Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
EAC Consulting, Inc.
NOVEMBER 20, 2020 • ORIGINAL EAC Consulting, Inc. eacconsult.com CITY OF SUNNY ISLES BEACH RFQ NO. 20-10-01 • PROFESSIONAL ENGINEERING AND ARCHITECTURAL SERVICES FOR PEDESTRIAN BRIDGE WITH PARK ELEMENTS ACROSS A1A AT 174TH ST. CCNA A A. TITLE PAGETITLE PAGE RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA TITLE PAGE RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA Respondent Firm: EAC Consulting, Inc. Address: 5959 Blue Lagoon Drive, Suite 410 Miami, FL 33126 Phone Number: (305) 265-5400 Contact Persons: Harold Desdunes, PE – Principal-in-Charge hdesdunes@eacconsult.com K.T. Lin, PE, PhD. – Project Manager klin@eacconsult.com Date: November 20, 2020 B. TABLE OF CONTENTSb TABLE OF CONTENTS 4 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA TABLE OF CONTENTS A: Title Page B: Table of Contents C: Cover Letter and Executive Summary D: Project Approach and Understanding E: Qualification Information and Assigned Personnel F: Firm References and Similar Work Completed G: Corporate Standing and Authorized Signatory H: Variations/Exceptions I: Litigation Statement J: Forms and Attachments C. COVER LETTER AND EXECUTIVE SUMMARYCOVER LETTER AND EXECUTIVE SUMMARYc 5959 Blue Lagoon Drive • Suite 410 • Miami, FL 33126 • 305.265.5400 • eacconsult.com November 20, 2020 Attn: City Clerk City of Sunny Isles Beach 18070 Collins Avenue, 4th Floor Sunny Isles Beach, Florida 33160 Re: RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th Street – CCNA Dear Selection Committee: We congratulate the City of Sunny Isles Beach for a strong sense of community and safety as it pursues its vision to engage and enhance the community’s quality of life. The Sunny Isles Beach of the future is a community with high mobility and accessibility to neighborhood amenities for its residents, a place where the movement of local and regional people and goods is provided by street, water, transit, pedestrian, and bicycle systems that are complete and fully integrated. EAC Consulting, Inc. (EAC) has assembled a team that includes world renown bridge and landscape architects to achieve the City’s vision for this visionary project to provide a Pedestrian Bridge with Park Elements across A1A at 174th Street. Understanding of Scope of Work EAC is fully aware of the importance of this project to the City, and to the potential improvement of pedestrian mobility in the community. The project’s purpose is to provide safe pedestrian and bicycle access over Collins Avenue at 174th Street. There is currently a need for pedestrians and cyclists to safely and conveniently cross Collins Avenue to access the Gilbert Samson Oceanfront Park, the beach, and numerous retail shops on the west side of Collins Avenue. EAC is a FDOT-quali ed rm that specializes in bridge design . Our team has the professional engineering and architectural expertise for the proposed pedestrian bridge. This bridge will be designed DVDQHOHYDWHGSDUNZLWKDWWUDFWLYHODQGVFDSLQJIHDWXUHVDQGDVDIHSHGHVWULDQSDWKZD\7KH($&7HDPLVXQLTXHO\TXDOLÀHGWR VXFFHVVIXOO\FRPSOHWHWKLVSURMHFW6RPHRIWKHXQLTXHTXDOLÀFDWLRQVRIWKH($&7HDPDUH 1.EAC understands the requirements of FDOT’s Local Agency Program (LAP) Manual as it relates to projects such as this - that involve a bridge structure crossing a roadway. We will comply with FDOT’s latest revisions to the LAP Manual and the Florida Design Manual for these bridges. 2.($&KDVLQFOXGHGD3HHU5HYLHZÀUPRQRXUWHDPWKDWZLOOUHYLHZQRWRQO\WKHGHVLJQRIWKHEULGJHEXWDOVRWKHFRQVWUXFWLRQ sequence. 3.EAC has a proven reputation for providing notable bridge structures, including pedestrian bridges. In 2019, EAC successfully completed the design of the Award Winning pedestrian bridges for Hard Rock Stadium as part of a design build contract. 4.EAC’s commitment to public safety will result in a successful project. 5.EAC’s Structural Design Team, led by Dr. KT Lin, PE, PhD is located in Miami within minutes of the project. Our Commitment to RFQ No. 20-10-01 EAC is committed to the practice of engineering, as well as to maintaining excellence in the quality of our services. We pledge and commit to perform the proposed scope of work for RFQ No. 20-10-01 in accordance with the terms of the response being submitted. Our team is ready and available to immediately start work. We have reviewed the scope of services for this project and have selected C C-1 D3URMHFW7HDPWRHQVXUHWKDWWKH&LW\RI6XQQ\,VOHV%HDFKLVSURYLGHGZLWKWKHUHTXLUHGTXDOLÀHGVNLOOVWRHIIHFWLYHO\FRPSOHWHDOOWKH services called for in this RFQ. Our High-Performance Full-Service Team •Project Management, Structures, Civil, Lighting and Construction Management Engineering Services - EAC Consulting, Inc. •Architectural and Landscape Architectural Services - Savino and Miller Design Studio •Architectural and Landscape Architectural Services - West 8 Urban Design & Landscape Architecture P.C. Corp •Structural Engineering Support Services - ASA Consultants, Inc. •Bridge Inspection Services - LARS Engineering, Inc. •7UDIÀF(QJLQHHULQJ6HUYLFHVChoice Engineering Consultants, Inc. •Surveying Services - Manny G. Vera & Associates, Inc. •Soil Exploration, Material Testing and Foundations - Geosol, Inc. •Environmental and Irrigation Services - Smart-Sciences, Inc. •Cultural Resource Services - Janus Research •MEP Engineering Services - TLC Engineering Solutions •Public Involvement - GlobComm, LLC EAC’s Experience ($&KDVVLJQLÀFDQWH[SHULHQFHLQSHGHVWULDQEULGJHGHVLJQLQFOXGLQJVRPHUHFHQWSURMHFWVLQ0LDPL'DGHDQG%URZDUGFRXQWLHVWKH Hard Rock Stadium Pedestrian Bridges, in the City of Miami Gardens; the Snake Creek Pedestrian Bridge, in the City of North Miami %HDFKDQGWKH1:VW6WUHHW$YHQXH3HGHVWULDQ%ULGJH2YHU&&DQDOLQ2DNODQG3DUN($&VDWLVÀHGWKHQHHGVRIDOOWKHFLWLHV listed, and met the budget and schedule requirements of each project. Planned Project Approach ($&·V0LDPLRIÀFHORFDWHGDW%OXH/DJRRQ'ULYH6XLWH0LDPL)/ZLOOEHUHVSRQVLEOHIRUWKLVFRQWUDFW Harold Desdunes, PE (hdesdunes@eacconsult.com), former FDOT District 6 Director, will serve as the Principal-in-Charge for this project. Kuo Ting “K.T.” Lin, PE, PhD, (klin@eacconsult.com) will serve as the Project Manager, with Stephanie Romero, PE (sromero@eacconsult. com) serving as Deputy Project Manager. We can be reached at (305)265-5400. EAC’s reputation was built on projects requiring the satisfaction of our clients’ needs through: Effective Client Service; Innovative Engineering and Solutions; Budget and Schedule Control; and the Provision of Quality Services. About EAC EAC was founded 26 years ago as a full-service multi-disciplined enginHHULQJÀUPWKDWSURYLGHVJRYHUQPHQWDODJHQFLHVZLWKFRQVXOWLQJ VHUYLFHV5HFRJQL]HGDVRQHRI0LDPL'DGH&RXQW\·VFRQVXOWLQJHQJLQHHULQJ·VVXFFHVVVWRULHVRXUÀUP·VRYHUDOOFRPPLWPHQWWRWKH engineering practice has resulted in outstanding growth. EAC offers a wide variety of engineering services - including planning, design DQGFRQVWUXFWLRQDGPLQLVWUDWLRQDQGKDVWKHVSHFLÀFH[SHUWLVHUHTXLUHGIRUVXFFHVVIXOO\GHOLYHULQJWKLVSURMHFW Some of our clients include: 9 Florida Department of Transportation 9 Miami Dade County Public Works 9 Brightline (Virgin Trains) 9 City of Miami Beach 9 City of North Miami 9 City of Miami 9 City of Hallandale Beach 9 City of North Miami Beach 9 City of Ft. Lauderdale 9 Village of Palmetto Bay 9 Village of Islamorada 9 Miami Dade Water and Sewer Department 9 Miami Dade Parks and Recreation Department 5959 Blue Lagoon Drive • Suite 410 • Miami, FL 33126 • 305.265.5400 • eacconsult.com EAC Consulting, Inc. eacconsult.com 9 Miami Dade Department of Environmental Resource Management 9 Miami Dade Aviation Department 9 Miami Dade County Housing Agency 9 Miami Dade County Public Schools 9 Broward County Public Works Department 9 Broward County Water and Wastewater Services 9 Broward County Parks & Recreation Department 9 Broward County Aviation Department 9 Broward County Public Schools 9 South Florida Water Management District 9 Palm Beach County Public Works Department 9 Orlando Orange County Expressway Authority 9 Greater Orlando Aviation Authority C-2 GLOBCOMM EAC’s Workload EAC as the Prime Consultant, currently has an average workload. ($& KDV SURSRVHG VWDII UHVRXUFHV GHGLFDWHG VSHFLÀFDOO\ WR WKLV contract. We have similarly teamed with sub-consultants who have the availability for the required services. The adjacent table shows the availability of our Key Personnel assigned on this project, and demonstrates that our current workload will not impact this project. Our dedicated local Project Manager will be responsive, and will have additional assistance from the Deputy Project Manager. With an overall staff of 89 professionals (which includes 28 PEs, 12 EIs/ Engineers and 18 CEI personnel), the resources of EAC are more WKDQVXIÀFLHQWWRPHHWDQGH[FHHGWKHSHUIRUPDQFHUHTXLUHPHQWV on this project. EAC’s Capability to Perform Additional Work With its overall staff, EAC has more than enough staff resources to excel on this project, as well as to perform additional work resulting from this contract - upon the City’s request. Warranty 'XULQJWKHWHUPRIWKH$JUHHPHQWDOOUHTXLUHGOLFHQVHVFHUWLÀFDWLRQV and permits required under federal, state, and local laws necessary to perform the services for this contract will be kept in good standing. Name Role Project Availability K.T. Lin, PE, Ph.D.Project Manager 100% Stephanie Romero, PE Deputy Project Mgr 100% Abid Hadrous, PE Structures Design 100% Chun Li, PE Structures Design 100% Ning Wang, PE Structures Design 100% +DPLG$QDMDÀ(,3K'Structures Design 100% David Gilpin-Hudson, AICP Planner 100% Enrique “Rick” Crooks Planning 80% Dinesh Dagly, PE QA/QC 100% Jenner Alfaro, PE Constructability 100% Adriana Savino, AIA Architecture 100% Daniel Vasini, ASLA Landscape Architecture 100% Barry Miller, ASLA Landscape Architecture 100% Adriaan Geuze, AIA, ASLA Architecture & Landscape Architecture 80% Huntley Higgins, PE Civil Engineering Design 90% Satiar Shirazi, PE Roadway Design & MOT 100% Cesar Quiroz, PE Roadway Design & MOT 80% Herman Tirado, PE Drainage 100% Gisele Colbert, MS Environmental 100% Luz Urbaez Weinberg Public Involvement 100% Name Title Address Telephone No. Harold Desdunes, PE Senior Vice President/ Project Principal 5959 Blue Lagoon Drive, Suite 410, Miami, FL 33126 305-265-5400 ext. 5441 KT Lin, PE, PhD Senior Vice President/ Project Manager 305-265-5400 ext. 5412 Performance Guarantee With our Project Team’s combined expertise, we are prepared and equipped to serve the City. In summary the EAC Project Team offers the following: Long History with State, County and Municipal Clients in South Florida – Our team collectively brings a wealth of experience with clients in the State of Florida. Expertise and Experience ²2XUSURSRVHGVWDIÀQJSODQLQFOXGHVSURIHVVLRQDOVZKRKDYHZRUNHGRQVLPLODUSURMHFWVDQGWDVNV Some of these professionals have worked together collaboratively to accomplish project objectives. Strong Track Record of Performance – Our clients will attest to our performance. Up to 80% of EAC’s workload is new work opportunities from existing clients. Proven Management Leadership – Our designated Principal in Charge (Harold Desdunes, PE) and Project Manager (K.T. Lin, PE) are industry leaders that have proven their ability to manage and lead. Commitment to Safety – We will successfully complete the services in a safe manner that protects the public, complies with all governing requirements and provides the City with a bridge that requires minimal maintenance to safely provide its intended purpose. :HDUHKRSHIXOWKDWRXUVXPPDU\RITXDOLÀFDWLRQVJLYHV\RXWKHFRQÀGHQFHWRVHOHFW($&&RQVXOWLQJ,QF($&ORRNVIRUZDUGWR SURYLGLQJWKHUHTXLUHGVHUYLFHVWRWKH&LW\DQGZHDUHFRQÀGHQWWKDWZHZLOOH[FHHGWKH&LW\·VH[SHFWDWLRQVRQWKLVSURMHFW Sincerely, EAC Consulting, Inc. Harold Desdunes, PE – Principal in Charge Persons Authorized to Make Representations Our primary representatives to warrant and represent that at all times during the term of the Agreement that all required licenses, FHUWLÀFDWLRQVDQGSHUPLWVUHTXLUHGXQGHUIHGHUDOVWDWHDQGORFDOODZVQHFHVVDU\WRSHUIRUPWKHVHUYLFHVIRUWKLVFRQWUDFWDUHLQJRRG standing are: C-3 D. PROJECT APPROACH AND UNDERSTANDINGPROJECT APPROACH AND UNDERSTANDINGd 9 Former FDOT District 6 Director as Principal In Charge 9 Local Team Expertise and strong bridge sub for Peer Review 9 Experienced Design Architect 9 Local Award Winning Landscape Architecture 9 Local Agency Program (LAP) Experience and Familiarity with Federal Funding Opportunities THE EAC Consulting, Inc. eacconsult.com TEAM... HAROLD DESDUNES - PE PRINCIPAL IN CHARGE 9 Former FDOT District 6 Director Members of the Selection Committee, EAC Consulting, Inc. (EAC), with partners Savino and Miller Design Studio (SMDS) and West 8 Urban Design and Landscape Architecture Corp. (West 8) - and in association with specialty sub-consultants - are herein submitting our qualifications for the Professional Engineering and Architectural Services RFQ for the Pedestrian Bridge with Park Elements across A1A at 174th Street and Collins Avenue. We have assembled a project team with the required experience, expertise, and approach to successfully deliver this pedestrian bridge park project. Some of the unique qualifications of the EAC Team assembled for this project are: 1. EAC understands the requirements of the FDOT’s Local Agency Program (LAP) Manual as it relates to projects such as this - that involve a bridge structure crossing a roadway. We will comply with the FDOT’s latest revisions to the LAP Manual and the Florida Design Manual for these bridges. 2. EAC has included a peer review firm on our team that will review not only the design of the bridge, but also the construction sequence. 3. EAC has a proven reputation for providing notable bridge structures, including pedestrian bridges. In 2019, EAC successfully completed the design of the pedestrian bridges for the HardRock Stadium as part of a design-build contract. 4. EAC’s commitment to public safety will result in a successful project. 5. EAC’s Structural Design Team, led by Dr. KT Lin, PE, PhD is located in Miami within minutes of the project. EAC Consulting, Inc. eacconsult.com GLOB COMM, LLC MAKING YOUR vision A reality! 9 Local Award Winning Landscape Architecture D-11 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA DRFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA dPROPOSED ENGINEERING AND ARCHITECTURAL SERVICES EAC Consulting, Inc. (EAC), is a FDOT certified firm with the capability to provide structural and transportation design services - including pedestrian bridge design, roadway design, maintenance of traffic, lighting design, permitting, and construction engineering inspections. EAC’s bridge certifications include major steel, concrete, and concrete segmental bridges - and EAC has assembled the premier bridge engineering team in Miami-Dade County. EAC built its reputation and business by providing design services for notable bridge structures, including pedestrian bridges. EAC has recent experience in pedestrian bridge design with the Hard Rock Stadium Pedestrian Bridges in the City of Miami Gardens. The EAC Project Team is familiar with Federal Highway Administration (FHWA) and FDOT Local Agency Program (LAP) requirements. In conjunction with FDOT District 6, our Project Team has experience with federally funded projects - such as the Venetian Causeway Bridges Project Development and Environment (PD&E) Study, which is currently in its final stages. It will be our priority to perform all necessary due diligence to ensure that the objectives of the City of Sunny Isles Beach are attained. K.T. Lin, PE, PhD, heads EAC’s Structures Department, and leads our Project Team. He is a registered Florida Professional Engineer with over 35 years in bridge structure design - including pedestrian bridges. Mr. Lin’s expertise, experience, and leadership, as well as his commitment to public safety, will result in a successful project. The EAC Team has extensive experience on similar local and state projects. We have successfully delivered numerous Bridge Structural Engineering Projects for FDOT, Miami-Dade County DTPW, various ports, MDX, CFX, Broward, USACE, FTA, Miami Transit, and Virgin Train (US-FL). We have excellent project experience on major bridges and minor bridges, which are described below: HARD ROCK STADIUM PEDESTRIAN BRIDGE AND TUNNEL, CITY OF MIAMI GARDENS EAC designed the pedestrian bridges and approach ramps using a prefabricated streel truss for the design-build project. The project required an accelerated schedule to be in time for the February 2020 Super Bowl game at the Hard Rock Stadium. The design and construction were completed in one year. EAC Consulting, Inc. eacconsult.com D-12 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA D MIAMI STATION RAIL INFRASTRUCTURE AND RAIL VIADUCT, BRIGHTLINE TRAINS - FLORIDA As the Structural EOR for this signature project, EAC provided the structural design and post-design of the rail bridge structures at the Miami Station. The elevated guideway structures were designed to support Brightline trains and Tri-Rail passenger trains approximately 50-ft. above grade. The rail structures were structurally integrated within the new MiamiCentral Station facility. Florida U-beams and FIB were considered for the superstructure; FIB was selected in the final design for its economic advantages. The foundation system was based on 24-in. auger cast piles. One highlighted architectural feature of the pier consists of six inclined columns framed both transversely and longitudinally - that provides both aesthetics and open space for the station entrance. The inclined piers were post-tensioned to offset the effect of column inclination. Key design forces for the piers include gravity loads, train tracking and braking forces, as well as rail-structure interaction. GOLDEN GLADES PEDESTRIAN BRIDGE The Golden Glades Multimodal Transportation Facility (GGMTF), a design-build project for FDOT District-6, is currently under design and construction. This project is located in the southwest quadrant of the Golden Glades Interchange in northern Miami-Dade County. As the Structural EOR for this signature project, EAC provided the structural design of the pedestrian bridge that connects the proposed parking garage structure to the existing Tri-Rail Bridge. PORT OF MIAMI DODGE ISLAND SEGMENTAL BRIDGES, MIAMI-DADE COUNTY D-13 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA D Our team senior staff - including Dr. K.T. Lin, Abid Hadrous, Dinesh Dagly, Soheila Sadough, and Raul Amaya - were a major part of the original Beiswenger, Hoch, and Associates (BHA) design team. Dinesh was the Structural PM; Abid provided the segment design; Soheila provided the substructure design as well as the transverse load rating; Raul provided the longitudinal analysis and load rating; and K.T. provided QC of the longitudinal load rating of the as-built structures, as well as construction assistance of the substructure. The project received the Award of Excellence in Highway Bridge Design from the Federal Highway Administration and several architectural lighting awards. 1994 AWARD BIENNALAWARDS EXCELLENCE SR 100 (FLAGLER BEACH BRIDGE), FLAGLER COUNTY Dr. Lin designed the bridge using the concept of continuous prestressed Florida Bulb-Tee Beams. The beams were first pre-tensioned, attaining continuity thereafter by placing the closure pours and post-tensioning the whole unit longitudinally. The effect of staged construction and time-dependent factors on the structures were taken into account in the design. Palmetto Expressway Segment-2, D-14 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA D EB AND WB BRIDGES OVER 67TH AVE., FDOT-6 EAC designed the bridges using FIB for the superstructure and post-tensioned straddled pier for the substructure. Structures will be constructed in phases for MOT. We utilized refined structural analysis to model the entire structure to evaluate the effect of phased construction on the straddled pier. WEST 8 is an award-winning Florida licensed firm, with expertise in urban design and landscape architecture. The firm was founded in 1987, and has offices in Rotterdam, New York, and Brussels. Over the last three decades, West 8 has established itself as a leading practice with an international team of 70 architects, urban designers, landscape architects, and industrial engineers. West 8’s New York office was established after winning an international design competition in 2006 for the design of Governors Island Park - a 172-acre island in the New York Harbor. With a multi-disciplinary approach to complex design issues, West 8 has extensive experience in large-scale urban master planning and design, including pedestrian bridges, landscape interventions, waterfront projects, parks, squares and gardens. Working on an international level from its start, West 8 developed projects all over the world - in places such as Copenhagen, London, Moscow, New York, Madrid, Hamburg, Toronto, Amsterdam, Shanghai, and Seoul. Recently won competitions include West Kowloon Cultural District Park (HK), Governors Island in New York (USA), Madrid Rio (ES), Sagrera Linea Park (ES), and Yongsan Park in Seoul (KR). Amongst the numerous awards received by West 8 are the Global Award for Sustainable Architecture™, the Honor Award of the American Society of Landscape Architects (ASLA), the International Urban Landscape Gold Award (IULA), the Prix de Rome, the Dutch Maaskant Award, the Bijhouwer Award, the Green Pin, the Veronica Rudge Green Prize for Urban Design, and the Lifetime Achievement Award for Architecture of The Mondriaan Fund (previously BKVB, the Netherlands Foundation for Visual Arts, Design, and Architecture). West 8 was also a finalist for the Rosa Barba First European Landscape Prize. West 8 has completed the following projects: ROOSENDAAL PEDESTRIAN BRIDGE, THE NETHERLANDS West 8 performed the architectural design of the Roosendaal Pedestrian Bridge in the Netherlands. The design of a footbridge across railway tracks in Roosendaal, the Netherlands, is a challenging task that Roosendaal Pedestrian Bridge, The Netherlands D-15 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA D aimed at optimizing the viability and functionality of a large area surrounding the nearby railway station. The footbridge strengthens the relationship between the various urban precincts alongside the tracks and provides for a dialog in this context. The bridge provides an elevator and stairs for inclusive access. The bridge design is based on structural, functional and visual amenity determinants and a search for a strong character created by means of a simple construction. The proposed bridge provides an answer to this overall context by a balanced combination and integration of shape, structure, and construction materials. VLAARDINGSE VAART BRIDGE, THE NETHERLANDS Also called ‘The Twist,’ Vlaardingse Vaart Bridge is a helical truss bridge for pedestrian and bicycle traffic. The construction was possible via 400 steel tubes welded together at 90 degree angles to create the illusion of a twist. This red twist also serves a function purpose, damping vibrations from traffic on the bridge. The Vlaardingse Bridge is a crucial link within the regional bicycle path network of the province of South Holland and forms an urban recreational route connection. Also called ‘The Twist,’ Vlaardingse Vaart Bridge is a helical truss bridge for pedestrian and bicycle traffic. The construction was possible via 400 steel tubes welded together at 90 degree angles to create the illusion of a twist. This red twist also serves a function purpose, damping vibrations from traffic on the bridge. The Vlaardingse Bridge is a crucial link within the regional bicycle path network of the province of South Holland and forms an urban recreational route connection. D-16 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA D SOUNDSCAPE PARK, MIAMI BEACH, FL Working in partnership with The New World Symphony, West 8 designed a resilient and flexible park that serves as an overflow space for the symphony, as well as a public park for the community. SoundScape Park is a 2.5-acre urban park in the cultural and civic heart of Miami Beach. Capturing the spirit and vitality of the City, it is a flexible, multi-use space adjacent to the New World Center. D-17 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA D SoundScape Park serves as both an urban oasis and a gathering place for cultural and special events. Sculptural ‘baskets’ serve as the entry point to the park. These elements marry nature and art and have become an icon for the district, while also providing the area much needed shade. The park features two sound bars and a large outdoor projector, providing ‘Wallcast’ events for visitors to enjoy music events that are occurring inside the New World Symphony. MIAMI BEACH CONVENTION CENTER PUBLIC SPACES, MIAMI BEACH, FLORIDA West 8 has been involved in the public space development around the Miami Beach Convention Center since 2014. The focus of the Master Plan was to replace surface parking with lush streetscapes and parks that create key connections throughout the community. This green network was completed in 2020 with the finalization of Pride Park. SAVINO AND MILLER DESIGN STUDIO (SMDS), a FDOT certified firm with an award-winning studio, is located in North Miami, and will be the Landscape Architect for this project. SMDS will play a key role as urban designer advising the team regarding the final layout and site planning of the pedestrian bridge/ parkway. The SMDS office is located about six miles from the project site. Their projects in the City of Sunny Isles Beach include the City Hall Landscape Master Plan and Gateway Park. Over the last 25 years, SMDS has worked on several FDOT bridge and streetscape projects. These include the Brickell Avenue Median, Collins Avenue in Miami Beach, and the reconfiguration and beautification of the 41st Street bridges in Miami Beach over Indian Creek and Biscayne Waterway. SMDS has previously worked with EAC on many projects - most recently as Urban Designers and Landscape and Design Architects for the preparation on the PD&E Study for the Tamiami Canal Bridge. In this project, the task included the relocation and design of the Bridge Tender House, as well as bridge aesthetics. D-18 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA D Award Winning Project: South Pointe Park, Miami Beach Award Winning Project: Maurice A. Ferre Park, Miami SMDS provided consultation for Master Site Planning, paving materials and site furniture selection, and was the primary landscape architecture for the park’s planting and irrigation improvements. Downtown Miami waterfront 20-acre park adjacent to two museums. SMDS redesigned and valued engineered the proposed Bay-walk and entry promenade to keep integrity of original Concept. Scope included Paving, Planting, Irrigation, Urban furniture and lighting. D-19 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA D Award Winning Project: Aventura Optima Office Tower Manuel G. Vera & Associates Inc. (MGV), a Disadvantaged Business Enterprise (DBE) and prequalified under FDOT’s Work Groups 8.1, 8.2, and 8.4, will provide surveying services. MGV has been providing design survey and right-of-way mapping services to the Central and South Florida area for over 45 years, servicing Miami-Dade County, local cities, and FDOT Districts 4 and 6 for over 36 years, and the Florida Turnpike Enterprise for over 25 years. MGV’s past experience providing the same professional surveying and mapping services required for this signature bridge will ensure that this project is completed on schedule and within budget. Geosol, Inc. (GEOSOL), is a small professional firm that has been providing geotechnical services for over 20 years. GEOSOL is certified as a Small Business Enterprise (SBE) and Disadvantaged Business Enterprise (DBE) by FDOT, and qualified under FDOT’s Work Groups 9.1, 9.2, 9.4.1 and 9.4.2. The firm is based in Miami Lakes, within close proximity to the project location. The firm provides geotechnical engineering and testing services. In addition, GEOSOL has engineers who are CTQP certified in drilled shaft inspections. Mr. Oracio Riccobono, PE, has over 31 years of geotechnical experience, and is the lead Geotechnical Engineer of the firm. He is fully aware of the geotechnical conditions of the project site. Mr. Riccobono has been the Geotechnical Engineer of Record for many FDOT D6, MDX, Florida Turnpike Design Build and Miami-Dade Transit projects. Recently, he was the geotechnical Engineer-of-Record for the Hard Rock Stadium Pedestrian Bridges for the City of Miami Gardens. GEOSOL provides local knowledge of the area with national experience in pedestrian bridge design and award-winning projects across the United States. TLC Engineering Solutions (TLC) was founded in 1955 and consistently ranked among the largest Mechanical, Electrical and Plumbing (MEP) and structural engineering firms in the country. They are a highly qualified team of over 380 professionals - including professional engineers, LEED-accredited professionals, and ACG-registered commissioning authorities, coupled with specialists in acoustics, energy management, and technology. TLC will provide MEP Design Services. Smart-Sciences, Inc, a Woman Owned Business Enterprise (WBE) and DBE FDOT certified firm, provides expertise in environmental permitting, ecological consulting and environmental science. They provide innovative solutions that promote smart growth and human development in an environmentally sustainable manner. SMDS prvodied the Landscape Master Plan for two green roof terraces. This is one of 2 buildings in South Florida to obtain Leed Platinum. Scope inluded Landscape plan, Hard-surface, Water Features, Outdoor lighting. D-20 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA D ASA Consultants, Inc. (ASA) is an FDOT certified firm that offers highway and structural engineering services. ASA specializes in all facets of highway and structural engineering, and will be performing peer review for this project. They are organized in distinct service niches - that include minor, major, and complex roadway design, miscellaneous structures and minor and major bridge design, conventional bridge inspection and bridge load rating, and signing, pavement marking, and channelization and qualified under FDOT Work Groups 3.1, 3.2, 3.3, 4.1.1, 4.1.2, 4.2.1, 4.2.2 , 4.2.3, 5.1, 5.4, and 7.1. ASA has worked exclusively in South Florida, primarily in FDOT Districts 4 and 6. In addition, ASA has served as staff augmentation for FDOT D4 for the past three years. ASA consultants was involved in design and construction plans for the emergency pedestrian bridge over the Intracoastal waterway, locally known as Town Center Park Canal, between NE 174th St. and NE 172nd St., along North Bay Road, City of Sunny Isles Beach. This project was within a very tight right-of-way, and included replacement of existing sea walls on the north side of the canal. LARS engineering, Inc. (LARS), an FDOT certified firm for the past decade, has inspected over 1,500 Bridges in the State of Florida, including pedestrian bridges. LARS recently performed the initial inspection for the Pedestrian Bridge at Hard Rock Stadium, in the City of Miami Gardens. They are knowledgeable of the latest inspection and reporting techniques and procedures established by FHWA. LARS’ commitment includes reviewing all kinds of inspection reports of pedestrian bridges to determine the most common type of deficiencies found in the history of repairs. They bring an unmatchable mixture of experience and dedication to guarantee that the quality of work exceeds expectations. LARS’ key staff have completed several FHWA-NHI training classes, including safety Inspection of in-service Bridges. Choice Engineering Consultants, Inc. (Choice), is a DBE, SBE, Civil Engineering firm - specializing in Roadway and Traffic Engineering. Choice provides design solutions in Traffic Engineering and Operations Studies, Traffic Safety Analysis, Traffic Operations Design, and ADA compliance support and planning. Since its inception in 2015, Choice has been proudly selected to serve as FDOT’s Districtwide Signal Retiming Consultant for Miami-Dade and Monroe counties, and has served FDOT District 6 for the past five years. Janus Research is a Cultural Resources Management (CRM) firm that consistently provides the FDOT with high-quality cultural resource management services. They have a solid understanding of the challenges posed by federal laws, regulations, and guidelines, and know how to negotiate the complex process of State Historic Preservation Office (SHPO) and regulatory approval. They excel at developing creative mitigation strategies with little or no impact to construction schedules. They have long-standing relationships with the staff of the Florida Division of Historical Resources’ Compliance and Review Section, the Federal Highway Administration, the State Archaeologist, the SHPO, the Miccosukee Section 106 Representative, and the Seminole Tribal Historic Preservation Officer. GlobComm, LLC Luz Weinberg is CEO of GLOCOMM, LLC, a communications firm with extensive experience and successful results in Construction Impact Mitigation of public and private large-scale and projects in Miami, Florida and Canada. GLOBCOMM MINORITY BUSINESS ENTERPRISE (MBE) AND DISADVANTAGES BUSINESS ENTERPRISE (DBE) PARTICIPATION EAC is a State of Florida certified Minority Business Enterprise (MBE). On this contract we are proposing to utilize DBE firms with whom EAC has a strong partnership and who have worked together on several previous undertakings. As a graduate of the DBE program, EAC is committed to significant DBE participation goals on our contracts. Our commitment to DBE participation and the development of small businesses is best exemplified by the fact EAC is the 2020 recipient of FDOT/ACEC FL’s DBE award for the most DBE participation in the state. D D-21 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA PROJECT APPROACH AND UNDERSTANDING The EAC Team is ready to refine and complete the selected design concept for the 174th Street and Collins Avenue Bridge Park. We have studied the Sunny Isles Pedestrian Overpass Planning Study and the 2016 Transportation Master Plan to fully understand the project scope. The project is in one of the most heavily traveled intersections by pedestrians and vehicles within the City of Sunny Isles Beach. The concept design will be an open and elevated bridge park over the south side of the intersection, traveling east and west, to accommodate vehicular improvements at the surface level, and to take pedestrians to an elevated plane for an enhanced crossing experience - reflected as an extension of the Samson Oceanfront Park. Our Project Team provides a fresh approach in order to identify potential refinements to the concept design; our experience on pedestrian bridges allows project familiarity that will improve the concept design and maximize efficiency and cost effectiveness. Our portfolio of pedestrian bridge projects is indicative of our familiarity with infrastructure works within pedestrian bridge facilities locally and nationally. The EAC Team brings an in-depth understanding of the needs associated with this project. The scope of work includes the design of a pedestrian link that will become an extension of the adjacent Samson Oceanfront Park, creating a “destination experience.” The new link will be green and sustainable, and will incorporate the use of native plants to create a buffer for pedestrians crossing Collins Avenue. It will be designed as a plaza, with landscaping, creating an elevated park. The connection will be fully American with Disabilities Act (ADA) compliant and accessible with stairs and elevators on the east and west approaches. It is our mission to design a pedestrian green crossing that is visually attractive, structurally efficient, and cost effective. ARCHITECTURE Savino and Miller Design Studio (SMDS) and West 8 Urban Architecture and Landscape Architecture (West 8) - both award-winning firms will be the design Architects for this project. As part of the EAC Team, both firms will collaborate in urban design and play key roles in the bridge park concept development and final design. The main objective for the Pedestrian Bridge Park is to creatively design a sustainable “park in the sky” that is environmentally friendly, socially vibrant and inviting to its users. In 2017, West 8 completed the site plan design for the SoLe Miami Beach Hotel just adjacent to the project location. As a result, the EAC Team is extremely familiar with the project area. Our proposed design meets the City’s goals by creating an efficient, pragmatic, yet beautiful bridge experience that links the West side of 174th Street with the beach. Collins Avenue is currently acting as a barrier for those in the neighborhood wishing to reach the Oceanfront Park and the Beach. This bridge eliminates this barrier with an iconic, ADA compliant design, that links the east and west seamlessly by borrowing from existing design languages and planting palettes. Figure 1: Aerial View of Collins Avenue and 174th Street D-22 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA D The proposed bridge park has created an open and inviting green space that facilities safe passage across Collins Avenue, while serving as an icon for Sunny Isles Beach. The bridge park is a destination experience that complements the adjacent park while providing pedestrian and vehicle access. The architectural concept provides a single span boxed shape concrete bridge structure utilizing U-beams and a concrete deck supported by V-shaped columns. We have proposed tempered impact resistant glass railings that are approximately 8-ft. in height. The design strategically incorporates vegetation across the bridge - that seamlessly links the east and west landscape areas. The proposed Bridge Park is intended to be more than just a park. The local residents and tourists will be able to walk through the gardens, view art, experience a performance, and connect with friends and neighbors - all while enjoying a unique perspective of the City of Sunny Isles Beach. The EAC Team is committed to improving the use of public spaces in the area, quality of life of its residents, and creating a connected, healthy neighborhood and city. The EAC Team proposes the following two alternatives: 1. Maintain the City’s vision and include a cantilevered sitting area; or 2. Provide a seamless elegant connection at 174th Street that links the west of Collins with Samson Oceanfront Park and the beach. This connection is provided by an elevated Bridge Park and gracefully sloped stairs that tie into the adjacent Samson Oceanfront Park. Figure 3: Conceptual Bridge Park Alternative 1 – Elevation View 2 Figure 2: Conceptual Bridge Park Alternative 1 - Elevation View 1 D-23 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA D Figure 4: Conceptual Bridge Park Alternative 1 – East to West Plan View Figure 5: Conceptual Bridge Park Alternative 1 – West to East Plan View In order to optimize the investment, and the bridge’s function, the manner in which the bridge connects to the Samson Oceanfront Park creates a tiered flexible event-space, where people can sit and gather as they look out towards the ocean. Figure 6: Bridge Park Connection to Samson Oceanfront Park D-24 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA D Driving the Team’s design proposal are the following key factors: Building from Local “Know-How” The bridge’s structure and adjoining elements are made of concrete - a material that South Florida specializes in, and has local experience using and installing. Adapting a design to a place’s local industry, knowledge base, and experience not only reduces project costs, but also ensures fewer complications during the manufacturing and construction processes. The use of concrete also eliminates erosion concerns and the need for repainting – which are common issues with steel bridges. Efficient Engineering The structural design of the bridge is simple and minimizes ornamentation. Our design employs concrete U-beams and two primary columns as its base. This base supports box shape concrete girders, a precast deck system, and dependable waterproofing to create a pragmatic and cost effective design. Iconic Identity An iconic bridge can bring a sense of identity and place to the Sunny Isles Beach community. The bridge will not only serve as a crucial link, but also as a gateway and a landmark for Sunny Isles Beach. This is an incredible opportunity to bring great design into the public realm. Our bridge design optimizes this opportunity; building from the neighborhood’s surrounding aesthetic, and emphasizing the incorporation of nature and green with infrastructure. Our proposal to include iconic shade structures atop the bridge is part of this positive effect. This will allow the bridge to have a greater presence and iconic impact in the area. We have proposed to integrate these artistic pergolas to provide shade upon the City’s request. Figure 7: Conceptual Bridge Park with Iconic Shade Structures Alternative 2 – Elevation View 1 Figure 8: Conceptual Bridge Park with Iconic Shade Structures Alternative 2 – Elevation View 2 D-25 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA D Figure 9: Conceptual Bridge Park with Iconic Shade Structures Alternative 2 – West to East Plan View Figure 10: Proposed Bridge Typical Section View PROPOSED BRIDGE STRUCTURE The proposed bridge will have a main span of 165-ft., with a cantilevered span providing seating for pedestrians. Bridge width will vary from 49-ft. to 61-ft., with a minimum vertical clearance of 21-ft. Florida-U Beams (72-in.) can be utilized to support the pedestrian loads and dead loads including soils, plants, glass walls and glass railings, and miscellaneous items. The U-beams will be precast and erected at night with no traffic under the beams - for public safety and ease of erection. The beams will be securely connected to the supporting piers to ensure stability of the structure immediately after the erection. D-26 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA D To minimize impact to local traffic, precast decks can be used, integrating with the U-beams, for an integral bridge structure. The bridge layout and pier structures will have the architectural and park features desired by the City. Foundation systems like Auger Cast- In-Place (ACIP) piles, driven piles, and drilled shafts can be considered. Driven piles will create vibration and noise and have impact to the existing structures and local activities. ACIP piles and drilled shafts will eliminate these concerns. Drilled shafts also have the least footprint, which may be critical to minimize impact to local traffic during construction. In the preliminary design phase, we will evaluate different structural systems for both the superstructure and substructure, along with the park themes and architectural features in close coordination with the City. Final design will be performed per the City’s selected alternative. The bridge’s typical section will include both landscaping and pedestrian zones separated by glass railings. The minimum width that we recommend for the pedestrian walkway zones are 12-feet., but with additional space to add landscaping and seating and other amenities. We propose the landscaping be provided separate from the bridge structure for maintenance concerns. The elevated bridge park will include benches, planters, steps and ramps, bicycle racks, trash and recycling receptacles, railings, and aesthetic lighting. GEOTECHNICAL/FOUNDATIONS The EAC Team has reviewed all data available to determine the geotechnical approach for this project. The presence of the variable subsurface conditions - coupled with a residential setting, high traffic volume, and a noise sensitive site –- makes the foundation design and construction extremely challenging. Our approach will make full use of our knowledge as the lessons-learned from recent construction projects. All required geotechnical services will be performed in accordance with FDOT’s current Soils and Foundation Handbook (2020). Borings and rock coring will be required at each foundation location to confirm the subsurface conditions in the project area. One SPT boring per pier/bent will be performed to obtain more comprehensive geotechnical information and to reduce risks of pile or drilled shaft overruns and schedule delay. The EAC Team has performed a preliminary evaluation of shallow and deep foundation options. Given the unfavorable near-surface subsurface conditions, spread footings are not feasible - due to the relatively low soil bearing capacity and predicted excessive settlements from the underlying loose to very loose sandy soils. Drilled shafts are a feasible foundation system - using relatively low vibration equipment - and hence are friendly to the surrounding environment. Since FDOT has now allowed the use of ACIP pile foundations for bridge structures, we will also explore the use of 24-in. diameter ACIP pile foundations. Use of ACIP piles, similar to drilled shafts, will eliminate the risks of causing vibration-related damages to existing structures. FDOT has presently prepared developmental specifications for the use of ACIP pile foundations for bridge projects. GEOSOL is currently working as part of the FDOT Review Team for the I-395 design-build project, and working with FDOT’s Central Office in the implementation of ACIP piles for foundation of the signature bridge and the concrete box segmental bridges. For the elevators and stairs, the EAC Team will evaluate the use of ACIP. ACIP piles have been successfully and economically used on numerous transportation infrastructure projects in Miami-Dade County - including the City of Miami Beach’s West Avenue vehicular bridge over the Collins Canal, Miami-Dade Transit elevated guideway bridges, Miami International Airport (MIA) parking garages, MIA transportation hub, MIA vehicular bridges, and a 200-ft. high air traffic control tower at the Miami Opa-Locka Executive Airport. Also, in South Florida’s private sector, Auger Cast Piles are commonly used to support heavily loaded structures - such as high-rise condominium towers, hotels, and arenas. CONSTRUCTABILITY We have performed a preliminary constructability analysis for the bridge construction - focusing on the safety of structures and people - and with minimal impact to the traffic and local activities in the area. Use of precast elements will minimize the need for forms and falsework, facilitate the construction activities, and improve efficiency and overall progress of the construction. We propose to utilize precast concrete U-beams for the superstructure girders. The U-beams will be transported to the job site, first through water on a barge, then to the proposed bridge location by trucks, as shown in this proposal’s Beam Delivery Section. Two sets of cranes will be used to pick up the beams - one set at the docking area to pick up the beams from the barge and load them onto the trucks, and one set at the bridge location to unload the beams from the trucks and erect them in their designed positions related to the bridge’s structure. Maneuvering and operation of the cranes will be limited locally to the docking area and bridge location without any significant impact to the roadway and facilities. During the pick-up, transport, and erection of the beams, the local roadway will be closed at nights when traffic impact is minimal. Ensuring beams are properly installed at night, when the road is closed to traffic, and opening the roadway to traffic in the morning will minimize risks and efficiently facilitate the process. D-27 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA D For bridge decks, two options will be evaluated: cast-in-place decks and precast decks. Cast-in-place decks can be provided utilizing the stay-in-place forms. Precast decks will eliminate the need for the stay-in-place forms and require less construction time for the deck. Both options will be evaluated in the Alternate Study Phase (30%) of the final design. For Bridge Foundation, as described in the Geotechnical/Foundation Section of this proposal, drilled shafts or auger cast piles are recommended. Both the pier and elevator structures are located in the sidewalk areas. There is sufficient space at both ends of the bridge to set up a work zone to place and operate the drilling equipment for foundation construction. Pedestrian traffic will be properly and safely maintained outside the work zones. After the foundation is complete, the drilling equipment will be removed, ready for the pier and elevator tower construction - also within the work zones. As demonstrated in the Construction Sequence Section of this proposal, the bridge and elevator towers will be constructed in sequence without any significant impact to the traffic or pedestrians. BEAM DELIVERY Concrete U-beams in full length (about 165 ft.) after manufacturing and curing in the casting yards, will be shipped through water on a barge. The beams will be picked up at a location north of NW 183rd Street as shown below. The beams will be transported to the proposed bridge location on a truck through 183rd Street and Collins Avenue. Figure 11: Beam Delivery Route D-28 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA D CONSTRUCTION SEQUENCE We have evaluated a Construction Phasing Sequence to provide efficiency and safety for the bridge construction: Phase 1 Phase 2 Phase 1: Install Temporary Barrier Wall and Close Sidewalk on West Side, Redirect Pedestrian Traffic to the East Side sidewalk, Build Foundation, Pier and Drainage for the West Side. Phase 2: Install Temporary Barrier Wall and Close Sidewalk on East Side, Redirect Pedestrian Traffic to the West Side sidewalk, Build Foundation, Pier and Drainage for the East Side. Install Temporary Signal and Lighting. The EAC Team has evaluated the beam transportation method with an AutoTURN analysis to investigate if the beam delivery from the 183rd Street and Collins Avenue intersection is attainable. The analysis includes vehicle access checks, clearances, vehicle tracking, and path maneuvers. As a result of the analysis, the overall length of the beam delivery truck (including the U-beams) will be able to make the turn at the 183rd Street and Collins Avenue intersection without any major impacts. Figure 12: Beam Delivery Truck AutoTurn Analysis D-29 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA D Phase 7 Phase 6 Phase 6: Install Temporary Barriers along A1A South and shift traffic to A1A North (two-way) during the nighttime. Pour the Deck and install Railing on the West Side. Install Temporary Barriers along A1A North and shift traffic A1A South (two-way) during the nighttime. Pour the Deck and install railings on the east side, Lighting.and Signals. Phase 3 Phase 4 Phase 5 Phase 3: Install Temporary Barriers along A1A South and North, detour Traffic South and North of 174th Street During the Nighttime. Deliver and Install Beams over SR A1A. Phase 4: Install Temporary Barrier Wall and Closed Sidewalk on East Side, Detour Pedestrian Traffic to the West Side Sidewalk, Build Cast-in-Place Seating Structure, East Elevator Structure and Stairs. The same sequence is used for the sloped stairs. Phase 5: Install Temporary Barrier Wall and Closed Sidewalk on West Side, Redirect Pedestrian Traffic to the East Side sidewalk, Build West Elevator Structure and Stairs. Phase 7: Repeat Phase 1 and 2 as necessary for Landscaping. CAST IN-PLACE SEATING STRUCTURE OR SLOPED STAIRS D-30 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA D MAINTENANCE OF TRAFFIC Given the high volume of vehicles and pedestrians using Collins Avenue, safety of the traveling public and construction workers are paramount for this project. Not only must a safe work zone be guaranteed, but the public must confidently perceive it as such. The EAC Team will prepare a construction phasing and Maintenance of Traffic (MOT) sequence that makes safety considerations front-and-center. It is expected that the construction of the towers and pedestrian ramps on both sides of Collins Avenue can be constructed without impacting vehicular traffic. Appropriate measures to detour pedestrian traffic will be provided should sidewalks and paths in the park require closure. Construction of the elevator towers will be performed one at a time in order to keep one side of Collins Avenue unimpeded at all times, allowing for continuous pedestrian movement. Vehicles may not use Collins Avenue during the erection of the bridge structure which will require closure of the roadway. It is estimated that the erection of the bridge, ensuring proper bracing of all elements and confirming it is safely in place, may take up to three days - during which time vehicular detours will be provided for both the southbound and northbound directions of travel along Collins Avenue (see figure to the right). Pedestrian traffic at the bridge location will be limited to the east side of the roadway and diverted along the back perimeter of the park. Advance notification of roadway and sidewalk closures will be communicated to the local community well in advance of the actual closures and adequately communicated with temporary signs and digital message boards during the closure. The EAC Team will work closely with the City and the community to solicit feedback in order to develop an MOT plan that takes the needs and concerns of all parties into consideration. We will also coordinate and communicate the MOT plan and construction phasing, during design as well as during construction, with local law enforcement and emergency responders to develop routes that result in the lowest response times. Due to the nature of this project (specifically the need to erect the bridge elements), impacts to the traveling public cannot be completely eliminated, but the EAC Team will work closely with the community to mitigate against impacts to the furthest extent possible. ROADWAY SAFETY The EAC Team will comply with all safety vertical and horizontal clearances and setback requirements, while also designing a pedestrian bridge that will fit well in the context and become an attractive link between the neighborhood and the beach. We have proposed a construction sequence that minimizes impacts to the busy roadway. D-31 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA D LANDSCAPE ARCHITECTURE & URBAN DESIGN SMDS - an award-winning studio located in North Miami - will be the Landscape Architect for this project and will play a key role as urban designer advising the team regarding the final layout and site planning of the pedestrian bridge/parkway. The SMDS office is located about six miles from the project site. SMDS projects in the City of Sunny Isles Beach include the City Hall Landscape Master Plan and Gateway Park. Over the last 25 years, SMDS has worked on several FDOT bridge and streetscape projects. These include the: »Brickell Avenue Median, Collins Avenue in Miami Beach, and the »Reconfiguration/beautification of the 41st Street bridges in Miami Beach over Indian Creek and Biscayne Waterway. In addition, SMDS has previously worked with EAC on many projects, most recently as the Urban Designers and Landscape and Design Architects for the preparation of the PD&E for the Tamiami Canal Bridge - where tasks included the relocation and design of the Bridge Tender House as well as bridge aesthetics. A key issue in the proposed bridge parkway will be the design of planting and pedestrian-friendly spaces, possibly even incorporating seating and viewing areas. SMDS has significant experience in planting over structural decks, the most relevant being the Aventura Optima ‘Green Roof’ designed over a parking Garage. This project was the second LEED Platinum Building in South Florida, and received awards from Florida’s ASLA and nationally from the Green Roof for Healthy Cities Organization. SMDS will work in close collaboration with the Bridge Engineers, Bridge Architect and Project Team to define the design guidelines and requirements for the landscape architecture on the bridge, and lend their expertise to help the City to achieve their project goals, which include; 1. ICONIC AND & EMBLEMATIC The bridge design will take advantage of its proposed location over Collins Avenue to connect with the waterfront Samson Oceanfront Park. This pedestrian bridge has the potential to become an iconic architectural element for the City of Sunny Isles Beach, as well as critical infrastructure to make moving through the city safer, easier, and more pleasant for pedestrians. The shape and materials used will be key in designing a bridge that is both emblematic and structurally sound. Coordination between the engineering and architectural teams will be essential at this stage in the design process. Figure 13A: Proposed Landscape Architecture Alternative 1 - Base Scheme Figure 13B: Proposed Landscape Architecture Alternative 2 – Iconic Shade Structure Scheme D-32 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA D 2. BE A DESTINATION AND EXPERIENCE The bridge should be a destination in and of itself. The experience of moving up, across and down the bridge should feel natural. There are several ways to do this, and some options to be evaluated for this project include: elevators, progressive ramp-ways, commercial opportunities, recreational programs, passive park-like settings, ways to create a natural connection to the park, etc. The general idea is to create special uses or experiences to the bridge in addition to its functional quality. 3. BRIDGE TO HAVE A “PARK” CHARACTER One potential bridge design concept will be to balance the loss of green space caused by Collins Avenue by “raising” the landscape above the street, essentially creating a Park Bridge Oasis. This concept not only provides stormwater management benefits, but invites people to enjoy the space, activating it with special uses that complement the existing park. It will also create panoramic views over the park, ocean and city beyond. 4. COMPLEMENT AND HARMONIZE WITH SAMSON OCEANFRONT PARK We envision the design of the bridge as an extension of the park, creating a greenway link to the west side of the City. Our team will design the bridge to add and allow new programs to Samson Oceanfront Park. The planting palette will be comprised of coastal, native hammock, and dune species. Emphasis will be on coastal, salt resistant, and wind resistant plants to comprise the planting palette. This bridge design will require structural, architectural, urban design and landscape architectural services to seamlessly integrate it within the City’s mobility network as well as its open spaces. SMDS will be involved from the beginning of the programming / schematic design process to define planting areas, pedestrian paths, and passive areas in order to delineate a clear approach to irrigation, depth of planting areas, types of soils and types of planting. SMDS will also contribute to the urban design and layout of the bridge, in coordination with the bridge architect, structural engineer, and all other consultants. INTEGRATION OF LANDSCAPE, ARCHITECTURAL AND STRUCTURAL FEATURES The bridge’s open space design is conceived as a meandering coastal palm hammock in freestanding planters interwoven with a sculptural shade pergola and walkways. The planters are set into the bridge to create seatwalls that float over the bridge structure to minimize maintenance and separate soil and water interfaces, while allowing for clear sightlines along the bridge for security. Likewise, drainage of the planters will be completely independent of the bridge’s structure. The plant palette will be primarily native species, selected for their resilience to wind, salt and drought, and reduction of maintenance requirements such as leaf/fruit litter, fertilizer, pest control and pruning. In addition, the bridge’s glass panels are offset from the planters for ease of maintenance and access. Figure 14: Proposed Landscape Architecture Section View D-33 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA D PEDESTRIAN BRIDGE RAILINGS One of the major objectives for this project is to avoid the use of a fence or cage over Collins Avenue - which is common in many pedestrian bridges in Florida. We propose to use landscaping and a buffered area so that pedestrians are not walking adjacent to the roadways below. This will allow for a more natural and open bridge design. The proposed conceptual glass railings are aesthetically pleasing and provide clear visibility from both above and below the bridge. A maintenance concern due to the salt derived from the proximity to the beach, however, may need to be evaluated. During the preliminary design phase, we will evaluate this alternative along with other options and strategies that would not require the cleaning and maintenance associated with glass. ELEVATORS The proposed elevators will be designed and positioned in strategic locations that will not impact pedestrian circulation near and under the new pedestrian bridge. We will recommend the use of highly resistant materials to minimize maintenance in the future. We have recently designed several pedestrian bridges with elevators, and are acquainted with all the features required to extend longevity and reduce life cycle costs. AESTHETIC BRIDGE LIGHTING The aesthetic lighting will enhance the appearance of the pedestrian bridge at night, and will provide a safer and more comfortable crossing. We will propose the use of low maintenance Light Emitting Diode (LED) lighting that is well integrated with the architecture of the bridge. The use of lighting fixtures that change colors for special events could be added to the project at minimal cost. We will provide indirect lighting and conceal the location of conduits and electrical connections. We will also provide cut-off luminaries to not impact the adjacent residential buildings surrounding the crossing, and follow Florida Fish and Wildlife Conservation Commission (FWC) guidelines for the use of turtle-friendly fixtures. ENVIRONMENTAL APPROACH The environmental approach for the project will center on identification of protected resources and potential contamination issues for consideration in the construction of the pedestrian overpass located at the Collins Avenue (A1A) and 174th Street intersection. This concept design recommends an open and elevated bridge park over the south side of the intersection, traversing east and west, to accommodate for vehicular improvements at the surface level and to bring pedestrians to an elevated plane for an enhanced crossing experience reflected as an extension of the Samson Oceanfront Park. Smart-Sciences will identify protected resources and potential contamination issues and will work with the design team to minimize and avoid impacts to the greatest extent practicable. Smart-Sciences conducted preliminary research for the study area. Based on GIS and ETDM reviews, Smart-Sciences has identified the following environmental considerations and their potential effects: Contamination: Few potential hazardous materials sites were identified within the vicinity of the proposed pedestrian bridge - including FDEP storage tank contamination monitoring sites and petroleum contamination monitoring sites. Potential Effects: A Contamination Screening Evaluation Report will be prepared. This will be important for dewatering, areas of earthwork, and placement of exfiltration trench. Wetlands/Surface Waters: No wetlands or surface waters are present at the landing areas of the proposed pedestrian bridge or along the corridor. No wetland permitting with the County, State or USACE is required. Potential Effects: None Wildlife and Habitat: The proposed pedestrian bridge lies within the US Fish and Wildlife Service consultation areas of the American Crocodile, Florida bonneted bat, piping plover, and the manatee. Several trees are located in the landing areas of the proposed pedestrian bridge. Potential Effects: A Listed Species Technical Memorandum will be prepared. If endangered or threatened species involvement is identified, a biological assessment for formal consultation will be prepared. There are numerous street trees and structures within the proposed project location that could be suitable for roosting by the Florida bonneted bat. A roosting or acoustical survey may be required. There is no in-water work proposed, therefore, there are no anticipated impacts to manatees and American crocodiles. There is also no work proposed in habitat for the piping plover, therefore no anticipated impacts are expected. Trees: If trees are proposed for removal or relocation a tree removal permit will be required from Miami-Dade County. Bonneted Bat Sea Turtles D-34 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA D CULTURAL RESOURCE ASSESSMENT Janus Research prepared a cultural resources desktop analysis and field review in December of 2019; it was reviewed by the State Historic Preservation Officer and who concurred with our findings in January 2020. As part of this documentation, two historic resources were identified, a portion of Collins Avenue and a building at 18080 Collins Avenue, both of which are ineligible for inclusion in the National Register. No archaeological resources were identified. As part of this most recent RFP, Janus Research will evaluate the latest project improvements to determine if additional resources will need to be documented in compliance with state and federal regulations. SURVEYING AND MAPPING AND SUBSURFACE UTILITY ENGINEERING SERVICES (SUE) For this signature project with the City, the necessary survey elements required for the successful design of the pedestrian bridge will include baseline of survey and right-of-way establishment, DTM/Topographic survey, drainage survey, etc. Survey information will be gathered via a combination of conventional EFB data collection and LiDAR imagery. Utilizing static LiDAR will allow the team to gather a complete detailed topographic survey with one field mobilization, and allow the team to pull additional detailed information throughout the design process (wire heights, mast arm details, renderings for public involvement meetings, etc.) without having to remobilize, thus saving design dollars, which can be utilized by the City elsewhere. In addition to the design survey, Subsurface Utility Engineering (SUE) will be required. In order to accurately locate the existing utilities within the project area, MG Vera (MGV) will follow the ASCE 38-02 “Standards Guideline for the Collection and Depiction of Existing Subsurface Utility Data.” MGV will provide Quality Level B Utility Designates to horizontally map these utilities and Quality Level A locates (test holes – vertical/horizontal – optional services) as required for utility conflict resolution/avoidance. UTILITY COORDINATION Utility Coordination is a critical component to the success of a project. Our Utility Coordination Manager, will be responsible for managing all utility coordination efforts. Successful coordination begins with early contact with utility owners, and keeping all project stake holders (FDOT, EOR, UAOs) up to date on project status. Conducting regular utility coordination meetings is critical. This will ensure utility owners, the design team and the City are up to date on all utility phases of the project, and are working together to resolve potential utility conflicts. During the life of the project, an important utility coordinating management tool will be to maintain an updated Utility Conflict Matrix as a living, critical decision-making, document - from start to finish. This will allow the team to keep track and ensure all potential conflicts are resolved. All utility coordination efforts will be in accordance with FDOT, FHWA, AASHTO standards, procedures, and design criteria. Utility coordination efforts will include, but are not limited to: working with the EOR to identify and resolve potential utility conflicts, coordinating new installations, holding necessary coordination meetings, distributing plans as necessary, identifying and preparing all reimbursable rights paperwork, processing agreements as needed (i.e., Utility Work by Highway Contractor, Lighting Agreements, Joint Participation Agreements, etc.), and certifying to the District Utility Administrator all Utility Work Schedules, etc. PUBLIC INVOLVEMENT APPROACH The City of Sunny Isles Beach Pedestrian Bridge Project Community Outreach and Impact Mitigation Plan will provide proactive information dissemination to and input from Project Stakeholders immediately and throughout construction. Project Stakeholders must include the City’s residents, its elected body, the FDOT, and particularly the project’s Primary Service Area (PSA). PSA stakeholders include residents, businesses, and houses of worship immediately surrounding the Project site at A1A and 174th Street. Given the City’s commerce and tourism, the Plan must also include City visitors from abroad and secondary PSAs in neighboring municipalities - like Aventura and North Miami Beach to the west, Miami Beach to the south and Golden Beach to the north. The Plan will center around the anticipated Primary Project Challenges, which include construction impacts such as safety, noise, dust, and water impact mitigation, traffic (MOT, materials deliveries, hauling, etc.) and access limitations (road and beach), schedule, and design aesthetics. The successful delivery of the large-scale South Florida projects managed by our proposed project PIO focused on early, targeted, proactive engagement and buy-in from the community, and is also proposed for this project vis-a-vis multi-language, live “Condo Chats,” online (social media) project informational forums, and Project Progress Reports. All aspects of the Plan will be delivered using federal, state, and local health and safety mandates and guidelines. D-35 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA D INNOVATIVE CONCEPTS The EAC Team has identified a base bridge model with “add on” elements that can be incorporated upon the City’s request. We have created a simple scheme that can be transformed with a combination of separate elements based on the City’s desires and budget. Figure 14: Bridge Park Base Model Figure 15: Bridge Park with Overhead Shade Structures Below are some add-on alternatives that the EAC Team will consider during design development: Overhead Shade Structures - Our proposal provides an option for iconic overhead shade structures of aluminum material. These structures borrow from the aesthetic of existing pergolas in the Samson Oceanfront Park and strengthen the cohesive design relationship between the bridge and park, while providing comfort for pedestrians on the bridge. D-36 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA D Bridge Park Sloped Stair Structure with or without Art Display – If the City desires, the EAC Team will incorporate the sloped stair connection from the bridge park to the Samson Oceanfront Park, in addition to the proposed elevators on the east side. We propose to expand the role of contemporary art in public spaces. We recommend an art display or mural with turtle friendly lighting under the bridge sloped stairs. This will enhance the bridge park design and create a free extraordinary experience for its users. This element will also eliminate vagrancy under the bridge. Figure 16: Bridge Park with Sloped Stairs Structure Figure 17: Improved Bridge Structure Improved Bridge Structure – The EAC Team will evaluate a geometrically lighter bridge without v-shaped columns. The current proposed structure can appear lighter and feel less aggressive to incoming vehicular circulation while improving bridge aesthetics and constructability. Native Plants – The EAC Team will propose 100% native plants that are hardy and sustainable and will not need as much maintenance, irrigation, or fertilizer. This alternative will also beautify the location by attracting butterflies and other pollinators. Lighting – The EAC Team will evaluate the use of LED or solar lighting in a way that is iconic and turtle friendly. New Railing Alternatives – During the design development we will work with the City to propose the use of railing material alternatives which can be very transparent and will not require major cleaning and maintenance costs. This will eliminate the possibility of graffiti vandalism and salt spray from the beach location that can provide a cloudy appearance. ADA Compliant Ramps – If the City desires, the EAC Team can also evaluate the use of gracious ADA compliant ramps instead of one or two of the proposed elevators. This new concept will minimize the maintenance required for elevators in public areas, and reduce D-37 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA D the life cycle cost for the structure. Eliminating the elevators will also improve safety for pedestrians during late dark hours and the possibility of bad odors in the structures. PROJECT MANAGEMENT PLAN Our commitment to the City of Sunny Isles Beach is to meet all project milestones and produce a cost-effective quality product that avoids construction issues and minimizes future maintenance. We will utilize weekly team meetings that clearly convey the City’s expectations on scope, budget, schedule, and quality. The Project Manager, K.T. Lin, PE, PhD, and Deputy Project Manager, Stephanie Romero, PE, will run team meetings and coordinate communication with all project discipline leaders to ensure that expectations are met. Monthly progress meetings will be held with the City’s Project Manager and project stakeholders to ensure proper coordination of the project scope, schedule, and budget. Our approach includes risk assessment and a proactive approach to addressing issues, which will minimize the involvement of the City’s Project Manager, while keeping her informed of all project issues. Project Schedule We will monitor the Project Schedule via schedule updates with monthly progress reports, which will include a 90-day look ahead analysis to identify critical path activities and opportunities to accelerate the design schedule. Our PM is committed to continuously work closely with the City to ensure that all activities are completed as planned. Below is the Preliminary Project Schedule from project initiation to construction completion: Project Budget EAC will be proactive in managing the project budgets. We are attentive to the City of Sunny Isles Beach proposed budgets for design and construction: • Design Budget: $1,995,000 • Construction Budget: $11,055,000 • Total Budget (Design + Construction): $13,050,000 D-38 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA D The EAC Team will be vigilant and monitor the design budget monthly to ensure that all invoices are based on progress and documented in our progress reports. We will also validate throughout the design process that the proposed concepts are aligned with the estimated construction budget. Quality Assurance/Quality Control (QA/QC) A project-specific QA/QC plan will be submitted to the City’s Project Manager within ten days of the Notice to Proceed (NTP), and will follow FDOT procedures, utilize checklists, perform constructability reviews, incorporate lessons-learned, and will be used by the entire project team, including sub-consultants. FDOT Local Agency Program (LAP) and Funding Coordination FDOT provides sub-recipient towns, cities and counties funds to develop, design, and construct transportation facilities with federal funds. FDOT is the steward of the federal funds and is responsible for oversight of funded projects on behalf of the Federal Highway Administration (FHWA). LAP agencies prioritize and fund local projects (through their respective MPO or governing board) and are then eligible for reimbursement for the services provided to the traveling public through compliance with applicable Federal statutes, rules, and regulations. EAC understands the requirements of the FDOT’s Local Agency Program (LAP) Manual as it relates to projects such as this - that involve a bridge structure crossing a roadway. We will comply with -the FDOT’s latest revisions to the LAP Manual, the Florida Design Manual, Structures Manual, and Standard Plans for these bridges. As part of the EAC Team, Harold Desdunes, PE, and ex-Director of Transportation Development for FDOT’s District 6, will lead this coordination effort. He is extremely familiar will all FDOT requirements, procedures, and funding opportunities - and will ensure that the Project Team performs close coordination with FDOT’s Central Office. This will ensure our Project Team is following all FDOT design procedures and meeting all design requirements in order to protect the lives, health, and public safety. Qualified Independent Peer Review EAC has included a peer review firm on our team that will review not only the design of the bridge, but also the construction sequence. ASA Consultants have been included as part of the EAC Team to perform an independent peer review for the pedestrian bridge design plans. Adjacent Project Coordination The following FDOT projects have been identified in the area. Item Description Work Mix Construction FY Amount $ 436525-1-52-01 SR-826 Sunny Isles over Intracoastal WTWY Bascule BR 870592/0593 Bridge-Repair / Rehabilitaiton 2021 8,443,973 436525-2-52-01 SR-826 Sunny Isles Blvd. from NE 35 Avenue to SR A1A Collins Avenue Resurfacing 2021 2,130,726 FDOT’s Construction Start is July 2021 for these projects. The construction schedule includes 550 Calendar Days, and approximately 450 Construction Days. We anticipate these projects will be finalized before the construction of the Pedestrian Bridge at 174th Street begins. We will monitor these projects closely to ensure that there are no impacts to the construction of these projects and the proposed pedestrian bridge park, as well as to minimize any impacts to the traveling public. Communications Management Plan Efficient teamwork can only be achieved through communication. The Project Manager and EAC Team will enforce open communication lines throughout assigned projects. We will maintain a proactive management philosophy, ensuring that we communicate clearly with the City and maintain strict coordination within our team. Project communications include internal communications with our Project D-39 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA D Bridge Concept Development Design Development and 30% Plans Team; City staff, personnel, and departments; as well as permitting and jurisdictional agencies. Verbal and written communication will be precisely documented and properly filed. The EAC Team relations approach includes: • Coordination with the City of Sunny Isles Beach - Partnership will be fostered between our team and the City, and this will be reflected in the delivered product as well as the perception of the service provided. • Coordination with the Community (Residents and Stakeholders) - The EAC Team has extensive experience providing public outreach on infrastructure projects for municipalities in Miami-Dede County. We will coordinate with the City to use the City’s social media and publications to keep residents informed. • Coordination with the Project Team - As a team, we have in place both an internal and external communications plan which allows for secure transfer of information, project knowledge, data, and relevant feedback - allowing for successful coordination on all work order assignments. The tools include virtual meetings (until further notice due to COVID-19), face- to-face meetings as needed, e-mails, conference calls, and the use of shared file spaces such as our SharePoint sites. Project Milestones and Deliverables The EAC Team will focus on implementing all the tasks outlined below - utilizing an efficient, results-oriented approach that has worked on our prior professional service agreement contracts. We will design the project using FDOT Design Plans and Standards, Miami- Dade County Standards, City of Sunny Isles Beach Codes, and Resolutions and Ordinances and State of Florida Building Codes - to best achieve the project goal of providing a safe pedestrian bridge park that accommodates pedestrian, bicyclist, and traffic needs, while improving access to businesses and properties. The project milestones and deliverables are as follows: •Scope Clarification •Staff Hour/Fee Estimate Notice to Proceed •Project Kick-off Meeting •Schedule Discovery •OA/QC Plan •Utility Kick-Off Meeting Data Collection •Architecture •Landscape Architecture •Survey •Geotechnical •Environmental •Develop Concept from Vision •Preliminary Cost Estimate •Life Cycle •Costs/Maintainability Analysis Design Criteria •Typical Section Package •Variations and Exceptions •Pavement Design Package •Initial Bridge Development Report •(BDR) •Permit Involvement Form (PIF) •Conceptual Drainage Report •LRE Update/Scope History •R/W Coordination Plans Submittal •30% Plans •BDR / 30% Bridge Plans •30% Architectural and Landscape Architectural Plans Task 2 Task 3Project InitiationTask 1 D-40 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA D Design Development and 60% Plans Design Development and 100% Plans 100% Construction Plans and Bidding Documents Construction ManagementServices Post-Design (Upon Request) Final Engineering •Final Engineering •Permits Required Memo (PRM) •Final BDR Approved •Approved Typical Section Package & Pavement Design •Utility Design Conference •Cost Estimate/LRE •Permits Pre-Application Mgt. Upload •Pay Items in AASHTOWARE •R/W Mapping •Public Workshop for Design •Final Drainage Report •Final Geotechnical Report Plans Submittal •60% Plans •60% Architectural and Landscape Architectural Plans •Permits Transmittal Memo •Railroad Clear letter •Utility Work Schedules •Utility Certification Memo •PS&E Field Review •Quantities •Modified & TechnicaI Special Provisions •Engineer’s Cost Estimate •Construction Days Estimate •Construction Time Estimate (CTE) Memo •Final Cost Estimate •Contamination Impact Certification •Permits Issued •Environmental Certification •R/W Certification •Specifications Package Final Plans •100% Plans •Contamination Impact Certification •Bid Tabs for Contractor Bid Tabulation •Approved 100% Technical Specs •Approved 100% Signed and Sealed Plans •Approved 100% Design Calculations *If there is Federal Dollars, CEI can not be provided only Post Design Services •Pre-Construction Meeting •Design Support •RFls •Plan Revisions •Shop Drawing Review •Field Review Task 4 Task 5 Task 6 Task 7 The City of Sunny Isles Beach will provide Notice to Proceed to the EAC Team. Project InitiationTask 1 Bridge Concept Development Task 2 The first step to this project is to fully understand the needs of the City of Sunny Isles Beach and the community. Our Team will undertake master planning and public involvement, initiated upon NTP, to coordinate the design approach and facilitate an effective public communications plan. The Project Bridge Development Planning phase will be completed in compliance with all applicable federal, state, and local laws, rules, and regulations. From the very beginning of the project, an open and collaborative planning process will enable the team to creatively work in partnership with the public and regional and local agencies to help identify and address the area’s needs and any potential complications and conflicts early in the design process. The EAC Team will evaluate and propose viable design alternatives for the proposed pedestrian bridge concept, and develop a cost feasible sustainable concept that meets the City’s vision. We will perform an engineering and architectural design analysis that considers structural integrity and safety, resiliency, maintainability and life cycle costs, constructability and MOT, other costs, and aesthetics. We will assess the environmental impacts and consider public and stakeholder concerns. Design Development and 30% Plans Task 3 An integrated approach of engineering and architectural concepts will ensure that overall, the project will successfully balance the function of the proposed pedestrian bridge park within the area and the needs of the community. Based on the selection of a Preferred Alternative, the EAC Team will develop a preliminary project design that will provide safe pedestrian and bicycle access over Collins Avenue at 174th Street. In this task the EAC Team will submit a complete set of 30% plans to the City of Sunny Isles Beach staff for review and comment. The EAC Team will meet with the City of Sunny Isles Beach staff and discuss the 30% submittal review comments for further design development to be incorporated in the 60% design phase. D-41 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA D Design Development and 60% Plans Design Development and 100% Plans 100% Construction Plans and Bidding Documents Task 4 Task 5 Task 6 Based on the 30% review comments and direction from the City of Sunny Isles Beach, the EAC Team will further develop the project design. The EAC Team will meet with the City of Sunny Isles Beach staff and discuss the 60% review comments for further design development to be incorporated in 100% design phase. Based on the 60% review comments and direction from the City of Sunny Isles Beach, the EAC Team will finalize the project design. Afterward, the EAC Team will meet with the City of Sunny Isles Beach’s staff to discuss the 100% review comments for final construction plans. The EAC Team will prepare all necessary permit application packages to be provided to all applicable and regulating agencies. The EAC Team will also meet with the City of Sunny Isles Beach’s staff and address any comments needed to obtain approvals from the reviewing agencies. The City of Sunny Isles Beach will be responsible for all permit application fees. The EAC Team will finalize all construction plans and issue signed and sealed plan sets for the City of Sunny Isles Beach’s records. The EAC Team will assist the City of Sunny Isles Beach in preparing close-out bidding documents. Construction ManagementServices Post-Design (Upon Request)Task 7 The EAC Team will assist the City of Sunny Isles Beach with Construction Management Services, upon request. D-42 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA D Evaluation Criteria Criteria Met Professional Qualifications, the respondent shall be licensed to do business in the State of Florida. Specific project experience relating to bridges, and experience with FDOT. The EAC Team is licensed to do business in the State of Florida. Specific project experience includes FDOT projects that have been included as part of our qualifications package. Our team has previous working relationships with each other and with the FDOT. Most importantly we have the expertise and proven performance providing the services required on this project to the FDOT and other agencies. EAC is FDOT certified to provide Minor to Major Bridge Design in steel, concrete, or segmental concrete - and we have successfully provided these services to the FDOT. Size of workforce, workload and availability of personnel EAC has an average workload and an overall staff of 89 professionals (which includes 28 PEs, 12 EIs and 18 CEI personnel). We have proposed key staff resources that are 100% available for this project. The resources at EAC are more than sufficient to exceed the performance requirements for this contract. Design Approach The Team’s design approach optimizes local construction practices, and efficiency of engineering and funds. Our design showcases the opportunity of this project to bring art, landscape, and infrastructure together in an iconic bridge expression - while serving as a crucial circulation link in the neighborhood. Financial stability and past record We have included our financials that clearly demonstrate our stability as part of the qualifications package. Ability to complete project within proposed schedule and within budget The firms on the EAC Team have been carefully selected to ensure that they can align themselves with EAC’s goal - to provide engineering excellence and exceptional client services while delivering the project within schedule and budget. The staff leading the team are talented professionals with the experience to get the job done. Quality, Sensitivity to Schedule, and Attention to Budget will be the mindset of our Project Team. Is firm or sub-consultant a certified minority business enterprise EAC is a State of Florida certified Minority Business Enterprise (MBE). We have also included as part of our team Women Business Enterprises (WBEs) and Disadvantaged Business Enterprises (DBEs). References The EAC Team consists of sub-consultant firms who collectively have been working with FDOT for many years. EAC and our sub-consultants have built strong relationships based on quality performances. Our qualifications package includes client references that can attest to each firm’s superior performance. EVALUATION CRITERIA SUMMARY To facilitate the review of our qualifications package, we have prepared a summary to highlight our team’s unique qualifications in accordance with the City of Sunny Isles Beach’s Evaluation Criteria. We are confident that our team will exceed the City’s expectations. 9 Former FDOT District 6 Director as Principal In Charge 9 Local Team Expertise and strong bridge sub for Peer Review 9 Experienced Design Architect 9 Local Award Winning Landscape Architecture 9 Local Agency Program (LAP) Experience and Familiarity with Federal Funding Opportunities THE EAC Consulting, Inc. eacconsult.com TEAM... EAC Consulting, Inc. eacconsult.com GLOB COMM, LLC MAKING YOUR vision A reality! E. QUALIFICATION INFORMATION AND ASSIGNED PERSONNELQUALIFICATION INFORMATION AND ASSIGNED PERSONNELe E-13 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA E FINANCIAL STABILITY Financial stability (Include three years audited or reviewed financial statements, prepared by a C.P.A.) Refer to Tab E “Attachments” Per Florida Statutes Section 119.071(1)(c) financial statements constitute confidential information and are exempt from public disclosure. E-1 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA QUALIFICATION INFORMATION AND ASSIGNED PERSONNEL FIRMS/ROLE QUALIFICATIONS SUMMARY RELEVANT EXPERIENCE EAC Consulting, Inc. Prime Project Management, Bridge & Roadway Design, Design Criteria Development, General Civil Engineering, Planning, CEI, and Electrical EAC makes client service and engineering excellence a priority. EAC has significant experience in Structures, with expertise in:  Pedestrian Bridge Design  Minor Bridge Design  Major and Complex Bridge Design  Concrete Major and Complex Bridge Design  Steel Structures Bridge Design  Roadway Design and Maintenance of Traffic  Drainage Design  Planning  Civil Engineering Design  Electrical/Lighting Design  Hard Rock Pedestrian Bridges, City of Miami Gardens  Golden Glades Multimodal Transportation Facility Pedestrian Bridge  Snake Creek Pedestrian Bridge, City of North Miami Beach  NW 21st Street Avenue Pedestrian Bridge over C-13 Canal, Broward County  Meridian Avenue Bridge over Collins Canal, FDOT D6  Metro Zoo Aviary, Miami-Dade County Parks and Recreation Department  Venetian Causeway Bridges, FDOT D6  Virgin Trains US-Florida Miami Station Rail Infrastructure and Rail Viaduct  Port of Miami North Cruise Blvd. Steel Girder Bridge, Extension Phase III Miami-Dade County  I-75/I-595 Interchange Bridges, FDOT D4  FDOT D6 Golden Glades Interchange, Segment 4, Bridge 4  Tamiami Trail/ SR90 1 Mile Bridge  MDX General Engineering Consultant Bridge & Miscellaneous Structures Plans Review FDOT Work Types: 2, 3.0, 3.1, 3.2, 3.3, 4.0, 4.1.1, 4.1.2, 4.2.1, 4.2.2, 4.2.3, 5.0, 5.1, 5.4, 6.0, 6.1, 6.3.1, 6.3.1, 6.3.3, 7.0, 7.1, 7.2, 7.3, 10.0, 10.1, 10.3, 10.4, 11.0 E Industry Leaders... we are a qualified locally headquartered business, exceptionally experienced and knowledgeable, with available local staff and resources to undertake these services. EAC Consulting, Inc. (EAC), was incorporated in Miami-Dade County in 1994 as a bridge engineering firm. Founded by Enrique “Rick” Crooks, PE, EAC Consulting, Inc. has built its reputation over the past 26 years as a leading engineering firm in Florida by providing engineering solutions to public and private clients. With offices throughout South Florida, including Miami and Fort Lauderdale, EAC provides engineering services that include: Highway and Bridge Design, Program Management, Construction Management, Tolling and Intelligent Transportation Systems (ITS), Planning. Civil Design, and Transit/ Public Transportation and Systems Engineering. Since our beginning as a bridge engineering firm, we have branched out into other service areas, but our bridge department remains central to the company - and is one of the top ranked bridge departments in Miami- Dade County and the State of Florida. EAC has assembled a diverse team of dedicated engineers, and other professionals, who are committed to the goals of quality, client service and excellence. EAC is the ideal selection to provide the services on RFQ No. 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements across A1A at 174th Street. The EAC Team EAC has assembled an exceptional group of firms into a dynamic team of local professionals that are strongly committed to delivering professional engineering services to the City of Sunny Isles Beach. EAC as prime consultant, is the anchor of the team. This team collectively possesses significant local and State experience in similar bridge engineering contracts, and will best serve the needs of the City. Our team brings unsurpassed local experience in partnering with the City as it continues its strategic vision. Some of our team member firms and designated staff are well known to the City of Sunny Isles Beach, and have been trusted in the delivery of important projects and assignments for FDOT, Miami-Dade County, and other municipalities. The EAC Team is unsurpassed in its experience in pedestrian bridge structures and highway design, and will assist in developing design and construction plans for the City of Sunny Isles Beach. Below is a summary of the team qualifications: E-2 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA E FIRMS/ROLE QUALIFICATIONS SUMMARY RELEVANT EXPERIENCE Savino and Miller Design Studio Sub-consultant Bridge Architecture and Landscape Architecture Savino & Miller Design Studio began in 1985 with the partnership as a collaborative approach between architecture and landscape architecture in the creation of outdoor spaces. Their qualifications include landscape architecture, planning, urban renewal, lighting, public facilities, recreational facilities, and sustainable design. SMDS’s mission is to improve the quality of life through design, and understanding of the interaction of the urban with the natural world. As shapers of the spatial environment, they hope to create meaningful experiences and joy in our shared communal lives and private moments of solitude as people interact with spaces. The focus is to design spaces that reflect their location and intention and desire of those who will use them. SMDS has a comprehensive understanding of South Florida’s natural, human, and cultural ecology and the challenges of climate change, resiliency, and sustainability impacting the area. These challenges demand flexibility and a multidisciplinary approach to create solutions. As important to the approach is the role that the community and stakeholders play on public projects. Therefore, Savino & Miller believes that including the community is vital in activating the public realm.  Aventura Optima, Optima International LLC  Museum Park, City of Miami  South Pointe Park, City of Miami Beach  Belle Isle Streetscape & Park, City of Miami Beach  Sunny Isles Gateway Park, City of Sunny Isles  Sunny Isles City Hall, City of Sunny Isles  41st Street Bridge, City of Miami Beach  Miami River Landing, River Landing, LLC  Miami Baywalk and Riverwalk Design Guidelines, Miami Downtown Development Authority  Tamiami Canal Bridge and Tender House, Miami-Dade County FDOT Work Types: 14.0 and 15.0 FIRMS/ROLE QUALIFICATIONS SUMMARY RELEVANT EXPERIENCE West 8 Urban Design & Landscape Architecture Sub-consultant Bridge Architecture and Landscape Architecture West 8 is an award-winning urban design and landscape architecture firm. Founded in 1987, West 8 is nationally and internationally acclaimed for pioneering urban design, landscape and infrastructure projects. West 8 has realized more than three hundred projects in three decades. Many of the projects are the result of major international design competitions. With a multi-disciplinary approach to complex design issues, West 8 has extensive experience in large-scale urban master planning and design, landscape interventions, waterfront projects, parks, squares, and gardens. They opened their offices in New York after winning an international design competition in 2006 for the design of Governors Island Park - a 172-acre island in the New York Harbor. Amongst the numerous awards received by West 8 are the Global Award for Sustainable Architecture, the Honor Award of the American Society of Landscape Architects (ASLA), and the International Urban Landscape Gold Award (IULA).  Miami Beach Convention Center, Cultural District, Miami Beach  Pride Park, Miami Beach  Lowes Miami Beach, Renovation, Miami  1 Hotel South Beach, Renovation, South Beach  SoLe Miami Site Design, North Miami Beach  Crandon Park Masterplan, Key Biscayne  MBCC Vision & Streetscape Improvement, Miami Beach  Essex Crossing Pocket Park Design, New York City  The Shorebird Open Space and Landscape Design, Google’s North Bayshore, Sunnyvale, California  Governors Island Open Space and Park Design and the Hills, New York Florida Certified Architect and Landscape Architect E-3 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA E FIRMS/ROLE QUALIFICATIONS SUMMARY RELEVANT EXPERIENCE ASA Consultants, Inc. Sub-consultant Bridge & Roadway Peer Review  ASA has expertise in the full spectrum of structural design and several bridge types - from designing minor bridges to major bridges - including pedestrian bridges, curved structural steel and precast post- tensioned concrete members.  ASA is experienced in both preliminary and final design of a variety of bridge structures utilizing structural steel and precast post-tensioned concrete members.  Peer Reviews of Category 2 Structures, including four high-level segmental ramp bridges for SR 826/SR 836 Interchange Section 5 Design-Build FDOT D6.  I-95 3C Design-Build (FM #40935425201); structural EOR for five steel box girders for SR84 Interchange. FDOT Work Types: 3.0, 3.1,3.2, 4.0, 4.1.1, 4.1.2, 4.2.1, 4.2.2, 4.2.3, 5.0, 5.1, 5.4, 7.0, 7.1 FIRMS/ROLE QUALIFICATIONS SUMMARY RELEVANT EXPERIENCE LARS Engineering, Inc Sub-consultant Bridge Inspection  LARS has continuously worked with FDOT for the past decade and has inspected over 1500 Bridges in the State of Florida, including pedestrian bridges. They are knowledgeable of the latest inspection and reporting updates and techniques/procedures established by FHWA.  Unmatchable mixture of experience and dedication to guarantee the quality of work exceeds expectations.  Hard Rock Pedestrian Bridge No. 2 Inspection and Report, City of Miami Gardens  JFK Space Center Bridges Inspection, NASA  District-wide Local Government In- Depth Bridge Inspection, FDOT D6  Bridge Inspection and Reporting Services, Miami-Dade Expressway FDOT Work Types: 3.0, 3.1, 3.2, 3.3, 5.0, 5.1, 5.3, 7.0, 7.1, 7.2, 7.3 FIRMS/ROLE QUALIFICATIONS SUMMARY RELEVANT EXPERIENCE Choice Engineering Consultants, Inc. Sub-Consultant Traffic Engineering & Operations Studies and Traffic Operations Design  Specializes in Traffic and Transportation Engineering.  Provides design solutions in Traffic Engineering and Operations Studies, Traffic Safety Analysis, Traffic Operations Design (signing, pavement marking, and channelization), roadway lighting, and signalization.  Traffic Operations Studies, FDOT D6  Miscellaneous Studies & RCI Data, Miami-Dade  Traffic Operations/ Safety Studies, Miami-Dade  Traffic Operations /Safety Studies Consultant, Broward FDOT Work Types: 3.0, 3.1, 6.0, 6.1, 6.2, 6.3.1, 6.3.2, 6.3.3, 6.3.4, 7.0, 7.1, 7.2, 7.3, 13.0, 13.5, 13.7 FIRMS/ROLE QUALIFICATIONS SUMMARY RELEVANT EXPERIENCE Geosol, Inc. Sub-Consultant Soil Exploration, Material Testing and Foundations Provides geotechnical engineering and testing services including:  Subsurface exploration studies  Laboratory testing  Design of foundation systems  Reputation for providing high quality, creative and cost-effective geotechnical engineering solutions Participated as a Soils, Foundations and Materials Testing; sub-consultant in more than 500 major projects  Hard Rock Pedestrian Bridges, City of Miami Gardens  Pedestrian Bridge over SR 826 North of Bird Road, FDOT D6  Pedestrian Bridge over I-95 at NW 151st Street, FDOT D6  SR-5/US 1 Pedestrian Bridge over SR 878, FDOT D6  Pedestrian Bridge over Red Road and Okeechobee Road, FDOT D6 FDOT Work Types: 9.1, 9.2, 9.4.1, 9.4.2 E-4 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA E FIRMS/ROLE QUALIFICATIONS SUMMARY RELEVANT EXPERIENCE ASA Consultants, Inc. Sub-consultant Environmental Analysis and Permitting  Extensive environmental resource and permitting experience  Performed environmental support work for numerous NEPA/PD&E Studies  Design and permitting for major transportation improvement projects in Florida Department of Transportation (FDOT) Districts 4 and 6 as well as for the Miami-Dade County DTPW  Environmental Impact Studies/Assessments or Statements  Environmental Planning  Environmental and Natural Resource Mapping  Ecological/Archeological Investigations  Environmental Testing and Analysis  Kendall Drive Rapid Transit PD&E, Environmental Studies, Miami- Dade County  SR 25/ Okeechobee Road from Countyline to East of 117th Avenue, Environmental Permitting  Hialeah Gardens Warehouse Development Environmental Permitting and Florida Bonneted Bat Survey, Miami-Dade County  Doral White Course Mixed Use Development, Environmental, Florida Bonneted Bat and Tree Permitting Services, Miami-Dade County Florida Certified Environmental Engineering Firm FIRMS/ROLE QUALIFICATIONS SUMMARY RELEVANT EXPERIENCE M.G. Vera & Associates Sub-Consultant Surveying and Mapping and Utility Coordination MGV has been providing design survey and right-of-way mapping services to the Central and South Florida area for 45 years, servicing Miami-Dade County, local cities, and FDOT Districts 4 and 6 for 36 years, and the Florida Turnpike Enterprise for 25 years.  SR A1A / Collins Avenue at 174th Street Pedestrian Bridge, Sunny Isles Beach, FDOT D6  Pedestrian Bridge over Adams Cut, Key Largo, FDOT D6  Districtwide Right of Way Mapping & Survey, Miami-Dade and Monroe counties, FDOT D6 FDOT Work Types: 9.1, 9.2, 9.4.1, 9.4.2 FIRMS/ROLE QUALIFICATIONS SUMMARY RELEVANT EXPERIENCE TLC Engineering Solutions Sub-Consultant Surveying and Mapping and Utility Coordination TLC Engineering Solutions provides high-performance engineering design, consulting and energy services. Founded in 1955 and consistently ranked among the largest MEP and structural engineering firms in the country, TLC Engineering Solutions is an industry leader with extensive expertise.  City of Sunny Isles Beach Pelican Community Center  City of Miramar Police Headquarters  City of Miami Beach Parking Lots  City of Miami Springs Aquatic Facility FDOT Work Types: 5.1, 7.1 E-5 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA E NAME/ROLE/QUALIFICATIONS RELEVANT EXPERIENCE 100% Available Harold Desdunes, PE Principal-In-Charge 9 34 years of experience 9 Transportation Industry Leader 9 Expertise in Project Development, Traffic Engineering, Utilities, Right-of-Way Mapping, Design, Program Management, and Contract Procurement 9 Extremely familiar with all Stakeholders – FDOT, Locals, coordination with FDOT’s Central Office and FHWA Former FDOT District 6 Director as Principal-In-Charge. Mr. Desdunes understands the importance of planning and project management to maximize efficiency and returns on infrastructure investment. With 33 years at FDOT experience in managing a $4-Billion Work Program, Harold brings significant project management experience in planning, program management, project development and environment management, design and engineering, public involvement, right-of-way and utility coordination, construction engineering and inspection, project control, estimating, plans review, and quality assurance for transportation projects. In addition, his experience encompasses technical expertise for jurisdictional, public transportation, and permitting regulations associated with infrastructure projects. Mr. Desdunes has worked on various regional significant projects and over 300 transportation infrastructure projects in South Florida. Proposed Key Personnel To ensure that EAC’s standard of excellence is maintained on projects, EAC makes a determined effort to staff projects with professionals who have the expertise, availability, and commitment to deliver engineering excellence and exceptional service. EAC serves client needs with a staff strength of 89 professionals, including 28 Professional Engineers, 12 Engineering Interns and 18 Construction Inspectors- all located in the State of Florida. Our association with our sub-consultants provides over 200 professionals at the City’s disposal. At EAC we strive to utilize the right staffing expertise and modern technology (software and platforms) to improve performance and accuracy. The EAC Team is comprised of the following key personnel: E-6 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA E NAME/ROLE/QUALIFICATIONS RELEVANT EXPERIENCE 100% Available KT, Lin, PE, PhD. Project Manager & Bridge Structures Lead 9 34 years of experience 9 34 years of experience in Bridge Structural Design, Analysis, and Project Management 9 Major Bridge Experience - including, Segmental, Post- tensioned Concrete, Steel Boxes, Steel Plate Girder. Dr. Lin’s expertise includes structural analysis and design for a wide variety of concrete and steel bridge structures – including pedestrian bridges. He has managed several structural projects including FDOT projects. His expertise includes AASHTO, ACI, and AISC Design Codes, local and state criteria. He has been a Project Manager and Structures Design Lead for several highly recognized bridge projects in South Florida including:  Hard Rock Pedestrian Bridges, City of Miami Gardens  Golden Glades Pedestrian Bridge  Port of Miami Bridge  Miami Station Rail Infrastructure and Rail Viaduct, Brightline Trains  Venetian Causeway PD&E for Bridge Replacement of 12 Bridges NAME/ROLE/QUALIFICATIONS RELEVANT EXPERIENCE 100% Available Estephanie Romero Deputy Project Manager 9 14 years transportation engineering experience including movable bridges 9 Expertise in Bridge Design and Transportation Planning Ms. Romero has experience with Bridge Planning and Design, Technical Specifications, Cost Estimates, Engineering Reports, and Structural Inspections. She has served as Deputy Project Manager on several FDOT D6 Projects. Stephanie has been involved in highly recognized bridge projects in South Florida including:  FDOT D6 Venetian Causeway PD&E for Bridge Replacement for Miami-Dade County DTPW and FDOT  NW South River Drive Bridge over Tamiami Canal, FDOT D6 and Miami-Dade County  SR7/NW 5th Street Bridge, FDOT D6  Flagler Memorial Bridge SR A1A over ICWW, FDOT D4  Broad Causeway Bridge Rehabilitation, Town of Bay Harbor  Port Miami / FEC Railroad Bridge over Biscayne Bay, Port Miami/FEC E-7 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA E NAME/ROLE/QUALIFICATIONS RELEVANT EXPERIENCE 100% Available Abid Hadrous, PE Bridge Structures 9 37 years Transportation Engineering and Structures Design 9 Expertise includes Post-Tensioned Concrete, Concrete Segmental Bridges, long span continuous Steel Plate and Box Girder Bridges, convention minor bridge structures; FIB, AASHTO Girder, CIP Flat Slab and Miscellaneous Structures Mr. Hadrous’ Major Bridge design experience includes Post-Tensioned Concrete, Concrete Segmental Bridges, long span continuous Steel Plate and Box Girder Bridges. Mr. Hadrous also has extensive experience in the design of conventional / minor bridge structures (e.g., Florida-I Beam, AASHTO Girder, C.I.P. Flat Slab), and miscellaneous structures. He has been a key designer for some of the highly recognized bridge projects in South Florida including:  Hard Rock Stadium Pedestrian Bridges  Port of Miami Bridge  I-75/I-595 Interchange Bridges  I-95/Palm Beach International Airport Interchange  Ft. Lauderdale/Hollywood International Airport Interchange  MDX 83628/ Widening of SR 836 from West of NW 57th to NW 17th Avenue - Concept Plans development for 20+ bridge widening and 11 new bridge ramps. NAME/ROLE/QUALIFICATIONS RELEVANT EXPERIENCE 100% Available Dinesh Dagly, PE Bridge Structures QA/QC 9 51 Years of Structures Design 9 Expertise includes Post-Tensioned Concrete, Concrete Segmental Bridges, long span continuous Steel plate and Box Girder Bridges, convention minor bridge structures; FIB, AASHTO Girder, CIP Flat Slab and Miscellaneous Structures Mr. Dagly has 51 years of experience in the structural design of highway bridges, as well as elevated and underground mass transit structures. He has many years of experience working in FDOT projects involving preparation of specifications packages, post design services, and construction support. Reviewer for the following major projects:  MDX 836-11 Design-Build SR-836, I-395 and I-95 South Bound to SR 836 Westbound - review of 19 new and widened bridges  Design-Build SR 836 Operational, Capacity and Interchange Improvements from West 57th Ave to 17th Ave (MDX) – Over 30 bridges, new widenings at nine intersection roads and canal crossings. Project Manager / Structural Designer for the following major projects:  Hard Rock Pedestrian Bridges  Port of Miami Bridge  I-95 and Spanish River Boulevard Interchange  Ft. Lauderdale/Hollywood International Airport Interchange E-8 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA E NAME/ROLE/QUALIFICATIONS RELEVANT EXPERIENCE 100% Available Jenner Alfaro, PE Constructability QA/QC 9 43 years of construction experience Qualifications: - FDOT Advanced MOT CTQP Certifications: - QC Manager - Asphalt Paving Level II - Asphalt Paving Level I - Final Estimate Level II - Final Estimate Level I - Drill Shaft Inspection - Pile Driving Other: - FDOT Self Study: Critical Structures - Construction Issues Mr. Alfaro has 43 years of experience and has managed multi-disciplinary teams locally, nationally and internationally including South Florida, Latin America and the Caribbean that include several high profile infrastructure projects. Jenner has successfully delivered projects in Miami-Dade County working in construction and Construction Engineering & Inspection of diverse limited access projects for Miami-Dade Expressway Authority (MDX), Miami-Dade Transit (MDT), DTPW and Florida Department of Transportation District 6 and District 4 projects. He has performed as Construction Project Manager/ Senior Project Engineer for the following projects:  SR-836/I-395 Interim Project from NE 1st Avenue to MacArthur, FDOT D6  GEC Construction Management Services – Miami-Dade Expressway Authority  SR 836 Design/Build (MDX 83622) – Bridge Widenings, Miami-Dade Expressway Authority  NW 105th Way Bridge – Emergency Repair from US 27 (Okeechobee Road) to N.W. South River Drive, Town of Medley and FDOT D6 NAME/ROLE/QUALIFICATIONS RELEVANT EXPERIENCE 100% Available Soheila Sadough, PE Bridge Structures Peer Review 9 32 Years in Structural Design 9 Expertise includes Post-Tensioned Concrete, Concrete Segmental Bridges, long span continuous Steel Plate and Box Girder Bridges, convention minor bridge structures Ms. Sadough’s experience ranges the full spectrum of civil engineering. Her structures related experience ranges from curved structural steel to precast post- tensioned concrete members. Her significant design contributions have encompassed all project phases, from preliminary design and Bridge Development Reports to final design, peer review, value engineering, and post design services. Structural Reviewer and Designer for the following major projects:  Peer Reviews of Category 2 Structures, including four high-level segmental ramp bridges for SR 826/SR 836 Interchange Section 5 Design-Build FDOT D6  I-95 3C Design-Build (FM #40935425201); structural EOR for five steel box girders for SR84 Interchange E-9 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA E NAME/ROLE/QUALIFICATIONS RELEVANT EXPERIENCE 100% Available Adriana Savino, AIA Architecture 9 30 Years’ experience 9 Award-winning master planning projects Mrs. Savino experience ranges from Urban Design, Architecture, Regional Planning to Landscape Architecture. Her proficiency includes the following:  History of multidisciplinary collaboration  Improve site plan and connections to urban fabric through integration of urban design and architecture  Emphasis on resiliency and sustainability as it relates to material selection and efficient design Architectural Designer for the following Projects:  Aventura Optima, Optima International LLC  Museum Park, City of Miami  South Pointe Park, City of Miami Beach  Belle Isle Streetscape and Park, City of Miami Beach  Sunny Isles Gateway Park, City of Sunny Isles  Sunny Isles City Hall, City of Sunny Isles NAME/ROLE/QUALIFICATIONS RELEVANT EXPERIENCE 100% Available Daniel Vasini, ASLA Architecture 9 14 years of experience 9 Award-winning architecture projects 9 Pinnacle Award of Excellence, Public Landscapes, Parks and Memorials, Drexel Square 9 ULI- New York Awards for Excellence for best Civic Space, New York Mr. Vasini leads creative thinking in the conceptualization of projects that advance design research, aesthetics and operational standards. His leadership builds upon an interrogation of contemporary culture and urban identity, landscaping public spaces and engineering. His expertise includes the following:  History of multidisciplinary collaboration  Understanding of regional, local, site-specific issues  Emphasis on sustainability and resiliency as it relates to plant selection, materials and green infrastructure Completed Projects:  North Shore Open Space Park, Park design, Miami Beach  Crandon Park Masterplan Analysis  MBCC Vision and Streetscape Improvement, Miami Beach  Pride Park Design, Miami Beach  Roosendall Pedestrian Bridge, Roosendaal, The Netherlands  Webduine Pedestrian Bridge, Wenduine, Belguim, E-10 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA E NAME/ROLE/QUALIFICATIONS RELEVANT EXPERIENCE 100% Available Barry Miller, ASLA Landscape Architecture 9 35 years of experience 9 Award-winning landscape architect  Previous experience in Sunny Isles (City Hall and Gateway Park)  History of multidisciplinary collaboration  Understanding of regional, local, and site-specific issues  Emphasis on sustainability and resiliency as it relates to plant selection, materials and green infrastructure Architectural Design for:  Aventura Optima, Optima International LLC  Museum Park, City of Miami  South Pointe park, City of Miami Beach  Belle Isle Streetscape & Park, City of Miami Beach  Sunny Isles Gateway Park, City of Sunny Isles  Sunny Isles City Hall, City of Sunny Isles NAME/ROLE/QUALIFICATIONS RELEVANT EXPERIENCE 80% Available Adriaan Geuze, AIA, ASLA Architecture and Landscape Architecture 9 35 years of experience 9 Award-winning landscape architect 9 ASLA NY Honor Award 9 Harvard GSD 12th Veronica Rudge Green Prize in Urban Design 9 Veronica Rudge Green Prize for Urban Design - Harvard Design Mr. Geuze is internationally acclaimed for his pioneering urban design, landscape and infrastructure projects. Many of his projects are part of major international design competitions, including those for Governors Island in New York, Madrid Rio, Yongsan Park in Seoul and the waterfront of Toronto in CA. He has received many awards for his work, including the Prix-de-Rome, the Maaskant Prize, the Oeuvre Prize for Architecture of the Mondriaan Fund, the Architect of the Year Prize (with Team CS) and the ARC Oeuvre Award. International prizes are the Rosa Barba First European Landscape Prize, the Veronica Rudge Green Prize for Urban Design (Harvard Design School) and various Honor Awards from the American Society for Landscape Architecture. Completed Projects:  Miami Beach Convention Center, Cultural District, Miami  Roosendall Pedestrian Bridge, Roosendaal, The Netherlands  Webduine Pedestrian Bridge, Wenduine, Belguim E-11 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA E NAME/ROLE/QUALIFICATIONS RELEVANT EXPERIENCE 100% Available Luz Urbaez Weinberg Lead Public Involvement 9 15 Years of Experience 9 Former City of Aventura Commissioner, 2005 to 2014 9 Construction Impact Mitigation Specialist  Successful delivery of strategic, pro-active public information approach with effective, support-garnering solutions in high-profile, large-scale construction projects, as well as smaller projects addressing issues impacting the schedule, budget, client, stakeholders, and the general public.  Gubernatorial Appointee, Miami-Dade Expressway Authority Board - 2013 to Present Projects Completer  Port of Miami Tunnel (2010 – 2014 Opening)  Brickell City Centre (2013 Start – 2016)  Site C (Dam) Clean Energy, BC, Canada  Ransom Everglades Prep School STEM Building  Esplanade at Aventura (former Sears) 2017 to present.  Shoppes at Westland Mall – 2019 to present. NAME/ROLE/QUALIFICATIONS RELEVANT EXPERIENCE 100% Available Gisele Colbert Environmental Lead 9 26 years of experience Experience in environmental permitting, agency coordination, wetland jurisdictional determinations and mitigations assessments, wetland monitoring, benthic resource surveys, natural resources management, threatened and endangered species studies, habitat evaluation, and contamination. Ms. Colbert has provided land planning consulting services for the development of Land Management plans and Stewardship Reports for Miami-Dade County Parks, Recreation and Open Spaces Department. Completed Projects:  Kendall Drive Rapid Transit PD&E, Environmental Studies, Miami-Dade County  SR 25/ Okeechobee Road from Countyline to East of 117th Avenue, Environmental Permitting  Hialeah Gardens Warehouse Development Environmental Permitting and Florida Bonneted Bat Survey, Miami-Dade County ARCHITECT - ENGINEER QUALIFICATIONS PART I - CONTRACT-SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1. TITLE AND LOCATION (City and State)Professional Engineering And Architectural Services For Pedestrian Bridge With Park Elements Across A1a At 174th St. CCNA 4. NAME AND TITLE B. ARCHITECT-ENGINEER POINT OF CONTACT K.T. Lin, PhD, PE, Project Manager 5. NAME OF FIRM EAC Consulting, Inc. 6. TELEPHONE NUMBER 305-265-5400 7. FAX NUMBER 8. E-MAIL ADDRESS klin@eacconsult.com C.PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors.) (Check) 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT PRIME J-V PARTNERSUBCON- TRACTORa. ✔ EAC Consulting, Inc. CHECK IF BRANCH OFFICE 5959 Blue Lagoon Drive, Suite 410 Miami, FL 33126 Prime-Highway Design Roadway, Highway Design Bridges, Lighting b. ✔ Savino and Miller Design Studio CHECK IF BRANCH OFFICE 12345 NE 6th Avenue North Miami, FL 33161 Architecture and Landscape Architecture c. ✔ West 8 Urban Design & Landscape Architecture CHECK IF BRANCH OFFICE 33 Hudson Street, suite 905 New York, NY 10013 Architecture and Landscape Architecture d. ✔ ASA Consultants, Inc. CHECK IF BRANCH OFFICE 510 Shotgun Road, Suite 402 Sunrise, FL 33326 Structural Engineering/Bridge Design Review e. ✔ LARS Engineering, Inc. CHECK IF BRANCH OFFICE 7225 NW 25 Street, Suite 211 Miami, FL 33122 Bridge Inspection f. ✔ CHECK IF BRANCH OFFICE 12855 SW 132nd Street, Suite 200 Miami, FL 33186 Traffic Engineering & Operations Studies/Design D.ORGANIZATIONAL CHART OF PROPOSED TEAM AUTHORIZED FOR LOCAL REPRODUCTION (Attached) STANDARD FORM 330 (REV. 8/2016) 2. PUBLIC NOTICE DATE 11/02/2020 3. SOLICITATION OR PROJECT NUMBER 20-10-01-0-2020/mb Choice Engineering Consultants, Inc. ARCHITECT - ENGINEER QUALIFICATIONS PART I - CONTRACT-SPECIFIC QUALIFICATIONS A. CONTRACT INFORMATION 1. TITLE AND LOCATION (City and State) Professional Engineering And Architectural Services For Pedestrian Bridge With Park Elements Across A1a At 174th St. CCNA 4. NAME AND TITLE B. ARCHITECT-ENGINEER POINT OF CONTACT K.T. Lin, PhD, PE, Project Manager 5. NAME OF FIRM EAC Consulting, Inc. 6. TELEPHONE NUMBER 305-265-5400 7. FAX NUMBER 8. E-MAIL ADDRESS klin@eacconsult.com C. PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors.) (Check) 9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT PRIME J-V PARTNER SUBCON- TRACTOR a. ✔ Manny G Vera & Associates, Inc. CHECK IF BRANCH OFFICE 13960 SW 47th Street, Miami, FL 33175 Surveying b. ✔ GEOSOL, Inc. CHECK IF BRANCH OFFICE 5795-A NW 151st Street, Miami Lakes, FL 33014 Soils, Foundations & Materials Testing c. ✔ Smart-Sciences CHECK IF BRANCH OFFICE 330 SW 27th Avenue Suite 504 Miami, FL 33135 Environmental d. ✔ JANUS RESEARCH CHECK IF BRANCH OFFICE 1107 N. Ward Street Tampa, Florida 33607 Cultural Resources e. ✔ TLC Engineering Solutions CHECK IF BRANCH OFFICE 5757 Blue Lagoon, Suite 400 Miami, Florida 33126 MEP Services f. ✔ CHECK IF BRANCH OFFICE 481 Ives Dairy Road #203 Miami, FL 33179 Public Involvement D. ORGANIZATIONAL CHART OF PROPOSED TEAM AUTHORIZED FOR LOCAL REPRODUCTION (Attached) STANDARD FORM 330 (REV. 8/2016) 2. PUBLIC NOTICE DATE 11/02/2020 3. SOLICITATION OR PROJECT NUMBER 20-10-01-0-2020/mb (CONTINUED) GlobComm, LLC. RFQ 20-10-01 PROFESSIONAL ENGINEERING AND ARCHITECTURAL SERVICES FOR PEDESTRIAN BRIDGE WITH PARK ELEMENTS ACROSS A1A AT 174TH ST. CCNA CITY PROJECT MANAGER CLAUDIA C. HASBUN EAC Consulting, Inc. PROJECT MANAGER K.T.Lin, PE, PhD EAC The EAC Team EAC Consulting, Inc. EAC Prime Consultant Savino & Miller Design Studio SMDS West 8 Urban Design & Landscape Architecture P.C. Corp. W8 ASA Consultants, Inc. ASA LARS Engineering, Inc. LEI Choice Engineering Consultants, Inc. CEC Manny G Vera & Associates, Inc. MGV GEOSOL, Inc. GEO Smart-Sciences, Inc. SSI Janus Research JR TLC Engineering Solutions TLC GlobComm, LLC GC DEPUTY PROJECT MANAGER Stephanie Romero, PE EAC QUALITY CONTROL TEAM BRIDGES/STRUCTURES Dinesh Dagly, PE EAC CONSTRUCTABILITY Jenner Alfaro, PE EAC SECONDARY SUPPORT SERVICES PLANNING Enrique “Rick” Crooks, PE EAC Stephanie Romero, PE EAC Adriana Savino, AIA SMDS Barry Miller, ASLA SMDS QA/QC: David Gilpin-Hudson, AICP EAC BRIDGE DESIGN PEER REVIEWBRIDGES/STRUCTURES K.T.Lin, PE, PhD EAC Abid Hadrous, PE EAC Chun Li, PE EAC Ning Wang, PE EAC Hamid Anajafi , EI, PhD EAC QA/QC: Dinesh Dagly, PE EAC ARCHITECTURE / LANDSCAPE ARCHITECTURE Adriana Savino, AIA SMDS Barry Miller , ASLA SMDS Daniel Vasini , ASLA W8 Ashley Schwemmer, ASLA W8 Jose Fonseca, ASLA SMDS Kelly Hitzing, ASLA SMS SMDS QC: Adriaan Geuze, AIA, ASLA W8 HIGHWAY DESIGN ROADWAY / MAINTENANCE OF TRAFFIC Satiar Shirazi, PE EAC Shan Patel, PE EAC QA/QC: Cesar Quiroz, PE EAC DRAINAGE Shahin Shaquil, PE EAC QA/QC: Herman Tirado, PE EAC Soheila Sadough, PE ASA Raul Amaya, PE ASA Carlos Rodriguez, PE ASA KEY PERSONNEL PRIMARY WORK AREAS/DISCIPLINES/SERVICES PRINCIPAL-IN-CHARGE PUBLIC INVOLVEMENT Harold Desdunes, PE EAC Luz Urbaez Weinberg GC CULTURAL RESOURCES Kenneth Hardin JR Amy Streelman JR QA/QC: Kathleen Hoffman JR ENVIRONMENTAL ENGINEERING AND IRRIGATION DESIGN SOIL EXPLORATION, MATERIAL TESTING AND FOUNDATIONS TRAFFIC ENGINEERING & OPERATIONS STUDIES / TRAFFIC OPERATIONS DESIGN CIVIL ENGINEERING DESIGN Meike de Vringer, MS SSI Andrea Orozco, MS SSI QA/QC: Gisele Colbert, MS, LEP SSI Adnan Ismail, PE GEO QA/QC: Oracio Riccobono, PE GEO BRIDGE INSPECTION Adrian Leon, PE CBI LEI Loren Marquez, PE, CBI LEI QA/QC: Randy Suarez LEI MEP ENGINEERING LIGHTING Girish Thallapragada, PE EAC Richard Lopez EAC QA/QC: Ramon Borges, PE EAC ELECTRICAL ENGINEERING Ralph Baeza, PE TLC Manuel Mollinedo, PE TLC MECHANICAL/PLUMBING ENGINEERING Vincent McNish, PE TLC ELEVATOR SPECIFICATIONS Adriaan Geuze, AIA, ASLA W8 CONSTRUCTION ENGINEERING INSPECTIONS (CEI) Sergio Besu EAC Jeff LaBelle EAC QA/QC: Jenner Alfaro, PE EAC SURVEYING / MAPPING / SUE Mark R. Sowers, PSM MGV QA/QC: Manuel G. Vera, Jr., PSM MGV Huntley Higgins, PE, PMP EAC Evelyn Rodriguez, PE, ENV SP EAC Miguel Lockward, PE, ENV SP EAC QA/QC: Mike Adeife, PE, ENV SP EAC Rafael S. Aguilar, PE CEC Erik Echezal, PE, PTOE CEC Olsen Deronvil, PE CEC Horacio Lopez, PE CEC QA/QC: Winston Lucky, MSCE, EI, CGC CEC EAC Consulting, Inc. eacconsult.com GLOB COMM, LLC E-12 19.RELEVANT PROJECTS a. (1)TITLE AND LOCATION (City and State)Port of Miami Tunnel (Miami, FL) YEARS COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION 2014 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Responsibilities included coordination and management of staff and consultants on State and federally fAunded project designs for state roadways and bridges in Miami-Dade and Monroe Counties. Our office developed planning and project development and environmental studies to final contract plans for construction implementation. In addition, responsible for management of the traffic engineering, estimates, drainage, survey, R/W mapping, utilities, specification, quality assurance, structures, records and reproduction sections. Responsible for the district consultant staff hour negotiations committee and member of the supplemental agreement committee. Negotiated all professional services contracts for the Transportation Development Division worth more than $50,000. Responsible for coordination with local governments, FHWA and the public to ensure transportation projects comply with stakeholders. b. (1)TITLE AND LOCATION (City and State)SR 826/SR 836 Interchange (Miami, FL) YEARS COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION 2016 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firmResponsibilities included coordination and management of staff and consultants on State and federally funded project designs for state roadways and bridges in Miami-Dade and Monroe Counties. Our office developed planning and project development and eAnvironmental studies to final contract plans for construction implementation. In addition, responsible for management of the traffic engineering, estimates, drainage, survey, R/W mapping, utilities, specification, quality assurance, structures, records and reproduction sections. Responsible for the district consultant staff hour negotiations committee and member of the supplemental agreement committee. Negotiated all professional services contracts for the Transportation Development Division worth more than $50,000. Responsible for coordination with local governments, FHWA and the public to ensure transportation projects comply with stakeholders. c. (1)TITLE AND LOCATION (City and State)Tamiami Trail (Miami-Dade, FL) YEARS COMPLETED PROFESSIONAL SERVICES 2008 CONSTRUCTION 2013 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Responsibilities included coordination and management of staff and consultants on State and federally funded project designs for state roadways and bridges in Miami-Dade and Monroe Counties. Our office developed planniAng and project development and environmental studies to final contract plans for construction implementation. In addition, responsible for management of the traffic engineering, estimates, drainage, survey, R/W mapping, utilities, specification, quality assurance, structures, records and reproduction sections. Responsible for the district consultant staff hour negotiations committee and member of the supplemental agreement committee. Negotiated all professional services contracts for the Transportation Development Division worth more than $50,000. Responsible for coordination with local governments, FHWA and the public to ensure transportation projects comply with stakeholders. d. (1) TITLE AND LOCATION (City and State)Okeechobee Depressed Section (Hialeah, FL) YEARS COMPLETED PROFESSIONAL SERVICES 2004 CONSTRUCTION 2006 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Responsibilities included coordination and management of staff and consultants on State and federally funded project designs for state roadways and bridges in Miami-Dade and Monroe Counties. Our office developed planning and project development and environmental studies to final contract plans for construction implementation. In addition, responsible for management of the traffic engineering, estimates, drainage, survey, R/W mapping, utilities, specification, quality assurance, structures, records and reproduction sections. Responsible for the district consultant staff hour negotiations committee and member of the supplemental agreement committee. Negotiated all professional services contracts for the Transportation Development Division worth more than $50,000. Responsible for coordination with local governments, FHWA and the public to ensure transportation projects comply with stakeholders. e. (1)TITLE AND LOCATION (City and State)South Dixie Highway Reconstruction (Miami-Dade, FL) YEARS COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION 2013 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Responsibilities included coordination and management of staff and consultants on State and federally funded project designs for state roadways and bridges in Miami-Dade and Monroe Counties. Our office developed planning and project development and environmental studies 2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME:Harold Desdunes, PE 13.ROLE IN THIS CONTRACT:Principal-in-Charge 14.YEARS EXPERIENCE a.TOTAL: 34 b.WITH CURRENT FIRM: less than 1 15.FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 16.EDUCATION (Degree and Specialization): BS Civil Engineering, University of Miami 17.CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer: Florida – 43916 18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): to final contract plans for construction implementation. In addition, responsible for management of the traffic engineering, estimates, drainage, survey, R/W mapping, utilities, specification, quality assurance, structures, records and reproduction sections. Responsible for the district consultant staff hour negotiations committee and member of the supplemental agreement committee. Negotiated all professional services contracts for the Transportation Development Division worth more than $50,000. Responsible for coordination with local governments, FHWA and the public to ensure transportation projects comply with stakeholders. 2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME:Kuo Ting (K.T.) Lin, P.E., Ph.D. 13. ROLE IN THIS CONTRACT:Project Manager 14. YEARS EXPERIENCE a.TOTAL: 33 b.WITH CURRENT FIRM: 13 15. FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 16. EDUCATION (Degree and Specialization):1987 PhD Civil Engineering - University of Miami 1984 MSCE - University of Miami 1980 Bachelor of Science in Civil Engineering, National Taiwan University 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer: Florida – 41089 Professional Engineer: California – 49346 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): 19.RELEVANT PROJECTS a. (1)TITLE AND LOCATION (City and State)Hard Rock Stadium Pedestrian Bridges Design YEARS COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION 2020 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm EAC provided design services for the two pedestrian bridges substructures and for the MSE wall control drawings for the ramps at both bridge approaches. With a very aggressive schedule on this job, EAC was able to meet all of the design submittals deadlines. EAC is currently providing Post-Design services for the bridges and MSE walls related items. b. (1)TITLE AND LOCATION (City and State)Golden Glades Multimodal Transportation Facility YEARS COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION N/A (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firmStructures Lead for the Golden Glades Multimodal Transportation Facility (GGMTF), a design-build project for FDOT District-6, is currently under design and construction. The project is located in the southwest quadrant of the Golden Glades Interchange in northern Miami-Dade County and consists of two FDOT-owned Park and Ride (PNR) lots bordered by the South Florida Rail Corridor (SFRC) to the north, SR 9A (I-95)to the east, and NW 159th Street/Block to the south. The new integrated Multimodal Transportation Facility is intended to address theexisting deficiencies in multimodal connectivity, capacity and transfer efficiency, comfort and convenience, as well as safety and security. Theproject also intends to upgrade the overall aesthetics of the facility and increase visibility from the neighboring roadways to serve as a gatewayto Miami-Dade County. The proposed work includes the demolition of existing structures, design and construction of an at grade parking and amulti-story parking garage structure to support the new adjacent DTPW transit terminal, as well as a new elevated pedestrian bridge thatconnects the proposed parking garage structure to the existing Tri-Rail Bridge. c. (1)TITLE AND LOCATION (City and State)Downtown Government Center Station (All Aboard Florida) YEARS COMPLETED PROFESSIONAL SERVICES 2015- 2019 CONSTRUCTION 2019 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm EAC provided structural design services for the Miami Central Station Rail Infrastructure and Rail Viaduct, and also provided post-design support. The viaduct is an elevated guideway structure, built 50 feet above ground for AAF and Tri-Rail passenger trains. EAC collaborated with New York City architectural firm Skidmore, Owings, & Merrill (SOM) on the design of one of the viaduct’s most prominent features, the distinctive V-shaped columns which enhance the aesthetics and open layout of the station’s entrance. In order to maintain the station’s high quality environment, EAC’s design also employs context-sensitive vibration impact mitigation, which would prevent train vibration from spreading into the station area. As an integrated component of the Miami Central Station, the design of the viaduct is an example of the sensitive balance of aesthetic form and function. d. (1)TITLE AND LOCATION (City and State)Port of Miami North Cruise Blvd. Extension Phase III Miami-Dade County, FL YEARS COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION N/A (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Engineer of Record for structural design of a two span continuous curved steel plate girder bridge with a skew angle of approximately 40 degrees. Weathering steel Grade 70W is utilized for the girders, which will be painted due to aggressive coastal conditions. To achieve cost saving and minimize impact to existing cruise terminals, augercast piles are proposed using FDOT developmental specifications. Due to complexity of the bridge, refined structural methodology using grid analysis was performed. e. (1)TITLE AND LOCATION (City and State)Tamiami Trail/SR90 – Miami-Dade County, FL YEARS COMPLETED PROFESSIONAL SERVICES 2007- 2014 CONSTRUCTION 2014 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Structural Engineer of Record for the design of a 1-mile long bridge. The bridge has a typical span of 80 feet, with a superstructure utilizing AASHTO Type IV beams and a substructure consisting of and 24-inch square pre-stressed concrete piles. The project was designed on an accelerated schedule and completed in 6 months. Post-design services included shop drawings review, RFI, and construction assistance 19.RELEVANT PROJECTS a. (1)TITLE AND LOCATION (City and State)PD&E Study for Venetian Causeway – FDOT District 6 YEARS COMPLETED PROFESSIONAL SERVICES 2014- Present (5 years) CONSTRUCTION NA (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm The project requirements include the inspection of the bridges, engineering reports, environmental documents, a Section 4(f) document and preliminary plans. Assistant Project Manager and Structural Engineer responsible for conceptual Structural Analysis and design of the ten low- level fixed span bridges, preparation of Preliminary Engineering Report study documents, public involvement workshops and activities, and coordination with sub-consultants and agencies. The Venetian Causeway bridges (ten low-level fixed spans and two movable bascules) from North Bayshore Drive in Miami to Purdy Avenue in Miami Beach were originally built in 1926 and have been designated as historic landmarks by the City of Miami and City of Miami Beach; they are also listed on the National Register of Historic Places (NRHP). Extensive public involvement efforts are being done as part of this study. The PD&E study will look at alternatives that satisfy the public; protect the environment; are sensitive to the historic designation; result in bridges that are safe, maintainable and serve the needs of the public. b. (1)TITLE AND LOCATION (City and State)Additional Elevators and Overhaul at the Dadeland North Metrorail Station Parking Garage - DTPW, Miami-Dade Transit YEARS COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION NA (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Lead Engineer Project consisted of the Design-Build RFP Development. Responsible for project management tasks, structural inspection, preparation of construction documents and specifications, cost estimating, and engineering support services. The Design-Build RFP development included Design and Construction Requirements, Construction Technical Specifications, and Conceptual Design Plans for the new elevator tower on the northern end of the existing parking garage, a new prefabricated Bus Operator Supervisor’s booth, a new canopy along the eastern side of the existing parking garage; modernization of existing elevators; and the overhaul and renewal of the existing parking. The project included extensive coordination with Miami-Dade Transit and DTPW facilities to meet all design and construction requirements. c. (1)TITLE AND LOCATION (City and State)NW South River Drive Bridge over Tamiami River Canal - Miami-Dade County YEARS COMPLETED PROFESSIONAL SERVICES 2010 – 2014 (4 years) CONSTRUCTION 2014 - 2019 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Preliminary Study and Final Design of a 123-foot simple trunnion single leaf through-girder bascule span bridge to replace the Tamiami Canal Historical Swing Bridge constructed in 1921. The project includes providing a 4 lane wide bridge with 6 foot and 12 foot shared sidewalks and control house within a 50 foot limited right-of-way and low bridge profile which resulted in the need to use through-bascule girders. The floor system consists of floor beams and an exodermic bridge deck with no steel stringers and lateral bracing. Architectural features to the bridge and control house are also included in the detail design. Structural Engineer responsible for the design of the single leaf bascule span bridge steel plate bascule floor-beams, design and detailing of the rest pier which includes pile, wall design, design and detail of seawall, quantities and cost estimate of finished project. d. (1) TITLE AND LOCATION (City and State)Flagler Memorial Bridge SR A1A over ICWW - FDOT District 4 YEARS COMPLETED PROFESSIONAL SERVICES 2011-2014 CONSTRUCTION 2018 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm $95 million Design/Build contract to replace twin double leaf bascule span bridge with a 150’ rolling lift span over the navigable channel, 12- 150 foot pre-stressed concrete approach spans and approach roadway work. Project maintains traffic on existing bridge during construction of the new bridge. Structural Engineer responsible for approach substructure design (bascule pier walls, columns and beams) and abutment design including concrete monument support structure on drilled shaft foundations. Structural Engineer responsible for LRFR bridge load ratings for cast-in-place reinforced concrete slabs. e. (1) TITLE AND LOCATION (City and State)Sunny Isle Bascule Span Retrofit, Dade County, FL - FDOT District 4 YEARS COMPLETED PROFESSIONAL SERVICES 2007 CONSTRUCTION 2008 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Mathematical balance and dynamic strain gage measurement to determine bascule span balance condition for this four leaf bascule span bridge. Structural Engineer responsible for plans development and assisting Project Engineer with load calculations. 2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME:Stephanie Romero, PE 13.ROLE IN THIS CONTRACT:Deputy Project Manager 14.YEARS EXPERIENCE a.TOTAL: 14 b.WITH CURRENT FIRM: 5 15. FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 16.EDUCATION (Degree and Specialization):2006 Bachelor of Science in Civil Engineering – New York University Polytechnic School of Engineering 17.CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer: Florida – 77593 18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): 19. RELEVANT PROJECTS a. (1)TITLE AND LOCATION (City and State)I-95 and Spanish River Boulevard Interchange – FDOT District 4; Palm BeachCounty, FL. (concrete bridge) YEARS COMPLETED PROFESSIONAL SERVICES 2014-2017 CONSTRUCTION 2014-2018 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm Senior Engineer responsible for plans preparation for a three (3) level Interchange at Spanish River Blvd. & I-95 in Boca Raton, Fl. This project included the construction of a new interchange, modification of the existing Yamato Road and I-95 interchange, addition of auxiliary lanes from Glades Road to Congress Avenue on I-95 and cross street improvements on Spanish River and Yamato Road. This third level interchange included coordination with Federal Aviation Administration (FAA), Boca Airport, City of Boca Raton, and Florida Atlantic University (FAU). This improvement provides connectivity between FAU, Tri-Rail, and I-95 and relieves daily congestion as well as event traffic generated during events held at the FAU stadium. b. (1)TITLE AND LOCATION (City and State)I-75/I-595/Sawgrass Interchange, Broward County, FL (Precast Segmental) - FDOT 4 YEARS COMPLETED PROFESSIONAL SERVICES 1985-1987 CONSTRUCTION 1987-1990 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm I was part of the design of substructure for 9 segmental bridges. Performed quality control of the superstructure of the segmental bridges for the phase two part of the project. This four-level, directional interchange of three of the most important transportation facilities in Broward County, Florida, was designed for staged construction. 14 of a total of 17 bridges have been designed as segmental concrete box girders. This is the largest (550 acres) interchange in Florida and has outstanding geometric features. c. (1)TITLE AND LOCATION (City and State)SR-9(I-95) Design-Build Bridge over Box Culvert South of 45th Street, Palm Beach County, FL - FDOT District 4 YEARS COMPLETED PROFESSIONAL SERVICES 2006-2008 CONSTRUCTION 2007-2009 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm This design-Build project with Hubbard Construction Company involved the construction of new 60 foot single span bridge over an existing drainage, S&M and MOT design and plans preparation. I performed structural design and coordination with FDOT and the contractor as during construction support services during entire construction. d. (1)TITLE AND LOCATION (City and State) MDX 836-11, Design-Build SR-836, I-395 and I-95 Southbound to SR 836 Westbound, YEARS COMPLETED PROFESSIONAL SERVICES 2018-Ongoing CONSTRUCTION Current (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Consists of 19 bridges, new and widening, that includes proposed Viaduct over 100 feet high above the Miami River and integration of SR -836 to existing Interchange I -95 and I 395. For this ongoing Project, Mr. Dagly is responsible for review of Design submittals, At 90 %, 100 % and Final for the MDX portion of SR -836. Mr .Dagly will also review post Design service including shop drawings, construction related field issue & RFI etc. e. (1) TITLE AND LOCATION (City and State)City of Miami Gardens: Design Build of Hard Rock Stadium Renovation Pedestrian Bridges and Ramp MSE walls YEARS COMPLETED PROFESSIONAL SERVICES 2018-2019 CONSTRUCTION 2019 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm As Design Team, Mr. Dagly Prepared lay out of Pedestrian Bridges and Ramps MSE wall over NW 199th Street as well as over Florida turnpike Access Road. These pedestrian bridges will eliminate traffic congestions and provide easy access to Hard Rock Stadium and will be ready before 2020 Super bowl which will be held in this stadium. 2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME:Dinesh Dagly, PE 13.ROLE IN THIS CONTRACT: Quality Control 14.YEARS EXPERIENCE a.TOTAL:50 b. WITH CURRENT FIRM: 5 15.FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Suite 410, Miami, FL 33126 16.EDUCATION (Degree and Specialization):1968 Master of Science Civil Engineering Wayne State University 1966 Bachelor of Science in Civil Engineering, Sardar Patel University, India 17.CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer: Florida – 29386 18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): 19.RELEVANT PROJECTS a. (1)TITLE AND LOCATION (City and State) Hard Rock Stadium Pedestrian Bridges, City of Miami Gardens YEARS COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION 2020 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm Structural Project Manager responsible for the design services of two pedestrian bridges substructures, and for the MSE wall control drawings for the ramps at both bridge approaches. The bridges will facilitate pedestrian access to and from the Hard Rock Stadium which can hold up to 60,000 spectators. The bridge over NW 199th Street is 151’-11” long, while the other bridge over the Turnpike Access Road is 206’-11” long. Both bridge superstructures are simple span, variable-depth walk-thru steel trusses that are 14’ wide. The substructures consist of pile bents with 24” prestressed concrete piles. The bridges approach ramps consist of concrete walkways supported by wrap-around MSE walls. Stairs at the ramp entrances were also provided to facilitate pedestrian access during sport events. Construction on this fast-track Design-Build project began in mid-January 2019 and is scheduled for completion by the end of September 2019 - just in time for the onset of the NFL regular season and five months before the stadium hosts Super Bowl LIV. Location: Miami-Dade County, FL. b. (1)TITLE AND LOCATION (City and State)I-75 / I-595 Interchange Bridges, Phase II – Broward County, FDOT District 4 YEARS COMPLETED PROFESSIONAL SERVICES 1985-1987 CONSTRUCTION 1988-1990 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm Design of nine concrete segmental bridges for a four-level fully directional interchange of I-75, I-595, and the Sawgrass Expressway. At 550 acres, this is the largest interchange in Florida. Bridges included both single and twin boxes. Bridges ranged from just under 400 feet to almost 4000 feet in length. Maximum span length exceeded 200 feet. The combined length of the bridges exceeded two miles and bridge deck area exceeded 600,000 square feet. Pier heights exceeded 60 feet. Project required a total of 1,366 full section 10-foot segments which were cast on-site and then erected in balanced cantilever fashion. Mr. Hadrous was responsible for the design of all the segments for both the single and twin box bridges including typical segments, CIP segments, and pier segments. Mr. Hadrous also designed the cantilever and suspended expansion joint segments, the expansion joint hinge details, and longitudinal closure pours for the twin boxes. Mr. Hadrous was also responsible for quality control reviews of the design and plans for the Piers for Bridge F2 (8 Spans, 1071 feet). c. (1)TITLE AND LOCATION (City and State)Evans Crary Sr. Bridge – Martin County, FDOT District 4 YEARS COMPLETED PROFESSIONAL SERVICES 1994-1996 CONSTRUCTION 1997-2001 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm The Evans Crary Sr. Bridge has an overall length of approximately 2,982 feet with seventeen continuous spans and a maximum span length of 180 feet. The twin, precast segmental structures are 49’-4¼” wide and are separated by a 1’–6” gap. Each is wide enough to carry two traffic lanes, two emergency lanes, a bicycle lane, and a pedestrian lane. Rising at a vertical grade of 5.2%, the bridge provides 65 feet vertical and ninety feet horizontal clearance over the St. Lucie River and Piers were designed for Ship Impact. Box girders are a constant 8 feet in depth and the bridges are continuous from end to end with no intermediate expansion joints. Mr. Hadrous was responsible for the original design and detailing of the post-tensioned concrete box girders including typical segments, modified segments and cast-in place segments. He was also responsible for the segment anchorage details, future post-tensioning details, bridge erection schedules, segment shear key details, and bridge jacking details. d. (1) TITLE AND LOCATION (City and State)Flagler Beach Bridge YEARS COMPLETED PROFESSIONAL SERVICES 1993 CONSTRUCTION 1995 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Bridge Design Engineer Bridge Design Engineer for this high-level post-tensioned 72” Florida Bulb T bridge with 528’ typical superstructure units with four continuous spans of 132’ each. The bridge included over 25,000 linear feet of girders, 505,000 pounds of post-tensioning and 245,000 square feet of bridge deck. Mr. Hadrous was responsible for analysis, design and plans production for the post-tensioned concrete girders including tendon geometry and anchorage details. Location: Flagler County, FL. e. (1) TITLE AND LOCATION (City and State)YEARS COMPLETED 2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME:Abdulkadir (Abid) Hadrous, P.E.13. ROLE IN THIS CONTRACT: Bridges/Structures 14.YEARS EXPERIENCE a.TOTAL:36 b. WITH CURRENT FIRM: 9 15.FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 16.EDUCATION (Degree and Specialization):1982 MSCE - Syracuse University 1981 BSCE - Syracuse University 17.CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer: Florida – 38648 18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): Port of Miami / Dodge Island Bridges – Miami-Dade County, FDOT District 6 PROFESSIONAL SERVICES 1987-1989 CONSTRUCTION 1990-1991 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm The Port of Miami Bridge over the Intracoastal Waterway is a high-level fixed structure providing vehicular access to and from the Port of Miami. It was the first double cell precast segmental box girder bridge in Florida. The width of each of the twin bridges is 53 feet and the depth of the box was 9’-3”. Overall bridge length was 2522 feet with sixteen spans ranging from 96 feet to 195 feet long. The structure consists of two continuous units. Unit 1 was a ten Span Continuous Unit 1674 feet in length. Unit 2 was six Span Continuous Unit 848 feet in length. The bridge provided a minimum vertical clearance of 65 feet over the Intracoastal Waterway, a horizontal clearance of 90 feet between fender systems, and piers were designed for ship impact. Mr. Hadrous was responsible for the design and detailing of all segmental units including standard segments, end segments, pier segments, and cast-in-place segments. Mr. Hadrous was also responsible for the bridge jacking details and utility attachment and access details (e.g. telephone duct bank, power duct bank). 19.RELEVANT PROJECTS a. (1)TITLE AND LOCATION (City and State)SR-5/US1 from South Street to Magnolia/Shangri-La Drive, Volusia County, FL YEARS COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION 2016 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firmQuality Reviewer for design of foundations and approach slabs of two pedestrian bridges, box culvert extension, and post-design services. One feature of the design is aluminum prefabricated truss bridges are recommend to FDOT for the two pedestrian bridges across the creek, and technical special provisions of aluminum prefabricated truss bridges were prepared, since these are the first aluminum pedestrian bridges used in FDOT projects. b. (1)TITLE AND LOCATION (City and State)Snake Creek Pedestrian Bridge – North Miami Beach, FL YEARS COMPLETED PROFESSIONAL SERVICES 2008 CONSTRUCTION 2009 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Mr. Li served as Structure Design Engineer and involved in the preliminary concept design and the final design of geometry, pile bent foundation. The new pedestrian bridge crossing the Snake Creek (C-9) Canal at Challenger Park in North Miami Beach replaced a timber structure that was decades old and in dire need of repair. So much so, that the timber structure was closed to traffic for a number of months before its demolition. EAC Consulting assessed the costs of repairing and continued maintenance versus replacing. The economics overwhelmingly proved that replacement would be in the City’s best interest. c. (1)TITLE AND LOCATION (City and State)Miscellaneous Maintenance Repairs of NW 116th Way Bridge Over C-6 Canal, Town of Medley, FL YEARS COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION 2011 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Structures Engineer for the project which consisted repair of cracks and spalls, retrofit of partial slab top reinforcement between the interior bents, application of FDOT specified epoxy as an overlay to the entire bridge deck, replacement of all expansion joints, replacement of damaged guardrails, repairs of the embankment at the abutments, and milling and resurfacing of the approach roadway to provide a smooth transition pavement to the bridge. EAC also prepared the MOT plans per the project requirements, and provided post-design services including shop-drawing review and construction assistance. d. (1) TITLE AND LOCATION (City and State)I Bridge Design and Plans Preparation for Linton Blvd over the E3 and E3 1/2 Canals YEARS COMPLETED PROFESSIONAL SERVICES 2001-2002 CONSTRUCTION N/A (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm The project includes Structural Design Engineering and plans preparation services for the replacement of Linton Blvd Bridges over the E4 and E3 1/2 Canals. Mr. Li served as Structure Design Engineer. The bridges are being replaced with transversely post-tensioned pre-stressed slabs unit bridges. One bridge is a three span concrete slab structure while the other is comprised of only one span. e. (1) TITLE AND LOCATION (City and State)SR-7/NW 5th Street Bridge Replacement over the Miami River YEARS COMPLETED PROFESSIONAL SERVICES 2005-2007 CONSTRUCTION N/A (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm The project includes one 150’ bascule bridge, one 34’ approach span at each end with CIP concrete slab, four MSE walls and one seawall around the bridge. Mr. Li served as the Project Engineer and was responsible for the overall design of the approach spans, the MSE walls and the seawall. He designed the MSE walls and the seawall and performed QC for the approach spans structure components. STANDARD FORM 330 (REV. 3/2013) PAGE 2 2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME:Chun Li, PE 13. ROLE IN THIS CONTRACT: Bridges/Structures 14.YEARS EXPERIENCE a.TOTAL:18 b. WITH CURRENT FIRM:18 15.FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 16.EDUCATION (Degree and Specialization):1999 MSCE in Structural and Foundation Civil Engineering -University of Central Florida 1995 MSCE - Geotechnical Engineering - Zhejiang University, P.R., China1992 BSCE - Zhejiang University, P.R., China 17.CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer: Florida – 63052 18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): 19.RELEVANT PROJECTS a. (1)TITLE AND LOCATION (City and State)Hard Rock Stadium Pedestrian Bridges, City of Miami Gardens YEARS COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION 2020 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm Structural Engineer Provided design services for the two pedestrian bridges substructures and for the MSE wall control drawings for the ramps at two pedestrian bridges to facilitate pedestrian access to and from the Hard Rock Stadium, which can hold up to 60,000 spectators. One of the proposed bridges, with a span length of 151’-11” and a width of 14’, is over NW 199th Street on the south side of the stadium. The other, with a span length of 206’-11”and a width of 14’, is over the Turnpike Access Road on the east side. b. (1)TITLE AND LOCATION (City and State)New Service Bridge, Palm Beach County, FL - South Florida Water Management YEARS COMPLETED PROFESSIONAL SERVICES Current CONSTRUCTION N/A (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm Bridge Design Engineer for the design of a service bridge approximately 200 feet length in upstream to carry light-duty vehicles and for the installation of a new trash removal system. The eight short span bridge is designed by utilizing precast slab with traffic barrier as superstructure and substructure consists of prestressed piles and end bent anchor walls. c. (1)TITLE AND LOCATION (City and State) I-95/Spanish River Interchange – FDOT District 4; Palm Beach County, FL YEARS COMPLETED PROFESSIONAL SERVICES 2014 CONSTRUCTION 2018 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm Main Structural Engineer/Reviewer representing FDOT for the development of RFP (Request for Proposal), staff hour preparation and negotiation, coordination with FDOT central office for design variations and exceptions, etc. for this three-level fully directional new interchange The whole project included two main I-95 bridge widenings, two high profile bridge replacement crossing MDX rail, 11 new bridges and other miscellaneous structures. Ms. Wang was responsible for reviewing all bridge construction plans, coordinated with design consultant and central office for the design and post design issues. d. (1)TITLE AND LOCATION (City and State)Bridge Replacement Kingfisher Waterway NE 23 Ave - Broward County, FL YEARS COMPLETED PROFESSIONAL SERVICES 2014 CONSTRUCTION 2015 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Bridge Design Engineer for the design of a cast in place continuous deck bridge. The overall length of bridge is 68', with a three-span 16" cast-in-place slab sitting on pile bents. Each intermediate bent consists of 6 piles. The lateral earth pressure combined with vertical loads was resisted by bent/wing wall attached to dead-man anchor wall. The challenge of this project was the post design issue. The construction experienced predrilled pile for unknown utilities, extraordinary hard soil layers and unpredicted settlement of adjacent structures, etc. e. (1) TITLE AND LOCATION (City and State)Bridge Widening I-75 NB at Griffin Road - Broward County, FL YEARS COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION N/A (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm Bridge Design Engineer for the design of existing bridge widening. The bridge consist of a width of 94’-8 ½”, and from left to right the typical section is made up of the following elements: a 1’-4 ½” existing traffic railing; a 10’-0” shoulder; four 12’-0” traffic lanes; two 12’-0” entrance ramp lanes; a 10’-0” shoulder; and a 1’-4” traffic railing. Bridge length and span arrangement remain unchanged. Currently, the 127’-6” long, 7” thick deck is supported by AASHTO Type II beams. The widened portion of the bridge has an 8” thick deck supported by a Florida-I 36 beams. 2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME:Ning Wang, PE 13.ROLE IN THIS CONTRACT:Bridges/Structures 14.YEARS EXPERIENCE a.TOTAL:16 b. WITH CURRENT FIRM: 3 15.FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 16.EDUCATION (Degree and Specialization):17.CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer: Florida – 66993 18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): 19.RELEVANT PROJECTS a. (1)TITLE AND LOCATION (City and State)Statewide Bridge Load Rating, Miami, FL YEARS COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION 2020 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X ] Check if project performed with current firm Hamid contributed to the load rating of several steel and concrete bridges. He performed the finite element modeling, analysis, and load rating of steel composite superstructures, prestressed steel cap-beams, and prestressed concrete beams and slabs. He also performed the fatigue assessment and retrofit design of cracked steel girders. Hamid also contributed to the QC of the load rating projects performed by others. b. (1)TITLE AND LOCATION (City and State)ATC-120 Project on Seismic Analysis, Design, and Installation of Nonstructural Components and Systems, San Francisco, CA YEARS COMPLETED PROFESSIONAL SERVICES 2016-2018 CONSTRUCTION Ongoing (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Hamid performed design and nonlinear analysis of several short- to mid-rise steel moment resisting frames and reinforced concrete shear walls, developed elastic/inelastic acceleration and displacement floor response spectra for the numerical building models and instrumented and shake-table tested buildings, contributed to developing improved provisions for the design of nonstructural components to be adopted into seismic design practice via ASCE/SEI 7 load standard. c. (1)TITLE AND LOCATION (City and State) Hamid-Abad Bridge, Shoosh, Iran YEARS COMPLETED PROFESSIONAL SERVICES 2012-2013 CONSTRUCTION 2012-2014 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm A tied arc steel bridge, steel composite superstructure, single span, 446-ft long, seismically isolated by lead rubber bearings. Hamid was a Senior Structural Engineer, modeled, analyzed, and designed the multi-girder composite deck. Hamid also provided the detailed drawings for the deck. d. (1)TITLE AND LOCATION (City and State)Karimkhan Bridge, Tehran, Iran YEARS COMPLETED PROFESSIONAL SERVICES 2011-2013 CONSTRUCTION 2011-2013 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm A steel flyover bridge, 1476-ft long, orthotropic steel deck, multi-column steel piers. Hamid was a Senior Structural Engineer, conducted seismic assessment using linear and nonlinear analyses based on FHWA and Caltrans provisions, designed strengthening of the bridge, and provided detailed drawings. The rehabilitation scheme included added reinforced concrete overlay and micro piles to improve the capacity of the existing foundations, extending the existing beam-column connection plates and renewing the existing bolts. e. (1)TITLE AND LOCATION (City and State)Danesh-Amuz Intersection, Karaj, Iran YEARS COMPLETED PROFESSIONAL SERVICES 2013-2014 CONSTRUCTION 2013-2015 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Three single-span concrete bridges with integral abutments and multicell concrete decks, and 115-ft max span. Hamid was a Senior Structural Engineer , modeled, analyzed and designed the multicell concrete deck, the integral abutments, foundation piles, retaining walls of the ramp and provided the detailed drawings, coordinated with the contractors in the field and led the inspection team. 2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME:Hamid Anajafi, EI, PhD 13.ROLE IN THIS CONTRACT: Bridges/Structures 14.YEARS EXPERIENCE a.TOTAL: 6 b. WITH CURRENT FIRM: 1 15.FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 16.EDUCATION (Degree and Specialization):Ph.D. in Civil Engineering, University of New Hampshire, Durham, NH (Sep 2014 M.Sc. in Structural Engineering, University of Tehran, Iran (Sep 2007 – Dec 2009B.Sc. in Civil Engineering, K.N.T. University of Technology, Tehran, Iran(Sep 2003 – Sep 2007) 17.CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Engineer in Training 18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): 19. RELEVANT PROJECTS a. (1)TITLE AND LOCATION (City and State)SR 826/Palmetto Express Lanes from North of Canal C-8 Bridge (NW162 St.) to East of NW 67th Avenue (FPID No. 435760-2-52-01) FDOT District 6, Miami, FL YEARS COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION 2023 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firmProject Engineer for the Temporary Traffic Control Plans for the reconstruction of this 1.5 mile segment of the Palmetto Expressway to widen for the implementation of Express Lanes. The existing six-lane divided limited access facility will be widened to accommodate two express lanes and provide auxiliary lanes between the interchanges. A tolling point will be provided within this section and a Single Point Urban Interchange (SPUI) will be provided at NW 67 Ave. The project requires extensive coordination with the adjacent projects, FTE, City of Miami Lakes and Miami-Dade County. The project is the second segment (Segment 2) of six segments that extends the Express Lanes from I-75 to the I- 95/Golden Glades Interchange. b. (1)TITLE AND LOCATION (City and State)Express Lanes - SR 826 from Flagler Street to NW 154 Street and I-75 from SR 826 to NW 170 Street, Miami, FL YEARS COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION 2019 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm Roadway Engineer for this project. The scope of the proposed improvements includes design and construction of 10 miles of Express Lanes along SR 826 and 3 miles along I-75. The project limits extend from West Flagler Street to NW 154th Street along SR 826, and from SR 826 to NW 170th Street along I-75. The project includes the widening of 9 bridges along SR 826 as well as the new 826/I-75 Express Lanes connector. c. (1)TITLE AND LOCATION (City and State)Boca Grande Causeway North Swing Bridge over Gulf ICWW, Placida, Florida, Project No. 2010-03, Gasparilla Island Bridge Authority, Gasparilla Island, FL YEARS COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION N/A (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm Roadway Engineer responsible for performing QA/QC of roadway and TTCP designs and plans for the Final Design for the replacement of a 220-foot swing-span bridge. Project consists of 678 feet of new bridge including a 250-foot deck girder swing span and approach spans utilizing Florida I-Beams. Embankments are supported by MSE walls and protected by new bulkheads and revetment. In addition to the bridge structures and new pile support tender house is part of the scope. Responsible for development of the preliminary roadway geometrics and proposed drainage design. d. (1) TITLE AND LOCATION (City and State)SR 968/SW 1st Street Bridge over Miami River, FM No. 424407-1-52-01, Miami, FL YEARS COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION 2022 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Lead roadway engineer responsible for TTCP and the geometrical realignment (both horizontal and vertical) of the approach roadway segments associated with the replacement of the nationally registered historic SW 1st St Bridge crossing the Miami River. Constructed in 1929, the existing 650.5-foot, 13-span bridge is the gateway crossing into downtown Miami. The new 507-foot bridge will include a 315-foot double-leaf bascule span over a widened 125-foot navigation channel. Two new approach spans will consist of prestressed concrete beams providing at least 16.5 feet of clearance over North and South River Drives. Bascule span roadway deck will be an exodermic concrete deck providing protection of the steel superstructure and a safer/quieter riding surface. The existing roadway at both ends of the bridge will be raised by several feet in order to accommodate the new bridge, requiring major reconstruction and a complex TTCP detour. e. (1) TITLE AND LOCATION (City and State)SR-90/US-41/Tamiami Trail Bridge project (FM No. 434922-1-52-01) FDOT District 6, Miami, FL YEARS COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION 2019 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm Roadway, TTCP, and S&PM EOR for this project in the eastern Everglades of Miami-Dade County which replaced approximately 2 miles of the existing at-grade roadway with 2 elevated bridges to restore the natural flow of water within the Everglades basin. This Design-Build project required extensive coordination with National Parks Service and the Florida Department of Environmental Protection as well as local businesses and residents. STANDARD FORM 330 (REV. 3/2013) PAGE 2 2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME:Satiar Shirazi, PE 13. ROLE IN THIS CONTRACT:Highway Design Roadway /MOT 14.YEARS EXPERIENCE a. TOTAL: 12 b. WITH CURRENT FIRM:≤ 1 15.FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 16.EDUCATION (Degree and Specialization):JD, Florida International University, 2019 BS Civil Engineering, University of South Alabama, 2007 17.CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Florida Professional Engineer – 75734 California – #78673 18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): 19.RELEVANT PROJECTS a. (1)TITLE AND LOCATION (City and State)PD&E Study for SR 9/I-95 from South of SR 870/Commercial Boulevard to North of Cypress Creek Road, Broward County, FL YEARS COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION ONGOING (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Engineer for this PD&E study consisting of improvements to the interchanges of I-95 and Commercial Boulevard and I-95 and Cypress Creek Road, which will reduce congestion, enhance safety, and achieve an acceptable level-of-service while minimizing potential impacts to the natural and human environments. Responsible for the alternative analysis and design, as well as the development of the Preliminary Engineering Report for this project. b. (1) TITLE AND LOCATION (City and State)Re-evaluation for Golden Glades Multimodal Transportation Facility (GGM Travel Center (GGTTC), Miami-Dade County, FL YEARS COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION ONGOING (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Engineer for the Re-evaluation of the GGMTF PD&E study completed in 2006, and conceptual alternatives evaluated for the GGMTF and GGTTC completed in 2014. Responsible for the evaluation of prior PD&E study concepts, updating the facility design based on current standards, and coordination with transit agencies to develop maintenance agreements c. (1) TITLE AND LOCATION (City and State)Bridge Reconstruction (Bridge #870660) for SR 968 / SW 1ST St. at Miami River from SW 6TH Ave. to SW 2ND Ave., Miami-Dade County, FL YEARS COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION ONGOING (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Engineer Intern for this bascule bridge replacement project consisting of roadway reconstruction, milling and resurfacing, ADA upgrades, signalization, lighting, and S&PM. Responsible for S&PM plans, pavement design package, design variation/exception packages, MOT plans, and quantities. d. (1) TITLE AND LOCATION (City and State)RRR for SR 969 / NW 72ND Avenue / Milam Dairy Rd. from North of NW 25TH St. to NW 74TH St. Connector, Miami-Dade County, FL YEARS COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION 2017 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Engineer Intern for this 2.7-mile urban RRR project consisting of milling and resurfacing, ADA upgrades, S&PM upgrades, drainage improvements, safety improvements. Responsible for S&PM plans, design variation/exception packages, quantities, and cost estimates. e. (1) TITLE AND LOCATION (City and State)Various Municipal Infrastructure Improvement Projects, Miami-Dade County, FL. YEARS COMPLETED PROFESSIONAL SERVICES 2013 CONSTRUCTION 2015 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Engineer Intern for various RRR projects within the City of Doral. Responsible for procurement of contract plans consisting of milling and resurfacing, S&PM plans, quantities, and cost estimates. 2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME:Shan Patel 13.ROLE IN THIS CONTRACT:Highway Design Roadway / Maintenance of Traffic 14.YEARS EXPERIENCE a.TOTAL: 7 b. WITH CURRENT FIRM: 1 15.FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 16.EDUCATION (Degree and Specialization):2012 BS Civil Engineering Florida State University 17.CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Registered Professional Engineer: Florida (No. 83723) 18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): 19.RELEVANT PROJECTS a. (1)TITLE AND LOCATION (City and State)Miramar Toll Plaza – Florida’s Turnpike Enterprise - Miramar, FL. YEARS COMPLETED PROFESSIONAL SERVICES 2006 CONSTRUCTION 2015 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE X [X] Check if project performed with current firm Roadway Design Engineer supporting the geometric redesign of the existing Miramar Toll Plaza in Broward County, Florida. Additional duties included assisting with the traffic control plan which for the 1.2-mile of Turnpike mainline widening, the reconstruction of the Turnpike westbound exit ramp to University Drive and roadway improvements to NW 215th Street (County Line Road). b. (1)TITLE AND LOCATION (City and State)Sand Lake (SR-482) Project – Florida Department of Transportation, District V YEARS COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION Ongoing (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Maintenance of Traffic Lead Engineer providing Value Engineering Services for this DB project delivering an innovative MOT solution that supported construction of new concrete pavement from Greenbriar Parkway to west of John Young Parkway including the Shingle Creek Bridge Replacement. c. (1)TITLE AND LOCATION (City and State)SR-836/NW-87th Avenue Project – Miami-Dade Expressway Authority - Miami, FL YEARS COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION Ongoing (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Senior Highway Engineer in charge of the coordination and development of temporary traffic control plans for the reconstruction of the SR-836/NW 87th Avenue (Galloway Road) Interchange in Miami-Dade County. This conventional design project also includes the construction of seven new bridges along with roadway improvements to NW 87th Avenue and NW 12th Street. d. (1) TITLE AND LOCATION (City and State)Design-Build Project for SR-9/I-95 Widening from North of SR-60 to Indian River/Brevard County Line – Florida Department of Transportation, District IV YEARS COMPLETED PROFESSIONAL SERVICES 2013 CONSTRUCTION 2017 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Senior Highway Engineer in charge of the development of the traffic control plan scheme for the 13-mile inside widening of I-95, the construction of 16 box/bridge culverts along the corridor and the reconstruction of the I-95/CR-512 (Fellsmere Road) Interchange in Indian River county. e. (1) TITLE AND LOCATION (City and State)Design-Build Project for Central Boulevard Widening, Realignment and Service Loop – Miami- Dade Expressway Authority - Miami, FL YEARS COMPLETED PROFESSIONAL SERVICES 2011 CONSTRUCTION 2015 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Senior Highway Engineer in charge of coordinating and developing maintenance of traffic plans. The project had the primary goal of separating commercial traffic from passengers with the introduction of service roads to accommodate the commercial traffic in and out of the Miami International Airport. The project also included widening, reconstruction and roadway improvements of Central Boulevard from MIA upper and lower terminals to LeJeune Road as well as the reconstruction of NW 20th Street to a 4-lane divided road. 2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME:Cesar Quiroz, PE 13.ROLE IN THIS CONTRACT:MOT Engineer 14.YEARS EXPERIENCE a.TOTAL: 23 b.WITH CURRENT FIRM: 1 15.FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Suite 410, Miami, FL 33126 16.EDUCATION (Degree and Specialization): 2009 Bachelor of Science in Civil Engineering Pontificia Universidad Católica del Perú 1996 Bachelor of Science in Civil Engineering Florida International University 17.CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer: Florida – 59472 18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): Advanced MOT Training 19.RELEVANT PROJECTS a. (1)TITLE AND LOCATION (City and State)FDOT D4: CR 714 Martin Hwy, FPID 436870-1: Roadway and Bridge Reconstruction and Widening, Martin County, FL YEARS COMPLETED PROFESSIONAL SERVICES 2019-2020 CONSTRUCTION TBD (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Mr. Shafiq was the lead drainage engineer, prepared construction plans, drainage reports, processed ERP permitting with SFWMD. Existing one-mile roadway segment was widened to 4-lane segment. He analyzed the required water quality and storage and prepared a pond siting and pond sizing reports. Client/Contact: FDOT District 4/ Maria Formosa, P.E., Phone: (954) 777-4677 b. (1)TITLE AND LOCATION (City and State)Palmetto Expressway/ SR 826 and I-75 Express Lane/ Managed Lane from NW 25th Street to Miami Gardens exit, Miami-Dade County, Florida. YEARS COMPLETED PROFESSIONAL SERVICES 2012-2013 CONSTRUCTION 2014-2015 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm He served as a drainage Engineer. His responsibilities included designing the drainage systems for 10 miles long corridor segment from NW 25th Street to Miami Gardens exit, analyzed the basin hydrology and hydraulics, prepared drainage maps, master drainage plans. He retrofitted many existing drainage structures, modifies existing systems to comply with the proposed design. c. (1)TITLE AND LOCATION (City and State)Master Surface Water Management Systems Design, Town of Bay Harbor Islands, FL. YEARS COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION TBD (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Mr. Shafiq was the PM and principal engineer for City wide stormwater master planning. He collected LiDAR data, created 3D DEM surface using Arc GIS 3D Analyst. He developed stage-storage for the sub-basins from DEM file using GIS 3D analyst feature, imported shape files with existing drainage features and networks into ICPR4, completed the network. He developed receiving body hydrographs for low tide and high tide conditions, analyzed the model, created CIP projects with recommendations of improvements, reviewed NPDES requirements, prepared grant application documents. Bay Harbor Islands uses one pump station and 12 control structures to outfall into Ocean which were considered in the model. The model was calibrated based on recent known storms and flooding. City Engineer-Douglas Armstrong, P.E., 305-866-6241 d. (1)TITLE AND LOCATION (City and State)Turnpike Widening from Sunrise Blvd to Atlantic Blvd, Broward County, FL. YEARS COMPLETED PROFESSIONAL SERVICES 2005-2006 CONSTRUCTION 2007-2008 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm As a project engineer, he was responsible for upgrading an existing two-way 6-lane roadway to a two-way 8-lane roadway with median barrier walls including ramps & bridges at interchange and cross roads. He was responsible for hydrology & hydraulics design that included surface water modeling, watershed modeling & detention pond design by ICPR, storm drainage design by ASAD, Trench drain design for approx. 12,000 feet flat grade pavement, prepared drainage maps, storm sewer plans & profiles, spread sheets, summary of drainage structures, and prepared permit reports & drainage reports. He went through the permitting process under SFWMD. Interchange drainage design: Performed complete drainage design for the interchange at Commercial Blvd including ramps, and toll plaza. e. (1)TITLE AND LOCATION (City and State)YEARS COMPLETED 2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME:Shahin Shafiq, PE, PTOE, PMP 13.ROLE IN THIS CONTRACT: Drainage Engineer 14.YEARS EXPERIENCE a.TOTAL: 18 b. WITH CURRENT FIRM: 1 15.FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 16.EDUCATION (Degree and Specialization):Master’s in Civil Engineering, Masters in Computer Science 17.CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer: Florida –65195; Texas – 96434 Professional Traffic Operations Engineer: 3238 18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): PMP - 1489731, IMSA Traffic Signal Field Technician Level-I FDOT D4: I-595 Improvements Proposal Efforts, Sawgrass to Hiatus Rd, Broward County, FL. PROFESSIONAL SERVICES 2009-2011 CONSTRUCTION 2010-2012 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm He served as a Project Engineer. His responsibilities included designing the drainage systems for 4 miles long corridor from Sawgrass Expressway and I-595 interchange to East of Nobhill Road, analyzed the basin hydrology and hydraulics using ASAD and ICPR, prepared drainage maps, master drainage plans, drainage structures, summary of drainage structures, computation book, performed hydraulics calculation using ASAD, Flood routing using ICPR. He used PercPack to simulate the ground water interaction and laid out drainage structures in plan and profile sheets, cut drainage structures using ASAD full version. 19.RELEVANT PROJECTS a. (1)TITLE AND LOCATION (City and State)SR 836 Design-Build from Red Road to NW 17th Ave. Miami-Dade County, FL YEARS COMPLETED PROFESSIONAL SERVICES 2013 CONSTRUCTION N/A (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Client: FDOT District 6. Role: Drainage Engineer. Responsible for the final drainage design for an FDOT Design-Build contract Odebrecht. Project was a widening of an existing highway with interchange improvements and major drainage remediation. The project was over 4 miles of analysis and guided the preliminary design effort to 50%. Responsible for the plans production, final Drainage Report, and permit coordination. b. (1) TITLE AND LOCATION (City and State)SR-5/US-1 from South Street to Magnolia/Shangri-La Drive Brevard County, FL YEARS COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION N/A (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Client: FDOT District 5. Role: Senior Drainage Engineer. Senior Drainage Engineer responsible for quality control associated with the design of new sidewalks, milling and resurfacing, and drainage impacts to roadside swales in this 8.1 miles RRR Project. The project was a four-lane rural section with proposed stormwater swales with some areas through a mostly urbanized area. c. (1)TITLE AND LOCATION (City and State)SR-566/Thonotosassa Rd. RRR Project from West Baker Street to Townsgate Court, Hillsborough County, FL YEARS COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION N/A (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Client: FDOT District 7. Role: Senior Drainage Engineer. Senior Drainage Engineer taking an active part in the quality control associated with the design of new sidewalks, milling and resurfacing, and drainage impacts to roadside swales. The project was a four-lane rural section with proposed stormwater swales with some areas through a mostly urbanized area. d. (1) TITLE AND LOCATION (City and State)Key Largo 1 Project Monroe County, FL YEARS COMPLETED PROFESSIONAL SERVICES 2015-2017 CONSTRUCTION N/A (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Client: Monroe County Public Works. Role: Senior Drainage Engineer. Senior Drainage Engineer taking an active part in the quality control associated with milling and resurfacing roadway improvements and drainage impacts to roadside swales in a local street RRR Project. The project was for 2-lane rural section residential street with proposed stormwater swales within local environmental areas adjoining the project area. e. (1) TITLE AND LOCATION (City and State)SR 821 (HEFT) Campbell Dr. Interchange Improvements Miami-Dade County YEARS COMPLETED PROFESSIONAL SERVICES 2016 2016 CONSTRUCTION N/A (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Client: Florida’s Turnpike Enterprise. Role: Senior Drainage Engineer. Senior Drainage Engineer responsible for technical assistance and quality reviews relating to the design of stormwater management facilities, open and closed conveyance systems, plans production, and preparation of the Drainage Design Documentation Report. This Design-Build project included the design, widening and reconstruction of the HEFT (SR 821) and Campbell Drive (SW 312th Street), in Miami-Dade County, to accommodate future needs for capacity, operational and safety improvements. The project contained a new westbound Campbell Drive to northbound HEFT interchange ramp, widening of the existing southbound HEFT off-ramp to two-lanes, widening of the HEFT to accommodate the ramp improvements, ITS, noise walls and drainage improvements. The project also had lighting, signal and turn lane improvements on Campbell Drive, upgrades to the bridge approaches guardrail, column strengthening at Campbell Drive overpass bridges, and replacement of the existing aluminum railing on all existing bridges. STANDARD FORM 330 (REV. 3/2013) PAGE 2 2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME:Herman D. Tirado, PE 13.ROLE IN THIS CONTRACT:Drainage Engineer 14.YEARS EXPERIENCE a.TOTAL: 42 b. WITH CURRENT FIRM:1 15.FIRM NAME AND LOCATION (City and State): -5959 Blue Lagoon Drive, Suite 410, Miami, FL 33126 16.EDUCATION (Degree and Specialization):1980 Bachelor of Science in Civil Engineering - University of Miami 17.CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer: Florida - 36910 18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): American Society of Civil Engineers (ASCE)/Environmental & Water Resources Institute (EWRI) (Associate Member, Past Luncheon Chair) 19. RELEVANT PROJECTS a. (1)TITLE AND LOCATION (City and State)SR A1A/Collins Avenue Improvements YEARS COMPLETED PROFESSIONAL SERVICES 2004 CONSTRUCTION NA (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Manager for design and plans preparation for the milling, resurfacing, restoration and rehabilitation of State Road A1A (Collins Avenue) between 5th and 15th Street in the City of Miami Beach. . b. (1)TITLE AND LOCATION (City and State)Tamiami Canal Historic Swing Bridge PD&E Study - FDOT D6 YEARS COMPLETED PROFESSIONAL SERVICES 2004 CONSTRUCTION NA (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firmProject Manager responsible for an Environmental Assessment (EA) PD&E study to consider the rehabilitation/replacement of a 1921 historic, two-lane, Bob-Tailed swing bridge over the Tamiami Canal and roadway reconstruction along the NW South River Drive/Delaware Parkway corridor. Project requirements include the collection of field traffic and travel data and the preparation of traffic, access management, engineering reports and environmental documents; a Section 4(f) document; and preliminary plans for this heavily urbanized arterial that services major business and residential communities. Improvements include a new higher, double-leaf Bascule Bridge; intersection reconstructions; and access management modifications. Extensive public involvement efforts are being done as part of this study. c. (1)TITLE AND LOCATION (City and State)Meridian Avenue over Collins Canal - FDOT D6 YEARS COMPLETED PROFESSIONAL SERVICES CONSTRUCTION 2014 - 2019 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Project Manager for the bridge replacement design services for the Meridian Avenue Bridge over Collins Canal. Improvements included: roadway, drainage, signalization, lighting and maintenance of traffic. Specifically, the project included the following: (1) Replacement of the bridge over Collins Canal; (2) Reconstruction of the south approach Meridian Avenue roadway. (3) Aesthetic/streetscape improvements which included: pigmented cement pavers for the roadbed and bridge, stone pavers for the sidewalk, stone veneer for the vertical surfaces of the bridge, and decorative lighting; (4) Drainage improvements which included the installation of a drainage well to dispose of the contaminated water prior to discharge into the Collins Canal and (5) Signalization and non-decorative roadway lighting. d. (1) TITLE AND LOCATION (City and State)PD&E Study for Venetian Causeway – FDOT District 6 YEARS COMPLETED PROFESSIONAL SERVICES 2012-Ongoing CONSTRUCTION N/A (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm The project requirements include the inspection of the bridges, engineering reports, environmental documents, a Section 4(f) document and preliminary plans. Project Manager and Structural Engineer responsible for conceptual Structural Analysis and design of the ten low level fixed span bridges, preparation of Preliminary Engineering Report study documents, public involvement workshops and activities, and coordination with sub-consultants and agencies. The Venetian Causeway bridges (ten low-level fixed spans and two movable bascules) from North Bayshore Drive in Miami to Purdy Avenue in Miami Beach were originally built in 1926 and have been designated as historic landmarks by the City of Miami and City of Miami Beach; they are also listed on the National Register of Historic Places (NRHP). Extensive public involvement efforts are being done as part of this study. The PD&E study will look at alternatives that satisfy the public; protect the environment; are sensitive to the historic designation; result in bridges that are safe, maintainable and serve the needs of the public. e. (1) TITLE AND LOCATION (City and State)MDX General Engineering Consultant, Miami-Dade County, FL. – Miami-Dade Expressway Authority (MDX) YEARS COMPLETED PROFESSIONAL SERVICES 2006 CONSTRUCTION N/A (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Program Director and Principal in Charge for MDX’s General Engineering Contract (GEC). MDX controls 31 miles of expressways and a $500+ million work program. Mr. Crooks’ primary responsibility included the management and oversight of the GEC. Since 2003, Mr. Crooks has been involved in all phases of the development of the RFPs and concept plans for these projects and had the added benefit of overseeing the construction and successful implementation of the projects in a timely and cost-effective manner. Some specific examples of the MDX projects where Mr. Crooks was involved are: 2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME:Enrique “Rick” Crooks, PE 13. ROLE IN THIS CONTRACT:Planning 14.YEARS EXPERIENCE a. TOTAL: 33 b.WITH CURRENT FIRM: 25 15.FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 16.EDUCATION (Degree and Specialization): 1991 - Master of Business Administration, Florida International University 1985 - Bachelor of Science in Civil Engineering, University of Florida 17.CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer: Florida – 42528 18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): •SR 836 from NW 57 Ave to NW 42 Ave widening for the addition of an auxiliary lane between interchanges. A concept report and RFP were developed for this $20 million design-build project. Provisions were included in the project to facilitate the future widening of this section. •SR 836 from NW 57 Ave to NW 17 Ave capacity and operational improvements. This $160 million design-build project includes the addition of one lane in each direction of SR 836, the incorporation of “Bus on Shoulders”, coordination with main line and ramp tolling points, the ability to implement managed lanes in the future, two Diverging Diamond Interchanges (DDIs), and the modification of two other interchanges. 19.RELEVANT PROJECTS a. (1)TITLE AND LOCATION (CITY AND STATE)South Florida Water Management District (SFWMD), Strategic Plan YEARS COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION N/A (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm Aligned planning, budgeting and evaluation activities with agency priorities and plans. Coordinated with the Governing Board, Executive Office and Program Managers to identify priorities, define performance measures, and determine agency actions for success. Managed the SFWMD Strategic Plan annually from initiation to Governing Board adoption, through implementation, performance measurement and reporting. Coordinated the budget development process to ensure consistency between the Strategic Plan, Annual Work Plan, and budget; implemented strategic initiatives, developed metrics, evaluated and interpreted results for feedback to agency leadership and interested and affected parties. Made numerous presentations to the SFWMD Governing Board, local government commissions, advisory groups, and the public on water management issues. b. (1) TITLE AND LOCATION (City and State)South Florida Water Management District (SFWMD), South Florida Report YEARS COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION N/A (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm Managed the annual development of Volume II of the South Florida Environmental Report – which replaced numerous individual fiscal, capital improvement, water resource, and land management reports. Also penned South Florida Environmental Report legislative bill in coordination with DEP and Florida’s other water management districts. Resulting legislation based on bill language now guides all water management districts c. (1) TITLE AND LOCATION (City and State)South Florida Water Management District (SFWMD), Water Supply Plans YEARS COMPLETED PROFESSIONAL SERVICES 2004 CONSTRUCTION N/A (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm Supervised the development and implementation of four regional water supply plans that cumulatively cover the SFWMD. These regional plans include analyses of shortfalls in water resources versus demand forecasts, as well as implementing projects to make the necessary water resources available. Plan development included water resource analysis through mathematical modeling; economic analyses, budgeting and project development; as well as coordination with local governments, utilities and urban, agricultural and environmental interest groups. Coordinated water supply plan implementation with the Comprehensive Everglades Restoration Plan (CERP). Prepared cost projections for projects within regional water supply plans. d. (1)TITLE AND LOCATION (City and State)South Florida Water Management District (SFWMD), Comprehensive Plan Review YEARS COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION N/A (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm Supervised the SFWMD Comprehensive Plan review process to meet SFWMD responsibilities within specified deadlines. Supervised the SFWMD review of Comprehensive Plans for municipalities within the SFWMD, including Evaluation Appraisal Reports (EARs). e. (1) TITLE AND LOCATION (City and State)South Florida Water Management District (SFWMD), Interagency Water Management Coordination Project YEARS COMPLETED PROFESSIONAL SERVICES 2011 CONSTRUCTION N/A (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm Chairman of the Memorandum of Understanding Committee for the South Florida, Southwest Florida and St. Johns River water management districts, which negotiated agreements between these neighboring water management districts regarding water resource investigations, planning, regulation and water shortage declarations. Represented the SFWMD in inter-water management district efforts to develop consistent approaches to analyze urban and agricultural water use – elected chairman of the committee by other water management district representatives. E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME:David Gilpin-Hudson, AICP 13.ROLE IN THIS CONTRACT:Planning 14.YEARS EXPERIENCE a.TOTAL: 28 b. WITH CURRENT FIRM: 1 15.FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 16.EDUCATION (DEGREE AND SPECIALIZATION):1986 Master of Science, Agricultural Engineering – University of Florida 1982 Bachelor of Science in Agricultural Economics-University of Florida 17.CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) 1997 American Institute of Certified Planners (AICP) 18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): American Planning Association E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME:Huntley Higgins, P.E., PMP 13. ROLE IN THIS CONTRACT: Civil Engineering Design 14. YEARS EXPERIENCE a.TOTAL:22 b.WITH CURRENT FIRM:12 15. FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 16. EDUCATION (Degree and Specialization): 2001 Master of Applied Science in Civil/Environ. Eng. -University of Toronto 1995 Bachelor of Science in Civil Engineering- University of the West Indies 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer: Florida 60726 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): Project Management Professional (PMP) American Water Works Association (AWWA) 19. RELEVANT PROJECTS a. (1)TITLE AND LOCATION (City and State)Biscayne Boulevard 12-inch Force Main Extension Improvements – City of North Miami, FL YEARS COMPLETED PROFESSIONAL SERVICES 2013 CONSTRUCTION 2015 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Manager and Senior Civil Engineer responsible for the design, permitting and construction administration of 5800 LF of 12-inch force main along Biscayne Boulevard, which is maintained by the Florida Department of Transportation (District VI), between NE 105th Street to NE 119th Street and then west to NE 16th Avenue. The project has an estimated construction cost of approximately $1.5 Million. The goal of the project is to provide the City with additional sewer conveyance capacity and meet regulatory operation criteria. b. (1)TITLE AND LOCATION (City and State)Washington Park Master Plan – City of North Miami Beach, North Miami Beach, FL YEARS COMPLETED PROFESSIONAL SERVICES 2012 CONSTRUCTION N/A (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firmProject Manager and Senior Civil Engineer responsible for developing a Master Plan for the redevelopment of a 2.1 acre park within the City of North Miami Beach. The design incorporated elements such as Crime Prevention Through Environmental Design (CPTED) concepts. The proposed park facilities include recreational fields for various sporting activities, outdoor pools, playgrounds, basketball courts and on-site parking facilities. A new state of the art recreational community center was proposed that houses a day care facility, ceramics studio, gymnasium, and other essential programs. In addition, several green initiatives were proposed to promote water and energy conservation practices. The construction cost for this project was estimated at $8,500,000. The goal of the project was to deter crime within the existing park facility by improving the access to quality and safe recreational facilities for residents. c. (1)TITLE AND LOCATION (City and State)NW 41St Street, from NW 79th Avenue to NW 87th Avenue – City of Doral; Doral, FL YEARS COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION TBD (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Drainage Engineer responsible for designing and permitting the roadway drainage design associated with NW 41st Street, between NW 79 Avenue to NW 87th Avenue. The scope of work included the widening of an existing two lane roadway (0.75 miles). Responsibilities included designing a fully on-site drainage system that consisted of drainage structures, storm sewers and french drains to dissipate the design storm. The project was designed to meet the requirements of Miami-Dade County Public Works Department (MDPWD), Miami-Dade County Department of Environmental Resources Management (DERM) and the South Florida Water Management District (SFWMD). d. (1)TITLE AND LOCATION (City and State)Palmer Park Site & Parking Lot Improvements, City of South Miami YEARS COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION 2019 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Project Manager and Engineer of Record for the design of Palmer Park’s improvements to its south & east parking lot. The project included the design of a site plan. drainage, paving and grading, striping and signage, etc. The drainage system included the design and use of filter socks, exfiltration trenches and a CDS hydrodynamic separator to alleviate flooding due to onsite and offsite flows. e. (1)TITLE AND LOCATION (City and State)Dixie Corridor Septic to Sewer Lift Stations – City of Hollywood, Hollywood, FL YEARS COMPLETED PROFESSIONAL SERVICES 2012 CONSTRUCTION 2015 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Manager and Senior Civil Engineer responsible for the design, permitting and construction administration services for four sewer lift stations in the City of Hollywood (W-08, W-09, W-10 and E-22). One of the lift stations was a complete replacement design for an existing station and the other two were new lift stations that are being added to their network. The project has an estimated construction cost of approximately $1.3 Million. The goal of the project was to allow residential and commercial properties to disconnect from their septic tanks and connect to sewer treatment systems thereby reducing environmental impacts. P-43 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME:Evelyn Rodriguez, P.E., ENV SP 13. ROLE IN THIS CONTRACT:Civil Engineering Design 14. YEARS EXPERIENCE a.TOTAL:9 b.WITH CURRENT FIRM:9 15. FIRM NAME AND LOCATION (City and State):EAC Consulting, Inc. – 5959 Blue Lagoon Suite 410, Miami Fl 33126 16. EDUCATION (Degree and Specialization): 2013 MS in Engineering Management – Florida International University 2010 BS in Civil Engineering – Florida International University 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Florida Professional Engineer – 78548 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.):Envision Sustainability Professional Member - American Society of Civil Engineers (ASCE) ASCE Miami Dade Branch Young Engineer of the Year 2017-2018 19. RELEVANT PROJECTS a. (1)TITLE AND LOCATION (City and State)Rehabilitation of Parking Lot No.7, 20 and 30, Coral Gables, FL YEARS COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION N/A (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Engineer of Record responsible for implementing improvements to the existing lots to alleviate concerns relating to deficient conditions including storm water ponding issues, ADA compliance, parking lot grading corrections, inadequate lighting levels, pavement irregularities, aesthetic landscaping upgrades and other visual defects. Furthermore, the City intends to enhance its parking lots by incorporating elements of sustainability and “green” environmentally friendly features that are consistent with the City’s initiatives. b. (1)TITLE AND LOCATION (City and State)Greynolds Park Rehabilitation and Improvements, Miami Gardens, Fl YEARS COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION 2019 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firmEngineer of Record for the site investigation, review of permitting agency requirements, schematic design and preliminary opinion of probable cost and construction documents, permitting and limited construction administration. This project included the preliminary evaluation and design of park the improvements such as parking lot renovations, access roadway re-alignment, existing culvert assessment and maintenance and new sidewalks. The project also included the regrading of the maintenance facility yard. c. (1)TITLE AND LOCATION (City and State)SW 64th Avenue (Twin Lakes Drive) Drainage Improvement, South Miami, FL YEARS COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION 2017 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firmEngineer of Record responsible for design of a new storm water collection and disposal system, including a newly design exfiltration trench drainage system to ameliorate the ponding being experienced by some of the residents along Twin Lake Drive. The project included 136 linear feet of French Drain with a safety of factor of 2, 6-proposed Type D3 inlets and 3 drainage manholes. The regrading of the swales within the drainage basin was paramount in making the proposed drainage system work efficiently. d. (1)TITLE AND LOCATION (City and State)NW 96th Street Roadway and Drainage Improvements, Town of Medley, FL YEARS COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION N/A (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ X] Check if project performed with current firm Engineer of Record for providing professional engineering design services for the preparation of construction documents for drainage improvements along NW 96th Street from SW River Drive to NW 87th Avenue. The scope of work included design of drainage system to collect and discharge into the C6 Canal, design, redefining cross slopes to facilitate drainage, design of complete streets concept (to improve pedestrian and bicycle traffic), pavement markings, permitting and opinion of cost. e. (1)TITLE AND LOCATION (City and State)I-75 Alligator Alley Environmental Education Project- Broward County, FL YEARS COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION TBD (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Engineer of Record for providing professional engineering design services for the improvement of the existing I-75/Alligator Alley rest area by constructing educational amenities which will require significant site work to reconfigure existing parking lots, access roads, drainage structures, utilities, lighting and sidewalks. Proposed educational amenities will include observation tower, board walks, walkways, constructed wetlands exhibits, asphalt trails, pavilions, hardscape (i.e. benches, trash receptacles, drinking fountains) and landscape. P-42 19.RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State)I-75 Alligator Alley Environmental Education Project – FDOT District 4,Broward County, FL YEARS COMPLETED PROFESSIONAL SERVICES On-going CONSTRUCTION N/A (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Designer for providing professional engineering design services for the improvement of the existing I-75/Alligator Alley rest area by constructing educational amenities within the existing site. Construction of educational amenities will require significant site work to reconfigure existing parking lots, access roads, drainage structures, utilities, lighting and sidewalks. Proposed educational amenities may include observation tower, board walks, walkways, constructed wetlands exhibits, asphalt trails, pavilions, hardscape (i.e. benches, trash receptacles, drinking fountains) and landscape. A decorative Alligator statue will be constructed within Environmental Educational Center limits. b. (1)TITLE AND LOCATION (City and State)Rehabilitation of Parking Lot No.7, 20 and 30 (including Galiano Park)– City of Coral Gables, Miami, FL YEARS COMPLETED PROFESSIONAL SERVICES On-going CONSTRUCTION N/A (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Designer for providing professional engineering design services for the rehabilitation of three parking lots in the City of Coral Gables. The City had informed EAC of its intent to implement improvements to the existing lots to alleviate concerns relating to deficient conditions including storm water ponding issues, ADA compliance, parking lot grading corrections, inadequate lighting levels, pavement irregularities, aesthetic landscaping upgrades and other visual defects. Furthermore, the City intended to enhance its parking lots by incorporating elements of sustainability and “green” environmentally friendly features that are consistent with the City’s initiatives. c. (1) TITLE AND LOCATION (City and State)Rehabilitation of City North Miami Wastewater Pump Stations (PS-24, PS-12 and PS-10) – City of North Miami, FL YEARS COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION 2019 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firmDesigner responsible for the construction oversight of three pump stations owned by the City have been identified with insufficient capacity per the City’s hydraulic analyses as part of the City’s Sanitary Sewer Master Plan. The pump stations will require upgrades to allow for the stations to satisfy the minimum working conditions and comply with jurisdictional and regulatory standards for operations. These pumps are:1) PS 24- Hospital Station located at NE 16th Avenue and NE 125 St 2) PS 10- Sans Souci 1 located on Canal Drive between NE 117 Rd and NE 118th Rd 3) PS 12- Sans Souci 3 located on 2100 Sans Souci Blvd. At the intersection of NE 122nd road and Canal Drive, there is ponding issues. EAC is to regrade the intersection and address the drainage issues with a drainage inlet that connects to the existing drainage system. d. (1)TITLE AND LOCATION (City and State)NW 96th Street Redesign– Town of Medley, Medley, FL YEARS COMPLETED PROFESSIONAL SERVICES On-going CONSTRUCTION N/A (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Provided professional engineering design services for the preparation of construction documents for drainage improvements along NW 96th Street from SW River Drive to NW 87th Avenue. The scope of work included design of drainage system to collect and discharge into the C6 Canal, design, redefining cross slopes to facilitate drainage, design of complete streets concept (to improve pedestrian and bicycle traffic), pavement markings, permitting and opinion of cost. e. (1) TITLE AND LOCATION (City and State)Gallery at Smathers Plaza – Related Urban Group; Miami, FL. YEARS COMPLETED PROFESSIONAL SERVICES On-going CONSTRUCTION N/A (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Designer for providing professional engineering design services for the preparation of construction documents for Gallery at Smathers Plaza development. The project is an 8-story residential complex/building comprised of 126 units located along SW 29th Court and SW 9th Street in Miami-Dade County, Fl. The project is part of a 5.7 Acres property where Smathers Phase I has interior renovations being done and Smathers Phase 2 was recently constructed in 2016. Project scope includes utility relocation, grading and drainage, site geometry and cross sections. The project also includes new parking areas, potable water main extension, and water service line. STANDARD FORM 330 (REV. 3/2013) PAGE 2 2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME:Miguel Lockward, PE, ENV SP 13.ROLE IN THIS CONTRACT:Civil Engineering Design 14.YEARS EXPERIENCE a.TOTAL: 5 b. WITH CURRENT FIRM:1 FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 15.EDUCATION (Degree and Specialization):2014 Bachelor of Science in Civil Engineering, Instituto Tecnologico de Santo Domingo (INTEC) 16.CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer, State of Florida No. 88552 17.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.):American Society of Civil Engineers E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME:Michael Adeife, P.E., ENV SP 13. ROLE IN THIS CONTRACT:Civil Engineering Design 14.YEARS EXPERIENCE a.TOTAL:27 b.WITH CURRENT FIRM:24 15. FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 16. EDUCATION (Degree and Specialization):MS in Civil Engineering, Florida International University BS in Civil Engineering, University of Lagos, Nigeria 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline):Florida Professional Engineer No. 56094 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.):Member of American Public Works Association (South Florida Chapter), American Society of Civil Engineers. Envision Certified Sustainability Professional (ENV SP) 19. RELEVANT PROJECTS a. (1)TITLE AND LOCATION (City and State)NW South River Dr. Streetscape Improvements – Town of Medley, FL YEARS COMPLETED PROFESSIONAL SERVICES 2013 CONSTRUCTION 2015 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firmEAC was tasked with the design for roadway, drainage and streetscape improvements along the NW S. River Drive corridor, from just southeast of NW 72nd Avenue to NW 74th Street within the Town of Medley, FL. This portion of NW S. River Drive is historically narrow, making it difficult for two-way vehicular traffic and all but impossible for pedestrian traffic. The Town awarded EAC with designing a new typical roadway section that incorporated a 6' wide concrete sidewalk, wider than standard width vehicular travel lanes, landscape improvement and hardscape enhancement through the main corridor and intersecting streets. This project achieved a safer travel corridor for vehicles, pedestrian access from Medley’s Riverside East Community Neighborhood, dedicated and shared use bicycle lanes along the corridor, overall beautification and a vibrant neighborhood. Role: Principal in Charge b. (1)TITLE AND LOCATION (City and State)Dixie Corridor Septic to Sewer Lift Stations – City of Hollywood, Hollywood, FL YEARS COMPLETED PROFESSIONAL SERVICES 2012 CONSTRUCTION 2016 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm As part of the City of Hollywood’s program to convert it’s residents from septic tanks to the City’s sewer system, EAC Consulting designed, permitted and provided construction administration services for four (4) lift stations along the Dixie Highway Corridor. One of the lift stations involved a complete rehabilitation of an existing station, while three others are new lift stations as part of converting commercial and residential areas within the Dixie Highway corridor from septic tanks to a centralized sewer system. Role: Project Manager c. (1)TITLE AND LOCATION (City and State)NW 41st Street, from NW 79th Avenue to NW 87th Avenue – City of Doral, FL YEARS COMPLETED PROFESSIONAL SERVICES 2011 CONSTRUCTION 2011 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Design Principal responsible for designing and permitting the roadway drainage design associated with NW 41st St, between NW 79th Ave to NW 87th Ave. The scope of work included the widening of an existing two-lane roadway (0.75 miles). Responsibilities included designing a fully on-site drainage system that consisted of drainage structures, storm sewers and French drains to dissipate the design storm. The project was designed to meet the requirements of MDC Public Works Dept. (MDPWD), MDC Dept of Environmental Resources Management (DERM) and the South Florida Water Management District (SFWMD). d. (1)TITLE AND LOCATION (City and State)NW 96th Street Drainage Improvements, Town of Medley, FL YEARS COMPLETED PROFESSIONAL SERVICES 04/2013 CONSTRUCTION 11/2013 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firmDesign Principal for this project, which consisted of drainage improvements along NW 96th St. from NW 87th Ave. to NW South River Drive. The existing road is located in the Town of Medley and it is approximately 2.33 acres based on Right of Way (R/W) delineation. The purpose of this project was to provide an adequately sized drainage system to comply with regulatory criteria, re-grading the existing swale areas and to provide roadway pavement cross-slope corrections through milling and asphalt resurfacing. These improvements will ultimately facilitate attenuation of excessive stages from routine storm events as well as increase the pavement structural capacity in addition to improving the drivability of the road. e. (1)TITLE AND LOCATION (City and State)Stormwater Improvement Implementation Plan - Village of Key Biscayne, FL YEARS COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION N/A (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project manager responsible to assist the Village of Key Biscayne in fulfilling goals for the six high priority area projects established in its Stormwater Improvement Implementation Plan in order to maximize fiscal efficacy and ensure compliance with the latest local, state, and federal regulations. The scope included implementing permanent and temporary erosion control systems, evaluation and analysis of existing drainage infrastructure, evaluation and design of backflow prevention devices, evaluation and design of gravity drainage wells, evaluation and design of possible pump station(s), evaluation and design of pressurized drainage wells, hydrologic and hydraulic evaluation of basins, sub-basins, and potential sub-basins, stormwater preliminary and final design, technical reports, plans preparation, bid document development, regulatory permitting, post design services, CA services and evaluation of high tide and its effect on the proposed drainage improvements. P- 40 19.RELEVANT PROJECTS a. (1)TITLE AND LOCATION (City and State)SR 968/SW 1 Street Bridge Maintenance of Traffic (MOT) Real Time Monitoring Pilot Project, FDOT District 6 YEARS COMPLETED PROFESSIONAL SERVICES 2014 CONSTRUCTION N/A (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Project Manager responsible for developing a turnkey solution for this arterial traffic management concept. This project’s intent was to minimize delays and support additional traffic during the MOT phase along the detour route using TSM&O strategies such as real-time traffic monitoring using temporary closed-circuit television (CCTV) cameras; daily travel time data collection and analysis using temporary Wi-Fi devices; and temporary signal timing modifications at impacted signals along the detour route. Project also included coordination with Project CEI relating to MOT improvements and coordination with Miami-Dade County Traffic Signal staff for signal timing changes. b. (1)TITLE AND LOCATION (City and State)SR 826 Palmetto Expressway Segment 2 Project, FDOT District 6 YEARS COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION N/A (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Senior ITS Engineer responsible for QA/QC of the ITS and Tolling Plans for this 1.5 mile segment Express Lanes corridor. Major ITS Project components include DMS, CCTV Cameras, MVDS, Ramp Signals, fiber optic cable and power distribution system. c. (1)TITLE AND LOCATION (City and State)SR 924/NW 119 Street ASCT Pilot Project, FDOT District 6 YEARS COMPLETED PROFESSIONAL SERVICES 2015-2017 CONSTRUCTION N/A (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Project Manager responsible for overseeing the development of the Pilot Project procurement documents and lead owner’s representative for the deployment of an adaptive signal control system along NW 119 Street from eastern terminus of SR 924 Gratigny Parkway (west of NW 32 Avenue) to NW 5 Avenue (east of I-95) and along SR 9/NW 27 Avenue from NW 110 Street to NW 119 Street. This 3 mile and 15 signalized intersection corridor included next generation traffic signal controller’s upgrade, new video detection system, new fiber optic cable based communications system, among others. The project procurement documents included development of PSEMP, ConOps, Request for Proposal, Signalization concept plans, cost estimates, schedules and coordination activities. d. (1)TITLE AND LOCATION (City and State)SR 90/SW 8 Street Adaptive Signal Control Technology (ASCT) Pilot Project, FDOT District 6 YEARS COMPLETED PROFESSIONAL SERVICES 2015-2017 CONSTRUCTION 2017 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Project Manager responsible for developing the project procurement documents and lead owner’s representative for the deployment of an adaptive signal control system along SW 8 Street from SW 67 Avenue to SW 142 Avenue. The project procurement documents included development of a Project Systems Engineering Management Plan (PSEMP), Concept of Operations (ConOps), O&M Plan, Request for Proposal (RFP) and Minimum Technical Requirements. In addition, Girish supported in the development of the Project’s Evaluation Plan, Community Awareness Plans, Deployment Plans, and a Technical Plan for this Pilot Project. He also supported the Department in planning the performance metric dashboards for the Pilot Project. e. (1) TITLE AND LOCATION (City and State)TSM&O Program GEC Consultant, FDOT District 6 YEARS COMPLETED PROFESSIONAL SERVICES 2012-2017 CONSTRUCTION N/A (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Senior Project Engineer involved in the development of numerous District 6 TSM&O Program initiatives such as the TSM&O Strategic Plan, TSM&O presentations and outreach material, District’s Core group meetings, Pilot Projects, etc. Multiple continuing initiatives included development of Monroe County Traffic Signal System ConOps and Implementation Plan, TSM&O Action Plan, Miami-Dade County Traffic Signal Maintenance Compensation Agreement (TSMCA) oversight support, Okeechobee Projects TSM&O deployments review oversight, etc. 2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME:Girish Thallapragada, PE 13.ROLE IN THIS CONTRACT:Lighting 14.YEARS EXPERIENCE a.TOTAL: 18 b.WITH CURRENT FIRM: 2 15.FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 16.EDUCATION (Degree and Specialization): 2001 MS in Civil Engineering, Certified ITS Graduate Virginia Polytechnic Institute and State University 2000 BS in Civil Engineering Andhra University 17.CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer: Florida – 73642; Texas - 101296 18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): 19.RELEVANT PROJECTS a. (1)TITLE AND LOCATION (City and State)North Cruise Boulevard Lighting Design, Miami, Miami-Dade County, FL Port of Miami YEARS COMPLETED PROFESSIONAL SERVICES N/A CONSTRUCTION (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm Electrical designer for 0.7 miles of roadway and overpass bridge. Includes upgrading existing light poles with new Light Emitting Diode (LED), upgrading new load center main and branch circuit breakers, circuit wire sizing and new underground conduits b. (1)TITLE AND LOCATION (City and State)City of Doral NW 41 Street Lighting Project YEARS COMPLETED PROFESSIONAL SERVICES N/A CONSTRUCTION (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm Electrical designer for 0.8 miles of roadway lighting on NW 41 Street between NW 79 Avenue and NW 87 Avenue. Includes upgrading existing light poles with new Light Emitting Diode (LED). c. (1)TITLE AND LOCATION (City and State)Traffic Management Center (TMC) Support Engineer, Miami-Dade County, FL-FDOT District 6 YEARS COMPLETED PROFESSIONAL SERVICES N/A CONSTRUCTION (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm Provided assessment and electrical design services to modify the Traffic Management Center (TMC) with added electrical infrastructure to support the 2nd floor Florida Highway Patrol (FHP) TMC operations. This included load monitoring and data analysis of existing power distribution equipment within the TMC network room to determine if the additional FHP loads could be added to the existing Power Distribution Equipment (PDU). Review of the existing branch circuits within d. (1) TITLE AND LOCATION (City and State)Statewide Telecommunications Integration - (ITS) Wide Area Network (WAN) Deployment | Miami-Dade County, FL, - FDOT District 4 & 6 YEARS COMPLETED PROFESSIONAL SERVICES N/A CONSTRUCTION (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm Under PB Farradyne and Telvent, provided electrical designs to integrate FDOT’s Intelligent Transportation System (ITS) Wide Area Network (WAN) which provides connectivity throughout the state by utilizing the statewide microwave system to connect the Regional Transportation Management Centers (RTMC) across the state. This project added network equipment into existing racks at District 4 and 6 to connect to existing RTMCs in Districts 2 and 5. This work included assessing existing loads and branch circuits available at the District 4 and 6 Traffic Management Center (TMC) and added the necessary electric branch circuits and breakers at panel boards within these TMC to accommodate the network equipment. Project also included modifications of FDOT sites between Miami-Dade and Orange County, along the Florida Turnpike to add necessary network equipment to facilitate connectivity to District 5, as well as FDOT sites to connect to District 2. e. (1) TITLE AND LOCATION (City and State)Dodge Island North Cruise Boulevard Roadway Lighting Design | Miami-Dade County, FL YEARS COMPLETED PROFESSIONAL SERVICES N/A CONSTRUCTION (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [] Check if project performed with current firm ITS Engineer Under PB Farradyne provided electrical power distribution design for two miles of roadway lighting at the Port of Miami Dodge Island, along North Cruise Boulevard previously called Eastern Port Boulevard, and provided utility power coordination with Florida Power & Light Company. STANDARD FORM 330 (REV. 3/2013) PAGE 2 2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME:Richard Lopez 13.ROLE IN THIS CONTRACT:Lighting 14.YEARS EXPERIENCE a.TOTAL:37 b. WITH CURRENT FIRM: 3 15.FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 16.EDUCATION (Degree and Specialization):1981 - Bachelor of Science in Electrical Engineering - University of Miami 17.CURRENT PROFESSIONAL REGISTRATION (State and Discipline) N/A 18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): Association of Energy Engineers-Member, Electrical Power Research Institute-Member, Institute of Electrical and Electronics Engineers-Member, National Fire Protection Association-Member, Quality Magazine Advisory Board-Member, South Florida Association of Engineers-Member. Certified Energy Manager. 19.RELEVANT PROJECTS a. (1)TITLE AND LOCATION (City and State) NW South River Drive Improvements- Town of Medley, Florida YEARS COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION 2017 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Engineer of Record responsible for the design of lighting improvements on NW South River Drive in the Town of Medley. Our involvement included the photometric and voltage drop analyses as well as the evaluation of LED lighting and coordination of load centers with the utility power company. b. (1)TITLE AND LOCATION (City and State)Miami Dade Expressway Authority Systemwide Lighting Improvement Contract – Miami, Florida YEARS COMPLETED PROFESSIONAL SERVICES 2007 CONSTRUCTION 2007 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Manager for systemwide roadway improvements project. Included the replacement of aging secondary load centers, safety improvements, installation of break-away pole bases and other system components to comply with current safety standards. c. (1)TITLE AND LOCATION (City and State)Widen NW 41St. Street from NW 79th to 87th Ave. – City of Doral, Florida YEARS COMPLETED PROFESSIONAL SERVICES 2011 CONSTRUCTION 2012 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm The project consisted of widen NW 14th Street from a two-lane roadway to a two-lane roadway with a shared turning lane. The project consisted of converting a roadway with a rural section to an urban section. Complete onsite drainage was required to meet the requirements of the Miami-Dade County, Department of Environmental Resources Management (DERM). Mr. Borges was responsible for reviewing voltage drop and photometric analyses, plans and QC the lighting plans. d. (1) TITLE AND LOCATION (City and State)SW 66th Street Roadway Improvements – City of South Miami, Florida YEARS COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION 2010 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Engineer of Record responsible for the design of lighting improvements. Our involvement included the photometric and voltage drop analyses for the installation of aesthetic lighting on SW 66th St. e. (1) TITLE AND LOCATION (City and State)SR-823 from Okeechobee Rd. to W. 18th Street – City of Hialeah, Florida YEARS COMPLETED PROFESSIONAL SERVICES 2011 CONSTRUCTION 2011 (3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Engineer of Record responsible for the roadway lighting improvements on SR 823. The project extended from Okeechobee Rd. to W 18th Street in the City of Hialeah. f. (1) TITLE AND LOCATION (City and State) Miami Dade Expressway Authority Roadway Improvements on SR 836 by NW 57th Ave. – Miami, Florida YEARS COMPLETED PROFESSIONAL SERVICES 2009 CONSTRUCTION 2009 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firmReviewed roadway lighting design as representative for MDX for compliance with contract documents, review of shop drawings and submittals. 2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME:Ramon Borges, PE 13. ROLE IN THIS CONTRACT:Lighting 14.YEARS EXPERIENCE a.TOTAL: 27 b. WITH CURRENT FIRM: 10 15.FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 16.EDUCATION (Degree and Specialization):BS – Electrical Engineering, University of Oriente, Cuba (1992) 17.CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer: Florida – 61622 18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): IMSA Fiber Optics for ITS Level I 19.RELEVANT PROJECTS a. (1)TITLE AND LOCATION (City and State)16-Inch Force Main and Lift Station Improvements- Miami-Dade School Board,Miami, FL YEARS COMPLETED PROFESSIONAL SERVICES 2007 CONSTRUCTION TBD (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firmProject Manager Responsible for the installation of a 16-inch force main and lift station for Miami-Dade School Board Bus Maintenance Facility at NW 137th Ave and NW 6th Street. b. (1)TITLE AND LOCATION (City and State)72nd Ave. For SR 826/Sr836 Interchange Improvements (Water and Wastewater) - Miami-Dade Expressway Authority, Miami, FL YEARS COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION TBD (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Sr. Project Manager who oversaw the relocation of a 16-inch water main and a 48-inch force main. c. (1)TITLE AND LOCATION (City and State)72-Inch Force Main Relocation - Miami-Dade Expressway Authority, Miami, FL YEARS COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION TBD (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Liason Project Manager for JPA 72-inch Force Main relocation for MDX/FDOT at NW 72nd Avenue and NW 8th Street. d. (1) TITLE AND LOCATION (City and State)Section 5 Interchange 48- Inch Force Main Improvement - Miami-Dade Expressway Authority, Miami, FL YEARS COMPLETED PROFESSIONAL SERVICES 2014 CONSTRUCTION TBD (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Construction Project Manager as part of its general Engineering Consultant contract with Miami Dade Expressway Authority, was charged with the programming and management of the design services for the relocation of a 48-inch PCCP Forcemain and installation of a 36-inch force main as part SR 826/SR 836 interchange improvements. The project includes two canal crossings under proposed culverts; furnishing and installing steel casings, resilient wedge gate valves, plug valves; furnishing and installing approximately 3000 LF of 48-inch ductile iron and PCCP pipe and fittings, valves and fittings of various sizes for water main, sanitary sewer and sewage force main; making connection to existing mains with tapping sleeves and valves or solid sleeves; air release and flushing valve outlet assemblies; furnishing and installing castings. The project also includes making connections to existing mains at low flow periods within the time determined by the MD WASD; dewatering existing mains; cleaning, testing and disinfecting the mains; temporary and permanent repairs; curb and gutter restoration; sidewalk restoration; furnishing additional suitable backfill materials; and all other appurtenant and miscellaneous items and work for a complete and fully functional installation. e. (1) TITLE AND LOCATION (City and State)72-Inch Force Main Improvements - Miami-Dade Expressway Authority, Miami,FL YEARS COMPLETED PROFESSIONAL SERVICES 1986 CONSTRUCTION 1988 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firmLiason Project Manager responsible for the installation of a 72-inch force main for MDWASD from 127th Avenue to 137th Avenue. STANDARD FORM 330 (REV. 3/2013) PAGE 2 2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME:Sergio Besu, C.G.C. 13.ROLE IN THIS CONTRACT:CEI/Construction Administration/Construction Management Services 14.YEARS EXPERIENCE a.TOTAL: 33 b.WITH CURRENT FIRM: 11 15.FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Suite 410, Miami, FL 33126 16.EDUCATION (Degree and Specialization):1977 – United States Navy C.E.C Office School – Port Hueneme, CA Public Works Management, Contract Administration 1976 – B.S. Civil Engineering – University of Detroit, Michigan 17.CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Florida – Certified General Contractor - No. 049682 18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): 19.RELEVANT PROJECTS a. (1)TITLE AND LOCATION (City and State)Biscayne Point Neighborhood Infrastructure Improvement. - City of Miami Beach, FL YEARS COMPLETED PROFESSIONAL SERVICES 2006 CONSTRUCTION 2013 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Administrator for this project that encompasses targeted potable water distribution and roadway/streetscape improvements. The project requires the design of approximately 19,000 LF of pressurized DIP water mains from 8-inch to 16-inch and service connections to homes of more than 500 residents in Miami Beach. The project involved the restoration and enhancement of streetscapes and infrastructure, consistent with existing available master plans, qualified decisions of applicable City dept., and community preferences. It also included portable water infrastructure, stormwater and restoration and enhancement of the neighborhood’s hardscape, streetscape, irrigation, and lighting. b. (1)TITLE AND LOCATION (City and State)Pine Island Road from Oakland Park Boulevard to Commercial Boulevard – Sunrise, FL YEARS COMPLETED PROFESSIONAL SERVICES 2008 CONSTRUCTION 2010 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Administrator responsible for responding to RFI’s, change orders, pay requests and plan interpretation for this project involving the reconstruction and widening of the existing 4-lane facility, to a 6-lane divided facility including bike lanes, sidewalk, 30-inch ductile iron (DIP) water main, drainage system, street lighting, signalization, landscaping, irrigation system, signing and pavement markings. c. (1)TITLE AND LOCATION (City and State)NW 21st Avenue from NW 19th Street to Oakland Park Boulevard – Fort Lauderdale, FL YEARS COMPLETED PROFESSIONAL SERVICES 2009 CONSTRUCTION 2011 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Senior Roadway Inspector / Project Administrator responsible for responding to RFI’s, Change Orders, Pay Requests plan interpretation, field inspections for this project involving the reconstruction of the existing 3-lane facility, including bike lanes, sidewalk, 8-inch ductile iron (DIP) water main, 6-inch force main, drainage system including jacked 72” RCP under the CSX R/R, asphalt paving, street lighting, upgrading the signalization system, landscaping, irrigation system, signing and pavement markings. d. (1) TITLE AND LOCATION (City and State)Sunrise Boulevard from Hiatus Road to Pine Island Road - Plantation, FL YEARS COMPLETED PROFESSIONAL SERVICES 2007 CONSTRUCTION 2009 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Project Administrator responsible for responding to RFI’s and plan interpretation. Widening and overbuild of an existing 4-lane divided facility to a 6-lane divided facility, including sidewalk, subsoil excavation, drainage, signalization, street lighting, landscaping, irrigation and signing & pavement markings. e. (1)TITLE AND LOCATION (City and State)145th Avenue / Pembroke Road – Miramar, FL YEARS COMPLETED PROFESSIONAL SERVICES 2003 CONSTRUCTION 2005 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Administrator responsible for approving pay requests and shop drawings Mr. Labelle responds to RFIs and change orders, plan interpretation and correspondence, and also oversee removal of unsuitable material. STANDARD FORM 330 (REV. 3/2013) PAGE 2 2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME:Jeffery LaBelle 13.ROLE IN THIS CONTRACT:CEI/Construction Administration/Construction Management Services 14.YEARS EXPERIENCE a.TOTAL:35 b.WITH CURRENT FIRM:3 15.FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Suite 410, Miami, FL 33126 16.EDUCATION (Degree and Specialization):Nova High School, Davie, FL 1976 17.CURRENT PROFESSIONAL REGISTRATION (State and Discipline) N/A 18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): 19.RELEVANT PROJECTS a. (1)TITLE AND LOCATION (City and State)SR 836 Design/Build (MDX 83622) – Miami-Dade Expressway Authority YEARS COMPLETED PROFESSIONAL SERVICES 2008 CONSTRUCTION 2012 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firmProject Manager of an eastbound auxiliary lane along Dolphin Expressway (State Road 836), from West of Northwest 57th Avenue to Northwest 42nd Avenue. The Project includes an outside auxiliary lane construction with bridge widenings at Northwest 57th Avenue, Tamiami (C-4) Canal and Northwest 45th Avenue, ITS relocation, milling and resurfacing, ramp modifications, guardrail installation, drainage improvements, retaining wall systems, lighting and signage modifications. Construction Amount: $16 Million. b. (1)TITLE AND LOCATION (City and State)NW 105th Way Bridge – Emergency Repair from US 27 (Okeechobee Road) to N.W. South River Drive YEARS COMPLETED PROFESSIONAL SERVICES 2013 CONSTRUCTION 2013 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Town of Medley in conjunction with FDOT. Construction Manager for this project with responsibilities that included repair bridge deck and barrier wall. Construction of barrier wall, guardrail, bridge expansion joints, mill and resurface asphalt, and pavement markings. c. (1)TITLE AND LOCATION (City and State)Pine Island Road from Oakland Park Boulevard to Commercial Boulevard – City of Sunrise, FL YEARS COMPLETED PROFESSIONAL SERVICES 2010 CONSTRUCTION 2011 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Construction Manager responsible for RFI’s, change orders, pay requests and plan interpretation for this project involving the reconstruction and widening of the existing 4-lane facility, to a 6-lane divided facility including bike lanes, sidewalk, 30-inch ductile iron (DIP) water main, drainage system, street lighting, signalization, landscaping, irrigation system, signing and pavement markings. d. (1) TITLE AND LOCATION (City and State)SR-934/ NW 79th Street Roadway Improvements Projects – FDOT District 6, City of Miami, FL YEARS COMPLETED PROFESSIONAL SERVICES 2014 CONSTRUCTION Ongoing (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ X ] Check if project performed with current firm Senior Project Engineer, overseeing this grouping project which consists of the roadway improvements including milling and resurfacing, signalizations, lighting, ADA improvements, drainage improvements, bridge traffic railing replacement, signing and pavement marking improvements on NW 79th street from 14th Avenue to North Bayshore Drive, NW 79th street from 14th Avenue to 28th Avenue, and NW 27th Avenue from NW 79th Street to NW 103rd Street e. (1) TITLE AND LOCATION (City and State)SR-836/I-395 Interim Project from NE 1st Avenue to MacArthur Causeway – FDOT District 6, Miami-Dade County, FL YEARS COMPLETED PROFESSIONAL SERVICES 2012 CONSTRUCTION 2015 (3)BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Engineer responsible for the inspection and contract administration of this project involving roadway and minor bridge upgrades on SR- 836 and I-395. The roadway and bridge improvements under the I-395 project consist of roadway and bridge widening, milling and resurfacing, retaining walls, barrier walls, signing, drainage, lighting, etc. STANDARD FORM 330 (REV. 3/2013) PAGE 2 2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME:Jenner Alfaro, P.E. 13.ROLE IN THIS CONTRACT:Senior Project Engineer (Construction Management CEI Services) 14.YEARS EXPERIENCE a.TOTAL:38 b.WITH CURRENT FIRM:10 15.FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 16.EDUCATION (Degree and Specialization):1987 Masters in Civil Engineering/ Purdue University, West Lafayette, IN 1977 Bachelors of Science in Civil Engineering/Universidad de Costa Rica, San Jose, Costa Rica 17.CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer: Florida 51855 (Civil) OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.): Florida Engineering Society, Transportation Construction Management Institute E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Adriana Savino-Miller Architecture - Master Planning a. TOTAL b. WITH CURRENT FIRM 30 26 15. FIRM NAME AND LOCATION (City and State) Savino & Miller Design Studio, P.A., North Miami, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION)17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) University of Pennsylvania, M. Arch + Urban Design Certificate Universidad Central de Venezuela, Architecture Registered Architect, Florida AR#14444 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) AIA Member 12 FLASLA Awards, among others 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED City of Miami Beach Future Community Park Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2016-present (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm Landscape Master Plan for this future community park project in Miami Beach. Scope included Paving, Planting, Site furniture and lighting. Principal - Master Planning b. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED Miami Baywalk & Riverwalk Design Guidelines Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2017-2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Design Guidelines and Brand Development for the Miami Baywalk and Riverwalk in Greater Downtown Miami Principal - Urban Designer c. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED Matheson Plantation Village Key Biscayne, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Master plan through the restoration of three historic cottages, a reminiscence of Key Biscayne when the Matheson Family donated land to the County. The plan calls for a sustainable village that exemplifies cultivation, conservation and stewardship of the land with activities that recall Key Biscayne’s past, including the zoo, first introduced by the Mathesons. Associate d. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED Museum Park Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2015 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Downtown Miami waterfront 20-acre park adjacent to two museums. $10M construction cost Principal - Master Planning e. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED Tamiami Canal Tender House Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2013 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmSite analysis and presentation of multiple options for site design, including whether to remove or replace the historic swing bridge, how many lanes for new bridge and relocation of tender house. Design of new tender house and bridge railing. Design Architect and Urban Designer E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 14. YEARS EXPERIENCE Barry R. Miller, ASLA 13. ROLE IN THIS CONTRACT Landscape Architecture a. TOTAL b. WITH CURRENT FIRM 34 26 15. FIRM NAME AND LOCATION (City and State) Savino & Miller Design Studio, P.A., North Miami, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION)17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) University of Florida ( Master Of Urban and Regional Planning) University of Florida (Bachelor in Landscape Architecture) Registered Landsape Architect: Florida #866 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) ASLA and ULI Member 12 FLASLA Awards, among other awards 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED Miami Baywalk & Riverwalk Design Guidelines Miami, FL PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2017-2019 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm Design Guidelines and Brand Development for the Miami Baywalk and Riverwalk in Greater Downtown Miami Principal - Landscape Architect b. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED Miami Beach Multi-Purpose Facility, 17 to 18 ST & Meridian AV Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2010 2012 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm Located adjacent to City Hall in the City of Miami Beach, scope included a Landscape and Streetscape Master plan linking new garage, City Hall and existing office building, through a bamboo promenade, an plaza, with a water feature. Scope included design of Paving, Planting, Water Feature, Lighting and urban furniture. From Schematic Design through Construction Phase Services.(19 Acres) Cost: $10M. Principal in Charge. 2015 FL ASLA Award of Merit. c. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETEDAventura Optima Professional Building Aventura, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2011 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm Landscape Master Plan and two green roof terraces. This is one of 2 buildings in South Florida to obtain Leed Platinum. Scope inluded Landscape plan, Hard-surface, Water Features, Outdoor lighting. From Schematic Design through Construction Phase Services.(19 Acres) Cost: $10M. Principal in Charge. 2015 FL ASLA Award of Merit.2015 Award of Excellence for Green Roof by Green Roof for Healthy Cities (NYC) d. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED SLS (Ritz Plaza Hotel) Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2012 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm Landscape Master Plan that included an entry courtyard with swimming pool and pool deck design . Planting, lighting, irrigation. From schematic Design thru Construction Phase Services.(19 Acres) Cost: $10M. Principal in Charge. e. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED Museum Park Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2012 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm Re-designed and valued engineered proposed Bay-walk and Entry promenade to keep integrity of original Concept. Scope included Paving, Planting, Irrigation, Urban furniture and lighting. From Schematic Design through Construction Observation Phase. (19 Acres) Cost: $10M. Principal in Charge. 2015 FL ASLA Award of Merit. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14.YEARS EXPERIENCE Jose Fonseca Landscape Architectural Designer a. TOTAL b. WITH CURRENT FIRM 7 8 months 15. FIRM NAME AND LOCATION (City and State) Savino & Miller Design Studio, P.A., North Miami, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION)17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Florida International University, MLA 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) ASLA Member 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED City of Miami Beach Future Community Park Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2016-present (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm Landscape Master Plan for this future community park project in Miami Beach. Scope included Paving, Planting, Site furniture and lighting. Project Designer b. (1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED Coral Gables Dog Park Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2016-present (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Streetscape improvements as part of Miami Beach’s initiative to raise West Avenue. Project Manager c. (1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED Akara Mixed-Use Tower Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2019-present (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm High-rise mixed-use tower in Downtown. SD-CA. Project Manager d. (1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED Atlanta Sobu Hotel Atlanta, GA PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2019-present (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Open space master plan and design for this condominium turned hotel in Atlanta Project Designer e. (1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED Midtown Miami Community Park Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmThe design of a new community park in Midtown Miami between high rise residential condominium EXLOGLQJV6SHFL¿FVFRSHLQFOXGHGVLWHSODQQLQJH[LVWLQJWUHHGLVSRVLWLRQDQGPLWLJDWLRQKDUGVFDSHOD\RXWDQGVLWHJUDGLQJ planting design, irrigation design, and landscape lighting design. Project Manager E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 14. YEARS EXPERIENCE Kelly Hitzing 13. ROLE IN THIS CONTRACT Project Manager - Architect a. TOTAL b. WITH CURRENT FIRM 72 15. FIRM NAME AND LOCATION (City and State) Savino & Miller Design Studio, P.A., North Miami, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION)17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) University of Virginia, MLA University of Tennessee, BFA Registered Landscape Architect, Florida 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED City of Miami Beach Future Community Park Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2016-present (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm Landscape Master Plan for this future community park project in Miami Beach. Scope included Paving, Planting, Site furniture and lighting. Project Manager. b. (1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED Sunrise Park Hallandale Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2018-present (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Neighborhood park as part of the GO Bond Project Manager c. (1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED West Avenue Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2017-present (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm Streetscape improvements for major thoroughfare in Miami Beach, West Avenue, and all of its side streets. Improvements are being done as Design-Build project to raise the street 1’-2’. Project Manager d. (1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED Bimini Land Use Plan and Design Guidelines Bimini, Bahamas PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2012 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Sixty page book of land use and design guidelines for Bahamian government to ensure sustainable future development for both local residents and expanding tourism industry on the island. e. (1) TITLE AND LOCATION (City and State)(2)YEAR COMPLETED 27 Star Island Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2012 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmWaterfront, Private residence E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13.ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Daniel Vasini Project leader - Architect a. TOTAL 13 lb. WITH CURRENT FIRM 11 15. FIRM NAME AND LOCATION (City and State) West 8 urban design & landscape architecture p.c. New York, NY 16.EDUCATION (Degree and Specialization) 17, CURRENT PROFESSIONAL REGISTRATION (State end Discipline) Southern California Institute for Architecture -Msc Architecture N/A Rafael Urdaneta University School of Architecture - Architecture Diploma 18. OTHER PROFESSIONAL QUALIFICATIONS (Puolications, Organizations, Training, Awards, etc.) Design for Miami Beach Soundscape. NY Chapter, 2015 New York ASLA; Honor Award landscape Architecture Design for Governors Island Phase 1 Park. NY Chapter, 2015 New York ASLA. a. b. C. d. e. 19.RELEVANT PROJECTS(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Pride Park -Miami Beach, Fl PROFESSIONAL SERVICES,CONSTRUCTION (If applicaole) 2016-2020 2020 (3) BRIEF DESCRIPTION (Brief scc,pe, size, cc,st, etc.) AND SPECIFIC ROLE 0 Check if project performed with current firm Pride Park is a 5.4 acre park, which is designed to host tented events such as Design Miami, and other activities. Cost - $8 million. West 8 was the Lead landscape Architects from concept design through construction; Mr. Vasini's role was Design Director -he lead the design effort and oversaw the documentation and construction phases. = (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED MBCC Public Spaces -Miami Beach, Fl PROFESSIONAL SERVICES,CONSTRUCTION (If applicaole) 2016-2020 2020 (3) BRIEF DESCRIPTION (Brief scc,pe. size, CCJSI, etc.) AND SPECIFIC ROLE 0 Check if project performed with current firm The 6 acres of landscape surrounding the newly constructed Miami Beach Convention Center was a $3.5 million effort, which includes a living shoreline and sculpture garden along Collins Canal. West 8 was the lead landscape Architects from concept design through construction; Mr. Vasini's role was Design Director -he lead the design effort and oversaw ........ ............ .-:ll_..., � ...... : ..... - ' (1) TITLE AND LOCATION (City and State) Oirschot Bridge -Oirschot, The Netherlands (3) BRIEF DESCRIPTION (Brief scc,pe, size, cc,st, etc.) AND SPECIFIC ROLE (2) YEAR COMPLETED PROFESSIONAL SERVICES,CONSTRUCTION (If applicao/e) 2012-2016 2020 0 Check if project performed with current firm The slow traffic bridge in Oirschot, a historical town in the south of The Netherlands, was opened in 2020. Conceived by West 8, the elegant and simple truss is ground-breaking in its use of wood as a primary material to span the 40 meter clearing across the Wilhelmina Canal. Mr. Vasini served as a lead designer on the project in the design phases. !! (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED Wenduine Bridge -Belgium PROFESSIONAL SERVICES,CONSTRUCTION (If applicaole) 2005 2014 (3) BRIEF DESCRIPTION (Brief scc,pe, size, cc,st, etc.) AND SPECIFIC ROLE 0 Check if project performed with current firm This 83m long bridge was commissioned as a Design Competition. West 8's design, which was deemed the best of the five plans submitted, harnesses the natural context, celebrates the site's historical significance and takes into consideration the existing spatial structure of the nearby 'Uitkerkse Paider. = (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED PROFESSIONAL SERVICES,CONSTRUCTION (If app/icaole) (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc.) AND SPECIFIC ROLE 0 Check if project performed with current firm STANDARD FORM 330 (REV. 8/2016) PAGE 2 E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CON TRACT 14. YEARS EXPERIENCE Adriaan Geuze Design Director - Architect a. TOTAL 35 lb. WITH CURRENT FIRM 30 15. FIRM NAME AND LOCATION (CityandState) West 8 urban design & landscape architecture p.c. New York, NY16. EDUCATION (Degree and Specialization) Wageningen University & Research Ir , Landscape Architecture, 1987 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Stichting Bureau Architectenregister, ASLA, OALA 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Prix-de-Rome. Maaskant Prize, Oeuvre Prize for Architecture of the Mondriaan Fund, Architect of the Year, ARC Oeuvre Award, Veronica Rudge Green Prize for Urban Design (Harvard Design School), and various awards from the American Society for Landscape Architecture a. b. C. 19.RELEVANT PROJECTS(1) TITLE AND LOCATION (City and state) (2) YEAR COMPLETED Roosendaal Pedestrian Bridge -Roosendaal, The Netherlands PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2012-2014 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [Z] Check if project performed with current firm Cost -$4.9 million. The bridge design is based on structural, functional and visual amenity determinants and a search for a strong character created by means of a simple construction. The proposed bridge provides an answer to this overall context by a balanced combination and integration of shape, structure and construction. Mr. Geuze served as the design lead on the project. (1) TITLE AND LOCATION (City and state) The Twist Bridge -Vlaadingen Vaart, The Netherlands (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (2) YEAR COMPLETED PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2005-2009 2009 [Z] Check if project performed with current firm The three-dimensional truss of the 42m long bridge, made from square steel profiles, twists on its horizontal axis. This twisted space frame construction absorbs the user in a continually changing experience of of perspective. The rectangular frame at the bridge entrance evolves into a double-height diamond form in the middle. Mr. Geuze served as the design lead on the project. (1) TITLE AND LOCATION (City and state) Oirschot Bridge -Oirschot, The Netherlands (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (2) YEAR COMPLETED PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2012-2016 202 0 [Z] Check if project performed with current firm The slow traffic bridge in Oirschot, a historical town in the south of The Netherlands, was opened in 2020. Conceived by West 8, the elegant and simple truss is ground-breaking in its use of wood as a primary material to span the 40 meter clearing across the Wilhelmina Canal. Mr. Geuze served as the design lead on the project. (1) TITLE AND LOCATION (City and state) (2) YEAR COMPLETED Wenduine Bridge -Belgium PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 2005 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [Z] Check if project performed with current firm d. . . . . .. . . . This 83m long bndge was commIssI oned as a Design CompetItIon. West S's design, which was deemed the best of the e. five plans subm itted, harnesses the natural context, celebrates the site's hist orical significance and takes into consideration the existing spatial structure of the nearby 'Uitkerkse Polder. Mr. Geuze served as the design lead on the project. (1) TITLE AND LOCATION (City and state) Borneo-Sporenburg -Amsterdam, The Netherlands (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (2) YEAR COMPLETED PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) 1993-1997 1997 [Z] Check if project performed with current firm The three bridges of Borneo/Sporenburg by West 8 play an essential role at the creation of the unique atmosphere in the harbour-residential area. Two of the bridges, one on the West side and the other on the East side, span the 93-meter wide water of the Railroad basin and connect the islands of Borneo and Sporenburg. The third bridge is situated in the line of the East bridge and spans the 25-meter wide inland port. Mr. Geuze served as the design lead on the project. STANDARD FORM 330 (REV. 8/2016) PAGE 2 12. NAME 13. ROLE IN THIS CONTRACT 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE b. WITH CURRENT FIRMa. TOTAL 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) 15. FIRM NAME AND LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 2 a. b. c. d. (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) e. Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Soheila Sadough ASA Consultants, Inc. - Surise Florida M.S.C.E, University of Alabama (1983) B.S.C.E. University of Alabama (1981) I-95 3C Design-Build Design-Build project with Demoya Archer western Joint Venture; ASA is working on five bridges (Steel Box Girders)within SR 84 Interchange; Ms Sadough is Structural EOR for these five bridges. This Design-Build project with Astaldi Construction provide access to and from NB and SB I-95 as well as Yamato Road to Spanish River Blvd which will improve access to FAU campus and relieve traffic on the adjacent Glades Rd & Congress Ave Interchanges. Ms. Sadough was the Structural Engineer of record for this design-Build project with Community Asphalt involving the replacement of existing bridges over FEC RR & Old Dixie Highway. ASA, as a Subconsultant to A2B, is performing quality control of plans & design calculations for Area 2-Downtown bridges. SR 9/I-95 Spanish River Blvd. Interchange Improvements Design-Build SR5/US1 Reconstruction & Widening Design-Build Project -4 Ultimate Design-Build Project Florida PE No. 44130 30 5 ✔ ✔ 2018 0n going 2016 2017 2014 20182017 2015 Bridge Design Peer Review E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Raul Amaya, PE a. TOTAL b. WITH CURRENT FIRM 34 1 Year 15. FIRM NAME AND LOCATION (City and State) ASA CONSULTANTS, INC. Sunrise, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION)17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) B.S.C.E, University of Miami Florida PE No. 38523 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (County)(2) YEAR COMPLETED SR9/ I-95 3C Design-Build Project, FDOT-D4 (Broward County) PROFESSIONAL SERVICES CONSTRUCTION (if applicable) On Going (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒Check if project performed with current firm ASA is the prime on this DB with Bergeron. This project involves widening the existing road and a new bridge (using the developmental PSU beams) over the cypress canal. Mr. Rodriguez serves as ASA’s deputy project manager and Engineer of Record for Roadway and Signing and Pavement Marking. Mr. Amaya is the SR. structural Engineer for this project helping with plan Production. b. (1) TITLE AND LOCATION (County)(2) YEAR COMPLETED Golden Gates Estates 8th Street NE DB Project | FDOT D1 – (FM 431895-1) (Collier County) PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2 Years (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒Check if project performed with current firm ASA is the prime on this DB with Bergeron. This project involves widening the existing road and a new bridge (using the developmental PSU beams) over the cypress canal. Mr. Amaya is the Sr. Structural Engineer for this project. c. (1) TITLE AND LOCATION (County)(2) YEAR COMPLETED Sunny Isles NB Emergency Bridge Miami Dade County PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2 Years (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Design and construction plans for emergency pedestrian bridge over inter coastal waterway . Mr. Raul Amaya helped with the design and bridge plans preparation. d. (1) TITLE AND LOCATION (County)(2) YEAR COMPLETED I-595 Reversible Lanes Design-Build project | FDOT D4 ( Broward County) PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 4 Years (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm As a sub consultant to AECOM on this high-profile $1.3B Design-Build project, Mr. Amaya was invol ved in structural design effort on Zones 1, 2, 3, 4 and 6. The structural design effor t consisted of final design and development of complete structural plans for Section1, 2 and 4 of this project corridor. e. (1) TITLE AND LOCATION (County)(2) YEAR COMPLETED I-75/I-595 Interchange, Phase 2 | FDOT D4 ( Broward County) PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 4 Years (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Three, twin-box girder bridges (Overall length 1,216 ft.) and two single box girder bridges (Overall length 3,612 ft.) Mr. Amaya was involved in the superstructure design of all segmental bridges. Bridge Design Peer Review E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Carlos M. Rodriguez, PE a. TOTAL b. WITH CURRENT FIRM 10 5 Years 15. FIRM NAME AND LOCATION (City and State) ASA CONSULTANTS, INC. Sunrise, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION)17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) MSCE, Florida International University Florida PE No. 79134 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) FDOT Specifications Training 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (County)(2) YEAR COMPLETED SR9/ I-95 3C Design-Build Project, FDOT-D4 (Broward County) PROFESSIONAL SERVICES CONSTRUCTION (if applicable) On Going (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒Check if project performed with current firm This Design-Build project with Archer Western & Demoya provides access from I-595 to I-95 express lanes. ASA Consultants is sub consultant to BCC is Structures EOR for five Bridges within I-95/ SR 84 Interchange. Mr. Rodriguez serves as a Project Engineer. b. (1) TITLE AND LOCATION (County)(2)YEAR COMPLETED Golden Gates Estates 8th Street NE DB Project | FDOT D1 – (FM 431895- 1) (Collier County) PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2 years 2018 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒Check if project performed with current firm ASA is the prime on this DB with Bergeron. This project involves widening the existing road and a new bridge (using the developmental PSU beams) over the cypress canal. Mr. Rodriguez is the roadway Engineer of Record c. (1) TITLE AND LOCATION (County)(2) YEAR COMPLETED SR 9/I-95 Spanish River Blvd. Interchange Improvements Design-Build Project l FDOT D4 ( Broward County) PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 3 Years 2016 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒Check if project performed with current firm This Design-Build project with Astaldi Construction provides access to and from NB and SB I-95 as well as Yamato Road to Spanish River Boulevard which will improve access to FAU campus and relieve traffic on the adjacent Glades Road & Congress Avenue Interchanges. The project requires extensive coordination with FAA, CSX and other local agencies. Ms. Sadough is Structures EOR & Project Manager responsible for all design and coordination with FDOT and the contractor during the various phases of plans preparation and is providing construction support services during construction. Mr. Rodriguez served as a Project Engineer. d. (1) TITLE AND LOCATION (County)(2) YEAR COMPLETED SR 15 RRR Project (Palm Beach County) PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2 Years (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☐ Check if project performed with current firm ASA serves as a sub to Propel which involves widening, milling and resurfacing and new guardrail along the project limits. Mr. Rodriguez was responsible for the Pavement Design. e. (1) TITLE AND LOCATION (County)(2) YEAR COMPLETED DW Misc. PE Design Services, FDOT D6 (Miami-Dade County) PROFESSIONAL SERVICES CONSTRUCTION (if applicable) On Going (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒Check if project performed with current firm DW MISC. PE Design (Prime) Mr. Rodriguez serves as the roadway Engineer of Record for multiple Task Work Orders Bridge Design Peer Review 12. NAME 13. ROLE IN THIS CONTRACT 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE b. WITH CURRENT FIRMa. TOTAL 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) 15. FIRM NAME AND LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 2 a. b. c. d. (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) e. Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Adrian Leon LARS Engineering, Inc. (Miami, Florida) BS Civil Engineering, Florida International University FHWA-NHI 130056 Safety Inspection of In-Service Bridges FHWA-NHI 130078 Fracture Critical Inspection Techniques for Steel Bridges Pedestrian Bridge Initial Inspection at Hard Rock Stadium, Miami, Florida Project Manager and Lead Inspector responsible for performing the initial inspection of a 207 ft. long steel truss pedestrian b ridge. Dates worked: 12/2019 to 01/2020; Project Contact: Giuliana Cox, PE (954) 934-1232. Project Manager and Bridge Inspector responsible for performing routine, interim, initial and emergency inspections of 365 bridges in Miami-Dade and Monroe counties. Dates worked: 07/2019 to Present; Project Contact: Sepehr Amiri, EI (305) 470-5251. Project Manager and Lead Inspector responsible for performing routine inspections of elevated rail fracture critical bridges and initial inspections of light poles at cargo buildings. Dates worked: 12/2019 to Present; Project Contact: Abel A. Oporto Jr.,PE (305) 869-3876 Project Manager and Lead Inspector performing bridge and ancillary structure inspections and reports processing. Dates worked: 10/16 to present; Project Contact: Eduardo Vazquez, EI, CBI (305) 261-6221. Lead Bridge Inspector responsible for performing inspections along the SR-5 through the Florida Keys for various types of bridges including the Seven-Mile Bridge. Dates worked: 07/2020 to Present; Project Contact: Sepehr Amiri, EI (305) 470-5251. FDOT D6 D/W Local Government In-Depth Bridge Inspection, Miami, FL Airport Structural Inspections, Miami-Dade Aviation Department (MDAD), Miami, FL Inspection & Reporting Services, Miami-Dade Expressway Authority, Miami, FL Districtwide In-Depth State Bridge Inspection, FDOT D6, Monroe County, FL Professional Engineer, Florida: 83827 Professional Engineer, Illinois: 062069631 Certified Bridge Inspector, Florida: 513 Certified Tunnel Inspector, Florida: 014 Senior Bridge Inspector 11 2.5 ✔ ✔ ✔ ✔ ✔ 12. NAME 13. ROLE IN THIS CONTRACT 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE b. WITH CURRENT FIRMa. TOTAL 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) 15. FIRM NAME AND LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 2 a. b. c. d. (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) e. Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Loren Marquez LARS Engineering, Inc. (Miami, Florida) BS Civil Engineering, Florida International University FHWA-NHI 130056 Safety Inspection of In-Service Bridges FHWA-NHI 130078 Fracture Critical Inspection Techniques for Steel Bridges In-House Support Structure Maintenance Office, Miami, Florida Quality Control Engineer and Bridge Inspector. Provides support as an extension of District 6 staff to the Bridge Unit includin g reviews, production and management for the structures inspection reports, invoicing & MOT Plans. Dates worked: 12/2019 to 01/2020; Project Contact: Pablo Orozco, PE (305) 470-5370 Bridge Inspector responsible for performing routine, interim, initial and emergency inspections of 365 bridges in Miami-Dade and Monroe counties. Dates worked: 07/2019 to Present; Project Contact: Sepehr Amiri, EI (305) 470-5251. Lead Inspector responsible for performing routine inspections of elevated rail fracture critical bridges and initial inspections of light poles at cargo buildings. Dates worked: 12/2019 to Present; Project Contact: Abel A. Oporto Jr.,PE (305) 869-3876 Lead Inspector performing bridge and ancillary structure inspections and reports processing. Dates worked: 10/16 to present; Project Contact: Eduardo Vazquez, EI, CBI (305) 261-6221. Lead Bridge Inspector responsible for performing inspections along the SR-5 through the Florida Keys for various types of bridges including the Seven-Mile Bridge. Dates worked: 07/2020 to Present; Project Contact: Sepehr Amiri, EI (305) 470-5251. FDOT D6 D/W Local Government In-Depth Bridge Inspection, Miami, FL Airport Structural Inspections, Miami-Dade Aviation Department (MDAD), Miami, FL Inspection & Reporting Services, Miami-Dade Expressway Authority, Miami, FL Districtwide In-Depth State Bridge Inspection, FDOT D6, Monroe County, FL Professional Engineer, Florida: 85631 Professional Engineer, South Carolina: 37407 Certified Bridge Inspector, Florida: 542 Certified Tunnel Inspector, Florida: 024 Senior Bridge Inspector 91 ✔ ✔ ✔ ✔ ✔ 12. NAME 13. ROLE IN THIS CONTRACT 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE b. WITH CURRENT FIRMa. TOTAL 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) 15. FIRM NAME AND LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 2 a. b. c. d. (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) e. Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Check if project performed with current firm (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 19. RELEVANT PROJECTS (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Randy Suarez LARS Engineering, Inc. (Miami, Florida) BS Civil Engineering, Florida International University FHWA-NHI 130056 Safety Inspection of In-Service Bridges for Professional Engineers FHWA-NHI 130078 Fracture Critical Inspection Techniques for Steel Bridges Pedestrian Bridge Initial Inspection at Hard Rock Stadium, Miami, Florida Quality Control Engineer responsible for reviewing the initial inspection report of a 207 ft. long steel truss pedestrian bridg e prior to submittal. Inspection was performed and report produced and submitted within 5 days due to requirements of the scope of work. Dates worked: 12/2019 to 01/2020; Project Contact: Giuliana Cox, PE (954) 934-1232. Quality Control Engineer and Bridge Inspector responsible for performing routine, interim, initial and emergency inspections of 365 bridges in Miami-Dade and Monroe counties. Dates worked: 07/2019 to Present; Project Contact: Sepehr Amiri, EI (305) 470-5251. QC Engineer and Lead Inspector responsible for performing routine inspections of elevated rail fracture critical bridges and initial inspections of light poles at cargo buildings. Dates worked: 12/2019 to Present; Project Contact: Abel A. Oporto Jr.,PE (305) 869-3876 Quality Control Engineer and Lead Inspector performing bridge and ancillary structure inspections and reports processing. Dates worked: 10/16 to present; Project Contact: Eduardo Vazquez, EI, CBI (305) 261-6221. QC Engineer and Bridge Inspector responsible for performing inspections along the SR-5 through the Florida Keys for various types of bridges including the Seven-Mile Bridge. Dates worked: 07/2020 to Present; Project Contact: Sepehr Amiri, EI (305) 470-5251. FDOT D6 D/W Local Government In-Depth Bridge Inspection, Miami, FL Airport Structural Inspections, Miami-Dade Aviation Department (MDAD), Miami, FL Inspection & Reporting Services, Miami-Dade Expressway Authority, Miami, FL Districtwide In-Depth State Bridge Inspection, FDOT D6, Monroe County, FL Professional Engineer, Florida: 78649 Senior Bridge Inspector 14 2.5 ✔ ✔ ✔ ✔ ✔ Erik Echezabal, PE, PTOE Project Engineer - Traffic 9 4 Choice Engineering Consultants, Inc (Miami, FL) MS in Civil Engineering Professional Engineer (FL) Professional Traffic Operations Engineer (FL) MOT Advanced Certificate IMSA Level III SR 9/I-95 at Hypoluxo Road Diverging Diamond Interchange - FDOT D4 Ongoing Since 2020 Serving as the signalization EOR for the full reconstruction of the SR 9/I-95 interchange at Hypoluxo Road, which will be converted to a diverging diamond interchange (DDI), in Palm Beach County. The scope of work includes new extended capacity/NEMA Type VI cabinet assemblies, new vehicle detection systems, full actuation, new mast arms, and pedestrian signalization at three signalized intersections. SR A1A/Collins Avenue/Indian Creek Drive Ride Rehabilitation Project - FDOT D6 SR 94 Kendall Dr / RRR From SW 132 Ave to SW 122 Ave - FDOT D6 Signal Retiming Services Consultant - FDOT D6 General Traffic Engineering Services (City of Kew West) Ongoing Since 2020 Ongoing Since 2018 Ongoing Since 2018 Ongoing Since 2018 Serving as the EOR for signalization and Temporary Traffic Control Plan (TTCP) for this project. This project includes upgrading the intersection from semi-actuated to fully actuated operations with microwave vehicle detection system (MVDS) and upgrading substandard pedestrian signalization to meet current MUTCD and FDOT standards. Serving as the Deputy Project Manager supporting with the overall management and performance of signal retiming services for over 1300 signalized intersection on the State Highway System and TSM&O initiatives. Erik served as the Project Engineer for the development of the Monroe County Traffic Signal System (MCTSS) Automated Traffic Signal Performance Measures (ATSPM) Implementation Plan for 49 signal controllers0 Erik supported the District Traffic Design Engineer with the development of MCTSS specific Signalization Design Notes and Guidelines. EOR responsible for analysis and design for the implementation of signalization improvements to this segment of Kendall Drive, which included 4 signalized intersection. Project improvements included design of a hybrid loop-video detection/VVDS system with the existing Econolite 2070LX signal controller and Centracs ASCT system and upgrading pedestrian signal features. This project required significant coordination with the maintaining agency due to limitations with the existing signal equipment which required special signal design and vast knowledge of the traffic control cabinet and controller system as this project required retrofitting the existing ASCT system. Responsible for developing the signal retiming recommendations for two city signals for the Weekday and Weekend AM, MD, PM, and PM-Off peak periods. He was also responsible for performing the database conversions for the NEMA TS1 ecosystems to the NEMA ATC ecosystem along with bench testing, and supported with the field integration of the NEMA ATC controllers and field implementation of the recommended signal timings. Erik inspected and verified that the Maintenance Contractor properly removed the existing NEMA TS1 controller with proposed NEMA ATC controller, properly reconnected the MS connectors (A, B, C, and D as applicable), tested field indications, and proper operation of signal controller. Horacio Lopez Traffic Designer 12 5 Choice Engineering Consultants, Inc (Miami, FL) High School Diploma D/W Misc. PE Design / D/W Lighting Improvements - FDOT D6 Ongoing Since 2019 Designer responsible for the production of construction plans for ten (10) projects scheduled through this contract. Involved in the production of engineering documents such as typical section package and utility coordination. In charge of plans production, Vvh coordination and electronic deliverables. Design traffic control plans for this rural segment of Overseas Highway. The scope of this project included upgrading existing lighting High Pressure Sodium (HPS) fixtures with Light Emitting Diode fixtures at signalized intersection and the addition of new light fixtures where lighting levels did not meet FDOT criteria throughout Miami-Dade County. This includes lighting for the pedestrian crossings to meet new minimum lighting levels. This is one of three D/W lighting contracts focused on a major Central Office safety initiative to improve the lighting at signalized intersections including crosswalks, and LED retrofit. ADA Districtwide Consultant - FDOT D6 Traffic Operations Safety Studies - FDOT D6 SR 94 Kendall Dr / RRR - FDOT D6 Signal Retiming Services Consultant - FDOT D6 Ongoing Since 2016 Ongoing Since 2018 Ongoing Since 2016 Ongoing Since 2017 Designer assisting in the production of push button type projects addressing ADA deficiencies in Miami-Dade and Monroe Counties. Improvements under these project types include minor milling and resurfacing, minor widening, minor drainage modifications, signing and marking and signalization improvements. Responsible for field reviews to asses such deficiencies and providing recommendations to improve deficient corridors. Designer assisting in the plans production and corridor modeling design for this 1-mile urban segment of Kendall Drive, in Miami-Dade County. The project improvements include milling and resurfacing, minor widening, signing and pavement marking, ADA compliance, minor lighting improvements and pedestrian signal improvements. This project required significant maintenance of traffic coordination with adjacent projects, to the west and the HEFT Interchange Improvements. Designer supporting the traffic engineering group in the development of conceptual improvement plans, design and construction cost estimates for traffic engineering studies throughout Miami-Dade and Monroe County. Responsible for identifying constructability issues, right-of-way, utility conflicts, roadway, drainage, signing and marking, lighting and signalization needs related to the proposed safety improvements. Designer supporting the traffic engineering group in signal retiming efforts for nearly 1300 signalized intersection along the State Highway System. Efforts include data collection and the development of concept level plans and exhibits for the projection of reports submitted for this contract. Olsen Deronvil Senior Designer - Traffic 9 1 Choice Engineering Consultants, Inc (Miami, FL) BS in Electrical Engineering (in progress) MOT Advanced Certificate IMSA Level II SR A1A/Collins Avenue NB & Indian Creek Drive SB–Ride-Only Project - FDOT D6 Ongoing Since 2020 Senior Designer responsible for the development of the signalization design of SR A1A/Collins Avenue NB and SR 907/63rd Street. This project included vehicular detection upgrade with Microwave detection, retrofitting existing cabinet assemblies with new vehicular and pedestrian detection, impacted pull boxes (traffic signal and lighting) replacement. NW 125 Street ACST Signalization Plans from NW 7 Ave to I-95 Ramps - FDOT D6 ADA Districtwide Consultant - FDOT D6 Traffic Operations Safety Studies - FDOT D6 Florida’s Turnpike Enterprise General Engineering Consultant - FTE Ongoing Since 2018 Ongoing Since 2019 Ongoing Since 2018 Ongoing Since 2018 Senior Designer responsible for coordinating with team members to develop the signalization design of the Adaptive Signal Control Plans along NW 125th Street from NW 7th Ave to NW 6th Avenue. This project included design of full actuation, Video or Microwave detection, retrofitting existing cabinet assemblies with new vehicular and pedestrian detection, the installation of Econolite Signal controller adaptive module, and adding manual transfer switch for the I-95 and 125th street cabinets. Senior Designer involved in the development of conceptual improvement plans, design and construction cost estimates for traffic engineering studies throughout Miami-Dade and Monroe County. Responsible for identifying lighting, and signalization needs related to the proposed safety improvements. Assisted with the production of the following study: Task #42_Safety Study and Lighting Study. Senior Designer responsible for the implementation/review of ADA improvements performed by the District, ADA Plan Reviews, preparation of construction plans for ADA only improvements to be constructed through the Work Program, technical memos addressing citizen and municipality complaints. Traffic Engineering Designer supporting the lead reviewer in all of the roadway lighting, tolling infrastructure electrical, and ITS plan reviews of all the TPK facility improvement projects including major re-construction of the Florida Turnpike Service Plazas, and Suncoast and Veterans Expressway Expansions. ADA Districtwide Consultant - FDOT D6 Ongoing Since 2015 Project Manager responsible for the review of ADA improvements performed by the District. This is a task work order driven contract that includes various services such as ADA Plan Reviews, preparation of construction plans for ADA only improvements to be constructed through the Work Program, technical memos addressing citizen and municipality complaints and requests such as APS requests and accessibility reviews. Responsible for providing annual ADA training to FDOT CEI Staff as well as municipal staff involved in the final acceptance of construction projects in Miami-Dade and Monroe Counties. Assisted the Department as an in-house consultant supporting the Intermodal Systems Development Office in the coordination of all ADA related activities. Misc. PE Design / Lighting Improvements - FDOT D6 SR 94 Kendall Dr / RRR From SW 132 Ave to SW 122 Ave - FDOT D6 Traffic Operations - FDOT D6 SR 5 US-1 / RRR & Safety - FDOT D6 Ongoing Since 2019 Ongoing Since 2018 Ongoing Since 2017 Ongoing Since 2017 Project Manager and EOR for this project to improve lighting levels at signalized intersections for pedestrian safety. This project is in response to changes in the lighting standards implemented in 2016 due to high pedestrian fatalities at inadequately lit intersections. Eleven task work orders along multiple state corridors in Miami-Dade County were assigned through this contract addressing lighting deficiencies associated to pedestrian crossings. This project has a fast-paced schedule and design required extensive field work, coordination with maintaining agency. Engineer of Record responsible for implementing all scoped improvements to this 1-mile urban segment of Kendall Drive, in Miami-Dade County. The project improvements include milling and resurfacing, minor widening, signing and pavement marking, ADA compliance, minor lighting improvements and pedestrian signal improvements. This project required significant maintenance of traffic coordination with adjacent projects, to the west and the HEFT Interchange Improvements. Engineer of Record responsible for the preparation of contract documents such as design variations, pavement designs and typical section packages as well as the production of construction plans for the implementation of traffic safety and operational improvements which included: new signalized intersections and existing signalizations improvements, addition of left turn lanes, extension of storage capacity, signing and pavement marking improvements throughout Miami-Dade County. 78 work orders completed under this contract. Project Manager of this contract responsible for implementing scoped improvements to this 2.25 mile urban segment of SR 94 in Miami-Dade County including milling and resurfacing, signing and pavement markings, ADA compliance (reconstruct substandard ramps, remove obstructions from sidewalk, and provide missing ramps), and pedestrian signal improvements. This project required significant maintenance of traffic coordination. Project Letting was February 2018. Winston Lucky, MSCE, EI, CGC Project Engineer - Traffic 27 2 Choice Engineering Consultants, Inc (Miami, FL) MS in Civil Engineering MOT Advanced Certificate SR 94 Kendal Dr / RRR From SW 132nd St to SW 122nd Ave - FDOT D6 Ongoing Since 2018 Lead Roadway Engineer responsible for the design of this 1-mile urban segment of Kendall Drive, in Miami-Dade County. The project improvements include milling and resurfacing, minor widening, signing and pavement marking, ADA compliance, minor lighting improvements and pedestrian signal improvements. This project required significant maintenance of traffic coordination with adjacent projects, to the west and the HEFT Interchange Improvements. ADA Districtwide Consultant - FDOT D6 Pedestrian Safety Study at SR 90/ SW 8 Street and SW 44 Ave - FDOT D6 SR 94 Kendall Dr / RRR - FDOT D6 Safety Study at SR 5/ US 1 at SW 137 Ave - FDOT D6 Ongoing Since 2018 Ongoing Since 2018 Ongoing Since 2018 Ongoing Since 2019 Project Engineer responsible for the implementation/review of ADA improvements performed by the District, ADA Plan Reviews, preparation of construction plans for ADA only improvements to be constructed through the Work Program, technical memos addressing citizen and municipality complaints. Assisted the Department as an in-house consultant supporting the Intermodal Systems Development Office in the coordination of all ADA related activities. Lead Roadway Engineer responsible for post design services implementing design changes prompted by contractor to this 2.25-mile urban segment of Kendall Drive, in Miami-Dade County including milling and resurfacing, minor widening, minor drainage improvements, bridge pier protection, signing and pavement markings, ADA compliance, minor lighting improvements and pedestrian signal improvements. This project required significant maintenance of traffic coordination with adjacent projects, MDX, CSX, Baptist Hospital and Dadeland Mall. Senior Roadway Engineer responsible for roadway and signing and pavement markings disciplines. Improvements include design of a new mid-block crossing, new signalized intersection, widening, milling and resurfacing, horizontal alignment improvements, signing and pavement markings. Improvements also includes addition of ADA ramps, driveway improvements, R/W acquisition, and Temporary Construction Easement agreements. Senior Roadway Engineer responsible for roadway and signing and pavement markings disciplines. Improvements include design for extending and widening the existing US 1 SB Left Turn Storage Lane at SW 137 Ave , new left turn lane between SW 252 Street and SW 137 Ave, new signalized intersection, widening, milling and resurfacing, horizontal alignment improvements, signing and pavement markings, addition and relocation of ADA ramps, and light improvements. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME Manuel G. Vera, Jr., PSM 13.ROLE IN THIS CONTRACT Principal / Chief Surveyor 14. YEARS EXPERIENCE a.TOTAL 36 b.WITH CURRENT FIRM 36 15.FIRM NAME AND LOCATION (City and State) Manuel G. Vera & Associates, Inc. Miami, FL 16.EDUCATION (Degree and Specialization) BS, Legal Studies, Nova Southeastern University, 1994 AS, Land Surveying, Miami Dade College, 1988 17.CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Surveyor & Mapper, Florida, PSM#5291 (1994) 18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Vera Jr. is a registered Land Surveyor with over 36 years of experience with the company and throughout the state of Florida, and has managed a variety of survey contracts and projects for the Florida Department of Transportation, Miami-Dade County, Miami- Dade Expressway Authority, City of Miami, and numerous Engineering and Design firms. He has performed and managed all types of surveying services including: Design Surveys, Right-of-Way Control Surveys, Right-of-Way Mapping, Platting, Construction Layout, As-built Surveys, Drainage Surveys, etc. Mr. Vera is a Senior Surveyor and Mapper as well as our Senior Project Manager. He has extensive experience in the management and coordination of survey projects involving a variety of surveying techniques such as Aerial Surveys, Conventional Ground Surveying, Utilities designation, etc. Professional Affiliation: FL Surveying & Mapping Society 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) SR A1A / Collins Avenue at 174th Street Pedestrian Bridge FDOT District 6 (Miami-Dade County, FL) (2) YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (If applicable) N/A (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm Chief Surveyor | MGV was responsible for providing a Design Survey consisting of the following deliverables: the establishment of horizontal (NAD 83/90) control as needed, and the creation of Topographic at the intersection of US-1 and 174th Street. All trees were located and identified with common names. Survey Cost: 3,000.00 b. (1)TITLE AND LOCATION (City and State) Pedestrian Bridge over Adams Cut FDOT District 6 (Key Largo, FL) (2) YEAR COMPLETED PROFESSIONAL SERVICES 2013 CONSTRUCTION (If applicable) N/A (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm Project Manager | MGV was to prepare a complete Design survey which included the establishment of horizontal (NAD 83/90) and vertical control (NAVD 88) networks, survey baseline and right of way, and the creation of Topographic surveys and Digital Terrain Model (DTM/3D). Survey Cost: $4,974.00 c. (1)TITLE AND LOCATION (City and State) Districtwide Right of Way Mapping & Survey (C-9M05) FDOT District 6 (Miami-Dade and Monroe County, FL) (2) YEAR COMPLETED PROFESSIONAL SERVICES On-Going CONSTRUCTION (If applicable) N/A (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm Project Manager | Task driven contract performing miscellaneous survey tasks in Miami-Dade and Monroe Counties, and all municipalities within the district. Recent tasks for Right of Way Mapping and Surveying services have included the preparation of Right of Way Control Surveys, Right of Way Control Maps, Right of Way Surveys, Right of Way Maps, Boundary Surveys, Geographic Information System (GIS) Mapping, preparation of Parcel Sketches and Legal Descriptions, Quality Assurance Reviews, Title Searches, Title Search Review, plotting Legal Descriptions, and miscellaneous surveying and mapping. Right of Way surveys may include, but not be limited to, the following: Geodetic Control / Project Network Control (PNC), Alignments, Section Ties, Subdivision Ties, Maintained Right of Way Survey, Building Ties, Jurisdictional Line Survey, and Side Street Surveys. $1.5 Million d. (1)TITLE AND LOCATION (City and State) Districtwide Continuing Services for Survey, Mapping, and SUE (C-9T24) FDOT District 4 (Districtwide: Broward, Martin, Indian River, Palm Beach & St. Lucie County FL) (2) YEAR COMPLETED PROFESSIONAL SERVICES On-Going CONSTRUCTION (If applicable) N/A (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm Assistant Project Manager | Task driven contract. Surveying and mapping services for this contract include: Mobile Lidar, Field Surveys, Maintenance of Traffic (MOT), Historical Baseline and Existing ROW Determination, Global Positioning System (GPS) Surveys, Monumentation Surveys, Bathymetric surveys (which includes single beam, multi beam and side scanner sonar capa- bilities), Utility Designation and Excavation (including Underwater Utilities), Tree Surveys, ROW Control Survey Maps, ROW Maps, Maintenance Maps, ROW Monumentation Maps, Boundary Surveys, Quality Assurance Reviews, Expert Witness Testimony, Title Search Plotting Maps, Title Document Review and Analysis, Sketched, Parcel Staking, and Legal Descriptions. $5 Million e. (1)TITLE AND LOCATION (City and State) Districtwide Right of Way Monumentation Consultant Contract (C-A146) FDOT District 6 (Miami-Dade and Monroe County, FL) (2) YEAR COMPLETED PROFESSIONAL SERVICES On-Going CONSTRUCTION (If applicable) N/A (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm Principal in Charge / QA/QC | Task driven contract performing Right of Way Monumentation and Right of Way Monumentation Mapping services in Miami-Dade and Monroe Counties, and all municipalities within the district. These services include, but are not limited to the preparation of Right of Way Control Surveys, Right of Way Maps, Boundary Surveys, Title Search Reviews, and Right of Way Monumentation to include annotation and recordation of Right of Way Maps once the Monumentation is complete. $1.5 Million STANDARD FORM 330 (REV. 8/2016) PAGE 2 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12.NAME Mark R. Sowers, PSM 13.ROLE IN THIS CONTRACT SUE Director / Chief Surveyor 14. YEARS EXPERIENCE a.TOTAL 32 b.WITH CURRENT FIRM 4 15.FIRM NAME AND LOCATION (City and State) Manuel G. Vera & Associates, Inc. Jupiter, FL 16.EDUCATION (Degree and Specialization) BS, Land Surveying, University of Florida, 1988 17.CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Surveyor & Mapper, Florida, PSM#5266 (1993)18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Sowers is a Professional Surveyor & Mapper with 32 years of experience throughout the state of Florida. His responsibilities include managing field operations and establishing standards for consultants as well as final quality assurance / quality control of all deliverables before client submission. He is proficient in the latest industry technology, as well as developing and implementing successful management strategies. Mr. Sowers worked for the Florida Department of Transportation (FDOT), District IV for eight years, four of them as District Surveyor. During his FDOT tenure, Mr. Sowers actively participated in statewide process improvements. He was a chairperson for FDOT’s Survey Technical Advisory Committee and a member of the committees responsible for the development and implementation of the staff-hour estimating form and project network control sheet. Professional Affiliation: Florida Surveying & Mapping Society 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) SR A1A / Collins Avenue at 174th Street Pedestrian Bridge FDOT District 6 (Miami-Dade County, FL) (2) YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (If applicable) N/A (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm Chief Surveyor | MGV was responsible for providing a Design Survey consisting of the following deliverables: the establishment of horizontal (NAD 83/90) control as needed, and the creation of Topographic at the intersection of US-1 and 174th Street. All trees were located and identified with common names. Survey Cost: 3,000.00 b. (1)TITLE AND LOCATION (City and State) Districtwide Right of Way Mapping & Survey (C-9M05) FDOT District 6 (Miami-Dade and Monroe County, FL) (2) YEAR COMPLETED PROFESSIONAL SERVICES On-Going CONSTRUCTION (If applicable) N/A (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm Chief Surveyor | Task driven contract performing miscellaneous survey tasks in Miami-Dade and Monroe Counties, and all municipalities within the district. Recent tasks for Right of Way Mapping and Surveying services have included the preparation of Right of Way Control Surveys, Right of Way Control Maps, Right of Way Surveys, Right of Way Maps, Boundary Surveys, Geographic Information System (GIS) Mapping, preparation of Parcel Sketches and Legal Descriptions, Quality Assurance Reviews, Title Searches, Title Search Review, plotting Legal Descriptions, and miscellaneous surveying and mapping. Right of Way surveys may include, but not be limited to, the following: Geodetic Control / Project Network Control (PNC), Alignments, Section Ties, Subdivision Ties, Maintained Right of Way Survey, Building Ties, Jurisdictional Line Survey, and Side Street Surveys. $1.5 Million c. (1)TITLE AND LOCATION (City and State) Districtwide Continuing Services for Survey, Mapping, and SUE (C-9T24) FDOT District 4 (Districtwide: Broward, Martin, Indian River, Palm Beach & St. Lucie County FL) (2) YEAR COMPLETED PROFESSIONAL SERVICES On-Going CONSTRUCTION (If applicable) N/A (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm Project Manager | Task driven contract. Surveying and mapping services for this contract include: Mobile Lidar, Field Surveys, Maintenance of Traffic (MOT), Historical Baseline and Existing ROW Determination, Global Positioning System (GPS) Surveys, Monumentation Surveys, Bathymetric surveys (which includes single beam, multi beam and side scanner sonar capa-bilities), Utility Designation and Excavation (including Underwater Utilities), Tree Surveys, ROW Control Survey Maps, ROW Maps, Maintenance Maps, ROW Monumentation Maps, Boundary Surveys, Quality Assurance Reviews, Expert Witness Testimony, Title Search Plotting Maps, Title Document Review and Analysis, Sketched, Parcel Staking, and Legal Descriptions. $5Million d. (1)TITLE AND LOCATION (City and State) Districtwide Right of Way Monumentation Consultant Contract (C-A146) FDOT District 6 (Miami-Dade and Monroe County, FL) (2) YEAR COMPLETED PROFESSIONAL SERVICES On-Going CONSTRUCTION (If applicable) N/A (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm Chief Surveyor | Task driven contract performing Right of Way Monumentation and Right of Way Monumentation Mapping services in Miami-Dade and Monroe Counties, and all municipalities within the district. These services include, but are not limited to the preparation of Right of Way Control Surveys, Right of Way Maps, Boundary Surveys, Title Search Reviews, and Right of Way Monumentation to include annotation and recordation of Right of Way Maps once the Monumentation is complete. $1.5 Million e. (1)TITLE AND LOCATION (City and State) Districtwide Right of Way Monumentation Consultant Contract (C-9D05) FDOT District 6 (Miami-Dade and Monroe County, FL) (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) N/A (3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X]Check if project performed with current firm Chief Surveyor | Task driven contract performing miscellaneous Location Surveys in Miami-Dade and Monroe Counties, and all municipalities within the district. MGV is responsible for the performance of Right of Way Monumentation and Right of Way Monumentation Mapping services. These services include, but are not limited to the preparation of Right of Way Control Surveys, Right of Way Maps, Boundary Surveys, Title Search Reviews, and Right of Way Monumentation to include annotation and recordation of Right of Way Maps once the Monumentation is complete. $1.5 Million STANDARD FORM 330 (REV. 8/2016) PAGE 2 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Oracio Riccobono, P.E. Geotechnical Engineer A.TOTAL B. WITH CURRENT FIRM 31 12 15. FIRM NAME AND LOCATION (City and State) GEOSOL, Inc.; 5795-A NW 151st Street, Miami Lakes, FL 33014 16. EDUCATION (Degree and Specialization)17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Civil Engineer (BSCE, 1983), Master Degree (MSCE in Geotechnical Engineering, 1985) at Louisiana State University and Master in Business Administration (MBA, 2000) at Florida International University Registration No. 49324 (Florida, Civil Engineering) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) American Society of Civil Engineers Florida Engineering Society 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED Areawide and Districtwide Geotechnical Consultant, FDOT Districts 4 and 6, over from Monroe to Osceola Counties PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2012 – 2019 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project Geotechnical Engineer responsible for negotiating each task work orders (TWO), planning the geotechnical exploration and laboratory testing programs, preparation of geotechnical engineering reports with foundation design and construction recommendations for new and existing roadway projects during Preliminary and Final Design phases. Project has budget cap of $1.50 millions. To date, we have successfully executed 450 TWO and have spent $3.0 millions. b. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED City of Doral Tile District Drainage Study, Doral, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2014 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project Geotechnical Engineer for the drainage study to identify improvements to reduce recurring flooding in a low-lying commercial area. Responsibilities included compilation of existing geotechnical exploration including soil and water sampling to screen for volatile organics, ammonia, metals, lead, aluminum, and iron; delineation of areal extent of undocumented landfill dumping activities and contamination; conceptual design of alternatives; responsible for planning geotechnical exploration and laboratory testing programs, preparation of geotechnical engineering report with foundation design and construction recommendations. c. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED City of Doral Basin H-8 Drainage Improvements Doral, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2016 2016 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project Geotechnical Engineer Responsibilities included geotechnical exploration, and identification of utility conflicts as well as planning the geotechnical exploration and laboratory testing programs, preparation of the geotechnical engineering report for exfiltration trench design. d. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED SR 826 over NW 25th Street Viaduct, Doral, FL, FDOT District 6. PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2011 - 2013 2011 - 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project Geotechnical Engineer responsible for planning geotechnical exploration and laboratory testing programs, preparation of geotechnical engineering report with foundation design and construction recommendations for the new bridge and retaining walls. Geotechnical fees were $250,000 e. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED J.C. Bermudez Park Recycled Stormwater Irrigation Project. Doral, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2010 2010 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project Geotechnical Engineer responsible for planning geotechnical exploration and laboratory testing programs, preparation of geotechnical engineering report with foundation design and construction recommendations for design of irrigation system for the 80-acre park. Major components included emergency lake intake structure, 2 MG above ground storage tank, 3,000 gpm storm water pump station, 130 micron disk filters with automatic backwash, bleach disinfection system, 1,400 gpm irrigation pumps, 8,000 feet of 12-inch diameter looped main, and irrigation system. STANDARD FORM 330 (6/2004) PAGE 2 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE Adnan Ismail, P.E. Geotechnical Engineer A.TOTAL B. WITH CURRENT FIRM 13 13 15. FIRM NAME AND LOCATION (City and State) GEOSOL, Inc.; 5795-A NW 151st Street, Miami Lakes, FL 33014 16. EDUCATION (Degree and Specialization)17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) M.S., Civil Engineering, (Geotechnical), Florida International Univ., 2012 B.S., Civil Engineering, Florida International University, 2006 Registration No. 76014 (Florida, Civil Engineering) 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) American Society of Civil Engineers Florida Engineering Society 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED Areawide and Districtwide Geotechnical Consultant, FDOT Districts 4 and 6, over from Monroe to Osceola Counties PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2012 – 2019 N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project Geotechnical Engineer responsible for negotiating each task work orders (TWO), planning the geotechnical exploration and laboratory testing programs, preparation of geotechnical engineering reports with foundation design and construction recommendations for new and existing roadway projects during Preliminary and Final Design phases. Project has budget cap of $1.50 millions. To date, we have successfully executed 450 TWO and have spent $3.0 millions. b. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED Hard Rock Stadium Pedestrian Bridges Bridge #1 Over NW 199th St. & Bridge #2 Over Turnpike Access Rd., City of Miami Gardens, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2018 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project Geotechnical Engineer responsible for planning geotechnical exploration and laboratory testing programs, preparation of geotechnical engineering report with foundation design and construction recommendations, foundation inspections, and foundation certifications. c. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED Pedestrian Bridge over US-1 Isla Morada, Monroe County, FL (FM: 442040-1) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2018 N/A (Scheduled for 2020) (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project Geotechnical Engineer responsible for planning geotechnical exploration and laboratory testing programs, preparation of geotechnical engineering report with foundation design and construction recommendations. d. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED SR 826 over NW 25th Street Viaduct, Doral, FL, FDOT District 6. PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2011 - 2013 2011 - 2013 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project Geotechnical Engineer responsible for planning geotechnical exploration and laboratory testing programs, preparation of geotechnical engineering report with foundation design and construction recommendations for the new bridge and retaining walls. Geotechnical fees were $250,000 e. (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED West Avenue Pedestrian Bridge and Lincoln Court Pedestrian Bridge Over the Collins Canal City of Miami Beach, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 2016 2017 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Project Geotechnical Engineer responsible for planning geotechnical exploration and laboratory testing programs, preparation of geotechnical engineering report with foundation design and construction recommendations, foundation inspections, and foundation certifications. STANDARD FORM 330 (6/2004) PAGE 2 AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (6/2004) Page 25 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.)12. NAMEGisele L. Colbert, MS, LEP 13. ROLE IN THIS CONTRACTPrincipal Scientist 14. YEARS EXPERIENCE a. TOTAL 25 b. WITH CURRENT FIRM 6 Years 15. FIRM NAME AND LOCATION (City and State) Smart-Sciences, Inc., Miami, FL 16.EDUCATION (DEGREE AND SPECIALIZATION) M.S., Biology; Post Graduate Studies in Environmental Law/Toxicology;B.S., Biology (minor in Chemistry) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) FL Licensed Environmental Professional #25 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)Ms. Colbert has more than 25 years of experience in managing and supervising technical projects and in leading inter-disciplinary teams consisting of engineers, geologists, ecologists and other technical experts. Ms. Colbert has extensive experience in all types of environmental permitting in the State of Florida (including Environmental Resource Permits (ERPs), Local Wetlands Permitting, Coastal Construction Permitting, Tree Permitting, Water Use Permit (WUP), industrial wastewater), as well as practical applications of wetland ecology and surface and groundwater hydrology in the South and Central Florida ecosystems. Her experience includes agency coordination, environmental permitting, wetland jurisdictional determinations and mitigation assessments, mitigation design and implementation, wetland monitoring and maintenance, benthic resource surveys, natural resource management, threatened and endangered species studies, habitat evaluation, conservation plans, water quality analysis, NEPA/PD&E environmental assessments, tree surveys, contamination assessments and remediation that consider both ecological and human health risks, GIS and training/teaching. Ms. Colbert is also a Licensed Environmental Professional and has performed numerous Phase I and II Environmental Site Assessments throughout the United States. Ms. Colbert has used this broad background and her project management skills to provide quality driven, technically sound solutions that meet the client’s needs in an efficient and cos- effective manner. Licensed Environmental Professional; Certified FDEP Stormwater, Erosion and Sedimentation Control Inspector; OSHA 40-Hour HAZWOPER/OSHA 8-HR Site Supervisor; PADI Open Water Diver; 40-Hour Course in Wetland Identification and Delineation (USACE Regulation IV program); and Florida UMAM Training, SFWMD, 2005 19. RELEVANT PROJECTS a. 1) TITLE AND LOCATION (City and State) Kendall Drive Rapid Transit PD&E, Environmental Studies 2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 - Ongoing CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmThis PD&E Study entails improving operational capacity primarily along SR 94/Kendall Drive/SW 88 Street through the implementation of premium transit service and infrastructure (i.e., Bus Rapid Transit (BRT), Light Rail Transit (LRT), Heavy Rail Transit (HRT), 'Hybrid' HRT (Heavy Rail with power supplied by either third rail or overhead lines), and other appropriate transit modal technologies. SR 94/Kendall Drive/SW 88 Street is a state-owned and maintained divided arterial running in the east-west direction. Smart-Sciences is preparing the Wetland Evaluation Report (WER) and Endangered Species Biological Assessment (ESBA) for the 10.7-mile project corridor. While the corridor is primarily urban, western areas are outside the Miami-Dade County Urban Development Boundary. Ms. Colbert is the Principal-in-Charge responsible for QA/QC of the WER and ESBA to be incorporated into the PD&E. b. 1) TITLE AND LOCATION (City and State) FDOT D6 – SR 25/Okeechobee Road from Countyline to East of 117th Avenue, Environmental Permitting 2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 – Ongoing CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmSmart-Sciences is working with project engineers to provide environmental services as required for FDOT District 6 SR 25/Okeechobee Road capacity improvement project within Miami-Dade County. Ms. Colbert is the environmental lead for this project. The project consists of traffic analysis and validation, capacity improvements to the mainline, Frontage Road, and entry/exit roads, along with milling and resurfacing. Smart- Sciences conducted GIS desktop analysis for listed species, contamination, and wetlands. Data harvesting was completed from PD&E study, South Florida Water Management District, United States Army Corps of Engineers, and Miami-Dade County data sources. Ms. Colbert led the wetland delineation along the corridor for direct and secondary impacts, in addition to functional assessments using Uniform Mitigation Assessment Method (UMAM). Smart-Sciences also assessed the project corridor for listed species and conducted preliminary surveys, i.e. wood stork and Florida bonneted bat. Staff prepared natural resources reports to support wetland permit applications and multi-agency coordination. Ms. Colbert conducted QA/QC of all work products. c. (1) TITLE AND LOCATION (City and State) City of Miami Beach, Neighborhood West, Phase I Environmental Site Assessment for Pump Station Improvements (2) YEAR COMPLETED PROFESSIONAL SERVICES 2014 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm project performed with current firm Ms. Colbert conducted a Phase I Environmental Site Assessment (ESA) in accordance with the ASTM standard E-1527-13 for the purpose of determining whether contamination may be present within the City’s right-of-way prior to replacing stormwater and wastewater pipes. The project is approximately 160 acres and is located between 5th Street and 20th Street and Alton Road to the Intracoastal in Miami Beach, Florida. The southern portion of the project area is a designated Brownfield Area historically known for automotive repair. The ESA activities included a site visit and reviews of historical Sanborn maps, city directories, aerial photographs, land use and regulatory records/database listings. The historic information gathered indicated that there were numerous drycleaners, gasoline stations, automotive repair shops and boat yards within the study area. The Phase I ESA identified twenty recognized environmental conditions, twenty-four historical recognized environmental conditions and one controlled recognized environmental condition in connection with the study area. This information is being used for planning purposes for stormwater and wastewater improvement projects within the City of Miami Beach. AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (6/2004) Page 26 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) d. 1) TITLE AND LOCATION (City and State) Hialeah Gardens Warehouse Development Environmental Permitting and Florida bonneted bat survey, Miami-Dade County (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 - Ongoing CONSTRUCTION (If applicable) N/A 3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firmMs. Colbert was project manager working with engineers, planners and architects to prepare two commercial warehouse development plans (Hialeah Gardens One and Two) on vacant parcels totaling 60 acres in Hialeah Gardens. The parcels consist entirely of low quality wetland habitat. Ms. Colbert conducted the wetland delineation, listed species survey, alternative sites/avoidance and minimization analysis and mitigation assessment using WATER to determine the mitigation required for permitting. This information was used to prepare the Joint SFWMD/USACE ERP and the Miami-Dade County Class IV permit applications for site development. As part of the permitting process the US Fish and Wildlife Service requested a Florida bonneted bat survey. A pedestrian survey of the entire site was conducted to look for tall trees with crevices/snags or palms with an appropriate crownshaft for bat roosting. Trees that were found to contain features for potential roosts were located using a Global Positioning System (GPS) unit and further examined with use of the Tree Top Peeper™ inspection system. The base of these trees were also inspected for bat guano. Additionally, a pedestrian survey was conducted at sunset for monitoring of vocalizations of the FBB. There were no observations made or vocalizations heard indicating that the FBB would be present within the project site. e. 1) TITLE AND LOCATION (City and State) Doral White Course Mixed Use Development, Environmental, Florida Bonneted Bat and Tree Permitting Services, Doral, Miami-Dade County 2) YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Ms. Colbert was the Principal-In-Charge working with engineers, planners and architects to prepare multi-use residential and commercial development plans for this 130-acre site in the City of Doral. The project consisted of an abandoned golf course with water bodies and palisades of trees. Ms. Colbert led the wetland delineation, listed species survey and tree survey within the project area. Based on the assessment of the regulations as well as the plants, soils and hydrology, it was concluded that no jurisdictional wetlands were present on the property. Ms. Colbert was successful in working with the USACE, SFWMD and Miami-Dade County to agree with the findings for no jurisdictional wetlands. Ms. Colbert led a survey for the Florida Bonneted Bat (FBB) using Wildlife Acoustic Song Meters and conducting pedestrian surveys. Based on the data analysis the FBB is not utilizing the site to roost or forage. Ms. Colbert also provided guidance to the Client regarding wood stork and eastern indigo snake. Under Ms. Colbert’s guidance approximately 1,700 trees were identified, in addition to recording height, canopy spread, diameter at breast height (DBH), and overall condition for each of the trees. Tree inventory data was integrated into project design and a tree removal and relocation permit was obtained from Regulatory and Economic Resources (RER). AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (6/2004) Page 25 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.)12. NAMEMeike de Vringer, MS 13. ROLE IN THIS CONTRACTStaff Scientist, GIS Specialist 14. YEARS EXPERIENCE a. TOTAL 3 b. WITH CURRENT FIRM 2.25 15. FIRM NAME AND LOCATION(City and State) Smart-Sciences, Inc., Miami, FL 16. EDUCATION(DEGREE AND SPECIALIZATION) M.S., Earth Sciences (University of Amsterdam); B.S., Earth Sciences(Vrije Universiteit), Amsterdam, the Netherlands. 17. CURRENT PROFESSIONAL REGISTRATION(STATE AND DISCIPLINE) OSHA 40-hour Health and Safety Training (2019) FDEP Stormwater Erosion and Sedimentation Control Inspector (2019) 18. OTHER PROFESSIONAL QUALIFICATIONS(Publications, Organizations, Training, Awards, etc.)Meike de Vringer has over three years of experience in ecological studies and Geographic Information Systems (GIS). Her ecological experience includes natural resource monitoring, pine rockland assessment, listed species surveys, acoustic recording analysis, wetland delineation, wetland functional assessments, tree surveys, exotic plant control and vegetative planning and planting. Ms. de Vringer has experience applying geographic analysis and technologies for GPS data conversion, processing high resolution imagery for analysis and basemap creation, natural resource management, vegetative planning and monitoring, evaluating habitat suitability of threatened and endangered species, remote sensing, and creating/managing geodatabases. Ms. de Vringer has experience conducting Phase I and II ESAs and routinely prepares applications for environmental permits to the USACE, SFWMD, FDEP and Miami-Dade County. Throughout the permitting process Ms. de Vringer coordinates with regulatory personnel to address questions and aid in moving the process along as expeditiously as possible. 19. RELEVANT PROJECTS a. 1) TITLE AND LOCATION (City and State) Vizcaya South Canal Restoration, Miami, Miami-Dade County, FL 2) YEAR COMPLETED PROFESSIONAL SERVICES 2018-Ongoing CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Smart-Sciences is providing environmental permitting services and contractor bidding coordination to the restoration of Vizcaya Museum and Gardens’ South Canal. To restore historic hydrologic conditions and enhance habitat for wildlife within the South Canal, dredging of approximately 1,100 cubic yards of accumulated sediment and trimming of mangroves is needed. Smart-Sciences is obtaining relevant permits from the USACE and Miami-Dade County to perform the dredging and mangrove trimming. Smart-Sciences prepared a bids package and obtained two bids from subcontractors. During coordination with subcontractors it was deemed desirable to analyze sediment prior to dredging for heavy metal content. Smart-Sciences prepared a Sediment Sampling Plan for review by Miami-Dade County Pollution Remediation Section. Ms. de Vringer coordinated with subcontractors at the Site and prepared the Sediment Sampling Plan. Ms. de Vringer conducted sediment sampling prior to dredging activities and prepared a technical report. The project is ongoing. b. 1) TITLE AND LOCATION (City and State) NW 102nd Avenue Roadway Improvements, Hialeah, Miami-Dade County, FL 2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 - Ongoing CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Smart-Sciences is providing environmental permitting services and contamination assessment services to the portion of NW 102nd Avenue between NW 162nd Street and NW 170th Street within the City of Hialeah proposed for roadway improvements as part of the Countyline Corporate Park development. Smart-Sciences prepared and submitted permit application packages with regulatory agencies. Ms. de Vringer conducted a wetland assessment to evaluate the acreage of the wetlands that exist within the proposed roadway footprint and a wildlife assessment to identify potential protected wildlife species using the corridor, as well as preparing the permit application packages and coordinating with the regulatory agencies. In addition, Smart-Sciences conducted a Phase I ESA identifying contamination issues of concern along the corridor. Ms. De Vringer conducted the online file review and prepared the Phase I ESA report. The primary concern found was adjacent landfill sites. Ms. De Vringer prepared a groundwater sampling plan and coordinated with Miami-Dade County Pollution Remediation Section for approval. The plan includes the installation of four groundwater monitoring wells to be sampled for ammonia, nitrates, sulfate, aluminum, iron, arsenic, and total dissolved solids. Ms. de Vringer provided oversight of installation and conducted sampling of groundwater and soils, and subsequently prepared a technical report for submittal to Miami-Dade County. c. 1) TITLE AND LOCATION (City and State) Little River Canal Bridge Replacement, Little Haiti, Miami-Dade County, FL 2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm MDC Public Works Department is proposing a complete replacement of the bridge at North Miami Avenue over Little River Canal, including roadway approaches. Smart-Sciences provided environmental services related to the project. Smart-Sciences performed an Ecological Due Diligence to assess the project construction zone for presence of wetlands and trees that would require a removal/relocation permit, submerged aquatic vegetation, as well as listed species habitat and use. Ms. de Vringer conducted the field investigation and evening pedestrian survey using acoustic recording equipment to determine if the Florida bonneted bat (FBB) is utilizing the project zone for roosting and/or foraging. Ms. de Vringer analyzed the acoustic data and prepared a technical report along with the figures in ArcGIS. No evidence of FBB usage of the project zone was found. Smart-Sciences provided a discussion regarding regulatory implications for identified environmental and wildlife constraints. d. (1) TITLE AND LOCATION (City and State) GR047 Homestead Air Reserve Base (HARB), Listed Species Assessment, Miami-Dade County, FL 2) YEAR COMPLETED PROFESSIONAL SERVICES 2018-2019 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (6/2004) Page 26 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) Smart-Sciences was contracted to provide biological support services prior to clearing of vegetation at the GR047 Site (±24.7-acres) located within the Homestead Air Reserve Base (HARB), in order to determine if flora and fauna listed as federally threatened or endangered under the U.S. Fish and Wildlife Service’s (USFWS) Endangered Species Act (ESA) of 1973, or species of concern or critical habitat are present on the Site and at risk for potential disturbance. Ms. de Vringer conducted a field assessment at the Site for listed plants species including Small’s milkpea (Galactia smallii), pineland croton (Croton linearis) and sand flax (Linum arenicola). HARB is located within the U.S. Fish and Wildlife Service consultation area for the federally endangered Florida bonneted bat (Eumops floridanus, FBB) which is known to roost within HARB. Smart-Sciences performed an FBB survey at the Site. Ms. de Vringer conducted a pedestrian survey of the project site to determine potential roost locations for additional survey using equipment such as Wildlife Acoustic song meters. Ms. de Vringer video-inspected mature trees with cavities for potential roosts presence. Acoustic song meters record bat echolocation and are used to inform as to whether bats are emerging from potential roosts, flying overhead or foraging. The song meter locations were determined through manual observations and inspections of tree crevices within the project site. Ms. de Vringer deployed song meters, evaluated recorded acoustic data for FBB presence, and prepared a listed species report. e. (1) TITLE AND LOCATION (City and State) BP Gratigny Environmental Permitting, Opa-locka, Miami-Dade County, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Smart-Sciences staff has prepared and submitted permit applications with regulatory agencies for a proposed development project located in Opa-locka, Miami-Dade County. The site is an approximate 24.95-acre site. Ms. de Vringer conducted wetland assessments to evaluate the acreage of the wetlands that exist on the property and a wildlife assessment to identify potential protected wildlife species using the site. The Uniform Mitigation Assessment Method (UMAM) and the Wetland Assessment Technique for Environmental Reviews (WATER) were utilized to evaluate the quality of the on-site wetlands and to assess the amount of mitigation required for wetland losses. Ms. de Vringer used ArcGIS to map wetlands and create figures, and prepared technical reports. She assisted in preparing the Natural Resources Report and permit applications to the regulatory agencies, and performed field visits with representatives of the regulatory agencies to verify wetland acreage and quality. The project is ongoing. AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (6/2004) Page 25 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.)12. NAMEAndrea Orozco, MS 13.ROLE IN THIS CONTRACTStaff Scientist, GIS Specialist 14.YEARS EXPERIENCE a. TOTAL 5 b. WITH CURRENT FIRM 2 15. FIRM NAME AND LOCATION (City and State) Smart-Sciences, Inc., Miami, FL 16. EDUCATION (DEGREE AND SPECIALIZATION) M.S., Integrated Environmental Science; B.S., Biological Sciences(minors in Integrated Environmental Science) 17.CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Certifications, 2017, PADI Open Water SCUBAFDEP Qualified Stormwater Management Inspector #42346OSHA 40-hour Health and Safety Training 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)Andrea Orozco has five years of experience in ecological and environmental studies, and Geographic Information Systems (GIS). Her ecologicalexperience includes natural resource monitoring, listed species surveys, wetland delineation, wetland functional assessments, tree surveys, batacoustic analysis, exotic plant control and vegetative planning and planting, performing water quality analysis, data collection, data base entry,saltmarsh/mangrove restoration, and seagrass surveys.. Ms. Orozco routinely prepares applications for environmental permits to the USACE,SFWMD, FDEP, Miami-Dade County and Broward County, and preparation of documents for PD&E studies. Ms. Orozco has experience in GIS mapcreations, creating/managing geodatabases, and collection of GPS data in the field. Ms. Orozco also performs soil and groundwater sampling as part of contamination assessments and assists in the preparation of Phase I and Phase II site assessment reports. FDEP Qualified Stormwater Management Inspector #42346, OSHA 40-hour Health and Safety Training, PADI Open Water Diver, CPR and First Aid 19. RELEVANT PROJECTS a. 1) TITLE AND LOCATION (City and State) NW 102nd Avenue Roadway Improvements, Hialeah, Miami-Dade County, FL 2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 - Ongoing CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Smart-Sciences is providing environmental permitting services and contamination assessment services to the portion of NW 102nd Avenue between NW 162nd Street and NW 170th Street within the City of Hialeah proposed for roadway improvements as part of the Countyline Corporate Park development. Smart-Sciences prepared and submitted permit application packages with regulatory agencies. Ms. Orozco assisted in preparing the permit application packages and coordinating with the regulatory agencies. In addition, Smart-Sciences conducted a Phase I ESA identifying contamination issues of concern along the corridor. Ms. Orozco conducted the online file review and prepared the Phase I ESA report. The primary concern found was adjacent landfill sites. Ms. Orozco prepared a groundwater sampling plan and coordinated with Miami-Dade County Pollution Remediation Section for approval. The plan includes the installation of four groundwater monitoring wells to be sampled for Ammonia, Nitrates, Sulfate, Total Dissolved Solids, Aluminum, Arsenic and Iron. Ms. Orozco assisted with the groundwater sampling efforts for the Phase II. b. 1) TITLE AND LOCATION (City and State) Pipeline Retrofits & In-line Inspections – 25 Miles of Jet Fuel Pipeline from Homestead to Miami International Airport, Miami-Dade County, FL 2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Smart-Sciences, Inc. (Smart-Sciences) provided environmental services to E2 Consulting Engineers, Inc. (E2) for the Pipeline Retrofits & In- line Inspections for the 25 Miles of Jet Fuel Pipeline from Homestead to Miami International Airport, Miami-Dade County, Florida. Smart- Sciences conducted desktop screening for the utility right-of-way (ROW) to identify waterbodies, wetlands, protected ecosystems, contaminated sites, listed species habitat and cultural/historical resources. Ms. Orozco conducted multiple Environmental Compliance Inspections for Stormwater Erosion and Sediment Control. Ms. Orozco drafted reports to identify erosion control issues and document compliance with applicable permits and permit conditions associated with each dig site. c. 1) TITLE AND LOCATION (City and State) Little River Canal Ecological Due Diligence & Acoustic Bat Survey, Miami, Miami-Dade County, FL 2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Smart-Sciences provided Ecological Due Diligence and a Florida Bonneted Bat (FBB) Preliminary Assessment for a 0.54-acre site. Little River Canal project is part of MDC Public Works Department bridge replacement. The Ecological Due Diligence was performed in order to assess the project area for presence of wetlands, trees that would require a removal/relocation permit, submerged aquatic vegetation, as well as listed species habitat and use. Ms. Orozco assisted in conducting pedestrian evening acoustic bat surveys and assessment of potential FBB habitat to determine if the FBB is utilizing the project zone for roosting and/or foraging. She also conducted an online review for potential contamination around the project area and assisted in preparing technical reports. No evidence of FBB usage of the project zone was found. d. (1) TITLE AND LOCATION (City and State) Future Civil and Probate Courthouse Phase I ESA and Site Assessment Report, Downtown Miami, Miami-Dade County, Florida 2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Smart-Sciences conducted a Phase I Environmental Site Assessment for a County-owned park located in downtown Miami. Ms. Orozco researched potentially contaminated sites, performed review of historical topographic maps and aerial imagery, prepared a technical report and created figures in ArcGIS. Miami-Dade County requested a Site Assessment Report (SAR) to be prepared for the Site based on the Site’s history. Smart-Sciences conducted extensive soil sampling (101 soil borings) and installed six permanent groundwater monitoring wells to AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (6/2004) Page 26 E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) assess soil and groundwater impacts for a wide range of contaminants including metals, petroleum products and pesticides. Ms. Orozco coordinated mobilization, collected soil and groundwater samples and assisted in preparing the SAR for submittal to Miami-Dade County. e. (1) TITLE AND LOCATION (City and State) Village of Key Biscayne Beach Renourishment Project Seagrass Mapping and Biological Monitoring. Key Biscayne, Miami-Dade County, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018-Ongoing CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Smart-Sciences conducted the pre- and post-construction biological monitoring for the Village of Key Biscayne Beach Renourishment Project within Miami-Dade County. This effort involved pre- and post-construction submerged aquatic vegetation (SAV) mapping and qualitative seagrass community surveys within the renourishment area to document the pre- and post-construction biological conditions, as well as at control sites for comparative measure. The seagrass mapping and qualitative seagrass community survey were conducted in accordance with the National Marine and Fisheries Service (NMFS) Recommendations for Sampling Halophila johnsonii and utilized the Braun Blanquet Cover Abundance Scale. Ms. Orozco led seagrass surveys for the project site and sampled 32 permanent transects. Ms. Orozco identified three seagrass species and recorded the percent cover by species, percent cover of seagrass, and total SAV % cover in a 1 m2 quadrat. Macroalgae species where also recorded. Ms. Orozco worked on the logistics for planning the benthic survey, conducted statistical analyses on the field data, and drafted the technical report for the project. Kenneth Hardin Venetian Causeway; Miami, FL 2014 2003 2015 1996 Ocean Avenue Bridge; Lantana, FL Flagler Memorial Bridge; Palm Beach, FL Sunset Island Bridge; Miami, FL Janus Research, Inc. (Tampa, FL) M.A.Cultural Resource Management B.A. Psychology and South Asian Studies Register of Professional Archaeologists Florida Archaeological Council Florida Trust for Historic Preservation Project Manager - Cultural Resources 39 39 Kathleen Hoffman Venetian Causeway; Miami, FL Ongoing 2003 2015 1996 Ocean Avenue Bridge; Lantana, FL Flagler Memorial Bridge; Palm Beach, FL Sunset Island Bridge; Miami, FL Janus Research, Inc. (Tampa, FL) Ph.D. Anthropology M.A.Anthropology B.A. Anthropology Florida Archaeological Council Register of Professional Archaeologists Principal Investigator 40 39 Amy Streelman Venetian Causeway; Miami, FL 2014 2003 2015 1996 Ocean Avenue Bridge; Lantana, FL Flagler Memorial Bridge; Palm Beach, FL Sunset Island Bridge; Miami, FL Janus Research, Inc. (Tampa, FL) M.H.P. Historic Preservation B.A. English Florida Trust for Historic Preservation National Trust for Historic Preservation Chief Architectural Historian 22 22 E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Vincent McNish, P.E., LEED AP, CxA 13. ROLE IN THIS CONTRACT Senior Mechanical Engineer 14. YEARS EXPERIENCE a. TOTAL 27 b. WITH CURRENT FIRM 19 15. FIRM NAME AND LOCATION (City and State) TLC Engineering Solutions, Inc. – Miami, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) Bachelor of Science in Mechanical Engineering Master of Science in Mechanical Engineering 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Florida, Mechanical P.E. #53287 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. McNish has over twenty-six years of experience in all phases of mechanical engineering analysis and design for HVAC systems for all building types including educational, commercial and industrial facilities. Plumbing experience involves commercial and residential building configurations, systems design and code compliance studies. Fire Protection designs include wet, dry and pre-action systems experience. 19.RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) City of Sunny Isles Beach Pelican Community Center Sunny Isles, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2008 CONSTRUCTION (if applicable) 2008 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm New two-story, 13,000 square foot community center building and a basketball/gymnasium building of approximately 9,900 square feet. The community center building is to include some offices, several multi-purpose spaces, a warming kitchen and a pantry for the use of caterers. The Gymnasium is to include a full-size basketball court and a snack bar area. $7.4 million / 23,000 sf Project Role: Senior Mechanical Engineer b. (1) TITLE AND LOCATION (City and State) City of Miramar Police Headquarters, Miramar, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (if applicable) 2017 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Design criteria for a new headquarters integrated into an existing parking garage structure. The new three-story structure will provide retail space at the ground floor and police department on the second and third floors. Provided security design for OnSSI Occularis CCTV. 80,000 sf Certified LEED NC 2009 Gold. Project Role: Senior Mechanical Engineer c. (1) TITLE AND LOCATION (City and State) Royal Caribbean Cruise Lines Ltd. Innovation Lab, Miami, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (if applicable) 2017 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Building expansion at Royal Caribbean's headquarters, including open space to build full-size mock-ups of proposed designs and ignition hubs to provide flexible space for large charrettes or multiday work sessions. A three-story virtual reality "cave" provides a visual representation of new features for future cruise ships. A pedestrian bridge on the second floor connects the lab to RCL's PortMiami headquarters building, which also underwent a 30,000 square foot renovation as part of this project. Design-build and Lean principles contributed to completing the project in just 10 months. Energy modeling estimated saving energy costs by 23.5% compared to ASHRAE 90.1-2007. 2016, AIA Palm Beach, Unbuilt Award of Merit, Non-Residential. LEED 2009 Silver Certified. $20 million / 20,000 sf. Project Role: Senior Mechanical Engineer d. (1) TITLE AND LOCATION (City and State) City of Miami Springs Aquatic Facility, Miami Springs, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (if applicable) 2015 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm New single-story aquatic support facility with 3,000 sf of pool equipment and locker room, a 400 sf concession space, 1,200 sf of administrative offices and a 4,000 sf multi-purpose room along with open air cabanas, pool and site lighting. $5 million / 8,600 sf. Project Role: Senior Mechanical Engineer e. (1) TITLE AND LOCATION (City and State) City of Miami Beach Parking Lots, Miami Beach, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (if applicable) 2015 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Electrical Lighting design for three parking lots (12X, 17X and 4D) along with the necessary foot candle calculations, photometrics and circuiting. The project also includes an irrigation system design to complement the landscaping design/$200,000/2015/TLC Prime. Project Role: Senior Mechanical Engineer E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Ralph Baeza, PE, MBA, MA., LEED AP 13. ROLE IN THIS CONTRACT Senior Electrical Engineer 14. YEARS EXPERIENCE a. TOTAL 37 b. WITH CURRENT FIRM 12 15. FIRM NAME AND LOCATION (City and State) TLC Engineering Solutions, Inc. – Miami, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) B.S. Electrical Engineering/MBA/ Universidad Nacional Autónoma de Honduras/M.A., Trinity International University Business Administration Organizational Leadership 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Florida, P.E. #42641 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Mr. Baeza is a registered professional engineer with over thirty years of experience, in all aspects of electrical engineering, project management and design in the building construction industry. Mr. Baeza background with engineering systems encompasses high, medium and low voltage power, normal and emergency power, lighting, fire alarm, telephone, television, public address, security, lighting protection, environmental control and building management for residential, commercial, institutional and industrial buildings. 19.RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) City of Miramar Police Headquarters Building Miramar, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (if applicable) 2017 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Design criteria for a new headquarters integrated into an existing parking garage structure. The new three-story structure will provide retail space at the ground floor and police department on the second and third floors. Provided security design for OnSSI Occularis CCTV. 80,000 sf Certified LEED NC 2009 Gold.Project Role: Senior Electrical Engineer b. (1) TITLE AND LOCATION (City and State) City of Miami Beach Bus Stop Shelters Miami Beach, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (if applicable) 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Prototype of a site adaptable bus shelter system (or module) for 197 sites. Project Role: Senior Electrical Engineer c. (1) TITLE AND LOCATION (City and State) Royal Caribbean Cruise Lines Ltd. Innovation Lab, Miami, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (if applicable) 2017 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Building expansion at Royal Caribbean's headquarters, including open space to build full-size mock-ups of proposed designs and ignition hubs to provide flexible space for large charrettes or multiday work sessions. A three-story virtual reality "cave" provides a visual representation of new features for future cruise ships. A pedestrian bridge on the second floor connects the lab to RCL's PortMiami headquarters building, which also underwent a 30,000 square foot renovation as part of this project. Design-build and Lean principles contributed to completing the project in just 10 months. Energy modeling estimated saving energy costs by 23.5% compared to ASHRAE 90.1-2007. 2016, AIA Palm Beach, Unbuilt Award of Merit, Non-Residential. LEED 2009 Silver Certified. $20 million / 20,000 sf. $20 million / 20,000 sf. Project Role: Senior Electrical Engineer d. (1) TITLE AND LOCATION (City and State) City of Miami Springs Aquatic Facility, Miami Springs, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (if applicable) 2015 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm New single-story aquatic support facility with 3,000 sf of pool equipment and locker room, a 400 sf concession space, 1,200 sf of administrative offices and a 4,000 sf multi-purpose room along with open air cabanas, pool and site lighting. $5 million / 8,600 sf. Project Role: Senior Electrical Engineer e. (1) TITLE AND LOCATION (City and State) Florida International University Sports Practice Fields Miami, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (if applicable) 2017 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm The project is to consist of the design for approximately 6,500 sf of additions and 34,000 sf of alterations to the existing clubhouse, approximately 40,500 GSF overall, located in Boynton Beach, Fl. $4 million / 40,500 sf. Project Role: Senior Electrical Engineer E.RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Manuel A. Mollinedo, PE, LEED Green Associate 13. ROLE IN THIS CONTRACT Design Engineer | Electrical 14. YEARS EXPERIENCE a. TOTAL 14 b.WITH CURRENT FIRM 6 15. FIRM NAME AND LOCATION (City and State) TLC Engineering Solutions, Inc. – Miami, Florida 16. EDUCATION (DEGREE AND SPECIALIZATION) Universidad Central de Las Villas, Cuba B.S., Electrical Engineering VEB Nachricht Electronic Engineering, Germany M.S., Microwave Link Communications 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) Florida, Electrical P.E. #63096 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) Manuel is a registered professional engineer in Florida and Virginia with more than 10 years of experience. He has experience in all aspects of electrical engineering including high, medium and low voltage power, normal and emergency power, lighting, fire alarm, telephone, television, public address, security, lighting protection, environmental control and building management for residential, commercial, institutional and industrial buildings. He has strong experience in project management and coordination with multiple disciplines. His project experience includes educational facilities, institutional projects and office space. 19.RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Broward College Parking Lot Lighting Davie, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2014 CONSTRUCTION (if applicable) 2014 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Development of electrical engineering design drawings for the lighting audit and assessment of 14 parking lots at Broward College. Additional services updates include parking lots J, L and M and associated entrance to campus Project Role: Electrical Design Engineer b. (1) TITLE AND LOCATION (City and State) City of Miramar Police Department Headquarters Miramar, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (if applicable) 2017 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Design criteria for a new headquarters integrated into an existing parking garage structure. The new three-story structure will provide retail space at the ground floor and police department on the second and third floors. Provided security design for OnSSI Occularis CCTV. 80,000 sf Certified LEED NC 2009 Gold. Role: Electrical Design Engineer c. (1) TITLE AND LOCATION (City and State) Royal Caribbean Cruise Lines Ltd. Innovation Lab, Miami, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION (if applicable) 2017 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Building expansion at Royal Caribbean's headquarters, including open space to build full-size mock-ups of proposed designs and ignition hubs to provide flexible space for large charrettes or multiday work sessions. A three-story virtual reality "cave" provides a visual representation of new features for future cruise ships. A pedestrian bridge on the second floor connects the lab to RCL's PortMiami headquarters building, which also underwent a 30,000 square foot renovation as part of this project. Design-build and Lean principles contributed to completing the project in just 10 months. LEED 2009 Silver Certified. $20 million / 20,000 sf. Project Role: Electrical Design Engineer d. (1) TITLE AND LOCATION (City and State) City of Miami Springs Aquatic Facility, Miami Springs, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2013 CONSTRUCTION (if applicable) 2015 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm New single-story aquatic support facility with 3,000 sf of pool equipment and locker room, a 400 sf concession space, 1,200 sf of administrative offices and a 4,000 sf multi-purpose room along with open air cabanas, pool and site lighting. $5 million / 8,600 sf. Project Role: Electrical Design Engineer e. (1) TITLE AND LOCATION (City and State) City of Miami Beach Bus Stop Shelters Miami Beach, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (if applicable) 2018 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Prototype of a site adaptable bus shelter system (or module) for 197 sites Project Role: Electrical Design Engineer Public Information 10 4Luz Weinberg GlobComm, LLC, 481 Ives Dairy Road, Miami, FL 33179 Psychology Major, Criminal Justice Minor Florida International University Magna Cum Laude Bachelors Degree N/A Public Information Public Information 2014 2016 The 9.1-acre mixed-use private development project by Swire Properties entailed construction of two residential stories, two office towers, one hotel, two levels of underground parking and three levels of open-air retail enveloped by a first of its kind "Climate Ribbon" roof - an environmental feat that demanded careful coordination for construction materials deliveries through busy Downtown Miami streets; and project also involved two overhead mall-pedestrian crosswalks over South Miami Avenue and 7th Street. As PIO for the prime contractor, Americaribe-Moriarty Joint Venture, Ms. Weinberg led and sucessfully delivered all internal and external communications with the hundreds of employees and numerous residential and commercial project stakeholders. 2021 Impact Mitigation Impact Mitigation 2021 Seritage Growth Properties' Esplanade at Aventura sits on the former Sears Aventura site on 195th Street and U.S.1. The 12-acre private project and latest development in the city brings two levels of underground parking the six new buildings of open-air, luxury retail, entertainment, dining and commercial businessness. Unilt the project construction paused in 2020 due to COVID, Ms. Weinberg's role has focused on agency coordination with the county, FPL and AT&T activities coordination, and stakeholder management issues to mitigate any potential schedule and budget impact. 2025 The $1B Project Scope entailed widening of the MacArthur Causeway, addition/development of two lanes of traffic on the MacArthur bridge for tunnel access and construction of twin tubes underneath Government Cut (Biscayne Bay), the latter of which demanded the hauling of over 400,000 cy of excavated soil via a temporary overhead structure on the MacArthur Causeway. As PIO for the prime contractor, Bouygues, Ms. Weinberg led and successfully delivered all internal and external project communications with thousands of employees and numerous stakeholders, ensuring project trust with all concerned, particularly public agencies and the client: Florida Department of Transporation, Miami-Dade and City of Miami. The Port of Miami Tunnel, Miami, Florida Brickell City Centre, Miami, Florida Esplanade at Aventura Project, Aventura, FL The Shoppes at Westland Mall, Hialeah, FL Site C Clean Energy Project, Fort St. John, BC, Canada PIO Technical Review / Safety Campaign Peace River Hydro Partners Joint Venture (PRHP), the prime contractor for this $2B-CAN third dam and hydroelectric generating station on the Peace River in BC retained Ms. Weinberg for technical review and assistance with its monthly construction progress report for its public entity client, the indigenous and wildlife stakeholders impact mitigation plan review, and the development of a Safety Campaign, which she titled "I'm Dam Safe" and also trained 30 project managers to train their employees on project safety. Dam construction is still underway and this contract ran from April 2017 to December 2018. Seritage Growth Properites' Shoppes at Westland Mall sits on the former Sears Hialeah site on West 49th Street and 16th Avenue. This private development will complement the existing Westland Mall with new, luxury retail, entertainment and dining businesses. Until the project paused due to COVID concerns in 2020, Ms. Weinberg's role has focused on city and county agency coordination for mitigation of potential schedule and budget impact to the project. F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER (1) 21. TITLE AND LOCATION (City and State) Hard Rock Stadium Pedestrian Bridges Design 22. YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) 2020 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNERCity of Miami Gardens b. POINT OF CONTACT NAMELes Pettit c. POINT OF CONTACT TELEPHONE NUMBER305-622-8000 24.BRIEF DESCRIPTION OF PROJECT AND REVELANCE TO THIS CONTRACT (Include scope, size, and cost) EAC as a Sub to Bentley has just completed the design of two pedestrian bridges to facilitate pedestrian access to and from the Hard Rock Stadium which can hold up to 60,000 spectators. One of the proposed bridges, with a span length of 151’-11” and a width of 14’-0”, will be over NW 199th Street on the south side of the stadium and the other, with a span length of 206’-11”and a width of 14’-0”, will be over the Turnpike Access Road on the east side. The superstructure for both bridges was designed by Contech Engineered Solutions LLC and will be a variable depth walk-thru steel truss with a cast-in-place concrete deck. The bridges approach ramps will have pedestrian walkways supported by wrap- around MSE walls, as well as stairs at the ramp entrances to facilitate pedestrian access during sports events. Construction on this fast track Design-Build project has already started in mid-January 2019 and is scheduled for completion by the end of September 2019 – just in time for the onset of the NFL regular season and five months before the stadium hosts Super Bowl LIV. EAC provided design services for the two pedestrian bridges substructures and for the MSE wall control drawings for the ramps at both bridge approaches. With a very aggressive schedule on this job, EAC was able to meet all of the design submittals deadlines. EAC is currently providing Post-Design services for the bridges and MSE walls related items. 25.FIRMS FROM SECTION INVOLVED WITH THIS PROJECT a. (1)FIRM NAME EAC Consulting, Inc. (2) FIRM LOCATION (City and State) Miami, FL (3) ROLE Prime b. (1)FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE c. (1)FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1)FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1)FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. (1)FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 - EAC Consulting, Inc. Page 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER (2) 21.TITLE AND LOCATION (City and State) Snake Creek Pedestrian Bridge, North Miami Beach, Florida 22.YEAR COMPLETED PROFESSIONAL SERVICES 2008 CONSTRUCTION (If applicable) 2009 23.PROJECT OWNER’S INFORMATION a.PROJECT OWNERCity of North Miami Beach b.POINT OF CONTACT NAMEEsmond Scott c.POINT OF CONTACT TELEPHONE NUMBER(305)948-292524.BRIEF DESCRIPTION OF PROJECT AND REVELANCE TO THIS CONTRACT (Include scope, size, and cost) The new pedestrian bridge crossing the Snake Creek (C-9) Canal at Challenger Park in North Miami Beach replaced a timber structure that was decades old and in dire need of repair. So much so, that the timber structure was closed to traffic for a number of months before its demolition. EAC Consulting assessed the costs of repairing and continued maintenance versus replacing. The economics overwhelmingly proved that replacement would be in the City's best interest. This new structure, scheduled to open for pedestrian traffic in early July 2008, will re-establish a vital link between the communities lining the banks of the canal seeking to gain access to local houses of worship, schools and all-around general use. The new crossing has design life of 75+ years. Cost: $750,000 (Construction Cost) 25. FIRMS FROM SECTION INVOLVED WITH THIS PROJECT a. (1)FIRM NAMEEAC Consulting, Inc. (2)FIRM LOCATION (City and State) Miami, FL (3) ROLEPrime b. (1)FIRM NAME (2)FIRM LOCATION (City and State)(3) ROLE c. (1)FIRM NAME (2)FIRM LOCATION (City and State)(3) ROLE d. (1)FIRM NAME (2)FIRM LOCATION (City and State)(3) ROLE e. (1)FIRM NAME (2)FIRM LOCATION (City and State)(3) ROLE f. (1)FIRM NAME (2)FIRM LOCATION (City and State)(3) ROLE STANDARD FORM 330 - EAC Consulting, Inc. Page 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER (3) 21.TITLE AND LOCATION (City and State) NW 21st Street Avenue Pedestrian Bridge Over C-13 Canal, Oakland, FL 22.YEAR COMPLETED PROFESSIONAL SERVICES 2012 CONSTRUCTION (If applicable) 2013 23.PROJECT OWNER’S INFORMATION a.PROJECT OWNER Broward County Highway Constructionand Engineering Division b.POINT OF CONTACT NAME Richard Tornese, PE c.POINT OF CONTACT TELEPHONE NUMBER 954-577-4579 24.BRIEF DESCRIPTION OF PROJECT AND REVELANCE TO THIS CONTRACT (Include scope, size, and cost) EAC provided Project Management and Civil Engineering services for the NW 21st Avenue Pedestrian Bridge. The bridge provides safe access for pedestrians across the C-13 canal and prevents members of the community from having to share the existing adjacent roadway bridge and an old pedestrian bridge, which is in a state of disrepair. The project stakeholders included the South Florida Water Management District (SFWMD), Broward County and the City of Oakland. The project features include a prefabricated aluminum bridge with concrete abutments and ADA accessibility. Safety features include lighting and a closed caption television (CCTV) system for security. Cost: $ $84,447.00 (Contract Value) 25. FIRMS FROM SECTION INVOLVED WITH THIS PROJECT a. (1)FIRM NAME EAC Consulting, Inc. (2)FIRM LOCATION (City and State) Miami, FL (3) ROLE Prime b. (1)FIRM NAME (2)FIRM LOCATION (City and State)(3) ROLE c. (1)FIRM NAME (2)FIRM LOCATION (City and State)(3) ROLE d. (1)FIRM NAME (2)FIRM LOCATION (City and State)(3) ROLE e. (1)FIRM NAME (2)FIRM LOCATION (City and State)(3) ROLE f. (1)FIRM NAME (2)FIRM LOCATION (City and State)(3) ROLE STANDARD FORM 330 - EAC Consulting, Inc. Page 3 F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER (4) 21.TITLE AND LOCATION (City and State)Downtown Government Center Station (All Aboard Florida)22.YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 23.PROJECT OWNER’S INFORMATION a.PROJECT OWNERCGC/Brightline b.POINT OF CONTACT NAMERobert Cortes c.POINT OF CONTACT TELEPHONE NUMBER305-520-2470 24.BRIEF DESCRIPTION OF PROJECT AND REVELANCE TO THIS CONTRACT (Include scope, size, and cost) EAC provided structural design services for the Miami Central Station Rail Infrastructure and Rail Viaduct, and also provided post-design support. The viaduct is an elevated guideway structure, built 50 feet above ground for AAF and Tri-Rail passenger trains. EAC collaborated with New York City architectural firm Skidmore, Owings, & Merrill (SOM) on the design of one of the viaduct’s most prominent features, the distinctive V-shaped columns which enhance the aesthetics and open layout of the station’s entrance. In order to maintain the station’s high- quality environment, EAC’s design also employs context-sensitive vibration impact mitigation, which would prevent train vibration from spreading into the station area. As an integrated component of the Miami Central Station, the design of the viaduct is an example of the sensitive balance of aesthetic form and function. Total Construction: $1.5 Billion 25.FIRMS FROM SECTION INVOLVED WITH THIS PROJECT a. (1)FIRM NAME EAC Consulting, Inc. (2) FIRM LOCATION (City and State) Miami, FL (3) ROLE Prime b. (1)FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE c. (1)FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1)FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1)FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. (1)FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE STANDARD FORM 330 - EAC Consulting, Inc. Page 3 F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20.EXAMPLE PROJECT KEY NUMBER(5) 21.TITLE AND LOCATION (City and State)MERIDIAN AVENUE OVER COLLINS CANAL (FICE 2000 Engineering Excellence Award, 2000 FTBA Best in Construction Award) Miami, FL 22.YEAR COMPLETED PROFESSIONAL SERVICES 2001 CONSTRUCTION (If applicable) 2002 23.PROJECT OWNER’S INFORMATION a.PROJECT OWNERFlorida Department of Transportation-District 6 b.POINT OF CONTACTNAME Adriana Manzanares c.POINT OF CONTACT TELEPHONE NUMBER(305)470-5283 24.BRIEF DESCRIPTION OF PROJECT AND REVELANCE TO THIS CONTRACT (Include scope, size, and cost) EAC Consulting, Inc. provided the bridge replacement design services for the Meridian Avenue Bridge over Collins Canal. The project required coordination with the adjacent Holocaust Memorial to incorporate aesthetic treatments. The improvements included: roadway, drainage, signalization, lighting and maintenance of traffic. Specifically, the project included the following: 1.Replacement of the bridge over Collins Canal. 2. Reconstruction of the south approach Meridian Avenue roadway. The reconstruction included the removal of on street parking; thereby allowing for an increase in the width of the west sidewalk. The final roadway configuration included two northbound lanes (one as a turn lane) and one southbound lane. 3.Aesthetic/streetscape improvements included: pigmented cement pavers for the roadbed and bridge, stone pavers for the sidewalk, stone veneer for the vertical surfaces of the bridge, and decorative lighting 4. Drainage improvements included the installation of a drainage well to dispose of the contaminated water prior to discharge into the Collins Canal. 5.Signalization and non-decorative roadway lighting. 25.FIRMS FROM SECTION INVOLVED WITH THIS PROJECT a. (1)FIRM NAME EAC Consulting, Inc. (2)FIRM LOCATION (City and State) Miami, FL (3)ROLE Prime b. (1)FIRM NAME (2) FIRM LOCATION (City an d State)(3) R OLE c. (1)FIRM NAME (2) FIRM LOCATION (City and State)(3) R OLE d . (1)FIRM NAME (2) FIRM LOCATION (City and State)(3) R OLE e . (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) R OLE f. (1)FIRM NAME (2) FIRM LOCATION (City and State)(3) R OLE SF330Project Experience - EAC Consulting, Inc. F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20.EXAMPLE PROJECT KEY NUMBER(6) 21.TITLE AND LOCATION (City and State)VENETIAN CAUSEWAY IMPROVEMENTSMiami, FL 22.YEAR COMPLETED PROFESSIONAL SERVICES 2012 CONSTRUCTION (If applicable) 23.PROJECT OWNER’S INFORMATION a.PROJECT OWNERFDOT District Six b.POINT OF CONTACTNAME Dat Huynh, PE c.POINT OF CONTACT TELEPHONE NUMBER(305)470-5217 24.BRIEF DESCRIPTION OF PROJECT AND REVELANCE TO THIS CONTRACT (Include scope, size, and cost) EAC Consulting, Inc. is currently providing a Project Development & Environment (PD&E) study to examine the potential replacement or rehabilitation of the twelve existing bridges (ten low-level fixed spans and two movable bascules) along the Venetian Causeway from North Bayshore Drive to Purdy Avenue. The Venetian Causeway bridges were originally built in 1926 and have been designated as historic landmarks by the City of Miami and City of Miami Beach; they are also listed on the National Register of Historic Places (NRHP). The causeway bridges are mainly short span reinforced concrete arch beam bridges. Each bridge section consists of two 12' travel lanes with 4' bike lanes and 4' sidewalks on each side. Project requirements include the inspection of the bridges, engineering reports, environmental documents, a Section 4(f) document and preliminary plans. Improvements include the possible replacement or rehabilitation of the functionally obsolete structures based on the latest criteria and standards. Extensive public involvement efforts are being done as part of this study. The PD&E study will look at alternatives that satisfy the public; protect the environment; are sensitive to the historic designation; result in bridges that are safe, maintainable and serve the needs of the public. 25.FIRMS FROM SECTION INVOLVED WITH THIS PROJECT a. (1)FIRM NAME EAC Consulting, Inc. (2) FIRM LOCATION (City and State) Miami, FL (3)ROLE Prime b. (1)FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE c. (1)FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE d. (1)FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE e. (1)FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20.EXAMPLE PROJECT KEY NUMBER(7) 21.TITLE AND LOCATION (City and State) MetroZoo Aviary -Miami, FL 22.YEAR COMPLETED PROFESSIONAL SERVICES N/A CONSTRUCTION (If applicable) 2003 23.PROJECT OWNER’S INFORMATION a.PROJECT OWNERMiami – Dade County parks andRecreation Department b.POINT OF CONTACTNAME Michael Yaskin c.POINT OF CONTACT TELEPHONE NUMBER(305) 755-7816 24.BRIEF DESCRIPTION OF PROJECT AND REVELANCE TO THIS CONTRACT (Include scope, size, and cost) EAC Consulting, Inc. was responsible for the utilities design and construction management services for the Miami-Dade Parks & Recreation Metroozoo - “Wings of Asia” Aviary. This project involves the extension, connection and permitting of water and sanitary sewer service for the Aviary. The project requires the determination of the existing pump station capacity at the Metrozoo and the ability to handle the new loads from the Aviary. A 12” water main extension was provided as well as a connection to an existing main. EAC’s responsibility also included the design of drainage systems for the Aviary, the paving and grading of the entrance driveways into the Aviary, and the pedestrian bridges on the project. PROJECT COST: $3.5 million PROJECT FEES: $55,000 25.FIRMS FROM SECTION INVOLVED WITH THIS PROJECT a. (1)FIRM NAME EAC Consulting, Inc. (2) FIRM LOCATION (City and State) Miami, FL (3) ROLE Prime b. (1)FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE c. (1)FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE d. (1)FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE e. (1)FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE f. (1)FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE SF330Project Experience - EAC Consulting, Inc. 25.FIRMS FROM SECTION INVOLVED WITH THIS PROJECT a. (1)FIRM NAME EAC Consulting, Inc. (2) FIRM LOCATION (City and State) Miami, FL (3) ROLE Prime b. (1)FIRM NAME (2)FIRM LOCATION (City and State)(3) ROLE c. (1)FIRM NAME (2)FIRM LOCATION (City and State)(3) ROLE F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20.EXAMPLE PROJECT KEY NUMBER(8) 21.TITLE AND LOCATION (City and State) Tamiami Canal Historic Swing Bridge PD&E, NW South River Drive, Miami-Dade County, Florida 22.YEAR COMPLETED PROFESSIONAL SERVICES 2004 CONSTRUCTION (If applicable) 23.PROJECT OWNER’S INFORMATION a.PROJECT OWNERFDOT District 6 b.POINT OF CONTACT NAMEJorge Gomez c.POINT OF CONTACT TELEPHONE NUMBER305-470-5183 24.BRIEF DESCRIPTION OF PROJECT AND REVELANCE TO THIS CONTRACT (Include scope, size, and cost) The Florida Department of Transportation (FDOT) District VI has initiated this Project Development and Environment (PD&E) Study to identify transportation improvements for the Tamiami Canal Bridge on NW South River Drive/Delaware Parkway in order to meet existing and future pedestrian, vehicular, navigational and hydraulic conveyance needs. The project area is located on NW South River Drive between NW 19th Street and NW 32nd Avenue. Built in 1921, this existing movable swing bridge crosses over the Tamiami Canal (C-4) on NW South River Drive and is one of the oldest bridges on the Miami River System. The bridge’s age and unique engineering make it eligible for listing on the National Register of Historic Places. Any proposed improvement would require documentation to show that there is no prudent or feasible alternative. The bridge has deteriorated over the years and has suffered structural damage due to vehicular and vessel impacts. Structural deficiencies have resulted in weight restrictions of 30 tons, traffic and pedestrian safety concerns, and capacity concerns. The current bridge configuration has resulted in channel constriction and negative impacts to storm water management efforts. EAC is responsible for the roadway design, structures, corridor analysis, drainage, and PD&E study. To date, we have completed the data collection, the alternative corridor analysis and the roadway/bridge alternatives analysis portion of this study, along with the corresponding Public Involvement efforts including public meetings, meetings with public officials and agencies, alternatives public workshop and newsletters. F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20.EXAMPLE PROJECT KEY NUMBER (9) 21.TITLE AND LOCATION (City and State) Professional Services Agreement for Civil Engineering Services 22.YEAR COMPLETED PROFESSIONAL SERVICES 2016-Present CONSTRUCTION (If applicable) 23.PROJECT OWNER'S INFORMATION a.PROJECT OWNERVillage of Key Biscayne b.POINT OF CONTACT NAMEAna Varona c. POINT OF CONTACT TELEPHONENUMBER 305.365.7568 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) The Village of Key Biscayne (VKB) encompasses 850 acres and is characterized by terrain topography that is predominantly flat and low lying in relation to sea level. The elevations of the roadways are approximately 3.5 feet to nearly 6 feet above mean sea level (MSL). Due to its close proximity to Biscayne Bay and the Atlantic Ocean, the Village's stormwater management system is completely influenced by tidal waters, which presents a challenge for stormwater disposal systems. The fluctuating sea levels directly affect the boundary conditions of the stormwater drainage systems within the Village. EAC Consulting implemented a project approach methodology that proposed measures and systems that serve to protect the Village. The measures protect residents and businesses from property damage and quality of life disruptions that are associated with excessive flooding and prolonged staging of water. Projects: •Task 2 - Stormwater Improvement Implementation Plan •Emergency Pump Station Maintenance Evaluation for Ocean Lane Pump Station and East Heather Drive Pump Station •K-8 Sanitary Sewer System Relocation and Extension Design •401 Hampton Lane - Phase 1 Assessment •Beach Physical Monitoring Services •FDEP Local Government Funding Request Support Services •Year 7 NNS Biological Monitoring •Year 1 Post Construction Biological Monitoring •Phase V Village-wide Lighting Improvements •Beach Renourishiment •Toddler Park Lighting •Mashta Bridge Repair •Fernwood Lighting •Beach Renourishment Post Design Services •Kite Surfing Channel •Beach Renourishment - Biological Monitoring •Park Pavillions •Beach Management Feasibility and Technical Support Services •Basketball Courts Cover •No name Shoal Biological Monitoring •Buoy Design for Kite Surfing Channel 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME EAC Consulting, Inc. (2) FIRM LOCATION (City and State) Miami, FL (3) ROLE Prime b. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE f. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE STANDARD FORM 330 (REV. 8/2016) PAGE 3 F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20.EXAMPLE PROJECT KEY NUMBER (10) 21.TITLE AND LOCATION (City and State) Civil Engineering Services, Town of Medley, FL 22.YEAR COMPLETED PROFESSIONAL SERVICES 2011-2019 CONSTRUCTION (If applicable) 2013-2019 23.PROJECT OWNER'S INFORMATION a.PROJECT OWNER Town of Medley b.POINT OF CONTACT NAME Jorge Corzo, PE c.POINT OF CONTACT TELEPHONE NUMBER 305.887.9541 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) Since 2011, EAC Consulting, Inc has performed miscellaneous professional Civil Engineering Design Services to the Town of Medley. As part of these improvements our scope of services have included milling and resurfacing of the existing street, curb and gutter replacements, drainage and utility adjustments to improve service, brick pavers enhancements, concrete crosswalks, landscaping, streetscape enhancements, traffic signalization, bridge design, and pavement signings and markings. All our plans were designed and developed in full conformance with the Town of Medley Criteria, Miami- Dade County Public Works Department Standards and the Miami- Dade Department of Regulatory and Economic Resources (RER) criteria. Projects: 1.NW South River Drive Streetscape Masterplan 2.NW 96 Street Drainage and Streetscape Improvements 3.NW South River Drive Roadway and Drainage Improvements 4.NW South River Drive Watermain Improvements 5.NW 105 Way Bridge Improvements CEI Services 6.Danny Meehan Recreational Fields DCP 7.NW 116th Way Bridge Improvements 8.NW South River Drive Traffic Analyses and Planning 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME EAC Consulting, Inc. (2) FIRM LOCATION (City and State) Miami, FL (3) ROLE Prime Consultant b. (2) FIRM LOCATION (City and State)(3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE f. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE STANDARD FORM 330 (REV. 8/2016) PAGE 3 P-64 G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 26. NAMES OF KEY PERSONNEL (From Section E, Block 12) 27. ROLE IN THIS CONTRACT (From Section E, Block 13) 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in "Example Projects Key" section below before completing table. Place "X" under project key number for participation in same or similar role.) 1 2 3 4 5 6 7 8 9 10 Harold Desdunes, PE PRINCIPAL-IN-CHARGE K.T. Lin, PE, PhD PROJECT MANAGER X X X X X X X X Stephanie Romero, PE DEPUTY PROJECT MANAGER X X X X Enrique “Rick” Crooks, PE PLANNING X X X X X X X X Michael Adeife, PE CIVIL ENGINEERING DESIGN X X X Chun Li, PE QUALITY CONTROL-BRDIGES X X X Abid Hadrous, PE BRIDGES/STRUCTURES X X X X X Ning Wang, PE BRIDGES/STRUCTURES X X Hamid Anajafi , EI, PhD BRIDGES/STRUCTURES Dinesh Dagly, PE QUALITY CONTROL X X David Gilpin-Hudson, AICP PLANNING X Huntley Higgins, PE, PMP CIVIL ENGINEERING DESIGN X X Evelyn Rodriguez, PE, ENV SP CIVIL ENGINEERING DESIGN X X Miguel Lockward, PE, ENV SP CIVIL ENGINEERING DESIGN X X Satiar Shirazi, PE ROADWAY/MOT X Shan Patel, PE ROADWAY/MOT Cesar Quiroz, PE ROADWAY/MOT X Shahin Shaquil, PE DRAINAGE Herman Tirado, PE DRAINAGE Ramon Borges, PE LIGHTING Girish Thallapragada, PE LIGHTING Richard Lopez LIGHTING Jenner Alfaro, PE CONSTRUCTION ENGINEERING INSPECTIONS (CEI) Sergio Besu CONSTRUCTION ENGINEERING INSPECTIONS (CEI) Jeff LaBelle CONSTRUCTION ENGINEERING INSPECTIONS (CEI) STANDARD FORM 330 (REV. 3/2013) PAGE 4 29.EXAMPLE PROJECT KEY NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) 1 Hard Rock Stadium 6 Venetian Causeway Improvements 2 Snake Creek Pedestrian Bridge 7 Metro Zoo Aviary 3 NW 21st Street Avenue Pedestrian Bridge Over C-13 Canal 8 Tamiami Canal Historic Swing Bridge PD&E, NW South River Drive 4 Downtown Government Center Station (All Aboard Florida) 9 Professional Services Agreement for Civil Engineering Services 5 Meridian Avenue Over Collins Canal 10 Civil Engineering Services, Town of Medley H. ADDITIONAL INFORMATION PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED: I. AUTHORIZED REPRESENTATIVE (the foregoing is a statement of facts) 31. SIGNATURE OF AUTHORIZED REPRESENTATIVE:32. DATE SIGNED: 11/18/2020 33. NAME AND TITLE OF SIGNER: Harold Desdunes, PE STANDARD FORM 330 (REV. 3/2013) PAGE F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 1 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED Aventura Optima Aventura, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2011-2013 2013 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER Optima International Ariel Broomberg 305 677 9864 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (include scope, size, and cost) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE Savino & Miller Design Studio, PA 12345 NE 6th Avenue, North Miami, FL 33161 Landscape Architect b.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE c.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE d.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE A LEED Platinum project, was designed to integrate architecture and nature, providing native landscaped areas on three different levels as well as facade greening. The fifth level terrace consists of a large fountain with ‘floating’ wood deck providing a gathering space or seating area for passersby and employees alike. The roof garden provides a tranquil space for users to relax amongst the rolling landscape forms or exercise using the surrounding track. All materials utilized for this project come from recycled or reclaimed sources and the majority are produced by local manufacturers. Client: Optima International LLC Service: Master Planning, Schematic Design, Design Development, Construction Documents and Construction Administration for planting, paving, irrigation, fountains and green roof Architect: Behar Font & Partners Awards: 2015 FL ASLA Award of Merit, 2015 Green Roofs for HealthyCities Award of Excellence, 2014 Most Outstanding LEED CS Project by the South Florida Chapter of the U.S. Green Building Council F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 2 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED Museum Park Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2010-2013 2014-2019 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT EMAIL ADDRESS City of Miami John De Pazos jdepazos@miamigov.com 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (include scope, size, and cost) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE Savino & Miller Design Studio, PA 12345 NE 6th Avenue, North Miami, FL 33161 Landscape Architect b.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE c.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE Museum Park is located on the site of the former “Bicentennial Park” that essentially isolated a portion of the Downtown Miami urban fabric from its waterfront. Approximately twenty acres in size, the park sits at the terminus of Government Cut, the City’s waterway axis from the Atlantic Ocean. This open space is one of the rare opportunities to public access the waterfront in Miami. The park, conceived together with the proposed Perez Art Miami Museum (completed) and the Phillip and Patricia Frost Science Museum (in construction), has become popular for residents and tourists alike, serving the booming urban district adjacent to the park space, and museum visitors. Museum Park Phase I is part of the original Master Plan concept, at a price of $45 million. In 2010, the recession forced the City to temporarily abandon the project. In 2011-12, as the recession came to a close, the City decided to begin a scaled- down version of the original park as a first step towards eventually realizing the original Park’s design intent. Savino & Miller was hired to implement this phase for $10 Million (Baywalk, Entrance, Open Green, Museum Plaza). Cost: $10 Million Size: 19 Acres Services: Landscape Architecture: Master Plan, Paving/Site furniture consultation, Planting & Irrigation Improvements, and Construction Phase Services. Award: 2015 FL ASLA Award of Merit F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 3 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED South Pointe Park Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2005-2009 2010 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT EMAIL ADDRESS City of Miami Beach John Oldenburg, Former Assistant Director, City of Miami Beach joldenburg@balharbourfl.gov 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (include scope, size, and cost) South Pointe Park is designed as a dramatic, ecologically sensitive park at the south end of Miami Beach. The design is programmed to accommodate both active and passive recreation, with play fields, dune and hammock zones, a playground, and a 20 ft. wide baywalk. An important goal in the Master Plan process was to integrate the park into the urban fabric of the city by strengthening and improving the two major street axes which penetrate the park space. SMDS provided consultation for Master Site Planning, paving materials and site furniture selection, and was the primary landscape architect for the park’s planting and irrigation improvements. The fast-track design process began with Master Planning in April 2005. Project was completed in May 2010. Services: Local Landscape Architect: Master Plan, Planting & Irrigation Improvements, and Construction Phase Services Prime: Hargreaves Associates Size: Approx. 22 Acres Project Cost: $20,000,000 Award: 2010 FNGA Award of Excellence 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE Savino & Miller Design Studio, PA 12345 NE 6th Avenue, North Miami, FL 33161 Local Landscape Architect b.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE c.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 4 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED Belle Isle Streetscape & Park Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2007-2010 2008-2010 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT EMAIL ADDRESS City of Miami Beach Carla Dixon, Project Manager carladixon@miamibeachfl.gov 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (include scope, size, and cost) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE Savino & Miller Design Studio, PA 12345 NE 6th Avenue, North Miami, FL 33161 Landscape Architect b.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE c.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE Belle Isle Park, located on the only natural island of the Venetian Islands between Miami and Miami Beach, is a major open space surrounded on three sides by high-density condominium buildings, and Venetian Causeway to the north. The space offered no walkways or large open spaces for play, but was mostly used by residents to walk the dogs. SMDS was asked to create a plan to attract more residents to use the park, and responded with a plan which provided for a range of recreational opportunities. A large elliptical open space formed by a walkway, coupled with a “Bark Park” and numerous small paved seating areas – located by each of the park entry/street crosswalks – allows for both passive and active play activities. Numerous existing trees and palms were preserved or transplanted to create and define the park’s spaces. In addition to the park, SMDS was hired for the Venetian Islands GOB project: a mid-Miami Beach neighborhood general obligation bond project for streetscape, water main and drainage improvements, which included Belle Isle’s streetscape. SMDS’ role was to master plan and prepare street designs for the revised street layout/reconfiguration and signage. The master plan’s major thrust was to call for narrowing streets to facilitate three goals: 1) traffic calming; 2) improve drainage; and 3) increase green space. A number of meetings resulted in creating consensus to target various improvements, i.e. planting, lighting, and sidewalk installation/repair. Size: 6 Acre Park + Streetscape Principal Firm: Jacobs & Associates Scope: Schematic through Construction Phase Services Project Cost: $450,000 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 5 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED Sunny Isles Gateway Park Sunny Isles, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2012-2013 2017 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT EMAIL ADDRESS City of Sunny Isles Joseph Milton josephmilton@j-milton.com 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (include scope, size, and cost) Sunny Isles Beach Park/Garage is a park designed as a new community green space, ideally located at one of the major gateways to the City. Established as a joint venture between developer (who has significant condominium holdings adjacent to the park) and the City, the park provides diverse recreational activities and allows for programming large community events like concerts, games, etc. A small courtyard is located adjacent to a planned cafe, along with a waterfall, water play area and playground. Location: Sunny Isles Beach, FL Service: Master Plan thru Construction Administration Principal Firm: Axioma3 Architects Date:Ongoing Project Cost: $2 Million Principal in-charge: Barry Miller 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE Savino & Miller Design Studio, PA 12345 NE 6th Avenue, North Miami, FL 33161 Local Landscape Architect b.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE c.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE SITE PLAN FINAL CONCEPT 01-19-2012 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 6 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED Sunny Isles City Hall Sunny Isles, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2002-2004 2004 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT EMAIL ADDRESS City of Sunny Isles Lawrence Kline (Perkins & Will)lawrence.kline@perkinswill.com 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (include scope, size, and cost) In close collaboration with the City and design team, a Master Plan was created to link street, building, and open space. Our open space concept integrates City Hall and adjacent restaurant into a cohesive urban setting. Users are engaged through sensitive placement of indoor- outdoor elements/activities. SMDS was responsible for all open space improvements, including Fountain/Plaza, site lighting, planting and paving. Native/xeriscape planting and local paving materials were selected for their sustainability and ease of maintenance. Location: Sunny Isles Beach, Florida Client: Spillis Candela / City of Sunny Isles Beach Project Cost: $300,000 Service: Master Planning, Schematic Design – Construction Administration Architect: Spillis Candela & Partners (Currently Aecom) Date Construction: 2004 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE Savino & Miller Design Studio, PA 12345 NE 6th Avenue, North Miami, FL 33161 Landscape Architect b.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE c.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 7 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED 41st Street Bridge Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2003-2005 2005 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT EMAIL ADDRESS City of Miami Beach Ira Giller (Owner’s Rep)ira@gillerandgiller.com 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (include scope, size, and cost) The design concept is based on the importance of 41st Street as a diverse community center and major gateway into the heart of Miami Beach. The goal was to transform the street into a tropical cosmopolitan “boulevard,” based on 41st Street’s unique geographic location and particular functions. The design called for a sequence of spatial experiences, or “events,” which were linked together by Royal Palms, flowering shrubs, and groundcovers. A landscape median was proposed for the length of the street, with new decorative paving for all sidewalks. A major element of the plan was the redesign of the Indian Creek Bridge, calling for wider sidewalks, benches, planters, and a pavilion lighthouse, acting as a gateway to the street. Location: Miami Beach, FL Service: Master Plan, Schematic Plans, Design Development, Construction Administration Principal Firm: Consul-Tech Engineering Date:2005 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE Savino & Miller Design Studio, PA 12345 NE 6th Avenue, North Miami, FL 33161 Landscape Architect b.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE c.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 8 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED River Landing Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2012-present In Progress 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT EMAIL ADDRESS River Landing, LLC Andrew Hellinger andy@urbanxco.com 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (include scope, size, and cost) Lying on the north bank of the Miami River, the River Landing project is a large mixed-use project with big box retail, neighborhood ground level stores, and condominiums in two high-rise towers. The landscape design concept is to create a linear riverside park, which meanders along the river through a landscape of native trees and palms, raised seating and café terraces, all oriented to focus on the river itself. Still a working river, the landscape materials will reflect the maritime/industrial vocabulary of the bridges, ships and shipyards along its banks. A large amphitheater is designed on the east side of the project as a neighborhood park and performance venue. Client: River Landing LLC Service: Master Plan, Schematics - Construction Docs / Construction Administration. Project Cost: $3.5 Million Architect: ADD Inc. Architects Date: In progress 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE Savino & Miller Design Studio, PA 12345 NE 6th Avenue, North Miami, FL 33161 Landscape Architect b.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE c.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 9 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED Miami Baywalk & Riverwalk Design Guidelines Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2017-2019 N/A 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT EMAIL ADDRESS Miami Downtown Development Authority Patrice Gillespie-Smith pgsmith@miamidda.com 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (include scope, size, and cost) The Miami Baywalk Design Guidelines propose lighting, paving, planting, furnishing and shoreline improvements along Biscayne Bay and the Miami River within the Miami DDA boundaries. Focusing on Miami’s resiliency, history, culture, identity and ecology, the guidelines dictate design standards to improve existing conditions on the Baywalk and Riverwalk, providing flexibility and cohesion while staying true to the character of the site and the needs and desires of the community. Location: Miami, Florida Client: Miami Downtown Development Authority Service: Master Plan, Design Guidelines Principal Firm: Savino & Miller Design Studio Date: In Progress 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE Savino & Miller Design Studio, PA 12345 NE 6th Avenue, North Miami, FL 33161 Landscape Architect b.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE c.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 10 21. TITLE AND LOCATION (City and State)22. YEAR COMPLETED Tamiami Canal Tender House Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (if applicable) 2010-2013 2018-2019 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER b. POINT OF CONTACT NAME c. POINT OF CONTACT EMAIL ADDRESS Miami-Dade County Dennis Fernandez Dennis.Fernandez@miamidade.gov 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (include scope, size, and cost) The Tamiami Canal Tender House design proposes an iconic building and new bridge aesthetic that marks a gateway to the Tamiami Canal from the Miami River and a landmark for the neighborhood. This new element helps the urban articulation of the North and South sides of the Tamiami Canal. Based on the analysis of the existing conditions and engineering study, the recommendation to replace the bridge and control house necessitated a careful analysis and study of various alternatives to locate the control house according to two primary criteria: maximizing views from the control house of boat traffic, and maintaining views over vehicular and pedestrian traffic. As a result, the control house was proposed at the north-east side of the proposed new bridge. The control room provides a 180 degree view and includes two additional windows towards the rear for pedestrian traffic control on the sidewalks. The control room cantilevers over the bank at the Tamiami Canal to maximize the visual access to all boat and vehicular traffic. The location of the bridge and its relationship with the surrounding residential and warehouse neighborhoods along the Tamiami Canal, as well as the Canal itself, defines the urban context and vocabulary which inspired the aesthetic design response for the new bridge, control house and streetscape. Boats, ship smokestacks, cranes, containers, metal grates and trusses, create the visual context and identity of this area, connecting the residential community to the working warehouse neighborhood and Tamiami Canal. Portholes windows and eyebrows are also integral to the structure; to reflect the visual vocabulary of the surrounding boats. The control house, sheathed with metal skin, is designed to look as a contain- er “hanging” from a crane. The new bridge pedestrian railing recalls the existing truss system of the historic bridge, designed in a contemporary fashion with steel cables and rods. 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE Savino & Miller Design Studio, PA 12345 NE 6th Avenue, North Miami, FL 33161 Landscape Architect b.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE c.(1) FIRM NAME (2) TITLE AND LOCATION (City and State)(3) ROLE G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 26. NAMES OF KEY PERSONNEL (From Section E, Block 12) 27. ROLE IN THIS CONTRACT (From Section E, Block 13) 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in “Example Projects Key” section below before completing table. Place “X” under project key number for participation in same or similar role.) 1 2 3 4 5 6 7 8 9 10 Barry Miller Principal-in-Charge X X X X X X X X X Adriana Savino Master Planning X X X X X X X X X 29. EXAMPLE PROJECTS KEY NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) NO. TITLE OF EXAMPLE PROJECT (FROM SECTION F) 1 Aventura Optima 6 Sunny Isles City Hall 2 Museum Park 7 41st Street Bridge 3 South Pointe Park 8 River Landing 4 Belle Isle Streetscape & Park 9 Miami Baywalk & Riverwalk Design Guidelines 5 Sunny Isles Gateway Park 10 Tamiami Canal Tender House Kelly Hitzing Landscape Architect H. ADDITIONAL INFORMATION 30. PROVIDE ANY ADDITIONAL INFORMATION REQUESTED BY THE AGENCY. ATTACH ADDITIONAL SHEETS AS NEEDED. I. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts 31. SIGNATURE 32. DATE 11/08/2020 33. NAME AND TITLE Adriana Savino-Miller, President F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (CityandState) 20. EXAMPLE PROJECT KEY NUMBER 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 23.PROJECT OWNER'S INFORMATION a. PROJECT OWN ER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. STANDARD FORM 330 (REV. 8/2016) PAGE 3 Roosendaal Pedestrian Bridge, Roosendaal, The Netherlands 2012 - 2014 1 Van Hattum en Blankevoort Scope - Bridge design Size - length, 188m; Height, 8m. Cost - €3.15 million ($4.9 million USD) The design for the footbridge across railway tracks in Roosendaal was a challenging task that aimed to optimize the viability and functionality of a large area surrounding the railway station. The footbridge strengthens the relationship between the various urban precincts alongside the tracks and establishes new dialogue between the existing public spaces. The bridge design is based on structural, functional and visual amenity determinants and a search for a strong character created by means of a simple construction. The proposed bridge provides an answer to this overall context by a balanced combination and integration of shape, structure and construction materials. Connection Focusing on Urban Settlement: The rail hub is located at the junction of a number of different residential areas; however the station previously functioned like a barrier in the urban fabric. The location of the new bridge and, the position of the pre-cast concrete stairs, extend the natural connections to and from the site and emphasizes the bridge’s ‘entry’ points. So it joins the ‘new city banks’ with city, park and station and thus improves the overall image of the entire station area. Either end of the new footbridge are decorated with a three-dimensional tree pattern, designed by a local artist and realized in steel. The station environment demanded robust but elegant detailing, in keeping with the overall form .The bridge is designed to be low maintenance and weather and dirt resistant. The glass parapet satisfies the technical requirements and fulfills West 8’s our desire for maximum transparency. The rampart is independent of the main structure and supported by regularly spaced balusters. The position, as well as the difference in the module size with respect to the main structure gives the side of the bridge “depth”. West 8 Rotterdam, The Netherlands Architectural desin Volker Staal en Funderingen Krabbepolder, Dordrecht, The Netherlands Realization Jens de Vries +31 10 2992288 2014 The design for the footbridge across railway tracks in Roosendaal, was a challenging task that aimed to optimise the viability and functionality of a large area surrounding the railway station. The footbridge strengthens the relationship between the various urban precincts alongside the tracks and establishes new dialogue between the existing public spaces. The bridge design is based on structural, functional and visual amenity determinants and a search for a strong character created by means of a simple construction. The proposed bridge provides an answer to this overall context by a balanced combination and integration of shape, structure and construction materials. The rail hub is located at the junction of a number of different residential areas; however the station previously functioned like a barrier in the urban fabric. The location of the new bridge and, the position of the precast concrete stairs, extend the natural connections to and from the site and emphasizes the bridge’s ‘entry’ points. So it joins the ‘new city banks’ with city, park and station and thus improves the overall image of the entire station area. Either end of the new footbridge are decorated with a three-dimensional tree pattern, designed by a local artis and realised in steel. The station environment demanded robust but elegant detailing, in keeping with the overall form .The bridge is designed to be low maintenance and weather and dirt resistant. The glass parapet satisfies the technical requirements and fulfils West 8’s our desire for maximum transparency. The rampart is independent of the main structure and supported by regularly spaced balusters. The position, as well as the difference in the module size with respect to the main structure gives the side of the bridge “depth”. Bridge assembly on-site Relationship to the surrounding context Client: Van Hattum en Blankevoort Design - Realisation: 2012 - 2014 Length: 188m Height: 8m Function: Pedestrian & Bicycle Bridge Value: €3.15 million ($SD 4.9 million) Consultants Volker Staal en Funderingen (responsible for realization ROOSENDAAL, THE NETHERLANDS ROOSENDAAL PEDESTRIAN BRIDGE 'HET WRAKHOUT' Wenduine Pedestrian bridge, Wenduine, Belgium 2004 -2014 Scope - Bridge design Size - Length 83m; Width - 4.4m. Cost - €3.2 million ($3.8 million USD) Team - West 8 + BAS + Snoeck & Partners In 2004, a competition was held for a pedestrian and bicycle bridge that would offer a solution to a site characterized by intensive human traffic. (Holidaymakers and their children had to cross four lanes of busy residential traffic and a double tram track in order to get to the beach.) The brief called for a design "of high architectural and formal quality that gave particular attention to the sensitive integration of the structure in the natural environment." West 8's design, which was deemed the best of the five plans submitted, harnesses the natural context, celebrates the site’s historical significance and takes into consideration the existing spatial structure of the nearby 'Uitkerkse Polder. Opened in 2014, the new bridge fits into the coastal cycle route, providing stops for cyclists, information points, bicycle parking, and a secure connection between coastal villages. The bridge is also connects to the Coastal Footpath and a provides a wonderful opportunity for people to experience the natural landscape. The irregular structure of the bridge is inspired by driftwood. Indeed the completed structure is an assembly of azobé wood, concrete and steel that exhibits the chaos of the beachcomber’s work. While bridges are usually made of concrete and steel, wood was chosen as a beautiful and durable construction material that was not only functional but also the perfect complement to the marine context. A new dune volume provides a natural access ramp and the required clearance of the road profile. The bridge, which is 83m long and 4,40m wide is constructed from two wooden trusses, which are functional and load bearing, supported on concrete brackets. The irregularity of the bridge is formed by the six, 13m wide concrete yokes, which are staggered on either side of the bridge. The highest gantry is 8m; the largest span 14m. The hefty appearance of the pillars, reference the bunkers of the Atlantic Wall which once ran along stretches of the Belgian coast. A series of wooden braces above the bridge deck absorb the horizontal lateral forces but also add a protective feel, offering using users a sense of security as they look into the open horizon. The structure reconciles numerous elements of the coastal landscape with one another; security, mobility, nature, seawalls, passive recreation, culture and the landscape experience. Synthesizing all these elements 'Het Wrakhout' is a beautiful example of an integrated and sustainable coastal development. Vlaams Gewest, afdeling Waterwegen - Kust 2014 Architecture and engineeringKortrijk, Belgium West 8 Rotterdam, The Netherlads Foot-Bridge Design after competition, construction refinement coordination between associated consultants, Supervision of construction, surrounding public space landscape design, maintenance plan development Leuven, Belgium Sammy Ferret +32(0)59554285 Snoeck & Partners (Now Sweco Belgium) BAS Structural engineering 2 In 2004, a competition was held for a pedestrian and bicycle bridge that would offer a solution to a site characterized by intensive human traffic. (Holidaymakers and their children had to cross four lanes of busy residential traffic and a double tram track in order to get to the beach.) The brief called for a design "of high architectural and formal quality that gave particular attention to the sensitive integration of the structure in the natural environment." West 8's design, which was deemed the best of the five plans submitted, harnesses the natural context, celebrates the site’s historical significance and takes into consideration the existing spatial structure of the nearby 'Uitkerkse Polder. Opened in 2014, the newbridge fits into the coastal cycle route, providing stops for cyclists, information points, bicycle parking, and a secure connection between coastal villages. The bridge is also connects to the Coastal Footpath and a provides a wonderful opportunity for people to experience the natural landscape. The irregular structure of the bridge is inspired by driftwood. Indeed the completed structure is an assembly of azobé wood, concrete and steel that exhibits the chaos of the beachcomber’s work. While bridges are usually made of concrete and steel, wood was chosen as a beautiful and durable construction material that was not only functional but also the perfect complement to the marine context. A new dune volume provides a natural access ramp and the required clearance of the road profile. The bridge, which is 83m long and 4,40m wide is constructed from two wooden trusses, which are functional and load bearing, supported on concrete brackets. The irregularity of the bridge is formed by the six, 13m wide concrete yokes, which are staggered on either side of the bridge. The highest gantry is 8m; the largest span 14m. The hefty appearance of the pillars, reference the bunkers of the Atlantic Wall which once ran along stretches of the Belgian coast. A series of wooden braces above the bridge deck absorb the horizontal lateral forces but also add a protective feel, offering using users a sense of security as they look into the open horizon. The structure reconciles numerous elements of the coastal landscape with one another; security, mobility, nature, seawalls, passive recreation, culture and the landscape experience. Synthesising all these elements 'Het Wrakhout' is a beautiful example of an integrated and sustainable coastal development. 'HET WRAKHOUT' WENDUINE PEDESTRIAN BRIDGE Client: Vlaams Gewest, afdeling Waterwegen - Kust Competition 2005 Design & realisation 2009-2014 Length 83 m Width: 4.4m Value: €3.2 million Function: Pedestrian bridge Team: West 8 + BAS + Snoeck & Partners WENDUINE, BELGIUM The site prior to development F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (CityandState) 20. EXAMPLE PROJECT KEY NUMBER 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 23.PROJECT OWNER'S INFORMATION a. PROJECT OWN ER b. POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE a. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE C. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE e. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE f. STANDARD FORM 330 (REV. 8/2016) PAGE 3 Bridge over Wilheminakanaal, Oirschot, The Netherlands 2012 - 2016, 2020 2020 Gemeente Oirschot Piet Machielsen +31 (0) 499 58 33 33 Scope - Bridge design Size - Length 40m; Width - 5.6m. Cost - €3.2 million ($3.8 million USD) Team - West 8 + wUrck The slow traffic bridge in Oirschot, a historical town in the south of The Netherlands, was opened in 2020. Conceived by West 8, the elegant and simple truss is ground-breaking in its use of wood as a primary material to span the 40 meter clearing across the Wilhelmina Canal. The ramps with their bright red steel railings offer comfortable access for pedestrians and cyclists and create alternating views over the canal, culminating in a beautiful sight-line towards Oirschot’s historical St Peters Church. Connecting visitors directly to the town square and matching the character of the surrounding woodland, the bridge is transparent, compact in form, and uses Azobé wood to traverse the canal. The bridge is a pinnacle landmark for the Green Corridor, a 13 km long recreational route through a National Landscape which links the city of Eindhoven with the historical center of Oirschot. West 8 Rotterdam, The Netherlands Architecture, Landscape and Bridge design wUrck Design development RoyalHaskoningDHV Construction advisor Rotterdam, The Netherlands Amersfoort, The Netherlands 3 1 OIRSCHOT, THE NETHERLANDS BRIDGE OVER WILHELMINAKANAAL Client: Gemeente Oirschot Design: 2012-2016 Completed: 2020 Design team: Architect + Landscape Architect: West 8 Uitvoerend architect: wURck architectuur stedenbouw landschap Construction advisor: RoyalHaskoningDHV Contractor Team: Ballast Nedam Houthandel Wijma Kampen Staalbouw Nauta Heeg Ingenieursbureau Wage- maker Lekstroom Transport The slow traffic bridge in Oirschot, a historical town in the south of The Netherlands, was opened in 2020. Conceived by West 8, the elegant and simple truss is ground-breaking in its use of wood as a primary material to span the 40 meter clearing accross the Wilhelmina Canal. The ramps with their bright red steel railings offer comfortable access for pedestrians and cyclists and create alternating views over the canal, culminating in a beautiful sightline towards Oirschot’s historical St Peters Church. Connecting visitors directly to the town square and matching the character of the surrounding woodland, the bridge is transparent, compact in form, and uses Azobé wood to traverse the canal. The bridge is a pinnacle landmark for the Green Corridor, a 13 km long recreational route through a National Landscape which links the city of Eindhoven with the historical centre of Oirschot. The Green Corridor: The Green Corridor will become the recreational bicycle connection between the center of Eindhoven, Oirschot and Het Groene Woud. In 2012 the integrated vision of Green Corridor through West 8 was presented to the Municipality of Eindhoven. It is a route of 13 kilometers in total. The municipality of Oirschot, the municipality of Eindhoven and Brabants Landschap have the plan to realize the Green Corridor to connect the Market in Oirschot and the center of Eindhoven. This will make a beautiful and friendlier route for cyclists and pedestrians, turning the Oirschotsedijk car-free and, in total, around 9,000 trees are to be planted with the creation of a flowery grassland on both sides of the Green Corrdior. 2 1 AMSTERDAM, THE NETHERLANDS BORNEO-SPORENBURG BRIDGES Client: Projekt Management Buro Amsterdam Design: 1998-1999 Construction: 2000 Span: Sister bridges - 93m Footbridge - 25m The three bridges of Borneo/Sporenburg by West 8 play an essential role at the creation of the unique atmosphere in the harbour-residential area. Two of the bridges, one on the West side and the other on the East side, span the 93-meter wide water of the Railroad basin and connect the islands of Borneo and Sporenburg. The third bridge is situated in the line of the East bridge and spans the 25-meter wide inland port. Two peninsulas in the eastern part of the Amsterdam docks, were to be exploited for water- related activities, as well as 2500 low-rise dwelling units, with a density of 100 units per hectare. For a new interpretation of the traditional Dutch canal house, West 8 suggested new types of three- storey, ground-accessed houses deviating from the usual terraced house in being strongly oriented to the private realm by incorporating patios and roof gardens. By repeating this type in a great variety of dwelling modes and with maximum architectural variation, an animated street elevation emerges with a focus on the individual. At a larger scale, a delicately balanced relationship exists between the repetition of the individual dwellings, the roofscape and the great scale of the docks. Three immense sculptural blocks take their place as landmarks in the vast expanse of houses. 2 G.KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 26.NAMES OF KEY 27.ROLE IN THIS 28.EXAMPLE PROJECTS LI STED IN SECTION F PERSONNEL CONTRACT (Fill in "Example Projects Key" section be low before completing table. (From Section E, Block 12) (From Section E, Block 13) Place "X" under project key number for participation in same or similar role.) 1 2 3 4 5 6 7 8 9 10 29.EXAMPLE PROJECTS KEY NUMBER TITLE OF EXAMPLE PROJECT (From Section Fi NUMBER TITLE OF EXAMPLE PROJECT (From Section F) 1 6 2 7 3 8 4 9 5 10 STANDARD FORM 330 (REV 812016) PAGE 4 Adriaan Geuze Founder, Director X X X Daniel Vasini Creative Director, X X Architect / Urban Designer Ashley Schwemmer Project Manager, Landscape Architect Roosendaal Pedestrian Bridge, Roosendaal, The Netherlands 'HET WRAKHOUT' Wenduine Pedestrian bridge, Wenduine, Belgium Bridge over Wilheminakanaal, Oirschot, The Netherlands PART II - GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (or Branch Office) NAME EAC Consulting, Inc. 3. YEAR ESTABLISHED 4. UNIQUE ENTITY IDENTIFIER 2b. STREET 5959 Blue Lagoon Drive, Suite 410 5. OWNERSHIP a. TYPE 2c. CITY Miami 2d. STATE FL 2e. ZIP CODE 33126 b. SMALL BUSINESS STATUS 6a. POINT OF CONTACT NAME AND TITLE Harold Desdunes PE., Senior Vice President 7. NAME OF FIRM (If Block 2a is a Branch Office) 9292 6c. E-MAIL ADDRESS 8a. FORMER FIRM NAME(S) (If any) 8b. YEAR ESTABLISHED 8c. UNIQUE ENTITY IDENTIFIER 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function Code b. Discipline c. Number of Employees a. Profile Code b. Experience c. Revenue Index Number (see below) (1) FIRM (2) BRANCH 02 Administrative 29 21 A06 Airports, Terminals 1 08 CADD Operators 3 2 B02 Bridges 6 12 Civil Engineers 17 9 C15 Construction Management 7 15 Construction Inspectors 14 12 D04 Design-Build 3 57 Structural Engineers 9 5 H07 Highway 6 60 Transportation Engineers 15 13 I06 Intelligent Transportation Systems 5 21 Electrical Engineer 0 0 P06 Planning, Site 5 16 Construction Manager 2 1 W02 Water Resources 2 53 Scheduler 1 1 W03 Water Supply, Treatment and Distrib 6 47 Planner Urban/Regional 0 0 Other Employees Total 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) PROFESSIONAL SERVICES REVENUE INDEX NUMBER 1. Less than $100,000 6. $2 million to less than $5 million 2. $100,000 to less than $250,000 7. $5 million to less than $10 million 3. $250,000 to less than $500,000 8. $10 million to less than $25 million 4. $500,000 to less than $1 million 9. $25 million to less than $50 million 5. $1 million to less than $2 million 10. $50 million or greater a. Federal Work 4 b. Non-Federal Work 8 c. Total Work 8 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. c. NAME AND TITLE STANDARD FORM 330 (REV. 8/2016) PAGE 6 1. SOLICITATION NUMBER (If any) ARCHITECT-ENGINEER QUALIFICATIONS a. SIGNATURE b. DATE 20-10-01 1994 Corporation No 305-265-5400 hdesdunes@eacconsult.co 11/16/2020 Harold Desdunes PE., Senior Vice President PART II - GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) a. SIGNATURE ARCHITECT-ENGINEER QUALIFICATIONS 2a. FIRM (or Branch Office) NAME 2b. STREET 2c. CITY 2d. STATE 2e. ZIP CODE 3. YEAR ESTABLISHED 4. UNIQUE ENTITY IDENTIFIER 5. OWNERSHIP b. Discipline c. Number of Employees 10. PROFILE OF FIRM'S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS b. Experience c. Revenue Index Number (see below) STANDARD FORM 330 (REV. 8/2016) PAGE 6 1. SOLICITATION NUMBER (If any) 8a. FORMER FIRM NAME(S) (If any)8b. YEAR ESTABLISHED 9. EMPLOYEES BY DISCIPLINE Total (1) FIRM (2) BRANCH 1. Less than $100,000 2. $100,000 to less than $250,000 3. $250,000 to less than $500,000 4. $500,000 to less than $1 million 5. $1 million to less than $2 million 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) 7. NAME OF FIRM (If Block 2a is a Branch Office) 6a. POINT OF CONTACT NAME AND TITLE 6c. E-MAIL ADDRESS 8c. UNIQUE ENTITY IDENTIFIER a. Federal Work b. Non-Federal Work c. Total Work 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. b. DATE c. NAME AND TITLE a. Function Code a. Profile Code 6b. TELEPHONE NUMBER a. TYPE b. SMALL BUSINESS STATUS PROFESSIONAL SERVICES REVENUE INDEX NUMBER 6. $2 million to less than $5 million 7. $5 million to less than $10 million 8. $10 million to less than $25 million 9. $25 million to less than $50 million 10. $50 million or greater Other Employees 20-10-01 6&RUS 6%( 6DYLQR 0LOOHU'HVLJQ6WXGLR 1(WK$YH6XLWH$ 1RUWK0LDPL $GULDQD6DYLQR3UHVLGHQW / 3 / 3 5 6 $UFKLWHFW8UEDQ'HVLJQHU /DQGVFDSH$UFKLWHFWXUH 3ODQQLQJ 8UEDQ5HQHZDOV /LJKWLQJ 3XEOLF)DFLOLWLHV 5HFUHDWLRQDO)DFLOLWLHV 6XVWDLQDEOH'HVLJQ /DQGVFDSH$UFKLWHFW /DQGVFDSH$UFK'HVLJQHUV &OHULFDO $GULDQD#VDYLQRPLOOHUFRP )/ $GULDQD6DYLQR3UHVLGHQW 20-10-01 11/19/20 11/18/20 11/19/20 20-10-01 11/19/20 20-10-01 11/19/20 20-10-01 11/19/20 20-10-01 11/19/20 20-10-01 11/19/20 20-10-01 11/18/20 20-10-01 F. FIRM REFERENCES AND SIMILAR WORK COMPLETED FIRM REFERENCES AND SIMILAR WORK COMPLETEDf RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA f FIRM REFERENCES AND SIMILAR WORK COMPLETED EAC Consulting, Inc. A. Client Name, Address, Contact, Phone and Fax Numbers and valid e-mail address; B. Project Title C. Description of work performed, including the project location D. Year completed E. Past 5 years copies of executed agreements made between your firm and local municipalities, with a scope similar to this RFQ. City of Miami Gardens Les Pettit, Public Work, City Engineer 305-622-8000 Ext. 2570 lpettit@miamigardens-fl.gov Hard Rock Pedestrian Bridge Design of two pedestrian bridges at Hard Rock Stadium 2020 N/A FDOT District 6 Raul Quintela, Project Manager 305-470-5271 Raul.Quintela@dot.state.fl.us Golden Glades Multimodal Transportation Facility (GGMTF) D/B Project Design of one pedestrian bridge at Golden Glades Multimodal Transportation Facility 2020 N/A FDOT District 5 Leonel Cortés, P.E. 719 S. Woodland Blvd., MS 2-542 DeLand, FL 32720 (386) 943-5408 Leonel.cortes@dot.state.fl.us SR 5/US1 from South St. to Magnolia ShangriLa Dr. Design of two pedestrian bridges at SR 5/US1 2017 N/A EAC Consulting, Inc. eacconsult.com F F-1 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA f Savino & Miller Design Studio A. Client Name, Address, Contact, Phone and Fax Numbers and valid e-mail address; B. Project Title C. Description of work performed, including the project location D. Year completed E. Past 5 years copies of executed agreements made between your firm and local municipalities, with a scope similar to this RFQ. John De Pazos, Sr. Project Manager, City of Miami Capital Improvement Program Miami Riverside Center 444 S.W. 2nd Avenue, 8th Fl Miami, FL 33130 305-416-1094 305-416-2153 fax jdepazos@miamigov.com Maurice A Ferre Park, Miami, FL Landscape architectural and master planning services for 20- acre waterfront park 2018 N/A David Martinez, Director City of Miami Beach Office of Capital Improvements 1700 Convention Center Drive Miami Beach, FL 305-673-7071 786-394-4103 fax DavidMartinez@miamibeachfl.gov PAR 3 Park, Miami Beach, FL Landscape architectural and master planning services for 20- acre neighborhood park In progress (90% CD)N/A Neal Schafers, Miami Downtown Development Authority Planning, Urban Design & Transportation 200 S Biscayne Blvd, Miami, FL 305-379-6566 305-371-2423 fax schafers@miamidda.com Miami Baywalk & Riverwalk Design Guidelines, Miami, FL Landscape architecture, urban design and master planning services for 5-mile waterfront promenade 2019 N/A F-2 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA f West 8 A. Client Name, Address, Contact, Phone and Fax Numbers and valid e-mail address; B. Project Title C. Description of work performed, including the project location D. Year completed E. Past 5 years copies of executed agreements made between your firm and local municipalities, with a scope similar to this RFQ. Sammy Ferret Project Engineer Vlaams Gewest, Maritieme Dienstverlening en Kust (MDK) Koning Albert II-laan 20 box 5 1000 BRUSSELS Tel .: 02 553 77 27 Fax: 02 553 77 05 sammy.ferret@mow.vlaanderen.be Wenduine Bridge, The Netherlands Landscape architecture and bridge concept design for Wenduine bridge and surrounding public landscapes. 2014 N/A Jens de Vries Project ManagerVolker Steel and Foundations Donker Duyvisweg 75, 3316 BL Dordrecht, NL +31 78 654 62 00 info@vsf.nl Passerelle Station Roosendaal, The Netherlands Landscape architecture and bridge concept design for footbridge design and surrounding public landscapes. 2014 N/A Howard Herring Director New World Symphony 500 17th Street Miami Beach, FL 33139 (305) 680-5866 Phone (855) 982-9998 (305) 673-6749 Fax Howard.herring@nws.edu Soundscape Park, Miami Beach, FL Landscape Architecture and master planning services for a 3 acre park 2011 N/A Maria Hernandez Project Manager City of Miami Beach 1700 Convention Center Drive, 4th Floor, Miami Beach, FL 33139 Direct: 305-673-7000 Ext. 2584 / Main: 305-673-7010 / Fax: 305-673-7782 / mariahernandez@miamibeachfl.gov Miami Beach Convention Center, Miami Beach, FL Landscape Architecture and master planning services for a 5 acre park, and 4 acres of streetscape and public realm 2020 N/A F-3 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA f ASA Consultants, Inc. A. Client Name, Address, Contact, Phone and Fax Numbers and valid e-mail address; B. Project Title C. Description of work performed, including the project location D. Year completed E. Past 5 years copies of executed agreements made between your firm and local municipalities, with a scope similar to this RFQ. Astaldi Construction FDOT District 4 Jeffrey Robbert, PE (954) 777-4648 Jeffrey.robbert@dot.state.fl.us 3400 W Commercial Boulevard Fort Lauderdale, Florida 33309 SR 9/I-95 Spanish River Interchange All facets of Professional Engineering Design including Schnabel wall Design, Permitting, and Post Design Services for the addition of a new interchange on I-95 between the Glades Road and Yamato Road Interchanges in Palm Beach County, Florida. 2017 N/A BCC Engineering, Inc. Bob Forand, PE (954) 928-1828 Bforand@bcceng.com 4901 NW 17th Way, Suite 506 Fort Lauderdale, FL 33309 SR9/I-95 3C Design-Build Project All facets of Professional Engineering Design and Post Design Services for the design of five Steel Box Girder bridges (widening and retrofit of existing structures to accommodate express lanes) in Broward County, Florida. Ongoing N/A Calvin, Giordano & Associates, Inc. Bob McSweeney, PE (954) 921-7781 Fax: (954) 921-8807 BMcSweeney@cgasolutions.com 1800 Eller Drive, Suite 600 Ft Lauderdale, Florida 33316 Sunny Isles NB Emergency Bridge All facets of Professional Engineering Design, Permitting, and Post Design Services for the design of an Emergency Pedestrian Bridge in Miami-Dade County, Florida. 2017 N/A AECOM Saul Perez, PE (786) 556-3320 sperez@aecom.com 3201 W Commercial Boulevard, #134 Fort Lauderdale, Florida 33309 I-595 PPP Reversible Lanes Project All facets of Professional Engineering Design, Permitting and Post Design Services for the design of reversible lanes along I-595 in Broward, Florida. 2014 N/A F-4 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA f LARS Engineering, Inc. A. Client Name, Address, Contact, Phone and Fax Numbers and valid e-mail address; B. Project Title C. Description of work performed, including the project location D. Year completed E. Past 5 years copies of executed agreements made between your firm and local municipalities, with a scope similar to this RFQ. A&P Consulting Transportation Engineers, Corp. Erik Sibila, PE 305-283-9816 esibila@APCTE.com Pedestrian Bridge No. 879092 Initial Inspection & Report at Hard Rock Stadium Pedestrian Bridge No. 879092 located at Hard Rock Stadium over Turnpike Access Road. (Miami, FL) December 2019 Private work performed as subconsultant to APCTE FDOT District 6 1000 NW 111 Avenue Miami, FL 33172 Pablo Orozco, PE 305.470.5370 Pablo.Orozco@dot.state.fl.us Districtwide Local Government In-Depth Bridge Inspection On/Off System Responsible for performing visual routine, interim, and initial inspections for various types of bridges (365 total, within Miami Dade and Monroe County) and preparing inspection reports including repair recommendations. On-going Private worked performed as subconsultant to Marlin Engineering Inc. BMA Consulting Engineering 18503 Pines Blvd. Suite 210 Pembroke Pines, Florida 33029 Jesus Mustafa, PE 954.404.6155 jmustafa@bma-ce.com Inspection and Reporting Services to NASA / John F. Kennedy Space Center (KSC) Performed inspection of 55 fixed spans over the Indian River as part of State Road 405, and a double leaf steel bascule main span including the prestressed concrete girder and composite slab approach system, driven prestressed concrete piles with cast in place concrete caps. Prepared inspection reports and repair quantities and assisted in producing repair cost estimate. (Titusville, Florida) August 2019 Private work performed as subconsultant to BMA Consulting Engineering Inc. F-5 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA f Choice Engineering Consultants, Inc. A. Client Name, Address, Contact, Phone and Fax Numbers and valid e-mail address; B. Project Title C. Description of work performed, including the project location D. Year completed E. Past 5 years copies of executed agreements made between your firm and local municipalities, with a scope similar to this RFQ. FDOT D6 Client PM: Tiffany Gehrke (305) 470-5308 ADA D/W Consultant General Engineering Project Manager and Engineer of Record responsible for the implementation/review of ADA improvements performed by the District, ADA Plan Reviews, preparation of construction plans for ADA only improvements to be constructed through the Work Program, technical memos addressing citizen and municipality complaints. Assisted the Department as an in-house consultant supporting the Intermodal Systems Development Office in the coordination of all ADA related activities. Ongoing since 2015 N/A FDOT D6 Client PM: Ivette Funtanellas, PE (305) 470-5270 D/W Traffic Operations & Operations/Safety Engineer of Record responsible for the preparation of contract documents such as design variations, pavement designs and typical section packages as well as the production of construction plans for the implementation of traffic safety and operational improvements including signalization, addition of left turn lanes, extension of storage capacity, signing and pavement marking improvements throughout Miami-Dade County. Ongoing since 2017 N/A FDOT D6 Client PM: Julio Polo (305) 470-5335 Traffic Ops Studies Project Manager responsible for the overall management and performance of traffic engineering services to produce operational studies and other traffic engineering studies (including traffic data collection) to support the Traffic Operations Office and address citizen complaints. This contract also included efforts to support the FDOT with the maintenance and operational takeover of the traffic signals in Monroe County. Ongoing since 2017 N/A F-6 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA f Manny G Vera & Associates, Inc. A. Client Name, Address, Contact, Phone and Fax Numbers and valid e-mail address; B. Project Title C. Description of work performed, including the project location D. Year completed E. Past 5 years copies of executed agreements made between your firm and local municipalities, with a scope similar to this RFQ. O’Leary Richards Design Associates, Inc. 8525 SW 92 Street Ste C11 Miami, Fl 33156 Kathryn O’Leary Richards 305-596-6628 kathy@olearyrichards.com The City of Sunny Isles (RFQ 16-06-02) NW 174 Street Pedestrian Bridge Topographic Survey MGV was responsible for providing a Design Survey consisting of the following deliverables: the establishment of horizontal (NAD 83/90) control as needed, and the creation of Topographic at the intersection of US-1 and 174th Street. All trees were located and identified with common names. 2017 N/A Trace Consultants 8900 SW 117th Avenue, Suite 105B Miami, FL 33186 Diego Espitia, PE 786-808-0118 despitia@traceci.com FDOT District 6, Pedestrian Improvements along SR5/ Biscayne Blvd and SE 2nd Ave, TWO#38 MGV performed utility locating services including: establishing horizontal and vertical project control as needed, as well as work zone safety. Quality Level B Utility Designates were performed at 9 locations, and Utility Locates (test holes) on found utilities within a 2.5’ radius of 4 pedestrian pedestals. Ongoing MCM Corporation 6201 SW 70th Street, 2nd Fl Miami, FL 33143 Eduardo Martinez 305-541-0000 emartinez@mcm-us.com Port of Miami Terminal F MGV provided the following survey services, including: existing condition survey; foundation survey; existing pile survey; new pile layouts and new pile as-builts for 267 auger cast piles; identify existing control points, reference elevation and property line corner stakes; establish control points for building; establish and maintain a minimum of 2 benchmarks; verifying contractor’s elevations of decks (including 3 mobilizations); provide final certificates of elevation; final parcel survey; as-built survey of the building; as- built of boundary and topographic survey; setting grid lines and building corners; drainage survey; and additional elevations on existing pedestrian bridge. 2018 N/A F-7 N/A RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA f Geosol, Inc. A. Client Name, Address, Contact, Phone and Fax Numbers and valid e-mail address; B. Project Title C. Description of work performed, including the project location D. Year completed E. Past 5 years copies of executed agreements made between your firm and local municipalities, with a scope similar to this RFQ. Bentley Architects + Engineers, Inc. 651 West Warren Avenue, Suite 200 Longwood, FL 32750 Attn.: Brenton Daily, PE Ph: 407-331-6116 ext. 125 bdaily@baeonline.com Hard Rock Stadium Pedestrian Bridges Bridge #1 Over NW 199th St. & Bridge #2 Over Turnpike Access Road City of Miami Gardens, FL Geosol was the Geotechnical Engineer of Record and performed soil borings, foundation analysis, design, geotechnical report, inspections, & foundation certifications. 2019 N/A HDR, Inc. 15450 New Barn Road, Suite 304 Miami Lakes, FL 3301 Attn.: Erki Suarez, PE, Ph. 305-728-7408 erki.suarez@hdrinc.com Pedestrian Bridge over US-1, Isla Morada Monroe Co., FL FM: 442040-1 Geosol was the Geotechnical Engineer of Record and performed soil borings, foundation analysis, design and prepared geotechnical report. 2018 N/A Keith & Schnars, PA 6500 N. Andrews Ave. Fort Lauderdale, FL 33309 Attn.: Bryan Wilson, PE Ph.: 954-776-1616 CBWilson@ksfla.com West Avenue Bridge and Lincoln Court Pedestrian Bridges Over the Collins Canal City of Miami Beach, FL Geosol was the Geotechnical Engineer of Record and performed soil borings, foundation analysis, design, geotechnical report, inspections, & foundation certifications. 2017 N/A F-8 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA f Smart-Sciences, Inc. A. Client Name, Address, Contact, Phone and Fax Numbers and valid e-mail address; B. Project Title C. Description of work performed, including the project location D. Year completed E. Past 5 years copies of executed agreements made between your firm and local municipalities, with a scope similar to this RFQ. Marlin Engineering Jose Santiago 15600 SW 288th Street, Suite 208 Miami, Florida 33033 305.477.7575 jsantiago@marlinengineering.com Tree Permitting for Citywide Sidewalk Improvements Tree inventory and permitting services at five roadway segments in City of Doral 2019 N/A Miami-Dade County Vizcaya Museum and Gardens Trust Ian Simpkins 3251 South Miami Avenue Miami, FL 33129 305.860.8430 (F) 305.285.2004 ian.simpkins@vizcaya.org Vizcaya Southern Lagoon & Northern Canal Tidal Swamp Landscape Environmental Restoration, Permitting, and Sediment Sampling Landscape environmental restoration, permitting, and sediment sampling of the environmentally sensitive Southern Lagoon and Northern Canal Tidal Swamp within Vizcaya Museum and Gardens. Ongoing N/A Milian Swain and Associates for the City of Hialeah Jorge Torres 2025 SW 32nd Avenue, Suite 110 Miami, FL 33145 305-441-0123 Jtorres@milianswain.com NW 102nd Avenue Roadway Improvements Environmental permitting and contamination assessment services for the portion of NW 102nd Avenue between NW 162nd Street and NW 170th Street, City of Hialeah. Ongoing N/A F-9 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA f Janus Research A. Client Name, Address, Contact, Phone and Fax Numbers and valid e-mail address; B. Project Title C. Description of work performed, including the project location D. Year completed E. Past 5 years copies of executed agreements made between your firm and local municipalities, with a scope similar to this RFQ. Client: FDOT D6 1000 NW 111th Ave, Miami, FL 33172 Contact: Barbara Culhane (305) 470-5179 Section 106 Evaluation and Determination of Effects Case Study Report of Venetian Causeway from North Bayshore Drive in the City of Miami to Purdy Avenue in the City of Miami Beach This project consists of an effects evaluation in relation to the significant historic resources, including the bridges and causeway. The 2019 CRAS resulted in the identification of three significant resources: Collins Canal (8DA11375), Terrace Towers (8DA11754), and the Venetian Islands Resource Group (8DA14395). This report was prepared as part of a project studying several alternatives for the rehabilitation or replacement of the twelve historic Venetian Causeway bridges, which are all contributing to the Venetian Islands Resource Group (8DA14395). Ongoing N/A Client: Kisinger Campo & Associates, 201 North Franklin Street Suite 400, Tampa, Florida 33602 Contact: Jason LaBarbera (813) 871-5331 Duck Key Bridges Study, Monroe County This project consists of a historical documentation, as the MOA stipulated the documentation of four significant bridges. The project included large- format photography, the reproduction of historic drawings using archival-quality supplies, and the production of a final report documenting the work. Ongoing N/A Client: FDOT D6 1000 NW 111th Ave Miami, FL 33172 Contact: Barbara Culhane (305) 470-5179 Project Development and Environment Study Re-Evaluations Interstate 395 from the I-95/Midtown Interchange ramps to MacArthur Causeway West Channel Bridges at Biscayne Bay, Miami FL The Cultural Resources Assessment Survey was prepared as part of the re-evaluation process. Newly identified resources were documented and previously recorded resources were documented as part of this project. In addition, effects were evaluated to determine if the project would impact the significant resources. Completed January 2019 N/A F-10 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA f TLC Engineering Solutions A. Client Name, Address, Contact, Phone and Fax Numbers and valid e-mail address; B. Project Title C. Description of work performed, including the project location D. Year completed E. Past 5 years copies of executed agreements made between your firm and local municipalities, with a scope similar to this RFQ. Oniel Toledo, B.S.M.E., M.E.M., AFO, CPSI Project Coordinator City of Miami Beach 1701 Meridian Avenue, Suite 401 Miami Beach, Fl 33139 (305) 673-7730 OnielToledo@miamibeachfl.gov City of Miami Beach MEP Continuing Services MEP/FP Professional Continuing Services including: »City Hall Fire Alarm Upgrade »Parking Lot upgrades – »City Hall AHU Replacement »Fire Station #4 Assessment and HVAC Upgrades »Police Station HVAC Renovations Ongoing, estimated completion: Feb 2021 N/A Wayne Anderson Facilities Manager City of Boca Raton 201 West Palmetto Park Road Boca Raton, FL 33432 T: 561.416.3391 wanderson@ci.boca-raton.fl.us City of Boca Raton MEP Continuing Services MEP/FP Professional Continuing Services including the following projects: Woodlands Park site lighting Hughes Park site lighting Meadows Park walkway lighting Meadows Park pool lighting Building 24 Lab Hood Replacement BACE Parking lot site lighting 2018 N/A Karl Thompson Assistant City Manager City of Weston 17200 Royal Palm Boulevard Weston, Florida 33326 T: 954-385-2600 kthompson@westonfl.org City Hall HVAC Renovation Mechanical engineering for the evaluation and renovation of HVAC systems at the City Hall. 2017 N/A F-11 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA f Glob Comm, LLC A. Client Name, Address, Contact, Phone and Fax Numbers and valid e-mail address; B. Project Title C. Description of work performed, including the project location D. Year completed E. Past 5 years copies of executed agreements made between your firm and local municipalities, with a scope similar to this RFQ. Seritage Growth Properties – 500 Fifth Avenue, Suite 1530, New York, NY 10110 Contact: Project Manager, Lateisha Ashby: 201-937- 2777 Esplanade at Aventura, Aventura, FL; and Shoppes at Westland Mall, Hialeah, FL Located on the former Sears sites, these private development projects demand smooth agency coordination with county and city permitting entities and strong stakeholder communications with project neighbors and the city staff. Construction paused due to COVID. Anticipated completion Fall 2021. N/A Peace River Hydro Partners JV, Fort St. John, British Columbia, Canada Contact: Louis Brais, Project Executive: 778- 957-4480 Site C Clean Energy Project (C$9B) Dam Located in a remote location in the town of Fort St John, BC. Work on this public infrastructure project involved technical review of monthly construction progress report; Impact Mitigation Plan development review; and “Dam Safe” Safety Campaign development with training of the campaign for project dept. managers. Contract April 2017 to December 2018. Project still ongoing. N/A Bouygues Construction (for Florida Dept. of Transportation) 1050 MacArthur Causeway, Miami, FL 33150; Joe Folco, VP – Cell: 305-632-2243 The Port of Miami Tunnel ($1B-USD) Widening of the MacArthur Causeway, two additional lanes on bridge for tunnel access, and twin tubes underneath Government Cut Managed all internal and external communications with thousands of employees and the numerous project stakeholders, including state, county and city agencies for this the largest public infrastructure and first PPP project in Florida’s history; earn project buy-in via project presentations throughout community, media and industry; development of monthly construction progress report. August 3, 2014 N/A GLOB COMM, LLC F-12 SECTION C: RESUMESG. CORPORATE STANDING AND AUTHORIZED SIGNATORY CORPORATE STANDING AND AUTHORIZED SIGNATORYg UNANIMOUS JOINT RESOLUTIONS OF THE BOARD OF DIRECTORS AND SOLE SHAREHOLDER OF EAC CONSULTING, INC. IN LIEU OF A SPECIAL MEETING Effective August_, 2015 Pursuant to the Florida Business Corporation Act, the undersigned, being all of the Directors and the sole Shareholder of EAC CONSULTING, INC., a Florida corporation (the "Corporation"), do hereby consent to and adopt the following resolutions in lieu of holding a meeting, waive any notice and direct that this action be filed with the records of the Corporation. WHEREAS, the undersigned desire to amend and restate the Articles oflncorporation and the By-laws of the Corporation; WHEREAS, the undersigned have determined that it is advisable, desirable and in the best interests of the Corporation to so amend the Corporation's Articles oflncorporation and By-laws; WHEREAS, immediately following the filing of the Amended and Restated Articles, the undersigned desire to effectuate an eight hundred for one stock split for its common stock, $0.01 par value per share (the "Common Stock") such that upon such stock split, Enrique A. Crooks shall own 80,000 shares of Common Stock which shall constitute all of the outstanding capital stock of the Corporation (the "Stock Split"); and WHEREAS, the Directors desire to appoint officers of the Corporation. NOW, THEREFORE, BE IT RESOLVED, that the Amended and Restated Articles of Incorporation as previously provided to the undersigned, are hereby approved, adopted and ratified; FURTHER RESOLVED, that the Corporation is authorized and directed to file the Amended and Restated Articles of Incorporation with the Florida Secretary of State; FURTHER RESOLVED, that the Amended and Restated By-laws as previously provided to the Directors, are hereby approved, adopted and ratified by the Directors; FURTHER RESOLVED, that the Stock Split is hereby approved, adopted and ratified; FURTHER RESOLVED, that any and all prior acts of the Board of Directors and officers of the Corporation are hereby ratified, approved and confirmed in all respects as the acts and deeds of the Corporation; {M2979289;5} 28 5959 BLUE LAGOON DRIVE · SUITE 410 · MIAMI, FL 33126 · 305.265.5400 November 17, 2020 City of Sunny Isles Re: City of Sunny Isles RFQ 20-10-01 Firm’s Authorized Signatories To Whom It May Concern: The employees authorized to sign on behalf of EAC Consulting, Inc. for matters related to the City of Sunny Isles are listed on Exhibit A (attached). Sincerely, EAC Consulting, Inc. Marie Chong Secretary, Treasurer EXHIBIT A GRANTS OF AUTHORITY Dept. Manager/ Deputy Program Director/ Regional Manager Program Director/ Vice President Sr. Vice President CFO President REVENUE PRODUCING CONTRACTS WHERE EAC IS A PRIME OR A SUBCONSULTANT. Project Specific Agreements Contracts < $200,000 < $2,000,000 < $4,000,000 n/a unlimited Supplementals < $200,000 < $2,000,000 < $4,000,000 n/a unlimited Master (Work Order Driven) Agreements Contracts < $2,000,000 < $10,000,000 unlimited n/a unlimited Work Orders < $1,000,000 < $4,000,000 < $4,000,000 n/a unlimited Work Order Revisions < $1,000,000 < $4,000,000 < $4,000,000 n/a unlimited TEAMING AGREEMENTS WHERE EAC IS A PRIME OR A SUBCONSULTANT. Fee Based Agreements < 500,000 < $2,000,000 < $5,000,000 n/a unlimited Construction/Project Budget Based Agreements < $5,000,000 < $20,000,000 < $50,000,000 n/a unlimited EXPENSE PRODUCING SUBCONSULTANT AGREEMENTS WHERE EAC IS PRIME Project Specific Subconsultant Agreements Subconsultant Agreement < $200,000 < $2,000,000 < $4,000,000 n/a unlimited Amendment to Subconsultant Agreement < $200,000 < $2,000,000 < $4,000,000 n/a unlimited Master (Work Order Driven) Subconsultant Agreements Master Subconsultant Agreement < $200,000 unlimited unlimited n/a unlimited Amendment to Master Subconsultant Agreement < $200,000 unlimited unlimited n/a unlimited Work Orders < $200,000 < $2,000,000 < $4,000,000 n/a unlimited Work Order Revisions < $200,000 < $2,000,000 < $4,000,000 n/a unlimited OTHER CONTRACTS: LEASES (Operating and Capital)n/a n/a < $40,000 *< $24,000 unlimited SERVICE AGREEMENTS n/a n/a < $40,000 *< $24,000 unlimited I hereby grant authority to bind EAC Consulting, Inc. with regards to contracts as stated above. Enrique Crooks P.E.Date President * requires co-approval with the CFO. 9/23/2020 NAME POSITION Enrique Crooks, P.E.President Michael Adeife, P.E.Sr. Vice President Christopher Bucknor, P.E.Sr. Vice President Harold Desdunes, P.E.Sr. Vice President K.T. Lin, P.E.Sr. Vice President Marie Chong, CPA Sr. Vice President, CFO Ramon Borges, PE Vice President Huntley Higgins, PE Vice President Andrew Pierce, PE Vice President As per EAC Consulting's "Grants Of Authority", above are the names of those currently holding the referenced positions. Enrique Crooks P.E.Date President 9/23/2020 H. VARIATIONS/EXCEPTIONS: VARIATIONS/EXCEPTIONSh H-1 RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. CCNA VARIATIONS / EXCEPTIONS H. Variations/Exceptions: Provide a list of services which are not included in the firm’s proposal to the required services as outlined in the Scope of Services along with any exceptions or variations to any section of the proposal and explanation. Not Applicable H I. LITIGATION STATEMENT: LITIGATION STATEMENTi 5959 BLUE LAGOON DRIVE · SUITE 410 · MIAMI, FL 33126 · 305.265.5400 CITY OF SUNNY ISLES RFQ# 20-10-01 EAC Consulting, Inc. Litigation History at 11-17-2020 Status of all claims, lawsuits, arbitrations, and judgments pending or settled within the last five (5) years. Caption of the matter Case no. Court Description Resolution 2015 Monroe County v. CGC and Metric Engineering with EAC, as the design engineer added as one of three defendants in a minor civil lawsuit styled; CGV v Monroe County, EAC and Shari Ramirez, P.E., arising out of a dispute between a client, its construction contractor and its construction inspection engineer. 15-CA- 000563- P Circuit Court of the Sixteenth Judicial Circuit in and for Monroe County, Florida. Parties: Monroe County / Construct Group Corp. Metric Engineer in a breach of contract action with EAC and Shari Ramirez added for professional negligence. The case was settled and concluded at mediation with EAC offering a minor amount of $25,000 towards a much larger settlement of the matter. Final Order of Dismissal was entered on October 19th, 2016. 2015 Great American Insurance Company as Subrogee of Northgate Condominium Association Inc., v. EAC Consulting Inc., JVA Engineering Contractor Inc. and City of North Miami. 2015- 024371- CA-01 Circuit Court of the Eleventh Judicial Circuit in and for Miami- Dade County, Florida. Parties: Great American Insurance Company as Subrogee for the Northgate Condominium Associations' sued three defendants; the Contractor, JVA, the Owner; the City of North Miami and EAC for negligence. The matter was settled at mediation with EAC offering to pay its one third share of $6,000 and one half of the City’s share in the amount of $3,000 as for the City’s alleged claim for indemnification. The other half of the City’s share was paid by the Contractor. Settlement Agreements were entered into in total for $9,000 and Stipulation for Dismissal of the case was done on July 18th, 2016. 5959 BLUE LAGOON DRIVE · SUITE 410 · MIAMI, FL 33126 · 305.265.5400 2019 F.R. Aleman and Associates Inc., as Claimant against EAC Consulting Inc., as the Respondent. 01-19- 0002- 1379 American Arbitration Association (AAA) Parties: Sub-Consultant, F.R. Aleman and Associates Inc., alleged breach of contract arising out of extra As-Built Surveying work claims against the Prime Consultant, EAC Consulting Inc. as members of a design-built team with Contractor, Ric-Man Construction, Florida on a Project known as “Replacement of Water Mains and Service Conversions in the Shenandoah Area” of Miami- Dade County for the Miami- Dade County Water and Sewer Department. Pending an evidentiary hearing scheduled for November 2020 with AAA for damages alleged to be greater than $15,000. Certified By: __________________________________ _____ Print Name and Title: Marie Chong, CFO date who is authorized to sign on behalf of EAC Consulting, Inc. 11-17-2020 J. FORMS AND ATTACHMENTS FORMS AND ATTACHMENTSJ City of Sunny Isles Beach |Request for Qualifications No. 20-10-01 26 REQUIRED FORMS (Please type) PRIME FIRM SUB-CONSULTANTS Respondent intends to use the following sub-consultant on this project (if none, write “None”): Role Name of Individual Assigned to Project: Role/Description of Work: Experience: Name and address of sub-consultant: Name and address of sub-consultant: Role Name of Individual Assigned to Project Number of Years’ Experience Education, Degree Address of office: Principle-in- Charge: Project Manager Asst. Project Manager Other Key Member Other Key Member Other Key Member BS 5959 Blue Lagoon Drive, Suite 410, Miami, FL 3312634Harold Desdunes, PE K.T. Lin, PhD., P.E.34 Ph.D 5959 Blue Lagoon Drive, Suite 410, Miami, FL 33126 Stephanie Romero, PE 5959 Blue Lagoon Drive, Suite 410, Miami, FL 3312614BS Savino and Miller Design Studio 12345 NE 6th Avenue North Miami, FL 33161 Bridge $UFKLWHFWXUHDQG Landscape $UFKLWHFWXUH West 8 Urban Design & Landscape Architecture Bridge $UFKLWHFWXUHDQG /DQGVFDSH $UFKLWHFWXUH City of Sunny Isles Beach |Request for Qualifications No. 20-10-01 28 PROJECT VERIFICATION FORM Respondent must have completed the design and permitting of at least one (1) pedestrian bridge project in the past ten (10) years. The completed projects meeting this minimum qualification may have been performed by the individual, firm, or project manager assigned to the Work.PLEASE TYPE. 1)Name of Client Entity: ______________________________________________ Address: __________________________________________________________ City/State/Zip: ______________________________________________________ Contact: __________________________________________________________ Title: _____________________________________________________________ Email Address:____________________________________________________ Telephone: ________________________________________________________ Scope of Work: _____________________________________________________ Contract Start/End Dates: _____________________________________________ Consultant Contract Amount: $_________________________________________ 2)Name of Client Entity: ______________________________________________ Address: __________________________________________________________ City/State/Zip: ______________________________________________________ Contact: __________________________________________________________ Title: _____________________________________________________________ Email Address:____________________________________________________ Telephone: ________________________________________________________ Scope of Work: _____________________________________________________ Contract Start/End Dates: _____________________________________________ Consultant Contract Amount: $_________________________________________ 3)Name of Client Entity: ______________________________________________ Address: __________________________________________________________ City/State/Zip: ______________________________________________________ Contact: __________________________________________________________ Title: _____________________________________________________________ Email Address:_____________________________________________________ Telephone: ________________________________________________________ Scope of Work: _____________________________________________________ Contract Start/End Dates: _____________________________________________ Consultant Contract Amount: $_________________________________________ END OF SECTION City of Miami Gardens 18605 NW 27th Avenue Miami Gardens, FL 33056 Les Pettit Public Work City Engineer lpettit@miamigardens-fl.gov 305-622-8000 ext. 2570 Design of 2 Pedestrian Bridges at Hard Rock Stadium July 2018-January 2020 514,908 A&P Consulting Transportation Engineers 8935 NW 35th Lane, Ste 200 Doral, FL 33172 Carlos M. Gil-Mera Principal cmgil@apcte.com 305-592-7283 Pedestrian Bridge Analysis and Design June 15, 2018-Present 86,000 ADDENDUM # 1 DATE: November 13, 2020 TO: ALL PROPOSERS FROM: Purchasing Administrator TITLE: RFQ 20-10-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174TH ST. CCNA SUBJECT: Addendum No. 1 BID SUBMITTAL DEADLINE: Friday, November 20, 2020 at 2:30 PM Please attach this addendum to the documents in your possession and include the Acknowledgement of Addenda form with your response incorporated in the RFQ. This addendum is and does become a part of the RFQ. Questions & Answers: 1. Are there any plans and project information available for the 180th Street and Collins Avenue Pedestrian Bridge? A. Final Plans for 180th Street and Collins Ave are not completed at this time. 2. Are there any CADD files available for this project? A. No CADD files available at this time. 3. How many people are on the Technical Review Committee? Please identify their names and expertise. A. Committee not determined at this time. 4. Is there a project schedule available? When does the City expect the project to be completed? A. Below is the suggested tentative schedule: Design and permitting – February 2022 Right of Way Certification – December 2021 Construction contract to be let – October 2023 Completion – December 2025 5. Will the project selection be a one-step or two-step process? A. The RFQ will adhere to the Florida Statutes CCNA process. 6. Who is the Project Manager? A. Claudia C. Hasbun, Planning and Zoning Director 7. Hardesty & Hanover respectfully requests an updated tentative project schedule for this design project. A. Refer to question # 4. 8. Is the City looking for a prime Company that cover all categories or individuals Companies? The prime firm does not need to be prequalified in all categories themselves. Sub-consultants can cover work groups, however based on the FHWA 1273, the prime firm shall perform with its own organization contract work amounting to not less than 30 percent (or a greater percentage if specified elsewhere in the contract) of the total original contract price. Principal Savino & Miller Design Studio 12345 NE 6th Avenue, Suite A North Miami, FL 33161 EQUAL OPPORTUNITY / AFFIRMATIVE ACTION City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 EQUAL OPPORTUNITY/AFFIRMATIVE ACTION STATEMENT The contractors and all subcontractors hereby agree to a commitment to the principles and practices of equal opportunity in employment and to comply with the letter and spirit of federal, state, and local laws and regulations prohibiting discrimination based on race, color, religion, national region, sex, age, handicap, marital status, and political affiliation or belief. Signed: ________________________________________ Title: ________________________________________ Firm: ________________________________________ Address: ________________________________________ ________________________________________ DECEMBER 28, 2010 President Adrian Leon LARS Engineering Inc. 7225 NW 25th Street, Suite 211, Miami, FL 33122 (48$/23325781,7< $)),50$7,9($&7,21 City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax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resident Geosol, Inc. 5795-A NW 151st Street Miami Lakes, FL 33014 EQUAL OPPORTUNITY / AFFIRMATIVE ACTION City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 EQUAL OPPORTUNITY/AFFIRMATIVE ACTION STATEMENT The contractors and all subcontractors hereby agree to a commitment to the principles and practices of equal opportunity in employment and to comply with the letter and spirit of federal, state, and local laws and regulations prohibiting discrimination based on race, color, religion, national region, sex, age, handicap, marital status, and political affiliation or belief. Signed: ________________________________________ Title: ________________________________________ Firm: ________________________________________ Address: ________________________________________ ________________________________________ DECEMBER 28, 2010 EQUAL OPPORTUNITY / AFFIRMATIVE ACTION City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 EQUAL OPPORTUNITY/AFFIRMATIVE ACTION STATEMENT The contractors and all subcontractors hereby agree to a commitment to the principles and practices of equal opportunity in employment and to comply with the letter and spirit of federal, state, and local laws and regulations prohibiting discrimination based on race, color, religion, national region, sex, age, handicap, marital status, and political affiliation or belief. Signed: ________________________________________ Title: ________________________________________ Firm: ________________________________________ Address: ________________________________________ ________________________________________ DECEMBER 28, 2010 Principal/South Florida Operations Director TLC Engineering Solutions, Inc. 5757 Blue Lagoon Drive, #400 Miami, FL 33126 EQUAL OPPORTUNITY / AFFIRMATIVE ACTION City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 EQUAL OPPORTUNITY/AFFIRMATIVE ACTION STATEMENT The contractors and all subcontractors hereby agree to a commitment to the principles and practices of equal opportunity in employment and to comply with the letter and spirit of federal, state, and local laws and regulations prohibiting discrimination based on race, color, religion, national region, sex, age, handicap, marital status, and political affiliation or belief. Signed: ________________________________________ Title: ________________________________________ Firm: ________________________________________ Address: ________________________________________ ________________________________________ DECEMBER 28, 2010 Verified by PDFFiller 11/19/2020 CEO GLOBCOMM, LLC 481 Ives Dairy Road, #D203, Miami, FL 33179 ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED? INSR ADDL SUBR LTR INSD WVD PRODUCER CONTACT NAME: FAXPHONE (A/C, No):(A/C, No, Ext): E-MAIL ADDRESS: INSURER A : INSURED INSURER B : INSURER C : INSURER D : INSURER E : INSURER F : POLICY NUMBER POLICY EFF POLICY EXPTYPE OF INSURANCE LIMITS(MM/DD/YYYY) (MM/DD/YYYY) AUTOMOBILE LIABILITY UMBRELLA LIAB EXCESS LIAB WORKERS COMPENSATION AND EMPLOYERS' LIABILITY DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) AUTHORIZED REPRESENTATIVE EACH OCCURRENCE $ DAMAGE TO RENTEDCLAIMS-MADE OCCUR $PREMISES (Ea occurrence) MED EXP (Any one person) $ PERSONAL & ADV INJURY $ GEN'L AGGREGATE LIMIT APPLIES PER:GENERAL AGGREGATE $ PRO-POLICY LOC PRODUCTS - COMP/OP AGGJECT OTHER:$ COMBINED SINGLE LIMIT $(Ea accident) ANY AUTO BODILY INJURY (Per person) $ OWNED SCHEDULED BODILY INJURY (Per accident) $AUTOS ONLY AUTOS HIRED NON-OWNED PROPERTY DAMAGE $AUTOS ONLY AUTOS ONLY (Per accident) $ OCCUR EACH OCCURRENCE CLAIMS-MADE AGGREGATE $ DED RETENTION $ PER OTH- STATUTE ER E.L. EACH ACCIDENT E.L. DISEASE - EA EMPLOYEE $ If yes, describe under E.L. DISEASE - POLICY LIMITDESCRIPTION OF OPERATIONS below INSURER(S) AFFORDING COVERAGE NAIC # COMMERCIAL GENERAL LIABILITY Y / N N / A (Mandatory in NH) SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). COVERAGES CERTIFICATE NUMBER:REVISION NUMBER: CERTIFICATE HOLDER CANCELLATION © 1988-2015 ACORD CORPORATION. All rights reserved.ACORD 25 (2016/03) CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY) $ $ $ $ $ The ACORD name and logo are registered marks of ACORD 11/17/2020 (703) 827-2277 (703) 827-2279 30104 EAC Consulting, Inc. 5959 Blue Lagoon Drive Suite 410 Miami, FL 33126 27120 29424 29459 31194 A 1,000,000 42UUNOL5044 7/1/2020 7/1/2021 300,000 Contractual Liab.10,000 1,000,000 2,000,000 2,000,000 1,000,000B 42UENOL5166 7/1/2020 7/1/2021 5,000,000C 42XHUOL5045 7/1/2020 7/1/2021 5,000,000 10,000 D 42WEOL6H10 7/1/2020 7/1/2021 1,000,000 Y 1,000,000 1,000,000 E Professional 107279653 7/1/2020 Per Claim 5,000,000 E Liability 107279653 7/1/2020 7/1/2021 Aggregate 10,000,000 RE: RFQ 20-10-01 PROFESSIONAL ENGINEERING AND ARCHITECTURAL SERVICES FOR PEDESTRIAN BRIDGE WITH PARK ELEMENTS ACROSS A1A AT 174TH ST. CCNA City of Sunny Isles Beach is included as additional insured with respects to General Liability, Auto Liability and Umbrella Liability when required by written contract. General Liability includes Additional Insured coverage for On-Going & Completed Operations as required by written contract. SEE ATTACHED ACORD 101 City of Sunny Isles Beach (PROPOSAL PURPOSES) Sunny Isles Beach Government Center 18070 Collins Avenue 4th Floor Sunny Isles Beach, FL 33160 EACCONS-01 KSANCHEZ Ames & Gough 8300 Greensboro Drive Suite 980 McLean, VA 22102 admin@amesgough.com Hartford Underwriters Insurance Company A+ (XV) Trumbull Insurance Company A+ (XV) Hartford Casualty Insurance Company A+ (XV) Twin City Fire Insurance Company A+ (XV) Travelers Casualty & Surety Co. of America A++, XV X 7/1/2021 X X X X X X X X FORM NUMBER: EFFECTIVE DATE: The ACORD name and logo are registered marks of ACORD ADDITIONAL REMARKS ADDITIONAL REMARKS SCHEDULE FORM TITLE: Page of THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, ACORD 101 (2008/01) AGENCY CUSTOMER ID: LOC #: AGENCY NAMED INSURED POLICY NUMBER CARRIER NAIC CODE © 2008 ACORD CORPORATION. All rights reserved. Ames & Gough EACCONS-01 SEE PAGE 1 1 SEE PAGE 1 ACORD 25 Certificate of Liability Insurance 1 SEE P 1 EAC Consulting, Inc. 5959 Blue Lagoon Drive Suite 410 Miami, FL 33126 SEE PAGE 1 KSANCHEZ 1 Description of Operations/Locations/Vehicles: General Liability, Automobile Liability, and Umbrella Liability are primary and non-contributory over any existing insurance and limited to liability arising out of the operations of the named insured and when required by written contract. General Liability, Automobile Liability, Workers Compensation and Umbrella Liability policies include a waiver of subrogation in favor of the additional insureds where permissible by state law and when required by written contract. 30-day Notice of Cancellation will be issued for the General Liability, Umbrella Liability, Workers Compensation and Professional Liability policies in accordance with policy terms and conditions. Umbrella Liability coverage sits excess over General Liability, Automobile Liability, and Employers Liability coverage. City of Sunny Isles Beach • RFQ 20-10-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. LICENSES EAC Consulting, Inc. LBTLocal Business Tax Receipt Miami-Dade County, State of Florida -THIS IS NOT A BILL - DO NOT PAY BUSINESS NAME/LOCATION RECEIPT NO. EXPIRES Must be displayed at place of business Pursuant to County Code PAYMENT RECEIVED BY TAX COLLECTOR Chapter 8A - Art. 9 & 10 OWNER SEC. TYPE OF BUSINESS For more information, visit www.miamidade.gov/taxcollector The RECEIPT NO. above must be displayed on all commercial vehicles - Miami-Dade Code Sec 8a-276. This Local Business Tax Receipt only conrms payment of the Local Business Tax. The Receipt is not a license, permit, or a certication of the holder’s qualications, to do business. Holder must comply with any governmental or nongovernmental regulatory laws and requirements which apply to the business. CREDITCARD-20-0640921Employee(s) 3626679 E A C CONSULTING INC 5959 BLUE LAGOON DR STE 410 MIAMI, FL 33126 75.00 3789279 212 SEPTEMBER 30, 2021 P.A./CORP/PARTNERSHI P/FIRM RENEWAL 08/05/2020 E A C CONSULTING INC C/O ENRIQUE CROOKS PRES Minority Business Certification EAC Consulting Inc. 10/17/2019 10/17/2021 City of Sunny Isles Beach • RFQ 20-10-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. LICENSES EAC Consulting, Inc. Safety, Mobility, Innovation www.fdot.gov Group 10 -Construction Engineering Inspection 10.1 -Roadway Construction Engineering Inspection 10.3 -Construction Materials Inspection 10.4 -Minor Bridge & Miscellaneous Structures CEI Your firm is now technically prequalified with the Department for Professional Services in the above referenced work types. The overhead audit has been accepted, and your firm may pursue projects in the referenced work types with fees of any dollar amount. This status shall be valid until June 30, 2021 for contracting purposes. Approved Rates Home/ Branch Overhead Field Overhead Facilities Capital Cost of Money Premium Overtime Reimburse Actual Expenses Home Direct Expense Field Direct Expense 161.63%121.74%0.727%Excluded No 3.21%7.29%* *Rent and utilities excluded from field office rate. These costs will be directly reimbursed on contracts that require the consultant to provide field office. Per Title 23, U.S. Code 112, there are restrictions on sharing indirect cost rates. Refer to Code for additional information. Should you have any questions, please feel free to contact me by email at carliayn.kell@dot.state.fl.us or by phone at 850-414-4597. Sincerely, Carliayn Kell Professional Services Qualification Administrator City of Sunny Isles Beach • RFQ 20-10-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. LICENSES EAC Consulting, Inc. Halsey Beshears, SecretaryRon DeSantis, Governor STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF PROFESSIONAL ENGINEERS THE ENGINEERING BUSINESS HEREIN IS AUTHORIZED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES EAC CONSULTING, INC. Do not alter this document in any form. 5959 BLUE LAGOON DRIVE LICENSE NUMBER: CA7011 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. SUITE 410 MIAMI FL 33126 Always verify licenses online at MyFloridaLicense.com JONATHAN ZACHEM, SECRETARYRICK SCOTT, GOVERNOR STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES RODRIGUEZ, EVELYN LINETTE Do not alter this document in any form. 2351 DOUGLAS ROAD LICENSE NUMBER: PE78548 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. APT 909 MIAMI FL 33145 Always verify licenses online at MyFloridaLicense.com Halsey Beshears, SecretaryRon DeSantis, Governor STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES HIGGINS, HUNTLEY GLENMORE Do not alter this document in any form. 14255 NW 21 STREET LICENSE NUMBER: PE60726 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. PEMBROKE PINES FL 33028 Always verify licenses online at MyFloridaLicense.com Halsey Beshears, SecretaryRon DeSantis, Governor STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES WANG, NING Do not alter this document in any form. 6827 NW 110TH WAY LICENSE NUMBER: PE66993 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. PARKLAND FL 33076 Always verify licenses online at MyFloridaLicense.com City of Sunny Isles Beach • RFQ 20-10-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. LICENSES EAC Consulting, Inc. Ron DeSantis, Governor STATE OF FLORIDA BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES QUIROZ, CESAR IVAN Do not alter this document in any form. 3552 WEST 93 PLACE LICENSE NUMBER: PE59472 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. HIALEAH FL 33018 Always verify licenses online at MyFloridaLicense.com Halsey Beshears, SecretaryRon DeSantis, Governor STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES BORGES, RAMON Do not alter this document in any form. 1141 NW 134 AVE LICENSE NUMBER: PE61622 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. MIAMI FL 33182 Always verify licenses online at MyFloridaLicense.com Halsey Beshears, SecretaryRon DeSantis, Governor STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES CROOKS, ENRIQUE ALEXANDER Do not alter this document in any form. 723 CRANDON BLVD. APT. #406 LICENSE NUMBER: PE42528 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. KEY BISCAYNE FL 33149 Always verify licenses online at MyFloridaLicense.com Ron DeSantis, Governor STATE OF FLORIDA BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES SHIRAZI, SATIAR A. Do not alter this document in any form. 320 JEFFERSON AVENUE LICENSE NUMBER: PE75734 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. APT. 4 MIAMI BEACH FL 33139 Always verify licenses online at MyFloridaLicense.com Ron DeSantis, Governor STATE OF FLORIDA BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES ROMERO, STEPHANIE Do not alter this document in any form. 3360 NW 91ST AVENUE LICENSE NUMBER: PE77593 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. DORAL FL 33172 Always verify licenses online at MyFloridaLicense.com City of Sunny Isles Beach • RFQ 20-10-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. LICENSES EAC Consulting, Inc. JONATHAN ZACHEM, SECRETARYRICK SCOTT, GOVERNOR STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES DAGLY, DINESH NYALCHAND Do not alter this document in any form. 10198 S W 18TH ST LICENSE NUMBER: PE29386 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. DAVIE FL 33324 Always verify licenses online at MyFloridaLicense.com Ron DeSantis, Governor STATE OF FLORIDA BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES TIRADO, HERMAN DAVID Do not alter this document in any form. 799 WOLF CREEK STREET LICENSE NUMBER: PE36910 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. CLERMONT FL 34711 Always verify licenses online at MyFloridaLicense.com JONATHAN ZACHEM, SECRETARYRICK SCOTT, GOVERNOR STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES PATEL, SHAN B Do not alter this document in any form. 901 PONCE DE LEON BLVD LICENSE NUMBER: PE83723 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. SUITE 900 CORAL GABLES FL 33134 Always verify licenses online at MyFloridaLicense.com JONATHAN ZACHEM, SECRETARYRICK SCOTT, GOVERNOR STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES ALFARO, JENNER M Do not alter this document in any form. 14473 SW 113TH LANE LICENSE NUMBER: PE51855 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. MIAMI FL 331860000 Always verify licenses online at MyFloridaLicense.com City of Sunny Isles Beach • RFQ 20-10-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. LICENSES EAC Consulting, Inc. Halsey Beshears, SecretaryRon DeSantis, Governor STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES LI, CHUN Do not alter this document in any form. 2008 ISLAND CIRCLE LICENSE NUMBER: PE63052 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. WESTON FL 33326 Always verify licenses online at MyFloridaLicense.com Halsey Beshears, SecretaryRon DeSantis, Governor STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES ADEIFE, MICHAEL ADEBOWALE Do not alter this document in any form. 815 NW 57 AVENUE LICENSE NUMBER: PE56094 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. SUITE 402 MIAMI FL 33126 Always verify licenses online at MyFloridaLicense.com City of Sunny Isles Beach • RFQ 20-10-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. LICENSES Savino & Miller Design Studio, PA City of Sunny Isles Beach • RFQ 20-10-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. LICENSES West 8 Urban Design & Landscape Architecture P.C. Corp. Document Number FEI/EIN Number Date Filed State Status Department of State /Division of Corporations /Search Records /Search by Entity Name / Detail by Entity Name Foreign Profit Corporation WEST 8 URBAN DESIGN & LANDSCAPE ARCHITECTURE P.C. CORP Cross Reference Name WEST 8 URBAN DESIGN & LANDSCAPE ARCHITECTURE P.C. Filing Information F19000001898 27-2134009 04/18/2019 PA ACTIVE Principal Address 333 HUDSON STREET, STE 905 NEW YORK, NY 10013 Mailing Address 333 HUDSON STREET, STE 905 NEW YORK, NY 10013 Registered Agent Name & Address CORPORATION SERVICE COMPANY 1201 HAYS STREET TALLAHASSEE, FL 32301-2525 Officer/Director Detail Name & Address Title C,P GEUZE, ADRIAAN 333 HUDSON STREET, STE 905 NEW YORK, NY 10013 Title S SCHWEMMER, ASHLEY 333 HUDSON STREET, STE 905 NEW YORK, NY 10013 Annual Reports Report Year Filed Date Dඑඞඑඛඑඖ ඎ CකකඉගඑඖඛFlorida Department of State Halsey Beshears, SecretaryRon DeSantis, Governor STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF LANDSCAPE ARCHITECTURE THE LANDSCAPE ARCHITECT BUSINESS HEREIN HAS REGISTERED UNDER THE PROVISIONS OF CHAPTER 481, FLORIDA STATUTES WEST 8 URBAN DESIGN AND LANDSCAPE ARCHITECTURE PC Do not alter this document in any form. 333 HUDSON STREET STE 905 LICENSE NUMBER: LC26000639 EXPIRATION DATE: NOVEMBER 30, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. NEW YORK NY 10013 Always verify licenses online at MyFloridaLicense.com City of Sunny Isles Beach • RFQ 20-10-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. LICENSES ASA Consultants, Inc. Ron DeSantis, Governor STATE OF FLORIDA BOARD OF PROFESSIONAL ENGINEERS THE ENGINEERING BUSINESS HEREIN IS AUTHORIZED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES ASA CONSULTANTS, INC. Do not alter this document in any form. 510 SHOTGUN ROAD LICENSE NUMBER: CA30932 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. SUITE 402 SUNRISE FL 33236 Always verify licenses online at MyFloridaLicense.com City of Sunny Isles Beach • RFQ 20-10-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. LICENSES LARS Engineering, Inc. Ron DeSantis, Governor STATE OF FLORIDA BOARD OF PROFESSIONAL ENGINEERS THE ENGINEERING BUSINESS HEREIN IS AUTHORIZED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES LARS ENGINEERING, INC. Do not alter this document in any form. 7225 NW 25 ST LICENSE NUMBER: CA32816 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. UNIT 211 MIAMI FL 33122 Always verify licenses online at MyFloridaLicense.com City of Sunny Isles Beach • RFQ 20-10-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. LICENSES Choice Engineering Consultants, Inc. JONATHAN ZACHEM, SECRETARYRICK SCOTT, GOVERNOR STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF PROFESSIONAL ENGINEERS THE ENGINEERING BUSINESS HEREIN IS AUTHORIZED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES CHOICE ENGINEERING CONSULTANTS, INC. Do not alter this document in any form. 12855 SW 132ND ST LICENSE NUMBER: CA31116 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. SUITE 202 MIAMI FL 33186 Always verify licenses online at MyFloridaLicense.com City of Sunny Isles Beach • RFQ 20-10-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. LICENSES Manuel G. Vera & Associates, Inc. City of Sunny Isles Beach • RFQ 20-10-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. LICENSES Geosol, Inc. Halsey Beshears, SecretaryRon DeSantis, Governor STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF PROFESSIONAL ENGINEERS THE ENGINEERING BUSINESS HEREIN IS AUTHORIZED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES GEOSOL, INC. Do not alter this document in any form. 5975-A NW 151ST STREET LICENSE NUMBER: CA8530 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. MIAMI LAKES FL 33014 Always verify licenses online at MyFloridaLicense.com Halsey Beshears, SecretaryRon DeSantis, Governor STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES ISMAIL, ADNAN A. Do not alter this document in any form. 17916-C NW 67TH AVENUE, C LICENSE NUMBER: PE76014 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. HIALEAH FL 33015 Always verify licenses online at MyFloridaLicense.com Halsey Beshears, SecretaryRon DeSantis, Governor STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES RICCOBONO, ORACIO Do not alter this document in any form. 5168 LAKEWOOD DRIVE LICENSE NUMBER: PE49324 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. COOPER CITY FL 33330 Always verify licenses online at MyFloridaLicense.com City of Sunny Isles Beach • RFQ 20-10-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. LICENSES Smart-Sciences, Inc. City of Sunny Isles Beach • RFQ 20-10-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. LICENSES Janus Research State of Florida Department of State I certify from the records of this office that JANUS RESEARCH,INC.is a corporation organized under the laws of the State of Florida,filed on August 29, 1969. The document number of this corporation is 351512. I further certify that said corporation has paid all fees due this office through December 31,2020,that its most recent annual report/uniform business report was filed on January 2,2020,and that its status is active. I further certify that said corporation has not filed Articles of Dissolution. Given under my hand and the Great Seal of the State of Florida at Tallahassee,the Capital,this the Second day of January,2020 Tracking Number:2545865615CC To authenticate this certificate,visit the following site,enter this number,and then follow the instructions displayed. https://services.sunbiz.org/Filings/CertificateOfStatus/CertificateAuthentication City of Sunny Isles Beach • RFQ 20-10-01 • Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. LICENSES TLC Engineering Solutions Ron DeSantis, Governor STATE OF FLORIDA BOARD OF PROFESSIONAL ENGINEERS THE ENGINEERING BUSINESS HEREIN IS AUTHORIZED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES TLC ENGINEERING SOLUTIONS, INC. Do not alter this document in any form. 255 SOUTH ORANGE AVE LICENSE NUMBER: CA15 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. SUITE 1600 ORLANDO FL 32801 Always verify licenses online at MyFloridaLicense.com JONATHAN ZACHEM, SECRETARYRICK SCOTT, GOVERNOR STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF PROFESSIONAL ENGINEERS THE PROFESSIONAL ENGINEER HEREIN IS LICENSED UNDER THE PROVISIONS OF CHAPTER 471, FLORIDA STATUTES BAEZA, RALPH Do not alter this document in any form. 930 OPAL TERRACE LICENSE NUMBER: PE42641 EXPIRATION DATE: FEBRUARY 28, 2021 This is your license. It is unlawful for anyone other than the licensee to use this document. WESTON FL 33326 Always verify licenses online at MyFloridaLicense.com CONTACT K.T. LIN, PE, PHD PROJECT MANAGER 305-265-5400 klin@eacconsult.com MIAMI 5959 Blue Lagoon Drive, Suite 410 Miami, Florida 33126 t: 305-265-5400 f: 305-264-5507 FORT LAUDERDALE 5100 NW 33rd Avenue, Suite 243 Ft. Lauderdale, Florida 33309 t: 954-714-2000 f: 954-733-8604 WEST PALM BEACH 1601 Belvedere Road South Tower, Suite 205 West Palm Beach, Florida 33406 t: 561-812-5178 ORLANDO 500 Winderley Place, Suite 222 Maitland, Florida 32751 t: 407-254-4150 f: 407-420-4756 CONTACT K.T. Lin, PE, PhD Project Manager 305-265-5400 klin@eacconsult.com