Loading...
HomeMy WebLinkAboutR.J. BEHAR & CO.CITY OF SUNNY ISLES BEACH Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20 -07-01 In Association with: August 18, 2020 Tierra South Florida, Inc. Javier E. Bidot & Associates, PSC, Corp. Underwater Engineering Services, Inc. Submitted by: Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section A Section A. Title Page Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section A – Page | 1 A. Title Page Respondent Name: R.J. Behar & Company, Inc. Address: 6861 SW 196 Avenue, Suite 302 Pembroke Pines, Florida 33332 Telephone: (954) 680-7771 Fax Number: (954) 680-7781 Project Manager: Paola Riveros, PE E-mail: priveros@rjbehar.com Date: August 11, 2020 RFQ No./Title: 20-07-01 Continuing Professional Consulting Services (CCNA) Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section B Section B. Table of Contents Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section B – Page | b – 1 B. Table of Contents Section Page Number A. Title Page ........................................................................................ a-1 B. Table of Contents .......................................................................... b-1 C. Cover Letter and Executive Summary ..................................... c-1-3 1. Minority Business Enterprise (MBE) Certification ...................................... c-4 D. Project Approach and Understanding .................................... d-1-7 E. Qualification Information and Assigned Personnel .................... e-1 1. Qualifications ..................................................................................... e-1 – 11 2. Standard Form 330 ........................................................................... e-12 – 90 3. Availability of Personnel .................................................................. e-91 – 92 4. Firm and Staff Professional Licenses ............................................. e-93 – 108 F. Firm References and Similar Work Completed .......................f-1-18 G. Corporate Standing and Authorized Signatory ......................... g-1 H. Forms and Attachments  Response Submittal Form  Acknowledgement Form  Required Forms  Acknowledgement of Addenda  Respondent Submittal Form  Non-Collusion Affidavit  Public Entity Crimes  Equal Opportunity/Affirmative Action Statement  Conflict of Interest Statement  Dispute Disclosure Form o Supporting Documents/Litigation Statement  Anti-Kickback Affidavit  Contractor Anti-Boycott Certification  Certificate of Insurance (COI) Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section C Section C. Cover Letter and Executive Summary 6861 S.W. 196 Avenue, Suite 302 • Pembroke Pines, Florida, 33332 • Tel: (954) 680-7771 • Fax: (954) 680-7781 August 7, 2020 Ms. Genesis Cuevas, MPA, CPPB City Clerk/Purchasing Agent City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, Florida 33160 RE: Request for Qualifications – RFQ No. 20-07-01, Continuing Contract for Professional Services CCNA Dear Ms. Cuevas: R.J. Behar & Company, Inc. (RJ Behar) is most pleased to submit one original, four copies, and one electronic copy (PDF) on CD for this Request for Qualifications to provide Civil Engineering, Structural Engineering; and Construction Engineering and Inspection (CEI) services to the City of Sunny Isles Beach. We are complementing our team with Tierra South Florida, Inc. (TSF), a Minority Business Enterprise {MBE}, who will provide the geotechnical engineering and testing services, Javier E. Bidot & Associates, P.S.C., Corp., (JEBA), an MBE, who will provide surveying services, and Underwater Inspection Services, Inc. (UESI) who will provide underwater inspection services. We are confident that we can provide the quality professional services you need for successful completion of this contract. We offer 32 members of our professional staff. We currently have 13 Registered Professional Engineers, a Professional Hydrologist and a Board Certified Environmental Engineer specializing in water supply and waste water, a Certified Floodplain Manager, a Certified Environmental Inspector, Engineer Interns, Design Engineers, CAD Designers, Resident Compliance Specialists, Threshold Inspectors and all of our Inspectors are CTQP Certified with the Florida Department of Transportation. Our Principal engineers bring a wealth of expertise as well as over 78 years of combined experience in the engineering field. RJ Behar is a full-service engineering firm offering services in Civil, Sanitary Sewer Design, Water Distribution Systems Design, Stormwater Master Planning, Green Building Design, Site Planning and Engineering Design, Traffic Engineering, Transportation Planning, Roadway/Highway Design, Street Lighting, Engineering Plans Review, Municipal Engineering, Environmental Engineering, Storm Drainage Design, Structural, Construction Engineering and Inspection and Construction Management, Threshold Inspections, Building Code Inspections, and Expert Witness for Eminent Domain Proceedings. We are well-versed in design, engineering, budget, and construction cost estimating services, bidding assistance, permitting, and contract administration services during construction. U NDERSTANDING THE S COPE: We understand the nature of continuing services contracts and have assembled a team who is able to provide a comprehensive list of services and can handle concurrent assignments without compromising the quality and promptness of deliverables. Our organizational chart reflects our complete understanding of the anticipated task assignments and the various disciplines needed to complete those tasks. Our goals for these types of contracts are the following:  Respond quickly to requests for proposals for specific tasks,  Work as an extension of City’s Staff with a service-oriented approach,  Provide sufficient staff to be able to adhere to any schedule required by the City,  Adhere strictly to budgets set by the City, and  Conduct in-house quality control reviews of all deliverables to eliminate potential construction claims or delays. In this type of contract, the most important issue is responsiveness. General Service Contracts are a tool that the City has to undertake projects that sometimes develop unexpectedly (“walk-in projects”) and require expeditious response. Section C – Page |2 This kind of project does not usually fit the workload plans of the in house staff, requiring the use of this tool. They also offer the opportunity to reduce any backlog of work and to provide expertise in specialized areas. Our objective in these contracts is to provide the City with high quality, timely professional services in support of the City’s Mission. We commit ourselves to be an extension of your staff and to “tailor fit” our services to provide specifically what the City desires. Our project manager provides direction and is responsible to the client for the quality and timeliness of the work, whether it is provided by RJ Behar or our specialty subconsultants. RJ Behar’s Team is extremely qualified and experienced to address all the needs and requirements of the scope of work for this continuing services contract due to our extensive experience with municipal work. The entire professional team assembled for this RFQ fully understands the scope and can meet the requirements. We commit all of our resources to accomplish any job, on time and within budget. When undertaking a civil engineering project, we try to incorporate a number of sustainable and innovative designs, while keeping in mind our client’s budget. C OMMITMENT TO P ROVIDE P ERSONALIZED S ERVICE: The RJ Behar Team is committed to meet all budgets, locations, and task work orders that can arise from this contract. Ms. Paola Riveros, PE will serve as the Project Manager and point of contact for this contract. She can be reached at 6861 SW 196th Avenue, Suite 302, Pembroke Pines, Florida 33016, tel: (954) 680-7771, fax: (954) 680-7781, e-mail: priveros@rjbehar.com. Ms. Riveros has over 19 years of engineering experience, including significant experience in the design of municipal projects. Her multifaceted expertise in both engineering and design make her a valuable addition to the project team. Mr. Robert Behar, PE, president, has 45 years of experience in civil, transportation, and structural engineering and he will serve as the Principal in Charge. He can be reached at (954) 680-7771, email: bbehar@rjbehar.com. Mr. Juan H. Vazquez, PE, vice president, has 35 years of experience, will be responsible for all stormwater, sanitary sewer and environmental related projects and he will be responsible for the Quality Control/Quality Assurance. He will also be available to respond and provide personalized services to your projects. He can be reached at (305) 558-3777, e-mail jvazquez@rjbehar.com. We offer an extremely qualified group of individuals whose experience and capabilities are especially suited to the development of the Engineering Consultant Services contracts. We have assembled a team of seasoned professionals with supporting staff members to undertake any assignment that could come up in this Request for Qualifications for Continuing Professional Consulting Services. Our team has successfully completed similar civil engineering contracts for various government and municipal agencies. In addition, RJ Behar has a complete understanding of federal and state regulations related to project funding; we have assisted some of our clients in obtaining federal grants to develop some of their projects. We have personnel who have worked on numerous Federally Funded, LAP, and ARRA projects and they are extremely familiar with the requirements involved with these types of projects. From our project examples listed within the proposal, you will see that RJ Behar’s Staff has extensive experience working on general engineering services contracts for many agencies. C URRENT W ORKLOAD AND S TAFF C APABILITY The table to the right illustrates RJ Behar's current workload and remaining fee under contract. In review of our anticipated spending of work under contract and with our current workforce, we estimate that we will begin to require new contracted work sometime this fall. The illustration shows a steady decline in our contract demands, which has been substantiated by our review of our future work under contract. The predicted fall-off in our backlog is normal for this time of year. However, RJ Behar’s Staff will become more available as we approach fall, which seems to be well-timed for the anticipated needs for this contract. As demonstrated, our team has considerable resources and we do believe that we will be able to meet the challenges of any of the City’s assignments. Our production capability will enable us to perform on this contract in an efficient and expeditious manner. Several of our large production contracts will be completed in the next few months, thus reducing our backlog considerably as illustrated above. We anticipate staff availability of five to seventeen hundred staff hours per month, which can be Section C – Page |3 applied to other contracts. The staff identified in the organization chart will be available to work on this contract immediately. RJ Behar will be able to provide sufficient staff to ensure timely completion of any assignment under this contract. RJ Behar anticipates that as POs become available from this contract, work will be coordinated with our project manager accordingly, so current/ongoing assignments will not be jeopardized and new assignments will be scheduled to follow the required expected process, that way projects already under contract will continue unaffected to their final submittals. A UTHORIZATION AND L ICENSING TO P ROVIDE P ROFESSIONAL E NGINEERING S ERVICES RJ Behar is authorized by the Secretary of State of Florida and licensed by Board of Professional Engineers to provide professional engineering consulting services as well as its professional staff. RJ Behar maintains and ensures that all certifications and licenses are active and in good standing as required by the necessary federal, state, and local laws. Please see copies of professional licenses and certifications under Section E and Section G. F LORIDA S MALL AND M INORITY B USINESS RJ Behar is certified under the provisions of 287 and 295.187, Florida as Minority Business Enterprise. We also included subconsultants who are minority owned firms are as well, Tierra South Florida, Inc. and Javier E Bidot & Associates. Please refer to copies of the team MBE certifications following the Executive Summary document. C OMMITMENT TO Q UALITY C ONTROL/WILLING TO M EET C ITY E XPECTATIONS: RJ Behar has a detailed system of checks and back-checks to ensure that our services, plans, and practices reflect the highest standard of design and engineering principle. Our “we do it right” attitude and the professionalism of the RJ Behar Team will enable us to serve the City better as we will strive to exceed your expectations. RJ Behar has been in business since 1999 and has always maintained the required licenses, certifications, permits to stay in Good Standing to perform our services and will continue you to do so accordingly. As President, I personally will assure the overall successful completion, in terms of quality, timeliness, and budget. For the team, I enthusiastically offer this proposal and look forward to continuing our relationship with the City of Sunny Isles Beach and R.J. Behar & Company, Inc. Sincerely, R. J. BEHAR & COMPANY, INC. Robert J. Behar, P.E. President Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section C – Page | 4 C1. Minority Business Enterprise (MBE) Certification Tierra South Florida, Inc. MBE Certification Period: 10/02/2019 – 10/02/2021 R.J. Behar & Company, Inc. MBE Certification Period: 04/25/2019 to 04/25/2021 Javier E. Bidot & Associates, PSC, Corp. MBE Certification Period: 09/05/2019 – 09/05/2021 Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section D Section D. Project Approach and Understanding Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section D – Page | 1 D. Project Approach and Understanding This proposal describes RJ Behar’s approach to Continuing Engineering Services (task work order) contracts to provide Civil Engineering, Structural Engineering and Construction Engineering and Inspection services. Our firm provides similar services to governments agencies such as: Florida Department of Transportation, South Florida Water Management District, City of Miami, City of Hialeah, City of Coconut Creek, Town of Davie, Miami-Dade County, and Palm Beach County. We have developed procedures and spreadsheets to track and manage the assigned tasks. We provide monthly progress reports of each task with all information and issues that may affect schedules. In order to accomplish these objectives, RJ Behar will: • Assemble a Project Team whose experience specifically matches the services requested in the scope of work. • Adhere to our in-house quality assurance program. • Establish a project schedule, which is to be monitored by the Project Manager. • Maintain strict coordination within our in-house staff, the City’s staff, utility companies, and the permitting agencies. • Identify project issues by scheduling field reviews, a kick-off meeting and begin data collection early in the project. • Maintain a pro-active management philosophy and minimize the City’s involvement throughout the project. Continuing Engineering Services contracts can vary in type, sizes, and scope. We are prepared to be responsive and flexible in meeting the City’s requirements and schedules and commit all of our resources to achieve this goal. For this contract, we have assembled a comprehensive team of experts who will be available to provide any service, from planning and detailed design to construction inspection. Our project approach will be as follows: 1. The Principal-in-Charge is responsible for the overall successful completion, in terms of quality, timeliness, and budget. Mr. Robert J. Behar will serve as Principal-in-Charge. He is the firms’ president and is involved in every company project. 2. Our project manager, Ms. Paola Riveros, PE, is a Professional Engineer registered in the State of Florida with 19 years of experience in these types of projects. The project manager is responsible for the preparation of the scope of services, procedure, staffing, work plan, schedules, estimated fee, and will have direct responsibility of the task completion. 3. As the task/assignment is identified and the City requires our services, the team will be assembled for the specific task. The team will include those disciplines required to the successful completion of the task. 4. Each Task Order shall include: a detailed description of the work to be performed; a schedule of completion (including phases) for the work authorized; and the amount and method of compensation. The Task Orders may contain additional instructions or provisions specific to the authorized work for the purpose of expanding upon certain aspects of the Contract pertinent to the work to be undertaken. 5. After approval from the City of the scope and work plan, RJ Behar will proceed with the project development and preparation of deliverables. 6. Each deliverable will be subject to a comprehensive quality control review in accordance with our Quality Assurance/Quality Control (QA/QC) program. Since the projects that will be assigned under this contract are unknown, our approach is essentially to provide the City with a comprehensive team of experts who will be available to provide any service, from planning and detailed design to construction administration. We are aware of the need to be responsive, cost effective and to provide innovation. Our team will provide the following advantages: • High Qualifications: Team leaders are seasoned professionals with the required qualifications and many years of experience to develop solutions that meet all the project requirements. Our employees are constantly attending continuing education seminars and our project construction inspectors are FDOT certified. Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section D – Page | 2 • Local Knowledge: Our professionals are local and have knowledge of topographical, geological, and environmental conditions. They have expertise in permit requirements and have working relationships with the permit regulators. They are also knowledgeable of local utility companies and their representatives. • Responsiveness: Our contracts are directly supervised by our firm’s principals who understand that repeat business is the key to our success and as such recognize the need to satisfy our clients. • Innovative: RJ Behar has incorporated sustainable designs and planning into our list of services. Our project team includes a group of savvy and experienced designers. They are constantly bringing innovative design solutions to our projects. • Cost effective: Our management approach is tailored to develop designs that are within the scope and within the funding constraints. The main issue to meet this goal is a very good understanding of the scope and what is the product the client is looking for. MANAGEMENT RJ Behar has 13 Professional Engineers and 32 employees available to assist the City of Sunny Isles Beach. Please refer to our team organization chart. During the early stages of project development, RJ Behar will seek to obtain input from the City’s Staff and end users. Regardless of the goals, input during early development will ensure that a quality product is delivered to the City. RJ Behar will also seek to define the cost of all the goals identified and provide the City a preliminary cost estimate to validate programmed funding within the City’s budget process. RJ Behar understands the need to provide accurate cost estimates for the development of capital improvement budgeting. WORK PLAN IMPLEMENTATION The work plans for the various projects and task orders under consideration may vary greatly. RJ Behar believes that a project will be successful if it is well-organized to begin with; people are properly informed as to their responsibilities, schedules, and budgets. Therefore, RJ Behar places a large emphasis upon the initial steps of the project on its first tasks: T ASK 1 – K ICK-OFF M EETING: This task includes a kick-off meeting with all the relevant team members to discuss the scope, work plan, and schedules. It serves to ensure that all team members are in consonance and working towards the same goal. Project coordination will continue with meetings at the major milestones for the project. T ASK 2 – D ATA C OLLECTION: This is an important phase of any project. Information for the planning area and infrastructure data will be gathered and mapped. Of course, the following will be modified appropriately for the specific task order. All information and gathered data will be provided to the City in electronic format. T ASK 3 – F IELD R EVIEWS: RJ Behar will schedule a field review with the City’s Staff, if necessary. These may include the City’s Manager and other City Departments. Discussions will be aimed at reviewing the background of the project and any important issues, problems, or requirements. Other agencies, as deemed appropriate, may be invited. The RJ Behar Team will assess the scope of the proposed improvements. In order to facilitate our team in the scope assessment, we will have a “Project Checklist” available at our field review. We will prepare minutes of the field review to define our scope of work. In the event that the City’s representative is unavailable for the site meeting, RJ Behar will furnish photographs and videos of the project to point out areas of concern. This task may also include a review of the permit agency requirements and preliminary meeting to ensure that the alternatives developed in subsequent phases High Qualifications Cost Effective InnovativeResponsiveness Local Knowledge Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section D – Page | 3 are permissible. Some of this information can either be mapped in AutoCAD or Geographic Information System (GIS) methods, both of which we have expertise in. T ASK 4 – T RAFFIC D ATA C OLLECTION (IF REQUIRED): RJ Behar has in-house technological capabilities for collecting all the necessary traffic data. We have our own traffic counters that can produce volume, speed, and vehicle classification studies. We also own intersection turning movement collection devices and staff trained in its use. All the necessary traffic data will be collected by RJ Behar’s Staff, which will make it a more efficient and economical project component. PROJECT COORDINATION & COMMUNICATION Coordination of a multi-member team requires regular attention. All matters related to the project will be coordinated with the City’s Project Manager. We will try to minimize the City’s day-to-day involvement by keeping the City’s Project Manager informed electronically (e-mail). Ms. Riveros will serve as our focal point of coordination and for providing timely responses and prompt follow up. She will be the link with the project team.  B ETWEEN RJ B EHAR AND THE C ITY OF S UNNY I SLES B EACH: As previously discussed, we will always keep the City’s Project Manager well-informed of all issues and/or concerns. Recognizing that City’s Project Manager may be managing numerous projects at any given time; therefore, we will try to accommodate his/her day-to-day involvement by 1) obtaining needed information ourselves, 2) maximizing electronic information transfer (e-mail), 3) conference calls, and/or 4) prompt meeting minutes. We will schedule progress meetings as often as the City’s Project Manager desires. A progress report will be provided on a monthly basis including required action items and who is to follow up. The City’s Project Manager is the voice for the City and, therefore, we will coordinate with him/her prior to meeting with other entities.  B ETWEEN RJ B EHAR AND U TILITY C OMPANIES/PERMITTING A GENCIES: RJ Behar will develop a distribution list for each utility company and permitting agency. Meeting with the permitting agencies will be held as soon as the concept is developed. Utility contacts will be made as soon as topographic features and right-of-way lines are plotted. Ongoing coordination will be maintained with all of the agencies. It is important to note that we propose to have a kick- off meeting at the beginning of the task with the City’s Project Manager and our key staff. This meeting will ensure that the project gets started on the “right foot.” The scope, work plan, schedules, and understanding of the task should be discussed and any major issues identified up-front.  B ETWEEN RJ B EHAR AND P RIVATE S TAKEHOLDERS: RJ Behar will, through the City, coordinate with the private stakeholders involved. We will organize public meetings, one-on-one meetings, conference calls and prepare presentations. We will make ourselves available to provide the services that the City needs. On all public meetings we will keep minutes or recordings as needed for documentation.  C OMMUNICATION: RJ Behar recognizes the importance of communicating during the course of the project. As such, regular in-house meetings will be held to ensure coordination and quality control. We will provide the City with minutes of meetings within one week after the meeting is held, which will include minutes of meetings with all entities involved.  C OMMUNICATION W ITH O THER C ITY C ONSULTANTS: RJ Behar will also coordinate with the other City Consultants as needed, which may include surveyors and geotechnical engineers. PROJECT SCHEDULING METHODS The Project Manager is the key to a successful project schedule; he/she is the “CEO” for the technical elements related to the project. RJ Behar is completely familiar with the logic involved in scheduling projects. We utilize Microsoft Projects, Primavera, and spreadsheets software for scheduling and managing our projects. Our management methodology is best summarized as follows:  Staffing Plan: Please refer to our team organization chart.  Weekly In-House M eetings: We hold weekly in-house staff meetings with detailed action items to track schedules, budgets, and design activities. Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section D – Page | 4  Monthly Progress Meetings: Our Project Manager will meet with the City’s Project Manager on a monthly basis to review the project’s progress. A monthly progress report will be prepared.  Interactive Team Management Approach: Our project approach will keep the City thoroughly informed of the project. The team approach is the cornerstone of RJ Behar’s method of doing business.  In-House “Brainstorming Session:” Once we have obtained sufficient field data and have completed our field review, our project team will conduct a “brainstorming session,” where the key personnel gather to discuss the project and suggest an optimal solution for the project. The goal is to get the decision makers involved early.  Use of Interactive Approach with the City of Sunny Isles Beach to Accelerate Work: The goal of the interactive approach proposed by our team is to get the decision makers involved in the project from the very start. Major design decisions will be coordinated with City’s Staff through the City’s Project Manager. This timely involvement allows our team to avoid false starts and eliminates significant design changes at the submittals. An example of our weekly meeting spreadsheet is located to the right. This spreadsheet is used to track milestone dates, action items, and staffing requirements. These are inter-related and are monitored in order to ensure schedule control. BUDGET CONTROL RJ Behar is fully aware of the municipal financial constraints and has put several key steps in place to help with reducing costs. We utilize spreadsheets and the sophisticated Ajera Program from DELTEK computer software to keep track of project budgets. Regardless of the budget constraint of any project, RJ Behar has the commitment of completing every contracted project to the satisfaction of the client. We utilize management spreadsheets for control of each project. These are discussed in our weekly meetings. At these meetings, we go over the items that need to be completed; the budget and staff needed to complete each item. Our Company president presides over these meetings to ensure that each project and task are allocated the necessary resources. RJ Behar has an excellent track-record for delivering projects within budget. INNOVATIVE CONCEPTS RJ Behar is constantly using Value Engineering principles to innovate our projects. We have used new technologies, such as directional drilling, 3D Modeling, new stormwater BMPs, pervious pavements, solar powered systems, and other means. We will continue to use these principles for the City of Sunny Isles Beach’s projects. Value engineering is used to solve problems and identify and eliminate unwanted costs, while improving function and quality. The aim is to increase the value of projects, satisfying the project’s performance requirements at the lowest possible cost. In construction, this involves considering the availability of materials, construction methods, transportation issues, site limitations or restrictions, planning and organization, costs, profits and so on. Benefits that can be delivered include a reduction in life cycle costs, improvement in quality, reduction of environmental impacts, and so on. Value engineering should start at project inception where the benefits can be greatest, however the contractor may also have a significant contribution to make as long as the changes required to the contract do not affect the timescales, completion dates or incur additional costs that outweigh the savings they offer. Value engineering is an exercise that involves most of the project team as the project develops. It is about taking a wider view and looking at the selection of materials, plant, equipment and processes to see if a more cost-effective solution exists that will achieve the same project objectives. The key to this is remembering the relationship between cost Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section D – Page | 5 and value – value is function divided by cost. Concentration on the function of the project or product will avoid mere cost cutting. The project manager must take a pro-active role in both giving direction and leadership in the value engineering process, but must also ensure that time and effort is not wasted and does not have a detrimental effect on the progress of the project. RJ Behar encourages sustainable design and the development of innovative, low-impact solutions. For example, we can implement any of the following: executing newly proven best management practices to reduce stormwater runoff; determining the best location for site amenities to encourage community use; utilizing new materials that promote public safety while limiting environmental impacts; and researching methods that can minimize time and effort. This amounts to reducing overall operational and maintenance costs for our Clients. Additionally, we have experienced staff, who understand the relationship between cost, quality, and timeliness. As a result, we can effectively evaluate the advantages and disadvantages of our solutions against environmental factors and determine the best solutions with the least impact for every unique circumstance. Our experience in sustainable design includes the design of the Broward County Department of Environmental Protection Green Laboratory, where we designed the site amenities and evaluated green features such as bio-swales. This was the first green building design for Broward County. We also designed the site, grading with complete specifications for the Hickory Hammock Equestrian Campground for the SFWMD. In this site we designed compost toilets and solar powered lighting. Under the City of Miami Beach Comprehensive Green Building and Energy Conservation Program, the City partnered with Ameresco to identify capital improvements to save energy costs in City facilities. Ameresco is the largest independent Energy Services Provider in North America. The Convention Center Chiller upgrade project proposed to extend the existing chilled water loop at the Convention Center and Jackie Gleason Theater to provide chilled water for City Hall and the new Municipal Parking Garage. This energy conservation measure (ECM) converted the Convention Center cooling plant into a District Cooling Plant. This project shifted inefficient chilled water operations at City Hall and the new Municipal Parking Garage to the modernized plant currently serving the Convention Center. In order to maximize the efficiency of the new District Cooling Plant, the project included the installation of a Chiller Plant Optimization Package to the plant along with a Geothermal Condenser Water System. These combined efficiency improvements to the Convention Center Chiller Plant greatly improved cooling efficiency to the buildings served utilizing chilled water. The total program will save the City an estimated $1.8 million each year in energy costs. RJ Behar designed the Miami Beach Convention Center underground piping, the supply and discharge wells and the Police Station wells. RJ Behar prepared all site plans and permit packages for the supply and injection wells. The design followed the recommendations of a hydrogeologic report that included the construction of a test well on site to determine underground soil and hydrogeologic parameters. RJ Behar was also responsible for all the utility coordination and pipe routing. The project was completed as a design-build project working for Kerney & Associates a contractor under Ameresco. As population continues to grow, so does our understanding of sustainable development. It should be our goal to improve our quality of life while reducing environmental impacts by providing a more planned and sustainable development strategy. Transit and other alternative modes of transportation such as walking or biking, must support these strategies. Miami-Dade County studied their existing land development and transportation infrastructure to meet a more sustainable standard of design. The County developed the Miami-Dade Green Print document, in which one of its goals was to increase integration of transit with pedestrian and bicycle trips as part of the Responsible Land Use and Smart Transportation initiative. As part of this study RJ Behar prepared a generalized bicycle parking guide layout. The layout intended for distribution to Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section D – Page | 6 local governments, property owners and the public. The plan included photos of bicycle rack designs, schematic drawings, list of bicycle rack elements, and placement locations. As the stewards of society’s physical infrastructure, it is incumbent on civil engineers to lead the next shift in sustainable planning, design, and construction. For this reason, RJ Behar has incorporated sustainable designs and planning into our list of services. When undertaking a civil project, we try to incorporate a number of sustainable and innovative designs including the following: 1. Helping the Owner select a site or road orientation that minimizes environmental impacts, 2. Implementing a stormwater management plan that protects receiving stream channels from excessive erosion, reduces the amount of post-development TSS, and prevents the post-development peak discharge rate and quantity from exceeding the predevelopment peak discharge rate and quantity for the 1 and 2-year 24-hour design storms, 3. Incorporating pervious pavement, porous concrete, and efficient hardscapes into the design for improved groundwater recharge and infiltration, 4. Including mass transit options, bicycle facilities, and preferred parking for fuel-efficient vehicles into the site layout to reduce pollution and land development impacts from automobile use, 5. Maximizing open space while still meeting zoning requirements to provide a high ratio of open space to development footprint, 6. Providing options, such as landscaping, protective covers, or the use of paving materials with SRI Indexes great than 29, that help to reduce heat island effects and minimize impacts on microclimates and human and wildlife habitats, 7. Incorporating lighting options that minimize light trespass from the building and site and reduce development impact from lighting on nocturnal environments, 8. Designing the landscape with native or adapted plants to reduce or eliminate irrigation requirements. Where irrigation is required, our designs incorporate high-efficiency equipment and/or climate-based controllers to reduce water consumption, 9. Promoting the use of natural and renewable products into the design to minimize and reduce the use and depletion of finite raw materials and long-cycle renewable materials by replacing them with rapidly renewable materials. There are many possibilities when incorporating sustainable designs into a project, and at RJ Behar we take each project and determine the most efficient and sustainable design possible, while keeping in mind our City’s budget. We are sure to provide our clients with the most up-to-date and relevant information on how to bring their projects to accreditation COST ESTIMATING RJ Behar is experienced in developing and tracking project cost estimates. One of the first tasks is to meet with the City’s Staff to go over the City’s budget for the project. RJ Behar’s Project Manager will be able to assist the City in developing a budget based on the City’s goals for the project and current construction cost trends. The project budget becomes the basis for the project scope and limits. The project construction cost is further refined after the plans have been developed to a “preliminary” stage by developing an estimate of probable cost. Additionally, probable cost estimates are also developed at subsequent phases to ensure compliance with the project budget. Cost estimates are produced in spreadsheet format including unit prices and quantities. The unit prices are based on a data base developed from recent project bids as well as FDOT’s historic prices. RJ Behar is certified by the Florida Department of Transportation (FDOT) to do cost estimates for design and construction projects. We will provide the City with probable cost estimates at three different phases:  Schematic Phase – a very preliminary cost based on early input of the project. The construction budget will be verified based on this estimate.  Design Development Phase – this estimate will be much closer to the final cost estimate and it will be based on 50% plans completion. It is at this phase that we can eliminate or add items to the construction scope of work, and it will be based on the available budget versus projected costs. Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section D – Page | 7  Final Construction Plans – this is the final engineer’s estimate based on the final design. RJ Behar has an excellent track record with our project bids coming within 5% of our final engineer’s estimate. RJ Behar is aware of the budget and time constraints. We will take appropriate action to reallocate resources if the work items fall behind schedule in accordance with the critical path to minimize impact to the overall schedule. We will effectively manage the budget and have developed a logical quality control plan, which we will adhere to the plan throughout the project. We routinely rank 4.0 or above (1-5 ranking) on FDOT evaluations regarding budget and time. DOCUMENT CONTROL Document control is very important. All administrative procedures and legal protections require proper care of documentation. RJ Behar understands matching documentation requirements with any size project. We use a straightforward system for prioritizing, routing, and maintaining the necessary project documentation. Besides memos and meeting minutes, there are contract documents, plans, specifications, operation manuals, survey data and invoicing that will all need to be routed to their proper locations within the City system. RJ Behar has worked with numerous public agencies and municipalities since its inception and is adept at organizing project documentation using the client’s methods, procedures, and formats. We are familiar with most document formats used in engineering documentation and will easily adapt to requirements of the City. QUALITY CONTROL PROCESS RJ Behar will ensure the quality of its product. Mr. Juan Vazquez, PE will be responsible for the quality assurance. An autonomous group of reviewers will be responsible for this activity. The individuals assigned are highly experienced in the tasks they will be reviewing. Committing the appropriate staff to the project is the most important quality assurance measure. Our Quality Control process is very comprehensive and has resulted in the avoidance of claims during construction. A synopsis of our Quality Program is outlined below: QC REVIEWS: These will be separated into three major areas: 1) engineering design review (criteria) 2) plans preparation/cross reference review 3) constructability review. Providing for these will assure the City the quality it is paying for. For this review process, we have developed checklists of items that must be included on each type of project. QC PROCESS: The process starts with the 1) design originator, 2) it is sent to a checker, it goes back to the 3) originator who reviews the markups and determines which comments are to be implemented. 4) The originator and checker meet to discuss the comments and come to an agreement on the implementation of the comments. 5) If they cannot come to an agreement, the Project Manager will then make that determination. 6) Comments are implemented. 7) Plans are back- checked. All these steps require our QC Stamp, dated and initialed by the individual(s) involved. CONSTRUCTABILITY REVIEW: Mr. Nestor Santana, PE will lead our constructability reviews. He has been involved in construction engineering and inspection projects for over 25 years. He will be reviewing the plans from the contractor’s perspective. He will be looking for lack of consistency between plans, specs, utility agreements, and permit agreements. He will ensure that all pay items are accounted for, check for feasibility of the construction sequence and for claims potential. QUALITY ASSURANCE: Mr. Juan Vazquez, PE, RJ Behar’s vice-president, will certify that the quality control reviews were completed prior to all formal submittals. UNDERSTANDING THE CITY’S NEEDS RJ Behar has had the privilege of working with the City of Sunny Isles Beach before and would like to continue our working relationship on this Request for Qualifications for Continuing Professional Consulting Services (CCNA). We have provided a project approach, based on RJ Behar’s management procedures and quality assurance practices, which closely match those required by the City. Based on our approach, we believe we have demonstrated our ability to successfully deliver high quality service throughout this contract. Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section E Section E. Qualification Information and Assigned Personnel Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section E – Page | 1 E1. Qualifications of the Firm Driven by the understanding that there are better ways to do things and the desire to have the autonomy to do them, RJ Behar’s Principals decided to start this new venture that is now over 20 years old. RJ Behar was established in 1999 and is now an award-winning consulting firm, with a very wide range of expertise and qualifications. Our mission was directed to understand our client’s needs, apply the necessary resources to accomplish those needs, while building and maintaining long-term professional relationships with our clients. Since repeat business is the key to our success, as such we recognize the need to satisfy our clients. Our main areas of specialization emanate from the following services: Civil Engineering Environmental and Water Resources Engineering Transportation and Traffic Engineering Structural Engineering Construction Management and Engineering Inspections CIVIL ENGINEERING RJ Behar has extensive experience in civil and site engineering. We have specialized in municipal and public agency clients. We understand the governmental engineering process, the bid process, contract administration and working with city commissions associated with municipal engineering. The key to providing successful municipal engineering service includes: being responsive, adapting to performing under short notice, learning to be an extension to the City’s Staff, understanding of the City’s budgetary constraints, being user friendly, delivering on our promise, working with city council/commission, providing quality products, and being cognizant of budgets and costs. We provide the design of paving; drainage, water distribution systems and sanitary sewer systems associated with land development projects. We are experienced in obtaining permits from the state agencies such as the Water Management Districts, Department of Environmental Protection, the Florida Department of Transportation, Health Department and numerous City and County agencies throughout South Florida. RJ Behar has been involved in the following types of civil/site engineering projects: Project examples include: City of Hialeah Auxiliary Parking Lot JFK Library Parking Lot, City of Hialeah City of Laudrdale Lakes Bus Shelters EPD Laboratory Green Building, Broward County Broward College Central Campus Streetscape Planning and Design Site Engineering City Street Planning and Design Traffic Studies Recreational Facility Design Neighborhood Studies Design of Sanitary Sewer Systems Streets Resurfacing Cost Estimating Funding Applications/LAP Certifications Water Distribution Design Grant Applications Structural Engineering Contract Administration BC FAU Parking Garage EDP Lab Green Building Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section E – Page | 2 RJ Behar has extensive experience in the planning and design of parks and recreational facilities. Our experience spans from the design of additional parking at existing facilities, as in the Sunrise Athletic Complex, to master planning a major facility like Holliday Park. We have experience working on historic sites such as the improvements to the Old Davie School House, which included the creation of one acre of Florida wetland, have worked on marinas, fishing piers and boat ramps. We have also designed Fitness Trails and Multi-Use Trails in Davie and Southwest Ranches. For the City of Lauderhill, we designed lighting improvements for several parks. Many of the projects included the paving and grading, upgrade of water, sewer and drainage facilities as well as procuring all the necessary permits. We have also prepared design-build criteria packages for comprehensive park improvements, preparing and selecting specifications for benches, courts, pavilions, bleachers, garbage receptors, and miscellaneous appurtenances. We have designed multiple pedestrian bridges including Mc Donald Park for the City of Hialeah and designed and inspected the pedestrian/bicycle trail for the City of Doral. The following is a list of projects related to parks and recreation facilities completed by RJ Behar.  Bucky Dent Park – City fo Hialeah  Spanish River Athletic Facility (AKA Countess De Hoernle) – City of Boca Raton  Gilbert Samson Park – City of Sunny Isles  Peaceful Ridge Dog Park – Town of Davie  Forzano Park – City of Miramar  West Wind Park – City of Luaderhill  Miami River Greenways – City of Miami City Meetings/Public Presentations In many of our projects we must interact with the general public. We make ourselves available to meet in the public’s best schedule hours and at their preferred locations. We have performed public information programs for the FDOT on our highway projects. We can prepare materials for presentations including digital presentations, boards, handouts, etc. and have scheduled public meetings, workshops, and meetings with officials, politicians and general public. In our previous projects, we have worked with staff members from different departments, service centers, constructions, operations, etc. and have successfully completed tasks in close coordination with staff. We have prepared Community Awareness Plans and Public Involvement Plans for sensitive projects. These plans identify the project stakeholders, community representatives, and City, County, and local officials. The plan also identifies the need for meetings, whether individually, in groups, or public meetings/workshops and the action plan. These meetings then should be included as part of the project schedule. Public Sector Engineering/Grant and Funding Assistance RJ Behar has extensive knowledge with public sector engineering. We have assisted with the preparation of State and Federal grant applications as well as the reporting requirements associated with the program management of different types of grants. RJ Behar has provided funding assistance to the City of Lauderdale Lakes, the Town of Southwest Ranches, Town of Davie, Town of Medley, City of Miramar, among others. We have assisted in obtaining Florida Department of Transportation Local Agency Program (LAP) certifications. As an example, RJ Behar assisted the Town of Davie in obtaining FDOT certification for Local Agency Program (LAP) funding for town capital projects. RJ Behar prepared all the FDOT required documents for certification and I-95 at 6th Ave. PD&E Spanish River Athletic Facility Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section E – Page | 3 coordinated with FDOT’s LAP administrator as well as assisted the Town Council and Town Administrator during the certification process. We assisted the Town of Southwest Ranches in obtaining funding for the construction of the Stirling Road Loop Multipurpose Trail. The funding was obtained from the Metropolitan Planning Organization (MPO) and coordinated through Florida Department of Transportation (FDOT) and Broward County. The Town was awarded approximately $500,000 for this project. ENVIRONMENTAL & WATER RESOURCES ENGINEERING RJ Behar’s services include Environmental Engineering, Water Resources and Stormwater Master Planning. We can provide environmental reports, monitoring, assessments, design, construction documents, permitting, and construction administration on any Environmental Project. We are experienced in obtaining permits from agencies such as the Water Management Districts, Local Drainage Districts, Department of Environmental Protection, the U.S. Army Corps of Engineers, the FDOT, Health Department and numerous City and County agencies throughout South Florida. RJ Behar has developed expertise in the areas of environmental engineering and water resources. Services in this area include:  Phase I and II Site Assessments and Remediation Plans  Wetland Mitigation Plans Design  Stormwater Master Planning  Hydrologic-hydraulic and Watershed Modeling  Sustainable Design LEED AP Certifications  Bridge Hydraulics and Scour Analyses  Stormwater Sewer Design  Open Channel Hydraulics/Canal Conveyance/Energy Dissipation  Flood Control and Drainage Studies  Injection Well Design  Highway Drainage  Sanitary Sewer Collection  Best Management Practice Plans  NPDES Permitting for Construction Activities  Stormwater Pump Stations  Gates/Culverts/Spillways Design  Environmental Permitting  Water Quality Modeling  FEMA Assistance  Environmental Permitting  Preparation of environmental documents for NEPA compliance  Dewatering Plans  MS4 Permitting Assistance RJ Behar has considerable expertise in the area of water resources. Our staff has developed expertise in the design and analysis of wastewater and water distribution systems. We have designed water and sewer services for commercial sites and our staff has developed wastewater and water distribution plans for citywide systems and to service Industrial Parks and new communities. RJ Behar has worked on several significant projects in the City of Hallandale Beach such as the Stormwater Drainage Improvements for Chaves Lake and I-95; the services included a Springtree Canal Rehabilitation FEMA Mitigation Pump Station Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section E – Page | 4 Hydrologic/Hydraulic study, installation of groundwater monitoring wells, stormwater master plan, and flood control study and implementation plan. RJ Behar assisted the City of Hialeah with the preparation of the stormwater assessment program, as required by the Municipal Separate Storm Sewer System (MS4) Permit. We prepared the water quality monitoring plan, pollutant loadings/evaluation, prepared two Public Education and Outreach Presentations for Illicit Discharges and Use of Pesticides, and prepared a Bacteria Pollution Control Plan. Currently, RJ Behar is assisting the City of Miami Gardens with an update to the City- wide Stormwater Management Master Plan. Project experience in water resources includes:  Lake Okeechobee Water Retention/Phosphorus Removal Critical Restoration Project, SFWMD  Assessment of Water Management Practices Within the Four Priority Basins of the Lake Okeechobee Watershed  Stormwater Consultant for the City of Hallandale Beach  City of Hialeah Mulching Pit Solid Waste Permit and Groundwater Monitoring Plan  Stormwater Pollution Prevention Plan for I 95 Pump Station project  City of Miramar Citywide Canal Assessment  Maintenance Dredging Evaluation C-16 Canal  Lake Chaves and I-95 flood study  Hillcrest Golf Course Drainage Study  Don Shula Expressway Stormwater Master Plan  NW 5th Street Bridge Hydraulic Report  C 4 Canal Flood Protection  Hickory Hammock Equestrian Campground Site Design Water & Sewer Design In the area of water distribution and wastewater collection, we have extensive expertise. We provided general engineering services contract for the Broward County Water and Wastewater Services Department and we participated in the Waterworks program for the City of Fort Lauderdale. In these contracts RJ Behar performed the design of water distribution systems, conversion of septic tank neighborhoods to wastewater collection systems, new pump station design, rehabilitation of existing lift stations, electrical and mechanical evaluations, preparation of Basis of Design Reports (BODR), review of master planning documents, evaluation of sites for communication towers, hydraulic analyses and calculations, as well as construction administration and observation services. For Palm Beach County, RJ Behar designed the relocation of 1,310 feet of 20-inch water main and 1,299 feet of 16-inch force main relocation as part of the Northlake Boulevard Bridge over the Loxahatchee Slough. The new water main and force main are located on the new bridge. RJ Behar prepared all the details and structural design to accommodate the new utilities on the bridge. Other projects include: MS4 NPDES Stormwater Assessment, City of Hialeah Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section E – Page | 5  SE 3rd Street between Martin Luther King, Jr. Boulevard and G Avenue, Belle Glade, Palm Beach County, Florida. This was a Design-Build contract with water and sewer relocations.  UAZ Zone 303 for the Broward County Water and Wastewater Services Department.  Sistrunk Boulevard Water Main relocation for the City of Fort Lauderdale.  Shady Banks Septic Tank Area 5 conversion to sanitary collection.  The Broadview Estates Neighborhood Improvement Project (BENIP) project. RJ Behar provided support in the preparation of sanitary sewer plans for bid package No 2.  Crown Linen sewer connection in the City of Hialeah.  The Public Safety Building for City of Coral Springs.  Copans Road Waterwater System new Transmission System and Existing System Rehabilitation Pump Stations Our experience with pump stations includes both sanitary pump stations and stormwater pump stations. For the South Florida Water Management District (SFWMD), we have inspected more than 20 stormwater pump stations. These inspections included all the components including civil, structural, mechanical, and electrical systems. The inspection reports also included cost estimates of the necessary repairs. We have been involved in other pump station designs such as the I- 95 Stormwater Pump Station for FDOT District 4, the FEMA mitigation stormwater pump station for the City of Hallandale Beach, the Bay Road stormwater pump station for the City of Miami Beach, the U.S. Army Corps of Engineers Pump Station 362 structural evaluation, and the City of Miami Riverview Pump Station New Generator Retrofit. For the Broward County Water and Wastewater Services Division, we completed design for the rehabilitation of two sanitary pump stations as part of the UAZ Zone 303 utility improvements project. RJ Behar can provide full support for pump station design including hydraulic design, site design, electrical, mechanical, and structural components. Familiarity with Permitting Agencies Our experience with permitting includes all types of projects. In our A1A project for the FDOT, as an example, we had to permit the project with the FDEP and the USACE. The project was inside the coastal construction control line (CCCL) and included wetland (mangrove) impacts. We designed a mitigation project and coordinated it with a local municipality, which allowed them to enhance an existing park alongside the Intracoastal Waterway. In the project, we also prepared the stormwater pollution prevention plans to comply with the NPDES permitting for construction activities. We prepared the fill and dredge plans, permitting and the mitigation site permitting. RJ Behar is currently serving as one of two firms who serve as District Drainage Engineers (DDE) for the Central Water Control District. As DDE, RJ Behar reviews plats, applications for water management work permits, paving and drainage plans, as-built plans, and permit renewal applications for conformance with the District’s drainage regulations, standards, procedures, and design criteria. RJ Behar also provides other services including drainage criteria, manual updates, special studies, data collection and monitoring, computer modeling, geographic information systems, master planning, design, permitting, cost estimating, construction inspection services, facilities financing, facilities operations and other services as directed by the District. Permit reviews are conducted and verified against District criteria. RJ Behar also participates in the District Board Meetings as representative to the District. Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section E – Page | 6 We permitted the 5th Street Bridge over the Miami Canal. We prepared the entire fill and dredge permit plans that included work in the navigation channel, seawall construction and outfall retrofits. RJ Behar also completed the permitting of the new Northlake Bridge over the Loxahatchee Slough in Palm Beach County. The project included work in very sensitive wetlands for construction of berms, a new weir, and canoe facilities. For SE 3rd Street Reconstruction in the City of Belle Glade, RJ Behar obtained permits from the SFWMD and the South Florida Conservancy District (SFCD). Services included drainage design, utility relocation plans, and water and sewer plans to be constructed as part of the roadway improvements RJ Behar’s experience also includes the construction inspection and supervision of wetland and fill/dredge activities. We performed those services for the SFWMD at the Deering Estates Flow-way project which included construction of a man-made wetland for educational purposes. We also inspected the Southern Crew Imperial River Restoration Phase 1 and 2. Restoration activities included regrading existing filled and agricultural areas, filling ditches, and removing berms in accordance with the proposed restoration plan. The completed project provided shallow foraging habitat in the freshwater marsh areas and gentle side slopes on the deep water depressions for tactile feeder wading birds, specifically the Wood Stork, white ibis, and roseate spoonbills. Additionally, the plan provided and maintained the existing Panther habitat. Existing Cypress areas remained and exotic vegetation was removed. TRANSPORTATION & TRAFFIC ENGINEERING Transportation Engineering was the foundation of RJ Behar. In approaching all transportation planning projects, RJ Behar integrates the land use issues and transportation relationships in order to provide the proper balance between the travel modes and the operation of the facility, taking into consideration the social, environmental and engineering constraints, and available funding to provide innovative and practical solutions for our clients. We also recognize the importance of involving the public throughout our planning process in order to obtain meaningful solutions, which increase our chances towards a successful project. We strive to develop smooth flowing, pedestrian friendly transportation solutions for all our clients. We provide transportation engineering design services in the following areas:  Urban Roadway Design  Rural Roadway Design  Freeway Design (Limited Access Facilities)  Intersection Improvement Design  Resurfacing Street Design  Pavement Marking and Signing  Plans Signalization Plans  Lighting Plans  Utility Coordination  Drainage Design and Permitting  Culvert Designs  Embankment earthwork calculations Some samples of transportation planning services include: Northlake Blvd Over Loxahatchee Slough Land Use Amendment Plan/Traffic Study Deering Estates Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section E – Page | 7  NW 8th Street at Hallandale Beach Boulevard  Transportation Master Plan, Traffic Counts, City of Hallandale Beach  Palm Avenue Master Plan, Hialeah  NW 7th/9th Connector Study, Fort Lauderdale  NW 13th Street Master Plan, Fort Lauderdale  US-1 Busway Study, Miami-Dade  Gratigny Parkway Feasibility Study, Opa-Locka  I-95 Downtown Feasibility Study  Flagler Street Master Plan, Miami  E. 1st Avenue Master Plan, Hialeah Major traffic analysis projects included:  NW 87th Avenue - Traffic Study  Coral Springs Neighborhood Transit Center  Grand Palms - Traffic Study  Palm Avenue at 17th Street Roundabout Intersection Analysis  Powerline Road Access Management  1st Avenue Traffic Analysis, Hialeah  Town Traffic Study-Town of Southwest Ranches Roadway Design RJ Behar began as a roadway design firm. Our primary expertise is roadway design and most of our other areas of expertise came by way of roadway design or by supplementing our roadway design capabilities. Our comprehensive roadway design experience and expertise includes: Roadway Plans, Traffic Studies, Signal Design, Pavement, Marking & Signing Design, Traffic Control Plans, Lighting Plans, Drainage & Permitting, Utility Relocation Plans and Public Involvement. Our staff has extensive roadway design experience including design of major arterial roadways such as:  SR-845/Powerline Road, FDOT D4  Atlantic Boulevard/Rock Island Road, Margate  US-1/SR-5, FDOT D4  SR-A1A, FDOT D4  Andrews Avenue, Pompano Beach – FDOT D4  NW 44th Street, Lauderdale Lakes  SR-907/Alton Road, FDOT D6  S.W. 27th Avenue, FDOT D6  SR-94/Kendall Drive, FDOT D6  SR-25/Okeechobee Road, FDOT D6  Turnpike Widening in Broward County  I-595 Improvement Project, FDOT D4 We also have extensive roadway design experience on local city streets such as NW 44th Street in Lauderdale Lakes, E. Palomino Drive and S.W. 62nd Court in the Town of Southwest Ranches, Bayshore Drive in Miami, N.W. 13th Street and N.E. 15th Avenue in Fort Lauderdale, and 19 miles of street resurfacing in the City of Tamarac. Traffic Planning RJ Behar has developed expertise in the Transportation Planning and Traffic Engineering field. RJ Behar has become very familiar with the Manual of Uniform Traffic Control Devices (MUTCD), The Florida Greenbook (voting member), Florida NW 8th Street at Hallandale Beach Boulevard I-595 NW 87th Avenue Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section E – Page | 8 Department of Transportation Standards, American Association of State Highway and Transportation Officials (AASHTO). RJ Behar owns data capturing equipment and has in-house trained staff to collect and process traffic volume data. We can perform traffic volume counts, speed studies, turning movement counts, vehicle classification studies and vehicle cut-through Analysis. These traffic data gathering services are performed by our in-house staff and do not require the involvement of a third party subconsultant. This allows us flexibility and the ability to respond to our client’s request for these services efficiently and on short notice. We have state of the art computer equipment and all the latest engineering software to produce any necessary traffic plan including Synchro, CORSIM and TSIS, McTRANS HCS+T, TRAXPro, Cube 5, PETRAPro, and TCU. RJ Behar has experience in the design of modern roundabouts. We have provided contract documents for several roundabouts. Roundabouts were designed at NW 146th Street/N. Miami Avenue/S. River Drive – Roundabout, Miami-Dade County; Palm Avenue/E. 17th Street in Hialeah and at N.E. 15th Avenue/N.E.18th Street in Fort Lauderdale. STRUCTURAL ENGINEERING Our in-house structural design capabilities enable us to provide complete design services for our clients. Our structural design capabilities include:  Bridge Design (minor and major bridges; new bridges and widening)  Bridge Repairs and Complete Rehabilitation (Minor, major and bascule bridges)  Bridge Inspections (Minor, major and bascule bridges)  Pedestrian Bridges  Box Culvert and Special Drainage Structure Designs  Mast Arm Design for traffic signals  Retaining Wall Systems  Overhead Sign Structures  Water Control Structures  Recreational Structures  Pump Stations  Retaining Walls (Permanent and Temporary)  Fender Systems  Miscellaneous Buildings In the community of Golden Isles in Hallandale Beach, RJ Behar completed structural inspection of seven existing bridges, structural design for replacement of parapets and evaluation for the addition of sidewalks and preparation of plans for the improvements. The project also included public involvement to determine the type of aesthetic bridge railings. RJ Behar provided structural design plans for McDonald Park Pedestrian Bridge, City of Hialeah, Florida. Services included project management, plans preparation, structural engineering, contract documents, permitting, shop drawing reviews, utility coordination and contract specifications services. We completed evaluation of structural systems at recreation facilities such as Playground & Recreational Facilities at Betti Stradling Memorial Park, and Boat Ramp at Riverside Park for the City of Coral Springs; Structural Inspection & Survey and Report Services at Charles Deering Chinese Bridge, and Structural Inspection & Survey Metro Zoo Monorail for Miami-Dade County. We have provided services to Palm Beach County under our Structures Annual Contract over the past thirteen years. Under NW 146th St./N. Miami Ave./S. River Drive Roundabout – Town of Davie Cypress Weir Replacement Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section E – Page | 9 that contract we have reviewed plans, designed bridge replacements and several miscellaneous structural assignments. Notable projects include:  S-5A Boat Ramp, kiosks, board walk, and sheep piling system  Design of concrete slabs, and miscellaneous structures for the Hickory Hammock Equestrian Campground  Feasibility Study for berm at the C-4 Canal – This included evaluation of sheet pile and cast in place concrete wall systems  Design of Fender System for the S 310 Navigation Lock  S-193 Boat Lock Rehabilitation  S5A Pump Station Intake Bridge Repairs  S61, S66, S65A and S65D Lock Rehabilitations  S40, S41 and S44 Gate Replacements and Concrete Repairs  Cypress Weir No 1 Replacement  S135 By-Pass Culvert Abandonment  S-31, S-33, G-36 Navigation Lock Hoist Upgrades  S-44 & G-57 Spillways Hoist Upgrades  Kirk Road Bridge over LWDD L-9 – Palm Beach Co.  Miramar Town Center Bridge/Culvert  Spanish River Park Structures – Boca Raton CONSTRUCTION ENGINEERING INSPECTION & MANAGEMENT RJ Behar is certified by FDOT in Construction Engineering Inspections Services and has provided services on a general construction management contract with the South Florida Water Management District. We offer a full range of construction engineering services. These services range from providing Construction Engineering & Inspection (CE&I) to providing on-call site engineering services for land development and municipal projects. Our proposed team members are all trained and CTPQ certified with the FDOT. They are familiar with all of the required contract provisions for construction contracts including all monitoring and reporting requirements, contract, and project billing documentation. We provide both infrastructure inspection as well as building inspection services. Our construction management team includes licensed General Contractors and licensed Threshold Inspectors. The key to our success in providing contract administration services includes:  Proper interpretation of the construction bid documents,  Maintaining detailed documentation throughout the construction,  Documenting change orders and quantity revisions,  Documenting changes in field conditions, and  Being Responsive. RJ Behar has provided construction inspection services under continuous basis contracts to the Cities of Lauderdale Lakes, Fort Lauderdale, Coral Springs, Hialeah, Palm Beach County, and the South Florida Water Management District. Projects included:  Wiles Road, Broward County  Safe Routes to School LAP Projects, Town of Cutler Bay  Nova Drive, Town of Davie Hatton Highway Bridge Replacement Lauderdale Lakes Regional Library Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section E – Page | 10  C-4 Canal Restoration, SFWMD  33-Unit Elderly Housing, City of Hialeah  Inspection of the S-310 Lock Structure Rehabilitation, SFWMD  Citywide Resurfacing Inspection, City of Coral Springs  N.W. 43rd Avenue/City Hall Parking Lot, City of Lauderdale Lakes  N.W. 44th Street Improvements, City of Lauderdale Lakes  NW 97th Avenue Construction Management, City of Hialeah  Citywide Swale Restoration Project, City of Lauderdale Lakes  Super Wal-Mart Inspections, City of Lauderdale Lakes  SR-5 and SR811 Pedestrian Bridge Replacement, FDOT RJ Behar has provided FDOT with Oversight Construction Engineering and Inspection (OCEI) services for several local agencies throughout the Tri-County Region who received Federal-ARRA Funds. As oversight to FDOT, RJ Behar’s personnel ensured that the local agency was in full compliance with construction contract documents, project administration, ARRA Federal Requirements, and FHWA 1273 regulations including Equal Employment Opportunity (EEO), Affirmative Action (AA), Davis-Bacon, Disadvantage Business Enterprises (DBE), and On-The- Job (OJT) Training. The oversight inspection team was responsible for monitoring that the work was performed in accordance with plans and specifications; oversaw the sampling and testing of component materials; attended conference meetings with the District; and maintained accurate records and documentation of all project-related activities. All documentation was loaded into the LAP-It program. We have in-house resident compliance specialists. SUBCONSULTANTS: Tierra South Florida, Inc. (TSF) {MBE} is a full-service consulting geotechnical engineering, construction materials testing and inspections firm with capabilities to provide test borings, engineering analyses and reports, AutoCAD and MicroStation plan sheets, laboratory soils testing, and construction engineering inspection services. Our professional team has been working together since 2000 and is committed to providing quality, responsive service establishing a reputation for sound approaches and professional competence in a wide range of technically demanding areas. TSF services also include threshold/special inspection and roofing inspection services. TSF is a certified Disadvantaged Business Enterprise (DBE) with the Florida Department of Transportation and a certified MBE with the State of Florida’s Office of Supplier Diversity and the City of Orlando. Additionally, TSF is a certified Small Business Enterprise (SBE) with the City of West Palm Beach, Palm Beach County, SFMWD and the School District of PBC. Our main office is in West Palm Beach, Florida with branch offices in Miami Lakes, Tampa and Orlando, Florida. TSF’s staff includes principal engineers with more than 32 years of experience in geotechnical, construction, laboratory and field materials testing and inspection services. We feature master’s degree level or higher educational background amongst the majority of our Registered Professional Engineers and maintain licenses in the State of Florida. Geotechnical Engineering: TSF can provide a complete range of geotechnical engineering services. They help define the construction and long-term performance risks associated with subsurface conditions. TSF will evaluate and then develop recommendations regarding both existing structures and new construction. Whether buildings, airport facilities, transportation systems, landfills, dams, or other civil and private projects, their engineers have the experience and expertise to handle the most technically demanding projects. TSF owns a large, diverse fleet of 8 drill rigs with automatic hammers (truck-mounted, track-mounted, rotary, tripod, ATV, barge) capable of drilling in challenging conditions including remote, soft, marshy, over-water, difficult access or environmentally sensitive areas. They also have Maintenance of Traffic (MOT) Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section E – Page | 11 certified staff to safely perform drilling services in high traffic areas. TSF’s geotechnical services include: Laboratory testing and analysis, Subsurface exploration, Site preparation recommendations, Soil reinforcement, Expert witness testimony, Value engineering, Pavement evaluations and design, Deep and shallow foundation analysis and design, Slope stability analysis, Corridor studies, Sinkhole studies, Unknown Foundation studies. Javier E Bidot & Associates, P.S.C., Corp., (JEBA) will provide land surveying services. JEBA is a small business land surveying practice that upholds the profession to the highest standard as it commits to their clients with character, integrity and the incessant pursuit of a balance of quality, timeliness and value in a manner befitting a model for future generations. JEBA conducts a professional practice of land surveying and mapping focused on quality, performance and timely delivery of complex critical infrastructure, industrial, commercial, and engineering survey projects that may require the expert application and management of technology, experience and the human resource. JEBA is SFWMD Certified Small Business Enterprise, also a National Certified Minority Supplier, HubZone firm and has been certified as DBE and MBE through the Florida Unified Certification Program. In the last 20 years, JEBA has catered to federal, state, and municipal government organizations and the private sector for large scale infrastructure, transportation, utilities, topographic and engineering surveys. JEBA services include: Infrastructure & Engineering Surveys, Hydrographic Surveys, Subsurface Utility Surveys - All work is performed in strict conformance with ASCE specification 3802, ALTA/ACSM, Topographic & Boundary Surveys, Construction Stakeout, Third Party QA/QC and Construction Monitoring, GIS, Infrastructure Route Surveys, and 3D Scanning & High Definition Surveys. Underwater Inspection Services, Inc. (UESI) is a leading specialty engineering, commercial diving, and civil marine contractor operating throughout the world. UESI offers a wide range of services and turnkey solutions as well as design and specialty services uniquely applicable to the needs of customers ranging from nuclear power plant operators to heavy marine construction companies. UESI’s core values of Safety, Customer Service, Quality, and Innovation form the foundation on which they perform work and conduct business. UESI is a customer centric organization where every project starts and ends with customer satisfaction in mind. They consider customer satisfaction as a core value second only to safety. A collaborative approach is embedded in all of our business practices. It is only in this way that the true needs of each customer can be met. UESI provides specialized engineering, consulting, inspection, maintenance, repair, and construction services to customers worldwide. UESI services cover assets located both above and below the water and support operating facilities as well as facilities undergoing decommissioning. UESI has the capability and resources to respond rapidly to emergent work, perform large scale turnkey projects, and support multi-year service contracts. UESI has extensive experience in performing repair and maintenance work on wood, steel, and concrete structures. With their in-house engineering capability, they are able to address the design/build needs of complex repair or maintenance requirements. UESI’s highly skilled dive teams and construction specialists, these services are easily applied to challenging problems often facing facility owners and operators. Services include: Engineering/Inspection/Survey, Consulting Services, Laboratory Services, Testing Services, Training Services, Protective Coatings/Corrosion Control, Inspection Services, Maintenance Services, Repair/Restoration, Marine Construction. ARCHITECT - ENGINEER QUALIFICATIONS PART I - CONTRACT-SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1. TITLE AND LOCATION (City and State) Continuing Professional Consulting Services (CCNA) – City of Sunny Isles Beach, Florida 2. PUBLIC NOTICE DATE July 8, 2020 3. SOLICITATION OR PROJECT NUMBER RFQ 20-07-01 B. ARCHITECT-ENGINEER POINT OF CONTACT 4. NAME AND TITLE Paola Riveros, PE – Project Manager 5. NAME OF FIRM R.J. Behar & Company, Inc. 6. TELEPHONE NUMBER (954) 680-7771 7. FAX NUMBER (954) 680-7781 8. E-MAIL ADDRESS priveros@rjbehar.com C. PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors.) (Check) 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT PRIME J-V PARTNER SUBCON- TRACTOR a. ✓ R.J. Behar & Company, Inc. CHECK IF BRANCH OFFICE 6861 SW 196th Avenues, Suite 302 Pembroke Pines, FL 33332 ▪ Civil Engineering ▪ Structural Engineering ▪ Construction Engineering and Inspection (CEI) Services b. ✓ Tierra South Florida, Inc. CHECK IF BRANCH OFFICE CHECK IF BRANCH OFFICE 2765 Vista Parkway, Suite 10 West Palm Beach, FL 33411 Geotechnical Engineering Services c. ✓ Javier E. Bidot & Associates, PSC Corp CHECK IF BRANCH OFFICE 2385 NW Executive Center Drive Suite 100, Boca Raton, FL 33431 Surveying Engineering Services d. ✓ Underwater Engineering Services, Inc. CHECK IF BRANCH OFFICE 3306 Enterprise Road, Fort Pierce, FL 34982 Underwater Inspections e. CHECK IF BRANCH OFFICE f. CHECK IF BRANCH OFFICE D. ORGANIZATIONAL CHART OF PROPOSED TEAM ✓ (Attached) AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (REV. 8/2016) Section E – Page |12 ✓ ✓ Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 0-07-01 Organizational Chart & Availability CIVIL ENGINEERING STRUCTURAL ENGINEERING CONSTRUCTION ENGINEERING & INSPECTIONS SERVICES CITY OF SUNNY ISLES BEACH Paola Riveros, PE [65] Project Manager Juan H. Vazquez, PE, PH, BCEE QA/QC [35] Robert J. Behar, PE [55] Principal in Charge T EAM C ONSULTANTS R.J. Behar & Company, Inc. (RJB) {MBE} Tierra South Florida, Inc. (TSF) {MBE} Javier E. Bidot & Associates, PSC Corp (JEBA) {MBE) Underwater Engineering Services, Inc. (UESI) Robert J. Behar, PE [55] Paola Riveros, PE [65] Jasmani Riveron, PE [65] Xamarah Seda-Velez [65] Angel Marinez [65] Nanette Akyaz–Gomez [45] Roadway, Streetscape, Sidewalks, Parking Lot, Pavement Evaluation & Repairs, Signing & Marking Rafael De Arazoza, PE, PTOE [80] Hector Rosario, EI [75] Michelle Leon, EI [45] Jaime Delgado [75] Logan Fasanella [90] Transportation Planning & Traffic Studies Nestor Santana, PE [85] Alejandro Medina [80] Michelle Leon, EI [45] Logan Fasanella [90] Zugeil Velez [90] Construction Administration Services and Inspections, On-site Representation CONSTRUCTION ENGINEERING & INSPECTIONS Raj Krishnasamy, PE [30] Francois Thomas, PE [60] Geotechnical Engineering & Material Testing (TSF) Javier E. Bidot Cruz, PSM [50] Carlos Lebrón Cabrera, PLS [50] Land Surveying Services (JEBA) CIVIL ENGINEERING Jeffrey O’Connor, PE, LEED AP [60] Marty Faulk, CBI [60] Vince Trotta [60] Underwater Inspections (UESI) Nestor Santana, PE [85] Jose A. Peña, PE [75] Construction Cost Estimating STRUCTURAL ENGINEERING Jose Peña, PE [75] Jerry Piccolo, PE [25] Jossmel Cruz-García, EI [75] Bridges, Structural Systems, Seawall Structures, Buildings, Water Wastewater Plants, Miscellaneous Structures Jose A. Peña, PE [75] Rafael Droz Seda, PE [80] Nestor Santana, PE [85] Threshold Inspections Jose A. Peña, PE [75] Jerry Piccolo, PE [85] Jossmel Cruz-García, EI [75] Rehabilitation & Strengthening of Existing Structures Robert J. Behar, PE [55] Juan H. Vazquez, PE [35] Paola Riveros, PE [65] Carmelo J. Ramos, PE [65] Xamarah Seda-Velez [65] Joyce Ledan, EI [65] Civil/Site Design, Feasibility Studies, Parks and Recreational Facilities, Lighting Juan H. Vazquez, PE, PH [35] Elmer Cardenas, PE, CEI [80] Hans Murzi, PE, CFM [75] Carmelo J. Ramos, PE [65] Hector Rosario, EI [75] Joyce Ledan, EI [65] Xamarah Seda-Velez [65] Nanette Akyaz-Gomez [45] Drainage, Stormwater Wells, Pumps, Water Distribution, Wastewater Collection Systems Juan H. Vazquez, PE, PH [35] Elmer Cardenas, PE, CEI [80] Hans Murzi, PE, CFM [75] Environmental Permitting Robert J. Behar, PE [55] Juan H. Vazquez, PE, PH [35] Rafael De Arazoza, PE, PTOE [80] Compliance with Federal, State and Local Regulatory Agencies Paola Riveros, PE [65] Jasmani Riveron, PE [65] Jaime Delgado [75] Utilities SUPPORT SERVICES [%] Availability Section E –Page | 13 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) 12. NAME PAOLA RIVEROS, PE 13. ROLE IN THIS CONTRACTProject Manager; Roadway Streetscape,Sidewalks, Parking, Pavement Evaluation &Repairs, S&M; Civil/Site, Feasibility Studies, Parks and Recreational Facilities, Lighting, Utilities 14. YEARS EXPERIENCE a.TOTAL 19 b. WITH CURRENT FIRM 19 15. FIRM NAME AND LOCATION (City and State)R.J. BEHAR & COMPANY, INC. 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 16. EDUCATION (Degree and Specialization)B.S. Civil Engineer, Florida International University/2001 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) P.E. Florida No.74249/2012 P.E. Washington, D.C., No. 905769/2010 18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)Ms. Riveros has been responsible for the preparation of roadway plans, drainage plans and site plans throughout South Florida. Ms. Riveros is fully knowledgeable of Microstation. Ms. Riveros completed a computer course with introduction to GIS software in the application to contamination of surface water bodies to determine affected zones by the plume. She has worked in several water and sewer projects. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State)SW 136th Street from US-1 to Old Cutler Road Lap Project, Miami-Dade County, Florida – Village of Palmetto Bay/Florida Department of Transportation (FDOT), District 6 (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) Post Design Ongoing (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmProject Engineer: She was responsible for designing the roadway plans, pavement marking and signing plans, utility coordination, drainage design and, permitting. The improvements will require milling and resurfacing the existing roadway and pavement widening to accommodate an on-road dedicated bicycle lane. The primary challenge for this project was accommodating the proposed sidewalks and bicycle lanes in a right of way constrained corridor. Project Length:1.92 miles; Project #: 434687-1; Cost/Fees Paid: $193,171.00; Construction Cost: $1,700,345.00 b. (1) TITLE AND LOCATION (City and State)I-595 Mobility Hub Park and Ride, Broward County, Florida - FDOT, District 4 (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) 2019 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firmProject Manager responsible for the parking lot design, drainage design, and signing and pavement markings. The scope of work included modifying the mobility hub to increase and maximize the number of parking slots, review the connections to improve access control, and improve circulation. The improvements required modification to the existing drainage, lighting, signing and pavement markings, and landscaping. She was also responsible for the preparation of a Community Awareness Plan, preparing Flyers, and attending a public meeting. Cost/Fees: $86,500 Construction Cost: 900,000 c. (1) TITLE AND LOCATION (City and State)NE 151st Street Improvements, Miami-Dade County, Florida – Oleta Partners LLC/Miami-Dade County (2) YEAR COMPLETED PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmProject Engineer: She is responsible for assisting with the roadway design, drainage design, signing and pavement markings, signalization, lighting, wetland assessment, and utility coordination. NE 151st Street is an off-system roadway bound by the Florida Greenbook, for its design criteria. Drainage design includes a series of interconnected French drains with drainage wells. Project Length: 0.876 miles Cost/Fees Paid: $498,000.00; Construction Cost: $5,757,000.00. d. (1) TITLE AND LOCATION (City and State)Atlantic Boulevard at Rock Island Road, Intersection Improvement, Broward County, Florida – Broward County Construction & Engineering (2) YEAR COMPLETED PROFESSIONAL SERVICES 2013 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmTraffic Engineer: She performed a traffic analysis to determine the existing Level of Service (LOS) and provide recommendations to improve the existing deficiencies, which also included projections for the design year, which was performed as part of the design project. Cost/Fees Paid: $386,000; Construction Cost: $4,100,000 Project Length: 0.51 miles e. (1) TITLE AND LOCATION (City and State)City of Lauderdale Lakes Canal System Stabilization Project, Broward County, Florida – City of Lauderdale Lakes (2) YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmProject Engineer: Ms. Riveros led the effort to perform the field inspections on land and by boat, prepared the alternative evaluation matrix, and the final report of the canal evaluation with conclusions and recommendations. She also prepared plans for the improvements. Cost/Fees Paid: $208,116; Construction Cost: $2,900,000 STANDARD FORM 330 (REV. 8/2016) PAGE 2 Section E - Page l 14 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME ROBERT J. BEHAR, PE 13. ROLE IN THIS CONTRACT Principal in Charge; Roadway, Streetscape, Sidewalks, Parking, Pavement Evaluation; Civil/Site, Feasibility Studies, Parks, Lighting; Compliance w/ Federal, State & Local Regulatory Agencies. 14. YEARS EXPERIENCE a. TOTAL 45 b. WITH CURRENT FIRM 20 15. FIRM NAME AND LOCATION (City and State) R.J. BEHAR & COMPANY, INC. 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 16. EDUCATION (Degree and Specialization) B.S. Civil Engineering, University of Florida M.E. Civil Engineering, University of Florida 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) P.E. No. 21755 Florida/1980 P.E. No. 19800047 Indiana/1997 P.E. No. 6201043655 Michigan/1997 P.E. No. 19836 Kentucky/1997 P.E. No. E-62643 Ohio/1997 MOT Certified 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) He has been a very active member of various engineering societies. He has served as president of the South Florida Section and Miami-Dade Branch of the American Society of Civil Engineers, Chair of the American Society of Civil Engineers Highway Division, Chair of Florida Institute of Consulting Engineers Transportation Production Committee, and member of the Transportation Research Board’s Geometric Design Committee. He is a voting member of the Florida Greenbook Committee. Mr. Behar was awarded the Ben Watts Partnership Award in 2010. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Seawall Design at Tobie Wilson Park – Town of Medley, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Principal in Charge/Project Manager for the structural analysis and design, plans preparation and permitting with SFWMD, USACE. The scope of work included design of approximately 850 feet of new steel bulkhead wall with a concrete cap to be located on the north side of the park along the south bank of the Miami Canal. RJ Behar also assisted with the grant preparation and construction engineering services. Cost/Fees Paid: $112,000.00; Construction Cost: $900,000 (Estimated) b. (1) TITLE AND LOCATION (City and State) W. 76th Street from Hialeah Gardens Boulevard to W. 36 Avenue, Miami-Dade County, Florida – City of Hialeah (2) YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Manager who was responsible for the lighting design calculations and lighting plans; signing, marking and channelization plans as well. The scope of this project consisted of roadway reconstruction an d some milling and resurfacing of a two-lane road, curb and gutter type F, valley gutter, new sidewalks, on-street parking, exfiltration drainage systems, storm sewers, sodding, signing, pavement markings, and roadway lighting. This is part of the continuous neighborhood improvement program the City has been conducting for years. Under this program RJ Behar has completed more than 50 miles of City street improvements. Cost/Fees Paid: $50,038; Construction Cost: $1,110,000. c. (1) TITLE AND LOCATION (City and State) NW 35th Avenue Greenway Enhancement – City of Lauderhill, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2018 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Principal in Charge for the conversion of a jogging path to a Greenway from NW 35th Avenue from North Broward Boulevard to NW 5 th Place within the City of Lauderhill. The project included decorative elements to the existing asphalt jogging path/trail on the east side of the corridor, along three sections of NW 35th Avenue. As part of the community enhancement features project, there were pedestrian and bicy cle improvements, decorative lighting, ADA compliant sidewalks and curb ramps, landscaping, irrigation, roadway signage, pavement markings, including bicycle lane striping, and street furniture. This is a FDOT Local Agency Program (LAP) Project. Project Length: .569 Miles Cost/Fees Paid: $106,989.00; Construction Cost: $599,982.00; Financial Project Id No.: 431710-1-58-01 d. (1) TITLE AND LOCATION (City and State) Old Davie School Improvements – Town of Davie, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2013 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Manager for the civil engineering site design, drainage, utility improvements, including sanitary lift stations and submersible pumps, and site field visits The scope of the project consisted of site design, drainage, parking and utility improvements for an historical school (now converted to a museum) and an adjacent park property. Cost/Fees Paid: $116,528.00 Construction Cost: $1,100,000 e. (1) TITLE AND LOCATION (City and State) NW 87th Avenue, Miami-Dade County, Florida – Florida Department of Transportation (FDOT), District 6 (2) YEAR COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) 2019 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Principal in Charge/Project Manager for roadway design of new construction and reconstruction of NW 87th Avenue. The project included roadway/traffic control plan (TCP) design, pavement marking and signing, signalization, lighting, drainage and permitting, bridge construction, utility coordination, traffic study, traffic counts, traffic projections, and traffic warrants services. Project length: 2 Miles Cost/Fees Paid: $2,994,823.00; Construction Cost: $34,800,000 (Estimated); FM#: 405615-3-52-01 STANDARD FORM 330 (REV. 8/2016) PAGE 2 Section E - Page | 15 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME JUAN H. VAZQUEZ, P.E., P.H., BCEE 13. ROLE IN THIS CONTRACT QA/QC, Drainage, Stormwater Wells, Pumps, Water Distribution, Wastewater Collection Systems; Environmental Permitting; Compliance w/ Federal, State & Local Regulatory Agencies. 14. YEARS EXPERIENCE a. TOTAL 35 b. WITH CURRENT FIRM 19 15. FIRM NAME AND LOCATION (City and State) R.J. BEHAR & COMPANY, INC. 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 16. EDUCATION (Degree and Specialization) B.S., Civil Engineering, University of Puerto Rico/1985 Professional Hydrologist – License No. 05-H-1653 Board Certified Environmental Engineer 07-20009/2007 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) P.E. No. 51143 Florida/1996 P.E. No. 0402 025604 Virginia/1994 P.E. No. 11385 Puerto Rico/1989 P.E. No. 46482 Michigan/1999 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Vazquez is a Professional Hydrologist (PH) and a Board Certified Environmental Engineer (BCEE) specializing in water supply and waste water. For the eleventh year in a row, Mr. Vazquez is in the “Who’s Who book of Environmental Engineering, 2019.” He is a past president of the Association of Engineers and Land Surveyors of Puerto Rico, Florida Chapter (CIAPR). He was recognized as the Distinguished Engineer in 2014 by the Florida Chapter of the CIAPR. He is a past chair of the ACEC-FL South Florida Water Management District Liaison Subcommittee. Mr. Vazquez is a member of the Florida Greenbook Drainage Subcommittee. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Riverview Pump Station New Generator, Fire Suppression and Main Switch Disconnect, City of Miami, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Manager and Engineer of Record for civil and structural design to provide engineering services for the replacement of the Riverview Pump Station Emergency Generator and pumps interconnection in the City of Miami. The pump station is part of the city's stormwater system. The project also includes a subconsultant design of a new Fire Suppressant System and Main Switch Disconnect for the Pump Station. Cost/Fees Paid: $74,200; Construction Cost: $935,000 (Est.); Project #: M-0127 b. (1) TITLE AND LOCATION (City and State) Tressler Street Drainage Improvements - City of North Miami, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Manager/QC Assurance for this project. The improvements included upgrading existing drainage infrastructure by installing exfiltration trenches, solid piping, installation of new catch basin structures with baffles, regrading of swale areas, replacement of existing hand built catch basins, swale retrofit, and other Best Management Practices (BMPs) along Tressler Street including pervious pavements for swale reconstruction. Also included estimates, utility coordination, permitting and bid assistance. Cost/Fees Paid: $90,949; Construction Cost: $1,100,000 (Estimated). c (1) TITLE AND LOCATION (City and State) Waterline Design along NE16th Ave, NE 146 St, and NE 18 Ave – City of North Miami (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Engineer of Record: He conducted quality control reviews of the water line plans, and specifications. The project includes approximately 3,255 ft of new 16-inch DIP water line. Cost/Fees Paid: $87,600; Construction Cost: $904,352. d. (1) TITLE AND LOCATION (City and State) MS4 NPDES Stormwater Assessment Program, City of Hialeah, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Manager for the preparation of the stormwater assessment program, as required by the Municipal Separate Storm Sewer System Permit that was issued June 30, 2016. This permit covers all areas located within the political boundary of the City of Hialeah that is served by the MS4 owned or operated by the City. The purpose of this assessment program is to provide information for the City of Hialeah to determine the overall effectiveness of its Stormwater Management Program (SWMP) in reducing stormwater pollutant loadings from its Municipal Separate Storm Sewer System (MS4) to receiving water bodies. Cost/Fees Paid: $9,772; Construction Cost: N/A. e. (1) TITLE AND LOCATION (City and State) Lakeshore and River Run Park Improvements – City of Miramar (2) YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Manager and EOR for master planning and civil design of the improvements. Improvements included building modifications, additional parking, new lighting, grading and drainage and reconfiguration of existing parking, and park appurtenances such as benches, trash collectors, new fountains and playgrounds. Cost/Fees Paid: $118,604.64; Construction Cost: $700,000.00 STANDARD FORM 330 (REV. 8/2016) PAGE 2 Section E - Page | 16 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME RAFAEL DE ARAZOZA, PE, PTOE, CPM 13. ROLE IN THIS CONTRACT Transportation Planning/Traffic Studies; Compliance w/ Federal, State & Local Regulatory Agencies 14. YEARS EXPERIENCE a. TOTAL 44 b. WITH CURRENT FIRM 10 15. FIRM NAME AND LOCATION (City and State) R.J. BEHAR & COMPANY, INC. 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 16. EDUCATION (Degree and Specialization) BS Civil Engineering, Florida International University, 1975 Florida State University/FDOT, Certified Public Manager (CPM), 1989 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) PE Florida License No. 24487/1980 Professional Traffic Operations Engineer (PTOE) No. 2852/2010 Florida State/FDOT, Certified Public Manager (CPM)/1989 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. De Arazoza experience includes supervising and providing technical guidance and support to transportation planning, roadway design and traffic engineering personnel throughout his career. He provided and continues to provide management and technical support fo r traffic engineering and safety studies, transportation planning, land use planning, including public involvement and coordination with local governments. He provided quality assurance and quality control on all of the above activities. He has worked in both private a nd governmental agencies, including FDOT and Broward County. Mr. De Arazoza has held many high level management positions throughout his career. He is well-versed in traffic engineering and roadway design standards and procedures. 1 9. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) City Center Traffic Impact Study, City of Pembroke Pines, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Manager responsible for the traffic impact study to determine the impact of the vehicular traffic generated from a proposed development project. The scope of work included field reviews, data collection, signal timing, LOS Analysis, Review of Traffic Impacts, and compiling a report. The analyses included eight intersections. Cost/Fees Paid: $57,873.75; Construction Cost: Study. b. (1) TITLE AND LOCATION (City and State) Palmetto Bay Village Center & Old Cutler Bay Road Traffic Study, Miami-Dade County, Florida – Village of Palmetto Bay (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Manager: He was responsible for reviews of the studies to ensure that all pertinent data and analyses complied with applicable standards, policies, procedures and guidelines; such as the latest versions of the Highway Capacity Manual, the Florida Department of Transportation Quality/Level-of-Service Handbook, the Institute of Transportation Engineers Trip Generation 9 th Edition and the Village. RJ Behar performed reviews of the Traffic Impact Study, Traffic Calming Studies, Traffic Operations/Safety Studies, and provided a report with the findings, comments and recommendations. Cost/Fees Paid: $2,920.00; Construction Cost: N/A; Project Length: 41.59 Acres c. (1) TITLE AND LOCATION (City and State) Districtwide Traffic Operations/Safety Studies - Florida Department of Transportation (FDOT), District 6 (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Manager who was responsible for performing traffic operations and safety studies. RJ Behar successfully completed 58 studies, identifying operational and safety improvements, which included Crash Analysis, Highway Lighting Study, Fatal Crash Review, Intersection Safety and Traffic Operations Study, Roadway Lighting Field Inventory, Speed Data Collection, Spot Speed Study and Safe Curve Speed Study, Vehicle Gap Analysis, Traffic Data Collection, Road Safety Audit, Intersection Quality Assessment Study, Intersection Improvements, Traffic Signal Warrant Analysis. Project Cost: TWO varies. d. (1) TITLE AND LOCATION (City and State) I-95 at 6th Avenue Project Development & Environmental (PD&E) Study, Lake Worth, Palm Beach County, Florida – FDOT, District 4 (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Traffic Engineer Task Manager for the IOAR as part of the PD&E study of the Interchange Improvements. The study included traf fic projections, public involvement and included all the ramps within the subject interchange. This IOAR along with the proposed improvements received approval by FDOT Central Office. Project #: 436963-1-22-01 Contract No.: C9N55; Cost/Fees Paid: $786,766.00; Construction Cost: $14,000,000. e. (1) TITLE AND LOCATION (City and State) Traffic Engineering Services and Highway Functional Class; Function Study, Broward County, Florida – City of Miramar (2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Manager responsible for successfully completing a signal warrant study and the Roadway Functional Classification & Jurisdictional Transfers studies for the City as well. Cost/Fees Paid: $30,247; Construction Cost: N/A STANDARD FORM 330 (REV. 8/2016) PAGE 2 Section E - Page | 17 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) 12. NAME HANS MURZI, PE, CFM 13. ROLE IN THIS CONTRACT Drainage Improvements, Stormwater Wells, Pumps, Water Distribution, Wastewater Collection Systems; Environmental Permitting 14. YEARS EXPERIENCE a. TOTAL 18 b. WITH CURRENT FIRM 6 15. FIRM NAME AND LOCATION (City and State) R.J. BEHAR & COMPANY, INC. 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 16. EDUCATION (Degree and Specialization) M.S. Environmental Engineering Florida International University/2002 B.S. Chemical Engineering, University of Los Andes, Merida, Venezuela/2000 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) P.E. Florida License No. 67767/2008 Certified Floodplain Manager Qualified Stormwater Management Inspector 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Murzi is a water resources engineer with experience in hydrologic/hydraulic analysis, rural and roadway drainage design, drainage field inspections, drainage plan reviews and QA/QC of water resources models and drainage reports. He is experienced in several computer programs such as XPSWMM, HEC-RAS, AdICPR, MIKE SHE/MIKE 11, ASAD, ArcGIS. He is also member of the FICE Water Resources Committee. 19. RELEVANT PROJ ECTS a. (1) TITLE AND LOCATION (City and State) Lyons Park Neighborhood Improvement Project, Pompano Beach, Fl orida – City of Pompano Beach (2) YEAR COMPLETED PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Engineer: He is responsible for the preparation of the stormwater design of the proposed improvements. The project area suffers from flooding problems as documented in the City Stormwater Master Plan (SWMP). This project intends to improve the drainage systems within the project area. Cost/Fees Paid: Cost/Fees Paid: $410,000.00; Construction Cost: $10,800,000 (Estimate). b. (1) TITLE AND LOCATION (City and State) Central Broward Water Control District (CBWCD) Engineer Services – Broward County, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm District Engineer responsible for the reviewing plat submittals, paving and grading plans and as-built plans for development permits in the CBWCD. Responsibilities include; ensuring that all site plans comply with CBWCD engineering criteria, review and evaluate requests for variances, provide technical support to CBWCD Board during public hearings for variances request. Site visits are performed as necessary as well as coordination with CBWCD staff in order to ensure that site development requirements are met. Project Length: Not applicable Cost/Fees Paid: $425,948.07 (as 12/20/2019); Construction Cost: Not Applicable. c. (1) TITLE AND LOCATION (City and State) Copans Road Wastewater Transmission System Design, Broward County, Florida – City of Coconut Creek (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) Ongoing (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Manager: He is responsible for the preparation of permit packages, coordination of survey, utility locates (SUE), cost estimates, and specifications. This phase will include a new force main between LS 12 and an existing Broward County 54” diameter force main which conveys flows east along Sample Road to a termination point at the NRWWTP, and a rehabilitation of the force main from LS 12 to the connection from the Wynmoor Community, just west of the Florida Turnpike. Cost/Fees Paid: $88,000; Construction Cost: $3,000,000 (Estimated) d. (1) TITLE AND LOCATION (City and State) Reclaimed Waterline Extension - City of Coconut Creek (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Deputy Project Manager/Project Engineer. He revised the plans and completed the bid packages and permitting for the reclaimed line plans, and specifications. He also provided services during construction, conducted inspections and prepared the Record Drawings. The project consists of the design for approximately 6,900 LF of a 16” diameter reclaimed waterline for connection to a proposed City reclaimed water main (16”) at the southeast corner of Lyons Road and Wiles Road for irrigation of City play fields and green areas . Cost/Fees Paid: $119,650; Construction Cost: $1,385,000 e. (1) TITLE AND LOCATION (City and State) Booster Stations Seawall Repair #1, Miami-Dade County, Florida – Town of Medley (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) 2020 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Engineer responsible for the preparation of the fill and dredge plans and permitting packages for South Florida Water Management District (ERP and ROW) and United States Army Corps of Engineers (Sections 404 and 408). The project included repair of damaged seawalls after hurricane Irma. Cost/Fees Paid: $41,961.37; Construction Cost: $134,248.00 (Estimate). STANDARD FORM 330 (REV. 8/2016) PAGE 2 Section E - Page | 18 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) 12. NAME ELMER CARDENAS, PE, CEI 13. ROLE IN THIS CONTRACT Drainage, Stormwater Wells, Pumps, Water Distribution, Wastewater Collection Systems; Environmental Permitting 14. YEARS EXPERIENCE a. TOTAL 31 b. WITH CURRENT FIRM 6 15. FIRM NAME AND LOCATION (City and State) R.J. BEHAR & COMPANY, INC. 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 16. EDUCATION (Degree and Specialization) M.S. Environmental Engineering, Florida International University/2001 B.S. Civil Engineering, National University of Engineering, Lima, Peru/1984 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) ▪ PE Florida License No. 62988/2005 ▪ Certified Environmental Inspector, Environmental Assessment Association, EA-17007, 09/2018 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) He has extensive experience in environmental engineering and utility projects and has designed and supervised construction of water distribution systems and drinking wells. He has experience with the use of Environmental models: SWMM (stormwater management model), and HSSM (hydrocarbon spill screening model) and hydraulic models AdICPR, ASAD and HEC-RAS. 19. RELEV ANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Lyons Park Neighborhood Improvement Project, Broward County, FL – City of Pompano Beach (2) YEAR COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Engineer for the preparation of the Basis of Design Report (BODR), sanitary sewer design of the wastewater collection system and schematic design of proposed water improvements. The purpose of the proj ect is to improve the drainage system, replace sanitary sewer lines, and replace the water service lines to meet the newer city standards. Services include data collection, utility coordination, permitting, and cost estimating. Cost/Fees Paid: $66,179.71 – Construction Cost: $10,800,000 (Estimate). b. (1) TITLE AND LOCATION (City and State) Gilbert Samson Ocean Front Park, Miami-Dade County, Florida – City of Sunny Isles Beach (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Engineer for the design of the sanitary lift station. Scope of services included the design and permitting of the proposed sewer line and grinder pump on the property, in conjunction with managing all the design aspects of the project. RJ Behar is also responsible for the site geometry, grading, and drainage design. Project Length: 2.09 Acres; Cost/Fees Paid: $362,632; Construction Cost: $3.8 Million. c. (1) TITLE AND LOCATION (City and State) Tressler Street Drainage Improvements, City of North Miami (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Engineer of Record for this project. The improvements included upgrading existing drainage infrastructure by installing exfiltration trenches, solid piping, installation of new catch basin structures with baffles, regrading of swale areas, replacement of existing hand-built catch basins, swale retrofit, and other Best Management Practices (BMPs) along Tressler Street including pervious pavements for swale reconstruction. Project Length: 0.23 miles ± Cost/Fees Paid: $90,949 | Construction Cost: $1,100,000 (Estimated). d. (1) TITLE AND LOCATION (City and State) US-1 Lateral Ditch Restoration, Indian River County, Florida – FDOT, District 4 (2) YEAR COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Engineer: He assisted with the preparation of the permit packages environmental resource permitting and for the wetland impacts. This project included the rehabilitation of 12 outfall ditches in Indian River County. The ditches provide runoff discharge for US-1 and adjacent areas. The purpose of this project was to analyze the existing drainage conditions and re-establish or improve the original design section for each ditch with the goal of restoring adequate drainage along US-1. Project Length: Not Applicable Project #: 431152-1-52-01; Cost/Fees Paid: $336,540; Construction Cost: $1,100,000 (Estimated). e. (1) TITLE AND LOCATION (City and State) Lift Station 107 Rehabilitation, Broward County, Florida – City of Sunrise (2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Engineer for the preparation of the site plans and civil design of the project. The project involved rehabilitating the existing lift station, converting the existing wet pit/dry pit design to a submersible pump configuration and partially filling the existing dry well, converting it to a valve vault. Cost/Fees Paid: $11,697.00; Construction Cost: Unknown. STANDARD FORM 330 (REV. 8/2016) PAGE 2 Section E - Page | 19 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) 12. NAME JOSE A PEÑA-RAMOS, PE 13. ROLE IN THIS CONTRACT Bridges, Structural Systems, Seawall, Buildings, Water & Wastewater Plants, Misc. Structures; Rehabilitation & Strengthening Existing Structures; Threshold Inspections; Cost Estimating 14. YEARS EXPERIENCE a. TOTAL 25 b. WITH CURRENT FIRM 2 15. FIRM NAME AND LOCATION (City and State) R.J. BEHAR & COMPANY, INC. 6861 SW 196th Avenue, Suite 302 Pembroke Pines, Florida 33332 16. EDUCATION (DEGREE AND SPECIALIZATION) M. S. Structural Engineering, Polytechnic University of Puerto Rico, 2012 B. S. Civil Engineering, Polytechnic University of Puerto Rico/1993 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) PE Florida License # 67863 PE Puerto Rico License #15747 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Peña performs structural engineering calculations and reviews structural pl ans. He has worked for the US Department of Urban Development, US Coast Guard, US Army Corps of Engineers, Federal Highway Administration and as a consultant. His experience included Florida and Puerto Rico. He has performed project engineering and structural design and support required for the preparation of plans and specifications for civil works projects including bridges, culverts, pump stations, spillways, retaining walls, and ancillary buildings. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Materials Storage Facility at Water Treatment Plant, Palm Beach County, Florida – Village of Palm Springs (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Structural Engineer of Record: He was responsible for preparing the design for construction plans of a cast in place structure to serve as a material storage facility within the property of the Village of Palm Springs Main Water Plant. Scope of services included site and structural design, cost estimates, specifications. Cost/Fees Paid: $5,370; Construction Cost: $120,000 (Estimate). b. (1) TITLE AND LOCATION (City and State) Paint Two Bridges of Turnpike Main Line over Rim Ditch Canal (C-24) in St. Lucie County, Turnpike Enterprise (2) YEAR COMPLETED PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Structural Engineer of Record in charge of the design for construction plans and specification package to facilitate the repainting of the structural steel components and the recoating of the concrete surfaces of the bridges and adjacent walls located on or over the SR 91 (Florida’s Turnpike) in St. Lucie County. He conducted the field inspection, prepared the inspection reports and is supervising on the plans preparation. Project #:100853; Project Length: .06 Miles; Cost/Fees Paid: $81,125.00; Construction Cost: $986,274.00 (Estimate). c. (1) TITLE AND LOCATION (City and State) Cypress Weir 1 (Gold4A) Relocation Design, Naples, Florida, South Florida Water Management District (2) YEAR COMPLETED PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Structural Engineer of Record in charge of structural and civil design. The project is to relocate Cypress Canal Weir #1 (GOLD4A), in Naples, FL. The new project will include the construction of a new locally and remotely operated water control structure in the new alignment of Cypress Canal, approximately 2000 ft east of the existing weir. The new structure includes a bridge over the Cypress Canal, new gates, control buildings, stilling well platforms on concrete piles and miscellaneous appurtenances. Cost/Fees Paid: $378,925 Construction Cost: $3,000,000 (Estimate). d. (1) TITLE AND LOCATION (City and State) SR 845/Powerline Road at NW 59th Court Intersection, Palm Beach County, Florida – FDOT, District 4 (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 Post Design Ongoing CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Structural Engineer of Record in charge of preparing the design for construction plans for the special foundation for the mast-arm, a multi-post and light pole foundations. Project Length: Intersection. Project #: 441381-1-32-01; Cost/Fees Paid: $189,683.00; Construction Cost: $589,516.59. e. (1) TITLE AND LOCATION (City and State) B 134 Paint Building, Palm Beach County, Florida – SFWMD (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Provided quality control review of structural calculations. RJ Behar provided structural engineering services for the project which included: wind loading calculations on the pre-fabricated building, and foundation calculations and reinforcement design. RJ Behar input will be used in produci ng plans and SFWMD standard specifications will be used to tailor towards this project. RJ Behar provided input in the engineering design report. Cost/Fees Paid: $23,400.00 – Construction Cost: $444,900.00. STANDARD FORM 330 (REV. 8/2016) PAGE 2 Section E - Page | 20 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) 12. NAME JERRY PICCOLO, PE 13. ROLE IN THIS CONTRACT Bridges, Structural Systems, Seawall, Water Plants, Misc. Structures 14. YEARS EXPERIENCE a. TOTAL 45 b. WITH CURRENT FIRM 20 15. FIRM NAME AND LOCATION (City and State) R.J. BEHAR & COMPANY, INC. 12788 Forest Hill Boulevard, Suite 2003B Wellington, FL 33414 16. EDUCATION (DEGREE AND SPECIALIZATION) BS Civil Engineering, University of Florida Graduate Studies, University of Florida 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) P.E. License No. 22979/1980, Florida Certified Bridge Inspector – FDOT & USF, 1982 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) He has a thorough understanding of advanced structural engineering and the associated computer skills. He also has a very practical background in bridge construction and construction contract administration procedures. Mr. Piccolo has been the Project Manager and Engineer-of-Record for numerous, very successful highway and bridge projects over the past 30 years as a consultant. He has also extensive experience in water control structures design and rehabilitation. For the last 15 years, he has provided structural engineering services to the SFWMD for inspection, design, and rehabilitation of water control structures. His services have also included services during construction. He has completed the analysis and rehabilitation of 90% of the SFWMD navigation locks in Florida. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Structural Plans Review Contract – Palm Beach County, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Manager – The scope of this contract included review of the bridge plans, bridge design calculations and bid item quantities. The roadway plans were reviewed to ensure that they were consistent with the bridge plans. One site review was conducted with each review, which focused on existing conditions such as utilities, correct bridge length and location as well as the condition of the existing bridges to be widened. Cost/Fees Paid: Varies b. (1) TITLE AND LOCATION (City and State) Seawall Design at Tobie Wilson Park, Miami-Dade County, Florida – Town of Medley (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Senior Structural Engineer/QC – Structural analysis and design, plans preparation and permitting. The scope of work will include design of approximately 850 feet of a new bulkhead wall located along the south bank of the Miami Canal. Cost/Fees Paid: $112,000 – Construction Cost: $2,800,000 (Estimated). c. (1) TITLE AND LOCATION (City and State) Biscayne Boulevard from 196th Street to 213th Street, Miami-Dade County, Florida – Florida Department of Transportation (FDOT), District 6 (2) YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Structural engineer in charge of design and post design services. The project included five mastarm intersections, and foundations for ground mounted pedestrian signals and flashing lights. Services included milling and resurfacing, pavement widening, median reconstruction, upgrading pedestrian facilities to comply with ADA requirements, signing and pavement markings, bike lane designations, and signalization. Project #: 414624-1-52-01 Project Length: 1.618 miles – Cost/Fees Paid: $228,638.00 - Construction Cost: $3,520,907.11 d. (1) TITLE AND LOCATION (City and State) Hatton Highway Bridge Replacement over the Pahokee Water Control District’s Canal NO. 2 – Palm Beach County, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Structural Engineer responsible for the bridge replacement project Hatton Highway was reconstructed to accommodate the selected bridge replacement. A preliminary alternative analysis was conducted to determine the appropriate roadway section, construction requirements, and limits of work. The bridge design was based on providing a similar 3-span arrangement over the canal, 60’ clearance. The bridge cross section included two 12’ lanes with 8’ shoulders, concrete barriers, and no provisions for sidewalks. Wing walls and slope protection were designed to accommodate the new bridge highway alignment and typical section. The bridge design elements were developed in accordance with the County’s Thoroughfare Road and Bridge Design Procedures. RJ Behar was responsible for all permit coordination on the project. Successful completion of the plans and specifications was achieved with a final score of 97 out of 100. Project Number: 2012515 Project Length: 0.410 miles Cost/Fees Paid: $276,527.55 Construction Cost: $4,000,000.00 (Estimate) Evaluation Grade: 97 e. (1) TITLE AND LOCATION (City and State) Calypso Bay Waterpark Repairs – Palm Beach County, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2014 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Structural Engineer. The scope of services included structural design and construction inspection services. He provided inspection services, also coordinated with the Contractor, park personnel and the County Project Manager. Cost/Fees Paid: $13,800.00; Construction Cost: $200,000.00 STANDARD FORM 330Page 2 Section E - Page | 21 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) 12. NAME RAFAEL E. DROZ, PE 13. ROLE IN THIS CONTRACT Threshold Inspections 14. YEARS EXPERIENCE a. TOTAL 47 b. WITH CURRENT FIRM 10 15. FIRM NAME AND LOCATION (City and State) R.J. BEHAR & COMPANY, INC. 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 16. EDUCATION (Degree and Specialization) ▪ B. S. in Engineering, University of Puerto Rico, Mayaguez 1957 ▪ Continuing Training – OSHA Safety and Construction Management, 2011 ▪ Introduction to Green Building Design, 2008 ▪ Introduction to Florida Building Code, 2007 ▪ Everglades Restoration, 2006 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) State of Florida PE Florida License No. 39228 Florida - Threshold Inspections License No. 843 Puerto Rico PE License No. 3323 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) At RJ Behar, Mr. Droz-Seda performs construction inspections of developments and inspection for infrastructure and building projects. He has over 47 years of building, roadway and site construction supervision experience. He is a structural Threshold Inspector. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Soffits Replacement and T4 Curbside Canopy Inspection Services Broward County Aviation Department (2) YEAR COMPLETED PROFESSIONAL SERVICES 2011 CONSTRUCTION (If applicable) 2011 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Inspector - Structural inspection services for the Soffit Replacement and Terminal Curbside Canopy at Fort Lauderdale Hollywood Internation al Airport. Mr. Droz Seda served as Senior Inspector responsible for inspection services. Project Cost:$1,561,658.00 b. (1) TITLE AND LOCATION (City and State) Peters Elementary School – Threshold Inspection Broward County, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2009 CONSTRUCTION (If applicable) 2010 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Senior Threshold Inspector responsible for all threshold inspections for this cafeteria/auditorium at Peters Elementary Schoo l in Broward County. These inspections included on-site slab pours and all structural elements. Fees Paid: $41,600 / Const. Cost: N/A c. (1) TITLE AND LOCATION (City and State) Countess de Hoernle Park – City of Boca Raton, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION (If applicable) 2012 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Special Structural Inspector for construction of several buildings. The project included two main (2) restroom-vending buildings, dugouts, entry signs, poles and foundations of awnings for tot lots and bleache rs. The scope also included the design of foundations for new mast arms at the intersection with NW Spanish River Boulevard. Cost/Fees Paid: $63,800; Construction Cost: $1.8 Million. c (1) TITLE AND LOCATION (City and State) Public Safety Facility – City of Coral Springs, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2002 CONSTRUCTION (If applicable) 2002 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Special Inspector for a prefabricated building. Scope of services included: Design of the concrete structural foundation and floor slab for the proposed prefabricated storage building. The foundation and slab design were based on a 20 ft. by 55 ft. structural steel building. Prepared of all the civil drawings. Prepared the demolition plan for the proposed improvements. Cost/Fees Paid: $13,000; Construction Cost: $200,000 (Estimated). d. (1) TITLE AND LOCATION (City and State) City of Fort Lauderdale - Ft. Lauderdale, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 1992 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Building Inspector and Engineer for buildings and dock construction. e. (1) TITLE AND LOCATION (City and State) Levitt and Sons - San Juan, Puerto Rico (2) YEAR COMPLETED PROFESSIONAL SERVICES 1975 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Field Engineer in the construction of Housing Developments, Soil Cement and Lime Stabilization Streets Contractor. STANDARD FORM 330 (REV. 8/2016) PAGE 2 Section E - Page | 22 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) 12. NAME CARMELO J. RAMOS, MS, PE 13. ROLE IN THIS CONTRACT Civil, Electrical Engineer, Lighting; Pumps 14. YEARS EXPERIENCE a. TOTAL 12 b. WITH CURRENT FIRM 1 15. FIRM NAME AND LOCATION (City and State) R.J. BEHAR & COMPANY, INC. 6861 SW 196th Avenue, Suite 302 Pembroke Pines, Florida 33332 16. EDUCATION (Degree and Specialization) M.S. Engineering Management, Polytechnic University of Puerto Rico 2012 B.S. Electrical Engineering, Polytechnic University of Puerto Rico 2007 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Florida P.E. License No. 77953 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Ramos is a Senior Electrical Engineer with experience in planning, design, construction, alteration, maintenance, repairs and life cycle support of building assets. He has experience with high voltage power distribution, electrical design for commercial, residential and military facilities. At RJ Behar, he provides support with electrical and lighting design of sites and building facilities. He is proficient in the software skills of IBM Maximo, AutoCAD, Solid Work, Microsoft Office, and multiple Project Management Programs. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Cypress Canal Weir #1 (GOLD4A Relocation Design, Collier County, Florida – South Florida Water Management District (SFWMD) (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) Ongoing (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Senior Electrical Engineer: The new project will include the construction of a new locally and remotely operated water control structure in the new alignment of Cypress Canal, approximately 2,000’ east of the existing weir. Mr. Ramos is in charge of the electrical design for the control building, gates, stilling wells, site, and site illumination. He is assisting with the FP&L coordination, electrical design, electrical elements of the cost estimates and the specifications. Cost/Fees Paid: $378,925 Construction Cost: $3,000,000 b. (1) TITLE AND LOCATION (City and State) Copans Road Wastewater Transmission System Design - City of Coconut Creek (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) Ongoing (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Senior Electrical Engineer. He was responsible for electrical design for the installation of a magnetic flow meter for Lift Station 12. This phase of the project included a new force main between LS 12 and an existing metering station which conveys flows east along Sample Road to a termination point at the NRWWTP, and a rehabilitated force main from LS 12 to the connection from the Wynmoor Community, just west of the Florida Turnpike. Cost/Fees Paid: $88,000; Construction Cost: $3,000,000 (Estimated). c. (1) TITLE AND LOCATION (City and State) Stand-By Generators USCG Housing, Guaynabo, Puerto Rico (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Design Manager for the new USCG Rio Bayamon Housing Stand-By Generators System. Construction Cost $3,000,000. d. (1) TITLE AND LOCATION (City and State) Reverse Osmosis Plant Modernization in the Nuclear Submarine USS West Virginia, Norfolk Virginia (2) YEAR COMPLETED PROFESSIONAL SERVICES 2014 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Design Manager for the reverse osmosis plant modernization in the nuclear submarine USS West Virginia ($4.4M). Project #: N00024-10-G-4304 e. (1) TITLE AND LOCATION (City and State) Hangars Power Distribution, Clearwater, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2011 CONSTRUCTION (If applicable) 2017 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Design Manager for the new USCG Air Station Clearwater Hangars. Construction Cost $2,500,000. STANDARD FORM 330 (REV. 8/2016) PAGE 2 Section E - Page | 23 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME JASMANI RIVERON, MS, PE 13. ROLE IN THIS CONTRACT Roadway, Streetscape, Sidewalks, Parking, Pavement Evaluation & Repairs, SP&M; Utilities 14. YEARS EXPERIENCE a. TOTAL 11 b. WITH CURRENT FIRM 10 15. FIRM NAME AND LOCATION (City and State) R.J. BEHAR & COMPANY, INC. 12788 Forest Hill Boulevard, Suite 2003B Village of Wellington, FL 33414 16. EDUCATION (Degree and Specialization) M.S. Civil Engineering, FIU, Miami, Florida/2009 B.S. Civil Engineering, FIU, Miami, Florida/2008 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) P.E. Florida No. 73798/2011 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Riveron has worked on a 10-story commercial office building, applying for gold LEED certification, oversaw the completion of the project within budget and without scheduling constraints and coordinated the activities of the construction team, architects, engineers and vendors. He has assisted in scheduling and obtaining bids for numerous construction projects, obtained permits and legal documents for various developments. His computer skills are: Proficient in AutoCAD, ArcMap and Microsoft Office and Some basic knowledge of ANSYS, ETABS and MathCad . 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Haverhill Road from Caribbean Boulevard to SR-710 widening, Palm Beach County, Florida - Palm Beach County Department of Engineering & Public Works Division of Roadway Production (PBCDEPWDRP) (2) YEAR COMPLETED PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Engineer responsible for roadway design, permitting, signing and pavement markings, signal modifications, temporary traffic control plans (TTCP), and utility coordination. Project Number: 2013528 Project Length: 1.65 miles; Cost/Fees Paid: $582,734.24 - Construction Cost: $9,000,000 (Estimated) b. (1) TITLE AND LOCATION (City and State) Pompano Beach Mobility Sidewalks, Broward County, Florida – Florida Department of Transportation (FDOT), District 4 (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Manager responsible for preparing roadway, signing and marking plans, and specifications. The scope of this project consists of providing pedestrian sidewalk connectivity along 3 local roads within the City of Pompano Beach. The services include regrading grass swales and minor drainage modifications. Project Length: 046 Miles Project #: 437785-1-32-01; Cost/Fees Paid: $180,430.00; Construction Cost: $ 200,000 (Estimated). c. (1) TITLE AND LOCATION (City and State) Florida Mango Road over PBC L-2 Canal Palm Beach County, Florida – PBCDEPWDRP (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Manager/Engineer of Record for replacement of the Florida Mango Bridge over the L -2 Canal. He was also responsible for the design of the utilities (Water and force main) affected by the bridge replacement. Project #: 22014.001; Cost/Fees Paid: $129,894.89; Construction Cost: $901,590.61 (Estimated) d. (1) TITLE AND LOCATION (City and State) Jog Road Slope Stabilization, Palm Beach County, Florida – PBCDEPWDRP (2) YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Engineer responsible for roadway design, permitting, utility coordination. Services include drainage analysis, structures, cost estimates and post design services. Project Length: 0.372 miles (LF 1,966.43); Project Number: 2014614 Cost/Fees Paid: $94,843.00; Construction Cost: TBD. e. (1) TITLE AND LOCATION (City and State) Reconstruction of SE 3rd Street, Belle Glade, Florida – FDOT, District 4 (2) YEAR COMPLETED PROFESSIONAL SERVICES 2011 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Engineer – He was responsible for the production of roadway plans, utility coordination, signing and pavement marking plans as well as quantities. The scope of this project included roadway plans, drainage design, signing and marking plans, lighting plans, and utility relocation plans. The design included the use of filter fabric and a thick sub-base in lieu of demucking the roadway. The project also included water and sewer plans to be constructed as part of the roadway improvements. Project Number: 426482-1-52-01 Project Start: 1/15/2010 Project Complete:07/2010 (Design); Cost/Fees Paid: $191,203.00 Construction Cost: $1,100,000; Project Length: 0.3 Miles. STANDARD FORM 330 (REV. 8/2016) PAGE 2 Section E - Page | 24 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) 12. NAME NESTOR SANTANA, PE 13. ROLE IN THIS CONTRACT Construction Administration Services & Inspections, Cost Estimates; Structures; Threshold Inspections 14. YEARS EXPERIENCE a. TOTAL 25 b. WITH CURRENT FIRM 3 15. FIRM NAME AND LOCATION (City and State) R. J. BEHAR & COMPANY, INC. 6861 SW 196th Avenue, Suite 302 Pembroke Pines, Florida 33332 16. EDUCATION (DEGREE AND SPECIALIZATION) B.S. Civil Engineering, University of Puerto Rico, 1994 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Florida PE License No. 85785 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Santana has numerous years of experience in construction management for new construction and remedial projects of existing structures for the educational, pharmaceutical, sports & recreation, commercial sectors, and water and wastewater modernization programs. He has been accountable for ensuring quality, safety and schedules according to specifications, reviewing contract plans/specifications covering all building construction and mechanical and electrical installations, and developing preliminary findings on specifications, estimates, and recommendations for contract change orders. His additional training includes AHIT Training; United States Army Corps of Engineers Construction Quality Management for Contractors Training Course; and OSHA 30 Hours, CTQP Final Estimates I&I, QC Manager. 19. RELEVAN T PROJECT S a. (1) TITLE AND LOCATION (City and State) S-151 Structure Replacement and Automation, Broward County, Florida – South Florida Water Management District (SFWMD) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Ongoing (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Construction Manager: He is providing observation and documentation of the construction to ensure the work is performed according to the project drawings and specifications. He supervises construction meetings; reviews shop drawings, RFIs, and coordinates with the DPM. The project consists of the removal of six 7’ x 98’ corrugated metal pipes, construction of four cast in place concrete 8’ wide x 8’ high x 36’ long box culverts with wing walls, stop log recesses, remote controlled stainless steel gates, stilling wells, relocation of existing staff gauges, concrete platforms, LP tank, fencing, gates, new precast control building for system controls and generator. Construction Cost: $5,584,000 b. (1) TITLE AND LOCATION (City and State) Miramar Parkway Streetscape from 68th Avenue to 64th Avenue CEI Services, City of Miramar/FDOT, District 4/Federal Highway Administration (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Ongoing (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Senior Project Engineer assisting the City in complying with all State and Federal Equal Employment Opportunity (EEO) requirements as they apply to this project, including the provisions of the U.S. DOT, the Federal Highway Administration, and the U.S. Department of Labor. He is responsible for all construction inspections, overseeing the resident compliance specialist, and performing project clos e-out. Project Length: 0.58 miles c. (1) TITLE AND LOCATION (City and State) Citywide Pedestrian Safety Project, City of Dania Beach/FDOT/FHWA (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2020 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Senior Project Engineer who is coordinating with and providing FOOT with all the required information to ensure compliance wi th all LAP requirements, oversee the inspection team and the resident compliance specialist, keep the construction contract time established, and perform Final Construction Close-out. Fees Paid: $91,000 Construction Costs: $1,000,000. d. (1) TITLE AND LOCATION (City and State) Riverview Pump Station New Generator, Fire Suppression and Main Switch Disconnect, City of Miami, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Cost Estimator who prepared cost estimates and specifications for the replacement of the Riverview Pump Station Emergency Generator and pumps interconnection in the City of Miami. The pump station is part of the city's stormwater system. The project also includes a subconsultant design of a new Fire Suppressant System and Main Switch Disconnect for the Pump Station. Cost/Fees Paid: $74,200.00; Construction Cost: $935,000 (Estimated) e. (1) TITLE AND LOCATION (City and State) Lakeside Community Hurricane Damage Repair, Miami-Dade County, Florida – Town of Medley (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Cost Estimator who was responsible for the cost data to repair the damaged seawalls due to Hurricane Irma. Erosion control methods, pollution prevention precautions, and earthwork construction are included in the project. He prepared a comprehensive structural assessment report, identifying any seawall deficiencies along the whole perimeter of the Lakeside Community Center. He participated in preparing the FEMA documents required to secure funding for the repairs. Cost/Fees Paid: $83,756; Construction Cost: $1,352,042.00. STANDARD FORM 330 (1/2004) PAGE 2 Section E - Page | 25 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME HECTOR ROSARIO, EI 13. ROLE IN THIS CONTRACT Drainage, Stormwater, Pumps, Water Distribution, Wastewater Collection Systems; Transportation/Traffic 14. YEARS EXPERIENCE a. TOTAL 14 b. WITH CURRENT FIRM 2 15. FIRM NAME AND LOCATION (City and State) R.J. BEHAR & COMPANY, INC. 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 16. EDUCATION (Degree and Specialization) B.S. Civil Engineering, Polytechnic University, Puerto Rico Construction Safety and Health (10 Hrs), OSHA Training Course 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Engineer Intern #: 1100022580, 12/2018 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Rosario is a skilled civil engineer with expertise in all facets of engineering, transportation projects, and constructio n management. He has prepared plans for several projects including resurfacing and lighting retrofit projects. He is knowledgeable regarding the collaboration between all team members in order to achieve a project timeline and the financial goals. He has been instrumental in ensuring the co mpliance of Company practices and OSHA regulations. Mr. Rosario has extensive knowledge of computer based design and project management software applications. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) NE 3rd Avenue from NE 54th St to NE 58th Street Water Line Replacement, Miami- Dade County, Florida – Miami-Dade Water and Sewer Department (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Engineer preparing plans and specifications for design of an 8-inch ductile iron waterline owned by Miami-Dade Water and Sewer Department (WASD) though a Joint Project Agreement with the City. The project included approximately 1,300 linear feet of 8-inch zinc-coated ductile iron pipe and fittings. Project No.: B-50906. Cost/Fees Paid: $25,000 (Water System); Construction Cost: $323,000 (Water System Estimate). b. (1) TITLE AND LOCATION (City and State) Cypress Weir 1 (Gold4A) Relocation Design, South Florida Water Management District (SFWMD) (2) YEAR COMPLETED PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Engineer. He is working on plans preparation for both civil/site and structural plans. The new project will include the construction of a new locally and remotely operated water control structure in the new alignment of Cypress Canal, approximately 2000 ft east of the existing weir. Cost/Fees Paid: $366,700; Construction Cost: $3,200,000 (Estimated). c. (1) TITLE AND LOCATION (City and State) Copans Road Wastewater Transmission System Design - City of Coconut Creek, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) Ongoing (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Engineer. He is worked on plans preparation for the wastewater lines and the civil and electrical plans for installation of a new magmeter. This phase included a new force main between LS 12 and an e xisting metering station which conveys flows east along Sample Road to a termination point at the NRWWTP, and a rehabilitated force main from LS 12 to the connection from the Wynmoor Commu nity, just west of the Florida Turnpike. Cost/Fees Paid: $88,000; Construction Cost: $3,000,000 (Estimated). d. (1) TITLE AND LOCATION (City and State) Oakhill Culvert Replacement, Broward County, Florida – Town of Davie (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Engineer who assisted with the design and plans preparation, including quantities and cost estimates. The project consisted of the coordination, design, permitting, and bidding assistance for the replacement of a culvert bridge in the Oakhill neighborhood. Cost/Fees Paid: $29,953; Construction Cost: $90,000 (Estimate). e. (1) TITLE AND LOCATION (City and State) City Center Traffic Impact Study, City of Pembroke Pines, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Engineer. He was responsible for data collection. The scope of services of the study included performed field reviews, signal timing, LOS Analysis, Review of Traffic Impacts, and compiling a report. The analyses included eight intersections. Cost/Fees Paid: $57,873.75; Construction Cost: Study Only. STANDARD FORM 330 (REV. 8/2016) PAGE 2 Section E - Page | 26 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) 12. NAME MICHELLE LEON, EI 13. ROLE IN THIS CONTRACT Traffic Engineering & Studies; Construction Administration Services and Inspections. 14. YEARS EXPERIENCE a. TOTAL 7 b. WITH CURRENT FIRM 6 15. FIRM NAME AND LOCATION (City and State) R.J. BEHAR & COMPANY, INC. 6861 SW 196th Avenue, Suite 302 Pembroke Pines, Florida 33332 16. EDUCATION (Degree and Specialization) B.S. Civil Engineering, Florida International University/ 2012 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Engineer Intern #: 1100019645, 2016 Certifications: TIN #: C440540877610 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) CERTIFICATIONS: TIN #: L500540877610 ▪ Earth Work I & II ▪ Asphalt Paving Level I & II ▪ Asphalt Plant I ▪ Final Estimates I & II ▪ Pile Driving Inspector ▪ Drilled Shaft Inspector ▪ FDOT Concrete Field Technician Level 1 ▪ ACI Concrete Field Technician ▪ Stormwater Erosion Sedimentation Control ▪ US DOT Hazmat Certification Class ▪ APNGA Portable Nuclear Gauge ▪ FDOT Critical Structures ▪ FDOT MSE Wall ▪ Advanced Maintenance of Traffic 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) City Center and Traffic Signals Warrant Analysis – City of Pembroke Pines, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Engineer: She performed the traffic counts including turning movements counts. The objective of this traffic study was to determine the impact of the vehicular traffic generated from the proposed development project. The traffic analyses focused on determining the effects in a 2- year projection time period and assessed the existing and future conditions with and without the project’s generated vehicular traffic. Th e scope of work included traffic data collection, trip generation analysis, trip distribution, trip assignment, crash history and capacity/level -of-service (LOS) analyses. Cost/Fees Paid: $57,873.75; Construction Cost: Study b. (1) TITLE AND LOCATION (City and State) Gilbert Samson Ocean Front Park, Miami-Dade County, Florida – City of Sunny Isles Beach (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2017 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Construction Inspector/Resident Project Representative: She was responsible for overseeing the construction of a sanitary sewer grinder pump with connection to Dade County Facilities and new driveway access from a Florida Department of Transportation road, Collins Avenue. The project also included architectural plans for the addition of two bathroom stalls, full plumbing and electrical upgrades. She was also responsible for overseeing the landscaping in the park, including a new stage installed on the site. The project also included all new exterior and interior lighting. Cost/Fees Paid: $141,478.00 Construction Cost: $3 million; Project Length: 2.9 acres. c. (1) TITLE AND LOCATION (City and State) Waterline Design along NE16th Avenue, NE 146th Street and NE 18th Avenue, Miami-Dade County, Florida – City of North Miami (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Engineer: She conducted inspections and closing out of the project during construction for the water line installation. The project includes approximately 3,255 ft of new 16-inch DIP water line. Cost/Fees Paid: $87,600.00; Construction Cost: $904,352.00 d. (1) TITLE AND LOCATION (City and State) ITS Shelters Homestead Construction CMS, Miami-Dade County, FL – South Florida Water Management District (SFWMD) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2019 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Inspector: She was responsible for providing construction management and inspection support, including performing field inspections of the construction effort to verify conformance to the contract plans and specifications; preparing daily reports documenting construction performance and inspections; photographing documentation of construction activities on a daily basis; attending progress meet ings; coordinating and handling of submittals and requests for Information (RFIs) with the DCM as necessary; performing field inspections to review and verify environmental protection measures installed by the Construction Contractor are complying with regulatory requirements; verifying the Construction Contractor work performed and documented in Construction Contractor payment applications; and coordinating all the materials testing during the construction. Cost/Fees Paid: $105,300.00 Construction Cost: $1,328,000.00 e. (1) TITLE AND LOCATION (City and State) NW 35th Avenue Greenway Enhancement, Broward County, F lorida – City of Lauderhill (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2018 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Inspector: She was responsible for providing construction engineering and inspection support services for conversion of a jogging path to a Greenway. The project included construction of decorative edge treatment bounding both sides of the greenway, seven asphalt connections to the existing path, signing and pavement marking improvements for bicycle traffic, landscaping, and pedestrian lighting. Cost/Fees Paid: $106,989.00 Construction Cost: $599,982.00 Project #: 431710-1-58-01 Project Length: 0.569 miles STANDARD FORM 330 (REV. 8/2016) PAGE 2 Section E - Page | 27 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) 12. NAME JOSSMEL CRUZ-GARCIA, MS, EI 13. ROLE IN THIS CONTRACT Bridges, Seawall Structures, Buildings, Water & Wastewater Plants, Structures 14. YEARS EXPERIENCE a. TOTAL 3 b. WITH CURRENT FIRM 3 15. FIRM NAME AND LOCATION (City and State) R.J. BEHAR & COMPANY, INC. 6861 SW 196th Avenue, Suite 302 Pembroke Pines, Florida 33332 16. EDUCATION (Degree and Specialization) M.E. Structural Engineering, University of Puerto Rico, July 16, 2017 B.S. Civil Engineering, University of Puerto Rico, June 2015 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Engineer Intern #: 1100023398, 2019 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) At RJ Behar, he works in the design of structural elements and performs construction inspections of infrastructure and building projects. He is proficient in MathCAD and has a thorough understanding of advanced structural engineering and the associated computer skills. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) SR 25/Okeechobee Road from W. 7th Avenue to NW 36th Street, Miami-Dade County, Florida – FDOT, District 6 (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) 2020 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Structural Engineer: As part of the post-design services, he was responsible for reviewing the mast arm and overhead cantilever sign shop drawings; reviewing the mast arm design calculations shop drawings; reviewed the cantilever sign foundation shop drawings; reviewed the multi- post foundation shop drawings; designed spread footings for the light pole; and performed the structural designed of the barrier wall for pier protection. Project Length: 1.1 miles; Project #: 425979-2-32-01; Cost/Fees Paid: $524,942.00; Construction Cost: 1,680,000.00 b. (1) TITLE AND LOCATION (City and State) S-40, S41 and S-44 Gate Replacements and Concrete Repairs, South Florida Water Management District (2) YEAR COMPLETED PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Structural Project Engineer in charge of the update to the design of the structural elements. The project consists of the design, fabrication and installation of new stainless steel vertical lift roller gates and frames for coastal structures S-40, S-41 and S-44; replacing the existing hydraulic hoist systems to a new cable (rope) drum hoist system for structures S-40 and S-41; furnishing and installing riprap at the embankments for structures S-40, S-41 and S-44; and to address civil/structural/mechanical/electrical deficiencies. Work Order: 4600003087-WO2 Cost/Fees Paid: $315,550 - Construction Cost: $8,500,000 (Estimated). c. (1) TITLE AND LOCATION (City and State) Florida Mango Road over PBC L-2 Canal, Palm Beach County, Florida – Palm Beach County Roadway Division (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Structural Engineer who performed the structural calculations for the culvert end walls design and prepared the plans. Scope of services included drainage design, roadway improvements, force main & water main design, pavements marking and signing, and permitting. RJ Behar also coordinated the plans with the City of West Palm beach and obtained the Health Department permits for all relocated utilities. Cost/Fees Paid: $129, 894.89; Construction Cost: $901,590.61 (Estimated). d. (1) TITLE AND LOCATION (City and State) Booster Stations Seawall Repair #1, Miami-Dade County, Florida – Town of Medley (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) 2020 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Structural Lead Engineer for designing rows of pre-stressed soil anchors (or similar drilled-in tiebacks) to provide horizontal resistance for the upper portion of an existing seawall. The repair will run the full length of the south pump station seawall plus roughly 10’ on each side of the pump station building. Structural design of the wall will follow the requirements and recommendations of the Florida De partment of Transportation Structure Design Guidelines, dated January 2016, Chapter 3 for Retaining Walls. Wall design calculations, assumptions, etc., will be documented in a computation book report. He is also responsible for assisting with hydraulic calculations, estimates of probable cost and permitting. Cost/Fees Paid: $41,961.37 – Construction Cost: N/A. e. (1) TITLE AND LOCATION (City and State) B 134 Paint Building, Palm Beach County, Florida – South Florida Water Management District (SFWMD) (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Structural Designer. He provided structural engineering services for the project which included wind loading calculations on the prefabricated building, foundation calculations and reinforcement design. This input will be used in producing plans and SFWMD standard specifications will be used to tailor towards this project. RJ Behar provided input in the engineering design report. Project #: 101095; Cost/Fees Paid: $23,400; Construction Cost: $543,136. STANDARD FORM 330 (REV. 8/2016) PAGE 2 Section E - Page | 28 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) 12. NAME JOYCE LEDAN, EI 13. ROLE IN THIS CONTRACT Civil/Site Design, Parks; Drainage Improvements, Stormwater, Pumps, Water & Sewer 14. YEARS EXPERIENCE a. TOTAL 3 b. WITH CURRENT FIRM 1 15. FIRM NAME AND LOCATION (City and State) R.J. BEHAR & COMPANY, INC. 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 16. EDUCATION (Degree and Specialization) B.S. in Engineering, Florida Atlantic University, August 2019 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Engineer Intern #: 1100023421, 2020 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Ledan is a young engineer currently working in design and plans preparation for miscellaneous civil engineering projects. She is proficient in Microsoft Project, AutoCAD Civil3D, and Microstation. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Charles Avenue from SW 37th Avenue to Main Highway, Miami-Dade County, Florida – City of Miami (2) YEAR COMPLETED PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Designer who is assisting with the plans preparation for the engineering services including milling & resurfacing, localized drainage improvements, ADA upgrades, utility coordination, permitting, signing and pavement marking. Project #: B-183612 Project Length: 0.542 miles; Cost/Fees Paid: $93,396.21; Construction Cost: $1,029,528.51 (Estimate). b. (1) TITLE AND LOCATION (City and State) Lyons Park Neighborhood Improvement Project – Final Design, Broward County, Florida – City of Pompano Beach (2) YEAR COMPLETED PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Designer was responsible for assisting with the plan’s preparation of the stormwater design of the proposed improvements. The project area suffers from flooding problems as documented in the City Stormwater Master Plan (SWMP). This project intends to improve the drainage systems within the project area. Cost/Fees Paid: $410,000.00; Construction Cost: $10,800,000 (Estimate). c. (1) TITLE AND LOCATION (City and State) SW 136th Street from US-1 to Old Cutler Road, Miami-Dade County, Florida – Village of Palmetto Bay (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Designer: She assisted with plans preparation, drainage design plans and calculations. Scope of services includes project management, roadway analysis and plans, signing and pavement marking, permitting, utility coordination, and civil engineering services necessary for roadway and drainage improvements. She also attending the Public Meeting. The primary challenge for this project was accommodating the proposed sidewalks and bicycle lanes in a right of way constrained corridor. Cost/Fees Paid: $193,171.00; Construction Cost: $1,700,345.00 (Estimated); Project Length: 1.75 Miles. d. (1) TITLE AND LOCATION (City and State) 45 Year Community Development Block Grant, NW 7th Avenue and 3rd Court Drainage, Broward County, Florida – City of Hallandale Beach (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Engineer: was responsible for preparing the plans for roadway and drainage improvements. The project utilizes French drains to improve flooding conditions within the neighborhood. Cost/Fees Paid: $32,000; Construction Cost: $177,000. e. (1) TITLE AND LOCATION (City and State) Russian Colony and Seawall Expansion Programming Documents, Miami-Dade County, Florida – Town of Medley (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Designer who is assisting with the plans preparation for the roadway reconstruction, one signal modification, a new drainage system, lighting, utility coordination, signing and pavement marking, and permitting. Cost/Fees Paid: $101,292.00 ; Construction Cost: $9,915,988.85 (Engineer’s Probable Cost). STANDARD FORM 330 (REV. 8/2016) PAGE 2 Section E - Page | 29 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME XAMARAH SEDA-VELEZ, MS 13. ROLE IN THIS CONTRACT Roadway, Streetscape, Sidewalks, Parking, Pavement Evaluation & Repairs, SP&M; Utilities; Civil, Parks, Drainage, Stormwater, Pumps, Water & Sewer 14. YEARS EXPERIENCE a. TOTAL 3 b. WITH CURRENT FIRM 2 15. FIRM NAME AND LOCATION (City and State) R.J. BEHAR & COMPANY, INC. 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 16. EDUCATION (Degree and Specialization) M.S. Engineering Management, Polytechnic University of Puerto Rico, 2018 B.S. Civil Engineering, University of Puerto Rico, Mayagüez, 2015 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Ms. Seda-Velez is a young engineer currently working in design and plans preparation for miscellaneous civil engineering projects . She has experience with inspection and evaluation of structures. She is proficient in Microsoft Office Suite, Microsoft Project, AutoCAD Civil3D, Sketchup, Synchro, Primavera, VBA, Minitab17 and SAP2000. 1 9. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Charles Avenue from Main Highway to South Douglas Road, Miami-Dade County, Florida – City of Miami (2) YEAR COMPLETED PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Designer: She assisted with plans preparation, drainage design plans and calculations. Scope of services includes project management, investigation, roadway analysis and plans, signing and pavement marking, permitting, utility coordination, and civil engineering services necessary for roadway and drainage improvements. Project #: B-183612 Project Length: 0.542 miles Cost/Fees Paid: $93,396.21; Construction Cost: $1,029,528.51 (Estimate). b. (1) TITLE AND LOCATION (City and State) SW 34 Avenue and SW 28 Street Intersection Improvements Project, Miami- Dade County, Florida – City of Miami (2) YEAR COMPLETED PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Designer: She is assisting with plans preparation, drainage design plans and calculations. The project scope of services includes roadway milling and resurfacing, localized drainage improvements, ADA ramps where applicable, new sidewalk where required and new signing and pavement markings, utility coordination, and environmental permitting. Project #: B-173611; Project Length: 0.118 miles Cost/Fees Paid: $33,088.95; Construction Cost:$162,784.17 (Estimated) c. (1) TITLE AND LOCATION (City and State) SW 35th Avenue from SW 29th Street to SW 28th Street Roadway Improvements Project, Miami-Dade County, Florida – City of Miami (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Designer: She is assisting with plans preparation, drainage design plans and calculations. The project scope of services included roadway milling and resurfacing, localized drainage improvements, ADA ramps where applicable, new sidewalk where required and ne w signing and pavement markings, utility coordination, and environmental permitting. Project #: B173610; Project Length: 0.117 Miles Cost/Fees Paid: $40,908.00; Construction Cost: $216,142.20 (Estimate). d. (1) TITLE AND LOCATION (City and State) NW 21st Court from NW 36th Street to NW 38th Street Roadway Improvements Project, Miami-Dade County, Florida – City of Miami (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Designer: She assisted with plans preparation, drainage design plans and calculations. The project scope of services include d roadway milling and resurfacing, localized drainage improvements, replacement of damaged sidewalks and driveway approaches, ADA ramps where applicable, new sidewalk where required and new signing & pavement markings, utility coordination, environmental permitting. Project #: B-50113; Project Length: 0.014 miles; Cost/Fees Paid: $33,894.15; Construction Cost: $300,401.64 (Estimate) e. (1) TITLE AND LOCATION (City and State) NW 102nd Avenue from NW 138th Street to NW 142nd Street, Miami-Dade County – City of Hialeah, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Designer. She is responsible for drainage design plans, signing and pavement marking plans, and cross sections. The scope of services for the improvements includes roadway plans, signing and pavement marking plans, drainage report and estimates of probable of construction cost. Cost/Fees Paid: $108,206.00; Construction Cost: $1,146,340; Project Length: 0.269 Miles. STANDARD FORM 330 (REV. 8/2016) PAGE 2 Section E - Page | 30 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) 12. NAME ANGEL MARINEZ 13. ROLE IN THIS CONTRACT Engineer Designer / Roadway Improvements, Streetscape, Sidewalks, Parking, Pavement Evaluation, SP&M 14. YEARS EXPERIENCE a. TOTAL 1 b. WITH CURRENT FIRM 1 15. FIRM NAME AND LOCATION (City and State) R.J. BEHAR & COMPANY, INC. 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 16. EDUCATION (Degree and Specialization) B.S. in Engineering, Florida Atlantic University, August 2019 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Marinez is a young engineer currently working in design and plans preparation for miscellaneous civil engineering projects. He has experience with inspection. He is proficient in Microsoft Project, AutoCAD Civil3D, and Microstation. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) SR 25/Okeechobee Road from W. 7th Avenue to NW 36th Street, Miami-Dade County, Florida – Florida Department of Transportation (FDOT), District 6 (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) 2020 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Designer for the milling and resurfacing, intersection island modifications and removals, upgrading pedestrian facilities to comply with ADA requirements, guardrail upgrades, signalization improvements, new signing and pavement markings, and bridge railing upgrades. The project scope also includes the addition of paved shoulders along both sides and culvert relocation at Frontage Road. Project Length: 1.05 miles FPID: 425979-2-52-01; Cost/Fees Paid: $524,942.00; Construction Cost: 1,680,000.00. b. (1) TITLE AND LOCATION (City and State) I-95 at 6th Avenue Final Design, Palm Beach County, Florida – FDOT District 4 (2) YEAR COMPLETED PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Designer who is assisting with the plans preparation for interchange improvements, which includes a Level IV CAP, six typical sections, pavement design, access management, TCP plans, temporary lighting on all ramps, drainage, utility coordination, Environmental Permits, signing and marking plans, signalization and complete management of all subconsultants. The project also includes milling and resurfacing, adding bike lines, upgrading roadway signs and curb ramps to meet the current ADA standards, adding exclusive right turn lanes, and modifications to existing CSX tracks and overhead railroad structure. Project #: 436963-1-32-01; Cost/Fees Paid: $750,000.00; Construction Cost: $TBD; Project Length: Interchange. c. (1) TITLE AND LOCATION (City and State) NW 102nd Avenue from NW 138th Street to NW 142nd Street, Miami-Dade County, Florida – City of Hialeah (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Designer who is assisting with the plans preparation for the roadway reconstruction, one signal modification, a new drainage system, lighting, utility coordination, signing and pavement marking, and permitting. Cost/Fees Paid: $108,206.00; Construction Cost: $1,146,340.00; Project Length: 0.269 Miles d. (1) TITLE AND LOCATION (City and State) SW 136th Street from US-1 to Old Cutler Road, Miami-Dade County, Florida – Village of Palmetto Bay (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Designer: He prepared the roadway design and geometrics, pavement signing and markings, assisted with the quantities for the asphalt. He quantified the impervious and pervious areas for post and predevelopment. The project involves roadway plans, pavement marking and signing plans, utility coordination, drainage design and permitting. The improvements will require milling and resurfacing of the existing roadway and pavement widening to accommodate an on-road dedicated bicycle lane. The primary challenge for this project is accommodating the proposed sidewalks and bicycle lanes in a right-of-way constrained corridor. Cost/Fees Paid: $193,171.00; Construction Cost: $1,700,345.00 (Estimated); Project Length: 1.75 Miles. e. (1) TITLE AND LOCATION (City and State) Cypress Weir (GOLD4A) Relocation Design, Palm Beach County, Florida – SFWMD (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) Ongoing (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Designer who is assisting with the plans preparation for a new project will include the construction of a new locally and remotely operated water control structure in the new alignment of Cypress Canal, approximately 2000 ft east of the existing weir. Cost/Fees Paid: $366,700; Construction Cost: $3,200,000 (Estimated) STANDARD FORM 330 (REV. 8/2016) PAGE 2 Section E - Page | 31 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person) 12. NAME NANETTE AKYAZ-GOMEZ 13. ROLE IN THIS CONTRACT CAD - Roadway, Streets Design Sidewalks, Parking, SP&M; Civil/Site, Parks, Lighting; Drainage, Stormwater, Water, Wastewater 14. YEARS EXPERIENCE a. TOTAL 20 b. WITH CURRENT FIRM 18 15. FIRM NAME AND LOCATION (City and State) R. J. BEHAR & COMPANY, INC. 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 16. EDUCATION (Degree and Specialization) A.A. Degree/Broward Community College/1992 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) N/A 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) At RJ Behar, Ms. Akyaz is responsible for plans preparation in both MicroStation and CAD software for roadway and civil engineering projects. Her certifications include FDOT CAD Update Training Seminar, FDOT PPM Design Update Training, AutoCAD Release 12 - Florida International University, FDOT/FICE - Load and Resistance Factor Design (LRFD) Training, Geopak Road 1 Training. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Haverhill Road from N. of Caribbean Boulevard to Bee Line Highway, Palm Beach County, FL - Palm Beach County (2) YEAR COMPLETED PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Designer: She is responsible for roadway design plans. The scope of services includes drainage improvements , signalization, pavement and marking, Temporary Traffic Control Plans (TTCP), utility coordination and permitting. Project Length: 1.65 miles Cost/Fees Paid: $582,734.24 - Construction Cost: $9,000,000 (Estimated) b. (1) TITLE AND LOCATION (City and State) NE 151st Street Improvements, Miami-Dade County, Florida – Oleta Partners LLC/Miami-Dade County (2) YEAR COMPLETED PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Designer. She is responsible for roadway design plans. The scope of the project included roadway design, Temporary Traffic Control Plan (TCP) design, pavement marking and signing, signalization, lighting, drainage and permitting, utility coordination, contamination assessment and wetland delineation/assessment. Project #: N/A; Cost/Fees Paid: $498,000.00; Construction Cost: $5,757,000; Project Length: 0.876 miles. c. (1) TITLE AND LOCATION (City and State) NW 87th Avenue, Miami-Dade County, Florida – Florida Department of Transportation (FDOT), District 6 (2) YEAR COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) 2019 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Roadway Designer: She assisted with roadway design and was responsible for quantities. The scope of services for this project includes Roadway/Traffic Control Plan (TCP) design, pavement marking and signing, signalization, lighting, drainage and permitting, bridge construction, utility coordination, traffic study, traffic counts, traffic projections, and traffic warrants services. Project No.: 405615-3-52-01 Project Length: 1.90 miles; Cost/Fees Paid: $2,994,823.00; Construction Cost: $34,800,000 (Estimated) d. (1) TITLE AND LOCATION (City and State) SR-5/US-1/Biscayne Boulevard Resurfacing from NE 199th Street to NW 213th Street, Miami-Dade County, Florida – FDOT, District 6 (2) YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Designer responsible for the production of the roadway plans. The scope of services includes milling and resurfacing, signing and pavement markings, traffic control plans and ADA and pedestrian features upgrades. Project Length: 1.2 miles Project No.: 414624-3-32-01; Cost/Fees Paid: $228,638; Construction Cost: $3,520,907.11 e. (1) TITLE AND LOCATION (City and State) Design/Build for the Reconstruction of SE 3rd Street, Belle Glade, Florida – FDOT, District 4 (2) YEAR COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION (If applicable) 2013 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Project Designer: She was responsible for the production of roadway plans, signing and pavement marking plans and quantities. The scope of this project included roadway plans, drainage design, signing and marking plans and utility relocation pl ans. The design included the use of filter fabric and a thick sub-base in lieu of demucking the roadway. Project No.: 426482-1-52-01 Project Start: 1/15/2010 Project Complete: 9/30/2013 Project Length: 0.3 miles. STANDARD FORM 330 (REV. 8/2016) PAGE 2 Section E - Page | 32 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME JAIME DELGADO 13. ROLE IN THIS CONTRACT Utility Coordinator, Traffic Data Collection 14. YEARS EXPERIENCE a. TOTAL 2 b. WITH CURRENT FIRM 2 15. FIRM NAME AND LOCATION (City and State) R.J. BEHAR & COMPANY, INC. 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 16. EDUCATION (Degree and Specialization) B.S. Graphic Design, Corporación Universitaria Taller Cin, Colombia, 1989 - 1993 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) He is responsible for locating, contacting, and organizing all of the Utility Owner’s on the project. He is fluent in MicroStation and AutoCAD. He also performs graphic design. Additionally, he has been involved in traffic studies including 24 hour counts and turning movement counts. 1 9. RELEVANT PROJEC TS a. (1) TITLE AND LOCATION (City and State) Fiber Optic Communication Cable for Various Locations, Broward County, Florida – FDOT, District 4 (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2019 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Utility Coordinator: He was responsible for starting a Sunshine Ticket to identify the Utility Owner’s within the project limits. He then sent out notification letters, contacted all utilities, sent plans, followed up with all of the owner’s and then presented the locates to the designing engineer. b. (1) TITLE AND LOCATION (City and State) NW 21st Court from NW 36th Street to NW 38th Street, Miami-Dade County, Florida – City of Miami (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Utility Coordinator: He was responsible for starting a Sunshine Ticket to identify the Utility Owner’s within the project limits. He then sent out notification letters, contacted all utilities, sent plans, followed up with all of the owner’s and then presented the locates to the designing engineer. c. (1) TITLE AND LOCATION (City and State) Charles Avenue from SW 37th Avenue to Main Highway, Miami-Dade County, Florida – City of Miami (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2020 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Utility Coordinator: He was responsible for starting a Sunshine Ticket to identify the Utility Owner’s within the project limits. He then sent out notification letters, contacted all utilities, sent plans, followed up with all of the owner’s and then presented the locates to the designing engineer. d. (1) TITLE AND LOCATION (City and State) Emergency Operations Center (EOC) Broward County – Traffic Study – Broward County HCDE (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2019 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Data Collection Technician: He performed the traffic counts including turning movements counts at the following locations: Pine Island Road and County Campus Boulevard; NW 84th Avenue and County Campus Boulevard; and County Campus Boulevard at the entrance to Broward County EOC. e. (1) TITLE AND LOCATION (City and State) City Center and Traffic Signals Warrant Analysis – City of Pembroke Pines, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2020 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Data Collection Technician: He performed the traffic counts including turning movements counts. STANDARD FORM 330 (REV. 8/2016) PAGE 2 Section E - Page | 33 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME ALEJANDRO MEDINA 13. ROLE IN THIS CONTRACT Senior Inspector/Construction Administration Services and Inspections 14. YEARS EXPERIENCE a. TOTAL 35 b. WITH CURRENT FIRM 3 15. FIRM NAME AND LOCATION (City and State) R.J. BEHAR & COMPANY, INC. 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 16. EDUCATION (Degree and Specialization) ▪ Degree in Engineering Public Works Constructions, Technical University of Madrid, Spain, Sept 2007 ▪ Degree in Civil Engineer, IPJAE, Cuba, June 1981 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) CERTIFICATIONS: TIN #: M352010561001 Advanced Maintenance of Traffic, Asphalt Paving I & II, Earthwork I & II, Drilled Shaft, FDOT Concrete Level I, ACI Concrete Field Technician, FDOT Critical Structures, APNGA Portable Nuclear Gauge Safety & Hazmat Certification, IMSA Traffic Signal Technician I 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Seawall Design at Tobie Wilson Park, Miami-Dade County, Florida – Town of Medley (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2020 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Senior Inspector who assisted with the construction inspection of the seawall. The scope of work will include construction of approximately 850 feet of a new bulkhead wall located along the south bank of the Miami Canal. Project Length: 850’ Cost/Fees Paid: $112,000; Construction Cost: $1,394,664 b. (1) TITLE AND LOCATION (City and State) Landscape Median Project CEI Services, Broward County, Florida – City of Tamarac (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2019 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Senior Inspector in charge of overseeing the construction of the landscape project. He was responsible for producing daily r eports, attending meetings, verifying that the Contractor was building the project according to the correct specifications. The scope included additional tree planting, removal of old irrigation and replacement with new irrigation. Cost/Fees Paid: $52,976.00 Construction Cost: $391,591.37 c. (1) TITLE AND LOCATION (City and State) Pump Stations D-10 and D-11 Construction Inspection, Broward County, Florida – City of Ft. Lauderdale (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2019 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Senior Inspector: He was responsible for overseeing the Contractors work, maintained accurate daily records, monitored the Maintenance of Traffic (MOT), prepared a punchlist and provided it to the City, verified substantial completion and that the project was built satisfactorily, provided all reports and deliverables. This project consisted of rehabilitating the City of Fort Lauderdale’s sewage pumping Stations D-10 and D-11 and associated wastewater system components. The work consisted of demolishing and removing existing structures, piping and equipment; cleaning, rehabilitating, and painting existing structures; construction of new gravity sanitary sewers, manhole and a valve vault; installation of new submersible sewage pumps, piping, appurtenances; electrical and control systems; and all restoration. Project Length: N/A Project #. 12202; Cost/Fees: $ 113,692.46; Construction Cost: $1.5 million. d. (1) TITLE AND LOCATION (City and State) Wiles Road from West of Rock Island Road to SR-7/US-441, Broward County, Florida – Broward County Highway Construction & Engineering (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2019 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Roadway Inspector. He started on the project on 10/2018 to assist with the final inspections and close out of the proj ect. He was responsible for daily inspections; daily inspections of MOT lane closures and MOT devices; documenting field changes from utility conflicts; conducting routine daily field inspections of overall work progress throughout project limits; and per forming daily inspections of erosion control devices. Cost/Fees Paid: $1,066,478.77 Construction Cost: $10,632,710.79 e. (1) TITLE AND LOCATION (City and State) Miami Dade County Drainage Projects, Miami-Dade County, Florida – Miami- Dade County Department of Transportation and Public Works (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2017 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Construction Inspector responsible for maintaining complete and accurate records of all activities and events related to the project; keeping the daily project journal, including maintaining accurate records of the contractor's operations, quantities installed, sampling and testing data, project photo and video documentation; properly documenting all significant Project changes; interpreting plans, specifications, and construction contract provisions; reviewing and keeping project as-builts current and up to date, making recommendations to the County to resolve disputes; and assisting with the project closeout. Varied; Cost/Fees Paid: $200,000; Construction Cost: $2,000,000 (Estimated). STANDARD FORM 330 (REV. 8/2016) PAGE 2 Section E - Page | 34 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME LOGAN FASANELLA 13. ROLE IN THIS CONTRACT Construction Senior Inspector, Traffic Data 14. YEARS EXPERIENCE a. TOTAL 8 b. WITH CURRENT FIRM 6 15. FIRM NAME AND LOCATION (City and State) R.J. BEHAR & COMPANY, INC. 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 16. EDUCATION (Degree and Specialization) A.A. Culinary, Art Institute of Tampa, Tampa, Florida 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) TIN #: F254533883350 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) CERTIFICATIONS: Advanced Maintenance of Traffic; Earthwork Construction Inspection I & II; Asphalt Paving Technician Level I & II; FDOT Critical Structures Construction Issues; FDOT Concrete Field Technician Level 1; Pile Driving; Drilled Shaft Inspector; Storm water Erosion Sedimentation Control Inspector; Final Estimates Level I & II; Hazmat/Nuclear Radiation; FDOT MSE Walls Certification; FDOT Wage and Labor Training; CSX Roadway Worker Protection; MAC Computer-Based Training, IMSA Traffic Signal Inspector Level I, IMSA Traffic Signal Technician Level I, Post Tensioning/Grouting – Scheduled 3/2020 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Nova Drive Construction Engineering and Inspection (CEI) Services, Broward County, Florida – Town of Davie (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2020 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Senior Inspector responsible for overseeing the MOT schemes and devices in work zones; monitoring the Contractor’s work and assuring that the Contractor is conducting inspections, preparing reports, and monitoring all stormwater pollution prevention measures associated with the project; reviewing and monitoring compliance with drawings, contract documents, and technical specifications; maintaining complete and accurate records of all activities and events relating to the Project; properly documenting all significant Project changes; inter preting plans, specifications, and construction contract provisions; and maintaining an adequate level of surveillance of the Contractor’s activities. Project Length: 1.29 miles; Project #: B-17-151; Cost/Fees Paid: $496,280; Construction Cost: $6,425,430 b. (1) TITLE AND LOCATION (City and State) Davie Road Phase II Local Agency Program (LAP) CEI Services, Town of Davie/Florida Department of Transportation (FDOT), District 4/Broward County (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2018 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Senior Inspector who performed daily inspections, produced weekly reports, monitored the contractor’s pay items, attended progress meetings, monitored shop drawings and RFIs, performed Temporary Traffic Control Plan Reviews including the coordination of lane closures, and conducted the material sample reviews. Cost/Fees Paid: $297,438.25 - Construction Cost: $2,433,873.04 Project Length: 0.89 miles. c. (1) TITLE AND LOCATION (City and State) Miami Dade County Drainage Projects, Miami-Dade County, Florida – Miami- Dade County Department of Transportation and Public Works (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2017 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Construction Inspector responsible for maintaining complete and accurate records of all activities and events related to the project; keeping the daily project journals, including maintaining accurate records of the contractor's operations, quantities installed, sampling and testing data, project photo and video documentation; review of Work Zone traffic control plan design, implementation, and inspection of maintenance of traffic schemes and devices in work zones to assure they are in accordance with the C ounty’s requirements; properly documenting all significant Project changes; interpreting plans, specifications, and construction contract provisions; reviewing and keeping project as-builts current and up to date, making recommendations to the County to resolve disputes; and assisting with the project closeout. Project #: Varies; Cost/Fees Paid: $200,000; Construction Cost: $2,000,000 (Estimated). d. (1) TITLE AND LOCATION (City and State) SW 212th Street Drainage LAP Project CEI, Miami-Dade County, Florida – Town of Cutler Bay (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2015 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Inspector who performed inspections to verify that all punch list items were resolved. The work included milling and resurfacing, new curb and gutters, ADA compliant curb ramps, signing, and pavement markings, replacement of damaged sidewalk flags, and the installation of a solar- powered pedestrian beacon rapid-flashing. FM #: 436608-1-52-01; Project Length: 0.34 miles Cost/Fees Paid: $70,514.80; Construction Cost: $727,590.87. e. (1) TITLE AND LOCATION (City and State) Design Services for SR-710/Beeline Highway, Palm Beach County, Florida – FDOT, District 4 (2) YEAR COMPLETED PROFESSIONAL SERVICES Ongoing CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Traffic Data Collector – He performed traffic counts and data collection. This project included 24 hour and turning movement counts. Project Length: 3.142 miles; Project #: 419251-1-32-01 Cost/Fees Paid: $572,400.00 Construction Cost: $66.4 Million (Estimate) STANDARD FORM 330 (REV. 8/2016) PAGE 2 Section E - Page | 35 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME ZUGEIL VELEZ 13. ROLE IN THIS CONTRACT Construction Administration/ Resident Compliance Specialist 14. YEARS EXPERIENCE a. TOTAL 2 b. WITH CURRENT FIRM 2 15. FIRM NAME AND LOCATION (City and State) R.J. BEHAR & COMPANY, INC. 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 16. EDUCATION (Degree and Specialization) A.A. ESL, Inter American University of Puerto Rico- San German, 2010 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) FDOT Resident Compliance Specialist CBT Training FDOT Equal Opportunity Compliance Training FDOT FHWA Emergency Relief Program Training for Local Agencies FDOT LAP Construction Checklist, Specifications & Greenbook Training 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Ms. Velez is involved in ensuring the goals of the anticipated Disadvantage Business Enterprise (DBE) statement are achieved per established Federal and State regulations, which necessitates monthly examining of payments to the prime contractor and/or subcontractors. She aids the Office Support Specialist with Site-management entries, as well as monthly progress estimates. She also serves a Public Information Officer on multiple projects, assisting with fliers, community awareness, and public meetings. 1 9. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Colbert Elementary School Safe Routes to School, City of Hollywood/FDOT, District 4/Federal Highway Administration (FHWA) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2019 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Resident Compliance Specialist: She is assisting the City in complying with all State and Federal Equal Employment Opportunity (EEO) requirements as they apply to this project, including the provisions of the USDOT and the FHWA. Her duties include conducting labor interviews, performing monthly jobsite Bulletin Board inspections, reviewing sublets, and subcontracts, July Reports, review and file certified payrolls as well as loading all documentation into FDOT LapIT. Project #: 436921-1-58-01; Cost/Fees Paid: $34,944.80; Construction Cost: $1,199,507.60 b. (1) TITLE AND LOCATION (City and State) Miramar Parkway Streetscape from 68th Avenue to 64th Avenue CEI Services, Broward County, Florida – City of Miramar/FDOT, District 4/FHWA (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2020 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Resident Compliance Specialist assisting the City in complying with all State and Federal Equal Employment Opportunity (EEO) requirements as they apply to this project, including the provisions of the USDOT and the FHWA. She conducts labor interviews, performs monthly jobsite Bulletin Board inspections, reviews sublets, and subcontracts, July Reports, reviews and files certified payrolls as well as loading all documentation into FDOT LapIT. Project #: 438124-1-58-01; Cost/Fees Paid: $130,000.00; Construction Cost: $1,500,300.00; c. (1) TITLE AND LOCATION (City and State) NW 60th Avenue Bicycle/Pedestrian Improvement Project, Miami-Dade County, Florida – Town of Miami Lakes/FDOT, District 6/FHWA (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2020 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Resident Compliance Specialist: She is assisting the City in complying with all State and EEO requirements as they apply to this project, including the provisions of the USDOT and the FHWA. Her duties include conducting labor interviews, performing monthly jobsite Bulletin Board inspections, reviewing sublets, and subcontracts, July Reports, review and file certified payrolls as well as loading all documentation into FDOT LapIT. Project #: 435509‐1‐58‐01; Cost/Fees Paid: $72,859.39; Construction Cost: 1,059,175.86. d. (1) TITLE AND LOCATION (City and State) Overhead Flashing School Zone Signs CEI Services, Palm Beach County, Florida – Palm Beach County Roadway Division/FDOT, District 4 (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2020 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Resident Compliance Specialist responsible for reviewing weekly certified payrolls, maintaining compliance files and spreadsheets, and making certain the contractor conforms to all project EEO/AA requirements. Her responsibilities also include uploading all documentation into the LAP- IT program for FDOT as well as checking the DBE contractor’s payments into the EOC system. Cost/Fees Paid: $89,814.76; Construction Cost: $532,222 e. (1) TITLE AND LOCATION (City and State) Manta Drive Improvement LAP Project, Miami-Dade County, Florida – Town of Cutler Bay/FDOT, District 6 (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2019 (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Assistant Resident Compliance Specialist/Contract Support Specialist: She was responsible for scanning and uploading all project documentation, maintaining and organizing contract documentation, preparing meeting minutes, attending all FDOT project audits, conducting labor interviews, performing monthly jobsite Bulletin Board inspections, reviewing sublets, and subcontracts, July Reports, and review and file certified payrolls. Project #: 01641; Project Length: 1,000 LF; Costs/Fees Paid: $66,120.00; Construction Cost: $620,000.00. STANDARD FORM 330 (REV. 8/2016) PAGE 2 Section E - Page | 36 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 1 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED SW 136TH STREET FROM US-1 TO OLD CUTLER ROAD - LAP VILLAGE OF PALMETTO BAY, FLORIDA PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER Village of Palmetto Bay 9705 East Hibiscus Street Palmetto Bay, Florida 33157 b. POINT OF CONTACT NAME Mr. Dionisio Torres Director, Public Works c. POINT OF CONTACT TELEPHONE NUMBER Tel: 305-969-5011 Email: dtorres@palmettobay-fl.gov 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) R.J. Behar & Company, Inc. (RJ Behar) was contracted by the Village of Palmetto Bay to provide professional engineering services for the construction of roadway improvement project and on-road dedicated bicycle lanes along SW 136th Street from US-1 to Cutler Road. This is a Local Agency Program (LAP) Agreement project between Miami -Dade County, the Village of Palmetto Bay, the Village of Pine Crest and the Florida Department of Transportation. The project involves roadway plans, pavement marking and signing plans, utility coordination, drainage design and, permitting. The improvements will require milling and resurfacing the existing roadway and pavement widening to accommodate an on-road dedicated bicycle lane. The primary challenge for this project was a ccommodating the proposed sidewalks and bicycle lanes in a right of way constrained corridor. Cost/Fees Paid: $193,171.00  Construction Cost: $1,700,345.00 (Estimated)  Project Length: 1.75 Miles Key Personnel: Robert J. Behar, PE - Principal in Charge  Carlos Mazorra, PE – Project Manager | Paola Riveros, PE – Project Engineer | Kira Leon, PE – Project Engineer | Hector Rosario, EI – Project Engineer | Elmer Cardenas, PE – Project Engineer | Joyce Ledan, EI – Project Designer | Angel Marinez – Project Designer | Jaime Delgado – Utility Coordinator. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1)FIRM NAME R.J. BEHAR & COMPANY, INC. (2)FIRM LOCATION (City and State) 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 (3) ROLE Project management, site visits, signing and pavement markings, utility coordination. STANDARD FORM 330 (REV. 8/2016) PAGE 1 Section E - Page | 37 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 2 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED CITY CENTER TRAFFIC IMPACT STUDY CITY OF PEMBROKE PINES, FLORIDA PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Pembroke Pines 601 City Center Way Pembroke Pines, Florida 33025 b. POINT OF CONTACT NAME Mr. Karl Kennedy, PE City Engineer c. POINT OF CONTACT TELEPHONE NUMBER Tel: (954) 518-9040 Email: kkennedy@ppines.com 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The City of Pembroke Pines wanted to determine the potential traffic impact as a result of the vehicular traffic generated by the proposed project, Charles F. Dodge City Center (City Center). This project was constructed south of Pines Boulevard, between Hiatus Road and Palm Avenue. The project was constructed in three phases, including two commercial areas, 365 units of apartments, 387 units of multifamily housing, a hotel and the development of the City Center. There is a 6.5- acre empty lot pending future development. According to the proposed plans, future customers/residents will be able to access the development through several roadways including Washington Street and Hiatus Road; Hiatus Rd. and Palm Avenue; Pines Boulevard with 103 Ave, 106 Ave. and 108 Ave.; City Center Blvd. and Palm Ave.; and SW 7 St. and Palm Ave. The objective of this traffic impact study was to determine the impact of the vehicular traffic generated from the proposed development project. The traffic analyses focused on determining the effects in a 2-year projection time period and assessed the existing and future conditions with and without the project’s generated vehicular traffic. The scope of work included traffic data collection, trip generation analysis, trip distribution, trip assignment, crash history and capacity/level-of-service (LOS) analyses. The analyses included eight intersections. Cost/Fees Paid: $$57,873.75 Construction Cost: Not applicable Key Personnel: Robert J. Behar, PE - Principal in Charge l Rafael De Arazoza, PE - Project Manager l Michelle Leon, EI - Project Engineer/Data Collection l Hector Rosario, EI - Data Collection 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME R.J. BEHAR & COMPANY, INC. (2) FIRM LOCATION 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 (3) ROLE RJ Behar performed field reviews, data collection, signal timing, LOS Analysis, Review of Traffic Impacts, and compiled a report. STANDARD FORM 330 (1/2004) Section E - Page | 38 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 3 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED MS4 NPDES STORMWATER ASSESSMENT PROGRAM CITY OF HIALEAH, FLORIDA PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Hialeah, Streets Department 5601 East 8th Avenue Hialeah, Florida 33013 b. POINT OF CONTACT NAME Mr. Jose Sanchez Director, Streets Division c. POINT OF CONTACT TELEPHONE NUMBER Tel: (305) 687-2611 E-mail: josanchez@hialeahfl.gov 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) RJ Behar was contracted by the City of Hialeah to assist with the preparation of the stormwater assessment program, as required by the Municipal Separate Storm Sewer System Permit that was issued June 30, 2016. This permit covers all areas located within the political boundary of the City of Hialeah that is served by the MS4 owned or operated by the City. The permit requires the preparation of an Assessment Program. This Assessment Program is to be submitted to the Florida Department of Environmental Protection in fulfillment of Part V.B of the MS4 Permit. The purpose of this assessment program was to provide information for the City of Hialeah to determine the overall effectiveness of its Stormwater Management Program (SWMP) in reducing stormwater pollutant loadings from its Municipal Separate Storm Sewer System (MS4) to receiving water bodies. The scope of services included the following steps: a. The preparation of a water quality monitoring plan intended to identify local sources where urban stormwater is adversely affecting surface water resources. The testing was done by Miami-Dade County under an Interlocal agreement. b. The preparation of an estimate of pollutant loadings/evaluation of existing data. c. Preparing a description of how the data from the monitoring program and the estimate of pollutants will be used to: (1) evaluating trends in pollutant loadings from the MS4 and in water quality; and (2) identifying portions of the MS4 which can be targeted for loading reduction/corrective action with additional pollutant reduction measures. d. Preparing a report that included items a, b and c above. e. Submitting the report for review by the City and after approval, submitting the report to the FDEP and addressing any comments from FDEP and provide a Final Assessment Program. The monitoring plan follows the recommendations provided in the Florida Department of Environmental Protection (FDEP) Guidance for Preparing Stormwater Monitoring Plans as Required for Phase I Municipal Separate Storm Sewer System (MS4) Permits. As a continuation of the task RJ Behar completed: a. Update of the Assessment Program b. Prepared two Public Education and Outreach Presentations for Illicit Discharges and Use of Pesticides. c. Prepared a Bacteria Pollution Control Plan. Cost/Fees Paid: $29,772 | Construction Cost: N/A | Project Length: N/A Key Personnel: Juan H. Vazquez, PE, PH, BCEE – Principal in Charge │Hans Murzi, PE, CFM – Project Engineer │ Hector Rosario, EI – Project Engineer. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME R.J. BEHAR & COMPANY, INC. (2) FIRM LOCATION (City and State) 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 (3) ROLE NPDES MS4 Assessment Program, Bacteria Pollution Control Plan, Outreach presentations STANDARD FORM 330 (REV. 8/2016) PAGE 3 MS4 NPDES Stormwater Assessment, City of Hialeah Section E - Page | 39 Flood 10/31/2011 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 4 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED LYONS PARK NEIGHBORHOOD IMPROVEMENT PROJECT CITY OF POMPANO BEACH, FLORIDA PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Pompano Beach Engineering Division 1201 NE 5th Avenue Pompano Beach, FL 33060 b. POINT OF CONTACT NAME Mr. John Sfiropoulos, PE City Engineer c. POINT OF CONTACT TELEPHONE NUMBER Tel: (954) 545-7009 Email: John.Sfiropoulos@copbfl.com 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The Lyons Park Neighborhood is located west of South Cypress Road, north of McNab Road, east of South Flagler Avenue and south of Southwest 8th Street. The area is served by an existing stormwater collection system. The existing stormwater management system consists of four independent systems, which discharge to systems outside of the neighborhood. The ultimate outfalls are located to the south of West McNab Road and to the east of South Cypress Road. The project area suffers from flooding problems as documented in the City Stormwater Master Plan (SWMP). This project intends to improve the drainage systems within the project area. The sanitary sewer lines within the Lyons Park Neighborhood are located in the rear yard easements of the properties/homes. One of the City of Pompano Beach’s Comprehensive Plan policies is to identify the feasibility of implementing capital projects to relocate the sewer lines or to rehabilitate them in place. This project includes the design for the relocation of the sewers to the street’s right-of-way and new lateral services. The project also includes design of water line relocations in areas where there are conflicts with other improvements. As part of the project all the streets will be reconstructed, with new pavement markings, and completely new stormsewer system, sanitary sewer system, and regraded swales. The design included structural design of seawall repairs for new outfalls. An extensive public outreach effort was conducted including presentations, workshops and one-on-one meetings. Also included was the coordination and preparation of Right-of-way sketches for required easements. Cost/Fees Paid: $410,000.00 | Construction Cost: $10,800,000 (Estimate) Key Personnel: Juan H. Vazquez, PE, PH, BCEE – Principal in Charge/Project Manager │Hans Murzi, PE – Assistant Project Manager │Elmer Cardenas, PE, CEI – Project Engineer │Paola Riveros, PE – Project Engineer │ Kira Leon, EI – Project Engineer │Noel Flores, EI – Structural Engineer │Sugeily Patxot – Designer │Joseph Edwards, EI – Project Engineer. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME R.J. BEHAR & COMPANY, INC. (2) FIRM LOCATION (City and State) 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 (3) ROLE Stormwater design, sanitary sewer design of the wastewater collection system, design of proposed water improvements, utility coordination, permitting, and cost estimating. b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 (REV. 8/2016) PAGE 3 Section E - Page | 40 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 5 21. TITLE AND LOCATION (City and State) COPANS ROAD WASTEWATER TRANSMISSION SYSTEM REHABILITATION – CITY OF COCONUT CREEK, FLORIDA 22. YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) Ongoing 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER City of Coconut Creek 5295 Johnson Road Coconut Creek, Florida 33073 b. POINT OF CONTACT NAME Mr. Dany Kabrit Project Manager c. POINT OF CONTACT TELEPHONE NUMBER Tel: (954) 973-6786 Ext #1545 E-mail: DKabrit@coconutcreek.net BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The design for this project was based on the results of the Feasibility Study for Copans Road Wastewater Transmission System Alternatives Study dated January 2017. The existing transmission force mains within the project limits presently convey flows discharged from Lift Station (“LS”) No.12 via a 20” diameter piping system containing both Ductile Iron Pipe (“DIP”) and Cast Iron Pipes (“CIP”) east along Copans Road where it picks up flows from LS No. 13 and LS No. 14. The flow continues to the City’s eastern boundary where it intersects with the Florida Turnpike and meets the City of Pompano Beach. At this location additional flow from an 18” diameter force main, conveying the discharge flow transmitted from LS No.10 is added. LS No 10A and LS No.10B are satellites to LS No. 10. The cumulative flows are then conveyed in a 24” CIP force main east along Copans Road to its termination point within the Broward County North Regional Wastewater Treatment Plant (NRWWTP). The existing force mains cannot be taken out of service for long periods of time due to the numerous connections and upstream pumping stations. The referenced force main system presently conveys approximately 2.0 million gallons of wastewater per day (2.0 MGD) of the City’s wastewater to the destination plant. For this reason, the age of the system and the uncertainty of the materials used for its construction, the City has concluded to replace and upgrade the system as necessary from Lift Stations 10 and 12 to the NRWWTP. This phase will include a new force main between LS 12 and the existing Broward County 54” diameter force main which conveys flows east along Sample Road to a termination point at the NRWWTP, and rehabilitation of the force main from LS 12 to the connection from the Wynmoor Community, just west of the Florida Turnpike. The final design included 7,190 ft of 20-inch HDPE force main and rehabilitation of 4,420 ft existing 24-inch force main using trenchless technology. The 20-inch was designed using directional drilling and the rehabilitation using PVC Sliplining. Cost/Fees Paid: $88,000 | Construction Cost: $3,000,000 (Est.) Key Personnel: Juan Vazquez, PE – Principal in Charge and Engineer of Record | Hans Murzi, PE – Drainage Engineer | Elmer Cardenas, PE – Cost Estimates | Kira Leon, PE – Project Engineer | Jossmel Cruz, MS – Plans Preparation. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME R.J. Behar & Company, Inc. (2) FIRM LOCATION (City and State) 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 (3) ROLE Wastewater Force Main Rehabilitation STANDARD FORM 330 (REV. 8/2016) PAGE 1 Section E - Page | 41 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 6 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED CULTURAL PARK CITY OF HIALEAH, FL PROFESSIONAL SERVICES 2015 CONSTRUCTION (If applicable) 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Hialeah 900 East 56th Street, Building No 1 Hialeah, FL 33013 b. POINT OF CONTACT NAME Mr. Vicente Rodriguez Director of Construction and Maintenance c. POINT OF CONTACT TELEPHONE NUMBER Tel: (305) 687-2620 E-mail: VRodriguez@hialeahfl.gov 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) R.J. Behar & Company, Inc. (RJ Behar) was contracted by the City of Hialeah to civil site design for the Cultural Park between W. 75th Street and West 76th Street from W 19th Court to W 17th Avenue to north of W 18th Lane within Hialeah. The project included a new parking lot, grading the ball fields. The services entailed paving, grading, and drainage plans. The plans required permitting by the DRER and the City of Hialeah. Cost/Fees Paid: $37,903.00Change Orders:2=$20,000Construction Cost: $475,000.00Project Started: 4/26/2013 Project Completed: 10/2/2015 Key Personnel: Robert J. Behar, PE – Principal in Charge  Javier Rodriguez, PE – Project Manager  Yulet Miguel, PE – Project Engineer  Andrea Virgin, PE, LEED AP – Project Engineer  Mariana Urdaneta – Technician 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME R.J. BEHAR & COMPANY, INC. (2) FIRM LOCATION 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 (3) ROLE Park, landscaping, concrete sidewalk, signing and pavement marking, drainage, cost estimates, and utility coordination. STANDARD FORM 330 (1/2004) Section E - Page | 42 Exist. Generator F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 7 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED RIVERVIEW PUMP STATION NEW GENERATOR, FIRE SUPPRESANT AND MAIN SWITCH DISCONNECT CITY OF MIAMI, FLORIDA PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) Ongoing 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Miami Department of Public Works - NPDES Section 444 S.W. 2nd Avenue, 8th Floor Miami, Florida 33130 b. POINT OF CONTACT NAME Ms. Maria Gabriela David, E.I. Engineer I c. POINT OF CONTACT TELEPHONE NUMBER Tel.: (305) 416-1244 E-mail: mdavid@miamigov.com 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) R.J. Behar & Company, Inc. (RJ Behar) was contracted to provide engineering services for the replacement of the Riverview Pump Station Generator and pumps interconnection in the City of Miami. The Riverview Pump Station is located at 1301 NW 6th Street, approximately 500 ft. east of the Marlin’s Baseball Park. The pump station is part of the City's stormwater system that includes 12 stormwater pump stations, 1.36 million feet of pipes, over 14,400 catch basins and manholes and 257 outfall structures. In 2013, the City removed two axial pumps and respective motors and installed two new Fairbanks Morse 35,000 GMP Axial Flow Pumps and two 500 HP motors at the Riverview Pump Station. The work on this project included the removal of the existing generator and the installation of a new generator. The engineering analysis included the following: 1. Analysis of two possible scenarios for sizing the new generator. 2. Design and Plans Preparation 3. Project Specifications 4. Estimates of Probable Costs Services will also include Engineer of Record Post Design Support and Construction Management Assistance. The design also included the structural design of the new generator foundation. The project also includes design of a new Fire Suppressant System and Main Switch Disconnect for the Pump Station. This portion of the work is being done by a subconsultant. Cost/Fees Paid: $74,200 | Construction Cost: $935,000 (Estimate) | Project #: M-0127 Key Personnel: Juan. H. Vazquez, PE, PH, BCEE – Principal in Charge │ Reynaldo Orozco, PE – Electrical Engineer Nestor Santana, PE – Cost Estimates and Specs | Kira Leon, EI – Plans Preparation 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME R.J. BEHAR & COMPANY, INC. (2) FIRM LOCATION (City and State) 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 (3) ROLE Project Management, Electrical design, Cost estimates and Specifications b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 (REV. 8/2016) PAGE 3 Section E - Page | 43 After BBB eee fff ooo rrr eee F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 8 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED HATTON HIGHWAY BRIDGE REPLACEMENT OVER THE PAHOKEE WATER CONTROL DISTRICT’S CANAL NO. 2 PALM BEACH COUNTY, FLORIDA PROFESSIONAL SERVICES 2015 CONSTRUCTION (If applicable) 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER Palm Beach County Department of Engineering & Public Works, Division of Roadway Production 2300 North Jog Road West Palm Beach, Florida 33411 b. POINT OF CONTACT NAME Mr. David L. Young, PE Project Manager Special Projects Section c. POINT OF CONTACT TELEPHONE NUMBER Tel: (561) 684-4150 E-mail: dlyoung@pbcgov.org 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Palm Beach County’s (County) Road & Bridge Division decided to replace the existing bridge over the Pahokee Water Control District’s Canal No. 2. The County requested replacement of the existing 4-span bridge, which was approximately 60’ long, Bridge PB # 934512. The bridge replacement design located the new structure with a sufficiently clear distance from the existing FPL 138 Kv. overhead transmission line along the east side of Hatton Highway. Hatton Highway was reconstructed to accommodate the selected bridge replacement. A preliminary alternative analysis was conducted to determine the appropriate roadway section, construction requirements, and limits of work. The bridge design was based on providing a similar 3-span arrangement over the canal, 60’ clearance. The bridge cross section included two 12’ lanes with 8’ shoulders, concrete barriers, and no provisions for sidewalks. Wing walls and slope protection were designed to accommodate the new bridge highway alignment and typical section. The bridge design elements were developed in accordance with the County’s Thoroughfare Road and Bridge Design Procedures. R.J. Behar & Company, Inc. (RJ Behar) was responsible for all permit coordination on the project. Successful completion of the plans and specifications was achieved with a final score of 97 out of 100. Cost/Fees Paid: $276,527.55 | Construction Cost: $4,000,000.00 (Estimate) Key Personnel: Robert J. Behar, PE – Principal in Charge │Sean O’Keefe, PE – Project Manager | Juan H. Vazquez, PE, PH, BCEE – Drainage Engineer | Jerry Piccolo, PE – Sr. Structural Engineer | Jasmani Riveron, PE – Roadway Engineer. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME R.J. BEHAR & COMPANY, INC. (2) FIRM LOCATION (City and State) 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 (3) ROLE Roadway Improvements, Bridge Design, Drainage Design, Permitting. b. (1) FIRM NAME Tierra South Florida (2) FIRM LOCATION (City and State) 2765 Vista Parkway, Suite 10 West Palm Beach, FL 33411 (3) ROLE Geotechnical Engineering c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 (REV. 8/2016) PAGE 3 Section E - Page | 44 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 9 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED SEAWALL DESIGN AT TOBIE WILSON PARK TOWN OF MEDLEY, FLORIDA PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) 2020 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER Town of Medley Capital Projects & Economic Development b. POINT OF CONTACT NAME Mr. Jorge E. Corzo PE Town Engineer/Director c. POINT OF CONTACT TELEPHONE NUMBER Tel: (305) 887-9541 Ext.143 E-mail: jcorzo@townofmedley.com 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) R.J. Behar & Company, Inc. (RJ Behar) was contacted by the Town of Medley to provide engineering design services for a seawall design at Tobie Wilson Park. The Town of Medley owns the Tobie Wilson Park, which is located at 7921 NW South River Dr, Medley, Florida 33166. The park is sited between NW South River Drive and the Miami Canal (C-6). The scope of work included design of approximately 850 feet of new bulkhead wall to be located on the north side of the park along the south bank of the Miami Canal. RJ Behar’s scope included field reviews, structural design, plans preparation, bidding assistance, ROW permitting with South Florida Water Management District, estimates of probable costs and technical specifications. RJ Behar also assisted with the grant preparation and construction engineering inspection. Cost/Fees Paid: $112,000  Construction Cost: $900,000 Project Start: 09//2016  Project Complete: 4/2020 Key Personnel: Robert Behar, PE – Principal in Charge/Project Manager  Jose Peña Ramos, PE – Structural Engineer  Michelle Leon, EI - Project EngineerJossmel Cruz-Garcia, EI - Structural Designer | Richard Bolt – Right-of-way, Permitting.Nestor Santana, PE – Construction Manager Alejandro Medina – Senior Inspector 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME R.J. BEHAR & COMPANY, INC. (2) FIRM LOCATION 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 (3) ROLE Structural analysis and design, plans preparation, permitting, grant preparation, construction management and inspection. STANDARD FORM 330 (1/2004) After Before Section E - Page | 45 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 10 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED SAFE ROUTES TO SCHOOL MIAMI LAKES ELEMENTARY SCHOOL - LOCAL AGENCY PROGRAM (LAP) CEI SERVICES, TOWN OF MIAMI LAKES, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2020 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER Town of Miami Lakes 6601 Main Street Miami Lakes, FL 33014 b. POINT OF CONTACT NAME Mr. Omar Santos Baez Public Works Engineer c. POINT OF CONTACT TELEPHONE NUMBER Tel: (305)364-6100 ext. 1182 Email: santoso@miamilakes-fl.gov 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) R.J. Behar & Company, Inc. (RJ Behar) is providing Construction Engineering Inspection (CEI) services, on a part-time basis as requested by the Town, for contract administration, inspection, and materials sampling and testing for the Safe Routes to Schools Infrastructure Improvements Project. This project is receiving Federal Highway Administration (FHWA) Federal Funding via the Florida Department of Transportation (FOOT) LAP Program. This project is designated as an "Off the State Highway (Off-System) LAP Project. RJ Behar is performing the necessary services to coordinate the activities of all parties involved in completing the Project, which includes maintaining complete and accurate records of the Project; documenting all significant Project changes; assisting the Town with interpreting plans, specifications, and construction contract provisions; making recommendations to the Town to resolve disputes; and coordinating with FOOT for LAP requirement compliance. The Resident Compliance Specialist’s duties included conducting labor interviews, performing monthly jobsite Bulletin Board inspections, reviewing sublets, and subcontracts, July Reports, and review and file certified payrolls. RJ Behar performed daily inspections, produced weekly reports, monitored the contractor’s pay items, attended progress meetings, monitored shop drawings and RFIs, performed Temporary Traffic Control Plan Reviews including the coordination of lane closures, and conducted the material sample reviews. Cost/Fees Paid: $71,056.40│Construction Cost: $710,100│Project Start: 4/2019│Project Complete: 8/2020 FDOT │FM #: 425857-2-58-01 Key Personnel: Robert J. Behar, PE – Principal in Charge Nestor Santana, PE – Project Manager/Senior Project Engineer Alejandro Medina – Contract Support Specialist Logan Fasanella – Senior Inspector Zugeil Velez – Resident Compliance Specialist 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME R.J. BEHAR & COMPANY, INC. (2) FIRM LOCATION 6861 SW 196th Avenue, Suite 302 Pembroke Pines, FL 33332 (3) ROLE Construction Engineering and Inspection Services and Management STANDARD FORM 330 (1/2004) Section E - Page | 46 STANDARD FORM 330 (REV. 8/2016) PAGE 4 G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 26. NAMES OF KEY PERSONNEL (From Section E, Block 12) 27. ROLE IN THIS CONTRACT (From Section E, Block 13) 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in “Examples Projects Key” section below before completing table. Place “X” under project key number for participation in same or similar role.) 1 2 3 4 5 6 7 8 9 10 Paola Riveros, PE Project Manager; Roadway Streetscape, Sidewalks, Parking Pavement Evaluation & Repairs, SP&M; Civil/Site, Feasibility Studies, Parks and Recreational Facilities, Lighting, Utilities. X X X X X X X Robert J. Behar, PE Principal in Charge; Roadway, Streetscape, Sidewalks, Parking, Pavement Evaluation; Civil/Site, Feasibility Studies, Parks and Recreational Facilities, Lighting; Compliance w/ Federal, State & Local Regulatory Agencies. X X X X X X X X Juan H. Vazquez, PE, PH, BCEE QA/QC; Drainage, Stormwater Wells, Pumps, Water Distribution, Wastewater Collection Systems; Environmental Permitting; Compliance w/ Federal, State & Local Regulatory Agencies. X X X X X X X X X Rafael De Arazoza, PE, PTOE Transportation Planning/Traffic Studies; Compliance w/ Federal, State & Local Regulatory Agencies. X X Hans Murzi, PE, CFM Drainage Improvements, Stormwater Wells, Pumps, Water Distribution, Wastewater Collection Systems; Environmental Permitting. X X X X X X Elmer Cardenas, PE Drainage Improvements, Stormwater Wells, Pumps, Water Distribution, Wastewater Collection Systems; Environmental Permitting. X X X X X X 29. EXAMPLE PROJECTS KEY NUMBER TITLE OF EXAMPLE PROJECT (From Section F) NUMBER TITLE OF EXAMPLE PROJECT (From Section F) 1 SW 136th Street – Village of Palmetto Bay, FL 6 Cultural Park City of Hialeah, FL 2 City Center Traffic Impact Study City of Pembroke Pines, Florida 7 Riverview Pump Station New Generator, Fire Suppressant and Main Switch Disconnect City of Miami, FL 3 MS4 NPDES Stormwater Assessment Program City of Hialeah, FL 8 Hatton Highway Bridge Replacement over the Pahokee Water Control District’s Canal No. 2 Palm Beach County, FL 4 Lyons Park Neighborhood Improvement Project City of Pompano Beach, FL 9 Seawall Design at Tobie Wilson Park Town of Medley, FL 5 Copans Road Wastewater Transmission System Rehabilitation – City of Coconut Creek, FL 10 Safe Routes to School Miami Lakes Elementary School - Local Agency Program (LAP) CEI Services, Town of Miami Lakes, FL Section E - Page | 47 STANDARD FORM 330 (REV. 8/2016) PAGE 4 G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 26. NAMES OF KEY PERSONNEL (From Section E, Block 12) 27. ROLE IN THIS CONTRACT (From Section E, Block 13) 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in “Examples Projects Key” section below before completing table. Place “X” under project key number for participation in same or similar role.) 1 2 3 4 5 6 7 8 9 10 Jose A. Peña, PE Bridges, Structural Systems, Seawall, Buildings, Water & Wastewater Plants, Misc. Structures; Rehabilitation & Strengthening Existing Structures; Threshold Inspections; Cost Estimating X X X X Jerry Piccolo, PE Bridges, Structural Systems, Seawall, Water Plants, Misc. Structures X X X X Rafael Droz-Seda, PE Threshold Inspections X Carmelo J. Ramos, PE Civil, Electrical Engineer, Street Lighting; Pumps X X Jasmani Riveron, PE Roadway, Streetscape, Sidewalks, Parking, Pavement Evaluation & Repairs, SP&M; Utilities X X X X X X Nestor Santana, PE Construction Administration Services & Inspections, Cost Estimates; Structures; Threshold Inspections X X X X X X X Hector Rosario, EI Drainage, Stormwater Pumps, Water Distribution, Wastewater Collection Systems; Transportation/Traffic X X X X X X X Michelle Leon, EI Traffic Engineering & Studies Construction Administration Services and Inspections. X X X X X X X Jossmel Cruz-García, EI Bridges, Seawall Structures, Buildings, Water & Wastewater Plants, Miscellaneous Structures X X X X 29. EXAMPLE PROJECTS KEY NUMBER TITLE OF EXAMPLE PROJECT (From Section F) NUMBER TITLE OF EXAMPLE PROJECT (From Section F) 1 SW 136th Street – Village of Palmetto Bay, FL 6 Cultural Park City of Hialeah, FL 2 City Center Traffic Impact Study City of Pembroke Pines, Florida 7 Riverview Pump Station New Generator, Fire Suppressant and Main Switch Disconnect City of Miami, FL 3 MS4 NPDES Stormwater Assessment Program City of Hialeah, FL 8 Hatton Highway Bridge Replacement over the Pahokee Water Control District’s Canal No. 2 Palm Beach County, FL 4 Lyons Park Neighborhood Improvement Project City of Pompano Beach, FL 9 Seawall Design at Tobie Wilson Park Town of Medley, FL 5 Copans Road Wastewater Transmission System Rehabilitation – City of Coconut Creek, FL 10 Safe Routes to School Miami Lakes Elementary School - Local Agency Program (LAP) CEI Services, Town of Miami Lakes, FL Section E - Page | 48 STANDARD FORM 330 (REV. 8/2016) PAGE 4 G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 26. NAMES OF KEY PERSONNEL (From Section E, Block 12) 27. ROLE IN THIS CONTRACT (From Section E, Block 13) 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in “Examples Projects Key” section below before completing table. Place “X” under project key number for participation in same or similar role.) 1 2 3 4 5 6 7 8 9 10 Joyce Ledan, EI Civil/Site Design, Parks; Drainage Improvements, Stormwater, Pumps, Water & Sewer X X X X X X X Xamarah Velez-Seda Roadway, Streetscape, Sidewalks, Parking, Pavement Evaluation & Repairs, SP&M; Utilities; Civil, Parks, Drainage, Stormwater, Pumps, Water & Sewer X X X X Angel Marinez Engineer Designer/ Roadway Improvements, Streetscape, Sidewalks, Parking, Pavement Evaluation, SP&M X X Nanette Akyaz-Gómez CAD - Roadway, Streets Design, Sidewalks, Parking, SP&M; Civil/Site, Parks, Lighting; Drainage, Stormwater, Water, Wastewater X X X X X X X Jaime Delgado CAD/Utility Coordination/Traffic X X X X X X Alejandro Medina Construction Administration Services and Inspections X X Logan Fasanella Construction Engineering Inspections/Traffic X X Zugeil Velez Construction Administration/ Resident Compliance Specialist X 29. EXAMPLE PROJECTS KEY NUMBER TITLE OF EXAMPLE PROJECT (From Section F) NUMBER TITLE OF EXAMPLE PROJECT (From Section F) 1 SW 136th Street – Village of Palmetto Bay, FL 6 Cultural Park City of Hialeah, FL 2 City Center Traffic Impact Study City of Pembroke Pines, Florida 7 Riverview Pump Station New Generator, Fire Suppressant and Main Switch Disconnect City of Miami, FL 3 MS4 NPDES Stormwater Assessment Program City of Hialeah, FL 8 Hatton Highway Bridge Replacement over the Pahokee Water Control District’s Canal No. 2 Palm Beach County, FL 4 Lyons Park Neighborhood Improvement Project City of Pompano Beach, FL 9 Seawall Design at Tobie Wilson Park Town of Medley, FL 5 Copans Road Wastewater Transmission System Rehabilitation – City of Coconut Creek, FL 10 Safe Routes to School Miami Lakes Elementary School - Local Agency Program (LAP) CEI Services, Town of Miami Lakes, FL Section E - Page | 49 STANDARD FORM 330 (REV. 8/2016) ARCHITECT - ENGINEER QUALIFICATIONS PART I - CONTRACT-SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1. TITLE AND LOCATION (City and State) Continuing Professional Consulting Services (CCNA) – The City of Sunny Isles Beach 2. PUBLIC NOTICE DATE 3. SOLICITATION OR PROJECT NUMBER 20-07-01 B. ARCHITECT-ENGINEER POINT OF CONTACT 4. NAME AND TITLE Raj Krishnasamy, P.E., President/ Principal Engineer 5. NAME OF FIRM TIERRA SOUTH FLORIDA, Inc. (TSF) 6. TELEPHONE NUMBER (561)687-8536 7. FAX NUMBER (561) 687-8570 8. E-MAIL ADDRESS Raj@TSFGeo.com C. PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors.) (Check) 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT PRIME J-V PARTNERSUBCON-TRACTOR a. X CHECK IF BRANCH OFFICE 2765 Vista Parkway, Suite 10 West Palm Beach, FL 33411 Geotechnical Engineering b. CHECK IF BRANCH OFFICE c. CHECK IF BRANCH OFFICE d. CHECK IF BRANCH OFFICE D. ORGANIZATIONAL CHART OF PROPOSED TEAM (Attached) Section E - Page | 52 STANDARD FORM 330 (REV. 8/2016) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Raj Krishnasamy, P.E. 13. ROLE IN THIS CONTRACT Principal-in-Charge, Principal Engineer 14. YEARS EXPERIENCE a. TOTAL 33 b. WITH CURRENT FIRM 20 15. FIRM NAME AND LOCATION (City and State) TIERRA SOUTH FLORIDA, INC. (TSF) West Palm Beach, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) BS Civil Engineering, Christian Brothers University, 1987 MS Civil Engineering, University of Memphis, 1996 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Engineer, Florida No. 53567 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) American Society of Highway Engineers, Past President, Florida Engineering Society, Past Treasurer Geotechnical Material Engineering Council, Past Chairman 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Gateway Park Pedestrian Bridge, City of Sunny Isles Beach, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2014 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Krishnasamy was the Principal-in-Charge of the Geotechnical Engineering Services for the Gateway Park Pedestrian Bridge located in The City of Sunny Isles, Florida. The project consists of the construction of a new pedestrian bridge over State Road No. 826 Westbound. The purpose of this study was to explore the subsurface conditions within or in close proximity to the pedestrian bridge to enable an evaluation of foundations for the construction. Provided a geotechnical engineering report including geotechnical evaluations and recommendations regarding foundation, bridge, pile monitoring and construction considerations regarding excavations. Completed on time and within budget. b. (1) TITLE AND LOCATION (City and State) Samson Oceanfront Park, City of Sunny Isles Beach, Florida. (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2016 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Krishnasamy was the Principal-in-Charge of the Auger-Cast Pile Inspection and Construction Material Testing Services for the Samson Oceanfront Park located in the City of Sunny Isles Beach, Florida. The project consists of a compact beach park with a playgr ound, pavilion and showers. A TSF Senior Engineer provided review of daily reports, handled project coordination and attended meetings as necessary. Completed on time and within project. c. (1) TITLE AND LOCATION (City and State) SW 42 Street (Bird Road Extension) From SW 162 Avenue to SW 157 Avenue, Miami-Dade County, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Krishnasamy was the Principal-in-Charge of the Geotechnical Engineering Services for the widening project of Bird Road Extension from SW 162nd Ave to SW 15th Avenue in Miami-Dade County. The roadway limits are approximately 3,100 lineal feet in length. Provided a geotechnical engineering report including geotechnical evaluations and recommendations regarding permanent cut and fill slope s, excavations, groundwater control, pavement design considerations, and on-site suitability. Completed on time and within budget. d. (1) TITLE AND LOCATION (City and State) Biscayne National Park, Convoy Point/Adams Key, Biscayne Keys, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Krishnasamy was the Principal-in-Charge of the Geotechnical Engineering Study for the Biscayne National Park located in the Biscayne Keys, Florida. The project consists of design repairs and replacements that address the hurricane impact damage caused by Hur ricane Irma and Maria. The study was performed to obtain information on the existing subsurface conditions within the site improvements to assist in the design and preparation of construction plans. Provided a geotechnical engineering report including the results of the subsurface exploration. Completed on time and within budget. e. (1) TITLE AND LOCATION (City and State) Don Soffer School Flashing Signal, City of Aventura, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) On-Going (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Krishnasamy is the Principal-in-Charge of the QC Services for the Don Soffer School – Flashing Signals located in the City of Aventura, Florida. The project consists of the installation of drilled shafts along NE 213th Street intersection with NE 3100 Block and NE 3200 Block. TSF services include laboratory testing, and concrete sampling/testing, and reporting. A TSF QC Manager is providing review of daily reports, project coordination and attending meetings as necessary. Section E - Page | 53 STANDARD FORM 330 (REV. 8/2016) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Francois Thomas, P.E. 13. ROLE IN THIS CONTRACT Principal Engineer, Special Inspector 14. YEARS EXPERIENCE a. TOTAL 27 b. WITH CURRENT FIRM 18 15. FIRM NAME AND LOCATION (City and State) TIERRA SOUTH FLORIDA, INC. (TSF) West Palm Beach, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) MS in Geotechnical Engineering, 1993; BS in Civil Engineering, 1991 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Professional Engineer, Florida No. 56381 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Special Inspector 7021399, Certified Masonry Inspector, Radiation Safety Officer 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Gateway Park Pedestrian Bridge, City of Sunny Isles Beach, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2014 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Thomas was the Principal Engineer of the Geotechnical Engineering Services for the Gateway Park Pedestrian Bridge located in The City of Sunny Isles, Florida. The project consists of the construction of a new pedestrian bridge over State Road No. 826 Westbound. The purpose of this study was to explore the subsurface conditions within or in close proximity to the pedestrian bridge to enable an evaluation of foundations for the construction. TSF’s geotechnical field study included SPT borings. Provided a geotechnical engineering report including geotechnical evaluations and recommendations regarding foundation, bridge, pile monitoring and construction considerations regarding excavations. Completed on time and within budget. b. (1) TITLE AND LOCATION (City and State) Samson Oceanfront Park, City of Sunny Isles Beach, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Thomas was the Principal Engineer of the Auger-Cast Pile Inspection and Construction Material Testing Services for the Samson Oceanfront Park located in the City of Sunny Isles Beach, Florida. The project consists of a compact beach park with a playground, pavilion and showers. A TSF Senior Engineer provided review of daily reports, handled project coordination and attended meetings as necessary. Completed on within budget. c. (1) TITLE AND LOCATION (City and State) Don Soffer School Flashing Signal, City of Aventura, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) On-Going (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Thomas is the Principal Engineer of the QC Services for the Don Soffer School – Flashing Signals located in the City of Aventura, Florida. The project consists of the installation of drilled shafts along NE 213th Street intersection with NE 3100 Block and NE 3200 Block. TSF services include laboratory testing, and concrete sampling/testing, and reporting. A TSF QC Manager is providing review of daily reports, project coordination and attending meetings as necessary. d. (1) TITLE AND LOCATION (City and State) N. Miami Avenue Bridge Replacement, Miami-Dade County, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) On-Going (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Thomas is the Principal Engineer of the QC Services for the N. Miami Avenue Bridge Replacement, located in Miami-Dade County, Florida. Provided a QC Plan and TSF is maintaining a Density Logbook on-site. A TSF QC Manager is providing review of daily reports, project coordination and attending meetings as necessary. e. (1) TITLE AND LOCATION (City and State) Vista Verde Phase 4, Roadway and Drainage Improvement, City of Miami Gardens, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Mr. Thomas was the Principal Engineer of the Geotechnical Engineering Services for the Vista Verde Phase 4 located in the City of Miami Gardens, Florida. The project consists of roadway and drainage improvements, and pavement design. The purpose of this study was to explore the subsurface conditions at the site to enable an evaluation of acceptable construction and site development considerati ons. Provided a geotechnical engineering report including geotechnical evaluation and recommendations regarding excavations, trench backfill, and preconstruction conditions survey. Completed on time and within budget. Section E - Page | 54 STANDARD FORM 330 (REV. 8/2016) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 1 21. TITLE AND LOCATION (City and State) Gateway Park Pedestrian Bridge, City of Sunny Isles Beach, Florida. 22. YEAR COMPLETED PROFESSIONAL SERVICES 2014 CONSTRUCTION (If applicable) 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER City of Sunny Isles Beach c/o RJ Behar & Company, Inc. b. POINT OF CONTACT NAME Mr. Bob Behar, PE c. POINT OF CONTACT TELEPHONE NUMBER (954) 680-7771 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) TSF provided Geotechnical Engineering Services for the Gateway Park Pedestrian Bridge located in The City of Sunny Isles, Florida. The project consists of the construction of a new pedestrian bridge over State Road No. 826 Westbound. The purpose of this study was to explore the subsurface conditions within or in close proximity to the pedestrian bridge to enable an evaluation of foundations for the construction. TSF’s geotechnical field study included SPT borings. Provided a geotechnical engineering report including geotechnical evaluations and recommendations regarding foundation, bridge, pile monitoring and construction considerations regarding excavations. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME TSF (2) FIRM LOCATION (City and State) West Palm Beach, FL (3) ROLE Geotechnical Engineering Services Section E - Page | 55 STANDARD FORM 330 (REV. 8/2016) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 2 21. TITLE AND LOCATION (City and State) Biscayne National Park, Convoy Point/Adams Key, Biscayne Keys, Florida. 22. YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER Miami-Dade County Parks, Recreation and Open Spaces c/o Jacobs b. POINT OF CONTACT NAME Ms. Rita Donnell c. POINT OF CONTACT TELEPHONE NUMBER (720) 286-1572 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) TSF performed a Geotechnical Engineering Study for the Biscayne National Park located in the Biscayne Keys, Florida. The project consists of design repairs and replacements that address the hurricane impact damage caused by Hurricane Irma and Maria. The study was performed to obtain information on the existing subsurface conditions within the site improvements to assist in the design and preparation of construction plans. TSF’s geotechnical field study included SPT borings; Classified soil samples in the laboratory using the Unified Soil Classification System. Provided a geotechnical engineering report including the results of the subsurface exploration. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME TSF (2) FIRM LOCATION (City and State) West Palm Beach, FL (3) ROLE Geotechnical Engineering Services Section E - Page | 56 STANDARD FORM 330 (REV. 8/2016) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 3 21. TITLE AND LOCATION (City and State) N. Miami Avenue Bridge Replacement, Miami-Dade County, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) On-Going 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER Miami-Dade County c/o Douglas N. Higgins b. POINT OF CONTACT NAME Mr. Bernie Barrile c. POINT OF CONTACT TELEPHONE NUMBER (561) 379-8979 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) TSF is currently providing QC Services for the N. Miami Avenue Bridge Replacement, located in Miami-Dade County, Florida. TSF services include laboratory testing, soil sampling/testing, and reporting. Sampling and Laboratory Testing include modified proctor values on subgrade and base material; LBR tests on subgrade and base materials; CTQP Certified TSF technicians are currently performing in-place density testing on slabs, subgrade and base materials and sample pick-ups. Provided a QC Plan and TSF is maintaining a Density Logbook on-site. A TSF QC Manager is providing review of daily reports, project coordination and attending meetings as necessary. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME TSF (2) FIRM LOCATION (City and State) West Palm Beach, FL (3) ROLE Construction Material Testing Services / QC Services Section E - Page | 57 STANDARD FORM 330 (REV. 8/2016) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 4 21. TITLE AND LOCATION (City and State) Don Soffer School Flashing Signal, City of Aventura, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) On-Going 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER City of Aventura c/o Kimley-Horn b. POINT OF CONTACT NAME Mr. Stefano Viola, P.E. c. POINT OF CONTACT TELEPHONE NUMBER / EMAIL (954) 535-5133 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) TSF is currently providing QC Services for the Don Soffer School – Flashing Signals located in the City of Aventura, Florida. The project consists of the installation of drilled shafts along NE 213th Street intersection with NE 3100 Block and NE 3200 Block. TSF services include laboratory testing, and concrete sampling/testing, and reporting. Sampling and Laboratory Testing includes testing compressive strength concrete cylinders. CTQP Certified TSF technicians are conducting slump and temperature testing on concrete; molding compressive strength tests cylinders; sample pick-ups; and providing a Drilled Shaft Inspector to monitor drilled shaft operations. A TSF QC Manager is providing review of daily reports, project coordination and attending meetings as necessary . 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME TSF (2) FIRM LOCATION (City and State) West Palm Beach, FL (3) ROLE Construction Material Testing/ QC Services Section E - Page | 58 STANDARD FORM 330 (REV. 8/2016) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 5 21. TITLE AND LOCATION (City and State) SW 42 Street (Bird Road Extension) From SW 162 Avenue to SW 157 Avenue, Miami-Dade County, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER Miami- Dade Public Works and Waste Management c/o David Plummer & Associates, Inc. b. POINT OF CONTACT NAME Mr. Victor Lee c. POINT OF CONTACT TELEPHONE NUMBER (305)-447-0900 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) TSF provided Geotechnical Engineering Services for the widening project of Bird Road Extension from SW 162 nd Ave to SW 15th Avenue in Miami-Dade County. The roadway limits are approximately 3,100 lineal feet in length. The study was performed to obtain information on the existing subsurface conditions along the project alignment to assist in the design and preparation of construction plans for improvements. TSF’s geotechnical field study included SPT borings. Provided a geotechnical engineering report including geotechnical evaluations and recommendations regarding permanent cut and fill slopes, excavations, groundwater control, pavement design considerations, and on-site suitability. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME TSF (2) FIRM LOCATION (City and State) West Palm Beach, FL (3) ROLE Geotechnical Engineering Services Section E - Page | 59 STANDARD FORM 330 (REV. 8/2016) G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 26. NAMES OF KEY PERSONNEL (From Section E, Block 12) 27. ROLE IN THIS CONTRACT (From Section E, Block 13) 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in "Example Projects Key" section below before completing table. Place "X" under project key number for participation in same or similar role.) 1 2 3 4 5 6 7 8 9 10 Raj Krishnasamy, P.E. Principal-in-Charge, Principal Engineer X X X X X Francois Thomas, PE Principal Engineer X X X X X 29. EXAMPLE PROJECTS KEY NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) 1 Gateway Park Pedestrian Bridge, City of Sunny Isles Beach, Florida 6 2 Biscayne National Park, Convoy Point/Adams Key, Biscayne Keys, Florida 7 3 N. Miami Avenue Bridge Replacement, Miami-Dade County, Florida 8 4 Don Soffer School Flashing Signal, City of Aventura, Florida. 9 5 SW 42 Street (Bird Road Extension) From SW 162 Avenue to SW 157 Avenue, Miami-Dade County, Florida 10 Section E - Page | 60 H. ADDITIONAL INFORMATION 30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED. Company Profile TSF (Tierra South Florida, Inc.) is a full‐service consulting geotechnical engineering, construction materials testing and inspections firm with capabilities to provide test borings, engineering analyses and reports, AutoCAD and Microstation plan sheets, laboratory soils testing, and construction materials testing. Our services also include threshold/special inspections and roofing inspection services. The geotechnical and materials engineering services provide clients with the comprehensive range of siting, planning, design, construction and quality control disciplines required for major construction projects. Mr. Raj Krishnasamy, P.E. qualifies as a minority by Federal Guidelines. Mr. Krishnasamy is a licensed Engineer with 33 years of experience in geotechnical, material engineering and inspection services. TSF is a certified Disadvantaged Business Enterprise (DBE) with the Florida Department of Transportation (FDOT) and a certified Minority Business Enterprise (MBE) with the State of Florida’s Office of Supplier Diversity and the City of Orlando. Additionally, TSF is a certified Small Business Enterprise (SBE) with Pinellas County, the City of West Palm Beach, Palm Beach County, South Florida Water Management District (SFMWD) and the School District of PBC. Geotechnical Engineering TSF can provide a complete range of geotechnical engineering services. These services include site assessments, planning, field and laboratory investigations, design specifications and recommendations, quality control, instrumentation and performance studies. TSF will evaluate and then develop recommendations regarding both existing structures and new construction. Applications are for all types of buildings, airport facilities, transportation systems, landfills, dams, and other civil and private projects. TSF’s primary market is minority business set aside by City, County, State and Federal agencies. Construction Materials Engineering and Testing TSF offers materials engineering, testing and inspection services applicable to the governmental, construction and manufacturing industries. During construction, monitoring and quality control services will cover every phase of construction and all materials used. Our field and laboratory technicians hold industry‐recognized certifications (ACI/CTQP/PCI/FPCA) for aggregates, asphalt, concrete, and earthwork testing as well as drilled shaft, augercast pile, and pile driving monitoring. Laboratory Facilities TSF owns and operates two fully equipped in‐house soils, concrete, aggregate, and asphalt testing laboratories certified by Construction Materials Engineering Council (CMEC). Both TSF labs follow American Society for Testing and Materials (ASTM) and American Association of State Highway and Transportation Officials (AASHTO) standards and our West Palm Beach laboratory is also validated by FDOT and the United States Army Corp of Engineers (USACE). These laboratories provide specialized testing services associated with geotechnical engineering, and construction materials to better meet the needs of its clients. TSF’s laboratory facilities are designed and operated to provide fast, reliable information to assure the meeting of client's needs. The trained and certified laboratory staff will routinely perform physical properties testing of soil, rock, concrete, steel, asphalt, and composite building materials. These testing services are performed in support of all project phases, including site investigations and assessments, design, and construction. Corporate and Project Management Philosophy The TSF organization is committed to minimizing corporate administrative control which allows both branch management and specific technical teams to take correct and timely actions to meet the objectives of their clients. Employees stress quality, responsive services in which they will take a great deal of pride. Client satisfaction with the quality of TSF’s work, past and future, will result in a large percentage of work to be performed for repeat clients. Interaction with Regulatory Agencies TSF has an excellent working relationship with the FDOT as well as the SFWMD. When working within right of way of these agencies, TSF will submit an application for request of work permit and obtain the proper authorization prior to proceeding with work. TSF will then follow up with a meeting to explain the scope in detail and notify the agency at completion. The foregoing is a statement of facts. 31. SIGNATURE 32. DATE August 6, 2020 33. NAME AND TITLE Raj Krishnasamy, P.E., President/Principal Engineer Section E - Page | 61 ARCHITECT ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (If any) 20‐07‐01 PART II ‐ GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (OR BRANCH OFFICE) NAME TSF (Tierra South Florida, Inc.) 3. YEAR ESTABLISHED 2003 4. UNIQUE ENTITY IDENTIFIER 829296222 2b. STREET 16250 NW 59th Avenue, Suite 207 5. OWNERSHIP a. TYPE Corporation 2c. CITY Miami Lakes 2d. STATE FL 2e. ZIP CODE 33014 b. SMALL BUSINESS STATUS DBE ‐ FDOT UCP MBE ‐ Florida Statewide OSD & City of Orlando SBE – Pinellas County, Palm Beach County, City of West Palm Beach, SFWMD, SDPBC. SSBE ‐ CFX 6a. POINT OF CONTACT NAME AND TITLE Raj Krishnasamy, P.E., President/Principal Engineer 7. NAME OF FIRM (If block 2a is a branch office) N/A 6b. TELEPHONE NUMBER (561) 687‐8536 6c. E‐MAIL ADDRESS Raj@TSFGeo.com 8a. FORMER FIRM NAME(S) (If any) 8b. YR. ESTABLISHED 8c. UNIQUE ENTITY IDENTIFIER N/A N/A N/A 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function Code b. Discipline c. No. of Employees a. Profile Code b. Experience c. Revenue Index Number (see below) (1) FIRM (2) BRANCH 2 Administrative 6 6 S05 Soils and Geologic Studies; Foundations 6 8 CADD Technician 2 2 T02 Testing and Inspection Services 6 27 Foundation/Geotechnical Eng 7 7 58 Technician/Analyst 27 27 15 Construction Inspector 5 5 16 Construction Manager 2 2 Total 49 49 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) PROFESSIONAL SERVICES REVENUE INDEX NUMBER 1. Less than $100,000. 6. $2 million to less than $5 million 2. $100,000 to less than $250,000 7. $5 million to less than $10 million 3. $250,000 to less than $500,000 8. $10 million to less than $25 million 4. $500,000 to less than $1 million 9. $25 million to less than $50 million 5. $1 million to less than $2 million 10. $50 million or greater a. Federal Work 6 b. Non‐Federal Work 6 c. Total Work 7 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. a. SIGNATURE b. DATE August 6, 2020 c. NAME AND TITLE Raj Krishnasamy, P.E., President/Principal Engineer Section E - Page | 62 STANDARD FORM 330 (REV. 8/2016) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT 12. NAME Javier E. Bidot Cruz, PSM 13. ROLE IN THIS CONTRACT Professional Surveyor and Mapper and Contract Principal 14. YEARS EXPERIENCE a. TOTAL 29 b. WITH CURRENT FIRM 22 15. FIRM NAME AND LOCATION (City and State) Javier E Bidot & Associates, PSC, Corp Boca Raton, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) BS/1991/ Land Surveying & Mapping 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) PR/PSM License, FL/PSM License; USVI/PSM and NY/PSM License 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Bidot has headed as Project Principal and Technical Leader Surveyor of up to ten in-house and four subcontracted crews. All survey activities including but not limited to: ALTA/NSPS, Boundary, Topographic and As-built Surveying, Hydrographic Surveying and all types of construction layout, High Definition Surveys and Subsurface Utility Engineering Surveys. Supervision of a professional staff of up to ten surveyors, and an administrative staff of three. All administrative and managerial duties related to this position. He has over twenty years of Federal Government survey work at different levels. Project Manager and Principal in charge for various IDIQ Federal Contracts for USACE, US-DOJ, NRCS, USFW, NOAA. Admitted to the Local and Federal Court Circuit as Expert Witness in numerous times. His professional experience includes land development and construction management, contractor dispute resolution, as well as the scheduling of major residential and infrastructure projects. Licenses and Certificates: Professional Land Surveyor, PR Lic. #12972 Professional Land Surveyor and Mapper, FL Lic. #7111 Professional Land Surveyor, NY/PSM Lic. #050998-1 Professional Land Surveyor, USVI Lic #0-41929-1B Professional Utility Locator Certified - 2012 Hypack Certified – 2018 First Aid & CPR SEASCH-197 2014 Confined Space Entry OSHA Safety Training Certificate 2013 Excavation and Trenching OSHA Safety Training Certificate 2013 USPS Licensed Boat Operator 2009 Acknowledgements: • Distinguished Collegiate Recognition 2013 - CIAPR • Outstanding Project Recognition 2013 – CIAPR Santa Isabel Wind Farm Project • Caribbean Business “40 under 40” Recognition (2004 Edition) Associations: • Florida Surveyors and Mappers Association • National Society of Professional Surveyors • New York State Association of Professional Land Surveyors • Active Member of Puerto Rico Engineers and Land Surveyors Association and has provided continued education courses for the engineering and surveying community. Expert Witness Experience: Admitted as Expert Witness in: US Court of Federal Claims, Washington, DC and PR Judicial Courts (Carolina, Bayamon, Caguas Counties) • Mary Beth Katzin Simon, Annette Katzin and Rosemary Kjeldsen v. U.S.; Case No. 12-384L. Expert for the Defendant. • J. Colón, et als vs. Briseida Vicente Morento EAC 2015-0357. Expert for the Defendant. • Raymond Carlton Newton vs. Manuel Gonzalez del Pilar CIA2008-0030. Expert for the Plaintiff. • Diesel Machinery Contractor vs. Constructora Musan LCD- 1998-0045. Expert for the Defendant. • Ana María Sosa Morales vs. Irma Sosa de Jesús F-AC 1998-0177. Expert appointed by the Court. Section E - Page | 63 STANDARD FORM 330 (REV. 8/2016) 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Surveys in Puerto Rico, USVI and Florida; US Corps of Engineers (2) YEAR COMPLETED PROFESSIONAL SERVICES In progress CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm From January 2001 to 2012, and from 2019 to present he has served as Project Manager and Principal in charge for contracts with the Jacksonville District Corps of Engineers to perform hydrographic, topographic, cadastral and construction surveys in Puerto Rico, Florida and the US Virgin Islands. Over 40 delivery orders have been completed with a cumulative cost of more than 4M. His role on these projects is as Project Manager and Principal in charge. b. (1) TITLE AND LOCATION (City and State) Topographic, Hydrographic and ALTA/NSPS Boundary Survey, Multiple Municipalities, Lower La Plata, Puerto Rico (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) ((3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm This project demands experienced land surveying support for the study of the Lower La Plata River. The study includes a Topog raphic Survey, Dual Frequency Hydrographic Survey, Title Commitment study and Boundary Survey of over 100 adjacent properties. The value of this project was $477,000. His role in the project was as Project Manager and Principal in charge. c. (1) TITLE AND LOCATION (City and State) Topographic and Hydrographic Survey Support Services for South Florida Water Management District C-139 Flow Equalization Basin (FEB) Project; Hendry County, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Ground topographic information for LiDAR verification, recovery and establishment of survey control on the project area and the existing conditions survey of various structures, proposed access and/or proposed embankments within the project limits, as supplemental data to support the project development and augment previous surveys performed by others. The cost of these project was $207,000. His role in the project was as Project Manager and Principal in charge. d. (1) TITLE AND LOCATION (City and State) Via Verde Pipeline Project, Various Municipalities in Puerto Rico (2) YEAR COMPLETED PROFESSIONAL SERVICES 2011 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Topographic Survey and Plans and Specifications for Natural Gas Pipeline from Peñuelas to Cambalache and Cambalache to San Ju an, PR. The purpose of this survey was to serve as a route selection tool and as the base plans and specifications survey to be utilized for engineering design. The total alignment length was approximately 93 miles of which JEBA was responsible for hydrographic surv eys, and 38 segments of pipelines. The value of this project was $568,000.00. His role in this project was Project Manager and Principal in charge. e. (1) TITLE AND LOCATION (City and State) Herbert Hoover Dike (HHD) Various Survey Projects in Okeechobee, South Florida under an ID/IQ contract with the USACE. (2) YEAR COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Survey 09-140 – Herbert Hoover Dike Piezometers Topographic Survey at Palm Beach County, FL. The firm was the prime land surveying services consultant for the Herbert Hoover Dike Piezometers Topographic Survey (Reach 1, 3 and 7), Palm Beach County, FL. The Cost of this project was $152,451. Surveys 09-131 & 09-132 – Herbert Hoover Dike Land Side Survey at Palm Beach, Hendry and Glades County, FL . Firm was the prime land surveying services consultant for the Landside Topographic Survey of Reach 2 and 3 of the HHD Project, Palm Beach, Hendry and Glades County. The cost of this project was $ 415,822. Survey 09-159- Herbert Hoover Dike Lidar Project: The firm was the prime land surveying services consultant for the Herbert Hoover Dike Northwest Shore Aerial Photography and LIDAR Survey – Highland, Glades, and Okeechobee County, FL The cost of this project was $767,623. As the prime land surveying consultant, the firm was in charge of managing the project and complying with project deliverables. The firm also executed field data acquisition with its own equipment and in-house personnel, data processing, quality assurance, cartographic mapping and deliverable formatting and submittal. His role in this project was as Project Manager and Principal in charge. Section E - Page | 64 STANDARD FORM 330 (REV. 8/2016) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT 12. NAME Carlos Lebrón Cabrera 13. ROLE IN THIS CONTRACT Survey Manager 14. YEARS EXPERIENCE a. TOTAL 12 b. WITH CURRENT FIRM 9 15. FIRM NAME AND LOCATION (City and State) Javier E Bidot & Associates, PSC, Corp Boca Raton, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) BS/2008/Land Surveying and Mapping 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Puerto Rico/PSM License #23744, Florida/PSM License # LS7259 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Active Member of PR Engineers and Land Surveyors Association and the Florida Surveying and Mapping Society. Mr. Lebrón oversees the survey operation, supporting technical staff and subconsultants including and not limited to High Definition Surveys, ALTA/NSPS Surveys, Topographic Surveys, Subsurface Utility Surveys and Hydrographic Surveys, Horizontal and Vertical Control Network and Right of Ways Plans. He performs quality control of all survey documents, including survey plans, record plats, descriptions, and review of title commitments reports. Mr. Lebrón is U.T.A. Certified Advanced Professional Utility Locator and FAA Unmanned Aerial Systems Certified Pilot (Part 107). 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Topographic and Hydrographic Survey Support Services for South Florida Water Management District C-139 Flow Equalization Basin (FEB) Project; Hendry County, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Ground topographic information for LiDAR verification, recovery and establishment of survey control on the project area and t he existing conditions survey of various structures, proposed access and/or proposed embankments within the project limits, as supp lemental data to support the project development and augment previous surveys performed by others. The cost of this project was $207,000. His role in this project was Survey Manager. b. (1) TITLE AND LOCATION (City and State) Broward County Schools Capital Improvements Program, Broward County, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) ((3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm The work consisted of existing conditions, topographic and utility location, and identification (including GPR/SUE) surveys for capital improvement projects that included perimeter security, fire protection and site utilities. As the prime land surveying c onsultant, the firm was in charge of managing the project and complying with deliverables. The total cost of these projects was over $50,000. His role in the project was as Survey Manager. c. (1) TITLE AND LOCATION (City and State) Topographic, Existing Conditions and High Definition Surveys for 15 Virgin Islands Port Authority (VIPA) facilities in St. Thomas, St. John and St. Croix (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Perform the topographic, existing conditions and high definition surveys for VIPA facilities. Deliverables for this project included AutoDesk Revit models and AutoCad-based topographic and existing condition surveys. The cost of this project was $112,500. His role in this project was as Survey Manager. d. (1) TITLE AND LOCATION (City and State) Mahogany Road Reconstruction Project, St. Croix, USVI (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm The scope of this project was to perform the Topographic and Existing Conditions Survey for Mahogany Road, St Croix. As part of the reconstruction efforts of the Hurricane Maria and Irma, JEBA was retained for the survey of a two-lane road segment of approximately 5.75 miles. The cost of this project was $118,000. His role in this project was as Survey Manager. e. (1) TITLE AND LOCATION (City and State) Santa Isabel Wind Project, Santa Isabel, PR (2) YEAR COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm The work included, among other tasks, the ALTA/ACSM boundary surveys for a group of real estate parcels with an estimated are a of 6,000 acres to be made part of a wind farm. An aerial mapping task, for an area of 10,000 acres was also executed by firm to expedite the mapping of the surveyed parcels and other outlying areas of interest. The total cumulative cost of this project was $470,205. His role in the project was as Mapping Technician/Survey Manager. Section E - Page | 65 STANDARD FORM 330 (REV. 8/2016) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 1 21. TITLE AND LOCATION (City and State) Topographic and Hydrographic Survey Support Services for SFWMD C-139 Flow Equalization Basin (FEB) Project in Hendry County, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER Arcadis US Inc. b. POINT OF CONTACT NAME Mr. Paul Walansky, PE c. POINT OF CONTACT TELEPHONE NUMBER 561.697.7020 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Ground thruthing topographic information for LiDAR verification, recovery and establishment of survey control on the project area and the existing conditions survey of various structures, proposed access and/or proposed embankments within the project limits, as supplemental data to support the project development and augment previous surveys performed by others. Work was divided in five main tasks, and other supplementary activities outlined as subtasks: 1. Survey Base: a. AutoCAD Civil 3D (C3D) survey with current rectified aerial photo background imagery. b. Establish 2,800-acre project area lines from District-furnished boundary survey. c. Incorporate District-furnished LIDAR data into survey. d. Incorporate additional topographic and hydrographic survey data. e. Develop Civil 3D TIN Surface of existing ground. f. Create civil 3D existing ground contour lines at one-foot (1’) intervals for some specific areas. 2. Survey of Existing Features a. Establish survey control marks datum relationship (NAVD to NGVD) b.Existing improvements were located within the FEB project boundary. 3. Topographic Survey a. LIDAR Elevation Comparison b. Soil Borings and Piezometer Locations 4. Hydrographic Survey-Cross Sections As the prime land surveying consultant, the firm was in charge of managing the project and complying with deliverables. The total cost of these tasks was over $207,000. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME Javier E Bidot & Associates (2) FIRM LOCATION (City and State) Boca Raton, FL (3) ROLE PRIME; Professional Surveyor, Contract Admin Section E - Page | 66 STANDARD FORM 330 (8/2016) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects , if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 2 21. TITLE AND LOCATION (City and State) Broward County Schools Capital Improvements Program, Broward County, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER Song & Associates, Inc b. POINT OF CONTACT NAME Annmarie Mia Lonergan c. POINT OF CONTACT TELEPHONE NUMBER 561.951.7853 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The work consisted of existing conditions, topographic and utility location and identification (including GPR/SUE) surveys for capital improvement projects that included perimeter security, fire protection and site utilities. As the prime land surveying consultant, the firm was in charge of managing the project and complying with deliverables. The total cost of these projects was over $50,000. Project Location Site Survey-Margate Elementary School Margate, FL Site Survey-Plantation High School Plantation, FL Site Survey, Utilities and Digital CAD Mapping-JP Taravella High School Coral Springs, FL Site Survey – Country Hills Elementary School Coral Springs, FL Site Survey- Hallandale Beach High School Hallandale, FL Existing Conditions and Topographic Survey at Seagull Alternative High School Fort Lauderdale, FL Site Survey for Park Trails Elementary School Parkland, FL Site Survey- West Glades Middle School Parkland, FL Existing Conditions, Topographic and Subsurface Utility Survey for Pinewood Elementary School N.Lauderdale, FL Existing Conditions and Topographic Survey for Sunrise Village Elementary School Sunrise, FL 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME Javier E Bidot & Associates (2) FIRM LOCATION (City and State) Boca Raton, FL (3) ROLE PRIME; Professional Surveyor, Contract Admin Section E - Page | 67 STANDARD FORM 330 (REV. 8/2016) F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects , if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 3 21. TITLE AND LOCATION (City and State) Topographic, Hydrographic and ALTA/NSPS Boundary Survey, Multiple Municipalities, Lower La Plata, Puerto Rico 22. YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER US Army Corps of Engineers b. POINT OF CONTACT NAME Mr. Darin Moore, PSM c. POINT OF CONTACT TELEPHONE NUMBER 904.232.2471 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) This project demands experienced land surveying support for the study of the Lower La Plata River. The study includes a Topographic Survey, Dual Frequency Hydrographic Survey, Title Commitment study and Boundary Survey of over 100 adjacent properties. Bringing together multiple parts of land surveying in a complete and high-quality package is just part of everyday work at Javier E. Bidot and Associates. The difficult terrain and rapid currents in and around the river made it a challenge worthwhile for our professionals’ time and experience. Contract Amount: Approx. $487,000 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME Javier E Bidot & Associates (2) FIRM LOCATION (City and State) Caguas, PR (3) ROLE PRIME; Professional Surveyor, Contract Admin Section E - Page | 68 STANDARD FORM 330 (REV. 8/2016) G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 26. NAMES OF KEY PERSONNEL (From Section E, Block 12) 27. ROLE IN THIS CONTRACT (From Section E, Block 13) 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in "Example Projects Key" section below before completing table. Place "X" under project key number for participation in same or similar role.) 1 2 3 4 5 6 7 8 9 10 Javier E Bidot, PSM Professional Surveyor X X X Carlos Lebron, PSM Survey Manager X X X 29. EXAMPLE PROJECTS KEY NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) 1 Topographic and Hydrographic Survey Support Services for SFWMD C-139 Flow Equalization Basin (FEB) Project in Hendry County, FL 6 2 Broward County Schools Capital Improvements Program, Broward County, FL 7 3 Topographic, Hydrographic and ALTA/NSPS Boundary Survey, La Plata, PR 8 4 9 5 10 Section E - Page | 69 STANDARD FORM 330 (REV. 8/2016) PAGE 1 H. ADDITIONAL INFORMATION 30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED. A.EXPERIENCE AND QUALIFICATIONS OF THE FIRM Javier E. Bidot & Associates (JEBA) is a land surveying, hydrographic, and utility mapping firm with office in the Municipality of Caguas, Puerto Rico, and a branch office in Boca Raton, Florida. The present response is based on the Boca Raton branch office as the primary location for services to be performed under this contract. JEBA is a small business concern, DOT certified as a Disadvantaged Small Business (DBE), and HUBZone certified. JEBA is also a Florida Certified Minority Supplier, a South Florida Water Management District Certified Small Business Enterprise and has been certified as Disadvantage Business Enterprise through the Florida Unified Certification Program. JEBA, is admitted to the practice of Land Surveying and Mapping in the State of Florida as Licensed Business #LB8193, and is also Puerto Rico Professional Services Corporation No. 921CP. In the last 23 years, JEBA has catered to federal, state and municipal government organizations and the private sector for large scale infrastructure, transportation, utilities, topographic and engineering surveys. JEBA’s compliance with expertise requirements for this contract are substantiated on the resumes of in- house and subconsultant key persons, on Section E of this SF-330. The breadth and depth of the JEBA’s team expertise is documented on Section F, of this present SF-330, as well as below. 1.Boundary Surveys JEBA has vast specialized experience in performing legal boundary surveys and producing cadastral maps and is highly qualified to provide these types of surveys for the City of Miami Beach. JEBA’s principal, Javier Bidot, a licensed professional surveyor in Puerto Rico, Florida, New York and USVI, has been issued contracts as expert witness in boundary cases by the US Department of Justice, Environmental and Natural Resources Division, and by the US Department of Justice, US Attorney’s Office, Civil Litigation Division, which attest as to the qualifications, solid track record and specialized experience in performing legal boundary surveys and producing cadastral maps of its team. (Contracts #DJJ-14W-ENR01-0053, and 15JA69-18-PR-042) The US Fish and Wildlife Service awarded JEBA a 5-year, 5 MM contract # 401816D005 for surveying services, and as recently as 2017, after the completion of the contract it had issued task orders for two legal boundary surveys and consulting cases. JEBA’s Boca Raton office is active performing ALTA/NSPS Real Estate Boundary Surveys for a select group of private clients. Section E - Page | 70 STANDARD FORM 330 (REV. 8/2016) PAGE 2 Snapshot of a sample of a Real Estate Boundary Survey; ALTA/NSPS Standards Land Title Survey for Cumberland Farms at 5000 N Lauderhill, Florida (2017) Snapshot of a sample of a Real Estate Boundary Survey; ALTA/NSPS Standards Land Title Survey for Cumberland Farms at Ft. Pierce, FL (2018) Section E - Page | 71 STANDARD FORM 330 (REV. 8/2016) PAGE 3 Firm was the prime land surveying services consultant for the Santa Isabel Wind Project in Santa Isabel Puerto Rico. The work included, among other tasks, the ALTA/ACSM boundary surveys for a group of real estate parcels with an estimated area of 6,000 acres to be made part of a wind farm. An aerial mapping task, for an area of 10,000 acres was also executed by firm to expedite the mapping of the surveyed parcels and other outlying areas of interest. Adjacent lands and the lands between the different areas to be surveyed were of interest to the project. The firm also executed field data acquisition, data processing, quality assurance, cartographic mapping and deliverable formatting and submittal. The total cumulative cost of this project was $470,205.00. This project was selected as the OUTSTANDING Project of the Year by the College of Engineers and Surveyors of PR in 2013. A sample list of clients for which we provide legal boundary surveys and cadastral maps either directly or through their agents are as follows: •The Simon Group •DDR •US Marshals Service •US Fish and Wildlife Service •Cox-Levin (Over 35 cell tower sites) •The Bateman Civil Survey (Over 15 cell tower sites and Caribbean Distillers Project in Florida) •Puerto Rico National Guard •PUMA Energy Caribe •Puerto Rico Electric Power Authority •Puerto Rico Aqueduct and Sewer Authority (Arcadis/MPPR) •Puerto Rico Department of Natural Resources •Puerto Rico Highway Authority •General Services Administration •Municipality of Mayaguez JEBA has also produced land titles boundary surveys in the USVI. Section E - Page | 72 STANDARD FORM 330 (REV. 8/2016) PAGE 4 2.Topographic Surveys As for topographic surveys, JEBA has performed a substantial quantity of topographic surveys for the Jacksonville District Corps of Engineers and other private clients. Large scale topographic work has been performed in Puerto Rico, the US Virgin Islands and Florida. Please refer to the list of recent projects below: •Existing Conditions and Topographic Survey for Cumberland Farms at Port St Lucie, Florida •Existing Conditions and Topographic Survey for Sunrise Village Elementary School; Sunrise, Florida •Topographic, Existing Conditions and High Definition Surveys for 15 Virgin Islands Port Authority facilities in St. Thomas, St. John and St. Croix •Topographic, Existing Conditions and Subsurface Utility for the Crowley Marine Terminal Located in Charlotte Amalie, St Thomas, USVI •Topographic & Hydrographic Survey Red Point Revetment, Saint Thomas (USVI) Snapshot of ALTA/ACSM Land Title Survey for A&E Design Services for the Capital Security Enhancement Project at the Ron de Lugo Federal Building and United States Courthouse, Charlotte Amalie, USVI Section E - Page | 73 STANDARD FORM 330 (REV. 8/2016) PAGE 5 3. Platting and Mapping With a fully bilingual staff, JEBA caters to local and stateside firms and agencies which rely on JEBA for their real estate acquisition maps needs. As an example, we have produced the real estate acquisition maps for the Jacksonville District Corps of Engineers in large scale projects such as Rio La Plata, Rio Puerto Nuevo, Rio Matilde and Rio Descalabrado Flood Control projects. Firm was the prime land surveying services consultants for the Real Estate Land Acquisition, Plans and Specifications, Hydrographic, and Topographic Survey, Subsurface Utility, Geodetic and Boundary Surveys for Rio Puerto Nuevo Project under a ID/IQ contract with the Jacksonville District Corps of Engineers. The cumulative value of this project was $ 441,514.00. 4.Flood Plain Studies As discussed previously, JEBA have been contracted since 2001 by US Corps of Engineers for more than 35 work orders totalling approximately 4M mainly for Flood Plain Study projects. Recently, JEBA performed Rio La Plata Topographic, Hydrographic and ALTA/NSPS Boundary Survey. This include Title Commitment study and Boundary Survey of over 100 adjacent properties. ( See Section F Example Project #3 for a more detailed description) Snapshot of Boundary, Existing Conditions, Topographic and Subsurface Utility Survey for Vacant Lot at Clarcona-Ocoee Rd, Orange County, Florida. (2018) Section E - Page | 74 STANDARD FORM 330 (REV. 8/2016) PAGE 6 5.Other Services Subsurface Utility Surveys JEBA started performing SUE surveys on 2008 , and has SUE Certified personnel at its Florida and Puerto Rico offices. The American Society of Civil Engineers, under specification 3802, has defined the discipline of Subsurface Utility Engineering as the management of risks and databases pertaining to the utility and underground asset mapping at various Quality Levels, among other technical parameters to which JEBA adheres to and holds as technical guideline. The following is the list of existing Quality Levels for the diverse utility mapping tasks possible under this discipline: Quality Level D – Typically referred to as the research and consultation of the diverse sources of records and maps and reporting them to the project owner or Engineer. Quality Level C – This level adds the survey of the assets based only on the above ground evidence. This includes the location of poles, manholes, hydrants, etc, graphically represented in the context of existing records. Quality Level B – This level adds to the record research and land survey, the designation of underground assets by means of diverse forms of induction, including but not limited to sound and electromagnetic induction, ground penetrating radar, etcetera. Quality Level A – This level of survey adds the physical uncovering of assets for verification by various means including but not limited to hand excavation, vacuum excavation and others. This level provides the highest level of accuracy and is the most expensive modality of utility surveys. JEBA is capable of performing all 4 types of quality levels of SUE asset designation, plus the evaluation of assets with company-owned zoom cameras. From its SUE designation work, JEBA will produce an engineering grade deliverable of meaningful importance to the client in order to make informed significant decisions regarding utility conflicts, upgrades connection, and avoidance strategies. Through a comprehensive training program for its field personnel, which are all certified professional utility locators, JEBA is recognized as an authority in providing SUE surveys for the A&E market in Puerto Rico. Recognizing SUE surveys are directly related to the engineering field, JEBA has a licensed engineer on staff as part of its SUE survey team. JEBA has also exported its SUE surveys capabilities to Florida, where it has performed for private clients and the Broward County Public Schools District, through its consultants; and to the USVI where it has performed subsurface utility surveys for PUMA Energy facilities, and others for clearance for environmental sampling drilling. Presently, JEBA owns three ground penetrating radar (GPR) units and related electronic, ferromagnetic and ultrasound subsurface utility prospecting equipment. Section E - Page | 75 STANDARD FORM 330 (REV. 8/2016) PAGE 7 Subsurface utility survey performed at Village Elementary School in Sunrise, Florida as part of the Broward County Public Schools Capital Improvement Program. JEBA has significant specialized experience, expertise and an excellent track record working with SUE surveys and utilities mapping, including the high-profile projects shown on the list below: •Boundary, Existing Conditions, Topographic and Subsurface Utility Survey for Vacant Lot at Clarcona-Ocoee Rd, Orange County, Florida. •Existing Conditions, Topographic and Subsurface Utility Survey for Pinewood Elementary School, North Lauderdale, Florida •Subsurface Utility Survey for Hangar 21, adjacent to the Crowley Isla Grande Upland Improvements Project, San Juan •Hydraulic Reconnaissance and Sewer Inspection of Sanitary System in the Isla Verde, Ocean Park, Villa Palmeras and Condado Areas. •Subsurface Utility Exploration and Topographic and Survey Plan for the Interstate Access Request, Analysis and Preliminary Design of Improvements to Intersection PR-2 and San Juan St (RUM Entrance-La Vita); Municipality of Mayaguez, PR •Utility Existing Conditions for the Villa Nueva Storm Sewer Trunk Line, Municipality of Caguas, PR •Subsurface Utility Survey for US Coast Guard Sector San Juan; PR •Subsurface Utility Survey Pirate's Cove; St Thomas USVI •Subsurface Utility Survey of the Offsite Transmission Line for the Irradia Morovis PV Solar Project, Morovis, PR. •Underground Utility Survey to assist drilling for soil borings at Metro Motors, SC Inc, St. Croix Section E - Page | 76 STANDARD FORM 330 (REV. 8/2016) PAGE 8 High Definition Surveys JEBA performs High Definition Surveys (HDS) with its 3 terrestrial LiDAR scanners. JEBA will format its HDS point clouds into different types of deliverables from two-dimensional site plans to LOD 200 and above building information models (BIM), based on the client preferences. Boundary, Topographic, Existing Conditions and High Definition (Terrestrial LiDAR) Survey for Caguas Expressway Motors. Full facilities BIM was produced for this project. (2017) Section E - Page | 77 STANDARD FORM 330 (REV. 8/2016) PAGE 9 On 2017, JEBA was directly involved with the emergency relief and restoration efforts in the USVI Ports Authority (VIPA) by performing high definition surveys on over 15 VIPA structures. GIS JEBA has also performed sizeable GIS projects for utility operators, land use planning and for the National Levee Database and Cerrillos Dam Breach Assessment task orders for the Jacksonville District. B.EXPERIENCE AND QUALIFICATIONS OF THE TEAM JEBA has included resumes of its key persons and team members proposed for this contract in the form of Section E of this SF-330. VIPA- Virgin Islands Ports Authority Henry Rolhsen International Airport Building facility in St Croix, as a sample of terrestrial LiDAR and BIM production for facilities ravaged by hurricanes Maria and Irma. Section E - Page | 78 STANDARD FORM 330 (REV 8/2016) ARCHITECT ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (If any) RFQ No. 20-07-01 PART II - GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (OR BRANCH OFFICE) NAME Javier E. Bidot & Associates, PSC 3. YEAR ESTABLISHED 1997 4. DUNS NUMBER 134404974 2b. STREET 2385 NW Executive Center Dr Suite 100 5. OWNERSHIP a. TYPE Corporation 2c. CITY Boca Raton 2d. STATE FL 2e. ZIP CODE 33431 b. SMALL BUSINESS STATUS Minority Owned Small Business HUBZone, DOT Certified DBE 6a. POINT OF CONTACT NAME AND TITLE Javier E. Bidot Cruz, PSM (Principal) 7. NAME OF FIRM (If block 2a is a branch office) 6b. TELEPHONE NUMBER 561.962.2851 6c. E-MAIL ADDRESS jbidot@jebpr.com 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function Code b. Discipline c. No. of Employees a. Profile Code b. Experience c. Revenue Index Number (see below) (1) FIRM (2) BRANCH 02 Administrative 2 A02 Aerial Photography, Airborne Data & Imagery Collection 1 38 Registered Surveyors 2 C16 Construction Surveying 1 12 Civil Engineer 1 G03 Geodetic Surveying 1 38 Land Surveyors 10 G04 GIS; Development, Analysis & Data Collection 1 Rodman/Instrumentman 9 G05 Geospatial Data Collection; Scanning 4 H13 Hydrographic Surveying 2 L02 Land Surveying 2 P03 Photogrammetry 1 S10 Surveying; Platting; Mapping; Flood Plain Studies 4 T04 Topographic Surveying & mapping 3 Subsurface Utility Survey 2 Total 24 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) PROFESSIONAL SERVICES REVENUE INDEX NUMBER 1. Less than $100,000.6. $2 million to less than $5 million 2. $100,000 to less than $250,000 7. $5 million to less than $10 million 3. $250,000 to less than $500,000 8. $10 million to less than $25 million 4. $500,000 to less than $1 million 9. $25 million to less than $50 million 5. $1 million to less than $2 million 10. $50 million or greater 4 a. Federal Work 3 b.Non-Federal Work 5 c.Total Work 5 12. AUTHORIZED REPRESENTATIVE the foregoing is a statement of facts. a. SIGNATURE b. DATE 08/07/2020 c. NAME AND TITLE Javier E Bidot Cruz, PLS (Principal) Section E - Page | 79 ARCHITECT – ENGINEER QUALIFICATIONS PART I – CONTRACT SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1. TITLE AND LOCATION (City and State) Continuing Professional Consulting Services, City of Sunny Isles Beach, Florida 2. PUBLIC NOTICE DATE July 8, 2020 3. SOLICITATION OR PROJECT NUMBER RFQ No. 20-07-01 B. ARCHITECT – ENGINEER POINT OF CONTACT 4. NAME AND TITLE Jeffrey O’Connor, P.E., Vice President Engineering 5. NAME OF FIRM Underwater Engineering Services, Inc. 6. TELEPHONE NUMBER 772-337-3116 7. FAX NUMBER 772-337-0294 8. E-MAIL ADDRESS joconnor@uesi.com C. PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors.) (Check) 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT PRIME J-V PARTNER SUBCON- TRACTOR a. X UESI [ ] CHECK IF BRANCH OFFICE 3306 Enterprise Road Fort Pierce, FL 34982 Structural Inspections Underwater Inspections b. c. d. e. D. ORGANIZATIONAL CHART OF PROPOSED TEAM [ ] (Attached) Section E - Page | 80 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Jeffrey O’Connor, PE 13. ROLE IN THIS CONTRACT Underwater Inspection Leader/Inspector 14. YEARS EXPERIENCE a. TOTAL 34 b. WITH CURRENT FIRM 7 15. FIRM NAME AND LOCATION (City and State) Underwater Engineering Services, Inc., Fort Pierce, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) B.S.C.E. / 1985 / Iowa State University 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) 1996 / Professional Engineer / FL / #50914 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) FHWA/NHI Certified Instructor for Underwater Bridge Inspection, Safety Inspection of In-Service Bridges & Bridge Inspection Refresher 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Structure Inspection Program – Underwater Component, SFWMD South Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If Applicable) NA (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Assignment: Underwater inspection of water control structures. Three task work orders included 23, 36 and 38 structures for FY17-18, FY18-19 and FY19-20, respectively, including culverts, spillways, pump stations, boat locks, and weirs. Fee to date $1M. Inspections performed with surface-supplied air. All inspection video and audio were recorded. Mr. O’Connor was the Project Manager and on-site engineer for this work. He also signed and sealed all of the reports. b. (1) TITLE AND LOCATION (City and State) Prof. Services for Topside & Underwater Routine and Fracture Critical Bridge Inspections, Bolton Perez (BPA – Prime) Miami, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (If Applicable) NA (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Assignment: Underwater structural assessments of five bridges as part of the Miami-Dade Transit Metromover train system. UESI provided a three-person dive team led by a registered Florida Professional Engineer-diver. The scope included all underwater elements, including piles, piers, footings, and fenders. Prepared report with elements and ratings similar to that used by FDOT. The contract amount was $14K. Mr. O’Connor was the Project Manager and performed the inspections. c. (1) TITLE AND LOCATION (City and State) FDOT Dist. 5 Local Gov’t. Bridge Inspections, Ayres Associates (Prime) East Central, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If Applicable) NA (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Assignment: Underwater structural assessments of three movable bridges located in and north of Daytona Beach, FL. The project also included performing underwater quality assurance inspections of three bridges. The contract amount was $9K. Mr. O’Connor was the Project Manager and performed the inspections of two of the movable bridges. d. (1) TITLE AND LOCATION (City and State) FDOT SR-206 / Crescent Beach Bridge Cathodic Protection, GPI (Prime) Crescent Beach, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If Applicable) NA (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Assignment: Underwater construction engineering inspection services for piles on the SR-206 Bridge over the Matanzas River. Thirty-six piles required cathodic protection jackets. UESI inspected all piles prior to the work to verify the plans; then inspected each pile at least twice – once prior to jacket install to check the cleanliness, the rebar, and anode connection - and once after jacket install. The contract amount was $39K. Mr. O’Connor was the Project Manager and led approximately 50% of the inspections. e. (1) TITLE AND LOCATION (City and State) Design Services for City Marina Pier Replacement City of Vero Beach, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (If Applicable) 2018 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Assignment: Design of repairs to the main pier at the City Marina. This project followed the inspection project also performed by UESI. Repairs were comprised of hardware replacement, stringer replacement, beam replacement, one bent replacement, and pile repairs. The fee was $16K. Mr. O’Connor was the Project Manager and lead designer of the repairs. STANDARD FORM 330 (1/2004) PAGE 2 Section E - Page | 81 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Marty Faulk, CBI 13. ROLE IN THIS CONTRACT Underwater Inspection Team Leader 14. YEARS EXPERIENCE a. TOTAL 14 b. WITH CURRENT FIRM 8 15. FIRM NAME AND LOCATION (City and State) Underwater Engineering Services, Inc., Fort Pierce, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) H.S Graduate. US Marine Corps Honorable Discharge 1988 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) 1995 / Certified Bridge Inspector / FL / #00317 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) NACE CIP Level II Inspector; ANSI N45.2.6 / ASTM D4537 Level III Coatings Inspector 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Structure Inspection Program – Underwater Component, SFWMD South Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If Applicable) YYYY (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Assignment: Underwater inspection of water control structures. Three task work orders included 23, 36 and 38 structures for FY17-18, FY18-19 and FY19-20, respectively, including culverts, spillways, pump stations, boat locks, and weirs. Fee to date $1M. Inspections performed with surface-supplied air. All inspection video and audio were recorded. Mr. Faulk was dive supervisor for approximately 30% of this work and assisted in the report development and video production. b. (1) TITLE AND LOCATION (City and State) FDOT Dist. 5 Local Gov’t. Bridge Inspections, Ayres Associates (Prime) East Central, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (If Applicable) YYYY (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Assignment: Underwater structural assessments of three movable bridges located in and north of Daytona Beach, FL. The project also included performing underwater quality assurance inspections of three bridges. The contract amount was $9K. Mr. Faulk was dive supervisor and performed the inspections of one movable bridge and the three QA bridges. c. (1) TITLE AND LOCATION (City and State) FDOT SR-206 / Crescent Beach Bridge Cathodic Protection, GPI (Prime) Crescent Beach, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If Applicable) YYYY (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Assignment: Underwater construction engineering inspection services for piles on the SR-206 Bridge over the Matanzas River. Thirty-six piles required cathodic protection jackets. UESI inspected all piles prior to the work to verify the plans; then inspected each pile at least twice – once prior to jacket install to check the cleanliness, the rebar, and anode connection - and once after jacket install. The contract amount was $39K. Mr. Faulk was dive supervisor for approximately 40% of the inspections. d. (1) TITLE AND LOCATION (City and State) FDOT I-295 Buckman Bridge Cathodic Protection, GPI (Prime) Jacksonville, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION (If Applicable) YYYY (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Assignment: Underwater construction engineering inspection services for piles on the I-295 Buckman Bridge over the St Johns River. Approximately 100 piles required cathodic protection jackets. UESI inspected each pile at least twice – once prior to jacket install to check the cleanliness, the rebar, and anode connection - and once after jacket install. The contract amount was $144K. Mr. Faulk was dive supervisor for approximately 40 of the 48 inspection trips. e. (1) TITLE AND LOCATION (City and State) Crane’s Roost Inspection, GAI Consultants (Prime) Altamonte Springs, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2013 CONSTRUCTION (If Applicable) NA (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Assignment: Underwater inspection of a pedestrian bridge, a floating stage, a tower overlook, and amphitheater. The structures were comprised of timber piles and sheetpiling. The stage was founded on floating docks assembled together. The fee for the services was $14K. Mr. Faulk led the inspections and wrote the condition report of findings. STANDARD FORM 330 (1/2004) PAGE 2 Section E - Page | 82 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Vince Trotta 13. ROLE IN THIS CONTRACT Underwater Inspector 14. YEARS EXPERIENCE a. TOTAL 26 b. WITH CURRENT FIRM 13 15. FIRM NAME AND LOCATION (City and State) Underwater Engineering Services, Inc., Fort Pierce, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) H.S Graduate 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Certification FHWA NHI Underwater Bridge Inspection Course; ANSI N45.2.6 Level II Coatings Inspector 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Structure Inspection Program – Underwater Component, SFWMD South Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If Applicable) NA (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Assignment: Underwater inspection of water control structures. Three task work orders included 23, 36 and 38 structures for FY17-18, FY18-19 and FY19-20, respectively, including culverts, spillways, pump stations, boat locks, and weirs. Fee to date $1M. Inspections performed with surface-supplied air. All inspection video and audio were recorded. Mr. Trotta was dive supervisor for approximately 30 structures and performed the inspection of two structures. b. (1) TITLE AND LOCATION (City and State) Prof. Services for Topside & Underwater Routine and Fracture Critical Bridge Inspections, Bolton Perez (BPA – Prime) Miami, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If Applicable) NA (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Assignment: Underwater structural assessments of five bridges as part of the Miami-Dade Transit Metromover train system. UESI provided a three-person dive team led by a registered Florida Professional Engineer-diver. The scope included all underwater elements, including piles, piers, footings, and fenders. Prepared report with elements and ratings similar to that used by FDOT. The contract amount was $14K. Mr. Trotta was the dive supervisor for the inspections. c. (1) TITLE AND LOCATION (City and State) Structure Inspections – Underwater Diving Services, SJRWMD East Central Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If Applicable) NA (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Assignment: Underwater inspection of 35 gated culverts and one boat lock. Inspections performed with surface-supplied air. All inspection video and audio were recorded. The structure elements were rated according to the District system. The contract fee was $274K. Mr. Trotta was dive supervisor for approximately 5 structures. d. (1) TITLE AND LOCATION (City and State) FDOT SR-206 / Crescent Beach Bridge Cathodic Protection, GPI (Prime) Crescent Beach, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If Applicable) NA (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Assignment: Underwater construction engineering inspection services for piles on the SR-206 Bridge over the Matanzas River. Thirty-six piles required cathodic protection jackets. UESI inspected all piles prior to the work to verify the plans; then inspected each pile at least twice – once prior to jacket install to check the cleanliness, the rebar, and anode connection - and once after jacket install. The contract amount was $39K. Mr. Trotta was the dive supervisor for one of the trips. e. (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If Applicable) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm STANDARD FORM 330 (1/2004) PAGE 2 Section E - Page | 83 AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (1/2004) PAGE 6 MANDATORY USE DATE OF FORM 6/2004 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 1 21. TITLE AND LOCATION (City and State) South Florida Water Management District Structure Inspection Program – Underwater Component Various sites in South Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) NA 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER South Florida Water Management District b. POINT OF CONTACT NAME Tjerk van Veen c. POINT OF CONTACT TELEPHONE NUMBER 561.682.2717 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Underwater Engineering Services, Inc. (UESI), UESI was selected by the South Florida Water Management District (SFWMD) to perform underwater condition assessments of water control structures. The work orders to date have included the inspection of 23, 36 and 38 structures for FY17-18, FY18-19 and FY19-20, respectively, including culverts, spillways, pump stations, boat locks, and weirs. The professional engineering fee to date has totaled $1M. A UESI Florida professional engineer was on site at all times supervising the dive operation and providing an engineering assessment. The diving operation was surface supplied with full video and audio communication. As part of the deliverable UESI furnished raw videos, edited with title pages. The inspection data and photographs were entered into the District’s Archival Tool. A metadata file (in Excel form) was provided that listed the team members, dates, and a summary of the structure deficiencies and recommended repairs. This project had underwater and topside condition assessments of water control structures – which would be similar to bridge elements or seawalls. Ratings followed a system set up by the District. Inspections for Sunny Isles would follow those set up by FHWA and FDOT, which would be similar. This project included recorded video and audio of the inspection, which may or may not be required for the Sunny Isles project. Team experience: Mr. O’Connor was the Project Manager and on-site engineer for this work. Mr. Faulk was dive supervisor for approximately 30% of this work. Mr. Trotta was dive supervisor for approximately 30 structures, and performed the inspection of several structures. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME UESI, Inc. (2) FIRM LOCATION (City and State) Fort Pierce, FL (3) ROLE Prime b. c. Section E - Page | 84 AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (1/2004) PAGE 6 MANDATORY USE DATE OF FORM 6/2004 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 2 21. TITLE AND LOCATION (City and State) Prof. Services for Topside & Underwater Routine and Fracture Critical Bridge Inspections (sub to BPA for Miami-Dade County) Miami, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (If applicable) NA 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER Miami-Dade County b. POINT OF CONTACT NAME Jake Perez, PE c. POINT OF CONTACT TELEPHONE NUMBER 305.392.3190 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Underwater Engineering Services, Inc. (UESI), UESI performed as a subconsultant to BPA and provided professional engineering inspection services for underwater structural assessments of five bridges as part of the Miami-Dade Transit Metromover train system. UESI provided a three-person dive team led by a registered Florida Professional Engineer-diver. The scope included all underwater elements, including piles, piers and footings. The entire fender system (above and below water) was inspected for one bridge. A report was prepared for each structure which included photographs, findings, recommendations and element checklists and ratings similar to that used by the Florida DOT. The contract amount was $14K This project had underwater and topside condition assessments of bridges. Ratings followed the system used by FHWA and FDOT. Team experience: Mr. O’Connor was the Project Manager and performed the inspections. Mr. Trotta was dive supervisor. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME UESI, Inc. (2) FIRM LOCATION (City and State) Fort Pierce, FL (3) ROLE Subconsultant b. c. Section E - Page | 85 AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (1/2004) PAGE 6 MANDATORY USE DATE OF FORM 6/2004 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 3 21. TITLE AND LOCATION (City and State) FDOT District 5 Local Government Bridge Inspections East Central, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) NA 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER Florida Department of Transportation b. POINT OF CONTACT NAME Rick Maslyn, CBI c. POINT OF CONTACT TELEPHONE NUMBER 813.978.8688 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Underwater Engineering Services, Inc. (UESI), UESI performed as a subconsultant to Ayres Associates and provided professional engineering inspection services for underwater structural assessments of three movable bridges located in and north of Daytona Beach, FL. The project also included performing underwater quality assurance inspections of three bridges. UESI provided a three-person dive team. Two of the movable bridges were led and inspected by a registered Florida Professional Engineer-diver. The third movable bridge was led and inspected by a Florida Certified Bridge Inspector. The scope included all underwater elements, including piles, piers, footings and fender systems. A report was prepared for each structure which included photographs, findings, recommendations and element checklists and ratings similar to that used by the Florida DOT. The quality assurance inspections were done by a three-person dive team led by a Florida Certified Bridge Inspector. The deficiency notes from the regular underwater bridge inspections were reviewed and verified by the QA team. The contract amount was $9K This project had underwater and topside condition assessments of bridges. Ratings followed the system used by FHWA and FDOT. Team experience: Mr. O’Connor was the Project Manager and performed the inspections of two of the movable bridges. Mr. Faulk was dive supervisor and performed the inspections of one movable bridge and the three QA bridges. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME UESI, Inc. (2) FIRM LOCATION (City and State) Fort Pierce, FL (3) ROLE Subconsultant b. c. Section E - Page | 86 AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (1/2004) PAGE 6 MANDATORY USE DATE OF FORM 6/2004 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 4 21. TITLE AND LOCATION (City and State) FDOT SR-206 / Crescent Beach Bridge Cathodic Protection Crescent Beach, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) NA 23. PROJECT OWNER'S INFORMATION a. PROJECT OWNER Florida Department of Transportation b. POINT OF CONTACT NAME Don Buwalda c. POINT OF CONTACT TELEPHONE NUMBER 386.623.5186 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Underwater Engineering Services, Inc. (UESI), UESI performed as a subconsultant to Greenman-Pedersen, Inc. and provided construction engineering inspection services for piles on the SR-206 Bridge over the Matanzas River, Crescent Beach, FL. UESI provided a three-person dive team utilizing surface-supplied air on a work vessel for all of the work. Thirty-six piles required cathodic protection jackets. UESI inspected each pile at least twice. Prior to the work, UESI inspected each pile to verify the damage as listed in the repair plans. The first inspection on a pile was performed after the pile had been cleaned, the new rebar cage was installed and before the jacket was installed. UESI checked for removal of all marine growth, rebar cage installation per plans, and anode connections per plans. A final inspection was performed on the completed pile jackets. UESI inspected for formwork or bottom blowout of grout and mounting and connections of the anodes. Additional inspections were done as necessary to verify corrections of defective work. The contract amount was $39K This project had underwater construction inspection of bridge piles as the Owner’s representative. Team experience: Mr. O’Connor was the Project Manager and led approximately 50% of the inspections. Mr. Faulk was dive supervisor for approximately 40% of the inspections. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME UESI, Inc. (2) FIRM LOCATION (City and State) Fort Pierce, FL (3) ROLE Subconsultant b. Greenman-Pedersen, Inc. Jacksonville, FL Prime c. Section E - Page | 87 G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 26. NAMES OF KEY PERSONNEL (From Section E, Block 12) 27. ROLE IN THIS CONTRACT (From Section E, Block 13) 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in “Example Projects Key” section below before completing table. Place “X” under project key number for participation in same or similar role.) 1 2 3 4 5 6 7 8 9 10 Jeffrey O’Connor, PE (UESI) Underwater Inspection Leader / Inspector X X X X Marty Faulk, CBI (UESI) Underwater Inspection Team Leader X X X Vince Trotta (UESI) Underwater Inspector X X X 29. EXAMPLE PROJECTS KEY NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) 1 Structure Inspection Program – Underwater Component, SFWMD, South Florida 6 2 Prof. Services for Topside & UW Routine and F.C. Bridge Inspections (Miami-Dade Co.), Bolton Perez (Prime) 7 3 FDOT Dist. 5 Local Gov’t. Bridge Inspections, Ayres Associates (Prime), East Central Florida 8 4 FDOT SR-206 / Crescent Beach Bridge Cathodic Protection, GPI (Prime), Crescent Beach, FL 9 5 10 Section E - Page | 88 H. ADDITIONAL INFORMATION 30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED. I. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. 31. SIGNATURE 32. DATE 8/7/2020 33. NAME AND TITLE Jeffrey O’Connor, PE, Vice President STANDARD FORM 330 (6/2004) PAGE 5 Digitally signed by Jeffrey H. OConnor Date: 2020.08.07 14:29:19 -04'00' Section E - Page | 89 ARCHITECT ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (If any) CONTRACT NO: 20-07-01 PART II - GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (OR BRANCH OFFICE) NAME 3. YEAR ESTABLISHED 4. DUNS NUMBER Underwater Engineering Services, Inc. 1984 78-297-0958 2b. STREET 5. OWNERSHIP 3306 Enterprise Road a. TYPE b. SMALL BUSINESS STATUS Corporation N/A 2c. CITY 2d. STATE 2e. ZIP CODE 7. NAME OF FIRM (If block 2a is a branch office) Fort Pierce FL 34982 6a. POINT OF CONTACT NAME AND TITLE 8a. FORMER FIRM NAME(S) (If any) Jeffrey O’Connor, P.E., Vice President Engineering S. G. Pinney & Associates 6b. TELEPHONE NUMBER 6c. E-MAIL ADDRESS 8b. YR. ESTABLISHED 8c. DUNS NUMBER 772-337-3116 joconnor@uesi.com 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function Code b. Discipline c. No. of Employees a. Profile Code b. Experience c. Revenue Index # (1) FIRM (2) BRANCH 02 Administrative 6 12 Civil Engineer Note 1) 1 15 Construction Inspector 16 Construction Manager (Note 2) 9 18 Cost Engineer/Estimator 2 48 Project Manager 57 Structural Engineer Certified Bridge Inspector/Diver 1 Coatings Specialist (Note 3) 22 Divers (Note 4) 39 Other Employees 5 NOTES: 1. Civil Engineer is also a diver 2. 8 Constr. Mgrs are also divers 3. 11 Coatings Spcl. are also divers Total number of divers is 62 Total 85 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) PROFESSIONAL SERVICES REVENUE INDEX NUMBER 1. Less than $100,000 6. $2 million to less than $5 million 2. $100,00 to less than $250,000 7. $5 million to less than $10 million 3. $250,000 to less than $500,000 8. $10 million to less than $25 million 4. $500,000 to less than $1 million 9. $25 million to less than $50 million 5. $1 million to less than $2 million 10. $50 million or greater a. Federal Work 2 b. Non-Federal Work 8 c. Total Work 8 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. a. SIGNATURE b. DATE 8/7/2020 c. NAME AND TITLE Jeffrey O’Connor, P.E., Vice President Digitally signed by Jeffrey H. OConnor Date: 2020.08.07 14:29:51 -04'00' Section E - Page | 90 Firm Staff Degree Responsibility Availability Current Workload Status, Projected Completion Projected Workload Projected Completion RJB Paola Riveros BS PM/Transportation/Civil/Parks 65%I-95 at 6th Interchange 60% complete, Completion 7/27/22 Port St. Lucie Blvd Reconstruction 4/24/2024 RJB Robert J. Behar MS Principal in Charge/Transportation/Parks 55%NE 151 Street Imp.Final Plans, 1/2021 NE 151 Street Imp. Phase 2 12/31/2020 FAA/Civil Engineering RJB Juan H. Vazquez BS Quality Control/Assurance/FAA/FDOT 35%Cypress Weir Control Structure Ready to Advertise, 9/2020 Central Broward Water Control District Permit Reviews Ongoing Central Broward Water Control District Permit Reviews Ongoing Miami Gardens Stormwater Master Plan Update Final Report - 7/26/21 Turnpike Draiange Report 2/22/2021 RJB Jerry Piccolo BS Major Bridge/Seawall Design/Structures 25%PBC Annual Varies PBC Annual Varies RJB Nestor Santana BS Cost Estimating/Specs/Construction Management 85%Safe Routes to School Miami Lakes 9/1/2020 None Cypress Weir Control Structure Ready to Advertise, 9/1/2020 RJB Jose A. Peña MS PM / Structural Design/Threshold Insp.75%Cypress Weir Control Structure Ready to Advertise, 9/2020 MIA Bridge Rehabilitation 10/2021 S-40, S-41, S-44 Post Design Construction, 7/2022 RJB Rafael De Arazoza BS Traffic Studies 80%None Eliatha Church Traffic Study 12/31/2020 RJB Jasmani Riveron MS Roadway/Streetscape/Pavement 65%Summit Blvd Bridge Over LWDD E-3 Canal 65% Plans, 12/21 Summit Boulevard Roadway 5/6/2021 RJB Elmer Cardenas BS Water Resources/Environmental 80%Cutler Bay CEI Services 9/4/2020 NE 151 Street Imp. Phase 2 12/31/2020 RJB Carmelo Ramos BS Electrical/Lighting 65%Cypress Weir Control Structure Ready to Advertise, 9/2020 None RJB Rafael Droz Seda BS Threshold Inspections 80%None As needed None RJB Jossmel Cruz MS Structural Design 75%S-40, S-41, S-44 Post Design Construction, 7/2022 MIA Bridge Rehabilitation 10/2021 Cypress Weir Control Structure Ready to Advertise, 9/2020 RJB Hector Rosario BS Water Resources/Cost Estimates/Plans 75%Cypress Weir Control Structure Ready to Advertise, 9/2020 MIA Bridge Rehabilitation 10/2021 Preparation Miami Gardens Stormwater Master Plan Update Existing Conditions, 7/2021 RJB Michelle Leon BS Traffic & Data Collection / Construction Management 45%S-151 Structure Replacement Construction, 12/2020 None RJB Nanette Akyaz BS Plans Preparation 45%NE 151 Street Imp.Final Plans, 1/2021 NE 151 Street Imp. Phase 2 12/2020 RJB Joyce Ledan BS Plans Preparation 65%NE 151 Street Imp.Final Plans, 1/2021 NE 151 Street Imp. Phase 2 12/2020 RJB Zugeil Velez BS Construction Management / Document Control 90%Colbert Elementary School SRTS Construction, 8/2020 None Section E.3 – Availability & Workload RJB Hans Murzi MS PM / Water Resources 75% Section E - Page | 91 RJB Alejandro Medina BS Construction Management / Inspections 80%Miami Dade Traffic Ops Push Button Construction, 10/2020 None RJB Jaime Delgado Utility Coordination/Data Collection 75%I-95 at 6th Interchange 60% complete, Completion 7/27/22 Port St. Lucie Blvd Reconstruction 4/24/2024 RJB Angel Marinez BS Plans Preparation/Design 65%I-95 at 6th Interchange 60% complete, Completion 7/27/22 Port St. Lucie Blvd Reconstruction 4/24/2024 RJB Xamarah Seda Velez MS Plans Preparation/Design 65%I-95 at 6th Interchange 60% complete, Completion 7/27/22 Port St. Lucie Blvd Reconstruction 4/24/2024 RJB Logan Fasanella AA Construction Management / Inspections/Data Collection 90%SRTS Miami Lakes Elementary School Construction, 8/2020 None Firm Staff Degree Responsibility Availability Current Workload Status, Projected Completion Projected Workload Projected Completion TSF Raj Krishnasamy BS Geotechnical Engineering 30%SR 7.US 441 Transit Corridor Improvements 50%,12/2020 Widen HEFT North of Campbell Drive to North of Tallahassee Road 2021 Atlantic Blvd (PD&E Study) 80%, 9/2020 SR 802-Lake Worth Road at Haverhill Road 2021 TSF Francois Thomas BS Geotechnical Engineering 60%Seacrest Blvd. from NE 22nd St. to Gulfstream Blvd - 7112-20-031 70%, 10/2020 Key West Airport 2021 UM Intramural Fields Phase 2 50%, 12/2020 Lantana Airport 2021 Firm Staff Degree Responsibility Availability Current Workload Status, Projected Completion Projected Workload Projected Completion JEBA Javier E. Bidot Cruz BS Surveying 50%USACE Contract Tasks # 19-12, 19-226, 19-257, 20-032, 20-197 50%; 12/31/2020 USACE Contract Tasks # 20-172, 20-189, 20-197 3/30/2021 JEBA Carlos Lebrón Cabrera BS Surveying 50%USACE Contract Tasks # 19-12, 19-226, 19-257, 20-032, 20-197 50%; 12/31/2020 USACE Contract Tasks # 20-172, 20-189, 20-197 3/30/2021 Firm Staff Degree Responsibility Availability Current Workload Status, Projected Completion Projected Workload Projected Completion 2020-2021 SFWMD SIP Inspections October 2020 – May 2021 10%, Ongoing SFWMD SIP Inspections 2021-2022 SFWMD SIP Inspections October 2021 – May 2022 10%, Ongoing SFWMD SIP Inspections 2020-2021 SFWMD SIP Inspections October 2020 – May 2021 10%, Ongoing SFWMD SIP Inspections 2021-2022 SFWMD SIP Inspections October 2021 – May 2022 10%, Ongoing SFWMD SIP Inspections 2020-2021 SFWMD SIP Inspections October 2020 – May 2021 10%, Ongoing SFWMD SIP Inspections 2021-2022 SFWMD SIP Inspections October 2021 – May 2022 10%, Ongoing SFWMD SIP Inspections UESI Contract End date is 9/30/202260%Underwater InspectionsBSJeffrey O’Connor Contract End date is 9/30/2022 UESI Vince Trotta Underwater Inspections 60%Contract End date is 9/30/2022 UESI Marty Faulk, CBI Underwater Inspections 60% Section E - Page | 92 Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section E – Page | 93 E.4. Firm and Personnel Licenses, Certifications, Training and Awards R.J. BEHAR & COMPANY, INC. – Professional Licenses and Certifications R.J. Behar & Company, Inc. Lic. #: CA 8365 – Expiration: 2/28/2021 Robert J. Behar, PE Lic. #: PE 21755 – Expiration: 2/28/2021 Paola A. Riveros, PE Lic. #: PE 74249 – Expiration: 2/28/2021 Juan H. Vazquez, PE Lic. #: PE 51143 – Expiration: 2/28/2021 Jasmani Riveron, PE Lic. #: PE 73798 – Expiration: 2/28/2021 Rafael E. De Arazoza, PE Lic. #: PE 24487 – Expiration: 2/28/2021 Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section E – Page | 94 Hans J. Murzi, PE Lic. #: PE 67767 – Expiration: 2/28/2021 Elmer Cardenas, PE Lic. #: PE 62988 – Expiration: 2/28/2021 Jerry Piccolo, PE Lic. #: PE 22979 – Expiration: 2/28/2021 Jose A Peña-Ramos, PE Lic. #: PE 67863 – Expiration: 2/28/2021 Carmelo J. Ramos, PE Lic. #: PE 77953 – Expiration: 2/28/2021 Nestor Santana, PE Lic. #: PE 85785 – Expiration: 2/28/2021 Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section E – Page | 95 Technical Certifications Technical Certification Robert J. Behar, PE – FDOT Temporary Traffic Control (TTC) – 8/27/2023 Rafael E. De Arazoza, PE, PTOE Transportation Professional Certification Board Inc. Professional Traffic Operations Engineer (PTOE) Juan H. Vazquez, PE, PH, BCEE Board Certified Environmental Engineer Juan H. Vazquez, PE, PH, BCEE Professional Hydrologist Rafael E. Droz-Seda, PE Lic. #: PE 39228 – Expiration: 2/28/2021 Special Inspector Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section E – Page | 96 Paola Riveros, PE – University of Florida Transportation Institute – Designing Safer Roads for Pedestrians and Bicyclists WEBINAR Paola Riveros, PE – FDOT – Manual on Intersection Control Evaluation (ICE) Training for Managers/Approvers Paola Riveros, PE – FDOT Roundabouts Design Training Paola Riveros, PE – FDOT Temporary Traffic Control (TTC) – 10/10/2023 Hans Murzi, PE, CFM Certified Floodplain Manager – Exp.: 7/31/2022 Hans Murzi, PE, CFM Qualified Stormwater Management Inspector Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section E – Page | 97 CTQP Training History Report Nestor Santana, PE Report for: Nestor Santana TIN: S53563668 Report Date: 08/10/2020 Valid Qualifications Qualification Name Certificate Number Valid from Expires on Earthwork Construction Inspection - Level 1 2000555 01/28/2020 01/28/2025 Earthwork Construction Inspection - Level 2 2000293 01/30/2020 01/30/2025 Final Estimates - Level 1 N/A 05/17/2019 04/25/2024 Final Estimates - Level 2 N/A 04/25/2019 04/25/2024 QC Manager 2001645 05/07/2019 01/01/2099 Elmer Cardenas, PE, CEI Certified Environmental Inspector Expiration: 9/30/2020 Elmer Cardenas, PE, CEI EPA AHERA, 16-Hour training Asbestos in Buildings: Work Practices for Operations & Maintenance (O&M) Personnel FDOT – Temporary Traffic Control (TTC) Advanced Course – Expires: 06/13/2023 APNGA Portable Nuclear Gauge & U.S. D.O.T. Hazmat Certification Class Expires: 1/24/2023 Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section E – Page | 98 CTQP Training History Report Alejandro Medina Report for: Alejandro Medina TIN: M35201056 Report Date: 08/10/2020 Valid Qualifications Qualification Name Certificate Number Valid from Expires on Asphalt Paving Technician - Level 1 N/A 10/18/2016 01/11/2022 Asphalt Paving Technician - Level 1 N/A 10/18/2016 10/18/2021 Asphalt Paving Technician - Level 2 N/A 01/11/2017 01/11/2022 Concrete Field Technician - Level 1 N/A 06/29/2019 11/28/2023 Drilled Shaft Inspection N/A 11/01/2017 11/01/2022 Earthwork Construction Inspection - Level 1 N/A 02/24/2017 02/24/2022 Earthwork Construction Inspection - Level 2 N/A 03/10/2017 03/10/2022 Final Estimates - Level 1 N/A 07/20/2017 08/24/2022 Final Estimates - Level 2 N/A 08/24/2017 08/24/2022 Florida Department of Environmental Protection Stormwater Erosion and Sedimentation Control – Stormwater Management Inspector – No Expiration IMSA – Traffic Signal Technician Level I Expires: 01/21/2023 Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section E – Page | 99 CTQP Training History Report Michelle Leon, EI Report for: Michelle Leon TIN: L50054087 Report Date: 08/10/2020 Valid Qualifications Qualification Name Certificate Number Valid from Expires on Asphalt Paving Technician - Level 1 N/A 05/18/2015 10/22/2020 Asphalt Paving Technician - Level 2 N/A 10/22/2015 10/22/2020 Drilled Shaft Inspection N/A 09/17/2015 09/17/2020 Earthwork Construction Inspection - Level 1 2003479 07/31/2020 07/31/2025 Earthwork Construction Inspection - Level 2 N/A 09/11/2015 09/11/2020 Final Estimates - Level 1 N/A 05/21/2015 09/01/2020 Final Estimates - Level 2 N/A 09/01/2015 09/01/2020 Pile Driving Inspection N/A 12/05/2015 12/05/2020 APNA – Annual Refresher Training for Portable Nuclear Gauges – Expires: 09/06/2020 Florida Department of Transportation (FDOT) Critical Structures Construction Issues Expires: 03/08/2022 Stormwater Management Inspector – Not Expiration FDOT – Temporary Traffic Control (TTC) Advanced (Refresher Course) – Expires: 02/20/2023 Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section E – Page | 100 CTQP Training History Report Logan Fasanella Report for: Logan Fasanella TIN: F25453388 Report Date: 08/10/2020 Valid Qualifications Qualification Name Certificate Number Valid from Expires on Asphalt Paving Technician - Level 1 N/A 10/19/2015 10/22/2020 Asphalt Paving Technician - Level 2 N/A 10/22/2015 10/22/2020 Concrete Field Technician - Level 1 N/A 10/28/2015 10/28/2020 Drilled Shaft Inspection N/A 08/16/2017 08/16/2022 Earthwork Construction Inspection - Level 1 N/A 09/09/2015 09/09/2020 Earthwork Construction Inspection - Level 2 N/A 11/11/2015 11/11/2020 Final Estimates - Level 1 N/A 02/13/2019 10/05/2023 Final Estimates - Level 2 N/A 10/05/2018 10/05/2023 Pile Driving Inspection N/A 03/26/2016 03/26/2021 AMERICAN CONCRETE INSTITUTE ACI Concrete Transportation Construction Inspector In-Training – 06/15/2024 FDOT Temporary Traffic Control (TTC) Advanced (Refresher) Course – Expires: 8/27/2023 IMSA – Traffic Signal Inspector Expires: 1/21/2023 Stormwater Management Inspector No Expiration Date IMSA – Traffic Signal Technician Level I – Expires: 1/21/2023 Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section E – Page | 101 Zugeil Velez FDOT – Local Agency Program Professional (LAP) Services – Completed: 11/12/2018 FDOT – Equal Opportunity Compliance – Completed: 02/06/2019 FDOT – On the Job Training (OJT) – RCS Completed: 12/20/2018 FDOT – LAP Sub-Recipient Compliance Assessment Tool – Completed: 04/04/2019 FDOT – Local Agency Program Checklist Training, Construction Checklist, Specifications, and Greenbook – Completed: 4/01/2019 FDOT – New User Security Awareness Completed: 01/21/2019 Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section E – Page | 102 Other Certifications Florida Department of Transportation (FDOT) Technical Prequalification Letter – Expires: June 30, 2021 South Florida Water Management District (SFWMD) Small Business Enterprise (SBE) Expires: February 20, 2022 Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section E – Page | 103 Awards/Commendations/Publications R.J. BEHAR & COMPANY, INC. Mr. Robert J. Behar, PE was nominated Engineer of the Year by the Broward County Section of the Florida Engineering Society and was awarded the Ben Watts Award from the Florida Department of Transportation. Riverwalk South Regional Park – City of Fort Lauderdale RJ Behar provided full construction management services for the construction of the City of Fort Lauderdale Riverwalk South Regional Park. The scope included attending preconstruction meeting(s); reviewing and processing payment applications, approving schedule of values; monitoring and tracking the contractor’s work progress and schedule; requesting and reviewing schedule modifications to ensure the contractor maximized time and resources; maintaining and accurately monitoring logs (correspondence, submittals/ shop drawings, RFI’s, change orders, deficiency reports, payment applications); responding to contractor RFI’s in a timely manner; conducting and coordinating the technical review and return of contractor submittals in a timely manner; coordinating and monitoring inspection procedures and making site visits as necessary to accomplish same; assisting/coordinating with Utilities (BellSouth, FP&L, cable, etc.) and City Departments as required; attending neighborhood meetings and/or City Commission meetings as requested; determining the need for any change orders, providing summary and justification for change as well as cost estimates; assisting in negotiations with the contractor; conducting weekly/bi-weekly meetings to evaluate the contractor’s progress and to resolve issues; preparing and distributing meeting minutes; overseeing substantial and final inspections, preparing and tracking punch list items; reviewing and processing record drawings; and preparing certifications and close-out permits Commendation – City of Hialeah Continuing Contract Civil Engineering Utility Design Consulting Services - CEI Water/Sewer “Service performance: Excellent “ Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section E – Page | 104 Juan H. Vazquez, PE, PH, BCEE For the tenth year in a row, Mr. Vazquez is in the “Who’s Who book of Environmental Engineering, 2019”. He is a past president of the Association of Engineers and Land Surveyors of Puerto Rico, Florida Chapter (CIAPR). He was recognized as the Distinguished Engineer in 2014 by the Florida Chapter of the CIAPR. He is a past chair of the ACEC-FL South Florida Water Management District Liaison Subcommittee. Governor Rick Scott Commendations R.J. Behar & Company, Inc. Recognition as being included in the South Florida Business Journal’s list of top engineering firms. Ms. Paola Riveros, PE Congratulations receiving a 2014 Prudential Productivity Team Award. From: Mark C. Freeman FDOT Project Administrator To: Juan Vazquez Subject: US-1 Lateral Ditch Submittals “….amazing response times. Thank You.” Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section E – Page | 105 Subconsultants I-595 Final Design, Broward County, Florida – Press El Nuevo Dia Newspaper – Puerto Rico Drainage master plan update and complete drainage design for the entire corridor, stormwater management designs for seven out of eight design zones. Services included signalization design of twelve intersections and temporary signals, and lighting plans. Evaluating the existing signal timings at the intersections along SR-84 including Flamingo Road, Hiatus Road, Nob Hill Road, Pine Island Road, University Drive and Davie Road. The project was nominated for a Civil Engineering Award by the College of Engineers and Land Surveyors of Puerto Rico (CIAPR) Tierra South Florida, Inc. State of Florida, Department of State – Corporation Certificate Expires: 12/31/2020 Tierra South Florida, Inc. Board of Professional Engineers License No.: CA28073 – Expires: 2/28/2021 Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section E – Page | 106 Raj Krishnasamy, PE Board of Professional Engineers License No.: PE53567 – Expires: 2/28/2021 Francois J. Thomas, PE Board of Professional Engineers License No.: PE56381 – Expires: 2/28/2021 Tierra South Florida, Inc. Florida Department of Transportation (FDOT) Technical Prequalification Letter – Expires: 06/30/2021 Tierra South Florida, Inc. South Florida Water Management District (SFWMD) Small Business Enterprise (SBE) – Expires: 10/30/2021 Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section E – Page | 107 Javier E. Bidot & Associates, P.S.C., Corp. State of Florida, Department of State – Corporation Certificate Expires: 12/31/2020 Javier E. Bidot & Associates, P.S.C., Corp. Board of Professional Surveyors and Mappers Business License No.: LB8193 – Expires: 2/28/2021 Javier E. Bidot Cruz, PSM Board of Professional Surveyors and Mappers License No.: LS7111 – Expires: 2/28/2021 Carlos M. Lebron, PLS Board of Professional Surveyors and Mappers License No.: LS7259 – Expires: 2/28/2021 South Florida Water Management District (SFWMD) Small Business Enterprise (SBE) Expires: 05/29/2023 Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section E – Page | 108 Underwater Engineering Services, Inc. State of Florida, Department of State – Corporation Certificate Expires: 12/31/2020 Board of Professional Engineers License No.: CA3703 – Expires: 2/28/2021 Jeffrey H. O’Connor, PE Board of Professional Engineers License No.: PE50914 – Expires: 2/28/2021 Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section F Section F. Firm References and Similar Work Completed STREET NEIGHBORHOOD IMPROVEMENTS HIALEAH, FLORIDA CLIENT: Mr. Jose Sanchez Director, Streets Division City of Hialeah 5601 East 8th Avenue Hialeah, Florida 33013 Tel: (305) 687-2611 Fax (305) 687-2632 E-mail: JOSANCHEZ@hialeahfl.gov RJ BEHAR’S ROLE: Roadway design improvements, road- way reconstruction, streetscape, milling and resurfacing, drainage design, utility coordination, main- tenance of traffic, lighting design, decorative lighting, signing and pavement markings. PROJECT STARTED: 2000 PROJECT COMPLETED: Present COST/FEES PAID: > $3.5M CONSTR. COST: > $40M RJ BEHAR’S KEY PERSONNEL Robert J. Behar, PE Project Manager Juan H. Vazquez, PE, PH, BCEE Drainage Engineer Paola Riveros, PE Project Engineer Rafael DeArazoza, PE, PTOE Traffic Studies Kira Leon, PE Project Engineer Jerry Piccolo, PE Structural Engineer Jossmel Cruz Garcia, EI Miscellaneous Structures Michelle Leon, EI Project Engineer/Inspections Xamarah Seda Velez Designer Angel Marinez Designer Since the year 2000, RJ Behar & Company, Inc. (RJ Behar) has been designing street neighborhood improvements for the City of Hialeah. This is part of the continuous neighborhood improvement program the City has been conducting. Under this program, RJ Behar has completed more than 50 miles of City street improvements. The projects have consisted of roadway reconstruction with some milling and resurfacing, curb and gutter type f, valley gutter, sidewalks, on- street parking, exfiltration drainage system, storm sewers, sodding, signing and pavement markings and roadway lighting. Some of these projects have included streetscaping with urban design features, decorative as well as regular lighting, utility coordination, maintenance of traffic plans and construction inspection services. These projects included: •NW 102nd Avenue from NW 138th Street to NW 142nd Street •NW 102nd Avenue from NW 142nd Street to NW 145th Place •E. 4th Avenue Improvements, LAP/ARRA Project •W. 29th Street Improvements, from West Okeechobee Road to West 4th Avenue LAP/ARRA Project •E. 6th Avenue to E. 8th Avenue, from Hialeah Drive to E. 5th Avenue •E. 1st Avenue, E. 47th Street, E. 48th Street Reconstruction •Palm Avenue from W. 45th Street to W. 47th Street •Palm Avenue from W. 47th Street to W. 49th Street •Palm Avenue from Okeechobee Road to E. 21st Street •E. 1st Street to E. 2nd Avenue between E. 10th & E. 15th Street •E. 1st Street to E. 2nd Avenue between E. 16th & E. 20th Street •East 1st Avenue from Okeechobee Road to E. 21st Street •W. 6th Avenue/W. 81st Street •W. 7th Avenue/W. 75th Street/W. 76th Street/W. 78th Street •W. 74th Street, from W. 8th Avenue to W. 12th Avenue •W. 77th Street, from W. 8th Avenue to W. 4th Avenue •W. 78th Street Reconstruction •W. 33rd Street, from W. 4th Avenue to W. 12th Avenue •W. 36th Street, W. 36th Terrace, W. 37th Street •W. 37th Street, from W. 18th Avenue to W. 16th Avenue •East 4th Avenue Street Assessment •SE 8th Court/9th Avenue Improvements •West 83rd Court Improvements •East 26th, East 27th Street, East 11th Avenue Streetscape Section F - Page | 1 CENTRAL BROWARD WATER CONTROL DISTRICT ENGINEER SERVICES BROWARD COUNTY, FLORIDA CLIENT: Central Broward Water Control District 8020 Stirling Road Hollywood, Florida 33023 Mr. Mike Crowley District Manager Tel: (954) 432-5110 Fax: (954) 432-8603 Email: districtmanager@centralbrowardwc d.org RJ BEHAR’S ROLE District Engineering Services PROJECT STARTED: 4/24/2007 PROJECT COMPLETED: Ongoing COST/FEES PAID: $425,948.07 (as 12/20/2019) CONSTRUCTION COST: Varies per project RJ BEHAR’S KEY PERSONNEL: Robert J. Behar, PE Principal in Charge Hans Murzi, PE, CPM District Drainage Engineer Juan H. Vazquez, PE, PH, BCEE Technical Support The Central Broward Water Control District is a local government agency chartered by the State of Florida to provide secondary water management and stormwater drainage in southwest Broward County. Within its 45 square mile area, this special drainage district incorporates almost 107 miles of canals that are located within 6 cities and towns, as well as unincorporated areas of Broward County. Under this contract, RJ Behar & Company, Inc. (RJ Behar) serves as one of two firms who serve as District Drainage Engineers (DDE). As DDE, RJ Behar reviews plats, applications for water management work permits, paving and drainage plans, as-built plans, and permit renewal applications for conformance with the District’s drainage regulations, standards, procedures, and design criteria. RJ Behar also provides other services including drainage criteria, manual updates, special studies, data collection and monitoring, computer modeling, geographic information systems, master planning, design, permitting, cost estimating, construction inspection services, facilities financing, facilities operations and other services as directed by the District. Permit reviews are conducted and verified against District criteria. RJ Behar also participates in the District Board Meetings as representative to the District. For this contract the deliverables mostly consist of comments to submitted permit packages. The responses are reviewed with senior engineers before submittal to the client. On complex reviews, peer review and consultation are also conducted to verify criteria and hydrologic-hydraulic analyses. All of the schedules, budgets, and deliverables are monitored using spreadsheets and scheduling software. Tasks are completed within the time and budgets allocated. Section F - Page | 2 STRUCTURAL PLANS REVIEW CONTRACT PALM BEACH COUNTY, FLORIDA Australian Ave. Bridge over Clear Lake Relief Canal CLIENT: Palm Beach County Department of Engineering & Public Works Division of Roadway Production Mr. David L. Young, PE 2300 North Jog Road West Palm Beach, Florida 33411 Tel: (561) 684-4150 Fax: (561) 684-4166 E-mail: dlyoung@pbcgov.org RJ BEHAR’S ROLE: Structural Design & Permit Reviews PROJECT STARTED: 12/07/2004 PROJECT COMPLETED: Ongoing COST/FEES PAID: $397,070.43 (Cost/Fees Paid as 1/22/2020) CONSTRUCTION COST: More than $22,500,000.00 RJ BEHAR’S KEY PERSONNEL: Robert J. Behar, PE Principal in Charge Jerry Piccolo PE Structural Engineer Jose Peña Ramos, PE Structural Engineer Jossmel Cruz Garcia, EI Structural Designer R.J. Behar & Company, Inc. (RJ Behar) was contracted by Palm Beach County to review all bridge plans produced for the County by other Consultants. The bridge plans, bridge design calculations and bid item quantities are reviewed in detail. The roadway plans are reviewed to ensure that they are consistent with the bridge plans. One site review is conducted with each review, which focuses on existing conditions such as utilities, correct bridge length and location and the condition of existing bridges to be widened. RJ Behar has provided all of the review services for this project to date. RJ Behar has designed bridges for Palm Beach County since 1989 and he is very familiar with their procedures and needs of the County. Lawrence Road Bridge over Boynton Canal Congress Avenue Bridge over L-14 Canal Section F - Page | 3 CITYWIDE PEDESTRIAN SAFETY PROJECT CITY OF DANIA BEACH CLIENT: City of Dania Beach Public Services Department 1201 Stirling Road Dania Beach, FL 33004 Mr. Colin Donnelly CIP & Grants Administrator Phone: 954-924-6808 x3618 Fax: 954-923-1109 E-mail: cdonnelly@daniabeachfl.gov RJ BEHAR’S ROLE: Construction Engineering Inspection (CEI) services PROJECT STARTED: 10/08/2019 PROJECT COMPLETED: 8/2020 COST/FEES PAID: $90,887.20 CONSTRUCTION COST: $459,199.40 TIME EXTENSIONS: COVID-19 Delay of two weeks CITY PROJECT ITB NO.: 19-004 FEDERAL AID PROJECT # D418- 112-B FM NO.: 438282-1-58-01 RJ BEHAR’S KEY PERSONNEL: Robert J. Behar, PE Principal in Charge Nestor Santana, PE Project Manager Michael Owensby Senior Inspector/P.A. Assistant Logan Fasanella Field Inspector Zugeil Velez Resident Compliance Specialist R.J. Behar & Company, Inc. (RJ Behar) is providing Construction Engineering Inspection (CEI) services for the Citywide Pedestrian Safety Project. This project is receiving FHWA Federal Funding via the Florida Department of Transportation (FDOT) LAP Program. The project is designated as an "Off the State Highway (Off-System) LAP Project". In addition to inspection and coordination, RJ Behar coordinated with and provided FDOT with all the required information to ensure compliance with all LAP requirements. As part of the CEI inspection duties, RJ Behar performed daily inspections, produced weekly reports, monitored the contractor’s pay items, held progress meetings, prepared the meeting agendas, processed payment applications, monitored shop drawings and RFIs, performed Temporary Traffic Control Plan Reviews including the coordination of lane closures, carried out the stormwater pollution prevention plan site reviews per NPDES requirements, conducted the material sample reviews and approvals (LIMS), reviewed the EEO Submittals, reviewed the Contractor & Subcontractor’s payrolls, uploaded project documents in FDOT Lap-It, and performed final closeout. Section F - Page | 4 CITY CENTER TRAFFIC IMPACT STUDY CITY OF PEMBROKE PINES, FLORIDA CLIENT: City of Pembroke Pines 601 City Center Way Pembroke Pines, Florida 33025 Mr. Karl Kennedy, PE City Engineer Phone (954) 518-9040 Fax (954) 518-8905 Email: kkennedy@ppines.com RJ BEHAR’S ROLE: RJ Behar performed field reviews, data collection, signal timing, LOS Analysis, Review of Traffic Impacts, and compiling a report. PROJECT STARTED: 04/04/2019 PROJECT COMPLETED: 3/2020 COST/FEES PAID: $57,873.75 CONSTRUCTION COST: Study RJ BEHAR’S KEY PERSONNEL: Robert J. Behar, PE Principal in Charge Rafael De Arazoza, PE Project Manager Michelle Leon, EI Traffic Engineer/Data Collection Hector Rosario, EI Data Collection Jaime Delgado Data Collection Xamarah Seda Velez Data Collection The City of Pembroke Pines wanted to determine the potential traffic impact as a result of the vehicular traffic generated by the proposed project, Charles F. Dodge City Center (City Center). This project will be constructed south of Pines Boulevard, between Hiatus Road and Palm Avenue. The project will be constructed in three phases, including two commercial areas, 365 units of apartments, 387 units of multifamily housing, a hotel and the development of the City Center. There is a 6.5- acre empty lot pending future development. According to the proposed plans, future customers/residents will be able to access the development through several roadways, including Washington Street (St.) and Hiatus Road (Rd.); Hiatus Rd. and Palm Avenue (Ave.); Pines Boulevard (Blvd.) with 103 Ave, 106 Ave. and 108 Ave.; City Center Blvd. and Palm Ave.; and SW 7 St. and Palm Ave. The objective of this traffic impact study was to determine the impact of the vehicular traffic generated from the proposed development project. The traffic analyses focused on determining the effects in a 2-year projection time period and assessed the existing and future conditions with and without the project’s generated vehicular traffic. The scope of work included traffic data collection, trip generation analysis, trip distribution, trip assignment, crash history and capacity/level-of-service (LOS) analyses. The analyses included eight intersections. Section F - Page | 5 NW 97TH PRELIMINARY JUSTIFICATION REPORT TOWN OF MEDLEY, FLORIDA CLIENT: Town of Medley Capital Projects & Economic Development 7777 NW 72nd Avenue Medley, Florida 33166 Mr. Jorge E. Corzo PE Town Engineer/Director Tel: (305) 887-9541 Ext.143 E-mail: jcorzo@townofmedley.com RJ BEHAR’S ROLE: Transportation Planning PROJECT STARTED: 7/2019 PROJECT COMPLETED: 7/2020 COST/FEES PAID: $56,887 CONSTRUCTION COST: $2,800,000 (Est) RJ BEHAR’S KEY PERSONNEL: Robert J. Behar, PE Principal in Charge Paola Riveros, PE Project Engineer Angel Marinez Designer Xamarah Seda Designer R.J. Behar & Company, Inc. (RJ Behar) was contracted by the Town of Medley to provide a planning report for NW 116th Street from NW 116th Way to South River Drive. The scope of work included analysis of existing conditions, field visits, evaluation of alternatives with costs and preparation of a report. The Planning and Conceptual Engineering (PACE) Study was prepared to identify the infrastructure needs within the project area as they relate to automobile, pedestrian, bicycle mobility, and drainage. Upon identifying the project area improvements proposed, the report served as a guide for development of construction documents for the proposed improvements to be used during the design and permitting phase of the project. The proposed roadway improvements and road reconstruction, along NW 106th Street, consisted of widening to attain three 12-foot-wide lanes (one of which will be a two-way turn lane) and Type F curb and gutter. Improvements included the addition of a 6-foot wide sidewalk along the north side of NW 106th Terrace and south side of NW 106th Street to provide pedestrian connectivity, as well as 4-foot wide green bicycle lane on both directions for the entire length of the project. Two alternatives (A and B) were developed for the project. Both alternatives included reverse curves connecting NW 106th Terrace and NW 106th Street, which will make the transition between corridors, geometrically smoother than the existing conditions. The Russian Colony Canal is proposed for relocation, on average, 40 feet north to accommodate the proposed roadway improvements. Furthermore, a new drainage system will be provided for the entire length of the project. Section F - Page | 6 OAKHILL CULVERT REPLACEMENT SW 17th STREET TOWN OF DAVIE, FLORIDA After CLIENT: Town of Davie 6591 Orange Drive Davie, Florida 33314 Osdel Larrea Public Works & Capital Projects Director Tel: (954) 797-2086 – Office (954) 797-1246 - Fax E-mail: olarrea@davie-fl.gov RJ BEHAR’S ROLE: Design, Permitting and Post Design Services PROJECT STARTED: 12/2018 PROJECT COMPLETED: 5/2019 COST/FEES PAID: $29,953 CONSTRUCTION COST: $90,000 (Estimate) RJ BEHAR’S KEY PERSONNEL: Juan H. Vazquez, PE, PH, BCEE Principal in Charge Hans Murzi, PE Project Manager Kira Leon, PE Project Engineer Hector Rosario, EI Project Engineer The project consisted of the coordination, design, permitting, and bidding assistance for the replacement of a culvert bridge in the Oakhill neighborhood. The project location at the intersection of 17th St. and SW 142nd Ave. in Section 30, Township 41 South Range 43 East, Davie, Florida. The project will replace an existing culvert at the Oak Hill neighborhood on a Central Broward Water Control District (CBWCD) canal. The Oak Hill culvert is an existing 66-inch corrugated metal pipe culvert approximately 36-feet long with sand cement end walls under SW 17th Street. The CBWCD performed an inspection of the culvert and determined that the pipe has completely deteriorated and had collapsed. CBWCD determined that the pipe needs to be replaced with a 60-inch reinforced concrete pipe. Permits included Broward County Environmental Resource License, Central Broward Water Control District, and US Army Corps of Engineers Nationwide Permit (NWP) Number 7. RJ Behar was responsible for complete plans preparation, specifications, preparation of permit sketches, permitting packages and follow up. Methodology & Approach: The approach included data collection, review of existing conditions, coordinating topographic survey and geotechnical exploration, and preparation of the plans including Temporary Traffic Control, erosion control and specifications. Quality Assurance/Quality Control: Quality control was completed by in-house personnel using RJ Behar’s quality control review procedures. Management Process: The schedule, budgets, and deliverables were monitored using spreadsheets and scheduling software. Results: The plans were completed with minor comments from the owner and all the permits were obtained including the USACE ahead of schedule. Before Section F - Page | 7 RIVERVIEW PUMP STATION NEW GENERATOR, FIRE SUPPRESANT AND MAIN SWITCH DISCONNECT CITY OF MIAMI, FLORIDA Exist. Generator CLIENT: City of Miami Department of Public Works - NPDES Section 444 S.W. 2nd Avenue, 8th Floor Miami, Florida 33130 Ms. Maria Gabriela David, E.I. Ph.: (305) 416-1244 Fax: (305) 416-1278 E-mail: mdavid@miamigov.com RJ BEHAR’S ROLE: Project Management, Electrical design, Cost estimates and Specifications PROJECT STARTED: 11/10/2017 PROJECT COMPLETED: 2019 COST/FEES PAID: $74,200 CONSTRUCTION COST: $935,000 (est.) PROJECT #: M-0127 RJ BEHAR’S KEY PERSONNEL: Juan. H. Vazquez, PE, PH, BCEE Principal in Charge Reynaldo Orozco, PE Electrical Engineer Richard Bolt Cost Estimates and Specs Kira Leon, EI Plans Preparation Jossmel Cruz Structural Designer R.J. Behar & Company, Inc. (RJ Behar) was contracted to provide engineering services for the replacement of the Riverview Pump Station Generator and pumps interconnection in the City of Miami. The Riverview Pump Station is located at 1301 NW 6th Street, approximately 500 ft. east of the Marlin’s Baseball Park. The pump station is part of the City's stormwater system that includes 12 stormwater pump stations, 1.36 million feet of pipes, over 14,400 catch basins and manholes and 257 outfall structures. In 2013, the City removed two axial pumps and respective motors and installed two new Fairbanks Morse 35,000 GMP Axial Flow Pumps and two 500 HP motors at the Riverview Pump Station. The work on this project included the removal of the existing generator and the installation of a new generator. The engineering analysis included the following: 1.Analysis of two possible scenarios for sizing the new generator. 2. Design and Plans Preparation 3.Project Specifications 4.Estimates of Probable Costs Services will also include Engineer of Record Post Design Support and Construction Management Assistance. The design also included the structural design of the new generator foundation. The project also includes design of a new Fire Suppressant System and Main Switch Disconnect for the Pump Station. This portion of the work is being done by a subconsultant. Section F - Page | 8 CANAL BANK RESTORATION PROJECT DESIGN CITY OF LAUDERDALE LAKES, FLORIDA CLIENT: City of Lauderdale Lakes Mr. Maqsood Mohammad Nasir, PE City Engineer / CIP Administrator 4300 NW 36th Street Lauderdale Lakes, Florida 33319 Tel: (954)535-2815 Fax: (954) 733-4220 Email:mmnasir@lauderdalelakes.org RJ BEHAR’S ROLE: Canal Bank Stabilization Design PROJECT STARTED: 10/11/2015 PROJECT COMPLETED: 07/11/2017 CHANGE ORDERS: None CONSULTANT FEES: $208,116.00 CONSTR. COST: $2,900,000 (Est.) RJ BEHAR’S KEY PERSONNEL: Juan H. Vazquez, PE, PH, BCEE Principal-In-Charge Paola Riveros, PE Project Manager/Engineer of Record Kira Leon, EI Project Engineer Michelle Leon, EI Project Engineer The City of Lauderdale Lakes owns and maintains approximately 11 miles of canals distributed throughout the City. Currently, the existing canals have a mix of different types of seawall systems and revetment systems in different stages of disrepair. The City has undertaken improvements in several areas. The purpose of this project is to repair and stabilize the canal banks based on the recommendations of the preliminary study and evaluation. The scope of the work includes the design of the improvements, preparing plans, typical sections, cross sections, special details, technical specifications and opinion of probable costs. R.J. Behar & Company, Inc. (RJ Behar) was also in charge of preparing the required permit applications with Broward County and the United States Army Corp of Engineers and following up to obtain the permits. Section F - Page | 9 I-595 MOBILITY HUB PARK AND RIDE BROWARD COUNTY, FLORIDA CLIENT: Florida Department of Transportation, District 4 Helen James, P.E. Project Manager Design Consultant Management Office 3400 West Commercial Blvd. Fort Lauderdale, FL 33309 Tel: (954) 777-4346 Email: Helen.james@dot.state.fl.us RJ BEHAR’S ROLE: Project management, parking lot design, drainage design, and signing and pavement markings PROJECT STARTED: 2/27/2017 PROJECT COMPLETED: 2/28/2018 COST/FEES PAID: $86,500.00 CONSTRUCTION COST: $865,000 FM NO.: 439776-1-52-01 RJ BEHAR’S KEY PERSONNEL Juan H. Vazquez, PE, PH, BCEE Principal in Charge Paola Riveros, PE Project Manager Kira Leon, EI Project Engineer Nanette Akyaz Project Designer The existing Mobility Hub/Park and Ride is located at the southeast corner of the intersection of SR 84 and Davie Road in the Town of Davie. The mobility hub was designed with a capacity of 108 parking spaces. The site provides platforms for the express buses (on SR 84), local shuttles and drop off/pick up vehicles. There is also a connection from SR 84 to Reese Road. The connection was meant to be used only by buses and consisted of one travel lane from SR 84 to Reese Road at the northeast corner of the property. The number of parking spaces has become inadequate and the connection from SR 84 to Reese Road is being used by all vehicles without control. The scope of work for this project included modifying the mobility hub to increase and maximize the number of parking slots, review the Reese Road connection to improve access control and improve circulation. These improvements required modifications to the existing drainage, lighting, signing and pavement markings and landscaping. R.J. Behar’s services included the preparation of a Community Awareness Plan, preparing Flyers and attending a public meeting. Coordination included the Town of Davie, Broward County Transit agency and the Department. The site design included preparing a master plan of the proposed improvements for review and approval by the FDOT. Once the master plan was approved, the design included geometric design, quantities, specifications, cost estimates, drainage design and drainage plans, signing and marking design and plans, lighting design and plans, utility coordination, and preparing the required permit modifications. Section F - Page | 10 Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section F – Page | 11 F. Executed Agreements Past 5 Years Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section F – Page | 12 TIERRA SOUTH FLORIDA, INC. CONTINUING CONTRACT REFERENCES Name of Contact: Mr. Robert Rose, AIA Title of Contact: Capital Projects Director Telephone Number: 954-602-3307 Email: Rhrose@Miramarfl.gov Project/Services: City of Miramar - Construction Testing and Inspection Services Status of Contract: On-Going since July 2009 Amount of Contract Award: $195,141.25 to date Key Personnel: Raj Krishnasamy, PE, Francois Thomas, PE Name of Contact: Mr. Alan Gazazzi, AIA Title of Contact: Capital Projects Director Telephone Number: 954-572-2487 Email: AGavazzi@Sunrisefl.gov Project/Services: City of Sunrise - Geotechnical and Engineering Testing Services Status of Contract: On-Going since April 2015 Amount of Contract Award: $266,437.50 to date Key Personnel: Raj Krishnasamy, PE, Francois Thomas, PE Name of Contact: Ms. Tanya McConnell, P.E. Title of Contact: Deputy County Engineer Telephone Number: 561-684-4019 Email: Tmcconell@Pbcgov.org Project/Services: Palm Beach County - Annual Testing Lab Status of Contract: On-Going since April 2008 Amount of Contract Award: $1,327,735.50 to date Key Personnel: Raj Krishnasamy, P.E, Francois Thomas, P.E. Name of Contact: Ms. Amanda Barnes Title of Contact: Assistant Director of Utilities Telephone Number: 561-741-2537 Email: Amandab@Jupiter.fl.us Project/Services: Town of Jupiter – Geotechnical Engineering and Material Testing Services Status of Contract: On-Going since April 2012 Amount of Contract Award: $78,946.50 to date Key Personnel: Raj Krishnasamy, PE, Francois Thomas, PE Name of Contact: Ms. Talia Garcia, P.E. Title of Contact: Utilities Engineering Manager Telephone Number: 561-338-7307 Email: TGarcia@Myboca.us Project/Services: City of Boca Raton – Geotechnical Engineering and Lab Testing Services Status of Contract: On-Going since October 2013 Amount of Contract Award: $239,572.50 to date Key Personnel: Raj Krishnasamy, PE, Francois Thomas, PE Section F - Page | 13 Name of Contact: Mr. Erik Ferguson Telephone Number: (561) 494-1120 Email: eferguson@wpb.org Project/Services: City of West Palm Beach: General Engineering Services – Geotechnical Analysis Status of Contract: On-Going since 2012 Amount of Contract Award: $87,475.75 to date Key Personnel: Raj Krishnasamy, PE, Francois. Thomas, PE Name of Contact: Mr. Guillermo R. Peña, R.A., LEED® AP Title of Contact: Construction Manager 2 Telephone Number: (305) 755-5456 Email: williep@miamidade.gov Project/Services: Miami-Dade County: Equitable Distribution Program for Geotechnical and Material Testing Services Status of Contract: On-Going since 2006 Amount of Contract Award: $555,679.56 to date Key Personnel: Raj Krishnasamy, PE, Francois Thomas, PE Name of Contact: Mr. Kirk Stetson Title of Contact: Manager of Facilities Planning and Construction Telephone Number: (561) 868-3481 Email: stetsonk@palmbeachstate.edu Project/Services: Palm Beach State College: Geotechnical Engineering Services Annual Contract Status of Contract: On-Going since 2008 Amount of Contract Award: $266,047.00 to date Key Personnel: Raj Krishnasamy, PE, Francois Thomas, PE Name of Contact: Mr. Ramana Kari, P.E., BCEE Title of Contact: Chief Engineer Telephone Number: 561-640-8923 Email: rkari@swa.org Project/Services: Solid Waste Authority: Misc. Geotechnical Engineering and Construction Materials Testing Services Status of Contract: On-Going since 2008 Amount of Contract Award: $344,308.34 to date Key Personnel: Raj Krishnasamy, PE, Francois Thomas, PE Name of Contact: Vijay Mishra, P.E. Title of Contact: Senior Project Manager Telephone Number: (561) 640-4000 Email: vmishra@sfwmd.gov Project/Services: South Florida Water Management District: Geotechnical Engineering and Testing Services Status of Contract: On-Going since 2012 Amount of Contract Award: $191,059.79 to date Key Personnel: Raj Krishnasamy, PE, Francois Thomas, PE Section F - Page | 14 JAVIER E. BIDOT ASSOCIATES, PSC CONTRACTS/REFERENCES a. Client Name, Address, Contact, Phone and Fax Numbers, e-mail address: Arcadis US Inc. Mr. Paul Walansky, PE 1500 Gateway Boulevard, Suite 200, Boynton Beach Florida, FL 33426; Phone: 561.697.7020; Email: Paul.walansky@arcadis.com b. Project Title: Topographic and Hydrographic Survey Support Services for SFWMD C-139 Flow Equalization Basin (FEB) c. Description of work performed; project location: Ground truthing topographic information for LiDAR verification, recovery and establishment of survey control on the project area and the existing conditions survey of various structures, proposed access and/or proposed embankments within the project limits, as supplemental data to support the project development and augment previous surveys performed by others. Project Location: Hendry County, Florida d. Year completed: 2020 e. Team Members: Javier E. Bidot Cruz, PSM; Carlos Lebrón Cabrera a. Client Name, Address, Contact, Phone and Fax Numbers, e-mail address: Song & Associates, Inc. Ms. Annmarie Mia Lonergan – Construction Administrator 1545 Centrepark Dr. North, West Palm Beach, Florida, 33401; Phone: 561.951.7853, Phone: 561-655-2423; Fax: 561-655-1482 Email: alonergan@songandassociates.com Jesus “Chu” Novoa – Project Manager Phone: 561-655-2423; E-mail: jnovoa@songandassociates.com b. Project Title: Broward County Schools Capital Improvements Program c. Description of work performed; project location: Scope of work consisted of existing conditions, topographic and utility location and identification (including GPR/SUE) surveys for capital improvement projects that included perimeter security, fire protection and site utilities. Project Location: Broward County, FL d. Year completed: 2020 e. Team Members: Javier E. Bidot Cruz, PSM; Carlos Lebrón Cabrera Section F - Page | 15 Arcadis U.S., Inc. 1500 Gateway Boulevard Suite 200 Boynton Beach Florida 33426 Tel 561 697 7000 Fax 561 369 4731 www.arcadis.com April 27, 2020 To Whom it May Concern: Arcadis, Inc. have since December 2018 retained the services of Javier E. Bidot & Associates, PSC for topographic and hydrographic survey work for the South Florida Water Management District. The survey work has been performed at the C-139 Flow Equalization Basin, L-3 Canal, L-2 Canal, and Deer Fence Canal. We have been very pleased with the responsiveness and quality of work from their team. Mr. Bidot’s team has completed work on schedule and they have kept us in the loop as project deliverables were being completed. We look forward to working with Javier E. Bidot & Associates, PSC on future projects. If you have any questions, feel free to contact me at 561-702-4370. Sincerely, Paul Walansky, P.E. Principal Water Engineer Contact: Paul Walansky Phone: 561-702-4370 Email: paul.walansky@arcadis.com Florida License Numbers Engineering 7917 Geology GB564 Surveying LB7062 Section F - Page | 16 CONTRACTS/REFERENCES a. Client Info: South Florida Water Management District; 3301 Gun Club Road, West Palm Beach, FL 33406; Tjerk van Veen, PE; Office: (561) 682-2717, Cell: (561) 252-6275; tvanveen@sfwmd.com b. Project Title: Structure Inspection Program (SIP) – Underwater Component c. Description: UESI was selected by the South Florida Water Management District (SFWMD) to perform underwater condition assessments of water control structures. The work orders to date have included the inspection of 23, 36 and 38 structures for FY17-18, FY18-19, and FY19-20, respectively, including culverts, spillways, pump stations, boat locks, and weirs. A UESI Florida professional engineer was always on site supervising the dive operation and providing an engineering assessment. The diving operation was surface supplied with full video and audio communication. As part of the deliverable UESI furnished raw videos, edited with title pages. The inspection data and photographs were entered into the District’s Archival Tool. A metadata file (in Excel form) was provided that listed the team members, dates, and a summary of the structure deficiencies and recommended repairs. d. Year Completed: W.O #5 completed 2020 e. Team Members: Jeffrey O’Connor, PE; Marty Faulk, CBI; Vince Trotta a. Client Info: St. Lucie Board of County Commissioners; 2300 Virginia Ave., Fort Pierce, FL 34982; Michael Harvey, EI; Office: (772) 462-1717, Cell: (772) 216-2586; harveym@stlucieco.org b. Project Title: St. Lucie County Culvert Inspections c. Description: Under task assignments under a general contract from 2016 through 2020, UESI provided underwater and wading inspections of culverts for St. Lucie County. Prior to the execution of this contract UESI had been performing the work under individual purchase orders. The culverts ranged in size from 30 to 84 inches and were made of concrete or corrugated metal. UESI developed a report format with the County’s input, that covers the following structural elements: roadway, shoulders, safety features (guardrails, etc.), channel, channel embankment, headwall, wingwall, pipe material, pipe shape, pipe joints, sediment aggregation or erosion (scour). UESI provided raw, unedited video (with audio) as well as a condition report for each structure. d. Year completed: 2020 e. Team Members: Jeffrey O’Connor, PE; Marty Faulk, CBI; a. Client Info: Peace River Manasota Regional Water Supply Authority; 8998 SW County Road 769, Arcadia, FL 34269; Sam Stone; Office: (863) 491-7567, Cell: (941) 626-3463; sstone@regionalwater.org b. Project Title: Peace River Reservoir Works Inspections c. Description: UESI performed three concurrent task assignments for the Authority. The assignments consisted of diving inspections of the Reservoir No. 2 Influent Works and the Reservoir No. 2 Effluent Works. Reservoir No. 2 Effluent Works was comprised of the Outlet Tower, one 54-inch discharge pipe, one 36-inch discharge pipe, one 66-inch discharge pipe and a baffle chute. An underwater inspection was performed on each of the facilities. The Outlet Section F - Page | 17 Tower had two vertical sluice gates, one variable crest gate and trash racks. The piping was inspected with a five-person dive team for the 300-ft-long penetration inspections. Reservoir No. 2 Influent Works was comprised of one 72-inch-diameter influent pipe and a concrete discharge structure with three trash racks. The piping was inspected with a five-person dive team for the 400-ft-long penetration inspections. Prior to the inspections, UESI installed a door on the trash rack of the discharge structure. A detailed report was provided that included findings, photographs, and recommendations for repair. Note: The identical inspections were completed as a subconsultant in 2019. d. Year completed: 2015 e. Team Members: Jeffrey O’Connor, PE; Marty Faulk, CBI; Section F - Page | 18 Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section G Section G. Corporate Standing and Authorized Signatory Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section G – Page | 1 G. Financial Stability RJ Behar has a sound financial base, has demonstrated financial stability, and possesses adequate physical resources to support our mission and the scope of our services we provide. The financial base and stability of the company and our ability to provide adequate physical resources is reflected in RJ Behar’s financial statements. Our “current ratio is approx- imately 1.17 and it has been on the rise of late, which should be over 2.0 if the current trend remains. Our growth is 0% over the past 3 years. Over the past year it is about 5% growth over last year’s revenue at this time. RJ Behar’s revenue is generated from providing professional consulting services to the State of Florida, Municipalities, Counties, Cities, as well as private clients. These funding sources are adequate to provide financial stability for our company. The stability of RJ Behar depends greatly on the CEO’s ability to keep accurate records of past and current financial conditions. RJ Behar is a financially stable company with an impeccable track record since 1999. RJ Behar has never been involved in any prior or current bankruptcy proceedings. Continuing Professional Consulting Services (CCNA) Request for Qualifications No. 20-07-01 Section H Section H. Forms and Attachments 6861 SW 196th Avenue, Suite 302 Pembroke Pines, Florida 33332 Tel: (954) 680-7771 / Fax: (954) 680-7781 Contact: Ms. Paola Riveros, PE priveros@rjbehar.com