HomeMy WebLinkAboutCPZ Architects Submittal RFQ 21-10-01 11-29-2021City of Sunny Isles Beach Space Needs Assessment and Site Feasibility Study RFQ #21-10-01 November 30, 2021 CPZ Architects, Inc. 4316 West Broward Boulevard, Plantation, Florida 33317 1601 Belvedere Rd., S-350, West Palm Beach, 33406 200 N. El Mar Drive, Suite 201, Jensen Beach, Florida 33317 Chris P. Zimmerman, AIA (954) 792-8525 Chris@cpzarchitects.com “I want to personally thank you and your team. People cannot get enough of how beautiful the building is. Your design was well thought out. Not only is it beautiful but it is functional. Two very important qualities. I truly appreciate your hard work and passion.” Barbara Hernandez the Parks and Recreation Director for the City of Doral SECTION 1 Doral Glades Park C P Z TITLE PAGE CPZ ARCHITECTS, INC. 4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317 1601 BELVEDERE RD., S-350, WEST PALM BEACH, FL 33406 200 N. EL MAR DRIVE, SUITE 201B, JENSEN BEACH, FLORIDA 34957 (954) 792-8525 AA# 26000685 WWW.CPZARCHITECTS. COM City of Sunny Isles Beach Space Needs Assessment and Site Feasibility Study RFQ #21-10-01 November 30, 2021 “I want to personally thank you and your team. People cannot get enough of how beautiful the building is. Your design was well thought out. Not only is it beautiful but it is functional. Two very important qualities. I truly appreciate your hard work and passion.” Barbara Hernandez the Parks and Recreation Director for the City of Doral SECTION 2 Doral Glades Park C P Z TABLE OF CONTENTS CPZ ARCHITECTS, INC. 4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317 1601 BELVEDERE RD., S-350, WEST PALM BEACH, FL 33406 200 N. EL MAR DRIVE, SUITE 201B, JENSEN BEACH, FLORIDA 34957 (954) 792-8525 AA# 26000685 WWW.CPZARCHITECTS. COM Section 1 Title Page Section 2 Table of Contents Section 3 Cover Letter & Executive Summary Current Workload Key Personnel MWDBE or meeting of procurement goals Section 4 Project Approach & Understanding Section 5 Qualifications & Assigned Personnel Financial Stability Awards, Training, Recommendations Licenses SF 330’s Part I and Part II Organizational Chart Section 6 References SF 330’s Section E Resumes SF 330’s Section F Projects Section 7 Certificate of Good Standing Section 8 Forms and Attachments Required Forms COI Fire Station #80 “I have worked for the City of Coral Springs for 28 years and have to say that CPZ is one of the best firms the City has ever hired.” Chief Curan SECTION 3 Moffatt & Nichol, Inc. We (or personnel now at Moffatt & Nichol) provided structural engineering consultation and design services for the renovations and upgrades to the city of Coral Springs Public safety complex. Following a comprehensive site assessment and audit of record construction documents, the existing police department building structure was modeled and analyzed for resident load capacity. We coordinated the space planning and configurations with the user and the architect to optimize strengthening for occupancy changes within the existing envelope. The programming also included infill floors within the existing building volume and a vertical addition to create space for an Emergency Operation Center. As such the entire building structure comprised of existing components and addition was hardened to achieve Building Code compliance for risk category 4 facilities. Moffatt & Nichol offers clients a professional and experienced support staff of more than 850 planning and design‐ related professionals and support personnel, who specialize in structural, civil, coastal, mechanical, and electrical and construction engineering disciplines. The company is a private corporation and maintains a thirteen‐member board of directors, with key practice leaders and operational managers who provide overall leadership for the company. Most of these are working professionals with long and distinguished careers in engineering in the coastal environment. The firm has been established in Florida since 1994, and currently has seven offices throughout the state. For our municipal clients, Moffatt & Nichol has acted as an extension of their staff to provide professional consulting services on a variety of projects. We have attended commission and council meetings on short notice, developed presentations for public workshops, and maintained web‐based project management systems to facilitate project communication with municipal staff. Moffatt & Nichol has also prepared construction plans and specifications, as well as a contract documents, for a number of projects in Florida, and has assisted municipalities in the competitive bidding process. The firm also provides construction administration services to make certain the projects are completed in accordance with the contract documents as well as the environmental permits. 100 W. Cypress Creek Rd., Ste. 960 Fort Lauderdale, FL 33309 p 954.622.8100 www.moffattnichol.com November 23, 2021 City of Sunny Isles Beach Attn: City Clerk Sunny Isles Beach Government Center 18070 Collins Avenue, 4th Floor Sunny Isles Beach, Florida 33160 RE: RFQ No. 21-10-01 Space Needs Assessment and Site Feasibility Study (CCNA) Request for Qualification Dear City Clerk & Members of the Selection Committee: OCI Associates, Inc. (OCI) is pleased to present our qualifications for your consideration as a sub-consultant to CPZ Architects for this contract. We are a 34 year-old, full-service engineering design firm, providing mechanical, electrical, plumbing, fire protection, IT/ AV systems engineering design, commissioning, and construction administration services. OCI is headquartered in the Orlando area with 10 branch offices throughout the United States. Our Principal and Electrical Engineer of Record, Sudharma Wijegunawardana, PE, LEED AP, LC will be your primary point of contact for all MEP/FP/IT/AV engineering for this contract. OCI has been providing assessments and building condition studies to more than 73 different public sector clients for over 20 years including cities, counties, school districts and higher education instuitions. The government agencies listed below are our current Continuing Service Contracts where we perform due diligence reports on MEP/FP/ITS systems: · St. Lucie County · Osceola County · Manatee County · Volusia County · Lee County · City of Palm Beach Gardens · San Francisco Airport Commission · Moffitt Cancer Center · FL Department of Management Services · U.S. State Department · National Institute of Standards & Technology · U.S. General Services Administration · U.S. Bureau of Prisons · U.S. Army Corp of Engineers · Social Security Administration Of particular interest, recent building condition assessments that we have completed include: · Okeechobee County Facilities UV Report · Okeechobee County HVAC Feasibility Report · West Palm Beach Court Building Renovation Analysis · Town of Jupiter Community Center Due Diligence Report · Palm Beach County DramaWorks Theater Feasibility Study · Palm Beach Sheriff’s Office HQ Annex Assessment · Osceola County Command Center MEP System Study · FHP Troop D HQ Roof Replacement Feasibility Study · FHP Orlando I-Drive Facility Assessment & Report · HMA HQ Assessment & Feasibility Report · US GSA Courthouse Feasibility Study · SSA Short Circuit & Feasibility Study · SSA Generator Exhaust Stack Feasibility Study · SSA AHU Reconditioning Feasibility Study · South Bay Correctional Plumbing Investigation & Feasibility · Volusia County Transfer Station Feasibility Study · Osceola County Publix Feasibility Study · San Francisco International Airport GBAS Feasibility Study Since 2000, our team has worked on more than 500 projects where we had to provide an assessment of the existing conditions of the MEP systems and/or equipment in an effort to renovate, expand or retrofit an existing building. We have been fortunate to work with both federal agencies on unique studies and local government agencies, giving our team hands on knowledge in highly secure buildings. We feel confident in our ability to support CPZ Architects and the City of Sunny Isles Beach should we be selected and we are willing to meet any location, budget or tasks or required of this contract. Respectfully, Amir Kazeminia, PE President + CEO REPRESENTATION OF THE FIRM Amir Kazeminia, PE, President + CEO 600 S. Orlando Avenue Maitland, Florida, 32751 407.332.5110 CURRENT WORKLOAD & IMPACT See the chart below for our key team member’s current and projected workloads for the next 6 months. We have: · 2 assessments being performed · 3 projects pending start · 7 projects in design · 1 project under construction. Given our current and projected workload, we find ourselves ready and able to take on your City's Space Needs Assessment and Feasibility Study. OCI is fully staffed with 70 people throughout our 11 offices; OCI has the resources to pull from our Headquarters and other branch offices should additional work arise. OCI ASSOCIATES WORKLOAD PROJECT NAME STATUS Village of Palm Springs Police Building Due Diligence Report Ongoing St. Lucie County Library Branch Assessment Ongoing OCPS Andover ES Capital Renewal Awaiting Start City of St. Cloud City Hall Roof & HVAC Renovation Awaiting Start HCPS Tampa Bay Blvd ES Capital Renewal Awaiting Start Debary City Hall HVAC Upgrades 50% DD’s City of Hollywood Police Headquarters 90% CD's Broward County Supervisor of Elections 100% DD’s Casselberry Public Safety Facility 100% DD’s Pasco County Detention Center Expansion 100% DD’s City of Jupiter City Hall 100% DD’s DMA West Palm Beach District Court of Appeal 100% DD’s Palm Beach County Supervisor of Elections Permit Submitted Okeechobee Sheriff’s Jail Renovation & Expansion Bid Set Submitted DMS Peterson Building OAU Replacement Construction "OCI is fully staffed with 70 people throughout our 11 offices; OCI has the resources to pull from our Headquarters and other branch offices should additional work arise". CERTIFIED MINORITY FIRM OCI Associates, Inc. does not qualify as a certified minority business. However, we are a diverse company consisting of 24% women employees and 32% minority employees. In addition, 35% M/WBE make up our Principal leadership. We are a true definition of a company melting pot. Our firm is made of employees who’s heritage stems from Peru, Venezuela, Ecuador, Honduras, Puerto Rico, Colombia, Jamaica, Haiti, Egypt, Sri Lanka, Greece, the Middle East, in addition to India, Asia and New Zealand. OCI is a 74-person firm that supports diversity in the workplace. MINORITY BUSINESS ACT Depending on the nature of a particular project as well as any specified trades or teaming requirements, OCI has teamed previously with local firms. We have supported many programs such as the Minority Business Enterprise (MBE), Women Business Enterprise (WBE), Local Developing Business (LDB) and Service Disabled Veteran Owned Small Business (SDVOSB) where this is required by the client. We typically will work with small, local businesses and partner with structural, civil, architectural, geotechnical, and cost estimating firms where we anticipate needing these additional services under contracts. 76% 24% OCI Gender Diversity Male Female 32% 68% OCI Minority Diversity Minority Non-Minority 64%7% 14% 14% OCI Leadership Diversity Male Non-Minority Female Non-Minority Male Minority Female Minority 64%7% 14% 14% OCI Leadership Diversity Male Non-Minority Female Non-Minority Male Minority Female Minority 64%7% 14% 14% OCI Leadership Diversity Male Non-Minority Female Non-Minority Male Minority Female Minority "35% of OCI's Leadership team is made up of women and minority employees". C P Z CURRENT & PROJECTED WORKLOAD CPZ ARCHITECTS, INC. 4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317 1601 BELVEDERE RD., S-350, WEST PALM BEACH, FL 33406 200 N. EL MAR DRIVE, SUITE 200, JENSEN BEACH, FLORIDA 34957 (954) 792-8525 AA# 26000685 WWW.CPZARCHITECTS. COM Recent, current, and projected workload of the firm Our current workload has projects at various levels of completion. As you review our workload summary below you will see several projects that are in the construction phase and nearing completion this year. This allows us to start shifting our resources over the next three months to add a new design project such as yours. Based on our work schedule, this is a perfect opportunity for our office. Our current workload will allow us to start immediately on your project. We would like the opportunity of meeting with you to discuss this further. If you have any questions and/or require additional information, please call. Martin County Fire Stations #14 & #18, Florida CPZ Architects completed construction documents for Martin County new Fire Stations #14 & #18. Fire Station 14 is located on Hutchinson Island and Fire Station 18 is in a Residential area in Martin County, Florida. The 12,389 sf. 1-story facility consists of 3 bays, 10 dormitories, gym, bunker gear room, quiet room, offices, scuba, shop, decon and a commercial grade kitchen. The same prototype station was used in two separate locations as a means of savings on Design and Construction costs for the County. Design of both new stations reflects the Key West style Architecture predominant in the adjacent residential neighborhoods at both locations. Phase: CA Cost: $5.1 million Completion: September 2022 Broward County West Regional Court House Phase II Renovation CPZ Provided Architectural Services for the phase II Renovations. This includes General design of the interior office spaces clerk of court Civil and Marriage. Prepared 100% construction document and specification. CPZ Architects is currently working with Broward County to renovate the clerk of the court offices and public spaces at the West Regional Courthouse in Plantation. We are improving traffic pattern and workflow of the space. The new layout addresses many of these issues by designing open office space that is easily accessible to all employees and providing each department with immediate access to support areas for better flow. Waiting areas have been expanded and enlarged for a better user experience. Phase: CD’s Completion: 2022 City of Coral Springs Fire Station #64 In 2005 CPZ Architect’s completed a renovation of Fire Station 64. The project involved the compete remodeling of the Fire Station to provide an up-to-date Fire Station and more importantly improve the functionality of the station. The design and construction documents were developed into a two-phase project, allowing the Fire Station to maintain its operation during the construction process. A temporary modular dormitory was installed on site to provide temporary living quarters during the construction process. In 2020 CPZ Architect’s was selected to design the new Fire Station. The project will require the demolition of the existing building. The project will include the design of a new, single story fire station of approximately 8,000 square feet and all site work. The structure may include 3 bays, 8 bunkrooms, 3 unisex bathrooms, an exercise room, 2 offices, alarm room, day room, commercial kitchen, dining area, storage space, laundry facilities, backup power (with redundant plug). The station is planned to be built approximately 1000 feet North of the current structure. Once the new structure is complete and operational the existing station is to be demolished and restored as part of the adjoining park (Kiwanis Park). CPZ Architects completed both Coral Springs new Fire Stations #43 & #95. The same prototype station was used in two separate locations as a means of savings on Design and Construction costs for the city. It is the City of Coral Springs intent to substantially match the design for the two before mentioned stations. Phase: Permit Scheduled Construction Completion: December 2022 C P Z CURRENT & PROJECTED WORKLOAD CPZ ARCHITECTS, INC. 4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317 1601 BELVEDERE RD., S-350, WEST PALM BEACH, FL 33406 200 N. EL MAR DRIVE, SUITE 200, JENSEN BEACH, FLORIDA 34957 (954) 792-8525 AA# 26000685 WWW.CPZARCHITECTS. COM Westside Maintenance Facility Master Plan, Coral Springs, Florida CPZ Architects was retained to redesign the existing Westside Complex for the City of Coral Springs to be developed in phases to an overall campus master plan. site. Phase: Construction Administration Cost: $25 million Completed: April 2022 Projected Workload: Flamingo Gardens Welcome Center, Davie, Florida CPZ provided design services for the Welcome Center at the Flamingo Gardens, a botanical garden and bird sanctuary park in Davie, Florida. The facility will include a Visitors Center, gift shop, restaurant, multi-purpose rooms, and administrative offices and supporting spaces. Site improvements include new parking, site lighting and landscape upgrades. Phase: Construction Administration Scheduled Completion: 2023 CPZ Architects, Inc. was selected to provide design, permitting, planning, engineering and construction administration services for a new facility to consolidate Port Facilities Maintenance and Operations from the current functions that are located within various buildings throughout the Port Everglades campus into a central location. The Project is intended to take place in three phases. The first phase will be the programming phase. The second phase will be the design and preparation of construction documents and permitting phase. The third phase will be the construction of the facility. Phase: Contract Negotiations Scheduled Completion: 2023 C P Z TEAM KEY PERSONNEL CPZ ARCHITECTS, INC. 4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317 1601 BELVEDERE RD., S-350, WEST PALM BEACH, FL 33406 200 N. EL MAR DRIVE, SUITE 201B, JENSEN BEACH, FLORIDA 34957 (954) 792-8525 AA# 26000685 WWW.CPZARCHITECTS. COM Your Project Principal and founding Principal, Chris P. Zimmerman, AIA has provided services to many local municipalities and counties in Florida. With over 38 years of experience, he has the passion and dedication to assure you will receive a quality project. Chris Zimmerman provided programming and feasibility studies on numerous municipal projects over his career. Chris will work personally with City Staff on all phases of this project as he has worked on the city side of his career. Chris has worked for the City of Fort Lauderdale and was a previous Council Member for the City of Plantation. Chris ‘s knowledge with working in the municipal government sector will bring a strong knowledge base for your project of programming and feasibility study. Chris’s client-focused commitment to project success – from precise documentation of measurable client goals and objectives, building code verification and project planning, to fully detailed construction documents, through final punch list – has earned him the reputation as a quality architect in the Florida community. To his design work, Chris also brings in-depth constructability knowledge and application to projects through his certification as a general contractor, a faculty that assures his clients that his designs have been developed to be economically buildable. Jayson Hall has served as Senior Project Manager on many of CPZ Architects’ most significant projects. He brings to his management role the commitment to not only meet, but anticipate and exceed, his client’s needs. Jayson is very knowledgeable for the Sunny Isles Beach Needs Assessment and will be valued asset to the project. Jayson’s record of meeting client goals for on time, in budget performance, combined with responsive aesthetic and functional design solutions, has resulted in valued long-term relationships with both public and private sector clients. As project manager, Jayson performs initial concept design, site planning, develops construction documents, construction administration and final project close-out. His capabilities in all aspects of architectural design include the creation of project concepts to detailing and coordinating construction documents. Jayson’s skill in the project’s construction phase ensures timely response to contractor queries, resolution of any issues, and completion of the facility in accordance with the plans and specifications. Jayson’s project experience includes both new construction and existing facility renovations, as well as tenant interior improvements and building upgrades. Nikolas Marchan joined CPZ Architects as an Associate Level III Architect. His main responsibilities are to provide architectural services ranging from preliminary design through construction administration for multiple projects at one time. Nikolas manages all phases of a project from site plan approval through construction administration. Nikolas serves as Project Manager on key CPZ Architects projects. He brings to his management role the commitment to not only meet, but anticipate and exceed, his client’s needs. Nikolas’s record of meeting client goals for on time, in budget performance, combined with responsive aesthetic and functional design solutions, has resulted in valued long-term relationships with both public and private sector clients. As project manager, Nikolas performs initial concept design, site planning, develops construction documents, construction administration and final project close-out. His capabilities in all aspects of architectural design include the creation of project concepts to detailing and coordinating construction documents. His experiences range from multi-million-dollar dealerships to retail and high -rise residential projects. His diverse portfolio includes a pier extension in St. John’s Antigua, the Crandon Tennis Stadium in Key Biscayne, Cruise Ship Terminal 2 in Galveston Texas, Gunther Mazda car dealership in Fort Lauderdale and University Town Center retail buildings in Sarasota, Florida. Our Structural Engineer is Moffatt & Nichol. Lawrence (Larry) DeRose has more than 40 years of marine, structural, and civil engineering consulting experience in South Florida with an emphasis on port, marine, structural, land development, and terminal projects, from planning to construction certification. Larry’s C P Z TEAM KEY PERSONNEL CPZ ARCHITECTS, INC. 4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317 1601 BELVEDERE RD., S-350, WEST PALM BEACH, FL 33406 200 N. EL MAR DRIVE, SUITE 201B, JENSEN BEACH, FLORIDA 34957 (954) 792-8525 AA# 26000685 WWW.CPZARCHITECTS. COM professional background includes all levels of experience in his areas of specialization, ranging from the most basic to management of complex projects, and in a broad variety of studies involving the practical applications of hydrology, hydraulics, fluid mechanics, and structural mechanics. He is experienced in all aspects of planning and directing studies that involve large- and small-scale site development for government planning programs, including feasibility, construction, and development. Larry as Owner of Derose Design Consultants worked with CPZ Architects Coral Springs Public Safety Complex, Coral Springs, FL. Principal-in- charge/structural engineer for the reconfiguration and structural hardening of an existing 60,000-square-foot safety complex, located on a 7-acre site, that includes a new LEED-certified fire station building, police station, two-story addition, and parking area. Services for the included structural, civil, mechanical, electrical, plumbing, fire protection, and life safety engineering, as well as energy modeling and commissioning. Ludovic Binner is a senior structural engineer with experience in structural design, wind frame analysis, calculations, special inspections, and construction administration for projects in the United States and France. He has worked on a variety of projects including multi-level hotels and resorts, educational facilities, community centers, sports arenas, park facilities, performing arts buildings, and marine facilities structures. Ludovic is experienced has experience as a project manager on both private and public sector work, leading intensive coordination between engineering disciplines, consultants, and clients. Our MEP Engineer is OCI Associates. Specific to this contract, the OCI team will be led by Sudharma Wijegunawardana, PE, LEED AP, LC who is and will be the Project Manager and the Electrical Engineer of Record. She will be supported by Jason Smith, PE, LEED AP BD+C who is a Certified Energy Manager and will be looking for ways to reduce energy costs as the Mechanical Engineer of Record. Sudharma will lead the teams’ efforts for complete design, specification, and construction administration of systems for heating- ventilating-and-air conditioning (HVAC); electrical systems including power, lighting, fire alarm, security, telecommunications, and information transport systems; plumbing systems including medical gases; and fire protection systems. Dan Jeffreys with CMS-Construction Management Services, Inc. (CMS) is comprised of a special blend of technical talents unique to both the Architectural/Engineering and General Contracting professions of today. Located in Broward County since its inception, CMS’s staff has been providing Construction (Project/Program) Management/Owners’ Representative and Cost Estimating/Cost Consulting services in the Tri-County area to both public and private sectors—including governmental agencies such as cities, counties, school districts, and airports throughout the state of Florida—and performing its services with an impeccable track record. For the past several years, CMS has been providing Cost Control/Estimating Services for a multitude of projects for the Fort Lauderdale / Hollywood International Airport’s expansion/modernization program. We, at CMS, consider our approach to Cost Control/Estimating to be of utmost importance in maintaining a project within the required budgetary constraints. Our multi-disciplined staff consists of individuals with years of experience and various degrees ranging from Construction Management, Civil Engineering, and Quantity Surveying to Business. Our experiences include, but are not limited to, the following services: 1) Construction (Project) Management/Owner’s Representative for large city/county projects; 2) Cost Estimating/Cost Control for a variety of municipal, county, and federal projects; 3) Value Engineering in reducing construction cost at various levels of design; 4) Constructability Reviews and Evaluations prior to solicitation of bids; 5) Feasibility Studies and Budget Development; 6) Contract Administration of multiple public and private projects; C P Z DIVERSITY STATEMENT CPZ ARCHITECTS, INC. 4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317 1601 BELVEDERE RD., S-350, WEST PALM BEACH, FL 33406 200 N. EL MAR DRIVE, SUITE 201B, JENSEN BEACH, FLORIDA 34957 (954) 792-8525 AA# 26000685 WWW.CPZARCHITECTS. COM CPZ strives to work with consultants that represent the diversity we value. We are proud to maintain consultants that represent both women and minority owned corporations and certified small businesses. It is further the policy of CPZ Architects, Inc. to encourage vendors, contractors, affiliating institutions, and others doing business with CPZ Architects, Inc., to observe the principles of Equal Employment Opportunity. CPZ Architects recognizes its talented and diverse workforce to building a lasting and successful architectural firm. Our business success reflects the quality and skill of our people. CPZ is committed to seeking out and retaining the finest human talent to ensure top business growth and performance. Diversity management benefits individuals, teams, our company as a whole, and our clients. We recognize that each team member brings their own unique capabilities, experiences, and characteristics to their work. As an organization, we value the contributions brought to us through these diverse perspectives. We believe in treating all people with respect and dignity; therefore, we strive to create and foster a supportive and understanding environment in which all individuals realize their maximum potential within the company, regardless of their differences. We also recognize the importance of reflecting the diversity of our clients and markets in our workforce. The varied capabilities that reside within our talented workforce, positions our team to anticipate and fulfill the needs of our diverse customers enabling us to develop the lasting client relationships for which we are known. Our team’s diversity encompasses d ifferences in ethnicity, gender, language, age, sexual orientation, religion, socio-economic status, physical ability, thinking styles, experience, and education. We believe that the wide array of perspectives that results from such diversity encourages innovation and business success. Managing diversity makes us more creative, flexible, productive, and competitive. CPZ Architects is a diverse architectural practice located in South Florida. We are a small firm of 14 with three licensed architects. Of these 14 employees, 7 are women, one is African American/Chinese, 8 are Hispanic American and one LGBQ. We do not discriminate based on ethnicity, gender, language, age, sexual orientation, religion, socio -economic status, or physical ability. Each employee is encouraged to advance within both the firm and the profession. Our firm offers flexibility in working time arrangements, open communications within our pleasant working environment, employee education assistance, employee networking and support groups as well as mentoring. All of this along with a zero-tolerance policy towards any form of prejudice earns us an enjoyable working atmosphere that promotes creativity through diversity. CPZ Architects, Inc. goal is to achieve and maintain equal employment opportunities. It is the responsibility of all to conform to the letter and the spirit of all applicable Civil Rights Laws. CPZ Architects, Inc. is an Equal Opportunity Employer and follows Title VII of the Civil Rights Act of 1964 as amended, Age Discrimination in Employment Act of 1967, and the Rehabilitation Act of 1973, and employs without regard to sex, race, color, national origin, religion, age, handicap or status as a disabled or Vietnam era veteran. Minority Business Certification CMS-Construction Management Services, Inc. 10/21/2019 10/21/2021 4. CERTIFIED MINORITY FIRM OCI Associates, Inc. does not qualify as a certified minority business. However, we are a diverse company consisting of 24% women employees and 32% minority employees. In addition, 35% make up our principal leadership. We are a true definition of a company melting pot. Our firm is made of employees who’s heritage stems from Peru, Venezuela, Ecuador, Honduras, Puerto Rico, Colombia, Jamaica, Haiti, Egypt, Sri Lanka, Greece, the Middle East, in addition to India, Asia and New Zealand. OCI is a 74-person firm that supports diversity in the workplace. 76% 24% OCI Gender Diversity Male Female 32% 68% OCI Minority Diversity Minority Non-Minority 64%7% 14% 14% OCI Leadership Diversity Male Non-Minority Female Non-Minority Male Minority Female Minority Lංඏංඇ඀ Wඈඋൽ Oඉൾඇ Bංൻඅൾ Cඁඎඋർඁ SECTION 4 C P Z PROJECT APPROACH & UNDERSTANDING CPZ ARCHITECTS, INC. 4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317 1601 BELVEDERE RD., S-350, WEST PALM BEACH, FL 33406 200 N. EL MAR DRIVE, SUITE 201B, JENSEN BEACH, FLORIDA 34957 (954) 792-8525 AA# 26000685 WWW.CPZARCHITECTS. COM Our Team approaches every project as an opportunity for success. Our goal is to provide a completed project that meets the needs of our client and the end user. We believe in working closely with you, the client, and our consultants to complete a thoroughly coordinated project. CPZ’s project approach is both systematic and progressive. As the Architect, we will be the designers of your building and overall site functions. The functionality of the facility, both site and building, will be our top priority. This shall be blended into an aesthetically pleasing design that you can be proud of in your City. Our staff includes LEED accredited professionals to assure that your new facility is sustainable, provides a quality indoor environment and is energy efficient. We are also experienced in other forms of certifications including Green Globes and Florida Green Building Coalition. We believe in working closely with you, the client, and our consultants to complete a thoroughly coordinated project. Our project method approach usually as follows: Programming The first part of this project is the programming and recommendations report. CPZ will issue a questionnaire for Staff to fill out prior to our first programming meeting. In this phase the design team will meet with staff to review all the project goals and gather all the analysis data. Then we will meet with all the departments concerned and determine the project specific needs, requests and budget for the entire project. These meetings are essential for the Design team and City staff to work together. During the programming phase we will meet on the site with our design consultants and provide a due diligence site report. This due diligence report includes all discipline reviews and code analysis, zoning requirements and City and County ordinances review. CPZ will also meet with Planning and Zoning during this phase to review the entire project for master planning and site plan approval process. We also request our clients to provide a survey and the geotechnical services during this phase. Once all programming requirements mentioned above are completed, the design team will issue a programming report. Once a facility program is developed, we will be able to identify the total building square footage as well as the parking and vehicle storage areas that will be required. This will allow us to start the review of available building/sites (Tracts A, B & C. As an example, we assisted the City of Coral Spring’s in the evaluation of an existing tilt wall warehouse that was for sale for use as a Public Works and Fire Administration Facility. We determined that the existing building was able to be utilized and had enough interior height for the vehicle lifts in one area and in the other areas allowed for a second floor to be installed within the existing structure. Based on the title wall nature of the building, we were also able to reinforce the structure so it could be utilized as an “Essential Facility” during emergencies. Conceptual Design Once the programming phase has been completed and with the scope in hand, we will develop a project milestone schedule and begin schematic design. During schematic design we request that the City’s Project Manager identify all City departments and users that will provide input on the project. CPZ will then set a kickoff meeting with all members of the City and all members of our design team. Several meetings will follow as the design evolves. As a starting point, our project manager will develop several preliminary master plan and floor plan options for review and then request a meeting with the City and selected staff for C P Z PROJECT APPROACH & UNDERSTANDING CPZ ARCHITECTS, INC. 4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317 1601 BELVEDERE RD., S-350, WEST PALM BEACH, FL 33406 200 N. EL MAR DRIVE, SUITE 201B, JENSEN BEACH, FLORIDA 34957 (954) 792-8525 AA# 26000685 WWW.CPZARCHITECTS. COM a Charrette type meeting where we spend a full half day to review their ideas and comments and develop the details of the master plan and floor plan options and all the specific requirements based on the programming report. Based on our feedback from meetings, we will make changes and submit the selected master plan and floor plan schematic drawing to our cost estimator to generate a schematic cost estimate for the project. As part of the schematic design phase of your project we will review all agency reviews and permitting that will be required and ADD them to the schedule. Project Management Plan Our comprehensive staff provides a wide variety of design and construction experience to assist the City in the successful completion of this project. You will have the same Senior Project Manager from the start of a project through the end of construction, also providing the continuity required for a successful project completion. Our Firm works with our clients to determine the project schedule at the start of the project to include the Design Phase, Permitting Submittals, and estimated construction phase. We then create an electronic schedule that can be maintained throughout the project. This schedule is reviewed at the completion of each phase of the project. If the project falls behind schedule, we determine what is required to bring the project back on schedule and make the necessary revisions. We have the ability to add additional people to the project, extend work hours or both if these methods will expedite the project. Based on the scope of work contained within the RFQ, we cannot assign hours to all the tasks now. However, we can inform you that we do have the staff available to work on your project immediately and continuously. Other scheduling solutions may include changing the sequence of activities to maintain the project moving to completion. On Time and In Budget Coral Springs Public Safety Complex Miami Gardens Community Center CPZ Architects was retained by the City of Miami Gardens by the recommendation of the City of Coral Springs, to take on the completion of the 60,000 SF Community Center, after the original architect was removed by the city. Project was under construction needing several items to be resolved and redesigned simultaneously, to avoid construction delays. CPZ Architects timely completion of the project resulted in the retention of our firm to complete an amphitheater on the Community Center complex. C P Z PROJECT APPROACH & UNDERSTANDING CPZ ARCHITECTS, INC. 4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317 1601 BELVEDERE RD., S-350, WEST PALM BEACH, FL 33406 200 N. EL MAR DRIVE, SUITE 201B, JENSEN BEACH, FLORIDA 34957 (954) 792-8525 AA# 26000685 WWW.CPZARCHITECTS. COM Cost Control Techniques Schedule Control – Our Firm works with our clients to determine the project schedule at the start of the project to include the Design Phase, Permitting Submittals, and estimated construction phase. We then create an electronic schedule that can be maintained throughout the project. This schedule is reviewed at the completion of each phase of the project. If the project falls behind schedule, we determine what is required to bring the project back on schedule and make the necessary revisions. We can add additional people to the project, extend work hours or both if these methods will expedite the project. Other scheduling solutions may include changing the sequence of activities to maintain the project moving to completion. (Your Project) Tract “A” 18,277 SQ FT Tract “B” 26,466 SQ FT Tract “C” 98,399 SQ FT Possible Conceptual Site Layout • New Construction • Parking Structure • Renovation Note: Possible Conceptual Layout shown is a conceptual diagram to show we understand scope based on RFP. PROJECT MANAGEMENT PLAN SCOPE OCI will conduct a thorough MEP/FP equipment and systems space analysis to demonstrate the current inadequacies and offer estimates of current and projected space requirements based upon industry standards, policing trends, and the City’s growth for all proposed locations. We will provide site evaluations and gathering of appropriate data on existing facilities and work with the City and CPZ Architects to determine if renovation, expansion, or new construction is possible at one of the property locations. OCI will provide a comparison of the life cycle for the renovation of an existing facility, acquisition of an adaptive re- use facility, or new construction. We will identify building costs and site requirements, including lot size recommendations, and required site elements, including but not limited to parking, security, lighting, access, visibility, etc. OCI will collaborate with City staff on policing philosophy, organizational hierarchy, current and future department goals, jurisdictional strategic plan, staffing projections, key personnel to be interviewed, space needs of agency by function, and any other information deemed appropriate to ensure an accurate analysis. We understand the existing facility’s layouts, building codes within jurisdiction and future policing trends and needs. OCI will assist CPZ Architects in obtaining public and community comments and/or information, as mutually agreed upon between the City of Sunny Isles Beach. METHOD OF APPROACH 1. Our Project Manager, Sudharma will create a spreadsheet with all the facilities listed with hours available and work with each manager of the building to set aside team for the OCI team to visit the site with minimal disruption. 2. OCI always keeps the schedule of your Facilities team and the access to each site/building in mind when determining the best time to conduct each investigation. 3. We take into consideration the hours of operations of the existing and occupied facilities and coordinate with the facilities' teams to gain access of proposed buildings and secured rooms. 4. To utilize the best means of everyone’s times, we will determine if multiple sites can be visited in one day and make a geographic map of the locations to optimize the best use of everyone’s schedule. 5. The next step in our process is to speak and meet with the maintenance team and pull any existing as-built drawings, maintenance reports, and issues log, so the team has a full picture of the existing condition of each building space before visiting the site. 6. As we compile information, photograph and document each site visit; information will be uploaded into a Cloud Server for all team members to utilize and store information to keep a collaborative approach to the building assessments. 7. Our team will meet on a regular basis to discuss and confer on items seen in an effort to keep everyone in the loop. 8. Our Project Manager will develop the Property Condition report with identified deficiencies to the The City with our teams recommendations for repair, replacement and ideas that may be necessary for the useful life remaining with budgets and anticipated time frames to maintain the existing spaces. 9. Any buildings or equipment that have immediate needs will be listed and prioritization giving. 10. Our team will work with you to create a preliminary budget, taking into account quality of materials, availability of equipment, manufacturers preferred with a long term goal and plan to get all the buildings up to code and standards. "A Collaborative approach to building assessments is uploading photographs and documenting each site to a Cloud Server for easy access to all team employees". Cඋඈඐඇ Cൾඇඍൾඋ Rൾඍൺංඅ SECTION 5 C P Z CPZ ARCHITECTS, INC. 4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317 1601 BELVEDERE RD., S-350, WEST PALM BEACH, FL 33406 200 N. EL MAR DRIVE, SUITE 201B, JENSEN BEACH, FLORIDA 34957 (954) 792-8525 AA# 26000685 WWW.CPZARCHITECTS. COM QUALIFICATIONS & EXPERIENCE CPZ has experience with a variety Projects in South Florida. CPZ Architects has experience with Municipal projects, Community Centers, Public Works Fleet Maintenance Buildings, both new and renovated and renovations of existing libraries, Facility Needs Assessments, Space Programming. The continued experience we have gained has provided us with an understanding of the Owner and the pride of Ownership for your own building and Image. We will provide a Space needs Assessment Report to ensure your building and City departments function well, has built in flexibility and present an image to both the public and your personnel that is warm and friendly and integrates into an existing built environment. As we review your project there will many challenges, however, with our past experience we will be able to resolve them smoothly. The most challenging may be building consensus among all the stake holders and city commission. We see our job as the firm that will provide clear and concise information about Assessment that can be easily understood by everyone. We have created a team of experts from that can respond and review every component and present the information in a comparable report. As stated in the Executive Summary our experience with Space Needs Assessment has given CPZ a unique understanding of the requirements for your Space Needs and Feasibility Study. CPZ will view your Facility not just as a building but a Campus complex that houses many different services and departments. Specific requirements such as different vehicle sizes and their need for service (in house or outside of the facility), coordination of multi-functional departments and their need to all work together in a efficient and functional capacity. The greatest testament to the quality of our service can be seen in our repeat Clients. Coral Springs has been utilizing CPZ Architect over the past 15 years in developing, implanting and expanding their Public Works Facility. Recently we worked with Coral Spring in determining the need to purchase an adjacent building and utilize it for more and better space. The review proved that this was a beneficial purchase. When presented to the City Commission is was unanimously approved. Similar to the work CPZ is doing with the City of Coral Springs, The City of Delray Beach Police Department hired CPZ to complete a needs and assessment study of their existing Police Department Facilities to determine if the existing building could be renovated or based on the results of the assessment report build a new Police Facility. CPZ Architects has completed a needs assessment of the Delray Beach Police Station outlining their current needs and providing an estimate of the future space needs for the next 10 years. A conceptual master plan was developed for two possible solutions to their space needs along with budgetary estimates. Option 1 included using the existing facility and expanding around the facility along with construction of parking garage. The second option was to construct a completely new multi-story facility on the back part of the site, while maintaining operation in the existing facility. Upon competition of the new facility, demolish the existing facility and construct the new parking garage. CPZ Architects has now been retained to provide a needs assessment for the City Hall and Community Center Site. C P Z CPZ ARCHITECTS, INC. 4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317 1601 BELVEDERE RD., S-350, WEST PALM BEACH, FL 33406 200 N. EL MAR DRIVE, SUITE 201B, JENSEN BEACH, FLORIDA 34957 (954) 792-8525 AA# 26000685 WWW.CPZARCHITECTS. COM QUALIFICATIONS & EXPERIENCE CPZ Architects, Inc. was selected to provide design, permitting, planning, engineering and construction administration services for a new facility to consolidate Port Everglades Facilities Maintenance and Operations from the current functions that are located within various buildings throughout the Port Everglades campus into a central location. The Project is intended to take place in three phases. The first phase was the programming phase. The second phase will be the design and preparation of construction documents and permitting phase. The third phase will be the construction of the facility. CPZ Architects provided full architectural design services for Glades Park which included a 9,000 sf Community Center. CPZ had the pleasure of working with the City of Doral on their brand new $10.5 million Glades Park & Nature Center Building project. The Nature Center’s tall glass walls were oriented to the North to maximize daylight use with less heat gain. Other architectural features include a large dedicated vaulted ceiling nature exhibit room, large, vaulted ceiling multipurpose room with moveable wall partitions., catering room, science lab classroom for children, e-library, vaulted ceiling lobby area, projection room, remotely controlled lighting and VRF air conditioning systems and outdoor Amphitheatre with its stage edging the 12-acre Lake. Doral Glades Park took Honorable Mention at the 2019 Fort Lauderdale Chapter American Institute of Architecture Design Awards. This Facility is Green Globes certified (2 Globes). Harden and renovated the existing three story 45,000 square foot Coral Springs Police Station and add a new 11,500 square foot two story addition for Fire Administration and Emergency Operation Center. CPZ worked closed with Larry DeRose formerly with DeRose Design Consultants which included new impact resistant windows and doors, new roof and any structural repairs that needed to bring the building up to current code. The City of Coral Springs decided to renovate the interior of the Police Station building with the extra 4 million left over from the budget. Interior renovations include new HVAC, new fire sprinklers, new finishes, new paint, new lighting, and reconfiguration of spaces to meet the police department’s needs. Full re-configuration of their existing seven-acre secure site. Site work included state of the art security gating and monitoring systems, re- configuration of parking areas, full landscape work and the creation of attractive and functional exterior gathering spaces to add to the planned spaces to add to the planned new City Corridor along Sample Road and Coral Springs Drive. Construction cost during bidding estimated at 12 million bids came in at 8 million. C P Z CPZ ARCHITECTS, INC. 4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317 1601 BELVEDERE RD., S-350, WEST PALM BEACH, FL 33406 200 N. EL MAR DRIVE, SUITE 201B, JENSEN BEACH, FLORIDA 34957 (954) 792-8525 AA# 26000685 WWW.CPZARCHITECTS. COM QUALIFICATIONS & EXPERIENCE Experience with Security CPZ Architects, Inc. has a great deal of experience with security including video surveillance, electronic door controls, and access card door control. We have had a continuing services contract with the Federal Reserve Bank of Atlanta, the Doral Branch for over 10 years in which we have done over 30 projects. We also have continuing service contracts with the Town of Davie and the City of Coral Springs where we have designed and renovated police stations, including the assessment of the City of Delray’s Police Station and fire stations. Video Surveillance We have installed video surveillance in the lobby of the Federal Reserve Bank and throughout the 20 acre area of the Doral Glades Park. Electronic Door Control The Federal Reserve Bank and all the Police and Fire Stations that we have done in the Town of Davie, City of Coconut Creek and the City of Coral Springs had to have secured door controls. We also had to provide this for the City of Doral Glades Park. Our SF330 form under projects will show this information. Access Card Door Control Besides the Federal Reserve Bank and the police stations, all the Fire Stations that we did in the Town of Davie FS#86, City of Coral Springs FS#80, 43, 95, City of Coconut Creek FS#50, City of West Palm Beach FS#4, City of Fort Lauderdale FS#8 had to have the access card door control. We also included this security at the Miami Gardens Community Center, Doral Glades Park and the Senior Center in Sunrise. Blast Study Our office was involved in the construction of a new remote lobby entrance to the Federal Reserve Bank after a blast study was performed to determine the possible threat level at the entry point. 5. SIMLAR PROJECTS OVER THE PAST 5 YEARS | partial list Village of Palm Springs Police Building Architectural Programming and Building Conditions Assessment Report, Lake Worth, Florida Client Contact: Village of Palm Springs | Sebastian Velazquez Feliu, Project Manager | 561.655.2423 Contract Date: 2021 Present Status: Ongoing Scope or Nature of the Contract: OCI Associates was selected as a sub-consultant to an Architectural firm to provide a Due Diligence Report and Building Conditions Assessment of an existing Police Station building located in Lake Worth. Our team members were required to provide a site visit and evaluate the following building systems; Mechanical Systems, Electrical Systems, Plumbing Systems, Fire Protection Systems, Low Voltage Systems. After the evaluation, our team provided a report of findings such as the general condition, MEP engineer’s opinion of overall serviceability and longevity as well as our recommendation for remedial repair or a completed replacement of the systems and a probable cost estimate. St. Lucie County Port St. Lucie Library Architectural Programming and Building Conditions Assessment Report, Port St. Lucie, Florida Client Contact: St. Lucie County | Scotty Beaulieu, Project Manager | 772.462.1432 Contract Date: 2021 Present Status: Ongoing Scope or Nature of the Contract: OCI Associates was selected as a sub-consultant to an Architectural firm to provide a Due Diligence Report and Building Conditions Assessment of an existing 6,000 -square-foot library to determine whether to expand the facility or build a new one. Our team members provided a site visit to the library and evaluate the following systems; Mechanical Systems, Electrical Systems, Plumbing Systems, Fire Protection Systems, Low Voltage Systems. After the evaluation, our team provided a report of our findings such as the general condition, MEP engineer’s opinion of overall serviceability and longevity as well as our recommendation for remedial repair or a completed replacement of the systems and a probable cost estimate. The report determined that the telecommunication cabling has been run as needed over the years but is inadequate for current needs. The Youth areas, stacks, community meeting room and staff areas are all inadequate and a new building has been determined as the best possible outcome for the district. Department of Military Affairs West Palm Beach District Court of Appeal Renovation, Due Diligence Report and Assessment, Palm Beach, Florida Client Contact: Department of Military Affairs | Sebastian Velazquez Feliu, Project Manager | 561.655.2423 Contract Date: 2020 Present Status: Ongoing Scope or Nature of the Contract: OCI Associates was selected as a sub-consultant to an Architectural firm to provide a Due Diligence Report and Building Conditions Assessment of the existing District Court of Appeal building. Our team members were required to provide a site visit to the building and evaluate the following systems; Mechanical Systems, Electrical Systems, Plumbing Systems, Fire Protection Systems, Low Voltage Systems. After the evaluation, our team provided a report of findings such as the general condition, MEP engineer’s opinion of overall serviceability and longevity as well as our recommendation for remedial repair or a completed replacement of the systems and a probable cost estimate. The report was provided to the Owner; and led the team to move forward with a new job order from the Owner to renovate the existing space into a Readiness Center for the US National Guard; which OCI is currently designing the new replacement systems for the project. Palm Beach Sheriff's Office Headquarters Annex - Architectural Programming and Building Conditions Assessment Report, Palm Beach, Florida Client Contact: Palm Beach Sheriff's Office | Sebastian Velazquez Feliu, Project Manager | 561.655.2423 Contract Date: 2019 Present Status: Completed Scope or Nature of the Contract: OCI Associates was selected as a sub-consultant to an Architectural firm to provide a Due Diligence Report and Building Conditions Assessment of the existing Sheriff's Office headquarters building located in Palm Beach. Our team members were required to provide a site visit and evaluate the following systems; Mechanical Systems, Electrical Systems, Plumbing Systems, Fire Protection Systems, Low Voltage Systems. After the evaluation, our team provided a report of findings such as the general condition, MEP engineer’s opinion of overall serviceability and longevity as well as our recommendation for remedial repair or a completed replacement of the systems and a probable cost estimate. PAST RECORD & PROJECT EXPERIENCE OF FEASIBILITY STUDIES & ASSESSMENTS Feasibility Studies & Reports Seminole State College Building V, Sanford, FLMechanical System Feasibility Study Florida South Western State College Childcare Building V, Lee Campus, Ft. Myers, FLMEP System Feasibility Study and Assessment St. Lucie County Building V, Clover Field Upgrade, St. Lucie, FLMechanical System Feasibility Study School District of Palm Beach County Pahokee High School, Pahokee, FLAssessment & Feasibility Report St. John Vianny Catholic SchoolChilled Water Feasibility Study, Orlando, FL School District of Indian River Glendale Elementary School, Vero Beach, FL HVAC Site Investigation & Feasibility Study School District of Osceola County Poinciana High School, Kissimmee, FLChilled Water Feasibility Study Flagler County Public SchoolsBelle Terre Elementary School, Palm Coast, FLFeasibility Study St. Lucie Public SchoolsWeatherbee Elementary School, Port Saint Lucie, FLFeasibility Study St. Lucie Public SchoolsFrancis K. Sweet Elementary School, Fort Pierce, FLFeasibility Study Valencia State CollegeWinter Park Campus, Winter Park, FLHVAC Feasibility Study Valencia State CollegeEast Campus, Orlando, FLChilled Water System Feasibility Study Valencia State CollegeBuilding D, Osceola Campus, Kissimmee, FLCafeteria Power Feasibility Study School District of Palm Beach County Pahokee High School, Palm Beach, FLFacility Condition Assessment School District of Palm Beach County West Technical Education Center, Belle Glade, FLAssessment & Feasibility Study St. Lucie Public Schools St. Lucie K-8, Port Saint Lucie, FLFeasibility Study St. Lucie Public Schools Southern Oaks Middle School, Port Saint Lucie, FLFeasibility Study Martin County School District Jensen Beach School, Jensen Beach, FLFeasibility Study Martin County School District South Fork High School, Stuart, FLCastaldi Report Florida Atlantic UniversityBS12 Renovation, Boca Raton, FLFeasibility Study Florida Atlantic UniversityGenerator Reconfiguration, Boca Raton, FLFeasibility Study & Report University of St. Augustine Health Sciences Building, St. Augustine, FLDue Diligence Report GOVERNMENT FACILITIES Social Security Administration Center CFD, Baltimore, MD Computational Fluid Dynamic (CFD) Analysis and a Disaster Mitigation Study Okeechobee CountyAll County Buildings, Okeechobee, FL Facilities UV Report Okeechobee CountyHealth Department, Okeechobee, FLHVAC Feasibility Report West Palm Beach Court Building Renovation Analysis, West Palm Beach, FL The City of Jupiter Community Center, Jupiter, FLDue Diligence Report Palm Beach County DramaWorks Theater, West Palm Beach, FLComplete Assessment and Feasibility Study of HVAC Systems Palm Beach Sheriff’s Office HQ Annex, Palm Beach, FLDue Diligence Report Osceola County Command Center Conversion, Kissimmee, FLMEP Feasibility Study Florida Highway PatrolTroop D Headquarters, Cocoa, FLRoof Replacement Feasibility Study Florida Highway PatrolOrlando I-Drive Facility, Orlando, FLDue Diligence Report & Facility Assessment Health Management Associates Health Managerment Associates Headquarters, Naples, FLBuilding Assessment & Feasibility Report US General Services AdministrationCourthouse, San Francisco, CAFeasibility Study Social Security AdministrationMain Complex, Washington, D.C.Short Circuit & Operations Coordination & Feasibility Study Social Security Administration14A10 MATSSC, Washington, D.C.Generator Exhaust Stack Feasibility Study Social Security Administration14A7 MATSS, Washington, D.C.AHU Reconditioning Feasibility Study GEO Group/Florida Department of Corrections South Bay Correctional Facility, South Bay, FLPlumbing Investigation & Feasibility Study Volusia County Transfer Station Feasibility Study, Deland, FL Osceola County Publix Feasibility Study, Kissimmee, FL AIRPORT San Francisco International AirportGBAS Feasibility Study, San Francisco, CA San Francisco International AirportSuperbay Hangar, San Francisco, CA Hangar Door Brake Feasibility Study San Francisco International Airport Professional Services for NFPA 25 Airfield San Francicso, CABuilding Survey and Development of Test Procedures COUNTRY CLUBS Lexington Country ClubCountry Club Retirement Community, Fort Myers, FLPlumbing DWV Assessment & Feasibility Report Moorings Park at Grey Oaks Country Club Retirement Community, Naples, FLPlumbing Assessment & Feasibility Report Harbour Ridge Country Club - Fitness Center, Palm City, FLFeasibility Study Harbour Ridge Country Club - Club House, Palm City, FL Feasibility Study McArthur Golf Club Due Diligence Report, Hobe Sound, FL OTHER Self Help Credit UnionDue Diligence Assessment & Feasibility Study, Deland, FL Ivy City SmokehouseSite Survey & Feasibility Study, Washington, D.C. NexAir Plant GBAS Feasibility Study, Orlando, FL Hard Rock Hotel Resort Hard Rock Hotel Punta Cana, Dominican RepublicMechanical and Electrical Energy & Feasibility Study MASTER PLANNING PROJECTS Daytona State CollegeMasterplan, Deltona Campus, Deltona, FL Florida Gulf Coast UniversityMasterplan, Ft. Myers, FL San Francisco International Airport Superbay Hangar Fire Protection, Master Plan, San Francisco, CA GOVERNMENT FACILITIES Social Security AdministrationAdministration Building, Altmeyer, Washington, D.C. EHR Water Pressure Study St. Lucie County Library Branch Assessment, Port Saint Lucie, FL EDUCATIONAL FACILITIES Valencia State CollegeBuilding 4, East Campus, Orlando, FLEnergy Study Flagler County Public SchoolsRymfrie Elementary School, Palm Coast, FLInvestigation Study School District of Osceola County Bellalago Academy, Kissimmee, FLCentral Energy Plant Acoustical Analysis Florida SouthWestern University State CollegeCommunication System, Fort Myers, FLSite Survey & Report Florida SouthWestern University State CollegeLee Campus Building V, Fort Myers, FLMEP Assessment Report Florida Gulf Coast UniversityMerwin Hall Faculty, Fort Myers, FLMEP Assessment Report School District of Osceola CountyKissimmee Elementary School, Kissimmee, FLAHU-5.2 Analysis & Recommendations Florida Gulf Coast UniversitySeidler Hall, Fort Myers, FLField Survey Charlotte County Public SchoolsDeep Creek Elementary School, Punta Gorda, FLPower Assessment Miami-Dade CollegeWest Campus, Miami, FLCEP CH-3 Pump Analysis Valencia State College West Campus Chilled Water Distribution, Orlando, FL Chipola State CollegeCampus Chilled Water Distribution, Marianna, FL Indian River State CollegeChilled Water Distribution, Main Campus, Fort Pierce, FL Embry Riddle Aeronautical University MicaPlex Advanced Aerodynamics Laboratory, Daytona Beach, FLChilled Water & Thermal Storage System Florida Polytechnic UniversityChilled Water Distribution, Lakeland, FL OTHER Bar Tulia at MercatoHVAC Assessment, Naples, FL Surferider CondominiumsFire Pump Study, Indialantic, FL Palm BeachDramaWorks Theater, West Palm Beach, FLHVAC Assessment PAST RECORD & PROJECT EXPERIENCE OF FEASIBILITY STUDIES & ASSESSMENTS C P Z FINANCIAL STABILITY AND STATEMENTS CPZ ARCHITECTS, INC. 4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317 1601 BELVEDERE RD., S-350, WEST PALM BEACH, FL 33406 200 N. EL MAR DRIVE, SUITE 201B, JENSEN BEACH, FLORIDA 34957 (954) 792-8525 AA# 26000685 WWW.CPZARCHITECTS. COM CPZ Architects, Inc. has been in business for over 19 years and is a growing financially viable company. Its founder, Chris Zimmerman, believes in having no debt and paying all his bills in a timely manner. This philosophy has carried us through the tough times of the past recession, and we are still as financially strong as we were before. Our Dun and Bradstreet number is #15-721-5455 however, we do not subscribe to Dun and Bradstreet so you may not be able to gather up to date information from them. We would be more than willing to provide any information that you require. Based on our great credit history, we have had a substantial line of credit with Bank of America. However, our company has been properly managed and has not ever needed to tap this resource. Please call John Vasquez, our Client Manager at 888-852-5000 Ext. 3275. CPZ Architects is a stable and sound company with a staff of 17 employees, some of whom have worked for the company for over 8 years. CPZ Architects isn’t nor ever has been involved with any bankruptcy proceedings and as a testament to our well run and professional office, WE HAVE NEVER HAD ANY LITIGATION AGAINST US AND WE HAVE NEVER BEEN INVOLVED IN ANY PRIOR OR CURRENT BANKRUPTCY PROCEEDINGS. Summary: • Single Owner Firm • Cash Assets/Reserve Fund • Credit Line that has never been used • Owner owned office building • NO DEBT, our office does not lease or rent any equipment. Everything is paid in full • Firm has no outstanding loans • Never failed to pay employees or consultants. CPZ Architects has submitted our Profit and Loss statements for the last three years. As shown our firm is in financially stable and a statement from our accountant will be provided if required. Jan - Dec 18 Ordinary Income/Expense Income 1222 · Retainage -11,589.10 4100 · Project Revenue 2,679,489.00 4110 · Print Services 10,449.00 4130 · Reimbursables 40,250.91 4200 · Bad Debt -4,860.50 Total Income 2,713,739.31 Cost of Goods Sold 5100 · Consultants Civil Engineer 128,066.42 Cost Estimating 68,788.53 Landscape Architect 134,226.47 LEED commissioning 2,335.00 MEP Consultant 329,768.39 Parking 28,355.00 Pool Consultant 15,875.00 Structural Engineer 243,365.61 Surveyor 126,878.60 Testing Services 28,626.42 Traffic 1,290.50 5100 · Consultants - Other 56,970.03 Total 5100 · Consultants 1,164,545.97 5101 · Contractor 2,000.00 5210 · Bid Fees 1,680.00 5400 · Permiting Fees 1,754.45 5500 · Printing and Reproduction 4,142.81 5600 · Reimburseable Expenses 20.00 Total COGS 1,174,143.23 Gross Profit 1,539,596.08 Expense 6100 · Advertising Expense 4,189.08 6120 · Car/Truck Expense Gas & Oil 3,137.90 Mileage 3,967.55 Repairs & Maintenance 425.92 Tolls and Parking 977.88 Total 6120 · Car/Truck Expense 8,509.25 6130 · Cleaning/Janitorial 4,364.00 6140 · Computer Hardware 1,028.16 6150 · Computer Software 23,845.96 6160 · Computer Supplies 3,935.81 6170 · Computer Support 13,636.89 6180 · Contributions PAC 3,400.00 6180 · Contributions - Other 2,901.14 Total 6180 · Contributions 6,301.14 6190 · Depreciation Expense 27,298.32 6200 · Dues and Subscriptions 5,626.59 6210 · Education 734.00 6220 · Flowers 323.21 6230 · Gifts 2,428.38 6240 · Insurance Auto Insurance 1,870.02 Dental Insurance 2,382.23 General Liability Insurance 2,900.89 10:39 AM CPZ Architects, Inc. 11/29/21 Profit & Loss Cash Basis January through December 2018 Page 1 Jan - Dec 18 Health Insurance Officer 0.00 Health Insurance - Other 38,773.93 Total Health Insurance 38,773.93 Key Man Insurance 3,575.00 Professional Liability Insuranc 25,700.10 Umbrella 435.00 Vision Insurance 662.47 Worker's Compensation 2,828.23 Total 6240 · Insurance 79,127.87 6250 · Licenses and Permits 1,036.24 6255 · Marketing 5,229.77 6260 · Meals & Entertainment 7,302.43 6270 · Meetings 4,052.84 6275 · Merchant Fees 1,171.96 6280 · Miscellaneous 0.00 6290 · Office Operating Expenses 453.00 6292 · Office Expense 349.99 6295 · Office Supplies 12,990.26 6300 · Payroll Expenses Payroll Processing Fees 776.00 Total 6300 · Payroll Expenses 776.00 6330 · Postage and Delivery 1,395.42 6350 · Professional Development 3,986.50 6360 · Professional Fees Accounting Fees 7,294.98 Consulting Fees 4,000.00 6360 · Professional Fees - Other 1,030.00 Total 6360 · Professional Fees 12,324.98 6370 · Photographs 1,000.00 6390 · Promotion - Boat 1,026.90 6400 · Rent 83,376.00 6410 · Repairs and Maintenance Equipment Repairs 1,430.90 Office Repairs 95.51 Total 6410 · Repairs and Maintenance 1,526.41 6420 · Security Systems & Monitoring 929.16 6440 · Tax - Property 85.30 6460 · Telephone/Internet Costs Cell Phone 4,475.47 6460 · Telephone/Internet Costs - Other 6,345.39 Total 6460 · Telephone/Internet Costs 10,820.86 6470 · Travel 2,083.88 6480 · Uniforms 619.24 6490 · Utilities 8,930.83 6500 · Wages - Non Project Related Payroll Tax Expenses FICA 62,815.11 FUTA 672.00 SUTA 112.00 Total Payroll Tax Expenses 63,599.11 Wages - Office Staff 639,016.27 Wages - Officer Salary 291,926.86 Total 6500 · Wages - Non Project Related 994,542.24 10:39 AM CPZ Architects, Inc. 11/29/21 Profit & Loss Cash Basis January through December 2018 Page 2 Jan - Dec 18 6550 · 401K Profit Sharing Profit Sharing Contribution 39,970.42 Safe Harbor Contribution 20,243.13 Total 6550 · 401K Profit Sharing 60,213.55 6560 · Website Costs 1,840.00 8100 · void 0.00 Total Expense 1,399,412.42 Net Ordinary Income 140,183.66 Other Income/Expense Other Income 7000 · Other Income Interest Income 58.13 Total 7000 · Other Income 58.13 Total Other Income 58.13 Other Expense 8000 · Other Expense Interest Expense 8.85 Total 8000 · Other Expense 8.85 Total Other Expense 8.85 Net Other Income 49.28 Net Income 140,232.94 10:39 AM CPZ Architects, Inc. 11/29/21 Profit & Loss Cash Basis January through December 2018 Page 3 Jan - Dec 19 Ordinary Income/Expense Income 1222 · Retainage -6,770.33 4100 · Project Revenue 2,931,221.12 4110 · Print Services 29,988.84 4130 · Reimbursables 20,040.14 4200 · Bad Debt -5,977.50 Total Income 2,968,502.27 Cost of Goods Sold 5100 · Consultants Civil Engineer 165,481.80 Cost Estimating 25,876.20 Landscape Architect 156,049.48 LEED commissioning 18,365.00 MEP Consultant 338,819.89 Parking 19,377.35 Pool Consultant 12,625.00 Structural Engineer 200,377.17 Surveyor 84,280.00 Testing Services 38,740.92 5100 · Consultants - Other 62,971.00 Total 5100 · Consultants 1,122,963.81 5101 · Contractor 2,200.00 5210 · Bid Fees 2,555.00 5220 Travel job cost 3,245.85 5400 · Permiting Fees 500.00 5500 · Printing and Reproduction 2,845.22 Total COGS 1,134,309.88 Gross Profit 1,834,192.39 Expense Promotions 669.55 6100 · Advertising Expense 6,867.92 6110 · Bank Service Charges 27.80 6120 · Car/Truck Expense Gas & Oil 2,945.26 Lease 4,464.00 Mileage 3,019.95 Repairs & Maintenance 1,987.91 Tolls and Parking 817.58 Total 6120 · Car/Truck Expense 13,234.70 6130 · Cleaning/Janitorial 4,511.00 6140 · Computer Hardware 2,826.04 6150 · Computer Software 26,485.73 6160 · Computer Supplies 1,193.05 6170 · Computer Support 13,190.98 6180 · Contributions PAC 500.00 Total 6180 · Contributions 500.00 6190 · Depreciation Expense 49,864.38 6200 · Dues and Subscriptions 4,946.18 6210 · Education 4,894.74 6220 · Flowers 251.38 6230 · Gifts 2,263.46 6240 · Insurance Auto Insurance 3,440.87 Dental Insurance 3,201.00 General Liability Insurance 2,951.95 10:39 AM CPZ Architects, Inc. 11/29/21 Profit & Loss Cash Basis January through December 2019 Page 1 Jan - Dec 19 Health Insurance Officer 0.00 Health Insurance - Other 70,064.74 Total Health Insurance 70,064.74 Key Man Insurance 3,575.00 Professional Liability Insuranc 20,502.00 Umbrella 1,575.00 Vision Insurance 1,021.20 Worker's Compensation 4,022.00 Total 6240 · Insurance 110,353.76 6250 · Licenses and Permits 921.63 6255 · Marketing 4,332.02 6260 · Meals & Entertainment 9,719.89 6265 · Sponsorship 5,065.00 6270 · Meetings 7,728.01 6275 · Merchant Fees 1,899.99 6280 · Miscellaneous 0.00 6290 · Office Operating Expenses 263.42 6292 · Office Expense 318.00 6295 · Office Supplies 14,868.36 6300 · Payroll Expenses Payroll Processing Fees 780.00 Total 6300 · Payroll Expenses 780.00 6330 · Postage and Delivery 1,380.90 6350 · Professional Development 3,505.03 6360 · Professional Fees Accounting Fees 7,938.49 Consulting Fees 13,500.00 6360 · Professional Fees - Other 2,006.60 Total 6360 · Professional Fees 23,445.09 6370 · Photographs 1,500.00 6390 · Promotion - Boat 928.76 6400 · Rent 98,900.00 6410 · Repairs and Maintenance Equipment Repairs 3,488.69 Office Repairs 2,485.39 Total 6410 · Repairs and Maintenance 5,974.08 6420 · Security Systems & Monitoring 947.44 6440 · Tax - Property 718.70 6460 · Telephone/Internet Costs Cell Phone 3,315.09 6460 · Telephone/Internet Costs - Other 6,223.18 Total 6460 · Telephone/Internet Costs 9,538.27 6470 · Travel 3,942.47 6480 · Uniforms 1,191.73 6490 · Utilities 9,155.19 6500 · Wages - Non Project Related Payroll Tax Expenses FICA 70,831.81 FUTA 755.25 SUTA 125.87 Payroll Tax Expenses - Other 0.00 Total Payroll Tax Expenses 71,712.93 10:39 AM CPZ Architects, Inc. 11/29/21 Profit & Loss Cash Basis January through December 2019 Page 2 Jan - Dec 19 Wages - Office Staff 731,779.88 Wages - Officer Salary 293,142.85 Total 6500 · Wages - Non Project Related 1,096,635.66 6550 · 401K Profit Sharing Profit Sharing Contribution 59,548.05 Safe Harbor Contribution 25,837.00 Total 6550 · 401K Profit Sharing 85,385.05 6560 · Website Costs 1,779.50 8100 · void 0.00 Total Expense 1,632,904.86 Net Ordinary Income 201,287.53 Other Income/Expense Other Income 7000 · Other Income Interest Income 112.43 Total 7000 · Other Income 112.43 Total Other Income 112.43 Net Other Income 112.43 Net Income 201,399.96 10:39 AM CPZ Architects, Inc. 11/29/21 Profit & Loss Cash Basis January through December 2019 Page 3 Jan - Dec 20 Ordinary Income/Expense Income 1222 · Retainage -47,885.85 4100 · Project Revenue 3,754,475.45 4110 · Print Services 7,770.66 4130 · Reimbursables 34,056.09 4200 · Bad Debt -0.13 Total Income 3,748,416.22 Cost of Goods Sold 5100 · Consultants Low Voltaget 1,325.00 Building Envelope 12,500.00 Civil Engineer 281,564.72 Cost Estimating 154,492.40 Design Consultant 109,419.75 Landscape Architect 45,762.30 LEED commissioning 6,355.00 MEP Consultant 393,111.16 Structural Engineer 235,704.86 Surveyor 47,033.18 Testing Services 102,640.77 Traffic 5,908.00 5100 · Consultants - Other 84,567.47 Total 5100 · Consultants 1,480,384.61 5101 · Contractor 961.00 5210 · Bid Fees 2,540.00 5220 Travel job cost 602.37 5400 · Permiting Fees 4,684.25 5500 · Printing and Reproduction 2,164.09 Total COGS 1,491,336.32 Gross Profit 2,257,079.90 Expense 6102 · Recruitment Expense 5,921.11 6380 · Finance Charges 195.16 Promotions 5,240.00 6100 · Advertising Expense 797.15 6111 · Bank Error 2,718.43 6120 · Car/Truck Expense Gas & Oil 2,158.19 Lease 5,952.00 Mileage 1,362.38 Registration & License 144.35 Repairs & Maintenance 2,658.96 Tolls and Parking 682.56 Total 6120 · Car/Truck Expense 12,958.44 6130 · Cleaning/Janitorial 4,891.00 6140 · Computer Hardware 4,539.25 6150 · Computer Software 43,289.55 6160 · Computer Supplies 2,432.93 6170 · Computer Support 19,875.34 6180 · Contributions PAC 1,000.00 Total 6180 · Contributions 1,000.00 6190 · Depreciation Expense 45,626.75 6200 · Dues and Subscriptions 5,304.08 6210 · Education 718.95 6220 · Flowers 476.04 6230 · Gifts 4,333.23 10:38 AM CPZ Architects, Inc. 11/29/21 Profit & Loss Cash Basis January through December 2020 Page 1 Jan - Dec 20 6240 · Insurance Auto Insurance 3,980.46 Dental Insurance 3,743.22 General Liability Insurance 3,365.36 Health Insurance Officer 0.00 Health Insurance - Other 75,018.90 Total Health Insurance 75,018.90 Key Man Insurance 3,575.00 Professional Liability Insuranc 22,889.00 Umbrella 1,140.00 Vision Insurance 1,165.36 Worker's Compensation 2,942.00 6240 · Insurance - Other -46.38 Total 6240 · Insurance 117,772.92 6250 · Licenses and Permits 1,164.54 6255 · Marketing 939.31 6260 · Meals & Entertainment 4,267.34 6265 · Sponsorship 3,475.00 6270 · Meetings 5,079.33 6275 · Merchant Fees 1,503.83 6280 · Miscellaneous 0.00 6290 · Office Operating Expenses 2,616.12 6292 · Office Expense 398.00 6293 · Covid 19 Expenses 5,272.00 6295 · Office Supplies 19,529.88 6300 · Payroll Expenses Payroll Processing Fees 901.00 Total 6300 · Payroll Expenses 901.00 6330 · Postage and Delivery 1,677.55 6350 · Professional Development 2,391.81 6360 · Professional Fees Accounting Fees 8,951.40 Consulting Fees 21,500.00 Legal Fees 3,468.00 6360 · Professional Fees - Other 770.00 Total 6360 · Professional Fees 34,689.40 6370 · Photographs 3,874.90 6390 · Promotion - Boat 505.41 6400 · Rent 94,540.00 6410 · Repairs and Maintenance Equipment Repairs 3,974.40 Office Repairs 8,320.17 6410 · Repairs and Maintenance - Other 103.98 Total 6410 · Repairs and Maintenance 12,398.55 6420 · Security Systems & Monitoring 961.24 6440 · Tax - Property 438.80 6460 · Telephone/Internet Costs Cell Phone 3,461.75 6460 · Telephone/Internet Costs - Other 6,925.08 Total 6460 · Telephone/Internet Costs 10,386.83 6470 · Travel 384.88 6480 · Uniforms 1,542.74 6490 · Utilities 8,781.94 6500 · Wages - Non Project Related COVID Paid Leave Family 11,461.14 10:38 AM CPZ Architects, Inc. 11/29/21 Profit & Loss Cash Basis January through December 2020 Page 2 Jan - Dec 20 Payroll Tax Expenses FICA 87,149.97 FUTA 882.00 SUTA 147.00 Payroll Tax Expenses - Other 0.00 Total Payroll Tax Expenses 88,178.97 Wages - Office Staff 905,725.96 Wages - Officer Salary 342,883.62 Total 6500 · Wages - Non Project Related 1,348,249.69 6550 · 401K Profit Sharing Profit Sharing Contribution 75,115.25 Safe Harbor Contribution 25,300.34 Total 6550 · 401K Profit Sharing 100,415.59 6560 · Website Costs 599.40 6565 · Social Media 5,400.00 8100 · void 0.00 Total Expense 1,950,475.41 Net Ordinary Income 306,604.49 Other Income/Expense Other Income PPP Loan Forgiveness 210,500.00 7000 · Other Income COVID refund 4,077.88 Interest Income 268.15 Total 7000 · Other Income 4,346.03 Total Other Income 214,846.03 Net Other Income 214,846.03 Net Income 521,450.52 10:38 AM CPZ Architects, Inc. 11/29/21 Profit & Loss Cash Basis January through December 2020 Page 3 LETTER OF RECOMMENDATION TO WHOM IT MAY CONCERN: Mark Curran Fire Chief August 3, 2012 The Coral Springs Fire Department has had the pleasure to work with CPZ Architects, Inc. on three different projects. The first was Fire Station 80, which is our main fire station located on Coral Springs Drive. This particular design received honorable mention from FIRE CHIEFS magazine, for Fire Station Design 2012. This was quite an accomplishment considering they were competing with Architects from across the country. The second project was Fire Station 64 located on Ramblewood Drive, both of the stations were new construction. The third project was a computer room project located in the Fire Training Center. CPZ was very professional and worked very well with the end users (firefighters), on the design and their needs, allowing them to operate out of a station for 24 hours at a time. The firm was very responsive to issues that came up during construction and were very amenable. I have been with the City of Coral Springs for 28 years and have to say that CPZ is one of the best firms the city has ever hired. Sincerely, Fire Chief Curran Delray Beach Police Department 300 West Atlantic Avenue Delray Beach, Florida 33444-3695 (561) 243-7888 Fax (561) 243-7816 Delray Beach Florida b01- 11H11fficaffl) • \Ir,_¡ Jeffrey S. Goldman Chief of Police Accredited Since 2004 1993•2001•2017 September 28, 2018 To whom it may concern: Re: Letter of Recommendation for CPZ Architects, Inc. The Delray Beach Police Department has been diligently working with CPZ Architects, Inc. in reference to an Assessment Report on the expansion and/or replacement of the existing facility. Representatives of CPZ Architects, Inc., have met with members of Command Staff and generated a questionnaire to determine the "needs assessment" for space allocations required for all of our personnel. Through staff interviews and detailed examination of our current facilities, they completed a detailed report and presentation which included options for the future structure of the Police Department that would better meet our needs. During our continued collaboration on this project, CPZ Architects, Inc. representatives have been diligent, responsive and have taken into consideration our feedback and our requirements. CPZ Architects, Inc. is a firm that has been very responsible and always has the client's best interest in mind. We would highly recommend CPA Architect's Inc. for any of your future project. Sincerely, MO/bes L.E.A.D. the Way! Learning, Excellence, Accountability, and Diversity REFERENCES May 8, 2020 Collier County EMS 8075 Lely Cultural Parkway, Suite: #267 Naples, FL 34113 Re: OCI Associates, Inc. To Whom It May Concern: I am pleased to take this opportunity to recommend OCI Associates, Inc. My experience with this engineering firm was during the construction of our recent fire station on Captiva Island. The project was a complex design in order to meet the demands of the Fire District. The Captiva station is the only one on the island, which meant it had to function in many roles for the administration, operations, and training staff. The challenge we presented for the MEP design was that we wanted the building to be as green and mechanically efficient as possible. The station would have to function as our EOC after a catastrophic event such as hurricane while running on generator power for potentially 2-3 weeks. This meant we had to use as little power as necessary to operate while at the same time providing power to the entire station for crews to live and work in. We also wanted the fire protection system to be designed with a separate training module built-in to supply our training stairwell. The system needed to provide protection to the facility while at the same time having a section not active in order to operate in a training scenario. I feel in conjunction with Sweet Sparkman Architects, OCI did a fantastic job meeting these demands for us. In closing, I would like to recommend OCI Associates as a very effective and professional engineering firm, and I wish you well in your project. Respectfully, Jeff Pawul, Fire Chief Captiva Island Fire District 239-472-9494 x203 jpawul@captivafire.com REFERENCES REFERENCES C P Z CPZ ARCHITECTS, INC. 4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317 200 N. EL MAR DRIVE, SUITE 200, JENSEN BEACH, FLORIDA 34957 (954) 792-8525 AA #26000685 WWW.CPZARCHITECTS.COM CPZ ARCHITECTS AWARDS C P Z CPZ ARCHITECTS, INC. 4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317 200 N. EL MAR DRIVE, SUITE 200, JENSEN BEACH, FLORIDA 34957 (954) 792-8525 AA #26000685 WWW.CPZARCHITECTS.COM CPZ ARCHITECTS AWARDS C P Z CPZ ARCHITECTS, INC. 4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317 200 N. EL MAR DRIVE, SUITE 200, JENSEN BEACH, FLORIDA 34957 (954) 792-8525 AA #26000685 WWW.CPZARCHITECTS.COM CPZ ARCHITECTS AWARDS C P Z CPZ ARCHITECTS, INC. 4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317 200 N. EL MAR DRIVE, SUITE 200, JENSEN BEACH, FLORIDA 34957 (954) 792-8525 AA #26000685 WWW.CPZARCHITECTS.COM CPZ ARCHITECTS AWARDS C P Z CPZ ARCHITECTS, INC. 4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317 200 N. EL MAR DRIVE, SUITE 200, JENSEN BEACH, FLORIDA 34957 (954) 792-8525 AA #26000685 WWW.CPZARCHITECTS.COM CPZ ARCHITECTS AWARDS C P Z CPZ ARCHITECTS, INC. 4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317 200 N. EL MAR DRIVE, SUITE 200, JENSEN BEACH, FLORIDA 34957 (954) 792-8525 AA #26000685 WWW.CPZARCHITECTS.COM CPZ ARCHITECTS AWARDS C P Z CPZ ARCHITECTS, INC. 4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317 200 N. EL MAR DRIVE, SUITE 200, JENSEN BEACH, FLORIDA 34957 (954) 792-8525 AA #26000685 WWW.CPZARCHITECTS.COM CPZ ARCHITECTS AWARDS C P Z CPZ ARCHITECTS, INC. 4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317 200 N. EL MAR DRIVE, SUITE 200, JENSEN BEACH, FLORIDA 34957 (954) 792-8525 AA #26000685 WWW.CPZARCHITECTS.COM CPZ ARCHITECTS AWARDS C P Z CPZ ARCHITECTS, INC. 4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317 1601 BELVEDERE RD., S-350, WEST PALM BEACH, FL 33406 200 N. EL MAR DRIVE, SUITE 201B, JENSEN BEACH, FLORIDA 34957 (954) 792-8525 AA# 26000685 WWW.CPZARCHITECTS. COM LICENSES & CERTIFICATIONS CPZ Architects, Inc.- All Florida State of Florida Department of State P02000128253 Licenses Florida Department of Professional Regulation CPZ Architects, Inc. AA26000685 Chris P. Zimmerman AR0010995 CBE Certification See Tab 19 U.S. Green Bldg. Council CPZ Architects Broward County Taxes Receipt # 316-353 Receipt #1CP-16-00021914 Plantation Tax Certificate Account #OC0203663 Moffatt & Nichol Licenses- All Florida State of Florida, Department of State P06383 Licenses Florida Department of Professional Regulation M&N #4877 Lawrence Derose #20169 Ludovic Biner #72274 LEED Accredited Professional Certification April 6, 2009 OCI Engineering, LLC- All Florida State of Florida, Department of State L06000089796 Sudama Wijegunawardana, PE #63143 Jason Smith, PE #57743 Amir Kazeminia, PE #42619 Construction Management Services (CMS) State of Florida Department of State: 659282 Licenses Florida Department of Professional Regulation: NA Copies of actual licenses are available upon request. 5. NAME OF FIRM PART I - CONTRACT-SPECIFIC QUALIFICATIONS ARCHITECT - ENGINEER QUALIFICATIONS A. CONTRACT INFORMATION 1. TITLE AND LOCATION (City and State) 2. PUBLIC NOTICE DATE 3. SOLICITATION OR PROJECT NUMBER B. ARCHITECT-ENGINEER POINT OF CONTACT C. PROPOSED TEAM (Complete this section for the prime contractor and all key subcontractors.) 4. NAME AND TITLE 8. E-MAIL ADDRESS7. FAX NUMBER6. TELEPHONE NUMBER (Check)PRIMEJ-V PARTNERSUBCON- TRACTOR9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT a. b. c. d. e. f. (Attached)D. ORGANIZATIONAL CHART OF PROPOSED TEAM CHECK IF BRANCH OFFICE CHECK IF BRANCH OFFICE CHECK IF BRANCH OFFICE CHECK IF BRANCH OFFICE CHECK IF BRANCH OFFICE CHECK IF BRANCH OFFICE Chris P. Zimmerman, AIA, President CPZ Architects, Inc. 954-792-8525 NA Chris@cpzarchitects.com CPZ Architects, Inc.4316 W. Broward Blvd. Architect Plantation, Florida Moffatt & Nichol Structural Engineer100 W Cypress Creek Road, Suite 960 Fort Lauderdale, FL 33309 OCI & Associates MEP Engineer777 Brickell Ave. Suite 500 Miami, FL 33131 X g. CHECK IF BRANCH OFFICE X X X Space Needs Assessment and Site Feasibility Study RFQ 21-10-01 X CMS-Constructionb Management Services 10 Fairway Drive Suite 301 Deerfield Beach, FL 33441 Cost Estimator STANDARD FORM 330 (REV. 8/2016) ARCHITECT-ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (If any) PART II – GENERAL QUALIFICATIONS (If a firm has branch offices, complete for each specific branch office seeking work.) 2a. FIRM (OR BRANCH OFFICE) NAME Moffatt & Nichol 3. YEAR ESTABLISHED 2019 4. UNIQUE ENTITY IDENTIFIER 117035044 2b. STREET 100 W. Cypress Creek Road, Suite 960 5. OWNERSHIP 2c.CITY Fort Lauderdale 2d. STATE FL 2e. ZIP CODE 33309-2115 a. TYPE Corporation b. SMALL BUSINESS STATUS 6a. POINT OF CONTACT NAME AND TITLE Kenneth Parkinson, AICP , Vice President 7. NAME OF FIRM (If block 2a is a branch office) Moffatt & Nichol 6b. TELEPHONE NUMBER (954) 622-8100 6c. E-MAIL ADDRESS kparkinson@moffattnichol.com 8a. FORMER FIRM NAME(S) (If any) 8b. YR. ESTABLISHED 8c. UNIQUE ENTITY IDENTIFIER 10. PROFILE OF FIRM’S EXPERIENCE AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function Code b. Discipline c. No. of Employees a. Profile Code b. Experience c. Revenue Index Number (see below) (1) FIRM (2) BRANCH 02 Administration 120 1 C07 Coastal Engineering 2 08 CADD Technician 77 D04 Design -Build Preparation of RFPs 1 12 Civil Engineer 76 D08 Dredging Studies & Design 1 15/16 Construction Inspector/Manager 11 E03 Electrical Studies & Design 1 21 Electrical Engineer 21 E09 EIS, EA, Environmental Statements 2 23/24 Environmental Engineer/Scientist 26 H01 Harbors; Jetties; Piers; Ship Terminals 1 27 Foundation/Geotechnical Engineer 5 P05 Planning (Community, Regional) 1 29 GIS Specialist 6 P06 Planning (Site, Installation, & Project) 1 42 Mechanical Engineer 10 M02 Materials Handling Systems 1 47 Planner: Urban/Regional (Waterfront) 6 R04 Recreation Facilities (Parks, Marinas) 2 48 Project Manager 35 1 R11 Rivers; Canals; Flood Control 1 57 Structural Engineer 183 S13 Stormwater Handling & Facilities 1 60 Transportation Engineer 47 1 W02 Water Resources; Groundwater 1 62 Water Resources Engineer 23 Civil Site Work 1 Coastal/Hydraulic Engineer/Scientist 76 1 Lake Reh abilitation & Management 1 Dredging Specialist/Engineer 5 Mathematical Modeling 1 NEPA Planners 4 Wetlands 1 Port Planner/Engineer 13 1 Rail Engineer/Specialist 15 Transportation Economist 8 Transportation Planner 2 Other Employees 67 Total 835 5 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF ENTIRE FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right) PROFESSIONAL SERVICES REVENUE INDEX NUMBER 1. Less than $100,000 6. $2 million to less than $5 million 2. $100,000 to less than $250,000 7. $5 million to less than $10 million 3. $250,000 to less than $500,000 8. $10 million to less than $25 million 4. $500,000 to less than $1 million 9. $25 million to less than $50 million 5. $1 million to less than $2 million 10. $50 million or greater a. Federal Work 8 b. Non-Federal Work 10 c. Total Work 10 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. a. SIGNATURE b. DATE 02/01/2021 c. NAME AND TITLE Kenneth Parkinson, A ICP , Vice President ARCHITECT-ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (If any)RFQ# 21-10-01 PART II – GENERAL QUALIFICATIONS 2a. FIRM (OR BRANCH OFFICE) NAME OCI Associates, Inc. 3. YEAR ESTABLISHED 1987 4. DUNS NUMBER 959734864 2b. STREET 600 S. Orlando Avenue 5. OWNERSHIP a. TYPE Corporation b. SMALL BUSINESS STATUS Federal (Self Certified) 2c. CITY Maitland 2d. STATE FL 2e. ZIP 32751 6a. POINT OF CONTACT NAME AND TITLE Amir Kazeminia, PE, President + CEO 6b. TELEPHONE NUMBER 407-332-5110 6c. E-MAIL ADDRESS amir@ociassociates.com 7. NAME OF FIRM (If block 2a is a branch office) N/A 8a. FORMER FIRM NAMES(S) (If any) N/A 8b. YR. ESTABLISHED N/A 8c. DUNS NUMBER N/A 9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM’S EXPERIENCES AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS a. Function Code b. Discipline c. No. of Employees a. Profile Code b. Experience c. Revenue Index Number (see below)(1) FIRM (2) BRANCH 02 Administration 10 A05 Airports, Terminals and Hangars 5 08 CAD Technicians 06 C06 Churches; Chapels 1 13 Communications Engineers 02 C10 Commercial Buildings (low rise)4 21 Electrical Engineers 16 C11 Community Facilities 2 25 Fire Protection Engineers 02 E02 Educational Facilities (Classrooms)5 42 Mechanical Engineers 14 D07 Dining Halls, Clubs and Restaurants 5 48 Project Manager | Mechanical 05 E03 Electrical Studies and Design 5 48 Project Manager | Electrical 05 F03 Fire Protection 4 48 Project Manager | Plumb/FP 02 H04 Heating; Ventilating; Air 5 Commissioning 03 H06 Highrise 4 Plumbing Designers 07 H09 Hospitals & Medical Facilities 3 Lighting Designers 01 H10 Hotels 4 H11 Housing (Residential)4 J01 Judicial and Courtroom Facilities 1 L01 Libraries, Museums, Galleries 2 L05 Lighting (Interiors; Display)2 L06 Lighting (Exteriors; Streets)2 O01 Office Buildings; Industrial Parks 5 P07 Plumbing & Piping Design 4 P08 Prisons & Correctional Facilities 5 P13 Public Safety Facilities 6 R05 Recreation Facilities (Parks, Marinas)1 R06 Rehabilitation (Buildings) 3 Total 70 R08 Research Facilities 4 11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right)PROFESSIONAL SERVICES REVENUE INDEX NUMBER 1. Less than $100,000 6. $2 million to less than $5 million 2. $100,000 to less than $250,000 7. $5 million to less than $10 million 3. $250,000 to less than $500,000 8. $10 million to less than $25 million 4. $500,000 to less than $1 million 9. $25 million to less than $50 million 5. $1 million to less than $2 million 10. $50 million or greater a. Federal Work 5 b. Non-Federal Work 7 c. Total Work 7 12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts. a. SIGNATURE b. DATE November 23rd, 2021 c. NAME AND TITLE Amir Kazeminia, PE, President + CEO C P Z TEAM ORGANIZATIONAL CHART CPZ ARCHITECTS, INC. 4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317 1601 BELVEDERE RD., S-350, WEST PALM BEACH, FL 33406 200 N. EL MAR DRIVE, SUITE 200, JENSEN BEACH, FLORIDA 34957 (954) 792-8525 AA# 26000685 WWW.CPZARCHITECTS. COM Structural Engineering Moffett & Nichol Larry DeRose, PE Ludovic Binner, PE City of Sunny Isles Beach Prime Professional / Team Leader CPZ Architects, Inc. Chris P. Zimmerman, AIA, NCARB President / Project Principal Jayson Hall, Senior Project Manager SBE /LEED GE Cost Estimating CMS – Construction Management Services, Dan Jeffreys SBE, MBE & CBE Mechanical, Electrical & Plumbing OCI Consultant Engineers Jason Smith, PE, LEED AP BD+C, CEM, Principal Kaz Kazeminia, NICET, Principal Amir Kazeminia, PEGal . LEED ACCREDITED PROFESSIONALS Fංඋൾ Sඍൺඍංඈඇ 50 SECTION 6 REFERENCES Client Length Scope Examples of Accomplishments City of Coral Springs (2006) 9500 West Sample Road Coral Springs, Florida 33065 John Barry, Deputy Fire Chief 954-346-1284 jbarry@coralsprings.org John Norris, Director of Public Works JNorris@coralsprings.org 954-344-1166 16 years & continuing A/E services 26 projects including 9 mill Police/Fire Facility Kwanis Park City Hall Urban Scape City Hall 2nd Fl Police Office City Hall 5th Fl renovation City Hall Programming Coral Spring Police Memorial Master Planning Services Charter School Arts Renovation Fire Station #64, #43 & 95 Aquatic Center meeting room Addition Aquatic Fitness Center Maintenance Facilities City of Tamarac (2006) Ron Stein, Construction Project Mgr. 954-597-3716 rstein@tamarac.org 15 years & Continuing A/E Services 23 projects including Village Park Review & Schematic Study Alazhar School Review City Hall needs’ assessment City Hall Commission Offices Sunset Veterans Park Architectural review’s various projects Water Treatment Plant Martin County (2020) 2555 SE Avenger Circle Stuart, FL 34996 (772) 320-3046 Jeff Dougherty, General Services Dept. jdougher@martin.fl.us Kevin Landry, Facilities Operations Administr klandry@martin.fl.us 1 year & Continuing Building Architect Fire Stations #14 & #18 K-9 Dog Kennel Facility Feasibility Study Building Envelope Commission Chambers Courthouse Improvements Administration 2nd - 4rd Fl. renovations Sheriff Purchasing Storage Building Data Recovery Center Marine Patrol Building Stuart Beach Ocean Rescue Building Admin Building Parks Offices Admin Veterans Affairs Landfill Admin Building City of Port St. Lucie (2019) 121 SW Port St. Lucie Port St. Lucie, Fl 34984 William T. May, Police Administrator (772) 871-5013 Bill.May@cityofpsl.com 2 years & Continuing Police Lobby Building Renovations Firing Range & Office expansion City of Port St. Lucie (2019) 2195 SE Airoso Road Port St. Lucie, Fl 34984 Mike Kendrick, Parks Operations Manager (772) 871-526 MKendrick@cityofpsl.com 2 years & Continuing Whispering Pines Park Minsky Gym Sportsman Park Building Parks Yard Building renovations Botanical Gardens Sculpture Public Works Study 12. NAME 13. ROLE IN THIS CONTRACT 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE b. WITH CURRENT FIRMa. TOTAL 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) 15. FIRM NAME AND LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 2 a. b. c. d. (1) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED PROFESSIONAL SERVICES e.Check if project performed with current firm(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 19. RELEVANT PROJECTS (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED (3) Chris P. Zimmerman Principal 38 19 CPZ Architects, Inc. Carnegie-Mellon University Bachelar of Architecture Architect: Florida, #10,995 North Carolina #9716 Louisiana #6826 NCARB CertificationFlorida AIA: American Institute of Architects (1) TITLE AND LOCATION (City and State) 2018 TBD Delray Beach Police Department Assessment Study, Delray Florida The City of Delray Beach Police Department hired CPZ to complete a needs and assessment study of their existing Police Department Facilities to determine if the existing building could be renovated or based on the results of the assessment report build a new Police Facility. CPZ Architects has completed a needs basement of the Delray Beach Police Station outlining their current needs and providing an estimate of the future space needs for the next 10 years. A conceptual master plan was developed for two possible solutions to their space needs along with budgetary estimates. Option 1 included using the existing facility and expanding around the facility along with construction of parking garage. The second option was to construct a completely new multi-story facility on the back part of the site, while maintaining operation in the existing facility. Upon competition of the new facility, demolish the existing facility and construct the new parking garage. CPZ Architects has now been retained to provide a needs assessment for the City Hall and Community Center Site. 2018 2019 Broward County Consulting Services for Consolidated Facilities Maintenance Building 2017 TBD City of Coral Springs City Hall Programming, Coral Springs, Florida CONSTRUCTION (If applicable) 2019 2023 BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm The Delray Beach City Hall and Community Center Needs Assessment is a study project, in conjunction with Carnahan, Proctor and Cross. We are the space study entity of the project where CPC will provide the Survey of the existing facility. We are directed to define the current use of the facility then determine the future needs of the Complex as it stands today or the potential of consolidating the current users and additional users into a City Center concept. New 365 Car Garage. The Port Everglades Department of Broward County intends to construct a new facility to consolidate Port Facilities Maintenance and Operations from the current functions that are located within various buildings throughout the Port Everglades campus into a central location. This Project is intended to locate this new facility within the physical boundary of Port Everglades on property currently owned by Broward County. Design, permitting, and construction of the Project is intended to take place in phases. The first phase will be the programming phase. The second phase will be the design and preparation of construction documents and permitting phase. The third phase will be the construction of the facility during such a time that construction activities won’t interrupt port operations, including but not limited to, traffic, taxi movement and staging, stores truck staging and movement and other vehicle operation that could potentially impact the port’s ability to service its clients and maritime operations. X CPZ Architects worked with the City of Coral Springs to create program projections, evaluate the prospect of public and private partnerships, and develop a multi-facility redevelopment plan for the relocation of the city’s City Hall. CPZ created a questionnaire to review the needs, both present and projected, for each of the city’s departments. Utilizing existing building drawings, we created a diagrammatic plan depicting department office layouts and zoning. The City is still working with this information to determine the feasibility of relocating and redevelopment. Delray Beach City Hall Assessment Study, Delray Florida (1) TITLE AND LOCATION (City and State) Port St. Lucie Needs Assessments, Port St, Lucie , Florida 2009 2009 A complete assessment of 10 acre Port Saint Lucie Public Works Facility was conducted. This includes four buildings encompassing the administration offices, vehicle repair, vehicle canopies, central stores and warehouse space. The City provided all the current and future staffing needs, as well as all equipment. We reviewed the current spaces provide for all activities to development a matrix of staff and space requirements. A complete site survey and environmental assessment was completed. This provided a current and accurate based to develop the redevelopment of the facility. The finish floor elevations of all buildings were recorded and compared to the current flood maps for the County to determine if potential flooding was a concern. All buildings were structurally reviewed for the ability to resist current wind loads. The evaluation resulted in the replacement of the existing buildings so allow them to function after an emergency event.The new site plan considered all of the assessment findings and allowed for the development of a secure, essential facility and an efficient layout fhe complex. 12. NAME 13. ROLE IN THIS CONTRACT 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 14. YEARS EXPERIENCE b. WITH CURRENT FIRM 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization) 15. FIRM NAME AND LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 2 a. b. c. d. PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) e. 19. RELEVANT PROJECTS (2) YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) (2) YEAR COMPLETED (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Jayson Hall Senior Project Manager a. TOTAL 19 17 CPZ Architects, Inc. Florida Atlantic University Bachelor of Architecture- 5 years NA National Council of Architectural Registration, Sunrise Chamber of Commerce (1) TITLE AND LOCATION (City and State) 2010 2022 CPZ Architects Inc. was retained to provide master planning and harden their Existing Public Works Building for the City of Coral Springs. The existing Public Works Building is a metal building that does not meet current hurricane code. Since this is a public works facility the city needed to keep this facility in operation at all times. The most economical way to keep this facility in operation is to design a new building in another location on the site. Based on the city’s funding and budget the project was designed in phases. Cost: $25 million 2019 2023 (1) TITLE AND LOCATION (City and State) (1) TITLE AND LOCATION (City and State) X (1) TITLE AND LOCATION (City and State) 2008 2010 The main goals of the project were to have a new two-story Administrative Building of approximately 12,500 sq ft designed as an “Essential Facility” and to meet “LEED standards” taking advantage of natural lighting and introducing Solar Energy Systems. This Building contains Labs and a Control Room that overlooks the plant operations and is proposed to be directly connected to the tanks and filtrations systems through overhead walkways/ bridges. The city wanted to redevelop the entire site with new building structures for the Administration offices and several accessory buildings to the Water Treatment plant in a way that its operation is not affected during construction. $35 million. Tamarac Control Building, City of Tamarac, Florida Westside Maintenance Facility Master Plan, Coral Springs, Florida Westside Fire Administration & Fire Rescue , Coral Springs, Florida (1) TITLE AND LOCATION (City and State) 2019 2023The existing building and proposed building additions will be designed as an essential facility to withstand 210 mph wind loads. This building will serve as an EOC during a hurricane event. The entire building will be on a 100% emergency back-up generator to run the building for 72 hours continuous during a state of emergency. The site has been designed to accommodate fire rescue trucks and semi-trucks. A concrete apron will be designed at exterior ends of the Fire truck repair bays. There are also fire truck parking located at NW corner of the site. Parking is provided for visitors and Fire Administration and Fire Academy at East side (Main entrance) of the building, and parking for Fleet and Central Stores are along the west, north and south side of the building and overflow parking. Reconfiguration of handicapped parking at main entrance. Highway & Bridge Maintenance Div Admin Building Expansion, Broward County, Fl Scope to includes design to expand the administrative building by 5,500 sq feet. Phases consist of pre-design- programming and schematic design. Other projects for Broward County Jayson is working on are the Restrooms for West Lake Park, Tree Tops Park, Markham Park and Trade winds Park and playgrounds for Ty park and West Lake Park. Coral Springs Public Safety Complex, City of Coral Springs, Florida Comprehensive 3-phase renovation, expansion and hurricane hardening of existing 60,000 SF facility, including new 2-story, 11,000 SF addition for state-of-the-art Emergency Management and Fire Department operations. Project involved complete reconfiguration of the complex’s 7-acre site to expand parking space and provide new site security and emergency generator system. Phase III involved 3 floors of tenant improvements and upgrading the building with new automatic sprinkler and HVAC systems. New facilities also include a 9,800-square foot LEED Certified Gold Fire Station, the only one of its kind in Broward County. $8 million EXPERIENCE Ludovic Binner is a senior structural engineer with experience in structural design, wind frame analysis, calculations, special inspections, and construction administration for projects in the United States and France. He has worked on a variety of projects including multi-level hotels and resorts, educational facilities, community centers, sports arenas, park facilities, performing arts buildings, and marine facilities structures. Ludovic is experienced has experience as a project manager on both private and public sector work, leading intensive coordination between engineering disciplines, consultants, and clients. REPRESENTATIVE PROJECT EXPERIENCE City of Coral Springs, Public Safety Building and Fire Station, Coral Springs, FL. Project structural engineer for design of an expansion of and addition to a three-story building incorporating structural hardening to comply with emergency operation center uprated wind design criteria. Responsibilities included structural analysis of the existing structure combined with hardening system and other alterations; design and proportioning of gravity and lateral load capacity versus increased demand for programmed use and hurricane event; designed lightweight composite deck, structural steel framing, and rooftop superstructures; prepared project specifications and construction drawings; provided various engineering services during construction, including response to RFIs, shop drawing review, coordination meetings, repair sketches, recommendations, and special inspections. Tasks included constructing new prestressed joists and concrete decks including infill floors, replacing light frame curtain wall with reinforced masonry, and strengthening structural steel roof framing and decking. City of Weston, Emergency Operations Building, Weston, FL. Structural engineer for the design of a new three-story, 21,600-square-foot municipal building that hosts a range of public services including building and zoning, code enforcement, fire marshal, fire code services, information technology, and city personnel offices. Design elements included reinforced concrete masonry walls, prestressed concrete floor, and roof joists with concrete floor and roof slabs, including housing chillers and emergency generators. Broward County, Edgar P. Mills Multi-Purpose Center and Garage, Fort Lauderdale, FL. Structural engineer for the design of a 50,000-square-foot, three-story facility and 87,500-square-foot, 324-car, three-story parking structure. The building houses Broward County Social Services Departments, which aids the elderly, families, veterans, and those most at risk. The project received LEED Silver certification. Broward County, Central Broward Regional Park, Lauderhill, FL. Structural engineer for a 5,000-seat, multi-purpose stadium and entertainment complex, aquatic facilities, and soccer fields with various supporting recreational fields/courts and pavilions. Responsibilities included design for the bleacher foundation and overhang canopy structure for the cricket stadium. Port Everglades Terminal 4 Parking Garage and Pedestrian Bridge, Fort Lauderdale, FL. Senior structural engineer/engineer-of-record for the parking garage and project manager for design services during construction and special inspections. The project EDUCATION MS, Civil Engineering, Ecole Nationale Supérieure des Arts et Industries de Strasbourg, France (INSA – Strasbourg), 2001 AS, Engineering, University of Paris VII, Paris France, 1997 REGISTRATION Professional Engineer: Florida, #72274, 2011 Ludovic Binner, PE Structural Engineer Ludovic Binner, PE Structural Engineer 2 consists of a five-level (providing for two-level addition), 162,240-square-foot post- tension concrete framed garage. The project also includes a 700-foot elevated steel framed box-girder truss pedestrian bridge. Two external flyover vehicular ramps provide express entering and exiting to the garage’s second level. Access to the Port secured area is provided through a standalone checkpoint structure. The building was designed to Florida Building Code (FBC) 2017 and was intended to be a ParkSmart certified building. Direct expansion (DX) variable refrigerant flow (VRF) technology was selected for the pedestrian bridge building and outdoor air preconditioning for its compact air handlers with remote condensing units for efficient temperature and humidity control. Bridge is conditioned with two equal capacity VRF systems, each serving half of the bridge. Outdoor air is cooled and dehumidified in dedicated outdoor air units (DOAU). Two DOAU and condensing units are at each end of the bridge. Preconditioned outdoor air is delivered to each side of the bridge to satisfy the code ventilation requirements and keep the building positively pressurized. Forced supply and exhaust ventilation systems were provided for the ground floor ground transportation area to control vehicular emissions. All exterior equipment has the necessary product approvals and is fastened/anchored to satisfy FBC, Building High- Velocity Hurricane Zone Requirements. Building management system (BMS) is installed to control and monitor heating, ventilation, and air conditioning (HVAC); lighting; and security systems. The system consists of high-speed peer-to-peer network off direct digital controllers (DDC) and operator workstation residing and communicating on a NATIVE BCAnet IP network system. Controls systems are connected to the County ethernet system. Threshold inspections tools include use of tablet with construction management web application to access construction documents and reports. Nova Southeastern University, Oceanography Research Center, Dania Beach, FL. Project structural engineer for over-water structure, marina seawall, and docks replacement. Responsibilities included design and proportioning of prestressed concrete composite structure; design and proportioning of mildly reinforced and prestressed seawall panels and pilings; review of design criteria for compliance with specific requirements for docking and mooring facilities; interdisciplinary project coordination and preparation of construction drawings; and providing various engineering services during construction, including response to RFIs, shop drawing review, coordination meetings, repair sketches, and recommendations and special inspections. Structural scope included installation of 600 linear feet of new seawall and construction of 21,000 square feet of over-water structure along the Intracoastal Water Way, replacement of 1,100 linear feet of marina basin seawall, and bulkhead with reconfiguration of tie-back system. The entire project included a new four-story laboratory and classroom building that couples with the marina to create a state-of-the- art academic facility. The marina includes all berth side utilities, state-of-the-art information systems integration, and outdoor classroom appointments. There are also cranes for loading and unloading large specimens or equipment for the larger research vessels. City of Weston Community Center, Weston, FL. Structural engineer-of-record for multi- purpose building housing state-of-the-art performing arts auditorium, flexible meetings rooms, art spaces, banquets halls, and support offices. Outside features include covered outdoor stage, drive-through porte cochere, public restrooms, security gate, chillers, and generator plant. EXPERIENCE Lawrence (Larry) DeRose has more than 40 years of marine, structural, and civil engineering consulting experience in South Florida with an emphasis on port, marine, structural, land development, and terminal projects, from planning to construction certification. Larry’s professional background includes all levels of experience in his areas of specialization, ranging from the most basic to management of complex projects, and in a broad variety of studies involving the practical applications of hydrology, hydraulics, fluid mechanics, and structural mechanics. He is experienced in all aspects of planning and directing studies that involve large- and small-scale site development for government planning programs, including feasibility, construction, and development. Larry also has extensive experience in the regulatory aspects of land use, underground pipeline construction, and practical applications of structural materials. He is a qualified expert witness and has testified before a number of government agencies and in court on a broad range of matters related to his professional specialization. These projects have been conducted throughout the entire eastern half of the United States, as well as in the West Indies, Virgin Islands, and the Bahamas. REPRESENTATIVE PROJECT EXPERIENCE Coral Springs Public Safety Complex, Coral Springs, FL. Principal-in-charge/structural engineer for the reconfiguration and structural hardening of an existing 60,000-square- foot safety complex, located on a 7-acre site, that includes a new LEED-certified fire station building, police station, two-story addition, and parking area. Services for the included structural, civil, mechanical, electrical, plumbing, fire protection, and life safety engineering, as well as energy modeling and commissioning. The new 12,500-square- foot fire station incorporates recycled materials throughout its build. It is the first LEED-certified building for the City of Coral Springs and serves as a showcase to educate residents of all ages about environmental sustainability. This facility includes a full commercial grade kitchen, dining room, entertainment room, gym, outdoor patio, and living quarters for the 24-hour station staff. This facility’s four bays include a decontamination room, cascade oxygen room, medical storage, and other emergency accommodation services. The addition of a two-story, 13,000-square-foot emergency management facility and fire department administration offices were designed with the latest energy-saving technologies and equipment. Scope of work included site improvements, an 8-inch water line extension, grading, an 8-inch gravity sewer, and a water management plan implementation to bring the site up to current surface water management standards and regulations. City of Weston, Emergency Operation Center, Weston, FL. Principal-in- charge/structural engineer for the design of a new three-story, 21,000-square-foot building that will accommodate 40 employees from fire code services, fire marshal, building and zoning, code enforcement and information technology departments. Services included structural, civil, mechanical, electrical, plumbing, fire protection, and life safety engineering. Structural design elements include reinforced concrete masonry walls, pre-stressed concrete floor and roof joists, concrete floor and roof slabs. Building systems included plumbing, fire protection systems, HVAC with two air-cooled chillers, electrical systems, lightning protection system, technology systems (AV, security, EDUCATION BE, Engineering, Stevens Institute of Technology, 1973 REGISTRATION Professional Engineer: Florida (20169) CERTIFICATIONS State Certified Threshold Building Inspector AFFILIATIONS Member, Fellow, American Society of Civil Engineering Member, Post Tensioning Institute Lawrence DeRose, PE Southeast Ports Lead Lawrence (Larry) DeRose, PE Southeast Ports Lead 2 telecommunications, closed circuit television system), standby generator and diesel fuel tank system. Site work includes water and sewer piping connections, storm water, asphalt paving for parking and driveways, and concrete paving. City of Boca Raton Public Works Maintenance and Administration Complex, Boca Raton, FL. 20-acre site for all city operations, including administration for the parks, public works, and engineering departments. The facility provides outdoor storage and loading for parks department-related landscape, soil, and hardscape. The complex also houses the city maintenance garage with the usual appointments for support of the mechanics. Larry provided Engineering Project Management for all buildings and site Structural, Electrical, Mechanical, and Fire Protection. Broward County Edgar P. Mills Multi-Purpose Center, Fort Lauderdale, FL. Principal- in-charge/structural engineer for design of a three-story 50,000-square-foot facility, a three-story parking garage that accommodates 324 vehicles, an outdoor covered eating area and covered walkways. The center houses Broward County social services departments that provide assistance to the elderly, families, veterans, and those most at risk, by providing case management, emergency assistance, substance abuse treatment and counseling, family planning, financial assistance, housing assistance, health care and dental services clinics, and a dispensing pharmacy operated by the Broward County Health Department. The building received LEED Silver certification. Greater Fort Lauderdale/Broward County Convention Center Expansion, Fort Lauderdale, FL. Provided structural and civil engineering services for the addition of 50,000 square feet of exhibition space with 180-foot elevated steel trusses. To support convention growth throughout South Florida, the space created more meeting rooms, larger pre-function space in the grand lobby, new administrative offices, and an elevated, climate-controlled pedestrian skywalk on the second floor leading to the parking garage. Broward County South Regional Library, Pembroke Pines, FL. Principal-in- charge/structural engineer for the two-story library that serves both the citizens of Broward County and the students of Broward Community College’s South Campus. It is the first LEED-certified building in Broward County. The library exterior is of pre- cast and pre-stressed pigmented concrete tilt wall construction. Its design is aesthetically unique, and its floor systems are specifically created to accommodate the heavy stacking loads associated with books and periodicals housed in the library. Port Everglades Operations Center and Harbormaster Tower, Fort Lauderdale, FL. Principal-in-charge/structural engineer for the nine-story modern lighthouse-like building that offers a panoramic 270-degree view of the 2,190-acre stretch of waterways that make up Port Everglades and its surrounding communities. The operations center, designed to remain functioning in post-disaster situations, is equipped with the latest technology in radar and security systems to monitor and operate all the port’s navigable waters and berthing facilities. It boasts hurricane resistance strength and full stand-by and backup power. a. (1) TITLE AND LOCATION (City and State) Village of Palm Springs Police Building Due Diligence Report Palm Springs, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES Current CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm Project Manager + Electrical EOR + Senior Electrical Engineer | Due Diligence Report of Village of Palm Springs Police Department's will include a site visit to evaluate the condition of existing electrical systems, a report of findings such as general condition, MEP engineer’s opinion of overall serviceability/longevity as well as recommendation for remedial repair or replacement. b. (1) TITLE AND LOCATION (City and State) Palm Beach Sheriff's Office Headquarters Annex Due Diligence Report Palm Beach, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm Project Manager + Electrical EOR + Senior Electrical Engineer | Assessment & Feasibility Report of the existing space includes a site visit to evaluate the condition of existing electrical systems, a report of findings such as general condition, MEP engineer’s opinion of overall serviceability/longevity as well as recommendation for remedial repair or replacement and a probable cost estimate. e. (1) TITLE AND LOCATION (City and State) School District of Palm Beach County West Technical Education Center Feasibility Study Belle Glade, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) 2019 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm Project Manager + Electrical EOR + Senior Electrical Engineer | Assessment & Feasibility Report of the existing space includes a site visit to evaluate the condition of existing electrical systems, a report of findings such as general condition, MEP engineer’s opinion of overall serviceability/longevity as well as recommendation for remedial repair or replacement and a probable cost estimate. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Sudharma Wijegunawardana, PE, LEED AP, LC Principal + Division Director West Palm Beach 13. ROLE IN THIS CONTRACT Project Manager + Electrical Engineer of Record (EEOR) 14. YEARS EXPERIENCE a. TOTAL 20 b. WITH CURRENT FIRM 17 15. FIRM NAME AND LOCATION (City and State) OCI Associates, Inc., West Palm Beach, Florida 16. EDUCATION (Degree and Specialization) Master of Science, Electrical Engineering, University of South Florida 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer Florida #63143 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training, Awards, etc.) Sudharma has served as Project Manager for 20 county and government projects and has led as project manager for 7 site assessments and feasibility studies for government, public safety and educational facilities. She is currently the project manager for the Village of Palm Springs Police Building Due Diligence Report and St. Lucie County Library Port Branch Assessment. Sudharma will serve as your Project Manager and Electrical Engineer of Record for your The City's Space Needs Assessment & Feasibility Studies. 19. RELEVANT PROJECTS d. (1) TITLE AND LOCATION (City and State) Department of Military Affairs West Palm Beach District Court of Appeal Renovation Palm Beach, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES Current CONSTRUCTION (If applicable) Current (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm Project Manager + Electrical EOR + Senior Electrical Engineer | Due Diligence Report and Assessment evaluation of existing electrical systems, a report of findings for general condition, MEP engineer’s opinion of overall serviceability/longevity as well as recommendation for remedial repair or replacement and a probable cost estimate to turn into a Readiness Center for the US National Guard. c. (1) TITLE AND LOCATION (City and State) St. Lucie County Library Port Branch Assessment Port St. Lucie, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2021 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm Electrical EOR + Senior Electrical Engineer | Our report will pertain to the 6,000 SF existing library building includes evaluation of existing electrical systems, a report of findings such as general condition, MEP engineer’s opinion of overall serviceability/longevity as well as recommendation for remedial repair or replacement and a probable cost estimate. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Jason Smith, PE, LEED AP BD+C, CEM Principal + Director of Mechanical Engineering 13. ROLE IN THIS CONTRACT Mechanical Engineer of Record (MEOR) 14. YEARS EXPERIENCE a. TOTAL 32 b. WITH CURRENT FIRM 28 15. FIRM NAME AND LOCATION (City and State) OCI Associates, Inc., Maitland, Florida 16. EDUCATION (Degree and Specialization) Bachelor of Science, Electrical Engineering, University of Central Florida 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer Florida #57743 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training, Awards, etc.) Jason is a Certified Energy Manager and LEED Accredited Professional for Building Design and Construction. He has served as the Mechanical Engineer of Record (MEOR) on 283+ government projects including The City Halls, Police Departments, County Libraries, and various Public Safety and Municipal facilities. Jason is currently the MEOR for the Village of Palm Springs Police Building Due Diligence Report and will serve as the Mechanical Engineer of Record for your City's Space Needs Assessment & Feasibility Studies. 19. RELEVANT PROJECTS e. (1) TITLE AND LOCATION (City and State) Osceola County West Command Center Feasibility Study Kissimmee, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm Mechanical EOR | An assessment of the existing mechanical systems to convert an old abandoned Publix into a new $5.5 Million command center to provide a report of findings such as general condition, MEP engineer’s opinion of overall serviceability/longevity as well as recommendation for remedial repair or replacement. a. (1) TITLE AND LOCATION (City and State) Village of Palm Springs Police Building Due Diligence Report Palm Springs, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES Current CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm Mechanical EOR | Due Diligence Report of Village of Palm Springs Police Department's will include a site visit to evaluate the condition of existing mechanical systems, a report of findings such as general condition, MEP engineer’s opinion of overall serviceability/longevity as well as recommendation for remedial repair or replacement. b. (1) TITLE AND LOCATION (City and State) Department of Military Affairs West Palm Beach District Court of Appeal Renovation Palm Beach, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES Current CONSTRUCTION (If applicable) Current (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm Mechanical EOR | Due Diligence Report and Assessment includes evaluation of existing mechanical systems, a report of findings such as general condition, MEP engineer’s opinion of overall serviceability/longevity as well as recommendation for remedial repair or replacement and a probable cost estimate to turn into a Readiness Center for the US National Guard. c. (1) TITLE AND LOCATION (City and State) Florida Highway Patrol Orlando International Drive Facility Orlando, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm Mechanical EOR | Due Diligence Report and Assessment of the existing building mechanical systems that support an existing two-story building located at 11059 International Drive, Orlando. Our report will only pertain to existing systems related to building for a possible purchase by the Florida Highway Patrol. d. (1) TITLE AND LOCATION (City and State) Florida Highway Patrol Troop D Station Facility Assessment Orlando, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm Mechanical EOR | With Department of management Services (DMS). Cocoa HQ Building Roof Replacement 10,400 SF Existing building needs a lightening protection evaluation of existing mechanical systems, a report of findings such as general condition, MEP engineer’s opinion of overall serviceability/longevity as well as recommendation for remedial repair or replacement. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Jason Diehl, PE Senior Mechanical Engineer 13. ROLE IN THIS CONTRACT Senior Mechanical Engineer 14. YEARS EXPERIENCE a. TOTAL 19 b. WITH CURRENT FIRM 11 15. FIRM NAME AND LOCATION (City and State) OCI Associates, Inc., Maitland, Florida 16. EDUCATION (Degree and Specialization) Bachelor of Science, Electrical Engineering, University of Central Florida 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer Florida #57743 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training, Awards, etc.) Jason's experience includes the design, production, quality control, and coordination of engineering projects for 40+ government and municipal projects including The City Halls, Courthouses, Police Departments, Fire Stations and other public safety projects. He is currently working on the Village of Palm Springs Police Building Due Diligence Report and the City of Hollywood Police Headquarters, and will serve as the Senior Mechanical Engineer for your City's Space Needs Assessment & Feasibility Studies. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Village of Palm Springs Police Building Due Diligence Report Palm Springs, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES Current CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm Senior Mechanical Engineer | Due Diligence Report of Village of Palm Springs Police Department's will include a site visit to evaluate the condition of existing mechanical systems, a report of findings such as general condition, MEP engineer’s opinion of overall serviceability/ longevity as well as recommendation for remedial repair or replacement. c. (1) TITLE AND LOCATION (City and State) Florida Highway Patrol Orlando International Drive Facility Orlando, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm Project Manager + Senior Mechanical Engineer | Due Diligence Report and Assessment of the existing building mechanical systems that support an existing two-story building located at 11059 International Drive, Orlando. Our report will only pertain to existing systems related to building for a possible purchase by the Florida Highway Patrol. d. (1) TITLE AND LOCATION (City and State) Florida Highway Patrol Troop D Station Facility Assessment Orlando, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm Project Manager + Senior Mechanical Engineer | With Department of management Services (DMS). Cocoa HQ Building Roof Replacement 10,400 SF Existing building needs a lightening protection evaluation of existing mechanical systems, a report of findings such as general condition, MEP engineer’s opinion of overall serviceability/longevity as well as recommendation for remedial repair or replacement. b. (1) TITLE AND LOCATION (City and State) Department of Military Affairs West Palm Beach District Court of Appeal Renovation Palm Beach, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES Current CONSTRUCTION (If applicable) Current (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm Senior Mechanical Engineer | Due Diligence Report and Assessment includes evaluation of existing electrical systems, a report of findings such as general condition, MEP engineer’s opinion of overall serviceability/longevity as well as recommendation for remedial repair or replacement and a probable cost estimate to turn into a Readiness Center for the US National Guard. e. (1) TITLE AND LOCATION (City and State) City of Hollywood Police Headquarters Hollywood, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES Current CONSTRUCTION (If applicable) Est. 2024 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm Senior Mechanical Engineer | 4-Story facility includes all functions including training and gun range, property and evidence, quartermaster, patrol, holding cells, detective units, recruitment, administration and public information; includes a 110,000 SF parking structure to support 350 vehicles. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Kaz Kazeminia, NICET Principal + Director of Plumbing & Fire Protection 13. ROLE IN THIS CONTRACT Director of Plumbing & Fire Protection 14. YEARS EXPERIENCE a. TOTAL 24 b. WITH CURRENT FIRM 24 15. FIRM NAME AND LOCATION (City and State) OCI Associates, Inc., Maitland, Florida 16. EDUCATION (Degree and Specialization) American University, Washington DC 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) NICET 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training, Awards, etc.) Kaz has over 24 years of experience in the design of Plumbing and Automatic Fire Sprinkler systems for government facilties. He has been involved in over 150 designs for government projects including The City Halls, Police Departments, County Libraries, and various Public Safety and Municipal facilities. Kaz is currently working on the St. Lucie County Library Port Branch Assessment and the Village of Palm Springs Police Due Diligence Report and will serve as the Director of Plumbing & Fire Protection for your City's Space Needs Assessment & Feasibility Studies. 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) Village of Palm Springs Police Building Due Diligence Report Palm Springs, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES Current CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm Director of Plumbing & Fire Protection | Due Diligence Report of Village of Palm Springs Police Department's will include a site visit to evaluate the condition of existing plumbing & fire protection systems, a report of findings such as general condition, MEP engineer’s opinion of overall serviceability/longevity as well as recommendation for remedial repair or replacement. c. (1) TITLE AND LOCATION (City and State) San Francisco International Airport GBAS Feasibility Study San Francisco, California (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm Director of Plumbing & Fire Protection | GBAS Feasibility Study to evaluate the condition of existing plumbing & fire protection systems, a report of findings such as general condition, MEP engineer’s opinion of overall serviceability/longevity as well as recommendation for remedial repair or replacement and a probable cost estimate. d. (1) TITLE AND LOCATION (City and State) United States GSA Chambers Courthouse Study San Francisco, California (2) YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm Director of Plumbing & Fire Protection | Courthouse Feasibility Study includes a site visit to evaluate the condition of existing plumbing & fire protection systems, a report of findings such as general condition, MEP engineer’s opinion of overall serviceability/longevity as well as recommendation for remedial repair or replacement and a probable cost estimate e. (1) TITLE AND LOCATION (City and State) San Francisco International Airport Superbay Study San Francisco, California (2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm Director of Plumbing & Fire Protection | Superbay Hangar Door Brake Feasibility Study to evaluate the condition of existing plumbing & fire protection systems, a report of findings such as general condition, MEP engineer’s opinion of overall serviceability/longevity as well as recommendation for remedial repair or replacement and a probable cost estimate. b. (1) TITLE AND LOCATION (City and State) Department of Military Affairs West Palm Beach District Court of Appeal Renovation Palm Beach, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES Current CONSTRUCTION (If applicable) Current (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm Director of Plumbing & Fire Protection | Due Diligence Report and Assessment includes evaluation of existing electrical systems, a report of findings such as general condition, MEP engineer’s opinion of overall serviceability/longevity as well as recommendation for remedial repair or replacement and a probable cost estimate to turn into a Readiness Center for the US National Guard. E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Art Munns, CxA Director of Building Commissioning 13. ROLE IN THIS CONTRACT Director of Building Commissioning 14. YEARS EXPERIENCE a. TOTAL 36 b. WITH CURRENT FIRM 9 15. FIRM NAME AND LOCATION (City and State) OCI Associates, Inc., Maitland, Florida 16. EDUCATION (Degree and Specialization) Mechanical Design and Assembly, Massanutten Technical Center, Harrisonburg, VA 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) CxA #514-1170 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training, Awards, etc.) Art has over 35 years of experience in mechanical engineering production, project management, energy modeling, and building commissioning (LEED fundamental & LEED enhanced). He has recently completed assessments and studies for government projects including Okeechobee Sheriff's Office Assessment and Okeechobee Co Health Department HVAC Feasibility Report and will serve as the Director of Building Commissioning for your City's Space Needs Assessment & Feasibility Studies. 19. RELEVANT PROJECTS b. (1) TITLE AND LOCATION (City and State) Okeechobee Sheriff's Office Jail Assessment & Report Okeechobee, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm Project Engineer - Mechanical | Site visit and assessment of the existing systems at the existing 112,000 SF jail in preparation of a renovation and expansion to the facility provide a report of our findings such as general condition, MEP engineer’s opinion of overall serviceability/longevity as well as recommendation for remedial repair or replacement of the existing systems. a. (1) TITLE AND LOCATION (City and State) Osceola County West Command Center Feasibility Study Kissimmee, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm Project Manager + Director of Building Commissioning | An assessment of the existing MEP/FP systems to convert an old abandoned Publix into a new $5.5 Million command center for Osceola County. Our scope required a site visit to evaluate the condition of the existing systems to convert the 26,000 SF space into a new Command Center to support the West side of the county. c. (1) TITLE AND LOCATION (City and State) Okeechobee Co Health Department HVAC Feasibility Report Okeechobee, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm Project Engineer - Mechanical | Site visit and reports of the existing systems to include recommendations for remedial repairs including but not limited to replacement of units and conditioning mechanical spaces in attics or replace all units with an air-cooled chiller with AHU’s and VAV system. d. (1) TITLE AND LOCATION (City and State) The City of Jupiter The City Hall Cx Jupiter, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES Current CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm Project Manager + Director of Building Commissioning | OCI’s Cx team will provide “Fundamental” Building Commissioning services in accordance with guidelines as outlined by AABC Commissioning Group. OCI is designing the MEP/FP/ITS/AV/Cx engineering to the 41,500-square-feet The City Hall. e. (1) TITLE AND LOCATION (City and State) City of Hollywood Police Headquarters Cx Hollywood, Florida (2) YEAR COMPLETED PROFESSIONAL SERVICES Current CONSTRUCTION (If applicable) Est. 2024 (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm Project Manager + Director of Building Commissioning | 4-Story facility includes all functions including training and gun range, property and evidence, quartermaster, patrol, holding cells, detective units, recruitment, administration and public information; includes a 110,000 SF parking structure to support 350 vehicles. AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (1/2004) PAGE 1 j E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT (Complete one Section E for each key person.) 12. NAME Dan Jeffreys 13. ROLE IN THIS CONTRACT Senior Cost Estimator 14. YEARS EXPERIENCE a. TOTAL 35 b. WITH CURRENT FIRM 16 15. FIRM NAME AND LOCATION (City and State) CMS-Construction Management Services, Inc. – Deerfield Beach, FL 33441 16. EDUCATION (DEGREE AND SPECIALIZATION) University of North Florida – Construction Management University of Florida – Architecture Program 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) N/A 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) N/A 19. RELEVANT PROJECTS a. (1) TITLE AND LOCATION (City and State) City of Sunrise – Sunrise Senior Center Renovation and Addition Sunrise, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Description: Renovation and Addition to Center which includes parking lot expansion, a new exercise room, a new craft room, a new media room, renovated kitchen area with new equipment, and a garden area that has a room with glass- paneled walls, featuring living walls, or vertical gardens, waist-high plants, and a computer room and exercise room. Size: Building Addition Size = 2,200 SF Cost: $2,584,490.00 Scope of Work: Schematic Design / Design Development / Construction Documents Cost Estimating b. (1) TITLE AND LOCATION (City and State) Sunrise Public Safety Building - Community Meeting Room Addition & Site Improvements Sunrise, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2015 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Description: New Meeting Room addition and site improvements (new pump room, painting canopy, refurbish fountain) Size: Meeting Room = 865 SF; Site Improvements = 5,000 SF Cost: $863,594.00 Scope of Work: Design Development / Construction Documents Cost Estimating c. (1) TITLE AND LOCATION (City and State) City of Miami Beach – Police Headquarters – Visitors Parking Garage Miami Beach, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Description: New Addition to existing Parking Garage Size: Project Site Size = 46,415.00 SF (New Added Area) Cost: $11,320,752.00 Scope of Work: Order of Magnitudes Cost Estimating d. (1) TITLE AND LOCATION (City and State) Miami-Dade County Internal Services Department ‒ Mental Health Facility Renovation Miami, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Description: Buiildout/Rehabilitation/Renovation of existing 7-story facility for defendants too mentally unstable to stand trial on criminal charges Size: Project Site Size = 214,382 SF; Building = 181,324 SF Cost: $39,184,118.00 Scope of Work: Schematic Design / Design Development / Construction Document Cost Estimating Continued… AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (1/2004) PAGE 2 e. (1) TITLE AND LOCATION (City and State) Apotex Florida Expansion – Phases A, B and C Miramar, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Description: Interior buildout; addition of an entire floor to the existing building Size: Project Site Size = 165,400 SF Cost: $24,999,989.00 Scope of Work: Construction Documents Cost Estimating f. (1) TITLE AND LOCATION (City and State) City of Lake Worth – Beach Complex Casino Building Lake Worth, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Description: Renovation of existing oceanfront municipal park including casino building, new service area, new swimming pool, new drop-off area, new stage area, new maintenance facility, parking lots/parking garage, new stair elevator tower Size: 13 Acres Cost: Five different schemes ranging from $18,161,285.00 to $59,015,031.00 Specific Role: Order of Magnitude Cost Estimating g. (1) TITLE AND LOCATION (City and State) City of Coral Springs – Westside Maintenance Facility Coral Springs, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Description: Addition of a second story to the existing one-story, 50,026 SF Vehicle Maintenance Facility with Central Storages/Offices and Parking Lot; includes sitework, utilities, lighting, and landscaping Size: Phase 1 – Central Stores/Offices = 17,741 SF; Phase 2 – Maintenance Facility Addition = 26,000 SF; Parking Lot = 27,345 SF) Cost: $28,471,800.00 Scope of Work: Order of Magnitude / Construction Documents Cost Estimating h. (1) TITLE AND LOCATION (City and State) Broward County – West Regional Courthouse (Phase II) – Clerk of Courts, Civil & Marriage Plantation, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Description: Interior renovation (buildout) of existing space which includes demolition and installation of new floors, ceilings, ballistic-resistant windows, painting, replacing of furniture, doors, carpeting, fire extinguishers, HVAC, and adjusting Mechanical / Electrical / Plumbing to reflect the new layout of space Size: 11,600 SF Cost: $1,686,039.00 Specific Role: Construction Cost Estimating I. (1) TITLE AND LOCATION (City and State) Miami-Dade College – Eduardo J. Padrón Campus Plaza (Building 6000, Remodeling of Vacant Floors 11, 12, 14 & 15) for Classrooms and Administrative Offices (Phases II & III) Miami, FL (2) YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) N/A (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Description: Buildout/Remodel of Floors 11, 12, 14 & 15 for future classrooms with administrative offices on 11th floor Size: Each floor = 11,260 SF Cost: $9,271,693.00 (Floor #11 = $2,251,397.00; Floor #12 = $2,214,058.00; Floor #14 = $2,273,960; Floor #15 = $2,532,279.00) Scope of Work: Conceptual Schematic / Design Development / Construction Documents Cost Estimating 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1)FIRM NAME CPZ Architects, Inc (2)FIRM LOCATION (City and State) Plantation, Florida (3)ROLE Architect b. (1)FIRM NAME MUEngineers, Inc.. (2)FIRM LOCATION (City and State)(3)ROLE Structural Engineer c. (1)FIRM NAME Keith Team (2)FIRM LOCATION (City and State) Pompano Beach, Florida (3)ROLE Civil, Landscape & Survey d. (1)FIRM NAME (2)FIRM LOCATION (City and State) Fort Lauderdale, Florida (3)ROLE Geotechnical e. (1)FIRM NAME CMS (2)FIRM LOCATION (City and State) Deerfield Beach, Florida (3)ROLE Cost Estimator The Port Everglades Department of Broward County intends to construct a new facility to consolidate Port Facilities Maintenance and Operations from the current functions that are located within various buildings throughout the Port Everglades campus into a central location. This Project is intended to locate this new facility within the physical boundary of Port Everglades on property currently owned by Broward County. Design, permitting, and construction of the Project is intended to take place in phases. The first phase will be the programming phase. The second phase will be the design and preparation of construction documents and permitting phase. The third phase will be the construction of the facility during such a time that construction activities won’t interrupt port operations, including but not limited to, traffic, taxi movement and staging, stores truck staging and movement and other vehicle operation that could potentially impact the port’s ability to service its clients and maritime operations. Consultant shall prepare and provide a programming and recommendations report as a standalone document. This document shall define and outline the facility’s needs as a part of design services and shall be used to determine the size of the facility, number of rooms, spaces, uses and operational adjacencies, employee and port/county vehicle parking, specialized equipment parking and storage, including, but not limited to, listing and compiling all equipment anticipated and needed to operate the facility in an efficient and effective way. The location of the facility will also be reviewed and recommended after evaluation of the various available sites throughout the Port campus. F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 1 a. PROJECT OWNER 21. TITLE AND LOCATION (City and State) b. POINT OF CONTACT NAME 23.PROJECT OWNER'S INFORMATION 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Broward County 2019 2023 John Foglesong, P.E., Dir. Seaport En. & Const. c. POINT OF CONTACT TELEPHONE NUMBER Broward County Consulting Services for Consolidated Facilities Maintenance Building 954-468-0142 Terracon Oakland Park, Florida $35 Million F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) a. PROJECT OWNER 21. TITLE AND LOCATION (City and State) 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 20. EXAMPLE PROJECT KEY NUMBER a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. POINT OF CONTACT NAME 23. PROJECT OWNER'S INFORMATION (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) CPZ Architects was retained to renovate an existing building for their new vehicle maintenance building for the City of Coral Springs. The renovation of the existing vehicle maintenance building includes the following: Demolition of existing Westside Vehicle Maintenance Building (Metal Building). This site is planned for a future parking garage equipped with a car wash. (4150 NW 120th Avenue) The proposed building will be designed to serve as the new Westside Vehicle Maintenance Facility. The proposed 72,394 SF building will be designed to house Fire Administration, Fleet, Central Stores, City Clerk Storage, and HR Storage.• Fleet: The proposed new 30,552 SF, 2-story Fleet area includes offices forfuture Fleet employees, restrooms, reception area, lobby, storage rooms,conference room, copy rooms, and break room. This area also includes a garagearea and is equipped with (8) car bays, small engine repair bay, (3) Fire TruckBays, EMS Truck Bay, Motorcycle Bay, Alignment Bay, parts storage, offices,media rooms, break room, storage rooms, and locker rooms. The primaryfunction of this portion of the building is for Fleet vehicle repair garage andFleet Administration. c. POINT OF CONTACT TELEPHONE NUMBER 2 Coral Springs Westside Maintenance Facility Master Plan City of Coral Springs John Norris, Director of Public Works 2018 2022 CPZ Architects Architect MUEngineers, Inc.Structural Engineer Delta G Engineering MEP CMS-Construction Management Services, Inc.Cost Estimator Terracon Consulting Fort Lauderdale, FL Geotechnical Engineer Plantation, FL Oakland Park, FL Fort Lauderdale, FL Deerfield Beach, FL g (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) Chen Moore Fort Lauderdale, Fl Civil, Landscape Stoner & Associates Davie, Fl Survey ED+A Stuart, FL Acousticsh. (1) FIRM NAME 954-344-1166 (2) FIRM LOCATION (City and State)(3) ROLE • Central Stores: The proposed new 9,277 SF, 2-story Central Stores area includes open office area for future Central Stores employees,restroom, conference room, Fleet Pick-up Counter, EMS Storage, mezzanine storage, warehouse storage, and loading docks. The primaryfunction of this portion of the building is for the city’s Central Stores. The existing building and proposed building additions will be designed as an essential facility to withstand 210 mph wind loads. This building will serve as an EOC during a hurricane event. The entire building will be on a 100% emergency back-up generator to run the building for 72 hours continuous during a state of emergency. The site has been designed to accommodate fire rescue trucks and semi-trucks. A concrete apron will be designed at exterior ends of the Fire truck repair bays. There are also fire truck parking located at NW corner of the site. Parking is provided for visitors and fire administration at East side (Main entrance) of the building, and parking for Fleet and Central Stores are along the west, north and south side of the building and overflow parking. Reconfiguration of handicapped parking at main entrance. A new flag pole area with brick pavers will be added to the building’s main entrance area. The site drainage will be redesigned around the entire site. $20 Million F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) a. PROJECT OWNER 21. TITLE AND LOCATION (City and State) 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 20. EXAMPLE PROJECT KEY NUMBER a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. POINT OF CONTACT NAME 23. PROJECT OWNER'S INFORMATION (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) 22.YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) CPZ Architects was retained to renovate an existing building for their new Fire Administration and Fire Academy Building for the City of Coral Springs. The renovation of the existing building includes the following:1.Demolition of existing Vehicle Maintenance Building (Building). This site is for a future parking garage equipped with a car wash.2.(4150 NW 120th Avenue) The approximate 72,394 SF building will be designed to house Fire Administration, Fire Academy, FireTraining, Fleet, Central Stores, City Clerk Storage, and HR Storage. See spatial layout below for the Fire Administration and FireAcademy. c. POINT OF CONTACT TELEPHONE NUMBER 3 Coral Springs Westside Fire Administration and Fire Academy Building City of Coral Springs John Barry, Deputy Chief 2018 2022 CPZ Architects Architect MUEngineers, Inc.Structural Engineer Delta G Engineering MEP CMS-Construction Management Services, Inc.Cost Estimator Terracon Consulting Fort Lauderdale, FL Geotechnical Engineer Plantation, FL Oakland Park, FL Fort Lauderdale, FL Deerfield Beach, FL g (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) Chen Moore Fort Lauderdale, Fl Civil, Landscape Stoneer & Associates Davie, Fl Survey ED+A Stuart, FL Acousticsh. (1) FIRM NAME 954-612-7638 (2) FIRM LOCATION (City and State)(3) ROLE $25 Million The existing building and proposed building additions will be designed as an essential facility to withstand 210 mph wind loads. This building will serve as an EOC during a hurricane event. The entire building will be on a 100% emergency back-up generator to run the building for 72 hours continuous during a state of emergency. The site has been designed to accommodate fire rescue trucks and semi-trucks. A concrete apron will be designed at exterior ends of the Fire truck repair bays. There are also fire truck parking located at NW corner of the site. Parking is provided for visitors and Fire Administration and Fire Academy at East side (Main entrance) of the building, and parking for Fleet and Central Stores are along the west, north and south side of the building and overflow parking. Reconfiguration of handicapped parking at main entrance. A new flagpole area with brick pavers will be added to the building’s main entrance area. The site drainage will be redesigned around the entire site. 20. EXAMPLE PROJECT KEY NUMBER 4 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (if Applicable) 2019 23. PROJECT OWNER’S INFORMATION a.PROJECT OWNER City of Delray Beach b.POINT OF CONTACT NAME Dan Tintner c. POINT OF CONTACT TELEPHONE NUMBER 954-972-3959 ext. 150 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1)FIRM NAME CPC South Florida. (2)FIRM LOCATION (City and State) Deerfield Beach, Florida (3)ROLE Engineer b. (1)FIRM NAME CPZ Architects, Inc. (2)FIRM LOCATION (City and State) Plantation, Florida (3)ROLE Architect c. (1)FIRM NAME MUEngineers, Inc. (2)FIRM LOCATION (City and State) Oakland Park, Florida (3)ROLE Structural Engineer The Delray Beach City Hall and Community Center Needs Assessment is a study project, in conjunction with Carnahan, Proctor and Cross. We are the space study entity of the project where CPC will provide the Survey of the existing facility. We are directed to define the current use of the facility then determine the future needs of the Complex as it stands today or the potential of consolidating the current users and additional users into a City Center concept. New 365 Car Garage. F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACTQU(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) Delray Beach City Hall Assessment Study Delray Beach, Florida 20. EXAMPLE PROJECT KEY NUMBER 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (if Applicable) 2019 23. PROJECT OWNER’S INFORMATION a.PROJECT OWNER City of Delray Beach b.POINT OF CONTACT NAME Dan Tintner c. POINT OF CONTACT TELEPHONE NUMBER 954-972-3959 ext. 150 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUQUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) Delray Beach Police Department Assessment Study Delray Beach, Florida 20. EXAMPLE PROJECT KEY NUMBER 5 21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (if Applicable) 2019 23. PROJECT OWNER’S INFORMATION a.PROJECT OWNER City of Delray Beach b.POINT OF CONTACT NAME Dan Tintner c. POINT OF CONTACT TELEPHONE NUMBER 954-972-3959 ext. 150 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUQUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) Delray Beach Police Department Assessment Study Delray Beach, Florida The City of Delray Beach Police Department hired CPZ to complete a needs and assessment study of their existing Police Department Facilities to determine if the existing building could be renovated or based on the results of the assessment report build a new Police Facility. CPZ Architects has completed a needs basement of the Delray Beach Police Station outlining their current needs and providing an estimate of the future space needs for the next 10 years. A conceptual master plan was developed for two possible solutions to their space needs along with budgetary estimates. Option 1 included using the existing facility and expanding around the facility along with construction of parking garage. The second option was to construct a completely new multi-story facility on the back part of the site, while maintaining operation in the existing facility. Upon competition of the new facility, demolish the existing facility and construct the new parking garage. CPZ Architects has now been retained to provide a needs assessment for the City Hall and Community Center Site. a. (1)FIRM NAME CPC South Florida. (2)FIRM LOCATION (City and State) Deerfield Beach, Florida (3)ROLE Engineer b. (1)FIRM NAME CPZ Architects, Inc. (2)FIRM LOCATION (City and State) Plantation, Florida (3)ROLE Architect c. (1)FIRM NAME MUEngineers, Inc. (2)FIRM LOCATION (City and State) Oakland Park, Florida (3)ROLE Structural Engineer 20. EXAMPLE PROJECT KEY NUMBER 22. YEAR COMPLETED CONSTRUCTION (if Applicable) 23. PROJECT OWNER’S INFORMATION a.PROJECT OWNER b.POINT OF CONTACT NAME 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUQUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 6 22. YEAR COMPLETED CONSTRUCTION (if Applicable) 2009 23. PROJECT OWNER’S INFORMATION a.PROJECT OWNER City of Coral Springs b.POINT OF CONTACT NAME Larry Staneart 24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUQUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 21. TITLE AND LOCATION (City and State) CPZ Architects worked with the City of Coral Springs to create program projections, evaluate the prospect of public and private partnerships, and develop a multi-facility redevelopment plan for the relocation of the city’s City Hall. CPZ created a questionnaire to review the needs, both present and projected, for each of the city’s departments. Utilizing existing building drawings, we created a diagrammatic plan depicting department office layouts and zoning. The City is still working with this information to determine the feasibility of relocating and redevelopment. a. (1)FIRM NAME (3)ROLE CPZ Architects, Inc. (2)FIRM LOCATION (City and State) Plantation, Florida Architect City of Coral Springs City Hall Programming Coral Springs Professional Services 2009 b.b. PPOOIINT NT OF CONTACT PHONE NUMBER 954-3444-1014 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1)FIRM NAME CPZ Architects, Inc. (2)FIRM LOCATION (City and State) Plantation, Florida (3)ROLE Architect b. (1)FIRM NAME ML Engineering, Inc. (2)FIRM LOCATION (City and State) Vera Beach, Florida (3)ROLE Structural Engineer c. (1)FIRM NAME Kamm Consulting, Inc. (2)FIRM LOCATION (City and State) Fort Pierce, Florida (3)ROLE MEP Engineer d. (1)FIRM NAME Bowman Consultants (2)FIRM LOCATION (City and State) Martin County, Florida (3)ROLE Civil Engineers e. (1)FIRM NAMETerracon Engineers (2)FIRM LOCATION (City and State)Fort Lauderdale, Florida (3)ROLE Geo Technical f. (1)FIRM NAME WGI Engineering (2)FIRM LOCATION (City and State)Fort Lauderdale, Florida (3)ROLE Landscape Architecture g. (1)FIRM NAME Fuller-Armfield-Wagner (2)FIRM LOCATION (City and State)(3)ROLE Real Estate Analysis F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) a. PROJECT OWNER 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 20. EXAMPLE PROJECT KEY NUMBER b. POINT OF CONTACT NAME 23. PROJECT OWNER'S INFORMATION c. POINT OF CONTACT TELEPHONE NUMBER 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) 7 A complete assessment of 10 acre Port Saint Lucie Public Works Facility was conducted. This includes four buildings encompassing the administration offices, vehicle repair, vehicle canopies, central stores and warehouse space. The City provided all the current and future staffing needs, as well as all equipment. We reviewed the current spaces provide for all activities to development a matrix of staff and space requirements. A complete site survey and environmental assessment was completed. This provided a current and accurate based to develop the redevelopment of the facility. The finish floor elevations of all buildings were recorded and compared to the current flood maps for the County to determine if potential flooding was a concern. All buildings were structurally reviewed for the ability to resist current wind loads. The evaluation resulted in the replacement of the existing buildings so allow them to function after an emergency event. The new site plan considered all of the assessment findings and allowed for the development of a secure, essential facility and an efficient layout for the complex. 21.TITLE AND LOCATION (City and State)Port St. Lucie Needs Assessment Facility Port St. Lucie, Florida 2020 2021 Port St. Lucie Roger Jacob 772-334-4220 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) a. PROJECT OWNER 21. TITLE AND LOCATION (City and State) 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 20. EXAMPLE PROJECT KEY NUMBER a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) STANDARD FORM 330 (REV. 8/2016) PAGE 3 (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. POINT OF CONTACT NAME 23. PROJECT OWNER'S INFORMATION c. POINT OF CONTACT TELEPHONE NUMBER (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable)Tamarac Water Treatment Building City of Tamarac The main goals of the project were to have a new two-story Administrative Building of approximately 12,500 sq ft designed as an “Essential Facility” and to meet “LEED standards” taking advantage of natural lighting and introducing Solar Energy Systems. This Building contains Labs and a Control Room that overlooks the plant operations and is proposed to be directly connected to the tanks and filtrations systems through overhead walkways/ bridges. In addition to the main Administrative building CPZ will assist Engineering consultants in designing the exteriors for new Motor Control, Fluoride and NaOCL Buildings on the site. The city wanted to redevelop the entire site with new building structures for the Administration offices and several accessory buildings to the Water Treatment plant in a way that its operation is not affected during construction. Therefore the project is designed to be built in two phases: 1.The new building will be built on a location that does not require the demolition of the existing infrastructure in Phase 1. 2.The Existing Building will be demolished and Site work will begin as all operations transfer to new Admin Building. The location of the project in proximity to residential neighborhoods of the City of Tamarac gives and excellent opportunity for the project to be designed as a City Landmark that incorporates the building elements of the City’s existing architecture. 8 2019 2022 Ron Stein 954-597-3716 CPZ Architects Plantation, Florida Architect Eckler Engineering Water Treatment, Water Distribution WGI Structural, MEP, Civil LandscapeArchitecture Terracon Consulting Fort Lauderdale, Florida Geotechnical Avirom & Associates Boca Raton, Florida Survey CMS Deerfield Beach, Florida Cost Coral Springs, Florida West Pallm Beach, Florida F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) a. PROJECT OWNER 21. TITLE AND LOCATION (City and State) 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 20. EXAMPLE PROJECT KEY NUMBER a. b. c. d. e. f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. POINT OF CONTACT NAME 23. PROJECT OWNER'S INFORMATION (3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State) 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) CPZ Architects was retained by Broward County under a continuing contract to provide programming and schematic design services. CPZ provided a detailed programming report that included a questionnaire for the building users and with the questionnaire produced a needs assessment chart. CPZ then provided a spatial interactionary block diagram of the building users which led into schematic design. Once a floor plan option was selected by the County, CPZ provided an opinion of cost. The opinion of cost exceeded the CCA guideline limit and the County had to put the project on hold. c. POINT OF CONTACT TELEPHONE NUMBER (954) 357-6460 9 Highway & Bridge Maintenance Div Admin Building Expansion Broward County, Fl Broward County Ahmad Ali 2016 2019 CPZ Architects Architect MUEngineers, Inc.Structural Engineer Osborn Engineering MEP CMS Cost Estimator Plantation, FL Oakland Park, FL Fort Lauderdale, FL Deerfield Beach, FL (3) ROLE(2) FIRM LOCATION (City and State) Chen Moore Fort Lauderdale, Fl Civil, Landscape Design Management Services Fort Lauderdale, Fl LEED g (1) FIRM NAME Terracon Consultants, I GeotechnicalFort Lauderdale, FL $2.5 Million F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) a. PROJECT OWNER 21. TITLE AND LOCATION (City and State) 25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) 20. EXAMPLE PROJECT KEY NUMBER a. (1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE b. POINT OF CONTACT NAME 23. PROJECT OWNER'S INFORMATION 22. YEAR COMPLETED PROFESSIONAL SERVICES CONSTRUCTION (If applicable) Since 2013, CPZ completed space plans for the computer company for the second floor of Building 1415 at Crown Center in Fort Lauderdale. These 34,000 square feet of space was laid out to divide meet the tenant’s needs of more space and departmental divisions. The potential tenant was looking to bring together into one space all of their departments thus reinforcing the corporate identity. The new space needs to accommodate the current staffing as well as anticipated growth for the next two fiscal years. The resulting plan created a central focal element to house the operations and tech squad centers with the other departments encircling this area. Each department has easy access to this central core as well as private conference rooms. Collaboration/relaxation areas are positioned along the edges of departments to encourage team building. Additionally, the plan allows for expansion as the business grows. c. POINT OF CONTACT TELEPHONE NUMBER (954)771-6714 10 Prolexic Space Plans, Fort Lauderdale, Florida Crown Center Jim Goldstein 2013 2013 CPZ Architects ArchitectPlantation, FL $2.5 Million TITLE OF EXAMPLE PROJECT (From Section F) G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS 1 2 3 4 5 6 7 8 9 10 STANDARD FORM 330 (REV. 8/2016) PAGE 4 26. NAMES OF KEY PERSONNEL (From Section E, Block 12) 27. ROLE IN THIS CONTRACT (From Section E, Block 13)1 2 3 4 5 6 7 8 9 10 29.EXAMPLE PROJECTS KEY NUMBER TITLE OF EXAMPLE PROJECT (From Section F)NUMBER 28. EXAMPLE PROJECTS LISTED IN SECTION F (Fill in "Example Projects Key" section below before completing table. Place "X" under project key number for participation in same or similar role.) Chris Zimmerman, AIA President Jayson Hall Senior Project Manager Larry DeRose, PE Senior Structural Engineer Ludovic Binner, PE Senior Project Manager Jason Smith, PE Principal Kaz Kazeminia Principal Amir Kazeminia PEG Dan Jeffreys Senior Cost Estimator Broward County Consulting Services for Consolidated Facilities Maintenance Building Coral Springs Westside Maintenance Facility Master Plan Coral Springs Westside Fire Administration and Fire Academy Building Delray Beach City Hall Assessment Study Delray Beach, Florida Delray Beach Police Department Assessment Study, Delray Beach Florida City of Coral Springs City Hall Programming Coral Springs Port St. Lucie Needs Assessment Facility, Port St. Lucie, Florida Tamarac Water Treatment Building Tamarac, Florida Highway & Bridge Maintenance Div Admin Building Expansion Broward County, Fl Prolexic Space Plans, Fort Lauderdale, Florida F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER ONE 21. TITLE AND LOCATION (City and State) Village of Palm Springs Police Building - Architectural Programming and Building Conditions Assessment Report, Lake Worth, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES Current CONSTRUCTION (If applicable) N/A 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER Village of Palm Springs B. POINT OF CONTACT NAME Sebastian Velazquez Feliu, Project Manager C. POINT OF CONTACT TELEPHONE NUMBER 561.655.2423 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) PROJECT SCOPE OCI Associates was selected as a sub-consultant to an Architectural firm to provide a Due Diligence Report and Building Conditions Assessment of an existing Police Station building located in Lake Worth. Our team members were required to provide a site visit and evaluate the following building systems; · Mechanical Systems · Electrical Systems · Plumbing Systems · Fire Protection Systems · Low Voltage Systems After the evaluation, our team provided a report of findings such as the general condition, MEP engineer’s opinion of overall serviceability and longevity as well as our recommendation for remedial repair or a completed replacement of the systems and a probable cost estimate. The report was provided to the Owner; Village of Palm Springs for them to determine the future needs of using the space for their employees. ROLE Mechanical, Electrical, Plumbing & Fire Protection, ITS Engineering Assessment KEY TEAM MEMBERS · Amir Kazeminia, PE | Principal in Charge* · Sudharma Wijegunawardana, PE, LEED AP, LC | Project Manager + EEOR* · Jason Diehl | Senior Mechanical Engineer* · Jason Smith, PE, LEED AP, BD+C, CEM | Mechanical Engineer of Record* · Kaz Kazeminia, NICET | Director of Plumbing & Fire Protection* · Nick Wilkie, Plumbing & Fire Protection* (*) The key team members from this project will be assigned to your contract a.(1) FIRM NAME OCI Associates, Inc. (2) FIRM LOCATION (City and State) Maitland, Florida (3) ROLE MEP/FP/ITS/AV Engineering b. (1) FIRM NAME OCI Associates, Inc. (2) FIRM LOCATION (City and State) West Palm Beach, Florida (3) ROLE Project Management + Electrical Engineering PROJECT RELEVANCY ✓Police Station ✓Secure Facility ✓Law Enforcement Owner ✓MEP/FP/ITS Systems Evaluation ✓Due Diligence Report ✓Existing Government Facility F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER TWO 21. TITLE AND LOCATION (City and State) Palm Beach Sheriff's Office Headquarters Annex - Architectural Programming and Building Conditions Assessment Report, Palm Beach, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) N/A 23. PROJECT OWNER’S INFORMATION A. PROJECT OWNER Palm Beach Sheriff's Office B. POINT OF CONTACT NAME Sebastian Velazquez Feliu, Project Manager C. POINT OF CONTACT TELEPHONE NUMBER 561.655.2423 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) PROJECT SCOPE OCI Associates was selected as a sub-consultant to an Architectural firm to provide a Due Diligence Report and Building Conditions Assessment of the existing Sheriff's Office headquarters building located in Palm Beach. Our team members were required to provide a site visit and evaluate the following systems; · Mechanical Systems · Electrical Systems · Plumbing Systems · Fire Protection Systems · Low Voltage Systems After the evaluation, our team provided a report of findings such as the general condition, MEP engineer’s opinion of overall serviceability and longevity as well as our recommendation for remedial repair or a completed replacement of the systems and a probable cost estimate. The report was provided to the Owner; Palm Beach Sheriff's Office for them to determine the future needs of using the space for their employees. ROLE Mechanical, Electrical, Plumbing & Fire Protection, ITS Engineering Assessment KEY TEAM MEMBERS · Amir Kazeminia, PE | Principal in Charge* · Sudharma Wijegunawardana, PE, LEED AP, LC | Project Manager + EEOR* · Jason Smith, PE, LEED AP, BD+C, CEM | Mechanical Engineer of Record* · Kaz Kazeminia, NICET | Director of Plumbing & Fire Protection* · Nick Wilkie, Plumbing & Fire Protection* (*) The key team members from this project will be assigned to your contract a.(1) FIRM NAME OCI Associates, Inc. (2) FIRM LOCATION (City and State) Maitland, Florida (3) ROLE MEP/FP/ITS/AV Engineering b. (1) FIRM NAME OCI Associates, Inc. (2) FIRM LOCATION (City and State) West Palm Beach, Florida (3) ROLE Project Management + Electrical Engineering PROJECT RELEVANCY ✓Sheriffs Headquarters ✓Secure Facility ✓Law Enforcement Owner ✓MEP/FP/ITS Systems Evaluation ✓Due Diligence Report ✓Existing Government Facility F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER THREE 21. TITLE AND LOCATION (City and State) Department of Military Affairs West Palm Beach District Court of Appeal Renovation, Due Diligence Report and Assessment, Palm Beach, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES Current CONSTRUCTION (If applicable) Current 23. PROJECT OWNER’S INFORMATION A. PROJECT OWNER Department of Military Affairs B. POINT OF CONTACT NAME Sebastian Velazquez Feliu, Project Manager C. POINT OF CONTACT TELEPHONE NUMBER 561.655.2423 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) PROJECT SCOPE OCI Associates was selected as a sub-consultant to an Architectural firm to provide a Due Diligence Report and Building Conditions Assessment of the existing District Court of Appeal building. Our team members were required to provide a site visit to the building and evaluate the following systems; · Mechanical Systems · Electrical Systems · Plumbing Systems · Fire Protection Systems · Low Voltage Systems After the evaluation, our team provided a report of findings such as the general condition, MEP engineer’s opinion of overall serviceability and longevity as well as our recommendation for remedial repair or a completed replacement of the systems and a probable cost estimate. The report was provided to the Owner; and led the team to move forward with a new job order from the Owner to renovate the existing space into a Readiness Center for the US National Guard; which OCI is currently designing the new replacement systems for the project. ROLE Mechanical, Electrical, Plumbing & Fire Protection, ITS Engineering Assessment KEY TEAM MEMBERS · Amir Kazeminia, PE | Principal in Charge · Sudharma Wijegunawardana, PE, LEED AP, LC. | Project Manager + Electrical Engineer of Record · Jason Smith, PE, LEED AP, BD+C, CEM | Mechanical Engineer of Record · Jason Diehl | Senior Mechanical Engineer · Kaz Kazeminia, NICET | Director of Plumbing & Fire Protection · Nick Wilkie, Plumbing & Fire Protection The key team members from this project will be assigned to your contract a.(1) FIRM NAME OCI Associates, Inc. (2) FIRM LOCATION (City and State) Maitland, Florida (3) ROLE MEP/FP/ITS/AV Engineering b. (1) FIRM NAME OCI Associates, Inc. (2) FIRM LOCATION (City and State) West Palm Beach, Florida (3) ROLE Project Management + Electrical Engineering PROJECT RELEVANCY ✓Justice Center ✓Secure Facility ✓Federal Government Owner ✓MEP/FP/ITS Systems Evaluation ✓Due Diligence Report ✓Existing Government Facility F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER FOUR 21. TITLE AND LOCATION (City and State) Florida Highway Patrol - Orlando International Drive Facility Architectural Programming and Building Conditions Assessment Report, Orlando, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) 2019 23. PROJECT OWNER’S INFORMATION A. PROJECT OWNER Florida Highway Patrol B. POINT OF CONTACT NAME Christopher Sorvillo, Captain C. POINT OF CONTACT TELEPHONE NUMBER 954-914-3515 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) PROJECT SCOPE OCI Associates was selected as a sub-consultant to an Architectural firm to provide a Due Diligence Report and Building Condition Assessment of an existing building located at 11059 International Drive, Orlando. Our team members were required to provide a site visit to the two-story building and evaluate the following systems; · Mechanical Systems · Electrical Systems · Plumbing Systems · Fire Protection Systems · Low Voltage Systems After the evaluation, our team provided a report of findings such as the general condition, MEP engineer’s opinion of overall serviceability and longevity as well as our recommendation for remedial repair or a completed replacement of the systems and a probable cost estimate. The report was provided to the Owner; Florida Highway Patrol for them to determine the future needs of using the space for their employees. ROLE Mechanical, Electrical, Plumbing & Fire Protection, ITS Engineering Assessment KEY TEAM MEMBERS · Amir Kazeminia, PE | Principal in Charge · Jason Diehl | Project Manager + Senior Mechanical Engineer · Jason Smith, PE, LEED AP, BD+C, CEM | Mechanical Engineer of Record The key team members from this project will be assigned to your contract a.(1) FIRM NAME OCI Associates, Inc. (2) FIRM LOCATION (City and State) Maitland, Florida (3) ROLE MEP/FP/ITS/AV Engineering b. PROJECT RELEVANCY ✓Florida Highway Patrol ✓Secure Facility ✓Law Enforcement Owner ✓MEP/FP/ITS Systems Evaluation ✓Due Diligence Report ✓Existing Government Facility F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER FIVE 21. TITLE AND LOCATION (City and State) Osceola County West Command Center - Architectural Programming and Building Conditions Assessment Report, Kissimmee, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) N/A 23. PROJECT OWNER’S INFORMATION A. PROJECT OWNER Osceola County B. POINT OF CONTACT NAME Conrad Ballance Project Manager Tim Wagoner, Architectural Project Manager C. POINT OF CONTACT TELEPHONE NUMBER 407-742-0525 407-093-9389 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) PROJECT SCOPE OCI Associates was selected as a sub-consultant to an Architectural firm to provide a Due Diligence Report and Building Conditions Assessment of an abandoned big box retail space to convert it into a $5.5 million West Command Center for the growing West region in the county. Our team members were required to provide a site visit to the building and evaluate the following systems; · Mechanical Systems · Electrical Systems · Plumbing Systems · Fire Protection Systems · Low Voltage Systems After the evaluation, our team provided a report of findings such as the general condition, MEP engineer’s opinion of overall serviceability and longevity as well as our recommendation for remedial repair or a completed replacement of the systems and a probable cost estimate. The report was provided to Osceola County for them to determine the future needs of using the space for their employees. ROLE Mechanical, Electrical, Plumbing & Fire Protection, ITS Engineering Assessment KEY TEAM MEMBERS · Amir Kazeminia, PE | Principal in Charge · Art Munns, CxA | Project Manager + Director of Building Commissioning · Jason Smith, PE, LEED AP, BD+C, CEM | Mechanical Engineer of Record The key team members from this project will be assigned to your contract a.(1) FIRM NAME OCI Associates, Inc. (2) FIRM LOCATION (City and State) Maitland, Florida (3) ROLE MEP/FP/ITS/AV Engineering b. PROJECT RELEVANCY ✓MEP/FP/ITS Systems Evaluation ✓Due Diligence Report ✓Existing Retail Facility F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER SIX 21. TITLE AND LOCATION (City and State) St. Lucie County - Port St. Lucie Branch Library Architectural Programming and Building Conditions Assessment Report, Port St. Lucie, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES 2021 CONSTRUCTION (If applicable) N/A 23. PROJECT OWNER’S INFORMATION A. PROJECT OWNER St. Lucie County B. POINT OF CONTACT NAME Scotty Beaulieu, Project Manager Rob Castrovinci,Architectural Project Manager C. POINT OF CONTACT TELEPHONE NUMBER 772-462-1432 | beaulieus@stlucieco.org 561.313.2021 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) PROJECT BACKGROUND Opened on December 1, 1971, the original 1,500 sq. ft. branch was constructed and donated to the County by the General Development Corporation. In 1981, the branch was expanded to 4,500 sq. ft. Approximately 150,000 people live within a 5-mile radius of the Prima Vista location. Popular from its inception, this tiny branch does high volume circulation and youth programming. The present building is structurally sound but worn and is increasingly outmoded. PROJECT SCOPE OCI Associates was selected as a sub-consultant to an Architectural firm to provide a Due Diligence Report and Building Conditions Assessment of an existing 6,000 -square-foot library to determine whether to expand the facility or build a new one. Our team members provided a site visit to the library and evaluate the following systems; · Mechanical Systems · Electrical Systems · Plumbing Systems · Fire Protection Systems After the evaluation, our team provided a report of our findings such as the general condition, MEP engineer’s opinion of overall serviceability and longevity as well as our recommendation for remedial repair or a completed replacement of the systems and a probable cost estimate. The report determined that the telecommunication cabling has been run as needed over the years but is inadequate for current needs. The Youth areas, stacks, community meeting room and staff areas are all inadequate and a new building has been determined as the best possible outcome for the district. ROLE Mechanical, Electrical, Plumbing & Fire Protection, Engineering Assessment KEY TEAM MEMBERS · Amir Kazeminia, PE | Principal in Charge · Sudharma Wijegunawardana, PE, LEED AP, LC | Electrical Engineer of Record · Jame Burchard | Project Manager a.(1) FIRM NAME OCI Associates, Inc. (2) FIRM LOCATION (City and State) Maitland, Florida (3) ROLE MEP/FP Engineering b. (1) FIRM NAME OCI Associates, Inc. (2) FIRM LOCATION (City and State) West Palm Beach, Florida (3) ROLE Electrical Engineering PROJECT RELEVANCY ✓MEP/FP Systems Evaluation ✓Due Diligence Report ✓Existing Community Facility F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER SEVEN 21. TITLE AND LOCATION (City and State) School District of Palm Beach County - West Technical Education Center Programming & Building Conditions Assessment & Report Belle Glade, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES 2021 CONSTRUCTION (If applicable) Ongoing 23. PROJECT OWNER’S INFORMATION A. PROJECT OWNER School District of Palm Beach County B. POINT OF CONTACT NAME Jorge Fuentes, Architectural Project Manager C. POINT OF CONTACT TELEPHONE NUMBER 561-655-2423 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) PROJECT SCOPE OCI Associates was selected as a sub-consultant to an Architectural firm to provide a Due Diligence Report and Building Conditions Assessment of a education center in Belle Glades. Our team members were required to provide a site visit to the building and evaluate the following systems; · Mechanical Systems · Electrical Systems · Plumbing Systems · Fire Protection Systems · Low Voltage Systems After the evaluation, our team provided a report of findings such as the general condition, MEP engineer’s opinion of overall serviceability and longevity as well as our recommendation for remedial repair or a completed replacement of the systems and a probable cost estimate. The report was provided to the School District of Palm Beach County for them to determine the future needs of using the space for their employees. ROLE Mechanical, Electrical, Plumbing & Fire Protection Engineering Assessment KEY TEAM MEMBERS · Amir Kazeminia, PE | Principal in Charge* · Sudharma Wijegunawardana, PE, LEED AP, LC | Project Manager + EEOR* · Jason Smith, PE, LEED AP, BD+C, CEM | Mechanical Engineer of Record* · Kaz Kazeminia, NICET | Director of Plumbing & Fire Protection* (*)The key team members from this project will be assigned to your contract a.(1) FIRM NAME OCI Associates, Inc. (2) FIRM LOCATION (City and State) Maitland, Florida (3) ROLE MEP/FP/ITS/AV Engineering b. (1) FIRM NAME OCI Associates, Inc. (2) FIRM LOCATION (City and State) West Palm Beach, Florida (3) ROLE Project Management + Electrical Engineering PROJECT RELEVANCY ✓MEP/FP/ITS Systems Evaluation ✓Due Diligence Report ✓Existing Facility F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER EIGHT 21. TITLE AND LOCATION (City and State) Okeechobee County Health Department HVAC Feasibility Report Okeechobee, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES 2021 CONSTRUCTION (If applicable) N/A 23. PROJECT OWNER’S INFORMATION A. PROJECT OWNER Okeechobee County B. POINT OF CONTACT NAME Donnie Oden, Facilities Director C. POINT OF CONTACT TELEPHONE NUMBER 813-763-0805 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) PROJECT SCOPE OCI Associates was selected as a sub-consultant to an Architectural firm to provide a Due Diligence Report and Building Conditions Assessment of a education center in Belle Glades. Our team members were required to provide a site visit to the building and evaluate the following mechanical spaces in attics or replace all units with an air-cooled chiller with AHU’s and VAV system. After the evaluation, our team provided a report of findings such as the general condition, MEP engineer’s opinion of overall serviceability and longevity as well as our recommendation for remedial repair or a completed replacement of the systems and a probable cost estimate. The report was provided to the County for them to determine the future needs of using the space for their employees. ROLE Mechanical Engineering Assessment KEY TEAM MEMBERS · Amir Kazeminia, PE | Principal in Charge* · Art Munns, CxA | Project Engineer - Mechanical* (*) The key team members from this project will be assigned to your contract a.(1) FIRM NAME OCI Associates, Inc. (2) FIRM LOCATION (City and State) Maitland, Florida (3) ROLE MEP/FP/ITS/AV Engineering b. PROJECT RELEVANCY ✓Mechanical Systems Evaluation ✓Due Diligence Report ✓Existing Community Facility F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER NINE 21. TITLE AND LOCATION (City and State) City of Hollywood Police Headquarters + Cx Hollywood, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES Current CONSTRUCTION (If applicable) Est. 2024 23. PROJECT OWNER’S INFORMATION A. PROJECT OWNER City of Hollywood B. POINT OF CONTACT NAME Heather Baburek Guenot, PE, Senior Project Manager C. POINT OF CONTACT TELEPHONE NUMBER 954-649-4389 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) BACKGROUND The City of Hollywood operates a full service police department for its 150,000 residents and over 100,000 annual visitors; the City’s voters recently approved a General Obligation Bond, which included funding to replace the current Police Headquarters Building with a new facility. The existing Police Headquarters Building is a four story approximately 76,040 SF facility, located at the SE corner of Hollywood Blvd and Park Road. The department currently has a total of 426 full time positions, both sworn and civilian employees. The current 1970’s police station is outdated and cramped and was approved by tax payers to design a new facility in 2020. PROJECT SCOPE The planned 4-story building will double the size of the existing police station incorporating much needed new technology that isn’t available on the current electrical grid. Features of the station will include a much larger property & evidence room, training and gun range, quartermaster, patrol, holding cells, detective units, recruitment, administration and public information for 425 employees with room to grow. A new structured parking for approximately 350 vehicles will be included in the project with a high first floor bay for large vehicle storage. SIZE 110,000 - 20,000 SF COST $72.5 Million ROLE Mechanical, Electrical, Plumbing & Fire Protection Engineering, Commissioning KEY TEAM MEMBERS · Amir Kazeminia, PE | Principal in Charge* · Jason Diehl | Senior Mechanical Engineer* · Art Munns, CxA | Project Manager + Director of Building Commissioning* (*)The key team members from this project will be assigned to your contract a.(1) FIRM NAME OCI Associates, Inc. (2) FIRM LOCATION (City and State) Maitland, Florida (3) ROLE MEP/FP/ITS/AV Engineering b.(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE PROJECT RELEVANCY ✓Police Station ✓Secure Facility ✓Law Enforcement Owner ✓MEP/FP/ITS Systems Design ✓Local to Sunny Isles Beach F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER TEN 21. TITLE AND LOCATION (City and State) Florida Highway Patrol Troop D Station Facility Assessment Orlando, Florida 22. YEAR COMPLETED PROFESSIONAL SERVICES 2019 CONSTRUCTION (If applicable) N/A 23. PROJECT OWNER’S INFORMATION A. PROJECT OWNER Florida Highway Patrol B. POINT OF CONTACT NAME Christopher Sorvillo, Captain C. POINT OF CONTACT TELEPHONE NUMBER 954-914-3515 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) PROJECT SCOPE OCI Associates was selected as a sub-consultant to an Architectural firm to provide a Due Diligence Report and Building Conditions Assessment of a 10,400 SF headquarters building roof replacement. Our team members were required to provide a site visit to the building and evaluate the following systems; · Lightning Protection Evaluation of the existing Mechanical Systems After the evaluation, our team provided a report of findings such as the general condition, MEP engineer’s opinion of overall serviceability and longevity as well as our recommendation for remedial repair or a completed replacement of the systems and a probable cost estimate. The report was provided to Florida Highway Patrol for them to determine the future needs of using the space for their employees. With Department of management Services (DMS). Cocoa HQ Building Roof Replacement 10,400 SF Existing building needs a lightening protection evaluation of existing mechanical systems, a report of findings such as general condition, MEP engineer’s opinion of overall serviceability/longevity as well as recommendation for remedial repair or replacement. ROLE Mechanical, Electrical, Plumbing & Fire Protection Engineering Evaluations KEY TEAM MEMBERS · Amir Kazeminia, PE | Principal in Charge* · Jason Diehl | Senior Mechanical Engineer* · Jason Smith, PE, LEED AP, BD+C, CEM | Mechanical Engineer of Record* (*)The key team members from this project will be assigned to your contract a.(1) FIRM NAME OCI Associates, Inc. (2) FIRM LOCATION (City and State) Maitland, Florida (3) ROLE Lightning Protection Engineering b.(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE c.(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE PROJECT RELEVANCY ✓Lightning Protection Evaluation ✓Due Diligence Report ✓Existing Commercial Facility AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (1/2004) PAGE 3 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 21. TITLE AND LOCATION (City and State) Miami-Dade County Internal Services Department - Mental Health Diversion Facility Renovation Miami, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES 2017 CONSTRUCTION (If applicable) N/A 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER Miami-Dade County c/o SBLM Architects, Inc. b. POINT OF CONTACT NAME Glenn Lurie, AIA LEED AP/Architect c. POINT OF CONTACT TELEPHONE NUMBER (305) 412-9187 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost.) Description: Buildout/Rehabilitation/Renovation of this seven-story facility for mentally ill defendants incapable to stand trial. Renovations will be to 1st floor for general and secured entry, administrative and security areas, courtroom(s), judicial areas and judicial support staff spaces, and space for day activity/vocational training purposes, including a new elevator to connect 1st and 2nd floors. The 2nd floor will be reconfigured to include a CSU, classroom/conference room space, and miscellaneous space for treatment and support services providers. The 3rd floor holds a mechanical area which will be renovated to meet current building code requirements. Patient rooms and support spaces located on floors 4th through 7th will be renovated for use as short-term residential treatment programs. All mechanical, plumbing, electrical, building management and fire safety system components must be upgraded, including but not limited to, fire alarm, sprinkler system, security system, fire protection, generator and storage tank, building management systems, and smoke evacuation systems. Existing elevators will be refurbished and modernized, paint in interior and exterior areas will be re-applied, and electrical and plumbing fixtures will be retrofitted and/or replaced as required. In addition, telecommunication and data requirements will be updated to meet the requirements of the County’s Information Technology Department (ITD). Exterior building openings are to be properly sealed/caulked as required and correctional-type components are to be removed as requested by the Agency. The existing parking lot is to be re-paved, re-stripped, and its site lighting upgraded. All damaged exterior glazing will be replaced, and new storm protection assembly will be provided. Door hardware, flooring, ceilings, finishes, and Mechanical, Electrical and Plumbing components will be replaced as required to accommodate the new programming requirements. Size: Project Site Size = 214,382 SF; Building = 181,324 SF Cost: $39,184,118.00 Scope of Work: Schematic Design / Construction Documents Cost Estimating 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME CMS-Construction Management Services, Inc. (2) FIRM LOCATION (City and State) 10 Fairway Drive Suite 301 Deerfield Beach, FL 33441 (3) ROLE Cost Estimating b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE d. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (1/2004) PAGE 4 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 21. TITLE AND LOCATION (City and State) Apotex Florida Expansion – Phases A, B and C Miramar, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) N/A 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER Apotex, Inc. Toronto, Canada b. POINT OF CONTACT NAME Dwight Trotter/Global Director, Capital Engineering c. POINT OF CONTACT TELEPHONE NUMBER 1-800 268-4623 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost.) Description: Interior buildout of the existing facility by adding another floor. Apotex Inc., the largest Canadian-owned pharmaceutical company, will create 150 full-time jobs in Broward County as part of a $184 million U.S. expansion. The company is developing a new research and development center and an advanced manufacturing and packaging facility in Miramar, which will serve as the U.S. headquarters for Apotex and offices for Apobiologix. Its U.S. offices are currently in Weston. Construction of the facility began in 2017 and is expected to be completed in early 2019. Size: Project Site Size = 165,400 SF Cost: $24,999,989.00 Scope of Work: Construction Documents Cost Estimating 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME CMS-Construction Management Services, Inc. (2) FIRM LOCATION (City and State) 10 Fairway Drive Suite 301 Deerfield Beach, FL 33441 (3) ROLE Cost Estimating b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (1/2004) PAGE 5 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 21. TITLE AND LOCATION (City and State) City of Lake Worth – Beach Complex Casino Building Lake Worth, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES 2018 CONSTRUCTION (If applicable) N/A 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Lake Worth, FL c/o CPZ Architects, Inc. b. POINT OF CONTACT NAME Mr. Chris P. Zimmerman, AIA – President c. POINT OF CONTACT TELEPHONE NUMBER (954) 792-8525 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost.) Description: On the shores of the Atlantic Ocean, newly reconstructed Lake Worth Casino Building and renovated Beach Complex officially opened to the public on March 1, 2013. The new casino building remains true to the original 1920's architecture; and while there is no gambling at the new building, the name "Casino" remains as a reminder of the history and importance of the building to the citizens of Lake Worth. In 2018 CMS provided Cost Estimating for the renovation of existing oceanfront municipal park including new casino building, service area, swimming pool, drop-off area, stage area, maintenance facility, parking lots/parking garage and stair elevator tower. Size: 13 Acres Cost: Five different schemes ranging from $18,161,285.00 to $59,015,031.00 Scope of Work: Order of Magnitude Cost Estimating 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME CMS-Construction Management Services, Inc. (2) FIRM LOCATION (City and State) 10 Fairway Drive, Suite 301 Deerfield Beach, FL 33441 (3) ROLE Cost Consulting / Cost Estimating b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (1/2004) PAGE 6 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 21. TITLE AND LOCATION (City and State) City of Coral Springs – Westside Maintenance Facility Coral Springs, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) N/A 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER City of Coral Springs, FL c/o CPZ Architects, Inc. b. POINT OF CONTACT NAME Mr. Chris P. Zimmerman, AIA President c. POINT OF CONTACT TELEPHONE NUMBER (954) 792-8525 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost.) 2014: Description: This project involved three Phases for the construction of a new Central Stores/Offices Building, a new Vehicle Maintenance Facility, and a new Parking Lot. Phase I – Construction of a new Central Stores/Offices (including Site Work) Phase II – Construction of a new Vehicle Maintenance Facility (including Site Work) Phase III – Construction of a new Parking Lot (including Site Work) Size: Vehicle Maintenance Facility = 16,900 SF; Central Stores/Offices Building Size = 17,7341 SF; Parking Lot = 27,345 SF Cost: Central Stores/Offices = $2,724,852.00; Maintenance Facility = $4,506,840.00; Parking Lot = $728,080.00 Specific Role: Order of Magnitude Cost Estimating 2018 -2020: CMS was asked again by CPZ Architects, Inc. of Plantation, Florida to provide an Order of Magnitude Cost Estimate for Coral Spring’s Westside Maintenance Facility Master Plan project which involved the interior demolition and buildout of the existing 50,026 SF, one-story Maintenance Facility, by the addition of a 26,000 SF second story. Also, included is sitework, utilities, lighting, paving, and landscaping. • Scope of Work: Order of Magnitude (2018) / Construction Documents Cost Estimating (2019-2020) • Total Probable Cost: $28,471,800.00 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME CMS-Construction Management Services, Inc. (2) FIRM LOCATION (City and State) 10 Fairway Drive, Suite 301 Deerfield Beach, FL 33441 (3) ROLE Cost Estimating AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (1/2004) PAGE 7 F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.) 20. EXAMPLE PROJECT KEY NUMBER 21. TITLE AND LOCATION (City and State) Broward County – West Regional Courthouse (Phase II) – Clerk of Courts, Civil & Marriage Plantation, FL 22. YEAR COMPLETED PROFESSIONAL SERVICES 2020 CONSTRUCTION (If applicable) N/A 23. PROJECT OWNER’S INFORMATION a. PROJECT OWNER Broward County, FL c/o CPZ Architects, Inc. b. POINT OF CONTACT NAME Michael Walkowski, Associate AIA, LEED GA / Project Manager c. POINT OF CONTACT TELEPHONE NUMBER (954) 792-8525 24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost.) Description: CMS was asked by CPZ Architects, Inc. of Plantation, Florida to provide Cost Estimates for the interior renovation (buildout) of the existing space of this courthouse which included demolition and installation of new floors, ceilings, ballistic-resistant windows painting, replacing of furniture, doors, carpeting, fire extinguishers, HVAC, and adjusting Mechanical/Electrical/Plumbing to reflect the new layout of space. Size: 11,600 SF Cost: $1,686,039.00 Specific Role: Construction Documents Cost Estimating 25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT a. (1) FIRM NAME CMS-Construction Management Services, Inc. (2) FIRM LOCATION (City and State) 10 Fairway Drive, Suite 301 Deerfield Beach, FL 33441 (3) ROLE Cost Estimating b. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE c. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE H. ADDITIONAL INFORMATION 31. SIGNATURE 32. DATE November 23rd, 2021 33. NAME AND TITLE Amir Kazeminia, PE President + CEO OCI ASSOCIATES, INC. Founded in 1987, OCI Associates, Inc. serves clients by providing mechanical, electrical (IT/AV), plumbing, fire protection engineering; commissioning services, and construction administration. We are headquartered in Orlando, with offices in Fort Pierce, West Palm Beach, Miami, Fort Myers, Tampa, Washington D.C., Baltimore, Norfolk, Dallas, and San Francisco. Current Law Enforcement Project Experience Palm Beach Sheriff’s Office new 25,250 SF, $6.9 Mil D1 & Marine Unit – West Palm Beach, Florida City of Greenacres 730 SF Public Safety EOC Conversion –Lake Worth, Florida City of Casselberry new 25,000 SF, $87 Mil Police Department – Casselberry, Florida The Village of Royal Palm Beach 19,000 SF, $6.5 Mil EOC & Palm Beach Sheriff’s Office Modification –Florida City of Hollywood new 120,000 SF, $72.5 Mil Police Headquarters and Parking Garage – Hollywood, Florida University of Florida new 36,000 SF, $25 Mil Public Safety Complex – Gainesville, Florida San Francisco International Airport US Customs & Border Protection Improvement – San Francisco, California San Francisco International Airport Terminal 1 Police Substation Renovation – San Francisco, California Completed Law Enforcement Project Experience Florida Highway Patrol Orlando I-Drive Facility Assessment - Orlando, Florida The City of Jupiter new 38,823 SF, $20 Mil Municipal Complex – Jupiter, Florida Palm Beach County Sheriff’s Office HQ Annex & EOC Due Diligence Report – West Palm Beach, Florida Ft. Myers Police Station HVAC System Evaluation & Report for Domestic Waste Replacement – Ft. Myers, Florida US Customs & Border Protection – Martin County Airport, Stuart, Florida Volusia County Sheriff's Office new 29,656 SF, $11.8 Mil Evidence Facility – Daytona Beach, Florida City of Winter Park new 79,000 SF, $8 Mil Public Safety Operations Center – Winter Park, Florida City of Palm Beach Gardens Veterans Plaza Expansion – West Palm, Florida US Customs & Border Protection new 4,545 SF, $4.3 Mil Facility – Boca Raton Aviation Authority, Florida City of Ft. Myers Police Department Upgrade – Ft. Myers, Florida US Customs & Border Protection new 76,000 SF Terminal at Orion Jet Center, Opa-Locka Executive Airport – Florida Volusia County Sheriff’s IT Building Upgrades – Daytona Beach, Florida City of Oviedo Public Safety Complex Upgrade – Oviedo, Florida City of Lake Worth Police Department Modifications – Lake Worth, Florida City of Winter Springs Police Department Addition – Winter Springs, Florida Hernando County Sheriff’s Department Administration Building – Brooksville, Florida City of Okeechobee Police Department – Okeechobee, Florida City of Ormond Beach Police Station – Ormond Beach, Florida City of Winter Haven Police Station – Winter Haven, Florida City of Auburndale Police Station – Auburndale, Florida Polk County Sheriff’s East Command Center – Lakeland, Florida City of Winter Springs Police Department – Winter Springs, Florida K-9 Training Facility – Florida Pඈඅංർൾ Sඍൺඍංඈඇ ൺඇൽ Fංඋൾ A ൽආංඇංඌඍඋൺඍංඈඇ SECTION 7 4316 W BROWARD BLVD PLANTATION, FL 33317 Current Principal Place of Business: Current Mailing Address: 4316 W BROWARD BLVD PLANTATION, FL 33317 Entity Name: CPZ ARCHITECTS, INC. DOCUMENT# P02000128253 FEI Number: 57-1140055 Certificate of Status Desired: Name and Address of Current Registered Agent: DELGADO, ANGELA 665 SE 10TH STREET 201 DEERFIELD BEACH, FL 33441 US The above named entity submits this statement for the purpose of changing its registered office or registered agent, or both, in the State of Florida. SIGNATURE: Electronic Signature of Registered Agent Date Officer/Director Detail : I hereby certify that the information indicated on this report or supplemental report is true and accurate and that my electronic signature shall have the same legal effect as if made under oath; that I am an officer or director of the corporation or the receiver or trustee empowered to execute this report as required by Chapter 607, Florida Statutes; and that my name appears above, or on an attachment with all other like empowered. SIGNATURE: Electronic Signature of Signing Officer/Director Detail Date ANGELA DELGADO FILED Mar 16, 2021 Secretary of State 1232801076CC CHRIS ZIMMERMAN PRESIDENT 03/16/2021 2021 FLORIDA PROFIT CORPORATION ANNUAL REPORT Yes 03/16/2021 Title DP Name ZIMMERMAN, CHRIS P Address 1961 SW 68 AVE City-State-Zip:PLANTATION FL 33317 Title SECRETARY Name ZIMMERMAN, KIM Address 4316 W BROWARD BLVD City-State-Zip:PLANTATION FL 33317 Bඈඒ Sർඈඎඍඌ ඈൿ A ආൾඋංർൺ ඈൿ Sඈඎඍඁ Fඅඈඋංൽൺ Nඈඇ Dൾඇඈආංඇൺඍංඈඇ Cඁൺඉൾඅ SECTION 8 C P Z CPZ ARCHITECTS, INC. 4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317 1601 BELVEDERE RD., S-350, WEST PALM BEACH, FL 33406 200 N. EL MAR DRIVE, SUITE 201B, JENSEN BEACH, FLORIDA 34957 (954) 792-8525 AA# 26000685 WWW.CPZARCHITECTS. COM CERTIFICATE OF INSURANCE CPZ Architects, Inc. 4316 West Broward Boulevard, Plantation, Florida 33317 1601 Belvedere Rd., S-350, West Palm Beach, Florida 33406 200 N. El Mar Drive, Suite 201B, Jensen Beach, Florida 33317 “Designing Quality Architecture That Builds Lasting Relationships” Thank You For The Opportunity!