Loading...
HomeMy WebLinkAboutReso 2021-3154RESOLUTION NO. 2021 - 'j) . A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA; RATIFYING CHANGE ORDER NO. 1 TO THE AGREEMENT WITH ALL WEBBS ENTERPRISES, INC. FOR PURCHASE AND INSTALLATION OF TWO (2) DRAINAGE WELLS AND CONCRETE PADS, IN AN AMOUNT NOT TO EXCEED THIRTEEN THOUSAND TWO HUNDRED FIFTY DOLLARS ($13,250.00); AUTHORIZING THE CITY MANAGER TO DO ALL THINGS NECESSARY TO EFFECTUATE THIS RESOLUTION; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, on February 20th, 2020, via Resolution No. 2020-3047, the City Commission approved an Agreement with All Webbs Enterprises, Inc. ("Contractor") to furnish and install drainage wells and concrete pads along 172nd Street ("Services"), in an amount not to exceed $65,450; and WHEREAS, the Contractor submitted Change Order No. 1 for additional work to be performed on an emergency basis, attached here to as Exhibit "A"; and WHEREAS, the City Manager has determined that the additional services were not included in the original scope of work; and WHEREAS, the City Commission now wishes to ratify Change Order No. 1 to the Agreement with All Webbs Enterprises, Inc. for additional services related to the purchase and installation of drainage wells and concrete pads, in an amount not to exceed Thirteen Thousand Two Hundred Fifty Dollars ($13,250.00), bringing the total contract amount not to exceed Seventy -Eight Thousand Seven Hundred Dollars ($78,700.00), attached hereto as Exhibit "A". NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, AS FOLLOWS: Section 1. Ratification of Change Order No. 1. The City Commission hereby ratifies Change Order No. 1 to the Agreement with All Webbs Enterprises, Inc. for the purchase and installation of two (2) drainage wells and concrete pads along 172nd Street, in an amount not to exceed Thirteen Thousand Two Hundred Fifty Dollars ($13,250.00), bringing the total contract amount not to exceed Seventy -Eight Thousand Seven Hundred Dollars ($78,700.00), attached hereto as Exhibit "A„ Section 2. Authorization of City Manager. The City Manager is hereby authorized to do all things necessary to effectuate this Resolution. Section 3. Effective Date. This Resolution will become effective upon adoption by the City Commission. PASSED AND ADOPTED this 21St day of Ja 2021. Georg H. Scholl, Mayor R2021 COl w All Webbs for Purchase of Wells APPROVED AS TO FORM AND L A SUFFICIENCY: ward A. Dion, City Attorney Vote: Mayor Scholl Vice Mayor Svechin Commissioner Goldman Commissioner Lama Commissioner Viscarra R2021 C01 w All Webbs for Purchase of Wells V (Yes) (No) (Yes) (No) (Yes) (No) VI(Yes) (No) V (Yes) (No) Coversheet S,tot 14Y,S,F City of Sunny Isles Beach O� l@ n 18070 Collins Avenue .��Sunny Isles Beach, Florida 33160 s - (305) 947-0606 City Hall (305) 949-3113 Fax rr Ji SVN F W:[N[* TJ►13111Ji TO: The Honorable Mayor and City Commission VIA: Christopher J. Russo, City Manager FROM: Richard Labinsky, P.E., City Engineer DATE: 1/21/2021 Resolution Approving Ratifying the Agreement with All RE: Webb's Enterprises, Inc. for the 172nd Street Drainage Improvements RECOMMENDATION: Staff is recommending the City Commission approve the attached Resolution. REASONS: The City of Sunny Isles Beach wishes to ratify the Agreement with All Webbs Enterprises, Inc. for additional services with the 172nd Street drainage improvements. These additional services were an urgent safety matter and were resolved expeditiously. The contractor needed to drill deeper than originally quoted and the covers needed to be custom from what was originally quoted via Resolution #2020-3047. If the vendor were to wait for the approval of the City Commission, this would have delayed the completion and left the area as an unsafe, construction site. This site is heavily traversed by both vehicular and pedestrian traffic. The additional services include: to furnish and install 2 - 48"x 48" vault hatches on top of modified drainage structure, pedestrian rated 300lbs/SQ-FT 2 @$3,750 each, furnish and install 1" steel plates and aluminum baffles in drainage structure 2@$2,850 each, and additional drilling $6,000. This is a total of $19,200.00. However, the total amount to close-out the purchase order is an amount not to exceed $13,250.00. Total amount not to exceed $13,250.00 FUNDING SOURCE: Funds have been appropriated in account no. 300-5-5410-465000- 82002. ATTACHMENTS: Description Resolution Chance Order No. 1 Quote Page 1 of 1 Item Number: 10.A. https:Hsunnyisles. novusagenda. com/agendapublic//Coversheet. aspx?ItemID=28 80&Meetin... 2/2/2021 SVNNy 'S4 1P Q _ Y � n r O P P FLOC\ S� C/r� OF SUN PCO CITY OF SUNNY ISLES BEACH CHANGE ORDER CHANGE ORDER NUMBER: 1 DATE: January 21, 2020 NET TOTAL DOLLAR VALUE OF ALL PREVIOUS CHANGE ORDERS: PROJECT: ITB NUMBER: 18-04-01 $13,250.00 CREDIT / DIRECT PURCHASES: 172 Drainage Improvements RESOLUTION NUMBER: 2020-3047 ORIGINAL DOLLAR CONTRACT AMOUNT: $65,450.00 NET TOTAL DOLLAR VALUE OF ALL PREVIOUS CHANGE ORDERS: $0 DOLLAR AMOUNT OF THIS CHANGE ORDER: $13,250.00 CREDIT / DIRECT PURCHASES: $0 NEW DOLLAR CONTRACT AMOUNT: 1 $78,700.00 ORIGINAL CONTRACT COMPLETION DATE June 10, 2020 TOTAL OF PREVIOUS CHANGE ORDER DAYS: 0 AMOUNT OF DAYS PER THIS CHANGE ORDER: 0 NEW CONTRACT COMPLETION DATE: 0 DESCRIPTION OF SCOPE OR WORK CHANGES: I) Furnish and install 2 - 48"x 48" vault hatches on top of modified drainage structure, pedestrian rated 300lbs/SQ-FT 2 @$3,750 each 2) Furnish and install 1" Steel plates and aluminum baffles in drainage structure 2@$2,850 each 3) Additional drilling$6,000 Total - $19,200.00 includes all labor and materials. NOTE; Unless specifically stated clearly elsewhere on this page, this contract amendment does NOT include an extension of time or grant any additional general conditions amounts. The City and the Contractor agree that the contract time adjustment and sum agreed to in this document constitute a full and complete settlement of the matters set forth herein, including all direct and indirect costs for equipment, manpower, materials, overhead, profit and delay relating to the Issues set forth in this document. CONTRACTOR David W. Webb CITY ATTORNEY: Edward Dion PROJECT MANAGER: Rick Labinsky CITY MANAGER: Christopher J. Russo rAli) ALL WEBBS PROPOSAL CHANGE ORDER To CITY OF SUNNY ISLES BEACH ATTN: RICHARD LABINSKY Amended Agreement — Purchase Orders as Follows: Order # I Date Project City of Sunny Isles 172nd Drainage Improvement RFC # Value Notes CO#1 $19,200 PLEASE SEE BELOW FOR DESCRIPTION We hereby submit specifications and estimates for: 1) FURNISH AND INSTALL 2 - =48"X48" VAULT HATCHES ON TOP OF MODIFIED DRAINAGE STRUCTURE, PEDESTRIAN RATED 300LBS/SQ-FT 2 (@$3,750 EACH 2) FURNISH AND INSTALL 1" STEEL PLATES AND ALUMINUM BAFFLES IN DRAINAGE STRUCTURE 2@$2,80 EA 3) ADDITIONAL DRILLING $6,000 [TOTAL-; $19,200 PRICE INCLUDES ALL LABOR & 1VIATERIALS Original Contract Amount $59,500.00 Previously Approved Change Orders $0.00 Previous Contract Amount $59,500.00 Amount This Change Order $19,200.00 Revised Total Amount $78,700.00 Please sign & return for our records. (Authorized signature) (Authorized signature — title)