Loading...
HomeMy WebLinkAboutCraig A. Smith & AssociatesDue: August 18, 2020 Craig A. Smith & Associates, Inc. SECTION 8-TABLE OF CONTENTS Description Section Cover Letter and Executive Summary ............................................................................... C Project Approach and Understanding................................................................................ D1 Innovative Technology ...................................................................................................... D2 Qualification Information and Assigned Personnel ............................................................ E1 Prime Consultant SF330 Forms ........................................................................................ E2 Subconsultant SF330 Forms............................................................................... E3 Workload & Staff Availability................................................................................ E4 Licenses and Letters of Recommendation......................................................................... E5 Financial Stability.......................................................................................... .. .. . E6 Prime Firm References and Similar Work Completed .. ... .. ........... ..... ....... .... .... ... .. .. ....... ... F1 Subconsultant Firm References and Similar Work Completed .. . . .. .. .. . . .. .. .. . .. .. .. .. .. . .. .. . .. . .. .. F2 Organizational Chart . . . . . . . . . . . .. . .. . . . . .. . .. . .. . .. . .. . .. . . . . . . . .. . .. . . . . . . . .. . . . . .. . .. . .. . . . . . . . .. ........ .... F3 Corporate Standing and Authorized Signatory .. .. .. .. .. .. .. .. .. . . . .. . .. .. .. .. .. .. . .. .. .. . .. . . . . . . . . . . .. .. .. .. .. G Forms and Attachments . .. . . .. . . . . . . . .. . . .. .. . . . . . . . . . . . . . .. . . . .. . .. . .. . . . . . . . . . . . .. . . . . . . . .. . .. . . . . . .. .. .. . .. . . . .. .. . .. .. . H 1 Acknowledgement of Addenda .......................................................................................... H2 Certificates of Insurance.................................................................................................... H3 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 Craig A. Smith & Associates, Inc. 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 CRAIG A. SMITH & ASSOCIATES 21045 Commercial Trail • Boca Raton, FL 33486 CONSULTING ENGINEERS • SURVEYORS • VTIUTY LOCATORS August 11, 2020 Mauricio Betancur, CMC City Clerk City of Sunny Isles Governmental Center 18070 Collins Avenue, 4 th Floor Sunny Isles Beach, FL 33160 RE: RFQ NO. 20-07-01 www.c ralga s mlth.com CONTINUING CONTRACT FOR CIVIL ENGINEERING SERVICES FOR VARI OUS CITY PROJECTS CAS PROPOSAL NO. 3998 Dear Selection Committee: For your consideration, Craig A. Smith & Associates, Inc. (CAS) is pleased to submit this proposal in response to your Request for Qualifications for the Continuing Professional Consulting Services (CCNA) RFQ 20-07-01 . Executive Summary CAS is a 40-year established Civil/Utility Engineering, Utility Locating, Surveying, and Construction Management firm headquartered in Boca Raton, Palm Beach County, Florida with a branch office in both Broward County and Miami-Dade County. CAS overall has 40+ dedicated staff members consisting of registered professional engineers, registered professional surveyors, GIS specialists including technical CADD drafting personnel, certified field inspectors, utility locators, as well as exceptional administrative, clerical and accounting personnel, to provide the City with the expertise required to perform duties requested for engineering services, including survey, utility locates, design, engineering reports, utility modelling, permitting, bidding assistance, construction management through project close-out, grant preparation/administration and any other consulting engineering services as needed to assist the City in completing projects under this multi-year contract. CAS understands the scope of work requested by the City and has extensive experience in performing such duties. CAS is submitting proposal documents for the following categories as listed in the RFQ: 2. Civil Engineers, 3. Electrical Engineers, 4. Surveyors & Mapping, 7. Geotechnical Services, 8. Structural Engineering Services, 9. Environmental Engineering, and 10. Construction Engineering and Inspection (CEI) Services. CAS specializes in serving South Florida municipal governments and understands the needs of coastal communities such as the City of Sunny Isles Beach. We are a client-oriented firm and our emphasis is on providing exemplary service. CAS has been providing professional engineering services for stormwater system and roadway improvements to the City of Sunny Isles Beach since 2013 and commits to continue to provide our technical, professional and financial resources to the city. Understanding Scope of Work CAS understands the proposed scope of work. The type of capital improvement projects/assignments under this contract for the categories mentioned above include but are not limited to: general consultation, feasibility studies, engineering reports, monitoring/mitigation, planning, design, permitting, bidding assistance, and construction adm inistration and inspection services, on-site representation, roadway improvements, sidewalks, bridge reh abilitation/inspec tion, seawalls, structural components of buildings, stormwater/drainage system, water distribution, wastewater conveyance and collection system, lift/pump station rehabilitation, shoreline retreat prediction/mitigation, grant funding assistance/ad ministration and other municipal facility services and improvements as specified in the RFQ. The CAS Team is experienced in the design and rehabilitation of numerous similar utility and infrastructure projects in the City and the in Tri-County area at large. We highly value the City of Sunny Isles Beach as a client and look forward to continuing to serve the City with the utmost quality, cost effectiveness and expeditious service. The CAS Team's extensive knowledge and project experience will continue to be a benefit the City of Sunny Isles Beach. Please refer to Section E1 -Qualification Information and Assigned Personnel, Section E2 -Prime Consultant SF330 Forms, Section E3 -Subconsultant SF330 Forms, Section F1 Prime Firm References and Similar Work Completed and Section F2 -Subconsultant Firm References and Similar Work Completed. Firm's Current Workload CAS is currently reaching completion on many projects and is available to accept new projects. Please refer to the project list showing workload with percentage of completion in Section E4 -Workload and Staff Availabi lity. The CAS Manage ment Team will assign responsibilities to survey crews, utility locating crews, staff engineers, sub consultants and construction management and supporting staff as needed. All staff members involved in the project will be provided with the proper, resources, equipment and tools to perform the assign work. CAS ensures that it maintains adequate staff to 95◄.782.8222 561.31◄.◄◄◄5 561.31 ◄.◄◄58 PHONE FAX 561.31◄.◄◄53 561.314.◄◄59 305.9◄0.4661 City of Sunny Isles Beach August 11, 2020 Page 2 of 2 perform the work assigned and is able to increase staff as needed, due to its experience and reputation in the industry. The CAS TEAM is ready to allocate the necessa ry staff and resources and to work with the city in accomplishing its goals as per contract requirements. General Approach & Methodology We provide long term relationship-based engineering services to our clients. Our philosophy is to continue to work with city staff to provide the best possible services and solutions to complete projects cost-effectively and within the city's budget and schedule. CAS provides a team approach while making the city's staff an integral part of that team. The assigned improvement projects will be developed in the most cost-effective manner to achieve successful satisfactory results. The CAS philosophy utilizes a phased approach towards assisting the city in problem solving and for implementation of a cost effective and timely project completion. Our general project approach incorporates four phases consisting of the following: PHASE I -PROJECT DEVELOPMENT & PLANNING, PHASE II -SURVEY & ENGINEERING DESIGN, PHASE Ill -FINAL ENGINEERING DESIGN & BIDDING, PHASE IV-CONSTRUCTION MANAGEMENT and PHASE V-TESTING ST ART­UP & PROJECT CLOSEOUT. These phases are defined in detail in Section D1 -Project Approach and Understandin g. Continuity of Staff Our internal company culture has created an environment for staff to excel and experience satisfaction. CAS is proud to state that the current average employee tenure is over 12 years. The City of Sunny Isles Beach will have the advantage of knowing that our assigned staff will be there throughout the duration of this contract and beyond to offer continued knowledge as well as experience to serve the city's interests. Many key CAS staff have served the city in the past 7 years. The CAS Team Mr. Orlando Rubio, P.E. will be the Project Manager/Production Team Leader for the duration of the contract. He can be reached at (561) 314 4445 Ext. 203 or via email at orubio@craigasmith.com. In addition to our CAS staff, the following four (4)sub-consultants will provide the additional professional disciplines and support which will be necessary to fulfill the scopeof work for the applicable categories. The sub-consultants are as follows: Radise International, LLC. (certlffed SBE-M/WBEnrm with Palm Beach County, M/WBE State certffled Rorlda DOT DBE and South Rorlda Water Management District SBE) forgeotechnical, material testing and construction engineering and inspection (CEI) services, Smith Engineering Consultants, Inc. ( certffled CBE nrm with Broward County) for electrical engineering services, Bermello Aiamil & Partners, Inc. for environmental engineering and public outreach, and MUEngineers, Inc. (Certffled CSE nrm with Broward County)for structural engineering services. CAS is a full-service engineering firm and shall provide many major services "in-house"such as, overall project coordination, survey, utility locating, utility engineering design, cost estimating, permitting, biddingassistance, utility coordination, construction manag ement, and grant funding assistance, etc., thus allowing for a more cost­effective and efficient streamlined engineering process for many assigned projects. The CAS Team is also knowledgeablein the latest state and local regulatory requirements related to sustainability, resiliency and sea-level rise affecting SouthFlorida coastal communities. In addition, CAS always strives to provide "value-added" services to clients such as ourproprietary 3D Radar Tomography scanning technology (Refer to Section D2 -Innovative Technology). The CAS Teamis composed of quality and experienced local South Florida firms, all retaining previous similar project experience in the Tri­County area. Principal CAS Staff Mr. Stephen Smith, P.E., President/CEO is the Principal of the firm and is authorized to make representations for the firm and therefore will serve as the Principle-In-Charge for the duration of the contract. Mr. Smith can be reached by telephone at (954) 815-4111 or via email at ssmith@craigasmith.com. He will ensure the necess ary resources are provided for the duration of the contract. CAS, if selected by the City, is willing to meet at any location and commits to meet budget and schedule requirements for all assigned task orders on an as-needed basis. We believe we are the best firm to perform the advertised services because of our current and past experience with similar capital improvement projects in the City of Sunny Isles Beach and Tri-County area at large. We can provide comprehensive solutions due to our breadth of expertise based on years of experience, talent and innovation. We retain personnel with experience and training, along with a proven track record, to perform on time and within budget. CAS would be honored to have the opportunity to continue to work with the City of Sunny Isles Beach and looks forward to favorable consideration. Si��·� A Ste�, P.E., PresidenUCEO CONSULTING ENGINEERS • SURVEYORS • UTILITY LOCATORS • GRANT SPECIALISTS WW W .C RAIG ASMITH.CO M Craig A. Smith & Associates, Inc. 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 Craig A. Smith & Associates, Inc. Engineers • Surveyors • Subsurface Utility Engineering 30 Subsurface Imaging • Utility Coordination SECTION D1 -PROJECT APPROACH AND UNDERSTANDING GENERAL PROJECT APPROACH CAS utilizes a phased approach towards assisting the City in problem solving and for implementation of assigned projects. Our general project approach is as follows: PHASE I -PROJECT DEVELOPMENT AND PLANNING •Meeting with City Staff to develop the project scope (for each work authorization as assigned} •Develop a fee proposal to match the project scope as per established fee schedule •Finalize the scope and proceed with a kickoff meeting with the City Staff •Perform Pre-Design Field Condition Assessment •Develop Project Prioritization and Phasing (as needed} •Conduct Modeling/Feasibility Studies & Reports (as needed) •Provide Grant Funding Assistance/Admin istration (as needed} •Finalize Design Criteria •Prepare preliminary (conceptual) engineering design/plans •Outline specifications •Prepare preliminary construction cost estimate •Public Involvement/Community Outreach (as needed) CAS shall develop project scope, prioritize and phase design work for projects in a manner that will avoid schedule conflicts and allow for an efficient flow of work. CAS believes a high level of consistent communication will be essential in providing a successful completion of the assigned projects. Our management team will maintain a high level of communication with continuous accessibility to CAS staff and all other team members (sub-consultants). The CAS Team's goal is to seamlessly operate as an extension to City staff to satisfactorily complete projects on time and on or under budget. 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmlth.com • LB3110 �: t:?th & Assoclat� Inc. Engineers • Surveyors • Subsurface Utility Engineering 3D Subsurface Imaging• Utility Coordination PHASE II -SURVEY & ENGINEERING DESIGN •Survey site as needed •Soil borings and testing as required •Review existing record drawings, utility atlases and evaluate field conditions •Utility Locates utilizing available technologies, such as, Vacuum Soft Digs, EM Designation , 2-D GPR and use of 3D Radar Scanning •Utilize necessary Engineering design methods •Utility Coordination (Cable/Telecommunication Companies, FPL, Gas Companies, etc.) •Establish all design requirements SECTION D1 -PROJECT APPROACH AND UNDERSTANDING •Establish all permitting requirements •Prepare engineering (30%-60% construction plans) project plans •Quality control meetings with CAS staff •Meet with City Staff to review project design, schedule and budget •Adjust preliminary project quantities and estimated costs •Approval and adjustments to engineering project plans •Quality Assurance Review with City CAS' unified design process along with its unique utility locating capabilities allows for accurate design deliverables at an accelerated schedule. (i.e., 60% design plan deliverables at traditional 30% design phase). CAS' unified design process includes survey and utility locates which are services provided "in­ house" by CAS thus, eliminating the need for subconsultants for the development of basemaps and allowing for a streamlined efficient and more cost-effective design. Acquiring comprehensive and accurate utility locates in order to develop complete basemaps will be critical to the successful completion of most projects, eliminating design deficiencies. PHASE Ill -FINAL ENGINEERING AND BIDDING •Preparation of 90% design and final (1.00%) construction plans •Preparation of final specifications and contract documents •Quality Assurance Review with City •Finalize cost estimate; Develop Bid Tabulation (Schedule of Values) •Meet with City Staff to review final project design, schedule and budget •Finalize permitting (DERM, HRS, MIAMI­ DADE WATER & SEWER, MIAMI-DADE PUBLIC WORKS, FDEP, FDOT, CITY BUILDING DEPT., etc.) •Advertise for bidding •Provide plan adjustments and finalize for bidding •Bid project (typical 30 days); solicit qualified bidders •Prepare bid addendums and answer contractor RFl's •Assist City in receipt of bids •Review bids and bidder qualifications •Recommend award •Assist City with contract management )45 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 �: ti & Assocl&l8' Inc. Engineers • Surveyors • Subsurface Utility Engineering 3D Subsurface Imaging • Utility Coordination t•q- -I I ·----1u;- cu�­ ,,,:--!ior.-i::::= :±!,��- I I I I I I I J.i.�J I I I ..,10 I ·--I I I I I I I I I I ---=,?',.., r---It•_,,. .:.;. _.,. I ' ,�--=:::i - --tr�_: -t--. S--PRO \/l :::= ��-= -a=,:,·, � -... -=-�"'.:: t-:-:,t �-:-.: -----. -------=�� -. :-::.1 ----(-••;-· 1---1---t-­->------•--=-= l.£-:-�-�'"=-1------1--· :-=t---�--� c-o:---... � FOR CONSTRUC'TlON [-=:::ll�?-llc?�-½it�U .... :��gyp, U ��-IF-Eff �8 City of Sunny Isles: NE 17 4th Street Roadway & Drainage Improvements Project -Plan & Profile Construction Plan Sheet A 90% Design Review meeting will be scheduled with City staff for final comments and revisions prior to submitting to regulatory agencies for permitting. CAS has over 40 years of experience and understanding of the regulations and statutes in South Florida and as they pertain to utility and infrastructure projects in Miami-Dade County. Permitting Agency Coordination which includes compliance with the necessary regulations and proper communication with agencies is an important aspect of any project. Coordinating with permitting agencies during the early stages of the project to identify any "permitting challenges" that may impact the schedule of the project is very important. CAS's experience and relationships with local regulatory agencies combined with a proactive approach will ensure each project is permitted in a timely manner. Coordination with pertinent regulatory agencies for projects under this contract may include but not be limited to the Miami-Dade Water and Sewer Department. DERM, HRS, Miami-Dade Publlc Works, Rorlda Department of Transportation (FOOT) and the City of Sunny Isles Beach Bulldlng Department. PHASE IV -CONSTRUCTION •Mobilize and prepare site •Prepare safety plan •Project field stak�ut •NPDES permits & MOT plans •Shop drawing submittal and approval •Begin construction •Construction inspection and reporting •Construction management and administration •Public lnvolvement;Community Outreach Coordination •Adherence to contract/permitting requirements •Prepare & issue certificate for periodic payment •Final construction & restoration •Final punch-list 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www_craigasmith.com • LB3110 �: ii�h & Associates, Inc. Engineers • Surveyors • Subsurface Utility Engineering 3D Subsurface Imaging• Utility Coordination SECTION D1 -PROJECT APPROACH AND UNDERSTANDING CAS has a knowledgeable and experienced construction management team which is important for keeping a construction project on schedule, realizing potential cost savings and minimizing construction impacts. CAS has experienced staff to provide effective contract administration including cost estimating, schedule review, shop-drawing submittal review, processing of change orders and any other related construction management activities. CAS will ensure key construction project elements are documented and updated regularly and that any issues are addressed efficiently. CAS will ensure that the contractor is held accountable, abiding according to design documents and meeting all contractual obligations. Construction progress reporting, to the City of Sunny Isles Beach, will include summary of work completed, critical issues requiring resolution in order to maintain project schedule, planned budget versus actual cost to-date, planned work schedule for the next month and identification of any upcoming conflicts or other critical items requiring tracking and updating. PHASE V -TESTING, START-UP AND PROJECT CLOSEOUT •Pressure tests, bacteriological sampling & clearance, sewer lamping and material inspections •Lift & pump station operational testing/trouble shooting •Review record drawings •Prepare Project Startup •Prepare final accounting, certifications and close out reports •Project Close-Out QUALITY ASSURANCE/QUALITY CONTROL Quality control throughout the Project Duration is handled by means of a check and balance system and through the team's client relationships we form during the project providing continuous open, often face-to-face and honest lines of communication. CAS conducts weekly QA/QC meetings in-house every Monday to ensure the projects are on schedule and within budget. The CAS process will be methodical and timely in approach. The established goals identified in the project initiation will be implemented throughout the design, construction and close-out phase of each project. Members of the CAS Project Team will meet regularly to establish consistent quality review framework. 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 � Craig A. Smith & Associates, Inc. Engineers • Surveyors • Subsurface Utility Engineering 30 Subsurface Imaging• Utility Coordination SECTION D1 -PROJECT • APPROACH AND UNDERSTANDING •Quality Standards are fundamental to the success of the project. CAS prides itself on the consistent high quality of our output, whether it is project plans, specifications, design elements, comprehensive studies, survey, utility locates or grant writing. •At CAS we are committed to achieving and maintaining the highest quality standards possible and ensuring the client's satisfaction. Refer to the CAS Design Process Flow Chart at the end of this section as an example of the typical QA/QC process implemented for projects. ABILITY TO MEET PROJECT SCHEDULES CAS prides itself on our ability to tallor our services to meet our clients' needs. We are proud of our past history of successful design projects. This success is a result of our highly experienced staff members who have created a cohesive team ensuring projects are completed in a timely and cost effective manner. CAS is dedicated to execute assigned project schedules established at the beginning of each project. The CAS Team shall include a pre-design conference to establish the project contact with the City, regulating agency and CAS. From this meeting a detailed project schedule will be established. Design and Construction team progress updates will be provided on a monthly basis. Weekly project progress reports will be provided to the City upon request and to all involved with the project. Otherwise status of each milestone identified at the initial project "kick-off" meeting will be updated on a regular monthly basis along with any updates to the project schedule. The CAS process will be a methodical and timely approach. CAS will assist in implementing goals established in each project scope during the design and construction phase of each project. Many slmllar projects for other munlclpalltles that CAS provides engineering services for are grant funded and therefore have establlshed deadllnes that MUST be met In order to secure funding. CAS staff are well accustomed to working and completlng projects within strict deadlines. PROJECT MONITORING & BUDGETING In order to get the most accurate budget price at the pre-construction phase and the construction phase, the CAS Team details all design items into many small parts that will add up to one whole part (Bill of Materials or Schedule of Values). By doing this our cost estimates are very accurate. Our track record with cost estimates to bids has usually been within 5-10%. The CAS Team' philosophy utilizes this phased approach towards assisting the City in problem solving and for implementation of public works and planning projects. "Schedule, Cost Control and Team Work• -The CAS Team approach is to develop milestones and defined deliverables with the City in order to meet the City's requirements. We will identify potential issues early in the project so necessary action can be taken to keep the project on schedule. The CAS Team will provide the City of Sunny Isles Beach with the design and construction schedule for review and approval prior to commencement, including critical path items. CAS will review the project schedule with the City staff on a weekly or monthly basis and verify that it is consistent with the requirements of the contract for design, bidding and construction. Any changes to the schedule milestones or deadlines shall be approved by the City of Sunny Isles Beach. CAS will advise the City of any areas where the schedule is not in compliance with the contract. We will continually update the cost of each project (as needed) in order to stay on budget. If an issue develops with the schedule, cost or the budget, we advise the City and develop a plan for corrective measures with the staff. We consider the City and The CAS Team as one team, all striving for the same goal of a quality product on schedule and on or below budget. The CAS Team Te chnical Reviews shall be 21045 Commercia l Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 � Craig A. Smith & Associates, Inc. Engineers • Surveyors • Subsurface Utility Engineering 30 Subsurface Imaging• Utility Coordination SECTION D1 -PROJECT APPROACH AND UNDERSTANDING conducted throughout the project schedule by the principal and project managers of our firm as part of our commitment to qualit yengineering. The CAS Team will prepare an opinion of probable construction cost in accordance with the American Association of Cost Engineering (AACE) at the following stages of each assigned project (as needed): •30% schematic design •60% design development •90% design development •100% construction documents Cost estimates will be prepared for guidance in project evaluation and implementation from the information available at the time the estimate is developed. The final costs of each project will depend on actual labor and material cost, competitive market conditions, final project scope, implementation schedule, and other variable conditions. INNOVATIVE TECHNOLOGY -THE CAS ADVANTAGE The CAS Team's experienced engineering staff, in-house survey and extensive utility locating capabilities allows for the development of very accurate and complete basemaps for design of capital improvement projects. There is no second guessing as to the location of existing buried utilities (both active and abandoned), therefore greatly reducing or altogether eliminating change orders. This Is the •CAS ADVANTAGE". Our goal Is to have no change orders. Refer to Section 02 -Innovative Technology for further information. 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 Craig A. Smith & Associates CIVIL ENGINEERS I SURVEYORS I UTILITY LOCATORS TOPOGRAPHIC/ BOUNDARY SURVEY ** ** 3 DAYS OR LESS TURN-AROUND TIME (TYPICALLY) 100% BASE MAPS 60% DESIGN DESIGN PROCESS FLOW CHART RECORDS RESEARCH SUNSHINE ONE CALL PERMITS PREP/SUBMIT 2-D EMO UTILITY LOCATES 2-D PR 90% DESIGN POTHOLES / SOFT DIGS ** 3-D RT 100% DESIGN Craig A. Smith & Associates, Inc. Engineers• Surveyors • Subsurface Utility Engineering 30 Subsurface Imaging • Utility Coordination CADD FINAL CONSTRUCTION PLANS TO CONSTRUCTION SECTION D1 - PROJECT APPROACH & UNDERSTANDING Craig A. Smith & Associates, Inc. Craig A. Smith & Associates, Inc. 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 Craig A. Smith & Associates, Inc. Engineers • Surveyors • Subsurface Utility Engineering SECTION D2 -INNOVATIVE TECHNOLOGY SUBSURFACE UTILITY ENGINEERING (SUE) -3-0 RADAR TOMOGRAPHY utlllty 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 � Craig A. Smith & Associates, Inc. SECTION D2 -INNOVATIVE. TECHNOLOGY Engineers • Surveyors • Subsurface Utility Engineering The •CAS Advantage• -Benefits of a Unified Design Process and the Use of 3-D Radar Tomography CAS has the unique capability of providing clients with survey and advanced utility locates for utility design projects. CAS' highly experienced survey crews and utility locating staff with the use of all the latest technology, coordinate closely with project engineers and collect field data with engineering principles and guidelines in mind. The fact that CAS provides such a unified process to design allows for fast tracking of design projects. CAS' unique capability in providing 3-D Radar Tomography scanning provides continuous x,y,z positioning of buried utilities with great accuracy (+/-2inches horizontally and +/-6 inches vertically) along with the associated topographic profile (ground surface elevations). The 3-D Radar Tomography unit is equipped with an array of 17 antennas that "cross communicate" thus allowing for the level of accuracy stated above. Generally, utilities to a buried depth of up to 15 feet can be identified by this technology and all pipe material type can be located, including bends/fittings and offsets. Also, abandoned facilities and non-utility anomalies can be identified that could potentially interfere with design elements. The use of this technology can be especially beneficial for aged utility areas where record drawings are poor or non­ existent. The implementation of 3-D Radar Tomography (3-D RT) to water main relocation projects as proposed under this contract offers a practical solution to this critical issue. This allows for the generation of very accurate and complete base maps which, in turn, acce lerates the design process delivering 60% design plans at a typical 30% design plan submittal. In addition, this translates to superior final construction plans, greatly reducing the potential for changes orders and delays during construction due to unforeseen conflicts. Each 3-D RT unit scans a 6-foot wide pass. Under ideal conditions (unobstructed clear areas), 5 acres per day can be scanned with a single 3-D Radar Tomography scanning unit. The use of 3-D RT can reduce the need of vacuum excavation by 90% for locating subsurface utilities, thus reducing surface impacts and restoration. 3-D RT is very cost competitive when compared to traditional SUE methods due to the speed of data acquisition, accuracy and processing time. _,. ,.... ,. ·· .--30 Rendering of lhe layers 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 Craig A. Smith & Associates, Inc. SECTION D2 -INNOVATIVE TECHNOLOGY Diagram 1 Diagram 2 21045 Com mercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 SECTION D2 -INNOVATIVE. Craig A. Smith & Associates, Inc. TECHNOLOGY Engineers • Surveyors • Subsurface Utility Engineering Once the data is processed and downloaded in Autodesk Civil 3-D, a 3-D model of the subsurface conditions can be generated along with the traditional plan and profile drawings as base maps for design. I. II Typical 3-D Model Deliverable of Subsurface Utllltles ]( CAXld X. iUHR i XstoclJ.ffS ][�"-···s-�--� ...,.o, 8PEOF,C PUA POSE 8URVEY a.W.lltAWH.111 P\.,lNM«,t'ltOf"ll..E(llllatn'SDl!I "" a)t;),,60 -3)1'•14 Typical Civil 3-D CADD Plan & Profile Deliverable TOMOC-BAPH'! COLOR UPEND c.:,; . .;: =>11f'.22j I 1�1'ts J e 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 Craig A. Smith & Associates, Inc. Engineers • Surveyors • Subsurface Utility Engineering SECTION D2 -INNOVATIVE TECHNOLOGY 3-0 Radar Tomography -Limiting Factors 3-D RT is generally very successful in scanning through sandy soils, gravel, limestone, granite, asphalt, concrete and shale, but readings can be inhibited by dense organic soil material such as muck, clay or peat. Also, flowable fill may limit the radar's penetrating ability. In addition, narrow corridors (less than 6 feet wide) with numerous above ground obstructions such as utility poles, cable boxes, bollards, or FPL transformers may limit the 3-D RT unit's accessibility. The use of 2-D GPR may be preferred in such restricted areas. Subsurface Utlllty Engineering Services for Clients Our current and past clients for subsurface utility engineering services include federal, state, county, city government facilities; U.S. Naval facilities; NASA Facilities; Port Authorities; design engineers and contractors. CAS maintains unlimited qualification with FOOT in categories 3.1, 7.1, 8.1 & 8.2. CAS is also licensed by the State of Florida Department of Business and Professional Regulation Board of Surveyors as an Engineering Survey firm, Land Bureau number 03110 (LB 03110). CAS performs subsurface utility engineering & coordination services for numerous municipal clients and is licensed and capable of performing proprietary and patented 30 Radar Tomography services throughout the United States. CAS performs comprehensive subsurface utility engineering for many municipalities on a contractual basis, serving as the municipalities' One Call respondent. In this capacity, CAS staff members perform hundreds of utility line designations every week. CAS also performs 2D Ground Penetrating Radar locates and vacuum excavations for our municipal and private clients. In addition to providing One Call locates, CAS serves as the municipalities' or clients' "clearing house" for design related utility services providing plan mark-up, level D through A utility marking services, and coordination response in accordance with Utility Accommodation Manual requirements. CAS is currently providing utility locating services for the following: •City of Hollywood . City of West Palm Beach •City of Coconut Creek . Town of Jupiter •City of Lauderhill . FPL . Town of Pembroke Park . FOOT . Town of Davie . Marathon OIi Corp. . City of Pembroke Pines . Citgo Petroleum . City of Weston . Port Everglades 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 � Craig A. Smith & Associates, Inc. Engineers • Surveyors • Subsurface Utility Engineering SECTION D2 -INNOVATIVE TECHNOLOGY Additionally, in the past CAS has performed various locating services for the foll owing: •Town of Golden Beach •City of Sweetwater •City of Tampa •City of Aventura •City of North Miami Beach •City of North Miami •City of Cooper City •Broward County Pasco County •Miami-Dade County •Palm Beach County •Sarasota County •Colller County •NASA Kennedy Space Center •Hardee County •AT&T/ BellSouth • us Mllltary Facllltles •City of Miami Gardens •VIiiage of Bal Harbour •US Navy, NAS Key West •TECO Peoples Gas •Tampa Electrlc •Martin County •Colonlal Plpellne •Marathon Plpellne •Valero Energy •Armada Hess •Motive (Shell) Enterprises •Port of Tampa •Port of Jacksonville •Koch Plpellne •Buckeye Partners •Progress Energy •Orange County •JEA•us Park Service •Central lntelllgence Agency US Air Force •USArmy Balfour Beatty/ Parsons Brinkerhoff CAS performs all utility related surveys in accordance with Minimum Technical Standards for Surveying & Mapping, ASCE 38/02. All survey work is performed under the direct supervision of a licensed professional surveyor. CAS is fully compliant with major CADD software platforms (AutoCAD Civil 3D & AutoDesk Civil Design). Quallty Assurance / Quallty Control -CAS maintains a comprehensive Quality Control and Assurance program including, independent reviews by principal members of the firm. The principals maintain a vested financial interest in the operation of the firm and output of quality deliverables. CAS performs quality reviews through each phase of the project, up and through to deliverables. Quality reviews are performed at the staff, project engineer, project manager and principal levels. Records of all deficiencies found are noted and recorded. Corrections to deficiencies are checked against previously noted items and confirmed for correction and compliance. This process is repeated through each project phase, through final delivery. 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 Craig A. Smith & Associates, Inc. 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314--4445 • www.craigasmith.com • LB3110 � Craig A. Smith & Associates, Inc. Engineers • Surveyors • Subsurface Utility Engineering 3D Subsurface Imaging • Utility Coordination SECTION E1 -QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL FIRM OVERVIEW Craig A. Smith and Associates, Inc. (CAS) is a Florida Corporation licensed for the practice of Professional Engineering, Surveying, Utility Locates Services and Construction Management. CAS is a local South Florida firm with corporate headquarters located in Boca Raton and branch offices in Miami-Dade and Broward County. Broward Office: 277 Goolsby Blvd. Unit 4C Deerfield Beach, FL 33442 (954)782 8222 OFFICE LOCATIONS Palm Beach Office: Corporate Headquarters 21045 Commercial Trail Boca Raton, FL 33486 (561)314 4445 Miami-Dade Office: 815 NW 57th Avenue, Suite 200-1< Miami, Florida 33126 (305)940-4661 CAS was established In 1980. Since then, the firm expanded from its original, technical orientation in municipal engineering and surveying into a full service civil engineering practice with specialized expertise in engineering, surveying & mapping, grants/loan assistance, construction management, utility locates and CAD design & development. FIRM SIZE -CAS's professional, technical and administrative personnel numbering 40+ people represent professionals in the fields of civil engineering, water and wastewater engineering, storm water engineering, surveying, mechanical engineering, construction engineering, grant speciali sts, utility locating, computer sciences, and finance. More specifically, CAS staff members consists of experienced registered professional engineers, professional surveyors, certified CADD technicians, GIS specialists, certified field inspectors, utility locators as well as competent administ rative, clerical and accounting personnel, to provide you with the expertise required to perform the duties requested under this contract. ORGANIZATION -CAS is organized into five technical operating divisions each under the supervision of a Vice President or Director. These operating divisions are: 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561.-314-4445 • www.craigasmith.com • LB31.10 � Craig A. Smith & Associates, Inc. Engineers • Surveyors • Subsurface Utility Engineering 3D Subsurface Imaging • Utility Coordination •Clvll Engineering •CADD (Computer -Aided Design & Drafting) •Construction Management SECTION E1 -QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL •Surveying •Subsurface Utlllty Locates NUMBER OF EMPLOYEES AT EACH OFFICE LOCATION PALM BEACH OFFICE CADD Technical 3 Civil Engineering 8 Construction Inspection 3 Land Surveyors 4 Utility Locators 4 Administration 7 BROWARD OFFICE Land Surveyors 2 Utility Locators 8 MIAMI-OADE OFFICE Land Surveyors 1 Utility Locators 2 ARM PHILOSOPHY & EXPERIENCE -CAS is committed to providing its clients with cost-effective, timely, comprehensive, high-quality professional services in the practice of civil engineering, surveying, construction management, utility locating and granVlegislative services. This commitment to excellence is achieved through the development of a team spirit of service to clients. CAS is a full-service civil engineering firm and has extensive local South Florida experience in engineering design and construction management of utility and infrastructure projects spanning over 40 years. CAPABILITIES & CLIENT SERVICES Craig A. Smith & Associates (CAS) is a local South Florida client-oriented firm tailored to serving the needs of many governmental clients. We currently serve numerous other municipalities (counties, cities, towns, special districts and utility departments/authorities) with similar services. CAS is highly experienced and qualified to perform consulting services with respect to Civil Engineering -specifically, utility (water & wastewater) engineering drainage/roadway design, master/project planning, surveying, permitting, bidding assistance, construction management, Subsurface Utility Engineering (Utility Locates), and grant funding assistance, more specifically for the following categories as described in the Scope of Services of this RFQ: 2. Clvll Engineers, 4. Surveyors and Mapping, and 10. Construction Engineering and Inspection (CEI) Services. Additional categories and services described in the RFQ, such as 3. Electrlcal Engineers, 7. Geotechnlcal Services, 8. Structural Engineering Services and 9. Environmental Engineering will be provided by qualified subconsultants that will comprise the CASTeam. Our success can be exhibited by our tenure with our clients, many of which we have served for over 20 years. We put premium value on the opinions and input of the end users of our services, officials, staff and residents and strive to produce an end product that addresses their needs and expectati ons. CAS is committed to making clients successful by understanding their organization, methods of operation, challenges and achieving their objectives through a multi-discipline approach based on experience, 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 Craig A. Smith & Associates, Inc. SECTION E1 -QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL CLIENTS CCPWA CIVIL ENGINEERING 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 � Craig A. Smith & Associates, Inc. Engineers • Surveyors • Subsurface Utility Engineering 3D Subsurface Imaging • Utility Coordination •Storm Water Management •Storm Water Utilities •Water Treatment & Distribution Systems •Wastewater Collection/Transmission & Treatment •Potable Water Treatment Systems •Wastewater Pump Station Design •Stormwater Pump Station Design •Canal Dredging and Sediment Removal •Surface Water Management •Utility Permitting •Water/Wastewater Treatment Plant Design/Rehabilitation •Utility Pipeline Design & Relocation (Water, Wastewater & Reclaimed Water) •Utility Master Planning •Grant Funding Assistance SECTION E1 -QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL •Facility Planning •Solid Waste Studies •Solid Waste Disposal and Leachate Treatment •Development Permitting •Feasibility Studies •Inflow & Infiltration Studies •Construction Cost Estimate •Construction Management •Construction Observation and Certification •Contract Administration •Effluent Reuse & Disposal •Sludge Treatment & Disposal •Roadway & Drainage Design I I "' ' �-:-� .::;•· •,.'( ---,:� .,.. _.._,,... I ;_ ,"" I �-----•-•-•••• SE!: SH££T C-12 FOR CONTINUATION I FOR CONSTRUCTION d.n ... ttmt "OIJ.fflA'tMPflOVtM£KTS � . .,,., I c::=::.:;.-:;;;-:;:;:: 1 8 ( f.t\"r't'a ) C-10 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 � Craig A. Smith & Associates, Inc. Engineers • Surveyors • Subsurface Utility Engineering 3D Subsurface Imaging • Utility Coordination SECTION El -QUALIFICATION INFO RMATION AND ASSIGNED PERSONNEL SURVEYING -CAS is one of South Florida tenured and respected surveying firms that provides complete land surveying services. Our surveying staff is comprised of licensed land surveyors who ad here to strict standards and give special attention to accuracy and detail. CAS utilizes the most up to-date electronic survey equipment such as Topcon and Trimble SC Robotic Total Stations, Trimble 5800 RTK Base/Rovers, Leica P 30 Laser Scanners, Recon 400 TDS, TSCE 2 and Ranger 500X Data Collectors along with Topcon ATC Levels and tablets. In addition, our survey crews have been trained based on engineering principles and implement daily quality control measures ensure that our clients receive the highest quality service and most accurate basemaps. CAS surveying services include: •Mapping & Platting •Boundary & Acreage Surveys •Land Description Preparation •Construction Surveys •Subdivision Designs & Calculation •GPS Mapping •Route Surveys •Canal Cross-Sections •Parcel Description & Sketches •Condemnation Surveys •Highway Construction Surveys •Quantity Surveys •Accident Surveys •As-Built Certifications •Mean High Water Surveys •Title Searches •Drone Aerial Imagery and Surveys CAS' "In-house"' surveying capabllltles ellmlnates the need for an addltlonal subconsultant for this service and thus allows for more cost-effective and faster response to revisions or modifications to basemaps or scope of work as requested by the City or as required for the duration of the contract. I m � - ' .---1�-� 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 � Craig A. Smith & Associates, Inc. Engineers • Surveyors • Subsurface Utility Engineering 3D Subsurface Imaging • Utility Coordination SECTION E1 -QUALIF ICATION INFORMATION AND ASSIGNED PERSONNEL CADD (COMPUTER-AIDED DESIGN & DRAFTING) -CAS employs an on-staff Florida Certified American Design & Drafting Association CADD operator and an Autodesk Certified professional. Our CADD technicians prepare detailed drawings, layouts, exhibits, topographical maps, and graphic representations of survey information & engineering designs. Designs relate to engineering projects such as water, sewer, reclaimed water, paving and drainage systems. Craig A. Smith & Associates prides itself on keeping its workforce educated and equipped to handle today's most challenging and rewarding tasks. CAS is utilizing the latest AutoCAD software (Civil3D), custom-built AutoCAD systems and functions, as well as some industry-first hardware including 3D laser scanning technologies. In summation, the CADD systems CAS uses are: •AutoCAD •Autodesk 2019 Civil 3D •Autodesk Map 30 The City will benefit from CAS' experienced CADD staff which wlll work closely with project managers and City staff on assigned capital Improvement projects and provide any technlcal support to City staff related to Autodesk Clvll & Map 30 use. 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 Craig A. Smith & Associates, Inc. SECTION E1 -QUALIFI CATION INFORMATION AND ASSIGNED PERSONNEL• 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 � Craig A Smith & Associates, Inc. Engineers • Surveyors • Subsurface Utility Engineering 3D Subsurface Imaging • Utility Coordination SECTION E1 -QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL CONSTRUCTION MANAGEMENT -The CAS construction management team has a combined total experience of nearly 80 years. CAS field representatives are qualified to perform a full-service program, assuring total monitoring on-site to protect the client's interest on their projects. The CAS construction management team will keep the client informed of all facets of construction including, but not limited to, weekly progress notices, advice on any change orders and monthly monitoring of project finances. The construction management team of professionals provides extra attention to detail to ensure that all projects are built to specifications and are fully operational to meet the needs of our client. CAS construction management services include: •Value Engineering •Design Document Review •Contract Administration •Contract Documents •Construction Management •On-site Representation •Construction Engineering & Inspection •Cost & Payment Verification •Bidding Coordination •Contract Negotiation •Residential/Commercial/Municipal Project Observations 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 � Craig A. Smith & Associates, Inc. Engineers • Surveyors • Subsurface Utility Engineering 3D Subsurface Imaging • Utility Coordination SE CTION E1 -QUALIFICATION INFORMATION AND ASSIGNED PE RSONNEL GRANT ASSISTANCE EXPERIENCE Since the early 1990's CAS has assisted our clients with securing grant funding and financing for multiple infrastructure projects. We assisted our clients (municipalities, counties, special districts and utility authorities) in obtaining grants and/or loans through multiple funding sources such as: USDA, SRF, FEMA (HMGP), State Legislative Appropriations, SF WMD Cooperative Agreement Program, EPA 31.9 Program, CDBG, etc. CAS assists our clients with the preparation of grant applications, supporting documents, such as preliminary engineering reports, environmental assessments, preliminary designs, project scope development, cost estimating, present worth cost analysis, cost benefit analysis, project beneficial use, etc. CAS continually provides many of these services to our clients annually for state appropriation requests or during grant funding cycles. CAS provides grant evaluation for competitive grants requiring scoring and consultation with respect to the need for phasing of projects to achieve a high success rate from funding institutions. CAS is continually involved with infrastructure funding assistance and has a high success rate in securing funding. We understand the nuances of "grantsmanship." CAS is committed to providing these services to all of our clients, with an estimated 70-80% of our on-going projects being funded through our assistance. CAS is also aware of the deadlines required in achieving these grants/loans and delivers grant assistance services on time. Some of the capital improvement projects that CAS has acquired granting funding (indicating dollar amount secured and funding source) are as follows: •Town of Golden Beach Stormwater Improvements -$9,500,000 (FEMA Funded); $1,500,000 (SRF Funded) •City of Lake Worth Beach: Lake Osborne Estates Water Main Improvements -$2,153,224 (SRF Funded) •Spring Lake Improvement District (SLID): Design & Construction of a 70 Acres Stormwater Treatment Area (STA) -$1.,666,000 (25% SRF /75% FDEP 31.9 Funded) •Spring Lake Improvement District (SLID): Design and Construction of a 80,000 GPO Wastewater Treatment Plant -$3,300,000 (SRF Funded) •City of Moore Haven: Design and Construction of a 500,000 GPO ultrafiltration (Zenon) system to expand an existing 750,000 GPO Lime Softening Water Treatment Plant -$3,663,800 (USDA Funded) •Town of Pembroke Park: Wastewater Master Plan for the rehabilitation of 22 Wastewater Lift Stations -$1.00,000 (FDEP Legislative Funded) •South Bay Water Treatment Plant and Water Distribution Improvements - $1.,200,000 (USDA Funded) •Port Labelle: Design and Construction of a 900, 000 GPD Reverse Osmosis Water Treatment Plant (ROWTP) -$5,500,000 (USDA Funded) 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 � Craig A. Smith & Associates, Inc. Engineers • Surveyors • Subsurface Utility Engineering 3D Subsurface Imaging • Utility Coordination SECTION E1 -QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL• LOCAL STORMWATER/DRAINAGE PERMITTING & REGULATORY EXPERIENCE CAS successfully completed the NE 174 th Street Roadway and Drainage Improvement Project which consisted of a reconstruction of the drainage and the road for approximately 0.2 miles from Collins Avenue to North Bay Road. The CAS Team has knowledge of local, state and federal regulations and is aware of sea level rise forecasts and its impact on South Florida communities. Sea levels in South Florida are expected to rise 40 inches in the next 50 years. Capital projects funded in 2021 under the new State Legislation SB-178 shall consider the impact of rising sea levels and assess the vulnerability of their facilities including utilities, surface water management, and other inf rastructures. More specifically this bill requires all public entities that commissions or manages a construction project within the coastal building zone (5000' + coastal control line from seasonal high water line) using State funds, to conduct a Sea Level Impact Project (SLIP) study before construction. The SLIP needs to be submitted to FDEP, signed by a professional engineer, and it will be published on FDEP's website for at least 30 days before construction can start. This rule applies for all projects starting construction after July 1, 2021 and it is the responsibility of the construction company. Some of the main items that the SLIP will cover are the following: •Assess the flooding, inundation and wave action damage risks faced by the structure over 50 years. •The study must take into account the projected SLR and increase storm risks as well as land subsidence. •Potential public safety and environmental impacts resulting due to failures for leakage of pollutants, electrocution and explosion hazards and floating of flying debris •The study needs to include alternatives for the design and siting •The study must analyze the risks and costs associated with maintaining, repairing and constructing of the structure. 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 � Craig A. Smith & Associates, Inc. Engineers • Surveyors • Subsurface Utility Engineering 3D Subsurface Imaging • Utility Coordination SECTION E1 -QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL SIMILAR PROJECT EXPERIENCE WITHIN THE PAST 5 YEARS WATER DISTRIBUTION. SEWER COLLECTION SYSTEMS & FORCE MAIN PROJECTS •Glades County -Washington Park Sanitary Sewer Improvements-Phase I, Moore Haven, Rorlda Status: On-going (Beginning Construction Phase) Prime Consultant: CAS Key CAS Staff: Gene R. Schriner, James Orth, Keith Schriner, Robert KeenerScope of Work: Survey, design, permitting, preparation of construction plans, cost estimates, contract documents, assistance during bidding, construction management and certification through project close-out for a new park/playground for residents, one (1) duplex submersible sanitary sewer lift station, 1, 750-LF of FM, 9,630-LF of gravity sewer collection system, sewer services for approximately 120 existing units with the potential of servicing approximately 300 units at residential buildout. Phase I includes the construction of the wastewater lift station, force main and 800 linear feet of gravity sewer. This project is 50% CDBG funded with matching funds being provided by Glades County. Pro/ect Challenges & Approach: Engineering analysis was made to determine the optimal feasible location of the wastewater lift station to maximize gravity sewer service connections prior to final engineering design. Design Cost Clncludlng Construction Management): $134,000 Construction Cost: $615,000 •City of Lake Worth Beach -Lake Osborne Estates Water Main Replacement Project -Phase I, Lake Worth, Florida Status: On-going (Construction Phase -75% Complete) Prime Consultant: CAS Key CAS Staff: James Orth, Dimitrios Scarlatos, Frank Vilar, Robert Keener, James F. Driscoll, William TantoScope of Work: Survey, utility locates, design, permitting, preparation of construction plans, cost estimates, contract documents, assistance during bidding, construction management and certification through project close-out for the replacement of approximately 16,400 linear feet of water main varying in size from 4" to 12" serving 228 homes in the Lake Osborne Estates residential area. The majority of the existing water mains and water services are located in the rear of properties and have exceeded their useful life, requiring relocation to the frontage of homes. Addltlonal services Include public outreach and preparation of application package for SRF funding. The contracted construction cost was approximately $800,000 below the engineers estimate and SRF loan has been secured for the project. The project completion date has been 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 � Craig A. Smith & Associates, Inc. Engineers • Surveyors • Subsurface Utility Engineering 3D Subsurface Imaging • Utility Coordination SECTION E1 -QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL extended due to owner requested expansion to scope of work. Pro/ect Challenges & Approach: Records drawings for this project are extremely limited. CAS performed utility locates and coordinated with City O&M staff where necessary to verify locations of existing water mains, valves and services and designed new water mains in a manner which minimized water service disruption to customers and reduced restoration impacts to roadways, driveways and landscaping. In addition, CAS through public informational meetings familiarized homeowners with the project scope and involved them during the design process by incorporating design elements such as location of water service lines and meter box location preferences on their property and addressed any other concerns during the design and construction phase. In addition, project construction scheduling (phasing) was clearly provided to homeowners well in advance of construction. Design Cost: $310,149 Construction Cost: $2,618,649 •Hardee County -Wauchula HIiis Water Main Improvements -Phase VI, Wauchula, Florida Status: On-going (Construction Phase -60% complete) Prime Consultant: CAS Key CAS Staff: Gene R. Schriner, Greg Giarratana, Keith Schriner, Robert D. Keener Scope of Work: Survey, design, contract document development, permitting, bidding, construction management and observation through project close-out for the installation of approximately 1,000 linear feet of 6" water main, 4,000 linear feet of 8" water main, and 4,450 linear feet of 10 water main including roadway/driveway restoration including fire hydrants and valves, and connections to existing 4" and 12" water mains. Pro/ect Challenges & Approach: Community outreach and coordination with residents for water service connections is essential for the successful completion of this project. Also close coordination with the contractor during construction has been maintained in order to ensure that driveway and roadway damage/restoration Is minimized. Design Cost {Including Construction Management): $100,426 Construction Cost: $1,775,635 •Hardee County -Wauchula HIiis Water & Sanitary Sewer Improvements -Phase V, Wauchula, Florida Status: On-going (Construction Phase -80% complete) Prime Consultant: CAS Key CAS Staff: Gene R. Schriner, Greg Giarratana, Keith Schriner, Robert D. Keener Scope of Work: Survey, design, contract document development, permitting, bidding, construction management and observation through project close-out for the installation of approximately 7,500 linear feet of 8" water main including fire hydrants, one duplex submersible wastewater lift station, approximately 1,500 linear feet of 6" force main and approximately 5,000 linear feet of 8" gravity sanitary sewer. Prolect Challenges & Approach: Community outreach and coordination with residents for water and sewer service connections is essential for the successful completion of this project. Also close coordination with the contractor during construction has been maintained in order to ensure that driveway and roadway damage/restoration is minimized. Design Cost Clncludlng Construction Management): $221,453 Construction Cost: $2,068,956 •City of Margate -2018 Water Main Improvements, Margate, Aorlda Status: On-going (Construction Phase -50% complete) Prime Consultant: CAS 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 � Craig A. Smith & Associates, Inc. Engineers • Surveyors • Subsurface Utility Engineering 3D Subsurface Imaging • Utility Coordination SECTION E1 -QUALIFICATION IN FORMATION AND ASSIGNED PERSONNEL Key CAS Staff: James Orth, Greg Giarratana, Keith Schriner, Robert Keener, James F. Driscoll, Tony Gomes Scope of Work: Survey, design, utility locates, preparation of construction plans and contract documents, permitting, bidding assistance, construction management and limited construction observation through project closeout/start-up services for the replacement of 2-inch galvanized steel water mains with 6-inch DIP at fifteen (15) different locations throughout the City including a total water main replacement of approximately 12,000 linear feet, GPR scanning, locates, test hole investigations, water service replacements, asbestos concrete pipe removal, fire hydrant replacement, fire hydrant spacing analysis and a valve shutdown plan. Pro/ect Challenges & Approach: The project area is discontinuous and the water main replacements are being made in a corridor that Is very congested with burled utilities. Comprehensive sub surface utility engineering was essential to determine a feasible new water main alignment. The project is being constructed in phases in order to minimize restoration Impacts at any given time. CAS is also coordinating closely with City staff to address any resident concerns or complaints during construction. Design Cost: $212,280 Construction Cost: $1,407,821 •Spring Lake Improvement District -Force Main & Water Main Installation Project to provide service to the New Wastewater Treatment Plant, Sebring, Florida. Status: Completed 201.9 Prime Consultant: CAS Key CAS Staff: James Orth, Greg Giarratana, Keith Schriner, Robert Keener, James F. Driscoll, Michael JonesScope of Work: Survey, design, preparation of construction plans, contract documents, permitting, bidding, construction management and SRF funding assistance and administration through project closeout/start-up services for the construction of 9,505 linear feet of 8"-1.0" force main and water main to the New Wastewater Treatment Plant site. The project was 100% SRF funded. This project was completed on time and within budget. Design Cost {Including Construction Management: $125,500 Construction Cost: $750,000 •City of Belle Glade -Torry Island Sanitary Sewer Extension, Belle Glade, Florida Status: Completed 2019 Prime Consultant: CAS Key CAS Staff: James Orth, Al Caruso, Robert Keener, James F. Driscoll, Willian Tanto, Michael JonesScope of Work: Survey, design, preparation of construction plans and contract documents, permitting, bidding, construction management through project closeout for the extension of the existing gravity sanitary sewer system at the Torry Island Campground and Marina. More specifically the project included expansion of the existing gravity sewer collection system with 1.31. sewer lateral connections to select campsites along Kentucky, Florida, Georgia, Main Street and Liars Island. Design included installation of a private duplex lift station, 1.52 linear feet of 2" PVC sewer force main, 1,546 linear feet of 8" gravity sanitary sewer with 8 associated manholes. Additional improvements included electrical service upgrades and hose bib installations at each campsite. This project was completed on time and within budget. Design Cost: $1.83,200 Construction Cost: $1.,639,631 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 � Craig A. Smith & Associates, Inc. Engineers • Surveyors • Subsurface Utility Engineering 30 Subsurface Imaging • Utility Coordination SECTION E1 -QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL •Hardee County - Wauchula HIiis Water & Sanitary Sewer Improvements -Phase IV, Wauchula, Florida Status: Completed 2017 Prime Consultant: CAS Key CAS Staff: Gene R. Schriner, Greg Giarratana, Keith Schriner, Robert D. KeenerScope of Work: Survey, design, contract document development, permitting, bidding, construction management and observation through project clos�ut for the installation of approximately 6,125 linear feet of 8" water main and 5,277 linear feet of 8" gravity sanitary sewer including connection to 51 private residences and the decommissioning of septic tanks. This project was completed on time and within budget. Pro/ect Challenges & Approach: Community outreach and coordin ation with residents for water and sewer service connections was essential for the successful completion of this project. Also close coordination with the contractor during construction was necessary in order to ensure that road damage/restoration was minimized. Design Cost Clncludlng Construction Management}: $189,628 Construction Cost: $1,249,013 •City-County Publlc Works Authority (CCPWA} -Avenue R Wastewater Collectlon/Conveyance System Improvements, Moore Haven, Florida Status: Completed 2017 Prime Consultant: CAS Key CAS Staff: Gene R. Schriner, Keith Schriner, Greg Giarratana, Robert KeenerScope of Work: Survey, design, preparation of construction plans and contract document development, permitting, bidding, construction management, const ruction observation through project closeout/start-up services for the installation 1,200 linear feet of 8-inch FM replacement, one (1) 180-linear foot directional drill, seven (7) sanitary sewer manhole structures, 2,800 linear feet of gravity sewer, thirty-two (32) service laterals, fifty-two (52) clean-outs for residential hook­ ups, roadway reconstruction. This project is a continuation of an existing system and part of a gravity sewer collection master plan which addresses infrastructure needs within the southeastern residential area of the City. This project was completed on time and within budget. Design Cost {Including Construction Management}: $47,280 Construction Cost: $426,787 •Mlccosukee Tribe of Aorlda -Water Distribution System Improvements, Miami Dade, Aorida Status: Completed 2015 Prime Consultant: CAS Key CAS Staff: Gene R. Schriner, Greg Giarratana, Robert KeenerScope of Work: Survey, design, permitting, contract development, bidding services and construction oversight for the installation of 15,000 LF of 12" water main which included eight (8) 12• diameter horizontal dlrectlonal drllllng installations, one (1) s• horizontal dlrectlonal drill and new water service lines to residences. This project was completed on time and within budget. Design Cost: (Including Construction Management} $516,000 Construction Cost: $2,580,000 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 � Craig A. Smith & Associates, Inc. SECTION E1 -QUALIFICATION INFORMATION AND ASSIGNED Engineers • Surveyors • Subsurface Utility Engineering 30 Subsurface Imaging • Utility Coordination WASTEWATER LIFT & PUMP STATION PROJEClS •City of Margate -Uft Station No. 7 Rehabllltatlon, Margate, Florida Status: On-Hold as per Owner/Client's Request (Design Complete) Prime Consultant: CAS PERSONNEL• Key CAS Staff: James Orth, Greg Giarratana, Keith Schriner, Robert Keener, James F. Driscoll, Tony GomesScope of Work: Survey, design, preparation of construction plans and contract documents, permitting, bidding assistance, construction management and limited construction observation through project closeout/start-up services for the decommissioning the existing wet pit/dry pit lift station and converting to a duplex submersible station along with the installation of a new wetwell and valve vault. In addition, the installation of all stainless steel piping inside the proposed wet well, relining existing structures, force main replacement, new water service line and backflow preventer, fencing, and upgrading the electrical equipment including control panel and SCADA system. This project is a continuation of a design that was started in 2008 and CAS was tasked to update the design plans to current standards. Design was completed on time and within budget. Pro/ect Challenges & Approach: This project consists of retrofitting the existing dry can wetwe/1 into a terminal sewer manhole and installing a new wetwe/1 within a congested utility area and nearby overhead powerlines. A tremie-pour installation may be the preferred method of wetwe/1 construction for this project. Design Cost: $54,932 Construction Cost Estimate: $ 560,000 •City of Margate -East WWTP Dumping Station Rehabllltatlon, Margate, Florida Status: On-Hold as per Owner/Client's Request (Design Complete) Prime Consultant: CAS Key CAS Staff: James Orth, Greg Giarratana, Keith Schriner, Robert Keener, James F. Driscoll, Tony GomesScope of Work: Survey, design, preparation of construction plans and contract documents, permitting, bidding assistance, construction management and limited construction observation through project closeout/start-up services for the replacing/rehabilitation of the City's existing vacuum truck decant dumping station for storm, sewer and soft dig wastes. The project included a report outlining the different options, demolition of the existing site, utility research within the plant and improvements to the existing conveyance system. Design was completed on time and within budget. Pro/ect Challenges & Approach: The project scope entails retrofitting of the existing pump station. Close coordination with the City's Plant Operator will be essential during the design process, 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 � Craig A. Smith & Associates, Inc. Engineers • Surveyors • Subsurface Utility Engineering 30 Subsurface Imaging • Utility Coordination SECTION E1 -QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL because record drawings for the project area are outdated and Incomplete. In addition, existing soil conditions are not conducive to the use of GPR or other radar scanning equipment for locating buried utilities. Design Cost: $62,239 Construction Cost: TBD •City of Margate -East WWTP Triplex Uft Station Reha bilitation, Margate, Florida Status: On-Hold as per Owner/Client's Request (Design Complete) Prime Consultant: CAS Key CAS Staff: James Orth, Greg Giarratana, Keith Schriner, Robert Keener, James F. Driscoll, Tony GomesScope of Work: Survey, design, preparation of construction plans and contract documents, permitting, bidding, construction management and limited construction observation through project closeout/start-up services for the removal and replacement of the station's existing pumps, checks, valves and control panel. Design was completed on time and within budget. Pro/ect Challenges & Approach: The project scope entails retrofitting of the existing pump station. Close coordination with the cit y's plant operator will be essential during the design process, because record drawings for the project area are outdated and incomplete. In addition, existing soil conditions are not conducive to the use of GPR or other radar scanning equipment for locating buried utilities. Design Cost: $53,619 Construction Cost: $ TBD •City of Margate -Uft Station No.21 Rehabilitation, Margate, Florida Status: Completed 2020 Prime Consultant: CAS Key CAS Staff: James Orth, Greg Giarratana, Keith Schriner, Robert Keener, James F. Driscoll, Tony GomesScope of Work: Survey, design, preparation of construction plans and contract documents, permitting, bidding, construction management and limited construction observation through project closeout/start-up services for the decommissioning the lift station's existing dry pit and retrofitting the existing wet pit into a duplex submersible lift station with above ground valves and piping; including the installation of a retaining wall, relining existing structures, FOOT MOT, new water service line and backflow preventer, fencing, and upgrading the electrical equipment incl uding control panel and SCADA system. Pro/ect Challenges & Approach: This project consisted of a lift conversion from a wet pit/dry pit to a submersible type station within a limited easement area and low overhead powerlines. Therefore, the design was modified to include above-grade piping, valves and fittings and the re­ use of the existing wetwe/1. Design Cost: $60,990 Construction Cost: $ 298,216 •Spring Lake Improvement District - Wastewater Treatment Plant Duplex Sanitary Sewer Lift Station, Sebring, Florida Status: Completed 2019 Prime Consultant: CAS Key CAS Staff: James Orth, Greg Giarratana, Keith Schriner, Robert Keener, James F. Driscoll, Michael JonesScope of Work: Survey, design, preparation of construction plans, contract documents, permitting, bidding, construction management and SRF funding assistance and administration through 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.cralgasmith.com • LB3110 � Craig A. Smith & Associates, Inc. Engineers • Surveyors • Subsurface Utility Engineering 3D Subsurface Imaging • Utility Coordination SECTION E1 -QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL project closeout/start-up services for the construction of a new 15 HP duplex submersible lift station rated at 510GPM @ 67 TOH with SCADA system and backup power generator to service the new Wastewater Treatment Plant. The project was 100% SRF funded. This project was completed on time and within budget. Design Cost: $60,000 Construction Cost: $250,000 •City of Margate -Uft Station No.22 Rehabllltatlon, Margate, RorldaStatus: Completed 2017 Prime Consultant: CAS Key CAS Staff: James Orth, Greg Giarratana, Keith Schriner, Robert Keener, James F. Driscoll, Tony Gomes Scope of Work: Survey, design, preparation of construction plans and contract documents, permitting, bidding, construction management and limited construction observation through project closeout/start-up services for the decommissioning the existing wet pit/dry pit lift station and converting to a duplex submersible station along with installation a new wet well and valve vault. In addition, the installation of all stainless steel piping inside the proposed wet well, relining existing structures, manholes, gravity sewer, fencing, upgrading the electrical equipment, control panel and installation of a SCADA system.Design Cost: $18,488 Construction Cost: $571,667 •Bal Harbour VIiiage -Wastewater Pump Station No. 3 and Gravity Sewer Improvements, Bal Harbour, Florida Status: Completed 2017Prime Consultant: CAS Key CAS Staff: Stephen C. Smith, William H. Landis, Greg Giarratana, Al Caruso, James F. Driscoll, Robert Keener, William Tanto Scope of Work: Survey, utility locates, design, permitting, preparation of construction plans, cost estimates, contract documents, assistance during bidding, construction management and certification through project close-out for the installation of a new triplex submersible pump station with a 12-foot diameter wetwell with electrical controls building and approximately 1,350 linear feet of 18" gravity sanitary sewer. This project was partlally grant funded and was completed on time and within budget.Design Cost: $147,860Construction Cost: $1.985,000 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 � Craig A. Smith & Associates, Inc. Engineers • Surveyors • Subsurface Utility Engineering 3D Subsurface Imaging • Utility Coordination SECTION E1 -QUALIFICATION INFO RMATION AND ASSIGNED PERSONNEL. SURVEYING & UTILITY LOCATING PROJEClS tr •City of Delray Beach -Lowson Boulevard Roadway & Drainage Improvements, Delray Beach, Florida Status: Completed 2019 Prime Consultant: Kimley-Horn & Associates, Inc. Subconsultant: CAS Key CAS Staff: Stephen C. Smith, James F. Driscoll, David Lookabill, Robert KeenerScope of Work: Survey of all above ground visible improvements and utilities within the right-of­ way of Lowson Boulevard (SW 10th Street) and 10 feet beyond the right-of-way line from the east right-of-way of Congress Avenue to the intersection of SE 6th Avenue. In addition, rims, pipe invert elevations, sizes and pipe materials were acquired for all existing drainage structures within the project limits. Subsurface utility engineering included soft digs at fifty (50) designated locations to verify depths, sizes and materials of conflicting buried utilities. This project was completed on time and within budget. Project Cost: $58,550 •City of West Palm Beach -East Central Regional Water Reclamation Faclllty Record Drawing Updates, West Palm Beach, Florida Status: Completed 2019 Prime Consultant: Hazen & Sawyer, Inc. Subconsultant: CAS Key CAS Staff: Stephen C. Smith, James F. Driscoll, Robert Keener, David Lookabill, Donald DrakeScope of Work: Surveyed to establish horizontal control, benchmarks and locating all pertinent above ground visible improvements and utilities within the project area. Utility surface designation and mapping was performed utilizing 2D Ground Penetrating Radar, 3D Radar Tomography scanning and calibration soft digs for approximately 260,000 ft2 of the facility to identify types, sizes and locations of buried utilities. Deliverables included full electronic files containing CAD, survey data and imagery collected and scanning performed for this project. All files were compatible with the Civil 3D CADD platform. This project was completed on time and within budget. Project Cost: $36,330 •Seacoast Utility Authority -Northlake Boulevard Water & Force Main Replacement Project - Phase �II, Palm Beach Gardens, Florida Status: Completed 2018 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 � Craig A. Smith & Associates, Inc. Engineers • Surveyors • Subsurface Utility Engineering 3D Subsurface Imaging • Utility Coordination Prime Consultant: Hazen & Sawyer, Inc. Subconsultant: CAS SECTION E1 -QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL Key CAS Staff: Stephen C. Smith, James F. Driscoll, Robert Keener, David Lookabill, Donald Drake Scope of Work: Performed surveying, mapping and utility locating and provide a pre-design survey for 3 phases of a water distribution and sewer force main piping replacement project. CAS performed a complete right-of-way survey which included all existing above-ground/below-ground utilities, easements, trees, landscaping, property ownership and utility poles and wires. The project included 1.3 miles of Northlake Boulevard from Old Dixie Highway (SR 811) in Phase 1, 1 mile of US Highway 1 from Northlake Boulevard south to Silver Beach Road in Phase 2, and 1.7 miles of US Highway 1 from Northlake Boulevard north to the North Palm Beach waterway in Phase 3. 3D laser scanning was utilized to accurately capture point clouds in order to re-create all surface objects. This project was completed on time and within budget. Project Cost: $203,325 •Sunshine Water Control Dis trict West Outfall canal Survey -Phase 1A, 1C & 2, Coconut Creek, Florida Status: Completed 2017 Prime Consultant: CAS Key CAS Staff: Gene R. Schriner, Robert Keener, James F. Driscoll Scope of Work: CAS prepared 1.89 miles of topographic and route survey for the development of engineering dredging plans. CAS performed a complete survey beyond the limits of the canal's 170-foot right-of-way including 100-foot cross sections for canal depth, utility locations, elevations, trees and landscaping, and bridge pile configurations at Coral Springs Drive and Pump Station No. 2.This project was completed on time and within budget. Pro!ect Cost: $45,032 •Mlaml-Oade Public Housing & Communi ty Development -Elizabeth Vlrrlck Public Housing Project -Phase I & II, Miami-Dade County, Florida Status: Completed 2017 Prime Consultant: CAS Key CAS Staff: Stephen C. Smith, James F. Driscoll, Robert Keener, David Lookabill Scope of Work: Provided field and office surveying services to produce a map of boundary and topographic survey for Public Housing and Community Development Elizabeth Virrick I and II public hou sing units. The scope of work included survey of all above ground, visible improvements with pertinent elevations to 25 feet beyond each property line, on-site elevations relative to the North American Vertical Datum (NAVO) of 1988 were collected on a minimum 50-foot grid, generation of 1-foot surface contours, trees 4" of greater were located and shown with their caliper sizes at breast height (ABH), outlines of onsite hedges and brush areas were located and shown, surface elevations adjacent to trees were shown, drainage and gravity sewer structure information was collected including pipe size, inverts, material and direction as available. Also crown elevations were gathered along each adjacent road at approximately 50-foot intervals. Utility locates were also performed to verify location of buried utilities within the project area. The survey was conducted relative to the Florida Minimum Technical Standards as defined by chapter MTS SJ-17, Florida Administrative Code. This project was completed on time and within budget. Protect Cost: $9,266.17 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 � Craig A. Smith & Associates, Inc. Engineers • Surveyors • Subsurface Utility Engineering 3D Subsurface Imaging • Utility Coordination SECTION E1 -QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL •Palm Beach County Water Utllltles Department -Lake Region Water Treatment Plant (No. U) Subsurface Utility Engineering (SUE), Palm Beach County, Florida Status: Completed 2015 Prime Consultant: Baxter & Woodman, Inc. (former Mathews Consulting) Subconsultant: CAS Key CAS Staff: Stephen C. Smith, James F. Driscoll, Robert Keener Scope of Work: Survey and subsurface utility engineering to locate existing utilities at water treatment plant site for record drawing updates. Utility locates included establishing benchmarks, horizontal control, depth, size, material and utility type including updated utility record drawings. This project was completed within budget though there were delays in completion due to misinformation provided by the owner reg arding the soil conditions in the project area. (Muck within the project area was not removed as stated by the owner therefore locating of the buried utilities could not be accomplished by 20 or 30 radar scanning and thus extensive vacuum soft digs was required).Proiect Cost: $74,928 *CAS provided the professional surveying services necess ary for the successful design and construction of all the water distribution, sanitary sewer system, pump/lift station, stormwater/drainage and roadway projects listed in this section and the SF 330 Forms in Section E2. 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 � Craig A. Smith & Associates, Inc. Engineers • Surveyors • Subsurface Utility Engineering 3D Subsurface Imaging • Utility Coordination SECTION E1 -QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL STORMWATER/DRAINAGE & ROADWAY PROJECTS •City of Pompano Beach -SW 2 nd Street Drainage Improvements, City of Pompano Beach, Florida Status: On-going (Design 100% Complete, Bidding Phase in Progress -Awaiting SRF Funding) Prime Consultant: CAS Key CAS Staff: Stephen C. Smith, Frank Vilar, Robert D. Keener, Tony Gomes Scope of Work: Engineering services for proposed drainage along SW 2 nd Street between Dixie Highway and Cypress Road, SW 1st Avenue between SW 2 nd Street and Atlantic Blvd. CAS met with City of Pompano Beach to discuss City concerns with flooding at the described project limits and identify potential solutions. It is anticipated the proposed drainage improvements could include a combination of new swale systems and new exfiltration trenches where feasible and utilization of existing stormwater outfalls. The project scope is limited to implementation of new stormwater management systems and does not include major roadway re-grading or full reconstruc tion. CAS services include surveying, utility locates services, engineering design, permi tting, bidding and negotiating services, construction management services and final certifications through project closeout.Pro/ect Challenges & Approach: The project's existing site conditions include low site grade elevations, lack of available land space and low soil permeability rates making it challenging to implement new stormwater management design elements such as swales, retention areas and exfiltration trench. Additional challenges included congested corridors with various existing utilities that make it difficult to accommodate proposed exfiltration trenches within the road right of ways. The project design approach included maximizing offsite discharge rates to maximum allowable rates using two existing outfalls, creating new swale areas and implementing exfiltration trenches to the greatest extent possible. The design also included improving stormwater conveyance by expanding the current drainage system to encompass the entire drainage areas through new interconnected catch basins and utilization of both existing stormwater outfalls. Design Cost: $143,833 Construction Cost Estimate: $750,000 •Town of Pembroke Park -SW 25th Street Stormwater Improvements, Pembroke Park, Florida Status: On-going (Bidding Phase) Prime Consultant: CAS Key CAS Staff: Stephen C. Smith, Frank Vilar, Robert D. Keener, Tony Gomes, William Tanto Scope of Work: Multi-phase stormwater improvement project totaling 14.34 acres. Project scope includes survey, hydraulic modeling, design, construction contract development and bidding services for Phase I and II which was a 2.44 acre drainage sub basin area. The purpose of the 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 @@ Craig A. Smith & Associates, Inc. Engineers • Surveyors • Subsurface Utility Engineering 3D Subsurface Imaging • Utility Coordination SECTION E1 -QUALi Fl CATION INFORMATION AND ASSIGNED PERSONNEL. project was to alleviate flooding in the Town of Pembroke Park by improving hydraulic conveyance throughout the existing stormwater drainage system serving the 14.34 acre study area. A hydraulic analysis to determine the acceptable level of service to the Town was performed by the development of an ICPR model for the project area. In order to develop the ICPR model, a comprehensive review of existing survey and utility information, available record drawings, aerial photography and field investigations were performed. After the model was completed, proposed recommendations were made for upsizing the existing stormwater drainage pipes by analyzing the ICPR results for reduction in peak stages and flood duration times in the pre and post conditions. Existing discharge pipes are proposed to be upsized from 24" to new 54" diameter drainage pipes. Design Cost: $79,000 Construction Cost Estimate: $275,000 (Phase I & II} •City of Belle Glade -2019 Road Resurfacing and Slgnage Upgrades (SCOP), Belle Glade, Florlda Status: Completed 2019 Prime Consultant: CAS Key CAS Staff: James R. Orth, Keith Schriner, William TantoScope of Work: The project consisted of roadway improvements on 25 roads city-wide totaling approximately 6.4 miles and includes milling and resurfacing, pavement overlays, pavement marking and signage improvements. Professional services included design, permitting, bidding assistance and construction oversight. The project was funded by the FOOT Small County Outreach Program (SCOP}. This project was completed on time and within budget. Design Cost Clncludlng Construction Oversight}: $85,000 Construction Cost: $1,506,991 •City of Belle Glade -Orange Avenue Clrcle Roadway Improvements Belle Glade, Florida Status: Completed 2019 Prime Consultant: CAS Key CAS Staff: Gene R. Schriner, James R. Orth, Keith Schriner, Al Caruso, Robert Keener, James F. Driscoll Scope of Work: Provide survey, utility locates, engineering design and bidding assistance for roadway improvements to the Orange Avenue Circle Access Road from State Road 15 (Main Street} west approximately 1,200 linear feet and provide proper connect ions at all connecting streets. The proposed roadway will be a two-lane facility west of the FEC railroad tracks with 24 feet of pavement for two (2) 12-foot driving lane surfaces tapering from two lanes to three lanes east from the railroad tracks to Highway US 98 including a turning lane at State Road 15 and 4 feet of shoulder on each side. CAS successfully acquired a FOOT driveway connection permit for modifications to the existing access driveway. Design included drainage culverts. This project was completed on time and within budget. Design Cost: $59,600 Construction Cost: $295,000 •City of Belle Glade -SW 3rd Street Drainage Improvements, Belle Glade, Florlda Status: Completed 2018 Prime Consultant: CAS Key CAS Staff: James R. Orth, Keith Schriner, William TantoScope of Work: The project consisted of removal and replacement of existing failing catch basins and CMP drainage pipes on approximately 350 linear feet of roadway in the downtown Belle Glade area. This project was completed on time and within budget. Design Cost {lncludlng Construction Oversight}: $57,800 Construction Cost: $294,486 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 � Craig A. Smith & Associates, Inc. Engineers • Surveyors • Subsurface Utility Engineering 3D Subsurface Imaging • Utility Coordination SECTION E1 -QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL•· •City of Moore Haven -Avenue R Stormwater Improvements, Moore Haven, Florida Status: Completed 2018 Prime Consultant: CAS Key CAS Staff: Gene R. Schriner, Orlando Rubio, Robert D. Keener, James F. Driscoll Scope of Work: Survey, utility locates, design, preparation of construction plans and contract document development, permitting, bidding, construction management, construction observation through project closeout/start-up services for the installation of 1,200 linear feet of plastic swale liner (1/4 section of 12-inch ID smooth inner wall perforated black P.E. pipe}, 350 linear feet of PVC culverts, ten (10} concrete headwalls, one (1) drainage structure, 4,000 square yards of SOD and the regarding of 4,000 square yards of swale. The project also involved the relocation of existing utilities. This project was 100% grant funded and completed on time and within budget. Design Cost Clncludlng Construction Management): $94,290 Construction Cost: $393,304 •City of Sunny Isles -174th Street Stormwater & Pavement Improvements, Sunny Isles Beach, Florida Status: Completed 2017 Prime Consultant: CAS Key CAS Staff: Stephen C. Smith, Orlando Rubio, Robert D. Keener, Tony Gomes Scope of Work: Survey, utility locates, design, stormwater modeling, cost estimating, contract document devel opment and permitting for road and drainage improvements along 17 4th Street which included reconstruction of existing roadway and drainage with a Hydrodynamic Separator (Downstream Defender) for water quality treatment and a Tideflex Checkmate Valve for tidal backflow prevention purposes, bike lanes, curbing, landscaping, parallel parking and traffic calming. The project achieved improved drainage and road pavement, reduction in traffic speed, enhanced pedestrian safety and street aesthetics. The project schedule was extended due to owner Initiated change orders In the amount of $765,536.13. Design Cost: $21 2,180 Construction Cost: $3,682,392 •Town of Pembroke Park -SW 31st Avenue Stormwater Improvements, Pembroke Park, Florida Status: Completed 2016 Prime Consultant: CAS Key CAS Staff: Stephen C. Smith, Frank Vilar, Robert D. Keener, Tony Gomes, William Tanto Scope of Work: Survey and design of a stormwater management system to serve an existing 1.2 acre commercial/residential flood prone area in the Town of Pembroke Park. Proposed improvements included 2,050 linear feet of roadway improvements by re-grading the existing roadway from a crowned road to an inverted crown section and included addition of approximately 1,800 linear feet of exfiltration trench. Additional project related responsi bilities included pavement marking & signage, permitting, cost estimating and preparation of the construction contract documents and bidding services. Construction services were also provided and included shop drawing reviews, review and approval of pay requests, general construction management, field inspections to review Contractor installation of proposed work and final certification to all regulatory agencies through project close-out. This project was completed on time and within budget. Design Cost: $56,000 Construction Cost: $565,000 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 � Craig A. Smith & Associates, Inc. Engineers • Surveyors • Subsurface Utility Engineering 3D Subsurface Imaging• Utility Coordination SECTION E1 -QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL •Glades Cou nty -Kirby Thompson Roadway & Drainage Improvements, Moore Haven, Rorlda Status: Completed 2016 Prime Consultant: CAS Key CAS Staff: Gene R. Schriner, Robert D. Keener Scope of Work: Survey, design, contract document development, permitting, bidding, construction management and observation through project close-out for roadway resurfacing, drainage and striping for approximately four (4) miles along Kirby Thompson Road from the Hendry County line to County Road 720. CAS utilized a new state-of-the-art design saving money and time through the use of "Full Depth Reclamation", a process which is cost effective, providing a stronger pavement with a longer life. This project was completed on time and within budget. Design Cost (Including Construction Management): $195,610 Construction Cost: $1,679,114 •City of Belle Glade -2016 Road Resurfacing and Safety Upgrades (SCOP), Belle Glade, Florida Status: Completed 2016 Prime Consultant: CAS Appllcable Professional categories RFO 18-19-405: 119 Key CAS Staff: Stephen C. Smith, Frank Vilar Scope of Work: The project areas totaled approximately 10,800 linear feet of roadway improvements which included milling and resurfacing, pavement reconstruction, pavement overlays, sidewalk installation, guardrail improvements and pavement marking and signage improvements. Professional services included design, permitting and preparation of bid documents. The project was funded by the FOOT Small County Outreach Program (SCOP) for road improvements at 6 different locations in City of Belle Glade. This project was completed on time and within budget. Design Cost: $206,954 •City of Belle Glade -SE Avenue K Roadway and Drainage Improvements, Belle Glade, Florida Status: Completed 2015 Prime Consultant: CAS Key CAS Staff: Gene R. Schriner, Robert D. Keener Scope of Work: The project consisted of survey, design and contract document development for a quarter-mile of roadway reconstruction pavement resurfacing, drainage pipe upgrades, swale restoration, striping and signage. Professional services included survey, engineering design and development of construction plans, cost estimates, preparation of bid schedule and bidding assistance. Design Cost: $37,340 •City of Belle Glade -NW Avenue H Roadway and Drainage Improvements, Belle Glade, Florida Status: Completed 2015 Prime Consultant: CAS Key CAS Staff: Gene R. Schriner, Robert D. Keener Scope of Work: The project consisted of survey, design and contract document development for a half-mile of roadway reconstruction pavement resurfacing, drainage pipe upgrades, swale restoration, striping and signage. Professional services included survey, engineering design and development of construction plans, cost estimates, preparation of bid schedule and bidding assistance. Design Cost: $48,725 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 � Craig A. Smith & Associates, Inc. Engineers • Surveyors • Subsurface Utility Engineering 3D Subsurface Imaging • Utility Coordination SECTION E1 -QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL •City of Moore Haven Stonnwater System Improvements, Moore Haven, Florida Status: Completed 2015 Prime Consultant: CAS Key CAS Staff: Gene R. Schriner, Orlando Rubio, Robert D. Keener, James F. Driscoll, William TantoScope of Work: Planning, survey, utility locates, design, permitting bidding assistance and construction management and inspection services for The Ranch Lakes Estates Improvements Project for the City of Moore Haven which consisted of the construction of a gravity stormwater drainage system along with two master stormwater pump stations including force mains and canal dredging. Construction included the installation of 7,103 linear feet of HDPE drainage pipe ranging in diameter from 15-inch to 48-inch, 1,044 linear feet of force main, 76 drainage structures and two duplex stormwater pump stations. This project was completed on time and within budget. Design Cost Clncludlng Construction Management): $271,175 Construction Cost: $2,031,000 •City of Miami Beach - Palm & Hibiscus Islands Infrastructure Improvements Project, City of Miami Beach, Florida Status: Completed 2015 Prime Consultant: Wade Trim Associates, Inc. Subconsultant: CAS Key CAS Staff: Stephen C. Smith, Orlando Rubio, Tony GomesScope of Work: Drainage, roadway and stormwater pump station design, preparation of construction plans for design-build team, permitting, coordination with team members, construction observation through project closeout for infrastructure improvements consisting of water main upgrades, utility relocation, new drainage systems with three (3) stormwater pump stations along with Hydrodynamic Separators (Downstream Defenders) for water quality treatment and Tideflex Checkmate Valves for tidal backflow prevention purposes, landscaping and roadway reconstruction to address sea level rise. This project was completed on time and within budget. Design Cost: $194,000 Construction Cost: $8,000,000 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 � Craig A. Smith & Associates, Inc. Engineers • Surveyors • Subsurface Utility Engineering 3D Subsurface Imaging • Utility Coordination SECTION E1 -QUALi Fl CATION INFORMATION AND ASSIGNED PERSONNEL WATER RESOURCE & STORMWATER/SANITARY SEWER MASTER PLANNING PROJECTS •City of Pompano Beach Non-Sewer Area C Sanitary Sewer Study, Pompano Beach, Rorlda Status: Completed 2019 Prime Consultant: CAS Kev CAS Staff: Stephen C. Smith, Frank Vilar, Robert D. KeenerScope of Work: CAS prepared an engineering design report to explore the various options available for providing sewer service to approximately 62 acres comprising of a light industrial/small commercial area where a number of the properties have little or no access to public streets and limited right-of-way for the installation of a sanitary sewer system. The work included survey of approximately 1,400 linear feet of the subject area and utilized GPS equipment of data collection in both the horizontal and vertical planes creating a basemap of the project area with building floor, road and parking lot elevations. Based on the findings and data collected CAS prepared a report outlining design criteria, assumptions, baseline data, project cost estimates and included a summary of the findings with proposed design alternatives clearly outlined with exhibits. The Sanitary Sewer Study was completed on time and within budget. Pro!ect Cost: $44,540 •Sunshine Water Control District West Outfall canal Improvements -Phase I & 1A, Coconut Creek, Rorlda Status: Completed 2017 Prime Consultant: CAS Kev CAS Staff: Gene R. Schriner, Orlando Rubio, Robert D. KeenerScope of Work: The West Outfall Canal is the primary conveyance canal for the Sunshine Water Control District's west basin serving 3,361-acres. The dredging project improved stormwater conveyance to Pump Station No. 2 by widening and deepening the existing canal to improve flood protection to the West Basin. The project entailed the removal of 19,500 cubic yards of material to the targeted bottom elevation for the entire canal. The channel modifications improved conveyance and allowed the pump station to perform more efficiently by reducing headloss in the canal. Phase I of the project included dredging 2,900 linear feet of the overall 10,200 linear feet West Canal. The project also included public outreach with individual homeowners to remove encroachments within the canal right-of-way. This project was completed on time and within budget. Design Cost: $175,000 Construction Cost: $3,000,000 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 � Craig A. Smith & Associates, Inc. SECTION E1 -QUALIFICATION INFORMATION AND ASSIGNED Engineers • Surveyors • Subsurface Utility Engineering 3D Subsurface Imaging • Utility Coordination PERSONNEL •Sprtng lake Improvement District Stormwater Treatment Area Project, Sebring, Florida Status: Completed 2017 Prime Consultant: CAS Key CAS Staff: Gene R. Schriner, Orlando Rubio, Robert D. KeenerScope of Work: Survey, design, stormwater modeling, cost estimating, contract document development and permitting for the construction of a 70 acre stormwater treatment area (STA) to provide additional water quality treatment benefits prior to discharging into Arbuckle Creek and provide added storage during rain events thus reducing flooding. Secured grants for this project were as follow: State Appropriation $416,000 and two 319 FDEP grants $1,250,000. The projectwas completed on time and within budget. Design Cost: $462,560Construction Cost: $3,304,579 •VIiiage of El Portal Sanitary Sewer Master Plan, El Portal, Florida Status: Completed 2017 Prime Consultant: CAS Key CAS Staff: Stephen C. Smith, Orlando Rubio, Greg Giarratana, Al Caruso, Robert D. KeenerScope of Work: The Sanitary Sewer Master Plan was a comprehensive report to define prior ity areas and determined corrective actions required to convert from a decentralized wastewater treatment system (septic system) to a new sanitary sewer gravity collection system with lift stations. The Master Plan also included a comprehensive survey base map for the entire village, hydraulic sewer modeling and the overall design of eighteen phases of construction. The sanitary sewer systems were developed using best management practices, current levels of service, and investigated various funding sources. The Master Plan was completed on time and within budget. Project Cost: $75,000 •Village of Biscayne Park Stonnwater Master Plan, Biscayne Park, Rorlda Status: Completed 2016 Prime Consultant: CASKey CAS Staff: Gene R. Schriner, Orlando Rubio, Albert J. Caruso, Robert KeenerScope of Work: The Stormwater Master Plan was a comprehensive report to define priority areas, determined corrective actions required to resolve flooding conditions and established a level of service. The Master Plan also included a comprehensive survey base map for the entire village including stormwater modeling and the design of five stormwater networks that would take into account future sea level rising. The stormwater systems were developed using best management practices while addressing water quality and water quantity concerns. The estimated total cost of the village's stormwater improvements were estimated at $13.08 Million. The Master Plan was completed on time and within budget.Project Cost: $134,500 .. ' . . _,,-� � ... te,.....,,� 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 � Craig A. Smith & Associates, Inc. Engineers • Surveyors • Subsurface Utility Engineering 3D Subsurface Imaging • Utility Coordination SECTION E1 -QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL •Bal Harbour VIiiage Stormwater Master Plan, Bal Harbour, Florida Status: Completed 2015 Prime Consultant: CAS Key CAS Staff: Stephen C. Smith, William H. Landis, Albert J. Caruso, Orlando Rubio, James F. Driscoll, Robert KeenerScope of Work: A comprehensive CIP project within the Village included roadway and stormwater elements that identified and determined corrective actions required to resolve existing flooding conditions throughout the Village. The Master Plan included preliminary survey and calculations, drainage and roadway design that would take into account future sea level rising, and preliminary cost estimates in the development of new stormwater systems, through best management practices, while addressing water quality and water quantity concerns. The estimated total cost of Village-wide road and stormwater improvements was $15.9 Million. The Master Plan was completed on time and within budget. Pro!ect Cost: $136,675 *Please refer to Section E2 -Prime Consultant SF330 Forms for further project experience information. 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 � Craig A. Smith & Associates, Inc. Engineers • Surveyors • Subsurface Utility Engineering 3D Subsurface Imaging • Utility Coordination KEY CAS PERSONNEL EXPERIENCE MANAGEMENT & ADMINISTRATION Stephen C. Smith, P.E., President/CEO. Mr. Smith's responsibilities include management of daily business operations for 40+ member civil engineering and surveying firm with gross sales of $5.5+ million. Oversee all areas of business including engineering, surveying, construction management services, accounting and human resources. He ensures proper allocation of resources, staffing, financial management, quality control and timely project completion. Mr. Smith managed the survey, utility locating, design and construction of approximately 15,000 linear feet of 6"-12" water mains for the Town of Golden Beach as part of a complete retrofit of the town's entire existing water distribution system. In addition, Mr. Smith was responsible for the master planning, project management, resource allocation and quality assurance of the stormwater design, as well as the project management of stormwater construction projects for the City of Sweetwater, Miami-Dade and the City of Oakland Park. He has extensive experience in the design and management of roadway improvement projects as well. Mr. Smith was responsible for the Andrews Avenue Widening and Intersection Improvements in Broward County and roadway widening and intersection improvements for Biscayne Boulevard from NE 163rd Street to 203 rd Street (along with stormwater improvements) and the 174th Street Stormwater and Pavement Improvements for the City of Sunny Isles Beach. Mr. Smith completed a Bachelors of Science in Civil Engineering & Building Construction from Auburn University. He wlll be the Prlnclpaf.ln-Charge, client llalson and wlll be ensuring that the necessary resources and staff are provided for each assigned project throughout the duration of the contract. ENGINEERING Orlando Rubio, P.E., Senior Supervising Engineer, will serve as the Project Manager. Mr. Rubio has over 30 years of experience as a project manager and designer in water resource engineering related various surface water management systems and roadway improvements. Mr. Rubio is responsible for the development of project scopes, overall project management, engineering design, stormwater master plans, State & Federal Grant applications, advanced stormwater modeling using ICPR, Hydraflow, & HEC-RAS modeling software programs, and engineering services during construction. Mr. Rubio also conducts field and office visits with clients, permitting agency staff, and other project coordination as necessary. In the past, Mr. Rubio has worked for regulatory agencies at the county and state level in South Florida. Mr. Rubio has extensive experience reviewing complex surface water management license applications consisting of administrative and legal data, engineering reports, computer program output and construction plans. Mr. Rubio conducted reviews in accordance with established criteria, engineering principles, and normal construction practices to produce technical engineering reports related to stormwater/drainage projects. Mr. Rubio coordinated reviews with the SFWMD, FDEP and/or County agencies and the delegation of the Environmental Resource Permitting program for Broward County from SFWMD and FDEP. Mr. Rubio's extensive stormwater design exp erience in South Florida includes both gravity and pumped drainage systems. He was responsible for the design, permitting and construction management of the NE 174th Street Roadway and Drainage Improvements project for the City of Sunny Isles Beach. He has earned a Bachelors of Science in Civil Engineering from the University of Florida. Mr. Rubio wlll provide stormwater/dralnage and roadway engineering design, permitting, hydraulic modeling and construction management services along with overall project managemenVcoordlnatlon for all assigned projects on an as-need basis. Frank VIiar, P.E., Senior Supervising Engineer. Mr. Vilar has over 23 years of professional experience managing and designing numerous public and private sector utility/infr astructure projects throughout 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 Craig A. Smith & Associates, Inc. SECTION E1 -QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL roadway Senior Supervising Engineer. Al Project Engineer, 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 � Craig A. Smith & Associates, Inc. Engineers • Surveyors • Subsurface Utility Engineering 30 Subsurface Imaging • Utility Coordination SECTION E1 -QUALIFICATION •· INFORMATION AND ASSIGNED :. PERSONNEL •· feasibility studies for projects including bidding services and close-out packages. He also is responsible for project coordination with clients, municipalities, permitting agencies and contractors to ensure that projects meet their budget goals and are completed within the scheduled timeframe. In addition, Mr. Caruso has extensive experience in developing utility master plans and providing technical reporting to regulatory agencies for water and sewer projects. Mr. Caruso also has extensive experience in document preparation for grant funding assistance. He retains an Associates Degree in Engineering Technology from Middlesex County College. Mr. caruso wlll provide any addltlonal design support, technical report writing and grant administration assistance (as needed) for the duration of the contract. Keith Schriner, Design/Field Engineer. Mr. Schriner received a degree of Bachelor of Science in Civil Engineering from the University of Central Florida with focus in water resources. Mr. Schriner has been responsible for the design and construction management of several wastewater lift stations at the City of Margate, Hardee County's Wauchula Hills Gravity Sewer Extension Project -Phase V, City-County Public Works Authority (CCPWA) -Avenue R & 4™ Street Sanitary Sewer Extension consisting of 2,550 linear feet of 8" gravity sanitary sewer including seven (7) manholes and Spring Lake Improvement District Wastewater Treatment lift station and force installation. Mr. Schriner also provided technical support for an SRF funding application for over $2 million associated with the City of Lake Worth Beach's Lake Osborne Estates Water Main Replacement Project which entails the replacement of over 16,000 linear feet of old asbestos concrete and galvanized steel water mains. Mr. Schriner wlll be providing design, pennlttlng and construction management services for water distribution systems, wastewater conveyance/collectlon systems and granVtoan funding assistance support. SURVEY & MAPPING Robert D. Keener, P.S.M., Vice President of Surveying, has been licensed in the State of Florida for 22 years and with over forty (40) years of surveying experience in utility design, construction and master planning. As Vice President of the CAS Survey Division, Mr. Keener heads a qualified survey staff that includes both CADD and field personnel. His staff is proficient with the latest survey technology available to the industry. Mr. Keener will serve as Principal Surveyor for all surveys and will coordinate all survey activities with various disciplines as needed. All utility related components such as 2D Ground Penetrating Radar, 3D Radar Tomography, Utility Surface Mapping, Utility Excavations, etc. will be certified by Mr. Keener. Mr. Keener holds a Florida Surveyors and Mappers License and is a member of the Florida Surveying and Mapping Society of Florida. Mr. Keener wlll be responslble for coordinating all surveying and mapping efforts for the duration of the contract. CADD Mike Marenco, CADD Manager, has 15 years of experience in computer aided design and drafting as it applies to survey, engineering and utility construction fields. Mr. Marenco is responsible for managing the CADD staff and ensuring deadlines for engineering or survey basemap plans are met. Mr. Marenco is also proficient in preparing detailed drawings, layouts, exhibits, topographical maps, and graphic representations of survey information as well as engineering projects such as water distribution, sewer collection, paving and drainage systems. Mr. Marenco wlll be responslble for coordinating with the engineering and survey staff for all drafting.related tasks for the duration of the contract. CONSTRUCTION INSPECTION Tony Gomes is a Senior Field Representative. Mr. Gomes has over 40 years experience and provides assistance to the Project Engineer for the inspection of work accomplished and materials furnished by 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 � Craig A. Smith & Associates, Inc. Engineers • Surveyors • Subsurface Utility Engineering 3D Subsurface Imaging • Utility Coordination SECTION E1 -QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL contractors, with specialized expertise in utility pipeline (water and wastewater), roadway, drainage and bridge construction. Mr. Gomes wlll be providing cons truction Inspection services for the duration of the contract. Wllllam Tanto is a Project/Field Utility Coordinator. Mr. Tanto provides assistance to the Project Engineers for the inspection of work accomplished and materials furnished by the contractor with specialized expertise in utility pipeline (water and wastewater), roadway, drainage and bridge construction. Mr. Tanto wlll be providing construction Inspection services for the duration of the contract. SUBSURFACE UTILnY ENGINEERING {lJTILnY LOCATES) James F. Drlscoll is the Director of Subsurface Utility Engineering (SUE). Mr. Driscoll has 29 years of experience in the engineering, survey and utility locates fields. Mr. Driscoll coordinates the utility locate crews that perform horizontal locates as well as vertical utility locating using both vacuum pothole excavation, electromagnetic induction (EM) for toned utilities, 2-D ground penetrating radar (GPR) and 3-D scanning (radar tomography). Mr. Driscoll wlll be responslble for coordinating all aspects of subsurface utlllty engineering (utlllty locates) as needed for the duration of the contract. Alan Lopez is the Utility Locates (SUE) Field Supervisor. Mr. Lopez has 19 years of experience in the survey, utility locating and utility construction fields. He has performed or overseen in excess of 5,000 vacuum soft digs and conduc ted thousands of 2-D ground penetrating radar studies and 3-D radar tomography scanning's for buried utility mapping efforts. Mr. Lopez wlll be responslble for providing fleld supervision for subsurface utlllty engineering (utlllty locates) services as needed for the duration of the contract. 0 �h .: 34 inches Depth = l4 ini:he1i *Please refer to Section E2 -Prime Consultant SF 330 Forms for further information on key staff. 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 � Craig A. Smith & Associates, Inc. Engineers • Surveyors • Subsurface Utility Engineering 3D Subsurface Imaging • Utility Coordination SECTION E1 -QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL CAS TEAM (SUBCONSULTANTI EXPERIENCE The CAS Team Is an experienced team which has worked together to successfully complete numerous munlclpal utility and Infrastructure capital Improvement pro!ects throughout South Florida. S ith E • • Smith Engineering Consultants, Inc. (SEC) is a multi-" . ffl ng1neenng disciplined consulting engineering firm specializing 1 in electrical, instrumentation and SCADA system Consultants,ln c. designs for Water/Wastewater, Stormwater and lighting projects. SEC has a niche for providing professional services on such civil engineering projects. Their experienced staff have in-depth knowledge of energy, water, telecommunications, transportation and architectural projects. Their cost­ effective and energy efficient designs provide facility owners with security in the knowledge that their operating expenses are among the lowest in the area. Whether a client's project calls for new construction or the renovation of aging facilities, their staff can provide planning and design services, cost estimates, and construction phase services. SEC has built a deserved reputation for completing assignments in a cost-effective and timely manner. You can count on SEC to provide the detailed plans and specifications necessary for smooth construction, start-up, and operation. They interface with design engineers from complimentary disciplines during the design process to review design principles and to assist in the preparation of design drawings and specifications for specific project needs. The firm will be providing all electrical engineering work related to lift and pump stations, street lighting and other facilities necessary to complete projects under this contract. SEC recently provided electrical engineering services for CAS which Included site lighting and electrical plans for 2 multi-purpose fields, an amphitheater and associated parking lot for the Acreage Community Park South Expansion project, electrical and control panel upgrades for Sun-N-Lake Improvement District's Mantanms Wastewater Lift Station and Glades County's Washington Park Wastewater Lift Station. Below is a list of municipal clients in the Tri-County area that Smith Engineering Consultants has provided electrical engineering services for utility and infrastructure projects. City of Atlantis City of Homestead City of Boca Raton City of Pompano Beach City of Delray Beach Town of Jupiter Town of Manalapan City of Lake Worth Beach Northern Palm Beach County Improvement District Palm Beach County Solid Waste Authority Indian Trail Improvement District Town of Palm Beach Palm Beach County City of West Palm Beach Village of Royal Palm Beach Village of Wellington Broward County Aviation Department City of Ft. Lauderdale City of Boynton Beach City of Hallandale Beach 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 SECTION E1 -QUALIFICATION � Craig A. Smith & Associates, Inc. Engineers • Surveyors • Subsurface Utility Engineering 3D Subsurface Imaging • Utility Coordination INFORMATION AND ASSIGNED PERSONNEL· City of Doral City of Belle Glade Beeline Community Development District Town of Lantana City of Palm Beach Gardens City of Sunrise City of Fort Lauderdale City of Miami Beach Lake Worth Drainage District Florida Department of Transportation South Florida Water Management District Below is a sample list of successfully completed water, wastewater and stormwater related projects: Palm Beach County WTP No. 8 Wellfield Cable Replacement WTP No. 8 UPS Installation CROC Generator to SCADA Connection PS 5229 Arc Flash & Condition Assessment PS's 9S, 9N, & 5 Arc Flash & Condition Assessment PS's 4i00, 5241, & Mecca Arc Flash & Condition Assessment SRWRF Biogas Generators Pahokee WWTP Arc Flash & Condition Assessment Belle Glade WWTP Arc Flash & Condition Assessment WTP No. 8 Arc Flash & Condition Assessment SRWRF PLC Programming Belle Glade WWTP PLC Programming 2016 Telemetry Information Management System (TIMS) Lift Station Upgrades, Design and Construction Phase Services 2017 Telemetry Information Management System (TIMS) Improvements, Design and Construction Phase Services WUD Electrical Safety Plan SRWRF PLC Programming SRWRF Electrical Master Plan Belle Glade and Pahokee WWTP Electrical Switchgear Assessment Morikami SCADA Tower Design and Construction Phase Services Miscellaneous Services (Morikami Park Pump Station, Other smaller projects) City of West Palm Beach Lift Station No. 5 Electrical Service Relocation Lift Station No. 75 Improvements Lift Station No. 4, 7, and 153 Improvements Lift Station No. 74 Improvements Lift Station No. 44 Improvements Renaissance Project Stormwater Treatment and Pump Station Water Treatment Plant Generator Replacement Town of Jupiter R.O Well No. i2 Acid Spill Report 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 � Craig A. Smith & Associates, Inc. Engineers • Surveyors • Subsurface Utility Engineering 3D Subsurface Imaging • Utility Coordination N.Central Pump Station VFD's WTP High Service Pumps Replacement WTP Wells Installation WTP Transfer Pump Installation Town of Palm Beach Wastewater Flow Meter Installation Stormwater Pump Stations D-6 & D-7 Stormwater Pump Station D-10 Stormwater Pump Station D-9 El Brillo and Jungle Road Lift Station Generators Village of Wellington SECTION E1 -QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL Stormwater Pump Stations 3, 6, & 7 VFD Installat ions Stormwater Pump Stations 4 & 8 VFD Installations Binks Forest Lift Station Water Level Monitoring Sites Village Utilities Standards Design Update Village Royale Lift Station Multiple Village Lift Station Evaluations City of Fort Lauderdale George T. Lohmeyer WWTP Effluent Pumps VFD Replacement Peele-Dixie WWTP Electrical Service Modifications Fiveash WTP Backwash Pump Replacement George T. Lohmeyer WWTP Arc Flash Study SEC also has in-depth knowledge of lighting design projects. Their cost-effective and energy efficient designs provide facility owners with security in the knowledge that their operating expenses are among the lowest in the area. Whether projects require new construction or the renovation of aging fa cilities, SEC staff can provide planning and design services, cost estimates, and construction phase services related to street lighting projects. They have extensive experience in the following areas of electrical engineering design applicable to lighting projects: electrical service and distribution design; conventional, decorative, and high mast lighting design (including illumination calculations (photometrics)); signalization (including signal timing, cable diagrams, system quantities and conduit sizing calculations, and programmable logic controller integration); and electrical power systems analysis (including voltage drop calculations, short-circuit coordination, and ar c-flash). SEC has established a reputation for completing assignments in a cost-effective and timely manner. They have accomplished this through innovative thinking, careful planning, and professionals who believe in quality and hard work. You can count on SEC to provide the detailed plans and specifications necessary for smooth construction, start-up, and operation. SEC has completed numerous successful lighting projects for the City of West Palm Beach. Smith Engineering Consultants, Inc. is a Certified CSE firm with Broward County and will be providing electrical engineering services for the duration of this contract. 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 � SECTION E1 -QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL Craig A. Smith & Associates, Inc. Engineers • Surveyors • Subsurface Utility Engineering 3D Subsurface Imaging • Utility Coordination Founded in 1997, RADISE International, L.C. (RADISE) specializes -: RAD IS E in providing Geotechnical Engineering, Materials Testing and Inspection Services. RADISE has a staff of 64 including local professional engineers, field and laboratory technicians, geo­ technical drillers, inspectors and support staff servicing Miami I N T E R N A T I o N A L Dade, Broward and Palm Beach Counties. Our senior staff has 250+ years of combined Geotechnical Engineering, Materials Testing and Inspection experience. RAD/SE has been serving Florida for 20 years, and has always been a financially sound firm. They have a history of no litigation, and maintain a safety first record of no OSHA lost time. Spectallzed Experience and Technical Competence are as follows but are not llmlted to: • • • • • • • • • • Geotechnical Engineering Services (subsurface studies) Geotechnical Drilling (Standard Penetration Test borings) Foundation Analysis (recommendations and design) Bridge Piling Design including WEAP Analysis Construction Materials Testing and Inspections, including soils & concrete tests Construction Monitoring and Inspections (CEI), including PDA, driven pile inspections, vibro­ compaction/replacement oversight, auger cast pile load test and production pile monitoring, post-tension inspections and vibration monitoring. Masonry Tests, Asphalt Monitoring and Tests Non-destructive tests (Impact Hammer and Windsor probe) Special and Threshold Inspection Services Geosynthetic Materials (geomembranes, geotextiles, geonets and geosynthetic clay liners) Inspections As experts in providing geotechnical engineering and materials testing and inspection services, they are skilled in conducting site investigation, evaluation, design and preparation of engineering plans; preparing specifications and contract documents; master planning, permit preparation construction inspections/oversight; as well as serving as liaison with project owners, cities, counties, consultants, agencies and stakeholders. They perform all drilling in-house with multiple truck and track mounted drill rigs. RADISE is also an FOOT CTQP Training Provider, training in-house staff, FOOT personnel and outside clients. Offices and Certified Testing Labs: RADISE has 3 offices in Palm Beach, Broward and Miami-Dade Counties; and 2 certified construction materials testing laboratories in Palm Beach (FOOT/CMEC/USACE certified) and Broward (FDOT/CMEC certified) Counties. Experience: For over 20 years, RADISE has provided geotechnical engineering, field and lab construction materials testing, inspection and quality control services for projects throughout Florida. Their significant experience and a solid background working with both the Public and Private Sectors in South Florida includes continuing service contracts with numerous Cities, Counties, and School Districts, and they work extensively with the SFWMD, FOOT and USACE, on operations that run 24/7 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 � Craig A. Smith & Associates, Inc. Engineers • Surveyors • Subsurface Utility Engineering 3D Subsurface Imaging • Utility Coordination SECTION E1 -QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL Quallty Control: RADISE developed and utilizes a Quality Control System that is a powerful, web-based application. The QC system enhances project success with features that sim plify reporting, and create instant results/reports for clients, 24/7, accessible via the internet. The QC System has proven to be a significant advantage when reporting to the level that is required by many agencies. RADISE International also offers engineering inspection and testing services to clients to confirm the quality of the work performed and construction materials used in their projects. RADISE's engineering inspectors and technicians are trained to monitor and record workmanship and to inspect and document material conformance to project specifications. Their involvement helps prevent deviations that can affect the quality or compromise the design of projects. RADISE Certified or Validated test methods (CMEC/AMRl/USACE'/FDOT) •Soil •Bituminous •Aggregate •Masonry •Concrete •Rock Mr. Andrew Nixon has coordinated closely with CAS as project manager in providing geotechnical services for numerous project for CAS throughout South Florida. Mr. Nixon was responsible for ensuring quality and timely geotechnical services for a myriad of utility projects (i.e., water main, sewer force main, drainage, roadway and pump station projects) designed and managed by CAS for the following municipal clients: Sunny Isles Beach Indian Trail Improvement District Spring Lake Improvement District City of Margate City of Moore Haven Hardee County Okeechobee County City of Belle Glade In addition, RADISE is currently part of the CAS Team and provides geotechnical engineering services for the City of Margate, Sunshine Water Control District and the City of Delray Beach NW Neighborhood Improvement Project. RADISE Is a Certified SBE-M/WBE firm with the Palm Beach County, M/WBE State certified Rorlda DOT DBE and South Rorlda Water Management District SSE and will be providing geotechnical, material testing and construction oversight/engineering and inspections (CE/) support services for the duration of this contract. 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 Craig A. Smith & Associates, Inc. SECTION E1 -QUALIFICATION INFORMATI ON AND ASSIGNED PERSONNEL. DAm,llo AJamll & """"' 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 � SECTION E1 - QUALIFICATION •. Craig A. Smith & Associates, Inc. Engineers • Surveyors • Subsurface Utility Engineering 3D Subsurface Imaging • Utility Coordination INFORMATION AND ASSIGNED PERSONNEL Bermello Ajamil & Partners, Inc. will be providing Environmental Engineering and Public Outreach services from their Miami office location for the duration of this contract. -�ineers, Inc. MUE Engineers, Inc. is a full service, dynamic structural engineering, and inspection firm. They have a sound understanding of all types of building processes and provide services for commercial, industrial, legal, and residential clients for any type and size of project. Whether they are designing a one floor, an eight floor or a thirty-floor building, it is important to select the structural system which best suits the project, while keeping in mind the project budget, constructability, and local construction techniques and methods. Founded in 2010, MUE provides a full range of structural engineering services, including: structural design, specialty engineering, structural assessments, threshold, special and 40-year inspections, restoration and peer reviews and feasibility studies. Their professional experience covers a comprehensive array of projects including: multi-family and condominium residences, custom single­ family residences, car dealerships, hotels, parking garages, road/pedestrian bridges, fire stations, public safety complexes, police stations, public parks, lifeguard towers, sea wall restoration and repair, retail structures, municipal facilities, office buidings, courthouses, etc. In addition to new construction, they have extensive experience with remodels, restorations and renovations of existing structures needing additional space, upgrades, or repairs of failing structural components. Example projects include: wood observation deck and tower repairs, hotel remodels, sea wall restorations, water proofing replacements, all types of concrete restoration and corrosion protections, streetscaping improvements, airport expansions, water park features, etc. MUE has extensive experience in the public sector and have been involved on numerous city and county continuing contracts within the state. Their involvement with these projects have ranged to structural design and engineering of new fire stations, maintenance buildings, adm inistration buildings, park observations walkways, boardwalks, gazebos and restrooms, to the remodel, conversion or restoration of existing structures, such as police stations, sea walls, jetties, piers and park structures. MUE has/is working on several successful projects, including structural modifications and inspections to the Pompano Beach Airpark Water Treatment Plant Control Room, Administration Building and Control Tower. MUE is a Broward County-Certified CBE firm and provides services to commercial, industrial, municipal, legal and residential clients for projects of all types and sizes as stated above. MUEngineers is committed to providing innovative, sustainable and high quality design solutions to meet and exceed client expectations and needs. Currently MUEngineers is part of the CAS Team to provide structural engineering services for continuing professional engineering services with the City of Lake Worth. In addition, MUEngineers recently completed for CAS a seawall design for Torry Island Camp grounds in the City of Belle Glade. MUEngineers, Inc. is a Certified CSE firm with Broward County and will be providing the structural engineering needs for the duration of this contract. 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 Craig A. Smith & Associates, Inc. Engineers • Surveyors • Subsurface Utility Engineering 30 Subsurface Imaging • Utility Coordination 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 ARCHITECT -ENGINEER QUALIFICATIONS PART 1-CONTRACT-SPECIFIC QU ALIFICATIONS 1. TITLE AND LOCATION (City and State) REQUEST FOR QUALIFICATIONS RFQ 20-07-01 CONTINUING PROFESSIONAL CONSUL TING SERVICES CITY OF SU NNY ISLES BEACH, FLO RIDA . . . 3. SOLICITATION OR PROJECT NUMBER I I • I I I I B.ARCHITECT-ENGINEER POINT OF CONTACT 4. NAME AND TITLE Stephen C. Smith, P.E., President/CEO 5. NAME OF FIRM Craig A. Smith & Associates, Inc. a: 9.FIRM NAMEw >za: ' I--, a: < 0.. Craig A. Smith & X Associates, Inc. a CHECK IF BRANCH OFFICE Smith Engineering X Consultants, Inc. b CHECK IF BRANCH OFFICE Bermello Ajamil & X C Partners HECK IF BRANCH OFFICE X RADISE International, LC HECK IF BRANCH OFFICE e MU Engineers, Inc X []CHECK IF BRANCH OFFICE ■ 8. E-MAIL ADDRESS ssmith@craigasmith.com 10.ADDRESS 11.ROLE IN THIS CONTRACT 21045 Commercial Trail PRIME Boca Raton, FL 33486 2161 Palm Beach Lakes SUBCONSULTANT Boulevard, Suite 312 West Palm Beach, FL 33409 Electrical Engineering 2601 S. Bayshore Drive, SUBCONSUL TANT Suite1000 Environmental Miami, FL 33133 Engineering & Public Outreach 10486 NW 31 st Terrace SUBCON SULTANT- Doral, FL 33172 Geotechnical I CEI Services 3440 NE 12th Ave. SUBCON SULTANT- Oakland Park, FL 33334 Structural Eng ineering D.ORGANIZATIONAL CHART OF PROPOSED TEAM X (Attached) E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) 12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE Stephen C. Smith, P.E. Project Director/Contract Manager a.TOTAL b.WITH CURRENT FIRM 34 32 15.FIRM NAME AND LOCATION (City and State) Craig A. Smith and Associates, Inc.State of Florida Boca Raton, Florida Boatd of Pr°.!!!!:!al Enaifl«,. ,-....,,C.., ..... ,P..11. /i,.•, ._....., ............. �--a..-.m.�,_ a...,_..,.,-.:, ,..a.u..""" -�-· - 16.EDUCATION (DEGREE AND SPECIALIZATION) Bachelor of Science, Civil Engineering, 1988 17.CURRENTLY PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)Auburn University, Auburn, Alabama Bachelor of Science, Building Construction, 1986 Auburn University, Auburn Alabama Professional Engineering State of Florida License No. 48914 18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organization, Training, Awards, etc.) a. 19.RELEVANT PROJECTS (1)TITLE AND LOCATION (City and State) Consulting Engineer, Town of Pembroke Park Pembroke Park, Florida 2 YEAR COMPLETED PROFESSIONAL CONSTRUCTION (if SERVICES a licable On oin 3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE x Check if pro·ect performed with current firm Consulting Engineer as it relates to all water, wastewater, road and bridge issues, NPDES projects, site plan review and agency coordination (FOOT, SFWMD, FDEP, etc.). b.(1) TITLE AND LOCATION (City and State) Consulting Engineer, City of Pompano Beach Pompano Beach, Florida 2 YEAR COMPLETED PROFESSIONAL CONSTRUCTION (if SERVICES a licable On oin 3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE x Check if project performed with current firm Consulting Engineer as it relates to all water distribution, wastewater collection and conveyance, drainage and roadway improvements, site plan review and agency coordination (FOOT, SFWMD, FDEP, etc.). c.(1) TITLE AND LOCATION (City and State)2 YEAR COMPLETED Palm Island and Hibiscus Island Stormwater and Roadway PROFESSIONAL CONSTRUCTION (if Improvements SERVICES a licable City of Miami Beach, Florida 2014 2019 3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE x Check if pro·ect performed with current firm Capital Improvement Project where CAS was responsible for the drainage system, roadway design and harmonization components of the CIP. Design incorporated engineering techniques to reduce future sea level rises such as elevating the existing roadways, increasing the size of the drainage system, providing water quality, installing three pump stations and backflow prevention devices to avoid extreme high tides for re-entering the systems. Design cost were $404,154 and total project cost was $8,000,000. d. e. f. g. h. i. (1)TITLE AND LOCATION (City and State)(2) YEAR COMPLETED City of Pompano Beach Non-Sewer Area C: Sanitary Sewer PROFESSIONAL CONSTRUCTION (if Improvement SERVICES aoolicable) Pompano Beach, Florida Ongoing Pending (3)BRIEF DESCRIPTION (scooe, size, cost, etc.} and SPECIFIC ROLE X Check if project performed with current firm The project consisted of the installation of a new wastewater collection system for 38 commercial/light industrial properties which are currently on septic tanks. CAS conducted a Sanitary Sewer Service Study for the city to identify design solutions. The recommendations from the study determined that the new system shall consist of one wastewater lift station along with associated gravity sewer and force main lines and include connections to two (2) existing city wastewater lift stations. Design fees for this project are $198,803. The construction cost estimate: $1,800,000. (1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED City of Sunny Isles Beach NE 174th Street Stormwater and PROFESSIONAL CONSTRUCTION (if Pavement Improvements SERVICES aoolicable) Sunny Isles, Florida 2014 2017 (3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm The project consists of reconstruction of both drainage and roadway along NE 174th Street for approximately 0.2 miles from Collins Avenue to North Bay Road. The design also includes a new drainage system that meets water quality requirements, site demolition, road regrading, utility relocations, sidewalks, paver walkways, landscaping, curbing, bike paths and parallel parking. Construction cost: $2,147,800 (Phase I). (1} TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Stormwater and Pump Station Improvements Phase IV PROFESSIONAL CO NSTRUCTION (if Sweetwater, Florida SERVICES applicable) 2011 2013 (3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm Due to repetitive, historical flooding within the 138 acre residential area, Phase IV Stormwater Improvements for the City of Sweetwater received substantial HMGP funding from FEMA. The projects consisted of 130 structures, 10,795 linear feet of drainage pipe ranging in size from 15-inch to 72-inch, 1,506 linear feet of 30-inch force main and 2-triplex pumping stations (28 HP). Construction cost: $4,090,000. (1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED Town of Golden Beach, Consulting Engineer PROFESSIONAL CONSTRUCTION (if Golden Beach, Florida SERVICES aoolicable) Ongoing N/A (3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm Consulting Engineer as it relates to all water, stormwater, roadway engineering including beautification. (1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED Town of Golden Beach CIP Phase II and Iv Stormwater PROFESSIONAL CONSTRUCTION (if Collection System with Master Pump Stations SERVICES applicable) Golden Beach, Florida 2008 2011 (3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm The project consisted of a stormwater master pump station, 14,500 linear feet of DIP drainage pipe and stormwater force main ranging in size from 16-inch to 72-inch. Construction cost: $7,667,276. (1)TITLE AND LOCATION (City and State)(2} YEAR COMPLETED Town of Golden Beach Phase IV Stormwater Improvements PROFESSIONAL CONSTRUCTION (if Golden Beach, Florida SERVICES aoolicable) 2004 2006 (3} BRIEF DESCRIPTION (scooe, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm The project consisted of the installation of 1 ,775 linear feet of drainage pipe ranging in size from 15-inch to 72- inch, 600 linear feet of force main, 32 drainage structures, a stormwater pump station, a bypass weir structure and a water quality structure. Construction cost: $2,031,740. j.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED City of Sweetwater Stormwater Pump Station Improvements PROFESSIONAL CONSTRUCTION (if Phase 2B North and South SERVICES applicable) Sweetwater, Florida 2006 2006 (3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm A 65-acre basin area located in the southern part of City know for historical repetitive flooding. Both projects consisted of a stormwater collection system that converges into a duplex pumping station. Collectively, the projects include 100 drainage structures 9,760 LF of drainage pipe ranging in size from 15 inch to 72 inch, 1,050 LF of 30 inch and 36 inch DIP FM and road and landscape restoration. Design and permitting fees cost was $332,150. Construction cost for both portions of Phase 2: $4,043,110. k.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED City of Sweetwater Stormwater and Pump Station PROFESSIONAL CONSTRUCTION (if Improvement Phase I and Ill)SERVICES applicable) Sweetwater, Florida 2000 2004 (3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm The project consisted of 115 structures, 7,400 linear feet of drainage pipe ranging in size from 15-inch to 72-inch, 7,325 linear feet of stormwater force main ranging in size from 24-inch to 48-inch, four duplex pump stations, roadway restoration and complete reconstruction of 2,500 linear feet of NW 112th Avenue. Construction cost: $7,058,530. ' E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME 13.ROLE IN THIS CONTRACT Project Engineer -Stormwater 14. YEARS EXPERIENCE Orlando A. Rubio, P.E. 15.FIRM NAME AND LOCATION (City and State) Craig A. Smith & Associates, Inc. Boca Raton, Florida 16.EDUCATION (DEGREE AND SPECIALIZATION) S.S. Civil Engineering, 198 8 University of Florida, Gainesville, FL A.A., 1985 Miami Dade Community College, South Campus, Miami, FL a.TOTAL 32 b.WITH CURRENT FIRM 20 17.CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Engineer State of Florida License No. 48265 18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Hydraulic Hydrologic Modeling -Streamline Technologies -ICPR University of Florida -TREOO -HEC -RAS Modeling 19 RELEVANT PROJECTS (1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED Village of El Portal PROFESSIONAL CONSTRUCTION (If El Jardin Stormwater Improvements SERVICES ADDlicable) El Portal, Florida 2017 Pending a (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Project Manager & Design Engineer: Design, permitting, modeling, bidding, and construction management of a $2.4 million stormwater retrofit project. (1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED Sunshine Water Control District (SWCD)PROFESSIONAL CONSTRUCTION (If West Outfall Canal Improvements SERVICES ADDlicable) Coral Springs, Florida 2014 2019 b (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Project Manager & Design Engineer: Conceptual hydraulic modeling of a 2-mile primary canal of the SWCD. Phase 1 design, permitting, modeling, bidding, community outreach, and construction management of the $3,000,000 oroiect. (1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED Spring Lake Improvement District (SLID)PROFESSIONAL CONSTRUCTION (If Stormwater Treatment Area SERVICES Aoo/icable) Sebring, Florida 2014 2017 C (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Project Manager & Design Engineer: Obtained initial project funding from FDEP. Design, permitting, modeling, bidding, and construction management of a $3,300,000 project. Report for FDEP. ( 1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED Phase IV Stormwater Improvements PROFESSIONAL CONSTRUCTION (If City of Sweetwater, Florida SERVICES ADDlicableJ 2010 2017 d (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Project Manager & Design Engineer: Design and permitting of stormwater retrofit project ($3.8M). Preparation of construction plans, bid schedule, cost estimate, bidding assistance and engineering services for the ongoing construction. (1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED Golden Beach Stormwater Improvements PROFESSIONAL CONSTRUCTION (If Golden Beach, Florida SERVICES Aon/icableJ 2008 2012 e (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Project Manager & Design Engineer: Design and permitting of a stormwater retrofit ($6.0 million). Prepared cost estimated, bid schedule, provided bidding assistance and FEMA orant aoolication documentation. (1)TITLE AND LOCATION (City and State)PROFESSIONAL CONSTRUCTION (If East-West Conveyance Drainage Project SERVICES AoolicableJ Okeechobee, Florida 2015-2017 NIA f (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Project Manager & Design Engineer: As a prime component of the East-West Conveyance Drainage Project, CAS was tasked with improving the hydraulic efficiency of the Whidden Ditch through canal improvements at strategic locations in order to provide food protection for the area and reduce canal maintenance. The scope of work included surveying of the project area including preparation of conveyance/maintenance easements for all identified conveyances, a detailed stormwater modeling analysis, preparation of a conceptual plan with phasing and a final engineering report. Total cost for survey, hydraulic analysis, conceptual design, and final engineering report was $138,360. The project began in July 2015 and was completed on time in April 2017. (1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED Oak Park Subdivision Stormwater Improvements PROFESSIONAL CONSTRUCTION (If Okeechobee County, Florida SERVICES Aoolica ble J 2015 2016 g 3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Project Manager & Design Engineer: CAS was tasked to design and construct stormwater improvements for the Oak Park Residential Subdivision entailing approximately 90 homes in order to improve local drainage. Total design costs for the project improvements including construction manageme nt was $166,938. The initial construction cost was $914,589 with County requested change orders totaling $1,353,913 for additional stormwater improvements for a total construction cost of $2,268,502. The project began in April 9, 2015 and was completed in March 17, 2016 without liquidated damages. (1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED Airport Ditch Improvements PROFESSIONAL CONSTRUCTION (If Okeechobee County, Florida SERVICES Aon/icable) 2014 2014 h 3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Project Manager & Design Engineer: The Airport Ditch Improvements Project for Okeechobee County consists of bank stabilization, re-shaping, sodding of canal washouts, easement and right-of-way issues. This NRCS project was a 75/25 match that involved debris removal from rip-rap rock bank stabilization to prevent erosion due to Tropical Storm Isaac. Total design costs for the project was $25,000. Total construction cost was $500,000. The project began in January 2014 and was completed in March 2014 on time and without liquidated damages. (1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED Southwest Drainage Improvements PROFESSIONAL CONSTR UCTION (If Okeechobee County, Florida SERVICES Aoolicable) 2010 2013 i (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Project Manager & Design Engineer: The Southwest Drainage Project for Okeechobee County is a HMGP/FEMA project that includes stormwater improvements within three (3) rights-of-way in Okeechobee County and benefited a 170-acre urbanized area of the County including improved access to a hurricane shelter. The stormwater improvements included the installation of stormwater gravity collection systems with water quality treatment components incorporated into the project design. This project supported and augmented the protection of the Northern Everglades Ecosystem, the Lake Okeechobee Protection Act, and accomplished objectives of the South Florida Water Management District. This project was 100% grant funded. Total design costs including construction management for the project were $348,870. Total construction cost was $1,392,670. The project beoan in June 2010 and was completed in Januarv 2013 without liquidated damaoes. (1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED Palm Island & Hibiscus Stormwater and Roadway PROFESSIONAL CONSTRUCTION (If Improvements SERVICES Aoolicable) j City of Miami Beach, Florida 2014 2019 3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE current firm X Check if project performed with Project Manager & Design Engineer: Capital Improvement Project where CAS was responsible for the drainage system, roadway design and harmonization components of the CIP. Design incorporated engineering techniques to reduce future sea level rises such as elevating the existing roadways, increasing the size of the drainage system, providing water quality, installing three pump stations and backflow prevention devices to avoid extreme high tides for re-entering the systems. Design cost were $404,154 and total project cost was $8,000,000. Title and location (City and State) I (2)YEAR COMPLETED Ranch Lake Estates Southwest Improvements City of Moore Haven, Florida PROFESSIONAL CONSTRUCTION (If SERVICES Aoolicable) 2010 2015 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND X Check if project performed with current SPECIFIC ROLE firm k Project Manager & design Engineer: The Ranch Lakes Estates Improvements Project for the City of Moore Haven consisted of the construction of a gravity stormwater drainage system along with two major stormwater pump stations including force mains and canal dredging. Construction included the installation of 7,103 linear feet of HOPE drainage pipe ranging in diameter from 15-inch to 48-inch, 1,044 linear feet of force main, 76 drainage structures, and two stormwater pump station with two pumps. Total construction cost was $2,031 ,000. The project began in January 2010 and was completed in July 2015 without liquidated damages. At the owner's request, pumps were redesigned to operate under tractor power during emergency conditions in lieu of traditional standby generator. E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) 12.NAME 13.ROLE IN THIS CONTRACT Project Engineer -Water & Sewer 14.YEARS EXPERIENCE Greg Giarratana a.TOTAL b.WITH CURRENT FIRM 43 22 15.FIRM NAME AND LOCATION (City and State) Craig A Smith and Associates, Inc. Boca Raton, Florida 16.EDUCATION (DEGREE AND SPECIALIZATION)17.CURRENTLY PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)B.S. Civil/Environmental Engineering, 1977, Rogers Williams University, Bristol, Rhode Island 18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organization, Training, Awards, etc.) ASCE, WPCF and AWWA a. b. 19.RELEVANT PROJECTS (1)TITLE AND LOCATION (City and State)2 YEAR COMPLETED Wauchula Hills Water and Sanitary Sewer Improvement PROFESSIONAL CONSTRUCTION (if Project -Phase VI SERVICES a licable Wauchula, Florida 2017 3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE x Check if pro·ect erformed with current firm Project manager: Professional engineering services for the installation of approximately 1,325 linear feet of 6" water main, 6,460 linear feet of 8" water main, and 4,862 linear feet of 1 O" water main including roadway/driveway restoration including fire hydrants and valves, and connections to existing 4" and 12" water mains. This project is funded through a multi-year special legislative appropriation. The project design cost, including construction management is $100,426. The project construction cost is $1,826,130. (1)TITLE AND LOCATION (City and State) Spring Lake Improvement District US Highway 98 / Country Road 700 Wastewater Force Main System Expansion Sebrin , Florida 2 YEAR COMPLETED PROFESSIONAL CONSTRUCTION (if SERVICES a licable 2019 Pending 3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE X Check if pro·ect performed with current firm Project Manager: Design, survey, utility locates, geotechnical investigation, grant funding, permitting and construction for the installation of approximately 12,400 linear feet of wastewater forcemain along US Highway 98/County Road 700 to expand the district's new wastewater treatment plant service area for commercial development along the corridor. This project is 100% grant funded (legislative appropriation). Design cost including construction management is $184,777. Estimated construction cost is $9 12,000. C.(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED City-County Public Works Authority PROFESSIONAL CONSTRUCTION (if Gr avity Sewer Expansion N, 0, S Avenue and 4th Street SERVICES aoolicable) Moore Haven, Florida 2018 2020 (3)BRIEF DESCRIPTION (scooe, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm Project Manager: Design, permitting, surveying and construction for the expansion of a gravity sewer system along Avenue N, 0, S and 4th street from the 8 th street canal to Riverside Drive consisting of approximately 4,428 linear feet of 8" sanitary sewer collection mains including manholes, service laterals and connection to the existing sanitary sewer gravity and wastewater lift station system. The total design costs for the project are $142,093 with construction costs totaling $749,755. d.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED Spring Lake Improvement District PROFESSIONAL CONSTRUC TION (if Water Main Extension -Madrid Drive & US98 SERVICES aoolicable) Sebring, Florida 2017 2018 (3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm Project manager: Planning design, computer modeling, permitting and construction management for the installation of approximately 500 linear feet of a 1 O" water main and 50 linear feet of 8" water main with all appurtenances along Madrid Drive. The project included a connection to an existing 6" water main at the intersection of Madrid Drive and Holly Lane and approximately 200 linear feet of 1 O" HOPE horizontal directional drill under the south right-of-way line of US 98 at the intersection of Revson Avenue. Total design cost was $12,450 and total construction cost was $76,238. e. {1) TITLE AND LOCATION (City and State) (2)YEAR COMPLETED Moore Haven Water System Improvements Phase 1 PROFESSIONAL CONSTRUCTION (if Moore Haven, Florida SERVICES applicable) 2008 2012 (3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm Project Manager: Planning, design, computer modeling, permitting and construction management of this project. The City of Moore Haven Phase I Water Treatment Plant Expansion was designed to allow an increase in plant productivity of an additional 0.50 MGD and to provide service to the proposed industrial park at US 27 and SR 78. Scope of work included a 500,000 GPO water treatment ultra filtration (Zenon) plant, a 300,000 gallon ground storage tank with booster pump station and re-chlorination facility, approximately 3.5 miles of 12-inch distri bution main, and two high service pumps connecting the existing downtown storage tank to the water tank site. The project was fully funded by the US Department of Agriculture (USDA). The design costs for the project were $325,000 with a total construction cost of $3,543,031. f. (1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED Miccosukee Water Distribution System Improvements PROFESSIONAL CONSTRUCTION (if Miami, Florida SERVICES applicable) 2011 2015 (3)BRIEF DESCRIPTION (scooe, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm The water system improvements for the Miccosukee Tribe of Indians of Florida included expansion of the tribe's water distribution system including 15,000 feet of 12-inch water mains and rehabilitation of existing elevated storage tank piping. Total design costs for the project were $516,000. Total construction costs were $2,580,000. g.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED Palm Beach County Lake Region Pipeline PROFESSIONAL CONSTRUCTION (if Palm Beach, Florida SERVICES applicable) 2005 2006 (3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm Project Manager: Design plans and contract documents, hydraulic modeling and permitting for a 20 mile lake regional potable water pipeline. Project consisted of designing approximately 91,200 feet of water distribution main to serve the cities of Pahokee, Belle Glade and South Bay from the central lake region water treatment plant located on Hooker Highway in Belle Glade. Design included raw water piping from 7 potable water wells to the county reverse osmosis water treatment plant. Raw water mains ranged from 12" diameter at each well to 30" diameter entering the water treatment plant. The water treatment plant discharge pipe line consisted of 30" diameter down to 1" diameter mains when tied into the cities of Pahokee and South Bay. The total pipeline construction cost was approximately $10,000,000. h.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED Hardee County Bowling Green Water Line Replacement PROFESSIONAL CONSTRUCTION (if Moore Haven, Florida SERVICES aoolicable) 2004 2005 (3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm Project Manager: Design, hydraulic modeling, surveying, bidding, construction management of this $500,000 pipeline project consisting of 4,000 feet of 8" diameter water mains. i.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED ITID Water Main Extension PROFESSIONAL CONSTRUCTION (if West Palm Beach, Florida SERVICES aoolicable) 2003 2004 (3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm Project Manager: Design, hydraulic modeling, permitting, and construction management of a $1.5M nine mile long, 12" diameter water main to extend West Palm Beach utilities water service to western Indian Trial Improvement District. j.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED Avenue R Stormwater Improvements PROFESSIONAL CONSTRUCTION (if Moore Haven, Florida SERVICES aoolicable) 2016 2018 (3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm Project Manager: The City of Moore Haven continues to address flooding and water quality issues by improving its existing conveyance systems with upgrades to existing swales, box culverts, flow efficiency devices, drainage apparatuses and pump stations. This phase of stormwater improvements involved the relocation of existing utilities and the installation of 1,200-LF of plastic swale liner (1/4 section of 12-inch ID smooth inner wall perforated black P.E. pipe), 350-LF of PVC culverts, ten (10) concrete headwalls, one (1) drainage structure, 4,000-SY of SOD and the regarding of 4,000-SY of swale. This project was funded using State grants secured with the help of CAS and CAS Governmental Services. The total design and construction management costs were $94,290 with the construction costs totaling to $393,304; completed within budget and on time in May of 2018. k.(1) TIT LE AND LOCATION (City and State)(2)YEAR COMPLETED Wauchula Hills Water and Sanitary Sewer Improvements -PROFESSIONAL CONSTRUCTION (if Phase IV SERVICES aoolicable) Wauchula Florida 2016 2017 (3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm Project Manager: CAS provided professional engineering services for the installation of the water and sanitary sewer improvements included approximately 6, 125 linear feet of 8" water main and 5,277 linear feet of 8" gravity sanitary sewer including connection to 51 private residences and the decommissioning of septic tanks and potable water wells. This project was funded through a multi-year special legislative appropriation. The project design costs, including construction management, were $189,628 and project construction costs totaled $1,249,013. Project construction began in March 2017 and was completed in October 2017 on schedule and under budget by $417,948. I. (1)TITLE AND LOCATION (City and State)(2} YEAR COMPLETED Wauchula Hills Water and Sanitary Sewer Improvements -PROFESSIONAL CONSTRUCTION (if Phase V SERVICES aoolicable) Wauchula, Florida 2017 Onaoing (3)BRIEF DESCRIPTION (scooe, size, cost, etc.} and SPECIFIC ROLE X Check if project performed with current firm Project Manager: CAS is providing professional engineering services for the installation of approximately 6,885 linear feet of 8" water main including fire hydrants, one duplex submersible wastewater lift station, approximately 1,500 linear feet of 4" force main and approximately 6,750 linear feet of 8" gravity sanitary sewer. This project is funded through a multi-year special legislative appropriation. The project design is currently 95% complete. The project design costs, including construction management, are $121,453. Construction began on October 15, 2019 and is on-going (currently approximately 40% complete). The project construction cost is $2,068,956. E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) 12.NAME Keith Schriner 13.ROLE IN THIS CONTRACT Project/Field Engineer 14.YEARS EXPERIENCE a.TOT AL b.WITH CURRENT FIRM 4 4 15.FIRM NAME AND LOCATION (City and State) Craig A. Smith and Associates, Inc. Boca Raton, Florida 16.EDUCATION (DEGREE AND SPECIALIZATION) Bachelor of Science, Civil Engineering, 2013 University of Central Florida, Orlando, Florida 17.CURRENTLY PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) 18.OTHER PROFESSIONAL QUALIFICATIONS Publications, Or anization, Trainin , Awards, etc. a. 19.RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) 2018 Watermain Improvements -Phase II Margate, Florida 2 YEAR COMPLETED PROFESSIONAL CONSTRUCTION (if SERVICES a licable 2019 3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE x Check if pro·ect performed with current firm Project Engineer: Responsible for the design, preparation of construction plans and contract documents, permitting, bidding, construction management and limited construction observation through project close out/start up services for the replacement of 2" galvanized steel water mains with 6" DIP water mains at fifteen (15) different locations throughout the city's service area (approximately 12,000 LF) including GPR utility locates, test hole investigations, water service line placements, ACP removal, fire hydrant replacement, fire hydrant spacing analysis and valve shutdown plan. Design cost $212,280. Construction cost $1,497.921. b.(1) TITLE AND LOCATION (City and State)2 YEAR COMPLETED Spring Lake Improvement District -WWTP and wastewater PROFESSIONAL CONSTRUCTION (if System Improvements SERVICES a licable Sebring, Florida 2017 2019 3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE X Check if pro·ect performed with current firm Project Engineer: Responsible for the design for the construction of an 80,000 GPO extended aeration activated sludge wastewater treatment plan with absorption bed effluent disposal system including a sanitary sewer lift station and an 8" / 1 O" forcemain to the new WWTP site. Project includes survey, utility locates, geotechnical investigation, environmental assessment permitting, contract document development, bidding assistance, construction management and inspection through project closeout (project is 100% SRF funded). Design and construction management cost $450,510. Construction cost is $2,8000,000. c.(1) TITLE AND LOCATION (City and State) SW 28th Street and 3 rd Terrace Roadway Okeechobee County, Florida 2 YEAR COMPLETED PROFESSIONAL CONS TRUCTION (if SERVICES a licable 2016 2018 3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE x Check if pro·ect performed with current firm Project Engineer: This particular area of Okeechobee experienced noticeable roadway settlement at fourteen locations along an existing gravity storm system. Custom construction details were produced to clearly define the scope for each trench restoration area. A valley gutter was also installed in swales to allow runoff to flow into existing inlets and keep water from ponding on driveways. Construction cost $400,000. d.(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED Wauchula Hills Phase 4.0 Water and Sewer Improvements PROFESSIONAL CONSTRUCTION (if Hardee County, Florida SERVICES aoolicable) 2016 2017 (3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm Project Engineer: Wauchula Hills is a very old neighborhood with residences on both well and septic tanks, eventually resulting in high levels of groundwater contamination. The scope of this project includes designing a gravity sewer collection system to tie into an exiting system and expanding on an existing water main system to service the rest of the neighborhood. Construction cost is $1,249,012. e. (1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED Avenue L, M, Mand 4th Street Gravity Sanitary Sewer,PROFESSIONAL CONSTRUCTION (if Forcemain and Lift Station Improvements SERVICES applicable) 2015 2016 (3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm Project Engineer: Construction of duplex submersible lift station with an 8 foot diameter wet well and approx .. 350 LF of 6" forcemain along with 6,344 LF of associated 8" and 1 O" gravity sewer line. Services included survey, design, permitting, preparation of construction plans and contract documents, bidding and construction management. Construction cost is $1,286,627. • E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key pe, son.) 12.NAME 13.ROLE IN THIS CONTRACT Engi neering -Project Engineer 14.YEARS EXP ERIENCE Al Caruso, E.I.a.TOTAL 28 b.WITH CURRENT FIRM 21 15.FIRM NAME AND LOCATION (City and State) Craig A. Smith & Associates, Inc. Boca Raton, Florida 16.EDUCATION (DEGREE AND SPECIALIZATION) Associates Degree in Engineering, 1978 17.CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Technology Middlesex County College, New Jersey 18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 19.RELEVANT PROJECTS 1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED Wastewater Pump Station No. 3 & Gravity Sewer PROFESSIONAL CONSTRUCTION (If Bal Harbour, Florida SERVICES Applicable) 2017 2018 a 3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE k:urrent firm X Check if project performed with Project Designer: Construction of new triplex submersible pump station with 12-foot diameter wet well, control panel, automatic transfer switch receptacle, on-site emergency generator, electrical upgrades and all associated appurtenances and approximately 1,350 linear feet of 18-inch gravity sewer lines to pump station. Services include survey, utility locates, design, permitting, preparation of construction plans and contract documents, bidding, and construction management. (Responsible for the desian of the aravitv sewer lines.} Construction cost $2,968,730 1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED Sewer Force Main Replacement PROFESSIONAL CONSTRUCTION (If Margate, Florida SERVICES Aoolicab/el 2013 2014 3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current Irm Project Designer: Replacement of an existing 12-inch ACP force main with a new, upsized sewer force main. The work included the installation of approximately 5,060 LF of DIP force main ranging in size from 6-inch to 20-inch, 140 LF of encased jack and bored pipe under State Road 7, 950 LF of directional drilled HOPE pipe under an existing canal, connection to an existing lift station, abandonment of the existing force main, and road and swale restoration. The project was installed from the City's wastewater treatment plant to an existina force main tie-in on State Road 7. Project cost $1,449,900 1)TITLE AND LOCATION (City and State)(2} YEAR COMPLETED Collins Avenue 12" Water Main Replacement PROFESSIONAL CONSTRUCTION (If Bal Harbour, Florida SERVICES Aoolicable) 2011 2013 C 3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm Project Designer: Responsible for design, permitting, contract document development, bidding services, construction management/inspection and certification through project close-out for installation of 1 ,800 linear feet of horizontal directionally drilled 12" HOPE water main and 680 linear feet of 12" DIP water main including five (5) fire hydrants and nine (9) tie-in connections to existinQ water mains. Construction cost $558,590 I i ' 1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED I Bal Harbour Force Main Replacement PROFESSIONAL CONSTRUCTION (If Bal Harbour, Florida SERVICES Applicable) : 2010 2011 d 3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE urrent firm X Check if project performed with Project Designer: Planning, design, permitting, preparation of construction plans, bidding and construction management of 12,000 linear feet of 16" force main trunk line to service the entire Village to pump all raw sewage to Miami Beach. Services included survey, utility locates, design, permitting, cost estimates, bidding, construction management, community outreach and survev as-builts. Proiect cost $842,570 1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED [ Capital Improvements Project-Phase Il l-IV PROFESSIONAL CONSTRUCTION (If I Golden Beach, Florida SERVICES ADDlicable) 2010 2011 e 3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with 1,,urrent firm Project Designer: Construction of submersible stormwater master pump station and approximately 14 ,500 linear feet of I drainage pipe and force main. Project cost $7,667,276 1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED Palm & Hibiscus Islands Stormwater & Roadway Improvements PROFESSIONAL CONSTRUCTION (If Miami Beach, Florida SERVICES Aoolicablel 2014 2018 3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current �rm Design engineering for a capital improvement project on Hibiscus Island including drainage system, buried utilities, roadway design and harmonization to existing residences. Construction costs total $3.7 million. E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) 12.NAME Frank Vilar, P.E. 13.ROLE IN THIS CONTRACT Project Engineer -Stormwater 14.YEARS EXPERIENCE a.TOTAL b.WITH CURRENT FIRM 25 5 15.FIRM NAME AND LOCATION (City and State) Craig A. Smith and Associates, Inc. Boca Raton, Florida 16.EDUCATION (DEGREE AND SPECIALIZATION)17.CURRENTLY PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Engineer M.S. Environmental Engin eering, Florida International University B.S. Civil Engineering, Florida International UniversityA.A., Miami-Dade College State of FloridaLicense No. 55459 18.OTHER PROFESSIONAL QUALIFICATIONS Publications, Or anization, Trainin , Awards, etc. 19.RELEVANT PROJECTS a.(1) TITLE AND LOCATION (City and State)2 YEAR COMPLETED Lake Osborne Estates Water Main Improvements Lake Worth, Florida PROFESSIONAL CONSTRUCTION (if SERVICES a licable On oin (3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm Engineering design for proposed Phase I of Lake Osborne Estates serving 228 residences. Appr oximately 16,400 LF of water main installation ranging in size from 4" to 8" is proposed, including relocation of backyard water services to the front of properties. Design costs total $183,747 and construction costs total $2,618,649. b.(1) TITLE AND LOCATION (City and State)2 YEAR COMPLETED C. Non Sewer Area C: Sanitary Sewer Improvements Pompano Beach, Florida PROFESSIONAL CONSTRUCTION (if SERVICES a licable On oin (3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm CAS is providing engineering design services for the installation of a new wastewater collection system to provide sanitary sewer service to the city's Non-Sewer Area C service area. The project area consists of 38 commercial/light industrial properties which are currently on septic tanks. CAS conducted a Sanitary Sewer Service Study for the city to identify design solutions. The recommendations from the study deter mined that the new system shall consist of one wastewater lift station along with associated gravity sewer and force main lines and include connections to two (2) existing city wastewater lift stations. Design fees for this project are $198,803. The construction cost estimate is $1,800,000. 2 YEAR COMPLETED (1)TITLE AND LOCATION (City and State) SW 2 nd Stre et Drainage Improvements Pompano Beach, Florida PROFESSIONAL CONSTRUCTION (if (3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE current firm SERVICES a licable X Check if project perf ormed with Engineering design for proposed drainage improvements of SW 2 nd Street, SW 1st Avenue and SW 1st Terrace. Design costs total $143,833 and estimated construction costs total $750,000. d.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED NW 16th Lane Drainage Improvements PROFESSIONAL CONSTRUCTION (if Pompano Beach, Florida SERVICES aoolicable) Ongoing Onqoina (3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm providing engineering design services including route survey and utility locates for the drainage improvements along the NW 16th Lane area which includes the road right-of-way and 16 property lots encompassing approximately a total of 10 acres. The project area is composed of primarily light industrial and warehouse properties. CAS will perform a drainage analysis to determine the feasibility of proposed site improvements for conf ormance with established drainage criteria. The drainage analysis will include pipe sizing analysis, flood routing design and will incorporate water quality treatment measures in the design in accordance with the City's Stormwater Master Plan. Design elements include drainage pipes, includes paving, grading, drainage and stormwater pump station improvements. Design fees for this project are $161,136. The construction cost estimate is $900,000. e.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED US 1 and NE 14th Street Drainage Improvements PROFESSIONAL CONSTRUCTION (if Pompano Beach, Florida SERVICES aoolicable) Onqoina Onaoina (3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm CAS is providing engineering design services for the drainage improvements for the US-1 and NE 14th Street Causeway area encompassing a neighborhood area of approximately 60 acres. The project area is composed of primarily residential homes with some commerci al develo pment within the project limits. CAS was directed to evaluate options available for providing drainage improvements for the area with the goal of addressing flooding and water quality treatment to the greatest extent practical. The proposed alternatives will examine the feasibility of exfiltration trench, improved pipe conveyance and swale improvements where feasible. Proposed improvements will use existing city-owned outfall systems within the project area where feasible and evaluate upsizing these systems. Design fees for this project are $196,069. The construction cost estimate is $1,626,000 f.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED Glades Roadway and Drainage Improvements, Bank of PROFESSIONAL CONSTRUCTION (if America SERVICES applicable) Boca Raton, Florida 2016 2019 (3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm Redevelopment of a 4.7 acre existing bank site. Services provided included engineering design of a 200 linear foot water main relocation, paving, grading and drainage improvements. Permitting, construction management and inspection services were also provided. Construction costs for the civil related improvements were $575,000. E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) 12.NAME 13.ROLE IN THIS CONTRACT Vice President -Surveying 14.YEARS EXPERIENCE Robert D. Keener, PSM a.TOT AL b.WITH CURRENT FIRM 42 25 15.FIRM NAME AND LOCATION (City and State) Craig A. Smith and Associates, Inc. -_,___.._ ,_ .. ·--------.--... t--.. - . , . _ . . . . . . . . Boca Raton, Florida � .............. 16.EDUCATION (DEGREE AND SPECIALIZATION) Associate of Arts Degree 17.CURRENTLY PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Florida Land SurveyorContinuing Education in Land Surveying Re istration No, 4846 19.RELEVANT PROJECTS a.(1) TITLE AND LOCATION (City and State)2 YEAR COMPLETED b. C. East-West Conveyance Drainage Project (Whidden Ditch) Okeechobee County, Florida PROFESSIONAL CONSTRUCTION (if SERVICES a licable 2015-2017 N/A 3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE x Check if pro·ect performed with current firm As a prime component of the east-west conveyance drainage project, CAS was tasked with improving the hydraulic efficiency of the Whidden Ditch through canal improvements at strategic locations in order to provide food protection for the area and reduce canal maintenance. The scope of work included surveying of the project area including preparation of conveyance/maintenance easements for all identified conveyances, a detailed stormwater modeling analysis, preparation of a conceptual plan with phasing and a final engineering report. Total cost for survey, h draulic anal sis, conce tual desi n and final en ineerin re ort was $138,360. (1) TITLE AND LOCATION (City and State) 2 YEAR COMPLETED City of Pompano Beach PROFESSIONAL CONSTRUCTION (if SW 2nd Street Drainage Improvements SERVICES a licable Pompano Beach, Florida 2018 3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE x Check if pro·ect performed with current firm Route survey including all above ground features within existing right-of-way and off-site surveying of critical drainage structures. Scope of work includes 2D GPR utility locates within the project corridor (SW 2nd street between dixie highway and cypress road, SW 1st Avenue between SW 2nd street and Atlantic Boulevard, and SW 1st terrace & court between SW 2nd street and south cypress road ). COST: $22,300 (1)TITLE AND LOCATION (City and State) City of Lake Worth Beach Lake Osborne Estates Water Main Replacement and Expansion Phase 1 Lake Worth, Florida 2 YEAR COMPLETED PROFESSIONAL CONSTRUCTION (if SERVICES a licable 2018 & 2020 Ongoing 3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE X Check if ro·ect performed with current firm Route survey along residential streets throughout community for 228 properties, including all visible improvements, above and below ground utilities, drainage structures as well as trees and landscaped areas 1 O feet outside right of way, property lines, utility easements and subsurface utility engineering (utility locates). Owner initiated change order in the amount of $17,990 for additional scope of work to include surveying and utility locates for approximately 40 additional properties as part of the Phase 1 expansion. COST: $127.153 d.(1) TITLE AND LOCATION (City and State)(2} YEAR COMPLETED City of Delray Beach PROFESS IONAL CONSTRUCTION (if Lowson Boulevard Improvements SERVICES applicable) Delray Beach, Florida 2019 N/A (3)BRIEF DESCRIPTION (scope, size, cost, etc.} and SPECIFIC ROLE X Check if project performed with current firm CAS performed survey and subsurface utility engineering as a subconsultant to Kimley-Horn & Associates, Inc. for the City of Delray Beach. The scope of work included a survey of all above ground visible improvements and utilities within the right-of-way of Lowson Boulevard (SW 10th Street) and 10 feet beyond the right-of-way line from the east right-of-way of Congress Avenue to the intersection of SE 6th Avenue. In addition, rims, pipe invert elevations, sizes and pipe materials were acquired for all existing drainage structures within the project limits. Subsurface utility engineering included soft digs at fifty (50) designated locations to verify depths , sizes and materials of conflicting buried utilities. Cost $58,550 e.(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED Palm Beach County Water Utilities Department PROFESSIONAL CONSTRUCTION (if Lyons Road Forcemain Replacement -Phase II SERVICES aoolicable) 2018 N/A (3)BRIEF DESCRIPTION (scope, size, cost, etc.} and SPECIFIC ROLE X Check if project performed with current firm Route survey and utility locates within existing right-of-way. COST: $12,750. f.(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED City of Margate 2018 Water Main Improvements PROFESSIONAL CONSTRUCTION (if Margate, Florida SERVICES applicable) 2016 Onooino (3)BRIEF DESCRIPTION (scope, size, cost, etc.} and SPECIFIC ROLE X Check if project performed with current firm Route survey including location of all above ground features and visible improvements within the existing right-of- way. Establish survey baseline, cross sections and vacuum excavation test holes to verify location of buried utilities. COST: $46,250. g.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED Seacoast Utility Authority -Northlake Boulevard/US1 Water PROFESSIONAL CONSTRUCTION (if and Sewer force Main Replacement SERVICES aoolicable) Jupiter , Florida 2018 N/A (3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPEC IFIC ROLE X Check if project performed with current firm Route survey along Northlake Boulevard and US-1 (approx. 2.8 miles) including identification of right-or-way, property lines, above ground improvements, utility easements, tee survey, cross sections and subsu rface utility engineering (utility locates). Cost $203,325. h.(1) TITLE AND LOCATION (City and State)(2} YEAR COMPLETED Village of Bal Harbour PROFESSIONAL CONSTRUCTION (if Bal Harbour, Florida SERVICES applicable} 2016 N/A (3)BRIEF DESCRIPTION (scooe, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm Various survey mapping and construction projects for the expansion and/ or rehabilitation of utilities, acting as the village engineers. Projects include Collins Ave. (SR A-1-A) from 73rd street to 96th street and 96 th street to the Haulover cut (approximately three (3) miles). Also included is ongoing surveying as needed and a major route survey for the rehabilitation of the Vi llage of Bal Harbour utility system and roadways. (approximately three (3) miles). Cost: $22,000. i. j. k. I. m. (1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED Palm Beach Water Utilities Department PROFESSIO NAL CONSTRUC TION (if Lake Region WTP No. 11 Utility Locates SERVICES aoolicable) Palm Beach County, Florida 2015 N/A (3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm Survey and subsurface utility engineering to locate existing utilities at water treatment plant for record drawing update. Utility locates included establishing benchmarks, horizontal control, depth, size, material and utility type. COST: $74,928. (1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED Brickell Citi Center PROFESSIONAL CONSTRUC TION (if Miami Dade County, Florida SERVICES aoolicable) 2012 N/A (3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm Surveying mapped above and below ground utilities based on radar tomography and traditional sue methods on site and off site. The project is in downtown Miami between Miami Ave. And 151 on 6th, 7th and 8th streets. COST: $110,000. (1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED Town of Golden Beach PROFESSIONAL CONSTRUCT ION (if Golden Beach, Florida SERVICES applicable) 2012 NIA (3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm Surveying within the rights of ways of golden beach drive, out to the three islands and along Collins Ave. (SR A-1- A)for drainage improvements due to major flooding issues; total roadway reconstruction; undergrounding of all utilities; water main replacement and miscellaneous surveys, as needed. Route spanned approximately three (3) miles. COST: $1,000,000 (1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED Interstate 1595 PROFESSIONAL CONSTRUCTION (if Broward County, Florida SERVICES aoolicable) 2011 NIA (3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm Surveying mapped above and below ground utilities based on radar tomography and traditional sue methods on site and off site. Specific areas were requested by the project engineer based on anticipated utility conflicts. COST: $1,100,000. (1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED Town of Golden Beach Boundary Survey PROFESSIONAL CONSTRUCTION (if Golden Beach, Florida SERVICES applicable) 2011 N/A (3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm CAS Survey was tasked with providing the Map of Topographic Survey/Route Surveys within the corridors specified. All visible improvements, as well as above and below ground utilities and drainage were identified. Additionally, all trees (4" or greater) and landscaped areas to 10 feet outside each right of way line were located and shown. Utility test hole locations included. Cost: $8, 180 n.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED City of Sweetwater Stormwater Pump Station Improvements PROFESSIONAL CONSTRUCTION (if -Phase IV SERVICES aoolicable) Sweetwater, Florida 2011 2014 (3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm Due to repetitive, historical flooding within the 138 acre residential area, Phase IV Stormwater Improvements for the City of Sweetwater received substantial HMGP funding from FEMA. The projects consisted of 130 structures, 10,795 linear feet of drainage pipe ranging in size from 15-inch to 72-inch, 1,506 linear feet of 30-inch force main and 2-triplex pumping stations (28 HP). Design fees for the project were $403,151. The $4.09M project began in May 2011 and was completed in January 2014 with no liquidated damages. Work included surveying, utility easement acquisition, utility locating, FEMA grant applications, planning, design, cost estimates, preparation of construction plans and contract documents, permitting, bidding, construction management and limited engineering services during construction. The project was inspected and certified by the City Engineer's office. o. (1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED Spring Lake Improvement District PROFESSIONAL CONSTRUCTION (if Stormwater Pump Station Rehabilitation SERVICES aoolicable) Sebring, Florida 2015 2018 (3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm Survey for the rehabiliation of a 50-year old stormwater pump station located at the District's eastern boundary service area. Work included replacement of the four (4) stormwater pump 54-inch diameter discharge pipes which were leaking. Additional pump station upgrades included replacement of the electrical control panel, installation of a data flow SCADA system, a new emergency generator with automatic transfer switch (ATS), rehabilitation of the two (2) diesel driven stormwater pumps and replacement of the belt drives of the two (2) electric stormwater pumps. Also the pump station building lights, level controls and security systems were replaced. Lastly, the building interior was painted, the perimeter chain link fence replaced and the existing canal bank was reshaped and rip rap material installed. CAS prepared the record drawings. Total project design cost (including construction management) was $125,000 and total construction cost was $404,477. E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) 12.NAME Michael Marenco 13.ROLE IN THIS CONTRACT CADD Operations Manager 15.FIRM NAME AND LOCATION (City and State) Craig A. Smith and Associates, Inc. Boca Raton, Florida 16.EDUCATION (DEGREE AND SPECIALIZATION) Sheridan Technical 14.YEARS EXPERIENCE a.TOT AL b. WITH CURRENT FIRM 15 15 17.CURRENTLY PROF ESSIONAL REGISTRATION {STATE AND DISCIPLINE) 18.OTHER PROFESSIONAL QUALIFICATIONS (Pub lications, Organization, Training, Awards, etc.) Architectural Draftsman in AutoCAD Civil Draftsman in Au toCAD Survey Draftsman in AutoCAD a. 19.RELEVANT PROJECTS (1)TITLE AND LOCATION (City and State) Village of Bal Harbour Bal Harbour, Florida 2 YEAR COMPLETED PROFESSIONAL CONSTRUCTION (if SERVICES a licable 2015 2017 3 BRIEF DESCRIPTION sea e, size, cost, etc. and SPECIFIC ROLE x Check if pro·ect erformed with current firm The creation of specific purpose survey as well as plan and profile civil engineering design plans and an updated survey record as-built for a newer gravity sewer system and triplex submersible wastewater pump station. b.(1) TITLE AND LOCATION (City and State) Village of Bal Harbour 2 YEAR COMPLETED PROFESSIONAL CONSTRUCTION (if Bal Harbour, Florida SERVICES a licable 2011 2013 3 BRIEF DESCRIPTION sea e, size, cost, etc. and SPECIFIC ROLE x Check if pro·ect performed with current firm The creation of specific purpose survey along with the plan and profile civil engineering design plans and a record as-built for newer water main system. c.(1) TITLE AND LOCATION (City and State) Stormwater Master Plan Town of Golden Beach, Florida 2 YEAR COMPLETED PROFESSIONAL CONST RUCTION (if SERVICES a licable 2001-2003 NIA 3 BRIEF DESCRIPTION sea e, size, cost, etc. and SPECIFIC ROLE X Check if pro·ect performed with current firm The creation of specific purpose survey as well as the digital and hard copy plan and profile civil engineering plans and updated record as-builts as part of a design team for a collaborative digital end product. d.(1) TITLE AND LOCATION (City and State) Stormwater Multiple Phase Improvements City of Sweetwater, Florida 2 YEAR COMPLETED PROFESSIONAL CONST RUCTION {if SERVICES a licable 1998-2011 2000-2014 3 BRIEF DESCRIPTION sea e, size, cost, etc. and SPECIFIC ROLE x Check if pro·ect performed with current firm The creation of specific purpose survey as well as plan and profile civil engineering design plans and a record as­ built for newer stormwater drainage system. e.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED Multiple Lift Station Renovations PROFES SIONAL CONST RUCTION (if City of Margate, Florida SERVICES aoolicable) 2001 -Onaoina Onaoina (3)BRIEF DESCRIPTION (scooe, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm The creation of civil engineering plans and mechanical engineering design plans for the rehabilitation of eight (8) wastewater lift stations throughout the city. f.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED Radar Tomography Subsurface Utility Map PROFESSIONAL CONST RUCTION (if Broward County Courthouse SERVICES aoolicable) 2012 NIA (3)BRIEF DESCRIPTION Cscooe, size, cost, etc.) and SPECIFIC ROLE X Check if proiect performed with current firm The creation of an updated 3D model consisting of all subsurface features to be used as a base file in the future design of new facilities by others. E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) 12.NAME James Driscoll 13.ROLE IN THIS CONTRACT Director of Subsurface Utility Engineering (SUE) 15.FIRM NAME AND LOCATION (City and State) Craig A. Smith and Associates, Inc. Boca Raton, Florida 16.EDUCATION (DEGREE AND SPECIALIZATION) 14.YEARS EXPERIENCE a.TOT AL b.WITH CURRENT FIRM 32 29 17.CURRENTLY PROFESSIONAL REGISTRATION STATE AND DISCIPLINE 18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organization, Training, Awards, etc.) CADD Centers of Florida -CADD Technician; Traffic Safety in the Workplace, FOOT; Metro Tech -9890 XT Operator; MALA Geosciences -Ground Penetrating Radar Theory; MALA Geosciences -GPR Scanning Techniques; MALA Geosciences -Easy Locator & RAMAC X3M 0 erator; National Utilit Locatin Contractors Association NUCLA 19.RELEVANT PROJECTS a.(1) TITLE AND LOCATION (City and State) General Subsurface Utility Services Town of Jupiter, Florida 2 YEAR COMPLETED PROFESSIONAL CONSTRUCTION (if SERVICES a licable On oin N/A 3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE X Check if pro·ect performed with current firm Continuing contract for utility locating services for the Town's service area on an as-needed basis. b.(1) TITLE AND LOCATION (City and State) General Subsurface Utility Services Town of Davie, Florida 2 YEAR COMPLETED PROFESSIONAL CONST RUCTION (if SERVICES a licable On oin N/A 3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE X Check if ro·ect performed with current firm Currently contracted with Town of Davie to perform complete subsurface utility services of the town's existing water, sanitary sewer, force main, reclaimed water and street lighting infrastructure. Provides Town with project specific locates and soft dig information since 2003. Average annual fee of $90,500. c.(1) TITLE AND LOCATION (City and State) General Subsurface Utility Services City of Coconut Creek, Florida 2 YEAR COMPLETED PROFESSIONAL CONSTRUCTION (if SERVICES a licable On oin N/A 3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE X Check if pro·ect performed with current firm Continuing contract for utility locating services for the City's service area on an as-needed basis. d.(1) TITLE AND LOCATION (City and State) General Subsurface Utility Services Martin County, Florida 2 YEAR COMPLETED PROFESSIONAL CONSTRUCTION (if SERVICES a licable 2015-2019 N/A 3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE X Check if ro·ect performed with current firm Continuing contract for utility locating services for the County's service area on an as-needed basis. e.(1) TITLE AND LOCATION (City and State) General Subsurface Utility Services City of Hollywood, Florida 2 YEAR COMPLETED PROFESSIONAL CONSTRUCTION (if SERVICES a licable On oin N/A 3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE X Check if pro·ect performed with current firm Continuing contract for utility locating services for the County's service area on an as-needed basis. f.(1) TITLE AND LOCATION (City and State)(2} YEAR COMPLETED General Subsurface Utility Services PROFESSIONAL CONSTRUC TION (if City of Cooper City, Florida SERVICES aoolicable) 2008-2019 N/A (3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm Continuing contract for utility locating services for the County's service area on an as-needed basis. g.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED Bal Harbour Village PROFESSIONAL CONSTRUCTION (if Bal Harbour Village, Florida SERVICES aoolicable) 2014 2016 (3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm Various survey mapping and utility locates for construction projects for the expansion and/or rehabilitation of utilities (pipelines and wastewater lift stations), acting as the Village Engineers, projects include Collins Avenue (SR A1A) from 73 rd Street to 96th Street and 96 th Street to the Haulover cut (approximately 3 miles) and rehabilitation of Lift Station No. 1 and installation of Lift Station No. 3. Also included is ongoing surveying and utility locates as needed and a major route survey for the rehabilitation of the Village utility system and roadways (approximately 3 miles lineally). h.(1) TITLE AND LOCATION (City and State)(2} YEAR COMPLETED AECOM/DRAGADOS PROFESSIONAL CONSTRUCTION (if Fort Lauderdale, Florida SERVICES aoolicable) 2010 NIA (3) BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm Specific purpose survey and subsurface utility engineering services enhanced with 3D Radar Tomography in advance of construction activities. Performed over 1 M square feet of 3D, RT, GPR, EM locating and 750 vacuum excavation soft digs to assist in identifying potential conflicts between existing subsurface systems and numerous proposed bridge column and sign foundations. i.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED Regional Water Reclamation Facility PROFESSIONAL CONSTRUCTION (if West Palm Beach, Florida SERVICES applicable) 2019 N/A (3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm CAS performed Subsurface Utility Engineering services as a subconsultant to Hazen & Sawyer, Inc. for the City of West Palm Beach East Central Regional Water Reclamation Facility. The scope of work included survey to establish horizontal control, benchmarks and locating all pertinent above ground visible improvements and utilities within the project area. Utility surface designation and mapping was performed utilizing 2D Ground Penetrating Ra dar, 3D Radar Tomography scanning and calibration soft digs for approximately 260,000 ft2 of the facility to identify types, sizes and locations of buried utilities. Deliverables included full electronic files containing CAD, survey data and imagery collected and scanning performed for this project. All files were compatible with the Civil 3D CADD platform. Total project cost was $36,330. j. (1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED Seminole Pratt-Whitney Road/Northlake Water and Force PROFESSIONAL CONSTRUCTION (if Main Improvements SERVICES aoolicable) Palm Beach County, Florida 2019 N/A (3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm CAS performed subsurface utility engineering as a subconsultant to Chen Moore & Associates, Inc. for the Palm Beach County Water Utilities Department. The scope of work included soft digs at forty (40) designated locations to verify depths, sizes and materials of conflicting buried utilities for the design of a water main replacement along Seminole Pratt-Whitney Road between Orange Boulevard and 88th Street. Total project cost was $24,875. I I I E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14.YEARS EXPERIENCE 12. NAME ALAN LOPEZ 13.ROLE IN THIS CONTRACT SUE FIELD SUPERVISOR a. TOTAL b.WITH CURRENT FIRM 19 12 15.FIRM NAME AND LOCATION (City and State) CRAIG A. SMITH & ASSOCIATES BOCA RATON, FLORIDA 16. EDUCATION (DEGREE AND SPEC/ALIZA TIONJ 17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organization, Training, Awards, etc.) IMSA WORK ZONE SAFETY CERTIFICATION METRO TECH -THEORIES OF SUBSURFACE DESIGNATING MALA GEOSCIENCES -GROUND PENETRATING RADAR THEORY MALA GEOSCIENCES -GPR SCANNING TECHNIQUES MALA GEOSCIENCES -EASY LOCATOR & RAMAC X3M OPERATOR NATIONAL UTILITY LOCATING CONTRACTORS ASSOCIATION (NULCA) a. C. b. 19.RELEVANT PROJECTS 1) TITLE AND LOCATION (CITY AND STATE) 12) YEAR COMPLETED CITY OF POMPANO BEACH PROFESSIONAL SERVICES CONSTRUCTION (IF APPLICABLE SW 2ND STREET DRAINAGE SURVEYING AND MAPPING 2018 TBD 3) BRIEF DESCRIPTION (brief scope, size, cost, etc.) AND SPECIFIC ROLE x CHECK IF PROJECT PERFORMED WITH CURRENT FIRM ROUTE SURVEY INCLUDING ALL ABOVE GROUND FEATURES WITHIN EXISTING RIGHT-OF-WAY AND OFF-SITE SURVEYING OF CRITICAL DRAINAGE STRUCTURES. SCOPE OF WORK INCLUDES 20 GRP UTILITY LOCATES WITHIN THE PROJECT CORRIDOR (SW 2 No STREET BETWEEN DIXIE HIGHWAY AND CYPRESS ROAD, SW 15T AVENUE BETWEEN SW 2ND STREET AND ATLANTIC BOULEVARD, ANO SW 1 sT TERRACE & COURT BETWEEN SW 2No STREET AND SOUTH CYPRESS ROAD). COST: $22,300 1) TITLE AND LOCATION (CITY AND STATE) (2) YEAR COMPLETED CITY OF HOLLYWOOD UTILITIES PROFESSIONAL SERVICES CONSTRUCTION (IF APPLICABLE) HOLLYWOOD, FLORIDA ONGOING NIA (3) BRIEF DESCRIPTION (brief scope, size, cost, etc.) AND SPECIFIC ROLE x CHECK IF PROJECT PERFORMED WITH CURRENT FIRM COMPLETE RESPONSIBILITY FOR PROVIDING ONE CALL UTILITY LOCATES FOR CITY OWNED WATER, SEWER, RECLAIM, STREETS LIGHTS AND MONIR POWER FACILITIES. COST: $200,000+ANNUALL Y (1) TITLE AND LOCATION (CITY AND STATE) 12) YEAR COMPLETED PROFESSIONAL SERVICE! CONSTRUCTION (IF APPLICABLE) PALM BEACH COUNTY WATER UTILITIES SURVEYING AND MAPPIN( 2019 NIA SEMINOLE PRATT-WHITNEY ROAD/NORTHLAKE WATER AND FORCE MAIN IMPROVEMENTS PALM BEACH, FLORIDA 3) BRIEF DESCRIPTION (brief scope, size, cost, etc.) AND SPECIFIC ROLE x CHECK IF PROJECT PERFORMED WITH CURRENT FIRM PERFORMED SUBSURFACE UTLITY ENGINEERING USING GPR AND 40 VACUUM EXCAVATIONS FOR WATER AND FORCE MAIN IMPROVEMENTS. COST: $24,875 I 1) TITLE ANO LOCATION {CITY AND STA TE:) (2) YEAR COMP LETEDBROWARD COUNTY ENGINEERING PROFESSIONAL SERVICES CONSTRUCTION (IF APPLICABLE) WILES ROAD IMPROVEMENTS 2019 NIA c.BROWARD COUNTY FLORIDA 3) BRIEF DESCRIPTION (brief scope, size, cost, etc.) ANO SPECIFIC ROLE x CHECK IF PROJECT PERFORMED WITH CURRENT FIRM PERFORMED SUBSURFACE UTILITY ENGINEERING USING GRP & 100 VACUUM EXCAVATIONS ON EXISTING BURIED UTILITIES FOR PAVING AND DRAINAGE IMPROVEMENTS. COST $54,000 I 1) TITLE ANO LOCATION {CITY AND STA TE:) 12\ YEAR COMPLETED CITY OF MIAMI BEACH PROFESSIONAL SERVICES CONSTRUC TION (IF APPLICABLE LIGHT RAIUMODERN STREETCAR PROJECT SURVEYING AND MAPPING 2016 NIA e. MIAMI BEACH, FLORIDA 3) BRIEF DESCRIPTION (brief scope, size, cost, etc.) ANO SPECIFIC ROLE x CHECK IF PROJECT PERFORMED WITH CURRENT FIRM MAP OF TOPOGRAPHIC SURVEY/ROUTE SURVEYS ADHERING TO THE MIAMI BEACH PUBLIC WORKS MANUAL -SECTION 1A - SURVEYING STANDARDS AND REQUIREMENTS ALONG THE CORRIDORS. ALL VISIBLE IMPROVEMENTS WERE LOCATED AND SHOWN. ABOVE AND BELOW GROUND UTILITIES AND DRAINAGE WERE IDENTIFIED AS WELL AS TREES AND LANDSCAPED AREAS TO 25 FEET OUTSIDE EACH RIGHT OF WAY LINE. CROSS-SECTIONS WERE TAKEN AT 50-FOOT INTERVALS. ELEVATIONS AT ENTRY THRESHOLDS OF STRUCTURES WERE ALSO PROVIDED. COST: $300,000(+) I 1) TITLE AND LOCATION (CITY AND STA TE:) 12)YEAR COMPLETEDTOWN OF DAVIE UTILITIES PROFESSIONAL SERVICES CONSTRUCTION (IF APPLICABLE) f. BROWARD COUNTY, FLORIDA ONGOING NIA 3) BRIEF DESCRIPTION (brief scope, size, cost, etc.) ANO SPECIFIC ROLE x CHECK IF PROJECT PERFORMED WITH CURRENT FIRM I COMP LETE RESPONSIBILITY FOR PROVIDING ONE CALL UTILITY LOCATES FOR CITY OWNED WATER, SEWER, RECLAIM, STREETS LIGHTS AND MONIR POWER FACILITIES. COST: $150,000+ANNUALLY I 1) TITLE ANO LOCATION {CITY AND STA TE:) 12) YEAR COMPLETED UNITED STATES NAVY PROFESSIONAL SERVICES CONSTRUCTION (IF APPLICABLE) h. NAVAL AIR STATION KEY WEST 2018 NIA MONROE COUNTY, FLORIDA 3) BRIEF DESCRIPTION {brief scope, size, cost, etc.) ANO SPECIFIC ROLE x CHECK IF PROJECT PERFORMED WITH CURRENT FIRM COMP LETE RESPONSIBILITY FOR ALL UTILITY LOCATES AND SUBSURFACE UTILITY ENGINEERING FOR US NAVY FACILITIES AT ALL BASE AREAS AND ANNEXES IN AND AROUND NAVAL AIR STATION KEY WEST INCLUDING, WATER, SEWER, RECLAIM, BRINE, FIBER OPTIC, ALL ELECTRIC (PRIMARY, FEEDER, SECONDARY & SERVICE LINES), STREET LIGHTING, SCADA, AND SECURE COMMUNICATION LINES COST: $75,000+ANNUALL Y 1) TITLE AND LOCATION {CITY AND STATE:) /2l YEAR COMPLETED PALM BEACH COUNTY WATER UTILITIES DEPARTMENT PROFESSIONAL SERVICES CONSTRUCTION (IF APPLICABLE L VONS ROAD FORCE MAIN REPLACEMENT -PHASE II SURVEYING AND MAPPING 2018 NIA i. 3) BRIEF DESCRIPTION {brief scope, size, cost, etc.) ANO SPECIFIC ROLE x CHECK IF PROJECT PERFORMED WITH CURRENT FIRM ROUTE SURVEY AND UTILITY LOCATES WITHIN EXISTING RIGHT-OF-WAY. COST: $12,750 E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) 12.NAME Tony Gomes 13.ROLE IN THIS CONTRACT Senior Field Representative 14.YEARS EXPERIENCE a.TOT AL b.WITH CURRENT FIRM 42 36 15.FIRM NAME AND LOCATION (City and State) Craig A. Smith and Associates, Inc. Boca Raton, Florida 16.EDUCATION (DEGREE AND SPECIALIZATION) A.A. Business Management 17.CURRENTLY PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Universit of Massachusetts, Amherst 18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organization, Training, Awards, etc.) Survey Courses -University of Miami Licensure -As halt Plant Tech FOOT #R-1712, As halt Roadwa Tech FOOT #5659 19.RELEVANT PROJECTS a.(1) TITLE AND LOCATION (City and State) Golden Beach Capital Improvement Project Golden Beach, Florida 2 YEAR COMPLETED PROFESSIONAL CONSTRUCTION (if SERVICES a licable b. C. 2008 2012 3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE x Check if project performed with current firm Responsible for daily construction observation/inspection of $17 .5 million project including stormwater, water main, electrical, pavement, sidewalk and landscaping improvements. (1)TITLE AND LOCATION (City and State) Sunshine Water Control District (SWCD) West Outfall Canal Improvements Coral Springs, Florida 2 YEAR COMPLETED PROFESSIONAL CONSTRUCTION (if SERVICES a licable 3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE X Check if pro·ect performed with current firm Conceptual hydraulic modeling of a 2-mile primary canal of the SWCD. Phase 1 design, permitting, modeling, bidding, community outreach, and construction management of the $3 million project. (1)TITLE AND LOCATION (City and State) Stormwater Ponds Bank Repairs Walnut Creek Community Development District (WCDD) Pembroke Pines, Florida 2 YEAR COMPLETED PROFESSIONAL CONSTRUCTION (if SERVICES a licable 3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE x Check if pro·ect performed with current firm Responsible for daily construction observation/inspection of 18,216 linear feet of geofabric tubes, 103,000 plants and 15,000 square yards of sod. Construction cost were $594,600. d. (1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED NE 174th Street Stormwater and Pavement Improvements PROFESSIONAL CONSTRUCTION (if Sunny Isles Beach, Florida SERVICES aoolicable) 2014 2017 (3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm Responsible for daily construction observation/inspection, pay applications and project closeout for the restoration of 0.2 miles of roadway and drainage improvements. Construction costs totaled $2.14 million. e. (1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED Capital Improvement Project phase Ill & IV Stormwater PROFESSIONAL CONST RUCTION (if Collection System with Master Pump Station SE RVICES applicable) Golden Beach, Florida 2009 2011 (3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm Responsible for daily construction observation/inspection of the stormwater improvements for Phases II and IV consisting of a stormwater master pumping station with submersible pumps, 14,500 linear feet of DIP drainage pipe and force main (ranging in size from 16" to 72"), 205 drainage structures and 7 outfalls. Design costs for the oroiect were $1,263,240. Total construction costs were $7,667,276. E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) 12.NAME William Tanto 13.ROLE IN THIS CONTRACT Senior Field Representative 15.FIRM NAME AND LOCATION (City and State) Craig A. Smith and Associates, Inc. Boca Raton, Florida 16.EDUCATION (DEGREE AND SPECIALIZATION) Atlantic Vocational Technical Center 14.YEARS EXPERIENCE a.TOT AL b.WITH CURRENT FIRM 26 24 17.CURRENTLY PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) 18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organization, Training, Awards, etc.) •FOOT Construction, Qualifications •FOOT - Construction OSHA Awareness Safety Training •FDEP Stormwater Erosion & Sedimentation Control Inspector No. 15102 19.RELEVANT PROJECTS a. (1)TITLE AND LOCATION (City and State)2 YEAR COMPLETED Capital Improvements Project Phase II and IV Stormwater PROFESSIONAL CONSTRUCTION (if Collection System with Master Pump Stations SERVICES a licable Golden Beach, Florida 2009 2011 3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE X Check if project performed with current firm Responsible for daily construction observation/ inspection of the stormwater improvement phase phases II and Iv consisting of a stormwater master pumping station with submersible pumps, 14,500 linear feet of DIP drainage pipe and force main (ranging in size from 16" to 72"), 205 drainage structures and 7 outfalls. Design costs for the project were $1,263,240. Total construction costs were $7,667,276. b. (1)TITLE AND LOCATION (City and State) Lake Osborne Estates Water Replacement Ph 1 Expansion Lake Worth, Florida 2 YEAR COMPLETED PROFESSIONAL CONSTRUCTION (if SERVICES a licable 2020 3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE X Check if pro·ect performed with current firm Responsible for daily construction observation I inspection, pay application, and project close out for the Phase 1 expansion improvements which include the installation of an additional 1,500 linear feet of new 6"-8" PVC water main serving 41 homes in the Lake Osborne Estate residential area along Lake Geneva Drive, Lake Osborne Drive, Nanette Court and High Ridge Road. The new water main will replace existing asbestos cement pipe (ACP) and also improve fire protection and pressures to the neighborhood residences. Work also includes the abandonment of 2,650 linear feet of existing ACP water mains and the relocation of meters and services from the rear of the residential lots to the front of the lots. Additional services include public outreach and existing permit modifications. CAS, through public informational meetings, has familiarized homeowners with the project scope and involved homeowners during the design process by incorporating design elements such as location of water service lines and meter box location preferences on their property and shall address any other concerns during the construction phase. Design costs are $96,400 and estimated construction costs are $300,000. The project was approved by the City as a change order to the existing Phase I construction contract. C.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED City-County Public Works Avenue L, M, N & 4th Street PROFESSIONAL CONSTRUCTION (if Sanitary Sewer Improvements SERVICES aoolicable) Glades County, Florida 2014 2016 (3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm Responsible for daily construction observation / inspection for the installation of a duplex submersible lift station with approximately 8-foot diameter wet well and 350 linear feet of 6-inch force main along with 6,344 linear feet of 8" and 1 O" gravity sewer with seventeen (17) sanitary sewer manholes. The total design costs for the project were $52,425 with construction costs totaling $1,286,627. d.(1) TITLE AND LOCATION (City and State)(2} YEAR COMPLETED Bal Harbour Village PROFESSIONAL CONSTRUCTION (if Sanitary Sewer Improvements Phase1 SERVICES applicable) Bal Harbour, Florida 2015 2017 (3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm Responsible for the daily construction observation I inspection for the installation of a new triplex submersible pump station with a 12 diameter wet well, control panel, automatic transfer switch receptacle, emergency generator, and all associated appurtenances, in addition to approximately 1,350 linear feet of 18" gravity sewer lines to the pump station. The project design cost was $182,804. Construction cost was $2,970,000. e. (1)TITLE AND LOCATION (City and State)(2) YEAR COMPLETED Avenue R Stormwater Improvements PROFESSIONAL CONSTRUCTION (if Moore Haven, Florida SERVICES applicable) 2016 2018 (3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm Responsible for daily construction observation I inspection for the relocation of existing utilities and the installation of 1,200 LF of plastic swale liner, 350 LF of PBC culverts, ten (1) concrete headwalls, one (1) drainage structure, 4,000 SY of sod and the regrading of 4,000 SY of swale. Construction cost was $393,304. f. (1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED Sanitary Sewer Pump Stations and Forcemain Improvements PROFESSIONAL CONSTRUCTION (if Pembroke Park, Florida SERVICES applicable) 2002 2009 (3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm Responsible for daily construction observation/ inspection for the installation of 1,500 linear feet of 10-inch force main which remained a dry line for four years until further funding became available. Remaining work included the rehabilitation of 22 lift stations, the decommissioning of 6 existing lift stations and the installation of a magmeter with telemetry system. Design fees for this project were $417,700. The project was completed in 2009 after six vears with a construction cost of $2,907,930. I F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S ' 0. EXAMPLE PROJECT KEY NUMBER 1 QUALI FICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 70 projects, if not specified. Complete one Section F for each project.) 21. TIT LE AND LOCATION (Coty and State) 22. YEAR COMPLETED NE 174th Street Stormwater and Pavement Improvements Sunny Isles Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2014 2017 23. PROJECT OWNER'S INFORMATION a.PROJECT OWNER b. POINT OF CONTACT City of Sunny Isles Beach Christopher Russo City Manager c. POI NT OF CONTACT TELEPHONE NUMBER (305)792-1776 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost} Survey, utility locates, preparation of engineering design and construction plans, stormwater modeling and calculations, cost estimates, contract documents and permitting for the Roadway Improvements Project for NE 174th Street. The project consists of a reconstruction of both the drainage and the road for approximately 0.2 miles from Collins Avenue to North Bay Road. The existing roadway system was failing due to poor soil conditions, a limited drainage system and an undersized outfall. The new roadway incorporated a reconstructed base with geotech fabric to offset the soils. The design also included a new drainage system that meets water quality requirements, site demolition, road regrading, fibre optic relocation, future conduit for telecom lines, sidewalks and paver walkways, landscaping, curbing, bike paths and parallel parking. The design was completed within two years, under budget, at a cost of $212,180. Construction of the first half of the project has been competed in 2016 with an estimated cost of $2,147,800. 25 FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2) FIRM LOCATION (City and State} (3) ROLE a. Craig A. Smith & Associates, Boca Raton, Florida Prime Consultant Inc. (1) FIRM NAME (2)FIRM LOCATION (City and State} (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State} (3) ROLE c. F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S ' QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 70 projects, if not specified. Complete one Section F for each project.) 0. EXAMPLE PROJECT KEY NUMBER 2 21. TITLE AND LOCATION (City and State) 22. YEAR COMP LETED Capital Improvements Project Phase Ill & IV Stormwater Collection System with Master Pump Stations Golden Beach, Florida PROFESSIONAL SERVICES 2009 CONSTRUCTION (If applicable) 2011 23.PROJECT OWNER'S INFORMATION d. PROJECT OWNER Town of Golden Beach e. POINT OF CONTACT Alexander Diaz Town Manaqer 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) f. POINT OF CONTACT TELEPHONE NUMBER (305)932-0744 Stormwater design, survey, utility locates, permitting, cost estimates, construction management and construction observation, survey as-builts and certifications through project close-out as part of a Town Capital Improvement Project Stormwater Improvements for Phase Ill and IV were designed and constructed to be consistent with the Town's overall Master Plan. The project consisted of a stormwater master pumping station with submersible pumps, 14,500 linear feet of DIP drainage pipe and force main (ranging in size from 16" to 72"), 205 drainage structures and 7 outfalls. Project Cost: $7,667,276 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a.Craig A. Smith & Associates,Boca Raton, Florida Prime Consultant Inc. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TE AM'S 0. EXAM PLE PROJECT KEY NUMBER QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 70 projects, if not specifted. 3 Complete one Section F for each project) 21. TITLE AND LOCATION (City and State) I 22. YEAR COMPL ETED Palm & Hibiscus Island Stormwater & Roadway Improvements Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2015 2019 23.PROJECT OWNER'S INFORMATION g. PROJECT OWNER City of Miami Beach h. POINT OF CONTACT Jeffrey Crews, P.E. (Stantec) Proiect Manaaer 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) i. POINT OF CONTACT TELEPHONE NUMBER (954)804-2715 Survey, engineering stormwater design, drainage calculations and modeling, cost estimates, permitting, and engineering services during construction for the Palm and Hibiscus Island Stormwater and Roadway Improvements. The project is a Capital Improvement Project structured as a design/build with Lanzo Construction. GAS was responsible for the drainage system, roadway design and harmonization components of the GIP. The design incorporated engineering techniques to reduce future sea level rises such as elevating the existing roadways, increasing the size of the drainage system, providing water quality, installing three (3) stormwater pump stations and backflow prevention devices to avoid extreme high tides from re-entering the systems. Work also in cluded electric and communication line conversion from overhead to underground on Hibiscus Island. Project Cost: $8,000,000 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. Craig A. Smith & Associates,Boca Raton, Florida Subconsultant Inc. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. {1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. I F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S ' QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 0.EXAMPLE PROJECT KEY NUMBER 4 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Wauchula Hills Water and Sanitary Sewer Improvements Phase IV Hardee County, Florida PROFESSIONAL SERVICES 2017 23.PROJECT OWNER'S INFORMATION CONSTRUCTION (If applicable) Ongoing a. PROJECT OWNER b. POINT OF CONTACT Park Winter c. POINT OF CONTACT TELE PHONE NUMBER Hardee County (863)773 3030 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, end cost) CAS pro vided professional engineering services for the installation of the water and sanitary sewer improvements included approximatel y 6,125 linear feet of 8" water main and 5,277 linear feet of 8" gravity sanitary sewer including connection to 51 private residences and the decommissioning of septic tanks and potable water wells. This project was funded through a multi-year special legislative appropriation. The project design costs, including construction management, were $189,628 and project construction costs totaled $1,249,013. Project construction began in March 2017 and was completed in October 2017 on schedule and under budget by $417,948. Preliminary planning, survey, design, permitting, preparation of construction plans and contract documents, assistance in securing grant funding for project, bidding, cost estimates, construction management and construction observation through project closeout. 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3)ROLE a.Craig A Smith &Boca Raton, Florida Prime Associates, Inc. (1) FIRM NAME (2)FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3)ROLE c. 277 (277) l ' F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPO SED TEAM'S ' QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 70 projects, if not specified. Complete one Section F for each project.) 0. EXAMPLE PROJECT KEY NUMBER 5 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Lift Station No. 22 Rehabilitation Margate, Florida PROFESSIONAL SERVICES 2015 23.PROJECT OWNER'S INFORMATION CONSTRUCTION (If applicable) 2016 a. PROJECT OWNER b. POINT OF CONTACT c. POINT OF CONTACT TELEPHONE NUMBER City of Margate Alberto Tor res-Soto, P.E. (954)972 0828 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost} The Lift Station No. 22 Renovation Project consists of decommissioning the existing wet pit/dry pit lift station and reinstalling a new wet well and valve vault; including the installation of all SS piping inside the proposed wet well, relining existing structures, manholes, gravity sewer, fencing, system start-up and upgrading the electrical equipment, control panel and SCADA system. The total design cost for this project was $18,488. The construction cost for this project was $571,667.25 and was completed in December 2016. Design, preparation of construction plans and contract documents, permitting, bidding, construction management and limited construction observation through project closeout/start-up services. 25 FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State} (3) ROLE a.Craig A. Smith &Boca Raton, Florida Prim e Associates, Inc. (1) FIRM NAME (2) FIRM LOCATION (City and State} (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. 132 I F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S ' QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 0.EXAMPLE PROJECT KEY NUMBER 6 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Sanitary Sewer Pump Stations & Force Main Improvem ents Pembroke Park, Florida PROFESSIONAL SERVICES 2002 23.PROJECT OWNER'S INFORMATION CONSTRUCTION (If applicable) 2009 a.PROJECT OWNER b. POINT OF CONTACT c. POINT OF CONTACT TELEPHONE NUMBER Town of Pembroke Park Howard Clark (954)966-4600 24. BRIEF DESC RIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, end cost) The Sanitary Pump Station and Force Main Improvements Project for the Town of Pembroke Park was completely funded by a Rural Development Grant. Improvements included the installation of 1,500 linear feet of 10-inch force main which remained a dry line for four years until further funding became available. Remaining work included the rehabilitation of 22 lift stations, the decommissioning of 6 existing lift stations and the installation of a magmeter with telemetry system. Design fees for this project were $417,700. The project was completed in 2009 after six years with a construction cost of $2,907,930. The project was completed within the accepted schedule and budget with no liquidated damages. Survey, utility locates, grant assistance and administration, design, preparation of construction plans and contract documents, permitting, assistance during bidding, construction management and construction observation, start-up, as­ builts and final certification through project close-out. 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2) FIRM LOCATION (City end State) (3) ROLE a. Craig A. Smith &Boca Raton, Florida Prime Associates, Inc. (1)FIRM NAME (2) FIRM LOCATION (City end State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City end State) (3) ROLE C. 74 ( I I F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S ' QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 70 projects, if not specified. Complete one Section F for each project.} 0. EXAMPLE PROJECT KEY NUMBER 7 21. TITLE AND LOCATION (City and State) Avenue R Stormwater Improvements Moore Haven, Florida 22. YEAR COMPL ETED s. PROJECT OWNER City of Moore Haven PROFESSIONAL SERVICES CONSTRU CTION (II applicable) 2016 2018 23.PROJECT OWNER'S INFORMATION t. POINT OF CONTACT Bret Whidden Mayor u. POINT OF CONTACT TELEPHONE NUMBER (863)946-0711 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, sire, and cost/ Project budget, estimating, funding procurement, surveying, GPR locating, design, permitting, contract documents, bidding assistance, engineering services during construction, construction observation services and project certification for the Avenue R Stormwater Improvements for the City of Moore Haven. The city continues to address flooding and water quality issues by improving its existing conveyance systems with upgrades to existing swales, box culverts, flow efficiency devices, drainage apparatuses and stormwater pump stations. This phase of stormwater improvements involved the relocation of existing utilities and the installation of 1,200 LF of plastic swale liner (1/4 section of 12-inch ID smooth inner wall perforated black P.E. pipe), 350 LF of PVC culverts, ten (10)concrete headwalls, one (1) drainage structure, 4,000 SY of sod and the regrading of 4,000 SY of swale. This project was funded using state grants secured with the help of GAS and GAS Governmental Services. Project Cost: $393,304 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State/ (3) ROLE a.Craig A. Smith & Associates,Boca Raton, Florida Prime Consultant Inc. (1) FIRM NAME (2) FIRM LOCATION (City and State/ (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State/ (3) ROLE C. F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S ' QUA Li FiCA TIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 70 projects, if not specified. Complete one Section F for each project.} 0. EXAMPLE PROJECT KEY NUMBER 8 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Stormwater & Pump Station Improvements Phase IV Sweetwater, Florida PROFESSIONAL SERVICES 2011 CONSTRUCTION (If applicable) 2013 23. PROJECT OWNER'S INFORMATION v. PROJECT OWNER City of Sweetwater w.POINT OF CONTACT Eric Gomez, P.E. City EnQineer 24. BRIEF DESCR IPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) x. POINT OF CONTACT TELEPHONE NUMBER (305)553-5457 Provided su rveying, utility locating, FEMA grant applications, planning, design, cost estimates, preparation of construction plans and contract documents, permitting, bidding, construction management and limited engineering services during construc tion. The project was inspected and certified by the City Engineer's office. Due to repetitive, historical flooding within the 138 acre residential area, Phase IV Stormwater Improvements for the City of Sweetwater received substantial HMGP funding from FEMA. The projects consisted of 130 structures, 1 0, 795 linear feet of drainage pipe ranging in size from 15-inch to 72-inch, 1,506 linear feet of 30-inch force main and two (2)triplex stormwater pumping stations (28 HP). Project Cost: $4,090,000 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City end State} (3) ROLE a. Craig A. Smith & Associates, Boca Raton, Florida Prime Consultant Inc. (1) FIRM NAME (2) FIRM LOCATION (City end State} (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City end State} (3) ROLE C. F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S ' QUALIFICATIONS FOR THIS CONTRACT 0. EXAMPLE PROJECT KEY NUMBER 9 (Pres ent as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION {City an d State) 22. YEAR COMPLETED SW 52nd Avenue (North) Roadway and Drainage Improvements PROFESSIONAL SERVICES CONSTRUCTION Ill applicable) Pembroke Park, Florida 2009 2010 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT Howard Clark c.POINT OF CONTACT TELEPHONE NUMBER Town of Pembroke Park 954 966-4600 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, end cost) The Town of Pembroke Park SW 52nd Avenue (North) Project was the second phase of a roadway and drainage project. The project consisted of approximately 2,400 linear feet of new roadway (south of Hallandale Beach Boulevard), 2,200 linear feet of 36" HOPE pipe and exfiltration trench and 14 inlets. The project was funded through a CDBG grant for $844,200. The project included a change order for $580,000 when additional grant funds became available and the scope of work expanded. Design fees for this project totaled $206,594. The project was completed in May 201 o within the accepted schedule with no liquidated damages. Survey, utility locates, design, cost estimates, preparation of construction plans and contract documents, permitting, bidding, construction management and construction observation, survey as-builts and certification through project close­ out. Project Cost: $844,200 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. b. c. 83 (1)FIRM NAME Craig A. Smith & Associates, Inc. (1) FIRM NAME (1) FIRM NAME (2) FIRM LOCATION {City end State} (3)ROLE Boca Raton, Florida Prime Consultant (2) FIRM LOCATION {City and State} (3)ROLE (2) FIRM LOCATION {City end State} (3)ROLE i I F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S ' QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 70 projects, if not specified. Complete one Section F for each project.} 0.EXAMPLE PROJECT KEY NUMBER 10 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED SW 2 nd Street Drainage Improvements Pompano Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Ongoing Ongoing bb. PROJECT OWNER City of Pompano Beach 23.PROJECT OWNER'S INFORMATION cc. POINT OF CONTACT Tammy Good Eni:1ineerini:1 Project Manaaer dd. POINT OF CONTACT TELEPHONE NUMBER (954)786-5520 24. BRIEF DES CRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, end cost) Survey, utility locates, geotechnical engineering, engineering drainage analysis, preparation of preliminary engineering design and construction plans, cost estimates, contract documents and assistance during bidding, shop drawing review, construction observation and engineering services during construction, and certification through project closeout for the SW 2nd Street Drainage Improvements project which is located between Dixie Highway and Cypress Road and south of Atlantic Boulevard within the City's Government District. The project also includes a proposed stormwater system on SW 1st Avenue and SW 1st Court. The 0.43 miles of roadway are to be designed to alleviate existing flooding concerns with the possibility of an offsite discharge to a nearby canal. Project Cost: $550,000 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2)FIRM LOCATION (City and State) (3) ROLE a.Craig A. Smith & Associates, Boca Raton, Florida Prime Consultant Inc. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2)FIRM LOCATION (City and State) (3) ROLE C. I F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S ' QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 70 projects, if not specified. Complete one Section F for each project.} 0.EXAMPLE PROJECT KEY NUMBER 11 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED Water Distribution System Improvements Miami County, Florida PROFESSIONAL SERVICES 2007 23. PROJECT OWNER'S INFORMATION CONSTRUCTION (If applicable) 2015 a. PROJECT OWNER b.POINT OF CONTACT c.POINT OF CONTACT TELE PHONE NUMBER Miccosukee Tribe of Indians of Florida Howard Jim, Utility Director 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size. and cost) (305)223 8380 The water system improvements for the Miccosukee Tribe of Indians of Florida included expansion of the tribe's water distribution system including 15,000 feet of 12-inch water mains and rehabilitation of existing elevated storage tank piping. Total design costs for the project were $516,000. Total construction costs were $2,580,000. The project began in 2007 and was completed in June 2015. Planning, surveying, utility locates, design, hydraulic analysis, permitting and engineering services during construction. 25 FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2)FIRM LOCATION (City and State) (3) ROLE a.Craig A. Smith &Boca Raton, Florida Prime Associates, Inc. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3) ROLE b. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3) ROLE C. 37 I I F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S ' QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 0. EXAMPLE PROJECT KEY NUMBER 12 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Stormwater Pump Station Rehabilitation Sebring, Florida PROFESSIONAL SERVICES 2015 23.PROJECT OWNER'S INFORMATION CONSTRUCTION (If applicable) 2018 a. PROJECT OWNER b. POINT OF CONTACT c. POINT OF CONTACT TELEPHONE NUMBER Spring Lake Improvement District Joe DeCerbo 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) (863)655 1715 The scope of work consisted of the rehabiliation of a 50-year old stormwater pump station located at the District's eastern boundary service area. Work included replacement of the four (4) stormwater pump 54-inch diameter discharge pipes which were leaking. Additional pump station upgrades included replacement of the electrical control panel, installation of a data flow SCADA system, a new emergency generator with automatic transfer swiitch (ATS), rehabilitation of the two (2) diesel driven stormwater pumps and replacement of the belt drives of the two (2) electric stormwater pumps. Also the pump station building lights, level controls and security systems were replaced. Lastly, the building interior was painted, the perimeter chain link fence replaced and the existing canal bank was reshaped and rip rap material installed. The total project design cost (including construction management) was $125,000 and total construction cost was $404,477. Site survey, design, geotechnical analysis, cost estimates, permitting, preparation of construction plans, contract documents, bidding assistance and construction management services through project close-out. 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a.Craig A. Smith &Boca Raton, Florida Prime Associates, Inc. (1 I FIRM NAME (2) FIRM LOCATION (City and State/ (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. 89 ! F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S ' QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 0. EXAMPLE PROJECT KEY NUMBER 13 21. TITLE AND LOC ATION (City and State) 22. YEAR COMPLETED Avenue L, M, N & 4th Str. Sanitary Sewer Improvements PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Glades County, Florida 2014 2016 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER b.POINT OF CONTACT c. POINT OF CONTACT TELEPHONE NUMBER City-County Public Works David Miller (863)946-0711 24. BRIEF DESCRIPTION OF PROJECT ANO RELEVANCE TO THIS CONTRACT (Include scope, size, end cost) The City-County Public Works Authority (CCPWA) Avenue L, M, N and 4th Sewer Lift Station Improvements includes the installation of a duplex submersible lift station with approximately 8-foot diameter wet well and 350 linear feet of 6-inch force main along with 6,344 linear feet of 8" and 1 0" gravity sewer with seventeen (17) sanitary sewer manholes. The total design costs for the project were $52,425 with construction costs totaling $1,286,627. The project was designed and permitted in September 2014 and construction was completed in March 2016. The project was partially funded by state legislative appropriation. Design, survey, permitting, preparation of construction plans and contract documents, assistance during bidding, engineering services during construction and construction management. 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2) FIRM LOCATIO N (City and State) (3)ROLE a.Craig A. Smith &Boca Raton, Florida Prime Associates, Inc. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3)ROLE b. (1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE C. 144 : I F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S ' QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 70 projects, if not specified. Complete one Section F for each project.) 0. EXAMPLE PROJECT KEY NUMBER 14 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED Sanitary Sewer Master Plan El Portal, Florida a. PROJECT OWNER Village of El Portal PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2017 2017 23.PROJECT OWNER'S INFORMATION b. POINT OF CONTACT c. POINT OF CONTACT TELEPHONE NUMBER Claudia V. Cubillos, Mayor (305)795 7880 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, sire, and cost} The Sanitary Sewer Master Plan is a comprehensive report to define priority areas and determined corrective actions required to convert from a decentralized wastewater treatment system (septic system) to a new sanitary sewer gravity collection system with lift stations. The Master Plan also included a comprehensive survey base map for the entire village, hydraulic sewer modeling and the overall design of eighteen phases of construction. The sanitary sewer systems were developed using best management practices, current levels of service, and to investigate various funding sources. Total cost for the project was $75,000. The estimated total costs of the village's sanitary sewer improvements were $23.84 Million. The project began in May 2016 and was completed in May 2017. 25 FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a.Craig A. Smith &Boca Raton, Florida Prime Associates, Inc. (1) FIRM NAME (2) FIRM LOCATION (City and State} (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State} (3) ROLE C. 179 F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TE AM'S ' QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 0. EXAMPLE PROJECT KEY NUMBER 15 21. TITLE AND LOCATION (City and State!22.YEAR CO MPLETED Stormwater Master Plan PROF ESSIONAL SERVICES CONSTRUCTION (If applicable! Spring Lake Improvement District, Sebring, Florida 2006 2008 23.PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT Joe DeCerbo c.POINT OF CONTACT TELEPHONE NUMBER Spring Lake Improvement District 24. BRIEF DESCRIP TION OF PROJECT ANO RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) (863)655 1715 The primary objective of the project was to develop a comprehensive Stormwater Master Plan for Spring Lake Improvement District. As part of the Master Plan, CAS prepared a Plan of Water Reclamation, modeled the conveyance system, identified system deficiencies, made recommendations for improvements and updated construction cost estimates for the proposed stormwater improvements. CAS filed and obtained a conceptual permit for improvements from SFWMD, prepared a USDA funding application (FDEP 319 Grant) and assisted in obtaining state legislative appropriation. SLID has begun acting on the Master Plan recommendations by implementing a 60-acre Stormwater Treatment Area. The total project cost was $266,316. The project began in October 2006 and was completed in August 2008. Stormwater Master Plan development, ICPR flood modeling, CIP development, aerial photogrammetry, treatment alternatives, cost estimates and analysis, permitting and grant and appropriation assistance. 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1)FIRM NAME (2) FIRM LOCATION (City and State} (3) ROLE a.Craig A Smith &Boca Raton, Florida Prime Associates, Inc. (1)FIRM NAME (2)FIRM LOCATION (City and State} (3) ROLE b. (1)FIRM NAME (2)FIRM LOCATION (City and State} (3) ROLE c. 88 G.KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 26.NAMES OF KEY 27.ROLE IN THIS 28. EXAMPLE PROJECTS PERSONNEL CONTRACT (Fill in "Example Projects Key" section below before completing table. Place (From Section E, (From Section E, "X" under pro·ect ke number for artici ation in same or similar role.) Block 12) Block 13) ,. : . I Stephen C. Smith, P.E. Cont ract Director / X X X X X X X X X X Project Manager Orlando A. Rubio, P.E. Project Mana ger / X X X X X Sr. Supervising Engineer Frank Vilar, P.E. Sr. Supervising X Engineer Greg Giarratana Sr. Super vising X X X Engineer Al Caruso, E.I. Project Engineer X X X X Keith Schriner Project Engineer X X Robert Keener, PSM Project Surveyor X X X X X X X X X X James Driscoll Director of SUE X X X X X X X Alan Lopez Locates Supervisor X Tony Gomes Sr. Field Rep X X X X X X X William Tanto Sr. Field Rep X X X X Michael Marenco CADD Manager X X X X X X X X X X 29.EXAMPLE PROJECTS KEY NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) City of Sunny Isles Beach Town of Pembroke Park 1 NE 174th Street Stormwater and Pavement 6 Sanitary Sewer Pump Station and Improvements Forcemain Improvements Town of Golden Beach City of Moore Haven 2 Capital Improvements Project Phase Ill & IV 7 Avenue R Stormwater Improvements Stormwater Collection System with Master Pump Stations City of Miami Beach City of Sweetwater 3 Palm & Hibiscus Island Stormwater & 8 Stormwater & Pump Stati on Roadway Improvements Improvements Phase IV Hardee County Wauchula Hills Town of Pembroke Park 4 Water and Sanitary Sewer Improvements Ph 9 SW 52 nd Avenue (North) Roadway and IV Drai nage Improvements 5 City of Margate 10 City of Pompano Beach Lift Station No. 22 Rehabili tation SW 2 nd Street Drainage Improvements I 26.NAMES OF KEY 27.ROLE IN THIS 28.EXAMPLE PROJECTS PERSONNEL CONTRACT (Fill in "Example Projects Key" section below before completing table. Place (From Section E, (From Section E, "X" under pro·ect ke number for partici ation in same or similar role.) Block 12) Block 13) . Stephen C. Smith, P.E. Contract Director / X X X X X Project Manager Orlando A. Rubio, P.E. Project Manager/ X X Sr. Supervising Engineer Frank Vilar, P.E. Sr. Supervising Engineer Greg Giarratana Sr. Supervising X X X X Engineer Al Caruso, E.I. Project Engineer X X Keith Schriner Project Engineer Robert Keener, PSM Project Surveyor X X X X James Driscoll Director of SUE X Alan Lopez Locates Supervisor Tony Gomes Sr. Field Rep X William Tanto Sr. Field Rep X X Michael Marenco GADD Manager X X X X 29.EXAMPLE PROJECTS KEY NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) 11 Miccosukee Tribe of Indians of Florida Water Distribution System Improvements 12 Spring Lake Improvement District Sto rmwater Pump Station Rehabilitati on Glades County 13 Avenue L, M, N & 4th Sani tary Sewer Improvements 14 Village of El Portal Sanitary Sewer Master Plan 15 Spring Lake Improvement District Stormwater Master Plan 33. NAME AND TITLE Stephen C. Smith, P.E., President/CEO H.ADDITIONAL INFORMATION ARCHITECT-ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (if any) RFQ 20-07-01 'PART II-GENERAL QUALIFICATIONS (Ha firm has branch oHices, complste for 1111ch B!!!!?_lfic branch office BHklng_JIJ'!!.rk.J. 2a. FIRM (OR BRANCH OFFICE) NAME 3. YEAR ESTABLISHED 4. DUNS NUMBER Craia A. Smith & Associates, Inc. 1980 03-86950292b. STREET 5. OWNERSHIP21045 Commercial Trail a. TYPE 2c. CITY 12d. STATE I 2e. ZIP CODE Corporation Boca Raton FL 33486 b. SMALL BUSINESS STATUS 6a. POINT OF CONTACT NAME ANO TITLE N/A Stephen C. Smith, P.E., President/CEO 7. NAME OF FIRM (If block 2a. is a branch office) N/A6b. TELEPHONE NUMBER , 6c. E-MAIL ADDRESS (561)314-4445 ssmith@craigasmith.com 8a. FORMER FIRM NAME(S) (If anv) 8b. YR ESTABLISHED 8c. DUNS NUMBER t 9.EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE RE VENUE FOR LAST 5 YEARSI c. No. of Employees c.Revenue a. Function a. Profile Index Code b. Discipline (1) FIRM (2) BRANCH Code b. Experience Number (see below) 02 Administrative 7 C10 Commercial Buildinas 1 08 CADD Technical 3 C11 Commercial Facilities 1 12 Civil Enaineerina 7 C16 Construction Survev 3 15 Construction lnsoection 3 D04 Desian Buildina 1 42 Mechanical Enaineer 1 D05 Diaital Elevation 1 38 Land Survevor 6 D08 Dredaina 1 Utilitv Locators 14 E09 Environmental lmoact Studies 1 G04 GIS 1 C15 Construction Manaaement 3 HO? Hiahwavs/Streets 2 106 Drainaae 4 L02 Land Survevina 4 001 Office Buildinas 1 P05 Plannina 2 RO? Remote Sensina 1 R09 Recvclina 1 R11 Waterwavs 1 S07 Solid Waste 1 S10 Survev 4 S13 Stormwater Handling & Facilities 4 Other Emolovees T04 T ODO Survev & Mannina 3 Total 41 W03 Water Supply 3 11.ANNUAL AVERAGE PROFESSIONAL PROFESSIONAL SERVICES REVENUE INDEX NUMBER SERVICES REVENUES OF FIRM 1. Less than $100,000 6.$2 million to less than $5 million FOR LAST 3 YEARS (Insert revenue index number shown at right) 2.$100,00 to less than $250,000 7.$5 million to less than $10 million a. Federal Work 1 3.$250,000 to less than $500,000 8. $10 million to less than $25 b.Non-Federal Work 7 4.$500,000 to less than $1 million million 5.$1 million to less than $2 million 9. $25 million to less than $50 c.Total Work 7 million 10.$50 million or greater '12. AUTHORIZED REPRESENTATIVEI., a. SIGNATUR�.;:-� I _vu,� c. N AME AND Ti LE - Ste�hen C. Smith, P.E.,�resident/CEO The foreaoina is a statement of facts. I b. DATE 8/11/2020 Craig A. Smith & Associates, Inc. 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 ARCHITECT -ENGINEER QUALIFICATIONS PART I-CONTRACT SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1 TITLE AND LOCATION (C,ty and State/ 2 PUBLIC NOTICE DATE 3 SOLICITATION OR PROJECT NUMBER B. ARCHITECT-ENGINEER POINT OF CONTACT 4. NAME AND TITLE Larry M. Smith, P.E./Presldent 5. NAME OF FIRM Smith Engineering Consultants, Inc. 6. TELEPHONE NUMBER (561) 616-3911 7. FAX NUMBER (561)616-3912 8. E-MAIL ADDRESS larry@smithengineeringconsultants.com C.PROPOSED TEAM (Comolete this.section for the orime contractor and all kev subcontractors.) (Check) �i 'I §l 9.FIRM NAME 10.ADDRESS 11.ROLE IN THIS CONTRACTm, 0.. vl I I Smith Engineering Consultants, Inc. 2161 Palm Beach Lakes Blvd., Suite 312 Electrical Engineering including West Palm Beach, FL 33409 Lighting Design a. X CHECK IF BRANCH OFFICE b. CHECK IF BRANCH OFFICE c. CHECK IF BRANCH OFFICE d. CHECK IF BRANCH OFFICE e. CHECK IF BRANCH OFFICE f. CHECK IF BRANCH OFFICE D. ORGANIZATIONAL CHART OF PROPOSED TEAM (Attached) AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 {6/2004) PAGE 1.1 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Comolete one Section E for each key oerson.) 12.NAME 13.ROLE IN THIS CONTRACTElectrical Engineer 14.YEARS EXPERIENCE Larry M. Smith, P.E.a.TOTAL 33 I b. WITH CURRENT FIRM20 15.FIRM NAME AND LOCATION (City and State) Smith Engineering Consultants, Inc, 2161 Palm Beach Lakes Blvd., Suite 312, West Palm Beach, FL 33409 16.EDUCATION (DEGREE AND SPECIALIZATION) Bachelor of Science in Electrical Engineering 17.CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Florida/Electrical Engineer ing 18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) b. d. e. Post-graduate studies at FAU in telecommunications, Tau Beta Pi (Engineering Honor Society), IEEE, Florida Engineering Society (PastPresident of the Palm Beach Chapter and State), Florida Building Code electrical technical advisory committee, FES state energy committee. ( 1) TIT LE AND LOCATION /City and State) ( 'it) ltf \\'l•:--t Palm lk·J�h Stri..·,.:1 l i�htill)-'. Wl·�t l',thll lk,11.:h. l"lornla - . . 19. RELEVANT PROJECTS .. . .. (2) YEAR COMPLETED PROFE SSIONA L SERVICES CONSTRUCTION r·• A;,;,hca t1!<) 20 1') 201') . . . .-.. . Designed the electrical systems, including new decorative lighting poles and fixtures, along Clematis Street in the 100 and 200 Blocks from Flagler Drive to Olive Avenue. The electrical systems included a new electrical service and power distribution for photoelectric controlled street lights, power pedestals and receptacles. Calculations for the roadway illumination were made in accordance with city requirements, and light pole details prepared for the selected decorative lighting. ( 1) TITLE AND LOCATION /City and St,,tei ( ·,1, of \\'1.''.'>I l\1!111 lh:;Kh �111.:1.:t I i1..:htme West Palm Beach. Florida . . • • . . .. (2) YEAR COMPLETED PR OFESSIONAL SERVICES CONSTl,UC TION ,,· ,t,,;: .. :.iblcJ201') 2021 . . -. . .-. Designed the electrical systems, including new decorative lighting poles and fixtures, along Tamarind Avenue from Banyan Blvd. to Palm Beach Lakes Blvd. The electrical systems included a new electrical service and power distribution for photoelectric controlled street lights. Calculations for the roadway illumination were made in accordance with city requirements, and light pole details prepared for the selected decorative lighting. ( 1) TITLE AND LOC ATION /City ""ti Sidle/ ( '1ly ,,f \\'1.·:-.1 l';1l111 lk-;ll.:h Stn:1:1 l.i,!-!li tin � West Palm Beach. Flonda BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION 1•1 A;,;•1c,1bic•I 2016 2017 ..-. -. . . Designed the electrical systems, including new decorative lighting poles and fixtures, for the Loftin Place development along North Dixie Highway between 6th St. and Eucalyptus St. The electrical systems included a new electrical service an d power distribution for photoelectric controlled street lights. Calculations for the roadway illumination were made in accordance with city requirements, an d light pole details prepared for the selected decorative lighting. ( 1) TITLE AND LOCATION /City an<! Sw,·) ( 'it, of \\'c:-.t Palm B •• :ad1 { ·urm: ParJ... l111pio,1.·1111.:11b West Palm Beach. Florida BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (2) YEAR COMPLETED PROF ESSIONAL SERVICES CONSTRUCTION i" A;�!,cJb!d 20 17 201') .. -.-.-. Designed the electrical systems, including new lighting poles and fixtures, for Currie Park along the lntracoastal Waterway. This additional lighting was installed to supplement the existing lighting throughout the park. LED type cobra head fixtures and aluminum poles were selected to match those existing throughout the park ( 1) TITLE AND LOCATION /City and State)C11y of\\'�sl P,:ilm lkad1 Str1,.•4,,:t l.i�htin� West Palm Beach, Flonda BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (!! A11 pt,c,1bl,') 2014 2016 .. -. -. -. Designed the electrical systems, including new decorative lighting poles and fixtures, for the sidewalks along Fem Street between Tamarind Avenue and South Olive Avenue. The electrical systems included a new electrical service and power distribution for photoelectric controlled street lights. Calculations for the roadway illumination were made in accordance with city requirements, and light pole details prepared for the selected decorative lighting. ae ----E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT IComolete one Section E for each kev oerson.J 12.NAME 13.ROLE IN THIS CONTRACT Electrical Engineer 14.YEARS EXPERIENCELuther E. Fair, P.E.a. TOTAL 40 I b. �ITH CURRENT FIRM 15.FIRM NAME AND LOCATION /Crtyand State/ Smith Engineering Consultants, Inc, 2161 Palm Beach Lakes Blvd., Suite 312 , West Palm Beach, FL 33409 16.EDUCATION (DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Bachelor of Science in Electrical Engineering Florida/Electrical Engineering 18.OTHER PROFESSIONAL QUALIFICATIONS /Publications, Organizations, Training, Awards, etc./ b. d. Post-graduate studies at FAU in telecommunications, Tau Beta Pi (Engineering Honor Society), IEEE, Florida Engineering Society (Past President of the Palm Beach Chapter and State), Florida Building Code electrical technical advisory committee, FES state energy committee, Designed the electrical systems, including new decorative lighting poles and fixtures, along Clematis Street in the 100 and 200 Blocks from Flagler Drive to Olive Avenue. The electrical systems included a new electrical service and power distribution for photoelectric controlled street lights, power pedestals and receptacles. Calculations for the roadway illumination were made in accordance with city requirements, and light pole details prepared for the selected decorative lighting. Designed the electrical systems, including new decorative lighting poles and fixtures, along Tamarind Avenue from Banyan Blvd. to Palm Beach Lakes Blvd, The electrical systems included a new electrical service and power distribution for photoelectric controlled street lights. Calculations for the roadway illumination were made in accordance with city requirements, and light pole details prepared for the selected decorative lighting, ( 1)TITLE AND LOCATION (C,ty ,1nd St.1tc) P(i:\ Bh d & ( ·1.:11t1al Bhd. l11h:r:--l'1,:t1 �,11 I i!,!hLnsPalm Beach Gardens. Flori da (2) YEAR COMPLETEDPROFESSIONAL SERVICES CONSTRUCTION (ti At •p!,cavtc) ::io1s 20.::!1> BRIEF DESCRIPTION (Brief scope, size, cost, ere.) AND SPECIFIC ROLE [X) Check if project performed with current firm SEC was a sub-consultant for lighting design for the proposed construction of an intersection widening project at PGA Boulevard and Central Blvd, in Palm Beach Gardens. We perfonned the intersection lighting analysis and photometric calculations for the intersection widening and to accommodate pedestrian crossings to recently updated standards, BRIEF DESCRIPTION /Brief scope, size, cost, etc./ AND SPECIFIC ROLE Designed the electrical systems, including new lighting poles and fixtures, for Currie Park along the lntracoastal Waterway, This additional lighting was installed to supplement the existing lighting throughout the park, LED type cobra head fixtures and aluminum poles were selected to match those existing throughout the park (1) TITLE AND LOCATION (City and State) . . . ' I • (2) YEAR COMPLETEDPROFESSIONAL SERV I CES CONSTRUCTION 111 A;,pt,cavte) .. .. -.-.-. F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, If not specified. C S Ffi h . . .20. EXAMPLE PROJECT KEY NUMBER I 21 TI TL E AND LOCATION (C11y and SI Jlc) 22 YEAR COMP LETED Cit) of\\ t:,t Palm [k.ich Ckm<tl h Strt:ch,apc lmp rm crnrnts PRO FESSIONA L SERVICES CONSTRUCTION (,f Appl icable) \\ ..:,t l'.!1111 lk ,1eh. rlorid,1 a. PROJECT OWNER City of West Palm Beach 2019 201') 23.PROJECT OWNER'S INFORMATION b. POINT OF CONT ACT NAME Tinu Pena c.POINT OF CONTACT TELEPHONE NUMBER 561-494-1051 24. BRIEF DESCRI PTION OF PROJECT AND RELEVANCE TO THIS CONTRACT {Include scope, size, and cost) Designed the electrical systems, including new decorative lighting poles and fixtures, along Clematis Street in the I 00 and 200 Blocks from Flagler Drive to Olive Avenue. The electrical systems included a new electrical service and power distribution for photoelectric controlled street lights, power pedestals and receptacles. Calculations for the roadway illumination were made in accordance with city requirements, and light pole details prepared for the selected decorative lighting. Total Project Cost = $16,400,000 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FI RM NAME (2) FIRM LOCATION(C,1yandS1a1c) (3) ROLE a. Smi th En gineer ing C(,nsultant,, \\'est Palm 13cach, 1'1(1rida Llcctrical Engin,:cring Inc. (1)FIRM NAME (2)FIRM LOCATION (City and State} (3) ROLE b. STANDARD FORM 330 (6/2004) PAGE 3.1 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATION S FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, If not specified. ' ' 20. EXAMPLE PROJECT KEY NUMBER 2 21 TI TLE AND LOCATION (C ,t, a•id Sta•c) 22 YEAR COMPLETED City of \\"c,t P,ilm lkadi ·1 ,un,irind A,..: Str..:<.:t Lighting PROFESSIONAL SERVICES CONSTRUCTION (1f Applicable) \\"..:,t Palm B..:ad1. rlorid,1 2019 2021 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER City of West Palm Beach b. POINT OF CONTACT NAME Tinu Pena c. POINT OF CONTACT TELEPHONE NUMBER 561-494-105124. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Smith Engineering Consultants, Inc. designed the electrical systems, including new decorative lighting poles and fixtures, along Tamarind Avenue from Banyan Blvd. to Palm Beach Lakes Blvd. The electrical systems included a new electrical service and power distribution for photoelectric controlled street lights. Calculations for the roadway illumination were made in accordance with city requirements, and light pole details prepared for the selected decorative lighting. Total Project Cost = $4,700,000 I. j4.::" ,j . --- I: ---�--.. .., -:�-1:1 I Ir·� t'"JtfA� .. t IL.ICTitlCALMEI' IQTU. {::....,_,,I•• l,1'U..J-"�·-·\.m..l (:'o:.,,,tt.•,1""1.:4t••]<,.-I (lr,GNf[RINGSEJMCe���1CI.D&ATlt$f_4TttRDQR•WPll,fl.U401•'1t(5&.1J4�•IU':$1)4t'-1111 -.. I g_ 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (C,tyand State) (3) ROLE a. Smith Engin..:..:ring Consult,rnts, W..:st Palm lkach, rlorida Ekctrical Lnginccring Inc. (1) FIRM NAME (2) FI RM LOCATION (City and State) (3) ROLE b. STANDARD FORM 330 (6/2004) PAGE 3.2 F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, If not specified. . . 20. EXAMPLE PROJECT KEY NUMBER 3 21 TITLE AND LOCATION (C,ty Jnd Sta'eJ 22 YE AR COMPLETED Loftin Pl,1cc Strccbc,1pc lmprm emcnh PROFESS IONAL SERVICES CONSTRUCTION (1f Applicable) \\ est l\1l111 Bc <1ch, rlorida , 2016 2017 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER City of West Palm Beach b. POINT OF CONTACT NAME Laura Le c. POINT OF CONTACT TELEPHONE NUMBER (561)822-130 0 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Designed the electrical systems, including new decorative lighting poles and fixtures, for the Loftin Place development along North Dixie Highway between 6th St. and Eucalyptus St. The electrical systems included a new electrical service and power distribution for photoelectric controlled street lights. Calculations for the roadway illumination were made in accordance with city requirements, and light pole details prepared for the selected decorative lighting. Total Project Cost = $479,000 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (C,tyand State) (3) ROLE a. Smith Engineering Consultants, W..:st Palm Beach, Florida Uectri.:al l:ngincering Inc. (1) FIRM NAME (2) FIRM LOCATION /City and State) (3) ROLE b. STANDARD FORM 330 (6/2004) PAGE 3.3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, If not specified. • • 20. EXAMPLE PROJECT KEY NUMBER 4 21 TITLE AND LOC ATION (C,ry a, d Star,) 22 YEAR COMPLETED f-ern Street Streetscape lmpnl\ cmcnts PROFESSIONAL SERVI CES CONSTRUCTION (,f Applica ble) West Palm Beach, Florida a. PROJECT OWNER City of West Palm Beach 2014 201(1 23. PROJECT OWNER'S INFORMATION b. PO INT OF CONTACT NAME Laura Le c. PO INT OF CONTACT TELEPHONE NUMBER (561)822-1300 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTR ACT (Include scope, size, and cost) Designed the electrical systems, including new decorative lighting poles and fixtures, for the sidewalks along Fern Street between Tamarind Avenue and South Olive Avenue. The electrical systems included a new electrical service and power distribution for photoelectric controlled street lights. Calculations for the roadway illumination were made in accordance with city requirements, and light pole details prepared for the selected decorativ e lighting. Total Project Cost = $634,000 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT ( 1) FIRM NAME (2) FIRM LOCATION (C,ty and Sr are) (3) ROLE a.Smith Engineering Consultants,West Palm Bc,1ch, Florida Llcctrical Engineering Inc. STANDARD FORM 330 (6/2004) PAGE 3.4 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, If not specified. . . 20. EXAMPLE PROJECT KEY NUMBER 5 21 TIT LE AND LOCATION (C,ty and State) 22 YEAR COMPLETED PGA Bh d. & (\:ntral Bild. Intersection Lighting PROFESSIONAL S ERVICES CONSTRUCTION (1f Applicable) P..ilm lk..ieh G.irden,, rlorida 1 _() 18 2020 a. PROJECT OWNER FOOT 23. PROJECT OWNER'S INFORMATION b. POINT OF CONTACT NAME Bob Lawson c. POINT OF CONTACT TELEPHONE NUMBER 5616977002 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) SEC was a sub-consultant for lighting design for the proposed construction of an intersection widening project at PGA Boulevard and Central Bl vd. in Palm Beach Gardens. We performed the intersection lighting analysis and photometric calculations for the intersection widening and to accommodate pedestrian crossings to recently updated standards. Total Project Cost = $859,000 1----- U�••c ·----------_!,_ 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (C,tyanaSta t,;) (3) ROLE a. Smith Engineering Consultants, \\'c�t Palm Be,1eh, l'lorida Elc<:trical Engineering Inc. (1) FIRM NAME (2) FIRM LOCATION /City and State) (3) ROLE b. STANDARD FORM 330 (612004) PAGE 3.5 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFIC ATIONS FOR THIS CONTRACT 20. EXAMPLE PROJECT KEY NUMBER (Present as many projects as requested by the agency, or 10 projects, If not specified. C t t S f Ffi h . t . . 6 21 TITLE AND LOCATION (C,ryand S1arc) 22 YEAR COMPLETED Jupiter Tandem Truck !\irking L0t lmpnn C.:lllCllh PROFESSIONAL SERVICES CONSTRUCTION (,f Applicable) Jupiter. r-lorida 2010 2011 23.PROJECT OWNER'S INFORMATION a. PROJECT OWNER Florida's Turnpike Enterprise b. POINT OF CONTACT NAME Jimmy Richie c. POINT OF CONTACT TELEPHONE NUMBER 561.472.8125 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) SEC was a sub-consultant for lighting design for the proposed improvements to the existing Tandem Truck Lot in Jupiter. We prepared a lighting design analysis report to evaluate the existing lighting installation, and to present our recommendations for modifications/add itions to the site lighting. We performed the site lighting design for the modifications/additions to the entry and parking areas of the existing tandem truck lot. Total Project Cost= $780,000 JT'Affl' Ol'FI.DIUDA OIJPAIIT/llli..._T OI' ffA�TA 710N �IIIIV•�•AL PRO.It.CT Q elf� I !;,l � Hta,,';r(K, .vrl1LR IAltDt.11 l�..J( 1CI 111•�-"'-•·· ··-:.:;_.z ... --:'-L_:;:f�:· -- ·-·-··· i -····-··-··· .i -.. .,,,."....(V..,�� r;:;•,-·= J =,-_ ! 4:!:� .. �:� =-� --� ___ , .... ,_,.,_., -... -.•· 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (C,ry and Sratc) (3) ROLE a. Smith Engineering Consultants, West Palm [kach, Florida Llectrical Engi neering Inc. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. STANDARD FORM 330 (612004) PAGE 3.6 U9 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, If not specified. C I I S t' Ffi h . t . . 20. EXAMPLE PROJECT KEY NUMBER 7 21 TITLE AND LOCATION (C•ty and S•a:c) 22 YEAR COMPLE TED SE 5th A\ cnuc Strcctscapc I PROFESSIONAL SERVICES C ONSTRUCTION (,f Applicable) Dclr<1v 13cach. fL 1 - l 200-l 2005 a. PROJECT OWNER City of Delray Beach 23. PROJECT OWNER'S INFORMATION b. POINT OF CONT ACT NAME Dave Frodsham c. POINT OF CONTACT TELEPHONE NUMBER 772. 781.3400 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Smith Engineering Consultants, Inc. designed the electrical systems, including new decorative lighting poles and fixtures, along SE 5th A venue. The electrical systems included a new electrical service and power for and photoelectric controlled street lights. Also included were tree lighting for specific landscape improvements, and power receptacles for holiday lighting of the trees. Calculations for the roadway illumination were made in accordance with city requirements, and light pole details prepared to match the existing decorative lighting to the east. Total Project Cost = $643,000 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (Cilya nd State) (3) ROLE a. Smith Engineering Consultants, \\'est l\1lm l3e<1ch, rlori<la I:lcctrical Enginee ring lnc. (1)FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. STANDARD FORM 330 (612004) PAGE 3.7 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TE AM'S QU ALIFICATIONS FOR THIS CO NTRACT (Present as many projects as requested by the agency, or 10 projects, If not specified. . . 20. EXAMPLE PROJECT KEY NUMBER 8 21 TITLE AND LOCATION (C,ty and State) 22 YEAR COMPLETED PG/\ Bh cJ.!SR 811 lnterd1angc and rl) cncr PROFESSIONAL S ERVICES CONSTRUCTION (1f Appl,cab le) Palm Bcac:h Garde,i-, f-lorida a. PROJECT OWNER FOOT i 200-1 2007 23. PROJECT OWNER'S INFORMATION b. POINT OF CONT ACT NAME Dana Gillettec. POINT OF CONTACT TELEPHONE NUMBER 561-753-972324. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) SEC developed the lighting design for the proposed construction of a SR 811 flyover bridge along PGA Blvd. in Palm Beach Gardens. The project also included the construction of new on-ramps to 1-95 and a loop road. We performed the lighting design for the installation of decorative light poles and fixtures across the PGA Blvd. bridge, and conventional light poles and fixtures throughout the rest of the project. Total Project Cost= $30,000,000 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (C,tyandState) (3) ROLE a.Smith Engineering Consultants,We,t Palm Beach, f-lorida Electrical [ngineering Inc.(1) FIRM NAME (2) FIRM LOCATION (C,tyand State) (3) ROLE b. STANDARD FORM 330 (6/2004) PAGE 3.8 F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 1 O projects, If not specified. . . 20. EXAMPLE PROJECT KEY NUMBER 9 21 TITLE AND LOCATION (C11yana Stale) 22 YEAR COMPLETED I-75 \\'ukni ng. Atlantic to Boynton , PROFESSIONAL SERV ICES CONSTRUCTION (1f Applicable) 13rtlll ard County, rtond,1 , 2016 2018 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER Florida's Turnpike Enterprise b. POINT OF CONTACT NAME Nisar Khan c. POINT OF CONTACT TELEPHONE NUMBER 561)753-9723 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT {Include scope, size, and cost) A widening project to widen the existing 6-lane freeway to 8 lanes. Conven tional roadway lighting design for the project in accordance with FDOT standards. Performed coordination with FPL for electric service, calculated voltage drop for lighting circuit conductors, and designed the lighting plans and electric service point details. Total Project Cost = $223,000,000 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (C11yand Stale) (3) ROLE a.Smith Eng ineering Consultanb,\Vest Palm Beach, Florida Electrical Engineering Inc. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. STANDARD FORM 330 (6/2004) PAGE 3.9 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, If not specified. C I S Ffi h . .20. EXAMPLE PROJECT KEY NUMBER 10 21 T I TLE AND LOCATION (C,ty and State) 22 YEAR COMPLETED SR A I A. Roadii ay Jmpnl\ cm..:nh PROFESSIONAL SERVICES CONSTRUCTION (,f Applicable) Boca Raton. r:lorida 2005 2006 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER City of Boca Raton b. POINT OF CONTACT NAME Dana Gillette c. POINT OF CONTACT TELEPHONE NUMBER 561)753-9723 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Pole-mounted roadway lights are known to discourage turtle nesting and cause disorientation for hatchlings. Smith Engineering's lighting designs incorporate alternative lighting design standards for environmentally sensitive coastal areas in Florida that are now used statewide by FDOT and others working in coastal regions. Many light fixtures are available with LED technology that provides color temperatures suitable for use in areas near the coastline. These help to minimize the impact of lighting on the sea turtles and their hatchlings. Total Project Cost = $3,900,000 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCA TION (C,tyand State) (3) ROLE a.Smith Engineering Consultants.West Palm Beach, r:lorida Electrical Engineering Inc. (1) FIRM NAME (2) FIRM LOCATION /City and State) (3) ROLE b. STANDARD FORM 330 (6/2004) PAGE 3.10 ARCHITECT -ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (ff any) PART 11-GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (OR BRANCH OFFICE) NAME Smith Engineering Consultants, Inc. 2b. STREET 2161 Palm Beach Lakes Blvd., Suite 312 2c. CITY West Palm Beach 2d. STATE FL 33409 a. TYPE Corporation 4. DUNS NUMBER 079572215 5. OWNERSHIP b. SMALL BUSINESS STATUS_____ ,......,.......,......,....,.,.,..,,,..,.,.,.,,..,=.,,...------.i...----.i...------""'11 City ofWPB, Palm Beach County, SFWMD, 6a. POINT OF CONTACT NAME AND TITLE FOOT Broward Count CBE Larry M. Smith, P.E., President 7. NAME OF FIRM (llbioci< 2aisabranchofficaJ 6b. TELEPHONE NUMBER (561) 616-3911 6c. E-MAIL ADDRESS larry@smithengineeringconsultants.com Sb. YR. ESTABLISHED Sc. DUNS NUMBER 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function b. DisciplineCode 02 Administrative 08 GADD Technician 21 Electrical Engineer 42 Mechanical Engineer 15 Construction Inspector Other Employees Total 11. ANNUAL AVERAGE PROFESSIONAL SERVICESREVENUES OF FIRM FOR LAST 3 YEARS /Insert revenue index number shown at right) a. Federal Won< b. Non-Federal Won<5 AUTHORIZED FOR LOCAL REPRODUCTION c. No. of Employees (1)FIRM (2)BRANCH 4 2 0 9 a. Profile Code A05 C18 003 E03 H04 L06 P07 P12 S13 A12 C04 B02 C08 C17 D04 F03 F05 S04 S07 H07 W03 R04 b. Experience Airports; Navaids; Airport Lighting Cost Estimating Desalinization Electrical Studies and Design Heating; Ventilating; Air Conditioning Lighting (Exteriors; Streets; Memorials; Plumbing & Piping Design Power Generation, Transmission, Dist. Storm Water Handling & Facilities Automation; Controls; Instrumentation Chemical Processing & Storage Bridges Codes; Standards; Ordinances Corrosion Control; Catholic Protection; Design-Build -Preparation of Requests for Fire Protection Forensic Engineering Sewage Collection, Treatment and Disposal Solid Wastes; Incineration; Landfill Highways; Streets; Airfield Paving; Parking Water Supply; Treatment and Distribution Recreation Facilities (Parks, Marinas, Etc.) c. Revenue Index Number (see below) PROFESSIONAL SERVICES REVENUE INDEX NUMBER 1. Less than $100,000 6.$2 million to less than $5 million 2.$100,000 to less than $250,000 7. $5 million to less than $10 million 3. $250,000 to less than $500,000 8.$10 million to less than $25 million 4.$500,000 to less than $1 million 9.$25 million to less than $50 million 5.$1 million to less than $2 million 10. $50 million or greater STANDARD FORM 330 (1/2004) PAGE 6 H.ADDITIONAL INFORMAITON 30.PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED .Smith Engineering Consultants, Inc. is a multi-discipline engineering firm with an in-depth knowledge of energy, water, telecommunications, and architectural projects. At SEC, we approach our business just as you do, focusing on our customers and the various environments in which they operate. SEC places a strong emphasis on creating productive working relationships with clients. Because we believe that teamwork is the key to success, our professionals are committed to responsive service, attention to detail, and effective communication and cooperation. Our staff has built a deserved reputation for completing assignments in a cost-effective and timely manner. We've accomplished this through innovative thinking, careful planning, and professionals who believe in quality and hard work. As Florida continues to experience tremendous growth, capital improvement projects will remain in the forefront of municipal infrastructure improvement efforts. The staff at Smith Engineering Consultants has played an important role in the design, construction, and renovation of facilities throughout the state. Our knowledge of facilities and agencies in the Tri-County area is particularly notable, due to our more than 30 years of experience here in south Florida. Public facilities require complex electrical and mechanical systems, including HY AC, plumbing, power, lighting, controls, instrumentation, and telemetry. You can tum to SEC for expertise in the design of these elements. Cost-effective design is the key to success for today's municipal infrastructure projects. Understanding that funding usually comes from a county or city's own tax base, our staff approach every design from a "Total Project" perspective. We will provide the most cost-effective and efficient design for the long term, always looking hard at the client's operation and maintenance costs. 31. SIGNATURE 33. NAME AND TITLELarry M. Smith, P.E./President I. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. 32. DATE 08-10-20 STANDARD FORM 330 (6/2004) PAGE 5 E. RESU'.\IES OF KE\' PERSO:\NEL PROPOSED FOR l IIIS CO;\TR.\CT (Complete one Sl'Clio n F. for cad, kc�· person.) 12. NAME 13. ROLE IN nns CONTRACT 14. YEARS EXPERIENCE Andrew Nixon, P.E. Senior Geotechnical Engineer a. TOTAL b. WITH CURRENT FIRM 15 5 IS. FIR,\.1 NAME AND LOCATION (Ciryand State) RADISE International, L.C., Riviera Beach, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) 117. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) B.S., Ocean Engineering, Florida Atlantic University, 2005 Professional Engineer, Florida No. 71458 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, A•urds, etc.) OSHA 40-hour Health and Safety / OSHA, 29 CFR 1919 .120 (HAZWOPER) Qualified Stormwater Management Inspector, Inspector# 27919 Florida Engineering Leadership Institute Alumni, 2015 Florida Engineering Society Member (FES), National Society of Professional Engineers Member (NSPE) &American Society of Civil Engineers a. b. c. d. e. 19.RELEVANT PROJECTS( I) TITLE AND LOCATION (City and State ) (2) YEAR COMPLETED City of West Palm Beach North Shore Drive Pedestrian Bridge,PROFESSIONAL SERVICES CONSTRUCTION (if applicable) Palm Beach County, Florida 2018 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 0 Check if project paformed wilh curren1 finn Senior Project Engineer -Provided geotechnical engineering services for the design of a pedestrian bridge on the west side of the existing vehicular bridge over the Carver Canal. The pedestrian bridge is clear span bridge (spanning approximately 114 feet). Foundation recommendations were provided for 14 and 18-inch Precast Prestressed Concrete (PPC) piles, and 14 and 18 inch Auger Cast-In-Place (ACIP) piles.(I) TITLE AND LOCA TJON (Ciry and State ) (2) YEAR COMPLETED FDOT Design Services for 1-95 at Boynton Beach Boulevard PROFESSIONAL SERVICES CONSTRUCTION (if applicable) Interchange, Palm Beach County, Florida 2018 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE O Check if project paformcd wilh current furn Senior Project Engineer-Provided geotechnical engineering services for the widening of Bridge #930289 over the SFRC/CSX Railroad, the widening of Bridge #930285 over I-95, and the retaining walls proposed for the widening of the bridge approaches and interchange access/egress ramps.(1) TITLE AND LOCATION (Ciryand State} (2) YEAR COMPLETED Prosperity Farms Road over SFWMD C-17 Canal Bridge PROFESSIONAL SERVICES Replacement, Palm Beach County, FL 2019-0ngoing (3) B.RIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 181 Check if project pafonned wilh current furn Principal Geotechnical Engineer. Identified the thickness and composition of the existing pavement section, estimated Structural Numbers for the existing pavement, provided detailed graphical logs of the borings showing the groundwater and soil classifications, identified structures of concern in order to develop the Vibration Monitoring Requirements, and developed milling and resurfacing recommendations. (I) TITLE AND LOCATION (Ciry and Slate} (2) YEAR COMPLETED Yamato Road from Lakeridge Boulevard to West of Florida's PROFESSIONAL SERVICES Turnpike Palm Beach County Florida 2018-2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 181 Check if project performed wilh current firm Senior Geotechnical Engineer. Provided a Geotechnical Engineering Services Report that identified the anticipated soil profile and the anticipated subsurface conditions within the depth of pavement wheel loading influence along the roadway; assessed the site preparation requirements and engineering criteria for placement and compaction of approved fill materials; and identified appropriate design and/or construction considerations based on the soil and groundwater conditions encountered in the borings.(1) TITLE AND LOCATION (Ciryand State) (2) YEAR COMPLETED Hood Road, East of Florida's Turnpike to W. of Central PROFESSIONAL SERVICES Boulevard and Hood Road & Central Boulevard Improvements, January 2018 -July 2019 Jupiter, Florida (3) BRIEF DESCRJPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 181 Check if project performed wilh current firm Principal Geotechnical Engineer. Performed field inspections, in situ compaction tests, sample collection and required Laboratory testing inclusive of material classification, in situ moisture content, organic content, gradational analysis and Atterberg limits performed on soil samples E. RESl/i\lES or KEY PERSONNEL PIWPOS[D roR TIIIS COl\TR.\CT (ComplNc one Section E for each kc� person.) 12. NAME 13. ROLE rN THIS CONTRACT 14. YEARS EXPERIENCE a. TOTAL b. WITH CURRENT FIRM Gregory J. Stelmack, P. E CEJ Lead/ Principal Geotechnical 28 6 Engineer 15. FIRM NAME AND LOCATION (City and Star,) RADISE International. LC, Riviera Beach, FL 16. EDUCATION (DEGREE AND SPECULIZ.ATJON) 17. CURRENT PROFESSIONAL REGISTRATION (ST ATE AND DISC/PU NE) BS in Civil Engineering -University of Wisconsin, Madison 1989 •Registered Professional Engineer, Florida #70556 (2009) •CTQP Drilled Shaft Inspection •CTQP Pile Driving Inspection 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organiz.ations. Training. AK<mis. ,ic.) Mr. Stelmack is a seasoned Project Manager skilled in providing construction materials testing and engineering inspection testing services including quality assurance/quality control for a wide variety of commercial, transportation, water resources, industrial, retail and institutional projects. He specializes in providing design recommendations for deep and shallow foundation systems for a variety of project types. He has worked on major projects throughout Florida and served as Project Manager and Senior Geotechnical Engineer on numerous projects for private and public clients including Cities, Counties, School Districts, FDOT, USACE and SFWMD. 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Palm Beach County Construction Materials Testing, Geotechnical PROFESSIONAL SERVICES CONSTRUCTION (if applicable) Engineering & Inspection Annual Services Contract, Palm Beach Ongoing County, FL a. Principal Geotechnical Engineer. Construction inspection and lab and field materials testing services including the demolition of existing Culverts and placement of new cast-in-place concrete culvert structures with gates and control systems and restoring the embankment, demolition of existing Culverts, the reconstruction of new structures and rehabilitation structure replacements. Also provided quality control services during concrete placement and casting of the building components. Services included a substantial role in inspection and oversight of earthwork tasks. (I) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Utility Special District Annual Consulting Engineer Inspection PROFESSIONAL SERVICES CONSTRUCTION (if applicable) Services, Riviera Beach, Palm Beach County, FL 2018 -Present b. (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE 181 Check if project performed with current finn CEI Administrator. Providing Construction Management and/or Inspection Services assisting in the implementation of its newly created Water/Wastewater Master Plan which defines the short-and long-range planning needs, operational and maintenance issues that impact the CRBUSD (I) TITLE AND LOCATION (City and Slate) (2) YEAR COMPLETED North Dade Optimist Park Community Recreation Center PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2014 Miami-Dade County, FL c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.} AND SPECIFIC ROLE 181 Check if project perfonned with current finn Project Manager and Engineer of Record. Provided Inspection and Testing Laboratory Services for the construction of a community recreation center facility. (I) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Water and Sanitary Sewer System improvements for Utility PROFESSIONAL SERVICES CONSTRUCTION (if applicable) Analysis Zones 110/111 and 113 (VAZ 110/111, VAZ 113A and 2017- Present VAZ 113B, City of Fort Lauderdale, FL d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.} AND SPECIFIC ROLE 181 Check if project perfonned with current fum CEI Administrator: Providing construction engineering inspector (CEI) for the attending pre-construction conferences, progress meetings and other project, Conducting on-site observations/verification of the construction in progress (including specialized field tests) to assist in determining if construction is proceeding in substantial accordance with the Contract Documents, Maintaining a set of "as-built" drawings with notes and annotations based on inspector's observations. E.RESlll\lES OF 1-:EY PERS0�1''EI, PROPOSED FOR THIS CO:\TR.\CT (Complrtr onr Srrtion E for rarh kr_,. prrson.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE a. TOTAL b. WITH CURRENT FIRM Akash Bissoon, P.E. Sr. Geotecbnical Engineer 14 s 15. FIRM NAME AND LOCATION (City and Stale) RADISE International, LC, Riviera Beach, FL 16. EDUCATION (DEGREE AND SPECIAL/l.ATION) 17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) B.S., Civil Engineering, Florida Atlantic University, Boca Raton,Professional Engineer, Florida No. 74582; CTQP Quality Florida Control Manager; CTQP Construction Engineering Inspector Level 2; Florida Department of Environmental Protection Qualified Storm Water Management Inspector, #16155 18. OTIIER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.} Mr. Bissoon's experience includes providing project management for FDOT projects and a wide range of work involving geotechnical, environmental and civil engineering. He is skilled in the preparation of specifications for roadway work, storm water management systems and water distribution systems. He is knowledgeable in current ASTM and AASHTO standards applicable materials testing and is skilled at conducting materials investigations through the construction completion-certification stage. He has served as a Senior Geotechnical Engineer on projects for clients including FDOT Broward County Aviation Department, SFWMD and USACE. I 9. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED North Dade Optimist Park Community Recreation Center PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2014 a. Miami-Dade County, FL (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE l!ll Oieck if project performed with current finn Geotechnical Engineer/Inspector. Provided Inspection and Testing Laboratory Services for the construction of a community recreation center facility. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FLL Site Prep and NA V AIDS Runway 9R-27L, Broward County, PROFESSIONAL SERVICES CONSTRUCTION (if applicable) FL 2014 b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE l!ll Oieck if project performed with current firm Senior Geotechnical Engineer. Construction Materials Testing Services including inspection and quality control. Performed soils testing for embankment, subgrade, base course and drainage components; concrete monitoring and testing; asphalt monitoring and testing; and vibration monitoring services. Estimated 140 days for sampling and field testing of the earthwork components. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Geotechnical Engineering & Materials Testing Continuing Services PROFESSIONAL SERVICES CONSTRUCTION (if applicable) Contract, FDOT D4/6, Palm Beach, Broward & Miami-Dade Ongoing Ongoing c. Counties, FL (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE l!ll Check if project performed with current fmn Senior Geotechnical Engineer. As Prime Consultant for this ongoing contract, the work includes providing districtwide materials field and lab testing services. (I) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Stormwater Treatment Area (STA) 1 West Expansion Area 2, Palm PROFESSIONAL SERVICES CONSTRUCTION (if applicable) Beach County, FL 2018 -2020 d. (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc.) AND SPECIFIC ROLE l!ll Oieck if project pcrfonned with current furn Senior Geotechnical Engineer. Geotechnical Engineering Services include an initial exploration of the subsurface conditions within the project area in order to provide preliminary geotechnical data and engineering information required to develop the design of the ST A. The scope of work included field exploration and sampling, well installation and permeability tests, laboratory tests and geotechnical data compilations. Craig A. Smith & Associates, Inc. SECTION E4 -WORKLOAD & STAFF AVAILABILITY PROJECTED WORKLOAD CLIENT PROJECT PERCENTAGE COMPLETE DESIGN CONSTRUCTION City of Belle Glade Torry Island Boardwalk, Seawall & Docks 100% 0% City of Belle Glade SCOP Resurfacing Projects -Funding 100% 10% Assistance Applications (13 streets) City of Delray Beach NW Neighborhood Improvements 15% 0% City of Lake Worth Beach Lake Osborne Estates Water Main 100% 25% Improvements City of Margate Station #7 Conversion 100% City of Margate Replace Existing WWTP Triplex Station 100% 0% & Dumping Station City of Margate Water Main Replacement & Upsizing in 100% 50% Residential Neighborhoods City of Oakland Park Cherry Creek 0% 0% City of Pompano Beach SW 2nd Street Drainage Improvements 100% 0% City of Pompano Beach Non Sewer Area C Engineering Design 100% Report City of Pompano Beach 14th St. & US 1 Drainage Improvements 30% 0% City of Pompano Beach Non Sewer Area C Sanitary Sewer 60% 0% Improvements City of Pompano Beach NW 16th Lane Drainage Improvements 5% 0% Florida Department of Statewide 3D Radar Tomography Support 30% Transportation Glades County Washington Park Sewer Improvements (LS 100% 0% &FM) Hardee County Wauchula Hills Phase 5.0 -Residential 100% 20% Sanitary Sewer Hardee County Wauchula Hills Phase 6.0 -Residential 100% 0% Water Main Extension Hazen & Sawyer Palm Beach East Central Regional 100% Treatment Plant Radar Scan & Survey Indian Trail Improvement Acreage Community Park 100% 90% District Indian Trail Improvement 1401h Avenue North Roadway 100% 0% District Improvements KO Construction of Florida, Titusville Boundary Survey 100% Inc. Kimley Horn & Associates Delray Beach Lowson Boulevard 95% Improvements (Survey) Mlccosukee Tribe of Indians Water Main Replacement 100% 0% of Florida Old Saybrook Golf Capitol Fairway Memorial Gardens Cemetery 90% (Survey) Spring Lake Improvement Stormwater Treatment Area Phase 2 -40% 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 � Craig A. Smith & Associates, Inc. SECTION E4 -WORKLOAD & STAFF AVAILABILITY Engineers • Surveyors • Subsurface Utility Engineering 30 Subsurface Imaging• Utility Coordination District Flow Diversion Weir Indian Trait Improvement 140th Avenue North Roadway District Improvements 100% 0% Indian Trait Improvement Acreage Community Park Expansion South 100% 65% District -Phase I Spring Lake Improvement Design & Build New WWTP 100% District Sunshine Water Control West Outfall Canal Widening 100% District Sunshine Water Control Coral Springs Drive Bridge Canal Widening 100% District Town of Pembroke Park Meekins Lake Stormwater Analysis 100% Town of Pembroke Park SW 25th Street Stormwater Improvements 100% Phase I Sun-N-Lake Improvement WTP Process Instrumentation and Controls 100% District (Sebring) Uoi!rades CURRENT MUNICIPAL CLIENTS (MULTI-YEAR CONTRACTS) City of Belle Glade (Since 2013) Hardee County (Since 1999) City of Lauderhill (Since 2013) City of Margate (Since 1988) City of Moore Haven (Since 1995) City of Sunny Isles Beach (Since 2013) City of Sweetwater (Since 2000) Glades County (Since 1993) Indian Trail Improvement District (2003-2007, 2014 to Date) 5% N/A 0% 0% 0% 0% CCPWA Utility Authority (Since 1994) Spring Lake Improvement District (Since 2001) Town of Golden Beach (Since 2000) Town of Pembroke Park (Since 1.987) Village of Biscayne Park (Since 2013) Village of El Portal (Since 2003) Sunshine Water Control District (Since 2015) City of Pompano Beach (Since 201.5) Sun "N" Lake Water Control District (Since 2017) City of Lake Worth (Since 2018) TEAM'S COMMITMENT & STAFF AVAILABILITY For the requirements of this contract, the CAS Management Team will assign responsibilities to survey crews, utility locating crews, staff engineers, subconsultants, construction management and supporting staff as needed for each assigned project. All staff members involved with an assigned project will be provided with the proper equipment and tools to perform the assign work. CAS is con fident that it maintains adequate staff and staff availability to perform the work assigned and is able to increase 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 Craig A. Smith & Associates, Inc. Engineers • Surveyors • Subsurface Utility Engineering 3D Subsurface Imaging • Utility Coordination SECTION E4 -WORKLOAD & STAFF AVAILABILITY staff as needed, due to its team experience, capacity and reputation in the industry. The CAS Team is ready to allocate the necessary staff and resources and to work with the City in accomplishing its goals as per contract requirements. We are committed to the City and will strive to continue to give excellent service in the survey, design and construction management services for assigned capital improvement projects on an as-needed basis. CAS STAFF AND KEY MEMBERS PROJECTED PERCENT AVAILABILITY FOR nus CONTRACT BASED ON CURRENT WORKLOAD Name of Staff Year 202�2022 Year 2023-2025 Stephen C. Smith, P.E. * 15% 15% William H. Landis, P.E. 30% 30% Frank VIiar, P.E. * 50% 50% Orlando Rubio, P.E. * 35% 35% Greg Glarratana* 40% 40% Keith Schriner* 35% 40% Al Caruso* 50% 55% Robert Keener, P.S.M.* 40% 50% Donald Drake 50% 50% David Lookabill 50% 50% James Driscoll* 30% 30% Alan Lonez* 30% 30% Mlchael Marenco* 30% 30% Miguel Rodrigues 40% 40% Michael LaVella 45% 55% Tony Gomes* 60% 60% WIiiiam Tanto* 50% 50% Michael Jones 15% 15% *Key Project Members 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 Craig A. Smith & Associates, Inc. SECTION E4 -WORKLOAD . & STAFF AVAILABILITY SUBCONSULTANT KEY STAFF MEMBERS PROJECT PERCENT AVAILABILITY FOR THIS CONTRACT BASED ON CURRENT WORKLOAD Name of Staff Year2020 Year 2021-2022 Marcus Unterweger, P.E. (MUEngtneers) 5% 5% Ricardo Madriz (MUEngtneers) 5% 5% Larry Smith, P.E. (Smith EnJ!lneerlng Consultants) 66% 75% Luther E. Fair, P.E. (Smith Engineering Consultants) 70% 80% Greeorv J. Stelmack, P.E. (Radlse International) 50% 50% Andrew Nixon, P.E. (Radlse International) 50% 50% Akash Blssoon, P.E. (Radlse International) 50% 50% Jose LoDez, P.E., PMP (Bermello AJamll & Partners) 60% 60% 21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110 Alexander Diaz Town Manager August 31, 2018 TOWN OF GOLDEN BEACH One Golden Beach Drive, Golden Beach, FL 33160 Office(305)932-0744 • Fax(305)933-3825 www.goldenbeach.us RE: LEITER OF RECOMMENDATION To Whom It May Concern: This letter is on behalf of Craig A. Smith & Associates (CAS). The Town of Golden Beach has been working with Craig A. Smith & Associates since 2000. Over the past 18 years, Craig A.Smith & Associates has provided surveying, engineering, construction management andutility locating services on various stormwater, utility and roadway improvement projects.CAS also serves the Town in the capacity of Town Engineer.For over the past 18 years, The Town of Golden Beach has found CAS to be extremely effective in accomplishing the scope of service which has been their responsibility on numerous projects. I therefore recommend them highly for work. Respectfully, Alexander Diaz Town Manager t)illage of Cl Portal AugU$t�7, 2018 soo Northeast 87th Street El Ponal, Florida 33 J3&,3S J 7 �lephone (305) 795-7880 FaX (305) 79S-7884- RE: LETTER OF RECOMMENPATION To Whom It May Concern, This letter is on behalf of Craig A. Smith & Associates (CAS). The Vllla1e has been worting with Cr-alg A. S,nlth & Associates since 2002. (;)¥er the past 15 years, Craig A. Smith & Associates has provided surveying, engineering, construction management and ut�lity ·1ocatin.1 services on various stormwater, utility and roadway improvement projects. CAS also serves the Village In the capacity of Village Engineer. For qver th� past 15 years The Village of El Portal has found CAS to be extremely-effective and efficient in .accomplishing the scope Qf service, which has been their responsibility oq numerous projects. Most of which these projects .ari? multifaceted, yet when wortir-s with CAS, they always have,infor-m1t:ion readily avaii.tite, explaln with ease to administration and co1,1ndl, all of which allows for;a. better understanding frGm us and allows us to reach timely declsions. A Municipal Corporation since September 11, 1945 110 Or. Martin Luther King, Jr. Boulevard West Belle Glade, FL 33430 Tel: 561-992-1601 Fax: 561-992-2221 www.beffegladegoy.mm Commissioners Steve B. Wilson Mayor Mary Ross Wilkerson Vice Mayor Michael C. Martin Treasurer Johnny Burroughs, Jr. Larry Underwood Lomax Harrelle Oty Manager City of Belle Glade Office of the City Manager March 1, 2019 RE: LETTER OF RECOMMENDATION To Whom It May Concern: This letter is on behalf of Craig A. Smith & Associates (CAS). The City of Belle Glade has been working with Craig A. Smith & Associates since 2013. Over the past 5 years, Craig A. Smith & Associates has provided surveying, engineering, construction management and utility locating services on various stormwater, utility and roadway improvement projects. CAS also currently serves the city in the cap acity of City Engineer. For over the past 5 years, the City of Belle Glade has found CAS to be extremely effective in accompli shing the scope of service which has been their responsibility on numerous projects. Most of these projects are multifaceted and complex, yet when working with CAS, they always have information readily available and explain with ease to City administration and our Commission, all of which allows for a better understanding from us and allows us to reach timely decisions. I therefore recommend them highly for work. Sincerely, oc�/� Harrelle August 14, 2013 Lake Sebring, Phone www.sprlnglakefl.com RE: LETTER OF RECOMMENDATION To Whom It May Concem, This letter is on behalf Craig A Smith Associates. Spring Lake Improvement District has been working with Craig A Smith Aaaociates since 2004. Over the past 9 years, Craig A. Smith & Associates has provided surveying, engineering, construction management and utility locate services on various projects involving stonnwater, and road Improvements. Craig A. Smith Associates also services the District In the capacity as District Engineer. For over 9 years, SLID has enjoyed a successful relationship with Craig A. Smith & Associates, and highly recommends Craig A. Smith & Associates for Engineering, Surveying and Utility Locate Services. If you have any questions please feel free to contact our office. Sincerely, Brian Acker Chairman, Board of Supervisors *KEY CAS STAFF ARE HIGHLIGHTED IN YELLOW*SUBCONSULTANTS ARE HIGHLIGHTED IN GREEN