HomeMy WebLinkAboutReso 2020-3083RESOLUTION NO. 2020 -,.a
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF SUNNY
ISLES BEACH, FLORIDA, APPROVING A FIFTH AMENDMENT TO
THE AGREEMENT WITH PERKINS+WILL ARCHITECTS, INC. FOR
ARCHITECTURAL DESIGN SERVICES FOR THE PEDESTRIAN
OVERPASS BRIDGE AT 18080 COLLINS AVENUE, IN AN AMOUNT
NOT TO EXCEED NINETY-NINE THOUSAND NINE HUNDRED
DOLLARS ($99,900.00), ATTACHED HERETO AS EXHIBIT "A";
AUTHORIZING THE MAYOR TO EXECUTE SAID AMENDMENT;
AUTHORIZING THE CITY MANAGER TO DO ALL THINGS
NECESSARY TO EFFECTUATE THIS RESOLUTION; PROVIDING FOR
AN EFFECTIVE DATE.
WHEREAS, on April 30, 3015 the City issued Request for Qualifications No. 15-04-01
for Architectural Design Services for a New Facility at 18080 Collins Avenue, of which eight (8)
responses were received; and
WHEREAS, on September 17, 2017 via Resolution No. 2015-2459 the City Commission
ratified an agreement with Perkins+Will Architects, Inc. to provide Architectural Design Services
for the Government Annex Building at 18080 Collins Avenue ("Agreement"), in an amount not to
exceed $2,222,000.00; and
WHEREAS, on December 17, 2015 via Resolution No. 2015-2504, the City Commission
approved a First Amendment to the Agreement to include interior design and consultant design
fees for the 250 -seat Community Theater integrated within the design of the Government Annex
Building, in an amount not to exceed $229,300.00; and
WHEREAS, on April 19, 2018 via Resolution No. 2018-2812, the City Commission
approved a Second Amendment to the Agreement to include the design of a pedestrian overpass
bridge integrated within the design of the Government Annex Building, in an amount not to exceed
$370,000.00; and
WHEREAS, on October 17th, 2019 via Resolution No. 2019-3002, the City Commission
approved a Third Amendment to the Agreement to include coordination with the Florida
Department of Transportation ("FDOT") and other regulatory agencies having jurisdiction over
Collins Avenue relating to the pedestrian overpass bridge, in an amount not to exceed $50,000.00;
and
WHEREAS, on February 20, 2020 via Resolution No. 2020-3044, the City Commission
approved a Fourth Amendment to the Agreement to include coordination with FDOT civil
engineering and architecture, cost estimate and formatting relating to schematic designs, and wind
modeling, in an amount not to exceed $183,850.00, bringing the total contract amount not to
exceed $3,055,150.00; and
WHEREAS, the City Commission now wishes to approve a Fifth Amendment to the
Agreement with Perkins+Will Architects, Inc. to provide structural analysis and supporting
documentation for Construction Sequence Engineering, as requested by FDOT, provide the precast
concrete attachment details as part of the construction documents, engage GFRC manufacture,
Building Blocks, for design assist to develop the basis of design for the precast panel attachment
details and performance specifications, and to provide design assist to further define the GFRC
82020 5th Amend to Perkins and Will for Gov Or Annex Page I oil
design to optimize fabrication, constructability and cost efficiencies, as requested by FDOT, in an
amount not to exceed Ninety -Nine Thousand Nine Hundred Dollars ($99,900.00), bringing the
total contract amount not to exceed Three Million One Hundred Fifty -Five Thousand Fifty Dollars
($3,155,050.00), attached hereto as Exhibit "A".
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF SUNNY ISLES BEACH, FLORIDA, AS FOLLOWS:
Section 1. Approval of Fifth Amendment. The City Commission hereby approves a Fifth
Amendment to the Agreement with Perkins+Will Architects, Inc. for additional services, as more
particularly described in Exhibit "A", which were not included as part of the original Agreement,
in an amount not to exceed Ninety -Nine Thousand Nine Hundred Dollars ($99,900.00), bringing
the total contract amount not to exceed Three Million One Hundred Fifty -Five Thousand Fifty
Dollars ($3,155,050.00).
Section 2. Authorization of Maw The Mayor is hereby authorized to execute said
Amendment.
Section 3. Authorization of City Manama The City Manager is hereby authorized to do all
things necessary to effectuate this Resolution.
Section. 4. Effective Date. This resolution shall become effective upon adoption.
PASSED AND ADOPTED this 16"' day 9fJLlly 2020.
H. Scholl, Mayor
ATTEST:
r " Mauricio Beta CLI , CMC, City Clerk
APPROVED AS TO FORM AND
LE S FFICIENCY
Edward A Dion, City Attorney
V „
Moved by j' 9 l.``A /�?/Vw C M,..econded by:' 1�(ti`.`°< _ f.
Vote:
Mayor Scholl
(Yes)
_(No)
Vice Mayor Svechin
_(Yes)
___(No)
Commissioner Goldman
�° (Yes)
______(No)
Commissioner Lamm
'' /(Yes)
(No)
Commissioner Viscarra
_(Yes)
__(No)
82020 5th Amend to Perkins and Will for Gov Ctr Annex Page 2 of 2
FIFTH AMENDMENT TO THE AGREEMENT BETWEEN
THE CITY OF SUNNY ISLES BEACH AND
PERKINS & WILL ARCHITECTS INC.
CONTRACT NO. C1415-087
This Fifth Amendment to the Agreement between the CITY OF SUNNY ISLES BEACH
("C' y") and E INS & WILL ARCHITECTS, INC. ("Architect"), executed this day
of 4, 2020 is made a part of the original Agreement between the parties dated
August 21, 2015, as amended, Contract No. 01415-087 (the "Agreement"), and the City and the
Architect hereby agree to amend the Agreement as follows:
1. ADDITIONAL SERVICES. Pursuant to Section 1.3 of the Agreement, the City
hereby wishes to amend Article 3 of the Agreement ("Architect's Basic Services") to include the
services of Thornton Tomassetti, to provide structural analysis and supporting documentation for
Construction Sequence Engineering, as requested by the Florida Department of Transportation
("FDOT"); to provide the precast concrete attachment details as part of the construction
documents; to engage GFRC manufacture, Building Blocks, for design assist to develop the basis
of design for the precast panel attachment details and performance specifications; and to provide
design assist to further define the GFRC design to optimize fabrication, constructability and cost
efficiencies, as requested by FDOT; all as more particularly described in composite Exhibit "A",
which is attached hereto and incorporated herein by reference.
2. ADDITIONAL COMPENSATION. Article 2 of the Agreement is hereby
amended to include additional compensation for the Additional Services in an amount. not to
exceed Ninety -Nine Thousand Nine Hundred Dollars ($99,900.00), bringing the total contract
amount not to exceed Three Million One Hundred Fifty -Five Thousand Fifty Dollars
($3,155,050.00).
3. OTHER PROVISIONS REMAIN IN EFFECT. Except as specifically
modified herein, all terms and conditions of the Agreement, as amended, shall remain in fill) force
and effect.
4. CONFLICTING PROVISIONS. The terms, requirements, and provisions
contained in this Fifth Amendment shall prevail and be given superior effect and priority over any
conflicting or inconsistent term, statement, requirement, or provision contained in any other
document or attachment, including but not limited to the Agreement.
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK]
IN WITNESS WHEREOF, the parties have executed this Fifill Amendment to the
Agreement as of the date referenced above. 0%
WITNESS:
Signature
Print In
AT
Maori &o-Yc:
WMIX
m
LL ARCHITECTS, INC.
gmw%ol PAOK
*UV%4060 WNW%
CITY ZOFU NY ISLES REACH
By:
)ur, City Clerk urge H. Scholl, Mayor
PA
APPROVED AS TO FORM AND
LEGAL SUFFICIENCY
Edward A. Dion, City Attorney
Perkins&Will
Additional Service Request
Request # ASR -07
Project Name:
Sunny Isles Beach Pedestrian Bridge
Date Prepared:
Thursday, January 16, 2020
Project Number:
810504.001
Client:
City of Sunny Isles Beach
18070 Collins Avenue
4th Floor
Sunny Isles Beach, FL 33160
Prepared By: Jose Bofill
Attention: Richard Labinsky
Contract Summary
This Additional Service complies with all terms and conditions found in the Prime Agreement entered into between
Perkins+Will and City of Sunny Isles Beach Dated: 4/16/2018
Description of Work
In response to FDOT request, Thornton Tomasetti will provide structural analysis and supporting documentation for FDOT review
comments, AASHTO requirements and Construction Sequence Engineering per attached proposal.
Details
Fee
Subtotals
Structural Engineering
Thornton Tomasetti
$ 59,800.00
$ 59,800.00
Principal 20 hrs x $335 = $6,700
Associate 120hrs x $255 = $30,600
Sr. Proj. Engineer 60hrs x $235 = $14,100
$ -
$ -
Sr. BIM 48hrs x $175 = $8,400
$
$ -
Comments
Original Contract Fee:
$ 370,000.00
Fee for Additional Service:
$ 59,800.00
Consultant's Signature
Date: June 09,2020
Owner's Signature
Date:
Perkins&Will
Additional Service Request
Request # ASR -08
Project Name:
Sunny Isles Beach Pedestrian Bridge
Date Prepared:
Thursday, January 16, 2020
Project Number:
810504.001
Client:
City of Sunny Isles Beach
18070 Collins Avenue
4th Floor
Sunny Isles Beach, FL 33160
Prepared By: Jose Bofill
Attention: Richard Labinsky
Contract Summary
This Additional Service complies with all terms and conditions found in the Prime Agreement entered into between
Perkins+Will and City of Sunny Isles Beach Dated: 4/16/2018
Description of Work
In response to FDOT request to provide the precast concrete attachment details as part of the construction documents, the design team
will engage GFRC manufacture, Building Blocks, for design assist to develop the basis of design for the precast panel attachment details
and performance specifications. In addition, the design assist will further define the GFRC design to optimize fabrication, constructability
and cost efficiencies.
Details
Design Assist Building Blocs, Inc.
Design Director - 48 hours X $250/hour = $12,000
Detailer - 48 hours X $125/hour = $6,000
Engineer - 48 hours X $200/hour = $9,600
Design Integration and
FDOT coordination Perkins+Will
Managing Principal - 4 hours X $272/hour = $1,088
Project Manager - 8 hours X $224/hour = $1,792
Project Architect - 48 hours X $200/hour = $9,620
Comments
Consultant's Signature
Owner's Signature
Original Contract Fee:
Fee Subtotals
$ 27,600.00 $ 27,600.00
$ 12,500.00 $ 12,500.00
$ 370,000.00
'Fee,forAdditional Service: $ 40,100:00.
Date: June 09,2020
Date: