Loading...
HomeMy WebLinkAboutCalvin, Giordano & Associates, Inc.City of Sunny Isles Beach Government Center Attn: City Clerk 18070 Collins Avenue Sunny Isles Beach, FL 33160 Continuing Professional Consulting Services (CCNA) RFQ No.: 20-07-01 Due Date and Time August 18, 2020 at 2:30 PM Electronic Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Prime Firm: Calvin, Giordano & Associates, Inc. Due Date and Time: August 18, 2020 at 2:30 PM Primary Contact Jenna Martinetti, PE Project Manager JMartinetti@cgasolutions.com Address: 1800 Eller Drive Suite 600 Fort Lauderdale, FL 33316 Telephone No.: 954.921.7781 1 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA) TABLE OF CONTENTS Tab A - Title Page .......................................................................................................................................1 Tab B - Table of Contents ..........................................................................................................................2 Tab C - Cover Letter and Executive Summary .........................................................................................3 Tab D - Project Approach and Understanding .........................................................................................6 Tab E - Qualification Information and Assigned Personnel ..................................................................22 Tab F - Firm References and Similar Work Completed .......................................................................235 Tab G - Corporate Standing and Authorized Signatory .......................................................................240 Tab H - Forms and Attachments ...........................................................................................................243 City of Sunny Isles Beach - Pedestrian Park Bridge Feasibility Study 2 TAB C City of Sunny Isles Beach - CEI Bridge cover letter and executive summary 3 4 5 TAB D project approach and understanding City of Sunny Isles Beach 6 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA) Tab D - Project Approach and Understanding Calvin, Giordano & Associates, Inc. (CGA) is pursuing the following work categories: • Civil Engineers • Electrical Engineers • Surveyors and Mapping • Environmental Engineering • Construction Engineering and Inspection (CEI) Services Below is a table below of the services CGA will be providing along with the Project Manager for each service and their contact information. The Overall Project Manager/Point of Contact for this RFQ will be Jenna Martinetti, PE. Categories Project Manager Contact Information Civil Engineers Jenna Martinetti, PE JMartinetti@cgasolutions.com Tel: 954.921.7781 Electrical Engineers Jorge Cervantes, PE JCervantes@cgasolutions.com Tel: 954.921.7781 Surveyors and Mapping Steve Watts, PSM SWatts@cgasolutions.com Tel: 954.921.7781 Environmental Engineering Sandra Lee, AICP CEP, CFM, LEED AP BD+C SLee@cgasolutions.com Tel: 954.921.7781 Construction Engineering and Inspection (CEI) Services Erik Padron, PE EPadron@cgasolutions.com Tel: 954.921.7781 On the following pages, you'll find project approach and understanding for each category that CGA is pursuing. 7 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA) CGA’s general approach on design, development, and construction related projects are outlined below. Variations will occur depending on the requirements of a particular task order. Project Scoping: Upon receiving notification of a potential project, CGA’s Project Manager (PM) will meet with the City’s Project Manager to determine the project scope, schedule, budget and other requirements of the project. The PM will brief the CGA project team and begin to conduct project scoping requirements. Due diligence will be performed before preparing a conceptual sketch or a letter of understanding for the City’s review and concurrence. Due diligence may include, but will not be limited to: • Reviewing City’s Ordinances, if requested; • Reviewing the Manual on Uniform Traffic Control Devices (MUTCD) and Florida Department of Transportation (FDOT); • Researching and obtaining available documents such as existing permits, records and R/W information; and • Site visit to understand any project constraints and challenges. Task Order: Once the project scope and area have been agreed upon, we will then prepare a task order document. This document will include a description of the project, to include but not limited to: • The scope of services to be performed; • Schedule of professional fees; • Labor matrix; • Critical path schedule; • Preliminary engineer’s opinion of probable costs; and • List of key project team members with their roles and qualifications for working on that particular project. Project Commencement / Kick-off Meeting: All task orders will begin with a Project Kick-off Meeting, during which the CGA project manager (PM) will meet with the appropriate City staff. The project manager will then assemble the project team required for the task at hand. The tasks of the project will be outlined at the “Kick-off Meeting.” The team will be introduced to the scope, the budget and the timeline, and the PM will define the various elements of the project and the quality control/quality assurance requirements at this meeting. The project manager will regularly review the status of the project to ensure that the CGA Team is meeting the project’s schedule and budgetary requirements as initially defined, and update the client of the project’s progress. Fieldwork: For task orders involving the analysis of existing conditions, the design of proposed improvements, or management of ongoing work, CGA will perform a site field review. Depending on the nature of the task order, this may include observations of the site, traffic data collection, topographical survey, Environmental Assessment and/or a survey of existing structures. In most instances, CGA’s familiarity with the City can expedite this process. Utility Coordination: For any task order that involves design, review or project management of proposed improvements, CGA will coordinate with the various utility companies to determine the location of existing and future planned utilities. In certain projects, this will also entail coordination with US Utility Potholing & Air Excavation (USPAE) to complete Subsurface Utility Investigation investigation. This data will be included on any right-of-way and design survey and will be used throughout the design, review and project management process. Project Approach and Understanding - Civil Engineers 8 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA) Stakeholder Input: Depending on the specific project, it may be desirable to engage and include stakeholder input early on in the process to obtain buy-in from those individuals most impacted by the project. Schematics, aerial images, and renderings allow for input on the plan to meet the needs and requests made by stakeholders. When requested, CGA can also utilize our interactive resident voting devices to obtain quick and effective input from residents. Preparation of Preliminary Deliverables: CGA will prepare preliminary plans and technical memorandums. These documents and specifications may include the following items as needed: • Environmental analysis; • Preliminary site plans; • Preliminary planting plans; • Preliminary building plans; • Preliminary roadway and drainage design plans; • Pedestrian Studies; • Access Management Studies; • Drainage Review; • Geotechnical Investigation; • Preliminary Utility Alignments; • Intersection lane analysis; • Lighting justification report; • Recommended typical cross section(s) for proposed roadway improvements; • Layout of signalization improvements; and • Preliminary structural analysis and plans. These documents and specifications will be submitted to the City for review, comment and approval. Preparation of Plans/Deliverables: CGA will meet with City representatives and receive comments on the preliminary submittals. Following the meeting, our team will prepare a written response to the design comments, make appropriate changes and continue to the 60% and 90% completion level. The 60% and 90% design documents will then be submitted to the City for review, comment and approval. Permitting: After receipt of the City’s input at the 30% drawings, CGA will conduct preliminary meetings with the Agencies Having Jurisdiction (AHJ). After the 60% plans have been reviewed and approved by the City, permit applications will be made to the appropriate agencies. CGA will utilize our long-term relationships with the staff at the AHJs to follow up and expedite all permit approvals. 9 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA) Preparation of Final Plans/Deliverables: CGA will meet with representatives of the City to receive their comments on the 90% plans submittal. Following the meeting, CGA will prepare a written response to comments, make appropriate revisions and complete the preparation of the deliverables as defined by each task order to include: • Technical specifications; • Bidding documents; and • Final construction plans in accordance with the City standards. These plans, specifications, and bid documents can be used for the solicitation of competitive bids for the construction. Bidding / Award / Notice to Proceed: When the scope of work requires a competitive bid process, the CGA Team will assist the City with the bid management process to include: • Advertisement; • Pre-bid meeting; • Response to bidders questions; • Preparation and issuance of addenda; • Evaluation of bids; and • Preparation of a recommendation of award for the construction contract. Construction Administration/Engineering Services During Construction: CGA will provide the necessary support to provide construction administration services to respond to RFIs and review shop drawings. We will undertake the required field inspections, contract administration, project certification and project coordination. We are committed to provide expert field inspection services such as: • Contract negotiation • Implementing quality control and assurance programs • Contract document review • Shop drawing review • Administration of contractor RFIs • Observation of field activity to assure construction is completed in accordance with construction documents • Payment request recommendation, change order administration • Environmental and NPDES monitoring • Field report and documentation • As-built record drawing preparation • Agency/permit closeout documentation and certification Task Order Closeout: Once all tasks have been completed, the Project Manager will work with the City’s representative to close out the task order, including the punch list process, and closing out all required grant applications and open permits. 10 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA) The proposed approach for a lighting project will consist of a five-step process involving: (1) Night-time assessment and documentation of existing conditions; (2) Preliminary design and fixture selection; (3) Design development; (4) Final Design; (5) Engineering support during bidding and construction phases. A. Night-time assessment of existing conditions: In any lighting project, one of the most important steps is to understand the current conditions for the given site. The proposed night-time assessment will allow the engineer to observe the current lighting conditions and determine any problem areas, impacts of physical obstructions such as trees, and the overall quality and appropriateness of the existing lighting facilities. The engineer will take readings with a calibrated light meter throughout the areas of interest (typically at 10’ to 20’ intervals) that will later be compared to the photometric software simulation results of the same areas. The results of the night- time assessment will be utilized to create an existing conditions site photometric plan. The observed vs. simulated data comparison is important because it provides a realistic picture of the lighting conditions by emphasizing the effect of actual obstructions that are, typically, not accounted for in the photometric software simulation alone. This allows the engineer to ascertain the site areas and lighting system elements that will require additional attention in the design process. B. Preliminary design and fixture selection: The focus of the preliminary design approach will be to utilize the existing poles at the site, if desired and possible, and consider light fixture retrofit options using Light Emitting Diode (LED) technology. The advantages of LED technology include lowered energy consumption, longer fixture lifetime (lowered maintenance / re-lamping costs), and improved lighting performance via perceived and verifiable results. If their will be a high level of pedestrian traffic through the project area, LED fixtures with vandal resistant features may be the preference. In addition to the conventional pole-mounted fixtures, the incorporation of bollard lighting may be an option for some projects. This type of lighting will be beneficial in areas of extreme canopy cover where much of the light from the primary light poles is being blocked. The goal of the preliminary lighting design will be to meet security lighting standards as defined by the Illumination Engineering Society of North America (IESNA) as well as any local ordinances regarding light levels and lighting spillover at the property line. Our electrical engineering staff will provide photometric simulations with the various LED fixtures selected for consideration and will work with the staff to review the results and assist in making a decision on the best possible fit for the project. C. Design development: Once the appropriate fixture (or set of fixtures) has been chosen by the City, the engineer will update the design and perform the load calculations and circuiting design for the project. The electrical power distribution source will be reviewed and discussion with FPL will begin. For the lights to be retrofitted, the engineer will determine the adequacy of the existing wiring to support the revised loads. For lights that will require new poles, the electrical feed will be sized to handle not just the presently proposed lighting loads, but also any future lighting enhancements that may be desired. Coordination with other disciplines involved in the project must occur during this phase to make sure any proposed light pole locations are coordinated with proposed landscaping, do not impact ADA access or improvements, and power requirements are coordinated. Project Approach and Understanding - Electrical Engineers 11 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA) D. Final Design: Once the design is substantially complete, the electrical engineer will have a final design review meeting with the City and project team to go over all of the details of the project and make any required final adjustments. This may include a site visit to examine proposed pole locations, trenching paths, review of any subsurface utility investigation (soft dig) information, and evaluate any potential conflicts with existing or future facilities. The final set of plans shall include electrical notes and specifications, electrical site plan, electrical riser diagram, electrical details for the proposed equipment and pole modifications, photometric site plan and a set of structural plans and calculations to confirm compliance with all applicable windloading requirements including the current edition of the Florida Building Code and Broward County High Velocity Hurricane Zones. E. Engineering support during bidding and construction phases: During the bidding and construction phases of the project, our electrical and construction engineering staff is well accustomed to providing in-depth support to the project administrators. Whether responding to RFIs, assisting with contractor building department questions, issuing clarifications of the contract documents, reviewing shop drawings, attending construction progress meetings, or performing construction inspections, our staff will always be ready, willing, and able to play a significant role during the bid and construction phases. Our experience has been that the most successful projects are those which have a high level of engineering involvement and support during the bid and construction phases – this would be our targeted approach to this project. This approach tends to create a ‘team’ mentality where all of the players involved become actively engaged in accomplishing a common goal – the successful completion of the project. In addition, since CGA is committed to unmatched customer service and satisfaction, we make it a priority to provide quick and effective responses to all client correspondence or requests – thereby emphasizing our appreciation, respect, and commitment to the client. The overarching goal of our consulting approach is to build a seamless relationship with the client that is based on open and effective communication – a relationship driven by teamwork, cooperation, and common goals. The approach to projects requiring electrical engineering support for proposed buildings, treatment plants upgrades, irrigation controllers, and proposed pump stations for stormwater, water, and wastewater is similar to the above approach; however, the existing systems would be reviewed in a site visit with City staff to determine what upgrades are needed in order to support the proposed improvements. The electrical engineering design is reviewed during the quality control review process with any other involved disciplines to ensure the construction documents are coordinated. 12 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA) Surveyors and Mapping As CGA has and continues to provide professional surveying and mapping services to various municipalities in the South Florida region, we have a vast amount of knowledge and experience in the municipal consulting field. We have assembled a team of qualified surveying professionals who have completed numerous surveying projects of similar scope, who possess the diversity of technical skills required for successful completion of any task within this project and who have the full understanding of the requirements and intricacies of completing surveying projects in the City of Sunny Isles Beach. The team is fully committed to dedicating the necessary manpower, expertise and attentiveness to ensure the City meets its objectives through the provision of these services. In general, CGA's approach to the Surveying Scope of Services is outlined below. Initial City Request – Upon receipt of the City’s request, the CGA Survey/Mapping Project Manager (SPM), Steve Watts, PSM, will hold a phone conference or in-person meeting to compile a project information package from the City. Part of this stage is to identify the specific survey request, as well as what the desired intent is of the survey project. For example, a construction layout survey that will progress into a full ALTA|NSPS Land Title Survey of the site may require a different layout of survey control versus one that just has a stakeout component. It is at this stage that the groundwork is laid for a successful survey that will allow our team to determine the complete scope of work, required schedule, budget and final deliverables at the onset of the project. Project Research – Prior to any mobilization of field crews, Steve will complete the necessary due diligence of the information gleaned from the Initial City Request stage. This includes a search of the public records including the Miami-Dade County Property Appraiser’s office; Clerk of the Court; Miami-Dade County Section Maps, City of Sunny Isles Beach information and NGS websites together with any Google street view type applications. This upfront research assists in identifying property boundaries, easements and/ or other encumbrances that may exist on a specific parcel. From this research, a survey field map will be generated identifying survey traverse control points together with any found property and/or right-of-way monuments within the area. Utilizing the County Parcel GIS map, CGA will upload property corner search ties which are referenced to state plane coordinates directly into our GPS data collectors. This process allows field crews to navigate directly to a possible corner location within centimeter accuracy. Utilizing this process enables us to perform the same type of location for buried valves, manholes or other type of as-built infrastructure referenced to state plane coordinates. Project Schedule and Budget – Most survey projects have a total project length from Notice-to-Proceed to final survey deliverable of less than 3-4 weeks. Upon receiving the initial survey/mapping request and due diligence is completed, CGA will immediately prepare a man-hour estimate and crew schedule to complete the survey tasks within the critical path timeframe. Any survey projects of size and complexity that require a more substantial timeframe to complete (3-4 month survey project). CGA will coordinate this schedule with the City to obtain feedback on both the schedule and proposed budget. Team Communication – The Project Team will hold weekly or more frequently if needed, meetings to discuss project status, updates, issues and resolutions to issues. CGA will maintain constant communication with the City and will provide status updates as the project progresses. Project Approach and Understanding - Surveyors and Mapping 13 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA) Final Deliverables – Prior to issuance of any final deliverables to the City, the survey information and data backup will be routed through the CGA QA/QC process to ensure the City is provided with a fully accurate survey document, that is in compliance with all City, County and State land surveying requirements. Extension of Staff CGA will work with the City of Sunny Isles Beach as an extension of their staff by keeping open communication via emails, phone calls and frequent status/progress meetings. Upon assignment of the project, CGA’s Project Manager, Steve Watts, will have a kickoff meeting with City staff to review the tasks required, the approximate schedule, budget and staff requirements for the project. CGA will request that staff provide any as-built information, previous project surveys or construction plans on site or adjacent to the project. Upon completion of due diligence, CGA will provide a detailed surveying scope of services for staff to review and approve. Once a Notice-to-Proceed has been issued, survey crews will be on-site within days to perform data collection. City staff will be updated as to project progress, schedule and completion date throughout the duration of the project. Issues or Concerns of Significance We believe the issues or concerns in relation to this project is that as advances are made with respect to highly technical RTK GPS and 3D Scanner survey equipment that it is even more imperative that the City’s consultant understand the capabilities, but also the limitations of such equipment. Our experienced staff has been through the pratfalls of the various issues with this type of equipment and have the knowledge of when to use this type of equipment but more importantly know when not to use it based on the specific survey task. Advanced Survey Equipment Some of the most state-of-the art surveying equipment that exists today is part of our inventory. The Leica ScanStation C10 is a 3D Laser Scanner which enables us to develop high definition surveys for such applications as water and wastewater treatment plants, pump station rehabilitation, facilities management inside of buildings and a multitude of other survey projects. As CGA is a full-service consulting company providing civil engineering, landscape architecture, GIS and land planning services, the survey department is well versed in providing detailed and accurate surveying data for engineering projects relating to water distribution systems, storm drainage and sanitary sewer infrastructure. As CGA is one of the few South Florida consulting firms to have a full-scale GIS department providing data population and application development for a number of government entities, the survey department has developed capabilities to provide efficient field data collection for rapid download into GIS databases. Using Trimble Real Time Kinematic (RTK) GPS equipment with Blue Tooth wireless technology and tied into the Florida Continuously Operating Reference Stations (CORS) allows us to collect vast amount of data referenced to the latest horizontal and vertical datums as established by the National Geodetic Survey Department (NGS). Having a sophisticated IT department working in conjunction with the GIS and Survey departments all under one umbrella, enables data transfer and database entry from remote locations seamlessly. Issues that plague large GIS\Survey projects regarding incompatibility between field and office, software application to software application are non-existent at CGA. 14 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA) Calvin, Giordano and Associate’s (CGA) has developed a broad environmental service base to fully understand and serve all the needs of our clients, and to fully address all natural resource considerations. Our diverse and in-depth work experience has provided us with a critical understanding of current environmental planning and permitting issues, and the historic impacts that have affected our natural resources. The integration of our highly technical field skills, in-depth knowledge of regulatory details and overall project requirements allows us to efficiently address project needs from inceptions to completion. CGA environmental staff stays current on regulatory updates and has also built long-lasting relationships with the regulatory agencies. Our environmental staff is skilled in addressing considerations in pristine natural resource settings to urbanized settings, both benthic and terrestrial, and the natural resource features unique to your coastal barrier island community. CGA has long provided municipal contract service in diverse settings and structures and knows how to maintain effective communication, to be a valuable asset to your City, and to efficiently and effectively implement your projects, your goals and your vision. It is our practice to work closely with your Staff. Upon being awarded a project by the City, CGA will meet with the City to determine and confirm the specific requirements of the project, the City’s timeline, coordinating partners, chain of contact, deliverables, and what supporting elements the City may be providing. Anticipated or potential project challenges will be discussed and identified at this meeting, such as external agency technical coordination in permitting that may require extended time frames for completion, or imperiled species surveys that can only occur in limited time windows. CGA will establish our project staffing needs, the appropriate sequencing of work including those tasks that can run concurrently, and a progress schedule. Ongoing, CGA will continually review the progress of the project to assure meeting the projected timeline and budget as approved by the City. The CGA project manager will maintain close communication with each team member and any coordinating partner(s) and will periodically update the City of the project progress. As scheduled, or requested by the City, the CGA project manager will provide deliverables in the format(s) specified by the City. Any adjustments due to circumstances such as changing conditions or change of the original scope occurring throughout the duration of the project will be reviewed with the City and adjusted as necessary upon City approval. All permitting should run concurrently and optimal sequencing for environmental permitting includes: • Identifying all required jurisdictional agencies and organizing and attending pre-application meetings with them, • Conducting the necessary site inspections to collect the field data required to document the existing natural resource conditions and potential for impacts to sensitive habitats in submerged lands, shorelines and adjacent uplands with the implementation of any proposed project, • Preparing the environmental documents, analyses, and other environmental submittal information for inclusion in the application submittal packages, • Coordinate with engineering and other team members to obtain all other required submittal documents and plans for inclusion in the submittal packages, completing applications forms, obtaining signatures and checks, and submitting application packages to the agencies, • Coordinate and attend meetings, post submittal, each with each of the permitting and commenting agency, and • Immediately responding to any request for additional information. Successful project implementation requires diligent oversight, documentation and follow-up; as well as ongoing clear, concise communication with the City and other project partners. CGA’s staff is experienced and highly skilled in the services required of by this RFQ and has adequate availability in their existing workload to undertake the City’s scope of work and maintain the high standards of deliverables the City and CGA are accustomed to. All of our projects adhere to a strict project management system, wherein we weekly ensure that milestones are met and risk management is averted, by addressing the anticipated staffing needs of each project and matching those needs with the most capable resources. CGA has been able to accommodate its workload, while keeping our mantra of personalized attention combined with responsive solutions for each and every client. Additionally, CGA has the experience and in-house resources to seamlessly cover almost any eventuality that is encountered. Project Approach and Understanding - Environmental Engineering 15 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA) Below you will find a brief synopsis of critical items of interest that we follow for ALL our Construction Engineering & Inspection (CEI) projects, pertaining to each scope of work to be completed. Roadway Construction and Maintenance projects: Our proposed staffing is Construction Training Qualification Program (CTQP) certified in earthwork (1 & 2), asphalt paving (1 & 2), ACI (1 & 2), drill shaft, pile driving, IMSA, final estimates (1 & 2), and QC manager as well as many others. Asphalt and Paving: The team proposed by CGA is certified and has extensive experience with milling, resurfacing, roadway reconstruction, earthwork testing, utility adjustments and pavement markings. The team will hold a pre-paving meeting to review the specifications and plans requirements to ensure compliance with contract documents. Review the asphalt QC plan prior to paving, temperature testing is performed, asphalt tickets collected, milling depth checked, cleanness of milled surface prior to tack application, track asphalt and tack application rates, quantities and ensure QC logs are submitted within 48 hours. Perform cross slope checks and a rolling straight edge to ensure compliance with the Florida Department of Transportation (FDOT) ridability requirements, noted deficiencies will be corrected. All VT tests will be sampled and tested by the CEI team and performed at the same frequencies listed in the FDOT standard specifications. Ensure contractor uses track-less tack. CGA understands the industry’s latest challenges with “tack balls”, raveling and the use of non-electronic paving machines. The Senior Project Engineer (SPE) or the Project Administrator (PA) will be present on the field during the paving operation to identify issues early and implement corrective measures. Contractor’s paving machines, checked daily and the CPPR process followed. Earthwork: Ensure that all proper testing is performed, specialized spreadsheets will be used for tracking of the earthwork quantities, proper documentation in the density log book, and verification of cross sections are the most major issues related to earthwork on the project. De-mucking is another critical operation that can impact time and cost on a project. Proper tracking of quantities, ensuring complete removal of the muck and proper disposal are key issues. CEI team and the contractor will agree on cross sections prior to backfilling to avoid delays and claims. The PA will perform QA checks on the Density Log Book on weekly basis, conduct a preearthwork meeting, three way calibration test and material source verified. Drainage: Our team will conduct a pre-activity meeting prior to construction to discuss the contractor’s approach and the requirements set forth in the contract plans, the FDOT standard specifications and the FDOT standard index. Timely submittal and review of shop drawings will be critical expedite the material procurement process and help expedite construction. Ensure that all filter fabric, bricks, mortar and coarse aggregate is certified and sampled prior to the installation of any drainage structures. Adherence to elevations is essential to ensure proper drainage. Ensure proper stamping and certification of drainage structures prior to submittals and installation. No structure will be installed without submittal of delivery ticket and proper certification. Project Approach and Understanding - Construction Engineering and Inspection (CEI) Services 16 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA) Bridge Construction: SPE will hold a pre-concrete activity meeting to go over the concrete placement and curing requirements. Contractor’s concrete QC plan will be reviewed in detail along with pile installation plan, pile support and erection plan, crane specs and pile hammer specs. A pre-pile installation meeting will include geotechnical engineer and representatives from materials lab to review the specification and plan requirements. Sr. bridge inspector will inspect pile support erection and welding. The geotechnical engineer will administer test pile installation and will provide a letter with driving criteria. We will administer pile installation, curing of deck using the continuous moisture curing, steel mat inspection, vibration during concrete placement enforced to eliminate any honeycombing. Pre-activity meeting prior to installation of expansion joints, expansion joints will be constructed after deck grooving to avoid damaging them. Our team will use boats to perform an under deck inspection. The PA will coordinate with the FDOT District Bridge Inspection team to schedule the 90% and the 100% inspection. The contractor will have to submit the bridge load rating prior to the 100% inspection. Signalization and Lighting: Ensure expedited submittal and review of the signalization and lighting shop drawings and reviewed for compliance with project plans, MUTCD, FDOT Standard Index and County Specifications. Once approved, we will coordinate the pre-lighting and pre-signalization office and field meetings with the County, City, Florida Power & Light (FPL) (if needed), and contractor. Then meet in the field to establish locations of new load centers if any proposed. It is critical to coordinate with FPL in advance to ensure that the contractor isn’t delayed. Signing and Pavement Markings: Materials certifications submitted prior to the installation of final pavement markings. All materials certifications will be reviewed for conformance, thermoplastic layer won’t be applied until 14 days after placement of asphalt. A pre-sign installation meeting conducted prior to construction, and then we will conduct a thorough detailed review of signing and pavement marking plans prior to construction and provide comments. We will perform sign panel inspection for conformity of the contract requirements regarding reflectivity, air bubbles, and message on the sign. Utility owners will be contacted a week in advance, to avoid conflicts with sign installation. Utilities: We will begin by reviewing the utility work schedule to create a map of all the utility work that is required on this project, all utility owners invited to pre-construction meeting and obtain status update on utility work especially work required to be completed during construction. Environmental Requirements: Construction activities restricted to the limits shown in the plans, silt fence will be installed, grates wrapped in filter fabric and all curb/gutter and curb inlet sediment barriers are installed as per the standard index. Usage of private properties will not be allowed without a written agreement between the contractor and the private property owner. The staging area will be coordinated, reviewed and approved by all stakeholders prior. SPE will review all permit requirements and share requirements with the contractor to ensure compliance. 17 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA) Landscape Inspection (If needed): Before construction site inspection to see if any trees / palms will be impacted and any root pruning must be done. Meeting with County Landscape Inspector on expectations. During construction, take soil samples, nursery visit with contractor to tag plant material, Florida Grade #1, or better to ensure minimum requirements met. Ensure shop drawing submittal of fertilizer, staking/ guying, soil, pre-emergent herbicide, mulch and sod. Document Control and Warranty: Our personnel will strive to maintain legible, complete, properly indexed/archived, and retrievable documents. We are committed to utilize the latest software, our staff will also work with your in-house staff to ensure that all warranty information is collected; tracked and periodic inspections conducted to ensure the County received the full value of these improvements. The incorporation of the value added specification stipulates the inspection frequency for each incorporated element and we will ensure that all relevant information is entered into the County’s database system. Our team will coordinate all the warranty requests between the County and the contractor, we will perform the periodic inspections during the life of our contract to determine the corrective action for each deficiency, and we will notify the contractor in writing of the items covered by the warranty that require corrections. Resident Compliance Support (RCS): We will monitor and maintain files to comply with the Federal and State rules and regulations concerning the compliance program. We will maintain our constant lines of communications with the County or FDOT resident compliance manager to ensure the expedited flow of information between the team, County, and FDOT. We will conduct a pre EEO/OJT/DBE meeting with contractor and County or FDOT representative to revive the compliance requirements listed in the contract. Including Davis Bacon Act, payroll format, classification and pay information, interviews with the contractor’s staff to verify that the information provided in the payrolls are accurate. Non- compliance letters will be issued as needed for any compliance violation. Our RCS will monitor the on- the-job training (OJT) program for compliance with the EEO handbook and contract requirements. During Substantial Completion Walk-through: 30 Days prior to completion of project, we will meet with Contractor, County Project Manager and our staff and walk entire site to make note of deficiency’s. We will then generate a punch list excel sheet. As each item is completed and/or fixed, our inspector will date and comment on the completion of the item. After all items are complete and confirmed by our inspection staff prior to last day of contract, we will have a final walk-through with the County Project Manager, CEI staff (PA, SPE, inspection staff), FPL (and/or other designated utility company), City (if needed) and Contractor. Quality Assurance (QA): CGA will incorporate our QA Checklist with the current Final Estimate Submittal checklist Performs thorough review and oversight of the Quality Control (QC) density log book by verification personnel to minimize errors and potential delay to the final material certification. • Perform bi-weekly reviews of material testing results to ensure resolution of open samples, failing test results and missing QC and/or verification information. • Generate and submit an accurate and timely Final Offer Letter within 30 days of Final Acceptance. • Maintain current and accurate records of field changes and plan revisions for the preparation of the as-built plans. • Ensure that Maintenance of Traffic Plans are in accordance with the MUTCD and that one lane of through traffic is maintained throughout the whole project limits. • Continue to keep the residents, hospital, school and businesses of the immediate area apprised of all construction phasing throughout project duration. 18 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA) JOB SITE CONTROLS REGARDING DAMAGE TO EXISTING INFRASTRUCTURE ADVERSELY AFFECTING NEIGHBORING PROPERTIES AND/OR OCCURRING AFTER BUSINESS HOURS Public Information Outreach (PIO) and coordination: PIO coordination will be a major activity that will require special attention by the CEI team. Prior to project start date we will note if private property owners have signs, lighting, landscape, and other items that will be impacted during construction. One of the things we do prior to any work being done. Pre-activity video and photos • Note any damage to properties with video and photos prior to construction. Flyers Prior to any construction being done, we have a project representative walk door to door and hand out flyers to affected residents and businesses. Information will include: • Work that is being done, time frame, phasing, who will be affected during specific dates and when project is slated to be completed • 3 points of contacts: • 1st Point of Contact: Contractor Project Manager (available 24 hours a day) • 2nd Point of Contact: CEI PA and/or SPE (available 24 hours a day) • 3rd Point of Contact: County Project Manager • This flyer comes in handy when any neighboring properties are affected / damaged during construction activities. • Flyer for asphalt paving operations two (2) weeks prior to affected residents and businesses and other major operation flyers, such as drainage improvements or road closures that residents need to be informed two (2) weeks prior to any work being done. • We also encourage contractors to run each individual property owners irrigation prior to any work being done to ensure no damage is being done to their existing irrigation systems. It is very important for the flyers to go out prior to construction so that if something happens after hours or during the construction day, residents and business know whom to call. CEI is a 24-hour day business in case any emergency arises. We recently completed a project for the City of Coral Springs, NW 110th Avenue Streetscape. Residents who received a flyer called our PIO representative, who was able to answer any questions or concerns about the streetscape improvements. Other residents called stating an irrigation line was cut during construction activities. We informed City Project Manager, we noted address in our files, homeowner was contacted within 24-hours by the contractor. The irrigation line was then repaired at no cost to the resident. We also had an issue with children breaking a newly planted tree, the residents called our in-house representative from the flyer, we noted the property address and filed it. We then informed the City Project Manager and prime contractor. The landscape subcontractor had the tree replaced within the week. Two (2) Week Advanced Notices: We will coordinate the contractor’s construction with the property owners at least 14 days (2 weeks) in advance to minimize impacts to those owners as much as possible. Mailboxes will have to be maintained by relocating them during construction then replacing them as needed. Projects generally include the reconstruction of many residential and commercial driveways. The driveways will have to be constructed without impacting access to those residents and business owners. The team will ensure that either a temporary access is provided or the driveway construction is performed over two operations to ensure proper access is maintained. Driveway owners will be contacted by the SPE and the PA two (2) weeks in advance of any work impacting their driveway or their access. We will keep the County’s PIO informed of any Maintenance of Traffic (MOT) changes and lane closures. The team will ensure that the lane closure times stipulated in the plans are strictly adhered to by the contractor. Any request to change the lane closure times or allow lane closures on the weekends will be evaluated and discussed with the County in advance. The team understands the importance of coordinating with the different stakeholders to ensure the success of the project. The County, businesses and residents within close proximity to construction will all be coordinated in advance of construction activities. 19 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA) CGA also understands the importance of providing real up to date information to the residents and businesses along the corridor. CGA is prepared to provide door hangers during the initial weeks of the project detailing the CEI contract information and schedule. Our intent is to visit each impacted resident or business owner to ensure they are aware of the proposed improvements, our schedule and potential impacts. Our experiences have proven that an informed and knowledgeable community reduces the number of complaints that each Local Agency will receive – our staff will work as an extension of the County to ensure that all issues are addressed timely with documentable solutions. The team will perform a door to door notification in advance of construction. MANAGEMENT PRACTICE FOR MITIGATING SCHEDULE AND BUDGET OVERRUNS As part of the team’s project cost control system, during the preparation of a task work order, the team will prepare a budget form, which identifies all project-related costs. The budget outline includes assigned personnel, associated manpower and monetary allowances, equipment and direct expenses, overhead, and FCCM. The contract fee is broken down into categories, which are identifiable with activities/ items and sub-consultant services. Once authorized, each task work order is then translated to our accounting system and reflected in our internal progress reports supplied to our clients and is summarized in the task work order tracking spreadsheet. The spreadsheet will be reviewed at our recommended monthly contract update meeting with the County’s CEI Consultant Manager. This will allow us to closely track where the contract’s financial status thus eliminating any contract funding or time issues. These are measures that we use on all our TWO based contracts including the City of Fort Lauderdale, FDOT District IV, FDOT District VI and FDOT Broward Operations Center. CGA’s accounting system has a powerful reporting tool to ensure a tight control of ALL our project budgets. Periodic (Principal-in-charge) reviews (monthly) are performed on ALL project budgets, assigned resources, and associated technical issues to guarantee that the project remains on-track, within budget and that a quality service is being provided at all levels. In addition, Critical Point Reviews of each Construction Budget can be performed on any given project. Historical cost data, as well as, the experience of our personnel are utilized in establishing and controlling construction costs on each of the task work order assignments. Contract Scheduling and Resource Allocation: Project and personnel scheduling are two of the most critical functions to ensure the success of this contract. Being proactive to events, anticipating task requirements and finding timely staffing solutions will be key, to avoiding delays in the execution of any required task. The team will pay special attention to the Technical Special Provisions and Supplemental Specifications for each project to ensure that personnel exceed the experience expectations for the required task. As required per the advertisement for this contract, we have provided a personnel matrix, resumes and qualifications, along with varying horticulture, arborist and landscape architectural licenses and certifications. We will maintain this matrix in a current ‘roster’ format for all our staff and sub-consultants to provide the most qualified personnel when needed by the County staff. 20 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA) Critical Path Method (CPM) Schedule Evaluations: The timely submittal, review and acceptance of a contractor’s baseline CPM schedule is the best indicator of the project’s direction and contractor’s intent. With each assignment, our Project Manager will request a copy of the accepted CPM and updates to evaluate the durations required for our personnel to successfully complete their duties. Our scheduling expertise can also assist in evaluating project schedules for claim analysis and preparation of construction time estimates. JOB SITE SAFETY PERFORMANCE METRIC MOT will be a major focus and point of emphasize to the team and the contractor on your County projects. Ensuring that a proper MOT plan is developed and implemented is essential to the success of our project. Our team is experienced with standard index 600 and MOT inspection. The team will ensure timely submittal if the contractor’s MOT plan. The plan will be reviewed by our team for comments then accepted if it meets the requirements stipulated in index 600 of the Florida Department of Transportation (FDOT) standard index. A copy of the MOT plan will be on site at all times. Our inspectors will ensure the inspection of the MOT on daily basis and will ensure that deficiencies are recorded and addressed immediately. Our main focus will be providing a MOT that facilitates traffic movement in a safe manner during construction. We will ensure that pedestrian access is provided at all times as stipulated in the plans and in the maintenance of traffic-school/pedestrian document. We will ensure that the contractor submits a notice to the County’s special projects coordinator 30 days in advance of construction. The local cities will be notified of any lane closures or MOT phase changes at least two (2) weeks in advance. We will keep the County’s PIO informed of any MOT changes and lane closures. The team will ensure that the lane closure times stipulated in the plans are strictly adhered to by the contractor. Any request to change the lane closures times or allow lane closures on the weekends will be evaluated and discussed with the County in advance. CGA also understands the importance of providing real up to date information to the residents and businesses along the corridor. CGA is prepared to provide door hangers during the initial weeks of the project detailing the CEI contract information and schedule. Our intent is to visit each impacted resident or business owner to ensure they are aware of the proposed improvements, our schedule and potential impacts. Our experiences have proven that an informed and knowledgeable community reduces the number of complaints that each Local Agency will receive – our staff will work as an extension of the County to ensure that all issues are addressed timely with documentable solutions. We will make sure that all driveway owners are notified two (2) weeks in advance of any work impacting their driveways. The mailboxes will be relocated as per plans and the specifications to allow for continuous delivery of the mail. The team will perform a door to door notification in advance of construction. EXPERIENCE WITH THE FLORIDA DEPARTMENT OF TRANSPORTATION (FDOT) CGA is a premier governmental service provider with offices throughout Florida. We have previously provided services to the Department and numerous municipalities on task work order driven contracts since the inception of our CEI Department in 2002, and we have maintained an average grade of 3.8 from our FDOT Contracts. Project Manager, Moe Mabrouk, PE, has both managed and worked under multiple general services contracts with the Department – our team’s management and inspection experiences bring an understanding of your expectations, processes and procedures, which will allow our team to eliminate the learning curve on this project. Previously, CGA won a Task Work Order (TWO) based contract for FDOT District 4 – Contract C9855; General CEI Consultant Construction Support, which lasted from 2012 to 2017, where we provided Project Management and Inspection Services on a variety of Construction Contracts throughout Broward, Palm Beach and the Treasure Coast. Currently, we have two (2) TWO driven contracts with the Florida Department of Transportation; FDOT District 4 – Contract CA052; Broward Operations CEI Consultant Construction and FDOT District 6 – Contract C9O73; Districtwide Misc. Construction Engineering Inspection Consultant. 21 TAB E qualification information and assigned personnel City of Sunny Isles Beach - North Bay Road Pedestrian Bridge 22 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA) COMPANY'S HISTORY AND QUALIFICATIONS Calvin, Giordano & Associates, Inc. (CGA) is a well established multi-disciplinary firm with offices located in Fort Lauderdale, Miami-Dade, West Palm Beach, Port St. Lucie, Estero, and Clearwater. For over 80 years, our firm has been providing consulting services to both public and private sector clients. From the beginning, much of our reputation was built on repeat business with clients from the public and private sectors. Our success is reflected in the quality of work we consistently provide and also in the personal approach we take with each client. The winning combination is affirmed by our large number of repeat/long term municipal clients. Because of our diversity, CGA can control the entire process, offering a host of professional services as a one- source partner, or efficiently tackle time-sensitive individual projects, providing customized solutions with handpicked teams of highly experienced professionals. Custom building Exceptional Solutions is the core of our business. CGA strategically provides a broad range of services to meet our clients’ needs. Our professional services include: • Building Code Services • Civil Engineering/Roadway and Highway Design • Coastal Engineering • Code Compliance • Construction Engineering and Inspection (CEI) • Construction Services • Data Technologies and Development • Electrical Engineering • Civil Engineering • Environmental Services • Facilities Management • Geographic Information Systems (GIS) • Governmental Services • Landscape Architecture • Planning • Project Management • Redevelopment and Urban Design • Surveying and Mapping • Traffic Engineering • Transportation Planning • Water/Utilities Engineering • Website Development Taking advantage of our diversified staff's experience and knowledge is what distinguishes CGA as a professional consultant and what allows our team to repeatedly complete projects on-time,under budget and exceeding expectations while doing so. Serving Municipalities Throughout Florida LOCATIONS Clearwater Estero Fort Lauderdale Miami-Dade Port St. Lucie West Palm Beach FOUNDED IN HOLLYWOOD1937 370 EMPLOYEES Tab E - Qualification Information and Assigned Personnel 23 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA) Please reference SF330 for the following information: • SF330 Section E - Resumes of Key Personnel's experience • SF330 Section F - Projects for CGA's project experience Past Record CGA has extensive experience in providing consulting services on a continuing basis to municipal clients. We are currently under contract with over 60 governmental entities - many for over 20 years - demonstrating that we continually provide sustainable high quality services. Client satisfaction remains our underlying theme and is the most important part of any statement on past performance. CGA has assisted the City with a number of projects in recent years, including Construction Administration of the Newport Beach Pier, Design and Construction Services for the North Bay Road Pedestrian Bridge, evaluation of the this pump station, 174th Street Roadway Improvements, lighting studies at 174th Street and throughout the Golden Shores Neighborhood, city-wide speed studies, traffic engineering services, and engineering plan review services. Financial Stability CGA is a financially stable company with the resources to ensure continued operations throughout the duration of the contract. Size of Work Force CGA maintains a workforce of over 370 professional staff. The workforce proposed for this project is identified in the organization chart and resumes in the SF330 form included at the end of this section. Availability of Personnel CGA has sufficient staff to support the projects under this contract because we serve as municipal staff, and in keeping with our reputation of being promptly responsive, we ensure that availability of our staff never goes below 40 percent for our senior staff and 30 percent for our technical support staff, amending our staffing needs as necessary. This is a strategy that we maintain to allow us to meet the impromptu and unexpected demands of all of our clients without sacrificing the needs of others. CGA guarantees that we will have the necessary staff to meet all the needs no matter what they are. Local Permitting Experience CGA has extensive experience and knowledge in all applicable federal, state and local codes, laws and regulations. In our capacity for providing engineering services to many local agencies in Miami-Dade and Broward Counties, our experience and familiarity with regulatory agencies plays a major role during the project approach, design, and permitting phases to allow for a more well-coordinated and smoother permitting process. CGA has been responsible for ensuring that all codes are met and addressed prior to permit submittal, which leads to a reduction of agency comments and limits any project schedule interruption. We have been a part of countless projects and continuous communication efforts with regulatory agencies for all aspects of design. Our familiarity with permitting related to infrastructure projects, specifically in Miami-Dade County, can be demonstrated by listing the applicable regulatory agencies and pertinent codes/criteria which are anticipated to be encountered during the permitting phase of services. • City of Sunny Isles Beach Building Department - Dry Run during design • South Florida Water Management District - Dewatering Permit and Environmental Resource Permits • Army Corps of Engineers - Environmental Resource Permit (if work in the intracoastal is needed) • Florida Fish and Wildlife Commission • Miami-Dade County Department of Environmental Resources Management (DERM) • Florida Department of Environmental Protection (FDEP) Underground Injection Control Well Permit • Miami-Dade Public Works Department of Transportation (MDPWDOT) • Miami-Dade Water and Sewer Department (WASA) • Miami-Dade Transit (MDT) Performance Records CGA has an exemplary record of performance with each of its contracts. Company-wide, CGA has never had a contract terminated or canceled for cause. The key to effective performance is assigning the right person for the job. The CGA Team represents a highly qualified and experienced professional staff with almost every required discipline in one location. In order to maximize employee utilization and therefore performance, CGA utilizes an accounting software, Ajera, to track not only project budgets, but also employee workloads. In an effort to maintain the highest standards, our team receives continuing education to stay on top of the latest industry standards and processes. Through formal training, seminars and in-house technical sharing sessions our staff is kept abreast of ever-changing methods and technology. 24 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA) On Schedule and Within Budget We have enlisted the most appropriate leader, Jenna Martinetti, PE, and the best available team members to ensure that the most economical and technically sound projects are delivered to the City on time and within budget. We accomplish this by keeping the channels of communication open among CGA’s team members and supplementing with regular in-house team and client progress meetings. Additionally, monthly status reports are submitted to the City’s PM. This helps ensure that project milestones are being met as planned as well as keeping the City ready to answer any commission, resident or business owner questions. Frequent communication among the City and the projects manger also allows CGA to closely monitor project progress, budgets and schedules. We use progressive communications tools to keep in contact as various team members undertake different tasks each day. The full suite of project administration software (Ajera) is used by CGA’s staff. Whether it is time and budget tracking, or monitoring schedules and task completion, this system measures real time task completion and budget status. The use of conference calls and web-based meeting rooms allow for frequent and efficient meetings with the City, internal staff, and sub-consultants. At CGA, a key exercise for maintaining schedule is performed in the kick-off meeting by identifying key risk factors. This involves the complete team and includes each discipline and responsible team member. We focus on task critical functions based on each discipline’s knowledge area. The complete involvement emphasizes schedule awareness and complete team buy-in. For example, if a potential slip in the schedule is identified, the Project Manager can address it through the project’s issues and risk analysis process. Schedule changes often have downstream impacts and permitting is always a critical element. Therefore, CGA project managers are trained to use the schedule as a functional tool and focus on critical task that impact the final completion timeline. With the schedule distributed to the team, the project manager closely tracks individual task and updates project progress. If circumstances occur that have the potential to cause delays, the project manager is authorized to assign more resources to the project. If delays are permitting or administrative in nature, the project manager will revise the schedule considering the potential risk of continuing forward with a design without final project approval. Such a situation will be presented to the City to determine if the delayed tasks can proceed based on the anticipated outcome of the third party approvals processes. The CGA Team understands that a schedule is intended not only for the consultant, but also for the City to coordinate their resources for reviewing submittals and for reporting to other City staff and Departments. The CGA PM and team is equipped to handle projects varying in nature and timeline. The CGA team structure and experience allow for simultaneous execution of multiple projects or project tasks as well as fast-tracking or expediting projects. CGA cross-trains our project managers and task leaders to gain critical experience in multiple areas of civil engineering. By doing this, we enable multiple project teams to work concurrently on the same project. This allows for undertaking separate tasks for one project on parallel tracks or multiple projects at the same time. Additionally, the CGA CADD team and junior engineering staff are well-rounded and work for project managers across the civil engineering disciplines, ranging from water and wastewater to roadway and parks design. While the organizational chart shows certain employees under specific categories, plans production and project management functions are similar across the disciplines; so our engineering staff is able to work across disciplines, as needed to expedite the completion of projects or tasks. Project timelines depend on the complexity of the project, the permitting requirements, and external factors such as grant deadlines and agency review times. Pulling more resources, performing tasks simultaneously, permitting awareness and superb subconsultant coordination are mechanisms for reducing the overall schedule for a project, if needed. The approach to controlling project budgets, another important management technique, is to identify if the budget is sufficient for the scope of work being requested at the beginning of a project and track the budget throughout the lift of the project. CGA will work with the City to understand the basis of the budget number to help ensure that additional scope is not added without consideration on how this affects the budget. With each design milestone, cost estimates will be prepared for comparison to the budget. The unit prices in the cost estimates are constantly being updated with the best available information at that time and are subject to change even when additional scope is not added due to variation in the construction industry. If a project is in jeopardy of being over budget, immediate attention is provided to address why and determine what steps need to be taken. 25 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA) Another method of cost control during construction is CGA’s multidisciplinary constructability review as part of our Quality Assurance/Quality Control process. This process consists of a peer review process where a design group not directly involved with the project will review the plan documents with a fresh perspective. Once the comments have been addressed, the plans are submitted to the firm’s Director of Engineering for final sign off before being released. The multi-disciplined review process also consists of a constructability review by a member of the CEI or construction services department. This review specifically ensures that the plans make sense from a construction perspective and is intended to minimize potential problems in the field during construction. Once the client and regulatory agencies approve the final design, the construction documents will be finalized and submitted to the City for bidding. All of the team members and subconsultants team members have worked with Mrs. Martinetti on previous projects. Subconsultant coordination is streamlined by group emails and frequent meetings, as noted above, to be sure they are on track with task completion and moving in the intended directions. The proposed team has collaborated and will continue to collaborate effectively and efficiently under her leadership. Our team understands the needs of the City and is fully capable of delivering all the services required for the planning, design, permitting and construction services relating to this contract. Additionally, the CGA team has experience with assisting municipalities in obtaining grants or executing projects funded by grants with specific time constraints or reporting requirements. We have successfully completed projects funded by Local Agency Project (LAP) funding, FEMA Hazard Mitigation Grant Program (HMGP) funds, Florida Inland Navigation District (FIND) grants, County Incentive Grant Program (CIGP), Community Block Grant (CBD), State Revolving Funds (SRF) and others. CGA has recently completed the design on multiple LAP projects, meeting the FDOT imposed LAP schedule and requirements from their checklists. We have also been involved with the applications for House and Senate Appropriations including filling out the forms, providing technical back-up and working on the project design. The keys to success of every project will be keeping the City Staff informed with efficient communication, experienced and responsive technical staff, and innovative, value- engineering design. Whether plan review, technical resource staffing or project specific assignments are required, the CGA team has the experience and dedication necessary to produce superior results. Our emphasis on teamwork and quality control allows us to consistently exceed our clients’ expectations. We are ready and motivated to perform on this contract, and have a high level of availability. Location of Office Where Work will Be Performed 1800 Eller Drive, Suite 600, Fort Lauderdale, FL 33316 SF330 Part I and II Please reference the following pages for CGA's and our subconsultants SF330 Part I and II. Licenses and Certifications CGA is licensed to do business in the State of Florida. After the SF330 section, you'll find copies of licenses and/or certifications for CGA, key personnels, and subconsultants. 26 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)27 (Complete this section for the prime contractor and all key subcontractors.) STANDARD FORM 330 ARCHITECT - ENGINEER QUALIFICATIONS PART I - CONTRACT-SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION B. ARCHITECT-ENGINEER POINT OF CONTACT D. ORGANIZATIONAL CHART OF PROPOSED TEAM C. PROPOSED TEAM 9. FIRM NAME (Check)PRIMEJ-V PARTNERSUB-CONSULTANT11. ROLE IN THIS CONTRACT 1. TITLE AND LOCATION (City and State) 2. PUBLIC NOTICE DATE 4. NAME AND TITLE 5. NAME OF FIRM 6. TELEPHONE NUMBER 7. FAX NUMBER 8. E-MAIL ADDRESS 3. SOLICITATION OR PROJECT NUMBER CHECK IF BRANCH OFFICE CHECK IF BRANCH OFFICE CHECK IF BRANCH OFFICE CHECK IF BRANCH OFFICE CHECK IF BRANCH OFFICE CHECK IF BRANCH OFFICE (ATTACHED)X 10. ADDRESS a. b. c. d. e. f. STANDARD FORM 330 (REV. 8/2016) - SF330-A ThRu C_CGA Continuing Professional Consulting Services (CCNA) July 8, 2020 Sarah Sinatra Gould, AICP Calvin, Giordano & Associates, Inc. 954.921.7781 954.921.8807 Marketing@CGAsolutions.com 20-07-01 Planning Director Calvin, Giordano & Associates, Inc.X 1800 Eller Drive Suite 600 Fort Lauderdale, FL 33316 PRIME CONSuLTANT: Civil Engineers, Electrical Engineers, Surveyors and Mapping, Environmental Engineering, and Construction Engineering and Inspection (CEI) Services Alan Gerwig & Associates, Inc.X 12798 W. Forest hill Blvd. Suite 201 Wellington, FL 33414 SuB-CONSuLTANT Structural Engineering Services (as-needed) Chrome Engineering, Inc. X 16650 N. Kendall Drive Suite 205 Miami, FL 33196 SuB-CONSuLTANT Structural Engineering for CEI services Nutting Engineers of Florida, Inc.X 2051 NW 112 Avenue Suite 126 Miami, FL 33172 SuB-CONSuLTANT Geotechnical Services (as-needed) Tierra South Florida, Inc. X 2765 Vista Parkway Suite 10 West Palm Beach, FL 33411 SuB-CONSuLTANT Geotechnical Services for CEI (material testing) uS utility Potholing & Air Excavation (uSuPAE)X 4630 NE 11th Avenue Oakland Park, FL 33334 SuB-CONSuLTANT Utility Designation Utility Potholing SUE 28 D. ORGANIZATIONAL CHART OF PROPOSED TEAM STANDARD FORM 330 (REV. 8/2016) - SF330-D_CGA_ORG ChART Professional Services Key Personnel Firm Civil Engineering Overall Project Manager - Jenna Martinetti, PE; James Messick, PE; Mohammed Sharifuzzaman, PE; Nicholas W. Kanelidis, PE; Heidi Belle Handerson, PE Principal-in- Charge Sarah Sinatra Gould, AICP Surveying and Mapping Project Manager for Surveyors and Mapping - Steve Watts, PSM; Pablo Dominguez Electrical Engineering Project Manager for Electrical Engineering - Jorge Cervantes, PE; Julio E. Gonazalez, PE; Katharine Kupsky Environmental Engineering Project Manager for Environmental Engineering - Sandra Lee, AICP CEP, CFM, LEED AP BD+C; Drew Lindemann Construction Engineering and Inspection Project Manager for CEI - Mohamed Mabrouk, PE; Erik Padron, PE; Hugo DaSilva, PE; Felix Garcia, PE; Bernnon Artola; Erin Sudman; Reynaldo Alfonso; Lance Robinson; Gary Craig; Julio Antonio; Victor Murphy; Reza Shams Landscape Architecture (as-needed) Tammy Cook-Weedon, PLA, LEED AP BD+C; Gianno Feoli; Michael D. Conner, ASLA, PLA, ISA; Marcos Mendoza, Maria A. Alonso, NCIDQ, ASID, ASLA; Dominic James Mack III, Assoc. ASLA Geotechnical (as-needed)Subconsultant: Richard Wohlfarth, PE; Stephen Mrachek Geotechnical for CEI (as-needed)Subconsultant: Raj Krishnasamy, PE; Kumar Vedula, PE; Francois Thomas, PE Structural (as- needed)Subconsultant: Alan Gerwig, PE; Simon Coleman, PE; Donald Beers, PE Structural for CEI (as-needed)Subconsultant: Oscar J. Cruz, PE; Jorge A. Canales, PE; Gregory P. Dover, PE SUE (as- needed) Subconsultant: Robert Charles “Chuck” R. Faust, Jr.; Juan Rivera; Marvin Parkins; Michael Murphy; Aagie Monteleone Additional In- house Support Services Construction Administration; Estimating & Budgeting; Traffic Engineering; Planning; Geographic Information Services; Website Development 29 c. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete One Section E for Each Key Person.) 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE 19. RELEVANT PROJECTS a. b. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 SARAh SiNATRA GOulD SARAH SINATRA GOULD, AICP Calvin, Giordano & Associates, inc. Masters in urban & Regional Planning AiCP B.A. in Political Science Fort Lauderdale, FL Florida Atlantic University No. 158802 Florida Atlantic University Mrs. Gould has over 16 years of planning experience including municipal planning director duties such as processing zoning requests, land use plan amendments, site plan reviews, plats rezoning petitions, variances, vacation/abandonments and all other development application reviews. She holds a Master in Urban and Regional Planning from FAU. Mrs. Gould has also written evaluation and appraisal reports, comprehensive plans and zoning and land development codes. She is experienced in writing form- based codes and transit-oriented zoning codes. As the Planning Department Director for Calvin, Giordano & Associates, she acts as the Director of Development Services for the City of Weston and the Town Planner for North Bay Village. For those entities, she carries out day-to-day planning and zoning activities, presents staff reports and recommendations to the commissions, the planning and zoning boards and provides customer service assistance to residents, developers and business owners. PLANNING 16 15 Town of Surfside Planning Department Surfside, Florida Respond to zoning calls from the public. Created the development review process for the Town and chair the development review group meetings. Review zoning permits and prepare items for the Design Review Board Meeting. Present site plans and permits to the Design Review Board, which analyze architectural and design standards in completing the review. Complete development reviews including site plans, plats, variances, special exceptions, land use plan amendments and rezoning applications. Prepare all staff memorandums and present the items to the Planning and Zoning Board and the Town Commission. 2006 - 2020 Surfside Zoning Code Surfside, Florida CGA prepared a form based inspired code for the entire Town, where a strong relationship was built between building heights and land uses. The focus of the community was to protect the character of the 1 and 2 story residential areas. While the Town wanted a form base approach, they also wanted to maintain control of more conventional zoning parameters, such as setbacks. CGA was able to develop a form base code that achieved these goals while providing for the conventional controls the Town required. 2010 Director of Development Services Weston, Florida Process development review applications including site plans, plats, variances, special exceptions, land use plan amendments and rezoning as well as managing the Planning and Zoning Department. Prepare items for the Development Review Committee (DRC) and the City Commission by chairing the DRC meeting, preparing the staff memorandum to the City Commission and presenting the application to the City Commission. 2018 30 h. 19. RELEVANT PROJECTS (CONT.) f. e. d. g. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 SARAh SiNATRA GOulD EAR and EAR Amendments Surfside and Weston, Florida Town of Surfside EAR and EAR Amendments: Updated to meet changes in the Florida Statutes and included a focus on sustainability and resiliency. City of Weston EAR and EAR Amendments: Updated the Comprehensive Plan to meet Florida Statute requirements. Focus on redevelopment. 2007 & 2017 Consulting Planner Cutler Bay, Florida Provide development review services to the Town. Review development applications including site plans, land use plan amendments, variance and rezoning applications. Prepare staff memorandums and present the items to the Town Council. Town Planner Village of North Bay Village, Florida Provide development review services to the Village. Review development applications and requested zoning code amendments. Prepare staff memorandums and present the items to the Planning and Zoning Board and Village Commission. Collins to harding Corridor Analysis Surfside, Florida Prepared an analysis and zoning criteria to help guide future development into the desired development pattern. Including a comparison of existing conditions ,a review of traffic engineering standards, impacts to existing buildings and strategies for potential non-conformities design criteria for pedestrian walkways and new zoning criteria. 2015 General Planning Medley, Florida Process development review applications including site plans, plats, variances, special exceptions, land use plan amendments and rezoning. Prepare items for the Development Review Committee (DRC) and the Town Council by chairing the DRC meeting, preparing the staff memorandum to the Town Council and presenting the application to the Town Council. 31 c. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete One Section E for Each Key Person.) 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE 19. RELEVANT PROJECTS a. b. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 JeNNA MARTiNeTTi JENNA MARTINETTI, PE Calvin, Giordano & Associates, inc. B.S., Civil engineering, Magna Cum Laude Professional engineer Florida Fort Lauderdale, FL Florida State University, Tallahassee, FL No. 69035 Ms. Martinetti has over 16 years of engineering experience designing and managing projects within many local municipalities. Her roadway design experience includes design for milling and resurfacing, widening, roadway reconstruction, safety improvement projects, neighborhood enhancements, ADA upgrades and compliance, drainage improvements, signing and pavement markings, traffic control plans, storm water pollution prevention control plans and complete streets incorporation. Her experience also includes utility coordination, participation in the quality control process, and local agency program (LAP) coordination, including agency certification assistance. She has the advanced maintenance of traffic certification required to design and permit traffic control plans and has extensive experience with JPA’s and LAP projects including Transportation Enhancement Program and CIGP. Her project management experience also includes design and retrofit of parks, roadways, water mains, sewage force mains, lift stations, fuel station, site development and design, neighborhood improvement projects, and stormwater projects as well as permitting, bidding documents, engineering during construction and project close-out. OVERALL PROJECT MANAGER 16 16 Nova Drive Complete Streets improvements Project Davie, Florida Project manager and engineer of record for Nova Drive, from Davie Road to east of University Drive, to widen a portion of the corridor from 2 lanes to 4 lanes and implement complete streets initiatives including reducing lane widths, traffic calming measures such as a roundabout, adding bike lanes and sharrows, upgrading signalization, pedestrian improvements, signing and pavement marking plans, MOT, drainage modifications, lighting, and tree removal/relocations. This project is grant funded and almost complete with construction. A major FPL relocation was necessary in order to construct the new roundabout. 2014-Present, Senior Project Manager, Previous Town Engineer: Jonathan Vogt, PE (954) 797-1137. Construction Cost: ($6.9M), Firm Fees: $459,475 2014 - Ongoing 2020 Broad Causeway LAP Project Bay Harbor Islands, Florida Senior project manager for design and construction document preparation for adding a paved shoulder to the Causeway and replacing the pedestrian handrail along the waterways bridge. The project is an FDOT Local Agency Program (LAP) funded project requiring coordination and submittals to FDOT D6, including using their electronic review comment (ERC) system, as required due to the federal funding. Assisting the Town with their LAP Certification process is also included. 2017 Ongoing Rickenbacker Causeway Miami-Dade County, Florida In-house project manager as a sub-consult for the design build team with Kiewit Construction for the rehabilitation of the Rickenbacker Causeway’s West Bridge and the rehabilitation and expansion of the Bear Cut Bridge. CGA’s scope included hydrographic and topographic survey, drainage design, lighting, and signing and pavement markings. The Bear Cut Bridge was widened to accommodate a protected multi-use path in both directions and an 8’ bike lane adjacent to traffic in both directions as well as improvements to both approaches requiring coordination with two of the County’s adjacent future projects. The existing cross slope and bridge deck structure were modified impacting the existing drainage and requiring permits through Miami Dade County’s Regulatory & Economic Resources Department and South Florida Water Management District. CGA coordinated the bridge circuits during construction as well as providing new lighting for the widened bridge and new multi-use paths. 2013 - 2014 2014 32 h. 19. RELEVANT PROJECTS (CONT.) f. e. d. g. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 JeNNA MARTiNeTTi Fronton Boulevard improvements Dania Beach, Florida Senior Project Manager for the improvements to Fronton Boulevard in order to upgrade the existing Jai-alai facility to accommodate a casino. Redesign of this City owned roadway was required as part of the developer’s agreement with the City. Upgrades on Fronton Blvd were accomplished by alignment changes in order to add a median as well an additional southbound lane, new parking for the adjacent park, and two new right turn lanes and entrances to the facility. Design, permitting, and construction services for the improvements as well as new offsite water mains on Fronton Blvd, SR A1A/Dania Beach Blvd and NE 2nd Street; overall coordination of utilities; and drainage design to accommodate the roadway improvements was performed. Construction Cost - $3.1 Million, Professional Fees - $766,000 2013 - 2016 2016 Davie Road Phase ii Corridor enhancements Davie, Florida Senior PM for design of Davie Road from Nova Drive to SW 39th Street. The scope includes adding bike lanes and a landscaped median within the existing 5 lane pavement section, widening of the sidewalks, ADA upgrades, signalization upgrades, signing and pavement marking plans, MOT, drainage modifications, lighting, and tree removal/relocations. The project is an FDOT Local Agency Program (LAP) funded grant project requiring coordination and submittals to FDOT, including following their utility coordination process. Post Design services for this federally funded project required close coordination with the FDOT and CEI team. 2015 - 2018 2018 Rolling Oaks Park Miami Gardens, Florida Senior civil project manager for the design and construction of an ADA-compliant pedestrian trail and associated retention areas within Rolling Oaks Park. Wayfinding signage and ADA ramps were provided at the intersections along a route through the surrounding neighborhood to connect the new trail in the park to an existing walking trail in the Dolphin Center Park, which is located three quarters of mile away. In addition, the existing drainage permit for the master site plan had to be modified to account for the proposed trail improvements. These new drainage facilities were carefully planned to avoid removing any trees as well as limit impacts to the future master plan for the park. The design for the trail included new outdoor fitness stations, seating areas, LED site lighting and custom- designed way-finding signage for all of the trailhead signs, directional signs, and mile markers. 2012 - 2015 2015 Davie Road Phase i Roadway improvements Davie, Florida Senior project manager for Davie Road Phase 1, from SR 84 to Nova Drive. The scope included widening Davie Road from a 5 lane section to 6 lane divided roadway with bike lanes, upgrading signalization and signing and pavement markings, traffic control plan, ADA upgrades, new sidewalks and pedestrian enhancements, drainage modifications, new lighting, a new landscaped median, and tree removal/relocations. This project is partially funded by a County Incentive Grant (CIGP) and required extensive coordination for a Town project on a County owned roadway. 2013 - 2016 2016 SR 870/Commercial Boulevard, FDOT District iV Tamarac, Florida Project manager for the design, permitting and post design services for this FDOT RRR project. The scope includes milling and resurfacing, signing and pavement markings, signalization and lighting upgrades at two intersections, ADA upgrades, safety improvements, traffic monitoring sites, and utility coordination. Phase 1 was complete in 2014 and Phase 2 was completed in 2016. 2011 - 2016 2016 33 h. 19. RELEVANT PROJECTS (CONT.) f. e. d. g. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 JeNNA MARTiNeTTi Water Main Replacement on Ne 2nd Avenue Dania Beach, Florida Engineer of Record for the replacement of about 7,000 LF of 12” water main plus some 4-inch, 6-inch, and 8-inch water main with tie ins in a residential neighborhood including replacing all water services, connections to the existing main, and fire hydrants. 2020 - Ongoing Hallandale Beach SW Quadrant Drainage improvements Hallandale Beach, Florida Senior Project Manager for major enhancements to the existing drainage system within the City’s SW Quadrant to reduce the flooding during large storm events by isolating the system from tidal influence and pumping the stormwater into proposed injection wells. The project includes the construction of a new pumping station with two (2)- 350 HP pumps and an automated trash rack, storm water force mains, seventeen (17) injection wells, a control structure consisting of four (4) flap gates and one sluice gate, an 800 kW generator, an intelligent controls and monitoring system and landscaping enhancements in areas affected by construction This project is funded by FEMA HMGP grant funds. Client: Manga Ebbe. (954) 457-3042. Construction Cost: $9.6 million, Firm Fees: $782,395. 2014 - Ongoing Dania Casino and Jai-Alai Off-site Water Main Upgrades Dania Beach, Florida Senior Project Manager for design for the onsite and offsite improvements required to upgrade the existing Jai-alai facility to accommodate a casino. As part of the developer’s requirement with the City and the demand of the upgraded facility, new water distribution lines surrounding the site area were required to be installed. Design and permitting for 1570 LF of 8” pipeline, 1270 LF of 12” pipeline, new fire hydrants both onsite and offsite, and multiple new service and irrigation connections for the project site. City, Health Department and FDOT permitting and certifications were required for the new water main. Client Reference: F3 Architecture, Joaquin Gerlero. Water owner/supplier: City of Dania Beach 2013 - 2016 2016 Windmill Park Coconut Creek, Florida Senior Project Manager for the design of a 14 acre redevelopment to an existing park. Subconsultant to the architect for the site design modifications including ADA sidewalks, exercise stations, a new parking lot and parking lot improvements, pavement marking and signage, stormwater management, grading, stormwater pollution prevention, and utilities modifications to accommodate a reconstructed office building and dog park. 2015 - 2017 2018 Dania Cove Park improvements Dania Beach, Florida Project manager for the design and installation of park improvements including a pedestrian pathway, 2 picnic pavilions, benches, picnic tables, educational and entrance signage, and trash receptacles for Dania Cove, aka Fuzzy Bunny Park, in Dania Beach. The city needed design, permitting and construction completed in 13 months in order to meet the deadline for two separate grants funding the project. The project also included shoreline restoration using sheet pile wall, environmental and stormwater permitting, site grading, grant administration, and landscaping improvements. The project was completed in time for the City to receive the entire grant funding available for reimbursement. 2010 - 2012 2012 34 c. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete One Section E for Each Key Person.) 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE 19. RELEVANT PROJECTS a. b. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 JAMeS MeSSick JAMES MESSICK, PE calvin, Giordano & Associates, inc. B.S., civil engineering Professional engineer Florida Fort Lauderdale, FL University of Dayton, Dayton, OH No. 70870 Mr. Messick’s experience includes both the private and public sectors of civil engineering. Responsibilities include studies and design for large scale stormwater management systems, along with the permitting of stormwater management systems, and local roadway improvements sewage collection and transmission systems, water distribution systems, utilities for general site development for private/public engineering projects, design of septic/lift stations to obtain permits from agencies such as Miami-Dade County WASD, FDEP, FDOH, and FDOT along with applicable South Florida counties, municipalities and local agencies, along with detailed experience with engineering services during construction. ENGINEER 15 6 city center Parking Lot Pembroke Pines, Florida As Engineer of Record and Project Manager, Mr. Messick was the lead designer for parking lot to serve future City Center development in the City of Pembroke Pines, Florida. Parking lot modifications included driveway connectivity and roadway relocation to provide ease of access and reduce impacts from existing FPL transmission lines and associated power poles throughout previously permitted design. Project includes modifying drive aisles locations, parking lot reconfiguration, ADA accessibility, pavement marking and signage, and drainage modifications to proposed parking lot project. 2014 - 2015 2016 - 2018 Hallandale Beach SW Quadrant Drainage improvements Hallandale Beach, Florida Mr. Messick was Engineer of Record for this project which includes major enhancements to the existing drainage system within the City’s SW Quadrant to reduce the flooding during large storm events by isolating the system from tidal influence and pumping the stormwater into proposed injection wells. The project includes the construction of a new pumping station with two (2)- 350 HP pumps and an automated trash rack, storm water force mains, seventeen (17) injection wells, a control structure consisting of four (4) flap gates and one sluice gate, an 800 kW generator, an intelligent controls and monitoring system and landscaping enhancements in areas affected by construction. The new wells will be pressurized with fifteen (15) feet of head in order to produce the necessary discharge into the G3 aquifer. FDEP, ACOE, and the Broward County Environmental Resource Department have permitted the project. Bidding Services and Construction Administration Services are also being provided by CGA. This project is funded by FEMA HMGP grant funds. 2016 - 2018 2018 - Ongoing Professional Services Bal Harbour Village, Florida Mr. Messick is the Client Manager and main liaison for overseeing ongoing professional services to the Bal Harbour Village. This Continuing Engineering Service Agreement which began in 2017 allows CGA to provide assistance in various projects and plan review services including Civil Engineering, Electrical Engineering, Surveying, GIS, and Construction Services. Services include Building Department Public Works and Utilities plan reviews, Sunshine 811 Services management, FDEP Annual Reporting for NPDES, Miami-Dade County MS4 TMDL Prioritization Plan & Assessment Plan and Department of Regulatory & Economic Resources Reporting – Sanitary Sewer System Modeling and Water Usage Reporting, and GIS Database Verification and Updates. This agreement also allows design services under the CCNA including engineering studies, cost estimating, water and/or sewer main improvements, storm water management or drainage system improvements, roadway reconstruction, and associated construction inspection. 01/2019-Ongoing Ongoing 35 h. 19. RELEVANT PROJECTS (CONT.) f. e. d. g. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 JAMeS MeSSick Bid Pack 8 Oakland Park, Florida Project Engineer for the water and sewer improvements project located within the City of Oakland Park. Design included approximately 18,000 linear feet of water main replacement, rehabilitation of lift station B-1 and installation of 4 sewer combination air valves (SCAV) to alleviate compressed air within the City’s sanitary sewer force main system. Project was bid in summer of 2016 and construction completed in early Summer 2019. 2013 - 2018 N/A Lloyd estates Oakland Park, Florida Mr. Messick assisted with the lift station outparcel for an improved stormwater management system to aid in the reduction of flood duration and elevation during storm events within the Lloyd Estates neighborhood. The improvements included a bioswale and typical driveway design. Grant services were provided for this project that resulted in approximately $4 Million of funding from the FEMA Hazard Mitigation Grant Program. 2014 - 2015 2015 - 2016 Boca Sewer Manhole Replacement Boca Raton, Florida Mr. Messick served as the Engineer of Record for the City of Boca Raton Sewer Manhole Replacements project. Due to the presence of unsuitable soils and inadequate maintenance over the years, Mr. Messick’s design included replacement of several existing manholes at two project sites. Mr. Messick oversaw Surveying, Civil Engineering, and Construction Administration services, which incorporated doghouse structures to relieve extended by-pass pumping and dewatering activities during construction. Permits were obtained from Palm Beach County Health Department and Engineering Departments for the approximately 20 feet deep gravity sewer mains. Construction commenced in December 2019 and was completed in early 2020. 2019 2020 Dania Jai Alai Dania Beach, Florida Mr. Messick is the project engineer for the design and coordination of the proposed water and sewer improvements for this multi-phased project located in Dania Beach, Florida. The scope of work includes modeling of water and sewer utilities, and design for both on-site water and gravity sewer mains, and offsite lift station and sanitary sewer force main with a connection to the City of Dania Beach owned lift station #6. Pressure test data collection was conducted to assist in lift station design, and project was permitted and construction completed in 2016. 2014 - 2016 2016 Natalie’s cove Drainage improvements Cooper City, Florida As Engineer of Record and Project Manager, Mr. Messick was in charge of complete drainage improvements to this local neighborhood in the City of Cooper City, Florida. After a basin wide drainage analysis, it was determined that significant improvements to level of service may be achieved by increasing conveyance pipe sizes from adjacent neighborhoods to existing stormwater management system. In addition to pipe upsizing, project includes increasing lake storage by the donation of wetland creation along eastern lake bank, roadway milling and resurfacing and ADA compliance for all surrounding pedestrian sidewalks. Permitting were completed to both South Florida Water Management District and Central Broward Water Control Districts for modifications to existing drainage permits, with a construction completion date of Spring 2020. 2013 - 2018 2018 - 2020 36 h. 19. RELEVANT PROJECTS (CONT.) f. e. d. g. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 JAMeS MeSSick Memorial Hospital South Solarium Hollywood, Florida Project Engineer for the construction a solarium addition to the existing Memorial Hospital South facility located in Hollywood. Design of the solarium included an ADA accessible entrance, drainage modifications, parking lot reconfiguration, along with pavement marking and signage improvements for the existing facility. 2014 - 2015 2015 - 2016 YMcA Homestead Drainage improvements Homestead, Florida Project engineer for the design and coordination of the proposed stormwater improvements for the Homestead YMCA site located in Miami-Dade County, Florida. Scope includes design of drainage improvements to the existing stormwater management system to prevent localized flooding of existing daycare facility and adjacent gymnasium. Bids were opening in September 2014. Due to the request for additional drainage improvements, YMCA was able to obtain additional funds from the City of Homestead, which finished drainage improvements in Summer of 2017. 2016 2017 Basin 5 Stormwater Master Plan, Phase ii Dania Beach, Florida Project manager for initial design and permitting for the improvements contained in the recommendation of the Storm Water Master Plan of Basin 5, Phase II in the Dania Beach, Florida. Project consists of three duplex pump stations, more than 20,000 linear feet of high capacity storm sewer improvements to improve storm water conveyance, increase of discharge outfall structure efficiency and exfiltration trenches to improve area water quality. Mr. Messick leads to redesign of this project to provide a bio-swale located on county maintained tidal intercostal West Lake Park, and will reduce storm stages with the construction of the three duplex pumps. Phase II includes verifying existing utilities are not in conflict and providing upgrades to several intersections to meet ADA criteria. 2009 - 2015 N/A Three island Reuse Water Pipeline Hallandale Beach, Florida Mr. Messick is the Engineer of Record for this project which includes improvements to the existing reuse pipeline and pump station improvements project in the City of Hallandale Beach, FL. The proposed pipeline will provide City of Hollywood reuse effluent stored in an existing underground tank, which is then pumped to the proposed landscaped median improvements within the Three Islands Boulevard, Parkview Drive, and Leslie Drive Roadways. The project includes the construction of approximately 4,500 LF of new 8” reuse water main, one directionally drilling portion under existing canal crossing, connections to median landscape islands, replacement of two new pumps to meet the increased demand of irrigation. FDEP and the Broward County Environmental Resource Department permits will be obtained for these improvements. Bidding Services and Construction Administration Services are also being provided by CGA. Project is currently slated for construction in fall of 2020. 2020 - Ongoing Future Raw Water Pipeline Hallandale Beach, Florida Project Engineer of Record for the raw water pipeline project located within the City of Hallandale Beach. Design included approximately 2,776 linear feet of 12” DIF raw water main, connection to existing raw water system, and the installation of a combination air release valve to alleviate compressed air or vacuum conditions within the City’s raw water force main. The raw water upgrades include isolated ADA and sidewalk improvements and school crossing signage improvements to meet BCTED requirements. Geotechnical investigations concluded that a portion of the main construction will need to be remediated to prevent future settlement along the proposed pipeline. Project is currently slated for construction in Summer of 2020. 2019 - 2020 Future 37 c. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete One Section E for Each Key Person.) 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE 19. RELEVANT PROJECTS a. b. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 MOhAMMeD ShARRiFuzAMAN MOHAMMED SHARIFUZZAMAN, PE Calvin, Giordano & Associates, inc. M.e., Civil engineering, 2000 Professional engineer Florida B.S., Civil engineering, 1997 Fort Lauderdale, FL Lamar University, Beaumonth, TX No. 67640 Bangladesh University of Engineering & Technology, Bangladesh Mr. Sharifuzzaman has more than 17 years of professional experience in civil, environmental, and transportation engineering with specialization in hydraulics and hydrologic modeling (H&H), surface water management system design, drainage basin/watershed modeling and floodplain analysis, master drainage study, conceptual/master surface water management system design, stormwater pump station design, stormwater retrofit projects, nutrient loading analysis (TMDL calculations), Stormwater Treatment Area (STA) design, FDOT roadway drainage design, and bridge hydraulics. His extensive experience includes land development projects including commercial/residential/institutional/DRI projects, roadway projects including new construction, widening and reconstruction, RRR and safety improvement projects, and PD&E study. He has worked extensively with permitting agencies including the SFWMD, FDEP, FDOT, USACE, various municipalities, and counties. His trusted reputation with the permitting agencies has produced a long list of successful and profitable projects. His extensive experience with construction, and thorough knowledge of codes and regulations as they apply to each development, is an asset for any project. ENGINEERING/PERMITTING 17 7 engineering/Permitting Services Dania Beach, Florida Review of site plans, engineering plans, engineering design documents for various projects in the City of Dania Beach as part of the City’s development services and permitting review process. Ongoing engineering/Permitting Services Sunny Isles Beach, Florida Review of site plans, engineering plans, engineering design documents for various projects in the City of Sunny Isles Beach as part of the City’s development services and permitting review process. Ongoing Surfside Abbott Avenue Drainage Study Surfside, Florida Responsible for drainage design including watershed modeling of Town of Surfside master drainage system, determination of probable cause of flooding, determination of most feasible and optimum drainage improvements to minimize the potential for future flooding. The proposed drainage improvements included up-sizing of conveyance pipes, stormwater pump stations with pressurized drainage wells. 2018 N/A 38 h. 19. RELEVANT PROJECTS (CONT.) f. e. d. g. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 MOhAMMeD ShARRiFuzAMAN engineering/Permitting Services Weston, Florida Review of site plans, engineering plans, engineering design documents for various projects in the City of Weston as part of the City’s development and permitting review process. Ongoing Flamingo Gardens Master Drainage Study Cooper City, Florida Modeling of 135-acre Flamingo Gardens Master Drainage Basin to determine the potential cause of neighborhood flooding and determination of the most feasible drainage improvements to minimize future flooding. Performed drainage analysis, calculations, modeling, alternative improvements and cost/benefit analysis. 2014 2019 Oak Grove Park Miami-Dade County, Florida Design of pedestrian/bike path, boat ramp, fishing piers, picnic areas/shelter, on-street parking along SW 70 Avenue, and a restroom facility with water main and gravity sewer main extension. 2013 2013 Nova Drive improvements Davie, Florida Responsible for drainage design including modification of existing stormwater management system, analysis and modeling of “Basin A” of Tindall Hammock Irrigation and Soil Conservation District (THISCD), integration of Nova Drive drainage system with THISCD rock pit drainage system, integration of Nova Drive system with existing CBWCD canal systems and College Avenue Drainage System . The proposed project scope includes upgrading of the existing roadway to a four lane divided roadway along with turn lanes, driveway access, and roadway intersection improvements. 2014 2019 engineering/Permitting Services Town of Belleair, Florida Review of site plans, engineering plans, engineering design documents for various projects in the Town of Belleair as part of the Town’s development and permitting review process. Ongoing 39 m. 19. RELEVANT PROJECTS (CONT.) k. j. i. l. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 MOhAMMeD ShARRiFuzAMAN Davie Road Phase i improvements Davie, Florida Responsible for drainage design including modification of existing stormwater management system, analysis and modeling of “Basin A” of Tindall Hammock Irrigation and Soil Conservation District (THISCD), integration of Davie Road drainage system with THISCD rock pit drainage system. Project scope included widening of the existing roadway to a six lane divided roadway along with turn lanes, driveway access, and roadway intersection improvements from south SR 84 to Davie Road. 2013 2017 Patch Reef Park Artificial Turf Greater Boca Raton Beach & Parks District, Florida Responsible for design and permitting for Patch Reef Park recreational development which includes three large synthetic turf athletic fields along with site drainage system improvements, irrigation, and related water and wastewater infrastructure improvements. 2017 2019 hallandale Beach Stormwater 42 Year CDBG Hallandale Beach, Florida Responsible for design and permitting for the Hallandale Beach Stormwater 42 Year CDBG project. The proposed drainage improvements included additional catch basins, exfiltration trench and conveyance pipes that will drain through the existing outfalls into the existing retention lake reducing road flooding and flood duration. 2016 2018 Lloyd estates Drainage Study Oakland Park, Florida H&H study for the Lloyd Estates drainage basin seeking FEMA grants, conceptual design for a pump station across Sleepy River discharging into the SFWMD C-13 canal. Performed drainage analysis and modeling. 2015 2018 Mills Pond Park Fort Lauderdale, Florida Responsible for Design and permitting for Mills Pond Park recreational development which includes three large synthetic turf soccer fields along with site drainage system improvements, field lighting, irrigation, and related water and wastewater infrastructure improvements. 2015 2018 40 c. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete One Section E for Each Key Person.) 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE 19. RELEVANT PROJECTS a. b. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 NichOlAS KANeliDiS NICHOLAS W. KANELIDIS, PE calvin, Giordano & Associates, inc. Master of engineering, 2011 Professional engineer - Florida B.S. in civil engineering, 2009 FDeP Stormwater, erosion & Sedimentation control inspector Fort Lauderdale, FL University of Florida, Gainesville, FL No. 78536 Florida State University, Tallahassee, FL No. 40536 Mr. Kanelidis’ background experience encompasses site design, civil, geotechnical, surface water management, water, and wastewater services for both the private and public sector. He also had significant involvement with his prior firm in representing Sunshine Water Control District as District Engineer working on numerous Capital Improvements Projects. As a Project Manager at CGA, his responsibilities include preparing contract proposals, developing and managing project schedules, hydrologic and hydraulic modeling, developing quantity take- offs and cost estimates, preparing various engineering plans and technical specifications, permitting, bidding assistance, project management during construction, addressing Contractor RFI’s, reviewing shop drawings, negotiating and reviewing change orders, as-built reviews, and final project certifications. As an engineer with design and field experience, he is versatile in his ability to perform the tasks at each individual project stage. CIVIL ENGINEER 9 6 North Galt Shops Streetscape and Parking improvements Fort Lauderdale, Florida Project Manager for a City of Fort Lauderdale streetscapes and parking improvement project that includes new landscape, irrigation, decorative light poles, curbing, pavement, striping, signage, sidewalk, drainage infrastructure, and geometric traffic improvements. The existing hardscape and landscape needed replacement due to years of use and harsh environment, and traffic flow and pedestrian crossings left room for improvement. In turn, the design includes new crosswalks and traffic flow patterns. The existing drainage system had to be redesigned to accommodate these changes. Project scope includes design, permitting, reviewing and incorporating Geotechnical and Subsurface Utility Exploration reports, quantity take-offs and cost estimating, value engineering, and preparing technical specifications. CGA is currently under contract to provide support services during bidding and construction. 2019 - Ongoing 2020 - Ongoing lift Station No. 48 Rehabilitation and Force Main Replacement Cooper City, Florida Project Manager for a municipal sewer pump station rehabilitation project including approximately 1,400 linear feet of force main replacement. Located in a residential neighborhood, the existing station utilizes suction-lift pumps that are housed above the wet well and are nearing the end of their useful service life. Additionally, the existing 4-inch cast iron force main was extremely corroded causing a significant reduction in its inner diameter. The design included a conversion of the station to a submersible type with new pumps, a new valve vault, and a new 4-inch HDPE force main designed primarily for horizontal direction drilling installation. Project scope includes design, permitting, incorporating Geotechnical and SUE findings, preparing a cost estimate, technical specifications, bidding assistance, coordinating and running construction progress meetings, conducting routine inspections, reviewing shop drawings, addressing Contractor RFI’s, and final project certification. 2019 - Ongoing 2019 - Ongoing Phase 2B Water Main improvements Bal Harbour, Florida Project Manager for a water main replacement project just east and parallel to Collins Avenue in Bal Harbour, Florida. The existing 8-inch water main was undersized and was located within easements on the properties of two high-rise condominiums. The new HDPE 12-inch water main was proposed within the same easement but was designed using primarily horizontal directional drilling methods due to existing hardscape and access limitations. Reconnecting existing services, fire lines, and restoration had to be coordinated with the Health Department, the Fire Department, and the Property Managers for the affected condominiums. The fast-tracked project was completed in about two months. Project scope included design, permitting, incorporating Geotechnical and SUE findings, coordinating and running a preconstruction meeting with all stakeholders, reviewing shop drawings, addressing Contractor RFI’s, conducting interim inspections, overseeing testing, preparing record drawings, and final project certification. 2019 2019 41 h. 19. RELEVANT PROJECTS (CONT.) f. e. d. g. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 NichOlAS KANeliDiS Natalie’s cove Drainage improvements Cooper City, Florida Project Engineer for the design and modification of a stormwater conveyance system for drainage improvements in the local neighborhood. A drainage model and analysis were conducted for the entire basin. It was determined that significant stormwater level of service improvements could be attained by increasing conveyance pipe sizes throughout the system and by increasing the existing lake storage capacity via dredging along the bank. In addition to these stormwater improvements, the project consisted of roadway resurfacing and ADA compliance modifications for pedestrian sidewalks. Project responsibilities included hydraulic modeling, design, permitting, addressing permitting agency comments, preparing quantity take-offs, cost estimating, preparing technical specifications, and addressing Bidder RFI’s. CGA also provided typical services during construction. 2013 - 2020 2018 - 2020 lift Station No. 18 Rehabilitation Davie, Florida PM for a LS rehabilitation project located within a residential neighborhood. Existing submersible pump configuration didn’t include a guide rail system nor enough clearance to remove pumps from the wet well to perform inspections. Instead, Town Staff had to enter confined space to perform work. Both existing pumps had failed, & Town Staff was operating the station using spare pumps. The existing valve vault was settling, & mechanical appurtenances needed replacement. Design included new pumps w/ a guide rail system, new top slab w/ access hatch, & new aboveground piping & valves on a concrete slab. Scope included coordination w/ pump manufacturers, hydraulic calculations, electrical & instrumentation, cost estimating, preparation of contract documents, bidding assistance, reviewing shop drawings, addressing Contractor RFI’s, reviewing & negotiating change orders as-needed, performing routine inspections, approving Contractor payment applications, conducting construction progress meetings, reviewing as-builts, & final project certification. 2018 - 2020 2020 croissant Park Water Main Replacement Fort Lauderdale, Florida Project Manager for a residential project to replace 16,000 linear feet of undersized and deteriorating water main with DIP and HDPE pipe. The existing piping did not provide proper fire protection to the neighborhood. Residents were also filing complaints regarding water discoloration caused by corrosion of the existing cast iron mains. The project scope included design, permitting, reviewing and incorporating Geotechnical report findings, coordinating subsurface utility exploration for conflict resolutions, preparing quantity take- offs, cost estimating, preparing technical specifications, addressing Bidder RFI’s, and evaluating bid proposals. Most of the infrastructure was installed using HDPE and trenchless methods to minimize disturbance to the neighborhood, including pipe bursting and horizontal directional drilling. CGA also provided services during construction that included attending biweekly construction progress meetings, reviewing shop drawings, addressing Contractor RFI’s, conducting interim inspections, reviewing as-builts, and final project certification. 2017 - 2020 2018 - 2020 Wastewater Treatment Plant Drying Bed Replacement Boca Raton, Florida Project Manager for a wastewater treatment plant project to replace and relocate the existing concrete drying bed at the City of Boca Raton’s Utility Services Complex. The drying bed structure is used as part of the City’s vacuum truck operations for drying sewer solids before properly disposing of the dry sludge. The existing drying bed had reached the end of its useful service life due to its constant use and harsh environmental. A new, larger, and segmented drying bed was designed and constructed to improve daily operations and efficiency. Project tasks included design, verifying turning radii and clearances for vacuum truck operations, reviewing Geotechnical findings, resolving utility conflicts, cost estimating, preparing technical specifications, addressing Bidder RFI’s, evaluating bid proposals, attending monthly construction progress meetings, reviewing shop drawings, addressing Contractor RFI’s, coordinating minor changes during construction, conducting interim inspections, reviewing as-builts, and final project certification. 2017 - 2019 2018 - 2019 Pines Village Water Main Replacement - Phase i Pembroke Pines, Florida Project Manager for a residential neighborhood project to replace 20,000 linear feet of undersized and corroded galvanized water main with new PVC and DIP. The buildup of rust in the existing mains resulted in numerous complaints about water discoloration and low pressures. The design also included relocating water meters to the front of the properties and replacing private water services including dual check valves and the installation of thermal expansion control devices at the house connections. Approximately half of the existing water mains were located in the backyards of the single-family residential properties. Along with the relocations, water meters were also replaced to allow for automatic readings. Project responsibilities included design, permitting, reviewing and incorporating Geotechnical findings, preparing quantity takeoffs, cost estimating, preparing technical specifications, addressing Bidder RFI’s, evaluating bid submittals, and attending neighborhood meetings with the City to address residents’ questions. 2018 2018 - 2019 42 m. 19. RELEVANT PROJECTS (CONT.) k. j. i. l. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 NichOlAS KANeliDiS lift Station No. 9 Rehabilitation Davie, Florida Project Manager for a municipal sewer pump station rehabilitation. The existing pumps failed when the mechanical room flooded with sewage backflow from the adjacent wet well. Since the station was being operated 24 hrs/day by a portable diesel-powered bypass pump in a residential neighborhood, it quickly became a priority project for the Town. The project was unique in that the station is located within Hollywood. Therefore, additional coordination was required between the two municipalities for permitting and construction scheduling. The project scope included site visit documentation, pump manufacturer coordination and specifications, sewer flow analysis, hydraulic calculations, ventilation system sizing, electrical and instrumentation, sump pump and piping replacement, cost estimating, permitting, preparation of contract documents for bidding, addressing Bidder RFI’s, evaluating submitted bids, shop drawings reviews, addressing Contractor RFI’s, reviewing and negotiating change orders, construction inspections, reviewing as-builts, and final project certification. 2017 - 2018 2018 Sewer Pump Station B-10 Rehabilitation Fort Lauderdale, Florida Project Manager for a municipal sewer pump station rehabilitation project. The existing pumps were reaching the end of their service life, and the existing concrete wet well was consistently leaking into the dry mechanical room. Coordinating with the neighboring residents, designating equipment staging areas, and determining proper MOT were crucial, since the station is located in the median of the road. Tasks included analyzing existing flow and pressure conditions, hydraulic calculations, specifying new pumps, new electrical and ventilation design, permitting, preparing technical specifications, bidding assistance, addressing Contractor RFI’s, reviewing shop drawings, conducting routine inspections, reviewing and negotiating change orders, as-built reviews, and final project certification. 2015 - 2019 2017 - 2019 Sewer Pump Station D-41 Replacement Fort Lauderdale, Florida PM for a municipal sewer main & PS replacement. Upgrades to the station’s operating capacity were needed due to excessive flows, frequent surcharging, & accommodation for future development sewer contributions. The scope entailed replacement & relocation of existing station & redirection of gravity sewer conveyance network. Coordination played a key role in this project as the proposed location for the PS & design of the new sewer main had to be planned with the neighboring development & their design team. Specific project tasks included analysis of existing sewer flow contributions, review of existing force main pressures, hydraulic calculations for designing new force main & submersible pumps, valve vault design, electrical & instrumentation design, permitting, coordinating with other disciplines including Geotechnical & SUE, preparing technical specifications, bidding assistance, addressing Contractor RFI’s, reviewing & negotiating change orders, shop drawing reviews, conducting routine inspections, reviewing as-builts, & final project certification. 2015 - 2018 2017 - 2018 Sanitary Sewer hydraulic Model and evaluation Bal Harbour, Florida Project Manager and primary developer of a hydraulic model and overall evaluation of Bal Harbour Village’s sanitary sewer network. Bal Harbour Village owns, operates, and maintains a wastewater collection and transmission system that includes 27,000 linear feet of gravity sewer, 5,000 linear feet of force main, and two pump stations. Wastewater from various customers, including single family homes, oceanfront high rises, multi-family dwellings, and commercial properties, is collected and conveyed through laterals, gravity sewer main, force main, and pump stations. The purpose of the hydraulic study was to provide the Village with the capability to predict peak flows, hydraulic pressures, pump station capacities, and likelihood of surcharged conditions throughout their entire sanitary sewer network and to assess the capacity to serve future proposed demands. 2019 2019 Bayshore Drive Drainage improvements Fort Lauderdale, Florida Project Manager for the analysis and design of drainage system improvements in the Central Beach Alliance Neighborhood located off A1A. The scope included preparation of a drainage model for existing site conditions by using ICPR and utilizing survey, record drawings, and LIDAR for calibration. A full drainage report summarized the different options for improvements in the area with associated costs. Some of the proposed alternatives included exfiltration trenches, drainage injection wells, and tidal check valves. Ultimately, the City tasked CGA to design tidal check valves on the outfall pipes and additional stormwater structures and conveyance piping in areas with significant ponding. layout. Additionally, the City requested traffic improvements by the addition of a median at the unique intersection of Bayshore Drive, Riomar Street, and Antioch Avenue. CGA also provided typical services during construction. 2014 - 2019 2016 - 2019 43 r. 19. RELEVANT PROJECTS (CONT.) p. o. n. q. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 NichOlAS KANeliDiS lift Station No. 52 Rehabilitation Cooper City, Florida Project Manager for a municipal sewer pump station rehabilitation project. Improvements were needed due to the expiring service life of the pumps and their insufficient operating capacity during peak flows and significant rain events. Tasks included design, permitting, interpreting pressure data logger readings, hydraulic calculations, coordinating with pump manufacturers, existing sewer flow analysis, monitoring geotechnical work, and coordinating with other professional disciplines. 2015 - 2016 2016 lift Station No. 21 Replacement Cooper City, Florida Project Manager for a municipal sewer pump station replacement project. The station is located within an HOA and required mechanical, aesthetic, and immediate odor control improvements. Due to its proximity with adjacent residences and frequent odor complaints, the station was relocated across the street. This required a sewer conveyance, landscape, and irrigation redesign. Tasks included design, permitting, setting up pressure data loggers, hydraulic calculations, coordinating with pump manufacturers, existing sewer flow analysis, preparing technical specifications, permitting, shop drawing reviews, addressing Contractor RFI’s, conducting routine inspections, and final project certification. 2015 - 2018 2017 - 2018 Bid Pack 8 infrastructure improvements Oakland Park, Florida Project Engineer for the water and sewer improvements project. Design included approximately 18,000 linear feet of water main replacement, 800 linear feet of drainage with exfiltration trench, 2,500 linear feet of sidewalk, rehabilitation of a sewer pump station, and installation of four sewer combination air valves (SCAV) on the existing force main network. The system upgrades consisted of replacing two-inch and four-inch diameter water main with either six-inch or eight-inch PVC or DIP. Additional fire hydrants were designed to provide adequate fire protection for the residential neighborhoods. In addition to these water main improvements and SCAV’s, the sewer pump station improvements were a critical component of this project. The station was experiencing failure due to extended run times because of increases in collected wastewater flows and discharge force main pressures. Electrical upgrades and the design of variable frequency drives were required to handle the various flow conditions. 2014 - 2018 2018 - 2019 lloyd estates industrial and Residential improvements Oakland Park, Florida Project Engineer for the design and modification of a stormwater conveyance system to improve flooding within the Lloyd Estates Neighborhood. The project included a stormwater pump station and floodgates for major storm events along with new stormwater structures and exfiltration trenches. New seawalls were designed and constructed downstream of the station that ultimately discharged to the ocean via the South Florida Water Management District (SFWMD) C-13 Canal. The pump station site provided means for erosion control that included rip-rap design. CGA also coordinated and assessed the environmental impacts with SFWMD and the Army Corps of Engineers. In addition to stormwater discharge improvements, several areas included upgrades to the water distribution system for fire protection services. The project funding was driven by a FEMA grant. 2013 - 2017 2016 - 2017 Bid Pack 9 infrastructure improvements Oakland Park, Florida Project Engineer during the construction phase of a large scale infrastructure improvements project that included replacement of three municipal lift stations, approximately 20,000 linear feet of water main, 5,600 linear feet of force main, over 200 catch basins, and numerous exfiltration trenches and conveyance piping throughout the 500 acre project area. Responsibilities included shop drawing reviews, attending progress meetings, general engineering during construction, reviewing as-builts, validating and negotiating change orders, and coordinating final project certifications. 2011 - 2017 2015 - 2017 44 c. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete One Section E for Each Key Person.) 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE 19. RELEVANT PROJECTS a. b. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 HeiDi HeNDeRSON HEIDI BELLE HENDERSON, PE Calvin, Giordano & Associates, inc. M.S., environmental engineering, 2013 Professional engineer Florida B.S., Civil engineering, 2003 Qualified Stormwater Management inspector Fort Lauderdale, FL Florida International University, Miami, Fl No. 72304 Florida State University, Tallahassee, FL No. 8491 Miss Henderson has over 15 years of civil engineering experience in land development for both commercial and residential projects. Responsibilities include municipal reviews for Public Works and Utility permits, due diligence and site research, drainage design, water distribution and sanitary sewer collection and transmission system design, construction cost estimates, general site development for both public and private engineering projects, construction administration, observation, certification, and permitting services with various municipalities and local agencies throughout Central Florida and South Florida inclusive of South Florida Water Management District (SFWMD), Broward County, Miami-Dade County, Florida Department of Transportation (FDOT), Florida Department of Environmental Protection (FDEP), and Florida Department of Health (FDOH). ENGINEER 15 2+ Plan Review Bal Harbour Village, Florida Lead Public Works and Utilities Reviewer for the City’s Building Department for commercial and residential projects. Heidi assists residents and Contractors by providing Public Works and Utilities information, and assists in educating the residents and Contractors in the importance of utilizing and maintaining erosion control methods during construction. 06/2018 - Ongoing Plan Review Sunny Isles Beach, Florida Lead Public Works Reviewer for the City’s Building Department for commercial and residential projects. 04/2018- 08/2018 Outfall O-13 Harbor Point, Florida Miss Henderson is currently designing and permitting for the relocation of the existing drainage Outfall O-13 in the Village of Key Biscayne. A pre-versus post-drainage analysis is required to demonstrate that the proposed improvements alleviate the current flooding in the 14 Harbour Point Right-of-Way. 45 h. 19. RELEVANT PROJECTS (CONT.) f. e. d. g. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 HeiDi HeNDeRSON Village Consultant Bal Harbour, Florida Calvin Giordano & Associates is the Village’s Consulting Engineer. Miss Henderson is a Consulting Engineer to Bal Harbour Village where she manages the Sunshine 811 services for the Village’s dig tickets and design tickets; the Water, Sewer, Stormwater, Electrical GIS database; and the as-built information for the Village. Heidi assists the Village in their day-to-day needs with respect to Public Works and Utilities services, and oversees the request for as-builts for any proposed developments and improvements within the Village. 04/2018 - Ongoing Yellow Green Farmer’s Market expansion Hollywood, Florida Miss Henderson is the Drainage and Utility Engineer of the expansion. This includes a drainage analysis of the existing conditions and the proposed improvements. The design consists of exfiltration trench to provide storage for the improvements. The utility design includes a new lift station for the additional flows that the market will be producing. Plan Review - City of Dania Beach Dania Beach, Florida Provided plan review services to the City for Right-of-Way permits. 08/2019-01/2020 engineer - City of Dania Beach Dania Beach, Florida Assisted the City Engineer in the City’s day-to-day activities such as addressing customer concerns, responding to customer requests, providing utility atlases, and managing City projects as needed. 09/2019-01/2020 engineer - City of Dania Beach Dania Beach, Florida Provide assistance to the Public Service Department by addressing customer concerns, responding to customer requests, and providing utility atlases. 05/2020 - Ongoing 46 h. 19. RELEVANT PROJECTS (CONT.) f. e. d. g. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 HeiDi HeNDeRSON Wawa at 6971 SW 34th Street Miami, Florida This site required similar efforts mentioned for the Wawa above where Miss Henderson was the Project Manager and Engineer of Record for the design and permitting of the site, responsible for the water, sewer, and stormwater layout of 15-foot deep exfiltration trench; required a Zoning hearing for a signage variance and platting via Miami-Dade County; and required the same permits as listed above. 01/2015-12/2017 Wawa at 11101 SW 184th Street Miami, Florida Miss Henderson was the Project Manager and Engineer of Record for the design and permitting of the site. She was responsible for the site layout including ADA accessibility as well as water, sewer, and stormwater layout of the site. The stormwater management system was composed of 15-foot deep exfiltration trench. The site required Zoning approval for a signage variance and platting through Miami- Dade County. The permits required for this site were through Miami-Dade County Public Works Department, Miami-Dade County Water and Sewer Department (WASD), and Miami-Dade County Building Department. 01/2015-12/2017 Wawa, inc. Wawa is a well known gas station and convenience store that is known for their fresh bread and made-to-order sandwiches and is making their way down to South Florida. Miss Henderson was the Project Manager for the Wawa program where she was involved from the early conceptual phases of the projects through project completion. More specifically, her tasks involved due diligence for possible new sites, preparation of various site layouts that conformed to both Wawa and the governing agencies criteria, conveying to the Wawa the feasibility of the project, generating proposals based on the site’s requirements and necessary permitting efforts, coordinating meetings with Wawa and the Developer(s) involved, preparing water, sewer, and stormwater civil design plans, calculations, and reports for the projects, obtaining all required civil permits, assisting on building permitting efforts, and providing construction observation and certification services. Provided construction administration services and certified the project. 2013 - 2017 City of Lauderhill, Florida Lauderhill, Florida Miss Henderson was the liaison between the Landscape Team and the City of Lauderhill in order to meet the City’s criteria and timeframe for the beautification improvements for Ilene Lieberman Botanical Park and 17th Street Park. The projects consisted of using recyclable materials for the improvements and providing a walking path, benches, and restoration of the existing landscape materials to provide a more appealing environment for the community. Sewer Pump Station No. 1 Drainage improvements Bal Harbour Village, Florida Miss Henderson was responsible for issuing the bid on behalf of the Village, which included preparation of technical specifications and bid documents, submission of the bid to multiple vendors preparation of the probable construction cost estimate for a comparison to the bid amounts received, responding to technical questions from prospective bidders, preparation and issuance of associated addendum, and providing a recommendation of the lowest responsive and responsible bidder to the Village. 47 c. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete One Section E for Each Key Person.) 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE 19. RELEVANT PROJECTS a. b. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 JORge CeRvANTeS JORGE R. CERVANTES, PE Calvin, giordano & Associates, Inc. electrical engineering Professional engineer Florida Fort Lauderdale, FL University of Oklahoma, Norman, OK No. 45832 (1992) Mr. Cervantes has 32 years of experience in designing lighting and power systems for roadways, parks, manufacturing, commercial, residential and educational buildings, engineering project fee estimates, lighting consultant expert witness. His experience includes lighting verification and/or recertification of roadway, recreational parks, parking structures and outdoor parking areas. He is an expertise in AutoCAD. ELECTRICAL ENGINEER 32 1+ Hallandale Beach SW Quadrant Drainage Hallandale, Florida Electrical design coordination, design and review of the pump station building and control station gate, generator sizing coordination and controls. Coordination with local utility companies. Construction administration management. 2019 Lift Station #18 Davie, Florida Electrical design coordination and design of the proposed sewage pump station. Coordination with local utility companies. Construction administration management. 2019 90th Avenue Sanitary Sewer Improvements Cooper City, Florida Electrical design coordination and design of the proposed sewage pump station. Coordination with local utility companies. Construction administration management. 2019 48 h. 19. RELEVANT PROJECTS (CONT.) f. e. d. g. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 JORge CeRvANTeS Nova Drive Davie, Florida This road is classified as a collector road. This road contains sidewalks, cross interceptions, roundabout, pedestrian crossways and paved roads. Design and coordination of the street lighting levels (average maintain horizontal illuminance, illuminance uniformity ratio and veiling luminance ratio) as per FDOT Greenbook 2013 edition requirements. Selection of fixtures, pole heights and placements were critical in order to achieve the requirements as per FDOT Greenbook. Careful consideration was given to existing and proposed vegetation during design. Voltage drop calculations from point of source to each lighting pole on the circuit. Coordination with utility company for new point of services. 2018 N/A Davie Road extension Phase III Davie, Florida This road is classified as a collector road. This road contains sidewalks, pedestrian crossways and paved road. Design and coordination of the street lighting levels (average maintain horizontal illuminance, illuminance uniformity ratio and veiling luminance ratio) as per FDOT Greenbook 2018 edition requirements (Design using FDOT Greenbook 2018 edition was given due to adoption during 2019 calendar year). Selection of fixtures, pole heights and placements were critical in order to achieve the requirements as per FDOT Greenbook. Careful consideration was given to existing and proposed vegetation during design. Voltage drop calculations from point of source to each lighting pole on the circuit. Coordination with utility company for new point of services. 2019 SW 2nd Avenue - Fort Lauderdale DDA Fort Lauderdale, Florida This road is classified as a local road. This road contains sidewalks and paved road. Design and coordination of the street lighting levels (average maintain horizontal illuminance, illuminance uniformity ratio and veiling luminance ratio) as per FDOT Greenbook 2016 edition requirements. Utilizing DDA standard fixtures, poles and proper spacing, the FDOT Greenbook requirements were met. Careful consideration was given to existing vegetation during design. Voltage drop calculations from point of source to each lighting pole on the circuit. 2019 Water and Sanitary Lift Pump Station Cooper City, Florida Prepare sanitary lift pump station rehab criteria documents for Cooper City, rehab criteria documents include drawings and specifications to meet client expectations. Coordination of the electrical equipment with manufacturers. Coordination of control systems for the pump stations usage. Review contractor’s field installed equipment for compliance with construction documents. Review contractor’s pay request on behave of the client. Prepare field observed construction status reports and provide feedback comments on any observed deficiencies. Involve in the electrical engineering quality design for water and sanitary lift pump stations. 2019 Lift Pump Station B10 Fort Lauderdale, Florida Construction administration management and project close out. 2019 49 m. 19. RELEVANT PROJECTS (CONT.) k. j. i. l. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 JORge CeRvANTeS Catalina Drive Weston, Florida This road is classified as a local road. This road contains sidewalks and paved road. Design and coordination of the street lighting levels (average maintain horizontal illuminance, illuminance uniformity ratio and veiling luminance ratio) as per FDOT Greenbook 2016 edition requirements. Utilizing City of Weston standard fixtures, poles and proper spacing, the FDOT Greenbook requirements were met. Careful consideration was given to existing vegetation during design. Voltage drop calculations from point of source to each lighting pole on the circuit. 2018 Spring Boulevard Weston, Florida This road is classified as a local road. This road contains sidewalks and paved road. Design and coordination of the street lighting levels (average maintain horizontal illuminance, illuminance uniformity ratio and veiling luminance ratio) as per FDOT Greenbook 2016 edition requirements. Utilizing City of Weston standard fixtures, poles and proper spacing, the FDOT Greenbook requirements were met. Careful consideration was given to existing vegetation during design. Voltage drop calculations from point of source to each lighting pole on the circuit. 2018 North Lake Boulevard Weston, Florida This road is classified as a local road. This road contains sidewalks and paved road. Design and coordination of the street lighting levels (average maintain horizontal illuminance, illuminance uniformity ratio and veiling luminance ratio) as per FDOT Greenbook 2016 edition requirements. Utilizing City of Weston standard fixtures, poles and proper spacing, the FDOT Greenbook requirements were met. Careful consideration was given to existing vegetation during design. Voltage drop calculations from point of source to each lighting pole on the circuit. 2018 Pedestrian Bridge Bal Harbour Island, Florida Design and coordination of the bridge lighting levels (average maintain horizontal illuminance and illuminance uniformity ratio) as per FDOT Greenbook 2016 edition requirements. Utilizing latest low voltage LED rail mounted fixtures and proper spacing, the FDOT Greenbook requirements were met. Voltage drop calculations from point of source to each light fixture on the circuit. 2018 College Avenue Davie, Florida This road is classified as a collector road. This road contains sidewalks, cross interceptions, roundabout, pedestrian crossways and paved roads. Design and coordination of the street lighting levels (average maintain horizontal illuminance, illuminance uniformity ratio and veiling luminance ratio) as per FDOT Greenbook 2013 edition requirements. Utilizing FPL (Florida Power and Light) standard fixtures, poles and proper spacing, the FDOT Greenbook requirements were met. 2018 50 c. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete One Section E for Each Key Person.) 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE 19. RELEVANT PROJECTS a. b. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 JuliO GONzAlez JULIO E. GONZALEZ, PE Calvin, Giordano & Associates, inc. Bachelor Degree, Mechanical engineering Professional engineer Florida Fort Lauderdale, FL University of Puerto Rico No. 37275 Mr. Gonzalez has more than 20 years working in the construction industry, he has a strong background and experience with the Florida Building, NFPA and Mechanical Codes. He has extensive knowledge and experience in design and management of mechanical systems including HVAC, plumbing and fire protection for residential and commercial projects. Furthermore, he has experience with mechanical centrifugal chillers, screw machines, reciprocating chillers, cooling towers, chilled water systems, DX systems as well as hydronic systems. Due to Mr. Gonzalez’s extensive knowledge and experience, he has worked as a forensic engineer leading field investigations, evaluating causes and losses by natural disasters, accidents, malfunction and vandalism related to mechanical systems. For the past several years, Mr. Gonzalez has dedicated his professional career to performing technical inspections of mechanical systems as well as reviewing specifications to ensure compliance with State and local codes. ENGINEER 20+10 Mechanical engineer Florida Providing mechanical engineering services for the following: City of Homestead; Cassa Brickell - Miami, FL; Silverspot Cinema - Miami, FL; Miami City Self Storage - Miami, FL; Atton Brickell Hotel - Miami, FL; Homewood Suites - Miami, FL; Seventh Avenue Transit Village - Miami, FL; Leon Medical Centers - Miami, FL; Stardust East and West - Miami, FL; The Plaza at Lyric - Miami, FL; Miami International Medical Center - Miami, FL; Met 3 Residential Tower - Miami, FL; 2020 Salzedo - Miami, FL; and Melia East and West - Miami, FL 11/2015 - Ongoing Mechanical engineer - NV5, inc. Hollywood, Florida Plans review for mechanical and plumbing. Perform inspections for mechanical and plumbing during the different phases of construction. Perform Forensic Engineering work for mechanical and plumbing systems. 09/2015-11/2015 Delta G Consulting engineers Fort Lauderdale, Florida Project Manager for a Health Care Team, and Mechanical Engineer of Record. In charge of the HVAC, Plumbing and Fire Protection of various projects, mostly Health Care projects. Office project mananagement and meeting with clients during the different phases of design. Meet with AHCA for stand-up meetings, final AHCA inspections. Assisted of less experienced engineers and designers. Wrote technical specifications for division 15. Implemented new techniques for Quality Control. 08/2013-08/2015 51 h. 19. RELEVANT PROJECTS (CONT.) f. e. d. g. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 JuliO GONzAlez VeRTeX Construction Services, inc. - Forensic engineer Fort Lauderdale, Florida Forensic Engineer leading field investigations evaluate causes and losses by natural disasters, accidents, malfunction and vandalism related to mechanical systems of buildings and structures. 02/2010-10/2011 American Test lab of South Florida - Witnessing engineer Fort Lauderdale, Florida Witnessing Engineer for an independent Material Testing Laboratory in Miami, Florida. Witness laboratory testing, review and sign and seal official report documents for High-Velocity Hurricane Zones, in accordance with Miami-Dade County, Florida Building Code, ASTM, AAMA, ANSI, and other related Building Construction Standards. 05/2009-Ongoing Smith Seckman Reid, inc. - Mechanical engineer Deerfield Beach, Florida Project Manager for a Health Care Team, and Mechanical Engineer of Record. In charge of the HVAC, Plumbing and Fire Protection of various projects, mostly Health Care projects. Office project mananagement and meeting with clients during the different phases of design. Meet with AHCA for stand-up meetings, final AHCA inspections. Assisted of less experienced engineers and designers. Wrote technical specifications for division 15. Implemented new techniques for Quality Control. 10/2011-08/2013 52 c. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete One Section E for Each Key Person.) 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE 19. RELEVANT PROJECTS a. b. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 KAThARiNe KupSKy KATHARINE KUPSKY Calvin, Giordano & Associates, inc. university of Wisconsin Advanced Blueprint Reading and estimating Advanced CAD Fort Lauderdale, FL Adult Education Community College Broward Community College Ms. Kupsky’s background experience entails drafted and designed residential, commercial, retail, industrial and governmental properties from site planning through building permit, prepared environmental plans and sections, and prepared cost estimates. At CGA, Ms. Kupsky’s responsibilities include drafting plans and details for civil and electrical engineers, coordinate with Sunshine 811 for utility locates, and prepare cost estimates. CAD TECHNICIAN 27 6 City Center parking Lot Pembroke Pines, Florida Drafting civil and electrical plans and details for development of a parking lot to serve the future City Center and relocate the roadway for ease of access and to reduce impacts from existing FPL transmission lines. The project entailed modifying drive aisles, pavement markings and signage, parking lot layout redesign, drainage modeling with hydraulic calculations, and modifying the existing permit. Spring Boulevard Weston, Florida Drafted electrical plans and details for this project for the design of new street lighting. Bid pack 8 infrastructure improvements Oakland Park, Florida Drafted civil and electrical plans and details for a design including approximately 18,000 linear feet of water main replacement, 800 linear feet of drainage with exfiltration trench, 2,500 linear feet of sidewalk, rehabilitation of a sewer pump station, and installation of four sewer combination air valves (SCAV) on the existing force main network. 53 h. 19. RELEVANT PROJECTS (CONT.) f. e. d. g. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 KAThARiNe KupSKy Andrews Avenue Oakland Park, Florida Drafted civil and electrical plans for the removal of existing two-way turn lanes in the middle of the roadway and replace with landscape medians and dedicated turn lanes, reconstruction of existing sidewalks to meet current ADA standards, add bike lanes, mid-block crossings for pedestrians, pavement markings & signage for a four lane divided road, and lighting. Mills pond Fort Lauderdale, Florida Drafted civil and electrical plans, details, and notes for adding synthetic turf fields to Mills Pond Park. The Electrical design showed power distribution, fixture and equipment schedule, lighting layout, photometrics, special systems diagrams, and sport lighting design. The civil design included grading and drainage, utility service points and supply lines, pavement, and pedestrian walkways. hallandale Beach SW Quadrant Drainage improvements Hallandale Beach, Florida Drafted Civil and Electrical plans, details and notes for the design of enhancements of the drainage system in the city of Hallandale Beach. The project included construction of a new pumping station, storm water force mains, injection wells, a control structure with flap and sluice gates, and a 800 KW generator. Artists Alley Delray Beach, Florida Drafted electrical plans, details and photometrics for street beautification. The street enhancements included concrete sidewalks, landscape beautification, drainage, water main and on-street parking. patch Reef park Boca Raton, Florida Drafted civil plans, details, and notes for adding synthetic turf fields to Patch Reef Park. The Electrical design showed relocation of main power feed and power to irrigation pump. The civil design included grading and drainage, relocation of water and sewer lines, pavement, pedestrian walkways and design of the Synthetic turf fields including field striping. 54 c. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete One Section E for Each Key Person.) 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE 19. RELEVANT PROJECTS a. b. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 STeve WATTS STEVEN M. WATTS, PSM Calvin, Giordano & Associates, Inc. BSLS, 1984, Lambda Sigman: Land Surveying Honorary Florida PSM Fort Lauderdale, FL Purdue University, West Lafayette, IN No. 4588 Mr. Watts has over 36 years of experience, 32 years as a licensed Florida Professional Surveyor & Mapper. Having spent his entire surveying career working in South Florida, he is extremely knowledgeable of the rules, requirements and specifications for completing surveying and mapping projects in the tri-county area. He specializes in architectural and engineering design type surveys, land acquisition, easements, title research, and computer mapping. SURVEY AND MAPPING 36 6 North Beach Oceanside Park Miami Beach, Florida Project Manager for the Boundary and Topographic Survey tasks associated with the re-design of the North Beach Oceanside Park. Survey tasks included defining the location of the Coastal Construction Control Line (CCCL), the Erosion Control Line (ECL), the Seasonal High-Water Line and the limits of the dune boundaries. 2015 - Ongoing Middle Beach Recreational Corridor Miami Beach, Florida Project Manager for the surveying tasks associated with the City of Miami Beach Middle Beach Recreational Corridor project. Tasks included topographic survey and property base mapping throughout the project limits. Additional responsibilities included responding to Request for Information (RFI’s) as they pertain to survey matters and assisting design professionals with survey related issues. 2012 - 2018 Dune Survey & Beach Front Property Map Surfside, Florida Project Manager for the base mapping of the twenty-seven (27) individual properties between Collins Avenue and the Atlantic Ocean depicting the Coastal Construction Control Line (CCCL), Bulkhead Line and Erosion Control Line (ECL) in relation to the property lines, with the town limits of Surfside. Overlaid hydrographic elevation information as provided by U.S. Army Corps of Engineers. 2018 - 2019 55 h. 19. RELEVANT PROJECTS (CONT.) f. e. d. g. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 STeve WATTS General Surveying & Mapping Services Pembroke Pines, Florida Boundary and Topographic Surveys, As-Built Surveys, Legal Descriptions, City Limit Determinations and General Surveying Services for the City of Pembroke Pines. Additional responsibilities include project surveyor for the topographic survey of a portion of the Pines Health Park, the Johnson Street Water Treatment Plant and the FPL Easement Parking Lot at City Centre. Ongoing General Surveying & Mapping Services Surfside, Florida Site Plan and Development Review Committee regarding survey matters; Engineering Design Surveys for parks and underground utility projects, Town parking lot parcels and municipal properties, sketch and legal descriptions for beach hardpack easements and FEMA Elevation Certificates. 2010 - Ongoing General Surveying & Mapping Services Fort Lauderdale, Florida Route Survey of NE 13th Street from NE 4th Ave to NE 9th Ave.; Boundary and Topographic Surveys for Warsaw & Provident Park, Topographic Survey and Sketch and Legal Description of Utility Easement - Mills Pond Park. Ongoing General Surveying & Mapping Services North Lauderdale, Florida Boundary and Topographic Surveys, As-Built Surveys, Legal Descriptions, City Limit Determinations and General Surveying Services for the City of North Lauderdale. Additional responsibilities include project surveyor for the topographic survey of the municipal complex, GIS, water control district and utility mapping, Hampton Pines Park and Silver Lakes Middle School ball field renovation. Ongoing Topographic Survey - Westchester Cultural Arts Center/Topographic Park Miami-Dade County, Florida Project Manager for Topographic Survey for a portion of Tropical Park located at 7900 SW 40th Street, Miami for the proposed Westchester Cultural Arts Center. Ongoing 56 m. 19. RELEVANT PROJECTS (CONT.) k. j. i. l. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 STeve WATTS Margate - vinson Park Margate, Florida Surveyor for the Boundary & Topographic Survey for Margate Vinson Park, 5790 Margate Boulevard, Margate, being all of Parcel A of the plat of MARGATE COMPLEX, Plat Book 172, Page 46, B.C.R., Parcel ID of 4841-36-24-0010. Location of all above-ground improvements within the parcel and including the one-half right-of-way of the adjacent roadways with horizontal locations and vertical elevations being obtained for such items as sidewalks, edge of pavement, concrete curb, ball fields, buildings, parking lot striping, fences, driveways and visible above-ground utilities. 04/2020 General Surveying & Mapping Services Weston, Florida FEMA Flood Elevation Certificates for Community Buildings, Site Plan and Development Review Committee regarding survey matters; Engineering Design Surveys for Village Homes of Country Isles Water Main & Service replacement Project; Sketch and Legal Descriptions for parcel acquisition and City Limits Exhibits between Weston and Town of Davie. Ongoing 57 c. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete One Section E for Each Key Person.) 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE 19. RELEVANT PROJECTS a. b. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 PAblO DOMiNguez PABLO DOMINGUEZ Calvin, giordano & Associates, inc. Miami Dade College N/A Fort Lauderdale, FL Miami-Dade, FL Mr. Dominguez has 18 years of experience as a surveyor and mapper. Having spent his entire surveying career working in South Florida, he is extremely knowledgeable of the rules, requirements and specifications for completing surveying and mapping projects in the South Florida area. He specializes in Digital Terrain Mapping (DTM) type surveys, design surveys, right of way surveys, hydrographic surveys, 3D laser scanning surveys as well as construction stake out projects, land acquisition and computer mapping. SURVEY AND MAPPING 18 6 Dune Survey & beach Front Property Map Surfside, Florida Survey Technician for the base mapping of the twenty-seven (27) individual properties between Collins Avenue and the Atlantic Ocean depicting the Coastal Construction Control Line (CCCL), Bulkhead Line and Erosion Control Line (ECL) in relation to the property lines, with the town limits of Surfside. Overlaid hydrographic elevation information as provided by U.S. Army Corps of Engineers. 2012 general Surveying & Mapping Services Miami Beach, Florida 3D laser scanning of Fontainebleau Hotel interior and exterior walls for the purpose of generating civil plans to refurbish the historic look. 2009 Middle beach Recreational Corridor Miami Beach, Florida Senior Party Chief, responsible for the field surveying tasks associated with the City of Miami Beach Middle Beach Recreational Corridor project. Tasks included establishing survey control networks, three wire bench runs, topographic data collection, recovery of property monuments and supervising field data collection efforts with multiple crews. 2012 - 2018 58 h. 19. RELEVANT PROJECTS (CONT.) f. e. d. g. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 PAblO DOMiNguez giS System Key West, Florida Location of all power poles and transformer pads belonging to Keys Energy between mile marker 1 (Key West) thru mile marker 40 (Big Pine Key) along US-1 and community roads for purpose of GIS map also including Tank Island. Utilizing GPS Handheld and GPS RTK instruments. 2013 general Surveying & Mapping Services Miami Beach, Florida Directed field crew operations for the 3D laser scanning of treatment plant facilities at the George T. Lohmeyer Wastewater Treatment Plant. Additional tasks included processing 3D point cloud and compiling information in an AutoCAD drawing format. 2020 3D High Definition laser Scanning - george T. lohmeyer Regional WTP Fort Lauderdale, Florida Drainage survey for the city of Marathon, Fl. To include the recovery/ reset of primary network control, location of all drainage structures, measure inverts, check cross sections along US-1 for FDOT. 2020 Topographic Survey - Westchester Cultural Arts Center/Tropical Park Miami-Dade County, Florida Drainage survey for the city of Marathon, Fl. To include the recovery/ reset of primary network control, location of all drainage structures, measure inverts, check cross sections along US-1 for FDOT. Ongoing general Surveying & Mapping Services Marathon, Florida Drainage survey for the city of Marathon, Fl. To include the recovery/ reset of primary network control, location of all drainage structures, measure inverts, check cross sections along US-1 for FDOT. 2008 59 l. 19. RELEVANT PROJECTS (CONT.) j. i. h. k. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 PAblO DOMiNguez general Surveying & Mapping Services Pompano Beach, Florida Location and elevations of all drainage structures within the city of Pompano Beach including inverts, pipes and boxes material and sizes for drainage study to improve drainage system. For the city of Pompano Beach, FL. 2012 general Surveying & Mapping Services Islamorda, Florida Drainage survey for the city of Marathon, Fl. To include the recovery/ reset of primary network control, location of all drainage structures, measure inverts, check cross sections along US-1 for FDOT. Ongoing Margate - Vinson Park Margate, Florida Survey Technician for the Boundary & Topographic Survey for Margate Vinson Park, 5790 Margate Boulevard, Margate, being all of Parcel A of the plat of MARGATE COMPLEX, Plat Book 172, Page 46, B.C.R., Parcel ID of 4841-36-24-0010. Location of all above- ground improvements within the parcel and including the one-half right-of-way of the adjacent roadways with horizontal locations and vertical elevations being obtained for such items as sidewalks, edge of pavement, concrete curb, ball fields, buildings, parking lot striping, fences, driveways and visible above-ground utilities. 04/2020 60 c. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete One Section E for Each Key Person.) 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE 19. RELEVANT PROJECTS a. b. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 SANDRA Lee SANDRA LEE, AICP CEP, CFM, LEED AP BD Calvin, Giordano & Associates, Inc. M.A. Biology/ecology, Magna Cum Laude AICP CeP B.A. Biology/Botany, Manga Cum Laude LeeD AP BD+C / CFM US-07579 Fort Lauderdale, FL St. Cloud State University, St. Cloud, MN No. 018627 St. Cloud State University, St. Cloud, MN No. 10215598 Ms. Lee has over 30 years of professional experience & heads up CGA’s Env. Dept. coordinating regulatory permitting, env. planning, site assessment, resource management & env. technical support services. In general, Ms. Lee provides permitting services for env. resources permits at the local, state & federal level, coordinates interagency & multi-disciplinary team efforts, provides the most feasible dev. & mitigation options, probable costs for mitigation options, provides tree mitigation plans & tree removal permitting services, conducts wetland delineations & wetland functional assessments, prepares Coastal & Conservation Elements for Comprehensive plans, coordinates on Comprehensive Plan Evaluation & Appraisal Reports (EAR) & EAR based amendments, designs wetland mitigation areas, provides bidding & const. oversight services for the const. & installation of mitigation areas, provides technical support, provides env. resource management & environmental planning services to municipalities, provides floodplain management assistance & annual CRS reporting, provides annual NPDES reporting, manages field staff conducting wildlife & habitat assessments, imperiled species surveys & compliance monitoring reporting. ENVIRONMENTAL SPECIALIST 30+20 City Center Parking Pembroke Pines, Florida Responsible for environmental permitting, including the site assessments, wetland assessments and obtaining a US COE, a County and a South Florida Water Management District permit for the development site and for a newly constructed off-site mitigation area. Nearly the entirety of the development site was wetland and was comprised of multiple habitat types and qualities; also developed the mitigation plan for the conversion of an offsite golf course to wetland habitats. The development fell within an FPL power line easement requiring additional coordination and approvals with FPL. The US COE permit required purchasing mitigation bank credits. Economic developments in 2014 lead to the City selling the off-site golf course. Worked with the City to release the recorded conservation easement and obtain new permits to allow the City to build the parking facility within the FPL easement with a combination of mitigation bank credits and off- site mitigation at another location. 2008 2012 Lloyd estates Residential Improvements Oakland Park, Florida CGA was retained by the City of Oakland Park to address flooding issues in an older residential neighborhood. The project involves the installation of swales/exfiltration trenches, piping and other improvements within the upland public right of ways. The project also involves the installation of two (2) new outfalls into the Sleepy River; dredging, a new sluice gate and new seawalls in the river; the construction of a pump station and the creation of a bio-swale/river overflow area within property adjacent to the river. CGA environmental staff conducted all site assessments for permitting, designed the bio-swale stormwater overflow area, and processed permits through the U.S. COE, the SFWMD and Broward County. Permitting challenges with this project included close coordination with the SFWMD operations staff on project interactions with the C13 canal, also amending a sovereign submerged lands lease for newdredge areas. CGA’s fees: $520,000. 2013 Ongoing Drainage Improvements Weston, Florida Conducted the site inspections and obtained permits from the US COE, the County and SFWMD for drainage enhancements. 2012 2016 61 h. 19. RELEVANT PROJECTS (CONT.) f. e. d. g. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 SANDRA Lee Drainage Improvements Surfside, Florida Tracked all expenditures and processed and obtained all grant disbursement funds for the City for two Florida Department of Environmental Protection grants. 2012 - 2018 Sanitary Sewer Improvements Surfside, Florida Tracked all expenditures and processed and obtained all grant disbursement funds for the City from a Florida Department of Environmental Protection grant. 2012 - 2018 Bonaventure Pump Station and Drainage Improvements Weston, Florida Tracked all expenditures and processed and obtained all grant disbursement funds for the City from a Florida Division of Emergency Management Hazard Mitigation grant, a South Florida Water Management District grant, and a Florida Department of Environmental Protection grant. Compiled the grant final report and closed out the Florida DEM grant. 2007 - 2017 Public Lands Irrigation Weston, Florida Obtained a water use permit from the South Florida Water Management District for nearly 1,000 acres of irrigated public land. Also obtained a modification to this permit. 2014 Drainage Improvements Hallandale Beach, Florida Responsible for all site assessments and obtaining permits through the US COE and Broward County; Broward County reviewed and issued the SFWMD permit through the delegation agreement. The project involved the installation of a sluice gate, and new seawalls and involved the construction of a pump station within man-made City owned canal. 2016 2018 62 m. 19. RELEVANT PROJECTS (CONT.) k. j. i. l. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 SANDRA Lee Dania Beach Basin 5 Dania Beach, Florida CGA designed a unique stormwater improvement system for the City to benefit both the developed and adjacent natural habitats. CGA has conducted all the site and wetland functional assessments for permitting and has processed permits through the ACOE, the South Florida Water Management District and Broward County. Permitting required extensive negotiation with various Divisions of Broward County including the development of an Agreement with the County and City for use of the County land, and approval by the County Commission. The construction of the Bio-swale did require unavoidable impacts to wetlands; however, the design plan within the swale included removal of all exotic vegetation, excavation of marginal wetland habitat with revegetation, and increased hydrology to low quality wetlands thereby creating enhancements with a greater functional gain than the functional loss through the impacts. CGA’s fees: $236,000. 2007 2015 Dania Cove Park Dania Beach, Florida CGA was retained by the City to develop a waterfront park design on an archeologically significant site containing a scenic mangrove cove, located along the Dania Cut-off canal. The park design included a fishing dock & platform, picnic pavilions & an exercise path. Native plantings were used to eliminate the park’s need for permanent irrigation, and plants were selected for their educational opportunities including highlighting the butterfly attracting varieties. The scope included designing a stabilization system for a badly eroded and unstable shoreline embankment along with vegetating the shoreline; designing informational kiosks featuring the historic Native American midden and the site’s natural resources; and obtaining all required permits for the installation of the site features. The scope also included coordinating with the County and State on gaining approval for the site design, tracking all expenditures and processing and obtaining all grant funds for the City, from the State and County and closing out the grants and permits. CGA’s fees: $103,000. 2011 2012 George english Park Fort Lauderdale, Florida CGA provided a design plan to demolish and replace aging boat ramps to accommodate larger vessels and provide floating docks on each side of the ramps that are longer than the previous fixed docks. An additional floating dock was also added to an existing docking facility on the northern side of the basin to accommodate other park recreational activities. CGA conducted all site inspections designed a shoreline mangrove planter, processed and obtained all required environmental permits. 2016 2019 A-1-A Improvements and Bike Lanes Jupiter, Florida Obtained environmental permits, conducted the site assessments, including shoreline and submerged aquatic vegetation surveys, for new outfalls into the Lake Worth Creek Aquatic Preserve, which is recognized as Outstanding Florida Waters. Conducted the investigations to complete and submit the environmental LAP documentation. 2007 - 2014 Resiliency Planning Surfside, Florida Created a Climate Crisis document outlining the current and projected conditions and projections by time frame; a local and regional overview; a review of shocks, stresses and vulnerabilities; a resource list; and strategic next steps to aid the Town in defining where they want to be how they will get there. Also developed a Climate Action Plan containing feasible, tangible planning policies and actions relating to operations, codes, coordination and public outreach. 2019 63 c. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete One Section E for Each Key Person.) 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE 19. RELEVANT PROJECTS a. b. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 DRew LiNDeMANN DREW LINDEMANN Calvin, Giordano & Associates, inc. Master in Soil and water Science Bachelor in Science in Landscape and Nursery Manager Fort Lauderdale, FL University of Florida, Gainesville, FL University of Florida, Gainesville, FL Mr. Lindemann is responsible for providing Arborist and Landscape plan review services for several municipalities. He is also responsible for performing habitat assessments, wetland delineations, endangered species surveys, mitigation construction oversight, contract administration, and contract management and compliance monitoring for projects impacting environmentally sensitive lands. Mr. Lindemann has provided landscape inspections and arborist review services for the Town of Davie and the Cities of Deerfield Beach and Tampa over the past few years. He has an excellent ability to work with municipal residents and commercial property owners to resolve landscape issues. He is very detailed oriented and is familiar with the technology required to accomplish the tasks required for municipal reviews. He has provided oversight of the exotic and invasive plant control contract on over 2,200 acres of sensitive wetland mitigation lands in the City of Weston that are known habitat to listed species such as the Everglade Snail Kite, Wood Stork, and American Alligator populations. ENVIRONMENTAL SPECIALIST 16 6+ City Center of Pembroke Pines Pembroke Pines, Florida Environmental Specialist. Conducted construction inspection for landscape installation for new parking facility, reviewed the mitigation for a created wetland and worked with City staff for approvals. 2018 Palm Aire Pompano Beach, Florida Environmental Specialist. Conducted ISA tree valuations, and provided mitigation requirements to meet the City’s code. 2017 Boulevard of Champions North Lauderdale, Florida Environmental Specialist. Conducted tree inventory, inspections, tree valuations, and landscape inspections. 2017 iSA Certified Arborist FL-5581A 64 h. 19. RELEVANT PROJECTS (CONT.) f. e. d. g. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 DRew LiNDeMANN Landscape Plan Review and Arborist Services Tampa, Florida Calvin, Giordano & Associates, Inc. (CGA) was contracted by the City of Tampa to provide Arborist services and Landscape Plan Review. CGA provided an environmental specialist to review wetland projects as well as a Landscape Plan Reviewer to assist the City with required landscaping for new and renovated land development projects. CGA provided review and approval of planting plans for site plan development, inspected construction sites to ensure compliance with approved tree protection plans, prepared reports, processed associated paperwork and data entry, and worked with individual developers, builders, homeowners, and other customers to assist in ensuring compliance with the City’s landscape code and tree protection ordinance. 2019 Phillips Plat Collects the field data, complies and submits the monitoring reports for 8.6 acres of tidally influences mangrove habitat recognized as a Local Area of Particular Concern by Broward County. The site required the installation of flushing canals within the mangrove habitat, hand clearing of invasive species, and the construction of a bermed freshwater storm water management area within the mangrove habitat.s Miramar Pinelands Miramar, FL Collects the field data, complies and submits the monitoring reports for 31.9 acres of wetland restoration located on Broward County Park land at the historic head of the Snake Creek slough, containing open water and wet prairie habitat. North Shore Oceanview Park Miami Beach, Florida Environmental Specialist. Conducted tree inventory and vegetation survey, which was reviewed by Miami-Dade County. 2018 65 c. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete One Section E for Each Key Person.) 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE 19. RELEVANT PROJECTS a. b. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 TAMMy COOk-WeeDON TAMMY COOK-WEEDON, PLA, LEED AP+C Calvin, Giordano & Associates, Inc. B.S. Landscape Architecture, 1987 Registered Professional Landscape Architect Florida LeeD AP BD+C Fort Lauderdale, FL Texas A&M University College Station No. 0001328 No. 10066306-AP-BD+C Ms. Cook-Weedon leads the Landscape Architectural staff, has over 33 years of landscape architectural experience with demonstrated strengths in creative design, graphic presentations, and planting design. She has successfully completed numerous large-scale projects, which encompassed design studies, planting designs, natural area development and the various inter-related professions and tasks necessary to manage the projects through to completion. Ms. Cook-Weedon manages a staff of eleven at CGA where she provides scheduling, addresses CAD staffing and directs design issues as well as monitors budgets and serves on the Executive Management team. LANDSCAPE ARCHITECT 33 23 Mills Pond Park: Soccer/Lacrosse Fields Fort Lauderdale, Florida Developed a plan to build 3 new synthetic turf soccer and lacrosse fields at Mills Pond Park, including coordinating surveying, civil engineering, electrical engineering, site planning, landscape architecture, and all of the sub-consultants on the project. The design of the new fields will include drainage, lighting, and irrigation as well as associated parking, walkways, and landscape improvements. CGA’s fees: $379,000. Construction cost is estimated at $3.3 million 2016 2019 Soccer Field Conversion at Weston Regional Park Weston, Florida Ms. Cook-Weedon managed staff of the landscape architecture department to convert four of the City’s existing grass soccer fields to synthetic turf fields. These conversions will be the first of two park field conversions in the city. The selected synthetic turf option uses an organic infill material rather than the standard black rubber material. Early test results indicated players raving about the playing surface. Services included Civil Engineering as well. Cost: $350,000.00 Construction cost estimated at $3.5 million. 2014 - 2016 2018 Middle Beach Recreational Corridor Miami Beach, Florida Landscape Architect of Record – CGA oversaw coordination of all engineering & environmental efforts associated this 2-mile long linear multi-use trail project on State-owned lands, as well as was responsible for all planting & hardscape design & public outreach. CGA designed & permitted an on-grade, ADA-accessible pathway that supports the use of pedestrians & cyclists. The project is a part of the greater Atlantic Greenway Network & comprises a critical component of the bicycle facilities throughout the City. It connects Indian Beach Park on the south to the North Beach Recreational Trail at Allison Park with a 2-mile paver walkway, continuing the City’s unique branding qualities. Conducted one-on-one meetings with over 39 condominium properties to gather support for the project, respond to resident’s concerns, & address design restrictions set forth in the FAC & balance those against resident’s expectations. CGA successfully shepherded the project through all State & local agency permitting processes. Cost: $534,000.00. Const. Cost Estimated at $13.2 M 2013 2014 66 h. 19. RELEVANT PROJECTS (CONT.) f. e. d. g. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 TAMMy COOk-WeeDON Joe DiMaggio Children’s Hospital Visitor’s Clubhouse Hollywood, Florida Prepared the site and landscape design for a restorative garden with a playground area specifically for the use by children users of the Joe DiMaggio facility. Cost: $250,000 Construction cost is estimated at $2.5 million. 1995 2000 Hickory Point Recreational Facilities Tavares, Florida Landscape Architect. The project consisted of the site design of a waterfront park that included marinas, boat ramps, wetland educational boardwalks, environmental signage, fishing stations and a communal pavilion. Cost: $220, 000.00. Construction cost estimated at $2.5 million 1992 1996 Deering estate at Old Cutler Palmetto Bay, Florida Historical restoration and landscape design to repair the damaged areas of the estate following Hurricane Andrews devastation of the property, including detailed archeological planting design, habitat restoration and planting design for a new visitors’ facility. Cost: $28,000.00. Construction cost estimated at $2.8 million. 2003 2008 Miami Beach - North Beach Oceanside Park Miami Beach, Florida Landscape Architect of Record, oversaw the programming and design of the project site, conducting the necessary public outreach to gather Commission approval and coordinating important aesthetic and sustainable improvements with engineering needs of the project. CGA was responsible for the conceptual design of all material selections and palette, retaining walls, fences, lighting, branding elements, and planting. Ms. Cook-Weedon provided assistant by overseeing the permitting process, addressed value engineering issues and provided shop drawing reviews. Cost: $840,000.00 Construction cost estimated at $11.5 million. 2016 - 2020 2020 Delray Beach Fire Rescue Headquarters Plaza Delray Beach, Florida Senior Landscape Architect. Designing and permitting improvements to pedestrian at the SE corner of the Fire Rescues Headquarters Building for the City of Delray Beach and the CRA. Project includes on the creation of a pedestrian plaza which will feature public art. A detention area will be resized to accommodate the plaza requiring the creation of retaining and seat wall to replace the lost water quality volume. Ms. Cook-Weedon provided assistant during the project construction. She addressed shop drawing reviews, RFI’s and provided frequent site visits to address issues with the contractor. Cost: $18,000 Construction cost estimated at $800,00. 2015 - 2017 2017 67 m. 19. RELEVANT PROJECTS (CONT.) k. j. i. l. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 TAMMy COOk-WeeDON Vista Park Weston, Florida CGA developed the master plan for Vista Park, which is adjacent to Cypress Bay High School. With four soccer fields and four baseball fields, this park is well utilized by Weston residents as well as the high school. Special detailing of the edges of the fields were designed to address the clay and sod areas by creating header curbs to separate those areas. The design, construction documents and construction administration was provided by CGA. Cost: $5.5 Million. 2009 kane Concourse Beautification Bay Harbour Islands, Florida Landscape Architect: Responsible for the oversight of hardscape and planting of streetscape improvements for the Town’s business district, including street furnishings, wayfinding, and irrigation. 2010 N/A Delray Beach Ne 2nd Avenue Delray Beach, Florida As a subconsultant to Wantman Engineering, CGA provided professional services for Landscape Architecture and Electrical Engineering Streetscape enhancements were provided from Lake Ida Rd. to George Bush Blvd. Decorative street lighting as well as date palms were designed to complement the historic neighborhood of Delray Beach. 2016 Delray Beach SW 2nd Street Delray Beach, Florida As a subconsultant to Wantman Engineering, CGA coordinated the bulb-out locations with the Civil Engineer. Roundabouts were developed for Traffic Calming. Landscape Streetscape enhancements provided beautification in the South West neighborhood. The project extended from Swinton to SW 15th Avenue. Construction Cost: $408,000 2014 Sombrero Beach Park Marathon, Florida CGA redesigned the park to expand its programming for recreational uses, enhance its environmental condition as a turtle nesting habitat, and provide new on-site amenities that were sensitive to the architectural character of the Florida Keys. The redesign for the park expanded the program for the park to include extensive, walkable circuits for pedestrian use, children’s playground and play equipment, restroom facilities, new gateway and controlled access features, added picnic shelters, volleyball courts, and multiple-use open public spaces that lend themselves to the personalization of the park by the visitors. Cost: $230,000.00 Construction cost estimated at $2 million. 2003 2005 68 c. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete One Section E for Each Key Person.) 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE 19. RELEVANT PROJECTS a. b. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 GiANNO FeOli GIANNO FEOLI Calvin, Giordano & Associates, inc. Master of landscape Architecture B.A. in Architectural Studies Fort Lauderdale, FL Florida International University, Miami, FL Florida International University, Miami, FL Mr. Feoli leads the Landscape Department in creative design strategies for urban environments with specialties including urban design, contextual analysis and branding. He will contribute his experience in providing detailed site design, large-scale redevelopment planning, and graphic communication services. His experience has encompassed a wide array of project-types, and his strengths lie in park design, streetscapes and urban redevelopment, and form-based urban designs and planning strategies. LANDSCAPE URBANIST 25 18 Middle Beach Recreational Corridor - Phase ii Miami Beach, Florida Lead Designer: responsible for coordinating all engineering and environmental efforts associated this 2-mile long linear multi-use trail project on State- owned lands, as well as responsible for all planting and hardscape design and public outreach. Conducted one-on-one meetings with over 39 condominium properties to gather support for the project, responded to residents’ concerns, and addressed design restrictions set forth in the Florida Administrative Code and balance those against resident’s expectations. Responsible for coordinating with all State and local permitting agencies CGA’s fees: $534,000. 2011 2019 Oakland Park Station Oakland Park, Florida Responsible for all conceptual design, site, design and construction detailing of a public plaza at the terminus of the City’s culinary district. The design effectively created flexible public environment that could be used as event spaces and could accommodate the needs of the City in continuing its adopted branding through the use of elements, furnishings, paver palettes and landscape lighting. The project’s challenging shallow dimensions required innovative solutions to address ADA access to adjacent buildings while maximizing opportunities for the use of space, addressed through the creation of large stage settings that served as landings and allowed for public engagement and interaction. CGA’s fees: $25,000. 2012 2014 98th Street Park Bay Harbor Islands, Florida Responsible for all public outreach, site design, construction detailing, and planting design of a neighborhood passive park. The park includes a small dog park area, flexible open space, children’s play areas, an interactive water feature and a restroom facility. Designed the splash pad, play areas, and landscaping. Coordinated the design of the restroom facility and facilitated all necessary public outreach through both the Parks and Recreation Committee and the Town Council. CGA’s fees: $42,000. 2013 2014 69 h. 19. RELEVANT PROJECTS (CONT.) f. e. d. g. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 GiANNO FeOli Beachwalk Master Plan Surfside, Florida Lead Designer responsible for the conceptualization and master plan of a 1-mile linear park as a erosion control strategy and connecting all street-end plaza components with access to the beach. This project included dune and turtle habitat restoration, branding sculptures, salt-tolerant plantings, public art branding components, and specialty paving design. Also responsible for all public outreach associated with the project. CGA’s fees: $60,000. 2006 N/A Rolling Oaks Park Wayfinding Sign Package Miami Gardens, Florida Developed a signage and wayfinding package to provide identification and orientation to users. The signage package was developed as an interchangeable modular system that could be easily customized to meet the unique needs of other park and public amenity areas and that could be placed on project sites as well as within the public ROW. The design was heavily influenced by concerns of safety and its ability to withstand graffiti and vandalism. CGA’s fees: $140,000. 2008 2012 92nd Street Park Bay Harbor Islands, Florida Lead Designer responsible for all public outreach, site design, construction detailing, and planting design of a 2-acre urban community passive park. The park includes a small dog park area, flexible open space, outdoor exercise areas, ample shaded seating, parking, furnishings, and urban plaza and solar- powered security lighting. This project was designed, engineered, detailed and constructed on a fast-track to meet very restrictive deadlines of grant funding that had been previously secured by the Town. CGA’s fees: $40,000. 2008 2010 Doral Boulevard Beautification Master Plan Doral, Florida Lead Designer responsible for crafting a streetscape and urban design master plan for Doral Boulevard envisioned as the primary emblem of the City. Responsible for designing all landscape and planning components of the project, which created distinct planning ‘character’ zones that would impact relationships of the built environment with the resultant quality of spaces being generated, the creation of dedicated public realm components and design standards for each, access management design recommendations, signage and gateway features, and identifying architectural relationships to improved sidewalk design and parking design recommendations. This document and its vision has been the guiding document for all areas abutting the Boulevard and has been used by the City as a contributing guide for the development of Downtown Doral, focused on safe, pedestrian-friendly, high-quality environments. 2004 2013 lloyd estate Pocket Park Project Oakland Park, Florida Responsible for the programming and design of the project site, conducting the necessary public outreach to gather Commission approval and coordinating important aesthetic and sustainable improvements with engineering needs of the project. Also responsible for the conceptual design of all material selections and palette, retaining walls, fences, lighting, branding elements, and planting. CGA’s fees: $65,000 2011 2019 70 m. 19. RELEVANT PROJECTS (CONT.) k. j. i. l. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 GiANNO FeOli 174th Street Park Bridge Vision Package Sunny Isles Beach, Florida Project Manager/Lead Designer: Responsible for the conceptualization of the bridge and managing the development of all needed graphics to convey the project. Responsible for obtaining a pre-acceptance of the design approach from FDOT-District 6 for an open-air, elevated pedestrian bridge designed more as a park than a caged walkway; Responsible for obtaining acceptance from FDOT for developing a design strategy that did not require the use of metal fencing enclosures; Responsible for all public presentations to the community and to the commission for feedback and approvals. 2019 N/A SW 2nd Ave Himmarshee District Streetscape Fort Lauderdale, Florida Project Manager/Lead Designer: Responsible for conceptualizing the streetscape and developing a strategy that reinterpreted the streetscape into an ‘event space’ that was supportive of the existing restaurants and nightclub and bars located in the area. As such, the streetscape was redesigned as a curbless ‘woonerf’. Responsible for the coordination and development of all construction documents. Responsible for coordinating all construction administration support efforts with the Client’s third-party CEI consultant. 2018 2019 Urban Forestry Master Plan Miami Beach, Florida Account Manager/Lead Urbanist: Responsible for the development of a city-wide strategy to implement constructability components of the urban forestry master plan through the development of a ‘tool kit’. The ‘tool kit’ satisfied the Planning Department’s needs to establish a city-wide hierarchy for street tree types, establishes standards for incorporating green infrastructure in the planting of city trees, establishes standards for soil volume calculations and stresses the need to have those accounted for during the scoping and budgeting processes, provided for appropriateness of canopy specie selection for good resilient diversity, and provided constructatbility details to be incorporated into the Public Work’s set of standards. Ongoing N/A Middle Beach Recreational Corridor - Phase iii Miami Beach, Florida Account Manager/Lead Designer: Responsible for coordinating all design, engineering and environmental efforts associated the replacement of the existing wooden boardwalk with an on-grade, paver pathway, as well as responsible for all planting and hardscape design. Additionally, the project included the redesign of 11 street ends to provide ADA accessibility, seating areas and beach shower facilities. Participated in one-on-one meetings with all properties prior to construction, responded to residents’ concerns, and addressed design restrictions set forth in the Florida Administrative Code and balanced those against resident’s expectations. Responsible for coordinating with FDEP, FWC, and City of Miami Beach Departments in obtaining all necessary permits; was capable of getting all above- ground pedestrian pole lights approved by FWC. 2015 Ongoing North Beach Oceanside Park and Beachwalk Miami Beach, Florida Account Manager/Lead Designer: Responsible for implementing the vision for the park that was collaboratively arrived at in a partnership with West 8. Responsible for the coordination of all City-departments’ request and working closely with CIP staff in the separate development and permitting of the beachwalk component. Responsible for successfully obtaining a CCCL permit for both the park and the beachwalk separately through FDEP and FWC; was capable of getting all above-ground pedestrian pole lights approved by FWC. 2015 71 c. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete One Section E for Each Key Person.) 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE 19. RELEVANT PROJECTS a. b. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 MichAel cONNeR MICHAEL D. CONNER, ASLA, PLA, ISA calvin, Giordano & Associates, inc. BSlA Registered landscape Architect Florida B.S., environmental Design iSA certified Arborist, Florida Fort Lauderdale, FL Ball State University, Muncie, IN No. LA0001181 Ball State University, Muncie, IN No. FL0777 Professional Associations: American Society of Landscape Architects Chairperson 1990 Broward Section; Florida Urban Forestry Council President 1999; Landscape Inspectors Society of Florida; International Society of Arboriculture. LANDSCAPE ARCHITECT 30+15+ lift Station #21 - Reconstruction Cooper City, Florida Project Landscape Architect: Prepared design renderings, construction drawings, and bid specifications for the landscape and irrigation improvements for the relocation and reconstruction of an existing lift station in the Rock Creek community of Cooper City. This included assessing the existing trees, providing a tree preservation plan, and then working with the existing trees and landscaping to prepare a new planting design that would effectively screen the new lift station and blend it into the look and aesthetic of the community. 2016 - 2018 2018 Natalie’s cove/Flamingo Gardens - Drainage improvements Cooper City, Florida Project Landscape Architect: Team member responsible for inventorying all the existing trees within the project limits and preparing root management plans, construction drawings, and bid specifications for the preservation of those trees. This included overseeing all root pruning and tree canopy pruning activities before and during construction. The design also included the installation of new littoral shelf plantings around the portions of the lake that were excavated to increase the drainage capacity for the surrounding neighborhoods. 2018 - 2019 2019 city Arborist / Urban Forester Cooper City, Florida Served as the City’s Landscape Architect and City Arborist for ten years and supervised the development and expansion of the City’s Urban Forestry Program. Secured numerous Urban & Community Forestry Grants to conduct a tree inventory and prepare an Urban Forestry Master Plan for the City, as well as several tree planting projects and public information seminars to educate the residents on the City’s Urban Forestry Program. The tree inventory included over 15,000 trees utilizing a software program from ACRT, Inc. and resulted in the development of a Work Order program for scheduling and tracking tree pruning activities. 1990 - 2000 72 h. 19. RELEVANT PROJECTS (CONT.) f. e. d. g. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 MichAel cONNeR Mills Pond Park: Soccer/lacrosse Fields Fort Lauderdale, Florida Developed a plan to build 3 new synthetic turf soccer and lacrosse fields at Mills Pond Park, including coordinating surveying, civil engineering, electrical engineering, site planning, landscape architecture, and all of the sub-consultants on the project. The design of the new fields includes drainage, lighting, and irrigation as well as associated parking, walkways, and landscape improvements. Construction cost is $3.7 million, with completion scheduled for February, 2018. 2015 2018 Parks Bond - construction Management Miami Gardens, Florida Project Manager, Lead Designer – Assisting the City staff with the implementation of a $60 million bond program for parks improvements. This includes conceptual site designs, cost estimates, and development of all design-build standards and specifications for 14 parks city-wide. Five of the parks in Phase One of the program are currently under construction, and another five parks have been designed and are in the site plan approval. 2014 Ongoing Peace Mound Park Weston, Florida Project Manager, Lead Designer - Responsible for the design detailing and construction administration of a waterfront passive park with the purpose of ensuring celebrating the existence of an archaeological Tequesta Indian burial mound. Mr. Conner was responsible for conducting an audit of over 200 existing trees, determining their health and relocation parameters and coordinating the mitigation of any vegetation that needed to be removed. 2012 2014 Andrews Avenue improvements - Transportation enhancement Grant Oakland Park, Florida Lead Designer - Developed a new planting and irrigation design for the major improvements to the Broward County roadway through the City of Oakland Park as part of a Broward MPO Grant. Mr. Conner was responsible for all permitting and coordination of approvals through various agencies, as well as the City of Oakland Park’s review process. The design for the roadway includes new medians, reduced lane sizes, and new bike lanes in addition to the landscape enhancements. 2017 2019 SR A1A - Beautification Grant Fort Lauderdale, Florida Project Manager, Lead Designer - Prepared construction drawings and bid specification for the landscape and irrigation improvements in the medians on S. R. A1A south of East Oakland Park Boulevard. This included implementing a Florida Highway Beautification Council grant and obtaining all approvals of the plans from FDOT. The design intent was to transform this section of S.R. A1A to a more updated look by removing some old existing Black Olive trees and planting mature Coconut Palms. 2015 2017 73 m. 19. RELEVANT PROJECTS (CONT.) k. j. i. l. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 MichAel cONNeR John U. lloyd State Park - Boardwalk Replacement Florida Department of Environmental Protection (FDEP) Lead Designer - Responsible for the design and detailing for the construction of three new boardwalk replacements at various beach access locations within the Park. Coordinated with the Environmental Specialist on the Environmental Permitting for the oceanfront beach park in Hollywood, Florida, and the civil and structural engineers on the design and specifications for the boardwalks. This included utilizing the existing piles and coordinating the replacement of the wood deck with the recycled decking material and vinyl wire mesh on the sides per the FDEP standards. 2015 2016 Regional Park - Synthetic Turf Fields Weston, Florida Contributed to the preparation of the construction drawings and bid documents for the conversion of two existing soccer fields at Weston’s Regional Park to synthetic turf fields with organic infill material. This included supervision the design of irrigation system and the required electrical design and power supply for the booster pump to be able to periodically wet the fields from the sidelines. 2017 2018 Patch Reef Park - Synthetic Turf Fields Boca Raton, Florida Lead Designer - Contributed to the preparation of the construction drawings and bid documents for the conversion of three existing football/lacrosse/soccer fields at Patch Reef Park to synthetic turf fields for the Boca Raton Beach & Parks District. This included tree relocations, new landscaping and design of the irrigation system and the required electrical design and power supply for the booster pump to be able to periodically wet the fields from the sidelines. The construction was completed in less than 7 months. 2017 2019 Davie Road Phase i and ii Davie, Florida Lead Designer - Prepared landscape and irrigation design for the new medians as part of a road widening and complete streets project for Davie Road from Nova Drive to I-595. This included coordinating the relocation of several large Royal Palms from the roadway to a few nearby parks in the Town of Davie. 2016 2018 Miami Beach Urban Forestry Master Plan Miami Beach, Florida Lead Arborist – Developed an Urban Forestry Master Plan with the Davey Resource Group. Coordinated with City staff and residents to draft a plan that will be essential in managing the City’s trees in the future, and will establish canopy coverage goals and recommendations for a more sustainable urban forest. 2019 Ongoing 74 r. 19. RELEVANT PROJECTS (CONT.) p. o. n. q. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 MichAel cONNeR Rolling Oaks Park - Pedestrian Trail Miami Gardens, Florida Designed a 1.5 mile long pedestrian trail through Rolling Oaks Park. The trail included new L.E.D. site lighting, fitness equipment, and benches. A custom-designed way-finding signage program was developed for all of the trailheads signs, directional signs, and mileage markers. The design of the trail was carefully laid out so as to not disturb the hundreds of existing like oak trees on the site. The new trial was connected to an existing trial 3/4 mile away through neighborhood signage. 2012 2014 capital improvement Program (ciP) - implementation Weston, Florida Landscape Architect - Contributing team member with City staff responsible for the development and implementation of the City’s 5 and 10 Year CIPs, with an emphasis on the Parks and Recreation components, as well as the Roadway and Landscaping improvements. Designed and assisted with the construction of several municipal buildings, new and existing parks, City-wide tree inventory, streetscape designs, and traffic signage program. 2004 2015 Memorial Regional hospital - 35th Avenue Streetscape Hollywood, Florida Lead Designer - Responsible for the construction detailing of hardscape components and planting for a streetscape design and wayfinding for a re-dedicated roadway segment to the hospital campus as part of this LEED-Gold project. 2011 2012 Pines Boulevard - Beautification Grants - Phase i and ii Pembroke Pines, Florida Project Manager, Lead Designer – Prepared detailed construction drawings and specifications for the landscape and irrigation improvements on two segments of Pines Boulevard east of the Florida Turnpike in Pembroke Pines. This included implementing two Florida Highway Beautification Council grants and obtaining all approvals of the plans from FDOT. In addition, a Design Variance was obtained for the preservation of several existing large Royal Palms located in the medians. 2014 2017 75 c. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete One Section E for Each Key Person.) 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE 19. RELEVANT PROJECTS a. b. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 MARcOS MeNDOzA MARCOS MENDOZA calvin, Giordano & Associates, Inc. A.A. IN ARcHITecTURe Fort Lauderdale, FL Miami Dade Community College, Miami, FL Mr. Mendoza directs the landscape architectural staff in all code compliance and site design issues. His expertise lies in the production and development of several residential communities and large-scale commercial projects. He assists in quality control of project documents through developments in standards and systems consultation. He has also had experience in the development of institutional, educational and healthcare projects. Marcos provides the Irrigation Designs for CGA’s projects. IRRIGATION/SITE DESIGN 24 20 Mills Pond Park: Soccer/Lacrosse Feilds Fort Lauderdale, Florida Developed a plan to build 3 new synthetic turf soccer and lacrosse fields at Mills Pond Park, including coordinating surveying, civil engineering, electrical engineering, site planning, landscape architecture, and all of the sub-consultants on the project. The design of the new fields will include drainage, lighting, and irrigation as well as associated parking, walkways, and landscape improvements. Construction cost is estimated at $3.3 million. CGA’s fees: $379,000. 2014 - 2018 2018 Soccer Field conversion at Weston Regional Park Weston, Florida The City of Weston will be converting two soccer fields to synthetic turf, these conversions will be the first of two park field conversions in the city. The selected synthetic turf option uses an organic infill material rather than the standard black rubber material. These fields will be cooled down with the use of long range rotors specifically designed for synthetic turf cooling & cleaning. Services included Civil Engineering as well. CGA’s fees: $350,000.00. 2016 2018 Football Field conversion at cypress Bay High School Weston, Florida Prepared detailed site plans and irrigation plans for the conversion of an existing turf football field park to synthetic turf. The selected turf option is to use an organic fill material rather than the standard black rubber material. This required a cooling system and for cost saving a specialized booster pump with 4 custom ports where created in order to use a self-reeling watering wheel system. Services included Civil Engineering as well. CGA Fees: $100,000. 2015 2017 76 h. 19. RELEVANT PROJECTS (CONT.) f. e. d. g. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 MARcOS MeNDOzA Memorial West - Bed Tower Addition Pembroke Pines, Florida Developed plans and coordinated details for the hardscape, as well as planting and irrigation design for the major expansion of the Memorial West Hospital facilities. Design of the landscaping and irrigation around the new building addition and main entrance into the hospital, as well as all of the permitting through the City of Pembroke Pines. 2011 2012 Memorial Regional Hospital Data center Hollywood, Florida Developed plans and details for the relocation of vegetation and new planting associated with a data center facility along the boundary areas of the healthcare campus. 2005 2007 Joe DiMaggio children’s Hospital Vistor’s clubhouse - connie’s corner Hollywood, Florida Developed plans and details for the design of a restorative garden with a playground area specifically for the use by children users of the Joe DiMaggio facility. Special attention was made to the creative design process branding and the selection of equipment, furnishing and site design details that accommodated for at-grade-level activities for wheelchair-bound users. The design concept for the park initiated from the checkerboard pattern of a mowed baseball field which influenced the safety surface design and provided a colorful impact for the patients and families of this important facility. 2000 2000 Middle Beach Recreational corridor Miami Beach, Florida Responsible for all irrigation design for a 2-mile long multi-use trail linear park to be constructed on State lands. The irrigation design is consistent with the City’s standards for product selection, specification and maintenance. The system was designed for water conservation strategies and minimal impacts to the environment. CGA’s fees: $534,000. 2012 Ongoing Vista Park Weston, Florida CGA developed the master plan for Vista Park which is adjacent to Cypress Bay High School. With four soccer fields and four baseball fields, this park is well utilized by Weston residents as well as the high school. Special detailing of the edges of the fields were designed to address the clay and sod areas by creating header curbs to separate those areas. The design, construction documents and construction administration was provided by CGA. Cost: $5.5 million. 2002 2006 77 c. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete One Section E for Each Key Person.) 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE 19. RELEVANT PROJECTS a. b. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 MARiA AlONSO MARIA A. ALONSO, NCIDQ, ASID, ASLA Calvin, Giordano & Associates, inc. Master of landscape Architecture B.A. interior Design Studies interior Designer Fort Lauderdale, FL Florida International University, Miami, FL NCiDQ No. 34093 The Art Institute of Fort Lauderdale, FL No. ID6618 Maria Alejandra is a Landscape Design professional, with over five (5) years of experience in landscape design, including park and planting design for both publicly-funded and private projects. She contributes her experience in the creation of communication graphics, 3-dimensional renderings, providing schematic designs, and the development of construction technical drawings. LANDSCAPE DESIGNER 5+3+ North lauderdale Gateway Park North Lauderdale, Florida Landscape Designer, CAD Technician. Developed a design for a linear park for passive recreational use that will include an outdoor fitness area, playground area and a butterfly garden for educational purposes. 2015 - 2016 N/A Tamarind Avenue Streetscape West Palm Beach, Florida CAD Technician. Provided rendering of typical street sections with new planting material along with the selection of site furnishings, lighting and bike racks to improve Tamarind Avenue. 2016 N/A Mills Pond Park Fort Lauderdale, Florida Landscape Designer, CAD Technician. Developed a set of working drawings and illustration boards for the design, permitting, and construction of three (3) new soccer/lacrosse fields at the existing park. 2015 - 2018 2018 78 h. 19. RELEVANT PROJECTS (CONT.) f. e. d. g. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 MARiA AlONSO indian Creek Miami-Dade, Florida Landscape Designer. Developed a preliminary design of conceptual site plan for a promenade focused on enhancing pedestrians’ experiences through ample sidewalks, furnishings, plazas and water features. Performed technical tasks including the preparation of site plan rendering, sections and furnishing selections. 2017 Key Biscayne Civic Park Key Biscayne, Florida Contributing Designer. Developed preliminary site plan designs and performed technical tasks, including the preparation of preliminary site plan and section renderings and illustration boards for the proposed improvements to this park. 2015 - 2016 Betty T. Ferguson Recreational Complex Miami Gardens, Florida Landscape Designer. Prepared preliminary site layouts through schematic and design development phases for the additional parking and other improvements being proposed for the existing athletic facility. 2018 Senior Family Center Miami Gardens, Florida Landscape Designer. Created preliminary layout designs through schematic and design development phases. Developed conceptional site plans for the purpose of soliciting proposals from potential design/build teams. 2018 Windmill Park Coconut Creek, Florida Landscape Designer, CAD Technician. Developed site plans, and prepared construction documents, including construction details and technical specifications for the improvements to this park. 2017 2019 79 c. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete One Section E for Each Key Person.) 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE 19. RELEVANT PROJECTS a. b. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 DOMiNic MAck DOMINIC JAMES MACK III, ASSOC. ASLA calvin, Giordano & Associates, inc. Master of Landscape Architecture Fort Lauderdale, FL Florida International University, Miami, FL Dominic is a Landscape Design professional, with over 3 years of experience in landscape and urban design, including park design and planting design for both publicly-funded and private projects. He contributes his experience in the creation of communication graphics, 3-dimensional renderings, providing schematic designs, fabrication strategies pairing with parametric design, and the development of construction technical drawings. Professional Affiliations: • Associate Member, American Society of Landscape Architects (ASLA) • Member-at-Large for Public Relations and Marketing, ASLA Florida Executive Committee • Leadership Committee, Future Landscape Architects of America LANDSCAPE DESIGNER 3 2+ SW 2nd Avenue Streetscape Project FTL DDA Fort Lauderdale, Florida Contributing Designer: Developed conceptual design through 3-dimensional renderings and other visual communication methods, and performed technical tasks including preparation of site plan drawings, fabrication strategies, and construction document detailing. Contributed to the selection of materials, palettes, lighting and branding elements. Assisted in the review of shop drawings and construction inspections. 2019 2020 Middle Beach Recreational corridor Phase iii Middle Beach, Miami Beach, Florida Contributing Designer: Performed technical tasks including preparation of site plan drawings, fabrication strategies, and construction document detailing. Ongoing Ongoing North Beach Oceanside Park North Beach, Miami Beach, Florida Contributing Designer: Developed a preliminary design of conceptual site plan for the two main gateway plazas and continued developing the park site plan. Performed technical tasks including construction detail drawings of key park entities. Contributed to the selection of materials, palettes, lighting and branding elements. Developed 3-dimensional renderings and other visual communication methods. Ongoing 80 h. 19. RELEVANT PROJECTS (CONT.) f. e. d. g. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 DOMiNic MAck Sunny isles Beach Pedestrian Overpass Study Sunny Isles Beach, Florida Contributing Designer: Developed a preliminary design of conceptual site plan and 3-dimensional modeling. Prepared visual presentations for conceptual strategies for visioning the pedestrian overpass. Technical tasks include: preparation of site plan drawings and 3-dimensional modeling and rendering visualizations. 2018 North Bay Road Pedestrian Bridge Sunny Isles Beach, Florida Contributing Designer: Performed technical tasks including preparation of site plan drawings, fabrication strategies, and construction document detailing. 2018 2016 - 2018 90th and 91st Streetscape Study Cooper City, Florida Contributing Designer: Performed technical tasks including preparation of site plan drawings, fabrication strategies, and construction document detailing. 2017 N/A key Biscayne civic Park Key Biscayne, Florida Contributing Designer: Developed a preliminary design of conceptual site plan for a promenade focused on enhancing pedestrians’ experiences through ample sidewalks, furnishings, plazas and water features. Performed technical tasks including the preparation of site plan rendering, Sections and furnishing selections. Designed and developed fabrication strategies on key sculptural components, including parametric 3-dimensional modeling. Ongoing 81 c. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete One Section E for Each Key Person.) 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE 19. RELEVANT PROJECTS a. b. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 MOhAMeD MAbROuk MOHAMED MABROUK, PE Calvin, Giordano & Associates, Inc. bachelor of Science in Civil engineering Professional engineer - Florida MS in Civil engineering and engineering Management Fort Lauderdale, FL Florida International University, Miami, Florida No. 74614 Florida International University, Miami, Florida TIN #M162554834530 CTQP: QC Manager; Advanced MOT; Asphalt Paving Level 1 & Level 2; Final Estimates Level 1 & Level 2; FDOT LAP Checklist Training; Stormwater, Erosion and Sedimentation Control; BCI Coatings Level 1 & Level 2 CEI SENIOR PROJECT ENGINEER 13 3 bid Pack 9 Infrastructure Improvements Oakland Park, Florida Senior Project Engineer/Contract Administration. The project encompasses approximately 570 acres, the project boundaries are east of Dixie Highway, west of Federal Highway, north of NE 38th Street and south of NE 50th Court. This project includes drainage improvement, water main replacement, sewer force main replacement, rehabilitation of Lift Station B-2, Lift Station #3, Lift Station #4, sidewalk installation, roadway improvements and resurfacing. Cost: $9,640,779.41 2015 2016 NW 110th Ave Road Improvements Coral Springs, Florida Senior Project Engineer. Contract elements included; contract administration, inspection, material sampling and testing for the NW 110th Avenue Bicycle and Pedestrian Project, which narrowed the existing 12-ft travel lanes to 11 ft and constructed a 5-ft wide sidewalk, a 4-ft bicycle lane, drainage structures and curbing. The existing valley gutter was removed & restored, roadway milled and resurfaced, landscaping and irrigation lines repaired. Cost: $1,599,491.63 2017 2018 beach Walk II Phase II (LAP Funded) Miami Beach, Florida Senior Project Engineer. This project consisted of the construction of an ongrade ADA compliant pedestrian paver walkway, with bollard lights, landscaping and irrigation. Other work consists of exotic dune vegetation removal and replacement with dune enhancements such as native 2018 2019 82 h. 19. RELEVANT PROJECTS (CONT.) f. e. d. g. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 MOhAMeD MAbROuk MLk (hammondville Rd) Improvements (from Powerline Rd to Turnpike) Pompano Beach, Florida Project FM#432861-1-58-01 Senior Project Engineer/Contract Administration. Improvements include roadway widening, sidewalk installation, drainage improvements, milling and resurfacing, lighting, median installation, signage, landscaping, irrigation and pavement markings. Cost: $3,554,121.43 2015 2016 expanded Lloyd estates Residential and Industrial Improvements Oakland Park, Florida Senior Project Engineer/Contract Administration. Project includes drainage improvements, water main replacement, installation of flood gates, stormwater pump station and a tidal check valve. The drainage improvements include construction of roadside swales, construction of new stormwater conveyance system piping networks and exfiltration trenches, modification of existing conveyance systems and construction of a new out fall structures. Cost: $7,832,907.90 2015 2016 NW 57th Avenue Roadway Improvements Group FDOT District 6, Florida Assistant Resident Engineer. The contract included roadway widening, culvert installation, major utility work, drainage improvements, signalization improvements, signing, pavement marking, and milling and resurfacing. 2013 2015 Department of environmental Protection; kemp Channel Span Replacement Florida Project FM #418396-1, FDEP Project #FS050 Senior Project Engineer/Contract Administration. Construction of the Kemp Channel Bridge Span replacement and retrofitting, located at approximately Mile Marker 23.5. This project is to be a portion of the Florida Keys Oversea Heritage Trail State Park as described in the approved Trail Master Plan dated August 2000. Cost: $1,868,000.00 2015 2016 83 c. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete One Section E for Each Key Person.) 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE 19. RELEVANT PROJECTS a. b. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 ERik PADRON ERIK PADRON, PE Calvin, Giordano & Associates, inc. Bachelor of Science in Civil Engineering Professional Engineer - Florida MS in Civil Engineering Strucutral Fort Lauderdale, FL University of Florida, Gainesville, Florida No. 59446 Florida International University, Miami, Florida TIN#P3652007214 CTQP: QC Manager; Advanced MOT; Earthwork Level 1 & Level 2; Final Estimates Level 1 & Level 2; IMSA Traffic Signal Inspector Level 1 CEI SENIOR PROJECT ENGINEER 22 1+ Ocala Operations Center; Project FM #435659-2 FDOT District 4 - Ocala, Florida Senior Project Engineer. Widening, milling and resurfacing of the I-75 ramps at SR-200. Also included drainage improvements, lighting, signalization, earthwork, guardrail, barrier wall, curb and gutter, ADA improvements including sidewalks & ramp reconstruction, landscaping, temporary traffic control and signal detection, litter removal, and mowing. MOT with 11 phases. 2018 2018 Hard Rock Stadium Pedestrian Bridges and Tunnels Miami Gardens, Florida Senior Project Engineer. 2 pedestrian bridges over TPK exit ramp & NW 199 St,2 tunnels under Don Shula Dr. Included: pile foundations, MSE walls, drainage improvements, lighting, signalization improvements, signage & pavement markings, precast concrete, curb & gutter, ADA sidewalk/ramps,landscaping,sod,irrigation,parking lot resurfacing, striping, and signing. plus pre-stressed, pre-cast concrete tunnel segments, sheet piles. Super Bowl 2019. Cost $17 Million 2018 2019 Collins Avenue (SR A1A) Decorative Lighting (from Bayview Dr to 192nd St) Sunny Isles, Florida Senior Project Engineer. Project includes the removal of existing conventional lighting poles, installation of new pole foundations or rehabilitation of existing pole foundations,installation of new decorative poles, installation of electrical conduits and wires and MOT supervision. Cost: $4,830,000.00 2019 2019 84 h. 19. RELEVANT PROJECTS (CONT.) f. e. d. g. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 ERik PADRON (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firm (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firm Sebring Operations Center; SR-70 Widening in Okeechobee County FDOT District 1, Florida Sebring Operations Center; SR-70 Widening in Okeechobee County (from NE Avenue to St. Lucie County line). Resident Engineer. 8.1 miles of roadway widening from two lanes to four lane divided highway, building seven retaining ponds, drainage, sidewalk and driveways. Contributions included helping along project progress, resolve disputes, enforce CPAM, documents and timely submittals. Involved with resolving materials and field issues, recommendations, and worked with the staff to negotiate open issues. 2015 2016 Sebring Operations Center US-27 Bridge Rehabilitation FDOT District 1, Florida Resident Engineer. Improvements consisted of dredging on Lake Jackson, Sebring and rehabilitation of three bridge locations, under bridge channel excavation, and under bridge rip-rap relocated by hand and with conveyor equipment. 2015 2016 85 c. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete One Section E for Each Key Person.) 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE 19. RELEVANT PROJECTS a. b. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 HugO DASilvA HUGO DASILVA, PE Calvin, giordano & Associates, inc. Bachelor of Science in Civil Engineering, Polytechnic Professional Engineer - Florida Professional Engineer - Puerto Rico Fort Lauderdale, FL University Hato Rey, Puerto Rico No. 73249 No. 11999 TIN#D241325671890 CTQP:Asphalt Paving Level 1;Asphalt Paving Level 2;Earthwork Level 1;Earthwork Level 2;ACI Concrete Field Testing 1;Drill Shaft;Final Estimates Level 1;Final Estimates Level 2; Advanced MOT;LIMS Training; Nuclear Gauge Safety;IMSA Traffic Signal Inspector Level 1;OSHA 10hr; Stormwater, Erosion and Sedimentation Control PROJECT ADMINISTRATOR 25 5 SW 36th Avenue Sidewalk improvements; FM #431715-1-58-01 Pompano Beach, Florida Project Administrator/Senior Inspector. The project scope includes the installation of a sidewalk along the west side of SW 36th Avenue commencing on the south end of Canal “A” north to Palm Aire Drive, a pedestrian flashing beacon crosswalk at the intersection of SW 36th Avenue and Gateway Drive, storm drainage construction, demolition, utility work, and permanent signage & striping. Cost: $628,755.50 2016 2017 NW 110th Avenue Road improvements (lAP Funded $1,495,915.00) Coral Springs, Florida Project FM # 435088-1-58-01 Project Administrator. Project elements included narrowing existing 12-ft travel lanes to 11 ft and constructing a 6-ft wide sidewalk, a 4-ft bicycle lane, drainage structure installation and curbing, valley gutter was removed and restored. Roadway was milled and resurfaced, landscaping, sidewalk and irrigation lines repaired. All improvements were constructed within City of Coral Springs right of way (ROW). Cost $1,599,491.63 2017 2018 victoria Park Ph A (Project No. 10850) & victoria Park Ph B (Project No. 11901) Fort Lauderdale, Florida Project Administrator. Elements include; installing approximately 60,000 feet of 6-inch and 8-inch watermain to replace existing 2-inch mains, including new fire hydrants, service connections to each home, & repaving of the roads impacted by the watermain improvements. Also includes all restoration to landscaping, lawns, pavers, etc. that may have been disturbed due to the work. Cost $11 Million 2019 2019 86 h. 19. RELEVANT PROJECTS (CONT.) f. e. d. g. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 HugO DASilvA Bid Pack 9 infrastructure improvements Oakland Park, Florida Project Administrator/Senior Inspector. The project encompasses approximately 570 acres, the project boundaries are east of Dixie Highway, west of Federal Highway, north of NE 38th Street and south of NE 50th Court. This project includes drainage improvement, water main replacement, sewer force main replacement, rehabilitation of Lift Station B-2, Lift Station #3, Lift Station #4, sidewalk installation, roadway improvements and resurfacing. Cost $9,640,779.41 2015 2015 Expanded lloyd Estates Residential and industrial improvements Oakland Park, Florida Project Administrator/Senior Inspector. Project includes drainage improvements, water main replacement, installation of flood gates, stormwater pump station and a tidal check valve. The drainage improvements include construction of roadside swales, construction of new stormwater conveyance system piping networks and exfiltration trenches, modification of existing conveyance systems and construction of a new out fall structures. Cost $7,832,907.90 2015 2016 87 c. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete One Section E for Each Key Person.) 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE 19. RELEVANT PROJECTS a. b. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 Felix GARciA FELIX GARCIA, PE calvin, Giordano & Associates, inc. B.S. in civil engineering Professional engineer Florida Fort Lauderdale, FL University of Florida, Tallahassee, FL No. 72293 TIN#G62024180 CTQP: Asphalt Paving Level 1 & 2; Concrete Field Tech Level 1; Drilled Shaft; Earthwork Level 1 & 2; Final Estimates 1 & 2; Pile Driving; QC Manager; ACI Level 1; Advanced MOT; FDOT LAP Checklist Training; Nuclear Gauge Safety Training; OSHA 10; IMSA Traffic Signal Inspector Level 1; Stormwater, Erosion and Sedimentation Control ASSISTANT PROJECT ADMINISTRATOR 14 4 Downtown Mobility Hub Streetscape improvements Fort Lauderdale, Florida Project Administrator. This project is located in an area of downtown Fort Lauderdale bound by Andrews Avenue, Broward Boulevard, FEC tracks and NW 4th Street. This multi-modal hub will include, but is not limited to, asphalt paving, decorative concrete, bike lanes, drainage installation, curb and gutter, lighting, tree relocations, landscaping and irrigation installation, pavement striping and crosswalk improvements. Cost $2,359,635.57 2019 2020 Victoria Park Phase A & Phase B Watermain improvements Fort Lauderdale, Florida Victoria Park Phase A (Project No. 10850) & Victoria Park Phase B (Project No. 11901) Assistant Project Administrator. Elements include; installing approximately 60,000 feet of 6-inch and 8-inch watermain to replace existing 2-inch mains, including new fire hydrants, service connections to each home, & repaving of the roads impacted by the watermain improvements. Also includes all restoration to landscaping, lawns, pavers, etc. that may have been disturbed due to the work. Cost $11 Million. 2019 2019 Beachwalk ii Phase ii from 3rd Street to 5th Street (lAP Funded) Miami Beach, Florida Project Administrator. This project consisted of construction of an ongrade ADA compliant pedestrian paver walkway, with bollard lights, landscaping and irrigation. Other work consists of exotic dune vegetation removal and replacement with dune enhancements such as native dune vegetation species and beach compatible dune fill and irrigation for the landscaping. The path lighting installation meets Florida Fish & Wildlife Commission’s marine turtle nesting requirements. 2017 2018 88 h. 19. RELEVANT PROJECTS (CONT.) f. e. d. g. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 Felix GARciA Middle Beach Recretational corridor - Phase iii Miami Beach, Florida Project Administrator. This project consisted of construction of an ongrade ADA compliant pedestrian paver walkway, with bollard lights, landscaping and irrigation. Other work consists of exotic dune vegetation removal and replacement with dune enhancements such as native dune vegetation species and beach compatible dune fill and irrigation for the landscaping. The path lighting installation meets Florida Fish & Wildlife Commission’s marine turtle nesting requirements. 2015 Ongoing Middle Beach Recretational corridor - Phase ii Miami Beach, Florida Project Administrator. This project consisted of construction of an ongrade ADA compliant pedestrian paver walkway, with bollard lights, landscaping and irrigation. Other work consists of exotic dune vegetation removal and replacement with dune enhancements such as native dune vegetation species and beach compatible dune fill and irrigation for the landscaping. The path lighting installation meets Florida Fish & Wildlife Commission’s marine turtle nesting requirements. 2011 2019 MlK (Hammondville Road) improvements (from Powerline Road to Turnpike) Pompano Beach, Florida Project FM #432861-1-58-01 Project Administrator. Improvements include roadway widening, sidewalk installation, drainage improvements, milling and resurfacing, lighting, median installation, signage, landscaping, irrigation and pavement markings. Cost: $3,554,121.43 2015 2016 School Zone Pedestrian Safety Program Various Locations (Broward County), Florida LAP Funded $2.4 M; FHWA; FM #4328661 Project Administrator. Roadway improvements, including pavement, pedestrian facilities, drainage, water and sewer, lighting, etc., overhead school zone flashers conversions to structural mast arms, including solar power conversions and relocation of school zone infrastructure to match modified school zone limits, conversion of non-flashing school signs to flflashing signs, including solar power installation, pedestrian/bicycle/transit connector linkages, traffic, etc. Cost $2.4 M 2017 2017 89 c. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete One Section E for Each Key Person.) 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE 19. RELEVANT PROJECTS a. b. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 BeRNNON ARTOlA BERNNON ARTOLA Calvin, Giordano & Associates, Inc. High School Diploma Fort Lauderdale, FL Miami Coral Park High School TIN#A634068772910 CTQP: Asphalt 1 & 2; Concrete Field Tech 1; Drilled Shaft, Earthwork 1 & 2; Final Estimates 1 & 2; QC Manager; Advanced MOT; ACI 1 & 2; IMSA Traffic Signal 1; LIMS Training; MSE Wall Inspector; OSHA 10 Construction Training, Stormwater, Erosion and Sedimentation Control PROJECT ADMINISTRATOR 15 2 expanded lloyd estates Residential and Industrial Improvements Oakland Park, Florida Senior Project Engineer / Contract Administration. Project includes drainage improvements, water main replacement, installation of flood gates, stormwater pump station and a tidal check valve. The drainage improvements include construction of roadside swales, construction of new stormwater conveyance system piping networks and exfiltration trenches, modification of existing conveyance systems and construction of a new out fall structures. Cost $7,832,907.90 2015 2016 MlK (Hammondville Rd) Improvements (from Powerline Rd to Turnpike) Pompano Beach, Florida Senior Project Engineer / Contract Administration. Improvements include roadway widening, sidewalk installation, drainage improvements, milling and resurfacing, lighting, median installation, signage, landscaping, irrigation and pavement markings. Cost: $3,554,121.430 2016 2017 D/B SR 9A/I-95 (from NW 29 St to NW 131 St) Project FM #429300-3-62-01 FDOT District 6, Florida Project Administrator. This project will reconstruct 3.041 miles of SR-9A/I-95 mainline pavement, shoulder pavement, on and off ramp improvements, & drainage infrastructure improvements including trench drains to resolve spread related issues. In addition, the project includes the construction of Express Lanes Emergency Stopping Sites in the median at 5 locations between NW 62nd St (MP 6.213) and NW 131st St. (MP 10.511). Cost: $89,490,000.00 2016 Ongoing 90 h. 19. RELEVANT PROJECTS (CONT.) f. e. d. g. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 BeRNNON ARTOlA Department of environmental Protection; Kemp Channel Span Replacement Florida Project FM#418396-1, FDEP Project #FS050 Senior Project Engineer / Contract Administration. Construction of the Kemp Channel Bridge Span replacement and retrofitting, located at approximately Mile Marker 23.5. This project is to be a portion of the Florida Keys Overseas Heritage Trail State Park as described in the approved Trail Master Plan dated August 2000. Cost $1,868,000.00 2015 2016 Bid Pack 9 Infrastructure Improvements Oakland Park, Florida Senior Project Engineer / Contract Admin. The project encompasses approximately 570 acres, the project boundaries are east of Dixie Highway, west of Federal Highway, north of NE 38th Street and south of NE 50th Court. This project includes drainage improvement, water main replacement, sewer force main replacement, rehabilitation of Lift Station B-2, Lift Station #3, Lift Station #4, sidewalk installation, roadway improvements and resurfacing. Cost $9,640,779.41 2015 2016 91 c. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete One Section E for Each Key Person.) 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE 19. RELEVANT PROJECTS a. b. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 ERiN SuDMAN ERIN SUDMAN Calvin, Giordano & Associates, inc. Bachelor of Landscape Architecture Landscape inspectors Association of Florida Certificate Fort Lauderdale, FL University of Florida, Gainesville, Florida No. 2018-0215 TIN#S355213817850 CTQP: Final Estimates Level 1; Final Estimates Level 2; OSHA 10 Hr Construction Training Course; Security Awareness Course; Stormwater, Erosion and Sedimentation Control; FDOT LAP Checklist Training; Intermediate MOT; LIAF Landscape Inspector PIO/LANDSCAPE INSPECTOR 13 10+ SW 36th Avenue Sidewalk Project (W McNab Rd to W Palm Aire Dr) Pompano Beach, Florida Project FM # 431715-1-58-01 Resident Compliance Specialist/CSS. The project scope included the installation of a sidewalk along the west side of SW 36th Avenue commencing on the south end of Canal “A” north to Palm Aire Drive, a pedestrian lashing beacon crosswalk at the intersection of SW 36th Avenue and Gateway Drive, storm drainage construction, demolition, utility work, and permanent signage & striping. Cost $ 689,618.00 2016 2017 NW 110th Avenue Road improvements; Project FM #435088-1-58-01 (LAP Funded) Pompano Beach, Florida RCS/CSS/Landscape Inspector.Project elements included narrowing existing 12-ft travel lanes to 11 ft and constructing a 6-ft wide sidewalk, a 4-ft bicycle lane, drainage structure installation and curbing, valley gutter was removed and restored. Roadway was milled and resurfaced, landscaping, sidewalk and irrigation lines repaired. All improvements were constructed within City of Coral Springs right of way (ROW). Cost $1,599,491.63 2017 2018 Hard Rock Stadium Pedestrian Bridges and Tunnels Miami Gardens, Florida Project FM #’s 440858-1-58-01/440858-2-54-01 RCS/CSS/Landscape Inspector.2 pedestrian bridges over TPK exit ramp & NW 199 St,2 tunnels under Don Shula Dr. Included: pile foundations, MSE walls, drainage improvements, lighting, signalization improvements, signage & pavement markings, precast concrete, curb & gutter, ADA sidewalk/ramps,landscaping,sod,irrigation,parking lot resurfacing, striping, and signing. plus pre-stressed, pre-cast concrete tunnel segments, sheet piles. Super Bowl 2020. Cost $17 Million. 2019 2019 92 h. 19. RELEVANT PROJECTS (CONT.) f. e. d. g. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 ERiN SuDMAN NE 34th Court improvements (between NE 2nd Ave and 11th Ave) Oakland Park, Florida Project FM#Project FM # 429653-1-58-0 Inspector Aide/Landscape Inspector. This project included subsoil, demucking, earthwork, installation of storm drains, structures and water mains. Infrastructure improvements both in public right-of-way and private property, included landscaping, driveway reconstruction, milling and resurfacing, signing and marking, sidewalk installation, fences and other misc. items.Cost $2,890,356.00 2014 2015 MLK (Hammondville Road) improvements Pompano Beach, Florida Landscape Inspector/CSS. Improvements included roadway widening, sidewalk installation, drainage improvements, milling and resurfacing, lighting, median installation, signage, landscaping, irrigation and pavement markings. Cost: $3,554,121.43 2016 2016 93 c. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete One Section E for Each Key Person.) 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE 19. RELEVANT PROJECTS a. b. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 ReyNAlDO AlFONSO REYNALDO ALFONSO Calvin, Giordano & Associates, Inc. High School Diploma Fort Lauderdale, FL Antonio Guiteras High School, Cuba TIN#A415720623389 CTQP: Asphalt Paving Level 1; Asphalt Paving Level 2; Concrete Field Tech Level 1; Concrete Field Tech Level 2; Drill Shaft; Earthwork 1; Earthwork 2; Final Estimates 1; Pile Driving; Advanced MOT; IMSA Traffic Signal Tech Level 1; IMSA Traffic Signal Inspector Level 1; OSHA 10hr; Stormwater, Erosion and Sedimentation Control; SENIOR INSPECTOR 18 5 Broward County School Zone Pedestrian Safety Program (Various locations) Broward County, Florida LAP Funded $2.4 M; FHWA; FM # 4328661 Senior Inspector. Roadway improvements, including pavement, pedestrian facilities, drainage, water and sewer, lighting, etc., overhead school zone flashers conversions to structural mast arms, including solar power conversions and relocation of school zone infrastructure to match modified school zone limits, conversion of non-flashing school signs to flashing signs, including solar power installation, pedestrian/bicycle/transit connector linkages, traffic, etc. Cost $2.4 Million 2017 2017 D/B SR 9A/I-95 (from NW 29 St to NW 131 St) Project FM # 429300-3-62-01 FDOT District 6, Florida Senior Inspector. Reconstruct 3.041 miles of SR-9A/I-95 mainline pavement, shoulder pavement, on and off ramp improvements, & drainage infrastructure improvements including trench drains to resolve spread related issues. In addition, the project includes the construction of Express Lanes Emergency Stopping Sites in the median at 5 locations between NW 62nd St (MP 6.213) and NW 131st St. (MP 10.511). Cost $89 Million 2018 2018 Hard Rock Stadium Pedestrian Bridges and Tunnels Miami Gardens, Florida Project FM #’s 440858-1-58-01/440858-2-54-01 Senior Inspector.2 pedestrian bridges over TPK exit ramp & NW 199 St,2 tunnels under Don Shula Dr. Included: pile foundations, MSE walls, drainage improvements, lighting, future signalization improvements, signage& pavement markings, precast concrete, curb & gutter, ADA sidewalk/ramps,landscaping,sod,irrigation, parking lot resurfacing, striping, and signing. plus pre-stressed, pre-cast concrete tunnel segments, sheet piles. Super Bowl 2019. Cost $ 17 Million 2019 2019 94 h. 19. RELEVANT PROJECTS (CONT.) f. e. d. g. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 ReyNAlDO AlFONSO (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firm I-595 express Corridor Improvement P3 Project FDOT District 4, Florida Senior Inspector. The project extended from the I75/Sawgrass Expressway interchange to the I595/I95 interchange. The corridor improvements consisted of tolled, reversible, ground-level express lanes within the median of I595, safety modifications to the I595/ Florida Turnpike interchange,continuous connection of SR 84 between Davie Road and SR 7/ US 441, auxiliary lanes on I595 with combined ramps, cross-road bypasses and grade-separated entrances. Cost $1.25B 2011 2011 I-95 Rehabilitation Project (N & S Bound) Pavement Rehab FDOT District 6, Florida I-95 Rehabilitation Project (N & S bound) Pavement Rehab (from NW62 St to Golden Glades; FM # 430790-1/2-52-01 Senior Inspector. Project consisted of remove and replace crack- concrete-slabs (14k cy) gridding, saw-seal, (On/offramps) milling and asphalt resurfacing, curb and gutter, ADA ramps; lighting, MOT, marking, placed loops, Signalization, striping and landscaping. 2014 2014 95 c. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete One Section E for Each Key Person.) 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE 19. RELEVANT PROJECTS a. b. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 LANce RObiNSON LANCE ROBINSON calvin, Giordano & Associates, inc. McFatter Technical center Fort Lauderdale, FL Florida TIN# R152521853710 CTQP: Asphalt Paving Level 1; Asphalt Paving Level 2; Concrete Field Tech Level 1; Drilled Shaft; Earthwork Level 1; Earthwork Level 2; Final Estimates Level 1; Pile Driving Other: Advanced MOT; ACI Level 1 (Concrete Field); ACI Level 2 (Transportation) (Scheduled); Commercial Vehicle License; IMSA Traffic Signal Inspector Level 1; OSHA 10 Hour Construction Training Course; Nuclear Gauge Safety Training; Stormwater, Erosion and Sedimentation Control SENIOR INSPECTOR 13 3 Miami-Dade expressway Authority; (Gec-b) 83608 GiS confirmation ($1 Million) Miami-Dade County, Florida Senior Inspector. Mr. Robinson was performing GIS confirmation and final inspection of all roadway assets to be transferred to MDX. Assets included are Lighting, Bridges, Sign Structures, ITS Components, DMS and ADMS systems, Roadway Limits, Fences (gates), Lanscaping and Mowing Limits. Task involves the asset identification, location and GPS reading to then be transfer to final data base. All assets must be tag and photograph for future retrieval. 2016 - 2017 2017 D/b SR 9A/i-95 (from NW 29 St to NW 131 St) Project FM# 429300-3-62-01 FDOT District 6, Florida (Project cost $89,490,000): Senior Inspector. The Improvements under this Design-Build Contract consist of the replacement / reconstruction of all concrete and/or Rigid pavement surface on SR-9/I-95 from north of NW 29th Street (M.P. 4.253) to north of NW 79th Street (M.P 7.294) in Miami-Dade County. The project will reconstruct 3.041 miles of SR-9A/I-95 mainline pavement, shoulder pavement, on and off ramp improvements, & drainage infrastructure improvements including trench drains to resolve spread related issues. In addition, the project includes the construction of Express Lanes Emergency Stopping Sites in the median at 5 locations between NW 62nd St (MP 6.213) and NW 131st St. (MP 10.511). 07/2017 - 2018 2018 campbell Drive Grouping FDOT District 6, Florida Project FM #405575-6-52-01, 405575-7-52-01, 405575-8-52-01 (Project cost $16,353,016.96) Senior Inspector. The Improvements under this Construction Contract consist of reconstruction of SR 998 (Campbell Drive) and SW 336 St (Davis Parkway) and milling and resurfacing along SR 9336 (Palm Dr.) from west of Krome Avenue to east of US-1, drainage improvements, highway lighting, and reconstruction of 8 signalized intersections. The project will create a bypass from Krome to US-1 and remove truck traffic from the Homestead Historic Downtown District. 03/2020-Ongoing 96 h. 19. RELEVANT PROJECTS (CONT.) f. e. d. g. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 LANce RObiNSON SR 826/SR 836 interchange D/b Finance ($595 Million) FDOT District 6, Florida Project included the design & construction of 46 bridges with over 4 million cubic yards of embankment. The 46 bridges consist of 32 FL I-Beam Category 1 bridges & 14 FL I-Beam & Steel Category 2 bridges (including 4 segmental bridges). The project’s scope include 6.8 million tons of dirt removal (approx. 300,000 dump truck loads), 30 miles of concrete pile length, 16 miles of drainage pipe, 8,636 tons of reinforcing steel, 180,000 tons of asphalt, 16 miles of bridge beams, 760,000 SF of retaining wall, 35,000 linear ft of guardrail, & 5.7 miles of concrete wall separating traffic lanes. Mr. Robinson served as Roadway/Bridge Inspector & was promoted to Senior Inspector. His responsibility included jack & bore recording, (LIMS) entry, embankment verification, MSE wall construction, monitoring MOT devices, general roadway construction & casting yard inspection. One of the primary responsibilities for Mr. Robinson was the inspection for cofferdam construction & dewatering operations. This was used for the bridge foundation limits & the embankment limits. 2009-2016 2016 US 27 (SR 25) from Palm beach county Line & broward county to SR-80 FDOT District 4 Inspector. This project involved selective clearing and grubbing, guardrail, drainage, landscaping, and asphalt. Mr. Robinson assisted inspectors with daily record keeping, laboratory information management system entry and general roadway construction inspection. Cost: $158 Million 2009 2009 Miami-Dade expressway Authority; Killian Parkway/SW 104th St Miami-Dade County, Florida Killian Parkway/SW 104th Street (from SW 112th to 108th Ave. – MDX 87404 4th Lane)($1Million): Senior Inspector. Duties included; running estimates, verifying inspections and coordinating multiple areas for material testing and inspections. Project consists of widening of Killian Parkway to add a fourth lane in the westbound direction. The fourth lane will allow an exclusive right turn into Miami-Dade College. Project consisted on a selective clearing and grubbing, curb and gutter, concrete separator, guardrail installation on the 87404 SB ramp, widening, complex signalization work, milling and resurfacing. In addition, extensive coordination with a DMS system wide project was required to avoid field conflicts between contractors. Both projects were on-going simultaneously. In addition, project included a major signalization improvement with multiple pedestrian crossings. Miami Dade County Signals Division provided a record acceptance. 2015-2016 2016 97 c. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete One Section E for Each Key Person.) 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE 19. RELEVANT PROJECTS a. b. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 GARy CRAiG GARY CRAIG Calvin, Giordano & Associates, inc. High School Diploma Fort Lauderdale, FL A. Crawford Mosley High School TIN#C620299573690 CTQP: Asphalt Paving Level 1; Asphalt Paving Level 2; Concrete Field Tech Level 1; Concrete Field Tech Level 2; Drill Shaft; Earthwork 1 & 2; Final Estimates 1 & 2; Pile Driving; QC Manager; Qualified Grouting Tech Level 1 & 2; Qualified Post Tensioning Tech Level 1 & 2; ACI Level 1 & 2; Advanced MOT SR INSPECTOR/SR BRIDGE INSPECTOR 42 10+ SR A1A Bridge No. 860011 Over Hillsboro inlet; FDOT District 4, Florida Project FM # 425935-1-52-01/425935-1-52-02 Senior Inspector. Improvements include rehabilitation of existing span drive machinery including but not limited to drive motors, secondary reducer and new span locks replacement, Bridge pier structural retrofit to accommodate a new (2) two story Tender House building, replace east sidewalk with upgraded configuration, including new steel traffic rails and pedestrian rails from beginning of south approach to end of north approach. Cost $7,765,531.75 2016 2017 North Bay Road Emergency Access Bridge & Seawall Mitigation Sunny Isles Beach, Florida Senior Bridge Inspector. Bridge was necessary as an alternate route for emergencies because north-south access is limited to Collins Avenue, the bridge will be open to pedestrians and will provide an alternate evacuation route during hurricane and tropical storm events. The bridge measures 263 feet by 39 feet wide with eight (8) feet over-water clearance for navigational access. 2016 2016 D/B SR 9A/i-95 (from NW 29 St to NW 131 St) Project FM #429300-3-62-01 FDOT District 6, Florida Senior Inspector. Reconstruct 3.041 miles of SR-9A/I-95 mainline pavement, shoulder pavement, on and off ramp improvements, & drainage infrastructure improvements including trench drains to resolve spread related issues. In addition, the project includes the construction of Express Lanes Emergency Stopping Sites in the median at 5 locations between NW 62nd St (MP 6.213) and NW 131st St. (MP 10.511). Cost $89 Million 2017 2017 98 h. 19. RELEVANT PROJECTS (CONT.) f. e. d. g. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 GARy CRAiG NW 38th St from Powerline Rd to Andrews Ave Oakland Park, Florida Project FM # 427766-1-58/68-01 Fed # 8886054A Senior Inspector. Project included above ground improvements, widening, drainage improvements, signing and pavement markings, milling and resurfacing, installation of landscaping, irrigation, sidewalks and decorative lighting. Cost $659,996.81 2013 2013 Clematis Street improvements; LAP Project FM #427652--58-02 West Palm Beach, Florida Senior Inspector. The Okeechobee Blvd project included the installation of landscaping and irrigation improvements within the project area. Cost $373,725.51 2014 2014 99 c. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete One Section E for Each Key Person.) 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE 19. RELEVANT PROJECTS a. b. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 JuliO ANTONiO JULIO ANTONIO Calvin, Giordano & Associates, inc. Associate in Construction Management General Contractors license Florida Certified Home inspector license Florida Fort Lauderdale, FL Miami-Dade College, Miami, Florida No. 048458 No. HI4031 TIN#A535421571320 CTQP: Asphalt Paving Level 1 & Level 2; Concrete Field Tech Level 1; Drill Shaft; Earthwork Level 1 & Level 2; Final Estimates Level 1 & Level 2; Pile Driving; Qualified Grouting Tech; ACI Concrete Field Testing 1; Critical Structures; Intermediate MOT; IMSA Traffic Signal Level 1; Nuclear Gauge Safety Training; Stormwater, Erosion & Sed SENIOR INSPECTOR 35 9 North Bay Road Emergency Access Bridge & Seawall Mitigation Sunny Isles Beach, Florida Senior Bridge Inspector. Bridge was necessary as an alternate route for emergencies because north-south access is limited to Collins Avenue, the bridge will be open to pedestrians and will provide an alternate evacuation route during hurricane and tropical storm events. The bridge measures 263 feet by 39 feet wide with eight (8) feet over-water clearance for navigational access. 2017 2017 Beachwalk ii Phase ii (from 3rd St to 5th St) (lAP Funded) Miami Beach, Florida Senior Inspector. This project consisted of the construction of an ongrade ADA compliant pedestrian paver walkway, with bollard lights, landscaping & irrigation. Other work consisted of exotic dune vegetation removal, replaced with dune enhancements such as native dune vegetation species & beach compatible dune fill & irrigation for the landscaping. The path lighting also meets Florida Fish and Wildlife Commission’s marine turtle nesting requirements. Cost$1,629,456.40 2017 2018 Hard Rock Stadium Pedestrian Bridges and Tunnels Miami Gardens, Florida Project FM #’s 440858-1-58-01/440858-2-54-01 Senior Inspector. Project consists of the construction of a pedestrian bridge over the Turnpike exit ramp and a pedestrian bridge over NW 199 Street and two concrete tunnels under Don Shula Drive. Includes; pile foundations,MSE walls, drainage, lighting, signalization, signage & pavement markings, precast concrete, curb & gutter, ADA sidewalk/ramps, landscaping, sod, irrigation, parking lot resurfacing, barrier walls & electrical. Completed prior to 2019 Superbowl. 2019 2019 100 h. 19. RELEVANT PROJECTS (CONT.) f. e. d. g. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 JuliO ANTONiO Bid Pack 9 infrastructure improvements Oakland Park, Florida Senior Inspector. Approx 570 acres, included drainage improvements, water main replacement, sewer forcemain replacement, rehabilitation of Lift Station B-2, 3 & 4, sidewalk installation, roadway improvements & resurfacing. Drainage improvements included swales, underdrains, stormwater conveyance system piping networks and exfiltration trenches. Cost $9,640,779.41 2015 2015 Expanded lloyd Estates Residential and industrial improvements Oakland Park, Florida Senior Inspector. Project included drainage improvements, watermain replacement, installation of flood gates, stormwater pump station and a tidal check valve. The proposed drainage improvements include construction of roadside swales, construction of new stormwater conveyance system, piping networks and exfiltration trenches, modification of the existing conveyance systems & construction of new outfall structures that discharge into the Sleepy River. Cost $7,832,907.90 2015 2016 101 c. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete One Section E for Each Key Person.) 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE 19. RELEVANT PROJECTS a. b. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 VicTOR MuRphy (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firm VICTOR MURPHY calvin, Giordano & Associates, inc. instituto Superior de ciencias Medicas de Villa clara Fort Lauderdale, FL Cuba TIN# M612873670100 CTQP: Asphalt Paving Level 1; Concrete Field Tech Level 1; Earthwork Level 1; Earthwork Level 2; Final Estimates Level 1 Other: ACI Level 1 (Concrete Field); FDOT ITS Managed Field Ethernet Switch Training; FDOT ITS Road Weather Information System Training; FDOT ITS Microwave Vehicle Detection System Training; FDOT ITS Closed-Caption Television Training; FDOT ITS Dynamic Message Signs Training; Hazmat; Nuclear Gauge Safety Training; Intermediate MOT; MSE Wall & Auger Cast Piles; Security Awareness Course; Stormwater, Erosion and Sedimentation Control INSPECTOR 4 1 MDX; D/B SR-836 Operation, capacity and interchange improvements Florida Proj No. 83628.050 (Cost $149 M): Proj elements include: the addition of EB/WB lanes to SR-836 from W of 57th Ave to E of 17th Ave, implementation of C-D Rds to the major interchanges at 57th Ave, 42nd Ave (LeJeune Rd), 37th Ave (Douglas Rd), 27th Ave, & 17th Ave, & replacement of the ITS Backbone, as well as the ORT facilities in the system. Improved the level of service & safety features, provided additional capacity on the SR-836 mainline & operational movements in & around the existing interchanges. Responsible for performing MOT verification checks, measurements, calculating quantities, material sampling, performing densities, erosion control checks, checking cross slope depth & width, & assisting Sr Insp. while testing for concrete, roadway drainage, highway lighting, fencing, & guardrails, as well as maintaining accurate Proj records. Responsible for inspections of electronic tolling, DMS, installation of fiber optic trunk for the project, installation of CCTV poles with cabinets, installation of lighting, signalization, pull boxes, & power service. 2017-2019 2019 i-95 Express; phase 3A; project FM # 433108-4-52-01 Florida Inspector. This phase will extend the existing express lanes north from just south of Broward Boulevard to just north of Commercial Boulevard in Broward County. One lane will be added and the High Occupancy Vehicle (HOV) lane will be converted to create two express lanes in each direction. This project includes ramp signalization from Hallandale Beach Boulevard to Commercial Boulevard. Other work includes: installing Intelligent Transportation System (ITS) and tolling equipment; widening bridges; and installing noise barrier walls at locations along I95 Southbound between Broward Boulevard and NW 6th Street, and along I-95 Northbound between Powerline Road and Commercial Boulevard. Victor was responsible for densities for MSE walls, embankment, ITS improvements inspections, subgrade, base; concrete testing, barrier wall, MSE wall placement, drainage, MOT reviews. Cost: $149 Million 2020 2020 Florida’s Turnpike Enterprise, South Florida DMS improvement and Replacement Florida Project FM # 435605-7-52-01: Inspector. Project consists of the construction of new ADMS structures and demolition of existing units along the approach streets to Sawgrass Expressway, Homestead exits at 288 Street and 137 Avenue, and Lake Worth Road. New CCTV poles will be installed with ITS cabinets with transfer switch and generator pads. The project also consists of fiber installation using open trench and directional bore, splicing new power services, and replacement of Large walk-in DMS units over the Turnpike mainline. 2020-Ongoing 102 h. 19. RELEVANT PROJECTS (CONT.) f. e. d. g. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 VicTOR MuRphy (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firm MD pS h-irma post-Event Natural Disaster Monitoring Florida Inspector. Debris Tower Monitor Member of the emergency repairs team after natural disaster-related emergency. Supervised several teams in-charge of debris removal, protected remaining facilities, restored essential traffic, including proper Maintenance of Traffic (MOT), from Federal Aid Highway segments, state, local, and private roadways within the Florida Department of Transportation (FDOT). 2017 - 2018 103 c. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete One Section E for Each Key Person.) 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE 19. RELEVANT PROJECTS a. b. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 RezA ShAMS (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firm (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firm REZA SHAMS Calvin, Giordano & Associates, Inc. Bachelor of Science in Civil engineering Fort Lauderdale, FL University of Miami, Miami, Florida TIN#S520001524640 CTQP: Asphalt Level 1 & Level 2; Concrete Field Tech Level 1 & Level 2; Drilled Shaft; Earthwork Level 1 & Level 2; Final Estimates Level 1 & Level 2; QC Manager; Advanced MOT; ACI Level 1 & Level 2; Critical Structures; IMSA Traffic Signal Inspector Level 1; Nuclear Gauge Safety Training; Stormwater, Erosion and Sedimentation Control ASSISTANT PA/CSS 36 1+ SFWMD; Section C Water Farm Berm Construction for C-23 Florida CSS. The section C water farm berm construction project consisted of the construction of a small impoundment for C-23 canal that located St. Lucie County. The farm was constructed over approximately one square mile of land and included; clearing & grubbing and construction of embankment, canal vehicle access ramps, vehicle turnouts maintenance berm, seepage canal, culvert, exfiltration trench, water control structure & pipes, stilling basin, armoring, & sod. 2016 2016 Port of Miami Terminal A Berth-7 Miami, Florida This project consisted of construction of a Bulkhead concrete cap (Seawall), including massive foundation of pipe pile, sheet pile (Combi-wall) supported with tie rods, grout soil anchors, water station, bollards and drill shafts. Also included construction of PBB (Passenger Boarding Bridge) with augercast piles as foundation and construction of apron, retaining walls, drainage system, water supply with lighting system and asphalt. 2017 2018 Collins Avenue (SR A1A) Decorative Lighting (from Bayview Dr to 192nd St) Sunny Isles Beach, Florida Project includes the removal of existing conventional lighting poles, installation of new pole foundations or rehabilitation of existing pole foundations, installation of new decorative poles, installation of electrical conduits and wires and MOT supervision. Cost: $4,830,000.00 2018 2019 104 h. 19. RELEVANT PROJECTS (CONT.) f. e. d. g. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 RezA ShAMS (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firm Car Rental and CS east Concourse Miami Intermodal Center Oakland Park, Florida Project FM # 249937-5-52-01 & 406800-2-52-03 CSS. This project spanned 10 years and consisted of 3 million sq ft of floor space with a terminal quality customer service lobby, multi- floor refueling system, associated ramp structures tying into a rental car center including a CC2 bridge with curved steel superstructure on driven piles, MSE walls, rigid pavement for bus station parking areas, lighting & signalization. Cost $600 Million 2006 2006 Miami-Dade Transit (MDT); earlington heights Connector Miami Intermodal Center Miami-Dade, Florida Structural Inspector. This gateway project included 2.5 miles of elevated bridges that combined segmental and U-Beams with all transit system facilities. Cost $500 Million 2009 2009 105 General Planning Redevelopment Srvcs Arch Visualizations & 3D Water / Wastewater Eng Electrical Engineering Environmental Srvcs Website Development GIS Mapping & Analysis Surveying and Mapping Urban Design Traffic Engineering Constr Admin / CEI Landscape Architecture Civil Engineering Public Outreach 20. EXAMPLE PROJECT KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETED 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE a. b. c. d. e. STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS In-house CGA services provided for this project: 2011 2018 01 CITY OF SUNNY ISLeS BeACH Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and all in-house services identified above. North Bay Road Pedestrian Bridge elka Linton-Dorsett 305.792.1939 Sunny Isles Beach, FL CIP Program Manager edorsett@sibfl.net APPROXIMATE PROJECT SIZE: PROFESSIONAL FEES: CONSTRUCTION COST: 0.7 Acres $ 1,050,000 $ 7,800,000 CGA was retained by the City of Sunny Isles Beach to survey, design, permit, and administer the construction of the North Bay Road Bridge, spanning a canal between 174th St. and 172nd St. along North Bay Road. The principal function of the bridge is to provide pedestrian access across the canal, as well as it is designed to provide access to emergency vehicles as a bypass to Collins Ave. during periods of heavy traffic congestion. The CGA team approached the project first as a ‘place’ and a pedestrian amenity, and second as an emergency access last. The design was centered on creating a park-like setting with planting and seating that would appeal to pedestrian use and would promote lingering. A strong branding strategy was embedded within the hardscape design that reinforced the concept of using infrastructure as a recreational asset and in turn has established it as a landmark within the City. The project included several work efforts adjacent to the bridge, including the construction of an observation deck in Town Center Park, located at the eastern end of the canal, and a boardwalk connecting the deck to the North Bay Road bridge. Associated drainage, roadway, utility, and hardscape improvements were made along 174th St. and 172nd St. to account for the increased drainage and other impacts to the surrounding infrastructure. The project involved intensive coordination with regulatory agencies, utilities, government entities, and local stakeholders. The CGA team was able to procure all necessary permits to conduct the work on schedule. X X X X 106 General Planning Redevelopment Srvcs Arch Visualizations & 3D Water / Wastewater Eng Electrical Engineering Environmental Srvcs Website Development GIS Mapping & Analysis Surveying and Mapping Urban Design Traffic Engineering Constr Admin / CEI Landscape Architecture Civil Engineering Public Outreach 20. EXAMPLE PROJECT KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETED 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE a. b. c. d. e. STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS In-house CGA services provided for this project: 2012-2014 2019 02 CITY OF MIAMI BeACH Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and all in-house services identified above. Middle Beach Recreational Corridor - Phase II Ariel Guitian 305.673.6071 ext. 6732 Miami Beach, FL Senior Project Coordinator, Office of Capital Improvements ArielGuitian@miamibeachfl.gov APPROXIMATE PROJECT SIZE: PROFESSIONAL FEES: CONSTRUCTION COST: 2 Miles $ 534,000 $ 13,000,000 Calvin, Giordano & Associates, Inc. designed and permitted an on-grade, ADA- accessible pathway that supports the use of pedestrians and cyclists. The project is a part of the greater Atlantic Greenway Network, and comprises a critical component of the bicycle facilities throughout the City of Miami Beach. It connects Indian Beach Park on the south to the North Beach Recreational Trail at Allison Park with a 2-mile paver walkway, continuing the City’s unique branding qualities. The path was permitted in accordance with the Florida Dept. of Environmental Protection’s and the Florida Fish and Wildlife Conservation Commission’s regulations, as the entirety of the project lies within State-owned lands. The scope of work included extensive public outreach, branding and site design, coastal engineering, dune planting plans, lighting design, and bidding and construction administration. The project connects business districts, cultural/tourism centers, parks, residential neighborhoods and the beaches, and it completed a major portion of the essential north-south connector of the AGN to facilitate pedestrian and non-motorized transportation throughout the City. X X X X X X 107 General Planning Redevelopment Srvcs Arch Visualizations & 3D Water / Wastewater Eng Electrical Engineering Environmental Srvcs Website Development GIS Mapping & Analysis Surveying and Mapping Urban Design Traffic Engineering Constr Admin / CEI Landscape Architecture Civil Engineering Public Outreach 20. EXAMPLE PROJECT KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETED 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE a. b. c. d. e. STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS In-house CGA services provided for this project: 2009 - Ongoing N/A 03 CITY OF HALLANDALe BeACH Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and all in-house services identified above. Hallandale Beach Ne Quad and SW Drainage Improvements Manga ebbe 954.597.3700 Hallandale Beach, FL Project Manager mebbe@hallandalebeachfl.gov APPROXIMATE PROJECT SIZE: PROFESSIONAL FEES: CONSTRUCTION COST: 170 Acres (NE) | 330 Acres (SW) $ 470,000.00 (NE) | $782,395.00 (SW) $ 8.3 M (NE) | $9.3 M (SW) The two Hallandale Beach Drainage Improvement Projects’ main goals were to defend the neighborhood from sea level rise and most importantly, reduce their dependence on discharge to a tidally controlled water body. The NE neighborhood project included the installation of two (2) large pump stations pumping stormwater into 15 drainage injection wells within the neighborhood. In-line check valves were installed just before the system’s two outfalls allowing discharge via gravity during low tide but stopping water from back-flowing into the neighborhood’s system during high tide. The pump station and drainage wells were designed to handle a 100 year storm event without reliance on the existing tidally controlled gravity outfall. The SW neighborhood project installed a large pump station and 22 drainage injection wells. A large control structure with four (4) flapgates and 1 mechanically controlled slide gate was constructed to isolate the system from the downstream tidal waters, when necessary. The mechanical gate closes prior to stormwater pump station operation while the four (4) flapgates continue to allow for gravity discharge during low tides so the system maximizes the ability to flow via gravity, when possible, while also being self-reliant with the drainage wells. A large generator was constructed for the pump station to allow for continuous operation even during power outages. The permanent generator, which is set above FEMA flood elevations, was wrapped with a nature design to help blend with the neighborhood. The pump station and control structures were finished with native plantings to blend with the surrounding neighborhood. X X X X X X 108 General Planning Redevelopment Srvcs Arch Visualizations & 3D Water / Wastewater Eng Electrical Engineering Environmental Srvcs Website Development GIS Mapping & Analysis Surveying and Mapping Urban Design Traffic Engineering Constr Admin / CEI Landscape Architecture Civil Engineering Public Outreach 20. EXAMPLE PROJECT KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETED 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE a. b. c. d. e. STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS In-house CGA services provided for this project: 2014 2014 04 MIAMI-DADe COUNTY Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and all in-house services identified above. Rickenbacker Causeway Bridge Rehabilitation Kathleen Woods-Richardson 305.372.6789 Miami-Dade County, FL Director Email: N/A APPROXIMATE PROJECT SIZE: PROFESSIONAL FEES: CONSTRUCTION COST: N/A Acres $ N/A $ N/A CGA was subcontracted by Hardesty and Hanover, the engineering firm on the design build team with Kiewit Construction. CGA’s scope included hydrographic and topographic survey, drainage design, lighting and signing and pavement markings for the rehabilitation of the Rickenbacker Causeway’s West Bridge and the rehabilitation and expansion of the Bear Cut Bridge. The Bear Cut bridge was widened to accommodate a multi-use path in both directions, separated from the travel lanes by a barrier wall; and 8’ bike lanes adjacent to traffic in both directions. Also included were both approaches to Bear Cut Bridge which required coordination with two of the County’s adjacent future projects. The Rickenbacker Causeway is highly utilized by cyclists, both road bikes and cruisers. As such, Miami Dade Traffic was very focused on accommodating all users and getting stakeholder feedback as part of the project. Numerous meetings and coordination efforts made permitting the signing and pavement markings for this project possible. As part of the rehabilitation of the Bear Cut bridge, the existing cross slope and bridge deck structure were modified impacting the existing drainage through Miami Dade County’s Regulatory & Economic Resources Department and South Florida Water Management District was accomplished through innovative design and extensive agency coordination since the receiving waters, Biscayne Bay, are Outstanding Florida Waters. Electrical coordination for the demolition and rehabilitation of the bridge deck were critical to maintaining safe travel ways during construction. CGA coordinated the bridge circuits during construction as well as providing new lighting for the widened bridge and new multi-use paths. X X 109 General Planning Redevelopment Srvcs Arch Visualizations & 3D Water / Wastewater Eng Electrical Engineering Environmental Srvcs Website Development GIS Mapping & Analysis Surveying and Mapping Urban Design Traffic Engineering Constr Admin / CEI Landscape Architecture Civil Engineering Public Outreach 20. EXAMPLE PROJECT KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETED 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE a. b. c. d. e. STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS In-house CGA services provided for this project: 2015 - 2017 2017 05 FDeP Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and all in-house services identified above. Dr. Von D. Mizell-eula johnson State Park Mrs. Theresa Carron 850.245.2721 Fort Lauderdale, FL Project Manager Theresa.Carron@dep.state.fl.us APPROXIMATE PROJECT SIZE: PROFESSIONAL FEES: CONSTRUCTION COST: N/A Acres $ 45,919.64 $ 406,529.06 Formerly known as John U. Lloyd Beach State Park - Beach Access Boardwalk and Ramp Repairs CGA was contracted by the Florida Department of Environmental Protection (FDEP) to replace the existing boardwalk deck to meet current ADA requirements. The project scope included surveying, civil, permitting, preparation of construction documents and technical specifications, and assistance to FDEP during the bid processes. Project improvements included the re-decking of the boardwalks at four (4) separate beach access locations which provide pedestrian access from the existing parking facilities to the beach. The improvements have been designed to meet the Americans with Disabilities (ADA) Act and the Florida Accessibility Code of 2012. Environmental considerations were considered during the design process and the protection of all existing vegetation was a critical component for FDEP in this project. These enhancements were designed and permitted simultaneously, and were completed with the continued coordination through both client and permit agencies. Due to the proximity of the existing beach shore line, an FDEP Coastal Construction Control Line (CCCL) Field Permit was obtained to ensure proper design and site construction to minimize impacts to the adjacent sensitive coastal vegetation. Because design of boardwalks limited ground disturbance of surrounding seaward lands, a South Florida Water Management District (SFWMD) Deminimus Exemption was obtained for water resources. Construction was completed in 2017. X X X X 110 General Planning Redevelopment Srvcs Arch Visualizations & 3D Water / Wastewater Eng Electrical Engineering Environmental Srvcs Website Development GIS Mapping & Analysis Surveying and Mapping Urban Design Traffic Engineering Constr Admin / CEI Landscape Architecture Civil Engineering Public Outreach 20. EXAMPLE PROJECT KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETED 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE a. b. c. d. e. STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS In-house CGA services provided for this project: 2015 - 2019 2019 06 CITY OF OAKLAND PARK Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and all in-house services identified above. Andrews Avenue Roadway Improvements Lori Douvris 954.630.4200 Oakland Park, FL Project Manager Lori.Douvris@oaklandparkfl.gov APPROXIMATE PROJECT SIZE: PROFESSIONAL FEES: CONSTRUCTION COST: N/A Acres $ 227,310.00 $ 2,000,000.00 The improvements to Andrews Avenue from Prospect Road south to Oakland Park Boulevard was funded by a Transportation Enhancement grant through the FDOT District 4, which required it to follow FDOT LAP submittal requirements. The scope of this project includes construction of a landscaped median, reconstruction of existing sidewalks to meet current ADA standards, adding bicycle lanes, and a mid- block crossing for pedestrians, turn lane analysis, milling and resurfacing, signing and pavement markings, pedestrian lighting and conventional roadway lighting modifications. Permitting is required through Broward County Environmental Protection and Growth Management Division (BCEPGMD), Broward County Highway Construction and Engineering Division (BCHCED), Broward County Traffic Engineering Division (BCTED), and the City of Oakland Park. X X X X X X X 111 General Planning Redevelopment Srvcs Arch Visualizations & 3D Water / Wastewater Eng Electrical Engineering Environmental Srvcs Website Development GIS Mapping & Analysis Surveying and Mapping Urban Design Traffic Engineering Constr Admin / CEI Landscape Architecture Civil Engineering Public Outreach 20. EXAMPLE PROJECT KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETED 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE a. b. c. d. e. STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS In-house CGA services provided for this project: 2013 - 2017 2017 07 DANIA eNTeRTAINMeNT CeNTeR, LLC Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and all in-house services identified above. Dania jai-Alai Onsite & Offsite Improvements joaquin Gerlero 954.600.8397 Dania Beach, FL CEO & Founder F3 Architecture APPROXIMATE PROJECT SIZE: PROFESSIONAL FEES: CONSTRUCTION COST: N/A Acres $ 766,000.00 $ 3,000,000.00 CGA provided site development services for the onsite and offsite improvements required to upgrade the existing Jai-alai facility to accommodate a casino. Design, permitting, construction oversight, and closeout for new offsite water mains, onsite service connections for water and sewer, site circulation, coordination of utilities, drainage connections, two new entrances to the property, a revamped valet drop-off area as well as offsite roadway improvements to the adjacent city owned Fronton Boulevard were part of the project. The improvements on Fronton Boulevard required the design of a completely new storm water collection system to accommodate the roadway widening as the existing system was either undersized or in bad condition. New street lighting, irrigation and landscaped medians were installed to complete the corridor’s upgrade. The demand of the upgraded facility and requirements of the developer’s agreement with the City required 1,570 LF of 8” and 1,270 LF of 12” water main upgrades to the City’s transmission mains, new fire hydrants both onsite and offsite, and multiple new service and irrigation connections for the project site. City, Health Department and FDOT permitting and certifications were required for the new water main installation and operation. The new 8” sanitary sewer lines required close coordination with the proposed water main, existing and proposed storm drain laterals, the fire lines, MEP connections and underground electrical, gas, and communications for the building. CGA provided surveying, planning, civil and electrical engineering, landscape architecture and construction oversight for the improvements required to upgrade the existing Jai-alai facility to accommodate a casino. X X X X X 112 General Planning Redevelopment Srvcs Arch Visualizations & 3D Water / Wastewater Eng Electrical Engineering Environmental Srvcs Website Development GIS Mapping & Analysis Surveying and Mapping Urban Design Traffic Engineering Constr Admin / CEI Landscape Architecture Civil Engineering Public Outreach 20. EXAMPLE PROJECT KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETED 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE a. b. c. d. e. STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS In-house CGA services provided for this project: 2015 - 2018 2018 08 CITY OF COCONUT CReeK Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and all in-house services identified above. Windmill Park expansion and Renovation Brian Rosen 954.545.6614 Coconut Creek, FL Project Manager BRosen@coconutcreek.net APPROXIMATE PROJECT SIZE: PROFESSIONAL FEES: CONSTRUCTION COST: N/A Acres $ 108,260.00 $ 2,400,000.00 Calvin, Giordano & Associates, Inc. (CGA), was selected as part of the design team under Synalovski, Romanik, Saye Architects (SRS) to enhance Windmill Park for the City of Coconut Creek. Enhancements included new concrete sidewalks with exercise stations throughout the site, restroom building, expanding the existing parking areas with two new parking lots, reconstruction and repositioning of the tennis courts, a small and large dark park which included dog wash stations and agility equipment, a new ADA-approved play apparatus, and site furnishings throughout the site. SRS provided Architectural services for the new Restroom Building, and site layout. CGA provided civil, landscape and construction services to provide landscape, grading, and drainage including exfiltration trench and retention areas, water and sewer improvements to the site. Pavement markings, utility coordination and permitting was also included in the civil scope. Professional Landscape services included tree inventory for the project, tree removal/ relocation permit to meet City requirements, and the proposed planting plan including city requested berms for privacy and enhanced planting and irrigation. Construction Observation and Administration Services included periodic construction field representative observation services for the construction of site utilities, parking lot and associated drainage system improvements, sidewalks and final site grading. Permitting was required through City of Coconut Creek and Broward County Surface Water Management. The project was completed in September 2018. X X X 113 General Planning Redevelopment Srvcs Arch Visualizations & 3D Water / Wastewater Eng Electrical Engineering Environmental Srvcs Website Development GIS Mapping & Analysis Surveying and Mapping Urban Design Traffic Engineering Constr Admin / CEI Landscape Architecture Civil Engineering Public Outreach 20. EXAMPLE PROJECT KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETED 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE a. b. c. d. e. STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS In-house CGA services provided for this project: 2012 - 2014 2014 09 CITY OF MIAMI GARDeNS Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and all in-house services identified above. Rolling Oaks Park - Pedestrian Trail Project jimmie Allen 305.622.8000 ext 2802 Miami Gardens, FL Senior Project Manager - Capital Improvements JAllen@miamigardens-fl.gov APPROXIMATE PROJECT SIZE: PROFESSIONAL FEES: CONSTRUCTION COST: N/A Acres $ 140,000.00 $ 670,000.00 Calvin, Giordano & Associates, Inc. was contracted by the City of Miami Gardens to design a pedestrian trail within Rolling Oaks Park and to provide a safe route through the surrounding neighborhood to connect the new trail in the park to an existing walking trail in the Dolphin Center Park located three quarters of mile away. The design for the trail included new outdoor fitness stations, seating areas, and LED site lighting. A study was conducted by CGA to determine the best route for the walkway through the neighborhood and what improvements would be needed. New crosswalks are being added along with a solar powered, on-demand pedestrian crossing signal where the trail leaves the park. A custom-designed way-finding signage program was developed for all of the trailhead signs, directional signs, and mile markers and funded by LAP funds. This afforded the City of Miami Gardens a unique opportunity for branding within the community. Besides determining the best route through the neighborhood, the CGA team had to carefully plan the route for the trail through the park so as to not disturb the hundreds of existing Live Oak trees on the site. Using GPS technology, the CGA team worked out the best route for the trail in the field, and then returned to the office to translate those points into the final alignment for the pathway. In addition, the existing drainage permit for the site had to be modified for the trail improvements. These new drainage facilities also had to be carefully planned to avoid removing any trees. CGA also provided construction administration services for the project, which was completed in November 2014. X X X X X 114 General Planning Redevelopment Srvcs Arch Visualizations & 3D Water / Wastewater Eng Electrical Engineering Environmental Srvcs Website Development GIS Mapping & Analysis Surveying and Mapping Urban Design Traffic Engineering Constr Admin / CEI Landscape Architecture Civil Engineering Public Outreach 20. EXAMPLE PROJECT KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETED 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE a. b. c. d. e. STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS In-house CGA services provided for this project: 2011 N/A 10 CITY OF DANIA BeACH Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and all in-house services identified above. Dania Cove Park Mark T. Felicetty 954.924.6800 ext. 3730 Dania Beach, FL Director, P&R Department mfelicetty@ci.dania-beach.fl.us APPROXIMATE PROJECT SIZE: PROFESSIONAL FEES: CONSTRUCTION COST: N/A Acres $ 103,000 $ 537,000 CGA developed a waterfront park design on an archeologically significant site in the City of Dania Beach; the site, which contains a scenic mangrove cove, is located along the Dania Cut-off canal. The park design features waterfront elements, including a fishing dock and platform, picnic pavilions and an exercise path for the park users. Native plantings were used to eliminate the park’s need for permanent irrigation, and plants were selected for their educational opportunities including highlighting the butterfly attracting varieties. The project scope included designing the site amenities to preserve and highlight the remnant Oak Hammock; designing a stabilization system for the shoreline embankment along with vegetating the shoreline (before and after pictures shown above); designing informational kiosks featuring the historic Native American midden and the site’s natural resources; and obtaining all required permits for the installation of the site features. A State and a County Grant were provided to assist in the project costs. The scope also included coordinating with the County and State on gaining approval for the site design, tracking all expenditures and processing and obtaining all grant funds for the City, and closing out the grants and permits. As a part of the park’s design for the Dania Cove Park, CGA created a series of informational panels and environmental graphics to be installed on-site. The purpose of the graphics was to provide an educational component to the park to teach park users about the archeological significance of the site. An opportunity was found to also include historical panels to celebrate the history of the City of Dania Beach, as well as to highlight design features of the park design – such as the butterfly attractor plants. X X X X X 115 General Planning Redevelopment Srvcs Arch Visualizations & 3D Water / Wastewater Eng Electrical Engineering Environmental Srvcs Website Development GIS Mapping & Analysis Surveying and Mapping Urban Design Traffic Engineering Constr Admin / CEI Landscape Architecture Civil Engineering Public Outreach 20. EXAMPLE PROJECT KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETED 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE a. b. c. d. e. STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS In-house CGA services provided for this project: Landscape Architecture 2014 N/A 11 MIAMI-DADe PARKS Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and all in-house services identified above. Oak Grove Park Improvements Fernando Marquez, RA, LeeD AP 305.755.7847 North Miami, FL Architecture Section Head - Capital Programs Division Email APPROXIMATE PROJECT SIZE: PROFESSIONAL FEES: CONSTRUCTION COST: N/A Acres $ 35,000.00 $ 1,200,000.00 Oak Grove Park located at 690 NE 159th Street in North Miami, is one of the most highly utilized parks in the area and is known for its majestic Oak Tree canopy. CGA provided professional services to develop two new tennis courts, expand the fitness trails and add pedestrian lighting. In order to locate the new courts several existing large Oak trees and Gumbo Limbo trees had to be relocated. The success of these relocations has been recognized throughout the Miami Dade Parks, Recreation and Open Spaces as a pioneering effort. CGA provided the paving, grading and drainage for the new tennis courts and new fitness path throughout the park as well as the drainage modifications to accommodate the improvements while working around existing trees, where feasible. A new water service for a drinking fountain and a hose bid for the new tennis courts was provided. CGA also prepared specifications, construction oversight and permitting for this specialized park project. X X X X X X 116 General Planning Redevelopment Srvcs Arch Visualizations & 3D Water / Wastewater Eng Electrical Engineering Environmental Srvcs Website Development GIS Mapping & Analysis Surveying and Mapping Urban Design Traffic Engineering Constr Admin / CEI Landscape Architecture Civil Engineering Public Outreach 20. EXAMPLE PROJECT KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETED 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE a. b. c. d. e. STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS In-house CGA services provided for this project: 2015 2017 12 CITY OF DeLRAY BeACH CRA Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and all in-house services identified above. Fire Station Commemorative Plaza jeff Costello 561.276.8640 Delray, FL Asst. CRA Director costelloj@ci.delray-beach.fl.us APPROXIMATE PROJECT SIZE: PROFESSIONAL FEES: CONSTRUCTION COST: 0.25 Acres $ 7,000 $ 800,000 The Delray Beach CRA’s 2002 Downtown Master Plan identified NW/SW 5th Avenue as the mid-point along Atlantic Avenue, between Interstate I-95 and the downtown core. The plan recommended the creation of twin public plazas on the northwest and southwest corners of the intersection to serve as a new neighborhood center and gathering place for the community as a whole. CGA designed the plaza on the Northwest corner which consists of landscape features and pedestrian amenities. The design also included colorful terrazzo and keystone pavers similar to the Libby Wesley Plaza (SW corner) of intersection, and includes four bronze emblems featuring fire rescue motifs. Green building elements such as permeable pavers and native vegetation were also incorporated into the project. The design allows for seamless integration into the Atlantic Avenue corridor while still honoring the unique civic identity of the Fire Rescue Headquarters. X X X X X 117 General Planning Redevelopment Srvcs Arch Visualizations & 3D Water / Wastewater Eng Electrical Engineering Environmental Srvcs Website Development GIS Mapping & Analysis Surveying and Mapping Urban Design Traffic Engineering Constr Admin / CEI Landscape Architecture Civil Engineering Public Outreach 20. EXAMPLE PROJECT KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETED 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE a. b. c. d. e. STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS In-house CGA services provided for this project: 2020 2020 13 FORT LAUDeRDALe DOWNTOWN DeVeLOPMeNT AUTHORITY (DDA) Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and all in-house services identified above. SW 2nd Avenue elizabeth Van Zandt 954.123.4567 Fort Lauderdale, FL Executive Vice-President Elizabeth@ddaftl.org APPROXIMATE PROJECT SIZE: PROFESSIONAL FEES: CONSTRUCTION COST: 0.5 Acres $ 81,195 $ 750,000 Our approach to this project was one inherently about urban design and space- creation. It was not simply a matter of beautification, but rather a process of embedding the environment with value to take advantage of inherent, flexible opportunities. We believe that these, in turn, will animate socialization, celebrate the culture of place, and provide for a multi-functional framework. We seek to capture the human experience, including mood, atmosphere, color, sound, tactility, pleasure and light that characterizes the ethos of ‘place’ that lives at this intersection of: • Culture – with the Broward Center for the Performing Arts, Museum of Discovery and Science, and the Esplanade Park, • Socialization – with the vibrant Himmarshee Street nightlife scene, • History – with the campus of historical buildings, including the Museum of History, Hoch Heritage Center, Philemon Bryan House, King-Cromartie House, and the Schoolhouse), and • Access and Connectivity – with the continuity of the Riverwalk as a major destination linking the various waterfront properties. Our goal for this project was to provide a design solution that results in products that are resilient, innovative, creative, sensitive, inspiring, memorable, responsible, interpretive, comprehensive, imaginative and visionary. We lead by design and with design. X X X XX X 118 General Planning Redevelopment Srvcs Arch Visualizations & 3D Water / Wastewater Eng Electrical Engineering Environmental Srvcs Website Development GIS Mapping & Analysis Surveying and Mapping Urban Design Traffic Engineering Constr Admin / CEI Landscape Architecture Civil Engineering Public Outreach 20. EXAMPLE PROJECT KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETED 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE a. b. c. d. e. STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS In-house CGA services provided for this project: 2014 2018 14 CITY OF FORT LAUDeRDALe Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and all in-house services identified above. Mills Pond Park enrique Sanchez 954.123.4567 Fort Lauderdale, FL Assistant Parks & Recreation Director ESanchez@forlauderdale.gov APPROXIMATE PROJECT SIZE: PROFESSIONAL FEES: CONSTRUCTION COST: 7 Acres $ 461,560 $ 3,700,000 Calvin, Giordano & Associates, Inc. was selected by the City of Fort Lauderdale to provide planning, design, and construction services for the addition of three new soccer and lacrosse fields at Mills Pond Park. The existing park located at 2201 N.W. 9th Avenue (Powerline Road) has three lighted soccer fields, one un-lighted soccer field, and five lighted softball fields. The improvements to the park include three new fields and all associated sports lighting, drainage, and irrigation, as well as a future restroom/concession building, new parking, walkways, and landscaping. Originally, the city staff and the park’s stakeholders had indicated their desire to have at least 2 of the 3 fields be synthetic turf, and to use organic in-fill material instead of black rubber in-fill material for them. Working with the City and stakeholders, CGA prepared six (6) configuration options for bidding purposes per the City’s desire to see what layout would fit within their construction budget. The City ended up choosing the option with three (3) artificial turf fields and a future restroom. In addition, the City of Fort Lauderdale wanted to continue their emphasis on Sustainability by incorporating Green Design principles such as LED sports lighting, innovative drainage solutions, permeable pavers, and Florida Friendly Landscaping. One of the main reasons that CGA was selected for this project is its excellent team of sub-consultants. The team consisted of Sports Turf One for sports field expertise, Lakdas/Yohalem Engineering for structural engineering, and Nutting Engineering of Florida for geotechnical. Construction of the project began in January 2017 and completed in February 2018. X X X X X 119 General Planning Redevelopment Srvcs Arch Visualizations & 3D Water / Wastewater Eng Electrical Engineering Environmental Srvcs Website Development GIS Mapping & Analysis Surveying and Mapping Urban Design Traffic Engineering Constr Admin / CEI Landscape Architecture Civil Engineering Public Outreach 20. EXAMPLE PROJECT KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETED 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE a. b. c. d. e. STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS In-house CGA services provided for this project: 2016-Ongoing N/A 15 VILLAGe OF KeY BISCAYNe Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and all in-house services identified above. 530 Crandon Boulevard - Civic Center Park Todd Hofferberth 305.365.8900 ext.1213 Key Biscayne, FL Director, Parks and Recreation thofferberth@keybiscayne.fl.gov APPROXIMATE PROJECT SIZE: PROFESSIONAL FEES: CONSTRUCTION COST: 0.5 Acres $ 110,334 $ 2,100,000 (Estimated) CGA was approached by the Village of Key Biscayne to reimagine a lot outside of the Community Center that would inherently create a staple to the village. The CGA design team approached the project as a timeless design that would relate to its surrounding functions of government, recreation and open space and would communicate a continued, upscaled quality. The park’s main component includes a flexible open lawn area that becomes a ‘civic’ green space used for its versatility. The lawn area, outside of its passive day-to-day activity, can become a dynamic space that transforms into event space to hold concerts, food trucks, community fitness activities, and markets to support programming in the Community Center and serve as an economic driver to the area. Other park components include an artwork plaza, a custom pergola design that enhances the branding of the area, sculptural boulder elements, passive congregation areas, and a pump track. The project also included lush landscape improvements, site drainage, and site lighting. X X X X X 120 General Planning Redevelopment Srvcs Arch Visualizations & 3D Water / Wastewater Eng Electrical Engineering Environmental Srvcs Website Development GIS Mapping & Analysis Surveying and Mapping Urban Design Traffic Engineering Constr Admin / CEI Landscape Architecture Civil Engineering Public Outreach 20. EXAMPLE PROJECT KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETED 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE a. b. c. d. e. STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS In-house CGA services provided for this project: 2018 2020 16 TOWN OF DAVIe Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and all in-house services identified above. Nova Drive Improvements jonathan Vogt, Pe 954.797.1082 Davie, FL Town Engineer jonathan_vogt@davie-fl.gov APPROXIMATE PROJECT SIZE: PROFESSIONAL FEES: CONSTRUCTION COST: N/A Acres $ 459,475.00 $ 6,300,000.00 CGA recently completed the design, permitting (SFWMD, CBWCD, THISCD, BC- HCED), and bidding services (2018) for the Nova Drive Improvements project for Town of Davie. The project is currently in construction. The construction scope of work includes 2521 LF of Exfiltration Trench, 4067 LF of RCP (12” to 30” diameter), 75 storm inlets/manholes, regrading of swales, and associated roadway infrastructure improvements. The construction cost is $6.3 million. CGA’s professional services fee for the project is $459,475. The Nova Drive improvements project (from Davie Road to University Drive) includes upgrading of the existing roadway with turn lanes, driveway access, bike lanes, and roadway intersection improvements. The project completed in 2019. X X X X X X 121 General Planning Redevelopment Srvcs Arch Visualizations & 3D Water / Wastewater Eng Electrical Engineering Environmental Srvcs Website Development GIS Mapping & Analysis Surveying and Mapping Urban Design Traffic Engineering Constr Admin / CEI Landscape Architecture Civil Engineering Public Outreach 20. EXAMPLE PROJECT KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETED 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE a. b. c. d. e. STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS In-house CGA services provided for this project: 02/2018 - 05/2019 N/A 17 TOWN OF MIAMI LAKeS Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and all in-house services identified above. Biodiversity Survey & Lake Quality Reporting Carlos Acosta 305.512.7129 Miami Lakes, FL Director Public Works ACostac@miamilakes-fl.gov APPROXIMATE PROJECT SIZE: PROFESSIONAL FEES: CONSTRUCTION COST: 6.2 Acres $ 51,891.19 $ N/A As components of a continuing services contract with the Town, CGA environmental staff conducted the following two projects: Bio-Diversity Survey. Conducted the field inspections to collect plant diversity data within the dense canopy covered 6.2 acres area referred to as ‘Maddens Hammock’. CGA staff collected field data; photo-documented the site; and produced a report on the field inspection findings with table of species observed, general comments on the site condition, invasive species coverage, and condition of native vegetation. Lake Quality Report. Reported on measures to protect and support the long-term viability of the Town’s thirty-one (31) man-made lakes that were created between 1962 and 2004. Tasks included gathering and investigating background information and investigating the current status of the lakes; developing suggested maintenance and program scenarios; attending public outreach and Town meetings; and producing Guidelines for Homeowners, for HOA’s, businesses and for the Town, and a report to the Town outlining maintenance and program options with actionable objectives and performance measures. The report incorporated water quality samples taken by the Town. X 122 General Planning Redevelopment Srvcs Arch Visualizations & 3D Water / Wastewater Eng Electrical Engineering Environmental Srvcs Website Development GIS Mapping & Analysis Surveying and Mapping Urban Design Traffic Engineering Constr Admin / CEI Landscape Architecture Civil Engineering Public Outreach 20. EXAMPLE PROJECT KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETED 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE a. b. c. d. e. STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS In-house CGA services provided for this project: 2018 - 2019 N/A 18 TOWN OF SURFSIDe Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and all in-house services identified above. Climate Action Plan Duncan Tavares 305.993.1066 Surfside, FL Assistant Town Manager DTavares@townofsurfsidefl.gov APPROXIMATE PROJECT SIZE: PROFESSIONAL FEES: CONSTRUCTION COST: N/A Acres $ 30,541.72 $ N/A Calvin, Giordano & Associates, Inc. assisted the Town of Surfside in their continuing resiliency efforts by providing a series of professional resiliency planning services. CGA staff began by compiling a history of all resiliency efforts the Town had taken to date to establish the ‘where we are at now’ point. CGA coordinated with the Town, and applicable utilities and agencies, and conducted a carbon inventory through the ICLEI ClearPath™ software and established the emissions baseline for the Town. CGA developed a Climate Action Plan for the Town containing feasible, tangible planning policies and actions relating to operations, codes, coordination and public outreach. CGA created a Climate Crisis document outlining the current and projected conditions and projections by time frame; a local and regional overview; a review of shocks, stresses and vulnerabilities; a resource list; and strategic next steps to aid the Town in defining where they want to be how they will get there. The document is intended and structured to be a functional tool and serve as a living document to update as Town measures are implemented and projected conditions are updated. The Climate Crisis documented also incorporated a Town Beach Dune Report, that was separately conducted, that outlined the beach renourishment history and future proposals; current ownership and management structure; current applicable regulatory structure; dune functions and bests management practices; flora and fauna considerations; and beach use BPMs and regulations; to aid the Town in ensuring this protective asset is appropriately managed. CGA also coordinated with the University of Miami LU_Lab that contributed a Community Action Tool Kit for inclusion in the Climate Crisis document. X X X X X X X X X X X X X X X 123 General Planning Redevelopment Srvcs Arch Visualizations & 3D Water / Wastewater Eng Electrical Engineering Environmental Srvcs Website Development GIS Mapping & Analysis Surveying and Mapping Urban Design Traffic Engineering Constr Admin / CEI Landscape Architecture Civil Engineering Public Outreach 20. EXAMPLE PROJECT KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETED 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE a. b. c. d. e. STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS In-house CGA services provided for this project: 2013 - 2017 2017 19 CITY OF OAKLAND PARK Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and all in-house services identified above. expanded Lloyd estates Residential & Industrial Improvements Harris Hamid, Pe 954.630.4477 Oakland Park, FL Director of Engineering & Community Development Email: N/A APPROXIMATE PROJECT SIZE: PROFESSIONAL FEES: CONSTRUCTION COST: N/A Acres $ 960,873.00 $ 7,832,907.00 The Lloyd Estates residential neighborhood is a 17.3 acres area that is bordered on the north by Prospect Road, on the south by Oakland Park Boulevard, on the west by Interstate I-95, and on the east by Andrews Avenue in the City of Oakland Park, Florida. The area has a history of flooding problems due to undersized and/ or damaged underground storm drainage collection systems and poorly graded and silted in swales. The existing area experiences frequent flood conditions even at low intensity rain events due to limited discharge capacity and high tail water conditions downstream of the Sleepy River. In order to increase the flood protection Level of Service (LOS) for the area, the Expanded Lloyd Estates Residential and Industrial Improvements (LERIX) project was designed to provide drainage system improvements including swale reconstruction, drainage collection system expansion, exfiltration trenches, bio-swale with a tidal wetland landscape typology, and an emergency pump station with flood gates on the Sleepy River. The proposed drainage system improvements will be able to mitigate a considerable amount of damage caused by storm events by providing additional water quality treatment and storage volume, thereby reducing the durations of flood conditions. The proposed emergency flood gates and pump station will allow the City to aid in preventing the backflow of water from the SFWMD C-13 canal into the Lloyd Estates area and to facilitate the lowering of the Sleepy River flood stages upstream of the structure so that the existing and proposed drainage system improvements will function optimally. The project received a $5,432,550 grant from FEMA under the Hazard Mitigation Grant Program as a result of Hurricane Wilma. CGA assisted the City with identifying the funding opportunity and with successfully completing the application process. X X X X X X X 124 General Planning Redevelopment Srvcs Arch Visualizations & 3D Water / Wastewater Eng Electrical Engineering Environmental Srvcs Website Development GIS Mapping & Analysis Surveying and Mapping Urban Design Traffic Engineering Constr Admin / CEI Landscape Architecture Civil Engineering Public Outreach 20. EXAMPLE PROJECT KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETED 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE a. b. c. d. e. STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS In-house CGA services provided for this project: 2019 - Ongoing N/A 20 FDeP Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and all in-house services identified above. Oleta River State Park Roadway Improvements Theresa R. Carron 850.245.2721 North Miami, FL Project Manager Theresa.Carron@dep.state.fl.us APPROXIMATE PROJECT SIZE: PROFESSIONAL FEES: CONSTRUCTION COST: N/A Acres $ 100,100.41 $ 284,630.55 The Florida Department of Environmental Protection (FDEP) moved forward with a project to asphalt 0.46 miles of an existing roadway within the Oleta River State Park located in North Miami adjacent to the north end of Biscayne Bay Aquatic Preserve. FDEP contracted with CGA to provide survey, civil engineering, permitting, bid document preparation, and construction administration and Inspection services for this project. Due to the location of an existing building and the County’s requirement for the minimum width of a roadway there were unavoidable direct impacts to 0.07 acres of highly regulated mature mangrove habitat. CGA environmental staff conducted all the site assessments and obtained environmental permits from Miami-Dade Environmental Resource Management, the U.S. Army Corps of Engineers, the South Florida Water Management District (SFWMD) and obtained an exemption letter from the Miami Dade Shoreline Development Review Committee. CGA coordinated with FWS on concerns for impacts to the endangered Florida Bonneted Bat and coordinated the purchase of mitigation bank credits for the mangrove impacts. The project required a cumulative impacts analysis for the SFWMD. X X X X 125 General Planning Redevelopment Srvcs Arch Visualizations & 3D Water / Wastewater Eng Electrical Engineering Environmental Srvcs Website Development GIS Mapping & Analysis Surveying and Mapping Urban Design Traffic Engineering Constr Admin / CEI Landscape Architecture Civil Engineering Public Outreach 20. EXAMPLE PROJECT KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETED 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE a. b. c. d. e. STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS In-house CGA services provided for this project: 2012 - Ongoing 21 TOWN OF SURFSIDe Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and all in-house services identified above. Seawall Replacement Guillermo Olmedillo 305.861.4863 Surfside, FL City Manager golmedillo@townofsurfsidefl.gov APPROXIMATE PROJECT SIZE: PROFESSIONAL FEES: CONSTRUCTION COST: N/A Acres $ 81,600.00 $ 989,000.00 Calvin, Giordano & Associates, Inc. assisted the Town of Surfside by providing a series of professional services in the replacement of ten municipally owned seawalls. CGA staff began by performing an assessment of the Town’s seawalls, ultimately recommending their replacement due to severe degradation. A solution for replacing the seawalls was engineered to maximize the serviceable life of the proposed seawalls. A benthic analysis was conducted on the seawalls and immediate submerged lands as part of the permit application process. Permits were obtained from FDEP, USCOE and Miami-Dade DRER (formerly DERM). Funding to replace the seawalls was solicited and the project was awarded a $494,000 grant from the Florida Inland Navigation District (FIND). After obtaining the grant, CGA staff helped to administer and maintain it throughout the duration of the project. CGA provided construction management services through the preparation of contract documents, utility coordination, and inspections. The project was bid in April, 2014. X X 126 General Planning Redevelopment Srvcs Arch Visualizations & 3D Water / Wastewater Eng Electrical Engineering Environmental Srvcs Website Development GIS Mapping & Analysis Surveying and Mapping Urban Design Traffic Engineering Constr Admin / CEI Landscape Architecture Civil Engineering Public Outreach 20. EXAMPLE PROJECT KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETED 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE a. b. c. d. e. STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS In-house CGA services provided for this project: 08/2014 - Ongoing N/A 22 CITY OF SUNNY ISLeS BeACH Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and all in-house services identified above. Sunny Isles Beach emergency Seawall Replacement Bill evans 305.792.1773 Sunny Isles Beach, FL Assistant City Manager BEvans@sibfl.net APPROXIMATE PROJECT SIZE: PROFESSIONAL FEES: CONSTRUCTION COST: N/A Acres $ 138,285.00 $ 1,300,000.00 On August 4, 2014, Calvin, Giordano & Associates, Inc. was contacted by the City of Sunny Isles Beach to assist in providing emergency services to replace a collapsed portion of seawall along the City’s picturesque Intracoastal Park. The seawall had suffered from deteriorated tie-backs and had exceeded its useable life. The August rains had increased the loading on the wall, causing the wall to rotate into waters adjacent to the Intracoastal Waterway. CGA environmental staff immediately obtained emergency authorization from the jurisdictional agencies to begin repairs, keeping DERM the USCOE, and DEP continuously apprised of all activity. CGA quickly responded to the City’s request for design, permitting and construction inspection of the emergency demolition and replacement. Due to the age and deteriorated state, the entire 669 linear feet of seawall needed to be replaced. CGA quickly prepared plans and applications for submittal to DERM, USACE and the City Building Department for review and approval. CGA expedited the permit review process while the Contractor was on-site performing emergency repairs. CGA also provided construction engineering and inspection services throughout the duration of demolition and construction. X X 127 General Planning Redevelopment Srvcs Arch Visualizations & 3D Water / Wastewater Eng Electrical Engineering Environmental Srvcs Website Development GIS Mapping & Analysis Surveying and Mapping Urban Design Traffic Engineering Constr Admin / CEI Landscape Architecture Civil Engineering Public Outreach 20. EXAMPLE PROJECT KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETED 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE a. b. c. d. e. STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS In-house CGA services provided for this project: 1997 - Ongoing 23 CITY OF DANIA BeACH Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and all in-house services identified above. Miscellaneous engineering Services Marjorie Craig, Pe 954.924.6800 Dania Beach, FL Deputy Public Services Director mcraig@daniabeachfl.gov APPROXIMATE PROJECT SIZE: PROFESSIONAL FEES: CONSTRUCTION COST: N/A Acres $ N/A $ N/A Calvin, Giordano & Associates, Inc. (CGA) has been providing Continuing Professional Services for the City of Dania Beach’s Public Services Department since 1997. Historically, CGA has worked on DRC reviews, permit reviews, and water, sewer, park improvement, drainage and roadway design projects for the City. The current engineering continuing services contract includes miscellaneous engineering design projects, such as the current water main improvement project which includes 2000 LF of new 12” watermains, as well as providing “as-needed” services to the Public Services Department including Civil Engineering, Surveying, Electrical Engineering, Traffic Engineering, and Construction Services. The CGA team is currently responsible for review of the engineering/utility/ROW permit applications submitted through building services department as well as consultant management and project oversight for city water, sewer, stormwater, roadway and CIP projects. The CGA team also provides assistance to the Deputy Director and Director for numerous other public works services such as addressing resident complaints, miscellaneous tasks for the City Manager, and other city engineer day to day tasks. CGA is successfully helping the City by staffing an in-house engineer and supplementing with additional staff as needed for plans review and other project related tasks. X X X X X X 128 General Planning Redevelopment Srvcs Arch Visualizations & 3D Water / Wastewater Eng Electrical Engineering Environmental Srvcs Website Development GIS Mapping & Analysis Surveying and Mapping Urban Design Traffic Engineering Constr Admin / CEI Landscape Architecture Civil Engineering Public Outreach 20. EXAMPLE PROJECT KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETED 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE a. b. c. d. e. STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS In-house CGA services provided for this project: 2017 - Ongoing N/A 24 BAL HARBOUR VILLAGe Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and all in-house services identified above. engineering Services Mike Alvarez, CGC, PWLF 786.566.3562 Bal Harbour Village, FL Utility Compliance Officer malvarez@balharbourfl.gov APPROXIMATE PROJECT SIZE: PROFESSIONAL FEES: CONSTRUCTION COST: XXXXX Acres $ XXX,XXX $ XXX,XXX Calvin, Giordano & Associates, Inc. (CGA) began providing professional services to Bal Harbour Village in 2017. Currently, CGA has a Continuing Engineering Services Agreement with Bal Harbour Village in order to assist the Village in various design projects and plan review services. These services include Civil Engineering, Electrical Engineering, Surveying, GIS, and Construction Services. On-going services for Bal Harbour Village: • Building Department Public Works Plan Review and Utilities Plan Review • Sunshine 811 Services – Manage Dig Tickets and Design Ticket Response • Florida Department of Environmental Protection – NPDES Annual Reporting, MDC MS4 TMDL Prioritization Plan and Assessment Plan • Miami-Dade County Department of Regulatory and Economic Resources Reporting – Sanitary Sewer System Modeling and Water Usage Reporting • GIS Database Verification and Updates – Water, Sewer, Drainage, and Site Lighting Current Design / Construction Projects • P.S. No. 1 Drainage Improvements – Project Management, Bidding, Engineering During Construction, and Construction Services • Phase-3(a) Infrastructure Improvements – Project Management, Civil Engineering Design, Bidding, Engineering During Construction, and Construction Services • Phase-2(b) Water Main Replacement – Project Management, Exploratory Investigation via Geotechnical Engineering and Subsurface Underground Exploratory • Park Dr. 16” WM Abandonment and Replacement Review – QA/QC of the design plans, Construction Services. X X X X X X 129 General Planning Redevelopment Srvcs Arch Visualizations & 3D Water / Wastewater Eng Electrical Engineering Environmental Srvcs Website Development GIS Mapping & Analysis Surveying and Mapping Urban Design Traffic Engineering Constr Admin / CEI Landscape Architecture Civil Engineering Public Outreach 20. EXAMPLE PROJECT KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETED 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE a. b. c. d. e. STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS In-house CGA services provided for this project: 2013 - 2018 2018 25 TOWN OF DAVIe Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and all in-house services identified above. Davie Road Phase I and II jonathan Vogt, Pe 954.797.1113 Davie, FL Town Engineer jonathan_vogt@davie-fl.gov APPROXIMATE PROJECT SIZE: PROFESSIONAL FEES: CONSTRUCTION COST: N/A Acres $ 618,858.00 $ 3,665,749.00-Ph I|$2,400,00.00-Ph II Phase I: This project, which was partially funded by a FDOT County Incentive Grant, included the widening of Davie Rd from 4 lanes to 6 lanes between SR 84 and Nova Dr. The scope included adding a median, an additional lane in each direction, bike lanes, a new signal at Nova Dr and Davie Rd to accommodate the wider roadway, pedestrian upgrades, tree relocations and removals, drainage and lighting modifications, utility coordination, and signal modifications at Reese Rd to accommodate proposed dual left turns from southbound Davie Rd to Reese Rd. This corridor, faced with constrained right of way, had to accommodate the widening to six lanes while maintaining right turn lanes where there were existing ones. Permitting was required through the local drainage district, Broward County Highway Construction and Engineering Division, FDOT for work near SR 84, SFWMD, and the Town of Davie. Harmonization with private right of way and changes to access due to the median, required coordination with the businesses. Phase II: This phase was funded by a Transportation Enhancement grant through the FDOT D4, which required it to follow FDOT LAP submittal requirements. It consisted of improvements to Davie Rd from Nova Dr (SW 24th St) to SW 39th St. The scope included construction of a landscaped median, widening existing sidewalks, milling and resurfacing, signing and pavement markings, adding bicycle lanes, drainage, tree relocations and removals, pedestrian lighting and conventional roadway lighting modifications. This project also included replacing the school zone flashing beacon on Davie Rd north of SW 37th St, signal modifications and guide sign assembly at 39 St. Permitting was required through CBWCD, THISCD, SFWMD, Broward County Highway Construction and Engineering Division (BCHCED), Broward County Traffic Engineering Division (BCTED), FDOT and the Town of Davie. X X X X X X 130 General Planning Redevelopment Srvcs Arch Visualizations & 3D Water / Wastewater Eng Electrical Engineering Environmental Srvcs Website Development GIS Mapping & Analysis Surveying and Mapping Urban Design Traffic Engineering Constr Admin / CEI Landscape Architecture Civil Engineering Public Outreach 20. EXAMPLE PROJECT KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETED 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE a. b. c. d. e. STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS In-house CGA services provided for this project: 2018 26 CITY OF MIAMI BeACH Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and all in-house services identified above. Beachwalk II Phase II from 3rd St to 5th St (LAP Funded) Daniel Cevallos 305.673.7071 Miami Beach, FL Project Manager DanielCevallos@miamibeachfl.gov APPROXIMATE PROJECT SIZE: PROFESSIONAL FEES: CONSTRUCTION COST: N/A Acres $ N/A $ 1,629,456.50 This project consisted of the construction of an ongrade ADA compliant pedestrian 15-foot paver walkway, with bollard lights, landscaping and irrigation. Other work consists of exotic dune vegetation removal and replacement with dune enhancements such as native dune vegetation species and beach compatible dune fill and irrigation for the landscaping. The path lighting installation meets Florida Fish and Wildlife Commission’s marine turtle nesting requirements. X 131 General Planning Redevelopment Srvcs Arch Visualizations & 3D Water / Wastewater Eng Electrical Engineering Environmental Srvcs Website Development GIS Mapping & Analysis Surveying and Mapping Urban Design Traffic Engineering Constr Admin / CEI Landscape Architecture Civil Engineering Public Outreach 20. EXAMPLE PROJECT KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETED 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE a. b. c. d. e. STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS In-house CGA services provided for this project: 12/2018 - Ongoing N/A 27 CITY OF SUNNY ISLeS BeACH Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and all in-house services identified above. Collins Avenue (SR A1A) Decorative Lighting Paul Abbott 305.773.6255 Sunny Isles Beach, FL City Representative ptgbhtl@aol.com APPROXIMATE PROJECT SIZE: PROFESSIONAL FEES: CONSTRUCTION COST: N/A Acres $ N/A $ 4,830,000.00 Collins Avenue (SR A1A) Decorative Lighting from Bayview Drive to 192nd Street Project includes the removal of existing conventional lighting poles, installation of new pole foundations or rehabilitation of existing pole foundations, installation of new decorative poles, installation of electrical conduits and wires and MOT supervision; X 132 General Planning Redevelopment Srvcs Arch Visualizations & 3D Water / Wastewater Eng Electrical Engineering Environmental Srvcs Website Development GIS Mapping & Analysis Surveying and Mapping Urban Design Traffic Engineering Constr Admin / CEI Landscape Architecture Civil Engineering Public Outreach 20. EXAMPLE PROJECT KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETED 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE a. b. c. d. e. STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS In-house CGA services provided for this project: 2012 - 2017 N/A 28 FDOT DISTRICT 4 Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and all in-house services identified above. Various General CeI Consultant Construction Support D4 Stacey Sasalay 954.777.4382 Fort Lauderdale, FL Project Manager Email - N/A APPROXIMATE PROJECT SIZE: PROFESSIONAL FEES: CONSTRUCTION COST: N/A Acres $ N/A $ N/A C9855 FIN # 228027-8-62-01 CEI Services: Task Work Order (TWO) General Assigned Contract providing various CEI project staff as needed. Task Wotk Orders (‘IWO) driven Contract. Tasks assignments to provide experienced staff support as needed to perform construction engineering inspection and administrative functions that involves multiple projects at the same time, such as districtwide inspection of signalization and lighting, asphalt plant inspection, residency contract support, resident compliance support and scheduling. Over 25 TWO’s have been executed by department since contract award. Contract Amount Max: $1,500,000.00 X 133 General Planning Redevelopment Srvcs Arch Visualizations & 3D Water / Wastewater Eng Electrical Engineering Environmental Srvcs Website Development GIS Mapping & Analysis Surveying and Mapping Urban Design Traffic Engineering Constr Admin / CEI Landscape Architecture Civil Engineering Public Outreach 20. EXAMPLE PROJECT KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETED 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE a. b. c. d. e. STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS In-house CGA services provided for this project: Ongoing N/A 29 CITY OF FORT LAUDeRDALe Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and all in-house services identified above. CeI Continuing Service Contract Scott Teschky 954.828.6195 Fort Lauderdale, FL Senior Project Manager STeschky@fortlauderdale.gov APPROXIMATE PROJECT SIZE: PROFESSIONAL FEES: CONSTRUCTION COST: N/A Acres $ N/A $ N/A Miscellaneous Engineering & Construction Inspection Services: Ongoing continuing services contract providing general engineering and inspection services. CEI services under a continuing contract as authorized by individual Task Orders for individual projects. It was the intent of the City to use the selected firms on an “as- needed” basis. X 134 General Planning Redevelopment Srvcs Arch Visualizations & 3D Water / Wastewater Eng Electrical Engineering Environmental Srvcs Website Development GIS Mapping & Analysis Surveying and Mapping Urban Design Traffic Engineering Constr Admin / CEI Landscape Architecture Civil Engineering Public Outreach 20. EXAMPLE PROJECT KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETED 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE a. b. c. d. e. STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS In-house CGA services provided for this project: Ongoing N/A 30 FDOT District 6 Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and all in-house services identified above. Districtwide Miscellaneous CeI Inspection Services Keith McIntosh 305.640.7438 FDOT District 6, FL Construction Project Manager keith.mcintosh@dot.state.fl.us APPROXIMATE PROJECT SIZE: PROFESSIONAL FEES: CONSTRUCTION COST: N/A Acres $ N/A $ N/A C9073 FIN # 250711-5-62-05 CEI Services: Task Wotk Orders (‘IWO) driven Contract. Tasks assignments to provide experienced staff support as needed to perform construction engineering inspection and administrative functions that involves multiple projects at the same time, such as districtwide inspection of signalization and lighting, asphalt plant inspection, residency contract support, resident compliance support and scheduling. Approximately 10 TWO’s were executed by department since contract award. Contract amount max is $1.5 million. X 135 G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 26. NAMES OF KEY PERSONNEL (From Section E, Block 12) 29. EXAMPLE PROJECTS KEY NO. 1 2 3 4 5 NO. 6 7 8 9 10 TITLE OF EXAMPLE PROJECT (From Section F)TITLE OF EXAMPLE PROJECT (From Section F) 27. ROLE IN THIS CONTRACT (From Section E, Block 13) 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in “Example Projects Key” section below before completing table. Place “X” under project key number for participation in same or similar role.) 1 2 3 4 5 6 7 8 9 10 STANDARD FORM 330 (REV. 8/2016) - SF330-G_CGA_MATRix xOverall Project ManagerJenna Martinetti, PE x x x x x x x x EngineerJames Messick, PE x x x x x xEngineering/PermittingMohammed Sharifuzzaman, PE x x x x x x x x Civil EngineerNicholas W. Kanelidis, PE x EngineerHeidi Belle Henderson, PE Electrical EngineerJorge R. Cervantes, PE x x x x x EngineerJulio E. Gonzalez, PE CAD TechnicianKatharine Kupsky x x x x x x x x x Surveying and MappingSteven M. Watts, PSM x x x x x x x x Surveying and MappingPablo Dominguez x x x x x x x xEnvironmental SpecialistSandra Lee, AiCP CEP, CFM, LEED AP BD+C x x x x x x Environmental SpecialistDrew Lindemann x xLandscape ArchitectTammy Cook-Weedon, PLA, LEED AP BD+C x x x x x x x x xLandscape UrbanistGianno Feoli x x x x x x Landscape ArchitectMichael D. Conner, ASLA, PLA, iSA x x x x irrigation/Site DesignMarcos Mendoza x x x x Landscape DesignerMaria A. Alonso, NCiDQ, ASiD, ASLA x x Landscape DesignerDominic James Mack iii, Assoc. ASLA x x x xCEi Senior Project EngineerMohamed Mabrouk, PE x CEi Senior Project EngineerErik Padron, PE North Bay Road Pedestrian Bridge Andrews Avenue Roadway improvements Middle Beach Recreational Corridor - Phase ii Dania Jai-Alai Onsite & Offsite improvements Hallandale Beach NE Quad and SW Drainage improvements Windmill Park Expansion and Renovation Rickenbacker Causeway Bridge Rehabilitation Rolling Oaks Park - Pedestrian Trail Project Dr. Von D. Mizell-Eula Johnson State Park Dania Cove Park Page 1 of 3 136 G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 26. NAMES OF KEY PERSONNEL (From Section E, Block 12) 29. EXAMPLE PROJECTS KEY NO. 1 2 3 4 5 NO. 6 7 8 9 10 TITLE OF EXAMPLE PROJECT (From Section F)TITLE OF EXAMPLE PROJECT (From Section F) 27. ROLE IN THIS CONTRACT (From Section E, Block 13) 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in “Example Projects Key” section below before completing table. Place “X” under project key number for participation in same or similar role.) 1 2 3 4 5 6 7 8 9 10 STANDARD FORM 330 (REV. 8/2016) - SF330-G_CGA_MATRix Project AdministratorHugo DaSilvia, PE xProject AdministratorFelix Garcia, PE Project AdministratorBernnon Artola PiO/Landscape inspectorErin Sudman Senior inspectorReynaldo Alfonso Senior inspectorLance Robinson Senior inspector/Senior Bridge inspectorGary Craig Senior inspectorJulio Antonio inspectorVictor Murphy Assistant PA/CSSReza Shams Page 1 of 3 North Bay Road Pedestrian Bridge Andrews Avenue Roadway improvements Middle Beach Recreational Corridor - Phase ii Dania Jai-Alai Onsite & Offsite improvements Hallandale Beach NE Quad and SW Drainage Improvements Windmill Park Expansion and Renovation Rickenbacker Causeway Bridge Rehabilitation Rolling Oaks Park - Pedestrian Trail Project Dr. Von D. Mizell-Eula Johnson State Park Dania Cove Park 137 G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 26. NAMES OF KEY PERSONNEL (From Section E, Block 12) 29. EXAMPLE PROJECTS KEY NO.NO.TITLE OF EXAMPLE PROJECT (From Section F)TITLE OF EXAMPLE PROJECT (From Section F) 27. ROLE IN THIS CONTRACT (From Section E, Block 13) 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in “Example Projects Key” section below before completing table. Place “X” under project key number for participation in same or similar role.) STANDARD FORM 330 (REV. 8/2016) - SF330-G_CGA_MATRix 16 17 18 19 2015 14 13 12 11 20191817161514131211 xOverall Project ManagerJenna Martinetti, PE x x x x x EngineerJames Messick, PE x x x x xEngineering/PermittingMohammed Sharifuzzaman, PE x x x x x Civil EngineerNicholas W. Kanelidis, PE x EngineerHeidi Belle Henderson, PE Electrical EngineerJorge R. Cervantes, PE x x x EngineerJulio E. Gonzalez, PE xCAD TechnicianKatharine Kupsky x x x x x x xSurveying and MappingSteven M. Watts, PSM x x x x Surveying and MappingPablo Dominguez x x x Environmental SpecialistSandra Lee, AiCP CEP, CFM, LEED AP BD+C x x x x x x Environmental SpecialistDrew Lindemann x x x x x x xLandscape ArchitectTammy Cook-Weedon, PLA, LEED AP BD+C x x x x x x xLandscape UrbanistGianno Feoli x x x x x Landscape ArchitectMichael D. Conner, ASLA, PLA, iSA x x x irrigation/Site DesignMarcos Mendoza x x x x x Landscape DesignerMaria A. Alonso, NCiDQ, ASiD, ASLA x x Landscape DesignerDominic James Mack iii, Assoc. ASLA x x CEi Senior Project EngineerMohamed Mabrouk, PE x CEi Senior Project EngineerErik Padron, PE Oak Grove Park improvements Nova Drive improvements Fire Station Commemorative Plaza Biodiversity Survey & Lake Quality Reporting SW 2nd Avenue Climate Action Plan Mills Pond Park Expanded Lloyd Estates Residential & industrial improve. 530 Crandon Boulevard - Civic Center Park Oleta River State Park Roadway improvements Page 2 of 3 138 G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 26. NAMES OF KEY PERSONNEL (From Section E, Block 12) 29. EXAMPLE PROJECTS KEY NO.NO.TITLE OF EXAMPLE PROJECT (From Section F)TITLE OF EXAMPLE PROJECT (From Section F) 27. ROLE IN THIS CONTRACT (From Section E, Block 13) 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in “Example Projects Key” section below before completing table. Place “X” under project key number for participation in same or similar role.) STANDARD FORM 330 (REV. 8/2016) - SF330-G_CGA_MATRix 16 17 18 19 2015 14 13 12 11 20191817161514131211 Project AdministratorHugo DaSilvia, PE Project AdministratorFelix Garcia, PE Project AdministratorBernnon Artola PiO/Landscape inspectorErin Sudman Senior inspectorReynaldo Alfonso Senior inspectorLance Robinson Senior inspector/Senior Bridge inspectorGary Craig Senior inspectorJulio Antonio inspectorVictor Murphy Assistant PA/CSSReza Shams Page 2 of 3 Oak Grove Park improvements Nova Drive improvements Fire Station Commemorative Plaza Biodiversity Survey & Lake Quality Reporting SW 2nd Avenue Climate Action Plan Mills Pond Park Expanded Lloyd Estates Residential & industrial improve. 530 Crandon Boulevard - Civic Center Park Oleta River State Park Roadway improvements 139 G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 26. NAMES OF KEY PERSONNEL (From Section E, Block 12) 29. EXAMPLE PROJECTS KEY NO.NO.TITLE OF EXAMPLE PROJECT (From Section F)TITLE OF EXAMPLE PROJECT (From Section F) 27. ROLE IN THIS CONTRACT (From Section E, Block 13) 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in “Example Projects Key” section below before completing table. Place “X” under project key number for participation in same or similar role.) STANDARD FORM 330 (REV. 8/2016) - SF330-G_CGA_MATRix 26 27 28 29 3025 24 23 22 21 30292827262524232221 Overall Project ManagerJenna Martinetti, PE x x x x EngineerJames Messick, PE x x Engineering/PermittingMohammed Sharifuzzaman, PE x x x xCivil EngineerNicholas W. Kanelidis, PE x x x EngineerHeidi Belle Henderson, PE x x Electrical EngineerJorge R. Cervantes, PE x x x EngineerJulio E. Gonzalez, PE x CAD TechnicianKatharine Kupsky x x x Surveying and MappingSteven M. Watts, PSM x x Surveying and MappingPablo Dominguez x x xEnvironmental SpecialistSandra Lee, AiCP CEP, CFM, LEED AP BD+C x x x xEnvironmental SpecialistDrew Lindemann x x Landscape ArchitectTammy Cook-Weedon, PLA, LEED AP BD+C x x Landscape UrbanistGianno Feoli x x Landscape ArchitectMichael D. Conner, ASLA, PLA, iSA x x irrigation/Site DesignMarcos Mendoza x x Landscape DesignerMaria A. Alonso, NCiDQ, ASiD, ASLA x x Landscape DesignerDominic James Mack iii, Assoc. ASLA x CEi Senior Project EngineerMohamed Mabrouk, PE x x x x x x x CEi Senior Project EngineerErik Padron, PE x x x x x x Seawall Replacement Beachwalk ii Phase ii from 3rd St to 5th St (LAP Funded) Sunny isles Beach Emergency Seawall Replacement Collins Avenue (SR A1A) Decorative Lighting Miscellaneous Engineering Services - Dania Beach Various General CEi Consultant Construction Support D4 Engineering Services - Bal Harbour Village CEi Continuing Service Contract Davie Road Phase i and ii Districtwide Miscellaneous CEi inspection Services Page 3 of 3 140 G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 26. NAMES OF KEY PERSONNEL (From Section E, Block 12) 29. EXAMPLE PROJECTS KEY NO.NO.TITLE OF EXAMPLE PROJECT (From Section F)TITLE OF EXAMPLE PROJECT (From Section F) 27. ROLE IN THIS CONTRACT (From Section E, Block 13) 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in “Example Projects Key” section below before completing table. Place “X” under project key number for participation in same or similar role.) STANDARD FORM 330 (REV. 8/2016) - SF330-G_CGA_MATRix 26 27 28 29 3025 24 23 22 21 30292827262524232221 Project AdministratorHugo DaSilvia, PE x x x x Project AdministratorFelix Garcia, PE x x x x Project AdministratorBernnon Artola x x x PiO/Landscape inspectorErin Sudman x x x x Senior inspectorReynaldo Alfonso x x x x Senior inspectorLance Robinson x x x Senior inspector/Senior Bridge inspectorGary Craig x x x Senior inspectorJulio Antonio x x x x inspectorVictor Murphy x x x Assistant PA/CSSReza Shams x x x Page 3 of 3 Seawall Replacement Beachwalk ii Phase ii from 3rd St to 5th St (LAP Funded) Sunny isles Beach Emergency Seawall Replacement Collins Avenue (SR A1A) Decorative Lighting Miscellaneous Engineering Services - Dania Beach Various General CEi Consultant Construction Support D4 Engineering Services - Bal Harbour Village CEi Continuing Service Contract Davie Road Phase i and ii Districtwide Miscellaneous CEi inspection Services 141 142 143 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)163 5. NAME OF FIRM PART I - CONTRACT-SPECIFIC QUALIFICATIONS ARCHITECT - ENGINEER QUALIFICATIONS A. CONTRACT INFORMATION 1. TITLE AND LOCATION (City and State) 2. PUBLIC NOTICE DATE 3. SOLICITATION OR PROJECT NUMBER B. ARCHITECT-ENGINEER POINT OF CONTACT C. PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors.) 4. NAME AND TITLE 8. E-MAIL ADDRESS7. FAX NUMBER6. TELEPHONE NUMBER (Check)PRIMEJ-V PARTNERSUBCON- TRACTOR9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT a. b. c. d. e. f. STANDARD FORM 330 (REV. 8/2016) D. ORGANIZATIONAL CHART OF PROPOSED TEAM (Attached) CHECK IF BRANCH OFFICE CHECK IF BRANCH OFFICE CHECK IF BRANCH OFFICE CHECK IF BRANCH OFFICE CHECK IF BRANCH OFFICE CHECK IF BRANCH OFFICE AUTHORIZED FOR LOCAL REPRODUCTION x Chrome Engineering, Inc.16650 N. Kendall Drive, Suite 205 Miami, Florida 33196 Structural Engineering Services for transit and transportation related structures (bridges, walls, signs) as well as facilities (i.e. pump stations buildings, etc.) Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01, Sunny Isles Beach, Florida August 11th, 2020 RFQ No. 20-07-01 Oscar J. Cruz, P.E., President Chrome Engineering, Inc. (305) 432-6826 n/a ocruz@chromeeng.com x 164 12. NAME 13. ROLE IN THIS CONTRACT 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE b. WITH CURRENT FIRMa. TOTAL 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) 15. FIRM NAME AND LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 2 a. b. c. d. (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) e. Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Oscar J. Cruz, P.E.Senior Structural Engineer 20 2 Chrome Engineering, Inc. Miami, Florida BS Civil Engineering, FIU, Dec. 2000 MS Structural Engineering Courses, 2006 Professional Qualifications/Training:Temporary Traffic Control (TTC) Advanced Level, FDOT 2019 OpenBridge Designer (Bentley) FLUG Training Forum, 2019. G-72E Control Structure, Hialeah Gardens, Florida (FDOT D6 Project) Structural Engineer in charge of the calculations and plans for a South Florida Water Management District Control Structure within the C-7 canal in Miami-Dade County. Services include the design of a cast in place concrete twin box culvert, anchored steel sheet pile walls, cast in place wing walls and spilling well steel platforms. Responsibilities included the preparation of construction cost estimates and project specifications. Construction Cost: $2M. 2019 2020 (anticipated) Florida Professional Engineer License # 63889 (2006) Bridge design and bridge rehabilitation projects, including fender replacements, retaining walls (MSE and CIP), critical sheet pile walls, seawalls, sound barrier walls, FDOT Tri-Chord sign structures (Cantilever, Butterfly and Span), ITS structures, mast arms, strain poles, light poles, box culverts, corrugated pipe culverts, steel structures well as bridge load ratings. Seminars: OpenBridge Designer FLUG Training Forum, 2019. FDOT Advanced MOT, 2019. FES Member (2016) x 2019 2020 Hard Rock Stadium Pedestrian Bridges and Tunnels, Miami Gardens, Florida (City of Miami Gardens Project) Structural Engineer in charge of shop drawings verification and design calculations review for 2 prefabricated truss bridges and 2 precast concrete arch tunnels constructed at the Hard Rock Stadium in Miami Gardens, Florida. Design elements included steel design, steel sheet piling, MSE Wall control drawings, joints, bearing plates and waterproofing systems among others. Responsibilities also included assisting the CEI team with structural design related RFI’s, and the installation of illuminated signs to the existing trusses. Const. cost: $12M. x MacArthur Causeway East Bridge Repairs, Miami, Florida (FDOT D6 Project)2019 2020 EOR in charge of the preparation of an Engineering Analysis Report (EAR) required for the presence of non-structural deck cracks found in the structure after the completion of partial concrete deck replacement. Analysis involved site inspections, analysis and recommendations following the requirements of FDOT Specifications 400-21.4 and 400-21.5. Responsibilities also included Load Ratings to allow heavy equipment to be carried by the bridge as well as a temporary work platform at Pier 26. Construction Cost: $6M x 311 & 911 Support Area Renovation, Doral, Florida (Miami-Dade County Project) 2019 2021 (anticipated) Structural EOR for the construction of a two level 8,500 square foot area at the Lightspeed Facility in Miami-Dade County, Florida. The two level structure will be built within an existing building and is designed to support mechanical equipment at the mezzanine level and to provide accommodations for the staff responding to 311 and 911 calls. The proposed supporting frame are steel columns and beams supported on concrete foundations. The roof is supported by steel joists. Construction Cost: $1M. DW Local Government In-Depth Bridge Inspection; Miami-Dade County, Florida (FDOT District 6 Project)2019 n/a Structural Engineer assisting with the structural inspections for multiple Local Government owned Bridges. Activities included the Bridge Inspection Report preparation using BrM and BMS for 20 bridges with multiple owners including, Miami-Dade County, City of Miami Beach, City of Homestead and Miami-Dade Transit. Bridge types ranged from CIP slabs, pretressed slab units and steel configurations all supported on pile foundations. QA/QC of load rating reports to confirm that rating values were accurately reported in BrM. Fee: $70K. x 165 12. NAME 13. ROLE IN THIS CONTRACT 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE b. WITH CURRENT FIRMa. TOTAL 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) 15. FIRM NAME AND LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 2 a. b. c. d. (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) e. Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Jorge A. Canales, P.E.Senior Structural Engineer (QA/QC) 50 2 Chrome Engineering, Inc. Miami, Florida BS Civil Engineering, University of Missouri, 1978 BS Building Engineering Lincoln University, 1968 G-72E Control Structure, Hialeah Gardens, Florida (FDOT D6 Project) Structural Engineer in charge of the quality control for calculations and plans for a South Florida Water Management District Control Structure within the C-7 canal in Miami-Dade County. Services include the design of a cast in place concrete twin box culvert, anchored steel sheet pile walls, cast in place wing walls and spilling well steel platforms. Responsibilities included the preparation of construction cost estimates and project specifications. Construction Cost: $2M. 2019 2020 (anticipated) Florida Professional Engineer License # 60444 (2003) x 2019 2020 Hard Rock Stadium Pedestrian Bridges and Tunnels, Miami Gardens, Florida (City of Miami Gardens Project) Structural Engineer in charge of shop drawings verification and design calculations review for 2 prefabricated truss bridges and 2 precast concrete arch tunnels constructed at the Hard Rock Stadium in Miami Gardens, Florida. Design elements included steel design, steel sheet piling, MSE Wall control drawings, joints, bearing plates and waterproofing systems among others. Responsibilities also included assisting the CEI team with structural design related RFI’s, and the installation of illuminated signs to the existing trusses. Const. cost: $12M. x Port Everglades Bond Survey, Broward County Public Works Department Seaport Engineering and Construction Division 2015 n/a Senior Inspector. Responsible for the visual inspection of the structural seawalls, fender systems and bollards, cruise terminals building parking garage structures and over 20 buildings structures own and maintain by the Port Authority. Additionally a list of the found deficiencies were presented along with an probable estimate of construction cost. Design Fee: $150K. x Miami Dade Expressway Auhority, Asset Management Contract - Bridges, Signs and High Masts, Miami-Dade County, Florida 2010 n/a Project Manager. Responsible for the management of inspection teams including the execution of the planning, scheduling and inspections of bridges, signs and high mast poles in Miami-Dade County within the MDX system, for the last four years. Coordination with MDX personnel in preparing and updating a data based system for work recommendations. Responsible for the preparation of work recommendations in the FDOT MMS. Contract Fee: $1.5M. FDOT District 6, Districtwide Bridge Design of Minor and Major Structural Repairs. SR 5 (US 1) at Snake Creek , Monroe County, Florida.2005 2006 Project Manager responsible for the special inspection, design and preparation of contract documents for the rehabilitation/repairs of bascule bridge north approach slab and the construction of a steel sheet piling wall along the ocean side to stabilized the movement of the north embankment. Provided engineering support during the post-design services, reviewed shop drawings and/or revision to the plans due to unanticipated field conditions. Construction Cost: $2M Mr. Canales provides technical expertise in the design and plan preparation, construction and inspection of highway structures and educational facilities. He has been responsible for the prelimi- nary and final design of various highway structures located in multiple states, provides in-house quality control and quality assurance in the design and plan preparation of highway and building structures, and roadway design for state and local municipal agencies. 166 12. NAME 13. ROLE IN THIS CONTRACT 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE b. WITH CURRENT FIRMa. TOTAL 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) 15. FIRM NAME AND LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 2 a. b. c. d. (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) e. Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Gregory P. Dover, P.E.Senior Structural Engineer 29 1 Chrome Engineering, Inc. Miami, Florida BS Civil Engineering, North Carolina State University, 1990 2020 2020 Florida Professional Engineer License # 57684 (2001) North Carolina Professional Engineer License # 020635 (1995) South Carolina Professional Engineer License # 20273 (2000) x x Henry Kinney Tunnel Rehabilitation and Pedestrian Plaza Structure, Ft. Lauderdale, Florida (FDOT District 4 Project)2016 2019 Project manager and EOR for the design of sign and signal structures approaching the tunnel, including DMS signs, entrance gates, over-height vehicle detection structures, and the Pedestrian Plaza Structure (tunnel extension) to capture urban space for pedestrians along the Las Olas Riverwalk in Ft. Lauderdale. Proposed modification to this category 2 structure, required close coordination with FDOT Central office, FDOT D4 structures, D4 maintenance, City of Ft. Lauderdale and other stakeholder agencies. Const. Cost: $6M. 2017 2019 7-Mile Bridge Rehabilitation, Monroe County, Florida (FDOT District 6 Project)2009 2019 Structural Engineer for the rehabilitation of a 35,000-foot-long bridge over the ocean, which is a critical bridge linked to the Florida Keys. This bridge is in the most extreme corrosive marine environment possible, with structural elements permanently in the splash zone resulting in accelerated corrosion, and constant cracks, spalls, and delaminations. Responsibilities included assessment of the existing structural condition and preparation of a design and plans for the bridge rehabilitation and for corrosion protection systems. Mr. Dover's primary structural experience is in concrete and steel bridge design, including advanced structural modeling, and bridge inspection, as well as miscellaneous structures design ranging from retaining walls, overhead signs, traffic signals, to buried drainage structures. His experience includes phase review, design management, and construction project management. Work experience includes private, municipal, county, state, and federal clients. MacArthur Causeway East Bridge Repairs, Miami, Florida (FDOT D6 Project) Structural Engineer assisting in the design of a temporary work platform at Pier 26 required for the implementation of concrete rehabilitation repairs for the existing pier cap. Greg completed the timber design for the proposed temporary platform and reviewed structural calculations and plans submitted to the contractor for submittal to FDOT. Construction Cost: $6M Port Everglades Access Ramps, Ft. Lauderdale, Florida 2020 2020 Structural Engineer assisting in the design of a temporary bracing system to support the proposed AASHTO Type II, III and IV beams specified for the construction of two access ramps at terminal 4 of Port Everglades in Broward County, Florida. Mr. Dover prepared calculations for the tension member coil rod and compression member timber frames and specified the required location for each of the multiple spans under construction. Construction Cost: $7M. SW 136th Street Bridge Replacement, Miami, Florida. (Miami-Dade County Project) EOR and Project Manager for a replacement of a bridge on SW 136th St. over a canal. Bridge was designed as a 3-span continuous deck slab, supported on pile bents and pile end bents. Special bridge aesthetics were coordinated with the County and municipalities to further enhance the end user experience. This project required the incorporation of the approach roadway including sidewalks as well as the preparation of MOT plans to ensure access was provided at all times to vehicles and pedestrians. Construction Cost: $1.5M. 167 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) a. PROJECT OWNER 21. TITLE AND LOCATION (City and State) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 20. EXAMPLE PROJECT KEY NUMBER a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 3 (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. POINT OF CONTACT NAME 23. PROJECT OWNER'S INFORMATION c. POINT OF CONTACT TELEPHONE NUMBER (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)G-72E Control Structure, Hialeah Gardens, Florida FDOT D6 & SFWMD Daniel Raymat, P.E.(305) 338-7782 1 2019 2020 (Anticipated) Construction Document preparation for South Florida Water Management District's G72-E Control Structure within the (SFWMD) C-7 canal. Services include the design of a cast in place concrete twin box culvert, anchored steel sheet pile walls, cast in place wing walls and two spilling well steel platforms, preparation of construction cost estimates and project specifications. The proposed control structure is approximately 90ft long x 20' high. The cast in place box culvert is a twin box 7' wide x 7' high. The proposed steel sheet pile walls are anchored, and range from 15' to 25' in height with a total length of 90'. The proposed spilling well platforms are approximately 23' long, composed of steel framing supported on precast piles. Approximate Construction Cost is $2.0M. This design project requires extensive coordination to ensure constructable plans are prepared, overall structure dimensions were optimized for functionality and operations via multidisciplinary coordination workshops. Chrome Engineering, Inc.Miami, Florida Structural Engineer (Pictures of similar project) 168 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) a. PROJECT OWNER 21. TITLE AND LOCATION (City and State) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 20. EXAMPLE PROJECT KEY NUMBER a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 3 (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. POINT OF CONTACT NAME 23. PROJECT OWNER'S INFORMATION c. POINT OF CONTACT TELEPHONE NUMBER (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) FDOT D6 & City of Miami Gardens Erik Sibila, P.E.(305) 283-9816 2 2019 2019 Construction of 2 prefabricated steel truss bridges over NW 199 St. and 2 precast concrete arch tunnels constructed at the Hard Rock Stadium in Miami Gardens, Florida. Design elements included steel trusses, steel sheet piling, MSE Wall control drawings, joints, bearing plates, prestressed piles and waterproofing systems among others. Responsibilities included assisting the Construction Engineering Inspection team with multiple shop drawing reviews and structural design RFI's. Reviews such as bridge erection plans showing the size and location of proposed cranes for bridge installations required extensive coordination between structural load capacities and crane operations. Approximate Construction Cost is $15M. This design build project requires concurrent and efficient shop drawing reviews and responses to RFI's. Approvals and modifications to any submittal were based on strict adherence to the project specifications and public safety. An additional task included the design of decorative signs attached to the existing steel truss elements. Chrome Engineering, Inc.Miami, Florida Structural Engineer Hard Rock Stadium Pedestrian Bridges and Tunnels, Miami Gardens, Florida 169 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) a. PROJECT OWNER 21. TITLE AND LOCATION (City and State) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 20. EXAMPLE PROJECT KEY NUMBER a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 3 (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. POINT OF CONTACT NAME 23. PROJECT OWNER'S INFORMATION c. POINT OF CONTACT TELEPHONE NUMBER (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) FDOT D6 Fernando Sanchez, MSCE (305) 989-9646 3 2019 2020 Rehabilitation Project for the MacArthur East Bridge connecting the city of Miami Beach with the city of Miami. The bridge was built in 1957. It is 2,155' long and 34 sections of approach of pre-tensioned concrete beams, 15 of them 45' long and remaining 19 are 65' long, as well as 3 main sections of continuous steel beams (70', 105', 70'). LEAD Engineering Contractors assigned Chrome Engineering with specialized engineering design services, including an Engineering Analysis Report (EAR) for the evaluation of non-structural deck cracks found after repairs were performed on the bridge. Our Structural Engineers also provided a Load Rating analysis of the existing steel spans to support the proposed steel painting equipment needed for the rehabilitation of the existing steel beams (main spans). In addition Chrome Engineering Inc., prepared plans and calculations for a steel and timber temporary platform required for access to perform repairs to Pier 26's concrete cap. The proposed platform is supported from the existing concrete cap and hangs from the existing concrete deck. The approximate overall bridge repairs construction cost is $10M. Chrome Engineering, Inc.Miami, Florida Structural Engineer MacArthur Causeway East Bridge Repairs, Miami, Florida 170 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) a. PROJECT OWNER 21. TITLE AND LOCATION (City and State) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 20. EXAMPLE PROJECT KEY NUMBER a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 3 (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. POINT OF CONTACT NAME 23. PROJECT OWNER'S INFORMATION c. POINT OF CONTACT TELEPHONE NUMBER (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) FDOT D6 Alina Fernandez, PE (305) 215-2987 4 2016 2019 The project included the design and analysis calculations for existing and proposed signal mast arms throughout Miami-Dade County to incorporate safety improvements throughout the county. Modifications included backplate installations to new and existing mast arm structures, the addition of of signal heads (from 3 section heads to 5 section heads). Structural analysis reports were prepared following AASHTO LRFDLTS1, LTS-6 and LTS-6 with Appendix C, as modified by the FDOT Structures Manual. Improvements were implemented at the following intersections: SR 25/ Okeechobee Road and West 12th Ave/NW 74th Street, SW 72nd Street (Sunset Drive) and SW 87th Avenue as well as NW 12th Avenue from SW 8th Street to NW 14th Street in Miami, Florida. Approximate construction cost is $1M. Mr. Oscar J. Cruz, P.E. and Mr. Gregory P. Dover, P.E. both provided structural engineering services for this contract during their previous employment at Gannett-Fleming's Miami office. Chrome Engineering, Inc.Miami, Florida Structural Engineer FDOT District 6 Professional Engineering Design Consulting Services Districtwide. Miami, Florida New Signals with Backplates (SW 72nd Street)New Signals with Backplates (SW 87th Avenue) 171 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) a. PROJECT OWNER 21. TITLE AND LOCATION (City and State) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 20. EXAMPLE PROJECT KEY NUMBER a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 3 (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. POINT OF CONTACT NAME 23. PROJECT OWNER'S INFORMATION c. POINT OF CONTACT TELEPHONE NUMBER (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Miami-Dade County, ISD Burton H. Hersh, AIA (305) 446-4877 5 2019 2020 (Anticipated) Chrome Engineering, Inc., prepared structural plans and calculations for the construction of a two level 8,500 square foot area at the Lightspeed Facility in Miami-Dade County, Florida. The two level structure will be built within an existing building and is designed to support mechanical equipment at the mezzanine level and to provide accommodations for the staff responding to 311 and 911 calls. The proposed supporting frame are steel columns and beams supported on concrete foundations. The roof is supported by steel joists. Chrome Engineering also prepared the structural section of the project specifications manual. The design for this enhancement facility is based on the 2017 Florida Building Code (6th Edition). Chrome Engineering, Inc.Miami, Florida Structural Engineer 311 & 911 Support Area Renovation, Doral, Florida 172 TITLE OF EXAMPLE PROJECT (From Section F) G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 1 2 3 4 5 6 7 8 9 10 STANDARD FORM 330 (REV. 8/2016) PAGE 4 26. NAMES OF KEY PERSONNEL (From Section E, Block 12) 27. ROLE IN THIS CONTRACT (From Section E, Block 13) 1 2 3 4 5 6 7 8 9 10 29. EXAMPLE PROJECTS KEY NUMBER TITLE OF EXAMPLE PROJECT (From Section F)NUMBER 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in "Example Projects Key" section below before completing table. Place "X" under project key number for participation in same or similar role.) Oscar J. Cruz, P.E.Senior Structural Engineer X X X XJorge A. Canales, P.E.Senior Structural Engineer G-72E Control Structure, Hialeah Gardens, Florida Hard Rock Stadium Pedestrian Bridges and Tunnels, Miami Gardens, Florida XGregory P. Dover, P.E.Senior Structural Engineer X X X MacArthur Causeway East Bridge Repairs, Miami, Florida FDOT District 6 Professional Engineering Design Consulting Services Districtwide, Miami, Florida X 311 & 911 Support Area Renovation, Doral, Florida X X X 173 H. ADDITIONAL INFORMATION 30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED. I. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. 31. SIGNATURE 32. DATE 33. NAME AND TITLE STANDARD FORM 330 (REV. 8/2016) PAGE 5 Chrome Engineering, Inc., was founded in 2018 as a local engineering company with the objective to provide civil and structural design consulting services for the multiple ongoing and planed projects within our area. We are prequalified to provide structural engineering services with the Florida Department of Transportation and Miami-Dade County. We are also listed as an FDOT disadvantaged business enterprise (DBE) with the State of Florida and Small Business Enterprise (SBE) with Miami-Dade County. the following is a list of our structural engineering services experience: a. Pedestrian and Highway Bridges (New, Widening and Rehabilitations including PD&E projects) b. Seawalls, Retaining Walls and Bulkhead Walls c. Water Control Structures d. Pump Stations structural analysis e. Signal Mast Arms (Standard and Decorative) f. Structural Inspections (Buildings/Educational Facilities and Bridges) g. ITS Structures (DMS, ADMS, CCTV poles, Tolling) h. Decorative Light poles (Including solar power alternatives) i. Bus Shelters & Pedestrian Canopies j. Storage Tanks k. Concrete Box Culverts l. Pipe Culverts (Steel and Corrugated Aluminum) m. Safety Bollards n. Sign Structures (Standard and Decorative) o. Structural Inspections (Buildings/Educational Facilities and Bridges) p. Services during Construction: Shop Drawing Reviews & RFI’s q. Specialty Engineering Services r. Constructability Reviews, Cost Estimation and Value Engineering assignments. Chrome Engineering’s structural staff has participated in dozens of local, national and international civil engineering projects and has developed vast expertise, not only in structural design, but also in the preparation of renderings and 3-d models to ensure that the client vision for projects is clearly expressed in the design documents. We have prepared construction cost estimates that accurately reflect the final costs for multiple projects. Our Team’s experience includes taking structural design plans thru construction within schedule and budget. Our combined staff experience includes projects for all FDOT Districts including the Turnpike, as well as MDX, Miami-Dade County, Broward County, Collier County, Pinellas County, City of Doral, City of Miami Gardens and City of Hialeah among many others. Chrome Engineering, Inc., has continued to work during these difficult times and has all the necessary tools to communicate remotely, via secured applications such as Microsoft Teams. We utilize file sharing applications such as Microsoft OneDrive and Projectwise, to make sure we are all working with the most recent version of project information. Oscar J. Cruz, P.E., President 08/11/2020 174 PART II - GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) a. SIGNATURE ARCHITECT-ENGINEER QUALIFICATIONS 2a. FIRM (or Branch Office) NAME 2b. STREET 2c. CITY 2d. STATE 2e. ZIP CODE 3. YEAR ESTABLISHED 4. UNIQUE ENTITY IDENTIFIER 5. OWNERSHIP b. Discipline c. Number of Employees 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS b. Experience c. Revenue Index Number (see below) STANDARD FORM 330 (REV. 8/2016) PAGE 6 1. SOLICITATION NUMBER (If any) 8a. FORMER FIRM NAME(S) (If any)8b. YEAR ESTABLISHED 9. EMPLOYEES BY DISCIPLINE Total (1) FIRM (2) BRANCH 1. Less than $100,000 2. $100,000 to less than $250,000 3. $250,000 to less than $500,000 4. $500,000 to less than $1 million 5. $1 million to less than $2 million 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) 7. NAME OF FIRM (If Block 2a is a Branch Office) 6a. POINT OF CONTACT NAME AND TITLE 6c. E-MAIL ADDRESS 8c. UNIQUE ENTITY IDENTIFIER a. Federal Work b. Non-Federal Work c. Total Work 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. b. DATE c. NAME AND TITLE a. Function Code a. Profile Code 6b. TELEPHONE NUMBER a. TYPE b. SMALL BUSINESS STATUS PROFESSIONAL SERVICES REVENUE INDEX NUMBER 6. $2 million to less than $5 million 7. $5 million to less than $10 million 8. $10 million to less than $25 million 9. $25 million to less than $50 million 10. $50 million or greater Other Employees Chrome Engineering, Inc. 16650 N. Kendall Drive, Suite 205 Miami FL 33196 Oscar J. Cruz, P.E., President (305) 432-6826 ocruz@chromeeng.com RFQ No. 20-07-01 2018 Corporation FDOT SBE and DBE, MDC SBE 57 Structural Engineer B02 Rehabilitation (Buildings; Structures; Facilites) Structural Design; Special Structures Bridges Tunnels & SubwaysT06 R06 S09 3 4 08 CADD Technician 2 2 2 2 3 1 2 2 Oscar J. Cruz, P.E., President 08/11/2020 087465862 175 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)176 177 178 179 180 181 182 183 184 185 186 187 188 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)189 STANDARD FORM 330 (REV. 8/2016) ARCHITECT - ENGINEER QUALIFICATIONS PART I - CONTRACT-SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1. TITLE AND LOCATION (City and State) Continuing Professional Consulting Services (CCNA) – The City of Sunny Isles Beach 2. PUBLIC NOTICE DATE 3. SOLICITATION OR PROJECT NUMBER 20-07-01 B. ARCHITECT-ENGINEER POINT OF CONTACT 4. NAME AND TITLE Raj Krishnasamy, P.E., President/ Principal Engineer 5. NAME OF FIRM TIERRA SOUTH FLORIDA, Inc. (TSF) 6. TELEPHONE NUMBER (561) 687-8536 7. FAX NUMBER (561) 687-8570 8. E-MAIL ADDRESS Raj@TSFGeo.com C. PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors.) (Check) 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT PRIME J-V PARTNER SUBCON-TRACTOR a. X CHECK IF BRANCH OFFICE 2765 Vista Parkway, Suite 10 West Palm Beach, FL 33411 Geotechnical Engineering b. CHECK IF BRANCH OFFICE c. CHECK IF BRANCH OFFICE d. CHECK IF BRANCH OFFICE D. ORGANIZATIONAL CHART OF PROPOSED TEAM (Attached) 190 STANDARD FORM 330 (REV. 8/2016) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Raj Krishnasamy, P.E. 13. ROLE IN THIS CONTRACT Principal-in-Charge, Principal Engineer 14. YEARS EXPERIENCE a. TOTAL 33 b. WITH CURRENT FIRM 20 15. FIRM NAME AND LOCATION (City and State) TIERRA SOUTH FLORIDA, INC. (TSF) West Palm Beach, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) BS Civil Engineering, Christian Brothers University, 1987 MS Civil Engineering, University of Memphis, 1996 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Engineer, Florida No. 53567 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) American Society of Highway Engineers, Past President, Florida Engineering Society, Past Treasurer Geotechnical Material Engineering Council, Past Chairman 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Gateway Park Pedestrian Bridge, City of Sunny Isles Beach, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2014 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Krishnasamy was the Principal-in-Charge of the Geotechnical Engineering Services for the Gateway Park Pedestrian Bridge located in The City of Sunny Isles, Florida. The project consists of the construction of a new pedestrian bridge over State Road No. 826 Westbound. The purpose of this study was to explore the subsurface conditions within or in close proximity to the pedestrian bridge to enable an evaluation of foundations for the construction. Provided a geotechnical engineering report including geotechnical evaluations and recommendations regarding foundation, bridge, pile monitoring and construction considerations regarding excavations. Completed on time and within budget. b. (1) TITLE AND LOCATION (City and State) Samson Oceanfront Park, City of Sunny Isles Beach, Florida. (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2016 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Krishnasamy was the Principal-in-Charge of the Auger-Cast Pile Inspection and Construction Material Testing Services for the Samson Oceanfront Park located in the City of Sunny Isles Beach, Florida. The project consists of a compact beach park with a playground, pavilion and showers. A TSF Senior Engineer provided review of daily reports, handled project coordination and attended meetings as necessary. Completed on time and within project. c. (1) TITLE AND LOCATION (City and State) SW 42 Street (Bird Road Extension) From SW 162 Avenue to SW 157 Avenue, Miami-Dade County, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Krishnasamy was the Principal-in-Charge of the Geotechnical Engineering Services for the widening project of Bird Road Extension from SW 162nd Ave to SW 15th Avenue in Miami-Dade County. The roadway limits are approximately 3,100 lineal feet in length. Provided a geotechnical engineering report including geotechnical evaluations and recommendations regarding permanent cut and fill slopes, excavations, groundwater control, pavement design considerations, and on-site suitability. Completed on time and within budget. d. (1) TITLE AND LOCATION (City and State) Biscayne National Park, Convoy Point/Adams Key, Biscayne Keys, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Krishnasamy was the Principal-in-Charge of the Geotechnical Engineering Study for the Biscayne National Park located in the Biscayne Keys, Florida. The project consists of design repairs and replacements that address the hurricane impact damage caused by Hurricane Irma and Maria. The study was performed to obtain information on the existing subsurface conditions within the site improvements to assist in the design and preparation of construction plans. Provided a geotechnical engineering report including the results of the subsurface exploration. Completed on time and within budget. e. (1) TITLE AND LOCATION (City and State) Vista Verde Phase 4, Roadway and Drainage Improvement, City of Miami Gardens, Florida. (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Krishnasamy was the Principal-in-Charge of the Geotechnical Engineering Services for the Vista Verde Phase 4 located in the City of Miami Gardens, Florida. The project consists of roadway and drainage improvements, and pavement design. The purpose of this study was to explore the subsurface conditions at the site to enable an evaluation of acceptable construction and site development considerations. Provided a geotechnical engineering report including geotechnical evaluation and recommendations regarding excavations, trench backfill, and preconstruction conditions survey. Completed on time and within budget. 191 STANDARD FORM 330 (REV. 8/2016) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Kumar Vedula, P.E. 13. ROLE IN THIS CONTRACT Principal Geotechnical Engineer 14. YEARS EXPERIENCE a. TOTAL 24 b. WITH CURRENT FIRM 14 15. FIRM NAME AND LOCATION (City and State) TIERRA SOUTH FLORIDA, INC. (TSF) West Palm Beach, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) Bachelor of Engineering, Andhra University, India, 1992 MS Civil Engineering, University of Memphis, 1995 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Engineer, Florida No. 54873 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Augered Cast-in-Place and Driven Pre-stressed Concrete Pile Field Performance Comparison, Frizzi, R. P, & Vedula, R.V, Published in FHWA Resource Center, 83rd Annual Transportation Research Board Meeting, Washington D.C., January 2004 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Biscayne National Park, Convoy Point/Adams Key, Biscayne Keys, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Vedula was the Principal Geotechnical Engineer of the Geotechnical Engineering Study for the Biscayne National Park located in the Biscayne Keys, Florida. The project consists of design repairs and replacements that address the hurricane impact damage caused by Hurricane Irma and Maria. Provided a geotechnical engineering report including the results of the subsurface exploration. b. (1) TITLE AND LOCATION (City and State) Prospect NE 10th Avenue Bridge, Miami-Dade County, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Vedula was the Principal Geotechnical Engineer of the Geotechnical Engineering Services for the Prospect NE 10th Avenue Bridge located in Miami-Dade County, Florida. The bridge will be replaced with a wider typical section to accommodate increased pedestrian and vehicular traffic. Provided a preliminary geotechnical engineering report including engineering evaluations and preliminary recommendations regarding driven concrete pile axial capacity, drilled shaft axial capacity, construction considerations, and monitor existing structures. Completed on time and within budget. c. (1) TITLE AND LOCATION (City and State) Vista Verde Phase 4, Roadway and Drainage Improvement, City of Miami Gardens, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Vedula was the Principal Geotechnical Engineer of the Geotechnical Engineering Services for the Vista Verde Phase 4 located in the City of Miami Gardens, Florida. The project consists of roadway and drainage improvements, and pavement design. The purpose of this study was to explore the subsurface conditions at the site to enable an evaluation of acceptable construction and site development considerations. Provided a geotechnical engineering report including geotechnical evaluation and recommendations regarding excavations, trench backfill, and preconstruction conditions survey. Completed on time and within budget. d. (1) TITLE AND LOCATION (City and State) SW 42 Street (Bird Road Extension) From SW 162 Avenue to SW 157 Avenue, Miami-Dade County, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Vedula was the Geotechnical Principle Engineer of the Geotechnical Engineering Services for the widening project of Bird Road Extension from SW 162nd Ave to SW 15th Avenue in Miami-Dade County. The roadway limits are approximately 3,100 lineal feet in length. Provided a geotechnical engineering report including geotechnical evaluations and recommendations regarding permanent cut and fill slopes, excavations, groundwater control, pavement design considerations, and on-site suitability. Completed on time and within budget. e. (1) TITLE AND LOCATION (City and State) NW 107th Ave from 58th to NW 74th St., Doral, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Vedula was the Principal Geotechnical Engineer of the Geotechnical Engineering Services for the for NW 107th Avenue from 58th Northwest 74th Street located in Doral, Florida. Provided a geotechnical engineering report including the results of field testing for consideration of potential issues regarding subsidence. Completed on time and within budget. 192 STANDARD FORM 330 (REV. 8/2016) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Francois Thomas, P.E. 13. ROLE IN THIS CONTRACT Principal Engineer, Special Inspector 14. YEARS EXPERIENCE a. TOTAL 27 b. WITH CURRENT FIRM 18 15. FIRM NAME AND LOCATION (City and State) TIERRA SOUTH FLORIDA, INC. (TSF) West Palm Beach, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) MS in Geotechnical Engineering, 1993; BS in Civil Engineering, 1991 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Engineer, Florida No. 56381 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Special Inspector 7021399, Certified Masonry Inspector, Radiation Safety Officer 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Gateway Park Pedestrian Bridge, City of Sunny Isles Beach, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2014 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Thomas was the Principal Engineer of the Geotechnical Engineering Services for the Gateway Park Pedestrian Bridge located in The City of Sunny Isles, Florida. The project consists of the construction of a new pedestrian bridge over State Road No. 826 Westbound. The purpose of this study was to explore the subsurface conditions within or in close proximity to the pedestrian bridge to enable an evaluation of foundations for the construction. TSF’s geotechnical field study included SPT borings. Provided a geotechnical engineering report including geotechnical evaluations and recommendations regarding foundation, bridge, pile monitoring and construction considerations regarding excavations. Completed on time and within budget. b. (1) TITLE AND LOCATION (City and State) Samson Oceanfront Park, City of Sunny Isles Beach, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Thomas was the Principal Engineer of the Auger-Cast Pile Inspection and Construction Material Testing Services for the Samson Oceanfront Park located in the City of Sunny Isles Beach, Florida. The project consists of a compact beach park with a playground, pavilion and showers. A TSF Senior Engineer provided review of daily reports, handled project coordination and attended meetings as necessary. Completed on within budget. c. (1) TITLE AND LOCATION (City and State) Cultural Pavilion at Triangle Park, City of Doral, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Thomas was the Principal Engineer of the Geotechnical Engineering Study for the Cultural Pavilion at Triangle Park. The project consists of a single-story cultural pavilion encompassing an area of approximately 9,200 square feet, walkways and associated site work. The purpose of this study was to explore the subsurface conditions at the site to enable an evaluation of acceptable foundation and pavement systems for the construction. Provided a geotechnical engineering report including geotechnical recommendations regarding, site preparation, foundations, floor slab, utilities, and construction considerations regarding excavations. Completed on time and within budget. d. (1) TITLE AND LOCATION (City and State) Miami-Dade Transfer Station Conceptual Study, Homestead, Florida. (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Thomas was the Principal Engineer of the Geotechnical Engineering Study for the Miami-Dade Transfer Station located in Homestead, Florida. The project consists of a single-story Transfer Station Building, with wall heights in excess of 45 feet. The purpose of this study was to explore the subsurface conditions at the site to enable a preliminary evaluation of an acceptable foundation for the construction. Provided a geotechnical engineering report including geotechnical evaluations and preliminary discussions regarding floor slab and utilities. Completed on time and within budget. e. (1) TITLE AND LOCATION (City and State) Vista Verde Phase 4, Roadway and Drainage Improvement, City of Miami Gardens, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Thomas was the Principal Engineer of the Geotechnical Engineering Services for the Vista Verde Phase 4 located in the City of Miami Gardens, Florida. The project consists of roadway and drainage improvements, and pavement design. The purpose of this study was to explore the subsurface conditions at the site to enable an evaluation of acceptable construction and site development considerations. Provided a geotechnical engineering report including geotechnical evaluation and recommendations regarding excavations, trench backfill, and preconstruction conditions survey. Completed on time and within budget. 193 STANDARD FORM 330 (REV. 8/2016) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 1 21. TITLE AND LOCATION (City and State) Gateway Park Pedestrian Bridge, City of Sunny Isles Beach, Florida. 22. YEAR COMPLETED PROFESSIONAL SERVICES 2014 CONSTRUCTION (If applicable) 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER City of Sunny Isles Beach c/o RJ Behar & Company, Inc. b. POINT OF CONTACT NAME Mr. Juan Vazquez c. POINT OF CONTACT TELEPHONE NUMBER (954) 680-7771 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) TSF provided Geotechnical Engineering Services for the Gateway Park Pedestrian Bridge located in The City of Sunny Isles, Florida. The project consists of the construction of a new pedestrian bridge over State Road No. 826 Westbound. The purpose of this study was to explore the subsurface conditions within or in close proximity to the pedestrian bridge to enable an evaluation of foundations for the construction. TSF’s geotechnical field study included SPT borings. Provided a geotechnical engineering report including geotechnical evaluations and recommendations regarding foundation, bridge, pile monitoring and construction considerations regarding excavations. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME TSF (2) FIRM LOCATION (City and State) West Palm Beach, FL (3) ROLE Geotechnical Engineering Services 194 STANDARD FORM 330 (REV. 8/2016) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 2 21. TITLE AND LOCATION (City and State) Biscayne National Park, Convoy Point/Adams Key, Biscayne Keys, Florida. 22. YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER Miami-Dade County Parks, Recreation and Open Spaces c/o Jacobs b. POINT OF CONTACT NAME Ms. Rita Donnell c. POINT OF CONTACT TELEPHONE NUMBER (720) 286-1572 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) TSF performed a Geotechnical Engineering Study for the Biscayne National Park located in the Biscayne Keys, Florida. The project consists of design repairs and replacements that address the hurricane impact damage caused by Hurricane Irma and Maria. The study was performed to obtain information on the existing subsurface conditions within the site improvements to assist in the design and preparation of construction plans. TSF’s geotechnical field study included SPT borings; Classified soil samples in the laboratory using the Unified Soil Classification System. Provided a geotechnical engineering report including the results of the subsurface exploration. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME TSF (2) FIRM LOCATION (City and State) West Palm Beach, FL (3) ROLE Geotechnical Engineering Services 195 STANDARD FORM 330 (REV. 8/2016) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 3 21. TITLE AND LOCATION (City and State) Vista Verde Phase 4, Roadway and Drainage Improvement, City of Miami Gardens, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER City of Miami Gardens c/o Craven Thompson & Associates, Inc. b. POINT OF CONTACT NAME Mr. Gary Tenn c. POINT OF CONTACT TELEPHONE NUMBER (954)-739-6400 x306 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) TSF provided Geotechnical Engineering Services for the Vista Verde Phase 4 located in the City of Miami Gardens, Florida. The project consists of roadway and drainage improvements, and pavement design. The purpose of this study was to explore the subsurface conditions at the site to enable an evaluation of acceptable construction and site development considerations. TSF’s geotechnical field study included auger borings, pavement cores and borehole permeability tests. Provided a geotechnical engineering report including geotechnical evaluation and recommendations regarding excavations, trench backfill, and preconstruction conditions survey. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME TSF (2) FIRM LOCATION (City and State) West Palm Beach, FL (3) ROLE Geotechnical Engineering Services 196 STANDARD FORM 330 (REV. 8/2016) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 4 21. TITLE AND LOCATION (City and State) Wastewater Pump Station Improvements / Hispanola Ave at Mutiny Ave and Galleon St at E Treasure Dr, North Bay Village, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER Miami-Dade County c/o Kimley-Horn b. POINT OF CONTACT NAME Ms. Marissa Maring, P.E. c. POINT OF CONTACT TELEPHONE NUMBER / EMAIL (954) 535 5137 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) TSF performed a Geotechnical Engineering Study for the North Bay Village Lift Stations located in North Bay Village, Florida. The project consists of a Lift Stations in the intersection of Hispanola Avenue and Mutiny Avenue and in the intersection of Galleon Street and E Treasure Drive. TSF’s geotechnical field study included SPT borings. Provided a geotechnical engineering report including geotechnical evaluations and recommendations regarding foundations, wet wall foundations, valve vault foundations, utilities, excavations and dewatering, lateral Earth Pressures, and preconstruction conditions survey. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME TSF (2) FIRM LOCATION (City and State) West Palm Beach, FL (3) ROLE Geotechnical Engineering Services 197 STANDARD FORM 330 (REV. 8/2016) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 5 21. TITLE AND LOCATION (City and State) SW 42 Street (Bird Road Extension) From SW 162 Avenue to SW 157 Avenue, Miami-Dade County, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER Miami- Dade Public Works and Waste Management c/o David Plummer & Associates, Inc. b. POINT OF CONTACT NAME Mr. Victor Lee c. POINT OF CONTACT TELEPHONE NUMBER (305)-447-0900 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) TSF provided Geotechnical Engineering Services for the widening project of Bird Road Extension from SW 162nd Ave to SW 15th Avenue in Miami-Dade County. The roadway limits are approximately 3,100 lineal feet in length. The study was performed to obtain information on the existing subsurface conditions along the project alignment to assist in the design and preparation of construction plans for improvements. TSF’s geotechnical field study included SPT borings. Provided a geotechnical engineering report including geotechnical evaluations and recommendations regarding permanent cut and fill slopes, excavations, groundwater control, pavement design considerations, and on-site suitability. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME TSF (2) FIRM LOCATION (City and State) West Palm Beach, FL (3) ROLE Geotechnical Engineering Services 198 STANDARD FORM 330 (REV. 8/2016) G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 26. NAMES OF KEY PERSONNEL (From Section E, Block 12) 27. ROLE IN THIS CONTRACT (From Section E, Block 13) 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in "Example Projects Key" section below before completing table. Place "X" under project key number for participation in same or similar role.) 1 2 3 4 5 6 7 8 9 10 Raj Krishnasamy, P.E. Principal-in-Charge, Principal Engineer X X X X X Kumar Vedula, P.E. Principal Engineer X X X X Francois Thomas, PE Principal Engineer X X X X X 29. EXAMPLE PROJECTS KEY NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) 1 Gateway Park Pedestrian Bridge, City of Sunny Isles Beach, Florida 6 2 Biscayne National Park, Convoy Point/Adams Key, Biscayne Keys, Florida 7 3 Vista Verde Phase 4, Roadway and Drainage Improvement, City of Miami Gardens, Florida 8 4 Wastewater Pump Station Improvements / Hispanola Ave at Mutiny Ave and Galleon St at E Treasure Dr, North Bay Village, FL 9 5 SW 42 Street (Bird Road Extension) From SW 162 Avenue to SW 157 Avenue, Miami-Dade County, Florida 10 199 200 201 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)202 (Complete this section for the prime contractor and all key subcontractors.) STANDARD FORM 330 ARCHITECT - ENGINEER QUALIFICATIONS PART I - CONTRACT-SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION B. ARCHITECT-ENGINEER POINT OF CONTACT D. ORGANIZATIONAL CHART OF PROPOSED TEAM C. PROPOSED TEAM 9. FIRM NAME (Check)PRIMEJ-V PARTNERSUB-CONSULTANT11. ROLE IN THIS CONTRACT 1. TITLE AND LOCATION (City and State) 2. PUBLIC NOTICE DATE 4. NAME AND TITLE 5. NAME OF FIRM 6. TELEPHONE NUMBER 7. FAX NUMBER 8. E-MAIL ADDRESS 3. SOLICITATION OR PROJECT NUMBER CHECK IF BRANCH OFFICE CHECK IF BRANCH OFFICE CHECK IF BRANCH OFFICE CHECK IF BRANCH OFFICE CHECK IF BRANCH OFFICE CHECK IF BRANCH OFFICE (ATTACHED) 10. ADDRESS a. b. c. d. e. f. STANDARD FORM 330 (REV. 8/2016) - SF330-A ThRu C_uSuPAE Continuing Professional Consulting Services (CCNA) July 8, 2020 Charles “Chuck” R. Faust, Jr. uS utility Potholing & Air Excavation 954.937.1488 954.921.1149 CFaust@uSutilityPotholing.com 20-07-01 Managing Member Calvin, Giordano & Associates, Inc.X 1800 Eller Drive, Suite 600 Fort Lauderdale, FL 33316 PRIME CONSuLTANT: Landscape Architecture, Urban Design, Planning, Environmental Services, Civil Engineering, Traffic Engineering, Surveying uS utility Potholing & Air Excavation (uSuPAE)X 4630 NE 11th Avenue Oakland Park, FL 33334 SuB-CONSuLTANT: Utility Designation / Utility Potholing SUE 203 c. d. e. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete One Section E for Each Key Person.) 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE 19. RELEVANT PROJECTS a. b. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 ChARleS FAuST CHARLES “CHUCK” R. FAUST JR. uS utility Potholing & Air excavation high School Diploma N/A Oakland Park, FL Utility Locating Certificate ACCOUNT MANAGEMENT 5 5 14-7216.2 Nova Drive Improvements Davie, Florida Collected SUE Data for the purpose of verifying underground utilities horizontal and vertical locations for Nova Dr widening. Our cost $ 34,110.00 2017 N/A FDOT I-95 expressway Broward County, Florida Collected SUE Data for the purpose of verifying utility locations for future foundations of widening I-95 in Broward County. Our cost $18,970.00. 2016 N/A Dania Beach Catch Basin 5 Dania Beach, Florida Collected SUE Data for engineering design purposes for Calvin Giordano & Associates our cost $11,955.00. 2015 N/A Mount Sinai hospital Miami Beach, Florida Collected SUE Data for design purposes for Kimley-Horn Engineering for raising structures and new construction at Mount Sinai Hospital in Miami our cost $17,855.00 2015 N/A FDOT 826 / I-75 expressway lanes Florida Collected SUE Data for the purposes of verifying locations of underground utilities for placement of mast arm bases. This is an ongoing contract as needed. 2016 N/A 204 c. d. e. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete One Section E for Each Key Person.) 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE 19. RELEVANT PROJECTS a. b. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330JuAN RiveRA JUAN RIVERA uS utility Potholing & Air excavation High School McArthur N/A McFatter Technical institute - Davie, Florida Oakland Park, FL Hollywood, Florida OSHA 10 Hour Large Diameter Pipe Cleaning & Flagging Certificate SUE TECHNICIAN 2 2 uS utility Potholing & Air excavation Oakland Park, Florida SUE Technician: Expose utilities, Vack / Component fill, potholing, catch basin cleaning, storm drain cleaning. 06/2018-Ongoing 205 c. d. e. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete One Section E for Each Key Person.) 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE 19. RELEVANT PROJECTS a. b. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 MARviN PARkiNS MARVIN PARKINS US Utility Potholing & Air Excavation knockalya High School, Jamaica N/A Oakland Park, FL June 2003 Permit to work within 20 - 25 feet of train tracks. MOT certified. Licensed contract for schools in Broward and Miami-Dade. SUE TECHNICIAN 10 <1 US Utility Potholing & Air Excavation Oakland Park, Florida SUE Technician: Utility Locator, identifying and labeling public utility mains that are underground. 06/2020-Ongoing Cardno TBE Fort Lauderdale, Florida SUE Technician: Worked as main lead on Vac truck, completing soft digs and designating. Also FDOT qualified. 11/2010-09/2014 keith and Associates, inc. Fort Lauderdale, Florida Designator: Experienced underground utility locator using equipment such as GPR-GSSI, RD 8000 and VIVAX utility scanner. Provided thorough sketches after designating was complete. MOT certified. Main lead on vac truck in soft digs. Able to take lead initiative. Excellent problem solving skills in locating underground utilities. 11/2014-03/2018 infraMap West Palm Beach, Florida Designator: Lead designator in field. Used GPR, RD 8100,VIVAX and A10 to locate underground utilities. Provided detail sketches to clients of designated area. Able to proficiently set up MOT. 04/2018-05/2020 206 c. d. e. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete One Section E for Each Key Person.) 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE 19. RELEVANT PROJECTS a. b. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firm (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firm (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firm (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firm (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 Mike MuRphy MICHAEL MURPHY uS utility potholing & Air excavation Associates Degree N/A Oakland Park, FL Broward College, Fort Lauderdale, FL SUE TECH I 3 months 3 months uS utilty potholing and Air excavation Oakland Park, Florida SUE 1 - Vac truck labor. Expose utilities, vack / compound fill, potholing, catch basin cleaning. 03/2020 N/A 207 c. d. e. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete One Section E for Each Key Person.) 12. NAME 16. EDUCATION (Degree and Specialization) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 15. FIRM NAME AND LOCATION (City and State) 13. ROLE IN THIS CONTRACT a. TOTAL b. WITH CURRENT FIRM 14. YEARS OF EXPERIENCE 19. RELEVANT PROJECTS a. b. (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firm (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firm (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX (1) TITLE AND LOCATION (City and State) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED Check if project performed with current firmX STANDARD FORM 330 (REV. 8/2016) - SF330 AAgje MONTeleONe AAGIE MONTELEONE US Utility Potholing & Air excavation Associates Degree Hospitality N/A Oakland Park, FL Palm Beach Community College, Palm Beach, FL OFFICE ADVISORY 20+1+ US Utilty Potholing and Air excavation Oakland Park, Florida Office Manager - Complete construction reports, follow up with any pending issues/concerns, handle invoices/accounting. Make sure any plans are approved and ready to go. Create tickets for any jobs. Organize files, jobs and customer services emails. 2018 N/A Surf Industry Brands Customer Service Associate Office Manager - Managed the office dealing with order entry, problem solving with orders, billing, ect. Organized trade shows and appointments . 2008-2018 N/A embassy Suites by Hilton Deerfiled Beach Resort Deerfield Beach, Florida Front Office Manager 1997-2008 N/A 208 20. EXAMPLE PROJECT KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETED 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE a. b. c. d. e. STANDARD FORM 330 (REV. 8/2016) - SF330-F - USUPAE_PROjEcTS 2016 N/A 01 cOMMUNITY, cONDOTTE, DE MOYA US Utility Potholing & Air Excavation Oakland Park, FL Subsurface Utility Engineering FDOT 826 / I-75 Expressway Lanes Antonio Diaz 786.543.7166 Florida US Utility Potholing & Air Excavation was requested to locate mark and physically verify existing utilities that may be of conflict with proposed mast arms. We verified the utilities with the use of vacuum excavation methods and depths measured with grade rod. Our crews collected data and marked with either PK Nails and Paint or Stake and Feather for the survey crews to shoot. This is an ongoing contract and work as needed by client. 209 20. EXAMPLE PROJECT KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETED 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE a. b. c. d. e. STANDARD FORM 330 (REV. 8/2016) - SF330-F - USUPAE_PROjEcTS 2016 N/A 02 FDOT US Utility Potholing & Air Excavation Oakland Park, FL Subsurface Utility Engineering FDOT I-95 Expressway Abraham Hadad 305.207.6845 Broward County, Florida US Utility Potholing & Air Excavation was responsible for collecting SUE Data to aid in the design and installation for future foundations for the widening of I-95 Expressway. We were requested to locate mark and physically verify existing utilities that may be in conflict with proposed foundations on the widening of I-95 Expressway Overpasses. Requested utilities were verified with the use of vacuum excavation methods and depths measured with grade rod. Our crews collected data and marked with either PK Nails and Paint or Stake and Feather along with providing the Surveying Firm of Hadonne a detailed report of utilities located. Cost of our services on this project were $18,970.00 210 20. EXAMPLE PROJECT KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETED 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE a. b. c. d. e. STANDARD FORM 330 (REV. 8/2016) - SF330-F - USUPAE_PROjEcTS N/A N/A 03 cITY OF DANIA BEAcH US Utility Potholing & Air Excavation Oakland Park, FL Subsurface Utility Engineering Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime: Engineering Design Dania Beach catch Basin 5 james Messick, PE 954.766.2789 Dania Beach, Florida Calvin, Giordano & Associates, Inc. - Project Manager We were asked by client to collect SUE Data on potential conflicts of existing utilities for the design of Catch Basins in Dania Beach, FL. We located, measured depth and size of existing utilities by the use of standard utility locating methods, GPR and Vacuum Excavation methods. We then compiled the data into a detailed SUE Report along with marking on pavement or grass with PK Nails, Paint or Stake/ Feathers for future survey. 211 20. EXAMPLE PROJECT KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETED 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE a. b. c. d. e. STANDARD FORM 330 (REV. 8/2016) - SF330-F - USUPAE_PROjEcTS N/A N/A 04 BROWARD cOUNTY US Utility Potholing & Air Excavation Oakland Park, FL Subsurface Utility Engineering Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Engineering 14-7216.2 Nova Drive Improvements jenna Martinetti, PE 954.921.7781 Davie, Florida Calvin, Giordano & Associates, Inc. - Project Manager Verification of existing utilities for street widening on Nova Dr and also clearing utilities for future mast arms. Total cost of our services $34,110.00 212 20. EXAMPLE PROJECT KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETED 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE a. b. c. d. e. STANDARD FORM 330 (REV. 8/2016) - SF330-F - USUPAE_PROjEcTS N/A N/A 05 FLORIDA INTERNATIONAL UNIVERSITY US Utility Potholing & Air Excavation Oakland Park, FL Subsurface Utility Engineering FIU Miami campus Marty Rossi 954.436.7000 Miami, Florida Miller Legg - Project Manager Provided utility verification on specific utilities that client had designated to aid in design purposes. Our fees on this project were $4310.00. 213 20. EXAMPLE PROJECT KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETED 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE a. b. c. d. e. STANDARD FORM 330 (REV. 8/2016) - SF330-F - USUPAE_PROjEcTS N/A N/A 06 cVS US Utility Potholing & Air Excavation Oakland Park, FL Subsurface Utility Engineering cVS #74943 john Hillman 561.404.7238 Florida Kimley-Horn - Project Manager Client asked us to go to new site of CVS to locate and verify existing utilities to aid in the design of new CVS Store location. We located utilities through standard utility locating methods and GPR and verification was performed with the use of Vacuum Excavation. Total cost of our services on this project was $2,975.00. 214 20. EXAMPLE PROJECT KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETED 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE a. b. c. d. e. STANDARD FORM 330 (REV. 8/2016) - SF330-F - USUPAE_PROjEcTS N/A N/A 07 FDOT US Utility Potholing & Air Excavation Oakland Park, FL Subsurface Utility Engineering Utility Locate / Verification craig Fusaro 727.479.6338 Bal Harbor, Florida GeoView - Project Manager This was a small project to locate using air vacuum excavation methods existing utilities in the area where a new mast arm would be installed for a traffic light. We were hired by the utility locating company GeoView. Project Cost $1,000.00 215 20. EXAMPLE PROJECT KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 22. YEAR COMPLETED 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE a. b. c. d. e. STANDARD FORM 330 (REV. 8/2016) - SF330-F - USUPAE_PROjEcTS N/A N/A 08 STATE cONTRAcTING & ENGINEERING US Utility Potholing & Air Excavation Oakland Park, FL Subsurface Utility Engineering Pine Avenue Drain Improvements Paul carty 954.931.3857 Lauderdale-by-the-Sea, Florida To verify and mark the elevation of existing utilities with the use of Air Vacuum Excavation methods. Utilities were all marked using paint. 216 G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 26. NAMES OF KEY PERSONNEL (From Section E, Block 12) 29. EXAMPLE PROJECTS KEY NO. 1 2 3 4 5 NO. 6 7 8 9 10 TITLE OF EXAMPLE PROJECT (From Section F)TITLE OF EXAMPLE PROJECT (From Section F) 27. ROLE IN THIS CONTRACT (From Section E, Block 13) 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in “Example Projects Key” section below before completing table. Place “X” under project key number for participation in same or similar role.) 1 2 3 4 5 6 7 8 9 10 STANDARD FORM 330 (REV. 8/2016) - SF330-G_USUPAE XAccount Management/Field WorkCharles R. Faust Jr.X X X X X X X SUE TechnicianJuan Rivera X X X SUE TechnicianMarvin Parkins SUE Technician IMichael Murphy Aagie Monteleone FDOT 826 / I-75 Expressway Lanes CVS #74943 FDOT I-95 Expressway Utility Locate / Verification Dania Beach Catch Basin 5 Pine Avenue Drain Improvements 14-7216.2 Nova Drive Improvements FIU Miami Campus 217 H. ADDITIONAL INFORMATION I. AUTHORIZED REPRESENTATIVE The forgoing is a statement of facts. STANDARD FORM 330 (REV. 8/2016) - SF330-H_USUPAE 30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED. 31. SIGNATURE 33. NAME AND TITLE 32. DATE Charles R. Faust Jr.Managing Member 06.05.2020 218 ARCHITECT - ENGINEER QUALIFICATIONS PART II - GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 3. YEAR ESTABLISHED a. TYPE b. SMALL BUSINESS STATUS 7. NAME OF FIRM (If Block 2a is a Branch Office) 6b. TELEPHONE NUMBER Other Employees a. Federal Work a. SIGNATURE b.DATE c. NAME AND TITLE 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. PROFESSIONAL SERVICES REVENUE INDEX NUMBER 1. Less than $100,000 2. $100,000 to less than $250,000 3. $250,000 to less than $500,000 4. $500,000 to less than $1 million 5. $1 million to less than $2 million 6. $2 million to less than $5 million 7. $3 million to less than $10 million 8. $10 million to less than $25 million 9. $25 million to less than $50 million 10. $50 million or greater b. Non-Federal Work c. Total Work Total 6a. POINT OF CONTACT NAME AND TITLE 2c. CITY 2b. STREET 2a. FIRM (or Branch OFfice) NAME 2d. STATE 2e. ZIP CODE 6c. E-MAIL ADDRESS 4. UNIQUE ENTITY IDENTIFIER 5. OWNERSHIP 8b. YEAR ESTABLISHED8a. FORMER FIRM NAME(S) (If any) 10. PROFILE OF FIRM’S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS9. EMPLOYEES DISCIPLINE a. Function Code b. Discipline a. Profile Code c. Number of Employees (1) FIRM (2) BRANCH c. Revenue Index Number (see below) b. Experience 8c. UNIQUE ENTITY IDENTIFIER STANDARD FORM 330 (REV. 8/2016) - SF330-PART II_USUPAE 2014 CORPORATION BROWARD COUNTY SMALL BUSINESS FLORIDA US UTILITY POTHOLING & AIR EXCAVATION 4630 NE 11TH AVENUE OAKLAND PARK 33334 85-9310166 954.937.1488 02 1 25AdministrativeConstruction Management 20Cost Estimating 0 8 8 CFaust@USUtilityPotholing.com CHARLES R. FAUST JR.MANAGING MEMBER June 5, 2020 CHUCK FAUST MANAGING MEMBER 1. SOLICITATION NUMBER (If any) 20-07-01 219 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)220 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)221 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)222 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)223 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)224 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)225 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)226 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)227 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)228 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA) 10066306-AP-BD+C CREDENTIAL ID 30 MAR 2010 ISSUED 27 MAR 2022 VALID THROUGH GREEN BUSINESS CERTIFICATION INC. CERTIFIES THAT Tammy Cook- Weedon HAS ATTAINED THE DESIGNATION OF LEED AP® Building Design + Construction by demonstrating the knowledge and understanding of green building practices and principles needed to support the use of the LEED® green building program. MAHESH RAMANUJAM PRESIDENT & CEO, U.S. GREEN BUILDING COUNCILPRESIDENT & CEO, GREEN BUSINESS CERTIFICATION INC. 229 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)230 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)231 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)232 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)233 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)234 TAB F firm references and similar work completed City of Sunny Isles Beach - North Bay Road Pedestrian Bridge 235 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA) Tab F - Firm References and Similar Work Completed CGA has an extensive amount of experience spanning over 50 years with similar scope of work as outlined in this RFQ. Town of Davie Professional Services (Ongoing) 6591 Orange Drive Davie, Florida 33314 Point of Contact: Jonathan Vogt Town Engineer Phone Number: 954.797.1137 Email Address: Jonathan_Vogt@davie-fl.gov CGA has provided continuing professional services to the Town of Davie since 2008. Services include: Roadway, Traffic and Transportation Engineering services including roadway design, signal design, maintenance of traffic "M.O.T.", traffic studies, second order storm drainage improvements, inspections, underground utility upgrades and other services as needed. Land Development, Civil-Site and Drainage Systems; engineering services for site developments projects to include planning, civil site and drainage improvements, preparation of construction documents, budgeting, approval, permitting, bidding, construction, final project closeout upgrades and other services as needed. Architectural Landscape; architectural services for the enhancement of areas which can include landscape design of parks, greenways and recreational facilities, pedestrian and bicycle networks, signage, general beautification projects and other services as needed. Surveying and Utility Locates; technical services to develop topographic and boundary plans, locate underground utilities, perform exploratory borings, generate location maps, collect GIS data and other services as needed. Construction Inspection; technical services for on-site construction inspection, certify construction to technical specifications, monitor project schedule, review pay applications, support project management activities and other services as needed. Includes Construction Engineering Inspection work for FDOT. Projects completed for the Town include: • Master Lift Station #8 • Davie Road Improvements Phase I and II • College Avenue Improvements Phase I and II • Nova Drive Improvements • Bamford Park Artificial Turf Conversion • System III 30" Overhead Pipe Replacement • Lift Station #9 Rehabilitation • Lift Station #18 Rehabilitation • Generator Replacement - WTP/WWTP - System II/III • WTP Improvement 236 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA) Engineering Services (Ongoing) 655-96th Street Bal Harbour, Florida 33154 Point of Contact: Mike Alvarez, CGC, PWLF Utility Compliance Officer Phone Number: 786.566.3562 Email Address: MAlvarez@balharbourfl.gov CGA has provided continuing professional services to the Bal Harbour Village since 2017. Services include: Calvin, Giordano & Associates, Inc. (CGA) began providing professional services to Bal Harbour Village in 2017. Currently, CGA has a Continuing Engineering Services Agreement with Bal Harbour Village in order to assist the Village in various design projects and plan review services. These services include Civil Engineering, Electrical Engineering, Surveying, GIS, and Construction Services. On-going services for Bal Harbour Village: • Building Department Public Works Plan Review and Utilities Plan Review • Sunshine 811 Services – Manage Dig Tickets and Design Ticket Response • Florida Department of Environmental Protection – NPDES Annual Reporting, MDC MS4 TMDL Prioritization Plan and Assessment Plan • Miami-Dade County Department of Regulatory and Economic Resources Reporting – Sanitary Sewer System Modeling and Water Usage Reporting • GIS Database Verification and Updates – Water, Sewer, Drainage, and Site Lighting • Current Design / Construction Projects • P.S. No. 1 Drainage Improvements – Project Management, Bidding, Engineering During Construction, and Construction Services • Phase-3(a) Infrastructure Improvements – Project Management, Civil Engineering Design, Bidding, Engineering During Construction, and Construction Services • Phase-2(b) Water Main Replacement – Project Management, Exploratory Investigation via Geotechnical Engineering and Subsurface Underground Exploratory • Park Dr. 16” WM Abandonment and Replacement Review – QA/QC of the design plans, Construction Services. 237 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA) City of Miami Gardens Professional Services (Ongoing) 18605 NW 27th Avenue Miami, Florida 33056 Point of Contact: Cameron Benson City Manager Phone Number: 305.622.8001 Email Address: CBenson@miamigardens-fl.gov CGA has provided continuing professional services to the City of Miami Gardens since 2013. Services include: • Civil Engineering • Environmental • Planning General • Construction Engineering Inspections (CEI) • Surveying • Landscape Architecture • GIS Services Projects Completed for the City Includes: • Rolling Oaks Park Pedestrian Trail • Bank of America Traffic Reviews • GIS Mapping • Sign Code Rewrite • Hard Rock Stadium Pedestrian Bridges and Tunnels • NW 27th Avenue Corridor Beautification Project • NW 183rd Street - Phase II Beautification Project • Vista Verde Community Park • Parks Bond - Construction Management 238 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA) City of Miami Beach (Ongoing) 1700 Convention Center Drive Miami Beach, Florida 33139 Point of Contact: David Gomez Senior Capital Project Coordinator Phone Number: 305.673.6071 x 6732 Email Address: DGomez@miamibeachfl.gov CGA has provided continuing professional services to the City of Miami Beach since 2004. Services include: • Civil Engineering • Environmental • Planning General • Construction Engineering Inspections (CEI) • Surveying • Landscape Architecture • GIS Services • Traffic Engineering Projects Completed for the City Includes: • Miami Beach North Shore Neighborhood • Block Beach Walk Construction • Electrical Power Distribution Design • Flagler Monument Solar Lighting • Miami Beach South Pointe Park – Pylon Lighting • Middle Beach Recreational Corridor Phase II • Middle Beach Recreational Corridor Phase III • All-Wheels Park Design Studies • North Shore Open Space Park • Police Department Emergency System Bidding and Construction Electrical ASA • Flagler Memorial Monument lighting ASA Update Electrical & Structural Plans • Beach Walk II Phase II – CEI • Middle Beach Phase III – Cultural Resources Assessment Survey • Police Department Roof Structural Analysis • Resiliency Cod eConsultant Services • Atlantic Way Width Redesign Modifications • NBOP Arborist Reports • Middle Beach Recreational Corridor Phase III – Arborist Reports • Police Department Electrical Assessment and Upgrades • Police Department Mechanical Plans for Generator Upgrades • Lummus Park/Indian Beach Park Survey – Middle Beach Recreational Corridor Phase III • Bay Drive Neighborhood Greenway • Urban Forestry 239 TAB G corporate standing and authorized signatory City of Sunny Isles Beach 240 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA) Tab G - Corporate Standing and Authorized Signatory 241 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)242 TAB H forms and attachments City of Sunny Isles Beach 243 City of Sunny Isles Beach |Request for Qualifications No. 20-07-01 33 DELIVER TO: City of Sunny Isles Beach City Clerk 18070 Collins Avenue Sunny Isles Beach, FL 33160 REQUEST FOR QUALIFICATIONS SECTION 6 RESPONDENT SUBMITTAL FORMS OPENING: 2:30 P.M. Tuesday, August 11, 2020 NOTE: City of Sunny Isles Beach is exempt from all taxes (Federal, State, and Local). Tax Exemption Certificate furnished upon request. Issued by: Purchasing Agent Genesis Cuevas Date Issued: Wednesday, July 8, 2020 This Qualification Submittal Consists of all required forms, including SF330, Questionnaires, Acknowledgements and Affidavits Submissions are subject to the Terms and Conditions of this Request for Qualifications and the accompanying Submittal. Such other contract provisions, specifications, drawings or other data as are attached or incorporated by reference in the Submittal, will be received at the office of the City Clerk at the address shown above until the above stated time and date, and at that time, publicly opened for furnishing services described in the accompanying Submittal Requirement. RFQ No. 20-07-01 Continuing Contract for Professional Services CCNA Firm Name ________________________________________ Commodity Code(s): RETURN ONE ORIGINAL AND FOUR COPIES OF QUALIFICATION SUBMITTAL PAGES AND AFFIDAVITS FAILURE TO SIGN PAGE 38 OF SECTION 6 QUALIFICATION SUBMITTAL WILL RENDER YOUR SUBMISSION NON-RESPONSIVE Calvin, Giordano & Associates, Inc. N/A 244 City of Sunny Isles Beach |Request for Qualifications No. 20-07-01 34 6.1 ACKNOWLEDGEMENT FORM NAME OF COMPANY: ___________________________________________ (Name of company submitting RFQ) CHECK CATEGORY (CATEGORIES) YOU ARE APPLYING FOR: 1- ARCHITECTS __ 2- CIVIL ENGINEERS__ 3- ELECTRICAL ENGINEERS___ 4- SURVEYORS AND MAPPING__ 5- LEAK DETECTION STUDIES__ 6- MECHANICAL, HVAC & PLUMBING ENGINEERS___ 7 - GEOTECHNICAL___ 8 – STRUCUTRAL ENGINEERS___ 9 – ENVIRONMENTAL ENGINEERS____ 10. CONSTRUCTION ENGINEERING AND INSPECTION (CEI) SERVICES____ Calvin, Giordano & Associates, Inc. 245 City of Sunny Isles Beach |Request for Qualifications No. 20-07-01 35 REQUIRED FORMS PRIME FIRM Role Name of Individual Assigned to Project Number of Years’ Experience Education, Degree Principle-in-Charge: Project Manager Asst. Project Manager Other Key Member Other Key Member REFERENCES Name Firm Providing Reference Phone # Email Address Mike Alvarez, CGC, PWLFUtility Compliance Officer DGomez@miamibeachfl.gov City of Miami GardensLeslie Pettit, PEProject Manager David GomezSenior CapitalProject Coordinator 954.329.8487305.622.8000 x 2570 Bal Harbour Village City of Miami Beach Town of DavieJonathan Vogt, PETown Engineer 954.797.1113 305.673.7000 x 6650 786.566.3562 jonathan_vogt@davie-fl.gov MAlvarez@balharourfl.gov lpettit@miamigardens-fl.gov Sarah SinatraGould, AICP Master in Urban & RegionalPlanningB.A. in Political Science 16 16Jenna Martinetti, PE B.S., Civil Engineering Steve Watts, PSM Erik Padron, PE Sandra Lee, AICP CEP,CFM, LEED AP BD+C 36 BSLS; Land SurveyingHonorary Electrical Engineering BS Civil Engineering & MSCivil Engineering Structural Jorge Cervantes, PE 32 22 M.A Biology/EcologyB.A Biology/Botany30+ 246 247 City of Sunny Isles Beach |Request for Qualifications No. 20-07-01 37 RESPONDENT SUBMITTAL FORM RFQ 20-07-01 Continuing Professional Consulting Services (CCNA) The undersigned Firm proposes and agrees, if this submission is accepted, to enter into an agreement with the City of Sunny Isles Beach to perform and furnish all Services as specified or indicated in the Contract Documents. The Firm accepts all of the terms and conditions of this Request for Qualifications. This Bid will remain subject to acceptance for 90 days after the day of Bid opening. The Firms agrees to sign and submit the Agreement and other documents as required by the Bidding Requirements within ten days after the date of the City’s Notice of Award. In submitting this response, the Firm represents, as more fully set forth in the Agreement, that:  The Firm has familiarized himself/herself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Law and Regulations that in any manner may affect cost, progress, performance, or furnishing of the Work.  The Firm has studied carefully all reports and drawings of subsurface conditions and drawings of physical conditions.  The Firm has given the City written notice of all conflicts, errors, discrepancies that it has discovered in the Contract Documents and the written resolution thereof by City is acceptable to the Firm.  This solicitation is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation; the Firm has not directly or indirectly induced or solicited any other Firms to submit a false or sham Bid; the Firm has not solicited or induced any person, firm or corporation to refrain from Bidding; and Firm has not sought by collusion to obtain for itself any advantage over any other Firms or over the City. The City and the successful Firm will establish completion times for the services described in this Request for Qualifications and the successful Firm agrees that the services will be completed within the time frames agreed upon and stipulated in the individual Notice to Proceed. 248 249 City of Sunny Isles Beach |Request for Qualifications No. 20-07-01 39 AFFIDAVITS 250 251 PUBLIC ENTITY CRIMES City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a) FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES PUBLIC ENTITY CRIMES Pursuant to the provisions of paragraph (2) (a) of Section 287.133, Florida State Statutes - "A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a Bid on a Contract to provide any goods or services to a public entity, may not submit a Bid on a Contract with a public entity for the construction or repair of a public building or public Work, may not submit Bids on leases of real property to a public entity, may not be awarded to perform Work as a Contractor, supplier, Sub-Contractor, or Consultant under a Contract with any public entity, and may not transact business with any public entity in excess of the threshold amount Category Two of Sec. 287.017, FS for thirty six months from the date of being placed on the convicted vendor list". THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS. 11.1. This sworn statement is submitted to City of Sunny Isles Beach _____________ by____________________________________________________________________________ [print individual’s name and title] for____________________________________________________________________________ [print name of entity submitting sworn statement] whose business address is: _______________________________________________________________________________ _______________________________________________________________________________ and (if applicable) its Federal Employer Identification number (FEIN) is_____________________. (If the entity had no FEIN, include the Social Security Number of the individual signing this sworn statement:_________________________________.) 11.2. I understand that a "public entity crime" as defined in Paragraph 287.133(1)(g), Florida Statutes, means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or with the United States, including, but not limited to, any Bid or Contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation. 11.3. I understand that "convicted" or "conviction" as defined in Para. 287.133(1)(b), Florida Statutes, means a finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trail court of record relating to charges brought by indictment or information after July 1, 1989, as a result of a jury verdict, non-jury trial, or entry of a plea of guilty or nolo contendere. 11.4. I understand that an "affiliate" as defined in Para. 287.133(1)(a), Florida Statutes, means: a.) predecessor or successor of a person convicted of a public entity crime; or b.) Any entity under the control of any natural person who is active in the management of the entity and who has been convicted of a public entity crime. The term "affiliate" includes those officers, directors, executors, partners, shareholders, employees, members, and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair DECEMBER 28, 2010 Calvin, Giordano & Associates, Inc. 1800 Eller Dr, Suite 600, Fort Lauderdale, FL 33316 65-0013869 Sarah Sinatra Gould, AICP, Planning Director 252 253 254 255 256 City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA) Customer satisfaction is CGA’s primary objective for every project undertaken by the firm. As such, CGA endeavors to complete each project on time and within budget. CGA is proud to assert that CGA has not failed to provide products, perform services, or furnished goods for which we have been contracted. 1. Kevin Young vs. Calvin, Giordano, & Associates, Inc., Case NO: 0:13-cv-61870-Scola/Otazo-Reyes, filed in United States District Court for the Southern District of Florida, Fort Lauderdale Division. ADA lawsuit. The parties have dismissed this case with prejudice in accordance with Federal Rule of Civil Procedure 41(a)(1)(A)(ii). Dismissal with prejudice, ECF No. 66) on December 19, 2014. 2. Hummer v. CTS1, Inc., Russell Engineering, Inc., Calvin Giordano & Associates, Inc, and AE Engineering, Inc. CACE 16-008549. This lawsuit relates to an alleged bicycle accident that occurred within the boundaries of the construction project known as the A1A washout project along A1A in Fort Lauderdale, Florida [Broward County]. The nature of the project related to widening sidewalks, reducing traffic lanes, adding traffic signals, and adding a seawall along A1A Sunrise Boulevard North to NE 18th Street. Dismissed on 10/12/18 for Calvin, Giordano & Associates, Inc. Calvin, Giordano & Associates, Inc. Litigation Information (last 5 years) August 2020 257 258 259