Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Premiere Design Solutions, Inc (reduced)
RFQ No: 20-07-01 CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) 1065 NE 125th St, #211B, North Miami, FL 33161 P. 954-237-7850 - F. 954-337-2332 Gustavo Eckardt, Project Manager Email: Ljurado@pds-eng.com AUGUST 18, 2020 Section A Title Page RFQ No: 20-07-01 CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) 1065 NE 125th St, #211B North Miami, FL 33161 P. 954-237-7850 F. 954-337-2332 Email: Ljurado@pds-eng.com Gustavo Eckardt, Project Manager AUGUST 18, 2020 2 Section B Table of Contents RFQ No: 20-07-01 CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) 3 Table of Contents A – Title Page ……………………………………………………………………….…….… B – Table of Contents …………………………………………………….….….…… C – Cover Letter and Executive Summary ………………….……... D – Project Approach and Understanding ………………………... E – Qualification Information and Assigned Personnel .. F – Firm References and Similar Work Completed ….…..… G – Corporate Standing and Authorized Signatory …..…... H – Forms and Attachments ……………………………………………...….. RFQ No: 20-0324200 REQUEST FOR QUALIFICATIONS (RFQ) ARCHITECTURAL AND ENGINEERING CONSULTING SERVICES 2 3 5 27 48 129 226 231 4 ` Section C Cover Letter and Executive Summary RFQ No: 20-07-01 CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) 5 RFQ No: 20-07-01 CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) i. Civil Engineers Category Cover Letter and Executive Summary 6 RFQ No. 20-07-01 City of Sunny Isles Beach August 2020 C. Cover Letter and Executive Summary August 18, 2020 City of Sunny Isles Beach To Whom It May Concern: Premiere Design Solutions, Inc. (PDS) provides a wide range of engineering services, cost engineering and construction phase services in civil land transportation engineering to serve the needs of our clients. We plan, design, and oversee construction of facilities to meet our client’s needs. We craft integrated management strategies to make the most of limited resources while serving multiple stakeholders. Most important, we work closely with each client to make sure that our innovative and cost-saving solutions are tailored to their individual needs. Mr. Luis Jurado, PE is the President of PDS and is committed with the City of Sunny Isles on this project to provide exceptional service, as PDS is known for, and will ensure that appropriate staff levels are provided to meet and exceed the City’s expectations. Currently, PDS holds several engineering contracts on an ongoing basis and other task specific contracts, and our staff is working at a 65% capacity, allowing some project growth before needing additional staff. However, de pending on size of contracts, PDS as a small business has the flexibility to hire new staff as needed, without going through extensive selection process. Currently PDS has a Resume Bank with candidates that have been prescreened and some have already interviewed with PDS, making a selection of additional engineers, CAD Drafters, Engineering Inspectors and Administrative staff a relatively fast process, led by MR. Jurado, as needed by the City of Sunny Isles Beach. We understand the City of Sunny Isles Beach is seeking Professional Engineering Services for contracts not exceeding $4 Million in construction costs were work order contracts do not exceed $500,000 in fees. PDS is a minority owned, small business, incorporated five years ago in Broward County, with offices in Miramar, Miami, and South Carolina. PDS is experienced in this type of work, and we are willing to work with the City, finding the best solution to your needs, and will work with other firms currently holding architectural/engineering contracts with the City as a sub- consultant to their contracts. We also acknowledge that PDS will maintain all its current certifications, licenses and insurances throughout this contract. We are proposing our services as prime consultant for Civil Engineering Services, and are not committing to any specific sub-consultant for this project. We work with sub-consultant firms capable of providing all services the city may require, which we have an ongoing relation and current track record, but in the best interest of the City, we have decided to submit this proposal as a sole an prime consultant, and sub- consultant will be procured on a work order basis, keeping the City project manager involved during the process if desired. PDS currently holds three continuing architectural/engineering services contracts, as a prime consultant, with City of Miami Gardens, Miami-Dade Transit and with Broward County Transit, 7 RFQ No. 20-07-01 City of Sunny Isles Beach August 2020 C. Cover Letter and Executive Summary and as subconsultants participate in many other General Engineering Contracts such as this one. These contracts include teams of nearly ten firms, as sub-consultants to provide all ranges of architectural and engineering services, which could be put to the disposition of the City as required by a specific work order. Our firm is capable of providing in-house the follow engineering services: Civil Engineering Design Environmental Engineering Services Topographic Surveying Services (Inc. LIDAR, Plats, Legal Descriptions) Roadway Design Transit Improvements Feasibility Studies and Master Planning Utility and Site Planning Wastewater Collection & Treatment Storm water Sanitary Sewer Engineering Geographic Information Systems (GIS) - Updates, data collection and Integration Water Quality Transit, & Transportation (Traffic Studies, Roadways, Parking) Water Supply Distribution 40 Year Building Re-Certifications Building Envelope System Assessment and Quality Control Preparation of Construction Documents including Bid Docs and Specifications Bid Support Services (RFI Response, Bid verification/Tabulations, recommendation) Engineering Construction Plans Federally Funded Projects Permitting at local, municipal, state and federal levels Cost Engineering and Scheduling Construction Management and Inspections Public Information Support The firm’s senior staff brings over 100 years of combined experience in civil and Transportation engineering, construction management, GIS, cost engineering and scheduling. PDS has extensive technical expertise and capabilities to plan, design, and oversee construction of facilities and infrastructure projects to meet the client’s needs, and most importantly, ensure projects are delivered within the assigned schedule and under the available budget. PDS’ staff brings extensive experience in the areas of land development, transit and public infrastructure improvement projects, water resources and distribution systems, wastewater collection systems, utility design, utility coordination, permitting and water and wastewater facilities upgrades and improvements. In addition to this, PDS is very familiar working as an extension of your staff, having worked for municipal clients in nearly 90% of our projects. Some of our clients include, City of Miami Gardens, City of Miami Lakes, City of Opa-Locka, City of Hallandale Beach, Miami-Dade Water and Sewer, Miami-Dade Transit and Broward County Transit. 8 RFQ No. 20-07-01 City of Sunny Isles Beach August 2020 C. Cover Letter and Executive Summary But most importantly, we are certain the City will benefit from selecting PDS due to our unparalleled service, with unmatched responsiveness. All of our Key staff carry cell phones that are available 24 hours a day, every day, with numbers printed on our business cards, so we will always be just a phone call away. Premiere Design Solutions, Inc. (PDS) is a local MBE and DBE minority firm, established as a Florida Corporation in Broward County on June 19, 2007 with headquarters in Miramar, and offices in North Miami and South Carolina, licensed and certified to do business in the State of Florida as Professional Engineers and Professional Land Surveyors. Our state license and other applicable certifications, such as the FDOT and County prequalification are attached with our minority certifications at the end of this response. This contract will be serviced from our Headquarters located in Miramar, Broward County, Florida, not only because its our closest location to the City of Sunny Isles Beach, but also offers our widest range of resources. Our Miramar office is less that 30 minutes away any location within the City of Sunny Isles Beach. Our Headquarters staff work very closely with the Miami Office personnel, and have an integrated system, where both offices work off a single server, with remote connection, video conference capabilities and capable to share resources seamlessly. Below is a map and addresses of our locations: 9 RFQ No. 20-07-01 City of Sunny Isles Beach August 2020 C. Cover Letter and Executive Summary PDS is a relatively young firm with a bright future ahead. In its short history, PDS has been able to secure important contracts such as the Continuing Architectural/Engineering Services Contract in Federally Funded projects with Miami-Dade Transit, the Continuing Architectural/Engineering Services Contract projects with Broward County Transit, GIS input on all water and wastewater infrastructure assets in the City of Miami Gardens, working for the Miami-Dade Water and Sewer Department, all the utility design and coordination for the expansion of the Runway of the FLL Airport, civil engineers for the GEC contract with Broward County Aviation Division. All of these projects give stability to the company and allow for future growth. These projects were procured and are being executed with the PDS approach to help our clients no matter what. The PDS approach is to put aside profit and multipliers and focus on the big picture, bottom line and the necessities our municipalities have, and do whatever it takes to provide our services and help reach these goals. Yes, PDS is a Corporation, and not a Not-For-Profit Corporation, but we realize that as a young firm, we need to demonstrate our capabilities. We are sure that once we are given the opportunity to work in a project, our clients will call us back for more work, and that is the PDS approach. Broward County Corporate Headquarters 12781 Miramar Pkwy, Ste 205 Miramar, FL 33027 Professional Staff: 8 Miami-Dade County North Miami Branch 1065 NW 125 Street N.Miami, FL 33161 Professional Staff: 6 York County South Carolina Branch 150 Oakland Avenue, Suite 215 Rock Hill, SC 29732 Professional Staff: 1 10 RFQ No. 20-07-01 City of Sunny Isles Beach August 2020 C. Cover Letter and Executive Summary This approach that has already proven itself, as we receive most of our business from repeat clients, demonstrating the high level of satisfaction our clients receive from PDS. Our business model has also contributed to receive an award as Miami-Dade County Firm of the Year in 2019, and also as one of the top 100 minority firms in Miami, awarded by the Greater Miami Chamber of Commerce in 2012. PDS was founded in the verge of one of the worst economic depressions of recent history. However, implementing the PDS Approach, with unparalleled service and quality in our deliverables, PDS has managed to grow exponentially since its inception. Premiere Design Solutions, Inc. was founded as a Corporation by Mr. Luis Javier Jurado, P.E. in 2007 with the goal of offering exceptional service and high quality engineering services to private and government clients. Mr. Luis Jurado, P.E. (President) decided to open the business with the vision of offering cost effective engineering solutions with minimal impacts to the environment. PDS was established as a minority owned and operated firm to provide high- quality Civil Engineering, Land Development and construction management services to the private and public sectors throughout the Southeast United States. Later, PDS added Land Surveying as one of its core services to be able to provide client an integrated one stop solution to their needs. The firm's most valuable asset: our professional staff has more than 100 years of experience in consulting and engineering services that include pre-design, design, construction management, inspection, storm-water, water and wastewater, environmental compliance, land development, site remediation, feasibility studies, value engineering, permitting, land surveying and design/build projects. 11 RFQ No. 20-07-01 City of Sunny Isles Beach August 2020 C. Cover Letter and Executive Summary PDS’s board of directors drafted and executed a unique business plan that has been successful in growing the company at a pace of 100% year over year during these very hard economic times. PDS continues to evolve as a multidisciplinary consulting firm that serves public and private clients, and a broad array of markets with one goal: Provide excellent service to our clients, with high quality, reliability, honesty, respect, and integrity in doing business. PDS’ reputation for excellence in the industry remains a core value since the firm's inception. Our firm is capable of integrating all of our services and any others from sub-consultants and provide the City with a single point of contact and responsibility, to enhance communications, and will enforce our QA/QC procedures throughout the project. All deliverables will be reviewed by professional qualified staff, not related to the project, to ensure completeness and quality of submittals. We respectfully request your consideration of this proposal to provide our services to the City of Sunny Isles Beach, and request your selection of our firm to enter into a continuing contract agreement. Our firm understands that if selected, PDS is willing to meet any location, budget or task order assigned to our firm. Respectfully yours, Luis J. Jurado, P.E. President Premiere Design Solutions, Inc. Address: 1065 NE 125th St, #211B, North Miami, FL 33161 Phone: 954.237.7850 extension 701 Mail: Ljurado@pds-eng.com 12 RFQ No: 20-07-01 CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) ii. Surveyors and Mapping Category Cover Letter and Executive Summary 13 RFQ No. 20-07-01 City of Sunny Isles Beach August 2020 C. Cover Letter and Executive Summary August 18, 2020 City of Sunny Isles Beach To Whom It May Concern: Premiere Design Solutions, Inc. (PDS) provides a wide range of Land Surveying and engineering services, cost engineering and construction phase services in civil and transportation engineering to serve the needs of our clients. We conduct land surveying for planning services, for design, and also provide construction phase surveying services to meet our client’s needs. We craft integrated management strategies to make the most of limited resources while serving multiple stakeholders. Most important, we work closely with each client to make sure that our innovative and cost-saving solutions are tailored to their individual needs. Mr. Luis Jurado, PE is the President of PDS and is committed with the City of Sunny Isles on this project to provide exceptional service, as PDS is known for, and will ensure that appropriate staff levels are provided to meet and exceed the City’s expectations. Currently, PDS holds several land surveying contracts on an ongoing basis and other task specific contracts, and our surveying staff is working at a 55% capacity, allowing some project growth before needing additional staff. However, depending on size of contracts, PDS as a small business, has the flexibility to hire new staff as needed, without going through extensive selection process. Currently PDS has two survey crews in house with an on-call survey crew than can be assembled is work load increases or as needed by the City of Sunny Isles Beach. We understand the City of Sunny Isles Beach is seeking Professional Engineering Services for contracts not exceeding $4 Million in construction costs were work order contracts do not exceed $500,000 in fees. PDS is a minority owned, small business, incorporated five years ago in Broward County, with offices in Miramar, Miami, and South Carolina. PDS is experienced in this type of work, and we are willing to work with the City, finding the best solution to your needs, and will work with other firms currently holding architectural/engineering contracts with the City as a sub- consultant to their contracts. We also acknowledge that PDS will maintain all its current certifications, licenses and insurances throughout this contract. We are proposing our services as prime consultant for Land Surveying Services, and are not committing to any specific sub-consultant for this project. We work with sub-consultant firms capable of providing all services the city may require, which we have an ongoing relation and current track record, but in the best interest of the City, we have decided to submit this proposal as a sole an prime consultant, and sub- consultant will be procured on a work order basis, keeping the City project manager involved during the process if desired. PDS currently holds two continuing land surveying contracts as a prime consultant, with City of Miami Gardens, and in the Survey Pool of Miami-Dade, and as subconsultants participate in many other General Engineering Contracts such as this one to provide land surveying services. 14 RFQ No. 20-07-01 City of Sunny Isles Beach August 2020 C. Cover Letter and Executive Summary Our firm is capable of providing in-house the follow land surveying services: ñ Topographic and Boundary Surveys ñ ALTA Surveys ñ Land Surveying ñ Elevation Certificates ñ Pipeline Route Surveys ñ Global Positioning System (GPS) data collection ñ Right-of-Way Survey ñ Underground Utility Investigation Surveys ñ As-Built Surveys ñ Project Stake-Out and Delineation ñ Roadway Surveys ñ Sidewalk Existing Condition & ADA Assessment ñ Hydrographic or Underwater Surveys Premiere Design Solutions, Inc. (PDS) proudly offers a wide array of high quality land surveying and topographic services. All of our work is performed with state of the art equipment renewed in 2020 and by or under the strict supervision of our chief surveyor and licensed professional, ensuring our clients that the quality, accuracy and completeness of our products are of great precision. Within our services, the most common are the following: Ground Surveying and Mapping: Through these services, PDS Provides conventional ground mapping techniques for design quality engineering. We map the utility paint-outs and locate all above ground features and collect topographic elevations of existing ground or coverings. We then merge ground mapping to establish the project base map in the prescribed tile system or coordinates. We can develop seamless digital terrain model (DTM) to create contours and then a final base map according to clients CAD drafting and layering standards. For these services, PDS utilizes in house RTK/GPS Rover, Digital Leica Total Station, Digital Data Collectors, Level, Transits, as well as conventional support equipment’s. Geodetic Control Surveys: Establish a project control network throughout the project reach via static GPS and electronic leveling technology. Right of Way Acquisition Support: PDS can also provide right of way acquisition/appraisal support documentation. We employ our RTK/GPS surveying to tie all land monuments that control the route properties and prepare right of way plans showing parcel numbers, owners names, existing right of ways, subdivision lotting, section lines and planimetric features from the base maps. Provide parcel-taking exhibits for each owner. Write legal descriptions for each parcel with area values before and after take. Land Surveying: Prepare short plats, boundary line adjustments, ALTA surveys, record of surveys and municipal utilities permit drawings as needed for acquisition and relocation. Field stake parcels and prepare legal descriptions as required. For these services, PDS utilizes in house RTK/GPS Rover, Digital Leica Total Station, Digital Data Collectors, Level, Transits, as well as conventional support equipment’s. Construction Phase Surveying and Stake-Out: PDS also provides stakeout services to accurately establish construction control points to allow contractors build and construct improvements in accordance to the contract drawings. Stake out services include constant monitoring and re-staking of construction progress, and final location of improvements in certified as-built plans. 15 RFQ No. 20-07-01 City of Sunny Isles Beach August 2020 C. Cover Letter and Executive Summary PDS's highly skilled and trained professionals have the ability to plan for and execute all of the above mentioned surveys, in projects that range from the very simple and small to the very complex and large. Attention is always focused in the data collected and measurements are always verified and crosschecked, with GPS and manual methods. Using our industry standard state-of-the-art equipment, and highly trained professionals, PDS is capable to collect, processes, and stores a vast amount of topographic data and adjust to the clients needs quickly to deliver project on time and on budget. The Geographic Information Systems (GIS) capabilities of Premiere Design Solutions, Inc can be seamlessly integrated with information from our survey crews to generate accurate field condition assessments, verification of utilities and resolution of GIS model inconsistencies. All of our deliverables go through a strict quality control plan, than extends from the field to the office. Field data is collected, and verified, then imported to AutoCAD Civil 3D were plans are generated in a layered environment with clear symbols. Survey plans then undergo a review, by the land surveyor to ensure accuracy and adequacy of benchmarks, coordinates and vertical datum used. In addition, a professional engineer to provide design and engineering comments on surveys, and reviewing accuracy with any available project information. Finally a constructability check is done to randomly verify accuracy of documents comparing with field conditions. All final deliverables are signed and sealed by a Florida Registered Land Surveyor and Mapper. The list below includes a broader sample of Land Surveying services type and specific project recently provided by PDS. LAND SURVEYING SERVICES AND CAPABILITIES Project Type Recent PDS Project Control Surveys can be required for any project that has a requirement for repeatable and usable coordinates or locations including engineering design and construction projects. We have performed control surveys as part of larger projects or stand alone activities and are adept at working in urban and remote settings. Pembroke Pines City Center Construction Controls, Including site and building layout Surveying plays an important role in any construction project. Our surveyors can provide staking for various construction projects including Land Development, highways, pipelines, roadways, drainage and buildings. Biscayne Landing in North Miami, Spine Road Construction Controls As-Built Surveys are designed to locate new or existing man made items. They can be used to aid in design, construction and demolition FLL South Runway Expansion Water & 16 RFQ No. 20-07-01 City of Sunny Isles Beach August 2020 C. Cover Letter and Executive Summary and can be part of larger multi-faceted projects. Sewer Utilities As-Builts Construction surveys include research to obtain data essential for planning, estimating, locating, and layout for the various phases of construction activities or projects. This type of survey includes reconnaissance, preliminary, location, and layout surveys. Other surveys we perform include design engineering surveys, topographic surveys, and GPS and conventional control surveys. Saint Agnes entrance Reconstruction and Roadway control and staking Boundary surveys are performed to determine lines of ownership. They may require recovering and retracing historic boundary information and sometimes require the determination of property lines and the setting of survey monuments. Our survey methods for these projects are conventional instruments, GPS techniques or both. Broward County Transit Improvement Surveys Topographic surveys gather data about natural and man-made features of the land, as well as its elevations. For these surveys our staff will establish horizontal and vertical control that will serve as the framework of the survey; determine horizontal location and elevation (side shots) of ground points to provide enough data for plotting the map and locate features that may be required by the survey; compute distances, angles, and elevations; and prepare a three-dimensional topographic map. Pembroke Pines City Center Site topographic ALTA survey Utility, right-of-way, and route Surveys require solid information as the foundation of good engineering design. We can provide support that incorporates land, hydrographic and geophysical surveys. Our surveyors can work closely with your engineers and planners to design a data collection program that will get the information required and produce the GIS and CAD work necessary for engineering design to provide preliminary and final locations for linear and above ground features, such as roadways, pipelines and utilities. These surveys can be accomplished with a variety of land survey tools. Citywide Roadway Route Surveys for the City of Opa-Locka Capital Improvements program Volume Determination Our surveyors are experienced at estimating excavation pit volumes, stockpile material and dredge volumes using both linear and nonlinear survey methods. Data can be obtained through land or hydrographic surveying and is often a combination of the two. Calculating these volumes is accomplished with Digital Terrain Modeling (DTM) and are important for many engineering and construction projects and will often determine pay for the construction contractor. We can provide land survey of excavation sites to determine the amount of material removed and the adherence to design elevations and slopes. Biscayne Landing in North Miami Land Fill Closure and site development, stockpile verification and lake filling operation Volume Determination Survey 17 RFQ No. 20-07-01 City of Sunny Isles Beach August 2020 C. Cover Letter and Executive Summary Recognizing the ties between Land Surveying, field data collection, Engineering and GIS applications, PDS has also an established Engineering department and GIS capabilities to provide our clients a one stop shop for Civil engineering and Utility needs, with registered Professionals in Land Surveying and Mapping and Engineering, and state of the art equipment, computers and software to provide a complete service to our Clients, and the availability to accurately collect field information and bring it to an accurate GIS model. Information is collected and inserted into AutoCAD format drawings using the required hardware and software systems, usually state plane coordinates for horizontal locations collected with GPS technology and elevations to NAVD 88 or the older NGVD 29 vertical datum systems. This creates and accurate 3D model of field features that our GIS Technicians or engineers can easily import into a GIS model or a design and improvement project. PDS is committed to offering exceptional service to our Clients. Our professional staff will meet and understand the needs of our clients to develop a tailored action plan and provide the most efficient service that will exceed the Client’s expectations. The firm’s surveying senior staff brings over 50 years of combined experience in Land Surveying of civil and Transportation engineering, construction management, GIS, cost engineering projects. PDS has extensive technical expertise and capabilities to plan, design, and oversee construction of facilities and infrastructure projects to meet the client’s needs, and most importantly, ensure projects are delivered within the assigned schedule and under the available budget. PDS’ staff brings extensive experience in the areas of land surveying, underground utility investigations, Right-of-Way determination, collection of elevations, and above ground features of private and public infrastructure improvement projects, as well as construction stake-outs and as-builts upon project completion. In addition to this, PDS is very familiar working as an extension of your staff, having worked for municipal clients in nearly 90% of our projects. Some of our clients include, City of Miami Gardens, City of Miami Lakes, City of Opa-Locka, City of Hallandale Beach, Miami-Dade Water and Sewer, Miami-Dade Transit and Broward County Transit. But most importantly, we are certain the City will benefit from selecting PDS due to our unparalleled service, with unmatched responsiveness. All of our Key staff carry cell phones that are available 24 hours a day, every day, with numbers printed on our business cards, so we will always be just a phone call away. Premiere Design Solutions, Inc. (PDS) is a local MBE and DBE minority firm, established as a Florida Corporation in Broward County on June 19, 2007 with headquarters in Miramar, and offices in North Miami and South Carolina, licensed and certified to do business in the State of Florida as Professional Engineers and Professional Land Surveyors. Our state license and other applicable certifications, such as the FDOT and County prequalification are attached with our minority certifications at the end of this response. 18 RFQ No. 20-07-01 City of Sunny Isles Beach August 2020 C. Cover Letter and Executive Summary This contract will be serviced from our Headquarters located in Miramar, Broward County, Florida, not only because its our closest location to the City of Sunny Isles Beach, but also offers our widest range of resources. Our Miramar office is less that 30 minutes away any location within the City of Sunny Isles Beach. Our Headquarters staff work very closely with the Miami Office personnel, and have an integrated system, where both offices work off a single server, with remote connection, video conference capabilities and capable to share resources seamlessly. Below is a map and addresses of our locations: 19 RFQ No. 20-07-01 City of Sunny Isles Beach August 2020 C. Cover Letter and Executive Summary PDS is a relatively young firm with a bright future ahead. In its short history, PDS has been able to secure important contracts such as the Continuing Surveying Services Pool of firms with Miami-Dade County, Continuing Architectural/Engineering Services Contract in Federally Funded projects with Miami-Dade Transit, the Continuing Architectural/Engineering Services Contract projects with Broward County Transit, GIS input on all water and wastewater infrastructure assets in the City of Miami Gardens, working for the Miami-Dade Water and Sewer Department, all the utility design and coordination for the expansion of the Runway of the FLL Airport, civil engineers for the GEC contract with Broward County Aviation Division. All of these projects give stability to the company and allow for future growth. These projects were procured and are being executed with the PDS approach to help our clients no matter what. The PDS approach is to put aside profit and multipliers and focus on the big picture, bottom line and the necessities our municipalities have, and do whatever it takes to provide our services and help reach these goals. Yes, PDS is a Corporation, and not a Not-For-Profit Corporation, but we realize that as a young firm, we need to demonstrate our capabilities. We are sure that once we are given the opportunity to work in a project, our clients will call us back for more work, and that is the PDS approach. This approach that has already proven itself, as we receive most of our business from repeat clients, demonstrating the high level of satisfaction our clients receive from PDS. Our business model has also contributed to receive an award as Miami-Dade County Firm of the Year in 2019, and also as one of the top 100 minority firms in Miami, awarded by the Greater Miami Chamber of Commerce in 2012. Broward County Corporate Headquarters 12781 Miramar Pkwy, Ste 205 Miramar, FL 33027 Professional Staff: 8 Miami-Dade County North Miami Branch 1065 NW 125 Street N. Miami, FL 33161 Professional Staff: 6 York County South Carolina Branch 150 Oakland Avenue, Suite 215 Rock Hill, SC 29732 Professional Staff: 1 20 RFQ No. 20-07-01 City of Sunny Isles Beach August 2020 C. Cover Letter and Executive Summary PDS was founded in the verge of one of the worst economic depressions of recent history. However, implementing the PDS Approach, with unparalleled service and quality in our deliverables, PDS has managed to grow exponentially since its inception. Premiere Design Solutions, Inc. was founded as a Corporation by Mr. Luis Javier Jurado, P.E. in 2007 with the goal of offering exceptional service and high quality engineering services to private and government clients. Mr. Luis Jurado, P.E. (President) decided to open the business with the vision of offering cost effective engineering solutions with minimal impacts to the environment. PDS was established as a minority owned and operated firm to provide high-quality Civil Engineering, Land Development and construction management services to the private and public sectors throughout the Southeast United States. Later, PDS added Land Surveying as one of its core services to be able to provide client an integrated one stop solution to their needs. The firm's most valuable asset: our professional staff has more than 100 years of experience in consulting and engineering services that include pre-design, design, construction management, inspection, storm-water, water and wastewater, environmental compliance, land development, site remediation, feasibility studies, value engineering, permitting, land surveying and design/build projects. PDS’s board of directors drafted and executed a unique business plan that has been successful in growing the company at a pace of 100% year over year during these very hard economic times. PDS continues to evolve as a multidisciplinary consulting firm that serves public and private clients, and a broad array of markets with one goal: Provide excellent service to our clients, with high quality, reliability, honesty, respect, and integrity in doing business. PDS’ reputation for excellence in the industry remains a core value since the firm's inception. Our firm is capable of integrating all of our services and any others from sub- consultants and provide the City with a single point of contact and responsibility, to enhance communications, and will enforce our QA/QC procedures throughout the project. All deliverables will be reviewed by professional qualified staff, not related to the project, to ensure completeness and quality of submittals. We respectfully request your consideration of this proposal to provide our services to the City of Sunny Isles Beach, and request your selection of our firm to enter into a continuing contract agreement. Our firm understands that if selected, PDS is willing to meet any location, budget or task order assigned to our firm. Respectfully yours, Luis J. Jurado, P.E. President Premiere Design Solutions, Inc. Address: 1065 NE 125th St, #211B, North Miami, FL 33161 Phone: 954.237.7850 extension 701 Mail: Ljurado@pds-eng.com 21 RFQ No: 20-07-01 CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) iii. Surveyors and Mapping Category Certified Minority Business Enterprise Certifications 22 Minority Business CertificationPremiere Design Solutions07/24/2020 07/24/202223 24 25 26 Section D Project Approach and Understanding RFQ No: 20-07-01 CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) 27 RFQ No: 20-07-01 CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) i. Civil Engineers Category Project Approach and Understanding 28 RFQ No. 20-07-01 City of Sunny Isles Beach Beach August 2020 D – Project Approach and Understanding Premiere Design Solutions, Inc. (PDS) is proposing to be selected as Civil Engineering Consultants to bring our exceptional service and responsiveness, combined with our firms innovative and “out-of-the-box” solutions to work with the City of Sunny Isles Beach. At PDS we recognize that communication is one of the most important aspects of the Client-Consultant relationship. Effective communication translates to projects that deliver and exceed all of the Client’s needs, including delivering projects within City’s Budget requirements. This is why we strongly believe that it is key to a successful completion of this project to have a single point of contact. This greatly reduces the possibility of information loss and breach in communications. PDS is proposing Mr. Gustavo Eckardt, P.E. as the Project Manager and single point of contact to the City of Sunny Isles Beach to discuss all matters related to the Architectural/Engineering tasks that may derive from this project. Mr. Eckardt is a seasoned engineer with over 18 years of experience in civil and municipal engineering, developing great organizational skills with the ability of excellent communication. Mr. Eckardt has obtained numerous permits in south Florida, leader of several governmental projects completed within time and under budget. Mr. Eckardt’s experience as project manager includes projects in the City of Sunny Isles Beach such as 40-Year Certifications and Transit Bus Stop Improvements, also being Project Manager and engineer of record for the City of Miramar for the design and construction of over 72,000LF of water mains, Project Manager and engineer of record for the rehabilitation of the Master Sanitary Sewer Lift station of the City of Opa-Locka, and the Design of Transit Improvements for the City of Miami Lakes. All of these, and other projects, have been delivered on schedule and under the assigned City Budget. Our President, Mr. Luis Jurado, P.E. will be the firms Quality Control and Quality Assurance Manager, responsible to personally provide reviews checks and will oversee all of the tasks orders derived from this project, and will provide guidance to the project team, and ensure the best and adequate staffing levels are provided to the City’s various projects that fall under PDS’s scope of work at all times during our contract. 29 RFQ No. 20-07-01 City of Sunny Isles Beach Beach August 2020 D – Project Approach and Understanding Mr. Eckardt will lead a team strong in talent and technical expertise, familiar with municipal work, and used to work as a team, which has continuously worked together from our Headquarter offices in the City of Miramar, Broward County, Florida. Our team of professionals is comfortable working with government agencies, and is trained to think as an extension of the City Staff, always looking in the best interests of the City. Our team of professionals working on a specific project is not just our engineers and support staff, but our team includes the client, in this case it includes the City of Sunny Isles Beach’ project manager and others involved in the project. The City is always informed and will participate in all stages of the process, receiving guidance from our professional staff, and being able to provide important input on the project, and always aware of any budgetary impacting issues. This approach we are proposing for this project is not just a proposal. This same approach has been utilized with successful results in the past to execute other government contracts, including contracts with Miami-Dade County, FDOT District 4, Broward County Transit, City of Miami Lakes, City of Opa- Locka, Broward County Aviation Department and the Miami-Dade Water and Sewer Department. Our approach ensures that the City administration, City Engineers, PDS, contractors, consultants, and other stakeholders are a fully integrated and participate in every project. Another Key factor in our approach is Quality Assurance and Quality Control. Early in the project we engage our highly- experienced QA/QC experts, like Luis Jurado, P.E., to ensure a quality result. These experts will be available as required to offer advice during all stages of the project and will also oversee that proper resources are assigned once a project has been identified, and will review the work to make sure it meets or exceeds City requirements and standards. Our Team’s technical review process includes QA/QC, tracking procedures, value engineering, and constructability reviews. QA/QC begins with the first day of the project and continues until final acceptance of the final product. PDS has a defined quality control procedure described in the PDS Quality Control Manual, intended to minimize the risk of errors and omissions and to maximize the quality of the final product. One of our policies is to always have a qualified professional, not involved in the specific task being done, review and comment before every submittal. This ensures quality and completeness of submittals. 30 RFQ No. 20-07-01 City of Sunny Isles Beach Beach August 2020 D – Project Approach and Understanding In addition to this, we implement a flow chart process to route technical documents and plans through several iterations of reviews until the PDS quality is reached. The box to the right of the following page is a sample of a Quality Control flow chart customized for a design project PDS is working on with Broward County Transit. A similar flow chart would be developed for this project, to make sure we customize the process to make it fit the specific requirements of this project. So we have mentioned key features of our approach, including a single point of communication, seamless teamwork and a sound quality control process. But our approach includes other aspects that help ensure a successful completion of projects. Our experienced professionals will provide the City with the following: Provide single point of contact and responsibility Ensure teamwork including City staff Coordinate with City Staff Provide project management Provide design phase management Manage the schedule and control project costs Enforce Quality Assurance/Quality Control (QA/QC) Provide public communication and outreach Provide construction management support Technology offers great tools for engineering, so why not take advantage of them? As a twenty-first century company, PDS strongly believes on technological aides and advances, and is equipped with the latest technology in computer hardware and software. 31 RFQ No. 20-07-01 City of Sunny Isles Beach Beach August 2020 D – Project Approach and Understanding Our qualified individuals are able to put the technology to work in the advantage of the client. All of our computers have at least quad-core processors running the latest version of MacOS with a the latest version Microsoft Windows 10 running as a virtual environment to provide optimal compatibility when required. These high end computers are required to run our in house latest versions of design software such as AutoCAD Civil 3D with capabilities to do 3D modeling, ArcGIS 10 to create GIS models, modeling software as iCPR and HydraFLOW and our management tools as MS Projects, and Oracle Primavera P6. We also have all the printing capabilities in house, with full size 24”x36”, half size 11”x17” and high speed regular printing, enabling us to produce hard copies and deliverables for our clients, at the push of a button. Our staff managing and working on this project, will be working from our headquarters, with all of the above at their disposition, and most importantly, less than 30 minutes away from the City of Sunny Isles Beach. This would give us an excellent response time to any request the City may have. Our staff is also trained in client satisfaction, and will provide responses within 24 hours of request, and usually a lot quicker than that. Our Key staff has PDS mobile phones which are carried 24hours a day, so we will always be just a call away, any time, any day. Our responsiveness is usually highly praised by our clients, and in this, PDS is second to none. Based on our experience with similar project, PDS envisions this project to be developed as follows: Once a specific task order is initiated by the City or identified by PDS, a Scoping Meeting will be held to establish common goals, budgetary and scheduling constraints, critical success factors, and how the project fits into the City’s overall program. PDS is also very aware of the turmoil most government agencies are going through; therefore we are very conscious of the budgetary constraints of the projects. PDS usually goes above and beyond the consultant’s duties, to help the City make the project a reality, becoming a catalyst of the project. We will do just that with the City of Sunny Isles Beach. This session will typically be joined by City staff, consultants, and the PDS Team, with the purpose of creating an understanding of the project scope and commitment to the project goals, and finding the best way to take the project to a successful completion. After the scope has been established, our managing team and project engineers will each think as an extension of the City staff. In this phase, PDS will provide coordination with all stakeholders, including the Utilities Department, City departments, and other government agencies involved in a project. Staying in constant contact and communication with all applicable stakeholders ensures a project team that understands the impact of all those involved. 32 RFQ No. 20-07-01 City of Sunny Isles Beach Beach August 2020 D – Project Approach and Understanding A systematic, coordinated, and logical approach to project execution creates a collaborative effort that optimizes planning, design, construction management, and operational activities. Our management team will develop the following tasks: Develop and Define Project Intent, Scope, and Responsibilities Identify Responsible Staff and Assignments Highlight City Procedures and Standards Related to this Task Define Team Structure and Reporting Procedures Develop an Efficient Project Schedule and Tracking Mechanisms Develop Cost and Budgetary Constraints and Tracking Mechanisms Create a Regulatory Agency Tracking Sheet and Permitting Procedures Develop a Customized QA/QC Program and Enforcement Tools The completion of the coordination phase is quickly followed by the pre-design or design phase of the project, depending on the scope of the project. The PDS Team intends to bring the strongest resources to participate in this project to provide in-depth technical evaluation of designer selections, the design products, and design procedures. This will be of great benefit to City because they will receive in-depth technical opinions on which to base project decisions. The PDS Team, as an extension to the City Staff will represent the City in technical discussions with regulatory agencies, other design engineers and contractors. PDS will also schedule, arrange and conduct required meeting with stakeholders. 33 RFQ No. 20-07-01 City of Sunny Isles Beach Beach August 2020 D – Project Approach and Understanding Pre-Design and Design tasks will be initiated, enforcing all our management procedures. We will also conduct detailed design reviews throughout the pre-design and design phase. Several workshops and work sessions will be held including code reviews, inter-discipline coordination meetings, discipline QA/QC reviews, value engineering, constructability reviews, and operability reviews. During all project phases, all related documentation including surveys, technical memos, eMails, meeting minutes, reports, calculations, models, drawings, specifications, details, etc, will be managed and filed electronically and in hard copies (with the exception of eMails). All project documentation may be provided to the City periodically or upon request. Our plan includes regular coordination meetings and progress meetings to ensure and optimize City involvement. We know that the work being done under this project is not the only item of business demanding your time. Therefore, we will conduct efficient meetings using detailed and time-limited agendas. Coordination meetings will be specifically related to individual project activities to ensure input from all stakeholders and will be intended to inform operations staff about any particular outage or operational constraints that may be required during project delivery. During the detailed design phase, the City staff will provide input on materials of construction, specifics on desired equipment features; consider equipment compatibility and reliability, operating and management philosophy, automation procedures, and the like for incorporation into the design. Project control tools will be utilized, such as Primavera products for scheduling and construction management tasks. These products also allow all team members to access project data at anytime. Our project control includes control of costs and detailed projection of construction costs, to help determine budgets. Our professionals are very aware of the recent decline and later gradual increase of our construction industry prices. Our staff is in constant communication with contractors and suppliers. This is very beneficial to the City, since we will be able to provide budgetary estimates that will resemble real construction prices, avoiding over budgeting or under budgeting of construction contracts. PDS is also a strong advocate of life cycle cost analysis for determining the budgetary impact of a project, helping the City make better decisions. PDS will also provide the City, if necessary, community involvement sessions during the design phase, to obtain input from residents about certain projects. PDS has experience providing these services and aiding in public outreach campaigns. Useful tools include the creation of letters to affected residents, implementation of a project related webpage, schedule public meetings, and generate information flyers. Usually, it is up to the client the level of community involvement desired, and it varies by project, but community involvement at any level should be a part of every utility project, and PDS has the 34 RFQ No. 20-07-01 City of Sunny Isles Beach Beach August 2020 D – Project Approach and Understanding experience and capabilities to help with this Task. This task should also continue throughout the duration of the construction phase of the project. After we have developed a sound, efficient and design, we prepare a construction document set and enter the Construction Management phase. These is performed following all the City Regulations, and a complete package is prepared, including construction drawings, general and technical specifications, bid documents and forms. PDS will help the City throughout the bidding process, reviewing bids for completion, creating bid tabulations and matrixes for easy comparison, verifying reference information, making award recommendations and attending pre-bid meetings. Again, acting as an extension of the City’s Staff, PDS will always represent the city during the contractor selection process. Once a contractor is selected, PDS continues to represent the City during Pre-Construction meetings, conducting periodic inspections, generating reports and answering to any requests for information that may arise. PDS will also represent the city creating claim rebuttal documentation in the event change orders are requested, reviewing and providing timely approval of shop drawings and submittals. Final closeout and permit requirement close-out documentation will be collected and requested from contractor to completely close-out the project. PDS will also develop warranties and contact information manuals; because we believe that construction quality needs to be enforced not only throughout the construction, but also throughout the warranty period. If any warranty issue arises, the city will have a central location with all pertinent contact and warranty information to easily get the issue resolved. PDS will continue to serve the City of Sunny Isles Beach through all phases of the project, offering unparalleled responsiveness and excellent quality levels. 35 RFQ No. 20-07-01 City of Sunny Isles Beach Beach August 2020 Section VIII – Attachments & Forms Although Premiere Design Solutions, Inc. (PDS) has been delivering successful engineering projects to governmental clients since its incorporation in 2007, the experience that PDS brings to its Clients goes way beyond that. Our Project Manager for this project, Mr. Gustavo Eckardt has over 18 years of experience in Civil Engineering, and has designed, managed and permitted numerous projects in south Florida. The Key staff of the PDS Team brings over 100 years of engineering experience in planning, feasibility studies, engineering design, surveying services, permitting, facility upgrades, utility management, operation assistance, and capital improvement plans. PDS has focused on expanding and bringing onboard professionals with a keen understanding of the consultant’s role, with experience in municipal and government projects, which bring to the company a combined experience in water and wastewater design and permitting of over 120,000lf of pipeline ranging from 6-inch to 96-inch in diameter, Design of over 1,000 transit facility improvements, Pump Stations, Master lift Stations, sidewalk projects and construction management to name a few. PDS is capable of offering its clients engineering system planning from inception all the way through final design and construction support services. We utilize published literature, collected datum and statistical analysis to develop project and design criteria which meet the needs of the application. The development of appropriately technical planning documents for the engineering projects that meld with municipal planning agency documents of a broader scope, provides informative, workable solutions for all involved. The firm has developed an important strength in the local market, in the Transit Improvements and Civil Engineering fields, securing continuing engineering contracts with county agencies such as Miami-Dade Water and Sewer, Miami-Dade Transit and Broward County Transit. These projects still have about 3 years of duration with optional extensions. These projects give our firm the stability necessary for measured growth and a secured establishing in the south Florida region. 36 RFQ No. 20-07-01 City of Sunny Isles Beach Beach August 2020 Section VIII – Attachments & Forms In 2019 PDS was awarded SBE Firm of The Year by Miami-Dade County ISD and back in 2012, PDS was awarded as one of the Top Minority Firms in Miami, as awarded by the Greater Miami Chamber of Commerce. These awards are recognition to the firm’s commitment to its clients and shows how PDS was able to rise among hundreds of firms in the area to receive these awards. PDS is also usually recognized by its clients for providing very clear and complete engineering drawings, with sound constructability design, and an exceptional service. PDS is also usually recognized by its clients for providing very clear and complete engineering drawings, with sound constructability design, and an exceptional service. Our firms experience in municipal project and track record of delivering projects within City’s budget, and finding a way to take the project to a successful completion speaks for itself. Rather than further explaining our approach and experience, we would like to present the following list, showing recently completed projects for a municipality, which was competed by PDS as a prime consultant within the project schedule and budget: Pump Station Improvements – MDWASD – PDS provides on a task order basis, designs for sanitary sewer pump stations throughout Miami-Dade County for Miami-Dade Water & Sewer Department. Small Diameter Piping – MDWASD – PDS provides on a task order basis, designs for small diameter piping for the Miami-Dade Water and Sewer Department. City of Miami Gardens – General Surveying Services – PDS performs all of the surveying needs for the city of Miami Gardens on a task order basis as needed. Town of Miami Lakes - Transit Improvements at City Bus Stops – Performed Survey, Civil Engineering, Electrical Design, Structural Design and Construction Administration Miami-Dade Water & Sewer – GIS Input of all Miami Spring Assets – Performed GIS Input of all assets, digitized as-built, field location of utilities and resolution of conflicts. City of Opa-Locka – Master Sanitary Sewer Lift Station Rehabilitation - Provided Civil engineering design, electrical design, and construction management for lift station and building rehabilitation. FDOT District 4 – Transit Improvements throughout Broward County – Provided Survey, Civil, Electrical & Structural Design for improvement of 74 bus stop locations in Broward County. City of Hallandale Beach – Transit Improvements - Performed Survey, Civil Engineering, Electrical Design, Structural Design for ADA improvements at 28 locations within the City. 37 RFQ No. 20-07-01 City of Sunny Isles Beach Beach August 2020 Section VIII – Attachments & Forms As shown above, at PDS we have a track record of delivering projects within budget and ahead of schedule, providing unparalleled responsiveness and excellent communication with our clients throughout the way for an excellent project Performance. Our large list of repeat clients is proof of our performance. We encourage the City of Sunny Isles Beach to contact our project references and inquire about the PDS delivery and the level of service and quality provided. We are also including in this section project sheets with more specific information on our similar completed or ongoing projects, including all applicable project information and contact information. We are also providing a summary below of the contact information of some of our governmental clients in recent projects for your convenience. You do not have to take our word for it, please hear what our clients have to say about us and our past performance. 38 RFQ No: 20-07-01 CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) ii. Surveyors and Mapping Category Project Approach and Understanding 39 RFQ No. 20-07-01 City of Sunny Isles Beach Beach August 2020 D – Project Approach and Understanding Premiere Design Solutions, Inc. (PDS) is proposing to be selected as Professional Land Surveyors Consultants to bring our exceptional service and responsiveness, combined with our firms innovative and “out-of-the-box” solutions to work with the City of Sunny Isles Beach. At PDS we recognize that communication is one of the most important aspects of the Client-Consultant relationship. Effective communication translates to projects that deliver and exceed all of the Client’s needs, including delivering projects within City’s Budget requirements. This is why we strongly believe that it is key to a successful completion of this project to have a single point of contact. This greatly reduces the possibility of information loss and breach in communications. PDS is proposing Mr. Gustavo Eckardt, P.E. as the Project Manager and single point of contact to the City of Sunny Isles Beach to discuss all matters related to the Land Surveying Needs and required tasks that may derive from this project. Mr. Eckardt is a seasoned engineer with over 18 years of experience in civil and municipal engineering, developing great organizational skills with the ability of excellent communication and very familiar with completing topographic surveys for municipalities. Mr. Eckardt has successfully completed numerous and various types of surveys for governmental agencies including the City of Sunny Isles beach, where under Mr. Eckardt’s lead, PDS prepared numerous surveys at existing sidewalk locations for the placement of new and relocated bus shelters. Mr. Eckardt’s experience as project manager includes projects in the City of Sunny Isles Beach such as 40-Year Certifications and Transit Bus Stop Improvements, also being Project Manager and engineer of record for the City of Miramar for the design and construction of over 72,000LF of water mains, Project Manager and engineer of record for the rehabilitation of the Master Sanitary Sewer Lift station of the City of Opa- Locka, and the Design of Transit Improvements for the City of Miami Lakes. All of these, and other projects, have been delivered on schedule and under the assigned City Budget. Mr. Fernando Fernandez, PSM will is our Chief Surveyors with over 20 years of Land surveying experience, personally leads all of our field work and then ensures all data collected in the filed is accurately represented in our surveying mapping and drawings. Having Mr. Fernandez in the field with our survey crew ensures all of his knowledge and attention to detail is transcribed into our topographic or specific purpose surveys. Mr. Fernandez also personally and constantly is training our crews, making our survey staff better all the time. 40 RFQ No. 20-07-01 City of Sunny Isles Beach Beach August 2020 D – Project Approach and Understanding Our President, Mr. Luis Jurado, P.E. will be the firms Quality Control and Quality Assurance Manager, responsible to personally provide reviews checks and will oversee all of the tasks orders derived from this project, and will provide guidance to the project team, and ensure the best and adequate staffing levels are provided to the City’s various projects that fall under PDS’s scope of work at all times during our contract. Mr. Eckardt will lead a team strong in talent and technical expertise, familiar with municipal work, and used to work as a team, which has continuously worked together from our Headquarter offices in the City of Miramar, Broward County, Florida. Our team of professionals is comfortable working with government agencies, and is trained to think as an extension of the City Staff, always looking in the best interests of the City. Our team of professionals working on a specific project is not just our engineers and support staff, but our team includes the client, in this case it includes the City of Sunny Isles Beach’ project manager and others involved in the project. The City is always informed and will participate in all stages of the process, receiving guidance from our professional staff, and being able to provide important input on the project, and always aware of any budgetary impacting issues. This approach we are proposing for this project is not just a proposal. This same approach has been utilized with successful results in the past to execute other government contracts, including contracts with Miami-Dade County, City of Miami Gardens, FDOT District 4, Broward County Transit, City of Miami Lakes, City of Opa-Locka, Broward County Aviation Department and the Miami-Dade Water and Sewer Department. Our approach ensures that the City administration, City Engineers, PDS, contractors, consultants, and other stakeholders are a fully integrated and participate in every project. Another Key factor in our approach is Quality Assurance and Quality Control. Early in the project we engage our highly- experienced QA/QC experts, like Luis Jurado, P.E., to ensure a quality result. These experts will be available as required to offer advice during all stages of the project and will also oversee that proper resources are assigned once a project has been identified, and will review the work to make sure it meets or exceeds City requirements and standards. Our Team’s technical review process includes QA/QC, tracking procedures, value engineering, and constructability reviews. QA/QC begins with the first day of the project and continues until final acceptance of the final product. PDS has a defined quality control procedure described in the PDS Quality Control Manual, intended to minimize the risk of errors and omissions and to maximize the quality of the final product. One of our policies is to always have a qualified professional, not involved in the specific task being done, review and comment before every submittal. This ensures quality and completeness of submittals. 41 RFQ No. 20-07-01 City of Sunny Isles Beach Beach August 2020 D – Project Approach and Understanding In addition to this, we implement a flow chart process to route technical documents and plans through several iterations of reviews until the PDS quality is reached. The box to the right of the following page is a sample of a Quality Control flow chart customized for a design project PDS is working on with Broward County Transit. A similar flow chart would be developed for this project, to make sure we customize the process to make it fit the specific requirements of this project. So we have mentioned key features of our approach, including a single point of communication, seamless teamwork and a sound quality control process. But our approach includes other aspects that help ensure a successful completion of projects. Our experienced professionals will provide the City with the following: Provide single point of contact and responsibility Ensure teamwork including City staff Coordinate with City Staff Provide project management Provide design phase management Manage the schedule and control project costs Enforce Quality Assurance/Quality Control (QA/QC) Provide public communication and outreach Provide construction management support Technology offers great tools for engineering, so why not take advantage of them? As a twenty-first century company, PDS strongly believes on technological aides and advances, and is equipped with the latest technology in computer hardware and software. 42 RFQ No. 20-07-01 City of Sunny Isles Beach Beach August 2020 D – Project Approach and Understanding Our qualified individuals are able to put the technology to work in the advantage of the client. All of our computers have at least quad-core processors running the latest version of MacOS with a the latest version Microsoft Windows 10 running as a virtual environment to provide optimal compatibility when required. These high end computers are required to run our in house latest versions of design software such as AutoCAD Civil 3D with capabilities to do 3D modeling, ArcGIS 10 to create GIS models, modeling software as iCPR and HydraFLOW and our management tools as MS Projects, and Oracle Primavera P6. Our surveying software includes also Carlson SurvCE latest version, one of the world leaders in data collection paired with our GPS Rovers and Data collectors which are all manufactured and maintained by Carlson also. PDS also has digital total stations, digital levels, and pick-up trucks to aid in data collection tasks. We also have all the printing capabilities in house, with full size 24”x36”, half size 11”x17” and high speed regular printing, enabling us to produce hard copies and deliverables for our clients, at the push of a button. Also having digital signature capabilities to allow our clients to receive digital copies on a moment’s notice. Our staff managing and working on this project, will be working from our headquarters, with all of the above at their disposition, and most importantly, less than 30 minutes away from the City of Sunny Isles Beach. This would give us an excellent response time to any request the City may have. Our staff is also trained in client satisfaction, and will provide responses within 24 hours of request, and usually a lot quicker than that. Our Key staff has PDS mobile phones which are carried 24hours a day, so we will always be just a call away, any time, any day. Our responsiveness is usually highly praised by our clients, and in this, PDS is second to none. Based on our experience with similar project, PDS envisions this project to be developed as follows: Once a specific task order is initiated by the City or identified by PDS, a Scoping Meeting will be held to establish common goals, budgetary and scheduling constraints, critical success factors, and how the project fits into the City’s overall program. PDS is also very aware of the turmoil most government agencies are going through; therefore we are very conscious of the budgetary constraints of the projects. PDS usually goes above and beyond the consultant’s duties, to help the City make the project a reality, becoming a catalyst of the project. We will do just that with the City of Sunny Isles Beach. This session will typically be joined by City staff, consultants, and the PDS Team, with the purpose of creating an 43 RFQ No. 20-07-01 City of Sunny Isles Beach Beach August 2020 D – Project Approach and Understanding understanding of the project scope and commitment to the project goals, and finding the best way to take the project to a successful completion. One of the key aspects is to define the project area and ultimate project goals. Since our staff are also engineers, we know exactly what engineers need from surveys, as they are mostly used as a basis of engineering design or planning. After the scope has been established, our managing team and project engineers will each think as an extension of the City staff. In this phase, PDS will provide coordination with all stakeholders, including the Utilities Department, City departments, and other government agencies involved in a project. Staying in constant contact and communication with all applicable stakeholders ensures a project team that understands the impact of all those involved. A systematic, coordinated, and logical approach to project execution creates a collaborative effort that optimizes planning, design, construction management, and operational activities. Our management team will develop the following tasks: Develop and Define Project Intent, Scope, and Responsibilities Identify Responsible Staff and Assignments Highlight City Procedures and Standards Related to this Task Define Team Structure and Reporting Procedures Develop an Efficient Project Schedule and Tracking Mechanisms Develop Cost and Budgetary Constraints and Tracking Mechanisms Create a Regulatory Agency Tracking Sheet and Permitting Procedures Develop a Customized QA/QC Program and Enforcement Tools 44 RFQ No. 20-07-01 City of Sunny Isles Beach Beach August 2020 D – Project Approach and Understanding The completion of the coordination phase is quickly followed by the pre-design or design phase of the project, depending on the scope of the project. The PDS Team intends to bring the strongest resources to participate in this project to provide in-depth technical evaluation of designer selections, the design products, and design procedures. This will be of great benefit to City because they will receive in-depth technical opinions on which to base project decisions. The PDS Team, as an extension to the City Staff will represent the City in technical discussions with regulatory agencies, other design engineers and contractors. PDS will also schedule, arrange and conduct required meeting with stakeholders. Pre-Design and Design tasks will be initiated, enforcing all our management procedures. We will also conduct detailed design reviews throughout the pre-design and design phase. Several workshops and work sessions will be held including code reviews, inter-discipline coordination meetings, discipline QA/QC reviews, value engineering, constructability reviews, and operability reviews. During all project phases, all related documentation including surveys, technical memos, eMails, meeting minutes, reports, calculations, models, drawings, specifications, details, etc, will be managed and filed electronically and in hard copies (with the exception of eMails). All project documentation may be provided to the City periodically or upon request. Our plan includes regular coordination meetings and progress meetings to ensure and optimize City involvement. We know that the work being done under this project is not the only item of business demanding your time. Therefore, we will conduct efficient meetings using detailed and time-limited agendas. Coordination meetings will be specifically related to individual project activities to ensure input from all stakeholders and will be intended to inform operations staff about any particular outage or operational constraints that may be required during project delivery. During the detailed design phase, the City staff will provide input on materials of construction, specifics on desired equipment features; consider equipment compatibility and reliability, operating and management philosophy, automation procedures, and the like for incorporation into the design. Project control tools will be utilized, such as Primavera products for scheduling and construction management tasks. These products also allow all team members to access project data at anytime. Our project control includes control of costs and detailed projection of construction costs, to help determine budgets. Our professionals are very aware of the recent decline and later gradual increase of our construction industry prices. Our staff is in constant communication with contractors and suppliers. This is very beneficial to the City, since we will be able to provide budgetary estimates that will resemble real construction prices, avoiding over budgeting or under budgeting of construction contracts. 45 RFQ No. 20-07-01 City of Sunny Isles Beach Beach August 2020 D – Project Approach and Understanding Typically after the City has developed a sound, efficient and functional design, we prepare a construction document set and enter the Construction Management phase if required. These is performed following all the City Regulations, and a complete package is prepared, including construction drawings, general and technical specifications, bid documents and forms. PDS will help the City throughout the bidding process, reviewing bids for completion, creating bid tabulations and matrixes for easy comparison, verifying reference information, making award recommendations and attending pre-bid meetings. Again, acting as an extension of the City’s Staff, PDS will always represent the city during the contractor selection process. Once a contractor is selected, PDS continues to represent the City during Pre-Construction meetings, conducting periodic inspections, generating reports and answering to any requests for information that may arise. PDS will also represent the city creating claim rebuttal documentation in the event change orders are requested, reviewing and providing timely approval of shop drawings and submittals. Final closeout and permit requirement close-out documentation will be collected and requested from contractor to completely close-out the project. PDS can also develop warranties and contact information manuals; because we believe that construction quality needs to be enforced not only throughout the construction, but also throughout the warranty period. If any warranty issue arises, the city will have a central location with all pertinent contact and warranty information to easily get the issue resolved. PDS is capable of providing As-Built data collection of contractor’s work to either verify contractor’s provided as-builts or entirely prepare as-builts for the City of Sunny Isles Beach. PDS can continue to serve the City of Sunny Isles Beach through all phases of the project, offering unparalleled responsiveness and excellent quality levels. The firm has developed an important strength in the local market, in the Transit Improvements and Civil Engineering fields, securing continuing engineering contracts with county agencies such as Miami-Dade Water and Sewer, Miami-Dade Transit and Broward County Transit. These projects still have about 3 years of duration with optional extensions. These projects give our firm the stability necessary for measured growth and a secured establishing in the south Florida region. In 2019 PDS was awarded SBE Firm of The Year by Miami-Dade County ISD and back in 2012, PDS was awarded as one of the Top Minority Firms in Miami, as awarded by the Greater Miami Chamber of Commerce. These awards are recognition to the firm’s commitment to its clients and shows how PDS was able to rise among hundreds of firms in the area to receive these awards. PDS is also usually recognized by its clients for providing very clear and complete engineering drawings, with sound constructability design, and an exceptional service. 46 RFQ No. 20-07-01 City of Sunny Isles Beach Beach August 2020 D – Project Approach and Understanding PDS is also usually recognized by its clients for providing very clear and complete engineering drawings, with sound constructability design, exceptional service and very high quality land surveying documents. Our firms experience in municipal project and track record of delivering projects within City’s budget, and finding a way to take the project to a successful completion speaks for itself. Rather than further explaining our approach and experience, we would like to present the following list, showing recently completed land surveying projects, competed by PDS as a prime consultant within the project schedule and budget: Pump Station Improvements – MDWASD – PDS provides all of the land surveying needs of this contract, including surveys for existing and new pump stations for Miami-Dade Water & Sewer. Small Diameter Piping – MDWASD – PDS provides all of the land surveying needs of this contract, including Right-of-Way surveys on existing roadways for new small diameter (Less than 36”) for the Miami-Dade Water & Sewer department. City of Miami Gardens – General Surveying Services – PDS performs all of the surveying needs for the city of Miami Gardens on a task order basis as needed. Town of Miami Lakes - Transit Improvements at City Bus Stops – Performed Land Surveying for Bus Stops Throughout the City. Miami-Dade County Survey Pool – Provides surveys as needed by various department of Miami- Dade County on a task order driven basis. Miami-Dade Water & Sewer – GIS Input of all Miami Spring Assets – Performed GIS Input of all assets, digitized as-built, field location of utilities and resolution of conflicts. FDOT District 4 – Transit Improvements throughout Broward County – Provided Survey, Civil, Electrical & Structural Design for improvement of 74 bus stop locations in Broward County. City of Hallandale Beach – Transit Improvements - Performed Survey, Civil Engineering, Electrical Design, Structural Design for ADA improvements at 28 locations within the City. As shown above, at PDS we have a track record of delivering projects within budget and ahead of schedule, providing unparalleled responsiveness and excellent communication with our clients throughout the way for an excellent project Performance. Our large list of repeat clients is proof of our performance. We encourage the City of Sunny Isles Beach to contact our project references and inquire about the PDS delivery and the level of service and quality provided. 47 Section E Qualification Information and Assigned Personnel RFQ No: 20-07-01 CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) 48 RFQ No: 20-07-01 CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) i. Civil Engineers Category Form SF330 49 5. NAME OF FIRM PART I - CONTRACT-SPECIFIC QUALIFICATIONS ARCHITECT - ENGINEER QUALIFICATIONS A. CONTRACT INFORMATION 2. PUBLIC NOTICE DATE 3. SOLICITATION OR PROJECT NUMBER B. ARCHITECT-ENGINEER POINT OF CONTACT C. PROPOSED TEAM(Complete this section for the prime contractor and all key subcontractors.) 4. NAME AND TITLE 8. E-MAIL ADDRESS7. FAX NUMBER6. TELEPHONE NUMBER (Check)PRIMEJ-VPARTNERSUBCON-TRACTOR9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT a. b. c. d. e. f. STANDARD FORM 330 D. ORGANIZATIONAL CHART OF PROPOSED TEAM (Attached) CHECK IF BRANCH OFFICE CHECK IF BRANCH OFFICE CHECK IF BRANCH OFFICE CHECK IF BRANCH OFFICE CHECK IF BRANCH OFFICE CHECK IF BRANCH OFFICE AUTHORIZED FOR LOCAL REPRODUCTION 1. TITLE AND LOCATION (City and State) CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA)City of Sunny Isles Beach, Florida 07/08/2020 RFQ No: 20-07-01 Luis Jurado Premiere Design Solutions, Inc. 954 303 4101 954 337 2332 Ljurado@pds-eng.com ✘ ✘ Premiere Design Solutions, Inc. 1065 NE 125th St, #211B, North Miami, FL 33161 Prime Consultant ✘ 50 Civil Engineering QA/QC Luis Jurado, P.E. –PDS Project Controls Caridad Calvo -PDS Economic Valuations Andres Amoedo -PDS CAD Services Henry Rivera -PDS Andres Rivera -PDS Project Engineering Jason Mckoy –PDS Ana Salazar -PDS Project Manager Gustavo Eckardt, P.E. –PDS City of Sunny Isles Beach 51 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Luis J. Jurado, P.E. 13. ROLE IN THIS CONTRACT Civil Engineering QA/QC 14. YEARS EXPERIENCE a. TOTAL 17 b. WITH CURRENT FIRM 13 15. FIRM NAME AND LOCATION (City and State) Premiere Design Solutions, Inc. – North Miami, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) B.S. Civil Engineering, University of North Carolina at Charlotte 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Engineer Florida No.66396 - South Carolina No. 28394 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Florida Engineering Society, National Society of Professional Engineers, ASCE Member 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Broward County Transit – Professional Services Agreement in an Ongoing Basis, Broward County, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. Jurado was Project Manager and designed over 1,000 bus stops including but not limited to bus stops, bus shelters, bus bays, bike lanes, curb and gutter, landing pads, sidewalk connectors, new sidewalks, handicap ramps, stormwater improvements and bus shelter pads. In addition, Mr. Jurado prepared paving, grading and drainage plans to depict proper stormwater conveyance and retention as per the proposed improvements. The utility coordination for this project was very rigorous since many of the bus stops were located within high dense urban areas with reduced right-of-way space. b. (1) TITLE AND LOCATION (City and State) FDOT Minor Highway Transit Enhancements, Broward County, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION (If applicable) 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Project included design services, permitting and construction management services for the improvement at 73 locations along FDOT right-of-way in Broward County, FL. This Design-Build Project included the enhancement of transit facilities, including ADA improvements, utility coordination, civil design, permitting and construction inspections. This project also included the design of custom made state of the art bus shelter facilities to replace exiting or be added at these locations. Mr. Jurado was responsible for presenting a work program to ensure completion within the expected Client’s schedule, project team coordination and rigorous quality control. The project total cost was $2.5 Million. c. (1) TITLE AND LOCATION (City and State) FLL Westside Watermain Loop, Broward County Aviation Department, Broward County, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) 2020 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm This water main project was following the Water System Master Plan and was designed by Mr. Jurado as Engineer of Record. Project included the design, permit and Engineering support for the construction of those improvements that this area of the airport requires; consistent with the Water System Master Plan. Design included over 5,000 LF of 16 and 12-inch diameter DIP water mains, with taps, air release valves, pavement restoration including airside concrete apron restoration and all the required coordination. Mr. Jurado also led and supervised engineering during construction services including the preparation of record drawings and final project certification and closeout. d. (1) TITLE AND LOCATION (City and State) Pembroke Pines City Hall and Civic Center, City of Pembroke Pines, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (If applicable) 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. Jurado was Civil Engineer and prepared engineering drawings for this 115 Acre project development in the City of Pembroke Pines. Project delivered the City Center a mixture of residential, commercial and office facilities. The site is located within one of the busiest corridors within Broward County. The Pembroke Pines City Hall and Civic Center is currently under construction and will be located in the middle of the City Center with access to all the facilities. The site, located on 10-acres will provided the community with a City Hall and Civic Center Building, and Commission Chambers Building for public meetings and an Art Gallery Building. Construction Cost: $60M. e. (1) TITLE AND LOCATION (City and State) Taylor Lane Roadway Improvements, Dania Beach, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2014 CONSTRUCTION (If applicable) 2016 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. Jurado was the Engineer of Record for this project to provide design, permitting and engineering services during construction for the development of a drainage system to help alleviate flooding of this city roadway from stormwater run-off. The project was designed by PDS and permits were obtained from the local governmental agencies. Mr. Jurado’s design included the development of drainage improvements within the roadway and the development of a dry retention area to collect the stormwater run-off from the roadway. PDS was involved in the contractor selection, overseeing the preparation of the contract and ultimate completion of the improvements. 52 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Gustavo A. Eckardt. P.E. 13. ROLE IN THIS CONTRACT Project Manager 14. YEARS EXPERIENCE a. TOTAL 18 b. WITH CURRENT FIRM 10 15. FIRM NAME AND LOCATION (City and State) Premiere Design Solutions, Inc. – North Miami, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) B.S. Civil Engineering, University of North Carolina at Charlotte 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Engineer Florida No.67553 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Florida Engineering Society, Chi Epsilon Civil Engineering Honor Society, National Society of Professional Engineers, Primavera P3 Scheduling Training, MOT Training Course 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Hard Rock Stadium Pedestrian Bridges and Tunnels, City of Miami Gardens, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) 2020 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. Eckardt was the project manager and engineer of record for this project which the preparation of specific purpose surveys at four locations at the Hard Rock Stadium, drainage design and underground utility investigation and design. The project had a very aggressive schedule, requiring to build two pedestrian bridges and two pedestrian tunnels at the Stadium in anticipation of the Superbowl LIV. Project also included the drafting and preparation of legal description and sketches for the dedication of land and aerial easements for the new structures in private property. The project total cost is $16 Millions. b. (1) TITLE AND LOCATION (City and State) Miami-Dade Transit Department, ARRA Municipalities Shelters Groups “A & C”, Miami-Dade County, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2012 CONSTRUCTION (If applicable) 2015 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Project consisted of two transit improvement projects at over 70 locations throughout Miami-Dade County, in the Cities of Homestead, Florida City, North Miami, North Miami Beach, Miami Lakes, Surfside, Bay Harbor Islands, Aventura, South Miami, Opa-Locka, and El Portal. Project was Federally Funded and coordinated by the Miami- Dade Transit Department, and follows all ARRA and Federal guidelines and regulations. Mr. Eckardt was the Construction Manager and Quality Control representative in the project, and assisted in obtaining all permitting approvals from municipalities and county agencies. Project included the ADA accessibility and pedestrian safety improvements to bus stop locations, new bus shelters and amenities, new sidewalk and reinforced concrete pads. c. (1) TITLE AND LOCATION (City and State) MDT A/E Professional Consultant Services for Federally Funded Projects, Miami-Dade County Transit, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. Eckardt is the Consultant Project Manager in this multi-year contract for Continuous Professional Services for Federally Funded Projects, to develop transit facilities funded through the Federal Transit Administration (FTA). The scope of work includes but is not limited to: technical and operation planning, transit studies, environmental impact statements, permitting, surveying, fire/life/safety consulting, cost estimating, structural, geotechnical, industrial, electrical, MEP, architecture, transit and transportation planning in accordance with FTA requirements, design criteria, support negotiation of full funding grant agreements, plan & specification reviews, design of new transit facilities, construction engineering and inspections, value engineering, project cost estimates and traffic studies. d. (1) TITLE AND LOCATION (City and State) Miami Executive Airport RIM Taxiway Modifications, Miami-Dade Aviation Department, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (If applicable) 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. Eckardt is the project manager for this project to design modifications to the existing configuration of Taxiways “A” and “D” as they intersect and approach Runways 9L and 13 at the west terminus of the Airport. Mr. Eckardt has been responsible for design and coordination of demolition plans, new pavement design, runway and taxiway lighting design, pavement markings and signage, stormwater pollution prevention plans, construction phasing and staging, access route designation. Mr. Eckardt provided construction administration support until closeout. e. (1) TITLE AND LOCATION (City and State) FDOT Minor Highway Transit Enhancements, Broward County, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION (If applicable) 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Project included design services, permitting and construction management services for the improvement at 73 locations along FDOT right-of-way in Broward County, FL. This Design-Build Project included the enhancement of transit facilities, including ADA improvements, utility coordination, civil design, permitting and construction inspections. This project also included the design of custom made state of the art bus shelter facilities to replace exiting or be added at these locations. Mr. Eckardt was the project manager responsible for completing designs and coordinating subconsultants and prepare submittals and address permitting comments. The project total cost was $2.5 Million. 53 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Henry Rivera 13. ROLE IN THIS CONTRACT CADD Manager 14. YEARS EXPERIENCE a. TOTAL 40 b. WITH CURRENT FIRM 12 15. FIRM NAME AND LOCATION (City and State) Premiere Design Solutions, Inc. – North Miami, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) B.S. Industrial Engineering, Santander Industrial University, Bucaramanga, Colombia 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Master of Science in Industrial Engineering, University of Pittsburgh, 1978 Master of Science in Mathematical Statistics University of Chile, Santiago de Chile, Chile 1971 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Broward County Transit – Professional Services Agreement in an Ongoing Basis, Broward County, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm This project is a multi-year project consisting of designing Transit Improvements throughout Broward County that are to be compliant with ADA guidelines and regulations. One of the main objectives of the program is to provide ADA accessibility to thousands of bus stops within the County. The project includes surveying, engineering design for improvements such as landing pads, shelter pads, curb & gutter, sidewalk restoration, sidewalk transitions, etc. Mr. Rivera’s duties and responsibilities include the preparation of topographic surveys and hundredths of locations and assist with the computer generated drawings and engineering design drawings utilizing AutoCAD Civil 3D. b. (1) TITLE AND LOCATION (City and State) Sidewalk Assessment and GIS Representation, City of Fort Lauderdale, Broward County (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm This project consisted in field data collection and assessment of the existing condition of all the existing sidewalks within the City of Fort Lauderdale, which consists of over 400 miles of concrete sidewalks. Mr. Rivera was responsible for field data collection utilizing GPS devices, with picture taking capabilities, that would later sync data collected with the GIS application developed for this project. Mr. Rivera conducted staff training on new data collection devices and personally assisted in the calculation of progress utilizing GIS tools build into the GIS application. c. (1) TITLE AND LOCATION (City and State) FDOT District 4, Broward County Transit Bus Shelter Project, Broward County, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION (If applicable) 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm This Design-Build project consists of providing ADA compliant bus shelters to 73 locations throughout the cities of Wilton Manors, Oakland Park and Pompano Beach, in Broward County. Mr. Rivera was the CAD Manager on this project responsible for setting up all drawings on this project, including topographic surveys and engineering drawings. This project required the coordination between the design team consisting of civil engineers, structural engineers, electrical engineers, shelter manufacturer and our surveying team. Mr. Rivera also assisted the field crew on this project by helping in the field data collection operation to be able to meet the strict schedule requirements set by the Design-Build Team and also in the preparation of design drawing using Autcad software. d. (1) TITLE AND LOCATION (City and State) Pembroke Pines City Hall and Civic Center, City of Pembroke Pines, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (If applicable) 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. Rivera prepared all the CAD drawings for this 115 Acre project development in the City of Pembroke Pines. Project delivered the City Center a mixture of residential, commercial and office facilities. The site is located within one of the busiest corridors within Broward County. The Pembroke Pines City Hall and Civic Center is currently under construction and will be located in the middle of the City Center with access to all the facilities. The site, located on 10-acres will provided the community with a City Hall and Civic Center Building, and Commission Chambers Building for public meetings and an Art Gallery Building. Construction Cost: $60M. e. (1) TITLE AND LOCATION (City and State) Runway Incursion Mitigation (Taxiways A & D) Miami Executive Airport (TMB), Miami-Dade Aviation Department, Miami FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (If applicable) 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. Rivera was the CAD Manager in this project to mitigate the runway incursion potential. The future airport layout plan included the reconfiguration of Taxiways “A” and “D” at the entrance points to Runways 9L and 13 to eliminate the wide expansive pavement. Mr. Rivera used data points from survey to create Digital Terrain Model to be used in grading calculations in design plans. Mr. Rivera prepared grading, drainage, pavement marking and signage, staging and SWPPP plans. 54 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Jason McKoy 13. ROLE IN THIS CONTRACT Project Engineer 14. YEARS EXPERIENCE a. TOTAL 12 b. WITH CURRENT FIRM 5 15. FIRM NAME AND LOCATION (City and State) Premiere Design Solutions, Inc. – North Miami, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) Masters in Architectural Professional Studies, Leeds Metropolitan University, Leeds, UK 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Registered Architect A.R.B. UK – No. 072168l 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Btec National Diploma in Computer Graphic Design, The Sheffield College 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Hard Rock Stadium Pedestrian Bridges and Tunnels, City of Miami Gardens, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) 2020 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. McKoy assisted in this project which the preparation of drainage design and underground utility investigation and design. The project had a very aggressive schedule, requiring to build two pedestrian bridges and two pedestrian tunnels at the Stadium in anticipation of the Superbowl LIV. Project also included the drafting and preparation of legal description and sketches for the dedication of land and aerial easements for the new structures in private property. The project total cost is $16 Millions. b. (1) TITLE AND LOCATION (City and State) FLL Westside Watermain Loop, Broward County Aviation Department, Broward County, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) 2020 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm This water main project was following the Water System Master Plan and was designed by Mr. McKoy was the RPR (resident project representative) and provided full time inspections and construction administration services, including responsible of all coordination of work between different department of Miami Dade Aviation Department, FAA and the contractor. Mr. McKoy inspected installation of over 5,000 LF of 16 and 12-inch diameter DIP water mains, with taps, air release valves, asphalt pavement restoration including airside concrete apron restoration and all the required coordination. Mr. McKoy also participated in the preparation of record drawings and final project certification, punch-list and closeout. c. (1) TITLE AND LOCATION (City and State) CBIS/CBRA/BHS Program Civil Engineering at Miami International Airport, Miami-Dade Aviation Department, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm The South and Central Terminals (CBIS) / Checked Baggage Reconciliation Areas (CBRA) / Baggage Handling System (BHS) Program is a part of a $160 Million dollar program to centralize all baggage operations of these two terminals in a new modern facility. The Engineering phase, estimated at $1.6 Million included a new 4 Stories-70,000 SF building, and necessary modifications to the Central and South Terminals to accommodate the new Baggage systems. Mr. Mckoy assisted in the Construction Management for the civil component of the program. Tasks completed included the design and inspection of new water and sewer services for the building, underground utility coordination, concrete pavement design, pavement markings, signage, and maintenance of traffic. Project also included necessary civil coordination for the design and inspection of a temporary baggage make-up device requiring a 12” fire line relocation, new monitoring wells, and cleanout relocation. d. (1) TITLE AND LOCATION (City and State) Broward County Transit – Professional Services Agreement in an Ongoing Basis, Broward County, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. McKoy was Project Manager working at Broward County as in-house staff overseeing and scheduling work for the development and construction of over 1,000 bus stops including but not limited to bus stops, bus shelters, bus bays, bike lanes, curb and gutter, landing pads, sidewalk connectors, new sidewalks, handicap ramps, stormwater improvements and bus shelter pads. In addition, Mr. Jurado prepared paving, grading and drainage plans to depict proper stormwater conveyance and retention as per the proposed improvements. The utility coordination for this project was very rigorous since many of the bus stops were located within high dense urban areas with reduced right-of-way space. e. (1) TITLE AND LOCATION (City and State) North Perry Airport Park and Ride Facility, Pembroke Pines, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2014 CONSTRUCTION (If applicable) 2015 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. McKoy served as the Project Construction Manager for the development of a Park and Ride Facility at the North Perry Airport located on the northeast corner of Pembroke Road and University Drive in the City of Pembroke Pines. The site development included the design of the parking facility including a drainage and lighting system to serve riders of the Broward County Transit System, and a reconfiguration of the parking lot. Mr. McKoy was responsible for the coordination of permitting with the local governmental agencies and overseeing construction of this facility for Broward County Transit and the City of Pembroke Pines. Project was fast track and required expedited completion to secure federal funds. 55 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 1 21. TITLE AND LOCATION (City and State) Pembroke Pines City Hall and Civic Center, City of Pembroke Pines, FL , 22. YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (If applicable) 2019 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER The City of Pembroke Pines b. POINT OF CONTACT NAME Matthew Larson c.POINT OF CONTACT TELEPHONE NUMBER 954-434-5252 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Premiere Design Solutions, Inc. (2) FIRM LOCATION (City and State) Miramar, FL (3) ROLE Professional Engineering and Permitting Services b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The Pembroke Pines City Center is a 115-acre development that is currently under construction in the City of Pembroke Pines. Upon completion, the City Center will have a mixture of residential, commercial and office facilities. The site is located within one of the busiest corridors within Broward County. The Pembroke Pines City Hall and Civic Center is currently under construction and will be located in the middle of the City Center with access to all the facilities. The site, located on 10-acres will provide the community with a City Hall and Civic Center Building, and Commission Chambers Building for public meetings and an Art Gallery Building. Construction Cost: $60M. Premiere Design Solutions Staff’s role in the project is: Lead Civil Engineer and Project Manager for the on-site and off-site pavement, drainage, potable water and sanitary sewer systems. Assisted with the preparation of the Site Plan for the site for approval with the City of Pembroke Pines staff and Commission. Obtained on-site and off-site permits with Pembroke Pines Engineering, South Broward Drainage District, South Florida Water Management District, Broward County Health Department and Broward County Environmental Resource Management. Provided overall 115-acre City Center design, permitting and construction oversight. Services performed by PDS staff: Professional Site Civil Engineering Regulatory Agency permitting Construction engineering inspections 56 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 2 21. TITLE AND LOCATION (City and State) A/E Professional Consultant Services for Federally Funded Projects 22. YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (If applicable) N/A 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER Miami-Dade Transit b. POINT OF CONTACT NAME Jesus Valderrama c. POINT OF CONTACT TELEPHONE NUMBER 786-469-5291 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Premiere Design Solutions, Inc. (2) FIRM LOCATION (City and State) North Miami, FL (3) ROLE Transit Planning, ROW Support, GIS, Inspections, Design & Surveying b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Premiere Design Solutions, Inc. (PDS) currently serves as the Prime Consulting Firm for Miami-Dade Transit (MDT). MDT is the 14th largest public transit system in the USA, and the largest transit agency in the state of Florida. MDT operates a transportation system which consists of four major components: the Metrobus fleet, connecting most areas of Miami-Dade County; Metrorail, an electrically-powered, elevated, rapid-transit heavy rail system stretching 24.6 miles; Metromover, a 4.4-mile elevated people mover that serves the downtown central business district of Miami; Special Transportation Service (STS), designed to meet the needs of people with disabilities unable to use regular transit services. Overall, MDT moves over 353,000 daily (weekday) boardings on Metrobus, Metrorail, Metromover and STS combined. PDS is the prime consultant on this multi-year contract for Continuous Professional Services for Federally Funded Projects, to develop transit facilities funded through the Federal Transit Administration (FTA). The scope of work includes but is not limited to: technical and operation planning, transit studies, environmental impact statements, permitting, surveying, fire/life/safety consulting, cost estimating, structural, geotechnical, industrial, electrical, systems and mechanical engineering, architecture, transit and transportation planning in accordance with FTA requirements, design criteria, support negotiation of full funding grant agreements, plan & specification reviews, design of new transit facilities, construction engineering and inspections, value engineering, project cost estimates and traffic studies. Premiere Design Solution’s Completed Work Orders Under this Contract Included: •Construction Contracts & Procurement Support Services – Included Buy America Interpretation for Construction Contracts; An internal audit to procurement files to ensure FTA requirements are being met; & Change Order Drafting support services in compliance with FTA. •Existing Lease Management & Transit Oriented Development Support Services – Support to ROW Division to Manage leases on existing transit properties and support to new private transit oriented developments. •Independent Peer Review for Pedestrian Overpass – Design Review of a Steel Pedestrian Bridge over US-1 at University Metrorail Station. •Central Bus Garage Roofing Repairs and Bathroom Renovations – Condition Assessment, Design and Construction Support services for roofing and Bathroom improvements •SR 836 Express Planning Support – Planning services for the update of the Categorical Exclusion document, traffic analysis for the impact associated with the new terminal at FIU and Intersection analysis for the implementation of Traffic Signal Priority and Queue Jumps. •Bus Service and Design Standards – Planning support for the development of MDT Bus Service standards, creating service classes, and the development of Design drawings for MDT standard stops and facilities. Project also includes the generation of a series of Transit maps in GIS system. •Park and Ride at SW 344 Street and the Busway – Performed periodic inspection, construction management and Special inspector as required by the City of Florida City. 57 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 3 21. TITLE AND LOCATION (City and State) Hard Rock Stadium Pedestrian Bridges and Tunnels, City of Miami Gardens, Florida. 22. YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) 2020 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Miami Gardens. b. POINT OF CONTACT NAME Brenton Daily, P.E. Bentley Architects + Engineers, Inc. – Prime Consultant. c. POINT OF CONTACT TELEPHONE NUMBER (407) 331-6116 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Premiere Design Solutions, Inc. (2) FIRM LOCATION (City and State) North Miami, FL. (3) ROLE Civil Engineering and Surveying Services b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The City of Miami Gardens has engaged a Design/Build firm to design, permit and construct pedestrian improvements at the Hard Rock Stadium in the City of Miami Gardens, which shall be complete prior to a big event scheduled for February 2, 2020, with a total project cost of $16,000,000. Proposed pedestrian prefabricated metal bridge, fully enclosed with galvanized mesh, with minimum clearance of 17.5’, a span of approximately 145’, height of 15’ and 15’ of inside clear width, with concrete ramps and steps to provide ingress and egress to proposed pedestrian overpass. Proposed ramps and steps will be constructed in private land, which access to the public will be uninterrupted, open 24 hours a day and an easement granted to the City of Miami Gardens to place proposed ramps in public land. Premiere Design Solutions Staff’s Task in the project is: Topographic Survey Easement Preparation and Coordination Stormwater Management Design Permitting Utility Design and Coordination. 58 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 4 21. TITLE AND LOCATION (City and State) Various Roadway Intersection Surveys 22. YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) N/A 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Fort Lauderdale b. POINT OF CONTACT NAME Victor Herrera, PE c. POINT OF CONTACT TELEPHONE NUMBER 786-412-4447 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Premiere Design Solutions, Inc. (2) FIRM LOCATION (City and State) North Miami, FL (3) ROLE GIS, Condition Assessment & Surveying b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The City of Fort Lauderdale is committed to being a fully connected city of tomorrow by 2035. This can only be achieved by providing safe, convenient, accessible, and comfortable connections. The 2013 Neighbor Survey results indicated that 52% of residents are satisfied with the availability of sidewalks in the City. Additionally, 29% of the residents responded that the maintenance of streets, sidewalks and infrastructure should receive the most emphasis from City leaders over the next two years. As part of the comprehensive effort to address resident’s concerns, the City has embarked on a citywide Sidewalk Assessment Program, utilizing a continuing services consultant contract with Atkins. Work performed under the consultant task order included a GIS inventory of all 420 miles of City-owned sidewalks and an interactive report with sidewalk deficiency, photo and GIS location, type, and length of damage. Premiere Design Solution’s role in the project: Equipment Coordination and Staff Training Project Scheduling and performance tracking Existing sidewalk condition assessment using GPS and Camera Equipped data collectors Assessment included ADA deficiencies and condition verification QA/QC of data collected and Coordinated re-assessment of data as required Premiere Design Solutions, Inc (PDS) served as a sub-consultant to ATKINS on this program and was responsible for providing all of the filed inspection and sidewalk condition assessment of the 420 miles of city sidewalks. Work included the coordination and training of field staff in the use of project equipment, such as the Trimble Geo 7 Series and the criteria dictated by the client in the categorization, prioritization and levels required by the project. Assessment included the identification of ADA non-conformances, unsafe sidewalks, cracks and damages. PDS also provided scheduling and coordination of field crews conducting the condition assessment in order to meet the client’s delivery schedule. Data collected was uploaded to the Clients Server for report generation. PDS also conducted Quality Control on data collected, reports and images, and conducted verification of flagged areas. 59 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 5 21. TITLE AND LOCATION (City and State) CBIS/CBRA/BHS Program Civil Engineering, Miami, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) 2019 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER Miami-Dade Aviation Department b. POINT OF CONTACT NAME Ricardo Solorzano c. POINT OF CONTACT TELEPHONE NUMBER 305-876-7809 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Premiere Design Solutions, Inc. (2) FIRM LOCATION (City and State) North Miami, FL. (3) ROLE Civil Engineering Services & Surveying Services b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The CBIS/CBRA/BHS at Miami International Airport (MIA), procured by the Miami-Dade Aviation Department consists of modifications to the South and Central Terminals Checked Baggage Inspection Systems (CBIS) / Checked Baggage Reconciliation Areas (CBRA) / and Baggage Handling System (BHS). The program is part of a $150 Million dollar program to centralize and upgrade all baggage operations of these two terminals into a new modern facility for screening, transporting and new baggage handling equipment at the Miami International Airport, one of the busiest airports in the United States and the World. The Engineering phase, included a new 4 Stories-70,000 SF building, located between Concourses G and H with a pedestrian connector between these two concourses, and all the necessary modifications to the Central and South Terminals to accommodate the new Baggage Handling equipment and systems. Premiere Design Solutions, Inc. (PDS) was responsible for the Civil Engineering component of the program and trough PDS’ participation and constant coordination, project was completed within the anticipated delivery schedule. Premiere Design Solution’s role in the project is: Engineering Design of new water and sewer connections for proposed building Surveying Support Services Civil and underground utilities demolition and underground utility relocation coordination Stormwater Management system design and modifications Fuel Line Abandonment plans Rigid Pavement demolition and restoration design Pavement Marking and Signage Design Maintenance of Vehicular and Tug Drive Traffic Fire line Relocation design (12” DIP Water Main) Monitoring Well Relocation Support Civil design services for Temporary Make-up Baggage devices Permitting Coordination Construction Management and Engineering during construction services. 60 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 6 21. TITLE AND LOCATION (City and State) West Side Water Main Loop, Fort Lauderdale, Fl. 22. YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) 2020 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER Broward County Aviation Department (BCAD) b. POINT OF CONTACT NAME Alex Lazowick – President – Keith & Associates c. POINT OF CONTACT TELEPHONE NUMBER 954-788-3400 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Premiere Design Solutions, Inc. (2) FIRM LOCATION (City and State) Miramar, FL. (3) ROLE Civil Engineering, Permitting, Construction Management b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The Project is generally described as follows: design, permitting, bidding and construction phase services for the installation of 16 and 12 inch water main loop that will loop the west, north and east sides of the expanded lease parcels that are south of Taxiway C west and north of Lee Wagner Boulevard. This water main upgrade is required in accordance with the Water System Master Plan prepared by EAC Consulting, Inc. This project included the design, permitting and full time Engineering support for the construction of those improvements that this area of the airport required. This project is also known as phase two of the West Water Main, being an extension of a recently installed phase one West Water Main improvements to the South of this project. The Scope of work of this project includes the following task: Coordination with County and Government to expedite the project. Design and Permitting of the water main system. Utility locating services to meet local system criteria Provide Engineering Services during construction to certify the completion of the project Premiere Design Solutions Staff’s role in the project is: General civil engineering services. Obtaining Engineering Permits for the project. Bidding and awards services. Construction Management and Engineering during construction services. Full time inspections Project Closeout and record drawing preparation 61 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 7 21. TITLE AND LOCATION (City and State) Runway Incursion Mitigation (Taxiways A & D) Miami Executive Airport (TMB), Miami Fl. 22. YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (If applicable) 2019 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER Miami-Dade Aviation Department b. POINT OF CONTACT NAME Alejandro Montalvo c.POINT OF CONTACT TELEPHONE NUMBER (305) 876-7513 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Premiere Design Solutions, Inc. (2) FIRM LOCATION (City and State) North Miami, FL. (3) ROLE Civil Engineering and Surveying Services b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The project site is within the Miami Executive Airport (TMB), formerly known as the Kendall-Tamiami Airport owned and maintained by the Miami-Dade Aviation Department (MDAD), on the northwest corner of the airfield at the approach ends of Runways 9L and 13. The scope of work involved the preparation of plans and specifications necessary to modify TMB Taxiways “A” and “D” wide expansive pavement to a reduced width size to accommodate Airplane Design Group (ADG) III aircraft. This project is in response to FAA’s identifying this segment of the airfield under the FAA Runway Incursion Mitigation (RIM) Program. Airfield geometry has been identified as a primary contributing factor for runway incursion in this case. To address these existing issues, the FAA has initiated a comprehensive multi-year RIM program to identify, prioritize, and develop strategies to help airport sponsors mitigate risk at these locations. PDS was the Prime Consultant on this project to mitigate the runway incursion potential. The future airport layout plan includes the reconfiguration of Taxiways “A” and “D” at the entrance points to Runways 9L and 13 to eliminate the wide expansive pavement. The proposed reconfiguration coordinated and agreed to between the Air Traffic Control (ATC) and MDAD Operations, reduces the overall width while also decoupling these two taxiways. This would, however warrant the need to construct a new connector taxiway and adjacent holding bay but these features are not part of this project. This work includes the reduction of taxiway pavement widths, connection to Runways 9L and 13 and related work. Premiere Design Solution’s role in the project was: Topographic Survey Civil Engineering and Stormwater Management measures Pavement design, demolition and reconfiguration SWPPP and SWPP Report Existing lighting modifications and proposed taxiway and runway lighting design Construction Phasing Coordination and Staging area determination General site configuration and modifications Estimate of Construction Cost Construction Management and Inspections 62 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 8 21. TITLE AND LOCATION (City and State) Broward County Transit – Professional Services Agreement in an Ongoing Basis, Broward County, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) 2019 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER Broward County Transit b. POINT OF CONTACT NAME Arethia Douglas, P.E. c. POINT OF CONTACT TELEPHONE NUMBER 954-357-8375 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Premiere Design Solutions, Inc. (2) FIRM LOCATION (City and State) North Miami, FL (3) ROLE Civil Design, Permitting & Surveying b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Premiere Design Solutions, Inc (PDS) served as the prime consultant responsible for providing professional engineering, surveying and permitting services to the Broward County Transit Department (BCTD) for ADA improvements for transit facilities and new bus shelters at thousands of locations throughout Broward County, Florida. PDS’s responsibilities for this project included preparation of surveys, site condition assessments, geotechnical investigations, civil engineering design, structural engineering design, landscape design, electrical and photometric design, permit preparation and processing, modification of permits acquired by the BCTD, maintenance of traffic plans, utility relocations coordination and construction management. The PDS professional staff designed over 1,000 bus stops including but not limited to bus stops, bus shelters, bus bays, bike lanes, curb and gutter, landing pads, sidewalk connectors, new sidewalks, handicap ramps, stormwater improvements and bus shelter pads. In addition, PDS prepared paving, grading and drainage plans to depict proper stormwater conveyance and retention as per the proposed improvements. The utility coordination for this project was very rigorous since many of the bus stops were located within high dense urban areas with reduced right-of-way space. In order to accommodate the proposed improvements, PDS successfully relocated or coordinated relocations of many utilities including potable water, wastewater, electrical, traffic, power, telecommunications, and others. 63 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 9 21. TITLE AND LOCATION (City and State) FDOT Minor Highway Transit Enhancements, Broward County, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION (If applicable) 2013 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER FDOT District 4 b. POINT OF CONTACT NAME Scott Peterson, P.E. c. POINT OF CONTACT TELEPHONE NUMBER 954-777-4416 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Premiere Design Solutions, Inc. (2) FIRM LOCATION (City and State) Weston, FL (3) ROLE Planning, Civil Engineering, Permitting, Surveying & Construction Support b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The FDOT Bus Shelter project is a project consisting of providing ADA compliant Bus Shelters and Transit Improvements to 73 locations throughout the cities of Wilton Manors, Oakland Park and Pompano Beach, all located in Broward County, FL while ensuring the conditions of the existing and proposed bus stops to be compliant with ADA guidelines and regulations. Premiere Design Solutions, Inc. (PDS) was the prime Planner and Designer in this 2.5 Million Design Build Project. The project scope included planning, civil, structural and electrical engineering design for the bus shelters to be installed at the current locations, as well as improvements at bus stops such as landing pads, curb & gutter, drainage improvements, utility coordination, sidewalk restoration, sidewalk transitions, and amenities such as benches, trash cans, solar panels, etc. PDS was also responsible for all utility coordination for this project and coordinated the design team consisting of civil engineers, structural engineers, electrical engineers and a surveying team. Duties included scheduling, permitting and quality control review prior to submittal, meeting with governmental agencies having jurisdiction over the project site location to discuss permitting requirements and issues. Project also included topographic surveys and As-Bults of completed improvements. 64 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 10 21. TITLE AND LOCATION (City and State) Taylor Lane Roadway Improvements, Dania Beach, Fl. 22. YEAR COMPLETED PROFESSIONAL SERVICES 2014 CONSTRUCTION (If applicable) 2016 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Dania Beach b. POINT OF CONTACT NAME Ronnie Navarro, PE. c.POINT OF CONTACT TELEPHONE NUMBER 954-924-6808 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Premiere Design Solutions, Inc. (2) FIRM LOCATION (City and State) North Miami, FL. (3) ROLE Site Engineering – Water and Sewer b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Taylor Lane is a 2,000 linear foot section of roadway located in the City of Dania Beach adjacent to the Fort Lauderdale Hollywood International Airport and the Dania Cut-Off Canal and associated Marinas. As part of the development of the south runway extension at the airport, stormwater run-off was re- directed and has adversely impacted Taylor Lane. This roadway provides the only access to the marinas located on the north side of Dania Cut Off Canal west of US 1. PDS provided design, permitting and engineering services during construction for the development of a drainage system to help alleviate flooding of this roadway from stormwater run-off. The project was designed by PDS and permits were obtained from the local governmental agencies. The PDS design included the development of drainage improvements within the roadway and the development of a dry retention area to collect the stormwater run-off from the roadway. PDS was involved in the contractor selection, overseeing the preparation of the contract and ultimate completion of the improvements. The scope of work of this project includes the following task: Coordination with County and Government to expedite the project Design and Permitting of the drainage system to help alleviate roadway flooding Design of the Drainage System to meet local drainage criteria Pavement Marking and Signage Design Provide Engineering Services during construction to certify the completion of the project Premiere Design Solutions Staff’s role in the project is: General civil engineering services, including Paving and Drainage Infrastructure improve- ments, stormwater management and grading design. Obtaining Engineering Permits for the project Construction Management and Engineering during construction services. 65 G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 1 2 3 4 5 6 7 8 9 10 STANDARD FORM 330 26. NAMES OF KEY PERSONNEL (From Section E, Block 12) 27. ROLE IN THIS CONTRACT (From Section E, Block 13)123 4 5 6 7 8 9 10 29. EXAMPLE PROJECTS KEY NO.TITLE OF EXAMPLE PROJECT (FROM SECTION F)NO.TITLE OF EXAMPLE PROJECT (FROM SECTION F) 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in "Example Projects Key" section below before completingtable. Place "X" under project key number for participation in same or similar role.) Luis J. Jurado, P.E. Civil Engineering QA/QC ✘✘✘✘✘✘✘✘✘✘ Gustavo A. Eckardt. P.E. Project Manager ✘✘✘✘✘✘✘✘ ✘ Henry Rivera CADD Manager ✘✘✘✘✘✘✘✘✘ ✘ Jason McKoy Project Engineer ✘✘✘✘✘✘✘✘ Pembroke Pines City Hall and Civic Center, 2015 A/E Professional Consultant Services for Federally Funded Projects, 2015 Hard Rock Stadium Pedestrian Bridges and Tunnels, 2019 Various Roadway Intersection Surveys, 2019 CBIS/CBRA/BHS Program Civil Engineering, 2016 West Side Water Main Loop, 2018 Runway Incursion Mitigation (Taxiways A & D), 2017 Broward County Transit – Professional Services Agreement, 2016 FDOT Minor Highway Transit Enhancements, 2010 Taylor Lane Roadway Improvements, 2014 66 H. ADDITIONAL INFORMATION 30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED. I. AUTHORIZED REPRESENTATIVE 31. SIGNATURE 32. DATE 33. NAME AND TITLE STANDARD FORM 330 The foregoing is a statement of facts. 08/18/2020 Luis J. Jurado President 67 STANDARD FORM 330 ARCHITECT-ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (If any) PART II - GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (OR BRANCH OFFICE) NAME Premiere Design Solutions, Inc. 3. YEAR ESTABLISHED 2007 TIN:26-0571068 DUNS:938410813 2b. STREET 1065 NE 125 Street, Suite 211B 5. OWNERSHIP a. TYPE S Corporation 2c. CITY North Miami 2d. STATE FL 2e. ZIP CODE 33161 b. SMALL BUSINESS STATUS 8 (a), DBE , SBE , CBE, MBE, SBA 6a. POINT OF CONTACT NAME AND TITLE Luis Jurado- President 7. NAME OF FIRM (If block 2a is a branch office) Premiere Design Solutions, Inc.6b. TELEPHONE NUMBER 954.303.4101 6c. E-MAIL ADDRESS Ljurado@pds-eng.com 8a. FORMER FIRM NAME(S) (If any) 8b. YR. ESTABLISHED 8c. UNIQUE ENTITY ID N/A N/A N/A 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM’S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function Code b. Discipline c. No. of Employees a. Profile Code b. Experience c. Revenue Index Number (see below) (1) FIRM (2) BRANCH 02 Administrative 1 1 A06 Airports; 3 06 Architect 1 A12 Automation; Controls; Instrumentation 07 Biologist C15 Construction Management 2 08 CADD Technician 1 C18 Cost Estimating 10 Chemical Engineer D08 Dredging Studies and Design 12 Civil Engineer 1 E09 Environmental Impact Studies, etc. 14 Computer Programmer E11 Environmental Planning 15 Construction Inspector E13 Environmental Testing and Analysis 16 Construction Manager 1 G04 GIS Services 1 18 Cost Engineer / Estimator H01 Harbors, piers, Ship Terminals 22 Electronics Engineer H07 Highways, Street, Parking lots 2 23 Environmental Engineer R04 Recreation Facilities 29 GIS Specialist 1 S04 Sewage Collection, Treatment, etc. 2 35 Industrial Engineer S07 Solid Wastes; Incineration; Landfill 38 Land Surveyor S13 Storm Water Handling & Facilities 2 39 Landscape Architect U01 Unexploded Ordnance Remediation 48 Project Manager 1 T02 Testing and Inspection Services 2 57 Structural Engineer T04 Topographic Surveying and Mapping 3 60 Transportation Engineer 1 W03 Water Supply; Treatment, etc. 1 62 Water Resources Engineer 1 Development Other Employees Information Technology Total 7 11 Management Consulting 1 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) PROFESSIONAL SERVICES REVENUE INDEX NUMBER 1. Less than $100,000 2. $100,000 to less than $250,000 3. $250,000 to less than $500,000 4. $500,000 to less than $1 million 5. $1 million to less than $2 million 6. $2 million to less than $5 million 7. $5 million to less than $10 million 8. $10 million to less than $25 million 9. $25 million to less than $50 million 10. $50 million or greater a. Federal Work 1 b. Non-Federal Work 5 c. Total Work 5 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. a. SIGNATURE b. DATE 08/18/2020 c. NAME AND TITLE Luis Jurado – President 4.UNIQUE ENTITY ID 1 1 1 1 22 1 2 1 2 2 2 Request for Qualifications No. 20-07-01 68 RFQ No: 20-07-01 CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) ii. Surveyors and Mapping Category Form SF330 69 5. NAME OF FIRM PART I - CONTRACT-SPECIFIC QUALIFICATIONS ARCHITECT - ENGINEER QUALIFICATIONS A. CONTRACT INFORMATION 2. PUBLIC NOTICE DATE 3. SOLICITATION OR PROJECT NUMBER B. ARCHITECT-ENGINEER POINT OF CONTACT C. PROPOSED TEAM(Complete this section for the prime contractor and all key subcontractors.) 4. NAME AND TITLE 8. E-MAIL ADDRESS7. FAX NUMBER6. TELEPHONE NUMBER (Check)PRIMEJ-VPARTNERSUBCON-TRACTOR9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT a. b. c. d. e. f. STANDARD FORM 330 D. ORGANIZATIONAL CHART OF PROPOSED TEAM (Attached) CHECK IF BRANCH OFFICE CHECK IF BRANCH OFFICE CHECK IF BRANCH OFFICE CHECK IF BRANCH OFFICE CHECK IF BRANCH OFFICE CHECK IF BRANCH OFFICE AUTHORIZED FOR LOCAL REPRODUCTION 1. TITLE AND LOCATION (City and State) CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) 07/08/2020 RFQ No: 20-07-01 Luis Jurado Premiere Design Solutions, Inc. 954 303 4101 954 337 2332 Ljurado@pds-eng.com ✘ ✘ Premiere Design Solutions, Inc. 1065 NE 125th St, #211B, North Miami, FL 33161 Prime Consultant ✘ City of Sunny Isles Beach, Florida 70 Survey Principal / QA/QC Luis Jurado, P.E. –PDSProject Manager Gustavo Eckardt, P.E. –PDS Surveying Crew 1 Leader Jorge M. Olmo –PDS Chief Surveyor Fernando Fernandez PSM –PDS Henry Rivera –PDS Surveying Crew 2 Leader City of Sunny Isles Beach 71 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Fernando Fernandez. PSM 13. ROLE IN THIS CONTRACT Chief Surveyor 14. YEARS EXPERIENCE a. TOTAL 25 b. WITH CURRENT FIRM 8 15. FIRM NAME AND LOCATION (City and State) Premiere Design Solutions, Inc. – North Miami, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) B.S. Hydrology Engineering, Alma-Alta, Former USSR 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Land Surveyor & Mapper LS No. 6765 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Hard Rock Stadium Pedestrian Bridges and Tunnels, City of Miami Gardens, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) 2020 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. Fernandez was the Survey Party Chief for the preparation of specific purpose surveys at four locations at the Hard Rock Stadium, for a very aggressive schedule project to build two pedestrian bridges and two pedestrian tunnels at the Stadium in anticipation of the Superbowl LIV. Project also included the drafting and preparation of legal description and sketches for the dedication of land and aerial easements for the new structures in private property. The project total cost is $16 Millions. b. (1) TITLE AND LOCATION (City and State) Roadway Segment Surveying Services for DCP, City of Miami, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. Fernandez was Chief Surveyor responsible to provide over 15,000 LF of roadway surveys from Right-of-way (ROW) to ROW on city street segments, including all above ground features, elevations cross sections at every 100’, collection of all above ground features within survey area, including information for sanitary sewer and drainage structures such as bottom, invert, size and direction. Mr. Fernandez scheduled the crews, and performed QA/QC reviews of survey drawings and provided signed and sealed drawings of survey. c. (1) TITLE AND LOCATION (City and State) Various Roadway Intersections Surveys, Miami-Dade County, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm This project was to provide roadway intersection improvements at five different roadway intersections throughout Miami-Dade County. Mr. Fernandez was tasked with the topographic surveys which required the completion of five separated Specific Purpose Surveys with a very aggressive schedule. Each location included all visible relevant topographic features along the proposed site area, Right-Of-Way research and preparation, plat research and the submittal drawing was required to follow standards provided by the Client, including layers, line weights, colors, symbols, etc, as required by Miami-Dade County. Mr. Fernandez led the field crew in the data collection and was responsible for the generation of survey drawing deliverables d. (1) TITLE AND LOCATION (City and State) City-Wide Roadway Topographic Surveys for CIP Projects, City of Opa-Locka, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. Fernandez was the Chief Surveyor in this project to conduct City-wide surveys on 200,000 LF of roadways as part of the CIP program to improve water and sewer infrastructure and provide additional stormwater management, with a very aggressive completion schedule. This project has been performed by Mr. Fernandez with the latest GPS equipment and data collectors, coordinating field crews and office drafting work to meet the very demanding client schedule of completion. Surveys include ROW to ROW above ground features, drainage and wastewater structure information, drainage and sewer structure information, delineation of plats and generating survey drawings. e. (1) TITLE AND LOCATION (City and State) Biscayne Landing Engineering and Surveying Support, North Miami, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (If applicable) 2020 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. Fernandez is the Survey Crew Party Chief in this project to provide development support to the Owner. Project included the determination of volume of crushed concrete material stockpiled at the Biscayne Landings construction site and volume of lakes to be filled. Mr. Fernandez coordinated survey crews to obtain horizontal and vertical data of the location and elevation of the stockpiled material and lake soundings. With the information of the points collected in the field utilizing cross sections no longer than 25’, information was migrated into AutoCAD Civil 3D to generate a Digital Terrain Model (DTM) with the information collected from the field, generating surfaces for the existing ground and for the surface area of each of the five stock pile mounds located at the construction site. The DTM was used to determine the volume between the two surfaces, and to generate cross sections of the stock piles at constant intervals. Volume calculation plans and reports were created with plan view, cross sections and volume calculation data. 72 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Luis J. Jurado, P.E. 13. ROLE IN THIS CONTRACT Survey Principal / QA/QC 14. YEARS EXPERIENCE a. TOTAL 17 b. WITH CURRENT FIRM 13 15. FIRM NAME AND LOCATION (City and State) Premiere Design Solutions, Inc. – North Miami, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) B.S. Civil Engineering, University of North Carolina at Charlotte 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Engineer Florida No.66396 - South Carolina No. 28394 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Florida Engineering Society, National Society of Professional Engineers, ASCE Member 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Broward County Transit – Professional Services Agreement in an Ongoing Basis, Broward County, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm The Transit Infrastructure & Shelter Improvement at Bus Stops is a multi-year project consisting of improving transit facilities throughout Broward County. The scope of work for this project can be subdivided into ADA Improvements at Bus Stops, Bus Shelter Expansion Program, Bus Bay Enhancements and Transit Terminal Improvements. For these projects, Mr. Jurado has served as project director and Engineer of Record for most of the work provided under this contract including land surveying, conducted site condition assessments, engineering design, and permitting coordination for sidewalk repair and improvements projects at over 1,000 locations throughout Broward County, including ADA compliant pedestrian curb ramps, new bus shelter site design maintaining proper sight triangle, ADA Accessibility and pedestrian safety. b. (1) TITLE AND LOCATION (City and State) FDOT Minor Highway Transit Enhancements, Broward County, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION (If applicable) 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Project included design services, permitting and construction management services for the improvement at 73 locations along FDOT right-of-way in Broward County, FL. This Design-Build Project included the enhancement of transit facilities, including ADA improvements, utility coordination, civil design, permitting and construction inspections. This project also included the design of custom made state of the art bus shelter facilities to replace exiting or be added at these locations. Mr. Jurado was responsible for presenting a work program to ensure completion within the expected Client’s schedule, project team coordination and rigorous quality control. The project total cost was $2.5 Million. c. (1) TITLE AND LOCATION (City and State) Citywide Sidewalk Assessment Survey, City of Fort Lauderdale, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2014 CONSTRUCTION (If applicable) 2015 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm As part of the comprehensive effort to address resident’s concerns, the City has embarked on a citywide Sidewalk Assessment Program. The work included a GIS inventory of all 420 miles of City-owned sidewalks and an interactive report with sidewalk deficiency, photo and GIS location, type, and length of damage. Mr. Jurado was responsible for the coordination of work, training and field data collection of filed survey activities, and assisted field crews in the collection of data and assessing the existing condition of miles of existing sidewalks and pedestrian curb ramps. d. (1) TITLE AND LOCATION (City and State) City-Wide Roadway Topographic Surveys for CIP Projects, City of Opa-Locka, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. Jurado was the Project Principal for this surveying project to conduct City-wide surveys on 200,000 LF of roadways as part of the CIP program to improve water and sewer infrastructure and provide additional stormwater management. This project has been performed with the latest GPS equipment and data collectors, coordinating field crews and office drafting work to meet the very demanding client schedule of completion. Surveys include ROW to ROW above ground features, drainage and wastewater structure information, delineation of plats and generating survey drawings. Mr. Jurado coordinated deliverables with client and conducted deliverable QA/QC reviews of project deliverables and coordinated comment resolution from client and owner. e. (1) TITLE AND LOCATION (City and State) GIS Services for Miami Springs Infrastructure for MDWASD, Miami-Dade Water and Sewer, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2011 CONSTRUCTION (If applicable) 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. Jurado was the Project Coordinator for implementation of the Department’s GIS system for water and sewer infrastructure, with the priority of Miami Springs acquired utilities. To achieve this, Mr. Eckardt oversaw six GIS Specialists working at WASD entering water and sewer information into the WASD GIS System with GAMS and EAMS. Project also includes field data collection and as-built plans research to collect all the required information necessary for the input of all water and sewer infrastructure in Miami Springs. 73 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Gustavo A. Eckardt. P.E. 13. ROLE IN THIS CONTRACT Project Manager 14. YEARS EXPERIENCE a. TOTAL 18 b. WITH CURRENT FIRM 10 15. FIRM NAME AND LOCATION (City and State) Premiere Design Solutions, Inc. – North Miami, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) B.S. Civil Engineering, University of North Carolina at Charlotte 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Engineer Florida No.67553 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Florida Engineering Society, Chi Epsilon Civil Engineering Honor Society, National Society of Professional Engineers, Primavera P3 Scheduling Training, MOT Training Course 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Hard Rock Stadium Pedestrian Bridges and Tunnels, City of Miami Gardens, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) 2020 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. Eckardt was the project manager and engineer of record for this project which the preparation of specific purpose surveys at four locations at the Hard Rock Stadium, drainage design and underground utility investigation and design. The project had a very aggressive schedule, requiring to build two pedestrian bridges and two pedestrian tunnels at the Stadium in anticipation of the Superbowl LIV. Project also included the drafting and preparation of legal description and sketches for the dedication of land and aerial easements for the new structures in private property. The project total cost is $16 Millions. b. (1) TITLE AND LOCATION (City and State) Roadway Segment Surveying Services for DCP, City of Miami, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. Eckardt was the Project Manager for the preparation of over 15,000 LF of roadway surveys from Right-of-way (ROW) to ROW on city of Miami 30 independent street segments, including collection of all above ground features, elevations cross sections at every 100’, including information for sanitary sewer and drainage structures such as bottom, invert, size and direction. Mr. Eckardt coordinated with client delivery schedules and assigned survey crews to meet the aggressive schedule. Mr. Eckardt also conducted QA/QC reviews of deliverables and coordinated the resolution of client comments and requests on survey drawings. c. (1) TITLE AND LOCATION (City and State) Broward County Transit – Professional Services Agreement in an Ongoing Basis, Broward County, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm The Transit Infrastructure & Shelter Improvement at Bus Stops is a multi-year project consisting of improving transit facilities throughout Broward County. The scope of work for this project can be subdivided into ADA Improvements at Bus Stops, Bus Shelter Expansion Program, Bus Bay Enhancements and Transit Terminal Improvements. For these projects, Mr. Eckardt has provided surveying coordination, site condition assessments, engineering support, design and permitting coordination for sidewalk repair and improvements projects at over 1,000 locations, including ADA compliant pedestrian curb ramps, new bus shelter site design maintaining proper sight triangle, ADA Accessibility and pedestrian safety. d. (1) TITLE AND LOCATION (City and State) City-Wide Roadway Topographic Surveys for CIP Projects, City of Opa-Locka, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. Eckardt was the Project Manager for this surveying project to conduct City-wide surveys on 200,000 LF of roadways as part of the CIP program to improve water and sewer infrastructure and provide additional stormwater management. This project has been performed with the latest GPS equipment and data collectors, coordinating field crews and office drafting work to meet the very demanding client schedule of completion. Surveys include ROW to ROW above ground features, drainage and wastewater structure information, delineation of plats and generating survey drawings. Mr. Eckardt has been responsible for coordinating field crew schedule and ensure completion dates are met as required by client. e. (1) TITLE AND LOCATION (City and State) GIS Services for Miami Springs Infrastructure for MDWASD, Miami-Dade Water and Sewer, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2011 CONSTRUCTION (If applicable) 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. Eckardt was the Project Manager for implementation of the Department’s GIS system for water and sewer infrastructure, with the priority of Miami Springs acquired utilities. To achieve this, Mr. Eckardt oversaw six GIS Specialists working at WASD entering water and sewer information into the WASD GIS System with GAMS and EAMS. Project also includes field data collection and as-built plans research to collect all the required information necessary for the input of all water and sewer infrastructure in Miami Springs. 74 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Jorge Michel Olmo 13. ROLE IN THIS CONTRACT Chief Surveyor 14. YEARS EXPERIENCE a. TOTAL 20 b. WITH CURRENT FIRM 7 15. FIRM NAME AND LOCATION (City and State) Premiere Design Solutions, Inc. – North Miami, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) B.A. Architecture, Central University of Villa Clara, Cuba 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Specialized Computer Aided Design & Drafting, Autodesk Technical Institute, Malaga, Spain 2010 Online Web Courses – Implementing New CAD Techniques (Tips and Shortcuts / Last Versions) 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Hard Rock Stadium Pedestrian Bridges and Tunnels, City of Miami Gardens, Florida. (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) 2020 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. Olmo was Survey crew lead for the preparation of specific purpose surveys at four locations at the Hard Rock Stadium, for a very aggressive schedule project to build two pedestrian bridges and two pedestrian tunnels at the Stadium in anticipation of the Superbowl LIV. Mr. Olmo collected above ground and aerial features for the project area and included utility information such as manhole inverts, above ground signs, valves, ground cover, elevations, etc The project total cost is $16 Millions. b. (1) TITLE AND LOCATION (City and State) Sidewalk Assessment and GIS Representation, City of Fort Lauderdale, Broward County (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm This project consisted in field data collection and assessment of the existing condition of all the existing sidewalks within the City of Fort Lauderdale, which consists of over 400 miles of concrete sidewalks. Mr. Olmo was responsible for field data collection utilizing GPS devices, with picture taking capabilities, that would later sync data collected with the GIS application developed for this project. Mr. Olmo assisted in the calculation of progress utilizing GIS tools build into the GIS application. c. (1) TITLE AND LOCATION (City and State) Roadway Segment Surveying Services for DCP, City of Miami, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. Olmo was Crew Party Chief responsible to collect field data of over 15,000 LF of roadway surveys from Right-of-way (ROW) to ROW on city street segments, including all above ground features, elevations cross sections at every 100’, collection of all above ground features within survey area, including information for sanitary sewer and drainage structures such as bottom, invert, size and direction. Mr. Olmo led his crews to collect data necessary for developing survey drawings including elevations to develop a digital terrain model of all street segments and created and set baselines along all of the 3o roadway segments surveyed and included in this project. d. (1) TITLE AND LOCATION (City and State) City-Wide Roadway Topographic Surveys for CIP Projects, City of Opa-Locka, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm This project includes the topographic route surveys for over 200,000 LF of roadway to receive water and sewer improvements as part of the Capital Improvements Program (CIP) throughout the City of Opa-Locka. PDS is part of the Team to provide design criteria packages for the letting of this work. Mr. Olmo was the crew lead to collect all the invert elevations, direction and bottom elevations of all drainage structures and sanitary sewer structures within the project. Mr. Olmo was also responsible for locating lot corners and establishing property lines and right of way lines based on plat records and available information. Mr. Olmo also assisted in collecting all above ground features, elevations and commanding a second crew as needed to meet project schedules. e. (1) TITLE AND LOCATION (City and State) Various Roadway Intersections Surveys, Miami-Dade County, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm This project was to provide roadway intersection improvements at five different roadway intersections throughout Miami-Dade County. Mr. Olmo was tasked with collecting field data and drafting the topographic surveys which required the completion of five separated Specific Purpose Surveys with a very aggressive schedule. Each location included all visible relevant topographic features along the proposed site area, Right-Of-Way research and preparation, plat research and the submittal drawing was required to follow standards provided by the Client, including layers, line weights, colors, symbols, as required. 75 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Henry Rivera 13. ROLE IN THIS CONTRACT Survey Crew / CAD Manager 14. YEARS EXPERIENCE a. TOTAL 40 b. WITH CURRENT FIRM 12 15. FIRM NAME AND LOCATION (City and State) Premiere Design Solutions, Inc. – North Miami, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) B.S. Industrial Engineering, Santander Industrial University, Bucaramanga, Colombia 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Master of Science in Industrial Engineering, University of Pittsburgh, 1978 Master of Science in Mathematical Statistics University of Chile, Santiago de Chile, Chile 1971 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Broward County Transit – Professional Services Agreement in an Ongoing Basis, Broward County, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm This project is a multi-year project consisting of designing Transit Improvements throughout Broward County that are to be compliant with ADA guidelines and regulations. One of the main objectives of the program is to provide ADA accessibility to thousands of bus stops within the County. The project includes surveying, engineering design for improvements such as landing pads, shelter pads, curb & gutter, sidewalk restoration, sidewalk transitions, etc. Mr. Rivera’s duties and responsibilities include the preparation of topographic surveys and hundredths of locations and assist with the computer generated drawings and engineering design drawings utilizing AutoCAD Civil 3D. b. (1) TITLE AND LOCATION (City and State) Sidewalk Assessment and GIS Representation, City of Fort Lauderdale, Broward County (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm This project consisted in field data collection and assessment of the existing condition of all the existing sidewalks within the City of Fort Lauderdale, which consists of over 400 miles of concrete sidewalks. Mr. Rivera was responsible for field data collection utilizing GPS devices, with picture taking capabilities, that would later sync data collected with the GIS application developed for this project. Mr. Rivera conducted staff training on new data collection devices and personally assisted in the calculation of progress utilizing GIS tools build into the GIS application. c. (1) TITLE AND LOCATION (City and State) FDOT District 4, Broward County Transit Bus Shelter Project, Broward County, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION (If applicable) 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm This Design-Build project consists of providing ADA compliant bus shelters to 73 locations throughout the cities of Wilton Manors, Oakland Park and Pompano Beach, in Broward County. Mr. Rivera was the CAD Manager on this project responsible for setting up all drawings on this project, including topographic surveys and engineering drawings. This project required the coordination between the design team consisting of civil engineers, structural engineers, electrical engineers, shelter manufacturer and our surveying team. Mr. Rivera also assisted the field crew on this project by helping in the field data collection operation to be able to meet the strict schedule requirements set by the Design-Build Team. d. (1) TITLE AND LOCATION (City and State) City-Wide Roadway Topographic Surveys for CIP Projects, City of Opa-Locka, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm This project included the topographic route surveys for over 200,000 LF of roadway to receive water and sewer improvements as part of the Capital Improvements Program (CIP) throughout the City of Opa-Locka. Mr. Rivera assisted in field data collection as survey crew member, and later on the drafting of collected data and the production of survey drawings, representing all ROW data, property information, above ground features, manholes and elevations. e. (1) TITLE AND LOCATION (City and State) Various Roadway Intersections Surveys, Miami-Dade County, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm This project was to provide roadway intersection improvements at five different roadway intersections throughout Miami-Dade County. Mr. Rivera was tasked with collecting field data and drafting the topographic surveys which required the completion of five separated Specific Purpose Surveys with a very aggressive schedule. Each location included all visible relevant topographic features along the proposed site area, Right-Of-Way research and preparation, plat research and the submittal drawing was required to follow standards provided by the Client, including layers, line weights, colors, symbols, as required. 76 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 1 21. TITLE AND LOCATION (City and State) CIP Citywide Topographic ROW Surveys 22. YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (If applicable) N/A 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Opa-Locka b. POINT OF CONTACT NAME Carlos Gonzalez c. POINT OF CONTACT TELEPHONE NUMBER 305-206-0279 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Premiere Design Solutions, Inc. (2) FIRM LOCATION (City and State) Weston, FL (3) ROLE Surveying b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Premiere Design Solutions, Inc. (PDS) served as the Design Criteria Package Topographic Surveyor for the City of Opa-Locka and their Capital Improvement Plan, to bring water, wastewater and stormwater improvements throughout the City. Survey work included the collection of all above ground features, topographic elevation cross sections, research and placement of monument, Right of Way, Easement and Center Lines, draft plats, and generate layered assets in AutoCAD software to represent field data collected. This project included the topographic route surveys for over 200,000 LF of roadway to receive water and sewer improvements as part of the Capital Improvements Program (CIP) throughout the City of Opa-Locka, and requires PDS to complete all surveys with a very aggressive schedule, in order to meet scheduled deadlines and limited funding. PDS participation on this project nearly saved the City half the budget destined to surveying, while being able to meet the aggressive schedule. PDS crews utilized state of the art, and the latest model of GPS rover and Data Collectors available in the market, to deliver high quality data at production speeds. Project was completed within schedule and under budget. Premiere Design Solution’s role in the project is: Plat research and drafting for ROW verification. Field Data Collection with GPS units Open all Manholes and Catch Basins to provide client with invert pipe information Cross sectional elevations from ROW to ROW of roadway to generate topographic cross sections Prepare key map and citywide survey drawings Obtain topographic data of horizontal and vertical location of all above ground features Identified easements available in county property records Coordination between City, Engineering Consultant and Survey Field Crews 77 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 2 21. TITLE AND LOCATION (City and State) Biscayne Landing DTM, Engineering and Surveying Support 22. YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (If applicable) 2020 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER Swerdlow Development b. POINT OF CONTACT NAME Darryl Lee, P.E., LEED AP c. POINT OF CONTACT TELEPHONE NUMBER 305-442-6531 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Premiere Design Solutions, Inc. (2) FIRM LOCATION (City and State) North Miami, FL (3) ROLE Engineering During Construction, Permitting & Surveying b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Premiere Design Solutions, Inc. (PDS) serves as part of the Engineering and Surveying team for this project which includes the design and construction administration of site grading work and new spine road throughout the site. PDS tasks include the permitting assistance, engineering inspections and filed data collection, computer drafting, digital terrain modeling (DTM), topographic survey, volume calculations and report preparation including cross sections of crushed concrete stock piles and existing lake volumes. PDS was contracted to determine the volume of crushed concrete material stockpiled at the Biscayne Landings construction site and volume of lakes to be filled. PDS coordinated in-house survey crew to obtain horizontal and vertical data of the location and elevation of the stockpiled material and lake soundings. With the information of the points collected in the field utilizing cross sections no longer than 25’, information was migrated into AutoCAD Civil 3D to generate a Digital Terrain Model (DTM) with the information collected from the field, generating surfaces for the existing ground and for the surface area of each of the five stock pile mounds located at the construction site. The DTM was used to determine the volume between the two surfaces, and to generate cross sections of the stock piles at constant intervals. Volume calculation plans and reports were created with plan view, cross sections and volume calculation data. Findings from our volume determination were used to determine payment quantities and to determine production rate adequacy by the owner. It was found that the Volume stock piled was considerably less than expected, so production of crushed concrete will have to increase to reach projected targets. Our services saved allowed our client to perform this task on budget and on schedule. This project was completed within the aggressive schedule required by the owner. 78 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 3 21. TITLE AND LOCATION (City and State) Hard Rock Stadium Pedestrian Bridges and Tunnels, City of Miami Gardens, Florida. 22. YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) 2020 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Miami Gardens. b. POINT OF CONTACT NAME Brenton Daily, P.E. Bentley Architects + Engineers, Inc. – Prime Consultant. c. POINT OF CONTACT TELEPHONE NUMBER (407) 331-6116 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Premiere Design Solutions, Inc. (2) FIRM LOCATION (City and State) North Miami, FL. (3) ROLE Civil Engineering and Surveying Services b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The City of Miami Gardens has engaged a Design/Build firm to design, permit and construct pedestrian improvements at the Hard Rock Stadium in the City of Miami Gardens, which shall be complete prior to a big event scheduled for February 2, 2020, with a total project cost of $16,000,000. Proposed pedestrian prefabricated metal bridge, fully enclosed with galvanized mesh, with minimum clearance of 17.5’, a span of approximately 145’, height of 15’ and 15’ of inside clear width, with concrete ramps and steps to provide ingress and egress to proposed pedestrian overpass. Proposed ramps and steps will be constructed in private land, which access to the public will be uninterrupted, open 24 hours a day and an easement granted to the City of Miami Gardens to place proposed ramps in public land. Premiere Design Solutions Staff’s Task in the project is: Topographic Survey Easement Preparation and Coordination Stormwater Management Design Permitting Utility Design and Coordination. 79 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 4 21. TITLE AND LOCATION (City and State) Various Roadway Intersection Surveys 22. YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) N/A 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Fort Lauderdale b. POINT OF CONTACT NAME Victor Herrera, PE c. POINT OF CONTACT TELEPHONE NUMBER 786-412-4447 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Premiere Design Solutions, Inc. (2) FIRM LOCATION (City and State) North Miami, FL (3) ROLE GIS, Condition Assessment & Surveying b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The City of Fort Lauderdale is committed to being a fully connected city of tomorrow by 2035. This can only be achieved by providing safe, convenient, accessible, and comfortable connections. The 2013 Neighbor Survey results indicated that 52% of residents are satisfied with the availability of sidewalks in the City. Additionally, 29% of the residents responded that the maintenance of streets, sidewalks and infrastructure should receive the most emphasis from City leaders over the next two years. As part of the comprehensive effort to address resident’s concerns, the City has embarked on a citywide Sidewalk Assessment Program, utilizing a continuing services consultant contract with Atkins. Work performed under the consultant task order included a GIS inventory of all 420 miles of City-owned sidewalks and an interactive report with sidewalk deficiency, photo and GIS location, type, and length of damage. Premiere Design Solution’s role in the project: Equipment Coordination and Staff Training Project Scheduling and performance tracking Existing sidewalk condition assessment using GPS and Camera Equipped data collectors Assessment included ADA deficiencies and condition verification QA/QC of data collected and Coordinated re-assessment of data as required Premiere Design Solutions, Inc (PDS) served as a sub-consultant to ATKINS on this program and was responsible for providing all of the filed inspection and sidewalk condition assessment of the 420 miles of city sidewalks. Work included the coordination and training of field staff in the use of project equipment, such as the Trimble Geo 7 Series and the criteria dictated by the client in the categorization, prioritization and levels required by the project. Assessment included the identification of ADA non-conformances, unsafe sidewalks, cracks and damages. PDS also provided scheduling and coordination of field crews conducting the condition assessment in order to meet the client’s delivery schedule. Data collected was uploaded to the Clients Server for report generation. PDS also conducted Quality Control on data collected, reports and images, and conducted verification of flagged areas. 80 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 5 21. TITLE AND LOCATION (City and State) Various Roadway Intersection Surveys 22. YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) N/A 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER Miami-Dade County b. POINT OF CONTACT NAME Luis Lacau c. POINT OF CONTACT TELEPHONE NUMBER 305-375-5774 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Premiere Design Solutions, Inc. (2) FIRM LOCATION (City and State) North Miami, FL (3) ROLE Land Surveying b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Premiere Design Solutions, Inc. (PDS) served as the Topographic Surveyor Consultant for Miami-Dade County under the Miami-Dade County Surveying Pool contract for the completion of the surveying portion of this project. The project intent was to provide roadway intersection improvements at five different roadway intersections. PDS was tasked with the topographic surveys required for the project, which required the completion of five separated Specific Purpose Surveys, one for each intersection, but each had to include all visible relevant topographic features along the proposed site area, Right-Of-Way research and preparation, plat research and the submittal drawing was required to follow standards provided by the Client, including layers, line weights, colors, symbols, etc, as required by Miami-Dade County. The project had a very aggressive timeline to meet scheduling requirements, and PDS utilized multiple crews to be able to finalize the topographic surveys within 30 days of work order notice, and worked at risk prior to obtaining final approvals to be able to complete the project in time. Locations Surveyed included: Location Name: 2258 – Coral Way and SW 2 Av Location Name: 2731 – Jefferson Av and 16 St Location Name: 2111 – NE 4 Ct and NE 61 St Location Name: 2488 – NW 22 Av & NW 62 St Location Name: 2768 – Pennsylvania Av and 14 St PDS completed the following scope at each location: 1.Established centerlines of rights of way, based on existing Plats 2.Showed right of way lines as per Public Records for the project area 3.Established physical control baseline using the center lines of the right of ways 4.Established a site benchmark in NGVD 1929 elevation datum 5.Located all topographic data for approximately 50 beyond the PC’s 6.All drainage structures including the size, pipes inverts, elevations and sizes 7.Located all existing mast arm including lengths, height and sizes 8.Elevation Cross section data every 25’ 9.Data delivered in state plane coordinates and aerial photographs 10.Signed and sealed Topographic Survey in a Scale of 1” = 20’ 11.Located all overhead wires and ground clearance at the Max. sag point. 12.Digital Cad drawing submittal prepared in 2014 Auto Cad version 81 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 6 21. TITLE AND LOCATION (City and State) Roadway Segment Surveying Services for DCP, City of Miami, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) N/A 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Miami b. POINT OF CONTACT NAME Richard Burgess, P.E. c. POINT OF CONTACT TELEPHONE NUMBER 305-670-2350 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Premiere Design Solutions, Inc. (2) FIRM LOCATION (City and State) North Miami, FL (3) ROLE Survey b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The City of Miami is preparing Design Criteria Packages (DCP) for a project to provide roadway, pavement and drainage improvements at 30 roadway segments throughout the City. Premiere Design Solutions (PDS) has been selected, as a subconsultant to BCC Engineering, to provide all of the Land Surveying and Topographic surveys required for this project. The scope of work included over 15,000 LF of roadway surveys from Right-of-way (ROW) to ROW on city street segments, including all above ground features, elevations cross sections at every 100’, collection of all above ground features within survey area, including information for sanitary sewer and drainage structures such as bottom, invert, size and direction. Surveys where drafted in AutoCAD format, including all collected data, baselines for roadway segments under the supervision of a Florida Registered Land Surveyor. Above ground utilities and structures: pull boxes, curbs, poles, overhead lines, water meters, mailboxes, parking meters, decorative pavement, pavers, driveways, etc. Elevation cross sections along the corridor at every 100’ intervals including Crown of road, edge of pavement, front of walk, back of walk, driveways and ramps, and center of swale up to 5' beyond right-of-way where possible. House address numbers, per Miami-Dade County property appraiser parcel information Lot Lines, roadway centerline and right-of-way lines (per plat records), Bearings and dimensions and right-of-way widths. Survey included elevations and delineation of visible areas of ponding. Rim/invert elevations pipe sizes and directions of all drainage structures within the Survey Limits. Location of trees identifying the type and trunk diameter. Point data and TIN Surface was be provided for Digital Terrain Model (DTM). Baselines where created and shown in surveys with individual numbering. Elevations were referenced to the City of Miami Datum. Project Horizontal Datum was referenced to NAD 83/2011. Side street surveys extended 100 feet past radius returns. 82 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 7 21. TITLE AND LOCATION (City and State) GIS Services for Miami Springs Infrastructure for MDWASD 22. YEAR COMPLETED PROFESSIONAL SERVICES 2011 CONSTRUCTION (If applicable) 2013 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER Miami-Dade Water & Sewer b. POINT OF CONTACT NAME Jose Lopez c. POINT OF CONTACT TELEPHONE NUMBER 786-552-8334 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Premiere Design Solutions, Inc. (2) FIRM LOCATION (City and State) North Miami, FL (3) ROLE GIS Services, Field Data Collection b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The Miami-Dade Water and Sewer Department (WASD) is one of the largest public utilities in the United States having more than 7,700 miles of underground water lines. On the wastewater side, there are about 6,200 miles of sewer lines. WASD provides service to over 2.4 million customers. Approximately 330 million gallons of water are drawn every day from the Biscayne Aquifer for consumer use with a service area of about 396 square miles and 14 potable water pump stations and about 1,000 sewer pump stations. In 2008, the entire water and sewer infrastructure serving Miami Springs was transferred to the Miami-Dade Water and Sewer Department, adding to the system an area of about 80 Million SF with 4,000 costumers, representing about 90,000 Gals of water usage per quarter. PDS worked with WASD to provide support services for implementation of the Department’s GIS system for water and sewer infrastructure, with the priority of Miami Springs acquired utilities. To achieve this, PDS had six GIS Specialists working at WASD entering water and sewer information into the WASD GIS System with GAMS and EAMS. Project also includes field data collection and as-built plans research to collect all the required information necessary for the input of all water and sewer infrastructure in Miami Springs. This project will allow Miami Springs Infrastructure to be added to the system and in the end, help with new system installations and to rapidly pinpoint the location of equipment that requires repair or upgrading, as well as to more quickly identify the facilities associated with and properties affected by outages, water leaks and other service problems or emergencies. Premiere Design Solutions Staff’s role in the project is: •Use ArcGIS 10 custom program to enter new projects into the GIS layers •Use Arc GIS 10 to research reported problems with GIS and/or as-builts and correct them •Use ArcGIS 10 and/or custom ESRI AML program to validate and modify GIS layers •Read water/wastewater as-builts to investigate and resolve potential inconsistencies in the data •Run and interpret error reports and perform QA/QC on GIS input data •Perform visual, tabular, and geographic checks on GIS layers •Field collection and research of additional information •Communicate with County personnel to resolve issues with and Maintain GIS data 83 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 8 21. TITLE AND LOCATION (City and State) Broward County Transit – Professional Services Agreement in an Ongoing Basis, Broward County, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) 2019 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER Broward County Transit b. POINT OF CONTACT NAME Arethia Douglas, P.E. c. POINT OF CONTACT TELEPHONE NUMBER 954-357-8375 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Premiere Design Solutions, Inc. (2) FIRM LOCATION (City and State) North Miami, FL (3) ROLE Civil Design, Permitting & Surveying b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Premiere Design Solutions, Inc (PDS) served as the prime consultant responsible for providing professional engineering, surveying and permitting services to the Broward County Transit Department (BCTD) for ADA improvements for transit facilities and new bus shelters at thousands of locations throughout Broward County, Florida. PDS’s responsibilities for this project included preparation of surveys, site condition assessments, geotechnical investigations, civil engineering design, structural engineering design, landscape design, electrical and photometric design, permit preparation and processing, modification of permits acquired by the BCTD, maintenance of traffic plans, utility relocations coordination and construction management. The PDS professional staff designed over 1,000 bus stops including but not limited to bus stops, bus shelters, bus bays, bike lanes, curb and gutter, landing pads, sidewalk connectors, new sidewalks, handicap ramps, stormwater improvements and bus shelter pads. In addition, PDS prepared paving, grading and drainage plans to depict proper stormwater conveyance and retention as per the proposed improvements. The utility coordination for this project was very rigorous since many of the bus stops were located within high dense urban areas with reduced right-of-way space. In order to accommodate the proposed improvements, PDS successfully relocated or coordinated relocations of many utilities including potable water, wastewater, electrical, traffic, power, telecommunications, and others. 84 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 9 21. TITLE AND LOCATION (City and State) FDOT Minor Highway Transit Enhancements, Broward County, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION (If applicable) 2013 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER FDOT District 4 b. POINT OF CONTACT NAME Scott Peterson, P.E. c. POINT OF CONTACT TELEPHONE NUMBER 954-777-4416 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Premiere Design Solutions, Inc. (2) FIRM LOCATION (City and State) Weston, FL (3) ROLE Planning, Civil Engineering, Permitting, Surveying & Construction Support b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The FDOT Bus Shelter project is a project consisting of providing ADA compliant Bus Shelters and Transit Improvements to 73 locations throughout the cities of Wilton Manors, Oakland Park and Pompano Beach, all located in Broward County, FL while ensuring the conditions of the existing and proposed bus stops to be compliant with ADA guidelines and regulations. Premiere Design Solutions, Inc. (PDS) was the prime Planner and Designer in this 2.5 Million Design Build Project. The project scope included planning, civil, structural and electrical engineering design for the bus shelters to be installed at the current locations, as well as improvements at bus stops such as landing pads, curb & gutter, drainage improvements, utility coordination, sidewalk restoration, sidewalk transitions, and amenities such as benches, trash cans, solar panels, etc. PDS was also responsible for all utility coordination for this project and coordinated the design team consisting of civil engineers, structural engineers, electrical engineers and a surveying team. Duties included scheduling, permitting and quality control review prior to submittal, meeting with governmental agencies having jurisdiction over the project site location to discuss permitting requirements and issues. Project also included topographic surveys and As-Bults of completed improvements. 85 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 10 21. TITLE AND LOCATION (City and State) Bus Stop Improvements – City of Hallandale Beach 22. YEAR COMPLETED PROFESSIONAL SERVICES 2011 CONSTRUCTION (If applicable) 2012 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Hallandale Beach b. POINT OF CONTACT NAME Tony Gonzalez, P.E. c. POINT OF CONTACT TELEPHONE NUMBER 954-457-1385 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Premiere Design Solutions, Inc. (2) FIRM LOCATION (City and State) North Miami, FL (3) ROLE Civil Design & Surveying b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Premiere Design Solutions, Inc (PDS) served as the prime consultant responsible for providing professional engineering, surveying and permitting services to the City of Hallandale Beach for ADA improvements at 26 bus stop locations within the City of Hallandale Beach. PDS’s responsibilities for this project included preparation of surveys, geotechnical investigations, civil engineering design, permit preparation and processing, modification of permits acquired by the BCTD (Broward County Transit Department) and construction management. The PDS professional staff designed over 1,220 linear feet of 6” thick concrete sidewalk, which included, but was not limited to modifying or adding new landing pads, connectors and handicap ramps. In addition, PDS prepared all of the Topographic Surveys for this project and prepared paving, grading and drainage plans to depict proper stormwater conveyance and retention as per the proposed improvements, which led to the inclusion of 4 FDOT approved Mitered Ends. The utility coordination for this project was very rigorous since many of the bus stops are located within high dense urban areas with reduced right-of-way space. PDS completed and followed closely the permitting process, going through the different agencies having jurisdiction over the area, incorporating the different standards and regulations that each agency required. 86 G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 1 2 3 4 5 6 7 8 9 10 STANDARD FORM 330 26. NAMES OF KEY PERSONNEL (From Section E, Block 12) 27. ROLE IN THIS CONTRACT (From Section E, Block 13)123 4 5 6 7 8 9 10 29. EXAMPLE PROJECTS KEY NO.TITLE OF EXAMPLE PROJECT (FROM SECTION F)NO.TITLE OF EXAMPLE PROJECT (FROM SECTION F) 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in "Example Projects Key" section below before completingtable. Place "X" under project key number for participation in same or similar role.) Fernando Fernandez. PSM Chief Surveyor ✘✘✘✘✘ ✘ Luis J. Jurado, P.E. Survey Principal / QA/QC ✘✘✘✘✘✘✘✘✘✘ Gustavo A. Eckardt. P.E. Project Manager ✘✘✘✘✘✘✘✘✘ ✘ Jorge Michel Olmo Chief Surveyor ✘✘✘✘✘ ✘ Henry Rivera Survey Crew/CAD Man. ✘✘✘✘✘✘ ✘✘✘ ✘ CIP Citywide Topographic ROW Surveys, 2015 Biscayne Landing DTM, Engineering and Surveying Support, 2015 Hard Rock Stadium Pedestrian Bridges and Tunnels, 2019 Various Roadway Intersection Surveys, City of Fort Lauderdale, 2019 Various Roadway Intersection Surveys, Miami-Dade County, 2019 Roadway Segment Surveying Services for DCP, 2020 GIS Services for Miami Springs Infrastructure for MDWASD, 2011 Broward County Transit – Professional Services Agreement, 2016 FDOT Minor Highway Transit Enhancements, 2010 Bus Stop Improvements, 2011 87 H. ADDITIONAL INFORMATION 30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED. I. AUTHORIZED REPRESENTATIVE 31. SIGNATURE 32. DATE 33. NAME AND TITLE STANDARD FORM 330 The foregoing is a statement of facts. 08/18/2020 Luis J. Jurado President 88 STANDARD FORM 330 ARCHITECT-ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (If any) PART II - GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (OR BRANCH OFFICE) NAME Premiere Design Solutions, Inc. 3. YEAR ESTABLISHED 2007 TIN:26-0571068 DUNS:938410813 2b. STREET 1065 NE 125 Street, Suite 211B 5. OWNERSHIP a. TYPE S Corporation 2c. CITY North Miami 2d. STATE FL 2e. ZIP CODE 33161 b. SMALL BUSINESS STATUS 8 (a), DBE , SBE , CBE, MBE, SBA 6a. POINT OF CONTACT NAME AND TITLE Luis Jurado- President 7. NAME OF FIRM (If block 2a is a branch office) Premiere Design Solutions, Inc.6b. TELEPHONE NUMBER 954.303.4101 6c. E-MAIL ADDRESS Ljurado@pds-eng.com 8a. FORMER FIRM NAME(S) (If any) 8b. YR. ESTABLISHED 8c. UNIQUE ENTITY ID N/A N/A N/A 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM’S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function Code b. Discipline c. No. of Employees a. Profile Code b. Experience c. Revenue Index Number (see below) (1) FIRM (2) BRANCH 02 Administrative 1 1 A06 Airports; 3 06 Architect 1 A12 Automation; Controls; Instrumentation 07 Biologist C15 Construction Management 2 08 CADD Technician 1 C18 Cost Estimating 10 Chemical Engineer D08 Dredging Studies and Design 12 Civil Engineer 1 E09 Environmental Impact Studies, etc. 14 Computer Programmer E11 Environmental Planning 15 Construction Inspector E13 Environmental Testing and Analysis 16 Construction Manager 1 G04 GIS Services 1 18 Cost Engineer / Estimator H01 Harbors, piers, Ship Terminals 22 Electronics Engineer H07 Highways, Street, Parking lots 2 23 Environmental Engineer R04 Recreation Facilities 29 GIS Specialist 1 S04 Sewage Collection, Treatment, etc. 2 35 Industrial Engineer S07 Solid Wastes; Incineration; Landfill 38 Land Surveyor S13 Storm Water Handling & Facilities 2 39 Landscape Architect U01 Unexploded Ordnance Remediation 48 Project Manager 1 T02 Testing and Inspection Services 2 57 Structural Engineer T04 Topographic Surveying and Mapping 3 60 Transportation Engineer 1 W03 Water Supply; Treatment, etc. 1 62 Water Resources Engineer 1 Development Other Employees Information Technology Total 7 11 Management Consulting 1 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) PROFESSIONAL SERVICES REVENUE INDEX NUMBER 1. Less than $100,000 2. $100,000 to less than $250,000 3. $250,000 to less than $500,000 4. $500,000 to less than $1 million 5. $1 million to less than $2 million 6. $2 million to less than $5 million 7. $5 million to less than $10 million 8. $10 million to less than $25 million 9. $25 million to less than $50 million 10. $50 million or greater a. Federal Work 1 b. Non-Federal Work 5 c. Total Work 5 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. a. SIGNATURE b. DATE 08/18/2020 c. NAME AND TITLE Luis Jurado – President 4.UNIQUE ENTITY ID 1 1 1 1 22 1 2 1 2 2 2 Request for Qualifications No. 20-07-01 89 RFQ No: 20-07-01 CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) iii. Civil Engineers Category Licenses 90 Page 22 of 35891 Page 23 of 35892 State of Florida Department of State I certify from the records of this office that PREMIERE DESIGN SOLUTIONS, INC is a corporation organized under the laws of the State of Florida, filed on June 19, 2007, effective June 18, 2007. The document number of this corporation is P07000070993. I further certify that said corporation has paid all fees due this office through December 31, 2020, that its most recent annual report/uniform business report was filed on January 24, 2020, and that its status is active. I further certify that said corporation has not filed Articles of Dissolution. Given under my hand and the Great Seal of the State of Florida at Tallahassee, the Capital, this the Twenty-fourth day of January, 2020 Tracking Number: 7376849953CC To authenticate this certificate,visit the following site,enter this number, and then follow the instructions displayed. https://services.sunbiz.org/Filings/CertificateOfStatus/CertificateAuthentication Page 24 of 35893 BROWARD COUNTY LOCAL BUSINESS TAX RECEIPT 115 S. Andrews Ave., Rm. A-100, Ft. Lauderdale, FL 33301-1895 – 954-831-4000 VALID OCTOBER 1, THROUGH SEPTEMBER 30, DBA:Receipt #: Business Name: Business Type: Owner Name: Business Opened: Business Location: State/County/Cert/Reg: Exemption Code: Business Phone: Rooms Seats Employees Machines Professionals For Vending Business Only Number of Machines: Vending Type: Tax Amount Transfer Fee NSF Fee Penalty Prior Years Collection Cost Total Paid THIS RECEIPT MUST BE POSTED CONSPICUOUSLY IN YOUR PLACE OF BUSINESS THIS BECOMES A TAX RECEIPT WHEN VALIDATED Mailing Address: This tax is levied for the privilege of doing business within Broward County and is non-regulatory in nature. You must meet all County and/or Municipality planning and zoning requirements. This Business Tax Receipt must be transferred when the business is sold, business name has changed or you have moved the business location. This receipt does not indicate that the business is legal or that it is in compliance with State or local laws and regulations. - BROWARD COUNTY LOCAL BUSINESS TAX RECEIPT 115 S. Andrews Ave., Rm. A-100, Ft. Lauderdale, FL 33301-1895 – 954-831-4000 VALID OCTOBER 1, THROUGH SEPTEMBER 30, DBA:Receipt #: Business Name: Business Type: Owner Name: Business Opened: Business Location: State/County/Cert/Reg: Exemption Code: Business Phone: Rooms Seats Employees Machines Professionals Signature For Vending Business Only Number of Machines: Vending Type: Tax Amount Transfer Fee NSF Fee Penalty Prior Years Collection Cost Total Paid 0.00 0.00 Paid Paid 33.00 33.00 27940 27940 ENGINEER (ENGINEERING FIRM) ENGINEER (ENGINEERING FIRM) Receipt # Receipt # 315-735 315-735 9542377850 9542377850 0.00 0.00 33.00 33.00 BROWARD COUNTY LOCAL BUSINESS TAX RECEIPT BROWARD COUNTY LOCAL BUSINESS TAX RECEIPT LUIS J JURADO LUIS J JURADO 3.00 3.00 01/20/2008 01/20/2008 PREMIERE DESIGN SOLUTIONS INC PREMIERE DESIGN SOLUTIONS INC WWW-19-00000916 WWW-19-00000916 2019 2019 2019 30.00 30.00 0.00 0.00 PREMIERE DESIGN SOLUTIONS INC MIRAMAR MIRAMAR 10/07/2019 10/07/2019 12781 MIRAMAR PKWY 12781 MIRAMAR PKWY 2020 2020 2020 12781 MIRAMAR PKWY SUITE 205 MIRAMAR, FL 33027 2 2 0.00 0.00 Page 25 of 35894 Page 26 of 35895 Page 27 of 35896 Ron DeSantis, GovernorSTATE OF FLORIDABOARD OF PROFESSIONAL ENGINEERSTHE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THEPROVISIONS OF CHAPTER 471, FLORIDA STATUTESECKARDT, GUSTAVO A.Do not alter this document in any form.13301 SW 107 AVENUELICENSE NUMBER: PE67553EXPIRATION DATE: FEBRUARY 28, 2021This is your license. It is unlawful for anyone other than the licensee to use this document.MIAMI FL 33176Always verify licenses online at MyFloridaLicense.comPage 28 of 35897 Ron DeSantis, GovernorSTATE OF FLORIDABOARD OF PROFESSIONAL ENGINEERSTHE ENGINEERING BUSINESS HEREIN IS AUTHORIZED UNDER THEPROVISIONS OF CHAPTER 471, FLORIDA STATUTESPREMIERE DESIGN SOLUTIONS, INC.Do not alter this document in any form.12781 MIRAMAR PKWYLICENSE NUMBER: CA27940EXPIRATION DATE: FEBRUARY 28, 2021This is your license. It is unlawful for anyone other than the licensee to use this document.SUITE 205MIRAMAR FL 33027Always verify licenses online at MyFloridaLicense.comPage 29 of 35898 Ron DeSantis, GovernorSTATE OF FLORIDABOARD OF PROFESSIONAL ENGINEERSTHE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THEPROVISIONS OF CHAPTER 471, FLORIDA STATUTESJURADO, LUIS JDo not alter this document in any form.12781 MIRAMAR PKWYLICENSE NUMBER: PE66396EXPIRATION DATE: FEBRUARY 28, 2021This is your license. It is unlawful for anyone other than the licensee to use this document.SUITE 205MIRAMAR FL 33027Always verify licenses online at MyFloridaLicense.comPage 30 of 35899 RFQ No: 20-07-01 CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) iv. Surveyors and Mapping Category Licenses 100 Page 35 of 358101 Page 36 of 358102 State of Florida Department of State I certify from the records of this office that PREMIERE DESIGN SOLUTIONS, INC is a corporation organized under the laws of the State of Florida, filed on June 19, 2007, effective June 18, 2007. The document number of this corporation is P07000070993. I further certify that said corporation has paid all fees due this office through December 31, 2020, that its most recent annual report/uniform business report was filed on January 24, 2020, and that its status is active. I further certify that said corporation has not filed Articles of Dissolution. Given under my hand and the Great Seal of the State of Florida at Tallahassee, the Capital, this the Twenty-fourth day of January, 2020 Tracking Number: 7376849953CC To authenticate this certificate,visit the following site,enter this number, and then follow the instructions displayed. https://services.sunbiz.org/Filings/CertificateOfStatus/CertificateAuthentication Page 37 of 358103 BROWARD COUNTY LOCAL BUSINESS TAX RECEIPT 115 S. Andrews Ave., Rm. A-100, Ft. Lauderdale, FL 33301-1895 – 954-831-4000 VALID OCTOBER 1, THROUGH SEPTEMBER 30, DBA:Receipt #: Business Name: Business Type: Owner Name: Business Opened: Business Location: State/County/Cert/Reg: Exemption Code: Business Phone: Rooms Seats Employees Machines Professionals For Vending Business Only Number of Machines: Vending Type: Tax Amount Transfer Fee NSF Fee Penalty Prior Years Collection Cost Total Paid THIS RECEIPT MUST BE POSTED CONSPICUOUSLY IN YOUR PLACE OF BUSINESS THIS BECOMES A TAX RECEIPT WHEN VALIDATED Mailing Address: This tax is levied for the privilege of doing business within Broward County and is non-regulatory in nature. You must meet all County and/or Municipality planning and zoning requirements. This Business Tax Receipt must be transferred when the business is sold, business name has changed or you have moved the business location. This receipt does not indicate that the business is legal or that it is in compliance with State or local laws and regulations. - BROWARD COUNTY LOCAL BUSINESS TAX RECEIPT 115 S. Andrews Ave., Rm. A-100, Ft. Lauderdale, FL 33301-1895 – 954-831-4000 VALID OCTOBER 1, THROUGH SEPTEMBER 30, DBA:Receipt #: Business Name: Business Type: Owner Name: Business Opened: Business Location: State/County/Cert/Reg: Exemption Code: Business Phone: Rooms Seats Employees Machines Professionals Signature For Vending Business Only Number of Machines: Vending Type: Tax Amount Transfer Fee NSF Fee Penalty Prior Years Collection Cost Total Paid 0.00 0.00 Paid Paid 33.00 33.00 27940 27940 ENGINEER (ENGINEERING FIRM) ENGINEER (ENGINEERING FIRM) Receipt # Receipt # 315-735 315-735 9542377850 9542377850 0.00 0.00 33.00 33.00 BROWARD COUNTY LOCAL BUSINESS TAX RECEIPT BROWARD COUNTY LOCAL BUSINESS TAX RECEIPT LUIS J JURADO LUIS J JURADO 3.00 3.00 01/20/2008 01/20/2008 PREMIERE DESIGN SOLUTIONS INC PREMIERE DESIGN SOLUTIONS INC WWW-19-00000916 WWW-19-00000916 2019 2019 2019 30.00 30.00 0.00 0.00 PREMIERE DESIGN SOLUTIONS INC MIRAMAR MIRAMAR 10/07/2019 10/07/2019 12781 MIRAMAR PKWY 12781 MIRAMAR PKWY 2020 2020 2020 12781 MIRAMAR PKWY SUITE 205 MIRAMAR, FL 33027 2 2 0.00 0.00 Page 38 of 358104 Page 39 of 358105 Page 40 of 358106 Page 41 of 358107 Page 42 of 358108 RFQ No: 20-07-01 CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) v. Surveyors and Mapping Category Additional information, awards, size of workforce, past record and financial stability 109 Lines of Business of Premiere Design Solutions, Inc. At PDS we are proud of promoting the success of our clients, through innovative engineered solutions, that adapt to their changing needs. ENGINEERING DESIGN SURVEYING LAND DEVELOPMENT CONSTRUCTIONADMINISTRATIONCONSULTANCY Page 55 of 358110 Airport infrastructure. Mass-transit systems. Transit facilities. Bus stop/shelters. Bike/pedestrian infrastructure. Park and rides. ADA compliance. Life safety improvements. Roadways. Concrete/asphalt milling, resurfacing, marking and signage. Force mains, pipelines and pumping stations. Utilities design and relocation. Sanitary sewer. Treatment plants. Drainage. Storm water management. Water storage. Design-build. ENGINEERING DESIGN SURVEYING LAND DEVELOPMENT CONSTRUCTION ADMINISTRATIONCONSULTANCY Lines of Business of Premiere Design Solutions, Inc. Page 56 of 358111 ENGINEERING DESIGN SURVEYING LAND DEVELOPMENT CONSTRUCTION ADMINISTRATIONCONSULTANCY Topographic and boundary surveys. Land surveying. Control surveying. Elevation certificates. Route surveys. Project stake-out and delineation. Right-of-way survey/mapping. As-built surveys. Construction Surveying. GPS data collection. Robotic and conventional total stations. Lines of Business of Premiere Design Solutions, Inc. Page 57 of 358112 Construction management planning. Program management. Time & schedule management. Engineering inspection. Contract administration. Construction QA/QC. Document control. Cost control. Storm water pollution prevention plans. Maintenance of traffic plans. RFI, shop drawings and change rebuttal documentation. Project stake-out. Construction safety management. ENGINEERING DESIGN SURVEYING LAND DEVELOPMENT CONSTRUCTION ADMINISTRATIONCONSULTANCY Lines of Business of Premiere Design Solutions, Inc. Page 58 of 358113 ENGINEERING DESIGN SURVEYING LAND DEVELOPMENT CONSTRUCTION ADMINISTRATIONCONSULTANCY Storm and sanitary sewer. Field inspections. Parking, drainage, landscaping & lighting. Plans and specifications. Development/review of site plan for code. Project coordination. Value engineering. Wetland mitigation. Water quality/quantity treatment calculations. Lines of Business of Premiere Design Solutions, Inc. Page 59 of 358114 ENGINEERING DESIGN SURVEYING LAND DEVELOPMENT CONSTRUCTION ADMINISTRATIONCONSULTANCY Contract preparation. Land use evaluations and review Feasibility & due-diligence studies. Master planning and permitting. Environmental report. Conceptual planning. Select a design builder. Architectural design. Cost estimation. Roadway & parking design. Wetland remediation. Site storm water management. Water and wastewater. Pre-construction assess. Construction. Post -construction. Lines of Business of Premiere Design Solutions, Inc. Page 60 of 358115 In the Media from Premiere Design Solutions, Inc. 116 The PDS Organization Luis J. JuradoPresident Ana SalazarProject Engineer Felipe OrtizStrategic Management Gustavo EckardtCOO Natalia RiveraCFO, HR, VP Yury PedrozaSales, Marketing & Outreach Coordinator Franklin UribeDevelopment Project Manager Fernando FernándezSurveying Lead Jorge M. OlmoSurveying Technician Engineering Consultants: 1. Candida Garcia2. Caridad Calvo3. Carolyn Read4. Judy Emerson5. Andres Amoedo III Jason McKoyProject Engineer Henry RiveraSurveying Technician Andrés RiveraCAD Technician Gustavo JuradoProject Architect 117 Company Background Premiere Design Solutions, Inc. (PDS) is a local minority firm, established as a Florida Corporation in Broward County on June 19, 2007 with headquarters in Broward County in the City of Miramar, and offices in North Miami and South Carolina, licensed and certified to do business in the State of Florida. Our state license and other applicable certifications, such as the FDOT and County prequalification are available upon request. PDS was founded in the verge of one of the worst economic depressions of recent history. However, implementing the PDS Approach, with unparalleled service and quality in our deliverables, PDS has managed to grow exponentially since its inception with a constant goal of offering exceptional service and high quality engineering and surveying services to private and government clients. PDS is registered as a Disadvantaged Business Enterprise (DBE) and as a Miami-Dade and Broward County CBE firm, and also as a State of Florida SBE firm, and holds technical pre-qualifications in Miami-Dade County and FDOT. PDS is also a SBE firm registered with South Florida Water Management District and an 8(a) firm registered with the Federal Government. As it relates to this project, PDS is licensed and technically qualified to perform Civil Engineering, Land Surveying and Construction Management services. PDS currently has 3 fully staffed offices as shown below: Broward County Corporate Headquarters 12781 Miramar Pkwy, Ste 205 Miramar, FL 33027 Miami-Dade County Miami Branch 1065 NE 125th St., Ste 211B North Miami, FL 33161 York County South Carolina Branch 130 East Main Street, Ste 200A Rock Hill, SC 29730 Proposer’s experience, past performance, financial capabilities, violations, and litigation. RFQ No. 20-07-01 City of Sunny Isles Beach Beach August 2020 118 Qualifications In its relatively short history, PDS has been able to secure important contracts such as the Continuing Architectural/Engineering Services Contract in Federally Funded projects with Miami-Dade Transit, the Continuing Architectural/Engineering Services Contract projects with Broward County Transit, GIS input on all water and wastewater infrastructure assets in the City of Miami Springs, working for the Miami-Dade Water and Sewer Department, the Citywide Topographic Surveys for the City of Opa- Locka CIP program, all the utility design and coordination for the expansion of the South Runway Extension at the FLL Airport. All of these projects give stability to the company and allow for future growth. These projects were procured and are being executed with the PDS approach to help our clients no matter what. The firm's most valuable asset: our professional staff has more than 100 years of combined experience in consulting engineering and surveying services that include pre-design, land surveying, utility investigation, design, construction management, inspection, storm-water, water and wastewater, environmental compliance, land development, site remediation, feasibility studies, value engineering, permitting, and design/build projects, including projects at Port Everglades. Currently, PDS employs on a full time basis five professional engineers (PE), two engineers in training (EI), one Florida Licensed Professional Surveyor and Mapper (PSM), and four technicians and technical staff members. PDS has developed an important strength in the local market, in the surveying, Civil and Transportation Engineering fields, securing continuing engineering contracts with county agencies such as Miami-Dade Transit and Broward County Transit, the two largest transit authorities in the State. PDS core business is with Federally Funded projects, and PDS is experienced in dealing with surveying, engineering and construction of Federally Funded projects, with funding from FTA, FHWA and ARRA Federal Funds. PDS understands the reporting, management and critical schedule deadlines federally funded projects bring. PDS has extensive experience in the topographic surveying and engineering design of pedestrian facilities, as one of our strongest sectors is transit and land development, both, having strong emphasis on pedestrian use. PDS has designed improvements to sidewalks and transit bus stops at over 1,000 locations in south Florida, surveying and designing ADA compliant sidewalks, walkways, landing pads, waiting areas, and bus shelters. PDS has also been involved in the peer review and verification of design documents for a new Miami-Dade Transit pedestrian bridge near the University of Miami. Some of PDS’ experience in municipal projects and track record of delivering projects within budget, finding a way to take the project to a successful completion speaks for itself. Rather than further explaining our experience, the following list shows recently completed projects for a municipality or county agency, executed by PDS as a prime consultant within the project schedule and budget: Proposer’s experience, past performance, financial capabilities, violations, and litigation. RFQ No. 20-07-01 City of Sunny Isles Beach Beach August 2020 119 •Dania Beach Drainage Improvements – West Lake - PDS served as the Design Engineers and Project Managers for this project to provide drainage improvements to a neighborhood community in Dania Beach prone to flooding. The neighborhood located west of West Lake is a low lying community just several inches above sea level and suffers from intense flooding during times of heavy rains coinciding with high tides. The project included the drainage system including drainage wells, exfiltration trench, piping and master drainage pumps discharging into the existing West Lake. This neighborhood of over 500 acres (roughly three quarters of a square mile), is a high profile area that has been the subject of many news reports over the past several years. •City Center Master Infrastructure Pembroke Pines, Florida - (PDS) current staff served as the Design Engineers, Project Managers and Construction Managers for this project to provide master infrastructure improvements for the Pembroke Pines City Center located at the intersection of Pines Boulevard and Palm Avenue adjacent to the existing City Hall. The project included the drainage system including lakes and mitigation area, the potable water system, sanitary sewer system including pump station, roadway design and pavement marking and signage. The infrastructure was designed for intended function of providing the overall services needed for the City Center and total build-out. •Taylor Lane Roadway Improvements, City of Dania Beach - Taylor Lane is a 2,000 linear foot section of roadway located in the City of Dania Beach adjacent to the Fort Lauderdale Hollywood International Airport and the Dania Cut-Off Canal and associated Marinas. As part of the development of the south runway extension at the airport, stormwater run-off was re- directed and has adversely impacted Taylor Lane. This roadway provides the only access to the marinas located on the north side of Dania Cut off Canal west of US 1. •Miramar Pineland Natural Area, City of Miramar - The proposed project includes renovating/remodeling of the existing recreation building, demolishing the existing tennis courts, playground, fencing and any other features not designated to remain and constructing a new parking lot and pavilion, refurbishing an existing pavilion, installation of new sports court lighting, along with associated site improvements including but not limited to parking lot and hardscape improvements, lighting, fencing, landscaping, irrigation, lightning prediction/detection, site video surveillance and WiFi. •Town of Miami Lakes (Phase I) - Transit Improvements at City Bus Stops – Performed Land Surveying, Existing Underground utility Investigation, Civil Engineering, Electrical Design, Structural Design and Construction Administration at 11 locations throughout the Town. •Master Lift Station 11c Upgrades and Rehabilitation – City of Opa-Locka – This project includes renovation and upgrades to the City’s largest lift station, responsible for collecting and pumping most of the City’s sewer into Miami-Dade County System. Project included building renovations, new pumps and standby generator. •Miami-Dade Water & Sewer – GIS Input of all Miami Spring Assets – Performed GIS Input of all existing water and sewer utilities within the City of Miami Springs, digitized as-built, field location of utilities & Conflict resolution. Proposer’s experience, past performance, financial capabilities, violations, and litigation. RFQ No. 20-07-01 City of Sunny Isles Beach Beach August 2020 120 •City of Opa-Locka – Citywide Surveys for CIP Program - Provided Topographic Surveys to about 200,000 LF of roadways throughout the City of Opa-Locka for a Capital Improvement program to improve water and sewer Infrastructure throughout the City. •FDOT District 4 – Transit Improvements throughout Broward County – Provided land surveying, existing underground utility investigation, Civil, Electrical & Structural Design for improvement of 74 bus stop locations in Broward County. •FLL South Runway Extension – Provided existing underground utility investigation, utility design, utility relocating coordination, surveying for As-Built plans and final construction certification of new utilities constructed, as well as construction management services. •Miami-Dade Transit Federal PSA – PDS is the prime consultant to Miami-Dade Transit to provide Architectural/Engineering support for federally transit funded projects. •Broward County Transit – Transit Improvements – Performed Survey, Pre-Design, Design, Permitting and Construction Management for over 500 Transit Improvement locations as the Prime consultant on this General Engineering Contract to provide Architectural/Engineering services. As shown above, at PDS we have a track record of delivering projects within budget and schedule, providing unparalleled responsiveness and excellent communication with our clients throughout the way for an excellent project Performance. Our large list of repeat clients is proof of our performance. Violations and Litigation •Premiere Design Solutions, Inc., has no prior or pending litigation or investigation, either civil or criminal, involving a governmental agency since inception. •Premiere Design Solutions, Inc., has no prior violations or complaints (both substantiated and inconclusive) filed with any governmental agency since inception. Proposer’s experience, past performance, financial capabilities, violations, and litigation. RFQ No. 20-07-01 City of Sunny Isles Beach Beach August 2020 121 $1.51$0.44$0.00$1.69 $0.56 $0.17 $1.80$0.62$0.14‐$0.10$0.10$0.30$0.50$0.70$0.90$1.10$1.30$1.50$1.70$1.90$2.10$2.30Annual RevenueEnd of year AssetsAnnual Net IncomeUS$ MillionsPremiere Design Solutions, Inc., Financial Evolution201720182019122 Form 1120-S U.S. Income Tax Return for an S Corporation OMB No. 1545-0123 Do not file this form unless the corporation has filed or is attaching Form 2553 to elect to be an S corporation.Department of the Treasury Internal Revenue Service Go to www.irs.gov/Form1120S for instructions and the latest information. For calendar year 2019 or tax year beginning , ending A S election effective date Name D Employer identification number TYPE Number, street, and room or suite no. If a P.O. box, see instructions.B E Date incorporatedBusiness activity code number (see instructions) OR City or town State ZIP code PRINT F Total assets (see instructions) Foreign country name Foreign province/state/county Foreign postal code C Check if Sch. M-3 attached $ G Is the corporation electing to be an S corporation beginning with this tax year?Yes No If "Yes," attach Form 2553 if not already filed H Check if:(1) Final return (2) Name change (3) Address change (4) Amended return (5) S election termination or revocation I Enter the number of shareholders who were shareholders during any part of the tax year . . . . . . . . . . . . . . . . J Check if corporation:(1) Aggregated activities for section 465 at-risk purposes (2) Grouped activities for section 469 passive activity purposes Caution: Include only trade or business income and expenses on lines 1a through 21. See the instructions for more information. 1a Gross receipts or sales . . . . . . . . . . . . . . . . . . . 1a b Returns and allowances . . . . . . . . . . . . . . . . . . . 1b c Balance. Subtract line 1b from line 1a . . . . . . . . . . . . . . . . . . . . . . . . . . . 1c 2 Cost of goods sold (attach Form 1125-A) . . . . . . . . . . . . . . . . . . . . . . . . . 2 3 Gross profit. Subtract line 2 from line 1c . . . . . . . . . . . . . . . . . . . . . . . . . .3 4 Net gain (loss) from Form 4797, line 17 (attach Form 4797) . . . . . . . . . . . . . . . . . . 4 5 Other income (loss) (see instructions—attach statement) . . . . . . . . . . . . . . . . . . . 5 6 Total income (loss). Add lines 3 through 5 . . . . . . . . . . . . . . . . . . . . . . . 6 7 Compensation of officers (see instructions — attach Form 1125-E) . . . . . . . . . . . . . . . .7 8 Salaries and wages (less employment credits) . . . . . . . . . . . . . . . . . . . . . . . 8 9 Repairs and maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 10 Bad debts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10 11 Rents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 12 Taxes and licenses . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .12 13 Interest (see instructions) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 14 Depreciation not claimed on Form 1125-A or elsewhere on return (attach Form 4562) . . . . . . . . 14 15 Depletion (Do not deduct oil and gas depletion.) . . . . . . . . . . . . . . . . . . . . . 15 16 Advertising . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .16 17 Pension, profit-sharing, etc., plans . . . . . . . . . . . . . . . . . . . . . . . . . . . .17 18 Employee benefit programs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 19 Other deductions (attach statement) . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 20 Total deductions. Add lines 7 through 19 . . . . . . . . . . . . . . . . . . . . . . . 20 21 Ordinary business income (loss). Subtract line 20 from line 6 . . . . . . . . . . . . . . . . .21 22a Excess net passive income or LIFO recapture tax (see instructions) . . . 22a b Tax from Schedule D (Form 1120-S) . . . . . . . . . . . . . . . 22b c Add lines 22a and 22b (see instructions for additional taxes) . . . . . . . . . 22c 23a 2019 estimated tax payments and 2018 overpayment credited to 2019 . . 23a b Tax deposited with Form 7004 . . . . . . . . . . . . . . . . . 23b c Credit for federal tax paid on fuels (attach Form 4136) . . . . . . . . 23c d Reserved for future use . . . . . . . . . . . . . . . . . . . . 23d e Add lines 23a through 23d . . . . . . . . . . . . . . . . . . . . . .23e 24 Estimated tax penalty (see instructions). Check if Form 2220 is attached . . . . . . . . . 24 25 Amount owed. If line 23e is smaller than the total of lines 22c and 24, enter amount owed . . . . . . 25 26 Overpayment. If line 23e is larger than the total of lines 22c and 24, enter amount overpaid . . . . . . 26 27 Enter amount from line 26: Credited to 2020 estimated tax Refunded 27 Under penalties of perjury, I declare that I have examined this return, including accompanying schedules and statements, and to the best of my knowledge and belief, it is true, correct, and complete. Declaration of preparer (other than taxpayer) is based on all information of which preparer has any knowledge. May the IRS discuss this return with the preparer shown below? See instructions. Yes No Sign Here Signature of officer Date Title Print/Type preparer's name Preparer's signature Date Check if PTIN self-employed Firm's name Firm's EIN Firm's address Phone no. Paid Preparer Use Only City State ZIP code For Paperwork Reduction Act Notice, see separate instructions.Form 1120-S (2019) BCA IVAN NARANJO IVAN NARANJO P00445459 PREMIERE DESIGN SOLUTIONS INC 26-0571068 07/22/2007 12781 MIRAMAR PKWY STE 205 33027-MIRAMAR FL 618,924 07/22/2007 541330 X 3 1,796,354 1,796,354 1,796,354 1,271 1,797,625 434,040 598,231 1,820 42,749 79 50,936 3,204 524,532 1,655,591 142,034 X 03/14/2020 X 45-5382643Naranjo Co PA 916 NW 167 Avenue 33028HOLLYWOODFL 786-287-4472 123 Form 1120-S (2019)Page 4 Schedule K Shareholders' Pro Rata Share Items (continued)Total amount 15a Post-1986 depreciation adjustment . . . . . . . . . . . . . . . . . . . . . . .15a b Adjusted gain or loss . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15b c Depletion (other than oil and gas) . . . . . . . . . . . . . . . . . . . . . . . 15c d Oil, gas, and geothermal properties—gross income . . . . . . . . . . . . . . . . 15d e Oil, gas, and geothermal properties—deductions . . . . . . . . . . . . . . . . . 15e f Other AMT items (attach statement) . . . . . . . . . . . . . . . . . . . . . . 15f 16a Tax-exempt interest income . . . . . . . . . . . . . . . . . . . . . . . . . 16a b Other tax-exempt income . . . . . . . . . . . . . . . . . . . . . . . . . . 16b c Nondeductible expenses . . . . . . . . . . . . . . . . . . . . . . . . . . 16c d Distributions (attach statement if required) (see instructions) . . . . . . . . . . . . . 16d e Repayment of loans from shareholders . . . . . . . . . . . . . . . . . . . . . 16e 17a Investment income . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17a b Investment expenses . . . . . . . . . . . . . . . . . . . . . . . . . . . .17b c Dividend distributions paid from accumulated earnings and profits . . . . . . . . . . 17c d Other items and amounts (attach statement) 18 Income (loss) reconciliation. Combine the amounts on lines 1 through 10 in the far right column. From the result, subtract the sum of the amounts on lines 11 through 12d and 14p . 18 Schedule L Balance Sheets per Books Beginning of tax year End of tax year Assets (a)(b)(c)(d) 1 Cash . . . . . . . . . . . . . . . . . 2a Trade notes and accounts receivable . . . . b Less allowance for bad debts . . . . . . . . 3 Inventories . . . . . . . . . . . . . . . 4 U.S. government obligations . . . . . . . . 5 Tax-exempt securities (see instructions) . . . 6 Other current assets (attach statement) . . . . 7 Loans to shareholders . . . . . . . . . . 8 Mortgage and real estate loans . . . . . . . 9 Other investments (attach statement) . . . . 10a Buildings and other depreciable assets . . . . b Less accumulated depreciation . . . . . . . 11a Depletable assets . . . . . . . . . . . . b Less accumulated depletion . . . . . . . . 12 Land (net of any amortization) . . . . . . . 13a Intangible assets (amortizable only) . . . . . b Less accumulated amortization . . . . . . . 14 Other assets (attach statement) . . . . . . . 15 Total assets . . . . . . . . . . . . . . Liabilities and Shareholders' Equity 16 Accounts payable . . . . . . . . . . . . 17 Mortgages, notes, bonds payable in less than 1 year . . . 18 Other current liabilities (attach statement) . . . 19 Loans from shareholders . . . . . . . . . 20 Mortgages, notes, bonds payable in 1 year or more . . . . 21 Other liabilities (attach statement) . . . . . . 22 Capital stock . . . . . . . . . . . . . . 23 Additional paid-in capital . . . . . . . . . 24 Retained earnings . . . . . . . . . . . . 25 Adjustments to shareholders' equity (attach statement) 26 Less cost of treasury stock . . . . . . . . 27 Total liabilities and shareholders' equity . . . . Form 1120-S (2019) 98,544 98,543 88,917 9,627 92,121 6,422 145,138 127,992 562,338 618,924 21,320 26,916 340,531 247,451 64,007 289 26,295 146,672 172,013 52,913 22,000 1,000 1,000 -98 85,537 562,338 618,924 407,284 456,215 407,284 456,215 2,000 SEE STMT SEE STMT SEE STMT SEE STMT PREMIERE DESIGN SOLUTIONS INC 26-0571068 1,692 19,997 28,186 133,655 124 125 126 127 128 Section F Firm References and Similar Work Completed RFQ No: 20-07-01 CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) 129 RFQ No: 20-07-01 CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) i. Firm References 130 PREMIERE DESIGN SOLUTIONS, INC. Municipal References I.References 1.Broward County Transportation Department 1100 Park Central Blvd., Suite 3500 Pompano Beach, Fl 33064 Ms. Arethia Douglas, P.E. acdouglas@broward.org Project Manager Phone: 954.357.8487 2.Miami-Dade Transit Department 701 NW 1st Court, 15th Floor Miami, FL 33136 Mr. Javier Salmon jsalmon@miamidade.gov Construction Manager Phone: 786.469.52667 3.City of Opa-Locka 780 Fisherman Street, 4th Floor Opa-Locka, FL 33054 Mr. Carlos Gonzalez cgonzalez@Opalockafl.gov Public Works Phone: 305.206.0279 4.Miami-Dade Water and Sewer Department 3071 SW 38th Avenue, Room 331 Miami, FL 33146 Mr. Alex Retamar alex.retamar@miamidade.gov Project Manager Phone: 786-552-4405 5.City of Miami Gardens 18605 NW 27th Avenue Miami Gardens, FL 33056 Ms. Helen Gray, PE hgray@miamigardens-fl.gov Capital Improvements Project Director Phone: 954.270.9247 RFQ No. 20-07-01 City of Sunny Isles Beach Beach August 2020 131 PREMIERE DESIGN SOLUTIONS, INC. Municipal References 6.City of North Miami 12400 NE 8th Avenue North Miami, FL 33161 Mr. John O’Brien jobrien@northmiamifl.gov Transportation Planner Phone: 305.895.9883 7.Town of Miami Lakes 15150 NW 79th Court Miami Lakes, FL 33016 Mr. Luis Sanchez sanchezl@miamilakes-fl.gov Public Works Project Manager Phone: 305.512.7129 8.City of Miramar 2200 Civic Center Place Miramar, Fl 33025 Ms. Bissy Vempala, P.E.bjvempala@ci.miramar.fl.us City Engineer Phone: 954.602.3320 9.City of Pembroke Pines 13975 Pembroke Road Pembroke Pines, Fl 33027 Mr. Joseph McLaughlin, P.E. jmclaughlin@ppines.com City Engineer Phone: 954.435.6511 10.City of Dania Beach 100 W. Dania Beach Blvd. Dania Beach, Fl 33004 Mr. Ronnie Navarro, P.E.rnavarro@ci.dania-beach.fl.us City Engineer Phone: 954.024.3615 11.Florida Department of Transportation – District 4 3400 W. Commercial Boulevard Fort Lauderdale, FL 33309 Mr. Scott Peterson, P.E. Scott.peterson@dot.state.fl.us Design Section II Head RFQ No. 20-07-01 City of Sunny Isles Beach Beach August 2020 132 PREMIERE DESIGN SOLUTIONS, INC. Municipal References Phone: 954.777.4416 12.City of Hallandale Beach 400 South Federal Highway Hallandale Beach, FL 33009 Mr. Tony Gonzalez, P.E.agonzalez@cohb.org Building Official / CRS Coordinator Phone: 954.457.1385 RFQ No. 20-07-01 City of Sunny Isles Beach Beach August 2020 133 RFQ No: 20-07-01 CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) ii. Civil Engineers Category Firm Similar Work Completed 134 OWNER CONTACT Broward County Transit Arethia Douglas, P.E. Service and Capital Planning 1 N Univeristy Dr., 3100A Plantation, FL 954.357.8375 START - COMPLETION DATES 2009 - 2015 KEY PERSONNEL Luis Jurado, PE / Lakshmi Kuttiparambil, PE / Kevin Fulchan, EI / Gustavo Eckardt, PE / Glen Harrelson, PE / Henry Rivera, MS / Fernando Fernandez, PSM DESCRIPTION Premiere Design Solutions, Inc. (PDS) served as the prime consultant responsible for providing professional engineering, surveying and permitting services to Broward County Transit (BCT) for ADA improvements to existing and new bus stop locations throughout Broward County, under the Transit Infrastructure & Shelter Improvements at Bus Stops Project, a Federally funded project. PDS’s responsibilities for this project included existing site documentation, preparation of surveys, existing facility assessment and evaluations, project budgeting, coordination of geotechnical investigations, project schedule development and updates, civil engineering design, permit preparation and processing, modification of permits acquired by the BCT, maintenance of traffic plans, utility relocations coordination, stormwater management, construction management and related construction support services. The PDS professional staff has designed Accessibility improvements to transit facilities in compliance with the Americans with Disabilities Act (ADA) for over 220 bus stops including features like curb and gutter, landing pads, sidewalk connectors, and handicap ramps. In addition, PDS has prepared paving, grading and drainage plans to depict proper stormwater conveyance and retention as required by the proposed improvements. The utility coordination for this project is very rigorous since many of the bus stops are located within high dense urban areas with reduced right-of-way space. In order to accommodate the proposed improvements, PDS has successfully relocated many utilities including but not limited to electrical, traffic, telecommunications, and others. Premiere Design Solution’s role in the project is: Lead design Engineer responsible for the design and management of the project to ensure design completion within the allowable time schedule and budget. Topographic surveys in NAVD 88 and State Plane Coordinates. The design of the paving, grading and drainage to ensure ADA compliance. Processing, completion and submittal of all regulatory agency permits. Engineering construction inspections to oversee construction work as per design plans. Up to date, PDS has completed through this project 14 independent work orders, in several municipalities throughout Broward County. Each work order is handled as a separate project and all have been completed within the required schedule and at or under budget. Broward County Transit ADA Improvements to Transit Facilities County Wide Broward County, Florida 135 LIFTED PARK OWNER City of Miami Gardens Park & Recreation Dept. CLIENT CONTACT Helen Gray Calvin, Giordano & Associates, Inc. (City of Miami Gardens) CONSTRUCTION BUDGET/COST $ 1,000.000.00 COMPLETION DATE October 2019 DESCRIPTION The intent of the project is to construct additional parking spaces within the park facility, just south of the existing guardhouse. In addition, an overflow parking area is proposed along the existing curve behind the restroom building. This project will add 38 newly paved parking spaces and will include the use of asphalt pavement, concrete curbs, concrete sidewalks, pavement markings, and signage. Premiere Design Solutions role in the project is: Lead Civil Engineer and Project Manager for Planning, Estimating, Design, Permitting and Construction Services. Progress meetings with City’s staff and commissioners to provide updates of work performed. Permit and Construction Document Review meeting with City Staff. Bidding and Construction Administrative Services as the Owner representative for the City of Miramar. Premiere Design Solutions Staff’s role in the project was: Site Engineering Design to include the design of the proposed nineteen (19) parking space lot located northwest of Shelter No. 1. Site Engineering Design to include the design of approximately nineteen (19) proposed overflow parking spaces located along the existing sealed curved entrance drive from University Drive. Engineering Design and Analysis shall include the pavement, storm-water, pavement markings, and street signage. A storm-water Pollution Prevention Plan has been prepared as part of the design. Bennett Lifter Park. City of Miami Gardens. Miami Dade County, Florida 136 OWNER CONTACT Broward County Transit Arethia Douglas, P.E. Service and Capital Planning 1 N University Dr., 3100A Plantation, FL 954.357.8375 START - COMPLETION DATES 2013 - September 2018 KEY PERSONNEL Luis Jurado, PE / Gustavo Eckardt, PE / Jason McKoy / Kevin Fulchan, EI / Henry Rivera, MS / Fernando Fernandez, PSM DESCRIPTION Premiere Design Solutions, Inc. (PDS) served as a prime consultant responsible for providing professional engineering, surveying and permitting services to Broward County Transit (BCT) for the Bus Shelter Expansion Program in the analysis and design of existing and proposed Bus Stop locations throughout Broward County, under the Transit Infrastructure & Shelter Improvements at Bus Stops Project. PDS’s responsibilities for this project includes preparation of surveys, coordination of geotechnical investigations, civil engineering design, structural engineering design, electrical design, landscape design, permit preparation and processing, modification of permits acquired by the BCTD, maintenance of traffic plans, utility relocations coordination, stormwater management and construction management. Through this project, PDS has designed over 500 bus shelters at exiting or relocated bus stop locations through 18 independent work orders in various municipalities in Broward County. Features include the addition of curb and gutter, ADA Compliant landing pads, sidewalk connectors, handicap ramps, solar- lighted shelters and shelter pads. In addition, PDS has prepared paving, grading and drainage plans to depict proper stormwater conveyance and retention as per the proposed improvements. Utility coordination has been provided and in order to accommodate the proposed improvements, PDS has successfully designed and coordinated the relocation of existing utilities as necessary. Premiere Design Solution’s role in the project is: Lead design Engineer responsible for the design and management of the project to ensure design completion within the allowable time schedule. Topographic surveys in NAVD 88 and State Plane Coordinates. The design of the paving, grading and drainage to ensure ADA compliance. The design of Electrical components such as lighting and solar power supplies. Structural design of shelter foundation pads and retaining walls as applicable. Processing, completion and submittal of all regulatory agency permits. Construction Engineering Inspection support services to BCT inspectors. All work orders have been completed as independent projects, and all of them have been completed in time and within the allocated schedule. Broward County Transit Bus Shelter Expansion Program Broward County, Florida 137 OWNER City of Fort Lauderdale CLIENT CONTACT ATKINS Humberto Alonso Southeast Florida Manager 2001 NW 107th Ave Doral, FL 305.514.3550 CONSTRUCTION COST N/A ($120,000 - Assessment Fee) COMPLETION DATE November 2016 DESCRIPTION The City of Fort Lauderdale is committed to being a fully connected city of tomorrow by 2035. This can only be achieved by providing safe, convenient, accessible, and comfortable connections. The 2013 Neighbor Survey results indicated that 52% of residents are satisfied with the availability of sidewalks in the City. Additionally, 29% of the residents responded that the maintenance of streets, sidewalks and infrastructure should receive the most emphasis from City leaders over the next two years. As part of the comprehensive effort to address resident’s concerns, the City has embarked on a citywide Sidewalk Assessment Program, utilizing a continuing services consultant contract with Atkins. Work performed under the consultant task order included a GIS inventory of all 420 miles of City-owned sidewalks and an interactive report with sidewalk deficiency, photo and GIS location, type, and length of damage. Premiere Design Solutions, Inc (PDS) served as a sub-consultant to ATKINS on this program and was responsible for providing all of the field inspection and sidewalk condition assessment of the 420 miles of city sidewalks. Work included the coordination and training of field staff in the use of project equipment, such as the Trimble Geo 7 Series and the criteria dictated by the client in the categorization, prioritization and levels required by the project. Assessment included the identification of ADA non-conformances, unsafe sidewalks, cracks and damages. PDS also provided scheduling and coordination of field crews conducting the condition assessment in order to meet the client’s delivery schedule. Data collected was uploaded to the Clients Server for report generation. PDS also conducted Quality Control on data collected, reports and images. Premiere Design Solution’s role in the project is: Equipment Coordination and Staff Training Project Scheduling and performance tracking Existing sidewalk condition assessment using GPS and Camera Equipped data collectors Assessment included ADA deficiencies and condition verification QA/QC of data collected and Coordinated re-assessment of data as required City of Fort Lauderdale Citywide Sidewalk Assessment Program Broward County, Florida 138 OWNER FDOT District 4 CLIENT CONTACT FDOT District 4 Scott Peterson, P.E. Design Section Head 3400 W Commercial Blvd Fort Lauderdale, FL 954.777.4416 CONSTRUCTION COST $2,500,000 COMPLETION DATE January 2012 DESCRIPTION This FDOT Minor Highway Transit Enhancements project consisted of providing ADA compliant Bus Shelters to 73 bus stops throughout the cities of Wilton Manors, Oakland Park and Pompano Beach, all located in Broward County, FL while ensuring the conditions of the bus stops to be compliance with ADA guidelines and regulations. Premiere Design Solutions, Inc. was the prime Designer in this 2.5 Million Design Build Project. The project scope included civil, structural and electrical engineering design for the bus shelters to be installed at the current locations, as well as improvements at bus stops such as landing pads, curb & gutter, drainage improvements, utility coordination, sidewalk restoration, sidewalk transitions, and amenities such as benches, trash cans, solar panels, etc. Mr. Jurado, as the design project manager and utilities coordinator for this project coordinated the design team consisting of civil engineers, structural engineers, electrical engineers and a surveying team. Mr. Jurado was also in charge of the scheduling, permitting and quality control review prior to submittal, meeting with governmental agencies having jurisdiction over the project site location to discuss permitting requirements and issues. Project also included topographic surveys and As-Bults of completed improvements. Premiere Design Solution’s role in the project is: Lead design Engineer responsible for the design and management of the project to ensure design completion within the allowable time schedule. Topographic surveys in NAVD 88 and State Plane Coordinates. Site Grading, structural and electrical design for new bus shelters. Utility Coordination and relocation The design of the paving, grading and drainage to ensure ADA compliance. Processing, completion and submittal of all regulatory agency permits. Engineering construction inspections to oversee construction work as per design plans. FDOT - District 4 Minor Highway Transit Enhancements Broward County, Florida 139 OWNER Miami-Dade Water & Sewer Department CLIENT CONTACT Jose Lopez Computer Service Manager 3071 SW 38 Avenue, Suite 331 Miami, FL 33146 PROJECT COST $400,000 COMPLETION DATE December 2014 DESCRIPTION The Miami-Dade Water and Sewer Department (WASD) is one of the largest public utilities in the United States having more than 7,700 miles of underground water lines, the equivalent of a one-way trip from Miami to Beijing, China. On the wastewater side, there are about 6,200 miles of sewer lines. That’s longer than a roundtrip from Miami to Seattle. WASD provides service to over 2.4 million customers. Approximately 330 million gallons of water are drawn every day from the Biscayne Aquifer for consumer use with a service area of about 396 square miles and 14 potable water pump stations and about 1,000 sewer pump stations. In 2008, the entire water and sewer infrastructure serving Miami Springs was transferred to the Miami- Dade Water and Sewer Department, adding to the system an area of about 80 Million SF with 4,000 costumers, representing about 90,000 Gals of water usage per quarter. PDS worked with WASD to provide support services for implementation of the Department’s GIS system for water and sewer infrastructure, with the priority of Miami Springs acquired utilities. To achieve this, PDS had six GIS Specialists working at WASD entering water and sewer information into the WASD GIS System. Project also includes field data collection and as-built plans research to collect all the required information necessary for the input of all water and sewer infrastructure in Miami Springs. This project will allow Miami Springs Infrastructure to be added to the system and in the end, help with new system installations and to rapidly pinpoint the location of equipment that requires repair or upgrading, as well as to more quickly identify the facilities associated with and properties affected by outages, water leaks and other service problems or emergencies. Premiere Design Solutions Staff’s role in the project is: Use ArcGIS 10 custom program to enter new projects into the GIS layers Use Arc GIS 10 to research reported problems with GIS and/or as-builts and correct them Use ArcGIS 10 and/or custom ESRI AML program to validate and modify GIS layers Read water/wastewater as-builts to investigate and resolve potential inconsistencies in the data Run and interpret error reports and perform QA/QC on GIS input data Perform visual, tabular, and geographic checks on GIS layers Field collection and research of additional information Communicate with County personnel to resolve issues with and Maintain GIS data GIS Services – Miami Springs Infrastructure Miami-Dade Water & Sewer Department Miami-Dade County, Florida 140 OWNER City of Miami Gardens CLIENT CONTACT Bentley Architects + Engineers, Inc. Brenton Daily, P.E. Phone: 407-331-6116 651 West Warren Avenue, Ste 200 Longwood, FL 32750 407-331-6116 CONSTRUCTION COST $15,500,000 COMPLETION DATE September 2019 DESCRIPTION The City of Miami Gardens engaged a Design/Build firm to design, permit and construct pedestrian improvements at the Hard Rock Stadium in the City of Miami Gardens, which had a very aggressive schedule with a firm requirement to have the project complete within a year and prior to the Super Bowl LIV scheduled at this venue for February 2, 2020. The project included two proposed pedestrian prefabricated metal bridges, fully enclosed with galvanized mesh, with a minimum clearance of 17.5’, a span of approximately 145’, height of 15’ and 15’ of inside clear width, with concrete ramps and steps to provide ingress and egress to proposed pedestrian overpass at both locations were also included. Proposed ramps and steps will be constructed in private land, which access to the public will be uninterrupted, open 24 hours a day and an easement granted to the City of Miami Gardens to place proposed ramps in public land. Project also included two pedestrian tunnels, to cross the perimeter road surrounding the stadium, without conflicts to pedestrians. The pedestrian tunnels included prefabricated concrete structures, drainage, underground utility relocation, and sump pump modifications. PDS was retained as the Land Surveyors and Civil engineers for this very aggressive schedule. PDS’s expedited response and experience working at Miami Gardens was key to the successful completion of this project, not only in the design phase but also in the permitting stage. PDS also coordinated the drafting and approval process through Miami-Dade County for the land and aerial easements required for the pedestrian bridges. Premiere Design Solutions Staff’s Task in the project is: Topographic Land Survey Easement and Legal Description Drafting and Coordination Stormwater Management Design Permitting of Civil Components Utility Design and Coordination Hard Rock Stadium Pedestrian Bridges and Tunnels City of Miami Gardens, Florida. 141 OWNER Miami-Dade Transit OWNER CONTACT Javier Salmon Construction Project Manager III 701 NW 1st Court, Suite 1500 Miami, FL 33136 786.473.4710 CONSTRUCTION COST $1,000,000 COMPLETION DATE December 2013 DESCRIPTION Premiere Design Solutions, Inc. (PDS) served as the Construction Project Managers under the Contractor selected to Furnish and Install transit improvements at 72 locations in Miami-Dade County, in the Cities of Homestead, North Miami and Miami Lakes, Bay Harbor Islands, El Portal, Opa-Locka , Florida City, Surfside, North Miami Beach and City of Aventura. These p roject were Federally Funded and coordinated by the Miami-Dade Transit Department. PDS is the main contact for all communications between Contactor, County, City and Federal Agencies in this contract. Project includes the ADA accessibility improvements to bus stop locations, new bus shelters and amenities, new sidewalk and reinforced concrete pads, the relocation of existing bus shelters and permitting activities. The PDS professional staff has been tasked with the permitting through the 10 municipalities involved in this project, coordination with Miami-Dade Transit and the shelter manufacturer for the approval of shop drawings and resolution of field related issues. PDS also developed incidental engineering design plans and the construction schedule, providing monthly updates. Thanks to the vast Transit Improvements experience brought by PDS, these projects have been able to be completed within the strict time frame dictated by owner and Federal Agencies funding this project. Premiere Design Solution’s Duties in the project are: Conduct Pre-Construction visits to identify field problems early on. Obtain permits through Municipalities and Miami-Dade County. Develop and Update Construction Schedule Perform periodic field visits to check progress of construction. Prepare monthly payment requisition packages, including updated project schedule, progress photographs, and related documentation as required for Federally Funded Projects. Prepare Change Notice and Request for Information Documents and negotiate resolution Testing coordination and monitoring Safety and Quality Control during Construction. Incidental Engineering Drawings to obtain necessary permits Liaison between Municipalities, County and Contractor on any aspect related to this project. Miami-Dade Transit ARRA Municipalities Group A&C- Transit Improvements 10 Different Municipalities, Florida 142 OWNER Miami-Dade Transit OWNER CONTACT Mercedes Sosa Manager, Cost Control & Scheduling Engineering, Planning & Development 701 NW 1st Court, Suite 1500 Miami, FL 33136 786.469.5271 CONSULTING FEES $825,000 COMPLETION DATE January 2015 DESCRIPTION Premiere Design Solutions, Inc. (PDS) currently serves as Prime Consulting Firm for Miami-Dade Transit (MDT). MDT is the 14th largest public transit system in the USA, and the largest transit agency in the state of Florida. MDT operates a transportation system which consists of four major components: the Metrobus, connecting most areas of Miami-Dade County; Metrorail, an electrically-powered, elevated, rapid-transit heavy rail system stretching 24.6 miles; Metromover, a 4.4-mile elevated people mover that serves the downtown cen tral business district of Miami; Special Transportation Service (STS), designed to meet the needs of people with disabilities. Overall, MDT moves over 353,000 daily. PDS is the prime consultant on this multi-year contract for Continuous Professional A/E Services for Federally Funded Projects, to develop transit facilities funded through the Federal Transit Administration (FTA). The scope of work includes but is not limited to: technical and operation planning, transit studies, environmental impact statements, permitting, surveying, fire/life/safety consulting, cost estimating, structural, geotechnical, industrial, electrical, systems and mechanical engineering, architecture, tr ansit and transportation planning in accordance with FTA requirements, design criteria, support negotiation of full funding grant agreements, plan & specification reviews, design of new transit facilities, construction engineering and inspections, value engineering, project cost estimates and traffic studies. Premiere Design Solution’s Completed or Ongoing Work Orders Under this Contract Include: SW 344 Street Park-and-Ride Special Inspections – Includes the periodic inspections during construction of this 266 space parking lot adjacent to the Busway, with concrete shelters, continuous concret e canopies and transit lounge. Inspections include masonry, steel, and concrete reinforcing steel. SR 836 Express Bus Service Planning Support and Catex Update – Includes the Traffic Impact Analysis, prepare conceptual alternatives for terminal site and access characteristics, analyze intersections of the proposed SR 836 Express Bus Routes for queue jumps or TSP, Catex Update for FTA Contracts & Procurement Support Services – Included Buy America Interpretation Analysis; An internal audit to procurement files & technical and administrative support. Existing Lease Management & Transit Oriented Development Support Services – Provide staff support services to manage leases on transit properties & transit-oriented developments. Central Bus Garage Roofing Repairs and Bathroom Renovations – Condition Assessment, Design and Construction Support services for roofing and Bathroom improvements. Independent Peer Review for Pedestrian Overpass – 100% Plans Peer Review of a Steel Pedestrian Bridge over US-1 at University Metrorail Station. MDT Bus Service Standards and Design Guidelines – Includes the analysis of service standards at other agencies, and the development of MDT’s own design standards. Miami-Dade Transit Continuous Services for Federally Funded Projects Miami-Dade County, Florida 143 OWNER Town of Miami Lakes CLIENT CONTACT Town of Miami Lakes Luis Sanchez Public Works Project Manager 15150 NW 79th Court Miami Lakes, FL 33016 305-364-6100 CONSTRUCTION COST $220,000 COMPLETION DATE August 2014 DESCRIPTION Premiere Design Solutions, Inc. (PDS) served as the Topographic Surveyor and Engineering Consulting firm for this project which included the field data collection, topographic survey, scope determination and the generation of Demolition, New Construction, Pedestrian Crossing, Pavement Marking and Signage and Maintenance of Traffic Plans. Civil design included the design of pedestrian facility improvements such as concrete landing pads, concrete shelter foundations, concrete sidewalk reconstruction, new ADA compliant pedestrian ramps, new pedestrian crossing with solar rectangular rapid flashing beacon (RRFB) per FDOT standards, striped pedestrian crossing, and work around schools. Project also included electrical drawings for the electrical grounding of the proposed shelters and structural design of the shelter foundation. Project provided the client with the design for ADA sidewalk improvements to 11 locations, new bus shelters, concrete pads, sidewalks and amenities. Project included the coordination with the Town of Miami Lakes, Miami-Dade Transit, and Miami-Dade Public Works as well as the underground utility investigations and permitting. Project was federally funded and had strict budgetary constraints, especially in timing, since the project had to be completed before the end of fiscal year. This forced this project to be a fast track project, and delivered with great quality within the available budget, and most importantly within the necessary time- frame. Premiere Design Solution’s role in the project is: Conduct Pre-Construction visits to identify field conditions Conduct Topographic Surveys Prepared Civil, Electrical and Structural Drawings Design of Sidewalk Improvements Design of new pedestrian crossing with solar RRFB Obtain permits through the Miami Lakes Building Department and Miami-Dade County Town of Miami Lakes Pedestrian & Transit Improvements at 11 Locations Miami Lakes, Florida 144 OWNER City of Miramar. CLIENT CONTACT Wilson Sánchez ENCO, LLC. 3878 Sheridan Street Hollywood, FL 33021 CONSTRUCTION BUDGET/COST $ 250.000.00 COMPLETION DATE Expected May 2018 DESCRIPTION The proposed project includes renovating/remodeling of the existing recreation building, demolishing the existing tennis courts, playground, fencing and any other features not designated to remain and constructing a new parking lot and pavilion, refurbishing an existing pavilion, installation of new sports court lighting, along with associated site improvements including but not limited to parking lot and hardscape improvements, lighting, fencing, landscaping, irrigation, lightning prediction/detection, site video surveillance and WiFi. Premiere Design Solutions role in the project is: Lead Civil Engineer and Project Manager for Planning, Estimating, Design, Permitting and Construction Services. Progress meetings with City’s staff and commissioners to provide updates of work performed. Permit and Construction Document Review meeting with City Staff. Bidding and Construction Administrative Services as the Owner representative for the City of Miramar. Premiere Design Solutions Staff’s role in the project was: Survey/Field Verification—verification of the existing topographic survey provided by the owner. Architectural and Engineering Design Services. Prepared architectural and engineering drawings in compliance with applicable codes, and per the design requirements of the Design Criteria package for this project. Permitting Services. Prepared applications and submitted for approval to the governmental agencies, including the resolution and revision of plans due to agency review comments. Engineering Services during Construction. Miramar Pineland Natural Area. City of Miramar. Broward County, Florida 145 OWNER Broward County Aviation Department CLIENT CONTACT Arethia Douglas, P.E. Service and Capital Planning Broward County Transit Department 1 N. University Dr., 3100A Plantation, FL CONSTRUCTION COST $ 1,200,000 COMPLETION DATE December 2014 – January 2016 DESCRIPTION The Park and Ride facility located at the North Perry Airport provides a location that allows residents in the vicinity of Pembroke Road and University Drive the ability to utilize the Broward County Transit System for transportation throughout the County. The Transit Department provides this facility with over 175 parking spaces on a 2.2 Acre lot, and access to major transit routes throughout Broward County. PDS provided design, permitting and engineering services as the prime consultant during construction for the redevelopment of this parking site. The project was fast tracked with the local City and County governmental agencies, as well as the Broward County Aviation Department for the development of this site in just a few months. The fast tracking included the design and obtaining the necessary permits in just under 30 days. The PDS design included the new pavement section design and the innovative drainage solutions to serve the parking facility in order to meet local permitting code criteria. The scope of work of this project includes the following task: Coordination with County and Government to expedite the project Design and Permitting of a parking facility providing over 175 parking spaces Design of the Drainage System to meet local drainage criteria Pavement Marking and Signage Design Site Lighting and Electrical Design Provide Engineering Services during construction to certify the completion of the project Field Inspections Professional Surveying Services Premiere Design Solutions role in the project was: General civil engineering services, including Paving and Drainage Infrastructure improvements, electrical design, stormwater management and grading design. Provide coordination services as prime consultant of other engineering traits Obtaining Engineering Permits for “Fast-Tracked” project in less than 30 days Construction Management and Engineering inspection construction services. North Perry Airport Park and Ride City of Pembroke Pines Broward County, FL KEY PERSONNEL Luis Jurado, PE / Gustavo Eckardt, PE / Jason McKoy / Kevin Fulchan, EI / Henry Rivera / Fernando Fernandez, PSM 146 OWNER Ocean Reserve Condominium CLIENT CONTACT Ruben Gonzalez, LCAM KW Property Management 19370 Collins Ave. Ste. A-1 Miami, FL 33160 305-792-1331 CONSULTING COST $ 40,000 COMPLETION DATE March 2016. DESCRIPTION The Ocean Reserve Condominium is an existing 16 stories, 40-year-old residential condominium in the City of Sunny Isles Beach, Florida which was in need of numerous repairs and improvements to seek the required 40 year Certification as required by the City. Premiere Design Solutions, Inc. (PDS) was contracted by the Building Association to conduct a 40 Year Inspection and prepare the necessary reports, outlining the deficiencies and improvements necessary of the building to obtain its 40 Year Certification. Upon completion of the required inspections, Premiere Design Solutions, Inc. (PDS) coordinated the preparation of engineering drawings and assisted the Client in preparing Bid Documents to obtain and select bids from contractors to execute the work. PDS was involved in some of the repair projects and provided construction management and inspection services, assisting the client with the acceptance and proper repair of work contracted. Repairs included concrete restoration of balconies, garage concrete restoration, lighting improvements, fire alarm improvements and other general repairs. Upon completion of all construction work, PDS coordinated with the city to obtain the final 40 Year Certification for the Building as required by the City. Services performed by PDS include d: 40 Year Inspections and Reports (Structural and Electrical) Design of necessary Repairs Permitting Coordination with Permitting Agencies Bid Support and Assistance Construction Support Meetings with City to obtain 40 Year Certification Ocean Reserve 40 Year Certification Support Ocean Reserve Condominium Association City of Sunny Isles, Florida 147 OWNER Ocean View Building “B” Condominum Association CLIENT CONTACT Luis Lafaurie President 19380 Collins Avenue Sunny Isles Beach, FL 33161 305-466-2757 CONSTRUCTION COST $ 100,000 COMPLETION DATE October 2012 DESCRIPTION An existing 16 stories, 40-year-old residential condominium in Sunny Isles Beach Florida had been experiencing backups of the main sewer line collecting flows of the building. A floor drain in a trash room kept overflowing with sewer creating major problems to the building condominium association. Line is cleaned by constant jetting but the problem persists. Premiere Design Solutions, Inc. (PDS) was contracted by the Building Association to conduct an existing sanitary sewer assessment to verify condition of the pipe, find the reason the constant sewer back-ups and devise a solution. During the Condition Assessment phase, PDS conducted extensive TV inspections of the pipe along with visual inspections trough trenched dug underneath the slab and researched available as-built information. The downstream gravity collection system was also inspected since sewer line was found flowing full at all times. It was found that the existing 12” collector sewer line under the first floor of the building is starting to show corrosion signs and numerous depressions or “bellies” creating low spots in the pipe with solidification and calcification inside the pipe, reducing the effective inside diameter of the line considerable. Pipe blockages were also found in the gravity collection system outside the building. Findings were presented in a report. PDS proposed a repair design including correction of pipe slope with hangers, replacement of structural deficient piping, and extensive cleaning not only of the pipe under the building but the collection system outside the building. After repairs were completed and cleaning conducted, pipe was flowing freely and sewer overflows have stopped. Repairs were conducted with no disruption to residents. Services performed by PDS staff: Condition Assessment of Sewer Line Repair Procedure and Remediation Alternatives Permitting Coordination with Permitting Agencies Design and Specifications for Sewer Repairs and new Sewer System Construction Management and repair monitoring Ocean View Gravity Sewer Assessment Ocean View Building “B” Condominium Associations City of Sunny Isles, Florida 148 OWNER City of Opa-Locka CLIENT CONTACT C&I Construction and Design, Inc. Aria Austin Public Works Director 780 Fisherman Street, 4th Floor Opa-Locka, FL 33054 305-953-2868 CONSTRUCTION COST $1,475,000 COMPLETION DATE December 2013 DESCRIPTION Premiere Design Solutions, Inc. (PDS) served as the Design Engineer and Construction Managers for this project to provide sanitary sewer upgrades and building rehabilitation to the master lift station in the City of Opa-Locka responsible for the collection of all sanitary sewer flows in the city and routing them to the receiving County pump station view a 12” force main. Project included the structural building renovations, building hardening, completely new electrical system and pump controls, telemetry, replacement of the three main pumps and the design of a standby emergency diesel operated pump. The PDS professional staff has also been tasked with the permitting through the City and the Miami- Dade County Environmental Agency. Project included design calculations for the three permanent pumps, as well as the stand by Diesel pump. Premiere Design Solution’s role in the project is: Conduct Pre-Construction visits to identify field problems early on. Civil, Structural, Mechanical and Electrical Engineering design Lift Station Calculations and Pump Selection Obtain permits through the Cities and Miami-Dade County. Perform periodic field visits to check progress of construction. Prepare monthly payment requisition packages, including updated project schedule, progress photographs, and related documentation as required for Federally Funded Projects. Liaison between Cities, County and Contractor on any aspect related to this project. City of Opa-Locka Master Lift Station 11C - Upgrades and Rehabilitation Opa-Locka, Florida 149 OWNER City of Dania Beach CLIENT CONTACT Ronnie Navarro, P.E. City of Dania Beach 1201 Stirling Road Dania Beach, FL CONSULTING COST $ 50,000 COMPLETION DATE 2015 DESCRIPTION Taylor Lane is a 2,000 linear foot section of roadway located in the City of Dania Beach adjacent to the Fort Lauderdale Hollywood International Airport and the Dania Cut-Off Canal and associated Marinas. As part of the development of the south runway extension at the airport, stormwater run-off was re-directed and has adversely impacted Taylor Lane. This roadway provides the only access to the marinas located on the north side of Dania Cut Off Canal west of US 1. PDS provided design, permitting and engineering services during construction for the development of a drainage system to help alleviate flooding of this roadway from stormwater run-off. The project was designed by PDS and permits were obtained from the local governmental agencies. The PDS design included the development of drainage improvements within the roadway and the development of a dry retention area to collect the stormwater run-off from the roadway. PDS provided support in the contractor selection and conducted engineering during construction services, including final inspection and closeout of the project. PDS also coordinated with Broward County Aviation Department for the contractor selection and ultimate completion of the improvements within a very aggressive time schedule. The scope of work of this project included the following tasks: Coordination with County and Government to expedite the project Design and Permitting of the drainage system to help alleviate roadway flooding Design of the Drainage System to meet local drainage criteria Pavement Marking and Signage Design Provide Engineering Services during construction to certify the completion of the project Premiere Design Solutions Staff’s role in the project was: General civil engineering services, including Paving and Drainage Infrastructure improvements, stormwater management and grading design. Obtaining Engineering Permits for the project Construction Management and Engineering during construction services. Taylor Lane Drainage Improvements City of Dania Beach Broward County, FL C100PAVING, GRADING & DRAINAGE PLANSTAYLOR LANE DRAINAGE IMPROVEMENTSCITY OF DANIA BEACH150 Civil Engineering QA/QC Luis Jurado, P.E. –PDS Project Controls Caridad Calvo -PDS Economic Valuations Andres Amoedo -PDS CAD Services Henry Rivera -PDS Andres Rivera -PDS Project Engineering Jason Mckoy –PDS Ana Salazar -PDS Project Manager Gustavo Eckardt, P.E. –PDS City of Sunny Isles Beach 151 LUIS J. JURADO, P.E. QA/QC Manager EDUCATION B.S. in Civil Engineering, University of North Carolina Charlotte, 2003 PROFESSIONAL REGISTRATIONS • P.E. Florida License No. 66396 • P.E. South Carolina License No. 28394 PROFESSIONAL AFFILIATIONS • Member, American Society of Civil Engineers • FES (Florida Engineering Society – Member) FIELD OF SPECIALIZATION Site Planning Land Use Planning Transit Facilities Planning ADA Compliance ROW Acquisition Land Development Transit Facility Design Permitting Platting Annexation Public Outreach Budgeting YEARS OF EXPEREINCE 17 Years EXPERIENCE SUMMARY Mr. Jurado is a professional engineer registered in the states of Florida and South Carolina with over 17 years of experience in civil, transportation and municipal engineering design. Mr. Jurado currently serves as the President of Premiere Design Solutions, Inc. and he is the professional in charge of all project coordination between PDS and its Clients. PDS recently served as the Prime Consultant for the Department of Transportation and Public Works (DTPW) and Broward County Transit (BCT), the two largest transit authorities in the state of Florida. Mr. Jurado has been the project coordinator for the professional engineering services work assigned to PDS with duties and responsibilities that include meeting on a regular basis with DTPW and BCT officials to provide recommendations on scope of work and schedule for projects, meetings with governmental agencies having jurisdiction over project site locations to discuss and negotiate permitting requirements, complying with Federal Transit Authority (FTA) specifications, Tiger Grants, and quality control review. Mr. Jurado has led his team in transit improvements at more than 1,000 locations in over 30 municipalities in Broward and Miami-Dade Counties. RELEVANT EXPERIENCE Continuous Professional Services for Federally Funded Projects, Miami Dade Transit, Miami-Dade County, Florida. The Continuous Professional Services for Federally Funded projects is a multi-year project to develop transit facilities that are funded through the FTA. The scope of work for this contract includes but is not limited to technical and operation planning, transit studies, environmental impact statements, permitting, engineering inspections, surveying, cost estimating, structural, geotechnical, industrial, electrical, systems and mechanical engineering, architecture, transit planning in accordance with FTA requirements, design criteria, support negotiation of full funding grant agreements, plan and specification reviews for federal compliance, design of new transit facilities, construction engineering and inspections, value engineering, project cost estimates and traffic studies. Mr. Jurado was responsible to oversee eight work orders under this contract performing quality control review and analysis of FTA guidelines, project coordination and assisting upper management at DTPW with prioritizing transit improvements. ARRA Municipalities Groups “A” & “C”, Miami Dade Transit, Miami-Dade County, Florida. The ARRA Municipalities Groups “A” & “C” Transit Improvements projects consisted of transit improvements at 72 locations in Miami- Dade County, in the Cities of Homestead, North Miami, Miami Lakes, Bay Harbor, El Portal, Opa Locka, Florida City, Surfside, North Miami Beach and Aventura. The projects were Federally Funded and coordinated by the Miami-Dade Transit Department, following all American Recovery and Reinvestment Act (ARRA) guidelines and regulations. Projects included ADA accessibility improvements to bus stop locations, new bus shelters and amenities, sidewalk, reinforced conc. pads, relocation of existing bus shelters and permitting with regulatory agencies. Mr. Jurado was involved with negotiating permitting requirements for this project. Pump Station 11-C Rehabilitation, Opa Locka, Miami -Dade County, Florida This project consisted in providing sanitary sewer upgrades and building rehabilitation to the master lift station in the City of Opa-Locka responsible for the collection of all sanitary sewer flows in the City and routing them to the receiving Miami-Dade Water and Sewer pump station through an existing 12” force main and an operating flow of 1,700 gpm. Mr. Jurado was responsible for Municipal Coordination and obtaining permit approvals in a timely manner. In addition, Mr. Jurado implemented the QA/QC procedures and reviews at the 30%, 60%, 90% and 100% design phases including plans, specifications and schedule reviews to ensure project was completed within time and budget established for the project. 152 LUIS J. JURADO, P.E. QA/QC Manager MDT Park-and-Ride at SW 147 Ave and SR 836 Express Bus Service Planning Support, Miami-Dade Transit, FL – Mr. Jurado was the project principal and quality control manager for this project to analyze the impacts of the relocation of an existing terminal located at FIU Main campus to Parking Garage VI, and creating concepts for the Panther Station. Mr. Jurado provided key support and assistance during the update to the Categorical Exclusion Document prepared for FTA to obtain federal support on this project. Mr. Jurado also assisted in the preparation of conceptual design for the panther station, attended and participated in the public meeting for the SR 836 Express Bus Service project, and analyzed route intersections for queue jumps and TSP application and provided reviews of cost estimating tasks. Broward County Transit Shelter Improvement Program, Broward County, FL. This project consisted in the planning and development of various corridors within Broward County to provide improvements consisting of widening for new bus bays, bike-lanes, sidewalks, ADA landing areas, curbing and shelter amenities. An active part of the program was to conduct planning activities to determine existing and future ridership at many of these locations. Through this program over 500 different locations were improved in over 28 municipalities within the Broward County area. Mr. Jurado was responsible for corridor planning and leading efforts in determining the locations to be improved. Mr. Jurado was also responsible for budgeting, scheduling, and general coordination with municipalities; transit authorities and FDOT D4 for permit requirements for the project. C.B. Smith Park Improvements, City of Pembroke Pines, Florida - The C.B. Smith Park project consisted of ADA improvements at the existing bus stop location servicing the park just west of the intersection of Flamingo Rd. and Pines Blvd. The scope of work included new landing and shelter pads, curb & gutter, gate replacement and a sidewalk connector into the park. The project cost was approximately $30,000. Mr. Jurado served as the project manager responsible for overseeing the civil engineering design and obtaining permit approvals through the City of Pembroke Pines, South Broward Drainage District (SBDD), and the Broward County Transit Department (BCTD). FDOT District 4, Broward County Transit Bus Shelter Project, Broward County, Florida. The FDOT Bus Shelter project was a Design-Build project which consisted of providing ADA compliant bus shelters to 73 locations throughout the cities of Wilton Manors, Oakland Park and Pompano Beach, all located in Broward County, Florida but within FDOT ROW. The project scope includes civil, structural and electrical engineering design for the bus shelters to be installed at the current locations, as well as improvements at bus stops such as landing pads, curb & gutter, sidewalk restoration, sidewalk transitions, and amenities such as benches, trash cans and solar panels. Mr. Jurado as the design project manager coordinated the design team consisting of civil engineers, structural engineers, electrical engineers and a surveying team. Mr. Jurado was also responsible for the quality control procedures review prior to submittal and meeting with governmental agencies having jurisdiction over the project site location to discuss permitting. Ravenswood Electric Buses Charging Station Implementation, Broward County Transit, Broward, Florida This project required the topographic survey and underground utility coordination for the implementation of 12 electric bus charging stations at the Ravenswood bus maintenance facility in Dania Beach. This is one of the main facilities in Broward County. Mr. Jurado was the project QA/QC Manager on this project responsible to provide oversee surveying services and review data from underground utility investigation including research of as-builts, and conducted and coordinated the designation and soft digs required to provide accurate data to the project architect about the civil engineering layout and design requirements. The Lauderhill Mall Transit Facility - Broward County, FL - The New Lauderhill Mall Transit Facility is an important Transfer Hub in Broward County area, located at the Lauderhill Mall in the City of Lauderhill at NW 12 Street and NW 42nd Way. The more than one acre development houses 12 bus bays to accommodate articulated, regular and local community buses at a transfer station that currently has a ridership of over 8,000 passengers per day. In addition the facility has 3000 SF of maintenance and operations space for operations needs. Mr. Jurado was responsible for the planning design of the facility and obtaining site plan approval from the City of Lauderhill. Mr. Jurado also coordinated with FDOT District 4’s Consultant (Jacobs Engineering) the SR7 corridor access impact into the facility. North Perry Airport Park and Ride Facility, Pembroke Pines, Florida - Mr. Jurado served as the Project Principal for the development of a Park-and-Ride Facility at the North Perry Airport located on the northeast corner of Pembroke Road and University Drive in the City of Pembroke Pines. The site development included the design of the parking facility including a drainage and lighting system to serve riders of the Broward County Transit System. Mr. Jurado was responsible for client management, and coordination of permitting procedures and 153 LUIS J. JURADO, P.E. QA/QC Manager approvals of the local governmental agencies such as Broward County Transit (BCT), Broward County Aviation Dept. (BCAD) and Pembroke Pines. FLL International Airport Runway Extension over US-1, Broward County Aviation Division, Florida. This project included the preparation of a schematic design for all the utility relocations and proposed utilities required for this project. This is a Design-Build project yet to be awarded, that will extend Runway 9R-27L over US-1 and the FEC Railroad. Mr. Jurado was the Project Principal responsible for the coordination and review of the existing Design Criteria Package, and research of existing utilities in order to prepare a Sound Schematic design with quantities, projected schedule, engineering cost estimates and constructing cost estimate. This utility coordination and relocation plan was submitted as part of the teams technical submittal for this project. Taylor Lane Roadway Improvements, Dania Beach, FL - The project consisted of topographic survey, drainage improvements and roadway improvements for the purposes of providing flood protection for Taylor Lane located in the City of Dania Beach. Mr. Jurado was the Project Lead and was the engineer of record and responsible for providing project coordination and engineering design including the preparation of stormwater calculations and staging models. Project also required the permitting and construction oversight for the improvements to this roadway. The design included creating roadside swales and retention areas, along with storm inlets and drainage piping system to convey the roadway stormwater run-off. The project also included raising sections of the roadway to meet Broward County roadway flood criteria. Water Works 2011, City of Fort Lauderdale, Florida. The WaterWorks 2011 project is a public services program created by the City of Fort Lauderdale to improve the water and wastewater infrastructure of the City of Fort Lauderdale. Under this project, the City invested in excess of $550 millions towards these improvements with the main goal to provide state of the art water treatment and provide a wastewater collection system that will protect the environment and promote a healthier lifestyle. Mr. Jurado was involved in the design of Septic Area 4 and Septic Area 8. Combined both areas totaled over 20,000 linear feet of new gravity sewers, two pump stations, force mains and over 8,000 linear feet of new water mains. Mr. Jurado served as project engineer responsible for engineering plans preparation including profiles and quantity take offs for cost estimating. Pembroke Pines Health Park Senior Living Facility, City of Pembroke Pines, Florida. The Pembroke Pines Health Park is a city controlled and run facility located on the northwest corner of Pembroke Road and University Drive. Over the course of five years, the City demolished much of the existing infrastructure system and constructed three – five story senior living buildings. Mr. Jurado served as project engineer for the master site engineering study, the engineering design and the permitting. Pembroke Pines City Center, Pembroke Pines, Florida (SR-820 & Palm Ave.) This project consisted of a mix- use development that incorporates residential and retail on a 120-acre site located at the intersection of Pines Blvd. and Palm Avenue in the City of Pembroke Pines, Florida. The wastewater component of the project included the design of a new lift station including a 10’ diameter wet well, electrical system and pump controls, telemetry and 75 HP pumps in a dry configuration with an operating point of 750 GPM @ 160’ of Head. The pump station required a 12” diameter Force main extension of 3,000LF to tie at Washington Street south of the proposed pump station. Mr. Jurado served as project engineer responsible for producing engineering plans including the design of the pump station and the wastewater collection and transmission systems. He worked closely with the pump manufacturer to select efficient pumps that would satisfy operating conditions. Baseball Dug-out Replacements, City of Dania Beach, Florida - The Dugout Replacements project consists of replacing two dugouts at the C.W. Thomas Park and four dugouts at the P.J. Meli Park. The scope included replacing the existing structures with new ones and providing ADA access to them. Project cost was approximately $95,000. Mr. Jurado will served as the project manager in charge of the civil engineering design and lead the team which included architecture, structural, and electrical features. Pembroke Pines Health Park Senior Living Facility, City of Pembroke Pines, Florida. The Pembroke Pines Health Park is a city controlled and run facility located on the northwest corner of Pembroke Road and University Drive. Over the course of five years, the City demolished much of the existing infrastructure system and constructed three – five story senior living buildings. Mr. Jurado served as project engineer for the master site engineering study, the engineering design and the permitting. 154 GUSTAVO ECKARDT, P.E. Project Manager EDUCATION B.S. in Civil Engineering, University of North Carolina, 2002 Scheduling Seminar - Primavera Project Management, Miami Micro Data, 2005 Designing Pedestrian Facilities for Accessibility / ADA Seminar 2008. Work Zone Traffic Control & Maintenance of Traffic, FES Seminar, 2010 (BT-05-0079) PROFESSIONAL REGISTRATIONS • P.E. Florida License No. 67553 PROFESSIONAL AFFILIATIONS • Chi Epsilon Civil Engineering Honor Society - Member • FES (Florida Engineering Society - Member) FIELD OF SPECIALIZATION Project Management Contract Compliance Civil Engineering Design Change Order Resolution Change Negotiation Water & Sewer Utilities Collection and Distribution Pipelines Pumping Stations Transportation Transit Facilities ADA Compliance Storm Water Management General Civil Engineering Permitting Bid Preparation & Assistance Utility Coordination YEARS OF EXPEREINCE 19 Years EXPERIENCE SUMMARY Mr. Eckardt is a professional engineer registered in the state of Florida with nearly 20 years of experience in Civil Engineering, Transit Improvement projects and roadway design. Mr. Eckardt is responsible for overseeing engineering plans production, quality control and making sure our Clients needs are incorporated into our engineering design. Mr. Eckardt’s experience in the public sector includes planning and design for new and existing transit infrastructure facilities in different municipalities throughout Miami-Dade and Broward County. For these types of projects Mr. Eckardt has designed Bus Terminal Improvements, Bus Stop Improvements, Bus Shelters, Site ADA Compliance, Park and Ride construction Inspections and many other site and utility infrastructure improvement projects for Miami-Dade County. Mr. Eckardt has also managed and designed potable water and sanitary sewer collection systems for the Miami-Dade Water and Sewer Department, and has a vast experience in utility coordination and land development projects, and is familiar with the required management of staff and sub-consultants on small, medium and large size infrastructure projects. RELEVANT EXPERIENCE 8-Inch Water Main Extensions for the Miami-Dade Water and Sewer Department (M-DWASD), Miami-Dade County, Florida - Mr. Eckardt was responsible for the design of over 10,000LF of 8-inch Ductile Iron Pipe (DIP) of water distribution pipeline throughout Miami-Dade County as part of their Needs Assessment Program. Mr. Eckardt was in charge of this project from conception to final design submittal. Responsibilities included meetings with client, utility coordination, future project coordination, bid document and specifications preparation, design and construction scheduling updates, preparation of engineering cost estimates, design and plans preparation, quality control and coordination with all the stakeholders. MDT Park-and-Ride at SW 147 Ave and SR 836 Express Bus Service Planning Support, Miami-Dade Transit, FL – Mr. Eckardt was the project manager for the prime consulting firm responsible to analyze the impacts of the relocation of an existing terminal located at FIU Main campus to Parking Garage VI, and creating concepts for the Panther Station. Mr. Eckardt also led the update of the Categorical Exclusion Document prepared for FTA to obtain federal support on this project. Mr. Eckardt coordinated conceptual design for the panther station, traffic analysis, conducted public meetings for the SR 836 Express Bus Service project, noise study for Tamiami Station, analyzed route intersections for queue jumps and TSP application and cost estimating. ADA Compliant Bus Stop Improvement, Town of Miami Lakes, Miami Lakes, Florida - Mr. Eckardt was the project manager and engineer of record for this project which included the filed data collection, topographic survey, scope determination and the generation of demolition, new construction, and maintenance of traffic plans. Project provided the client with the design for ADA improvements to 11 bus stops locations, new bus shelters, concrete pads, sidewalks and amenities. Project included the coordination with Town, Miami-Dade Transit, conduct underground utility investigations and permitting. Bennett Lifter Park. City of Miami Gardens, Miami Dade County, Florida. The intent of the project was to construct additional parking spaces within the park facility, just south of the existing guardhouse. In addition, an overflow parking area was proposed along the existing curve behind the restroom building. This project added 38 newly paved parking spaces and included the use of asphalt pavement, concrete curbs, concrete sidewalks, pavement markings, and signage. Mr. Eckardt served as project manager and was responsible for the civil engineering design and all coordination with Owner, Client and stakeholders. Mr. Eckardt also obtained the permits with regulatory agencies for this project. 155 GUSTAVO ECKARDT, P.E. Project Manager Hard Rock Stadium Pedestrian Bridges and Tunnels City of Miami Gardens, Florida. The City of Miami Gardens engaged a Design/Build firm to design, permit and construct pedestrian improvements at the Hard Rock Stadium in the City of Miami Gardens, which completed prior to a big event scheduled for February 2, 2020. Proposed pedestrian prefabricated metal bridge, fully enclosed with galvanized mesh, with minimum clearance of 17.5’, a span of approximately 145’, height of 15’ and 15’ of inside clear width, with concrete ramps and steps to provide ingress and egress to proposed pedestrian overpass. Proposed ramps and steps were constructed in private land, which access to the public will be uninterrupted, open 24 hours a day and an easement granted to the City of Miami Gardens to place proposed ramps in public land. Mr. Eckardt served as project manager and was responsible for the civil engineering design and all coordination with Owner, Client and stakeholders. Mr. Eckardt also obtained the permits with regulatory agencies for this project. Pump Station 11C Upgrades, Opa-Locka, FL. - Mr. Eckardt was the project manager and engineer of record for this project to provide upgrades to the master lift station in the City of Opa-Locka responsible for collection all sanitary sewer flows in the city and routing them to the receiving County pump station via a 12” force main. Project included the structural building renovations, completely new electrical system, pump controls, telemetry, replacement of the three main 140 HP VFD pumps rated at 3200 GPM and the design of a standby emergency diesel operated pump. Permitting services through the City, RER, FPL Coordination & construction support were provided. Miramar Pineland Park Topographic Survey, City of Miramar, Florida. – The proposed project includes renovating/remodeling of the existing recreation building, demolishing the existing tennis courts, playground, fencing and any other features not designated to remain and constructing a new parking lot and pavilion, refurbishing an existing pavilion, installation of new sports court lighting, along with associated site improvements including but not limited to parking lot and hardscape improvements, lighting, fencing, landscaping, irrigation, lightning prediction/detection, site video surveillance and Wi-Fi. Mr. Eckardt as the Project Manager provided coordination design, cost estimate and submittals with client. Citywide CIP Water & Sewer Improvement Surveys, City of Opa-Locka, FL This project includes the topographic route surveys for over 200,000 LF of roadway to receive water and sewer improvements as part of the Capital Improvements Program (CIP) throughout the City of Opa-Locka. PDS is part of the Team to provide design criteria packages for the letting of this work. Mr. Eckardt was the Survey Project Manager on this project and was responsible for coordination of field crews, preparing progress reports to client, scheduling work and production of survey drawings to be presented to the client within the approved project schedule. Pump Station Improvements & Replacement, Miami-Dade Water and Sewer Department (M-DWASD), Miami, Florida - Mr. Eckardt is the project manager and engineer of record for the design of improvements to existing M- DWASD pump Station, including the design of new pump stations. The design includes all disciplines including electrical, structural and mechanical engineering under Mr. Eckardt’s guidance. Project include site layout, some include on-site power generators, paved driveways, concrete slabs and structures and tree relocations as needed. Miami Executive Airport RIM Taxiway Modifications, Miami-Dade Aviation Department, FL – Mr. Eckardt is the project manager for this project to design modifications to the existing configuration of Taxiways “A” and “D” as they intersect and approach Runways 9L and 13 at the west terminus of the Airport. Mr. Eckardt has been responsible for design and coordination of demolition plans, new pavement design, runway and taxiway lighting design, pavement markings & signage, stormwater pollution prevention plans, construction phasing, and access route designation. University Station Pedestrian Overpass Peer Review, Miami-Dade Transit, Florida – This project was led by Mr. Eckardt as Peer Review project manager, and included a comprehensive peer review of design, specifications, constructability and cost estimates developed by the MDT Consultant secured to design the pedestrian overpass at US-1 and Mariposa Drive in Coral Gables, FL to provide connectivity to pedestrians coming to and from the University Station of the MetroRail and in the vicinity of the University of Miami. Mr. Eckardt led the multidisciplinary team of reviewers, and was also responsible for the civil plans and specifications review. MDT Park-and-Ride at SW 344 Street Special Inspections, Miami -Dade Transit, FL – Mr. Eckardt is Responsible for this task to provide special inspections for reinforced concrete and structural elements for the City of Florida City during the construction of this MDT - 266 space parking lot with bus bays and shelters, located west of the southern end of the Busway between NW 2nd Avenue and NW 3rd Avenue at 344th Street. 156 GUSTAVO ECKARDT, P.E. Project Manager Miami-Dade Transit Department, ARRA Municipalities Shelters Groups “A & C”, Miami-Dade County, Florida. The ARRA Municipalities Group “A & C” Transit Improvements projects consisted of two transit improvement projects at over 70 locations throughout Miami-Dade County, in the Cities of Homestead, Florida City, North Miami, North Miami Beach, Miami Lakes, Surfside, Bay Harbor Islands, Aventura, South Miami, Opa-Locka, and El Portal. Project is Federally Funded and coordinated by the Miami-Dade Transit Department, and follows all ARRA and Federal guidelines and regulations. Mr. Eckardt was the Construction Manager and Quality Control representative in the project, and assisted in obtaining all permitting approvals from municipalities and county agencies. Project included the ADA accessibility improvements to bus stop locations, new bus shelters and amenities, new sidewalk and reinforced concrete pads, and the relocation of existing bus shelters. FDOT District 4, Broward County Transit Bus Shelter Project, Broward County, Florida. This Design-Build project consists of providing ADA compliant bus shelters to 73 locations throughout the cities of Wilton Manors, Oakland Park and Pompano Beach, in Broward County. Mr. Eckardt was the project manager responsible for coordinating and generating civil, structural and electrical engineering designs for the bus shelters as well as improvements at bus stops locations such as landing pads, curb & gutter, sidewalk restoration, sidewalk transitions, and amenities. This project required the coordination between the design team consisting of civil engineers, structural engineers, electrical engineers, shelter manufacturer and a surveying team. To ensure the best possible product, this project closely followed a strict quality control procedure review prior to submittal and meeting with governmental agencies having jurisdiction over the project site location. Project included all permitting, including FDOT electronic reviews, and permit through municipalities & construction support services. Miami Executive Airport RIM Taxiway Modifications, Miami-Dade Aviation Department, FL – Mr. Eckardt was the project manager for this project to design modifications to the existing configuration of Taxiways “A” and “D” as they intersect and approach Runways 9L and 13 at the west terminus of the Airport. Mr. Eckardt also served as the construction manager for this project and was responsible for inspections and construction coordination of demolition work, new pavement, runway and taxiway lighting, pavement markings and signage, stormwater pollution prevention, construction phasing and staging, access route designation. Ravenswood Electric Buses Charging Station Implementation, Broward County Transit, Broward, Florida – This project required the topographic survey and underground utility coordination for the implementation of 12 electric bus charging stations at the Ravenswood bus maintenance facility in Dania Beach. This is one of the main facilities in Broward County. Mr. Eckardt was the project manager on this project responsible to provide surveying services and conducted underground utility investigation including research of as-builts, and conducted and coordinated the designation and soft digs required to provide accurate data to the project architect about the civil engineering layout and design requirements. Miami-Dade Water and Sewer Utility Atlas Update and GIS Implementation Miami Springs, FL - Mr. Eckardt is the Project Manager for this Miami-Dade Water and Sewer Department (WASD) project to provide support services for implementation of the Department’s GIS system for water and sewer infrastructure, with the priority of Miami Springs acquired utilities. The main objective of this project is to compile all As-Built Information related to all water and sewer assets of Miami Springs, an area of 1,900 Acres, and upload the information digitally into the WASD GIS System. Mr. Eckardt oversees six full time GIS Specialists working at WASD entering water and sewer utility information and provides monthly updates to WASD management staff. Project also includes field data collection and as-built plans research to collect all the required information necessary for the input of all water and sewer infrastructure of Miami Springs. Mr. Eckardt has been able to successfully execute this project and its completion is ahead of schedule. NW 138th Street Bridge Over Miami River Canal, Miami Dade Public Works, Miami, Florida - This project included the Master Planning, Topographic Survey, Engineering Design and Construction Administration for NW 138th Street, between Okeechobee Road and NW 113th Avenue. This project widens a two-lane undivided roadway to a five-lane undivided roadway section in a highly industrial area. Mr. Eckardt was responsible for the design and coordination required for this project along NW 138th Street between Okeechobee Road and NW 113th Avenue. The design included roadway survey, design, street lighting, paving grading and drainage, traffic signal modifications, striping and a new bridge to replace the existing structure. Mr. Eckardt also provided permitting assistance to Miami- Dade County Public Works Department for this project. Several meetings with FDOT, MDPW, and property owners were required to coordinate the work required for this project. 157 GUSTAVO ECKARDT, P.E. Project Manager ADA Compliant Bus Stop Improvement, Town of Miami Lakes, Miami Lakes, Florida - Mr. Eckardt was the project manager and engineer of record for this project, which included the filed data collection, topographic survey, scope determination, and the generation of demolition, new construction, and maintenance of traffic plans. Project provided the client with the design for ADA improvements to 19 bus stops locations, new bus shelters, concrete pads, sidewalks and amenities. Project included the coordination with Town, Miami-Dade Transit, conduct underground utility investigations and permitting. Fort Lauderdale Airport Runway Expansion Project, Fort Lauderdale, FL - Mr. Eckardt was the Project Quality Control Manager for the utility designs, relocations and coordination related to the FLL Runway Expansion project, to expand the runway over US-1. Mr. Eckardt participated in the generation of engineering drawings for the design of over 5,000 LF of 16” Water Main, and 4,000 LF of 12” Force Main for utility relocations required for this project. The project also included the design of a shared communication duct bank to relocate communication utilities along the corridor. Mr. Eckardt also assisted in the coordination efforts with over 20 Utility Companies with utilities along this corridor that will also be impacted by this project which will need to be relocated. Utility companies included AT&T, FPL, TECO, Comcast, FAA, Windstream, XO, CITGO, Buckeye Pipeline, Qwest, Verizon, Sprint, L3, etc. Project also included the collection of as-built data and production of as-built drawings, and construction support services. Citywide Sidewalk Assessment, City of Fort Lauderdale, Florida - As part of the comprehensive effort to address resident’s concerns, the City has embarked on a citywide Sidewalk Assessment Program. The work included a GIS inventory of all 420 miles of City-owned sidewalks and an interactive report with sidewalk deficiency, photo and GIS location, type, and length of damage. Mr. Eckardt assisted the client in the coordination of training and field data collection of filed survey activities, and assisted field crews in the collection of data and assessing the existing condition of miles of existing sidewalks and pedestrian curb ramps, generating GIS based condition Ives Estates Park Youth Complex, Miami Dade Parks & Recreation, Miami, FL - Mr. Eckardt provided construction administration for this project which consisted of infrastructure improvements to establish a new 94 acre park and regional offices complex on the closed Ojus landfill. Project included construction of a roadway, lighted asphalt parking lots, lighted Soccer field, lighted Baseball Field, playground area, sanitary sewer lift station, striping, drainage and grading, water and sewer mains extension and irrigation system. Duties included design changes, field visits, progress reports, responses to RFI’s, Shop Drawing review, change order review, negotiation meetings & project close out. Miami-Dade West Perrine Park, Miami Dade Parks & Recreation, Miami, FL - Mr. Eckardt served as Project Engineer for the paving, grading, drainage design, and plans production for the addition of a new recreation center, parking lot, and walkways for the West Perrine Park. Mr. Eckardt was also involved in the project administration and field observation phase of this project conducting periodic field visits. Mr. Eckardt also served as Project Engineer for the design of Phase II for this park, which includes a new Aquatic Recreational Facility, with slides, water splash areas and recreational pools. Mr. Eckardt was responsible for the water, sewer and drainage design for this new addition to this project. Clubhouse / Restaurant for Melreese Golf Course, Miami, FL (LEED Silver Certification) - Mr. Eckardt was the Project Manager for this project and provided civil engineering services for the design of a new Clubhouse at the Melreese Golf Course that achieved a LEED Silver Certification. One of the design issues encountered is the existing ash contamination at the site. Mr. Eckardt was also responsible for the water and sewer permitting as well as the drainage and site sustainable design, all civil permitting and construction management. Kendall Soccer Park, Miami-Dade County, Florida - Mr. Eckardt was the construction administration manager for civil field inspections on the Kendall Soccer Park project. The major construction components of this project was the installation of four new artificial turf soccer fields, construction of a new restroom facility, the construction of a new parking lot, construction of a water main extension, new irrigation system interconnected to the existing system and the resurfacing of the existing parking lot. Mr. Eckardt oversaw daily inspections of the construction activities and daily reports that were provided to the client, to verify compliance with contract plans & specs. and also managed the RFI log, change order log, and shop drawing log, and prepared periodic reports to the client. 158 FERNANDO FERNANDEZ, PSM Field Verification / Surveying Lead EDUCATION • Hydrologist Engineer Alma- Ata, former USSR, 1987 FIELD OF SPECIALIZATION • Field Data Collection • Autocad / Land Desktop • Total Station and Data Collector Knowledge • Topographic Surveys • Roadway Surveys • Certificate of Elevations • GPS Field Location • Surveys with NAVD88 and NGVD29 • As-Built Certified Surveys for Water and Sewer projects • Project Stakeout • Writing and interpretations of legal descriptions CERTIFICATIONS • Professional Land Surveyor and Mapper • State of Florida, LS 6765 YEARS OF EXPEREINCE 20 Years EXPERIENCE SUMMARY Mr. Fernandez has over wenty years of field data verification, collection and surveying experience. Mr. Fernandez is a professional proficient in the use of different kinds of GPS Rovers, Data Collectors, Total Station and other surveying equipment, and is familiar with the process to develop Topographic Surveys and As-Built Drawings for Miami-Dade County and Broward County, conducting surveys of above ground features and utility verifications, roadway surveys, construction stake-out and utility project as-builts. Mr. Fernandez has knowledge of Autocad and various tools of the trade. He has the ability to manage multiple tasks, work on projects autonomously, and work as required to meet deadlines. Mr. Fernandez has recently developed as-builts for water and sewer connections, conducted multiple Right-Of-Way surveys for Transit Improvements and is familiar with the department’s requirements for Topographic surveys, having worked at hundreds of transit locations is very knowledgeable of Site ADA issues and deficiencies. Mr. Fernandez is a Florida Registered Surveyor and Mapper and participates personally on field data collection of all assignments under his control, qualifying him as a Surveyor with extensive field knowledge & experience. KEY EXPERIENCE City-Wide Roadway Topographic Surveys for CIP Projects, City of Opa- Locka, FL - Mr. Fernandez is the Chief Surveyor in this project to conduct City- wide surveys of roadways as part of the CIP program to improve water and sewer infrastructure and provide additional stormwater management. This project has been performed by Mr. Fernandez with the latest GPS equipment and data collectors, coordinating field crews and office drafting work to meet the very demanding client schedule of completion. Surveys include ROW to ROW above ground features, drainage and wastewater structure information, delineation of plats and generating survey drawings. Cairo Ln Topographic Survey, City of Opa-Locka, FL - This project was an emergency project to conduct a topographic survey of 2,600LF of roadway in the City of Opa-Locka. Project included the collection of all above ground features, spot elevations, recording of existing roadway conditions, and depiction of right- or-ways along this corridor. Mr. Fernandez was responsible for all field data collection and later conducted reviews of CAD drawings prior to submittal. Transit Improvement Topographic Surveys, Broward County, FL In this project, Mr. Fernandez is responsible of producing certified signed and sealed surveys depicting existing conditions of public right of way locations for several bus stop locations through-out Broward County. This project has been ongoing since 2010 and has produced hundreds of surveys, generally, on public roadways, depicting areas for transit improvements. Mr. Fernandez directs our crew to obtain information on painted utilities, gather field data, locate benchmarks, elevations and coordinates and then providing CAD drawings to our engineering department for design purposes. Duties also include GPS location of point to tie bus stop locations to national datum. Miami-Dade County Bus Stop Topographic Surveys, Miami-Dade County, FL This project includes performing topographic surveys in the municipalities of Pinecrest, Town of Surfside, Bay Harbor Islands, and Miami Lakes. Surveys include the location of all above ground features, locate and translate benchmarks, generate elevations, easement and right-of-way determination for the addition of bus shelters at over 30 local roadway bus stops. Mr. Fernandez directs our crew to obtain field information and then reviews CAD drawings to be later provided to our engineering department for design purposes. 159 FERNANDO FERNANDEZ, PSM Surveying Lead ADA Compliant MDT Bus Transit Improvements, Town of Miami Lakes, Miami Lakes, Florida. - Mr. Fernandez was the project surveyor for this project which included the filed data collection, topographic survey, scope determination and the generation of demolition, new construction, and maintenance of traffic plans. Project provided the client with the design for ADA improvements to 11 bus stops locations, new bus shelters, concrete pads, sidewalks and amenities. Mr. Fernandez was responsible for the generation of survey files at the 11 sites to be used for the engineering design on this project. NE 10th Street & NE 7th Avenue Roadway Improvements, Dania Beach, FL. Project consisted of extension of NE 10th Street to the east to intersect with NE 7th Avenue and reconstruction of NE 7th Avenue from this intersection to the north intersection with Taylor Road. Project proposed water and sewer improvements along this roadway corridor. Mr. Fernandez was responsible for the topographic survey of this roadway corridor, including construction stake-out and collection of as-built data and preparation of final as-built drawings for the project including as-built elevations and alignments. Broward County Transit Copans Facility Master Plan – Project was to perform an assessment, boundary and topographic survey of the existing conditions of the Copans Transit Facility located at 3201 West Copans Road in Broward County and the adjacent corridor. The intent of this assessment was to determine the conditions of functionality for the existing facility and to develop a new master plan concept divided into phases that will accommodate future needs and improvements. The project is located in Pompano Beach on the northeast corner of the intersection of the Florida Turnpike and Copans Road. The site is responsible for fueling, washing, repairing, and parking of Broward County Buses, while also training new employees. Mr. Fernandez was responsible for performing boundary and topographic survey of the project site to serve as the base layout for design purposes. Taylor Lane Roadway Improvements, Dania Beach, FL. - The project consisted of topographic survey, drainage improvements and roadway improvements for the purposes of providing flood protection for Taylor Lane located in the City of Dania Beach. Mr. Fernandez was the Project Surveyor and was responsible for conducting field data collection of above ground features including elevations and CAD drawing production for the later design, permitting and construction oversight for the improvements to this roadway. The design included creating roadside swales and retention areas, along with storm inlets and drainage piping system to convey the roadway stormwater run-off. The project also included raising sections of the roadway to meet Broward County roadway flood criteria. Fort Lauderdale Airport Runway Expansion Project, Fort Lauderdale, FL – this project proposes to expand the runway over US-1. Mr. Fernandez participated in the generation of topographic surveys in relation to the underground utility designs of engineering drawings for over 5,000 LF of 16” Water Main, and 4,000 LF of 12” Force Main for utility relocations required for this project. The project also included the design of a shared communication duct bank to relocate communication utilities along the corridor. Mr. Fernandez provided periodic field visits to record as-built information and provided survey controls during construction activities. FDOT District 4, Broward County Transit Bus Shelter Project, Broward County, FL . This Design-Build, fast track, project consisted of providing ADA compliant bus shelters to 73 locations throughout the cities of Wilton Manors, Oakland Park and Pompano Beach, in Broward County. Mr. Fernandez was the project Land Surveyor responsible for the generation of topographic surveys along local roadways, recording all above ground features at all the sites, utilizing GPS equipment and coordinating work between survey crew, client and engineer. Volume Determination Survey, Biscayne Landing, North Miami, FL.- Mr. Fernandez was the surveyor responsible for the field data collection of elevations required for the calculation of stock pile and lakes volumes within the boundaries of a mixed used development project currently under construction in North Miami known as Biscayne Landing. Project included field data, location of benchmarks, lake soundings, contours and volume calcs. Broward County Transit Terminal Improvements, Broward County, Florida. For this project, Mr. Fernandez conducted a pre-design site inspection and assessment to help determine improvements and scope of work to be performed at each facility. Project included two terminals: Lauderhill Mall Terminal and West Regional Terminal. After initial assessment, Mr. Fernandez was responsible to generate a topographic survey reflecting all above ground features and any marked utilities at both locations. Survey included pavement striping and storm water management features including manholes, pipe sizes, direction, material and bottom and rim elevations. All data was collected using NAVD 88 and state plane coordinates. 160 HENRY RIVERA Safety Engineering Inspector EDUCATION Master of Science in Industrial Engineering, University of Pittsburgh, 1978 Master of Science in Mathematical Statistics University of Chile, Santiago de Chile, Chile 1971 B.S. in Industrial Engineering, Santander Industrial University, Bucaramanga, Colombia 1968 FIELD OF SPECIALIZATION Roadway Systems Roadway and Transit Improvements Safety in the Work Zone Potable Water Distribution Systems Waste Water Collection and Transmission Systems Project Scheduling Storm Water Management Systems. Maintenance of Traffic Field Inspections Transit Improvements General Civil Engineering YEARS OF EXPERIENCE 40 Years EXPERIENCE SUMMARY Mr. Rivera is an engineer with over 40 years of experience specializing in industrial safety programs that enforce safety codes in order to reduce the risks of accidents. As a lead safety engineer, Mr. Rivera had to familiarize himself with civil engineering and construction practices and enforce safety standards to contractors that performed work at several coalmines were he led the safety programs. Mr. Rivera joined PDS as an engineer in 2008 and has been the office Safety Manager since then, also operating AutoCAD Civil 3D. He is responsible for maintaining our CAD standards and ensuring that every project that is ready to be delivered meets those standards. Mr. Rivera also provides CEI support performing field inspections, daily reports and monitoring construction progress. KEY EXPERIENCE ADA and Transit Improvements, Broward County, FL. The ADA Transit Improvements project was a multi-year project consisting of designing and Constructing Transit Improvements through-out Broward County to be compliant with ADA guidelines and regulations. One of the main objectives of the program is to provide ADA accessibility to thousands of bus stops within the County. The project scope includes surveying, engineering design and CEI for improvements at bus stops such as landing pads, shelter pads, curb & gutter, sidewalk restoration, sidewalk transitions, etc. Mr. Rivera’s duties and responsibilities included the assistance preparation of engineering design drawings utilizing AutoCAD Civil 2012 computer aided software and performing periodic field visits to ensure contractor’s adherence to construction documents. B Bus Bay Improvements (Broward Blvd. & NW 116th Ave.), Broward, FL Mr. Rivera was responsible for the initial site visit to determine extent of design work, performed existing condition survey, assisted in the engineering drawings preparation for the removal of existing bus bay, roadside design of approximately 600 ft of roadway to accommodate a 10 ft unpaved shoulder, wet detention areas and pedestrian sidewalks. Responsibilities also included the preparation of utility plans to depict existing utilities within the area and conducting periodic field inspections and inspection daily reports. Bus Bay Improvements (SR 858 & SW 148th Ave.), Broward County, FL Mr. Rivera was responsible for the initial site visit to determine extent of design work, performed existing condition survey, assisted in the engineering drawings preparation for the design of a new bus bay which included the geometric design layout for the new bus bay, roadside design of approximately 300 ft of roadway to include a 6 ft paved shoulder, 5 ft bike lane, dry retention areas and pedestrian sidewalks. Responsibilities also included the preparation of utility plans to depict existing utilities within the area and conducting periodic field inspections and inspection daily reports. NE 10th Street & NE 7th Avenue Improvements, Dania Beach, FL This project to extend NE 10th Street to the east to intersect with NE 7th Avenue and reconstruction of NE 7th Avenue from this intersection to the north to the intersection of Taylor Road required field inspections conducted by Mr. Rivera. Project included water and sewer improvements along these roadway corridors. Mr. Rivera worked with Broward County Environmental Regulation Division, Broward County Health Department and City of Dania Beach for Project permitting and close-out. Mr. Rivera was responsible for the generation of As- Built drawings for roadway widening including water and sewer utility components on this project. 161 HENRY RIVERA Safety Engineering Inspector Sewer Service, RK Oil Inc (Shell Gas Station), Palmetto Bay, FL - Mr. Rivera assisted during the design and field condition assessment phases on this project to design a new sewer system that will service the proposed site, which was in septic tank. PDS also processed permit applications with Miami-Dade Water and Sewer Department, Miami-Dade DERM and the City of Palmetto Bay. Mr. Rivera was tasked with Construction Inspection Engineering services, and was responsible to ensure the construction was being performed in accordance with the permit documents with safe construction practices. New Hope Church, Town of Southwest Ranches, FL - Mr. Rivera was the Cad Manager and CAD Quality Control Manager involved in the design, permitting and construction certification for a church and children’s day care located along Dykes Road, north of Sheridan Street. The project consisted of lake and mitigation design for stormwater run-off collection, as well as paving and drainage design and potable water and sanitary sewer design. Project also included the drafting of topographic survey and generation of as-built survey drawings. FDOT District 4, Broward County Transit Bus Shelter Project, Broward County, FL. This Design-Build project consisted on providing ADA compliant bus shelters to 73 locations throughout the cities of Wilton Manors, Oakland Park and Pompano Beach, in Broward County. Mr. Rivera was the CAD Manager on this project responsible for setting up all drawings on this project, including topographic surveys and engineering drawings. This project required the coordination between the design team consisting of civil engineers, structural engineers, electrical engineers, shelter manufacturer and our surveying team. Mr. Rivera also assisted the field crew on this project by helping in the field data collection operation to be able to meet the strict schedule requirements set by the Design- Build Team. Regions Bank, Weingarten Realty, Pembroke Pines, FL - As CAD Technician for this project, Mr. Rivera drafted the water, sewer, drainage, cable and power infrastructure for the proposed 2-Acre site. Mr. Rivera assisted in the processing of permits with the City of Pembroke Pines, South Broward Drainage District, South Florida Water Management District, Broward County EPD Sewer, Health Department, FPL and ATT. Mr. Rivera also assisted in the Construction Inspection Engineering Services part of the scope of work conducting field inspections, preparing inspection reports and project close-out documentation. Stop N Shop Plaza, Andes Construction Group, Miami Gardens, FL - This City of Miami Gardens project included the renovation of the façade for the existing 30,000 S.F. building. Mr. Rivera assisted in the design of the pedestrian sidewalks and concrete canopy eyebrow servicing the facility. ADA standards had to be met in order to allow proper ingress/egress access into the facility. Mr. Rivera was responsible to produce all CAD drawings as required by this project. Safety Consultant Engineer - Led safety programs with the company’s contractors to assure compliance with the safety standards and company policies in an attempt to minimize accidents within the work area. Through his participation, Mr. Rivera helped the company prevent accidents on daily operations by enforcing safety codes and regulations. Mining Operations Senior Engineer - Mr. Rivera coordinated and trained operational teams across the company on conducting operational risk analysis that affected safety, health and environment. Mr. Rivera also administered safety programs for nearly 50 contractors to comply with safety standards and policies during the mining operations. He also designed and implemented a computerized system to keep track as to when and how safety deviations, detected in safety audits, were met in the various departments. Mr. Rivera Supervised quality computer services for the mine operation. Conducted technical and economical feasibility studies of projects (Transportation of water from the Mine to the Port, optimization of processes at the water plant, among others). He also supervised the implementation of several information systems for the mine operation. (Computerized Truck Dispatching System, Simulation model for Coal quality tracking, Simulation model to assess the infrastructure capacity for the coal operation, among others). 162 JASON MCKOY Project Engineer EDUCATION Btec National Diploma in Computer Graphic Design The Sheffield College, 1995 B.A. in Architecture, (RIBA Part 1) Leeds Metropolitan(Beckett) University, Leeds, UK, 1999 Post Graduate Diploma in Architectural Studies / Urban Design(RIBA Part 2) Leeds Metropolitan(Beckett) University, Leeds, UK, 2003 Masters in Architectural Professional Studies Architect Architects Registration Board (A.R.B.) UK (RIBA Part 3)Leeds Metropolitan(Beckett) University, Leeds, UK, 2006 PROFESSIONAL REGISTRATIONS • Registered Architect 2006 A.R.B. UK – No. 072168I PROFESSIONAL AFFILIATIONS • Architects Registration Board U.K. - Member FIELD OF SPECIALIZATION Architectural Design Space Planning Conceptual Design Graphic/ 3D Presentation AutoCAD/Graphics Software ADA Compliance Sustainable Design Specifications Construction Management Utility Coordination G.I.S. Data Management YEARS OF EXPEREINCE 14 Years EXPERIENCE SUMMARY Mr. McKoy is a professional Architect registered in the U.K. before relocation to become resident in Florida with over 14 years of experience in Architectural / Civil Engineering and Graphic design. Mr. McKoy is currently a Resident Project Representative (RPR) or Construction Manager for Broward County Aviation Department (BCAD) for various projects at the Fort Lauderdale International Airport. Mr. Mckoy also served for five years as construction manager for Broward County Transit (BCT) on various work assignments of their ADA improvement projects County wide, consisting of Pre-fab and cast in place shelter / amenities installations and accessible transit infrastructure design and construction. Mr. McKoy’s general experience in the public sector includes design and management of projects including schools, health centers, community youth facilities, office buildings, libraries and various community based projects. All of which advanced his skills of quickly and clearly taking projects from field analysis to design to construction and completion repeatedly within project time schedules and budget. RELEVANT EXPERIENCE Architectural and Engineering (A/E) Services for the Transit Division, Broward County Transit, Broward County, Florida - The A/E Services for the Transit Division project consists of providing comprehensive professional A/E services on a continuing term basis for the remodeling, renovation and new construction of transit facilities in which construction costs do not exceed $2 million. Project includes existing facility & site documentation, project budgeting, cost estimating, schedule development and analysis, facility programming, complete A/E design of buildings, on-site and off-site improvements, contract and bidding document development, code analysis, permitting assistance and procurement, bid negotiation support, construction contract administration services, inspections, surveying, computer- aided and manually generated graphics support, preparation of narratives and other textual project support, photographic and video-graphic project support, building information modeling (BIM) project support, GIS project support and information system project support. Mr. McKoy served as project engineer in this project working at the Broward County Offices, helping execute multiple work orders. CBIS/CBRA/BHS Program Civil Engineering at Miami International Airport, Miami-Dade Aviation Department, FL - The South and Central Terminals Checked Baggage Inspection Systems (CBIS) / Checked Baggage Reconciliation Areas (CBRA) / Baggage Handling System (BHS) Program is a part of a $160-Million-dollar program to centralize all baggage operations of these two terminals in a new modern facility. The Engineering phase, estimated at $1.6 Million included a new 4 Stories- 70,000 SF building, and necessary modifications to the Central and South Terminals to accommodate the new Baggage systems. Mr. Mckoy assisted in the Construction Management for the civil component of the program. Tasks completed included the design and inspection of new water and sewer services for the building, underground utility coordination, concrete pavement design, pavement markings, signage, and maintenance of traffic. Project also included necessary civil coordination for the design and inspection of a temporary baggage make-up device requiring a 12” fire line relocation, new monitoring wells, and cleanout relocation. Fort Lauderdale Airport North Runway Rehabilitation Project, Broward County Aviation Department (BCAD), Fort Lauderdale, FL – Mr. McKoy is the Project Construction Manager for the concrete and asphalt pavement rehabilitation of the North Runway at the Fort Lauderdale International Airport (FLL). Mr. McKoy conducted daily inspections and recorded daily inspection reports with pictures, recording quantities, tracking deliveries and ensuring adherence to contract documents for the rehabilitation of the North Runway Asphalt Pavement project. 163 JASON MCKOY Project Engineer Fort Lauderdale Airport East Pond Irrigation Main, Broward County Aviation Department (BCAD), Fort Lauderdale, FL – Mr. McKoy was the Project Construction Manager for this project to install 4,000 LF of 16” Water Main for irrigation system tied to the FLL Airport. Pipe Alignment runs along US-1 and requires heavy Maintenance of Traffic and installations using open trench and trenchless installation methods. Mr. McKoy conducted daily inspections and recorded daily inspection reports with pictures, recording quantities and ensuring adherence to contract documents for the rehabilitation of the North Runway Asphalt Pavement. Mr. Mckoy also conducted required pressure testing and assisted in project close-out and preparation of record drawings. Fort Lauderdale Airport Westside Water Main Expansion Loop, Broward County Aviation Department (BCAD), Fort Lauderdale, FL – Mr. McKoy was the Project Construction Manager and resident project representative (RPR) for this project to install 15,000 LF of 12” and 6” Water Main as part of their needed water main loop. This transmission line runs along the west side of the FLL Airport requires heavy Maintenance of Traffic and installations using open trench and night time installation methods. Mr. McKoy conducted daily inspections and recorded daily inspection reports with pictures, recording quantities and ensuring adherence to contract documents and coordinated work with BCAD various departments, and other contractors in the airport area like the work at the Rehabilitation of the North Runway Pavement project. Mr. Mckoy also conducted required pressure testing and assisted in project close-out and preparation of record drawings. North Perry Airport Park and Ride Facility, Pembroke Pines, FL - Mr. McKoy served as the Project Construction Manager for the development of a Park and Ride Facility at the North Perry Airport located on the northeast corner of Pembroke Road and University Drive in the City of Pembroke Pines. The site development included the design of the parking facility including a drainage and lighting system to serve riders of the Broward County Transit System, and a reconfiguration of the parking lot. Mr. McKoy was responsible for the coordination of permitting with the local governmental agencies and overseeing construction of this facility for Broward County Transit and the City of Pembroke Pines. Project was fast track and required expedited completion to secure federal funds. Ravenswood Electric Buses Charging Station Implementation, Broward County Transit, Broward, FL – This project required the topographic survey and underground utility coordination for the implementation of 12 electric bus charging stations at the Ravenswood bus maintenance facility in Dania Beach. This is one of the main facilities in Broward County. Mr. McKoy was the project field representative leading the field crews tasked with demarcation and soft dig operations. Mr. McKoy also coordinated with survey crews to collect survey grade locations of soft digs and ground elevations and was responsible for generating the underground utility verification plan and field notes. Broward County Transit–Consulting Services, Ft. Lauderdale, FL - Mr. McKoy rendered consulting services to BCT on the following projects: • Worked as part of an architectural team within the Broward County Transit offices, providing design and management services for the new Transit Bus Shelter design and ADA improvement projects throughout Broward County. Work duties Included field data collection, site visits, processing of work authorizations leading to design packages and engineering drawings and specifications required to obtain permitting and approvals for construction. • Worked collaboratively with Broward County Transit, under the supervision of BCT Staff, Service and Capital Planning department using his background and expertise in architectural design to produce construction engineering drawings and management of Broward County in-house projects including 3D design proposals for future civil infrastructure developments, including transit terminal developments and future roadway design proposals. 164 JORGE MICHEL OLMO SURVEY FIELD TECHNICIAN EDUCATION B.A. in Architecture, Central University of Villa Clara, Cuba 1996 Specialized Computer Aided Design & Drafting, Autodesk Technical Institute, Malaga, Spain 2010 Online Web Courses – Implementing New CAD Techniques (Tips and Shortcuts / Last Versions) FIELD OF SPECIALIZATION Topographic Surveys Field Data Collection Volume Determination ADA Compliance CAD Design Water & Sewer Drafting Permitting Construction Management Field Inspections Utility Coordination YEARS OF EXPEREINCE 20 Years EXPERIENCE SUMMARY Mr. Olmo is a season professional, Architect by study but experienced in engineering design and construction management with heavy experience in surveying related activities. He has over 20 year of experience in computer aided drafting and design of engineering and architectural projects and proficient in AutoCAD Civil 3D utilizing its tools, attributes, layering system and cad set up environments. Mr. Olmo is experienced in Water and Sewer projects, as well as Structural and Architectural specialties. Mr. Olmo is also experienced in the generation of 3D models by using AutoCAD Architecture, Revit Architecture, Civil 3D, BIM, Sketch up Pro and Adobe Photoshop. Mr. Olmo has also been responsible for the field data collection of features and their representation on company projects including surveying drawings, civil engineering and land development project for our firm. Mr. Olmo serves as field technician and his attention to detail and ability to communicate effectively with other team members makes him an asset for all our projects. KEY EXPERIENCE Citywide CIP Water & Sewer Improvement Surveys, City of Opa-Locka, FL This project included the topographic route surveys for over 200,000 LF of roadway to receive water and sewer improvements as part of the Capital Improvements Program (CIP) throughout the City of Opa-Locka, to be completed with a very aggressive schedule. Mr. Olmo was the Field Technician responsible for the collection of field data to prepare existing condition surveys of Right of Ways identified to be developed by the City of Opa-Locka. Cairo Ln Topographic Survey, City of Opa-Locka, FL - This project was an emergency project to conduct a topographic survey of 2,600LF of roadway in the City of Opa-Locka. Project included the collection of all above ground features, spot elevations, recording of existing roadway conditions, and depiction of right-or- ways along this corridor. Mr. Olmo assisted in the collection of field data, and was responsible for generating the CAD drawings for this project. ADA Compliant Bus Stop Improvement, Town of Miami Lakes, FL - Mr. Olmo was field data collector and project CAD drafter for this project which included the filed data collection, topographic survey, scope determination and the generation of demolition, new construction, and maintenance of traffic plans. Project provided the client with the design for ADA improvements to 19 bus stops locations, new bus shelters, concrete pads, sidewalks and amenities. Project included the coordination with Town, Miami-Dade Transit, conduct underground utility investigations and permitting. ADA and Transit Improvements, Broward County, FL. - The ADA Improvements project is a multi-year project consisting of designing Transit Improvements throughout Broward County that are to be compliant with ADA guidelines and regulations. One of the main objectives of the program is to provide ADA accessibility to thousands of bus stops within the County. The project scope includes surveying, engineering design for improvements at bus stops such as landing pads, shelter pads, curb & gutter, sidewalk restoration, sidewalk transitions, etc. Mr. Olmo’s duties and responsibilities include the preparation of engineering design drawings utilizing AutoCAD Civil 2012 computer aided software. 165 JORGE MICHEL OLMO SURVEY FIELD TECHNICIAN Bus Terminal Concepts, Miami-Dade Transit, Miami, FL – Mr. Olmo was responsible for the generation of CAD drawings and preliminary designs of several conceptual drawings to present alternatives on a proposed Transit Terminal at the Main FIU Campus. Concepts included roadway modifications and improvements to allow exclusive bus lanes and also signal modifications. Mr. Olmo utilized AutoCAD tools such as autoTURN and turning radius templates to verify viability of roadway design features and modifications. Transit Improvement Topographic Surveys, Broward County, FL In this project, Mr. Olmo is responsible for producing surveying and engineering drawings depicting existing conditions of public right of way locations for several bus stop locations throughout Broward County. This project has been ongoing since 2010 and has produced hundreds of surveys, generally, on public roadways, depicting areas for transit improvements. Mr. Olmo assists in data collection to obtain information on painted utilities, gather field data, locate benchmarks, elevations and coordinates and then provides CAD drawings to our engineering department for design purposes. Duties also include GPS location of point to tie bus stop locations to national datum. Sidewalk Assessment and GIS Representation, City of Fort Lauderdale, Broward County – This project consisted in field data collection and assessment of the existing condition of all the existing sidewalks within the City of Fort Lauderdale, which consist of over 400 miles of sidewalks. Mr. Olmo was responsible for field data collection utilizing GPS devices that would later sync data collected with the GIS application developed for this project. Mr. Olmo also assisted in the calculation of progress utilizing GIS tools build into the GIS system. FDOT District 4, Broward County Transit Bus Shelter Project, Broward County, Florida. This Design- Build project consists of providing ADA compliant bus shelters to 73 locations throughout the cities of Wilton Manors, Oakland Park and Pompano Beach, in Broward County. This project required the coordination between the design team consisting of civil engineers, structural engineers, electrical engineers, shelter manufacturer and our surveying team. Mr. Olmo assisted the field crew on this project by helping in the field data collection operation to be able to meet the strict schedule requirements set by the Design-Build Team. Water and Sewer Service Connection and Pump Station for Car Dealership, City of North Miami, FL – This project included the design of a new water and sewer connection for the development of a commercial site to house a new Car Dealership for Warren henry in North Miami, including the design of a new wastewater pump station rated at 65 gpm. Mr. Olmo conducted site verification services, including the location of above ground features, performed underground utility locations and recorded locations based on painted marking in the field. Mr. Olmo prepared CAD drawings depicting exiting conditions and proposed designs. Volume Determination Survey, Biscayne Landing, North Miami, FL. - Mr. Olmo has assisted as field data collector and has participated in the generation of CAD drawings for the collection of elevations required for the calculation of stock pile and lakes volumes within the boundaries of a mixed used development project currently under construction in North Miami known as Biscayne Landing. Project includes the collection of field data, location of benchmarks, generation of contours and volume calculations. NE 10th Street & NE 7th Avenue Improvements in Dania Beach, FL. Project consists of extension of NE 10th Street to the east to intersect with NE 7th Avenue and reconstruction of NE 7th Avenue from this intersection to the north to the intersection of Taylor Road. Project proposed water and sewer improvements along these roadway corridors. Tasks included topographic surveys, design of Civil plans, Utility coordination and worked with Broward County Environmental Regulation Division, Broward County Health Department and City of Dania Beach for Project permitting. Mr. Olmo was responsible for generation of As-Built drawings for water and sewer utilities on this project. 166 CARIDAD CALVO Project Controls EDUCATION Business Administration and Accounting – Miami-Dade Community College Accounting and Bookkeeping – Lindsey Hopkins Vocation Educational High School Diploma, Graduate – Miami Central High School FIELD OF SPECIALIZATION Procurement Management Data Entry Contracts Administration Accounting Accounts Payable Accounts Receivable Public Relations Knowledge of ADPICS & FAMIS Systems Knowledge of SAGE MAS, CIIS YEARS OF EXPEREINCE 35 Years EXPERIENCE SUMMARY Ms. Calvo is an Administrative Contracts Officer with a strong background and experience in procurement, accounting, project controls and administrative software systems currently in use by Miami-Dade County. Ms. Calvo has nearly 35 years of experience in the administrative field, with the Miami-Dade County, giving her extensive knowledge on operations, divisions, systems and day to day operations within the County departments. During her many years with the county, Ms. Calvo has become familiar with systems such as FAMIS, ADPICS, Transit Financial/Procurement EAMS, CIIS to name a few. In addition, Ms. Calvo is a dedicated worker capable of working as part of a team and proficient enough to be able to meet deadlines of independent tasks and duties without the need of extensive supervision. Below is a summary of Ms. Calvo’s relevant experience to this project. RELEVANT EXPERIENCE Administrative Officer, Miami-Dade Transit, Financial Services Division Project Included managing, posting and processing of Easy Card payment in SAGE System; an Electronic Accountings system that tracks receivables, plans cash flow, and provides extensive reporting features. Prepare invoices and billing from within Sage MAS 200 and create customer statements on demand. Responsibilities: • Manage and post all Account Receivable entries in MAS/Sage System • Enter credit card, cash, journal entries and wire transfer payments from various entities (Corporate Businesses, Hospitals, Colleges, Hotels and nonprofit Organization.) • Post credit memos and adjustment, • Provide customer assistance to our vendors and clients • File and maintain all corporate and sale outlet invoices and payment • Monthly Account reconciliation • Research, initiate and submit to collection delinquent accounts for Marketing and Easy Card vendors • Provide trouble shooting support to the Accounts Payable, Contract Payable, Grant Accounting, Materials Management, Right of Way and Planning and Engineering contracts Services Division. • Assist, test and coordinate the implementation of the Grant Restriction Indicator (GRI) Module for Transit in conjunction with the Finance Department and ISD, Procurement. • Provide auditing assistance in the Transit Grants Accounting Division with FDOT grant reimbursement project. Procurement Technician, Miami-Dade County Procurement Management, ADPICS Division Project duties included to Coordinate with the Finance Department and ITD user Departments security access based on job duties, this included creators of electronic documents and approvers based on threshold amount, Provided customer assistance to all ADPICS users by responding to questions posed by the departments during the implementation of the new Electronic Procurement System and (ADPIC) Advance Purchasing Inventory Control System. 167 CARIDAD CALVO Project Controls Contract Officer, Miami-Dade Transit, Engineering Contract Services Division Project Included assisting the Miami Dade Transit Department with staff training on Federal Transit Administration (FTA) processes and procedures used to comply with State and local laws as well as with Federal requirements. Provide assistance with procedures in processing FTA and State grants, contracts and procurement protocol in the necessary areas of MDT Engineering, Planning and Development’s Contract Services and Materials Management Division. Responsibilities: • Provide guidance and assistance to Miami-Dade Transit staff with compliance to FTA (Federal Transportation Administration) federal grant guideline to include MDT SOP’s (Standard Operating Procedures) for American Recovery & Reinvestment Act (ARRA) • Provide ADPICS and FAMIS training to Transit staff in the process of inquiring creating, and researching entries and payments related to State and Federal grants within the Construction, Finance and Procurement and Accounts Receivable Division • Meet with vendors to resolved outstanding contract issues and non-compliance. • Assist administrative staff with contract administration functions for Miami-Dade Transit’s Engineering, Planning and Development, Field Engineering, and Transit Facilities Maintenance Divisions. Contracts include Miscellaneous Construction Contracts, Major Construction Contracts, Professional Services Agreements and Design-Build Contracts, Change Orders, Amendments Supplemental Agreements. • Ensure contract compliance with Federal Transit Administration (FTA) Procurement Guidelines, Miami- Dade County Capital Improvement Information System, Advance Purchasing Inventory Control System and developing, implementing, and monitoring procurement policies and procedures. • Verify fiscal sources and budget availability in accordance with approved capital budget. Provide non- technical information, ensuring that all applicable Local, State and Federal requirements are included in the procurement documents. Provide assistance and guidance in creating purchase orders, change orders and Notice to proceed. • Perform quality control reviews of procurement files to ensure compliance with Federal, State, local standards and departmental policies and procedures. • Responded to requests for information from contractors during contract solicitation. Participate in negotiation meetings with contractors and consultants during the award of architectural and engineering and various construction contracts. • Responsibilities included regular use of the following Miami-Dade County database systems: Capital’s Improvement Information System (CIIS), Advance Purchasing Inventory Control System (ADPICS), Finance Accounting • Management System (FAMIS) and Sage MAS System a Transit’s Electronic Accounting Management System. Procurement Contracting Agent , Miami-Dade County Procurement Management, Bids and Contract Division - Project included Advanced procurement work in the purchase of commodities in a centralized operation for Miami-Dade County; Responsible for all phases pertaining to purchasing various commodities for user departments and user agencies. Assist developing specifications for formal and informal bids, analyzing and creating requisitions, preparing bid documents and bid evaluation recommendation packages, enforcing competitive procedures in accordance with established legal and procedural requirement. Responsibilities: • Provide purchasing guidance and assistance to all county departments and agencies. • Conduct extensive market research for changes in technology and the industry. • Interacting with Miami-Dade County departments, agencies and municipalities. • Review and process requisitions submitted by user departments and provide specific commodity assistance to user departments to establish blanket purchase orders. • Maintained contract workload. • Schedule department contract review, option to renews, and bid rejections. • Prepare required documents to submit acquisitions to Small Business Development (SBD) for Small Business Enterprise (SBE) vendor participation. • Prepare contract modifications for user departments to access contract or increase allocation. • Attend meetings, pre-bid conference and walk through with Senior Agents. • Create bid tabulation spreadsheets 168 ANDRES AMOEDO III Senior Appraiser EDUCATION Juris Doctor University of Miami School of Law, 2001 Bachelor’s in arts. Major in Political Science Minor in Criminal Justice Florida International University PROFESSIONAL LICENSES Attorney - Florida Bar Member No: 0625681 State Certified General Real Estate Appraiser License No: RZ2902 General Appraiser Instructor License No: GA1000156 Miami-Dade Appraiser Special Magistrate 2016-2017 Miami-Dade Appraiser Special Magistrate 2017-2018 FIELD OF SPECIALIZATION Attorney, Appraiser, Magistrate YEARS OF EXPERIENCE Over 16 Years EXPERIENCE SUMMARY Mr. Amoedo is an experienced Attorney at Law with a demonstrated history of working in the legal industry, with extensive experience in Real Estate including property appraisals and valuations. He is Skilled in negotiation, sales, entrepreneurship, and real property with a Doctor of Law (J.D.) from the University of Miami School of law. EXPERIENCE Florida Department of Transportation. Fort Lauderdale, FL. Right of Way Appraiser (1 year) •Review appraiser for the Office of Right of Way to help determine what the Department will offer land owners when their property is needed to be purchased through Eminent Domain as part of a transportation project. Miami-Dade Value Adjustment Board Miami, FL. Appraiser Special Magistrate (2 years) •Preside over property tax appeal hearings to determine if a property is properly assessed by the Miami-Dade Property Appraisers Office. Miami-Dade Appraisals Miami, FL. Owner, General Real Estate Appraiser (12 years) •FHA Approved Appraiser •Provide valuation services for residential, commercial and industrial properties. •Develop appraisal reports for general use, financing, estate and insurable value purposes. Appraisal Solutions of South Florida Doral, FL. Owner, State Certified Residential Real Estate Appraiser (12Years) •Inspected properties and provided significant assistance in the development of appraisal reports as a State-Registered Appraiser. •Performed complete appraisal assignments from client -intake to establishment of a final estimate of value as a State-Certified Appraiser. •Conducted market analysis, income and rental studies, and replacement cost estimates. AA Realty Mortgage & Investments Miami, FL. Assistant •Information gathering & research, data entry, comparable inspections and photographs. •Assisted in real estate sales, financing and appraisal related functions. 169 ANDRES AMOEDO III Senior Appraiser OTHER RELEVANT EXPERIENCE Amoedo Group Law, Miami, FL Engineer. Solo Practitioner Attorney (6 Years) • Primary area of practice in Foreclosure Defense and Auto Accident Law. • Other areas of practice include Landlord/Tenant conflicts, Property Tax Law, Pre-Construction Deposit Recovery, and Condo Association Collections and Disputes. • Prepare all pleadings, motions, written correspondence and forms. • Attend hearings on motions to dismiss, summary final judgments, cancellation of sales and other related foreclosure hearings. • Consult with clients, attend mediations and arbitrations. Mortgage Defense Group Miami Gardens, FL. Associate Attorney (2 Years) • Attorney of record for all foreclosure defense cases (200 +) • Attorney or record for all Chapter 7 and 13 Bankruptcy cases. Torres & Vadillo. Associate Attorney, Independent Contractor (1 Year) • Attend foreclosure hearings on a per diem basis. • Spent several months in-house handling foreclosure cases, contract related cases and property tax appeals. Andres Amoedo III, PA Miami, FL. Solo Practitioner Attorney (1 Year) • Represented both buyers and sellers through Real Estate closing transactions. • Prepared closing documents, reviewed Purchase & Sale Agreements, and provided Real Estate consultations. • Approved Agent Member of The Fund, Attorneys Title Services Bernstein & Maryanoff Miami, FL. Associate Attorney (1 Year) • Specialized in Personal Injury Protection Law. • Drafted pleadings and memorandums of law. • Attended daily hearings, depositions and examinations under oath. • Assisted senior attorneys in other personal injury related cases. APPRAISAL EDUCATION - 3-Hour Florida Appraisal Law Update, with Gold Coast Schools, in accordance with the requirements of the Florida Real Estate Appraisal Board, 3 hours (2018). - 5-Hour Back to Basics, with Gold Coast Schools, in accordance with the requirements of the Florida Real Estate Appraisal Board, 5 hours (2018). - 7-Hour Appraiser vs Form Filler, with Gold Coast Schools in accordance with the requirements of the Florida Real Estate Appraisal Board, 7 hours (2018). - 7-Hour Nation USPA Update, with Gold Coast Schools, in accordance with the requirements of the Florida Real Estate Appraisal Board, 7 hours (2018). - 8-Hour Neighborhood & Market Analysis, in accordance with the requirements of the Florida Real Estate Appraiser Board, 8 hours (2018). - Real Property Appraiser Special Magistrate Value Adjustment Board Training, in accordance with the Florida Department of Revenue, 8 modules (2017). - Real Property Appraiser Special Magistrate Value Adjustment Board Training, in accordance with the Florida Department of Revenue, 8 modules (2016). - Better to Be Safe Than Sorry, with Gold Coast Schools, in accordance with the requirements of the Florida Real Estate Appraiser Board, 7 hours (2016). - Appraisal Review of Residential Properties, with Gold Coast Schools, in accordance with the requirements of 170 ANDRES AMOEDO III Senior Appraiser the Florida Real Estate Appraiser Board, 6 hours (2016). - 2016-2017 USPAP 7-hour Update Course, with Gold Coast Schools, in accordance with the requirements of the Florida Real Estate Appraiser Board, 7 hours (2016). - Property & Valuation Analysis for FHA, with Gold Coast Schools, in accordance with the requirements of the Florida Real Estate Appraiser Board, 7 hours (2016). - Florida Appraisal Laws and Regulations, with McKissock Appraisal School, in accordance with the requirements of the Florida Real Estate Appraiser Board, 3 hours (2016). - FREC & FREAB Instructor Continuing Education Seminar with the Division of Real Estate, in accordance with the requirements of the Florida Real Estate Appraiser Board, 10 hours (2016). - Appraising Green Residences, with Gold Coast Schools, in accordance with the requirements of the Florida Real Estate Appraisal Board, 7 hours (2014). - Florida Appraisal Law Update, with Gold Coast Schools, in accordance with the requirements of the Florida Real Estate Appraisal Board, 3 hours (2014). - Defensible Appraisal Practices, with Gold Coast Schools, in accordance with the requirements of the Florida Real Estate Appraisal Board, 6 hours (2014). - ANSI, Measurements & the Price-Per-Square-Foot, with Gold Coast Schools, in accordance with the requirements of the Florida Real Estate Appraisal Board, 7 hours (2014). - Florida Real Estate Appraisal Law and Rules, with Gold Coast Schools, in accordance with the requirements of the Florida Real Estate Appraisal Board, 3 hours (2012). - Foreclosure Basics for Appraisers, with Gold Coast Schools, in accordance with the requirements of the Florida Real Estate Appraisal Board, 7 hours (2012). - Challenging Assignments for Residential Appraisers, with Gold Coast Schools, in accordance with the requirements of the Florida Real Estate Appraisal Board, 6 hours (2012). - Appraisal of 2-4 Family and Multi-Family Properties, with Gold Coast Schools, in accordance with the requirements of the Florida Real Estate Appraisal Board, 7 hours (2012). - 2012-2013 7-Hour Equivalent USPAP Update Courts, with Gold Coast Schools, in accordance with the requirements of the Florida Real Estate Appraisal Board, 7 hours (2012). - Florida Real Estate Appraisal Laws, with Gold Coast Schools, in accordance with the requirements of the Real Estate Appraisal Commission, 3 hours (2010). - Florida Supervisor Trainee Roles & Relationship, with Gold Coast Schools, in accordance with the requirements of the Real Estate Appraisal Commission, 3 hours (2010). - Introduction to Commercial Appraisals, with Gold Coast Schools, in accordance with the requirements of the Real Estate Appraisal Commission, 2 hours (2010). - FHA & VA Appraisal Basics, with Gold Coast Schools, in accordance with the requirements of the Real Estate Appraisal Commission, 7 hours (2010). - Mortgage Fraud a Dangerous Business, with Gold Coast Schools, in accordance with the requirements of the Real Estate Appraisal Commission, 7 hours (2010). - National USPAP Update, with Gold Coast Schools, in accordance with the requirements of the Real Estate Appraisal Commission, 7 hours (2010). - Advanced Residential Applications, with Gold Coast Schools, in accordance with the requirements of the Real Estate Appraisal Commission, 17 hours (2008). - National USPAP Course, with Gold Coast Professional Schools, in accordance with the requirements of the Real Estate Appraisal Commission, 7 hours (2008). - Florida Appraisal Law Update, with Gold Coast Professional Schools, in accordance with the requirements of the Real Estate Appraisal Commission, 3 hours (2008). - Supervisor/Trainee Roles & Relationships, with Gold Coast Professional Schools, in accordance with the requirements of the Real Estate Appraisal Commission, 3 hours (2008). - National USPAP Course, with Gold Coast Professional Schools, in accordance with the requirements of the Florida Real Estate Appraisal Board, 15 hours (2005). - Principles of Interior Inspections for Appraisers, with Gold Coast Professional Schools, in accordance with the requirements of the Florida Real Estate Appraisal Board, 10 hours (2004). - FHA Handbook 4150.2, with Gold Coast Professional Schools, in accordance with the requirements of the Florida Real Estate Appraisal Board, 10 hours (2004). - Florida Appraisal Law Update, with Gold Coast Professional Schools, in accordance with the requirements of the Florida Real Estate Appraisal Board, 3 hours (2004). - National USPAP Update, with Gold Coast Professional Schools, in accordance with the requirements of the Florida Real Estate Appraisal Board, 7 hours (2004). 171 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Luis J. Jurado, P.E. 13. ROLE IN THIS CONTRACT Civil Engineering QA/QC 14. YEARS EXPERIENCE a. TOTAL 17 b. WITH CURRENT FIRM 13 15. FIRM NAME AND LOCATION (City and State) Premiere Design Solutions, Inc. – North Miami, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) B.S. Civil Engineering, University of North Carolina at Charlotte 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Engineer Florida No.66396 - South Carolina No. 28394 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Florida Engineering Society, National Society of Professional Engineers, ASCE Member 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Broward County Transit – Professional Services Agreement in an Ongoing Basis, Broward County, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. Jurado was Project Manager and designed over 1,000 bus stops including but not limited to bus stops, bus shelters, bus bays, bike lanes, curb and gutter, landing pads, sidewalk connectors, new sidewalks, handicap ramps, stormwater improvements and bus shelter pads. In addition, Mr. Jurado prepared paving, grading and drainage plans to depict proper stormwater conveyance and retention as per the proposed improvements. The utility coordination for this project was very rigorous since many of the bus stops were located within high dense urban areas with reduced right-of-way space. b. (1) TITLE AND LOCATION (City and State) FDOT Minor Highway Transit Enhancements, Broward County, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION (If applicable) 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Project included design services, permitting and construction management services for the improvement at 73 locations along FDOT right-of-way in Broward County, FL. This Design-Build Project included the enhancement of transit facilities, including ADA improvements, utility coordination, civil design, permitting and construction inspections. This project also included the design of custom made state of the art bus shelter facilities to replace exiting or be added at these locations. Mr. Jurado was responsible for presenting a work program to ensure completion within the expected Client’s schedule, project team coordination and rigorous quality control. The project total cost was $2.5 Million. c. (1) TITLE AND LOCATION (City and State) FLL Westside Watermain Loop, Broward County Aviation Department, Broward County, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) 2020 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm This water main project was following the Water System Master Plan and was designed by Mr. Jurado as Engineer of Record. Project included the design, permit and Engineering support for the construction of those improvements that this area of the airport requires; consistent with the Water System Master Plan. Design included over 5,000 LF of 16 and 12-inch diameter DIP water mains, with taps, air release valves, pavement restoration including airside concrete apron restoration and all the required coordination. Mr. Jurado also led and supervised engineering during construction services including the preparation of record drawings and final project certification and closeout. d. (1) TITLE AND LOCATION (City and State) Pembroke Pines City Hall and Civic Center, City of Pembroke Pines, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (If applicable) 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. Jurado was Civil Engineer and prepared engineering drawings for this 115 Acre project development in the City of Pembroke Pines. Project delivered the City Center a mixture of residential, commercial and office facilities. The site is located within one of the busiest corridors within Broward County. The Pembroke Pines City Hall and Civic Center is currently under construction and will be located in the middle of the City Center with access to all the facilities. The site, located on 10-acres will provided the community with a City Hall and Civic Center Building, and Commission Chambers Building for public meetings and an Art Gallery Building. Construction Cost: $60M. e. (1) TITLE AND LOCATION (City and State) Taylor Lane Roadway Improvements, Dania Beach, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2014 CONSTRUCTION (If applicable) 2016 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. Jurado was the Engineer of Record for this project to provide design, permitting and engineering services during construction for the development of a drainage system to help alleviate flooding of this city roadway from stormwater run-off. The project was designed by PDS and permits were obtained from the local governmental agencies. Mr. Jurado’s design included the development of drainage improvements within the roadway and the development of a dry retention area to collect the stormwater run-off from the roadway. PDS was involved in the contractor selection, overseeing the preparation of the contract and ultimate completion of the improvements. 172 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Gustavo A. Eckardt. P.E. 13. ROLE IN THIS CONTRACT Project Manager 14. YEARS EXPERIENCE a. TOTAL 18 b. WITH CURRENT FIRM 10 15. FIRM NAME AND LOCATION (City and State) Premiere Design Solutions, Inc. – North Miami, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) B.S. Civil Engineering, University of North Carolina at Charlotte 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Engineer Florida No.67553 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Florida Engineering Society, Chi Epsilon Civil Engineering Honor Society, National Society of Professional Engineers, Primavera P3 Scheduling Training, MOT Training Course 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Hard Rock Stadium Pedestrian Bridges and Tunnels, City of Miami Gardens, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) 2020 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. Eckardt was the project manager and engineer of record for this project which the preparation of specific purpose surveys at four locations at the Hard Rock Stadium, drainage design and underground utility investigation and design. The project had a very aggressive schedule, requiring to build two pedestrian bridges and two pedestrian tunnels at the Stadium in anticipation of the Superbowl LIV. Project also included the drafting and preparation of legal description and sketches for the dedication of land and aerial easements for the new structures in private property. The project total cost is $16 Millions. b. (1) TITLE AND LOCATION (City and State) Miami-Dade Transit Department, ARRA Municipalities Shelters Groups “A & C”, Miami-Dade County, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2012 CONSTRUCTION (If applicable) 2015 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Project consisted of two transit improvement projects at over 70 locations throughout Miami-Dade County, in the Cities of Homestead, Florida City, North Miami, North Miami Beach, Miami Lakes, Surfside, Bay Harbor Islands, Aventura, South Miami, Opa-Locka, and El Portal. Project was Federally Funded and coordinated by the Miami- Dade Transit Department, and follows all ARRA and Federal guidelines and regulations. Mr. Eckardt was the Construction Manager and Quality Control representative in the project, and assisted in obtaining all permitting approvals from municipalities and county agencies. Project included the ADA accessibility and pedestrian safety improvements to bus stop locations, new bus shelters and amenities, new sidewalk and reinforced concrete pads. c. (1) TITLE AND LOCATION (City and State) MDT A/E Professional Consultant Services for Federally Funded Projects, Miami-Dade County Transit, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. Eckardt is the Consultant Project Manager in this multi-year contract for Continuous Professional Services for Federally Funded Projects, to develop transit facilities funded through the Federal Transit Administration (FTA). The scope of work includes but is not limited to: technical and operation planning, transit studies, environmental impact statements, permitting, surveying, fire/life/safety consulting, cost estimating, structural, geotechnical, industrial, electrical, MEP, architecture, transit and transportation planning in accordance with FTA requirements, design criteria, support negotiation of full funding grant agreements, plan & specification reviews, design of new transit facilities, construction engineering and inspections, value engineering, project cost estimates and traffic studies. d. (1) TITLE AND LOCATION (City and State) Miami Executive Airport RIM Taxiway Modifications, Miami-Dade Aviation Department, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (If applicable) 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. Eckardt is the project manager for this project to design modifications to the existing configuration of Taxiways “A” and “D” as they intersect and approach Runways 9L and 13 at the west terminus of the Airport. Mr. Eckardt has been responsible for design and coordination of demolition plans, new pavement design, runway and taxiway lighting design, pavement markings and signage, stormwater pollution prevention plans, construction phasing and staging, access route designation. Mr. Eckardt provided construction administration support until closeout. e. (1) TITLE AND LOCATION (City and State) FDOT Minor Highway Transit Enhancements, Broward County, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION (If applicable) 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Project included design services, permitting and construction management services for the improvement at 73 locations along FDOT right-of-way in Broward County, FL. This Design-Build Project included the enhancement of transit facilities, including ADA improvements, utility coordination, civil design, permitting and construction inspections. This project also included the design of custom made state of the art bus shelter facilities to replace exiting or be added at these locations. Mr. Eckardt was the project manager responsible for completing designs and coordinating subconsultants and prepare submittals and address permitting comments. The project total cost was $2.5 Million. 173 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Henry Rivera 13. ROLE IN THIS CONTRACT CADD Manager 14. YEARS EXPERIENCE a. TOTAL 40 b. WITH CURRENT FIRM 12 15. FIRM NAME AND LOCATION (City and State) Premiere Design Solutions, Inc. – North Miami, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) B.S. Industrial Engineering, Santander Industrial University, Bucaramanga, Colombia 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Master of Science in Industrial Engineering, University of Pittsburgh, 1978 Master of Science in Mathematical Statistics University of Chile, Santiago de Chile, Chile 1971 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Broward County Transit – Professional Services Agreement in an Ongoing Basis, Broward County, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm This project is a multi-year project consisting of designing Transit Improvements throughout Broward County that are to be compliant with ADA guidelines and regulations. One of the main objectives of the program is to provide ADA accessibility to thousands of bus stops within the County. The project includes surveying, engineering design for improvements such as landing pads, shelter pads, curb & gutter, sidewalk restoration, sidewalk transitions, etc. Mr. Rivera’s duties and responsibilities include the preparation of topographic surveys and hundredths of locations and assist with the computer generated drawings and engineering design drawings utilizing AutoCAD Civil 3D. b. (1) TITLE AND LOCATION (City and State) Sidewalk Assessment and GIS Representation, City of Fort Lauderdale, Broward County (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm This project consisted in field data collection and assessment of the existing condition of all the existing sidewalks within the City of Fort Lauderdale, which consists of over 400 miles of concrete sidewalks. Mr. Rivera was responsible for field data collection utilizing GPS devices, with picture taking capabilities, that would later sync data collected with the GIS application developed for this project. Mr. Rivera conducted staff training on new data collection devices and personally assisted in the calculation of progress utilizing GIS tools build into the GIS application. c. (1) TITLE AND LOCATION (City and State) FDOT District 4, Broward County Transit Bus Shelter Project, Broward County, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION (If applicable) 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm This Design-Build project consists of providing ADA compliant bus shelters to 73 locations throughout the cities of Wilton Manors, Oakland Park and Pompano Beach, in Broward County. Mr. Rivera was the CAD Manager on this project responsible for setting up all drawings on this project, including topographic surveys and engineering drawings. This project required the coordination between the design team consisting of civil engineers, structural engineers, electrical engineers, shelter manufacturer and our surveying team. Mr. Rivera also assisted the field crew on this project by helping in the field data collection operation to be able to meet the strict schedule requirements set by the Design-Build Team and also in the preparation of design drawing using Autcad software. d. (1) TITLE AND LOCATION (City and State) Pembroke Pines City Hall and Civic Center, City of Pembroke Pines, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (If applicable) 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. Rivera prepared all the CAD drawings for this 115 Acre project development in the City of Pembroke Pines. Project delivered the City Center a mixture of residential, commercial and office facilities. The site is located within one of the busiest corridors within Broward County. The Pembroke Pines City Hall and Civic Center is currently under construction and will be located in the middle of the City Center with access to all the facilities. The site, located on 10-acres will provided the community with a City Hall and Civic Center Building, and Commission Chambers Building for public meetings and an Art Gallery Building. Construction Cost: $60M. e. (1) TITLE AND LOCATION (City and State) Runway Incursion Mitigation (Taxiways A & D) Miami Executive Airport (TMB), Miami-Dade Aviation Department, Miami FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (If applicable) 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. Rivera was the CAD Manager in this project to mitigate the runway incursion potential. The future airport layout plan included the reconfiguration of Taxiways “A” and “D” at the entrance points to Runways 9L and 13 to eliminate the wide expansive pavement. Mr. Rivera used data points from survey to create Digital Terrain Model to be used in grading calculations in design plans. Mr. Rivera prepared grading, drainage, pavement marking and signage, staging and SWPPP plans. 174 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Jason McKoy 13. ROLE IN THIS CONTRACT Project Engineer 14. YEARS EXPERIENCE a. TOTAL 12 b. WITH CURRENT FIRM 5 15. FIRM NAME AND LOCATION (City and State) Premiere Design Solutions, Inc. – North Miami, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) Masters in Architectural Professional Studies, Leeds Metropolitan University, Leeds, UK 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Registered Architect A.R.B. UK – No. 072168l 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Btec National Diploma in Computer Graphic Design, The Sheffield College 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Hard Rock Stadium Pedestrian Bridges and Tunnels, City of Miami Gardens, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) 2020 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. McKoy assisted in this project which the preparation of drainage design and underground utility investigation and design. The project had a very aggressive schedule, requiring to build two pedestrian bridges and two pedestrian tunnels at the Stadium in anticipation of the Superbowl LIV. Project also included the drafting and preparation of legal description and sketches for the dedication of land and aerial easements for the new structures in private property. The project total cost is $16 Millions. b. (1) TITLE AND LOCATION (City and State) FLL Westside Watermain Loop, Broward County Aviation Department, Broward County, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) 2020 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm This water main project was following the Water System Master Plan and was designed by Mr. McKoy was the RPR (resident project representative) and provided full time inspections and construction administration services, including responsible of all coordination of work between different department of Miami Dade Aviation Department, FAA and the contractor. Mr. McKoy inspected installation of over 5,000 LF of 16 and 12-inch diameter DIP water mains, with taps, air release valves, asphalt pavement restoration including airside concrete apron restoration and all the required coordination. Mr. McKoy also participated in the preparation of record drawings and final project certification, punch-list and closeout. c. (1) TITLE AND LOCATION (City and State) CBIS/CBRA/BHS Program Civil Engineering at Miami International Airport, Miami-Dade Aviation Department, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm The South and Central Terminals (CBIS) / Checked Baggage Reconciliation Areas (CBRA) / Baggage Handling System (BHS) Program is a part of a $160 Million dollar program to centralize all baggage operations of these two terminals in a new modern facility. The Engineering phase, estimated at $1.6 Million included a new 4 Stories-70,000 SF building, and necessary modifications to the Central and South Terminals to accommodate the new Baggage systems. Mr. Mckoy assisted in the Construction Management for the civil component of the program. Tasks completed included the design and inspection of new water and sewer services for the building, underground utility coordination, concrete pavement design, pavement markings, signage, and maintenance of traffic. Project also included necessary civil coordination for the design and inspection of a temporary baggage make-up device requiring a 12” fire line relocation, new monitoring wells, and cleanout relocation. d. (1) TITLE AND LOCATION (City and State) Broward County Transit – Professional Services Agreement in an Ongoing Basis, Broward County, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. McKoy was Project Manager working at Broward County as in-house staff overseeing and scheduling work for the development and construction of over 1,000 bus stops including but not limited to bus stops, bus shelters, bus bays, bike lanes, curb and gutter, landing pads, sidewalk connectors, new sidewalks, handicap ramps, stormwater improvements and bus shelter pads. In addition, Mr. Jurado prepared paving, grading and drainage plans to depict proper stormwater conveyance and retention as per the proposed improvements. The utility coordination for this project was very rigorous since many of the bus stops were located within high dense urban areas with reduced right-of-way space. e. (1) TITLE AND LOCATION (City and State) North Perry Airport Park and Ride Facility, Pembroke Pines, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2014 CONSTRUCTION (If applicable) 2015 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. McKoy served as the Project Construction Manager for the development of a Park and Ride Facility at the North Perry Airport located on the northeast corner of Pembroke Road and University Drive in the City of Pembroke Pines. The site development included the design of the parking facility including a drainage and lighting system to serve riders of the Broward County Transit System, and a reconfiguration of the parking lot. Mr. McKoy was responsible for the coordination of permitting with the local governmental agencies and overseeing construction of this facility for Broward County Transit and the City of Pembroke Pines. Project was fast track and required expedited completion to secure federal funds. 175 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 1 21. TITLE AND LOCATION (City and State) Pembroke Pines City Hall and Civic Center, City of Pembroke Pines, FL , 22. YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (If applicable) 2019 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER The City of Pembroke Pines b. POINT OF CONTACT NAME Matthew Larson c.POINT OF CONTACT TELEPHONE NUMBER 954-434-5252 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Premiere Design Solutions, Inc. (2) FIRM LOCATION (City and State) Miramar, FL (3) ROLE Professional Engineering and Permitting Services b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The Pembroke Pines City Center is a 115-acre development that is currently under construction in the City of Pembroke Pines. Upon completion, the City Center will have a mixture of residential, commercial and office facilities. The site is located within one of the busiest corridors within Broward County. The Pembroke Pines City Hall and Civic Center is currently under construction and will be located in the middle of the City Center with access to all the facilities. The site, located on 10-acres will provide the community with a City Hall and Civic Center Building, and Commission Chambers Building for public meetings and an Art Gallery Building. Construction Cost: $60M. Premiere Design Solutions Staff’s role in the project is: Lead Civil Engineer and Project Manager for the on-site and off-site pavement, drainage, potable water and sanitary sewer systems. Assisted with the preparation of the Site Plan for the site for approval with the City of Pembroke Pines staff and Commission. Obtained on-site and off-site permits with Pembroke Pines Engineering, South Broward Drainage District, South Florida Water Management District, Broward County Health Department and Broward County Environmental Resource Management. Provided overall 115-acre City Center design, permitting and construction oversight. Services performed by PDS staff: Professional Site Civil Engineering Regulatory Agency permitting Construction engineering inspections 176 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 2 21. TITLE AND LOCATION (City and State) A/E Professional Consultant Services for Federally Funded Projects 22. YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (If applicable) N/A 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER Miami-Dade Transit b. POINT OF CONTACT NAME Jesus Valderrama c. POINT OF CONTACT TELEPHONE NUMBER 786-469-5291 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Premiere Design Solutions, Inc. (2) FIRM LOCATION (City and State) North Miami, FL (3) ROLE Transit Planning, ROW Support, GIS, Inspections, Design & Surveying b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Premiere Design Solutions, Inc. (PDS) currently serves as the Prime Consulting Firm for Miami-Dade Transit (MDT). MDT is the 14th largest public transit system in the USA, and the largest transit agency in the state of Florida. MDT operates a transportation system which consists of four major components: the Metrobus fleet, connecting most areas of Miami-Dade County; Metrorail, an electrically-powered, elevated, rapid-transit heavy rail system stretching 24.6 miles; Metromover, a 4.4-mile elevated people mover that serves the downtown central business district of Miami; Special Transportation Service (STS), designed to meet the needs of people with disabilities unable to use regular transit services. Overall, MDT moves over 353,000 daily (weekday) boardings on Metrobus, Metrorail, Metromover and STS combined. PDS is the prime consultant on this multi-year contract for Continuous Professional Services for Federally Funded Projects, to develop transit facilities funded through the Federal Transit Administration (FTA). The scope of work includes but is not limited to: technical and operation planning, transit studies, environmental impact statements, permitting, surveying, fire/life/safety consulting, cost estimating, structural, geotechnical, industrial, electrical, systems and mechanical engineering, architecture, transit and transportation planning in accordance with FTA requirements, design criteria, support negotiation of full funding grant agreements, plan & specification reviews, design of new transit facilities, construction engineering and inspections, value engineering, project cost estimates and traffic studies. Premiere Design Solution’s Completed Work Orders Under this Contract Included: •Construction Contracts & Procurement Support Services – Included Buy America Interpretation for Construction Contracts; An internal audit to procurement files to ensure FTA requirements are being met; & Change Order Drafting support services in compliance with FTA. •Existing Lease Management & Transit Oriented Development Support Services – Support to ROW Division to Manage leases on existing transit properties and support to new private transit oriented developments. •Independent Peer Review for Pedestrian Overpass – Design Review of a Steel Pedestrian Bridge over US-1 at University Metrorail Station. •Central Bus Garage Roofing Repairs and Bathroom Renovations – Condition Assessment, Design and Construction Support services for roofing and Bathroom improvements •SR 836 Express Planning Support – Planning services for the update of the Categorical Exclusion document, traffic analysis for the impact associated with the new terminal at FIU and Intersection analysis for the implementation of Traffic Signal Priority and Queue Jumps. •Bus Service and Design Standards – Planning support for the development of MDT Bus Service standards, creating service classes, and the development of Design drawings for MDT standard stops and facilities. Project also includes the generation of a series of Transit maps in GIS system. •Park and Ride at SW 344 Street and the Busway – Performed periodic inspection, construction management and Special inspector as required by the City of Florida City. 177 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 3 21. TITLE AND LOCATION (City and State) Hard Rock Stadium Pedestrian Bridges and Tunnels, City of Miami Gardens, Florida. 22. YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) 2020 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Miami Gardens. b. POINT OF CONTACT NAME Brenton Daily, P.E. Bentley Architects + Engineers, Inc. – Prime Consultant. c. POINT OF CONTACT TELEPHONE NUMBER (407) 331-6116 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Premiere Design Solutions, Inc. (2) FIRM LOCATION (City and State) North Miami, FL. (3) ROLE Civil Engineering and Surveying Services b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The City of Miami Gardens has engaged a Design/Build firm to design, permit and construct pedestrian improvements at the Hard Rock Stadium in the City of Miami Gardens, which shall be complete prior to a big event scheduled for February 2, 2020, with a total project cost of $16,000,000. Proposed pedestrian prefabricated metal bridge, fully enclosed with galvanized mesh, with minimum clearance of 17.5’, a span of approximately 145’, height of 15’ and 15’ of inside clear width, with concrete ramps and steps to provide ingress and egress to proposed pedestrian overpass. Proposed ramps and steps will be constructed in private land, which access to the public will be uninterrupted, open 24 hours a day and an easement granted to the City of Miami Gardens to place proposed ramps in public land. Premiere Design Solutions Staff’s Task in the project is: Topographic Survey Easement Preparation and Coordination Stormwater Management Design Permitting Utility Design and Coordination. 178 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 4 21. TITLE AND LOCATION (City and State) Various Roadway Intersection Surveys 22. YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) N/A 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Fort Lauderdale b. POINT OF CONTACT NAME Victor Herrera, PE c. POINT OF CONTACT TELEPHONE NUMBER 786-412-4447 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Premiere Design Solutions, Inc. (2) FIRM LOCATION (City and State) North Miami, FL (3) ROLE GIS, Condition Assessment & Surveying b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The City of Fort Lauderdale is committed to being a fully connected city of tomorrow by 2035. This can only be achieved by providing safe, convenient, accessible, and comfortable connections. The 2013 Neighbor Survey results indicated that 52% of residents are satisfied with the availability of sidewalks in the City. Additionally, 29% of the residents responded that the maintenance of streets, sidewalks and infrastructure should receive the most emphasis from City leaders over the next two years. As part of the comprehensive effort to address resident’s concerns, the City has embarked on a citywide Sidewalk Assessment Program, utilizing a continuing services consultant contract with Atkins. Work performed under the consultant task order included a GIS inventory of all 420 miles of City-owned sidewalks and an interactive report with sidewalk deficiency, photo and GIS location, type, and length of damage. Premiere Design Solution’s role in the project: Equipment Coordination and Staff Training Project Scheduling and performance tracking Existing sidewalk condition assessment using GPS and Camera Equipped data collectors Assessment included ADA deficiencies and condition verification QA/QC of data collected and Coordinated re-assessment of data as required Premiere Design Solutions, Inc (PDS) served as a sub-consultant to ATKINS on this program and was responsible for providing all of the filed inspection and sidewalk condition assessment of the 420 miles of city sidewalks. Work included the coordination and training of field staff in the use of project equipment, such as the Trimble Geo 7 Series and the criteria dictated by the client in the categorization, prioritization and levels required by the project. Assessment included the identification of ADA non-conformances, unsafe sidewalks, cracks and damages. PDS also provided scheduling and coordination of field crews conducting the condition assessment in order to meet the client’s delivery schedule. Data collected was uploaded to the Clients Server for report generation. PDS also conducted Quality Control on data collected, reports and images, and conducted verification of flagged areas. 179 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 5 21. TITLE AND LOCATION (City and State) CBIS/CBRA/BHS Program Civil Engineering, Miami, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) 2019 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER Miami-Dade Aviation Department b. POINT OF CONTACT NAME Ricardo Solorzano c. POINT OF CONTACT TELEPHONE NUMBER 305-876-7809 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Premiere Design Solutions, Inc. (2) FIRM LOCATION (City and State) North Miami, FL. (3) ROLE Civil Engineering Services & Surveying Services b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The CBIS/CBRA/BHS at Miami International Airport (MIA), procured by the Miami-Dade Aviation Department consists of modifications to the South and Central Terminals Checked Baggage Inspection Systems (CBIS) / Checked Baggage Reconciliation Areas (CBRA) / and Baggage Handling System (BHS). The program is part of a $150 Million dollar program to centralize and upgrade all baggage operations of these two terminals into a new modern facility for screening, transporting and new baggage handling equipment at the Miami International Airport, one of the busiest airports in the United States and the World. The Engineering phase, included a new 4 Stories-70,000 SF building, located between Concourses G and H with a pedestrian connector between these two concourses, and all the necessary modifications to the Central and South Terminals to accommodate the new Baggage Handling equipment and systems. Premiere Design Solutions, Inc. (PDS) was responsible for the Civil Engineering component of the program and trough PDS’ participation and constant coordination, project was completed within the anticipated delivery schedule. Premiere Design Solution’s role in the project is: Engineering Design of new water and sewer connections for proposed building Surveying Support Services Civil and underground utilities demolition and underground utility relocation coordination Stormwater Management system design and modifications Fuel Line Abandonment plans Rigid Pavement demolition and restoration design Pavement Marking and Signage Design Maintenance of Vehicular and Tug Drive Traffic Fire line Relocation design (12” DIP Water Main) Monitoring Well Relocation Support Civil design services for Temporary Make-up Baggage devices Permitting Coordination Construction Management and Engineering during construction services. 180 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 6 21. TITLE AND LOCATION (City and State) West Side Water Main Loop, Fort Lauderdale, Fl. 22. YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) 2020 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER Broward County Aviation Department (BCAD) b. POINT OF CONTACT NAME Alex Lazowick – President – Keith & Associates c. POINT OF CONTACT TELEPHONE NUMBER 954-788-3400 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Premiere Design Solutions, Inc. (2) FIRM LOCATION (City and State) Miramar, FL. (3) ROLE Civil Engineering, Permitting, Construction Management b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The Project is generally described as follows: design, permitting, bidding and construction phase services for the installation of 16 and 12 inch water main loop that will loop the west, north and east sides of the expanded lease parcels that are south of Taxiway C west and north of Lee Wagner Boulevard. This water main upgrade is required in accordance with the Water System Master Plan prepared by EAC Consulting, Inc. This project included the design, permitting and full time Engineering support for the construction of those improvements that this area of the airport required. This project is also known as phase two of the West Water Main, being an extension of a recently installed phase one West Water Main improvements to the South of this project. The Scope of work of this project includes the following task: Coordination with County and Government to expedite the project. Design and Permitting of the water main system. Utility locating services to meet local system criteria Provide Engineering Services during construction to certify the completion of the project Premiere Design Solutions Staff’s role in the project is: General civil engineering services. Obtaining Engineering Permits for the project. Bidding and awards services. Construction Management and Engineering during construction services. Full time inspections Project Closeout and record drawing preparation 181 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 7 21. TITLE AND LOCATION (City and State) Runway Incursion Mitigation (Taxiways A & D) Miami Executive Airport (TMB), Miami Fl. 22. YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (If applicable) 2019 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER Miami-Dade Aviation Department b. POINT OF CONTACT NAME Alejandro Montalvo c.POINT OF CONTACT TELEPHONE NUMBER (305) 876-7513 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Premiere Design Solutions, Inc. (2) FIRM LOCATION (City and State) North Miami, FL. (3) ROLE Civil Engineering and Surveying Services b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The project site is within the Miami Executive Airport (TMB), formerly known as the Kendall-Tamiami Airport owned and maintained by the Miami-Dade Aviation Department (MDAD), on the northwest corner of the airfield at the approach ends of Runways 9L and 13. The scope of work involved the preparation of plans and specifications necessary to modify TMB Taxiways “A” and “D” wide expansive pavement to a reduced width size to accommodate Airplane Design Group (ADG) III aircraft. This project is in response to FAA’s identifying this segment of the airfield under the FAA Runway Incursion Mitigation (RIM) Program. Airfield geometry has been identified as a primary contributing factor for runway incursion in this case. To address these existing issues, the FAA has initiated a comprehensive multi-year RIM program to identify, prioritize, and develop strategies to help airport sponsors mitigate risk at these locations. PDS was the Prime Consultant on this project to mitigate the runway incursion potential. The future airport layout plan includes the reconfiguration of Taxiways “A” and “D” at the entrance points to Runways 9L and 13 to eliminate the wide expansive pavement. The proposed reconfiguration coordinated and agreed to between the Air Traffic Control (ATC) and MDAD Operations, reduces the overall width while also decoupling these two taxiways. This would, however warrant the need to construct a new connector taxiway and adjacent holding bay but these features are not part of this project. This work includes the reduction of taxiway pavement widths, connection to Runways 9L and 13 and related work. Premiere Design Solution’s role in the project was: Topographic Survey Civil Engineering and Stormwater Management measures Pavement design, demolition and reconfiguration SWPPP and SWPP Report Existing lighting modifications and proposed taxiway and runway lighting design Construction Phasing Coordination and Staging area determination General site configuration and modifications Estimate of Construction Cost Construction Management and Inspections 182 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 8 21. TITLE AND LOCATION (City and State) Broward County Transit – Professional Services Agreement in an Ongoing Basis, Broward County, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) 2019 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER Broward County Transit b. POINT OF CONTACT NAME Arethia Douglas, P.E. c. POINT OF CONTACT TELEPHONE NUMBER 954-357-8375 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Premiere Design Solutions, Inc. (2) FIRM LOCATION (City and State) North Miami, FL (3) ROLE Civil Design, Permitting & Surveying b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Premiere Design Solutions, Inc (PDS) served as the prime consultant responsible for providing professional engineering, surveying and permitting services to the Broward County Transit Department (BCTD) for ADA improvements for transit facilities and new bus shelters at thousands of locations throughout Broward County, Florida. PDS’s responsibilities for this project included preparation of surveys, site condition assessments, geotechnical investigations, civil engineering design, structural engineering design, landscape design, electrical and photometric design, permit preparation and processing, modification of permits acquired by the BCTD, maintenance of traffic plans, utility relocations coordination and construction management. The PDS professional staff designed over 1,000 bus stops including but not limited to bus stops, bus shelters, bus bays, bike lanes, curb and gutter, landing pads, sidewalk connectors, new sidewalks, handicap ramps, stormwater improvements and bus shelter pads. In addition, PDS prepared paving, grading and drainage plans to depict proper stormwater conveyance and retention as per the proposed improvements. The utility coordination for this project was very rigorous since many of the bus stops were located within high dense urban areas with reduced right-of-way space. In order to accommodate the proposed improvements, PDS successfully relocated or coordinated relocations of many utilities including potable water, wastewater, electrical, traffic, power, telecommunications, and others. 183 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 9 21. TITLE AND LOCATION (City and State) FDOT Minor Highway Transit Enhancements, Broward County, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION (If applicable) 2013 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER FDOT District 4 b. POINT OF CONTACT NAME Scott Peterson, P.E. c. POINT OF CONTACT TELEPHONE NUMBER 954-777-4416 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Premiere Design Solutions, Inc. (2) FIRM LOCATION (City and State) Weston, FL (3) ROLE Planning, Civil Engineering, Permitting, Surveying & Construction Support b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The FDOT Bus Shelter project is a project consisting of providing ADA compliant Bus Shelters and Transit Improvements to 73 locations throughout the cities of Wilton Manors, Oakland Park and Pompano Beach, all located in Broward County, FL while ensuring the conditions of the existing and proposed bus stops to be compliant with ADA guidelines and regulations. Premiere Design Solutions, Inc. (PDS) was the prime Planner and Designer in this 2.5 Million Design Build Project. The project scope included planning, civil, structural and electrical engineering design for the bus shelters to be installed at the current locations, as well as improvements at bus stops such as landing pads, curb & gutter, drainage improvements, utility coordination, sidewalk restoration, sidewalk transitions, and amenities such as benches, trash cans, solar panels, etc. PDS was also responsible for all utility coordination for this project and coordinated the design team consisting of civil engineers, structural engineers, electrical engineers and a surveying team. Duties included scheduling, permitting and quality control review prior to submittal, meeting with governmental agencies having jurisdiction over the project site location to discuss permitting requirements and issues. Project also included topographic surveys and As-Bults of completed improvements. 184 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 10 21. TITLE AND LOCATION (City and State) Taylor Lane Roadway Improvements, Dania Beach, Fl. 22. YEAR COMPLETED PROFESSIONAL SERVICES 2014 CONSTRUCTION (If applicable) 2016 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Dania Beach b. POINT OF CONTACT NAME Ronnie Navarro, PE. c.POINT OF CONTACT TELEPHONE NUMBER 954-924-6808 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Premiere Design Solutions, Inc. (2) FIRM LOCATION (City and State) North Miami, FL. (3) ROLE Site Engineering – Water and Sewer b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Taylor Lane is a 2,000 linear foot section of roadway located in the City of Dania Beach adjacent to the Fort Lauderdale Hollywood International Airport and the Dania Cut-Off Canal and associated Marinas. As part of the development of the south runway extension at the airport, stormwater run-off was re- directed and has adversely impacted Taylor Lane. This roadway provides the only access to the marinas located on the north side of Dania Cut Off Canal west of US 1. PDS provided design, permitting and engineering services during construction for the development of a drainage system to help alleviate flooding of this roadway from stormwater run-off. The project was designed by PDS and permits were obtained from the local governmental agencies. The PDS design included the development of drainage improvements within the roadway and the development of a dry retention area to collect the stormwater run-off from the roadway. PDS was involved in the contractor selection, overseeing the preparation of the contract and ultimate completion of the improvements. The scope of work of this project includes the following task: Coordination with County and Government to expedite the project Design and Permitting of the drainage system to help alleviate roadway flooding Design of the Drainage System to meet local drainage criteria Pavement Marking and Signage Design Provide Engineering Services during construction to certify the completion of the project Premiere Design Solutions Staff’s role in the project is: General civil engineering services, including Paving and Drainage Infrastructure improve- ments, stormwater management and grading design. Obtaining Engineering Permits for the project Construction Management and Engineering during construction services. 185 G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 1 2 3 4 5 6 7 8 9 10 STANDARD FORM 330 26. NAMES OF KEY PERSONNEL (From Section E, Block 12) 27. ROLE IN THIS CONTRACT (From Section E, Block 13)123 4 5 6 7 8 9 10 29. EXAMPLE PROJECTS KEY NO.TITLE OF EXAMPLE PROJECT (FROM SECTION F)NO.TITLE OF EXAMPLE PROJECT (FROM SECTION F) 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in "Example Projects Key" section below before completingtable. Place "X" under project key number for participation in same or similar role.) Luis J. Jurado, P.E. Civil Engineering QA/QC ✘✘✘✘✘✘✘✘✘✘ Gustavo A. Eckardt. P.E. Project Manager ✘✘✘✘✘✘✘✘ ✘ Henry Rivera CADD Manager ✘✘✘✘✘✘✘✘✘ ✘ Jason McKoy Project Engineer ✘✘✘✘✘✘✘✘ Pembroke Pines City Hall and Civic Center, 2015 A/E Professional Consultant Services for Federally Funded Projects, 2015 Hard Rock Stadium Pedestrian Bridges and Tunnels, 2019 Various Roadway Intersection Surveys, 2019 CBIS/CBRA/BHS Program Civil Engineering, 2016 West Side Water Main Loop, 2018 Runway Incursion Mitigation (Taxiways A & D), 2017 Broward County Transit – Professional Services Agreement, 2016 FDOT Minor Highway Transit Enhancements, 2010 Taylor Lane Roadway Improvements, 2014 186 RFQ No: 20-07-01 CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) iii.Surveyors and Mapping Category Firm Similar Work Completed 187 OWNER CONTACT Broward County Transit Arethia Douglas, P.E. Service and Capital Planning 1 N University Dr., 3100A Plantation, FL 954.357.8375 COMPLETION DATES December 2019 KEY PERSONNEL Luis Jurado, PE / Gustavo Eckardt, PE / Fernando Fernandez, PSM DESCRIPTION Premiere Design Solutions, Inc., (PDS) was retained by Broward County Transit to provide professional surveying services for horizontal designation and soft digs for an approximate area of 78,796 SF (1.81 Ac) within the Ravenswood Transit Facility located in Broward County, Florida. The ultimate goal of the project is to install electric charging facilites for upcoming electric buses at this facility. In this project, PDS provided Level "B" underground utility location according to ASCE SUE procedures adopted by Federal Highway Administration. PDS obtained a Design Sunshine-One-Call Ticket and requested as-built drawing from all utilities responding to the ticket. Information collected was analyzed and drafted into and AutoCAD Underground Utilities file. This information was used by our field location crews to field mark existing utilities critical and open areas including roadways and areas outside existing buildings. PDS also utilized GPR and Electronic Induction devices to tone up the lines in order to be able to locate and paint them in color coded mode according APWA Uniform Color Codes. Painting markings were collectd by survey crew to accurately represent their location in a drawing deliverable. Once designation was complted, PDS scheduled and conducted utility location services at 25 (twenty-five) identified Soft dig locations, at specific locations determined by the client and verified by our markigns. This SUE task included certified Reports for the Soft digs, along with the field SUE Reports detailing horizontal location, surface elevation, surface material, measure down to top of utility, diameter of the line or width of conduit, type of material, owner if determinable and direction of line at that location. Premiere Design Solution’s role in the project is: Designate, and then survey, underground utilities based on Sunshine 811 Markings (if available) and Ground Penetrating Radar (GPR) and Electromagnetic Devices on the field. Subsurface Utiltiy Engineering (SUE) of an approximate area of 78,796 SF. Upon completion, Project Engineer verified the designation in the field. All surveys provided electronically utilizing AutoCAD delivered in a Compact Disc. Provided 25 soft digs to locate vertical alignment with report for underground utilities. (Electric, Fiber Optics, etc.) Broward County Transit Ravenswood Bus Transit Facility SUE Broward County, Florida 188 OWNER City of Fort Lauderdale CLIENT CONTACT ATKINS Humberto Alonso Southeast Florida Manager 2001 NW 107th Ave Doral, FL 305.514.3550 CONSTRUCTION COST N/A ($120,000 - Assessment Fee) COMPLETION DATE November 2016 DESCRIPTION The City of Fort Lauderdale is committed to being a fully connected city of tomorrow by 2035. This can only be achieved by providing safe, convenient, accessible, and comfortable connections. The 2013 Neighbor Survey results indicated that 52% of residents are satisfied with the availability of sidewalks in the City. Additionally, 29% of the residents responded that the maintenance of streets, sidewalks and infrastructure should receive the most emphasis from City leaders over the next two years. As part of the comprehensive effort to address resident’s concerns, the City has embarked on a citywide Sidewalk Assessment Program, utilizing a continuing services consultant contract with Atkins. Work performed under the consultant task order included a GIS inventory of all 420 miles of City-owned sidewalks and an interactive report with sidewalk deficiency, photo and GIS location, type, and length of damage. Premiere Design Solutions, Inc (PDS) served as a sub-consultant to ATKINS on this program and was responsible for providing all of the field inspection and sidewalk condition assessment of the 420 miles of city sidewalks. Work included the coordination and training of field staff in the use of project equipment, such as the Trimble Geo 7 Series and the criteria dictated by the client in the categorization, prioritization and levels required by the project. Assessment included the identification of ADA non-conformances, unsafe sidewalks, cracks and damages. PDS also provided scheduling and coordination of field crews conducting the condition assessment in order to meet the client’s delivery schedule. Data collected was uploaded to the Clients Server for report generation. PDS also conducted Quality Control on data collected, reports and images. Premiere Design Solution’s role in the project is: Equipment Coordination and Staff Training Project Scheduling and performance tracking Existing sidewalk condition assessment using GPS and Camera Equipped data collectors Assessment included ADA deficiencies and condition verification QA/QC of data collected and Coordinated re-assessment of data as required City of Fort Lauderdale Citywide Sidewalk Assessment Program Broward County, Florida 189 OWNER CONTACT City of Doral Mr. David Soler Parks Bond Program Mngmnt. Team 8401 NW 53 Terrace Doral, FL 33166 305.850.9766 COMPLETION DATES Ocotber 2019 - February 2020 CONTRACT VALUE $20,000 KEY PERSONNEL Luis Jurado, PE / Gustavo Eckardt, PE / Fernando Fernandez, PSM DESCRIPTION Premiere Design Solutions, Inc., (PDS) was retained by the City of Doral as a Sub-Consultant of the Doral Parks Bond to perform this project. The project site included Folio Nos. 35-3022-032-0090 and 35- 3022-032-0090 which include approximately 131,111 SF and 52,832 SF in total area. Survey Area included public sidewalks and public roads ROW to ROW, outside the above-mentioned sites. With this, the total area survey was about 240,000 SF (5.5 Acres), plus adjacent roadways. Scope required an ALTA Survey as requested by the client, and also included specific information about existing trees, traffic signs, sanitary and drainage manhole information and full ROW to ROW survey of roads fronting the project area except NW 84 Avenue. Premiere Design Solution’s role in the project was: ALTA Survey signed and sealed by a Professionally Licensed Surveyor registered in the State of Florida Survey contained physically verified and electronically recorded boundary, utility, road, building, and other information as necessary to provide an ALTA Survey per State Law and the Table A items (1, 2, 3, 4, 5, 8, 11, 14, and 21 as required by the Client) Work included public sidewalks and full ROW to ROW survey of public streets fronting the property such as NW 53rd Street (Executive Center Dr.) and NE 53 Terrace, excluding NW 84 Avenue. Pavement markings, signge and striping within this area, was also included All sanitary sewer and storm water manhole information including elevations for the Bottom, Top, Invert, as well as invert direction, size and material was collected. Tree Survey information included a general common name of the tree, width of the trunk at breast height, height and canopy coverage. Topographic data as elevations shots was taken based on NGVD 29 vertical datum. City of Doral – Parks Bond Program Doral Central Park Survey City of Doral, Miami-Dade County, Florida 190 OWNER Miami-Dade Transit OWNER CONTACT Javier Salmon Construction Project Manager III 701 NW 1st Court, Suite 1500 Miami, FL 33136 786.473.4710 CONSTRUCTION COST $1,000,000 COMPLETION DATE December 2013 DESCRIPTION Premiere Design Solutions, Inc. (PDS) served as the Construction Project Managers under the Contractor selected to Furnish and Install transit improvements at 72 locations in Miami-Dade County, in the Cities of Homestead, North Miami and Miami Lakes, Bay Harbor Islands, El Portal, Opa-Locka , Florida City, Surfside, North Miami Beach and City of Aventura. These p roject were Federally Funded and coordinated by the Miami-Dade Transit Department. PDS is the main contact for all communications between Contactor, County, City and Federal Agencies in this contract. Project includes the ADA accessibility improvements to bus stop locations, new bus shelters and amenities, new sidewalk and reinforced concrete pads, the relocation of existing bus shelters and permitting activities. The PDS professional staff has been tasked with the permitting through the 10 municipalities involved in this project, coordination with Miami-Dade Transit and the shelter manufacturer for the approval of shop drawings and resolution of field related issues. PDS also developed incidental engineering design plans and the construction schedule, providing monthly updates. Thanks to the vast Transit Improvements experience brought by PDS, these projects have been able to be completed within the strict time frame dictated by owner and Federal Agencies funding this project. Premiere Design Solution’s Duties in the project are: Conduct Pre-Construction visits to identify field problems early on. Obtain permits through Municipalities and Miami-Dade County. Develop and Update Construction Schedule Perform periodic field visits to check progress of construction. Prepare monthly payment requisition packages, including updated project schedule, progress photographs, and related documentation as required for Federally Funded Projects. Prepare Change Notice and Request for Information Documents and negotiate resolution Testing coordination and monitoring Safety and Quality Control during Construction. Incidental Engineering Drawings to obtain necessary permits Liaison between Municipalities, County and Contractor on any aspect related to this project. Miami-Dade Transit ARRA Municipalities Group A&C- Transit Improvements 10 Different Municipalities, Florida 191 OWNER City of Miami Gardens CLIENT CONTACT City of Miami Gardens Jimmie Allen Capital Improvement Projects Division City of Miami Gardens 18605 NW 27th Avenue Miami Gardens, FL 33056 305-622-8000, Ext-2802 DESIGN COST $5,200 COMPLETION DATE July 2018 DESCRIPTION Premiere Design Solutions, Inc. (PDS) provided Professional Land Surveying services for a portion of the Arch Diocese Site located in the City of Miami Gardens, Florida at 18330 NW 12th Avenue. The overall project site was bound by NW 12th Ave to the East, The Florida Turnpike to the West, NW 186th Street to the North and NW 183rd Street to the South. The focus area of this work proposal was about 7.4 Acres and has an irregular triangular shape and falls within the overall project site, represented in the image above in red. The overall project site was composed of 4 parcels identified by Folio Nos. 34-2102-000- 0110, 34-2102-000-0040, 34-2102-000-0042, and 34-2102-000-0041. The work area included undeveloped land with heavy vegetated areas. Premiere Design Solution’s role in the project is: Boundary Survey including boundary demarcations Legal description Relevant topographic features Delineation of existing property lines Plat information including recorded easements Arch Diocese Site – 18330 NW 12th Avenue City of Miami Gardens, Florida 192 OWNER City of Opa-Locka CLIENT CONTACT EAC Consulting, Inc. Carlos Gonzalez City of Opa-Locka Project Manager 12950 NW 42nd Avenue Opa-Locka, FL 33054 305-206-0279 CONSTRUCTION COST $15,000,000 COMPLETION DATE July 2016 DESCRIPTION Premiere Design Solutions, Inc. (PDS) serves as the Design Criteria Package Topographic Surveyor for the City of Opa-Locka and their Capital Improvement Plan, to bring water, wastewater and stormwater improvements throughout the City. Survey work included the collection of all above ground features, topographic elevation cross sections, research and placement of monument, Right of Way, Easement and Center Lines, draft plats, and generate layered assets in AutoCAD software to represent field data collected. This project includes the topographic route surveys for over 200,000 LF of roadway to receive water and sewer improvements as part of the Capital Improvements Program (CIP) throughout the City of Opa- Locka, and requires PDS to complete all surveys with a very aggressive schedule, in order to meet scheduled deadlines and limited funding. To meet the aggressive schedule, our crews utilize state of the art, and the latest model of GPS rover and Data Collectors available in the market, to deliver high quality data at high production speeds. Premiere Design Solution’s role in the project is: Plat research and drafting for ROW verification. Field Data Collection with GPS units Open all Manholes and Catch Basins to provide client with invert pipe information Cross sectional elevations from ROW to ROW of roadway to generate topographic cross sections Prepare key map and citywide survey drawings Obtain topographic data of horizontal and vertical location of all above ground features Identified easements available in county property records Coordination between City, Engineering Consultant and Survey Field Crews City of Opa-Locka CIP Citywide Topographic Surveys Opa-Locka, Florida 193 OWNER City of Opa-Locka CLIENT CONTACT City of Opa-Locka Carlos Gonzalez City of Opa-Locka Project Manager 12950 NW 42nd Avenue Opa-Locka, FL 33054 305-206-0279 CONSTRUCTION COST N/A COMPLETION DATE August 2015 DESCRIPTION Premiere Design Solutions, Inc. (PDS) served as the Consultants for the City of Opa-Locka as Topographic Surveyor, for the development, preparation and drafting of Legal Description and sketches for 11 properties located along Cairo Lane that were encroaching into public right of way. This project was a support service to the City of Opa-Locka in the development of legal easement documentation for future roadway improvements planned within the City to provide drainage and pavement improvements along Cairo Lane from NW 135 Street and the Canal. The project consisted on the drafting of legal descriptions and sketches for easements currently in negotiation between the City and property owners. Project Included one document with legal description and sketch for each of the 11 properties included in the project. The legal descriptions and sketches provided where utilized by the City and were included in their preparation of documents and negotiation of easements. The project was executed expeditiously to meet the aggressive schedule required for the Cairo Lane Roadway improvements project, which included a federal grant that had time constraints. Our crews utilized state of the art, and the latest model of GPS rover and Data Collectors available in the market, to deliver high quality data at high production speeds, and pipe finders to locate property corners. Premiere Design Solution’s role in the project is: Plat research and drafting for ROW verification. Field Data Collection with GPS units Searched property corners for Property Corner markers Prepare key map and Easement survey drawings Identified easements available in county property records Prepared Legal Descriptions Drafted sketches of Proposed Easements Prepared legal description and sketch 3 page documents for each property. Coordination between City, Engineering Consultant and Survey Field Crews City of Opa-Locka Easements for Cairo Lane (11 Properties) Opa-Locka, Florida 194 OWNER Miami-Dade Water & Sewer Department CLIENT CONTACT Carlos Lopez Sr. Project Manager 786.361.1645 WADE TRIM CONSTRUCTION COST $18,000,000 COMPLETION DATE December 2018 DESCRIPTION As part of the Ocean Outfall Legislation (OOL) program, Miami -Dade Water and Sewer Department is undertaking construction of several miles of large-diameter wastewater force mains to redirect wastewater effluent and eliminate ocean outfalls. The projects under Task Order No. 1 are sections of force main that will convey wastewater flow to and from the Southwest Booster Pump Station (SP-1). SL-3A.1 is a 60-inch transmission force main proposed to convey flows from SP-1 to SL-3A.2, which is a pipeline under separate contract that will continue conveyance of flow from SP-1 south. SL-3A.1 has an approximate length of 8,600 linear feet. The proposed transmission main starts at SP-1, extends east along SW 136 Street and then south along SW 137 Avenue before connecting to SL-3A.2 near SW 152 Street and SW 137 Avenue. SL-3B.1 is a 36-inch suction force main proposed to convey sewage from the Country Walk area to SP-1. It has an approximate length of 7,500 linear feet. The force main begins near SW 152 Street and 137 Avenue where it will connect to two existing 16-inch force mains and one 20-inch force main, extends north along SW 137 Avenue, then west along SW 136 Street before connecting to the suction side of SP-1. The start point for this force main is approximate. CONSULTANT will coordinate with the designer of SP-1 and SL-3B (Jacobs Engineering). The connection to SP-1 shall be defined and provided with the required isolation valves to allow for shutdowns during maintenance or repairs Premiere Design Solutions Staff’s Task in the project was: Field Investigation and Land Surveying. Provide Design and Technical advisory services during the design of SL-3A1/3B.1. Provide QA/QC on the engineering and survey during the project for phases 3.1 thru 3.7. Provide water and sewer design engineering assistance to prepare design documents and specifications. Assist in obtaining project related permits. Topographic ROW Surveys for Design for 60-inch & 36 inch FM along SW137 Ave Miami-Dade Water & Sewer Department 195 OWNER Miami-Dade County CLIENT CONTACT Luis Lacau Miami-Dade County, Head of Special Projects and Survey Section 111 NW 1st St, Miami, FL , 33128 luis.lacau@miamidade.gov 305.375.5774 CONTRACT VALUE $34,000 COMPLETION DATE August 2019 DESCRIPTION Premiere Design Solutions, Inc. (PDS) served as the Topographic Surveyor Consultant for Miami-Dade County, under the Miami-Dade County Surveying Pool contract, for the completion of the surveying portion of this project. The project intent was to provide roadway intersection improvements at five different roadway intersections. PDS was tasked with the topographic surveys required for the project, which required the completion of five separated Specific Purpose Surveys, one for each intersection, but each had to include all visible relevant topographic features along the proposed site area. Right-Of-Way research and preparation, plat research and the submittal drawings were required to follow standards provided by the Client, including layers, line weights, colors, symbols, etc., as established by Miami-Dade County. Project had a very aggressive timeline to meet scheduling requirements. PDS utilized multiple crews to be able to finalize within 30 days of work order notice, working at risk, prior to obtaining final approvals, to be able to complete the project in time. PDS completed the following scope at each location: 1. Established centerlines of rights of way, based on existing Plats. 2. Showed right of way lines as per Public Records for the project area. 3. Established a physical control baseline for the project using the center lines of the right of ways. 4. Established a site benchmark in NGVD 1929 elevation datum. 5. Located all topographic data for approximately 50 beyond the PC’s. 6. All drainage structures located including the size of the structures, pipes inverts, elevations and sizes. 7. Located all existing mast arm including lengths, height and sizes. 8. Elevation Cross section data every 25’. 9. Data delivered in state plane coordinates and aerial photographs 10. Signed and sealed Topographic Survey in a Scale of 1” = 20’. 11. Located all overhead wires and ground clearance at the Max. sag point. 12. Digital Cad drawing submittal prepared in 2014 Auto Cad version. 13. Prepared survey report with field data. 14. Cad Drawing used the Cad Standards as Provided. 15. Electronic Submittal in Electronic Transmittal (e-transmit) Format. Various Roadway Intersection Surveys Miami-Dade County, Florida 196 OWNER Oleta Partners LLC CLIENT CONTACT Oleta Patners, LLC Darryl Lee, P.E., LEED AP Development Project Manager 15045 Biscayne Boulevard North Miami, FL 33181 305-442-6531 CONSTRUCTION COST N/A COMPLETION DATE February 2013 DESCRIPTION Premiere Design Solutions, Inc. (PDS) served as the Surveyor and Engineering Consulting firm for this project which included the filed data collection, computer drafting, digital terrain modeling (DTM), topographic survey, volume calculations and report preparation including cross sections of crushed concrete stock piles. PDS was contracted to determine the volume of crushed concrete material stockpiled at the Biscayne Landings construction site. The developer has hired a contractor tasked with crushing and stockpiling crushed concrete for future fill operations on site. PDS coordinated in-house survey crew to obtain horizontal and vertical data of the location and elevation of the stockpiled material. With the information of the points collected in the field utilizing cross sections no longer than 25’, information was migrated into AutoCAD Civil 3D to generate a Digital Terrain Model (DTM) with the information collected from the field, generating surfaces for the existing ground and for the surface area of each of the five stock pile mounds located at the construction site. The DTM was used to determine the volume between the two surfaces, and to generate cross sections of the stock piles at constant intervals. A topographic survey was completed, incorporating the data collected in the field and data from the site survey and a plan view drawing was generated. A volume calculation report was created with plan view, cross sections and volume calculation data. Findings from our volume determination were used to determine payment quantities and to determine production rate adequacy by the owner. It was found that the Volume stock piled was considerably less than expected, so production of crushed concrete will have to increase to reach projected targets. Our services saved allowed our client to perform this task on budget and on schedule. This project was completed within the aggressive schedule required by the owner. Premiere Design Solution’s role in the project is: Conduct Field Data Collection and topographic Survey Develop a Digital Terrain Model of existing ground and crushed concrete surfaces Volume Calculations Volume Determination Report Preparation with Cross Sections for each Mound. Biscayne Landing – Swerdlow Group Crushed Concrete Volume Determination North Miami, Florida 197 Survey Principal / QA/QC Luis Jurado, P.E. –PDSProject Manager Gustavo Eckardt, P.E. –PDS Surveying Crew 1 Leader Jorge M. Olmo –PDS Chief Surveyor Fernando Fernandez PSM –PDS Henry Rivera –PDS Surveying Crew 2 Leader City of Sunny Isles Beach 198 FERNANDO FERNANDEZ, PSM Surveying Lead EDUCATION • Hydrologist Engineer Alma- Ata, former USSR, 1987 FIELD OF SPECIALIZATION • Field Data Collection • Autocad / Land Desktop • Total Station and Data Collector Knowledge • Topographic Surveys • Roadway Surveys • Certificate of Elevations • GPS Field Location • Surveys with NAVD88 and NGVD29 • As-Built Certified Surveys for Water and Sewer projects • Project Stakeout • Writing and interpretations of legal descriptions • Plat Research • Legal Description Drafting CERTIFICATIONS • Professional Land Surveyor and Mapper • State of Florida, LS 6765 YEARS OF EXPEREINCE 20 Years EXPERIENCE SUMMARY Mr. Fernandez has nearly twenty years of field data verification, collection and surveying experience. Mr. Fernandez is a professional proficient in the use of different kinds of Data Collectors, Total Station and other surveying equipment, and is familiar with the process to develop Topographic Surveys and As-Built Drawings Miami-Dade County and Broward County, conducting surveys of above ground features and utility verifications, roadway surveys, construction stake-out and utility project as-builts. Mr. Fernandez is a diligent worker with knowledge of Autocad and various tools of the trade, with the ability to manage multiple tasks, work on projects autonomously, and work as required to meet deadlines. Mr. Fernandez is a Florida Registered Land Surveyor with extensive experience in working in the City of Opa-Locka, having personally walked most of the City Streets, and is constantly participating personally on field data collection of all assignments under his control, qualifying him as a Surveyor with extensive field knowledge and experience. KEY EXPERIENCE Opa-Locka Citywide CIP Water & Sewer Improvement Surveys, City of Opa- Locka, FL This project includes the topographic route surveys for over 200,000 LF of roadway to receive water and sewer improvements as part of the Capital Improvements Program (CIP) throughout the City of Opa-Locka. PDS is part of the Team to provide design criteria packages for the letting of this work. Mr. Fernandez is the Lead Surveyor and is responsible for the production of survey drawings, collecting all ROW data, above ground features and elevations. Cairo Ln Topographic Survey, City of Opa-Locka, FL - This project was an emergency project to conduct a topographic survey of 2,600LF of roadway in the City of Opa-Locka. Project included the collection of all above ground features, spot elevations, recording of existing conditions, and depiction of right-or-ways along this corridor. Mr. Fernandez was responsible for field data collection and conducted reviews of CAD drawings prior to submittal. Sketches and Legal Descriptions for 11 properties, City of Opa-Locka, FL - This project was a support service to the City of Opa-Locka in the development of legal easement documentation for future roadway improvements planned within the City. The project consists of the drafting of legal descriptions and sketches for easements currently in negotiation between the City and property owners. Project Included one document with legal description and sketch for each of the 11 properties included in the project. The legal descriptions and sketches provided will be utilized by the City and will be included in their preparation of documents and negotiation of easements. Mr. Fernandez was the lead surveyor on this project generating plats and performing field data verification and site visits to generate legal sketches and descriptions. Various Roadway Intersections Surveys, Miami-Dade County, FL This project was to provide roadway intersection improvements at five different roadway intersections throughout Miami-Dade County. Mr. Fernandez was tasked with the topographic surveys which required the completion of five separated Specific Purpose Surveys with a very aggressive schedule. Each location included all visible relevant topographic features along the proposed site area, Right-Of-Way research and preparation, plat research and the submittal drawing was required to follow standards provided by the Client, including layers, line weights, colors, symbols, etc, as required by Miami-Dade County. Mr. Fernandez led the field crew in the data collection and was responsible for the generation of survey drawing deliverables. 199 FERNANDO FERNANDEZ, PSM Surveying Lead City Land Surveyor, City of Miami Gardens, Florida. The City of Miami Gardens engaged a Premiere Design Solutions as the City’s Consultant for Land Surveying Services. Mr. Fernandez has led this project for the past 5 years, and was recently selected again as the firm of choice of the City for Land Surveying Services. Under this project, Mr. Fernandez has completed ALTA surveys, Elevation Certificates, City Owned Property specific purpose surveys, Boundary surveys and Legal description and sketches. This is fast paced work, with quick turnaround required by the Client, and Mr. Fernandez always delivers on time. Mr. Fernandez leads his team of CAD drafters in the preparation of deliverables, and provides signed and sealed final documents. Medley Fire rescue Facility Survey, Medley, Miami-Dade County, FL - This project was to replace the perimeter fence after the existing fence was damaged by recent storm events. The project site was an existing and Active Fire rescue Facility, of about 6.4 Acres, owned and maintained by Miami-Dade County. A specific purpose survey was conducted by Mr. Fernandez which included all visible relevant topographic features along the proposed site boundary, physical boundary demarcations, legal description, marking property corners, existing property lines and recorded easements and plat information as available in readily available public information records. Mr. Fernandez led the field crew collecting data and developed topographic drawing deliverables. Topographic ROW Surveys for Design for 60-inch & 36 inch FM along SW137 Ave. As part of the Ocean Outfall Legislation program, M-DWASD is undertaking construction of several miles of large-diameter wastewater force mains to redirect wastewater effluent and eliminate ocean outfalls. This project included Field Investigation, Land Surveying under Mr. Fernandez lead, who was responsible for the field investigation and land surveying. Miami-Dade County Bus Stop Topographic Surveys, Miami-Dade County, FL - This project includes performing topographic surveys in the municipalities of Pinecrest, Town of Surfside, Bay Harbor Islands, and Miami Lakes. Surveys include the location of all above ground features, locate and translate benchmarks, generate elevations, easement and right-of-way determination for the addition of bus shelters at over 30 local roadway bus stops. Mr. Fernandez directs our crew to obtain field information and then reviews CAD drawings to be later provided to our engineering department for design purposes. South Bulkhead Repairs Bays 165-177, Port Miami, FL. This project includes the topographic route surveys for over 200,000 LF of ROW surveys on roadways to receive water and sewer improvements as part of the Capital Improvements Program (CIP) throughout the City of Opa-Locka. PDS is part of the Team to provide design criteria packages for the letting of this work. Mr. Fernandez is the Lead Surveyor and is responsible for the production of survey drawings, generation of plat drawings and location of property lines, easement and monument lines, collecting all ROW data, above ground features and elevations. Various Projects Within Miami-Dade County, FL - Mr. Fernandez worked as a Crew Chief performing almost all kind of surveying works in different projects as Riverside Subdivision and Beacon Lakes: boundary survey, topographic and hydrographic surveys, GPS locations, water and sewer stakeout, buildings stakeouts, final surveys. Worked in charge of other smaller projects performing Boundary, ALTA, Cadastral, Topographic, Subdivision, Hydrographic, Control, Construction Stakeout, and As-builts. Biscayne Landing Engineering and Surveying Support, North Miami, FL - Mr. Fernandez is the Survey Crew Party Chief in this project to provide development support to the Owner. Project included the determination of volume of crushed concrete material stockpiled at the Biscayne Landings construction site and volume of lakes to be filled. Mr. Fernandez coordinated survey crews to obtain horizontal and vertical data of the location and elevation of the stockpiled material and lake soundings. With the information of the points collected in the field utilizing cross sections no longer than 25’, information was migrated into AutoCAD Civil 3D to generate a Digital Terrain Model (DTM), generating surfaces for the existing ground and for the surface area of each of the five stock pile mounds located at the construction site. The DTM was used to determine the volume between the two surfaces, and to generate cross sections of the stock piles at constant intervals. NE 10th Street & NE 7th Avenue Roadway Improvements, Dania Beach, FL. Project consisted of extension of NE 10th Street to the east and reconstruction of NE 7th Avenue from this intersection to the north intersection with Taylor Road. Project proposed water and sewer improvements along this roadway corridor. Mr. Fernandez was responsible for the topographic survey of this roadway corridor, including construction stake-out and collection of as-built data and preparation of final as-built drawings for the project including as-built elevations and alignments. 200 FERNANDO FERNANDEZ, PSM Surveying Lead Taylor Lane Roadway Improvements, Dania Beach, FL. - The project consisted of topographic survey, drainage improvements and roadway improvements for the purposes of providing flood protection for Taylor Lane located in the City of Dania Beach. Mr. Fernandez was the Project Surveyor and was responsible for conducting field data collection of above ground features including elevations and CAD drawing production for the later design, permitting and construction oversight for the improvements to this roadway. The design included creating roadside swales and retention areas, along with storm inlets and drainage piping system to convey the roadway stormwater run-off. The project also included raising sections of the roadway to meet Broward County roadway flood criteria. FDOT District 4, Broward County Transit Bus Shelter Project, Broward County, FL. This Design-Build, fast track, project consisted of providing ADA compliant bus shelters to 73 locations throughout the cities of Wilton Manors, Oakland Park and Pompano Beach, in Broward County. Mr. Fernandez was the project Land Surveyor responsible for the generation of topographic surveys along local roadways, recording all above ground features at all the sites, utilizing GPS equipment and coordinating work between survey crew, client and engineer. Fort Lauderdale Airport Runway Expansion Project, Fort Lauderdale, FL – this project proposes to expand the runway over US-1. Mr. Fernandez participated in the generation of topographic surveys in relation to the underground utility designs of engineering drawings for 16” Water Main, and 12” Force Main for utility relocations required for this project. Project also included a shared communication duct bank to relocate communication utilities along the corridor. Mr. Fernandez also provided periodic field visits to record as-built information of the communications duct-bank and provided survey controls during construction. Utility companies included AT&T, FPL, TECO, Comcast, FAA, Windstream, XO, CITGO, Buckeye Pipeline, Qwest, Verizon, Sprint, L3, etc. Pembroke Pines City Center, Pembroke Pines, Florida (SR-820 & Palm Ave.) - The Pembroke Pines City Center is a lifestyle center on a 115-acre site that provides new urbanism design mixing residential, commercial and retail all within walking distance in the City of Pembroke Pines. Mr. Fernandez was the overall Survey Party Chief and Surveyor Principal responsible for the topographic and boundary survey of a portion of the site ready for construction. Mr. Fernandez also conducted periodic visits to the site to stake out the different components of the project, to direct contractor as to the location of proposed improvements. Tasks included the stakeout of proposed roadways, light pole locations, building corners, underground utility as-built location and elevation, and horizontal and vertical plumb verification of concrete slabs for buildings. Hard Rock Stadium Pedestrian Bridges and Tunnels City of Miami Gardens, Florida. The City of Miami Gardens engaged a Design/Build firm to design, permit and construct pedestrian improvements at the Hard Rock Stadium in the City of Miami Gardens, which completed prior to a big event scheduled for February 2, 2020. Proposed pedestrian prefabricated metal bridge, fully enclosed with galvanized mesh, with minimum clearance of 17.5’, a span of approximately 145’, height of 15’ and 15’ of inside clear width, with concrete ramps and steps to provide ingress and egress to proposed pedestrian overpass. Proposed ramps and steps were constructed in private land, which access to the public will be uninterrupted, open 24 hours a day and an easement granted to the City of Miami Gardens to place proposed ramps in public land. Mr. Fernandez was responsible for the boundary and topographic survey for this project and plat review and drafting of legal sketch and descriptions for easements. ADA Compliant Bus Stop Improvement, Town of Miami Lakes, Miami Lakes, Florida. Mr. Fernandez was the project surveyor for this project which included the filed data collection, topographic survey, scope determination and the generation of demolition, new construction, and maintenance of traffic plans. Project provided the client with the design for ADA improvements to 11 bus stops locations, new bus shelters, concrete pads, sidewalks and amenities. Mr. Fernandez was responsible for the generation of survey files at the 11 sites to be used as base for the engineering design on this project. City of Opa-Locka Bus Stop Topographic Surveys, Miami-Dade County, FL - This project included performing topographic surveys in the City of Opa-Locka to provide new bus shelters at existing bus stop locations. For this project, Mr. Fernandez conducted Field Surveys that included the location of all above ground features, locate and translate benchmarks, generate elevations, easement and right-of-way determination for the addition of bus shelters at over 12 local roadway bus stops. Mr. Fernandez directs our crew to obtain field information and then reviews CAD drawings to be later provided to our engineering department for design purposes. 201 LUIS J. JURADO, P.E.. Principal EDUCATION B.S. in Civil Engineering, University of North Carolina Charlotte, 2003 PROFESSIONAL REGISTRATIONS • P.E. Florida License No. 66396 • P.E. South Carolina License No. 28394 PROFESSIONAL AFFILIATIONS • Member, American Society of Civil Engineers • FES (Florida Engineering Society – Member) FIELD OF SPECIALIZATION Transportation Planning Transit Facilities ADA Compliance Storm Water Management General Civil Permitting Bid Preparation & Assistance Construction Management Utility Coordination YEARS OF EXPEREINCE 17 Years EXPERIENCE SUMMARY Mr. Jurado is a professional engineer registered in the states of Florida and South Carolina with over 17 years of experience in surveying, civil, transportation and municipal engineering design. Mr. Jurado currently serves as the President of Premiere Design Solutions, Inc. and he is the professional in charge of all project coordination between PDS and its Clients. PDS currently serves as the Prime Consultant for Miami Dade Transit (MDT) and Broward County Transit (BCT), the two largest transit authorities in the state of Florida. Mr. Jurado has been the project coordinator for the professional engineering services work assigned to PDS with duties and responsibilities that include meeting on a regular basis with MDT and BCT officials to provide recommendations on scope of work and schedule for projects, meetings with governmental agencies having jurisdiction over project site locations to discuss and negotiate permitting requirements, complying with Federal Transit Authority (FTA) specifications, Tiger Grants, and quality control review. Mr. Jurado has led his team in transit improvements at more than 800 locations in over 30 municipalities within Broward and Miami-Dade Counties. RELEVANT EXPERIENCE Miami-Dade County Surveying Pool Contract, Miami -Dade, Florida. Mr. Jurado has acted for the past several years as the project principal, ensuring adequate staffing and needs are met as required by this ongoing county contract. Up to date, under Mr. Jurado’s direction, three assignments have been successfully completed on this project. Continuous Professional Services for Federally Funded Projects, Miami Dade Transit, Miami-Dade County, Florida. The Continuous Professional Services for Federally Funded projects was a multi-year project to develop transit facilities that are funded through the FTA. The scope of work for this contract includes but is not limited to technical and operation planning, transit studies, environmental impact statements, permitting, engineering inspections, surveying, fire/life/safety consulting, cost estimating, structural, geotechnical, industrial, electrical, systems and mechanical engineering, architecture, transit and transportation planning in accordance with FTA requirements, design criteria, plan and specification reviews for federal compliance, design of new transit facilities, construction engineering and inspections, value engineering, project cost estimates and traffic studies. Mr. Jurado led Six work orders under this contract performing quality control review and analysis of FTA guidelines, project coordination and assisting MDT prioritizing transit improvements. Architectural and Engineering (A/E) Services for the Transit Division, Broward County Transit, Broward County, Florida. The A/E Services for the Transit Division project consists of providing comprehensive professional A/E services on a continuing term basis for the remodeling, renovation and new construction of transit facilities in which construction costs do not exceed $2 million. The comprehensive services include but are not limited to existing facility and site documentation, existing facility assessments and evaluations, project cost estimating, project schedule development and analysis, facility programming, complete architectural/engineering design of buildings, on-site and off-site improvements, permitting assistance and procurement, bid/award support and concurrence, negotiation support, construction contract administration services, inspections, surveying, materials and contract compliance testing services, computer-aided and manually generated graphics support, preparation of narratives and other textual project support, photographic and video-graphic project support, building information modeling (BIM) project support, geographic information systems (GIS) project support and information system project support. Mr. Jurado has overseen over sixteen work orders under this contract performing scope and budget determination, coordination of project team, progress meetings with Client and negotiation of permitting requirements with regulatory agencies. 202 LUIS J. JURADO, P.E.. Principal Page 2 MDT Park-and-Ride at SW 147 Ave and SR 836 Express Bus Service Planning Support, Miami-Dade Transit, FL – Mr. Jurado was the project principal and quality control manager for this project to analyze the impacts of the relocation of an existing terminal located at FIU Main campus to Parking Garage VI, and creating concepts for the Panther Station. Mr. Jurado provided key support and assistance during the update to the Categorical Exclusion Document prepared for FTA to obtain federal support on this project. Mr. Jurado also assisted in the preparation of conceptual design for the panther station, attended and participated in the public meeting for the SR 836 Express Bus Service project, and analyzed route intersections for queue jumps and TSP application and provided reviews of cost estimating tasks. North Perry Airport Park and Ride Facility, Pembroke Pines, FL. Mr. Jurado served as the Project Principal for the development of a Park and Ride Facility at the North Perry Airport located on the northeast corner of Pembroke Road and University Drive in the City of Pembroke Pines. The site development included the design of the parking facility including a drainage and lighting system to serve riders of the Broward County Transit System. Mr. Jurado was responsible for client management, and coordination of permitting procedures and approvals of the local governmental agencies such as Broward County Transit (BCT), Broward County Aviation Department (BCAD) and the City of Pembroke Pines. ARRA Municipalities Groups “A” & “C”, Miami Dade Transit, Miami-Dade County, Florida. The ARRA Municipalities Groups “A” & “C” Transit Improvements projects consisted of transit improvements at 72 locations in Miami-Dade County, in the Cities of Homestead, North Miami, Miami Lakes, Bay Harbor, El Portal, Opa Locka, Florida City, Surfside, North Miami Beach and Aventura. The projects were Federally Funded and coordinated by the Miami-Dade Transit Department, following all American Recovery and Reinvestment Act (ARRA) guidelines and regulations. PDS was the main contact for all communications with County, City and Federal Agencies in this contract. Projects included ADA accessibility improvements to bus stop locations, new bus shelters and amenities, new sidewalk and reinforced concrete pads, relocation of existing bus shelters and permitting with regulatory agencies. Mr. Jurado was involved with negotiating permitting requirements for this project. Transit Infrastructure & Shelter Improvement at Bus Stops, Broward County Transit, Broward County, Florida. The Transit Infrastructure & Shelter Improvement at Bus Stops is a multi-year project consisting of improving transit facilities throughout Broward County. This project was subdivided into ADA Improvements at Bus Stops, Bus Shelter Expansion Program, Bus Bay Enhancements and Transit Terminal Improvements. For work improvements performed at bus stops, the scope of work included providing an ADA accessible route for areas surrounding and leading to the location of the bus stops not limited to the addition of appropriately sloped concrete sidewalks, inclusion of FDOT approved curb ramps, relocation of obstructing amenities (e.g. trash cans, benches, etc.), landing pads, inclusion of curbing for protection of landing pads and addition of amenities for the public. At bus stops where shelters were provided, the scope included the selection of the most efficient placement of the structure, maintaining a practical and safe approach while supplementing the ADA guidelines. For these work orders our scope included performing Field Data Collection and Scope Determination, Topographic and ROW Surveys including existing utility coordination, Engineering Design Documents composed of paving, grading and drainage plans, maintenance of traffic plans, regulatory agency permitting and construction support. Mr. Jurado was responsible for coordinating the scope of work assigned to PDS, meeting with Client and Owner on a regular basis, review of engineering plans and assisted in negotiating permitting requirements with regulatory agencies. Broward County Transit Infrastructure Improvements, FDOT District 4, Broward County, Florida. The FDOT Infrastructure Improvement project was a Design-Build project, which consisted of providing ADA compliant bus shelters to 73 locations throughout the cities of Wilton Manors, Oakland Park and Pompano Beach, all located in Broward County, Florida. The project scope included civil, structural and electrical engineering design for the bus shelters to be installed at the current locations, as well as improvements at bus stops such as landing pads, curb & gutter, sidewalk restoration, sidewalk transitions, and amenities such as benches, trashcans and solar panels. This project required the coordination between the design team consisting of civil engineers, structural engineers, electrical engineers and a surveying team. To ensure the best possible product, this project closely followed a strict quality control procedure review prior to submittal and meeting with governmental agencies having jurisdiction over the project site location. Mr. Jurado was responsible for presenting a work program to ensure completion within the expected Client’s schedule, project team coordination and rigorous quality control. 203 GUSTAVO ECKARDT, P.E. Surveying Project Manager EDUCATION B.S. in Civil Engineering, University of North Carolina, 2002 Scheduling Seminar - Primavera Project Management, Miami Micro Data, 2005 Designing Pedestrian Facilities for Accessibility / ADA Seminar 2008. Work Zone Traffic Control & Maintenance of Traffic, FES Seminar, 2010 (BT-05-0079) PROFESSIONAL REGISTRATIONS • P.E. Florida License No. 67553 PROFESSIONAL AFFILIATIONS • Chi Epsilon Civil Engineering Honor Society - Member • FES (Florida Engineering Society - Member) FIELD OF SPECIALIZATION Topographic Surveys Water & Sewer Utilities Transportation Transit Facilities ADA Compliance Storm Water Management General Civil Engineering Permitting Bid Preparation & Assistance Construction Management Utility Coordination Utility Surveys YEARS OF EXPEREINCE 18 Years EXPERIENCE SUMMARY Mr. Eckardt is a professional engineer registered in the states of Florida with over 18 years of experience in Civil Engineering, land development, topographic surveys and roadway design. Mr. Eckardt currently serves as Director of Engineering for Premiere Design Solutions, Inc. (PDS) responsible for overseeing surveying and engineering project production, quality control and making sure our Clients needs are incorporated into our engineering design. Mr. Eckardt has been a project manager for professional engineering and surveying services work assigned to PDS. Mr. Eckardt’s experience in the public sector includes design for new and existing infrastructure utilities in different municipalities throughout South East Florida. For these types of projects Mr. Eckardt has designed roadway improvements projects for Miami-Dade Public Works, Miami-Dade Transit, Broward County Transit, Mr. Eckardt has also designed potable water and sanitary sewer collection systems for the Miami-Dade Water and Sewer Department. He has a vast experience in utility coordination, subsurface utility investigation and GIS projects. RELEVANT EXPERIENCE Citywide CIP Water & Sewer Improvement Surveys, City of Opa-Locka, FL This project includes the topographic route surveys for over 200,000 LF of ROW surveys on roadways to receive water and sewer improvements as part of the Capital Improvements Program (CIP) throughout the City of Opa-Locka. PDS is part of the Team to provide design criteria packages for the letting of this work. Mr. Eckardt is the Project Manager responsible for the plans production, scheduling and project activity coordination with the Client and field crews for this aggressive execution schedule project. Cairo Ln Topographic Survey, City of Opa-Locka, FL - This project was an emergency project to conduct a topographic survey of 2,600LF of roadway in the City of Opa-Locka. Project included the collection of all above ground features, spot elevations, underground utility investigation, recording of existing roadway conditions, and depiction of right-or-ways along this corridor. Mr. Eckardt was the project manager responsible for client coordination and scheduling of field work and drawing generation and conducted quality assurance and quality control on the project deliverables and data collection. Sketches and Legal Descriptions for 11 properties, City of Opa-Locka, FL - This project was a support service to the City of Opa-Locka in the development of legal easement documentation for future roadway improvements planned within the City. The project consists of the drafting of legal descriptions and sketches for easements currently in negotiation between the City and property owners. Project Included one document with legal description and sketch for each of the 11 properties included in the project. The legal descriptions and sketches provided will be utilized by the City and will be included in their preparation of documents and negotiation of easements. As project manager, Mr. Eckardt was responsible for client coordination and scheduling plat investigations, field work and drawing generation and conducted quality assurance and quality control on the project final deliverables. Pump Station 11C Upgrades, Opa-Locka, Florida Mr. Eckardt was the project manager and engineer of record for this project to provide upgrades to the master lift station in the City of Opa-Locka responsible for collection all sanitary sewer flows in the city and routing them to the receiving County pump station via a 12” force main. Project included the structural building renovations, completely new electrical system, pump controls, telemetry, replacement of the three main 140 HP VFD pumps rated at 3,200 GPM and the design of a standby emergency diesel operated pump with integrated generator. Permitting services through the City and RER, FPL Coordination and construction support were also provided. 204 GUSTAVO ECKARDT, P.E. Surveying Project Manager Page 2 Various Roadway Intersections Surveys, Miami-Dade County, FL - This project was to provide roadway intersection improvements at five different roadway intersections throughout Miami-Dade County. Mr. Eckardt was tasked with managing the topographic surveys which required the completion of five separated Specific Purpose Surveys with a very aggressive schedule. Each location included all visible relevant topographic features along the proposed site area, Right-Of-Way research and preparation, plat research and the submittal drawing was required to follow standards provided by the Client. Mr. Eckardt provided project coordination between client and survey crew, and ensured all production was geared towards this project, with adequate staff levels, and deliver in a timely manner to meet the aggressive schedule required in this project. Mr. Eckardt also conducted QA/QC reviews on deliverables on this project. Medley Fire rescue Facility Survey, Medley, Miami-Dade County, FL - This project was to replace the perimeter fence after the existing fence was damaged by recent storm events. The project site was an existing and Active Fire rescue Facility, of about 6.4 Acres, owned and maintained by Miami-Dade County. A specific purpose survey was conducted by Mr. Eckardt was the project manager on this project and coordinated between survey crew, user department and client. Mr. Eckardt also conducted QA/QC reviews on deliverables on this project. South Bulkhead Repairs Bay 165 - 177, PortMiami, Miami, FL - The Work of this Project comprised the general construction necessary to repair a portion of the bulkhead walls in the area of South bulkhead from Bays 165-177, including the installation of king piles, concrete cap, marine fenders, water stations and mooring bollards. Mr. Eckardt was responsible for the Topographic Survey, Civil Engineering, Utility Coordination, and Construction support required for this Project. Activities performed included Survey, Drainage Design, Drainage Calculations, utility investigation, water main and water station design, permitting Support, Bid Support and Engineering During Construction Services. Miami-Dade Water and Sewer Utility Atlas Update and GIS Implementation Miami Springs, FL - Mr. Eckardt was the Project Manager for this Miami-Dade Water and Sewer Department (WASD) project to provide support services for implementation of the Department’s GIS system for water and sewer infrastructure, with the priority of Miami Springs acquired utilities. The main objective of this project was to compile all As-Built Information related to all water and sewer assets of Miami Springs, an area of 1,900 Acres, and upload the information digitally into the WASD GIS System. Mr. Eckardt directed a six full time GIS Specialists team working at WASD entering water and sewer utility information and provides monthly updates to WASD management staff. Project included field data collection and as-built research to collect information necessary for the input of water & sewer infrastructure. North Perry Airport Park and Ride Facility, Pembroke Pines, FL - Mr. Eckardt served as Senior Project Engineer for the development of a Park and Ride Facility at the North Perry Airport located on the northeast corner of Pembroke Road and University Drive in the City of Pembroke Pines. The site development included the surveying and design of the parking facility including a drainage and lighting system to serve riders of the Broward County Transit System, and new parking lot. Mr. Eckardt was responsible for the coordination and reviews of surveying services, design, permitting with the local governmental agencies and overseeing construction of this facility for Broward County Transit and the City of Pembroke Pines. ADA Compliant Bus Stop Improvement, Town of Miami Lakes, Miami Lakes, FL - Mr. Eckardt was the project manager and engineer of record for this project, which included the filed data collection, topographic survey, scope determination, and the generation of demolition, new construction, and maintenance of traffic plans. Project provided the client with the design for ADA improvements to 19 bus stops locations, new bus shelters, concrete pads, sidewalks and amenities and coordination with Town, Miami-Dade Transit, utility investigations & permitting. Biscayne Landing Engineering and Surveying Support, North Miami, FL - Mr. Eckardt was the Project Manager in this project to provide the determination of volume of crushed concrete material stockpiled at the Biscayne Landings construction site and volume of lakes to be filled over an abandoned Landfill. Mr. Eckardt coordinated activities between the owner, Developer and field survey crews to obtain field data of the location and elevation of the stockpiled material and lake soundings. With the information of the field data, utilizing cross 25’ sections, information was migrated into AutoCAD Civil 3D to generate a Digital Terrain Model (DTM), generating surfaces for the existing ground and for the surface area of each of the five stock pile mounds located at the construction site. DTM was used to determine volume between the two surfaces, to generate cross sections of the stock piles at constant intervals. Mr. Eckardt performed calculation reviews and signed and sealed volume reports. 205 HENRY RIVERA Survey Crew / CAD Manager EDUCATION Master of Science in Industrial Engineering, University of Pittsburgh, 1978 Master of Science in Mathematical Statistics University of Chile, Santiago de Chile, Chile 1971 B.S. in Industrial Engineering, Santander Industrial University, Bucaramanga, Colombia 1968 FIELD OF SPECIALIZATION Field Data Collection Existing Condition Assessment Bus Transit Improvements AutoCAD Civil 3D Roadway Systems Potable Water Distribution Systems Reuse Water Distribution Systems Waste Water Collection and Transmission Systems Project Scheduling Storm Water Management Systems. Maintenance of Traffic General Civil Engineering YEARS OF EXPERIENCE 40 Years EXPERIENCE SUMMARY Mr. Rivera is an industrial engineer with over 40 years of experience specializing in industrial safety programs that enforce safety codes in order to reduce the risks of accidents. As a lead safety engineer Mr. Rivera had to familiarize himself with civil engineering practices and enforce safety standards to contractors that performed work at several coalmines were he led the safety programs. Mr. Rivera joined PDS as an engineer in 2008 and has been the office CAD Manager since then, operating AutoCAD Civil 3D 2016. He is responsible for maintaining our CAD standards and ensuring that every project that is ready to be delivered meets those standards. Mr. Rivera also provides engineering design support to our team and survey drafting standards and controls. KEY EXPERIENCE Medley Fire rescue Facility Survey, Medley, Miami-Dade County, FL This project was to replace the perimeter fence after the existing fence was damaged by recent storm events. The project site was an existing and Active Fire rescue Facility, of about 6.4 Acres, owned and maintained by Miami-Dade County. Mr. Rivera assisted in the field data collection of this project, and responsible for CAD production of the survey drawings. Survey included all visible relevant topographic features along the proposed site boundary, physical boundary demarcations, legal description, marking property corners, existing property lines and assisted in the research of easements and collection plat information as available in Miami-Dade County Records ADA and Transit Improvements, Broward County, FL. The ADA Improvements project is a multi-year project consisting of designing Transit Improvements throughout Broward County that are to be compliant with ADA guidelines and regulations. One of the main objectives of the program is to provide ADA accessibility to thousands of bus stops within the County. The project includes surveying, engineering design for improvements such as landing pads, shelter pads, curb & gutter, sidewalk restoration, sidewalk transitions, etc. Mr. Rivera’s duties and responsibilities include the preparation of engineering design drawings utilizing AutoCAD Civil 3D. B Bus Bay Improvements (Broward Blvd. & NW 116th Ave.), FL Mr. Rivera was the CAD technician responsible for assisting in the engineering drawings preparation for the removal of existing bus bay, roadside design of approximately 600 ft of roadway to accommodate a 10 ft unpaved shoulder, wet detention areas and pedestrian sidewalks. Responsibilities also included the preparation of utility plans to depict existing utilities within the area. Citywide CIP Water & Sewer Improvement Surveys, City of Opa-Locka, FL This project includes the topographic route surveys for over 200,000 LF of roadway to receive water and sewer improvements as part of the Capital Improvements Program (CIP) throughout the City of Opa-Locka. Mr. Rivera assisted in field data collection as survey crew member, and later on the drafting of collected data and the production of survey drawings, representing all ROW data, property information, above ground features, manholes and elevations. New Parking Facility, Dania Beach Scrap Metals, Dania Beach, FL Mr. Rivera was the CAD Designer for the new parking facility and assisted in the production of paving, grading and drainage plans for approvals with the City and governmental agencies having jurisdiction over the project site location. We coordinated with the City’s planning and zoning division the approval of the site plan. 206 HENRY RIVERA Survey Crew / CAD Manager Page 2 South Bulkhead Repairs Bay 165 - 177, PortMiami, Miami, FL - This Project at PortMiami comprised of the general construction necessary to repair a portion of the bulkhead walls in the area of South bulkhead from Bays 165-177, including the installation of king piles, concrete cap, marine fenders, water stations and mooring bollards. Mr. Rivera was a survey crew member assisting in all field related surveying activities and in the generation of Topographic Survey drawing and later also in the Civil Engineering plans. North Perry Airport Park and Ride Facility, Pembroke Pines, FL - Mr. Rivera served as Survey Crew Member and CAD Manager for the development of a Park and Ride Facility at the North Perry Airport located on the northeast corner of Pembroke Road and University Drive in the City of Pembroke Pines. The site development included the surveying and design of the parking facility including a drainage and lighting system to serve riders of the Broward County Transit System, and new parking lot. Mr. Rivera assisted in the collection of field data and surveying services, and prepared surveying drawing and also design drawings for Broward County Transit and the City of Pembroke Pines. NE 10th Street & NE 7th Avenue Improvements in Dania Beach, FL. This project consists of extension of NE 10th Street to the east to intersect with NE 7th Avenue and reconstruction of NE 7th Avenue from this intersection to the north to the intersection of Taylor Road. Project proposes water and sewer improvements along these roadway corridors. Tasks included topographic survey, design of civil plans, Utility coordination and worked with Broward County Environmental Regulation Division, Broward County Health Department and City of Dania Beach for Project permitting. Mr. Rivera was responsible for the generation base CAD Drawings and As-Built drawings for water and sewer utilities on this project. Water and Sewer Service, Trafalgar Development, Miami, FL PDS designed the new water and sewer services for the 116th Plaza, which was in septic tank and water well. PDS also processed permit applications with Miami Dade Water and Sewer Department, Miami Dade DERM, City of Miami and the Health Department. Construction Inspection Engineering Services were also part of the scope of work. Mr. Rivera was responsible for CAD drafting of all existing ad proposed features in this project. New Hope Church, Town of Southwest Ranches, Florida. Mr. Rivera was the Cad Manager and CAD Quality Control Manager involved in the design, permitting and construction certification for a church and children’s day care located along Dykes Road, north of Sheridan Street. The project consisted of lake and mitigation design for stormwater run-off collection, as well as paving and drainage design and potable water and sanitary sewer design. Project also included the drafting of topographic survey and generation of as-built survey drawings. FDOT District 4, Broward County Transit Bus Shelter Project, Broward County, Florida. This Design-Build project consists of providing ADA compliant bus shelters to 73 locations throughout the cities of Wilton Manors, Oakland Park and Pompano Beach, in Broward County. Mr. Rivera was the CAD Manager on this project responsible for setting up all drawings on this project, including topographic surveys and engineering drawings. This project required the coordination between the design team consisting of civil engineers, structural engineers, electrical engineers, shelter manufacturer and our surveying team. Mr. Rivera also assisted the field crew on this project by helping in the field data collection operation to be able to meet the strict schedule requirements set by the Design-Build Team. ADA Compliant Bus Stop Improvement, Village of Pinecrest, Florida - Mr. Rivera was the CAD manager and field data collector for this project which included the scope determination, alternatives selection, filed data collection, topographic survey and the generation of demolition, new construction, and maintenance of traffic plans. Project provided the client with the design for ADA improvements to 2 high profile bus stops locations, new bus shelters, concrete pads, sidewalks and amenities. Project included the coordination with the Village of Pinecrest, Miami-Dade Transit, and conduct underground utility verification, investigations and permitting. Regions Bank, Weingarten Realty, Pembroke Pines, FL - As CAD Technician for this project, Mr. Rivera drafted the water, sewer, drainage, cable and power infrastructure for the proposed 2-Acre site. PDS also processed permits with the City of Pembroke Pines, South Broward Drainage District, South Florida Water Management District, Broward County EPD Sewer, Health Department, FPL and ATT. Mr. Rivera also assisted in the Construction Inspection Engineering Services part of the scope of work. 207 JORGE MICHEL OLMO SURVEY FIELD TECHNICIAN EDUCATION B.A. in Architecture, Central University of Villa Clara, Cuba 1996 Specialized Computer Aided Design & Drafting, Autodesk Technical Institute, Malaga, Spain 2010 Online Web Courses – Implementing New CAD Techniques (Tips and Shortcuts / Last Versions) FIELD OF SPECIALIZATION Topographic Surveys Field Data Collection Volume Determination ADA Compliance CAD Design Water & Sewer Drafting Permitting Construction Management Field Inspections Utility Coordination YEARS OF EXPEREINCE 20 Years EXPERIENCE SUMMARY Mr. Olmo is a seasonoed professional, Architect by study but experienced in engineering design and construction management with heavy experience in surveying related activities. He has over 20 year of experience in computer aided drafting and design of engineering and architectural projects and proficient in AutoCAD Civil 3D utilizing its tools, attributes, layering system and CAD set up environments. Mr. Olmo is experienced in Water and Sewer projects, as well as Structural and Architectural specialties. Mr. Olmo is also experienced in the generation of 3D models by using AutoCAD Architecture, Revit Architecture, Civil 3D, BIM, Sketch up Pro and Adobe Photoshop. Mr. Olmo has also been responsible for the field data collection of features and their representation on company projects including surveying drawings, civil engineering and land development project for our firm. Mr. Olmo serves as field technician and his attention to detail and ability to communicate effectively with other team members makes him an asset for all our projects. KEY EXPERIENCE Citywide CIP Water & Sewer Improvement Surveys, City of Opa-Locka, FL This project includes the topographic route surveys for over 200,000 LF of roadway to receive water and sewer improvements as part of the Capital Improvements Program (CIP) throughout the City of Opa-Locka. PDS is part of the Team to provide design criteria packages for the letting of this work. Mr. Olmo was the crew lead to collect all the invert elevations, direction and bottom elevations of all drainage structures and sanitary sewer structures within the project. Mr. Olmo was also responsible for locating lot corners and establishing property lines and right of way lines based on plat records and available information. Mr. Olmo also assisted in collecting all above ground features, elevations and commanding a second crew as needed to meet project schedules. Various Roadway Intersections Surveys, Miami-Dade County, FL This project was to provide roadway intersection improvements at five different roadway intersections throughout Miami-Dade County. Mr. Olmo was tasked with collecting field data and drafting the topographic surveys which required the completion of five separated Specific Purpose Surveys with a very aggressive schedule. Each location included all visible relevant topographic features along the proposed site area, Right-Of-Way research and preparation, plat research and the submittal drawing was required to follow standards provided by the Client, including layers, line weights, colors, symbols, as required by Miami-Dade County. Medley Fire rescue Facility Survey, Medley, Miami-Dade County, FL This project was to replace the perimeter fence after the existing fence was damaged by recent storm events. The project site was an existing and Active Fire rescue Facility, of about 6.4 Acres, owned and maintained by Miami-Dade County. A field work for the specific purpose survey was conducted by Mr. Olmo, which included all visible relevant topographic features along the proposed site boundary, physical boundary demarcations, legal description, marking property corners, existing property lines and recorded easements and plat information as available in readily available public information records. Mr. Olmo also prepared CAD drawings for preparation of drawing deliverables. Cairo Ln Topographic Survey, City of Opa-Locka, FL - This project was an emergency project to conduct a topographic survey of 2,600LF of roadway in the City of Opa-Locka. Project included the collection of all above ground features, spot elevations, recording of existing roadway conditions, and depiction of right-or- ways along this corridor. Mr. Olmo assisted in the collection of field data, and was responsible for generating the CAD drawings for this project. 208 JORGE MICHEL OLMO SURVEY FIELD TECHNICIAN ADA Compliant Bus Stop Improvement, Town of Miami Lakes, FL - Mr. Olmo was filed data collector utilizing GPS and Digital Data collector and project CAD drafter for this project which included the filed data collection, topographic survey, scope determination and the generation of demolition, new construction, and maintenance of traffic plans. Project provided the client with the design for ADA improvements to 19 bus stops locations, new bus shelters, concrete pads, sidewalks and amenities. Project included the coordination with Town, Miami-Dade Transit, conduct underground utility investigations and permitting. Saint Agnes Residential Development Survey, City of Miami, FL – Mr. Olmo was the field crew leader on the field data collection of all above ground features along the perimeter of this residential development on a 10 acre lot, for the installation of a perimeter fence. Mr. Olmo was responsible to collect lot corners, existing benchmarks, all above ground features and collect plat information to determine ROW and property lines. Project included boundary survey and a detailed survey of the entrance area for future development. Project was provided in state plane coordinates and NAVD 88 vertical datum. Alaqua Drainage Survey, City of Aventura, FL - Mr. Olmo was the crew field leader on the field data collection of all above ground features and underground drainage system information within the 5 acre lot of this residential high rise condominium building. Mr. Olmo was responsible to collect lot corners, existing benchmarks, all above ground features and collect plat information to determine ROW and property lines. In addition, Mr. Olmo was responsible to open all drainage structures, collect pictures, bottom elevation, invert elevation, pipe size material and direction and note general condition of drainage components. Project was provided in state plane coordinates and NAVD 88 vertical datum. Sidewalk Assessment and GIS Representation, City of Fort Lauderdale, Broward County – This project consisted in field data collection and assessment of the existing condition of all the existing sidewalks within the City of Fort Lauderdale, which consist of over 400 miles of sidewalks. Mr. Olmo was responsible for field data collection utilizing GPS devices that would later sync data collected with the GIS application developed for this project. Mr. Olmo assisted in the calculation of progress utilizing GIS tools build into the GIS system. FDOT District 4, Broward County Transit Bus Shelter Project, Broward County, Florida. This Design- Build project consists of providing ADA compliant bus shelters to 73 locations throughout the cities of Wilton Manors, Oakland Park and Pompano Beach, in Broward County. This project required the coordination between the design team consisting of civil engineers, structural engineers, electrical engineers, shelter manufacturer and our surveying team. Mr. Olmo assisted the field crew on this project by helping in the field data collection operation to be able to meet the strict schedule requirements set by the Design-Build Team. Water and Sewer Service Connection and Pump Station for Car Dealership, City of North Miami, FL – This project included the design of a new water and sewer connection for the development of a commercial site to house a new Car Dealership for Warren henry in North Miami, including the design of a new wastewater pump station rated at 65 gpm. Mr. Olmo conducted site verification services, including the location of above ground features, performed underground utility locations and recorded locations based on painted marking in the field. Mr. Olmo prepared CAD drawings depicting exiting conditions and proposed designs. Volume Determination Survey, Biscayne Landing, North Miami, FL. - Mr. Olmo has assisted as field data collector and has participated in the generation of CAD drawings for the collection of elevations required for the calculation of stock pile and lakes volumes within the boundaries of a mixed used development project currently under construction in North Miami known as Biscayne Landing. Project includes the collection of field data, location of benchmarks, generation of contours and volume calculations. NE 10th Street & NE 7th Avenue Improvements in Dania Beach, FL. Project consists of extension of NE 10th Street to the east to intersect with NE 7th Avenue and reconstruction of NE 7th Avenue from this intersection to the north to the intersection of Taylor Road. Project proposed water and sewer improvements along these roadway corridors. Tasks included topographic surveys, design of Civil plans, Utility coordination and worked with Broward County Environmental Regulation Division, Broward County Health Department and City of Dania Beach for Project permitting. Mr. Olmo was responsible for generation of As-Built drawings for water and sewer utilities on this project. 209 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Fernando Fernandez. PSM 13. ROLE IN THIS CONTRACT Chief Surveyor 14. YEARS EXPERIENCE a. TOTAL 25 b. WITH CURRENT FIRM 8 15. FIRM NAME AND LOCATION (City and State) Premiere Design Solutions, Inc. – North Miami, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) B.S. Hydrology Engineering, Alma-Alta, Former USSR 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Land Surveyor & Mapper LS No. 6765 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Hard Rock Stadium Pedestrian Bridges and Tunnels, City of Miami Gardens, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) 2020 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. Fernandez was the Survey Party Chief for the preparation of specific purpose surveys at four locations at the Hard Rock Stadium, for a very aggressive schedule project to build two pedestrian bridges and two pedestrian tunnels at the Stadium in anticipation of the Superbowl LIV. Project also included the drafting and preparation of legal description and sketches for the dedication of land and aerial easements for the new structures in private property. The project total cost is $16 Millions. b. (1) TITLE AND LOCATION (City and State) Roadway Segment Surveying Services for DCP, City of Miami, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. Fernandez was Chief Surveyor responsible to provide over 15,000 LF of roadway surveys from Right-of-way (ROW) to ROW on city street segments, including all above ground features, elevations cross sections at every 100’, collection of all above ground features within survey area, including information for sanitary sewer and drainage structures such as bottom, invert, size and direction. Mr. Fernandez scheduled the crews, and performed QA/QC reviews of survey drawings and provided signed and sealed drawings of survey. c. (1) TITLE AND LOCATION (City and State) Various Roadway Intersections Surveys, Miami-Dade County, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm This project was to provide roadway intersection improvements at five different roadway intersections throughout Miami-Dade County. Mr. Fernandez was tasked with the topographic surveys which required the completion of five separated Specific Purpose Surveys with a very aggressive schedule. Each location included all visible relevant topographic features along the proposed site area, Right-Of-Way research and preparation, plat research and the submittal drawing was required to follow standards provided by the Client, including layers, line weights, colors, symbols, etc, as required by Miami-Dade County. Mr. Fernandez led the field crew in the data collection and was responsible for the generation of survey drawing deliverables d. (1) TITLE AND LOCATION (City and State) City-Wide Roadway Topographic Surveys for CIP Projects, City of Opa-Locka, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. Fernandez was the Chief Surveyor in this project to conduct City-wide surveys on 200,000 LF of roadways as part of the CIP program to improve water and sewer infrastructure and provide additional stormwater management, with a very aggressive completion schedule. This project has been performed by Mr. Fernandez with the latest GPS equipment and data collectors, coordinating field crews and office drafting work to meet the very demanding client schedule of completion. Surveys include ROW to ROW above ground features, drainage and wastewater structure information, drainage and sewer structure information, delineation of plats and generating survey drawings. e. (1) TITLE AND LOCATION (City and State) Biscayne Landing Engineering and Surveying Support, North Miami, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (If applicable) 2020 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. Fernandez is the Survey Crew Party Chief in this project to provide development support to the Owner. Project included the determination of volume of crushed concrete material stockpiled at the Biscayne Landings construction site and volume of lakes to be filled. Mr. Fernandez coordinated survey crews to obtain horizontal and vertical data of the location and elevation of the stockpiled material and lake soundings. With the information of the points collected in the field utilizing cross sections no longer than 25’, information was migrated into AutoCAD Civil 3D to generate a Digital Terrain Model (DTM) with the information collected from the field, generating surfaces for the existing ground and for the surface area of each of the five stock pile mounds located at the construction site. The DTM was used to determine the volume between the two surfaces, and to generate cross sections of the stock piles at constant intervals. Volume calculation plans and reports were created with plan view, cross sections and volume calculation data. 210 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Luis J. Jurado, P.E. 13. ROLE IN THIS CONTRACT Survey Principal / QA/QC 14. YEARS EXPERIENCE a. TOTAL 17 b. WITH CURRENT FIRM 13 15. FIRM NAME AND LOCATION (City and State) Premiere Design Solutions, Inc. – North Miami, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) B.S. Civil Engineering, University of North Carolina at Charlotte 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Engineer Florida No.66396 - South Carolina No. 28394 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Florida Engineering Society, National Society of Professional Engineers, ASCE Member 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Broward County Transit – Professional Services Agreement in an Ongoing Basis, Broward County, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm The Transit Infrastructure & Shelter Improvement at Bus Stops is a multi-year project consisting of improving transit facilities throughout Broward County. The scope of work for this project can be subdivided into ADA Improvements at Bus Stops, Bus Shelter Expansion Program, Bus Bay Enhancements and Transit Terminal Improvements. For these projects, Mr. Jurado has served as project director and Engineer of Record for most of the work provided under this contract including land surveying, conducted site condition assessments, engineering design, and permitting coordination for sidewalk repair and improvements projects at over 1,000 locations throughout Broward County, including ADA compliant pedestrian curb ramps, new bus shelter site design maintaining proper sight triangle, ADA Accessibility and pedestrian safety. b. (1) TITLE AND LOCATION (City and State) FDOT Minor Highway Transit Enhancements, Broward County, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION (If applicable) 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Project included design services, permitting and construction management services for the improvement at 73 locations along FDOT right-of-way in Broward County, FL. This Design-Build Project included the enhancement of transit facilities, including ADA improvements, utility coordination, civil design, permitting and construction inspections. This project also included the design of custom made state of the art bus shelter facilities to replace exiting or be added at these locations. Mr. Jurado was responsible for presenting a work program to ensure completion within the expected Client’s schedule, project team coordination and rigorous quality control. The project total cost was $2.5 Million. c. (1) TITLE AND LOCATION (City and State) Citywide Sidewalk Assessment Survey, City of Fort Lauderdale, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2014 CONSTRUCTION (If applicable) 2015 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm As part of the comprehensive effort to address resident’s concerns, the City has embarked on a citywide Sidewalk Assessment Program. The work included a GIS inventory of all 420 miles of City-owned sidewalks and an interactive report with sidewalk deficiency, photo and GIS location, type, and length of damage. Mr. Jurado was responsible for the coordination of work, training and field data collection of filed survey activities, and assisted field crews in the collection of data and assessing the existing condition of miles of existing sidewalks and pedestrian curb ramps. d. (1) TITLE AND LOCATION (City and State) City-Wide Roadway Topographic Surveys for CIP Projects, City of Opa-Locka, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. Jurado was the Project Principal for this surveying project to conduct City-wide surveys on 200,000 LF of roadways as part of the CIP program to improve water and sewer infrastructure and provide additional stormwater management. This project has been performed with the latest GPS equipment and data collectors, coordinating field crews and office drafting work to meet the very demanding client schedule of completion. Surveys include ROW to ROW above ground features, drainage and wastewater structure information, delineation of plats and generating survey drawings. Mr. Jurado coordinated deliverables with client and conducted deliverable QA/QC reviews of project deliverables and coordinated comment resolution from client and owner. e. (1) TITLE AND LOCATION (City and State) GIS Services for Miami Springs Infrastructure for MDWASD, Miami-Dade Water and Sewer, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2011 CONSTRUCTION (If applicable) 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. Jurado was the Project Coordinator for implementation of the Department’s GIS system for water and sewer infrastructure, with the priority of Miami Springs acquired utilities. To achieve this, Mr. Eckardt oversaw six GIS Specialists working at WASD entering water and sewer information into the WASD GIS System with GAMS and EAMS. Project also includes field data collection and as-built plans research to collect all the required information necessary for the input of all water and sewer infrastructure in Miami Springs. 211 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Gustavo A. Eckardt. P.E. 13. ROLE IN THIS CONTRACT Project Manager 14. YEARS EXPERIENCE a. TOTAL 18 b. WITH CURRENT FIRM 10 15. FIRM NAME AND LOCATION (City and State) Premiere Design Solutions, Inc. – North Miami, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) B.S. Civil Engineering, University of North Carolina at Charlotte 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Engineer Florida No.67553 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Florida Engineering Society, Chi Epsilon Civil Engineering Honor Society, National Society of Professional Engineers, Primavera P3 Scheduling Training, MOT Training Course 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Hard Rock Stadium Pedestrian Bridges and Tunnels, City of Miami Gardens, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) 2020 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. Eckardt was the project manager and engineer of record for this project which the preparation of specific purpose surveys at four locations at the Hard Rock Stadium, drainage design and underground utility investigation and design. The project had a very aggressive schedule, requiring to build two pedestrian bridges and two pedestrian tunnels at the Stadium in anticipation of the Superbowl LIV. Project also included the drafting and preparation of legal description and sketches for the dedication of land and aerial easements for the new structures in private property. The project total cost is $16 Millions. b. (1) TITLE AND LOCATION (City and State) Roadway Segment Surveying Services for DCP, City of Miami, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. Eckardt was the Project Manager for the preparation of over 15,000 LF of roadway surveys from Right-of-way (ROW) to ROW on city of Miami 30 independent street segments, including collection of all above ground features, elevations cross sections at every 100’, including information for sanitary sewer and drainage structures such as bottom, invert, size and direction. Mr. Eckardt coordinated with client delivery schedules and assigned survey crews to meet the aggressive schedule. Mr. Eckardt also conducted QA/QC reviews of deliverables and coordinated the resolution of client comments and requests on survey drawings. c. (1) TITLE AND LOCATION (City and State) Broward County Transit – Professional Services Agreement in an Ongoing Basis, Broward County, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm The Transit Infrastructure & Shelter Improvement at Bus Stops is a multi-year project consisting of improving transit facilities throughout Broward County. The scope of work for this project can be subdivided into ADA Improvements at Bus Stops, Bus Shelter Expansion Program, Bus Bay Enhancements and Transit Terminal Improvements. For these projects, Mr. Eckardt has provided surveying coordination, site condition assessments, engineering support, design and permitting coordination for sidewalk repair and improvements projects at over 1,000 locations, including ADA compliant pedestrian curb ramps, new bus shelter site design maintaining proper sight triangle, ADA Accessibility and pedestrian safety. d. (1) TITLE AND LOCATION (City and State) City-Wide Roadway Topographic Surveys for CIP Projects, City of Opa-Locka, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. Eckardt was the Project Manager for this surveying project to conduct City-wide surveys on 200,000 LF of roadways as part of the CIP program to improve water and sewer infrastructure and provide additional stormwater management. This project has been performed with the latest GPS equipment and data collectors, coordinating field crews and office drafting work to meet the very demanding client schedule of completion. Surveys include ROW to ROW above ground features, drainage and wastewater structure information, delineation of plats and generating survey drawings. Mr. Eckardt has been responsible for coordinating field crew schedule and ensure completion dates are met as required by client. e. (1) TITLE AND LOCATION (City and State) GIS Services for Miami Springs Infrastructure for MDWASD, Miami-Dade Water and Sewer, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2011 CONSTRUCTION (If applicable) 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. Eckardt was the Project Manager for implementation of the Department’s GIS system for water and sewer infrastructure, with the priority of Miami Springs acquired utilities. To achieve this, Mr. Eckardt oversaw six GIS Specialists working at WASD entering water and sewer information into the WASD GIS System with GAMS and EAMS. Project also includes field data collection and as-built plans research to collect all the required information necessary for the input of all water and sewer infrastructure in Miami Springs. 212 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Jorge Michel Olmo 13. ROLE IN THIS CONTRACT Chief Surveyor 14. YEARS EXPERIENCE a. TOTAL 20 b. WITH CURRENT FIRM 7 15. FIRM NAME AND LOCATION (City and State) Premiere Design Solutions, Inc. – North Miami, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) B.A. Architecture, Central University of Villa Clara, Cuba 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Specialized Computer Aided Design & Drafting, Autodesk Technical Institute, Malaga, Spain 2010 Online Web Courses – Implementing New CAD Techniques (Tips and Shortcuts / Last Versions) 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Hard Rock Stadium Pedestrian Bridges and Tunnels, City of Miami Gardens, Florida. (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) 2020 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. Olmo was Survey crew lead for the preparation of specific purpose surveys at four locations at the Hard Rock Stadium, for a very aggressive schedule project to build two pedestrian bridges and two pedestrian tunnels at the Stadium in anticipation of the Superbowl LIV. Mr. Olmo collected above ground and aerial features for the project area and included utility information such as manhole inverts, above ground signs, valves, ground cover, elevations, etc The project total cost is $16 Millions. b. (1) TITLE AND LOCATION (City and State) Sidewalk Assessment and GIS Representation, City of Fort Lauderdale, Broward County (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm This project consisted in field data collection and assessment of the existing condition of all the existing sidewalks within the City of Fort Lauderdale, which consists of over 400 miles of concrete sidewalks. Mr. Olmo was responsible for field data collection utilizing GPS devices, with picture taking capabilities, that would later sync data collected with the GIS application developed for this project. Mr. Olmo assisted in the calculation of progress utilizing GIS tools build into the GIS application. c. (1) TITLE AND LOCATION (City and State) Roadway Segment Surveying Services for DCP, City of Miami, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Mr. Olmo was Crew Party Chief responsible to collect field data of over 15,000 LF of roadway surveys from Right-of-way (ROW) to ROW on city street segments, including all above ground features, elevations cross sections at every 100’, collection of all above ground features within survey area, including information for sanitary sewer and drainage structures such as bottom, invert, size and direction. Mr. Olmo led his crews to collect data necessary for developing survey drawings including elevations to develop a digital terrain model of all street segments and created and set baselines along all of the 3o roadway segments surveyed and included in this project. d. (1) TITLE AND LOCATION (City and State) City-Wide Roadway Topographic Surveys for CIP Projects, City of Opa-Locka, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm This project includes the topographic route surveys for over 200,000 LF of roadway to receive water and sewer improvements as part of the Capital Improvements Program (CIP) throughout the City of Opa-Locka. PDS is part of the Team to provide design criteria packages for the letting of this work. Mr. Olmo was the crew lead to collect all the invert elevations, direction and bottom elevations of all drainage structures and sanitary sewer structures within the project. Mr. Olmo was also responsible for locating lot corners and establishing property lines and right of way lines based on plat records and available information. Mr. Olmo also assisted in collecting all above ground features, elevations and commanding a second crew as needed to meet project schedules. e. (1) TITLE AND LOCATION (City and State) Various Roadway Intersections Surveys, Miami-Dade County, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm This project was to provide roadway intersection improvements at five different roadway intersections throughout Miami-Dade County. Mr. Olmo was tasked with collecting field data and drafting the topographic surveys which required the completion of five separated Specific Purpose Surveys with a very aggressive schedule. Each location included all visible relevant topographic features along the proposed site area, Right-Of-Way research and preparation, plat research and the submittal drawing was required to follow standards provided by the Client, including layers, line weights, colors, symbols, as required. 213 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Henry Rivera 13. ROLE IN THIS CONTRACT Survey Crew / CAD Manager 14. YEARS EXPERIENCE a. TOTAL 40 b. WITH CURRENT FIRM 12 15. FIRM NAME AND LOCATION (City and State) Premiere Design Solutions, Inc. – North Miami, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) B.S. Industrial Engineering, Santander Industrial University, Bucaramanga, Colombia 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Master of Science in Industrial Engineering, University of Pittsburgh, 1978 Master of Science in Mathematical Statistics University of Chile, Santiago de Chile, Chile 1971 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Broward County Transit – Professional Services Agreement in an Ongoing Basis, Broward County, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm This project is a multi-year project consisting of designing Transit Improvements throughout Broward County that are to be compliant with ADA guidelines and regulations. One of the main objectives of the program is to provide ADA accessibility to thousands of bus stops within the County. The project includes surveying, engineering design for improvements such as landing pads, shelter pads, curb & gutter, sidewalk restoration, sidewalk transitions, etc. Mr. Rivera’s duties and responsibilities include the preparation of topographic surveys and hundredths of locations and assist with the computer generated drawings and engineering design drawings utilizing AutoCAD Civil 3D. b. (1) TITLE AND LOCATION (City and State) Sidewalk Assessment and GIS Representation, City of Fort Lauderdale, Broward County (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm This project consisted in field data collection and assessment of the existing condition of all the existing sidewalks within the City of Fort Lauderdale, which consists of over 400 miles of concrete sidewalks. Mr. Rivera was responsible for field data collection utilizing GPS devices, with picture taking capabilities, that would later sync data collected with the GIS application developed for this project. Mr. Rivera conducted staff training on new data collection devices and personally assisted in the calculation of progress utilizing GIS tools build into the GIS application. c. (1) TITLE AND LOCATION (City and State) FDOT District 4, Broward County Transit Bus Shelter Project, Broward County, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION (If applicable) 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm This Design-Build project consists of providing ADA compliant bus shelters to 73 locations throughout the cities of Wilton Manors, Oakland Park and Pompano Beach, in Broward County. Mr. Rivera was the CAD Manager on this project responsible for setting up all drawings on this project, including topographic surveys and engineering drawings. This project required the coordination between the design team consisting of civil engineers, structural engineers, electrical engineers, shelter manufacturer and our surveying team. Mr. Rivera also assisted the field crew on this project by helping in the field data collection operation to be able to meet the strict schedule requirements set by the Design-Build Team. d. (1) TITLE AND LOCATION (City and State) City-Wide Roadway Topographic Surveys for CIP Projects, City of Opa-Locka, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm This project included the topographic route surveys for over 200,000 LF of roadway to receive water and sewer improvements as part of the Capital Improvements Program (CIP) throughout the City of Opa-Locka. Mr. Rivera assisted in field data collection as survey crew member, and later on the drafting of collected data and the production of survey drawings, representing all ROW data, property information, above ground features, manholes and elevations. e. (1) TITLE AND LOCATION (City and State) Various Roadway Intersections Surveys, Miami-Dade County, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm This project was to provide roadway intersection improvements at five different roadway intersections throughout Miami-Dade County. Mr. Rivera was tasked with collecting field data and drafting the topographic surveys which required the completion of five separated Specific Purpose Surveys with a very aggressive schedule. Each location included all visible relevant topographic features along the proposed site area, Right-Of-Way research and preparation, plat research and the submittal drawing was required to follow standards provided by the Client, including layers, line weights, colors, symbols, as required. 214 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 1 21. TITLE AND LOCATION (City and State) CIP Citywide Topographic ROW Surveys 22. YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (If applicable) N/A 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Opa-Locka b. POINT OF CONTACT NAME Carlos Gonzalez c. POINT OF CONTACT TELEPHONE NUMBER 305-206-0279 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Premiere Design Solutions, Inc. (2) FIRM LOCATION (City and State) Weston, FL (3) ROLE Surveying b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Premiere Design Solutions, Inc. (PDS) served as the Design Criteria Package Topographic Surveyor for the City of Opa-Locka and their Capital Improvement Plan, to bring water, wastewater and stormwater improvements throughout the City. Survey work included the collection of all above ground features, topographic elevation cross sections, research and placement of monument, Right of Way, Easement and Center Lines, draft plats, and generate layered assets in AutoCAD software to represent field data collected. This project included the topographic route surveys for over 200,000 LF of roadway to receive water and sewer improvements as part of the Capital Improvements Program (CIP) throughout the City of Opa-Locka, and requires PDS to complete all surveys with a very aggressive schedule, in order to meet scheduled deadlines and limited funding. PDS participation on this project nearly saved the City half the budget destined to surveying, while being able to meet the aggressive schedule. PDS crews utilized state of the art, and the latest model of GPS rover and Data Collectors available in the market, to deliver high quality data at production speeds. Project was completed within schedule and under budget. Premiere Design Solution’s role in the project is: Plat research and drafting for ROW verification. Field Data Collection with GPS units Open all Manholes and Catch Basins to provide client with invert pipe information Cross sectional elevations from ROW to ROW of roadway to generate topographic cross sections Prepare key map and citywide survey drawings Obtain topographic data of horizontal and vertical location of all above ground features Identified easements available in county property records Coordination between City, Engineering Consultant and Survey Field Crews 215 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 2 21. TITLE AND LOCATION (City and State) Biscayne Landing DTM, Engineering and Surveying Support 22. YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (If applicable) 2020 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER Swerdlow Development b. POINT OF CONTACT NAME Darryl Lee, P.E., LEED AP c. POINT OF CONTACT TELEPHONE NUMBER 305-442-6531 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Premiere Design Solutions, Inc. (2) FIRM LOCATION (City and State) North Miami, FL (3) ROLE Engineering During Construction, Permitting & Surveying b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Premiere Design Solutions, Inc. (PDS) serves as part of the Engineering and Surveying team for this project which includes the design and construction administration of site grading work and new spine road throughout the site. PDS tasks include the permitting assistance, engineering inspections and filed data collection, computer drafting, digital terrain modeling (DTM), topographic survey, volume calculations and report preparation including cross sections of crushed concrete stock piles and existing lake volumes. PDS was contracted to determine the volume of crushed concrete material stockpiled at the Biscayne Landings construction site and volume of lakes to be filled. PDS coordinated in-house survey crew to obtain horizontal and vertical data of the location and elevation of the stockpiled material and lake soundings. With the information of the points collected in the field utilizing cross sections no longer than 25’, information was migrated into AutoCAD Civil 3D to generate a Digital Terrain Model (DTM) with the information collected from the field, generating surfaces for the existing ground and for the surface area of each of the five stock pile mounds located at the construction site. The DTM was used to determine the volume between the two surfaces, and to generate cross sections of the stock piles at constant intervals. Volume calculation plans and reports were created with plan view, cross sections and volume calculation data. Findings from our volume determination were used to determine payment quantities and to determine production rate adequacy by the owner. It was found that the Volume stock piled was considerably less than expected, so production of crushed concrete will have to increase to reach projected targets. Our services saved allowed our client to perform this task on budget and on schedule. This project was completed within the aggressive schedule required by the owner. 216 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 3 21. TITLE AND LOCATION (City and State) Hard Rock Stadium Pedestrian Bridges and Tunnels, City of Miami Gardens, Florida. 22. YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) 2020 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Miami Gardens. b. POINT OF CONTACT NAME Brenton Daily, P.E. Bentley Architects + Engineers, Inc. – Prime Consultant. c. POINT OF CONTACT TELEPHONE NUMBER (407) 331-6116 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Premiere Design Solutions, Inc. (2) FIRM LOCATION (City and State) North Miami, FL. (3) ROLE Civil Engineering and Surveying Services b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The City of Miami Gardens has engaged a Design/Build firm to design, permit and construct pedestrian improvements at the Hard Rock Stadium in the City of Miami Gardens, which shall be complete prior to a big event scheduled for February 2, 2020, with a total project cost of $16,000,000. Proposed pedestrian prefabricated metal bridge, fully enclosed with galvanized mesh, with minimum clearance of 17.5’, a span of approximately 145’, height of 15’ and 15’ of inside clear width, with concrete ramps and steps to provide ingress and egress to proposed pedestrian overpass. Proposed ramps and steps will be constructed in private land, which access to the public will be uninterrupted, open 24 hours a day and an easement granted to the City of Miami Gardens to place proposed ramps in public land. Premiere Design Solutions Staff’s Task in the project is: Topographic Survey Easement Preparation and Coordination Stormwater Management Design Permitting Utility Design and Coordination. 217 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 4 21. TITLE AND LOCATION (City and State) Various Roadway Intersection Surveys 22. YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) N/A 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Fort Lauderdale b. POINT OF CONTACT NAME Victor Herrera, PE c. POINT OF CONTACT TELEPHONE NUMBER 786-412-4447 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Premiere Design Solutions, Inc. (2) FIRM LOCATION (City and State) North Miami, FL (3) ROLE GIS, Condition Assessment & Surveying b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The City of Fort Lauderdale is committed to being a fully connected city of tomorrow by 2035. This can only be achieved by providing safe, convenient, accessible, and comfortable connections. The 2013 Neighbor Survey results indicated that 52% of residents are satisfied with the availability of sidewalks in the City. Additionally, 29% of the residents responded that the maintenance of streets, sidewalks and infrastructure should receive the most emphasis from City leaders over the next two years. As part of the comprehensive effort to address resident’s concerns, the City has embarked on a citywide Sidewalk Assessment Program, utilizing a continuing services consultant contract with Atkins. Work performed under the consultant task order included a GIS inventory of all 420 miles of City-owned sidewalks and an interactive report with sidewalk deficiency, photo and GIS location, type, and length of damage. Premiere Design Solution’s role in the project: Equipment Coordination and Staff Training Project Scheduling and performance tracking Existing sidewalk condition assessment using GPS and Camera Equipped data collectors Assessment included ADA deficiencies and condition verification QA/QC of data collected and Coordinated re-assessment of data as required Premiere Design Solutions, Inc (PDS) served as a sub-consultant to ATKINS on this program and was responsible for providing all of the filed inspection and sidewalk condition assessment of the 420 miles of city sidewalks. Work included the coordination and training of field staff in the use of project equipment, such as the Trimble Geo 7 Series and the criteria dictated by the client in the categorization, prioritization and levels required by the project. Assessment included the identification of ADA non-conformances, unsafe sidewalks, cracks and damages. PDS also provided scheduling and coordination of field crews conducting the condition assessment in order to meet the client’s delivery schedule. Data collected was uploaded to the Clients Server for report generation. PDS also conducted Quality Control on data collected, reports and images, and conducted verification of flagged areas. 218 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 5 21. TITLE AND LOCATION (City and State) Various Roadway Intersection Surveys 22. YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) N/A 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER Miami-Dade County b. POINT OF CONTACT NAME Luis Lacau c. POINT OF CONTACT TELEPHONE NUMBER 305-375-5774 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Premiere Design Solutions, Inc. (2) FIRM LOCATION (City and State) North Miami, FL (3) ROLE Land Surveying b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Premiere Design Solutions, Inc. (PDS) served as the Topographic Surveyor Consultant for Miami-Dade County under the Miami-Dade County Surveying Pool contract for the completion of the surveying portion of this project. The project intent was to provide roadway intersection improvements at five different roadway intersections. PDS was tasked with the topographic surveys required for the project, which required the completion of five separated Specific Purpose Surveys, one for each intersection, but each had to include all visible relevant topographic features along the proposed site area, Right-Of-Way research and preparation, plat research and the submittal drawing was required to follow standards provided by the Client, including layers, line weights, colors, symbols, etc, as required by Miami-Dade County. The project had a very aggressive timeline to meet scheduling requirements, and PDS utilized multiple crews to be able to finalize the topographic surveys within 30 days of work order notice, and worked at risk prior to obtaining final approvals to be able to complete the project in time. Locations Surveyed included: Location Name: 2258 – Coral Way and SW 2 Av Location Name: 2731 – Jefferson Av and 16 St Location Name: 2111 – NE 4 Ct and NE 61 St Location Name: 2488 – NW 22 Av & NW 62 St Location Name: 2768 – Pennsylvania Av and 14 St PDS completed the following scope at each location: 1.Established centerlines of rights of way, based on existing Plats 2.Showed right of way lines as per Public Records for the project area 3.Established physical control baseline using the center lines of the right of ways 4.Established a site benchmark in NGVD 1929 elevation datum 5.Located all topographic data for approximately 50 beyond the PC’s 6.All drainage structures including the size, pipes inverts, elevations and sizes 7.Located all existing mast arm including lengths, height and sizes 8.Elevation Cross section data every 25’ 9.Data delivered in state plane coordinates and aerial photographs 10.Signed and sealed Topographic Survey in a Scale of 1” = 20’ 11.Located all overhead wires and ground clearance at the Max. sag point. 12.Digital Cad drawing submittal prepared in 2014 Auto Cad version 219 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 6 21. TITLE AND LOCATION (City and State) Roadway Segment Surveying Services for DCP, City of Miami, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) N/A 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Miami b. POINT OF CONTACT NAME Richard Burgess, P.E. c. POINT OF CONTACT TELEPHONE NUMBER 305-670-2350 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Premiere Design Solutions, Inc. (2) FIRM LOCATION (City and State) North Miami, FL (3) ROLE Survey b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The City of Miami is preparing Design Criteria Packages (DCP) for a project to provide roadway, pavement and drainage improvements at 30 roadway segments throughout the City. Premiere Design Solutions (PDS) has been selected, as a subconsultant to BCC Engineering, to provide all of the Land Surveying and Topographic surveys required for this project. The scope of work included over 15,000 LF of roadway surveys from Right-of-way (ROW) to ROW on city street segments, including all above ground features, elevations cross sections at every 100’, collection of all above ground features within survey area, including information for sanitary sewer and drainage structures such as bottom, invert, size and direction. Surveys where drafted in AutoCAD format, including all collected data, baselines for roadway segments under the supervision of a Florida Registered Land Surveyor. Above ground utilities and structures: pull boxes, curbs, poles, overhead lines, water meters, mailboxes, parking meters, decorative pavement, pavers, driveways, etc. Elevation cross sections along the corridor at every 100’ intervals including Crown of road, edge of pavement, front of walk, back of walk, driveways and ramps, and center of swale up to 5' beyond right-of-way where possible. House address numbers, per Miami-Dade County property appraiser parcel information Lot Lines, roadway centerline and right-of-way lines (per plat records), Bearings and dimensions and right-of-way widths. Survey included elevations and delineation of visible areas of ponding. Rim/invert elevations pipe sizes and directions of all drainage structures within the Survey Limits. Location of trees identifying the type and trunk diameter. Point data and TIN Surface was be provided for Digital Terrain Model (DTM). Baselines where created and shown in surveys with individual numbering. Elevations were referenced to the City of Miami Datum. Project Horizontal Datum was referenced to NAD 83/2011. Side street surveys extended 100 feet past radius returns. 220 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 7 21. TITLE AND LOCATION (City and State) GIS Services for Miami Springs Infrastructure for MDWASD 22. YEAR COMPLETED PROFESSIONAL SERVICES 2011 CONSTRUCTION (If applicable) 2013 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER Miami-Dade Water & Sewer b. POINT OF CONTACT NAME Jose Lopez c. POINT OF CONTACT TELEPHONE NUMBER 786-552-8334 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Premiere Design Solutions, Inc. (2) FIRM LOCATION (City and State) North Miami, FL (3) ROLE GIS Services, Field Data Collection b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The Miami-Dade Water and Sewer Department (WASD) is one of the largest public utilities in the United States having more than 7,700 miles of underground water lines. On the wastewater side, there are about 6,200 miles of sewer lines. WASD provides service to over 2.4 million customers. Approximately 330 million gallons of water are drawn every day from the Biscayne Aquifer for consumer use with a service area of about 396 square miles and 14 potable water pump stations and about 1,000 sewer pump stations. In 2008, the entire water and sewer infrastructure serving Miami Springs was transferred to the Miami-Dade Water and Sewer Department, adding to the system an area of about 80 Million SF with 4,000 costumers, representing about 90,000 Gals of water usage per quarter. PDS worked with WASD to provide support services for implementation of the Department’s GIS system for water and sewer infrastructure, with the priority of Miami Springs acquired utilities. To achieve this, PDS had six GIS Specialists working at WASD entering water and sewer information into the WASD GIS System with GAMS and EAMS. Project also includes field data collection and as-built plans research to collect all the required information necessary for the input of all water and sewer infrastructure in Miami Springs. This project will allow Miami Springs Infrastructure to be added to the system and in the end, help with new system installations and to rapidly pinpoint the location of equipment that requires repair or upgrading, as well as to more quickly identify the facilities associated with and properties affected by outages, water leaks and other service problems or emergencies. Premiere Design Solutions Staff’s role in the project is: •Use ArcGIS 10 custom program to enter new projects into the GIS layers •Use Arc GIS 10 to research reported problems with GIS and/or as-builts and correct them •Use ArcGIS 10 and/or custom ESRI AML program to validate and modify GIS layers •Read water/wastewater as-builts to investigate and resolve potential inconsistencies in the data •Run and interpret error reports and perform QA/QC on GIS input data •Perform visual, tabular, and geographic checks on GIS layers •Field collection and research of additional information •Communicate with County personnel to resolve issues with and Maintain GIS data 221 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 8 21. TITLE AND LOCATION (City and State) Broward County Transit – Professional Services Agreement in an Ongoing Basis, Broward County, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) 2019 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER Broward County Transit b. POINT OF CONTACT NAME Arethia Douglas, P.E. c. POINT OF CONTACT TELEPHONE NUMBER 954-357-8375 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Premiere Design Solutions, Inc. (2) FIRM LOCATION (City and State) North Miami, FL (3) ROLE Civil Design, Permitting & Surveying b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Premiere Design Solutions, Inc (PDS) served as the prime consultant responsible for providing professional engineering, surveying and permitting services to the Broward County Transit Department (BCTD) for ADA improvements for transit facilities and new bus shelters at thousands of locations throughout Broward County, Florida. PDS’s responsibilities for this project included preparation of surveys, site condition assessments, geotechnical investigations, civil engineering design, structural engineering design, landscape design, electrical and photometric design, permit preparation and processing, modification of permits acquired by the BCTD, maintenance of traffic plans, utility relocations coordination and construction management. The PDS professional staff designed over 1,000 bus stops including but not limited to bus stops, bus shelters, bus bays, bike lanes, curb and gutter, landing pads, sidewalk connectors, new sidewalks, handicap ramps, stormwater improvements and bus shelter pads. In addition, PDS prepared paving, grading and drainage plans to depict proper stormwater conveyance and retention as per the proposed improvements. The utility coordination for this project was very rigorous since many of the bus stops were located within high dense urban areas with reduced right-of-way space. In order to accommodate the proposed improvements, PDS successfully relocated or coordinated relocations of many utilities including potable water, wastewater, electrical, traffic, power, telecommunications, and others. 222 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 9 21. TITLE AND LOCATION (City and State) FDOT Minor Highway Transit Enhancements, Broward County, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION (If applicable) 2013 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER FDOT District 4 b. POINT OF CONTACT NAME Scott Peterson, P.E. c. POINT OF CONTACT TELEPHONE NUMBER 954-777-4416 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Premiere Design Solutions, Inc. (2) FIRM LOCATION (City and State) Weston, FL (3) ROLE Planning, Civil Engineering, Permitting, Surveying & Construction Support b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The FDOT Bus Shelter project is a project consisting of providing ADA compliant Bus Shelters and Transit Improvements to 73 locations throughout the cities of Wilton Manors, Oakland Park and Pompano Beach, all located in Broward County, FL while ensuring the conditions of the existing and proposed bus stops to be compliant with ADA guidelines and regulations. Premiere Design Solutions, Inc. (PDS) was the prime Planner and Designer in this 2.5 Million Design Build Project. The project scope included planning, civil, structural and electrical engineering design for the bus shelters to be installed at the current locations, as well as improvements at bus stops such as landing pads, curb & gutter, drainage improvements, utility coordination, sidewalk restoration, sidewalk transitions, and amenities such as benches, trash cans, solar panels, etc. PDS was also responsible for all utility coordination for this project and coordinated the design team consisting of civil engineers, structural engineers, electrical engineers and a surveying team. Duties included scheduling, permitting and quality control review prior to submittal, meeting with governmental agencies having jurisdiction over the project site location to discuss permitting requirements and issues. Project also included topographic surveys and As-Bults of completed improvements. 223 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 10 21. TITLE AND LOCATION (City and State) Bus Stop Improvements – City of Hallandale Beach 22. YEAR COMPLETED PROFESSIONAL SERVICES 2011 CONSTRUCTION (If applicable) 2012 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Hallandale Beach b. POINT OF CONTACT NAME Tony Gonzalez, P.E. c. POINT OF CONTACT TELEPHONE NUMBER 954-457-1385 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME Premiere Design Solutions, Inc. (2) FIRM LOCATION (City and State) North Miami, FL (3) ROLE Civil Design & Surveying b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Premiere Design Solutions, Inc (PDS) served as the prime consultant responsible for providing professional engineering, surveying and permitting services to the City of Hallandale Beach for ADA improvements at 26 bus stop locations within the City of Hallandale Beach. PDS’s responsibilities for this project included preparation of surveys, geotechnical investigations, civil engineering design, permit preparation and processing, modification of permits acquired by the BCTD (Broward County Transit Department) and construction management. The PDS professional staff designed over 1,220 linear feet of 6” thick concrete sidewalk, which included, but was not limited to modifying or adding new landing pads, connectors and handicap ramps. In addition, PDS prepared all of the Topographic Surveys for this project and prepared paving, grading and drainage plans to depict proper stormwater conveyance and retention as per the proposed improvements, which led to the inclusion of 4 FDOT approved Mitered Ends. The utility coordination for this project was very rigorous since many of the bus stops are located within high dense urban areas with reduced right-of-way space. PDS completed and followed closely the permitting process, going through the different agencies having jurisdiction over the area, incorporating the different standards and regulations that each agency required. 224 G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 1 2 3 4 5 6 7 8 9 10 STANDARD FORM 330 26. NAMES OF KEY PERSONNEL (From Section E, Block 12) 27. ROLE IN THIS CONTRACT (From Section E, Block 13)123 4 5 6 7 8 9 10 29. EXAMPLE PROJECTS KEY NO.TITLE OF EXAMPLE PROJECT (FROM SECTION F)NO.TITLE OF EXAMPLE PROJECT (FROM SECTION F) 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in "Example Projects Key" section below before completingtable. Place "X" under project key number for participation in same or similar role.) Fernando Fernandez. PSM Chief Surveyor ✘✘✘✘✘ ✘ Luis J. Jurado, P.E. Survey Principal / QA/QC ✘✘✘✘✘✘✘✘✘✘ Gustavo A. Eckardt. P.E. Project Manager ✘✘✘✘✘✘✘✘✘ ✘ Jorge Michel Olmo Chief Surveyor ✘✘✘✘✘ ✘ Henry Rivera Survey Crew/CAD Man. ✘✘✘✘✘✘ ✘✘✘ ✘ CIP Citywide Topographic ROW Surveys, 2015 Biscayne Landing DTM, Engineering and Surveying Support, 2015 Hard Rock Stadium Pedestrian Bridges and Tunnels, 2019 Various Roadway Intersection Surveys, City of Fort Lauderdale, 2019 Various Roadway Intersection Surveys, Miami-Dade County, 2019 Roadway Segment Surveying Services for DCP, 2020 GIS Services for Miami Springs Infrastructure for MDWASD, 2011 Broward County Transit – Professional Services Agreement, 2016 FDOT Minor Highway Transit Enhancements, 2010 Bus Stop Improvements, 2011 225 Section G Corporate Standing and Authorized Signatory RFQ No: 20-07-01 CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) 226 State of Florida Department of State I certify from the records of this office that PREMIERE DESIGN SOLUTIONS, INC is a corporation organized under the laws of the State of Florida, filed on June 19, 2007, effective June 18, 2007. The document number of this corporation is P07000070993. I further certify that said corporation has paid all fees due this office through December 31, 2020, that its most recent annual report/uniform business report was filed on January 24, 2020, and that its status is active. I further certify that said corporation has not filed Articles of Dissolution. Given under my hand and the Great Seal of the State of Florida at Tallahassee, the Capital, this the Twenty-fourth day of January, 2020 Tracking Number: 7376849953CC To authenticate this certificate,visit the following site,enter this number, and then follow the instructions displayed. https://services.sunbiz.org/Filings/CertificateOfStatus/CertificateAuthentication 227 Department of State / Division of Corporations / Search Records / Search by Entity Name / Document Number FEI/EIN Number Date Filed Effective Date State Status Last Event Event Date Filed Event Effective Date Detail by Entity Name Florida Profit Corporation PREMIERE DESIGN SOLUTIONS, INC Filing Information P07000070993 26-0571068 06/19/2007 06/18/2007 FL ACTIVE AMENDMENT 01/30/2013 NONE Principal Address 12781 MIRAMAR PKWY, STE 205 MIRAMAR, FL 33027 Changed: 10/09/2017 Mailing Address 130 E. Main Street Suite 200 ROCK HILL, SC 29730 Changed: 01/20/2014 Registered Agent Name & Address JURADO, LUIS J 12781 MIRAMAR PKWY, STE 205 MIRAMAR, FL 33027 Address Changed: 01/03/2018 Officer/Director Detail Name & Address D IVISION OF CORPORATIONSFlorida Department of State 228 Title Secretary RIVERA-JURADO, NATALIA 3030 Lakewood Drive Weston, FL 33332 Title President, CEO JURADO, LUIS J 3030 Lakewood Drive Weston, FL 33332 Title VP, CFO JURADO, JAIME 2030 LANDRY LANE ROCK HILL, SC 29732 Title Director FERNANDEZ, FERNANDO 1397 W 63 ST HIALEAH, FL 33012 Annual Reports Report Year Filed Date 2018 01/03/2018 2019 01/21/2019 2020 01/24/2020 Document Images 01/24/2020 -- ANNUAL REPORT View image in PDF format 01/21/2019 -- ANNUAL REPORT View image in PDF format 01/03/2018 -- ANNUAL REPORT View image in PDF format 01/17/2017 -- ANNUAL REPORT View image in PDF format 01/14/2016 -- ANNUAL REPORT View image in PDF format 07/29/2015 -- AMENDED ANNUAL REPORT View image in PDF format 01/09/2015 -- ANNUAL REPORT View image in PDF format 03/20/2014 -- AMENDED ANNUAL REPORT View image in PDF format 01/20/2014 -- ANNUAL REPORT View image in PDF format 01/30/2013 -- Amendment View image in PDF format 01/08/2013 -- ANNUAL REPORT View image in PDF format 01/06/2012 -- ANNUAL REPORT View image in PDF format 02/28/2011 -- ANNUAL REPORT View image in PDF format 07/21/2010 -- ADDRESS CHANGE View image in PDF format 01/05/2010 -- ANNUAL REPORT View image in PDF format 01/19/2009 -- ANNUAL REPORT View image in PDF format 229 01/19/2009 -- ANNUAL REPORT View image in PDF format 01/09/2008 -- ANNUAL REPORT View image in PDF format 11/13/2007 -- Amendment View image in PDF format 06/19/2007 -- Domestic Profit View image in PDF format Florida Department of State, Division of Corporations 230 Section H Forms and Attachments RFQ No: 20-07-01 CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) 231 Form W-9 (Rev. December 2014) Department of the Treasury Internal Revenue Service Request for Taxpayer Identification Number and Certification Give Form to the requester. Do not send to the IRS.Print or type See Specific Instructions on page 2.1 Name (as shown on your income tax return). Name is required on this line; do not leave this line blank. 2 Business name/disregarded entity name, if different from above 3 Check appropriate box for federal tax classification; check only one of the following seven boxes: Individual/sole proprietor or single-member LLC C Corporation S Corporation Partnership Trust/estate Limited liability company. Enter the tax classification (C=C corporation, S=S corporation, P=partnership) a Note. For a single-member LLC that is disregarded, do not check LLC; check the appropriate box in the line above for the tax classification of the single-member owner. Other (see instructions) a 4 Exemptions (codes apply only to certain entities, not individuals; see instructions on page 3): Exempt payee code (if any) Exemption from FATCA reporting code (if any) (Applies to accounts maintained outside the U.S.) 5 Address (number, street, and apt. or suite no.) 6 City, state, and ZIP code Requester’s name and address (optional) 7 List account number(s) here (optional) Part I Taxpayer Identification Number (TIN) Enter your TIN in the appropriate box. The TIN provided must match the name given on line 1 to avoid backup withholding. For individuals, this is generally your social security number (SSN). However, for a resident alien, sole proprietor, or disregarded entity, see the Part I instructions on page 3. For other entities, it is your employer identification number (EIN). If you do not have a number, see How to get a TIN on page 3. Note. If the account is in more than one name, see the instructions for line 1 and the chart on page 4 for guidelines on whose number to enter. Social security number –– or Employer identification number – Part II Certification Under penalties of perjury, I certify that: 1. The number shown on this form is my correct taxpayer identification number (or I am waiting for a number to be issued to me); and 2. I am not subject to backup withholding because: (a) I am exempt from backup withholding, or (b) I have not been notified by the Internal Revenue Service (IRS) that I am subject to backup withholding as a result of a failure to report all interest or dividends, or (c) the IRS has notified me that I am no longer subject to backup withholding; and 3. I am a U.S. citizen or other U.S. person (defined below); and 4. The FATCA code(s) entered on this form (if any) indicating that I am exempt from FATCA reporting is correct. Certification instructions. You must cross out item 2 above if you have been notified by the IRS that you are currently subject to backup withholding because you have failed to report all interest and dividends on your tax return. For real estate transactions, item 2 does not apply. For mortgage interest paid, acquisition or abandonment of secured property, cancellation of debt, contributions to an individual retirement arrangement (IRA), and generally, payments other than interest and dividends, you are not required to sign the certification, but you must provide your correct TIN. See the instructions on page 3. Sign Here Signature of U.S. person a Date a General Instructions Section references are to the Internal Revenue Code unless otherwise noted. Future developments. Information about developments affecting Form W-9 (such as legislation enacted after we release it) is at www.irs.gov/fw9. Purpose of Form An individual or entity (Form W-9 requester) who is required to file an information return with the IRS must obtain your correct taxpayer identification number (TIN) which may be your social security number (SSN), individual taxpayer identification number (ITIN), adoption taxpayer identification number (ATIN), or employer identification number (EIN), to report on an information return the amount paid to you, or other amount reportable on an information return. Examples of information returns include, but are not limited to, the following: • Form 1099-INT (interest earned or paid) • Form 1099-DIV (dividends, including those from stocks or mutual funds) • Form 1099-MISC (various types of income, prizes, awards, or gross proceeds) • Form 1099-B (stock or mutual fund sales and certain other transactions by brokers) • Form 1099-S (proceeds from real estate transactions) • Form 1099-K (merchant card and third party network transactions) • Form 1098 (home mortgage interest), 1098-E (student loan interest), 1098-T (tuition) • Form 1099-C (canceled debt) • Form 1099-A (acquisition or abandonment of secured property) Use Form W-9 only if you are a U.S. person (including a resident alien), to provide your correct TIN. If you do not return Form W-9 to the requester with a TIN, you might be subject to backup withholding. See What is backup withholding? on page 2. By signing the filled-out form, you: 1. Certify that the TIN you are giving is correct (or you are waiting for a number to be issued), 2. Certify that you are not subject to backup withholding, or 3. Claim exemption from backup withholding if you are a U.S. exempt payee. If applicable, you are also certifying that as a U.S. person, your allocable share of any partnership income from a U.S. trade or business is not subject to the withholding tax on foreign partners' share of effectively connected income, and 4. Certify that FATCA code(s) entered on this form (if any) indicating that you are exempt from the FATCA reporting, is correct. See What is FATCA reporting? on page 2 for further information. Cat. No. 10231X Form W-9 (Rev. 12-2014) 2/15/19 Premiere Design Solutions, Inc ✔ 12781 Miramar Pkwy, Suite 205 Miramar, FL 33027 26 0571068 Page 358 of 358232 08/07/2020 Carolinas Insurance and Investment 323 Oakland Ave. Rock Hill SC 29730 Amanda Woodson (803) 328-9988 (803) 328-9914 amanda@cignetwork.com Premiere Design Solutions, Inc 12781 Miramar Pkwy, Ste 205 Miramar FL 33027 Sentinel Insurance Company 11000 Hartford Accident an Indemnity Co 22357 Hartford Casualty Insurance Comany 29424 Lloyd's of London - Hiscox 10200 CL2051803815 A 22SBMAE3513 03/01/2020 03/01/2021 1,000,000 1,000,000 10,000 1,000,000 2,000,000 2,000,000 FL Fire College Srchg B CMP ded 1k COL ded 1k 22UECNL6634 04/23/2020 04/23/2021 1,000,000 Medical payments 5,000 A 10,000 22SBMAE3513 03/01/2020 03/01/2021 4,000,000 4,000,000 C Y 22WECEK0640 06/02/2020 06/02/2021 1,000,000 1,000,000 1,000,000 D Professional Liability Retroactive Date: 4/29/2011 ANE1735112.20 04/29/2020 04/29/2021 Each Claim $2,000,000 Agggregate $2,000,000 Retention $10,000 City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach FL 33160 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. INSURER(S) AFFORDING COVERAGE INSURER F : INSURER E : INSURER D : INSURER C : INSURER B : INSURER A : NAIC # NAME:CONTACT (A/C, No):FAX E-MAILADDRESS: PRODUCER (A/C, No, Ext):PHONE INSURED REVISION NUMBER:CERTIFICATE NUMBER:COVERAGES IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. OTHER: (Per accident) (Ea accident) $ $ N / A SUBR WVD ADDL INSD THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. $ $ $ $PROPERTY DAMAGE BODILY INJURY (Per accident) BODILY INJURY (Per person) COMBINED SINGLE LIMIT AUTOS ONLY AUTOSAUTOS ONLY NON-OWNED SCHEDULEDOWNED ANY AUTO AUTOMOBILE LIABILITY Y / N WORKERS COMPENSATION AND EMPLOYERS' LIABILITY OFFICER/MEMBER EXCLUDED?(Mandatory in NH) DESCRIPTION OF OPERATIONS belowIf yes, describe under ANY PROPRIETOR/PARTNER/EXECUTIVE $ $ $ E.L. DISEASE - POLICY LIMIT E.L. DISEASE - EA EMPLOYEE E.L. EACH ACCIDENT EROTH-STATUTEPER LIMITS(MM/DD/YYYY)POLICY EXP(MM/DD/YYYY)POLICY EFFPOLICY NUMBERTYPE OF INSURANCELTRINSR DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) Request for qualifications: 20-07-01 Evidence of coverage for the named insured listed on this certificate. General liability, automobile liability and umbrella have coverage for additional insureds, are primary & non-contributory. All policies have blanket waiver of subrogation and 30 day notice of cancellaiton (if cancelled for non payment of premium, only 10 day notice of cancellation.) EXCESS LIAB UMBRELLA LIAB $EACH OCCURRENCE $AGGREGATE $ OCCUR CLAIMS-MADE DED RETENTION $ $PRODUCTS - COMP/OP AGG $GENERAL AGGREGATE $PERSONAL & ADV INJURY $MED EXP (Any one person) $EACH OCCURRENCE DAMAGE TO RENTED $PREMISES (Ea occurrence) COMMERCIAL GENERAL LIABILITY CLAIMS-MADE OCCUR GEN'L AGGREGATE LIMIT APPLIES PER: POLICY PRO-JECT LOC CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY) CANCELLATION AUTHORIZED REPRESENTATIVE ACORD 25 (2016/03) © 1988-2015 ACORD CORPORATION. All rights reserved. CERTIFICATE HOLDER The ACORD name and logo are registered marks of ACORD HIREDAUTOS ONLY PROFESSIONAL LIABILITY INSURANCE POLICY CLARIFICATION: 'Potential claim' means any acts, errors, or omissions of an insured or other circumstances reasonably likely to lead to a claim covered under this policy.” 233 City of Sunny Isles Beach |Request for Qualifications No. 20-07-01 33 DELIVER TO: City of Sunny Isles Beach City Clerk 18070 Collins Avenue Sunny Isles Beach, FL 33160 REQUEST FOR QUALIFICATIONS SECTION 6 RESPONDENT SUBMITTAL FORMS OPENING: 2:30 P.M. Tuesday, August 11, 2020 NOTE: City of Sunny Isles Beach is exempt from all taxes (Federal, State, and Local). Tax Exemption Certificate furnished upon request. Issued by: Purchasing Agent Genesis Cuevas Date Issued: Wednesday, July 8, 2020 This Qualification Submittal Consists of all required forms, including SF330, Questionnaires, Acknowledgements and Affidavits Submissions are subject to the Terms and Conditions of this Request for Qualifications and the accompanying Submittal. Such other contract provisions, specifications, drawings or other data as are attached or incorporated by reference in the Submittal, will be received at the office of the City Clerk at the address shown above until the above stated time and date, and at that time, publicly opened for furnishing services described in the accompanying Submittal Requirement. RFQ No. 20-07-01 Continuing Contract for Professional Services CCNA Firm Name ________________________________________ Commodity Code(s): RETURN ONE ORIGINAL AND FOUR COPIES OF QUALIFICATION SUBMITTAL PAGES AND AFFIDAVITS FAILURE TO SIGN PAGE 38 OF SECTION 6 QUALIFICATION SUBMITTAL WILL RENDER YOUR SUBMISSION NON-RESPONSIVE 234 PREMIERE DESIGN SOLUTIONS, INC. [018-925-17], [018-925-86], [018-962-52], [032-911-40] City of Sunny Isles Beach |Request for Qualifications No. 20-07-01 34 6.1 ACKNOWLEDGEMENT FORM NAME OF COMPANY: ___________________________________________ (Name of company submitting RFQ) CHECK CATEGORY (CATEGORIES) YOU ARE APPLYING FOR: 1-ARCHITECTS __ 2-CIVIL ENGINEERS__ 3-ELECTRICAL ENGINEERS___ 4-SURVEYORS AND MAPPING__ 5-LEAK DETECTION STUDIES__ 6-MECHANICAL, HVAC & PLUMBING ENGINEERS___ 7 - GEOTECHNICAL___ 8 – STRUCUTRAL ENGINEERS___ 9 – ENVIRONMENTAL ENGINEERS____ 10. CONSTRUCTION ENGINEERING AND INSPECTION (CEI) SERVICES____ 235 PREMIERE DESIGN SOLUTIONS, INC. X X City of Sunny Isles Beach |Request for Qualifications No. 20-07-01 35 REQUIRED FORMS PRIME FIRM Role Name of Individual Assigned to Project Number of Years’ Experience Education, Degree Principle-in-Charge: Project Manager Asst. Project Manager Other Key Member Other Key Member REFERENCES Name Firm Providing Reference Phone # Email Address 236 Luis J. Jurado Gustavo A. Eckardt Jorge Michel Olmo Fernando Fernandez Jason McKoy 17 18 20 25 12 Professional Engineer, B.S. Civil Engineering Registered Architect, Masters in Architectural B.A. Architecture Professional Land Surveyor & Mapper, B.S. Hydrology Engineering Professional Engineer, B.S. Civil Engineering Ms. Arethia Douglas, P.E.Broward County Transportation Department 954.357.8487 acdouglas@broward.org Mr. Javier Salmon Miami-Dade Transit Department 786.469.5267 jsalmon@miamidade.gov Mr. Carlos Gonzalez City of Opa-Locka 305.206.0279 cgonzalez@Opalockafl.gov Mr. Alex Retamar Miami-Dade Water and Sewer Department 786.552.4405 alex.retamar@miamidade.gov Ms. Helen Gray, PE City of Miami Gardens 954.270.9247 hgray@miamigardens-fl.gov City of Sunny Isles Beach |Request for Qualifications No. 20-07-01 36 ACKNOWLEDGEMENT OF ADDENDA INSTRUCTIONS: COMPLETE PART I OR PART II, WHICHEVER APPLIES PART I: LIST BELOW ARE THE DATES OF ISSUE FOR EACH ADDENDUM RECEIVED IN CONNECTION WITH THIS RFQ Addendum #1, Dated Addendum #2, Dated Addendum #3, Dated Addendum #4, Dated Addendum #5, Dated Addendum #6, Dated Addendum #7, Dated Addendum #8, Dated PART II: NO ADDENDUM WAS RECEIVED IN CONNECTION WITH THIS RFQ FIRM NAME: AUTHORIZED SIGNATURE: DATE: TITLE OF OFFICER: 237 PREMIERE DESIGN SOLUTIONS, INC. President 08/18/2020 07/17/2020 07/28/2020 08/03/2020 08/07/2020 None None None None City of Sunny Isles Beach |Request for Qualifications No. 20-07-01 37 RESPONDENT SUBMITTAL FORM RFQ 20-07-01 Continuing Professional Consulting Services (CCNA) The undersigned Firm proposes and agrees, if this submission is accepted, to enter into an agreement with the City of Sunny Isles Beach to perform and furnish all Services as specified or indicated in the Contract Documents. The Firm accepts all of the terms and conditions of this Request for Qualifications. This Bid will remain subject to acceptance for 90 days after the day of Bid opening. The Firms agrees to sign and submit the Agreement and other documents as required by the Bidding Requirements within ten days after the date of the City’s Notice of Award. In submitting this response, the Firm represents, as more fully set forth in the Agreement, that: The Firm has familiarized himself/herself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Law and Regulations that in any manner may affect cost, progress, performance, or furnishing of the Work. The Firm has studied carefully all reports and drawings of subsurface conditions and drawings of physical conditions. The Firm has given the City written notice of all conflicts, errors, discrepancies that it has discovered in the Contract Documents and the written resolution thereof by City is acceptable to the Firm. This solicitation is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation; the Firm has not directly or indirectly induced or solicited any other Firms to submit a false or sham Bid; the Firm has not solicited or induced any person, firm or corporation to refrain from Bidding; and Firm has not sought by collusion to obtain for itself any advantage over any other Firms or over the City. The City and the successful Firm will establish completion times for the services described in this Request for Qualifications and the successful Firm agrees that the services will be completed within the time frames agreed upon and stipulated in the individual Notice to Proceed. 238 City of Sunny Isles Beach |Request for Qualifications No. 20-07-01 38 Firm Name: _____________________________________________________________________________ Street Address: _____________________________________________________________________________ Mailing Address (if different): _____________________________________________________________________________ Telephone No. _______________________________Fax No. _________________________ Email Address: _______________________________FEIN No. __/__-__/__/__/__/__/__/__ *“By signing this document the Responder agrees to all Terms Signature: __________________________________________________________________ (Signature of authorized agent) Print Name: _________________________ Title: _________________________________________ THE EXECUTION OF THIS FORM CONSTITUTES THE UNEQUIVOCAL OFFER OF FIRM TO BE BOUND BY THE TERMS OF ITS SUBMISSION. FAILURE TO SIGN THIS SOLICITATION WHERE INDICATED ABOVE BY AN AUTHORIZED REPRESENTATIVE SHALL RENDER THE SUBMISSION NON-RESPONSIVE. THE CITY MAY, HOWEVER, IN ITS SOLE DISCRETION, ACCEPT ANY SUBMISSION THAT INCLUDES AN EXECUTED DOCUMENT, WHICH UNEQUIVOCALLY BINDS THE FIRM TO THE TERMS OF ITS OFFER. 239 PREMIERE DESIGN SOLUTIONS, INC. Luis J. Jurado President 1065 NE 125th St, #211B, North Miami, FL 33161 954-237-7850 954-337-2332 Ljurado@pds-eng.com 2 6 0 5 7 1 0 6 8 EQUAL OPPORTUNITY / AFFIRMATIVE ACTION City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 EQUAL OPPORTUNITY/AFFIRMATIVE ACTION STATEMENT The contractors and all subcontractors hereby agree to a commitment to the principles and practices of equal opportunity in employment and to comply with the letter and spirit of federal, state, and local laws and regulations prohibiting discrimination based on race, color, religion, national region, sex, age, handicap, marital status, and political affiliation or belief. Signed: ________________________________________ Title: ________________________________________ Firm: ________________________________________ Address: ________________________________________ ________________________________________ DECEMBER 28, 2010 240 PREMIERE DESIGN SOLUTIONS, INC. President 1065 NE 125th St, #211B, North Miami, FL 33161 DISPUTE DISCLOSURE City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 DISPUTE DISCLOSURE FORM Answer the following questions by placing a “X” after “Yes” or “No”. If you answer “Yes”, please explain in the space provided, or on a separate sheet attached to this form. 19.1. Has your firm or any of its officers, received a reprimand of any nature or been suspended by the Department of Professional Regulations or any other regulatory agency or professional associations within the last five (5) years? YES __________ NO __________ 19.2. Has your firm, or any member of your firm, been declared in default, terminated or removed from a contract or job related to the services your firm provides in the regular course of business within the last five (5) years? YES __________ NO __________ 19.3. Has your firm had against it or filed any requests for equitable adjustment, contract claims, Bid protests, or litigation in the past five (5) years that is related to the services your firm provides in the regular course of business? YES __________ NO __________ If yes, state the nature of the request for equitable adjustment, contract claim, litigation, or protest, and state a brief description of the case, the outcome or status of the suit and the monetary amounts of extended contract time involved. I hereby certify that all statements made are true and agree and understand that any misstatement or misrepresentation of falsification of facts shall be cause for forfeiture of rights for further consideration of this Bid for the City of Sunny Isles Beach. ________________________________________ ______________________________________ Firm Date ________________________________________ _______________________________________ Authorized Signature Print or Type Name and Title DECEMBER 28, 2010 PREMIERE DESIGN SOLUTIONS, INC. Luis J. Jurado, President 08/18/2020 X X X CONTRACTOR ANTI-BOYCOTT CERTIFICATION [PURSUANT TO FLORIDA STATUTE § 215.4725] I, ___________________, on behalf of _________________________, Print Name Company Name certifies that___________________________ does not: Company Name 1.Participate in a boycott of Israel; and 2.Is not on the Scrutinized Companies that Boycott Israel list; and 3.Is not on the Scrutinized Companies with Activities in Sudan List; and 4.Is not on the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List; and 5.Has not engaged in business operations in Cuba or Syria. ________________________________ Signature ________________________________ Title ________________________________ Date PREMIERE DESIGN SOLUTIONS, INC. PREMIERE DESIGN SOLUTIONS, INC. Luis J. Jurado President 08/18/2020 City of Sunny Isles Beach Sunny Isles Beach, Florida Continuing Professional Consulting Services (CCNA) Qualifications for Consulting Engineering Services Solicitation No. 20-07-01 August 18, 2020 L) ORIGINAL Reaelv�a,� A(/G 82020 c CityofSunn �l`Ice of the Clty Clerk n Project Manager: William B. Sellon, Associate Principal Regional Director Miami Office Firm: R.G. Vanderweil Engineers, LLP 8350 NW 52n° Terrace, Suite 300 1 Miami, FL 33166 1305.501.5740 VAN®ERWEIL9 _J Section B. Table of Contents Section A Section B Section C Section D Section E Section F Section G Section H Section I 2 Title Page hJ F. Title Page Page 1 Table of Contents Page 2 Cover letter and Executive Summary ® I O ®) Page 4 Project Approach and Understanding ' Page 7 ®I ISI M UM Qualification Information and Assigned Personnel Page 9 Ow Firm References and Similar Work Completed Page 19 I Corporate Standing and Authorized Signatory Page 29 Forms and Attachments Page 33 SF330 Forms Page 50 , VANDERWEIL VANDEti' WEIL R.G. Vanderweil Engineers, LLP 8350 NW 52nd Terrace 305.501.5734 TEL vanderweiLcom Miarni, FL 33166 August 18, 2020 Attn: City Clerk Sunny Isles Beach Government Center 18070 Collins Avenue Sunny Isles Beach, Florida 33160 Re: Continuing Professional Consulting Services (CCNA) Proposal for Consulting Engineering Services To whom it may concern: We are pleased to have this opportunity to submit our qualifications for consulting engineering services for the City of Sunny Isles Beach located in Florida. Vanderweil will be submitting for the services labeled below and noted in the completed 6.1 Acknowledgment Form enclosed in the attachments. • 3- Electrical Engineers • 6- Mechanical, HVAC, & Plumbing Engineers Enclosed within this package you will find the requested materials including similar projects, resumes, references, state business licenses, staff certifications, and specified forms in the attachments section. If selected, Vanderweil is willing to meet any location, budget, and/or task orders. Current Workload The key team members proposed for the City of Sunny Isles Beach, Continuing Professional Consulting Services are fully available for this assignment. We will ensure that these individuals will be available to attend all the necessary meetings, working sessions, and will produce all of the deliverables associated with each project. As we do on every one of our projects, our approach is to have the design team that we selected involved from the beginning through the completion of construction. R.G. Vanderweil Engineers, LLP (Vanderweil) has selected these proposed team members because they have provided excellent service on recent similar projects. Vanderweil is local to Florida with our office in Miami. Our local resources are available to respond quickly to any issues and needs in person. Vanderweil currently has over 450 staff with offices in Miami, Boston, Atlanta, Washington, DC, New York, Phoenix, Philadelphia, Princeton, and Long Beach. Our organizational structure enables us to reach out to any of our offices should the need arise for additional staffing resources and expertise. The size and organization of our firm provides the flexibility to manage small to large scale projects in a timely and cost-efficient manner. Our technical and design approaches coupled with project delivery have been extremely successful, and have yielded client satisfaction with a repeat business ratio of 90%. We consider this to be verification that we are providing a quality product with quality services. Due to the firm's resources and staff, we currently maintain a manageable workload and do not foresee any impact to proposed projects with the City of Sunny Isles Beach. 4 VAN®ERWEIL� Attn: City Clerk Sunny Isles Beach Government Center Proposal for Consulting Engineering Services Project Understanding Vanderweil understands that the City of Sunny Isles Beach, Florida seeks to secure qualified and experienced professional consulting firms to submit statements of qualifications to provide services as required under a non-exclusive continuing services contract. Vanderweil understands professional services, if awarded through this RFQ, will be for projects that do not exceed $4,000,000 in basic construction cost and for study activity if the fee for professional services for each individual study does not exceed $500,000. It is understood that the city will periodically issue specific projects and assignments to the retained consultants on an as -needed basis. Minority Business Commitment Vanderweil, although not a certified MBE, has a long history of subcontracting work to woman -owned and minority-owned business enterprises and remain fully committed to meeting the subcontracting goals of the City of Sunny Isles, Florida. The firm maintains a roster of highly qualified specialty sub consultant firms with whom we regularly team on appropriate projects. Vanderweil understands the importance of hiring disadvantaged small business and women -owned businesses and remains committed to meeting any goals for MJW/DBE and affirmative action efforts subcontracting on this contract. Thank you for the opportunity to present you with our qualifications. We are looking forward to a successful project with your team. Very truly yours, R.G. Va nderweil Engineers, LLP William B. Sellon, CPD, LEED AP Associate Principal 8350 NW 52nd Terrace, Suite 300 Miami, FL 33166 p: (305) 501-5734 e: wsellon@vanderweil.com William B. Sellon is authorized to make representations for the Firm. Page 2 of 2 1 VANDERWEIL Project Approach and Understanding Section D Scope of Services Vanderweil is pleased to submit for the below services for the City of Sunny Isles, Continuing Professional Consulting Services contract. These services are also noted in the completed 6.1 Acknowledgment Form enclosed in the attachments. • 3- Electrical Engineers • 6- Mechanical, HVAC, & Plumbing Engineers Vanderweil will provide mechanical, electrical and plumbing engineering design services to support the project scope. Project Undrestanding Vanderweil understands that the City of Sunny Isles Beach, Florida seeks to secure qualified and experienced professional consulting firms to submit statements of qualifications to provide services as required under a non-exclusive continuing services contract. It is understood that the city will periodically issue specific projects and assignments to the retained consultants on an as -needed basis. Project and Management Approach Vanderweil has in-depth communication processes for checks and balances to ensure that there is constant communication to engage the City of Sunny Isles Beach through weekly project updates and to ensure standards and Owner project requirements (OPR) are fully integrated into the contract documents. Vanderweil utilizes MS Teams for project video conference calls along with Newforma for file management for tracking open issues, coordination of items, site visit reports, QC reviews, owner comments, RFIs, submittals, and project schedule. Our team works with MEP systems manufacturers on all projects to ensure that the most cost-effective systems and approaches are taken while taking into consideration maintenance requirements and energy usage for each system. Vanderweil also has a tried and true QA/QC process during all phases of the project which includes senior engineers in each discipline that review the project and ensure all design options are fully evaluated for each MEP system. This helps to determine the best design approach to the project while keeping cost, space, and maintenance in mind. This process has proven to help keep project costs in line with the owner's budget. Project Cost and Schedule Vanderweil controls our professional engineering / consulting services (cost management) through a disciplined project management approach of: • Identify the project scope • Develop the man-hour (effort) to support the scope • Monitor progress and provide feedback on changes in scope and/or schedule that may affect our performance commitments We monitor and have the capabilities to report on our progress and financial expenditures (labor and expenses) through our accounting platform, BST. We are also utilizing Newforma on more projects for document control, project team tracking, task lists/assignments, as well a schedule tracking of key milestones and deliverables. 7 VAN D E RW E I LI Company Overview About Us Vanderweil Engineers is a mechanical, electrical, plumbing, technology services, sustainability, and power engineering firm dedicated to providing value-added services. As seen in the listing below, our 450 -person staff has expertise in many areas. We are committed to developing customized and innovative solutions. Founded in 1950, Vanderweil is a company that values its clients, its employees and the environment - and we have built our practice accordingly. To enable us to provide personalized services, we have organized the firm around a series of specialty groups, each focused on a particular area of expertise. This allows us to create an experienced and responsive engineering team for each project. We try to involve young engineers in our projects, working closely with our senior engineers - a combination that provides energy, enthusiasm, and experience. Our portfolio includes projects of all types and sizes. Over the years, Vanderweil has designed MEP systems for buildings of all types, cogeneration plants up to 50 MW, chilled water plants to 100,000 tons, hundreds of miles of transmission lines up to 345 kV, and utility grade substations up to 1000 MVA. Our buildings have incorporated many sustainability provisions, and over 175 have obtained LEED® certification. The firm is a LEED® Proven ProviderT" and active participant in the AIA 2030 Commitment. We use Revit MEP/Navisworks as our BIM platform, and a variety of software for project management, energy modeling, computational fluid dynamics, pipe stress analysis, transmission tower foundation design, and other analytical work. Services Building Services Engineering HVAC Plumbing Fire Protection Electrical Energy Management Commissioning Whole Building Cx Retro-Cx Activities Comprehensive System Integration Operating Procedures Cx Design Review Sustainable Building Design Energy, Solar & CFD Analysis BIM Integration LEED Administration Green Building Certification Post Occupancy Evaluation Technology Services System Consulting & Needs Assessment Structured Cabling Systems Security Systems Access Control Audiovisual Systems Central Plants Steam & HT HW Plants Chiller Plants Cogeneration District Energy Plants Transmission & Distribution Engineering Transmission Line Engineering & Design to 765 kV Distribution and Sub -transmission Line Engineering & Design 4 kV' to 69 kV Substation Engineering & Design to 345 kV AIS & GIS Atlanta Boston Los Angeles Miami New York Phoenix Philadelphia Princeton Washington, DC 9 VANDERWEILI Qualification Information and Assigned Personnel Section E The Value of a Local Firm Vanderweil, founded in 1950, has worked in the state of Florida for the past 28 years. During this time Vanderweil has completed over 100 projects within the region, and maintains a local Miami -Dade County office. Bill Sellon, Associate Principal, not only heads the Miami office but also grew the business from the ground up. Bill originally started as a senior plumbing engineer and project manager, working out of Vanderweil's New York office. When the opportunity to expand arose, Bill took on the challenge of establishing the new regional office. Over the years, Bill has cultivated existing reslationships and established new ones, growing the office to $2M in revenues today. Vanderweil has nine offices throughout the United States. Should the need arise for additional staffing, we have the opportunity to reach out to our offices in Atlanta, Boston, Los Angeles, New York, Phoenix, Princeton, Philadelphia, and Washington, D.C. The size and organization of our firm provides the flexibility to manage and satff large projects in a timely and cost-efficient manner, while also providing hands-on, localized services to better satisfy our clients. Proposed Team As requested, we have included full resumes in Section F: Firm References and Similar Work Completed. The team members proposed for this contract all have a wealth of mechanical, HVAC, electrical, and plumbing experience as well as local experience on both federal and municipal projects. As stated in the Executive Summary, the proposed team members are currently available to work on any and all projects for the City of Sunny Isles Beach. Past Project Experience Also enclosed in Section F: Firm References and Similar Work Completed are three relevant projects to the City of Sunny Isles in terms of scope, size, and client type. A representative list of Vanderweil's government projects as well as past experience in the state of Florida are also included in this section. Vanderweil's specific similar project experience, as it relates to the City of Sunny Isles, includes engineering design services for the renovation of the Station Marathon for the U.S. Department of Homeland Security, United States Coast Guard. This government project on the United States Coast Guard campus in Marathon, FL, included several buildings: a two-story administration building, single -story office and storage building, and a boathouse which is a single -story building that houses a repair shop, and storage. The scope of design includes interior renovation, infrastructure enhancements, fuel farm replacement, exterior lighting replacement and complementary plumbing, as well as mechanical and electrical power work for all buildings on the campus. Financial Stability and Certifications Also enclosed in this section, please find Vanderweil's statement of Financial Stability as well as the requested business licenses and individual certifications of the proposed team. 10 1 VANDERWEIL, VANDERWEIL, Qualification Information and Assigned Personnel Financial Stability R.G. Vanderweil Engineers, LLP 274 Summer Street 617.423.7423 TEL vanderweil.com Boston, MA 02210 617.423.7401 FAX R.G. Vanderweil Engineers, LLP / R.G. Vanderweil Engineers, PC Statement of Financial Stability As a privately held partnership with a net worth of over $16 million dollars, we can perform this project without requiring new financing. Vanderweil has a $3 million dollar line of credit, which is more than sufficient to finance any operational needs, and is currently not drawn upon. Vanderweil's annual gross revenues over the past three (3) years were as follows: 2019 $ 122,506,000 2018 $ 117,419,000 2017 $ 89,419,000 R.G. Vanderweil Engineers, LLP has steadily grown to a current staff of 460 since its inception 70 years ago and has a current total backlog of over $77 million dollars. The size and organization of our firm provides the flexibility to manage projects in a timely and cost efficient manner and we have manpower in place to properly staff this project. Should you need more information please contact Kevin Burke, our banking contact with Cambridge Savings Bank at (617) 234-7272 or the undersigned. Should Vanderweil be awarded this project or enter into final negotiations, Vanderweil Engineers would be more than happy to provide any additional financial information that may be required. Very truly yours, R.G. Vanderweil Engineers, LLP Keith Lord Managing Principal/Chief Financial Officer Is r VAN D E RW E I L� Qualification Information and Assigned Personnel Upr F &D tuft slorial Regulation Engineer #63947 License Menu Select the function you wish to perform. Press "Back" to return to the main menu. Individual Staff Certifications 0-11- DBPR ONLINE SERVICES Main Menu I Update Profile I Logoff 1 contact us Logged in as De La Novel, Felix E 12 License Issued To: License Status: Originally Licensed On: Expires On: Modifiers: DE LA NOVAL, FELIX E Current, Active 02/06/2006 (mm/dd/yyyy) 02/28/2021 (mm/dd/yyyy) Electrical & Computer 08/02/2005 (mm/dd/yyyy) Advanced Building Code Course Credit 09/25/2018 (mm/dd/yyyy) M O j:70 Z 4-, (UL- :5 u W v V) L -E L c° LLI W a CJ a) N W N m J Z I— J :3 Q LLI > > r o = Z LLIQ a_�_ NE ami O i `.i -M N j E Vi �f ►11� a� c' O a N _ fig+ g1, � 4 a W LLI m{ 9 P j �� i 1 Y WC J W LLY �A + y f or LL -4,d ij r cuFF ILL c LLI Q W '.,`i P a eve �� C 4-J O ILLJ tI"01, O 4-- 19 .TF U. a _ . O W �,.ry. r� W 3 L I— O z> a N 0 > W m Z a v 0 G W � W cc DC Q v d w � Q H Ui (ill ❑ �❑ VANDERWEIL, Cleveland Clinic Florida, Nuclear Medicine Suite West Palm Beach, FL University of South Florida, Morsani College of Medical Heart Health Institute, Tampa, FL West Palm Beach Mixed -Use Development West Palm Beach, FL State of Florida Past Project Experience • Amazon.com, Inc., Jacksonville Fulfillment Center, Jacksonville, FL • Boston Scientific Corporation, East Building Electric Study, Miami, FL • Boston Scientific Corporation, Master Plan, Miami, FL • Cisco Systems, Miami, FL • Cisco Systems, Jacksonville, FL • Cleveland Clinic Florida, Nuclear Medicine Suite, West Palm Beach, FL • Confidential Project, Miami, FL • Confidential Owner, Luxury High -Rise Apartment Complex, Miami Beach, FL • CVS Caremark, ACS Orlando, Standard of Care, Orlando, FL • CVS Caremark, Standard of Care, Orlando, FL • Eckerd College, Marine Science Center, St. Petersburg, FL • Florida Advanced Manufacturing Research Center, Osceola County, FL • Florida International University, Parkview II Housing Project, Miami, FL • Florida State University, College of Business, Legacy Hall, Tallahassee, FL • Grove, Retail and Residential Development, Miami, FL • Hilton Garden Inn, Miramar, FL • Indian River State College, Building N, Science Building and Chiller Plant Engineering Due Diligence, Fort Pierce, FL • Indian River State College, Building Q, Engineering Upgrades, Fort Pierce, FL • Indian River State College, Workforce Training Center, Fort Pierce, FL • Indian River State College, Building "O" Chiller Plant Upgrades, Fort Pierce, FL • Kaufman Rossin, Headquarters Interior Renovation at Coconut Grove, Miami, FL • Macy's Inc., Miami Beach Due Dilligence, Miami Beach, FL • Marriott Corporation, West Palm Beach, FL • Morton Plant Health System, Clearwater, FL • Morton Plant Hospital, Hospital Expansion, Clearwater, FL • Norton Museum of Art, West Palm Beach, FL • St. Lucie County Florida, Solid Waste to Energy Conversion Facility, Fort Pierce, FL • University of Central Florida, Health and Public Affairs II Building, Facility Assessment, Orlando, FL • University of Florida, Herbert Wertheim Laboratory for Engineering Excellence, Gainesville, FL • University of Miami, Medical Campus Master Plan, Miami, FL • University of South Florida, Morsani College of Medical Heart Health Institute, Tampa, FL • U.S. Department of Homeland Security, United States Coast Guard, H Irma Station, Marathon, FL • Washington Square, Tallahassee Hotel & Mixed -Use Center, Technology Design, Tallahassee, FL • Walt Disney Swan Hotel, Renovation, Orlando, FL • West Palm Beach Mixed -Use Development, West Palm Beach, FL 14 VANDERWEIL, Department of Transportation, Headquarters _ Washington, DC Federal Bureau of Investigation Quantico, VA Internal Revenue Service Martinsburg, WV Government Projects Past Project Experience • U.S. Department of Homeland Security, United States Coast Guard, H Irma Station, Marathon, FL • Andrews Air Force Base, Squadron Operations Center, Landover, MD • Architect of the Capitol (AOC), Indefinite Delivery/Indefinite Quantity Design - Build Contract, U.S. Senate, Perimeter Security Elements, Washington, DC • Architect of the Capitol (AOC), Indefinite Delivery/Indefinite Quantity Design - Build Contract, Ford House Office Building, Washington, DC • Bolling Air Force Base, Multiple Projects, Washington, DC • Bureau of Alcohol, Tobacco & Firearms, National Laboratory Center, Beltsville, MD • Butner Federal Correction Complex, Butner, NC • Centers for Disease Control and Prevention (CDC), Atlanta, GA • Confidential Owner, Martin Building Renovation, Washington, DC • Confidential Owner, Explosive Testing Laboratory, Redstone Arsenal, AL • Confidential Owner, National Transportation System Center Headquarters, Cambridge, MA • Confidential Project, Anne Arundel County, MD • Confidential Project, San Antonio, TX • Department of Homeland Security Headquarters Consolidation & Relocation Project, Center Building, St. Elizabeths West Campus, Washington, DC • Department of Justice, Confidential Forensic Laboratory, Huntsville, AL • Department of Justice, Hazardous Device School, Huntsville, AL • Department of Transportation (DOT), Headquarters, Washington, DC • E. Barrett Prettyman Federal Courthouse, Washington, DC • Environmental Protection Agency, Research and Administration Facility, Research Triangle Park, NC • Essex County Sheriff's Department, Security Infrastructure and Surveillance Equipment, Middleton, MA • Federal Bureau of Prisons, HOLC Building Sixth Floor Renovation, Washington, DC • Federal Emergency Management Agency (FEMA), Emergency Preparedness & Response Group (EPRG), Winchester, VA • Federal Office Building 10B, Washington, DC • Federal Bureau of Investigation, Forensic Laboratory, Quantico, VA • Federal Reserve Bank, Boston, MA • First Brigade Wheeler -Sack Army Airfield Barracks Complex, Fort Drum, NY • Fort Belvoir Community Hospital, Fort Belvoir, VA • General Services Administration, Fifth Floor Renovation, Washington, DC • General Services Administration, Presidential Transition Team, Washington, DC • H. Carl Moultrie I Courthouse, Washington, DC • Internal Revenue Service, National Computing Center, Martinsburg, WV • John Wilson Building, Washington, DC 15 VAN D E RW E I Lq Government Projects National Oceanographic and Atmospheric Administration (NOAA), National Center for Weather and Climate Prediction, Prince George's County, MD U.S. Department of Agriculture, Consolidated Laboratory Facility, Ames, IA U.S. Department of Agriculture, Phase 1 APHIS Laboratory, Ames, IA Past Project Experience • Mary E. Switzer Building, Bridging Documents, Washington, DC • Mary E. Switzer Building Modernization, Washington, DC • McGuire Air Force Base, Visiting Quarters, NJ • Montgomery County Multi -Agency Services Park, Rockville, MD • National Archives and Records Administration (NARA), George HW Bush Presidential Library and Museum, College Station, TX • National Archives and Records Administration (NARA), National Personnel Records Center, St. Louis, MO • National Audio -Visual Conservation Center, Culpeper, VA • National Cancer Institute (NCI), Lab 12, Fort Detrick, MD • National Cancer Institute (NCI), Vaccine Development Facility, Fort Detrick, MD • The National Guard Bureau, U.S. Army Garrison at West Point, Scott Barracks RFPs and Modernization Plan, Task Order for National A-E IDIQ, West Point, NY • National Institutes of Health, Master Utility Plan, Bethesda, MD • National Institute of Health, Office of Research Facilities, Indefinite -Delivery Indefinite -Quantity, Bethesda, MD • National Museum of American History, Behring Center Modernization, Washington, DC • National Museum of American History, Flag Hall Conservation Laboratory, Washington, DC • National Museum of the United States Army, Fort Belvoir, VA • National Oceanographic and Atmospheric Administration (NOAA), National Center for Weather and Climate Prediction, Prince George's County, MD • National Park Service, Indefinite Delivery Contract, Nationwide • Naval Submarine Base, Groton, CT • Reeves Center and One Judiciary Square, Energy Efficiency Upgrades, Washington, DC • State of Connecticut, Public Health Laboratory, Rocky Hill, CT • Smithsonian Institution, Astrophysical Observatory, Cambridge, MA • Smithsonian Institution, Castle and Arts & Industries Buildings, Washington, DC • Smithsonian Institution Warehouse, Landover, MD • Transportation Security Administration (TSA), Transportation Systems Integration Facility (TSIF), Arlington, VA • U.S. Army Corps of Engineers, Womack Army Medical Campus, Fort Bragg, Behavioral Health Clinic, Fort Bragg, NC • U.S. Army Criminal Investigation Laboratory, Fort Gillem, GA • U.S. Army Garrison at West Point, Restoration and Modernization of MacArthur Short Barracks, West Point, NY • U.S. Army Training & Doctrine Command (TRADOC) Headquarters, Ft. Eustis, VA • U.S. Coast Guard, Maintenance and Engineering Facility, Boston, MA VANDERWEILI U.S. General Service Administration, Environmental Protection Agency, One Potomac Yard, Arlington, VA U.S. General Service Administration, Environmental Protection Agency, One Potomac Yard, Arlington, VA U.S. General Service Administration, Environmental Protection Agency, One Potomac Yard, Arlington, VA Government Projects Past Project Experience • U.S. Department of Agriculture, Consolidated Laboratory Facility, Ames, IA • U.S. Department of Agriculture, Phase 1 APHIS Laboratory, Ames, IA • U.S. Department of Housing and Urban Development, Pilot Project, Washington, DC • U.S. Department of Justice, Federal Bureau of Investigation, First Floor Renovations, Washington, DC • U.S. Department of the Treasury, Bureau of Engraving and Printing, Feasibility Study, Main & Annex Buildings, Washington, DC • U.S. Department of Veterans Affairs, Integrated Planning for VISN1, New England Region • U.S. Department of Veterans Affairs, Health Care Center, Winston-Salem, NC • U.S. Department of Veterans Affairs, VA Medical Center, Brockton, MA • U.S. Department of Veterans Affairs, VA Medical Center, Jamaica Plain, MA • U.S. Department of Veterans Affairs, VA Medical Center, Cogen, West Roxbury, MA • U.S. Department of Veterans Affairs, VA Medical Center, West Haven, CT • U.S. Diplomacy Center, Washington, DC • U.S. Federal Courthouse, Harrisburg, PA • U.S. General Service Administration, U.S. Department of Transportation Volpe Exchange, Cambridge, MA • U.S. General Service Administration, Design -Build for Building 54/West Addition, Washington, DC • U.S. General Service Administration, Environmental Protection Agency, One Potomac Yard, Arlington, VA • U.S. General Services Administration, National Institute of Building Sciences, IDIQ Contract, Post Occupancy Evaluation Program Reports, Various Locations • U.S. Marine Corps Association, Headquarters Addition, Quantico, VA • U.S. Marine Corps Heritage Foundation, Semper Fidelis Memorial Park Chapel, Quantico, VA • U.S. Postal Service, Astor Carrier Annex, Boston, MA • U.S. Postal Service, General Mail Facility, Westchester, NY • U.S. Postal Service, General Mail & Vehicle Maintenance Facility, Harrison, NY • U.S. Postal Service, General Mail & Vehicle Maintenance Facility, Springfield, MA • Veteran's Administration Hospital, Study and Master Plan, Northeastern Region • Wright Patterson Air Force Base, Flight Simulator and Data Center Dayton, OH IN VANDERWEILI Firm References and Similar Work Completed - . .......... - - --- - - -- Section F Enclosed within this section please find three relevant projects, three rererences of work within the last five years, and proposed team resumes. All of the projects on the resumes included herein are projects worked on within the last 10 years. Additionally, Vanderweil has 70 years experience in the engineering industry, working with a variety of clients including public and municipal/federal, as well as working in similar climates such as coastal and island environments. These regions have unique engineering challenges. Resiliency of our designed MEP/FP systems and associated buildings is an increasingly important issue due to climate change. As such, the effects of a project's location and climate are considered early in the design process to ensure success. As requested, included below is a list of executed agreements made between the firm and local municipalities, with similar scope to the RFP, within the last (5) years. Executed Contracts Within the Last (5) Years • City of Miami, Department of Environmental Resource Management, Laboratory Fume Hoods Replacement, Miami, FL • U.S. Department of Homeland Security, United States Coast Guard, H Irma Station, Marathon, FL • St. Lucie County Florida, Solid Waste to Energy Conversion Facility, Fort Pierce, FL • University of Miami, Medical Campus Master Plan, Miami, FL • Florida Advanced Manufacturing Research Center, Osceola County, FL 19 VANDERWEI L Location Miami, FL Project Type Laboratory Renovation Building Type Science & Research Facility Size 10,000 sf Est. Construction Cost $2,000,000 Project Highlights • New fume hoods • New ducted stainless steel exhaust system with new exhaust fans and new supply ductwork • New chilled water air handling units and VAV terminal boxes with electric re -heat Sustainable Design Features • New high efficiency custom and chilled water air handling unit with VFD's • New HVAC controls throughout the space to control the new VAV boxes, air handling unit and exhaust fans • New fume hoods with VAV controls City of Miami DERM Laboratory Fume Hoods Replacement A $2,000,000 upgrade of existing The upgrades included new chilled laboratories and support spaces on the water air handling units and VAV first floor of the City of Miami's DERM terminal boxes with electric re -heat Laboratory. Eight fume hoods and their Vanderweil provided mechanical, associated mechanical systems were electrical, plumbing, and fire protection replaced. engineering. Labs were retro -fitted with a new ducted stainless steel exhaust system, new exhaust fans and new supply ductwork 20 Location Marathon, FL Project Type Renovation Building Type Government Building Architect Gurri Matute Project Highlights • MEP drawings and specifications suitable for permit, bidding, and construction administration. • Building controls and fuel systems for the fuel farm including piping, controls, and fuel oil tanks to accommodate the new and demolition layouts of the program. • Power to the new HVAC equipment, switchboards, lighting design, and circuiting • New domestic and hot water, sanitary, vent, condensate, and storm systems. U.S. Department of Homeland Security United States Coast Guard, H Irma Station k Engineering design services for the The scope of design consists of renovation of the Station Marathon interior renovation, infrastructure for the U.S. Department of Homeland enhancements, fuel farm replacement, Security, United States Coast Guard. exterior lighting replacement and complementary plumbing, as well as The site is made up of several buildings, mechanical and electrical power work including a two-story administration for all buildings on the campus. building, single -story office and storage building, and a boathouse which is a single -story building that houses a repair shop, and storage. M VANDERWEILI Location Kernersville, NC Project Type New Construction Building Type Medical Office Building / Outpatient Surgery Size 375,000 sf Cost $100,000,000 Owner Lend Lease Healthcare Development Tenant U.S. Department of Veterans Affairs Architect Perkins Eastman Project Highlights • Clinics for virtually all veterans' healthcare needs • Emergency power generation and UPS systems • Outpatient surgery suite with four procedure rooms • Full pharmacy • Flexible design to allow for changing needs Sustainable Design Features • High -efficiency chilled water plant • Optimized envelope design • Reduced lighting power density incorporating daylighting controls U.S. Department of Veterans Affairs Health Care Center This new 375,000 sf Health Care Center The program includes a station and and medical office building. systems for the police to be located within the building, and there is a full - The program includes behavioral health, service canteen for patient and visitor dialysis, women's health, audiology, dining. The building achieved LEED dental, pulmonary, cardiology and eye Gold® certification. clinics, among several others. There is an outpatient surgery suite with four independent operating rooms, radiology, and nuclear medicine. 22 VA N D E RW E I L7 (3) References of Work U.S. Department of Homeland Security, United States Coast Guard, H Irma Station, Marathon, FL Engineering design services for the renovation of the Station Marathon. Scope of design consists of interior renovation work, infrastructure enhancements, fuel farm replacement, exterior lighting replacement and complementary plumbing, as well as mechanical and electrical power work. Year Completed: Ongoing Mr. Virgil Campaneria, AIA NCARB Principal Gurri Matute P: (305) 661-0069 E: vcampaneria@gurrimatute.com Indian River State College, Workforce Training Center, Fort Pierce, FL A 50,000 gsf two-story academic training building consisting of electrical, plumbing, metal joining, automotive, computer/electronics, marine, aviation, and diesel laboratories as well as classrooms, administration offices, and conference rooms. The project is pursuing Green Globes° targeting four Globes. Year Completed: Ongoing, Est. 11/2020 Mr. Joseph J. Sorci, AIA, LEED BD+C, GGP President Florida Architects, Inc. Panama City, FL p: 850.257.5400 e: jsorci@floridaarchitects.com U.S. Department of Veterans Affairs, Health Care Center, Kernersville, NC New 375,000 sf outpatient health center including surgery, sterile processing department, and laboratory suites. Clinics include behavioral health, women's health, radiology, primary care, audiology and pulmonary medicine. Project includes a police department with readiness training room and weapons storage. The building achieved LEED Gold®. Year Completed: 2015 Mr. F. Bradford Drake Principal and Director Perkins Eastman P: (415) 926-7902 E: r.drake@perkinseastman.com VANDERWEILq William B. Sellon, CPD, LEED APO Principal-in-Charge/Project Manager Overview William is an Associate Principal and Regional Director with almost 25 years of experience in client and project management for state-of-the-art government and commercial buildings. He has extensive experience in facility master planning as well as cost and schedule management. He is a diligent and dependable leader able to effectively direct teams, coordinate with contractors, and ensure client satisfaction. Related Project Experience 24 • City of Miami, Department of Environmental Resource Management, Education Laboratory Fume Hoods Replacement, Miami, FL Replacement of eight existing fume hoods with new Kewaunee Scientific A.S., Mechanical Engineering, fume hoods within four laboratories along with replacing the existing Massasoit Community College, ductwork. 1998 • U.S. Department of Homeland Security, United States Coast Guard, H Registrations Irma Station, Marathon, FL Engineering design services for the renovation of the Station Marathon LEED AP -9 for the U.S. Department of Homeland Security, United States Coast Certified Plumbing Designer, Guard. The site is made up of several buildings, including a two-story 2002 administration building, single -story office and storage building, and a Certified Medical Gas Inspector - boathouse which is a single -story building that houses a repair shop, and NEPA 99C, 1999, 2002 & 2005 storage. The scope of design consists of interior renovation, infrastructure enhancements, fuel farm replacement, exterior lighting replacement and Professional Activities complementary plumbing, as well as mechanical and electrical power work for all buildings on the campus. American Society of Heating, U.S. Department of Veterans Affairs, Health Care Center, Kernersville, NC Refrigerating, and Air- Conditioning Engineers New 375,000 sf outpatient health center including surgery, sterile (ASHRAE) processing department, and laboratory suites. Clinics include behavioral health, women's health, radiology, primary care, audiology and pulmonary American Society of Plumbing medicine. Project includes a police department with readiness training Engineers (ASPS) room and weapons storage. The building achieved LEED° Gold Florida Healthcare Engineering certification. Association (FHEA) The National Guard Bureau, U.S. Army Garrison at West Point, Scott Barracks RFPs and Modernization Plan, Task Order for National A-E National Fire Protection Agency IDIQ, West Point, NY (NFPA) This task order included the development of a plan to modernize nine National Fire Protection existing barracks: Scott Barracks, Grant Barracks, Lee Barracks, Sherman Engineers Barracks, Pershing Barracks, MAC Short Barracks, MAC Long Barracks, Eisenhower Barracks, and Bradley Barracks; development of RFP and 10% U.S. Green Building Council design for Scott Barracks; and development of a design/build RFP for Scott (USGBC) Barracks. • University of Miami, Medical Campus Master Plan, Miami, FL MEP/FP engineering, master planning, and technology design services for the University of Miami Medical Campus and satellite buildings in South Florida. The master plan will include a high level overview of the major MEP/FP/T infrastructure to support the Universities projected growth over the next 10 years. Prior Experience • Broward County Convention Center Expansion, Fort Lauderdale, FL The project consisted of 230,000 gsf expansion which brought the total gsf to 600,000. New space included a 50,000 sf exhibition space, additional meeting rooms, pre -function space and administrative offices. 24 VANDERWEILq Education B.S., Mechanical Engineering, Florida International University, 2004 Registrations Professional Engineer (Mechanical): FL LEED AP® Mauricio Vargas, PE, LEED AP' Senior Mechanical Engineer Overview Mauricio is a Senior Mechanical Engineer with over 15 years of experience in designing chiller plants, government buildings, commercial, and industrial buildings. His experience has provided him with the ability to provide high quality designs, while successfully completing very challenging projects. Related Project Experience • City of Miami, Department of Environmental Resource Management, Laboratory Fume Hoods Replacement, Miami, FL Replacement of eight existing fume hoods with new Kewaunee Scientific fume hoods within four laboratories along with replacing the existing ductwork. U.S. Department of Homeland Security, United States Coast Guard, H Irma Station, Marathon, FL Engineering design services for the renovation of the Station Marathon for the U.S. Department of Homeland Security, United States Coast Guard. The site is made up of several buildings, including a two-story administration building, single -story office and storage building, and a boathouse which is a single -story building that houses a repair shop, and storage. The scope of design consists of interior renovation, infrastructure enhancements, fuel farm replacement, exterior lighting replacement and complementary plumbing, as well as mechanical and electrical power work for all buildings on the campus. Indian River State College, Building "O" Chiller Plant Upgrades, Fort Pierce, FL The "O" Building Chiller Plant serves various buildings throughout the campus including the new 50,000 sf WorkForce Training Center. The mechanical scope includes replacing existing chiller number 2 and chiller 3; along with the associated cooling towers and primary and condenser water pumps with two new centrifugal chillers. Electrical scope includes replacing the breakers in Main Distribution Panels (MDP) 1 and 2 serving the chillers, cooling towers, and pumps. Indian River State College, Building Q, Engineering Upgrades, Fort Pierce, FL The 10,000 sf radio station building includes a new storefront glass and entryway with new lighting. Mechanical systems throughout the building were upgraded to remove the existing exterior chilled water make-up air unit and fan coil units. This provided two new 15 -ton chilled water indoor air handling units with all new supply and return ductwork, VAV terminal boxes with electric reheat and BAS controls. • Coconut Grove, Metro Station Upgrade, Miami, FL MEP/FP/T engineering and lighting design to support upgrades to the metro station to support the new retail development across the street from the Grove Central project that Vanderweil is currently working on. Prior Experience • Miami Dade County Public Schools, Miami, FL Survey of over 50 public schools (K-12) in the Miami area. Conducted and reported conditions of all mechanical equipment and systems. • Miami Dade County Public Schools, Various Renovations, Miami, FL Design and preparation of mechanical construction plans for the remodeling of over 20 educational facilities. Included replacement of air handling units, chiller plants, air distribution, etc. 25 q Felix De la Noval, PE, LEED AP BD+C VAN D E RW E I L Senior Electrical Engineer Overview Felix is a Senior Electrical Engineer with over 30 years of experience in the field .1 of electrical engineering and lighting design. He specializes in power distribution 1 and controls, technological upgrades and retrofit, audio, telecommunications, security and fire protection as well as energy audits and conservation for government and commercial projects. r ' RIV Related Project Experience Y4. City of Miami, Department of Environmental Resource Management, Laboratory Fume Hoods Replacement, Miami, FL Education Replacement of eight existing fume hoods with new Kewaunee Scientific fume hoods within four labs along with replacing the existing ductwork. B.S., Electrical Engineering, University of Havana, 1972 U.S. Department of Homeland Security, United States Coast Guard, H Irma Station, Marathon, FL Registrations Engineering design services for the renovation of the Station Marathon for the U.S. Department of Homeland Security, United States Coast Professional Engineer (Electrical): Guard. The site is made up of several buildings, including a two-story FL administration building, single -story office and storage building, and a boathouse which is a single -story building that houses a repair shop, and LEED AP BD+C storage. The scope of design consists of interior renovation, infrastructure enhancements, fuel farm replacement, exterior lighting replacement and complementary plumbing, as well as mechanical and electrical power work for all buildings on the campus. • Indian River State College, Building N, Science Building and Chiller Plant Engineering Due Diligence, Fort Pierce, FL MEP/FP engineering due diligence services to an existing 3 -story, 30,000 sf Science building "N" which includes chemistry, biology and physics labs to evaluate the utilities and infrastructure and to support converting the heating hot water system to electric and removing the above ceiling AHUs and moving them into new mechanical rooms. • Indian River Medical Center, New Interventional Stroke Center, Vero Beach, FL New bi-plane operating room including an equipment and control room, soiled room, clean room, patient toilet and 8 bed prep/recovery suite with a nurses station and patient toilet room in the interventional stroke department on the 2nd floor of the hospital. • Indian River State College, Building "O" Chiller Plant Upgrades, Fort Pierce, FL The "O" Building Chiller Plant serves various buildings throughout the campus and including the new 50,000 sf WorkForce Training Center. The mechanical scope includes replacing existing chiller number 2 and chiller 3, along with the associated cooling towers and primary and condenser water pumps with two new centrifugal chillers. Electrical scope includes replacing the breakers in Main Distribution Panels (MDP) 1 and 2 serving the chillers, cooling towers, and pumps. • University of Miami, Medical Campus Master Plan, Miami, FL Master plan for the University of Miami Medical Campus and satellite buildings in South Florida included a high-level overview of the major MEP/ FP/T infrastructure to support the university's projected growth over the next 10 years. This project included a master plan and assessment of the infrastructure and facilities condition. The project also included a review of the building and facilities assessment prepared by Accruent, a physical resource management system, to determine if any gaps existed. 26 VANDERWEILI Education B.S., Mechanical Engineering, Oriente University, Santiago de Cuba. 2005 Professional Activities American Society of Mechanical Engineers (ASME) Rashidi Lee Plumbing Engineer Overview Rashidi is a plumbing engineer with 5 years experience in the engineering of plumbing systems for academic and laboratory projects. He oversees projects from begin to end, and plays an integral role in the success of project development through to completion. He has expertise in the sizing, coordination and field investigation of plumbing systems. Related Project Experience • City of Miami, Department of Environmental Resource Management, Laboratory Fume Hoods Replacement, Miami, FL Replacement of eight existing fume hoods with new Kewaunee Scientific fume hoods within four laboratories along with replacing the existing ductwork. U.S. Department of Homeland Security, United States Coast Guard, H Irma Station, Marathon, FL Engineering design services for the renovation of the Station Marathon for the U.S. Department of Homeland Security, United States Coast Guard. The site is made up of several buildings, including a two-story administration building, single -story office and storage building, and a boathouse which is a single -story building that houses a repair shop, and storage. The scope of design consists of interior renovation, infrastructure enhancements, fuel farm replacement, exterior lighting replacement and complementary plumbing, as well as mechanical and electrical power work for all buildings on the campus. Indian River State College, Building Q, Engineering Upgrades, Fort Pierce, FL The 10,000 sf radio station building. The lobby includes a new storefront glass and entryway with new lighting. Mechanical systems throughout the building were upgraded to remove the existing exterior chilled water make-up air unit and fan coil units. This provided two new 15 -ton chilled water indoor air handling units with all new supply and return ductwork, VAV terminal boxes with electric reheat and BAS controls. • Indian River State College, Workforce Training Center, Fort Pierce, FL A 50,000 gsf two-story academic training building consisting of electrical, plumbing, metal joining, automotive, computer/electronics, marine, aviation, and diesel laboratories as well as classrooms, administration offices, and conference rooms. The project is pursuing Green Globes® targeting four Globes. • Grove Central, Retail and Residential Development, Miami, FL A new 23 -story mixed-use complex located in the Coconut Grove District of Miami, FL. The 660,000 sf complex includes a 4 -story commercial retail/ parking building of approximately 170,000 sf and three levels of retail. The residential building consists an apartment tower with 336 rental units. The building is designed per the Florida Green Building Silver requirements. Prior Experience • Divine Savior Academy, Delray Beach, FL* New construction of 41,600 sf of educational campus spaces on 10 acres of land. The design scope included mechanical, electrical, and plumbing. `performed with prior firm 27 1 VANDERWEIL Corporate Standing and Authorized Signatory Section G Vanderweil as a company is in good standing and the person signing this submittal, Willaim B. Sellon, is an Authorized Signatory on behalf of the respondent to sign bids, #� proposals, contracts, agreements, and related documents. 4 Attached is Vanderweil's Certificate of Status with the state of Florida as well as athe firm's Certificate of Good Standing. 29 VANDERWEILI Corporate Standing and Authorized Signatory Section G �'�=�rOCi Bppaxtl pnt of 1'tttYP I certify from the records of this office that R.G. VANDERWEIL ENGINEERS, LLP is a Delaware partnership, filed on November 17, 2005. The document number issued to this registration is LLP050004324. I further certify said partnership has not been canceled. CWE022 (01-11) Given under my hand and the Great Seal of the State of Florida at Tallahassee, the Capital, this the Fourth day of February, 2020 30 GaureCJbl. Gee Secretary of State 1 VANDERWEIL Corporate Standing and Authorized Signatory Section G �;7zel (q'o1n1no1zc&eczLt4�11f-aswackmetts, �f crtctai �J t�� Call -i ��o iemak . male Aawe;OslQrz;/lassac<<tsells 02/33 William Francis Galvin Secretary of the Commonwealth March 8, 2019 TO WHOM IT MAY CONCERN: I hereby certify that a certificate of registration of a Foreign Limited Liability Partnership was filed in this office by R. G. VANDERWEIL ENGINEERS, LLP in accordance with the provisions of Massachusetts General Laws Chapter 108A on March 21, 2003. I also certify that said Foreign Limited Liability Partnership has filed all reports due and paid all fees with respect to such reports; that said registration has not been withdrawn or revoked; and that, so far as appears of record, said Foreign Limited Liability Partnership has legal existence and is in good standing with this office. I further certify that the names of the partners authorized with respect to real property listed in the most recent filing are: RAIMUND G. VANDERWEIL JR. Processed By:sam In testimony of which, I have hereunto affixed the Great Seal of the Commonwealth on the date first above written. Secretary of the Commonwealth 01 �'ry OF SO P'r DELIVER TO; REQUEST FOR City of Sunny Isles Beach QUALIFICATIONS OPENING: 2:30 P.M. City Clerk SECTION 6 Tuesday, August 11, 18070 Collins Avenue RESPONDENT SUBMITTAL 2020 Sunny Isles Beach, FL 33160 FORMS NOTE: City of Sunny Isles Beach is exempt from all taxes (Federal, State, and Local). Tax Exemption Certificate furnished upon request. Issued by: Purchasing Agent Date Issued: This Qualification Submittal Genesis Cuevas Wednesday, July 8, Consists of all required forms, 2020 including SF330, Questionnaires, Acknowledgements and Affidavits Submissions are subject to the Terms and Conditions of this Request for Qualifications and the accompanying Submittal. Such other contract provisions, specifications, drawings or other data as are attached or incorporated by reference in the Submittal, will be received at the office of the City Clerk at the address shown above until the above stated time and date, and at that time, publicly opened for furnishing services described in the accompanying Submittal Requirement. RFQ No. 20-07-01 Continuing Contract for Professional Services CCNA Firm Name Commodity Code(s): Leave blank per Addendum #1 RETURN ONE ORIGINAL AND FOUR COPIES OF QUALIFICATION SUBMITTAL PAGES AND AFFIDA VI TS FAILURE TO SIGN PAGE 38 OF SECTION 6 QUALIFICATION SUBMITTAL WILL RENDER YOUR SUBMISSION NON-RESPONSIVE City of Sunny Isles Beach I Request for Qualifications No. 20-07-01 33 `'r, or SO PNv 6.1 ACKNOWLEDGEMENT FORM NAME OF COMPANY: R.G. Vanderweil Engineers, LLP (Name of company submitting RFQ) CHECK CATEGORY (CATEGORIES) YOU ARE APPLYING FOR: 1- ARCHITECTS 2- CIVIL ENGINEERS 3- ELECTRICAL ENGINEERS X 4- SURVEYORS AND MAPPING 5- LEAK DETECTION STUDIES 6- MECHANICAL, HVAC & PLUMBING ENGINEERS X 7 - GEOTECHNICAL 8 — STRUCUTRAL ENGINEERS 9 — ENVIRONMENTAL ENGINEERS 10. CONSTRUCTION ENGINEERING AND INSPECTION (CEI) SERVICES City of Sunny Isles Beach I Request for Qualifications No. 20-07-01 34 REQUIRED FORMS PRIME FIRM `'rr or Sj}a, Role Name of Individual Number of Years' Education, Degree Assigned to Project Experience Principle m -Charge: William B. Sellon, 24 CPD, LEED AP - ------------------------ ------ Project Manager Asst. Project Manager Mechanical Engineer Other Key Member Electrical Engineer Other Key Member Plumbing Engineer REFERENCES A.S.; Mechanical Engineering, Massasoit Community College Coursework; Mechanical Engineering, Northeastern Universitv..-- --- -- -- PE LEED AP B.S., Electrical Engineering, Felix De La Nova[, 30 University of Havana PE, LEED AP BD+C Rashidi Lee. 5 B.S., Mechanical Engineering, i Oriente University Name Firm Providing A.S., Mechanical Engineering, William B. Sellon, 24 Massasoit Community College CPD, LEED AP Coursework, Mechanical Engineering, Northeastern --- --- - - - - University - i B.S., Mechanical Engineering, Mauricio. Vargas, 15 1 Florida International University _ PE LEED AP B.S., Electrical Engineering, Felix De La Nova[, 30 University of Havana PE, LEED AP BD+C Rashidi Lee. 5 B.S., Mechanical Engineering, i Oriente University Name Firm Providing Phone # Email Address Reference Mr. Virgil Campaneria, AIA NCARB (Principal) Gurri Matute 305 661-0069 ) vcampaneria@gurrimatute.com Mr. Joseph J Sorci, AIA, LEED Florida Architects, Inc. 850.257.5400 )sorci@floridaarchitects.com BD+C, GGP (President) - - - ----------- - - -- -- -- - Mr. F. Bradford Drake Princi al ( p ----. Perkins Eastman -- (415) 926-7902 r.drake@perkinseastman.com and Director) City of Sunny Isles Beach Request for Qualifications No. 20-07-01 35 '14 m SUS-' P" - ACKNOWLEDGEMENT OF ADDENDA INSTRUCTIONS: COMPLETE PART I OR PART II, WHICHEVER APPLIES PART I: LIST BELOW ARE THE DATES OF ISSUE FOR EACH ADDENDUM RECEIVED IN CONNECTION WITH THIS RFQ PART II: Addendum #1, Dated Friday, July 17, 2020 Addendum #2, Dated Tuesday, July 28, 2020 Addendum #3, Dated Monday, August 3, 2020 Addendum #4, Dated August 07, 2020 Addendum #5, Dated Addendum #6, Dated Addendum #7, Dated Addendum #8, Dated ❑ NO ADDENDUM WAS RECEIVED IN CONNECTION WITH THIS RFQ FIRM NAME: R.G. Vanderweil Engineers, LLP AUTHORIZED SIGNATURE: W -6- J)& J DATE: $/13/20 TITLE OF OFFICER: Associate Principal, Regional Director Miami Office City of Sunny Isles Beach I Request for Qualifications No. 20-07-01 36 ADDENDUM # 1 DATE: Friday, July 17, 2020 TO: ALL PLANHOLDERS FROM: Purchasing Administrator BID NO.: RFQ 20-07-01 Continuing Professional Consulting Services (CCNA) SUBJECT: Addendum No. 1 BID SUBMITTAL DEADLINE: Tuesday, August 11, 2020 at 2:30 PM Please attach this addendum to the documents in your possession and include the Acknowledgement of Addenda form with your response incorporated with the Request for Qualifications. Revisions: (Note Deletions .will be indicated by*���^+"� ^� - — _t _. _ _ ,.ad( itions will ';be ndicated with bold font); Q1. We do not have an architecture license, but do have a landscape architecture license and would like to submit for landscape architecture services. Please confirm that a registered Landscape Architecture firm can submit under Category 1—Architects. Al. The City is currently not soliciting for landscape architecture services under this continuing RFQ. Q2. Is LEED accreditation required if the respondent has and includes their professional license or is LEED accreditation required in addition to license? A2. LEED accreditation would be in addition to professional license. Q3. Re: SECTION 1: INSTRUCTIONS TO RESPONDENTS / GENERAL TERMS AND CONDITIONS, 1.24 CERTIFICATE (S) OF INSURANCE: "At the time of Firms submission the Firm must submit certificates of insurance as outlined in the General Conditions section. All required insurances shall name the City of Sunny Isles Beach as additional insured and such insurance shall be issued by companies authorized to issue insurance in the State of Florida." Do certificates naming the City as an additional insured need to be submitted with the RFQ response or are specimen certificates evidencing proof of coverage acceptable, provided the required certificates are submitted in the event of contract award? A3. Evidence of proof of coverage is acceptable at the time of submittal however, upon contract award the COI must have the City listed as an additional insured. Q4. Section 2.6.1 LICENSING REQUIREMENTS: "At a minimum, Respondents must have at least one (1) team member accredited in the United States Green Building Council Leadership in Energy and Environmental Design (LEED)." Is Envision Sustainability Professional (ENV SP) certification acceptable as a substitute? As civil engineers, this certification is more applicable to our potential scopes of work than LEED. A4. Yes for engineering disciplines. Q5. Section 5.0 FORMAT: E. Qualification Information and Assigned Personnel requests submission of "Form SF330, include Part I and Part ll" and F. Firm References and Similar Work Completed requests submission of Qualification Statement, resumes for proposed personnel, project experience, organizational chart, etc. As these items are included in the SF 330, does the City want the information repeated in both sections? A5. Firms may submit the SF 330 in lieu of resumes. Q6. Section 5.0 FORMAT, F. Firm References and Similar Work Completed, "The title and a brief description of each project and/or service shall include:... Item e. - Past 5 years copies of executed agreements made between your firm and local municipalities, with a scope similar to this RFQ. If sub -consultants are a part of the proposed work plan, include items A through E for each firm, including an organizational chart showing the relationship between the responding firm and the sub firm(s)." Does the City want executed agreements included for each project submitted as relevant experience, for each firm (prime and subs)? They are generally lengthy. A6. Due to the length of these agreements, if your firm has an active contract/PO within the past 5 years with local municipalities please state the agency's name, project scope and contract amount in lieu of attaching the contract(s). Q7. Does the City want copies of professional licenses included in Section E. Qualification Information and Assigned Personnel or Section H. Forms and Attachments? A7. Section E. Q8. Pg. 12 of the above referenced RFQ states on page 12 (see attached) that at least 1 Team member must be LEED Accredited. However we are a Structural Engineering Firm and as such LEED is not applicable to our services. Therefore no one on our staff Is LEED Accredited. Please advise if this precludes our firm from submitting for this solicitation. Thank you. A8. No, LEED would apply to architectural prime consultants. Q9. We are an environmental consulting firm interested in pursuing the subject RFQ for the "Environmental Engineering" discipline. However, Section 2.6.1 of the RFQ appears to eliminate us from eligibility and so I'm writing for some clarification. We are not an engineering, architecture, or landscape architecture firm. Our services are not regulated by the Florida Department of Business and Professional Regulation and so we could not meet the requirements of the last bullet of section 2.6.1, although we are properly registered and in compliance with the State of Florida (Division of Corporations). Is it the City's intent for the "Environmental Engineering" discipline to only be serviced by licensed engineering firms? I recognize the scope could be interpreted to focus on Phase I/Phase II Environmental Assessments, in which case we would not be qualified. But the broad description of "monitoring and mitigation, environmental studies and reports" and the permitting scope are commonly used to describe our work, albeit associated with wetlands, protected wildlife species, and water quality. I wanted to be sure this wasn't an opportunity we were missing due to a technicality the City didn't intend. A9. Environmental firms must comply with the requirements set forth in Section 2.6.1. of the RFQ, including that they be registered and in compliance with the State of Florida in addition to being licensed and registered with the Department of Business and Professional Regulation to practice in their profession in the State of Florida. Q10. We are pursuing the Civil Engineering Category. Civil engineering projects may require geotechnical, survey, environmental, and/or materials testing services, etc. Does the City want us to submit a team with these potential subconsultants or use the firms selected in those categories under this solicitation if awarded a task order requiring those disciplines? A10.Yes, please submit your list of sub -consultants. Ql 1. Page 33 of the RFQ asks for Commodity Codes. Does this refer to the categories or does the City want NAICS codes listed on the form? A11. You may leave this section blank. Q12. Does the City require separate submittals for pursuing multiple scopes? Al2. No, just make sure to indicate in section 6.1 the categories your firm is applying for. Q13. Can we submit only for the marine structures aspect of the Structural Engineering scope? Or would we have to pursue the entire category, including building structures? A13. You will need to submit for full structural services. Q14. Is it possible to submit under coastal/marine engineering being that that is our area of expertise? A14. Firm may submit under Environmental Engineering category. Q15. In the RFQ on page 1, it states all questions are due on Friday, July 17, 2020 by 5:00 PM. On page 3 it states, "All questions regarding this Request for Qualifications No. 20-07- 01 shall be directed in writing to Mauricio Betancur, CMC, City Clerk, Friday, July 24, 2020." Can you please clarify if questions are due on July 17, 2020 by 5:00 PM or July 24, 2020? A15. The questions due date is Friday, July 24, 2020. Q16. Landscape Architect is listed under licensing requirements on page 11 - 12 of the RFQ, which category should Landscape Architecture submit under? A16. The City is currently not soliciting for landscape architecture services under this continuing RFQ. Q.17 Surveyors and Mapping is listed in the scope of services, on page 11 - 12 it does not state licensing requirements for Surveying. To pursue for Surveyors and Mapping, can you please clarify if the firm and/or individual needs to be licensed? A17. The firm and/or individual needs to be registered in the State of Florida to engage in the practice of surveying and mapping under this contract. Q18. Under 2.6.1 Licensing Requirements, it states that the firm shall possess at minimum one of the following licenses; however, on the list, it also states that "at a minimum, respondents must have at least one LEED certified professional. Do you require all respondents to have a LEED certified professional in the team? 3 A18. Please refer to question # 8. Q19. What would be scope of the LEED certified professional? A19. Please refer to question # 8. Q20. Subconsultants may be inherent to work for several of the categories listed. For example, Civil Engineering may often require other support services (i.e. Survey, Geotechnical, MEP, Structural, Architecture, etc.). Shall we include any/all subconsultants we may need in order to accomplish any given task under this contract? A20. Yes, please submit your list of sub-consultant(s). Q21. Please elaborate on what, specifically. The City is looking for under Item E (i.e. performance records of key personnel, work orders, copies of contracts). Are contracts being requested or work orders for specific projects undertaken under continuing service contracts? A21. Please refer to question # 6. Q22. Does The City want individual project references or continuing service contracts references for this RFP? A22. Please refer to question # 6. Q23. Please elaborate on the first paragraph under Section E. Please differentiate which questions are geared towards key personnel and which questions are geared towards the firm, as they cannot be interchanged. A23. This information may be filled out according to the SF 330. Q24. Please elaborate on the following statement on page 31: "If sub -consultants are a part of the proposed work plan, include items A through E for each firm, including an organizational chart showing the relationship between the responding firm and the sub firm(s)." A24. Please include sub-consultant(s) qualifications as well with RFQ response, as required on page 31. 4 ADDENDUM # 2 DATE: Tuesday, July 28, 2020 TO: ALL PLANHOLDERS FROM: Purchasing Administrator BID NO.: RFQ 20-07-01 Continuing Professional Consulting Services (CCNA) SUBJECT: Addendum No. 2 BID SUBMITTAL DEADLINE: Tuesday, August 11, 2020 at 2:30 PM Please attach this addendum to the documents in your possession and include the Acknowledgement of Addenda form with your response incorporated with the Request for Qualifications. Q1. Will there be a pre-bid meeting/conference for this RFQ? Al. No. Q2. Section 2, 2.1 mentions Architectural, Civil Engineering, Electrical Engineering, Structural Engineering among other professional services. Does the city anticipate a need for Mechanical, Plumbing, Fire Protection Engineering? A2. This will be covered under the Architecture category as a sub -consultant to the Prime or within the Architecture Firm. Q3. Does the city know how many firms will be selected for each of the disciplines mentioned in Section 2, 2.1. A3. No, we do not have a minimum or maximum number for firms per category. Q4. Under Section 2.6 — "The successful firm must have a minimum of five (5) years business experience...." Question: Does the five years infer five years as a registered company or LLC, or experience in running a business? A4. The firm must have a minimum of 5 years in their respective discipline. Q5. Under Section 2.6.1— "....the firm shall possess at minimum one of the following licenses...." State of Florida Surveying and Mapping license is not listed. Question: Was this license omitted from the list in error? A5. The firm and/or individual needs to be registered in the State of Florida to qualify and engage in the practice of surveying and mapping under this contract. 1 Q6. Under Section 2.6.1— "At a minimum, Respondents must have at least one team member accredited in the United States Green Building Council Leadership in Energy and Environmental Design (LEED)" Question: Whereas Surveying and Mapping is not a design discipline, is the LEED certification required for a Surveying and Mapping team member? A6. No, LEED would apply to architectural prime consultants. Q7. Please clarify that subconsultants are required to provide an individual title page, individual table of contents, an individual approach and cover letter for the RFQ submittal for one team. Q24. Please elaborate on the following statement on page 31: "If sub -consultants are a part of the proposed work plan, include items A through E for each firm, including an organizational chart showing the relationship between the responding firm and the sub firm(s)." A24. Please include sub-consultant(s) qualifications as well with RFQ response, as required on page 31. A. Title Page B. Table of Contents C. Cover Letter and Executive Summary D. Project Approach and Understanding E. Qualification Information and Assigned Personnel A7. If sub -consultants are a part of the proposed work plan, include items A through E for each firm, including an organizational chart showing the relationship between the responding firm and the sub firm(s). a. Client Name, Address, Contact, Phone and Fax Numbers and valid e-mail address; b. Project Title; c. Description of work performed, including the project location; and d. Year completed. e. Past 5 years copies of executed agreements made between your firm and local municipalities, with a scope similar to this RFQ. Please refer to addendum # 1 regarding executed contracts. Fl rn ADDENDUM # 3 DATE: Monday, August 03, 2020 TO: ALL PLANHOLDERS FROM: Purchasing Administrator BID NO.: RFQ 20-07-01 Continuing Professional Consulting Services (CCNA) SUBJECT: Addendum No. 3 BID SUBMITTAL DEADLINE: Tuesday, August 11, 2020 at 2:30 PM Please attach this addendum to the documents in your possession and include the Acknowledgement of Addenda form with your response incorporated with the Request for Qualifications. Q1. Section 2, 2.1 mentions Architectural, Civil Engineering, Electrical Engineering, Structural Engineering among other professional services. Does the city anticipate a need for Mechanical, Plumbing, Fire Protection Engineering? A2. This will be covered under the Architecture category as a sub -consultant to the Prime or within the Architecture Firm. Based on the RFQ and attached 6.1 Form, my firm was hoping to submit for MEP services which are listed out separate from Architecture. The wording in the RFQ makes it seem as though you can submit for services labeled 1 through 10 in Form 6.1. Can we not submit without an Architecture prime for this RFQ? Al. Yes, you may submit separately. 1 RESPONDENT SUBMITTAL FORM RFQ 20-07-01 Continuing Professional Consulting Services (CCNA) The undersigned Firm proposes and agrees, if this submission is accepted, to enter into an agreement with the City of Sunny Isles Beach to perform and furnish all Services as specified or indicated in the Contract Documents. The Firm accepts all of the terms and conditions of this Request for Qualifications. This Bid will remain subject to acceptance for 90 days after the day of Bid opening. The Firms agrees to sign and submit the Agreement and other documents as required by the Bidding Requirements within ten days after the date of the City's Notice of Award. In submitting this response, the Firm represents, as more fully set forth in the Agreement, that: ■ The Firm has familiarized himself/herself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Law and Regulations that in any manner may affect cost, progress, performance, or furnishing of the Work. • The Firm has studied carefully all reports and drawings of subsurface conditions and drawings of physical conditions. ■ The Firm has given the City written notice of all conflicts, errors, discrepancies that it has discovered in the Contract Documents and the written resolution thereof by City is acceptable to the Firm. ■ This solicitation is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation; the Firm has not directly or indirectly induced or solicited any other Firms to submit a false or sham Bid; the Firm has not solicited or induced any person, firm or corporation to refrain from Bidding; and Firm has not sought by collusion to obtain for itself any advantage over any other Firms or over the City. The City and the successful Firm will establish completion times for the services described in this Request for Qualifications and the successful Firm agrees that the services will be completed within the time frames agreed upon and stipulated in the individual Notice to Proceed. City of Sunny Isles Beach I Request for Qualifications No. 20-07-01 37 l/ry or sw-4 PH_ Firm Name: R.G. Vanderweil Engineers, LLP Street Address: 8350 NW 52nd Terrace, Suite 300 1 Miami, FL 33166 Mailing Address (if different): Same as above. Telephone No. 305.501.5740 Fax No. N/A Email Address: Ivaughn@vanderweil.com FEIN No. 0 4-20 * "By signing this document the Responder agrees to aii Terms Signature: tWmw -6. JAJ (Signature of authorized agent) Print Name: William B. Sellon Title: Associate Principal, Regional Director Miami Office THE EXECUTION OF THIS FORM CONSTITUTES THE UNEQUIVOCAL OFFER OF FIRM TO BE BOUND BY THE TERMS OF ITS SUBMISSION. FAILURE TO SIGN THIS SOLICITATION WHERE INDICATED ABOVE BY AN AUTHORIZED REPRESENTATIVE SHALL RENDER THE SUBMISSION NON-RESPONSIVE. THE CITY MAY, HOWEVER, IN ITS SOLE DISCRETION, ACCEPT ANY SUBMISSION THAT INCLUDES AN EXECUTED DOCUMENT, WHICH UNEQUIVOCALLY BINDS THE FIRM TO THE TERMS OF ITS OFFER. City of Sunny Isles Beach I Request for Qualifications No. 20-07-01 38 SONNY V _ r _ �r � f a .09 p� ti �* F L 0 ON Sao F SU City of Sunny Isles Beach I Request for Qualifications No. 20-07-01 39 SJ14NY1'S�6 - NON -COLLUSION AFFIDAVIT City of Sunny Isles Beach 18070 Collins Avenue F.1, .0 0.�Qr y�r Sunny Isles Beach, FL 33160 c'Y or sur " Telephone: (305) 947-0606 Fax: (305) 949-3113 STATE OF FLORIDA COUNTY OF Miami -Dade) The undersigned being first duly sworn as provided by law, deposes, and says: E) ORIGINAL This Affidavit is made with the knowledge and intent that it is to be filed with the City of Sunny Isles Beach City Commission and that it will be relied upon by said County, in any consideration which may give to and any action it may take with respect to this Bid. The undersigned is authorized to make this Affidavit on behalf of, R.G. Vanderweil Engineers, LLP (Name of Corporation, Partnership, Individual, etc.) a, Limited Liability Partnership , formed under the laws of FL (Type of Business) (State) of which he is Regional Director (Sole Owner, Partner, President, etc.) Neither the undersigned nor any person, firm, or corporation named in above Paragraph 10.2, nor anyone else to the knowledge of the undersigned, have themselves solicited or employed anyone else to solicit favorable action for this Bid by the City, also that no head of any department or employee therein, or any officer of the City of Sunny Isles Beach, Florida is directly interested therein. This Bid is genuine and not collusive or a sham; the person, firm or corporation named above in Paragraph 10.2 has not colluded, conspired, connived or agreed directly or indirectly with any proposers or person, firm or corporation, to put in a sham Bid, or that such person, firm or corporation, shall refrain from Bidding, and has not in any manner, directly or indirectly, sought by agreement or collusion, or communication or conference with any person, firm or corporation, to fix the prices of said Bid or Bids of any other proposers; and all statements contained in the Bid or Bids described above true; and further; neither the undersigned, nor the person, firm or corporation named above in Paragraph 10.2, has directly or indirectly submitted said Bid or the contents thereof, or divulged information or data relative thereto, to any association or to any member or agent thereof. William B. Sellon Associate Principal, Regional Director AFFIANTS NAME AFFIANT'S TITLE TAKEN, SWORN AND SUBSCRIBED TO BEFORE ME this 30 day of July 20_20 Personally Known X or Produced Identification Type of identification Personally known (Affix seal here) Heather Marie Paliotti � Notary Public Ito COMMONWEALTH OF MASSACHUSETTS iY i,� My Commission Expires `f March 11, 2027 DECEMBER 28,2010 Heather Paliotti NOTARY PUBLIC (name printed or typed PUBLIC ENTITY CRIMES City of Sunny Isles Beach 18070 Collins Avenue SF i99' • r�E O y�r Sunny Isles Beach, FL 33160 rY or SUN ' Telephone: (305) 947-0606 Fax: (305) 949-3113 SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a) FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES PUBLIC ENTITY CRIMES Pursuant to the provisions of paragraph (2) (a) of Section 287.133, Florida State Statutes - "A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a Bid on a Contract to provide any goods or services to a public entity, may not submit a Bid on a Contract with a public entity for the construction or repair of a public building or public Work, may not submit Bids on leases of real property to a public entity, may not be awarded to perform Work as a Contractor, supplier, Sub -Contractor, or Consultant under a Contract with any public entity, and may not transact business with any public entity in excess of the threshold amount Category Two of Sec. 287.017, FS for thirty six months from the date of being placed on the convicted vendor list". THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS. 11.1. This sworn statement is submitted to City of Sunny Isles Beach by William B. Sellon, Associate Principal, Regional Director Miami Office [print individual's name and title] for R.G. Vanderweil Engineers, LLP [print name of entity submitting sworn statement] whose business address is: 8350 NW 52nd Terrace, Suite 3001 Miami, FL 33166 and (if applicable) its Federal Employer Identification number (FEIN) is 04-2452980 (If the entity had no FEIN, include the Social Security Number of the individual signing this sworn statement: N/A ) 11.2. 1 understand that a "public entity crime" as defined in Paragraph 287.133(1)(g), Florida Statutes, means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or with the United States, including, but not limited to, any Bid or Contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation. 11.3. 1 understand that "convicted" or "conviction" as defined in Para. 287.133(1)(b), Florida Statutes, means a finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trail court of record relating to charges brought by indictment or information after July 1, 1989, as a result of a jury verdict, non jury trial, or entry of a plea of guilty or nolo contendere. 11.4. 1 understand that an "affiliate" as defined in Para. 287.133(1)(a), Flo�ida Statutes, means a.) predecessor or successor of a person convicted of a public 6ritity crime; or b.) Any entity under the control of any natural person who is active-in-the:management.of.the-entity and who has been convicted of a public entity crime. The term "affiliate" includes those officers, directors, executors, partners, shareholders, employees, members, and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair DECEMBER28,2010 ORIGINAL market value under an arm's length agreement, shall be a prime facie case that one person controls another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall be considered an affiliate. 11.6. 1 understand that a "person" as defined in Para. 287.133(1)(e), Florida Statutes, means any natural person or entity organized under the laws of any state or of the United States with the legal power to enter into a binding Contract and which Bids or applies to Bid on Contracts for the provision of goods or services let by a public entity, or which otherwise transacts or applies to transact business with a public entity. The term "persons" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in management of any entity. 11.6. Based on information and belief, the statement which I have marked below is true in relation to the entity submitting this sworn statement. (Indicate which statement applies.) X Neither the entity submitting this sworn statement, nor any of it's officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, nor any affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. However, there has been a subsequent proceeding before a Hearing Officer of the State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer of the State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer determined that it was not in the public interest to place the entity submitting this sworn statement on the convicted vendor list. (Attach a copy of the final order.) I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 11.1 (ONE) ABOVE IS FOR THAT PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED. I ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES, FOR CATEGORY TWO OF ANY, CHANGE IN THE INFORMATION CONTAINED IN THIS FORM. By: (Signature) William B. Sellon (Printed Name) Associate Pron (Title) Sworn to and subscribed before me this 30 r Paliotti iia her"Mari�e Pallotti e Notary Public COMMONWEALTH OF MASSACHUSETTS My Cammission expires f March 11, 2027 day of July , 20 20 , by Signature, v ).moi ,�"ZZE Personally Known X OR Produced Identification ORIGINAL OE S�N�Y IS�Fj.� CONFLICT OF INTEREST V _ ' City of Sunny Isles Beach 18070 Collins Avenue y i99, F,L OR y"p Sunny Isles Beach, FL 33160 'r o r $ UN " Telephone: (305) 947-0606 Fax: (305) 949-3113 CONFLICT OF INTEREST STATEMENT The award of any contract hereunder is subject to the provisions of Chapter 112, Florida State Statutes. Proposers must disclose with their Bids, the name of any officer, director, partner, associate or agent who is also an officer or employee of the City of Sunny Isles Beach or its agencies. STATE OF FLORIDA COUNTY OF Miami -Dade BEFORE ME, the undersigned authority, personally appeared William B. Sellon who was duly sworn, deposes, and states: 18.1. 1 am the Associate Principal and Regional Director of __R.G. Vanderweil Engineers, LLP with a local office in Miami, FL and principal office in Boston, MA 18.2. The above named entity is submitting a Bid for the City of Sunny Isles Beach, RFQ No. 20-07-01 described as: RFQ Professional services. The Affiant has made diligent inquiry and provides the information contained in this Affidavit based upon his own knowledge. 18.3 The Affiant states that only one submittal for the above Bid is being submitted and that the above named entity has no financial interest in other entities submitting Bids for the same project. 18.4 Neither the Affiant nor the above named entity has directly or indirectly entered into any agreement, participated in any collusion, or otherwise taken any action in restraints of free competitive pricing in connection with the entity's submittal for the above Bid. This statement restricts the discussion of pricing data until the completion of negotiations if necessary and execution of the Contract for this project. 18.6 Neither the entity nor its affiliates, nor any one associated with them, is presently suspended or otherwise ineligible from participation in contract letting by any local, State, or Federal Agency. 18.6 Neither the entity, nor its affiliates, nor any one associated with them have any potential conflict of interest due to any other clients, contracts, or property interests for this project. 18.71 certify that no member of the entity's ownership or management is presently applying for any employee position or actively seeking an elected position with the City of Sunny Isles Beach. 18.81 certify that no member of the entity's ownership or management, or staff has a vested interest in any aspect of the City of Sunny Isles Beach. 18.9 In the event that a conflict of interest is identified in the provision of services, I, on behalf of the above named entity, will immediately notify the City of Sunny Isles Beach. Dated this 30 day of July 2020. William B. Sellon Assnriate Principal Regional Director AFFIANT Print or Type Name and Title Sworn to and subscribed before me this 30 day of July , 2020. ® Personally Known OR O Produced Identification ; Type of Identification Jr NOTARY PUBLIC STATE OF FLORIDA EO Heather Marie Paliotti Notary Public OMMONWEALTH OF MASSACHUSETTS My Commission Expires DECEMBER 28, 2010 March 11, 2027 �o�SurINY �s��s@� EQUAL OPPORTUNITY / AFFIRMATIVE ACTION yF C99��f,L00.�QOh�Y City of Sunny Isles Beach ty Of SllN " 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 EQUAL OPPORTUNITY/AFFIRMATIVE ACTION STATEMENT The contractors and all subcontractors hereby agree to a commitment to the principles and practices of equal opportunity in employment and to comply with the letter and spirit of federal, state, and local laws and regulations prohibiting discrimination based on race, color, religion, national region, sex, age, handicap, marital status, and political affiliation or belief. Signed: W0� -j, jvx,� Title: Associate Principal, Regional Director Miami Office Firm: R.G. Vanderweil Engineers, LLP Address: 8350 NW 52nd Terrace, Suite 3001 Miami, FL 33166 DECEMBER28,2010 43 O� S,pI N Y t7 t n DISPUTE DISCLOSURE City of Sunny Isles Beach 18070 Collins Avenue F I OP+`p Sunny Isles Beach, FL 33160 'Y or SU °` Telephone: (305) 947-0606 Fax: (305) 949-3113 DISPUTE DISCLOSURE FORM Answer the following questions by placing a "X" after "Yes" or "No". If you answer "Yes", please explain in the space provided, or on a separate sheet attached to this form. 19.1. Has your firm or any of its officers, received a reprimand of any nature or been suspended by the Department of Professional Regulations or any other regulatory agency or professional associations within the last five (5) years? YES NO X 19.2. Has your firm, or any member of your firm, been declared in default, terminated or removed from a contract or job related to the services your firm provides in the regular course of business within the last five (5) years? YES NO X 19.3. Has your firm had against it or filed any requests for equitable adjustment, contract claims, Bid protests, or litigation in the past five (5) years that is related to the services your firm provides in the regular course of business? YES NO X If yes, state the nature of the request for equitable adjustment, contract claim, litigation, or protest, and state a brief description of the case, the outcome or status of the suit and the monetary amounts of extended contract time involved. I hereby certify that all statements made are true and agree and understand that any misstatement or misrepresentation of falsification of facts shall be cause for forfeiture of rights for further consideration of this Bid for the City of Sunny Isles Beach. R.G. Vanderweil Engineers, LLP 7/30/20 FIrIn llwm--fl� -6. Authorized Signature Date William B. Sellon, Associate Principal, Regional Director Print or Type Name and Title DECEMBER 28,2010 45 O�SUN y'S(FJ, A m P y FLO?' y,v A C�rY Or SM" T°�O STATE OF FLORIDA ) COUNTY OF Miami -Dade ) ANTI -KICKBACK City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 ANTI -KICKBACK AFFIDAVIT ..s I, the undersigned, hereby duly sworn and deposed say that no portion of this sum herein Bid will be paid to any employees of the City of Sunny Isles Beach or its elected officials as a commission, kickback, reward or gift, directly or indirectly by me or any member of my firm or by an officer of the corporation. By: William B. Sellon Title: Associate Principal, Regional Director The foregoing instrument was acknowledged before me this 30 day of July , 2020I by Heather Paliotti [name of person], as Notary Public [type of authority], for R.G. Vanderweil Engineers, LLP [name of party on behalf of whom instrument was executed]. AFFIX NOTARY STAMP HERE: Heather Marie Paliotti * Notary Public COMMONWEALTH OF MASSACHUSETTS My Commission Expires March 11, 2027 Notary Public — State of Florida Heather Paliotti Print or Type Commissioned Name Personally Known X OR Produced Identification Type of Identification Produced DECEMBER28,2010 R�. .. "/n.. �. .1 �. - , �� �} cL ... ,t �� .. � i .... .: ...... :'�.:., Of SV,.IJY I SCES9 A f CONTRACTOR ANTI -BOYCOTT CERTIFICATION [PURSUANT TO FLORIDA STATUTE § 215.47251 j� William B. Sellon , on behalf of R.G. Vanderweil Engineers, LLP Print Name Company Name certifies that R.G. Vanderweil Engineers, LLP does not: Company Name 1. Participate in a boycott of Israel; and 2. Is not on the Scrutinized Companies that Boycott Israel list; and 3. Is not on the Scrutinized Companies with Activities in Sudan List; and 4. Is not on the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List; and 5. Has not engaged in business operations in Cuba or Syria. Signature Associate Principal, Regional Director Title 7/30/20 Date 47 VnlunF-'1 VIP In. Ptr' ACORO, CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY) 01/30/2020 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(les) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER 781-245-5400 Poole Professional B&B of MAP 107 Audubon Rd, #2, Ste 305 Wakefield, MA 01880 Christopher A. Poole CONTACT Christopher A. Poole HONE 781-245-5400 FAX 781-245-5463 (A/C, No, Ext): (A/C, No): ADDRESS: X COMMERCIAL GENERAL LIABILITY CLAIMS -MADE u OCCUR INSURERS AFFORDING COVERAGE NAIC # INSURER A: Travelers Property Casualty Co 25674 01/01/2020 RN U D .G. Vandernwell Engineers PCP 274 SummerStreetg Boston, MA 02210 INSURER B: Travelers Indemnity Co of CT 25682 Valle Fore Insurance Company 20508 INSURER y g p y INSURER D:XL Specialty Insurance Company 37885 INSURER E : INSURER F: PnX1l=0A!_CC r`CDTicif, ATC d111AADCD. D01110In41 K11 IAADCn. THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE DDL UBR POLICY NUMBER POLICY EFF POLICY EXPLTR LIMITS A X COMMERCIAL GENERAL LIABILITY CLAIMS -MADE u OCCUR 6806H928766 01/01/2020 01/01/2021 EACH OCCURRENCE $ 1,000'000 DAMAGE TO RENTED 1,000,000 PREMISES Ea occurrence $ X Contractual Liab MED EXP (Any oneperson) $ 10,000 PERSONAL & ADV INJURY $ 1,000,000 GENT AGGREGATE LIMIT APPLIES PER: POLICY ❑X PECOT- D LOC GENERAL AGGREGATE $ 2'000'000 PRODUCTS-COMP/OPAGG $ 2,000,000 OTHER: B AUTOMOBILE LIABILITY CMBINED SINGLE LIMIT 1,000,000 EaOaccident $ BODILY INJURY Perperson) $ ANY AUTO BA75081_417 01/01/2020 01/01/2021 OWNED SCHEDULED AUTOS ONLY AUTOS BODILY INJURY Per accident $ PROPERTY DAMAGE Per accident $ X HIRED X NON -0 NED AUTOS ONLY AUTOS ONLY A X UMBRELLA LIAB X OCCUR EACH OCCURRENCE $ 10,000'000 AGGREGATE $ 10'000,000 EXCESS LIAB CLAIMS -MADE CUP8163Y625 01/01/2020 01/01/2021 DED I X I RETENTION $ 10,000 C WORKERS COMPENSATIONPER AND EMPLOYERS' LIABILITY Y / N ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MCER/MEMBER EXCLUDED? (Mandatoryin NH) If yes, describe under DESCRIPTION OF OPERATIONS below N / A 6049607312 MA NH NJ NY PA VA FL AZ 05/01/2019 05/01/2020 OTH- X STATUTE ER E.L. EACH ACCIDENT $ 1,000,000 E.L. DISEASE - EA EMPLOYEE $ 1,000,000 E.L. DISEASE - POLICY LIMIT 1,000,000 D Arch/Eng E&O DPR9956120 02/15/2020 02/15/2021 Per Claim 5,000,000 incl PollutionLiab RETRO 1/1/1947 Aggregate 5,000,000 DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) I j SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE R.G. Vanderweil Engineers LLP THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN g ACCORDANCE WITH THE POLICY PROVISIONS. R.G. Vanderweil Engineers PC 274 Summer Street Boston, MA 02210 AUTHORIZED REPRESENTATIVES ACORD 25 (2016/03) ©1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo areHegistered marks of ACORD ARCHQUALIFICATIONS PART I - CONTRACT -SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1. TITLE AND LOCATION (City and State) Continuing Professional Consulting Services (CCNA), City of Sunny Isles Beach 2. PUBLIC NOTICE DATE 3. SOLICITATION OR PROJECT NUMBER Wednesday, July 8, 2020 No. 20-07-01 B. OFFEROR POINT OF CONTACT 4. NAME AND TITLE William B. Sellon, Associate Principal, Regional Director Miami Office S. NAME OF FIRM q VAN D E RW E I LR.G. Vanderweil Engineers, LLP 6. TELEPHONE NUMBER 7. FAX NUMBER 8. EMAIL ADDRESS 305.501.5740 n/a wsellon@vanderweil.com C. PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors) (Check) w z o 'C 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT a. a a f �a mU aim R.G. Vanderweil Engineers, LLP 8350 NW 52nd Terrace, Suite a X MEP Engineering Services 300, Miami, FL 33166 0 CHECK IF BRANCH OFFICE b. ❑ CHECK IF BRANCH OFFICE C. ❑ CHECK IF BRANCH OFFICE d. ❑ CHECK IF BRANCH OFFICE e. ❑ CHECK IF BRANCH OFFICE f. ❑ CHECK IF BRANCH OFFICE D. ORGANIZATIONAL CHART OF PROPOSED TEAM 0 (Attached) AUTHORIZED FOR LOCAL REPRODUCTION 50 STANDARD FORM 330 (REV. 8/2016) Part II - GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seekina work.) 2a. FIRM (OR BRANCH OFFICE) NAME 1 R.G. Vanderweil Engineers, LLP VA N D E RW E I Ly 3. YEAR ESTABLISHED 2015 4. UNIQUE ENTITY IDENTIFIEI 1 05-345-4823 2b. STREET Brickell City Tower, 80 SW 8th Street, Suite 2160 5. OWNERSHIP a. TYPE LLP — Limited Liability Partnership 2c. CITY Miami 2d. STATE FL 12e.ZIPCODE 33130 b. SMALL BUSINESS STATUS N/A 6a. POINT OF CONTACT NAME AND TITLE Eli Sherman, PE, President/CEO 7. NAME OF FIRM (If block 2a is a branch office) R.G. Vanderweil Engineers, LLP 6b. TELEPHONE NUMBER 617-423-7423 6c. E-MAIL ADDRESS esherman@vanderweil.com 8a. FORMER FIRM NAME(S) (If any) 8b. YR. ESTABLISHED 8c. UNIQUE ENTITY IDENTRIER R.G. Vanderweil Engineers, Inc. 1950 05-345-4823 C 1 10. PROFILE OF FIRM'S EXPERIENCE AND Total 450 8 ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function Code b. Discipline c. No. of Employees (1) FIRM (2) BRANCH a. Profile Code b. Experience c. Revenue Index Number see below 02 Administrative 47 D07 Dining Halls; Clubs; Restaurants 4 08 CADD Technician 14 7. E02 Educational Facilities; Classrooms 7 12 Civil Engineer 3 4. $500,000 to less than $1 million E03 Electrical Studies and Design 8 16 Construction Manager 12 F03 Fire Protection 6 21 Electrical Engineer 51 4 G01 Garages, Parking Facilities 4 25 Fire Protection Engineer 13 H08 Historical Preservation 4 42 Mechanical Engineer 100 3 H09 Hospital and Medical Facilities 7 48 Project Manager 50 1 H10 Hotels; Motels 5 52 Plumbing/Sanitary Engineer 28 1 101 Industrial Buildings; Manufacturing Plants 5 57 Structural Engineer 2 J01 Judicial and Courtroom Facilities 5 Commissioning Engineer 6 L01 Laboratories; Medical Research Facilities 8 Designer 61 L04 Libraries; Museums; Galleries 3 Sustainable Design Engineers 7 001 Office Buildings; Industrial Parks 8 Information Technology 7 P07 Plumbing and Piping Design 7 Technolo y Design Engineer 6 P12 Power Generation, Transmission, Distribution 8 Transmission & Distr. Engineer 12 S11 Sustainable Design 8 UO3 Utilities Gas and Steam 6 C11 Computer Facilities 0 Total 450 8 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM PROFESSIONAL SERVICES REVENUE INDEX NUMBER FOR LAST 3 YEARS (Insert revenue index number shown at right) 1. Less than $100,000 6. $2 million to less than $5 million 2019 2018 2017 2• $100,00 to less than $250,000 7. $5 million to less than $10 million a. Federal Work 6 6 6 3. $250,000 to less than $500,000 8. $10 million to less than $25 million b. Non -Federal Work 10 10 10 4. $500,000 to less than $1 million 9. $25 million to less than $50 million c. Total Work 10 10 10 5. $1 million to less than $2 million 10. $50 million or greater 12. AUTHORIZED REPRESENTATIVE The foreaoina is a statement of facts. a. SIGNATURE b. DATE August 6, 2020 c. NAME Eli Sherman, PE, President/CEO AUTHORIZED FOR LOCAL REPRODUCTION 51 STANDARD FORM 330 (REV. 8/2016) VAN®ERWEI 52 STANDARD FORM 330 (REV. 8/2016) E� RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E;for each key person) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE William B. Sellon, CPD, LEED AP Principal-in-Charge, Project a. TOTAL b. WITH CURRENT FIRM Manager 24 24 :15. FIRM NAMEAND LOCATION (Cityand,State) R.G. Vanderweil Engineers LLP, Miami, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATEAND DISCIPLINE) A.S., Mechanical Engineering, Massasoit Community Certified Plumbing Designer, 2002 College, 1998 Certified Medical Gas Inspector - NFPA 99C, 1999, 2002 & 2005 18. OTHER PROFESSIONAL QUALIFICATIONS (publications, Organizations, Training, Awards, etc.) William is an Associate Principal and Regional Director with almost 25 years of experience in client and project management for state-of-the-art government and commercial buildings. He has extensive experience in facility master planning as well as cost and schedule management. He is a diligent and dependable leader able to effectively direct teams, coordinate with contractors, and ensure client satisfaction. PROJECTS19. RELEVANT (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED City of Miami, Department of Environmental Resource PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Management, Laboratory Fume Hoods Replacement, Miami, FL 2017 Ongoing a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE M Check if project performed with current firm Role: Principal-in-Charge, Project Manager Replacement of eight existing fume hoods with new Kewaunee Scientific fume hoods within four laboratories along with replacing the existing ductwork. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) U.S. Department of Homeland Security, United States Coast Guard, H Irma Station, Marathon, FL 2019 Ongoing (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE EU Check if project performed with current firm b• Role: Principal-in-Charge, Project Manager Engineering design services for the renovation of the Station Marathon for the U.S. Department of Homeland Security, United States Coast Guard. The site is made up of several buildings, including a two-story administration building, single-story office and storage building, and a boathouse which is a single-story building that houses a repair shop, and storage. The scope of design consists of interior renovation, infrastructure enhancements, fuel farm replacement, exterior lighting replacement and complementary plumbing, as well as mechanical and electrical power work for all buildings on the campus. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) U.S. Department of Veterans Affairs, Health Care Center, Kernersville, NC 2013 2015 C. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE El Check if project performed with current firm Role: Principal-in-Charge, Project Manager New 375,000 sf outpatient health center including surgery, sterile processing department, and laboratory suites. Clinics include behavioral health, women's health, radiology, primary care, audiology and pulmonary medicine. Project includes a police department with readiness training room and weapons storage. The building achieved LEED Gold® certification. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) University of Miami, Medical Campus Master Plan, Miami, FL 2018 12020 d (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE FXI Check if project performed with current firm Role: Principal-in-Charge, Project Manager MEP/FP engineering, master planning, and technology design services for the University of Miami Medical Campus and satellite buildings in South Florida. The master plan will include a high level overview of the major MEP/FP/T infrastructure to support the Universities projected growth over the next 10 years. 53 STANDARD FORM 330 (REV. 8/2016) PAGE 2 E. RESUMES OF • PROPOSED FOR THIS CONTRACT mplete one Section E:for each, key person) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE Mauricio Vargas, PE, LEED AP Senior Mechanical Engineer a. TOTAL b. WITH CURRENT FIRM 16 115 I& FIRM • LOCATION R.G. Vanderweil Engineers LLP, Miami, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) B.S., Mechanical Engineering, Florida International Professional Engineer (Mechanical): FL University, 2004 18. OTHER PROFESSIONAL QUALIFICATIONS (publications, Organizations, Training, Awards, etc.) Mauricio is a Senior Mechanical Engineer with over 15 years of experience in designing chiller plants, government buildings, commercial, and industrial buildings. His experience has provided him with the ability to provide high quality designs, while successfully completing very challenging projects. PROJECTS,19. RELEVANT (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED City of Miami, Department of Environmental Resource PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Management, Laboratory Fume Hoods Replacement, Miami, FL 2017 Ongoing a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE I] Check if project performed with current firm Role: Mechanical Engineer Replacement of eight existing fume hoods with new Kewaunee Scientific fume hoods within four laboratories along with replacing the existing ductwork. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) U.S. Department of Homeland Security, United States Coast 2019 Ongoing Guard, H Irma Station, Marathon, FL (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE a] Check if project performed with current firm b- Role: Mechanical Engineer Engineering design services for the renovation of the Station Marathon for the U.S. Department of Homeland Security, United States Coast Guard. The site is made up of several buildings, including a two-story administration building, single -story office and storage building, and a boathouse which is a single -story building that houses a repair shop, and storage. The scope of design consists of interior renovation, infrastructure enhancements, fuel farm replacement, exterior lighting replacement and complementary plumbing, as well as mechanical and electrical power work for all buildings on the campus. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Indian River State College, Building "O" Chiller Plant Upgrades, 2019 Ongoing Fort Pierce, FL (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE I] Check if project performed with current firm C. Role: Mechanical Engineer The "O" Building Chiller Plant serves various buildings throughout the campus including the new 50,000 sf WorkForce Training Center. The mechanical scope includes replacing existing chiller number 2 and chiller 3, along with the associated cooling towers and primary and condenser water pumps with two new centrifugal chillers. Electrical scope includes replacing the breakers in Main Distribution Panels (MDP) 1 and 2 serving the chillers, cooling towers, and pumps. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Indian River State College, Building Q, Engineering Upgrades, Fort Pierce, FL 2017 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE El Check if project performed with current firm d. Role: Mechanical Engineer The 10,000 sf radio station building includes a new storefront glass and entryway with new lighting. Mechanical systems throughout the building were upgraded to remove the existing exterior chilled water make-up air unit and fan coil units. This provided two new 15 -ton chilled water indoor air handling units with all new supply and return ductwork, VAV terminal boxes with electric reheat and BAS controls. 54 STANDARD FORM 330 (REV. 8/2016) PAGE 2 12. NAME 13. ROLE IN THIS CONTRACT 114. YEARS OF EXPERIENCE rT_I:...,_ a. TOTAL I b. WITH CURRENT FIRM BD+C 48 13 15. FIRM NAME AND LOCATION R.G. Vanderweil Engineers LLP, Miami, FL 16. EDUCATION (DEGREEAND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATEAND DISCIPLINE) B.S., Electrical Engineering, University of Havana, 1972 Professional Engineer (Electrical): FL 18. OTHER PROFESSIONAL QUALIFICATIONS (publications, Organizations, Training, Awards, etc.) Felix is a Senior Electrical Engineer with over 30 years of experience in the field of electrical engineering and lighting design. He specializes in power distribution and controls, technological upgrades and retrofit, audio, telecommunications, security and fire protection as well as energy audits and conservation for government and commercial projects. PROJECTS19. RELEVANT (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED City of Miami, Department of Environmental Resource PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Management, Laboratory Fume Hoods Replacement, Miami, FL 2017 Ongoing a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE D Check if project performed with current firm Role: Electrical Engineer Replacement of eight existing fume hoods with new Kewaunee Scientific fume hoods within four laboratories along with replacing the existing ductwork. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED U.S. Department of Homeland Security, United States Coast PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2019 Ongoing Guard, H Irma Station, Marathon, FL (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm b. Role: Electrical Engineer Engineering design services for the renovation of the Station Marathon for the U.S. Department of Homeland Security, United States Coast Guard. The site is made up of several buildings, including a two-story administration building, single -story office and storage building, and a boathouse which is a single -story building that houses a repair shop, and storage. The scope of design consists of interior renovation, infrastructure enhancements, fuel farm replacement, exterior lighting replacement and complementary plumbing, as well as mechanical and electrical power work for all buildings on the campus. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Indian River State College, Building "O" Chiller Plant Upgrades, PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2019 Ongoing Fort Pierce, FL C. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 0 Check if project performed with current firm Role: Electrical Engineer The "O" Building Chiller Plant serves various buildings throughout the campus including the new 50,000 sf WorkForce Training Center. The mechanical scope includes replacing existing chiller number 2 and chiller 3, along with the associated cooling towers and primary and condenser water pumps with two new centrifugal chillers. Electrical scope includes replacing the breakers in Main Distribution Panels (MDP) 1 and 2 serving the chillers, cooling towers, and pumps. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED University of Miami, Medical Campus Master Plan, Miami, FL PROFESSIONAL SERVICESCONSTRUCTION (If applicable) 2018 12020 d (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Role: Electrical Engineer MEP/FP engineering, master planning, and technology design services for the University of Miami Medical Campus and satellite buildings in South Florida. The master plan will include a high level overview of the major MEP/FP/T infrastructure to support the Universities projected growth over the next 10 years. 55 STANDARD FORM 330 (REV. 8/2016) PAGE 2 E. RESUMES OF. KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE Rashidi Lee Plumbing Engineer a. TOTAL I b. WITH CURRENT FIRM 5 5 1& FIRM NAMEAND LOCATION (City and State) R.G. Vanderweil Engineers LLP, Miami, FL 16. EDUCATION (DEGREEAND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATEAND DISCIPLINE) B.S., Mechanical Engineering, Oriente University, American Society of Mechanical Engineers (ASME) Santiago de Cuba, 2005 18. OTHER PROFESSIONAL QUALIFICATIONS (publications, Organizations, Training, Awards, etc.) Rashidi is a plumbing engineer with 5 years experience in the engineering of plumbing systems for academic and laboratory projects. He oversees projects from begin to end, and plays an integral role in the success of project development through to completion. He has expertise in the sizing, coordination and field investigation of plumbing systems. PROJECTS:19.,� RELEVANT (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED City of Miami, Department of Environmental Resource PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Management, Laboratory Fume Hoods Replacement, Miami, FL 2017 Ongoing a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE D Check if project performed with current firm Role: Plumbing Engineer Replacement of eight existing fume hoods with new Kewaunee Scientific fume hoods within four laboratories along with replacing the existing ductwork. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) U.S. Department of Homeland Security, United States Coast Guard, H Irma Station, Marathon, FL 2019 Ongoing (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE IXI Check if project performed with current firm b• Role: Plumbing Engineer Engineering design services for the renovation of the Station Marathon for the U.S. Department of Homeland Security, United States Coast Guard. The site is made up of several buildings, including a two-story administration building, single -story office and storage building, and a boathouse which is a single -story building that houses a repair shop, and storage. The scope of design consists of interior renovation, infrastructure enhancements, fuel farm replacement, exterior lighting replacement and complementary plumbing, as well as mechanical and electrical power work for all buildings on the campus. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Indian River State College, Building Q, Engineering Upgrades, Fort Pierce, FL 2017 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 0 Check if project performed with current firm C. Role: Plumbing Engineer The 10,000 sf radio station building includes a new storefront glass and entryway with new lighting. Mechanical systems throughout the building were upgraded to remove the existing exterior chilled water make-up air unit and fan coil units. This provided two new 15 -ton chilled water indoor air handling units with all new supply and return ductwork, VAV terminal boxes with electric reheat and BAS controls. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Indian River State College, Workforce Training Center, Fort Pierce, FL 2016 Ongoing d, (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE lZ Check if project performed with current firm Role: Plumbing Engineer A 50,000 gsf two-story academic training building consisting of electrical, plumbing, metal joining, automotive, computer/ electronics, marine, aviation, and diesel laboratories as well as classrooms, administration offices, and conference rooms. The project is pursuing Green Globes® targeting four Globes. 56 STANDARD FORM 330 (REV. 8/2016) PAGE 2 Relevant Project Characteristics New fume hoods • New ducted stainless steel exhaust system with new exhaust fans and new supply ductwork • New chilled water air handling units and VAV terminal boxes with electric re -heat Scope: Mechanical, electrical, plumbing and fire protection engineering design services Size: 10,000 sf Cost: $2,000,000 A $2,000,000 upgrade of existing laboratories and support spaces on the first floor of the City of Miami's DERM Laboratory. Eight fume hoods and their associated mechanical systems were replaced. Labs were retro -fitted with a new ducted stainless steel exhaust system, new exhaust fans and new supply ductwork. The upgrades included new chilled water air handling units and VAV terminal boxes with electric re -heat. Vanderweil provided mechanical, electrical, plumbing, and fire protection engineering. 57 STANDARD FORM 330 (REV. 8/2016) PAGE 3 Relevant Project Characteristics • MEP drawings and specifications suitable for permit, bidding, and construction administration. • Building controls and fuel systems for the fuel farm including piping, controls, and fuel oil tanks to accommodate the new and demolition layouts of the program. • Power to the new HVAC equipment, switchboards, lighting design, and circuiting • New domestic and hot water; sanitary, vent, condensate, and storm systems. Scope: Mechanical, electrical, plumbing and fire protection engineering design services Size: N/A Cost: Confidential Engineering design services for the renovation of the Station Marathon for the U.S. Department of Homeland Security, United States Coast Guard. The site is made up of several buildings, including a two-story administration building, single -story office and storage building, and a boathouse which is a single -story building that houses a repair shop, and storage. The scope of design consists of interior renovation, infrastructure enhancements, fuel farm replacement, exterior lighting replacement and complementary plumbing, as well as mechanical and electrical power work for all buildings on the campus. STANDARD FORM 330 (REV. 8/2016) PAGE 3 This new 375,000 sf Health Care Center and medical office building. • Emergency power generation and UPS systems • Outpatient surgery suite with four procedure rooms • Full pharmacy • Flexible design to allow for changing needs • High -efficiency chilled water plant • Optimized envelope design • Reduced lighting power density incorporating daylighting controls Scope: Mechanical, electrical, plumbing, fire protection, and sustainable design services. Size: 375,000 Cost: $100,000,000 The program includes behavioral health, dialysis, women's health, audiology, dental, pulmonary, cardiology and eye clinics, among several others. There is an outpatient surgery suite with four independent operating rooms, radiology, and nuclear medicine. The program includes a station and systems for the police to be located within the building, and there is a full-service canteen for patient and visitor dining. The building achieved LEED Gold° certification. STANDARD FORM 330 (REV. 8/2016) PAGE 3 26. NAMES OF KEY PERSONNEL (From Section E, Block 12) G. KEY • ON -• 28. EXAMPLE PROJECTS LISTED IN SECTION F 27. ROLE IN THIS (Fill in "Example Project Key" section below before completing table. Place "X" CONTRACT under project key number for participation in same or similar role.) (From Section E, Block 13) 1 2 3 4 5 6 7 8 9 10 William B. Sellon, CPD, LEED AP Principal -in -Charge, Project Manager X X X Mauricio Vargas, PE, LEED AP Senior Mechanical Engineer X X Felix De La Noval, PE, LEED AP BD+C Senior Electrical Engineer X X Rashidi Lee Plumbing Engineer X X PROJECTS:29. EXAMPLE: NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE (FROM SECTION F) 1 City of Miami, DERM Laboratory Fume Hoods Replacement, 6 Miami, FL 2 U.S. Department of Homeland Security, United States Coast 7 Guard, H Irma Station, Marathon, FL 3 U.S. Department of Veterans Affairs, Health Care Center, 8 Kernersville, NC 4 9 5 10 STANDARD FORM 330 (REV. 8/2016) PAGE 4