Link Construction Group
B. PROJECT SCHEDULE II Gateway Pedestrian Bridge LOYI -twN iarchitects Sunny Isle, Florida ' congtructfon group ID Task Name Duration 'Start Finish I Julv Se tember November Janua March MaV Jul M ( B E M B E M B E M B E M B E M B E M B 0 Gateway Park Preliminary Bid Schedule 249 days Thu 7/17/14 Tue 6/30/15 1 2 City Commission Award 1 day Thu 7/17/14 Thu 7/17/14 3 Issue N.T.P 1 day Fri 8/1/14 Fri 8/1/14 4 Survey 5 days Mon 8/4/14 Fri 8/8/14 5 Geotechnical Investigation/ Report 5 days Mon 8/4/14 Fri 8/8/14 6 Design & Preparation of Permit Drawings 75 days Mon 8/11/14 Fri 11/21/14 7 Owner's Review/ Approval of Final Design 5 days Mon 11/24/14 Fri 11/28/14 8 Submit Drawings for Bldg. Dept. Approval 1 day Mon 12/1/14 Mon 12/1/14 9 Review/ Approval by Bldg. Dept. 30 days Tue 12/2/14 Mon 1/12/15 10 Permit Approval & Issuance 1 day Tue 1/13/15 Tue 1/13/15 11 Preparation of Shop Drawings Submittals 20 days Mon 12/1/14 Fri 12/26/14 12 Review/ Approval of Shop Drwgs by A/E 10 days Mon 12/29/14 Fri 1/9/15 — 13 Submission of Shop Drwgs to Bldg Dept 1 day Wed 1/14/15 Wed 1/14/15 14 Review/ Approval of Shop Drgs by Bldg Dept 10 days Thu 1/15/15 Wed 1/28/15 15 Preparation of MOT Plans 10 days Wed 12/31/14Tue 1/13/15 16 Submission of MOT plans to City/ County 1 day Wed 1/14/15 Wed 1/14/15 17 Review & Approval of MOT by County 10 days Thu 1/15/15 Wed 1/28/15 18 Release Shop Drgs for fabrication 1 day Mon 1/12/15 Mon 1/12/15 i 19 Fabrication of Steel Bridge & associated items 57 days Tue 1/13/15 Wed 4/1/15 20 Fabrication of Elevators 36 days Tue 1/13/15 Tue 3/3/15 21 Material Procurement 7 days Tue 1/13/15 Wed 1/21/15 22 Procurement of Light Fixtures & Electrical Items 30 days Tue 1/13/15 Mon 2/23/15 23 Construction 120 days Wed 1/14/15 Tue 6/30/15 24 Mobilization 5 days Wed 1/14/15 Tue 1/20/15 25 Install Erosion Control Measures 5 days Wed 1/21/15 Tue 1/27/15 26 MOT set up / placement 5 days Thu 1/29/15 Wed 2/4/15 27 Site work/ Utilities 15 days Thu 2/5/15 Wed 2/25/15 28 Underground Rough Electrical 10 days Thu 2/26/15 Wed 3/11/15 29 Construction of new Elevator Towers 30 days Thu 3/12/15 Wed 4/22/15 30 Rough Electrical above ground 10 days Thu 4/23/15 Wed 5/6/15 31 Installation of Bridge Structural Members 15 days Thu 4/23/15 Wed 5/13/15 32 Install Framing and perforated panels 25 days Thu 5/7/15 Wed 6/10/15 33 Concrete pour over Metal Deck 2 days Thu 5/14/15 Fri 5/15/15 34 Installation of Elevators 15 days Thu 5/14/15 Wed 6/3/15 35 Installation of Chain Link Fence/ Railings 5 days Thu 5/14/15 Wed 5/20/15 36 Installation of Decorative Panels 5 days Thu 5/21/15 Wed 5/27/15 37 Finish Electrical 5 days Thu 5/21/15 Wed 5/27/15 38 Landscaping 8 days Thu 5/21/15 Mon 6/1/15 39 Painting & Finishes 10 days Thu 6/11/15 Wed 6/24/15 40 Final Inspections 3 days Thu 6/25/15 Mon 6/29/15 I 41 Substantial Completion 1 day Tue 6/30/15 Tue 6/30/15 Tue 6/24/14 Page 1 Page 5 EXIST. PUBLIC _ STORAGE BLDG. I I i I PEDESTRIAN I I BRIDGEABOVE I I I I SUNNY ISLES BEACH BLVD. I I N.E. 163 ST. (WEST BOUND) I I SOUTH ELEVATOR I I — I i TOWER WWW '.. t Fur's r J4 G� I ® ® I I I ® ® > I ® ® -- -- ------------------- GATEWAY PARK --------- I - - - I I ® ED CJ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ SUNNY ISLES BEACH BLVD. N.E. 163 ST. (EAST BOUND) ❑ ❑ ❑ ❑ ❑ ❑ _ ❑ ❑ ❑ ❑ ❑ ❑ Page 15 0 ❑ ❑ �o o� E] N QCONTEXTUAL SITE PLAN scnLe riTs FUTURE ST. TROPEZ OFFICE BUILDING EXIST. PUBLIC STORAGE BLDG. O F- PARTIAL ROAD LANE CLOSURE DURING STEEL BRIDGE INSTALLATION PEDESTRIAN T 1 BRIDGE ABOVE I I I I I I I I I SOUTH ELEVATOR I I TOWER I I llin II -I c W SUNNY ISLES BEACH BLVD. N.E. 163 ST. (WEST BOUND) 0Ll ❑❑ r- t - - -j- j - - -- i j Ell D i i i ® ® - -- ---- - - - - - GATEWAY PARK - -- I — r — I I I ® ® j C7 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ SUNNY ISLES BEACH BLVD, N.E. 163 ST. (EAST BOUND) ❑ ❑ ❑ ❑ ❑ ❑ _ ❑ ❑ ❑ ❑ ❑ PRELIMINARY MOT PLAN - PARTIAL ROAD CLOSURE Page 17 C LE-1 :wi4 wr 1 M r, 0 N isCONTEXTUAL SITE PLAN SCALE: NTS FUTURE ST. TROPEZ OFFICE BUILDING Ennorru"inn group L EXIST. PUBLIC STORAGE BLDG. Wommii NORTH ELEVATOR TOWER L— SIDEWALK CLOSURE DURING NORTH SIDE PHASE OF CONSTRUCTION PEDESTRIAN RRIDGEABOVE CLOSURE SUNNY ISLES BEACH BLVD. SIDEWALK SOUTH ELEVAT TOWER _ I Iliiil��lii•iriiiliilii� I ® ® i 0 SUNNY ISLES BEACH BLVD. N.E. 163 ST. (EAST BOUND) PRELIMINARY MOT PLAN - SIDEWALK CLOSURE Page 18 ra UV Mr I 00 (I N CONTEXTUAL SITE PLAN SCALE: MS FUTURS ST.TRGPEZ OFFICE ULIDING con!struction'. rou i - - -- - - - - - -a E:3 JE::� E:3 E::3 E:3 - - - - - - - - - - - - 4-4 ® GATEWAY PARK _ - _- _- __- _- .- _ -_ -_ -_ - - - - — I I ® ® i 0 SUNNY ISLES BEACH BLVD. N.E. 163 ST. (EAST BOUND) PRELIMINARY MOT PLAN - SIDEWALK CLOSURE Page 18 ra UV Mr I 00 (I N CONTEXTUAL SITE PLAN SCALE: MS FUTURS ST.TRGPEZ OFFICE ULIDING con!struction'. rou NEW PLANTERS (TO BE SELECTED) NORTH ELEVATOR TOWER QCt)C'JC� WWWW Q EXISTING TREES TO REMAIN C:j Q EXISTING TREES TO REMAIN SOD SOD p I I I I PEDESTRIAN I BRIDGE ABOVE I I 1 1 SUNNY ISLES BEACH BLVD. I I N.E. 163 ST. (WEST BOUND) I 1 SOUTH ELEVATOR L ( I I 1 TOWER I I TITTT EXIST. PUBLIC _ STORAGE BLDG. � � will NEW TREES (TO BE SELECTED) WON// a %/// /// Il IIV I _ T FUTURE ST. TROPEZ - - -rte -quo -I ■ ■� El E] ❑❑ r---- r----- rt - - - -i I -- I ® ® I I i I ® © -- -------- ---- GATEWAY PARK -------- --- i ® ® > I I ® ® j ❑ ❑ ❑ ❑ ❑ ❑ ❑ a ❑ ❑ ❑ ❑ SUNNY ISLES BEACH BLVD. N.E. 163 ST. (EAST BOUND) ❑ ❑ ❑ ❑ e ❑ ❑ ❑ ❑ ❑ PRELIMINARY CONCEPTUAL LANDSCAPE PLAN Page 19 L. SRI 1601 in Iffils a, Iwi � i ■ y N isCONTEXTUAL SITE PLAN SCALE: NTS J FUTURE ST. TROPEZ OFFICE BUILDING