HomeMy WebLinkAboutCraig A. Smith & AssociatesDue: August 18, 2020
Craig A. Smith & Associates, Inc.
SECTION 8-TABLE OF
CONTENTS
Description Section
Cover Letter and Executive Summary ............................................................................... C
Project Approach and Understanding................................................................................ D1
Innovative Technology ...................................................................................................... D2
Qualification Information and Assigned Personnel ............................................................ E1
Prime Consultant SF330 Forms ........................................................................................ E2
Subconsultant SF330 Forms............................................................................... E3
Workload & Staff Availability................................................................................ E4
Licenses and Letters of Recommendation......................................................................... E5
Financial Stability.......................................................................................... .. .. . E6
Prime Firm References and Similar Work Completed .. ... .. ........... ..... ....... .... .... ... .. .. ....... ... F1
Subconsultant Firm References and Similar Work Completed .. . . .. .. .. . . .. .. .. . .. .. .. .. .. . .. .. . .. . .. .. F2
Organizational Chart . . . . . . . . . . . .. . .. . . . . .. . .. . .. . .. . .. . .. . . . . . . . .. . .. . . . . . . . .. . . . . .. . .. . .. . . . . . . . .. ........ .... F3
Corporate Standing and Authorized Signatory .. .. .. .. .. .. .. .. .. . . . .. . .. .. .. .. .. .. . .. .. .. . .. . . . . . . . . . . .. .. .. .. .. G
Forms and Attachments . .. . . .. . . . . . . . .. . . .. .. . . . . . . . . . . . . . .. . . . .. . .. . .. . . . . . . . . . . . .. . . . . . . . .. . .. . . . . . .. .. .. . .. . . . .. .. . .. .. . H 1
Acknowledgement of Addenda .......................................................................................... H2
Certificates of Insurance.................................................................................................... H3
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
Craig A. Smith & Associates, Inc.
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
CRAIG A. SMITH & ASSOCIATES
21045 Commercial Trail • Boca Raton, FL 33486
CONSULTING ENGINEERS • SURVEYORS • VTIUTY LOCATORS
August 11, 2020
Mauricio Betancur, CMC City Clerk
City of Sunny Isles Governmental Center
18070 Collins Avenue, 4 th Floor
Sunny Isles Beach, FL 33160
RE: RFQ NO. 20-07-01
www.c ralga s mlth.com
CONTINUING CONTRACT FOR CIVIL ENGINEERING SERVICES FOR VARI OUS CITY PROJECTS
CAS PROPOSAL NO. 3998
Dear Selection Committee:
For your consideration, Craig A. Smith & Associates, Inc. (CAS) is pleased to submit this proposal in response to your
Request for Qualifications for the Continuing Professional Consulting Services (CCNA) RFQ 20-07-01 .
Executive Summary
CAS is a 40-year established Civil/Utility Engineering, Utility Locating, Surveying, and Construction Management firm
headquartered in Boca Raton, Palm Beach County, Florida with a branch office in both Broward County and Miami-Dade
County. CAS overall has 40+ dedicated staff members consisting of registered professional engineers, registered
professional surveyors, GIS specialists including technical CADD drafting personnel, certified field inspectors, utility
locators, as well as exceptional administrative, clerical and accounting personnel, to provide the City with the expertise
required to perform duties requested for engineering services, including survey, utility locates, design, engineering reports,
utility modelling, permitting, bidding assistance, construction management through project close-out, grant
preparation/administration and any other consulting engineering services as needed to assist the City in completing projects
under this multi-year contract. CAS understands the scope of work requested by the City and has extensive experience in
performing such duties. CAS is submitting proposal documents for the following categories as listed in the RFQ: 2. Civil
Engineers, 3. Electrical Engineers, 4. Surveyors & Mapping, 7. Geotechnical Services, 8. Structural Engineering
Services, 9. Environmental Engineering, and 10. Construction Engineering and Inspection (CEI) Services. CAS
specializes in serving South Florida municipal governments and understands the needs of coastal communities such as the
City of Sunny Isles Beach. We are a client-oriented firm and our emphasis is on providing exemplary service. CAS has
been providing professional engineering services for stormwater system and roadway improvements to the City
of Sunny Isles Beach since 2013 and commits to continue to provide our technical, professional and financial
resources to the city.
Understanding Scope of Work
CAS understands the proposed scope of work. The type of capital improvement projects/assignments under this contract
for the categories mentioned above include but are not limited to: general consultation, feasibility studies, engineering
reports, monitoring/mitigation, planning, design, permitting, bidding assistance, and construction adm inistration and
inspection services, on-site representation, roadway improvements, sidewalks, bridge reh abilitation/inspec tion, seawalls,
structural components of buildings, stormwater/drainage system, water distribution, wastewater conveyance and collection
system, lift/pump station rehabilitation, shoreline retreat prediction/mitigation, grant funding assistance/ad ministration and
other municipal facility services and improvements as specified in the RFQ. The CAS Team is experienced in the design
and rehabilitation of numerous similar utility and infrastructure projects in the City and the in Tri-County area at large. We
highly value the City of Sunny Isles Beach as a client and look forward to continuing to serve the City with the utmost quality,
cost effectiveness and expeditious service. The CAS Team's extensive knowledge and project experience will continue to
be a benefit the City of Sunny Isles Beach. Please refer to Section E1 -Qualification Information and Assigned
Personnel, Section E2 -Prime Consultant SF330 Forms, Section E3 -Subconsultant SF330 Forms, Section F1
Prime Firm References and Similar Work Completed and Section F2 -Subconsultant Firm References and Similar
Work Completed.
Firm's Current Workload
CAS is currently reaching completion on many projects and is available to accept new projects. Please refer to the project
list showing workload with percentage of completion in Section E4 -Workload and Staff Availabi lity. The CAS
Manage ment Team will assign responsibilities to survey crews, utility locating crews, staff engineers, sub consultants and
construction management and supporting staff as needed. All staff members involved in the project will be provided with
the proper, resources, equipment and tools to perform the assign work. CAS ensures that it maintains adequate staff to
95◄.782.8222 561.31◄.◄◄◄5
561.31 ◄.◄◄58
PHONE
FAX
561.31◄.◄◄53
561.314.◄◄59
305.9◄0.4661
City of Sunny Isles Beach August 11, 2020 Page 2 of 2
perform the work assigned and is able to increase staff as needed, due to its experience and reputation in the industry. The CAS TEAM is ready to allocate the necessa ry staff and resources and to work with the city in accomplishing its goals as per contract requirements.
General Approach & Methodology We provide long term relationship-based engineering services to our clients. Our philosophy is to continue to work with city staff to provide the best possible services and solutions to complete projects cost-effectively and within the city's budget and schedule. CAS provides a team approach while making the city's staff an integral part of that team. The assigned improvement projects will be developed in the most cost-effective manner to achieve successful satisfactory results. The CAS philosophy utilizes a phased approach towards assisting the city in problem solving and for implementation of a cost effective and timely project completion. Our general project approach incorporates four phases consisting of the following: PHASE I -PROJECT DEVELOPMENT & PLANNING, PHASE II -SURVEY & ENGINEERING DESIGN, PHASE Ill -FINAL ENGINEERING DESIGN & BIDDING, PHASE IV-CONSTRUCTION MANAGEMENT and PHASE V-TESTING ST ARTUP & PROJECT CLOSEOUT. These phases are defined in detail in Section D1 -Project Approach and Understandin g.
Continuity of Staff Our internal company culture has created an environment for staff to excel and experience satisfaction. CAS is proud to state that the current average employee tenure is over 12 years. The City of Sunny Isles Beach will have the advantage of knowing that our assigned staff will be there throughout the duration of this contract and beyond to offer continued knowledge as well as experience to serve the city's interests. Many key CAS staff have served the city in the past 7 years.
The CAS Team
Mr. Orlando Rubio, P.E. will be the Project Manager/Production Team Leader for the duration of the contract. He can be reached at (561) 314 4445 Ext. 203 or via email at orubio@craigasmith.com. In addition to our CAS staff, the following four (4)sub-consultants will provide the additional professional disciplines and support which will be necessary to fulfill the scopeof work for the applicable categories. The sub-consultants are as follows: Radise International, LLC. (certlffed SBE-M/WBEnrm with Palm Beach County, M/WBE State certffled Rorlda DOT DBE and South Rorlda Water Management District SBE) forgeotechnical, material testing and construction engineering and inspection (CEI) services, Smith Engineering
Consultants, Inc. ( certffled CBE nrm with Broward County) for electrical engineering services, Bermello Aiamil & Partners,
Inc. for environmental engineering and public outreach, and MUEngineers, Inc. (Certffled CSE nrm with Broward County)for structural engineering services. CAS is a full-service engineering firm and shall provide many major services "in-house"such as, overall project coordination, survey, utility locating, utility engineering design, cost estimating, permitting, biddingassistance, utility coordination, construction manag ement, and grant funding assistance, etc., thus allowing for a more costeffective and efficient streamlined engineering process for many assigned projects. The CAS Team is also knowledgeablein the latest state and local regulatory requirements related to sustainability, resiliency and sea-level rise affecting SouthFlorida coastal communities. In addition, CAS always strives to provide "value-added" services to clients such as ourproprietary 3D Radar Tomography scanning technology (Refer to Section D2 -Innovative Technology). The CAS Teamis composed of quality and experienced local South Florida firms, all retaining previous similar project experience in the TriCounty area.
Principal CAS Staff
Mr. Stephen Smith, P.E., President/CEO is the Principal of the firm and is authorized to make representations for the firm and therefore will serve as the Principle-In-Charge for the duration of the contract. Mr. Smith can be reached by telephone at (954) 815-4111 or via email at ssmith@craigasmith.com. He will ensure the necess ary resources are provided for the duration of the contract. CAS, if selected by the City, is willing to meet at any location and commits to meet budget
and schedule requirements for all assigned task orders on an as-needed basis. We believe we are the best firm to perform the advertised services because of our current and past experience with similar capital improvement projects in the City of Sunny Isles Beach and Tri-County area at large. We can provide comprehensive solutions due to our breadth
of expertise based on years of experience, talent and innovation. We retain personnel with experience and training, along with a proven track record, to perform on time and within budget. CAS would be honored to have the opportunity to continue to work with the City of Sunny Isles Beach and looks forward to favorable consideration.
Si��·� A
Ste�, P.E., PresidenUCEO
CONSULTING ENGINEERS • SURVEYORS • UTILITY LOCATORS • GRANT SPECIALISTS WW W .C RAIG ASMITH.CO M
Craig A. Smith & Associates, Inc.
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
Craig A. Smith & Associates, Inc.
Engineers • Surveyors • Subsurface Utility Engineering
30 Subsurface Imaging • Utility Coordination
SECTION D1 -PROJECT
APPROACH AND
UNDERSTANDING
GENERAL PROJECT APPROACH
CAS utilizes a phased approach towards assisting the City in problem solving and for implementation
of assigned projects. Our general project approach is as follows:
PHASE I -PROJECT DEVELOPMENT AND PLANNING
•Meeting with City Staff to develop the
project scope (for each work
authorization as assigned}
•Develop a fee proposal to match the
project scope as per established fee
schedule
•Finalize the scope and proceed with a
kickoff meeting with the City Staff
•Perform Pre-Design Field Condition
Assessment
•Develop Project Prioritization and
Phasing (as needed}
•Conduct Modeling/Feasibility Studies &
Reports (as needed)
•Provide Grant Funding
Assistance/Admin istration (as needed}
•Finalize Design Criteria
•Prepare preliminary (conceptual)
engineering design/plans
•Outline specifications
•Prepare preliminary construction cost
estimate
•Public Involvement/Community
Outreach (as needed)
CAS shall develop project scope, prioritize and phase design work for projects in a manner that will avoid
schedule conflicts and allow for an efficient flow of work. CAS believes a high level of consistent
communication will be essential in providing a successful completion of the assigned projects. Our
management team will maintain a high level of communication with continuous accessibility to CAS
staff and all other team members (sub-consultants). The CAS Team's goal is to seamlessly operate as
an extension to City staff to satisfactorily complete projects on time and on or under budget.
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmlth.com • LB3110
�: t:?th & Assoclat� Inc.
Engineers • Surveyors • Subsurface Utility Engineering
3D Subsurface Imaging• Utility Coordination
PHASE II -SURVEY & ENGINEERING DESIGN
•Survey site as needed
•Soil borings and testing as required
•Review existing record drawings, utility
atlases and evaluate field conditions
•Utility Locates utilizing available
technologies, such as, Vacuum Soft
Digs, EM Designation , 2-D GPR and use
of 3D Radar Scanning
•Utilize necessary Engineering design
methods
•Utility Coordination
(Cable/Telecommunication Companies,
FPL, Gas Companies, etc.)
•Establish all design requirements
SECTION D1 -PROJECT
APPROACH AND
UNDERSTANDING
•Establish all permitting requirements
•Prepare engineering (30%-60%
construction plans) project plans
•Quality control meetings with CAS staff
•Meet with City Staff to review project
design, schedule and budget
•Adjust preliminary project quantities and
estimated costs
•Approval and adjustments to
engineering project plans
•Quality Assurance Review with City
CAS' unified design process along with its unique utility locating capabilities allows for accurate design
deliverables at an accelerated schedule. (i.e., 60% design plan deliverables at traditional 30% design
phase). CAS' unified design process includes survey and utility locates which are services provided "in
house" by CAS thus, eliminating the need for subconsultants for the development of basemaps and
allowing for a streamlined efficient and more cost-effective design. Acquiring comprehensive and
accurate utility locates in order to develop complete basemaps will be critical to the successful
completion of most projects, eliminating design deficiencies.
PHASE Ill -FINAL ENGINEERING AND BIDDING
•Preparation of 90% design and final
(1.00%) construction plans
•Preparation of final specifications and
contract documents
•Quality Assurance Review with City
•Finalize cost estimate; Develop Bid
Tabulation (Schedule of Values)
•Meet with City Staff to review final
project design, schedule and budget
•Finalize permitting (DERM, HRS, MIAMI
DADE WATER & SEWER, MIAMI-DADE
PUBLIC WORKS, FDEP, FDOT, CITY
BUILDING DEPT., etc.)
•Advertise for bidding
•Provide plan adjustments and finalize
for bidding
•Bid project (typical 30 days); solicit
qualified bidders
•Prepare bid addendums and answer
contractor RFl's
•Assist City in receipt of bids
•Review bids and bidder qualifications
•Recommend award
•Assist City with contract management
)45 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
�: ti & Assocl&l8' Inc.
Engineers • Surveyors • Subsurface Utility Engineering
3D Subsurface Imaging • Utility Coordination
t•q-
-I I
·----1u;-
cu�
,,,:--!ior.-i::::= :±!,��-
I I I I I I I J.i.�J I I I ..,10 I ·--I I I I I I I I I I
---=,?',.., r---It•_,,. .:.;. _.,. I ' ,�--=:::i - --tr�_: -t--. S--PRO \/l :::= ��-= -a=,:,·, � -... -=-�"'.:: t-:-:,t �-:-.: -----. -------=�� -. :-::.1 ----(-••;-· 1---1---t-->------•--=-= l.£-:-�-�'"=-1------1--· :-=t---�--�
c-o:---... �
FOR CONSTRUC'TlON [-=:::ll�?-llc?�-½it�U .... :��gyp, U ��-IF-Eff �8
City of Sunny Isles: NE 17 4th Street Roadway & Drainage Improvements Project -Plan & Profile Construction Plan Sheet
A 90% Design Review meeting will be scheduled with City staff for final comments and revisions prior
to submitting to regulatory agencies for permitting. CAS has over 40 years of experience and
understanding of the regulations and statutes in South Florida and as they pertain to utility and
infrastructure projects in Miami-Dade County. Permitting Agency Coordination which includes
compliance with the necessary regulations and proper communication with agencies is an important
aspect of any project. Coordinating with permitting agencies during the early stages of the project to
identify any "permitting challenges" that may impact the schedule of the project is very important.
CAS's experience and relationships with local regulatory agencies combined with a proactive approach
will ensure each project is permitted in a timely manner. Coordination with pertinent regulatory
agencies for projects under this contract may include but not be limited to the Miami-Dade Water and
Sewer Department. DERM, HRS, Miami-Dade Publlc Works, Rorlda Department of Transportation
(FOOT) and the City of Sunny Isles Beach Bulldlng Department.
PHASE IV -CONSTRUCTION
•Mobilize and prepare site
•Prepare safety plan
•Project field stak�ut
•NPDES permits & MOT plans
•Shop drawing submittal and approval
•Begin construction
•Construction inspection and reporting
•Construction management and administration
•Public lnvolvement;Community
Outreach Coordination
•Adherence to contract/permitting
requirements
•Prepare & issue certificate for periodic
payment
•Final construction & restoration
•Final punch-list
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www_craigasmith.com • LB3110
�: ii�h & Associates, Inc.
Engineers • Surveyors • Subsurface Utility Engineering
3D Subsurface Imaging• Utility Coordination
SECTION D1 -PROJECT
APPROACH AND
UNDERSTANDING
CAS has a knowledgeable and experienced construction management team which is important for
keeping a construction project on schedule, realizing potential cost savings and minimizing
construction impacts. CAS has experienced staff to provide effective contract administration including
cost estimating, schedule review, shop-drawing submittal review, processing of change orders and any
other related construction management activities. CAS will ensure key construction project elements
are documented and updated regularly and that any issues are addressed efficiently. CAS will ensure
that the contractor is held accountable, abiding according to design documents and meeting all
contractual obligations. Construction progress reporting, to the City of Sunny Isles Beach, will include
summary of work completed, critical issues requiring resolution in order to maintain project schedule,
planned budget versus actual cost to-date, planned work schedule for the next month and
identification of any upcoming conflicts or other critical items requiring tracking and updating.
PHASE V -TESTING, START-UP AND PROJECT CLOSEOUT
•Pressure tests, bacteriological sampling & clearance, sewer lamping and material
inspections
•Lift & pump station operational testing/trouble shooting
•Review record drawings
•Prepare Project Startup
•Prepare final accounting, certifications and close out reports
•Project Close-Out
QUALITY ASSURANCE/QUALITY CONTROL
Quality control throughout the Project Duration is handled by means of a check and balance system
and through the team's client relationships we form during the project providing continuous open,
often face-to-face and honest lines of communication. CAS conducts weekly QA/QC meetings in-house
every Monday to ensure the projects are on schedule and within budget. The CAS process will be
methodical and timely in approach. The established goals identified in the project initiation will be
implemented throughout the design, construction and close-out phase of each project.
Members of the CAS Project Team will meet regularly to establish consistent quality review
framework.
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
� Craig A. Smith & Associates, Inc.
Engineers • Surveyors • Subsurface Utility Engineering
30 Subsurface Imaging• Utility Coordination
SECTION D1 -PROJECT •
APPROACH AND
UNDERSTANDING
•Quality Standards are fundamental to the success of the project. CAS prides itself on the
consistent high quality of our output, whether it is project plans, specifications, design
elements, comprehensive studies, survey, utility locates or grant writing.
•At CAS we are committed to achieving and maintaining the highest quality standards possible
and ensuring the client's satisfaction. Refer to the CAS Design Process Flow Chart at the end
of this section as an example of the typical QA/QC process implemented for projects.
ABILITY TO MEET PROJECT SCHEDULES
CAS prides itself on our ability to tallor our services to meet our clients' needs. We are proud of our
past history of successful design projects. This success is a result of our highly experienced staff
members who have created a cohesive team ensuring projects are completed in a timely and cost
effective manner. CAS is dedicated to execute assigned project schedules established at the
beginning of each project. The CAS Team shall include a pre-design conference to establish the
project contact with the City, regulating agency and CAS. From this meeting a detailed project
schedule will be established. Design and Construction team progress updates will be provided on a
monthly basis. Weekly project progress reports will be provided to the City upon request and to all
involved with the project. Otherwise status of each milestone identified at the initial project "kick-off"
meeting will be updated on a regular monthly basis along with any updates to the project schedule.
The CAS process will be a methodical and timely approach. CAS will assist in implementing goals
established in each project scope during the design and construction phase of each project. Many
slmllar projects for other munlclpalltles that CAS provides engineering services for are grant funded
and therefore have establlshed deadllnes that MUST be met In order to secure funding. CAS staff are
well accustomed to working and completlng projects within strict deadlines.
PROJECT MONITORING & BUDGETING
In order to get the most accurate budget price at the pre-construction phase and the construction
phase, the CAS Team details all design items into many small parts that will add up to one whole part
(Bill of Materials or Schedule of Values). By doing this our cost estimates are very accurate. Our track
record with cost estimates to bids has usually been within 5-10%. The CAS Team' philosophy utilizes
this phased approach towards assisting the City in problem solving and for implementation of public
works and planning projects. "Schedule, Cost Control and Team Work• -The CAS Team approach is to
develop milestones and defined deliverables with the City in order to meet the City's requirements. We
will identify potential issues early in the project so necessary action can be taken to keep the project on
schedule.
The CAS Team will provide the City of Sunny Isles Beach with the design and construction schedule
for review and approval prior to commencement, including critical path items. CAS will review the
project schedule with the City staff on a weekly or monthly basis and verify that it is consistent with
the requirements of the contract for design, bidding and construction. Any changes to the schedule
milestones or deadlines shall be approved by the City of Sunny Isles Beach. CAS will advise the City
of any areas where the schedule is not in compliance with the contract.
We will continually update the cost of each project (as needed) in order to stay on budget. If an issue
develops with the schedule, cost or the budget, we advise the City and develop a plan for corrective
measures with the staff. We consider the City and The CAS Team as one team, all striving for the same
goal of a quality product on schedule and on or below budget. The CAS Team Te chnical Reviews shall be
21045 Commercia l Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
� Craig A. Smith & Associates, Inc.
Engineers • Surveyors • Subsurface Utility Engineering
30 Subsurface Imaging• Utility Coordination
SECTION D1 -PROJECT
APPROACH AND
UNDERSTANDING
conducted throughout the project schedule by the principal and project managers of our firm as part of
our commitment to qualit yengineering.
The CAS Team will prepare an opinion of probable construction cost in accordance with the
American Association of Cost Engineering (AACE) at the following stages of each assigned project (as
needed):
•30% schematic design
•60% design development
•90% design development
•100% construction documents
Cost estimates will be prepared for guidance in project evaluation and implementation from the
information available at the time the estimate is developed. The final costs of each project will
depend on actual labor and material cost, competitive market conditions, final project scope,
implementation schedule, and other variable conditions.
INNOVATIVE TECHNOLOGY -THE CAS ADVANTAGE
The CAS Team's experienced engineering staff, in-house survey and extensive utility locating
capabilities allows for the development of very accurate and complete basemaps for design of capital
improvement projects. There is no second guessing as to the location of existing buried utilities (both
active and abandoned), therefore greatly reducing or altogether eliminating change orders. This Is the
•CAS ADVANTAGE". Our goal Is to have no change orders. Refer to Section 02 -Innovative
Technology for further information.
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
Craig A. Smith & Associates
CIVIL ENGINEERS I SURVEYORS I UTILITY LOCATORS
TOPOGRAPHIC/
BOUNDARY SURVEY
**
** 3 DAYS OR LESS TURN-AROUND TIME (TYPICALLY)
100%
BASE
MAPS
60%
DESIGN
DESIGN PROCESS FLOW CHART
RECORDS
RESEARCH
SUNSHINE
ONE CALL
PERMITS
PREP/SUBMIT
2-D EMO
UTILITY
LOCATES
2-D PR
90%
DESIGN
POTHOLES /
SOFT DIGS
**
3-D RT
100%
DESIGN
Craig A. Smith & Associates, Inc.
Engineers• Surveyors • Subsurface Utility Engineering
30 Subsurface Imaging • Utility Coordination
CADD
FINAL
CONSTRUCTION
PLANS
TO
CONSTRUCTION
SECTION D1 - PROJECT APPROACH & UNDERSTANDING
Craig A. Smith & Associates, Inc.
Craig A. Smith & Associates, Inc.
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
Craig A. Smith & Associates, Inc.
Engineers • Surveyors • Subsurface Utility Engineering
SECTION D2 -INNOVATIVE
TECHNOLOGY
SUBSURFACE UTILITY ENGINEERING (SUE) -3-0 RADAR TOMOGRAPHY
utlllty
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
� Craig A. Smith & Associates, Inc.
SECTION D2 -INNOVATIVE.
TECHNOLOGY
Engineers • Surveyors • Subsurface Utility Engineering
The •CAS Advantage• -Benefits of a Unified Design Process and the Use of 3-D Radar
Tomography
CAS has the unique capability of providing clients with survey and advanced utility locates for utility
design projects. CAS' highly experienced survey crews and utility locating staff with the use of all the
latest technology, coordinate closely with project engineers and collect field data with engineering
principles and guidelines in mind. The fact that CAS provides such a unified process to design allows for
fast tracking of design projects.
CAS' unique capability in providing 3-D Radar Tomography scanning provides continuous x,y,z positioning
of buried utilities with great accuracy (+/-2inches horizontally and +/-6 inches vertically) along with the
associated topographic profile (ground surface elevations). The 3-D Radar Tomography unit is equipped
with an array of 17 antennas that "cross communicate" thus allowing for the level of accuracy stated
above. Generally, utilities to a buried depth of up to 15 feet can be identified by this technology and all
pipe material type can be located, including bends/fittings and offsets. Also, abandoned facilities and
non-utility anomalies can be identified that could potentially interfere with design elements. The use of
this technology can be especially beneficial for aged utility areas where record drawings are poor or non
existent. The implementation of 3-D Radar Tomography (3-D RT) to water main relocation projects as
proposed under this contract offers a practical solution to this critical issue. This allows for the
generation of very accurate and complete base maps which, in turn, acce lerates the design process
delivering 60% design plans at a typical 30% design plan submittal. In addition, this translates to superior
final construction plans, greatly reducing the potential for changes orders and delays during construction
due to unforeseen conflicts. Each 3-D RT unit scans a 6-foot wide pass. Under ideal conditions
(unobstructed clear areas), 5 acres per day can be scanned with a single 3-D Radar Tomography scanning
unit. The use of 3-D RT can reduce the need of vacuum excavation by 90% for locating subsurface
utilities, thus reducing surface impacts and restoration. 3-D RT is very cost competitive when compared
to traditional SUE methods due to the speed of data acquisition, accuracy and processing time.
_,. ,.... ,. ·· .--30 Rendering of lhe layers
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
Craig A. Smith & Associates, Inc.
SECTION D2 -INNOVATIVE
TECHNOLOGY
Diagram 1
Diagram 2
21045 Com mercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
SECTION D2 -INNOVATIVE.
Craig A. Smith & Associates, Inc. TECHNOLOGY
Engineers • Surveyors • Subsurface Utility Engineering
Once the data is processed and downloaded in Autodesk Civil 3-D, a 3-D model of the subsurface
conditions can be generated along with the traditional plan and profile drawings as base maps for design.
I. II
Typical 3-D Model Deliverable of Subsurface Utllltles
]( CAXld X. iUHR i XstoclJ.ffS ][�"-···s-�--� ...,.o, 8PEOF,C PUA POSE
8URVEY
a.W.lltAWH.111 P\.,lNM«,t'ltOf"ll..E(llllatn'SDl!I "" a)t;),,60 -3)1'•14
Typical Civil 3-D CADD Plan & Profile Deliverable
TOMOC-BAPH'! COLOR UPEND
c.:,; . .;: =>11f'.22j I 1�1'ts J e
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
Craig A. Smith & Associates, Inc.
Engineers • Surveyors • Subsurface Utility Engineering
SECTION D2 -INNOVATIVE
TECHNOLOGY
3-0 Radar Tomography -Limiting Factors
3-D RT is generally very successful in scanning through sandy soils, gravel, limestone, granite, asphalt,
concrete and shale, but readings can be inhibited by dense organic soil material such as muck, clay or
peat. Also, flowable fill may limit the radar's penetrating ability. In addition, narrow corridors (less than 6
feet wide) with numerous above ground obstructions such as utility poles, cable boxes, bollards, or FPL
transformers may limit the 3-D RT unit's accessibility. The use of 2-D GPR may be preferred in such
restricted areas.
Subsurface Utlllty Engineering Services for Clients
Our current and past clients for subsurface utility engineering services include federal, state, county, city
government facilities; U.S. Naval facilities; NASA Facilities; Port Authorities; design engineers and
contractors.
CAS maintains unlimited qualification with FOOT in categories 3.1, 7.1, 8.1 & 8.2. CAS is also licensed by
the State of Florida Department of Business and Professional Regulation Board of Surveyors as an
Engineering Survey firm, Land Bureau number 03110 (LB 03110).
CAS performs subsurface utility engineering & coordination services for numerous municipal clients and
is licensed and capable of performing proprietary and patented 30 Radar Tomography services
throughout the United States.
CAS performs comprehensive subsurface utility engineering for many municipalities on a contractual
basis, serving as the municipalities' One Call respondent. In this capacity, CAS staff members perform
hundreds of utility line designations every week. CAS also performs 2D Ground Penetrating Radar locates
and vacuum excavations for our municipal and private clients. In addition to providing One Call locates,
CAS serves as the municipalities' or clients' "clearing house" for design related utility services providing
plan mark-up, level D through A utility marking services, and coordination response in accordance with
Utility Accommodation Manual requirements.
CAS is currently providing utility locating services for the following:
•City of Hollywood . City of West Palm Beach •City of Coconut Creek . Town of Jupiter •City of Lauderhill . FPL . Town of Pembroke Park . FOOT . Town of Davie . Marathon OIi Corp. . City of Pembroke Pines . Citgo Petroleum . City of Weston . Port Everglades
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
� Craig A. Smith & Associates, Inc.
Engineers • Surveyors • Subsurface Utility Engineering
SECTION D2 -INNOVATIVE
TECHNOLOGY
Additionally, in the past CAS has performed various locating services for the foll owing:
•Town of Golden Beach
•City of Sweetwater
•City of Tampa
•City of Aventura
•City of North Miami Beach
•City of North Miami
•City of Cooper City
•Broward County
Pasco County
•Miami-Dade County
•Palm Beach County
•Sarasota County
•Colller County
•NASA Kennedy Space Center
•Hardee County
•AT&T/ BellSouth
• us Mllltary Facllltles
•City of Miami Gardens
•VIiiage of Bal Harbour
•US Navy, NAS Key West
•TECO Peoples Gas
•Tampa Electrlc
•Martin County
•Colonlal Plpellne
•Marathon Plpellne
•Valero Energy
•Armada Hess
•Motive (Shell) Enterprises
•Port of Tampa
•Port of Jacksonville
•Koch Plpellne
•Buckeye Partners
•Progress Energy
•Orange County
•JEA•us Park Service
•Central lntelllgence Agency
US Air Force
•USArmy
Balfour Beatty/ Parsons Brinkerhoff
CAS performs all utility related surveys in accordance with Minimum Technical Standards for Surveying &
Mapping, ASCE 38/02. All survey work is performed under the direct supervision of a licensed
professional surveyor.
CAS is fully compliant with major CADD software platforms (AutoCAD Civil 3D & AutoDesk Civil Design).
Quallty Assurance / Quallty Control -CAS maintains a comprehensive Quality Control and Assurance
program including, independent reviews by principal members of the firm. The principals maintain a
vested financial interest in the operation of the firm and output of quality deliverables. CAS performs
quality reviews through each phase of the project, up and through to deliverables. Quality reviews are
performed at the staff, project engineer, project manager and principal levels. Records of all deficiencies
found are noted and recorded. Corrections to deficiencies are checked against previously noted items
and confirmed for correction and compliance. This process is repeated through each project phase,
through final delivery.
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
Craig A. Smith & Associates, Inc.
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314--4445 • www.craigasmith.com • LB3110
� Craig A. Smith & Associates, Inc.
Engineers • Surveyors • Subsurface Utility Engineering
3D Subsurface Imaging • Utility Coordination
SECTION E1 -QUALIFICATION
INFORMATION AND ASSIGNED
PERSONNEL
FIRM OVERVIEW
Craig A. Smith and Associates, Inc. (CAS) is a Florida Corporation licensed for the practice of
Professional Engineering, Surveying, Utility Locates Services and Construction Management. CAS is a
local South Florida firm with corporate headquarters located in Boca Raton and branch offices in
Miami-Dade and Broward County.
Broward Office:
277 Goolsby Blvd. Unit 4C
Deerfield Beach, FL 33442
(954)782 8222
OFFICE LOCATIONS
Palm Beach Office:
Corporate Headquarters
21045 Commercial Trail
Boca Raton, FL 33486
(561)314 4445
Miami-Dade Office:
815 NW 57th Avenue, Suite 200-1<
Miami, Florida 33126
(305)940-4661
CAS was established In 1980. Since then, the firm expanded from its original, technical orientation in
municipal engineering and surveying into a full service civil engineering practice with specialized
expertise in engineering, surveying & mapping, grants/loan assistance, construction management, utility
locates and CAD design & development.
FIRM SIZE -CAS's professional, technical and administrative personnel numbering 40+ people
represent professionals in the fields of civil engineering, water and wastewater engineering, storm water
engineering, surveying, mechanical engineering, construction engineering, grant speciali sts, utility
locating, computer sciences, and finance. More specifically, CAS staff members consists of experienced
registered professional engineers, professional surveyors, certified CADD technicians, GIS specialists,
certified field inspectors, utility locators as well as competent administ rative, clerical and accounting
personnel, to provide you with the expertise required to perform the duties requested under this
contract.
ORGANIZATION -CAS is organized into five technical operating divisions each under the supervision of a
Vice President or Director. These operating divisions are:
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561.-314-4445 • www.craigasmith.com • LB31.10
� Craig A. Smith & Associates, Inc.
Engineers • Surveyors • Subsurface Utility Engineering
3D Subsurface Imaging • Utility Coordination
•Clvll Engineering
•CADD (Computer -Aided Design & Drafting)
•Construction Management
SECTION E1 -QUALIFICATION
INFORMATION AND ASSIGNED
PERSONNEL
•Surveying
•Subsurface Utlllty Locates
NUMBER OF EMPLOYEES AT EACH OFFICE LOCATION
PALM BEACH OFFICE
CADD Technical 3
Civil Engineering 8
Construction Inspection 3
Land Surveyors 4
Utility Locators 4
Administration 7
BROWARD OFFICE
Land Surveyors 2
Utility Locators 8
MIAMI-OADE OFFICE
Land Surveyors 1
Utility Locators 2
ARM PHILOSOPHY & EXPERIENCE -CAS is committed to providing its clients with cost-effective, timely,
comprehensive, high-quality professional services in the practice of civil engineering, surveying,
construction management, utility locating and granVlegislative services. This commitment to excellence
is achieved through the development of a team spirit of service to clients. CAS is a full-service civil
engineering firm and has extensive local South Florida experience in engineering design and
construction management of utility and infrastructure projects spanning over 40 years.
CAPABILITIES & CLIENT SERVICES
Craig A. Smith & Associates (CAS) is a local South Florida client-oriented firm tailored to serving the
needs of many governmental clients. We currently serve numerous other municipalities (counties,
cities, towns, special districts and utility departments/authorities) with similar services. CAS is highly
experienced and qualified to perform consulting services with respect to Civil Engineering -specifically,
utility (water & wastewater) engineering drainage/roadway design, master/project planning,
surveying, permitting, bidding assistance, construction management, Subsurface Utility Engineering
(Utility Locates), and grant funding assistance, more specifically for the following categories as
described in the Scope of Services of this RFQ: 2. Clvll Engineers, 4. Surveyors and Mapping, and 10.
Construction Engineering and Inspection (CEI) Services. Additional categories and services described
in the RFQ, such as 3. Electrlcal Engineers, 7. Geotechnlcal Services, 8. Structural Engineering Services
and 9. Environmental Engineering will be provided by qualified subconsultants that will comprise the
CASTeam.
Our success can be exhibited by our tenure with our clients, many of which we have served for over 20
years. We put premium value on the opinions and input of the end users of our services, officials, staff
and residents and strive to produce an end product that addresses their needs and expectati ons. CAS
is committed to making clients successful by understanding their organization, methods of operation,
challenges and achieving their objectives through a multi-discipline approach based on experience,
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
Craig A. Smith & Associates, Inc.
SECTION E1 -QUALIFICATION
INFORMATION AND ASSIGNED
PERSONNEL
CLIENTS
CCPWA
CIVIL ENGINEERING
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
� Craig A. Smith & Associates, Inc.
Engineers • Surveyors • Subsurface Utility Engineering
3D Subsurface Imaging • Utility Coordination
•Storm Water Management
•Storm Water Utilities
•Water Treatment & Distribution Systems
•Wastewater Collection/Transmission &
Treatment
•Potable Water Treatment Systems
•Wastewater Pump Station Design
•Stormwater Pump Station Design
•Canal Dredging and Sediment Removal
•Surface Water Management
•Utility Permitting
•Water/Wastewater Treatment Plant
Design/Rehabilitation
•Utility Pipeline Design & Relocation
(Water, Wastewater & Reclaimed Water)
•Utility Master Planning
•Grant Funding Assistance
SECTION E1 -QUALIFICATION
INFORMATION AND ASSIGNED
PERSONNEL
•Facility Planning
•Solid Waste Studies
•Solid Waste Disposal and Leachate Treatment
•Development Permitting
•Feasibility Studies
•Inflow & Infiltration Studies
•Construction Cost Estimate
•Construction Management
•Construction Observation and Certification
•Contract Administration
•Effluent Reuse & Disposal
•Sludge Treatment & Disposal
•Roadway & Drainage Design
I
I "' ' �-:-�
.::;•· •,.'( ---,:�
.,..
_.._,,... I ;_ ,"" I
�-----•-•-•••• SE!: SH££T C-12 FOR CONTINUATION I
FOR CONSTRUCTION d.n ... ttmt "OIJ.fflA'tMPflOVtM£KTS � . .,,., I c::=::.:;.-:;;;-:;:;:: 1 8 ( f.t\"r't'a ) C-10
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
� Craig A. Smith & Associates, Inc.
Engineers • Surveyors • Subsurface Utility Engineering
3D Subsurface Imaging • Utility Coordination
SECTION El -QUALIFICATION
INFO RMATION AND ASSIGNED
PERSONNEL
SURVEYING -CAS is one of South Florida tenured and respected surveying firms that provides
complete land surveying services. Our surveying staff is comprised of licensed land surveyors who
ad here to strict standards and give special attention to accuracy and detail. CAS utilizes the most up
to-date electronic survey equipment such as Topcon and Trimble SC Robotic Total Stations, Trimble
5800 RTK Base/Rovers, Leica P 30 Laser Scanners, Recon 400 TDS, TSCE 2 and Ranger 500X Data
Collectors along with Topcon ATC Levels and tablets. In addition, our survey crews have been trained
based on engineering principles and implement daily quality control measures ensure that our clients
receive the highest quality service and most accurate basemaps. CAS surveying services include:
•Mapping & Platting
•Boundary & Acreage Surveys
•Land Description Preparation
•Construction Surveys
•Subdivision Designs & Calculation
•GPS Mapping
•Route Surveys
•Canal Cross-Sections
•Parcel Description & Sketches
•Condemnation Surveys
•Highway Construction Surveys
•Quantity Surveys
•Accident Surveys
•As-Built Certifications
•Mean High Water Surveys
•Title Searches
•Drone Aerial Imagery and Surveys
CAS' "In-house"' surveying capabllltles ellmlnates the need for an addltlonal subconsultant for this
service and thus allows for more cost-effective and faster response to revisions or modifications to
basemaps or scope of work as requested by the City or as required for the duration of the contract.
I
m
� -
'
.---1�-�
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
� Craig A. Smith & Associates, Inc.
Engineers • Surveyors • Subsurface Utility Engineering
3D Subsurface Imaging • Utility Coordination
SECTION E1 -QUALIF ICATION
INFORMATION AND ASSIGNED
PERSONNEL
CADD (COMPUTER-AIDED DESIGN & DRAFTING) -CAS employs an on-staff Florida Certified American
Design & Drafting Association CADD operator and an Autodesk Certified professional. Our CADD
technicians prepare detailed drawings, layouts, exhibits, topographical maps, and graphic
representations of survey information & engineering designs. Designs relate to engineering projects
such as water, sewer, reclaimed water, paving and drainage systems. Craig A. Smith & Associates
prides itself on keeping its workforce educated and equipped to handle today's most challenging and
rewarding tasks. CAS is utilizing the latest AutoCAD software (Civil3D), custom-built AutoCAD systems
and functions, as well as some industry-first hardware including 3D laser scanning technologies. In
summation, the CADD systems CAS uses are:
•AutoCAD
•Autodesk 2019 Civil 3D
•Autodesk Map 30
The City will benefit from CAS' experienced CADD staff which wlll work closely with project managers
and City staff on assigned capital Improvement projects and provide any technlcal support to City staff
related to Autodesk Clvll & Map 30 use.
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
Craig A. Smith & Associates, Inc.
SECTION E1 -QUALIFI CATION
INFORMATION AND ASSIGNED
PERSONNEL•
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
� Craig A Smith & Associates, Inc.
Engineers • Surveyors • Subsurface Utility Engineering
3D Subsurface Imaging • Utility Coordination
SECTION E1 -QUALIFICATION
INFORMATION AND ASSIGNED
PERSONNEL
CONSTRUCTION MANAGEMENT -The CAS construction management team has a combined total
experience of nearly 80 years. CAS field representatives are qualified to perform a full-service
program, assuring total monitoring on-site to protect the client's interest on their projects. The CAS
construction management team will keep the client informed of all facets of construction including,
but not limited to, weekly progress notices, advice on any change orders and monthly monitoring of
project finances. The construction management team of professionals provides extra attention to
detail to ensure that all projects are built to specifications and are fully operational to meet the needs
of our client. CAS construction management services include:
•Value Engineering
•Design Document Review
•Contract Administration
•Contract Documents
•Construction Management
•On-site Representation
•Construction Engineering & Inspection
•Cost & Payment Verification
•Bidding Coordination
•Contract Negotiation
•Residential/Commercial/Municipal Project
Observations
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
� Craig A. Smith & Associates, Inc.
Engineers • Surveyors • Subsurface Utility Engineering
3D Subsurface Imaging • Utility Coordination
SE CTION E1 -QUALIFICATION
INFORMATION AND ASSIGNED
PE RSONNEL
GRANT ASSISTANCE EXPERIENCE
Since the early 1990's CAS has assisted our clients with securing grant funding and financing for
multiple infrastructure projects. We assisted our clients (municipalities, counties, special districts and
utility authorities) in obtaining grants and/or loans through multiple funding sources such as: USDA,
SRF, FEMA (HMGP), State Legislative Appropriations, SF WMD Cooperative Agreement Program, EPA
31.9 Program, CDBG, etc.
CAS assists our clients with the preparation of grant applications, supporting documents, such as
preliminary engineering reports, environmental assessments, preliminary designs, project scope
development, cost estimating, present worth cost analysis, cost benefit analysis, project beneficial
use, etc.
CAS continually provides many of these services to our clients annually for state appropriation
requests or during grant funding cycles. CAS provides grant evaluation for competitive grants requiring
scoring and consultation with respect to the need for phasing of projects to achieve a high success
rate from funding institutions.
CAS is continually involved with infrastructure funding assistance and has a high success rate in
securing funding. We understand the nuances of "grantsmanship." CAS is committed to providing
these services to all of our clients, with an estimated 70-80% of our on-going projects being funded
through our assistance. CAS is also aware of the deadlines required in achieving these grants/loans
and delivers grant assistance services on time.
Some of the capital improvement projects that CAS has acquired granting funding (indicating dollar
amount secured and funding source) are as follows:
•Town of Golden Beach Stormwater Improvements -$9,500,000 (FEMA Funded); $1,500,000 (SRF
Funded)
•City of Lake Worth Beach: Lake Osborne Estates Water Main Improvements -$2,153,224 (SRF
Funded)
•Spring Lake Improvement District (SLID): Design & Construction of a 70 Acres Stormwater
Treatment Area (STA) -$1.,666,000 (25% SRF /75% FDEP 31.9 Funded)
•Spring Lake Improvement District (SLID): Design and Construction of a 80,000 GPO Wastewater
Treatment Plant -$3,300,000 (SRF Funded)
•City of Moore Haven: Design and Construction of a 500,000 GPO ultrafiltration (Zenon) system to
expand an existing 750,000 GPO Lime Softening Water Treatment Plant -$3,663,800 (USDA
Funded)
•Town of Pembroke Park: Wastewater Master Plan for the rehabilitation of 22 Wastewater Lift
Stations -$1.00,000 (FDEP Legislative Funded)
•South Bay Water Treatment Plant and Water Distribution Improvements - $1.,200,000 (USDA
Funded)
•Port Labelle: Design and Construction of a 900, 000 GPD Reverse Osmosis Water Treatment Plant
(ROWTP) -$5,500,000 (USDA Funded)
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
� Craig A. Smith & Associates, Inc.
Engineers • Surveyors • Subsurface Utility Engineering
3D Subsurface Imaging • Utility Coordination
SECTION E1 -QUALIFICATION
INFORMATION AND ASSIGNED
PERSONNEL•
LOCAL STORMWATER/DRAINAGE PERMITTING & REGULATORY EXPERIENCE
CAS successfully completed the NE 174 th Street Roadway and Drainage Improvement Project which
consisted of a reconstruction of the drainage and the road for approximately 0.2 miles from Collins
Avenue to North Bay Road. The CAS Team has knowledge of local, state and federal regulations and is
aware of sea level rise forecasts and its impact on South Florida communities. Sea levels in South
Florida are expected to rise 40 inches in the next 50 years. Capital projects funded in 2021 under the
new State Legislation SB-178 shall consider the impact of rising sea levels and assess the
vulnerability of their facilities including utilities, surface water management, and other inf rastructures.
More specifically this bill requires all public entities that commissions or manages a construction
project within the coastal building zone (5000' + coastal control line from seasonal high water line)
using State funds, to conduct a Sea Level Impact Project (SLIP) study before construction. The SLIP
needs to be submitted to FDEP, signed by a professional engineer, and it will be published on FDEP's
website for at least 30 days before construction can start. This rule applies for all projects starting
construction after July 1, 2021 and it is the responsibility of the construction company. Some of the
main items that the SLIP will cover are the following:
•Assess the flooding, inundation and wave action damage risks faced by the structure over 50
years.
•The study must take into account the projected SLR and increase storm risks as well as land
subsidence.
•Potential public safety and environmental impacts resulting due to failures for leakage of
pollutants, electrocution and explosion hazards and floating of flying debris
•The study needs to include alternatives for the design and siting
•The study must analyze the risks and costs associated with maintaining, repairing and
constructing of the structure.
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
� Craig A. Smith & Associates, Inc.
Engineers • Surveyors • Subsurface Utility Engineering
3D Subsurface Imaging • Utility Coordination
SECTION E1 -QUALIFICATION
INFORMATION AND ASSIGNED
PERSONNEL
SIMILAR PROJECT EXPERIENCE WITHIN THE PAST 5 YEARS
WATER DISTRIBUTION. SEWER COLLECTION SYSTEMS & FORCE MAIN PROJECTS
•Glades County -Washington Park Sanitary Sewer Improvements-Phase I, Moore Haven, Rorlda
Status: On-going (Beginning Construction Phase)
Prime Consultant: CAS
Key CAS Staff: Gene R. Schriner, James Orth, Keith Schriner, Robert KeenerScope of Work: Survey, design, permitting, preparation of construction plans, cost estimates,
contract documents, assistance during bidding, construction management and certification
through project close-out for a new park/playground for residents, one (1) duplex submersible
sanitary sewer lift station, 1, 750-LF of FM, 9,630-LF of gravity sewer collection system, sewer
services for approximately 120 existing units with the potential of servicing approximately 300
units at residential buildout. Phase I includes the construction of the wastewater lift station,
force main and 800 linear feet of gravity sewer. This project is 50% CDBG funded with
matching funds being provided by Glades County.
Pro/ect Challenges & Approach: Engineering analysis was made to determine the optimal feasible
location of the wastewater lift station to maximize gravity sewer service connections prior to final
engineering design.
Design Cost Clncludlng Construction Management): $134,000
Construction Cost: $615,000
•City of Lake Worth Beach -Lake Osborne Estates Water Main Replacement Project -Phase I,
Lake Worth, Florida
Status: On-going (Construction Phase -75% Complete)
Prime Consultant: CAS
Key CAS Staff: James Orth, Dimitrios Scarlatos, Frank Vilar, Robert Keener, James F. Driscoll,
William TantoScope of Work: Survey, utility locates, design, permitting, preparation of construction plans, cost
estimates, contract documents, assistance during bidding, construction management and
certification through project close-out for the replacement of approximately 16,400 linear feet of
water main varying in size from 4" to 12" serving 228 homes in the Lake Osborne Estates
residential area. The majority of the existing water mains and water services are located in the
rear of properties and have exceeded their useful life, requiring relocation to the frontage of
homes. Addltlonal services Include public outreach and preparation of application package for
SRF funding. The contracted construction cost was approximately $800,000 below the engineers
estimate and SRF loan has been secured for the project. The project completion date has been
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
� Craig A. Smith & Associates, Inc.
Engineers • Surveyors • Subsurface Utility Engineering
3D Subsurface Imaging • Utility Coordination
SECTION E1 -QUALIFICATION
INFORMATION AND ASSIGNED
PERSONNEL
extended due to owner requested expansion to scope of work.
Pro/ect Challenges & Approach: Records drawings for this project are extremely limited. CAS
performed utility locates and coordinated with City O&M staff where necessary to verify locations
of existing water mains, valves and services and designed new water mains in a manner which
minimized water service disruption to customers and reduced restoration impacts to roadways,
driveways and landscaping. In addition, CAS through public informational meetings familiarized
homeowners with the project scope and involved them during the design process by incorporating
design elements such as location of water service lines and meter box location preferences on
their property and addressed any other concerns during the design and construction phase. In
addition, project construction scheduling (phasing) was clearly provided to homeowners well in
advance of construction.
Design Cost: $310,149
Construction Cost: $2,618,649
•Hardee County -Wauchula HIiis Water Main Improvements -Phase VI, Wauchula, Florida
Status: On-going (Construction Phase -60% complete)
Prime Consultant: CAS
Key CAS Staff: Gene R. Schriner, Greg Giarratana, Keith Schriner, Robert D. Keener
Scope of Work: Survey, design, contract document development, permitting, bidding, construction
management and observation through project close-out for the installation of approximately
1,000 linear feet of 6" water main, 4,000 linear feet of 8" water main, and 4,450 linear feet of 10
water main including roadway/driveway restoration including fire hydrants and valves, and
connections to existing 4" and 12" water mains.
Pro/ect Challenges & Approach: Community outreach and coordination with residents for water
service connections is essential for the successful completion of this project. Also close
coordination with the contractor during construction has been maintained in order to ensure that
driveway and roadway damage/restoration Is minimized.
Design Cost {Including Construction Management): $100,426
Construction Cost: $1,775,635
•Hardee County -Wauchula HIiis Water & Sanitary Sewer Improvements -Phase V, Wauchula,
Florida
Status: On-going (Construction Phase -80% complete)
Prime Consultant: CAS
Key CAS Staff: Gene R. Schriner, Greg Giarratana, Keith Schriner, Robert D. Keener
Scope of Work: Survey, design, contract document development, permitting, bidding, construction
management and observation through project close-out for the installation of approximately
7,500 linear feet of 8" water main including fire hydrants, one duplex submersible wastewater lift
station, approximately 1,500 linear feet of 6" force main and approximately 5,000 linear feet of
8" gravity sanitary sewer.
Prolect Challenges & Approach: Community outreach and coordination with residents for water
and sewer service connections is essential for the successful completion of this project. Also close
coordination with the contractor during construction has been maintained in order to ensure that
driveway and roadway damage/restoration is minimized.
Design Cost Clncludlng Construction Management): $221,453
Construction Cost: $2,068,956
•City of Margate -2018 Water Main Improvements, Margate, Aorlda
Status: On-going (Construction Phase -50% complete)
Prime Consultant: CAS
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
� Craig A. Smith & Associates, Inc.
Engineers • Surveyors • Subsurface Utility Engineering
3D Subsurface Imaging • Utility Coordination
SECTION E1 -QUALIFICATION
IN FORMATION AND ASSIGNED
PERSONNEL
Key CAS Staff: James Orth, Greg Giarratana, Keith Schriner, Robert Keener, James F. Driscoll, Tony
Gomes Scope of Work: Survey, design, utility locates, preparation of construction plans and contract
documents, permitting, bidding assistance, construction management and limited construction
observation through project closeout/start-up services for the replacement of 2-inch galvanized
steel water mains with 6-inch DIP at fifteen (15) different locations throughout the City including a
total water main replacement of approximately 12,000 linear feet, GPR scanning, locates, test
hole investigations, water service replacements, asbestos concrete pipe removal, fire hydrant
replacement, fire hydrant spacing analysis and a valve shutdown plan.
Pro/ect Challenges & Approach: The project area is discontinuous and the water main
replacements are being made in a corridor that Is very congested with burled utilities.
Comprehensive sub surface utility engineering was essential to determine a feasible new water
main alignment. The project is being constructed in phases in order to minimize restoration
Impacts at any given time. CAS is also coordinating closely with City staff to address any resident
concerns or complaints during construction.
Design Cost: $212,280
Construction Cost: $1,407,821
•Spring Lake Improvement District -Force Main & Water Main Installation Project to provide
service to the New Wastewater Treatment Plant, Sebring, Florida.
Status: Completed 201.9
Prime Consultant: CAS
Key CAS Staff: James Orth, Greg Giarratana, Keith Schriner, Robert Keener, James F. Driscoll,
Michael JonesScope of Work: Survey, design, preparation of construction plans, contract documents, permitting,
bidding, construction management and SRF funding assistance and administration through
project closeout/start-up services for the construction of 9,505 linear feet of 8"-1.0" force main
and water main to the New Wastewater Treatment Plant site. The project was 100% SRF funded.
This project was completed on time and within budget.
Design Cost {Including Construction Management: $125,500
Construction Cost: $750,000
•City of Belle Glade -Torry Island Sanitary Sewer Extension, Belle Glade, Florida
Status: Completed 2019
Prime Consultant: CAS
Key CAS Staff: James Orth, Al Caruso, Robert Keener, James F. Driscoll, Willian Tanto, Michael
JonesScope of Work: Survey, design, preparation of construction plans and contract documents,
permitting, bidding, construction management through project closeout for the extension of the
existing gravity sanitary sewer system at the Torry Island Campground and Marina. More
specifically the project included expansion of the existing gravity sewer collection system with 1.31.
sewer lateral connections to select campsites along Kentucky, Florida, Georgia, Main Street and
Liars Island. Design included installation of a private duplex lift station, 1.52 linear feet of 2" PVC
sewer force main, 1,546 linear feet of 8" gravity sanitary sewer with 8 associated manholes.
Additional improvements included electrical service upgrades and hose bib installations at each
campsite. This project was completed on time and within budget.
Design Cost: $1.83,200
Construction Cost: $1.,639,631
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
� Craig A. Smith & Associates, Inc.
Engineers • Surveyors • Subsurface Utility Engineering
30 Subsurface Imaging • Utility Coordination
SECTION E1 -QUALIFICATION
INFORMATION AND ASSIGNED
PERSONNEL
•Hardee County - Wauchula HIiis Water & Sanitary Sewer Improvements -Phase IV, Wauchula,
Florida
Status: Completed 2017
Prime Consultant: CAS
Key CAS Staff: Gene R. Schriner, Greg Giarratana, Keith Schriner, Robert D. KeenerScope of Work: Survey, design, contract document development, permitting, bidding, construction
management and observation through project clos�ut for the installation of approximately
6,125 linear feet of 8" water main and 5,277 linear feet of 8" gravity sanitary sewer including
connection to 51 private residences and the decommissioning of septic tanks. This project was
completed on time and within budget.
Pro/ect Challenges & Approach: Community outreach and coordin ation with residents for water
and sewer service connections was essential for the successful completion of this project. Also
close coordination with the contractor during construction was necessary in order to ensure that
road damage/restoration was minimized.
Design Cost Clncludlng Construction Management}: $189,628
Construction Cost: $1,249,013
•City-County Publlc Works Authority (CCPWA} -Avenue R Wastewater Collectlon/Conveyance
System Improvements, Moore Haven, Florida
Status: Completed 2017
Prime Consultant: CAS
Key CAS Staff: Gene R. Schriner, Keith Schriner, Greg Giarratana, Robert KeenerScope of Work: Survey, design, preparation of construction plans and contract document
development, permitting, bidding, construction management, const ruction observation through
project closeout/start-up services for the installation 1,200 linear feet of 8-inch FM replacement,
one (1) 180-linear foot directional drill, seven (7) sanitary sewer manhole structures, 2,800 linear
feet of gravity sewer, thirty-two (32) service laterals, fifty-two (52) clean-outs for residential hook
ups, roadway reconstruction. This project is a continuation of an existing system and part of a
gravity sewer collection master plan which addresses infrastructure needs within the southeastern
residential area of the City. This project was completed on time and within budget.
Design Cost {Including Construction Management}: $47,280
Construction Cost: $426,787
•Mlccosukee Tribe of Aorlda -Water Distribution System Improvements, Miami Dade, Aorida
Status: Completed 2015
Prime Consultant: CAS
Key CAS Staff: Gene R. Schriner, Greg Giarratana, Robert KeenerScope of Work: Survey, design, permitting, contract development, bidding services and construction
oversight for the installation of 15,000 LF of 12" water main which included eight (8) 12• diameter
horizontal dlrectlonal drllllng installations, one (1) s• horizontal dlrectlonal drill and new water service
lines to residences. This project was completed on time and within budget.
Design Cost: (Including Construction Management} $516,000
Construction Cost: $2,580,000
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
� Craig A. Smith & Associates, Inc.
SECTION E1 -QUALIFICATION
INFORMATION AND ASSIGNED
Engineers • Surveyors • Subsurface Utility Engineering
30 Subsurface Imaging • Utility Coordination
WASTEWATER LIFT & PUMP STATION PROJEClS
•City of Margate -Uft Station No. 7 Rehabllltatlon, Margate, Florida
Status: On-Hold as per Owner/Client's Request (Design Complete)
Prime Consultant: CAS
PERSONNEL•
Key CAS Staff: James Orth, Greg Giarratana, Keith Schriner, Robert Keener, James F. Driscoll, Tony
GomesScope of Work: Survey, design, preparation of construction plans and contract documents,
permitting, bidding assistance, construction management and limited construction observation
through project closeout/start-up services for the decommissioning the existing wet pit/dry pit lift
station and converting to a duplex submersible station along with the installation of a new wetwell
and valve vault. In addition, the installation of all stainless steel piping inside the proposed wet
well, relining existing structures, force main replacement, new water service line and backflow
preventer, fencing, and upgrading the electrical equipment including control panel and SCADA
system. This project is a continuation of a design that was started in 2008 and CAS was tasked to
update the design plans to current standards. Design was completed on time and within budget.
Pro/ect Challenges & Approach: This project consists of retrofitting the existing dry can wetwe/1
into a terminal sewer manhole and installing a new wetwe/1 within a congested utility area and
nearby overhead powerlines. A tremie-pour installation may be the preferred method of wetwe/1
construction for this project.
Design Cost: $54,932
Construction Cost Estimate: $ 560,000
•City of Margate -East WWTP Dumping Station Rehabllltatlon, Margate, Florida
Status: On-Hold as per Owner/Client's Request (Design Complete)
Prime Consultant: CAS
Key CAS Staff: James Orth, Greg Giarratana, Keith Schriner, Robert Keener, James F. Driscoll, Tony
GomesScope of Work: Survey, design, preparation of construction plans and contract documents,
permitting, bidding assistance, construction management and limited construction observation
through project closeout/start-up services for the replacing/rehabilitation of the City's existing
vacuum truck decant dumping station for storm, sewer and soft dig wastes. The project included a
report outlining the different options, demolition of the existing site, utility research within the
plant and improvements to the existing conveyance system. Design was completed on time and
within budget.
Pro/ect Challenges & Approach: The project scope entails retrofitting of the existing pump station.
Close coordination with the City's Plant Operator will be essential during the design process,
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
� Craig A. Smith & Associates, Inc.
Engineers • Surveyors • Subsurface Utility Engineering
30 Subsurface Imaging • Utility Coordination
SECTION E1 -QUALIFICATION
INFORMATION AND ASSIGNED
PERSONNEL
because record drawings for the project area are outdated and Incomplete. In addition, existing
soil conditions are not conducive to the use of GPR or other radar scanning equipment for locating
buried utilities.
Design Cost: $62,239
Construction Cost: TBD
•City of Margate -East WWTP Triplex Uft Station Reha bilitation, Margate, Florida
Status: On-Hold as per Owner/Client's Request (Design Complete)
Prime Consultant: CAS
Key CAS Staff: James Orth, Greg Giarratana, Keith Schriner, Robert Keener, James F. Driscoll, Tony
GomesScope of Work: Survey, design, preparation of construction plans and contract documents,
permitting, bidding, construction management and limited construction observation through
project closeout/start-up services for the removal and replacement of the station's existing
pumps, checks, valves and control panel. Design was completed on time and within budget.
Pro/ect Challenges & Approach: The project scope entails retrofitting of the existing pump station.
Close coordination with the cit y's plant operator will be essential during the design process,
because record drawings for the project area are outdated and incomplete. In addition, existing
soil conditions are not conducive to the use of GPR or other radar scanning equipment for locating
buried utilities.
Design Cost: $53,619
Construction Cost: $ TBD
•City of Margate -Uft Station No.21 Rehabilitation, Margate, Florida
Status: Completed 2020
Prime Consultant: CAS
Key CAS Staff: James Orth, Greg Giarratana, Keith Schriner, Robert Keener, James F. Driscoll, Tony
GomesScope of Work: Survey, design, preparation of construction plans and contract documents,
permitting, bidding, construction management and limited construction observation through
project closeout/start-up services for the decommissioning the lift station's existing dry pit and
retrofitting the existing wet pit into a duplex submersible lift station with above ground valves and
piping; including the installation of a retaining wall, relining existing structures, FOOT MOT, new
water service line and backflow preventer, fencing, and upgrading the electrical equipment
incl uding control panel and SCADA system.
Pro/ect Challenges & Approach: This project consisted of a lift conversion from a wet pit/dry pit to
a submersible type station within a limited easement area and low overhead powerlines.
Therefore, the design was modified to include above-grade piping, valves and fittings and the re
use of the existing wetwe/1.
Design Cost: $60,990
Construction Cost: $ 298,216
•Spring Lake Improvement District - Wastewater Treatment Plant Duplex Sanitary Sewer Lift
Station, Sebring, Florida
Status: Completed 2019
Prime Consultant: CAS
Key CAS Staff: James Orth, Greg Giarratana, Keith Schriner, Robert Keener, James F. Driscoll,
Michael JonesScope of Work: Survey, design, preparation of construction plans, contract documents, permitting,
bidding, construction management and SRF funding assistance and administration through
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.cralgasmith.com • LB3110
� Craig A. Smith & Associates, Inc.
Engineers • Surveyors • Subsurface Utility Engineering
3D Subsurface Imaging • Utility Coordination
SECTION E1 -QUALIFICATION
INFORMATION AND ASSIGNED
PERSONNEL
project closeout/start-up services for the construction of a new 15 HP duplex submersible lift
station rated at 510GPM @ 67 TOH with SCADA system and backup power generator to service
the new Wastewater Treatment Plant. The project was 100% SRF funded. This project was
completed on time and within budget.
Design Cost: $60,000
Construction Cost: $250,000
•City of Margate -Uft Station No.22 Rehabllltatlon, Margate, RorldaStatus: Completed 2017
Prime Consultant: CAS
Key CAS Staff: James Orth, Greg Giarratana, Keith Schriner, Robert Keener, James F. Driscoll, Tony
Gomes
Scope of Work: Survey, design, preparation of construction plans and contract documents,
permitting, bidding, construction management and limited construction observation through
project closeout/start-up services for the decommissioning the existing wet pit/dry pit lift station
and converting to a duplex submersible station along with installation a new wet well and valve
vault. In addition, the installation of all stainless steel piping inside the proposed wet well, relining
existing structures, manholes, gravity sewer, fencing, upgrading the electrical equipment, control
panel and installation of a SCADA system.Design Cost: $18,488
Construction Cost: $571,667
•Bal Harbour VIiiage -Wastewater Pump Station No. 3 and Gravity Sewer Improvements, Bal
Harbour, Florida
Status: Completed 2017Prime Consultant: CAS
Key CAS Staff: Stephen C. Smith, William H. Landis, Greg Giarratana, Al Caruso, James F. Driscoll,
Robert Keener, William Tanto
Scope of Work: Survey, utility locates, design, permitting, preparation of construction plans, cost
estimates, contract documents, assistance during bidding, construction management and
certification through project close-out for the installation of a new triplex submersible pump
station with a 12-foot diameter wetwell with electrical controls building and approximately 1,350
linear feet of 18" gravity sanitary sewer. This project was partlally grant funded and was
completed on time and within budget.Design Cost: $147,860Construction Cost: $1.985,000
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
� Craig A. Smith & Associates, Inc.
Engineers • Surveyors • Subsurface Utility Engineering
3D Subsurface Imaging • Utility Coordination
SECTION E1 -QUALIFICATION
INFO RMATION AND ASSIGNED
PERSONNEL.
SURVEYING & UTILITY LOCATING PROJEClS
tr
•City of Delray Beach -Lowson Boulevard Roadway & Drainage Improvements, Delray Beach,
Florida
Status: Completed 2019
Prime Consultant: Kimley-Horn & Associates, Inc.
Subconsultant: CAS
Key CAS Staff: Stephen C. Smith, James F. Driscoll, David Lookabill, Robert KeenerScope of Work: Survey of all above ground visible improvements and utilities within the right-of
way of Lowson Boulevard (SW 10th Street) and 10 feet beyond the right-of-way line from the east
right-of-way of Congress Avenue to the intersection of SE 6th Avenue. In addition, rims, pipe invert
elevations, sizes and pipe materials were acquired for all existing drainage structures within the
project limits. Subsurface utility engineering included soft digs at fifty (50) designated locations to
verify depths, sizes and materials of conflicting buried utilities. This project was completed on time
and within budget.
Project Cost: $58,550
•City of West Palm Beach -East Central Regional Water Reclamation Faclllty Record Drawing
Updates, West Palm Beach, Florida
Status: Completed 2019
Prime Consultant: Hazen & Sawyer, Inc.
Subconsultant: CAS
Key CAS Staff: Stephen C. Smith, James F. Driscoll, Robert Keener, David Lookabill, Donald DrakeScope of Work: Surveyed to establish horizontal control, benchmarks and locating all pertinent
above ground visible improvements and utilities within the project area. Utility surface designation
and mapping was performed utilizing 2D Ground Penetrating Radar, 3D Radar Tomography
scanning and calibration soft digs for approximately 260,000 ft2 of the facility to identify types,
sizes and locations of buried utilities. Deliverables included full electronic files containing CAD,
survey data and imagery collected and scanning performed for this project. All files were
compatible with the Civil 3D CADD platform. This project was completed on time and within
budget.
Project Cost: $36,330
•Seacoast Utility Authority -Northlake Boulevard Water & Force Main Replacement Project -
Phase �II, Palm Beach Gardens, Florida
Status: Completed 2018
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
� Craig A. Smith & Associates, Inc.
Engineers • Surveyors • Subsurface Utility Engineering
3D Subsurface Imaging • Utility Coordination
Prime Consultant: Hazen & Sawyer, Inc.
Subconsultant: CAS
SECTION E1 -QUALIFICATION
INFORMATION AND ASSIGNED
PERSONNEL
Key CAS Staff: Stephen C. Smith, James F. Driscoll, Robert Keener, David Lookabill, Donald Drake
Scope of Work: Performed surveying, mapping and utility locating and provide a pre-design survey
for 3 phases of a water distribution and sewer force main piping replacement project. CAS
performed a complete right-of-way survey which included all existing above-ground/below-ground
utilities, easements, trees, landscaping, property ownership and utility poles and wires. The
project included 1.3 miles of Northlake Boulevard from Old Dixie Highway (SR 811) in Phase 1, 1
mile of US Highway 1 from Northlake Boulevard south to Silver Beach Road in Phase 2, and 1.7
miles of US Highway 1 from Northlake Boulevard north to the North Palm Beach waterway in
Phase 3. 3D laser scanning was utilized to accurately capture point clouds in order to re-create all
surface objects. This project was completed on time and within budget.
Project Cost: $203,325
•Sunshine Water Control Dis trict West Outfall canal Survey -Phase 1A, 1C & 2, Coconut Creek,
Florida
Status: Completed 2017
Prime Consultant: CAS
Key CAS Staff: Gene R. Schriner, Robert Keener, James F. Driscoll
Scope of Work: CAS prepared 1.89 miles of topographic and route survey for the development of
engineering dredging plans. CAS performed a complete survey beyond the limits of the canal's
170-foot right-of-way including 100-foot cross sections for canal depth, utility locations, elevations,
trees and landscaping, and bridge pile configurations at Coral Springs Drive and Pump Station No.
2.This project was completed on time and within budget.
Pro!ect Cost: $45,032
•Mlaml-Oade Public Housing & Communi ty Development -Elizabeth Vlrrlck Public Housing Project
-Phase I & II, Miami-Dade County, Florida
Status: Completed 2017
Prime Consultant: CAS
Key CAS Staff: Stephen C. Smith, James F. Driscoll, Robert Keener, David Lookabill
Scope of Work: Provided field and office surveying services to produce a map of boundary and
topographic survey for Public Housing and Community Development Elizabeth Virrick I and II
public hou sing units. The scope of work included survey of all above ground, visible improvements
with pertinent elevations to 25 feet beyond each property line, on-site elevations relative to the
North American Vertical Datum (NAVO) of 1988 were collected on a minimum 50-foot grid,
generation of 1-foot surface contours, trees 4" of greater were located and shown with their
caliper sizes at breast height (ABH), outlines of onsite hedges and brush areas were located and
shown, surface elevations adjacent to trees were shown, drainage and gravity sewer structure
information was collected including pipe size, inverts, material and direction as available. Also
crown elevations were gathered along each adjacent road at approximately 50-foot intervals.
Utility locates were also performed to verify location of buried utilities within the project area. The
survey was conducted relative to the Florida Minimum Technical Standards as defined by chapter
MTS SJ-17, Florida Administrative Code. This project was completed on time and within budget.
Protect Cost: $9,266.17
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
� Craig A. Smith & Associates, Inc.
Engineers • Surveyors • Subsurface Utility Engineering
3D Subsurface Imaging • Utility Coordination
SECTION E1 -QUALIFICATION
INFORMATION AND ASSIGNED
PERSONNEL
•Palm Beach County Water Utllltles Department -Lake Region Water Treatment Plant (No. U)
Subsurface Utility Engineering (SUE), Palm Beach County, Florida
Status: Completed 2015
Prime Consultant: Baxter & Woodman, Inc. (former Mathews Consulting)
Subconsultant: CAS
Key CAS Staff: Stephen C. Smith, James F. Driscoll, Robert Keener
Scope of Work: Survey and subsurface utility engineering to locate existing utilities at water
treatment plant site for record drawing updates. Utility locates included establishing benchmarks,
horizontal control, depth, size, material and utility type including updated utility record drawings.
This project was completed within budget though there were delays in completion due to
misinformation provided by the owner reg arding the soil conditions in the project area. (Muck
within the project area was not removed as stated by the owner therefore locating of the buried
utilities could not be accomplished by 20 or 30 radar scanning and thus extensive vacuum soft
digs was required).Proiect Cost: $74,928
*CAS provided the professional surveying services necess ary for the successful design and
construction of all the water distribution, sanitary sewer system, pump/lift station,
stormwater/drainage and roadway projects listed in this section and the SF 330 Forms in Section E2.
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
� Craig A. Smith & Associates, Inc.
Engineers • Surveyors • Subsurface Utility Engineering
3D Subsurface Imaging • Utility Coordination
SECTION E1 -QUALIFICATION
INFORMATION AND ASSIGNED
PERSONNEL
STORMWATER/DRAINAGE & ROADWAY PROJECTS
•City of Pompano Beach -SW 2 nd Street Drainage Improvements, City of Pompano Beach, Florida
Status: On-going (Design 100% Complete, Bidding Phase in Progress -Awaiting SRF Funding)
Prime Consultant: CAS
Key CAS Staff: Stephen C. Smith, Frank Vilar, Robert D. Keener, Tony Gomes
Scope of Work: Engineering services for proposed drainage along SW 2 nd Street between Dixie
Highway and Cypress Road, SW 1st Avenue between SW 2 nd Street and Atlantic Blvd. CAS met with
City of Pompano Beach to discuss City concerns with flooding at the described project limits and
identify potential solutions. It is anticipated the proposed drainage improvements could include a
combination of new swale systems and new exfiltration trenches where feasible and utilization of
existing stormwater outfalls. The project scope is limited to implementation of new stormwater
management systems and does not include major roadway re-grading or full reconstruc tion. CAS
services include surveying, utility locates services, engineering design, permi tting, bidding and
negotiating services, construction management services and final certifications through project
closeout.Pro/ect Challenges & Approach: The project's existing site conditions include low site grade
elevations, lack of available land space and low soil permeability rates making it challenging to
implement new stormwater management design elements such as swales, retention areas and
exfiltration trench. Additional challenges included congested corridors with various existing
utilities that make it difficult to accommodate proposed exfiltration trenches within the road right
of ways. The project design approach included maximizing offsite discharge rates to maximum
allowable rates using two existing outfalls, creating new swale areas and implementing exfiltration
trenches to the greatest extent possible. The design also included improving stormwater
conveyance by expanding the current drainage system to encompass the entire drainage areas
through new interconnected catch basins and utilization of both existing stormwater outfalls.
Design Cost: $143,833
Construction Cost Estimate: $750,000
•Town of Pembroke Park -SW 25th Street Stormwater Improvements, Pembroke Park, Florida
Status: On-going (Bidding Phase)
Prime Consultant: CAS
Key CAS Staff: Stephen C. Smith, Frank Vilar, Robert D. Keener, Tony Gomes, William Tanto
Scope of Work: Multi-phase stormwater improvement project totaling 14.34 acres. Project scope
includes survey, hydraulic modeling, design, construction contract development and bidding
services for Phase I and II which was a 2.44 acre drainage sub basin area. The purpose of the
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
@@ Craig A. Smith & Associates, Inc.
Engineers • Surveyors • Subsurface Utility Engineering
3D Subsurface Imaging • Utility Coordination
SECTION E1 -QUALi Fl CATION
INFORMATION AND ASSIGNED
PERSONNEL.
project was to alleviate flooding in the Town of Pembroke Park by improving hydraulic conveyance
throughout the existing stormwater drainage system serving the 14.34 acre study area. A
hydraulic analysis to determine the acceptable level of service to the Town was performed by the
development of an ICPR model for the project area. In order to develop the ICPR model, a
comprehensive review of existing survey and utility information, available record drawings, aerial
photography and field investigations were performed. After the model was completed, proposed
recommendations were made for upsizing the existing stormwater drainage pipes by analyzing the
ICPR results for reduction in peak stages and flood duration times in the pre and post conditions.
Existing discharge pipes are proposed to be upsized from 24" to new 54" diameter drainage pipes.
Design Cost: $79,000
Construction Cost Estimate: $275,000 (Phase I & II}
•City of Belle Glade -2019 Road Resurfacing and Slgnage Upgrades (SCOP), Belle Glade, Florlda
Status: Completed 2019
Prime Consultant: CAS
Key CAS Staff: James R. Orth, Keith Schriner, William TantoScope of Work: The project consisted of roadway improvements on 25 roads city-wide totaling
approximately 6.4 miles and includes milling and resurfacing, pavement overlays, pavement
marking and signage improvements. Professional services included design, permitting, bidding
assistance and construction oversight. The project was funded by the FOOT Small County Outreach
Program (SCOP}. This project was completed on time and within budget.
Design Cost Clncludlng Construction Oversight}: $85,000
Construction Cost: $1,506,991
•City of Belle Glade -Orange Avenue Clrcle Roadway Improvements Belle Glade, Florida
Status: Completed 2019
Prime Consultant: CAS
Key CAS Staff: Gene R. Schriner, James R. Orth, Keith Schriner, Al Caruso, Robert Keener, James F.
Driscoll Scope of Work: Provide survey, utility locates, engineering design and bidding assistance for
roadway improvements to the Orange Avenue Circle Access Road from State Road 15 (Main
Street} west approximately 1,200 linear feet and provide proper connect ions at all connecting
streets. The proposed roadway will be a two-lane facility west of the FEC railroad tracks with 24
feet of pavement for two (2) 12-foot driving lane surfaces tapering from two lanes to three lanes
east from the railroad tracks to Highway US 98 including a turning lane at State Road 15 and 4
feet of shoulder on each side. CAS successfully acquired a FOOT driveway connection permit for
modifications to the existing access driveway. Design included drainage culverts. This project was
completed on time and within budget.
Design Cost: $59,600
Construction Cost: $295,000
•City of Belle Glade -SW 3rd Street Drainage Improvements, Belle Glade, Florlda
Status: Completed 2018
Prime Consultant: CAS
Key CAS Staff: James R. Orth, Keith Schriner, William TantoScope of Work: The project consisted of removal and replacement of existing failing catch basins
and CMP drainage pipes on approximately 350 linear feet of roadway in the downtown Belle Glade
area. This project was completed on time and within budget.
Design Cost {lncludlng Construction Oversight}: $57,800
Construction Cost: $294,486
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
� Craig A. Smith & Associates, Inc.
Engineers • Surveyors • Subsurface Utility Engineering
3D Subsurface Imaging • Utility Coordination
SECTION E1 -QUALIFICATION
INFORMATION AND ASSIGNED
PERSONNEL•·
•City of Moore Haven -Avenue R Stormwater Improvements, Moore Haven, Florida
Status: Completed 2018
Prime Consultant: CAS
Key CAS Staff: Gene R. Schriner, Orlando Rubio, Robert D. Keener, James F. Driscoll
Scope of Work: Survey, utility locates, design, preparation of construction plans and contract
document development, permitting, bidding, construction management, construction observation
through project closeout/start-up services for the installation of 1,200 linear feet of plastic swale
liner (1/4 section of 12-inch ID smooth inner wall perforated black P.E. pipe}, 350 linear feet of
PVC culverts, ten (10} concrete headwalls, one (1) drainage structure, 4,000 square yards of SOD
and the regarding of 4,000 square yards of swale. The project also involved the relocation of
existing utilities. This project was 100% grant funded and completed on time and within budget.
Design Cost Clncludlng Construction Management): $94,290
Construction Cost: $393,304
•City of Sunny Isles -174th Street Stormwater & Pavement Improvements, Sunny Isles Beach,
Florida
Status: Completed 2017
Prime Consultant: CAS
Key CAS Staff: Stephen C. Smith, Orlando Rubio, Robert D. Keener, Tony Gomes
Scope of Work: Survey, utility locates, design, stormwater modeling, cost estimating, contract
document devel opment and permitting for road and drainage improvements along 17 4th Street
which included reconstruction of existing roadway and drainage with a Hydrodynamic Separator
(Downstream Defender) for water quality treatment and a Tideflex Checkmate Valve for tidal
backflow prevention purposes, bike lanes, curbing, landscaping, parallel parking and traffic
calming. The project achieved improved drainage and road pavement, reduction in traffic speed,
enhanced pedestrian safety and street aesthetics. The project schedule was extended due to
owner Initiated change orders In the amount of $765,536.13.
Design Cost: $21 2,180
Construction Cost: $3,682,392
•Town of Pembroke Park -SW 31st Avenue Stormwater Improvements, Pembroke Park, Florida
Status: Completed 2016
Prime Consultant: CAS
Key CAS Staff: Stephen C. Smith, Frank Vilar, Robert D. Keener, Tony Gomes, William Tanto
Scope of Work: Survey and design of a stormwater management system to serve an existing 1.2
acre commercial/residential flood prone area in the Town of Pembroke Park. Proposed
improvements included 2,050 linear feet of roadway improvements by re-grading the existing
roadway from a crowned road to an inverted crown section and included addition of approximately
1,800 linear feet of exfiltration trench. Additional project related responsi bilities included
pavement marking & signage, permitting, cost estimating and preparation of the construction
contract documents and bidding services. Construction services were also provided and included
shop drawing reviews, review and approval of pay requests, general construction management,
field inspections to review Contractor installation of proposed work and final certification to all
regulatory agencies through project close-out. This project was completed on time and within
budget.
Design Cost: $56,000
Construction Cost: $565,000
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
� Craig A. Smith & Associates, Inc.
Engineers • Surveyors • Subsurface Utility Engineering
3D Subsurface Imaging• Utility Coordination
SECTION E1 -QUALIFICATION
INFORMATION AND ASSIGNED
PERSONNEL
•Glades Cou nty -Kirby Thompson Roadway & Drainage Improvements, Moore Haven, Rorlda
Status: Completed 2016
Prime Consultant: CAS
Key CAS Staff: Gene R. Schriner, Robert D. Keener
Scope of Work: Survey, design, contract document development, permitting, bidding, construction
management and observation through project close-out for roadway resurfacing, drainage and
striping for approximately four (4) miles along Kirby Thompson Road from the Hendry County line
to County Road 720. CAS utilized a new state-of-the-art design saving money and time through the
use of "Full Depth Reclamation", a process which is cost effective, providing a stronger pavement
with a longer life. This project was completed on time and within budget.
Design Cost (Including Construction Management): $195,610
Construction Cost: $1,679,114
•City of Belle Glade -2016 Road Resurfacing and Safety Upgrades (SCOP), Belle Glade, Florida
Status: Completed 2016
Prime Consultant: CAS
Appllcable Professional categories RFO 18-19-405: 119
Key CAS Staff: Stephen C. Smith, Frank Vilar
Scope of Work: The project areas totaled approximately 10,800 linear feet of roadway
improvements which included milling and resurfacing, pavement reconstruction, pavement
overlays, sidewalk installation, guardrail improvements and pavement marking and signage
improvements. Professional services included design, permitting and preparation of bid
documents. The project was funded by the FOOT Small County Outreach Program (SCOP) for road
improvements at 6 different locations in City of Belle Glade. This project was completed on time
and within budget.
Design Cost: $206,954
•City of Belle Glade -SE Avenue K Roadway and Drainage Improvements, Belle Glade, Florida
Status: Completed 2015
Prime Consultant: CAS
Key CAS Staff: Gene R. Schriner, Robert D. Keener
Scope of Work: The project consisted of survey, design and contract document development for a
quarter-mile of roadway reconstruction pavement resurfacing, drainage pipe upgrades, swale
restoration, striping and signage. Professional services included survey, engineering design and
development of construction plans, cost estimates, preparation of bid schedule and bidding
assistance.
Design Cost: $37,340
•City of Belle Glade -NW Avenue H Roadway and Drainage Improvements, Belle Glade, Florida
Status: Completed 2015
Prime Consultant: CAS
Key CAS Staff: Gene R. Schriner, Robert D. Keener
Scope of Work: The project consisted of survey, design and contract document development for a
half-mile of roadway reconstruction pavement resurfacing, drainage pipe upgrades, swale
restoration, striping and signage. Professional services included survey, engineering design and
development of construction plans, cost estimates, preparation of bid schedule and bidding
assistance.
Design Cost: $48,725
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
� Craig A. Smith & Associates, Inc.
Engineers • Surveyors • Subsurface Utility Engineering
3D Subsurface Imaging • Utility Coordination
SECTION E1 -QUALIFICATION
INFORMATION AND ASSIGNED
PERSONNEL
•City of Moore Haven Stonnwater System Improvements, Moore Haven, Florida
Status: Completed 2015
Prime Consultant: CAS
Key CAS Staff: Gene R. Schriner, Orlando Rubio, Robert D. Keener, James F. Driscoll, William TantoScope of Work: Planning, survey, utility locates, design, permitting bidding assistance and
construction management and inspection services for The Ranch Lakes Estates Improvements
Project for the City of Moore Haven which consisted of the construction of a gravity stormwater
drainage system along with two master stormwater pump stations including force mains and
canal dredging. Construction included the installation of 7,103 linear feet of HDPE drainage pipe
ranging in diameter from 15-inch to 48-inch, 1,044 linear feet of force main, 76 drainage
structures and two duplex stormwater pump stations. This project was completed on time and
within budget.
Design Cost Clncludlng Construction Management): $271,175
Construction Cost: $2,031,000
•City of Miami Beach - Palm & Hibiscus Islands Infrastructure Improvements Project, City of Miami
Beach, Florida
Status: Completed 2015
Prime Consultant: Wade Trim Associates, Inc.
Subconsultant: CAS
Key CAS Staff: Stephen C. Smith, Orlando Rubio, Tony GomesScope of Work: Drainage, roadway and stormwater pump station design, preparation of
construction plans for design-build team, permitting, coordination with team members,
construction observation through project closeout for infrastructure improvements consisting of
water main upgrades, utility relocation, new drainage systems with three (3) stormwater pump
stations along with Hydrodynamic Separators (Downstream Defenders) for water quality treatment
and Tideflex Checkmate Valves for tidal backflow prevention purposes, landscaping and roadway
reconstruction to address sea level rise. This project was completed on time and within budget.
Design Cost: $194,000
Construction Cost: $8,000,000
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
� Craig A. Smith & Associates, Inc.
Engineers • Surveyors • Subsurface Utility Engineering
3D Subsurface Imaging • Utility Coordination
SECTION E1 -QUALi Fl CATION
INFORMATION AND ASSIGNED
PERSONNEL
WATER RESOURCE & STORMWATER/SANITARY SEWER MASTER PLANNING PROJECTS
•City of Pompano Beach Non-Sewer Area C Sanitary Sewer Study, Pompano Beach, Rorlda
Status: Completed 2019
Prime Consultant: CAS
Kev CAS Staff: Stephen C. Smith, Frank Vilar, Robert D. KeenerScope of Work: CAS prepared an engineering design report to explore the various options available
for providing sewer service to approximately 62 acres comprising of a light industrial/small
commercial area where a number of the properties have little or no access to public streets and
limited right-of-way for the installation of a sanitary sewer system. The work included survey of
approximately 1,400 linear feet of the subject area and utilized GPS equipment of data collection
in both the horizontal and vertical planes creating a basemap of the project area with building
floor, road and parking lot elevations. Based on the findings and data collected CAS prepared a
report outlining design criteria, assumptions, baseline data, project cost estimates and included a
summary of the findings with proposed design alternatives clearly outlined with exhibits. The
Sanitary Sewer Study was completed on time and within budget.
Pro!ect Cost: $44,540
•Sunshine Water Control District West Outfall canal Improvements -Phase I & 1A, Coconut Creek,
Rorlda
Status: Completed 2017
Prime Consultant: CAS
Kev CAS Staff: Gene R. Schriner, Orlando Rubio, Robert D. KeenerScope of Work: The West Outfall Canal is the primary conveyance canal for the Sunshine Water
Control District's west basin serving 3,361-acres. The dredging project improved stormwater
conveyance to Pump Station No. 2 by widening and deepening the existing canal to improve flood
protection to the West Basin. The project entailed the removal of 19,500 cubic yards of material
to the targeted bottom elevation for the entire canal. The channel modifications improved
conveyance and allowed the pump station to perform more efficiently by reducing headloss in the
canal. Phase I of the project included dredging 2,900 linear feet of the overall 10,200 linear feet
West Canal. The project also included public outreach with individual homeowners to remove
encroachments within the canal right-of-way. This project was completed on time and within
budget.
Design Cost: $175,000
Construction Cost: $3,000,000
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
� Craig A. Smith & Associates, Inc.
SECTION E1 -QUALIFICATION
INFORMATION AND ASSIGNED
Engineers • Surveyors • Subsurface Utility Engineering
3D Subsurface Imaging • Utility Coordination PERSONNEL
•Sprtng lake Improvement District Stormwater Treatment Area Project, Sebring, Florida
Status: Completed 2017
Prime Consultant: CAS
Key CAS Staff: Gene R. Schriner, Orlando Rubio, Robert D. KeenerScope of Work: Survey, design, stormwater modeling, cost estimating, contract document
development and permitting for the construction of a 70 acre stormwater treatment area (STA) to
provide additional water quality treatment benefits prior to discharging into Arbuckle Creek and
provide added storage during rain events thus reducing flooding. Secured grants for this project
were as follow: State Appropriation $416,000 and two 319 FDEP grants $1,250,000. The projectwas completed on time and within budget.
Design Cost: $462,560Construction Cost: $3,304,579
•VIiiage of El Portal Sanitary Sewer Master Plan, El Portal, Florida
Status: Completed 2017
Prime Consultant: CAS
Key CAS Staff: Stephen C. Smith, Orlando Rubio, Greg Giarratana, Al Caruso, Robert D. KeenerScope of Work: The Sanitary Sewer Master Plan was a comprehensive report to define prior ity
areas and determined corrective actions required to convert from a decentralized wastewater
treatment system (septic system) to a new sanitary sewer gravity collection system with lift
stations. The Master Plan also included a comprehensive survey base map for the entire village,
hydraulic sewer modeling and the overall design of eighteen phases of construction. The sanitary
sewer systems were developed using best management practices, current levels of service, and
investigated various funding sources. The Master Plan was completed on time and within budget.
Project Cost: $75,000
•Village of Biscayne Park Stonnwater Master Plan, Biscayne Park, Rorlda
Status: Completed 2016
Prime Consultant: CASKey CAS Staff: Gene R. Schriner, Orlando Rubio, Albert J. Caruso, Robert KeenerScope of Work: The Stormwater Master Plan was a comprehensive report to define priority areas,
determined corrective actions required to resolve flooding conditions and established a level of
service. The Master Plan also included a comprehensive survey base map for the entire village
including stormwater modeling and the design of five stormwater networks that would take into
account future sea level rising. The stormwater systems were developed using best management
practices while addressing water quality and water quantity concerns. The estimated total cost of
the village's stormwater improvements were estimated at $13.08 Million. The Master Plan was
completed on time and within budget.Project Cost: $134,500
.. ' . . _,,-�
� ... te,.....,,�
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
� Craig A. Smith & Associates, Inc.
Engineers • Surveyors • Subsurface Utility Engineering
3D Subsurface Imaging • Utility Coordination
SECTION E1 -QUALIFICATION
INFORMATION AND ASSIGNED
PERSONNEL
•Bal Harbour VIiiage Stormwater Master Plan, Bal Harbour, Florida
Status: Completed 2015
Prime Consultant: CAS
Key CAS Staff: Stephen C. Smith, William H. Landis, Albert J. Caruso, Orlando Rubio, James F.
Driscoll, Robert KeenerScope of Work: A comprehensive CIP project within the Village included roadway and stormwater
elements that identified and determined corrective actions required to resolve existing flooding
conditions throughout the Village. The Master Plan included preliminary survey and calculations,
drainage and roadway design that would take into account future sea level rising, and preliminary
cost estimates in the development of new stormwater systems, through best management
practices, while addressing water quality and water quantity concerns. The estimated total cost of
Village-wide road and stormwater improvements was $15.9 Million. The Master Plan was
completed on time and within budget.
Pro!ect Cost: $136,675
*Please refer to Section E2 -Prime Consultant SF330 Forms for further project experience
information.
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
� Craig A. Smith & Associates, Inc.
Engineers • Surveyors • Subsurface Utility Engineering
3D Subsurface Imaging • Utility Coordination
KEY CAS PERSONNEL EXPERIENCE
MANAGEMENT & ADMINISTRATION
Stephen C. Smith, P.E., President/CEO. Mr. Smith's responsibilities include management of daily
business operations for 40+ member civil engineering and surveying firm with gross sales of $5.5+
million. Oversee all areas of business including engineering, surveying, construction management
services, accounting and human resources. He ensures proper allocation of resources, staffing, financial
management, quality control and timely project completion. Mr. Smith managed the survey, utility
locating, design and construction of approximately 15,000 linear feet of 6"-12" water mains for the
Town of Golden Beach as part of a complete retrofit of the town's entire existing water distribution
system. In addition, Mr. Smith was responsible for the master planning, project management, resource
allocation and quality assurance of the stormwater design, as well as the project management of
stormwater construction projects for the City of Sweetwater, Miami-Dade and the City of Oakland Park.
He has extensive experience in the design and management of roadway improvement projects as well.
Mr. Smith was responsible for the Andrews Avenue Widening and Intersection Improvements in Broward
County and roadway widening and intersection improvements for Biscayne Boulevard from NE 163rd
Street to 203 rd Street (along with stormwater improvements) and the 174th Street Stormwater and
Pavement Improvements for the City of Sunny Isles Beach. Mr. Smith completed a Bachelors of Science
in Civil Engineering & Building Construction from Auburn University. He wlll be the Prlnclpaf.ln-Charge,
client llalson and wlll be ensuring that the necessary resources and staff are provided for each assigned
project throughout the duration of the contract.
ENGINEERING
Orlando Rubio, P.E., Senior Supervising Engineer, will serve as the Project Manager. Mr. Rubio has
over 30 years of experience as a project manager and designer in water resource engineering related
various surface water management systems and roadway improvements. Mr. Rubio is responsible for
the development of project scopes, overall project management, engineering design, stormwater
master plans, State & Federal Grant applications, advanced stormwater modeling using ICPR,
Hydraflow, & HEC-RAS modeling software programs, and engineering services during construction.
Mr. Rubio also conducts field and office visits with clients, permitting agency staff, and other project
coordination as necessary. In the past, Mr. Rubio has worked for regulatory agencies at the county
and state level in South Florida. Mr. Rubio has extensive experience reviewing complex surface water
management license applications consisting of administrative and legal data, engineering reports,
computer program output and construction plans. Mr. Rubio conducted reviews in accordance with
established criteria, engineering principles, and normal construction practices to produce technical
engineering reports related to stormwater/drainage projects. Mr. Rubio coordinated reviews with the
SFWMD, FDEP and/or County agencies and the delegation of the Environmental Resource Permitting
program for Broward County from SFWMD and FDEP. Mr. Rubio's extensive stormwater design
exp erience in South Florida includes both gravity and pumped drainage systems. He was responsible
for the design, permitting and construction management of the NE 174th Street Roadway and
Drainage Improvements project for the City of Sunny Isles Beach. He has earned a Bachelors of
Science in Civil Engineering from the University of Florida. Mr. Rubio wlll provide stormwater/dralnage
and roadway engineering design, permitting, hydraulic modeling and construction management services
along with overall project managemenVcoordlnatlon for all assigned projects on an as-need basis.
Frank VIiar, P.E., Senior Supervising Engineer. Mr. Vilar has over 23 years of professional experience
managing and designing numerous public and private sector utility/infr astructure projects throughout
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
Craig A. Smith & Associates, Inc.
SECTION E1 -QUALIFICATION
INFORMATION AND ASSIGNED
PERSONNEL
roadway
Senior Supervising Engineer.
Al Project Engineer,
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
� Craig A. Smith & Associates, Inc.
Engineers • Surveyors • Subsurface Utility Engineering
30 Subsurface Imaging • Utility Coordination
SECTION E1 -QUALIFICATION •·
INFORMATION AND ASSIGNED :.
PERSONNEL •·
feasibility studies for projects including bidding services and close-out packages. He also is responsible
for project coordination with clients, municipalities, permitting agencies and contractors to ensure that
projects meet their budget goals and are completed within the scheduled timeframe. In addition, Mr.
Caruso has extensive experience in developing utility master plans and providing technical reporting to
regulatory agencies for water and sewer projects. Mr. Caruso also has extensive experience in document
preparation for grant funding assistance. He retains an Associates Degree in Engineering Technology
from Middlesex County College. Mr. caruso wlll provide any addltlonal design support, technical report
writing and grant administration assistance (as needed) for the duration of the contract.
Keith Schriner, Design/Field Engineer. Mr. Schriner received a degree of Bachelor of Science in Civil
Engineering from the University of Central Florida with focus in water resources. Mr. Schriner has been
responsible for the design and construction management of several wastewater lift stations at the City
of Margate, Hardee County's Wauchula Hills Gravity Sewer Extension Project -Phase V, City-County
Public Works Authority (CCPWA) -Avenue R & 4™ Street Sanitary Sewer Extension consisting of
2,550 linear feet of 8" gravity sanitary sewer including seven (7) manholes and Spring Lake
Improvement District Wastewater Treatment lift station and force installation. Mr. Schriner also
provided technical support for an SRF funding application for over $2 million associated with the City
of Lake Worth Beach's Lake Osborne Estates Water Main Replacement Project which entails the
replacement of over 16,000 linear feet of old asbestos concrete and galvanized steel water mains. Mr.
Schriner wlll be providing design, pennlttlng and construction management services for water
distribution systems, wastewater conveyance/collectlon systems and granVtoan funding assistance
support.
SURVEY & MAPPING
Robert D. Keener, P.S.M., Vice President of Surveying, has been licensed in the State of Florida for 22
years and with over forty (40) years of surveying experience in utility design, construction and master
planning. As Vice President of the CAS Survey Division, Mr. Keener heads a qualified survey staff that
includes both CADD and field personnel. His staff is proficient with the latest survey technology
available to the industry. Mr. Keener will serve as Principal Surveyor for all surveys and will coordinate
all survey activities with various disciplines as needed. All utility related components such as 2D
Ground Penetrating Radar, 3D Radar Tomography, Utility Surface Mapping, Utility Excavations, etc. will
be certified by Mr. Keener. Mr. Keener holds a Florida Surveyors and Mappers License and is a
member of the Florida Surveying and Mapping Society of Florida. Mr. Keener wlll be responslble for
coordinating all surveying and mapping efforts for the duration of the contract.
CADD
Mike Marenco, CADD Manager, has 15 years of experience in computer aided design and drafting as it
applies to survey, engineering and utility construction fields. Mr. Marenco is responsible for managing
the CADD staff and ensuring deadlines for engineering or survey basemap plans are met. Mr. Marenco
is also proficient in preparing detailed drawings, layouts, exhibits, topographical maps, and graphic
representations of survey information as well as engineering projects such as water distribution, sewer
collection, paving and drainage systems. Mr. Marenco wlll be responslble for coordinating with the
engineering and survey staff for all drafting.related tasks for the duration of the contract.
CONSTRUCTION INSPECTION
Tony Gomes is a Senior Field Representative. Mr. Gomes has over 40 years experience and provides
assistance to the Project Engineer for the inspection of work accomplished and materials furnished by
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
� Craig A. Smith & Associates, Inc.
Engineers • Surveyors • Subsurface Utility Engineering
3D Subsurface Imaging • Utility Coordination
SECTION E1 -QUALIFICATION
INFORMATION AND ASSIGNED
PERSONNEL
contractors, with specialized expertise in utility pipeline (water and wastewater), roadway, drainage and
bridge construction. Mr. Gomes wlll be providing cons truction Inspection services for the duration of the
contract.
Wllllam Tanto is a Project/Field Utility Coordinator. Mr. Tanto provides assistance to the Project
Engineers for the inspection of work accomplished and materials furnished by the contractor with
specialized expertise in utility pipeline (water and wastewater), roadway, drainage and bridge
construction. Mr. Tanto wlll be providing construction Inspection services for the duration of the contract.
SUBSURFACE UTILnY ENGINEERING {lJTILnY LOCATES)
James F. Drlscoll is the Director of Subsurface Utility Engineering (SUE). Mr. Driscoll has 29 years of
experience in the engineering, survey and utility locates fields. Mr. Driscoll coordinates the utility
locate crews that perform horizontal locates as well as vertical utility locating using both vacuum
pothole excavation, electromagnetic induction (EM) for toned utilities, 2-D ground penetrating radar
(GPR) and 3-D scanning (radar tomography). Mr. Driscoll wlll be responslble for coordinating all
aspects of subsurface utlllty engineering (utlllty locates) as needed for the duration of the contract.
Alan Lopez is the Utility Locates (SUE) Field Supervisor. Mr. Lopez has 19 years of experience in the
survey, utility locating and utility construction fields. He has performed or overseen in excess of 5,000
vacuum soft digs and conduc ted thousands of 2-D ground penetrating radar studies and 3-D radar
tomography scanning's for buried utility mapping efforts. Mr. Lopez wlll be responslble for providing
fleld supervision for subsurface utlllty engineering (utlllty locates) services as needed for the duration
of the contract.
0
�h .: 34 inches Depth = l4 ini:he1i
*Please refer to Section E2 -Prime Consultant SF 330 Forms for further information on key staff.
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
� Craig A. Smith & Associates, Inc.
Engineers • Surveyors • Subsurface Utility Engineering
3D Subsurface Imaging • Utility Coordination
SECTION E1 -QUALIFICATION
INFORMATION AND ASSIGNED
PERSONNEL
CAS TEAM (SUBCONSULTANTI EXPERIENCE
The CAS Team Is an experienced team which has worked together to successfully complete numerous
munlclpal utility and Infrastructure capital Improvement pro!ects throughout South Florida.
S ith E • • Smith Engineering Consultants, Inc. (SEC) is a multi-" . ffl ng1neenng disciplined consulting engineering firm specializing
1 in electrical, instrumentation and SCADA system Consultants,ln c. designs for Water/Wastewater, Stormwater and
lighting projects. SEC has a niche for providing
professional services on such civil engineering projects. Their experienced staff have in-depth
knowledge of energy, water, telecommunications, transportation and architectural projects. Their cost
effective and energy efficient designs provide facility owners with security in the knowledge that their
operating expenses are among the lowest in the area. Whether a client's project calls for new
construction or the renovation of aging facilities, their staff can provide planning and design services,
cost estimates, and construction phase services. SEC has built a deserved reputation for completing
assignments in a cost-effective and timely manner. You can count on SEC to provide the detailed plans
and specifications necessary for smooth construction, start-up, and operation. They interface with
design engineers from complimentary disciplines during the design process to review design principles
and to assist in the preparation of design drawings and specifications for specific project needs. The
firm will be providing all electrical engineering work related to lift and pump stations, street lighting
and other facilities necessary to complete projects under this contract. SEC recently provided electrical
engineering services for CAS which Included site lighting and electrical plans for 2 multi-purpose
fields, an amphitheater and associated parking lot for the Acreage Community Park South Expansion
project, electrical and control panel upgrades for Sun-N-Lake Improvement District's Mantanms
Wastewater Lift Station and Glades County's Washington Park Wastewater Lift Station. Below is a list
of municipal clients in the Tri-County area that Smith Engineering Consultants has provided electrical
engineering services for utility and infrastructure projects.
City of Atlantis
City of Homestead
City of Boca Raton
City of Pompano Beach
City of Delray Beach
Town of Jupiter
Town of Manalapan
City of Lake Worth Beach
Northern Palm Beach County Improvement District
Palm Beach County Solid Waste Authority
Indian Trail Improvement District
Town of Palm Beach
Palm Beach County
City of West Palm Beach
Village of Royal Palm Beach
Village of Wellington
Broward County Aviation Department
City of Ft. Lauderdale
City of Boynton Beach
City of Hallandale Beach
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
SECTION E1 -QUALIFICATION
� Craig A. Smith & Associates, Inc.
Engineers • Surveyors • Subsurface Utility Engineering
3D Subsurface Imaging • Utility Coordination
INFORMATION AND ASSIGNED
PERSONNEL·
City of Doral
City of Belle Glade
Beeline Community Development District
Town of Lantana
City of Palm Beach Gardens
City of Sunrise
City of Fort Lauderdale
City of Miami Beach
Lake Worth Drainage District
Florida Department of Transportation
South Florida Water Management District
Below is a sample list of successfully completed water, wastewater and stormwater related projects:
Palm Beach County
WTP No. 8 Wellfield Cable Replacement
WTP No. 8 UPS Installation
CROC Generator to SCADA Connection
PS 5229 Arc Flash & Condition Assessment
PS's 9S, 9N, & 5 Arc Flash & Condition Assessment
PS's 4i00, 5241, & Mecca Arc Flash & Condition Assessment
SRWRF Biogas Generators
Pahokee WWTP Arc Flash & Condition Assessment
Belle Glade WWTP Arc Flash & Condition Assessment
WTP No. 8 Arc Flash & Condition Assessment
SRWRF PLC Programming
Belle Glade WWTP PLC Programming
2016 Telemetry Information Management System (TIMS) Lift Station Upgrades, Design and
Construction Phase Services
2017 Telemetry Information Management System (TIMS) Improvements, Design and Construction
Phase Services
WUD Electrical Safety Plan
SRWRF PLC Programming
SRWRF Electrical Master Plan
Belle Glade and Pahokee WWTP Electrical Switchgear Assessment
Morikami SCADA Tower Design and Construction Phase Services
Miscellaneous Services (Morikami Park Pump Station, Other smaller projects)
City of West Palm Beach
Lift Station No. 5 Electrical Service Relocation
Lift Station No. 75 Improvements
Lift Station No. 4, 7, and 153 Improvements
Lift Station No. 74 Improvements
Lift Station No. 44 Improvements
Renaissance Project Stormwater Treatment and Pump Station
Water Treatment Plant Generator Replacement
Town of Jupiter
R.O Well No. i2 Acid Spill Report
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
� Craig A. Smith & Associates, Inc.
Engineers • Surveyors • Subsurface Utility Engineering
3D Subsurface Imaging • Utility Coordination
N.Central Pump Station VFD's
WTP High Service Pumps Replacement
WTP Wells Installation
WTP Transfer Pump Installation
Town of Palm Beach
Wastewater Flow Meter Installation
Stormwater Pump Stations D-6 & D-7
Stormwater Pump Station D-10
Stormwater Pump Station D-9
El Brillo and Jungle Road Lift Station Generators
Village of Wellington
SECTION E1 -QUALIFICATION
INFORMATION AND ASSIGNED
PERSONNEL
Stormwater Pump Stations 3, 6, & 7 VFD Installat ions
Stormwater Pump Stations 4 & 8 VFD Installations
Binks Forest Lift Station
Water Level Monitoring Sites
Village Utilities Standards Design Update
Village Royale Lift Station
Multiple Village Lift Station Evaluations
City of Fort Lauderdale
George T. Lohmeyer WWTP Effluent Pumps VFD Replacement
Peele-Dixie WWTP Electrical Service Modifications
Fiveash WTP Backwash Pump Replacement
George T. Lohmeyer WWTP Arc Flash Study
SEC also has in-depth knowledge of lighting design projects. Their cost-effective and energy efficient
designs provide facility owners with security in the knowledge that their operating expenses are
among the lowest in the area. Whether projects require new construction or the renovation of aging
fa cilities, SEC staff can provide planning and design services, cost estimates, and construction phase
services related to street lighting projects. They have extensive experience in the following areas of
electrical engineering design applicable to lighting projects: electrical service and distribution design;
conventional, decorative, and high mast lighting design (including illumination calculations
(photometrics)); signalization (including signal timing, cable diagrams, system quantities and conduit
sizing calculations, and programmable logic controller integration); and electrical power systems
analysis (including voltage drop calculations, short-circuit coordination, and ar c-flash).
SEC has established a reputation for completing assignments in a cost-effective and timely manner.
They have accomplished this through innovative thinking, careful planning, and professionals who
believe in quality and hard work. You can count on SEC to provide the detailed plans and
specifications necessary for smooth construction, start-up, and operation. SEC has completed
numerous successful lighting projects for the City of West Palm Beach.
Smith Engineering Consultants, Inc. is a Certified CSE firm with Broward County and will be providing
electrical engineering services for the duration of this contract.
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
�
SECTION E1 -QUALIFICATION
INFORMATION AND ASSIGNED
PERSONNEL Craig A. Smith & Associates, Inc.
Engineers • Surveyors • Subsurface Utility Engineering
3D Subsurface Imaging • Utility Coordination
Founded in 1997, RADISE International, L.C. (RADISE) specializes -: RAD IS E in providing Geotechnical Engineering, Materials Testing and
Inspection Services. RADISE has a staff of 64 including local
professional engineers, field and laboratory technicians, geo
technical drillers, inspectors and support staff servicing Miami I N T E R N A T I o N A L Dade, Broward and Palm Beach Counties. Our senior staff has
250+ years of combined Geotechnical Engineering, Materials Testing and Inspection experience.
RAD/SE has been serving Florida for 20 years, and has always been a financially sound firm. They have
a history of no litigation, and maintain a safety first record of no OSHA lost time.
Spectallzed Experience and Technical Competence are as follows but are not llmlted to: • • • • • •
• • • •
Geotechnical Engineering Services (subsurface studies)
Geotechnical Drilling (Standard Penetration Test borings)
Foundation Analysis (recommendations and design)
Bridge Piling Design including WEAP Analysis
Construction Materials Testing and Inspections, including soils & concrete tests
Construction Monitoring and Inspections (CEI), including PDA, driven pile inspections, vibro
compaction/replacement oversight, auger cast pile load test and production pile monitoring,
post-tension inspections and vibration monitoring.
Masonry Tests, Asphalt Monitoring and Tests
Non-destructive tests (Impact Hammer and Windsor probe)
Special and Threshold Inspection Services
Geosynthetic Materials (geomembranes, geotextiles, geonets and geosynthetic clay liners)
Inspections
As experts in providing geotechnical engineering and materials testing and inspection services, they are
skilled in conducting site investigation, evaluation, design and preparation of engineering plans;
preparing specifications and contract documents; master planning, permit preparation construction
inspections/oversight; as well as serving as liaison with project owners, cities, counties, consultants,
agencies and stakeholders. They perform all drilling in-house with multiple truck and track mounted
drill rigs. RADISE is also an FOOT CTQP Training Provider, training in-house staff, FOOT personnel and
outside clients.
Offices and Certified Testing Labs: RADISE has 3 offices in Palm Beach, Broward and Miami-Dade
Counties; and 2 certified construction materials testing laboratories in Palm Beach
(FOOT/CMEC/USACE certified) and Broward (FDOT/CMEC certified) Counties.
Experience: For over 20 years, RADISE has provided geotechnical engineering, field and lab
construction materials testing, inspection and quality control services for projects throughout Florida.
Their significant experience and a solid background working with both the Public and Private Sectors in
South Florida includes continuing service contracts with numerous Cities, Counties, and School
Districts, and they work extensively with the SFWMD, FOOT and USACE, on operations that run 24/7
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
� Craig A. Smith & Associates, Inc.
Engineers • Surveyors • Subsurface Utility Engineering
3D Subsurface Imaging • Utility Coordination
SECTION E1 -QUALIFICATION
INFORMATION AND ASSIGNED
PERSONNEL
Quallty Control: RADISE developed and utilizes a Quality Control System that is a powerful, web-based
application. The QC system enhances project success with features that sim plify reporting, and create
instant results/reports for clients, 24/7, accessible via the internet. The QC System has proven to be a
significant advantage when reporting to the level that is required by many agencies.
RADISE International also offers engineering inspection and testing services to clients to confirm the
quality of the work performed and construction materials used in their projects. RADISE's engineering
inspectors and technicians are trained to monitor and record workmanship and to inspect and
document material conformance to project specifications. Their involvement helps prevent deviations
that can affect the quality or compromise the design of projects.
RADISE Certified or Validated test methods (CMEC/AMRl/USACE'/FDOT)
•Soil •Bituminous
•Aggregate •Masonry
•Concrete •Rock
Mr. Andrew Nixon has coordinated closely with CAS as project manager in providing geotechnical
services for numerous project for CAS throughout South Florida. Mr. Nixon was responsible for
ensuring quality and timely geotechnical services for a myriad of utility projects (i.e., water main,
sewer force main, drainage, roadway and pump station projects) designed and managed by CAS for
the following municipal clients:
Sunny Isles Beach
Indian Trail Improvement District
Spring Lake Improvement District
City of Margate
City of Moore Haven
Hardee County
Okeechobee County
City of Belle Glade
In addition, RADISE is currently part of the CAS Team and provides geotechnical engineering services
for the City of Margate, Sunshine Water Control District and the City of Delray Beach NW
Neighborhood Improvement Project.
RADISE Is a Certified SBE-M/WBE firm with the Palm Beach County, M/WBE State certified Rorlda
DOT DBE and South Rorlda Water Management District SSE and will be providing geotechnical,
material testing and construction oversight/engineering and inspections (CE/) support services for the
duration of this contract.
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
Craig A. Smith & Associates, Inc.
SECTION E1 -QUALIFICATION
INFORMATI ON AND ASSIGNED
PERSONNEL.
DAm,llo AJamll & """"'
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
�
SECTION E1 - QUALIFICATION •.
Craig A. Smith & Associates, Inc.
Engineers • Surveyors • Subsurface Utility Engineering
3D Subsurface Imaging • Utility Coordination
INFORMATION AND ASSIGNED
PERSONNEL
Bermello Ajamil & Partners, Inc. will be providing Environmental Engineering and Public Outreach
services from their Miami office location for the duration of this contract.
-�ineers, Inc.
MUE Engineers, Inc. is a full service, dynamic
structural engineering, and inspection firm. They have
a sound understanding of all types of building
processes and provide services for commercial,
industrial, legal, and residential clients for any type and size of project. Whether they are designing a
one floor, an eight floor or a thirty-floor building, it is important to select the structural system which
best suits the project, while keeping in mind the project budget, constructability, and local
construction techniques and methods.
Founded in 2010, MUE provides a full range of structural engineering services, including: structural
design, specialty engineering, structural assessments, threshold, special and 40-year inspections,
restoration and peer reviews and feasibility studies. Their professional experience covers a
comprehensive array of projects including: multi-family and condominium residences, custom single
family residences, car dealerships, hotels, parking garages, road/pedestrian bridges, fire stations,
public safety complexes, police stations, public parks, lifeguard towers, sea wall restoration and
repair, retail structures, municipal facilities, office buidings, courthouses, etc. In addition to new
construction, they have extensive experience with remodels, restorations and renovations of existing
structures needing additional space, upgrades, or repairs of failing structural components. Example
projects include: wood observation deck and tower repairs, hotel remodels, sea wall restorations,
water proofing replacements, all types of concrete restoration and corrosion protections,
streetscaping improvements, airport expansions, water park features, etc.
MUE has extensive experience in the public sector and have been involved on numerous city and
county continuing contracts within the state. Their involvement with these projects have ranged to
structural design and engineering of new fire stations, maintenance buildings, adm inistration
buildings, park observations walkways, boardwalks, gazebos and restrooms, to the remodel,
conversion or restoration of existing structures, such as police stations, sea walls, jetties, piers and
park structures. MUE has/is working on several successful projects, including structural modifications
and inspections to the Pompano Beach Airpark Water Treatment Plant Control Room, Administration
Building and Control Tower.
MUE is a Broward County-Certified CBE firm and provides services to commercial, industrial,
municipal, legal and residential clients for projects of all types and sizes as stated above.
MUEngineers is committed to providing innovative, sustainable and high quality design solutions
to meet and exceed client expectations and needs.
Currently MUEngineers is part of the CAS Team to provide structural engineering services for
continuing professional engineering services with the City of Lake Worth. In addition, MUEngineers
recently completed for CAS a seawall design for Torry Island Camp grounds in the City of Belle Glade.
MUEngineers, Inc. is a Certified CSE firm with Broward County and will be providing the structural
engineering needs for the duration of this contract.
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
Craig A. Smith & Associates, Inc.
Engineers • Surveyors • Subsurface Utility Engineering
30 Subsurface Imaging • Utility Coordination
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
ARCHITECT -ENGINEER QUALIFICATIONS
PART 1-CONTRACT-SPECIFIC QU ALIFICATIONS
1. TITLE AND LOCATION (City and State)
REQUEST FOR QUALIFICATIONS RFQ 20-07-01
CONTINUING PROFESSIONAL CONSUL TING SERVICES
CITY OF SU NNY ISLES BEACH, FLO RIDA . . . 3. SOLICITATION OR PROJECT NUMBER
I I • I I I I
B.ARCHITECT-ENGINEER POINT OF CONTACT
4. NAME AND TITLE
Stephen C. Smith, P.E., President/CEO
5. NAME OF FIRM
Craig A. Smith & Associates, Inc.
a: 9.FIRM NAMEw >za: ' I--, a: < 0..
Craig A. Smith &
X Associates, Inc.
a
CHECK IF BRANCH OFFICE
Smith Engineering X Consultants, Inc. b
CHECK IF BRANCH OFFICE
Bermello Ajamil & X
C Partners
HECK IF BRANCH OFFICE
X RADISE International, LC
HECK IF BRANCH OFFICE
e MU Engineers, Inc X
[]CHECK IF BRANCH OFFICE
■
8. E-MAIL ADDRESS
ssmith@craigasmith.com
10.ADDRESS 11.ROLE IN THIS
CONTRACT
21045 Commercial Trail PRIME
Boca Raton, FL 33486
2161 Palm Beach Lakes SUBCONSULTANT
Boulevard, Suite 312
West Palm Beach, FL 33409
Electrical Engineering
2601 S. Bayshore Drive, SUBCONSUL TANT
Suite1000 Environmental
Miami, FL 33133 Engineering & Public
Outreach
10486 NW 31 st Terrace SUBCON SULTANT-
Doral, FL 33172 Geotechnical I CEI
Services
3440 NE 12th Ave. SUBCON SULTANT-
Oakland Park, FL 33334 Structural Eng ineering
D.ORGANIZATIONAL CHART OF PROPOSED TEAM X (Attached)
E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person)
12.NAME 13.ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE
Stephen C. Smith, P.E. Project Director/Contract Manager a.TOTAL b.WITH CURRENT
FIRM
34 32
15.FIRM NAME AND LOCATION (City and State)
Craig A. Smith and Associates, Inc.State of Florida Boca Raton, Florida Boatd of Pr°.!!!!:!al Enaifl«,.
,-....,,C.., ..... ,P..11. /i,.•,
._....., ............. �--a..-.m.�,_ a...,_..,.,-.:, ,..a.u..""" -�-· -
16.EDUCATION (DEGREE AND SPECIALIZATION)
Bachelor of Science, Civil Engineering, 1988
17.CURRENTLY PROFESSIONAL
REGISTRATION (STATE AND
DISCIPLINE)Auburn University, Auburn, Alabama
Bachelor of Science, Building Construction, 1986
Auburn University, Auburn Alabama
Professional Engineering
State of Florida
License No. 48914
18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organization, Training, Awards, etc.)
a.
19.RELEVANT PROJECTS
(1)TITLE AND LOCATION (City and State)
Consulting Engineer, Town of Pembroke Park
Pembroke Park, Florida
2 YEAR COMPLETED
PROFESSIONAL CONSTRUCTION (if
SERVICES a licable
On oin
3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE x Check if pro·ect performed with current firm
Consulting Engineer as it relates to all water, wastewater, road and bridge issues, NPDES projects, site plan
review and agency coordination (FOOT, SFWMD, FDEP, etc.).
b.(1) TITLE AND LOCATION (City and State)
Consulting Engineer, City of Pompano Beach
Pompano Beach, Florida
2 YEAR COMPLETED
PROFESSIONAL CONSTRUCTION (if
SERVICES a licable
On oin
3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE x Check if project performed with current firm
Consulting Engineer as it relates to all water distribution, wastewater collection and conveyance, drainage and
roadway improvements, site plan review and agency coordination (FOOT, SFWMD, FDEP, etc.).
c.(1) TITLE AND LOCATION (City and State)2 YEAR COMPLETED
Palm Island and Hibiscus Island Stormwater and Roadway PROFESSIONAL CONSTRUCTION (if
Improvements SERVICES a licable
City of Miami Beach, Florida 2014 2019
3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE x Check if pro·ect performed with current firm
Capital Improvement Project where CAS was responsible for the drainage system, roadway design and
harmonization components of the CIP. Design incorporated engineering techniques to reduce future sea level
rises such as elevating the existing roadways, increasing the size of the drainage system, providing water quality,
installing three pump stations and backflow prevention devices to avoid extreme high tides for re-entering the
systems. Design cost were $404,154 and total project cost was $8,000,000.
d.
e.
f.
g.
h.
i.
(1)TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
City of Pompano Beach Non-Sewer Area C: Sanitary Sewer PROFESSIONAL CONSTRUCTION (if
Improvement SERVICES aoolicable)
Pompano Beach, Florida Ongoing Pending
(3)BRIEF DESCRIPTION (scooe, size, cost, etc.} and SPECIFIC ROLE X Check if project performed with current firm
The project consisted of the installation of a new wastewater collection system for 38 commercial/light industrial
properties which are currently on septic tanks. CAS conducted a Sanitary Sewer Service Study for the city to identify
design solutions. The recommendations from the study determined that the new system shall consist of one
wastewater lift station along with associated gravity sewer and force main lines and include connections to two (2)
existing city wastewater lift stations. Design fees for this project are $198,803. The construction cost estimate:
$1,800,000.
(1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
City of Sunny Isles Beach NE 174th Street Stormwater and PROFESSIONAL CONSTRUCTION (if
Pavement Improvements SERVICES aoolicable)
Sunny Isles, Florida 2014 2017
(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm
The project consists of reconstruction of both drainage and roadway along NE 174th Street for approximately 0.2
miles from Collins Avenue to North Bay Road. The design also includes a new drainage system that meets water
quality requirements, site demolition, road regrading, utility relocations, sidewalks, paver walkways, landscaping,
curbing, bike paths and parallel parking. Construction cost: $2,147,800 (Phase I).
(1} TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
Stormwater and Pump Station Improvements Phase IV PROFESSIONAL CO NSTRUCTION (if
Sweetwater, Florida SERVICES applicable)
2011 2013
(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm
Due to repetitive, historical flooding within the 138 acre residential area, Phase IV Stormwater Improvements for
the City of Sweetwater received substantial HMGP funding from FEMA. The projects consisted of 130 structures,
10,795 linear feet of drainage pipe ranging in size from 15-inch to 72-inch, 1,506 linear feet of 30-inch force main
and 2-triplex pumping stations (28 HP). Construction cost: $4,090,000.
(1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
Town of Golden Beach, Consulting Engineer PROFESSIONAL CONSTRUCTION (if
Golden Beach, Florida SERVICES aoolicable)
Ongoing N/A
(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm
Consulting Engineer as it relates to all water, stormwater, roadway engineering including beautification.
(1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
Town of Golden Beach CIP Phase II and Iv Stormwater PROFESSIONAL CONSTRUCTION (if
Collection System with Master Pump Stations SERVICES applicable)
Golden Beach, Florida 2008 2011
(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm
The project consisted of a stormwater master pump station, 14,500 linear feet of DIP drainage pipe and
stormwater force main ranging in size from 16-inch to 72-inch. Construction cost: $7,667,276.
(1)TITLE AND LOCATION (City and State)(2} YEAR COMPLETED
Town of Golden Beach Phase IV Stormwater Improvements PROFESSIONAL CONSTRUCTION (if
Golden Beach, Florida SERVICES aoolicable)
2004 2006
(3} BRIEF DESCRIPTION (scooe, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm
The project consisted of the installation of 1 ,775 linear feet of drainage pipe ranging in size from 15-inch to 72-
inch, 600 linear feet of force main, 32 drainage structures, a stormwater pump station, a bypass weir structure and
a water quality structure. Construction cost: $2,031,740.
j.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
City of Sweetwater Stormwater Pump Station Improvements PROFESSIONAL CONSTRUCTION (if
Phase 2B North and South SERVICES applicable)
Sweetwater, Florida 2006 2006
(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm
A 65-acre basin area located in the southern part of City know for historical repetitive flooding. Both projects
consisted of a stormwater collection system that converges into a duplex pumping station. Collectively, the
projects include 100 drainage structures 9,760 LF of drainage pipe ranging in size from 15 inch to 72 inch, 1,050
LF of 30 inch and 36 inch DIP FM and road and landscape restoration. Design and permitting fees cost was
$332,150. Construction cost for both portions of Phase 2: $4,043,110.
k.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
City of Sweetwater Stormwater and Pump Station PROFESSIONAL CONSTRUCTION (if
Improvement Phase I and Ill)SERVICES applicable)
Sweetwater, Florida 2000 2004
(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm
The project consisted of 115 structures, 7,400 linear feet of drainage pipe ranging in size from 15-inch to 72-inch,
7,325 linear feet of stormwater force main ranging in size from 24-inch to 48-inch, four duplex pump stations,
roadway restoration and complete reconstruction of 2,500 linear feet of NW 112th Avenue. Construction cost:
$7,058,530.
'
E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12.NAME 13.ROLE IN THIS CONTRACT
Project Engineer -Stormwater
14. YEARS EXPERIENCE
Orlando A. Rubio, P.E.
15.FIRM NAME AND LOCATION (City and State)
Craig A. Smith & Associates, Inc.
Boca Raton, Florida
16.EDUCATION (DEGREE AND SPECIALIZATION)
S.S. Civil Engineering, 198 8
University of Florida, Gainesville, FL
A.A., 1985
Miami Dade Community College, South Campus,
Miami, FL
a.TOTAL
32
b.WITH CURRENT
FIRM
20
17.CURRENT PROFESSIONAL REGISTRATION (STATE
AND DISCIPLINE)
Professional Engineer
State of Florida
License No. 48265
18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
Hydraulic Hydrologic Modeling -Streamline Technologies -ICPR
University of Florida -TREOO -HEC -RAS Modeling
19 RELEVANT PROJECTS
(1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
Village of El Portal PROFESSIONAL CONSTRUCTION (If El Jardin Stormwater Improvements SERVICES ADDlicable)
El Portal, Florida 2017 Pending
a (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed
with current firm
Project Manager & Design Engineer: Design, permitting, modeling, bidding, and construction management of a
$2.4 million stormwater retrofit project.
(1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
Sunshine Water Control District (SWCD)PROFESSIONAL CONSTRUCTION (If
West Outfall Canal Improvements SERVICES ADDlicable)
Coral Springs, Florida 2014 2019
b (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed
with current firm
Project Manager & Design Engineer: Conceptual hydraulic modeling of a 2-mile primary canal of the SWCD.
Phase 1 design, permitting, modeling, bidding, community outreach, and construction management of the
$3,000,000 oroiect.
(1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
Spring Lake Improvement District (SLID)PROFESSIONAL CONSTRUCTION (If
Stormwater Treatment Area SERVICES Aoo/icable)
Sebring, Florida 2014 2017
C (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with
current firm
Project Manager & Design Engineer: Obtained initial project funding from FDEP. Design, permitting, modeling,
bidding, and construction management of a $3,300,000 project. Report for FDEP.
( 1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
Phase IV Stormwater Improvements PROFESSIONAL CONSTRUCTION (If City of Sweetwater, Florida SERVICES ADDlicableJ
2010 2017
d (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with
current firm
Project Manager & Design Engineer: Design and permitting of stormwater retrofit project ($3.8M). Preparation of
construction plans, bid schedule, cost estimate, bidding assistance and engineering services for the ongoing
construction.
(1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
Golden Beach Stormwater Improvements PROFESSIONAL CONSTRUCTION (If
Golden Beach, Florida SERVICES Aon/icableJ
2008 2012
e (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with
current firm
Project Manager & Design Engineer: Design and permitting of a stormwater retrofit ($6.0 million). Prepared cost
estimated, bid schedule, provided bidding assistance and FEMA orant aoolication documentation.
(1)TITLE AND LOCATION (City and State)PROFESSIONAL CONSTRUCTION (If
East-West Conveyance Drainage Project SERVICES AoolicableJ
Okeechobee, Florida 2015-2017 NIA
f (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with
current firm
Project Manager & Design Engineer: As a prime component of the East-West Conveyance Drainage Project, CAS
was tasked with improving the hydraulic efficiency of the Whidden Ditch through canal improvements at strategic
locations in order to provide food protection for the area and reduce canal maintenance. The scope of work
included surveying of the project area including preparation of conveyance/maintenance easements for all
identified conveyances, a detailed stormwater modeling analysis, preparation of a conceptual plan with phasing
and a final engineering report. Total cost for survey, hydraulic analysis, conceptual design, and final engineering
report was $138,360. The project began in July 2015 and was completed on time in April 2017.
(1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
Oak Park Subdivision Stormwater Improvements PROFESSIONAL CONSTRUCTION (If
Okeechobee County, Florida SERVICES Aoolica ble J
2015 2016 g 3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with
current firm
Project Manager & Design Engineer: CAS was tasked to design and construct stormwater improvements for the
Oak Park Residential Subdivision entailing approximately 90 homes in order to improve local drainage. Total
design costs for the project improvements including construction manageme nt was $166,938. The initial
construction cost was $914,589 with County requested change orders totaling $1,353,913 for additional
stormwater improvements for a total construction cost of $2,268,502. The project began in April 9, 2015 and was
completed in March 17, 2016 without liquidated damages.
(1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
Airport Ditch Improvements PROFESSIONAL CONSTRUCTION (If
Okeechobee County, Florida SERVICES Aon/icable)
2014 2014 h 3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with
current firm
Project Manager & Design Engineer: The Airport Ditch Improvements Project for Okeechobee County consists of
bank stabilization, re-shaping, sodding of canal washouts, easement and right-of-way issues. This NRCS project
was a 75/25 match that involved debris removal from rip-rap rock bank stabilization to prevent erosion due to
Tropical Storm Isaac. Total design costs for the project was $25,000. Total construction cost was $500,000. The
project began in January 2014 and was completed in March 2014 on time and without liquidated damages.
(1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
Southwest Drainage Improvements PROFESSIONAL CONSTR UCTION (If Okeechobee County, Florida SERVICES Aoolicable)
2010 2013
i (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed
with current firm
Project Manager & Design Engineer: The Southwest Drainage Project for Okeechobee County is a HMGP/FEMA
project that includes stormwater improvements within three (3) rights-of-way in Okeechobee County and benefited
a 170-acre urbanized area of the County including improved access to a hurricane shelter. The stormwater
improvements included the installation of stormwater gravity collection systems with water quality treatment
components incorporated into the project design. This project supported and augmented the protection of the
Northern Everglades Ecosystem, the Lake Okeechobee Protection Act, and accomplished objectives of the South
Florida Water Management District. This project was 100% grant funded. Total design costs including
construction management for the project were $348,870. Total construction cost was $1,392,670. The project
beoan in June 2010 and was completed in Januarv 2013 without liquidated damaoes.
(1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
Palm Island & Hibiscus Stormwater and Roadway PROFESSIONAL CONSTRUCTION (If
Improvements SERVICES Aoolicable)
j City of Miami Beach, Florida 2014 2019
3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
current firm
X Check if project performed with
Project Manager & Design Engineer: Capital Improvement Project where CAS was responsible for the drainage
system, roadway design and harmonization components of the CIP. Design incorporated engineering techniques
to reduce future sea level rises such as elevating the existing roadways, increasing the size of the drainage
system, providing water quality, installing three pump stations and backflow prevention devices to avoid extreme
high tides for re-entering the systems. Design cost were $404,154 and total project cost was $8,000,000.
Title and location (City and State) I (2)YEAR COMPLETED
Ranch Lake Estates Southwest Improvements
City of Moore Haven, Florida PROFESSIONAL CONSTRUCTION (If SERVICES Aoolicable)
2010 2015
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND X Check if project performed with current
SPECIFIC ROLE firm
k Project Manager & design Engineer: The Ranch Lakes Estates Improvements Project for the City of Moore Haven
consisted of the construction of a gravity stormwater drainage system along with two major stormwater pump
stations including force mains and canal dredging. Construction included the installation of 7,103 linear feet of
HOPE drainage pipe ranging in diameter from 15-inch to 48-inch, 1,044 linear feet of force main, 76 drainage
structures, and two stormwater pump station with two pumps. Total construction cost was $2,031 ,000. The
project began in January 2010 and was completed in July 2015 without liquidated damages. At the owner's
request, pumps were redesigned to operate under tractor power during emergency conditions in lieu of traditional
standby generator.
E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person)
12.NAME 13.ROLE IN THIS CONTRACT
Project Engineer -Water & Sewer
14.YEARS EXPERIENCE
Greg Giarratana a.TOTAL b.WITH CURRENT
FIRM
43 22
15.FIRM NAME AND LOCATION (City and State)
Craig A Smith and Associates, Inc.
Boca Raton, Florida
16.EDUCATION (DEGREE AND SPECIALIZATION)17.CURRENTLY PROFESSIONAL
REGISTRATION (STATE AND DISCIPLINE)B.S. Civil/Environmental Engineering, 1977, Rogers Williams
University, Bristol, Rhode Island
18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organization, Training, Awards, etc.)
ASCE, WPCF and AWWA
a.
b.
19.RELEVANT PROJECTS
(1)TITLE AND LOCATION (City and State)2 YEAR COMPLETED
Wauchula Hills Water and Sanitary Sewer Improvement PROFESSIONAL CONSTRUCTION (if
Project -Phase VI SERVICES a licable Wauchula, Florida 2017
3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE x Check if pro·ect erformed with current firm
Project manager: Professional engineering services for the installation of approximately 1,325 linear feet of 6" water
main, 6,460 linear feet of 8" water main, and 4,862 linear feet of 1 O" water main including roadway/driveway
restoration including fire hydrants and valves, and connections to existing 4" and 12" water mains. This project is
funded through a multi-year special legislative appropriation. The project design cost, including construction
management is $100,426. The project construction cost is $1,826,130.
(1)TITLE AND LOCATION (City and State)
Spring Lake Improvement District
US Highway 98 / Country Road 700 Wastewater Force Main
System Expansion
Sebrin , Florida
2 YEAR COMPLETED
PROFESSIONAL CONSTRUCTION (if
SERVICES a licable
2019 Pending
3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE X Check if pro·ect performed with current firm
Project Manager: Design, survey, utility locates, geotechnical investigation, grant funding, permitting and
construction for the installation of approximately 12,400 linear feet of wastewater forcemain along US Highway
98/County Road 700 to expand the district's new wastewater treatment plant service area for commercial
development along the corridor. This project is 100% grant funded (legislative appropriation). Design cost
including construction management is $184,777. Estimated construction cost is $9 12,000.
C.(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
City-County Public Works Authority PROFESSIONAL CONSTRUCTION (if Gr avity Sewer Expansion N, 0, S Avenue and 4th Street SERVICES aoolicable) Moore Haven, Florida 2018 2020
(3)BRIEF DESCRIPTION (scooe, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm
Project Manager: Design, permitting, surveying and construction for the expansion of a gravity sewer system along
Avenue N, 0, S and 4th street from the 8 th street canal to Riverside Drive consisting of approximately 4,428 linear
feet of 8" sanitary sewer collection mains including manholes, service laterals and connection to the existing sanitary
sewer gravity and wastewater lift station system. The total design costs for the project are $142,093 with
construction costs totaling $749,755.
d.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
Spring Lake Improvement District PROFESSIONAL CONSTRUC TION (if Water Main Extension -Madrid Drive & US98 SERVICES aoolicable) Sebring, Florida 2017 2018
(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm
Project manager: Planning design, computer modeling, permitting and construction management for the
installation of approximately 500 linear feet of a 1 O" water main and 50 linear feet of 8" water main with all
appurtenances along Madrid Drive. The project included a connection to an existing 6" water main at the
intersection of Madrid Drive and Holly Lane and approximately 200 linear feet of 1 O" HOPE horizontal directional
drill under the south right-of-way line of US 98 at the intersection of Revson Avenue. Total design cost was
$12,450 and total construction cost was $76,238.
e. {1) TITLE AND LOCATION (City and State) (2)YEAR COMPLETED
Moore Haven Water System Improvements Phase 1 PROFESSIONAL CONSTRUCTION (if Moore Haven, Florida SERVICES applicable)
2008 2012
(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm
Project Manager: Planning, design, computer modeling, permitting and construction management of this project.
The City of Moore Haven Phase I Water Treatment Plant Expansion was designed to allow an increase in plant
productivity of an additional 0.50 MGD and to provide service to the proposed industrial park at US 27 and SR 78.
Scope of work included a 500,000 GPO water treatment ultra filtration (Zenon) plant, a 300,000 gallon ground
storage tank with booster pump station and re-chlorination facility, approximately 3.5 miles of 12-inch distri bution
main, and two high service pumps connecting the existing downtown storage tank to the water tank site. The
project was fully funded by the US Department of Agriculture (USDA). The design costs for the project were
$325,000 with a total construction cost of $3,543,031.
f. (1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
Miccosukee Water Distribution System Improvements PROFESSIONAL CONSTRUCTION (if Miami, Florida SERVICES applicable)
2011 2015
(3)BRIEF DESCRIPTION (scooe, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm
The water system improvements for the Miccosukee Tribe of Indians of Florida included expansion of the tribe's
water distribution system including 15,000 feet of 12-inch water mains and rehabilitation of existing elevated storage
tank piping. Total design costs for the project were $516,000. Total construction costs were $2,580,000.
g.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
Palm Beach County Lake Region Pipeline PROFESSIONAL CONSTRUCTION (if
Palm Beach, Florida SERVICES applicable)
2005 2006
(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm
Project Manager: Design plans and contract documents, hydraulic modeling and permitting for a 20 mile lake
regional potable water pipeline. Project consisted of designing approximately 91,200 feet of water distribution
main to serve the cities of Pahokee, Belle Glade and South Bay from the central lake region water treatment plant
located on Hooker Highway in Belle Glade. Design included raw water piping from 7 potable water wells to the
county reverse osmosis water treatment plant. Raw water mains ranged from 12" diameter at each well to 30"
diameter entering the water treatment plant. The water treatment plant discharge pipe line consisted of 30"
diameter down to 1" diameter mains when tied into the cities of Pahokee and South Bay. The total pipeline
construction cost was approximately $10,000,000.
h.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
Hardee County Bowling Green Water Line Replacement PROFESSIONAL CONSTRUCTION (if
Moore Haven, Florida SERVICES aoolicable)
2004 2005
(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm
Project Manager: Design, hydraulic modeling, surveying, bidding, construction management of this $500,000
pipeline project consisting of 4,000 feet of 8" diameter water mains.
i.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
ITID Water Main Extension PROFESSIONAL CONSTRUCTION (if
West Palm Beach, Florida SERVICES aoolicable)
2003 2004
(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm
Project Manager: Design, hydraulic modeling, permitting, and construction management of a $1.5M nine mile
long, 12" diameter water main to extend West Palm Beach utilities water service to western Indian Trial
Improvement District.
j.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
Avenue R Stormwater Improvements PROFESSIONAL CONSTRUCTION (if
Moore Haven, Florida SERVICES aoolicable)
2016 2018
(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm
Project Manager: The City of Moore Haven continues to address flooding and water quality issues by improving
its existing conveyance systems with upgrades to existing swales, box culverts, flow efficiency devices, drainage
apparatuses and pump stations. This phase of stormwater improvements involved the relocation of existing utilities
and the installation of 1,200-LF of plastic swale liner (1/4 section of 12-inch ID smooth inner wall perforated black
P.E. pipe), 350-LF of PVC culverts, ten (10) concrete headwalls, one (1) drainage structure, 4,000-SY of SOD and
the regarding of 4,000-SY of swale. This project was funded using State grants secured with the help of CAS and
CAS Governmental Services. The total design and construction management costs were $94,290 with the
construction costs totaling to $393,304; completed within budget and on time in May of 2018.
k.(1) TIT LE AND LOCATION (City and State)(2)YEAR COMPLETED
Wauchula Hills Water and Sanitary Sewer Improvements -PROFESSIONAL CONSTRUCTION (if
Phase IV SERVICES aoolicable)
Wauchula Florida 2016 2017
(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm
Project Manager: CAS provided professional engineering services for the installation of the water and sanitary
sewer improvements included approximately 6, 125 linear feet of 8" water main and 5,277 linear feet of 8" gravity
sanitary sewer including connection to 51 private residences and the decommissioning of septic tanks and potable
water wells. This project was funded through a multi-year special legislative appropriation. The project design
costs, including construction management, were $189,628 and project construction costs totaled $1,249,013.
Project construction began in March 2017 and was completed in October 2017 on schedule and under budget by
$417,948.
I. (1)TITLE AND LOCATION (City and State)(2} YEAR COMPLETED
Wauchula Hills Water and Sanitary Sewer Improvements -PROFESSIONAL CONSTRUCTION (if Phase V SERVICES aoolicable) Wauchula, Florida 2017 Onaoing
(3)BRIEF DESCRIPTION (scooe, size, cost, etc.} and SPECIFIC ROLE X Check if project performed with current firm
Project Manager: CAS is providing professional engineering services for the installation of approximately 6,885
linear feet of 8" water main including fire hydrants, one duplex submersible wastewater lift station, approximately
1,500 linear feet of 4" force main and approximately 6,750 linear feet of 8" gravity sanitary sewer. This project is
funded through a multi-year special legislative appropriation. The project design is currently 95% complete. The
project design costs, including construction management, are $121,453. Construction began on October 15, 2019
and is on-going (currently approximately 40% complete). The project construction cost is $2,068,956.
E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person)
12.NAME
Keith Schriner
13.ROLE IN THIS CONTRACT
Project/Field Engineer
14.YEARS EXPERIENCE
a.TOT AL b.WITH CURRENT
FIRM 4 4
15.FIRM NAME AND LOCATION (City and State)
Craig A. Smith and Associates, Inc.
Boca Raton, Florida
16.EDUCATION (DEGREE AND SPECIALIZATION)
Bachelor of Science, Civil Engineering, 2013
University of Central Florida, Orlando, Florida
17.CURRENTLY PROFESSIONAL
REGISTRATION (STATE AND DISCIPLINE)
18.OTHER PROFESSIONAL QUALIFICATIONS Publications, Or anization, Trainin , Awards, etc.
a.
19.RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State)
2018 Watermain Improvements -Phase II
Margate, Florida
2 YEAR COMPLETED
PROFESSIONAL CONSTRUCTION (if
SERVICES a licable
2019
3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE x Check if pro·ect performed with current firm
Project Engineer: Responsible for the design, preparation of construction plans and contract documents,
permitting, bidding, construction management and limited construction observation through project close out/start
up services for the replacement of 2" galvanized steel water mains with 6" DIP water mains at fifteen (15) different
locations throughout the city's service area (approximately 12,000 LF) including GPR utility locates, test hole
investigations, water service line placements, ACP removal, fire hydrant replacement, fire hydrant spacing
analysis and valve shutdown plan. Design cost $212,280. Construction cost $1,497.921.
b.(1) TITLE AND LOCATION (City and State)2 YEAR COMPLETED
Spring Lake Improvement District -WWTP and wastewater PROFESSIONAL CONSTRUCTION (if
System Improvements SERVICES a licable
Sebring, Florida 2017 2019
3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE X Check if pro·ect performed with current firm
Project Engineer: Responsible for the design for the construction of an 80,000 GPO extended aeration activated
sludge wastewater treatment plan with absorption bed effluent disposal system including a sanitary sewer lift
station and an 8" / 1 O" forcemain to the new WWTP site. Project includes survey, utility locates, geotechnical
investigation, environmental assessment permitting, contract document development, bidding assistance,
construction management and inspection through project closeout (project is 100% SRF funded). Design and
construction management cost $450,510. Construction cost is $2,8000,000.
c.(1) TITLE AND LOCATION (City and State)
SW 28th Street and 3 rd Terrace Roadway
Okeechobee County, Florida
2 YEAR COMPLETED
PROFESSIONAL CONS TRUCTION (if
SERVICES a licable
2016 2018
3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE x Check if pro·ect performed with current firm
Project Engineer: This particular area of Okeechobee experienced noticeable roadway settlement at fourteen
locations along an existing gravity storm system. Custom construction details were produced to clearly define the
scope for each trench restoration area. A valley gutter was also installed in swales to allow runoff to flow into
existing inlets and keep water from ponding on driveways. Construction cost $400,000.
d.(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
Wauchula Hills Phase 4.0 Water and Sewer Improvements PROFESSIONAL CONSTRUCTION (if Hardee County, Florida SERVICES aoolicable)
2016 2017
(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm
Project Engineer: Wauchula Hills is a very old neighborhood with residences on both well and septic tanks,
eventually resulting in high levels of groundwater contamination. The scope of this project includes designing a
gravity sewer collection system to tie into an exiting system and expanding on an existing water main system to
service the rest of the neighborhood. Construction cost is $1,249,012.
e. (1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
Avenue L, M, Mand 4th Street Gravity Sanitary Sewer,PROFESSIONAL CONSTRUCTION (if Forcemain and Lift Station Improvements SERVICES applicable)
2015 2016
(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm
Project Engineer: Construction of duplex submersible lift station with an 8 foot diameter wet well and approx .. 350
LF of 6" forcemain along with 6,344 LF of associated 8" and 1 O" gravity sewer line. Services included survey,
design, permitting, preparation of construction plans and contract documents, bidding and construction
management. Construction cost is $1,286,627.
•
E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key pe, son.)
12.NAME 13.ROLE IN THIS CONTRACT
Engi neering -Project Engineer
14.YEARS EXP ERIENCE
Al Caruso, E.I.a.TOTAL
28
b.WITH CURRENT
FIRM
21
15.FIRM NAME AND LOCATION (City and State)
Craig A. Smith & Associates, Inc.
Boca Raton, Florida
16.EDUCATION (DEGREE AND SPECIALIZATION)
Associates Degree in Engineering, 1978
17.CURRENT PROFESSIONAL REGISTRATION (STATE AND
DISCIPLINE)
Technology Middlesex County College, New Jersey
18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
19.RELEVANT PROJECTS
1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
Wastewater Pump Station No. 3 & Gravity Sewer PROFESSIONAL CONSTRUCTION (If
Bal Harbour, Florida SERVICES Applicable)
2017 2018
a 3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
k:urrent firm
X Check if project performed with
Project Designer: Construction of new triplex submersible pump station with 12-foot diameter wet well, control panel,
automatic transfer switch receptacle, on-site emergency generator, electrical upgrades and all associated appurtenances and
approximately 1,350 linear feet of 18-inch gravity sewer lines to pump station. Services include survey, utility locates, design,
permitting, preparation of construction plans and contract documents, bidding, and construction management. (Responsible
for the desian of the aravitv sewer lines.} Construction cost $2,968,730
1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
Sewer Force Main Replacement PROFESSIONAL CONSTRUCTION (If
Margate, Florida SERVICES Aoolicab/el
2013 2014
3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current
Irm
Project Designer: Replacement of an existing 12-inch ACP force main with a new, upsized sewer force main. The work
included the installation of approximately 5,060 LF of DIP force main ranging in size from 6-inch to 20-inch, 140 LF of
encased jack and bored pipe under State Road 7, 950 LF of directional drilled HOPE pipe under an existing canal, connection
to an existing lift station, abandonment of the existing force main, and road and swale restoration. The project was installed
from the City's wastewater treatment plant to an existina force main tie-in on State Road 7. Project cost $1,449,900
1)TITLE AND LOCATION (City and State)(2} YEAR COMPLETED
Collins Avenue 12" Water Main Replacement PROFESSIONAL CONSTRUCTION (If
Bal Harbour, Florida SERVICES Aoolicable)
2011 2013
C 3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with
current firm
Project Designer: Responsible for design, permitting, contract document development, bidding services, construction
management/inspection and certification through project close-out for installation of 1 ,800 linear feet of horizontal directionally
drilled 12" HOPE water main and 680 linear feet of 12" DIP water main including five (5) fire hydrants and nine (9) tie-in
connections to existinQ water mains. Construction cost $558,590
I i
'
1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED I
Bal Harbour Force Main Replacement PROFESSIONAL CONSTRUCTION (If
Bal Harbour, Florida SERVICES Applicable) :
2010 2011
d 3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
urrent firm
X Check if project performed with
Project Designer: Planning, design, permitting, preparation of construction plans, bidding and construction management of
12,000 linear feet of 16" force main trunk line to service the entire Village to pump all raw sewage to Miami Beach. Services
included survey, utility locates, design, permitting, cost estimates, bidding, construction management, community outreach
and survev as-builts. Proiect cost $842,570
1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED [
Capital Improvements Project-Phase Il l-IV PROFESSIONAL CONSTRUCTION (If I
Golden Beach, Florida SERVICES ADDlicable)
2010 2011
e 3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with
1,,urrent firm
Project Designer: Construction of submersible stormwater master pump station and approximately 14 ,500 linear feet of
I drainage pipe and force main. Project cost $7,667,276
1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
Palm & Hibiscus Islands Stormwater & Roadway Improvements PROFESSIONAL CONSTRUCTION (If
Miami Beach, Florida SERVICES Aoolicablel
2014 2018
3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current
�rm
Design engineering for a capital improvement project on Hibiscus Island including drainage system, buried utilities, roadway
design and harmonization to existing residences. Construction costs total $3.7 million.
E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person)
12.NAME
Frank Vilar, P.E.
13.ROLE IN THIS CONTRACT
Project Engineer -Stormwater
14.YEARS EXPERIENCE
a.TOTAL b.WITH CURRENT
FIRM
25 5
15.FIRM NAME AND LOCATION (City and State)
Craig A. Smith and Associates, Inc.
Boca Raton, Florida
16.EDUCATION (DEGREE AND SPECIALIZATION)17.CURRENTLY PROFESSIONAL
REGISTRATION (STATE AND DISCIPLINE)
Professional Engineer
M.S. Environmental Engin eering, Florida International University
B.S. Civil Engineering, Florida International UniversityA.A., Miami-Dade College State of FloridaLicense No. 55459
18.OTHER PROFESSIONAL QUALIFICATIONS Publications, Or anization, Trainin , Awards, etc.
19.RELEVANT PROJECTS
a.(1) TITLE AND LOCATION (City and State)2 YEAR COMPLETED
Lake Osborne Estates Water Main Improvements
Lake Worth, Florida
PROFESSIONAL CONSTRUCTION (if
SERVICES a licable
On oin
(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with
current firm
Engineering design for proposed Phase I of Lake Osborne Estates serving 228 residences. Appr oximately 16,400
LF of water main installation ranging in size from 4" to 8" is proposed, including relocation of backyard water
services to the front of properties. Design costs total $183,747 and construction costs total $2,618,649.
b.(1) TITLE AND LOCATION (City and State)2 YEAR COMPLETED
C.
Non Sewer Area C: Sanitary Sewer Improvements
Pompano Beach, Florida
PROFESSIONAL CONSTRUCTION (if
SERVICES a licable
On oin
(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with
current firm
CAS is providing engineering design services for the installation of a new wastewater collection system to provide
sanitary sewer service to the city's Non-Sewer Area C service area. The project area consists of 38
commercial/light industrial properties which are currently on septic tanks. CAS conducted a Sanitary Sewer
Service Study for the city to identify design solutions. The recommendations from the study deter mined that the
new system shall consist of one wastewater lift station along with associated gravity sewer and force main lines
and include connections to two (2) existing city wastewater lift stations. Design fees for this project are $198,803.
The construction cost estimate is $1,800,000.
2 YEAR COMPLETED (1)TITLE AND LOCATION (City and State)
SW 2 nd Stre et Drainage Improvements
Pompano Beach, Florida
PROFESSIONAL CONSTRUCTION (if
(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE
current firm
SERVICES a licable
X Check if project perf ormed with
Engineering design for proposed drainage improvements of SW 2 nd Street, SW 1st Avenue and SW 1st Terrace.
Design costs total $143,833 and estimated construction costs total $750,000.
d.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
NW 16th Lane Drainage Improvements PROFESSIONAL CONSTRUCTION (if
Pompano Beach, Florida SERVICES aoolicable)
Ongoing Onqoina
(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with
current firm
providing engineering design services including route survey and utility locates for the drainage improvements along
the NW 16th Lane area which includes the road right-of-way and 16 property lots encompassing approximately a
total of 10 acres. The project area is composed of primarily light industrial and warehouse properties. CAS will
perform a drainage analysis to determine the feasibility of proposed site improvements for conf ormance with established
drainage criteria. The drainage analysis will include pipe sizing analysis, flood routing design and will incorporate water
quality treatment measures in the design in accordance with the City's Stormwater Master Plan. Design elements
include drainage pipes, includes paving, grading, drainage and stormwater pump station improvements. Design fees
for this project are $161,136. The construction cost estimate is $900,000.
e.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
US 1 and NE 14th Street Drainage Improvements PROFESSIONAL CONSTRUCTION (if
Pompano Beach, Florida SERVICES aoolicable)
Onqoina Onaoina
(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with
current firm
CAS is providing engineering design services for the drainage improvements for the US-1 and NE 14th Street
Causeway area encompassing a neighborhood area of approximately 60 acres. The project area is composed of
primarily residential homes with some commerci al develo pment within the project limits. CAS was directed to
evaluate options available for providing drainage improvements for the area with the goal of addressing flooding
and water quality treatment to the greatest extent practical. The proposed alternatives will examine the feasibility
of exfiltration trench, improved pipe conveyance and swale improvements where feasible. Proposed improvements
will use existing city-owned outfall systems within the project area where feasible and evaluate upsizing these
systems. Design fees for this project are $196,069. The construction cost estimate is $1,626,000
f.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
Glades Roadway and Drainage Improvements, Bank of PROFESSIONAL CONSTRUCTION (if
America SERVICES applicable)
Boca Raton, Florida 2016 2019
(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with
current firm
Redevelopment of a 4.7 acre existing bank site. Services provided included engineering design of a 200 linear
foot water main relocation, paving, grading and drainage improvements. Permitting, construction management
and inspection services were also provided. Construction costs for the civil related improvements were $575,000.
E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person)
12.NAME 13.ROLE IN THIS CONTRACT
Vice President -Surveying
14.YEARS EXPERIENCE
Robert D. Keener,
PSM
a.TOT AL b.WITH CURRENT
FIRM
42 25
15.FIRM NAME AND LOCATION (City and State)
Craig A. Smith and Associates, Inc.
-_,___.._ ,_ .. ·--------.--... t--.. -
.
,
.
_
.
.
.
.
.
.
.
.
Boca Raton, Florida
� ..............
16.EDUCATION (DEGREE AND SPECIALIZATION)
Associate of Arts Degree
17.CURRENTLY PROFESSIONAL
REGISTRATION (STATE AND DISCIPLINE)
Florida Land SurveyorContinuing Education in Land Surveying
Re istration No, 4846
19.RELEVANT PROJECTS
a.(1) TITLE AND LOCATION (City and State)2 YEAR COMPLETED
b.
C.
East-West Conveyance Drainage Project (Whidden Ditch)
Okeechobee County, Florida
PROFESSIONAL CONSTRUCTION (if
SERVICES a licable
2015-2017 N/A
3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE x Check if pro·ect performed with current firm
As a prime component of the east-west conveyance drainage project, CAS was tasked with improving the hydraulic
efficiency of the Whidden Ditch through canal improvements at strategic locations in order to provide food protection
for the area and reduce canal maintenance. The scope of work included surveying of the project area including
preparation of conveyance/maintenance easements for all identified conveyances, a detailed stormwater modeling
analysis, preparation of a conceptual plan with phasing and a final engineering report. Total cost for survey,
h draulic anal sis, conce tual desi n and final en ineerin re ort was $138,360.
(1) TITLE AND LOCATION (City and State) 2 YEAR COMPLETED
City of Pompano Beach PROFESSIONAL CONSTRUCTION (if
SW 2nd Street Drainage Improvements SERVICES a licable
Pompano Beach, Florida 2018
3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE x Check if pro·ect performed with current firm
Route survey including all above ground features within existing right-of-way and off-site surveying of critical
drainage structures. Scope of work includes 2D GPR utility locates within the project corridor (SW 2nd street
between dixie highway and cypress road, SW 1st Avenue between SW 2nd street and Atlantic Boulevard, and SW
1st terrace & court between SW 2nd street and south cypress road ).
COST: $22,300
(1)TITLE AND LOCATION (City and State)
City of Lake Worth Beach
Lake Osborne Estates Water Main Replacement and
Expansion Phase 1
Lake Worth, Florida
2 YEAR COMPLETED
PROFESSIONAL CONSTRUCTION (if
SERVICES a licable
2018 & 2020 Ongoing
3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE X Check if ro·ect performed with current firm
Route survey along residential streets throughout community for 228 properties, including all visible
improvements, above and below ground utilities, drainage structures as well as trees and landscaped areas 1 O
feet outside right of way, property lines, utility easements and subsurface utility engineering (utility locates).
Owner initiated change order in the amount of $17,990 for additional scope of work to include surveying and utility
locates for approximately 40 additional properties as part of the Phase 1 expansion.
COST: $127.153
d.(1) TITLE AND LOCATION (City and State)(2} YEAR COMPLETED
City of Delray Beach PROFESS IONAL CONSTRUCTION (if
Lowson Boulevard Improvements SERVICES applicable)
Delray Beach, Florida 2019 N/A
(3)BRIEF DESCRIPTION (scope, size, cost, etc.} and SPECIFIC ROLE X Check if project performed with current firm
CAS performed survey and subsurface utility engineering as a subconsultant to Kimley-Horn & Associates, Inc. for
the City of Delray Beach. The scope of work included a survey of all above ground visible improvements and
utilities within the right-of-way of Lowson Boulevard (SW 10th Street) and 10 feet beyond the right-of-way line from
the east right-of-way of Congress Avenue to the intersection of SE 6th Avenue. In addition, rims, pipe invert
elevations, sizes and pipe materials were acquired for all existing drainage structures within the project limits.
Subsurface utility engineering included soft digs at fifty (50) designated locations to verify depths , sizes and
materials of conflicting buried utilities. Cost $58,550
e.(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
Palm Beach County Water Utilities Department PROFESSIONAL CONSTRUCTION (if
Lyons Road Forcemain Replacement -Phase II SERVICES aoolicable)
2018 N/A
(3)BRIEF DESCRIPTION (scope, size, cost, etc.} and SPECIFIC ROLE X Check if project performed with current firm
Route survey and utility locates within existing right-of-way.
COST: $12,750.
f.(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
City of Margate 2018 Water Main Improvements PROFESSIONAL CONSTRUCTION (if
Margate, Florida SERVICES applicable)
2016 Onooino
(3)BRIEF DESCRIPTION (scope, size, cost, etc.} and SPECIFIC ROLE X Check if project performed with current firm
Route survey including location of all above ground features and visible improvements within the existing right-of-
way. Establish survey baseline, cross sections and vacuum excavation test holes to verify location of buried
utilities.
COST: $46,250.
g.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
Seacoast Utility Authority -Northlake Boulevard/US1 Water PROFESSIONAL CONSTRUCTION (if
and Sewer force Main Replacement SERVICES aoolicable)
Jupiter , Florida 2018 N/A
(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPEC IFIC ROLE X Check if project performed with current firm
Route survey along Northlake Boulevard and US-1 (approx. 2.8 miles) including identification of right-or-way,
property lines, above ground improvements, utility easements, tee survey, cross sections and subsu rface utility
engineering (utility locates).
Cost $203,325.
h.(1) TITLE AND LOCATION (City and State)(2} YEAR COMPLETED
Village of Bal Harbour PROFESSIONAL CONSTRUCTION (if
Bal Harbour, Florida SERVICES applicable}
2016 N/A
(3)BRIEF DESCRIPTION (scooe, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm
Various survey mapping and construction projects for the expansion and/ or rehabilitation of utilities, acting as the
village engineers. Projects include Collins Ave. (SR A-1-A) from 73rd street to 96th street and 96 th street to the
Haulover cut (approximately three (3) miles). Also included is ongoing surveying as needed and a major route
survey for the rehabilitation of the Vi llage of Bal Harbour utility system and roadways. (approximately three (3)
miles).
Cost: $22,000.
i.
j.
k.
I.
m.
(1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
Palm Beach Water Utilities Department PROFESSIO NAL CONSTRUC TION (if
Lake Region WTP No. 11 Utility Locates SERVICES aoolicable) Palm Beach County, Florida 2015 N/A
(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm
Survey and subsurface utility engineering to locate existing utilities at water treatment plant for record drawing
update. Utility locates included establishing benchmarks, horizontal control, depth, size, material and utility type.
COST: $74,928.
(1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
Brickell Citi Center PROFESSIONAL CONSTRUC TION (if
Miami Dade County, Florida SERVICES aoolicable)
2012 N/A
(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm
Surveying mapped above and below ground utilities based on radar tomography and traditional sue methods on
site and off site. The project is in downtown Miami between Miami Ave. And 151 on 6th, 7th and 8th streets.
COST: $110,000.
(1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
Town of Golden Beach PROFESSIONAL CONSTRUCT ION (if
Golden Beach, Florida SERVICES applicable)
2012 NIA
(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm
Surveying within the rights of ways of golden beach drive, out to the three islands and along Collins Ave. (SR A-1-
A)for drainage improvements due to major flooding issues; total roadway reconstruction; undergrounding of all
utilities; water main replacement and miscellaneous surveys, as needed. Route spanned approximately three (3)
miles.
COST: $1,000,000
(1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
Interstate 1595 PROFESSIONAL CONSTRUCTION (if
Broward County, Florida SERVICES aoolicable)
2011 NIA
(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm
Surveying mapped above and below ground utilities based on radar tomography and traditional sue methods on
site and off site. Specific areas were requested by the project engineer based on anticipated utility conflicts.
COST: $1,100,000.
(1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
Town of Golden Beach Boundary Survey PROFESSIONAL CONSTRUCTION (if
Golden Beach, Florida SERVICES applicable)
2011 N/A
(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm
CAS Survey was tasked with providing the Map of Topographic Survey/Route Surveys within the corridors
specified. All visible improvements, as well as above and below ground utilities and drainage were identified.
Additionally, all trees (4" or greater) and landscaped areas to 10 feet outside each right of way line were located
and shown. Utility test hole locations included.
Cost: $8, 180
n.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
City of Sweetwater Stormwater Pump Station Improvements PROFESSIONAL CONSTRUCTION (if
-Phase IV SERVICES aoolicable)
Sweetwater, Florida 2011 2014
(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm
Due to repetitive, historical flooding within the 138 acre residential area, Phase IV Stormwater Improvements for
the City of Sweetwater received substantial HMGP funding from FEMA. The projects consisted of 130 structures,
10,795 linear feet of drainage pipe ranging in size from 15-inch to 72-inch, 1,506 linear feet of 30-inch force main
and 2-triplex pumping stations (28 HP). Design fees for the project were $403,151. The $4.09M project began in
May 2011 and was completed in January 2014 with no liquidated damages. Work included surveying, utility
easement acquisition, utility locating, FEMA grant applications, planning, design, cost estimates, preparation of
construction plans and contract documents, permitting, bidding, construction management and limited engineering
services during construction. The project was inspected and certified by the City Engineer's office.
o. (1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
Spring Lake Improvement District PROFESSIONAL CONSTRUCTION (if
Stormwater Pump Station Rehabilitation SERVICES aoolicable)
Sebring, Florida 2015 2018
(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm
Survey for the rehabiliation of a 50-year old stormwater pump station located at the District's eastern boundary
service area. Work included replacement of the four (4) stormwater pump 54-inch diameter discharge pipes which
were leaking. Additional pump station upgrades included replacement of the electrical control panel, installation of
a data flow SCADA system, a new emergency generator with automatic transfer switch (ATS), rehabilitation of the
two (2) diesel driven stormwater pumps and replacement of the belt drives of the two (2) electric stormwater pumps.
Also the pump station building lights, level controls and security systems were replaced. Lastly, the building interior
was painted, the perimeter chain link fence replaced and the existing canal bank was reshaped and rip rap material
installed. CAS prepared the record drawings.
Total project design cost (including construction management) was $125,000 and total construction cost was
$404,477.
E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person)
12.NAME
Michael Marenco
13.ROLE IN THIS CONTRACT
CADD Operations Manager
15.FIRM NAME AND LOCATION (City and State)
Craig A. Smith and Associates, Inc.
Boca Raton, Florida
16.EDUCATION (DEGREE AND SPECIALIZATION)
Sheridan Technical
14.YEARS EXPERIENCE
a.TOT AL b. WITH CURRENT
FIRM
15 15
17.CURRENTLY PROF ESSIONAL
REGISTRATION {STATE AND DISCIPLINE)
18.OTHER PROFESSIONAL QUALIFICATIONS (Pub lications, Organization, Training, Awards, etc.)
Architectural Draftsman in AutoCAD
Civil Draftsman in Au toCAD
Survey Draftsman in AutoCAD
a.
19.RELEVANT PROJECTS
(1)TITLE AND LOCATION (City and State)
Village of Bal Harbour
Bal Harbour, Florida
2 YEAR COMPLETED
PROFESSIONAL CONSTRUCTION (if
SERVICES a licable
2015 2017
3 BRIEF DESCRIPTION sea e, size, cost, etc. and SPECIFIC ROLE x Check if pro·ect erformed with current firm
The creation of specific purpose survey as well as plan and profile civil engineering design plans and an updated
survey record as-built for a newer gravity sewer system and triplex submersible wastewater pump station.
b.(1) TITLE AND LOCATION (City and State)
Village of Bal Harbour 2 YEAR COMPLETED
PROFESSIONAL CONSTRUCTION (if Bal Harbour, Florida SERVICES a licable
2011 2013
3 BRIEF DESCRIPTION sea e, size, cost, etc. and SPECIFIC ROLE x Check if pro·ect performed with current firm
The creation of specific purpose survey along with the plan and profile civil engineering design plans and a record
as-built for newer water main system.
c.(1) TITLE AND LOCATION (City and State)
Stormwater Master Plan
Town of Golden Beach, Florida
2 YEAR COMPLETED
PROFESSIONAL CONST RUCTION (if
SERVICES a licable
2001-2003 NIA
3 BRIEF DESCRIPTION sea e, size, cost, etc. and SPECIFIC ROLE X Check if pro·ect performed with current firm
The creation of specific purpose survey as well as the digital and hard copy plan and profile civil engineering plans
and updated record as-builts as part of a design team for a collaborative digital end product.
d.(1) TITLE AND LOCATION (City and State)
Stormwater Multiple Phase Improvements
City of Sweetwater, Florida
2 YEAR COMPLETED
PROFESSIONAL CONST RUCTION {if
SERVICES a licable
1998-2011 2000-2014
3 BRIEF DESCRIPTION sea e, size, cost, etc. and SPECIFIC ROLE x Check if pro·ect performed with current firm
The creation of specific purpose survey as well as plan and profile civil engineering design plans and a record as
built for newer stormwater drainage system.
e.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
Multiple Lift Station Renovations PROFES SIONAL CONST RUCTION (if
City of Margate, Florida SERVICES aoolicable)
2001 -Onaoina Onaoina
(3)BRIEF DESCRIPTION (scooe, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm
The creation of civil engineering plans and mechanical engineering design plans for the rehabilitation of eight (8)
wastewater lift stations throughout the city.
f.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
Radar Tomography Subsurface Utility Map PROFESSIONAL CONST RUCTION (if
Broward County Courthouse SERVICES aoolicable)
2012 NIA
(3)BRIEF DESCRIPTION Cscooe, size, cost, etc.) and SPECIFIC ROLE X Check if proiect performed with current firm
The creation of an updated 3D model consisting of all subsurface features to be used as a base file in the future
design of new facilities by others.
E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person)
12.NAME
James Driscoll
13.ROLE IN THIS CONTRACT
Director of Subsurface Utility Engineering
(SUE)
15.FIRM NAME AND LOCATION (City and State)
Craig A. Smith and Associates, Inc.
Boca Raton, Florida
16.EDUCATION (DEGREE AND SPECIALIZATION)
14.YEARS EXPERIENCE
a.TOT AL b.WITH CURRENT
FIRM
32 29
17.CURRENTLY PROFESSIONAL
REGISTRATION STATE AND DISCIPLINE
18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organization, Training, Awards, etc.)
CADD Centers of Florida -CADD Technician; Traffic Safety in the Workplace, FOOT;
Metro Tech -9890 XT Operator; MALA Geosciences -Ground Penetrating Radar Theory;
MALA Geosciences -GPR Scanning Techniques; MALA Geosciences -Easy Locator & RAMAC X3M
0 erator; National Utilit Locatin Contractors Association NUCLA
19.RELEVANT PROJECTS
a.(1) TITLE AND LOCATION (City and State)
General Subsurface Utility Services
Town of Jupiter, Florida
2 YEAR COMPLETED
PROFESSIONAL CONSTRUCTION (if
SERVICES a licable
On oin N/A
3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE X Check if pro·ect performed with current firm
Continuing contract for utility locating services for the Town's service area on an as-needed basis.
b.(1) TITLE AND LOCATION (City and State)
General Subsurface Utility Services
Town of Davie, Florida
2 YEAR COMPLETED
PROFESSIONAL CONST RUCTION (if
SERVICES a licable
On oin N/A
3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE X Check if ro·ect performed with current firm
Currently contracted with Town of Davie to perform complete subsurface utility services of the town's existing
water, sanitary sewer, force main, reclaimed water and street lighting infrastructure. Provides Town with project
specific locates and soft dig information since 2003. Average annual fee of $90,500.
c.(1) TITLE AND LOCATION (City and State)
General Subsurface Utility Services
City of Coconut Creek, Florida
2 YEAR COMPLETED
PROFESSIONAL CONSTRUCTION (if
SERVICES a licable
On oin N/A
3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE X Check if pro·ect performed with current firm
Continuing contract for utility locating services for the City's service area on an as-needed basis.
d.(1) TITLE AND LOCATION (City and State)
General Subsurface Utility Services
Martin County, Florida
2 YEAR COMPLETED
PROFESSIONAL CONSTRUCTION (if
SERVICES a licable
2015-2019 N/A
3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE X Check if ro·ect performed with current firm
Continuing contract for utility locating services for the County's service area on an as-needed basis.
e.(1) TITLE AND LOCATION (City and State)
General Subsurface Utility Services
City of Hollywood, Florida
2 YEAR COMPLETED
PROFESSIONAL CONSTRUCTION (if
SERVICES a licable
On oin N/A
3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE X Check if pro·ect performed with current firm
Continuing contract for utility locating services for the County's service area on an as-needed basis.
f.(1) TITLE AND LOCATION (City and State)(2} YEAR COMPLETED
General Subsurface Utility Services PROFESSIONAL CONSTRUC TION (if
City of Cooper City, Florida SERVICES aoolicable)
2008-2019 N/A
(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm
Continuing contract for utility locating services for the County's service area on an as-needed basis.
g.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
Bal Harbour Village PROFESSIONAL CONSTRUCTION (if
Bal Harbour Village, Florida SERVICES aoolicable)
2014 2016
(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm
Various survey mapping and utility locates for construction projects for the expansion and/or rehabilitation of
utilities (pipelines and wastewater lift stations), acting as the Village Engineers, projects include Collins Avenue
(SR A1A) from 73 rd Street to 96th Street and 96 th Street to the Haulover cut (approximately 3 miles) and
rehabilitation of Lift Station No. 1 and installation of Lift Station No. 3. Also included is ongoing surveying and
utility locates as needed and a major route survey for the rehabilitation of the Village utility system and roadways
(approximately 3 miles lineally).
h.(1) TITLE AND LOCATION (City and State)(2} YEAR COMPLETED
AECOM/DRAGADOS PROFESSIONAL CONSTRUCTION (if
Fort Lauderdale, Florida SERVICES aoolicable)
2010 NIA
(3) BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm
Specific purpose survey and subsurface utility engineering services enhanced with 3D Radar Tomography in
advance of construction activities. Performed over 1 M square feet of 3D, RT, GPR, EM locating and 750 vacuum
excavation soft digs to assist in identifying potential conflicts between existing subsurface systems and numerous
proposed bridge column and sign foundations.
i.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
Regional Water Reclamation Facility PROFESSIONAL CONSTRUCTION (if
West Palm Beach, Florida SERVICES applicable)
2019 N/A
(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm
CAS performed Subsurface Utility Engineering services as a subconsultant to Hazen & Sawyer, Inc. for the City of
West Palm Beach East Central Regional Water Reclamation Facility. The scope of work included survey to
establish horizontal control, benchmarks and locating all pertinent above ground visible improvements and utilities
within the project area. Utility surface designation and mapping was performed utilizing 2D Ground Penetrating
Ra dar, 3D Radar Tomography scanning and calibration soft digs for approximately 260,000 ft2 of the facility to
identify types, sizes and locations of buried utilities. Deliverables included full electronic files containing CAD,
survey data and imagery collected and scanning performed for this project. All files were compatible with the Civil
3D CADD platform. Total project cost was $36,330.
j. (1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
Seminole Pratt-Whitney Road/Northlake Water and Force PROFESSIONAL CONSTRUCTION (if
Main Improvements SERVICES aoolicable)
Palm Beach County, Florida 2019 N/A
(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm
CAS performed subsurface utility engineering as a subconsultant to Chen Moore & Associates, Inc. for the Palm
Beach County Water Utilities Department. The scope of work included soft digs at forty (40) designated locations
to verify depths, sizes and materials of conflicting buried utilities for the design of a water main replacement along
Seminole Pratt-Whitney Road between Orange Boulevard and 88th Street. Total project cost was $24,875.
I
I
I
E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
14.YEARS EXPERIENCE
12. NAME
ALAN LOPEZ
13.ROLE IN THIS CONTRACT
SUE FIELD SUPERVISOR
a. TOTAL b.WITH CURRENT FIRM
19 12
15.FIRM NAME AND LOCATION (City and State)
CRAIG A. SMITH & ASSOCIATES
BOCA RATON, FLORIDA
16. EDUCATION (DEGREE AND SPEC/ALIZA TIONJ 17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE)
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organization, Training, Awards, etc.)
IMSA WORK ZONE SAFETY CERTIFICATION
METRO TECH -THEORIES OF SUBSURFACE DESIGNATING
MALA GEOSCIENCES -GROUND PENETRATING RADAR THEORY
MALA GEOSCIENCES -GPR SCANNING TECHNIQUES
MALA GEOSCIENCES -EASY LOCATOR & RAMAC X3M OPERATOR
NATIONAL UTILITY LOCATING CONTRACTORS ASSOCIATION (NULCA)
a.
C.
b.
19.RELEVANT PROJECTS
1) TITLE AND LOCATION (CITY AND STATE) 12) YEAR COMPLETED
CITY OF POMPANO BEACH PROFESSIONAL SERVICES CONSTRUCTION (IF APPLICABLE
SW 2ND STREET DRAINAGE SURVEYING AND MAPPING 2018 TBD
3) BRIEF DESCRIPTION (brief scope, size, cost, etc.) AND SPECIFIC ROLE x CHECK IF PROJECT PERFORMED WITH CURRENT FIRM ROUTE SURVEY INCLUDING ALL ABOVE GROUND FEATURES WITHIN EXISTING RIGHT-OF-WAY AND OFF-SITE SURVEYING OF
CRITICAL DRAINAGE STRUCTURES. SCOPE OF WORK INCLUDES 20 GRP UTILITY LOCATES WITHIN THE PROJECT CORRIDOR
(SW 2 No STREET BETWEEN DIXIE HIGHWAY AND CYPRESS ROAD, SW 15T AVENUE BETWEEN SW 2ND STREET AND ATLANTIC
BOULEVARD, ANO SW 1 sT TERRACE & COURT BETWEEN SW 2No STREET AND SOUTH CYPRESS ROAD).
COST: $22,300
1) TITLE AND LOCATION (CITY AND STATE) (2) YEAR COMPLETED CITY OF HOLLYWOOD UTILITIES PROFESSIONAL SERVICES CONSTRUCTION (IF APPLICABLE)
HOLLYWOOD, FLORIDA ONGOING NIA
(3) BRIEF DESCRIPTION (brief scope, size, cost, etc.) AND SPECIFIC ROLE x CHECK IF PROJECT PERFORMED WITH CURRENT FIRM COMPLETE RESPONSIBILITY FOR PROVIDING ONE CALL UTILITY LOCATES FOR CITY OWNED WATER, SEWER, RECLAIM,
STREETS LIGHTS AND MONIR POWER FACILITIES.
COST: $200,000+ANNUALL Y
(1) TITLE AND LOCATION (CITY AND STATE) 12) YEAR COMPLETED
PROFESSIONAL SERVICE! CONSTRUCTION (IF APPLICABLE)
PALM BEACH COUNTY WATER UTILITIES SURVEYING AND MAPPIN(
2019 NIA SEMINOLE PRATT-WHITNEY ROAD/NORTHLAKE WATER AND FORCE
MAIN IMPROVEMENTS
PALM BEACH, FLORIDA
3) BRIEF DESCRIPTION (brief scope, size, cost, etc.) AND SPECIFIC ROLE x CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
PERFORMED SUBSURFACE UTLITY ENGINEERING USING GPR AND 40 VACUUM EXCAVATIONS FOR WATER AND FORCE MAIN
IMPROVEMENTS.
COST: $24,875
I 1) TITLE ANO LOCATION {CITY AND STA TE:) (2) YEAR COMP LETEDBROWARD COUNTY ENGINEERING PROFESSIONAL SERVICES CONSTRUCTION (IF APPLICABLE)
WILES ROAD IMPROVEMENTS 2019 NIA
c.BROWARD COUNTY FLORIDA
3) BRIEF DESCRIPTION (brief scope, size, cost, etc.) ANO SPECIFIC ROLE x CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
PERFORMED SUBSURFACE UTILITY ENGINEERING USING GRP & 100 VACUUM EXCAVATIONS ON EXISTING BURIED UTILITIES FOR
PAVING AND DRAINAGE IMPROVEMENTS.
COST $54,000
I 1) TITLE ANO LOCATION {CITY AND STA TE:) 12\ YEAR COMPLETED CITY OF MIAMI BEACH PROFESSIONAL SERVICES CONSTRUC TION (IF APPLICABLE
LIGHT RAIUMODERN STREETCAR PROJECT SURVEYING AND MAPPING
2016 NIA
e. MIAMI BEACH, FLORIDA
3) BRIEF DESCRIPTION (brief scope, size, cost, etc.) ANO SPECIFIC ROLE x CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
MAP OF TOPOGRAPHIC SURVEY/ROUTE SURVEYS ADHERING TO THE MIAMI BEACH PUBLIC WORKS MANUAL -SECTION 1A -
SURVEYING STANDARDS AND REQUIREMENTS ALONG THE CORRIDORS. ALL VISIBLE IMPROVEMENTS WERE LOCATED AND
SHOWN. ABOVE AND BELOW GROUND UTILITIES AND DRAINAGE WERE IDENTIFIED AS WELL AS TREES AND LANDSCAPED
AREAS TO 25 FEET OUTSIDE EACH RIGHT OF WAY LINE. CROSS-SECTIONS WERE TAKEN AT 50-FOOT INTERVALS. ELEVATIONS
AT ENTRY THRESHOLDS OF STRUCTURES WERE ALSO PROVIDED.
COST: $300,000(+)
I 1) TITLE AND LOCATION (CITY AND STA TE:) 12)YEAR COMPLETEDTOWN OF DAVIE UTILITIES PROFESSIONAL SERVICES CONSTRUCTION (IF APPLICABLE)
f. BROWARD COUNTY, FLORIDA ONGOING NIA
3) BRIEF DESCRIPTION (brief scope, size, cost, etc.) ANO SPECIFIC ROLE x CHECK IF PROJECT PERFORMED WITH CURRENT FIRM I COMP LETE RESPONSIBILITY FOR PROVIDING ONE CALL UTILITY LOCATES FOR CITY OWNED WATER, SEWER, RECLAIM,
STREETS LIGHTS AND MONIR POWER FACILITIES.
COST: $150,000+ANNUALLY
I 1) TITLE ANO LOCATION {CITY AND STA TE:) 12) YEAR COMPLETED UNITED STATES NAVY PROFESSIONAL SERVICES CONSTRUCTION (IF APPLICABLE)
h. NAVAL AIR STATION KEY WEST 2018 NIA
MONROE COUNTY, FLORIDA
3) BRIEF DESCRIPTION {brief scope, size, cost, etc.) ANO SPECIFIC ROLE x CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
COMP LETE RESPONSIBILITY FOR ALL UTILITY LOCATES AND SUBSURFACE UTILITY ENGINEERING FOR US NAVY FACILITIES AT
ALL BASE AREAS AND ANNEXES IN AND AROUND NAVAL AIR STATION KEY WEST INCLUDING, WATER, SEWER, RECLAIM, BRINE,
FIBER OPTIC, ALL ELECTRIC (PRIMARY, FEEDER, SECONDARY & SERVICE LINES), STREET LIGHTING, SCADA, AND SECURE
COMMUNICATION LINES
COST: $75,000+ANNUALL Y
1) TITLE AND LOCATION {CITY AND STATE:) /2l YEAR COMPLETED PALM BEACH COUNTY WATER UTILITIES DEPARTMENT PROFESSIONAL SERVICES CONSTRUCTION (IF APPLICABLE
L VONS ROAD FORCE MAIN REPLACEMENT -PHASE II SURVEYING AND MAPPING
2018 NIA
i. 3) BRIEF DESCRIPTION {brief scope, size, cost, etc.) ANO SPECIFIC ROLE x CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
ROUTE SURVEY AND UTILITY LOCATES WITHIN EXISTING RIGHT-OF-WAY.
COST: $12,750
E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person)
12.NAME
Tony Gomes
13.ROLE IN THIS CONTRACT
Senior Field Representative
14.YEARS EXPERIENCE
a.TOT AL b.WITH CURRENT
FIRM
42 36
15.FIRM NAME AND LOCATION (City and State)
Craig A. Smith and Associates, Inc.
Boca Raton, Florida
16.EDUCATION (DEGREE AND SPECIALIZATION)
A.A. Business Management
17.CURRENTLY PROFESSIONAL
REGISTRATION (STATE AND DISCIPLINE)
Universit of Massachusetts, Amherst
18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organization, Training, Awards, etc.)
Survey Courses -University of Miami
Licensure -As halt Plant Tech FOOT #R-1712, As halt Roadwa Tech FOOT #5659
19.RELEVANT PROJECTS
a.(1) TITLE AND LOCATION (City and State)
Golden Beach Capital Improvement Project
Golden Beach, Florida
2 YEAR COMPLETED
PROFESSIONAL CONSTRUCTION (if
SERVICES a licable
b.
C.
2008 2012
3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE x Check if project performed with current firm
Responsible for daily construction observation/inspection of $17 .5 million project including stormwater, water main,
electrical, pavement, sidewalk and landscaping improvements.
(1)TITLE AND LOCATION (City and State)
Sunshine Water Control District (SWCD)
West Outfall Canal Improvements
Coral Springs, Florida
2 YEAR COMPLETED
PROFESSIONAL CONSTRUCTION (if
SERVICES a licable
3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE X Check if pro·ect performed with current firm
Conceptual hydraulic modeling of a 2-mile primary canal of the SWCD. Phase 1 design, permitting, modeling,
bidding, community outreach, and construction management of the $3 million project.
(1)TITLE AND LOCATION (City and State)
Stormwater Ponds Bank Repairs
Walnut Creek Community Development District (WCDD)
Pembroke Pines, Florida
2 YEAR COMPLETED
PROFESSIONAL CONSTRUCTION (if
SERVICES a licable
3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE x Check if pro·ect performed with current firm
Responsible for daily construction observation/inspection of 18,216 linear feet of geofabric tubes, 103,000 plants
and 15,000 square yards of sod. Construction cost were $594,600.
d. (1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
NE 174th Street Stormwater and Pavement Improvements PROFESSIONAL CONSTRUCTION (if
Sunny Isles Beach, Florida SERVICES aoolicable)
2014 2017
(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm
Responsible for daily construction observation/inspection, pay applications and project closeout for the restoration
of 0.2 miles of roadway and drainage improvements. Construction costs totaled $2.14 million.
e. (1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
Capital Improvement Project phase Ill & IV Stormwater PROFESSIONAL CONST RUCTION (if Collection System with Master Pump Station SE RVICES applicable) Golden Beach, Florida 2009 2011
(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm
Responsible for daily construction observation/inspection of the stormwater improvements for Phases II and IV
consisting of a stormwater master pumping station with submersible pumps, 14,500 linear feet of DIP drainage
pipe and force main (ranging in size from 16" to 72"), 205 drainage structures and 7 outfalls. Design costs for the
oroiect were $1,263,240. Total construction costs were $7,667,276.
E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person)
12.NAME
William Tanto
13.ROLE IN THIS CONTRACT
Senior Field Representative
15.FIRM NAME AND LOCATION (City and State)
Craig A. Smith and Associates, Inc.
Boca Raton, Florida
16.EDUCATION (DEGREE AND SPECIALIZATION)
Atlantic Vocational Technical Center
14.YEARS EXPERIENCE
a.TOT AL b.WITH CURRENT
FIRM
26 24
17.CURRENTLY PROFESSIONAL
REGISTRATION (STATE AND DISCIPLINE)
18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organization, Training, Awards, etc.)
•FOOT Construction, Qualifications
•FOOT - Construction OSHA Awareness Safety Training
•FDEP Stormwater Erosion & Sedimentation Control Inspector No. 15102
19.RELEVANT PROJECTS
a. (1)TITLE AND LOCATION (City and State)2 YEAR COMPLETED
Capital Improvements Project Phase II and IV Stormwater PROFESSIONAL CONSTRUCTION (if
Collection System with Master Pump Stations SERVICES a licable
Golden Beach, Florida 2009 2011
3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE X Check if project performed with current firm
Responsible for daily construction observation/ inspection of the stormwater improvement phase phases II and Iv
consisting of a stormwater master pumping station with submersible pumps, 14,500 linear feet of DIP drainage pipe
and force main (ranging in size from 16" to 72"), 205 drainage structures and 7 outfalls. Design costs for the project
were $1,263,240. Total construction costs were $7,667,276.
b. (1)TITLE AND LOCATION (City and State)
Lake Osborne Estates Water Replacement Ph 1 Expansion
Lake Worth, Florida
2 YEAR COMPLETED
PROFESSIONAL CONSTRUCTION (if
SERVICES a licable
2020
3 BRIEF DESCRIPTION sco e, size, cost, etc. and SPECIFIC ROLE X Check if pro·ect performed with current firm
Responsible for daily construction observation I inspection, pay application, and project close out for the Phase 1
expansion improvements which include the installation of an additional 1,500 linear feet of new 6"-8" PVC water
main serving 41 homes in the Lake Osborne Estate residential area along Lake Geneva Drive, Lake Osborne Drive,
Nanette Court and High Ridge Road. The new water main will replace existing asbestos cement pipe (ACP) and
also improve fire protection and pressures to the neighborhood residences. Work also includes the abandonment
of 2,650 linear feet of existing ACP water mains and the relocation of meters and services from the rear of the
residential lots to the front of the lots. Additional services include public outreach and existing permit modifications.
CAS, through public informational meetings, has familiarized homeowners with the project scope and involved
homeowners during the design process by incorporating design elements such as location of water service lines
and meter box location preferences on their property and shall address any other concerns during the construction
phase. Design costs are $96,400 and estimated construction costs are $300,000. The project was approved by the
City as a change order to the existing Phase I construction contract.
C.(1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
City-County Public Works Avenue L, M, N & 4th Street PROFESSIONAL CONSTRUCTION (if Sanitary Sewer Improvements SERVICES aoolicable) Glades County, Florida 2014 2016
(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm
Responsible for daily construction observation / inspection for the installation of a duplex submersible lift station
with approximately 8-foot diameter wet well and 350 linear feet of 6-inch force main along with 6,344 linear feet of
8" and 1 O" gravity sewer with seventeen (17) sanitary sewer manholes. The total design costs for the project were
$52,425 with construction costs totaling $1,286,627.
d.(1) TITLE AND LOCATION (City and State)(2} YEAR COMPLETED
Bal Harbour Village PROFESSIONAL CONSTRUCTION (if Sanitary Sewer Improvements Phase1 SERVICES applicable)
Bal Harbour, Florida 2015 2017
(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm
Responsible for the daily construction observation I inspection for the installation of a new triplex submersible pump
station with a 12 diameter wet well, control panel, automatic transfer switch receptacle, emergency generator, and
all associated appurtenances, in addition to approximately 1,350 linear feet of 18" gravity sewer lines to the pump
station. The project design cost was $182,804. Construction cost was $2,970,000.
e. (1)TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
Avenue R Stormwater Improvements PROFESSIONAL CONSTRUCTION (if Moore Haven, Florida SERVICES applicable)
2016 2018
(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm
Responsible for daily construction observation I inspection for the relocation of existing utilities and the installation
of 1,200 LF of plastic swale liner, 350 LF of PBC culverts, ten (1) concrete headwalls, one (1) drainage structure,
4,000 SY of sod and the regrading of 4,000 SY of swale. Construction cost was $393,304.
f. (1)TITLE AND LOCATION (City and State)(2)YEAR COMPLETED
Sanitary Sewer Pump Stations and Forcemain Improvements PROFESSIONAL CONSTRUCTION (if
Pembroke Park, Florida SERVICES applicable)
2002 2009
(3)BRIEF DESCRIPTION (scope, size, cost, etc.) and SPECIFIC ROLE X Check if project performed with current firm
Responsible for daily construction observation/ inspection for the installation of 1,500 linear feet of 10-inch force
main which remained a dry line for four years until further funding became available. Remaining work included the
rehabilitation of 22 lift stations, the decommissioning of 6 existing lift stations and the installation of a magmeter
with telemetry system. Design fees for this project were $417,700. The project was completed in 2009 after six
vears with a construction cost of $2,907,930.
I
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S ' 0. EXAMPLE PROJECT KEY NUMBER
1 QUALI FICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 70 projects, if not specified.
Complete one Section F for each project.)
21. TIT LE AND LOCATION (Coty and State) 22. YEAR COMPLETED
NE 174th Street Stormwater and Pavement Improvements
Sunny Isles Beach, Florida
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2014 2017
23. PROJECT OWNER'S INFORMATION
a.PROJECT OWNER b. POINT OF CONTACT
City of Sunny Isles Beach Christopher Russo
City Manager
c. POI NT OF CONTACT TELEPHONE NUMBER
(305)792-1776
24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost}
Survey, utility locates, preparation of engineering design and construction plans, stormwater modeling and calculations,
cost estimates, contract documents and permitting for the Roadway Improvements Project for NE 174th Street. The
project consists of a reconstruction of both the drainage and the road for approximately 0.2 miles from Collins Avenue
to North Bay Road. The existing roadway system was failing due to poor soil conditions, a limited drainage system and
an undersized outfall. The new roadway incorporated a reconstructed base with geotech fabric to offset the soils. The
design also included a new drainage system that meets water quality requirements, site demolition, road regrading, fibre
optic relocation, future conduit for telecom lines, sidewalks and paver walkways, landscaping, curbing, bike paths and
parallel parking. The design was completed within two years, under budget, at a cost of $212,180. Construction of the
first half of the project has been competed in 2016 with an estimated cost of $2,147,800.
25 FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1)FIRM NAME (2) FIRM LOCATION (City and State} (3) ROLE
a. Craig A. Smith & Associates, Boca Raton, Florida Prime Consultant
Inc.
(1) FIRM NAME (2)FIRM LOCATION (City and State} (3) ROLE
b.
(1) FIRM NAME (2) FIRM LOCATION (City and State} (3) ROLE
c.
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S '
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 70 projects, if not specified.
Complete one Section F for each project.)
0. EXAMPLE PROJECT KEY
NUMBER
2
21. TITLE AND LOCATION (City and State) 22. YEAR COMP LETED
Capital Improvements Project Phase Ill & IV
Stormwater Collection System with Master Pump Stations
Golden Beach, Florida
PROFESSIONAL SERVICES
2009
CONSTRUCTION (If applicable)
2011
23.PROJECT OWNER'S INFORMATION
d. PROJECT OWNER
Town of Golden Beach
e. POINT OF CONTACT
Alexander Diaz
Town Manaqer
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
f. POINT OF CONTACT TELEPHONE NUMBER
(305)932-0744
Stormwater design, survey, utility locates, permitting, cost estimates, construction management and construction
observation, survey as-builts and certifications through project close-out as part of a Town Capital Improvement
Project Stormwater Improvements for Phase Ill and IV were designed and constructed to be consistent with the
Town's overall Master Plan. The project consisted of a stormwater master pumping station with submersible
pumps, 14,500 linear feet of DIP drainage pipe and force main (ranging in size from 16" to 72"), 205 drainage
structures and 7 outfalls.
Project Cost: $7,667,276
25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
a.Craig A. Smith & Associates,Boca Raton, Florida Prime Consultant
Inc.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
b.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
C.
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TE AM'S 0. EXAM PLE PROJECT KEY
NUMBER QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 70 projects, if not specifted. 3
Complete one Section F for each project)
21. TITLE AND LOCATION (City and State) I 22. YEAR COMPL ETED
Palm & Hibiscus Island Stormwater & Roadway Improvements
Miami Beach, Florida
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2015 2019
23.PROJECT OWNER'S INFORMATION
g. PROJECT OWNER
City of Miami Beach
h. POINT OF CONTACT
Jeffrey Crews, P.E. (Stantec)
Proiect Manaaer
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
i. POINT OF CONTACT TELEPHONE NUMBER
(954)804-2715
Survey, engineering stormwater design, drainage calculations and modeling, cost estimates, permitting, and
engineering services during construction for the Palm and Hibiscus Island Stormwater and Roadway
Improvements. The project is a Capital Improvement Project structured as a design/build with Lanzo Construction.
GAS was responsible for the drainage system, roadway design and harmonization components of the GIP. The
design incorporated engineering techniques to reduce future sea level rises such as elevating the existing
roadways, increasing the size of the drainage system, providing water quality, installing three (3) stormwater
pump stations and backflow prevention devices to avoid extreme high tides from re-entering the systems. Work
also in cluded electric and communication line conversion from overhead to underground on Hibiscus Island.
Project Cost: $8,000,000
25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
a. Craig A. Smith & Associates,Boca Raton, Florida Subconsultant
Inc.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
b.
{1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
C.
I
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S '
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
0.EXAMPLE PROJECT KEY
NUMBER
4
21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED
Wauchula Hills Water and Sanitary Sewer
Improvements Phase IV
Hardee County, Florida
PROFESSIONAL SERVICES
2017
23.PROJECT OWNER'S INFORMATION
CONSTRUCTION (If applicable)
Ongoing
a. PROJECT OWNER b. POINT OF CONTACT
Park Winter
c. POINT OF CONTACT TELE PHONE NUMBER
Hardee County (863)773 3030
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, end cost)
CAS pro vided professional engineering services for the installation of the water and sanitary sewer improvements included
approximatel y 6,125 linear feet of 8" water main and 5,277 linear feet of 8" gravity sanitary sewer including connection to
51 private residences and the decommissioning of septic tanks and potable water wells. This project was funded through
a multi-year special legislative appropriation. The project design costs, including construction management, were $189,628
and project construction costs totaled $1,249,013. Project construction began in March 2017 and was completed in
October 2017 on schedule and under budget by $417,948.
Preliminary planning, survey, design, permitting, preparation of construction plans and contract documents, assistance in
securing grant funding for project, bidding, cost estimates, construction management and construction observation through
project closeout.
25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3)ROLE
a.Craig A Smith &Boca Raton, Florida Prime
Associates, Inc.
(1) FIRM NAME (2)FIRM LOCATION (City and State) (3) ROLE
b.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3)ROLE
c. 277
(277)
l
'
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPO SED TEAM'S '
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 70 projects, if not specified.
Complete one Section F for each project.)
0. EXAMPLE PROJECT KEY
NUMBER
5
21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED
Lift Station No. 22 Rehabilitation
Margate, Florida
PROFESSIONAL SERVICES
2015
23.PROJECT OWNER'S INFORMATION
CONSTRUCTION (If applicable)
2016
a. PROJECT OWNER b. POINT OF CONTACT c. POINT OF CONTACT TELEPHONE NUMBER
City of Margate Alberto Tor res-Soto, P.E. (954)972 0828
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost}
The Lift Station No. 22 Renovation Project consists of decommissioning the existing wet pit/dry pit lift station and
reinstalling a new wet well and valve vault; including the installation of all SS piping inside the proposed wet well, relining
existing structures, manholes, gravity sewer, fencing, system start-up and upgrading the electrical equipment, control
panel and SCADA system. The total design cost for this project was $18,488. The construction cost for this project was
$571,667.25 and was completed in December 2016.
Design, preparation of construction plans and contract documents, permitting, bidding, construction management and
limited construction observation through project closeout/start-up services.
25 FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State} (3) ROLE
a.Craig A. Smith &Boca Raton, Florida Prim e
Associates, Inc.
(1) FIRM NAME (2) FIRM LOCATION (City and State} (3) ROLE
b.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
C. 132 I
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S '
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
0.EXAMPLE PROJECT KEY
NUMBER
6
21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED
Sanitary Sewer Pump Stations & Force Main
Improvem ents
Pembroke Park, Florida
PROFESSIONAL SERVICES
2002
23.PROJECT OWNER'S INFORMATION
CONSTRUCTION (If applicable)
2009
a.PROJECT OWNER b. POINT OF CONTACT c. POINT OF CONTACT TELEPHONE NUMBER
Town of Pembroke Park Howard Clark (954)966-4600
24. BRIEF DESC RIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, end cost)
The Sanitary Pump Station and Force Main Improvements Project for the Town of Pembroke Park was completely
funded by a Rural Development Grant. Improvements included the installation of 1,500 linear feet of 10-inch force main
which remained a dry line for four years until further funding became available. Remaining work included the
rehabilitation of 22 lift stations, the decommissioning of 6 existing lift stations and the installation of a magmeter with
telemetry system. Design fees for this project were $417,700. The project was completed in 2009 after six years with a
construction cost of $2,907,930. The project was completed within the accepted schedule and budget with no liquidated
damages.
Survey, utility locates, grant assistance and administration, design, preparation of construction plans and contract
documents, permitting, assistance during bidding, construction management and construction observation, start-up, as
builts and final certification through project close-out.
25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1)FIRM NAME (2) FIRM LOCATION (City end State) (3) ROLE
a. Craig A. Smith &Boca Raton, Florida Prime
Associates, Inc.
(1)FIRM NAME (2) FIRM LOCATION (City end State) (3) ROLE
b.
(1) FIRM NAME (2) FIRM LOCATION (City end State) (3) ROLE
C.
74
(
I
I
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S '
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 70 projects, if not specified.
Complete one Section F for each project.}
0. EXAMPLE PROJECT KEY
NUMBER
7
21. TITLE AND LOCATION (City and State)
Avenue R Stormwater Improvements
Moore Haven, Florida
22. YEAR COMPL ETED
s. PROJECT OWNER
City of Moore Haven
PROFESSIONAL SERVICES CONSTRU CTION (II applicable)
2016 2018
23.PROJECT OWNER'S INFORMATION
t. POINT OF CONTACT
Bret Whidden
Mayor
u. POINT OF CONTACT TELEPHONE NUMBER
(863)946-0711
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, sire, and cost/
Project budget, estimating, funding procurement, surveying, GPR locating, design, permitting, contract documents,
bidding assistance, engineering services during construction, construction observation services and project
certification for the Avenue R Stormwater Improvements for the City of Moore Haven. The city continues to
address flooding and water quality issues by improving its existing conveyance systems with upgrades to existing
swales, box culverts, flow efficiency devices, drainage apparatuses and stormwater pump stations. This phase
of stormwater improvements involved the relocation of existing utilities and the installation of 1,200 LF of plastic
swale liner (1/4 section of 12-inch ID smooth inner wall perforated black P.E. pipe), 350 LF of PVC culverts, ten
(10)concrete headwalls, one (1) drainage structure, 4,000 SY of sod and the regrading of 4,000 SY of swale. This
project was funded using state grants secured with the help of GAS and GAS Governmental Services.
Project Cost: $393,304
25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State/ (3) ROLE
a.Craig A. Smith & Associates,Boca Raton, Florida Prime Consultant
Inc.
(1) FIRM NAME (2) FIRM LOCATION (City and State/ (3) ROLE
b.
(1) FIRM NAME (2) FIRM LOCATION (City and State/ (3) ROLE
C.
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S '
QUA Li FiCA TIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 70 projects, if not specified.
Complete one Section F for each project.}
0. EXAMPLE PROJECT KEY
NUMBER
8
21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED
Stormwater & Pump Station Improvements Phase IV
Sweetwater, Florida
PROFESSIONAL SERVICES
2011
CONSTRUCTION (If applicable)
2013
23. PROJECT OWNER'S INFORMATION
v. PROJECT OWNER
City of Sweetwater
w.POINT OF CONTACT
Eric Gomez, P.E.
City EnQineer
24. BRIEF DESCR IPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
x. POINT OF CONTACT TELEPHONE NUMBER
(305)553-5457
Provided su rveying, utility locating, FEMA grant applications, planning, design, cost estimates, preparation of
construction plans and contract documents, permitting, bidding, construction management and limited engineering
services during construc tion. The project was inspected and certified by the City Engineer's office. Due to
repetitive, historical flooding within the 138 acre residential area, Phase IV Stormwater Improvements for the City of
Sweetwater received substantial HMGP funding from FEMA. The projects consisted of 130 structures, 1 0, 795
linear feet of drainage pipe ranging in size from 15-inch to 72-inch, 1,506 linear feet of 30-inch force main and two
(2)triplex stormwater pumping stations (28 HP).
Project Cost: $4,090,000
25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City end State} (3) ROLE
a. Craig A. Smith & Associates, Boca Raton, Florida Prime Consultant
Inc.
(1) FIRM NAME (2) FIRM LOCATION (City end State} (3) ROLE
b.
(1) FIRM NAME (2) FIRM LOCATION (City end State} (3) ROLE
C.
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S '
QUALIFICATIONS FOR THIS CONTRACT
0. EXAMPLE PROJECT KEY NUMBER
9
(Pres ent as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
21. TITLE AND LOCATION {City an d State) 22. YEAR COMPLETED
SW 52nd Avenue (North) Roadway and Drainage
Improvements
PROFESSIONAL SERVICES CONSTRUCTION Ill applicable)
Pembroke Park, Florida 2009 2010
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT
Howard Clark
c.POINT OF CONTACT TELEPHONE NUMBER
Town of Pembroke Park 954 966-4600
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, end cost)
The Town of Pembroke Park SW 52nd Avenue (North) Project was the second phase of a roadway and drainage project.
The project consisted of approximately 2,400 linear feet of new roadway (south of Hallandale Beach Boulevard), 2,200
linear feet of 36" HOPE pipe and exfiltration trench and 14 inlets. The project was funded through a CDBG grant for
$844,200. The project included a change order for $580,000 when additional grant funds became available and the
scope of work expanded. Design fees for this project totaled $206,594. The project was completed in May 201 o within
the accepted schedule with no liquidated damages.
Survey, utility locates, design, cost estimates, preparation of construction plans and contract documents, permitting,
bidding, construction management and construction observation, survey as-builts and certification through project close
out.
Project Cost: $844,200
25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
b.
c.
83
(1)FIRM NAME
Craig A. Smith & Associates,
Inc.
(1) FIRM NAME
(1) FIRM NAME
(2) FIRM LOCATION {City end State} (3)ROLE
Boca Raton, Florida Prime Consultant
(2) FIRM LOCATION {City and State} (3)ROLE
(2) FIRM LOCATION {City end State} (3)ROLE
i
I
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S '
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 70 projects, if not specified.
Complete one Section F for each project.}
0.EXAMPLE PROJECT KEY
NUMBER
10
21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED
SW 2 nd Street Drainage Improvements
Pompano Beach, Florida
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Ongoing Ongoing
bb. PROJECT OWNER
City of Pompano Beach
23.PROJECT OWNER'S INFORMATION
cc. POINT OF CONTACT
Tammy Good
Eni:1ineerini:1 Project Manaaer
dd. POINT OF CONTACT TELEPHONE NUMBER
(954)786-5520
24. BRIEF DES CRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, end cost)
Survey, utility locates, geotechnical engineering, engineering drainage analysis, preparation of preliminary engineering
design and construction plans, cost estimates, contract documents and assistance during bidding, shop drawing
review, construction observation and engineering services during construction, and certification through project
closeout for the SW 2nd Street Drainage Improvements project which is located between Dixie Highway and Cypress
Road and south of Atlantic Boulevard within the City's Government District. The project also includes a proposed
stormwater system on SW 1st Avenue and SW 1st Court. The 0.43 miles of roadway are to be designed to alleviate
existing flooding concerns with the possibility of an offsite discharge to a nearby canal.
Project Cost: $550,000
25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2)FIRM LOCATION (City and State) (3) ROLE
a.Craig A. Smith & Associates, Boca Raton, Florida Prime Consultant
Inc.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
b.
(1) FIRM NAME (2)FIRM LOCATION (City and State) (3) ROLE
C.
I
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S '
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 70 projects, if not specified.
Complete one Section F for each project.}
0.EXAMPLE PROJECT KEY
NUMBER
11
21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED
Water Distribution System Improvements
Miami County, Florida
PROFESSIONAL SERVICES
2007
23. PROJECT OWNER'S INFORMATION
CONSTRUCTION (If applicable)
2015
a. PROJECT OWNER b.POINT OF CONTACT c.POINT OF CONTACT TELE PHONE NUMBER
Miccosukee Tribe of Indians
of Florida
Howard Jim, Utility Director
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size. and cost)
(305)223 8380
The water system improvements for the Miccosukee Tribe of Indians of Florida included expansion of the tribe's water
distribution system including 15,000 feet of 12-inch water mains and rehabilitation of existing elevated storage tank piping.
Total design costs for the project were $516,000. Total construction costs were $2,580,000. The project began in 2007
and was completed in June 2015.
Planning, surveying, utility locates, design, hydraulic analysis, permitting and engineering services during construction.
25 FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1)FIRM NAME (2)FIRM LOCATION (City and State) (3) ROLE
a.Craig A. Smith &Boca Raton, Florida Prime
Associates, Inc.
(1)FIRM NAME (2)FIRM LOCATION (City and State) (3) ROLE
b.
(1)FIRM NAME (2)FIRM LOCATION (City and State) (3) ROLE
C.
37
I
I
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S '
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
0. EXAMPLE PROJECT KEY
NUMBER
12
21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED
Stormwater Pump Station Rehabilitation
Sebring, Florida
PROFESSIONAL SERVICES
2015
23.PROJECT OWNER'S INFORMATION
CONSTRUCTION (If applicable)
2018
a. PROJECT OWNER b. POINT OF CONTACT c. POINT OF CONTACT TELEPHONE NUMBER
Spring Lake Improvement
District
Joe DeCerbo
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
(863)655 1715
The scope of work consisted of the rehabiliation of a 50-year old stormwater pump station located at the District's eastern
boundary service area. Work included replacement of the four (4) stormwater pump 54-inch diameter discharge pipes
which were leaking. Additional pump station upgrades included replacement of the electrical control panel, installation of
a data flow SCADA system, a new emergency generator with automatic transfer swiitch (ATS), rehabilitation of the two (2)
diesel driven stormwater pumps and replacement of the belt drives of the two (2) electric stormwater pumps. Also the
pump station building lights, level controls and security systems were replaced. Lastly, the building interior was painted,
the perimeter chain link fence replaced and the existing canal bank was reshaped and rip rap material installed. The total
project design cost (including construction management) was $125,000 and total construction cost was $404,477.
Site survey, design, geotechnical analysis, cost estimates, permitting, preparation of construction plans, contract
documents, bidding assistance and construction management services through project close-out.
25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
a.Craig A. Smith &Boca Raton, Florida Prime
Associates, Inc.
(1 I FIRM NAME (2) FIRM LOCATION (City and State/ (3) ROLE
b.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
c.
89
!
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S '
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
0. EXAMPLE PROJECT KEY
NUMBER
13
21. TITLE AND LOC ATION (City and State) 22. YEAR COMPLETED
Avenue L, M, N & 4th Str. Sanitary Sewer Improvements PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Glades County, Florida 2014 2016
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b.POINT OF CONTACT c. POINT OF CONTACT TELEPHONE NUMBER
City-County Public Works David Miller (863)946-0711
24. BRIEF DESCRIPTION OF PROJECT ANO RELEVANCE TO THIS CONTRACT (Include scope, size, end cost)
The City-County Public Works Authority (CCPWA) Avenue L, M, N and 4th Sewer Lift Station Improvements includes the
installation of a duplex submersible lift station with approximately 8-foot diameter wet well and 350 linear feet of 6-inch
force main along with 6,344 linear feet of 8" and 1 0" gravity sewer with seventeen (17) sanitary sewer manholes. The total
design costs for the project were $52,425 with construction costs totaling $1,286,627. The project was designed and
permitted in September 2014 and construction was completed in March 2016. The project was partially funded by state
legislative appropriation.
Design, survey, permitting, preparation of construction plans and contract documents, assistance during bidding,
engineering services during construction and construction management.
25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1)FIRM NAME (2) FIRM LOCATIO N (City and State) (3)ROLE
a.Craig A. Smith &Boca Raton, Florida Prime
Associates, Inc.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3)ROLE
b.
(1)FIRM NAME (2)FIRM LOCATION (City and State) (3)ROLE
C.
144
:
I
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S '
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 70 projects, if not specified.
Complete one Section F for each project.)
0. EXAMPLE PROJECT KEY
NUMBER
14
21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED
Sanitary Sewer Master Plan
El Portal, Florida
a. PROJECT OWNER
Village of El Portal
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
2017 2017
23.PROJECT OWNER'S INFORMATION
b. POINT OF CONTACT c. POINT OF CONTACT TELEPHONE NUMBER
Claudia V. Cubillos, Mayor (305)795 7880
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, sire, and cost}
The Sanitary Sewer Master Plan is a comprehensive report to define priority areas and determined corrective actions
required to convert from a decentralized wastewater treatment system (septic system) to a new sanitary sewer gravity
collection system with lift stations. The Master Plan also included a comprehensive survey base map for the entire village,
hydraulic sewer modeling and the overall design of eighteen phases of construction. The sanitary sewer systems were
developed using best management practices, current levels of service, and to investigate various funding sources. Total
cost for the project was $75,000. The estimated total costs of the village's sanitary sewer improvements were $23.84
Million. The project began in May 2016 and was completed in May 2017.
25 FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
a.Craig A. Smith &Boca Raton, Florida Prime
Associates, Inc.
(1) FIRM NAME (2) FIRM LOCATION (City and State} (3) ROLE
b.
(1) FIRM NAME (2) FIRM LOCATION (City and State} (3) ROLE
C.
179
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TE AM'S '
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
0. EXAMPLE PROJECT KEY
NUMBER
15
21. TITLE AND LOCATION (City and State!22.YEAR CO MPLETED
Stormwater Master Plan PROF ESSIONAL SERVICES CONSTRUCTION (If applicable!
Spring Lake Improvement District, Sebring, Florida 2006 2008
23.PROJECT OWNER'S INFORMATION
a. PROJECT OWNER b. POINT OF CONTACT
Joe DeCerbo
c.POINT OF CONTACT TELEPHONE NUMBER
Spring Lake Improvement
District
24. BRIEF DESCRIP TION OF PROJECT ANO RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
(863)655 1715
The primary objective of the project was to develop a comprehensive Stormwater Master Plan for Spring Lake
Improvement District. As part of the Master Plan, CAS prepared a Plan of Water Reclamation, modeled the conveyance
system, identified system deficiencies, made recommendations for improvements and updated construction cost estimates
for the proposed stormwater improvements. CAS filed and obtained a conceptual permit for improvements from SFWMD,
prepared a USDA funding application (FDEP 319 Grant) and assisted in obtaining state legislative appropriation. SLID
has begun acting on the Master Plan recommendations by implementing a 60-acre Stormwater Treatment Area. The total
project cost was $266,316. The project began in October 2006 and was completed in August 2008.
Stormwater Master Plan development, ICPR flood modeling, CIP development, aerial photogrammetry, treatment
alternatives, cost estimates and analysis, permitting and grant and appropriation assistance.
25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1)FIRM NAME (2) FIRM LOCATION (City and State} (3) ROLE
a.Craig A Smith &Boca Raton, Florida Prime
Associates, Inc.
(1)FIRM NAME (2)FIRM LOCATION (City and State} (3) ROLE
b.
(1)FIRM NAME (2)FIRM LOCATION (City and State} (3) ROLE
c.
88
G.KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS
26.NAMES OF KEY 27.ROLE IN THIS 28. EXAMPLE PROJECTS
PERSONNEL CONTRACT (Fill in "Example Projects Key" section below before completing table. Place
(From Section E, (From Section E, "X" under pro·ect ke number for artici ation in same or similar role.)
Block 12) Block 13) ,. : . I
Stephen C. Smith, P.E. Cont ract Director / X X X X X X X X X X
Project Manager
Orlando A. Rubio, P.E. Project Mana ger / X X X X X
Sr. Supervising
Engineer
Frank Vilar, P.E. Sr. Supervising X
Engineer
Greg Giarratana Sr. Super vising X X X
Engineer
Al Caruso, E.I. Project Engineer X X X X
Keith Schriner Project Engineer X X
Robert Keener, PSM Project Surveyor X X X X X X X X X X
James Driscoll Director of SUE X X X X X X X
Alan Lopez Locates Supervisor X
Tony Gomes Sr. Field Rep X X X X X X X
William Tanto Sr. Field Rep X X X X
Michael Marenco CADD Manager X X X X X X X X X X
29.EXAMPLE PROJECTS KEY
NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F)
City of Sunny Isles Beach Town of Pembroke Park
1 NE 174th Street Stormwater and Pavement 6 Sanitary Sewer Pump Station and
Improvements Forcemain Improvements
Town of Golden Beach City of Moore Haven
2 Capital Improvements Project Phase Ill & IV 7 Avenue R Stormwater Improvements
Stormwater Collection System with Master
Pump Stations
City of Miami Beach City of Sweetwater
3 Palm & Hibiscus Island Stormwater & 8 Stormwater & Pump Stati on
Roadway Improvements Improvements Phase IV
Hardee County Wauchula Hills Town of Pembroke Park
4 Water and Sanitary Sewer Improvements Ph 9 SW 52 nd Avenue (North) Roadway and
IV Drai nage Improvements
5 City of Margate 10 City of Pompano Beach
Lift Station No. 22 Rehabili tation SW 2 nd Street Drainage Improvements
I 26.NAMES OF KEY 27.ROLE IN THIS 28.EXAMPLE PROJECTS
PERSONNEL CONTRACT (Fill in "Example Projects Key" section below before completing table. Place
(From Section E, (From Section E, "X" under pro·ect ke number for partici ation in same or similar role.)
Block 12) Block 13) .
Stephen C. Smith, P.E. Contract Director / X X X X X
Project Manager
Orlando A. Rubio, P.E. Project Manager/ X X
Sr. Supervising
Engineer
Frank Vilar, P.E. Sr. Supervising
Engineer
Greg Giarratana Sr. Supervising X X X X
Engineer
Al Caruso, E.I. Project Engineer X X
Keith Schriner Project Engineer
Robert Keener, PSM Project Surveyor X X X X
James Driscoll Director of SUE X
Alan Lopez Locates Supervisor
Tony Gomes Sr. Field Rep X
William Tanto Sr. Field Rep X X
Michael Marenco GADD Manager X X X X
29.EXAMPLE PROJECTS KEY
NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F)
11 Miccosukee Tribe of Indians of Florida
Water Distribution System Improvements
12 Spring Lake Improvement District
Sto rmwater Pump Station Rehabilitati on
Glades County
13 Avenue L, M, N & 4th Sani tary Sewer
Improvements
14 Village of El Portal
Sanitary Sewer Master Plan
15 Spring Lake Improvement District
Stormwater Master Plan
33. NAME AND TITLE
Stephen C. Smith, P.E., President/CEO
H.ADDITIONAL INFORMATION
ARCHITECT-ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (if any)
RFQ 20-07-01 'PART II-GENERAL QUALIFICATIONS
(Ha firm has branch oHices, complste for 1111ch B!!!!?_lfic branch office BHklng_JIJ'!!.rk.J. 2a. FIRM (OR BRANCH OFFICE) NAME 3. YEAR ESTABLISHED 4. DUNS NUMBER
Craia A. Smith & Associates, Inc. 1980 03-86950292b. STREET 5. OWNERSHIP21045 Commercial Trail a. TYPE 2c. CITY 12d. STATE I 2e. ZIP CODE Corporation
Boca Raton FL 33486 b. SMALL BUSINESS STATUS 6a. POINT OF CONTACT NAME ANO TITLE N/A
Stephen C. Smith, P.E., President/CEO 7. NAME OF FIRM (If block 2a. is a branch office)
N/A6b. TELEPHONE NUMBER , 6c. E-MAIL ADDRESS
(561)314-4445 ssmith@craigasmith.com 8a. FORMER FIRM NAME(S) (If anv) 8b. YR ESTABLISHED 8c. DUNS NUMBER
t 9.EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL
AVERAGE RE VENUE FOR LAST 5 YEARSI c. No. of Employees c.Revenue a. Function a. Profile Index Code b. Discipline (1) FIRM (2) BRANCH Code b. Experience Number (see
below) 02 Administrative 7 C10 Commercial Buildinas 1 08 CADD Technical 3 C11 Commercial Facilities 1 12 Civil Enaineerina 7 C16 Construction Survev 3 15 Construction lnsoection 3 D04 Desian Buildina 1 42 Mechanical Enaineer 1 D05 Diaital Elevation 1 38 Land Survevor 6 D08 Dredaina 1 Utilitv Locators 14 E09 Environmental lmoact Studies 1 G04 GIS 1 C15 Construction Manaaement 3 HO? Hiahwavs/Streets 2 106 Drainaae 4 L02 Land Survevina 4 001 Office Buildinas 1 P05 Plannina 2 RO? Remote Sensina 1 R09 Recvclina 1 R11 Waterwavs 1 S07 Solid Waste 1 S10 Survev 4 S13 Stormwater Handling & Facilities 4
Other Emolovees T04 T ODO Survev & Mannina 3
Total 41 W03 Water Supply 3
11.ANNUAL AVERAGE PROFESSIONAL PROFESSIONAL SERVICES REVENUE INDEX NUMBER SERVICES REVENUES OF FIRM 1. Less than $100,000 6.$2 million to less than $5 million FOR LAST 3 YEARS
(Insert revenue index number shown at right) 2.$100,00 to less than $250,000 7.$5 million to less than $10 million
a. Federal Work 1 3.$250,000 to less than $500,000 8. $10 million to less than $25
b.Non-Federal Work 7 4.$500,000 to less than $1 million million
5.$1 million to less than $2 million 9. $25 million to less than $50
c.Total Work 7 million
10.$50 million or greater '12. AUTHORIZED REPRESENTATIVEI., a. SIGNATUR�.;:-� I _vu,� c. N AME AND Ti LE -
Ste�hen C. Smith, P.E.,�resident/CEO
The foreaoina is a statement of facts. I b. DATE
8/11/2020
Craig A. Smith & Associates, Inc.
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
ARCHITECT -ENGINEER QUALIFICATIONS
PART I-CONTRACT SPECIFIC QUALIFICATIONS
A. CONTRACT INFORMATION
1 TITLE AND LOCATION (C,ty and State/
2 PUBLIC NOTICE DATE 3 SOLICITATION OR PROJECT NUMBER
B. ARCHITECT-ENGINEER POINT OF CONTACT
4. NAME AND TITLE
Larry M. Smith, P.E./Presldent
5. NAME OF FIRM
Smith Engineering Consultants, Inc.
6. TELEPHONE NUMBER
(561) 616-3911
7. FAX NUMBER
(561)616-3912 8. E-MAIL ADDRESS
larry@smithengineeringconsultants.com
C.PROPOSED TEAM
(Comolete this.section for the orime contractor and all kev subcontractors.)
(Check) �i 'I §l 9.FIRM NAME 10.ADDRESS 11.ROLE IN THIS CONTRACTm, 0.. vl I I
Smith Engineering Consultants, Inc. 2161 Palm Beach Lakes Blvd., Suite 312 Electrical Engineering including West Palm Beach, FL 33409 Lighting Design
a. X
CHECK IF BRANCH OFFICE
b.
CHECK IF BRANCH OFFICE
c.
CHECK IF BRANCH OFFICE
d.
CHECK IF BRANCH OFFICE
e.
CHECK IF BRANCH OFFICE
f.
CHECK IF BRANCH OFFICE
D. ORGANIZATIONAL CHART OF PROPOSED TEAM (Attached)
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 {6/2004) PAGE 1.1
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Comolete one Section E for each key oerson.) 12.NAME 13.ROLE IN THIS CONTRACTElectrical Engineer 14.YEARS EXPERIENCE
Larry M. Smith, P.E.a.TOTAL
33 I b. WITH CURRENT FIRM20 15.FIRM NAME AND LOCATION (City and State)
Smith Engineering Consultants, Inc, 2161 Palm Beach Lakes Blvd., Suite 312, West Palm Beach, FL 33409
16.EDUCATION (DEGREE AND SPECIALIZATION)
Bachelor of Science in Electrical Engineering
17.CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
Florida/Electrical Engineer ing
18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
b.
d.
e.
Post-graduate studies at FAU in telecommunications, Tau Beta Pi (Engineering Honor Society), IEEE, Florida Engineering Society (PastPresident of the Palm Beach Chapter and State), Florida Building Code electrical technical advisory committee, FES state energy committee.
( 1) TIT LE AND LOCATION /City and State) ( 'it) ltf \\'l•:--t Palm lk·J�h Stri..·,.:1 l i�htill)-'. Wl·�t l',thll lk,11.:h. l"lornla
- . .
19. RELEVANT PROJECTS
.. . ..
(2) YEAR COMPLETED PROFE SSIONA L SERVICES CONSTRUCTION r·• A;,;,hca t1!<) 20 1') 201') . . . .-.. .
Designed the electrical systems, including new decorative lighting poles and fixtures, along Clematis Street in the 100 and 200 Blocks from Flagler Drive to Olive Avenue. The electrical systems included a new electrical service and power distribution for photoelectric controlled street lights, power pedestals and receptacles. Calculations for the roadway illumination were made in accordance with city requirements, and light pole details prepared for the selected decorative lighting. ( 1) TITLE AND LOCATION /City and St,,tei ( ·,1, of \\'1.''.'>I l\1!111 lh:;Kh �111.:1.:t I i1..:htme West Palm Beach. Florida . .
• • . . ..
(2) YEAR COMPLETED PR OFESSIONAL SERVICES CONSTl,UC TION ,,· ,t,,;: .. :.iblcJ201') 2021 . . -. . .-.
Designed the electrical systems, including new decorative lighting poles and fixtures, along Tamarind Avenue from Banyan Blvd. to Palm Beach Lakes Blvd. The electrical systems included a new electrical service and power distribution for photoelectric controlled street lights. Calculations for the roadway illumination were made in accordance with city requirements, and light pole details prepared for the selected decorative lighting. ( 1) TITLE AND LOC ATION /City ""ti Sidle/ ( '1ly ,,f \\'1.·:-.1 l';1l111 lk-;ll.:h Stn:1:1 l.i,!-!li tin � West Palm Beach. Flonda
BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE
(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION 1•1 A;,;•1c,1bic•I 2016 2017 ..-. -. . .
Designed the electrical systems, including new decorative lighting poles and fixtures, for the Loftin Place development along North Dixie Highway between 6th St. and Eucalyptus St. The electrical systems included a new electrical service an d power distribution for photoelectric controlled street lights. Calculations for the roadway illumination were made in accordance with city requirements, an d light pole details prepared for the selected decorative lighting. ( 1) TITLE AND LOCATION /City an<! Sw,·) ( 'it, of \\'c:-.t Palm B •• :ad1 { ·urm: ParJ... l111pio,1.·1111.:11b West Palm Beach. Florida
BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
(2) YEAR COMPLETED PROF ESSIONAL SERVICES CONSTRUCTION i" A;�!,cJb!d 20 17 201') .. -.-.-.
Designed the electrical systems, including new lighting poles and fixtures, for Currie Park along the lntracoastal Waterway. This additional lighting was installed to supplement the existing lighting throughout the park. LED type cobra head fixtures and aluminum poles were selected to match those existing throughout the park
( 1) TITLE AND LOCATION /City and State)C11y of\\'�sl P,:ilm lkad1 Str1,.•4,,:t l.i�htin� West Palm Beach, Flonda
BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE
(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (!! A11 pt,c,1bl,') 2014 2016 .. -. -. -.
Designed the electrical systems, including new decorative lighting poles and fixtures, for the sidewalks along Fem Street between Tamarind Avenue and South Olive Avenue. The electrical systems included a new electrical service and power distribution for photoelectric controlled street lights. Calculations for the roadway illumination were made in accordance with city requirements, and light pole details prepared for the selected decorative lighting.
ae ----E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
IComolete one Section E for each kev oerson.J 12.NAME 13.ROLE IN THIS CONTRACT
Electrical Engineer 14.YEARS EXPERIENCELuther E. Fair, P.E.a. TOTAL 40 I b. �ITH CURRENT FIRM
15.FIRM NAME AND LOCATION /Crtyand State/
Smith Engineering Consultants, Inc, 2161 Palm Beach Lakes Blvd., Suite 312 , West Palm Beach, FL 33409
16.EDUCATION (DEGREE AND SPECIALIZATION) 17.CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
Bachelor of Science in Electrical Engineering Florida/Electrical Engineering
18.OTHER PROFESSIONAL QUALIFICATIONS /Publications, Organizations, Training, Awards, etc./
b.
d.
Post-graduate studies at FAU in telecommunications, Tau Beta Pi (Engineering Honor Society), IEEE, Florida Engineering Society (Past
President of the Palm Beach Chapter and State), Florida Building Code electrical technical advisory committee, FES state energy committee,
Designed the electrical systems, including new decorative lighting poles and fixtures, along Clematis Street in the 100 and 200 Blocks from
Flagler Drive to Olive Avenue. The electrical systems included a new electrical service and power distribution for photoelectric controlled
street lights, power pedestals and receptacles. Calculations for the roadway illumination were made in accordance with city requirements,
and light pole details prepared for the selected decorative lighting.
Designed the electrical systems, including new decorative lighting poles and fixtures, along Tamarind Avenue from Banyan Blvd. to Palm
Beach Lakes Blvd, The electrical systems included a new electrical service and power distribution for photoelectric controlled street lights.
Calculations for the roadway illumination were made in accordance with city requirements, and light pole details prepared for the selected
decorative lighting,
( 1)TITLE AND LOCATION (C,ty ,1nd St.1tc) P(i:\ Bh d & ( ·1.:11t1al Bhd. l11h:r:--l'1,:t1 �,11 I i!,!hLnsPalm Beach Gardens. Flori da
(2) YEAR COMPLETEDPROFESSIONAL SERVICES CONSTRUCTION (ti At •p!,cavtc) ::io1s 20.::!1>
BRIEF DESCRIPTION (Brief scope, size, cost, ere.) AND SPECIFIC ROLE [X) Check if project performed with current firm
SEC was a sub-consultant for lighting design for the proposed construction of an intersection widening project at PGA Boulevard and
Central Blvd, in Palm Beach Gardens. We perfonned the intersection lighting analysis and photometric calculations for the intersection
widening and to accommodate pedestrian crossings to recently updated standards,
BRIEF DESCRIPTION /Brief scope, size, cost, etc./ AND SPECIFIC ROLE
Designed the electrical systems, including new lighting poles and fixtures, for Currie Park along the lntracoastal Waterway, This additional
lighting was installed to supplement the existing lighting throughout the park, LED type cobra head fixtures and aluminum poles were
selected to match those existing throughout the park
(1) TITLE AND LOCATION (City and State)
. . . ' I •
(2) YEAR COMPLETEDPROFESSIONAL SERV I CES CONSTRUCTION 111 A;,pt,cavte)
.. .. -.-.-.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, If not specified.
C S Ffi h . . .20. EXAMPLE PROJECT KEY
NUMBER
I
21 TI TL E AND LOCATION (C11y and SI Jlc) 22 YEAR COMP LETED
Cit) of\\ t:,t Palm [k.ich Ckm<tl h Strt:ch,apc lmp rm crnrnts PRO FESSIONA L SERVICES CONSTRUCTION (,f Appl icable) \\ ..:,t l'.!1111 lk ,1eh. rlorid,1
a. PROJECT OWNER
City of West Palm Beach
2019 201')
23.PROJECT OWNER'S INFORMATION
b. POINT OF CONT ACT NAME
Tinu Pena
c.POINT OF CONTACT TELEPHONE NUMBER
561-494-1051
24. BRIEF DESCRI PTION OF PROJECT AND RELEVANCE TO THIS CONTRACT {Include scope, size, and cost)
Designed the electrical systems, including new decorative lighting poles and fixtures, along Clematis Street in the I 00 and
200 Blocks from Flagler Drive to Olive Avenue. The electrical systems included a new electrical service and power
distribution for photoelectric controlled street lights, power pedestals and receptacles. Calculations for the roadway
illumination were made in accordance with city requirements, and light pole details prepared for the selected decorative
lighting.
Total Project Cost = $16,400,000
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FI RM NAME (2) FIRM LOCATION(C,1yandS1a1c) (3) ROLE
a. Smi th En gineer ing C(,nsultant,, \\'est Palm 13cach, 1'1(1rida Llcctrical Engin,:cring
Inc.
(1)FIRM NAME (2)FIRM LOCATION (City and State} (3) ROLE
b.
STANDARD FORM 330 (6/2004) PAGE 3.1
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATION S FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, If not specified. ' '
20. EXAMPLE PROJECT KEY
NUMBER
2
21 TI TLE AND LOCATION (C ,t, a•id Sta•c) 22 YEAR COMPLETED
City of \\"c,t P,ilm lkadi ·1 ,un,irind A,..: Str..:<.:t Lighting PROFESSIONAL SERVICES CONSTRUCTION (1f Applicable) \\"..:,t Palm B..:ad1. rlorid,1 2019 2021
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
City of West Palm Beach
b. POINT OF CONTACT NAME
Tinu Pena c. POINT OF CONTACT TELEPHONE NUMBER 561-494-105124. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
Smith Engineering Consultants, Inc. designed the electrical systems, including new decorative lighting poles and fixtures,
along Tamarind Avenue from Banyan Blvd. to Palm Beach Lakes Blvd. The electrical systems included a new electrical
service and power distribution for photoelectric controlled street lights. Calculations for the roadway illumination were
made in accordance with city requirements, and light pole details prepared for the selected decorative lighting.
Total Project Cost = $4,700,000
I.
j4.::"
,j . ---
I: ---�--.. .., -:�-1:1 I Ir·�
t'"JtfA�
.. t
IL.ICTitlCALMEI' IQTU.
{::....,_,,I•• l,1'U..J-"�·-·\.m..l
(:'o:.,,,tt.•,1""1.:4t••]<,.-I
(lr,GNf[RINGSEJMCe���1CI.D&ATlt$f_4TttRDQR•WPll,fl.U401•'1t(5&.1J4�•IU':$1)4t'-1111
-.. I g_
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (C,tyand State) (3) ROLE
a. Smith Engin..:..:ring Consult,rnts, W..:st Palm lkach, rlorida Ekctrical Lnginccring
Inc.
(1) FIRM NAME (2) FI RM LOCATION (City and State) (3) ROLE
b.
STANDARD FORM 330 (6/2004) PAGE 3.2
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, If not specified. . . 20. EXAMPLE PROJECT KEY
NUMBER 3 21 TITLE AND LOCATION (C,ty Jnd Sta'eJ 22 YE AR COMPLETED
Loftin Pl,1cc Strccbc,1pc lmprm emcnh PROFESS IONAL SERVICES CONSTRUCTION (1f Applicable) \\ est l\1l111 Bc <1ch, rlorida , 2016 2017
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
City of West Palm Beach
b. POINT OF CONTACT NAME
Laura Le c. POINT OF CONTACT TELEPHONE NUMBER
(561)822-130 0
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Designed the electrical systems, including new decorative lighting poles and fixtures, for the Loftin Place development along North Dixie Highway between 6th St. and Eucalyptus St. The electrical systems included a new electrical service and power distribution for photoelectric controlled street lights. Calculations for the roadway illumination were made in accordance with city requirements, and light pole details prepared for the selected decorative lighting. Total Project Cost = $479,000
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (C,tyand State) (3) ROLE
a. Smith Engineering Consultants, W..:st Palm Beach, Florida Uectri.:al l:ngincering
Inc.
(1) FIRM NAME (2) FIRM LOCATION /City and State) (3) ROLE
b.
STANDARD FORM 330 (6/2004) PAGE 3.3
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, If not specified. • •
20. EXAMPLE PROJECT KEY
NUMBER
4
21 TITLE AND LOC ATION (C,ry a, d Star,) 22 YEAR COMPLETED f-ern Street Streetscape lmpnl\ cmcnts PROFESSIONAL SERVI CES CONSTRUCTION (,f Applica ble) West Palm Beach, Florida
a. PROJECT OWNER
City of West Palm Beach
2014 201(1
23. PROJECT OWNER'S INFORMATION
b. PO INT OF CONTACT NAME
Laura Le
c. PO INT OF CONTACT TELEPHONE NUMBER
(561)822-1300
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTR ACT (Include scope, size, and cost)
Designed the electrical systems, including new decorative lighting poles and fixtures, for the sidewalks along Fern Street
between Tamarind Avenue and South Olive Avenue. The electrical systems included a new electrical service and power
distribution for photoelectric controlled street lights. Calculations for the roadway illumination were made in accordance
with city requirements, and light pole details prepared for the selected decorativ e lighting.
Total Project Cost = $634,000
25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
( 1) FIRM NAME (2) FIRM LOCATION (C,ty and Sr are) (3) ROLE
a.Smith Engineering Consultants,West Palm Bc,1ch, Florida Llcctrical Engineering
Inc.
STANDARD FORM 330 (6/2004) PAGE 3.4
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, If not specified. . . 20. EXAMPLE PROJECT KEY
NUMBER
5
21 TIT LE AND LOCATION (C,ty and State) 22 YEAR COMPLETED
PGA Bh d. & (\:ntral Bild. Intersection Lighting PROFESSIONAL S ERVICES CONSTRUCTION (1f Applicable)
P..ilm lk..ieh G.irden,, rlorida 1 _() 18 2020
a. PROJECT OWNER
FOOT
23. PROJECT OWNER'S INFORMATION
b. POINT OF CONTACT NAME
Bob Lawson
c. POINT OF CONTACT TELEPHONE NUMBER
5616977002
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
SEC was a sub-consultant for lighting design for the proposed construction of an intersection widening project at PGA
Boulevard and Central Bl vd. in Palm Beach Gardens. We performed the intersection lighting analysis and photometric
calculations for the intersection widening and to accommodate pedestrian crossings to recently updated standards.
Total Project Cost = $859,000 1-----
U�••c ·----------_!,_
25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (C,tyanaSta t,;) (3) ROLE
a. Smith Engineering Consultants, \\'c�t Palm Be,1eh, l'lorida Elc<:trical Engineering
Inc.
(1) FIRM NAME (2) FIRM LOCATION /City and State) (3) ROLE
b.
STANDARD FORM 330 (612004) PAGE 3.5
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFIC ATIONS FOR THIS CONTRACT
20. EXAMPLE PROJECT KEY
NUMBER
(Present as many projects as requested by the agency, or 10 projects, If not specified.
C t t S f Ffi h . t . . 6
21 TITLE AND LOCATION (C,ryand S1arc) 22 YEAR COMPLETED
Jupiter Tandem Truck !\irking L0t lmpnn C.:lllCllh PROFESSIONAL SERVICES CONSTRUCTION (,f Applicable) Jupiter. r-lorida 2010 2011
23.PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
Florida's Turnpike Enterprise
b. POINT OF CONTACT NAME
Jimmy Richie c. POINT OF CONTACT TELEPHONE NUMBER
561.472.8125
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
SEC was a sub-consultant for lighting design for the proposed improvements to the existing Tandem Truck Lot in Jupiter.
We prepared a lighting design analysis report to evaluate the existing lighting installation, and to present our
recommendations for modifications/add itions to the site lighting. We performed the site lighting design for the
modifications/additions to the entry and parking areas of the existing tandem truck lot.
Total Project Cost= $780,000
JT'Affl' Ol'FI.DIUDA
OIJPAIIT/llli..._T OI' ffA�TA 710N
�IIIIV•�•AL PRO.It.CT Q elf� I !;,l �
Hta,,';r(K, .vrl1LR IAltDt.11 l�..J( 1CI
111•�-"'-•·· ··-:.:;_.z ... --:'-L_:;:f�:·
-- ·-·-··· i
-····-··-··· .i -.. .,,,."....(V..,�� r;:;•,-·= J =,-_ ! 4:!:� .. �:� =-� --� ___ , .... ,_,.,_., -... -.•·
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (C,ry and Sratc) (3) ROLE
a. Smith Engineering Consultants, West Palm [kach, Florida Llectrical Engi neering
Inc.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
b.
STANDARD FORM 330 (612004) PAGE 3.6
U9 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, If not specified.
C I I S t' Ffi h . t . . 20. EXAMPLE PROJECT KEY
NUMBER
7
21 TITLE AND LOCATION (C•ty and S•a:c) 22 YEAR COMPLE TED
SE 5th A\ cnuc Strcctscapc I PROFESSIONAL SERVICES C ONSTRUCTION (,f Applicable) Dclr<1v 13cach. fL 1 -
l 200-l 2005
a. PROJECT OWNER
City of Delray Beach
23. PROJECT OWNER'S INFORMATION
b. POINT OF CONT ACT NAME
Dave Frodsham
c. POINT OF CONTACT TELEPHONE NUMBER
772. 781.3400
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
Smith Engineering Consultants, Inc. designed the electrical systems, including new decorative lighting poles and fixtures,
along SE 5th A venue. The electrical systems included a new electrical service and power for and photoelectric controlled
street lights. Also included were tree lighting for specific landscape improvements, and power receptacles for holiday
lighting of the trees. Calculations for the roadway illumination were made in accordance with city requirements, and light
pole details prepared to match the existing decorative lighting to the east. Total Project Cost = $643,000
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (Cilya nd State) (3) ROLE
a. Smith Engineering Consultants, \\'est l\1lm l3e<1ch, rlori<la I:lcctrical Enginee ring
lnc.
(1)FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
b.
STANDARD FORM 330 (612004) PAGE 3.7
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TE AM'S
QU ALIFICATIONS FOR THIS CO NTRACT
(Present as many projects as requested by the agency, or 10 projects, If not specified. . . 20. EXAMPLE PROJECT KEY
NUMBER
8
21 TITLE AND LOCATION (C,ty and State) 22 YEAR COMPLETED PG/\ Bh cJ.!SR 811 lnterd1angc and rl) cncr PROFESSIONAL S ERVICES CONSTRUCTION (1f Appl,cab le) Palm Bcac:h Garde,i-, f-lorida a. PROJECT OWNER
FOOT
i 200-1 2007
23. PROJECT OWNER'S INFORMATION
b. POINT OF CONT ACT NAME
Dana Gillettec. POINT OF CONTACT TELEPHONE NUMBER
561-753-972324. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
SEC developed the lighting design for the proposed construction of a SR 811 flyover bridge along PGA Blvd. in Palm
Beach Gardens. The project also included the construction of new on-ramps to 1-95 and a loop road. We performed the
lighting design for the installation of decorative light poles and fixtures across the PGA Blvd. bridge, and conventional
light poles and fixtures throughout the rest of the project.
Total Project Cost= $30,000,000
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (C,tyandState) (3) ROLE a.Smith Engineering Consultants,We,t Palm Beach, f-lorida Electrical [ngineering Inc.(1) FIRM NAME (2) FIRM LOCATION (C,tyand State) (3) ROLE
b.
STANDARD FORM 330 (6/2004) PAGE 3.8
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 1 O projects, If not specified. . . 20. EXAMPLE PROJECT KEY
NUMBER 9
21 TITLE AND LOCATION (C11yana Stale) 22 YEAR COMPLETED
I-75 \\'ukni ng. Atlantic to Boynton , PROFESSIONAL SERV ICES CONSTRUCTION (1f Applicable) 13rtlll ard County, rtond,1 , 2016 2018
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
Florida's Turnpike Enterprise
b. POINT OF CONTACT NAME
Nisar Khan
c. POINT OF CONTACT TELEPHONE NUMBER
561)753-9723
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT {Include scope, size, and cost)
A widening project to widen the existing 6-lane freeway to 8 lanes. Conven tional roadway lighting design for the project
in accordance with FDOT standards. Performed coordination with FPL for electric service, calculated voltage drop for
lighting circuit conductors, and designed the lighting plans and electric service point details.
Total Project Cost = $223,000,000
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCATION (C11yand Stale) (3) ROLE
a.Smith Eng ineering Consultanb,\Vest Palm Beach, Florida Electrical Engineering
Inc.
(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE
b.
STANDARD FORM 330 (6/2004) PAGE 3.9
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, If not specified.
C I S Ffi h . .20. EXAMPLE PROJECT KEY
NUMBER 10
21 T I TLE AND LOCATION (C,ty and State) 22 YEAR COMPLETED SR A I A. Roadii ay Jmpnl\ cm..:nh PROFESSIONAL SERVICES CONSTRUCTION (,f Applicable) Boca Raton. r:lorida 2005 2006
23. PROJECT OWNER'S INFORMATION
a. PROJECT OWNER
City of Boca Raton
b. POINT OF CONTACT NAME
Dana Gillette
c. POINT OF CONTACT TELEPHONE NUMBER
561)753-9723
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
Pole-mounted roadway lights are known to discourage turtle nesting and cause disorientation for hatchlings. Smith
Engineering's lighting designs incorporate alternative lighting design standards for environmentally sensitive coastal
areas in Florida that are now used statewide by FDOT and others working in coastal regions. Many light fixtures are
available with LED technology that provides color temperatures suitable for use in areas near the coastline. These help to
minimize the impact of lighting on the sea turtles and their hatchlings.
Total Project Cost = $3,900,000
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
(1) FIRM NAME (2) FIRM LOCA TION (C,tyand State) (3) ROLE
a.Smith Engineering Consultants.West Palm Beach, r:lorida Electrical Engineering
Inc.
(1) FIRM NAME (2) FIRM LOCATION /City and State) (3) ROLE
b.
STANDARD FORM 330 (6/2004) PAGE 3.10
ARCHITECT -ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (ff any)
PART 11-GENERAL QUALIFICATIONS
(If a firm has branch offices, complete for each specific branch office seeking work.)
2a. FIRM (OR BRANCH OFFICE) NAME
Smith Engineering Consultants, Inc.
2b. STREET
2161 Palm Beach Lakes Blvd., Suite 312
2c. CITY
West Palm Beach
2d. STATE
FL 33409
a. TYPE
Corporation
4. DUNS NUMBER
079572215
5. OWNERSHIP
b. SMALL BUSINESS STATUS_____ ,......,.......,......,....,.,.,..,,,..,.,.,.,,..,=.,,...------.i...----.i...------""'11 City ofWPB, Palm Beach County, SFWMD, 6a. POINT OF CONTACT NAME AND TITLE FOOT Broward Count CBE Larry M. Smith, P.E., President 7. NAME OF FIRM (llbioci< 2aisabranchofficaJ
6b. TELEPHONE NUMBER
(561) 616-3911
6c. E-MAIL ADDRESS
larry@smithengineeringconsultants.com
Sb. YR. ESTABLISHED Sc. DUNS NUMBER
9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND
ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS
a. Function b. DisciplineCode
02 Administrative
08 GADD Technician
21 Electrical Engineer
42 Mechanical Engineer
15 Construction Inspector
Other Employees
Total
11. ANNUAL AVERAGE PROFESSIONAL SERVICESREVENUES OF FIRM FOR LAST 3 YEARS /Insert revenue index number shown at right)
a. Federal Won<
b. Non-Federal Won<5
AUTHORIZED FOR LOCAL REPRODUCTION
c. No. of Employees (1)FIRM (2)BRANCH
4
2
0
9
a. Profile Code
A05
C18
003
E03
H04
L06
P07
P12
S13
A12
C04
B02
C08
C17
D04
F03
F05
S04
S07
H07
W03
R04
b. Experience
Airports; Navaids; Airport Lighting
Cost Estimating
Desalinization
Electrical Studies and Design
Heating; Ventilating; Air Conditioning
Lighting (Exteriors; Streets; Memorials;
Plumbing & Piping Design
Power Generation, Transmission, Dist.
Storm Water Handling & Facilities
Automation; Controls; Instrumentation
Chemical Processing & Storage
Bridges
Codes; Standards; Ordinances
Corrosion Control; Catholic Protection;
Design-Build -Preparation of Requests for
Fire Protection
Forensic Engineering
Sewage Collection, Treatment and Disposal
Solid Wastes; Incineration; Landfill
Highways; Streets; Airfield Paving; Parking
Water Supply; Treatment and Distribution
Recreation Facilities (Parks, Marinas, Etc.)
c. Revenue Index Number
(see below)
PROFESSIONAL SERVICES REVENUE INDEX NUMBER
1. Less than $100,000 6.$2 million to less than $5 million
2.$100,000 to less than $250,000 7. $5 million to less than $10 million
3. $250,000 to less than $500,000 8.$10 million to less than $25 million
4.$500,000 to less than $1 million 9.$25 million to less than $50 million
5.$1 million to less than $2 million 10. $50 million or greater
STANDARD FORM 330 (1/2004) PAGE 6
H.ADDITIONAL INFORMAITON
30.PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED .Smith Engineering Consultants, Inc. is a multi-discipline engineering firm with an in-depth knowledge of energy, water, telecommunications, and architectural projects. At SEC, we approach our business just as you do, focusing on our customers and the various environments in which they operate. SEC places a strong emphasis on creating productive working relationships with clients. Because we believe that teamwork is the key to success, our professionals are committed to responsive service, attention to detail, and effective communication and cooperation. Our staff has built a deserved reputation for completing assignments in a cost-effective and timely manner. We've accomplished this through innovative thinking, careful planning, and professionals who believe in quality and hard work. As Florida continues to experience tremendous growth, capital improvement projects will remain in the forefront of municipal infrastructure improvement efforts. The staff at Smith Engineering Consultants has played an important role in the design, construction, and renovation of facilities throughout the state. Our knowledge of facilities and agencies in the Tri-County area is particularly notable, due to our more than 30 years of experience here in south Florida. Public facilities require complex electrical and mechanical systems, including HY AC, plumbing, power, lighting, controls, instrumentation, and telemetry. You can tum to SEC for expertise in the design of these elements. Cost-effective design is the key to success for today's municipal infrastructure projects. Understanding that funding usually comes from a county or city's own tax base, our staff approach every design from a "Total Project" perspective. We will provide the most cost-effective and efficient design for the long term, always looking hard at the client's operation and maintenance costs. 31. SIGNATURE
33. NAME AND TITLELarry M. Smith, P.E./President
I. AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts.
32. DATE
08-10-20
STANDARD FORM 330 (6/2004) PAGE 5
E. RESU'.\IES OF KE\' PERSO:\NEL PROPOSED FOR l IIIS CO;\TR.\CT
(Complete one Sl'Clio n F. for cad, kc�· person.) 12. NAME 13. ROLE IN nns CONTRACT 14. YEARS EXPERIENCE Andrew Nixon, P.E. Senior Geotechnical Engineer a. TOTAL b. WITH CURRENT FIRM 15 5 IS. FIR,\.1 NAME AND LOCATION (Ciryand State) RADISE International, L.C., Riviera Beach, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) 117. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) B.S., Ocean Engineering, Florida Atlantic University, 2005 Professional Engineer, Florida No. 71458
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, A•urds, etc.) OSHA 40-hour Health and Safety / OSHA, 29 CFR 1919 .120 (HAZWOPER)
Qualified Stormwater Management Inspector, Inspector# 27919
Florida Engineering Leadership Institute Alumni, 2015
Florida Engineering Society Member (FES), National Society of Professional Engineers Member (NSPE) &American Society of
Civil Engineers
a.
b.
c.
d.
e.
19.RELEVANT PROJECTS( I) TITLE AND LOCATION (City and State ) (2) YEAR COMPLETED City of West Palm Beach North Shore Drive Pedestrian Bridge,PROFESSIONAL SERVICES CONSTRUCTION (if applicable) Palm Beach County, Florida 2018 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 0 Check if project paformed wilh curren1 finn
Senior Project Engineer -Provided geotechnical engineering services for the design of a pedestrian bridge on the west side of
the existing vehicular bridge over the Carver Canal. The pedestrian bridge is clear span bridge (spanning approximately 114
feet). Foundation recommendations were provided for 14 and 18-inch Precast Prestressed Concrete (PPC) piles, and 14 and 18
inch Auger Cast-In-Place (ACIP) piles.(I) TITLE AND LOCA TJON (Ciry and State ) (2) YEAR COMPLETED FDOT Design Services for 1-95 at Boynton Beach Boulevard PROFESSIONAL SERVICES CONSTRUCTION (if applicable) Interchange, Palm Beach County, Florida 2018 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE O Check if project paformcd wilh current furn Senior Project Engineer-Provided geotechnical engineering services for the widening of Bridge #930289 over the SFRC/CSX
Railroad, the widening of Bridge #930285 over I-95, and the retaining walls proposed for the widening of the bridge approaches
and interchange access/egress ramps.(1) TITLE AND LOCATION (Ciryand State} (2) YEAR COMPLETED Prosperity Farms Road over SFWMD C-17 Canal Bridge PROFESSIONAL SERVICES Replacement, Palm Beach County, FL 2019-0ngoing (3) B.RIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 181 Check if project pafonned wilh current furn Principal Geotechnical Engineer. Identified the thickness and composition of the existing pavement section, estimated Structural
Numbers for the existing pavement, provided detailed graphical logs of the borings showing the groundwater and soil
classifications, identified structures of concern in order to develop the Vibration Monitoring Requirements, and developed
milling and resurfacing recommendations. (I) TITLE AND LOCATION (Ciry and Slate} (2) YEAR COMPLETED Yamato Road from Lakeridge Boulevard to West of Florida's PROFESSIONAL SERVICES Turnpike Palm Beach County Florida 2018-2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 181 Check if project performed wilh current firm Senior Geotechnical Engineer. Provided a Geotechnical Engineering Services Report that identified the anticipated soil profile
and the anticipated subsurface conditions within the depth of pavement wheel loading influence along the roadway; assessed
the site preparation requirements and engineering criteria for placement and compaction of approved fill materials; and
identified appropriate design and/or construction considerations based on the soil and groundwater conditions encountered in
the borings.(1) TITLE AND LOCATION (Ciryand State) (2) YEAR COMPLETED Hood Road, East of Florida's Turnpike to W. of Central PROFESSIONAL SERVICES Boulevard and Hood Road & Central Boulevard Improvements, January 2018 -July 2019
Jupiter, Florida (3) BRIEF DESCRJPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 181 Check if project performed wilh current firm
Principal Geotechnical Engineer. Performed field inspections, in situ compaction tests, sample collection and required
Laboratory testing inclusive of material classification, in situ moisture content, organic content, gradational analysis and
Atterberg limits performed on soil samples
E. RESl/i\lES or KEY PERSONNEL PIWPOS[D roR TIIIS COl\TR.\CT
(ComplNc one Section E for each kc� person.)
12. NAME 13. ROLE rN THIS CONTRACT 14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM
Gregory J. Stelmack, P. E CEJ Lead/ Principal Geotechnical 28 6 Engineer
15. FIRM NAME AND LOCATION (City and Star,) RADISE International. LC, Riviera Beach, FL
16. EDUCATION (DEGREE AND SPECULIZ.ATJON) 17. CURRENT PROFESSIONAL REGISTRATION (ST ATE AND DISC/PU NE)
BS in Civil Engineering -University of Wisconsin, Madison 1989 •Registered Professional Engineer, Florida #70556 (2009)
•CTQP Drilled Shaft Inspection
•CTQP Pile Driving Inspection
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organiz.ations. Training. AK<mis. ,ic.) Mr. Stelmack is a seasoned Project Manager skilled in providing construction materials testing and engineering inspection testing
services including quality assurance/quality control for a wide variety of commercial, transportation, water resources, industrial, retail
and institutional projects. He specializes in providing design recommendations for deep and shallow foundation systems for a variety
of project types. He has worked on major projects throughout Florida and served as Project Manager and Senior Geotechnical
Engineer on numerous projects for private and public clients including Cities, Counties, School Districts, FDOT, USACE and SFWMD. 19. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Palm Beach County Construction Materials Testing, Geotechnical PROFESSIONAL SERVICES CONSTRUCTION (if applicable) Engineering & Inspection Annual Services Contract, Palm Beach Ongoing
County, FL
a. Principal Geotechnical Engineer. Construction inspection and lab and field materials testing services including the demolition of
existing Culverts and placement of new cast-in-place concrete culvert structures with gates and control systems and restoring the
embankment, demolition of existing Culverts, the reconstruction of new structures and rehabilitation structure replacements.
Also provided quality control services during concrete placement and casting of the building components. Services included a
substantial role in inspection and oversight of earthwork tasks.
(I) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Utility Special District Annual Consulting Engineer Inspection PROFESSIONAL SERVICES CONSTRUCTION (if applicable) Services, Riviera Beach, Palm Beach County, FL 2018 -Present
b. (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE 181 Check if project performed with current finn CEI Administrator. Providing Construction Management and/or Inspection Services assisting in the implementation of its newly
created Water/Wastewater Master Plan which defines the short-and long-range planning needs, operational and maintenance
issues that impact the CRBUSD
(I) TITLE AND LOCATION (City and Slate) (2) YEAR COMPLETED North Dade Optimist Park Community Recreation Center PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2014 Miami-Dade County, FL c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.} AND SPECIFIC ROLE 181 Check if project perfonned with current finn
Project Manager and Engineer of Record. Provided Inspection and Testing Laboratory Services for the construction of a
community recreation center facility.
(I) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Water and Sanitary Sewer System improvements for Utility PROFESSIONAL SERVICES CONSTRUCTION (if applicable) Analysis Zones 110/111 and 113 (VAZ 110/111, VAZ 113A and 2017- Present
VAZ 113B, City of Fort Lauderdale, FL d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.} AND SPECIFIC ROLE 181 Check if project perfonned with current fum CEI Administrator: Providing construction engineering inspector (CEI) for the attending pre-construction conferences, progress
meetings and other project, Conducting on-site observations/verification of the construction in progress (including specialized
field tests) to assist in determining if construction is proceeding in substantial accordance with the Contract Documents,
Maintaining a set of "as-built" drawings with notes and annotations based on inspector's observations.
E.RESlll\lES OF 1-:EY PERS0�1''EI, PROPOSED FOR THIS CO:\TR.\CT
(Complrtr onr Srrtion E for rarh kr_,. prrson.)
12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
a. TOTAL b. WITH CURRENT FIRM Akash Bissoon, P.E. Sr. Geotecbnical Engineer 14 s
15. FIRM NAME AND LOCATION (City and Stale)
RADISE International, LC, Riviera Beach, FL
16. EDUCATION (DEGREE AND SPECIAL/l.ATION) 17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE)
B.S., Civil Engineering, Florida Atlantic University, Boca Raton,Professional Engineer, Florida No. 74582; CTQP Quality
Florida Control Manager; CTQP Construction Engineering Inspector
Level 2; Florida Department of Environmental Protection
Qualified Storm Water Management Inspector,
#16155
18. OTIIER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.}
Mr. Bissoon's experience includes providing project management for FDOT projects and a wide range of work involving geotechnical,
environmental and civil engineering. He is skilled in the preparation of specifications for roadway work, storm water management
systems and water distribution systems. He is knowledgeable in current ASTM and AASHTO standards applicable materials testing
and is skilled at conducting materials investigations through the construction completion-certification stage. He has served as a Senior
Geotechnical Engineer on projects for clients including FDOT Broward County Aviation Department, SFWMD and USACE.
I 9. RELEVANT PROJECTS
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED North Dade Optimist Park Community Recreation Center PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2014
a. Miami-Dade County, FL
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE l!ll Oieck if project performed with current finn Geotechnical Engineer/Inspector. Provided Inspection and Testing Laboratory Services for the construction of a community
recreation center facility.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED FLL Site Prep and NA V AIDS Runway 9R-27L, Broward County, PROFESSIONAL SERVICES CONSTRUCTION (if applicable) FL 2014
b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE l!ll Oieck if project performed with current firm Senior Geotechnical Engineer. Construction Materials Testing Services including inspection and quality control. Performed soils
testing for embankment, subgrade, base course and drainage components; concrete monitoring and testing; asphalt monitoring and
testing; and vibration monitoring services. Estimated 140 days for sampling and field testing of the earthwork components.
(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Geotechnical Engineering & Materials Testing Continuing Services PROFESSIONAL SERVICES CONSTRUCTION (if applicable) Contract, FDOT D4/6, Palm Beach, Broward & Miami-Dade Ongoing Ongoing c. Counties, FL
(3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE l!ll Check if project performed with current fmn Senior Geotechnical Engineer. As Prime Consultant for this ongoing contract, the work includes providing districtwide materials
field and lab testing services.
(I) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Stormwater Treatment Area (STA) 1 West Expansion Area 2, Palm PROFESSIONAL SERVICES CONSTRUCTION (if applicable) Beach County, FL 2018 -2020
d. (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc.) AND SPECIFIC ROLE l!ll Oieck if project pcrfonned with current furn Senior Geotechnical Engineer. Geotechnical Engineering Services include an initial exploration of the subsurface conditions
within the project area in order to provide preliminary geotechnical data and engineering information required to develop the
design of the ST A. The scope of work included field exploration and sampling, well installation and permeability tests, laboratory
tests and geotechnical data compilations.
Craig A. Smith & Associates, Inc.
SECTION E4 -WORKLOAD
& STAFF AVAILABILITY
PROJECTED WORKLOAD
CLIENT PROJECT PERCENTAGE COMPLETE
DESIGN CONSTRUCTION
City of Belle Glade Torry Island Boardwalk, Seawall & Docks 100% 0%
City of Belle Glade SCOP Resurfacing Projects -Funding 100% 10% Assistance Applications (13 streets)
City of Delray Beach NW Neighborhood Improvements 15% 0%
City of Lake Worth Beach Lake Osborne Estates Water Main 100% 25% Improvements
City of Margate Station #7 Conversion 100%
City of Margate Replace Existing WWTP Triplex Station 100% 0% & Dumping Station
City of Margate Water Main Replacement & Upsizing in 100% 50% Residential Neighborhoods
City of Oakland Park Cherry Creek 0% 0%
City of Pompano Beach SW 2nd Street Drainage Improvements 100% 0%
City of Pompano Beach Non Sewer Area C Engineering Design 100% Report
City of Pompano Beach 14th St. & US 1 Drainage Improvements 30% 0%
City of Pompano Beach Non Sewer Area C Sanitary Sewer 60% 0% Improvements
City of Pompano Beach NW 16th Lane Drainage Improvements 5% 0%
Florida Department of Statewide 3D Radar Tomography Support 30% Transportation
Glades County Washington Park Sewer Improvements (LS 100% 0% &FM)
Hardee County Wauchula Hills Phase 5.0 -Residential 100% 20% Sanitary Sewer
Hardee County Wauchula Hills Phase 6.0 -Residential 100% 0% Water Main Extension
Hazen & Sawyer Palm Beach East Central Regional 100% Treatment Plant Radar Scan & Survey
Indian Trail Improvement Acreage Community Park 100% 90% District
Indian Trail Improvement 1401h Avenue North Roadway 100% 0% District Improvements
KO Construction of Florida, Titusville Boundary Survey 100% Inc.
Kimley Horn & Associates Delray Beach Lowson Boulevard 95% Improvements (Survey)
Mlccosukee Tribe of Indians Water Main Replacement 100% 0% of Florida
Old Saybrook Golf Capitol Fairway Memorial Gardens Cemetery 90% (Survey)
Spring Lake Improvement Stormwater Treatment Area Phase 2 -40%
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
� Craig A. Smith & Associates, Inc.
SECTION E4 -WORKLOAD
& STAFF AVAILABILITY Engineers • Surveyors • Subsurface Utility Engineering
30 Subsurface Imaging• Utility Coordination
District Flow Diversion Weir
Indian Trait Improvement 140th Avenue North Roadway
District Improvements 100% 0%
Indian Trait Improvement Acreage Community Park Expansion South 100% 65% District -Phase I
Spring Lake Improvement Design & Build New WWTP 100% District
Sunshine Water Control West Outfall Canal Widening 100% District
Sunshine Water Control Coral Springs Drive Bridge Canal Widening 100% District
Town of Pembroke Park Meekins Lake Stormwater Analysis 100%
Town of Pembroke Park SW 25th Street Stormwater Improvements 100% Phase I
Sun-N-Lake Improvement WTP Process Instrumentation and Controls 100% District (Sebring) Uoi!rades
CURRENT MUNICIPAL CLIENTS (MULTI-YEAR CONTRACTS)
City of Belle Glade (Since 2013) Hardee County (Since 1999)
City of Lauderhill (Since 2013) City of Margate (Since 1988)
City of Moore Haven (Since 1995) City of Sunny Isles Beach (Since 2013)
City of Sweetwater (Since 2000) Glades County (Since 1993)
Indian Trail Improvement District (2003-2007, 2014 to Date)
5%
N/A
0%
0%
0%
0%
CCPWA Utility Authority (Since 1994) Spring Lake Improvement District (Since 2001)
Town of Golden Beach (Since 2000) Town of Pembroke Park (Since 1.987)
Village of Biscayne Park (Since 2013) Village of El Portal (Since 2003)
Sunshine Water Control District (Since 2015) City of Pompano Beach (Since 201.5)
Sun "N" Lake Water Control District (Since 2017) City of Lake Worth (Since 2018)
TEAM'S COMMITMENT & STAFF AVAILABILITY
For the requirements of this contract, the CAS Management Team will assign responsibilities to survey
crews, utility locating crews, staff engineers, subconsultants, construction management and supporting
staff as needed for each assigned project. All staff members involved with an assigned project will be
provided with the proper equipment and tools to perform the assign work. CAS is con fident that it
maintains adequate staff and staff availability to perform the work assigned and is able to increase
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
Craig A. Smith & Associates, Inc.
Engineers • Surveyors • Subsurface Utility Engineering
3D Subsurface Imaging • Utility Coordination
SECTION E4 -WORKLOAD
& STAFF AVAILABILITY
staff as needed, due to its team experience, capacity and reputation in the industry. The CAS Team is
ready to allocate the necessary staff and resources and to work with the City in accomplishing its goals
as per contract requirements. We are committed to the City and will strive to continue to give excellent
service in the survey, design and construction management services for assigned capital improvement
projects on an as-needed basis.
CAS STAFF AND KEY MEMBERS PROJECTED PERCENT AVAILABILITY FOR nus CONTRACT BASED ON
CURRENT WORKLOAD
Name of Staff Year 202�2022 Year 2023-2025
Stephen C. Smith, P.E. * 15% 15%
William H. Landis, P.E. 30% 30%
Frank VIiar, P.E. * 50% 50%
Orlando Rubio, P.E. * 35% 35%
Greg Glarratana* 40% 40%
Keith Schriner* 35% 40%
Al Caruso* 50% 55%
Robert Keener, P.S.M.* 40% 50%
Donald Drake 50% 50%
David Lookabill 50% 50%
James Driscoll* 30% 30%
Alan Lonez* 30% 30%
Mlchael Marenco* 30% 30%
Miguel Rodrigues 40% 40%
Michael LaVella 45% 55%
Tony Gomes* 60% 60%
WIiiiam Tanto* 50% 50%
Michael Jones 15% 15%
*Key Project Members
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
Craig A. Smith & Associates, Inc.
SECTION E4 -WORKLOAD .
& STAFF AVAILABILITY
SUBCONSULTANT KEY STAFF MEMBERS PROJECT PERCENT AVAILABILITY FOR THIS
CONTRACT BASED ON CURRENT WORKLOAD
Name of Staff Year2020 Year 2021-2022
Marcus Unterweger, P.E. (MUEngtneers) 5% 5%
Ricardo Madriz (MUEngtneers) 5% 5%
Larry Smith, P.E. (Smith EnJ!lneerlng Consultants) 66% 75%
Luther E. Fair, P.E. (Smith Engineering Consultants) 70% 80%
Greeorv J. Stelmack, P.E. (Radlse International) 50% 50%
Andrew Nixon, P.E. (Radlse International) 50% 50%
Akash Blssoon, P.E. (Radlse International) 50% 50%
Jose LoDez, P.E., PMP (Bermello AJamll & Partners) 60% 60%
21045 Commercial Trail, Boca Raton, FL 33486 • Ph: 561-314-4445 • www.craigasmith.com • LB3110
Alexander Diaz
Town Manager August 31, 2018 TOWN OF GOLDEN BEACH
One Golden Beach Drive, Golden Beach, FL 33160 Office(305)932-0744 • Fax(305)933-3825
www.goldenbeach.us
RE: LEITER OF RECOMMENDATION To Whom It May Concern: This letter is on behalf of Craig A. Smith & Associates (CAS). The Town of Golden Beach has been working with Craig A. Smith & Associates since 2000. Over the past 18 years, Craig A.Smith & Associates has provided surveying, engineering, construction management andutility locating services on various stormwater, utility and roadway improvement projects.CAS also serves the Town in the capacity of Town Engineer.For over the past 18 years, The Town of Golden Beach has found CAS to be extremely effective in accomplishing the scope of service which has been their responsibility on numerous projects. I therefore recommend them highly for work. Respectfully, Alexander Diaz Town Manager
t)illage of Cl Portal
AugU$t�7, 2018
soo Northeast 87th Street
El Ponal, Florida 33 J3&,3S J 7
�lephone (305) 795-7880
FaX (305) 79S-7884-
RE: LETTER OF RECOMMENPATION
To Whom It May Concern,
This letter is on behalf of Craig A. Smith & Associates (CAS). The Vllla1e has been worting with
Cr-alg A. S,nlth & Associates since 2002.
(;)¥er the past 15 years, Craig A. Smith & Associates has provided surveying, engineering,
construction management and ut�lity ·1ocatin.1 services on various stormwater, utility and
roadway improvement projects. CAS also serves the Village In the capacity of Village Engineer.
For qver th� past 15 years The Village of El Portal has found CAS to be extremely-effective and
efficient in .accomplishing the scope Qf service, which has been their responsibility oq numerous
projects. Most of which these projects .ari? multifaceted, yet when wortir-s with CAS, they
always have,infor-m1t:ion readily avaii.tite, explaln with ease to administration and co1,1ndl, all of
which allows for;a. better understanding frGm us and allows us to reach timely declsions.
A Municipal Corporation since September 11, 1945
110 Or. Martin Luther King, Jr. Boulevard West Belle Glade, FL 33430
Tel: 561-992-1601
Fax: 561-992-2221
www.beffegladegoy.mm
Commissioners
Steve B. Wilson
Mayor
Mary Ross Wilkerson
Vice Mayor
Michael C. Martin
Treasurer
Johnny Burroughs, Jr.
Larry Underwood
Lomax Harrelle
Oty Manager
City of Belle Glade
Office of the City Manager
March 1, 2019
RE: LETTER OF RECOMMENDATION
To Whom It May Concern:
This letter is on behalf of Craig A. Smith & Associates (CAS). The
City of Belle Glade has been working with Craig A. Smith &
Associates since 2013. Over the past 5 years, Craig A. Smith &
Associates has provided surveying, engineering, construction
management and utility locating services on various stormwater,
utility and roadway improvement projects. CAS also currently serves
the city in the cap acity of City Engineer.
For over the past 5 years, the City of Belle Glade has found CAS to be
extremely effective in accompli shing the scope of service which has
been their responsibility on numerous projects. Most of these projects
are multifaceted and complex, yet when working with CAS, they
always have information readily available and explain with ease to
City administration and our Commission, all of which allows for a
better understanding from us and allows us to reach timely decisions.
I therefore recommend them highly for work.
Sincerely,
oc�/�
Harrelle
August 14, 2013
Lake Sebring,
Phone
www.sprlnglakefl.com
RE: LETTER OF RECOMMENDATION
To Whom It May Concem,
This letter is on behalf Craig A Smith Associates. Spring Lake Improvement District has been working with Craig A Smith Aaaociates since 2004. Over the past 9 years, Craig A. Smith & Associates has provided surveying, engineering, construction management and utility
locate services on various projects involving stonnwater, and road Improvements.
Craig A. Smith Associates also services the District In the capacity as District Engineer.
For over 9 years, SLID has enjoyed a successful relationship with Craig A. Smith & Associates, and highly recommends Craig A. Smith & Associates for Engineering, Surveying and Utility
Locate Services.
If you have any questions please feel free to contact our office.
Sincerely,
Brian Acker Chairman, Board of Supervisors
*KEY CAS STAFF ARE HIGHLIGHTED IN YELLOW*SUBCONSULTANTS ARE HIGHLIGHTED IN GREEN