HomeMy WebLinkAboutCalvin, Giordano & Associates, Inc.City of Sunny Isles Beach
Government Center
Attn: City Clerk
18070 Collins Avenue
Sunny Isles Beach, FL 33160
Continuing Professional
Consulting Services (CCNA)
RFQ No.:
20-07-01
Due Date and Time
August 18, 2020 at 2:30 PM
Electronic
Continuing Professional Consulting
Services (CCNA)
Request for Qualifications No.
20-07-01
Prime Firm:
Calvin, Giordano & Associates, Inc.
Due Date and Time:
August 18, 2020 at 2:30 PM
Primary Contact
Jenna Martinetti, PE
Project Manager
JMartinetti@cgasolutions.com
Address:
1800 Eller Drive
Suite 600
Fort Lauderdale, FL 33316
Telephone No.:
954.921.7781
1
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)
TABLE OF CONTENTS
Tab A - Title Page .......................................................................................................................................1
Tab B - Table of Contents ..........................................................................................................................2
Tab C - Cover Letter and Executive Summary .........................................................................................3
Tab D - Project Approach and Understanding .........................................................................................6
Tab E - Qualification Information and Assigned Personnel ..................................................................22
Tab F - Firm References and Similar Work Completed .......................................................................235
Tab G - Corporate Standing and Authorized Signatory .......................................................................240
Tab H - Forms and Attachments ...........................................................................................................243
City of Sunny Isles Beach - Pedestrian Park Bridge Feasibility Study
2
TAB C
City of Sunny Isles Beach - CEI Bridge
cover letter and executive summary
3
4
5
TAB D
project approach and understanding
City of Sunny Isles Beach
6
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)
Tab D - Project Approach and Understanding
Calvin, Giordano & Associates, Inc. (CGA) is pursuing the following work categories:
• Civil Engineers
• Electrical Engineers
• Surveyors and Mapping
• Environmental Engineering
• Construction Engineering and Inspection (CEI) Services
Below is a table below of the services CGA will be providing along with the Project Manager for each service and their contact
information. The Overall Project Manager/Point of Contact for this RFQ will be Jenna Martinetti, PE.
Categories Project Manager Contact Information
Civil Engineers Jenna Martinetti, PE JMartinetti@cgasolutions.com
Tel: 954.921.7781
Electrical Engineers Jorge Cervantes, PE JCervantes@cgasolutions.com
Tel: 954.921.7781
Surveyors and Mapping Steve Watts, PSM SWatts@cgasolutions.com
Tel: 954.921.7781
Environmental Engineering Sandra Lee, AICP CEP, CFM, LEED AP
BD+C
SLee@cgasolutions.com
Tel: 954.921.7781
Construction Engineering and Inspection
(CEI) Services
Erik Padron, PE EPadron@cgasolutions.com
Tel: 954.921.7781
On the following pages, you'll find project approach and understanding for each category that CGA is pursuing.
7
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)
CGA’s general approach on design, development, and
construction related projects are outlined below. Variations
will occur depending on the requirements of a particular task
order.
Project Scoping: Upon receiving notification of a potential
project, CGA’s Project Manager (PM) will meet with the City’s
Project Manager to determine the project scope, schedule,
budget and other requirements of the project. The PM will
brief the CGA project team and begin to conduct project
scoping requirements. Due diligence will be performed before
preparing a conceptual sketch or a letter of understanding
for the City’s review and concurrence. Due diligence may
include, but will not be limited to:
• Reviewing City’s Ordinances, if requested;
• Reviewing the Manual on Uniform Traffic Control
Devices (MUTCD) and Florida Department of
Transportation (FDOT);
• Researching and obtaining available documents
such as existing permits, records and R/W
information; and
• Site visit to understand any project constraints and
challenges.
Task Order: Once the project scope and area have been
agreed upon, we will then prepare a task order document.
This document will include a description of the project, to
include but not limited to:
• The scope of services to be performed;
• Schedule of professional fees;
• Labor matrix;
• Critical path schedule;
• Preliminary engineer’s opinion of probable costs;
and
• List of key project team members with their roles and
qualifications for working on that particular project.
Project Commencement / Kick-off Meeting: All task orders
will begin with a Project Kick-off Meeting, during which the
CGA project manager (PM) will meet with the appropriate
City staff. The project manager will then assemble the project
team required for the task at hand.
The tasks of the project will be outlined at the “Kick-off
Meeting.” The team will be introduced to the scope, the
budget and the timeline, and the PM will define the various
elements of the project and the quality control/quality
assurance requirements at this meeting. The project manager
will regularly review the status of the project to ensure that the
CGA Team is meeting the project’s schedule and budgetary
requirements as initially defined, and update the client of the
project’s progress.
Fieldwork: For task orders involving the analysis of
existing conditions, the design of proposed improvements,
or management of ongoing work, CGA will perform a site
field review. Depending on the nature of the task order, this
may include observations of the site, traffic data collection,
topographical survey, Environmental Assessment and/or
a survey of existing structures. In most instances, CGA’s
familiarity with the City can expedite this process.
Utility Coordination: For any task order that involves design,
review or project management of proposed improvements,
CGA will coordinate with the various utility companies to
determine the location of existing and future planned utilities.
In certain projects, this will also entail coordination with
US Utility Potholing & Air Excavation (USPAE) to complete
Subsurface Utility Investigation investigation. This data will be
included on any right-of-way and design survey and will be
used throughout the design, review and project management
process.
Project Approach and Understanding - Civil Engineers
8
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)
Stakeholder Input: Depending on the specific project, it may
be desirable to engage and include stakeholder input early on
in the process to obtain buy-in from those individuals most
impacted by the project. Schematics, aerial images, and
renderings allow for input on the plan to meet the needs and
requests made by stakeholders. When requested, CGA can
also utilize our interactive resident voting devices to obtain
quick and effective input from residents.
Preparation of Preliminary Deliverables: CGA will prepare
preliminary plans and technical memorandums. These
documents and specifications may include the following
items as needed:
• Environmental analysis;
• Preliminary site plans;
• Preliminary planting plans;
• Preliminary building plans;
• Preliminary roadway and drainage design plans;
• Pedestrian Studies;
• Access Management Studies;
• Drainage Review;
• Geotechnical Investigation;
• Preliminary Utility Alignments;
• Intersection lane analysis;
• Lighting justification report;
• Recommended typical cross section(s) for proposed
roadway improvements;
• Layout of signalization improvements; and
• Preliminary structural analysis and plans.
These documents and specifications will be submitted to the
City for review, comment and approval.
Preparation of Plans/Deliverables: CGA will meet with City
representatives and receive comments on the preliminary
submittals. Following the meeting, our team will prepare a
written response to the design comments, make appropriate
changes and continue to the 60% and 90% completion level.
The 60% and 90% design documents will then be submitted
to the City for review, comment and approval.
Permitting: After receipt of the City’s input at the 30%
drawings, CGA will conduct preliminary meetings with the
Agencies Having Jurisdiction (AHJ). After the 60% plans have
been reviewed and approved by the City, permit applications
will be made to the appropriate agencies. CGA will utilize our
long-term relationships with the staff at the AHJs to follow up
and expedite all permit approvals.
9
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)
Preparation of Final Plans/Deliverables: CGA will meet
with representatives of the City to receive their comments
on the 90% plans submittal. Following the meeting, CGA will
prepare a written response to comments, make appropriate
revisions and complete the preparation of the deliverables as
defined by each task order to include:
• Technical specifications;
• Bidding documents; and
• Final construction plans in accordance with the City
standards.
These plans, specifications, and bid documents can be used
for the solicitation of competitive bids for the construction.
Bidding / Award / Notice to Proceed: When the scope of
work requires a competitive bid process, the CGA Team will
assist the City with the bid management process to include:
• Advertisement;
• Pre-bid meeting;
• Response to bidders questions;
• Preparation and issuance of addenda;
• Evaluation of bids; and
• Preparation of a recommendation of award for the
construction contract.
Construction Administration/Engineering Services During
Construction: CGA will provide the necessary support to
provide construction administration services to respond
to RFIs and review shop drawings. We will undertake the
required field inspections, contract administration, project
certification and project coordination. We are committed to
provide expert field inspection services such as:
• Contract negotiation
• Implementing quality control and assurance
programs
• Contract document review
• Shop drawing review
• Administration of contractor RFIs
• Observation of field activity to assure construction
is completed in accordance with construction
documents
• Payment request recommendation, change order
administration
• Environmental and NPDES monitoring
• Field report and documentation
• As-built record drawing preparation
• Agency/permit closeout documentation and
certification
Task Order Closeout: Once all tasks have been completed,
the Project Manager will work with the City’s representative to
close out the task order, including the punch list process, and
closing out all required grant applications and open permits.
10
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)
The proposed approach for a lighting project will consist of
a five-step process involving: (1) Night-time assessment
and documentation of existing conditions; (2) Preliminary
design and fixture selection; (3) Design development; (4)
Final Design; (5) Engineering support during bidding and
construction phases.
A. Night-time assessment of existing conditions:
In any lighting project, one of the most important
steps is to understand the current conditions for the
given site. The proposed night-time assessment will
allow the engineer to observe the current lighting
conditions and determine any problem areas,
impacts of physical obstructions such as trees, and
the overall quality and appropriateness of the existing
lighting facilities. The engineer will take readings
with a calibrated light meter throughout the areas of
interest (typically at 10’ to 20’ intervals) that will later
be compared to the photometric software simulation
results of the same areas. The results of the night-
time assessment will be utilized to create an existing
conditions site photometric plan. The observed vs.
simulated data comparison is important because it
provides a realistic picture of the lighting conditions
by emphasizing the effect of actual obstructions that
are, typically, not accounted for in the photometric
software simulation alone. This allows the engineer
to ascertain the site areas and lighting system
elements that will require additional attention in the
design process.
B. Preliminary design and fixture selection: The
focus of the preliminary design approach will be to
utilize the existing poles at the site, if desired and
possible, and consider light fixture retrofit options
using Light Emitting Diode (LED) technology. The
advantages of LED technology include lowered
energy consumption, longer fixture lifetime (lowered
maintenance / re-lamping costs), and improved
lighting performance via perceived and verifiable
results. If their will be a high level of pedestrian
traffic through the project area, LED fixtures with
vandal resistant features may be the preference. In
addition to the conventional pole-mounted fixtures,
the incorporation of bollard lighting may be an option
for some projects. This type of lighting will be
beneficial in areas of extreme canopy cover where
much of the light from the primary light poles is
being blocked.
The goal of the preliminary lighting design will be to
meet security lighting standards as defined by the
Illumination Engineering Society of North America
(IESNA) as well as any local ordinances regarding
light levels and lighting spillover at the property
line. Our electrical engineering staff will provide
photometric simulations with the various LED
fixtures selected for consideration and will work with
the staff to review the results and assist in making a
decision on the best possible fit for the project.
C. Design development: Once the appropriate fixture
(or set of fixtures) has been chosen by the City, the
engineer will update the design and perform the load
calculations and circuiting design for the project.
The electrical power distribution source will be
reviewed and discussion with FPL will begin. For the
lights to be retrofitted, the engineer will determine
the adequacy of the existing wiring to support the
revised loads. For lights that will require new poles,
the electrical feed will be sized to handle not just
the presently proposed lighting loads, but also any
future lighting enhancements that may be desired.
Coordination with other disciplines involved in the
project must occur during this phase to make sure
any proposed light pole locations are coordinated
with proposed landscaping, do not impact ADA
access or improvements, and power requirements
are coordinated.
Project Approach and Understanding - Electrical Engineers
11
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)
D. Final Design: Once the design is substantially
complete, the electrical engineer will have a final
design review meeting with the City and project team
to go over all of the details of the project and make
any required final adjustments. This may include
a site visit to examine proposed pole locations,
trenching paths, review of any subsurface utility
investigation (soft dig) information, and evaluate any
potential conflicts with existing or future facilities.
The final set of plans shall include electrical notes
and specifications, electrical site plan, electrical
riser diagram, electrical details for the proposed
equipment and pole modifications, photometric site
plan and a set of structural plans and calculations to
confirm compliance with all applicable windloading
requirements including the current edition of the
Florida Building Code and Broward County High
Velocity Hurricane Zones.
E. Engineering support during bidding and
construction phases: During the bidding and
construction phases of the project, our electrical
and construction engineering staff is well
accustomed to providing in-depth support to the
project administrators. Whether responding to
RFIs, assisting with contractor building department
questions, issuing clarifications of the contract
documents, reviewing shop drawings, attending
construction progress meetings, or performing
construction inspections, our staff will always be
ready, willing, and able to play a significant role during
the bid and construction phases. Our experience
has been that the most successful projects are those
which have a high level of engineering involvement
and support during the bid and construction phases
– this would be our targeted approach to this project.
This approach tends to create a ‘team’ mentality
where all of the players involved become actively
engaged in accomplishing a common goal – the
successful completion of the project.
In addition, since CGA is committed to unmatched
customer service and satisfaction, we make it a
priority to provide quick and effective responses
to all client correspondence or requests – thereby
emphasizing our appreciation, respect, and
commitment to the client. The overarching goal
of our consulting approach is to build a seamless
relationship with the client that is based on open and
effective communication – a relationship driven by
teamwork, cooperation, and common goals.
The approach to projects requiring electrical
engineering support for proposed buildings,
treatment plants upgrades, irrigation controllers,
and proposed pump stations for stormwater, water,
and wastewater is similar to the above approach;
however, the existing systems would be reviewed in
a site visit with City staff to determine what upgrades
are needed in order to support the proposed
improvements. The electrical engineering design is
reviewed during the quality control review process
with any other involved disciplines to ensure the
construction documents are coordinated.
12
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)
Surveyors and Mapping
As CGA has and continues to provide professional surveying
and mapping services to various municipalities in the
South Florida region, we have a vast amount of knowledge
and experience in the municipal consulting field. We have
assembled a team of qualified surveying professionals who
have completed numerous surveying projects of similar
scope, who possess the diversity of technical skills required
for successful completion of any task within this project and
who have the full understanding of the requirements and
intricacies of completing surveying projects in the City of
Sunny Isles Beach. The team is fully committed to dedicating
the necessary manpower, expertise and attentiveness to
ensure the City meets its objectives through the provision of
these services.
In general, CGA's approach to the Surveying Scope of
Services is outlined below.
Initial City Request – Upon receipt of the City’s request, the
CGA Survey/Mapping Project Manager (SPM), Steve Watts,
PSM, will hold a phone conference or in-person meeting to
compile a project information package from the City. Part
of this stage is to identify the specific survey request, as
well as what the desired intent is of the survey project. For
example, a construction layout survey that will progress into
a full ALTA|NSPS Land Title Survey of the site may require a
different layout of survey control versus one that just has a
stakeout component. It is at this stage that the groundwork
is laid for a successful survey that will allow our team to
determine the complete scope of work, required schedule,
budget and final deliverables at the onset of the project.
Project Research – Prior to any mobilization of field crews,
Steve will complete the necessary due diligence of the
information gleaned from the Initial City Request stage.
This includes a search of the public records including the
Miami-Dade County Property Appraiser’s office; Clerk of
the Court; Miami-Dade County Section Maps, City of Sunny
Isles Beach information and NGS websites together with any
Google street view type applications. This upfront research
assists in identifying property boundaries, easements and/
or other encumbrances that may exist on a specific parcel.
From this research, a survey field map will be generated
identifying survey traverse control points together with any
found property and/or right-of-way monuments within the
area. Utilizing the County Parcel GIS map, CGA will upload
property corner search ties which are referenced to state
plane coordinates directly into our GPS data collectors. This
process allows field crews to navigate directly to a possible
corner location within centimeter accuracy. Utilizing this
process enables us to perform the same type of location for
buried valves, manholes or other type of as-built infrastructure
referenced to state plane coordinates.
Project Schedule and Budget – Most survey projects have
a total project length from Notice-to-Proceed to final survey
deliverable of less than 3-4 weeks. Upon receiving the initial
survey/mapping request and due diligence is completed,
CGA will immediately prepare a man-hour estimate and crew
schedule to complete the survey tasks within the critical path
timeframe. Any survey projects of size and complexity that
require a more substantial timeframe to complete (3-4 month
survey project). CGA will coordinate this schedule with the
City to obtain feedback on both the schedule and proposed
budget.
Team Communication – The Project Team will hold weekly or
more frequently if needed, meetings to discuss project status,
updates, issues and resolutions to issues. CGA will maintain
constant communication with the City and will provide status
updates as the project progresses.
Project Approach and Understanding - Surveyors and Mapping
13
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)
Final Deliverables – Prior to issuance of any final deliverables
to the City, the survey information and data backup will be
routed through the CGA QA/QC process to ensure the City
is provided with a fully accurate survey document, that is
in compliance with all City, County and State land surveying
requirements.
Extension of Staff
CGA will work with the City of Sunny Isles Beach as an
extension of their staff by keeping open communication via
emails, phone calls and frequent status/progress meetings.
Upon assignment of the project, CGA’s Project Manager,
Steve Watts, will have a kickoff meeting with City staff to
review the tasks required, the approximate schedule, budget
and staff requirements for the project. CGA will request
that staff provide any as-built information, previous project
surveys or construction plans on site or adjacent to the
project. Upon completion of due diligence, CGA will provide
a detailed surveying scope of services for staff to review and
approve. Once a Notice-to-Proceed has been issued, survey
crews will be on-site within days to perform data collection.
City staff will be updated as to project progress, schedule
and completion date throughout the duration of the project.
Issues or Concerns of Significance
We believe the issues or concerns in relation to this project
is that as advances are made with respect to highly technical
RTK GPS and 3D Scanner survey equipment that it is even
more imperative that the City’s consultant understand the
capabilities, but also the limitations of such equipment. Our
experienced staff has been through the pratfalls of the various
issues with this type of equipment and have the knowledge
of when to use this type of equipment but more importantly
know when not to use it based on the specific survey task.
Advanced Survey Equipment
Some of the most state-of-the art surveying equipment that
exists today is part of our inventory. The Leica ScanStation
C10 is a 3D Laser Scanner which enables us to develop
high definition surveys for such applications as water and
wastewater treatment plants, pump station rehabilitation,
facilities management inside of buildings and a multitude of
other survey projects. As CGA is a full-service consulting
company providing civil engineering, landscape architecture,
GIS and land planning services, the survey department is well
versed in providing detailed and accurate surveying data for
engineering projects relating to water distribution systems,
storm drainage and sanitary sewer infrastructure.
As CGA is one of the few South Florida consulting firms to
have a full-scale GIS department providing data population
and application development for a number of government
entities, the survey department has developed capabilities to
provide efficient field data collection for rapid download into
GIS databases. Using Trimble Real Time Kinematic (RTK)
GPS equipment with Blue Tooth wireless technology and tied
into the Florida Continuously Operating Reference Stations
(CORS) allows us to collect vast amount of data referenced
to the latest horizontal and vertical datums as established by
the National Geodetic Survey Department (NGS). Having a
sophisticated IT department working in conjunction with the
GIS and Survey departments all under one umbrella, enables
data transfer and database entry from remote locations
seamlessly. Issues that plague large GIS\Survey projects
regarding incompatibility between field and office, software
application to software application are non-existent at CGA.
14
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)
Calvin, Giordano and Associate’s (CGA) has developed a
broad environmental service base to fully understand and
serve all the needs of our clients, and to fully address all
natural resource considerations. Our diverse and in-depth
work experience has provided us with a critical understanding
of current environmental planning and permitting issues,
and the historic impacts that have affected our natural
resources. The integration of our highly technical field skills,
in-depth knowledge of regulatory details and overall project
requirements allows us to efficiently address project needs
from inceptions to completion.
CGA environmental staff stays current on regulatory
updates and has also built long-lasting relationships with
the regulatory agencies. Our environmental staff is skilled
in addressing considerations in pristine natural resource
settings to urbanized settings, both benthic and terrestrial,
and the natural resource features unique to your coastal
barrier island community. CGA has long provided municipal
contract service in diverse settings and structures and knows
how to maintain effective communication, to be a valuable
asset to your City, and to efficiently and effectively implement
your projects, your goals and your vision. It is our practice to
work closely with your Staff.
Upon being awarded a project by the City, CGA will meet with
the City to determine and confirm the specific requirements
of the project, the City’s timeline, coordinating partners,
chain of contact, deliverables, and what supporting elements
the City may be providing. Anticipated or potential project
challenges will be discussed and identified at this meeting,
such as external agency technical coordination in permitting
that may require extended time frames for completion, or
imperiled species surveys that can only occur in limited time
windows.
CGA will establish our project staffing needs, the appropriate
sequencing of work including those tasks that can run
concurrently, and a progress schedule. Ongoing, CGA will
continually review the progress of the project to assure meeting
the projected timeline and budget as approved by the City.
The CGA project manager will maintain close communication
with each team member and any coordinating partner(s) and
will periodically update the City of the project progress. As
scheduled, or requested by the City, the CGA project manager
will provide deliverables in the format(s) specified by the City.
Any adjustments due to circumstances such as changing
conditions or change of the original scope occurring
throughout the duration of the project will be reviewed with
the City and adjusted as necessary upon City approval. All
permitting should run concurrently and optimal sequencing
for environmental permitting includes:
• Identifying all required jurisdictional agencies and
organizing and attending pre-application meetings
with them,
• Conducting the necessary site inspections to collect
the field data required to document the existing
natural resource conditions and potential for impacts
to sensitive habitats in submerged lands, shorelines
and adjacent uplands with the implementation of any
proposed project,
• Preparing the environmental documents, analyses,
and other environmental submittal information for
inclusion in the application submittal packages,
• Coordinate with engineering and other team
members to obtain all other required submittal
documents and plans for inclusion in the submittal
packages, completing applications forms, obtaining
signatures and checks, and submitting application
packages to the agencies,
• Coordinate and attend meetings, post submittal,
each with each of the permitting and commenting
agency, and
• Immediately responding to any request for additional
information.
Successful project implementation requires diligent
oversight, documentation and follow-up; as well as ongoing
clear, concise communication with the City and other project
partners. CGA’s staff is experienced and highly skilled in the
services required of by this RFQ and has adequate availability
in their existing workload to undertake the City’s scope of
work and maintain the high standards of deliverables the City
and CGA are accustomed to.
All of our projects adhere to a strict project management
system, wherein we weekly ensure that milestones are
met and risk management is averted, by addressing the
anticipated staffing needs of each project and matching
those needs with the most capable resources. CGA has
been able to accommodate its workload, while keeping our
mantra of personalized attention combined with responsive
solutions for each and every client. Additionally, CGA has
the experience and in-house resources to seamlessly cover
almost any eventuality that is encountered.
Project Approach and Understanding - Environmental Engineering
15
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)
Below you will find a brief synopsis of critical items of
interest that we follow for ALL our Construction Engineering
& Inspection (CEI) projects, pertaining to each scope of work
to be completed.
Roadway Construction and Maintenance projects: Our
proposed staffing is Construction Training Qualification
Program (CTQP) certified in earthwork (1 & 2), asphalt
paving (1 & 2), ACI (1 & 2), drill shaft, pile driving, IMSA, final
estimates (1 & 2), and QC manager as well as many others.
Asphalt and Paving: The team proposed by CGA is certified and
has extensive experience with milling, resurfacing, roadway
reconstruction, earthwork testing, utility adjustments and
pavement markings. The team will hold a pre-paving meeting
to review the specifications and plans requirements to ensure
compliance with contract documents. Review the asphalt
QC plan prior to paving, temperature testing is performed,
asphalt tickets collected, milling depth checked, cleanness
of milled surface prior to tack application, track asphalt and
tack application rates, quantities and ensure QC logs are
submitted within 48 hours. Perform cross slope checks and
a rolling straight edge to ensure compliance with the Florida
Department of Transportation (FDOT) ridability requirements,
noted deficiencies will be corrected. All VT tests will be
sampled and tested by the CEI team and performed at the
same frequencies listed in the FDOT standard specifications.
Ensure contractor uses track-less tack. CGA understands
the industry’s latest challenges with “tack balls”, raveling
and the use of non-electronic paving machines. The Senior
Project Engineer (SPE) or the Project Administrator (PA)
will be present on the field during the paving operation to
identify issues early and implement corrective measures.
Contractor’s paving machines, checked daily and the CPPR
process followed.
Earthwork: Ensure that all proper testing is performed,
specialized spreadsheets will be used for tracking of the
earthwork quantities, proper documentation in the density log
book, and verification of cross sections are the most major
issues related to earthwork on the project. De-mucking is
another critical operation that can impact time and cost on
a project. Proper tracking of quantities, ensuring complete
removal of the muck and proper disposal are key issues. CEI
team and the contractor will agree on cross sections prior to
backfilling to avoid delays and claims. The PA will perform QA
checks on the Density Log Book on weekly basis, conduct a
preearthwork meeting, three way calibration test and material
source verified.
Drainage: Our team will conduct a pre-activity meeting
prior to construction to discuss the contractor’s approach
and the requirements set forth in the contract plans, the
FDOT standard specifications and the FDOT standard index.
Timely submittal and review of shop drawings will be
critical expedite the material procurement process and help
expedite construction. Ensure that all filter fabric, bricks,
mortar and coarse aggregate is certified and sampled prior
to the installation of any drainage structures. Adherence to
elevations is essential to ensure proper drainage. Ensure
proper stamping and certification of drainage structures prior
to submittals and installation. No structure will be installed
without submittal of delivery ticket and proper certification.
Project Approach and Understanding - Construction Engineering and Inspection (CEI) Services
16
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)
Bridge Construction: SPE will hold a pre-concrete activity
meeting to go over the concrete placement and curing
requirements. Contractor’s concrete QC plan will be reviewed
in detail along with pile installation plan, pile support and
erection plan, crane specs and pile hammer specs. A pre-pile
installation meeting will include geotechnical engineer and
representatives from materials lab to review the specification
and plan requirements. Sr. bridge inspector will inspect pile
support erection and welding. The geotechnical engineer will
administer test pile installation and will provide a letter with
driving criteria. We will administer pile installation, curing
of deck using the continuous moisture curing, steel mat
inspection, vibration during concrete placement enforced
to eliminate any honeycombing. Pre-activity meeting prior
to installation of expansion joints, expansion joints will be
constructed after deck grooving to avoid damaging them.
Our team will use boats to perform an under deck inspection.
The PA will coordinate with the FDOT District Bridge Inspection
team to schedule the 90% and the 100% inspection. The
contractor will have to submit the bridge load rating prior to
the 100% inspection.
Signalization and Lighting: Ensure expedited submittal and
review of the signalization and lighting shop drawings and
reviewed for compliance with project plans, MUTCD, FDOT
Standard Index and County Specifications. Once approved,
we will coordinate the pre-lighting and pre-signalization office
and field meetings with the County, City, Florida Power &
Light (FPL) (if needed), and contractor. Then meet in the field
to establish locations of new load centers if any proposed. It
is critical to coordinate with FPL in advance to ensure that the
contractor isn’t delayed.
Signing and Pavement Markings: Materials certifications
submitted prior to the installation of final pavement
markings. All materials certifications will be reviewed for
conformance, thermoplastic layer won’t be applied until
14 days after placement of asphalt. A pre-sign installation
meeting conducted prior to construction, and then we will
conduct a thorough detailed review of signing and pavement
marking plans prior to construction and provide comments.
We will perform sign panel inspection for conformity of the
contract requirements regarding reflectivity, air bubbles, and
message on the sign. Utility owners will be contacted a week
in advance, to avoid conflicts with sign installation.
Utilities: We will begin by reviewing the utility work schedule
to create a map of all the utility work that is required on this
project, all utility owners invited to pre-construction meeting
and obtain status update on utility work especially work
required to be completed during construction.
Environmental Requirements: Construction activities
restricted to the limits shown in the plans, silt fence will be
installed, grates wrapped in filter fabric and all curb/gutter and
curb inlet sediment barriers are installed as per the standard
index. Usage of private properties will not be allowed without
a written agreement between the contractor and the private
property owner. The staging area will be coordinated,
reviewed and approved by all stakeholders prior. SPE will
review all permit requirements and share requirements with
the contractor to ensure compliance.
17
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)
Landscape Inspection (If needed): Before construction site
inspection to see if any trees / palms will be impacted and any
root pruning must be done. Meeting with County Landscape
Inspector on expectations. During construction, take soil
samples, nursery visit with contractor to tag plant material,
Florida Grade #1, or better to ensure minimum requirements
met. Ensure shop drawing submittal of fertilizer, staking/
guying, soil, pre-emergent herbicide, mulch and sod.
Document Control and Warranty: Our personnel will strive
to maintain legible, complete, properly indexed/archived, and
retrievable documents. We are committed to utilize the latest
software, our staff will also work with your in-house staff to
ensure that all warranty information is collected; tracked and
periodic inspections conducted to ensure the County received
the full value of these improvements. The incorporation of the
value added specification stipulates the inspection frequency
for each incorporated element and we will ensure that all
relevant information is entered into the County’s database
system. Our team will coordinate all the warranty requests
between the County and the contractor, we will perform
the periodic inspections during the life of our contract to
determine the corrective action for each deficiency, and we
will notify the contractor in writing of the items covered by the
warranty that require corrections.
Resident Compliance Support (RCS): We will monitor and
maintain files to comply with the Federal and State rules
and regulations concerning the compliance program. We
will maintain our constant lines of communications with the
County or FDOT resident compliance manager to ensure the
expedited flow of information between the team, County,
and FDOT. We will conduct a pre EEO/OJT/DBE meeting
with contractor and County or FDOT representative to
revive the compliance requirements listed in the contract.
Including Davis Bacon Act, payroll format, classification
and pay information, interviews with the contractor’s staff
to verify that the information provided in the payrolls are
accurate. Non- compliance letters will be issued as needed
for any compliance violation. Our RCS will monitor the on-
the-job training (OJT) program for compliance with the EEO
handbook and contract requirements.
During Substantial Completion Walk-through: 30 Days
prior to completion of project, we will meet with Contractor,
County Project Manager and our staff and walk entire site
to make note of deficiency’s. We will then generate a punch
list excel sheet. As each item is completed and/or fixed,
our inspector will date and comment on the completion of
the item. After all items are complete and confirmed by our
inspection staff prior to last day of contract, we will have a
final walk-through with the County Project Manager, CEI staff
(PA, SPE, inspection staff), FPL (and/or other designated
utility company), City (if needed) and Contractor.
Quality Assurance (QA): CGA will incorporate our QA
Checklist with the current Final Estimate Submittal checklist
Performs thorough review and oversight of the Quality Control
(QC) density log book by verification personnel to minimize
errors and potential delay to the final material certification.
• Perform bi-weekly reviews of material testing
results to ensure resolution of open samples, failing
test results and missing QC and/or verification
information.
• Generate and submit an accurate and timely Final
Offer Letter within 30 days of Final Acceptance.
• Maintain current and accurate records of field
changes and plan revisions for the preparation of the
as-built plans.
• Ensure that Maintenance of Traffic Plans are in
accordance with the MUTCD and that one lane of
through traffic is maintained throughout the whole
project limits.
• Continue to keep the residents, hospital, school and
businesses of the immediate area apprised of all
construction phasing throughout project duration.
18
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)
JOB SITE CONTROLS REGARDING DAMAGE TO EXISTING
INFRASTRUCTURE ADVERSELY AFFECTING NEIGHBORING
PROPERTIES AND/OR OCCURRING AFTER BUSINESS
HOURS
Public Information Outreach (PIO) and coordination: PIO
coordination will be a major activity that will require special
attention by the CEI team. Prior to project start date we
will note if private property owners have signs, lighting,
landscape, and other items that will be impacted during
construction. One of the things we do prior to any work being
done.
Pre-activity video and photos
• Note any damage to properties with video and
photos prior to construction.
Flyers
Prior to any construction being done, we have a project
representative walk door to door and hand out flyers to
affected residents and businesses. Information will include:
• Work that is being done, time frame, phasing, who
will be affected during specific dates and when
project is slated to be completed
• 3 points of contacts:
• 1st Point of Contact: Contractor Project Manager
(available 24 hours a day)
• 2nd Point of Contact: CEI PA and/or SPE
(available 24 hours a day)
• 3rd Point of Contact: County Project Manager
• This flyer comes in handy when any neighboring
properties are affected / damaged during
construction activities.
• Flyer for asphalt paving operations two (2) weeks
prior to affected residents and businesses and
other major operation flyers, such as drainage
improvements or road closures that residents need
to be informed two (2) weeks prior to any work
being done.
• We also encourage contractors to run each individual
property owners irrigation prior to any work being
done to ensure no damage is being done to their
existing irrigation systems.
It is very important for the flyers to go out prior to construction
so that if something happens after hours or during the
construction day, residents and business know whom to
call. CEI is a 24-hour day business in case any emergency
arises. We recently completed a project for the City of Coral
Springs, NW 110th Avenue Streetscape. Residents who
received a flyer called our PIO representative, who was able
to answer any questions or concerns about the streetscape
improvements. Other residents called stating an irrigation
line was cut during construction activities. We informed City
Project Manager, we noted address in our files, homeowner
was contacted within 24-hours by the contractor. The
irrigation line was then repaired at no cost to the resident.
We also had an issue with children breaking a newly planted
tree, the residents called our in-house representative from
the flyer, we noted the property address and filed it. We then
informed the City Project Manager and prime contractor. The
landscape subcontractor had the tree replaced within the
week.
Two (2) Week Advanced Notices: We will coordinate the
contractor’s construction with the property owners at least
14 days (2 weeks) in advance to minimize impacts to
those owners as much as possible. Mailboxes will have to
be maintained by relocating them during construction then
replacing them as needed.
Projects generally include the reconstruction of many
residential and commercial driveways. The driveways will
have to be constructed without impacting access to those
residents and business owners. The team will ensure that
either a temporary access is provided or the driveway
construction is performed over two operations to ensure
proper access is maintained.
Driveway owners will be contacted by the SPE and the PA two
(2) weeks in advance of any work impacting their driveway or
their access. We will keep the County’s PIO informed of any
Maintenance of Traffic (MOT) changes and lane closures. The
team will ensure that the lane closure times stipulated in the
plans are strictly adhered to by the contractor. Any request to
change the lane closure times or allow lane closures on the
weekends will be evaluated and discussed with the County
in advance.
The team understands the importance of coordinating with
the different stakeholders to ensure the success of the
project. The County, businesses and residents within close
proximity to construction will all be coordinated in advance
of construction activities.
19
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)
CGA also understands the importance of providing real up
to date information to the residents and businesses along
the corridor. CGA is prepared to provide door hangers during
the initial weeks of the project detailing the CEI contract
information and schedule. Our intent is to visit each impacted
resident or business owner to ensure they are aware of
the proposed improvements, our schedule and potential
impacts. Our experiences have proven that an informed
and knowledgeable community reduces the number of
complaints that each Local Agency will receive – our staff
will work as an extension of the County to ensure that all
issues are addressed timely with documentable solutions.
The team will perform a door to door notification in advance
of construction.
MANAGEMENT PRACTICE FOR MITIGATING SCHEDULE
AND BUDGET OVERRUNS
As part of the team’s project cost control system, during
the preparation of a task work order, the team will prepare
a budget form, which identifies all project-related costs.
The budget outline includes assigned personnel, associated
manpower and monetary allowances, equipment and direct
expenses, overhead, and FCCM. The contract fee is broken
down into categories, which are identifiable with activities/
items and sub-consultant services.
Once authorized, each task work order is then translated to
our accounting system and reflected in our internal progress
reports supplied to our clients and is summarized in the
task work order tracking spreadsheet. The spreadsheet will
be reviewed at our recommended monthly contract update
meeting with the County’s CEI Consultant Manager.
This will allow us to closely track where the contract’s
financial status thus eliminating any contract funding or time
issues. These are measures that we use on all our TWO
based contracts including the City of Fort Lauderdale, FDOT
District IV, FDOT District VI and FDOT Broward Operations
Center.
CGA’s accounting system has a powerful reporting tool to
ensure a tight control of ALL our project budgets. Periodic
(Principal-in-charge) reviews (monthly) are performed on
ALL project budgets, assigned resources, and associated
technical issues to guarantee that the project remains on-track,
within budget and that a quality service is being provided at all
levels. In addition, Critical Point Reviews of each Construction
Budget can be performed on any given project. Historical
cost data, as well as, the experience of our personnel are
utilized in establishing and controlling construction costs on
each of the task work order assignments.
Contract Scheduling and Resource Allocation: Project
and personnel scheduling are two of the most critical
functions to ensure the success of this contract. Being
proactive to events, anticipating task requirements and
finding timely staffing solutions will be key, to avoiding
delays in the execution of any required task. The team will
pay special attention to the Technical Special Provisions
and Supplemental Specifications for each project to ensure
that personnel exceed the experience expectations for the
required task. As required per the advertisement for this
contract, we have provided a personnel matrix, resumes and
qualifications, along with varying horticulture, arborist and
landscape architectural licenses and certifications. We will
maintain this matrix in a current ‘roster’ format for all our staff
and sub-consultants to provide the most qualified personnel
when needed by the County staff.
20
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)
Critical Path Method (CPM) Schedule Evaluations:
The timely submittal, review and acceptance of a contractor’s
baseline CPM schedule is the best indicator of the project’s
direction and contractor’s intent. With each assignment, our
Project Manager will request a copy of the accepted CPM and
updates to evaluate the durations required for our personnel to
successfully complete their duties. Our scheduling expertise
can also assist in evaluating project schedules for claim
analysis and preparation of construction time estimates.
JOB SITE SAFETY PERFORMANCE METRIC
MOT will be a major focus and point of emphasize to the team
and the contractor on your County projects. Ensuring that a
proper MOT plan is developed and implemented is essential
to the success of our project. Our team is experienced with
standard index 600 and MOT inspection. The team will ensure
timely submittal if the contractor’s MOT plan. The plan will
be reviewed by our team for comments then accepted if it
meets the requirements stipulated in index 600 of the Florida
Department of Transportation (FDOT) standard index. A copy
of the MOT plan will be on site at all times. Our inspectors
will ensure the inspection of the MOT on daily basis and
will ensure that deficiencies are recorded and addressed
immediately.
Our main focus will be providing a MOT that facilitates
traffic movement in a safe manner during construction.
We will ensure that pedestrian access is provided at all
times as stipulated in the plans and in the maintenance of
traffic-school/pedestrian document. We will ensure that the
contractor submits a notice to the County’s special projects
coordinator 30 days in advance of construction. The local
cities will be notified of any lane closures or MOT phase
changes at least two (2) weeks in advance.
We will keep the County’s PIO informed of any MOT changes
and lane closures. The team will ensure that the lane closure
times stipulated in the plans are strictly adhered to by the
contractor. Any request to change the lane closures times or
allow lane closures on the weekends will be evaluated and
discussed with the County in advance.
CGA also understands the importance of providing real up
to date information to the residents and businesses along
the corridor. CGA is prepared to provide door hangers during
the initial weeks of the project detailing the CEI contract
information and schedule. Our intent is to visit each impacted
resident or business owner to ensure they are aware of
the proposed improvements, our schedule and potential
impacts. Our experiences have proven that an informed and
knowledgeable community reduces the number of complaints
that each Local Agency will receive – our staff will work as an
extension of the County to ensure that all issues are addressed
timely with documentable solutions. We will make sure that
all driveway owners are notified two (2) weeks in advance
of any work impacting their driveways. The mailboxes will
be relocated as per plans and the specifications to allow for
continuous delivery of the mail. The team will perform a door
to door notification in advance of construction.
EXPERIENCE WITH THE FLORIDA DEPARTMENT OF
TRANSPORTATION (FDOT)
CGA is a premier governmental service provider with offices
throughout Florida. We have previously provided services
to the Department and numerous municipalities on task
work order driven contracts since the inception of our CEI
Department in 2002, and we have maintained an average
grade of 3.8 from our FDOT Contracts. Project Manager,
Moe Mabrouk, PE, has both managed and worked under
multiple general services contracts with the Department
– our team’s management and inspection experiences
bring an understanding of your expectations, processes
and procedures, which will allow our team to eliminate the
learning curve on this project.
Previously, CGA won a Task Work Order (TWO) based
contract for FDOT District 4 – Contract C9855; General CEI
Consultant Construction Support, which lasted from 2012 to
2017, where we provided Project Management and Inspection
Services on a variety of Construction Contracts throughout
Broward, Palm Beach and the Treasure Coast. Currently,
we have two (2) TWO driven contracts with the Florida
Department of Transportation; FDOT District 4 – Contract
CA052; Broward Operations CEI Consultant Construction
and FDOT District 6 – Contract C9O73; Districtwide Misc.
Construction Engineering Inspection Consultant.
21
TAB E
qualification information and assigned
personnel
City of Sunny Isles Beach - North Bay Road Pedestrian Bridge
22
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)
COMPANY'S HISTORY AND QUALIFICATIONS
Calvin, Giordano & Associates, Inc. (CGA) is a well established
multi-disciplinary firm with offices located in Fort Lauderdale,
Miami-Dade, West Palm Beach, Port St. Lucie, Estero, and
Clearwater. For over 80 years, our firm has been providing
consulting services to both public and private sector clients.
From the beginning, much of our reputation was built on
repeat business with clients from the public and private
sectors. Our success is reflected in the quality of work we
consistently provide and also in the personal approach we
take with each client. The winning combination is affirmed
by our large number of repeat/long term municipal clients.
Because of our diversity, CGA can control the entire
process, offering a host of professional services as a one-
source partner, or efficiently tackle time-sensitive individual
projects, providing customized solutions with handpicked
teams of highly experienced professionals. Custom building
Exceptional Solutions is the core of our business.
CGA strategically provides a broad range of services to meet
our clients’ needs. Our professional services include:
• Building Code Services
• Civil Engineering/Roadway and Highway Design
• Coastal Engineering
• Code Compliance
• Construction Engineering and Inspection (CEI)
• Construction Services
• Data Technologies and Development
• Electrical Engineering
• Civil Engineering
• Environmental Services
• Facilities Management
• Geographic Information Systems (GIS)
• Governmental Services
• Landscape Architecture
• Planning
• Project Management
• Redevelopment and Urban Design
• Surveying and Mapping
• Traffic Engineering
• Transportation Planning
• Water/Utilities Engineering
• Website Development
Taking advantage of our diversified staff's experience and
knowledge is what distinguishes CGA as a professional
consultant and what allows our team to repeatedly complete
projects on-time,under budget and exceeding expectations
while doing so.
Serving
Municipalities Throughout Florida
LOCATIONS
Clearwater
Estero
Fort Lauderdale
Miami-Dade
Port St. Lucie
West Palm Beach
FOUNDED IN HOLLYWOOD1937
370
EMPLOYEES
Tab E - Qualification Information and Assigned Personnel
23
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)
Please reference SF330 for the following information:
• SF330 Section E - Resumes of Key Personnel's
experience
• SF330 Section F - Projects for CGA's project
experience
Past Record
CGA has extensive experience in providing consulting
services on a continuing basis to municipal clients. We are
currently under contract with over 60 governmental entities
- many for over 20 years - demonstrating that we continually
provide sustainable high quality services. Client satisfaction
remains our underlying theme and is the most important part
of any statement on past performance.
CGA has assisted the City with a number of projects in
recent years, including Construction Administration of the
Newport Beach Pier, Design and Construction Services for
the North Bay Road Pedestrian Bridge, evaluation of the this
pump station, 174th Street Roadway Improvements, lighting
studies at 174th Street and throughout the Golden Shores
Neighborhood, city-wide speed studies, traffic engineering
services, and engineering plan review services.
Financial Stability
CGA is a financially stable company with the resources to
ensure continued operations throughout the duration of the
contract.
Size of Work Force
CGA maintains a workforce of over 370 professional staff.
The workforce proposed for this project is identified in the
organization chart and resumes in the SF330 form included
at the end of this section.
Availability of Personnel
CGA has sufficient staff to support the projects under this
contract because we serve as municipal staff, and in keeping
with our reputation of being promptly responsive, we ensure
that availability of our staff never goes below 40 percent for
our senior staff and 30 percent for our technical support staff,
amending our staffing needs as necessary. This is a strategy
that we maintain to allow us to meet the impromptu and
unexpected demands of all of our clients without sacrificing
the needs of others. CGA guarantees that we will have the
necessary staff to meet all the needs no matter what they are.
Local Permitting Experience
CGA has extensive experience and knowledge in all applicable
federal, state and local codes, laws and regulations. In
our capacity for providing engineering services to many
local agencies in Miami-Dade and Broward Counties, our
experience and familiarity with regulatory agencies plays
a major role during the project approach, design, and
permitting phases to allow for a more well-coordinated and
smoother permitting process. CGA has been responsible for
ensuring that all codes are met and addressed prior to permit
submittal, which leads to a reduction of agency comments
and limits any project schedule interruption. We have been
a part of countless projects and continuous communication
efforts with regulatory agencies for all aspects of design. Our
familiarity with permitting related to infrastructure projects,
specifically in Miami-Dade County, can be demonstrated
by listing the applicable regulatory agencies and pertinent
codes/criteria which are anticipated to be encountered during
the permitting phase of services.
• City of Sunny Isles Beach Building Department - Dry
Run during design
• South Florida Water Management District -
Dewatering Permit and Environmental Resource
Permits
• Army Corps of Engineers - Environmental Resource
Permit (if work in the intracoastal is needed)
• Florida Fish and Wildlife Commission
• Miami-Dade County Department of Environmental
Resources Management (DERM)
• Florida Department of Environmental Protection
(FDEP) Underground Injection Control Well Permit
• Miami-Dade Public Works Department of
Transportation (MDPWDOT)
• Miami-Dade Water and Sewer Department (WASA)
• Miami-Dade Transit (MDT)
Performance Records
CGA has an exemplary record of performance with each of
its contracts. Company-wide, CGA has never had a contract
terminated or canceled for cause.
The key to effective performance is assigning the right person
for the job. The CGA Team represents a highly qualified and
experienced professional staff with almost every required
discipline in one location. In order to maximize employee
utilization and therefore performance, CGA utilizes an
accounting software, Ajera, to track not only project budgets,
but also employee workloads.
In an effort to maintain the highest standards, our team
receives continuing education to stay on top of the latest
industry standards and processes. Through formal training,
seminars and in-house technical sharing sessions our staff
is kept abreast of ever-changing methods and technology.
24
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)
On Schedule and Within Budget
We have enlisted the most appropriate leader, Jenna Martinetti,
PE, and the best available team members to ensure that the
most economical and technically sound projects are delivered
to the City on time and within budget. We accomplish this by
keeping the channels of communication open among CGA’s
team members and supplementing with regular in-house team
and client progress meetings. Additionally, monthly status
reports are submitted to the City’s PM. This helps ensure
that project milestones are being met as planned as well as
keeping the City ready to answer any commission, resident
or business owner questions. Frequent communication
among the City and the projects manger also allows CGA to
closely monitor project progress, budgets and schedules. We
use progressive communications tools to keep in contact as
various team members undertake different tasks each day.
The full suite of project administration software (Ajera) is
used by CGA’s staff. Whether it is time and budget tracking,
or monitoring schedules and task completion, this system
measures real time task completion and budget status. The
use of conference calls and web-based meeting rooms allow
for frequent and efficient meetings with the City, internal staff,
and sub-consultants.
At CGA, a key exercise for maintaining schedule is performed
in the kick-off meeting by identifying key risk factors. This
involves the complete team and includes each discipline and
responsible team member. We focus on task critical functions
based on each discipline’s knowledge area. The complete
involvement emphasizes schedule awareness and complete
team buy-in. For example, if a potential slip in the schedule
is identified, the Project Manager can address it through
the project’s issues and risk analysis process. Schedule
changes often have downstream impacts and permitting is
always a critical element. Therefore, CGA project managers
are trained to use the schedule as a functional tool and focus
on critical task that impact the final completion timeline.
With the schedule distributed to the team, the project
manager closely tracks individual task and updates project
progress. If circumstances occur that have the potential to
cause delays, the project manager is authorized to assign
more resources to the project. If delays are permitting or
administrative in nature, the project manager will revise the
schedule considering the potential risk of continuing forward
with a design without final project approval. Such a situation
will be presented to the City to determine if the delayed tasks
can proceed based on the anticipated outcome of the third
party approvals processes. The CGA Team understands that
a schedule is intended not only for the consultant, but also for
the City to coordinate their resources for reviewing submittals
and for reporting to other City staff and Departments.
The CGA PM and team is equipped to handle projects
varying in nature and timeline. The CGA team structure
and experience allow for simultaneous execution of multiple
projects or project tasks as well as fast-tracking or expediting
projects. CGA cross-trains our project managers and task
leaders to gain critical experience in multiple areas of civil
engineering. By doing this, we enable multiple project teams
to work concurrently on the same project. This allows for
undertaking separate tasks for one project on parallel tracks
or multiple projects at the same time. Additionally, the CGA
CADD team and junior engineering staff are well-rounded
and work for project managers across the civil engineering
disciplines, ranging from water and wastewater to roadway
and parks design. While the organizational chart shows
certain employees under specific categories, plans production
and project management functions are similar across the
disciplines; so our engineering staff is able to work across
disciplines, as needed to expedite the completion of projects
or tasks. Project timelines depend on the complexity of the
project, the permitting requirements, and external factors
such as grant deadlines and agency review times. Pulling
more resources, performing tasks simultaneously, permitting
awareness and superb subconsultant coordination are
mechanisms for reducing the overall schedule for a project,
if needed.
The approach to controlling project budgets, another
important management technique, is to identify if the budget
is sufficient for the scope of work being requested at the
beginning of a project and track the budget throughout the
lift of the project. CGA will work with the City to understand
the basis of the budget number to help ensure that additional
scope is not added without consideration on how this affects
the budget. With each design milestone, cost estimates will
be prepared for comparison to the budget. The unit prices in
the cost estimates are constantly being updated with the best
available information at that time and are subject to change
even when additional scope is not added due to variation in
the construction industry. If a project is in jeopardy of being
over budget, immediate attention is provided to address why
and determine what steps need to be taken.
25
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)
Another method of cost control during construction is CGA’s
multidisciplinary constructability review as part of our
Quality Assurance/Quality Control process. This process
consists of a peer review process where a design group
not directly involved with the project will review the plan
documents with a fresh perspective. Once the comments
have been addressed, the plans are submitted to the firm’s
Director of Engineering for final sign off before being released.
The multi-disciplined review process also consists of a
constructability review by a member of the CEI or construction
services department. This review specifically ensures that
the plans make sense from a construction perspective
and is intended to minimize potential problems in the field
during construction. Once the client and regulatory agencies
approve the final design, the construction documents will be
finalized and submitted to the City for bidding.
All of the team members and subconsultants team members
have worked with Mrs. Martinetti on previous projects.
Subconsultant coordination is streamlined by group emails
and frequent meetings, as noted above, to be sure they are
on track with task completion and moving in the intended
directions. The proposed team has collaborated and will
continue to collaborate effectively and efficiently under her
leadership.
Our team understands the needs of the City and is fully
capable of delivering all the services required for the
planning, design, permitting and construction services
relating to this contract. Additionally, the CGA team has
experience with assisting municipalities in obtaining grants
or executing projects funded by grants with specific time
constraints or reporting requirements. We have successfully
completed projects funded by Local Agency Project (LAP)
funding, FEMA Hazard Mitigation Grant Program (HMGP)
funds, Florida Inland Navigation District (FIND) grants,
County Incentive Grant Program (CIGP), Community Block
Grant (CBD), State Revolving Funds (SRF) and others. CGA
has recently completed the design on multiple LAP projects,
meeting the FDOT imposed LAP schedule and requirements
from their checklists. We have also been involved with the
applications for House and Senate Appropriations including
filling out the forms, providing technical back-up and working
on the project design.
The keys to success of every project will be keeping the City
Staff informed with efficient communication, experienced and
responsive technical staff, and innovative, value- engineering
design. Whether plan review, technical resource staffing or
project specific assignments are required, the CGA team has
the experience and dedication necessary to produce superior
results. Our emphasis on teamwork and quality control
allows us to consistently exceed our clients’ expectations.
We are ready and motivated to perform on this contract, and
have a high level of availability.
Location of Office Where Work will Be Performed
1800 Eller Drive, Suite 600, Fort Lauderdale, FL 33316
SF330 Part I and II
Please reference the following pages for CGA's and our
subconsultants SF330 Part I and II.
Licenses and Certifications
CGA is licensed to do business in the State of Florida. After
the SF330 section, you'll find copies of licenses and/or
certifications for CGA, key personnels, and subconsultants.
26
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)27
(Complete this section for the prime contractor and all key subcontractors.)
STANDARD FORM 330
ARCHITECT - ENGINEER QUALIFICATIONS
PART I - CONTRACT-SPECIFIC QUALIFICATIONS
A. CONTRACT INFORMATION
B. ARCHITECT-ENGINEER POINT OF CONTACT
D. ORGANIZATIONAL CHART OF PROPOSED TEAM
C. PROPOSED TEAM
9. FIRM NAME
(Check)PRIMEJ-V PARTNERSUB-CONSULTANT11. ROLE IN THIS CONTRACT
1. TITLE AND LOCATION (City and State)
2. PUBLIC NOTICE DATE
4. NAME AND TITLE
5. NAME OF FIRM
6. TELEPHONE NUMBER 7. FAX NUMBER 8. E-MAIL ADDRESS
3. SOLICITATION OR PROJECT NUMBER
CHECK IF BRANCH OFFICE
CHECK IF BRANCH OFFICE
CHECK IF BRANCH OFFICE
CHECK IF BRANCH OFFICE
CHECK IF BRANCH OFFICE
CHECK IF BRANCH OFFICE
(ATTACHED)X
10. ADDRESS
a.
b.
c.
d.
e.
f.
STANDARD FORM 330 (REV. 8/2016) - SF330-A ThRu C_CGA
Continuing Professional Consulting Services (CCNA)
July 8, 2020
Sarah Sinatra Gould, AICP
Calvin, Giordano & Associates, Inc.
954.921.7781 954.921.8807 Marketing@CGAsolutions.com
20-07-01
Planning Director
Calvin, Giordano &
Associates, Inc.X
1800 Eller Drive
Suite 600
Fort Lauderdale, FL 33316
PRIME CONSuLTANT:
Civil Engineers, Electrical Engineers, Surveyors
and Mapping, Environmental Engineering, and
Construction Engineering and Inspection (CEI)
Services
Alan Gerwig & Associates,
Inc.X
12798 W. Forest hill Blvd.
Suite 201
Wellington, FL 33414
SuB-CONSuLTANT
Structural Engineering Services (as-needed)
Chrome Engineering, Inc.
X
16650 N. Kendall Drive
Suite 205
Miami, FL 33196
SuB-CONSuLTANT
Structural Engineering for CEI services
Nutting Engineers of Florida,
Inc.X
2051 NW 112 Avenue
Suite 126
Miami, FL 33172
SuB-CONSuLTANT
Geotechnical Services (as-needed)
Tierra South Florida, Inc.
X
2765 Vista Parkway
Suite 10
West Palm Beach, FL 33411
SuB-CONSuLTANT
Geotechnical Services for CEI (material testing)
uS utility Potholing & Air
Excavation (uSuPAE)X
4630 NE 11th Avenue
Oakland Park, FL 33334
SuB-CONSuLTANT
Utility Designation Utility Potholing SUE
28
D. ORGANIZATIONAL CHART OF PROPOSED TEAM
STANDARD FORM 330 (REV. 8/2016) - SF330-D_CGA_ORG ChART
Professional
Services Key Personnel Firm
Civil
Engineering
Overall Project Manager - Jenna Martinetti, PE; James Messick, PE; Mohammed
Sharifuzzaman, PE; Nicholas W. Kanelidis, PE; Heidi Belle Handerson, PE
Principal-in-
Charge Sarah Sinatra Gould, AICP
Surveying and
Mapping Project Manager for Surveyors and Mapping - Steve Watts, PSM; Pablo Dominguez
Electrical
Engineering
Project Manager for Electrical Engineering - Jorge Cervantes, PE; Julio E. Gonazalez,
PE; Katharine Kupsky
Environmental
Engineering
Project Manager for Environmental Engineering - Sandra Lee, AICP CEP, CFM, LEED
AP BD+C; Drew Lindemann
Construction
Engineering and
Inspection
Project Manager for CEI - Mohamed Mabrouk, PE; Erik Padron, PE; Hugo DaSilva, PE;
Felix Garcia, PE; Bernnon Artola; Erin Sudman; Reynaldo Alfonso; Lance Robinson;
Gary Craig; Julio Antonio; Victor Murphy; Reza Shams
Landscape
Architecture
(as-needed)
Tammy Cook-Weedon, PLA, LEED AP BD+C; Gianno Feoli; Michael D. Conner,
ASLA, PLA, ISA; Marcos Mendoza, Maria A. Alonso, NCIDQ, ASID, ASLA; Dominic
James Mack III, Assoc. ASLA
Geotechnical
(as-needed)Subconsultant: Richard Wohlfarth, PE; Stephen Mrachek
Geotechnical for
CEI (as-needed)Subconsultant: Raj Krishnasamy, PE; Kumar Vedula, PE; Francois Thomas, PE
Structural (as-
needed)Subconsultant: Alan Gerwig, PE; Simon Coleman, PE; Donald Beers, PE
Structural for
CEI (as-needed)Subconsultant: Oscar J. Cruz, PE; Jorge A. Canales, PE; Gregory P. Dover, PE
SUE (as-
needed)
Subconsultant: Robert Charles “Chuck” R. Faust, Jr.; Juan Rivera; Marvin Parkins;
Michael Murphy; Aagie Monteleone
Additional In-
house Support
Services
Construction Administration; Estimating & Budgeting; Traffic Engineering;
Planning; Geographic Information Services; Website Development
29
c.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete One Section E for Each Key Person.)
12. NAME
16. EDUCATION (Degree and Specialization)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
15. FIRM NAME AND LOCATION (City and State)
13. ROLE IN THIS CONTRACT
a. TOTAL b. WITH CURRENT FIRM
14. YEARS OF EXPERIENCE
19. RELEVANT PROJECTS
a.
b.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 SARAh SiNATRA GOulD
SARAH SINATRA GOULD, AICP
Calvin, Giordano & Associates, inc.
Masters in urban & Regional Planning AiCP
B.A. in Political Science
Fort Lauderdale, FL
Florida Atlantic University No. 158802
Florida Atlantic University
Mrs. Gould has over 16 years of planning experience including municipal planning director duties such as processing zoning requests, land
use plan amendments, site plan reviews, plats rezoning petitions, variances, vacation/abandonments and all other development application
reviews. She holds a Master in Urban and Regional Planning from FAU. Mrs. Gould has also written evaluation and appraisal reports,
comprehensive plans and zoning and land development codes. She is experienced in writing form- based codes and transit-oriented zoning
codes. As the Planning Department Director for Calvin, Giordano & Associates, she acts as the Director of Development Services for the City
of Weston and the Town Planner for North Bay Village. For those entities, she carries out day-to-day planning and zoning activities, presents
staff reports and recommendations to the commissions, the planning and zoning boards and provides customer service assistance to
residents, developers and business owners.
PLANNING 16 15
Town of Surfside Planning Department
Surfside, Florida
Respond to zoning calls from the public. Created the development review process for the Town and chair the development review group
meetings. Review zoning permits and prepare items for the Design Review Board Meeting. Present site plans and permits to the Design
Review Board, which analyze architectural and design standards in completing the review. Complete development reviews including site
plans, plats, variances, special exceptions, land use plan amendments and rezoning applications. Prepare all staff memorandums and
present the items to the Planning and Zoning Board and the Town Commission.
2006 - 2020
Surfside Zoning Code
Surfside, Florida
CGA prepared a form based inspired code for the entire Town, where a strong relationship was built between building heights and land
uses. The focus of the community was to protect the character of the 1 and 2 story residential areas. While the Town wanted a form base
approach, they also wanted to maintain control of more conventional zoning parameters, such as setbacks. CGA was able to develop a
form base code that achieved these goals while providing for the conventional controls the Town required.
2010
Director of Development Services
Weston, Florida
Process development review applications including site plans, plats, variances, special exceptions, land use plan amendments and
rezoning as well as managing the Planning and Zoning Department. Prepare items for the Development Review Committee (DRC) and the
City Commission by chairing the DRC meeting, preparing the staff memorandum to the City Commission and presenting the application
to the City Commission.
2018
30
h.
19. RELEVANT PROJECTS (CONT.)
f.
e.
d.
g.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 SARAh SiNATRA GOulD
EAR and EAR Amendments
Surfside and Weston, Florida
Town of Surfside EAR and EAR Amendments: Updated to meet changes in the Florida Statutes and included a focus on sustainability
and resiliency.
City of Weston EAR and EAR Amendments: Updated the Comprehensive Plan to meet Florida Statute requirements. Focus on
redevelopment.
2007 & 2017
Consulting Planner
Cutler Bay, Florida
Provide development review services to the Town. Review development applications including site plans, land use plan amendments,
variance and rezoning applications. Prepare staff memorandums and present the items to the Town Council.
Town Planner
Village of North Bay Village, Florida
Provide development review services to the Village. Review development applications and requested zoning code amendments. Prepare
staff memorandums and present the items to the Planning and Zoning Board and Village Commission.
Collins to harding Corridor Analysis
Surfside, Florida
Prepared an analysis and zoning criteria to help guide future development into the desired development pattern. Including a comparison
of existing conditions ,a review of traffic engineering standards, impacts to existing buildings and strategies for potential non-conformities
design criteria for pedestrian walkways and new zoning criteria.
2015
General Planning
Medley, Florida
Process development review applications including site plans, plats, variances, special exceptions, land use plan amendments and
rezoning. Prepare items for the Development Review Committee (DRC) and the Town Council by chairing the DRC meeting, preparing the
staff memorandum to the Town Council and presenting the application to the Town Council.
31
c.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete One Section E for Each Key Person.)
12. NAME
16. EDUCATION (Degree and Specialization)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
15. FIRM NAME AND LOCATION (City and State)
13. ROLE IN THIS CONTRACT
a. TOTAL b. WITH CURRENT FIRM
14. YEARS OF EXPERIENCE
19. RELEVANT PROJECTS
a.
b.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 JeNNA MARTiNeTTi
JENNA MARTINETTI, PE
Calvin, Giordano & Associates, inc.
B.S., Civil engineering, Magna Cum Laude Professional engineer Florida
Fort Lauderdale, FL
Florida State University, Tallahassee, FL No. 69035
Ms. Martinetti has over 16 years of engineering experience designing and managing projects within many local municipalities. Her roadway
design experience includes design for milling and resurfacing, widening, roadway reconstruction, safety improvement projects, neighborhood
enhancements, ADA upgrades and compliance, drainage improvements, signing and pavement markings, traffic control plans, storm water
pollution prevention control plans and complete streets incorporation. Her experience also includes utility coordination, participation in the
quality control process, and local agency program (LAP) coordination, including agency certification assistance. She has the advanced
maintenance of traffic certification required to design and permit traffic control plans and has extensive experience with JPA’s and LAP projects
including Transportation Enhancement Program and CIGP. Her project management experience also includes design and retrofit of parks,
roadways, water mains, sewage force mains, lift stations, fuel station, site development and design, neighborhood improvement projects, and
stormwater projects as well as permitting, bidding documents, engineering during construction and project close-out.
OVERALL PROJECT MANAGER 16 16
Nova Drive Complete Streets improvements Project
Davie, Florida
Project manager and engineer of record for Nova Drive, from Davie Road to east of University Drive, to widen a portion of the corridor
from 2 lanes to 4 lanes and implement complete streets initiatives including reducing lane widths, traffic calming measures such as a
roundabout, adding bike lanes and sharrows, upgrading signalization, pedestrian improvements, signing and pavement marking plans,
MOT, drainage modifications, lighting, and tree removal/relocations. This project is grant funded and almost complete with construction.
A major FPL relocation was necessary in order to construct the new roundabout. 2014-Present, Senior Project Manager, Previous Town
Engineer: Jonathan Vogt, PE (954) 797-1137. Construction Cost: ($6.9M), Firm Fees: $459,475
2014 - Ongoing 2020
Broad Causeway LAP Project
Bay Harbor Islands, Florida
Senior project manager for design and construction document preparation for adding a paved shoulder to the Causeway and replacing
the pedestrian handrail along the waterways bridge. The project is an FDOT Local Agency Program (LAP) funded project requiring
coordination and submittals to FDOT D6, including using their electronic review comment (ERC) system, as required due to the federal
funding. Assisting the Town with their LAP Certification process is also included.
2017 Ongoing
Rickenbacker Causeway
Miami-Dade County, Florida
In-house project manager as a sub-consult for the design build team with Kiewit Construction for the rehabilitation of the Rickenbacker
Causeway’s West Bridge and the rehabilitation and expansion of the Bear Cut Bridge. CGA’s scope included hydrographic and topographic
survey, drainage design, lighting, and signing and pavement markings. The Bear Cut Bridge was widened to accommodate a protected
multi-use path in both directions and an 8’ bike lane adjacent to traffic in both directions as well as improvements to both approaches
requiring coordination with two of the County’s adjacent future projects. The existing cross slope and bridge deck structure were modified
impacting the existing drainage and requiring permits through Miami Dade County’s Regulatory & Economic Resources Department and
South Florida Water Management District. CGA coordinated the bridge circuits during construction as well as providing new lighting for
the widened bridge and new multi-use paths.
2013 - 2014 2014
32
h.
19. RELEVANT PROJECTS (CONT.)
f.
e.
d.
g.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 JeNNA MARTiNeTTi
Fronton Boulevard improvements
Dania Beach, Florida
Senior Project Manager for the improvements to Fronton Boulevard in order to upgrade the existing Jai-alai facility to accommodate a
casino. Redesign of this City owned roadway was required as part of the developer’s agreement with the City. Upgrades on Fronton Blvd
were accomplished by alignment changes in order to add a median as well an additional southbound lane, new parking for the adjacent
park, and two new right turn lanes and entrances to the facility. Design, permitting, and construction services for the improvements
as well as new offsite water mains on Fronton Blvd, SR A1A/Dania Beach Blvd and NE 2nd Street; overall coordination of utilities; and
drainage design to accommodate the roadway improvements was performed. Construction Cost - $3.1 Million, Professional Fees -
$766,000
2013 - 2016 2016
Davie Road Phase ii Corridor enhancements
Davie, Florida
Senior PM for design of Davie Road from Nova Drive to SW 39th Street. The scope includes adding bike lanes and a landscaped median
within the existing 5 lane pavement section, widening of the sidewalks, ADA upgrades, signalization upgrades, signing and pavement
marking plans, MOT, drainage modifications, lighting, and tree removal/relocations. The project is an FDOT Local Agency Program (LAP)
funded grant project requiring coordination and submittals to FDOT, including following their utility coordination process. Post Design
services for this federally funded project required close coordination with the FDOT and CEI team.
2015 - 2018 2018
Rolling Oaks Park
Miami Gardens, Florida
Senior civil project manager for the design and construction of an ADA-compliant pedestrian trail and associated retention areas
within Rolling Oaks Park. Wayfinding signage and ADA ramps were provided at the intersections along a route through the surrounding
neighborhood to connect the new trail in the park to an existing walking trail in the Dolphin Center Park, which is located three quarters
of mile away. In addition, the existing drainage permit for the master site plan had to be modified to account for the proposed trail
improvements. These new drainage facilities were carefully planned to avoid removing any trees as well as limit impacts to the future
master plan for the park. The design for the trail included new outdoor fitness stations, seating areas, LED site lighting and custom-
designed way-finding signage for all of the trailhead signs, directional signs, and mile markers.
2012 - 2015 2015
Davie Road Phase i Roadway improvements
Davie, Florida
Senior project manager for Davie Road Phase 1, from SR 84 to Nova Drive. The scope included widening Davie Road from a 5 lane
section to 6 lane divided roadway with bike lanes, upgrading signalization and signing and pavement markings, traffic control plan,
ADA upgrades, new sidewalks and pedestrian enhancements, drainage modifications, new lighting, a new landscaped median, and tree
removal/relocations. This project is partially funded by a County Incentive Grant (CIGP) and required extensive coordination for a Town
project on a County owned roadway.
2013 - 2016 2016
SR 870/Commercial Boulevard, FDOT District iV
Tamarac, Florida
Project manager for the design, permitting and post design services for this FDOT RRR project. The scope includes milling and resurfacing,
signing and pavement markings, signalization and lighting upgrades at two intersections, ADA upgrades, safety improvements, traffic
monitoring sites, and utility coordination. Phase 1 was complete in 2014 and Phase 2 was completed in 2016.
2011 - 2016 2016
33
h.
19. RELEVANT PROJECTS (CONT.)
f.
e.
d.
g.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 JeNNA MARTiNeTTi
Water Main Replacement on Ne 2nd Avenue
Dania Beach, Florida
Engineer of Record for the replacement of about 7,000 LF of 12” water main plus some 4-inch, 6-inch, and 8-inch water main with tie
ins in a residential neighborhood including replacing all water services, connections to the existing main, and fire hydrants.
2020 - Ongoing
Hallandale Beach SW Quadrant Drainage improvements
Hallandale Beach, Florida
Senior Project Manager for major enhancements to the existing drainage system within the City’s SW Quadrant to reduce the flooding
during large storm events by isolating the system from tidal influence and pumping the stormwater into proposed injection wells. The
project includes the construction of a new pumping station with two (2)- 350 HP pumps and an automated trash rack, storm water force
mains, seventeen (17) injection wells, a control structure consisting of four (4) flap gates and one sluice gate, an 800 kW generator, an
intelligent controls and monitoring system and landscaping enhancements in areas affected by construction This project is funded by
FEMA HMGP grant funds. Client: Manga Ebbe. (954) 457-3042. Construction Cost: $9.6 million, Firm Fees: $782,395.
2014 - Ongoing
Dania Casino and Jai-Alai Off-site Water Main Upgrades
Dania Beach, Florida
Senior Project Manager for design for the onsite and offsite improvements required to upgrade the existing Jai-alai facility to accommodate
a casino. As part of the developer’s requirement with the City and the demand of the upgraded facility, new water distribution lines
surrounding the site area were required to be installed. Design and permitting for 1570 LF of 8” pipeline, 1270 LF of 12” pipeline, new
fire hydrants both onsite and offsite, and multiple new service and irrigation connections for the project site. City, Health Department
and FDOT permitting and certifications were required for the new water main. Client Reference: F3 Architecture, Joaquin Gerlero. Water
owner/supplier: City of Dania Beach
2013 - 2016 2016
Windmill Park
Coconut Creek, Florida
Senior Project Manager for the design of a 14 acre redevelopment to an existing park. Subconsultant to the architect for the site design
modifications including ADA sidewalks, exercise stations, a new parking lot and parking lot improvements, pavement marking and
signage, stormwater management, grading, stormwater pollution prevention, and utilities modifications to accommodate a reconstructed
office building and dog park.
2015 - 2017 2018
Dania Cove Park improvements
Dania Beach, Florida
Project manager for the design and installation of park improvements including a pedestrian pathway, 2 picnic pavilions, benches,
picnic tables, educational and entrance signage, and trash receptacles for Dania Cove, aka Fuzzy Bunny Park, in Dania Beach. The city
needed design, permitting and construction completed in 13 months in order to meet the deadline for two separate grants funding the
project. The project also included shoreline restoration using sheet pile wall, environmental and stormwater permitting, site grading,
grant administration, and landscaping improvements. The project was completed in time for the City to receive the entire grant funding
available for reimbursement.
2010 - 2012 2012
34
c.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete One Section E for Each Key Person.)
12. NAME
16. EDUCATION (Degree and Specialization)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
15. FIRM NAME AND LOCATION (City and State)
13. ROLE IN THIS CONTRACT
a. TOTAL b. WITH CURRENT FIRM
14. YEARS OF EXPERIENCE
19. RELEVANT PROJECTS
a.
b.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 JAMeS MeSSick
JAMES MESSICK, PE
calvin, Giordano & Associates, inc.
B.S., civil engineering Professional engineer Florida
Fort Lauderdale, FL
University of Dayton, Dayton, OH No. 70870
Mr. Messick’s experience includes both the private and public sectors of civil engineering. Responsibilities include studies and design for large
scale stormwater management systems, along with the permitting of stormwater management systems, and local roadway improvements
sewage collection and transmission systems, water distribution systems, utilities for general site development for private/public engineering
projects, design of septic/lift stations to obtain permits from agencies such as Miami-Dade County WASD, FDEP, FDOH, and FDOT along
with applicable South Florida counties, municipalities and local agencies, along with detailed experience with engineering services during
construction.
ENGINEER 15 6
city center Parking Lot
Pembroke Pines, Florida
As Engineer of Record and Project Manager, Mr. Messick was the lead designer for parking lot to serve future City Center development
in the City of Pembroke Pines, Florida. Parking lot modifications included driveway connectivity and roadway relocation to provide ease
of access and reduce impacts from existing FPL transmission lines and associated power poles throughout previously permitted design.
Project includes modifying drive aisles locations, parking lot reconfiguration, ADA accessibility, pavement marking and signage, and
drainage modifications to proposed parking lot project.
2014 - 2015 2016 - 2018
Hallandale Beach SW Quadrant Drainage improvements
Hallandale Beach, Florida
Mr. Messick was Engineer of Record for this project which includes major enhancements to the existing drainage system within the City’s
SW Quadrant to reduce the flooding during large storm events by isolating the system from tidal influence and pumping the stormwater
into proposed injection wells. The project includes the construction of a new pumping station with two (2)- 350 HP pumps and an
automated trash rack, storm water force mains, seventeen (17) injection wells, a control structure consisting of four (4) flap gates and
one sluice gate, an 800 kW generator, an intelligent controls and monitoring system and landscaping enhancements in areas affected
by construction. The new wells will be pressurized with fifteen (15) feet of head in order to produce the necessary discharge into the
G3 aquifer. FDEP, ACOE, and the Broward County Environmental Resource Department have permitted the project. Bidding Services and
Construction Administration Services are also being provided by CGA. This project is funded by FEMA HMGP grant funds.
2016 - 2018 2018 - Ongoing
Professional Services
Bal Harbour Village, Florida
Mr. Messick is the Client Manager and main liaison for overseeing ongoing professional services to the Bal Harbour Village. This Continuing
Engineering Service Agreement which began in 2017 allows CGA to provide assistance in various projects and plan review services
including Civil Engineering, Electrical Engineering, Surveying, GIS, and Construction Services. Services include Building Department
Public Works and Utilities plan reviews, Sunshine 811 Services management, FDEP Annual Reporting for NPDES, Miami-Dade County
MS4 TMDL Prioritization Plan & Assessment Plan and Department of Regulatory & Economic Resources Reporting – Sanitary Sewer
System Modeling and Water Usage Reporting, and GIS Database Verification and Updates. This agreement also allows design services
under the CCNA including engineering studies, cost estimating, water and/or sewer main improvements, storm water management or
drainage system improvements, roadway reconstruction, and associated construction inspection.
01/2019-Ongoing Ongoing
35
h.
19. RELEVANT PROJECTS (CONT.)
f.
e.
d.
g.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 JAMeS MeSSick
Bid Pack 8
Oakland Park, Florida
Project Engineer for the water and sewer improvements project located within the City of Oakland Park. Design included approximately
18,000 linear feet of water main replacement, rehabilitation of lift station B-1 and installation of 4 sewer combination air valves (SCAV)
to alleviate compressed air within the City’s sanitary sewer force main system. Project was bid in summer of 2016 and construction
completed in early Summer 2019.
2013 - 2018 N/A
Lloyd estates
Oakland Park, Florida
Mr. Messick assisted with the lift station outparcel for an improved stormwater management system to aid in the reduction of flood
duration and elevation during storm events within the Lloyd Estates neighborhood. The improvements included a bioswale and typical
driveway design. Grant services were provided for this project that resulted in approximately $4 Million of funding from the FEMA Hazard
Mitigation Grant Program.
2014 - 2015 2015 - 2016
Boca Sewer Manhole Replacement
Boca Raton, Florida
Mr. Messick served as the Engineer of Record for the City of Boca Raton Sewer Manhole Replacements project. Due to the presence of
unsuitable soils and inadequate maintenance over the years, Mr. Messick’s design included replacement of several existing manholes
at two project sites. Mr. Messick oversaw Surveying, Civil Engineering, and Construction Administration services, which incorporated
doghouse structures to relieve extended by-pass pumping and dewatering activities during construction. Permits were obtained from Palm
Beach County Health Department and Engineering Departments for the approximately 20 feet deep gravity sewer mains. Construction
commenced in December 2019 and was completed in early 2020.
2019 2020
Dania Jai Alai
Dania Beach, Florida
Mr. Messick is the project engineer for the design and coordination of the proposed water and sewer improvements for this multi-phased
project located in Dania Beach, Florida. The scope of work includes modeling of water and sewer utilities, and design for both on-site
water and gravity sewer mains, and offsite lift station and sanitary sewer force main with a connection to the City of Dania Beach owned
lift station #6. Pressure test data collection was conducted to assist in lift station design, and project was permitted and construction
completed in 2016.
2014 - 2016 2016
Natalie’s cove Drainage improvements
Cooper City, Florida
As Engineer of Record and Project Manager, Mr. Messick was in charge of complete drainage improvements to this local neighborhood in
the City of Cooper City, Florida. After a basin wide drainage analysis, it was determined that significant improvements to level of service
may be achieved by increasing conveyance pipe sizes from adjacent neighborhoods to existing stormwater management system.
In addition to pipe upsizing, project includes increasing lake storage by the donation of wetland creation along eastern lake bank,
roadway milling and resurfacing and ADA compliance for all surrounding pedestrian sidewalks. Permitting were completed to both South
Florida Water Management District and Central Broward Water Control Districts for modifications to existing drainage permits, with a
construction completion date of Spring 2020.
2013 - 2018 2018 - 2020
36
h.
19. RELEVANT PROJECTS (CONT.)
f.
e.
d.
g.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 JAMeS MeSSick
Memorial Hospital South Solarium
Hollywood, Florida
Project Engineer for the construction a solarium addition to the existing Memorial Hospital South facility located in Hollywood. Design of
the solarium included an ADA accessible entrance, drainage modifications, parking lot reconfiguration, along with pavement marking and
signage improvements for the existing facility.
2014 - 2015 2015 - 2016
YMcA Homestead Drainage improvements
Homestead, Florida
Project engineer for the design and coordination of the proposed stormwater improvements for the Homestead YMCA site located in
Miami-Dade County, Florida. Scope includes design of drainage improvements to the existing stormwater management system to prevent
localized flooding of existing daycare facility and adjacent gymnasium. Bids were opening in September 2014. Due to the request for
additional drainage improvements, YMCA was able to obtain additional funds from the City of Homestead, which finished drainage
improvements in Summer of 2017.
2016 2017
Basin 5 Stormwater Master Plan, Phase ii
Dania Beach, Florida
Project manager for initial design and permitting for the improvements contained in the recommendation of the Storm Water Master
Plan of Basin 5, Phase II in the Dania Beach, Florida. Project consists of three duplex pump stations, more than 20,000 linear feet of
high capacity storm sewer improvements to improve storm water conveyance, increase of discharge outfall structure efficiency and
exfiltration trenches to improve area water quality. Mr. Messick leads to redesign of this project to provide a bio-swale located on county
maintained tidal intercostal West Lake Park, and will reduce storm stages with the construction of the three duplex pumps. Phase II
includes verifying existing utilities are not in conflict and providing upgrades to several intersections to meet ADA criteria.
2009 - 2015 N/A
Three island Reuse Water Pipeline
Hallandale Beach, Florida
Mr. Messick is the Engineer of Record for this project which includes improvements to the existing reuse pipeline and pump station
improvements project in the City of Hallandale Beach, FL. The proposed pipeline will provide City of Hollywood reuse effluent stored in an
existing underground tank, which is then pumped to the proposed landscaped median improvements within the Three Islands Boulevard,
Parkview Drive, and Leslie Drive Roadways. The project includes the construction of approximately 4,500 LF of new 8” reuse water
main, one directionally drilling portion under existing canal crossing, connections to median landscape islands, replacement of two new
pumps to meet the increased demand of irrigation. FDEP and the Broward County Environmental Resource Department permits will be
obtained for these improvements. Bidding Services and Construction Administration Services are also being provided by CGA. Project is
currently slated for construction in fall of 2020.
2020 - Ongoing Future
Raw Water Pipeline
Hallandale Beach, Florida
Project Engineer of Record for the raw water pipeline project located within the City of Hallandale Beach. Design included approximately
2,776 linear feet of 12” DIF raw water main, connection to existing raw water system, and the installation of a combination air release
valve to alleviate compressed air or vacuum conditions within the City’s raw water force main. The raw water upgrades include isolated
ADA and sidewalk improvements and school crossing signage improvements to meet BCTED requirements. Geotechnical investigations
concluded that a portion of the main construction will need to be remediated to prevent future settlement along the proposed pipeline.
Project is currently slated for construction in Summer of 2020.
2019 - 2020 Future
37
c.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete One Section E for Each Key Person.)
12. NAME
16. EDUCATION (Degree and Specialization)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
15. FIRM NAME AND LOCATION (City and State)
13. ROLE IN THIS CONTRACT
a. TOTAL b. WITH CURRENT FIRM
14. YEARS OF EXPERIENCE
19. RELEVANT PROJECTS
a.
b.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 MOhAMMeD ShARRiFuzAMAN
MOHAMMED SHARIFUZZAMAN, PE
Calvin, Giordano & Associates, inc.
M.e., Civil engineering, 2000 Professional engineer Florida
B.S., Civil engineering, 1997
Fort Lauderdale, FL
Lamar University, Beaumonth, TX No. 67640
Bangladesh University of Engineering & Technology, Bangladesh
Mr. Sharifuzzaman has more than 17 years of professional experience in civil, environmental, and transportation engineering with specialization
in hydraulics and hydrologic modeling (H&H), surface water management system design, drainage basin/watershed modeling and floodplain
analysis, master drainage study, conceptual/master surface water management system design, stormwater pump station design, stormwater
retrofit projects, nutrient loading analysis (TMDL calculations), Stormwater Treatment Area (STA) design, FDOT roadway drainage design, and
bridge hydraulics. His extensive experience includes land development projects including commercial/residential/institutional/DRI projects,
roadway projects including new construction, widening and reconstruction, RRR and safety improvement projects, and PD&E study. He
has worked extensively with permitting agencies including the SFWMD, FDEP, FDOT, USACE, various municipalities, and counties. His
trusted reputation with the permitting agencies has produced a long list of successful and profitable projects. His extensive experience with
construction, and thorough knowledge of codes and regulations as they apply to each development, is an asset for any project.
ENGINEERING/PERMITTING 17 7
engineering/Permitting Services
Dania Beach, Florida
Review of site plans, engineering plans, engineering design documents for various projects in the City of Dania Beach as part of the City’s
development services and permitting review process.
Ongoing
engineering/Permitting Services
Sunny Isles Beach, Florida
Review of site plans, engineering plans, engineering design documents for various projects in the City of Sunny Isles Beach as part of
the City’s development services and permitting review process.
Ongoing
Surfside Abbott Avenue Drainage Study
Surfside, Florida
Responsible for drainage design including watershed modeling of Town of Surfside master drainage system, determination of probable
cause of flooding, determination of most feasible and optimum drainage improvements to minimize the potential for future flooding. The
proposed drainage improvements included up-sizing of conveyance pipes, stormwater pump stations with pressurized drainage wells.
2018 N/A
38
h.
19. RELEVANT PROJECTS (CONT.)
f.
e.
d.
g.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 MOhAMMeD ShARRiFuzAMAN
engineering/Permitting Services
Weston, Florida
Review of site plans, engineering plans, engineering design documents for various projects in the City of Weston as part of the City’s
development and permitting review process.
Ongoing
Flamingo Gardens Master Drainage Study
Cooper City, Florida
Modeling of 135-acre Flamingo Gardens Master Drainage Basin to determine the potential cause of neighborhood flooding and
determination of the most feasible drainage improvements to minimize future flooding. Performed drainage analysis, calculations,
modeling, alternative improvements and cost/benefit analysis.
2014 2019
Oak Grove Park
Miami-Dade County, Florida
Design of pedestrian/bike path, boat ramp, fishing piers, picnic areas/shelter, on-street parking along SW 70 Avenue, and a restroom
facility with water main and gravity sewer main extension.
2013 2013
Nova Drive improvements
Davie, Florida
Responsible for drainage design including modification of existing stormwater management system, analysis and modeling of “Basin
A” of Tindall Hammock Irrigation and Soil Conservation District (THISCD), integration of Nova Drive drainage system with THISCD rock
pit drainage system, integration of Nova Drive system with existing CBWCD canal systems and College Avenue Drainage System . The
proposed project scope includes upgrading of the existing roadway to a four lane divided roadway along with turn lanes, driveway
access, and roadway intersection improvements.
2014 2019
engineering/Permitting Services
Town of Belleair, Florida
Review of site plans, engineering plans, engineering design documents for various projects in the Town of Belleair as part of the Town’s
development and permitting review process.
Ongoing
39
m.
19. RELEVANT PROJECTS (CONT.)
k.
j.
i.
l.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 MOhAMMeD ShARRiFuzAMAN
Davie Road Phase i improvements
Davie, Florida
Responsible for drainage design including modification of existing stormwater management system, analysis and modeling of “Basin A”
of Tindall Hammock Irrigation and Soil Conservation District (THISCD), integration of Davie Road drainage system with THISCD rock pit
drainage system. Project scope included widening of the existing roadway to a six lane divided roadway along with turn lanes, driveway
access, and roadway intersection improvements from south SR 84 to Davie Road.
2013 2017
Patch Reef Park Artificial Turf
Greater Boca Raton Beach & Parks District, Florida
Responsible for design and permitting for Patch Reef Park recreational development which includes three large synthetic turf athletic
fields along with site drainage system improvements, irrigation, and related water and wastewater infrastructure improvements.
2017 2019
hallandale Beach Stormwater 42 Year CDBG
Hallandale Beach, Florida
Responsible for design and permitting for the Hallandale Beach Stormwater 42 Year CDBG project. The proposed drainage improvements
included additional catch basins, exfiltration trench and conveyance pipes that will drain through the existing outfalls into the existing
retention lake reducing road flooding and flood duration.
2016 2018
Lloyd estates Drainage Study
Oakland Park, Florida
H&H study for the Lloyd Estates drainage basin seeking FEMA grants, conceptual design for a pump station across Sleepy River
discharging into the SFWMD C-13 canal. Performed drainage analysis and modeling.
2015 2018
Mills Pond Park
Fort Lauderdale, Florida
Responsible for Design and permitting for Mills Pond Park recreational development which includes three large synthetic turf soccer fields
along with site drainage system improvements, field lighting, irrigation, and related water and wastewater infrastructure improvements.
2015 2018
40
c.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete One Section E for Each Key Person.)
12. NAME
16. EDUCATION (Degree and Specialization)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
15. FIRM NAME AND LOCATION (City and State)
13. ROLE IN THIS CONTRACT
a. TOTAL b. WITH CURRENT FIRM
14. YEARS OF EXPERIENCE
19. RELEVANT PROJECTS
a.
b.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 NichOlAS KANeliDiS
NICHOLAS W. KANELIDIS, PE
calvin, Giordano & Associates, inc.
Master of engineering, 2011 Professional engineer - Florida
B.S. in civil engineering, 2009 FDeP Stormwater, erosion & Sedimentation control inspector
Fort Lauderdale, FL
University of Florida, Gainesville, FL No. 78536
Florida State University, Tallahassee, FL No. 40536
Mr. Kanelidis’ background experience encompasses site design, civil, geotechnical, surface water management, water, and wastewater
services for both the private and public sector. He also had significant involvement with his prior firm in representing Sunshine Water Control
District as District Engineer working on numerous Capital Improvements Projects. As a Project Manager at CGA, his responsibilities include
preparing contract proposals, developing and managing project schedules, hydrologic and hydraulic modeling, developing quantity take- offs
and cost estimates, preparing various engineering plans and technical specifications, permitting, bidding assistance, project management
during construction, addressing Contractor RFI’s, reviewing shop drawings, negotiating and reviewing change orders, as-built reviews, and
final project certifications. As an engineer with design and field experience, he is versatile in his ability to perform the tasks at each individual
project stage.
CIVIL ENGINEER 9 6
North Galt Shops Streetscape and Parking improvements
Fort Lauderdale, Florida
Project Manager for a City of Fort Lauderdale streetscapes and parking improvement project that includes new landscape, irrigation,
decorative light poles, curbing, pavement, striping, signage, sidewalk, drainage infrastructure, and geometric traffic improvements.
The existing hardscape and landscape needed replacement due to years of use and harsh environment, and traffic flow and pedestrian
crossings left room for improvement. In turn, the design includes new crosswalks and traffic flow patterns. The existing drainage
system had to be redesigned to accommodate these changes. Project scope includes design, permitting, reviewing and incorporating
Geotechnical and Subsurface Utility Exploration reports, quantity take-offs and cost estimating, value engineering, and preparing technical
specifications. CGA is currently under contract to provide support services during bidding and construction.
2019 - Ongoing 2020 - Ongoing
lift Station No. 48 Rehabilitation and Force Main Replacement
Cooper City, Florida
Project Manager for a municipal sewer pump station rehabilitation project including approximately 1,400 linear feet of force main
replacement. Located in a residential neighborhood, the existing station utilizes suction-lift pumps that are housed above the wet well
and are nearing the end of their useful service life. Additionally, the existing 4-inch cast iron force main was extremely corroded causing
a significant reduction in its inner diameter. The design included a conversion of the station to a submersible type with new pumps, a
new valve vault, and a new 4-inch HDPE force main designed primarily for horizontal direction drilling installation. Project scope includes
design, permitting, incorporating Geotechnical and SUE findings, preparing a cost estimate, technical specifications, bidding assistance,
coordinating and running construction progress meetings, conducting routine inspections, reviewing shop drawings, addressing
Contractor RFI’s, and final project certification.
2019 - Ongoing 2019 - Ongoing
Phase 2B Water Main improvements
Bal Harbour, Florida
Project Manager for a water main replacement project just east and parallel to Collins Avenue in Bal Harbour, Florida. The existing
8-inch water main was undersized and was located within easements on the properties of two high-rise condominiums. The new HDPE
12-inch water main was proposed within the same easement but was designed using primarily horizontal directional drilling methods
due to existing hardscape and access limitations. Reconnecting existing services, fire lines, and restoration had to be coordinated with
the Health Department, the Fire Department, and the Property Managers for the affected condominiums. The fast-tracked project was
completed in about two months. Project scope included design, permitting, incorporating Geotechnical and SUE findings, coordinating
and running a preconstruction meeting with all stakeholders, reviewing shop drawings, addressing Contractor RFI’s, conducting interim
inspections, overseeing testing, preparing record drawings, and final project certification.
2019 2019
41
h.
19. RELEVANT PROJECTS (CONT.)
f.
e.
d.
g.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 NichOlAS KANeliDiS
Natalie’s cove Drainage improvements
Cooper City, Florida
Project Engineer for the design and modification of a stormwater conveyance system for drainage improvements in the local
neighborhood. A drainage model and analysis were conducted for the entire basin. It was determined that significant stormwater level
of service improvements could be attained by increasing conveyance pipe sizes throughout the system and by increasing the existing
lake storage capacity via dredging along the bank. In addition to these stormwater improvements, the project consisted of roadway
resurfacing and ADA compliance modifications for pedestrian sidewalks. Project responsibilities included hydraulic modeling, design,
permitting, addressing permitting agency comments, preparing quantity take-offs, cost estimating, preparing technical specifications,
and addressing Bidder RFI’s. CGA also provided typical services during construction.
2013 - 2020 2018 - 2020
lift Station No. 18 Rehabilitation
Davie, Florida
PM for a LS rehabilitation project located within a residential neighborhood. Existing submersible pump configuration didn’t include a
guide rail system nor enough clearance to remove pumps from the wet well to perform inspections. Instead, Town Staff had to enter
confined space to perform work. Both existing pumps had failed, & Town Staff was operating the station using spare pumps. The existing
valve vault was settling, & mechanical appurtenances needed replacement. Design included new pumps w/ a guide rail system, new top
slab w/ access hatch, & new aboveground piping & valves on a concrete slab. Scope included coordination w/ pump manufacturers,
hydraulic calculations, electrical & instrumentation, cost estimating, preparation of contract documents, bidding assistance, reviewing
shop drawings, addressing Contractor RFI’s, reviewing & negotiating change orders as-needed, performing routine inspections,
approving Contractor payment applications, conducting construction progress meetings, reviewing as-builts, & final project certification.
2018 - 2020 2020
croissant Park Water Main Replacement
Fort Lauderdale, Florida
Project Manager for a residential project to replace 16,000 linear feet of undersized and deteriorating water main with DIP and HDPE
pipe. The existing piping did not provide proper fire protection to the neighborhood. Residents were also filing complaints regarding
water discoloration caused by corrosion of the existing cast iron mains. The project scope included design, permitting, reviewing and
incorporating Geotechnical report findings, coordinating subsurface utility exploration for conflict resolutions, preparing quantity take-
offs, cost estimating, preparing technical specifications, addressing Bidder RFI’s, and evaluating bid proposals. Most of the infrastructure
was installed using HDPE and trenchless methods to minimize disturbance to the neighborhood, including pipe bursting and horizontal
directional drilling. CGA also provided services during construction that included attending biweekly construction progress meetings,
reviewing shop drawings, addressing Contractor RFI’s, conducting interim inspections, reviewing as-builts, and final project certification.
2017 - 2020 2018 - 2020
Wastewater Treatment Plant Drying Bed Replacement
Boca Raton, Florida
Project Manager for a wastewater treatment plant project to replace and relocate the existing concrete drying bed at the City of Boca
Raton’s Utility Services Complex. The drying bed structure is used as part of the City’s vacuum truck operations for drying sewer solids
before properly disposing of the dry sludge. The existing drying bed had reached the end of its useful service life due to its constant
use and harsh environmental. A new, larger, and segmented drying bed was designed and constructed to improve daily operations and
efficiency. Project tasks included design, verifying turning radii and clearances for vacuum truck operations, reviewing Geotechnical
findings, resolving utility conflicts, cost estimating, preparing technical specifications, addressing Bidder RFI’s, evaluating bid proposals,
attending monthly construction progress meetings, reviewing shop drawings, addressing Contractor RFI’s, coordinating minor changes
during construction, conducting interim inspections, reviewing as-builts, and final project certification.
2017 - 2019 2018 - 2019
Pines Village Water Main Replacement - Phase i
Pembroke Pines, Florida
Project Manager for a residential neighborhood project to replace 20,000 linear feet of undersized and corroded galvanized water main with
new PVC and DIP. The buildup of rust in the existing mains resulted in numerous complaints about water discoloration and low pressures.
The design also included relocating water meters to the front of the properties and replacing private water services including dual check
valves and the installation of thermal expansion control devices at the house connections. Approximately half of the existing water mains
were located in the backyards of the single-family residential properties. Along with the relocations, water meters were also replaced
to allow for automatic readings. Project responsibilities included design, permitting, reviewing and incorporating Geotechnical findings,
preparing quantity takeoffs, cost estimating, preparing technical specifications, addressing Bidder RFI’s, evaluating bid submittals, and
attending neighborhood meetings with the City to address residents’ questions.
2018 2018 - 2019
42
m.
19. RELEVANT PROJECTS (CONT.)
k.
j.
i.
l.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 NichOlAS KANeliDiS
lift Station No. 9 Rehabilitation
Davie, Florida
Project Manager for a municipal sewer pump station rehabilitation. The existing pumps failed when the mechanical room flooded with
sewage backflow from the adjacent wet well. Since the station was being operated 24 hrs/day by a portable diesel-powered bypass pump
in a residential neighborhood, it quickly became a priority project for the Town. The project was unique in that the station is located within
Hollywood. Therefore, additional coordination was required between the two municipalities for permitting and construction scheduling.
The project scope included site visit documentation, pump manufacturer coordination and specifications, sewer flow analysis, hydraulic
calculations, ventilation system sizing, electrical and instrumentation, sump pump and piping replacement, cost estimating, permitting,
preparation of contract documents for bidding, addressing Bidder RFI’s, evaluating submitted bids, shop drawings reviews, addressing
Contractor RFI’s, reviewing and negotiating change orders, construction inspections, reviewing as-builts, and final project certification.
2017 - 2018 2018
Sewer Pump Station B-10 Rehabilitation
Fort Lauderdale, Florida
Project Manager for a municipal sewer pump station rehabilitation project. The existing pumps were reaching the end of their service
life, and the existing concrete wet well was consistently leaking into the dry mechanical room. Coordinating with the neighboring
residents, designating equipment staging areas, and determining proper MOT were crucial, since the station is located in the median of
the road. Tasks included analyzing existing flow and pressure conditions, hydraulic calculations, specifying new pumps, new electrical
and ventilation design, permitting, preparing technical specifications, bidding assistance, addressing Contractor RFI’s, reviewing shop
drawings, conducting routine inspections, reviewing and negotiating change orders, as-built reviews, and final project certification.
2015 - 2019 2017 - 2019
Sewer Pump Station D-41 Replacement
Fort Lauderdale, Florida
PM for a municipal sewer main & PS replacement. Upgrades to the station’s operating capacity were needed due to excessive flows,
frequent surcharging, & accommodation for future development sewer contributions. The scope entailed replacement & relocation of
existing station & redirection of gravity sewer conveyance network. Coordination played a key role in this project as the proposed location
for the PS & design of the new sewer main had to be planned with the neighboring development & their design team. Specific project
tasks included analysis of existing sewer flow contributions, review of existing force main pressures, hydraulic calculations for designing
new force main & submersible pumps, valve vault design, electrical & instrumentation design, permitting, coordinating with other
disciplines including Geotechnical & SUE, preparing technical specifications, bidding assistance, addressing Contractor RFI’s, reviewing
& negotiating change orders, shop drawing reviews, conducting routine inspections, reviewing as-builts, & final project certification.
2015 - 2018 2017 - 2018
Sanitary Sewer hydraulic Model and evaluation
Bal Harbour, Florida
Project Manager and primary developer of a hydraulic model and overall evaluation of Bal Harbour Village’s sanitary sewer network.
Bal Harbour Village owns, operates, and maintains a wastewater collection and transmission system that includes 27,000 linear feet
of gravity sewer, 5,000 linear feet of force main, and two pump stations. Wastewater from various customers, including single family
homes, oceanfront high rises, multi-family dwellings, and commercial properties, is collected and conveyed through laterals, gravity
sewer main, force main, and pump stations. The purpose of the hydraulic study was to provide the Village with the capability to predict
peak flows, hydraulic pressures, pump station capacities, and likelihood of surcharged conditions throughout their entire sanitary sewer
network and to assess the capacity to serve future proposed demands.
2019 2019
Bayshore Drive Drainage improvements
Fort Lauderdale, Florida
Project Manager for the analysis and design of drainage system improvements in the Central Beach Alliance Neighborhood located off
A1A. The scope included preparation of a drainage model for existing site conditions by using ICPR and utilizing survey, record drawings,
and LIDAR for calibration. A full drainage report summarized the different options for improvements in the area with associated costs.
Some of the proposed alternatives included exfiltration trenches, drainage injection wells, and tidal check valves. Ultimately, the City
tasked CGA to design tidal check valves on the outfall pipes and additional stormwater structures and conveyance piping in areas with
significant ponding. layout. Additionally, the City requested traffic improvements by the addition of a median at the unique intersection of
Bayshore Drive, Riomar Street, and Antioch Avenue. CGA also provided typical services during construction.
2014 - 2019 2016 - 2019
43
r.
19. RELEVANT PROJECTS (CONT.)
p.
o.
n.
q.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 NichOlAS KANeliDiS
lift Station No. 52 Rehabilitation
Cooper City, Florida
Project Manager for a municipal sewer pump station rehabilitation project. Improvements were needed due to the expiring service life
of the pumps and their insufficient operating capacity during peak flows and significant rain events. Tasks included design, permitting,
interpreting pressure data logger readings, hydraulic calculations, coordinating with pump manufacturers, existing sewer flow analysis,
monitoring geotechnical work, and coordinating with other professional disciplines.
2015 - 2016 2016
lift Station No. 21 Replacement
Cooper City, Florida
Project Manager for a municipal sewer pump station replacement project. The station is located within an HOA and required mechanical,
aesthetic, and immediate odor control improvements. Due to its proximity with adjacent residences and frequent odor complaints, the
station was relocated across the street. This required a sewer conveyance, landscape, and irrigation redesign. Tasks included design,
permitting, setting up pressure data loggers, hydraulic calculations, coordinating with pump manufacturers, existing sewer flow analysis,
preparing technical specifications, permitting, shop drawing reviews, addressing Contractor RFI’s, conducting routine inspections, and
final project certification.
2015 - 2018 2017 - 2018
Bid Pack 8 infrastructure improvements
Oakland Park, Florida
Project Engineer for the water and sewer improvements project. Design included approximately 18,000 linear feet of water main
replacement, 800 linear feet of drainage with exfiltration trench, 2,500 linear feet of sidewalk, rehabilitation of a sewer pump station, and
installation of four sewer combination air valves (SCAV) on the existing force main network. The system upgrades consisted of replacing
two-inch and four-inch diameter water main with either six-inch or eight-inch PVC or DIP. Additional fire hydrants were designed to
provide adequate fire protection for the residential neighborhoods. In addition to these water main improvements and SCAV’s, the sewer
pump station improvements were a critical component of this project. The station was experiencing failure due to extended run times
because of increases in collected wastewater flows and discharge force main pressures. Electrical upgrades and the design of variable
frequency drives were required to handle the various flow conditions.
2014 - 2018 2018 - 2019
lloyd estates industrial and Residential improvements
Oakland Park, Florida
Project Engineer for the design and modification of a stormwater conveyance system to improve flooding within the Lloyd Estates
Neighborhood. The project included a stormwater pump station and floodgates for major storm events along with new stormwater
structures and exfiltration trenches. New seawalls were designed and constructed downstream of the station that ultimately discharged
to the ocean via the South Florida Water Management District (SFWMD) C-13 Canal. The pump station site provided means for erosion
control that included rip-rap design. CGA also coordinated and assessed the environmental impacts with SFWMD and the Army Corps of
Engineers. In addition to stormwater discharge improvements, several areas included upgrades to the water distribution system for fire
protection services. The project funding was driven by a FEMA grant.
2013 - 2017 2016 - 2017
Bid Pack 9 infrastructure improvements
Oakland Park, Florida
Project Engineer during the construction phase of a large scale infrastructure improvements project that included replacement of three
municipal lift stations, approximately 20,000 linear feet of water main, 5,600 linear feet of force main, over 200 catch basins, and
numerous exfiltration trenches and conveyance piping throughout the 500 acre project area. Responsibilities included shop drawing
reviews, attending progress meetings, general engineering during construction, reviewing as-builts, validating and negotiating change
orders, and coordinating final project certifications.
2011 - 2017 2015 - 2017
44
c.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete One Section E for Each Key Person.)
12. NAME
16. EDUCATION (Degree and Specialization)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
15. FIRM NAME AND LOCATION (City and State)
13. ROLE IN THIS CONTRACT
a. TOTAL b. WITH CURRENT FIRM
14. YEARS OF EXPERIENCE
19. RELEVANT PROJECTS
a.
b.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 HeiDi HeNDeRSON
HEIDI BELLE HENDERSON, PE
Calvin, Giordano & Associates, inc.
M.S., environmental engineering, 2013 Professional engineer Florida
B.S., Civil engineering, 2003 Qualified Stormwater Management inspector
Fort Lauderdale, FL
Florida International University, Miami, Fl No. 72304
Florida State University, Tallahassee, FL No. 8491
Miss Henderson has over 15 years of civil engineering experience in land development for both commercial and residential projects.
Responsibilities include municipal reviews for Public Works and Utility permits, due diligence and site research, drainage design, water
distribution and sanitary sewer collection and transmission system design, construction cost estimates, general site development for
both public and private engineering projects, construction administration, observation, certification, and permitting services with various
municipalities and local agencies throughout Central Florida and South Florida inclusive of South Florida Water Management District (SFWMD),
Broward County, Miami-Dade County, Florida Department of Transportation (FDOT), Florida Department of Environmental Protection (FDEP),
and Florida Department of Health (FDOH).
ENGINEER 15 2+
Plan Review
Bal Harbour Village, Florida
Lead Public Works and Utilities Reviewer for the City’s Building Department for commercial and residential projects. Heidi assists
residents and Contractors by providing Public Works and Utilities information, and assists in educating the residents and Contractors in
the importance of utilizing and maintaining erosion control methods during construction.
06/2018 - Ongoing
Plan Review
Sunny Isles Beach, Florida
Lead Public Works Reviewer for the City’s Building Department for commercial and residential projects.
04/2018- 08/2018
Outfall O-13
Harbor Point, Florida
Miss Henderson is currently designing and permitting for the relocation of the existing drainage Outfall O-13 in the Village of Key
Biscayne. A pre-versus post-drainage analysis is required to demonstrate that the proposed improvements alleviate the current flooding
in the 14 Harbour Point Right-of-Way.
45
h.
19. RELEVANT PROJECTS (CONT.)
f.
e.
d.
g.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 HeiDi HeNDeRSON
Village Consultant
Bal Harbour, Florida
Calvin Giordano & Associates is the Village’s Consulting Engineer. Miss Henderson is a Consulting Engineer to Bal Harbour Village where
she manages the Sunshine 811 services for the Village’s dig tickets and design tickets; the Water, Sewer, Stormwater, Electrical GIS
database; and the as-built information for the Village. Heidi assists the Village in their day-to-day needs with respect to Public Works and
Utilities services, and oversees the request for as-builts for any proposed developments and improvements within the Village.
04/2018 - Ongoing
Yellow Green Farmer’s Market expansion
Hollywood, Florida
Miss Henderson is the Drainage and Utility Engineer of the expansion. This includes a drainage analysis of the existing conditions and the
proposed improvements. The design consists of exfiltration trench to provide storage for the improvements. The utility design includes a
new lift station for the additional flows that the market will be producing.
Plan Review - City of Dania Beach
Dania Beach, Florida
Provided plan review services to the City for Right-of-Way permits.
08/2019-01/2020
engineer - City of Dania Beach
Dania Beach, Florida
Assisted the City Engineer in the City’s day-to-day activities such as addressing customer concerns, responding to customer requests,
providing utility atlases, and managing City projects as needed.
09/2019-01/2020
engineer - City of Dania Beach
Dania Beach, Florida
Provide assistance to the Public Service Department by addressing customer concerns, responding to customer requests, and providing
utility atlases.
05/2020 - Ongoing
46
h.
19. RELEVANT PROJECTS (CONT.)
f.
e.
d.
g.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 HeiDi HeNDeRSON
Wawa at 6971 SW 34th Street
Miami, Florida
This site required similar efforts mentioned for the Wawa above where Miss Henderson was the Project Manager and Engineer of Record
for the design and permitting of the site, responsible for the water, sewer, and stormwater layout of 15-foot deep exfiltration trench;
required a Zoning hearing for a signage variance and platting via Miami-Dade County; and required the same permits as listed above.
01/2015-12/2017
Wawa at 11101 SW 184th Street
Miami, Florida
Miss Henderson was the Project Manager and Engineer of Record for the design and permitting of the site. She was responsible for the
site layout including ADA accessibility as well as water, sewer, and stormwater layout of the site. The stormwater management system
was composed of 15-foot deep exfiltration trench. The site required Zoning approval for a signage variance and platting through Miami-
Dade County. The permits required for this site were through Miami-Dade County Public Works Department, Miami-Dade County Water
and Sewer Department (WASD), and Miami-Dade County Building Department.
01/2015-12/2017
Wawa, inc.
Wawa is a well known gas station and convenience store that is known for their fresh bread and made-to-order sandwiches and is
making their way down to South Florida. Miss Henderson was the Project Manager for the Wawa program where she was involved from
the early conceptual phases of the projects through project completion. More specifically, her tasks involved due diligence for possible
new sites, preparation of various site layouts that conformed to both Wawa and the governing agencies criteria, conveying to the Wawa
the feasibility of the project, generating proposals based on the site’s requirements and necessary permitting efforts, coordinating
meetings with Wawa and the Developer(s) involved, preparing water, sewer, and stormwater civil design plans, calculations, and reports
for the projects, obtaining all required civil permits, assisting on building permitting efforts, and providing construction observation and
certification services. Provided construction administration services and certified the project.
2013 - 2017
City of Lauderhill, Florida
Lauderhill, Florida
Miss Henderson was the liaison between the Landscape Team and the City of Lauderhill in order to meet the City’s criteria and timeframe
for the beautification improvements for Ilene Lieberman Botanical Park and 17th Street Park. The projects consisted of using recyclable
materials for the improvements and providing a walking path, benches, and restoration of the existing landscape materials to provide a
more appealing environment for the community.
Sewer Pump Station No. 1 Drainage improvements
Bal Harbour Village, Florida
Miss Henderson was responsible for issuing the bid on behalf of the Village, which included preparation of technical specifications and
bid documents, submission of the bid to multiple vendors preparation of the probable construction cost estimate for a comparison to the
bid amounts received, responding to technical questions from prospective bidders, preparation and issuance of associated addendum,
and providing a recommendation of the lowest responsive and responsible bidder to the Village.
47
c.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete One Section E for Each Key Person.)
12. NAME
16. EDUCATION (Degree and Specialization)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
15. FIRM NAME AND LOCATION (City and State)
13. ROLE IN THIS CONTRACT
a. TOTAL b. WITH CURRENT FIRM
14. YEARS OF EXPERIENCE
19. RELEVANT PROJECTS
a.
b.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 JORge CeRvANTeS
JORGE R. CERVANTES, PE
Calvin, giordano & Associates, Inc.
electrical engineering Professional engineer Florida
Fort Lauderdale, FL
University of Oklahoma, Norman, OK No. 45832 (1992)
Mr. Cervantes has 32 years of experience in designing lighting and power systems for roadways, parks, manufacturing, commercial, residential
and educational buildings, engineering project fee estimates, lighting consultant expert witness. His experience includes lighting verification
and/or recertification of roadway, recreational parks, parking structures and outdoor parking areas. He is an expertise in AutoCAD.
ELECTRICAL ENGINEER 32 1+
Hallandale Beach SW Quadrant Drainage
Hallandale, Florida
Electrical design coordination, design and review of the pump station building and control station gate, generator sizing coordination and
controls. Coordination with local utility companies. Construction administration management.
2019
Lift Station #18
Davie, Florida
Electrical design coordination and design of the proposed sewage pump station. Coordination with local utility companies. Construction
administration management.
2019
90th Avenue Sanitary Sewer Improvements
Cooper City, Florida
Electrical design coordination and design of the proposed sewage pump station. Coordination with local utility companies. Construction
administration management.
2019
48
h.
19. RELEVANT PROJECTS (CONT.)
f.
e.
d.
g.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 JORge CeRvANTeS
Nova Drive
Davie, Florida
This road is classified as a collector road. This road contains sidewalks, cross interceptions, roundabout, pedestrian crossways and
paved roads. Design and coordination of the street lighting levels (average maintain horizontal illuminance, illuminance uniformity ratio
and veiling luminance ratio) as per FDOT Greenbook 2013 edition requirements. Selection of fixtures, pole heights and placements were
critical in order to achieve the requirements as per FDOT Greenbook. Careful consideration was given to existing and proposed vegetation
during design. Voltage drop calculations from point of source to each lighting pole on the circuit. Coordination with utility company for
new point of services.
2018 N/A
Davie Road extension Phase III
Davie, Florida
This road is classified as a collector road. This road contains sidewalks, pedestrian crossways and paved road. Design and coordination
of the street lighting levels (average maintain horizontal illuminance, illuminance uniformity ratio and veiling luminance ratio) as per FDOT
Greenbook 2018 edition requirements (Design using FDOT Greenbook 2018 edition was given due to adoption during 2019 calendar
year). Selection of fixtures, pole heights and placements were critical in order to achieve the requirements as per FDOT Greenbook.
Careful consideration was given to existing and proposed vegetation during design. Voltage drop calculations from point of source to
each lighting pole on the circuit. Coordination with utility company for new point of services.
2019
SW 2nd Avenue - Fort Lauderdale DDA
Fort Lauderdale, Florida
This road is classified as a local road. This road contains sidewalks and paved road. Design and coordination of the street lighting
levels (average maintain horizontal illuminance, illuminance uniformity ratio and veiling luminance ratio) as per FDOT Greenbook 2016
edition requirements. Utilizing DDA standard fixtures, poles and proper spacing, the FDOT Greenbook requirements were met. Careful
consideration was given to existing vegetation during design. Voltage drop calculations from point of source to each lighting pole on the
circuit.
2019
Water and Sanitary Lift Pump Station
Cooper City, Florida
Prepare sanitary lift pump station rehab criteria documents for Cooper City, rehab criteria documents include drawings and specifications
to meet client expectations. Coordination of the electrical equipment with manufacturers. Coordination of control systems for the pump
stations usage. Review contractor’s field installed equipment for compliance with construction documents. Review contractor’s pay
request on behave of the client. Prepare field observed construction status reports and provide feedback comments on any observed
deficiencies. Involve in the electrical engineering quality design for water and sanitary lift pump stations.
2019
Lift Pump Station B10
Fort Lauderdale, Florida
Construction administration management and project close out.
2019
49
m.
19. RELEVANT PROJECTS (CONT.)
k.
j.
i.
l.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 JORge CeRvANTeS
Catalina Drive
Weston, Florida
This road is classified as a local road. This road contains sidewalks and paved road. Design and coordination of the street lighting levels
(average maintain horizontal illuminance, illuminance uniformity ratio and veiling luminance ratio) as per FDOT Greenbook 2016 edition
requirements. Utilizing City of Weston standard fixtures, poles and proper spacing, the FDOT Greenbook requirements were met. Careful
consideration was given to existing vegetation during design. Voltage drop calculations from point of source to each lighting pole on the
circuit.
2018
Spring Boulevard
Weston, Florida
This road is classified as a local road. This road contains sidewalks and paved road. Design and coordination of the street lighting levels
(average maintain horizontal illuminance, illuminance uniformity ratio and veiling luminance ratio) as per FDOT Greenbook 2016 edition
requirements. Utilizing City of Weston standard fixtures, poles and proper spacing, the FDOT Greenbook requirements were met. Careful
consideration was given to existing vegetation during design. Voltage drop calculations from point of source to each lighting pole on the
circuit.
2018
North Lake Boulevard
Weston, Florida
This road is classified as a local road. This road contains sidewalks and paved road. Design and coordination of the street lighting levels
(average maintain horizontal illuminance, illuminance uniformity ratio and veiling luminance ratio) as per FDOT Greenbook 2016 edition
requirements. Utilizing City of Weston standard fixtures, poles and proper spacing, the FDOT Greenbook requirements were met. Careful
consideration was given to existing vegetation during design. Voltage drop calculations from point of source to each lighting pole on the
circuit.
2018
Pedestrian Bridge
Bal Harbour Island, Florida
Design and coordination of the bridge lighting levels (average maintain horizontal illuminance and illuminance uniformity ratio) as
per FDOT Greenbook 2016 edition requirements. Utilizing latest low voltage LED rail mounted fixtures and proper spacing, the FDOT
Greenbook requirements were met. Voltage drop calculations from point of source to each light fixture on the circuit.
2018
College Avenue
Davie, Florida
This road is classified as a collector road. This road contains sidewalks, cross interceptions, roundabout, pedestrian crossways and
paved roads. Design and coordination of the street lighting levels (average maintain horizontal illuminance, illuminance uniformity ratio
and veiling luminance ratio) as per FDOT Greenbook 2013 edition requirements. Utilizing FPL (Florida Power and Light) standard fixtures,
poles and proper spacing, the FDOT Greenbook requirements were met.
2018
50
c.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete One Section E for Each Key Person.)
12. NAME
16. EDUCATION (Degree and Specialization)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
15. FIRM NAME AND LOCATION (City and State)
13. ROLE IN THIS CONTRACT
a. TOTAL b. WITH CURRENT FIRM
14. YEARS OF EXPERIENCE
19. RELEVANT PROJECTS
a.
b.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 JuliO GONzAlez
JULIO E. GONZALEZ, PE
Calvin, Giordano & Associates, inc.
Bachelor Degree, Mechanical engineering Professional engineer Florida
Fort Lauderdale, FL
University of Puerto Rico No. 37275
Mr. Gonzalez has more than 20 years working in the construction industry, he has a strong background and experience with the Florida
Building, NFPA and Mechanical Codes. He has extensive knowledge and experience in design and management of mechanical systems
including HVAC, plumbing and fire protection for residential and commercial projects. Furthermore, he has experience with mechanical
centrifugal chillers, screw machines, reciprocating chillers, cooling towers, chilled water systems, DX systems as well as hydronic systems.
Due to Mr. Gonzalez’s extensive knowledge and experience, he has worked as a forensic engineer leading field investigations, evaluating
causes and losses by natural disasters, accidents, malfunction and vandalism related to mechanical systems. For the past several years, Mr.
Gonzalez has dedicated his professional career to performing technical inspections of mechanical systems as well as reviewing specifications
to ensure compliance with State and local codes.
ENGINEER 20+10
Mechanical engineer
Florida
Providing mechanical engineering services for the following: City of Homestead; Cassa Brickell - Miami, FL; Silverspot Cinema - Miami,
FL; Miami City Self Storage - Miami, FL; Atton Brickell Hotel - Miami, FL; Homewood Suites - Miami, FL; Seventh Avenue Transit Village
- Miami, FL; Leon Medical Centers - Miami, FL; Stardust East and West - Miami, FL; The Plaza at Lyric - Miami, FL; Miami International
Medical Center - Miami, FL; Met 3 Residential Tower - Miami, FL; 2020 Salzedo - Miami, FL; and Melia East and West - Miami, FL
11/2015 - Ongoing
Mechanical engineer - NV5, inc.
Hollywood, Florida
Plans review for mechanical and plumbing.
Perform inspections for mechanical and plumbing during the different phases of construction.
Perform Forensic Engineering work for mechanical and plumbing systems.
09/2015-11/2015
Delta G Consulting engineers
Fort Lauderdale, Florida
Project Manager for a Health Care Team, and Mechanical Engineer of Record.
In charge of the HVAC, Plumbing and Fire Protection of various projects, mostly Health Care projects. Office project mananagement and
meeting with clients during the different phases of design. Meet with AHCA for stand-up meetings, final AHCA inspections.
Assisted of less experienced engineers and designers.
Wrote technical specifications for division 15.
Implemented new techniques for Quality Control.
08/2013-08/2015
51
h.
19. RELEVANT PROJECTS (CONT.)
f.
e.
d.
g.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 JuliO GONzAlez
VeRTeX Construction Services, inc. - Forensic engineer
Fort Lauderdale, Florida
Forensic Engineer leading field investigations evaluate causes and losses by natural disasters, accidents, malfunction and vandalism
related to mechanical systems of buildings and structures.
02/2010-10/2011
American Test lab of South Florida - Witnessing engineer
Fort Lauderdale, Florida
Witnessing Engineer for an independent Material Testing Laboratory in Miami, Florida. Witness laboratory testing, review and sign and
seal official report documents for High-Velocity Hurricane Zones, in accordance with Miami-Dade County, Florida Building Code, ASTM,
AAMA, ANSI, and other related Building Construction Standards.
05/2009-Ongoing
Smith Seckman Reid, inc. - Mechanical engineer
Deerfield Beach, Florida
Project Manager for a Health Care Team, and Mechanical Engineer of Record.
In charge of the HVAC, Plumbing and Fire Protection of various projects, mostly Health Care projects. Office project mananagement and
meeting with clients during the different phases of design. Meet with AHCA for stand-up meetings, final AHCA inspections.
Assisted of less experienced engineers and designers.
Wrote technical specifications for division 15.
Implemented new techniques for Quality Control.
10/2011-08/2013
52
c.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete One Section E for Each Key Person.)
12. NAME
16. EDUCATION (Degree and Specialization)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
15. FIRM NAME AND LOCATION (City and State)
13. ROLE IN THIS CONTRACT
a. TOTAL b. WITH CURRENT FIRM
14. YEARS OF EXPERIENCE
19. RELEVANT PROJECTS
a.
b.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 KAThARiNe KupSKy
KATHARINE KUPSKY
Calvin, Giordano & Associates, inc.
university of Wisconsin Advanced Blueprint Reading and estimating
Advanced CAD
Fort Lauderdale, FL
Adult Education Community College
Broward Community College
Ms. Kupsky’s background experience entails drafted and designed residential, commercial, retail, industrial and governmental properties from
site planning through building permit, prepared environmental plans and sections, and prepared cost estimates.
At CGA, Ms. Kupsky’s responsibilities include drafting plans and details for civil and electrical engineers, coordinate with Sunshine 811 for
utility locates, and prepare cost estimates.
CAD TECHNICIAN 27 6
City Center parking Lot
Pembroke Pines, Florida
Drafting civil and electrical plans and details for development of a parking lot to serve the future City Center and relocate the roadway
for ease of access and to reduce impacts from existing FPL transmission lines. The project entailed modifying drive aisles, pavement
markings and signage, parking lot layout redesign, drainage modeling with hydraulic calculations, and modifying the existing permit.
Spring Boulevard
Weston, Florida
Drafted electrical plans and details for this project for the design of new street lighting.
Bid pack 8 infrastructure improvements
Oakland Park, Florida
Drafted civil and electrical plans and details for a design including approximately 18,000 linear feet of water main replacement, 800 linear
feet of drainage with exfiltration trench, 2,500 linear feet of sidewalk, rehabilitation of a sewer pump station, and installation of four sewer
combination air valves (SCAV) on the existing force main network.
53
h.
19. RELEVANT PROJECTS (CONT.)
f.
e.
d.
g.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 KAThARiNe KupSKy
Andrews Avenue
Oakland Park, Florida
Drafted civil and electrical plans for the removal of existing two-way turn lanes in the middle of the roadway and replace with landscape
medians and dedicated turn lanes, reconstruction of existing sidewalks to meet current ADA standards, add bike lanes, mid-block
crossings for pedestrians, pavement markings & signage for a four lane divided road, and lighting.
Mills pond
Fort Lauderdale, Florida
Drafted civil and electrical plans, details, and notes for adding synthetic turf fields to Mills Pond Park. The Electrical design showed power
distribution, fixture and equipment schedule, lighting layout, photometrics, special systems diagrams, and sport lighting design. The civil
design included grading and drainage, utility service points and supply lines, pavement, and pedestrian walkways.
hallandale Beach SW Quadrant Drainage improvements
Hallandale Beach, Florida
Drafted Civil and Electrical plans, details and notes for the design of enhancements of the drainage system in the city of Hallandale Beach.
The project included construction of a new pumping station, storm water force mains, injection wells, a control structure with flap and
sluice gates, and a 800 KW generator.
Artists Alley
Delray Beach, Florida
Drafted electrical plans, details and photometrics for street beautification. The street enhancements included concrete sidewalks,
landscape beautification, drainage, water main and on-street parking.
patch Reef park
Boca Raton, Florida
Drafted civil plans, details, and notes for adding synthetic turf fields to Patch Reef Park. The Electrical design showed relocation of main
power feed and power to irrigation pump. The civil design included grading and drainage, relocation of water and sewer lines, pavement,
pedestrian walkways and design of the Synthetic turf fields including field striping.
54
c.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete One Section E for Each Key Person.)
12. NAME
16. EDUCATION (Degree and Specialization)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
15. FIRM NAME AND LOCATION (City and State)
13. ROLE IN THIS CONTRACT
a. TOTAL b. WITH CURRENT FIRM
14. YEARS OF EXPERIENCE
19. RELEVANT PROJECTS
a.
b.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 STeve WATTS
STEVEN M. WATTS, PSM
Calvin, Giordano & Associates, Inc.
BSLS, 1984, Lambda Sigman: Land Surveying Honorary Florida PSM
Fort Lauderdale, FL
Purdue University, West Lafayette, IN No. 4588
Mr. Watts has over 36 years of experience, 32 years as a licensed Florida Professional Surveyor & Mapper. Having spent his entire surveying
career working in South Florida, he is extremely knowledgeable of the rules, requirements and specifications for completing surveying and
mapping projects in the tri-county area. He specializes in architectural and engineering design type surveys, land acquisition, easements, title
research, and computer mapping.
SURVEY AND MAPPING 36 6
North Beach Oceanside Park
Miami Beach, Florida
Project Manager for the Boundary and Topographic Survey tasks associated with the re-design of the North Beach Oceanside Park.
Survey tasks included defining the location of the Coastal Construction Control Line (CCCL), the Erosion Control Line (ECL), the Seasonal
High-Water Line and the limits of the dune boundaries.
2015 - Ongoing
Middle Beach Recreational Corridor
Miami Beach, Florida
Project Manager for the surveying tasks associated with the City of Miami Beach Middle Beach Recreational Corridor project. Tasks
included topographic survey and property base mapping throughout the project limits. Additional responsibilities included responding
to Request for Information (RFI’s) as they pertain to survey matters and assisting design professionals with survey related issues.
2012 - 2018
Dune Survey & Beach Front Property Map
Surfside, Florida
Project Manager for the base mapping of the twenty-seven (27) individual properties between Collins Avenue and the Atlantic Ocean
depicting the Coastal Construction Control Line (CCCL), Bulkhead Line and Erosion Control Line (ECL) in relation to the property lines,
with the town limits of Surfside. Overlaid hydrographic elevation information as provided by U.S. Army Corps of Engineers.
2018 - 2019
55
h.
19. RELEVANT PROJECTS (CONT.)
f.
e.
d.
g.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 STeve WATTS
General Surveying & Mapping Services
Pembroke Pines, Florida
Boundary and Topographic Surveys, As-Built Surveys, Legal Descriptions, City Limit Determinations and General Surveying Services for
the City of Pembroke Pines. Additional responsibilities include project surveyor for the topographic survey of a portion of the Pines Health
Park, the Johnson Street Water Treatment Plant and the FPL Easement Parking Lot at City Centre.
Ongoing
General Surveying & Mapping Services
Surfside, Florida
Site Plan and Development Review Committee regarding survey matters; Engineering Design Surveys for parks and underground utility
projects, Town parking lot parcels and municipal properties, sketch and legal descriptions for beach hardpack easements and FEMA
Elevation Certificates.
2010 - Ongoing
General Surveying & Mapping Services
Fort Lauderdale, Florida
Route Survey of NE 13th Street from NE 4th Ave to NE 9th Ave.; Boundary and Topographic Surveys for Warsaw & Provident Park,
Topographic Survey and Sketch and Legal Description of Utility Easement - Mills Pond Park.
Ongoing
General Surveying & Mapping Services
North Lauderdale, Florida
Boundary and Topographic Surveys, As-Built Surveys, Legal Descriptions, City Limit Determinations and General Surveying Services for
the City of North Lauderdale. Additional responsibilities include project surveyor for the topographic survey of the municipal complex,
GIS, water control district and utility mapping, Hampton Pines Park and Silver Lakes Middle School ball field renovation.
Ongoing
Topographic Survey - Westchester Cultural Arts Center/Topographic Park
Miami-Dade County, Florida
Project Manager for Topographic Survey for a portion of Tropical Park located at 7900 SW 40th Street, Miami for the proposed Westchester
Cultural Arts Center.
Ongoing
56
m.
19. RELEVANT PROJECTS (CONT.)
k.
j.
i.
l.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 STeve WATTS
Margate - vinson Park
Margate, Florida
Surveyor for the Boundary & Topographic Survey for Margate Vinson Park, 5790 Margate Boulevard, Margate, being all of Parcel A of the
plat of MARGATE COMPLEX, Plat Book 172, Page 46, B.C.R., Parcel ID of 4841-36-24-0010. Location of all above-ground improvements
within the parcel and including the one-half right-of-way of the adjacent roadways with horizontal locations and vertical elevations being
obtained for such items as sidewalks, edge of pavement, concrete curb, ball fields, buildings, parking lot striping, fences, driveways and
visible above-ground utilities.
04/2020
General Surveying & Mapping Services
Weston, Florida
FEMA Flood Elevation Certificates for Community Buildings, Site Plan and Development Review Committee regarding survey matters;
Engineering Design Surveys for Village Homes of Country Isles Water Main & Service replacement Project; Sketch and Legal Descriptions
for parcel acquisition and City Limits Exhibits between Weston and Town of Davie.
Ongoing
57
c.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete One Section E for Each Key Person.)
12. NAME
16. EDUCATION (Degree and Specialization)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
15. FIRM NAME AND LOCATION (City and State)
13. ROLE IN THIS CONTRACT
a. TOTAL b. WITH CURRENT FIRM
14. YEARS OF EXPERIENCE
19. RELEVANT PROJECTS
a.
b.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 PAblO DOMiNguez
PABLO DOMINGUEZ
Calvin, giordano & Associates, inc.
Miami Dade College N/A
Fort Lauderdale, FL
Miami-Dade, FL
Mr. Dominguez has 18 years of experience as a surveyor and mapper. Having spent his entire surveying career working in South Florida, he
is extremely knowledgeable of the rules, requirements and specifications for completing surveying and mapping projects in the South Florida
area. He specializes in Digital Terrain Mapping (DTM) type surveys, design surveys, right of way surveys, hydrographic surveys, 3D laser
scanning surveys as well as construction stake out projects, land acquisition and computer mapping.
SURVEY AND MAPPING 18 6
Dune Survey & beach Front Property Map
Surfside, Florida
Survey Technician for the base mapping of the twenty-seven (27) individual properties between Collins Avenue and the Atlantic Ocean
depicting the Coastal Construction Control Line (CCCL), Bulkhead Line and Erosion Control Line (ECL) in relation to the property lines,
with the town limits of Surfside. Overlaid hydrographic elevation information as provided by U.S. Army Corps of Engineers.
2012
general Surveying & Mapping Services
Miami Beach, Florida
3D laser scanning of Fontainebleau Hotel interior and exterior walls for the purpose of generating civil plans to refurbish the historic look.
2009
Middle beach Recreational Corridor
Miami Beach, Florida
Senior Party Chief, responsible for the field surveying tasks associated with the City of Miami Beach Middle Beach Recreational Corridor
project. Tasks included establishing survey control networks, three wire bench runs, topographic data collection, recovery of property
monuments and supervising field data collection efforts with multiple crews.
2012 - 2018
58
h.
19. RELEVANT PROJECTS (CONT.)
f.
e.
d.
g.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 PAblO DOMiNguez
giS System
Key West, Florida
Location of all power poles and transformer pads belonging to Keys Energy between mile marker 1 (Key West) thru mile marker 40 (Big
Pine Key) along US-1 and community roads for purpose of GIS map also including Tank Island. Utilizing GPS Handheld and GPS RTK
instruments.
2013
general Surveying & Mapping Services
Miami Beach, Florida
Directed field crew operations for the 3D laser scanning of treatment plant facilities at the George T. Lohmeyer Wastewater Treatment
Plant. Additional tasks included processing 3D point cloud and compiling information in an AutoCAD drawing format.
2020
3D High Definition laser Scanning - george T. lohmeyer Regional WTP
Fort Lauderdale, Florida
Drainage survey for the city of Marathon, Fl. To include the recovery/ reset of primary network control, location of all drainage structures,
measure inverts, check cross sections along US-1 for FDOT.
2020
Topographic Survey - Westchester Cultural Arts Center/Tropical Park
Miami-Dade County, Florida
Drainage survey for the city of Marathon, Fl. To include the recovery/ reset of primary network control, location of all drainage structures,
measure inverts, check cross sections along US-1 for FDOT.
Ongoing
general Surveying & Mapping Services
Marathon, Florida
Drainage survey for the city of Marathon, Fl. To include the recovery/ reset of primary network control, location of all drainage structures,
measure inverts, check cross sections along US-1 for FDOT.
2008
59
l.
19. RELEVANT PROJECTS (CONT.)
j.
i.
h.
k.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 PAblO DOMiNguez
general Surveying & Mapping Services
Pompano Beach, Florida
Location and elevations of all drainage structures within the city of Pompano Beach including inverts, pipes and boxes material and sizes
for drainage study to improve drainage system. For the city of Pompano Beach, FL.
2012
general Surveying & Mapping Services
Islamorda, Florida
Drainage survey for the city of Marathon, Fl. To include the recovery/ reset of primary network control, location of all drainage structures,
measure inverts, check cross sections along US-1 for FDOT.
Ongoing
Margate - Vinson Park
Margate, Florida
Survey Technician for the Boundary & Topographic Survey for Margate Vinson Park, 5790 Margate Boulevard, Margate, being all of
Parcel A of the plat of MARGATE COMPLEX, Plat Book 172, Page 46, B.C.R., Parcel ID of 4841-36-24-0010. Location of all above-
ground improvements within the parcel and including the one-half right-of-way of the adjacent roadways with horizontal locations
and vertical elevations being obtained for such items as sidewalks, edge of pavement, concrete curb, ball fields, buildings, parking lot
striping, fences, driveways and visible above-ground utilities.
04/2020
60
c.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete One Section E for Each Key Person.)
12. NAME
16. EDUCATION (Degree and Specialization)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
15. FIRM NAME AND LOCATION (City and State)
13. ROLE IN THIS CONTRACT
a. TOTAL b. WITH CURRENT FIRM
14. YEARS OF EXPERIENCE
19. RELEVANT PROJECTS
a.
b.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 SANDRA Lee
SANDRA LEE, AICP CEP, CFM, LEED AP BD
Calvin, Giordano & Associates, Inc.
M.A. Biology/ecology, Magna Cum Laude AICP CeP
B.A. Biology/Botany, Manga Cum Laude LeeD AP BD+C / CFM US-07579
Fort Lauderdale, FL
St. Cloud State University, St. Cloud, MN No. 018627
St. Cloud State University, St. Cloud, MN No. 10215598
Ms. Lee has over 30 years of professional experience & heads up CGA’s Env. Dept. coordinating regulatory permitting, env. planning, site
assessment, resource management & env. technical support services. In general, Ms. Lee provides permitting services for env. resources
permits at the local, state & federal level, coordinates interagency & multi-disciplinary team efforts, provides the most feasible dev. & mitigation
options, probable costs for mitigation options, provides tree mitigation plans & tree removal permitting services, conducts wetland delineations
& wetland functional assessments, prepares Coastal & Conservation Elements for Comprehensive plans, coordinates on Comprehensive Plan
Evaluation & Appraisal Reports (EAR) & EAR based amendments, designs wetland mitigation areas, provides bidding & const. oversight
services for the const. & installation of mitigation areas, provides technical support, provides env. resource management & environmental
planning services to municipalities, provides floodplain management assistance & annual CRS reporting, provides annual NPDES reporting,
manages field staff conducting wildlife & habitat assessments, imperiled species surveys & compliance monitoring reporting.
ENVIRONMENTAL SPECIALIST 30+20
City Center Parking
Pembroke Pines, Florida
Responsible for environmental permitting, including the site assessments, wetland assessments and obtaining a US COE, a County and
a South Florida Water Management District permit for the development site and for a newly constructed off-site mitigation area. Nearly
the entirety of the development site was wetland and was comprised of multiple habitat types and qualities; also developed the mitigation
plan for the conversion of an offsite golf course to wetland habitats. The development fell within an FPL power line easement requiring
additional coordination and approvals with FPL. The US COE permit required purchasing mitigation bank credits. Economic developments
in 2014 lead to the City selling the off-site golf course. Worked with the City to release the recorded conservation easement and obtain
new permits to allow the City to build the parking facility within the FPL easement with a combination of mitigation bank credits and off-
site mitigation at another location.
2008 2012
Lloyd estates Residential Improvements
Oakland Park, Florida
CGA was retained by the City of Oakland Park to address flooding issues in an older residential neighborhood. The project involves the
installation of swales/exfiltration trenches, piping and other improvements within the upland public right of ways. The project also involves
the installation of two (2) new outfalls into the Sleepy River; dredging, a new sluice gate and new seawalls in the river; the construction of
a pump station and the creation of a bio-swale/river overflow area within property adjacent to the river. CGA environmental staff conducted
all site assessments for permitting, designed the bio-swale stormwater overflow area, and processed permits through the U.S. COE, the
SFWMD and Broward County. Permitting challenges with this project included close coordination with the SFWMD operations staff on
project interactions with the C13 canal, also amending a sovereign submerged lands lease for newdredge areas. CGA’s fees: $520,000.
2013 Ongoing
Drainage Improvements
Weston, Florida
Conducted the site inspections and obtained permits from the US COE, the County and SFWMD for drainage enhancements.
2012 2016
61
h.
19. RELEVANT PROJECTS (CONT.)
f.
e.
d.
g.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 SANDRA Lee
Drainage Improvements
Surfside, Florida
Tracked all expenditures and processed and obtained all grant disbursement funds for the City for two Florida Department of Environmental
Protection grants.
2012 - 2018
Sanitary Sewer Improvements
Surfside, Florida
Tracked all expenditures and processed and obtained all grant disbursement funds for the City from a Florida Department of Environmental
Protection grant.
2012 - 2018
Bonaventure Pump Station and Drainage Improvements
Weston, Florida
Tracked all expenditures and processed and obtained all grant disbursement funds for the City from a Florida Division of Emergency
Management Hazard Mitigation grant, a South Florida Water Management District grant, and a Florida Department of Environmental
Protection grant. Compiled the grant final report and closed out the Florida DEM grant.
2007 - 2017
Public Lands Irrigation
Weston, Florida
Obtained a water use permit from the South Florida Water Management District for nearly 1,000 acres of irrigated public land. Also
obtained a modification to this permit.
2014
Drainage Improvements
Hallandale Beach, Florida
Responsible for all site assessments and obtaining permits through the US COE and Broward County; Broward County reviewed and
issued the SFWMD permit through the delegation agreement. The project involved the installation of a sluice gate, and new seawalls and
involved the construction of a pump station within man-made City owned canal.
2016 2018
62
m.
19. RELEVANT PROJECTS (CONT.)
k.
j.
i.
l.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 SANDRA Lee
Dania Beach Basin 5
Dania Beach, Florida
CGA designed a unique stormwater improvement system for the City to benefit both the developed and adjacent natural habitats. CGA
has conducted all the site and wetland functional assessments for permitting and has processed permits through the ACOE, the South
Florida Water Management District and Broward County. Permitting required extensive negotiation with various Divisions of Broward
County including the development of an Agreement with the County and City for use of the County land, and approval by the County
Commission. The construction of the Bio-swale did require unavoidable impacts to wetlands; however, the design plan within the swale
included removal of all exotic vegetation, excavation of marginal wetland habitat with revegetation, and increased hydrology to low
quality wetlands thereby creating enhancements with a greater functional gain than the functional loss through the impacts. CGA’s fees:
$236,000.
2007 2015
Dania Cove Park
Dania Beach, Florida
CGA was retained by the City to develop a waterfront park design on an archeologically significant site containing a scenic mangrove
cove, located along the Dania Cut-off canal. The park design included a fishing dock & platform, picnic pavilions & an exercise path. Native
plantings were used to eliminate the park’s need for permanent irrigation, and plants were selected for their educational opportunities
including highlighting the butterfly attracting varieties. The scope included designing a stabilization system for a badly eroded and
unstable shoreline embankment along with vegetating the shoreline; designing informational kiosks featuring the historic Native American
midden and the site’s natural resources; and obtaining all required permits for the installation of the site features. The scope also included
coordinating with the County and State on gaining approval for the site design, tracking all expenditures and processing and obtaining all
grant funds for the City, from the State and County and closing out the grants and permits. CGA’s fees: $103,000.
2011 2012
George english Park
Fort Lauderdale, Florida
CGA provided a design plan to demolish and replace aging boat ramps to accommodate larger vessels and provide floating docks on
each side of the ramps that are longer than the previous fixed docks. An additional floating dock was also added to an existing docking
facility on the northern side of the basin to accommodate other park recreational activities. CGA conducted all site inspections designed
a shoreline mangrove planter, processed and obtained all required environmental permits.
2016 2019
A-1-A Improvements and Bike Lanes
Jupiter, Florida
Obtained environmental permits, conducted the site assessments, including shoreline and submerged aquatic vegetation surveys, for
new outfalls into the Lake Worth Creek Aquatic Preserve, which is recognized as Outstanding Florida Waters. Conducted the investigations
to complete and submit the environmental LAP documentation.
2007 - 2014
Resiliency Planning
Surfside, Florida
Created a Climate Crisis document outlining the current and projected conditions and projections by time frame; a local and regional
overview; a review of shocks, stresses and vulnerabilities; a resource list; and strategic next steps to aid the Town in defining where
they want to be how they will get there. Also developed a Climate Action Plan containing feasible, tangible planning policies and actions
relating to operations, codes, coordination and public outreach.
2019
63
c.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete One Section E for Each Key Person.)
12. NAME
16. EDUCATION (Degree and Specialization)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
15. FIRM NAME AND LOCATION (City and State)
13. ROLE IN THIS CONTRACT
a. TOTAL b. WITH CURRENT FIRM
14. YEARS OF EXPERIENCE
19. RELEVANT PROJECTS
a.
b.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 DRew LiNDeMANN
DREW LINDEMANN
Calvin, Giordano & Associates, inc.
Master in Soil and water Science
Bachelor in Science in Landscape and Nursery Manager
Fort Lauderdale, FL
University of Florida, Gainesville, FL
University of Florida, Gainesville, FL
Mr. Lindemann is responsible for providing Arborist and Landscape plan review services for several municipalities. He is also responsible for
performing habitat assessments, wetland delineations, endangered species surveys, mitigation construction oversight, contract administration,
and contract management and compliance monitoring for projects impacting environmentally sensitive lands. Mr. Lindemann has provided
landscape inspections and arborist review services for the Town of Davie and the Cities of Deerfield Beach and Tampa over the past few years.
He has an excellent ability to work with municipal residents and commercial property owners to resolve landscape issues. He is very detailed
oriented and is familiar with the technology required to accomplish the tasks required for municipal reviews. He has provided oversight of the
exotic and invasive plant control contract on over 2,200 acres of sensitive wetland mitigation lands in the City of Weston that are known habitat
to listed species such as the Everglade Snail Kite, Wood Stork, and American Alligator populations.
ENVIRONMENTAL SPECIALIST 16 6+
City Center of Pembroke Pines
Pembroke Pines, Florida
Environmental Specialist. Conducted construction inspection for landscape installation for new parking facility, reviewed the mitigation
for a created wetland and worked with City staff for approvals.
2018
Palm Aire
Pompano Beach, Florida
Environmental Specialist. Conducted ISA tree valuations, and provided mitigation requirements to meet the City’s code.
2017
Boulevard of Champions
North Lauderdale, Florida
Environmental Specialist. Conducted tree inventory, inspections, tree valuations, and landscape inspections.
2017
iSA Certified Arborist
FL-5581A
64
h.
19. RELEVANT PROJECTS (CONT.)
f.
e.
d.
g.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 DRew LiNDeMANN
Landscape Plan Review and Arborist Services
Tampa, Florida
Calvin, Giordano & Associates, Inc. (CGA) was contracted by the City of Tampa to provide Arborist services and Landscape Plan Review.
CGA provided an environmental specialist to review wetland projects as well as a Landscape Plan Reviewer to assist the City with
required landscaping for new and renovated land development projects. CGA provided review and approval of planting plans for site
plan development, inspected construction sites to ensure compliance with approved tree protection plans, prepared reports, processed
associated paperwork and data entry, and worked with individual developers, builders, homeowners, and other customers to assist in
ensuring compliance with the City’s landscape code and tree protection ordinance.
2019
Phillips Plat
Collects the field data, complies and submits the monitoring reports for 8.6 acres of tidally influences mangrove habitat recognized as
a Local Area of Particular Concern by Broward County. The site required the installation of flushing canals within the mangrove habitat,
hand clearing of invasive species, and the construction of a bermed freshwater storm water management area within the mangrove
habitat.s
Miramar Pinelands
Miramar, FL
Collects the field data, complies and submits the monitoring reports for 31.9 acres of wetland restoration located on Broward County
Park land at the historic head of the Snake Creek slough, containing open water and wet prairie habitat.
North Shore Oceanview Park
Miami Beach, Florida
Environmental Specialist. Conducted tree inventory and vegetation survey, which was reviewed by Miami-Dade County.
2018
65
c.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete One Section E for Each Key Person.)
12. NAME
16. EDUCATION (Degree and Specialization)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
15. FIRM NAME AND LOCATION (City and State)
13. ROLE IN THIS CONTRACT
a. TOTAL b. WITH CURRENT FIRM
14. YEARS OF EXPERIENCE
19. RELEVANT PROJECTS
a.
b.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 TAMMy COOk-WeeDON
TAMMY COOK-WEEDON, PLA, LEED AP+C
Calvin, Giordano & Associates, Inc.
B.S. Landscape Architecture, 1987 Registered Professional Landscape Architect Florida
LeeD AP BD+C
Fort Lauderdale, FL
Texas A&M University College Station No. 0001328
No. 10066306-AP-BD+C
Ms. Cook-Weedon leads the Landscape Architectural staff, has over 33 years of landscape architectural experience with demonstrated
strengths in creative design, graphic presentations, and planting design. She has successfully completed numerous large-scale projects,
which encompassed design studies, planting designs, natural area development and the various inter-related professions and tasks necessary
to manage the projects through to completion. Ms. Cook-Weedon manages a staff of eleven at CGA where she provides scheduling, addresses
CAD staffing and directs design issues as well as monitors budgets and serves on the Executive Management team.
LANDSCAPE ARCHITECT 33 23
Mills Pond Park: Soccer/Lacrosse Fields
Fort Lauderdale, Florida
Developed a plan to build 3 new synthetic turf soccer and lacrosse fields at Mills Pond Park, including coordinating surveying, civil
engineering, electrical engineering, site planning, landscape architecture, and all of the sub-consultants on the project. The design of the
new fields will include drainage, lighting, and irrigation as well as associated parking, walkways, and landscape improvements. CGA’s
fees: $379,000. Construction cost is estimated at $3.3 million
2016 2019
Soccer Field Conversion at Weston Regional Park
Weston, Florida
Ms. Cook-Weedon managed staff of the landscape architecture department to convert four of the City’s existing grass soccer fields to
synthetic turf fields. These conversions will be the first of two park field conversions in the city. The selected synthetic turf option uses an
organic infill material rather than the standard black rubber material. Early test results indicated players raving about the playing surface.
Services included Civil Engineering as well. Cost: $350,000.00 Construction cost estimated at $3.5 million.
2014 - 2016 2018
Middle Beach Recreational Corridor
Miami Beach, Florida
Landscape Architect of Record – CGA oversaw coordination of all engineering & environmental efforts associated this 2-mile long linear
multi-use trail project on State-owned lands, as well as was responsible for all planting & hardscape design & public outreach. CGA
designed & permitted an on-grade, ADA-accessible pathway that supports the use of pedestrians & cyclists. The project is a part of
the greater Atlantic Greenway Network & comprises a critical component of the bicycle facilities throughout the City. It connects Indian
Beach Park on the south to the North Beach Recreational Trail at Allison Park with a 2-mile paver walkway, continuing the City’s unique
branding qualities. Conducted one-on-one meetings with over 39 condominium properties to gather support for the project, respond to
resident’s concerns, & address design restrictions set forth in the FAC & balance those against resident’s expectations. CGA successfully
shepherded the project through all State & local agency permitting processes. Cost: $534,000.00. Const. Cost Estimated at $13.2 M
2013 2014
66
h.
19. RELEVANT PROJECTS (CONT.)
f.
e.
d.
g.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 TAMMy COOk-WeeDON
Joe DiMaggio Children’s Hospital Visitor’s Clubhouse
Hollywood, Florida
Prepared the site and landscape design for a restorative garden with a playground area specifically for the use by children users of the
Joe DiMaggio facility. Cost: $250,000 Construction cost is estimated at $2.5 million.
1995 2000
Hickory Point Recreational Facilities
Tavares, Florida
Landscape Architect. The project consisted of the site design of a waterfront park that included marinas, boat ramps, wetland educational
boardwalks, environmental signage, fishing stations and a communal pavilion. Cost: $220, 000.00. Construction cost estimated at $2.5
million
1992 1996
Deering estate at Old Cutler
Palmetto Bay, Florida
Historical restoration and landscape design to repair the damaged areas of the estate following Hurricane Andrews devastation of
the property, including detailed archeological planting design, habitat restoration and planting design for a new visitors’ facility. Cost:
$28,000.00. Construction cost estimated at $2.8 million.
2003 2008
Miami Beach - North Beach Oceanside Park
Miami Beach, Florida
Landscape Architect of Record, oversaw the programming and design of the project site, conducting the necessary public outreach to
gather Commission approval and coordinating important aesthetic and sustainable improvements with engineering needs of the project.
CGA was responsible for the conceptual design of all material selections and palette, retaining walls, fences, lighting, branding elements,
and planting. Ms. Cook-Weedon provided assistant by overseeing the permitting process, addressed value engineering issues and
provided shop drawing reviews. Cost: $840,000.00 Construction cost estimated at $11.5 million.
2016 - 2020 2020
Delray Beach Fire Rescue Headquarters Plaza
Delray Beach, Florida
Senior Landscape Architect. Designing and permitting improvements to pedestrian at the SE corner of the Fire Rescues Headquarters
Building for the City of Delray Beach and the CRA. Project includes on the creation of a pedestrian plaza which will feature public art. A
detention area will be resized to accommodate the plaza requiring the creation of retaining and seat wall to replace the lost water quality
volume. Ms. Cook-Weedon provided assistant during the project construction. She addressed shop drawing reviews, RFI’s and provided
frequent site visits to address issues with the contractor. Cost: $18,000 Construction cost estimated at $800,00.
2015 - 2017 2017
67
m.
19. RELEVANT PROJECTS (CONT.)
k.
j.
i.
l.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 TAMMy COOk-WeeDON
Vista Park
Weston, Florida
CGA developed the master plan for Vista Park, which is adjacent to Cypress Bay High School. With four soccer fields and four baseball
fields, this park is well utilized by Weston residents as well as the high school. Special detailing of the edges of the fields were designed to
address the clay and sod areas by creating header curbs to separate those areas. The design, construction documents and construction
administration was provided by CGA. Cost: $5.5 Million.
2009
kane Concourse Beautification
Bay Harbour Islands, Florida
Landscape Architect: Responsible for the oversight of hardscape and planting of streetscape improvements for the Town’s business
district, including street furnishings, wayfinding, and irrigation.
2010 N/A
Delray Beach Ne 2nd Avenue
Delray Beach, Florida
As a subconsultant to Wantman Engineering, CGA provided professional services for Landscape Architecture and Electrical Engineering
Streetscape enhancements were provided from Lake Ida Rd. to George Bush Blvd. Decorative street lighting as well as date palms were
designed to complement the historic neighborhood of Delray Beach.
2016
Delray Beach SW 2nd Street
Delray Beach, Florida
As a subconsultant to Wantman Engineering, CGA coordinated the bulb-out locations with the Civil Engineer. Roundabouts were developed
for Traffic Calming. Landscape Streetscape enhancements provided beautification in the South West neighborhood. The project extended
from Swinton to SW 15th Avenue. Construction Cost: $408,000
2014
Sombrero Beach Park
Marathon, Florida
CGA redesigned the park to expand its programming for recreational uses, enhance its environmental condition as a turtle nesting
habitat, and provide new on-site amenities that were sensitive to the architectural character of the Florida Keys. The redesign for the park
expanded the program for the park to include extensive, walkable circuits for pedestrian use, children’s playground and play equipment,
restroom facilities, new gateway and controlled access features, added picnic shelters, volleyball courts, and multiple-use open public
spaces that lend themselves to the personalization of the park by the visitors. Cost: $230,000.00 Construction cost estimated at $2
million.
2003 2005
68
c.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete One Section E for Each Key Person.)
12. NAME
16. EDUCATION (Degree and Specialization)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
15. FIRM NAME AND LOCATION (City and State)
13. ROLE IN THIS CONTRACT
a. TOTAL b. WITH CURRENT FIRM
14. YEARS OF EXPERIENCE
19. RELEVANT PROJECTS
a.
b.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 GiANNO FeOli
GIANNO FEOLI
Calvin, Giordano & Associates, inc.
Master of landscape Architecture
B.A. in Architectural Studies
Fort Lauderdale, FL
Florida International University, Miami, FL
Florida International University, Miami, FL
Mr. Feoli leads the Landscape Department in creative design strategies for urban environments with specialties including urban design,
contextual analysis and branding. He will contribute his experience in providing detailed site design, large-scale redevelopment planning,
and graphic communication services. His experience has encompassed a wide array of project-types, and his strengths lie in park design,
streetscapes and urban redevelopment, and form-based urban designs and planning strategies.
LANDSCAPE URBANIST 25 18
Middle Beach Recreational Corridor - Phase ii
Miami Beach, Florida
Lead Designer: responsible for coordinating all engineering and environmental efforts associated this 2-mile long linear multi-use trail
project on State- owned lands, as well as responsible for all planting and hardscape design and public outreach. Conducted one-on-one
meetings with over 39 condominium properties to gather support for the project, responded to residents’ concerns, and addressed
design restrictions set forth in the Florida Administrative Code and balance those against resident’s expectations. Responsible for
coordinating with all State and local permitting agencies CGA’s fees: $534,000.
2011 2019
Oakland Park Station
Oakland Park, Florida
Responsible for all conceptual design, site, design and construction detailing of a public plaza at the terminus of the City’s culinary
district. The design effectively created flexible public environment that could be used as event spaces and could accommodate the
needs of the City in continuing its adopted branding through the use of elements, furnishings, paver palettes and landscape lighting. The
project’s challenging shallow dimensions required innovative solutions to address ADA access to adjacent buildings while maximizing
opportunities for the use of space, addressed through the creation of large stage settings that served as landings and allowed for public
engagement and interaction. CGA’s fees: $25,000.
2012 2014
98th Street Park
Bay Harbor Islands, Florida
Responsible for all public outreach, site design, construction detailing, and planting design of a neighborhood passive park. The park
includes a small dog park area, flexible open space, children’s play areas, an interactive water feature and a restroom facility. Designed
the splash pad, play areas, and landscaping. Coordinated the design of the restroom facility and facilitated all necessary public outreach
through both the Parks and Recreation Committee and the Town Council. CGA’s fees: $42,000.
2013 2014
69
h.
19. RELEVANT PROJECTS (CONT.)
f.
e.
d.
g.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 GiANNO FeOli
Beachwalk Master Plan
Surfside, Florida
Lead Designer responsible for the conceptualization and master plan of a 1-mile linear park as a erosion control strategy and connecting
all street-end plaza components with access to the beach. This project included dune and turtle habitat restoration, branding sculptures,
salt-tolerant plantings, public art branding components, and specialty paving design. Also responsible for all public outreach associated
with the project. CGA’s fees: $60,000.
2006 N/A
Rolling Oaks Park Wayfinding Sign Package
Miami Gardens, Florida
Developed a signage and wayfinding package to provide identification and orientation to users. The signage package was developed as
an interchangeable modular system that could be easily customized to meet the unique needs of other park and public amenity areas and
that could be placed on project sites as well as within the public ROW. The design was heavily influenced by concerns of safety and its
ability to withstand graffiti and vandalism. CGA’s fees: $140,000.
2008 2012
92nd Street Park
Bay Harbor Islands, Florida
Lead Designer responsible for all public outreach, site design, construction detailing, and planting design of a 2-acre urban community
passive park. The park includes a small dog park area, flexible open space, outdoor exercise areas, ample shaded seating, parking,
furnishings, and urban plaza and solar- powered security lighting. This project was designed, engineered, detailed and constructed on a
fast-track to meet very restrictive deadlines of grant funding that had been previously secured by the Town. CGA’s fees: $40,000.
2008 2010
Doral Boulevard Beautification Master Plan
Doral, Florida
Lead Designer responsible for crafting a streetscape and urban design master plan for Doral Boulevard envisioned as the primary
emblem of the City. Responsible for designing all landscape and planning components of the project, which created distinct planning
‘character’ zones that would impact relationships of the built environment with the resultant quality of spaces being generated, the
creation of dedicated public realm components and design standards for each, access management design recommendations, signage
and gateway features, and identifying architectural relationships to improved sidewalk design and parking design recommendations.
This document and its vision has been the guiding document for all areas abutting the Boulevard and has been used by the City as a
contributing guide for the development of Downtown Doral, focused on safe, pedestrian-friendly, high-quality environments.
2004 2013
lloyd estate Pocket Park Project
Oakland Park, Florida
Responsible for the programming and design of the project site, conducting the necessary public outreach to gather Commission
approval and coordinating important aesthetic and sustainable improvements with engineering needs of the project. Also responsible
for the conceptual design of all material selections and palette, retaining walls, fences, lighting, branding elements, and planting. CGA’s
fees: $65,000
2011 2019
70
m.
19. RELEVANT PROJECTS (CONT.)
k.
j.
i.
l.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 GiANNO FeOli
174th Street Park Bridge Vision Package
Sunny Isles Beach, Florida
Project Manager/Lead Designer: Responsible for the conceptualization of the bridge and managing the development of all needed graphics
to convey the project. Responsible for obtaining a pre-acceptance of the design approach from FDOT-District 6 for an open-air, elevated
pedestrian bridge designed more as a park than a caged walkway; Responsible for obtaining acceptance from FDOT for developing a
design strategy that did not require the use of metal fencing enclosures; Responsible for all public presentations to the community and
to the commission for feedback and approvals.
2019 N/A
SW 2nd Ave Himmarshee District Streetscape
Fort Lauderdale, Florida
Project Manager/Lead Designer: Responsible for conceptualizing the streetscape and developing a strategy that reinterpreted the
streetscape into an ‘event space’ that was supportive of the existing restaurants and nightclub and bars located in the area. As such, the
streetscape was redesigned as a curbless ‘woonerf’. Responsible for the coordination and development of all construction documents.
Responsible for coordinating all construction administration support efforts with the Client’s third-party CEI consultant.
2018 2019
Urban Forestry Master Plan
Miami Beach, Florida
Account Manager/Lead Urbanist: Responsible for the development of a city-wide strategy to implement constructability components of
the urban forestry master plan through the development of a ‘tool kit’. The ‘tool kit’ satisfied the Planning Department’s needs to establish
a city-wide hierarchy for street tree types, establishes standards for incorporating green infrastructure in the planting of city trees,
establishes standards for soil volume calculations and stresses the need to have those accounted for during the scoping and budgeting
processes, provided for appropriateness of canopy specie selection for good resilient diversity, and provided constructatbility details to
be incorporated into the Public Work’s set of standards.
Ongoing N/A
Middle Beach Recreational Corridor - Phase iii
Miami Beach, Florida
Account Manager/Lead Designer: Responsible for coordinating all design, engineering and environmental efforts associated the
replacement of the existing wooden boardwalk with an on-grade, paver pathway, as well as responsible for all planting and hardscape
design. Additionally, the project included the redesign of 11 street ends to provide ADA accessibility, seating areas and beach shower
facilities. Participated in one-on-one meetings with all properties prior to construction, responded to residents’ concerns, and addressed
design restrictions set forth in the Florida Administrative Code and balanced those against resident’s expectations. Responsible for
coordinating with FDEP, FWC, and City of Miami Beach Departments in obtaining all necessary permits; was capable of getting all above-
ground pedestrian pole lights approved by FWC.
2015 Ongoing
North Beach Oceanside Park and Beachwalk
Miami Beach, Florida
Account Manager/Lead Designer: Responsible for implementing the vision for the park that was collaboratively arrived at in a partnership
with West 8. Responsible for the coordination of all City-departments’ request and working closely with CIP staff in the separate
development and permitting of the beachwalk component. Responsible for successfully obtaining a CCCL permit for both the park and
the beachwalk separately through FDEP and FWC; was capable of getting all above-ground pedestrian pole lights approved by FWC.
2015
71
c.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete One Section E for Each Key Person.)
12. NAME
16. EDUCATION (Degree and Specialization)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
15. FIRM NAME AND LOCATION (City and State)
13. ROLE IN THIS CONTRACT
a. TOTAL b. WITH CURRENT FIRM
14. YEARS OF EXPERIENCE
19. RELEVANT PROJECTS
a.
b.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 MichAel cONNeR
MICHAEL D. CONNER, ASLA, PLA, ISA
calvin, Giordano & Associates, inc.
BSlA Registered landscape Architect Florida
B.S., environmental Design iSA certified Arborist, Florida
Fort Lauderdale, FL
Ball State University, Muncie, IN No. LA0001181
Ball State University, Muncie, IN No. FL0777
Professional Associations: American Society of Landscape Architects Chairperson 1990 Broward Section; Florida Urban Forestry Council
President 1999; Landscape Inspectors Society of Florida; International Society of Arboriculture.
LANDSCAPE ARCHITECT 30+15+
lift Station #21 - Reconstruction
Cooper City, Florida
Project Landscape Architect: Prepared design renderings, construction drawings, and bid specifications for the landscape and irrigation
improvements for the relocation and reconstruction of an existing lift station in the Rock Creek community of Cooper City. This included
assessing the existing trees, providing a tree preservation plan, and then working with the existing trees and landscaping to prepare a new
planting design that would effectively screen the new lift station and blend it into the look and aesthetic of the community.
2016 - 2018 2018
Natalie’s cove/Flamingo Gardens - Drainage improvements
Cooper City, Florida
Project Landscape Architect: Team member responsible for inventorying all the existing trees within the project limits and preparing root
management plans, construction drawings, and bid specifications for the preservation of those trees. This included overseeing all root
pruning and tree canopy pruning activities before and during construction. The design also included the installation of new littoral shelf
plantings around the portions of the lake that were excavated to increase the drainage capacity for the surrounding neighborhoods.
2018 - 2019 2019
city Arborist / Urban Forester
Cooper City, Florida
Served as the City’s Landscape Architect and City Arborist for ten years and supervised the development and expansion of the City’s
Urban Forestry Program. Secured numerous Urban & Community Forestry Grants to conduct a tree inventory and prepare an Urban
Forestry Master Plan for the City, as well as several tree planting projects and public information seminars to educate the residents on the
City’s Urban Forestry Program. The tree inventory included over 15,000 trees utilizing a software program from ACRT, Inc. and resulted
in the development of a Work Order program for scheduling and tracking tree pruning activities.
1990 - 2000
72
h.
19. RELEVANT PROJECTS (CONT.)
f.
e.
d.
g.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 MichAel cONNeR
Mills Pond Park: Soccer/lacrosse Fields
Fort Lauderdale, Florida
Developed a plan to build 3 new synthetic turf soccer and lacrosse fields at Mills Pond Park, including coordinating surveying, civil
engineering, electrical engineering, site planning, landscape architecture, and all of the sub-consultants on the project. The design
of the new fields includes drainage, lighting, and irrigation as well as associated parking, walkways, and landscape improvements.
Construction cost is $3.7 million, with completion scheduled for February, 2018.
2015 2018
Parks Bond - construction Management
Miami Gardens, Florida
Project Manager, Lead Designer – Assisting the City staff with the implementation of a $60 million bond program for parks improvements.
This includes conceptual site designs, cost estimates, and development of all design-build standards and specifications for 14 parks
city-wide. Five of the parks in Phase One of the program are currently under construction, and another five parks have been designed
and are in the site plan approval.
2014 Ongoing
Peace Mound Park
Weston, Florida
Project Manager, Lead Designer - Responsible for the design detailing and construction administration of a waterfront passive park with
the purpose of ensuring celebrating the existence of an archaeological Tequesta Indian burial mound. Mr. Conner was responsible for
conducting an audit of over 200 existing trees, determining their health and relocation parameters and coordinating the mitigation of any
vegetation that needed to be removed.
2012 2014
Andrews Avenue improvements - Transportation enhancement Grant
Oakland Park, Florida
Lead Designer - Developed a new planting and irrigation design for the major improvements to the Broward County roadway through the
City of Oakland Park as part of a Broward MPO Grant. Mr. Conner was responsible for all permitting and coordination of approvals through
various agencies, as well as the City of Oakland Park’s review process. The design for the roadway includes new medians, reduced lane
sizes, and new bike lanes in addition to the landscape enhancements.
2017 2019
SR A1A - Beautification Grant
Fort Lauderdale, Florida
Project Manager, Lead Designer - Prepared construction drawings and bid specification for the landscape and irrigation improvements
in the medians on S. R. A1A south of East Oakland Park Boulevard. This included implementing a Florida Highway Beautification Council
grant and obtaining all approvals of the plans from FDOT. The design intent was to transform this section of S.R. A1A to a more updated
look by removing some old existing Black Olive trees and planting mature Coconut Palms.
2015 2017
73
m.
19. RELEVANT PROJECTS (CONT.)
k.
j.
i.
l.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 MichAel cONNeR
John U. lloyd State Park - Boardwalk Replacement
Florida Department of Environmental Protection (FDEP)
Lead Designer - Responsible for the design and detailing for the construction of three new boardwalk replacements at various beach
access locations within the Park. Coordinated with the Environmental Specialist on the Environmental Permitting for the oceanfront beach
park in Hollywood, Florida, and the civil and structural engineers on the design and specifications for the boardwalks. This included
utilizing the existing piles and coordinating the replacement of the wood deck with the recycled decking material and vinyl wire mesh on
the sides per the FDEP standards.
2015 2016
Regional Park - Synthetic Turf Fields
Weston, Florida
Contributed to the preparation of the construction drawings and bid documents for the conversion of two existing soccer fields at
Weston’s Regional Park to synthetic turf fields with organic infill material. This included supervision the design of irrigation system and
the required electrical design and power supply for the booster pump to be able to periodically wet the fields from the sidelines.
2017 2018
Patch Reef Park - Synthetic Turf Fields
Boca Raton, Florida
Lead Designer - Contributed to the preparation of the construction drawings and bid documents for the conversion of three existing
football/lacrosse/soccer fields at Patch Reef Park to synthetic turf fields for the Boca Raton Beach & Parks District. This included tree
relocations, new landscaping and design of the irrigation system and the required electrical design and power supply for the booster
pump to be able to periodically wet the fields from the sidelines. The construction was completed in less than 7 months.
2017 2019
Davie Road Phase i and ii
Davie, Florida
Lead Designer - Prepared landscape and irrigation design for the new medians as part of a road widening and complete streets project
for Davie Road from Nova Drive to I-595. This included coordinating the relocation of several large Royal Palms from the roadway to a
few nearby parks in the Town of Davie.
2016 2018
Miami Beach Urban Forestry Master Plan
Miami Beach, Florida
Lead Arborist – Developed an Urban Forestry Master Plan with the Davey Resource Group. Coordinated with City staff and residents to
draft a plan that will be essential in managing the City’s trees in the future, and will establish canopy coverage goals and recommendations
for a more sustainable urban forest.
2019 Ongoing
74
r.
19. RELEVANT PROJECTS (CONT.)
p.
o.
n.
q.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 MichAel cONNeR
Rolling Oaks Park - Pedestrian Trail
Miami Gardens, Florida
Designed a 1.5 mile long pedestrian trail through Rolling Oaks Park. The trail included new L.E.D. site lighting, fitness equipment, and
benches. A custom-designed way-finding signage program was developed for all of the trailheads signs, directional signs, and mileage
markers. The design of the trail was carefully laid out so as to not disturb the hundreds of existing like oak trees on the site. The new trial
was connected to an existing trial 3/4 mile away through neighborhood signage.
2012 2014
capital improvement Program (ciP) - implementation
Weston, Florida
Landscape Architect - Contributing team member with City staff responsible for the development and implementation of the City’s 5 and
10 Year CIPs, with an emphasis on the Parks and Recreation components, as well as the Roadway and Landscaping improvements.
Designed and assisted with the construction of several municipal buildings, new and existing parks, City-wide tree inventory, streetscape
designs, and traffic signage program.
2004 2015
Memorial Regional hospital - 35th Avenue Streetscape
Hollywood, Florida
Lead Designer - Responsible for the construction detailing of hardscape components and planting for a streetscape design and wayfinding
for a re-dedicated roadway segment to the hospital campus as part of this LEED-Gold project.
2011 2012
Pines Boulevard - Beautification Grants - Phase i and ii
Pembroke Pines, Florida
Project Manager, Lead Designer – Prepared detailed construction drawings and specifications for the landscape and irrigation
improvements on two segments of Pines Boulevard east of the Florida Turnpike in Pembroke Pines. This included implementing two
Florida Highway Beautification Council grants and obtaining all approvals of the plans from FDOT. In addition, a Design Variance was
obtained for the preservation of several existing large Royal Palms located in the medians.
2014 2017
75
c.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete One Section E for Each Key Person.)
12. NAME
16. EDUCATION (Degree and Specialization)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
15. FIRM NAME AND LOCATION (City and State)
13. ROLE IN THIS CONTRACT
a. TOTAL b. WITH CURRENT FIRM
14. YEARS OF EXPERIENCE
19. RELEVANT PROJECTS
a.
b.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 MARcOS MeNDOzA
MARCOS MENDOZA
calvin, Giordano & Associates, Inc.
A.A. IN ARcHITecTURe
Fort Lauderdale, FL
Miami Dade Community College, Miami, FL
Mr. Mendoza directs the landscape architectural staff in all code compliance and site design issues. His expertise lies in the production and
development of several residential communities and large-scale commercial projects. He assists in quality control of project documents
through developments in standards and systems consultation. He has also had experience in the development of institutional, educational and
healthcare projects. Marcos provides the Irrigation Designs for CGA’s projects.
IRRIGATION/SITE DESIGN 24 20
Mills Pond Park: Soccer/Lacrosse Feilds
Fort Lauderdale, Florida
Developed a plan to build 3 new synthetic turf soccer and lacrosse fields at Mills Pond Park, including coordinating surveying, civil
engineering, electrical engineering, site planning, landscape architecture, and all of the sub-consultants on the project. The design of
the new fields will include drainage, lighting, and irrigation as well as associated parking, walkways, and landscape improvements.
Construction cost is estimated at $3.3 million. CGA’s fees: $379,000.
2014 - 2018 2018
Soccer Field conversion at Weston Regional Park
Weston, Florida
The City of Weston will be converting two soccer fields to synthetic turf, these conversions will be the first of two park field conversions
in the city. The selected synthetic turf option uses an organic infill material rather than the standard black rubber material. These fields
will be cooled down with the use of long range rotors specifically designed for synthetic turf cooling & cleaning. Services included Civil
Engineering as well. CGA’s fees: $350,000.00.
2016 2018
Football Field conversion at cypress Bay High School
Weston, Florida
Prepared detailed site plans and irrigation plans for the conversion of an existing turf football field park to synthetic turf. The selected turf
option is to use an organic fill material rather than the standard black rubber material. This required a cooling system and for cost saving
a specialized booster pump with 4 custom ports where created in order to use a self-reeling watering wheel system. Services included
Civil Engineering as well. CGA Fees: $100,000.
2015 2017
76
h.
19. RELEVANT PROJECTS (CONT.)
f.
e.
d.
g.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 MARcOS MeNDOzA
Memorial West - Bed Tower Addition
Pembroke Pines, Florida
Developed plans and coordinated details for the hardscape, as well as planting and irrigation design for the major expansion of the
Memorial West Hospital facilities. Design of the landscaping and irrigation around the new building addition and main entrance into the
hospital, as well as all of the permitting through the City of Pembroke Pines.
2011 2012
Memorial Regional Hospital Data center
Hollywood, Florida
Developed plans and details for the relocation of vegetation and new planting associated with a data center facility along the boundary
areas of the healthcare campus.
2005 2007
Joe DiMaggio children’s Hospital Vistor’s clubhouse - connie’s corner
Hollywood, Florida
Developed plans and details for the design of a restorative garden with a playground area specifically for the use by children users of the
Joe DiMaggio facility. Special attention was made to the creative design process branding and the selection of equipment, furnishing and
site design details that accommodated for at-grade-level activities for wheelchair-bound users. The design concept for the park initiated
from the checkerboard pattern of a mowed baseball field which influenced the safety surface design and provided a colorful impact for
the patients and families of this important facility.
2000 2000
Middle Beach Recreational corridor
Miami Beach, Florida
Responsible for all irrigation design for a 2-mile long multi-use trail linear park to be constructed on State lands. The irrigation design
is consistent with the City’s standards for product selection, specification and maintenance. The system was designed for water
conservation strategies and minimal impacts to the environment. CGA’s fees: $534,000.
2012 Ongoing
Vista Park
Weston, Florida
CGA developed the master plan for Vista Park which is adjacent to Cypress Bay High School. With four soccer fields and four baseball
fields, this park is well utilized by Weston residents as well as the high school. Special detailing of the edges of the fields were designed to
address the clay and sod areas by creating header curbs to separate those areas. The design, construction documents and construction
administration was provided by CGA. Cost: $5.5 million.
2002 2006
77
c.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete One Section E for Each Key Person.)
12. NAME
16. EDUCATION (Degree and Specialization)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
15. FIRM NAME AND LOCATION (City and State)
13. ROLE IN THIS CONTRACT
a. TOTAL b. WITH CURRENT FIRM
14. YEARS OF EXPERIENCE
19. RELEVANT PROJECTS
a.
b.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 MARiA AlONSO
MARIA A. ALONSO, NCIDQ, ASID, ASLA
Calvin, Giordano & Associates, inc.
Master of landscape Architecture
B.A. interior Design Studies
interior Designer
Fort Lauderdale, FL
Florida International University, Miami, FL
NCiDQ No. 34093
The Art Institute of Fort Lauderdale, FL
No. ID6618
Maria Alejandra is a Landscape Design professional, with over five (5) years of experience in landscape design, including park and planting
design for both publicly-funded and private projects. She contributes her experience in the creation of communication graphics, 3-dimensional
renderings, providing schematic designs, and the development of construction technical drawings.
LANDSCAPE DESIGNER 5+3+
North lauderdale Gateway Park
North Lauderdale, Florida
Landscape Designer, CAD Technician. Developed a design for a linear park for passive recreational use that will include an outdoor fitness
area, playground area and a butterfly garden for educational purposes.
2015 - 2016 N/A
Tamarind Avenue Streetscape
West Palm Beach, Florida
CAD Technician. Provided rendering of typical street sections with new planting material along with the selection of site furnishings,
lighting and bike racks to improve Tamarind Avenue.
2016 N/A
Mills Pond Park
Fort Lauderdale, Florida
Landscape Designer, CAD Technician. Developed a set of working drawings and illustration boards for the design, permitting, and
construction of three (3) new soccer/lacrosse fields at the existing park.
2015 - 2018 2018
78
h.
19. RELEVANT PROJECTS (CONT.)
f.
e.
d.
g.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 MARiA AlONSO
indian Creek
Miami-Dade, Florida
Landscape Designer. Developed a preliminary design of conceptual site plan for a promenade focused on enhancing pedestrians’
experiences through ample sidewalks, furnishings, plazas and water features. Performed technical tasks including the preparation of site
plan rendering, sections and furnishing selections.
2017
Key Biscayne Civic Park
Key Biscayne, Florida
Contributing Designer. Developed preliminary site plan designs and performed technical tasks, including the preparation of preliminary
site plan and section renderings and illustration boards for the proposed improvements to this park.
2015 - 2016
Betty T. Ferguson Recreational Complex
Miami Gardens, Florida
Landscape Designer. Prepared preliminary site layouts through schematic and design development phases for the additional parking and
other improvements being proposed for the existing athletic facility.
2018
Senior Family Center
Miami Gardens, Florida
Landscape Designer. Created preliminary layout designs through schematic and design development phases. Developed conceptional
site plans for the purpose of soliciting proposals from potential design/build teams.
2018
Windmill Park
Coconut Creek, Florida
Landscape Designer, CAD Technician. Developed site plans, and prepared construction documents, including construction details and
technical specifications for the improvements to this park.
2017 2019
79
c.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete One Section E for Each Key Person.)
12. NAME
16. EDUCATION (Degree and Specialization)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
15. FIRM NAME AND LOCATION (City and State)
13. ROLE IN THIS CONTRACT
a. TOTAL b. WITH CURRENT FIRM
14. YEARS OF EXPERIENCE
19. RELEVANT PROJECTS
a.
b.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 DOMiNic MAck
DOMINIC JAMES MACK III, ASSOC. ASLA
calvin, Giordano & Associates, inc.
Master of Landscape Architecture
Fort Lauderdale, FL
Florida International University, Miami, FL
Dominic is a Landscape Design professional, with over 3 years of experience in landscape and urban design, including park design and planting
design for both publicly-funded and private projects. He contributes his experience in the creation of communication graphics, 3-dimensional
renderings, providing schematic designs, fabrication strategies pairing with parametric design, and the development of construction technical
drawings.
Professional Affiliations:
• Associate Member, American Society of Landscape Architects (ASLA)
• Member-at-Large for Public Relations and Marketing, ASLA Florida Executive Committee
• Leadership Committee, Future Landscape Architects of America
LANDSCAPE DESIGNER 3 2+
SW 2nd Avenue Streetscape Project FTL DDA
Fort Lauderdale, Florida
Contributing Designer: Developed conceptual design through 3-dimensional renderings and other visual communication methods, and
performed technical tasks including preparation of site plan drawings, fabrication strategies, and construction document detailing.
Contributed to the selection of materials, palettes, lighting and branding elements. Assisted in the review of shop drawings and
construction inspections.
2019 2020
Middle Beach Recreational corridor Phase iii
Middle Beach, Miami Beach, Florida
Contributing Designer: Performed technical tasks including preparation of site plan drawings, fabrication strategies, and construction
document detailing.
Ongoing Ongoing
North Beach Oceanside Park
North Beach, Miami Beach, Florida
Contributing Designer: Developed a preliminary design of conceptual site plan for the two main gateway plazas and continued developing
the park site plan. Performed technical tasks including construction detail drawings of key park entities. Contributed to the selection
of materials, palettes, lighting and branding elements. Developed 3-dimensional renderings and other visual communication methods.
Ongoing
80
h.
19. RELEVANT PROJECTS (CONT.)
f.
e.
d.
g.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 DOMiNic MAck
Sunny isles Beach Pedestrian Overpass Study
Sunny Isles Beach, Florida
Contributing Designer: Developed a preliminary design of conceptual site plan and 3-dimensional modeling. Prepared visual presentations
for conceptual strategies for visioning the pedestrian overpass. Technical tasks include: preparation of site plan drawings and 3-dimensional
modeling and rendering visualizations.
2018
North Bay Road Pedestrian Bridge
Sunny Isles Beach, Florida
Contributing Designer: Performed technical tasks including preparation of site plan drawings, fabrication strategies, and construction
document detailing.
2018 2016 - 2018
90th and 91st Streetscape Study
Cooper City, Florida
Contributing Designer: Performed technical tasks including preparation of site plan drawings, fabrication strategies, and construction
document detailing.
2017 N/A
key Biscayne civic Park
Key Biscayne, Florida
Contributing Designer: Developed a preliminary design of conceptual site plan for a promenade focused on enhancing pedestrians’
experiences through ample sidewalks, furnishings, plazas and water features. Performed technical tasks including the preparation of
site plan rendering, Sections and furnishing selections. Designed and developed fabrication strategies on key sculptural components,
including parametric 3-dimensional modeling.
Ongoing
81
c.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete One Section E for Each Key Person.)
12. NAME
16. EDUCATION (Degree and Specialization)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
15. FIRM NAME AND LOCATION (City and State)
13. ROLE IN THIS CONTRACT
a. TOTAL b. WITH CURRENT FIRM
14. YEARS OF EXPERIENCE
19. RELEVANT PROJECTS
a.
b.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 MOhAMeD MAbROuk
MOHAMED MABROUK, PE
Calvin, Giordano & Associates, Inc.
bachelor of Science in Civil engineering Professional engineer - Florida
MS in Civil engineering and engineering Management
Fort Lauderdale, FL
Florida International University, Miami, Florida No. 74614
Florida International University, Miami, Florida
TIN #M162554834530
CTQP: QC Manager; Advanced MOT; Asphalt Paving Level 1 & Level 2; Final Estimates Level 1 & Level 2; FDOT LAP Checklist Training;
Stormwater, Erosion and Sedimentation Control; BCI Coatings Level 1 & Level 2
CEI SENIOR PROJECT ENGINEER 13 3
bid Pack 9 Infrastructure Improvements
Oakland Park, Florida
Senior Project Engineer/Contract Administration. The project encompasses approximately 570 acres, the project boundaries are east of
Dixie Highway, west of Federal Highway, north of NE 38th Street and south of NE 50th Court. This project includes drainage improvement,
water main replacement, sewer force main replacement, rehabilitation of Lift Station B-2, Lift Station #3, Lift Station #4, sidewalk
installation, roadway improvements and resurfacing. Cost: $9,640,779.41
2015 2016
NW 110th Ave Road Improvements
Coral Springs, Florida
Senior Project Engineer. Contract elements included; contract administration, inspection, material sampling and testing for the NW 110th
Avenue Bicycle and Pedestrian Project, which narrowed the existing 12-ft travel lanes to 11 ft and constructed a 5-ft wide sidewalk, a
4-ft bicycle lane, drainage structures and curbing. The existing valley gutter was removed & restored, roadway milled and resurfaced,
landscaping and irrigation lines repaired. Cost: $1,599,491.63
2017 2018
beach Walk II Phase II (LAP Funded)
Miami Beach, Florida
Senior Project Engineer. This project consisted of the construction of an ongrade ADA compliant pedestrian paver walkway, with bollard
lights, landscaping and irrigation. Other work consists of exotic dune vegetation removal and replacement with dune enhancements such
as native
2018 2019
82
h.
19. RELEVANT PROJECTS (CONT.)
f.
e.
d.
g.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 MOhAMeD MAbROuk
MLk (hammondville Rd) Improvements (from Powerline Rd to Turnpike)
Pompano Beach, Florida
Project FM#432861-1-58-01
Senior Project Engineer/Contract Administration. Improvements include roadway widening, sidewalk installation, drainage improvements,
milling and resurfacing, lighting, median installation, signage, landscaping, irrigation and pavement markings. Cost: $3,554,121.43
2015 2016
expanded Lloyd estates Residential and Industrial Improvements
Oakland Park, Florida
Senior Project Engineer/Contract Administration. Project includes drainage improvements, water main replacement, installation of
flood gates, stormwater pump station and a tidal check valve. The drainage improvements include construction of roadside swales,
construction of new stormwater conveyance system piping networks and exfiltration trenches, modification of existing conveyance
systems and construction of a new out fall structures. Cost: $7,832,907.90
2015 2016
NW 57th Avenue Roadway Improvements Group
FDOT District 6, Florida
Assistant Resident Engineer. The contract included roadway widening, culvert installation, major utility work, drainage improvements,
signalization improvements, signing, pavement marking, and milling and resurfacing.
2013 2015
Department of environmental Protection; kemp Channel Span Replacement
Florida
Project FM #418396-1, FDEP Project #FS050
Senior Project Engineer/Contract Administration. Construction of the Kemp Channel Bridge Span replacement and retrofitting, located at
approximately Mile Marker 23.5. This project is to be a portion of the Florida Keys Oversea Heritage Trail State Park as described in the
approved Trail Master Plan dated August 2000. Cost: $1,868,000.00
2015 2016
83
c.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete One Section E for Each Key Person.)
12. NAME
16. EDUCATION (Degree and Specialization)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
15. FIRM NAME AND LOCATION (City and State)
13. ROLE IN THIS CONTRACT
a. TOTAL b. WITH CURRENT FIRM
14. YEARS OF EXPERIENCE
19. RELEVANT PROJECTS
a.
b.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 ERik PADRON
ERIK PADRON, PE
Calvin, Giordano & Associates, inc.
Bachelor of Science in Civil Engineering Professional Engineer - Florida
MS in Civil Engineering Strucutral
Fort Lauderdale, FL
University of Florida, Gainesville, Florida No. 59446
Florida International University, Miami, Florida
TIN#P3652007214
CTQP: QC Manager; Advanced MOT; Earthwork Level 1 & Level 2; Final Estimates Level 1 & Level 2; IMSA Traffic Signal Inspector Level 1
CEI SENIOR PROJECT ENGINEER 22 1+
Ocala Operations Center; Project FM #435659-2
FDOT District 4 - Ocala, Florida
Senior Project Engineer. Widening, milling and resurfacing of the I-75 ramps at SR-200. Also included drainage improvements, lighting,
signalization, earthwork, guardrail, barrier wall, curb and gutter, ADA improvements including sidewalks & ramp reconstruction,
landscaping, temporary traffic control and signal detection, litter removal, and mowing. MOT with 11 phases.
2018 2018
Hard Rock Stadium Pedestrian Bridges and Tunnels
Miami Gardens, Florida
Senior Project Engineer. 2 pedestrian bridges over TPK exit ramp & NW 199 St,2 tunnels under Don Shula Dr. Included: pile foundations,
MSE walls, drainage improvements, lighting, signalization improvements, signage & pavement markings, precast concrete, curb & gutter,
ADA sidewalk/ramps,landscaping,sod,irrigation,parking lot resurfacing, striping, and signing. plus pre-stressed, pre-cast concrete tunnel
segments, sheet piles. Super Bowl 2019. Cost $17 Million
2018 2019
Collins Avenue (SR A1A) Decorative Lighting (from Bayview Dr to 192nd St)
Sunny Isles, Florida
Senior Project Engineer. Project includes the removal of existing conventional lighting poles, installation of new pole foundations or
rehabilitation of existing pole foundations,installation of new decorative poles, installation of electrical conduits and wires and MOT
supervision. Cost: $4,830,000.00
2019 2019
84
h.
19. RELEVANT PROJECTS (CONT.)
f.
e.
d.
g.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 ERik PADRON
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firm
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firm
Sebring Operations Center; SR-70 Widening in Okeechobee County
FDOT District 1, Florida
Sebring Operations Center; SR-70 Widening in Okeechobee County (from NE Avenue to St. Lucie County line).
Resident Engineer. 8.1 miles of roadway widening from two lanes to four lane divided highway, building seven retaining ponds, drainage,
sidewalk and driveways. Contributions included helping along project progress, resolve disputes, enforce CPAM, documents and timely
submittals. Involved with resolving materials and field issues, recommendations, and worked with the staff to negotiate open issues.
2015 2016
Sebring Operations Center US-27 Bridge Rehabilitation
FDOT District 1, Florida
Resident Engineer. Improvements consisted of dredging on Lake Jackson, Sebring and rehabilitation of three bridge locations, under
bridge channel excavation, and under bridge rip-rap relocated by hand and with conveyor equipment.
2015 2016
85
c.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete One Section E for Each Key Person.)
12. NAME
16. EDUCATION (Degree and Specialization)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
15. FIRM NAME AND LOCATION (City and State)
13. ROLE IN THIS CONTRACT
a. TOTAL b. WITH CURRENT FIRM
14. YEARS OF EXPERIENCE
19. RELEVANT PROJECTS
a.
b.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 HugO DASilvA
HUGO DASILVA, PE
Calvin, giordano & Associates, inc.
Bachelor of Science in Civil Engineering, Polytechnic Professional Engineer - Florida
Professional Engineer - Puerto Rico
Fort Lauderdale, FL
University Hato Rey, Puerto Rico No. 73249
No. 11999
TIN#D241325671890
CTQP:Asphalt Paving Level 1;Asphalt Paving Level 2;Earthwork Level 1;Earthwork Level 2;ACI Concrete Field Testing 1;Drill Shaft;Final
Estimates Level 1;Final Estimates Level 2; Advanced MOT;LIMS Training; Nuclear Gauge Safety;IMSA Traffic Signal Inspector Level 1;OSHA
10hr; Stormwater, Erosion and Sedimentation Control
PROJECT ADMINISTRATOR 25 5
SW 36th Avenue Sidewalk improvements; FM #431715-1-58-01
Pompano Beach, Florida
Project Administrator/Senior Inspector. The project scope includes the installation of a sidewalk along the west side of SW 36th Avenue
commencing on the south end of Canal “A” north to Palm Aire Drive, a pedestrian flashing beacon crosswalk at the intersection of
SW 36th Avenue and Gateway Drive, storm drainage construction, demolition, utility work, and permanent signage & striping. Cost:
$628,755.50
2016 2017
NW 110th Avenue Road improvements (lAP Funded $1,495,915.00)
Coral Springs, Florida
Project FM # 435088-1-58-01
Project Administrator. Project elements included narrowing existing 12-ft travel lanes to 11 ft and constructing a 6-ft wide sidewalk, a 4-ft
bicycle lane, drainage structure installation and curbing, valley gutter was removed and restored. Roadway was milled and resurfaced,
landscaping, sidewalk and irrigation lines repaired. All improvements were constructed within City of Coral Springs right of way (ROW).
Cost $1,599,491.63
2017 2018
victoria Park Ph A (Project No. 10850) & victoria Park Ph B (Project No. 11901)
Fort Lauderdale, Florida
Project Administrator. Elements include; installing approximately 60,000 feet of 6-inch and 8-inch watermain to replace existing 2-inch
mains, including new fire hydrants, service connections to each home, & repaving of the roads impacted by the watermain improvements.
Also includes all restoration to landscaping, lawns, pavers, etc. that may have been disturbed due to the work. Cost $11 Million
2019 2019
86
h.
19. RELEVANT PROJECTS (CONT.)
f.
e.
d.
g.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 HugO DASilvA
Bid Pack 9 infrastructure improvements
Oakland Park, Florida
Project Administrator/Senior Inspector. The project encompasses approximately 570 acres, the project boundaries are east of Dixie
Highway, west of Federal Highway, north of NE 38th Street and south of NE 50th Court. This project includes drainage improvement,
water main replacement, sewer force main replacement, rehabilitation of Lift Station B-2, Lift Station #3, Lift Station #4, sidewalk
installation, roadway improvements and resurfacing. Cost $9,640,779.41
2015 2015
Expanded lloyd Estates Residential and industrial improvements
Oakland Park, Florida
Project Administrator/Senior Inspector. Project includes drainage improvements, water main replacement, installation of flood gates,
stormwater pump station and a tidal check valve. The drainage improvements include construction of roadside swales, construction
of new stormwater conveyance system piping networks and exfiltration trenches, modification of existing conveyance systems and
construction of a new out fall structures. Cost $7,832,907.90
2015 2016
87
c.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete One Section E for Each Key Person.)
12. NAME
16. EDUCATION (Degree and Specialization)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
15. FIRM NAME AND LOCATION (City and State)
13. ROLE IN THIS CONTRACT
a. TOTAL b. WITH CURRENT FIRM
14. YEARS OF EXPERIENCE
19. RELEVANT PROJECTS
a.
b.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 Felix GARciA
FELIX GARCIA, PE
calvin, Giordano & Associates, inc.
B.S. in civil engineering Professional engineer Florida
Fort Lauderdale, FL
University of Florida, Tallahassee, FL No. 72293
TIN#G62024180 CTQP: Asphalt Paving Level 1 & 2; Concrete Field Tech Level 1; Drilled Shaft; Earthwork Level 1 & 2; Final Estimates 1 & 2;
Pile Driving; QC Manager; ACI Level 1; Advanced MOT; FDOT LAP Checklist Training; Nuclear Gauge Safety Training; OSHA 10; IMSA Traffic
Signal Inspector Level 1; Stormwater, Erosion and Sedimentation Control
ASSISTANT PROJECT ADMINISTRATOR 14 4
Downtown Mobility Hub Streetscape improvements
Fort Lauderdale, Florida
Project Administrator. This project is located in an area of downtown Fort Lauderdale bound by Andrews Avenue, Broward Boulevard,
FEC tracks and NW 4th Street. This multi-modal hub will include, but is not limited to, asphalt paving, decorative concrete, bike lanes,
drainage installation, curb and gutter, lighting, tree relocations, landscaping and irrigation installation, pavement striping and crosswalk
improvements. Cost $2,359,635.57
2019 2020
Victoria Park Phase A & Phase B Watermain improvements
Fort Lauderdale, Florida
Victoria Park Phase A (Project No. 10850) & Victoria Park Phase B (Project No. 11901)
Assistant Project Administrator. Elements include; installing approximately 60,000 feet of 6-inch and 8-inch watermain to replace existing
2-inch mains, including new fire hydrants, service connections to each home, & repaving of the roads impacted by the watermain
improvements. Also includes all restoration to landscaping, lawns, pavers, etc. that may have been disturbed due to the work. Cost $11
Million.
2019 2019
Beachwalk ii Phase ii from 3rd Street to 5th Street (lAP Funded)
Miami Beach, Florida
Project Administrator. This project consisted of construction of an ongrade ADA compliant pedestrian paver walkway, with bollard lights,
landscaping and irrigation. Other work consists of exotic dune vegetation removal and replacement with dune enhancements such as
native dune vegetation species and beach compatible dune fill and irrigation for the landscaping. The path lighting installation meets
Florida Fish & Wildlife Commission’s marine turtle nesting requirements.
2017 2018
88
h.
19. RELEVANT PROJECTS (CONT.)
f.
e.
d.
g.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 Felix GARciA
Middle Beach Recretational corridor - Phase iii
Miami Beach, Florida
Project Administrator. This project consisted of construction of an ongrade ADA compliant pedestrian paver walkway, with bollard lights,
landscaping and irrigation. Other work consists of exotic dune vegetation removal and replacement with dune enhancements such as
native dune vegetation species and beach compatible dune fill and irrigation for the landscaping. The path lighting installation meets
Florida Fish & Wildlife Commission’s marine turtle nesting requirements.
2015 Ongoing
Middle Beach Recretational corridor - Phase ii
Miami Beach, Florida
Project Administrator. This project consisted of construction of an ongrade ADA compliant pedestrian paver walkway, with bollard lights,
landscaping and irrigation. Other work consists of exotic dune vegetation removal and replacement with dune enhancements such as
native dune vegetation species and beach compatible dune fill and irrigation for the landscaping. The path lighting installation meets
Florida Fish & Wildlife Commission’s marine turtle nesting requirements.
2011 2019
MlK (Hammondville Road) improvements (from Powerline Road to Turnpike)
Pompano Beach, Florida
Project FM #432861-1-58-01
Project Administrator. Improvements include roadway widening, sidewalk installation, drainage improvements, milling and resurfacing,
lighting, median installation, signage, landscaping, irrigation and pavement markings. Cost: $3,554,121.43
2015 2016
School Zone Pedestrian Safety Program
Various Locations (Broward County), Florida
LAP Funded $2.4 M; FHWA; FM #4328661
Project Administrator. Roadway improvements, including pavement, pedestrian facilities, drainage, water and sewer, lighting, etc.,
overhead school zone flashers conversions to structural mast arms, including solar power conversions and relocation of school zone
infrastructure to match modified school zone limits, conversion of non-flashing school signs to flflashing signs, including solar power
installation, pedestrian/bicycle/transit connector linkages, traffic, etc. Cost $2.4 M
2017 2017
89
c.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete One Section E for Each Key Person.)
12. NAME
16. EDUCATION (Degree and Specialization)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
15. FIRM NAME AND LOCATION (City and State)
13. ROLE IN THIS CONTRACT
a. TOTAL b. WITH CURRENT FIRM
14. YEARS OF EXPERIENCE
19. RELEVANT PROJECTS
a.
b.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 BeRNNON ARTOlA
BERNNON ARTOLA
Calvin, Giordano & Associates, Inc.
High School Diploma
Fort Lauderdale, FL
Miami Coral Park High School
TIN#A634068772910
CTQP: Asphalt 1 & 2; Concrete Field Tech 1; Drilled Shaft, Earthwork 1 & 2; Final Estimates 1 & 2; QC Manager; Advanced MOT; ACI 1 & 2;
IMSA Traffic Signal 1; LIMS Training; MSE Wall Inspector; OSHA 10 Construction Training, Stormwater, Erosion and Sedimentation Control
PROJECT ADMINISTRATOR 15 2
expanded lloyd estates Residential and Industrial Improvements
Oakland Park, Florida
Senior Project Engineer / Contract Administration. Project includes drainage improvements, water main replacement, installation of
flood gates, stormwater pump station and a tidal check valve. The drainage improvements include construction of roadside swales,
construction of new stormwater conveyance system piping networks and exfiltration trenches, modification of existing conveyance
systems and construction of a new out fall structures. Cost $7,832,907.90
2015 2016
MlK (Hammondville Rd) Improvements (from Powerline Rd to Turnpike)
Pompano Beach, Florida
Senior Project Engineer / Contract Administration. Improvements include roadway widening, sidewalk installation, drainage improvements,
milling and resurfacing, lighting, median installation, signage, landscaping, irrigation and pavement markings. Cost: $3,554,121.430
2016 2017
D/B SR 9A/I-95 (from NW 29 St to NW 131 St) Project FM #429300-3-62-01
FDOT District 6, Florida
Project Administrator. This project will reconstruct 3.041 miles of SR-9A/I-95 mainline pavement, shoulder pavement, on and off ramp
improvements, & drainage infrastructure improvements including trench drains to resolve spread related issues. In addition, the project
includes the construction of Express Lanes Emergency Stopping Sites in the median at 5 locations between NW 62nd St (MP 6.213) and
NW 131st St. (MP 10.511). Cost: $89,490,000.00
2016 Ongoing
90
h.
19. RELEVANT PROJECTS (CONT.)
f.
e.
d.
g.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 BeRNNON ARTOlA
Department of environmental Protection; Kemp Channel Span Replacement
Florida
Project FM#418396-1, FDEP Project #FS050
Senior Project Engineer / Contract Administration. Construction of the Kemp Channel Bridge Span replacement and retrofitting, located
at approximately Mile Marker 23.5. This project is to be a portion of the Florida Keys Overseas Heritage Trail State Park as described in
the approved Trail Master Plan dated August 2000. Cost $1,868,000.00
2015 2016
Bid Pack 9 Infrastructure Improvements
Oakland Park, Florida
Senior Project Engineer / Contract Admin. The project encompasses approximately 570 acres, the project boundaries are east of Dixie
Highway, west of Federal Highway, north of NE 38th Street and south of NE 50th Court. This project includes drainage improvement,
water main replacement, sewer force main replacement, rehabilitation of Lift Station B-2, Lift Station #3, Lift Station #4, sidewalk
installation, roadway improvements and resurfacing. Cost $9,640,779.41
2015 2016
91
c.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete One Section E for Each Key Person.)
12. NAME
16. EDUCATION (Degree and Specialization)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
15. FIRM NAME AND LOCATION (City and State)
13. ROLE IN THIS CONTRACT
a. TOTAL b. WITH CURRENT FIRM
14. YEARS OF EXPERIENCE
19. RELEVANT PROJECTS
a.
b.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 ERiN SuDMAN
ERIN SUDMAN
Calvin, Giordano & Associates, inc.
Bachelor of Landscape Architecture Landscape inspectors Association of Florida Certificate
Fort Lauderdale, FL
University of Florida, Gainesville, Florida No. 2018-0215
TIN#S355213817850
CTQP: Final Estimates Level 1; Final Estimates Level 2; OSHA 10 Hr Construction Training Course; Security Awareness Course; Stormwater,
Erosion and Sedimentation Control; FDOT LAP Checklist Training; Intermediate MOT; LIAF Landscape Inspector
PIO/LANDSCAPE INSPECTOR 13 10+
SW 36th Avenue Sidewalk Project (W McNab Rd to W Palm Aire Dr)
Pompano Beach, Florida
Project FM # 431715-1-58-01
Resident Compliance Specialist/CSS. The project scope included the installation of a sidewalk along the west side of SW 36th Avenue
commencing on the south end of Canal “A” north to Palm Aire Drive, a pedestrian lashing beacon crosswalk at the intersection of SW 36th
Avenue and Gateway Drive, storm drainage construction, demolition, utility work, and permanent signage & striping. Cost $ 689,618.00
2016 2017
NW 110th Avenue Road improvements; Project FM #435088-1-58-01 (LAP Funded)
Pompano Beach, Florida
RCS/CSS/Landscape Inspector.Project elements included narrowing existing 12-ft travel lanes to 11 ft and constructing a 6-ft wide
sidewalk, a 4-ft bicycle lane, drainage structure installation and curbing, valley gutter was removed and restored. Roadway was milled
and resurfaced, landscaping, sidewalk and irrigation lines repaired. All improvements were constructed within City of Coral Springs right
of way (ROW). Cost $1,599,491.63
2017 2018
Hard Rock Stadium Pedestrian Bridges and Tunnels
Miami Gardens, Florida
Project FM #’s 440858-1-58-01/440858-2-54-01
RCS/CSS/Landscape Inspector.2 pedestrian bridges over TPK exit ramp & NW 199 St,2 tunnels under Don Shula Dr. Included: pile
foundations, MSE walls, drainage improvements, lighting, signalization improvements, signage & pavement markings, precast concrete,
curb & gutter, ADA sidewalk/ramps,landscaping,sod,irrigation,parking lot resurfacing, striping, and signing. plus pre-stressed, pre-cast
concrete tunnel segments, sheet piles. Super Bowl 2020. Cost $17 Million.
2019 2019
92
h.
19. RELEVANT PROJECTS (CONT.)
f.
e.
d.
g.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 ERiN SuDMAN
NE 34th Court improvements (between NE 2nd Ave and 11th Ave)
Oakland Park, Florida
Project FM#Project FM # 429653-1-58-0
Inspector Aide/Landscape Inspector. This project included subsoil, demucking, earthwork, installation of storm drains, structures and
water mains. Infrastructure improvements both in public right-of-way and private property, included landscaping, driveway reconstruction,
milling and resurfacing, signing and marking, sidewalk installation, fences and other misc. items.Cost $2,890,356.00
2014 2015
MLK (Hammondville Road) improvements
Pompano Beach, Florida
Landscape Inspector/CSS. Improvements included roadway widening, sidewalk installation, drainage improvements, milling and
resurfacing, lighting, median installation, signage, landscaping, irrigation and pavement markings. Cost: $3,554,121.43
2016 2016
93
c.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete One Section E for Each Key Person.)
12. NAME
16. EDUCATION (Degree and Specialization)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
15. FIRM NAME AND LOCATION (City and State)
13. ROLE IN THIS CONTRACT
a. TOTAL b. WITH CURRENT FIRM
14. YEARS OF EXPERIENCE
19. RELEVANT PROJECTS
a.
b.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 ReyNAlDO AlFONSO
REYNALDO ALFONSO
Calvin, Giordano & Associates, Inc.
High School Diploma
Fort Lauderdale, FL
Antonio Guiteras High School, Cuba
TIN#A415720623389
CTQP: Asphalt Paving Level 1; Asphalt Paving Level 2; Concrete Field Tech Level 1; Concrete Field Tech Level 2; Drill Shaft; Earthwork 1;
Earthwork 2; Final Estimates 1; Pile Driving; Advanced MOT; IMSA Traffic Signal Tech Level 1; IMSA Traffic Signal Inspector Level 1; OSHA
10hr; Stormwater, Erosion and Sedimentation Control;
SENIOR INSPECTOR 18 5
Broward County School Zone Pedestrian Safety Program (Various locations)
Broward County, Florida
LAP Funded $2.4 M; FHWA; FM # 4328661
Senior Inspector. Roadway improvements, including pavement, pedestrian facilities, drainage, water and sewer, lighting, etc., overhead
school zone flashers conversions to structural mast arms, including solar power conversions and relocation of school zone infrastructure
to match modified school zone limits, conversion of non-flashing school signs to flashing signs, including solar power installation,
pedestrian/bicycle/transit connector linkages, traffic, etc. Cost $2.4 Million
2017 2017
D/B SR 9A/I-95 (from NW 29 St to NW 131 St) Project FM # 429300-3-62-01
FDOT District 6, Florida
Senior Inspector. Reconstruct 3.041 miles of SR-9A/I-95 mainline pavement, shoulder pavement, on and off ramp improvements, &
drainage infrastructure improvements including trench drains to resolve spread related issues. In addition, the project includes the
construction of Express Lanes Emergency Stopping Sites in the median at 5 locations between NW 62nd St (MP 6.213) and NW 131st
St. (MP 10.511). Cost $89 Million
2018 2018
Hard Rock Stadium Pedestrian Bridges and Tunnels
Miami Gardens, Florida
Project FM #’s 440858-1-58-01/440858-2-54-01
Senior Inspector.2 pedestrian bridges over TPK exit ramp & NW 199 St,2 tunnels under Don Shula Dr. Included: pile foundations,
MSE walls, drainage improvements, lighting, future signalization improvements, signage& pavement markings, precast concrete, curb
& gutter, ADA sidewalk/ramps,landscaping,sod,irrigation, parking lot resurfacing, striping, and signing. plus pre-stressed, pre-cast
concrete tunnel segments, sheet piles. Super Bowl 2019. Cost $ 17 Million
2019 2019
94
h.
19. RELEVANT PROJECTS (CONT.)
f.
e.
d.
g.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 ReyNAlDO AlFONSO
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firm
I-595 express Corridor Improvement P3 Project
FDOT District 4, Florida
Senior Inspector. The project extended from the I75/Sawgrass Expressway interchange to the I595/I95 interchange. The corridor
improvements consisted of tolled, reversible, ground-level express lanes within the median of I595, safety modifications to the I595/
Florida Turnpike interchange,continuous connection of SR 84 between Davie Road and SR 7/ US 441, auxiliary lanes on I595 with
combined ramps, cross-road bypasses and grade-separated entrances. Cost $1.25B
2011 2011
I-95 Rehabilitation Project (N & S Bound) Pavement Rehab
FDOT District 6, Florida
I-95 Rehabilitation Project (N & S bound) Pavement Rehab (from NW62 St to Golden Glades; FM # 430790-1/2-52-01
Senior Inspector. Project consisted of remove and replace crack- concrete-slabs (14k cy) gridding, saw-seal, (On/offramps) milling and
asphalt resurfacing, curb and gutter, ADA ramps; lighting, MOT, marking, placed loops, Signalization, striping and landscaping.
2014 2014
95
c.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete One Section E for Each Key Person.)
12. NAME
16. EDUCATION (Degree and Specialization)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
15. FIRM NAME AND LOCATION (City and State)
13. ROLE IN THIS CONTRACT
a. TOTAL b. WITH CURRENT FIRM
14. YEARS OF EXPERIENCE
19. RELEVANT PROJECTS
a.
b.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 LANce RObiNSON
LANCE ROBINSON
calvin, Giordano & Associates, inc.
McFatter Technical center
Fort Lauderdale, FL
Florida
TIN# R152521853710
CTQP: Asphalt Paving Level 1; Asphalt Paving Level 2; Concrete Field Tech Level 1; Drilled Shaft; Earthwork Level 1; Earthwork Level 2; Final
Estimates Level 1; Pile Driving
Other: Advanced MOT; ACI Level 1 (Concrete Field); ACI Level 2 (Transportation) (Scheduled); Commercial Vehicle License; IMSA Traffic
Signal Inspector Level 1; OSHA 10 Hour Construction Training Course; Nuclear Gauge Safety Training; Stormwater, Erosion and Sedimentation
Control
SENIOR INSPECTOR 13 3
Miami-Dade expressway Authority; (Gec-b) 83608 GiS confirmation ($1 Million)
Miami-Dade County, Florida
Senior Inspector. Mr. Robinson was performing GIS confirmation and final inspection of all roadway assets to be transferred to MDX.
Assets included are Lighting, Bridges, Sign Structures, ITS Components, DMS and ADMS systems, Roadway Limits, Fences (gates),
Lanscaping and Mowing Limits. Task involves the asset identification, location and GPS reading to then be transfer to final data base. All
assets must be tag and photograph for future retrieval.
2016 - 2017 2017
D/b SR 9A/i-95 (from NW 29 St to NW 131 St) Project FM# 429300-3-62-01
FDOT District 6, Florida
(Project cost $89,490,000): Senior Inspector. The Improvements under this Design-Build Contract consist of the replacement /
reconstruction of all concrete and/or Rigid pavement surface on SR-9/I-95 from north of NW 29th Street (M.P. 4.253) to north of NW
79th Street (M.P 7.294) in Miami-Dade County. The project will reconstruct 3.041 miles of SR-9A/I-95 mainline pavement, shoulder
pavement, on and off ramp improvements, & drainage infrastructure improvements including trench drains to resolve spread related
issues. In addition, the project includes the construction of Express Lanes Emergency Stopping Sites in the median at 5 locations
between NW 62nd St (MP 6.213) and NW 131st St. (MP 10.511).
07/2017 - 2018 2018
campbell Drive Grouping
FDOT District 6, Florida
Project FM #405575-6-52-01, 405575-7-52-01, 405575-8-52-01 (Project cost $16,353,016.96)
Senior Inspector. The Improvements under this Construction Contract consist of reconstruction of SR 998 (Campbell Drive) and SW
336 St (Davis Parkway) and milling and resurfacing along SR 9336 (Palm Dr.) from west of Krome Avenue to east of US-1, drainage
improvements, highway lighting, and reconstruction of 8 signalized intersections. The project will create a bypass from Krome to US-1
and remove truck traffic from the Homestead Historic Downtown District.
03/2020-Ongoing
96
h.
19. RELEVANT PROJECTS (CONT.)
f.
e.
d.
g.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 LANce RObiNSON
SR 826/SR 836 interchange D/b Finance ($595 Million)
FDOT District 6, Florida
Project included the design & construction of 46 bridges with over 4 million cubic yards of embankment. The 46 bridges consist of 32
FL I-Beam Category 1 bridges & 14 FL I-Beam & Steel Category 2 bridges (including 4 segmental bridges). The project’s scope include
6.8 million tons of dirt removal (approx. 300,000 dump truck loads), 30 miles of concrete pile length, 16 miles of drainage pipe, 8,636
tons of reinforcing steel, 180,000 tons of asphalt, 16 miles of bridge beams, 760,000 SF of retaining wall, 35,000 linear ft of guardrail,
& 5.7 miles of concrete wall separating traffic lanes. Mr. Robinson served as Roadway/Bridge Inspector & was promoted to Senior
Inspector. His responsibility included jack & bore recording, (LIMS) entry, embankment verification, MSE wall construction, monitoring
MOT devices, general roadway construction & casting yard inspection. One of the primary responsibilities for Mr. Robinson was the
inspection for cofferdam construction & dewatering operations. This was used for the bridge foundation limits & the embankment limits.
2009-2016 2016
US 27 (SR 25) from Palm beach county Line & broward county to SR-80
FDOT District 4
Inspector. This project involved selective clearing and grubbing, guardrail, drainage, landscaping, and asphalt. Mr. Robinson assisted
inspectors with daily record keeping, laboratory information management system entry and general roadway construction inspection.
Cost: $158 Million
2009 2009
Miami-Dade expressway Authority; Killian Parkway/SW 104th St
Miami-Dade County, Florida
Killian Parkway/SW 104th Street (from SW 112th to 108th Ave. – MDX 87404 4th Lane)($1Million):
Senior Inspector. Duties included; running estimates, verifying inspections and coordinating multiple areas for material testing and
inspections. Project consists of widening of Killian Parkway to add a fourth lane in the westbound direction. The fourth lane will allow
an exclusive right turn into Miami-Dade College. Project consisted on a selective clearing and grubbing, curb and gutter, concrete
separator, guardrail installation on the 87404 SB ramp, widening, complex signalization work, milling and resurfacing. In addition,
extensive coordination with a DMS system wide project was required to avoid field conflicts between contractors. Both projects were
on-going simultaneously. In addition, project included a major signalization improvement with multiple pedestrian crossings. Miami Dade
County Signals Division provided a record acceptance.
2015-2016 2016
97
c.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete One Section E for Each Key Person.)
12. NAME
16. EDUCATION (Degree and Specialization)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
15. FIRM NAME AND LOCATION (City and State)
13. ROLE IN THIS CONTRACT
a. TOTAL b. WITH CURRENT FIRM
14. YEARS OF EXPERIENCE
19. RELEVANT PROJECTS
a.
b.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 GARy CRAiG
GARY CRAIG
Calvin, Giordano & Associates, inc.
High School Diploma
Fort Lauderdale, FL
A. Crawford Mosley High School
TIN#C620299573690
CTQP: Asphalt Paving Level 1; Asphalt Paving Level 2; Concrete Field Tech Level 1; Concrete Field Tech Level 2; Drill Shaft; Earthwork 1 & 2;
Final Estimates 1 & 2; Pile Driving; QC Manager; Qualified Grouting Tech Level 1 & 2; Qualified Post Tensioning Tech Level 1 & 2; ACI Level
1 & 2; Advanced MOT
SR INSPECTOR/SR BRIDGE INSPECTOR 42 10+
SR A1A Bridge No. 860011 Over Hillsboro inlet;
FDOT District 4, Florida
Project FM # 425935-1-52-01/425935-1-52-02
Senior Inspector. Improvements include rehabilitation of existing span drive machinery including but not limited to drive motors, secondary
reducer and new span locks replacement, Bridge pier structural retrofit to accommodate a new (2) two story Tender House building,
replace east sidewalk with upgraded configuration, including new steel traffic rails and pedestrian rails from beginning of south approach
to end of north approach. Cost $7,765,531.75
2016 2017
North Bay Road Emergency Access Bridge & Seawall Mitigation
Sunny Isles Beach, Florida
Senior Bridge Inspector. Bridge was necessary as an alternate route for emergencies because north-south access is limited to Collins
Avenue, the bridge will be open to pedestrians and will provide an alternate evacuation route during hurricane and tropical storm events.
The bridge measures 263 feet by 39 feet wide with eight (8) feet over-water clearance for navigational access.
2016 2016
D/B SR 9A/i-95 (from NW 29 St to NW 131 St) Project FM #429300-3-62-01
FDOT District 6, Florida
Senior Inspector. Reconstruct 3.041 miles of SR-9A/I-95 mainline pavement, shoulder pavement, on and off ramp improvements, &
drainage infrastructure improvements including trench drains to resolve spread related issues. In addition, the project includes the
construction of Express Lanes Emergency Stopping Sites in the median at 5 locations between NW 62nd St (MP 6.213) and NW 131st
St. (MP 10.511). Cost $89 Million
2017 2017
98
h.
19. RELEVANT PROJECTS (CONT.)
f.
e.
d.
g.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 GARy CRAiG
NW 38th St from Powerline Rd to Andrews Ave
Oakland Park, Florida
Project FM # 427766-1-58/68-01 Fed # 8886054A
Senior Inspector. Project included above ground improvements, widening, drainage improvements, signing and pavement markings,
milling and resurfacing, installation of landscaping, irrigation, sidewalks and decorative lighting. Cost $659,996.81
2013 2013
Clematis Street improvements; LAP Project FM #427652--58-02
West Palm Beach, Florida
Senior Inspector. The Okeechobee Blvd project included the installation of landscaping and irrigation improvements within the project
area. Cost $373,725.51
2014 2014
99
c.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete One Section E for Each Key Person.)
12. NAME
16. EDUCATION (Degree and Specialization)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
15. FIRM NAME AND LOCATION (City and State)
13. ROLE IN THIS CONTRACT
a. TOTAL b. WITH CURRENT FIRM
14. YEARS OF EXPERIENCE
19. RELEVANT PROJECTS
a.
b.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 JuliO ANTONiO
JULIO ANTONIO
Calvin, Giordano & Associates, inc.
Associate in Construction Management General Contractors license Florida
Certified Home inspector license Florida
Fort Lauderdale, FL
Miami-Dade College, Miami, Florida No. 048458
No. HI4031
TIN#A535421571320
CTQP: Asphalt Paving Level 1 & Level 2; Concrete Field Tech Level 1; Drill Shaft; Earthwork Level 1 & Level 2; Final Estimates Level 1 &
Level 2; Pile Driving; Qualified Grouting Tech; ACI Concrete Field Testing 1; Critical Structures; Intermediate MOT; IMSA Traffic Signal Level 1;
Nuclear Gauge Safety Training; Stormwater, Erosion & Sed
SENIOR INSPECTOR 35 9
North Bay Road Emergency Access Bridge & Seawall Mitigation
Sunny Isles Beach, Florida
Senior Bridge Inspector. Bridge was necessary as an alternate route for emergencies because north-south access is limited to Collins
Avenue, the bridge will be open to pedestrians and will provide an alternate evacuation route during hurricane and tropical storm events.
The bridge measures 263 feet by 39 feet wide with eight (8) feet over-water clearance for navigational access.
2017 2017
Beachwalk ii Phase ii (from 3rd St to 5th St) (lAP Funded)
Miami Beach, Florida
Senior Inspector. This project consisted of the construction of an ongrade ADA compliant pedestrian paver walkway, with bollard lights,
landscaping & irrigation. Other work consisted of exotic dune vegetation removal, replaced with dune enhancements such as native dune
vegetation species & beach compatible dune fill & irrigation for the landscaping. The path lighting also meets Florida Fish and Wildlife
Commission’s marine turtle nesting requirements. Cost$1,629,456.40
2017 2018
Hard Rock Stadium Pedestrian Bridges and Tunnels
Miami Gardens, Florida
Project FM #’s 440858-1-58-01/440858-2-54-01
Senior Inspector. Project consists of the construction of a pedestrian bridge over the Turnpike exit ramp and a pedestrian bridge over
NW 199 Street and two concrete tunnels under Don Shula Drive. Includes; pile foundations,MSE walls, drainage, lighting, signalization,
signage & pavement markings, precast concrete, curb & gutter, ADA sidewalk/ramps, landscaping, sod, irrigation, parking lot resurfacing,
barrier walls & electrical. Completed prior to 2019 Superbowl.
2019 2019
100
h.
19. RELEVANT PROJECTS (CONT.)
f.
e.
d.
g.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 JuliO ANTONiO
Bid Pack 9 infrastructure improvements
Oakland Park, Florida
Senior Inspector. Approx 570 acres, included drainage improvements, water main replacement, sewer forcemain replacement,
rehabilitation of Lift Station B-2, 3 & 4, sidewalk installation, roadway improvements & resurfacing. Drainage improvements included
swales, underdrains, stormwater conveyance system piping networks and exfiltration trenches. Cost $9,640,779.41
2015 2015
Expanded lloyd Estates Residential and industrial improvements
Oakland Park, Florida
Senior Inspector. Project included drainage improvements, watermain replacement, installation of flood gates, stormwater pump station
and a tidal check valve. The proposed drainage improvements include construction of roadside swales, construction of new stormwater
conveyance system, piping networks and exfiltration trenches, modification of the existing conveyance systems & construction of new
outfall structures that discharge into the Sleepy River. Cost $7,832,907.90
2015 2016
101
c.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete One Section E for Each Key Person.)
12. NAME
16. EDUCATION (Degree and Specialization)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
15. FIRM NAME AND LOCATION (City and State)
13. ROLE IN THIS CONTRACT
a. TOTAL b. WITH CURRENT FIRM
14. YEARS OF EXPERIENCE
19. RELEVANT PROJECTS
a.
b.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 VicTOR MuRphy
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firm
VICTOR MURPHY
calvin, Giordano & Associates, inc.
instituto Superior de ciencias Medicas de Villa clara
Fort Lauderdale, FL
Cuba
TIN# M612873670100
CTQP: Asphalt Paving Level 1; Concrete Field Tech Level 1; Earthwork Level 1; Earthwork Level 2; Final Estimates Level 1
Other: ACI Level 1 (Concrete Field); FDOT ITS Managed Field Ethernet Switch Training; FDOT ITS Road Weather Information System Training;
FDOT ITS Microwave Vehicle Detection System Training; FDOT ITS Closed-Caption Television Training; FDOT ITS Dynamic Message Signs
Training; Hazmat; Nuclear Gauge Safety Training; Intermediate MOT; MSE Wall & Auger Cast Piles; Security Awareness Course; Stormwater,
Erosion and Sedimentation Control
INSPECTOR 4 1
MDX; D/B SR-836 Operation, capacity and interchange improvements
Florida
Proj No. 83628.050 (Cost $149 M): Proj elements include: the addition of EB/WB lanes to SR-836 from W of 57th Ave to E of 17th Ave,
implementation of C-D Rds to the major interchanges at 57th Ave, 42nd Ave (LeJeune Rd), 37th Ave (Douglas Rd), 27th Ave, & 17th
Ave, & replacement of the ITS Backbone, as well as the ORT facilities in the system. Improved the level of service & safety features,
provided additional capacity on the SR-836 mainline & operational movements in & around the existing interchanges. Responsible for
performing MOT verification checks, measurements, calculating quantities, material sampling, performing densities, erosion control
checks, checking cross slope depth & width, & assisting Sr Insp. while testing for concrete, roadway drainage, highway lighting, fencing,
& guardrails, as well as maintaining accurate Proj records. Responsible for inspections of electronic tolling, DMS, installation of fiber
optic trunk for the project, installation of CCTV poles with cabinets, installation of lighting, signalization, pull boxes, & power service.
2017-2019 2019
i-95 Express; phase 3A; project FM # 433108-4-52-01
Florida
Inspector. This phase will extend the existing express lanes north from just south of Broward Boulevard to just north of Commercial
Boulevard in Broward County. One lane will be added and the High Occupancy Vehicle (HOV) lane will be converted to create two express
lanes in each direction. This project includes ramp signalization from Hallandale Beach Boulevard to Commercial Boulevard. Other work
includes: installing Intelligent Transportation System (ITS) and tolling equipment; widening bridges; and installing noise barrier walls at
locations along I95 Southbound between Broward Boulevard and NW 6th Street, and along I-95 Northbound between Powerline Road
and Commercial Boulevard. Victor was responsible for densities for MSE walls, embankment, ITS improvements inspections, subgrade,
base; concrete testing, barrier wall, MSE wall placement, drainage, MOT reviews. Cost: $149 Million
2020 2020
Florida’s Turnpike Enterprise, South Florida DMS improvement and Replacement
Florida
Project FM # 435605-7-52-01: Inspector. Project consists of the construction of new ADMS structures and demolition of existing units
along the approach streets to Sawgrass Expressway, Homestead exits at 288 Street and 137 Avenue, and Lake Worth Road. New CCTV
poles will be installed with ITS cabinets with transfer switch and generator pads. The project also consists of fiber installation using open
trench and directional bore, splicing new power services, and replacement of Large walk-in DMS units over the Turnpike mainline.
2020-Ongoing
102
h.
19. RELEVANT PROJECTS (CONT.)
f.
e.
d.
g.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 VicTOR MuRphy
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firm
MD pS h-irma post-Event Natural Disaster Monitoring
Florida
Inspector. Debris Tower Monitor Member of the emergency repairs team after natural disaster-related emergency. Supervised several
teams in-charge of debris removal, protected remaining facilities, restored essential traffic, including proper Maintenance of Traffic
(MOT), from Federal Aid Highway segments, state, local, and private roadways within the Florida Department of Transportation (FDOT).
2017 - 2018
103
c.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete One Section E for Each Key Person.)
12. NAME
16. EDUCATION (Degree and Specialization)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
15. FIRM NAME AND LOCATION (City and State)
13. ROLE IN THIS CONTRACT
a. TOTAL b. WITH CURRENT FIRM
14. YEARS OF EXPERIENCE
19. RELEVANT PROJECTS
a.
b.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 RezA ShAMS
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firm
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firm
REZA SHAMS
Calvin, Giordano & Associates, Inc.
Bachelor of Science in Civil engineering
Fort Lauderdale, FL
University of Miami, Miami, Florida
TIN#S520001524640
CTQP: Asphalt Level 1 & Level 2; Concrete Field Tech Level 1 & Level 2; Drilled Shaft; Earthwork Level 1 & Level 2; Final Estimates Level 1 &
Level 2; QC Manager; Advanced MOT; ACI Level 1 & Level 2; Critical Structures; IMSA Traffic Signal Inspector Level 1; Nuclear Gauge Safety
Training; Stormwater, Erosion and Sedimentation Control
ASSISTANT PA/CSS 36 1+
SFWMD; Section C Water Farm Berm Construction for C-23
Florida
CSS. The section C water farm berm construction project consisted of the construction of a small impoundment for C-23 canal that
located St. Lucie County. The farm was constructed over approximately one square mile of land and included; clearing & grubbing
and construction of embankment, canal vehicle access ramps, vehicle turnouts maintenance berm, seepage canal, culvert, exfiltration
trench, water control structure & pipes, stilling basin, armoring, & sod.
2016 2016
Port of Miami Terminal A Berth-7
Miami, Florida
This project consisted of construction of a Bulkhead concrete cap (Seawall), including massive foundation of pipe pile, sheet pile
(Combi-wall) supported with tie rods, grout soil anchors, water station, bollards and drill shafts. Also included construction of PBB
(Passenger Boarding Bridge) with augercast piles as foundation and construction of apron, retaining walls, drainage system, water
supply with lighting system and asphalt.
2017 2018
Collins Avenue (SR A1A) Decorative Lighting (from Bayview Dr to 192nd St)
Sunny Isles Beach, Florida
Project includes the removal of existing conventional lighting poles, installation of new pole foundations or rehabilitation of existing pole
foundations, installation of new decorative poles, installation of electrical conduits and wires and MOT supervision. Cost: $4,830,000.00
2018 2019
104
h.
19. RELEVANT PROJECTS (CONT.)
f.
e.
d.
g.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 RezA ShAMS
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firm
Car Rental and CS east Concourse Miami Intermodal Center
Oakland Park, Florida
Project FM # 249937-5-52-01 & 406800-2-52-03
CSS. This project spanned 10 years and consisted of 3 million sq ft of floor space with a terminal quality customer service lobby, multi-
floor refueling system, associated ramp structures tying into a rental car center including a CC2 bridge with curved steel superstructure
on driven piles, MSE walls, rigid pavement for bus station parking areas, lighting & signalization. Cost $600 Million
2006 2006
Miami-Dade Transit (MDT); earlington heights Connector Miami Intermodal Center
Miami-Dade, Florida
Structural Inspector. This gateway project included 2.5 miles of elevated bridges that combined segmental and U-Beams with all transit
system facilities. Cost $500 Million
2009 2009
105
General Planning
Redevelopment Srvcs
Arch Visualizations & 3D
Water / Wastewater Eng
Electrical Engineering
Environmental Srvcs
Website Development
GIS Mapping & Analysis
Surveying and Mapping
Urban Design Traffic Engineering Constr Admin / CEI
Landscape Architecture Civil Engineering Public Outreach
20. EXAMPLE PROJECT
KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
22. YEAR COMPLETED
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
a.
b.
c.
d.
e.
STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS
In-house CGA services provided for this project:
2011 2018
01
CITY OF SUNNY ISLeS BeACH
Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and
all in-house services identified above.
North Bay Road Pedestrian Bridge
elka Linton-Dorsett 305.792.1939
Sunny Isles Beach, FL
CIP Program Manager edorsett@sibfl.net
APPROXIMATE PROJECT SIZE:
PROFESSIONAL FEES:
CONSTRUCTION COST:
0.7 Acres
$ 1,050,000
$ 7,800,000
CGA was retained by the City of Sunny Isles Beach to survey, design, permit, and
administer the construction of the North Bay Road Bridge, spanning a canal between
174th St. and 172nd St. along North Bay Road. The principal function of the bridge
is to provide pedestrian access across the canal, as well as it is designed to provide
access to emergency vehicles as a bypass to Collins Ave. during periods of heavy
traffic congestion.
The CGA team approached the project first as a ‘place’ and a pedestrian amenity,
and second as an emergency access last. The design was centered on creating
a park-like setting with planting and seating that would appeal to pedestrian use
and would promote lingering. A strong branding strategy was embedded within the
hardscape design that reinforced the concept of using infrastructure as a recreational
asset and in turn has established it as a landmark within the City. The project
included several work efforts adjacent to the bridge, including the construction of
an observation deck in Town Center Park, located at the eastern end of the canal,
and a boardwalk connecting the deck to the North Bay Road bridge. Associated
drainage, roadway, utility, and hardscape improvements were made along 174th
St. and 172nd St. to account for the increased drainage and other impacts to the
surrounding infrastructure.
The project involved intensive coordination with regulatory agencies, utilities,
government entities, and local stakeholders. The CGA team was able to procure all
necessary permits to conduct the work on schedule.
X X
X X
106
General Planning
Redevelopment Srvcs
Arch Visualizations & 3D
Water / Wastewater Eng
Electrical Engineering
Environmental Srvcs
Website Development
GIS Mapping & Analysis
Surveying and Mapping
Urban Design Traffic Engineering Constr Admin / CEI
Landscape Architecture Civil Engineering Public Outreach
20. EXAMPLE PROJECT
KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
22. YEAR COMPLETED
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
a.
b.
c.
d.
e.
STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS
In-house CGA services provided for this project:
2012-2014 2019
02
CITY OF MIAMI BeACH
Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and
all in-house services identified above.
Middle Beach Recreational Corridor - Phase II
Ariel Guitian 305.673.6071 ext. 6732
Miami Beach, FL
Senior Project Coordinator, Office of Capital Improvements ArielGuitian@miamibeachfl.gov
APPROXIMATE PROJECT SIZE:
PROFESSIONAL FEES:
CONSTRUCTION COST:
2 Miles
$ 534,000
$ 13,000,000
Calvin, Giordano & Associates, Inc. designed and permitted an on-grade, ADA-
accessible pathway that supports the use of pedestrians and cyclists. The project is
a part of the greater Atlantic Greenway Network, and comprises a critical component
of the bicycle facilities throughout the City of Miami Beach. It connects Indian Beach
Park on the south to the North Beach Recreational Trail at Allison Park with a 2-mile
paver walkway, continuing the City’s unique branding qualities.
The path was permitted in accordance with the Florida Dept. of Environmental
Protection’s and the Florida Fish and Wildlife Conservation Commission’s regulations,
as the entirety of the project lies within State-owned lands. The scope of work
included extensive public outreach, branding and site design, coastal engineering,
dune planting plans, lighting design, and bidding and construction administration.
The project connects business districts, cultural/tourism centers, parks, residential
neighborhoods and the beaches, and it completed a major portion of the essential
north-south connector of the AGN to facilitate pedestrian and non-motorized
transportation throughout the City.
X X
X X
X
X
107
General Planning
Redevelopment Srvcs
Arch Visualizations & 3D
Water / Wastewater Eng
Electrical Engineering
Environmental Srvcs
Website Development
GIS Mapping & Analysis
Surveying and Mapping
Urban Design Traffic Engineering Constr Admin / CEI
Landscape Architecture Civil Engineering Public Outreach
20. EXAMPLE PROJECT
KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
22. YEAR COMPLETED
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
a.
b.
c.
d.
e.
STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS
In-house CGA services provided for this project:
2009 - Ongoing N/A
03
CITY OF HALLANDALe BeACH
Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and
all in-house services identified above.
Hallandale Beach Ne Quad and SW Drainage Improvements
Manga ebbe 954.597.3700
Hallandale Beach, FL
Project Manager mebbe@hallandalebeachfl.gov
APPROXIMATE PROJECT SIZE:
PROFESSIONAL FEES:
CONSTRUCTION COST:
170 Acres (NE) | 330 Acres (SW)
$ 470,000.00 (NE) | $782,395.00 (SW)
$ 8.3 M (NE) | $9.3 M (SW)
The two Hallandale Beach Drainage Improvement Projects’ main goals were to
defend the neighborhood from sea level rise and most importantly, reduce their
dependence on discharge to a tidally controlled water body.
The NE neighborhood project included the installation of two (2) large pump stations
pumping stormwater into 15 drainage injection wells within the neighborhood.
In-line check valves were installed just before the system’s two outfalls allowing
discharge via gravity during low tide but stopping water from back-flowing into the
neighborhood’s system during high tide. The pump station and drainage wells were
designed to handle a 100 year storm event without reliance on the existing tidally
controlled gravity outfall.
The SW neighborhood project installed a large pump station and 22 drainage
injection wells. A large control structure with four (4) flapgates and 1 mechanically
controlled slide gate was constructed to isolate the system from the downstream
tidal waters, when necessary. The mechanical gate closes prior to stormwater
pump station operation while the four (4) flapgates continue to allow for gravity
discharge during low tides so the system maximizes the ability to flow via gravity,
when possible, while also being self-reliant with the drainage wells. A large generator
was constructed for the pump station to allow for continuous operation even during
power outages. The permanent generator, which is set above FEMA flood elevations,
was wrapped with a nature design to help blend with the neighborhood. The pump
station and control structures were finished with native plantings to blend with the
surrounding neighborhood.
X X
X
X
X
X
108
General Planning
Redevelopment Srvcs
Arch Visualizations & 3D
Water / Wastewater Eng
Electrical Engineering
Environmental Srvcs
Website Development
GIS Mapping & Analysis
Surveying and Mapping
Urban Design Traffic Engineering Constr Admin / CEI
Landscape Architecture Civil Engineering Public Outreach
20. EXAMPLE PROJECT
KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
22. YEAR COMPLETED
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
a.
b.
c.
d.
e.
STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS
In-house CGA services provided for this project:
2014 2014
04
MIAMI-DADe COUNTY
Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and
all in-house services identified above.
Rickenbacker Causeway Bridge Rehabilitation
Kathleen Woods-Richardson 305.372.6789
Miami-Dade County, FL
Director Email: N/A
APPROXIMATE PROJECT SIZE:
PROFESSIONAL FEES:
CONSTRUCTION COST:
N/A Acres
$ N/A
$ N/A
CGA was subcontracted by Hardesty and Hanover, the engineering firm on the
design build team with Kiewit Construction. CGA’s scope included hydrographic
and topographic survey, drainage design, lighting and signing and pavement
markings for the rehabilitation of the Rickenbacker Causeway’s West Bridge and
the rehabilitation and expansion of the Bear Cut Bridge. The Bear Cut bridge was
widened to accommodate a multi-use path in both directions, separated from the
travel lanes by a barrier wall; and 8’ bike lanes adjacent to traffic in both directions.
Also included were both approaches to Bear Cut Bridge which required coordination
with two of the County’s adjacent future projects. The Rickenbacker Causeway is
highly utilized by cyclists, both road bikes and cruisers. As such, Miami Dade Traffic
was very focused on accommodating all users and getting stakeholder feedback as
part of the project.
Numerous meetings and coordination efforts made permitting the signing and
pavement markings for this project possible. As part of the rehabilitation of the
Bear Cut bridge, the existing cross slope and bridge deck structure were modified
impacting the existing drainage through Miami Dade County’s Regulatory &
Economic Resources Department and South Florida Water Management District
was accomplished through innovative design and extensive agency coordination
since the receiving waters, Biscayne Bay, are Outstanding Florida Waters. Electrical
coordination for the demolition and rehabilitation of the bridge deck were critical
to maintaining safe travel ways during construction. CGA coordinated the bridge
circuits during construction as well as providing new lighting for the widened bridge
and new multi-use paths.
X
X
109
General Planning
Redevelopment Srvcs
Arch Visualizations & 3D
Water / Wastewater Eng
Electrical Engineering
Environmental Srvcs
Website Development
GIS Mapping & Analysis
Surveying and Mapping
Urban Design Traffic Engineering Constr Admin / CEI
Landscape Architecture Civil Engineering Public Outreach
20. EXAMPLE PROJECT
KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
22. YEAR COMPLETED
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
a.
b.
c.
d.
e.
STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS
In-house CGA services provided for this project:
2015 - 2017 2017
05
FDeP
Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and
all in-house services identified above.
Dr. Von D. Mizell-eula johnson State Park
Mrs. Theresa Carron 850.245.2721
Fort Lauderdale, FL
Project Manager Theresa.Carron@dep.state.fl.us
APPROXIMATE PROJECT SIZE:
PROFESSIONAL FEES:
CONSTRUCTION COST:
N/A Acres
$ 45,919.64
$ 406,529.06
Formerly known as John U. Lloyd Beach State Park - Beach Access Boardwalk and
Ramp Repairs
CGA was contracted by the Florida Department of Environmental Protection (FDEP)
to replace the existing boardwalk deck to meet current ADA requirements. The project
scope included surveying, civil, permitting, preparation of construction documents
and technical specifications, and assistance to FDEP during the bid processes.
Project improvements included the re-decking of the boardwalks at four (4)
separate beach access locations which provide pedestrian access from the existing
parking facilities to the beach. The improvements have been designed to meet the
Americans with Disabilities (ADA) Act and the Florida Accessibility Code of 2012.
Environmental considerations were considered during the design process and the
protection of all existing vegetation was a critical component for FDEP in this project.
These enhancements were designed and permitted simultaneously, and were
completed with the continued coordination through both client and permit agencies.
Due to the proximity of the existing beach shore line, an FDEP Coastal Construction
Control Line (CCCL) Field Permit was obtained to ensure proper design and site
construction to minimize impacts to the adjacent sensitive coastal vegetation.
Because design of boardwalks limited ground disturbance of surrounding seaward
lands, a South Florida Water Management District (SFWMD) Deminimus Exemption
was obtained for water resources. Construction was completed in 2017.
X X
X X
110
General Planning
Redevelopment Srvcs
Arch Visualizations & 3D
Water / Wastewater Eng
Electrical Engineering
Environmental Srvcs
Website Development
GIS Mapping & Analysis
Surveying and Mapping
Urban Design Traffic Engineering Constr Admin / CEI
Landscape Architecture Civil Engineering Public Outreach
20. EXAMPLE PROJECT
KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
22. YEAR COMPLETED
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
a.
b.
c.
d.
e.
STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS
In-house CGA services provided for this project:
2015 - 2019 2019
06
CITY OF OAKLAND PARK
Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and
all in-house services identified above.
Andrews Avenue Roadway Improvements
Lori Douvris 954.630.4200
Oakland Park, FL
Project Manager Lori.Douvris@oaklandparkfl.gov
APPROXIMATE PROJECT SIZE:
PROFESSIONAL FEES:
CONSTRUCTION COST:
N/A Acres
$ 227,310.00
$ 2,000,000.00
The improvements to Andrews Avenue from Prospect Road south to Oakland Park
Boulevard was funded by a Transportation Enhancement grant through the FDOT
District 4, which required it to follow FDOT LAP submittal requirements. The scope
of this project includes construction of a landscaped median, reconstruction of
existing sidewalks to meet current ADA standards, adding bicycle lanes, and a mid-
block crossing for pedestrians, turn lane analysis, milling and resurfacing, signing
and pavement markings, pedestrian lighting and conventional roadway lighting
modifications. Permitting is required through Broward County Environmental
Protection and Growth Management Division (BCEPGMD), Broward County
Highway Construction and Engineering Division (BCHCED), Broward County Traffic
Engineering Division (BCTED), and the City of Oakland Park.
X X
X X
X
X X
111
General Planning
Redevelopment Srvcs
Arch Visualizations & 3D
Water / Wastewater Eng
Electrical Engineering
Environmental Srvcs
Website Development
GIS Mapping & Analysis
Surveying and Mapping
Urban Design Traffic Engineering Constr Admin / CEI
Landscape Architecture Civil Engineering Public Outreach
20. EXAMPLE PROJECT
KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
22. YEAR COMPLETED
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
a.
b.
c.
d.
e.
STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS
In-house CGA services provided for this project:
2013 - 2017 2017
07
DANIA eNTeRTAINMeNT CeNTeR, LLC
Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and
all in-house services identified above.
Dania jai-Alai Onsite & Offsite Improvements
joaquin Gerlero 954.600.8397
Dania Beach, FL
CEO & Founder F3 Architecture
APPROXIMATE PROJECT SIZE:
PROFESSIONAL FEES:
CONSTRUCTION COST:
N/A Acres
$ 766,000.00
$ 3,000,000.00
CGA provided site development services for the onsite and offsite improvements
required to upgrade the existing Jai-alai facility to accommodate a casino. Design,
permitting, construction oversight, and closeout for new offsite water mains, onsite
service connections for water and sewer, site circulation, coordination of utilities,
drainage connections, two new entrances to the property, a revamped valet drop-off
area as well as offsite roadway improvements to the adjacent city owned Fronton
Boulevard were part of the project. The improvements on Fronton Boulevard required
the design of a completely new storm water collection system to accommodate the
roadway widening as the existing system was either undersized or in bad condition.
New street lighting, irrigation and landscaped medians were installed to complete
the corridor’s upgrade.
The demand of the upgraded facility and requirements of the developer’s agreement
with the City required 1,570 LF of 8” and 1,270 LF of 12” water main upgrades to the
City’s transmission mains, new fire hydrants both onsite and offsite, and multiple new
service and irrigation connections for the project site. City, Health Department and
FDOT permitting and certifications were required for the new water main installation
and operation. The new 8” sanitary sewer lines required close coordination with the
proposed water main, existing and proposed storm drain laterals, the fire lines, MEP
connections and underground electrical, gas, and communications for the building.
CGA provided surveying, planning, civil and electrical engineering, landscape
architecture and construction oversight for the improvements required to upgrade
the existing Jai-alai facility to accommodate a casino.
X X
X
X
X
112
General Planning
Redevelopment Srvcs
Arch Visualizations & 3D
Water / Wastewater Eng
Electrical Engineering
Environmental Srvcs
Website Development
GIS Mapping & Analysis
Surveying and Mapping
Urban Design Traffic Engineering Constr Admin / CEI
Landscape Architecture Civil Engineering Public Outreach
20. EXAMPLE PROJECT
KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
22. YEAR COMPLETED
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
a.
b.
c.
d.
e.
STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS
In-house CGA services provided for this project:
2015 - 2018 2018
08
CITY OF COCONUT CReeK
Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and
all in-house services identified above.
Windmill Park expansion and Renovation
Brian Rosen 954.545.6614
Coconut Creek, FL
Project Manager BRosen@coconutcreek.net
APPROXIMATE PROJECT SIZE:
PROFESSIONAL FEES:
CONSTRUCTION COST:
N/A Acres
$ 108,260.00
$ 2,400,000.00
Calvin, Giordano & Associates, Inc. (CGA), was selected as part of the design team
under Synalovski, Romanik, Saye Architects (SRS) to enhance Windmill Park for the
City of Coconut Creek. Enhancements included new concrete sidewalks with exercise
stations throughout the site, restroom building, expanding the existing parking areas
with two new parking lots, reconstruction and repositioning of the tennis courts, a
small and large dark park which included dog wash stations and agility equipment,
a new ADA-approved play apparatus, and site furnishings throughout the site. SRS
provided Architectural services for the new Restroom Building, and site layout. CGA
provided civil, landscape and construction services to provide landscape, grading,
and drainage including exfiltration trench and retention areas, water and sewer
improvements to the site. Pavement markings, utility coordination and permitting
was also included in the civil scope.
Professional Landscape services included tree inventory for the project, tree removal/
relocation permit to meet City requirements, and the proposed planting plan including
city requested berms for privacy and enhanced planting and irrigation. Construction
Observation and Administration Services included periodic construction field
representative observation services for the construction of site utilities, parking lot
and associated drainage system improvements, sidewalks and final site grading.
Permitting was required through City of Coconut Creek and Broward County Surface
Water Management.
The project was completed in September 2018.
X X
X
113
General Planning
Redevelopment Srvcs
Arch Visualizations & 3D
Water / Wastewater Eng
Electrical Engineering
Environmental Srvcs
Website Development
GIS Mapping & Analysis
Surveying and Mapping
Urban Design Traffic Engineering Constr Admin / CEI
Landscape Architecture Civil Engineering Public Outreach
20. EXAMPLE PROJECT
KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
22. YEAR COMPLETED
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
a.
b.
c.
d.
e.
STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS
In-house CGA services provided for this project:
2012 - 2014 2014
09
CITY OF MIAMI GARDeNS
Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and
all in-house services identified above.
Rolling Oaks Park - Pedestrian Trail Project
jimmie Allen 305.622.8000 ext 2802
Miami Gardens, FL
Senior Project Manager - Capital Improvements JAllen@miamigardens-fl.gov
APPROXIMATE PROJECT SIZE:
PROFESSIONAL FEES:
CONSTRUCTION COST:
N/A Acres
$ 140,000.00
$ 670,000.00
Calvin, Giordano & Associates, Inc. was contracted by the City of Miami Gardens
to design a pedestrian trail within Rolling Oaks Park and to provide a safe route
through the surrounding neighborhood to connect the new trail in the park to an
existing walking trail in the Dolphin Center Park located three quarters of mile away.
The design for the trail included new outdoor fitness stations, seating areas, and
LED site lighting. A study was conducted by CGA to determine the best route for
the walkway through the neighborhood and what improvements would be needed.
New crosswalks are being added along with a solar powered, on-demand pedestrian
crossing signal where the trail leaves the park. A custom-designed way-finding
signage program was developed for all of the trailhead signs, directional signs, and
mile markers and funded by LAP funds. This afforded the City of Miami Gardens a
unique opportunity for branding within the community. Besides determining the best
route through the neighborhood, the CGA team had to carefully plan the route for
the trail through the park so as to not disturb the hundreds of existing Live Oak trees
on the site. Using GPS technology, the CGA team worked out the best route for the
trail in the field, and then returned to the office to translate those points into the final
alignment for the pathway. In addition, the existing drainage permit for the site had
to be modified for the trail improvements. These new drainage facilities also had to
be carefully planned to avoid removing any trees. CGA also provided construction
administration services for the project, which was completed in November 2014.
X X
X X
X
114
General Planning
Redevelopment Srvcs
Arch Visualizations & 3D
Water / Wastewater Eng
Electrical Engineering
Environmental Srvcs
Website Development
GIS Mapping & Analysis
Surveying and Mapping
Urban Design Traffic Engineering Constr Admin / CEI
Landscape Architecture Civil Engineering Public Outreach
20. EXAMPLE PROJECT
KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
22. YEAR COMPLETED
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
a.
b.
c.
d.
e.
STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS
In-house CGA services provided for this project:
2011 N/A
10
CITY OF DANIA BeACH
Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and
all in-house services identified above.
Dania Cove Park
Mark T. Felicetty 954.924.6800 ext. 3730
Dania Beach, FL
Director, P&R Department mfelicetty@ci.dania-beach.fl.us
APPROXIMATE PROJECT SIZE:
PROFESSIONAL FEES:
CONSTRUCTION COST:
N/A Acres
$ 103,000
$ 537,000
CGA developed a waterfront park design on an archeologically significant site
in the City of Dania Beach; the site, which contains a scenic mangrove cove, is
located along the Dania Cut-off canal. The park design features waterfront elements,
including a fishing dock and platform, picnic pavilions and an exercise path for the
park users. Native plantings were used to eliminate the park’s need for permanent
irrigation, and plants were selected for their educational opportunities including
highlighting the butterfly attracting varieties. The project scope included designing
the site amenities to preserve and highlight the remnant Oak Hammock; designing
a stabilization system for the shoreline embankment along with vegetating the
shoreline (before and after pictures shown above); designing informational kiosks
featuring the historic Native American midden and the site’s natural resources; and
obtaining all required permits for the installation of the site features. A State and a
County Grant were provided to assist in the project costs. The scope also included
coordinating with the County and State on gaining approval for the site design,
tracking all expenditures and processing and obtaining all grant funds for the City,
and closing out the grants and permits. As a part of the park’s design for the Dania
Cove Park, CGA created a series of informational panels and environmental graphics
to be installed on-site. The purpose of the graphics was to provide an educational
component to the park to teach park users about the archeological significance of
the site. An opportunity was found to also include historical panels to celebrate the
history of the City of Dania Beach, as well as to highlight design features of the park
design – such as the butterfly attractor plants.
X X
X
X X
115
General Planning
Redevelopment Srvcs
Arch Visualizations & 3D
Water / Wastewater Eng
Electrical Engineering
Environmental Srvcs
Website Development
GIS Mapping & Analysis
Surveying and Mapping
Urban Design Traffic Engineering Constr Admin / CEI
Landscape Architecture Civil Engineering Public Outreach
20. EXAMPLE PROJECT
KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
22. YEAR COMPLETED
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
a.
b.
c.
d.
e.
STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS
In-house CGA services provided for this project:
Landscape Architecture
2014 N/A
11
MIAMI-DADe PARKS
Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and
all in-house services identified above.
Oak Grove Park Improvements
Fernando Marquez, RA, LeeD AP 305.755.7847
North Miami, FL
Architecture Section Head - Capital Programs Division Email
APPROXIMATE PROJECT SIZE:
PROFESSIONAL FEES:
CONSTRUCTION COST:
N/A Acres
$ 35,000.00
$ 1,200,000.00
Oak Grove Park located at 690 NE 159th Street in North Miami, is one of the most
highly utilized parks in the area and is known for its majestic Oak Tree canopy. CGA
provided professional services to develop two new tennis courts, expand the fitness
trails and add pedestrian lighting. In order to locate the new courts several existing
large Oak trees and Gumbo Limbo trees had to be relocated. The success of these
relocations has been recognized throughout the Miami Dade Parks, Recreation and
Open Spaces as a pioneering effort. CGA provided the paving, grading and drainage
for the new tennis courts and new fitness path throughout the park as well as the
drainage modifications to accommodate the improvements while working around
existing trees, where feasible. A new water service for a drinking fountain and a
hose bid for the new tennis courts was provided. CGA also prepared specifications,
construction oversight and permitting for this specialized park project.
X X
X
X
X X
116
General Planning
Redevelopment Srvcs
Arch Visualizations & 3D
Water / Wastewater Eng
Electrical Engineering
Environmental Srvcs
Website Development
GIS Mapping & Analysis
Surveying and Mapping
Urban Design Traffic Engineering Constr Admin / CEI
Landscape Architecture Civil Engineering Public Outreach
20. EXAMPLE PROJECT
KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
22. YEAR COMPLETED
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
a.
b.
c.
d.
e.
STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS
In-house CGA services provided for this project:
2015 2017
12
CITY OF DeLRAY BeACH CRA
Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and
all in-house services identified above.
Fire Station Commemorative Plaza
jeff Costello 561.276.8640
Delray, FL
Asst. CRA Director costelloj@ci.delray-beach.fl.us
APPROXIMATE PROJECT SIZE:
PROFESSIONAL FEES:
CONSTRUCTION COST:
0.25 Acres
$ 7,000
$ 800,000
The Delray Beach CRA’s 2002 Downtown Master Plan identified NW/SW 5th Avenue
as the mid-point along Atlantic Avenue, between Interstate I-95 and the downtown
core. The plan recommended the creation of twin public plazas on the northwest
and southwest corners of the intersection to serve as a new neighborhood center
and gathering place for the community as a whole.
CGA designed the plaza on the Northwest corner which consists of landscape
features and pedestrian amenities. The design also included colorful terrazzo and
keystone pavers similar to the Libby Wesley Plaza (SW corner) of intersection, and
includes four bronze emblems featuring fire rescue motifs. Green building elements
such as permeable pavers and native vegetation were also incorporated into the
project. The design allows for seamless integration into the Atlantic Avenue corridor
while still honoring the unique civic identity of the Fire Rescue Headquarters.
X X
X
X
X
117
General Planning
Redevelopment Srvcs
Arch Visualizations & 3D
Water / Wastewater Eng
Electrical Engineering
Environmental Srvcs
Website Development
GIS Mapping & Analysis
Surveying and Mapping
Urban Design Traffic Engineering Constr Admin / CEI
Landscape Architecture Civil Engineering Public Outreach
20. EXAMPLE PROJECT
KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
22. YEAR COMPLETED
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
a.
b.
c.
d.
e.
STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS
In-house CGA services provided for this project:
2020 2020
13
FORT LAUDeRDALe DOWNTOWN
DeVeLOPMeNT AUTHORITY (DDA)
Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and
all in-house services identified above.
SW 2nd Avenue
elizabeth Van Zandt 954.123.4567
Fort Lauderdale, FL
Executive Vice-President Elizabeth@ddaftl.org
APPROXIMATE PROJECT SIZE:
PROFESSIONAL FEES:
CONSTRUCTION COST:
0.5 Acres
$ 81,195
$ 750,000
Our approach to this project was one inherently about urban design and space-
creation. It was not simply a matter of beautification, but rather a process of
embedding the environment with value to take advantage of inherent, flexible
opportunities. We believe that these, in turn, will animate socialization, celebrate the
culture of place, and provide for a multi-functional framework. We seek to capture
the human experience, including mood, atmosphere, color, sound, tactility, pleasure
and light that characterizes the ethos of ‘place’ that lives at this intersection of:
• Culture – with the Broward Center for the Performing Arts, Museum of Discovery
and Science, and the Esplanade Park,
• Socialization – with the vibrant Himmarshee Street nightlife scene,
• History – with the campus of historical buildings, including the Museum of
History, Hoch Heritage Center, Philemon Bryan House, King-Cromartie House,
and the Schoolhouse), and
• Access and Connectivity – with the continuity of the Riverwalk as a major
destination linking the various waterfront properties.
Our goal for this project was to provide a design solution that results in products
that are resilient, innovative, creative, sensitive, inspiring, memorable, responsible,
interpretive, comprehensive, imaginative and visionary. We lead by design and with
design.
X X
X
XX
X
118
General Planning
Redevelopment Srvcs
Arch Visualizations & 3D
Water / Wastewater Eng
Electrical Engineering
Environmental Srvcs
Website Development
GIS Mapping & Analysis
Surveying and Mapping
Urban Design Traffic Engineering Constr Admin / CEI
Landscape Architecture Civil Engineering Public Outreach
20. EXAMPLE PROJECT
KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
22. YEAR COMPLETED
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
a.
b.
c.
d.
e.
STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS
In-house CGA services provided for this project:
2014 2018
14
CITY OF FORT LAUDeRDALe
Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and
all in-house services identified above.
Mills Pond Park
enrique Sanchez 954.123.4567
Fort Lauderdale, FL
Assistant Parks & Recreation Director ESanchez@forlauderdale.gov
APPROXIMATE PROJECT SIZE:
PROFESSIONAL FEES:
CONSTRUCTION COST:
7 Acres
$ 461,560
$ 3,700,000
Calvin, Giordano & Associates, Inc. was selected by the City of Fort Lauderdale to
provide planning, design, and construction services for the addition of three new
soccer and lacrosse fields at Mills Pond Park. The existing park located at 2201 N.W.
9th Avenue (Powerline Road) has three lighted soccer fields, one un-lighted soccer
field, and five lighted softball fields. The improvements to the park include three new
fields and all associated sports lighting, drainage, and irrigation, as well as a future
restroom/concession building, new parking, walkways, and landscaping. Originally,
the city staff and the park’s stakeholders had indicated their desire to have at least
2 of the 3 fields be synthetic turf, and to use organic in-fill material instead of black
rubber in-fill material for them.
Working with the City and stakeholders, CGA prepared six (6) configuration options
for bidding purposes per the City’s desire to see what layout would fit within their
construction budget. The City ended up choosing the option with three (3) artificial
turf fields and a future restroom. In addition, the City of Fort Lauderdale wanted to
continue their emphasis on Sustainability by incorporating Green Design principles
such as LED sports lighting, innovative drainage solutions, permeable pavers, and
Florida Friendly Landscaping. One of the main reasons that CGA was selected for
this project is its excellent team of sub-consultants.
The team consisted of Sports Turf One for sports field expertise, Lakdas/Yohalem
Engineering for structural engineering, and Nutting Engineering of Florida for
geotechnical. Construction of the project began in January 2017 and completed in
February 2018.
X X
X
X
X
119
General Planning
Redevelopment Srvcs
Arch Visualizations & 3D
Water / Wastewater Eng
Electrical Engineering
Environmental Srvcs
Website Development
GIS Mapping & Analysis
Surveying and Mapping
Urban Design Traffic Engineering Constr Admin / CEI
Landscape Architecture Civil Engineering Public Outreach
20. EXAMPLE PROJECT
KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
22. YEAR COMPLETED
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
a.
b.
c.
d.
e.
STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS
In-house CGA services provided for this project:
2016-Ongoing N/A
15
VILLAGe OF KeY BISCAYNe
Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and
all in-house services identified above.
530 Crandon Boulevard - Civic Center Park
Todd Hofferberth 305.365.8900 ext.1213
Key Biscayne, FL
Director, Parks and Recreation thofferberth@keybiscayne.fl.gov
APPROXIMATE PROJECT SIZE:
PROFESSIONAL FEES:
CONSTRUCTION COST:
0.5 Acres
$ 110,334
$ 2,100,000 (Estimated)
CGA was approached by the Village of Key Biscayne to reimagine a lot outside
of the Community Center that would inherently create a staple to the village. The
CGA design team approached the project as a timeless design that would relate
to its surrounding functions of government, recreation and open space and would
communicate a continued, upscaled quality. The park’s main component includes a
flexible open lawn area that becomes a ‘civic’ green space used for its versatility. The
lawn area, outside of its passive day-to-day activity, can become a dynamic space
that transforms into event space to hold concerts, food trucks, community fitness
activities, and markets to support programming in the Community Center and serve
as an economic driver to the area.
Other park components include an artwork plaza, a custom pergola design that
enhances the branding of the area, sculptural boulder elements, passive congregation
areas, and a pump track. The project also included lush landscape improvements,
site drainage, and site lighting.
X X
X
X
X
120
General Planning
Redevelopment Srvcs
Arch Visualizations & 3D
Water / Wastewater Eng
Electrical Engineering
Environmental Srvcs
Website Development
GIS Mapping & Analysis
Surveying and Mapping
Urban Design Traffic Engineering Constr Admin / CEI
Landscape Architecture Civil Engineering Public Outreach
20. EXAMPLE PROJECT
KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
22. YEAR COMPLETED
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
a.
b.
c.
d.
e.
STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS
In-house CGA services provided for this project:
2018 2020
16
TOWN OF DAVIe
Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and
all in-house services identified above.
Nova Drive Improvements
jonathan Vogt, Pe 954.797.1082
Davie, FL
Town Engineer jonathan_vogt@davie-fl.gov
APPROXIMATE PROJECT SIZE:
PROFESSIONAL FEES:
CONSTRUCTION COST:
N/A Acres
$ 459,475.00
$ 6,300,000.00
CGA recently completed the design, permitting (SFWMD, CBWCD, THISCD, BC-
HCED), and bidding services (2018) for the Nova Drive Improvements project for
Town of Davie. The project is currently in construction. The construction scope of
work includes 2521 LF of Exfiltration Trench, 4067 LF of RCP (12” to 30” diameter), 75
storm inlets/manholes, regrading of swales, and associated roadway infrastructure
improvements. The construction cost is $6.3 million. CGA’s professional services
fee for the project is $459,475.
The Nova Drive improvements project (from Davie Road to University Drive) includes
upgrading of the existing roadway with turn lanes, driveway access, bike lanes, and
roadway intersection improvements. The project completed in 2019.
X X
X X
X
X
121
General Planning
Redevelopment Srvcs
Arch Visualizations & 3D
Water / Wastewater Eng
Electrical Engineering
Environmental Srvcs
Website Development
GIS Mapping & Analysis
Surveying and Mapping
Urban Design Traffic Engineering Constr Admin / CEI
Landscape Architecture Civil Engineering Public Outreach
20. EXAMPLE PROJECT
KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
22. YEAR COMPLETED
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
a.
b.
c.
d.
e.
STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS
In-house CGA services provided for this project:
02/2018 - 05/2019 N/A
17
TOWN OF MIAMI LAKeS
Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and
all in-house services identified above.
Biodiversity Survey & Lake Quality Reporting
Carlos Acosta 305.512.7129
Miami Lakes, FL
Director Public Works ACostac@miamilakes-fl.gov
APPROXIMATE PROJECT SIZE:
PROFESSIONAL FEES:
CONSTRUCTION COST:
6.2 Acres
$ 51,891.19
$ N/A
As components of a continuing services contract with the Town, CGA environmental
staff conducted the following two projects:
Bio-Diversity Survey. Conducted the field inspections to collect plant diversity data
within the dense canopy covered 6.2 acres area referred to as ‘Maddens Hammock’.
CGA staff collected field data; photo-documented the site; and produced a report on
the field inspection findings with table of species observed, general comments on
the site condition, invasive species coverage, and condition of native vegetation.
Lake Quality Report. Reported on measures to protect and support the long-term
viability of the Town’s thirty-one (31) man-made lakes that were created between
1962 and 2004. Tasks included gathering and investigating background information
and investigating the current status of the lakes; developing suggested maintenance
and program scenarios; attending public outreach and Town meetings; and producing
Guidelines for Homeowners, for HOA’s, businesses and for the Town, and a report
to the Town outlining maintenance and program options with actionable objectives
and performance measures. The report incorporated water quality samples taken
by the Town.
X
122
General Planning
Redevelopment Srvcs
Arch Visualizations & 3D
Water / Wastewater Eng
Electrical Engineering
Environmental Srvcs
Website Development
GIS Mapping & Analysis
Surveying and Mapping
Urban Design Traffic Engineering Constr Admin / CEI
Landscape Architecture Civil Engineering Public Outreach
20. EXAMPLE PROJECT
KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
22. YEAR COMPLETED
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
a.
b.
c.
d.
e.
STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS
In-house CGA services provided for this project:
2018 - 2019 N/A
18
TOWN OF SURFSIDe
Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and
all in-house services identified above.
Climate Action Plan
Duncan Tavares 305.993.1066
Surfside, FL
Assistant Town Manager DTavares@townofsurfsidefl.gov
APPROXIMATE PROJECT SIZE:
PROFESSIONAL FEES:
CONSTRUCTION COST:
N/A Acres
$ 30,541.72
$ N/A
Calvin, Giordano & Associates, Inc. assisted the Town of Surfside in their continuing
resiliency efforts by providing a series of professional resiliency planning services.
CGA staff began by compiling a history of all resiliency efforts the Town had taken
to date to establish the ‘where we are at now’ point. CGA coordinated with the Town,
and applicable utilities and agencies, and conducted a carbon inventory through the
ICLEI ClearPath™ software and established the emissions baseline for the Town.
CGA developed a Climate Action Plan for the Town containing feasible, tangible
planning policies and actions relating to operations, codes, coordination and public
outreach. CGA created a Climate Crisis document outlining the current and projected
conditions and projections by time frame; a local and regional overview; a review of
shocks, stresses and vulnerabilities; a resource list; and strategic next steps to aid
the Town in defining where they want to be how they will get there. The document
is intended and structured to be a functional tool and serve as a living document to
update as Town measures are implemented and projected conditions are updated.
The Climate Crisis documented also incorporated a Town Beach Dune Report,
that was separately conducted, that outlined the beach renourishment history and
future proposals; current ownership and management structure; current applicable
regulatory structure; dune functions and bests management practices; flora and
fauna considerations; and beach use BPMs and regulations; to aid the Town in
ensuring this protective asset is appropriately managed.
CGA also coordinated with the University of Miami LU_Lab that contributed a
Community Action Tool Kit for inclusion in the Climate Crisis document.
X X X
X X X
X X X
X X X
X X X
123
General Planning
Redevelopment Srvcs
Arch Visualizations & 3D
Water / Wastewater Eng
Electrical Engineering
Environmental Srvcs
Website Development
GIS Mapping & Analysis
Surveying and Mapping
Urban Design Traffic Engineering Constr Admin / CEI
Landscape Architecture Civil Engineering Public Outreach
20. EXAMPLE PROJECT
KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
22. YEAR COMPLETED
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
a.
b.
c.
d.
e.
STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS
In-house CGA services provided for this project:
2013 - 2017 2017
19
CITY OF OAKLAND PARK
Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and
all in-house services identified above.
expanded Lloyd estates Residential & Industrial Improvements
Harris Hamid, Pe 954.630.4477
Oakland Park, FL
Director of Engineering & Community Development Email: N/A
APPROXIMATE PROJECT SIZE:
PROFESSIONAL FEES:
CONSTRUCTION COST:
N/A Acres
$ 960,873.00
$ 7,832,907.00
The Lloyd Estates residential neighborhood is a 17.3 acres area that is bordered
on the north by Prospect Road, on the south by Oakland Park Boulevard, on the
west by Interstate I-95, and on the east by Andrews Avenue in the City of Oakland
Park, Florida. The area has a history of flooding problems due to undersized and/
or damaged underground storm drainage collection systems and poorly graded and
silted in swales. The existing area experiences frequent flood conditions even at low
intensity rain events due to limited discharge capacity and high tail water conditions
downstream of the Sleepy River.
In order to increase the flood protection Level of Service (LOS) for the area, the
Expanded Lloyd Estates Residential and Industrial Improvements (LERIX) project was
designed to provide drainage system improvements including swale reconstruction,
drainage collection system expansion, exfiltration trenches, bio-swale with a tidal
wetland landscape typology, and an emergency pump station with flood gates on the
Sleepy River. The proposed drainage system improvements will be able to mitigate
a considerable amount of damage caused by storm events by providing additional
water quality treatment and storage volume, thereby reducing the durations of flood
conditions. The proposed emergency flood gates and pump station will allow the City
to aid in preventing the backflow of water from the SFWMD C-13 canal into the Lloyd
Estates area and to facilitate the lowering of the Sleepy River flood stages upstream
of the structure so that the existing and proposed drainage system improvements
will function optimally.
The project received a $5,432,550 grant from FEMA under the Hazard Mitigation
Grant Program as a result of Hurricane Wilma. CGA assisted the City with identifying
the funding opportunity and with successfully completing the application process.
X X
X
X
X
X X
124
General Planning
Redevelopment Srvcs
Arch Visualizations & 3D
Water / Wastewater Eng
Electrical Engineering
Environmental Srvcs
Website Development
GIS Mapping & Analysis
Surveying and Mapping
Urban Design Traffic Engineering Constr Admin / CEI
Landscape Architecture Civil Engineering Public Outreach
20. EXAMPLE PROJECT
KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
22. YEAR COMPLETED
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
a.
b.
c.
d.
e.
STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS
In-house CGA services provided for this project:
2019 - Ongoing N/A
20
FDeP
Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and
all in-house services identified above.
Oleta River State Park Roadway Improvements
Theresa R. Carron 850.245.2721
North Miami, FL
Project Manager Theresa.Carron@dep.state.fl.us
APPROXIMATE PROJECT SIZE:
PROFESSIONAL FEES:
CONSTRUCTION COST:
N/A Acres
$ 100,100.41
$ 284,630.55
The Florida Department of Environmental Protection (FDEP) moved forward with
a project to asphalt 0.46 miles of an existing roadway within the Oleta River State
Park located in North Miami adjacent to the north end of Biscayne Bay Aquatic
Preserve. FDEP contracted with CGA to provide survey, civil engineering, permitting,
bid document preparation, and construction administration and Inspection services
for this project.
Due to the location of an existing building and the County’s requirement for the
minimum width of a roadway there were unavoidable direct impacts to 0.07 acres
of highly regulated mature mangrove habitat. CGA environmental staff conducted
all the site assessments and obtained environmental permits from Miami-Dade
Environmental Resource Management, the U.S. Army Corps of Engineers, the South
Florida Water Management District (SFWMD) and obtained an exemption letter
from the Miami Dade Shoreline Development Review Committee. CGA coordinated
with FWS on concerns for impacts to the endangered Florida Bonneted Bat and
coordinated the purchase of mitigation bank credits for the mangrove impacts. The
project required a cumulative impacts analysis for the SFWMD.
X
X
X X
125
General Planning
Redevelopment Srvcs
Arch Visualizations & 3D
Water / Wastewater Eng
Electrical Engineering
Environmental Srvcs
Website Development
GIS Mapping & Analysis
Surveying and Mapping
Urban Design Traffic Engineering Constr Admin / CEI
Landscape Architecture Civil Engineering Public Outreach
20. EXAMPLE PROJECT
KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
22. YEAR COMPLETED
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
a.
b.
c.
d.
e.
STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS
In-house CGA services provided for this project:
2012 - Ongoing
21
TOWN OF SURFSIDe
Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and
all in-house services identified above.
Seawall Replacement
Guillermo Olmedillo 305.861.4863
Surfside, FL
City Manager golmedillo@townofsurfsidefl.gov
APPROXIMATE PROJECT SIZE:
PROFESSIONAL FEES:
CONSTRUCTION COST:
N/A Acres
$ 81,600.00
$ 989,000.00
Calvin, Giordano & Associates, Inc. assisted the Town of Surfside by providing a
series of professional services in the replacement of ten municipally owned seawalls.
CGA staff began by performing an assessment of the Town’s seawalls, ultimately
recommending their replacement due to severe degradation. A solution for replacing
the seawalls was engineered to maximize the serviceable life of the proposed
seawalls.
A benthic analysis was conducted on the seawalls and immediate submerged lands
as part of the permit application process. Permits were obtained from FDEP, USCOE
and Miami-Dade DRER (formerly DERM). Funding to replace the seawalls was
solicited and the project was awarded a $494,000 grant from the Florida Inland
Navigation District (FIND). After obtaining the grant, CGA staff helped to administer
and maintain it throughout the duration of the project.
CGA provided construction management services through the preparation of contract
documents, utility coordination, and inspections. The project was bid in April, 2014.
X
X
126
General Planning
Redevelopment Srvcs
Arch Visualizations & 3D
Water / Wastewater Eng
Electrical Engineering
Environmental Srvcs
Website Development
GIS Mapping & Analysis
Surveying and Mapping
Urban Design Traffic Engineering Constr Admin / CEI
Landscape Architecture Civil Engineering Public Outreach
20. EXAMPLE PROJECT
KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
22. YEAR COMPLETED
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
a.
b.
c.
d.
e.
STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS
In-house CGA services provided for this project:
08/2014 - Ongoing N/A
22
CITY OF SUNNY ISLeS BeACH
Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and
all in-house services identified above.
Sunny Isles Beach emergency Seawall Replacement
Bill evans 305.792.1773
Sunny Isles Beach, FL
Assistant City Manager BEvans@sibfl.net
APPROXIMATE PROJECT SIZE:
PROFESSIONAL FEES:
CONSTRUCTION COST:
N/A Acres
$ 138,285.00
$ 1,300,000.00
On August 4, 2014, Calvin, Giordano & Associates, Inc. was contacted by the City of
Sunny Isles Beach to assist in providing emergency services to replace a collapsed
portion of seawall along the City’s picturesque Intracoastal Park. The seawall
had suffered from deteriorated tie-backs and had exceeded its useable life. The
August rains had increased the loading on the wall, causing the wall to rotate into
waters adjacent to the Intracoastal Waterway. CGA environmental staff immediately
obtained emergency authorization from the jurisdictional agencies to begin repairs,
keeping DERM the USCOE, and DEP continuously apprised of all activity. CGA quickly
responded to the City’s request for design, permitting and construction inspection of
the emergency demolition and replacement. Due to the age and deteriorated state,
the entire 669 linear feet of seawall needed to be replaced.
CGA quickly prepared plans and applications for submittal to DERM, USACE and the
City Building Department for review and approval. CGA expedited the permit review
process while the Contractor was on-site performing emergency repairs.
CGA also provided construction engineering and inspection services throughout the
duration of demolition and construction.
X
X
127
General Planning
Redevelopment Srvcs
Arch Visualizations & 3D
Water / Wastewater Eng
Electrical Engineering
Environmental Srvcs
Website Development
GIS Mapping & Analysis
Surveying and Mapping
Urban Design Traffic Engineering Constr Admin / CEI
Landscape Architecture Civil Engineering Public Outreach
20. EXAMPLE PROJECT
KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
22. YEAR COMPLETED
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
a.
b.
c.
d.
e.
STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS
In-house CGA services provided for this project:
1997 - Ongoing
23
CITY OF DANIA BeACH
Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and
all in-house services identified above.
Miscellaneous engineering Services
Marjorie Craig, Pe 954.924.6800
Dania Beach, FL
Deputy Public Services Director mcraig@daniabeachfl.gov
APPROXIMATE PROJECT SIZE:
PROFESSIONAL FEES:
CONSTRUCTION COST:
N/A Acres
$ N/A
$ N/A
Calvin, Giordano & Associates, Inc. (CGA) has been providing Continuing Professional
Services for the City of Dania Beach’s Public Services Department since 1997.
Historically, CGA has worked on DRC reviews, permit reviews, and water, sewer,
park improvement, drainage and roadway design projects for the City. The current
engineering continuing services contract includes miscellaneous engineering design
projects, such as the current water main improvement project which includes 2000
LF of new 12” watermains, as well as providing “as-needed” services to the Public
Services Department including Civil Engineering, Surveying, Electrical Engineering,
Traffic Engineering, and Construction Services.
The CGA team is currently responsible for review of the engineering/utility/ROW
permit applications submitted through building services department as well as
consultant management and project oversight for city water, sewer, stormwater,
roadway and CIP projects. The CGA team also provides assistance to the Deputy
Director and Director for numerous other public works services such as addressing
resident complaints, miscellaneous tasks for the City Manager, and other city
engineer day to day tasks.
CGA is successfully helping the City by staffing an in-house engineer and
supplementing with additional staff as needed for plans review and other project
related tasks.
X
X X
X
X
X
128
General Planning
Redevelopment Srvcs
Arch Visualizations & 3D
Water / Wastewater Eng
Electrical Engineering
Environmental Srvcs
Website Development
GIS Mapping & Analysis
Surveying and Mapping
Urban Design Traffic Engineering Constr Admin / CEI
Landscape Architecture Civil Engineering Public Outreach
20. EXAMPLE PROJECT
KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
22. YEAR COMPLETED
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
a.
b.
c.
d.
e.
STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS
In-house CGA services provided for this project:
2017 - Ongoing N/A
24
BAL HARBOUR VILLAGe
Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and
all in-house services identified above.
engineering Services
Mike Alvarez, CGC, PWLF 786.566.3562
Bal Harbour Village, FL
Utility Compliance Officer malvarez@balharbourfl.gov
APPROXIMATE PROJECT SIZE:
PROFESSIONAL FEES:
CONSTRUCTION COST:
XXXXX Acres
$ XXX,XXX
$ XXX,XXX
Calvin, Giordano & Associates, Inc. (CGA) began providing professional services to
Bal Harbour Village in 2017. Currently, CGA has a Continuing Engineering Services
Agreement with Bal Harbour Village in order to assist the Village in various design
projects and plan review services. These services include Civil Engineering, Electrical
Engineering, Surveying, GIS, and Construction Services.
On-going services for Bal Harbour Village:
• Building Department Public Works Plan Review and Utilities Plan Review
• Sunshine 811 Services – Manage Dig Tickets and Design Ticket Response
• Florida Department of Environmental Protection – NPDES Annual Reporting,
MDC MS4 TMDL Prioritization Plan and Assessment Plan
• Miami-Dade County Department of Regulatory and Economic Resources
Reporting – Sanitary Sewer System Modeling and Water Usage Reporting
• GIS Database Verification and Updates – Water, Sewer, Drainage, and Site
Lighting
Current Design / Construction Projects
• P.S. No. 1 Drainage Improvements – Project Management, Bidding, Engineering
During Construction, and Construction Services
• Phase-3(a) Infrastructure Improvements – Project Management, Civil
Engineering Design, Bidding, Engineering During Construction, and Construction
Services
• Phase-2(b) Water Main Replacement – Project Management, Exploratory
Investigation via Geotechnical Engineering and Subsurface Underground
Exploratory
• Park Dr. 16” WM Abandonment and Replacement Review – QA/QC of the design
plans, Construction Services.
X
X
X
X X
X
129
General Planning
Redevelopment Srvcs
Arch Visualizations & 3D
Water / Wastewater Eng
Electrical Engineering
Environmental Srvcs
Website Development
GIS Mapping & Analysis
Surveying and Mapping
Urban Design Traffic Engineering Constr Admin / CEI
Landscape Architecture Civil Engineering Public Outreach
20. EXAMPLE PROJECT
KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
22. YEAR COMPLETED
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
a.
b.
c.
d.
e.
STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS
In-house CGA services provided for this project:
2013 - 2018 2018
25
TOWN OF DAVIe
Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and
all in-house services identified above.
Davie Road Phase I and II
jonathan Vogt, Pe 954.797.1113
Davie, FL
Town Engineer jonathan_vogt@davie-fl.gov
APPROXIMATE PROJECT SIZE:
PROFESSIONAL FEES:
CONSTRUCTION COST:
N/A Acres
$ 618,858.00
$ 3,665,749.00-Ph I|$2,400,00.00-Ph II
Phase I: This project, which was partially funded by a FDOT County Incentive
Grant, included the widening of Davie Rd from 4 lanes to 6 lanes between SR 84
and Nova Dr. The scope included adding a median, an additional lane in each
direction, bike lanes, a new signal at Nova Dr and Davie Rd to accommodate the
wider roadway, pedestrian upgrades, tree relocations and removals, drainage and
lighting modifications, utility coordination, and signal modifications at Reese Rd to
accommodate proposed dual left turns from southbound Davie Rd to Reese Rd.
This corridor, faced with constrained right of way, had to accommodate the widening
to six lanes while maintaining right turn lanes where there were existing ones.
Permitting was required through the local drainage district, Broward County Highway
Construction and Engineering Division, FDOT for work near SR 84, SFWMD, and the
Town of Davie. Harmonization with private right of way and changes to access due
to the median, required coordination with the businesses.
Phase II: This phase was funded by a Transportation Enhancement grant through the
FDOT D4, which required it to follow FDOT LAP submittal requirements. It consisted
of improvements to Davie Rd from Nova Dr (SW 24th St) to SW 39th St. The scope
included construction of a landscaped median, widening existing sidewalks, milling
and resurfacing, signing and pavement markings, adding bicycle lanes, drainage,
tree relocations and removals, pedestrian lighting and conventional roadway lighting
modifications. This project also included replacing the school zone flashing beacon
on Davie Rd north of SW 37th St, signal modifications and guide sign assembly at
39 St. Permitting was required through CBWCD, THISCD, SFWMD, Broward County
Highway Construction and Engineering Division (BCHCED), Broward County Traffic
Engineering Division (BCTED), FDOT and the Town of Davie.
X X
X X
X
X
130
General Planning
Redevelopment Srvcs
Arch Visualizations & 3D
Water / Wastewater Eng
Electrical Engineering
Environmental Srvcs
Website Development
GIS Mapping & Analysis
Surveying and Mapping
Urban Design Traffic Engineering Constr Admin / CEI
Landscape Architecture Civil Engineering Public Outreach
20. EXAMPLE PROJECT
KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
22. YEAR COMPLETED
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
a.
b.
c.
d.
e.
STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS
In-house CGA services provided for this project:
2018
26
CITY OF MIAMI BeACH
Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and
all in-house services identified above.
Beachwalk II Phase II from 3rd St to 5th St (LAP Funded)
Daniel Cevallos 305.673.7071
Miami Beach, FL
Project Manager DanielCevallos@miamibeachfl.gov
APPROXIMATE PROJECT SIZE:
PROFESSIONAL FEES:
CONSTRUCTION COST:
N/A Acres
$ N/A
$ 1,629,456.50
This project consisted of the construction of an ongrade ADA compliant pedestrian
15-foot paver walkway, with bollard lights, landscaping and irrigation. Other work
consists of exotic dune vegetation removal and replacement with dune enhancements
such as native dune vegetation species and beach compatible dune fill and irrigation
for the landscaping. The path lighting installation meets Florida Fish and Wildlife
Commission’s marine turtle nesting requirements.
X
131
General Planning
Redevelopment Srvcs
Arch Visualizations & 3D
Water / Wastewater Eng
Electrical Engineering
Environmental Srvcs
Website Development
GIS Mapping & Analysis
Surveying and Mapping
Urban Design Traffic Engineering Constr Admin / CEI
Landscape Architecture Civil Engineering Public Outreach
20. EXAMPLE PROJECT
KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
22. YEAR COMPLETED
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
a.
b.
c.
d.
e.
STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS
In-house CGA services provided for this project:
12/2018 - Ongoing N/A
27
CITY OF SUNNY ISLeS BeACH
Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and
all in-house services identified above.
Collins Avenue (SR A1A) Decorative Lighting
Paul Abbott 305.773.6255
Sunny Isles Beach, FL
City Representative ptgbhtl@aol.com
APPROXIMATE PROJECT SIZE:
PROFESSIONAL FEES:
CONSTRUCTION COST:
N/A Acres
$ N/A
$ 4,830,000.00
Collins Avenue (SR A1A) Decorative Lighting from Bayview Drive to 192nd Street
Project includes the removal of existing conventional lighting poles, installation of
new pole foundations or rehabilitation of existing pole foundations, installation of new
decorative poles, installation of electrical conduits and wires and MOT supervision;
X
132
General Planning
Redevelopment Srvcs
Arch Visualizations & 3D
Water / Wastewater Eng
Electrical Engineering
Environmental Srvcs
Website Development
GIS Mapping & Analysis
Surveying and Mapping
Urban Design Traffic Engineering Constr Admin / CEI
Landscape Architecture Civil Engineering Public Outreach
20. EXAMPLE PROJECT
KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
22. YEAR COMPLETED
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
a.
b.
c.
d.
e.
STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS
In-house CGA services provided for this project:
2012 - 2017 N/A
28
FDOT DISTRICT 4
Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and
all in-house services identified above.
Various General CeI Consultant Construction Support D4
Stacey Sasalay 954.777.4382
Fort Lauderdale, FL
Project Manager Email - N/A
APPROXIMATE PROJECT SIZE:
PROFESSIONAL FEES:
CONSTRUCTION COST:
N/A Acres
$ N/A
$ N/A
C9855 FIN # 228027-8-62-01
CEI Services: Task Work Order (TWO) General Assigned Contract providing various
CEI project staff as needed. Task Wotk Orders (‘IWO) driven Contract. Tasks
assignments to provide experienced staff support as needed to perform construction
engineering inspection and administrative functions that involves multiple projects
at the same time, such as districtwide inspection of signalization and lighting,
asphalt plant inspection, residency contract support, resident compliance support
and scheduling. Over 25 TWO’s have been executed by department since contract
award.
Contract Amount Max: $1,500,000.00
X
133
General Planning
Redevelopment Srvcs
Arch Visualizations & 3D
Water / Wastewater Eng
Electrical Engineering
Environmental Srvcs
Website Development
GIS Mapping & Analysis
Surveying and Mapping
Urban Design Traffic Engineering Constr Admin / CEI
Landscape Architecture Civil Engineering Public Outreach
20. EXAMPLE PROJECT
KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
22. YEAR COMPLETED
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
a.
b.
c.
d.
e.
STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS
In-house CGA services provided for this project:
Ongoing N/A
29
CITY OF FORT LAUDeRDALe
Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and
all in-house services identified above.
CeI Continuing Service Contract
Scott Teschky 954.828.6195
Fort Lauderdale, FL
Senior Project Manager STeschky@fortlauderdale.gov
APPROXIMATE PROJECT SIZE:
PROFESSIONAL FEES:
CONSTRUCTION COST:
N/A Acres
$ N/A
$ N/A
Miscellaneous Engineering & Construction Inspection Services: Ongoing continuing
services contract providing general engineering and inspection services. CEI
services under a continuing contract as authorized by individual Task Orders for
individual projects. It was the intent of the City to use the selected firms on an “as-
needed” basis.
X
134
General Planning
Redevelopment Srvcs
Arch Visualizations & 3D
Water / Wastewater Eng
Electrical Engineering
Environmental Srvcs
Website Development
GIS Mapping & Analysis
Surveying and Mapping
Urban Design Traffic Engineering Constr Admin / CEI
Landscape Architecture Civil Engineering Public Outreach
20. EXAMPLE PROJECT
KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
22. YEAR COMPLETED
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
a.
b.
c.
d.
e.
STANDARD FORM 330 (REV. 8/2016) - SF330-F_CGA_PROjeCTS
In-house CGA services provided for this project:
Ongoing N/A
30
FDOT District 6
Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime Consultant: Project Management and
all in-house services identified above.
Districtwide Miscellaneous CeI Inspection Services
Keith McIntosh 305.640.7438
FDOT District 6, FL
Construction Project Manager keith.mcintosh@dot.state.fl.us
APPROXIMATE PROJECT SIZE:
PROFESSIONAL FEES:
CONSTRUCTION COST:
N/A Acres
$ N/A
$ N/A
C9073 FIN # 250711-5-62-05
CEI Services: Task Wotk Orders (‘IWO) driven Contract. Tasks assignments to
provide experienced staff support as needed to perform construction engineering
inspection and administrative functions that involves multiple projects at the same
time, such as districtwide inspection of signalization and lighting, asphalt plant
inspection, residency contract support, resident compliance support and scheduling.
Approximately 10 TWO’s were executed by department since contract award.
Contract amount max is $1.5 million.
X
135
G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS
26. NAMES OF KEY
PERSONNEL
(From Section E,
Block 12)
29. EXAMPLE PROJECTS KEY
NO.
1
2
3
4
5
NO.
6
7
8
9
10
TITLE OF EXAMPLE PROJECT (From Section F)TITLE OF EXAMPLE PROJECT (From Section F)
27. ROLE IN THIS
CONTRACT
(From Section E,
Block 13)
28. EXAMPLE PROJECTS LISTED IN SECTION F
(Fill in “Example Projects Key” section below before completing
table. Place “X” under project key number for
participation in same or similar role.)
1 2 3 4 5 6 7 8 9 10
STANDARD FORM 330 (REV. 8/2016) - SF330-G_CGA_MATRix
xOverall Project ManagerJenna Martinetti, PE x x x x x x x x
EngineerJames Messick, PE x x x x x
xEngineering/PermittingMohammed Sharifuzzaman, PE x x x x x x x x
Civil EngineerNicholas W. Kanelidis, PE x
EngineerHeidi Belle Henderson, PE
Electrical EngineerJorge R. Cervantes, PE x x x x x
EngineerJulio E. Gonzalez, PE
CAD TechnicianKatharine Kupsky x x x x x x x x x
Surveying and MappingSteven M. Watts, PSM x x x x x x x x
Surveying and MappingPablo Dominguez x x x x x x x
xEnvironmental SpecialistSandra Lee, AiCP CEP, CFM,
LEED AP BD+C x x x x x x
Environmental SpecialistDrew Lindemann x
xLandscape ArchitectTammy Cook-Weedon, PLA,
LEED AP BD+C x x x x x x x x
xLandscape UrbanistGianno Feoli x x x x x x
Landscape ArchitectMichael D. Conner, ASLA, PLA,
iSA x x x x
irrigation/Site DesignMarcos Mendoza x x x x
Landscape DesignerMaria A. Alonso, NCiDQ, ASiD,
ASLA x x
Landscape DesignerDominic James Mack iii, Assoc.
ASLA x x x
xCEi Senior Project EngineerMohamed Mabrouk, PE x
CEi Senior Project EngineerErik Padron, PE
North Bay Road Pedestrian Bridge Andrews Avenue Roadway improvements
Middle Beach Recreational Corridor - Phase ii Dania Jai-Alai Onsite & Offsite improvements
Hallandale Beach NE Quad and SW Drainage improvements Windmill Park Expansion and Renovation
Rickenbacker Causeway Bridge Rehabilitation Rolling Oaks Park - Pedestrian Trail Project
Dr. Von D. Mizell-Eula Johnson State Park Dania Cove Park
Page 1 of 3
136
G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS
26. NAMES OF KEY
PERSONNEL
(From Section E,
Block 12)
29. EXAMPLE PROJECTS KEY
NO.
1
2
3
4
5
NO.
6
7
8
9
10
TITLE OF EXAMPLE PROJECT (From Section F)TITLE OF EXAMPLE PROJECT (From Section F)
27. ROLE IN THIS
CONTRACT
(From Section E,
Block 13)
28. EXAMPLE PROJECTS LISTED IN SECTION F
(Fill in “Example Projects Key” section below before completing
table. Place “X” under project key number for
participation in same or similar role.)
1 2 3 4 5 6 7 8 9 10
STANDARD FORM 330 (REV. 8/2016) - SF330-G_CGA_MATRix
Project AdministratorHugo DaSilvia, PE
xProject AdministratorFelix Garcia, PE
Project AdministratorBernnon Artola
PiO/Landscape inspectorErin Sudman
Senior inspectorReynaldo Alfonso
Senior inspectorLance Robinson
Senior inspector/Senior Bridge
inspectorGary Craig
Senior inspectorJulio Antonio
inspectorVictor Murphy
Assistant PA/CSSReza Shams
Page 1 of 3
North Bay Road Pedestrian Bridge Andrews Avenue Roadway improvements
Middle Beach Recreational Corridor - Phase ii Dania Jai-Alai Onsite & Offsite improvements
Hallandale Beach NE Quad and SW Drainage Improvements Windmill Park Expansion and Renovation
Rickenbacker Causeway Bridge Rehabilitation Rolling Oaks Park - Pedestrian Trail Project
Dr. Von D. Mizell-Eula Johnson State Park Dania Cove Park
137
G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS
26. NAMES OF KEY
PERSONNEL
(From Section E,
Block 12)
29. EXAMPLE PROJECTS KEY
NO.NO.TITLE OF EXAMPLE PROJECT (From Section F)TITLE OF EXAMPLE PROJECT (From Section F)
27. ROLE IN THIS
CONTRACT
(From Section E,
Block 13)
28. EXAMPLE PROJECTS LISTED IN SECTION F
(Fill in “Example Projects Key” section below before completing
table. Place “X” under project key number for
participation in same or similar role.)
STANDARD FORM 330 (REV. 8/2016) - SF330-G_CGA_MATRix
16
17
18
19
2015
14
13
12
11
20191817161514131211
xOverall Project ManagerJenna Martinetti, PE x x x x x
EngineerJames Messick, PE x x x x
xEngineering/PermittingMohammed Sharifuzzaman, PE x x x x x
Civil EngineerNicholas W. Kanelidis, PE x
EngineerHeidi Belle Henderson, PE
Electrical EngineerJorge R. Cervantes, PE x x x
EngineerJulio E. Gonzalez, PE
xCAD TechnicianKatharine Kupsky x x x x x x
xSurveying and MappingSteven M. Watts, PSM x x x x
Surveying and MappingPablo Dominguez x x x
Environmental SpecialistSandra Lee, AiCP CEP, CFM,
LEED AP BD+C x x x x x x
Environmental SpecialistDrew Lindemann x x x x x x
xLandscape ArchitectTammy Cook-Weedon, PLA,
LEED AP BD+C x x x x x x
xLandscape UrbanistGianno Feoli x x x x x
Landscape ArchitectMichael D. Conner, ASLA, PLA,
iSA x x x
irrigation/Site DesignMarcos Mendoza x x x x x
Landscape DesignerMaria A. Alonso, NCiDQ, ASiD,
ASLA x x
Landscape DesignerDominic James Mack iii, Assoc.
ASLA x x
CEi Senior Project EngineerMohamed Mabrouk, PE x
CEi Senior Project EngineerErik Padron, PE
Oak Grove Park improvements Nova Drive improvements
Fire Station Commemorative Plaza Biodiversity Survey & Lake Quality Reporting
SW 2nd Avenue Climate Action Plan
Mills Pond Park Expanded Lloyd Estates Residential & industrial improve.
530 Crandon Boulevard - Civic Center Park Oleta River State Park Roadway improvements
Page 2 of 3
138
G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS
26. NAMES OF KEY
PERSONNEL
(From Section E,
Block 12)
29. EXAMPLE PROJECTS KEY
NO.NO.TITLE OF EXAMPLE PROJECT (From Section F)TITLE OF EXAMPLE PROJECT (From Section F)
27. ROLE IN THIS
CONTRACT
(From Section E,
Block 13)
28. EXAMPLE PROJECTS LISTED IN SECTION F
(Fill in “Example Projects Key” section below before completing
table. Place “X” under project key number for
participation in same or similar role.)
STANDARD FORM 330 (REV. 8/2016) - SF330-G_CGA_MATRix
16
17
18
19
2015
14
13
12
11
20191817161514131211
Project AdministratorHugo DaSilvia, PE
Project AdministratorFelix Garcia, PE
Project AdministratorBernnon Artola
PiO/Landscape inspectorErin Sudman
Senior inspectorReynaldo Alfonso
Senior inspectorLance Robinson
Senior inspector/Senior Bridge
inspectorGary Craig
Senior inspectorJulio Antonio
inspectorVictor Murphy
Assistant PA/CSSReza Shams
Page 2 of 3
Oak Grove Park improvements Nova Drive improvements
Fire Station Commemorative Plaza Biodiversity Survey & Lake Quality Reporting
SW 2nd Avenue Climate Action Plan
Mills Pond Park Expanded Lloyd Estates Residential & industrial improve.
530 Crandon Boulevard - Civic Center Park Oleta River State Park Roadway improvements
139
G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS
26. NAMES OF KEY
PERSONNEL
(From Section E,
Block 12)
29. EXAMPLE PROJECTS KEY
NO.NO.TITLE OF EXAMPLE PROJECT (From Section F)TITLE OF EXAMPLE PROJECT (From Section F)
27. ROLE IN THIS
CONTRACT
(From Section E,
Block 13)
28. EXAMPLE PROJECTS LISTED IN SECTION F
(Fill in “Example Projects Key” section below before completing
table. Place “X” under project key number for
participation in same or similar role.)
STANDARD FORM 330 (REV. 8/2016) - SF330-G_CGA_MATRix
26
27
28
29
3025
24
23
22
21
30292827262524232221
Overall Project ManagerJenna Martinetti, PE x x x x
EngineerJames Messick, PE x x
Engineering/PermittingMohammed Sharifuzzaman, PE x x x
xCivil EngineerNicholas W. Kanelidis, PE x x x
EngineerHeidi Belle Henderson, PE x x
Electrical EngineerJorge R. Cervantes, PE x x x
EngineerJulio E. Gonzalez, PE x
CAD TechnicianKatharine Kupsky x x x
Surveying and MappingSteven M. Watts, PSM x x
Surveying and MappingPablo Dominguez x x
xEnvironmental SpecialistSandra Lee, AiCP CEP, CFM,
LEED AP BD+C x x x
xEnvironmental SpecialistDrew Lindemann x x
Landscape ArchitectTammy Cook-Weedon, PLA,
LEED AP BD+C x x
Landscape UrbanistGianno Feoli x x
Landscape ArchitectMichael D. Conner, ASLA, PLA,
iSA x x
irrigation/Site DesignMarcos Mendoza x x
Landscape DesignerMaria A. Alonso, NCiDQ, ASiD,
ASLA x x
Landscape DesignerDominic James Mack iii, Assoc.
ASLA x
CEi Senior Project EngineerMohamed Mabrouk, PE x x x x x x x
CEi Senior Project EngineerErik Padron, PE x x x x x x
Seawall Replacement Beachwalk ii Phase ii from 3rd St to 5th St (LAP Funded)
Sunny isles Beach Emergency Seawall Replacement Collins Avenue (SR A1A) Decorative Lighting
Miscellaneous Engineering Services - Dania Beach Various General CEi Consultant Construction Support D4
Engineering Services - Bal Harbour Village CEi Continuing Service Contract
Davie Road Phase i and ii Districtwide Miscellaneous CEi inspection Services
Page 3 of 3
140
G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS
26. NAMES OF KEY
PERSONNEL
(From Section E,
Block 12)
29. EXAMPLE PROJECTS KEY
NO.NO.TITLE OF EXAMPLE PROJECT (From Section F)TITLE OF EXAMPLE PROJECT (From Section F)
27. ROLE IN THIS
CONTRACT
(From Section E,
Block 13)
28. EXAMPLE PROJECTS LISTED IN SECTION F
(Fill in “Example Projects Key” section below before completing
table. Place “X” under project key number for
participation in same or similar role.)
STANDARD FORM 330 (REV. 8/2016) - SF330-G_CGA_MATRix
26
27
28
29
3025
24
23
22
21
30292827262524232221
Project AdministratorHugo DaSilvia, PE x x x x
Project AdministratorFelix Garcia, PE x x x x
Project AdministratorBernnon Artola x x x
PiO/Landscape inspectorErin Sudman x x x x
Senior inspectorReynaldo Alfonso x x x x
Senior inspectorLance Robinson x x x
Senior inspector/Senior Bridge
inspectorGary Craig x x x
Senior inspectorJulio Antonio x x x x
inspectorVictor Murphy x x x
Assistant PA/CSSReza Shams x x x
Page 3 of 3
Seawall Replacement Beachwalk ii Phase ii from 3rd St to 5th St (LAP Funded)
Sunny isles Beach Emergency Seawall Replacement Collins Avenue (SR A1A) Decorative Lighting
Miscellaneous Engineering Services - Dania Beach Various General CEi Consultant Construction Support D4
Engineering Services - Bal Harbour Village CEi Continuing Service Contract
Davie Road Phase i and ii Districtwide Miscellaneous CEi inspection Services
141
142
143
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)163
5. NAME OF FIRM
PART I - CONTRACT-SPECIFIC QUALIFICATIONS
ARCHITECT - ENGINEER QUALIFICATIONS
A. CONTRACT INFORMATION
1. TITLE AND LOCATION (City and State)
2. PUBLIC NOTICE DATE 3. SOLICITATION OR PROJECT NUMBER
B. ARCHITECT-ENGINEER POINT OF CONTACT
C. PROPOSED TEAM
(Complete this section for the prime contractor and all key subcontractors.)
4. NAME AND TITLE
8. E-MAIL ADDRESS7. FAX NUMBER6. TELEPHONE NUMBER
(Check)PRIMEJ-V PARTNERSUBCON- TRACTOR9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT
a.
b.
c.
d.
e.
f.
STANDARD FORM 330 (REV. 8/2016)
D. ORGANIZATIONAL CHART OF PROPOSED TEAM (Attached)
CHECK IF BRANCH OFFICE
CHECK IF BRANCH OFFICE
CHECK IF BRANCH OFFICE
CHECK IF BRANCH OFFICE
CHECK IF BRANCH OFFICE
CHECK IF BRANCH OFFICE
AUTHORIZED FOR LOCAL REPRODUCTION
x
Chrome Engineering, Inc.16650 N. Kendall Drive, Suite 205
Miami, Florida 33196
Structural Engineering Services for
transit and transportation related
structures (bridges, walls, signs) as
well as facilities (i.e. pump stations
buildings, etc.)
Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01, Sunny Isles Beach, Florida
August 11th, 2020 RFQ No. 20-07-01
Oscar J. Cruz, P.E., President
Chrome Engineering, Inc.
(305) 432-6826 n/a ocruz@chromeeng.com
x
164
12. NAME 13. ROLE IN THIS CONTRACT
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
14. YEARS EXPERIENCE
b. WITH CURRENT FIRMa. TOTAL
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization)
15. FIRM NAME AND LOCATION (City and State)
STANDARD FORM 330 (REV. 8/2016) PAGE 2
a.
b.
c.
d.
(1) TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
e.
Check if project performed with current firm
Check if project performed with current firm
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
Check if project performed with current firm
Check if project performed with current firm
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Oscar J. Cruz, P.E.Senior Structural Engineer
20 2
Chrome Engineering, Inc. Miami, Florida
BS Civil Engineering, FIU, Dec. 2000
MS Structural Engineering Courses, 2006
Professional Qualifications/Training:Temporary Traffic Control (TTC) Advanced Level, FDOT 2019
OpenBridge Designer (Bentley) FLUG Training Forum, 2019.
G-72E Control Structure, Hialeah Gardens, Florida (FDOT D6 Project)
Structural Engineer in charge of the calculations and plans for a South Florida Water Management District Control Structure within the
C-7 canal in Miami-Dade County. Services include the design of a cast in place concrete twin box culvert, anchored steel sheet pile
walls, cast in place wing walls and spilling well steel platforms. Responsibilities included the preparation of construction cost estimates
and project specifications. Construction Cost: $2M.
2019 2020 (anticipated)
Florida Professional Engineer
License # 63889 (2006)
Bridge design and bridge rehabilitation projects, including
fender replacements, retaining walls (MSE and CIP), critical sheet pile walls, seawalls, sound barrier walls, FDOT Tri-Chord sign structures
(Cantilever, Butterfly and Span), ITS structures, mast arms, strain poles, light poles, box culverts, corrugated pipe culverts, steel structures
well as bridge load ratings. Seminars: OpenBridge Designer FLUG Training Forum, 2019. FDOT Advanced MOT, 2019. FES Member (2016)
x
2019 2020
Hard Rock Stadium Pedestrian Bridges and Tunnels, Miami Gardens, Florida
(City of Miami Gardens Project)
Structural Engineer in charge of shop drawings verification and design calculations review for 2 prefabricated truss bridges and 2 precast
concrete arch tunnels constructed at the Hard Rock Stadium in Miami Gardens, Florida. Design elements included steel design, steel
sheet piling, MSE Wall control drawings, joints, bearing plates and waterproofing systems among others. Responsibilities also included
assisting the CEI team with structural design related RFI’s, and the installation of illuminated signs to the existing trusses. Const. cost: $12M.
x
MacArthur Causeway East Bridge Repairs, Miami, Florida (FDOT D6 Project)2019 2020
EOR in charge of the preparation of an Engineering Analysis Report (EAR) required for the presence of non-structural deck cracks
found in the structure after the completion of partial concrete deck replacement. Analysis involved site inspections, analysis and
recommendations following the requirements of FDOT Specifications 400-21.4 and 400-21.5. Responsibilities also included Load
Ratings to allow heavy equipment to be carried by the bridge as well as a temporary work platform at Pier 26. Construction Cost: $6M
x
311 & 911 Support Area Renovation, Doral, Florida (Miami-Dade County Project)
2019 2021 (anticipated)
Structural EOR for the construction of a two level 8,500 square foot area at the Lightspeed Facility in Miami-Dade County, Florida.
The two level structure will be built within an existing building and is designed to support mechanical equipment at the mezzanine level
and to provide accommodations for the staff responding to 311 and 911 calls. The proposed supporting frame are steel columns and beams
supported on concrete foundations. The roof is supported by steel joists. Construction Cost: $1M.
DW Local Government In-Depth Bridge Inspection; Miami-Dade County, Florida
(FDOT District 6 Project)2019 n/a
Structural Engineer assisting with the structural inspections for multiple Local Government owned Bridges. Activities included the Bridge
Inspection Report preparation using BrM and BMS for 20 bridges with multiple owners including, Miami-Dade County, City of Miami
Beach, City of Homestead and Miami-Dade Transit. Bridge types ranged from CIP slabs, pretressed slab units and steel configurations
all supported on pile foundations. QA/QC of load rating reports to confirm that rating values were accurately reported in BrM. Fee: $70K.
x
165
12. NAME 13. ROLE IN THIS CONTRACT
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
14. YEARS EXPERIENCE
b. WITH CURRENT FIRMa. TOTAL
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization)
15. FIRM NAME AND LOCATION (City and State)
STANDARD FORM 330 (REV. 8/2016) PAGE 2
a.
b.
c.
d.
(1) TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
e.
Check if project performed with current firm
Check if project performed with current firm
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
Check if project performed with current firm
Check if project performed with current firm
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Jorge A. Canales, P.E.Senior Structural Engineer (QA/QC)
50 2
Chrome Engineering, Inc. Miami, Florida
BS Civil Engineering, University of Missouri, 1978
BS Building Engineering Lincoln University, 1968
G-72E Control Structure, Hialeah Gardens, Florida (FDOT D6 Project)
Structural Engineer in charge of the quality control for calculations and plans for a South Florida Water Management District Control
Structure within the C-7 canal in Miami-Dade County. Services include the design of a cast in place concrete twin box culvert, anchored
steel sheet pile walls, cast in place wing walls and spilling well steel platforms. Responsibilities included the preparation of construction
cost estimates and project specifications. Construction Cost: $2M.
2019 2020 (anticipated)
Florida Professional Engineer
License # 60444 (2003)
x
2019 2020
Hard Rock Stadium Pedestrian Bridges and Tunnels, Miami Gardens, Florida
(City of Miami Gardens Project)
Structural Engineer in charge of shop drawings verification and design calculations review for 2 prefabricated truss bridges and 2 precast
concrete arch tunnels constructed at the Hard Rock Stadium in Miami Gardens, Florida. Design elements included steel design, steel
sheet piling, MSE Wall control drawings, joints, bearing plates and waterproofing systems among others. Responsibilities also included
assisting the CEI team with structural design related RFI’s, and the installation of illuminated signs to the existing trusses. Const. cost: $12M.
x
Port Everglades Bond Survey, Broward County Public Works Department
Seaport Engineering and Construction Division 2015 n/a
Senior Inspector. Responsible for the visual inspection of the structural seawalls, fender systems and bollards, cruise terminals building
parking garage structures and over 20 buildings structures own and maintain by the Port Authority. Additionally a list of the found
deficiencies were presented along with an probable estimate of construction cost. Design Fee: $150K.
x
Miami Dade Expressway Auhority, Asset Management Contract - Bridges,
Signs and High Masts, Miami-Dade County, Florida 2010 n/a
Project Manager. Responsible for the management of inspection teams including the execution of the planning, scheduling and
inspections of bridges, signs and high mast poles in Miami-Dade County within the MDX system, for the last four years. Coordination
with MDX personnel in preparing and updating a data based system for work recommendations. Responsible for the preparation of work
recommendations in the FDOT MMS. Contract Fee: $1.5M.
FDOT District 6, Districtwide Bridge Design of Minor and Major Structural Repairs.
SR 5 (US 1) at Snake Creek , Monroe County, Florida.2005 2006
Project Manager responsible for the special inspection, design and preparation of contract documents for the rehabilitation/repairs of
bascule bridge north approach slab and the construction of a steel sheet piling wall along the ocean side to stabilized the movement of
the north embankment. Provided engineering support during the post-design services, reviewed shop drawings and/or revision to the
plans due to unanticipated field conditions. Construction Cost: $2M
Mr. Canales provides technical expertise in the design
and plan preparation, construction and inspection of highway structures and educational facilities. He has been responsible for the prelimi-
nary and final design of various highway structures located in multiple states, provides in-house quality control and quality assurance in the
design and plan preparation of highway and building structures, and roadway design for state and local municipal agencies.
166
12. NAME 13. ROLE IN THIS CONTRACT
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
14. YEARS EXPERIENCE
b. WITH CURRENT FIRMa. TOTAL
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization)
15. FIRM NAME AND LOCATION (City and State)
STANDARD FORM 330 (REV. 8/2016) PAGE 2
a.
b.
c.
d.
(1) TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
e.
Check if project performed with current firm
Check if project performed with current firm
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
Check if project performed with current firm
Check if project performed with current firm
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Gregory P. Dover, P.E.Senior Structural Engineer
29 1
Chrome Engineering, Inc. Miami, Florida
BS Civil Engineering, North Carolina State University, 1990
2020 2020
Florida Professional Engineer License # 57684 (2001)
North Carolina Professional Engineer License # 020635 (1995)
South Carolina Professional Engineer License # 20273 (2000)
x
x
Henry Kinney Tunnel Rehabilitation and Pedestrian Plaza Structure,
Ft. Lauderdale, Florida (FDOT District 4 Project)2016 2019
Project manager and EOR for the design of sign and signal structures approaching the tunnel, including DMS signs, entrance gates,
over-height vehicle detection structures, and the Pedestrian Plaza Structure (tunnel extension) to capture urban space for pedestrians
along the Las Olas Riverwalk in Ft. Lauderdale. Proposed modification to this category 2 structure, required close coordination with
FDOT Central office, FDOT D4 structures, D4 maintenance, City of Ft. Lauderdale and other stakeholder agencies. Const. Cost: $6M.
2017 2019
7-Mile Bridge Rehabilitation, Monroe County, Florida
(FDOT District 6 Project)2009 2019
Structural Engineer for the rehabilitation of a 35,000-foot-long bridge over the ocean, which is a critical bridge linked to the Florida Keys.
This bridge is in the most extreme corrosive marine environment possible, with structural elements permanently in the splash zone
resulting in accelerated corrosion, and constant cracks, spalls, and delaminations. Responsibilities included assessment of the existing
structural condition and preparation of a design and plans for the bridge rehabilitation and for corrosion protection systems.
Mr. Dover's primary structural experience is in concrete and
steel bridge design, including advanced structural modeling, and bridge inspection, as well as miscellaneous structures design ranging from
retaining walls, overhead signs, traffic signals, to buried drainage structures. His experience includes phase review, design management,
and construction project management. Work experience includes private, municipal, county, state, and federal clients.
MacArthur Causeway East Bridge Repairs, Miami, Florida (FDOT D6 Project)
Structural Engineer assisting in the design of a temporary work platform at Pier 26 required for the implementation of concrete
rehabilitation repairs for the existing pier cap. Greg completed the timber design for the proposed temporary platform and reviewed
structural calculations and plans submitted to the contractor for submittal to FDOT. Construction Cost: $6M
Port Everglades Access Ramps, Ft. Lauderdale, Florida 2020 2020
Structural Engineer assisting in the design of a temporary bracing system to support the proposed AASHTO Type II, III and IV beams
specified for the construction of two access ramps at terminal 4 of Port Everglades in Broward County, Florida. Mr. Dover prepared
calculations for the tension member coil rod and compression member timber frames and specified the required location for each
of the multiple spans under construction. Construction Cost: $7M.
SW 136th Street Bridge Replacement, Miami, Florida.
(Miami-Dade County Project)
EOR and Project Manager for a replacement of a bridge on SW 136th St. over a canal. Bridge was designed as a 3-span continuous
deck slab, supported on pile bents and pile end bents. Special bridge aesthetics were coordinated with the County and municipalities to
further enhance the end user experience. This project required the incorporation of the approach roadway including sidewalks as well
as the preparation of MOT plans to ensure access was provided at all times to vehicles and pedestrians. Construction Cost: $1.5M.
167
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
a. PROJECT OWNER
21. TITLE AND LOCATION (City and State)
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
20. EXAMPLE PROJECT KEY
NUMBER
a.
b.
c.
d.
e.
f.
(1) FIRM NAME (2) FIRM LOCATION (City and State)
(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State)
(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State)
(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State)
STANDARD FORM 330 (REV. 8/2016) PAGE 3
(3) ROLE
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
b. POINT OF CONTACT NAME
23. PROJECT OWNER'S INFORMATION
c. POINT OF CONTACT TELEPHONE NUMBER
(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State)
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)G-72E Control Structure, Hialeah Gardens, Florida
FDOT D6 & SFWMD Daniel Raymat, P.E.(305) 338-7782
1
2019 2020 (Anticipated)
Construction Document preparation for South Florida Water Management District's G72-E Control Structure within the (SFWMD) C-7 canal.
Services include the design of a cast in place concrete twin box culvert, anchored steel sheet pile walls, cast in place wing walls and
two spilling well steel platforms, preparation of construction cost estimates and project specifications.
The proposed control structure is approximately 90ft long x 20' high. The cast in place box culvert is a twin box 7' wide x 7' high.
The proposed steel sheet pile walls are anchored, and range from 15' to 25' in height with a total length of 90'.
The proposed spilling well platforms are approximately 23' long, composed of steel framing supported on precast piles.
Approximate Construction Cost is $2.0M. This design project requires extensive coordination to ensure constructable plans are prepared,
overall structure dimensions were optimized for functionality and operations via multidisciplinary coordination workshops.
Chrome Engineering, Inc.Miami, Florida Structural Engineer
(Pictures of similar project)
168
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
a. PROJECT OWNER
21. TITLE AND LOCATION (City and State)
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
20. EXAMPLE PROJECT KEY
NUMBER
a.
b.
c.
d.
e.
f.
(1) FIRM NAME (2) FIRM LOCATION (City and State)
(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State)
(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State)
(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State)
STANDARD FORM 330 (REV. 8/2016) PAGE 3
(3) ROLE
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
b. POINT OF CONTACT NAME
23. PROJECT OWNER'S INFORMATION
c. POINT OF CONTACT TELEPHONE NUMBER
(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State)
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
FDOT D6 & City of Miami Gardens Erik Sibila, P.E.(305) 283-9816
2
2019 2019
Construction of 2 prefabricated steel truss bridges over NW 199 St. and 2 precast concrete arch tunnels constructed at the Hard Rock
Stadium in Miami Gardens, Florida. Design elements included steel trusses, steel sheet piling, MSE Wall control drawings, joints, bearing
plates, prestressed piles and waterproofing systems among others. Responsibilities included assisting the Construction Engineering
Inspection team with multiple shop drawing reviews and structural design RFI's. Reviews such as bridge erection plans showing the size
and location of proposed cranes for bridge installations required extensive coordination between structural load capacities and
crane operations. Approximate Construction Cost is $15M. This design build project requires concurrent and efficient shop drawing reviews
and responses to RFI's. Approvals and modifications to any submittal were based on strict adherence to the project specifications and
public safety. An additional task included the design of decorative signs attached to the existing steel truss elements.
Chrome Engineering, Inc.Miami, Florida Structural Engineer
Hard Rock Stadium Pedestrian Bridges and Tunnels,
Miami Gardens, Florida
169
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
a. PROJECT OWNER
21. TITLE AND LOCATION (City and State)
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
20. EXAMPLE PROJECT KEY
NUMBER
a.
b.
c.
d.
e.
f.
(1) FIRM NAME (2) FIRM LOCATION (City and State)
(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State)
(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State)
(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State)
STANDARD FORM 330 (REV. 8/2016) PAGE 3
(3) ROLE
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
b. POINT OF CONTACT NAME
23. PROJECT OWNER'S INFORMATION
c. POINT OF CONTACT TELEPHONE NUMBER
(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State)
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
FDOT D6 Fernando Sanchez, MSCE (305) 989-9646
3
2019 2020
Rehabilitation Project for the MacArthur East Bridge connecting the city of Miami Beach with the city of Miami. The bridge was built in
1957. It is 2,155' long and 34 sections of approach of pre-tensioned concrete beams, 15 of them 45' long and remaining 19 are 65' long, as
well as 3 main sections of continuous steel beams (70', 105', 70'). LEAD Engineering Contractors assigned Chrome Engineering with
specialized engineering design services, including an Engineering Analysis Report (EAR) for the evaluation of non-structural deck cracks
found after repairs were performed on the bridge. Our Structural Engineers also provided a Load Rating analysis of the existing steel spans
to support the proposed steel painting equipment needed for the rehabilitation of the existing steel beams (main spans).
In addition Chrome Engineering Inc., prepared plans and calculations for a steel and timber temporary platform required for access to perform
repairs to Pier 26's concrete cap. The proposed platform is supported from the existing concrete cap and hangs from the existing
concrete deck. The approximate overall bridge repairs construction cost is $10M.
Chrome Engineering, Inc.Miami, Florida Structural Engineer
MacArthur Causeway East Bridge Repairs, Miami, Florida
170
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
a. PROJECT OWNER
21. TITLE AND LOCATION (City and State)
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
20. EXAMPLE PROJECT KEY
NUMBER
a.
b.
c.
d.
e.
f.
(1) FIRM NAME (2) FIRM LOCATION (City and State)
(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State)
(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State)
(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State)
STANDARD FORM 330 (REV. 8/2016) PAGE 3
(3) ROLE
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
b. POINT OF CONTACT NAME
23. PROJECT OWNER'S INFORMATION
c. POINT OF CONTACT TELEPHONE NUMBER
(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State)
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
FDOT D6 Alina Fernandez, PE (305) 215-2987
4
2016 2019
The project included the design and analysis calculations for existing and proposed signal mast arms throughout Miami-Dade County to
incorporate safety improvements throughout the county. Modifications included backplate installations to new and existing mast arm
structures, the addition of of signal heads (from 3 section heads to 5 section heads). Structural analysis reports were prepared following
AASHTO LRFDLTS1, LTS-6 and LTS-6 with Appendix C, as modified by the FDOT Structures Manual. Improvements were implemented
at the following intersections: SR 25/ Okeechobee Road and West 12th Ave/NW 74th Street, SW 72nd Street (Sunset Drive) and SW 87th
Avenue as well as NW 12th Avenue from SW 8th Street to NW 14th Street in Miami, Florida. Approximate construction cost is $1M.
Mr. Oscar J. Cruz, P.E. and Mr. Gregory P. Dover, P.E. both provided structural engineering services for this contract during their previous
employment at Gannett-Fleming's Miami office.
Chrome Engineering, Inc.Miami, Florida Structural Engineer
FDOT District 6 Professional Engineering Design Consulting Services Districtwide.
Miami, Florida
New Signals with Backplates (SW 72nd Street)New Signals with Backplates (SW 87th Avenue)
171
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
a. PROJECT OWNER
21. TITLE AND LOCATION (City and State)
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
20. EXAMPLE PROJECT KEY
NUMBER
a.
b.
c.
d.
e.
f.
(1) FIRM NAME (2) FIRM LOCATION (City and State)
(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State)
(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State)
(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State)
STANDARD FORM 330 (REV. 8/2016) PAGE 3
(3) ROLE
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
b. POINT OF CONTACT NAME
23. PROJECT OWNER'S INFORMATION
c. POINT OF CONTACT TELEPHONE NUMBER
(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State)
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Miami-Dade County, ISD Burton H. Hersh, AIA (305) 446-4877
5
2019 2020 (Anticipated)
Chrome Engineering, Inc., prepared structural plans and calculations for the construction of a two level 8,500 square foot area at the
Lightspeed Facility in Miami-Dade County, Florida. The two level structure will be built within an existing building and is designed to support
mechanical equipment at the mezzanine level and to provide accommodations for the staff responding to 311 and 911 calls. The proposed
supporting frame are steel columns and beams supported on concrete foundations. The roof is supported by steel joists. Chrome Engineering
also prepared the structural section of the project specifications manual. The design for this enhancement facility is based on the 2017 Florida
Building Code (6th Edition).
Chrome Engineering, Inc.Miami, Florida Structural Engineer
311 & 911 Support Area Renovation, Doral, Florida
172
TITLE OF EXAMPLE PROJECT (From Section F)
G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS
1
2
3
4
5
6
7
8
9
10
STANDARD FORM 330 (REV. 8/2016) PAGE 4
26. NAMES OF KEY
PERSONNEL
(From Section E, Block 12)
27. ROLE IN THIS
CONTRACT
(From Section E, Block 13)
1 2 3 4 5 6 7 8 9 10
29. EXAMPLE PROJECTS KEY
NUMBER TITLE OF EXAMPLE PROJECT (From Section F)NUMBER
28. EXAMPLE PROJECTS LISTED IN SECTION F
(Fill in "Example Projects Key" section below before completing table.
Place "X" under project key number for participation in same or similar role.)
Oscar J. Cruz, P.E.Senior Structural Engineer X X
X XJorge A. Canales, P.E.Senior Structural Engineer
G-72E Control Structure, Hialeah Gardens, Florida
Hard Rock Stadium Pedestrian Bridges and Tunnels,
Miami Gardens, Florida
XGregory P. Dover, P.E.Senior Structural Engineer
X
X
X
MacArthur Causeway East Bridge Repairs, Miami,
Florida
FDOT District 6 Professional Engineering Design
Consulting Services Districtwide, Miami, Florida
X
311 & 911 Support Area Renovation, Doral, Florida
X
X
X
173
H. ADDITIONAL INFORMATION
30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED.
I. AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts.
31. SIGNATURE 32. DATE
33. NAME AND TITLE
STANDARD FORM 330 (REV. 8/2016) PAGE 5
Chrome Engineering, Inc., was founded in 2018 as a local engineering company with the objective to provide civil and structural design
consulting services for the multiple ongoing and planed projects within our area. We are prequalified to provide structural engineering
services with the Florida Department of Transportation and Miami-Dade County. We are also listed as an FDOT disadvantaged business
enterprise (DBE) with the State of Florida and Small Business Enterprise (SBE) with Miami-Dade County.
the following is a list of our structural engineering services experience:
a. Pedestrian and Highway Bridges (New, Widening and Rehabilitations including PD&E projects)
b. Seawalls, Retaining Walls and Bulkhead Walls
c. Water Control Structures
d. Pump Stations structural analysis
e. Signal Mast Arms (Standard and Decorative)
f. Structural Inspections (Buildings/Educational Facilities and Bridges)
g. ITS Structures (DMS, ADMS, CCTV poles, Tolling)
h. Decorative Light poles (Including solar power alternatives)
i. Bus Shelters & Pedestrian Canopies
j. Storage Tanks
k. Concrete Box Culverts
l. Pipe Culverts (Steel and Corrugated Aluminum)
m. Safety Bollards
n. Sign Structures (Standard and Decorative)
o. Structural Inspections (Buildings/Educational Facilities and Bridges)
p. Services during Construction: Shop Drawing Reviews & RFI’s
q. Specialty Engineering Services
r. Constructability Reviews, Cost Estimation and Value Engineering assignments.
Chrome Engineering’s structural staff has participated in dozens of local, national and international civil engineering projects and has
developed vast expertise, not only in structural design, but also in the preparation of renderings and 3-d models to ensure that the client
vision for projects is clearly expressed in the design documents. We have prepared construction cost estimates that accurately reflect the
final costs for multiple projects. Our Team’s experience includes taking structural design plans thru construction within schedule and budget.
Our combined staff experience includes projects for all FDOT Districts including the Turnpike, as well as MDX, Miami-Dade County, Broward
County, Collier County, Pinellas County, City of Doral, City of Miami Gardens and City of Hialeah among many others.
Chrome Engineering, Inc., has continued to work during these difficult times and has all the necessary tools to communicate remotely, via
secured applications such as Microsoft Teams. We utilize file sharing applications such as Microsoft OneDrive and Projectwise, to make sure
we are all working with the most recent version of project information.
Oscar J. Cruz, P.E., President
08/11/2020
174
PART II - GENERAL QUALIFICATIONS
(If a firm has branch offices, complete for each specific branch office seeking work.)
a. SIGNATURE
ARCHITECT-ENGINEER QUALIFICATIONS
2a. FIRM (or Branch Office) NAME
2b. STREET
2c. CITY 2d. STATE 2e. ZIP CODE
3. YEAR ESTABLISHED 4. UNIQUE ENTITY IDENTIFIER
5. OWNERSHIP
b. Discipline c. Number of Employees
10. PROFILE OF FIRM'S EXPERIENCE
AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS
b. Experience c. Revenue Index
Number
(see below)
STANDARD FORM 330 (REV. 8/2016) PAGE 6
1. SOLICITATION NUMBER (If any)
8a. FORMER FIRM NAME(S) (If any)8b. YEAR ESTABLISHED
9. EMPLOYEES BY DISCIPLINE
Total
(1) FIRM (2) BRANCH
1. Less than $100,000
2. $100,000 to less than $250,000
3. $250,000 to less than $500,000
4. $500,000 to less than $1 million
5. $1 million to less than $2 million
11. ANNUAL AVERAGE PROFESSIONAL
SERVICES REVENUES OF FIRM
FOR LAST 3 YEARS
(Insert revenue index number shown at right)
7. NAME OF FIRM (If Block 2a is a Branch Office)
6a. POINT OF CONTACT NAME AND TITLE
6c. E-MAIL ADDRESS
8c. UNIQUE ENTITY IDENTIFIER
a. Federal Work
b. Non-Federal Work
c. Total Work
12. AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts.
b. DATE
c. NAME AND TITLE
a. Function
Code
a. Profile
Code
6b. TELEPHONE NUMBER
a. TYPE
b. SMALL BUSINESS STATUS
PROFESSIONAL SERVICES REVENUE INDEX NUMBER
6. $2 million to less than $5 million
7. $5 million to less than $10 million
8. $10 million to less than $25 million
9. $25 million to less than $50 million
10. $50 million or greater
Other Employees
Chrome Engineering, Inc.
16650 N. Kendall Drive, Suite 205
Miami FL 33196
Oscar J. Cruz, P.E., President
(305) 432-6826 ocruz@chromeeng.com
RFQ No. 20-07-01
2018
Corporation
FDOT SBE and DBE, MDC SBE
57 Structural Engineer
B02
Rehabilitation (Buildings; Structures; Facilites)
Structural Design; Special Structures
Bridges
Tunnels & SubwaysT06
R06
S09
3
4 08 CADD Technician 2
2
2
2
3
1
2
2
Oscar J. Cruz, P.E., President
08/11/2020
087465862
175
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)176
177
178
179
180
181
182
183
184
185
186
187
188
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)189
STANDARD FORM 330 (REV. 8/2016)
ARCHITECT - ENGINEER QUALIFICATIONS
PART I - CONTRACT-SPECIFIC QUALIFICATIONS
A. CONTRACT INFORMATION
1. TITLE AND LOCATION (City and State)
Continuing Professional Consulting Services (CCNA) – The City of Sunny Isles Beach
2. PUBLIC NOTICE DATE
3. SOLICITATION
OR PROJECT
NUMBER
20-07-01 B. ARCHITECT-ENGINEER POINT OF CONTACT
4. NAME AND TITLE
Raj Krishnasamy, P.E., President/ Principal Engineer
5. NAME OF FIRM
TIERRA SOUTH FLORIDA, Inc. (TSF)
6. TELEPHONE NUMBER
(561) 687-8536
7. FAX NUMBER
(561) 687-8570
8. E-MAIL ADDRESS Raj@TSFGeo.com
C. PROPOSED TEAM
(Complete this section for the prime contractor and all key subcontractors.)
(Check)
9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT PRIME J-V PARTNER SUBCON-TRACTOR a. X
CHECK IF BRANCH OFFICE
2765 Vista Parkway, Suite 10 West Palm Beach, FL 33411
Geotechnical Engineering
b.
CHECK IF BRANCH OFFICE
c.
CHECK IF BRANCH OFFICE
d.
CHECK IF BRANCH OFFICE
D. ORGANIZATIONAL CHART OF PROPOSED TEAM (Attached)
190
STANDARD FORM 330 (REV. 8/2016)
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME
Raj Krishnasamy, P.E.
13. ROLE IN THIS CONTRACT
Principal-in-Charge, Principal Engineer
14. YEARS EXPERIENCE
a. TOTAL
33
b. WITH CURRENT FIRM
20 15. FIRM NAME AND LOCATION (City and State) TIERRA SOUTH FLORIDA, INC. (TSF) West Palm Beach, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) BS Civil Engineering, Christian Brothers University, 1987 MS Civil Engineering, University of Memphis, 1996
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Engineer, Florida No. 53567
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) American Society of Highway Engineers, Past President, Florida Engineering Society, Past Treasurer Geotechnical Material Engineering Council, Past Chairman
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
Gateway Park Pedestrian Bridge,
City of Sunny Isles Beach, Florida
(2) YEAR COMPLETED PROFESSIONAL SERVICES 2014
CONSTRUCTION (If applicable)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Krishnasamy was the Principal-in-Charge of the Geotechnical Engineering Services for the Gateway Park Pedestrian Bridge located in The City of Sunny Isles, Florida. The project consists of the construction of a new pedestrian bridge over State Road No. 826 Westbound. The purpose of this study was to explore the subsurface conditions within or in close proximity to the pedestrian bridge to enable an evaluation of foundations for the construction. Provided a geotechnical engineering report including geotechnical evaluations and recommendations regarding foundation, bridge, pile monitoring and construction considerations regarding excavations. Completed on time and within budget.
b.
(1) TITLE AND LOCATION (City and State)
Samson Oceanfront Park,
City of Sunny Isles Beach, Florida.
(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2016 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Krishnasamy was the Principal-in-Charge of the Auger-Cast Pile Inspection and Construction Material Testing Services for the Samson Oceanfront Park located in the City of Sunny Isles Beach, Florida. The project consists of a compact beach park with a playground, pavilion and showers. A TSF Senior Engineer provided review of daily reports, handled project coordination and attended meetings as necessary. Completed on time and within project.
c.
(1) TITLE AND LOCATION (City and State)
SW 42 Street (Bird Road Extension) From SW 162 Avenue to SW 157
Avenue, Miami-Dade County, Florida
(2) YEAR COMPLETED PROFESSIONAL SERVICES 2020
CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Krishnasamy was the Principal-in-Charge of the Geotechnical Engineering Services for the widening project of Bird Road Extension from SW 162nd Ave to SW 15th Avenue in Miami-Dade County. The roadway limits are approximately 3,100 lineal feet in length. Provided a geotechnical engineering report including geotechnical evaluations and recommendations regarding permanent cut and fill slopes, excavations, groundwater control, pavement design considerations, and on-site suitability. Completed on time and within budget.
d.
(1) TITLE AND LOCATION (City and State)
Biscayne National Park,
Convoy Point/Adams Key, Biscayne Keys, Florida
(2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Krishnasamy was the Principal-in-Charge of the Geotechnical Engineering Study for the Biscayne National Park located in the Biscayne Keys, Florida. The project consists of design repairs and replacements that address the hurricane impact damage caused by Hurricane Irma and Maria. The study was performed to obtain information on the existing subsurface conditions within the site improvements to assist in the design and preparation of construction plans. Provided a geotechnical engineering report including the results of the subsurface exploration. Completed on time and within budget.
e.
(1) TITLE AND LOCATION (City and State)
Vista Verde Phase 4, Roadway and Drainage Improvement,
City of Miami Gardens, Florida.
(2) YEAR COMPLETED PROFESSIONAL SERVICES 2020
CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Krishnasamy was the Principal-in-Charge of the Geotechnical Engineering Services for the Vista Verde Phase 4 located in the City of Miami Gardens, Florida. The project consists of roadway and drainage improvements, and pavement design. The purpose of this study was to explore the subsurface conditions at the site to enable an evaluation of acceptable construction and site development considerations. Provided a geotechnical engineering report including geotechnical evaluation and recommendations regarding excavations, trench backfill, and preconstruction conditions survey. Completed on time and within budget.
191
STANDARD FORM 330 (REV. 8/2016)
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME
Kumar Vedula, P.E.
13. ROLE IN THIS CONTRACT
Principal Geotechnical Engineer
14. YEARS EXPERIENCE
a. TOTAL
24
b. WITH CURRENT FIRM
14 15. FIRM NAME AND LOCATION (City and State) TIERRA SOUTH FLORIDA, INC. (TSF) West Palm Beach, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) Bachelor of Engineering, Andhra University, India, 1992 MS Civil Engineering, University of Memphis, 1995
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Engineer, Florida No. 54873
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Augered Cast-in-Place and Driven Pre-stressed Concrete Pile Field Performance Comparison, Frizzi, R. P, & Vedula, R.V, Published in FHWA Resource Center, 83rd Annual Transportation Research Board Meeting, Washington D.C., January 2004 19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
Biscayne National Park, Convoy Point/Adams Key,
Biscayne Keys, Florida
(2) YEAR COMPLETED PROFESSIONAL SERVICES 2020
CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Vedula was the Principal Geotechnical Engineer of the Geotechnical Engineering Study for the Biscayne National Park located in the Biscayne Keys, Florida. The project consists of design repairs and replacements that address the hurricane impact damage caused by Hurricane Irma and Maria. Provided a geotechnical engineering report including the results of the subsurface exploration.
b.
(1) TITLE AND LOCATION (City and State)
Prospect NE 10th Avenue Bridge,
Miami-Dade County, Florida
(2) YEAR COMPLETED PROFESSIONAL SERVICES 2020
CONSTRUCTION (If applicable)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Vedula was the Principal Geotechnical Engineer of the Geotechnical Engineering Services for the Prospect NE 10th Avenue Bridge located in Miami-Dade County, Florida. The bridge will be replaced with a wider typical section to accommodate increased pedestrian and vehicular traffic. Provided a preliminary geotechnical engineering report including engineering evaluations and preliminary recommendations regarding driven concrete pile axial capacity, drilled shaft axial capacity, construction considerations, and monitor existing structures. Completed on time and within budget.
c.
(1) TITLE AND LOCATION (City and State)
Vista Verde Phase 4, Roadway and Drainage Improvement,
City of Miami Gardens, Florida
(2) YEAR COMPLETED PROFESSIONAL SERVICES 2020
CONSTRUCTION (If applicable)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Vedula was the Principal Geotechnical Engineer of the Geotechnical Engineering Services for the Vista Verde Phase 4 located in the City of Miami Gardens, Florida. The project consists of roadway and drainage improvements, and pavement design. The purpose of this study was to explore the subsurface conditions at the site to enable an evaluation of acceptable construction and site development considerations. Provided a geotechnical engineering report including geotechnical evaluation and recommendations regarding excavations, trench backfill, and preconstruction conditions survey. Completed on time and within budget.
d.
(1) TITLE AND LOCATION (City and State)
SW 42 Street (Bird Road Extension) From SW 162 Avenue to SW 157
Avenue, Miami-Dade County, Florida
(2) YEAR COMPLETED PROFESSIONAL SERVICES 2020
CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Vedula was the Geotechnical Principle Engineer of the Geotechnical Engineering Services for the widening project of Bird Road Extension from SW 162nd Ave to SW 15th Avenue in Miami-Dade County. The roadway limits are approximately 3,100 lineal feet in length. Provided a geotechnical engineering report including geotechnical evaluations and recommendations regarding permanent cut and fill slopes, excavations, groundwater control, pavement design considerations, and on-site suitability. Completed on time and within budget.
e.
(1) TITLE AND LOCATION (City and State)
NW 107th Ave from 58th to NW 74th St.,
Doral, Florida
(2) YEAR COMPLETED PROFESSIONAL SERVICES 2020
CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Vedula was the Principal Geotechnical Engineer of the Geotechnical Engineering Services for the for NW 107th Avenue from 58th Northwest 74th Street located in Doral, Florida. Provided a geotechnical engineering report including the results of field testing for consideration of potential issues regarding subsidence. Completed on time and within budget.
192
STANDARD FORM 330 (REV. 8/2016)
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME
Francois Thomas, P.E.
13. ROLE IN THIS CONTRACT
Principal Engineer, Special Inspector
14. YEARS EXPERIENCE
a. TOTAL
27
b. WITH CURRENT FIRM
18 15. FIRM NAME AND LOCATION (City and State) TIERRA SOUTH FLORIDA, INC. (TSF) West Palm Beach, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) MS in Geotechnical Engineering, 1993; BS in Civil Engineering, 1991
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Engineer, Florida No. 56381 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Special Inspector 7021399, Certified Masonry Inspector, Radiation Safety Officer 19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
Gateway Park Pedestrian Bridge,
City of Sunny Isles Beach, Florida
(2) YEAR COMPLETED PROFESSIONAL SERVICES 2014
CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Thomas was the Principal Engineer of the Geotechnical Engineering Services for the Gateway Park Pedestrian Bridge located in The City of Sunny Isles, Florida. The project consists of the construction of a new pedestrian bridge over State Road No. 826 Westbound. The purpose of this study was to explore the subsurface conditions within or in close proximity to the pedestrian bridge to enable an evaluation of foundations for the construction. TSF’s geotechnical field study included SPT borings. Provided a geotechnical engineering report including geotechnical evaluations and recommendations regarding foundation, bridge, pile monitoring and construction considerations regarding excavations. Completed on time and within budget.
b.
(1) TITLE AND LOCATION (City and State)
Samson Oceanfront Park,
City of Sunny Isles Beach, Florida
(2) YEAR COMPLETED PROFESSIONAL SERVICES 2016
CONSTRUCTION (If applicable)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Thomas was the Principal Engineer of the Auger-Cast Pile Inspection and Construction Material Testing Services for the Samson Oceanfront Park located in the City of Sunny Isles Beach, Florida. The project consists of a compact beach park with a playground, pavilion and showers. A TSF Senior Engineer provided review of daily reports, handled project coordination and attended meetings as necessary. Completed on within budget.
c.
(1) TITLE AND LOCATION (City and State)
Cultural Pavilion at Triangle Park,
City of Doral, Florida
(2) YEAR COMPLETED PROFESSIONAL SERVICES 2019
CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Thomas was the Principal Engineer of the Geotechnical Engineering Study for the Cultural Pavilion at Triangle Park. The project consists of a single-story cultural pavilion encompassing an area of approximately 9,200 square feet, walkways and associated site work. The purpose of this study was to explore the subsurface conditions at the site to enable an evaluation of acceptable foundation and pavement systems for the construction. Provided a geotechnical engineering report including geotechnical recommendations regarding, site preparation, foundations, floor slab, utilities, and construction considerations regarding excavations. Completed on time and within budget.
d.
(1) TITLE AND LOCATION (City and State)
Miami-Dade Transfer Station Conceptual Study,
Homestead, Florida.
(2) YEAR COMPLETED PROFESSIONAL SERVICES 2020
CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Thomas was the Principal Engineer of the Geotechnical Engineering Study for the Miami-Dade Transfer Station located in Homestead, Florida. The project consists of a single-story Transfer Station Building, with wall heights in excess of 45 feet. The purpose of this study was to explore the subsurface conditions at the site to enable a preliminary evaluation of an acceptable foundation for the construction. Provided a geotechnical engineering report including geotechnical evaluations and preliminary discussions regarding floor slab and utilities. Completed on time and within budget.
e.
(1) TITLE AND LOCATION (City and State)
Vista Verde Phase 4, Roadway and Drainage Improvement,
City of Miami Gardens, Florida
(2) YEAR COMPLETED PROFESSIONAL SERVICES 2020
CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Thomas was the Principal Engineer of the Geotechnical Engineering Services for the Vista Verde Phase 4 located in the City of Miami Gardens, Florida. The project consists of roadway and drainage improvements, and pavement design. The purpose of this study was to explore the subsurface conditions at the site to enable an evaluation of acceptable construction and site development considerations. Provided a geotechnical engineering report including geotechnical evaluation and recommendations regarding excavations, trench backfill, and preconstruction conditions survey. Completed on time and within budget.
193
STANDARD FORM 330 (REV. 8/2016)
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY
NUMBER
1
21. TITLE AND LOCATION (City and State)
Gateway Park Pedestrian Bridge,
City of Sunny Isles Beach, Florida.
22. YEAR COMPLETED PROFESSIONAL SERVICES
2014
CONSTRUCTION (If applicable)
23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER City of Sunny Isles Beach c/o RJ Behar & Company, Inc.
b. POINT OF CONTACT NAME Mr. Juan Vazquez
c. POINT OF CONTACT TELEPHONE NUMBER (954) 680-7771
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
TSF provided Geotechnical Engineering Services for the Gateway Park Pedestrian Bridge located in The City of Sunny Isles, Florida.
The project consists of the construction of a new pedestrian bridge over State Road No. 826 Westbound. The purpose of this study was to explore the subsurface conditions within or in close proximity to the pedestrian bridge to enable an evaluation of foundations for the construction.
TSF’s geotechnical field study included SPT borings.
Provided a geotechnical engineering report including geotechnical evaluations and recommendations regarding foundation, bridge, pile monitoring and construction considerations regarding excavations.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME TSF
(2) FIRM LOCATION (City and State) West Palm Beach, FL
(3) ROLE Geotechnical Engineering Services
194
STANDARD FORM 330 (REV. 8/2016)
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY
NUMBER
2
21. TITLE AND LOCATION (City and State)
Biscayne National Park,
Convoy Point/Adams Key, Biscayne Keys, Florida.
22. YEAR COMPLETED PROFESSIONAL SERVICES
2020
CONSTRUCTION (If applicable)
23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER Miami-Dade County Parks, Recreation and Open Spaces c/o Jacobs
b. POINT OF CONTACT NAME Ms. Rita Donnell
c. POINT OF CONTACT TELEPHONE NUMBER (720) 286-1572
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
TSF performed a Geotechnical Engineering Study for the Biscayne National Park located in the Biscayne Keys, Florida.
The project consists of design repairs and replacements that address the hurricane impact damage caused by Hurricane Irma and Maria.
The study was performed to obtain information on the existing subsurface conditions within the site improvements to assist in the design and preparation of construction plans.
TSF’s geotechnical field study included SPT borings; Classified soil samples in the laboratory using the Unified Soil Classification System.
Provided a geotechnical engineering report including the results of the subsurface exploration.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME TSF
(2) FIRM LOCATION (City and State) West Palm Beach, FL
(3) ROLE Geotechnical Engineering Services
195
STANDARD FORM 330 (REV. 8/2016)
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY
NUMBER
3
21. TITLE AND LOCATION (City and State)
Vista Verde Phase 4, Roadway and Drainage Improvement,
City of Miami Gardens, Florida
22. YEAR COMPLETED PROFESSIONAL SERVICES
2020
CONSTRUCTION (If applicable)
23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER City of Miami Gardens c/o Craven Thompson & Associates, Inc.
b. POINT OF CONTACT NAME Mr. Gary Tenn
c. POINT OF CONTACT TELEPHONE NUMBER (954)-739-6400 x306
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
TSF provided Geotechnical Engineering Services for the Vista Verde Phase 4 located in the City of Miami Gardens, Florida.
The project consists of roadway and drainage improvements, and pavement design. The purpose of this study was to explore the subsurface conditions at the site to enable an evaluation of acceptable construction and site development considerations.
TSF’s geotechnical field study included auger borings, pavement cores and borehole permeability tests. Provided a geotechnical engineering report including geotechnical evaluation and recommendations regarding excavations, trench backfill, and preconstruction conditions survey.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME TSF
(2) FIRM LOCATION (City and State) West Palm Beach, FL
(3) ROLE Geotechnical Engineering Services
196
STANDARD FORM 330 (REV. 8/2016)
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY
NUMBER
4
21. TITLE AND LOCATION (City and State)
Wastewater Pump Station Improvements / Hispanola Ave at Mutiny Ave and
Galleon St at E Treasure Dr, North Bay Village, Florida
22. YEAR COMPLETED PROFESSIONAL SERVICES
2019
CONSTRUCTION (If applicable)
23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER Miami-Dade County c/o Kimley-Horn
b. POINT OF CONTACT NAME Ms. Marissa Maring, P.E.
c. POINT OF CONTACT TELEPHONE NUMBER / EMAIL (954) 535 5137
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
TSF performed a Geotechnical Engineering Study for the North Bay Village Lift Stations located in North Bay Village, Florida.
The project consists of a Lift Stations in the intersection of Hispanola Avenue and Mutiny Avenue and in the intersection of Galleon Street and E Treasure Drive.
TSF’s geotechnical field study included SPT borings.
Provided a geotechnical engineering report including geotechnical evaluations and recommendations regarding foundations, wet wall foundations, valve vault foundations, utilities, excavations and dewatering, lateral Earth Pressures, and preconstruction conditions survey.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME TSF
(2) FIRM LOCATION (City and State) West Palm Beach, FL
(3) ROLE Geotechnical Engineering Services
197
STANDARD FORM 330 (REV. 8/2016)
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY
NUMBER
5
21. TITLE AND LOCATION (City and State)
SW 42 Street (Bird Road Extension) From SW 162 Avenue to SW 157 Avenue,
Miami-Dade County, Florida
22. YEAR COMPLETED PROFESSIONAL SERVICES
2019
CONSTRUCTION (If applicable)
23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER Miami- Dade Public Works and Waste Management c/o David Plummer & Associates, Inc.
b. POINT OF CONTACT NAME Mr. Victor Lee
c. POINT OF CONTACT TELEPHONE NUMBER (305)-447-0900
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
TSF provided Geotechnical Engineering Services for the widening project of Bird Road Extension from SW 162nd Ave to SW 15th Avenue in Miami-Dade County.
The roadway limits are approximately 3,100 lineal feet in length. The study was performed to obtain information on the existing subsurface conditions along the project alignment to assist in the design and preparation of construction plans for improvements.
TSF’s geotechnical field study included SPT borings.
Provided a geotechnical engineering report including geotechnical evaluations and recommendations regarding permanent cut and fill slopes, excavations, groundwater control, pavement design considerations, and on-site suitability.
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME TSF
(2) FIRM LOCATION (City and State) West Palm Beach, FL
(3) ROLE Geotechnical Engineering Services
198
STANDARD FORM 330 (REV. 8/2016)
G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS
26. NAMES OF KEY
PERSONNEL
(From Section E,
Block 12)
27. ROLE IN THIS
CONTRACT
(From Section E,
Block 13)
28. EXAMPLE PROJECTS LISTED IN SECTION F
(Fill in "Example Projects Key" section below before completing
table. Place "X" under project key number for
participation in same or similar role.)
1 2 3 4 5 6 7 8 9 10 Raj Krishnasamy, P.E. Principal-in-Charge, Principal Engineer
X X X X X
Kumar Vedula, P.E. Principal Engineer X X X X Francois Thomas, PE Principal Engineer X X X X X
29. EXAMPLE PROJECTS KEY
NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F)
1 Gateway Park Pedestrian Bridge,
City of Sunny Isles Beach, Florida 6
2 Biscayne National Park,
Convoy Point/Adams Key, Biscayne Keys, Florida 7
3 Vista Verde Phase 4, Roadway and Drainage
Improvement, City of Miami Gardens, Florida 8
4
Wastewater Pump Station Improvements / Hispanola Ave
at Mutiny Ave and Galleon St at E Treasure Dr, North Bay
Village, FL
9
5 SW 42 Street (Bird Road Extension) From SW 162 Avenue
to SW 157 Avenue, Miami-Dade County, Florida 10
199
200
201
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)202
(Complete this section for the prime contractor and all key subcontractors.)
STANDARD FORM 330
ARCHITECT - ENGINEER QUALIFICATIONS
PART I - CONTRACT-SPECIFIC QUALIFICATIONS
A. CONTRACT INFORMATION
B. ARCHITECT-ENGINEER POINT OF CONTACT
D. ORGANIZATIONAL CHART OF PROPOSED TEAM
C. PROPOSED TEAM
9. FIRM NAME
(Check)PRIMEJ-V PARTNERSUB-CONSULTANT11. ROLE IN THIS CONTRACT
1. TITLE AND LOCATION (City and State)
2. PUBLIC NOTICE DATE
4. NAME AND TITLE
5. NAME OF FIRM
6. TELEPHONE NUMBER 7. FAX NUMBER 8. E-MAIL ADDRESS
3. SOLICITATION OR PROJECT NUMBER
CHECK IF BRANCH OFFICE
CHECK IF BRANCH OFFICE
CHECK IF BRANCH OFFICE
CHECK IF BRANCH OFFICE
CHECK IF BRANCH OFFICE
CHECK IF BRANCH OFFICE
(ATTACHED)
10. ADDRESS
a.
b.
c.
d.
e.
f.
STANDARD FORM 330 (REV. 8/2016) - SF330-A ThRu C_uSuPAE
Continuing Professional Consulting Services (CCNA)
July 8, 2020
Charles “Chuck” R. Faust, Jr.
uS utility Potholing & Air Excavation
954.937.1488 954.921.1149 CFaust@uSutilityPotholing.com
20-07-01
Managing Member
Calvin, Giordano &
Associates, Inc.X
1800 Eller Drive, Suite 600
Fort Lauderdale, FL 33316
PRIME CONSuLTANT:
Landscape Architecture, Urban Design, Planning,
Environmental Services, Civil Engineering, Traffic
Engineering, Surveying
uS utility Potholing & Air
Excavation (uSuPAE)X
4630 NE 11th Avenue
Oakland Park, FL 33334
SuB-CONSuLTANT:
Utility Designation / Utility Potholing SUE
203
c.
d.
e.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete One Section E for Each Key Person.)
12. NAME
16. EDUCATION (Degree and Specialization)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
15. FIRM NAME AND LOCATION (City and State)
13. ROLE IN THIS CONTRACT
a. TOTAL b. WITH CURRENT FIRM
14. YEARS OF EXPERIENCE
19. RELEVANT PROJECTS
a.
b.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 ChARleS FAuST
CHARLES “CHUCK” R. FAUST JR.
uS utility Potholing & Air excavation
high School Diploma N/A
Oakland Park, FL
Utility Locating Certificate
ACCOUNT MANAGEMENT 5 5
14-7216.2 Nova Drive Improvements
Davie, Florida
Collected SUE Data for the purpose of verifying underground utilities horizontal and vertical locations for Nova Dr widening. Our cost $
34,110.00
2017 N/A
FDOT I-95 expressway
Broward County, Florida
Collected SUE Data for the purpose of verifying utility locations for future foundations of widening I-95 in Broward County. Our cost
$18,970.00.
2016 N/A
Dania Beach Catch Basin 5
Dania Beach, Florida
Collected SUE Data for engineering design purposes for Calvin Giordano & Associates our cost $11,955.00.
2015 N/A
Mount Sinai hospital
Miami Beach, Florida
Collected SUE Data for design purposes for Kimley-Horn Engineering for raising structures and new construction at Mount Sinai Hospital
in Miami our cost $17,855.00
2015 N/A
FDOT 826 / I-75 expressway lanes
Florida
Collected SUE Data for the purposes of verifying locations of underground utilities for placement of mast arm bases. This is an ongoing
contract as needed.
2016 N/A
204
c.
d.
e.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete One Section E for Each Key Person.)
12. NAME
16. EDUCATION (Degree and Specialization)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
15. FIRM NAME AND LOCATION (City and State)
13. ROLE IN THIS CONTRACT
a. TOTAL b. WITH CURRENT FIRM
14. YEARS OF EXPERIENCE
19. RELEVANT PROJECTS
a.
b.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330JuAN RiveRA
JUAN RIVERA
uS utility Potholing & Air excavation
High School McArthur N/A
McFatter Technical institute - Davie, Florida
Oakland Park, FL
Hollywood, Florida
OSHA 10 Hour
Large Diameter Pipe Cleaning & Flagging Certificate
SUE TECHNICIAN 2 2
uS utility Potholing & Air excavation
Oakland Park, Florida
SUE Technician: Expose utilities, Vack / Component fill, potholing, catch basin cleaning, storm drain cleaning.
06/2018-Ongoing
205
c.
d.
e.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete One Section E for Each Key Person.)
12. NAME
16. EDUCATION (Degree and Specialization)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
15. FIRM NAME AND LOCATION (City and State)
13. ROLE IN THIS CONTRACT
a. TOTAL b. WITH CURRENT FIRM
14. YEARS OF EXPERIENCE
19. RELEVANT PROJECTS
a.
b.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 MARviN PARkiNS
MARVIN PARKINS
US Utility Potholing & Air Excavation
knockalya High School, Jamaica N/A
Oakland Park, FL
June 2003
Permit to work within 20 - 25 feet of train tracks.
MOT certified.
Licensed contract for schools in Broward and Miami-Dade.
SUE TECHNICIAN 10 <1
US Utility Potholing & Air Excavation
Oakland Park, Florida
SUE Technician: Utility Locator, identifying and labeling public utility mains that are underground.
06/2020-Ongoing
Cardno TBE
Fort Lauderdale, Florida
SUE Technician: Worked as main lead on Vac truck, completing soft digs and designating. Also FDOT qualified.
11/2010-09/2014
keith and Associates, inc.
Fort Lauderdale, Florida
Designator: Experienced underground utility locator using equipment such as GPR-GSSI, RD 8000 and VIVAX utility scanner. Provided
thorough sketches after designating was complete. MOT certified. Main lead on vac truck in soft digs. Able to take lead initiative.
Excellent problem solving skills in locating underground utilities.
11/2014-03/2018
infraMap
West Palm Beach, Florida
Designator: Lead designator in field. Used GPR, RD 8100,VIVAX and A10 to locate underground utilities. Provided detail sketches to
clients of designated area. Able to proficiently set up MOT.
04/2018-05/2020
206
c.
d.
e.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete One Section E for Each Key Person.)
12. NAME
16. EDUCATION (Degree and Specialization)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
15. FIRM NAME AND LOCATION (City and State)
13. ROLE IN THIS CONTRACT
a. TOTAL b. WITH CURRENT FIRM
14. YEARS OF EXPERIENCE
19. RELEVANT PROJECTS
a.
b.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firm
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firm
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firm
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firm
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 Mike MuRphy
MICHAEL MURPHY
uS utility potholing & Air excavation
Associates Degree N/A
Oakland Park, FL
Broward College, Fort Lauderdale, FL
SUE TECH I 3 months 3 months
uS utilty potholing and Air excavation
Oakland Park, Florida
SUE 1 - Vac truck labor. Expose utilities, vack / compound fill, potholing, catch basin cleaning.
03/2020 N/A
207
c.
d.
e.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete One Section E for Each Key Person.)
12. NAME
16. EDUCATION (Degree and Specialization)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
15. FIRM NAME AND LOCATION (City and State)
13. ROLE IN THIS CONTRACT
a. TOTAL b. WITH CURRENT FIRM
14. YEARS OF EXPERIENCE
19. RELEVANT PROJECTS
a.
b.
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firm
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firm
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
(1) TITLE AND LOCATION (City and State)
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
Check if project performed with current firmX
STANDARD FORM 330 (REV. 8/2016) - SF330 AAgje MONTeleONe
AAGIE MONTELEONE
US Utility Potholing & Air excavation
Associates Degree Hospitality N/A
Oakland Park, FL
Palm Beach Community College, Palm Beach, FL
OFFICE ADVISORY 20+1+
US Utilty Potholing and Air excavation
Oakland Park, Florida
Office Manager - Complete construction reports, follow up with any pending issues/concerns, handle invoices/accounting. Make sure
any plans are approved and ready to go. Create tickets for any jobs. Organize files, jobs and customer services emails.
2018 N/A
Surf Industry Brands
Customer Service Associate
Office Manager - Managed the office dealing with order entry, problem solving with orders, billing, ect. Organized trade shows and
appointments .
2008-2018 N/A
embassy Suites by Hilton Deerfiled Beach Resort
Deerfield Beach, Florida
Front Office Manager
1997-2008 N/A
208
20. EXAMPLE PROJECT
KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
22. YEAR COMPLETED
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
a.
b.
c.
d.
e.
STANDARD FORM 330 (REV. 8/2016) - SF330-F - USUPAE_PROjEcTS
2016 N/A
01
cOMMUNITY, cONDOTTE, DE MOYA
US Utility Potholing & Air Excavation Oakland Park, FL Subsurface Utility Engineering
FDOT 826 / I-75 Expressway Lanes
Antonio Diaz 786.543.7166
Florida
US Utility Potholing & Air Excavation was requested to locate mark and physically
verify existing utilities that may be of conflict with proposed mast arms. We verified
the utilities with the use of vacuum excavation methods and depths measured with
grade rod. Our crews collected data and marked with either PK Nails and Paint or
Stake and Feather for the survey crews to shoot.
This is an ongoing contract and work as needed by client.
209
20. EXAMPLE PROJECT
KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
22. YEAR COMPLETED
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
a.
b.
c.
d.
e.
STANDARD FORM 330 (REV. 8/2016) - SF330-F - USUPAE_PROjEcTS
2016 N/A
02
FDOT
US Utility Potholing & Air Excavation Oakland Park, FL Subsurface Utility Engineering
FDOT I-95 Expressway
Abraham Hadad 305.207.6845
Broward County, Florida
US Utility Potholing & Air Excavation was responsible for collecting SUE Data to
aid in the design and installation for future foundations for the widening of I-95
Expressway. We were requested to locate mark and physically verify existing
utilities that may be in conflict with proposed foundations on the widening of I-95
Expressway Overpasses. Requested utilities were verified with the use of vacuum
excavation methods and depths measured with grade rod. Our crews collected data
and marked with either PK Nails and Paint or Stake and Feather along with providing
the Surveying Firm of Hadonne a detailed report of utilities located.
Cost of our services on this project were $18,970.00
210
20. EXAMPLE PROJECT
KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
22. YEAR COMPLETED
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
a.
b.
c.
d.
e.
STANDARD FORM 330 (REV. 8/2016) - SF330-F - USUPAE_PROjEcTS
N/A N/A
03
cITY OF DANIA BEAcH
US Utility Potholing & Air Excavation Oakland Park, FL Subsurface Utility Engineering
Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Prime: Engineering Design
Dania Beach catch Basin 5
james Messick, PE 954.766.2789
Dania Beach, Florida
Calvin, Giordano & Associates, Inc. - Project Manager
We were asked by client to collect SUE Data on potential conflicts of existing utilities
for the design of Catch Basins in Dania Beach, FL. We located, measured depth and
size of existing utilities by the use of standard utility locating methods, GPR and
Vacuum Excavation methods. We then compiled the data into a detailed SUE Report
along with marking on pavement or grass with PK Nails, Paint or Stake/ Feathers for
future survey.
211
20. EXAMPLE PROJECT
KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
22. YEAR COMPLETED
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
a.
b.
c.
d.
e.
STANDARD FORM 330 (REV. 8/2016) - SF330-F - USUPAE_PROjEcTS
N/A N/A
04
BROWARD cOUNTY
US Utility Potholing & Air Excavation Oakland Park, FL Subsurface Utility Engineering
Calvin, Giordano & Associates, Inc.Fort Lauderdale, FL Engineering
14-7216.2 Nova Drive Improvements
jenna Martinetti, PE 954.921.7781
Davie, Florida
Calvin, Giordano & Associates, Inc. - Project Manager
Verification of existing utilities for street widening on Nova Dr and also clearing
utilities for future mast arms.
Total cost of our services $34,110.00
212
20. EXAMPLE PROJECT
KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
22. YEAR COMPLETED
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
a.
b.
c.
d.
e.
STANDARD FORM 330 (REV. 8/2016) - SF330-F - USUPAE_PROjEcTS
N/A N/A
05
FLORIDA INTERNATIONAL UNIVERSITY
US Utility Potholing & Air Excavation Oakland Park, FL Subsurface Utility Engineering
FIU Miami campus
Marty Rossi 954.436.7000
Miami, Florida
Miller Legg - Project Manager
Provided utility verification on specific utilities that client had designated to aid in
design purposes.
Our fees on this project were $4310.00.
213
20. EXAMPLE PROJECT
KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
22. YEAR COMPLETED
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
a.
b.
c.
d.
e.
STANDARD FORM 330 (REV. 8/2016) - SF330-F - USUPAE_PROjEcTS
N/A N/A
06
cVS
US Utility Potholing & Air Excavation Oakland Park, FL Subsurface Utility Engineering
cVS #74943
john Hillman 561.404.7238
Florida
Kimley-Horn - Project Manager
Client asked us to go to new site of CVS to locate and verify existing utilities to aid
in the design of new CVS Store location. We located utilities through standard utility
locating methods and GPR and verification was performed with the use of Vacuum
Excavation.
Total cost of our services on this project was $2,975.00.
214
20. EXAMPLE PROJECT
KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
22. YEAR COMPLETED
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
a.
b.
c.
d.
e.
STANDARD FORM 330 (REV. 8/2016) - SF330-F - USUPAE_PROjEcTS
N/A N/A
07
FDOT
US Utility Potholing & Air Excavation Oakland Park, FL Subsurface Utility Engineering
Utility Locate / Verification
craig Fusaro 727.479.6338
Bal Harbor, Florida
GeoView - Project Manager
This was a small project to locate using air vacuum excavation methods existing
utilities in the area where a new mast arm would be installed for a traffic light. We
were hired by the utility locating company GeoView.
Project Cost $1,000.00
215
20. EXAMPLE PROJECT
KEY NUMBERF. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
22. YEAR COMPLETED
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
b. POINT OF CONTACT NAME (at time of contract)c. POINT OF CONTACT TELEPHONE NUMBER
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
a.
b.
c.
d.
e.
STANDARD FORM 330 (REV. 8/2016) - SF330-F - USUPAE_PROjEcTS
N/A N/A
08
STATE cONTRAcTING & ENGINEERING
US Utility Potholing & Air Excavation Oakland Park, FL Subsurface Utility Engineering
Pine Avenue Drain Improvements
Paul carty 954.931.3857
Lauderdale-by-the-Sea, Florida
To verify and mark the elevation of existing utilities with the use of Air Vacuum
Excavation methods. Utilities were all marked using paint.
216
G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS
26. NAMES OF KEY
PERSONNEL
(From Section E,
Block 12)
29. EXAMPLE PROJECTS KEY
NO.
1
2
3
4
5
NO.
6
7
8
9
10
TITLE OF EXAMPLE PROJECT (From Section F)TITLE OF EXAMPLE PROJECT (From Section F)
27. ROLE IN THIS
CONTRACT
(From Section E,
Block 13)
28. EXAMPLE PROJECTS LISTED IN SECTION F
(Fill in “Example Projects Key” section below before completing
table. Place “X” under project key number for
participation in same or similar role.)
1 2 3 4 5 6 7 8 9 10
STANDARD FORM 330 (REV. 8/2016) - SF330-G_USUPAE
XAccount Management/Field
WorkCharles R. Faust Jr.X X X X X X X
SUE TechnicianJuan Rivera X X X
SUE TechnicianMarvin Parkins
SUE Technician IMichael Murphy
Aagie Monteleone
FDOT 826 / I-75 Expressway Lanes CVS #74943
FDOT I-95 Expressway Utility Locate / Verification
Dania Beach Catch Basin 5 Pine Avenue Drain Improvements
14-7216.2 Nova Drive Improvements
FIU Miami Campus
217
H. ADDITIONAL INFORMATION
I. AUTHORIZED REPRESENTATIVE
The forgoing is a statement of facts.
STANDARD FORM 330 (REV. 8/2016) - SF330-H_USUPAE
30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED.
31. SIGNATURE
33. NAME AND TITLE
32. DATE
Charles R. Faust Jr.Managing Member
06.05.2020
218
ARCHITECT - ENGINEER QUALIFICATIONS
PART II - GENERAL QUALIFICATIONS
(If a firm has branch offices, complete for each specific branch office seeking work.)
3. YEAR ESTABLISHED
a. TYPE
b. SMALL BUSINESS STATUS
7. NAME OF FIRM (If Block 2a is a Branch Office)
6b. TELEPHONE NUMBER
Other Employees
a. Federal Work
a. SIGNATURE b.DATE
c. NAME AND TITLE
11. ANNUAL AVERAGE PROFESSIONAL
SERVICES REVENUES OF FIRM
FOR LAST 3 YEARS
(Insert revenue index number shown at right)
12. AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts.
PROFESSIONAL SERVICES REVENUE INDEX NUMBER
1. Less than $100,000
2. $100,000 to less than $250,000
3. $250,000 to less than $500,000
4. $500,000 to less than $1 million
5. $1 million to less than $2 million
6. $2 million to less than $5 million
7. $3 million to less than $10 million
8. $10 million to less than $25 million
9. $25 million to less than $50 million
10. $50 million or greater
b. Non-Federal Work
c. Total Work
Total
6a. POINT OF CONTACT NAME AND TITLE
2c. CITY
2b. STREET
2a. FIRM (or Branch OFfice) NAME
2d. STATE 2e. ZIP CODE
6c. E-MAIL ADDRESS
4. UNIQUE ENTITY IDENTIFIER
5. OWNERSHIP
8b. YEAR ESTABLISHED8a. FORMER FIRM NAME(S) (If any)
10. PROFILE OF FIRM’S EXPERIENCE
AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS9. EMPLOYEES DISCIPLINE
a. Function
Code b. Discipline
a. Profile
Code
c. Number of Employees
(1) FIRM (2) BRANCH
c. Revenue Index
Number
(see below)
b. Experience
8c. UNIQUE ENTITY IDENTIFIER
STANDARD FORM 330 (REV. 8/2016) - SF330-PART II_USUPAE
2014
CORPORATION
BROWARD COUNTY SMALL BUSINESS
FLORIDA
US UTILITY POTHOLING & AIR EXCAVATION
4630 NE 11TH AVENUE
OAKLAND PARK 33334
85-9310166
954.937.1488
02 1 25AdministrativeConstruction Management
20Cost Estimating
0
8
8
CFaust@USUtilityPotholing.com
CHARLES R. FAUST JR.MANAGING MEMBER
June 5, 2020
CHUCK FAUST
MANAGING MEMBER
1. SOLICITATION NUMBER (If any)
20-07-01
219
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)220
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)221
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)222
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)223
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)224
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)225
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)226
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)227
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)228
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)
10066306-AP-BD+C
CREDENTIAL ID
30 MAR 2010
ISSUED
27 MAR 2022
VALID THROUGH
GREEN BUSINESS CERTIFICATION INC. CERTIFIES THAT
Tammy Cook-
Weedon
HAS ATTAINED THE DESIGNATION OF
LEED AP® Building Design
+ Construction
by demonstrating the knowledge and understanding of green building practices and principles needed to support the use of the LEED® green building program.
MAHESH RAMANUJAM PRESIDENT & CEO, U.S. GREEN BUILDING COUNCILPRESIDENT & CEO, GREEN BUSINESS CERTIFICATION INC.
229
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)230
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)231
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)232
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)233
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)234
TAB F
firm references and similar work
completed
City of Sunny Isles Beach - North Bay Road Pedestrian Bridge
235
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)
Tab F - Firm References and Similar Work Completed
CGA has an extensive amount of experience spanning over 50 years with similar scope of work as outlined in this RFQ.
Town of Davie Professional Services (Ongoing)
6591 Orange Drive
Davie, Florida 33314
Point of Contact:
Jonathan Vogt
Town Engineer
Phone Number:
954.797.1137
Email Address:
Jonathan_Vogt@davie-fl.gov
CGA has provided continuing professional services to the
Town of Davie since 2008. Services include:
Roadway, Traffic and Transportation Engineering services
including roadway design, signal design, maintenance of
traffic "M.O.T.", traffic studies, second order storm drainage
improvements, inspections, underground utility upgrades
and other services as needed.
Land Development, Civil-Site and Drainage Systems;
engineering services for site developments projects to include
planning, civil site and drainage improvements, preparation
of construction documents, budgeting, approval, permitting,
bidding, construction, final project closeout upgrades and
other services as needed.
Architectural Landscape; architectural services for the
enhancement of areas which can include landscape design
of parks, greenways and recreational facilities, pedestrian
and bicycle networks, signage, general beautification projects
and other services as needed.
Surveying and Utility Locates; technical services to develop
topographic and boundary plans, locate underground utilities,
perform exploratory borings, generate location maps, collect
GIS data and other services as needed.
Construction Inspection; technical services for on-site
construction inspection, certify construction to technical
specifications, monitor project schedule, review pay
applications, support project management activities and
other services as needed. Includes Construction Engineering
Inspection work for FDOT.
Projects completed for the Town include:
• Master Lift Station #8
• Davie Road Improvements Phase I and II
• College Avenue Improvements Phase I and II
• Nova Drive Improvements
• Bamford Park Artificial Turf Conversion
• System III 30" Overhead Pipe Replacement
• Lift Station #9 Rehabilitation
• Lift Station #18 Rehabilitation
• Generator Replacement - WTP/WWTP - System II/III
• WTP Improvement
236
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)
Engineering Services (Ongoing)
655-96th Street
Bal Harbour, Florida 33154
Point of Contact:
Mike Alvarez, CGC, PWLF
Utility Compliance Officer
Phone Number:
786.566.3562
Email Address:
MAlvarez@balharbourfl.gov
CGA has provided continuing professional services to the
Bal Harbour Village since 2017. Services include:
Calvin, Giordano & Associates, Inc. (CGA) began providing
professional services to Bal Harbour Village in 2017. Currently,
CGA has a Continuing Engineering Services Agreement with
Bal Harbour Village in order to assist the Village in various
design projects and plan review services. These services
include Civil Engineering, Electrical Engineering, Surveying,
GIS, and Construction Services.
On-going services for Bal Harbour Village:
• Building Department Public Works Plan Review and
Utilities Plan Review
• Sunshine 811 Services – Manage Dig Tickets and
Design Ticket Response
• Florida Department of Environmental Protection
– NPDES Annual Reporting, MDC MS4 TMDL
Prioritization Plan and Assessment Plan
• Miami-Dade County Department of Regulatory and
Economic Resources Reporting – Sanitary Sewer
System Modeling and Water Usage Reporting
• GIS Database Verification and Updates – Water,
Sewer, Drainage, and Site Lighting
• Current Design / Construction Projects
• P.S. No. 1 Drainage Improvements – Project
Management, Bidding, Engineering During
Construction, and Construction Services
• Phase-3(a) Infrastructure Improvements – Project
Management, Civil Engineering Design, Bidding,
Engineering During Construction, and Construction
Services
• Phase-2(b) Water Main Replacement – Project
Management, Exploratory Investigation via
Geotechnical Engineering and Subsurface
Underground Exploratory
• Park Dr. 16” WM Abandonment and Replacement
Review – QA/QC of the design plans, Construction
Services.
237
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)
City of Miami Gardens Professional Services (Ongoing)
18605 NW 27th Avenue
Miami, Florida 33056
Point of Contact:
Cameron Benson
City Manager
Phone Number:
305.622.8001
Email Address:
CBenson@miamigardens-fl.gov
CGA has provided continuing professional services to the
City of Miami Gardens since 2013. Services include:
• Civil Engineering
• Environmental
• Planning General
• Construction Engineering Inspections (CEI)
• Surveying
• Landscape Architecture
• GIS Services
Projects Completed for the City Includes:
• Rolling Oaks Park Pedestrian Trail
• Bank of America Traffic Reviews
• GIS Mapping
• Sign Code Rewrite
• Hard Rock Stadium Pedestrian Bridges and Tunnels
• NW 27th Avenue Corridor Beautification Project
• NW 183rd Street - Phase II Beautification Project
• Vista Verde Community Park
• Parks Bond - Construction Management
238
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)
City of Miami Beach (Ongoing)
1700 Convention Center Drive
Miami Beach, Florida 33139
Point of Contact:
David Gomez
Senior Capital Project Coordinator
Phone Number:
305.673.6071 x 6732
Email Address:
DGomez@miamibeachfl.gov
CGA has provided continuing professional services to the
City of Miami Beach since 2004. Services include:
• Civil Engineering
• Environmental
• Planning General
• Construction Engineering Inspections (CEI)
• Surveying
• Landscape Architecture
• GIS Services
• Traffic Engineering
Projects Completed for the City Includes:
• Miami Beach North Shore Neighborhood
• Block Beach Walk Construction
• Electrical Power Distribution Design
• Flagler Monument Solar Lighting
• Miami Beach South Pointe Park – Pylon Lighting
• Middle Beach Recreational Corridor Phase II
• Middle Beach Recreational Corridor Phase III
• All-Wheels Park Design Studies
• North Shore Open Space Park
• Police Department Emergency System Bidding and
Construction Electrical ASA
• Flagler Memorial Monument lighting ASA Update
Electrical & Structural Plans
• Beach Walk II Phase II – CEI
• Middle Beach Phase III – Cultural Resources
Assessment Survey
• Police Department Roof Structural Analysis
• Resiliency Cod eConsultant Services
• Atlantic Way Width Redesign Modifications
• NBOP Arborist Reports
• Middle Beach Recreational Corridor Phase III –
Arborist Reports
• Police Department Electrical Assessment and
Upgrades
• Police Department Mechanical Plans for Generator
Upgrades
• Lummus Park/Indian Beach Park Survey – Middle
Beach Recreational Corridor Phase III
• Bay Drive Neighborhood Greenway
• Urban Forestry
239
TAB G
corporate standing and authorized
signatory
City of Sunny Isles Beach
240
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)
Tab G - Corporate Standing and Authorized Signatory
241
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)242
TAB H
forms and attachments
City of Sunny Isles Beach
243
City of Sunny Isles Beach |Request for Qualifications No. 20-07-01 33
DELIVER TO:
City of Sunny Isles Beach
City Clerk
18070 Collins Avenue
Sunny Isles Beach, FL 33160
REQUEST FOR
QUALIFICATIONS
SECTION 6
RESPONDENT SUBMITTAL
FORMS
OPENING: 2:30 P.M.
Tuesday, August 11,
2020
NOTE: City of Sunny Isles Beach is exempt from all taxes (Federal, State, and Local). Tax Exemption
Certificate furnished upon request.
Issued by: Purchasing Agent
Genesis Cuevas
Date Issued:
Wednesday, July 8,
2020
This Qualification Submittal
Consists of all required forms,
including SF330, Questionnaires,
Acknowledgements and Affidavits
Submissions are subject to the Terms and Conditions of this Request for Qualifications and the
accompanying Submittal. Such other contract provisions, specifications, drawings or other data as are
attached or incorporated by reference in the Submittal, will be received at the office of the City Clerk at the
address shown above until the above stated time and date, and at that time, publicly opened for furnishing
services described in the accompanying Submittal Requirement.
RFQ No. 20-07-01
Continuing Contract for Professional Services CCNA
Firm Name
________________________________________ Commodity Code(s):
RETURN ONE ORIGINAL AND FOUR COPIES OF QUALIFICATION SUBMITTAL PAGES AND
AFFIDAVITS
FAILURE TO SIGN PAGE 38 OF SECTION 6 QUALIFICATION SUBMITTAL WILL RENDER YOUR
SUBMISSION NON-RESPONSIVE
Calvin, Giordano & Associates, Inc.
N/A
244
City of Sunny Isles Beach |Request for Qualifications No. 20-07-01 34
6.1 ACKNOWLEDGEMENT FORM
NAME OF COMPANY:
___________________________________________
(Name of company submitting RFQ)
CHECK CATEGORY (CATEGORIES) YOU ARE APPLYING FOR:
1- ARCHITECTS __
2- CIVIL ENGINEERS__
3- ELECTRICAL ENGINEERS___
4- SURVEYORS AND MAPPING__
5- LEAK DETECTION STUDIES__
6- MECHANICAL, HVAC & PLUMBING ENGINEERS___
7 - GEOTECHNICAL___
8 – STRUCUTRAL ENGINEERS___
9 – ENVIRONMENTAL ENGINEERS____
10. CONSTRUCTION ENGINEERING AND INSPECTION (CEI) SERVICES____
Calvin, Giordano & Associates, Inc.
245
City of Sunny Isles Beach |Request for Qualifications No. 20-07-01 35
REQUIRED FORMS
PRIME FIRM
Role Name of Individual
Assigned to Project
Number of Years’
Experience
Education, Degree
Principle-in-Charge:
Project Manager
Asst. Project Manager
Other Key Member
Other Key Member
REFERENCES
Name Firm Providing
Reference
Phone # Email Address
Mike Alvarez, CGC, PWLFUtility Compliance Officer
DGomez@miamibeachfl.gov
City of Miami GardensLeslie Pettit, PEProject Manager
David GomezSenior CapitalProject Coordinator
954.329.8487305.622.8000 x 2570
Bal Harbour Village
City of Miami Beach
Town of DavieJonathan Vogt, PETown Engineer 954.797.1113
305.673.7000 x 6650
786.566.3562
jonathan_vogt@davie-fl.gov
MAlvarez@balharourfl.gov
lpettit@miamigardens-fl.gov
Sarah SinatraGould, AICP
Master in Urban & RegionalPlanningB.A. in Political Science
16
16Jenna Martinetti, PE B.S., Civil Engineering
Steve Watts, PSM
Erik Padron, PE
Sandra Lee, AICP CEP,CFM, LEED AP BD+C
36 BSLS; Land SurveyingHonorary
Electrical Engineering
BS Civil Engineering & MSCivil Engineering Structural
Jorge Cervantes, PE 32
22
M.A Biology/EcologyB.A Biology/Botany30+
246
247
City of Sunny Isles Beach |Request for Qualifications No. 20-07-01 37
RESPONDENT SUBMITTAL FORM
RFQ 20-07-01 Continuing Professional Consulting Services (CCNA)
The undersigned Firm proposes and agrees, if this submission is accepted, to enter into an agreement with
the City of Sunny Isles Beach to perform and furnish all Services as specified or indicated in the Contract
Documents.
The Firm accepts all of the terms and conditions of this Request for Qualifications. This Bid will remain
subject to acceptance for 90 days after the day of Bid opening. The Firms agrees to sign and submit the
Agreement and other documents as required by the Bidding Requirements within ten days after the date
of the City’s Notice of Award.
In submitting this response, the Firm represents, as more fully set forth in the Agreement, that:
The Firm has familiarized himself/herself with the nature and extent of the
Contract Documents, Work, site, locality, and all local conditions and Law and
Regulations that in any manner may affect cost, progress, performance, or
furnishing of the Work.
The Firm has studied carefully all reports and drawings of subsurface conditions
and drawings of physical conditions.
The Firm has given the City written notice of all conflicts, errors, discrepancies that
it has discovered in the Contract Documents and the written resolution thereof by
City is acceptable to the Firm.
This solicitation is genuine and not made in the interest of or on behalf of any
undisclosed person, firm or corporation and is not submitted in conformity with
any agreement or rules of any group, association, organization, or corporation;
the Firm has not directly or indirectly induced or solicited any other Firms to submit
a false or sham Bid; the Firm has not solicited or induced any person, firm or
corporation to refrain from Bidding; and Firm has not sought by collusion to obtain
for itself any advantage over any other Firms or over the City.
The City and the successful Firm will establish completion times for the services described in this Request
for Qualifications and the successful Firm agrees that the services will be completed within the time frames
agreed upon and stipulated in the individual Notice to Proceed.
248
249
City of Sunny Isles Beach |Request for Qualifications No. 20-07-01 39
AFFIDAVITS
250
251
PUBLIC ENTITY CRIMES
City of Sunny Isles Beach
18070 Collins Avenue
Sunny Isles Beach, FL 33160
Telephone: (305) 947-0606 Fax: (305) 949-3113
SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a)
FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES
PUBLIC ENTITY CRIMES
Pursuant to the provisions of paragraph (2) (a) of Section 287.133, Florida State Statutes - "A person or affiliate
who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a
Bid on a Contract to provide any goods or services to a public entity, may not submit a Bid on a Contract with a
public entity for the construction or repair of a public building or public Work, may not submit Bids on leases of
real property to a public entity, may not be awarded to perform Work as a Contractor, supplier, Sub-Contractor, or
Consultant under a Contract with any public entity, and may not transact business with any public entity in excess
of the threshold amount Category Two of Sec. 287.017, FS for thirty six months from the date of being placed on
the convicted vendor list".
THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER
OFFICIAL AUTHORIZED TO ADMINISTER OATHS.
11.1. This sworn statement is submitted to City of Sunny Isles Beach _____________
by____________________________________________________________________________ [print individual’s name and title]
for____________________________________________________________________________ [print name of entity submitting sworn statement]
whose business address is:
_______________________________________________________________________________
_______________________________________________________________________________
and (if applicable) its Federal Employer Identification number (FEIN) is_____________________.
(If the entity had no FEIN, include the Social Security Number of the individual signing this sworn
statement:_________________________________.)
11.2. I understand that a "public entity crime" as defined in Paragraph 287.133(1)(g), Florida Statutes, means a
violation of any state or federal law by a person with respect to and directly related to the transaction of
business with any public entity or with an agency or political subdivision of any other state or with the
United States, including, but not limited to, any Bid or Contract for goods or services to be provided to any
public entity or an agency or political subdivision of any other state of the United States and involving
antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation.
11.3. I understand that "convicted" or "conviction" as defined in Para. 287.133(1)(b), Florida Statutes, means a
finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any
federal or state trail court of record relating to charges brought by indictment or information after July 1,
1989, as a result of a jury verdict, non-jury trial, or entry of a plea of guilty or nolo contendere.
11.4. I understand that an "affiliate" as defined in Para. 287.133(1)(a), Florida Statutes, means:
a.) predecessor or successor of a person convicted of a public entity crime; or
b.) Any entity under the control of any natural person who is active in the management of the entity
and who has been convicted of a public entity crime. The term "affiliate" includes those officers,
directors, executors, partners, shareholders, employees, members, and agents who are active in
the management of an affiliate. The ownership by one person of shares constituting a controlling
interest in another person, or a pooling of equipment or income among persons when not for fair
DECEMBER 28, 2010
Calvin, Giordano & Associates, Inc.
1800 Eller Dr, Suite 600, Fort Lauderdale, FL 33316
65-0013869
Sarah Sinatra Gould, AICP, Planning Director
252
253
254
255
256
City of Sunny Isles Beach | RFQ No. 20-07-01 | Continuing Professional Consulting Services (CCNA)
Customer satisfaction is CGA’s primary objective for every project undertaken by the firm. As such, CGA endeavors to complete
each project on time and within budget. CGA is proud to assert that CGA has not failed to provide products, perform services,
or furnished goods for which we have been contracted.
1. Kevin Young vs. Calvin, Giordano, & Associates, Inc., Case NO: 0:13-cv-61870-Scola/Otazo-Reyes, filed in United
States District Court for the Southern District of Florida, Fort Lauderdale Division. ADA lawsuit. The parties have
dismissed this case with prejudice in accordance with Federal Rule of Civil Procedure 41(a)(1)(A)(ii). Dismissal with
prejudice, ECF No. 66) on December 19, 2014.
2. Hummer v. CTS1, Inc., Russell Engineering, Inc., Calvin Giordano & Associates, Inc, and AE Engineering, Inc. CACE
16-008549. This lawsuit relates to an alleged bicycle accident that occurred within the boundaries of the construction
project known as the A1A washout project along A1A in Fort Lauderdale, Florida [Broward County]. The nature of the
project related to widening sidewalks, reducing traffic lanes, adding traffic signals, and adding a seawall along A1A
Sunrise Boulevard North to NE 18th Street. Dismissed on 10/12/18 for Calvin, Giordano & Associates, Inc.
Calvin, Giordano & Associates, Inc.
Litigation Information (last 5 years)
August 2020
257
258
259