HomeMy WebLinkAboutReso 2020-3126RESOLUTION NO.2020- �>12-So A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, APPROVING CHANGE ORDER NO. 29 RELATING TO THE AGREEMENT WITH ROHL GLOBAL NETWORKS, LP FOR THE COLLINS AVENUE UTILITIES UNDERGROUNDING PROJECT, IN AN AMOUNT NOT TO EXCEED EIGHT HUNDRED EIGHTY-NINE THOUSAND SIX HUNDRED THIRTY-THREE DOLLARS AND FORTY-ONE CENTS ($889,633.41) ATTACHED HERETO AS EXHIBIT "A"; AUTHORIZING THE CITY MANAGER TO SIGN SAID CHANGE ORDER AND TO DO ALL THINGS NECESSARY TO EFFECTUATE THIS RESOLUTION; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, on February 18th, 2016 via Resolution No. 2016-2525, the City Commission approved an agreement with Rohl Global Networks, LP ("Contractor"), for the Construction of the Collins Avenue Utility Undergrounding, in an amount of $4,830,000.00, and an owner contingency in the amount of $500,000.00, and an additional contingency in the amount of $1,500,000.00 for additional scope of work for Atlantic Boulevard, for a total amount not to exceed $6,830,000.00; and; WHEREAS, on February 16th, 2017 via Resolution No. 2017-2667, the Contractor submitted Change Order Nos. 1 through 6, which added: • 11,297 lineal feet of conduits as directed by the City; • Additional concrete removal and conduit placement in Town Center Park; • Completed miscellaneous below grade improvements on Collins Avenue and 195th Street; • Completed miscellaneous below grade improvements along the Atlantic Corridor; • Completed Collins Avenue due to the added .scope of work and unforeseen conditions; and • Purchased material for the Collins Avenue Street Light Project; and Change Order Nos. 1 through 6 were in an amount not to exceed $4,967,989.00, bringing the total contract amount not to exceed $11,797,989.00; and WHEREAS, on October 19, 2017 via Resolution No. 2017-2751, the City Commission ratified Change Order Nos. 7 through 9 and approved Changer Order Nos. 10-14, which: • Credited the City for direct material purchases in an amount of $528,677.28; • Credited the City for direct material purchases in an amount of $101,116.22; • Added 365 days to the length of the original contract thereby extending the completion date to March 31, 2018; • Repaired numerous pavement patches along Collins Avenue; • Repaved an additional 9,394 square feet along Collins Avenue; • Repaired and replaced the sidewalk on Atlantic Boulevard from 178th Street to 183`d Street; and WHEREAS, on February 15th, 2018 via Resolution No. 2018-2788, the City Commission ratified Change Order No. 15 and approved Change Order Nos. 17 and 18 with Rohl Global Networks, LP for credits to the City for direct material purchases, extension for R2020 CO 29 w ROHL Networks Page 1 of 4 project completion, recognizing a company name change, and decreasing the contract value in the amount of $79,500.00, bringing the total contract amount not to exceed $13,581,192.50; and WHEREAS, on February 15th, 2018 via Resolution No. 2018-2789, the City Commission ratified Change Order No. 16 and approved Change Order Nos. 16A and 16B with Rohl Global Networks, LP for credits to the City for direct material purchases and the rescinding of Change Order No. 16, decreasing the contract value in the amount of $666,250.00, bringing the total contract amount not to exceed $12,914,942.95; and WHEREAS, on May 17th, 2018 via Resolution No. 2018-2816, the City Commission approved Change Order No. 19 for the addition and relocation of Florida Power & Light and Atlantic Broadband services equipment, revised Atlantic corridor scope of work, and other unforeseen conditions on Collins Avenue in the amount of $899,524.00; and WHEREAS, on September 20th, 2018 via Resolution No. 2018-2869, the City Commission approved Change Order No. 20 crediting the City for direct material purchases in an amount of $37,100.00, bringing the total contract amount not to exceed $13,777,366.95, and Change Order No. 21 in an amount not to exceed $34,796.00 for work and material completed to assure that the State of Florida RRR project did not adversely impact the work previously completed, bringing the total contract amount not to exceed $13,812,162.95; and WHEREAS, on October 18th, 2018 via Resolution No. 2018-2879, the City Commission approved Change Order No. 22 to facilitate the ongoing installation of the Collins Avenue decorative streetlight project, alternate base installation to avoid utility conflicts, removal of abandoned bases as required by FDOT, provision of FPL power service points, and to establish a contingency allowance to resolve unforeseen and undocumented existing conditions in an amount not to exceed $400,000.00, bringing the total contract amount not to exceed Fourteen $14,212,162.95; and WHEREAS, on February 21", 2019 via Resolution No. 2019-2918, the City Commission approved Change Order No. 23 to continue the Collins Avenue decorative street lighting project and to replace the pedestrian crosswalk at 193rd Street in conjunction with Utility Undergrounding Project, in an amount not to $1,399,089.50, bringing the total contract amount not to exceed $15,611,252.45; and WHEREAS, on October 17, 2019 via Resolution No. 2019-3004, the City Commission approved Change Order No. 24 for credits to the City for direct material purchases, decreasing the contract value in the amount of $31,458.00, bringing the total contract amount not to exceed $15,579,794.45; and approved Change Order No. 25 to resolve unforeseen and undocumented existing conditions with the installation of the decorative street lighting and conduits along Collins Avenue, additional survey and as -built documents required by FPL for the undergrounding along the Atlantic Corridor, and increase in costs due to delays related to unforeseen conditions, in an amount not to exceed $982,615.00, bringing the total contract amount not to exceed $16,562,409.45; and WHEREAS, on January 16th, 2020 via Resolution No. 2020-3037, the City Commission approved Change Order Nos. 26 and 27 crediting the City for direct material purchases and reducing the amount of the contract by $211,553.00, bringing the total contract amount not to exceed $16,350,856.45; and R2020 CO 29 w ROHL Networks Page 2 of 4 WHEREAS, on February 20, 2020 via Resolution No. 2020-3055, the City Commission approved Change Order No. 28 for unforeseen obstructions, alternate spread footings, addition of power supply for low voltage outlets on streetlights, additional conduit and wire for revised streetlight locations, and additional material testing requirements mandated by FDOT, in an amount not to exceed $2,213,489.96, bringing the total contract amount not to exceed $18,564,346.41; and WHEREAS, the Contractor has submitted Change Order No. 29 for additional scope to the streetlight project, including additional fixtures, modified spread footings, increased conduit installation, extended general conditions, miscellaneous FDOT requirements, and unforeseen underground conditions, in an amount not to exceed $889,633.41, attached hereto as Exhibit "A"; and WHEREAS, Change Order No. 29 also adds 92 days to the length of the original contract, thereby extending the completion date to December 31, 2020; and WHEREAS, the City Commission wishes to approve Change Order No. 29 to the Agreement with ROHL Global Networks, LP in an amount not to exceed Eight Hundred Eighty - Nine Thousand Six Hundred Thirty -Three Dollars and Forty -One Cents ($889,633.41), for a new total contract amount not to exceed Nineteen Million Four Hundred Fifty -Three Thousand Nine Hundred Seventy -Nine Dollars and Eighty -Two Cents ($19,453,979.82), attached hereto as Exhibit "A". NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, AS FOLLOWS: Section 1. Approval of Change Order No. 29. The City Commission hereby approves Change Order No. 29 to the Agreement with ROHL Global Networks, LP in an amount not to exceed Eight Hundred Eighty -Nine Thousand Six Hundred Thirty -Three Dollars and Forty -One Cents ($889,633.41), for a new total contract amount not to exceed Nineteen Million Four Hundred Fifty -Three Thousand Nine Hundred Seventy -Nine Dollars and Eighty -Two Cents ($19,453,979.82), attached hereto as Exhibit "A". Section 2. Authorization of City Manager. The City Manager is hereby authorized to sign said Change Order and to do all things necessary to effectuate this Resolution. Section 3. Effective Date. This Resolution shall become effective upon adoption. PASSED AND ADOPTED this 15t" day oPOsltober 2020. H. Scholl, Mayor CMC, City Clerk R2020 CO 29 w ROHL Networks Page 3 of 4 APPROVED AS TO FORM AND LEGAL SUF Ll,-fidward A. Dion, City Attorney Moved by: CWM I S5(W D- P 6 NZ (VlW Seconded by: Vote: Mayor Scholl J (Yes) -7 (No) Vice Mayor Svechin (Yes) (No) Commissioner Goldman 47— (Yes) (No) Commissioner Lama (Yes) (No) Commissioner Viscarra (Yes) (No) R2020 CO 29 w ROHL Networks Page 4 of 4 SyNNY fp City of Sunny Isles Beach AO4 18070 Collins Avenue *- Sunny Isles Beach, Florida 33160 Ays (306) Hall oA9y FLO���Q'+4 It Of 504 h 305) 949 3113 Fax MEMORANDUM TO: The Honorable Mayor and City Commission FROM: Christopher J. Russo, City Manager DATE: 10/15/2020 Approving Change Order No.29 to the Agreement with RE: Global Networks, LP for the Utility Undergrounding Project. RECOMMENDATION: This Resolution is presented for your consideration REASONS: Change Order 29 increases the overall contract amount by $891,633.41 due to multiple issues encountered in the execution of the decorative street lighting phase of the project: 1. Unforeseen conditions relating to hidden and uncharted utilities buried under the sidewalk along Collins have required modified spread footings, previous footing designs prepared by the engineer of record required further design alterations. 2. FDOT traffic engineers required additional police detail presence during the execution of the modified spread footings noted previously, along with the reimbursement rate for officers being increased. 3. The original project limits as determined by FDOT did not encompass the entire length of Collins through out the City, nineteen additional fixtures and associated elements are being added to complete the project. 4. Additional light fixtures for future maintenance and replacement are being included. 5. The above noted impacts require a contract time extension and related additional costs for General Conditions, Maintenance of Traffic, and other associated costs. The new contract completion date id extended to December 31,2020. FUNDING SOURCE: Funds have been appropriated in account no. 300-5-5390-465000- 80004. ATTACHMENTS: Description Resolution Change Order No. 29 Item Number: 10.H. O� SJNNY 11P� r. n t F LO�\OP C,rY OF SUN PNo CITY of I CONTRACT SUNNY ISLES BEACH Change Order CHANGE ORDER NUMBER: 29 RFP NUMBER: 15-12-02 RESOLUTION NUMBER: TBD DATE: September 22, 2020 PROJECT: Collins Avenue Utility Undergrounding ORIGINAL DOLLAR CONTRACT AMOUNT: $ 6,830,000.00 NET TOTAL DOLLAR VALUE OF ALL PREVIOUS CHANGE ORDERS: $11 734 345.96 CONTRACT AMOUNT PRIOR TO THIS CHANGE ORDER: $18 564 345.96 DOLLAR AMOUNT THIS CHANGE ORDER: 889 633.41 NEW DOLLAR CONTRACT AMOUNT: 1 $19 453 979.37 ORIGINAL CONTRACT COMPLETION DATE March 31 2017 TOTAL OF PREVIOUS CHANGE ORDER DAYS: 1006 AMOUNT OF DAYS PER THIS CHANGE ORDER: 92 NEW CONTRACT COMPLETION DATE: December 31, 2020 DESCRIPTION OF SCOPE OR WORK CHANGES: The Contract is changed as follows: Due to additional scope of streetlight project, including additional fixtures, modified spread footings, increased conduit installation, extended general conditions, miscellaneous FDOT requirements, and unforeseen underground conditions. NOTE: Unless specifically stated clearly elsewhere on this page, this contract amendment does NOT include an extension of time or grant any additional general conditions amounts. The City and the Contractor agree that the contract time adjustment and sum agreed to in this document constitute a full and complete settlement of the matters set forth herein, including all direct and indirect costs for equipment, manpower, materials, overhead, profit and delav relating to the issues set fnrth in this dnrumPnt_ ROHL Networks (,�s CONTRACTOR Edward Dion CITY ATTORNEY: Paul T. Abbott Pad T Axon PROJECT MANAGER: Chris Russo .. CITY MANAGER: �"- - ; , PROJECT: Collins Avenue Utility Undergrounding City of Sunny Isles Beach 18070 Collins Ave. Sunny Isles Beach, FL 33160 TO CONTRACTOR: Rohl Global Networks LP 2875 Jupiter Park Dr. STE 900 Jupiter, FL 33458 Change Order Number: 29 Date: September 22, 2020 Architect's Project Number: 15-12-02 Contract Date: February 18, 2016 Contract For: Collins Avenue Utility Undergrounding The Contract is changed as follows: Change Order for additional items as described below: Extend General Conditions/MOT 1 — Month @ $22,750.00 = 22,750.00, 1 — Month @ $35,000.00 = $35,000.00 and 2 — Months @ $57,750.00 = $115,500.00 $173,250.00 Modify FPL Easement and Equipment layout at Sahara Condo — ALLOWANCE $35,000.00 Refurbish streetlights removed from Northwest end of Collins -7 X $3,000. $21,000.00 Density Testing at spread footer locations per FDOT requirements — ALLOWANCE $45,000.00 Additional fixtures for extended project limits - 14 luminaires @ $3,158.00 14 X $3,158.00 = $44,212.00, 10 poles @ $8,040.00 10 X $8,040.00 = $80,400. $124,612.00 Additional Spread footing for extended project limits 3 X 11,500.00 = $34,500.00 9 X $14,000.00 = $126,000 $160,500.00 Additional conduit and wire for extended project limits and traffic signals $85,000.00 Additional 120Volt transformers for extended project limits 18 x $1492.54 $26,865.72 Three additional complete streetlight assemblies for reserve 3 X $11,198.00 $33,594.00 Police Detail rate increase, additional details required by FDOT $44,472.00 Upgraded spread footings per FDOT requirements 11 X $2,500.00 $27,500.00 Additional Unforeseen obstructions — ALLOWANCE $80,000.00 5% Contingency on non allowance items $34,839.69 TOTAL CHANGE ORDER $891,633.41 Increase PO issued by the City of Sunny Isles Beach to RGN contract as follows: The original contract sum was: $6,8309000.00 The net change by previously authorized Change Orders: 11,734,345.96 The Contract Sum prior to this Change Order was: $18,564,345.96 The Contract Sum will be increased by this Change Order in the amount of $891,633.41 The new Contract Sum, including this Change Order, will be: $19,455,979.37 The Contract Time will be increased by: 92 Days Therefore, the date of Substantial Completion as of the date of this Change Order is: December 31, 2020 NOT VALID UNTIL SIGNED BY THE ENGINEER, CONTRACTOR AND OWNER. ENGINEER CONTRACTOR OWNER Chad Szklaruk PT Abbott SIGNATURE SIGNATURE SIGNATURE PRINTED NAME Chad Szklaruk Paul T Abbott PRINTED NAME PRINTED NAME DATE Sept. 22,2020 Sept. 22 2020 DATE DATE