Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BEA Architects, Inc.
City of Sunny Isles BeachContinuing Professional Consulting Services (CCNA)RFQ No. 20-07-01Purchasing / Procurement18070 Collins AvenueSunny Isles Beach, FL 33160 August 18, 2020BEA Architects, Inc.Bruno-Elias Ramos, Principal-in-Charge3075 NW South River Drive, Miami, FL 33142E-mail: beamarketing@beai.com T: 305.461.2053 2 5 Cover Letter 7 Workload 8 Certified Minority Business TAB 1 Cover Letter & Executive Summary TAB 2 Project Approach & Understanding 10 Project Approach TABLE OF CONTENTS TAB 3 Qualification Information & Assigned Personnel 15 Firm Profile 16 Form SF330 Part I 35 Form SF330 Part II 36 Licenses & Certifications TAB 4 Firm References and Similar Work Completed 57 Firm’s Experience & Qualifications 58 Organizational Chart 59 Resumes 99 Previous Experience TAB 5 Corporate Standing & Authorized Signatory 132 State Certificate 3 135 Respondent Submittal Form 136 Acknowledgment of Addenda 137 Required Forms 138 Acknowledgment of Addenda 139 Respondent Submittal Form 141 Non-Collusion Affidavit 142 Public Entity Crimes 144 Equal Opportunity / Affirmative Action 145 Conflict of Interest 146 Dispute Disclosure 147 Anti-Kickback 148 Contractor Anti-Boycott Certification 149 Addenda 157 Insurance TAB 6 Forms & Attachments TABLE OF CONTENTS TAB 1 Cover Letter & Executive Summary 5 Dear Selection Committee, It is with great pleasure that we submit our professional qualifications for the Continuing Professional Consulting Services (CCNA) for the City of Sunny Isles Beach, Florida. Founded in 2000 by Mr. Bruno-Elias Ramos, BEA Architects provides you with an experienced team of professionals that offer complete Architectural and Engineering Services, including but not limited to Design, Facility Assessments, Master Planning, Construction Documents, Cost Estimating, Scheduling, Bidding Assistance, Permitting, and Construction Administration, as well as a genuine and firm commitment to keeping quality, budget and scheduling needs as a top priority. Headquartered in Miami, FL, BEA Architects has over 25 years of experience and has worked closely with public and governmental facilities on numerous Professional Continuing Contracts from conception to completion, such as, Miami Beach City Hall Interior Renovations, MoCA Courtyard Improvements, North Shore Tennis Center, Long Key Transfer Station Repairs, City of Miami Beach City Hall Evac Plan, Miami Beach Bandshell Park, PortMiami, Port Everglades, and more. BEA has an outstanding record of successful completion of over 20 Continuing Services Contracts with different cities, organizations and municipalities, in the past 10 years, such as, the City of Miami Beach, PortMiami, City of North Miami, City of Opa-Locka, City of Miami Gardens, City of Homestead, Miami-Dade Parks & Recreation, Miami Dade Aviation Department, Miami-Dade County Public Schools, City of West Palm Beach, City of Fort Lauderdale, City oh Hialeah, Port of West Palm Beach, Port Everglades Broward County, Port of Tampa, Port Canaveral, Florida Atlantic University, and Florida International University. Led by BEA’s Principal-in-Charge and Project Manager Bruno-Elias Ramos, AIA, GC, LEED AP, all of our highly qualified experts are committed to design excellence through innovation and the unequivocal drive to exceed our client’s expectations and requirements. BEA is proud to have an experienced in-house team, that fully understand the City’s background, as well as its communal environments and will tailor each project under this contract to meet current and future needs. This team will serve to guarantee a successful relationship with the City and will work efficiently to convey an impressive, state-of-the-art and first-class image of the City. Our team, each excelling in their own discipline, will provide support in Civil Engineering, Leak Detection Studies, and Construction Engineering and Inspection (CEI) Services by Nova Consulting, Inc.; Electrical, Mechanical, HVAC and Plumbing Engineering by Hammond & Associates, Inc.; Surveying and Mapping Services by Premiere Design Solutions, Inc.; Geotechnical Engineering and Materials Sampling and Testing by Universal Engineering Sciences; Structural Engineering Services by PMM Consulting; and Environmental Engineering and Sea Level Rise Consulting Services by Coastal International Systems, Inc. The BEA team fully understands the importance of this contract and scope of services that will ultimately support the City of Sunny Isles Beach and their desire to contract professional architectural services on an “as-needed basis” to improve the City’s facilities, services and community. Considering the project’s scope and length of contract, the City of Sunny Isles Beach will need a resilient team with not only governmental and public works project experience, but also a team with a diverse portfolio that can add value and a new creative approach to future projects. BEA is known for its innovative ideas, and is also world-renowned for its state-of-the-art port and cruise terminal designs. BEA will provide general consultation for recommendations for improvements or operations of municipal lands, buildings and structures, utilities and roads, as well as development analysis, alternative analysis on existing building, project design, cost estimates, project planning, preliminary studies, drawings and specifications, and any other services assigned by the City that will reflect the City’s environment while inspiring staff, residents and visitors. We take into consideration the City’s schedules and budget, as well as other plans so that other ongoing projects do not interfere with current schedules, neighborhoods, programs and events. Additionally, BEA will take into account the impacts of the COVID-19 Pandemic and will take the necessary precautions to avoid health risks of our team and City Staff. Because BEA understands how this pandemic affects current and future designs, planning and constructions, we will implement the new regulations made by the City to our work so that the community can move to a “New Normal”. The BEA team will have a strong and clear communication with the City’s staff, despite the possibility of not having face-to-face meetings and will implement protocols executed by the City and the County into its design. BEA knows how vital these services are for the City of Sunny Isles Beach and the success of its governmental and recreational programs. Our firm is willing to meet any location, budget, or task orders that get assigned to us. Our team provides you with a cohesive group of architecture and engineer professionals that will provide a full program that will significantly support the City in obtaining new facilities, building renovations, building additions, roadways, parking areas, new recreational facilities, Cover Letter 6 Cover Letter including parks, community centers, and other vertical construction needs. Our in-house team of experts will provide complete Architectural Services, including Study Phase, Design, Plan Review, Cost Estimating, Interior Design, Space Planning and Constructions Phase Services, as well as Conceptual Plans, Master Planning, Structural Engineering Design, Technical Specifications, Construction Documents, Bidding, Construction Administration, On-Site Representation, among other services the City may request. Our team is knowledgeable of all current rules and regulations of Local, State, and Federal agencies that regulate the environment, land use, and building code provisions. The heart of our practice is its multiple design studio environments where the full range of BEA’s skills, technology, and creativity is concentrated to develop dynamic concepts that address every challenge of a project. Over two decades of high-profile architecture, design, planning, urban design, interior design, permitting, construction administration and construction management experience culminate in a portfolio of satisfied clients, which include public and governmental works, municipalities, community centers, corporate, performing arts, recreational centers, marinas, transportation, parks, educational facilities, ports, maritime and seaport entities, high-end residential, hospitality, food and beverage, religious and retail organizations. Additionally, BEA Architects and its LEED accredited professionals are known for the incorporation of sustainable design systems and processes. BEA Architects plans to incorporate this philosophy of sustainable innovation into the design of this contract in a new and exciting way, and will work closely with the City of Sunny Isles Beach to analyze the possibility of achieving a higher level of certification. BEA Architects is also a Minority Business Enterprise Certified firm and represents a diversified group of professionals with an impeccable reputation for service. We believe the talent, hard work and experience of our team will allow us to reach and exceed the requirements set forth in your solicitation. Our goal is to improve the overall experience, functionality and efficiency of the facilities so that the City can enhance its programs for the community. We express our sincerest interest and commitment in pursuing this project and performing the work in accordance with the terms of the response. Our team looks forward to this exciting opportunity with the City of Sunny Isles Beach. Respectfully submitted, BEA Architects, Inc. Bruno-Elias Ramos, AIA, GC, LEED APPrincipal-in-Charge, Project Manager3075 NW South River Drive, Miami, FL 33142(305) 461-2053ber@beai.com, beamarketing@beai.com 7 Workload BEA Architects manages each project differently depending on the client’s needs and goals. BEA distributes the work among its teams, which are equipped to handle multiple jobs without affecting the flow or the ability to meet deadlines. Based on an assessment of our current workload, BEA has sufficient staff and capacity available to immediately assign the designated team to undertake and proceed with the project tasks. BEA assigns a project team led by the Principal-In-Charge as Project Manager. BEA has taken into account the current COVID-19 Pandemic and has been capable of handling the current workload without interruptions or further delays. BEA works with the latest digital programs, such as, AutoCAD, REVIT/BIM, 3D, Max, Rhino, and other digital platforms. No.Project Length of Contract Scope of Services Type of Contract Current Phase % Completion of Current Phase Estimated Phase Completion Estimated Project Completion Contact Information 1 MoCA On Hold A/E services, landscape architectural consulting, design development, construction documents and construction administration. Project based fee Permitting 10%2021 2021 Jeff Geimer, MPA, CPRP, CFM, Public Works Department 305-895- 9874 jgeimer@northmiamifl.gov 2 Port Everglades Southport Phase IXA Container Yard Ongoing Architectural/Engineering Consulting services.Project based fee Permitting 20%2020 May-22 L. Michael Saltzman, P.E., 954-468- 0155, lsaltzman@broward.org 3 Miccosukee Golf Course Banquet Hall Ongoing Programming, Renovation, Addition,Project based fee CD 95%October-20 December-20 Eric Weiss, GM Miccosukee Golf Club 786-778-2299 ericw@miccosukeegolf.com 4 Miccosukee Golf Course Club house Ongoing Programming, Renovation, Addition,Project based fee CD 90%September-20 November-20 Eric Weiss, GM Miccosukee Golf Club 786-778-2299 ericw@miccosukeegolf.com 5 Port Canaveral Disney World CT-8 & Ct-10 Ongoing Construction Documents Project based fee CA 40%March-21 March-21 Veronica Narvaez Lugo Project Manager (321) 831-9075 6 Long Key Transfer Station Repairs Ongoing Bid and Permitting documents for repairs to the Long Key Transfer Station. Project based fee DC 90%September-20 September-20 Steven Sanders Project Manager (305)295-4338 sanders-steven@monroecounty- fl.gov 7 CT-V Onsite Field Personnel Services On Hold Architectural / Construction Management Services.Project based fee CA 5%November-21 November-21 Lazaro Alvarez Chief of Design Capital Development (305) 347-4891 lalvarez@miamidade.gov 8 Architectural & Engineering Services WO # 2 CT-V Design Milestones Submittals & Shop Drawing Review Services Ongoing Shop Drawings and Submittal Review, Construction Management Project based fee CA 15%November-21 November-21 Lazaro Alvarez Chief of Design Capital Development (305) 347-4891 lalvarez@miamidade.gov 9 City of Miami Beach City Hall Evac Plan Ongoing Feasibility Study / Preliminary Planning Project based fee ST 90%September-20 May-21 Adrian Morales (305) 673-7000 ext. 22932 8 Certified Minority Business Woman & Minority Business Certification BEA architects, Inc. 04/26/2019 04/26/2021 TAB 2 Project Approach & Understanding 10 Project Approach The upcoming Continuing Professional Consulting Services Contract provides BEA Architects with the opportunity for innovation and excellence that will improve the City of Sunny Isles Beach. BEA’s prime focus is to tailor our modern design approach to meet the needs of the City and create safe and modern facilities that will stand the test of time with innovation and sustainability. This requires a team of creative professionals experienced in governmental, civic and municipal facilities, as well as knowledgeable with creating contemporary and feasible designs that address the City’s needs and challenges with state-of-the-art technology and strategies to fulfill the scope of services set forth in this solicitation. Our expert team fully understand the importance of tailoring this project to meet the City citizen’s needs. BEA Architects is also firmly committed to meeting all: design, budget, scope of work, and schedule requirements associated with the project. The team will provide Architectural and Engineering Services, including Preliminary Design, Conceptual Design, Design Development, Cost Estimating, Bidding, Permitting, Construction Documents, and Construction Administration for a variety of new and existing municipal facilities. Along with our professional team, we will also provide studies and redevelopments, Preliminary Design, Feasibility Studies, environmental assessments, financial and economic studies, and more. Therefore, we are prepared to approach our tasks with the city in the following manner: At the onset of the contract, BEA will set up a project initiation meeting with the City of Sunny Isles Beach staff to identify and discuss the City’s requirements, goals, objectives, challenges, and opportunities, as well as listen to the needs of end-users and the local community. To ensure the success of the project, the team must clearly understand, respect and account for all other on-going and upcoming operations and account for the same within their approach to the project, design, schedule, as well as project phases and construction operations throughout the duration of the project. The team understands and is convinced that the success of the project will not only be measured by the successful, on-budget and on-schedule completion of a quality project, but also the incorporation of awareness and solutions that address the current impacts of the COVID-19 Pandemic. Our team possesses and brings a successful record municipal and civic building design experience, as well as proven Design, Construction Documents, Permitting, and Construction Administration capabilities following Federal, State, Local, and ADA regulations, laws and codes, that ensures the City of Sunny Isles Beach will receive State-of-the-Art quality projects on time and on budget. The BEA Team will be led by the Principal-in-Charge and Project Manager Bruno-Elias Ramos, AIA, GC, NCARB, LEED AP, who will be the main point of contact and will oversee the development of the projects, as well as the schedules and budgets. Under this agreement with the City of Sunny Isles Beach, BEA would be leading the Architectural Services team with an experienced leadership group comprised of senior architects and project managers with over 142 years of combined experience. BEA’s management of assigned projects, that ensures the availability of key personnel and the ability to meet deadlines without affecting the current workload, has continued to be one of our strengths. At the commencement of projects, BEA develops a comprehensive project schedule using the CPM framework. This schedule includes milestones for each discipline, client benchmarks and processing times for agencies having jurisdiction. The project manager will be tasked with ensuring that deadlines are met, along with updating the schedule with any project changes. BEA staffs each project with teams composed of a team leader, who may also be the project architect. He or she leads a group of specialized architects and designers to complete the necessary design, permitting and construction administration related tasks. BEA’s internal project management is supported by bi-weekly team leaders and senior staff meetings, where project status is provided to the Principal-in-Charge. These meetings ensure that projects are adequately supported and provide the opportunity for the teams to collaborate with management. BEA has established protocols for document collection, sharing, and protection between team members. Data collection for projects assigned under this agreement would require a structured approach, which BEA will implement to bring consistency to the team. BEA utilizes modern technology and traditional methods in its collection of field and online data with the use of drones by certified pilots, HD Cameras, GoPro cameras, HD video recording, traditional inspection logs, and field measurement. The approach of gathering electronic data will be as customary in our office, where the team will have access to our in-house network library. Once data is collected, the project architect uploads the raw data to our file sharing site for distribution to senior members who interpret, distill and turn this data into information used to inform how the project will proceed in its development. The data is formatted so that this information can be understood by both the client and the technical staff 11 who would be using this information to support the design decisions. Once the information has been processed, solutions are proposed and vetted among the senior project staff, which will include architects, engineers and project managers who are assigned to the project. BEA’s approach to finding the right or optimum solution is to engage in discussion and critique of multiple solutions. This is accomplished with a series of charrettes, varying from multi-hour sessions to multiple day sessions. Once this process is complete, BEA prepares the pros and cons of the final draft recommendation and presents this recommendation or design comparative solutions to the City’s staff for review. The dialogue between the City of Sunny Isles Beach and BEA regarding the process and solution is exceptionally valuable. BEA will solicit feedback from the City on the final recommendations before fine-tuning for a final recommendation submittal. Project Scope and Budget In discussing the project scope and budget, we shall: • Establish and identify project goals as we work with the City of Sunny Isles Beach to offer suggestions based on the goals identified.• Establish a comparative analysis document to evaluate each of the options for project development.• Establish design parameters.• Establish a timeline of deliverables for all phases including: Schematics, 30%, 60%, 90%, and final Construction Documents.• Establish protocol for the permitting/bidding phase and Construction Administration.• Establish protocol for invoicing and monitoring fees, and determining what services are part of the agreement. On the basis of the City’s goals and expectations, along with BEA’s overall understanding of the project, we will develop a comprehensive project schedule and time-line delineating project management expectations to achieve optimum workflow and project completion in an expedited manner. Though it may seem simplistic, the smooth flow of the project depends on the mutual understanding and agreement on these matters. Schematic Design – Design Development At the start of the project, BEA will conduct a program verification and a schedule/budget analysis. During the schematic design phase, we will envision the design concepts and visualize communications to the client via 3D images, sketches, plans, sections, elevations, and/or models to fully convey the main idea. When requested to do so, BEA will present illustrations of design alternatives in 2D and 3D to City’s staff and project team. At this stage, the team identifies the major project components and systems. This will include those that have a direct impact on LEED certification among others. We work collaboratively with comparative studies, present design alternatives in 2D and 3D for the client’s evaluation. We conduct several presentation meetings and the final submittal review meeting. Essential to the successful delivery of the project is the team’s ability to timely design, engineer and submit for permits, a civil/site development and building foundation package that is well coordinated with the architectural and engineering requirements set forth by the City of Sunny Isles Beach. The team has an extensive record of successful experience with both horizontal and vertical projects to ensure that a civil/site development and foundation package can be successfully designed and permitted in an expedited manner. Parallel with the design of the civil/site and foundation package, team members will be ready to proceed and further develop the design and additional meetings will be scheduled with City staff and others involved for design validation, and sign-off for the various stages of the project. Upon completion of each review and approval workshops, a list of pending items will be issued showing responsibilities for each task identified. Each of the team’s project managers will follow up with their respective task list to assure listed items are timely and efficiently resolved and incorporated into the documents. The project’s technical submittals and material sample review will be coordinated by the team and presented at project review or workshop sessions. This will allow the City of Sunny Isles Beach the opportunity to review and ask questions to the team, as well as provide them with the opportunity to incorporate their suggestions and comments. 12 Maintain Time Schedules Due to multiple teams set within BEA, we are equipped to handle multiple jobs without affecting the flow or the ability to meet deadlines. Based on an assessment of our current workload, BEA has sufficient personnel and capacity available to immediately assign the designated team to undertake and proceed with the project tasks. BEA will assign a project team headed by the Principal-In-Charge as Project Manager. The team consists of CAD/BIM production staff, specification writers, schedulers, estimators and a host of illustrators. Visual exhibits are key to the project approval phase as well as to City’s outreach process. BEA works with the latest digital programs, such as, AutoCAD, REVIT/BIM, 3D, Max, Rhino, and other digital platforms. In addition, we have an in-house Graphic Design Department with full printing and binding capabilities that perform the preparation of brochures and any other media related to the project. Cost Control and Value Engineering Our approach to value engineering and cost control is tied to our design philosophy – we work collaboratively to present a creative, organized effort to achieve all the essential functions at the lowest total cost without jeopardizing the design quality. The team presents various options during the early stages of design, as we develop the project in close collaboration with the City of Sunny Isles Beach. These options are analyzed for cost impact as well as design operational, implementation and schedule implications. The Value Engineering process is most technologically efficient when is the result of the collaboration between the owner, the architect, the engineer, the general contractor and/or the construction manager so that choices are made together and implications are weighted from all sides. We see value engineering as a response to ever-shifting project conditions, such as, the market environment, labor forces, and availability of products. Therefore, is part of our business landscape so that our team can be prepared to accommodate change within reason. BEA Team includes two licensed general contractors whom assist in the constructability reviews and estimating processes of every project. Quality Control BEA employs a three-step Quality Control Review System that extends to coordination of sub-consultants drawing and calculations, whereby the Deputy Project Manager is the first reviewer of the work product. His mark-ups are incorporated and sent to the Senior Architect assigned to the project. Said partner’s comments are incorporated and sent to the Principal-In-Charge, Bruno-Elias Ramos, AIA, GC, NCARB, LEED AP, for a final review. Each individual’s mark-ups are recorded in their own color, and the entire check set is maintained on file. In addition, Mr. Ramos, as peer reviewer and Principal-In-Charge of BEA, will conduct specific analysis of project documentation. The three-step process is used at 50% and 100% construction documents and as necessary at other phase intervals. Of course, the client is the fourth step of the review process. Though it may appear at first cumbersome, we have found controlling documents in this manner helps projects of all sizes to run smoothly. Software Expertise In addition to on-site, face-to-face meetings, the team has an extremely successful record of experience hosting on-line working/collaboration meetings using Google Meet/Zoom Meeting technology. At these online collaboration and work sessions, BEA is capable of presenting in real time via shared screen protocol; BIM models, CAD drawings, renderings, shop drawings and specifications, as well as job site/construction photographs and images for discussion and review by all remote meeting participants. In the course of a Google Meet Meeting collaboration and work session, BEA has the ability to quickly make and assess changes to a design, as well as review and coordinate design work between the various disciplines, and discuss coordination issues with all remote meeting participants. Thus, in many cases, design and construction issues that may typically require two or three days to coordinate and resolve may be solved expeditiously at one sitting without the need to travel or experience long waits between reviews. BEA uses 3D animation software and BIM (Building Information Management technology) to aid the client and the design and construction team to design successful and meaningful spaces that are fully coordinated across all disciplines. Animation provides a visualization of the concept and allows the client to encounter, visualize and 13 “walk-through” a three-dimensional image of a building in real time. The design project is built in a digital/virtual environment, which allows immediate assessment of design decisions. Extractions from the BIM model are used to generate 2D CAD drawings and construction documents. The CAD drawings extracted from the BIM model accurately reflect the coordination of myriad building systems that have been undertaken on the model. This tool therefore allows the coordination of varying levels of building system details, to result in a thorough analysis and planning before the building construction process commences – an which can be amended with new design input to assess impact of design alternative during the phases of both design and construction to achieve high levels of project coordination, as well as assess potential impacts to the Project Schedule. Construction Documents Once the Design Development Package is approved by the City of Sunny Isles Beach, we proceed with the preparation of construction documents and specifications. Normally, this phase is broken in 50% and 100% submittals, although per the client’s request it can also be broken down further. At each one of the milestones, we submit complete sets of plans, specifications, and estimate of probable cost, and schedule and conduct a review meeting with City’s project team to convey and explain the project details. Any comments resulting from this and other review sessions are incorporated immediately into the final work product for construction. A key element of this phase is to achieve thorough coordination between all disciplines. BEA performs regular coordination meetings with the sub-engineers and requires follow-up meetings to ensure that the revisions have been incorporated. Based on the project delivery method employed, BEA is experienced in reviewing CDs with the construction manager under a CM-at-Risk project delivery. Sustainability and Wellness As a member of the United States Green Building Council (USGBC), BEA Architects maintains an upmost commitment to sustainability practices in all projects. BEA’s Principal-In-Charge, Bruno-Elias Ramos, is a LEED accredited professional. Deputy Project Manager, Armando Trujillo, also holds an accreditation of LEED AP BD+C. BEA Architects employs additional staff members holding LEED AP designation. BEA Architects integrates sustainable practices from project inception and continues to build these practices in as the project is developed. This is done so as to ensure that these initiatives become part of the natural on-going project development process. Throughout project phases, BEA utilizes comparative analysis techniques that develop sustainability through the provision of various design and material alternatives. These alternatives are presented to the client with potential cost and design implications in mind so as to allow the client to decide which initiatives are best for the overall project goal. In this way, BEA is able to make sure that the client is fully informed and is able to evaluate sustainability options from every angle, keeping budget and time constraints in mind. BEA Architects also brings their in-depth knowledge of the Florida Green Building Coalition (FGBC) to all of their projects. In doing so, BEA provides first-hand knowledge of the latest techniques and materials to promote Green Building Standards and environmentally sustainable projects, while maintaining the highest possible level of operational efficiency. BEA Architects is aware of the multitude of components of the WELL Building Standard and is passionate about integrating design components that advance human health and well-being initiatives via lighting, air and water, and additional occupant-pleasing design initiatives. BEA enjoys implementing Wellness Architecture into its designs to promote an earth-friendly environment, which brings the opportunity for staff and citizens to be surrounded by a safe, clean, and eco-friendly environment. Moreover, BEA is highly knowledgeable on building automation, designing buildings that are smart to occupants’’ needs and responsive to internal and external changes, being climatic or programmatic. Along with LEED certification, BEA will attempt to employ techniques for these advancements as well, when appropriate, to obtain a Gold LEED Certification for this project. “BEA Architects is fully committed to providing the City of Sunny Isles Beach with a dedicated professional team that will take on each project with dilligence and expertise to meet all requirements and deadlines on time and within budget.” TAB 3 Qualification Information & Assigned Personnel 15 Firm Profile BEA Architects, Inc., a world-renowned architectural design firm headquartered in Miami, has established a reputation as an innovative provider of leading-edge design solutions to corporations and institutions worldwide. The reputation of the firm rests on its most important asset: its people, whose energy, creativity and commitment point to even greater accomplishments in the decades to come. Established over 25 years ago, BEA Architects is an interdisciplinary firm providing planning, architectural, engineering and construction services. As design specialists, the firm is renowned worldwide for its state-of-the-art facilities, including educational, civic and municipal, community centers, cultural centers, passenger terminals, and more. The firm’s proficiency results from years of experience working with different cities, counties, and public organizations, through which BEA has developed a keen understanding of the municipalities, communities and its operations. BEA’s expertise ranges from architectural services, master planning, schematic design, design development, construction documentation and permitting to construction management. The pursuit of excellence in design, through technology and in execution, underscores BEA’s commitment to quality. Central to the firm’s philosophy is the notion of design innovation, thinking creatively and “outside of the box.”. Our philosophy is accomplished through the attention of direct senior personnel to design challenges and through the enthusiasm and passion the BEA team brings to detailing and crafting a finished product. The BEA design team, through its vast educational and city master planning, and education project experience, has a deep understanding of the important factors that must be accounted for in every project. Experience, insight and education are key attributes that President Bruno-Elias Ramos, AIA, has compiled over the years. Add that to his familiarity working around the world, and it’s a recipe for a successful international design practice. Ramos draws on more than 30 years of experience in his field and his diversified background and leadership expertise ensures uncompromising professional service. His work has extended to cruise terminals, parking garages, airports, railways, community centers, parks, sporting facilities, and much more. The firm has many years of successful experience in architectural and engineering continuing services contracts with different cities, organizations and municipalities, including: City of Miami Beach, PortMiami, City of North Miami, City of Miami Gardens, Miami-Dade Parks & Recreation, Miami-Dade County Public Schools, Port Canaveral, Port Everglades, among others. The BEA Team consists of the international talents of 30 employees, representing more than 20 different nationalities. Through a collaborative design approach, they arrive at solutions that take into account many influences, resulting in designs that are not pre-established but rather evolve during the design process. Moving forward, everyone at BEA Architects looks forward to the promises of tomorrow and are eager to help develop strategies and new technologies to meet and exceed future challenges. BEA Architects | 3075 NW South River Drive, Miami, Florida 33142 | P: 305.461.2053 F: 305.634.0599 | BEAmarketing@beai.com | www.beai.com | FEIN: #65-1020158 BEA Architects, Inc. AWARDS & RECOGNITION AIA Merit Award of Excellence Florida International University Graduate School of Business American Institute of Architects AIA Merit Award of Excellence Turkmenbashi International Seaport Terminal American Institute of Architects Gator 100 Top 10 AI Business Excellence Award for Architecture & Design - California Aquisition International FEFPA Award of Merit Ransom Everglades Aquatic Center Florida Educational Facility Planners Assoc. The Chicago Athenaeum Award Florida International University Graduate School of Business American Architecture Awards FEFPA Award of Merit Florida International University Graduate School of Business Florida Educational Facility Planners Assoc. AIA Merit Award of Excellence Port of Miami Terminals 3, 4 & 5 American Institute of Architects AIA Design Awards Finalist Florida lnternational University Paul L. Cejas School of Architecture American Institute of Architects 16 Form SF330 Part I ARCHITECT - ENGINEER QUALIFICATIONS 11 PART I - CONTRACT-SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1. TITLE AND LOCATION (City and State) B. ARCHITECT-ENGINEER POINT OF CONTACT 4. NAME AND TITLE 5. NAME OF FIRM 6. TELEPHONE NUMBER 7. FAX NUMBER 8. E-MAIL ADDRESS C. PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors.) (Check) 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT PRIME J-V PARTNERSUBCON- TRACTORa. CHECK IF BRANCH OFFICE b. CHECK IF BRANCH OFFICE c. CHECK IF BRANCH OFFICE d. CHECK IF BRANCH OFFICE e. CHECK IF BRANCH OFFICE f. CHECK IF BRANCH OFFICE D. ORGANIZATIONAL CHART OF PROPOSED TEAM (Attached) 2. PUBLIC NOTICE DATE 3. SOLICITATION OR PROJECT NUMBER Continuing Professional Consulting Services (CCNA) August 18, 2020 RFQ No. 20-07-01 Bruno-Elias Ramos, Principal-in-Charge BEA Architects, Inc. (305) 461-2053 beamarketing@beai.com BEA Architects, Inc.3075 NW South River Drive, Miami, FL 33142 ArchitectX Nova Consulting, Inc.3323 W. Commercial Blvd, Suite 250Fort Lauderdale, FL 33309 Civil Engineer, Lead Detection Studies, and Construction Engineering and Inspection (CEI) X X Hammond & Associates, Inc.150 NW 70th Avenue, Suite 10, Plantation, FL 33317 Electrical, Mechanical, HVAC and Plumbing Engineer Premiere Design Solutions, Inc.1065 NE 125th St,Suite 211-B, North Miami, FL 33161 Surveyor and Mapping X X X X X Universal Engineering Sciences, LLC 7260 NW 58th Street, Miami, FL 33166 Geotechnical Engineering and Materials Sampling and Testing X PMM Consulting Engineers, Corp. 6262 Bird Road,Suite 2DMiami, FL 33155 Structural Engineer 17 Form SF330 Part I ARCHITECT - ENGINEER QUALIFICATIONS 11 PART I - CONTRACT-SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1. TITLE AND LOCATION (City and State) B. ARCHITECT-ENGINEER POINT OF CONTACT 4. NAME AND TITLE 5. NAME OF FIRM 6. TELEPHONE NUMBER 7. FAX NUMBER 8. E-MAIL ADDRESS C. PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors.) (Check) 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT PRIME J-V PARTNERSUBCON- TRACTORa. CHECK IF BRANCH OFFICE b. CHECK IF BRANCH OFFICE c. CHECK IF BRANCH OFFICE d. CHECK IF BRANCH OFFICE e. CHECK IF BRANCH OFFICE f. CHECK IF BRANCH OFFICE D. ORGANIZATIONAL CHART OF PROPOSED TEAM (Attached) 2. PUBLIC NOTICE DATE 3. SOLICITATION OR PROJECT NUMBER Bruno-Elias Ramos, Principal-in-Charge BEA Architects, Inc. (305) 461-2053 beamarketing@beai.com X Continuing Professional Consulting Services (CCNA) August 18, 2020 RFQ No. 20-07-01 Coastal Systems International, Inc. 464 South Dixie Hwy,Coral Gables, FL 33146 Environmental Engineer and Sea Level Rise Consultant 18 Form SF330 Part I E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE a. TOTAL b. WITH CURRENT FIRM 15. FIRM NAME AND LOCATION (City and State) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm b. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm c. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm d. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm e. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm 16. EDUCATION (Degree and Specialization)17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 35 27 BEA Architects, Inc.BE Miami, FL. Master of Architecture Bachelor of Design Registered Architect: Florida, AR0012160 General Contractor: Florida, CG-C033989 Registered Architect: Georgia, RA015956 LEED Accredited Professional Bruno-Elias Ramos Principal-in-Charge, Project Manager Mr. Ramos is an industry leader in innovative state-of-the-art facilities in planning and design, and has successfully been part of and completed over more than 20 continuing services contract in the last 10 years, with different municipalities and counties throughout South Florida, including but not limited to, City of Miami Beach, City of Miami Gardens, City of North Miami, City of West Palm Beach, City of Hialeah, and more. American Institute of Architects; Gator 100 Top 10: 2017, 2018, 2019 and 2020; AIA Merit Award of Excellence; FEFPA Award of Merit. BEA Architects is currently performing courtyard renovations to the Museum of Contemporary Art in North Miami, FL. Some of the improvements include the select demolition, the removal and replacement of the existing canopy fabric to install a removable turnbuckle canopy system; the removal of the existing paver system for a new permeable paver system. 2017-2019 2018-2019 BEA Architects was contracted by the City of Miami Beach to design a fully enclosed, air conditioned modern f acility with new interior finishes, new lighting, impact resistant windows, new reception area, offices, conference room, flexible casual seating, enhanced security and a contemporary retail environment. The project was completed within the City’s budget and time schedule, without disruption to the Tennis Center’s ongoing operations. 2019 2019 As part of an Architectural Continuous Service Contract with the City of Miami Beach, BEA Architects provided Architectural and Engineering Services for Interior Tenant Improvements to the City of Miami Beach Historic City Hall. Some of the interior improvements include the replacement of new flooring, new floor base, and the replacement of existing ceiling tiles that were damaged or worn. BEA also was responsible for Permitting and preparing and issuing Bid Documents, as well as providing Construction Administration services and Project Close-out. 2019 BEA Architects was hired by the City of Hallandale Beach to provide conceptual design at selected sites along Foster Road to articulate the City's vision. The City envisioned the creation of a mixed-use residential and commercial facility that brings together new market-rate housing, retail, restaurants, and entertainment venues. The design features the creative use of "shipping containers" to realize quick, cost-efficient design solutions in a dynamic urban setting. BEA Architects is currently making improvements to the existing Banquet Hall and renovations to the Club House of the Miccosukee Golf and Country Club in Miami, FL. BEA provided construction drawings for the renovations of the Banquet Hall, the covered walkway connecting to the Banquet Hall, and the Club House, plus the addition of a new Pro Shop. Ongoing MMooCCAA CCoouurrttyyaarrdd IImmpprroovveemmeennttss,, NNoorrtthh MMiiaammii,, FFLL Ongoing TThhee NNoorrtthh SShhoorree TTeennnniiss CCeenntteerr IImmpprroovveemmeennttss,, MMiiaammii BBeeaacchh,, FFLL MMiiaammii BBeeaacchh HHiissttoorriicc CCiittyy HHaallll IInntteerriioorr IImmpprroovveemmeennttss,, MMiiaammii BBeeaacchh,, FFLL MMiiccccoossuukkeeee GGoollff CCoouurrssee BBaannqquueett HHaallll aanndd CCoouunnttrryy CClluubb RReennoovvaattiioonnss,, MMiiaammii,, FFLL FFoosstteerr RRooaadd SSttuuddyy,, HHaallllaannddaallee BBeeaacchh,, FFLL 19 Form SF330 Part I E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE a. TOTAL b. WITH CURRENT FIRM 15. FIRM NAME AND LOCATION (City and State) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm b. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm c. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm d. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm e. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm 16. EDUCATION (Degree and Specialization)17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) John Colao 38 24 BEA Architects, Inc. Miami, FL. Registered Architect: Florida, AR 0007260 General Contractor: Florida, CG-C016746 NCARB Certification No. 19768 Senior Architect, Planning & Project Coordinator, QA/QC Bachelor of Architecture (Honors) Professional Affiliations include: American Institute of Architects, and Grater Miami Chamber of Commerce. Mr. Colao manages large scale public and private sector projects involving municipalities and civic facilities, schools and universities, parks, cruise terminals, retail facilities, office buildings, and warehouses. He is an expert in constructibility reviews, code analysis and interdisciplinary coordination. 2019 2017-2019 2018-2019 BEA Architects was contracted by the City of Miami Beach to design a fully enclosed, air conditioned modern facility with new interior finishes, new lighting, impact resistant windows, new reception area, offices, conference room, flexible casual seating, enhanced security and a contemporary retail environment. The project was completed within the City’s budget and time schedule, without disruption to the Tennis Center’s ongoing operations. As part of an Architectural Continuous Service Contract with the City of Miami Beach, BEA Architects provided Architectural and Engineering Services for Interior Tenant Improvements to the City of Miami Beach Historic City Hall. Some of the interior improvements include the replacement of new flooring, new floor base, and the replacement of existing ceiling tiles that were damaged or worn. BEA also was responsible for Permitting and preparing and issuing Bid Documents, as well as providing Construction Administration services and Project Close-out. 2014 2014 Complete architectural and engineering services for a new, two-story dock-master building offering offices, a multipurpose room, restrooms, and a laundry facility for boaters renting slips in the marina. The 3,000-SF structure boasting Art Deco Revival style is located on a small key between Miami’s mainland and Miami Beach. Site improvements include replacing light poles and all new landscaping. CCrroowwlleeyy IInnssppeeccttiioonn DDoocckk,, PPoorrtt EEvveerrggllaaddeess,, FFLL 2019 2020 BEA Architects was contracted to provide complete Design-Build services for the construction of an 80 slot covered USDA inspection dock at Port Everglades in Fort Lauderdale, FL. Each container slot is equipped with reefer plugs to power the refrigerated containers during inspection. Mr. Colao served as BEA’s Quality Assurance Officer of pre-fabricated materials, and led the construction personnel to ensure the project stayed on budget and schedule. MMooCCAA CCoouurrttyyaarrdd IImmpprroovveemmeennttss,, NNoorrtthh MMiiaammii,, FFLL BEA Architects is currently performing courtyard renovations to the Museum of Contemporary Art in North Miami, FL. Some of the improvements include the select demolition, the removal and replacement of the existing canopy fabric to install a removable turnbuckle canopy system; the removal of the existing paver system for a new permeable paver system. Ongoing 2019MMiiaammii BBeeaacchh HHiissttoorriicc CCiittyy HHaallll IInntteerriioorr IImmpprroovveemmeennttss,, MMiiaammii BBeeaacchh,, FFLL TThhee NNoorrtthh SShhoorree TTeennnniiss CCeenntteerr IImmpprroovveemmeennttss,, MMiiaammii BBeeaacchh,, FFLL PPeelliiccaann HHaarrbboorr MMaarriinnaa DDoocckk--MMaasstteerr FFaacciilliittyy wwiitthh PPaarrkkiinngg,, MMiiaammii--DDaaddeeCCoouunnttyy,, FFLL 20 Form SF330 Part I E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE a. TOTAL b. WITH CURRENT FIRM 15. FIRM NAME AND LOCATION (City and State) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm b. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm c. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm d. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm e. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm 16. EDUCATION (Degree and Specialization)17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Adrian Price 12 10 BEA Architects, Inc. Miami, FL. Master of ArchitectureBachelor of Arts in Architectural Studies Registered Architect: Florida, AR 97981 NCARB Certification No. 83552 Vice-President, Cost Estimates & Schedule Manager Mr. Price is an exemplary team leader who also manages the Scheduling and Cost Estimating of all kinds of projects projects, to ensure the successful and timely delivery of projects within budget. He has successfully managed and led teams through various complex Architectural and Engineering, Planning and Consulting project types using different delivery methods. BEA Architects is currently performing courtyard renovations to the Museum of Contemporary Art in North Miami, FL. Some of the improvements include the select demolition, the removal and replacement of the existing canopy fabric to install a removable turnbuckle canopy system; the removal of the existing paver system for a new permeable paver system. BEA Architects is currently making improvements to the existing Banquet Hall and renovations to the Club House of the Miccosukee Golf and Country Club in Miami, FL. BEA provided construction drawings for the renovations of the Banquet Hall, the covered walkway connecting to the Banquet Hall, and the Club House, plus the addition of a new Pro Shop. As part of the Professional Architectural and Engineering Continuing Services Contract, BEA Architects engaged in a new Task Order for Architectural and Engineering Services to prepare Bid and Permit Documents for repairs at the Layton Transfer Station, Long Key, FL. BEA is providing complete architectural and engineering services, including Pre-Design, Construction Documents, Bidding, Permitting and Construction Administration. 2014 Complete architectural and engineering services for a new, two-story dock-master building offering offices, a multipurpose room, restrooms, and a laundry facility for boaters renting slips in the marina. The 3,000-SF structure boasting Art Deco Revival style is located on a small key between Miami’s mainland and Miami Beach. Site improvements include replacing light poles and all new landscaping. 2014 Ongoing 2019 2019 BEA Architects designed a new mooring bollards and apron improvements. BEA’s scope of work included the replacement of concourse egress stairs, audiovisual systems, mechanical systems, and lightning protection systems. Electrical improvements were also made, along with a new entrance for canopies. BEA also made general building envelope repairs, including sliding glass doors and water intrusion repairs. MMooCCAA CCoouurrttyyaarrdd IImmpprroovveemmeennttss,, NNoorrtthh MMiiaammii,, FFLL Ongoing MMiiccccoossuukkeeee GGoollff CCoouurrssee BBaannqquueett HHaallll aanndd CCoouunnttrryy CClluubb RReennoovvaattiioonnss,, MMiiaammii,, FFLL Ongoing LLoonngg KKeeyy TTrraannssffeerr SSttaattiioonn RReessttoorraattiioonnss,, MMoonnrrooee CCoouunnttyy,, FFLL PPeelliiccaann HHaarrbboorr MMaarriinnaa DDoocckk--MMaasstteerr FFaacciilliittyy wwiitthh PPaarrkkiinngg,, MMiiaammii--DDaaddee CCoouunnttyy,, FFLL PPoorrttMMiiaammii CCrruuiissee TTeerrmmiinnaall BB && CC:: CCoonnvveerrssiioonn ttoo CC,, MMiiaammii,, FFLL 21 Form SF330 Part I E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE a. TOTAL b. WITH CURRENT FIRM 15. FIRM NAME AND LOCATION (City and State) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm b. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm c. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm d. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm e. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm 16. EDUCATION (Degree and Specialization)17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Armando Trujillo 32 5 BEA Architects, Inc. Miami, FL. Bachelor of Architecture (Honors)Registered Architect: Florida, AR0014721 Registered Architect: Texas, No. 10468 LEED Accredited Professional Vice-President & Deputy Project Manager Registered Architect Armando Trujillo has over 32 years of experience managing a wide variety of architectural projectswith direct responsibility and accountability for day-to-day operations and performance of the project team. ProfessionalAffiliations: American Institute of Architects. BEA Architects was contracted by the City of Miami Beach to design a fully enclosed, air conditioned modern facility with new interior finishes, new lighting, impact resistant windows, new reception area, offices, conference room, flexible casual seating, enhanced security and a contemporary retail environment. The project was completed within the City’s budget and time schedule, without disruption to the Tennis Center’s ongoing operations. 2019 BEA Architects was contracted by the City of Miami Beach to design a fully enclosed, air conditioned modern f acility with new interior finishes, new lighting, impact resistant windows, new reception area, offices, conference room, flexible casual seating, enhanced security and a contemporary retail environment. The project was completed within the City’s budget and time schedule, without disruption to the Tennis Center’s ongoing operations. As part of an Architectural Continuous Service Contract with the City of Miami Beach, BEA Architects provided Architectural and Engineering Services for Interior Tenant Improvements to the City of Miami Beach Historic City Hall. Some of the interior improvements include the replacement of new flooring, new floor base, and the replacement of existing ceiling tiles that were damaged or worn. BEA also was responsible for Permitting and preparing and issuing Bid Documents, as well as providing Construction Administration services and Project Close-out. 2019 2019 Ongoing 2019 Ongoing 2019 BEA Architects was hired by the City of Hallandale Beach to provide conceptual design at selected sites along Foster Road to articulate the City's vision. The City envisioned the creation of a mixed-use residential and commercial facility that brings together new market-rate housing, retail, restaurants, and entertainment venues. The design features the creative use of "shipping containers" to realize quick, cost-efficient design solutions in a dynamic urban setting. Mr. Trujillo served as the Claims Reviewer for the Southport Phase IX project. He reviewed project documents, contracts and records to prevent unnecessary contractor claims. BEA Architects provided planning, architecture, civil and environmental engineering, electrical engineering and surveying services for the design of a new cargo container yard at Port Everglades Southport. The new container yard planned and designed by BEA is part of an integrated expansion of the Port Everglades Southport Master Plan. FFoosstteerr RRooaadd SSttuuddyy,, HHaallllaannddaallee BBeeaacchh,, FFLL MMooCCAA CCoouurrttyyaarrdd IImmpprroovveemmeennttss,, NNoorrtthh MMiiaammii,, FFLL MMiiaammii BBeeaacchh HHiissttoorriicc CCiittyy HHaallll IInntteerriioorr IImmpprroovveemmeennttss,, MMiiaammii BBeeaacchh,, FFLL TThhee NNoorrtthh SShhoorree TTeennnniiss CCeenntteerr IImmpprroovveemmeennttss,, MMiiaammii BBeeaacchh,, FFLL SSoouutthhppoorrtt PPhhaassee IIXX,, PPoorrtt EEvveerrggllaaddeess,, FFLL 22 Form SF330 Part I E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE a. TOTAL b. WITH CURRENT FIRM 15. FIRM NAME AND LOCATION (City and State) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm b. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm c. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm d. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm e. (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm 16. EDUCATION (Degree and Specialization)17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Robert Draper 24 20 BEA Architects, Inc. Miami, FL Bachelor of Architectural Design Registered Architect: Florida, AR96257 Senior Architect, Compliance Reviews Senior Architect Robert Draper is a highly experienced design professional and registered architect. On a daily basis, Mr. Draper will develop designconcepts, provide cost estimating, design consultation, prepare construction documents and specifications, as well as act as a general source ofarchitectural knowledge. He is assigned to control certain projects from start to finish to ensure high quality, innovative and functional design. MMooCCAA CCoouurrttyyaarrdd IImmpprroovveemmeennttss,, NNoorrtthh MMiiaammii,, FFLL BEA Architects is currently performing courtyard renovations to the Museum of Contemporary Art in North Miami, FL. Some of the improvements include the select demolition, the removal and replacement of the existing canopy fabric to install a removable turnbuckle canopy system; the removal of the existing paver system for a new permeable paver system. 2017-2019 2018-2019 BEA Architects was contracted by the City of Miami Beach to design a fully enclosed, air conditioned modern facility with new interior finishes, new lighting, impact resistant windows, new reception area, offices, conference room, flexible casual seating, enhanced security and a contemporary retail environment. The project was completed within the City’s budget and time schedule, without disruption to the Tennis Center’s ongoing operations. Ongoing TThhee NNoorrtthh SShhoorree TTeennnniiss CCeenntteerr IImmpprroovveemmeennttss,, MMiiaammii BBeeaacchh,, FFLL 2014 Complete architectural and engineering services for a new, two-story dock-master building offering offices, a multipurpose room, restrooms, and a laundry facility for boaters renting slips in the marina. The 3,000-SF structure boasting Art Deco Revival style is located on a small key between Miami’s mainland and Miami Beach. Site improvements include replacing light poles and all new landscaping. 2014 2009 2012 Project Manager responsible for the 1961 Norman Giller Bandshell's restoration. Restoration and facility upgrades were required for this outdoor performance venue's historic Miami-Modern Architecture to handle more varied performances. the upgrade included a state of the art stage lighting system and ADA retrofit. Ongoing BEA was once again selected to renovate Port Canaveral’s Disney Cruise Terminal 8 and Cruise Terminal 10 and will include the design of three new additions, adding approximately 8,164 SF to the existing building. The new additions will include a Disney-themed front plaza that features living green sculptures of Mickey and Minnie Mouse, Donald Duck, Goofy and Pluto, over a lush floral garden that surrounds an iconic sculpture of Steamboat Willie. PPeelliiccaann HHaarrbboorr MMaarriinnaa DDoocckk--MMaasstteerr FFaacciilliittyy wwiitthh PPaarrkkiinngg,, MMiiaammii--DDaaddee CCoouunnttyy,, FFLL MMiiaammii BBeeaacchh BBaannddsshheellll PPaarrkk FFaacciilliittiieess RReennoovvaattiioonnss,, MMiiaammii BBeeaacchh,, FFLL (1) TITLE AND LOCATION (City and State) DDiissnneeyy CCrruuiissee TTeerrmmiinnaall 88,, PPoorrtt CCaannaavveerraall,, FFLL 23 Form SF330 Part I E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE a. TOTAL b. WITH CURRENT FIRM 15. FIRM NAME AND LOCATION (City and State) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm b. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm c. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm d. (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm e. (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm 16. EDUCATION (Degree and Specialization)17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Mario F. Ortega 25 24 BEA Architects, Inc. Miami, FL. Master of ArchitectureBachelor of ArchitectureMaster of Science in Architecture Pedagogy (MSAS) Director of Design First and only MDC School of Architecture professor to be honored with the AIA Miami Chapter Education LeadershipAward. A prolific writer, Mr. Ortega has also published over seven books, of which he has received two awards. BEA Architects is currently performing courtyard renovations to the Museum of Contemporary Art in North Miami, FL. Some of the improvements include the select demolition, the removal and replacement of the existing canopy fabric to install a removable turnbuckle canopy system; the removal of the existing paver system for a new permeable paver system. 2017-2019 2018-2019 BEA Architects was contracted by the City of Miami Beach to design a fully enclosed, air conditioned modern facility with new interior finishes, new lighting, impact resistant windows, new reception area, offices, conference room, flexible casual seating, enhanced security and a contemporary retail environment. The project was completed within the City’s budget and time schedule, without disruption to the Tennis Center’s ongoing operations. 2017-2018 BEA Architects was selected to perform waterside, marine, cruise terminal and overall logistics master planning as the design architect for the cutting edge multi-phased Seaport Cruise Terminal & Mixed-Use Development in Istanbul, Turkey. The winning masterplan includes a vibrant mix of shops, restaurants, cultural attractions, offices, hotels including a Peninsula Flag Hotel and a convention center that is thoughtfully situated over 21 acres, blending with the city’s existing urban fabric. BEA was once again selected to renovate Port Canaveral’s Disney Cruise Terminal 8 and Cruise Terminal 10 and will include the design of three new additions, adding approximately 8,164 SF to the existing building. The new additions will include a Disney-themed front plaza that features living green sculptures of Mickey and Minnie Mouse, Donald Duck, Goofy and Pluto, over a lush floral garden that surrounds an iconic sculpture of Steamboat Willie. Ongoing Ongoing Ongoing 2019 BEA Architects was hired by the City of Hallandale Beach to provide conceptual design at selected sites along Foster Road to articulate the City's vision. The City envisioned the creation of a mixed-use residential and commercial facility that brings together new market-rate housing, retail, restaurants, and entertainment venues. The design features the creative use of "shipping containers" to realize quick, cost-efficient design solutions in a dynamic urban setting. FFoosstteerr RRooaadd SSttuuddyy,, HHaallllaannddaallee BBeeaacchh,, FFLL MMooCCAA CCoouurrttyyaarrdd IImmpprroovveemmeennttss,, NNoorrtthh MMiiaammii,, FFLL TThhee NNoorrtthh SShhoorree TTeennnniiss CCeenntteerr IImmpprroovveemmeennttss,, MMiiaammii BBeeaacchh,, FFLL (1) TITLE AND LOCATION (City and State) GGaallaattaappoorrtt MMiixxeedd--UUssee DDeevveellooppmmeenntt wwiitthh CCrruuiissee TTeerrmmiinnaall,, IIssttaannbbuull,, TTuurrkkeeyy (1)TITLE AND LOCATION (City and State) DDiissnneeyy CCrruuiissee TTeerrmmiinnaall 88,, PPoorrtt CCaannaavveerraall,, FFLL 24 Form SF330 Part I F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 23.PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE BEA Architects, Inc.Miami, FL Architect 1 FFoosstteerr RRooaadd SSttuuddyy,, HHaallllaannddaallee BBeeaacchh,, FFLL 2019 City of Hallandale Beach Dr. Jeremy Earle BEA Architects was hired by the City of Hallandale Beach to provide conceptual design at selected sites along Foster Road to articulate the City's vision. The City envisioned the creation of a mixed-use residential and commercial facility that brings together new market-rate housing, retail, restaurants, and entertainment venues. The design features the creative use of "shipping containers" to realize quick, cost-efficient design solutions in a dynamic urban setting. The City's intent was to activate the district without the delays/expenses associated with conventional brick and mortar construction. Therefore, the "shipping container" type of construction was emphasized and chosen by the City due to its speed in fabrication and construction, as well as its clean and modern design aesthetic.” (954) 457-3070 25 Form SF330 Part I F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 23.PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE 2 2019 City of Miami Beach, Property Management Department Mr. Adrian Morales As part of an Architectural Continuous Service Contract with the City of Miami Beach, BEA Architects provided Architectural and Engineering Services for Interior Tenant Improvements to the City of Miami Beach Historic City Hall. BEA designed the interior renovations for two floors of the building, totaling of approximately 3,450 SF. BEA conducted program verification based on the input from the Property Management Department (PMD), and prepared space plans based on the programming information that was provided by the same department. Some of the interior improvements include the replacement of new flooring, new floor base, and the replacement of existing ceiling tiles that were damaged or worn. The design and renovations were done so that the historical façade and interiors would match while preserving the historical value. BEA also was responsible for Permitting and preparing and issuing Bid Documents, as well as providing Construction Administration services and Project Close-out. 2019 (305) 673-7000 ext. 22932 MMiiaammii BBeeaacchh HHiissttoorriicc CCiittyy HHaallll IInntteerriioorr IImmpprroovveemmeennttss,, MMiiaammii BBeeaacchh,, FFLL BEA Architects, Inc.Miami, FL Architect 26 Form SF330 Part I F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 23.PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE BEA Architects, Inc.Miami, FL Architect 3 MMooCCAA CCoouurrttyyaarrdd IImmpprroovveemmeennttss,, NNoorrtthh MMiiaammii,, FFLL Ongoing City of North Miami Mr. Jeff Geimer BEA Architects is currently performing courtyard renovations to the Museum of Contemporary Art in North Miami, FL. The design includes a seamless composition of white modular seating within a newly designed exterior courtyard space that will adapt to different events and gallery exhibits. Some of the improvements include the select demolition, the removal and replacement of the existing canopy fabric to install a removable turnbuckle canopy system, which will compliment the overall alchemy of the space and exterior flow, by allowing natural light to enter while still protecting visitors and art installations. This movable shading structure is mold resistant, self-cleaning, and reduces the heat while letting the breeze circulate through. It also helps to uplift the design of the museum because it can be modified to compliment the forever changing aspect of the exhibitions. BEA is also doing the installation of a new trench drain along with a storm-water drainage system and the removal of the existing paver system for a new permeable paver system. The lighting fixtures are being replaced to praise the galleries. New landscaping is added to the museum to improve the experience of the guests, by including modular, portable planters that will reinvent the courtyard’s façade year-round with lush palms. The façade and exterior walls are also being painted and renovated. Museum’s guest will be able to enjoy the magnificent art accompanied with the tropical feel that Miami has. (305) 893-6511 ext. 14004 27 Form SF330 Part I F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 23.PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE BEA Architects, Inc.Miami, FL Architect TThhee NNoorrtthh SShhoorree TTeennnniiss CCeenntteerr IImmpprroovveemmeennttss,, MMiiaammii BBeeaacchh,, FFLL 4 2018-2019 City of Miami Beach Ms. Pilar Caurin Tortajada 2017-2019 (305) 673-7071 ext. 6954 The City of Miami Beach Tennis Center at North Shore Park is a community sport and recreational facility located in the North Beach neighborhood of Miami Beach, FL. The Tennis Center includes 12 tennis courts and an office/Pro-Shop. BEA Architects was contracted by the City of Miami Beach to design a fully enclosed, air conditioned modern facility that would serve as the new office and Pro Shop. The original office and Pro-Shop was located within an open air building that featured a breezeway like structure. The project involved the demolition of select areas and enhancements to the existing open air breezeway tennis area. The upgraded office / Pro Shop building has new interior finishes, new lighting, impact resistant windows to protect the facility during the hurricane season in Florida. BEA also integrated a new reception area, offices, conference room, flexible casual seating for parents and visitors, enhanced security and a contemporary retail environment. The project was completed within the City’s budget and time scheduled, and without disruption to the Tennis Center’s ongoing operations. 28 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 23.PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE BEA Architects, Inc.Miami, FL Architect 5 LLoonngg KKeeyy TTrraannssffeerr SSttaattiioonn RReessttoorraattiioonnss,, MMoonnrrooee CCoouunnttyy,, FFLL Ongoing Monroe County, Public Works & Engineering Mr. Steven Sanders As part of the Professional Architectural and Engineering Continuing Services Contract, BEA Architects engaged in a new Task Order for Architectural and Engineering Services to prepare Bid and Permit Documents for repairs at the Layton Transfer Station, Long Key, FL. BEA is providing complete Architectural and Engineering Services, including Pre-Design, Construction Documents, Bidding, Permitting and Construction Administration. The project will consist of preparing demolition documents for the removal of damaged structures to be replaced, the repair of existing open metal framed structures, including damaged siding and roofind panels, as well as the installation of a new concrete electrical utility pole to replaced the damaged pole and to relocate all existing service gear. BEA will also replace the vertical siding and roof structure with similar material to provide the facility with a lasting covering that will stand damages of hurricanes and tropical storms. BEA will also ensure to repair all cracks and fractures in concrete separation walls at the storage bays and will provide record drawings for as-built conditions. The project has an estimated design period of 14 weeks and an estimated construction period of 6 weeks. (305) 295-4338 Form SF330 Part I 29 Form SF330 Part I F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 23.PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE BEA Architects, Inc.Miami, FL Architect 6 Ongoing Miccosukee Golf & Country Club Mr. Eric Weiss Following the submissions of a preliminary design proposal, BEA was awarded the opportunity to provide ArchitecturalDesign Services for the Miccosukee Golf and Country Club. Working closely with feedback and necessities from theMiccosukee Tribe Council members, BEA is currently making improvements and renovations to the existing BanquetHall and Club House located in Miami, FL. With the purpose of creating a modern appeal for the Banquet Hall, BEA hasprovided construction drawings for all new finishes, windows, and façade upgrades, along with an entirely new gableroof design featuring central structural truss system. With the new interior design, the Banquet Hall will have more to hostspace for multiple events at the same time. The renovations of the Clubhouse also include designing a modern appeal to the building by renovating and re-purposingthe existing roof structure and exterior walls, while applying new façade and envelope systems. The new design willinclude amenities of continuing customers, such as a new Pro Shop, fitness center and locker rooms. The exterior designwill feature the introduction of golf cart housing with a canopy to provide shelter for existing driving range positions, as wellas two private driving positions for instruction lessons. Connecting the two buildings, BEA has also provided designs andconstruction drawings to replace the existing covered walkway with a plaza that will feature a new, modern drop off andcanopy, anchored by a central fountain feature its design is inspired by the emblem of the Miccosukee Tribe. Throughthese renovations, the Miccosukee Tribe emphasizes on creating a more welcoming guest and customer experience. BEAanticipates a completion date of December 2020. (305) 382-3930 MMiiccccoossuukkeeee GGoollff CCoouunnttrryy CClluubb aanndd BBaannqquueett HHaallll RReennoovvaattiioonnss,, MMiiaammii,, FFLL.. 30 Form SF330 Part I F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 23.PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE BEA Architects, Inc.Miami, FL Architect 7 2019 2019 PortMiami, Miami-Dade County Ms. Vivian Alfonso (305) 347-5520 The existing and functioning 95,000-SF passenger Cruise Terminal of Norwegian Cruise Lines is under renovations, in anticipation of the inaugural arrival of the NCL Encore Ship. Key project improvements for the arrival of the NCL Encore to PortMiami Terminal C, required BEA Architects to design a new mooring bollards and apron improvements. BEA’s scope of work included the replacement of concourse egress stairs, audiovisual systems, mechanical systems, and lightning protection systems. Electrical improvements were also made, along with a new entrance for canopies. BEA also made general building envelope repairs, including sliding glass doors and water intrusion repairs. BEA was capable of creating a design in an accelerated period of 7 months. In order to achieve it, the project was distributed amongst three general contractors. Three different bid packages were created by allocating general work for building interior and exterior improvements, waterside apron renovations, and A/C mechanical work servicing the entire three-story terminal. The project has a narrow construction schedule spanning roughly 6 months. BEA collaborated with Port authorities, Port Maintenance, and Port Construction teams to simultaneously coordinate construction administration between all three General Contractors. BEA’s accelerated construction management also involved working closely with the Miami-Dade Building Department to bring much of the building’s Life Safety and Fire Protection up to code, and ensuring applicable permits for successful operations of the terminal on November 2019. PPoorrttMMiiaammii CCrruuiissee TTeerrmmiinnaall BB && CC:: CCoonnvveerrssiioonn ttoo CC,, PPoorrttMMiiaammii,, FFLL 31 Form SF330 Part I F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 23.PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE BEA Architects, Inc.Miami, FL Architect PPoorrtt EEvveerrggllaaddeess SSoouutthhppoorrtt PPhhaassee IIXX--BB && IIXX--AA,, PPoorrtt EEvveerrggllaaddeess,, FFLL Ongoing 8 Port Everglades, Broward County Mr. L. Michael Saltzman (954) 468-0155 BEA Architects provided Planning, Architecture, Civil and Environmental Engineering, Electrical Engineering and Surveying Services for the design of a new cargo container yard at Port Everglades Southport. The new container yard planned and designed by BEA is part of an integrated expansion of the Port Everglades Southport Master Plan. The project was divided into two components, Component I (Phase IX-B) and Component II (Phase IX-A). During the Phase IX-B, BEA provided complete Design-Build services for the Tenant Improvements Project for King Ocean. The project serves as a storage/processing yard for shipping containers, including perimeter fencing, entry gates, truck scales, paved yard, site drainage, potable water and sewer infrastructure, a sewer lift station and high mast exterior lighting. BEA is currently working on Phase IX-A, which consists of the redevelopment of the existing Foreign Trade Zone (FTZ) into a cargo container yard. BEA is providing complete Architectural and Engineering Services. 32 Form SF330 Part I F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 23.PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE BEA Architects, Inc.Miami, FL Architect 9 2018 2018 Florida International Terminal Mr. Klaus Stadthagen (954) 761-3880 ext. 205 BEA Architects continued its longstanding relationship with Port Everglades with the new Florida International Terminal by performing Architectural Design and Engineering Services, as well as Construction Administration and Project Close-out Services for the design and construction of a new 5,500 SF office building. The office building, which is part of an overall Cargo Facility Masterplan, is oriented and designed to take advantage of natural daylight with its clerestory roof design. The building is composed of a rigid frame structure and corrugated siding and roofing that ties it into its local environment and provides a durable shell to endure the harsh coastal site conditions. This structure includes executive offices, conference rooms, a kitchen and restrooms all designed with human ergonomics in mind. In the main circulation area, an open plan concept was designed, allowing for flexible planning capable of changing and adapting to company needs as it evolves. The building features energy efficient and water conservation plumbing fixtures, occupancy sensors for smart lighting controls, sophisticated communication, security systems and access controls. BEA took special care to create a more efficient work environment that led to increased work productivity and organization. Additionally, xeriscape landscaping was utilized on the exterior façade to bring green into an otherwise dry and hard building environment. FFlloorriiddaa IInntteerrnnaattiioonnaall TTeerrmmiinnaall OOffffiiccee BBuuiillddiinngg,, PPoorrtt EEvveerrggllaaddeess,, FFLL 33 Form SF330 Part I F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 23.PROJECT OWNER'S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE BEA Architects, Inc.Miami, FL Architect 10 DDiissnneeyy CCrruuiissee TTeerrmmiinnaall 88,, PPoorrtt CCaannaavveerraall,, FFLL Ongoing BEA Architects award-winning design for the state-of-the-art, Disney-themed cruise terminal, located in Port Canaveral, FL, provides passengers with the fully immersive Disney experience at the time of their arrival. The fourth-generation terminal includes advanced intermodal busing and luggage handling facilities, allowing passengers the ease of checking luggage once with the airline or hotel and routing it directly to their final destination. In 2019, BEA was once again selected to renovate Port Canaveral’s Cruise Terminal 8 which includes the design of three new additions, adding approximately 27,115 SF to the existing building. The new additions will include a Disney-themed front plaza that features living green sculptures of Mickey and Minnie Mouse, Donald Duck, Goofy and Pluto, over a lush floral garden that surrounds an iconic sculpture of Steamboat Willie. The additions also include a covered entry canopy and two covered baggage sorting areas, with a 8,200-SF entry hall. Passengers’ arrival will be enhanced with a new extended additional 300-LF covered drop-off zone, a new 1,200-SF check-in area and a new concierge area. BEA is adding a new 7,800-SF baggage screening building. BEA has expanded the mail room to a total of 1,300-SF to make the communications at the port easier. Waiting areas will also be updated with modern water side restrooms and will feature a larger seating area that will include 1,000 seats to accommodate larger passenger flows. BEA has also worked with Jacobs Engineering Group Inc. for the coordination of a new gangway building integration, site and wharf lighting. The estimated project cost is $39.6 million. Canaveral Port Authority Ms. Veronica Narvaez-Lugo (321) 783-7831 ext. 428 34 G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 26. NAMES OF KEY PERSONNEL (From Section E, Block 12) 27. ROLE IN THIS CONTRACT (From Section E, Block 13) 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in "Example Projects Key" section below before completing table. Place "X" under project key number for participation in same or similar role.) 1 2 3 4 5 6 7 8 9 10 29. EXAMPLE PROJECTS KEY NUMBER TITLE OF EXAMPLE PROJECT (From Section F) NUMBER TITLE OF EXAMPLE PROJECT (From Section F) 1 6 2 7 3 8 4 9 5 10 Bruno-Elias Ramos John Colao Adrian Price Armando Trujillo Robert Draper Mario F. Ortega Principal-in-Charge, Project Manager Senior Architect, Planning & Project Coordinator, QA/QCVice-President, Cost Estimating & Schedule Manager Vice-President & Deputy Project Manager Senior Architect, Compliance Reviews Director of Design Miami Beach Historic City Hall Interior Improvements, Miami Beach, FL MoCA Courtyard Improvements, North Miami, FL The North Shore Tennis Center Improvements, Miami Beach, FL Long Key Transfer Station Restorations, Monroe County, FL Miccosukee Golf Country Club and Banquet Hall Renovations, Miami, FL.Foster Road Study, Hallandale Beach, FL X X XXXX XXX X X XXXX XXX XXX XXX X X X X X X X X X X X X X X X PortMiami Cruise Terminal B & C: Conversion to C, PortMiami, FLPort Everglades Southport Phase IX-B & IX-A, Port Everglades, FL Florida International Terminal Office Building, Port Everglades, FL Disney Cruise Terminal 8, Port Canaveral, FL X X X X X Form SF330 Part I 35 PART II - GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (or Branch Office) NAME 3. YEAR ESTABLISHED 4. UNIQUE ENTITY IDENTIFIER 2b. STREET 5. OWNERSHIP a. TYPE 2c. CITY 2d. STATE 2e. ZIP CODE b. SMALL BUSINESS STATUS 6a. POINT OF CONTACT NAME AND TITLE 7. NAME OF FIRM (If Block 2a is a Branch Office) 6b. TELEPHONE NUMBER 6c. E-MAIL ADDRESS 8a. FORMER FIRM NAME(S) (If any) 8b. YEAR ESTABLISHED 8c. UNIQUE ENTITY IDENTIFIER 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function Code b. Discipline c. Number of Employees a. Profile Code b. Experience c. Revenue IndexNumber(see below)(1) FIRM (2) BRANCH Other Employees Total 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) PROFESSIONAL SERVICES REVENUE INDEX NUMBER 1.Less than $100,000 6. $2 million to less than $5 million 2.$100,000 to less than $250,000 7. $5 million to less than $10 million 3.$250,000 to less than $500,000 8. $10 million to less than $25 million 4.$500,000 to less than $1 million 9. $25 million to less than $50 million 5.$1 million to less than $2 million 10. $50 million or greater a. Federal Work b. Non-Federal Work c. Total Work 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. c. NAME AND TITLE 1. SOLICITATION NUMBER (If any)ARCHITECT-ENGINEER QUALIFICATIONS a. SIGNATURE b. DATE 20-07-01 BEA Architects, Inc.29 3075 NW South river Drive Miami FL 33142 Corporation Bruno-Elias Ramos, AIA, GC, NCARB, LEED AP, Principal-in-Charge (305) 461-205 Bruno-Elias & Associates, Corp.2000 65-1020158 65-1020158 beamarketing@beai.com 06 Architects 5 08 CADD Technician 7 12 Civil Engineer 1 57 Structural Engineer 1 C18 D04 D08 H01 I01 O01 P05 T03 Cost Estimating Design-Build Dredging Studies and Design Piers, Ship Terminal Facilities Industrial Buildings Office Buildings Planning Traffic & Transportation 2 4 1 6 1 1 2 1 19 5 1 6 6 08/18/2020 Bruno-Elias Ramos, AIA, GC, NCARB, LEED AP, Principal-in-Charge Form SF330 Part II 36 Licenses & CertificationsBEA Architects, Inc. Miami-Dade CountyInternal Services DepartmentArchitecture/Engineering (A/E)Pre-Qualification Certificate This certificate is hereby issued to: BEA ARCHITECTS INC 3075 NW South River Drive, Miami, FL 33142 Approval Date: 07/01/2020 Expiration Date: 07/31/2021 The above name applicant is pre-qualified to provide professional A/E services for Miami-Dade County for the period indicated above. The applicant has committed its firm to comply with the specific conditions listed below: 1. Pre-Qualified to offer professional services only in the Miami-Dade County technical categories shown in the “Statement of Technical Qualifications.” All technical category restrictions must be strictly adhered to. 2. Pre-Qualification Certification (PQC) consolidates the technical certification, affirmative action plan, and vendor registration into one streamlined certification process resulting in the issuance of a Pre-Qualification Certificate. 3. Report any significant changes, such as contact person, qualifier, ownership, firm address, etc., by login on the Self-Service Portal at www.miamidade.gov/vendor within 30 days of such a change. Failure to report said changes to the County may result in the immediate suspension or termination of your firm’s Pre-Qualification Certification. 4. Failure to renew your firm’s PQC at least thirty (30) days prior to your firm’s current expiration date may result in the suspension and/or termination from County programs and current or future contracts until your firm’s Pre-Qualification Certification has been properly renewed. Any lapses in the certification of any of the required PQC areas (vendor registration, affirmative action plan, or technical certification) will result in a lapse in your PQC. Firms are responsible for observing and adhering to all submission deadlines. 5. Any renewal applications and/or supporting documents submitted after the application deadline might delay the review of your firm’s PQC certification to the next available Technical Certification Committee meeting. The PQC application, submission deadlines, and the Technical Certification Committee meeting calendar can be found on Procurement Management web site located at: http://www.miamidade.gov/internalservices/prequailification-certification.asp 6. Permit Miami-Dade County representatives to have access during normal business hours to audit books and records to verify information submitted with this application. This right of access shall commence on the approval date of this certificate and shall terminate on its expiration date. Please note that if at any time Miami-Dade County’s has reason to believe that any person or firm has willfully and knowingly provided incorrect information or made false statements, the County may refer the matter to the State Attorney’s Office and/or other investigative agencies, initiate debarment procedures, and/or pursue sanctions or other legal remedies in accordance with Miami-Dade County policy and/or applicable federal, state and local laws. Approved By Technical Certification Committee Miami-Dade County 37 Miami-Dade County Internal Services DepartmentStatement of Technical Certification Categories Firm:BEA ARCHITECTS INC 3075 NW S River Dr,, Miami, FL 33142 Code Category Description Approval Date Expiration Date 1.04 TRANSPORTATION PLANNING - PORT AND WATERWAY SYSTEMS PLANNING 07/24/2019 07/31/2021 3.01 HIGHWAY SYSTEMS - SITE DEVELOPMENT AND PARKING LOT DESIGN 07/24/2019 07/31/2021 3.09 HIGHWAY SYSTEMS - SIGNING, PAVEMENT MARKING, AND CHANNELIZATION 07/24/2019 07/31/2021 4.02 AVIATION SYSTEMS - ARCHITECTURAL DESIGN 07/24/2019 07/31/2021 5.01 PORT AND WATERWAY SYSTEMS - ENGINEERING DESIGN 07/24/2019 07/31/2021 5.02 PORT AND WATERWAY SYSTEMS - ARCHITECTURAL DESIGN 07/24/2019 07/31/2021 5.03 PORT AND WATERWAY SYSTEMS - CRUISE TERMINAL DESIGN 07/24/2019 07/31/2021 5.04 PORT AND WATERWAY SYSTEMS - CRUISE TERMINAL EQUIPMENT DESIGN 07/24/2019 07/31/2021 5.05 PORT AND WATERWAY SYSTEMS - CARGO TERMINAL DESIGN 07/24/2019 07/31/2021 5.06 PORT AND WATERWAY SYSTEMS - CARGO TERMINAL EQUIPMENT DESIGN 07/24/2019 07/31/2021 5.07 PORT AND WATERWAY SYSTEMS - SECURITY SYSTEMS 07/24/2019 07/31/2021 5.08 PORT AND WATERWAY SYSTEMS - MARINE ENGINEERING DESIGN 07/24/2019 07/31/2021 5.10 PORT AND WATERWAY SYSTEMS - TRANSPORTATION SYSTEMS DESIGN 07/24/2019 07/31/2021 6.01 WATER AND SANITARY SEWER SYSTEMS - WATER DISTRIBUTION AND SANITARY SEWAGE COLLECTION AND TRANSMISSION SYSTEMS 07/24/2019 07/31/2021 11.00 GENERAL STRUCTURAL ENGINEERING 07/24/2019 07/31/2021 14.00 ARCHITECTURE 07/24/2019 07/31/2021 16.00 GENERAL CIVIL ENGINEERING 07/24/2019 07/31/2021 17.00 ENGINEERING CONSTRUCTION MANAGEMENT 07/24/2019 07/31/2021 Approved By Technical Certification Committee Miami-Dade County Code Category Description Approval Date Expiration Date 18.00 ARCHITECTURAL CONSTRUCTION MANAGEMENT 07/24/2019 07/31/2021 19.06 VALUE ANALYSIS AND LIFE-CYCLE COSTING - WATER AND SANITARY SYSTEMS 07/24/2019 07/31/2021 19.11 VALUE ANALYSIS AND LIFE-CYCLE COSTING - GENERAL STRUCTURAL ENGINEERING 07/24/2019 07/31/2021 19.14 VALUE ANALYSIS AND LIFE-CYCLE COSTING - ARCHITECTURE 07/24/2019 07/31/2021 19.16 VALUE ANALYSIS AND LIFE-CYCLE COSTING - GENERAL CIVIL ENGINEERING 07/24/2019 07/31/2021 21.00 LAND-USE PLANNING 07/24/2019 07/31/2021 22.00 ADA TITLE II CONSULTANT 07/24/2019 07/31/2021 Licenses & CertificationsBEA Architects, Inc. 38 Halsey Beshears, SecretaryRon DeSantis, Governor STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF ARCHITECTURE & INTERIOR DESIGN THE ARCHITECT CORPORATION HEREIN IS CERTIFIED UNDER THE PROVISIONS OF CHAPTER 481, FLORIDA STATUTES BEA ARCHITECTS, INC Do not alter this document in any form. 3075 NW SOUTH RIVER DRIVE LICENSE NUMBER: AA26001612 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. MIAMI FL 33142 Always verify licenses online at MyFloridaLicense.com Ron DeSantis, Governor STATE OF FLORIDA BOARD OF PROFESSIONAL ENGINEERS THE ENGINEERING BUSINESS HEREIN IS AUTHORIZED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES BEA ARCHITECTS, INC. Do not alter this document in any form. 3075 NW SOUTH RIVER DRIVE LICENSE NUMBER: CA30996 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. MIAMI FL 33142 Always verify licenses online at MyFloridaLicense.com Halsey Beshears, SecretaryRon DeSantis, Governor STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF ARCHITECTURE & INTERIOR DESIGN THE ARCHITECT HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 481, FLORIDA STATUTES RAMOS, BRUNO E Do not alter this document in any form. 3075 NW SOUTH RIVER DRIVE LICENSE NUMBER: AR0012160 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. MIAMI FL 33142 Always verify licenses online at MyFloridaLicense.com Halsey Beshears, SecretaryRon DeSantis, Governor STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION CONSTRUCTION INDUSTRY LICENSING BOARD THE GENERAL CONTRACTOR HEREIN IS CERTIFIED UNDER THE PROVISIONS OF CHAPTER 489, FLORIDA STATUTES RAMOS, BRUNO E Do not alter this document in any form. ART DESIGN & CONSTRUCTION INC LICENSE NUMBER: CGC033989 EXPIRATION DATE: AUGUST 31, 2022 This is your license. It is unlawful for anyone other than the licensee to use this document. 3075 NW SOUTH RIVER DRIVE MIAMI FL 33142 Always verify licenses online at MyFloridaLicense.com JONATHAN ZACHEM, SECRETARYRICK SCOTT, GOVERNOR STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF ARCHITECTURE & INTERIOR DESIGN THE ARCHITECT HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 481, FLORIDA STATUTES COLAO, JOHN G Do not alter this document in any form. 619 E. SHERIDAN ST. LICENSE NUMBER: AR0007260 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. APT. 105 DANIA BEACH FL 33004 Always verify licenses online at MyFloridaLicense.com Licenses & CertificationsBEA Architects, Inc. 39 Halsey Beshears, SecretaryRon DeSantis, Governor STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF ARCHITECTURE & INTERIOR DESIGN THE ARCHITECT HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 481, FLORIDA STATUTES TRUJILLO, ARMANDO Do not alter this document in any form. 7745 SW 52 COURT LICENSE NUMBER: AR0014721 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. MIAMI FL 33143 Always verify licenses online at MyFloridaLicense.com 10050728-AP-BD+C CREDENTIAL ID 13 JUN 2011 ISSUED 10 JUN 2021 VALID THROUGH GREEN BUSINESS CERTIFICATION INC. CERTIFIES THAT Armando Trujillo HAS ATTAINED THE DESIGNATION OF LEED AP® Building Design + Construction by demonstrating the knowledge and understanding of green building practices and principles needed to support the use of the LEED green building program. MAHESH RAMANUJAN PRESIDENT & CEO, U.S. GREEN BUILDING COUNCIL PRESIDENT & CEO, GREEN BUSINESS CERTIFICATION INC. JONATHAN ZACHEM, SECRETARYRICK SCOTT, GOVERNOR STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF ARCHITECTURE & INTERIOR DESIGN THE ARCHITECT HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 481, FLORIDA STATUTES PRICE, ADRIAN Do not alter this document in any form. 8525 SW 126TH TER LICENSE NUMBER: AR97981 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. MIAMI FL 33156 Always verify licenses online at MyFloridaLicense.com Halsey Beshears, SecretaryRon DeSantis, Governor STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF ARCHITECTURE & INTERIOR DESIGN THE ARCHITECT HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 481, FLORIDA STATUTES DRAPER, ROBERT M Do not alter this document in any form. 5410 NW 82 TERR LICENSE NUMBER: AR96257 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. LAUDERHILL FL 33351 Always verify licenses online at MyFloridaLicense.com Licenses & CertificationsBEA Architects, Inc. 40 Licenses & CertificationsNova Consulting, Inc. State of Florida Department of State I certify from the records of this office that NOVA CONSULTING,INC.is a corporation organized under the laws of the State of Florida,filed on May 5, 1995. The document number of this corporation is P95000035314. I further certify that said corporation has paid all fees due this office through December 31,2020,that its most recent annual report/uniform business report was filed on January 22,2020,and that its status is active. I further certify that said corporation has not filed Articles of Dissolution. Given under my hand and the Great Seal of the State of Florida at Tallahassee,the Capital,this the Twenty-second day of January, 2020 Tracking Number:8029590093CC To authenticate this certificate,visit the following site,enter this number,and then follow the instructions displayed. https://services.sunbiz.org/Filings/CertificateOfStatus/CertificateAuthentication 41 Licenses & CertificationsNova Consulting, Inc. Woman & Minority Business Certification Nova Consulting, Inc. 01/02/2020 01/02/2022 42 Licenses & CertificationsNova Consulting, Inc. 8/8/2019 Technical Certificate - Returning Vendor Self-Service Portalhttps://www.miamidade.gov/Vendor/TechnicalCertification/TC_PrintCertificate 1/1Miami-Dade CountyInternal Services DepartmentStatement of Technical Certification CategoriesFirm: HAMMOND & ASSOCIATES INC18800 NW 2nd Avenue, Suite 216, Miami, FL 33169 Approved ByTechnical Certification CommitteeMiami-Dade CountyCodeCategory Description Approval Date Expiration Date4.01 AVIATION SYSTEMS - ENGINEERING DESIGN 12/19/2018 12/31/20205.01 PORT AND WATERWAY SYSTEMS - ENGINEERING DESIGN 12/19/2018 12/31/20208.00 TELECOMMUNICATION SYSTEMS 08/07/2019 12/31/202012.00 GENERAL MECHANICAL ENGINEERING 12/19/2018 12/31/202013.00 GENERAL ELECTRICAL ENGINEERING 12/19/2018 12/31/202017.00 ENGINEERING CONSTRUCTION MANAGEMENT 12/19/2018 12/31/2020MIAMI‐DADE Prequali cation Certi cation FDOT Quali cation Letter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orporation K36503 43 Licenses & CertificationsNova Consulting, Inc. Ron DeSantis, Governor STATE OF FLORIDA BOARD OF PROFESSIONAL ENGINEERS THE ENGINEERING BUSINESS HEREIN IS AUTHORIZED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES NOVA CONSULTING, INC. Do not alter this document in any form. 10486 NW 31 TERRACE LICENSE NUMBER: CA7256 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. DORAL FL 33172 Always verify licenses online at MyFloridaLicense.com Ron DeSantis, Governor STATE OF FLORIDA BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES EAGLE, STEVEN SETH Do not alter this document in any form. 1040 SW 15 AVE LICENSE NUMBER: PE43684 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. MIAMI FL 331355238 Always verify licenses online at MyFloridaLicense.com JONATHAN ZACHEM, SECRETARYRICK SCOTT, GOVERNOR STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES FERRADAZ, RACHEL FRIEDE Do not alter this document in any form. 10486 NW 31ST TERR LICENSE NUMBER: PE74686 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. 10486 NW 31ST TERR MIAMI FL 33172-1215 Always verify licenses online at MyFloridaLicense.com 44 Licenses & CertificationsHammond & Associates, Inc. HAMMOND & ASSOCIATES, INC.Professional EngineersCA5315 ERIC J. HAMMOND, PE PE39048 HAMMOND & ASSOCIATES, INC. Professional Engineers CA5315 ERIC J. HAMMOND, PE PE39048 STEPHEN FAQURHARSON, LEED AP Certi cation DONALD DIXON, PE PE51151 STEPHEN FAQURHARSON, LEED AP Certi cation DONALD DIXON, PE PE51151 45 Licenses & CertificationsHammond & Associates, Inc. 8/8/2019 Technical Certificate - Returning Vendor Self-Service Portal https://www.miamidade.gov/Vendor/TechnicalCertification/TC_PrintCertificate 1/1 Miami-Dade CountyInternal Services DepartmentStatement of Technical Certification Categories Firm: HAMMOND & ASSOCIATES INC 18800 NW 2nd Avenue, Suite 216, Miami, FL 33169 Approved By Technical Certification Committee Miami-Dade County Code Category Description Approval Date Expiration Date 4.01 AVIATION SYSTEMS - ENGINEERING DESIGN 12/19/2018 12/31/2020 5.01 PORT AND WATERWAY SYSTEMS - ENGINEERING DESIGN 12/19/2018 12/31/2020 8.00 TELECOMMUNICATION SYSTEMS 08/07/2019 12/31/2020 12.00 GENERAL MECHANICAL ENGINEERING 12/19/2018 12/31/2020 13.00 GENERAL ELECTRICAL ENGINEERING 12/19/2018 12/31/2020 17.00 ENGINEERING CONSTRUCTION MANAGEMENT 12/19/2018 12/31/2020 MIAMI‐DADE Prequali cation Certi cation FDOT Quali cation Letter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orporation K36503 8/8/2019 Technical Certificate - Returning Vendor Self-Service Portal https://www.miamidade.gov/Vendor/TechnicalCertification/TC_PrintCertificate 1/1 Miami-Dade CountyInternal Services DepartmentStatement of Technical Certification Categories Firm: HAMMOND & ASSOCIATES INC 18800 NW 2nd Avenue, Suite 216, Miami, FL 33169 Approved By Technical Certification Committee Miami-Dade County Code Category Description Approval Date Expiration Date 4.01 AVIATION SYSTEMS - ENGINEERING DESIGN 12/19/2018 12/31/2020 5.01 PORT AND WATERWAY SYSTEMS - ENGINEERING DESIGN 12/19/2018 12/31/2020 8.00 TELECOMMUNICATION SYSTEMS 08/07/2019 12/31/2020 12.00 GENERAL MECHANICAL ENGINEERING 12/19/2018 12/31/2020 13.00 GENERAL ELECTRICAL ENGINEERING 12/19/2018 12/31/2020 17.00 ENGINEERING CONSTRUCTION MANAGEMENT 12/19/2018 12/31/2020 MIAMI‐DADE Prequali cation Certi cation FDOT Quali cation Letter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orporation K36503 8/8/2019 Technical Certificate - Returning Vendor Self-Service Portal https://www.miamidade.gov/Vendor/TechnicalCertification/TC_PrintCertificate 1/1 Miami-Dade CountyInternal Services DepartmentStatement of Technical Certification Categories Firm: HAMMOND & ASSOCIATES INC 18800 NW 2nd Avenue, Suite 216, Miami, FL 33169 Approved By Technical Certification Committee Miami-Dade County Code Category Description Approval Date Expiration Date 4.01 AVIATION SYSTEMS - ENGINEERING DESIGN 12/19/2018 12/31/2020 5.01 PORT AND WATERWAY SYSTEMS - ENGINEERING DESIGN 12/19/2018 12/31/2020 8.00 TELECOMMUNICATION SYSTEMS 08/07/2019 12/31/2020 12.00 GENERAL MECHANICAL ENGINEERING 12/19/2018 12/31/2020 13.00 GENERAL ELECTRICAL ENGINEERING 12/19/2018 12/31/2020 17.00 ENGINEERING CONSTRUCTION MANAGEMENT 12/19/2018 12/31/2020 MIAMI‐DADE Prequali cation Certi cation FDOT Quali cation Letter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orporation K36503 46 MIAMI‐DADE COUNTY SBE (A&E) Licenses & CertificationsHammond & Associates, Inc. MIAMI‐DADE COUNTY SBE (A&E) 47 Licenses & CertificationsPremiere Design Solutions, Inc. State of Florida Department of State I certify from the records of this office that PREMIERE DESIGN SOLUTIONS, INC is a corporation organized under the laws of the State of Florida,filed on June 19,2007,effective June 18,2007. The document number of this corporation is P07000070993. I further certify that said corporation has paid all fees due this office through December 31,2020,that its most recent annual report/uniform business report was filed on January 24,2020,and that its status is active. I further certify that said corporation has not filed Articles of Dissolution. Given under my hand and the Great Seal of the State of Florida at Tallahassee,the Capital,this the Twenty-fourth day of January, 2020 Tracking Number:7376849953CC To authenticate this certificate,visit the following site,enter this number,and then follow the instructions displayed. https://services.sunbiz.org/Filings/CertificateOfStatus/CertificateAuthentication 48 Licenses & CertificationsPremiere Design Solutions, Inc. Minority Business Certification Premiere Design Solutions 09/18/2018 09/18/2020 49 Licenses & CertificationsPremiere Design Solutions, Inc. Ron DeSantis, Governor STATE OF FLORIDA BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES ECKARDT, GUSTAVO A. Do not alter this document in any form. 13301 SW 107 AVENUE LICENSE NUMBER: PE67553 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. MIAMI FL 33176 Always verify licenses online at MyFloridaLicense.com 50 Licenses & CertificationsUniversal Engineering Sciences, LLC 51 Licenses & CertificationsPMM Consulting Engineers, Corp. State of Florida Department of State I certify from the records of this office that PMM CONSULTING ENGINEERS,CORP.is a corporation organized under the laws of the State of Florida,filed on July 16,1987. The document number of this corporation is M55656. I further certify that said corporation has paid all fees due this office through December 31,2020,that its most recent annual report/uniform business report was filed on January 8,2020,and that its status is active. I further certify that said corporation has not filed Articles of Dissolution. Given under my hand and the Great Seal of the State of Florida at Tallahassee,the Capital,this the Eighth day of January,2020 Tracking Number:1222846565CC To authenticate this certificate,visit the following site,enter this number,and then follow the instructions displayed. https://services.sunbiz.org/Filings/CertificateOfStatus/CertificateAuthentication 52 Minority Business Certification PMM Consulting Engineers, Corp. 04/02/2019 04/02/2021 Licenses & CertificationsPMM Consulting Engineers, Corp. 53 Ron DeSantis, Governor STATE OF FLORIDA BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES MARTINEZ, PAUL A. Do not alter this document in any form. 5785 SW 50 ST LICENSE NUMBER: PE42650 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. MIAMI FL 33155 Always verify licenses online at MyFloridaLicense.com Ron DeSantis, Governor STATE OF FLORIDA BOARD OF PROFESSIONAL ENGINEERS THE ENGINEERING BUSINESS HEREIN IS AUTHORIZED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES PMM CONSULTING ENGINEERS, CORP. Do not alter this document in any form. 6262 BIRD RD., SUITE 2 D LICENSE NUMBER: CA9135 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. MIAMI FL 33155 Always verify licenses online at MyFloridaLicense.com Licenses & CertificationsPMM Consulting Engineers, Corp. 54 Licenses & CertificationsCoastal Systems International, Inc. State of Florida Department of State I certify from the records of this office that COASTAL SYSTEMS INTERNATIONAL,INC.is a corporation organized under the laws of the State of Florida,filed on October 14,1994. The document number of this corporation is P94000075733. I further certify that said corporation has paid all fees due this office through December 31,2020,that its most recent annual report/uniform business report was filed on February 18,2020,and that its status is active. I further certify that said corporation has not filed Articles of Dissolution. Given under my hand and the Great Seal of the State of Florida at Tallahassee,the Capital,this the Eighteenth day of February, 2020 Tracking Number:2380502927CC To authenticate this certificate,visit the following site,enter this number,and then follow the instructions displayed. https://services.sunbiz.org/Filings/CertificateOfStatus/CertificateAuthentication 55 Ron DeSantis, Governor STATE OF FLORIDA BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES PEREZ, ANDRES Do not alter this document in any form. 4662 NW 107TH AVE LICENSE NUMBER: PE66507 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. APT 1907 DORAL FL 33178 Always verify licenses online at MyFloridaLicense.com Ron DeSantis, Governor STATE OF FLORIDA BOARD OF PROFESSIONAL ENGINEERS THE ENGINEERING BUSINESS HEREIN IS AUTHORIZED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES COASTAL SYSTEMS INTERNATIONAL INC Do not alter this document in any form. 464 S DIXIE HWY LICENSE NUMBER: CA7087 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. CORAL GABLES FL 331460000 Always verify licenses online at MyFloridaLicense.com Ron DeSantis, Governor STATE OF FLORIDA BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES SASSO, RONALD HARVEY Do not alter this document in any form. C/O COASTAL SYSTEMS INT'L 2ND LICENSE NUMBER: PE35616 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. 464 SOUTH DIXIE HWY MIAMI FL 331460000 Always verify licenses online at MyFloridaLicense.com Licenses & CertificationsCoastal Systems International, Inc. TAB 4 Firm References & Similar Work Completed 57 Firm Experience & Qualifications BEA Architects, Inc., has provided Architectural Design, Planning Services and Drafting Support Services to corporations and institutions worldwide for more than 25 years. The reputation of the firm has been established because of its people, whose experience, qualifications, knowledge, energy, creativity and commitment in every project has helped to fulfill our client’s needs and goals while staying on budget and within time. The firm holds an Architectural License with the State of Florida Department of Business and Professional Regulation, Board of Architecture & Interior Design, as well as a Professional Engineering License with the State of Florida Board of Professional Engineers. BEA counts with 5 Registered Architects in the State of Florida Board of Architecture and Interior Design, who have more than 200 years of combined experience in the Architectural field. Our Architects, some of whom have been part of the firm since it was established, have worked in a variety of Architectural Design and Planning projects, providing planning, designing, permitting, bidding and construction administration services. All of our architects are registered with the National Council of Architectural Registration Boards, and two of them are AIA (American Institution of Architects) members who also hold LEED AP Certifications. BEA also counts with a Technical Support Staff who has all the qualifications, including Masters of Architecture and decades of combined experience, to provide Drafting Support Services. Our team is proficient in all current and recent releases of AutoCAD, BIM, Revit, and all of the Adobe Design products, including but not limited to, Photoshop, Illustrator, InDesign and Premiere. The firm has an outstanding record of successful completion of over 20 Continuing Services Contracts with different cities, organizations and municipalities, in the past 10 years, including: City of Miami Beach, PortMiami, City of North Miami, City of Miami Gardens, Miami-Dade Parks & Recreation, Miami-Dade County Public Schools, Port Canaveral, Port Everglades, among others. The BEA Team consists of the international talents of 30 employees, representing more than 20 different nationalities. Through a collaborative design approach, they arrive at solutions that take into account many influences, resulting in designs that are not pre-established but rather evolve during the design process. BEA Architects | 3075 NW South River Drive, Miami, Florida 33142 | P: 305.461.2053 F: 305.634.0599 | BEAmarketing@beai.com | www.beai.com | FEIN: #65-1020158 BEA Architects, Inc. AWARDS & RECOGNITION AIA Merit Award of Excellence Florida International University Graduate School of Business American Institute of Architects AIA Merit Award of Excellence Turkmenbashi International Seaport Terminal American Institute of Architects Gator 100 Top 10 AI Business Excellence Award for Architecture & Design - California Aquisition International FEFPA Award of Merit Ransom Everglades Aquatic Center Florida Educational Facility Planners Assoc. The Chicago Athenaeum Award Florida International University Graduate School of Business American Architecture Awards FEFPA Award of Merit Florida International University Graduate School of Business Florida Educational Facility Planners Assoc. AIA Merit Award of Excellence Port of Miami Terminals 3, 4 & 5 American Institute of Architects AIA Design Awards Finalist Florida lnternational University Paul L. Cejas School of Architecture American Institute of Architects 58 Organizational Chart BEA ARCHITECTS, Inc. - Architectural Services (MBE) BEA ARCHITECTS, Inc. - Technical Support Team Alejandro Torres M.Arch. - Junior Project Manager Duru Meric M.Arch. - Junior Project Manager Gustavo Santos M.Arch. - Project Designer Patricia Elso M.Arch. - Junior Project ManagerEvelyn Iglesias M.Arch. - Project DesignerIris Sanchez, M.Arch. - Junior Project Designer Bruno-Elias Ramos, AIA, GC, NCARB, LEED AP BD+CPrincipal-in-Charge, Project Manager Armando Trujillo, AIA, LEED AP BD+CVice-President, Deputy Project Manager John Colao, AIA, GC, NCARBSenior Architect, Planning & Project Coordinator, QA / QC Adrian Price, RA, NCARBVice-President, Cost Estimating & Scheduling Mario F. Ortega, M.Arch., MSASDirector of Design Robert Draper, RA, NCARBSenior Architect, Compliance Reviews Nova Consu;ting, Inc.Civil Engineering, Leak Detection Studies & Construction Engineering and Inspection (CEI) Services (MBE) Steven S. Eagle, PESenior Vice President, Chief of Engineering Rachel Ferradaz, PEProject Controls Engineer / Scheduler Luis DantesConstruction Field Representative Valeska ColmenaresStaff Engineer Hammond & Associates, Inc.Electrical, Mechanical, HVAC & Plumbing Engineering (SBE) Eric J. Hammond, PEPrincipal, Mechanical Engineer Stephen Farquharson, LEED APEngineering Manager, Electrical Engineer Donald Dixon, PEElectrical Engineer Premiere Design Solutions, Inc.Surveying and Mapping Gustavo Eckardt, PESurvey Project Manager Fernando Fernandez, PSMSurveying Lead Jorge Michel OlmoSurveying | CAD Technician Universal Engineering Sciences, LLCGeotechnical Engineering & Materials Sampling and Testing Peter G. Read, PERegional Manager | Geotechnical Consultant Reinaldo Villa, MS, PEMiami Branch Manager, Senior Geotechnical Engineer Steve Jaime, EIStaff Engineer Coastal Systems International, Inc.Environmental Engineer & Sea Level Rise Consultant R. Harvey Sasso, PEPresident Andres Perez, PEEngineering Director Megan ReisingSenior Environmental / Permitting Project Manager Taylor ScheuermannEnvironmental / Permitting & Resiliency Project Manager PMM Consulting Engineers, Corp.Structural Engineering(SBE) Paul A. Martinez, PEPrincipal / Senior Structural Engineer Manuel J. Herrera, EITStructural Engineer Yasel SosaStructural Drafter 59 Resumes • Miami Beach Historic City Hall Renovations, Miami Beach, FL• Pelican Harbor Marina Dockmaster Facility with Parking, Miami-Dade County, FL• Florida International Terminal Office Building, Port Everglades, FL• Opa-Locka Tri-Rail Station, Opa-Locka, FL MASTER PLANNING PROJECTS • City of Miami Gardens Parks Master Plan, Miami Gardens, FL• Spring Garden Point Park Master Plan, Miami, FL• IMG Crandon Park Tennis Center Master Plan & Expansion, Key Biscayne, FL• Destination 305 Master Plan, Miami, FL• GalataPort Master Plan, Mixed-Use Development with Cruise Terminal, Istanbul, Turkey• Port of Krabi Pier Master Plan, Krabi, Thailand• Port of Nassau, Cruise / Waterfront Master Plan, Nassau, Bahamas• RCI Port of Nishikomi Master Plan, Nishikomi, Japan• St. John’s Antigua Master Plan, St. John’s, Antigua• Port Planning & Conceptual Design, Puerto Plata, Dominican Republic• Puerto La Cruz Waterfront Master Plan, Puerto La Cruz, Venezuela• Panama City Cruise Port Master Plan, Panama City, FL With a Master of Architecture from the University of Florida and over 30 years of experience as an industry leader in innovative state-of-the-art facilities in planning and design, Bruno-Elias Ramos, AIA, has set a high bar for industry standards. As BEA Architects Principal-in-Charge and Lead Project Manager, he has successfully been part of and completed over more than 20 continuing services contract in the last 10 years, with different municipalities and counties throughout South Florida, including but not limited to, City of Miami Beach, City of Miami Gardens, City of North Miami, City of West Palm Beach, City of Hialeah, and more. Mr. Ramos has also served as an architect and consultant to a variety of projects ranging from education, master plans, mixed-use facilities, cruise lines and has participated in planning international seaports and mixed-use waterfront developments. As a Registered Architect in the State of Florida, Georgia, Massachusetts, Virginia, Texas and Louisiana, his talent and industry knowledge have been repeatedly solicited to add value to every world-renowned cruise and cargo port in the US, as well as maritime and planning projects worldwide. Bruno-Elias Ramos, AIA, GC,NCARB, LEED AP Principal-in-Charge, Project Manager REGISTRATIONS Registered Architect: Florida AR 0012160 Registered Architect: Georgia RA015956 Registered Architect: Massachusetts 30955 Registered Architect: Virginia 0401013334 Registered Architect: Texas 24346 Registered Architect: Louisiana 8414 General Contractor: Florida CG-C033989 NCARB Certification: No. 53,136 SAVE International 40456 EDUCATION Master of Architecture University of Florida PROFESSIONAL AFFILIATIONS American Institute of Architects #30061351 LEED Accredited Professional AWARDS Gator 100 Top 10 AIA Merit Award of ExcellenceAmerican Institute of Architects FEFPA Award of MeritFlorida Educational Facility Planners ARCHITECTURE & ENGINEERING CONTINUING SERVICES CONTRACT • City of North Miami• City of Miami Beach• City of Miami Gardens• City of Homestead• City of West Palm Beach• City of Fort Lauderdale• City of Hialeah• Fort Lauderdale Airport• Florida International University• PortMiami• Port of Tampa• Port of West Palm Beach• Port Canaveral• Port Everglades• Palm Beach County• Miami-Dade Parks & Recreation• Miami-Dade Aviation Department• Miami-Dade County Public Schools MUNICIPAL & CIVIC FACILITIES PROJECTS • MoCA Courtyard Improvements, Miami, FL• Pinecrest Library & Community Center, Pinecrest, FL• Miami Beach City Hall Facade Renovation, Miami Beach, FL• Homestead Community Center, Homestead, FL• HOPE IV Grant Proposal, Master Plan & Community Center, Miami-Dade County, FL• Jupiter Library, Jupiter, FL• Miami Beach Bandshell Park Facilities Renovations, Miami Beach, FL 60 • Florida International Terminal Office Building, Port Everglades, FL• Opa-Locka Tri-Rail Station, Opa-Locka, FL MASTER PLANNING PROJECTS • City of Miami Gardens Parks Master Plan, Miami Gardens, FL• Spring Garden Point Park Master Plan, Miami, FL• IMG Crandon Park Tennis Center Master Plan & Expansion, Key Biscayne, FL• Destination 305 Master Plan, Miami, FL• GalataPort Master Plan, Mixed-Use Development with Cruise Terminal, Istanbul, Turkey• Port of Krabi Pier Master Plan, Krabi, Thailand• Port of Nassau, Cruise / Waterfront Master Plan, Nassau, Bahamas• RCI Port of Nishikomi Master Plan, Nishikomi, Japan• St. John’s Antigua Master Plan, St. John’s, Antigua PARKS & RECREATION PROJECTS • Harris Field Park Restrooms & Covered Walkway, Homestead, FL• Crandon Park Cabanas Rehabilitation, Key Biscayne, FL• Miami Beach Botanical Gardens, Miami Beach, FL• Improvements & Upgrades to County Park Facilities, Miami-Dade County, FL• City of Miami Gardens Parks Master Plan, Miami Gardens, FL• Spring Garden Point Park Master Plan, Miami, FL• South Olive Park & Recreational Facility, West Palm Beach, FL• Coleman Park Recreation Center, West Palm Beach, FL John Colao has over 30 years of architectural and construction experience, ranging from design to on-site construction management. As Principal Associate and licensed General Contractor of BEA Architects, Mr. Colao manages large scale public and private sector projects involving schools and universities, parks, cruise terminals, retail facilities, office buildings, and warehouses. He is an expert in constructability reviews, code analysis and interdisciplinary coordination. He ensures the quality control during all phases of the projects, but more specifically during the construction phase, with expertise in code requirements and coordinating a variety of engineering disciplines. John Colao, AIA, GC, NCARB Senior Architect, Planning & Project Coordinator, QA/QC REGISTRATIONS Registered Architect: Florida AR 0007260 Registered Architect: Louisiana 8414 General Contractor: Florida CG-C016746 NCARB Certification No. 19768 Real Estate License: Florida SL 0348243 EDUCATION Bachelor of Architecture with Honors University of Miami PROFESSIONAL AFFILIATIONS American Institute of Architects #30048842 Greater Miami Chamber of Commerce ARCHITECTURE & ENGINEERING CONTINUING SERVICES CONTRACT • City of North Miami• City of Miami Beach• City of Miami Gardens• City of Homestead• City of West Palm Beach• City of Fort Lauderdale• City of Hialeah• Fort Lauderdale Airport• Florida International University• PortMiami• Port of Tampa• Port of West Palm Beach• Port Canaveral• Port Everglades• Palm Beach County• Miami-Dade Parks & Recreation• Miami-Dade Aviation Department• Miami-Dade County Public Schools MUNICIPAL & CIVIC FACILITIES PROJECTS • Pinecrest Library & Community Center, Pinecrest, FL• Miami Beach City Hall Facade Renovation, Miami Beach, FL• Homestead Community Center, Homestead, FL• HOPE IV Grant Proposal, Master Plan & Community Center, Miami-Dade County, FL• Jupiter Library, Jupiter, FL• Miami Beach Bandshell Park Facilities Renovations, Miami Beach, FL• Miami Beach Historic City Hall Renovations, Miami Beach, FL• Miami-Dade Housing Regions I & III ADA/UFAS Compliance, Miami-Dade County, FL• Pelican Harbor Marina Dockmaster Facility with Parking, Miami-Dade County, FL Resumes 61 MASTER PLANNING PROJECTS • City of Miami Gardens Parks Master Plan, Miami Gardens, FL• Spring Garden Point Park Master Plan, Miami, FL• IMG Crandon Park Tennis Center Master Plan & Expansion, Key Biscayne, FL• Destination 305 Master Plan, Miami, FL• GalataPort Master Plan, Mixed-Use Development with Cruise Terminal, Istanbul, Turkey HISTORICAL PROJECTS • Hass Property - Village of Palmetto Bay Park by the Bay, Palmetto Bay, FL• Ward Rooming House, Miami, FL • University of Miami Memorial Building Interior and Exterior Remodeling, Miami, FL • Historic Hampton House, Miami-Dade County, FL COMERCIAL AND OFFICE BUILDINGS PROJECTS • Banque de Luxembourg Corporate Headquarters, Luxembourg City, Luxembourg • Phoenix Tower,Houston, Texas • One West Chase, Houston, Texas • Greenspoint Center, Houston, Texas Armando Trujillo has over 32 years of experience as a registered architect in the State of Florida and Texas, managing a wide variety of architectural projects with direct responsibility and accountability for day-to-day operations and performance of the project team. As the Deputy Project Manager, Mr. Trujillo is responsible for assessing and verifying contractual compliance on projects. His experience includes aviation, federal projects, higher education, cruise terminals, ports, cargo, hospitality and other commercial work. Mr. Trujillo brings a wealth of experience and knowledge to any new project and is known for his influential leadership and mentoring qualities. Mr. Trujillo has been part of the BEA team for almost 5 years adding great significance of value to all of his projects thanks to his international experience. Armando Trujillo, AIA, LEED AP BD+C Vice-President, Deputy Project Manager REGISTRATIONS Registered Architect: Florida AR 0014721 Registered Architect: Texas No. 10468 EDUCATION Bachelor of Architecture University of Houston PROFESSIONAL AFFILIATIONS LEED Accredited Professional American Institute of Architects #38269901 ARCHITECTURE & ENGINEERING CONTINUING SERVICES CONTRACT • City of North Miami• City of Miami Beach• City of Miami Gardens• City of Homestead• City of West Palm Beach• City of Fort Lauderdale• City of Hialeah• Fort Lauderdale Airport• Florida International University• PortMiami• Port Canaveral• Port Everglades• Miami-Dade Parks & Recreation• Miami-Dade Aviation Department• Miami-Dade County Public Schools MUNICIPAL & CIVIC FACILITIES PROJECTS • MoCA Courtyard Improvements, Miami, FL • The North Shore Tennis Center Improvements, Miami Beach, FL • United States Embassy, Lima, Peru • C.E. Bennet Federal Office Building, Jacksonville, FL • Government Center West, Fort Lauderdale, FL • Internal Revenue Service Regional Compliance Center, Austin, TX • United States Embassy, Colombo, Sri Lanka • Hollywood Police Crime Lab Renovation, Hollywood, FL • Gibson Park Phase I, Miami, FL • Wynwood Neighborhood Service Center, Miami-Dade County, FL Resumes 62 • Port Roadway Master Plan & Gatehouse for PortMiami, Miami, FL • St. John’s Antigua Master Plan, St. John’s, Antigua PARKS & RECREATION PROJECTS • City of Miami Gardens Parks Master Plan, Miami Gardens, FL • Miami Beach Bandshell Park Facilities Renovations, Miami Beach, FL • Miami Beach Botanical Gardens, Miami Beach, FL EDUCATION PROJECTS • Ransom Everglades School Language Building Renovations, Coconut Grove, FL • Ransom Everglades School Math & Science Building Renovations, Coconut Grove, FL• Ransom Everglades School Auditorium, Coconut Grove, FL SPORTS PROJECTS • Ransom Everglades School Aquatic Center, Coconut Grove, FL • IMG Crandon Park Tennis Center Renovation and Master Plan, Key Biscayne, FL Vice President Adrian Price holds a Master of Architecture from Florida International University and plays a vital leadership role in BEA ventures. As a Registered Architect in the State of Florida and with over 10 years of experience in Municipal and Educational Projects. His ability to analyze and solve project specific problems has proven to be an asset in providing our clients with thoughtful insight and the critical thinking approach BEA is known for. Mr. Price has been repeatedly recognized and awarded during both his academic and professional tenure. Mr. Price is an exemplary team leader who also manages the Scheduling and Cost Estimating of all kinds of projects projects, to ensure the successful and timely delivery of projects within budget. He has successfully managed and led teams through various complex Architectural and Engineering, Planning and Consulting project types using different delivery methods. His specialties in software include Microsoft Project, AutoCAD and BIM, Adobe Photoshop, Illustrator and InDesign and AIA Documents. Adrian Price, RA, NCARB Vice-President, Cost Estimates & Scheduling REGISTRATIONS Registered Architect: Florida AR 97981 NCARB Certification No. 83552 EDUCATION Master of Architecture Florida International University Bachelor of Arts of Architectural Studies [Honors] University of Technology (Jamaica) Caribbean School of Architecture AWARDS Academic Excellence Award Florida International UniversityTau Sigma Delta Bronze Medal Tau Sigma DeltaHonor Society ofArchitecture & Alied Arts ARCHITECTURE & ENGINEERING CONTINUING SERVICES CONTRACT • City of North Miami• City of Miami Beach• City of Miami Gardens• City of Homestead• City of West Palm Beach• City of Fort Lauderdale• City of Hialeah• Florida International University• PortMiami• Port Canaveral• Port Everglades MUNICIPAL & CIVIC PROJECTS • Bandshell Park Facilities Renovations, Miami Beach, FL • Pelican Harbor Marina Dockmaster Facility with Parking, Miami-Dade County, FL • Florida International Terminal Office Building, Port Everglades, FL • Miami Beach Historic City Hall Renovations, Miami Beach, FL • MoCA Courtyard Improvements, Miami, FL MASTER PLANNING PROJECTS • Port of Krabi Pier Master Plan, Krabi, Thailand • Port of Nassau Cruise and Waterfront Master Plan, Nassau, Bahamas • Port of Nishikomi Master Plan, Nishikomi, Japan Resumes 63 • Pelican Harbor Marina Dockmaster Facility with Parking, Miami-Dade County, FL • Florida International Terminal Office Building, Port Everglades, FL • Opa-Locka Tri-Rail Station, Opa-Locka, FL MASTER PLANNING PROJECTS • City of Miami Gardens Parks Master Plan, Miami Gardens, FL• IMG Crandon Park Tennis Center Master Plan & Expansion, Key Biscayne, FL• Destination 305 Master Plan, Miami, FL• GalataPort Master Plan, Mixed-Use Development with Cruise Terminal, Istanbul, Turkey• Port of Krabi Pier Master Plan, Krabi, Thailand• St. John’s Antigua Master Plan, St. John’s, Antigua PARKS & RECREATION PROJECTS • 1111 Lincoln Road Mixed-Use Complex with Parking, Miami Beach, FL • 8699 Biscayne Mixed-Use Development, Miami, FL • Harris Field Park Restrooms & Covered Walkway, Homestead, FL • Crandon Park Cabanas Rehabilitation, Key Biscayne, FL • Miami Beach Botanical Gardens, Miami Beach, FL • City of Miami Gardens Parks Master Plan, Miami Gardens, FL Robert Draper is a highly experienced design professional and registered architect with over 15 years of hands-on experience in a wide variety of projects, such as, performing art centers, education, sports, municipal, cruise terminals, and more. Although Mr. Draper has been involved in a myriad of projects at almost every level, one of his areas of expertise includes marine, cargo and transportation facilities. On a daily basis, Mr. Draper will develop design concepts, provide cost estimating, design consultation, prepare construction documents and specifications, as well as act as a general source of architectural knowledge. He is assigned to control certain projects from start to finish to ensure high quality, innovative and functional design. Mr. Draper is capable of handling different types of projects, from Design Criteria Packages, Design-Build, Design-Bid-Build, CM-at-Risk, and more. Robert Draper, RA, NCARB Senior Architect, Compliance Reviews REGISTRATIONS Registered Architect: Florida AR96257 NCARB Certification: No. 74968 EDUCATION Bachelor of Architectural Design Florida International University ARCHITECTURE & ENGINEERING CONTINUING SERVICES CONTRACT • City of North Miami• City of Miami Beach• City of Miami Gardens• City of Homestead• City of West Palm Beach• City of Fort Lauderdale• City of Hialeah• Fort Lauderdale Airport• Florida International University• PortMiami• Port of Tampa• Port of West Palm Beach• Port Canaveral• Port Everglades• Palm Beach County• Miami-Dade Parks & Recreation• Miami-Dade Aviation Department• Miami-Dade County Public Schools MUNICIPAL & CIVIC FACILITIES PROJECTS • The North Shore Tennis Center Improvements, Miami Beach, FL • Pinecrest Library & Community Center, Pinecrest, FL • Miami Beach City Hall Facade Renovation, Miami Beach, FL • Homestead Community Center, Homestead, FL • Miami Beach Bandshell Park Facilities Renovations, Miami Beach, FL • Miami Beach Historic City Hall Renovations, Miami Beach, FL • Virginia Key Beach Historical Museum, Miami, FL Resumes 64 MASTER PLANNING PROJECTS • Destination 305 Master Plan, Miami, FL• Galataport Master Plan & Mixed-Use Development with Cruise Terminal, Istanbul, Turkey• Panama City Cruise Port Master Plan, Panama City, FL• Port of Krabi Pier Master Plan, Krabi, Thailand• Port of Nishikomi Master Plan, Nishikomi, Japan• Port Planning & Conceptual Design, Puerto Plata, Dominican Republic• Puerto La Cruz Waterfront Master Plan, Puerto La Cruz, Venezuela• St. John’s Antigua Master Plan, St. John’s, Antigua PARKS & RECREATION PROJECTS • Crandon Park Cabanas Rehabilitation, Key Biscayne, FL• Miami Beach Botanical Gardens, Miami Beach, FL• Improvements & Upgrades to County Park Facilities, Miami-Dade County, FL• City of Miami Gardens Parks Master Plan, Miami Gardens, FL• Spring Garden Point Park Master Plan, Miami, FL• South Olive Park & Recreational Facility, West Palm Beach, FL• Coleman Park Recreation Center, West Palm Beach, FL Mario F. Ortega is a Senior Design Architect at BEA Architects with over 20 years of experience. During his professional practice, Mr. Ortega has been the project designer on international and domestic award-winning projects all over the world. He is an Endowed Teaching Chair Recipient and Tenured Professor at the Miami Dade College (MDC) School of Architecture. Mr. Ortega’s accomplishments as an architectural professional and as a professor of architecture continue to be recognized by the American Institute of Architects Miami Chapter. He is the first and only MDC School of Architecture professor to be honored with the AIA Miami Chapter Education Leadership Award. A prolific writer, Mr. Ortega has also published over seven books, of which he has received two awards from the AIA Miami Chapter, on the subject of architecture. Mr. Ortega is also the recipient of the Col. Mitchell Wolfson, Sr. Endowed Teaching Chair. Mario F. Ortega, M.Arch., MSAS Director of Design EDUCATION Master of Architecture University of Florida Bachelor of Architecture University of Florida Master of Science in Architecture Pedagogy (MSAS) University of Florida AWARDS AIA Excellence in Design Award American Institute of Architects Miami Chapter MDC Col. Mitchell Wolfson Endowed Teaching Chair Award Miami Dade College AIA Education Leadership Award American Institude of Architects Miami Chapter AIA Writing About Architecture Award American Institute of Architects Miami Chapter ARCHITECTURE & ENGINEERING CONTINUING SERVICES CONTRACT • City of North Miami• City of Miami Beach• City of Miami Gardens• City of Homestead• City of West Palm Beach• City of Fort Lauderdale• City of Hialeah• Fort Lauderdale Airport• Florida International University• PortMiami• Port of Tampa• Port of West Palm Beach• Port Canaveral• Port Everglades• Palm Beach County• Miami-Dade Parks & Recreation• Miami-Dade Aviation Department• Miami-Dade County Public Schools MUNICIPAL & CIVIC FACILITIES PROJECTS • MoCA Courtyard Improvements, Miami, FL• Pinecrest Library & Community Center, Pinecrest, FL• Miami Beach City Hall Facade Renovation, Miami Beach, FL• Homestead Community Center, Homestead, FL• Jupiter Library, Jupiter, FL• Miami Beach Bandshell Park Facilities Renovations, Miami Beach, FL• Florida International Terminal Office Building, Port Everglades, FL• Opa-Locka Tri-Rail Station, Opa-Locka, FL Resumes 65 ResumesNova Consulting, Inc. 1 Steven S. Eagle, PE Sr. Vice President / Chief of Engineering Mr. Eagle has more than 35 years of experience in the fields of civil and water resources engineering. His work includes detailed design, quality assurance/quality control, value engineering and overall project management and supervision for private and public-sector projects. He has completed civil engineering designs and performed construction management services for projects associated with infrastructure rehabilitation of public works, public utility facilities, and commercial and residential facilities entailing new construction and rehabilitation. Relevant Experience Metrorail Center Control Upgrade, Miami-Dade Transit, Miami, FL. The Metrorail Control Center (MRCC) is located on the fifth floor level of the Stephen P. Clark Government Center. This project entails the development of existing office space to accommodate the modernization of the existing Central Control Facility and systems, including the heating, ventilation and air conditioning (HVAC) system on the 3rd, 4th and 5th floors, power distribution units, uninterruptible power supplies, electrical systems, and existing systems hardware and software. As part of this project, Nova provided cost estimating, scheduling and claims management services, civil engineering and facilities design services as well as environmental engineering services, consisting of limited oversight of pre-renovation asbestos abatement activities (i.e., complete removal, proper disposal and sealing off of the area). Lehman Yard Rehabilitation and Lehman Center Test Track, Miami-Dade Transit, Miami, FL. The Lehman Yard Rehabilitation project consists of construction of five (5) new storage tracks and two (2) Maintenance of Way tracks in the existing Lehman Yard. Nova provided project controls and scheduling, and inspections to ensure the contractor complies with environmental regulations during construction in connection with petroleum contaminated soil and water. Nova also assisted with ERP permit closure with SFWMD. The Lehman Center Test Track: This project consisted of the construction of a new 2,500 feet long test track at the existing Metrorail Lehman Center Facility. Nova provided construction engineering and inspection services. Palmetto Station Traction Power Sub-Station, Miami-Dade Transit, Miami, FL. The project involves the design, construction and installation of a new Traction Power Substation at the existing Palmetto Station. Nova provided cost estimating, scheduling, claims management services, and construction inspection services. Pump Station Improvement Program, Miami-Dade Water & Sewer Department, FL. Under the terms of a consent decree, Miami- Dade will rehabilitate its wastewater treatment plants and sewer collection and transmission system. Under this program, the objective is to refurbish approximately 109 sewage pump stations to comply in meeting a nominal average pumping operating time of less than 10 hours per day. Nova was selected as the Program Managers to administer and manage the implementation of the PSIP initiatives. Mr. Eagle serves as Technical Director. Alexander Orr Water Treatment Plant, South Miami Heights Site Improvement, Miami-Dade Water and Sewer Department, FL. The Miami-Dade Water and Sewer Department (WASD) requested engineering services in connection with the relocation of the Division staff from their existing offices at the South District Wastewater Treatment Plant (SDWWTP) to a new trailer complex to be Education MS, Sanitary Engineering, Syracuse University, 1979 BS, Civil Engineering, Syracuse Engineering, 1977 Credentials | Registrations Licensed Professional Engineer FL (43684) OSHA’s HAZWOPER Supervisor/Management Professional Organizations American Society of Civil Engineers National Society of Professional Engineers Florida Engineering Society American Water Works Association Expertise Water and Wastewater Resources Hydraulic and Hydrologic Planning Project Management Program Management Independent Peer Review Pump Station Design Instrumentation & Control 66 ResumesNova Consulting, Inc. Steven S. Eagle, PE │ Sr. Vice President / Chief of Engineering 2 located at the South Miami Heights Water Treatment Plant (SMHWTP) site. This project involves providing engineering design services related to general civil, drainage, electrical site lighting, parking, site striping and overall site plan. As Engineer or Record, Mr. Eagle was responsible for preparing all permitting forms and documentation and obtaining the required permit approvals for the project, as well as providing engineering services during construction as required, including review of contractor submittals such as shop drawings, change orders, and requests for information, and project final certification. Pipeline Design from South District Wastewater Treatment Plant to the South District Water Reclamation Plant, Miami-Dade Water & Sewer Department, FL. This project included the large diameter piping design as part of the influent pipeline design from the South District Wastewater Treatment Plant to the Water Reclamation Plant, including a canal crossing through micro-tunnel, together with driving and receiving pits. Nova provided piping design, project management, cost estimating and scheduling during construction, utility coordination, and permit processing. As Technical Director and Engineer of Record, Mr. Eagle provided design, project supervision, and QA/QC of project deliverables. South Miami Heights Water Treatment Plant, Miami-Dade Water & Sewer Department, FL. The original proposed water treatment plant included membrane buildings, reservoirs, a multi-purpose building with raw water booster pumps, strainers, bulk chemical storage, sodium hypochlorite; an electrical generator switch building, and a high service pumping station. The treatment plant facilities were designed to process 26 MGD of raw water. Presently MDWASD is revamping the plant process to use water extracted from the Upper Floridian Aquifer as the raw water source. In addition, they are considering enhancement of the original design to reflect potential sea level rise over the next 50 years. As Technical Director, Mr. Eagle originally provided engineering design associated with wastewater pollution and transmission system and stormwater drainage and participated in the preparation of the new design/build criteria package. South Miami Heights Water Treatment Plant, Reverse Osmosis Pilot Study, Miami-Dade Water & Sewer Department, FL. This pilot study tested the efficiencies of several reverse osmosis (RO) membrane manufacturers at removing hardness, nitrate, and salinity, while observing the fouling potential of each membrane during operation. Mr. Eagle served as Project Manager; his tasks included coordinating and supervising Nova’s team in charge of data collection, analysis, and interpretation. South Miami Heights Water Treatment Plant, Intersection Improvements, Miami-Dade Water & Sewer Department, FL. This project consisted of engineering design services for the intersection of SW 117 Avenue and SW 114 Court and crosswalks on the intersection of SW 208 Street and SW 117 Avenue. Specific responsibilities included as-built drawings, maintenance of traffic (MOT) plans, field inspection, and project coordination. Mr. Eagle was the Project Manager and the Engineer of Record responsible for the design and project supervision. South Miami Heights Water Treatment Plant, Design of Pump Station No. 951, Miami-Dade Water & Sewer Department, FL. The proposed pump station system consisted of approximately 990 linear-feet of 8-inch gravity sewers, a new/relocated pump station and with a discharge via a 4-inch force main to the existing 20-inch force main. Mr. Eagle served as Engineer of Record. Alexander Orr Jr. Water Treatment Plant, Miami-Dade Water and Sewer Department, FL. Mr. Eagle served as Project Manager responsible for a Process Optimization Study to evaluate alternatives to improve the efficiency of the lime softening and stabilization process, with the intent of reducing operational costs for the facility. Scope of work included raw water characterization, review and documentation of the raw water supply and lime softening in the form of drawings, specifications, and operation and maintenance manuals, bench scale testing, and cost analysis. North, Central, and South Regional Sewer Pump Stations Hydraulic Model Calibration, Miami-Dade Water & Sewer Department, FL. This project consisted of investigation and evaluation of errors, inconsistencies or anomalies shown by the hydraulic model for several pump stations at the North, Central and South Regional Sewer Pump Stations in order to calibrate the hydraulic model as required. As Technical Director, Mr. Eagle was responsible for overseeing the analysis of the potential sources of e rror and possible solutions in order to calibrate the hydraulic model as required. 67 ResumesNova Consulting, Inc. Rachel Ferradaz, PE Project Controls Engineer / Scheduler Ms. Ferradaz has over 20 years of experience in the fields of civil engineering and construction management for municipal and industrial infrastructure projects. Most recently, she has provided project controls on various civil/municipal construction projects. She has been responsible for critical path scheduling, time impact/delay analysis, budgeting and forecasting costs/schedules, reviewing change orders and negotiations, cost estimating, work quality/progress monitoring, and claims mitigation. Additionally, her past project design experience has included wastewater treatment plants, water facilities, pumping stations, transit, and utility infrastructures. Relevant Experience Pump Station Improvement Program (PSIP), Miami-Dade Water & Sewer Department, FL. Under the terms of a consent decree, Miami-Dade is rehabilitating its wastewater treatment plants and sewer collection and transmission system. Nova was selected to administer and manage the implementation of the PSIP to ensure timely repair of upgrades. Ms. Ferradaz served as the initial Program Controls Lead involved in the sequencing and scheduling an effective implementation of the design and construction components of the program. Design/Build Miami Dade College Hialeah Garage, Miami Dade College District Board of Trustees of, FL. The project consisted of the design/build of a new parking garage facility on Miami Dade College Hialeah Campus. Nova’s tasks included site and civil design for the facility, as-built information for existing utilities, designing connections to portable water and sanitary sewer service, as well as drainage, paving and grading design for the parking garage and associated facilities. As Assistant Project Manager, Ms. Ferradaz was responsible for engineering design, project management, and permitting. C-44 System Discharge & Stormwater Treatment Areas, South Florida Water Management District, FL. The C-44 Reservoir/STA project is a component of the Indian River Lagoon-South (IRL-South) Project under the Comprehensive Everglades Restoration Plan. The C-44 project consists of a reservoir and stormwater treatment areas (STAs) located on an approximately 12,000 acre site. Ms. Ferradaz was Project Controls. 60-Inch Force Main Installation under Norris Cut Channel, Miami-Dade Water & Sewer Department, FL. This project involves the replacement of a 54-inch force main with a 60-inch force main, in preparation of the Federal Navigational Dredging Project; the force main was successfully installed via a 72-inch diameter micro-tunnel. Government Cut Channel Utility Relocation Projects, Miami-Dade Water & Sewer Department, FL. This Design/Build project involved two pipeline relocations, a 54-inch wastewater force main installed under Government Cut channel via micro-tunnel trenchless technology, and a 20-inch water main underneath Fisherman’s Channel. As part of the Construction Management/Inspection Team, Ms. Ferradaz was responsible for scheduling, cost estimating, contract compliance review, and development/implementation of the document control plan for the construction team. Education BS, Civil Engineering, Florida State University, 2000 Credentials | Registrations Licensed Professional Engineer, FL (74686), NY (102066) Lorman Certifications for Construction Delay Claims FIU Certification for Construction Claims Sanitary Sewer System Collection, Transmissions & Treatment Capacity – MDWASD Certification Condition Assessment/Remaining Service Life of Water Distribution Mains – AWWA FL Continuing Education E-builder Advanced Cost Management Training (in progress) Applications Primavera P3, P6 Microsoft Project Asta Powerproject E-builder Professional Organizations American Society of Civil Engineers Expertise Civil Engineering Water and Wastewater Resources Project Management Construction Management Project Controls Scheduling Cost Estimating Claims Analysis Management Experience Nova Consulting – 15 years Bechtel – 5 years 68 Rachel Ferradaz, PE │ Project Controls Engineer / Scheduler 2 South Miami Heights Water Treatment Plant Design of Upper Floridian/Biscayne Aquifer, Miami-Dade Water & Sewer Department, FL. The South Miami Heights Water Treatment Plant was developed as a reverse osmosis treatment facility to provide 20 MGD of drinking water, utilizing raw water extracted from the Biscayne Aquifer. The project objective is to revamp the plant process to use ware extracted from the Upper Floridian Aquifer as the raw water source. Ms. Ferradaz serves as Project Manager on Nova’s assistance with the Design Criteria Package. Central District Wastewater Treatment Plant Headwork Facilities Upgrades, Miami Dade Water & Sewer Department. This project consisted of upgrades to the headwork facilities at the plant’s process treatment streams. Nova was responsible for the process mechanical design criteria, permitting coordination, and the Basis of Design Report; consisting of conceptual drawings through BIM. Ms. Ferradaz served as Sr. Principal Engineer. South District Wastewater Treatment Plant Digester Facility Rehabilitation, Miami-Dade Water & Sewer Department, FL. This project consists of the rehabilitation to the plant’s gas phase digesters. Nova is responsible for the design of the digesters’ recirculation pumps, heat exchangers, transfer pumps, blowers, floating covers, and associated piping and appurtenances. Ms. Ferradaz serves as Sr. Principal Engineer. Central District Wastewater Treatment Plant Master Pump Station 2 Upgrades, Miami-Dade Water & Sewer Department, FL. This Miami-Dade Water & Sewer Department project consists of design services for the Master Pump Station 2 (MPS2) upgrades, which will maintain pump during periods of high flow at the Central District Wastewater Treatment Plant. Nova is responsible for the detailed design of the mechanical, structural and general design drawings, technical specifications, and construction documents. Ms. Ferradaz served as Project Manager. Central District Wastewater Treatment Plant Injection Well Pump Station Design, Miami-Dade Water & Sewer Department, FL. The project entails the design and permitting of a new injection well pump station. Under a previous task order Nova was responsible for the process mechanical, preliminary design drawings, and regulatory requirements included in the BODR. Currently, Nova is completing the detailed design and development of final design documents for bidding. Ms. Ferradaz serves as Sr. Principal Engineer. Central District Wastewater Treatment Plant Return Activated Sludge (RAS) Pump Station Improvements, Miami-Dade Water & Sewer Department, FL. The project entailed the rehabilitation and repair of the RAS pump station at the Central District Wastewater Treatment Plant. Nova participated in the mechanical and HVAC detailed design drawings and specifications, project management and coordination, and quality control. Ms. Ferradaz serves as Sr. Principal Engineer. South Miami Heights Water Treatment Plant, Miami-Dade Water & Sewer Department, FL. The proposed water treatment plant design included membrane buildings, reservoirs, a multi-purpose building raw water booster pumps, strainers, bulk chemical storage, sodium hypochlorite, electrical generator switch building, and a high service pumping station. As Cost Estimator, Ms. Ferradaz worked on updating the cost estimate for the planned activities. Pipeline Design from South District Wastewater Treatment Plant to the South District Water Reclamation Plant, Miami-Dade Water & Sewer Department, FL. This project included the large diameter piping design as part of the influent pipeline design from the South District Wastewater Treatment Plan to the Water Reclamation Plant, including a canal crossing through micro-tunnel, together with driving and receiving pits. As Assistant Project Manager, Ms. Ferradaz was responsible for design, utility coordination, and cost estimating. South District Wastewater Treatment Water Reclamation Plant, Reclaimed Water Conveyance System, Miami-Dade Water & Sewer Department, FL. The proposed 9.5 mile, 42” conveyance system was envisioned to run from the South District Wastewater Treatment Water Reclamation Plant to a groundwater recharge facility located near the Metro Zoo area. Scope of services included preliminary hydraulic analysis, identification of all necessary permits and potential environmental impacts. Nova provided the ResumesNova Consulting, Inc. 69 Rachel Ferradaz, PE │ Project Controls Engineer / Scheduler 3 conceptual design of the discharge system into the Metro Zoo area, finalization of the BODR, and design of the 42” pipeline. As Project Manager, Ms. Ferradaz’s responsibilities included client coordination, project scheduling and budget, and QA/QC project deliverables. Central District Wastewater Treatment Plant Stormwater Pumping System Evaluation, Miami-Dade Water & Sewer Department, FL. As part of the Storm Water Master Plan Update to support the submittal of the modified CDWWTP Environmental Resource Permit, Nova performed modeling of the existing stormwater system. Project tasks consisted of modeling; a field and desktop survey to determine the system’s capacity based on available information, such as, storm drainage areas, pump types, wet well dimensions, inlet elevations and pump station configurations. As Project Manager, Ms. Ferradaz’s responsibilities included client coordination, project scheduling and budget, and QA/QC project deliverables. Metrorail Central Control Upgrade, Miami-Dade Transit, FL. This project involves modernizing Miami Dade Transit’s existing Metrorail Control Center. As Project Controls Engineer, Ms. Ferradaz provided base line schedule review - reviewing contractor design documents (drawings, specs, etc.) and construction documents (RFI, CO, pay applications). Palmetto Station - Traction Power Sub-Station, Miami Dade Transit, FL. The project involves the design, construction and installation of a new Traction Power Substation at the existing Palmetto Station. As Scheduler, Ms. Ferradaz provided baseline schedule review and claims management services. North Corridor Metrorail Extension, Miami-Dade Transit, FL. This project consisted of a 9.5 mile elevated, double track rail extension of the Miami-Dade Metrorail system. Nova’s responsibilities in the design effort included as-built information for existing utilities; identifying and resolving utility conflicts and incorporating future plans for improvements and their potential impact to the proposed Metrorail plans; preliminary drainage and utility design for the guide way and associated facilities, including storm water and canal flow modeling. As Deputy Project Manager, Ms. Ferradaz’s responsibilities included utility coordination and relocation design, cost estimating, and project management tasks. Perimeter Road Canal Relocation & Utility Modifications at Miami International Airport, Miami-Dade Aviation Department, FL. This project included master planning, design, permitting, and construction for utilities and 800 feet of canal relocation; 2700 feet of new 24” water line, 8”sanitary force main relocations, and 1700 feet of new 16” force mains. As Scheduler/Claim Analyst, Ms. Ferradaz provided schedule analysis and claims support. As Scheduler/Claim Analyst, Ms. Ferradaz provided schedule analysis and claims support. Fire Hydrant Flow Testing at Miami International Airport, Miami-Dade Aviation Department, FL. This project involved testing the fire flow capacity of the water distribution system at the airport’s fuel farm. Nova was tasked with the performance of the flow testing, reporting, and providing recommendations on improvements. Ms. Ferradaz served as Sr. Principal Engineer. Miami-International Airport Fuel Master Plan, Miami-Dade Aviation Department, FL. This project entailed engineering services to review and update the current fuel master plan for jet fuel and gasoline / diesel supply and distribution systems, to meet the present and future fuel demands. Nova’s responsibilities included review of current and proposed environmental regulations to determine applicability to the present delivery system, proposed modifications, and future improvements to the airport. Ms. Ferradaz served as Sr. Project Engineer. Miami International Airport Central Chiller Plant Expansion Project, Miami Dade Aviation Department, FL. This project involved upgrading the existing open-drive centrifugal chillers and cooling towers. As Scheduler/Claims Analyst, Ms. Ferradaz provided schedule analysis and claims support. Miami International Airport South Terminal Expansion Program, Miami Dade Aviation Department, FL. The expansion of the South Terminal included the addition of over 1 million square footages of terminal and concourse space, 17 domestic/international swing gates, and a new customs and international passenger processing area. As Cost Engineer, Ms. Ferradaz’s responsibility included budget planning, tracking, and forecasting for this $800+ million project. ResumesNova Consulting, Inc. 70 ResumesNova Consulting, Inc. 1 Luis Dantes Construction Field Representative Mr. Dantes has over 30 years of experience in the fields of construction engineering and inspection for municipal environmental and infrastructure projects. These projects have included civil works, water lines, earthwork, drainage, buildings, and stake works. He has been responsible for construction inspection, on-site coordination, site investigations, scheduling, review of site plans and specifications, and overall construction. Relevant Experience Pump Station Improvement Program, Miami-Dade Water & Sewer Department, FL. Under the terms of the consent decree, Miami-Dade Water and Sewer Department (MDWASD) launched the PSIP an estimated $215M program including 153 upgrade/refurbish projects (118 sewage pump stations and 35 Force Mains) for compliance with the NAPOT of less than 10hrs as well as requirements for rain dependent peak flows. Nova is Program Manager responsible for project prioritization and preliminary evaluation, design flow criteria including I/I reduction, upgrade plan, equipment selection, coordination with utilities including FPL, design management and review, scheduling and cost estimating, value engineering and constructability review, and construction management and inspection including health and safety and public/stakeholder outreach. The PSIP has won several awards, met all EPA deadlines avoiding penalties and saved ~$37M (~17%) through implementation of value engineering ideas. Mr. Dantes served as Field Construction Engineer and document control assistant responsible for daily construction inspection, maintaining shop drawings and RFI logs, distribution of submittals for designer’s review and coordination between designer and contractor for resolution of construction related issues. Attended meetings and developed minutes for meetings. Provided documentation for claims. C-44 System Discharge & Stormwater Treatment Areas, South Florida Water Management District, FL. The C-44 Reservoir/STA project is a component of the Indian River Lagoon-South (IRL-South) Project under the Comprehensive Everglades Restoration Plan. The C-44 project consists of a reservoir and stormwater treatment areas (STAs) located on an approximately 12,000 acre site. Mr. Dantes serves as Construction Field Representative responsible for on-site observations, preparation of daily reports. South Miami Heights Site Improvement, Miami-Dade Water and Sewer Department, FL. The Miami-Dade Water and Sewer Department (WASD) requested engineering services in connection with the relocation of the Division staff from their existing offices at the South District Wastewater Treatment Plant (SDWWTP) to a new trailer complex to be located at the South Miami Heights Water Treatment Plant (SMHWTP) site. This project involves providing engineering design services related to general civil, drainage, electrical site lighting, parking, site striping and overall site plan. As Field Engineer, Mr. Dantes was responsible for conducting field observations. 42” Water Transmission Main, Downtown Miami-Dade, County, FL. This project involves the design of a 42” water transmission main between the intersection of Biscayne Blvd. and NW 5th Street and PortMiami. Nova was tasked to provide traffic control and/or MOT plans in accordance with FDOT and Municipalities and deliver 100 % design of utility relocations and Venturi flow meter station, piping, structural and details, as well as review and approval of up to 15 Shop Drawings, review of any change order requests and as-Built Certification. Nova is currently working on the Construction Engineering and Inspection of this project, responsible for Education BS, Civil Engineering, Pedro Henríquez Ureña National University Santo Domingo. Dominican Republic 1986 Credentials | Registrations ACI Concrete Field-Testing Technician, Grade 1 CTQP, Earthwork, Level I & II CTQP, Asphalt Paving, Level I & II FDOT TTC Intermediate (MOT) Hazardous Waste Operations and Emergency Response Troxler Nuclear Gauge Safety OSHA 40-Hr. HAZWOPER Expertise Construction Engineering & Inspection Project Management 71 Luis Dantes │ Construction Field Representative 2 oversight of construction activities on MDWASD's behalf and daily reporting of construction activities. Mr. Dantes was Construction Field Representative. PortMiami Cruise Terminal A Environmental Mitigation Project. Miami-Dade County Seaport Department, FL. As a result of the construction of the new Cruise Terminal A, there was an environmental requirement to transplant existing coral to an artificial reef offshore in front of South Beach. The project consisted of the fabrication of 120 gabions filled with rocks and installed at the deployment area offshore north of the port entrance channel in front of South Beach. The coral was then transplanted from the boulders protecting the shoreline to the top of the gabions to develop and artificial reef. A second phase consisted of moving the corals to the final offshore location. As Field Representative, Mr. Dantes conducted field observations of the second phase. IT Facility Replacement Project, South Florida Water Management District, Miami, FL. As part of the Operations and Maintenance Capital Program, the IT Facility Replacement Project - Miami, located in Miami-Dade County, consists of replacing the existing communications equipment facility, installing new communications support equipment, installing a new electrical grounding grid and installing new communications cabling at the Miami Field Station and Miami South Tower sites. Replacement of the existing facility will allow for continued service by the microwave tower, which serves as part of the backbone telemetry system of the flood control system. As Field Engineer, Mr. Dantes observes and documents the construction and assists the DPM (District Project Manager) and Chen Li with LH Engineering in determining if the work is performed according to the associated Project drawings and specifications. He attends and participates at project construction meetings as requested to update the District on the status of the construction, which includes but is not limited to construction activities accomplished to date, potential and/or actual construction problems and delays, and upcoming work to be completed by the construction Contractor and the Consultant. He assists in the review and response, as specified by the DPM, to shop drawing submittals, Requests for Information (RFls), Requests for Clarifications (RFCs), Requests for Proposals (RFPs), Change Orders (CO), Field Orders (FO) and Value Engineering (VE) proposals and submittals, as necessary; assist the DPM with the review and reconciliation of Contractor payment applications; and assist with the verification of project completion milestones and contract closeout/commissioning. BCWWS Master Pump Stations 224 and 226 Improvements, Broward County, FL. This project consists of the rehabilitation of Master Pump Stations 224 and 226. Repairs involved well rehabilitation, replacement of piping, pumps, panels, electrical valves, and hatches. Nova was responsible for all phases of the planning, design and construction for these two large master pump station projects, including flow analysis and determination of peak flows considering I/I and RDII, engineering reports and BODR including equipment selection, process mechanical design, structural rehabilitation, MOT, and permitting with the Florida Department of Environmental Protection and Broward County Environmental Protection Department. Mr. Dantes was Field Engineer. * Public Works Department in Santo Domingo, Dominican Republic. Mr. Dantes was Supervisor for the Department and Structural Inspector. * Invi la Virgen and Paraiso Canaan (Villa Mella). Santo Domingo, Dominican Republic. Project Manager for the construction of water distribution projects. * Private Industry, General Contractor, Dominican Republic. Field Project Engineer responsible for Civil and Structural Construction Supervision of building and housing projects. * Constructora Jordaca, Santo Domingo, Dominican Republic. Civil Engineer/Senior Project Manager for the construction of a cancer hospital. *Prior to joining Nova ResumesNova Consulting, Inc. 72 ResumesNova Consulting, Inc. 1 Valeska Colmenares Staff Engineer Ms. Colmenares has over 9 years of experience developing and simplifying office and field procedures, assisting in preparation of project budgets, and finding innovative solutions for document control and data management. Ms. Colmenares’ background also includes construction field inspection and office engineering. Relevant Experience Pump Station Improvement Program, Miami-Dade Water & Sewer Department, FL. Under the terms of the consent decree, MDWASD launched the PSIP an estimated $215M program including 153 upgrade/refurbish projects (118 sewage pump stations and 35 Force Mains) for compliance with the NAPOT of less than 10hrs as well as requirements for rain dependent peak flows. Nova is Program Manager responsible for project prioritization and preliminary evaluation, design flow criteria including I/I reduction, upgrade plan, equipment selection, coordination with utilities including FPL, design management and review, scheduling and cost estimating, value engineering and constructability review, and construction management and inspection including health and safety and public/stakeholder outreach. The PSIP has won several awards, met all EPA deadlines avoiding penalties and saved ~$37M (~17%) through implementation of value engineering ideas. As Document Control Engineer, Ms. Colmenares ensured that all document transmittals were accurate and completed in a timely manner. Ms. Colmenares was also responsible for organizing the master database. Additionally, she updated construction books and plans as the projects were completed. She assisted the Construction Manager by sending letters, submittals and additional documents to Contractors and EOR. Ms. Colmenares also managed the distribution of all technical data and handled the flow of project files, submittals and receivables. C-44 Reservoir/STA, Comprehensive Everglades Restoration Plan, South Florida Water Management District, FL. The C-44 Reservoir/STA project is a component of the Indian River Lagoon-South (IRL-South) Project under the Comprehensive Everglades Restoration Plan. The C-44 project consists of a reservoir and stormwater treatment areas (STAs) located on an approximately 12,000 acre site. Ms. Colmenares was Staff Engineer. City of Fort Lauderdale, Wastewater Collection and Transmission: Planning and Construction Inspection, Fort Lauderdale, FL. Nova worked on the development, maintenance, update and calibration of the InfoWater Wastewater Transmission System model, as well as the InfoSWMM gravity sewer model. The force main and gravity models were used to perform Capacity Evaluation of the system and identify any improvements required over the next 10 years (2018-2028). Nova also provided construction inspection services of field activities including bypass pumping set-up, liner installation, liner curing, lateral reinstatement, cleanout installation, and manhole repairs in the A-7, A-18, A-19 A-21 D-40 and D-43 sewer areas. Ms. Colmenares was Field Technician. Design Services for Gravity Sewer, Miami-Dade Water & Sewer Department, Miami, FL. Nova assisted MDWASD with the professional engineering services in connection with the design, permitting, regulatory/utility coordination, bid phase services and engineering services during construction for the proposed new gravity mains associated with sub-basin D2-A-1. The scope of this project included a plan to extend sewer services to commercial and industrial parcels within the County's Commission Districts. Ms. Colmenares was Staff Engineer. Hydraulic Engineering Modeling Services, Miami-Dade Water & Sewer Department, Miami, FL. This project involves hydraulic engineering modeling services that will assist WASD Master Planning Section Staff to analyze the Wastewater Collection and Education Business Management Hocking Technical College, Nelsonville, OH 2000 to 2001 BS Mechanical Engineering Universidad Tecnológica del Centro, Venezuela, 1997 Credentials OSHA 40 Hour HAZWOPER Temporary Traffic Control (TTC) Intermediate Course Class A/B Operator Underground Storage Tank Expertise Field Inspection Project Administration Document Control Contract Management Cost Estimating 73 Valeska Colmenares │ Staff Engineer 2 Transmission System (WCTS) for capacity issues to meet the Consent Decree (CD) requirements. These analyses will be carried out using the countywide hydraulic model, among other tools. Nova provided support for the ongoing System Capacity Assurance Program. Provide support for capital improvement program development related to hydraulic capacity improvements. Set up, modeling, and processing the results for the modeling alternative scenarios. Review results for the alternative scenarios wit h WASD Planning Department project manager and define if additional analyses are required. Provide other wastewater modeling services as needed (i.e. new connections or service areas, basin updates, flows, pressures, pipe sizing, pump sizing, flow management). Ms. Colmenares was Staff Engineer. West Cargo Fuel Tender Facility Relocation Project, Miami-Dade Aviation Department, FL. This project includes the relocation of a new West Cargo Fuel Tender Facility for Miami International Airport (MIA). Nova was tasked with professional engineering services to assess existing civil conditions and provide engineering design to accommodate the new facility, as well as develop specifications and a cost estimate for the design, assist in permitting, and provide bid & award and work related services. Ms. Colmenares was Staff Engineer. PortMiami Cruise Terminal A Environmental Mitigation Project, Miami-Dade County Seaport Department, Miami, FL. As a result of the construction of the new Cruise Terminal A, there was an environmental requirement to transplant existing coral to an artificial reef offshore in front of South Beach. The project consisted of the fabrication of 120 gabions filled with rocks and installed at the deployment area offshore north of the port entrance channel in front of South Beach. The coral was then transplanted from the boulders protecting the shoreline to the top of the gabions to develop and artificial reef. A second phase consisted of moving the corals to the final offshore location. Ms. Colmenares was Staff Engineer. Fat Oil and Grease (FOG) Facility, Miami-Dade Water and Sewer Department, Miami, FL. Nova assisted in the BODR of a new dedicated fats, oils, and grease (FOG) receiving and handling facility at the SDWWTP. The existing Septage and FOG Management Facility at the SDWWTP receives combined FOG and septage from waste haulers and operation of the facility is labor intensive. The layout of the facility is not conducive to efficient handling and separation of FOG materials. A dedicated FOG receiving, storage, and feed facility is expected to significantly improve the FOG material handling at the SDWWTP and reduce the labor required to keep the existing facility operating smoothly. Ms. Colmenares was Office Engineer. City of Fort Lauderdale, Wastewater Collection and Transmission: Planning and Construction Inspection, Fort Lauderdale, FL. Nova worked on the development, maintenance, update and calibration of the InfoWater Wastewater Transmission System model, as well as the InfoSWMM gravity sewer model. The force main and gravity models were used to perform Capacity Evaluation of the system and identify any improvements required over the next 10 years (2018-2028). Nova also provided construction inspection services of field activities including bypass pumping set-up, liner installation, liner curing, lateral reinstatement, cleanout installation, and manhole repairs in the A-7, A-18, A-19 A-21 D-40 and D-43 sewer areas. As field inspector, Ms. Colmenares checked status, measurements and conditions of 1,000 manholes in the City of Fort Lauderdale. MIA Taxiway R, S and T Pavement Rehabilitation, Miami-Dade Aviation Department (MDAD), FL. The project consisted of value analysis and life cycle costing for airfield improvements to Miami International Airport Taxiways R, S and T including pavement rehabilitation, runway extension and realignment, taxiway reconfiguration, construction of improved fuel tender parking area, jet fueling facility and other features. This rehabilitation needed to meet FAA requirements for AIP funding as well as Miami Dade Aviation Department standards. Nova’s effort was focused on reducing construction time while not impacting airport operations. The ori ginal design for the truck parking lot has drainage structures that are rated for aviation loading and Nova focused on replacing some of these with equivalent structures rated for landside or truck operations. The length of the canal was examined, and its drainage function was evaluated to reduce the excavation required without negative impact to its function. Nova also evaluated the handling of potentially contaminated soils to attempt to save time and money by reducing the temporary stockpiling required. As Task Manager, Ms. Colmenares oversaw the preparation of the cost estimate and value engineering report that produced four proposed design alternatives and four design suggestions. ResumesNova Consulting, Inc. 74 ResumesHammond & Associates, Inc. EDUCATION: Bachelor of Science, Mechanical Engineering, University of the West Indies, 1973 Diploma, Electrical Engineering, University of Technology, 1967 REGISTRATION/LICENSES: Florida Professional Engineer PE39008 AFFILIATION: National Fire Protection Association YEARS OF EXPERIENCE: 45 Mr. Eric J. Hammond, PE is a Professional Engineer with over 45 years of experience in Mechanical,Plumbing and Fire Protection design and Construction, Management. Mr. Hammond is the Principal-in-Charge overseeing all technical and administrative policies and management of the rm. He has facilitated many new and existing municipal projects, to include public safety and transportation, judicial buildings, re stations, parking garages, emergency operations, community enters, senior centers, recreational centers, parks, and renovation and remodeling of building facilities. He makes ethical and cost eff icient decisions that result in exceptional client satisfaction. He attends meetings during the design phase and remains active in all projects throughout completion. He performs necessary code research within his discipline and collaborates with the Architect and project Owner. ERIC J. HAMMOND, PE PRINCIPAL/MECHANICAL ENGINEER BROWARD COUNTY COURTHOUSE, Broward County, FL – Hammond & Associates provided Mechanical, Electrical, Plumbing Engineering services for the new courthouse complex includes a county off ice building, the county jail, three courthouse buildings, an energy center, and a parking garage. The 740,000-square foot court building, which will occupy a 1.55-acre portion of the campus, is 20-stories high and features 74 courtrooms and hearing rooms, as well as off ice space for several government agencies. The courthouse will feature state-of-the-art technology, including extensive audio-visual and evidence presentation systems for the courtrooms and off ice spaces. Security will be enhanced using CCTV, card access, duress devices (push buttons) and entry screening security systems. Achieving a LEED Gold certi cation, the courthouse includes energy reductions up to 22 percent and water-use savings up to 30 percent. Role: Principal-in-Charge, Mechanical Engineer CITY OF MIRAMAR POLICE DEPARTMENT,City of Miramar, FL– This facility is a three-story wrap around structure surrounding the Town Center Parking Garage. The rst level of this 80,000 SF building consists of a pedestrian friendly retail area with an arch covered exterior sidewalk facing City Hall Promenade and the pedestrian/automobile entrance to the building. The second and third oor houses the City’s Police Department including a sally port entry, holding areas, off ices, conference rooms and investigative facilities. This secure building is designed to be bullet-proof inside and outside and withstand Category 5 hurricanes. Hammond & Associates provided Plumbing and Fire Protection for the project. Role: Principal | Mechanical Engineer BROWARD COUNTY JAIL, FT. LAUDERDALE, FL – Hammond & Associates provided engineering designs for the replacement of 4 chilled water air handlers. Each unit was approximately 180 tons with a total of 34, 650 CFM supply air and 16,000 CFM outside air. These were the original units to the buildings and were located in 2 separate mechanical rooms on the 4th oor of the facility. The inlet vanes were removed and the units were retro tted with Variable Frequency Drives (VFD’s). Role: Principal-in-Charge, Mechanical Engineer FORT LAUDERDALE FIRE STATION NO. 54, Broward County, FL – This 10,000 SF facility includes a two-bay apparatus room for a ladder and rescue trucks, a medical exam/watch off ice, two business off ices, equipment bunker storage, medical storage, decontamination room and a multi-purpose room for department or community use complete with restroom facilities. The site also includes a training tower for live drills. Living amenities within the two-story building include private dormitory facilities, full-service kitchen with commercial range and hood, dining facility, day room with reclining theater seats, covered exterior patio, laundry, and tness facility. Sustainable building design and construction practices were planned into the building and site design to attain Florida Green Building Coalition Certi cation. RELEVANT PROJECT EXPERIENCE 150 NW 70TH AVENUE, SUITE 10, PLANTATION, FL 33317 954.327.7111 www.hammondengineers.com 75 EDUCATION: BS Electrical Engineering Florida International University (FIU) 2006 REGISTRATION: LEED AP AFFILIATIONS: National Fire Protection Association (NFPA) YEARS OF EXPERIENCE 13 Stephen Farquharson is an Electrical Engineer with over 13 years of Electrical Engineering Design and Construction Administration experience. He has served as lead Electrical engineer on many of Hammond & Associates renovation projects. His expertise includes design of UPS, re alarm, lightning protection, lighting and power systems. He is very knowledgeable in the requirements and speci cations of back-up generators. He has the expertise in managing complex projects requiring LEED design including several LEED Silver projects. He works in close collaboration with project owners and architects to create a lighting design that meets the needs of both the Owner and the User. STEPHEN FARQUHARSON, LEED, AP ENGINEERING MANAGER ELECTRICAL ENGINEER RELEVANT PROJECT EXPERIENCE CITY OF MIRAMAR POLICE DEPARTMENT, City of Miramar, FL This facility is a three-story wrap around structure surrounding the Town Center Parking Garage. The rst level of this 80,000 SF building consists of a pedestrian friendly retail area with an arch covered exterior sidewalk facing City Hall Promenade and the pedestrian/automobile entrance to the building. The second and third oor houses the City’s Police Department including a sally port entry, holding areas, off ices, conference rooms and investigative facilities. This secure building is designed to be bullet-proof inside and outside and withstand Category 5 hurricanes. BROWARD COUNTY COURTHOUSE, Broward County, FL– Hammond & Associates provided Mechanical, Electrical, Plumbing Engineering services for the new courthouse complex including a county off ice building, the county jail, three courthouse buildings, an energy center, and a parking garage. The 740,000-square foot court building, which will occupy a 1.55-acre portion of the campus, is 20-stories high and features 74 courtrooms and hearing rooms, as well as off ice space for several government agencies. The courthouse will feature state-of-the-art technology, including extensive audio-visual and evidence presentation systems for the courtrooms and off ice spaces. Security will be enhanced using CCTV, card access, duress devices (push buttons) and entry screening security systems. Achieving a LEED Gold certi cation, the courthouse includes energy reductions up to 22 percent and water-use savings up to 30 percent. Role: Electrical Engineer. FORT LAUDERDALE, FIRE STATION NO. 54, Fort Lauderdale, FL – 10,000-square- foot facility include a two-bay apparatus room for a ladder and rescue trucks, a medical exam/watch off ice, two business off ices, equipment bunker storage, medical storage, decontamination room and a multi-purpose room for department or community use complete with restroom facilities. The site also includes a training tower for live drills. Living amenities within the two-story building include private dormitory facilities, full-service kitchen with commercial range and hood, dining facility, day room with reclining theater seats, covered exterior patio, laundry, and tness facility. Sustainable building design and construction practices were planed into the building and site design to attain Florida Green Building Coalition Certi cation. Hammond & Associates provided Mechanical, Electrical, Plumbing and Fire Protection engineering design services as well as Construction Administration. Role: Lead Electrical Engineer and Construction Administration for the project. HELEN MILLER COMMUNITY CENTER, OPA LOCKA, FL – Demolished the existing 1-story building and designed and constructed a new 2-story energy eff icient building of approximately 6,000 square feet at the same location. The building is a multi-purpose facility with the following amenities: community hall, restroom, kitchen facility, off ices, operation rooms, and storage room. Design services were delivered in compliance with local, state and federal regulations. The facility provides a public facility and infrastructure improvements bene t, which serves the Opa-Locka Neighborhood Revitalization Strategy Area in the City of Opa-Locka. Provided Mechanical, Electrical, Plumbing and Fire Protection engineering services for the facility. The facility also serves as a hurricane shelter while complying with the City’s need. Construction Cost $ 3.8 Million. Role: Electrical Engineer 150 NW 70TH AVENUE, SUITE 10, PLANTATION, FL 33317 954.327.7111 www.hammondengineers.com ResumesHammond & Associates, Inc. 76 EDUCATION: B.S. Electrical Engineering, 1966 University of the West Indies, St. Augustine, Trinidad State Certi ed Electrical Contractor, EC130006036 REGISTRATION/LICENSES: Professional Engineer PE# 51151 (Florida) 1987 AFFILIATION: National Society of Fire Protection (NFPA) YEARS WITH THE FIRM: 15 DONALD DIXON, PE ELECTRICAL ENGINEER BROWARD COUNTY JAIL, Ft. Lauderdale, FL – Provided engineering designs for the replacement of 4 chilled water air handlers. Each unit was approximately 180 tons with a total of 34, 650 CFM supply air and 16,000 CFM outside air. These were the original units to the buildings and were located in 2 separate mechanical rooms on the 4th oor of the facility. The inlet vanes were removed and the units were retro tted with Variable Frequency Drives (VFD’s). Role: Electrical Engineer CITY OF MIRAMAR POLICE DEPARTMENT,City of Miramar, FL– This facility is a three-story wrap around structure surrounding the Town Center Parking Garage. The rst level of this 80,000 SF building consists of a pedestrian friendly retail area with an arch covered exterior sidewalk facing City Hall Promenade and the pedestrian/ automobile entrance to the building. The second and third oor houses the City’s Police Department including a sally port entry, holding areas, off ices, conference rooms and investigative facilities. This secure building is designed to be bullet-proof inside and outside and withstand Category 5 hurricanes. Hammond & Associates provided Plumbing and Fire Protection for the project. Role: Electrical Engineer BROWARD COUNTY COURTHOUSE, Broward County, FL – Hammond & Associates provided Mechanical, Electrical, Plumbing Engineering services for the new courthouse complex includes a county off ice building, the county jail, three courthouse buildings, an energy center, and a parking garage. The 740,000-square foot court building, which will occupy a 1.55-acre portion of the campus, is 20-stories high and features 74 courtrooms and hearing rooms, as well as off ice space for several government agencies. The courthouse will feature state-of-the-art technology, including extensive audio-visual and evidence presentation systems for the courtrooms and off ice spaces. Security will be enhanced using CCTV, card access, duress devices (push buttons) and entry screening security systems. Achieving a LEED Gold certi cation, the courthouse includes energy reductions up to 22 percent and water-use savings up to 30 percent. Role: Electrical Engineer LAUDERHILL SPORT PARK,Lauderhill Lakes, FL ȃ This community park is constructed on a 26 acre property. The recreational facility has lighted basketball courts, baseball eld, cricket and soccer elds. The design elements include complete air conditioning services, sanitary and water piping systems for the building and the roof drains, as well as outdoor lighting and site lighting. Hammond & Associates also provided construction administration services for the project. Role: Electrical Engineer HELEN MILLER COMMUNITY CENTER, OPA LOCKA, FL – Demolished the existing 1-story building and designed and constructed a new 2-story energy eff icient building of approximately 6,000 square feet at the same location. The building is a multi- purpose facility with the following amenities: community hall, restroom, kitchen facility, off ices, operation rooms, and storage room. Design services were delivered in compliance with local, state and federal regulations. The facility provides a public facility and infrastructure improvements bene t, which serves the Opa-Locka Neighborhood Revitalization Strategy Area in the City of Opa-Locka. Provided Mechanical, Electrical, Plumbing and Fire Protection engineering services for the facility. The facility also serves as a hurricane shelter while complying with the City’s need. Construction Cost $ 3.8 Million. Role: Electrical Engineer Mr. Dixon is a Registered Professional Engineer with over 15 years of experience in electrical engineering design, installations and construction management services. Mr. Dixon serves as the Project Engineer and electrical Engineer-of-Record for many of Hammond & Associates municipal and county projects. His expertise is in the design of power distribution systems and value engineering. He has the expertise to manage complex projects and works in close collaboration with project owners and architects to create a lighting design that meets the needs of both the Owner and the User. RELEVANT PROJECT EXPERIENCE 150 NW 70TH AVENUE, SUITE 10, PLANTATION, FL 33317 954.327.7111 www.hammondengineers.com ResumesHammond & Associates, Inc. 77 ResumesPremiere Design Solutions, Inc. GUSTAVO ECKARDT, P.E. Surveying Project Manager EDUCATION B.S. in Civil Engineering, University of North Carolina, 2002 Scheduling Seminar - Primavera Project Management, Miami Micro Data, 2005 Designing Pedestrian Facilities for Accessibility / ADA Seminar 2008. Work Zone Traffic Control & Maintenance of Traffic, FES Seminar, 2010 (BT-05-0079) PROFESSIONAL REGISTRATIONS • P.E. Florida License No. 67553 PROFESSIONAL AFFILIATIONS • Chi Epsilon Civil Engineering Honor Society - Member • FES (Florida Engineering Society - Member) FIELD OF SPECIALIZATION Topographic Surveys Water & Sewer Utilities Transportation Transit Facilities ADA Compliance Storm Water Management General Civil Engineering Permitting Bid Preparation & Assistance Construction Management Utility Coordination Utility Surveys YEARS OF EXPEREINCE 18 Years EXPERIENCE SUMMARY Mr. Eckardt is a professional engineer registered in the states of Florida with over 18 years of experience in Civil Engineering, land development, topographic surveys and roadway design. Mr. Eckardt currently serves as Director of Engineering for Premiere Design Solutions, Inc. (PDS) responsible for overseeing surveying and engineering project production, quality control and making sure our Clients needs are incorporated into our engineering design. Mr. Eckardt has been a project manager for professional engineering and surveying services work assigned to PDS. Mr. Eckardt’s experience in the public sector includes design for new and existing infrastructure utilities in different municipalities throughout South East Florida. For these types of projects Mr. Eckardt has designed roadway improvements projects for Miami-Dade Public Works, Miami-Dade Transit, Broward County Transit, Mr. Eckardt has also designed potable water and sanitary sewer collection systems for the Miami-Dade Water and Sewer Department. He has a vast experience in utility coordination, subsurface utility investigation and GIS projects. RELEVANT EXPERIENCE Citywide CIP Water & Sewer Improvement Surveys, City of Opa-Locka, FL This project includes the topographic route surveys for over 200,000 LF of ROW surveys on roadways to receive water and sewer improvements as part of the Capital Improvements Program (CIP) throughout the City of Opa-Locka. PDS is part of the Team to provide design criteria packages for the letting of this work. Mr. Eckardt is the Project Manager responsible for the plans production, scheduling and project activity coordination with the Client and field crews for this aggressive execution schedule project. Cairo Ln Topographic Survey, City of Opa-Locka, FL - This project was an emergency project to conduct a topographic survey of 2,600LF of roadway in the City of Opa-Locka. Project included the collection of all above ground features, spot elevations, underground utility investigation, recording of existing roadway conditions, and depiction of right-or-ways along this corridor. Mr. Eckardt was the project manager responsible for client coordination and scheduling of field work and drawing generation and conducted quality assurance and quality control on the project deliverables and data collection. Sketches and Legal Descriptions for 11 properties, City of Opa-Locka, FL - This project was a support service to the City of Opa-Locka in the development of legal easement documentation for future roadway improvements planned within the City. The project consists of the drafting of legal descriptions and sketches for easements currently in negotiation between the City and property owners. Project Included one document with legal description and sketch for each of the 11 properties included in the project. The legal descriptions and sketches provided will be utilized by the City and will be included in their preparation of documents and negotiation of easements. As project manager, Mr. Eckardt was responsible for client coordination and scheduling plat investigations, field work and drawing generation and conducted quality assurance and quality control on the project final deliverables. Pump Station 11C Upgrades, Opa-Locka, Florida Mr. Eckardt was the project manager and engineer of record for this project to provide upgrades to the master lift station in the City of Opa-Locka responsible for collection all sanitary sewer flows in the city and routing them to the receiving County pump station via a 12” force main. Project included the structural building renovations, completely new electrical system, pump controls, telemetry, replacement of the three main 140 HP VFD pumps rated at 3,200 GPM and the design of a standby emergency diesel operated pump with integrated generator. Permitting services through the City and RER, FPL Coordination and construction support were also provided. 78 GUSTAVO ECKARDT, P.E. Surveying Project Manager Various Roadway Intersections Surveys, Miami-Dade County, FL - This project was to provide roadway intersection improvements at five different roadway intersections throughout Miami-Dade County. Mr. Eckardt was tasked with managing the topographic surveys which required the completion of five separated Specific Purpose Surveys with a very aggressive schedule. Each location included all visible relevant topographic features along the proposed site area, Right-Of-Way research and preparation, plat research and the submittal drawing was required to follow standards provided by the Client. Mr. Eckardt provided project coordination between client and survey crew, and ensured all production was geared towards this project, with adequate staff levels, and deliver in a timely manner to meet the aggressive schedule required in this project. Mr. Eckardt also conducted QA/QC reviews on deliverables on this project. Medley Fire rescue Facility Survey, Medley, Miami-Dade County, FL - This project was to replace the perimeter fence after the existing fence was damaged by recent storm events. The project site was an existing and Active Fire rescue Facility, of about 6.4 Acres, owned and maintained by Miami-Dade County. A specific purpose survey was conducted by Mr. Eckardt was the project manager on this project and coordinated between survey crew, user department and client. Mr. Eckardt also conducted QA/QC reviews on deliverables on this project. South Bulkhead Repairs Bay 165 - 177, PortMiami, Miami, FL - The Work of this Project comprised the general construction necessary to repair a portion of the bulkhead walls in the area of South bulkhead from Bays 165-177, including the installation of king piles, concrete cap, marine fenders, water stations and mooring bollards. Mr. Eckardt was responsible for the Topographic Survey, Civil Engineering, Utility Coordination, and Construction support required for this Project. Activities performed included Survey, Drainage Design, Drainage Calculations, utility investigation, water main and water station design, permitting Support, Bid Support and Engineering During Construction Services. Miami-Dade Water and Sewer Utility Atlas Update and GIS Implementation Miami Springs, FL - Mr. Eckardt was the Project Manager for this Miami-Dade Water and Sewer Department (WASD) project to provide support services for implementation of the Department’s GIS system for water and sewer infrastructure, with the priority of Miami Springs acquired utilities. The main objective of this project was to compile all As-Built Information related to all water and sewer assets of Miami Springs, an area of 1,900 Acres, and upload the information digitally into the WASD GIS System. Mr. Eckardt directed a six full time GIS Specialists team working at WASD entering water and sewer utility information and provides monthly updates to WASD management staff. Project included field data collection and as-built research to collect information necessary for the input of water & sewer infrastructure. North Perry Airport Park and Ride Facility, Pembroke Pines, FL - Mr. Eckardt served as Senior Project Engineer for the development of a Park and Ride Facility at the North Perry Airport located on the northeast corner of Pembroke Road and University Drive in the City of Pembroke Pines. The site development included the surveying and design of the parking facility including a drainage and lighting system to serve riders of the Broward County Transit System, and new parking lot. Mr. Eckardt was responsible for the coordination and reviews of surveying services, design, permitting with the local governmental agencies and overseeing construction of this facility for Broward County Transit and the City of Pembroke Pines. ADA Compliant Bus Stop Improvement, Town of Miami Lakes, Miami Lakes, FL - Mr. Eckardt was the project manager and engineer of record for this project, which included the filed data collection, topographic survey, scope determination, and the generation of demolition, new construction, and maintenance of traffic plans. Project provided the client with the design for ADA improvements to 19 bus stops locations, new bus shelters, concrete pads, sidewalks and amenities and coordination with Town, Miami-Dade Transit, utility investigations & permitting. Biscayne Landing Engineering and Surveying Support, North Miami, FL - Mr. Eckardt was the Project Manager in this project to provide the determination of volume of crushed concrete material stockpiled at the Biscayne Landings construction site and volume of lakes to be filled over an abandoned Landfill. Mr. Eckardt coordinated activities between the owner, Developer and field survey crews to obtain field data of the location and elevation of the stockpiled material and lake soundings. With the information of the field data, utilizing cross 25’ sections, information was migrated into AutoCAD Civil 3D to generate a Digital Terrain Model (DTM), generating surfaces for the existing ground and for the surface area of each of the five stock pile mounds located at the construction site. DTM was used to determine volume between the two surfaces, to generate cross sections of the stock piles at constant intervals. Mr. Eckardt performed calculation reviews and signed and sealed volume reports. ResumesPremiere Design Solutions, Inc. 79 ResumesPremiere Design Solutions, Inc. FERNANDO FERNANDEZ, PSM Surveying Lead EDUCATION • Hydrologist Engineer Alma- Ata, former USSR, 1987 FIELD OF SPECIALIZATION • Field Data Collection • Autocad / Land Desktop • Total Station and Data Collector Knowledge • Topographic Surveys • Roadway Surveys • Certificate of Elevations • GPS Field Location • Surveys with NAVD88 and NGVD29 • As-Built Certified Surveys for Water and Sewer projects • Project Stakeout • Writing and interpretations of legal descriptions • Plat Research • Legal Description Drafting CERTIFICATIONS • Professional Land Surveyor and Mapper • State of Florida, LS 6765 YEARS OF EXPEREINCE 20 Years EXPERIENCE SUMMARY Mr. Fernandez has nearly twenty years of field data verification, collection and surveying experience. Mr. Fernandez is a professional proficient in the use of different kinds of Data Collectors, Total Station and other surveying equipment, and is familiar with the process to develop Topographic Surveys and As-Built Drawings Miami-Dade County and Broward County, conducting surveys of above ground features and utility verifications, roadway surveys, construction stake-out and utility project as-builts. Mr. Fernandez is a diligent worker with knowledge of Autocad and various tools of the trade, with the ability to manage multiple tasks, work on projects autonomously, and work as required to meet deadlines. Mr. Fernandez is a Florida Registered Land Surveyor with extensive experience in working in the City of Opa-Locka, having personally walked most of the City Streets, and is constantly participating personally on field data collection of all assignments under his control, qualifying him as a Surveyor with extensive field knowledge and experience. KEY EXPERIENCE Opa-Locka Citywide CIP Water & Sewer Improvement Surveys, City of Opa- Locka, FL This project includes the topographic route surveys for over 200,000 LF of roadway to receive water and sewer improvements as part of the Capital Improvements Program (CIP) throughout the City of Opa-Locka. PDS is part of the Team to provide design criteria packages for the letting of this work. Mr. Fernandez is the Lead Surveyor and is responsible for the production of survey drawings, collecting all ROW data, above ground features and elevations. Cairo Ln Topographic Survey, City of Opa-Locka, FL - This project was an emergency project to conduct a topographic survey of 2,600LF of roadway in the City of Opa-Locka. Project included the collection of all above ground features, spot elevations, recording of existing conditions, and depiction of right-or-ways along this corridor. Mr. Fernandez was responsible for field data collection and conducted reviews of CAD drawings prior to submittal. Sketches and Legal Descriptions for 11 properties, City of Opa-Locka, FL - This project was a support service to the City of Opa-Locka in the development of legal easement documentation for future roadway improvements planned within the City. The project consists of the drafting of legal descriptions and sketches for easements currently in negotiation between the City and property owners. Project Included one document with legal description and sketch for each of the 11 properties included in the project. The legal descriptions and sketches provided will be utilized by the City and will be included in their preparation of documents and negotiation of easements. Mr. Fernandez was the lead surveyor on this project generating plats and performing field data verification and site visits to generate legal sketches and descriptions. Various Roadway Intersections Surveys, Miami-Dade County, FL This project was to provide roadway intersection improvements at five different roadway intersections throughout Miami-Dade County. Mr. Fernandez was tasked with the topographic surveys which required the completion of five separated Specific Purpose Surveys with a very aggressive schedule. Each location included all visible relevant topographic features along the proposed site area, Right-Of-Way research and preparation, plat research and the submittal drawing was required to follow standards provided by the Client, including layers, line weights, colors, symbols, etc, as required by Miami-Dade County. Mr. Fernandez led the field crew in the data collection and was responsible for the generation of survey drawing deliverables. 80 FERNANDO FERNANDEZ, PSM Surveying Lead City Land Surveyor, City of Miami Gardens, Florida. The City of Miami Gardens engaged a Premiere Design Solutions as the City’s Consultant for Land Surveying Services. Mr. Fernandez has led this project for the past 5 years, and was recently selected again as the firm of choice of the City for Land Surveying Services. Under this project, Mr. Fernandez has completed ALTA surveys, Elevation Certificates, City Owned Property specific purpose surveys, Boundary surveys and Legal description and sketches. This is fast paced work, with quick turnaround required by the Client, and Mr. Fernandez always delivers on time. Mr. Fernandez leads his team of CAD drafters in the preparation of deliverables, and provides signed and sealed final documents. Medley Fire rescue Facility Survey, Medley, Miami-Dade County, FL - This project was to replace the perimeter fence after the existing fence was damaged by recent storm events. The project site was an existing and Active Fire rescue Facility, of about 6.4 Acres, owned and maintained by Miami-Dade County. A specific purpose survey was conducted by Mr. Fernandez which included all visible relevant topographic features along the proposed site boundary, physical boundary demarcations, legal description, marking property corners, existing property lines and recorded easements and plat information as available in readily available public information records. Mr. Fernandez led the field crew collecting data and developed topographic drawing deliverables. Topographic ROW Surveys for Design for 60-inch & 36 inch FM along SW137 Ave. As part of the Ocean Outfall Legislation program, M-DWASD is undertaking construction of several miles of large-diameter wastewater force mains to redirect wastewater effluent and eliminate ocean outfalls. This project included Field Investigation, Land Surveying under Mr. Fernandez lead, who was responsible for the field investigation and land surveying. Miami-Dade County Bus Stop Topographic Surveys, Miami-Dade County, FL - This project includes performing topographic surveys in the municipalities of Pinecrest, Town of Surfside, Bay Harbor Islands, and Miami Lakes. Surveys include the location of all above ground features, locate and translate benchmarks, generate elevations, easement and right-of-way determination for the addition of bus shelters at over 30 local roadway bus stops. Mr. Fernandez directs our crew to obtain field information and then reviews CAD drawings to be later provided to our engineering department for design purposes. South Bulkhead Repairs Bays 165-177, Port Miami, FL. This project includes the topographic route surveys for over 200,000 LF of ROW surveys on roadways to receive water and sewer improvements as part of the Capital Improvements Program (CIP) throughout the City of Opa-Locka. PDS is part of the Team to provide design criteria packages for the letting of this work. Mr. Fernandez is the Lead Surveyor and is responsible for the production of survey drawings, generation of plat drawings and location of property lines, easement and monument lines, collecting all ROW data, above ground features and elevations. Various Projects Within Miami -Dade County, FL - Mr. Fernandez worked as a Crew Chief performing almost all kind of surveying works in different projects as Riverside Subdivision and Beacon Lakes: boundary survey, topographic and hydrographic surveys, GPS locations, water and sewer stakeout, buildings stakeouts, final surveys. Worked in charge of other smaller projects performing Boundary, ALTA, Cadastral, Topographic, Subdivision, Hydrographic, Control, Construction Stakeout, and As-builts. Biscayne Landing Engineering and Surveying Support, North Miami, FL - Mr. Fernandez is the Survey Crew Party Chief in this project to provide development support to the Owner. Project included the determination of volume of crushed concrete material stockpiled at the Biscayne Landings construction site and volume of lakes to be filled. Mr. Fernandez coordinated survey crews to obtain horizontal and vertical data of the location and elevation of the stockpiled material and lake soundings. With the information of the points collected in the field utilizing cross sections no longer than 25’, information was migrated into AutoCAD Civil 3D to generate a Digital Terrain Model (DTM), generating surfaces for the existing ground and for the surface area of each of the five stock pile mounds located at the construction site. The DTM was used to determine the volume between the two surfaces, and to generate cross sections of the stock piles at constant intervals. NE 10th Street & NE 7th Avenue Roadway Improvements, Dania Beach, FL. Project consisted of extension of NE 10th Street to the east and reconstruction of NE 7th Avenue from this intersection to the north intersection with Taylor Road. Project proposed water and sewer improvements along this roadway corridor. Mr. Fernandez was responsible for the topographic survey of this roadway corridor, including construction stake-out and collection of as-built data and preparation of final as-built drawings for the project including as-built elevations and alignments. ResumesPremiere Design Solutions, Inc. 81 FERNANDO FERNANDEZ, PSM Surveying Lead Taylor Lane Roadway Improvements, Dania Beach, FL. - The project consisted of topographic survey, drainage improvements and roadway improvements for the purposes of providing flood protection for Taylor Lane located in the City of Dania Beach. Mr. Fernandez was the Project Surveyor and was responsible for conducting field data collection of above ground features including elevations and CAD drawing production for the later design, permitting and construction oversight for the improvements to this roadway. The design included creating roadside swales and retention areas, along with storm inlets and drainage piping system to convey the roadway stormwater run-off. The project also included raising sections of the roadway to meet Broward County roadway flood criteria. FDOT District 4, Broward County Transit Bus Shelter Project, Broward County, FL. This Design-Build, fast track, project consisted of providing ADA compliant bus shelters to 73 locations throughout the cities of Wilton Manors, Oakland Park and Pompano Beach, in Broward County. Mr. Fernandez was the project Land Surveyor responsible for the generation of topographic surveys along local roadways, recording all above ground features at all the sites, utilizing GPS equipment and coordinating work between survey crew, client and engineer. Fort Lauderdale Airport Runway Expansion Project, Fort Lauderdale, FL – this project proposes to expand the runway over US-1. Mr. Fernandez participated in the generation of topographic surveys in relation to the underground utility designs of engineering drawings for 16” Water Main, and 12” Force Main for utility relocations required for this project. Project also included a shared communication duct bank to relocate communication utilities along the corridor. Mr. Fernandez also provided periodic field visits to record as-built information of the communications duct-bank and provided survey controls during construction. Utility companies included AT&T, FPL, TECO, Comcast, FAA, Windstream, XO, CITGO, Buckeye Pipeline, Qwest, Verizon, Sprint, L3, etc. Pembroke Pines City Center, Pembroke Pines, Florida (SR-820 & Palm Ave.) - The Pembroke Pines City Center is a lifestyle center on a 115-acre site that provides new urbanism design mixing residential, commercial and retail all within walking distance in the City of Pembroke Pines. Mr. Fernandez was the overall Survey Party Chief and Surveyor Principal responsible for the topographic and boundary survey of a portion of the site ready for construction. Mr. Fernandez also conducted periodic visits to the site to stake out the different components of the project, to direct contractor as to the location of proposed improvements. Tasks included the stakeout of proposed roadways, light pole locations, building corners, underground utility as-built location and elevation, and horizontal and vertical plumb verification of concrete slabs for buildings. Hard Rock Stadium Pedestrian Bridges and Tunnels City of Miami Gardens, Florida. The City of Miami Gardens engaged a Design/Build firm to design, permit and construct pedestrian improvements at the Hard Rock Stadium in the City of Miami Gardens, which completed prior to a big event scheduled for February 2, 2020. Proposed pedestrian prefabricated metal bridge, fully enclosed with galvanized mesh, with minimum clearance of 17.5’, a span of approximately 145’, height of 15’ and 15’ of inside clear width, with concrete ramps and steps to provide ingress and egress to proposed pedestrian overpass. Proposed ramps and steps were constructed in private land, which access to the public will be uninterrupted, open 24 hours a day and an easement granted to the City of Miami Gardens to place proposed ramps in public land. Mr. Fernandez was responsible for the boundary and topographic survey for this project and plat review and drafting of legal sketch and descriptions for easements. ADA Compliant Bus Stop Improvement, Town of Miami Lakes, Miami Lakes, Florida. Mr. Fernandez was the project surveyor for this project which included the filed data collection, topographic survey, scope determination and the generation of demolition, new construction, and maintenance of traffic plans. Project provided the client with the design for ADA improvements to 11 bus stops locations, new bus shelters, concrete pads, sidewalks and amenities. Mr. Fernandez was responsible for the generation of survey files at the 11 sites to be used as base for the engineering design on this project. City of Opa-Locka Bus Stop Topographic Surveys, Miami-Dade County, FL - This project included performing topographic surveys in the City of Opa-Locka to provide new bus shelters at existing bus stop locations. For this project, Mr. Fernandez conducted Field Surveys that included the location of all above ground features, locate and translate benchmarks, generate elevations, easement and right-of-way determination for the addition of bus shelters at over 12 local roadway bus stops. Mr. Fernandez directs our crew to obtain field information and then reviews CAD drawings to be later provided to our engineering department for design purposes. ResumesPremiere Design Solutions, Inc. 82 ResumesPremiere Design Solutions, Inc. JORGE MICHEL OLMO SURVEY FIELD TECHNICIAN EDUCATION B.A. in Architecture, Central University of Villa Clara, Cuba 1996 Specialized Computer Aided Design & Drafting, Autodesk Technical Institute, Malaga, Spain 2010 Online Web Courses – Implementing New CAD Techniques (Tips and Shortcuts / Last Versions) FIELD OF SPECIALIZATION Topographic Surveys Field Data Collection Volume Determination ADA Compliance CAD Design Water & Sewer Drafting Permitting Construction Management Field Inspections Utility Coordination YEARS OF EXPEREINCE 20 Years EXPERIENCE SUMMARY Mr. Olmo is a seasonoed professional, Architect by study but experienced in engineering design and construction management with heavy experience in surveying related activities. He has over 20 year of experience in computer aided drafting and design of engineering and architectural projects and proficient in AutoCAD Civil 3D utilizing its tools, attributes, layering system and CAD set up environments. Mr. Olmo is experienced in Water and Sewer projects, as well as Structural and Architectural specialties. Mr. Olmo is also experienced in the generation of 3D models by using AutoCAD Architecture, Revit Architecture, Civil 3D, BIM, Sketch up Pro and Adobe Photoshop. Mr. Olmo has also been responsible for the field data collection of features and their representation on company projects including surveying drawings, civil engineering and land development project for our firm. Mr. Olmo serves as field technician and his attention to detail and ability to communicate effectively with other team members makes him an asset for all our projects. KEY EXPERIENCE Citywide CIP Water & Sewer Improvement Surveys, City of Opa-Locka, FL This project includes the topographic route surveys for over 200,000 LF of roadway to receive water and sewer improvements as part of the Capital Improvements Program (CIP) throughout the City of Opa-Locka. PDS is part of the Team to provide design criteria packages for the letting of this work. Mr. Olmo was the crew lead to collect all the invert elevations, direction and bottom elevations of all drainage structures and sanitary sewer structures within the project. Mr. Olmo was also responsible for locating lot corners and establishing property lines and right of way lines based on plat records and available information. Mr. Olmo also assisted in collecting all above ground features, elevations and commanding a second crew as needed to meet project schedules. Cairo Ln Topographic Survey, City of Opa-Locka, FL - This project was an emergency project to conduct a topographic survey of 2,600LF of roadway in the City of Opa-Locka. Project included the collection of all above ground features, spot elevations, recording of existing roadway conditions, and depiction of right-or- ways along this corridor. Mr. Olmo assisted in the collection of field data, and was responsible for generating the CAD drawings for this project. Various Roadway Intersections Surveys, Miami-Dade County, FL This project was to provide roadway intersection improvements at five different roadway intersections throughout Miami-Dade County. Mr. Olmo was tasked with collecting field data and drafting the topographic surveys which required the completion of five separated Specific Purpose Surveys with a very aggressive schedule. Each location included all visible relevant topographic features along the proposed site area, Right-Of-Way research and preparation, plat research and the submittal drawing was required to follow standards provided by the Client, including layers, line weights, colors, symbols, as required by Miami-Dade County. Medley Fire rescue Facility Survey, Medley, Miami-Dade County, FL This project was to replace the perimeter fence after the existing fence was damaged by recent storm events. The project site was an existing and Active Fire rescue Facility, of about 6.4 Acres, owned and maintained by Miami-Dade County. A field work for the specific purpose survey was conducted by Mr. Olmo, which included all visible relevant topographic features along the proposed site boundary, physical boundary demarcations, legal description, marking property corners, existing property lines and recorded easements and plat information as available in readily available public information records. Mr. Olmo also prepared CAD drawings for preparation of drawing deliverables. 83 JORGE MICHEL OLMO SURVEY FIELD TECHNICIAN ADA Compliant Bus Stop Improvement, Town of Miami Lakes, FL - Mr. Olmo was filed data collector utilizing GPS and Digital Data collector and project CAD drafter for this project which included the filed data collection, topographic survey, scope determination and the generation of demolition, new construction, and maintenance of traffic plans. Project provided the client with the design for ADA improvements to 19 bus stops locations, new bus shelters, concrete pads, sidewalks and amenities. Project included the coordination with Town, Miami-Dade Transit, conduct underground utility investigations and permitting. Saint Agnes Residential Development Survey, City of Miami, FL – Mr. Olmo was the field crew leader on the field data collection of all above ground features along the perimeter of this residential development on a 10 acre lot, for the installation of a perimeter fence. Mr. Olmo was responsible to collect lot corners, existing benchmarks, all above ground features and collect plat information to determine ROW and property lines. Project included boundary survey and a detailed survey of the entrance area for future development. Project was provided in state plane coordinates and NAVD 88 vertical datum. Alaqua Drainage Survey, City of Aventura, FL - Mr. Olmo was the crew field leader on the field data collection of all above ground features and underground drainage system information within the 5 acre lot of this residential high rise condominium building. Mr. Olmo was responsible to collect lot corners, existing benchmarks, all above ground features and collect plat information to determine ROW and property lines. In addition, Mr. Olmo was responsible to open all drainage structures, collect pictures, bottom elevation, invert elevation, pipe size material and direction and note general condition of drainage components. Project was provided in state plane coordinates and NAVD 88 vertical datum. Sidewalk Assessment and GIS Representation, City of Fort Lauderdale, Broward County – This project consisted in field data collection and assessment of the existing condition of all the existing sidewalks within the City of Fort Lauderdale, which consist of over 400 miles of sidewalks. Mr. Olmo was responsible for field data collection utilizing GPS devices that would later sync data collected with the GIS application developed for this project. Mr. Olmo assisted in the calculation of progress utilizing GIS tools build into the GIS system. FDOT District 4, Broward County Transit Bus Shelter Project, Broward County, Florida. This Design- Build project consists of providing ADA compliant bus shelters to 73 locations throughout the cities of Wilton Manors, Oakland Park and Pompano Beach, in Broward County. This project required the coordination between the design team consisting of civil engineers, structural engineers, electrical engineers, shelter manufacturer and our surveying team. Mr. Olmo assisted the field crew on this project by helping in the field data collection operation to be able to meet the strict schedule requirements set by the Design-Build Team. Water and Sewer Service Connection and Pump Station for Car Dealership, City of North Miami, FL – This project included the design of a new water and sewer connection for the development of a commercial site to house a new Car Dealership for Warren henry in North Miami, including the design of a new wastewater pump station rated at 65 gpm. Mr. Olmo conducted site verification services, including the location of above ground features, performed underground utility locations and recorded locations based on painted marking in the field. Mr. Olmo prepared CAD drawings depicting exiting conditions and proposed designs. Volume Determination Survey, Biscayne Landing, North Miami, FL. - Mr. Olmo has assisted as field data collector and has participated in the generation of CAD drawings for the collection of elevations required for the calculation of stock pile and lakes volumes within the boundaries of a mixed used development project currently under construction in North Miami known as Biscayne Landing. Project includes the collection of field data, location of benchmarks, generation of contours and volume calculations. NE 10th Street & NE 7th Avenue Improvements in Dania Beach, FL. Project consists of extension of NE 10th Street to the east to intersect with NE 7th Avenue and reconstruction of NE 7th Avenue from this intersection to the north to the intersection of Taylor Road. Project proposed water and sewer improvements along these roadway corridors. Tasks included topographic surveys, design of Civil plans, Utility coordination and worked with Broward County Environmental Regulation Division, Broward County Health Department and City of Dania Beach for Project permitting. Mr. Olmo was responsible for generation of As-Built drawings for water and sewer utilities on this project. ResumesPremiere Design Solutions, Inc. 84 ResumesUniversal Engineering Sciences, LLC Education BS, Civil Engineering, University of Florida Years of Experience 39 Licenses ■Professional Engineer, FL ■State of Florida General Contractor Affiliations ■American Society of Civil Engineers PROJECT EXPERIENCE Port of Miami Access Tunnel Miami-Dade County, Florida Peter served as Project Director for the complimentary geotechnical exploration program required by the Miami Access Tunnel (MAT) Concessionaire’s design/ build contractor Bouygues Civil Works Florida (BCWF). Field geotechnical exploration services included: standard penetration test (SPT) soil borings; Cone Penetrometer Testing (CPT); pavement cores; and field exfiltration tests. Laboratory test services include: sieve analysis; Atterberg Limits; organic content; pH; chloride; sulfate; resistivity; LBR, and rock characteristic tests such as compressive and split tensile tests. In addition, Universal is providing construction materials testing laboratory services for both the surface roadway and MSE construction, but also concrete compressive strength testing for the pre- cast concrete segmental sections being used in the tunnel construction. Sunset Harbor Parking Garage City of Miami Beach, Florida As part of our continuing contract with the City of Miami Beach, Peter served as Project Manager for the construction materials testing services for this new mixed-use project. The building consists of 29,350 SF of ground floor retail and 141,000 SF of parking on 4 levels above grade, accommodating a total of 435 parking spaces. The building has been designed following the criteria for energy efficient, sustainable design as set forth by the United States Green Building Council. Testing services included pile load test and installation monitoring, concrete testing, and welding inspection. Wal-Mart Supercenters Palm Beach, Broward, and Miami-Dade Counties, Florida Peter has served as Senior Engineer on twenty completed Supercenter and/ or Neighborhood Market projects and continues to serve on current projects, which consist of concrete masonry buildings approximately 220,000 square foot in size with associated paved areas and roadway improvements. Geotechnical engineering services included soil boring explorations, soil classifications, engineering analysis for foundation design, site preparation, groundwater control, and pavement design. Peter G. Read, PE Regional Manager- Geotechnical Consultant Peter Read has 39 years of project management and field experience in the construction industry and is responsible for client development, proposal preparation and contracting for environmental/geotechnical engineering activities. Peter works closely with the materials testing and environmental/geotechnical engineering staff to ensure that projects are fully staffed and properly performed in order to meet our client’s needs. Peter has expertise in: Geotechnical/Environmental Engineering and Construction Materials Testing Services; Soil and Groundwater Assessment and Remedial Design; Subsurface Soil Explorations, Foundation Design/Evaluation, and Construction Monitoring; Materials Testing Services Including Laboratory and Field Testing and Both Destructive and Non-Destructive Testing. 85 ResumesUniversal Engineering Sciences, LLC Education MS, Geotechnical Engineering, Missouri University of Science and Technology BS, Civil Engineering, Florida International University Years of Experience 16 Years with Firm 7 Licenses ■Professional Engineer, FL PROJECT EXPERIENCE Turnpike Continuing Services Contract (C93K1) Miami-Dade County, Florida Reinaldo is currently serving as the point of contact between our Miami Branch and our Contract Manager for this contract. To date, services have including soils, asphalt and concrete laboratory materials testing, vibration monitoring, and asphalt plant inspections. SR 874 Reconstruction (MDX #87404) Miami-Dade County, Florida Reinaldo previously served as project geotechnical engineer for support of the CEI contract on this project. Primary duties including overseeing all aspects of foundation installation, which included auger-cast pile installation for sound barrier walls, drilled shaft installation for miscellaneous structures, and driven pile foundations for bridge widening. SR 836 Extension from NW 107th Avenue to NW 137th Avenue (MDX #83605) Miami-Dade County, Florida Reinaldo served as staff engineer during both design and construction phases for bridges, retaining walls, roadway widening and miscellaneous items. MDX Central Blvd. Widening and Reconstruction Design-Build Miami-Dade County, Florida Reinaldo previously served as project geotechnical engineer during design and construction phases. He is responsible for field exploration and laboratory testing programs. He performed geotechnical engineering analyses and design for foundation elements of eight bridge widening/replacements, retaining walls, sign structures and mast arms. He prepared the geotechnical engineering reports containing recommendations for foundation design and construction for all foundations. SR 836 Eastbound Auxiliary Lane Design-Build (MDX # 83622) Miami-Dade County, Florida Reinaldo previously served as project geotechnical engineer for the design and construction phases. Project included providing geotechnical and foundation design services for bridge widening, retaining walls, roadway widening, sign structures, and more. Also, construction phase included inspection of foundation elements. Reinaldo Villa, MS, PE Miami Branch Manager, Senior Geotechnical Engineer Reinaldo Villa has 16 years of project management, engineering analysis/design and field experience in the geotechnical industry and is responsible for client development, project proposals and geotechnical engineering activities. He currently serves as Universal’s branch manager for the Miami office overseeing all aspects of geotechnical, environmental and materials engineering. Reinaldo has an extensive amount of experience with transportation-related projects, specifically design-build contracts with government agencies. He has been involved with designing shallow and deep foundations for bridges, retaining walls, buildings, noise walls, signs and lighting poles. He has experience inspecting and overseeing the installation of various foundation systems consisting of spread footings, driven piles, drilled shafts, auger-cast piles, steel piles, and other structural components. Additionally, he has gained experience providing practical and cost-effective solutions to deal with problematic soils encountered during roadway construction. 86 ResumesUniversal Engineering Sciences, LLC Education BS, Civil Engineering, Florida International University Years of Experience 8 Licenses ■Engineer Intern, FL Certifications ■CTQP Drilled Shaft Inspector ■CTQP Pile Driving Inspector ■CTQP Auger-Cast Pile Inspector PROJECT EXPERIENCE MDX Central Blvd. Widening and Reconstruction Design-Build Miami-Dade County, Florida Steve served as a staff geotechnical engineer during the design and construction phases. Primary duties included test boring layout, utility clearances, drafting, inspection of driven pile foundations and inspection of drilled shaft foundations. Venetian Causeway Bridge Reconstruction Miami-Dade County, Florida The project includes construction of 32 54-inch diameter drilled shaft foundations for the new bridge. Steve is responsible for coordinating field drilled shaft inspections, reviewing paperwork for completeness and technical accuracy, tracking and reporting concrete cylinder breaks and coordinating CSL testing on drilled shafts. Port of Miami Tunnel and Access Roadways – Overhead and Cantilever Sign Structures Miami-Dade County, Florida The project included installing several sign structures along roadways for the proposed tunnel construction. Steve was a senior drilled shaft inspector as well as responsible for oversight of all drilled shaft inspection operations, coordinating field drilled shaft inspections, reviewing paperwork for completeness and technical accuracy, tracking and reporting concrete cylinder breaks and coordinating CSL testing on drilled shafts. SR 826 Improvements Section 5 Miami-Dade County, Florida The project includes complete reconstruction of the SR 836 and SR 826 interchange. Steve provided pile driving inspection services on an as-needed basis for bridge construction. NW 36th Street Bridge Reconstruction over the Miami River Miami-Dade County, Florida The project includes complete reconstruction of the NW 36th Street bascule bridge over the Miami River. Steve provided pile driving inspection services on an as-needed basis for bridge construction. Broward County Mast Arm Conversion (Group 1) Broward County, Florida The project included installation of mast arms for 20 intersections. Steve is responsible for coordinating field drilled shaft inspections and reviewing paperwork for technical accuracy. Steve Jaime, EI Staff Engineer Steve Jaime has eight years of field experience in the geotechnical industry and is responsible for helping project managers and project engineers prepare geotechnical reports for both public and private sector projects. He has experience inspecting and overseeing the installation of various foundation systems for bridges, walls, signs, buildings, lighting, and utilities. His foundation systems inspection and testing experience includes spread footings, driven piles, drilled shafts, auger-cast piles, helical piles, and other structural components. Steve also has experience with installation and recording data from geotechnical instrumentation, including piezometers, thermistors, inclinometers and extensometers. 87 ResumesPMM Consulting Engineers, Corp. PMM Consulting Engineers, Corp. * Projects reflected above include Individual Experience of Mr. Paul Martinez, PE Paul A. Martinez, PE 1 | Page Mr. Martinez has over 30 years of experience in structural engineering design and inspection in the areas of buildings, environmental structures, marine facilities as well as park facilities. Mr. Martinez provides design and preparation of construction documents for projects that have included new construction, remodeling, renovations, additions, ADA upgrades, life safety issues, code compliance, 40-year certifications and inspections. In addition, Mr. Martinez has provided construction administration services which have included cost estimates, bidding assistance, contractor selection assistance, attendance at pre-construction meetings, bid-meeting, assistance with RLI's, verification and approval of pay requisitions based on inspections of the completeness of the project. These services have varied on the individual needs of the clients. Mr. Martinez’s institutional related project experience includes: Miami Dade College Continuing Services Contract, Miami, FL. PMM Consulting Engineers, Corp. was awarded a contract to provide structural engineering services on a Task Order basis where the construction costs would not exceed $200,000. Task orders to date have included: • Building 1000 Woflson Campus Cooling Tower Structural reinforcing. Project included analyzing the structural integrity of the ageing concrete structural elements that support/brace precast concrete panels. The results showed a need for repairs/restoration to the concrete elements surrounding the precast concrete panels. • Building 7000 Pool Repairs. Due to equipment repairs and replacements to the pool area there was a need for structural improves which included the pool equipment room, chemical storage room, pool deck, pool coping, perimeter concrete guard wall and concrete stands. • Wolfson Campus Rooftop Structural Repairs. Based on site inspections performed it was determined there was a need for contractor to install additional “hairpins” around the column for reinforcements. PortMiami Continuing Services Contract - Capital Development Program, Port of Miami, Miami, FL- Dodge and Lummus Island Development. Provided design and construction administration services for a series of projects during the development of both Dodge and Lummus Island. Some of the project included: o Gantry Crane Support Rail and Bulkheads - Lummus Island - Wharf II through Wharf VI o Rubber Tire Gantries (RTG's.) at the Maersk site located at the East end of Lummus Island o North Roll on/Roll off Platforms - Lummus Island o South Roll on/Roll off Platforms – Lummus Island o Southwest Terminal Bulkhead - Dodge Island o Passenger Terminal 6 & 7 Bulkhead - Dodge Island o MSRC warehouse and bulkhead facility o Container berths The Cassina at Vizcaya Museum and Gardens, Miami, FL. Structural repairs to the Cassina where concrete columns and beams were spalling. Testing was performed to evaluate the structural integrity and chorine content in the concrete which was causing the steel reinforcement to corrode. After performing testing, it was determined there was a need to remove and replace the columns. Mr. Martinez was personally involved during the testing, design and implementation of the repairs. Paul A. Martinez, PE Structural Engineer Education Bachelor of Science Civil/Structural Engineering, University of New Haven, 1983 Registrations Professional Engineer States of: FL Professional Affiliations Florida Structural Engineering Association 88 PMM Consulting Engineers, Corp. * Projects reflected above include Individual Experience of Mr. Paul Martinez, PE Paul A. Martinez, PE 2 | Page Christopher Columbus High School Locker Rooms, Miami, FL. To complement their athletic program, Construction Documents and Construction Administration Services were provided for an 1,000 SF office and locker room for the baseball team. Christopher Columbus High School - Pedestrian Bridge, Miami, FL. To reduce the time it takes the students to get from one class to another, Construction Documents and Construction Administration Services were provided for a cast-in-place concrete pedestrian bridge (75’ long x 11’ wide) that connected the second floor of various classroom buildings. New Visitors Environemntal Center, Kendall campus, Miami Dade College, Miami, FL. PMM Consulting Engineers, Corp. was the Engineer of Record for Miami Dade College’s Environmental Center at the Kendall Campus. Visitors now have the opportunity to learn and study the South Florida habitats for its unique flora and fauna. The 1,000 +/- SF pavilion is described as “off the grid” state-of-the-art facility which utilized solar panels, a composting toilet and rooftop rainwater collector plus other features designed to LEED Platinum standards. Locally harvested materials and reused wood provided mulch around the building grounds. The Center is located on a strip of land on the NW corner of the Miami Dade College Kendall campus. City of Miami Plan Review and Inspection Services, Citywide. This continuing services contract was awarded in 2012. Current assignment includes plan review services and plan processing for various types of facilities located within the City of Miami. These facilities include residential, commercial, institutional and industrial. Pier 60 Beachfront Park, Clearwater Beach, FL. Renovations of an existing park to a new three-acre beachfront park with such amenities as a concession area, two covered play grounds, seat walls, benches, showers, bike racks and a multipurpose pavilion. Family Water Theme Park, Clearwater, FL. A proposed one-acre improvement designed to accommodate approximately 100 patrons for lap, instructional and freestyle swimming techniques. The project included an office, restroom facilities, a breezeway, a ticket booth, fencing, gates, sidewalks, pool decks, lighting, signage and landscaping. Crandon Park Cabanas, Miami, FL. Renovation of a two-story building consisting of 50 public cabana units and housing, restroom facilities measuring over 10,800 SF. Plans were prepared to retrofit a 1950's style building incorporating current ADA Compliance and current code compliance. Advantage Academy, Miami, FL. Design of 48,000 SF charter school located in Miami Dade County. School consisted of classrooms, meeting rooms, administrative offices, teachers’ lounge, art room, cafeteria, storage areas, janitorial closets, physical educations areas, etc… The facility consisted of a two-story load bearing masonry structure where the first elevated floor consisted of pre-stressed pre-cast concrete joists supporting a concrete slab, the roof consisted of open web steel joists supporting a metal decking; all on spread foundations. Christopher Columbus High School Wrestling Room, Miami, FL. As a result of decay, the 800 SF wood roof to one of the ancillary buildings of the 180,000 SF facility required replacement. Construction documents and Construction Administration Services were provided to remove the damaged wood roof structure and replace with a new long-lasting steel roof structure ResumesPMM Consulting Engineers, Corp. 89 ResumesPMM Consulting Engineers, Corp. PMM Consulting Engineers, Corp. 1 | Page Mr. Herrera has over 10 years of experience providing structural engineering services, design, inspections and preparation of construction documents for a variety of projects. Projects have varied from car washes, warehouses, residential developments, religious, commercial, etc. Project experience includes: Bosaniko Development, Weston, FL. High-end gated residential single-family housing development. Homes start at $1.9M. The project won multiple AIA awards. ETARU Japanese Restaurant, Fort Lauderdale, FL. The addition of a mezzanine area at 5000 East Las Olas Blvd. Marlin’s Apartments, Miami, FL. Three story 15,000 SF apartment building which includes 2-bedroom apartments. Seavee Boats New Warehouse Facility, Medley, FL. A 145,000 SF warehouse facility which includes manufacturing areas for new motor boats, offices, storage areas, restrooms, etc. El Car Wah Facilities, Various locations throughout Miami, FL. Over 10 new car wash facilities that offer the customers a drive through car wash facility and supplemental areas to vacuum and detail the vehicles. Forest Mere Apartments, Naples/Fort Myers, FL. Over 9,000 Sf of 2 story apartments. Port of Miami, Miami, FL. Relocation of several trailers including required structural support, etc. Christopher Columbus Baseball Field House Addition, Miami, FL. Enlarged existing field house to a two-story facility which included additional lockers, storage, changing rooms and additional support areas. The addition was ADA compliant. Apostolic Church, Cutler Ridge, FL. A new 6,500 SF Christian church which included offices, restrooms, mezzanine, and areas of worship. Family Dollar Stores, various locations throughout Miami, FL. Completed 8 stores varying in size from 4,500 to 6,000 SF. An additional two stories are currently under design. Stores include stockrooms, restrooms, storage, registers and consumer areas. Manuel J. Herrera, EIT Structural Engineer Education Civil Engineering, Universidad del Norta, Barranquilla, Colombia, 2015 Civil Engineering Degree 90 ResumesPMM Consulting Engineers, Corp. PMM Consulting Engineers, Corp. Mr. Yasel has over 17 years of experience in structural engineering drafting and inspections in the areas of marine structures, as well as commercial, educational, environmental, and housing projects. Mr. Yasel provides drafting support and services on all PMM's projects. Several project examples include: • Cruise Terminals F & G Remodeling, PortMiami, Miami, FL. Scope includes cruise terminal architectural and engineering planning, design and post designer services for repairs, upgrades, interior finish improvements and possibly new construction. Projects that may fall within this project include the following: building envelopment systems, horizontal and vertical circulation, parking facilitates, provisioning facilities, comfort stations and increasing restroom level of services. This is an on-going project and the extent of the entire scope has yet to be defined. • Capital Development Program, Port of Miami, Miami, FL. Dodge and Lummus Island Development. Provided design and construction administration services for a series of projects during the development of both Dodge and Lummus Islands. Projects included: o Seaboard Marine Site, PortMiami, FL. Mr. Sosa coordinated the drafting efforts with the consultants for this site which was re- developed as a heavy industrial container yard. PMM developed structural plans for the drainage structures as well as for all the high mast lighting. • Crandon Park Marina, Key Biscayne, FL. The seawall adjacent to the boat ramps built circa 1950 was showing signs of deterioration because of age and prop wash. After performing an underwater inspection, it was determined that the best course of action was to replace the existing concrete sea wall with a new sheet pile wall which should have a 50-year life expectancy. Mr. Martinez was personally involved during the testing, design and will be involved in the implementation of the repairs. • Advantage Academy, Miami, FL. Design of 48,000 SF charter school located in Miami Dade County. School consisted of classrooms, meeting rooms, administrative offices, teachers’ lounge, art room, cafeteria, storage areas, janitorial closets, physical educations areas, etc… The facility consisted of a two-story load bearing masonry structure where the first elevated floor consisted of pre-stressed pre-cast concrete joists supporting a concrete slab, the roof consisted of open web steel joists supporting a metal decking; all on spread foundations. • Christopher Columbus High School Locker Rooms, Miami, FL. To complement their athletic program, Construction Documents and Construction Administration Services were provided for an 1,000 SF office and locker room for the baseball team. • Christopher Columbus High School - Pedestrian Bridge, Miami, FL. To reduce the time, it takes the students to get from one class to another, Construction Documents and Construction Administration Services were provided for a cast-in-place concrete pedestrian bridge (75’ long x 11’ wide) that connected the second floor of various classroom buildings. Education Bachelor of Science Civil Engineering ISPJAE University 2005 Miami Dade College Additional Studies to for Career Advancement and Improvement 2008 - 2009 Yasel Sosa Structural Drafter 91 RR.. HHaarrvveeyy SSaassssoo,, PPEE PPrreessiiddeenntt EEdduuccaattiioonn Master of Science, Civil Engineering, Queen’s University, Kingston, Ontario, Canada, 1981 Bachelor of Science, Civil Engineering, Queen’s University, Kingston, Ontario, Canada, 1979 LLiicceennssuurree Professional Engineer, FL PPrrooffeessssiioonnaall AAffffiilliiaattiioonnss Florida Shore and Beach Preservation Association SSppeeaakkiinngg EEnnggaaggeemmeennttss “Artificial Reef Construction: An Engineered Approach”, R.H. Sasso, T.K. Blankenship, S. Higgins, and K. Banks, Feb. 2004 National Conference on Beach Preservation Technology “Mooring Buoys for the Largest Cruise Ship in the World,” J. Juhl, T.K. Blankenship, and R.H. Sasso, Proceedings, Ports 2001 Conference “Village of Key Biscayne Beach Renourishment and the Management of Offshore Seagrasses,” Cameron Perry and Harvey Sasso, P.E., Proceedings of the 2001 National Conference on Beach Preservation Technology “Miami Beach 32nd Street Hot Spot: Numerical Modeling and Design Optimization,” Adam Shah and Harvey Sasso, P.E., Proceedings of the 2001 National Conference on Beach Preservation Technology Founding Partner Harvey Sasso brings over 35 years of demonstrated commitment to the engineering of coastal and waterfront projects throughout Florida and the Caribbean. As a professional coastal engineer, Harvey possesses expertise in coastal planning, beach management, and waterfront development. Harvey has a reputation for providing a business-oriented approach to engineering solutions, with decades of planning, designing, and implementing numerous coastal/waterfront development projects throughout Florida and the Caribbean. Harvey has been involved in all aspects of coastal/marine projects, including project design, engineering analysis, environmental permitting, and the legal, political, and managerial elements of project implementation. Harvey has led teams for a number of public projects, including the Coastal Inundation and Economic Vulnerability Study for Bal Harbour Village, which was made possible through a grant funded by the Florida Department of Environmental Protection’s Resilient Coastlines Program, acquired by Coastal Systems. With extensive experience and expertise in coastal planning, he understands the significance of resilience, feasibility, construction costs, public outreach, and economic assessment relative to engineering design – especially in light of ever- increasing challenges associated with climate change and sea level rise. His years of experience within the coastal environment has allowed him to serve as a speaker at the 2019 Florida Climate Change Compact, addressing Resiliency and Economic Impacts of Climate Change. Harvey is routinely incorporating resiliency and sustainability elements into his projects. Harvey was part of the team collaborating with the City of Miami Beach on their Historic District Resiliency & Adaptation Guidelines, providing his coastal engineering expertise, predicting flood impacts from hurricane storm surge, sea level rise and rainfall flooding under present and future conditions. His interest in economics and financing complements his coastal engineering design capabilities when making critical development decisions during a project’s early stages. Specifically, he believes each coastal project must consider resiliency as applied not just to the project’s own longevity, but also to assess flood protection benefits to surrounding developments. BBeeaacchhwwaallkk II,, MMiiaammii BBeeaacchh Design, permitting, public engagement and construction administration services of on-grade paver block walkway, connecting Lummus Park to 21st St. BBiillll BBaaggggss CCaappee FFlloorriiddaa SSttaattee PPaarrkk,, KKeeyy BBiissccaayynnee Design and permitting of 4000 ft of seawall revetment with fishing piers for public access. CCooaassttaall IInnuunnddaattiioonn && EEccoonnoommiicc VVuullnneerraabbiilliittyy SSttuuddyy,, BBaall HHaarrbboouurr Assessment of Village’s vulnerability to sea level rise and storm surge. Performing economic impact assessment of the cost of “doing nothing.” Obtained grant from FDEP Resilient Coastlines Program. 3322nndd SSttrreeeett HHoottssppoottss,, MMiiaammii BBeeaacchh Coastal engineering and numerical modeling for coastal breakwaters and sand recycling project to stabilize shoreline at hot spot erosional area. BBaakkeerr’’ss HHaauulloovveerr IInnlleett,, BBaall HHaarrbboouurr Analyzed over 20 years of data relating to the Inlet and adjacent beaches to evaluate the performance of the Inlet, its impact on adjacent beaches and performance of the historical inlet management strategy. BBaall HHaarrbboouurr JJooggggiinngg PPaatthh,, BBaall HHaarrbboouurr Design, permitting, bidding and construction management of jogging path relocation and dune restoration. Managed demolition of existing eroded jogging path, and removal of non-native invasive vegetation from beach dune system. ResumesCoastal Systems International, Inc. 92 RR.. HHaarrvveeyy SSaassssoo,, PPEE PPrreessiiddeenntt “Regional Beach for Three Consecutive Barrier Islands in South Florida,” Paul C.-P. Lin, Ph.D., P.E., R. Harvey Sasso, P.E. and C. Anthony Spell, Proceedings of the 1997 National Conference on Beach Preservation Technology “Combined Sand Bypassing and Navigation Improvements at Hillsboro Inlet, Broward County, Florida: The Importance of a Regional Approach,” Dr. Paul C.-P. Lin, P.E., Inger Hansen, and R. Harvey Sasso, P.E., Proceedings of the 1996 National Conference on Beach Preservation Technology, St. Petersburg, Florida, 1996, pp. 43- 59. Restoration Plan PPaallmm BBeeaacchh CCoouunnttyy RReeggiioonnaall SSeeddiimmeenntt BBuuddggeett Providing coastal engineering services to develop a regional sediment budget for the County’s shoreline. Cost of historical beach nourishment documented. Conducted assessment of cost-sharing associated with county-wide beach management against benefits to individual stakeholders. PPeeaannuutt IIssllaanndd EEnnvviirroonnmmeennttaall RReessttoorraattiioonn,, PPaallmm BBeeaacchh CCoouunnttyy Coastal/civil and marine structures design for 1.5-acre artificial reef habitat and 1.3- acre shallow seagrass lagoon. Design of tidal pond and flushing channel, shallow- draft marina with floating docks, pedestrian boardwalks, and site utility upgrades. VViillllaaggee ooff KKeeyy BBiissccaayynnee BBeeaacchh NNoouurriisshhmmeenntt Coastal engineering and environmental permitting for 120,000 cy beach fill project. Marine resource and hydrographic surveys conducted, along with sand source search, jet probes, vibracores, and marine archeological surveys. DDiinnnneerr KKeeyy MMaarriinnaa,, MMiiaammii Design and environmental permitting for 110-slip marina and 600-foot bulkhead replacement. Mitigation design provided and maintenance dredging designed. FFtt.. ZZaacchhaarryy TTaayylloorr SSttaattee PPaarrkk BBrreeaakkwwaatteerrss,, KKeeyy WWeesstt Coastal engineering design and environmental permitting for breakwaters, jetties, and beach fill project for shoreline protection at park. HHiissttoorriicc DDiissttrriicctt RReessiilliieennccyy && AAddaappttaattiioonn GGuuiiddeelliinneess,, MMiiaammii BBeeaacchh Developed guidelines and regulations for the renovation, raising, and/or re- purposing of historic structures in low- lying areas of Miami Beach that are vulnerable to ongoing/increasing tidal flooding and long-term impacts of sea level rise. MMiiaammaarriinnaa,, MMiiaammii Design and environmental permitting for 130-slip marina. Coastal engineering design including numerical modeling and physical model tests were conducted for the wave baffle design. ResumesCoastal Systems International, Inc. 93 ResumesCoastal Systems International, Inc. AAnnddrreess PPeerreezz,, PPEE EEnnggiinneeeerriinngg DDiirreeccttoorr EEdduuccaattiioonn Bachelor of Science in Civil Engineering, Florida International University, Miami, Florida, 2001 LLiicceennssuurree Professional Engineer, FL AAwwaarrddss Maurice A. Ferré Park, Miami, FL American Society of Civil Engineers – Civil Engineering Project of the Year (2014-2015) Miracle Mile & Giralda Ave. Streetscape, Coral Gables, FL Cuban American Association of Civil Engineers – Project of the Year (2019) Andres Perez, with over 20 years of engineering experience in Florida and throughout the Caribbean, serves as Director. Andres has led multi-faceted project teams in the engineering design for a variety of projects, including those involving dredging, beach renourishment, seawalls, bulkheads, marinas, shoreline stabilization and other marine/coastal structures. His experience in coastal development in South Florida and within Miami Beach include design and construction administration of marine/coastal structures. Andres utilizes his experience in project management to coordinate with clients’ Project Managers and lead a design team to execute clients’ vision. His experience encompasses the planning, design and construction administration for marine/coastal projects. His experience in Florida also includes the environmental permitting of projects through agencies such as the Florida Department of Environmental Protection (FDEP), Department of Environmental Resource Management and U.S. Army Corps of Engineers. Andres has managed the processing of marine/coastal designs through these agencies to obtain the required approvals, which required extensive experience with projects adjacent to the coast and/or waterfront. These projects have required coordination with diverse project teams to design systems that meet the development programming goals for both public and private sector clients and the stringent regulatory permitting criteria to manage the protection of our valuable marine resources. CCuurrrriiee PPaarrkk,, WWeesstt PPaallmm BBeeaacchh Marine engineering and environmental consulting services for design of staging dock, deteriorated boat ramp and maintenance dredging. FFeerrnn IIssllee PPaarrkk,, MMiiaammii Shoreline stabilization design and environmental permitting of 500 feet of canal bank and 40-ft kayak launch ramp. Drone surveying, parking lot demolition plans, site grading plans, bidding assistance and construction administration services provided. HHaauulloovveerr MMaarriinnee CCeenntteerr,, NNoorrtthh MMiiaammii BBeeaacchh Marine and site/civil improvements for redevelopment of new marina facility with 400 feet of bulkhead. Provided surveying, water and sanitary sewer design, utility coordination, and construction administration services. Redesigned sheet pile bulkhead with augercast pile-supported reinforced concrete forklift launching platform. BBaayysshhoorree PPaarrkk,, MMiiaammii BBeeaacchh Providing site civil engineering and environmental permitting services for proposed 20-acre park comprised of lake, walking trails, boardwalks and promenade. Lake design incorporates the treatment of stormwater runoff for surrounding neighborhood. BBeeaacchhwwaallkk IIII,, MMiiaammii BBeeaacchh Civil/coastal engineering design and environmental permitting for on-grade paver walkway connecting South Pointe Park, Marjory Stoneman Douglas Park, and Lummus Park in the South Beach district of Miami Beach. CCaapprrii SSoouutthh BBeeaacchh,, MMiiaammii BBeeaacchh Paving, grading and drainage design for 3 residential complexes and underground parking garage next to Biscayne Bay, covering 2 city blocks. Design of water main extensions for each street, fire, sanitary services, street ends and storm drainage system improvement for the neighborhood with associated pump stations. 94 ResumesCoastal Systems International, Inc. AAnnddrreess PPeerreezz,, PPEE EEnnggiinneeeerriinngg DDiirreeccttoorr MMaauurriiccee AA.. FFeerrrréé PPaarrkk,, MMiiaammii Civil engineering design and permitting for 24-acre bayfront park. Design included a stormwater management system that combines drainage wells with exfiltration trenches along with retention areas and water/sewer services. MMaauurriiccee GGiibbbb MMeemmoorriiaall PPaarrkk,, MMiiaammii BBeeaacchh Design, planning, permitting of 2-acre waterfront park. Design elements include living shoreline, seawall, overwater viewing platform and MONSTRUM playground. Led public workshops in coordination with City. MMiiaammii DDDDAA BBaayywwaallkk--RRiivveerrwwaallkk,, MMiiaammii Developed comprehensive plan and design guidelines for seawalls, living shorelines and civil engineering involved in pedestrian path adjacent to Biscayne Bay and Miami River. Assisted in Unifying Design Elements (UDEs) with proposed dimensions, materials and finishes, comparable images and illustrations. Developed a statement of costs and assisted in finalizing implementation plan and maintenance strategy. Participated in public meetings. MMiirraaccllee MMiillee && GGiirraallddaa AAvvee.. SSttrreeeettssccaappee,, CCoorraall GGaabblleess Civil engineering, stormwater management and permitting services for 11.5 acres of streetscape in downtown Coral Gables. NNoorrtthh BBeeaacchh RReeccrreeaattiioonnaall CCoorrrriiddoorr ((NNBBRRCC)),, MMiiaammii BBeeaacchh Design and environmental permitting of multi-purpose public access corridor to traverse along the western edge of the beach dunes between 64th Street and 79th Street. Design encompasses 15 blocks and three city parks. HHiillllssbboorroo IInnlleett DDiissttrriicctt SSoouutthh JJeettttyy RReessttoorraattiioonn,, BBrroowwaarrdd CCoouunnttyy Marine engineering design for breakwater structure replacement consisting of 400 feet of sheet pile and 1,020 tons of riprap. Field investigations conducted, environmental permits obtained, bidding, and construction administration services provided. IIssllaanndd GGaarrddeennss MMeeggaa YYaacchhtt HHaarrbboouurr,, MMiiaammii Marina design and environmental permitting for 50-slip megayacht harbor on Watson Island as part of $600M site redevelopment. Design of dredging, mitigation, fixed piers, and utilities for vessels up to 450 feet long. JJoossee MMaarrttii PPaarrkk,, MMiiaammii Site/civil engineering for a 1-acre project site development with a community gymnasium. Paving, grading, stormwater management and water/sewer services provided. Street improvements designed for SW 5th Street. KKeennnneeddyy PPaarrkk,, MMiiaammii Shoreline stabilization/enhancement design and environmental permitting for 1,640 feet of shoreline in 4-acre waterfront park. Mangrove and upland vegetation surveys conducted. Exotic vegetation removed and living shoreline designed with mangrove planters and revetment. Creation of public view corridors through vegetation. Bidding and construction administration services provided. MMaarriinnee SSttaaddiiuumm RReessttoorraattiioonn,, MMiiaammii Marine/civil engineering design and environmental permitting of 515-ft seawall replacement, structural pile repairs and overwater concrete deck for historical outdoor waterfront stadium. Structural investigations and marine resource surveys conducted. 95 ResumesCoastal Systems International, Inc. MMeeggaann RReeiissiinngg SSeenniioorr EEnnvviirroonnmmeennttaall // PPeerrmmiittttiinngg PPrroojjeecctt MMaannaaggeerr EEdduuccaattiioonn Master of Science, Biology, Florida Atlantic University, Boca Raton, Florida, 2013 Bachelor of Science, Ohio State University, Columbus, Ohio, 2011 PPrrooffeessssiioonnaall AAffffiilliiaattiioonnss The South Florida Association of Environmental Professionals The International Sea Turtle Society CCeerrttiiffiiccaattiioonnss PADI Advanced Open Water Diving Certified, 2014 Scuba Diving International Computer Nitrox Diver Certified First Aid and CPR 2019 Oxygen First Aid for Scuba Diving Injuries 2019 PPuubblliiccaattiioonnss Reising, M., M. Salmon, and S. Stapleton. (2015) Hawksbill nest site selection affects hatchling survival at a rookery in Antigua, West Indies. Endangered Species Research 29:179-187 Salmon, M. and M. Reising (2014) Emergence rhythms of hatchling marine turtles: Is a time sense involved? Chelonian Conservation and Biology: December 2014, Vol. 13, No 2, pp 282-285 Salmon, M., M. Reising, and S. Stapleton (2016) The evolution of hatchling morphology. Marine Turtle Newsletter No 149, pp 9-12 Megan Reising, with over 10 years of experience in the marine, environmental and regulatory realms, serves as a Senior Environmental / Permitting Project Manager. She holds expertise in marine, coastal, and restoration projects, as well as environmental permit applications at the local, county, state, and federal levels. Her areas of focus include coastal and marine site development, specifically project permitting strategy and mitigation. Megan manages projects throughout all phases of completion. She maintains relationships with various environmental agencies such as the Florida Fish and Wildlife Conservation Commission (FWC), Florida Department of Environmental Protection (FDEP), South Florida Water Management District (SFWMD), and U.S. Army Corps of Engineers (USACE), as well as local municipalities in Miami-Dade, Broward, Martin, Lee, and St. Lucie counties. Megan has extensive knowledge of marine biology and coastal regulations in Florida and throughout the Caribbean. She coordinates with project teams and regulatory agencies, monitors the environmental permit process, and drives projects through implementation. Megan has extensive experience as a field biologist, comprised of conducting marine benthic resource surveys, seagrass restoration, coral health monitoring and relocation, ecological impact assessments, population monitoring, habitat mapping surveys, and identification of numerous federally listed endangered species. 770011 BBrriicckkeellll AAvveennuuee,, MMiiaammii Environmental permitting and engineering design for proposed multi- slip dock located in the Biscayne Bay Aquatic Preserve. 11220011 BBrriicckkeellll BBaayy AAvveennuuee,, MMiiaammii Environmental permitting and engineering design for proposed multi- slip dock with mangrove planters and over-water nature boardwalk. CChhaatteeaauu BBeeaacchh,, SSuunnnnyy IIsslleess BBeeaacchh Provided marine turtle lighting consultation (including external, emergency, and signage features) for condominium tower, garage and swimming pool. Submitted package for FDEP marine turtle lighting review. EEvveerrggllaaddeess SSaaffaarrii PPaarrkk,, MMiiaammii Environmental permitting and engineering design of 3-acre park improvements to adapt to water level rise. Design elements include ticket gazebo, waiting area, floating docks, fuel systems, potable water system, parking lot improvements, drainage restoration and pedestrian access bridge. Conducted wetland delineation to facilitate FDEP Environmental Resource Permit, Corps permit, and SFWMD permit. FFiirrsstt PPrreessbbyytteerriiaann CChhuurrcchh,, MMiiaammii Shoreline stabilization design and environmental permitting of 220 feet of seawall, bulkhead and baywalk. Secured final permits from Miami-Dade, the FDEP, and Corps. Conducted marine resource survey. HHiillllssbboorroo IInnlleett MMaannaaggeemmeenntt,, BBrroowwaarrdd CCoouunnttyy Continuing consultation services with District regarding inlet management activities including annual bypass reporting, permitting of jetty improvements, marine resource mapping, coral relocation, and compliance assistance. KKeennnneeddyy PPaarrkk,, MMiiaammii Marine engineering design and environmental permitting of overwater boardwalk replacement. Facilitated permitting applications, processing, and agency compliance. 96 MMeeggaann RReeiissiinngg SSeenniioorr EEnnvviirroonnmmeennttaall // PPeerrmmiittttiinngg PPrroojjeecctt MMaannaaggeerr MMaacceeoo PPaarrkk,, MMiiaammii Environmental permitting and marine engineering design for improvements to boat ramp, fixed wooden docks, floating dock, kayak launch, riprap repair and regrading parking lot. Secured permits from Miami-Dade, the FDEP, Corps, and City of Miami Building Department. Conducted benthic survey. MMaauurriiccee GGiibbbb MMeemmoorriiaall PPaarrkk,, MMiiaammii BBeeaacchh Design, planning, permitting of 2-acre waterfront park. Design elements include living shoreline, seawall, overwater viewing platform and MONSTRUM playground. Conducted marine resource survey. MMiiaammaarriinnaa –– PPiieerr 55,, MMiiaammii Environmental permitting and marine engineering for proposed pier extension. Secured permits through Miami-Dade County DERM, FDEP, and the Corps. PPeeaaccoocckk PPaarrkk,, MMiiaammii Environmental permitting, marine engineering design and construction administration for overwater boardwalk replacement. PPoorrsscchhee DDeessiiggnn TToowweerr,, SSuunnnnyy IIsslleess BBeeaacchh FDEP CCCL permitting, Florida Building Code coastal section compliance review, and flood regulation compliance consultations for oceanfront condominium with parking pedestal, innovative car elevator and deep mat foundation. Submitted package for FDEP marine turtle lighting review. PPoorrttMMiiaammii AArrttiiffiicciiaall RReeeeff MMoonniittoorriinngg,, MMiiaammii Conducted scientific diving for post- construction monitoring of artificial reefs associated with Miami Harbor Phase III Federal Channel Expansion dredge in accordance with permit compliance. Produced annual monitoring reports (years 3-5). ResumesCoastal Systems International, Inc. 97 ResumesCoastal Systems International, Inc. TTaayylloorr SScchheeuueerrmmaannnn EEnnvviirroonnmmeennttaall // PPeerrmmiittttiinngg && RReessiilliieennccyy PPrroojjeecctt MMaannaaggeerr EEdduuccaattiioonn Master of Professional Science, Marine Affairs and Policy, University of Miami – Rosenstiel School of Marine and Atmospheric Science, Miami, Florida, 2016 Bachelor of Arts, Marine Affairs and Policy, University of Miami, Coral Gables, Florida, 2015 Bachelor of Arts, Ecosystem Science and Policy, University of Miami, Coral Gables, Florida, 2015 PPrrooffeessssiioonnaall AAffffiilliiaattiioonnss Coral Gables Chamber of Commerce CCeerrttiiffiiccaattiioonnss PADI Open Water Diving Certified, 2017 First Aid and CPR Taylor Scheuermann, with over 4 years of experience, provides various environmental services to public and private clients in her role as Environmental/Permitting and Resiliency Project Manager. Her responsibilities include project strategy coordination among project teams, stakeholders, and regulatory agencies for securing environmental permits. She specifically manages projects involving coastal and environmental permit applications, among other specialized regulatory requirements at the local, county, state, and federal levels. Taylor has an in-depth understanding of the regulations and procedures governing coastal/waterfront construction and has established relationships with key regulatory agency personnel. She has an extensive knowledge of coastal zone management in the U.S. Her areas of focus include coastal and waterfront site development, specifically project feasibility, conceptual design, and permitting strategy. Taylor has studied the physical and economic impacts of sea level rise and tropical storms of increasing intensity in Florida communities. Through an understanding of the budgetary restrictions of local municipalities, Taylor is instrumental in setting strategic thinking with an economic basis to assist municipalities in the prioritization of funding resources. She has proven experience in successfully applying and obtaining grant funding for resilient design projects in South Florida. BBaayysshhoorree PPaarrkk,, MMiiaammii BBeeaacchh Providing site civil engineering and environmental permitting services for proposed 20-acre park comprised of lake, walking trails, boardwalks and promenade. Environmental permits to be processed through Miami-Dade County (RER), FDEP, NPDES, Miami-Dade County Health Department, and City of Miami Beach Public Works. CCooaassttaall IInnuunnddaattiioonn && EEccoonnoommiicc VVuullnneerraabbiilliittyy SSttuuddyy,, BBaall HHaarrbboouurr Assessment of Village’s vulnerability to sea level rise and storm surge. Performing economic impact assessment of the cost of “doing nothing.” Obtained Resiliency Planning Grant from FDEP Resilient Coastlines Program. Held public workshops for Village and residents to obtain feedback regarding stakeholder goals related to coastal resilience in the future. BBaall HHaarrbboouurr CCooaassttaall MMaannaaggeemmeenntt,, BBaall HHaarrbboouurr Provided ongoing coastal management support. Advised Village on resilience measures relative to climate change and sea level rise. Evaluated Village’s current policies and projects. Recommended revisions to the Coastal Element of Village’s Comprehensive Plan to incorporate resilience approaches. Researched grant funding applicable to the various activities associated with the Village’s Coastal Management Program. BBaall HHaarrbboouurr VViillllaaggee PPaarrkk,, BBaall HHaarrbboouurr Environmental permitting and marine engineering design of shoreline associated with waterfront park. Design of docking facilities and baywalk. Procuring environmental permits from Miami-Dade County DERM, FDEP, and the U.S. Army Corps of Engineers. Modifying the FDEP Sovereign Submerged Lands (SSL) Lease to include additional waterfront area for the mooring of a police enforcement vessel. 98 ResumesCoastal Systems International, Inc. TTaayylloorr SScchheeuueerrmmaannnn EEnnvviirroonnmmeennttaall // PPeerrmmiittttiinngg && RReessiilliieennccyy PPrroojjeecctt MMaannaaggeerr EEllyysseeee BBuullkkhheeaadd aanndd VViieewwiinngg PPllaattffoorrmm,, MMiiaammii Environmental permitting for a condominium property along Biscayne Bay. Coordinated with FDEP to obtain a property title determination for the project’s Sovereign Submerged Lands (SSL). Obtained permits for the bulkhead and viewing platform replacement. Coordinated the completion of bond documents to obtain a Class I Construction permit from DERM. FFiisshheerr IIssllaanndd VViissiittoorr’’ss MMaarriinnaa,, MMiiaammii Prepared Resiliency Report used to choose the appropriate replacement dock specifications for marina. Coordinated with FDEP and DERM to obtain a Permit Modification and a Class I Construction permit. Coordinated with FDEP to perform a SSL determination and reapply for an expiring lease. HHaauulloovveerr BBeeaacchh PPaarrkk SSeeaa LLeevveell RRiissee SSttuuddyy,, NNoorrtthh MMiiaammii BBeeaacchh Vulnerability assessment of upland infrastructure, protective shoreline features and docking facility. Storm surge and wave propagation modeling conducted to predict flooding impacts for 25-, 50- and 100-year storm events, both today, with future sea level rise levels and King Tide event impacts. Provided recommendations for reducing flood impacts and refining design to achieve improved resiliency. HHiissttoorriicc DDiissttrriicctt RReessiilliieennccyy && AAddaappttaattiioonn GGuuiiddeelliinneess,, MMiiaammii BBeeaacchh Developed guidelines and regulations for the renovation, raising, and/or re- purposing of historic structures in low- lying areas of Miami Beach that are vulnerable to ongoing/increasing tidal flooding and long-term impacts of sea level rise. Assessed the various alternatives through an economic analysis of the construction costs associated with each scenario and the level of inundation experienced by each building. JJaaddee SSiiggnnaattuurree,, SSuunnnnyy IIsslleess BBeeaacchh Provided environmental consulting services for 58-story condominium. Coordinated with design team and environmental agencies regarding beach fencing along the property’s edge, exterior lighting, and the installation of a sculpture. NNoorrtthh BBaayy VViillllaaggee BBooaarrddwwaallkk,, NNoorrtthh BBaayy VViillllaaggee Environmental permitting services for a proposed public boardwalk. Prepared environmental permit applications and public workshop materials to obtain public feedback design. RRiicckkeennbbaacckkeerr CCaauusseewwaayy NNoorrtthh HHoobbiiee BBeeaacchh,, MMiiaammii--DDaaddee CCoouunnttyy Design and permitting of 9.4-acre waterfront corridor, including shoreline stabilization, landscaping, invasive species removal with native species restoration, parking improvements, and stormwater management. Secured permits through Miami-Dade DERM, FDEP and the Corps. TTuurrnnbbeerrrryy OOcceeaann CClluubb,, SSuunnnnyy IIsslleess BBeeaacchh Evaluated design and obtained environmental permits for a 52-story condominium tower with a cantilevered deck and swimming pool with off-site placement of approximately 12,000 cubic yards of excavated material onto the nearby beach area from FDEP. Coordinated exterior lighting approval with FWC. WWiilllliiaammss IIssllaanndd MMaarriinnaa,, AAvveennttuurraa Designed, permitted, and oversaw marina improvements, including slip expansion, dock and piling replacement, and utilities. Processed permits through Miami-Dade County DERM, FDEP, Corps, City of Aventura Building Department, and Miami-Dade County Environmental Review. 99 Previous Experience Miccosukee Golf & Country Club RenovationsMiami, FL FIRM’S RESPONSIBILITIESArchitectural DesignPermittingBid Coduments KEY PERSONNELBruno-Elias Ramos, AIA, GC, LEED APAdrian Price, RA, NCARB EXPECTED COMPLETION DATEDecember 2020 ESTIMATED COST ENTIRE PROJECT$200,000 ESTIMATED CONSTRUCTION COST $5 mil OWNER’S NAME & ADDRESSThe Miccosukee TribeMiccosukee Golf & Country ClubMr. Eric Weiss6401 Kendale Lakes Dr, Miami, FL 33183Ph: 305.382.3930e-mail: ericw@miccosukeegolf.com Following the submissions of a preliminary design proposal, BEA was awarded the opportunity to provide Architectural Design Services for the Miccosukee Golf and Country Club. Working closely with feedback and necessities from the Miccosukee Tribe Council members, BEA is currently making improvements and renovations to the existing Banquet Hall and Club House located in Miami, FL. With the purpose of creating a modern appeal for the Banquet Hall, BEA has provided construction drawings for all new finishes, windows, and façade upgrades, along with an entirely new gable roof design featuring central structural truss system. With the new interior design, the Banquet Hall will have more to host space for multiple events at the same time. The renovations of the Clubhouse also include designing a modern appeal to the building by renovating and re-purposing the existing roof structure and exterior walls, while applying new façade and envelope systems. The new design will include amenities of continuing customers, such as a new Pro Shop, fitness center and locker rooms. The exterior design will feature the introduction of golf cart housing with a canopy to provide shelter for existing driving range positions, as well as two private driving positions for instruction lessons. Connecting the two buildings, BEA has also provided designs and construction drawings to replace the existing covered walkway with a plaza that will feature a new, modern drop off and canopy, anchored by a central fountain feature its design is inspired by the emblem of the Miccosukee Tribe. Through these renovations, the Miccosukee Tribe emphasizes on creating a more welcoming guest and customer experience. BEA anticipates a completion date of December 2020. 100 FIRM’S RESPONSIBILITIESPre-DesignEngineeringConstruction DocumentsConstruction Administration KEY PERSONNELBruno E. Ramos, AIA, GC, LEED APAdrian Price, RA, NCARB EXPECTED COMPLETION DATESeptember 2020 ESTIMATED COST ENTIRE PROJECT$41,000 WORK FOR WHICH FIRM WAS RESPONSIBLE$41,000 OWNER’S NAME & ADDRESSMonroe County Public Works & Engineering1100 Simonton Street, Suite 2-216Key West FL, 33040Mr. Steven SandersProject Manager305.295.4338sanders-steven@monroecounty-fl.gov Long Key Transfer Station RepairsMonroe County, FL As part of the Professional Architectural and Engineering Continuing Services Contract, BEA Architects engaged in a new Task Order for Architectural and Engineering Services to prepare Bid and Permit Documents for repairs at the Layton Transfer Station, Long Key, FL. BEA is providing complete architectural and engineering services, including Pre-Design, Construction Documents, Bidding, Permitting and Construction Administration. The project will consist of preparing demolition documents for the removal of damaged structures to be replaced, the repair of existing open metal framed structures, including damaged siding and roofind panels, as well as the installation of a new concrete electrical utility pole to replaced the damaged pole and to relocate all existing service gear. BEA will also replace the vertical siding and roof structure with similar material to provide the facility with a lasting covering that will stand damages of hurricanes and tropical storms. BEA will also ensure to repair all cracks and fractures in concrete separation walls at the storage bays and will provide record drawings for as-built conditions. The project has an estimated design period of 14 weeks and an estimated construction period of 6 weeks. Previous Experience 101 MoCA Courtyard ImprovementsNorth Miami, FL FIRM’S RESPONSIBILITIESProject DesignConstruction Administration KEY PERSONNELBruno-Elias Ramos, AIA, GC, LEED APArmando Trujillo, RA, LEED AP BD+C EXPECTED COMPLETION DATE2021 ESTIMATED COST ENTIRE PROJECT$55,000 OWNER’S NAME & ADDRESSCity of North MiamiJeff Geimer1855 NE 142 StreetNorth Miami, FL 33181e-mail: jgeimer@northmiamifl.govPh: 305.893.6511 ext 14004 BEA Architects is currently performing courtyard renovations to the Museum of Contemporary Art in North Miami, FL. The design includes a seamless composition of white modular seating within a newly designed exterior courtyard space that will adapt to different events and gallery exhibits. Some of the improvements include the select demolition, the removal and replacement of the existing canopy fabric to install a removable turnbuckle canopy system, which will compliment the overall alchemy of the space and exterior flow, by allowing natural light to enter while still protecting visitors and art installations. This movable shading structure is mold resistant, self-cleaning, and reduces the heat while letting the breeze circulate through. It also helps to uplift the design of the museum because it can be modified to compliment the forever changing aspect of the exhibitions. BEA is also doing the installation of a new trench drain along with a storm-water drainage system and the removal of the existing paver system for a new permeable paver system. The lighting fixtures are being replaced to praise the galleries. New landscaping is added to the museum to improve the experience of the guests, by including modular, portable planters that will reinvent the courtyard’s façade year-round with lush palms. The façade and exterior walls are also being painted and renovated. Museum’s guest will be able to enjoy the magnificent art accompanied with the tropical feel that Miami has. Previous Experience 102 The North Shore Tennis Center ImprovementsMiami Beach, FL FIRM’S RESPONSIBILITIESProject DesignPermittingCost EstimateConstruction Administration KEY PERSONNELBruno-Elias Ramos, AIA, GC, LEED APArmando Trujillo, RA, LEED AP BD+C COMPLETION DATEJanuary 2019 ESTIMATED COST ENTIRE PROJECT$403,000 OWNER’S NAME & ADDRESSCity of Miami BeachPilar Caurin Tortajada1700 Convention Center Drive,Miami Beach, FL 33139e-mail: MariaCaurin@miamibeachfl.govPh: 305.673.7071 ext 6954Fax: 305.673.7073 The City of Miami Beach Tennis Center at North Shore Park is a community sport and recreational facility located in the North Beach neighborhood of Miami Beach, FL. The Tennis Center includes 12 tennis courts and an office/Pro-Shop. As part of BEA Architects Continuing Services Contract with the City of Miami Beach, BEA was assigned to design a fully enclosed, air conditioned modern facility that would serve as the new office and Pro Shop. The original office and Pro-Shop was located within an open air building that featured a breezeway like structure. The project involved the demolition of select areas and enhancements to the existing open air breezeway tennis area. The upgraded office / Pro Shop building has new interior finishes, new lighting, impact resistant windows to protect the facility during the hurricane season in Florida. BEA also integrated a new reception area, offices, conference room, flexible casual seating for parents and visitors, enhanced security and a contemporary retail environment. The project was completed within the City’s budget and time scheduled, and without disruption to the Tennis Center’s ongoing operations. Previous Experience 103 Miami Beach Botanical GardensMiami Beach, FL BEA Architects was selected by the City of Miami Beach Public Works/Property Management Division (PMD), to provide professional architectural services to remove and replace the existing glass doors and windows with impact resistant glass doors and windows at the Miami Beach Botanical Gardens. The Botanical Gardens facility consists of three individual pavilions and one large pavilion, for a total of four pavilion buildings. Based on observations made during BEA’s visit to the site, the existing facility was glazed with non-impact windows and glazed wood doors that required shutters for hurricane protection. Additionally, the existing glass doors and fixed glazed windows did not provide the desired level of envelope integrity and shading coefficient. Based on the results of the Due Diligence and Site Investigations, BEA developed wind load calculations per ASCE 7-10, identified jamb and mullion reinforcement requirements, developed a window schedule and identified suitable window manufacturer’s that can manufacture glazed doors and windows units that conform to BEA’s wind load calculations and comply with Miami Dade County requirements. FIRM’S RESPONSIBILITIESArchitectural ConsultantConstruction DocumentsCode Compliance KEY PERSONNELBruno E. Ramos, AIA, GC, LEED APArmando Trujillo, RA, LEED AP BD+C COMPLETION DATE2015 ESTIMATED COST ENTIRE PROJECT$1.3 million OWNER’S NAME & ADDRESSCAPITAL IMPROVEMENT PROJECTS OFFICE1700 Convention Center DriveMiami Beach, FL 33139Ms. Thais Vieira305.673.7071 ext. 2702thaisvieira@miamibeachfl.gov Previous Experience 104 Miami Beach Bandshell Park Facilities RenovationsMiami Beach, FL BEA Architects was contracted to provide sensitive restoration and rehabilitation services to the City of Miami Beach’s 1961 Norman M. Giller Bandshell Theater in Miami Beach, FL. Restoration and facility upgrades were required for this outdoor performance venue’s historic Miami-Modern Architecture to handle a larger variety of musical genres and performances. BEA’s scope of work included Design, Permitting, Conceptual Drawings, Planning, Cost Estimate, Construction Documents, and Construction Administration. The improvements included structural repairs to the façade, by adding new coats of paint to protect the structure from the saline of the ocean, electrical systems upgrades, ADA (Americans with Disabilities Act) improvements to backstage areas and restrooms, the increasing of acoustical performances, new enhanced sound and lighting systems. The demolition of a bus shelter, reconfiguration and addition of walkways, and an addition of a service driveway were also part of the improvements. BEA also improved the functionality of the loading dock, to transport and install the musical equipment without difficulties. The restorations enhanced the overall user experience for visitors, musicians, and guests to the theater. BEA was responsible of the installation of the “Beatles Mandala”, a mosaic tile artwork by the artists Kevin Arrow. The Beatles Mandala commemorates the 40th anniversary of the arrival of the Beatles to Miami Beach. This work of art consis of a two-hundred SF groung level glass tile mosaic. The design is bright and colorful constructed with thousands of pieces of glass tiles set uopn a concrete base.Thanks to the renovations, the space has been revived to its original splendor. FIRM’S RESPONSIBILITIESArchitectural ConsultantConstruction DocumentsCode ComplianceConstruction Administration KEY PERSONNELBruno-Elias Ramos, AIA, GC, LEED APJohn Colao, AIA, GCAdrian Price, RA, NCARBMario F. Ortega, M.Arch., MSAS COMPLETION DATE2012 ESTIMATED COST ENTIRE PROJECT$935,000 WORK FOR WHICH FIRM WAS RESPONSIBLE$105,000 OWNER’S NAME & ADDRESSCity of Miami BeachCapital Improvements Project Office777 17th Street, Third FloorMiami Beach, FL 33139Ms. Thais Vieira305.673.7000 ext. 2702thaisvieira@miamibeachfl.gov Previous Experience 105 CCoonnttiinnuuiinngg SSeerrvviicceess CCoonnttrraacctt LLiisstt Name of Contract Agency’s Name Work Orders Scope of Work Work Order Amount Professional Architectural and Engineering Services Monroe County BEA was assigned one project for Layton Transfer Station Drawing for Hurricane Irma Building Repairs. Prepare demolition documents for removal of damage structures to be replaced. Repair of existing open metal framed 6950SF storage building, including replacement of damaged siding & roofing panels, coating of existing rigid frame structure. Installation of new concrete electrical utility pole to match existing damaged pole. All electrical service gear to be relocated from existing pole to new pole. Replacement of vertical siding and roof structure with similar material type at (7) existing storage bays. Repair cracks & fractures in (8) concrete separation walls at storage bays. Project close‐out including record drawings for as‐built conditions. $41,297.00 Professional Architectural and Engineering Services in Specialized Categories on an “As-Needed-Basis” City of Miami Beach A&E for Tennis Center Enclose open air space (the entry courtyard) with aluminum and glass storefront; provide glass paired doors at east and west sides. Maintain pedestrian ramp and upper landing on the east side as an exterior condition. Provide air conditioning for newly enclosed space. Provide new general lighting, fire alarms, exit signs, new power/data outlets, other infrastructure to support retail environment. $57,766.00 A&E Services for Historic City Hall for Interior Improvements BEA will conduct limited program verification based on input from the Property Management Department (PMD). BEA will not convene directly with the user groups. BEA will prepare space plans based on programming information provided by PMD. Furnishing lay outs and specifications will be provided by the City’s furnishings contractor. All furnishings will be new. The City’s IT department will address office equipment requirements, including printers, computers, telephone/data, etc. BEA will include one coordination meeting with City’s IT department. $27,600.00 A/E Services for City Hall EVAC Plans BEA will assist CMB in development of an Evacuation Plan of City Hall; this assistance will include meetings and coordination with CMB Fire and Police Departments, CMB Permitting and CMB Administration; deliverable will consist of an Evacuation Plan Report summarizing deliberations with above listed CMB agencies and diagrammatic Evaluation Plan showing City Hall footprint, exit discharges and surrounding areas. $22,224.30 Previous Experience Professional Services Associated with Planning, Design and Engineering Services, Continuing Contract PUR-RFQ-17-3 Canaveral Port Authority Entry Lobby HVAC Improvements and Design – Cruise Terminal 10 100% of Construction Documents, and Construction Administration Services. $35,390.00 Architectural & Engineering Services for Port of Miami Cruise Terminals and Ropax Facilities Miami-Dade County Architectural and Engineering Services CT-V (Formally CT-H) onsite Field Personnel Services Work Order No. 01-BEA Daily field logs, safety reports, photographs, weather information logs, CPM schedule reviews and recommendations, shop drawing reviews, request for change orders, review of application for payments, review of change orders, assistance in negotiations with change orders, review of work installed to assure compliance with construction documents, assistance with building department personnel and additional assistance to Port Miami Personnel for this project as may be required from time to time. $786,486.00 Architectural & Engineering Services WO # 2 CT-V Design Milestones Submittals & Shop Drawing Review Services Work Order No. 02-BEA Services include responding to Design Criteria, related to MEP RFI’s, review of submittals for Architecture, Structural Engineering, MEP Engineering, Fire Protection, Civil Engineering and Landscape Architecture. $379,408.07 106 Previous ExperienceNova Consulting, Inc. Alexander Orr Water Treatment Plant South Miami Heights Site Improvement Miami Dade Water & Sewer Department Owner Miami-Dade Water & Sewer Department Client HDR Engineering, Inc. Client Contact Brenda van Ravenswaay, PE 315 E Robinson St. # 400 Orlando, FL 32801 954-535-1876 brenda.vanravenswaay@hdrinc.com Services Stormwater management Drainage Design Pavement and Grading Design Permitting Engineering Services during Construction Stormwater Management Project Fee $104,368 Start Date February 2019 Completion Date Ongoing Key Personnel Juan C. Prieto, PE, PMP Project Manager Steven S. Eagle, PE Engineer of Record Cynthia Estivil, EI Project Engineer Orlando Alfonso, PE Designer Daymara Otero CAD Operator Luis Dantes Field Engineer The Miami-Dade Water and Sewer Department (WASD) requested engineering services in connection with the relocation of the Division staff from their existing offices at the South District Wastewater Treatment Plant (SDWWTP) to a new trailer complex to be located at the South Miami Heights Water Treatment Plant (SMHWTP) site. This project involves providing engineering design services related to general civil, drainage, electrical site lighting, parking, site striping and overall site plan. Under this scope of work, Nova has been retained to complete the detailed design of the Civil / Site modifications required for the new trailer complex to be located at the South Miami Heights (SMH) site. The civil and site modifications include paving, grading, and drainage design. Nova is responsible for the detailed civil engineering design as well as drainage plans and associated calculations. Deliverables included final civil design drawings and technical specifications to be incorporated into the construction package to be used for the purposes of bidding the project. As Engineer of Record, Nova is also responsible for preparing all permitting forms and documentation and obtaining the required permit approvals for the project, as well as providing engineering services during construction as required, including review of contractor submittals such as shop drawings, change orders, and requests for information, and project final certification. 107 Pump Station Improvement Program (PSIP) Miami-Dade Water and Sewer Department Under the terms of a consent decree, Miami-Dade County is in the process of rehabilitating its wastewater treatment plants and its sewer collection and transmission system. The Pump Station Improvement Program consists of managing the upgrades to Miami-Dade Water and Sewer Department’s Wastewater Collection and Transmission System (WCTS) that includes sanitary sewer collection systems, pump stations, and force mains. As per USEPA standards, all the pump stations will be certified as capable of meeting a nominal average pump operating time of less than 10 hours per day. MDWASD has identified more than 118 sewage pump stations that do not comply with the NAPOT criteria and/or are in need to be upgraded. The cost of the proposed pump station basin improvements and rehabilitations is approximately $215 Million Dollars. There is a total of 153 projects which there are 118 pump stations and 35 force mains. In addition, our team saved the client $37 Million Dollars out of $215 Million Dollars through value engineering. Services Performed As the largest contract awarded to a woman-owned company by Miami-Dade County, Nova Consulting is currently providing the project and construction management for projects being established through the Pump Station Improvement Program. Under the Program, Nova provides the following services: Program Management; Construction Management; Program Controls Management System (PCMS); scheduling, cost estimating; infiltration and inflow (I/I) reduction management; design management; value engineering; permitting; health and safety coordination; municipality/agency coordination; procurement assistance; and public outreach. Project Achievements / Awards • ASCE Miami-Dade Branch “Project of the Year” Award • Ahead of Schedule with 153 projects without incurring an increase to program costs • 73 million in construction has been awarded to date • 80% of PSIP members are Small Business Enterprise firms and 100% local • All established EPA deadlines have been met on or prior to deadlines, thus avoiding fees Capital Projects Planning/ Conceptual Design As part of preliminary engineering services provided to MDWASD, Nova Consulting reviews Remedial Action Plans (RAPs) for each of the 118 Basins that are out of compliance and prepares a reliminary Engineering Report (PER), whicj includes a preliminary cost estimate schedule showing the projected Design, Permitting, Procurement, Construction, and Certification phases of the project. Collections Systems Engineering Nova gathered and amalyzed historical data (up to the last 5 years) to identify current status and operational conditions of each pump station. Data included existing Topographic Surveys, As-Builts, Pump Curves, SCADA Information, SSES previously performed, Gravity Repairs previously performed, Average Daily Run Times (ETs), Force Main installation previously performed, and Wet Well Span Verification. In addition, Field Visit were performed to identify current conditions of the pump station, its structures, and its electrical components. Survey, SUE and Easement Services As part of the analysis and further development of the Remedial Action Plan (RAPs) for each pump station, The PSIP worked with MDWASD to validate the existing pump station property information. In addition, the PSIP coordinated the recording of additional/abandonment of easements, or additional property to be gained by MDWASD. Finally, the PSIP reviewed all topographic and boundary surveys performed the Engineers-of-Record during the design phase. Owner Miami-Dade Water and Sewer Department (WASD) Prime Nova Consulting Client Contact Rolando Roque, PE 3071 SW 38th Avenue Room 55416 Miami, FL 33146 786.552.8129 RoqueR@miamidade.gov Services Program Management Collections Systems Engineering CMOM and I&I Management Construction and Commissioning Project Fee $30,750,000 Start Date June 2014 Completion Date Ongoing Key Personnel Maria J. Molina, PE, ENV SP Principal-in-Charge Steven S. Eagle, PE Design Manager Juan C. Prieto, PE, PMP Sr. Principal Engineer Bryan Moreno, EI Sr. Project Engineer Sergio Baltodano Project Engineer Valeska Colmenares Document Control Engineer Rafael Lazo Construction Field Engineer Carlos Ruiz Construction Field Engineer Luis Dantes Construction Field Engineer Previous ExperienceNova Consulting, Inc. 108 2 Geotechnical The PSIP also managed the Geotechnical Work Orders issued to each project. These services included: development of a Class 1 cost estimate for geotechnical services required, review and acceptance of proposals provided by the geotechnical labs, scheduling of geotechnical services required, review of geotechnical invoices, review of geotechnical lab results, and the formal closeout of each geotechnical work order issued. CMOM and I&I Management Nova developed and managed four (4) Master I/I Contracts. Each contract was county-wide, with individual work orders issued to the awarded contractor specifying the points of I/I repairs. Each contract was specific to one of the following I/I scope-of-work: Sanitary Sewer Evaluation Survey (SSES), Dig and Replace, Manhole Repairs, Cast-in-Place Pipes. Construction and Commissioning Support Services The PSIP monitored and documented on-going construction work via daily inspection reports with hourly description and photographs of work being performed. In addition, the PSIP reviewed and recommended action for all Change Orders and allowance account charges submitted by the Contractors. The PSIP also reviewed all Contractors’ payment request, request-for-information (RFIs), shop drawings, schedules (baseline and progress), and claims. Finally, the PSIP coordinated and oversaw all Pump Station Commissioning and Start-ups. Leak Studies and CCTV A Sanitary Sewer Evaluation Survey (SSES) contract was established by the PSIP. PSIP responsibilities included review of SSES videos and formulation of cost effective repair recommendations. In addition, daily field logs were maintained to document inspections and weekly/monthly SSES reports were prepared for submittal to MDWASD. Regulatory and Intergovernmental As part of the Design Management services, the PSIP closely coordinated with Regulatory and Intergovernmental agencies during all project phases. Monthly meetings with various agencies were held to facilitate the permitting compliance and review process. During the Construction phase, the PSIP assisted awarded Contractors’ with pulling their permits, calling for inspection, and closing their permits during the closeout process. Project Controls The PSIP was responsible for all Cost Control, Estimating, and Scheduling in connection with the projects. These duties included: preparation of budget forecast, preparation of monthly cash flow monitoring reports, preparation of various monthly reports, tracking of projects’ progress, tracking of change orders, and budget oversight of all program elements and resources including; project management cost, land acquisition cost, design cost, permitting cost, and construction cost. The Project Control Team was also responsible for Document Control, essential for the management of documents and information being provided to the PSIP. The PSIP was responsible for the management of the Program’s Database Control System and established its own proprietary Document Management System. The PSIP reviewed, tracked, dated, stamped, filed, and distributed all incoming and outgoing documents. Health and Safety The PSIP would reviewed the following documents prior to the start of construction: (1) Contractor’s Health and Safety Plan, (2) Contractor’s Hurricane Plan, (3) Contractor’s Diving Plan (if applicable). Each plan was reviewed for compliance with Local, State, and Federal OSHA requirements. In addition, on-site field inspectors ensured that proper Personal Protection Equipment (PPE) was always being used by field staff. If a dive plan was necessary, our Diving Specialist would provide supervision on-site to ensure the approved diving plan was followed. Data Analytics and Visualization The PSIP was responsible for developing a Program Controls Management System (PCMS), which consisted of an interactive customized web application that served as a centralized source of information for the PSIP projects. PCMS interfaces with Primavera P6 to provide real-time financial, schedule, resource, progress, and performance information at multiple levels (Program, Project, Project Phase, and Activity). PCMS interfaces with the client’s SharePoint server for access to the PSIP program’s files (documents, photos, videos, etc.) and maintains a log of incoming and outgoing correspondence with links to electronic documents. PCMS features multiple graphical dashboards and reports with real- time and historical data that allows different users - program managers, project managers, and technical support personnel - to monitor trends and make informed decisions. PCMS interfaces with the client’s GIS system and provides mapping of all program related assets as well as graphical program progress status. Previous ExperienceNova Consulting, Inc. 109 Comprehensive Everglades Restoration Plan, Indian River Lagoon South, C-44 Reservoir & STA - USACE / South Florida Water Management District Owner USACE / South Florida Water Management District Client WSP Client Contact Camille Dominguez, PE 7650 Corporate Center Drive Building 10, Suite 300 Miami, FL 33126 561.324.7689 DominguezC@pbworld.com Services Water Resources Ecosystem Restoration Stormwater Management Construction Management Contract Administration Project Controls Project Fee $ 1,164,500 Start Date 2014 Completion Date Ongoing Key Personnel Maria J. Molina, PE, ENV SP Principal in Charge Juan Prieto, PE, PMP Project Manager Rachel Ferradaz, PE Project Controls James Russen Construction Representative Colin Adams Construction Representative Lance McClaskie Construction Representative Ha Nguyen Construction Representative Valeska Colmenares Staff Engineer The Indian River Lagoon is considered the most biologically diverse estuarine system in the continental United States and is home to more than 3,000 species of plants and animals. The C-44 Reservoir and Stormwater Treatment Area (STA) is the first component of the Indian River Lagoon-South project, part of the Comprehensive Everglades Restoration Plan, a joint effort between the U.S. Army Corps of Engineers Jacksonville District and the local sponsor, the South Florida Water Management District. The C-44 project includes the construction of a 3,400-acre reservoir, a pump station with a capacity to pump 1,100 cubic feet per second of water and 6,300 acres of STAs. Nova provided contract administration, construction management, and project controls on the below specific projects. Reservoir Impacted Soils Project: This project consisted of earthwork activities to stockpile 263 acres of residual agricultural chemical (copper) impacted soils within the C-44 Reservoir boundary. The work also included the demolition of an existing irrigation system and monitoring wells, debris removal, the installation of compacted fill in nine (9) acres of the excavated areas, survey tracking of all of the impacted soils, and installation of silt fence around each stockpile. System Discharge Project: This project consisted of the construction of a 120 foot long concrete fixed-crest weir spillway with an integral gated low level discharge structure; a 1,500 foot long canal; and a new South Florida Water Management field office including all of the associated roads, swales, drains, instrumentation, and utilities. Stormwater Treatment Area (STA) Project: This project included the construction of six (6) STA cells and associated canals. These cells include: 32 miles of STA cell berms with shellrock roads; approximately 30 miles of distribution, collection, and drainage canals; 20 gated inlet structures; 20 fixed weir outlet structures; 6 gated outlet structures; 9 box culvert road crossings; 1 fixed crest spillway; installation of power conduits, communication conduits, primary electrical lines, and transformers; repaving of the C-44 access road upon work completion, and all associated roads, swales, drains, and boundary wells. Previous ExperienceNova Consulting, Inc. 110 Previous ExperienceHammond & Associates, Inc. PROJECT DESCRIPTION: The project includes 714,000 square feet and 20-stories of new off ice Space featuring 77 courtrooms with additional space for expansion, an improved ow for visitors and courthouse agency employees, and Improved security screening areas. It accommodates the need for civil and family courts. The conceptual footprint consists of 45 full size courtrooms, 12 smaller courtrooms and 18 hearing rooms for a total of 75 litigation spaces. Below the building is secured parking for approximately 120 judges and department heads. Provided Plumbing, Fire Protection engineering design and Construction Services. This is a Silver LEED Certi ed Building. Construction Cost: $230 Million CLIENT: AECOM CONTACT NAME: Doug McKenzie, AIA 305.444.4691 CONTRACT DURATION: 2014 to 2016 PROJECT RELEVANCY: Plumbing Fire Protection COMPANY ROLE: Sub-Consultant BROWARD COUNTY COURTHOUSE FORT LAUDERDALE, FL 150 NW 70TH AVENUE, SUITE 10, PLANTATION, FL 33317 954.327.7111 www.hammondengineers.com 111 LAUDERHILL SPORT PARK LAUDERHILL LAKES, FL PROJECT DESCRIPTION: This community park is constructed on a 26 acre property. The recreational facility has lighted basketball courts, baseball eld, cricket and soccer elds. The design elements include complete air conditioning services, sanitary and water piping systems for the building and the roof drains, as well as outdoor lighting and site lighting. Hammond & Associates also provided construction administration services for the project. CLIENT: Falkanger Snyer Martineau Architects, Inc CONTACT NAME: Doug Snyder,AIA (954) 764-6575 CONTRACT DURATION: Completed : PROJECT RELEVANCY: Mechanical Electrical Plumbing Fire Protection Construction Administration COMPANY ROLE: Sub-Consultant 150 NW 70TH AVENUE, SUITE 10, PLANTATION, FL 33317 954.327.7111 www.hammondengineers.com Previous ExperienceHammond & Associates, Inc. 112 PROJECT DESCRIPTION: This facility is a three story wrap around structure surrounding the Town Center Parking Garage. The rst level of this 80,000 SF building consists of a pedestrian friendly retail area with an arch covered exterior sidewalk facing City Hall Promenade and the pedestrian/ automobile entrance to the building. The second and third oor houses the City’s Police Department including a sally port entry, holding areas, off ices,conference rooms and investigative facilities. This secure building is designed to be bullet-proof inside and outside and withstand Category 5 hurricanes. CLIENT: Cartaya Architects, Inc. CONTACT NAME: Juan Justiniano 954.776-2724 jJustiniano@cartayaand associates.com CONTRACT DURATION: 2015 to 2017 PROJECT RELEVANCY: Plumbing Fire Protection Construction Administration COMPANY ROLE: Sub-Consultant CITY OF MIRAMAR POLICE DEPARTMENT, CITY OF MIRAMAR, FL 150 NW 70TH AVENUE, SUITE 10, PLANTATION, FL 33317 954.327.7111 www.hammondengineers.com Previous ExperienceHammond & Associates, Inc. 113 PROJECT DESCRIPTION: This 10,000 SF facility includes a two-bay apparatus room for a ladder and rescue trucks, a medical exam/watch off ice, two business off ices, equipment bunker storage, medical storage, decontamination room and a multi-purpose room for department or community use complete with restroom facilities. The site also includes a training tower for live drills. Living amenities within the two-story building include private dormitory facilities, full-service kitchen with commercial range and hood, dining facility, day room with reclining theater seats, covered exterior patio, laundry, and tness facility. Sustainable building design and construction practices were planned into the building and site design to attain Florida Green Building Coalition Certi cation. FORT LAUDERDALE FIRE STATION NO. 54 BROWARD COUNTY, FL CLIENT: PGAL, Inc. CONTACT: Sean Harman, PGAL, Inc. 561.988.4002 OWNER: Broward County SCOPE OF WORK: Mechanical Electrical Plumbing & Fire Protection COMPANY ROLE: Sub-Consultant PROJECT DATES: Completed 2018 Completed According to Contract 150 NW 70TH AVENUE, SUITE 10, PLANTATION, FL 33317 954.327.7111 www.hammondengineers.com Previous ExperienceHammond & Associates, Inc. 114 PROJECT DESCRIPTION: The design features the Moorish architecture unique to the City of Opa-Locka. The building contains a community hall, meeting rooms, and administrative off ices, and will also double as an emergency shelter for the community. The construction used solid concrete tilt- wall construction with uniquely shaped impact windows, form liners, and vivid colors that re ect the Moorish architectural style. Hammond & Associates, Inc. provided Mechanical, Electrical, Plumbing, & Fire Protection FEATURES INCLUDE: • 6,000-square-foot, two-story community center • Community hall, meeting rooms, and administrative off ices • Full security, including magnetic locks and 24/7 video surveillance HELEN MILLER COMMUNITY CENTER OPA‐LOCKA, FLORIDA CLIENT: PGAL, Inc. CONTACT NAME: Kari Botek kbotek@pgal.com 954.726.3951 CONTRACT DURATION: Completed : 2013 PROJECT RELEVANCY: Mechanical Electrical Plumbing Fire Protection COMPANY ROLE: Sub-Consultant 150 NW 70TH AVENUE, SUITE 10, PLANTATION, FL 33317 954.327.7111 www.hammondengineers.com Previous ExperienceHammond & Associates, Inc. 115 OWNER Miami-Dade Transit OWNER CONTACT Javier Salmon Construction Project Manager III 701 NW 1st Court, Suite 1500 Miami, FL 33136 786.473.4710 CONSTRUCTION COST $1,0 00,000 COMPLETION DATE December 2013 DESCRIPTION Premiere Design Solutions, Inc. (PDS) served as the Construction Project Managers under the Contractor selected to Furnish and Install transit improvements at 72 locations in Miami-Dade County, in the Cities of Homestead, North Miami and Miami Lakes, Bay Harbor Islands, El Portal, Opa-Locka , Florida City, Surfside, North Miami Beach and City of Aventura. These project were Federally Funded and coordinated by the Miami-Dade Transit Department. PDS is the main contact for all communications between Contactor, County, City and Federal Agencies in this contract. Project includes the ADA accessibility improvements to bus stop locations, new bus shelters and amenities, new sidewalk and reinforced concrete pads, the relocation of existing bus shelters and permitting activities. The PDS professional staff has been tasked with the permitting through the 10 municipalities involved in this project, coordination with Miami-Dade Transit and the shelter manufacturer for the approval of shop drawings and resolution of field related issues. PDS also developed incidental engineering design plans and the construction schedule, providing monthly updates. Thanks to the vast Transit Improvements experience brought by PDS, these projects have been able to be completed within the strict time frame dictated by owner and Federal Agencies funding this project. Premiere Design Solution’s Duties in the project are: Conduct Pre-Construction visits to identify field problems early on. Obtain permits through Municipalities and Miami-Dade County. Develop and Update Construction Schedule Perform periodic field visits to check progress of construction. Prepare monthly payment requisition packages, including updated project schedule, progress photographs, and related documentation as required for Federally Funded Projects. Prepare Change Notice and Request for Information Documents and negotiate resolution Testing coordination and monitoring Safety and Quality Control during Construction. Incidental Engineering Drawings to obtain necessary permits Liaison between Municipalities, County and Contractor on any aspect related to this project. Miami-Dade Transit ARRA Municipalities Group A&C- Transit Improvements 10 Different Municipalities, Florida Previous ExperiencePremiere Design Solutions, Inc. 116 OWNER City of Miami Gardens CLIENT CONTACT City of Miami Gardens Jimmie Allen Capital Improvement Projects Division City of Miami Gardens 18605 NW 27th Avenue Miami Gardens, FL 33056 305-622-8000, Ext-2802 DESIGN COST $5,200 COMPLETION DATE July 2018 DESCRIPTION Premiere Design Solutions, Inc. (PDS) provided Professional Land Surveying services for a portion of the Arch Diocese Site located in the City of Miami Gardens, Florida at 18330 NW 12th Avenue. The overall project site was bound by NW 12th Ave to the East, The Florida Turnpike to the West, NW 186th Street to the North and NW 183rd Street to the South. The focus area of this work proposal was about 7.4 Acres and has an irregular triangular shape and falls within the overall project site, represented in the image above in red. The overall project site was composed of 4 parcels identified by Folio Nos. 34-2102-000- 0110, 34-2102-000-0040, 34-2102-000-0042, and 34-2102-000-0041. The work area included undeveloped land with heavy vegetated areas. Premiere Design Solution’s role in the project is: Boundary Survey including boundary demarcations Legal description Relevant topographic features Delineation of existing property lines Plat information including recorded easements Arch Diocese Site – 18330 NW 12th Avenue City of Miami Gardens, Florida Previous ExperiencePremiere Design Solutions, Inc. 117 OWNER City of Opa-Locka CLIENT CONTACT EAC Consulting, Inc. Carlos Gonzalez City of Opa-Locka Project Manager 12950 NW 42nd Avenue Opa-Locka, FL 33054 305-206-0279 CONSTRUCTION COST $15,000,000 COMPLETION DATE July 2016 DESCRIPTION Premiere Design Solutions, Inc. (PDS) serves as the Design Criteria Package Topographic Surveyor for the City of Opa-Locka and their Capital Improvement Plan, to bring water, wastewater and stormwater improvements throughout the City. Survey work included the collection of all above ground features, topographic elevation cross sections, research and placement of monument, Right of Way, Easement and Center Lines, draft plats, and generate layered assets in AutoCAD software to represent field data collected. This project includes the topographic route surveys for over 200,000 LF of roadway to receive water and sewer improvements as part of the Capital Improvements Program (CIP) throughout the City of Opa- Locka, and requires PDS to complete all surveys with a very aggressive schedule, in order to meet scheduled deadlines and limited funding. To meet the aggressive schedule, our crews utilize state of the art, and the latest model of GPS rover and Data Collectors available in the market, to deliver high quality data at high production speeds. Premiere Design Solution’s role in the project is: Plat research and drafting for ROW verification. Field Data Collection with GPS units Open all Manholes and Catch Basins to provide client with invert pipe information Cross sectional elevations from ROW to ROW of roadway to generate topographic cross sections Prepare key map and citywide survey drawings Obtain topographic data of horizontal and vertical location of all above ground features Identified easements available in county property records Coordination between City, Engineering Consultant and Survey Field Crews City of Opa-Locka CIP Citywide Topographic Surveys Opa-Locka, Florida Previous ExperiencePremiere Design Solutions, Inc. 118 OWNER City of Opa-Locka CLIENT CONTACT City of Opa-Locka Carlos Gonzalez City of Opa-Locka Project Manager 12950 NW 42nd Avenue Opa-Locka, FL 33054 305-206-0279 CONSTRUCTION COST N/A COMPLETION DATE August 2015 DESCRIPTION Premiere Design Solutions, Inc. (PDS) served as the Consultants for the City of Opa-Locka as Topographic Surveyor, for the development, preparation and drafting of Legal Description and sketches for 11 properties located along Cairo Lane that were encroaching into public right of way. This project was a support service to the City of Opa-Locka in the development of legal easement documentation for future roadway improvements planned within the City to provide drainage and pavement improvements along Cairo Lane from NW 135 Street and the Canal. The project consisted on the drafting of legal descriptions and sketches for easements currently in negotiation between the City and property owners. Project Included one document with legal description and sketch for each of the 11 properties included in the project. The legal descriptions and sketches provided where utilized by the City and were included in their preparation of documents and negotiation of easements. The project was executed expeditiously to meet the aggressive schedule required for the Cairo Lane Roadway improvements project, which included a federal grant that had time constraints. Our crews utilized state of the art, and the latest model of GPS rover and Data Collectors available in the market, to deliver high quality data at high production speeds, and pipe finders to locate property corners. Premiere Design Solution’s role in the project is: Plat research and drafting for ROW verification. Field Data Collection with GPS units Searched property corners for Property Corner markers Prepare key map and Easement survey drawings Identified easements available in county property records Prepared Legal Descriptions Drafted sketches of Proposed Easements Prepared legal description and sketch 3 page documents for each property. Coordination between City, Engin eering Consultant and Survey Field Crews City of Opa-Locka Easements for Cairo Lane (11 Properties) Opa-Locka, Florida Previous ExperiencePremiere Design Solutions, Inc. 119 OWNER Miami-Dade Water & Sewer Department CLIENT CONTACT Carlos Lopez Sr. Project Manager 786.361.1645 WADE TRIM CONSTRUCTION COST $18,000,000 COMPLETION DATE December 2018 DESCRIPTION As part of the Ocean Outfall Legislation (OOL) program, Miami-Dade Water and Sewer Department is undertaking construction of several miles of large-diameter wastewater force mains to redirect wastewater effluent and eliminate ocean outfalls. The projects under Task Order No. 1 are sections of force main that will convey wastewater flow to and from the Southwest Booster Pump Station (SP-1). SL-3A.1 is a 60-inch transmission force main proposed to convey flows from SP-1 to SL-3A.2, which is a pipeline under separate contract that will continue conveyance of flow from SP-1 south. SL-3A.1 has an approximate length of 8,600 linear feet. The proposed transmission main starts at SP-1, extends east along SW 136 Street and then south along SW 137 Avenue before connecting to SL-3A.2 near SW 152 Street and SW 137 Avenue. SL-3B.1 is a 36-inch suction force main proposed to convey sewage from the Country Walk area to SP-1. It has an approximate length of 7,500 linear feet. The force main begins near SW 152 Street and 137 Avenue where it will connect to two existing 16-inch force mains and one 20-inch force main, extends north along SW 137 Avenue, then west along SW 136 Street before connecting to the suction side of SP-1. The start point for this force main is approximate. CONSULTANT will coordinate with the designer of SP-1 and SL-3B (Jacobs Engineering). The connection to SP-1 shall be defined and provided with the required isolation valves to allow for shutdowns during maintenance or repairs Premiere Design Solutions Staff’s Task in the project was: Field Investigation and Land Surveying. Provide Design and Technical advisory services during the design of SL-3A1/3B.1. Provide QA/QC on the engineering and survey during the project for phases 3.1 thru 3.7. Provide water and sewer design engineering assistance to prepare design documents and specifications. Assist in obtaining project related permits. Topographic ROW Surveys for Design for 60-inch & 36 inch FM along SW137 Ave Miami-Dade Water & Sewer Department Previous ExperiencePremiere Design Solutions, Inc. 120 OWNER Oleta Partners LLC CLIENT CONTACT Oleta Patners, LLC Darryl Lee, P.E., LEED AP Development Project Manager 15045 Biscayne Boulevard North Miami, FL 33181 305-442-6531 CONSTRUCTION COST N/A COMPLETION DATE February 2013 DESCRIPTION Premiere Design Solutions, Inc. (PDS) served as the Surveyor and Engineering Consulting firm for this project which included the filed data collection, computer drafting, digital terrain modeling (DTM), topographic survey, volume calculations and report preparation including cross sections of crushed concrete stock piles. PDS was contracted to determine the volume of crushed concrete material stockpiled at the Biscayne Landings construction site. The developer has hired a contractor tasked with crushing and stockpiling crushed concrete for future fill operations on site. PDS coordinated in-house survey crew to obtain horizontal and vertical data of the location and elevation of the stockpiled material. With the information of the points collected in the field utilizing cross sections no longer than 25’, information was migrated into AutoCAD Civil 3D to generate a Digital Terrain Model (DTM) with the information collected from the field, generating surfaces for the existing ground and for the surface area of each of the five stock pile mounds located at the construction site. The DTM was used to determine the volume between the two surfaces, and to generate cross sections of the stock piles at constant intervals. A topographic survey was completed, incorporating the data collected in the field and data from the site survey and a plan view drawing was generated. A volume calculation report was created with plan view, cross sections and volume calculation data. Findings from our volume determination were used to determine payment quantities and to determine production rate adequacy by the owner. It was found that the Volume stock piled was considerably less than expected, so production of crushed concrete will have to increase to reach projected targets. Our services saved allowed our client to perform this task on budget and on schedule. This p roject was completed within the aggressive schedule required by the owner. Premiere Design Solution’s role in the project is: Conduct Field Data Collection and topographic Survey Develop a Digital Terrain Model of existing ground and crushed concrete surfaces Volume Calculations Volume Determination Report Preparation with Cross Sections for each Mound. Biscayne Landing – Swerdlow Group Crushed Concrete Volume Determination North Miami, Florida Previous ExperiencePremiere Design Solutions, Inc. 121 Previous ExperienceUniversal Engineering Sciences, LLC Universal Engineering Sciences | The City of Miami Beach Public Works Department retained UES to perform geotechnical services for the proposed infrastructure improvements. The project includes roadway, drainage, lighting and signalization improvements as well as replacement of a bulkhead wall along the existing canal. Additionally, the geotechnical services include providing design services for a Pump Station at 32nd Street, which included developing engineering recommendations for pump station foundation and excavation support. UES’s scope of services included performing subsurface exploration for design of the bulkhead wall system, perform laboratory soil/rock classification testing, and providing soil/rock parameters for use in bulkhead retaining wall design. The geotechnical field exploration program was a challenge in order to properly secure ROW permits and provide Maintenance of Traffic (MOT) during normal work hours. Indian Creek Drive ROW Infrastructure Improvements Miami Beach, Florida Scope of Services: Field and Laboratory Testing of Construction Materials Owner: City of Miami Beach Public Works Department 305.673.7490 Contact Information: Giancarlo Pena, PE, Civil Engineer I 305.673.7071 GiancarloPena@miamibeachfl. gov Project Manager: Reinaldo Villa, MS, PE Approximate Universal Fee: $42,000 Completion Date: 06/2016 122 The project includes the renovation and expansion of the existing Miami Beach Convention Center with the addition of a two-story ballroom and meeting space with parking located on the roof of the north and west addition. Additionally, the project includes the con- struction of a park pavilion just west of Convention Center Drive. The pavilion consist of a concrete structure that incorporates ‘‘umbrellas’’ that make up the roof and exterior shading spaces located in the City of Miami Beach, Florida. Geotechnical Services UES served as Geotechnical Engineer of Record for all construction aspects, which included deep foundations for the structures and ground improvement for roadways with areas with difficult ground. Materials Testing and Inspections UES is currently serving as the materials testing and inspections firm for the City of Miami Beach for the renovation. Services include weld- ing inspections, concrete field and laboratory testing, field and labo- ratory testing, fireproofing inspections, deep foundation inspections, floor flatness testing, pull testing, and general earthwork observations and consulting. The aggressive schedule requires multiple experiences cross-disciplined staff members to meet the demands of the contrac- tor and their subs. Miami Beach Convention Center Renovation, Expansion, and Park Pavilion Miami Beach, Florida Scope of Services: Geotechnical Field Exploration, Sampling, and Laboratory Testing Owner: City of Miami Beach 305.673.7490 Contact Information: Thais Vieira, RA, LEEP AP 305.673.7071 thaisvieira@miamibeachfl.gov Project Manager: Reinaldo Villa, MS, PE Approximate Universal Fee: $1.4 million Completion Date: Ongoing Universal Engineering Sciences | Previous ExperienceUniversal Engineering Sciences, LLC 123 Universal Engineering Sciences | UES served as Special Inspector during construction of the pavilion, playground and seawall restoration portions of the project. Materials testing services included in-place density testing, laboratory com- paction testing, laboratory compressive strength testing of concrete cylinders, field concrete testing, and masonry grout testing. UES also performed Special Inspection of all auger cast-in-place pile foundations supporting the proposed pavilion. UES also performed rebar and sheet pile wall inspection for the proposed bulkhead wall restoration. During construction, UES also monitored vibration activi- ties with seismographs to ensure vibration levels were within tolerable limits. UES coordinated services between West Construction (General Con- tractor for pavilion construction) and Kiewit Infrastruction South Co. (seawall contractor) for materials testing and inspection services on behalf of the City of Miami Beach. Muss Park Pavilion Miami Beach, Florida Scope of Services: Materials, Foundation and Structure Inspection Owner: City of Miami Beach Capital Improvements 305.673.7490 Contact Information: Eric Arencibia, PE Capital Projects Coordinator 305.673.7071, ericarencibia@miamibeachfl. gov Project Manager: Reinaldo Villa, MS, PE Approximate Universal Fee: $15,000 Completion Date: 01/2018 Previous ExperienceUniversal Engineering Sciences, LLC 124 Universal Engineering Sciences | UES provided geotechnical exploration services to assist the design build contractor with their tunnel design in collecting supplemental subsurface soil data. UES is providing construction materials testing laboratory services consisting of: earthwork and concrete testing services in accordance with FDOT standards and protocols, including supplying field and laboratory technicians certified by CTQP. Also, UES is provided laboratory concrete testing services for the precast concrete plant which is casting the precast concrete segments to be used in the tunnel construction. Other laboratory testing services included: modified proctor, grain size analysis; LBR testing; corrosion series tests; organic content; and compressive strength tests on soil- cement used in the construction of the embankments and road base. Port of Miami Access Tunnel Miami-Dade County, Florida Scope of Services: Field and Laboratory Testing of Construction Materials Owner: Bouygues Civil Works Florida 305.613.8945 Contact Information: Louis Brais, Project Director 305.894.1800 l.brais@bouygues-construction. com Project Manager: Peter G. Read, PE Approximate Universal Fee: $3,200,000.00 Completion Date: 2015 Previous ExperienceUniversal Engineering Sciences, LLC 125 Universal Engineering Sciences | UES served as Special Inspector during construction of the two- story, 6,000 square-foot facility for the City of Miami Beach, Florida. Materials testing services included in-place density testing, laboratory compaction testing, laboratory compressive strength testing of concrete cylinders, field concrete testing, and masonry grout testing. UES also performed Special Inspection of all auger cast-in-place pile foundations supporting the proposed building. UES provided oversight during the test pile program, which included compression, tension and lateral load testing. The results of the load test program were used by UES to provide production pile lengths to support the proposed building. UES also provided structural inspection services, which included rebar, masonry, and structural inspection of the proposed building. Property Management Facility Miami Beach, Florida Scope of Services: Materials, Foundation, and Structure Inspection Owner: City of Miami Beach Capital Improvements 305.673.7490 Contact Information: Fernanda Sotelo 305.673.7071 fernandasotelo@miamibeachfl.gov Project Manager: Reinaldo Villa, MS, PE Approximate Universal Fee: $44,000.00 Completion Date: 01/2016 Previous ExperienceUniversal Engineering Sciences, LLC 126 Previous ExperienceCoastal Systems International, Inc. Coastal Systems performed a grant-funded Inundation and Economic Vulnerability study, which assessed the Village of Bal Harbour’s vulnerability to sea level rise and storm surge under various future scenarios. Coastal Systems procured the Resilience Planning Grant from the Florida Department of Environmental Protection’s (FDEP) Florida Resilient Coastlines Program, on behalf of the Village. Coastal Systems held an Introductory Public Workshop to introduce Village residents, officials and stakeholders to the scope of the study. Coastal Systems compiled a Resilience GIS Database, which includes property values, land use, ground elevations, finished floor elevations, and drainage and roadway infrastructure. Coastal Systems conducted Inundation Modeling to determine the flooding risks for the Village associated with rainfall, King Tides, and various interval storms (25-, 50-, and 100-year storms) through 2080, with sea level rise. Coastal Systems analyzed the potential economic impact associated with the inundation scenarios. Coastal Systems annualized the probable damage cost to infrastructure to understand the potential damages to a building in any given year, with sea level rise. The annual maintenance costs of public infrastructure, including roads, utilities, beach/dune system, and parks were projected to understand the future increases in costs due to increasing sea level elevations. Coastal Systems produced a Vulnerability Ratio to project future potential reductions in property value and compared the future potential reductions in property value to the annual operating budget of the Village to project future impacts to the Village revenues. The future maintenance costs of public infrastructure were compared to the annual operating budget of the Village to project future increases in Village expenditures. Coastal Systems concluded the Study with a final Public Workshop to present results and conclusions. IInnuunnddaattiioonn aanndd EEccoonnoommiicc VVuullnneerraabbiilliittyy SSttuuddyy,, BBaall HHaarrbboouurr Coastal Modeling Stormwater Modeling Data Management (GIS) RREELLEEVVAANNTT SSEERRVVIICCEESS:: Resiliency Economics Grant Funding Public Meetings CCLLIIEENNTT:: Bal Harbour Village Mr. John Oldenburg 655 96th Street Bal Harbour, Florida 33154 Tel: (305) 993-7436 Email: joldenburg@balharbourfl.gov PPRROOJJEECCTT SSCCHHEEDDUULLEE:: 2019 - 2020 CCOONNSSTTRRUUCCTTIIOONN CCOOSSTT:: N/A 127 Coastal Systems, along with a multi-disciplinary team led by Shulman & Associates, is working with the City of Miami Beach to develop guidelines and regulations for the renovation, raising, and/or re-purposing of historic structures in low-lying areas of the City that are vulnerable to ongoing and increasing tidal flooding, as well as the long-term impacts of sea level rise. The guidelines to be delivered focus on preserving several historic districts within Miami Beach, protecting the tax base therein, and improving the districts’ resiliency to increased flooding events. Coastal Systems is currently working with the City to provide a Vulnerability Analysis to verify the costs and/or benefits to property owners and to the City, associated with the scenarios recommended within the Guidelines. Coastal Systems produced an annual cost for the improvements associated with the adaptation alternatives for the historic buildings, the annual estimated damage after adaptation, the estimated insurance premiums, and the estimated increase in property value due to the adaptation. The benefits of adaptation scenarios were weighed against the cost of inaction (“cost of doing nothing”), against which future adaptation measures can be compared. Coastal Systems will validate that the recommended scenarios within the Guidelines represent a net benefit to the private property owners, thus creating an incentive for private sector investment into resiliency adaptation HHiissttoorriicc DDiissttrriicctt RReessiilliieennccyy aanndd AAddaappttaattiioonn GGuuiiddeelliinneess,, MMiiaammii BBeeaacchh Coastal Modeling Stormwater Modeling RREELLEEVVAANNTT SSEERRVVIICCEESS:: CCLLIIEENNTT:: Shulman + Associates Ms. Rebecca Stanier-Shulman 100 NE 38 Street Miami, Florida 33137 Tel: (305) 438-0609 Email: rebecca@shulman-design.com PPRROOJJEECCTT SSCCHHEEDDUULLEE:: 2019 - 2019 CCOONNSSTTRRUUCCTTIIOONN CCOOSSTT:: N/A Resilient Design Economic Analysis Previous ExperienceCoastal Systems International, Inc. 128 Coastal Systems was retained by the City to evaluate interim measures for ongoing beach maintenance after completion of the Broward County Segment III Beach Restoration project in 2006. Coastal Systems planned, designed, and permitted the 2011 Hollywood Beach Truck Haul Maintenance Nourishment. In August 2009, Coastal Systems submitted a Joint Coastal Permit application to the Florida Department of Environmental Protection (FDEP) and the U.S. Army Corps of Engineers, and submitted to the Broward County Environmental Protection and Growth Management Department (EPGMD) for the truck haul project. To distribute consulting (soft) and eventual construction (hard) costs, the City partnered with the City of Hallandale Beach to permit a truck haul project along the Hallandale shoreline from R-124 south to R-128 with the placement of 71,500 cy of beach fill from an upland source. The renourishment consisted of beach fill placement along two segments, north and south. The north segment extends approximately 2,380 linear feet, and includes a dune. The south segment extends approximately 5,370 linear feet. The project was constructed between December, 2011 and February, 2012. Based on pre-construction beach profile surveys, construction fill volumes were reduced to avoid impacts to nearshore hardbottom (8,200 cy on the north segment and 61,200 cy at the south segment). Coastal Systems provided construction administration services throughout the construction duration. In addition, physical monitoring was performed by Coastal Systems. A Biological Monitoring Plan (BMP) was developed in coordination with the regulatory and commenting agencies to ensure documentation of any unanticipated impacts associated with the project. The BMP also included monitoring of Acropora colonies to evaluate the effects to the listed species. The Hollywood Beach Renourishment was one of the first projects in the State to be authorized by State Programmatic Biological Opinion (SPBO). The City now has a 10-year beach maintenance permit, which authorizes subsequent beach nourishment "events". In accordance with the permit-required BMP, Coastal Systems conducted the pre-construction biological monitoring of the nearshore hardbottom resources adjacent to the project. Project monitoring included a hardbottom edge and emergent epifauna survey. HHoollllyywwoooodd BBeeaacchh RReennoouurriisshhmmeenntt,, HHoollllyywwoooodd Beach Profile Survey Biological Monitoring Coastal Engineering CCLLIIEENNTT:: City of Hollywood Community Redevelopment Agency Ms. Susan Goldberg 330 N. Federal Highway Hollywood, Florida 33020 Tel: (954) 921-2980 E-mail: sgoldberg@hollywoodfl.org PPRROOJJEECCTT SSCCHHEEDDUULLEE:: 2008 - 2012 CCOONNSSTTRRUUCCTTIIOONN CCOOSSTT:: $2.5M RREELLEEVVAANNTT SSEERRVVIICCEESS:: Environmental Permitting Construction Administration Physical Monitoring Previous ExperienceCoastal Systems International, Inc. 129 Coastal Systems led a multi-disciplinary team in the design of 24 acres of Maurice A. Ferré Park. Maurice A. Ferré Park was planned by the City of Miami as a waterfront revitalization in the heart of downtown on Biscayne Bay. The $11.5M park incorporates a waterfront promenade, Baywalk and plaza. Coastal Systems provided civil engineering and environmental permitting services. The stormwater management system consists of a combination of exfiltration trenches, retention area within the park, and outfalls to the bay. The stormwater system was designed to meet the stringent guidelines for treating stormwater runoff on-site for this waterfront park that is adjacent to the environmentally sensitive Biscayne Bay. An Environmental Resource Permit (ERP) was processed through Miami-Dade County Regulatory and Economic Resources (RER) for the stormwater management system. Coastal Systems also prepared and processed the NPDES and FDOT permits for the project. Potable water and sanitary sewer utility services were also designed for the Park. Service connections were coordinated with Miami-Dade County WASD which included the preparation of documents for the service agreement with the City. Easements for the new water lines, including fire hydrants, were established, and designed. Due to the site’s historical use as the original Port of Miami, contaminated soils were present in the form of petroleum and arsenic. Coastal Systems led the environmental team in preparing a soil management plan to bring the site into compliance and provide a clean and safe environment for the public’s use. The park’s Louis Poulsen light fixtures and Baywalk design are now established as the design standard by the Downtown Development Authority (DDA) for the proposed City Baywalk-Riverwalk to encompass Biscayne Bay and the Miami River. Apart from the upland development, the large vessel mooring facility, located within the existing basin adjacent to the American Airlines Arena, was also designed and permitted by Coastal Systems. MMaauurriiccee AA.. FFeerrrréé PPaarrkk,, MMiiaammii Civil Engineering Stormwater Management Utility Design Construction Administration Bidding Environmental Permitting Soil Management Plan Coordination RREELLEEVVAANNTT SSEERRVVIICCEESS:: CCLLIIEENNTT:: City of Miami Mr. John De Pazos 444 SW 2nd Avenue, 8th Floor Miami, Florida 33130 Tel: (305) 416-1094 Email: jdepazos@miamidade.gov PPRROOJJEECCTT SSCCHHEEDDUULLEE:: 2009 – 2019 CCOONNSSTTRRUUCCTTIIOONN CCOOSSTT:: $11.5M American Society of Civil Engineers – Civil Engineering Project of the Year (2014-2015) Previous ExperienceCoastal Systems International, Inc. 130 Coastal Systems is leading a team of design professionals in the implementation of Maurice Gibb Memorial Park, located at 18th Street and Purdy Avenue. The City of Miami Beach aims to create a one-of-a-kind park, honoring Maurice Gibb of the Bee Gees, while incorporating sustainable and resilient design features. Coastal Systems developed the 2-acre park design while incorporating community feedback through multiple community meetings and workshops. The proposed improvements will include an outlook platform, fishing piers, shade structures, dog park, open sodded area, landscape, and an ADA children's play area designed by Monstrum, a custom playground manufacturer from Denmark. Coastal Systems is also designing a new seawall, planting mangroves and enhancing the artificial reef by adding rip- rap, in order to create a living shoreline and enhance water quality. The overwater deck and handrails will be designed using recycled materials. Coastal Systems is providing the City with master planning, engineering design, environmental permitting, construction cost estimates, bidding/award assistance, and construction administration services. Coastal Systems is also leading the environmental sub-consultant to manage the testing and mitigation of contaminated soil at the site. Environmental permits are being processed through Miami-Dade County DERM, Florida Department of Environmental Protection, National Pollutant Discharge Elimination System (NPDES), U.S. Army Corps of Engineers and the City of Miami Beach. As part of the City’s resiliency and sustainability initiatives, Coastal Systems will consider and provide alternatives to incorporate into the park’s design: • Raising of the seawall to elevation +5.7’ NAVD to provide a continuous flood barrier. • Drainage system design using projected water levels in anticipation of sea level rise. • Soil management plan to replace/cap contaminated soils associated with the historical land use of the site. MMaauurriiccee GGiibbbb MMeemmoorriiaall PPaarrkk,, MMiiaammii BBeeaacchh Surveying Civil Engineering Stormwater Management Environmental Permitting RREELLEEVVAANNTT SSEERRVVIICCEESS:: Structural Design Bidding Construction Administration Public Meetings CCLLIIEENNTT:: City of Miami Beach Ms. Colette Satchell 1700 Convention Center Drive Miami Beach, Florida 33139 Tel: (305) 673-7071 ext.6401 Email: colettesatchell@miamibeachfl.gov PPRROOJJEECCTT SSCCHHEEDDUULLEE:: 2017 – present CCOONNSSTTRRUUCCTTIIOONN CCOOSSTT:: $6M (estimated) Previous ExperienceCoastal Systems International, Inc. TAB 5 Corporate Standing & Authorized Signatory 132 State Certificate State of Florida Department of State I certify from the records of this office that BEA ARCHITECTS,INC.is a corporation organized under the laws of the State of Florida,filed on May 26, 2000. The document number of this corporation is P00000051935. I further certify that said corporation has paid all fees due this office through December 31,2020,that its most recent annual report/uniform business report was filed on January 21,2020,and that its status is active. I further certify that said corporation has not filed Articles of Dissolution. Given under my hand and the Great Seal of the State of Florida at Tallahassee,the Capital,this the Twenty-first day of January, 2020 Tracking Number:7850421211CC To authenticate this certificate,visit the following site,enter this number,and then follow the instructions displayed. https://services.sunbiz.org/Filings/CertificateOfStatus/CertificateAuthentication 133 State Certificate 3075 NW SOUTH RIVER DR. MIAMI,FL 33142 Current Principal Place of Business: Current Mailing Address: 3075 NW SOUTH RIVER DR. MIAMI,FL 33142 US Entity Name:BEA ARCHITECTS, INC. DOCUMENT#P00000051935 FEI Number: 65-1020158 Certificate of Status Desired: Name and Address of Current Registered Agent: MERIC, NAZLI DOGA 3075 NW SOUTH RIVER DR. MIAMI,FL 33142 US The above named entity submits this statement for the purpose of changing its registered office or registered agent, or both, in the State of Florida. SIGNATURE: Electronic Signature of Registered Agent Date Officer/Director Detail : I hereby certify that the information indicated on this report or supplemental report is true and accurate and that my electronic signature shall have the same legal effect as if made under oath; that I am an officer or director of the corporation or the receiver or trustee empowered to execute this report as required by Chapter 607, Florida Statutes; and that my name appears above, or on an attachment with all other like empowered. SIGNATURE: Electronic Signature of Signing Officer/Director Detail Date NAZLI DOGA MERIC FILED Jan 21,2020 Secretary of State 7850421211CC BRUNO E. RAMOS DPT 01/21/2020 2020 FLORIDA PROFIT CORPORATION ANNUAL REPORT Yes 01/21/2020 Title DPT Name RAMOS, BRUNO E Address 3075 NW SOUTH RIVER DR. City-State-Zip:MIAMI FL 33142 Title VP Name PRICE , ADRIAN O Address 3075 NW SOUTH RIVER DR. City-State-Zip:MIAMI FL 33142 Title DVPS Name RAMOS, MARITZA F Address 3075 NW SOUTH RIVER DR. City-State-Zip:MIAMI FL 33142 TAB 6 Forms & Attachments 135 City of Sunny Isles Beach |Request for Qualifications No. 20-07-01 33 DD EE LL II VV EE RR TTOO :: City of Sunny Isles Beach City Clerk 18070 Collins Avenue Sunny Isles Beach, FL 33160 REQUEST FOR QUALIFICATIONS SECTION 6 RESPONDENT SUBMITTAL FORMS OPENING: 2:30 P.M. Tuesday, August 11, 2020 NOTE:City of Sunny Isles Beach is exempt from all taxes (Federal, State, and Local). Tax Exemption Certificate furnished upon request. Issued by:Purchasing Agent Genesis Cuevas Date Issued: Wednesday, July 8, 2020 This Qualification Submittal Consists of all required forms, including SF330, Questionnaires, Acknowledgements and Affidavits Submissions are subject to the Terms and Conditions of this Request for Qualifications and the accompanying Submittal. Such other contract provisions, specifications, drawings or other data as are attached or incorporated by reference in the Submittal, will be received at the office of the City Clerk at the address shown above until the above stated time and date, and at that time, publicly opened for furnishing services described in the accompanying Submittal Requirement. RFQ No.20-07-01 Continuing Contract for Professional Services CCNA FF ii rr mm NN aa mm ee ________________________________________________________________________________CC oo mm mm oo dd ii tt yy CC oo dd ee ((ss )):: RR EE TT UU RR NN OO NN EE OO RR II GG II NN AA LL AA NN DD FF OO UU RR CC OO PP II EE SS OO FF QQ UU AA LL II FF II CC AA TTII OO NN SS UU BB MM II TTTTAA LL PP AA GG EE SS AA NN DD AA FF FF II DD AA VV II TTSS FAILURE TO SIGN PAGE 38 OF SECTION 6 QUALIFICATION SUBMITTAL WILL RENDER YOUR SUBMISSION NON-RESPONSIVE BEA Architects, Inc. 541310 Respondent Submittal Form 136 Acknowledgement Form City of Sunny Isles Beach |Request for Qualifications No. 20-07-01 34 6.1 ACKNOWLEDGEMENT FORM NAME OF COMPANY: ___________________________________________ (Name of company submitting RFQ) CHECK CATEGORY (CATEGORIES) YOU ARE APPLYING FOR: 1-ARCHITECTS __ 2-CIVIL ENGINEERS__ 3-ELECTRICAL ENGINEERS___ 4-SURVEYORS AND MAPPING__ 5-LEAK DETECTION STUDIES__ 6-MECHANICAL, HVAC & PLUMBING ENGINEERS___ 7 -GEOTECHNICAL___ 8 –STRUCTURAL ENGINEERS___ 9 –ENVIRONMENTAL ENGINEERS____ 10. CONSTRUCTION ENGINEERING AND INSPECTION (CEI) SERVICES____ BEA Architects, Inc. 137 Required Forms City of Sunny Isles Beach |Request for Qualifications No. 20-07-01 35 REQUIRED FORMS PRIME FIRM Role Name of Individual Assigned to Project Number of Years’ Experience Education, Degree Principle-in-Charge: Project Manager Asst. Project Manager Other Key Member Other Key Member REFERENCES Name Firm Providing Reference Phone #Email Address Bruno-Elias Ramos 35 Master of Architecture, University of Florida Armando Trujillo 35 Bachelor of Architecture, University of Houston John Colao 35 Bachelor of Architecture (Honors), University of Miami Adrian Price 13 Master of Architecture, Florida International University; Bachelor of Arts of Architectural Studies (Honors), University of Technology Caribbean School of Architecture (Jamaica) Robert Draper 20 Bachelor of Architectural Design, Florida International University Jeff Geimer City of North Miami (305) 893-6511 ext. 14004 jgeimer@northmiamifl.gov Pilar Caurin Tortajada City of Miami Beach (305) 673-7071 ext. 6954 mariacaurin@miamibeachfl.gov Eric Weiss Miccosukee Golf & Country Club (305) 382-3930 ericw@miccosukeegolf.com Adrian Morales City of Miami Beach (305) 673-7000 ext. 22932 adrianmorales@miamibeachfl.gov Vivian Alfonso Miami-Dade County, PortMiami (305) 347-5520 alfonsv@miamidade.gov 138 Acknowledgement of Addenda 139 Respondent Submittal Form City of Sunny Isles Beach |Request for Qualifications No. 20-07-01 37 RESPONDENT SUBMITTAL FORM RFQ 20-07-01 Continuing Professional Consulting Services (CCNA) The undersigned Firm proposes and agrees, if this submission is accepted, to enter into an agreement with the City of Sunny Isles Beach to perform and furnish all Services as specified or indicated in the Contract Documents. The Firm accepts all of the terms and conditions of this Request for Qualifications. This Bid will remain subject to acceptance for 90 days after the day of Bid opening. The Firms agrees to sign and submit the Agreement and other documents as required by the Bidding Requirements within ten days after the date of the City’s Notice of Award. In submitting this response, the Firm represents, as more fully set forth in the Agreement, that: The Firm has familiarized himself/herself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Law and Regulations that in any manner may affect cost, progress, performance, or furnishing of the Work. The Firm has studied carefully all reports and drawings of subsurface conditions and drawings of physical conditions. The Firm has given the City written notice of all conflicts, errors, discrepancies that it has discovered in the Contract Documents and the written resolution thereof by City is acceptable to the Firm. This solicitation is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation; the Firm has not directly or indirectly induced or solicited any other Firms to submit a false or sham Bid; the Firm has not solicited or induced any person, firm or corporation to refrain from Bidding; and Firm has not sought by collusion to obtain for itself any advantage over any other Firms or over the City. The City and the successful Firm will establish completion times for the services described in this Request for Qualifications and the successful Firm agrees that the services will be completed within the time frames agreed upon and stipulated in the individual Notice to Proceed. 140 Respondent Submittal Form 141 Non-Collusion Affidavit 142 Public Entity Crimes 143 Public Entity Crimes 144 Equal Opportunity / Affirmative Action 145 Conflict of Interest 146 Dispute Disclosure 147 Anti-Kickback 148 Contractor Anti-Boycott Certification 149 Addenda 1 ADDENDUM # 1 DATE: Friday, July 17, 2020 TO: ALL PLANHOLDERS FROM: Purchasing Administrator BID NO.: RFQ 20-07-01 Continuing Professional Consulting Services (CCNA) SUBJECT: Addendum No. 1 BID SUBMITTAL DEADLINE: Tuesday, August 11, 2020 at 2:30 PM Please attach this addendum to the documents in your possession and include the Acknowledgement of Addenda form with your response incorporated with the Request for Qualifications. Revisions: (Note: Deletions will be indicated by strikethrough, additions will be indicated with bold font): Q1.We do not have an architecture license, but do have a landscape architecture license and would like to submit for landscape architecture services. Please confirm that a registered Landscape Architecture firm can submit under Category 1—Architects. A1.The City is currently not soliciting for landscape architecture services under this continuing RFQ. Q2. Is LEED accreditation required if the respondent has and includes their professional license or is LEED accreditation required in addition to license? A2.LEED accreditation would be in addition to professional license. Q3. Re: SECTION 1: INSTRUCTIONS TO RESPONDENTS / GENERAL TERMS AND CONDITIONS, 1.24 CERTIFICATE (S) OF INSURANCE: “At the time of Firms submission the Firm must submit certificates of insurance as outlined in the General Conditions section. All required insurances shall name the City of Sunny Isles Beach as additional insured and such insurance shall be issued by companies authorized to issue insurance in the State of Florida.” Do certificates naming the City as an additional insured need to be submitted with the RFQ response or are specimen certificates evidencing proof of coverage acceptable, provided the required certificates are submitted in the event of contract award? A3.Evidence of proof of coverage is acceptable at the time of submittal however, upon contract award the COI must have the City listed as an additional insured. Q4.Section 2.6.1 LICENSING REQUIREMENTS: “At a minimum, Respondents must have at least one (1) team member accredited in the United States Green Building Council Leadership in Energy and Environmental Design (LEED).” Is Envision Sustainability Professional (ENV SP) certification acceptable as a substitute? As civil engineers, this certification is more applicable to our potential scopes of work than LEED. A4.Yes for engineering disciplines. Q5.Section 5.0 FORMAT: E. Qualification Information and Assigned Personnel requests submission of “Form SF330, include Part I and Part II” and F. Firm References and Similar Work Completed requests submission of Qualification Statement, resumes for proposed 150 Addenda 2 personnel, project experience, organizational chart, etc. As these items are included in the SF 330, does the City want the information repeated in both sections? A5.Firms may submit the SF 330 in lieu of resumes. Q6. Section 5.0 FORMAT, F. Firm References and Similar Work Completed, “The title and a brief description of each project and/or service shall include:… Item e. -Past 5 years copies of executed agreements made between your firm and local municipalities, with a scope similar to this RFQ.If sub-consultants are a part of the proposed work plan, include items A through E for each firm, including an organizational chart showing the relationship between the responding firm and the sub firm(s).” Does the City want executed agreements included for each project submitted as relevant experience, for each firm (prime and subs)? They are generally lengthy. A6.Due to the length of these agreements, if your firm has an active contract/PO within the past 5 years with local municipalities please state the agency’s name, project scope and contract amount in lieu of attaching the contract(s). Q7. Does the City want copies of professional licenses included in Section E. Qualification Information and Assigned Personnel or Section H. Forms and Attachments? A7.Section E. Q8. Pg. 12 of the above referenced RFQ states on page 12 (see attached) that at least 1 Team member must be LEED Accredited. However we are a Structural Engineering Firm and as such LEED is not applicable to our services. Therefore no one on our staff Is LEED Accredited. Please advise if this precludes our firm from submitting for this solicitation. Thank you. A8.No, LEED would apply to architectural prime consultants. Q9. We are an environmental consulting firm interested in pursuing the subject RFQ for the “Environmental Engineering” discipline. However, Section 2.6.1 of the RFQ appears to eliminate us from eligibility and so I’m writing for some clarification. We are not an engineering, architecture, or landscape architecture firm. Our services are not regulated by the Florida Department of Business and Professional Regulation and so we could not meet the requirements of the last bullet of section 2.6.1, although we are properly registered and in compliance with the State of Florida (Division of Corporations). Is it the City’s intent for the “Environmental Engineering” discipline to only be serviced by licensed engineering firms? I recognize the scope could be interpreted to focus on Phase I/Phase II Environmental Assessments, in which case we would not be qualified. But the broad description of “monitoring and mitigation, environmental studies and reports” and the permitting scope are commonly used to describe our work, albeit associated with wetlands, protected wildlife species, and water quality. I wanted to be sure this wasn’t an opportunity we were missing due to a technicality the City didn’t intend. A9.Environmental firms must comply with the requirements set forth in Section 2.6.1. of the RFQ, including that they be registered and in compliance with the State of Florida in addition to being licensed and registered with the Department of Business and Professional Regulation to practice in their profession in the State of Florida. 151 Addenda 3 Q10. We are pursuing the Civil Engineering Category. Civil engineering projects may require geotechnical, survey, environmental, and/or materials testing services, etc. Does the City want us to submit a team with these potential subconsultants or use the firms selected in those categories under this solicitation if awarded a task order requiring those disciplines? A10.Yes, please submit your list of sub-consultants. Q11.Page 33 of the RFQ asks for Commodity Codes. Does this refer to the categories or does the City want NAICS codes listed on the form? A11.You may leave this section blank. Q12.Does the City require separate submittals for pursuing multiple scopes? A12.No, just make sure to indicate in section 6.1 the categories your firm is applying for. Q13.Can we submit only for the marine structures aspect of the Structural Engineering scope? Or would we have to pursue the entire category, including building structures? A13.You will need to submit for full structural services. Q14.Is it possible to submit under coastal/marine engineering being that that is our area of expertise? A14.Firm may submit under Environmental Engineering category. Q15. In the RFQ on page 1, it states all questions are due on Friday, July 17, 2020 by 5:00 PM.On page 3 it states, “All questions regarding this Request for Qualifications No. 20-07- 01 shall be directed in writing to Mauricio Betancur, CMC, City Clerk, Friday, July 24, 2020.” Can you please clarify if questions are due on July 17, 2020 by 5:00 PM or July 24, 2020? A15.The questions due date is Friday, July 24, 2020. Q16. Landscape Architect is listed under licensing requirements on page 11 -12 of the RFQ, which category should Landscape Architecture submit under? A16.The City is currently not soliciting for landscape architecture services under this continuing RFQ. Q.17 Surveyors and Mapping is listed in the scope of services, on page 11 - 12 it does not state licensing requirements for Surveying. To pursue for Surveyors and Mapping, can you please clarify if the firm and/or individual needs to be licensed? A17.The firm and/or individual needs to be registered in the State of Florida to engage in the practice of surveying and mapping under this contract. Q18. Under 2.6.1 Licensing Requirements, it states that the firm shall possess at minimum one of the following licenses; however, on the list, it also states that "at a minimum, respondents must have at least one LEED certified professional. Do you require all respondents to have a LEED certified professional in the team? 152 Addenda 153 Addenda 1 ADDENDUM # 2 DATE: Tuesday, July 28, 2020 TO: ALL PLANHOLDERS FROM: Purchasing Administrator BID NO.: RFQ 20-07-01 Continuing Professional Consulting Services (CCNA) SUBJECT: Addendum No. 2 BID SUBMITTAL DEADLINE: Tuesday, August 11, 2020 at 2:30 PM Please attach this addendum to the documents in your possession and include the Acknowledgement of Addenda form with your response incorporated with the Request for Qualifications. Revisions: (Note: Deletions will be indicated by strikethrough, additions will be indicated with bold font): Q1.Will there be a pre-bid meeting/conference for this RFQ? A1.No. Q2. Section 2, 2.1 mentions Architectural, Civil Engineering, Electrical Engineering, Structural Engineering among other professional services. Does the city anticipate a need for Mechanical, Plumbing, Fire Protection Engineering? A2.This will be covered under the Architecture category as a sub-consultant to the Prime or within the Architecture Firm. Q3. Does the city know how many firms will be selected for each of the disciplines mentioned in Section 2, 2.1. A3.No, we do not have a minimum or maximum number for firms per category. Q4.Under Section 2.6 – “The successful firm must have a minimum of five (5) years business experience….” Question: Does the five years infer five years as a registered company or LLC, or experience in running a business? A4.The firm must have a minimum of 5 years in their respective discipline. Q5. Under Section 2.6.1 – “….the firm shall possess at minimum one of the following licenses….” State of Florida Surveying and Mapping license is not listed. Question: Was this license omitted from the list in error? A5.The firm and/or individual needs to be registered in the State of Florida to qualify and engage in the practice of surveying and mapping under this contract. 154 Addenda 155 Addenda 156 Addenda 157 Insurance SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. INSURER(S) AFFORDING COVERAGE INSURER F : INSURER E : INSURER D : INSURER C : INSURER B : INSURER A : NAIC # NAME:CONTACT (A/C, No):FAX E-MAILADDRESS: PRODUCER (A/C, No, Ext):PHONE INSURED REVISION NUMBER:CERTIFICATE NUMBER:COVERAGES IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. OTHER: (Per accident) (Ea accident) $ $ N / A SUBRWVDADDLINSD THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. $ $ $ $PROPERTY DAMAGE BODILY INJURY (Per accident) BODILY INJURY (Per person) COMBINED SINGLE LIMIT AUTOS ONLY AUTOSAUTOS ONLY NON-OWNED SCHEDULEDOWNED ANY AUTO AUTOMOBILE LIABILITY Y / N WORKERS COMPENSATION AND EMPLOYERS' LIABILITY OFFICER/MEMBER EXCLUDED?(Mandatory in NH) DESCRIPTION OF OPERATIONS belowIf yes, describe under ANY PROPRIETOR/PARTNER/EXECUTIVE $ $ $ E.L. DISEASE - POLICY LIMIT E.L. DISEASE - EA EMPLOYEE E.L. EACH ACCIDENT EROTH-STATUTEPER LIMITS(MM/DD/YYYY)POLICY EXP(MM/DD/YYYY)POLICY EFFPOLICY NUMBERTYPE OF INSURANCELTRINSR DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) EXCESS LIAB UMBRELLA LIAB $EACH OCCURRENCE $AGGREGATE $ OCCUR CLAIMS-MADE DED RETENTION $ $PRODUCTS - COMP/OP AGG $GENERAL AGGREGATE $PERSONAL & ADV INJURY $MED EXP (Any one person) $EACH OCCURRENCE DAMAGE TO RENTED $PREMISES (Ea occurrence) COMMERCIAL GENERAL LIABILITY CLAIMS-MADE OCCUR GEN'L AGGREGATE LIMIT APPLIES PER: POLICY PRO-JECT LOC CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY) CANCELLATION AUTHORIZED REPRESENTATIVE ACORD 25 (2016/03) © 1988-2015 ACORD CORPORATION. All rights reserved. CERTIFICATE HOLDER The ACORD name and logo are registered marks of ACORD HIREDAUTOS ONLY 8/7/2020 Hall &CompanyA/E Professional Liability Insurance Program LLC1966010thAveNEPoulsboWA98370 Jim Ledbetter 360-626-2019 360-626-2019 jledbetter@hallandcompany.com Argonaut Insurance Company 19801 BEAARCH-01 RLI Insurance Company 13056BEAArchitectsInc3075NWSouthRiverDrMiamiFL33142 The Phoenix Insurance Company 25623 Travelers Property Casualty Company of America 25674 The Travelers Indemnity Company 25658 990390555 C X 1,000,000 X 1,000,000 10,000 1,000,000 2,000,000 X Y Y 6607N66210A 8/26/2019 8/26/2020 2,000,000 C 1,000,000 X X Y Y 6607N66210A 8/26/2019 8/26/2020 D X 4,000,000 X Y CUP7N662854 8/26/2019Y 8/26/2020 4,000,000 X 0 E X Y Y UB7N55984A 8/26/2019 8/26/2020 1,000,000 1,000,000 1,000,000 AB Professional Liab:Claims MadeExcessProfessionalLiability N Y 121AE000161601RDP0037293 8/26/20198/26/2019 8/26/20208/26/2020 $2,000,000 Per Claim$3,000,000 Per Claim $2,000,000 Aggrega$3,000,000 Aggrega The certificate holder is an additional insured per the attached.Policies provide 30 days notice of cancellation to the additional insured City of Sunny Isles Beach18070CollinsAvenueSunnyIslesBeachFL33160