Loading...
HomeMy WebLinkAboutRodriguez Architects, Inc.7�tv tui i c y Y'�.., 444 fl, TT ,. Amod It T f ifs_ 1f Mk ._. i�. COVER LETTER AND EXECUTIVE SUMMARY 14 August 2020 City Clerk Sunny Isles Beach Government Center 18070 Collins Avenue Sunny Isles Beach, FL 33160 RE: RFQ: 20-07-01 Design Services for CONTINUING PROFESSIONAL CONSULTING SERVICES (CCNA) CITY OF SUNNY ISLES BEACH To Whom it May Concern: Rodriguez Architects, Inc. (RAI) and their consultants wish to express their interest in providing Continuing Professional Consulting Services to the City of Sunny Isles Beach, for the above referenced RFP. RAI was established and incorporated in 1990 and is based in Coral Gables, Florida. We provide a full range of services ncluding, though not limited to: Architecture (New Construction, Renovations, Alterations, and Additions), Interior Design, Space Planning, Code Reviews and Assessments, Review and Interpretation (expert witness), ADAAssessments, Construction Management, Rehabilitation/Re-purposing of Existing Structures, and Facility Planning. We have recently successfully completed many projects to other local governmental agencies via Continuing Services Contracts within the last 5 years and beyond. Agencies with whom we hold current and past Continuing Services contracts are: • CITY OF CORAL GABLES • MIAMI DADE COUNTY PUBLIC SCHOOLS • MIAMI DADE COLLEGE • CITY OF MIAMI • DEPARTMENT OF MILITARY AFFAIRS Complete Basic A/E Design services for these projects have included everything from development of master plan strategies, conceptual design including Facilities List, preliminary schematic site plan (and phasing plans, as required), schematic design, design development, construction documents, bidding, construction administration, and closeout. Our team is uniquely positioned, and clearly understand [he scopes of work that will be required for your projects, to provide design services to the City of Sunny Isles Beach due to of our extensive experience/expertise with this type of continuing contract and because our firm's principals are the experienced design and construction professionals who understand the importance of proper administration in ensuring that all the city's needs are met and that projects are completed within budget and in a timely manner. One element that makes us unique is the wealth of experience and knowledge that we have gathered throughout our 30+ years is held by the Principals, Lourdes Rodriguez, AIA and Miguel A. Rodriguez, FAIA. And although staff might change from time to time, the team leaders and Architects of Record have not. One of our highest praises has come from the Educational entity that we have been working continuously with for the last 30 years, MDCPS, where Mr. Victor Alonso, R.A., ECO Sustainability Officer noted "the firm (RAp is reliable, professional, responsive to the owner's needs and has been a valuable source when researching market conditions, code requirements, and any other question we may have."This is an indicator, that at RAI, we are at the forefront of today's educational pedagogy and materials, construction, and processes. ORFQ 20-07-01 Continuing Professional Consulting Services (CCNA) COVER LETTER AND EXECUTIVE SUMMARY The persons authorized to make representations for the firm are as follows: Lourdes Rodriguez, AIA, President 2121 Ponce de Leon Blvd., Ste, 1010 Coral Gables, FL 305-527-6219 Miguel A. Rodriguez, FAIR, President 2121 Ponce de Leon Blvd., Ste. 101 C Coral Gables, FL 305-527-6219 Most of our current workload are with projects that are currently under construction therefore allowing office staff with ample work hours to start any project requested by the City at any time. Furthermore, we have held this type of contract for over 20 years and are extremely experienced with the type of work, the nimbleness required, and the speed with which most of these projects require. We committo provide the City of Sunny Isles Beach with a timely Performance of the work, as requested and expected by the City. In addition, as we have maintained for the past 30 years, we warrant and confirm that we will maintain in good standing all required licenses, certifications, and permits during the term of the agreement, as required by Federal, State, and Local laws to perform services. Our firm holds certified minority business certificates with most agencies in South Florida (see copies in Section H), and are in the process of applying with the State of Florida. We understand that if we are selected, we are willing to meet any location, budget or tasks ordered. We are eager to work with the City of Sunny Isles Beach and prove our level of experience, professionalism, and worthiness. We look forward to working with you. Thank you for your time and consideration. Since e , odri u zArchitects, Inc. our s JRodrigu A President OP) Services (CCNA) PROJECT APPROACH AND UNDERSTANDING Approach Inclusive participation, identifying needs, and finding the best solution is the RAI approach. At RAI, we understand the importance of an inclusive process, where all stakeholders are involved. This process will provide a starting and continuous dialogue with the City of Sunny Isles Beach to understand each project's character and specifics under this contract. Direct participation by owners and users is crucial to each project's success. Our team has vast experience and the ability to provide thorough Architectural and Engineering Services that, when coupled with the client's active participation, will establish a focused study of needs thatwill help determine the most desirable design options. Our approach promotes a greater understanding of the completed project long before the construction begins. We evaluate every design option in terms of its impact on program, budget and schedule. This process is intended to assist the City of Sunny Isles Beach in making appropriate choices so that the project ultimately satisfies each requirement. Establishing consensus among the diverse groups of participants will be an essential element in the success of any project. Architectural and Engineering Design Services RAI is a full-service architectural firm. Architecture, Interior Design, Estimating, Space Planning and Urban Planning are the foundational services offered by the firm's "in house" personnel. Coordination of MEP, Civil, Structural and other engineering services within RAI projects is a daily practice. Continuing to serve as our client's as a direct link to a full suite of A&E services is a role which we proudly accept. Project Management RAI's project team is organized to deliver prompt, effective response to client requirements. In working with the firm, you will have direct access to firm principals for decision making, benefit from efficient production of all documents, stay informed from conception to construction, and see your goals met. As Principal-in-char�elProject Manaeer, Lourdes Rodrieuez, AIA will be the City of Sunny Isles Beach's primary contact maintaining "hands-on" control of all projects from start to finish. RAI's internal organization relies on close, regular coordination between the Principal -in -charge, Lourdes Rodriguez, AIA, the Quality Assurance Manager, Miguel A. Rodriguez, FAIA, and Senior Project Coordinator, Rosi Cutrone, Assoc. AIA. This will provide three fully informed points of contactto you, all of whom are experienced with this type of contract. On occasions when one is temporarily unavailable, the other will be able to respond quickly ensuring that the client is always able to reach key persons. RAI is organized around client serv ice and therefore retains senior staff that can effectively lead project teams and better collaborate between the client team members. The firm maintains a small and highly efficient technical staff and takes full advantage of current technologies to maximize productivity. As a result, your documents are produced at levels well above the ordinary firm while maintaining continuity to throughout the team. RFQ 20-07-01 Continuing Professional Consulting Services (CCNA) PROJECT APPROACH AND UNDERSTANDING Kickoff Once the project has been authorized/awarded to us, we will schedule a kick-off' meeting with your project representative and any affected consultants. During this meeting, we will: IL • collect all pertinent project information • assess work timelines • record all project criteria • review and clarify project communication protocols • identify any project specific needs • collect all available existing documentation to take back to the office Program Validation To get your project underway, we assess and evaluate the project's program and unique needs. We will focus on better understanding your goals in relation to the opportunities that the project site presents. We then begin to craft a responsive design proposal that addresses each of your requirements. Roadmap Once a project has begun, regularly scheduled project meetings with consultants and clients allow RAI to keep close watch over your project while making sure that the work of all parties is coordinated during development and not after the fact or in the field. RAI's standard procedures (after the program,. budget and schedule are approved) include the following documents: • Preparation of design criteria checklist • Review and coordination of CPTED guidelines applicable to the project and inclusion of those within the design criteria checklist • Review and confirmation of project specific Code requirements • Review and confirmation of the County Design Criteria and specification specific to the project Development f checklists based h U ,� V. , ,Aw•rEPa' Erreyurc — 0.eP0•fM0. 11 ._.._- L Meeting Minutes P. Pd Sitc Visits • eve opment o c ec fists ase on those OEK FIXiMUt/SNA\PAUF•EMFMARY _ requirements enI _ • Preparation of a schedule for phase submittals, including anticipated deliverables at each milestone orr • Preparation of project specific drawing list, specification requirements and checklist Preparation of project specific construction a administration checklist Roadmap /Project Plan These procedures and their respective checklists provide a roadmap for accomplishing project goals and are used by all key personnel, including the City of Sunny Isles Beach's project representative. OgRFQ 20-07-01 ContinuinProfessional Consulting Services (CCNA) RA I A•artFcr+ Erreyurc — 0.eP0•fM0. 11 ._.._- L Sitc Visits • eve opment o c ec fists ase on those OEK FIXiMUt/SNA\PAUF•EMFMARY _ requirements enI _ • Preparation of a schedule for phase submittals, including anticipated deliverables at each milestone orr • Preparation of project specific drawing list, specification requirements and checklist Preparation of project specific construction a administration checklist Roadmap /Project Plan These procedures and their respective checklists provide a roadmap for accomplishing project goals and are used by all key personnel, including the City of Sunny Isles Beach's project representative. OgRFQ 20-07-01 ContinuinProfessional Consulting Services (CCNA) RA I PROJECT APPROACH AND UNDERSTANDING Project Plan At this point, we meet to review these documents with your project representative and confirm their agreement with key milestones, planned deliverables and any other aspect of roadmap. They are immediately distributed to consultants who are required to confirm their understanding of their project roles based on that roadmap. Upon completion of these reviews which we accomplish within a few short days, the roadmap becomes our project plan. We consider this to be a living document which is re -coordinated and adjusted as necessary as issues arise or changes become necessary. Quality Assurance During the progress of the work, quality assurance checks are performed at multiple milestones using guidelines established within the project plan. At certain key milestones, such as at completion of documentation and prior to bid release, dual QA checks are conducted to reduce'misses.' While the project manager and/or principal -in - charge are primarily responsible for progress QA checks, these key checks are duplicated by an alternative project principal. Our quality assurance also carries through to construction phase of the work When we perform construction administration, we take special care to make sure that work is being carried out according to the construction document. Completion Finally, at the completion of the project, after all closeout materials and documentation is delivered, we conduct one final de -briefing with your project representative and ask for their frank review and assessment of our overall project performance. This information is then used firm -wide to fine tune our project procedures and ensure that we always provide the level of service our clients expect from us. Contracting and Sourcing At RAI, we are deeply familiar with many project delivery methods. We are currently involved in projects utilizing the design/bid/build, CM at Risk, and Design/Build forms of contract arrangement. Our extensive background in multiple project types allow us to evaluate your project and make an nformed assessment of the advantages or disadvantages of choosing one project delivery method over the other. Cost Analysis and Schedule Planning At RAI, our database of completed projects which extends through the history of our firm gives us a unique advantage when it comes to cost analysis and schedule planning. We commonly provide cost estimates for our own projects. Additionally, we are often brought in as a consultant to provide cost estimates on feasibility studies where the decision between renovations versus new construction requires supporting data. We also have a strong reputation across our past and current continuing contracts for consistently meeting our client's demands by being on time and under budget. Construction and Contract Administration Building Cost Estimates RAI has maintained a reputation RFQ 20-07-01 among our clients and contractors of being responsive throughout the construction phase. As such, we are known for the quality of our work. To achieve this, we are clear and concise on our specifications, consistent and timely in our support for the contractor during the construction phase. We view construction administration as an extension of architecture, therefore our team members who develop and document our designs, also perform construction administration services. JContinuing Professional Consulting Services (CCNA) PROJECT APPROACH AND UNDERSTANDING Site Analysis and Consultation RAI has frequently been retained as consultant in order to provide a suite of site analysis services. Our experience allows us to offer professional advice on many aspects of site analysis, and our relationship with our engineering consultants further extends the services which we can provide to the City of Sunny Isles Beach. Sustainable Design Sustainable design is among the core values that we at RAI strive for in every project. Our architecture employs passive strategies at every opportunity, our close work with our engineers allow us to make informed decisions on selection the most efficient environmental systems, and our associated LEED credentials are capable of providing you with any sustainable certifications which you may require. Code Analysis Being an authority on the subject of building codes is one of RAI's unique qualifications that sets us apart from many offices. Our founding principal, Mike Rodriguez, FAIA, is a recognized expert with the Florida Building Code, the American with Disabilities Act, the Florida Accessibility Code for Building Construction, the Uniform Federal Accessibility Standards and the Fair Housing Act. His deep knowledge and background of code analysis have positioned him within many teaching engagements on the topic including those in which he teaches the code to building officials and fellow professionals. Project Reviews At RAI, our thorough internal peer review process combined with our expertise is often recognized by others, to the extent that our firm is regularly asked to provide peer review services by other architects, developers and multi -national companies. O RFQ 20-07-01 Continuing Professional Consulting Services (CCNA) CPTED CERTIFICATION ��ite of 191: �ttorrrep 03e4er ® Florida Crime Prevention ;0001� Training Institute Hereby awards this certificate of recognition to Lourdes Rodriguez as a Florida Crime Prevention Through Environmental Design Practitioner for the phirsait of professionatLsm dirough the completion of the 64 Hours In witness thereof, tds diploma has been issued by the Atornev General upon recwmnendation of the faculgp on this 1st Day of April. 20 , PAM BONTM Wornei ,.,eofFlo) A RFQ 20-07-01 ' , ContinuinK Professional Consulting Services (CCNA) RA Superintendent of Schools Alberto M. Carvalho December 17, 2014 Lourdes Rodriguez 2121 Ponce de Leon Blvd. Suite 1010 Coral Gables, Florida 33134 Dear Ms. Rodriguez, Miand•Dade County School Bear/ Pella Tabares Hantrnan, Chair Dr. Lawrence S. Feldman, Vice Chair Dr. Dorothy Bendross-Mindingall Susie V. Castillo Carlos L. Curbelo Dr. Wilbed "Tee" Holloway Dc Marlin Karp Dc Marta Perez Raquel A. Regalado in my years as an administrator I have had several opportunities to interact with architects, contractors, and construction workers through school -related projects. Never, however, has the process been as smooth as it was under the direction of your firm, Rodriguez Architects, Inc. I found our biweekly meetings organized by a checklist that outlined the entire scope of work with timelines and weekly expectations. As a result, I always felt completely aware of what was happening in our school. Additionally, the personnel with whom I worked were pleasant and professional. They answered all my questions and checked in with me daily to ensure a smooth school day. When I expressed concern about the building being without air conditioning, an important part of cleaning during the summer, the team followed through to make sure air conditioning was available to pivotal areas and ultimately, throughout the school according to the delivery date. Your firm's organization and subsequent follow-up alleviated much of the concern associated with construction for an administrator. Please accept this letter as a thank you for your outstanding service and as a recommendation for your services in the future. Sincerely, Dawn M. Baglos Principal Dr. Michael M. Krop Senior High School • 1410 Cotrrltyline Road •Miami, FL 33179 •Dawn M. Baglos, Principal 305-652-6808. 305-G51-8043 (FAX) • mkhs.dadeschools.net Superintendent o, Schools Alberto M. Carvalho March 9, 2018 To Whom It May Concern: Miami -Dade County Schoor Board Perla Tabares Hantman, Chair Dr. Martin Karp, Vice Chair Dr. Dorothy Bendross-Mindingall Susie V Castillo Dr. Lawrence S. Feldman Dr. Steve Gallon Ill Lubby Navarro Dr. Marta Pdrez Mari Tare Rojas Itis my great pleasure to write this letter of recommendation for Rodriguez Architects, INC. I had the pleasure of collaborating with Ms. Lourdes Rodriguez at G.KE. Sabal Palm and now at Mae M. Walters Elementary Schools during the school's GOB Bond Projects. Both schools have dramatic aesthetic and operational upgrades. At our current GOB Project, Lourdes has demonstrated a will to get things done right and meet our needs. She is always attentive to my concerns and ideas. The constant communication keeps up within the timelines of the project and keeping the workflow in an efficient manner. Mae M. Walters Elementary has a new drop-off area, walkways, A/C System, and beautiful classrooms that our children come to. Without reservation, I would recommend Rodriguez Architects INC. for future projects. Lourdes is professional, detailed, and monitors progress to high standards. If you have any questions, feel free to contact met at 305-822466 or milkob(@dadeschools.net Si/n/cerel�y,, Milko Brito, P incipal Mae M. Walters Elementary • 650 W 33 Street •Hialeah, FL 33012 • Milko O. 8rito, Principal 7AG D7f ACA/. 9AF 077 AACG /CAVI .......n11n.n dn.fnnnhnnln nn4 Superintendent of Schools Miami -Dade County School Board Alberto M. Carvalho Paris Tabares Hamman, Chair Dr. Martin Karp, Vice Chair Dr, Dorothy Bendross-Mlndingall Principal Susie V. Castillo Raul Calzadilla, Jr Dr. Lawrence S. Feldman Assistant Principal Dc Steve Gallon Ill Angella Gibson -Carvalho Lubby Navarro Assistant Prindpal Dr. Marta P6rez NO Flamer Mari Tera Rojas March 5, 2018 To Whom it May Concern, Please be advised of my v highest endorsement of Ms. Lourdes Rodriguez, AIA, and her firm Rodriguez Architects, Incorporated. I have had the pleasure to work with them on two projects and have been thoroughly impressed by their professionalism, depth and scope of knowledge, and incredible organizatio al skills in pulling together the many disciplines that comprise our current General Obligation Bond Construction Project of two new buildings for our K- 8 Expansion. Every facet of the work th t they have completed, including the design phase and leading to the initiation of construction, I as been handled in a transparent manner. And so far, this has led to a project that is on time an I on schedule! Her work has and will continue to make a positive contribution to our school community. It is without reservation that I recommend Ms. Lourdes Rodriguez and RAI. Cordially, Mr. Raul Principal Air Base K-8 C Hier for International Education •Raul Calzadilla, Jr., Principal 12829 SW 272 Street, Homes ad, Florida 33032 • 305-258-3676. 305-258-7241 (FAX) • www.airbasek8.net Superintendent of Schools Alberto M. Carvalho May 14, 2019 To Whom It May Concern Re: Lourdes Rodriguez A.I.A. / Rodriguez Architects, Inc. Miami -Dade County School Board Perla Tabares Hantman, Chair Dr. Martin Karp, Vice Chair Dr Dorothy Bendross-Mindingall Susie V. Castillo Dr. Lawrence S. Feldman Dr. Steve Gallon 111 Lubby Navarro Dr. Marta Perez Mari Tore Rojas I have had the opportunity over the past 20 years to work on numerous projects with Lourdes Rodriguez of Rodriguez Associates, Inc in my capacity as Administrative Director of Design and Sustainability. These projects have included a wide range of project types including; additions, remodeling and renovations to existing schools as well as new school facilities. In all instances, Rodriguez Architects, Inc, has proven to be highly professional, interested in the owner's specific needs, and mindful of budgetary and time restraints. During the past six years, we have worked closely with Rodriguez Architects, Inc. on a series of important projects as part of the General Obligation Bond Program. I have found that the firm is reliable, professional, responsive to the owner's need and has been a valuable resource when researching market conditions, code requirements and any other question we may have. I enthusiastically recommend Lourdes Rodriguez A.LA, of Rodriguez Architects, Inc to any entity or individual interested in securing architectural services. ictor Alonso R.A. Administrative Director Design and Sustainability Office of School Facilities Miami -Dade County Public Schools School Board Administration Building • 1450 N. E. 2nd Avenue •Miami, Florida 33132 305-995-1000 • vvww.dadeschools.net CWCap_ital ASSET MANAGEMENT Open Letter of Recommendation for Rodriguez Architects, Inc. It is with great pleasure that I offer this letter of recommendation for Rodriguez Architects, Inc. I had the pleasure of working with Rodriguez Architects, and specifically with Lourdes Rodriguez as project manager, on the renovation of 444 Brickell Avenue in Miami. The 444 Brickell project was complex and had many constraints and challenges, and Rodriguez did an outstanding job in all respects and exceeded our expectations. Rodriguez Architects established strong credibility and confidence early in the process with the 444 Brickell project. Their professionalism, attention to detail, insightful design process, responsive service and timely follow through was most appreciated. Rodriguez developed and delivered a fresh design that exceeded our desired goals but met our timing and budget constraints. With respect to Lourdes Rodriguez, not only is she a talented architect but she is a true pleasure to work with. Ms. Rodriguez is a careful listener and creative thinker, with an impressive ability to develop thoughtful and viable solutions to challenging situations. She provides leadership that is strong, responsible and pro -active yet respectful of the traditional roles of Owner, Architect and General Contractor. I would highly recommend Ms. Rodriguez and Rodriguez Architects, Inc. for any type of architectural or design project that you may be anticipating. They will surely add tremendous value to any project. If there is anything further I can offer on their behalf, please do not hesitate to contact me at (202) 715.9663. Most sincerely, Marilyn Lucas Vice President, Senior Asset Manager 7501 Wisconsin Avenue, Suite 500 West, Bethesda, MD 20814 www.cwcapital.com F .� � STOBS BROS, CONSTRUCTION CO. General Contractors Construction Managers .&, y� 580 N.E. 92nd Street, Miami Shores, Florida 33138 Ph:305-751-1692 * Fax:305-757-6564 Email: Bob@stobs.com C.G.C. 011055 April 28, 2020 To whom it may concern, Re: Professional recommendation and reference Dear Sir / Madam, This letter serves to attest to our experience with Rodriguez Architects Inc. over the past twenty years in a Construction Management at risk relationship. During that time we worked on several projects with both Miami Dade College as well Miami Dade County Public Schools. Our collaboration over the years consistently allowed Lourdes Rodriguez and her team of professionals to help exploit the many benefits of the CM arrangement, including time and cost saving, high quality final product delivery as well as high Owner satisfaction resulting in repeat contracts together. I recommend that you give favorable consideration to including her firm in any upcoming projects you may be planning. Please feel free to contact me if you have any questions. Cell: 786 236 0373 Email: Donovan@stobs.com Project Manager CC: Bob Stobs -President. BUILDING WITH FLORIDA SINCE 1937 VPr Veitla Padron Incorporated General Contractors CGC1524146 Apri129, 2020`" To Whom It May Concern: It has been a pleasure to know and work closely with the principals and staff of Rodriguez Architects Incorporated for over fifteen years. As architects for various Miami -Dade County Public School projects we have had a successful relationship working together completing projects on time and within budget. Our projects have included renovations and additions to several buildings throughout the county. We are presently working together on the Fienberg Fisher K-8 Center GOB Renovation Project. We have found them to be competent, professional, caring and team players throughout the duration of the construction schedule. Their staff is sensitive to the needs of our clients and have made every effort to work around everyone's schedules and provide information in a timely manner. We confidently recommend Rodriguez Architects Incorporated for any construction endeavor and look forward to working with them on future projects. yours, Joseph Perez President Veitia Padron Incorporated 4444 S.W. 71 Avenue, Suite 101b Miami, Florida 33155 •Tel: (305) 669-8575 •Fax: (305) 669-2540 1/ THORNTON April 29, 2020 To Whom it May Concern: I have had the opportunity to work with Rodriguez Architects, Inc., on several projects and varying contract methods, including CM@RISK, and Hard Bids within the last seven years. All projects have been for educational facilities K-12 and currently higher education. I have found that the entire RAI's team is knowledgeable, cooperative, professional, and collaborative. Their experience with educational projects and insight at all levels, starting at the Design phase and continuing through the Construction process, is an asset to the success of the project. I have no reservations in recommending Rodriguez Architects, Inc., and if you have any questions, feel free to contact me at any time. Sincerely, Thornton Construction Company, Inc •il_ Freddy Lopez -Mobilia Project Executive 13290 NW 42 Ave., Opa-Locka, FL 33054 2081 Vista Parkway, Suite 302, West Palm Beach, FL 33411 Telephone: 305.649.1995 •Fax: 305.649.1295 • CGC 058425 • www.thornton-inc.com April 2811, 2020 cunsinuuluxs Lourdes Rodriguez, AIA Principal RODRIGUEZ ARCHITECTS, INC. 2121 Ponce de Leon Blvd., Suite 1010 Coral Gables, FL 33134 (V) 305.448.3373, W. 203 (C) 305.527.6219 REF: Letter of Recommendation To Whom it May Concern: I am pleased to provide this letter of recommendation on behalf of Rodriguez Architects, Inc. (RAI), and Lcurdes Rodriguez, AIA. Over the last 7 years we have collaborated successfully and efficiently on many projects with Miami Dade County Public Schools (MDCPS) and Miami Dade College (MDC). We started our first teaming back in 2013 with 4 projects from the original MDCPS General Obligation Bond. Those projects had very strict schedules and budgets. The process started with a Scope of Work, Budget and Schedule form MDCPS and our collaboration started at the Programming Phase, through final completion. From the beginning, itwas evident that RAI had extensive experience and understanding of educational projects, code requirements and CM @ Risk management and collaboration. During the Pre -construction services, we collaborated with RAI investigating existing conditions, exposing structure (where anticipated) and making material and construction process decisions that would then be incorporated in the Design and Construction Documents. these projects had 12 month schedules and with the cooperation with RAI in expediting Shop Drawing reviews and other paperwork, we were able to complete the projects within 8 months and at the start of the school year, therefore minimizing the disruption to the students and staff. Due to our success in those f rst 4 projects, MDCPS awarded the same team another 3 projects after their completion. To this day, we continue working with RAI on various other projects and agencies, whether Hard Bid or CM, and we have requested that they keep us on their Contractor Bidders list. We enjoy the professional working relationship we have with RAI and highly recommend them to others. Feel free if you need any other information, please do not hesitate to contact me at 239-321-3009, 305-592-0552 x866 (work), or via email at aaraujo@t-and-g.com. Respectfully Submitt ed, MIAMI 8348 NW 5fim Street Doral, Florida 33166 P 305.592.0552 F 305.592,7495 Angel Araujo ORLANDO Principal I Project Executive 8623 Commodity Circle T&G Constructors Orlando, Florida 32819 8348 NW 56'1 Street, Doral FL 33166 P 407.352.4443 C 239-321-3009 1 T 305-592-0552 1 F 305-592-7495 F 407.352.0778 866.352.4443 In1oWl-and-g.com t-and-g.com C00036059 �KDtY{YR�1 � LMC construction group To Whom it may concern: April 27, 2020 CGC059120 I have had the pleasure of working with Rodriguez Architects on several projects using several contract methods including CM@RISK, Design Builds, and Hard Bids. We are presently working on a CM@Risk together for Miami Dade County Public schools where we work closely together and their development drawings and specs from schematic to complete drawings are flawless as they strive to submit clear documents with explicit directions which avoids unforeseen conditions and conflicts. I have worked with them on a design build community center for Southrldge Park as well as several other educational facilities and enjoy their professionalism and commitment to completing projects on time and within budget.. We have no reservations in recommending Rodriguez Architects and if you need any further or more detailed information, do not hesitate in contracting me. Sincerely, Project Executive Link Construction Group GENERAL CONTRACTORS •_ CONSTRUCTION MANAGERS 5350 NW 77T" COURT •DORAL, FLORIDA 33166 • T-305.665.9826 • F-305.665.9851 • LINKCONSTRUCTIONGROUP,NET ARCHITECT - ENGINEER QUALIFICATIONS PART I - CONTRACT -SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1. TITLE AND LOCATION (City and State) Continuing Professional Consulting Services (CCNA) 2. PUBLIC NOTICE DATE 3. SOLICITATION OR PROJECT NUMBER 08/18/2020 20-07-01 B. ARCHITECT -ENGINEER POINT OF CONTACT 4. NAME AND TITLE Lourdes Rodriguez, AIA, Principal 5. NAME OF FIRM Rodriquez Architects, Inc. 448-3373 1(305)448-3374 (Complete this section for the prime contractor and all key subcontractors.) D. ORGANIZATIONAL CHART OF PROPOSED TEAM ❑✓ (Attached) AUTHORIZED FOR LOCALREPRODUCTION STANDARD FORM 330 (REV. 8/2016) (Check) �2 r9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT lol Rodriguez Architects, Inc 2121 Ponce de Leon Boulevard Architect - Prime Ste 1010 Coral Gables, FL 33134 a ✓ ❑ CHECK IF BRANCH OFFICE FEIN: 65-0197336 BUSINESS STRUCTURE: Z✓ Corporation ❑ LLC ❑ Partnership ❑ Sole Proprietorship ❑ Other(spedty): Brill, Rodriguez, Sales & 9360 SW 72 Street Structural Associates, Inc. Suite 262 b, ✓ Miami, FL 33173 ❑ CHECK IF BRANCH OFFICE SDM Consulting Engineers, Inc 135 Almeria Avenue Mechanical Coral Gables, FL 33134 Electrical c. ✓ Plumbing ❑ CHECK IF BRANCH OFFICE d. ❑ CHECK IF BRANCH OFFICE e. ❑ CHECK IF BRANCH OFFICE f. ❑ CHECK IF BRANCH OFFICE D. ORGANIZATIONAL CHART OF PROPOSED TEAM ❑✓ (Attached) AUTHORIZED FOR LOCALREPRODUCTION STANDARD FORM 330 (REV. 8/2016) ORGANIZATIONALCHART ....... . ........ .. _ _...... i b ........ _.._ _ . ....... ..._I........... CORE DESIGN TEAM LEADERSHIP LOURDES RODRIGUEZ, AIA PRINCIPAL -IN -CHARGE, PROJECT ARCHITECT MIGUEL A. RODRIGUEZ, FAIA ANTONIO MORENO QUALITY ASSURANCE MANAGER, PROJECT MANAGER, DESIGNER ADA EXPERT CUAUHTEMOC VALLE PRODUCTION MANAGER I Sam CO%SULI NO LNGINURS SDM CONSULTING ENGINEERS M/E/P ENGINEERS ERNESTO ALOMA, PE PRI NCI PAL -IN -CHARGE JOSE I. MARTINEZ, PE, LEED AP SENIOR MECHANICAL ENGINEER HECTOR J. CASTILLO, PE ELECERICAL ENGINEER CONSULTANT TEAM ROSICUTRONE PROTECT COORDINATOR BRILL RODRICUEZ SALAS &ASSOCIATES, INC. STRUCTUAL ENGINEER ARMANDO SALAS, PE. PRINCIPAL -IN -CHARGE RFQ 20 07-01 O Continuing Professional Consulting Services (CCNA) 11.ji E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) LOURDES RODRIGUEZ, AIA Rodriguez Architects, Inc. 16. EDUCATION (DEGREE AND Principal-in-Charge/Project Architect 1 34 Bachelor of Architecture from the University of Miami, 1983 Associate of Arts/Architecture from Miami -Dade College, 1980 Architecture 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, 14. YEARS EXPERIENCE Coral Gables, FL I /, UUKKtN I KKUFtJJIUNAL KtUIJ I KH I IUN (� IR It qNL UlJ(:IYLINtf Architect #11630 /State of Florida Awards, etc.) American Institute of Architects, Florida Crime Prevention Through Environmental Design Practitioner 19, RELEVANT PROJECTS SCOPE: GOP Renovations, Replacement of HVAC &Interior/Exterior Paint &Finishes, Upgrades to Restrooms & Security/Lighting/Electrical Systems, Replacement of Playground. STANDARD FORM 330 (REV. 7/2018) PAGE 2 (1) TITLE AND LOCATION (Cityand State) (2) YEAR COMPLETED Miami Southridge Senior High School Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2017 2017 a. (3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE �✓ Check if project performed with current firm ROLE: Principal-in-Charge/Project Architect SIZE: 334,000 SF COST: $4,993,926.00 SCOPE: GOB Renovations, Replacement of HVAC/Clg. Tile/Resilient Tile, Upgrades to Electrical & Fire Alarm Systems, Conversion of 3 -Classrooms to ]-Prep Lab, Remodel of Stem Lab, Paint & Re -roofing of Exterior/Interior (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Scoff Lake Elementary Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (Ifapplicable) 2018 I 2018 h (3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE Z Check If project performed with current firm ROLE: Principal-in-Charge/Project Architect SIZE: Entire facility Renovation COST: $3,7509000.00 SCOPE: GOP Project Year 3: Renovations/RemodelinglNew 10 Classroom Prototype Building (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED MDC Homestead Campus Homestead, FL PROFESSIONAL SERVICES CONSTRUCTION (Ifapplicable) 2015 2016 C. (3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Principal4ri-Charge/Project Architect SIZE: Entire Campus COST: $3,250,000.00 SCOPE: Re -Roofing, Waterproofing, Bldg. A HVAC Replacement, Painting, Misc. Renovations/Remodeling (1) TITLE AND LOCATION (city and State) (2) YEAR COMPLETED 444 Brickell Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (Ifapplicable) 2012 2012 d (3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE Z Check if project performed with current firm ROLE: Principal-in-Charge/Project Architect SIZE: Entire Building COST: $2,813,498.00 SCOPE: Railing Replacement, Facade Renovation/Painting Exterior, New Storefront, New Entrance Canopy, Replace Entry Stairs, Upgrade Restrooms to comply with ADA, Structural Repairs/Renovations, HVAC Rework (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Mae Walters Elementary Hialeah, FL PROFESSIONAL SERVICES 1 CONSTRUCTION (If applicable) 2018 2018 e. (3) BRIEF DESCRIPTION (Briefscope, size., cost, etc.) AND SPECIFIC ROLE Z Check if project performed with current firm ROLE: Principal-in-Charge/Project Architect SIZE: Entire facility COST: $3,927,411.00 SCOPE: GOP Renovations, Replacement of HVAC &Interior/Exterior Paint &Finishes, Upgrades to Restrooms & Security/Lighting/Electrical Systems, Replacement of Playground. STANDARD FORM 330 (REV. 7/2018) PAGE 2 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE a TOTAL h. WITH CURRENT FIRM MIGUEL A. RODRIGUEZ, FAIA Principal, Quality Assurance Manager 37 1 30 15. FIRM NAME AND LOCATION (City and S Rodriguez Architects, Inc 17. CURRENT Coral Gables, FL (STATE AND DISCIPLINE) Bachelor of Architecture from the University of Miami, 1981 Architect: Florida - #AR10099, South Carolina - #05071, Associate of Arts/Architecture from Miami -Dade College, 1978 Georgia - #RA011485, Alabama - #5984 NCARB Certification -#46548 Architecture etc.) Chair &Board Member -State of Florida, Board of Architecture &Interior Design 2012-2019 19. RELEVANT PROJECTS ROLE: Principal -in -Charge SIZE: 9,500 SF COST: $1989660.00 SCOPE: Quality Assurance Review of Construction Documents, Specifi cations &Probable Cost Estimate. STANDARD FORM 330 (REV. 7/2018) PAGE 2 (1) TITLE AND LOCATION (Cpy and State) (2) YEAR COMPLETED Tamel Properties Miami Gardens, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2012 2012 a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE FV]Check if project performed with current firm ROLE: Principal -in -Charge SIZE: 27,000 SF addition on exist. 68,000 SF plant COST: $5,688,000.00 SCOPE: Major Renovation/Remodeling, Addition & Re -Roofing to an existing manufacturing plant while allowing Owner to continue operations (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED University of Miami CIMAS Building Key Biscayne, FL PROFESSIONAL SERVICES CONSTRUCTION (Ifapplicable) 2017 2018 b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Principal, Quality Control Manager SIZE: Entire Facility COST: $250,000.00 SCOPE: Upgrade Restrooms to comply with ADA, Replace existing windows with impact -rated windows, Remove & Replace storefront finishes (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED 444 Brickell Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (/(applicable) 2012 2012 C, (3) BRIEF DESCRIPTION (Bdefscope, size, cost, etc.) AND SPECIFIC ROLE ❑_ Check if project performed with current firm ROLE: Principal-in-Charge/Project Architect SIZE: Entire Building COST: $2,813,498.00 SCOPE: Railing Replacement, Facade Renovation/Painting Exterior, New Storefront, New Entrance Canopy, Replace Entry Stairs, Upgrade Restrooms to comply with ADA, Structural Repairs/Renovations, HVAC Rework (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED MDC Homestead Campus Homestead, FL PROFESSIONAL SERVICES CONSTRUCTION (Ifapplicable) 2015 2016 d (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ZCheck if project performed with current firm ROLE: Principal-in-Charge/Project Architect SIZE: Entire Campus COST: $3,2501000.00 SCOPE: Re -Roofing, Waterproofing, Bldg. A HVAC Replacement, Painting, Misc. Renovations/Remodeling (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Belafonte - Tacolcy Park Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (Ifapplicable) 2015 2016 c (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑✓ Check if project performed with current firm ROLE: Principal -in -Charge SIZE: 9,500 SF COST: $1989660.00 SCOPE: Quality Assurance Review of Construction Documents, Specifi cations &Probable Cost Estimate. STANDARD FORM 330 (REV. 7/2018) PAGE 2 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT Scott Lake Elementary School Miami, FL PROFESSIONAL SERVICES (Complete one Section E for each key person.) 2018 2018 12. NAME (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Z Check if project performed with current firm 13. ROLE IN THIS CONTRACT SCOPE: GOP Renovations/Additions, New Classroom Building/ Covered Walkways/ Parent Drop-off, upgrades to 14. YEARS EXPERIENCE ANTONIO MORENO Senior Project Manager/Designer Palm Springs North Elementary Miami, FL a. TOTAL 33 CONSTRUCTION (If applicable) h. WITH CURRENT FIRM 2 15. FIRM NAME AND LOCATION (City and Slate) 2018 2018 I b (3) BRIEF DESCRIPTION (Bdefscope, size, cost, etc.) AND SPECIFIC ROLE Z Check If project performed with current firm Rodriguez Architects, Inc SCOPE: GOP Renovations/Addition, New Building/Covered Walkways/PE Shelter/Basketball Courts, Misc. Upgrades (1) TITLE AND LOCATION (City and State) Coral Gables, FL Bachelor of Architecture from the University of Florida, 1987 Associate of Arts/Architecture from Miami -Dade College 1985 Architecture 19. RELEVANT PROJECTS SCOPE: GOP (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Restroom Renovations, ADA improvements, New Covered walkways, Firm Scott Lake Elementary School Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (lfapplicable) 2018 2018 a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Z Check if project performed with current firm ROLE: Project Manager SIZE: Entire Facility Renovation COST: $3,375,000.00 SCOPE: GOP Renovations/Additions, New Classroom Building/ Covered Walkways/ Parent Drop-off, upgrades to existing Classrooms/ Bathrooms, Renovations to interior/Exterior of existing buildings, New HVAC & Hood for Kitchen (1) TITLE AND LOCATION (City and Slate) (2) YEAR COMPLETED Palm Springs North Elementary Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2018 2018 I b (3) BRIEF DESCRIPTION (Bdefscope, size, cost, etc.) AND SPECIFIC ROLE Z Check If project performed with current firm ROLE: Project Manager SIZE: 15,000 SF. COST: $2,800,000.00 SCOPE: GOP Renovations/Addition, New Building/Covered Walkways/PE Shelter/Basketball Courts, Misc. Upgrades (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Coral Park Elementary School Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (lfapplicable) O (3) BRIEF DESCRIPTION (Brief scope; size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Project Manager SIZE: 16,000 SF COST: $3,600,000.00 SCOPE: GOP Renovations/Addition, New Building/Covered Walkways/PE Shelter/Drop-ff Area, Upgrades to Parking Site/Misc. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Auburdale Elementary School Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (lfapplicable) 2015 I 2016 d (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑ Check if project performed with current firm ROLE: Project Manager SIZE: 28,000 SF COST: $1001000.00 SCOPE:GOP Renovations/ Upgrades. Window Replacement, Restroom Renovations, ADA Improvements, New HVAC in Classrooms (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Miami Springs Senior High School Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2011 1 2012 Be (3) BRIEF DESCRIPTION (Brief scope, she, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm ROLE: Project Manager SIZE: 33,000 SF COST: $2,000,000.00 SCOPE: GOP Renovations/ Upgrades, Restroom Renovations, ADA improvements, New Covered walkways, Firm Alarm System Upgrades STANDARD FORM 330 (REV. 7/2018) PAGE 2 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE a. TOTAL b. WITH CURRENT FIRM ROSI CUTRONE Project Coordinator 7 2 15. FIRM NAME AND LOCATION (City and State) Rodriguez Architects, Inc. Coral Gables, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) BA in Architecture, Florida Atlantic University, 2017 MS in Const. Management, Florida Int. University, 2011 BA in Studies of Architecture, Florida Int, University, 2009 AA in Architecture, Miami Dade College, 2007 18. OTHER PROFS; Associate AIA 19. RELEVANT PROJECTS SCOPE: HVAC Replacement & Re -Roofing STANDARD FORM 330 (REV. 8!2016) PAGE 2 (1)TITLE AND LOCATION (City and State) (2)YEAR COMPLETED South Miami Middle School Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (Ifapplicable) 2017 I 2019 d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Z Check if project performed with current firm ROLE: Production Manager SIZE: COST: $2,724,070.00 SCOPE: Remodeling/Renovation to replace existing windows, HVAC units, restrooms; and painting (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Carrie Meek K-8 Center Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (Ifapplicable) 2018 2019 I b (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Z Check if project performed with current firm ROLE: Production Manager SIZE: 4,600 SF COST: $13524,005.00 SCOPE: New four classroom addition with covered walkway connection (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Fienberg-Fisher K-8 Center Miami Beach, FL PROFESSIONAL SERVICES CONSTRUCTION (Ifapplicable) 2018 2019 I C. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Z Check if project performed with current firm ROLE: Project Coordinator SIZE: Entire Facility COST: $1,850,000.00 SCOPE: Replacement of Fire Alarm/ Water Coolers, NEW AC, Finishes, Toilet Rooms, Repaint Exterior (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Coral Springs Middle School Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (if app licable) 2019 I N/A d (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Z Check if project performed with current firm ROLE: Project Coordinator SIZE: Entire Facility COST: $9,345,659.00 SCOPE: HVAC Replacement, Upgrades to Facility, Re -roofing. (1) TITLE AND LOCATION (Cityand State) (2) YEAR COMPLETED Deerfield Park Elementary School Oakland Park, FL PROFESSIONAL SERVICES CONSTRUCTION (Ifapplicable) 2018 N/A e. (3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE Z Check if project performed with current firm ROLE: Project Coordinator SIZE: Entire Facility COST: $53081,727.00 SCOPE: HVAC Replacement & Re -Roofing STANDARD FORM 330 (REV. 8!2016) PAGE 2 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) CUAUHTEMOC VALLE I Production Manager I 14 15, FIRM NAME AND LOCATION (City and State) Rodriguez Architects, Inc. 16. EDUCATION (DEGREE AND BA in Architecture, Florida International University, 2005 16. OTHER 19. RELEVANT PROJECTS Ii:1��:11aC[tl� Coral Gables, FL 9TE AND DISCIPLINE) STANDARD FORM 330 (REV. 8/2016) PAGE 2 (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Carrie Meek K-8 Center Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (Ifapplicable) 2018 I 2019 a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Z Check if project performed with Current firm ROLE: Production Manager SIZE: 4,600 SF COST: $1,524,005.00 SCOPE: New four classroom addition with covered walkway connection (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED South Miami Middle School Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (Ifapplicable) 2017 2019 b (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Z Check if project performed with current firm ROLE: Production Manager SIZE: 30,000 SF COST: $21724,070.00 SCOPE: Remodeling/Renovation to replace existing windows, HVAC units, restrooms; and painting (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Nautilis Middle School Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (Ifapplicable) 2013 2014 I C. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm ROLE: Production Manager SIZE: -1,200 SF COST: Under $2M SCOPE: Classroom to (Prep lab conversion, repainting, renovations, electrical upgrades, interior paint. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Shenandoah Middle School Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (Ifapplicable) 2013 2014 d (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ❑ Check if project performed with current firm ROLE: Production Manager SIZE: -1,200 SF COST: Under $2M SCOPE: Classroom to (Prep lab conversion, repainting, renovations, electrical upgrades, interior paint. (1) TITLE AND LOCATION (Cityand State) 1 (2) YEAR COMPLETED Kinloch Park Middle School Oakland Park, FL PROFESSIONAL SERVICES I CONSTRUCTION (Ifapplicable) 2013 2014 e. (3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm ROLE: Production Manager SIZE: -1,200 SF COST: Under $2M SCOPE: Classroom to ]Prep lab conversion, repainting, renovations, electrical upgrades, interior paint. STANDARD FORM 330 (REV. 8/2016) PAGE 2 12. NAME Hector J. Castillo, P.E. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each Ivey person.) ROLE IN THIS CONTRACT Senior Electrical Engineer 15. FIRM NAME AND LOCATION (Cityand State) SDM Consulting Engineers, Inc. - Coral Gables, Florida (Degree antl Special'zationJ Monmouth University BSEE / Electronics Engineering 14. YtAKJ tXYtKItNl:t 27 1 27 1 /. UUHKtN I YKUhtSJIUNAL Ktti1J I KA I IUN (Jtate antl UISGpllne/ State of Florida I Electrical Engineering 19. RELEVANT PROJECTS STANDARD FORM 330 (REV. 8/2016) PAGE 2 (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Miami Dade College Wolfson Campus PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Building 7000 Parking Garage Remodeling/Renovation - Miami, FL Est. 2020 Est. 2020 a. (3) BRIEF DESCRIPTION (Bdefscope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: A new multi -use parking garage facility inclusive of spaces for offices/street-front retail/restaurant facilities. Size: A 11 -floor level parking garage with approximately 2,260 parking spaces. Cost: $3.64 Million O (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Brickell World Plaza - Parking Garage PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Miami, FL Est. 2020 Est. 2020 b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Extensive remodeling and renovation of the parking garage in order to extend the service life of the facility. Size: A 12 -level, -300,000 sf garage with approximately 600 parking spaces. Cost: $35 Million (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED GSA West Lot Multi -Use Facility - Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) LEED Gold Certification 2012 2012 C. (3) BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: A multi -use parking garage facility which serves as parking for the new Children's Courthouse Building. Size: A 10 -level, 320,127 sf parking garage for 810 parking spaces on 6 levels, office & storage space, and retail space. Cost: $14.3 Million (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED River Oaks Condominium and Parking Garage PROFESSIONAL SERVICES CONSTRUCTION (Ifapplicable) Miami, FL © 2009 2009 d (3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Design/Construction of a 22 -story, 99 -unit condominium building with parking structure. Size: 240,000 sf facility with a 7 -level parking garage to host 348 parking spaces. Cost: $49 Million (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED South County Courthouse Expansion and Parking Garage PROFESSIONAL SERVICES CONSTRUCTION (lfapplicable) Delray Beach, FL © 2009 2009 B (3) BRIEF DESCRIPTION (Bfiefscepe, size, cost, etc.) AND SPECIFIC ROLE ❑ Check if project performed with current firm Description: The addition/renovation of the existing Courthouse facility and the addition of a new parking garage. Size: A 3 -level, 100,000 sf, 369 -car parking garage Cost: $18.1 Million STANDARD FORM 330 (REV. 8/2016) PAGE 2 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 113. ROLE IN THIS CONTRACT 1 14. YEARS EXPERIENCE Jose I. Martinez, P.E., LEED AP Senior Mechanical Engineer 15. FIRM NAME AND LOCATION (City and Stale) SDM Consulting Engineers, Inc. - Coral Gables, Florida 16. EDUCATION (Degree and Florida International University BSME / Mechanical Engineering 18. OTHER zs1 26 I /. UUKKtry I F•KUrta�lurvAL Ktlil� I KA I IVry (J(are ono UISCIpIIneJ State of Florida /Mechanical Engineering GBCI LEED Accredited Professional; ASHRAE Member; SAVE International Member 19. RELEVANT PROJECTS STANDARD FORM 330 (REV. 8/2016) PAGE 2 (i) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Miami Dade College Wolfson Campus PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Building 7000 Parking Garage Remodeling/Renovation - Miami, FL Est. 2020 Est. 2020 I a. (3) BRIEF DESCRIPTION (Brief scope, size, cast, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: A new multi -use parking garage facility inclusive of spaces for offices/street-front retail/restaurant facilities. Size: A 11 -floor level parking garage with approximately 2,260 parking spaces. Cost: $3.64 Million (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Brickell World Plaza - Parking Garage PROFESSIONAL SERVICES CONSTRUCTION (if applicable) Miami, FL Est. 2020 Est. 2020 b (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Extensive remodeling and renovation of the parking garage in order to extend the service life of the facility. Size: A 12 -level, —300,000 sf garage with approximately 600 parking spaces. Cost: $35 Million (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED GSA West Lot Multi -Use Facility - Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (it applicable) LEED Gold Certification © 2012 2012 C. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check If project performed with current firm Description: A multi -use parking garage facility which serves as parking for the new Children's Courthouse Building, Size: A 10 -level, 320,127 sf parking garage for 810 parking spaces on 6 levels, office & storage space, and retail space. Cost: $14.3 Million (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED River Oaks Condominium and Parking Garage PROFESSIONAL SERVICES CONSTRUCTION (If app Miami, FL © 2009 I 2009 cl (3) BRIEF DESCRIPTION (Brief scope, size, cost,. etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Design/Construction of a 22 -story, 99 -unit condominium building with parking structure. Size: 240,000 sf facility with a 7 -level parking garage to host 348 parking spaces. Cost: $49 Million D (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED South County Courthouse Expansion and Parking Garage PROFESSIONAL SERVICES CONSTRUCTION (lfapplicable) Delray Beach, FL 2009 2009 e. (3) BRIEF DESCRIPTION (Brief scope, size, cost etc.) AND SPECIFIC ROLE E]Check if project performed with current firm Description: The addition/renovation of the existing Courthouse facility and the addition of a new parking garage. Size: A 3 -level, 100,000 sf, 369 -car parking garage Cost: $18.1 Million STANDARD FORM 330 (REV. 8/2016) PAGE 2 2. NAME Ernesto Aloma, P.E. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 15. FIRM NAME AND LOCATION (City and State) SDM Consulting Engineers, Inc. - Coral Gables, Florida 16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Florida International University BSEE / Electrical Engineering State of Florida /Electrical Engineering Training, Awards, etc.) IEEE NFPA D 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Miami Dade College Wolfson Campus TOT29 PROFESSIONAL SERVICES WITH CU FIRM M/E Engineering Project Manager la. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: A new multi -use parking garage facility inclusive of spaces for offices/street-front retail/restaurant facilities. Ib. 2R9 15. FIRM NAME AND LOCATION (City and State) SDM Consulting Engineers, Inc. - Coral Gables, Florida 16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Florida International University BSEE / Electrical Engineering State of Florida /Electrical Engineering Training, Awards, etc.) IEEE NFPA D 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City STANDARD FORM 330 (REV. 8/2016) PAGE 2 and State) (2) YEAR COMPLETED Miami Dade College Wolfson Campus PROFESSIONAL SERVICES CONSTRUCTIOst.N (Ifapplicable) Building 7000 Parking Garage Remodeling/Renovation - Miami, FL Est. 2020 E 2020 a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: A new multi -use parking garage facility inclusive of spaces for offices/street-front retail/restaurant facilities. Size: A 11 -floor level parking garage with approximately 2,260 parking spaces. Cost: $3.64 Million (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Brickell World Plaza - Parking Garage PROFESSIONAL SERVICES CONSTRUCTION (Ifapplicable) Miami, FL Est. 2020 Est. 2020 b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC. ROLE Check if project performed with current firm Description: Extensive remodeling and renovation of the parking garage in order to extend the service life of the facility. Size: A 12 -level, —300,000 sf garage with approximately 600 parking spaces. Cost: $35 Million 11 (1) TITLE AND LOCATION (City and State) Me (2) YEAR COMPLETED GSA West Lot Multi -Use Facility - Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) LEED Gold Certification © 2012 2012 C, (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE F-1Check if project performed with current firm Description: A multi -use parking garage facility which serves as parking for the new Children's Courthouse Building, Size: A 10 -level, 320,127 sf parking garage for 810 parking spaces on 6 levels, office & storage space, and retail space. Cost: $14.3 Million (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED River Oaks Condominium and Parking Garage PROFESSIONAL SERVICES CONSTRUCTION (if applicable) Miami, FL © 2009 2009 d (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check If project performed with current firm Description: Design/Construction of a 22 -story, 99 -unit condominium building with parking structure. Size: 240,000 sf facility with a 7 -level parking garage to host 348 parking spaces. Cost: $49 Million (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED South County Courthouse Expansion and Parking Garage PROFESSIONAL SERVICES CONSTRUCTION (Ifapplicable) Delray Beach, FL © 2009 2009 e (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: The addition/renovation of the existing Courthouse facility and the addition of a new parking garage. Size: A 3 -level, 100,000 sf, 369 -car parking garage Cost: $18.1 Million 13 STANDARD FORM 330 (REV. 8/2016) PAGE 2 Armando Sales, PE, E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) Structural Engineer 15. FIRM NAME AND LOCATION (City and State) Brill Rodriguez Salas & Associates, Inc., Miami, FL. 16. EDUCATION (DEGREE AND SPECIALIZATION) 14. YEARS EXPERIENCE 421 29 BSCE University of Havana, Cuba, Civil EIng inear ing,1977 State of Florida Professional Engineer #38007 PROFESSIONAL SERVICES I State of Florida Licensed Inspector #0978 tB. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Mr. Solas has diversified experience in Structural Engineering and Structural Design, Investigation, and Inspection services. Highly skilled in project management and feasibility studies of existing structures. 19. RELEVANT PROJECTS STANDARD FORM 330 (REV. 7/2018) PAGE 2 (1) TITLE AND LOCATION (City antl State) (2) YEAR COMPLETED University of Miami, Continuing Contract, Coral Gables, FL. PROFESSIONAL SERVICES I CONSTRUCTION (Ifapplicable) 2020 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm a. Hired as consultants under an on-going contract to maintain, repair, and renovate every building on campus including parking garages. To perform structural design, prepare structural plans and specs for new facilities, and inspections. (1) TITLE AND LOCATION (City and State) 1(2) YEAR COMPLETED Riviera Country Club - Clubhouse & Fitness Center, Coral Gables, FL. PROFESSIONAL SERVICES CONSTRUCTION (Ifapplicable) 2016 2018 I f) (3) BRIEF DESCRIPTION (Bnefscope, size, cast, etc.) AND SPECIFIC ROLE Check if project performed with current firm Brill Rodriguez Sales & Associates, Inc., were hired to perform structural design services and a Structural Peer Review for the Riviera Country Club at the Pump House, Toilet Shelter, Clubhouse, and the Fitness Center facilities. (1) TITLE AND LOCATION (Cityand State) (2) YEAR COMPLETED MDCPS, Curtis Park Pool and Fieldhouse, Miami, FL, PROFESSIONAL SERVICES CONSTRUCTION (Ifapplicable) 2016 2018 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm C. Structural Engineering Services including design, for a new pool facility replacement with adjacent baseball field, and restroom building. A budget construction cost of approximately $1.6M. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Coral Way Community Center, Miami, FL, PROFESSIONAL SERVICES CONSTRUCTION (Ifapplicable) 2014 2014 d (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Structural Engineering Services for the remodeling of an existing firehouse into a community center. A budget construction cost of approximately, $680,000.00. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED University of Miami, Student Activities Center, Coral Gables, FL, PROFESSIONAL SERVICES CONSTRUCTION (Ifapplicable) 2013 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm e. Structural Engineering Services for the new construction, renovation, expansion of existing University Center, and redesign of main UC Patio. A project size of approximately 119,368 SF and a budget construction cost of $20M. STANDARD FORM 330 (REV. 7/2018) PAGE 2 F. EXAMPLE PROJECTS WHI( QUALIFICATI, /Present as many projects as request Complete one or 10 projects, if not specified. NUMBER 1 21. Lt ANU LOCA I IUN (L'rty antl State/ 22. YEAR COMPLETED University of Miami, Coral Gables, FL PROFESSIONAL SERVICES 1CONSTRUCTION (If applicable) Master Agreement for Campus Planning & Construction —various projects 1998- 2007, 2016-2021 11998-20070 2016-2021 23. PROJECT OWNER'S INFORMATION YXUJtUI UWNttI �. YUINI OF UUN AUI NAMt University of Miami David Shewairy 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, Projects entailed exterior and interior renovations at various buildings located on the university's main campus at Coral Gables as well as remote campuses such as the Koubek Center, Knight Center and RSMAS around Miami Dade County. Performed under a Master Agreement under which individual service orders are written. Assignments included interior tenant build -outs for academic and administrative units of the University, restroom renovations, accessibility improvements, classroom renovation and technology conversions and mise studies. Among sample projects are: • Merrick Building 2"a & 3'a Floor Restroom renovations — 2005/2007 • Memorial Classroom Building Public Restroom renovations - 2006 • RSMAS Marine Science Center Office build -out— 2004 • Ashe Building 5111 & 71h Floor Office Renovations — 2005 • Koubek Center Classroom Building Renovations — 2000 • Information Technology Offices — Merrick 5,6,7'h Floors- 1999 • Allen Hall - School of Continuing Studies Office Renovations -1998 • C -STAR Campus • RSMAS Campus -2018 305-284-1351 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT STANDARD FORM 330 I6/2004 111 FIRM NAME 121 FIRM LOCATION (City and State) (3) ROLE a. Rodriguez Architects, Inc Coral Gables, Florida Prime -Architect (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and Sterol (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) HOLE e- (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. 1 PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 pro/ects, if not specified. 2 Complete one Section F for each project./ 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Miami -Dade County Public Schools, Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (/f app icable) A/E Project Consultant Continuing Contract (2012=2022) 2012-2022 2012-2022 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Miami -Dade County Public Schools Victor Alonso 305-9954502 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope., size, and cost) Provide Basic A/E Services at Various Miami -Dade School Locations. The projects included herein is only a small sampling of projects completed: Sabal Palm Elementary Eneida M. Hartner Elementary Window & door replacement, HVAC replacement, &Updated electrical and HVAC replacement. other renovations. w Cost: $1,325,214 Cost: $1,819,521 Year Completed: 2017 Year Completed: 2014 Dr. Michael Krop Senior High Highland Oaks Elementary - Window & door replacement, HVAC replacement, other renovations. Cost: $1,612,235 Year Completed: 2015 Highland Oaks Middle Cooling tower replacement, toilet room upgrades, and other renovations. Cost: $908,436 Year Completed: 2016 - Miami Springs Elementary Window & door replacement, HVAC replacement, & other renovations. Cost: $1,195,523 Was Year Completed: 2015 Coral Gables Elementary Window & door replacement, HVAC replacement, & other renovations. Updated electrical and HVAC systems. Cost: $1,153,815 Year Completed: 2014 iPrep Projects Conversion of 2/3 classrooms into iPrep Math labs U1 Miami -Dade County (11 total). Cost Range: $140,000 - $180,000 Year Completed: 2014 Palm Springs North New 10 classroom building addition with connecting covered walkways. Cost: $2,800.00 Year Completed: 2018 lack Gordon Elementary School Complete HVAC-AHU replacement in main building well as general repairs and upgrades. Cost: $2,334,717.48 Year Completed: 2017 Cost: $1,896,546 Year Completed: 2017 t _ I_. _ � Other projects have included: HVAC replacement, cooling tower replacement, Fire Alarm replacement, concrete repairs, covered walkways, and other mise. repairs and upgrades 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT STANDARD FORM 330 (6l2004 (1) FIRM NAME 121 FIRM LOCATION (City and State) 131 ROLE a Rodriguez Architects, Inc Coral Gables, Florida Principal -in -Charge - Architect of Record (1) FIRM NAME (2) FIRM LOCATION /City and State) (3) ROLE b. Brill, Rodriguez, Salas & Associates, Inc Miami, Florida Structural Engineer (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE co (1) FIRM NAME (2) FIRM LOCATION (City end State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State)(31 ROLE f. ) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. 3 Complete one Section F for each project,/ Ti. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Miami -Dade College, Miami, FL PROFESSIONAL SERVICES 1CONSTRUCTION (lf applicable) A/E Project Consultant Continuing Contract (2001-2004; 2015-2020) 2001 —2004, 2015-2020 2001-2004, 2015-2020 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Miami -Dade College Bryan Whitefield 305-237.0522 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT Include scope, rze, and cost) Provide Basic A/E Services at Various Campus Locations. The projects included herein is only a small sampling of projects completed: Kendall Campus — ESL Lab Renovation Downtown Campus — Honors College Classrooms / Involved the renovation and remodeling of existing Culinary Arts Department. Computer Labs. Involved the renovation of classrooms and dining Cost: $250,000 Year: 2003 Medical Campus —Nursing Lab Renovation Involved the renovation and remodeling of the Medical Department's Nursing Labs and Stations. Cost: $500,000 Year: 2003 Downtown Campus — Buildine 3000 Exterior Cladding Renovation Involved the renovation of the Exterior Cladding of the building due to severe damage. Cost: $200,000 Year: 2003 Downtown Camnus — NWSA Paint & Wateroroofine Involved the Exterior Cleaning, Painting, and Waterproofing of the New World School of The Arts. Cost: $290,000 Year: 2004 areas in the Culinary Arts and Honors Departments of the College. - Cost. $150,000/$135,000 Year: 2003 Downtown Campus — Dental Hygiene Multi -Purpose Computer Lab Involved the renovation and remodeling of the Dental Hygiene Deparunent's Multi -Purpose Computer Lab. Cost: $250,000 Year: 2003 _I Homestead Campus — Re -roofing, Re -roof, new envelope waterproofing, exterior painting, and mist. remodeling and renovations Cost: $3,250,000 Sd Year: 2015 .[ I NWSAFeasibility Repo rt Performed assessment condition observation report, recommendatory and estimate. 1e Year: 2020 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (11 FIRM NAME (2) FIRM LOCATION /City and State/ ( STANDARD FORM 330 (61200 3) ROLE Lourdes Rodriguez, AIA, Principal Miami, Florida Principal -in -Charge, Architect of Record a while at Architelmics, Inc. (2001-2004) (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b, Rodriguez Architects, Inc Coral Gables, Florida Principal -in -Charge, Architect of Record (2015-2020) (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C, Brill, Rodriguez, Salas & Associates, Inc Miami, Florida Structural Engineer (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d SDM Consulting Engineers, Inc. Coral Gables, Florida M/E/P Engineer (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. 4) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SLV. LAAWLI nI IAI Wir:ATIn IUC Gr1R THIO rr1NITRAr:T I NUMBER (Present as many projects as The School Board of Broward County, Ft. Lauderdale, FL A/E Proiect Consultant Continuing Contract (1997-2002) or if not specified. 23. PROJECT OWNER'S INFORMATION 22. YEAR COMPLETED iIONAL SERVICES CONSTRUCTION (If applicable) 1997-2002 1 1997-2002 e. PROJECT OWNER 2,800 SF (Buildings) / 11 Acres (Playfields) Year: b. POINT OF CONTACT NAME c. POINT OF GUNTAGT 1ELEYHONE NUMtltH The School Board of Broward County Principal -in -Charge, Architect of Record Scott Hennigar while atArchiteknics, Inc. 754-765-6403 24. BRIEF DESCRIPTION OF Pfl0 Provide Basic A/E Services at Bovd Anderson Senior Hiah This project included the design and construction of new facilities including concession building, press box, and bleachers. Master planning was also done in order to examine the efficiency of the placement of the new buildings. Cost: $1,292,000 Size: 2,800 SF (Buildings) / 11 Acres (Playfields) Year: 2002 ROLE Marjory Stoneman Douglas Senior High This project included the re -roofing, water -proofing and window replacement of the entire school along �'� with both interior and exterior remediation done as well. This project sought to repair a building that had failed to withstand the South -Florida climate. The Northeast building was only 5 years old, but the design had failed its expectations. We performed an in-depth study on how the building had failed and proposed a design for renovating the building to prevent future failures and a plan for repairing the damage the building had already endured. Cost: $1,859,000 Size: 140,000 SF Year: 2000 only a small sampling of projects completed: South Broward Senior Hieh This project involved the Master planning study of [he entire campus in order to examine the efficiency and the placement of the new buildings. Cost: N/A Year. 1999 Hallandale Elementary This project involved the Master planning study of the entire campus in order to examine the efficiency and the placement of the new buildings. Cost: N/A Year: 1999 High School This project included the design and construction of new facilities including concession building, press box, and bleachers. Master planning was also done in order to examine the efficiency of the placement of the new buildings. Cost: $1,890,000 a" Size: 4.500 SF (Buildings) / 11 Acres (Playfields) Year: 2001 ROLE 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 111 FIRM NAME (21 FIRM LOCATION (City and State) (3) STANDARD FORM 330 ( ROLE a, Lourdes Rodriguez, AIA, Principal Miami, Florida Principal -in -Charge, Architect of Record while atArchiteknics, Inc. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. 11) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (11 FIRM NAME 121 FIRM LOCATION (City and State) 13) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. slzooa) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SZu. EXAMPLI 01 LAI IFIr.ATI0NC Fr1R THIO r_0FJTRAr:T I NUMBER (Present as many projects as requested by the agency, or 1 COrnOlete one Section F for each orc if not specified. 21. TITLE AND LOCATION (City and State) NAME 22, YEAR COMPLETED Miami -Dade County Equitable Distribution Program (3) ROLE a. Rodriguez Architects, Inc. PROFESSIONAL SERVICES CONSTRUCTION (/t applcablel Continuing Services Agreement w/ Miami -Dade County for all county depts. NAME 1 2006 — Present 2007 — Present a. PROJECT OWNER Miami -Dade County 23. PROJECT OWNER'S INFORMATION Varies by Agency ±a. nRIEP UESCMIYI IUN OF PHUJECI AND HELE VANCE I U I HIS CUN I RACT (/nclude scope, size, and cost/ Miami -Dade Housing Agency & GSA: Assess various public housing projects for compliance with the Uniform Federal Accessibility Standards (UFAS), identify barriers, develop design solutions and prepare construction documents for barrier removal. Scope includes dwelling units, all non -dwelling areas such as offices, community rooms, lobbies, cafeterias, employee areas and other public spaces as well as site access. Responsible developing preliminary budget for construction costs and maintain Owner apprised of budget implications of proposed modifications. Some sites: Ward Towers — 18 -Story, 200 Unit site requiring 10 fully accessible and 4 audiolvisual accessible units in addition to site access including parking, drop-off area and walkways. Ward ALF Tower — 5 -story, 100 Unit site requiring 5 fully accessible and 2 audio/visual accessible units in addition to a community center, offices, full service cafeteria and site elements including parking. Little River Plaza — 5 -story, 86 Unit site requiring 5 fully accessible and 2 audio/visual accessible units in addition to a small community room, lobbies, laundry areas and site elements including parking. Region 1 Offices — 1 -story regional service offices, parking and other site elements Miami -Dade County Aviation Department: Terminal E—Re-roofing Building 44 — Re -roofing Building 100 — Tenant Spaces Building 100 — HVAC Issues Miami -Dade Corrections: Pre -Trial Detention Center — Re- roofing 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT STANDARD FORM 330 (6/2004) (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. Rodriguez Architects, Inc. Coral Gables, Florida Principal -in -Charge, Architect of Record (1) FIRM NAME 121 FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and Statel (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. 6 Complete one Section F for each project. l 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Modular Building Program (11 Projects), Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (if applicable) Site Adaptation A/E Services 2005-2008 1 2006-2008 23. PROJECT OWNER'S INFORMATION Miami -Dade County Public Schools 24. BRIEF DESCRIPTION OF PROJECT AND Modular Building Program These 11 projects were aimed to add as many student stations as possible to existing school campuses while minimizing the impact of the addition on available playing fields and other areas of high importance. The student stations were added with the construction of a Prototypical Modular Classroom Building (designed by another A/E) developed by Miami Dade County Public Schools (M-DCPS) to alleviate overcrowding, Due to the limited site conditions on several of the project sites, the program required the removal and replacement of existing buildings, shelters, playground equipment and playfields. In conjunction with the additions and renovations, access and verification of utility services, including electrical, sanitary and fire sprinkler services, were carefully considered with upgrades to Fire Alarm and Public Address Systems. Parking needs were investigated and dealt with accordingly. Parking Spaces were added to satisfy the increased number of staff personnel that resulted from the addition of the Modular Buildings. The scope also included providing mechanical buildings with emergency generators, new prototype replacement shelters, new walkways connecting existing buildings with new constructions, playground equipment, new playfields, and irrigation systems (where necessary). All of these scopes were part of our Site Adaptation Contract. Size: Varies Cast:$500,000.00 - $2,000,000.00 Average Cost per Project for the scope of the work of Site Adaptation that was under contract with the firm. 305-995-1446 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT STANDARD FORM 330 (6)2004 (11 FIRM NAME (2) FIRM LOCATION (City and State) 13) ROLE Lourdes Rodriguez, AIA, Principal Miami, Florida Principal -in -Charge, Architect of Record a. while at Architeknics, Inc. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE h. (1) FIRM NAME (2) FIRM LOCATION (City and State) 13) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. ) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLI QUALIFICATIONS FOR THIS CONTRACT I NUMBER (Present as many projects as requested by the agqency, or 1 Complete one Section F {or each orc Department of Management Services, State of Florida (Dade, Broward, Monroe and Palm Beach Counties) Continuing Contract (2005.2008) i{not specified. 23. PROJECT OWNER'S INFORMATION Department of Management Services I Jeremiah Lahey 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO Provide Basic A/E Services at Locations throughout Mi Broward County: Department of Juvenile justice - Study This project involved different schematic studies and scope verifications as well as additional services to provide as -built documentation of architectural, mechanical, electrical, plumbing and structure. In addition, Lourdes Rodriguez, AIA provided cost estimates for the remodeling/renovation of the 6,500 SF building. Cost: $37,500 Year: 2005 Fowth District Court of Appeals -Study This project involved different schematic studies and scope verifications for the re -roofing of the existing building. a Cost: $20,000 Year: 2005, Morn'oe County: Windley Key -Study This project involved preparing a feasibility study, environmental report, site survey, and water improvement study to record the development potential of the property. In addition, Lourdes Rodriguez, AIA provided cost estimates for the addition of a new 3,000 SF building and new docks. Cost: $1.0,000 Year: 2005 22. YEAR COMPLETED SIGNAL SERVICES CONSTRUCTION ttf at 2005-2009 2005-2009 904-359-6093 Ye scope, srze, antl cost/ County, Palm Beach, and Monroe Counties. Sampling of projects: Miami -Dade County: Rhode Building This project involved the waterproofing of the fourth level pedestrian deck of this building. In addition, Lourdes Rodriguez, AIA provided cost estimates for the renovation of this 8,100 SF space as well as design development, contract document, bidding, and construction administration. In addition, we provided cost estimates, design development, contract documents, bidding, and construction administration for four tenant improvement projects throughout the building, Cost: All Projects $1,000,000 & Under Year: 2005-2009 .I Third District Court of Appeals T bhis multi -phased project involved the re -roofing of oth of the buildings on the premises. Cost: $111,000 (Phase q / $667,700 (Phase 11) ear: 2006-2008 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (n FIRM NAME (2) FIRM LOCATION y and Sfafe) (3) ROLE a Lourdes Rodriguez, AIA, Principal Miami, Florida 0: CL STANDARD FORM 330 (6)2004) PAGE 3 Architect of Record while atArchiteknics, Inc. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION /City and State) (3) ROLE G. (1) FIRM NAME (2) FIRM LOCATION (City and State) - (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME 12) FIRM LOCATION /(sty and State) (3) ROLE f* STANDARD FORM 330 (6)2004) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 pro/acts, if not specified. B Complete one Section F tar each project./ 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED City of Miami, Miami, FL PROFESSIONAL SERVICES CONSTRUCTION Irl appticabL A/E Proiect Consultant Continuine Contract (2014-2016) 2014-2016 1 2014-2016 23. PROJECT OWNER'S INFORMATION City of Miami I Carlos Lozano 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT Ilnclude scope, size, and cast) Provide Basic A/E Services at various City Locations. The projects included: Belafonte Tacolcy Park This project involved the re -roofing and clerestory window replacement the existing community center. Renovations included replacement of windows and roofing membrane, while maintaining the existing plywood and wood substructure. Cost: $198,660.00 Year: 2017 MDCR Pre -Trial Detention Center Faciliri Re -roofing scope included raising all existing equipment as required by code, replacement of all existing exhaust fans, re-routing of conduits that were installed on the parapet walls and removal of all abandoned roof equipment. Work was conducted under strenuous conditions due to the use of the building (county jail). Equipment, hours of operation, clearances made for an extended work day. Cost: $555,000.00 Year: 2016 Fire Department/Fire Station Generators Replace existing generators. 305-416-1247 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT STANDARD FORM 330 (6/2004) (1) FIRM NAME (2) FIRM LOCATION y and State/ (3) ROLE a Rodriguez Architects, Inc Coral Gables, Florida Principal-in•Charge, Architect of Record (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C, (1) FIRM NAME (2)FIRM LOCATION (City and State) (3) ROLE d, (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) HOLE f. PAGE 3 F. EXAMPLE (Present as many projects as City of Coral Gables, Coral Gables, FL a. YHUJtI:I UWN[H City of Coral Gables i[1f3i:7Hl jested by the agency, or 10 pro/ects, if not specified. one Section F for each oroiect.l E 22. VEAR COMPLETED SIONAL SERVICES CONSTRUCTION lrt a{ 2020-2022 2020-2022 23. PROJECT OWNER'S INFORMATION Letrice Smith 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS No projects to date. 305.460-5121 scope, 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and STANDARD FORM 330 ( State) (3) ROLE a Rodriguez Architects, Inc. Coral Gables, Florida Principal -in -Charge, Architect of Record (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. 1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION /City and State) (3) ROLE f. s/zona) PAGE 3 F. EXAM YLt I'KUJEL; I b WKIGK t3tb I ILLL15I KA I t YKUHl I tAM'b 20. EXAMPLE PROJECT KEY QUALIFICATIONS FOR THIS CONTRACT NUMBER (Present as many projects as requested by the agency, or 10 projects, if not specified. 10 Complete one Section F for each project.) 21. TITLE AND LOCATION (Cltyand State) 22. YEAR COMPLETED Miami Southridge Senor High School - Gaming & Animation Miami, FL PROFESSIONAL SERVICES CONSTRUCTION Illapplicable) 2019 2019 a. PROJECT OWNER Miami Dade County Public Schools OF PROJECT AND 23. PROJECT OWNER'S INFORMATION Maria Sanchez TO THIS CONTRACT (Include scope, size, and cost) :. YUIN I Uh UUN IHU I I tLtYFIUNt 305-238-7213 This project involved the conversion of existing standard classrooms into a suite of computer labs, maker spaces, and a technology collaboration suite/common area. Each space required unique technological specifications, and an emphasis on visibility from common areas into the computer lab spaces. Scopes of work that were included in this project were: • Video Game and Animation Computer Lab � • Business & Information Technology Lab 1 ,' • Mobile App Development Lab • 3D printing/maker space • Technology Collaboration Suite • Convert existing classrooms and hallway into one collaboration room • New electrical outlets and data outlet for new computers and "ticker tape board" • New Windows in existing wall to connect rooms visually • New carpeting SIZE: 12,000 SF COST: $241,855.00 0 L_ 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT N STANDARD FORM 330 (REV. 8/2016) PAGE 3 (1) FIRM NAME (2) FIRM LOCATION (Cltyand Stale) (3) ROLE a Rodriguez Architects, Inc. Coral Gables, F3 Architect of Record (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE G. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (Cltyand State) (3) ROLE f.MA STANDARD FORM 330 (REV. 8/2016) PAGE 3 G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 26. NAMES OF KEY PERSONNEL (From Section E, Block 12) 27, ROLE IN THIS28, CONTRACT (From Section E, Block 13) EXAMPLE PROJECTS LISTED IN SECTION F (Fill in "Example Projects Key" section below before completing table. Place "X" under project key number for participation in same or similar role.) 1 2 3 4 5 6 7 8 9 10 Lourdes Rodriguez, AIA Principal -in -Charge City of Miami - Continuing Contract X X X City of Coral Gables X X 10 X X Miguel A. Rodriguez, FAIA Principal, Quality Assurance Manager X X X X X Antonio Moreno Senior Project Manager X X X X Cuauhtemoc Valle Production Manager X X X Rosi Cutrone Project Coordinator X X X Ernesto Aloma, PE Principal -in -Charge X Jose I. Martinez, PE Sr. Mechanical Engineer X Hector J. Castillo, PE Electrical Engineer X Armando Sales, PE Principal -in -Charge X X 29. EXAMPLE PROJECTS KEY NO. TITLE OF EXAMPLE PROJECT FROM SECTION F NO. TITLE OF EXAMPLE PROJECT FROM SECTION F 1 University of Miami -Master Agreement 6 MDCPS - Modular Building Program 2 MDCPS - A/E Continuing Contract 7 DMS - Continuing Contract 3 MDC - A/E Continuing Contract 8 City of Miami - Continuing Contract 4 SBBC - A/E Continuing Contract 9 City of Coral Gables 5 Miami Dade - Continuing Services Agreement 10 Miami Southridge SHS - Gaming and Animation STANDARD FORM 330 (REV. 8/2016) PAGE 4 H. ADDITIONAL INFORMATION 30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED, CONSTRUCTION MANAGEMENT DELIVERY EXPERIENCE In the past twenty nine years, Rodriguez Architects, Inc (RAI) has gained extensive experience in remodeling, renovations, repairs, and upgrades. We are adequately prepared to work hand-in-hand with managers as a single, unified team to ensure all bases are covered, issues are resolved, and that the project progresses smoothly and efficiently. PROJECT MANAGEMENT AND COLLABORATION RAI has extensive experience working with teams on complicated projects of educational design. We pride ourselves on our communication skills and our ability to keep a group of individuals operation as a single entity working towards a singular goal. We realize that the key to effective communication is the establishment of trust and a commitment to transparency. If our documentation is shared transparently, errors can be caught quickly and rectified just as quickly and effectively, so that the project can stay on track and on time. QUALITY ASSURANCE AND QUALITY CONTROL RAI has built quality control into every phase of our work, as projects can change on a moment by moment bases. To judge the quality of the work, it helps to be as close as possible to the work, or the building itself. We utilize a systematic approach to quality control, using the same process for each project, creating a consistent approach that reduces communication issues. This simultaneously maintains the dual benefit of keeping a team working together and towards the same goals. CONSTRUCTION ADMINISTRATION CAPABILITIES RAI has maintained a reputation among our clients and contractors of being responsive throughout the construction phase. As such, we are known for the quality of our work. To achieve this, we are clear and concise on our specifications; consistent and timely in our support for the contractor during the construction phase. We view construction administration as an extension of architecture, therefore our team members who develop and document our designs, also perform construction administration services. I. AUTHORIZED REPRESENTATIVE The forecoina Is a statement of facts. 31 8/14/20 STANDARD FORM 330 (REV. 8!2016) PAGE 5 ARCHITECT -ENGINEER QUALIFICATIONS PART II - GENERAL QUALIFICATIONS If a firm has branch offices, complete for each specific branch office seeking work. 2a. FIRM (OR BRANCH OFFICE) NAME Rodriguez Architects, Inc 3. YEAR ESTABLISHED 1990 4. DUNS NUMBER 555912508 2b. STREET 2121 Ponce de Leon Boulevard, Suite 1010 5. OWNERSHIP a. TYPE Corporation 2c. CITY Coral Gables 2d. STATE FL 2e. ZIP CODE 33134 b. SMALL BUSINESS STATUS MMBE & SBE 6a. POINT OF CONTACT NAME AND TITLE Lourdes Rodriguez, AIA - President 7. NAME OF FIRM (If block 2a is a branch N/A office) 6b, TELEPHONE NUMBER 305-448-3373, Ext. 203 6c. E-MAIL ADDRESS lourdes@rodriguezarchitects.com Be. FORMER FIRM NAME(S) (If any) 8b. YR. ESTABLISHED 8c. DUNS NUMBER Miguel A. Rodriguez, AIA, Architect 1984 N/A 9. EMPLOYEES BY DISCIPLINE AND 10, PROFILE OF FIRM'S EXPERIENCE ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function Code b. Discipline c. No, of Employees a. Prof le Code b. Experience c R Number see below (i) FIRM (2) BRANCH 06 Architect 2 C08 Codes Standards Ordinances 1 48 Project Manager 3 C10 Comm. Bldg. & Shpq. Centers 1 08 CADD Technician 2 C18 Cost Estimating, Analysis, Etc 1 02 Administrative 1 D07 Dining Halls Clubs Restaurants 2 E02 Education Facilites 4 H10 I Hotels Motels 3 H11 Housing 2 105 Interior Designs, Space Planning 1 R06 Rehabilitation (Bldgs., Struct. 1 R12 Roofing 1 Z01 Zoning, Land Use Studies 1 Expert Consulting - ADA/UFAS 1 Expert Witness: Codes and 1 Standard of Care Other Employees Total 8 11, ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) PROFESSIONAL SERVICES REVENUE INDEX NUMBER 1. Less than $100,000 6. $2 million to less than $5 million 2. $100,00 to less than $250,000 7. $5 million to less than $10 3. $250,000 to less than $500,000 8. $10 million to less than $25 4. $500,000 to less than $1 million 9. $25 million to less than $50 5. $1 million to less than $2 million 10. $50 million or greater million million million a. Federal Work b. Non+�4e I Work 5 c. Total Mk 5 n 12. AUTHORIZED REPRESENTATIVE The foregolnq Is a statement of facts. Principal AUTHORIZED EOR LOCAL REPRODUCTION 8/14/20 LICENSES O RFQ 20-07-01 Continuing Professional Consulting Services (CCNA) RA RICK SCOTT, GOVERNOR JONATHAN ZACHEM. SECRETARY Flpr d 0�4; W� STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF ARCHITECTURE & INTERIOR DESIGN THE ARCHITECT CORPORATION HEREIN 15 CERTIFIED UNDER THE PROVISIONS OF CHAPTER 481, FLORIDA STATUTES RODRIGUEZ ARCHITECTS, INC 2121 PONCE DE LEON BLVD, SUITE 1010 CORAL GABLES FL 33134 LICENSE NUMBER: AA0001933 EXPIRATION DATE: FEBRUARY 28, 2021 Always verify licenses online at MyFloridaLicense.com Do not alter this document in any form. (] This is your license. It is unlawful for anyone other than the licensee to use this document. O RFQ 20-07-01 Continuing Professional Consulting Services (CCNA) RA LICENSES O X RFQ 20-07-01 ContinuinProfessional Consulting Services (CCNA) II'1>I I of RICH SCOTT. GOVERNOR JONATHANZ CHEM.SECRETARY 0 dF�pr 9 STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF ARCHITECTURE & INTERIOR DESIGN THE ARCHITECT HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 481, FLORIDA STATUTES RODRIGUEZ, LOURDES 2121 PONCE DE LEON BLVD. SUITE 1010 CORAL GABLES FL 33134 L LICENSE NUMBER: AR0011630 EXPIRATION DATE: FEBRUARY 28,2021 Always verify licenses online at MyFloddaLlcensecom ❑� ❑� }Do not alter this document in any form. 41 r This is your license. It Is unlawful for anyone other than the licensee to use this document Or. . O X RFQ 20-07-01 ContinuinProfessional Consulting Services (CCNA) II'1>I I RICK SCOTT, GOVERNOR JONATHANZACHEM.SECRETARY I dr 9 STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF ARCHITECTURE & INTERIOR DESIGN THE ARCHITECT HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 481, FLORIDA STATUTES RODRIGUEZ, MIGUEL A RODRIGUEZ ARCHITECTS, INC. 2121 PONCE DE LEON BLVD. SUITE 1010 CORAL GABLES FL 33134 C_LICENSE NUMBER: AR0010099 EXPIRATION DATE: FEBRUARY 28, 2021 Always verify licenses online at MyFioridaLicense.com oma^ o Do not alter this document in any form. L•U[r'"'er This is your license. it is unlawful for anyone other than the licensee to use this document O X RFQ 20-07-01 ContinuinProfessional Consulting Services (CCNA) II'1>I I FIRM REFERENCES AND SIMILAR WORK COMPLETED Reference 1: 1. Client Info: a. Client's Name: Miami -Dade County Public Schools b. Address: 1450 NE 2nd Ave, Miami, FL 33132 C4 Contact: Victor Alonso, Eco -Sustainability Officer d. Phone No.: 305-995-4502 e. E -Mail: valonso2@dadeschools.net 2. Project Info: a. Project Title: A/E Project Consultant Continuing Contract (2012-2022) b. Description of Work: Work included, but was not limited to: Additions, upgrades, remodeling, HVAC replacement, cooling tower replacement, Fire Alarm replacement, concrete repairs, covered walkways. c. Year Completed: Ongoing 3. Team Members: Lourdes Rodriguez, AIA; Miguel A. Rodriguez, FAIA; Antonio Moreno, Cuauhtemoc Valle, Rosi Cutrone; Ernesto Aloma, PE; Jose I. Martinez, PE; Hector J. Castillo, PE; Armando Salas, PE Reference 2: 1. Client Info:p a. Client's Name: Miami Dade College b. Address: 11011 SW 104th St, Miami, FL 33176 c. Contact: Bryan Whitefield d. Phone No.: 305-237-0522 e. E -Mail: bwhitefi@mdc.eclu 2. Project Info: a. Project Title: A/E Project Consultant Continuing Contract (2001-2004, 2015-2020) b. Description of Work: Work included, but was not limited to: Renovation and remodeling of existing Labs, from Computer to Nursing; renovation of exterior cladding; exterior cleaning, painting, and waterproofing; renovation of classrooms and dining areas; and re -roofing. c. Year Completed: Ongoing 3. Team Members: Lourdes Rodriguez, AIA; Miguel A. Rodriguez, FAIA; Antonio Moreno, Cuauhtemoc Valle, Rosi Cutrone; Ernesto Aloma, PE; Jose I. Martinez, PE; Hector]. Castillo, PE; Armando Salas, PE Reference 3: 1. Client Info: a. Client's Name: University of Miami b. Address: 1535 Levante Ave., Ste. 205, Coral Gables, 33146 C* Contact: David Shewairy d. Phone No.: 305-284-1351 e. E -Mail: dshewairy@miami.edu 2. Project Info: a. Project Title: Multiple Project Assignments for Design and Construction Facilities, Operations, and Planning b, Description of Work: Exterior and interior renovations atvarious buildings located on multiple University campuses. Assignments included, but were not limited to, interior tenant build -outs, restroom renovations, accessibility improvements, and classroom renovations. c. Year Completed: Ongoing 3. Team Members: Lourdes Rodriguez, AIA; Miguel A. Rodriguez, FAIA; Antonio Moreno, Cuauhtemoc Valle, Rosi Cutrone; Ernesto Aloma, PE; Jose I. Martinez, PE; Hector]. Castillo, PE; Armando Salas, PE RFQ 20-07-01 Continuing Professional Consulting Services (CCNA) State of Florida Department of State I certify from the records of 0o Ve that RODRIGUEZ ARCHITECTS, INC. is a corporation organized under the laws of the State of Florida, filed on May 15, 1990. The document number of this corporation is L72950. I further certify that said corporation has paid all fees due this office through December 31, 2020, that its most recent annual report/uniform business report was filed on January 15, 2020, and that its status is active. I further certify that said corporation has not filed Articles of Dissolution. Given under my hand and the Great Seal of the State of Florida at Tallahassee, the Capital, this the Fifteenth day of January, 2020 Tradting Number: 9627229463CC Secretary of State To authenticate this cercate,vt the following site,enter [his number, and then follow the iustrucflons displayed. haps://servicessunbiz.org/hilings/CertiricateOfS talus/CerBficateAuthen tication 2020 FLORIDA PROFIT CORPORATION ANNUAL REPORT DOCUMENT# L72950 Entity Name: RODRIGUEZ ARCHITECTS, INC. Current Principal Place of Business: 2121 PONCE DE LEON BLVD 1010 CORAL GABLES, FL 33134 Current Mailing Address: 2121 PONCE DE LEON BLVD 1010 CORAL GABLES, FL 33134 US FEI Number: 65-0197336 Name and Address of Current Registered Agent: RODRIGUEZ, MIGUEL A, 1026 ADUANA AVENUE CORAL GABLES, FL 33146 US FILED Jan 15, 2020 Secretary of State 9627229463CC Certificate of Status Desired: Yes The above named entity submits this statement /or the purpose of changing its registered o/fice or registered agent, or bath, in the State o/Florida. SIGNATURE: Electronic Signature of Registered Agent Officer/Director Detail Title VPD Name RODRIGUEZ, MIGUEL A. Address 1026 ADUANA AVENUE City -State -Zip: CORAL GABLES FL 33146 Title PD Name RODRIGUEZ, LOURDES Address 1026 ADUANA AVENUE City -State -Zip: CORAL GABLES FL 33146 I hereby certify fha( the inlovmaficn indicated on this report crsupplemenfal report is true andaccurate and that my elecfmnlc signature shall have the same legal eflecf as if made unde/ oath; that I am an otlicerordirectpral fhecorporation or the receiver or trustee empowered fo execute this report as required by Chapter 607, Flodda Statutes; antl that my name appears above, or on an attachment with all other like empowered. SIGNATURE: MIGUEL ANGEL RODRIGUEZ VICE PRESIDENT 01/15/2020 Electronic Signature of Signing Officer/Director Detail Date DIY OF silo he DELIVER TO; REQUEST FOR City of Sunny Isles Beach QUALIFICATIONS OPENING: 2.30 P.M. City Clerk SECTION 6 Tuesday, August 11, 18070 Collins Avenue RESPONDENT SUBMITTAL 2020 Sunny Isles Beach, FL 33160 FORMS NOTE: City of Sunny Isles Beach is exempt from all taxes (Federal, State, and Local). Tax Exemption Certificate furnished upon request. Issued by: Purchasing Agent Date Issued: This Qualifcation Submittal Genesis Cuevas Wednesday, July 8, Consists of all required forms, 2020 including SF330, Questionnaires, Acknowledgements and Affidavits Submissions are subject to the Terms and Conditions of this Request for Qualifications and the accompanying Submittal. Such other contract provisions, specifications, drawings or other data as are attached or incorporated by reference in the Submittal, will be received at the office of the City Clerk at the address shown above until the above stated time and date, and at that time, publicly opened for furnishing services described in the accompanying Submittal Requirement, RFQ No. 20-07-01 Continuing Contract for Professional Services CCNA Firm Name Commodity Code(sJ; RETURN ONE ORIGINAL AND FOUR COPIES OF QUALIFICATION SUBMITTAL PAGESAND AFFIDAVITS FAILURE TO SIGN PAGE 38 OF SECTION 6 QUALIFICATION SUBMITTAL WILL RENDER YOUR SUBMISSION NON-RESPONSIVE City of Sunny Isles Beach � Request for Qualifications No. 20-07-01 OF SUN pr• 6.1 ACKNOWLEDGEMENT FORM NAME OF COMPANY: Rodriguez Architects, Inc. (Name of company submitting RM) CHECI( CATEGORY (CATEGORIES) YOU ARE APPLYING FOR: 1 -ARCHITECTS X 2 -CIVIL ENGINEERS 3- ELECTRICAL ENGINEERS 4 -SURVEYORS AND MAPPING 5- LEAK DETECTION STUDIES 6 -MECHANICAL, HVAC &PLUMBING ENGINEERS_ 7 -GEOTECHNICAL 8 — STRUCUTRAL ENGINEERS 9 —ENVIRONMENTAL ENGINEERS 10. CONSTRUCTION ENGINEERING AND INSPECTION (CEI) SERVICES_ City of Sunny Isles Beach � Request for Qualifications No. 20-07-01 PRIME FIRM Role Princi ple-in-Charge: Projeet Manager Asst. Project Manager REQUIRED FORMS Name of Individual Number of Assigned to Project Experience Lourdes Rodriguez, AIA Rosi Cutrone, Associate AIA Antonio Moreno Other Key Member Miguel A. Rodriguez, FAIA Other Key Member REFERENCES Name Victor Alonso, Eco -Sustainability Officer Bryan Whitefield Cuauhemoc Valie Firm Providing Reference Miami -Dade County Public Schools Miami Dade Collage David Shewairy University of Miami or SUN Years' Education, Degree Bachelor of Architecture; UM; 34 1983 Associate of Arts/Architecture; MDCC;1980 Bachelor of Architecture; B FAU;2017 Master of Construction Management; FIU; 2011 33 School of Architecture; UF; 1987 Bachelor of Architecture; UM; 36 1981 Associate of Arts/Architecture; MDCC; 1978 14 School of Architecture; UF; 1987 Phone # Email Address 305-995-4502 valonso@dadeschools.net 305-237-0522 bwhitefi@mdc.edu 305-284-1351 dshweairy@miami.edu City of Sunny Isles Beach � Request for Qualifications No. 20-07-01 OF SUN hr' ACKNOWLEDGEMENT OF ADDENDA INSTRUCTIONS: COMPLETE PART I OR PART II, WHICHEVER APPLIES PART I: LIST BELOW ARE THE DATES OF ISSUE FOR EACH ADDENDUM RECEIVED IN CONNECTION WITH THIS RFQ PART II: Addendum #1, Dated July17, 2020 Addendum #2, Dated July281 2020 Addendum #3, Dated August 3, 2020 Addendum #4, Dated August 7, 2020 Addendum #5, Dated Addendum #6, Dated Addendum #7, Dated Addendum #8, Dated ❑ NO ADDENDUM WAS RECEIVED IN CONNECTION WITH THIS RFQ FIRM NAME: AUTHORIZED SIGNA TITLE OF OF City of Sunny Isles Beach � Request for Qualifications No. 20-07-01 OF SUN RESPONDENT SUBMITTAL FORM RFQ 20mVwOl Continuing Professional Consulting Services (CCNA) The undersigned Firm proposes and agrees, if this submission is accepted, to enter into an agreement with the City of Sunny Isles Beach to perform and furnish all Services as specified or indicated in the Contract Documents, The Firm accepts all of the terms and conditions of this Request for Qualifications. This Bid will remain subject to acceptance for 90 days after the day of Bid opening. The Firms agrees to sign and submit the Agreement and other documents as required by the Bidding Requirements within ten days after the date of the City's Notice of Award. In submitting this response, the Firm represents, as more fully set forth in the Agreement, that: • The Firm has familiarized himself/herself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Law and Regulations that in any manner may affect cost, progress, performance, or furnishing of the Work. • The Firm has studied carefully all reports and drawings of subsurface conditions and drawings of physical conditions. • The Firm has given the City written notice of all conflicts, errors, discrepancies that it has discovered in the Contract Documents and the written resolution thereof by City is acceptable to the Firm. • This solicitation is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation; the Firm has not directly or indirectly induced or solicited any other Firms to submit a false or sham Bid; the Firm has not solicited or induced any person, firm or corporation to refrain from Bidding; and Firm has not sought by collusion to obtain for itself any advantage over any other Firms or over the City. The City and the successful Firm will establish completion times for the services described in this Request for Qualifications and the successful Firm agrees that the services will be completed within the time frames agreed upon and stipulated in the individual Notice to Proceed. City of Sunny Isles Beach � Request for Qualifications No. 20-07-01 Firm Name: Rodriguez Architects, Inc. Street Address: 2121 Ponce de Leon Blvd., Ste. 1010, Coral Gables, FL 33134 Mailing Address (if different): Telephone No. 305-448-3373 No. 305-448-3374 Email Address: iourdes@rodriguezarchitects.com FEIN No. � 5-������ 6 * "By signing this Signature: (Signature of a Print Name: Title: President the Responder agrees to all Terms 0f SUN Pr' THE EXECUTION OF THIS FORM CONSTITUTES THE UNEQUIVOCAL OFFER OF FIRM TO BE BOUND BY THE TERMS OF ITS SUBMISSION. FAILURE TO SIGN THIS SOLICITATION WHERE INDICATED ABOVE BY AN AUTHORIZED REPRESENTATIVE SHALL RENDER THE SUBMISSION NON-RESPONSIVE. THE CITY MAY, HOWEVER, IN ITS SOLE DISCRETION, ACCEPT ANY SUBMISSION THAT INCLUDES AN EXECUTED DOCUMENT, WHICH UNEQUIVOCALLY BINDS THE FIRM TO THE TERMS OF ITS OFFER. City of Sunny Isles Beach � Request for Qualifications No. 20-07-01 SupNY J$t Ff my NON -COLLUSION AFFIDAVIT City of Sunny Isles Beach r 18070 Collins Avenue r l O0. Sunny Isles Beach, FL 33160 oF so" Telephone: (305) 947-0606 Fax: (305) 949-3113 STATE OF FLORIDA COUNTY OF Mlafill-Dade ) The undersigned being first duly sworn as provided by law,. deposes, and says: This Affidavit is made with the knowledge and intent that it is to be filed with the City of Sunny Isles Beach City Commission and that it will be relied upon by said County, in any consideration which may give to and any action it may take with respect to this Bid. The undersigned is authorized to make this Affidavit on behalf of, of which he is Rodriquez Architects, Inc. (Name of Corporation, Partnership, Individual, etc.) a COrPOratlOn ,formed under the laws of Florida (Type of Business) (State) President (Sole Owner, Partner, President, etc.) Neither the undersigned nor any person, firm, or corporation named in above Paragraph 10.2, nor anyone else to the knowledge of the undersignedL have themselves solicited or employed anyone else to solicit favorable action for this Bid by the City, alsc that no head of any department or employee therein, or any officer of the City of Sunny Isles Beach, Florida is directly interested therein. This Bid is genuine and not collusive or a sham; the person, firm or corporation named above in Paragraph 10.2 has not colluded, conspired, connived or agreed directly or Indirectly with any proposers or person, firm or corporation, to put in a sham Bid, or that such person, firm or corporation, shall refrain from Bidding, and has not in any manner, directly or Indirectly, sought by agreement or collusion, or communication or conference with any person, firm or corporation, to fix the prices of said Bid or Bids of any other proposers; and all statements contained in the Bid Ars described above true; and further; neither the undersigned, nor the person, firm or corporation named above in Paragraph 10.2 has it tly or indirectly submitted said Bid or the contents thereof, or divulged information or data relative thereto, to any association or to al(iy m mb r or agent thereof. President AFFIANT'S TITLE TAKEN, SWORN AND SUBSCRIBED TO BEFORE ME this � day of August , 2g 2q Personally Known X or Produced Identification , Type of identification (Affix seal here) �P`'4 MARIE MOORMAN MY COMMISSION# GGI45117 �7 00 EXPIRES: November 19,2021 DECEMBER 28, 2010 Off' SJNNY 1S4 F� PUBLIC ENTITY CRIMES City of Sunny Isles Beach `: •Y 18070 Collins Avenue se ,y, F `o R, ` Sunny Isles Beach, FL 33160 oF sux "'qs Telephone: (305) 947-0606 Fax: (305) 949-3113 SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a) FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES PUBLIC ENTITY CRIMES Pursuant to the provisions of paragraph (2) (a) of Section 287.133, Florida State Statutes - "A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a Bid on a Contract to provide any goods or services to a public entity, may not submit a Bid on a Contract with a public entity for the construction or repair of a public building or public Work, may not submit Bids on leases of real property to a public entity, may not be awarded to perform Work as a Contractor, supplier, Sub -Contractor, or Consultant under a Contract with any public entity, and may not transact business with any public entity in excess of the threshold amount Category Two of Sec. 287.017, FS for thirty six months from the date of being placed on the convicted vendor list". THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS. 11.1. This sworn statement is submitted to City of Sunnv Isles Beach by Lourdes Rodriguez, AIA pnn in rvi ua s name and difel for Rodriquez Architects Inc. nn name o en ,i—subuin cy sworn s a emen whose business address is: 2121 Ponce de Leon Bivd., Ste. 1010 Coral Gables, FL 33134 and. (if applicable) its Federal Employer Identification number (FEIN) is 65-0197336 (If the entity had no FEIN, include the Social Security Number of the individual signing this sworn statement: ) 11.2. I understand that a "public entity crime" as defined in Paragraph 287.133(1)(8), Florida Statutes, means a violation of any state or federal law by a person with respect to antl directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or with the United States, including, but not limited to, any Bid or Contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation. 11.3. I understand that "convicted" or "conviction" as defined in Para. 287.133(1)(b), Florida Statutes, means a finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trail court of record relating to charges brought by indictment or information after July 1, 1989, as a result of a jury verdict, non -jury trial, or entry of a plea of guilty or nolo contendere. 11.4. I understand that an "affiliate" as defined in Para. 287.133(1)(a), Florida Statutes, means: a.) predecessor or successor of a person convicted of a public entity crime; or b.) Any entity under the control of any natural person who is active in the management of the entity anA who has been convicted of a public entity crime. The term "affiliate" includes those officers, directors, executors, partners, shareholders, employees, members, and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair OEcen�eEa 28, 2010 market value under an arm's length agreement, shall be a prime facie case that one person controls another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall be considered an affiliate. 11.5. I understand that a "person" as defined in Para. 287.133(1)(e), Florida Statutes, means any natural person or entity organized under the laws of any state or of the United States with the legal power to enter into a binding Contract and which Bids or applies to Bid on Contracts for the provision of goods or services let by a public entity, or which otherwise transacts or applies to transact business with a public entity. The term "persons" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in management of any entity. 11.6. Based on information and belief, the statement which I have marked below is true in relation to the entity submitting this sworn statement. (Indicate which statement applies.) Neither the entity submitting this sworn statement, nor any of it's officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, nor any affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. However, there has been a subsequent proceeding before a Hearing Officer of the State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer of the State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer determined that it was not in the public interest to place the entity submitting this sworn statement on the convicted vendor list. (Attach a copy of the final order.) I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 11.1 (ONE) ABOVE IS FOR THAT PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH DEC ER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED, I ALSO UNDERSTAND THAT I AM REQUIRE TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE TH H D AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES, FOR CATEGORY TWO OF At CFYANGE IN THE INFORMATION CONTAINED IN THIS FORM. By: (Printed Name) President (Title) Sworn to and subscribed before me this t� day of August , 20 20 , by Lourdes Rodriguez, AIA ,(� �/ (AFFIX NOTARY STAMP HERE) l —I Ct ll e l l/l"LQi� ° MARIE MOORMAN Signature: MY COMMISSION 9 OG 145117 °� EXPIRES: November 19, 2021 Personally Known OR Produced Identification e yVNNr IS4Ff 70 EQUAL OPPORTUNITY / AFFIRMATIVE ACTION ,Eoa ° City of Sunny Isles Beach oF sur• . 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 EQUAL OPPORTUNITY/AFFIRMATIVE ACTION STATEMENT The contractors and all subcontractors hereby agree to a commitment to the principles and practices of equal opportunity in employment and to comply with the letter and spirit of federal, state, and local laws and regulations prohibiting discrimination based on race, color, religion, natlal region, sex, age, handicap, marital status, and political affiliation or belief. r / 1 Signed: Title: Flrm: Rodriguez Architects, Inc. Address; 2121 Ponce de Leon Blvd., Ste. 1010 Coral Gables, fL 33134 �EeEMEER 28, 2010 O4 SONNY 15�F�S CONFLICT OF INTERS City of Sunny Isles Beach ,' • 18070 Collins Avenue ' • F L` Sunny Isles Beach, FL 33160 o..uv •guy Telephone:(305) 947-0606 Fax: (305)949-3113 CONFLICT OF INTEREST STATEMENT The award of any contract hereunder is subject to the provisions of Chapter 112, Florida State Statutes. Proposers must disclose with their Bids, the name of any officer, director, partner, associate or agent who is also an officer or employee of the City of Sunny Isles Beach or its agencies. Coral Gables, FL 33134 STATE OF FLORIDA COUNTY OF Miami -Dade BEFORE ME, the undersigned authority, personally appeared 18.4 Neither the Affiant nor the above named entity has directly or indirectly entered into any agreement, part Lourdes Rodriguez, AIA who was duly sworn, deposes, and states: 18.1. 1 am the President of Rodriguez Architects, Inc. with a local office in 2121 Ponce de Leon Blvd., Ste. 1010, and principal office in Coral Gables, FL 33134 18.2. The above named entity is submitting a Bid for the City of Sunny Isles Beach, RFQ No. 20-07-01 described as: RFQ Professional services. The Affiant has made diligent inquiry and provides the information contained in this Affidavit based upon his own knowledge. 18.3 The Affiant states that only one submittal for the above Bid is being submitted and that the above named entity has no financial interest in other entities submitting Bids for the same project. icipated in any collusion, or otherwise taken any action in restraints of free competitive pricing in connection with the entity's submittal for the above Bid. This statement restricts the discussion of pricing data until the completion of negotiations if necessary and execution of the Contract for this project. 18.5 Neither the entity nor its affiliates, nor any one associated with them, is presently suspended or otherwise ineligible from participation in contract letting by any local, State, or Federal Agency. 18.6 Neither the entity, nor its affiliates, nor any one associated with them have any potential conflict of interest due to any other clients, contracts, or property interests for this project. 18.71 certify that no member of the entity's ownership or management is presently applying for any employee position or actively seeking an elected position with the City of Sunny Isles Beach. 18.81 certify that no member of the entity's ownership or management, or staff has a vested interest in any aspect of the City of Sunny Isles Beach. 18.91n t e e e that a conflict of interest is identified in the provision of services, I, on behalf of the above named entity, will immediately not 1A9 Cli;y of Sunny Isles Beach, day of August , 2020. Lourdes Rodriquez, AIA Print or Type Name and Title v Swom to and subscribed before me this day of August 12020, � Personally Known X OR O Produced Identification Type of Identification NOTARY PUBLIC STATE OF FLORIDA P"""� MARIE MOORMAN MYCOMMISSIONgGGI45117 �?typq� EXPIRES: November 19, 2021 DECEMBER 28, 2010 SUNNY IS, J DISPUTE DISCLOSURE City of Sunny Isles Beach 18070 Collins Avenue rsow`o ` Sunny Isles Beach, FL 33160 or su" "' Telephone: (305) 947-0606 Fax: (305) 949-3113 DISPUTE DISCLOSURE FORM Answer the following questions by placing a "X" after "Yes" or "No". If you answer "Yes", please explain in the space provided, or on a separate sheet attached to this form. 19.1. Has your firm or any of its officers, received a reprimand of any nature or been suspended by the Department of Professional Regulations or any other regulatory agency or professional associations within the last five (5) years? YES NO X 19.2. Has your firm, or any member of your firm, been declared in default, terminated or removed from a contract or job related to the services your firm provides in the regular course of business within the last five (5) years? YES NO X 19.3. Has your firm had against it or filed any requests for equitable adjustment, contract claims, Bid protests, or litigation in the past five (5) years that is related to the services your firm provides in the regular course of business? YES NO X If yes, state the nature of the request for equitable adjustment, contract claim, litigation, or protest, and state a brief description of the case, the outcome or status of the suit and the monetary amounts of extended contract time involved. I hereby certify that all statements made are true and agree and understand that any misstatement or misrepresentation of falsification of facts shall be cause for forfeiture of rights for further consideration of this Bid for the CI of Sunny Isles Beach. //ff� �A Rod l igu z rchitects, Inc. 7 /�/ Firm 11 Date Sig DECEMBER 28, 2010 Lourdes Rodriguez, AIA; President Print or Type Name and Title S�NNv it r 04 bF n 'u F IOP oF Su ENOy STATE OF FLORIDA COUNTY OF Miami -Dade ANTI- KICKBACK City of Sunny Isles Beach 16070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 ANTI- KICKBACK AFFIDAVIT I, the undersigned, hereby duly sworn and deposed say that no portion of this sum herein Bid will be paid to any employees of the City of Sunny Isles Beach or its elected officials as a commission, kickback, reward or gift, directly or indirectly by me or any member of my firm or by an officer of the corporation. / gy; Lourdes Rodriguez, AIA Title: President The foregoing instrument was acknowledged before me -this day of August , 20 20 by Lourdes Rodriguez, AIA [name of person], as President [type of authority], for Rodriguez Architects, Inc. [name of party on behalf of whom instrument was executed]. AFFIX NOTARY STAMP HERE: g``,,f�> MARIE MOOAMAN MY COMMISSION k 99145117 '4 � EXPIRES: November 19, 2021 ota'ry Public — State o Florida It a,Q re. Hon/aal Print or Type Commissioned Name Personally Known x OR Produced Identification Type of Identification Produced DECEMBER 2e, 2070 CONTRACTOR ANTI -BOYCOTT CERTIFICATION [PURSUANT TO FLORIDA STATUTE § 215:47251 I, Lourdes Rodriguez, AIA on behalf of Rodriguez Architects, Inc. Print Name Company Name certifies that Rodriguez Architects, Inc. does not: Company Name 1. Participate in a boycott of Israel; and 2. Is not on the Scrutinized Companies that Boycott Israel list; and 3. Is not on the Scrutinized Companies with Activities in Sudan List; and 4. Is not on the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List; and 5. Has not engaged in business. operations in Cuba or Syria. President Title d IG Date FORMS AND ATTACHMENTS MIAMI-DADE COUNTY PUBLIC SCHOOLS Small Business Enterprise (SBE) Certificate THIS CESIIFlESTHAT Rodriguez Architects Inc IB OWNED AND CONIAO l cn BY A(N) SBE Tler 2 PUnSUANTTO MIAMFOADE COVNtt PUBLIC SCHOOL BOAHO POLICY 9320.D2 Oclabor 0, 2019 Oclpher 0, 2622 6515561 Issue Oale Eepirallon Oale Ventlpr No. ntlrou Jennilar Economic Equity 8 Dlveraily Compliance 011lcer 011lceat Economic Public Schools MIemNE 2nd County -Suit Schools 1950 NE 2nd Avenue - Suite 429 Mieml, Florida 33132 ` RFQ 20-07-01 Continuing Professional Consulting Services (CCNA) MIAMI Pade.gov 0 miami June 26, 2020 Miguel Rodriguez Rodriguez Architects Inc 2121 PONCE DE LEON BLVD SUITE 1010 CORAL GABLES, FL 33134 Approval Date: June 25, 2020 -Disadvantaged Business Enterprise (DBE) Anniversary Date: June 17, 2021 Dear Miguel Rodriguez, Internal Services Department Small Business Development 111 NW 1 Street, 19th Floor Miami, Florida 33128 T305-375-3111 F 305-375-3160 Miami -Dade Gounty Small Business Development (SBD), a division of the Internal Services Department (ISD), is pleased to notify you that your firm is certified under the Florida Unified Certification Program (UCP). Your firm meets the eligibility requirements for certification as a Disadvantaged Business Enterprise (DBE) in accordance with 49 CFR Part 26. DBE certification is continuous with no expiration date; however, firms are required to attest that there are no changes via the No Change Declaration form on or before the firm's anniversary date to remain certified. You will be notified of your annual responsibilities in advance of the Anniversary Date listed above. You must submit the annual No Change Declaration form no later than the Anniversary Date to maintain your eligibility. Your firm will be listed in the UCP DBE Directory which can be accessed through the Florida Department of Transportation's website: http://www3b.dot.state.fl.us/Eq ualOpportunityOfficeBusinessDirectory/. DBE certification is NOT a guarantee of work, but it enables the firm to compete for and perform contract work on all USDOT Federal Aid (FAA, FTA and FHWA) projects in Florida as a DBE contractor, sub -contractor, consultant, sub -consultant or material supplier. If at any time there is a material change in your firm, you must advise this office by sworn affidavit and support ing documentation within thirty (30) days. Changes include, but are not limited to ownership, officers, directors, management, key personnel, scope of work performed, daily operations, on-going business relationships with other firms, individuals or the physical location of your firm. After our review, you will receive instructions as to how you should proceed, if necessary. Failure to comply will result in action to remove your firm's DBE certification. It is strongly recommended that you register your firm as a vendor with Miami -Dade County. To register, you may visit: http://www.miamidade.gov/procurement/vendor-registration,asp. Thank you for your interest in doing business with Miami -Dade County. If you have any questions or concerns, you may contact our office at 305-375-3111 or sbdcert@miamidade.gov. Sincerely, Claudious Thompson, Section Chief Small Business Development NAICS & Industry Title: (Your firm is eligible to compete for and perform work on all USDOT Federal Aid projects throughout Florida and may earn DBE or ACDBE credit for work performed in the following areas.) NAICS 541310: ARCHITECTURAL SERVICES of M2 miamidade.gov June 25, 2020 Miguel Rodriguez Rodriguez Architects, Inc. 2121 PONCE DE LEON BLVD SUITE 1010 CORAL GABLES, FL 33134 Approval Date: June 17, 2020 -Small Business Enterprise -Architectural &Engineering (SBE -A&E) Expiration Date: June 30, 2023 Dear Miguel Rodriguez, Internal Services Department Small Business Development 111 NW 1 Street, 19th Floor Miami, Florida 33128 T 305-375-3111 F 305-375-3160 Miami -Dade County Small Business Development (SBD)., a division of the Internal Services Department (ISD) has completed the review of your application and attachments submitted for certification. Your firm is officially certified as a Miami -Dade County Small Business Enterprise - Architectural & Engineering (SBE -A&E). The Small Business Enterprise (SBE) programs are governed by sections 2-8.1.1.1.1; 2-8.1.1.1.2; 2-10.4.01; 10-33.02 of Miami -Dade County's Codes, This Small Business Enterprise -Architectural &Engineering (SBE -A&E) certification is valid for three years provided that you submit a "Continuing Eligibility Affidavit" on or before your anniversary date, June 17, 2021. The affidavit must indicate any changes or no changes in your firm pertinent to your certification eligibility. The submittal of a "Continuing Eligibility Affidavit" annually with specific supporting documents on or before your Anniversary Date is required to maintain the three-year certification. You will be notified of this responsibility in advance of the Anniversary Date. Failure to comply with the said responsibilities may result in immediate action to decertify the firm. If at any time there is a material change in the firm including, but not limited to, ownership, officers,. director, scope of work being performed, daily operations, affiliations) with other businesses or the physical location of the firm, you must notify this office in writing within (30) days. Notification should include supporting documentation. You will receive timely instructions from this office as to how you should proceed, if necessary. This letter will be the only approval notification issued for the duration of your firm's three years' certification. If the firm attains graduation or becomes ineligible during the three-year certification period, you will be properly notified following an administrative process that your firm's certification has been removed pursuant to the code. Your firm's name and tier level will be listed in the directory for all SBE cert ified firms, which can be accessed through Miami -Dade County's SBD website: http://www.miamidade.gov/smallbusiness/certification-lists.asp. The categories as listed below affords you the opportunity to bid and participate on contracts with Small Business Enterprise measures. It is strongly recommended that you register your firm as a vendor with Miami -Dade County. To register, you may visit: http://www.miamidade.gov/procurement/vendor-registration.asp. Thank you for your interest in doing business with Miami -Dade County. If you have any questions or concerns, you may contact our office at 305-375-3111 or via email at 5bdcert@miamidade.gov. Sincerely, Claudious Thompson, Section Chief Small Business Development CATEGORIES: (Your frm may bid or participate on contracts only under these categories) MDC -TCC 04-02: ARCHITECTURAL DESIGN MDC -TCC 14: ARCHITECTURE MDC -TCC 18: ARCHITECTURAL CONSTRUCTION MANAGEMENT MDC -TCC 22: ADA TITLE II CONSULTANT NAICS 541310: ARCHITECTURAL SERVICES �C,HOOLD/S� THE SCHOOL DISTRICT OF DICKY SYKES,M.Psv. PALM BEACH COUNTY, FL DIRECTOR OFFICE OF DIVERSITY IN BUSINESS PRACTICES y�A 3300 SUMMIT BOULEVARD <M BEACH [oa WEST PALM BEACH, FL 33406 PHONE: 561-681-2403 / FAX: 561-434-7405 WWW, PALMeEACHSCHOOLS.ORG/DWERSITYIN BUSI N ESS May 7, 2020 RODRIGUEZ ARCHITECTS1 INC. 2121 PONCE DE LEON BLVD, #1010 CORAL GABLES, FL 33134 Attention: LOURDES RODRIGUEZ RE: Temporary SBE Congratulations Letter &Certificate WANDA F. PAUL, M.ED., MBA CHIEF OPERATING OFFICER Congratulations! Please find enclosed is your School District of Palm Beach County, Small Business Enterprise (SBE) Certificate. A copy of this SBE certificate letter must be included in all proposals or bids that your firm participate on as a prime or subcontractor. Your firm is certified as a Small Business Enterprise (SBE) between April 27, 2020 -April 26, 2023 under the following Codes. NIGP CODES: 9p6op, 90607, 90610, 90625, 91800, 91825 DESCRIPTION: Architectual Services, Architect Services, Professional., (Not Otherwise Classified), Including Consulting, Buildings, Architectural Design Services, Design Build, Architectural Services, Compliance Consulting, Including American Disabilities Act (ADA) Permanent Certificates will be automatically updated and emailed to applicants upon return to our SDPBC Offices. If we can be further assistance to your firm, please feel free to contact the ODBP at (561) 681.2410. Sincerely, Heidi Galloway- Intentionally left without Signature Temp Certificate Analyst Business Compliance &Outreach Office of Diversity in Business Practices School District of Palm Beach County Ph: (561)681-2410 Fax: (561) 434-7405 E -Mail: Heidi.Galloway(o)palmbeachschools.org The School District ofPalm Beach County A Top High -Performing A Rated School District An Equal Education Opportunity Provider and Employer RODRIGUEZARCHITECTS, INC. AAC - 001933