAME AND TITLE Carolyn Bailey, Florida Regional Manager AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (6/2004) PAGE 2 Page 80 STANDARD FORM 330 (REV. 8/2016) PAGE 3 ARCHITECT - ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (If any) RFQ-20-07-01-0-2020 PART II – GENERAL QUALIFICATONS(If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (OR BRANCH OFFICE) NAME 3. YEAR ESTABLISHED 4. DUNS NUMBER Savino & Miller Design Studio, PA 1993 2b. STREET 5. OWNERSHIP 12345 NE 6th Avenue, Suite A a. TYPE S. Corporation2c. CITY 2d. STATE 2e. ZIP CODE North Miami FL 33161 b. SMALL BUSINESS STATUS Hispanic-Woman Owned6a. POINT OF CONTACT NAME AND TITLE Adriana Savino-Miller, President 7. NAME OF FIRM (If block 2a is a branch office) 6b. TELEPHONE NUMBER 6c. E-MAIL ADDRESS (305) 895-9082 adriana@savinomiller.com 8a. FORMER FIRM NAME(S) (If any)8b. YEAR ESTABLISHED 8c. DUNS NUMBER 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM’S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function Code b. Discipline c. No. of Employees a. Profile Code b. Experience c. Revenue IndexNumber(see below)(1) FIRM (2) BRANCH 06-47 Architect/Urban Designer 1 L03 Landscape Architecture 3 39-47 Landscape Architect 2 P06 Planning 1 39 Landscape Arch. Designers 3 002 Urban Renewals 1 2 Clerical 2 L06 Lighting 1 P13 Public Facilities 2 R04 Recreational Facilities 3 S11 Sustainable Design 3 Total 44 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) PROFESSIONAL SERVICES REVENUE INDEX NUMBER 1. Less than $100,000 6. $2 million to less than $5 million 2. $100,000 to less than $250,000 7. $5 million to less than $10 million a. Federal Work 0 3. $250,000 to less than $500,000 8. $10 million to less than $25 million b. Non-Federal Work 4 4. $500,000 to less than $1 million 9. $25 million to less than $50 million c. Total Work 4 5. $1 million to less than $2 million 10. $50 million or greater 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. a. SIGNATURE b. DATE 07/29/20 c. NAME AND TITLE Adriana Savino-Miller, President Page 81 Page 82 ARCHITECT – ENGINEER QUALIFICATIONS 1.SOLICITATION NUMBER (If any) PART II – GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (OR BRANCH OFFICE) NAME Traf Tech Engineering, Inc. (Tamarac, Florida) 3. YEAR ESTABLISHED 2005 4. DUNS NUMBER 60-854-4289 2b. STREET 8400 N. University Drive, Suite 309 5. OWNERSHIP a. TYPE 2c. CITY Tamarac 2d. STATE FL 2e. ZIP CODE 33321 Corporation b. SMALL BUSINESS STATUS 6a. POINT OF CONTACT NAME AND TITLE Joaquin E. Vargas DBE and SBE 7. NAME OF FIRM (If block 2a is a branch office) 6a. TELEPHONE NUMBER (954) 643-1671 6c. E-MAIL ADDRESS joaquin@traftech.biz 8a. FORMER FIRM NAME(S)(If any)8b. YR. ESTABLISHED 8c. DUNS NUMBER 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM’S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function Code b. Discipline c. No. of Employees a. Profile Code b. Experience c. Revenue Index Number (see below) (1) FIRM (2) BRANCH 02 Administrative 2 T03 Traffic and Transportation 3 60 Transportation Engineer 1 Parking Studies 1 Other Employees Total 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) PROFESSIONAL SERVICES REVENUE INDEX NUMBER 1. Less than $100,000 6. $2 million to less than $5 million 2. $100,000 to less than $250,000 7. $5 million to less than $10 million 3. $250,000 to less than $500,000 8. $10 million to less than $25 million 4. $500,000 to less than $1 million 9. $25 million to less than $50 million 5. $1 million to less than $2 million 10. $50 million or greater a. Federal Work b. Non-Federal Work 3 c. Total Work 3 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. a. SIGNATURE b. DATE 8-10-2020 c. NAME AND TITLE Joaquin E. Vargas - President AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FROM 330 (6/2004)PAGE 7 Sunny Isles RFQ Page 83 August 18, 2020 Professional Consulting Services City of Sunny Isles Beach RFQ No. 20-07-01 Page 84 Coastal Systems InternationalCoastal Systems InternationalCoastal Systems InternationalCoastal Systems International August 18, 2020 Professional Consulting Services City of Sunny Isles Beach RFQ No. 20-07-01 Page 85 Ardaman and AssociatesArdaman and AssociatesArdaman and AssociatesArdaman and Associates Basulto and AssociatesBasulto and AssociatesBasulto and AssociatesBasulto and Associates August 18, 2020 Professional Consulting Services City of Sunny Isles Beach RFQ No. 20-07-01 Page 86 Gallagher Bassett Gallagher Bassett Gallagher Bassett Gallagher Bassett Technical Technical Technical Technical ServicesServicesServicesServices Savino and Miller Design StudioSavino and Miller Design StudioSavino and Miller Design StudioSavino and Miller Design Studio August 18, 2020 Professional Consulting Services City of Sunny Isles Beach RFQ No. 20-07-01 Page 87 TrafTrafTrafTraf Tech EngineeringTech EngineeringTech EngineeringTech Engineering 4444 Firm References and Similar Work CompletedFirm References and Similar Work CompletedFirm References and Similar Work CompletedFirm References and Similar Work Completed August 18, 2020 Professional Consulting Services City of Sunny Isles Beach RFQ No. 20-07-01 Page 88 Firm References Firm References Firm References Firm References and Similar Work Completedand Similar Work Completedand Similar Work Completedand Similar Work Completed Coastal Inundation and Economic Vulnerability Study Mr. John Oldenburg Bal Harbour Village Tel: (305) 993-7436 Email: joldenburg@balharbourfl.gov Maurice A. Ferre Park Mr. John De Pazos City of Miami Tel: (305) 416-1094 Email: jdepazos@miamidade.gov Haulover Marine Center Ms. Lydia Salas Miami-Dade County Parks Tel: (305) 755-5456 Email: lydias@miamidade.gov Project NameProject NameProject NameProject Name ScopeScopeScopeScope Client NameClient NameClient NameClient Name Contract Contract Contract Contract AmountAmountAmountAmount HAULOVER MARINA UTILITIES CIVIL ENGINEERING MIAMI DADE COUNTY $ 54,117.00 HILLSBORO INLET SOUTH JETTY F SURVEY, MARINE ENGINEERING, ENVIRONMENTAL PERMITTING HILLSBORO INLET DISTRICT $ 178,700.00 HID CORAL TRANSPLANTATION & M BIOLOGICAL SURVEY HILLSBORO INLET DISTRICT $ 66,500.00 HILLSBORO INLET COMPLIANCE ENVIRONMENTAL PERMITTING, COASTAL ENGINEERING HILLSBORO INLET DISTRICT $ 130,900.00 KEY BISC BCH NOURISHMENT SEAG SURVEY, COASTAL ENGINEERING, ENVIRONMENTAL PERMITTING VILLAGE OF KEY BISCAYNE $ 735,399.00 KEY BISCAYNE BCH MAINTENANCE SURVEY, COASTAL ENGINEERING, ENVIRONMENTAL PERMITTING VILLAGE OF KEY BISCAYNE $ 659,365.00 KEY BISCAYNE MASHTA FLAT EXCL ENVIRONMENTAL PERMITTING VILLAGE OF KEY BISCAYNE $ 24,900.00 HILLSBORO BEACH RENOURISHMENT SURVEY, COASTAL ENGINEERING, ENVIRONMENTAL PERMITTING TOWN OF HILLSBORO BEACH $2,030,207.00 REGIONAL BCH SEDIMENT MGMT & COASTAL ENGINEERING PALM BEACH COUNTY $ 94,891.00 BAL HARBOUR BEACH MANAGEMENT COASTAL ENGINEERING, RESILIENCY CONSULTING BAL HARBOUR VILLAGE $ 395,404.00 POST-STORM DUNE RESTORATION SURVEY, ENVIRONMENTAL PERMITTING BAL HARBOUR VILLAGE $ 13,200.00 BAL HARBOUR SHORELINE IMPROVE ENVIRONMENTAL PERMITTING BAL HARBOUR VILLAGE $ 8,500.00 BAL HARBOUR BEACH UAV SURVEYI SURVEY BAL HARBOUR VILLAGE $ 16,200.00 VILLAGE OF BAL HARB. REGIONAL ENVIRONMENTAL CONSULTING BAL HARBOUR VILLAGE $ 19,700.00 VILLAGE OF BAL HARBOUR COASTA COASTAL ENGINEERING, ENVIRONMENTAL CONSULTING BAL HARBOUR VILLAGE $ 267,900.00 VILLAGE OF BAL HARBOUR TAC RE COASTAL ENGINEERING, ENVIRONMENTAL CONSULTING BAL HARBOUR VILLAGE $ 18,400.00 VILLAGE OF BAL HARBOUR FEMA F ENVIRONMENTAL CONSULTING BAL HARBOUR VILLAGE $ 19,950.00 BAKERS HAULOVER INLET MNGMT P COASTAL ENGINEERING, ENVIRONMENTAL PERMITTING BAL HARBOUR VILLAGE $ 9,100.00 COASTAL INUNDATION & ECONOMIC INUNDATION MODELING, ECONOMIC ANALYSIS BAL HARBOUR VILLAGE $ 75,000.00 PERMIT MOD FOR THE SEVILLE BO ENVIRONMENTAL PERMITTING CITY OF MIAMI BEACH $ 18,700.00 Coastal Systems International | Public Project List 2015-2020Coastal Systems International | Public Project List 2015-2020Coastal Systems International | Public Project List 2015-2020Coastal Systems International | Public Project List 2015-2020 August 18, 2020 Professional Consulting Services City of Sunny Isles Beach RFQ No. 20-07-01 Page 89 MYERS PARK SURVEY, MARINE ENGINEERING, ENVIRONMENTAL PERMITTING CITY OF MIAMI $ 32,077.00 MYERS PARK PHASE 2 MARINE ENGINEERING, ENVIRONMENTAL PERMITTING CITY OF MIAMI $ 149,483.00 RICKENBACKER CAUSEWAY RECREAT SURVEY, MARINE/COASTAL/CIVIL ENGINEERING, ENVIRONMENTAL MIAMI DADE COUNTY $ 402,272.00 RICKENBACKER CAUSEWAY HOBIE I SURVEY, MARINE/COASTAL/CIVIL ENGINEERING, ENVIRONMENTAL MIAMI DADE COUNTY $ 314,717.00 REPAIR - BREAKWATERS AT FT. Z SURVEY, COASTAL ENGINEERING, ENVIRONMENTAL PERMITTING FLORIDA DEPT.OF ENVIRONMENTAL PROTECTION $ 15,792.00 BREAKWATER ALTERNATIVES FT. Z SURVEY, COASTAL ENGINEERING, ENVIRONMENTAL PERMITTING FLORIDA DEPT.OF ENVIRONMENTAL PROTECTION $ 67,991.00 MIAMI BEACH BAYWALK / Departm CIVIL ENGINEERING CITY OF MIAMI BEACH-DERM $ 74,965.00 DANIA BEACH BOAT CLUB (FKA BR ENVIRONMENTAL CONSULTING, CIVIL ENGINEERING DANIA BEACH MARINA, CORPS $ 14,400.00 MARINE STADIUM MARINA BULKHEA SURVEY, MARINE ENGINEERING, ENVIRONMENTAL PERMITTING CITY OF MIAMI $ 93,239.00 MANATEE BEND PARK SHORELINE SURVEY, MARINE ENGINEERING, ENVIRONMENTAL PERMITTING CITY OF MIAMI $ 81,746.00 MARINE STADIUM SUBSTRUCTURE G SURVEY, MARINE ENGINEERING, ENVIRONMENTAL PERMITTING CITY OF MIAMI $ 46,018.00 DINNER KEY MARINA SEWAGE PUMP CIVIL ENGINEERING CITY OF MIAMI $ 41,168.00 MANATEE BEND CONSTRUCTION ADM CONSTRUCTION ADMINISTRATION CITY OF MIAMI $ 11,317.00 PBA PARK/FERN ISLE PARK SHORE SURVEY, MARINE ENGINEERING, ENVIRONMENTAL PERMITTING CITY OF MIAMI $ 61,980.00 MANGROVE TRIMMING-BAYWOOD PAR ENVIRONMENTAL PERMITTING CITY OF MIAMI $ 15,716.00 MANGROVE TRIMMING - KENNEDY P ENVIRONMENTAL PERMITTING CITY OF MIAMI $ 34,011.00 MANGROVE TRIMMING-KENNETH M M ENVIRONMENTAL PERMITTING CITY OF MIAMI $ 12,143.00 MANGROVE TRIMMING-LEGION PARK ENVIRONMENTAL PERMITTING CITY OF MIAMI $ 17,056.00 MANGROVE TRIMMING-PEACOCK PAR ENVIRONMENTAL PERMITTING CITY OF MIAMI $ 19,497.00 MIAMARINA PIER 5 IMPROVEMENTS SURVEY, MARINE ENGINEERING, ENVIRONMENTAL PERMITTING CITY OF MIAMI $ 141,430.00 ANTONIO MACEO PARK SURVEY, MARINE ENGINEERING, ENVIRONMENTAL PERMITTING CITY OF MIAMI $ 61,054.00 FIRST PRESBYTERIAN CHURCH SURVEY, MARINE ENGINEERING, ENVIRONMENTAL PERMITTING CITY OF MIAMI $ 117,405.00 MIAMI RIVER DOCK & SEAWALL SURVEY, MARINE ENGINEERING, ENVIRONMENTAL PERMITTING CITY OF MIAMI $ 120,072.00 NE 22ND STREET END SURVEY, MARINE ENGINEERING, ENVIRONMENTAL PERMITTING CITY OF MIAMI $ 58,335.00 PEACOCK PARK SURVEY, MARINE ENGINEERING, ENVIRONMENTAL PERMITTING CITY OF MIAMI $ 35,486.00 NE 25TH ST END SURVEY, MARINE ENGINEERING, ENVIRONMENTAL PERMITTING CITY OF MIAMI $ 110,476.00 KENNEDY PARK BOARDWALK REPAIR SURVEY, MARINE ENGINEERING, ENVIRONMENTAL PERMITTING CITY OF MIAMI $ 37,486.00 August 18, 2020 Professional Consulting Services City of Sunny Isles Beach RFQ No. 20-07-01 Page 90 RICKENBACKER VIRGINIA & HOBIE SURVEY, MARINE/COASTAL/CIVIL ENGINEERING, ENVIRONMENTAL MIAMI-DADE COUNTY PARKS $ 58,050.00 WILLIAM POWELL BRIDGE NE SHOR SURVEY, MARINE/COASTAL/CIVIL ENGINEERING, ENVIRONMENTAL MIAMI-DADE COUNTY PARKS $ 43,585.00 HAULOVER SEA LEVEL RISE STUDY INUNDATION MODELING, RESILIENT DESIGN MIAMI-DADE COUNTY PARKS $ 33,935.00 MUSEUM PARK PROMENADE CIVIL ENGINEERING, ENVIRONMENTAL PERMITTING CITY OF MIAMI $ 382,869.00 MUSEUM PARK PROMENADE-PHASE I CIVIL ENGINEERING, ENVIRONMENTAL PERMITTING CITY OF MIAMI $ 109,722.00 MUSEUM PARK PLAYGROUND CIVIL ENGINEERING, ENVIRONMENTAL PERMITTING CITY OF MIAMI $ 35,205.00 HOLLYWOOD BEACH MOBI MAT ENVIRONMENTAL PERMITTING HOLLYWOOD BEACH COMMUNITY REDEVELOPMENT $ 40,300.00 BEACHWALK II SURVEY, CIVIL/COASTAL ENGINEERING, ENVIRONMENTAL CITY OF MIAMI BEACH-DERM $ 527,538.00 NBV BAYWALK - FIELDWORK SURVEY CITY OF NORTH BAY VILLAGE $ 32,400.00 NBV BAYWALK - PERMITTING ENVIRONMENTAL PERMITTING CITY OF NORTH BAY VILLAGE $ 143,600.00 CITY OF SUNNY ISLES BCH-DEP F COASTAL ENGINEERING, ENVIRONMENTAL PERMITTING CITY OF SUNNY ISLES BEACH $ 42,300.00 CITY OF SUNNY ISLES BCH - BRE SURVEY CITY OF SUNNY ISLES BEACH $ 7,500.00 TOWN OF PALM BEACH REACH 8 EI ENVIRONMENTAL CONSULTING TOWN OF PALM BEACH $ 47,590.00 TPB GENERAL CONSULTING SERVIC COASTAL/ENVIRONMENTAL CONSULTING TOWN OF PALM BEACH $ 10,000.00 PEER REVIEW OF BREAKERS MIDTO COASTAL ENGINEERING TOWN OF PALM BEACH $ 11,840.00 HALLANDALE BEACH - BEACH MANA SURVEY, COASTAL ENGINEERING, ENVIRONMENTAL PERMITTING CITY OF HALLANDALE $ 323,800.00 HOLLYWOOD TRUCK HAUL SURVEY, COASTAL ENGINEERING, ENVIRONMENTAL PERMITTING CITY OF HOLLYWOOD $ 858,393.00 TRUCK HAUL BCH POST HURRICANE SURVEY, COASTAL ENGINEERING, ENVIRONMENTAL PERMITTING CITY OF HOLLYWOOD $ 21,600.00 KEATING PARK SEAWALL REPAIR P ENVIRONMENTAL PERMITTING CITY OF HOLLYWOOD $ 2,914.00 2017 NOURISHMENT PROJECT SURVEY, COASTAL ENGINEERING, ENVIRONMENTAL PERMITTING CITY OF HOLLYWOOD $ 35,800.00 DEERFIELD BEACH CONSULTING SE COASTAL CONSULTING CITY OF DEERFIELD BEACH $ 27,700.00 PORTMIAMI CORAL TRANSPLANT MO BIOLOGICAL SURVEY PORTMIAMI $ 79,103.00 NON-ACROPORA RELOCATED CORAL BIOLOGICAL SURVEY PORTMIAMI $ 146,308.00 ARTIFICIAL REEF MONITORING BIOLOGICAL SURVEY PORTMIAMI $ 547,263.00 DEEP DREDGE-MONITORING RESOUR BIOLOGICAL SURVEY PORTMIAMI $ 8,350.00 SEAGRASS MITIGATION MONITORIN BIOLOGICAL SURVEY PORTMIAMI $ 394,454.00 PORT MIAMI IMPACT DELINEATION BIOLOGICAL SURVEY PORTMIAMI $ 2,293.00 PORTMIAMI OFFSHORE IMPACT ASS BIOLOGICAL SURVEY PORTMIAMI $ 269,644.00 CURRIE PARK STAGING DOCK & MA SURVEY, MARINE ENGINEERING, ENVIRONMENTAL PERMITTING CITY OF WEST PALM BEACH $ 172,215.00 August 18, 2020 Professional Consulting Services City of Sunny Isles Beach RFQ No. 20-07-01 Page 91 EL CID PIER REPLACEMENT SURVEY, MARINE ENGINEERING, ENVIRONMENTAL PERMITTING CITY OF WEST PALM BEACH $ 38,600.00 3336 N FLAGLER DRIVE SURVEY, MARINE ENGINEERING CITY OF WEST PALM BEACH $ 5,580.00 CITY OF WEST PALM BEACH SEAWA SURVEY, MARINE ENGINEERING CITY OF WEST PALM BEACH $ 253,505.00 POMPANO BEACH HOUSE ENVIRONMENTAL PERMITTING RENE GONZALEZ ARCHITECT $ 10,400.00 MIRACLE MILE/GIRALDA AVE STRE CIVIL ENGINEERING CITY OF CORAL GABLES $ 332,598.00 MARTIN COUNTY ARTIFICIAL REEF SURVEY, BIOLOGICAL MONITORING MARTIN COUNTY PURCHASING DIVISION $ 18,600.00 MARTIN COUNTY MULTIBEAM SURVE SURVEY, BIOLOGICAL MONITORING MARTIN COUNTY PURCHASING DIVISION $ 2,800.00 MARTIN CTY S. ARTIFICIAL REEF SURVEY, BIOLOGICAL MONITORING MARTIN COUNTY PURCHASING DIVISION $ 48,600.00 MARTIN COUNTY 2018 BIOLOGICAL SURVEY, BIOLOGICAL MONITORING MARTIN COUNTY PURCHASING DIVISION $ 36,300.00 MARTIN CNTY CORAL DISEASE OUT ENVIRONMENTAL CONSULTING MARTIN COUNTY PURCHASING DIVISION $ 9,960.00 2019 MARTIN COUNTY ARTIFICIAL SURVEY, BIOLOGICAL MONITORING MARTIN COUNTY PURCHASING DIVISION $ 44,800.00 HALLANDALE BEACH MOBI MAT ENVIRONMENTAL PERMITTING CITY OF HALLANDALE $ 3,500.00 HAULOVER-CRANDON PARK SLR STU INUNDATION MODELING, RESILIENT DESIGN MIAMI DADE COUNTY $ 94,328.00 MAURICE GIBB MEMORIAL PARK SURVEY, MARINE/CIVIL ENGINEERING, ENVIRONMENTAL PERMITTING CITY OF MIAMI BEACH $ 574,394.00 CITY OF SUNNY ISLES BCH ENVIR ENVIRONMENTAL PERMITTING CITY OF SUNNY ISLES BEACH $ 11,000.00 ISLAND DRIVE BRIDGE SEAWALL R CONSTRUCTION ADMINISTRATION CITY OF DELRAY BEACH $ 25,000.00 ST. LUCIE COUNTY 2019 ARTFCL BIOLOGICAL SURVEY ST. LUCIE COUNTY $ 15,697.00 ST. LUCIE COUNTY MITIGATION R ENVIRONMENTAL CONSULTING ST. LUCIE COUNTY $ 23,500.00 AGENCY NAME PROJECT SCOPE/PHASE CONTRACT AMOUNT 2015 Bell Air Crest, Inc.JSRR Source Removal Report 17,000.00$ Bell Air Crest, Inc.JSRRA Source Removal Report Addendum 2,500.00$ Megacenter Brickell, LLC JPH-2 Limited Phase II ESA 1,000.00$ City of Fort Lauderdale JSSR Soil Source Removal 210,061.50$ Gulfstream Petroleum Services, Inc.JSOIL Soils Screened 1,300.00$ Monroe County JPH-1 Phase I ESA - PO 00053675 1,900.00$ Monroe County JPH-2 Phase II ESA - PO 00054162 8,000.00$ Lakeland Housing Authority PH2 Phase 2 Environmental Site Assessment 6,905.00$ Lakeland Housing Authority SOILREM Phase 3, Soil Removel 10,430.00$ GALLAGHER BASSET TECHNICAL SERVICES | PUBLIC PROJECT LIST 2015-2020 August 18, 2020 Professional Consulting Services City of Sunny Isles Beach RFQ No. 20-07-01 Page 92 2016 Florida Department of Environmental Protection JLSSI Low Site Score Initiative 20,771.72$ Florida Department of Environmental Protection JLSSI Low Site Score Initiative 17,301.79$ Florida Department of Environmental Protection JLSSI Low Site Score Initiative 3,736.75$ Florida Department of Environmental Protection JLSSI Low Site Score Initiative 3,436.39$ Florida Department of Environmental Protection JLSSI Low Site Score Initiative 2,424.03$ Florida Department of Environmental Protection JLSSI Low Site Score Initiative 743.19$ Savino Miller Design Studio, P.A.JPH-1 Phase I ESA 3,000.00$ Savino Miller Design Studio, P.A.JPH-2 Phase II ESA 31,848.50$ Savino Miller Design Studio, P.A.JSARA Site Assessment Report Addendum 36,129.50$ Florida Department of Environmental Protection JSAR Site Assessment Report 18,347.59$ Florida Department of Environmental Protection JSAR Site Assessment Report 7,499.99$ City of Doral JABNDON Monitoring Well Abandonment 3,800.00$ City of Doral JPLAN Sampling Plan 1,000.00$ City of Doral JSAR Site Assessment Report 13,876.00$ City of Doral JSARA Site Assessment Report Addendum 10,000.00$ City of Doral JSARA2 Site Assessment Report Addendum II 20,000.00$ City of Doral JSARA3 Site Assessment Report Addendum III 2,200.00$ City of Doral JSOIL Soil Testing 2,000.00$ City of Doral JSAR Site Assessment Report 14,886.50$ City of Doral JSARA Site Assessment Report Addendum 8,000.00$ City of Doral JWAR Well Abandonment Report 2,900.00$ Monroe County Public Schools JCONS Consulting Services 9,300.00$ Miami Dade County JSUBINV Subsurface Investigation 25,000.00$ Florida Department of Environmental Protection JLSSI Low Site Score Initiative 17,400.01$ Florida Department of Environmental Protection JLSSI Low Site Score Initiative 4,079.19$ Florida Department of Environmental Protection JLSSI Low Site Score Initiative 3,955.59$ Florida Department of Environmental Protection JLSSI Low Site Score Initiative 3,336.56$ CORE5 Industrial Partners, LLC JPH-1 Phase I ESA - 20421 Sheridan Street 1,500.00$ CORE5 Industrial Partners, LLC JPH-2 Phase II ESA - 20421 Sheridan Street 13,000.00$ CORE5 Industrial Partners, LLC JREL Reliance Letter 500.00$ CORE5 Industrial Partners, LLC JSOIL Stockpile Soil Sampling (5)4,985.00$ CORE5 Industrial Partners, LLC JTCAR Tank Removal and Closure Assessment 9,000.00$ Florida Department of Environmental Protection JLSSI Low Scored Site Initiative 29,521.70$ Florida Department of Environmental Protection JLSSI Low Scored Site Initiative 25,819.42$ Florida Department of Environmental Protection JLSSI Low Scored Site Initiative 28,238.28$ Mana Miami Management, LLC JBSRA Brownfield Site Rehabilitation Agreement 800.00$ Florida Department of Environmental Protection LSRAP Limited Scope Remedial Action Plan 5,549.77$ Florida Department of Environmental Protection LSSI Low Scored Site Initiative 24,683.43$ Pasco County Schools ADMIN Admin Complex SPCC Plan Review 1,819.00$ Pasco County Schools WESLEY Wesley Chapel SPCC Plan 1,819.00$ August 18, 2020 Professional Consulting Services City of Sunny Isles Beach RFQ No. 20-07-01 Page 93 Pasco County Schools WIREGRA Wiregrass SPCC Plan 1,819.00$ PAW Demolition, Inc.CAUSTIC Caustic Line Decontamination 2,450.00$ Madeira Beach Town Center, LLC ATRP Abandoned Tank Restoration Program-LSSI 19,717.04$ Madeira Beach Town Center, LLC ATRP Abandoned Tank Restoration Program-LSSI 20,901.62$ 2017 Florida Department of Environmental Protection JLSSI Low Scored Site Initiative 16,487.63$ Florida Department of Environmental Protection JLSSI Low Scored Site Initiative 6,089.05$ Florida Department of Environmental Protection JLSSI Low Scored Site Initiative 3,789.74$ Florida Department of Environmental Protection JLSSI Low Scored Site Initiative 2,804.28$ Monroe County Public Schools JBID Construction Bid Package Addendum 8,500.00$ Monroe County Public Schools JSAR Site Assessment Report 18,900.00$ Monroe County Public Schools JSARA Site Assessment Report Addendum 24,500.00$ Monroe County Public Schools JSMP Soil Management & Health/Safety Planning 7,500.00$ Monroe County Public Schools SITEVST FEDP Notification & Site Visit for GAE 4,250.00$ Monroe County Public Schools JEXPH-2 Exp Phase II ESA 11,000.00$ Monroe County Public Schools JPH-1 Phase I ESA 1,900.00$ Monroe County Public Schools JPH-2 Phase II ESA 10,000.00$ Monroe County Public Schools JSMP Soil Management & Health & Safety Plan 5,000.00$ Grand Station Partners JPH-1 Phase I ESA 1,800.00$ Grand Station Partners JPH-2 Phase II ESA 9,000.00$ Mana Miami Management, LLC JPH-1 Phase 1 ESA 1,500.00$ Mana Miami Management, LLC JPH-2 Phase II ESA 10,000.00$ City of Hialeah Parks & Recreation JSOIL Soil Testing 1,500.00$ Hydra Engineering & Construction, LLC JTCAR Tank Removal and Closure Assessment 10,490.00$ Florida Department of Environmental Protection JLSSI Limited Site Assessment Report 12,272.62$ Florida Department of Environmental Protection JLSSI Limited Site Assessment Report 5,264.41$ Florida Department of Environmental Protection JLSSI Limited Site Assessment Report 2,700.20$ Florida Department of Environmental Protection JLSSI Low Scored Site Initiative - Area 1 1,146.23$ Florida Department of Environmental Protection JLSSI2 Low Scored Site Initiative - Area 4 1,146.23$ Florida Department of Environmental Protection JLSSI Low Scored Site Initiative (LSSI)16,821.11$ Florida Department of Environmental Protection JLSSI Low Score Site Initiative 13,341.39$ Tampa Electric Company LSSI Low Score Site Initiative 26,488.30$ Florida Department of Environmental Protection LSSI Low Scored Site Initiative 21,298.76$ Florida Department of Environmental Protection WELL Well Abandonment - WO# 2020-95-W2558B 3,552.48$ Florida Department of Environmental Protection LSSI Low Scored Site Initiative 11,738.50$ WCD Group LLC HYDOIL Hydraulic Oil Response & Sampling 2,779.94$ WCD Group LLC SOIL Soil Sampling 2,562.50$ 2018 Miami Freedom Park, LLC JPH1 Phase I ESA and Commission Presentation 2,500.00$ Miami Freedom Park, LLC JPH2 Phase II ESA - Site Rehabilitation Plan 149,000.00$ City of Doral JPH2 Phase II ESA 14,490.00$ August 18, 2020 Professional Consulting Services City of Sunny Isles Beach RFQ No. 20-07-01 Page 94 Assurant, Inc.JPH1 Phase I ESA 1,600.00$ Monroe County Public Schools JCOMP Composite Soil Sampling - Fuel Spill 750.00$ Monroe County Public Schools JSOIL Soil Sampling 1,400.00$ The College of the Florida Keys JPH1 Phase I ESA 1,800.00$ Miami Dade County JPH1-R1 Report 1: 72-4625 NW 24th Ave 2,000.00$ Miami Dade County JPH1-R2 Report 2: 60-2101 NW 52nd St.2,000.00$ Miami Dade County JPH1-R3 Report 3: NW 50 & NW 51st St.2,000.00$ Miami Dade County JPH1-R4 Report 4: 9-No Add. 12 S - 2600 NW 48 St 2,000.00$ Miami Dade County JPH1-R5 Report 5: NW 50th St.2,000.00$ City of Doral JPH1 Phase I Environmental Site Assessment 1,500.00$ City of Doral JPH2 Phase II Environmental Site Assessment 8,200.00$ St. Petersburg College JSRR De Minimis Source Removal 6,834.54$ St. Petersburg College SAR Site Assessment Report 19,397.66$ St. Petersburg College WELL Well Abandonment 1,866.00$ Lakeland Housing Authority JPH1 Phase I Environmental Site Assessment 2,850.00$ City of Ocala Growth Management JPH1 Phase I Environmental Site Assessment 2,800.00$ 2019 Miami Dade County JPH1 Phase I Environmental Site Assessment 1,800.00$ Florida City/The TREO Group, LLC JPH1 Phase I Environmental Site Assessment 1,600.00$ Florida City/The TREO Group, LLC JPH2 Phase II Environmental Site Assessment 8,800.00$ KVC Constructors, Inc./City Miami Beach JAIR Weekly Boundary Air Monitoring 6,000.00$ KVC Constructors, Inc./City Miami Beach JCONSUL Environmental Consulting 3,500.00$ KVC Constructors, Inc./City Miami Beach JDEWATR Dewatering Effluent Monitoring 14,330.00$ KVC Constructors, Inc./City Miami Beach JFILTER Bag Filter Characterization Sampling 750.00$ KVC Constructors, Inc./City Miami Beach JSAR Site Assessment Report 23,000.00$ KVC Constructors, Inc./City Miami Beach JSOIL Confirmation Soil Sampling 500.00$ KVC Constructors, Inc./City Miami Beach JSTOCKS Stockpile Sampling 4,000.00$ Gerald Adams Elementary School JSOIL Stockpile Soil Sampling 3,500.00$ Mega Center Miramar, LLC JPH1U Phase I ESA Update 1,800.00$ Opa-Locka Community Development Corporation (OLCDC) JAUL GBTS AULs & Environmental Lien 1,500.00$ Opa-Locka Community Development Corporation (OLCDC) JPH1 Phase I Environmental Site Assessment 2,000.00$ Monroe County School District JCONSUL Source Removal Oversight Project 4,000.00$ Monroe County Comprehensive Plan Land Authority JPH1 Phase I Environmental Site Assessment 1,900.00$ KVC Constructors, Inc.JWELL Groundwater Monitoring Well Installation 1,900.00$ OAC Action Construction Corp./USCG Air Station SLREM2 Soil Removal - Drain near Hydrant Area 2,800.00$ OAC Action Construction Corp./USCG Air Station SOILREM Soil Removal - PO# 0015 37,430.00$ OAC Action Construction Corp./USCG Air Station WELL Well Abandonment - PO# 0014 2,357.64$ Florida Department of Environmental Protection LSSI Low Score Site Initiative 16,544.01$ Turner Construction/Kennedy Space CTR-Cape Canaveral DISPOS Waste Disposal 1,200.00$ Turner Construction/Kennedy Space CTR-Cape Canaveral EFFSMP Initial Effluent Sampling 15,246.25$ August 18, 2020 Professional Consulting Services City of Sunny Isles Beach RFQ No. 20-07-01 Page 95 Turner Construction/Kennedy Space CTR-Cape Canaveral SOIL Soil Disposal 5,498.00$ 2020 Sumter County School Board DISPOSA Disposal of Hazardous / Construction Che 9,108.00$ Savino Miller Design Studio, P.A./Future Community Park JCONSUL Environmental Consulting Services 14,517.00$ The College of the Florida Keys JGPR&EM Ground-Penetrating Radar (GPR) and EM 3,500.00$ City of Miami Manatee Bend Park Site Lighting A. Task 1- Electrical Design Services 1. Prepare construction documents B. Task 2- Construction Administration Services 1. Pre-bid Meeting 2. Pre-Construction Meeting 3. Response to RFI's 4. Shop Drawing Review 5. Site Visits During Construction 6. Punch List Inspection 7. Final Inspection 11,799.00$ Agency Name Project Scope Contract Amount Miami-Dade County PHCD Little River Plaza Lift Station Design A. Design 1. Electrical 2. Plumbing 3. Survey B. Processing 1. Dry run through building department 2. Dry run through DERM as required 3. Dry run through WASD as required 4. Building Department Fees 5. Printing C. Construction Administration 1. Pre-bid meeting with contractors 2. Pre-construction meeting with selected contractor 3. Shop drawing review 4. Response to RFI's 5. Six (6) site inspections 6. Final site inspection 7. Printing 20,785.00$ Basulto & Associates | Project List 2015-2020 City of Miami Museum Park Walkway Solar Lighting Design of solar lighting installation including photometrics and pole mounting details for pathway. 3,203.00$ August 18, 2020 Professional Consulting Services City of Sunny Isles Beach RFQ No. 20-07-01 Page 96 Miami-Dade County Internal Services Dept. Medical Examiners 1. Selection of generator with sub- base day tank and hurricane rated, sound attenuated enclosure located within the existing site parking area. 2. Architectural study of site parking taking into account adjacent building parking garage and office space in order to account for lost parking spaces due to installation of generator. 3. Underground fuel piping from existing underground diesel fuel tank to new generator location. 4. Modification and additions to existing electrical switchgear taking into account separation of required emergency systems from optional systems. 5. Portable generator connection points and interconnection to electrical switch gear. 6. Concrete foundation for new generator. 7. Demolition of existing equipment, piping, etcetera that will no longer be in use. 77,780.00$ Town of Miami Lakes City Hall Generator Project 1. Adjust the electrical drawings to reflect the installation of the generator within a free-standing building. 2. Adjust the landscape drawings to reflect the installation of the generator within a free-standing building. 3. Provide new structural/architectural drawings for a free-standing building for the generator in lleu of a walled enclosure. 4. Provide new civil drawings to reflect adjustments to the walloways, grading around the new generator building. 5. Provide new mechanical drawings for ventilation of a free-standing 15,000.00$ August 18, 2020 Professional Consulting Services City of Sunny Isles Beach RFQ No. 20-07-01 Page 97 Agency Name Address Amount Miami Dade Aviation Dept Miami International Airport 200,000.00$ Miami Dade Fire Rescue 351 SW 107 Ave, Fire Station # 29 14,311.22$ Miami Dade Public Works South River Drive Improvement 49,972.69$ Miami Dade Public Works SW 98 St & SW 156 Ct 3,870.29$ Miami Dade Public Works SW 137 Ct between 111-109 St 3,870.29$ Miami Dade Public Works SW 98 St & SW 156 Ct 3,870.29$ Miami Dade Public Works NW 86 Terr from 16-19 Ave 3,989.48$ Miami Dade Public Works NE 2nd Ave from NE 69 to 84 St 63,322.97$ SPt borings for roadway improvement SPt borings for roadway improvement SPt borings for roadway improvement Engineering inspections, materials testing for NE 2nd Ave improvements SPT borings and matrials testing for baggage handling system improvement Ardaman & Associates | Public Project List Scope of work SPT borings and materials testing SPT borings along South River Dr from NW 25 to 31 Street SPt borings for roadway improvement Agency Name Project Name/Scope Contract Amount City of Miami Maurice A. Ferre Park - master planning, planting, hardscape, site furnishing and irrigation 330,000.00$ Miami-Dade County Parks, Recreation & Open Sapce Gwen Cherry Park - master planning, playground design, planting and hardscape 37,925.00$ Miami Downtown Development Authority Miami Baywalk & Riverwalk Design Guidelines - planting, hardscape, urban design, resiliency guidelines, design guidelines, and unifying design elements 160,000.00$ City of Coral Gables Coral Gables Dog Park - master planning, planting, hardscape, site furnishing and irrigation 69,000.00$ City of Coral Gables Solano Prado Park - master planning, planting, hardscape and irrigation 10,000.00$ City of Miami Beach Bayshore Park - master planning, planting, hardscape, lighting, site furnishings, water feature and irrigation 350,000.00$ City of Miami Beach West Avenue Streetscape - planting, hardscape, irrigation 300,000.00$ Village of Biscayne Park Biscayne Park Signage - signage, planting and lighting design 8,500.00$ City of Miami Beach LGBT Ocean Drive Crosswalk - paving design 5,000.00$ Savino and Miller Design Studio | Public Project List 2015-2020 Town of Miami Lakes Generator Enclosure Wall 1. Structural design of wall and gate enclosure for generator. 2. Modifications to landscape drawings to account for new wall. 3. Modifications to electrical drawings to account for new wall. 4,200.00$ August 18, 2020 Professional Consulting Services City of Sunny Isles Beach RFQ No. 20-07-01 Page 98 SubSubSubSub----cccconsultant Ronsultant Ronsultant Ronsultant Referenceseferenceseferenceseferences Gallagher Basset Technical Services: Ms. Ellen Buckley TCH 500 Alton, LLC 2665 S. Bayshore Drive, Suite 1020 Coconut Grove, Florida 331333 Tel: (305) 416-4556 Email: ebuckley@terragroup.com Mr. Mitch Friedman Pinnacle Housing Group, LLC 9400 S. Dadeland Blvd., Suite 100 Miami, Florida 33156 Tel: (305) 854-7100 Email: mitch@pinnaclehousing.com Basulto & Associates: Ms. Aundria Blatch Miami-Dade County Internal Services Department 111 NW 1st Street, Suite 2130 Miami, Florida 33128 Tel: (305) 375-5339 Email: ablatch@miamidade.gov Savino & Miller Design Studio: Mr. Joseph Milton J. Milton & Associates 3211 Ponce de Leon Blvd., Suite 301 Coral Gables, Florida 33146 Tel: (305) 460-6300 Email: josephmilton@j-milton.com Mr. Neal Schafers Miami Downtown Development Authority 200 S. Biscayne Blvd., #2929 Miami, Florida 33131 Tel: (305) 579-6675 Email: schafers@miamidda.com Mr. Lawrence Kline Perkins & Will 2800 Ponce de Leon Blvd., #1300 Coral Gables, Florida 33134 Tel: (305) 569-1333 Email: lawrence.kline@perkinswill.com Traf Tech Engineering: Mr. Chris Suneson City of Coral Springs 9500 West Sample Road Coral Springs, Florida 33065 Tel: (954) 344-1028 Ms. Shannon Ley City of Sunrise 1607 NW 136th Avenue, Bldg. B Sunrise, Florida 33323 Tel: (954) 746-3288 5555 Corporate Standing and Corporate Standing and Corporate Standing and Corporate Standing and Authorized SignatoryAuthorized SignatoryAuthorized SignatoryAuthorized Signatory August 18, 2020 Professional Consulting Services City of Sunny Isles Beach RFQ No. 20-07-01 Page 99 Corporate Good StandingCorporate Good StandingCorporate Good StandingCorporate Good Standing 6666 Forms & AttachmentsForms & AttachmentsForms & AttachmentsForms & Attachments Page 100 Page 101 Page 102 Page 103 Page 104 Page 105 Page 106 Page 107 Page 108 Page 109 Page 110 Page 111 The following lists all claims, arbitrations, administrative hearings and lawsuits brought by or against the Proposer or its predecessor organization(s) during the last ten (10) years. Litigation History:Litigation History:Litigation History:Litigation History: M.K. Contractors vs. Main Highway M.K. Contractors vs. Main Highway M.K. Contractors vs. Main Highway M.K. Contractors vs. Main Highway Development, LLCDevelopment, LLCDevelopment, LLCDevelopment, LLC Coastal Systems International was named as a co-defendant in the litigation, M.K. Contractors vs. Main Highway Development, LLC., Zyscovich, Inc., Louis J. Aguirre & Associates, P.A., DDA Engineers, P.A., Kaderabek & Barreiro Consultants, Inc., and Coastal Systems International. The case number is 10-01409 CA25 as filed in the Circuit Court of Eleventh Judicial Circuit in Miami-Dade County. The General Contractor, M.K. Contractors, for the Project filed a claim against the developer and the architectural/engineering consultants on the project on January 12, 2010. The construction for the project was completed in 2007. Coastal Systems filed a motion to dismiss the claim on January 29, 2010 for failure to state a cause of action on the professional negligence and violation of Florida statute counts. M.K. Contractors is an incidental third-party beneficiary to the work performed by Coastal Systems. The design work completed by Coastal Systems was limited to the site/civil engineering and underground utilities, and therefore Coastal Systems was not involved in any structure of the Condominium, therefore making the Building Code claims inapplicable. This case was settled out of court in July 2014. Canyon Ranch DevelopmentCanyon Ranch DevelopmentCanyon Ranch DevelopmentCanyon Ranch Development The plaintiffs include the two condominium associations that filed 558 claims in August 2014 against the consulting team that included Coastal Systems. Coastal Systems only provided Coastal Permitting services for these projects that are now part of the Canyon Ranch development. No engineering design services were provided, and Coastal Systems has disputed the 558 claims. Further litigation has not been filed to date. American Automobile Ins Co vs GT McDonald Enterprises IncAmerican Automobile Ins Co vs GT McDonald Enterprises IncAmerican Automobile Ins Co vs GT McDonald Enterprises IncAmerican Automobile Ins Co vs GT McDonald Enterprises Inc The plaintiff is the insurance company that provided coverage to the Gale Hotel for sewage back-up as a result of the City of Miami Beach sewage pump station not functioning. Sewage backed-up into the building, and the backflow preventers and other appurtenances referenced in the claim are the responsibility of the building Mechanical/Electrical/Plumbing (MEP) engineer and not Coastal Systems as the site/civil engineer. The claim was filed in September 2014. Coastal Systems disputes the claim. The client served a notice for trial and we will likely have to settle or attend mediation. Capri South Beach Capri South Beach Capri South Beach Capri South Beach A 558 claim has been filed August 2014, and Coastal Systems has coordinated with the General Contractor to address maintenance issues with the site/civil improvements referenced in the 558 claim. Coastal Systems is of the opinion that the alleged defects have been adequately address. To date, no litigation has been filed. The file has been closed by the insurance company. Page 112 South of FifthSouth of FifthSouth of FifthSouth of Fifth A 558 claim has been filed in April 2015. Coastal Systems was the civil engineer on the project and none of the deficiencies described in the report resulted from the services provided. To date, no litigation has been filed. The file has been closed by the insurance company. Eloquence on the Bay Eloquence on the Bay Eloquence on the Bay Eloquence on the Bay A 558 claim has been filed in September 2015. Coastal Systems denies that any of the deficiencies described in the Epic Forensics & Engineering Report resulted from the services performed. Further litigation has not been filed to date. Horizon EastHorizon EastHorizon EastHorizon East A legal notice was received in January 2016 from a neighboring property of the 3550 S Ocean Boulevard project Coastal Systems was providing services for. Coastal Systems prepared design documents for a seawall replacement project at 3550 which required the contractor to hire an independent testing lab to monitor vibrations during piling installation. The plans also required the contractor to repair any damage that might be caused by their work. Coastal Systems did not act as the contractor or testing lab and did not perform any construction activities at the location. Coastal declined the offer to inspect the damage described by the neighboring property and disclaims any responsibility or liability for the damage. Aquazul CondominiumAquazul CondominiumAquazul CondominiumAquazul Condominium A 558 claim has been filed in July 2016. Coastal Systems' involvement in this project was limited to environmental permitting and Coastal analysis/engineering. The company was not involved in any work related to the fire suppression system. To date, no litigation has been filed. The file has been closed by the insurance company. Marina PalmsMarina PalmsMarina PalmsMarina Palms A legal notice was received in June 2017 against the consulting team that included Coastal Systems. Coastal Systems provided coastal engineering and permitting services for this project. Coastal Systems provided documents associated with the Marina Palms project. Further litigation has not been filed to date. This case was settled out of court in April 2019. Page 113 Page 114 Page 115 ANY PROPRIETOR/PARTNER/EXECUTIVEOFFICER/MEMBER EXCLUDED? INSR ADDL SUBR LTR INSD WVD PRODUCER CONTACT NAME: FAXPHONE (A/C, No):(A/C, No, Ext): E-MAIL ADDRESS: INSURER A : INSURED INSURER B : INSURER C : INSURER D : INSURER E : INSURER F : POLICY NUMBER POLICY EFF POLICY EXPTYPE OF INSURANCE LIMITS(MM/DD/YYYY) (MM/DD/YYYY) AUTOMOBILE LIABILITY UMBRELLA LIAB EXCESS LIAB WORKERS COMPENSATION AND EMPLOYERS' LIABILITY DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) AUTHORIZED REPRESENTATIVE EACH OCCURRENCE $ DAMAGE TO RENTEDCLAIMS-MADE OCCUR $PREMISES (Ea occurrence) MED EXP (Any one person) $ PERSONAL & ADV INJURY $ GEN'L AGGREGATE LIMIT APPLIES PER:GENERAL AGGREGATE $ PRO-POLICY LOC PRODUCTS - COMP/OP AGGJECT OTHER:$ COMBINED SINGLE LIMIT $(Ea accident) ANY AUTO BODILY INJURY (Per person) $ OWNED SCHEDULED BODILY INJURY (Per accident) $AUTOS ONLY AUTOS HIRED NON-OWNED PROPERTY DAMAGE $AUTOS ONLY AUTOS ONLY (Per accident) $ OCCUR EACH OCCURRENCE CLAIMS-MADE AGGREGATE $ DED RETENTION $ PER OTH-STATUTE ER E.L. EACH ACCIDENT E.L. DISEASE - EA EMPLOYEE $ If yes, describe under E.L. DISEASE - POLICY LIMITDESCRIPTION OF OPERATIONS below INSURER(S) AFFORDING COVERAGE NAIC # COMMERCIAL GENERAL LIABILITY Y / N N / A (Mandatory in NH) SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). COVERAGES CERTIFICATE NUMBER:REVISION NUMBER: CERTIFICATE HOLDER CANCELLATION © 1988-2015 ACORD CORPORATION. All rights reserved.ACORD 25 (2016/03) CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY) $ $ $ $ $ The ACORD name and logo are registered marks of ACORD COAST-1 OP ID: GF 01/21/2020 Gail Fulmore Tanenbaum Harber of Florida 2900 SW 149th Avenue Miramar, FL 33027-6605 Pat Murphy 954-883-2900 954-517-7400 gfulmore@thflorida.com Northfield Insurance Company Hartford Underwriters Ins. Co. Coastal Systems International, Inc. 464 S. Dixie Highway Coral Gables, FL 33146 Commerce & Industry Ins. Co. Beazley Insurance Co.Inc. USA A X 1,000,000 X WS411238 01/20/2020 01/20/2021 300,000 5,000 1,000,000 2,000,000 X 2,000,000 1,000,000B X 21UECIN8962 01/20/2020 01/20/2021 X X X 3,000,000 X C EBU020701254 01/20/2020 01/20/2021 3,000,000 n/a n/a n/a D V15R12201301 01/30/2020 01/30/2021 Per Claim 1,000,000 Claims Made RETRO DATE N/A Aggregate 2,000,000 0000001 ****************************** FOR INSURANCE INFORMATION PURPOSES ONLY***************** ****************************** 954-883-2900 37987 30104 19410 37540 Professional Liab Page 116 Coastal Engineering, Waterfront & Marinas, Civil Engineering, Regulatory Permitting, Site Investigations, Marine Environmental, Construction & Destination Development 464 South Dixie Highway, Coral Gables, FL 33146 Tel: 305-661-3655 | Fax: 305-661-1914 www.coastalsystemsint.com info@coastalsystemsint.com C O A S T A L S Y S T E M S I N T E R N A T I O N A L, I N C.