Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
GOLDEN SHORES STREET LIGHTING BID NO 20-09-01
City of Sunny Isles Beach Sunny Isles Beach Government Center City Clerk. 18070 Collins Ave, 4th Floor Sunny Isles Beach, Florida 33160 Project Name Golden Shores Street Lighting Invitation to Bid No. 20-09-01 • r 2415 West 80 St Unit 7, Hialeah, FL 33016 Phone: 305-456-4848 Fax: 786-558-7422 Email: ho@auminc.us 1- Name of Company: AUIVI Construction, Inc 2- Company Locations: Miami Dade, Broward and Palm Beach 3- Internet Web Site Address: www.aumconstructioninc.com 4- Address: 2415 West 80 St Unit 7, Hialeah. FL 33016 5- Telephone No: 305-456-4848 6- Email Address: hoC�auminc.us 7- Proof of Insurance: Attached 8- Sunbiz Report: Attached 9- W9: Attached A� ® CERTIFICATE OF LIABILITY INSURANCE DATE/05/20/YYYY) 11/05/2020 THIS CERTIFICATE IS ISSUED ASA MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER, IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(les) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Sandra LaRue NAME: Frank H. Furman, Inc. ql� n Ear: (954) 943-5050 Flc, No: (954) 942-6310 1314 East Atlanfic Blvd. E-MAIL sandra@furmaninsurance.com ADDRESS: P. O. BOX 1927 INSURERS) AFFORDING COVERAGE NAIL N Pompano Beach FL 33061 INSURERA: Admiral Insurance Cc 111) 24856 INSURED slraFe n, Crum & Forster Indemnity CD (us) 31348 AUM Construction Inc 8950 NW 119th St I INSURER c : National Union Fire Ins Co of Pittsburgh PA 19445 INCrmFR n. Businessfirsl Insurance Cc 11697 I Hialeah Gardens FL 33018 I INSURER FI I COVERAGES CERTIFICATE NUMBER: B: 20 WC/AU & 19 GL/UM REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTR TYPE OF INSURANCE INSD MO POLICYNUMBER POLICY EFF MMIDMYYYY) POLICY EXP MMIDDIYYYY LIMITS logo are X COMMERCIAL GENERAL LIABILITY of ACORD EACH OCCURRENCE 10000,000 CIAIMG-MADE ® OCCUR DAMA ET RENTED PREMISES ERENTE occurrence)S 150,000 MED EXP (Any one person) § 1,000 PERSONAL &ADV INJURY § 1,000,000 A Y Y CA00003679201 12/01/2019 12/01/2020 GEN'LAGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE 5 2,000,000 - POLICY FX—] PRO- ❑ JECT LOC IO PRODUCTS - COMPPAGG 5 2,000,000 S OTHER. AUTOMOBILE LIABILITY COMaBINdEEDI SINGLE LIMIT S 1,000,000 X BODILY INJURY (Per person) $ ANYAUTO B OWNED SCHEDULED AUTOS ONLY AUTOS Y Y 1337479902 07/03/2020 07/03/2021 BODILY INJURY (Per accident) $ X PROPERTY DAMAGE Per accident § HIRED NON -OWNED X AUTOSONLY AUTOSONLV PIP -Basic s 10,000 X UMBRELLALIAB X1 OCCUR EACH OCCURRENCE s 5,000,000 AGGREGATE $ 5000,000 C EXCESS UAB CLAIMSMADE Y BE020770240 12/01/2019 12/01/2020 DED I I RETENTION S $ D WORKERS COMPENSATION ANDEMPLOYERS'LIABILITY VIN RIEXECUTIVE ANY PROPRIMBER/ EXCLUDED? OFFICER/MEMBER EXCLVOED? (Mandatory NH) NIA Y 052171590 06/18/2020 06/18/2021 X1 PER STATUTE OTH- ER E. L. EACH ACCIDENT 5 1,000,000 E.L. DISEASE EA EMPLOYEE $ 1,000,000 mister Dyes, describe under DESCRIPTION OF OPERATIONS below E.L. DISEASE -POLICY LIMIT 3 1,000,000 DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES (ACORD 101, Additional Remarks Schedule, may be allached if more space Is required) Re: Golden Shores Park, Sunny Isles Beach, Golden Shores Street Lighting No, 200901. City of Sunny Isles Beach is included as additional insured regarding General Liability & Auto as required by written contract. Waiver of Subrogaton applies to General Liability Auto and Workers Compensation as required by written contract. City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach (2016/03) ACORD 25 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AVTHORI2ED REPRESENTATIVE ©1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD 2020 FLORIDA PROFIT CORPORATION ANNUAL REPORT DOCUMENT# P06000007050 Entity Name: AUM CONSTRUCTION INC. Current Principal Place of Business: 424 SW 7TH ST., #402 MIAMI, FL 33130 Current Mailing Address: 8950 NW 119TH ST HIALEAH GARDENS, FL 33018 US FEI Number: 20-8608887 Name and Address of Current Registered Agent NUNEZ, RODOLFO 255 UNIVERSITY DRIVE CORAL GABLES, FL 33158 US Certificate of Status Desired: No The above named entity submits this statement Ior the purpose o/changing its registered office or registered agent, or both, in the Stale of Florida. SIGNATURE: RODOLFO NUNEZ 01/22/2020 Electronic Signature of Registered Agent Date Officer/Director Detail Title SECRETARY Name ARACIL, JUAN Address 424 SW 7 ST 402 City -State -Zip: MIAMI FL 33130 Title PT Name ORTIZ, HUMBERTO Address 8950 NW 119 ST City -State -Zip: HIALEAH GARDENS FL 33018 Title V Name GONZALEZ, PATRICIA Address 8950 NW 119 ST City -State -Zip: HIALEAH GARDENS FL 33018 f heroby certiry That the in(nrmation indicated on This report or supplemental report is true antl accurate and Iha(my electronic signature shall have the same legal el/ec( as it made under oath; (hat I am an officer ordirector o/Ihe corporation or (he receiver or trustee empowered to execute This report as required by Chapter fi07, Florida S(a(ufes: and that my name appears above, oron an attachment with all other like empowered. SIGNATURE: HUMBERTO ORTIZ PRESIDENT 01/22/2020 Electronic Signature of Signing Officer/Director Detail Date Form Enter your TIN in the appropriate box. The TIN provided must match the name given on the "Name" line I Social security W-9 Request for Taxpayer Give Form to the (Rev. August 2013) Identification Number and Certification requester. Do not Department of me Treasury send to the IRS. Internal Revenue Service Name (as shown on your income tax return) AUM Construction, Inc. Business name/disregarded entity name, if different from above W Check appropriate box for federal tax classification: Exemptions (see instructions): C a ❑ Individuallsole proprietor ❑ C Corporation E]S Corporation ❑ Partnership p ❑ Trust/estate a o Exempt payee code (if any) c❑ Limited liability company. Enter the tax classification (C=C corporation, S=S corporation, P=partnership) ► Exemption from FATCA reporting (If any) _code p`, u ❑ Other (see Instructions) ► !e U Address (number, street, and apt. or suite no.) Requester's name and address (optionao a 8950 NW 119th ST City, state, and ZIP code in Hialeah Gardens Florida 33019 list account number(s) here (optionatt IZ JM Taxpayer Identification Number (TIN) number � to avoid backup withholding. For individuals, this Is your social security number However, fora _ m —� resident alien, sale proprietor, or disregarded entity, see the Part I instructions onn page 3. For other entities, it is your employer identification number (EIN). If you do not have a number, see How to get a FM TlN on page 3. Note. If the account is in more than one name, see the chart on page 4 for guidelines on whose Employer identification number number to enter. F—T-1 Under penalties of perjury, I certify that: 1. The number shown on this form is my correct taxpayer identification number (or I am waiting for a number to be issued to me), and 2. 1 am not subject to backup withholding because: (a) I am exempt from backup withholding, or (b) I have not been notified by the Internal Revenue Service (IRS) that I am subject to backup withholding as a result of a failure to report all interest or dividends, or (c) the IRS has notified me that I am no longer subject to backup withholding, and 3. I am a U.S. citizen or other U.S. person (defined below), and 4. The FATCA codes) entered on this form (if any) indicating that I am exempt from FATCA reporting is correct. Certification instructions. You must cross out item 2 above if you have been notified by the IRS that you are currently subject to backup withholding because you have failed to report all interest and dividends on your tax return. For real estate transactions, item 2 does not apply. For mortgage interest paid, acquisition or Vandonment of se. cur property, cancellation of debt, contributions to an individual retirement arrangement (IRA), and generally, payments other th inter st and dividends,. you are not required to sign the certification, but you must provide your correct TIN. See the instructions of page 3. ,.� ` , ryrt I Signature of Here us.person ► Generallnstructions Section references are to fhe Internal Revenue Coda unless otherwise noted. Future developments. The IRS has created a page on IRS.gov for information about Form W-9, at www.irs.gov/w9. Information ahout any future developments affecting Form W-9 (such as legislation enacted after we release it) will be posted on that page. Purpose of Form A person who is required to file an information return with the IRS must obtain your rect taxpayer identification number (iIN) to report, for example, income paid to you, payments made to you in settlement of payment card and third party network transactions, real estate transactions, mortgage interest you paid, acquisition or abandonment of secured property, cancellation of debt, or contributions you made o an IRA. Use Form W-9 only if you are a U.S. person (Including a resident alien), to provide your correct TIN to the person requesting it (the requester) and, when applicable, to: 1. Certify that the TIN you are giving is correct (or you are wafting for a number to be issued), 2. Certify that you are not subject to backup withholding, or 3. Claim exemption from backup withholding if you are a U.S. exempt payee. If applicable, you are also certifying that as a U.S. person, your allocable share of any partnership income from a U.S. trade or business is not subject to the Date ► withholding tax on foreign partners' share o� effectively connecteo income, and 4. Certify that FATCA codes) entered on this form (if any) indicating that you are exempt from the FATCA report ing, is coned. Note. If you are a U.S. pereon and a requester glues you a form other than Form W-9 to request your TIN, you must use the requester's form If it is substantially lar to this Form W-9. Definition of a U.S. person. For federal tax purposes, you are considered a U.S. person If you are: • An Individual who is a U.S. citizen or U.S. resident alien, • A partnership, corporation, company, or association created or organized in the United States or under the laws of the United States, • An estate (other than a foreign estate), or • A domestic trust (as defined in Regulations section 301.7701-7). Special rales for partnerships. Partnerships that conduct a trade or business in the United States are generally required to pay a withholding tax under section 1446 on any foreign partners' share of effectively connected taxable Income from such business. Further, in certain cases where a Form W-9 has not been received, the rules under section 1446 require a partnership to presume that a partner is a foreign person, and pay the section 1446 withholding tax. Therefore, if you are a U.S. person that is a partner in a partnership conducting a trade or business in the United States, provide Form W-9 to the partnership to establish your U.S. status and avoid section 1446 withholding on your share of partnership income. Cat. No. 10231X Form W -`J (Rev. 8-2013) on 2. Qualit cat ons, Experience aast Performance AUM Construction, Inc. (AUM) is highly qualified and suited to successfully implement this very important project for the City of Sunny Isles Beach. AUM has recently completed 3 major LED lighting projects for the Florida Department of Transportation (FDOT), and we are currently working on a multi-million dollar project for FDOT, Hurricane Irma Street Lighting Repairs, that include 12 different locations thought-out Miami -Dade. We are substantially ahead of schedule in the Hurricane Irma work which will allow us to assign our multiple work crews to this project. We have always completed all of our projects on time and within budget. Our company philosophy has always been to work as a partner with our clients and we do not believe in pursuing change orders or claims that have no validity. In addition, AUM is also the street lighting maintenance contractor for Miami -Dade County. AUM maintains more than 13,000 streetlights on both County and FDOT roads from NW 36 Street to the Broward County line, including the Beaches & Ke.y Biscayne. We are keenly aware of all the issues that affect the installation and maintenance of all types of streetlighting systems and we are ready to provide our services to the City. Please refer to the attached AUM Company Profile to review our array of services we offer and list of clients. AUM Company Profile: AUM Construction, Inc. (AUM) is a Florida State Certified Electrical and General Contractor specializing in Transportation Lighting, Signalization and Intelligent Transportation Systems (ITS) since 2006. The company is also SBE/DBE Certified in the counties of Miami -Dade, Broward, Palm Beach and the State of Florida. The firm provides a broad spectrum of electrical services to the construction industry, providing talent, resources, equipment, and professional performance to complete every project on budget and on time. AUM combines time -tested techniques with leading-edge technology to deliver superior results that consistently exceed clients' expectations. In addition, we have the ability to bond large projects. AUM combines the perfect blend of professional talent, technical resources and an unwavering commitment to client satisfaction to produce the highest quality electrical construction for its projects. The firm strives to complete its work with attention to detail, quality, productivity and safety. AUM continuously seeks to improve and advance its performance through its professional development programs and quality controls AUM facilitates a staff of more than 50 electricians, engineers, designers, technicians, and equipment operators. Our achievements are driven by our experienced leaders and talented employees within our company. Our approach to delivering projects is complementary, which means that we can put together the best groups to form tailored project teams to deliver to clients. Our facility includes over 35 vehicles, ranging from jobbing vans, directional bore machine, cranes, drill rig, 80 -foot bucket trucks, concrete truck and boom trucks. All vehicles are inspected on a regular basis and are professionally maintained at our in-house maintenance facility. The firm's clients include private corporations and public agencies. Its assignments range from small, single -day assignments to large, multi-year contracts. We have provided street light maintenance services for the past 10 years to the following agencies just to name a few: • Miami -Dade County • Broward County Palm Beach County Miami -Dade County Expressway Authority (MDX) City of Weston City of Doral City of Key Biscayne Traffic Signalization /Street Lighting AUM has an excellent safety record and strictly adheres to all safety guidelines and standards set by national, state and municipal regulatory agencies and trade associations. We always ensure the health, safety and welfare of all our employees, customers and the public affected by our works. Our Services AUM is licensed and pre -qualified in Florida to perform traffic signal and street lighting work consisting of some of the following scope: • Traffic Signalization installation, modification and repair Traffic Signal Controller installation and maintenance High Mast Pole lighting Highway and Road Sign installation Highway and Street Light installation and repair Bridge Lighting Sports Lighting Red Light Cameras Installation and Maintenance Video Detection and BlueToads • License Plate Readers Intelligent Transportation Systems (ITS) AUM builds and maintains Intelligent Transportation Systems (ITS) throughout Florida. ITS increases the capacity and dependability of our transportation system and helps it to operate with improved efficiency and safety. AUM continues to advance ITS systems installations in its market. ITS Installation Services: • Intelligent Transportation Systems/Highway Advisory Systems • DMS Systems (Dynamic Message Signs) Vehicular Video Monitoring and Identification Cameras Vehicular and Speed Radar Detectors • In -Pavement Detectors Project List: 1- T4468, Broward County a- Project Name: SR -848 (Stirling Road) @ 1-95 Street Lighting b- Owner: FOOT District 4, 5548 NW 9 Ave Fort Lauderdale, FL 33309 c- Address: SR-848(Stirling Road) @ 1-95 d- Contact Person: Timothy Butler, Phone No. 954-958-7646 e- Contract Amount: $ 199,400.00 f- Date of Completion: 8/16/2018 g- Description of Work: The improvements under this contract consisted of roadway lighting installation and maintenance along SR 848. (Sterling Rd) h- Change Orders: None 2- T6453, Miami Dade a- Project Name: SR 7 (NW 7 Ave) from SW 6 St to NW 62 St Street Lighting b- Owner: FDOT District 6, 1000 NW 111 Ave Miami, FL 33172 c- Address: SR 7 (NW 7 Ave) from SW 6 St to NW 62 St d- Contact Person: Dru Badri, Phone No. 305-401-1560 e- Contract Amount: $ 242,600.50 f- Date of Completion: 4/5/2019 g- Description of Work: The improvements under this contract consisted of roadway lighting installation and maintenance along SR 7. (NW 7 Ave) h- Change Orders: None 3- T6459, Miami Dade a- Project Name: Street Lighting Improvements at SR 7 (NW 7 AVE) FROM NW 63 ST TO NW 215 ST, SR 933 FROM NW 20 ST TO NW 33 ST AND SR 5 FROM NE 123 ST TO NE 213 ST b- Owner: FDOT District 6, 1000 NW 111 Ave Miami, FL 33172 c- Address: SR 7 (NW 7 AVE) FROM NW 63 ST TO NW 215 ST, SR 933 FROM NW 20 ST TO NW 33 ST AND SR 5 FROM NE 123 ST TO NE 213 ST d- Contact Person: Omar Mendoza, Phone No. 305-456-4848 e- Contract Amount: $ 11799.799.00 f- Date of Completion: 2/15/2020 g- The improvements under this contract consist of Pedestrian Lighting Retrofits at the signalized intersections along SR 7, SR 933 and SR 5 h- Change Orders: None 4- T6493, Miami Dade a- Project Name: Hurricane Irma Permanent Repairs b- Owner: FDOT District 6, 1000 NW 111 Ave Miami, FL 33172 c- Address: At various locations along Miami Dade County d- Contact Person: Omar Mendoza, Phone No. 305-456-4848 e- Contract Amount: $2,625,000.00 f- Date of Completion: Underway g- The improvements under this contract consist of Hurricane Irma street lighting permanent repairs. h- Change Orders: None 5- T6458, Miami Dade a- Project Name: Street Lighting repairs at US -1 b- Owner: FDOT District 6, 1000 NW 111 Ave Miami, FL 33172 c- Address: US 1 from Lejeune Rd to SE 4 St from NE 22 St to Sans Souci BLVD d- Contact Person: Omar Mendoza, Phone No. 305-456-4848 e- Contract Amount: $1,249,999.99 f- Date of Completion: 2/10/2020 g- The improvements under this contract consist of Hurricane Irma street lighting permanent repairs. h- Change Orders: None 6- T6457, Miami Dade a- Project Name: Signalized Intersections Lighting Improvements b- Owner: FDOT District 6, 1000 NW 111th Ave, Miami, FL 33172 c- Address: US 1 from SW 348 St to Granada BLVD. d- Contact Person: George Hoffman, Phone No. 305-962-4928 e- Contract Amount: $1,599,999.99 f- Date of Completion: 3/20/2020 g- The improvements under this contract consist lighting improvements along US 1. h- Change Orders: None 52 employees including Project Managers, Masters Electrician, Journeyman and Helpers. Each crew has been specialized in specific functions like Directional Bore, Underground, Concrete, MOT, Street Lighting and Traffic Signal. All the employees have experience working in projects for Miami Dade County, Broward, and Palm Beach. Humberto Ortiz President &Qualifier Javier Chang Armando Acebal Roberto Anca Project Manager Project Manager Project Manager Crews Crews Crews Javier Chang will be the project manager for this contract, he has 3 crews for the installation of light poles, luminaires, and cable splicing, L cI ew for concrete and 2 for all the underground work. Javier Chang Project Manager l Osmany Oramas Alexander Garcia Danilo Caballero Journeyman Electrician Journeyman Electrician Journeyman Electrician Helpers: Eralio Gonzalez Guillermo sarduy Helpers: Isbel de La Rosa Bryce Martinez Helpers: Federico Mellano Rafael Breton Javier Chang Project Manager l � Geovany Davalos Carlos Vega Bryan Nicot Concrete, Asphalt, Restoration Underground Crew Leader Underground Crew Leader Crew Leader Helpers: Oscar Zelaya Luis de la Rosa Helpers: Rubert Roman Modesto Perez 3- Experience and qualifications of staff: Included are the resumes for the key personnel. Helpers: Mauricio Vaca Alfredo Gutierrez Eudis Saul Mendez Javier J. Chang 1532 Bay Road, Miami Beach, FL 33139 SKILLS • Highly developed computer literacy stills • Excellent mule -tasking and time management • Well organized and proficient with detaIls • Self-directed and dedicated team player EXPERIENCE — 9 Years AUM Construction Inc. —Project Manager• January 2018 to Present iichang31 O1.wgmau. com 305-519-4425 • Driven with excellent work ethics • Great communication skills; b lingual • Excellent troubleshooting and analytical skills • Self -motivator and ability to motivate others Current Projects/Completed Projects: Miami Beach Safe Routes to Schools LAP - $525,000 Safe Routes to Schools Miami Dade County 20150134 LAP - $523,000 Safe Routes to Schools Miami Dade County 20160221 LAP - $479,000 Safe Routes to Schools Nliatni Dade County 20160349 LAP - $495,000tb Sunrise Boulevard and Satin Leaf Way Intersection Improvements - $574,000 SW 328 Street Reconstruc on - $1,700,000 Stirling Road and I-95 Intersection Improvements T4468 - $199,000 Pine Island Road Intersection Improvements - $4975000 T4483 FDOT Browaxd County Lighting Improvements Grouping Projects - $133003000 SW 88' Street from US -1 to SW 65 Court Reconstruction - $1,200,000 FDOT SW 8`h Street and 147'b Avenue Intersection Improvements - $1,800,000 T6458 FDOT Retrofit Lighting Project Biscayne Boulevard - $1,000,000 T6459 FDOT Retrofit Lighting Project Aventura/SR 7 - $2,000,000 New Millennium Engineering April 2010 to January 2018 SR 826/1-75 Managed Lanes (Design -Build) - $247,000,000 - Jr Project Engineer/Project Administrator • April 2017 to Present • Part of the CEI Team representing the Florida Department of Transportation. Manage all monthly progress payments by quantifying and estimating each line item for all work performed on the project. Manage quality control verification of materials such as concrete, steel, earthwork etc. Verify all materials are in compliance with Specifications and design standards. Manage all design submittals, review and track shop drawtigs, RFI's, RFM's and RFC's. Review, stamp and approve sign and sealed plan sets to be released for construction ° Prepared take -offs and estimates for major plan changes. Negotiate costs and constriction means and methods for change orders. Tracking project time. Review of contractor's monthly CPM Schedules Work closely FDOT representative updating them with project status reports. Track project traffic mobility off of traffic detection systems installed throughout the project. Flagler Grouping Projects $45,000,000 -Contract Support Specialist/Project Administrator February 2016 to April 2017. Part of the CEI Team representing the Florida Department of Transportation. ° Manage all monthly progress payments by quantifying and estimating each line item for all work performed on the project. Manage quality control verification of materials such as concrete, steel, earthwork etc. Verify all materials are in compliance with Specifications and design standards. Manage all design submittals, review and track shop drawings, RF I's, RFM's and RFC's. Prepared take -offs and estimates for major plan changes. ° Negotiate costs and construction means and methods for change orders. Tracking project time. ° Work closely FDOT representative updating them with project status reports. Track project traffic mobility off of traffic detection systems installed throughout the project. ° Coordinating and managing all Pre -construction Utility operations to ensure all utility work is completed prior to project commencement Coordinating contractor operations with Utility companies Reviewing all lane closures and maintenance of traffic operations minimizing impacts on existing business and residences SR 826/1-75 (Managed Lanes (C)esign-E) uildJ - $47,000,000 - Contract support Specialist March 2014 to February 2016. Part of the CEI Team representing the Florida Department of Transportation. ° Assisted in managing all monthly progress payments by quantifying and estimating each line item for all work performed on the project. Manage quality control verification of materials such as concrete, steel, earthwork etc. Verify all materials are in compliance with Specifications and design standards. Prepared take -offs and estimates for major plan changes. Tracking project nine. Review of contractor's monthly CPM Schedules r. • r- 11 I i I I -- -. January 2012 to Match 2014 Past of the CEI Team representing the Florida Department of Transportation. Assisted in managing all monthly progress payments by quantifying and estimating each line item for all work performed on the project. Prepared take -offs and estimates for minor plan changes. ° Tracking project time Assisted in review of contractor's monthly CPM Schedules Performed office administrative duties SR 826 Section /I Reconstruction - $18%000,000 —Intern ° April 2010 to)amiary 2012 Part of the CEI Team representing the Florida Department of Transportation. Assisted in managing all monthly progress payments by quantifying and estimating each line item for all work performed on the project. Assisted Roadway and Bridge inspectors in verifying field operations Assisted Roadway and Bridge inspectors in quantifying all construction progress ° Entered all daily reports into the MOT Site Manager system. ° Performed office administrative duties Rufo Morales Mobile: (786) 355-9815 E-mail: Ruf62000(n.aol.com Text: 7863559815(2mymetropcs.com QUALIFICATIONS ✓ 37 years' experience in the elech7cal field. ✓ Master electrician license since 1996 ✓ HILTI Firestop Systems certification ✓ Completed Click Safety Competent Person, Fall Protection training course 2017 ✓ Able to read, write and communicate proficiently in English and Spanish ✓ A+ certification ✓ Network+ certification MCTS: Windows 7, Configuration certification MCTS: Windows Server 2008 Network Infrastructure, Configuration certification MCP: Microsoft Certified Professional ✓ MCSA: Windows 7 certification ✓ MCITP: Enterprise Desktop Support Technician on Windows 7 certification ✓ United States Air Force honorably discharged veteran WORK HISTORY AUM Construction, Inc. Hialeah Gardens, Florida September 2018 -present Project Manager/ Quality Control Overseeing directional boring division of company. Overseeing quality control of electrical installations. Hypower, Inc. Fort Lauderdale, Florida October 2016 -September 2018 Leadman ■ Oversaw the lighting portion of the 120,000 square feet Convention Center at Turnberry Isle in Aventura. ■ Worked 4 months continuously; 12 hours daily; at Cable USA a wire production plant in Naples, Florida after hurricane Irma moving equipment from a collapsed bay to a functioning bay. ■ Installed temporary power to machines to put production lines into use and then permanent power while machines continued to produce wire. ■ Tracked daily consumption loads of machines as they went online to balance existing electrical designs. ■ Installed single and three-phase motors, transformers and panelboards throughout to accommodate added production lines. Installed control wiring to equipment on production lines and cooling systems used throughout plant. Troubleshot and repaired periodically when production lines went down. ® Traced all existing wiring from all distribution panels and panelboards and labeled each. ® Drew one line and overhead drawings of all distribution panels, panelboards and transformers. ® Worked at the Auto Vault and Tesla dealership building in Miami, Florida running the main feeder conduits to all the electrical rooms. ® Installed and terminated all the switch gear, panelboards, transformers, transfer switches and generator on the roof. ® Installed electrical systems for the super chargers to the electric cars. ® Wired 2 different lighting control systems for the building. Self Employed Sub Contractor South Florida Jamtarp 2010- September 2018 Electrical Service and Repair ® Diagnosed and repaired electrical issues with lighting and power in both residential and commercial environments. ® Installed residential and commercial appliances and fans. ® Installed residential and commercial lighting fixtures and controls. Installed residential and commercial motors and motor controls. ® Added lines for power, lighting, audio, visual and computers. ® Upgraded panels and services. Self Employed Sub Contractor South Florida February 2007- September 2.018 Computer Repair Technician ® Performed on-site repair and preventive maintenance on personal computers, laptops and related peripherals. Set up and solved problems with computer network systems, cabling and wireless networks. ® Removed spyware and malware. Performed PC tune ups and upgrades. ® Provided data recovery and password resetting. ® Built and configured custom computers to client's specifications. The Academy of South Florida Miami, Florida Maxch 2015 -September 2015 Intern Helpdesk Support ® Addressed customer issues and resolved moderately complex problems in the areas of systems configuration/ setup, product functionality, and systems enhancements. 1\ational Construction Workforce Indianapolis, Indiana February 2014 -July 2014 Project Supervisor ® Led team of 2 foremen and 40 electricians in the construction of Icon Bay; a 43- story luxury waterfront condominium off of Biscayne Boulevard in Miami. ® Tracked daily activities of all personnel for sub -contractor billing. ® Coordinated daily with contractor on task allocations and material requisitions. Oversaw daily material and tool distribution and collection. ® Project liaison between contractor and sub -contractors and their personnel. Kennedy Electric, Ina Yuiee, Florida November 2013 Joumeyman Electrician ® Worked on the temporary power for the job site and office trailers for a Walmart in Boynton Beach that was coming up out of the ground. Erwin Electric, Inc. Tampa, Florida August 2013 Journeyman Electrician Worked on the addition of a sewage pumping and processing station in Immokalee at the Immokalee Water and Sewage Plant. Gulf Electric Company Thonotosassa, Florida May 2013 -July 2013 Journeyman Electrician Worked on the installation of power feeds to equipment and lighting at the Goodwill laundry facility in Miami, a high volume commercial laundry. TASCO Electrical Contractors, Inc. Hialeah, Florida May 2010 -March 2011 Project Supervisor ® Supervised the construction of 2 fire stations. Homestead Fire Rescue Station No. 16 and Doral North Fire Rescue Station No. 69. ® Coordinated and supervised both jobs simultaneously after the 3 month period between startups. Industrial Electric and Instrumentation, Ina Miami, Florida June 2003 -Nov 2009 Project Supervisor Directed the project at the Melreese Country Club in Miami. The very first city building that was LEED Silver Certified. The project included the installation of an FPL underground feeder over 500 feet long, a parking lot and exterior lighting system that was controlled by an energy management system, a commercial kitchen with banquet facilities that included a fluorescent dimming system, a pro shop, locker rooms and offices. ® Oversaw the installation of electrical utility cost reducing surge suppression systems at the Budweiser distribution center in Fort Lauderdale and Barfield Aviation Technologies in Miami. ® Scheduled and coordinated an afterhours upgrade to the fire alarm and computer systems at the J C Penny store in Hialeah. ® Oversaw the completion of several restaurants that included Brio Tuscan Grille, Fleming's Steak House, Chispa, Zuea's, Cheeseburger in Paradise, La Cofi4adia, and Sasha's Cafd. Supervised the completion of several banks, office build outs, and multipurpose warehouses. Supervised the upgrade to the fire alarm system and the installation of a CCTV system at the Winston Towers residential complex in Sunny Isles Beach that included installation of devices in over 400 occupied residential units. A -Plus Electric Services, Inc. Miami, Florida Electrical Foreman 2003 Led team of six electricians in the installation of CCTV and gate entry system for the parking garages at the Miami International Airport. Oversaw the installation of thousands of feet of underground and overhead conduits and components for fiber optic cables. United States Coast Guard Opa Locka, Florida 2002 Electrical Supervisor Planned and coordinated the completion of a 12 month back log in the electrical maintenance department. Completed several in-house construction renovations and remodeling projects. Tra ned in -coming seamen on occupational hazards, safety precautions, Local and national codes and proper usage of trade tools. A -Plus Electric Services, Inc. Miami, Florida Fire Alarm Superintendent 2001-2002 Led team of 3 foremen and 25 electricians in the installation of a Simplex fire alarm system at the Miami -Dade Water and Sewer Headquarters with over 1000 devices in a 5 -story office building and an adjacent 10 story -parking garage. Worked closely with engineers and other trades to provide a code compliant and working system. Scheduled and coordinated an accelerated installation with multiple shifts and round the clock operations. Danilo Caballero Mobile: (863)235-0350 E-mail: daniloCaballero39@,yahoo.com QUALIFICATIONS ✓ 8 years' experience in the electrical field. ✓ Journeyman electrician license since 2017 ✓ State of Florida CDL Class A driver's license ✓ 30 -Hour OSHA Hazard Recognition Training for the Construction Industry ✓ Completed Click Safety Competent Person, Fall Protection training course 2017 Certified on 19' scissor lifts ✓ Certified on 26' scissor lifts WORK HISTORY AUM Construction, Inc. Hialeah Gardens, Florida June 2019 -present Journeyman Electrician ■ Worked at Street Lighting Maintenance jobs. Hypower, Inc. Fort Lauderdale, Florida September 2017 -June 2019 Journeyman Electrician ■ Worked at the Circ Residences at Hollywood Circle in Hollywood, Florida running conduits, wiring and terminating circuits for lighting and power. ■ Terminated panelboards and transformers. Worked at Cable USA a wire production plant in Naples, Florida after hurricane Irma moving equipment from a collapsed bay to a functioning bay. ■ Installed temporary power to machines to put production line in use and then permanent power as machines continued to produce wire. Upgraded and replaced lighting throughout bay to accommodate new production lines.. Tri -City Electric, Inc. Miami, Florida Apri12017-September 2017 Journeyman Electrician ■ Worked at the Miami Marlins stadium in Miami, Florida running conduits, wiring and terminating circuits for lighting and power. ■ Worked at the Baptist Hospital in Kendall, Florida running conduits wiring and terminating circuits for lighting and power and terminating panelboards. Horton ,Tones Electrical, Inc. Wilton Manors, Florida September 2015 -March 2017 Journeyman Electrician ® Worked at the Memorial Hospital West in Pembroke Pines, Florida running conduits from 3/a inch to 4 inches and pulling wire in those conduits. ® Installed conduits and pulled wires for the fire alarm system. �1I One Electric, Inc. Hollywood, Florida January 2014 -August 2015 Electrician ® Worked at the University of Miami Hospital in Miami, Florida running conduits, wiring and terminating lighting and power circuits. Zachary Group Riviera Beach, Florida February 2011 -November 2013 Electrician ® Worked at the Riviera Beach power station during the initial construction of the plant on the wire pulling crew. Worked for extended shifts of 12 and 10 hours seven days continuously throughout the project. Employment History: 2017 -Present AN Construction, Inc Estimator & Electrician 2016.2017 Estimator Padron Electrical Contractor, Inc. 2013.2016 Electrical Engineer Mayabeque Electric Company Cuba Certifications: Journeyman Electrician Miami Dade County Engineering Intern, Florida Board of Professional Engineers Bachelor's in Electrical Engineering Jose Antonio Echevarria University City Havana Cuba Osmany Oramas, EI Project Estimator / Project Manager Professional Qualifications Mr. Oramas has over 7 years of experience in the electrical industry. Mr. Oramas has extensive experience in the construction and maintenance of traffic signalization, roadway lighting, and intelligent transportation systems (ITS). Professional Experience Mr. Oramas is responsible for all estimating for AUM Construction, Inc including preparation of all submittals and purchase orders for each project. Mr. Oramas has extensive experience in major ITS equipment specifications such as video vehicle detection cameras, CCTV, communication equipment, power distribution, standby power supply, lighting protection, Ethernet and fiber optic. Mr. Oramas also brings solid electrical engineering experience in the construction and maintenance of street lighting circuits working for Miami Dade and FDOT projects. Project Manager Experience: Speed Limits Signs IFB 2017.11.MS, City of Coral Gables. Furnish and Install new 25 MPH Speed Limit Signs and remove existing Signs. Contract amount: $ 149,999.60 Annual Contract for Traffic Loops 2017050, Palm Beach County Furnish and Install new Traffic Loops Detectors at different locations. Contract amount: $1,300,000.00 Welleby Tennis Center Light Project, City of Sunrise Installation of new light poles and electrical service around the Tennis Center. Contract amount: $733,733.00 Fernwood Road Lighting Improvements, Village of Key Biscayne Installation of new light poles and services around Fernwood Rd. Contract Value: 343,999.99 Skills: Project estimator, Transformers Maintenance .and Installation,. Street Lighting, Traffic Signal, ITS. Employment Hisfory., 2013 —Present AUM Construction, Inc Journeyman Electrician Street Lighting Technician 20082013 Horsepower Electric, Inc. Roadway Lighting Specialist Alexander Garcia ITS Traffic Signal Technician Professional Qualifications Mr. Garcia has over 10 years of experience in the electrical industry. Mr. Garcia has extensive experience in the construction and maintenance of traffic signalization, roadway lighting, and ntelligent transportation systems (ITS). Professional Experience FDOT Contract E6H99 Push Button Roadway Lighting —Providing labor, equipment, and materials for maintenance and repair of the Roadway Lighting System. City of Miami CRA Street Light Maintenance Omni Redevelopment Area, Southeast Overtown/Park West Area City of Miami Springs Curtis Parkway and North Royal Poinciana Blvd Bike Path Lighting Project FDOT Contract E6F27 Push Button Contract for Installations and Repairs to the State Roadway Lighting System — Installations and Repairs to the State Roadway Lighting System throughout the Counties of Miami Dade and Monroe. ATMS Field Installation Contract 20080113 — Install Miami -Dade County traffic signal cabinets, replace traffic controllers, modify traffic controller (firmware and communication), nstallation of loops, conduits, and pull boxes. Maintenance of the controller cabinet and its components and any non -cabinet equipment modified and/or installed as part of this project. Miami Dade County ARRA Street Light Improvements — Installation of new street lighting ncluding foundations, conduits, street light poles, wiring and electrical services. Red Light Camera Traffic Safety Program Contract — Installation of CCTV cameras, photo enforcement cameras, vehicular detectors, and wireless communication systems throughout south and central Florida area. Reversible Lane Control Contract No, 20070587 — Provide and install reversible lane control signals and blank -out message signs, CCTV cameras and coaxial cables, video encoders and decoders, Ethernet switches and routers, fiber optic controller assemblies, installation of County specified firmware and new central control equipment with County specified software, configuration, integration and testing of these traffic control systems, firmware and software. City of Hallandale Solar Pedestrian Lighting — Installation of solar lighting along NW/SW 8�1 Avenue in the City of Hallandale Miami Dade County Push Button Traffic Signal Installation Project # 20160045 Contract Amount $1,100,045- Supervision of all installation and implementation of traffic signal construction throughout Miami Dade County, Taft St & North Park Rd Intersection Improvements — Installation of new street lighting including foundations, conduits, street light poles, wiring and electrical services. Contract amount $ 455,000 Employment History: 6/5/2015 -Present AUM Construction, Inc Foreman Certifications: Traffic Signal Technician Level I Traffic Signal Technician Level II MOT Certification Work Zone Temporary Traffic Control Technician Bryan Nicot Professional Qualifications Mr. Nicot has over 10 years of experience in the electrical industry. Mr. Nicol has extensive experience in the construction and maintenance of traffic signalization, roadway lighting, and intelligent transportation systems (ITS). Professional Experience FDOT Contract E6H99 Push Button Roadway Lighting —Providing labor, equipment, and materials for maintenance and repair of the Roadway Lighting System. FDOT Contract E6F27 Push Button Contract for Installations and Repairs to the State Roadway Lighting System — Installations and Repairs to the State Roadway Lighting System throughout the Counties of Miami Dade and Monroe. ATMS Field Installation Contract 20080113 — Install Miami -Dade County traffic signal cabinets, replace traffic controllers, modify traffic controller (firmware and communication), nstallation of loops, conduits, and pull boxes. Maintenance of the controller cabinet and its components and any non -cabinet equipment modified and/or installed as part of this project. Miami Dade County ARRA Street Light Improvements — Installation of new street lighting ncluding foundations, conduits, street light poles, wiring and electrical services. Red Light Camera Traffic Safety Program Contract — Installation of CCTV cameras, photo enforcement cameras, vehicular detectors, and wireless communication systems throughout south and central Florida area. Reversible Lane Control Contract No. 20070587 — Provide and install reversible lane control signals and blank -out message signs, CCTV cameras and coaxial cables, video encoders and decoders, Ethernet switches and routers, fiber optic controller assemblies, installation of County specified firmware and new central control equipment with County specified software, configuration, integration and testing of these traffic control systems, firmware and software. Miami Dade County Push Button Traffic Signal Installation Project # 20160045 Contract Amount $1,100,045- Supervision of all installation and implementation of traffic signal construction throughout Miami Dade County. Taft St & North Park Rd Intersection Improvements — Installation of new traffic signal ncluding foundations, conduits, mast arm video detection cameras, wiring and electrical services. Contract amount $ 455,000 Miami Dade County Push Button Traffic Signal Installation 20160055 North Contract Amount $1,112,562.00-- Supervision of all installation and implementation of traffic signal construction throughout Miami Dade County, Miami Dade County Push Button Traffic Signal Installation 20160056 South Project # 20160045 Contract Amount $1,082,325.00- Supervision of all installation and implementation of traffic signal construction throughout Miami Dade County. Broward County, Sunrise Blvd & Satin Leaf WayMhite Seahorse Way (5437) Intersection Improvements Installation of new traffic signal including foundations, conduits, mast arm video detection cameras, wiring and electrical services. Contract amount $ 513,035. Broward County, Pine Island & Southgate BLVD (5436) Intersection Improvements Installation of new traffic signal including foundations, conduits, mast arm video detection cameras, wiring and electrical services. Contract amount $ 496,700. Employment History: 311812016 .Present AUM Construction, Inc Foreman Certifications Traffic Signal Technician Level Traffic Signal Technician Level II MOT Certification OSHA 10- hour Construction Safety & Health Carlos Vega Professional Qualifications Mr. Vega has over 10 years of experience in the electrical industry. Mr. Vega has extensive experience in the construction and maintenance of traffic signalization, roadway lighting, and ntelligent transportation systems (ITS). Professional Experience FDOT Contract E6H99 Push Button Roadway Lighting -Providing labor, equipment, and materials for maintenance and repair of the Roadway Lighting System. FDOT Contract E61`27 Push Button Contract for Installations and Repairs to the State Roadway Lighting System — Installations and Repairs to the State Roadway Lighting System throughout the Counties of Miami Dade and Monroe. ATMIS Field Installation Contract 20080113 — Install Miami -Dade County traffic signal cabinets, replace traffic controllers, modify traffic controller (firmware and communication), installation of loops, conduits, and pull boxes. Maintenance of the controller cabinet and its components and any non -cabinet equipment modified and/or installed as part of this project. Miami Dade County ARRA Street Light Improvements — Installation of new street lighting ncluding foundations, conduits, street light poles, wiring and electrical services. Red Light Camera Traffic Safety Program Contract — Installation of CCN cameras, photo enforcement cameras, vehicular detectors, and wireless communication systems throughout south and central Florida area. Reversible Lane Control Contract No. 20070587 — Provide and install reversible lane control signals and blank -out message signs, CCTV cameras and coaxial cables, video encoders and decoders, Ethernet switches and routers, fiber optic controller assemblies, installation of County specified firmware and new central control equipment with County specified software, configuration, integration and testing of these traffic control systems, firmware and software. Miami Dade County Push Button Traffic Signal Installation Project # 20160045 Contract Amount $1,100,045- Supervision of all installation and implementation of traffic signal construction throughout Miami Dade County. Taft St & North Park Rd Intersection Improvements• — Installation of new traffic signal including foundations, conduits, mast arm video detection cameras, wiring and electrical services. Contract amount $ 455,000 Miami Dade County Push Button Traffic Signal Installation 20160055 North Contract Amount $1,112,562.00- - Supervision of all installation and implementation of traffic signal construction throughout Miami Dade County, Miami Dade County Push Button Traffic Signal Installation 20160056 South Project # 20160045 Contract Amount $1,082,325.00- Supervision of all installation and mplementation of traffic signal construction throughout Miami Dade County. Broward County, Sunrise Blvd & Satin Leaf Way/White Seahorse Way (5437) Intersection Improvements Installation of new traffic signal including foundations, conduits, mast arm video detection cameras, wiring and electrical services. Contract amount $ 513,035. Broward County, Pine Island & Southgate BLVD (5436) Intersection Improvements Installation of new traffic signal including foundations, conduits, mast arm video detection cameras, wiring and electrical services. Contract amount $ 496,700. Employment History: 2015. Present AUM Construction, Inc Geovany Davalos Professional Qualifications Mr. Davalos has over 6 years of experience in the construction industry. He has work in jobs elated with the installation of sidewalk concrete, concrete pads, spread footers and asphalt. Professional Experience FDOT T6458 Street lighting Maintenance at US 1 from Lejeune Rd to SE 4 St. FDOT T6459 Street Lighting Maintenance at NW 7 Ave & NW 63 St. Miami Dade County Push Button Traffic Signal Installation 20160055 North Miami Dade County Push Button Traffic Signal Installation 20160056 South 1110181911141MIKOIN Name: Quality Paving Corp Address: 7875 SW 40TH. STREET SUITE # 229 MIAMI, FL 33155 Name: Torres Electrical Supply Company, Inc. Address: 3190 S.E. Dominica Terrace Stuart, FL 34997 Supplier: 2 Name: CED /Electrical Wholesalers Address: 3$40 West 104TH Street Suite #5 Hialeah, FI 3301$ Since the project does not currently have an established timeline, AUM is ready to develop an aggressive project schedule in coordination with the City. Since this is a very well-maintained neighborhood, we need to minimize the impacts and the duration of our work to the residents. We will strictly commit to the City's proposed daily work schedule hours to allow the residents to maintain easy access to their homes. We have assigned our most experienced Project Manager along with our senior lighting crews led by one of our three Master Electricians. As evidenced by our staffing organizational chart shown in Section 3 of this submittal, we will breakdown this project into different crews that specialize in their areas of work, i.e., underground, pre -cast foundation and pull box installations, pole installation and wiring and final restoration. This multiple crew approach allows AUM to progressively expedite the project completion at no additional cost to the City. AUM takes Safety as our number one priority for our clients, the public and our employees. Attached is a partial copy of our project specific Safety Plan for the Golden shores Street Lighting project. AUM CONSTRUCTION, INC. Site Specific Safety Plan Golden Shores Street Lighting Golden Shores Sunny Isles Beach, FL 33160 City Of Sunny Isles Beach 305-947-0606 Prepared by: AUM CONSTRUCTION, INC. n association with: U.S. Compliance Systems, Inc. Project Management: Javier Chang Project Manager 13054564848 This Site -Specific Safety Plan is current as of: 11/11/2020 Table of Contents Coronavirus Disease 2019 Policy Statement 6 Scope of Work 10 Site Safety Requirements 11 General Policies & Procedures 12 Stop Work Authority & Workers' Right to Refuse Dangerous Work Policy Statement 13 Site Specific Safety Plan Overview 15 Safety Director 15 Safety Program Administrator 16 Project Management 16 Competent Person 17 Employee Involvement 17 Subcontractor Involvement & Responsibilities 18 Accident/Injury Prevention 18 Safety Meetings 19 Housekeeping 19 Sanitation 19 Drugs, Alcohol, and Other Prohibited Behaviors 20 Workplace Violence 21 First Aid and First Aid Kits 22 Emergency Action Plan 24 Fire Prevention Plan 25 Enforcement 26 Site/Job Specific Policies and Procedures 27 Abrasive Wheels 28 Aerial Lifts & Live -Line Bare -Hand Work 29 Aerial Lifts 31 Combustible & Flammable Liquid Handling 32 Combustible Gas Indicators 33 Company Vehicles 34 Compressed Air 35 Compressed Gas Cylinders 36 Concrete and Masonry Construction 39 Concrete Cutting 43 Disposable Respirators 44 Earth Moving Equipment 45 Electrical Work - Workplace Safety 46 Elevated Work Platforms and Aerial Devices 55 Excavating, Trenching, & Shoring 59 Extension Cords 61 Flagmen -Traffic Control 62 Ground Fault Circuit Interrupters 63 Hazardous Job Site Chemical Awareness and Exposure 64 Heavy Construction Equipment 70 Hoists 73 Horizontal Directional Drilling (HDD) 73 Hot Tap Operations 74 Ladders 75 Lighting 77 LP - Gas Storage 78 LP - Gas Temporary Heating 79 Machine Guarding 80 Machinery 81 Material Storage 82 Mold & Mildew 83 NFPA 70E 84 Pile Driving 88 Pipe Tie-Ins 89 Rigging for Material Handling 90 Scissor-Lift Fall Protection 91 Signs & Tags 92 Silica Exposure 93 Stairs 102 Tools - Hand 103 Tools - Pneumatic Powered 104 Tools - Powder-Actuated 105 Ventilation 106 Welding, Cutting, & Brazing 108 Working Over or Near Water 111 Specific Compliance Programs 112 Bloodborne Pathogens 113 Confined Spaces in Construction 114 Cranes and Derricks in Construction 115 Fall Protection 116 Forklifts 117 Hazard Communication 118 Lockout/Tagout - Control of Hazardous Energy 119 Personal Protective Equipment - General 121 Personal Protective Equipment - Hearing Conservation Overview 122 Personal Protective Equipment - Respiratory Protection 123 Prevention of Heat and Cold Stress Scaffolds Coronavirus Disease 2019 Policy Statement Note: Guidance and criteria for Coronavirus Disease 2919 vary locally depending on current conditions. Check with your local health department for requirements specific to your location. the health of our employees is of utmost importance, as they are our most valuable asset. The following policy has been implemented to protect our employees to the greatest of our ability from the spread of Coronavirus Disease 2019 (COVID-19). COVID-19 is a respiratory disease that has spread from China to many other countries around the world, including the United States. Infection with SARS-CoV-2, the virus that causes COVID-19, can cause illness ranging from mild to severe and, in some cases, can be fatal. Regardless of potential occupational exposures, the following Pandemic Response Plan will be mplemented in order to limit the risk to our employees. Our employees will be trained in all aspects of our plan, and the plan will be available for review by workers and their representatives. Prevention and Precautions Our employees' risk of exposure will be continually assessed and evaluated. Controls to prevent exposure will be selected and implemented as appropriate, and workers will be required to use them. These include engineering controls such as physical barriers to control the spread of the virus; administrative controls such as no large meetings or gatherings and physical distancing; and appropriate personal protective equipment, hygiene, and cleaning supplies. a. Policies and practices, such as flexible worksites (e.g., telecommuting) and flexible work hours (e.g., staggered shifts), will be used if possible to increase the physical distance among employees and between employees and others. b. The workplace will be modified to increase physical space between employees, and between employees and customers, to 6 feet or more, where feasible. Signs, tape marks, or other visual cues will be used to indicate where to stand when physical barriers are not possible. c. Signs will be posted reminding workers, customers, and visitors to maintain at least six feet between one another. Directional signs will be posted in hallways/corridors where the width restricts movement and limits social distancing. d. On-site safety meetings will be adjusted to ensure physical distancing guidelines. When possible, other meetings and interviews will be conducted via phone or digital platforms or held outside. e. Workers will be discouraged from using other workers' phones, desks, offices, and other work tools and equipment, whenever possible. Shared items will be cleaned and disinfected before and after each use. f. Daily health/temperature checks will be conducted and/or employees will be encouraged to self-monitor/self-screen and notify their supervisor when they are sick or experiencing symptoms of COVID-19. Workers will be required to stay home if they are sick. g. Any employee exhibiting signs and symptoms of COVID-19 at work will be immediately separated from others and sent home. h. Employees are restricted to only essential travel to known COVID-19 high risk areas, and employees who have recently visited restricted areas must follow quarantine protocols. AUM CONSTRUCTION, INC. Page 6 ©2020 U.S. Compliance Systems, Inc. (888) 475-5353. Permission is granted to copy for internal use. Signs and Symptoms Symptoms of COVID-19 typically include fever, cough, and shortness of breath. Some people nfected with the virus have reported experiencing other non -respiratory symptoms such as fatigue, muscle or body aches, headache, new loss of taste or smell, sore throat, congestion or runny nose, nausea, vomiting, or diarrhea. Other people, referred to as asymptomatic cases, have experienced no symptoms at all. According to the CDC, symptoms of COVID-19 may appear in as few as 2 days or as long as 14 days after exposure. It may be possible that a person can get COVID-19 by touching a surface or object that has SARS-CoV-2 on it and then touching their own mouth, nose, or possibly their eyes, but this is not thought to be the primary way the virus spreads. The virus is thought to spread mainly from person-to-person, including: a. Between people who are in close contact with one another (within about 6 feet). b. Through respiratory droplets produced when an infected person coughs or sneezes. These droplets can land in the mouths or noses of people who are nearby or possibly be inhaled into the lungs. Workers will be allowed and encouraged to wear face coverings over their nose and mouth to prevent them from spreading the virus when talking, coughing, and/or sneezing if the use of a mask does not present or increase a hazard. Employees will be instructed in the proper use of face masks. Note: Cloth face coverings are not PPE, because they protect other people from the wearer's respiratory secretions, rather than protecting the wearer. Procedures for a Confirmed Case If an employee is confirmed to have COVID-19, fellow employees will be informed of their possible exposure to COVID-19 in the workplace, but confidentiality will be maintained as required by the Americans with Disabilities Act (ADA). Employees exposed to a co-worker with confirmed COVID-19 will be referred to CDC guidance for how to conduct a risk assessment of their potential exposure. Communication/Notification Procedure Important COVID-19 information will be communicated to our employees by small safety meetings, email, text, and/or telephone. a. A suspected employee illness will be communicated internally by the most effective, safe means possible using emails and/or phone messages. b. As the event evolves, we will communicate any necessary changes with our employees through workplace postings, emails, and/or phone messages. c. We will provide information on workforce readiness and precautionary measures for personnel reporting to 3rd party sites and projects via email and phone messages. Team Member Hygiene Frequent and thorough hand washing will be promoted, including by providing workers, customers, and worksite visitors with a place to wash their hands. a. If soap and running water are not immediately available, alcohol -based hand rubs containing at least 60% alcohol will be provided. b. Respiratory etiquette, including covering coughs and sneezes, will be required. c. Disposable gloves may be used to supplement frequent handwashing or use of hand sanitizer; examples are for workers who are screening others for symptoms or handling commonly touched items. AUM CONSTRUCTION, INC. Page 7 ©2020 U.S. Compliance Systems, Inc. (888) 475-5353. Permission is granted to copy for internal use. Facility Hygiene and Sanitation Procedures Regular housekeeping practices, including routine cleaning and disinfecting of surfaces, equipment, and other elements of the work environment such as doorknobs, light switches, handles, toilets, faucets, etc., will be maintained. a. Cleaning products with EPA -approved emerging viral pathogens claims (click here for a list of qualified disinfectants), diluted household bleach solutions (5 tablespoons per gallon of water), or alcohol solutions with at least 70% alcohol that are appropriate for the surface will be used. b. Workers will be trained on the chemical hazards, manufacturer's directions (e.g., concentration, application method and contact time, PPE), ventilation, and requirements for safe use. Sanitation and disinfection will need to happen after persons suspected/confirmed to have COVID-19 have been at the workplace. Areas visited by the ill persons will be closed off to all but those responsible for sanitation and disinfection. a. Outside doors and windows will be opened where possible and ventilating fans will be used to increase air circulation. in the area. Cleaning and disinfection will begin at least 24 hours (or as long as possible) after appropriate ventilation. b. Cleaning staff should sanitize and disinfect all areas such as offices, bathrooms, common areas, shared electronic equipment like tablets, touch screens, keyboards, remote controls, and anything else used by the ill persons, focusing especially on frequently touched surfaces. If needed, the space will be vacuumed with a vacuum equipped with high -efficiency particular air (NEPA) filter. Return to Work Employees with COVID-19 who have stayed home (home isolated) can stop home isolation after these three things have happened: a. At least 24 hours have passed since resolution of fever without the use of fever -reducing medications; AND b. Other symptoms have improved (for example, when your cough, fatigue, sore throat, or shortness of breath have improved); AND c. At least 10 days have passed since your symptoms first appeared. Note: A limited dumber of persons with severe illness may produce replication -competent virus beyond 10 days, that may warrant extending duration of isolation for up to 20 days after symptom onset. Consider consultation with infection control experts. See Discontinuation of Transmission -Based Precautions and Disposition of Patients with COVID-19 in Healthcare Settinas (Interim Guidance). A test -based strategy is no longer recommended to determine when to discontinue home isolation, except in consultation with infectious disease experts in certain circumstances for persons who are severely immunocompromised. For all others, the test -based strategy is only recommended to discontinue isolation or other precautions earlier than would occur under the symptom -based strategy outlined above. The test -based strategy requires two negative test results taken at least 24 hours apart. All test results should be final before isolation is ended. Note: See Interim Guidelines for Collecting Handling and Testing Clinical Specimens from Persons for Coronavirus Disease 2019 (COVID-19) AUM CONSTRUCTION, INC. Page 8 ©2020 U.S. Compliance Systems, Inc. (SSa) 475-5353. Permission is granted to . AUM CONSTRUCTION, INC. Page 8 ©2020 U.S. Compliance Systems, Inc. (SSa) 475-5353. Permission is granted to copy for internal use. A worker without symptorns who was diagnosed with COVID-19 can return to work only if 10 days have passed since the date of the first positive COV ID -19 test. If they ever develop symptoms, then the symptom -based or test -based strategy should be used. In all cases, follow the guidance of your healthcare provider and local health department. The decision to stop home isolation should be made in consultation with your healthcare provider and state and local health departments. Local decisions depend on local circumstances. We will continue to monitor public health communications about COVID-19 recommendations by frequently checking the CDC COVID-19 website. This Policy Statement will be conspicuously posted. Juan M. Aracil Safety Director AUM CONSTRUCTION, INC. Page 9 ©2020 U.S. Compliance Systems, Inc. (888) 475-5353. Permission is granted to copy far internal use. AUM CONSTRUCTION, INC. LEMMA JIIMT�l The Golden Shores Street Lighting project involves the removal of existing light poles, furnish and install new light poles & load centers and related restoration. AUM CONSTRUCTION, INC. Page i 10 ©2020 U.S. Compliance Systems, Ina (888) 475-5353. Permission is granted to copy for internal use. A UM CONSTRUCTION, INC. • Please note that the following site safety requirements go above and beyond OSHA requirements and must be followed at all times by all employees on site. If by chance one of the following requirements does not meet standards set by OSHA, the OSHA requirements will be followed. Detailed site safety requirements for the Golden Shores Street Lighting project will be finalized once contract is awarded. AUM CONSTRUCTION, INC. Page 111 ©2020 U.S. Compliance Systems, Inc. (888) 475-5353. Permission is granted to copy For internal use. AUM CONSTRUCTION, INC. Section I General Policies &Procedures Standards: CONSTRUCTION, 29 CFR 1926.16 - Rules of Construction 29 CFR 1926.20 - General Safety and Health Provisions 29 CFR 1926.21 - Safety Training and Education 29 CFR 1926.34 - Means of Egress 29 CFR 1926.35 = Employee Emergency Action Plans 29 CFR 1904 - Recordkeeping AUM CONSTRUCTION, INC. Page � 12 ©2020 U.S. Compliance Systems, Inc. (II88) 475-5353. Permission is granted to copy for internal use. Section 5% References Reference No 1: Dru Badri, PE Construction Manager — FDOT District 6 North Dade Construction 1000 NW 111 Ave Miami, FL 33172 dru.badri@dot.state.fl.us 305-401-1560 Reference No 2: Julio Navarro Street Lighting Division Manager DTPW 7100 NW 36 St Miami, FL 33166 Julio.Navarro@miamidade.gov 305-776-0532 Reference No 3: Yveins Jean-Pierre, PE Broward Construction Manager — FDOT District 4 5548 NW 9t" Ave Fort Lauderdale, FL 33309 Yveins. lean-Pierre@dot.state.fl.us 954-914-0293 a Standing and Authorize Sectio06v Corporate Signatory 2020 FLORIDA PROFIT CORPORATION ANNUAL REPORT DOCUMENT# P06000007050 Entity Name: AUM CONSTRUCTION INC. Current Principal Place of Business: 424 SW 7TH ST., #402 MIAMI, FL 33130 Curren4 Mailing Address: 8950 NW 119TH ST HIALEAH GARDENS, FL 33018 US FEI Number: 20-8608887 Name and Address of Current Registered Agent: NUNEZ, RODOLFO 255 UNIVERSITY DRIVE CORAL GABLES, FL 33158 US FILED Jan 22, 2020 Secretary of State 2561525195CC Certificate of Status Desired: No The above named entity submits this sta[emen(Ior the purpose o/changing its registered office or registered agent, or both, in (he Slate o(Florida. SIGNATURE: RODOLFO NUNEZ 01/22/2020 Electronic Signature of Registered Agent Officer/Director Detail Title SECRETARY Name ARACIL, JUAN Address 424 SW 7 ST 402 City -State -Zip: MIAMI FL 33130 Title PT Name ORTIZ, HUMBERTO Address 8950 NW 119 ST City -State -Zip: HIALEAH GARDENS FL 33018 Title V Name GONZALEZ, PATRICIA Address 8950 NW 119 ST City -State -Zip: HIALEAH GARDENS FL 33018 Dale I hereby cedi/y That the in/ormalion indicatetl on Ibis report or sup➢lemen(al report is (rue and accurate antl Thal niy elec(ronic signature shall have (he same legal of/ecl as if made under oath; that I am an o�cer or director of the corporation or the receiver or trustee empowered to execute this report as requiretl by Chapter 601, Florida S(atules; and that my name appears above, or on an attachment wi(h all o(herlike empowered. SIGNATURE: HUMBERTO ORTIZ PRESIDENT 01/22/2020 Electronic Signature of Signing Officer/Director Detail Date Title PT Name ORTIZ, HUMBERTO Address 8950 NW 119 ST City -State -Zip: HIALEAH GARDENS FL 33018 Title V Name GONZALEZ, PATRICIA Address 8950 NW 119 ST City -State -Zip: HIALEAH GARDENS FL 33018 Dale I hereby cedi/y That the in/ormalion indicatetl on Ibis report or sup➢lemen(al report is (rue and accurate antl Thal niy elec(ronic signature shall have (he same legal of/ecl as if made under oath; that I am an o�cer or director of the corporation or the receiver or trustee empowered to execute this report as requiretl by Chapter 601, Florida S(atules; and that my name appears above, or on an attachment wi(h all o(herlike empowered. SIGNATURE: HUMBERTO ORTIZ PRESIDENT 01/22/2020 Electronic Signature of Signing Officer/Director Detail Date �, � w. � .�' �. OF slit' P� QUALIFICATION REQUEST Contractor must list projects of similar project scope fulfilling the following qualifieation requests: 1. List Project Management Personnel. Personnel cannot be changed without written approval. Project Manager 2. How many years has your organization been in business as a General Contractor? 3. List minimum of three (3) previous similar public Bid construction projects, include: the Contractor's Project Manager, Project Name, Owner, Project Address, Contact person, Phone, Contract Amount, Date of Completion and Description of Work. 4. List current workload. City of Sunny Isles Beach � Invitation to Bid No. ZO-09-01 Q' P y` ��. i. 7R� S'•. O OF SAN P� 5. Will you subcontract any part of this work? If so, give details to major key subcontractor's name, address, phone number and type of work to be performed. Also, indicate the percentage of the total work to be performed by the subcontractor. 8. The business is a (dole proprietorship) (partnership) (corporation) and name of owner: 9. Has your company ever been debarred or terminated for default on a government contract? 10. Although not mandatory, is your company apre-qualified contractor through FDOT? 12. Identify your debris disposal plan. City of Sunny Isles Beach I Invitation to Bid No. 20-09-01 11. Discuss what strategies the submitter will utilize to keep this project on schedule. 12. Discuss strategies the submitter will implement to ensure the project is kept on budget. 13. Have you personally inspected the plans and location, are there any concerns that may impede your performance on this project? 5 14. Describe the submitter's attributes, which make the submitter best -suited for this project. City of Sunny Isles Beach � Invitation to Bid No. 20-09-01 f of 5Uµ END OF SECTYON City of Sunny Isles Beach I Invitation to Bid No. 20-09-01 ry or Soo P DELIVER T0: INVITATION TO BID City of Sunny Isles Beach SECTION 4 OPENING: 2:30 P.M. City Clerk BID SUBMITTAL FORMS 11/10/2020 18070 Collins Avenue Sunny Isles Beach, FL 33160 PLEASE QUOTE PRICES FURNISHED & INSTALLED, lzESS TAXES PROVIDED TO CITY OF SUNNY ISLES BEACH, FLORIDA NOTE: City of Sunny Isles Beach is exempt from all taxes (Federal, State, and Local). Bid price should Indude-be-le.w�alFtaxes. T@X EXeMP•O^^ Cel lflGabLz 41FRishedUPGR request, Issued by: Purchasing Agent Date Issued: This Bid Submittal Consists of 10-12-2020 Pages 1 through 29, and Applicable Plans and Specifications Sealed bids are subject to the Terms and Conditions of this Invitation to Bld and the accompanying Bid Submittal. Such other contract provisions, specifications, drawings or other data as are attached or ncorporated by reference in the Bid Submittal, will be received at the office of the City Clerk at the address shown above until the above stated time and date, and at that time, publicly opened for furnishing the supplies or services described in the accompanying Bid Submittal Requirement, IIB 20-09-01 GOLDEN SHORES STREET LIGHTING A Bid Deposit in the amount of 5% of the total amount of the bid shall accompany all bids A Performance Bond Firm in the amount of 100% of the total amount of the bid will be required upon execution of the contract by the successful bidder and City of Sunny Isles Beach Name: 40 nz �✓�G RETURN ONE ORIGINAL AND FOUR COPIES OF BID SUBMITTAL PAGES AND AFFIDAVITS FAILURE TO SIGN WHERE REQUIRED IN SECTION 4 BID SUBMITTAL WILL RENDER YOUR BID NON- RESPONSNE City of Sunny Isles Beach � Invitation to Bid No. 20-09-01 .rrf or SUN P� City of Sunny Isles Beach � Invitation to Bid No. 20-09-01 Golden Shores Street Lighting: Bid Tabulation Prepared For: City of Sunny Isles Beach Prepared By: Craven Thompson & Associates Date: 0/10/2020 Revised 10/29/20 CTA Project Number: 19.0035-001-01 City of Sunny Isles Beach Invitation to Bid Number: 20-09-01 Item Description ung Lid Unit Price Amount Quantity General Conclitiona 01 Mobilization / General Conditions LS 02 Maintenance of Traffc(M.O.T.) LS Subtotal General Conditions /IP/iWv 620 DEMOLITION 03 REMOVE EXISTING LIGHT POLE EA 32 Q 04 SAWCUT&REMOVE 2'STRIP OF ASPHALT LF 24,000 Subtotal Demolition H� SOG1 PROPOSED 05 SERVICE CONNECTION ALLOWANCE 4 $20,000.00 $80,000 06 CONDUIT INSTALLED IN EXISTING PAVEMENT LF 240000 IV 549 2 07 CONDUIT INSTALLED IN EARTH LF 400 ji, 00 dw, 00 08 p6 WIRE INSTALLED IN CONDUIT - LF 72,000 ,0 09 03 WIRE INSTALLED IN EARTH LF 11200 15000 0 10 LIGHT FIXTURE, POLE, PULLBOX COMPLETE EA 131 ,Q .0 11 PRE -CAST FOUNDATION EA 131 12 SPREAD FOUNDATION EA 1 Q 5, 13 TEMPORARYASPHALT SY 51333 -50 .6719 Subtotal Proposed q, 14 PROJECT CONTINGENCY (with Owner approval) ALLOWANCE 1 $200,000 $200,000 i5 BID TOTAL �/ "�9/ 1'7 �q 16 Value Engineering (VE) Deduct LS laOOD. 00 City of Sunny Isles Beach � Invitation to Bid No. 20-09-01 OF SUN P SECTION 6 BID SUBMITTAL FOR: ACKNOWLEDGEMENT OF ADDENDA INSTRUCTIONS: COMPLETE PART I OR PART II, WHICHEVER APPLIES PART I: LIST BELOW ARE THE DATES OF ISSUE FOR EACH ADDENDUM RECEIVED IN CONNECTION WITH THIS BID PART II: Addendum #1, Dated ,/©G �OFL/JI�� 2 / ZOZO Addendum #2, Dated ailzo doer 0 gi Z�ZO Addendum #3, Dated Nodemrdee- !o Zoo Addendum #4, Dated Addendum #5, Dated Addendum #6, Dated Addendum V. Dated Addendum #6, Dated ❑ NO ADDENDUM WAS RECEIVED IN CONNECTION WITH THIS BID AUTHORIZED SIGNATURE: TITLE OF OFFICER: City 0 f Sunny Isles Beach � Invitation to Bid No. 20-09-01 w SUN Pr. �1!�3rlluLY���L�r�1:3u1 Bid Title: GOLDEN SHORES STREET LIGHTING The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an agreement with The City of Sunny Isles Beach to perform and furnish all Work as specified or indicated in the Contract Documents for the Contract Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. The Bidder accepts all of the terms and conditions of the Advertisement or Invitation to Bid and Instructions to Proposers, including without limitation those dealing with the disposition of Bid Security. This Bid will remain subject to acceptance for 90 days after the day of Bid opening. The Proposer agrees to sign and submit the Agreement with the Bonds and other documents required by the Bidding Requirements within ten days after the date of the City's Notice of Award. In submitting this Bid, the Proposer represents, as more fully set forth in the Agreement, that The Proposer has familiarized himself/herself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Law and Regulations that in any manner may affect cost, progress, performance, or furnishing of the Work. • The Proposer has given the City written notice of all conflicts, errors, discrepancies thU t it has discovered in the Contract Documents and the written resolution thereof by City is acceptable to the Proposer. This Bid is genuine and not made in the interest of or on behalf of any undisclosed personI firm or corporation and is not submitted In conformity with any agreement or rules of any group, association, organization, or corporation; the Proposer has not directly or indirectly induced or solicited any other Proposers to submit a false or sham Bid; the Proposer has not solicited or induced any person, firm or corporation to refrain from Bidding; and Proposer has not sought by collusion to obtain for itself any advantage over any other Proposers or over the City. The Proposer understands and agrees that th e Bid is for unit prices to furnish and install individual Work Items for maintenance and/or repair work, complete in place. Estimates are provided for the purposes of Bid Evaluation and to establish unit prices for individual Work to be contracted by the City under individual Purchase Orders, based on the unit prices established under this Bid. The City and the successful Proposer will establish completion times for each individual Work Item and the successful Proposer agrees that the work will be completed within the time frames agreed upon and stipulated in the individual Purchase Orders and/or Notice to Proceed. City of Sunny Isles Beach � Invitation to Bid No. 20-09-01 � Firm Name: /'?!�( / tljp, G Oti, Street Address: Mailing Address (if different): 1`z 1Ya /ea P1,r�k 33w/& % Telephone No.2/%Oy Fax No. Email Address: 71 O�Ll //M %NG. (/S FEIN No.;? �j6 $/j�/P-3� * "By signing this document the bidder agrees to a// Terms and conditions of this Invitation to BJd. &n (Signature Print Name: THE EXECUTION OF THIS FORM CONSTITUTES 7HE UNEQUIVOCAL OFFER OF PROPOSER TO BE BOUND BY THE TERMS OF ITS PROPOSAL. FAILURE TO SYGN THIS SOLICITATION WHERE INDICATED ABOVE BY AN AUTHORIZED REPRESENTATIVE SHALL RENDER THE PROPOSAL NON-RESPONSIVE. THE CITY MAY, HOWEVER, IN ITS SOLE DISCRETION, ACCEPT ANY PROPOSAL THAT INCLUDES AN EXECUTED DOCUMENT WHICH UNEQUIVOCALLY BINDS THE PROPOSER TO THE TERMS OF ITS OFFER. City of Sunny Isles Beach � Invitation to Bid No. 20-09-01 of SUN'H- l< SilNNY �S�F s O 40 a 0 C� i P y Ir Fc99)� � /rY OF SUN P� City of Sunny Isles Beach � Invitation to Bid No. 20-09-01 OµMY 4r s OF I„ NON -COLLUSION AFFIDAVIT City of Sunny Isles Beach _p`o* t 19010 Collins Avenue 9 fl-0Sunny Isles Beach, FL 33160 cftr oF sot Telephone: (305) 947-0606 Fax (305) 949-3143 STATE OF FLORIDA , COUNTY OF Dad e ) The undersigned being first duly sworn as provided by laW, deposes, and says: This Affidavit is made with the knowledge and Intent Thal it is to be filed with the Cily of Sunny Isles Beach Clty Commission and that it will be relied upon by said County, in any consideration which may give to and any action It may lake with respect to this Bid. The undersigned is authorized to make this Affidavit on behalf o(, (,^5; r(1cooI, .zaiG me of Corporation, Pannership, Individual, etc.) a, COY.�IOI'�L 6 f eh , formed under the laws of F/.-( d't' gype of Business) (State) o(which he is rre Pli�ISP ✓i/ (Sole Owner, Partner, President, etc.) Neither the undersigned nor any person, firm, or corporation named in above Paragraph 10.2, nor anyone else This Bid is genuine and not collusive or a sham; the person, to the knowledge of the undersignedI have Themselves solicited or employed anyone else to solicit favofable action for this Bid by the Cily, also that no head of any department or employee Therein, or any officer of the City of Sunny Isles Beach, Florida Is directly Interested (herein. firm or corporation named above in Paragraph 10.2 has not colluded, conspired, connived or agreed directly or Indirectly with any proposers or person, frm or corporation, to put in a sham Bid, or that such person, firm or corporation, shall refrain from Bidding, and has not in any manner, directly or indirectly, sought by agreement of collusion, or communication or conference with any person, firm or corporation, to fix the prices of said Bid or Bids of any other proposers; and all statements contained in the Bid or Bids described above true; and further; neither the undersigned, nor the person, Firm or corporation named above in Paragraph 10.2, has directly or indirectly submitted said Bid or the contents thereof, or divulged information or data relative thereto, to any association or to any member or agent thereof. / �vwtber�0 �ri'�? �fc�5,'C�v�� �✓� AFFIANT'S NAME AFFIANT'S TITLE 41 TAKEN, SWORN AND SUBS (BED TO BEFORE ME this � ay of / V �4 T/, / , 20-- Personally Known (r//or Produced Identification Type of Identification �— (Affix seal here) NOTARt2MDLLG;tlha1ne printed or typed) r7V OW Sydney yPublic Horror Stale of Florida a� Sydney Hartera y a My Commission 00545075 qa Cdr Expires 1010411025 escreieea 29, 2010 1 of 8 0 4�NNr is, `7 PUBLIC ENTITY CRIMES e City of Sunny Isles Beach 16070 Collins Avenue Sunny Isles Beach, FL 33160 or iTelephone: (305) 947-0606 Fac (305) 949-3113 SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a) FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES PUBLIC ENTITY CRIMES Pursuant to the provisions of paragraph (2) (a) of Section 287.133, Florida State Statutes - "A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a Bid on a Contract to provide any goods or services to a public entity, may not submit a Bid on a Contract with a public entity for the construction or repair of a public building or public Work, may not submit Bids on leases of real property to a public entity, may not be awarded to perform Work as a Contractor, supplier, Sub"Contractor, or Consultant under a Contract with any public entity, and may not transact business with any public entity in excess of the threshold amount Category Two of Sec. 287.017, FS for thirty six months from the date of being placed on the convicted vendor list". THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY P BLIC OR Ofif� OFFICIAL AUTHORIZED TO ADMINISTER OATHS, r 11.1. This sworn statement is/submitted to Cit of SunnyIsles Beach ('`—' by 49 for whose business address is:2y lS �� yj �O y f �n � and (if applicable) its Federal Employer Identification number (FEIN) is ��' ri6�D'O ¢i (If the entity had no FEIN, include the Social Security Number of the individual signing this sworn statement: 11.2. I understand that a "public entity crime" as defined in Paragraph 287.133(1)(g), Florida Statutes, means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or with the United States, including, but not limited to, any Bid or Contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation. 11.3. I understand that "convicted" or "conviction" as defined in Para. 287.133(1)(b), Florida Statutes, means a finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trail court of record relating to charges brought by indictment or information after July 1, 1989, as a result of a jury verdict, non -jury trial, or entry of a plea of guilty or nolo contendere. 11.4. I understand that an "affiliate" as defined in Para. 287.133(1)(a), Florida Statutes, means: a.) predecessor or successor of a person convicted of a public entity crime; or b.) Any entity under the control of any natural person who is active in the management of the entity and who has been convicted of a public entity crime. The term "affiliate" includes those officers, directorsI executors, partners, shareholders, employees, members, and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair oeceNaen ze, 2910 2 of 8 market value under an arm's length agreement, shall be a prime facie case that one person controls another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall be considered an affiliate. 11.5. 1 understand that a "person" as defined in Para. 287.133(1)(e), Florida Statutes, means any natural person or entity organized under the laws of any state or of the United States with the legal power to enter into a binding Contract and which Bids or applies to Bid on Contracts for the provision of goods or services let by a public entity, or which otherwise transacts or applies to transact business with a public entity. The term "persons" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in management of any entity. 11.6. Based on information and belief, the statement which I have marked below is true in relation to the entity submitting this sworn statement. (Indicate which statement applies.) Neither the entity submitting this sworn statement, nor any of it's officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, nor any affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. The entity submitting this sworn statement, or one or more of its offcers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. However, there has been a subsequent proceeding before a Hearing Officer of the State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer of the State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer determined that it was not in the public interest to place the entity submitting this sworn statement on the convicted vendor list. (Attach a copy of the final order.) I UNDERSTAND THAT THE SUBMISSION OF THIS PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 11.1 (O FORM TO THE CONTRACTING OFFICER FOR THE THAT THIS FORM IS VALID THROUGH DECEMBER ALSO UNDERSTAND THAT I AM REO�(IRED TO INF( A CONTRACT IN EXCESS OF THE IVRESH� { STATUTES, FOR CATEGORY TWO OF //AfJJJY, CH GE By: JE) ABOVE IS FOR THAT PUBLIC ENTITY ONLY AND, 1 OF6HE CALENDAR YEAR IN WHICH IT IS FILED, I RM1#}E PUBLIC ENTITY PRIOR TO ENTERING INTO MO N PROVIDED IN SECTION 287.017, FLORIDA IN INFORMATION CONTAINED IN THIS FORM. (signa[ure�7 n ,( (Printed Name) (Title) G� R9 and subscribed before me this � day of— , 20 U), by AA(AFFIX NOT7)YSPbimy' bim d Fra Signature: OG 3073oY3Personally KOR Produced Identification 3 of VNNvIse ' f E EQUAL OPPORTUNITY / AFFIRMATIVE ACTION City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone'(305) 947-0606 Fax. (305) 949-3113 EQUAL OPPORTUNITY/AFFIRMATIVE ACTION STATEMENT The contractors and all subcontractors hereby agree to a commitment to the principles and practices of equal opportunity in employment and to comply with the letter and spirit of federal, state, and local laws and regulations prohibiting discrimination based on race, color, religion, national region, sex, age, handicap, marital status, and political affiliation or belief. / Signed: l� vcf� E f / Title: ,1 //I/cp5i Gle of t 7 A Firm: /11f CD Address: 2�/S i?4 �iO 5� Uarif waled , �L 330/6 NECFMBER 20, 2010 4 Of B uNNY ISt� CONFLICT OF INTEREST City of Sunny Isles Beach 78070 Collins Avenue Fto Sunny Isles Beach, Fl. 33160 oF suk, 0 Telephone; (305) 947-0606 Fax: (305)949-3113 CONFLICT OF INTEREST STATEMENT The award of any contract hereunder is subject to the provisions of Chapter 112, Florida St4e Statutes. Propo s must disclose with their Bids, the name of any officer, director, partner, associate or agent who is els an offi r or em to a of the City of Sunny Isles Beach or its agencies. STATE OF FLORIDA f COUNTY OF OU de BEFORE ME, the undersigned authority, personally appeared N, et f/ Arhoi , who was duly sworn, deposes, and states: 18.1. 1 am the 'dJ J re % &so#* of N5�;'4940 G, c with a local office in X4 iA4*1i G' and principal office in dfte4G 18.2. The above named entity is submitting a Bid for the Cily of Sunny Isles Beach, Bid No. 10 'D�%�D � described as: Golden Shores Street Lighting. The Affiant has made diligent inquiry and provides the information contained in this Affidavit based upon his own knowledge. 18,3 The Affiant states that only one submittal for the above Bid is being submitted and that the above named entity has no financial interest in other entities submitting Bids For the same project. 18.4 Neither the Affiant nor the above named entity has directly or indirectly entered into any agreement, part icipated in anI collusion, or otherwise taken any action in restraints of free competitive pricing in connection with the entity's submittal for the above Bid. This statement restricts the discussion of pricing data until the completion of negotiations if necessary and execution of the Contract for this project. 16.5 Neither the entity nor its affiliates, nor any one associated with them, is presently suspended or otherwise ineligible from participation in contract letting by any local, State, or Federal Agency. 18.6 Neither the entity, nor its affiliates, nor any one associated with them have any potential conflict of interest due to any other clients, contracts, or property interests for this project. 1811 certify that no member of the entity's ownership or management is presently applying for any employee position or actively seeking an elected position with the City of Sunny Isles Beach. 18.81 certify that no member of the entity's ownership or management, or staff has a vested interest in any aspect of the City of Sunny Isles Beach. 18.9 In the event that a conflict of interest is identified in the provision of services, I, on behalf of the above named entity, will immediately otify thp City of Sunny Isles Beach. D dt s /Z�G day ofMhlbgt�,20220. A Pri t rTypeName,and—/�itlel,-. (�T S rn to and subscribed before me this edlay of f/ "VK/ 2020. Personally Known OR O Produced Identification ; Type of Identification NOTARY PUBLIC STATE OF FLORIDA „sem eW- Notary Public Slate of FIarIUa i V Sydney Herrera p My Commission 00313073 nt nP Expires 1010412023 8, 2010 5 of8 sJNNv st, s o° °a DISPUTE DISCLOSURE City of Sunny Isles Beach 18070 Collins Avenue FLO Sunny Isles Beach, FL 33160 OF surt F Tesphone:(305) 947-0606 Fax: (305)949-3113 DISPUTE DISCLOSURE FORM Answer the following questions by placing a "X" after "Yes" or . If you answer "Yes", please explain in the space provided, or on a separate sheet attached to this form. 19.1. Has your Flrm or any of its offcers, received a reprimand of any nature or been suspended by the Department of Professional Regulations or any other regulatory agency or professional associations within the last five (5) years? YES NO 19.2. Has your firm, or any member of your firm, been declared in default, terminated or removed from a contract or job related to the services your firm provides in the regular course of business within the last five (5) years? y YES NO �\ 19.3. Has your firm had against it or filed any requests for equitable adjustment, contract claims, Bid protests, or litigation in the past five (5) years that is related to the services your firm provides in the regular course of business? YES NO � If yes, state the nature of the request for equitable adjustment, contract claim, litigation, or protest, and state a brief description of the case, the outcome or status of the suit and the monetary amounts of extended contract time involved. I hereby certify that all statements made are true and agree and understand that any misstatement or misrepresentation of falsification of facts shall be cause for forfeiture of rights for further consideration of this Bid for the City of Sunny Isles Beach. %'.r.IHc /1151; DZD Date llpw6e' % D,-�i Print or Type Name and Title oecemaER ze, zo16 6 of 8 STATE OF FLORIDA ) COUNTY OF AjE ) ANTI -KICKBACK City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone:(305) 947-0606 Fax: (305) 949-3113 ANTI -KICKBACK AFFIDAVIT I, the undersigned, hereby duly sworn and deposed say that no portion of this sum herein Bid will be paid to any employees of the City of Sunny Isles Beach or its elected officials as a commission, kickback, reward or gift, directly or indirectly by me or any me4,0),frm or y an officer of the corporation.By: Title: / de'e�t foregoing instrument wa '�f_, 20-101 by. executed]. AFFIX NOTARY STAMP HERE: �.V^� Nalsry Pu0lic Style of Florida Sytlney Herrera Commis 43073 "•oia� Ex Espues 1010/120234/2023 G, s ac we ed before me this day of e�'?P7fz [name [type of authority], for [name of party on behalf of whom instrument was ary is — State of Florida Print Type Commissioned Name Personally Known c/ OR Produced Identification Type of Identification Produced oeca�een za, zoto 7 of 8 CONTRACTOR ANTI -BOYCOTT CERTIFICATION °""" [PURSUANT TO FLORIDA STATUTE § 215A7251 I, yijyr�El�rU //al, on behalf of Print Name Company Name certifies that AUf 4: t1.4077 //04 G does not: Company Name 1. Participate in a boycott of Israel; and 2. Is not on the Scrutinized Companies that Boycott Israel list; and 3. Is not on the Scrutinized Companies with Activities in Sudan List; and 4. Is not on the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List; and 5. Has not engaged in business operations in Cuba or Syria. Y ��GlidliN Title Date STATE OF FLORIDA COUNTY OF Miami -Dade 1 BID BOND City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 sphere: (305) 947-0606 Fax: (305) 949-3113 KNOW ALL MEN BY THESE PRESENTS, that we, AUM Construction, Inc. as Principal, and Contractors Bonding and Insurance Company , as Surety, are held and firmly bound unto the City of Sunny Isles Beach, a municipal corporation of the State of Florida in the sum of Five Percent of Bid Amount Dollars ($ 5% of Bid ), lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators and successors jointly and severally, firmly by these presents. CONDITION OF THIS OBLIGATION IS SUCH that whereas the Principal has submitted the accompanying Bid dated, ober 10th 2020 for: WHEREAS, it was a condition precedent to the submission of said Bid that a cashiers check or Bid Bond in the amount of five percent (5%) of the Base Bid be submitted with said Bid as a guarantee that the Proposers would, if awarded the Contract, enter into a written Contract with the City for the performance of said Contract, within ten If 0) consecutive calendar days after written notice having been given of the Award of the Contract. NOW, THEREFORE, the conditions of this obligation are such that if the Principal within ten (10) consecutive calendar days after written notice of such acceptance, enters into a written Contract with the City of Sunny Isles Beach and furnishes the Performance Bond, satisfactory to the City, each in an amount equal to one hundred percent (100%) of the Contract Price, and provides all required Certificates of Insurance, then this obligation shall be void; otherwise the sum herein stated shall be due and payable to the City of Sunny Isles Beach and the Surety herein agrees to pay said sum immediately, upon demand of the City, in good and lawful money of the United Slates of America, as liquidated damages for failure thereof of said Principal. IN WITNESS WHEREOF, the above bonded parties have executed this instrument under their several seals this 4th day of November ,20 20 ,the name and the corporate seal of each corporate party being hereto affxed and these presents being duly signed by its undersigned representative. IN PRESENCE OF: Individual or Partnership Principal 8950 NW 119th St. Business Address Hialeah Gardens, FL 33018 City, State, and Zip Code (305)456-4848 Business Telephone CONTINUES ON NEXT PAGE rtporate Business Facsimile ATTEST: i Cynlractors Rontli�cn _antl Insurance Company Secretary t(Arporate Surety)` Tina Mangum, Attor -in-Fact `Impress Corporate Seal IMPORTANT By: Surety companies executing bonds must appear on the Treasury Department's most current list (circular 570 as amendetl) and be authorized to transact business in the Stale of Florida. DECEMBEa28, 2010 1["OWER OF ATTORNEY RLI Insurance Company Contractors Bonding and Insurance Company 9025 N. Lindbergh Dr. Peoria, IL 61615 Phone: 800-645-2402 Know All Men by Tbese Presents: That this Power of Attomey is not valid or in effect unless attached to the on which it authorizes executed, but may be detached by the approving officer if desired. That RLI Insurance Company and/or Contractors Bonding and Insurance Company, each an Illinois corporation, (separately and together,. the "Company") do hereby make, constitute and appoint: Dirk D. DeJong. Tina Mangum, Janet P. Colandrea, Sharon Myers. jointly or severally in the City of Pompano Beach ,State of Florida its true and lawful Agents) and Attorneys) in Fact, with full power and authority hereby conferred, to sign, execute, acknowledge and deliver for and on its behalf as Surety, in general, any and all bonds and undertakings in an amount not to exceed Twenty Five Million Dollars ( $25.000.000900 ) for any single obligation. The acknowledgment and execution of such bond by the said Attorney in Fact shall be as binding upon the Company as if such bond had been executed and acknowledged by the regularly elected officers of the Company. RLI Insurance Company and/or Contractors Bonding and Insurance Company, as applicable, have each further certifed that the following is a true and exact copy of a Resolution adopted by the Board of Directors of each such corporation, and is now in force, to -wit: "All bonds, policies, undertakings,. Powers of Att orney or other obligations of the corporation shall be executed in the corporate name of the Company by the President, Secretary, any Assistant Secretary, Treasurer, or any Vice President, or by such other officers as the Board of Directors may authorize. The President, any Vice President, Secretary, any Assistant Secretary, or the Treasurer may appoint Attorneys in Fact or Agents who shall have authority to issue bonds, policies or undertakings in the name of the Company. The corporate seal is not necessary for the validity of any bonds, policies, undertakings, Powers of Attorney or other obligations of the corporation. The signature of any such officer and the corporate seal may be printed by facsimile." IN WITNESS WHEREOF, the RLI Insurance Company and/or Contractors Bonding and Insurance Company, as applicable, have caused these presents to be executed by its respective Vice President with its corporate seal affixed this 22nd day of June 2020 RLI Insurance Company ,.Oa��ryGANO N � • %t%0WCE cp�Contractors Bonding and Insurance Company 03too 9: OPPOH41': J PPOMT •••7I•: H/ T "z,SEAL,:, ': SEAL By: yu•, ' ; ' Barton W. Davis Vice President to lotState of Illinois - ;�11NO;', %110 two :;�INO„`yo•` SS County of Peoria CERTIFICATE On this 22nd day of lune , 2020, before me, a Notary Public, personally appeared Barton W Davis ,who being by me duly sworn , acknowledged that he signed the above Power of Attomey as the aforesaid officer of the RLI Insurance Company and/or Contractors Bonding and Insurance Company and acknowledged said instrument to be thevoluntary act and deed of said corporation. Catherine D. Glover Notary Public GLOVER CATHERINE D. OFfICIALBEAL ttrior Notary PWlb-Srw of llKnoY 0 OnmtnutbF Mercn 21 9024LI I, the undersigned officer of RLI Insurance Company and/or Contractors Bonding and Insurance Companydo hereby certify , that the attached Power of Attomey is in full force and effect and is irrevocable; and furthermore,. that the Resolution of the Company as sal forth in the Power of Attorney, is now in force. In testimony whereof, I have hereunto set my hand and the. seal of the RLI Insurance Company and/or Contrac ors Bonding and Insurance Companythis 4rh day of at go . RLI Insurance Company Contractors Bonding and Insurance Company By: ��•I�a i'►� Jeffrey is Corporate Secretary �ru4rasaars A0058DI9 QUALIFICATION REQUEST No, 3 Previous Similar Public Bids: 1- T4468, eroward County a- Contractor's Project Manager: Javier Chang b- Project Name: SR -848 (Stirling Road) @ 1-95 Street Lighting c- Owner: FDOT District 4, 5548 NW 9 Ave Fort Lauderdale, FL 33309 d- Address: SR-848(Stirling Road) @ 1-95 e- Contact Person: Timothy Butler, Phone No. 954-958-7646 f- Contract Amount: $ 199,400.00 g- Date of Completion:8/16/2018 h- Description of Work: The improvements under this contract consisted of roadway lighting installation and maintenance along SR 848. (Sterling Rd) 2- T6453, Miami Dade a- Contractor's Project Manager: Roberto Anca. b- Project Name: SR 7 (NW 7 Ave) from SW 6 St to NW 62 St Street Lighting c- Owner: FOOT District 6, 1000 NW 111 Ave Miami, FL 33172 d- Address: SR 7 (NW 7 Ave) from SW 6 St to NW 62 St e- Contact Person: Dru Badri, Phone No. 305-401-1560 f- Contract Amount: $ 242,600.50 g- Date of Completion: 4/5/2019 h- Description of Work: The improvements under this contract consisted of roadway lighting installation and maintenance along SR 7. (NW 7 Ave) 3- T6459, Miami Dade a- Contractor's Project Manager: Javier Chang. b- Project Name: Street Lighting Improvements at SR 7 (NW 7 AVE) FROM NW 63 ST TO NW 215 ST, SR 933 FROM NW 20 ST TO NW 33 ST AND SR 5 FROM NE 123 ST TO NE 213 ST c- Owner: FDOT District 6, 1000 NW 111 Ave Miami, FL 33172 d- Address: SR 7 (NW 7 AVE) FROM NW 63 ST TO NW 215 ST, SR 933 FROM NW 20 ST TO NW 33 ST AND SR 5 FROM NE 123 ST TO NE 213 ST e- Contact Person: Omar Mendoza, Phone No. 305-456-4848 f- Contract Amount: $ 11799.799.00 g- Date of Completion: 2/15/2020 h- The improvements under this contract consist of Pedestrian Lighting Retrofits at the signalized intersections along SR 7, SR 933 and SR 5 )§ 7 ! kk §) jM- % § `\\ ~5 E ` k% ---®--_l , ,---®- - ®- w� w� \\\\ §} `� k 0\ !] w _ k \ > § \ ` ) - \\\\ \ƒ /§�\ -\ \°2=§2;;e 22§! §j ® /( `E ° \ ` (` Ofcc ( ()/\ § z # �a 2w \\ } \ \\}\ 0 , z- [k ` /!\( �\§;# - 2 2§-§�- \)\j) w \\\\\ � 0 N NN U5 in 05 u \\\\/ AUM has never been late on a project nor have we ever had any Liquidated Damages imposed on any of our contracts. AUM is uniquely qualified to not only execute this contract but also assure the City that we will expedite the installation at no additional cost. In conjunction with City staff, we will jointly develop our proposed construction schedule that will minimize the impacts to the residents. As evidenced by our list of most recent similar projects, AUM has extensive experience in the installation of street lighting. We have dedicated specialty crews for the undergrounding, light pole base installation and the erection and wiring of the light poles. This methodology allows us to develop a highly efficient progression of work. In 2019, we were working concurrently on 3 different multi- million -dollar street lighting projects for FDOT throughout Miami -Dade County. The experience and ability of our field crews allowed us to successfully finish each project on time and under budget. No. 14 Submitter's attributes: As previously stated, AUM is highly qualified to execute this contract. Besides the multiple similar construction projects that we have completed for other agencies, AUM is the Street Lighting Maintenance Contractor for Miami -Dade County Transit & Public Works Department for all +13,000 street lights on County and FDOT maintained roadways north of NW 36 ST to the County Line, including Miami Beach, Surfside, Sunny Isles Beach, Golden Beach and Key Biscayne. AUM is ready and able to provide the City of Sunny Isles our expertise in the proposed scope of work that is required for 'this contract. LICENSES D im LL O Q w Q w cn ® Z H m j C7 o Q w Z LL N J � I- fii pUo w ��tit l� _ H wco�l,i3l�y�y 'W LJ U Q 11G l LL J Q a z V U O V � � W w a J w W I � O w D M ZZr") O w J < LL U U �Qw` Z J n z aL N PFAD Q n N N O N M F N UILL waj Q z 0 a WO V v C: v U J 0 c O CD E LOMM 0 7C) O _ c u v U O v w o V H r v W Q 0�ED Lu (n O o � Fmm Z u Q Z w J' o� c� O v E � N N Q GG�11�11; o M o Q �_ LL W w ���Ce) CD �I V M 04 Ln lk� m O VLn �j ;,,; O0 LL OF -w �'� o S o J ov USN U,= v LL 'w d ill 1, W .w w la m u o O Z N = W Z ;: m Ilw- c '� c W Q 0 O n~ 0�0 0 o L F- N Z Q uw IZ;Z '� Q W U T G LLJ O —°+' o F- Z Z� u = j J N �z'1Q- u N Q z 0 N d Q u'c 3 DF ® _ a v O mU J O =J W 7 LL O �® 3 F= H w - _ Q v `o Z N w 0 c E W U u o Ow _ N F u � 0 O C i Ul Q •� a Q N p W a Q wm�m Fg ADDENDUM ii 1 DATE: Thursday, October 29, 2020 TO: ALL PLANHOLDERS FROM: Purchasing Administrator BID NO.: ITB 20-09-01 Golden Shores Street Lighting Bid SUBJECT: Addendum No. 1 BID SUBMITTAL DEADLINE: Tuesday, November 10, 2020 at 2:30 PM Please attach this addendum to the documents in your possession and include the Acknowledgement of Addenda form with your response incorporated with the Invitation to Bid. Revisions: (Note: Deletions will be indicated by s#ikethF9wgh additions will be indicated with bold font): Q1. Will the city accept alternatives to the Holophane Esplanade Teardrop if the specs are matched equivalently? Al. Alternatives will be reviewed as part of the Value Engineering separate submittal, within the sealed bid. Q2. Can you please provide the estimated completion time and contract price for the Golden Shores Street Lighting project. A2. Regarding the budget please refer to the meeting minutes below. The project duration will be established as a function of bid analysis and availability of material. Q3. In order to analyze value engineering proposals for the city, please provide the proposed cross section for undergrounding the existing utilities within the project limits detailing the conduits' sizing & cover for each of the utilities. In addition, please also indicate the offset from the centerline or edge of pavement for this proposed undergrounding within the project limits. Also, please indicate the proposed spacing for manholes/pull boxes/etc. For each of the utilities that will be undergrounded. A3. The future undergrounding and consequences of same are immaterial to the street lighting project. Follow the plans as presented for bidding. Q4. Can multiple value engineering proposals be presented? W. Yes, value engineering is explained more below as part of the attachments, however yes multiple value engineering suggestions are welcomed. QS. Please indicate the duration of the contract and if liquidated damages are applicable. A5. No Liquidated Damages are anticipated as a part of this contract. The project duration will be established as a function of bid analysis and availability of material. However, time is of the essence and a 100% performance & payment bond is required at the time of award. 16. The specification shows a non -cut-off luminaire with a teardrop globe. This unit's light distribution and performance combine the light source output with the prismatic globe lens distribution. Most municipalities and communities are reducing glare and light pollution using full cut-off units. Removing the glass globe and using a flat glass reduces glare and light pollution in residential areas and eliminates breakage and replacement of lenses in hurricane -prone coastal locations. ***Should the specification aHow cut-off units or be modified to carry the most current practices and features? revisions A6. Bid the plans. If appropriate, suggest as a Value Engineering item. Q7. We noticed that photometric calculations are part of the bid documents, but there seem to be some uniformity issues. For example, some locations do not show any results; for instance, at the intersections, usually one of the most critical areas. *What are precisely the criteria for the light design? Average foot-candles, Uniformity ratios, and what is the reference used. FDOT Greenbook or IES best practices? A7. Bid the plans as published, technical issues regarding this subject will be addressed following the award. Also, neither FDOT Greenbook or IES best practices, follow industry standard. Q8. Can you confirm if this project has received some federal funding? A8. No federal funds involved. Revisions: PLEASE Attached PRICES FURNISHED & INSTALLE^, ' �`���, PROVIDED TO CITY OF you will find the revisions including the Bid Form, as well as the meeting minutes and siqn-in sheet. R1. Section 3.2 (1.1): This contract comprises of work described in accordance with plans and specifications entitled: Golden Shores Street Lighting, Sunny Isles Beach, Florida, dated September 11, 2020, including sheets E-0 through E 36 E-37 and Project Specifications included as Exhibit W. R2. Section 4: PLEASE QUOTE PRICES FURNISHED & INSTALLE^, ' �`���, PROVIDED TO CITY OF SUNNY ISLES BEACH, FLORIDA. R3. Bid Form: 03 REMOVE EXISTING LIGHT POLE EA 48 -Revised to 32. R4. ITB Page 35 Table of Contents: DIVISION 16 - ELECTRICAL 1 N9 -T USED) ADDENDUM # 2 DATE: Monday, November 09, 2020 TO: ALL PLANHOLDERS FROM: Purchasing Administrator BID NO.: ITB 20-09-01 Golden Shores Street Lighting Bid SUBJECT: Addendum No. 2 BID SUBMITTAL DEADLINE: Tuesday, ni,.,,,,., beF 10 2020 t 2:30 nne Monday, November 16, 2020 at 10:00 AM Please attach this addendum to the documents in your possession and include the Acknowledgement of Addenda form with your response incorporated with the Invitation to Bid. Revisions: (Note: Deletions will be indicated by ��, additions will be indicated with bold font): R1. Due to Tropical Storm Eta, the bid opening has been extended to Monday, November 16, 2020 at 10:00 AM. 1 ADDENDUM # 3 DATE: Tuesday, November 10, 2020 TO: ALL PLANHOLDERS FROM: Purchasing Administrator BID NO.: ITB 20-09-01 Golden Shores Street Lighting Bid SUBJECT: Addendum No. 3 BID SUBMITTAL DEADLINE: Tuesday, Pley.,, beF 10 2020 ,t 2.00 0nn nn...,day, nin,,,,.,, ber 16 2920 at 10.00 AM Tuesday, November 17, 2020 at 2:30 PM Please attach this addendum to the documents in your possession and include the Acknowledgement of Addenda form with your response incorporated with the Invitation to Bid. Revisions: (Note: Deletions will be indicated by '�s�lgb, additions will be indicated with bold font): R1. Due to Tropical Storm Eta, the bid opening has been extended to Tuesday, November 17, 2020 at 2:30 PM. R2. Addendum # 1 Bid Form, Item # 17: Include authorized signer's name and signature. FI