HomeMy WebLinkAboutReso 2020-3137RESOLUTION NO. 2020 -__S131 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, APPROVING CHANGE ORDER NO. 7 TO THE AGREEMENT WITH NUNEZ CONSTRUCTION, INC. FOR THE GATEWAY PARK CENTER PROJECT, IN AN AMOUNT NOT TO EXCEED NINETY-TWO THOUSAND NINE HUNDRED EIGHT DOLLARS AND SIXTY-ONE CENTS ($92,908.61), ATTACHED HERETO AS EXHIBIT "A"; AUTHORIZING THE CITY MANAGER SIGN SAID CHANGE ORDER NO. 7 AND TO DO ALL THINGS NECESSARY TO EFFECTUATE THIS RESOLUTION; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, on June 20, 2019 via Resolution No. 2019-2952, the City Commission awarded Invitation to Bid ("ITB") No. 19-01-01 to, and entered into an agreement with, Nunez Construction, Inc. ("Contractor") for the Gateway Park Center Project, in an amount not to exceed $6,723,586.00; and WHEREAS, on October 17, 2019 via Resolution No. 2019-3003, the City Commission approved Change Order No. 1 for the installation of three (3) new grease interceptors and the re- routing of the grease line, in an amount not to exceed $73,869.57, bringing the total contract amount not to exceed $6,797,455.57; and WHEREAS, on February 20, 2020 via Resolution No. 2020-3041, the City Commission ratified Change Order No. 2 for the reduction of one (1) grease receptor and appurtenances, and approved Change Order No. 3 for the addition of auto tracking cameras and video recording, additional costs associated with the expansion of a storage area and additional credits for direct material purchases relating to the Agreement with the Contractor, resulting in a credit to the City in the amount of $1,133,473.90, thereby reducing the total contract amount not to exceed $5,756,153,41; and WHEREAS, on June 18, 2020 via Resolution No. 2020-3065, the City Commission approved Change Order No. 4 to add door locks to interior glass doors, reroute existing fire sprinklers, upgrade of two (2) existing card readers, and upgrade of washer and dryer to stackable commercial grade equipment, in an amount not to exceed $23,121.80; thereby bringing the total contract amount not to exceed $5,779,275.21; and WHEREAS, on September 17th, 2020 via Resolution No. 2020-3101 ("Reso 2020- 3101"), the City Commission approved Change Order No. 5 for the installation of an annunciator panel, cellular radio, and the addition of epoxy flooring and floor mat in the kiosk area, in an amount not to exceed $14,623.67; and WHEREAS, the City Commission, via Reso 2020-3101, approved Change Order No. 6 to add a separate electrical feed for AHU #8, sealing of the exterior of the building, replacement of a damaged window, AC intake duct replacement at the Kiosk, upgrade of the AC filters, and upgrade of the card readers and access control, in an amount not to exceed $47,520.21; and R2020 Approve CO 7 to Agmt w Nunez Const for Gateway Park Ctr Page 1 of 3 WHEREAS, the Contractor has submitted Changer Order No. 7 for upgrades to the garage fire alarms system, and a 365-day contract extension to allow for analysis of electrical usage in order to design and install an emergency generator; and WHEREAS, the City now wishes to approve Change Order No. 7 to the Agreement with Nunez Construction, Inc. for the Gateway Park Center Project for additional services, in an amount not to exceed Ninety -Two Thousand Nine Hundred Eight Dollars and Sixty -One Cents ($92,908.61), bringing the total contract amount not to exceed Five Million Nine Hundred Thirty - Four Thousand Three Hundred Twenty -Seven Dollars and Seventy Cents ($5,934,327.70), attached hereto as Exhibit "A". NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, AS FOLLOWS: Section 1. Approval of Change Order No. 7. The City Commission hereby approves Change Order No. 7 to the Agreement with Nunez Construction, Inc. for the Gateway Park Center Project for additional services, in an amount not to exceed Ninety -Two Thousand Nine Hundred Eight Dollars and Sixty -One Cents ($92,908.61), bringing the total contract amount not to exceed Five Million Nine Hundred Thirty -Four Thousand Three Hundred Twenty -Seven Dollars and Seventy Cents ($5,934,327.70), attached hereto as Exhibit "A". Section 2. Authorization of City Manager. The City Manager is hereby authorized to sign said Change Order No. 7, and to do all things necessary to effectuate this Resolution. Section 3. Effective Date. This Resolution will become effective upon adoption. PASSED AND ADOPTED this 19th day o f/Tgoven�ber 2020. George H. Scholl, R2020 Approve CO 7 to Agmt w Nunez Const for Gateway Park Ctr Page 2 of 3 APPROVED AS TO FORM AND LEG SUFFICIENCY: d A. Dion, ity Attorney Moved by: U I ' - V E CM A( Seconded by: �dUl IM! SSA �nl�Q- (�t DI�DI'yi Vote: Mayor Scholl Vice Mayor Svechin Commissioner Goldman Commissioner Lama Commissioner Viscarra (Yes) (No) ✓ (Yes) (No) �— (Yes) (No) (Yes) (No) (Yes) (No) R2020 Approve CO 7 to Agmt w Nunez Const for Gateway Park Ctr Page 3 of 3 Item Coversheet Page 1 of t SvNYY ISCffr City of Sunny Isles Beach OF 3� 18070 Collins Avenue Sunny Islas Beach, Florida 33160 (305)947-06a6City Hall r" oo s•, . "� (305) 949-3113 Fax MEMORANDUM TO: The Honorable Mayor and City Commission VIA: Christopher J. Russo, City Manager FROM: Richard Labinsky, P.E., City Engineer DATE: 11/19/2020 Resolution Approving Change Order #7 to the RE: Agreement with Nunez Construction for the Gateway Park Center RECOMMENDATION: Staff is recommending the City Commission approve the attached Resolution. REASONS: ADDITIONAL INFORMATION: The City of Sunny Isles Beach is in need of Nunez Construction to provide additional services because the original contract is changed as follows: Upgrading of the garage fire alarm system for all 4 floors as required by the Miami -Dade Fire Department during inspection for the Temporary Certificate of Occupancy for the building. Also as part of this change order request, we are requesting a 365 day contract time extension to allow for analysis of the electrical usage of the completed build out for the design and installation of an emergency generator for the building. The total cost of these additional services is in an amount not to exceed $92,908.61 FUNDING SOURCE: 300-6-5720-465000-15001 ATTACHMENTS: Description CO #7 Request 022 to Item Number: 10.D. https://sunnyisles.novusagenda.com/AgendaWeb/CoverSheet.aspx?ItemID=2864 10/28/2020 CITY OF SUNNY ISLES BEACH r� 2� rLp�� h0 c'rr OF 3UN P��O CHANGE ORDER NUMBER: 7 RFP NUMBER: 19-0101 RESOLUTION NUMBER: 201 DATE: November 19, 2020 PROJECT: Gateway Park Center ORIGINAL DOLLAR CONTRACT AMOUNT: $ 6,723,586.00 NET TOTAL DOLLAR VALUE OF ALL PREVIOUS CHANGE ORDERS, $ ,882,166.91 DOLLAR AMOUNT OF THIS CHANGE ORDER: $ 92,908.61 CREDIT / DIRECT PURCHASES: $ 0 NEW DOLLAR CONTRACT AMOUNT: $ 5,934327.70 ORIGINAL CONTRACT COMPLETION DATE June 8, 2020 TOTAL OF PREVIOUS CHANGE ORDER DAYS: 28 AMOUNT OF DAYS PER THIS CHANGE ORDER: 365 NEW CONTRACT COMPLETION DATE: July, 6, 2021 DESCRIPTION OF SCOPE OR WORK CHANGES: The Contract is changed as follows: Upgrading of the garage fire alarm system for all 4 floors as required by the Miami -Dade Fire Department during Inspection for the Temporary Certificate of Occupancy for the building. Also as part of this change order we are requesting a 365 day contract time extension to allow for analysis of the electrical usage of the completed build out for the design and installation of an emergency generator for the building. NOTE: Unless specifically stated clearly elsewhere on this page, this contract amendment does NOT include an extension of time or grant any additional general conditions amounts. The City and the Contractor agree that the contract time adjustment and a eed to i� ddFul�ent constitute a full and complete settlement of the matters set forth herein, Including all direct and indirect costs fore e , manpa r, m/a 11als, nvarhead. nrntit and deliv rMatinn M the Issues set forth In Hiis dncument. CONTRACTOR Carlos Nunez CITY ATTORNEY: Edward Dion��...- PROJECT MANAGER: Rick Labinsky ,L CITY MANAGER: Christopher J. Russo NUNEZ CONSTRVCTION Request for Change Order 022 October 20, 2020 Rick Labinsky, PE City Engineer 78070 Collins Avenue Sunny IslesBeach, F1.33760 Re: SIB -Gateway Park Additional Fire Alarm Devices Dear Mr. Labinsky, Attached for your review & approval please find the cost of purchase and installationof allequipment and labor necessary for the installationof the new firealarm devices as requested by Miami Dade County fire department for the Gateway Park Cer:t i?. Sincerely, Edsel Martinez, S - �' .a Manager Approved by: 10/26/20 Rick Labinsky, PE. 61 Date 10/22/2020 Ana Marin, Sr. Interior PM Date 6400 S.W. 62nd Ave. 305 774 9000 South Miami, FL 33143 nunezconstruction.co CGC057207 Engineering Systems Technology, Inc. 2400 W 84th Street, Unit 9 d4\1 Hialeah, R- 33016 (305) 823-7444 (305) 823-0553 To: Nunez Contruction From: Abraham Martinez abraham@estfl.com Quotation Quote* DCV-1 NF7 Sep 30th 2020 Gateway Park Turnstile Open Signal Relay Part Number Quantity Description 1. SIGA-CR 1 Control IAelay Module. Select for either N.O. or N.C. operation. Rated at 2 amps (24Vdc) 2. EST -LABOR I Labor performed ty EST technician: Subtotal: $505.73 Tax $35.40 Total: $5®1.13 Customer Approval: Date: FO Number. Name/Title: TermS: 1 Installation and programming of a new control relay in the IT Room In order to provide can open signal to the Turnstile upon fire alarm activation. EST Approval: Name/Title: Deb& Quote is not valid until approved by ES.T. personnel. Page 1 of 1 I & G Power Inc. 1950 SW 123 Ct Miami R 33175 Phone# 305-798-2157 f9alan64@9mai Icom Fax# 305-220-5517 IShip To NUNEZ CONSTRUCTION CARLOS NUNEZ 64005W62 AVE SOUTH MIAMI FL:33143, FL Roof Level 1- Provide conduit and water proof boxes for 3 Pull station 2- Provide conduit and water proof boxes for 3 speakers/strobe Labor 3 Electrician $ 46.73 Material 1- Water proof boxes for Fire Alarm 2- Approximate 6.000 ft of 3/4 EMT Conduits 3- Compression Steel Coupling and Connectors for Exterior parking area 4- One hole straps 5- Regular electrical boxes for interior of building 6- Additional miscellanies _ Estimate 10/19/2020 201850 I Project: 6400 SW62AVE NHANH, FL 33143 Gate Way Building Fire Alarm 20,587.00 16,796.80 Overhead 5% 1,869.19 Profit 7% 2,747.70 Accepted: 5ignature:_____ Date: Page 2 Total $42,000.69 n)� Engineering Systems Technology, Inc. Quotation 2400 W 84th Street, Unit 9 Quote #. RRB-NNXK Hialeah, R- 33016 Oct 12th 2020 MI -(305) 823-7444 NWOOf (305) 823-0553 Gateway Park Fire Alarm Upgrade Part Number Quantity Description 20. EST-PROG 1 Labor perfomled by EST technician to program fire alarm system and/or devices. 21. EST-INSP-ROUGH- 1 Electrical rougll inspection with the city. E 22. EST-INSP-FINAL-F 1 Flre Alarm final Inspection with the city. 23. EST-INSP-FINALE 1 Eletrical Fire Final with the city Subtotal: $29,752.45 Tax $2,082.67 Page 2 of 3