HomeMy WebLinkAboutCPZ Architects Submittal RFQ 21-10-01 11-29-2021City of Sunny Isles Beach
Space Needs Assessment and Site Feasibility Study
RFQ #21-10-01 November 30, 2021
CPZ Architects, Inc.
4316 West Broward Boulevard, Plantation, Florida 33317
1601 Belvedere Rd., S-350, West Palm Beach, 33406
200 N. El Mar Drive, Suite 201, Jensen Beach, Florida 33317
Chris P. Zimmerman, AIA (954) 792-8525 Chris@cpzarchitects.com
“I want to personally thank you and your team. People cannot get
enough of how beautiful the building is. Your design was well
thought out. Not only is it beautiful but it is functional. Two very
important qualities. I truly appreciate your hard work and
passion.”
Barbara Hernandez the Parks and Recreation
Director for the City of Doral
SECTION 1
Doral Glades Park
C P Z TITLE PAGE
CPZ ARCHITECTS, INC.
4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317
1601 BELVEDERE RD., S-350, WEST PALM BEACH, FL 33406
200 N. EL MAR DRIVE, SUITE 201B, JENSEN BEACH, FLORIDA 34957
(954) 792-8525 AA# 26000685 WWW.CPZARCHITECTS. COM
City of Sunny Isles Beach
Space Needs Assessment and Site Feasibility Study
RFQ #21-10-01
November 30, 2021
“I want to personally thank you and your team. People cannot get
enough of how beautiful the building is. Your design was well
thought out. Not only is it beautiful but it is functional. Two very
important qualities. I truly appreciate your hard work and
passion.”
Barbara Hernandez the Parks and Recreation
Director for the City of Doral
SECTION 2
Doral Glades Park
C P Z TABLE OF CONTENTS
CPZ ARCHITECTS, INC.
4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317
1601 BELVEDERE RD., S-350, WEST PALM BEACH, FL 33406
200 N. EL MAR DRIVE, SUITE 201B, JENSEN BEACH, FLORIDA 34957
(954) 792-8525 AA# 26000685 WWW.CPZARCHITECTS. COM
Section 1 Title Page
Section 2 Table of Contents
Section 3 Cover Letter & Executive Summary
Current Workload
Key Personnel
MWDBE or meeting of procurement goals
Section 4 Project Approach & Understanding
Section 5 Qualifications & Assigned Personnel
Financial Stability
Awards, Training, Recommendations
Licenses
SF 330’s Part I and Part II
Organizational Chart
Section 6 References
SF 330’s Section E Resumes
SF 330’s Section F Projects
Section 7 Certificate of Good Standing
Section 8 Forms and Attachments
Required Forms
COI
Fire Station #80
“I have worked for the City of Coral Springs for
28 years and have to say that CPZ is one of the
best firms the City has ever hired.” Chief Curan
SECTION 3
Moffatt & Nichol, Inc.
We (or personnel now at Moffatt & Nichol) provided structural engineering consultation and design services for the
renovations and upgrades to the city of Coral Springs Public safety complex. Following a comprehensive site
assessment and audit of record construction documents, the existing police department building structure was
modeled and analyzed for resident load capacity. We coordinated the space planning and configurations with the
user and the architect to optimize strengthening for occupancy changes within the existing envelope. The
programming also included infill floors within the existing building volume and a vertical addition to create space for
an Emergency Operation Center. As such the entire building structure comprised of existing components and addition
was hardened to achieve Building Code compliance for risk category 4 facilities.
Moffatt & Nichol offers clients a professional and experienced support staff of more than 850 planning and design‐
related professionals and support personnel, who specialize in structural, civil, coastal, mechanical, and electrical and
construction engineering disciplines. The company is a private corporation and maintains a thirteen‐member board
of directors, with key practice leaders and operational managers who provide overall leadership for the company.
Most of these are working professionals with long and distinguished careers in engineering in the coastal
environment. The firm has been established in Florida since 1994, and currently has seven offices throughout the
state.
For our municipal clients, Moffatt & Nichol has acted as an extension of their staff to provide professional consulting
services on a variety of projects. We have attended commission and council meetings on short notice, developed
presentations for public workshops, and maintained web‐based project management systems to facilitate project
communication with municipal staff. Moffatt & Nichol has also prepared construction plans and specifications, as
well as a contract documents, for a number of projects in Florida, and has assisted municipalities in the competitive
bidding process. The firm also provides construction administration services to make certain the projects are
completed in accordance with the contract documents as well as the environmental permits.
100 W. Cypress Creek Rd., Ste. 960
Fort Lauderdale, FL 33309
p 954.622.8100
www.moffattnichol.com
November 23, 2021
City of Sunny Isles Beach
Attn: City Clerk
Sunny Isles Beach Government Center
18070 Collins Avenue, 4th Floor
Sunny Isles Beach, Florida 33160
RE: RFQ No. 21-10-01 Space Needs Assessment and Site Feasibility Study (CCNA) Request for Qualification
Dear City Clerk & Members of the Selection Committee:
OCI Associates, Inc. (OCI) is pleased to present our qualifications for your consideration as a sub-consultant to CPZ Architects for this
contract. We are a 34 year-old, full-service engineering design firm, providing mechanical, electrical, plumbing, fire protection, IT/
AV systems engineering design, commissioning, and construction administration services. OCI is headquartered in the Orlando area
with 10 branch offices throughout the United States. Our Principal and Electrical Engineer of Record, Sudharma Wijegunawardana,
PE, LEED AP, LC will be your primary point of contact for all MEP/FP/IT/AV engineering for this contract.
OCI has been providing assessments and building condition studies to more than 73 different public sector clients for over 20 years
including cities, counties, school districts and higher education instuitions. The government agencies listed below are our current
Continuing Service Contracts where we perform due diligence reports on MEP/FP/ITS systems:
· St. Lucie County
· Osceola County
· Manatee County
· Volusia County
· Lee County
· City of Palm Beach Gardens
· San Francisco Airport Commission
· Moffitt Cancer Center
· FL Department of Management Services
· U.S. State Department
· National Institute of Standards & Technology
· U.S. General Services Administration
· U.S. Bureau of Prisons
· U.S. Army Corp of Engineers
· Social Security Administration
Of particular interest, recent building condition assessments that we have completed include:
· Okeechobee County Facilities UV Report
· Okeechobee County HVAC Feasibility Report
· West Palm Beach Court Building Renovation Analysis
· Town of Jupiter Community Center Due Diligence Report
· Palm Beach County DramaWorks Theater Feasibility Study
· Palm Beach Sheriff’s Office HQ Annex Assessment
· Osceola County Command Center MEP System Study
· FHP Troop D HQ Roof Replacement Feasibility Study
· FHP Orlando I-Drive Facility Assessment & Report
· HMA HQ Assessment & Feasibility Report
· US GSA Courthouse Feasibility Study
· SSA Short Circuit & Feasibility Study
· SSA Generator Exhaust Stack Feasibility Study
· SSA AHU Reconditioning Feasibility Study
· South Bay Correctional Plumbing Investigation & Feasibility
· Volusia County Transfer Station Feasibility Study
· Osceola County Publix Feasibility Study
· San Francisco International Airport GBAS Feasibility Study
Since 2000, our team has worked on more than 500 projects where we had to provide an assessment of the existing conditions
of the MEP systems and/or equipment in an effort to renovate, expand or retrofit an existing building. We have been fortunate to
work with both federal agencies on unique studies and local government agencies, giving our team hands on knowledge in highly
secure buildings.
We feel confident in our ability to support CPZ Architects and the City of Sunny Isles Beach should we be selected and we are willing
to meet any location, budget or tasks or required of this contract.
Respectfully,
Amir Kazeminia, PE
President + CEO
REPRESENTATION OF THE FIRM
Amir Kazeminia, PE, President + CEO
600 S. Orlando Avenue
Maitland, Florida, 32751
407.332.5110
CURRENT WORKLOAD & IMPACT
See the chart below for our key team member’s current
and projected workloads for the next 6 months. We have:
· 2 assessments being performed
· 3 projects pending start
· 7 projects in design
· 1 project under construction.
Given our current and projected workload, we find
ourselves ready and able to take on your City's
Space Needs Assessment and Feasibility Study.
OCI is fully staffed with 70 people throughout our 11
offices; OCI has the resources to pull from our
Headquarters and other branch offices should additional
work arise.
OCI ASSOCIATES WORKLOAD
PROJECT NAME STATUS
Village of Palm Springs Police Building Due Diligence Report Ongoing
St. Lucie County Library Branch Assessment Ongoing
OCPS Andover ES Capital Renewal Awaiting Start
City of St. Cloud City Hall Roof & HVAC Renovation Awaiting Start
HCPS Tampa Bay Blvd ES Capital Renewal Awaiting Start
Debary City Hall HVAC Upgrades 50% DD’s
City of Hollywood Police Headquarters 90% CD's
Broward County Supervisor of Elections 100% DD’s
Casselberry Public Safety Facility 100% DD’s
Pasco County Detention Center Expansion 100% DD’s
City of Jupiter City Hall 100% DD’s
DMA West Palm Beach District Court of Appeal 100% DD’s
Palm Beach County Supervisor of Elections Permit Submitted
Okeechobee Sheriff’s Jail Renovation & Expansion Bid Set Submitted
DMS Peterson Building OAU Replacement Construction
"OCI is fully staffed with
70 people throughout our 11
offices; OCI has the resources
to pull from our Headquarters
and other branch offices
should additional work arise".
CERTIFIED MINORITY FIRM
OCI Associates, Inc. does not qualify as a certified minority business. However, we are a diverse company consisting of 24%
women employees and 32% minority employees. In addition, 35% M/WBE make up our Principal leadership. We are a true
definition of a company melting pot. Our firm is made of employees who’s heritage stems from Peru, Venezuela, Ecuador,
Honduras, Puerto Rico, Colombia, Jamaica, Haiti, Egypt, Sri Lanka, Greece, the Middle East, in addition to India, Asia and New
Zealand. OCI is a 74-person firm that supports diversity in the workplace.
MINORITY BUSINESS ACT
Depending on the nature of a particular project as well as any specified trades or teaming requirements, OCI has teamed
previously with local firms. We have supported many programs such as the Minority Business Enterprise (MBE), Women
Business Enterprise (WBE), Local Developing Business (LDB) and Service Disabled Veteran Owned Small Business (SDVOSB)
where this is required by the client. We typically will work with small, local businesses and partner with structural, civil,
architectural, geotechnical, and cost estimating firms where we anticipate needing these additional services under contracts.
76%
24%
OCI Gender Diversity
Male Female
32%
68%
OCI Minority Diversity
Minority Non-Minority
64%7%
14%
14%
OCI Leadership Diversity
Male Non-Minority
Female Non-Minority
Male Minority
Female Minority
64%7%
14%
14%
OCI Leadership Diversity
Male Non-Minority
Female Non-Minority
Male Minority
Female Minority
64%7%
14%
14%
OCI Leadership Diversity
Male Non-Minority
Female Non-Minority
Male Minority
Female Minority
"35% of OCI's Leadership
team is made up of women and
minority employees".
C P Z
CURRENT & PROJECTED WORKLOAD
CPZ ARCHITECTS, INC.
4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317
1601 BELVEDERE RD., S-350, WEST PALM BEACH, FL 33406
200 N. EL MAR DRIVE, SUITE 200, JENSEN BEACH, FLORIDA 34957
(954) 792-8525 AA# 26000685 WWW.CPZARCHITECTS. COM
Recent, current, and projected workload of the firm
Our current workload has projects at various levels of completion. As you review our workload summary below
you will see several projects that are in the construction phase and nearing completion this year. This allows us to
start shifting our resources over the next three months to add a new design project such as yours. Based on our work
schedule, this is a perfect opportunity for our office. Our current workload will allow us to start immediately on
your project. We would like the opportunity of meeting with you to discuss this further. If you have any questions
and/or require additional information, please call.
Martin County Fire Stations #14 & #18, Florida
CPZ Architects completed construction documents for Martin County new
Fire Stations #14 & #18. Fire Station 14 is located on Hutchinson Island
and Fire Station 18 is in a Residential area in Martin County, Florida. The
12,389 sf. 1-story facility consists of 3 bays, 10 dormitories, gym, bunker
gear room, quiet room, offices, scuba, shop, decon and a commercial grade
kitchen. The same prototype station was used in two separate locations as
a means of savings on Design and Construction costs for the County.
Design of both new stations reflects the Key West style Architecture predominant in
the adjacent residential neighborhoods at both locations.
Phase: CA Cost: $5.1 million Completion: September 2022
Broward County West Regional Court House Phase II Renovation
CPZ Provided Architectural Services for the phase II Renovations. This includes
General design of the interior office spaces clerk of court Civil and Marriage.
Prepared 100% construction document and specification. CPZ Architects is currently
working with Broward County to renovate the clerk of the court offices and public
spaces at the West Regional Courthouse in Plantation. We are improving traffic
pattern and workflow of the space. The new layout addresses many of these issues by
designing open office space that is easily accessible to all employees and providing
each department with immediate access to support areas for better flow. Waiting areas have
been expanded and enlarged for a better user experience. Phase: CD’s Completion: 2022
City of Coral Springs Fire Station #64
In 2005 CPZ Architect’s completed a renovation of Fire Station 64. The project involved the
compete remodeling of the Fire Station to provide an up-to-date Fire Station and more
importantly improve the functionality of the station. The design and construction documents
were developed into a two-phase project, allowing the Fire Station to maintain its operation
during the construction process. A temporary modular dormitory was installed on site to
provide temporary living quarters during the construction process. In 2020 CPZ Architect’s
was selected to design the new Fire Station. The project will require the demolition of the existing building. The
project will include the design of a new, single story fire station of approximately 8,000 square feet and all site
work. The structure may include 3 bays, 8 bunkrooms, 3 unisex bathrooms, an exercise room, 2 offices, alarm room,
day room, commercial kitchen, dining area, storage space, laundry facilities, backup power (with redundant plug).
The station is planned to be built approximately 1000 feet North of the current structure. Once the new structure is
complete and operational the existing station is to be demolished and restored as part of the adjoining park (Kiwanis
Park). CPZ Architects completed both Coral Springs new Fire Stations #43 & #95. The same prototype station
was used in two separate locations as a means of savings on Design and Construction costs for the city. It is the
City of Coral Springs intent to substantially match the design for the two before mentioned stations.
Phase: Permit Scheduled Construction Completion: December 2022
C P Z
CURRENT & PROJECTED WORKLOAD
CPZ ARCHITECTS, INC.
4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317
1601 BELVEDERE RD., S-350, WEST PALM BEACH, FL 33406
200 N. EL MAR DRIVE, SUITE 200, JENSEN BEACH, FLORIDA 34957
(954) 792-8525 AA# 26000685 WWW.CPZARCHITECTS. COM
Westside Maintenance Facility Master Plan, Coral Springs, Florida
CPZ Architects was retained to redesign the existing Westside Complex for the
City of Coral Springs to be developed in phases to an overall campus master plan.
site.
Phase: Construction Administration Cost: $25 million Completed: April
2022
Projected Workload:
Flamingo Gardens Welcome Center, Davie, Florida
CPZ provided design services for the Welcome Center at the Flamingo Gardens,
a botanical garden and bird sanctuary park in Davie, Florida. The facility will
include a Visitors Center, gift shop, restaurant, multi-purpose rooms, and
administrative offices and supporting spaces. Site improvements include new
parking, site lighting and landscape upgrades.
Phase: Construction Administration Scheduled Completion: 2023
CPZ Architects, Inc. was selected to provide design, permitting, planning,
engineering and construction administration services for a new facility to
consolidate Port Facilities Maintenance and Operations from the current functions
that are located within various buildings throughout the Port Everglades campus
into a central location. The Project is intended to take place in three phases. The
first phase will be the programming phase. The second phase will be the design
and preparation of construction documents and permitting phase. The third phase
will be the construction of the facility.
Phase: Contract Negotiations Scheduled Completion: 2023
C P Z TEAM KEY PERSONNEL
CPZ ARCHITECTS, INC.
4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317
1601 BELVEDERE RD., S-350, WEST PALM BEACH, FL 33406
200 N. EL MAR DRIVE, SUITE 201B, JENSEN BEACH, FLORIDA 34957
(954) 792-8525 AA# 26000685 WWW.CPZARCHITECTS. COM
Your Project Principal and founding Principal, Chris P. Zimmerman, AIA has provided services to many
local municipalities and counties in Florida. With over 38 years of experience, he has the passion and dedication
to assure you will receive a quality project. Chris Zimmerman provided programming and feasibility studies on
numerous municipal projects over his career. Chris will work personally with City Staff on all phases of this
project as he has worked on the city side of his career. Chris has worked for the City of Fort Lauderdale and
was a previous Council Member for the City of Plantation. Chris ‘s knowledge with working in the municipal
government sector will bring a strong knowledge base for your project of programming and feasibility study.
Chris’s client-focused commitment to project success – from precise documentation of measurable client goals
and objectives, building code verification and project planning, to fully detailed construction documents,
through final punch list – has earned him the reputation as a quality architect in the Florida community. To his
design work, Chris also brings in-depth constructability knowledge and application to projects through his
certification as a general contractor, a faculty that assures his clients that his designs have been developed to be
economically buildable.
Jayson Hall has served as Senior Project Manager on many of CPZ Architects’ most significant projects. He
brings to his management role the commitment to not only meet, but anticipate and exceed, his client’s needs.
Jayson is very knowledgeable for the Sunny Isles Beach Needs Assessment and will be valued asset to the
project. Jayson’s record of meeting client goals for on time, in budget performance, combined with responsive
aesthetic and functional design solutions, has resulted in valued long-term relationships with both public and
private sector clients. As project manager, Jayson performs initial concept design, site planning, develops
construction documents, construction administration and final project close-out. His capabilities in all aspects of
architectural design include the creation of project concepts to detailing and coordinating construction
documents. Jayson’s skill in the project’s construction phase ensures timely response to contractor queries,
resolution of any issues, and completion of the facility in accordance with the plans and specifications. Jayson’s
project experience includes both new construction and existing facility renovations, as well as tenant interior
improvements and building upgrades.
Nikolas Marchan joined CPZ Architects as an Associate Level III Architect. His main responsibilities are to
provide architectural services ranging from preliminary design through construction administration for multiple
projects at one time. Nikolas manages all phases of a project from site plan approval through construction
administration. Nikolas serves as Project Manager on key CPZ Architects projects. He brings to his
management role the commitment to not only meet, but anticipate and exceed, his client’s needs. Nikolas’s
record of meeting client goals for on time, in budget performance, combined with responsive aesthetic and
functional design solutions, has resulted in valued long-term relationships with both public and private sector
clients. As project manager, Nikolas performs initial concept design, site planning, develops construction
documents, construction administration and final project close-out. His capabilities in all aspects of architectural
design include the creation of project concepts to detailing and coordinating construction documents. His
experiences range from multi-million-dollar dealerships to retail and high -rise residential projects. His diverse
portfolio includes a pier extension in St. John’s Antigua, the Crandon Tennis Stadium in Key Biscayne, Cruise
Ship Terminal 2 in Galveston Texas, Gunther Mazda car dealership in Fort Lauderdale and University Town
Center retail buildings in Sarasota, Florida.
Our Structural Engineer is Moffatt & Nichol. Lawrence (Larry) DeRose has more than 40 years of marine,
structural, and civil engineering consulting experience in South Florida with an emphasis on port, marine,
structural, land development, and terminal projects, from planning to construction certification. Larry’s
C P Z TEAM KEY PERSONNEL
CPZ ARCHITECTS, INC.
4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317
1601 BELVEDERE RD., S-350, WEST PALM BEACH, FL 33406
200 N. EL MAR DRIVE, SUITE 201B, JENSEN BEACH, FLORIDA 34957
(954) 792-8525 AA# 26000685 WWW.CPZARCHITECTS. COM
professional background includes all levels of experience in his areas of specialization, ranging from the most
basic to management of complex projects, and in a broad variety of studies involving the practical applications
of hydrology, hydraulics, fluid mechanics, and structural mechanics. He is experienced in all aspects of
planning and directing studies that involve large- and small-scale site development for government planning
programs, including feasibility, construction, and development. Larry as Owner of Derose Design Consultants
worked with CPZ Architects Coral Springs Public Safety Complex, Coral Springs, FL. Principal-in-
charge/structural engineer for the reconfiguration and structural hardening of an existing 60,000-square-foot
safety complex, located on a 7-acre site, that includes a new LEED-certified fire station building, police station,
two-story addition, and parking area. Services for the included structural, civil, mechanical, electrical,
plumbing, fire protection, and life safety engineering, as well as energy modeling and commissioning.
Ludovic Binner is a senior structural engineer with experience in structural design, wind frame analysis,
calculations, special inspections, and construction administration for projects in the United States and France.
He has worked on a variety of projects including multi-level hotels and resorts, educational facilities,
community centers, sports arenas, park facilities, performing arts buildings, and marine facilities structures.
Ludovic is experienced has experience as a project manager on both private and public sector work, leading
intensive coordination between engineering disciplines, consultants, and clients.
Our MEP Engineer is OCI Associates. Specific to this contract, the OCI team will be led by Sudharma
Wijegunawardana, PE, LEED AP, LC who is and will be the Project Manager and the Electrical Engineer of
Record. She will be supported by Jason Smith, PE, LEED AP BD+C who is a Certified Energy Manager and
will be looking for ways to reduce energy costs as the Mechanical Engineer of Record. Sudharma will lead the
teams’ efforts for complete design, specification, and construction administration of systems for heating-
ventilating-and-air conditioning (HVAC); electrical systems including power, lighting, fire alarm, security,
telecommunications, and information transport systems; plumbing systems including medical gases; and fire
protection systems.
Dan Jeffreys with CMS-Construction Management Services, Inc. (CMS) is comprised of a special blend of
technical talents unique to both the Architectural/Engineering and General Contracting professions of today.
Located in Broward County since its inception, CMS’s staff has been providing Construction (Project/Program)
Management/Owners’ Representative and Cost Estimating/Cost Consulting services in the Tri-County area to
both public and private sectors—including governmental agencies such as cities, counties, school districts, and
airports throughout the state of Florida—and performing its services with an impeccable track record. For the
past several years, CMS has been providing Cost Control/Estimating Services for a multitude of projects for the
Fort Lauderdale / Hollywood International Airport’s expansion/modernization program. We, at CMS, consider
our approach to Cost Control/Estimating to be of utmost importance in maintaining a project within the required
budgetary constraints. Our multi-disciplined staff consists of individuals with years of experience and various
degrees ranging from Construction Management, Civil Engineering, and Quantity Surveying to Business. Our
experiences include, but are not limited to, the following services:
1) Construction (Project) Management/Owner’s Representative for large city/county projects;
2) Cost Estimating/Cost Control for a variety of municipal, county, and federal projects;
3) Value Engineering in reducing construction cost at various levels of design;
4) Constructability Reviews and Evaluations prior to solicitation of bids;
5) Feasibility Studies and Budget Development;
6) Contract Administration of multiple public and private projects;
C P Z DIVERSITY STATEMENT
CPZ ARCHITECTS, INC.
4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317
1601 BELVEDERE RD., S-350, WEST PALM BEACH, FL 33406
200 N. EL MAR DRIVE, SUITE 201B, JENSEN BEACH, FLORIDA 34957
(954) 792-8525 AA# 26000685 WWW.CPZARCHITECTS. COM
CPZ strives to work with consultants that represent the diversity we value. We are proud to maintain
consultants that represent both women and minority owned corporations and certified small businesses. It is
further the policy of CPZ Architects, Inc. to encourage vendors, contractors, affiliating institutions, and
others doing business with CPZ Architects, Inc., to observe the principles of Equal Employment
Opportunity.
CPZ Architects recognizes its talented and diverse workforce to building a lasting and successful
architectural firm. Our business success reflects the quality and skill of our people. CPZ is committed
to seeking out and retaining the finest human talent to ensure top business growth and
performance.
Diversity management benefits individuals, teams, our company as a whole, and our clients. We
recognize that each team member brings their own unique capabilities, experiences, and
characteristics to their work. As an organization, we value the contributions brought to us through these
diverse perspectives.
We believe in treating all people with respect and dignity; therefore, we strive to create and foster a
supportive and understanding environment in which all individuals realize their maximum potential
within the company, regardless of their differences. We also recognize the importance of reflecting
the diversity of our clients and markets in our workforce. The varied capabilities that reside within
our talented workforce, positions our team to anticipate and fulfill the needs of our diverse customers
enabling us to develop the lasting client relationships for which we are known.
Our team’s diversity encompasses d ifferences in ethnicity, gender, language, age, sexual orientation,
religion, socio-economic status, physical ability, thinking styles, experience, and education. We
believe that the wide array of perspectives that results from such diversity encourages innovation
and business success. Managing diversity makes us more creative, flexible, productive, and competitive.
CPZ Architects is a diverse architectural practice located in South Florida. We are a small firm of 14
with three licensed architects. Of these 14 employees, 7 are women, one is African American/Chinese, 8
are Hispanic American and one LGBQ. We do not discriminate based on ethnicity, gender, language,
age, sexual orientation, religion, socio -economic status, or physical ability. Each employee is
encouraged to advance within both the firm and the profession.
Our firm offers flexibility in working time arrangements, open communications within our pleasant
working environment, employee education assistance, employee networking and support groups as well
as mentoring. All of this along with a zero-tolerance policy towards any form of prejudice earns us an
enjoyable working atmosphere that promotes creativity through diversity.
CPZ Architects, Inc. goal is to achieve and maintain equal employment opportunities. It is the
responsibility of all to conform to the letter and the spirit of all applicable Civil Rights Laws. CPZ
Architects, Inc. is an Equal Opportunity Employer and follows Title VII of the Civil Rights Act of 1964
as amended, Age Discrimination in Employment Act of 1967, and the Rehabilitation Act of 1973, and
employs without regard to sex, race, color, national origin, religion, age, handicap or status as a disabled
or Vietnam era veteran.
Minority Business Certification
CMS-Construction Management Services, Inc.
10/21/2019 10/21/2021
4. CERTIFIED MINORITY FIRM
OCI Associates, Inc. does not qualify as a certified minority business. However, we are a diverse company consisting of 24%
women employees and 32% minority employees. In addition, 35% make up our principal leadership. We are a true definition
of a company melting pot. Our firm is made of employees who’s heritage stems from Peru, Venezuela, Ecuador, Honduras,
Puerto Rico, Colombia, Jamaica, Haiti, Egypt, Sri Lanka, Greece, the Middle East, in addition to India, Asia and New Zealand.
OCI is a 74-person firm that supports diversity in the workplace.
76%
24%
OCI Gender Diversity
Male Female
32%
68%
OCI Minority Diversity
Minority Non-Minority
64%7%
14%
14%
OCI Leadership Diversity
Male Non-Minority
Female Non-Minority
Male Minority
Female Minority
Lංඏංඇ Wඈඋൽ Oඉൾඇ Bංൻඅൾ Cඁඎඋർඁ
SECTION 4
C P Z PROJECT APPROACH & UNDERSTANDING
CPZ ARCHITECTS, INC.
4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317
1601 BELVEDERE RD., S-350, WEST PALM BEACH, FL 33406
200 N. EL MAR DRIVE, SUITE 201B, JENSEN BEACH, FLORIDA 34957
(954) 792-8525 AA# 26000685 WWW.CPZARCHITECTS. COM
Our Team approaches every project as an opportunity for success. Our goal is to provide a completed project
that meets the needs of our client and the end user. We believe in working closely with you, the client, and
our consultants to complete a thoroughly coordinated project. CPZ’s project approach is both systematic and
progressive. As the Architect, we will be the designers of your building and overall site functions. The
functionality of the facility, both site and building, will be our top priority. This shall be blended into an
aesthetically pleasing design that you can be proud of in your City. Our staff includes LEED accredited
professionals to assure that your new facility is sustainable, provides a quality indoor environment and is
energy efficient. We are also experienced in other forms of certifications including Green Globes and Florida
Green Building Coalition. We believe in working closely with you, the client, and our consultants to
complete a thoroughly coordinated project. Our project method approach usually as follows:
Programming
The first part of this project is the programming and recommendations report.
CPZ will issue a questionnaire for Staff to fill out prior to our first
programming meeting. In this phase the design team will meet with staff to
review all the project goals and gather all the analysis data. Then we will meet
with all the departments concerned and determine the project specific needs,
requests and budget for the entire project. These meetings are essential for the
Design team and City staff to work together. During the programming
phase we will meet on the site with our design consultants and provide a due
diligence site report. This due diligence report includes all discipline reviews
and code analysis, zoning requirements and City and County ordinances
review. CPZ will also meet with Planning and Zoning during this phase to
review the entire project for master planning and site plan approval process.
We also request our clients to provide a survey and the geotechnical services
during this phase. Once all programming requirements mentioned above are
completed, the design team will issue a programming report.
Once a facility program is developed, we will be able to identify the
total building square footage as well as the parking and vehicle storage
areas that will be required. This will allow us to start the review of
available building/sites (Tracts A, B & C. As an example, we assisted
the City of Coral Spring’s in the evaluation of an existing tilt wall
warehouse that was for sale for use as a Public Works and Fire
Administration Facility. We determined that the existing building was able to be utilized and had enough
interior height for the vehicle lifts in one area and in the other areas allowed for a second floor to be installed
within the existing structure. Based on the title wall nature of the building, we were also able to reinforce the
structure so it could be utilized as an “Essential Facility” during emergencies.
Conceptual Design
Once the programming phase has been completed and with the scope in hand, we
will develop a project milestone schedule and begin schematic design. During
schematic design we request that the City’s Project Manager identify all City
departments and users that will provide input on the project. CPZ will then set a
kickoff meeting with all members of the City and all members of our design
team. Several meetings will follow as the design evolves. As a starting point,
our project manager will develop several preliminary master plan and floor plan
options for review and then request a meeting with the City and selected staff for
C P Z PROJECT APPROACH & UNDERSTANDING
CPZ ARCHITECTS, INC.
4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317
1601 BELVEDERE RD., S-350, WEST PALM BEACH, FL 33406
200 N. EL MAR DRIVE, SUITE 201B, JENSEN BEACH, FLORIDA 34957
(954) 792-8525 AA# 26000685 WWW.CPZARCHITECTS. COM
a Charrette type meeting where we spend a full half day to review their ideas and comments and develop the
details of the master plan and floor plan options and all the specific requirements based on the
programming report. Based on our feedback from meetings, we will make changes and submit the selected
master plan and floor plan schematic drawing to our cost estimator to generate a schematic cost estimate for
the project. As part of the schematic design phase of your project we will review all agency reviews and
permitting that will be required and ADD them to the schedule.
Project Management Plan
Our comprehensive staff provides a wide variety of design and construction experience to assist the City in the
successful completion of this project. You will have the same Senior Project Manager from the start of a
project through the end of construction, also providing the continuity required for a successful project
completion. Our Firm works with our clients to determine the project schedule at the start of the project to
include the Design Phase, Permitting Submittals, and estimated construction phase. We then create an
electronic schedule that can be maintained throughout the project. This schedule is reviewed at the completion
of each phase of the project. If the project falls behind schedule, we determine what is required to bring the
project back on schedule and make the necessary revisions. We have the ability to add additional people to the
project, extend work hours or both if these methods will expedite the project. Based on the scope of work
contained within the RFQ, we cannot assign hours to all the tasks now. However, we can inform you that we
do have the staff available to work on your project immediately and continuously. Other scheduling solutions
may include changing the sequence of activities to maintain the project moving to completion.
On Time and In Budget
Coral Springs Public Safety Complex Miami Gardens Community Center
CPZ Architects was retained by the City of Miami Gardens by the recommendation of the City of Coral
Springs, to take on the completion of the 60,000 SF Community Center, after the original architect was
removed by the city. Project was under construction needing several items to be resolved and redesigned
simultaneously, to avoid construction delays. CPZ Architects timely completion of the project resulted in the
retention of our firm to complete an amphitheater on the Community Center complex.
C P Z PROJECT APPROACH & UNDERSTANDING
CPZ ARCHITECTS, INC.
4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317
1601 BELVEDERE RD., S-350, WEST PALM BEACH, FL 33406
200 N. EL MAR DRIVE, SUITE 201B, JENSEN BEACH, FLORIDA 34957
(954) 792-8525 AA# 26000685 WWW.CPZARCHITECTS. COM
Cost Control Techniques
Schedule Control – Our Firm works with our clients to determine the project schedule at the start of the
project to include the Design Phase, Permitting Submittals, and estimated construction phase. We then create
an electronic schedule that can be maintained throughout the project. This schedule is reviewed at the
completion of each phase of the project. If the project falls behind schedule, we determine what is required to
bring the project back on schedule and make the necessary revisions. We can add additional people to the
project, extend work hours or both if these methods will expedite the project. Other scheduling solutions may
include changing the sequence of activities to maintain the project moving to completion.
(Your Project)
Tract “A” 18,277 SQ FT
Tract “B” 26,466 SQ FT
Tract “C” 98,399 SQ FT
Possible Conceptual Site Layout
• New Construction
• Parking Structure
• Renovation
Note: Possible Conceptual
Layout shown is a conceptual
diagram to show we understand
scope based on RFP.
PROJECT MANAGEMENT PLAN
SCOPE
OCI will conduct a thorough MEP/FP equipment and systems
space analysis to demonstrate the current inadequacies and
offer estimates of current and projected space requirements
based upon industry standards, policing trends, and the
City’s growth for all proposed locations. We will provide site
evaluations and gathering of appropriate data on existing
facilities and work with the City and CPZ Architects to
determine if renovation, expansion, or new construction is
possible at one of the property locations.
OCI will provide a comparison of the life cycle for the
renovation of an existing facility, acquisition of an adaptive re-
use facility, or new construction. We will identify building costs
and site requirements, including lot size recommendations,
and required site elements, including but not limited to
parking, security, lighting, access, visibility, etc.
OCI will collaborate with City staff on policing philosophy,
organizational hierarchy, current and future department
goals, jurisdictional strategic plan, staffing projections, key
personnel to be interviewed, space needs of agency by
function, and any other information deemed appropriate
to ensure an accurate analysis. We understand the existing
facility’s layouts, building codes within jurisdiction and future
policing trends and needs.
OCI will assist CPZ Architects in obtaining public and
community comments and/or information, as mutually
agreed upon between the City of Sunny Isles Beach.
METHOD OF APPROACH
1. Our Project Manager, Sudharma will create a spreadsheet
with all the facilities listed with hours available and work
with each manager of the building to set aside team for
the OCI team to visit the site with minimal disruption.
2. OCI always keeps the schedule of your Facilities team
and the access to each site/building in mind when
determining the best time to conduct each investigation.
3. We take into consideration the hours of operations of the
existing and occupied facilities and coordinate with the
facilities' teams to gain access of proposed buildings and
secured rooms.
4. To utilize the best means of everyone’s times, we will
determine if multiple sites can be visited in one day and
make a geographic map of the locations to optimize the
best use of everyone’s schedule.
5. The next step in our process is to speak and meet with
the maintenance team and pull any existing as-built
drawings, maintenance reports, and issues log, so the
team has a full picture of the existing condition of each
building space before visiting the site.
6. As we compile information, photograph and document
each site visit; information will be uploaded into a
Cloud Server for all team members to utilize and store
information to keep a collaborative approach to the
building assessments.
7. Our team will meet on a regular basis to discuss and
confer on items seen in an effort to keep everyone in
the loop.
8. Our Project Manager will develop the Property Condition
report with identified deficiencies to the The City with
our teams recommendations for repair, replacement and
ideas that may be necessary for the useful life remaining
with budgets and anticipated time frames to maintain
the existing spaces.
9. Any buildings or equipment that have immediate needs
will be listed and prioritization giving.
10. Our team will work with you to create a preliminary
budget, taking into account quality of materials,
availability of equipment, manufacturers preferred with
a long term goal and plan to get all the buildings up to
code and standards.
"A Collaborative
approach to building
assessments is uploading
photographs and
documenting each site
to a Cloud Server for
easy access to all team
employees".
Cඋඈඐඇ Cൾඇඍൾඋ Rൾඍൺංඅ
SECTION 5
C P Z
CPZ ARCHITECTS, INC.
4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317
1601 BELVEDERE RD., S-350, WEST PALM BEACH, FL 33406
200 N. EL MAR DRIVE, SUITE 201B, JENSEN BEACH, FLORIDA 34957
(954) 792-8525 AA# 26000685 WWW.CPZARCHITECTS. COM
QUALIFICATIONS & EXPERIENCE
CPZ has experience with a variety Projects in South Florida. CPZ Architects has experience with Municipal
projects, Community Centers, Public Works Fleet Maintenance Buildings, both new and renovated and
renovations of existing libraries, Facility Needs Assessments, Space Programming. The continued experience
we have gained has provided us with an understanding of the Owner and the pride of Ownership for your
own building and Image. We will provide a Space needs Assessment Report to ensure your building and City
departments function well, has built in flexibility and present an image to both the public and your personnel
that is warm and friendly and integrates into an existing built environment.
As we review your project there will many challenges, however, with our past experience we will be able to
resolve them smoothly. The most challenging may be building consensus among all the stake holders and city
commission. We see our job as the firm that will provide clear and concise information about Assessment that
can be easily understood by everyone. We have created a team of experts from that can respond and review
every component and present the information in a comparable report.
As stated in the Executive Summary our experience with Space Needs Assessment has given CPZ a unique
understanding of the requirements for your Space Needs and Feasibility Study. CPZ will view your Facility
not just as a building but a Campus complex that houses many different services and departments. Specific
requirements such as different vehicle sizes and their need for service (in house or outside of the facility),
coordination of multi-functional departments and their need to all work together in a efficient and functional
capacity.
The greatest testament to the quality of our service can be seen in our
repeat Clients. Coral Springs has been utilizing CPZ Architect over
the past 15 years in developing, implanting and expanding their Public
Works Facility. Recently we worked with Coral Spring in determining
the need to purchase an adjacent building and utilize it for more and
better space. The review proved that this was a beneficial purchase.
When presented to the City Commission is was unanimously
approved.
Similar to the work CPZ is doing with the City of Coral Springs, The
City of Delray Beach Police Department hired CPZ to complete a
needs and assessment study of their existing Police Department
Facilities to determine if the existing building could be renovated or
based on the results of the assessment report build a new Police
Facility. CPZ Architects has completed a needs assessment of the
Delray Beach Police Station outlining their current needs and
providing an estimate of the future space needs for the next 10 years.
A conceptual master plan was developed for two possible solutions to
their space needs along with budgetary estimates. Option 1 included
using the existing facility and expanding around the facility along with
construction of parking garage. The second option was to construct a
completely new multi-story facility on the back part of the site, while
maintaining operation in the existing facility. Upon competition of the
new facility, demolish the existing facility and construct the new
parking garage. CPZ Architects has now been retained to provide a
needs assessment for the City Hall and Community Center Site.
C P Z
CPZ ARCHITECTS, INC.
4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317
1601 BELVEDERE RD., S-350, WEST PALM BEACH, FL 33406
200 N. EL MAR DRIVE, SUITE 201B, JENSEN BEACH, FLORIDA 34957
(954) 792-8525 AA# 26000685 WWW.CPZARCHITECTS. COM
QUALIFICATIONS & EXPERIENCE
CPZ Architects, Inc. was selected to provide design, permitting, planning,
engineering and construction administration services for a new facility to
consolidate Port Everglades Facilities Maintenance and Operations from
the current functions that are located within various buildings throughout
the Port Everglades campus into a central location. The Project is
intended to take place in three phases. The first phase was the
programming phase. The second phase will be the design and preparation
of construction documents and permitting phase. The third phase will be
the construction of the facility.
CPZ Architects provided full architectural design services for Glades
Park which included a 9,000 sf Community Center. CPZ had the pleasure
of working with the City of Doral on their brand new $10.5 million
Glades Park & Nature Center Building project. The Nature Center’s tall
glass walls were oriented to the North to maximize daylight use with less
heat gain. Other architectural features include a large dedicated vaulted
ceiling nature exhibit room, large, vaulted ceiling multipurpose room
with moveable wall partitions., catering room, science lab classroom for
children, e-library, vaulted ceiling lobby area, projection room, remotely controlled lighting and VRF air
conditioning systems and outdoor Amphitheatre with its stage edging the 12-acre Lake. Doral Glades Park
took Honorable Mention at the 2019 Fort Lauderdale Chapter American Institute of Architecture Design
Awards. This Facility is Green Globes certified (2 Globes).
Harden and renovated the existing three story 45,000
square foot Coral Springs Police Station and add a
new 11,500 square foot two story addition for Fire
Administration and Emergency Operation Center.
CPZ worked closed with Larry DeRose formerly
with DeRose Design Consultants which included
new impact resistant windows and doors, new roof
and any structural repairs that needed to bring the
building up to current code.
The City of Coral Springs decided to renovate the interior of the Police Station building with the extra 4 million
left over from the budget. Interior renovations include new HVAC, new fire sprinklers, new finishes, new paint,
new lighting, and reconfiguration of spaces to meet the police department’s needs. Full re-configuration of their
existing seven-acre secure site. Site work included state of the art security gating and monitoring systems, re-
configuration of parking areas, full landscape work and the creation of attractive and functional exterior
gathering spaces to add to the planned spaces to add to the planned new City Corridor along Sample Road and
Coral Springs Drive. Construction cost during bidding estimated at 12 million bids came in at 8 million.
C P Z
CPZ ARCHITECTS, INC.
4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317
1601 BELVEDERE RD., S-350, WEST PALM BEACH, FL 33406
200 N. EL MAR DRIVE, SUITE 201B, JENSEN BEACH, FLORIDA 34957
(954) 792-8525 AA# 26000685 WWW.CPZARCHITECTS. COM
QUALIFICATIONS & EXPERIENCE
Experience with Security
CPZ Architects, Inc. has a great deal of experience with security including video surveillance, electronic door
controls, and access card door control. We have had a continuing services contract with the Federal Reserve
Bank of Atlanta, the Doral Branch for over 10 years in which we have done over 30 projects. We also have
continuing service contracts with the Town of Davie and the City of Coral Springs where we have designed
and renovated police stations, including the assessment of the City of Delray’s Police Station and fire stations.
Video Surveillance
We have installed video surveillance in the lobby of the Federal Reserve Bank and throughout the 20 acre area
of the Doral Glades Park.
Electronic Door Control
The Federal Reserve Bank and all the Police and Fire Stations that we have done in the Town of Davie, City
of Coconut Creek and the City of Coral Springs had to have secured door controls. We also had to provide
this for the City of Doral Glades Park. Our SF330 form under projects will show this information.
Access Card Door Control
Besides the Federal Reserve Bank and the police stations, all the Fire Stations that we did in the Town of
Davie FS#86, City of Coral Springs FS#80, 43, 95, City of Coconut Creek FS#50, City of West Palm Beach
FS#4, City of Fort Lauderdale FS#8 had to have the access card door control. We also included this security
at the Miami Gardens Community Center, Doral Glades Park and the Senior Center in Sunrise.
Blast Study
Our office was involved in the construction of a new remote lobby entrance to the Federal Reserve Bank after
a blast study was performed to determine the possible threat level at the entry point.
5. SIMLAR PROJECTS OVER THE PAST 5 YEARS | partial list
Village of Palm Springs Police Building
Architectural Programming and Building Conditions Assessment Report, Lake Worth, Florida
Client Contact: Village of Palm Springs | Sebastian Velazquez Feliu, Project Manager | 561.655.2423
Contract Date: 2021 Present Status: Ongoing
Scope or Nature of the Contract: OCI Associates was selected as a sub-consultant to an Architectural firm to provide a Due
Diligence Report and Building Conditions Assessment of an existing Police Station building located in Lake Worth. Our team
members were required to provide a site visit and evaluate the following building systems; Mechanical Systems, Electrical
Systems, Plumbing Systems, Fire Protection Systems, Low Voltage Systems. After the evaluation, our team provided a report
of findings such as the general condition, MEP engineer’s opinion of overall serviceability and longevity as well as our
recommendation for remedial repair or a completed replacement of the systems and a probable cost estimate.
St. Lucie County
Port St. Lucie Library Architectural Programming and Building Conditions Assessment Report, Port St. Lucie, Florida
Client Contact: St. Lucie County | Scotty Beaulieu, Project Manager | 772.462.1432
Contract Date: 2021 Present Status: Ongoing
Scope or Nature of the Contract: OCI Associates was selected as a sub-consultant to an Architectural firm to provide a
Due Diligence Report and Building Conditions Assessment of an existing 6,000 -square-foot library to determine whether
to expand the facility or build a new one. Our team members provided a site visit to the library and evaluate the following
systems; Mechanical Systems, Electrical Systems, Plumbing Systems, Fire Protection Systems, Low Voltage Systems. After
the evaluation, our team provided a report of our findings such as the general condition, MEP engineer’s opinion of overall
serviceability and longevity as well as our recommendation for remedial repair or a completed replacement of the systems
and a probable cost estimate. The report determined that the telecommunication cabling has been run as needed over
the years but is inadequate for current needs. The Youth areas, stacks, community meeting room and staff areas are
all inadequate and a new building has been determined as the best possible outcome for the district.
Department of Military Affairs
West Palm Beach District Court of Appeal Renovation, Due Diligence Report and Assessment, Palm Beach, Florida
Client Contact: Department of Military Affairs | Sebastian Velazquez Feliu, Project Manager | 561.655.2423
Contract Date: 2020 Present Status: Ongoing
Scope or Nature of the Contract: OCI Associates was selected as a sub-consultant to an Architectural firm to provide a Due
Diligence Report and Building Conditions Assessment of the existing District Court of Appeal building. Our team members
were required to provide a site visit to the building and evaluate the following systems; Mechanical Systems, Electrical Systems,
Plumbing Systems, Fire Protection Systems, Low Voltage Systems. After the evaluation, our team provided a report of findings
such as the general condition, MEP engineer’s opinion of overall serviceability and longevity as well as our recommendation
for remedial repair or a completed replacement of the systems and a probable cost estimate. The report was provided to
the Owner; and led the team to move forward with a new job order from the Owner to renovate the existing space into a
Readiness Center for the US National Guard; which OCI is currently designing the new replacement systems for the project.
Palm Beach Sheriff's Office
Headquarters Annex - Architectural Programming and Building Conditions Assessment Report, Palm Beach, Florida
Client Contact: Palm Beach Sheriff's Office | Sebastian Velazquez Feliu, Project Manager | 561.655.2423
Contract Date: 2019 Present Status: Completed
Scope or Nature of the Contract: OCI Associates was selected as a sub-consultant to an Architectural firm to provide a Due
Diligence Report and Building Conditions Assessment of the existing Sheriff's Office headquarters building located in Palm
Beach. Our team members were required to provide a site visit and evaluate the following systems; Mechanical Systems,
Electrical Systems, Plumbing Systems, Fire Protection Systems, Low Voltage Systems. After the evaluation, our team provided
a report of findings such as the general condition, MEP engineer’s opinion of overall serviceability and longevity as well as our
recommendation for remedial repair or a completed replacement of the systems and a probable cost estimate.
PAST RECORD & PROJECT EXPERIENCE OF FEASIBILITY STUDIES & ASSESSMENTS
Feasibility Studies & Reports
Seminole State College Building V, Sanford, FLMechanical System Feasibility Study
Florida South Western State College Childcare Building V, Lee Campus, Ft. Myers, FLMEP System Feasibility Study and Assessment
St. Lucie County Building V, Clover Field Upgrade, St. Lucie, FLMechanical System Feasibility Study
School District of Palm Beach County Pahokee High School, Pahokee, FLAssessment & Feasibility Report
St. John Vianny Catholic SchoolChilled Water Feasibility Study, Orlando, FL
School District of Indian River Glendale Elementary School, Vero Beach, FL HVAC Site Investigation & Feasibility Study
School District of Osceola County Poinciana High School, Kissimmee, FLChilled Water Feasibility Study
Flagler County Public SchoolsBelle Terre Elementary School, Palm Coast, FLFeasibility Study
St. Lucie Public SchoolsWeatherbee Elementary School, Port Saint Lucie, FLFeasibility Study
St. Lucie Public SchoolsFrancis K. Sweet Elementary School, Fort Pierce, FLFeasibility Study
Valencia State CollegeWinter Park Campus, Winter Park, FLHVAC Feasibility Study
Valencia State CollegeEast Campus, Orlando, FLChilled Water System Feasibility Study
Valencia State CollegeBuilding D, Osceola Campus, Kissimmee, FLCafeteria Power Feasibility Study
School District of Palm Beach County Pahokee High School, Palm Beach, FLFacility Condition Assessment
School District of Palm Beach County West Technical Education Center, Belle Glade, FLAssessment & Feasibility Study
St. Lucie Public Schools St. Lucie K-8, Port Saint Lucie, FLFeasibility Study
St. Lucie Public Schools Southern Oaks Middle School, Port Saint Lucie, FLFeasibility Study
Martin County School District Jensen Beach School, Jensen Beach, FLFeasibility Study
Martin County School District South Fork High School, Stuart, FLCastaldi Report
Florida Atlantic UniversityBS12 Renovation, Boca Raton, FLFeasibility Study
Florida Atlantic UniversityGenerator Reconfiguration, Boca Raton, FLFeasibility Study & Report
University of St. Augustine Health Sciences Building, St. Augustine, FLDue Diligence Report
GOVERNMENT FACILITIES
Social Security Administration Center CFD, Baltimore, MD Computational Fluid Dynamic (CFD) Analysis and a Disaster Mitigation Study
Okeechobee CountyAll County Buildings, Okeechobee, FL Facilities UV Report
Okeechobee CountyHealth Department, Okeechobee, FLHVAC Feasibility Report
West Palm Beach
Court Building Renovation Analysis, West
Palm Beach, FL
The City of Jupiter Community Center, Jupiter, FLDue Diligence Report
Palm Beach County DramaWorks Theater, West Palm Beach, FLComplete Assessment and Feasibility Study of HVAC Systems
Palm Beach Sheriff’s Office HQ Annex, Palm Beach, FLDue Diligence Report
Osceola County Command Center Conversion, Kissimmee, FLMEP Feasibility Study
Florida Highway PatrolTroop D Headquarters, Cocoa, FLRoof Replacement Feasibility Study
Florida Highway PatrolOrlando I-Drive Facility, Orlando, FLDue Diligence Report & Facility Assessment
Health Management Associates Health Managerment Associates Headquarters, Naples, FLBuilding Assessment & Feasibility Report
US General Services AdministrationCourthouse, San Francisco, CAFeasibility Study
Social Security AdministrationMain Complex, Washington, D.C.Short Circuit & Operations Coordination & Feasibility Study
Social Security Administration14A10 MATSSC, Washington, D.C.Generator Exhaust Stack Feasibility Study
Social Security Administration14A7 MATSS, Washington, D.C.AHU Reconditioning Feasibility Study
GEO Group/Florida Department of Corrections South Bay Correctional Facility, South Bay, FLPlumbing Investigation & Feasibility Study
Volusia County Transfer Station Feasibility Study, Deland, FL
Osceola County Publix Feasibility Study, Kissimmee, FL
AIRPORT
San Francisco International AirportGBAS Feasibility Study, San Francisco, CA
San Francisco International AirportSuperbay Hangar, San Francisco, CA Hangar Door Brake Feasibility Study
San Francisco International Airport Professional Services for NFPA 25 Airfield San Francicso, CABuilding Survey and Development of Test Procedures
COUNTRY CLUBS
Lexington Country ClubCountry Club Retirement Community, Fort
Myers, FLPlumbing DWV Assessment & Feasibility Report
Moorings Park at Grey Oaks Country Club Retirement Community,
Naples, FLPlumbing Assessment & Feasibility Report
Harbour Ridge Country Club - Fitness Center, Palm City, FLFeasibility Study
Harbour Ridge Country Club - Club House, Palm City, FL
Feasibility Study
McArthur Golf Club
Due Diligence Report, Hobe Sound, FL
OTHER
Self Help Credit UnionDue Diligence Assessment & Feasibility Study, Deland, FL
Ivy City SmokehouseSite Survey & Feasibility Study, Washington,
D.C.
NexAir Plant
GBAS Feasibility Study, Orlando, FL
Hard Rock Hotel Resort
Hard Rock Hotel Punta Cana, Dominican RepublicMechanical and Electrical Energy &
Feasibility Study
MASTER PLANNING PROJECTS
Daytona State CollegeMasterplan, Deltona Campus, Deltona, FL
Florida Gulf Coast UniversityMasterplan, Ft. Myers, FL
San Francisco International Airport Superbay Hangar Fire Protection, Master
Plan, San Francisco, CA
GOVERNMENT FACILITIES
Social Security AdministrationAdministration Building, Altmeyer, Washington, D.C.
EHR Water Pressure Study
St. Lucie County
Library Branch Assessment, Port Saint Lucie, FL
EDUCATIONAL FACILITIES
Valencia State CollegeBuilding 4, East Campus, Orlando, FLEnergy Study
Flagler County Public SchoolsRymfrie Elementary School, Palm Coast, FLInvestigation Study
School District of Osceola County Bellalago Academy, Kissimmee, FLCentral Energy Plant Acoustical Analysis
Florida SouthWestern University State CollegeCommunication System, Fort Myers, FLSite Survey & Report
Florida SouthWestern University State CollegeLee Campus Building V, Fort Myers, FLMEP Assessment Report
Florida Gulf Coast UniversityMerwin Hall Faculty, Fort Myers, FLMEP Assessment Report
School District of Osceola CountyKissimmee Elementary School, Kissimmee, FLAHU-5.2 Analysis & Recommendations
Florida Gulf Coast UniversitySeidler Hall, Fort Myers, FLField Survey
Charlotte County Public SchoolsDeep Creek Elementary School, Punta Gorda, FLPower Assessment
Miami-Dade CollegeWest Campus, Miami, FLCEP CH-3 Pump Analysis
Valencia State College West Campus Chilled Water Distribution, Orlando, FL
Chipola State CollegeCampus Chilled Water Distribution, Marianna, FL
Indian River State CollegeChilled Water Distribution, Main Campus, Fort Pierce, FL
Embry Riddle Aeronautical University MicaPlex Advanced Aerodynamics Laboratory, Daytona Beach, FLChilled Water & Thermal Storage System
Florida Polytechnic UniversityChilled Water Distribution, Lakeland, FL
OTHER
Bar Tulia at MercatoHVAC Assessment, Naples, FL
Surferider CondominiumsFire Pump Study, Indialantic, FL
Palm BeachDramaWorks Theater, West Palm Beach, FLHVAC Assessment
PAST RECORD & PROJECT EXPERIENCE OF FEASIBILITY STUDIES & ASSESSMENTS
C P Z FINANCIAL STABILITY AND STATEMENTS
CPZ ARCHITECTS, INC.
4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317
1601 BELVEDERE RD., S-350, WEST PALM BEACH, FL 33406
200 N. EL MAR DRIVE, SUITE 201B, JENSEN BEACH, FLORIDA 34957
(954) 792-8525 AA# 26000685 WWW.CPZARCHITECTS.
COM
CPZ Architects, Inc. has been in business for over 19 years and is a growing financially viable company.
Its founder, Chris Zimmerman, believes in having no debt and paying all his bills in a timely manner.
This philosophy has carried us through the tough times of the past recession, and we are still as
financially strong as we were before.
Our Dun and Bradstreet number is #15-721-5455 however, we do not subscribe to Dun and
Bradstreet so you may not be able to gather up to date information from them. We would be
more than willing to provide any information that you require.
Based on our great credit history, we have had a substantial line of credit with Bank of America.
However, our company has been properly managed and has not ever needed to tap this resource. Please
call John Vasquez, our Client Manager at 888-852-5000 Ext. 3275.
CPZ Architects is a stable and sound company with a staff of 17 employees, some of whom have worked
for the company for over 8 years.
CPZ Architects isn’t nor ever has been involved with any bankruptcy proceedings and as a testament to
our well run and professional office, WE HAVE NEVER HAD ANY LITIGATION AGAINST US
AND WE HAVE NEVER BEEN INVOLVED IN ANY PRIOR OR CURRENT BANKRUPTCY
PROCEEDINGS.
Summary:
• Single Owner Firm
• Cash Assets/Reserve Fund
• Credit Line that has never been used
• Owner owned office building
• NO DEBT, our office does not lease or rent any equipment. Everything is paid in full
• Firm has no outstanding loans
• Never failed to pay employees or consultants.
CPZ Architects has submitted our Profit and Loss statements for the last three years. As shown our firm
is in financially stable and a statement from our accountant will be provided if required.
Jan - Dec 18
Ordinary Income/Expense
Income
1222 · Retainage -11,589.10
4100 · Project Revenue 2,679,489.00
4110 · Print Services 10,449.00
4130 · Reimbursables 40,250.91
4200 · Bad Debt -4,860.50
Total Income 2,713,739.31
Cost of Goods Sold
5100 · Consultants
Civil Engineer 128,066.42
Cost Estimating 68,788.53
Landscape Architect 134,226.47
LEED commissioning 2,335.00
MEP Consultant 329,768.39
Parking 28,355.00
Pool Consultant 15,875.00
Structural Engineer 243,365.61
Surveyor 126,878.60
Testing Services 28,626.42
Traffic 1,290.50
5100 · Consultants - Other 56,970.03
Total 5100 · Consultants 1,164,545.97
5101 · Contractor 2,000.00
5210 · Bid Fees 1,680.00
5400 · Permiting Fees 1,754.45
5500 · Printing and Reproduction 4,142.81
5600 · Reimburseable Expenses 20.00
Total COGS 1,174,143.23
Gross Profit 1,539,596.08
Expense
6100 · Advertising Expense 4,189.08
6120 · Car/Truck Expense
Gas & Oil 3,137.90
Mileage 3,967.55
Repairs & Maintenance 425.92
Tolls and Parking 977.88
Total 6120 · Car/Truck Expense 8,509.25
6130 · Cleaning/Janitorial 4,364.00
6140 · Computer Hardware 1,028.16
6150 · Computer Software 23,845.96
6160 · Computer Supplies 3,935.81
6170 · Computer Support 13,636.89
6180 · Contributions
PAC 3,400.00
6180 · Contributions - Other 2,901.14
Total 6180 · Contributions 6,301.14
6190 · Depreciation Expense 27,298.32
6200 · Dues and Subscriptions 5,626.59
6210 · Education 734.00
6220 · Flowers 323.21
6230 · Gifts 2,428.38
6240 · Insurance
Auto Insurance 1,870.02
Dental Insurance 2,382.23
General Liability Insurance 2,900.89
10:39 AM CPZ Architects, Inc.
11/29/21 Profit & Loss
Cash Basis January through December 2018
Page 1
Jan - Dec 18
Health Insurance
Officer 0.00
Health Insurance - Other 38,773.93
Total Health Insurance 38,773.93
Key Man Insurance 3,575.00
Professional Liability Insuranc 25,700.10
Umbrella 435.00
Vision Insurance 662.47
Worker's Compensation 2,828.23
Total 6240 · Insurance 79,127.87
6250 · Licenses and Permits 1,036.24
6255 · Marketing 5,229.77
6260 · Meals & Entertainment 7,302.43
6270 · Meetings 4,052.84
6275 · Merchant Fees 1,171.96
6280 · Miscellaneous 0.00
6290 · Office Operating Expenses 453.00
6292 · Office Expense 349.99
6295 · Office Supplies 12,990.26
6300 · Payroll Expenses
Payroll Processing Fees 776.00
Total 6300 · Payroll Expenses 776.00
6330 · Postage and Delivery 1,395.42
6350 · Professional Development 3,986.50
6360 · Professional Fees
Accounting Fees 7,294.98
Consulting Fees 4,000.00
6360 · Professional Fees - Other 1,030.00
Total 6360 · Professional Fees 12,324.98
6370 · Photographs 1,000.00
6390 · Promotion - Boat 1,026.90
6400 · Rent 83,376.00
6410 · Repairs and Maintenance
Equipment Repairs 1,430.90
Office Repairs 95.51
Total 6410 · Repairs and Maintenance 1,526.41
6420 · Security Systems & Monitoring 929.16
6440 · Tax - Property 85.30
6460 · Telephone/Internet Costs
Cell Phone 4,475.47
6460 · Telephone/Internet Costs - Other 6,345.39
Total 6460 · Telephone/Internet Costs 10,820.86
6470 · Travel 2,083.88
6480 · Uniforms 619.24
6490 · Utilities 8,930.83
6500 · Wages - Non Project Related
Payroll Tax Expenses
FICA 62,815.11
FUTA 672.00
SUTA 112.00
Total Payroll Tax Expenses 63,599.11
Wages - Office Staff 639,016.27
Wages - Officer Salary 291,926.86
Total 6500 · Wages - Non Project Related 994,542.24
10:39 AM CPZ Architects, Inc.
11/29/21 Profit & Loss
Cash Basis January through December 2018
Page 2
Jan - Dec 18
6550 · 401K Profit Sharing
Profit Sharing Contribution 39,970.42
Safe Harbor Contribution 20,243.13
Total 6550 · 401K Profit Sharing 60,213.55
6560 · Website Costs 1,840.00
8100 · void 0.00
Total Expense 1,399,412.42
Net Ordinary Income 140,183.66
Other Income/Expense
Other Income
7000 · Other Income
Interest Income 58.13
Total 7000 · Other Income 58.13
Total Other Income 58.13
Other Expense
8000 · Other Expense
Interest Expense 8.85
Total 8000 · Other Expense 8.85
Total Other Expense 8.85
Net Other Income 49.28
Net Income 140,232.94
10:39 AM CPZ Architects, Inc.
11/29/21 Profit & Loss
Cash Basis January through December 2018
Page 3
Jan - Dec 19
Ordinary Income/Expense
Income
1222 · Retainage -6,770.33
4100 · Project Revenue 2,931,221.12
4110 · Print Services 29,988.84
4130 · Reimbursables 20,040.14
4200 · Bad Debt -5,977.50
Total Income 2,968,502.27
Cost of Goods Sold
5100 · Consultants
Civil Engineer 165,481.80
Cost Estimating 25,876.20
Landscape Architect 156,049.48
LEED commissioning 18,365.00
MEP Consultant 338,819.89
Parking 19,377.35
Pool Consultant 12,625.00
Structural Engineer 200,377.17
Surveyor 84,280.00
Testing Services 38,740.92
5100 · Consultants - Other 62,971.00
Total 5100 · Consultants 1,122,963.81
5101 · Contractor 2,200.00
5210 · Bid Fees 2,555.00
5220 Travel job cost 3,245.85
5400 · Permiting Fees 500.00
5500 · Printing and Reproduction 2,845.22
Total COGS 1,134,309.88
Gross Profit 1,834,192.39
Expense
Promotions 669.55
6100 · Advertising Expense 6,867.92
6110 · Bank Service Charges 27.80
6120 · Car/Truck Expense
Gas & Oil 2,945.26
Lease 4,464.00
Mileage 3,019.95
Repairs & Maintenance 1,987.91
Tolls and Parking 817.58
Total 6120 · Car/Truck Expense 13,234.70
6130 · Cleaning/Janitorial 4,511.00
6140 · Computer Hardware 2,826.04
6150 · Computer Software 26,485.73
6160 · Computer Supplies 1,193.05
6170 · Computer Support 13,190.98
6180 · Contributions
PAC 500.00
Total 6180 · Contributions 500.00
6190 · Depreciation Expense 49,864.38
6200 · Dues and Subscriptions 4,946.18
6210 · Education 4,894.74
6220 · Flowers 251.38
6230 · Gifts 2,263.46
6240 · Insurance
Auto Insurance 3,440.87
Dental Insurance 3,201.00
General Liability Insurance 2,951.95
10:39 AM CPZ Architects, Inc.
11/29/21 Profit & Loss
Cash Basis January through December 2019
Page 1
Jan - Dec 19
Health Insurance
Officer 0.00
Health Insurance - Other 70,064.74
Total Health Insurance 70,064.74
Key Man Insurance 3,575.00
Professional Liability Insuranc 20,502.00
Umbrella 1,575.00
Vision Insurance 1,021.20
Worker's Compensation 4,022.00
Total 6240 · Insurance 110,353.76
6250 · Licenses and Permits 921.63
6255 · Marketing 4,332.02
6260 · Meals & Entertainment 9,719.89
6265 · Sponsorship 5,065.00
6270 · Meetings 7,728.01
6275 · Merchant Fees 1,899.99
6280 · Miscellaneous 0.00
6290 · Office Operating Expenses 263.42
6292 · Office Expense 318.00
6295 · Office Supplies 14,868.36
6300 · Payroll Expenses
Payroll Processing Fees 780.00
Total 6300 · Payroll Expenses 780.00
6330 · Postage and Delivery 1,380.90
6350 · Professional Development 3,505.03
6360 · Professional Fees
Accounting Fees 7,938.49
Consulting Fees 13,500.00
6360 · Professional Fees - Other 2,006.60
Total 6360 · Professional Fees 23,445.09
6370 · Photographs 1,500.00
6390 · Promotion - Boat 928.76
6400 · Rent 98,900.00
6410 · Repairs and Maintenance
Equipment Repairs 3,488.69
Office Repairs 2,485.39
Total 6410 · Repairs and Maintenance 5,974.08
6420 · Security Systems & Monitoring 947.44
6440 · Tax - Property 718.70
6460 · Telephone/Internet Costs
Cell Phone 3,315.09
6460 · Telephone/Internet Costs - Other 6,223.18
Total 6460 · Telephone/Internet Costs 9,538.27
6470 · Travel 3,942.47
6480 · Uniforms 1,191.73
6490 · Utilities 9,155.19
6500 · Wages - Non Project Related
Payroll Tax Expenses
FICA 70,831.81
FUTA 755.25
SUTA 125.87
Payroll Tax Expenses - Other 0.00
Total Payroll Tax Expenses 71,712.93
10:39 AM CPZ Architects, Inc.
11/29/21 Profit & Loss
Cash Basis January through December 2019
Page 2
Jan - Dec 19
Wages - Office Staff 731,779.88
Wages - Officer Salary 293,142.85
Total 6500 · Wages - Non Project Related 1,096,635.66
6550 · 401K Profit Sharing
Profit Sharing Contribution 59,548.05
Safe Harbor Contribution 25,837.00
Total 6550 · 401K Profit Sharing 85,385.05
6560 · Website Costs 1,779.50
8100 · void 0.00
Total Expense 1,632,904.86
Net Ordinary Income 201,287.53
Other Income/Expense
Other Income
7000 · Other Income
Interest Income 112.43
Total 7000 · Other Income 112.43
Total Other Income 112.43
Net Other Income 112.43
Net Income 201,399.96
10:39 AM CPZ Architects, Inc.
11/29/21 Profit & Loss
Cash Basis January through December 2019
Page 3
Jan - Dec 20
Ordinary Income/Expense
Income
1222 · Retainage -47,885.85
4100 · Project Revenue 3,754,475.45
4110 · Print Services 7,770.66
4130 · Reimbursables 34,056.09
4200 · Bad Debt -0.13
Total Income 3,748,416.22
Cost of Goods Sold
5100 · Consultants
Low Voltaget 1,325.00
Building Envelope 12,500.00
Civil Engineer 281,564.72
Cost Estimating 154,492.40
Design Consultant 109,419.75
Landscape Architect 45,762.30
LEED commissioning 6,355.00
MEP Consultant 393,111.16
Structural Engineer 235,704.86
Surveyor 47,033.18
Testing Services 102,640.77
Traffic 5,908.00
5100 · Consultants - Other 84,567.47
Total 5100 · Consultants 1,480,384.61
5101 · Contractor 961.00
5210 · Bid Fees 2,540.00
5220 Travel job cost 602.37
5400 · Permiting Fees 4,684.25
5500 · Printing and Reproduction 2,164.09
Total COGS 1,491,336.32
Gross Profit 2,257,079.90
Expense
6102 · Recruitment Expense 5,921.11
6380 · Finance Charges 195.16
Promotions 5,240.00
6100 · Advertising Expense 797.15
6111 · Bank Error 2,718.43
6120 · Car/Truck Expense
Gas & Oil 2,158.19
Lease 5,952.00
Mileage 1,362.38
Registration & License 144.35
Repairs & Maintenance 2,658.96
Tolls and Parking 682.56
Total 6120 · Car/Truck Expense 12,958.44
6130 · Cleaning/Janitorial 4,891.00
6140 · Computer Hardware 4,539.25
6150 · Computer Software 43,289.55
6160 · Computer Supplies 2,432.93
6170 · Computer Support 19,875.34
6180 · Contributions
PAC 1,000.00
Total 6180 · Contributions 1,000.00
6190 · Depreciation Expense 45,626.75
6200 · Dues and Subscriptions 5,304.08
6210 · Education 718.95
6220 · Flowers 476.04
6230 · Gifts 4,333.23
10:38 AM CPZ Architects, Inc.
11/29/21 Profit & Loss
Cash Basis January through December 2020
Page 1
Jan - Dec 20
6240 · Insurance
Auto Insurance 3,980.46
Dental Insurance 3,743.22
General Liability Insurance 3,365.36
Health Insurance
Officer 0.00
Health Insurance - Other 75,018.90
Total Health Insurance 75,018.90
Key Man Insurance 3,575.00
Professional Liability Insuranc 22,889.00
Umbrella 1,140.00
Vision Insurance 1,165.36
Worker's Compensation 2,942.00
6240 · Insurance - Other -46.38
Total 6240 · Insurance 117,772.92
6250 · Licenses and Permits 1,164.54
6255 · Marketing 939.31
6260 · Meals & Entertainment 4,267.34
6265 · Sponsorship 3,475.00
6270 · Meetings 5,079.33
6275 · Merchant Fees 1,503.83
6280 · Miscellaneous 0.00
6290 · Office Operating Expenses 2,616.12
6292 · Office Expense 398.00
6293 · Covid 19 Expenses 5,272.00
6295 · Office Supplies 19,529.88
6300 · Payroll Expenses
Payroll Processing Fees 901.00
Total 6300 · Payroll Expenses 901.00
6330 · Postage and Delivery 1,677.55
6350 · Professional Development 2,391.81
6360 · Professional Fees
Accounting Fees 8,951.40
Consulting Fees 21,500.00
Legal Fees 3,468.00
6360 · Professional Fees - Other 770.00
Total 6360 · Professional Fees 34,689.40
6370 · Photographs 3,874.90
6390 · Promotion - Boat 505.41
6400 · Rent 94,540.00
6410 · Repairs and Maintenance
Equipment Repairs 3,974.40
Office Repairs 8,320.17
6410 · Repairs and Maintenance - Other 103.98
Total 6410 · Repairs and Maintenance 12,398.55
6420 · Security Systems & Monitoring 961.24
6440 · Tax - Property 438.80
6460 · Telephone/Internet Costs
Cell Phone 3,461.75
6460 · Telephone/Internet Costs - Other 6,925.08
Total 6460 · Telephone/Internet Costs 10,386.83
6470 · Travel 384.88
6480 · Uniforms 1,542.74
6490 · Utilities 8,781.94
6500 · Wages - Non Project Related
COVID Paid Leave Family 11,461.14
10:38 AM CPZ Architects, Inc.
11/29/21 Profit & Loss
Cash Basis January through December 2020
Page 2
Jan - Dec 20
Payroll Tax Expenses
FICA 87,149.97
FUTA 882.00
SUTA 147.00
Payroll Tax Expenses - Other 0.00
Total Payroll Tax Expenses 88,178.97
Wages - Office Staff 905,725.96
Wages - Officer Salary 342,883.62
Total 6500 · Wages - Non Project Related 1,348,249.69
6550 · 401K Profit Sharing
Profit Sharing Contribution 75,115.25
Safe Harbor Contribution 25,300.34
Total 6550 · 401K Profit Sharing 100,415.59
6560 · Website Costs 599.40
6565 · Social Media 5,400.00
8100 · void 0.00
Total Expense 1,950,475.41
Net Ordinary Income 306,604.49
Other Income/Expense
Other Income
PPP Loan Forgiveness 210,500.00
7000 · Other Income
COVID refund 4,077.88
Interest Income 268.15
Total 7000 · Other Income 4,346.03
Total Other Income 214,846.03
Net Other Income 214,846.03
Net Income 521,450.52
10:38 AM CPZ Architects, Inc.
11/29/21 Profit & Loss
Cash Basis January through December 2020
Page 3
LETTER OF RECOMMENDATION
TO WHOM IT MAY CONCERN:
Mark Curran Fire Chief
August 3, 2012
The Coral Springs Fire Department has had the pleasure to work with CPZ Architects, Inc. on three
different projects. The first was Fire Station 80, which is our main fire station located on Coral Springs
Drive. This particular design received honorable mention from FIRE CHIEFS magazine, for Fire Station
Design 2012. This was quite an accomplishment considering they were competing with Architects from
across the country. The second project was Fire Station 64 located on Ramblewood Drive, both of the
stations were new construction. The third project was a computer room project located in the Fire
Training Center.
CPZ was very professional and worked very well with the end users (firefighters), on the design and
their needs, allowing them to operate out of a station for 24 hours at a time. The firm was very
responsive to issues that came up during construction and were very amenable.
I have been with the City of Coral Springs for 28 years and have to say that CPZ is one of the best firms
the city has ever hired.
Sincerely,
Fire Chief Curran
Delray Beach
Police Department
300 West Atlantic Avenue
Delray Beach, Florida 33444-3695
(561) 243-7888 Fax (561) 243-7816
Delray Beach
Florida
b01- 11H11fficaffl)
• \Ir,_¡
Jeffrey S. Goldman
Chief of Police
Accredited
Since 2004 1993•2001•2017
September 28, 2018
To whom it may concern:
Re: Letter of Recommendation for CPZ Architects, Inc.
The Delray Beach Police Department has been diligently working with CPZ Architects, Inc. in
reference to an Assessment Report on the expansion and/or replacement of the existing facility. Representatives
of CPZ Architects, Inc., have met with members of Command Staff and generated a questionnaire to determine the
"needs assessment" for space allocations required for all of our personnel. Through staff interviews and detailed
examination of our current facilities, they completed a detailed report and presentation which included options for
the future structure of the Police Department that would better meet our needs.
During our continued collaboration on this project, CPZ Architects, Inc. representatives have
been diligent, responsive and have taken into consideration our feedback and our requirements. CPZ Architects,
Inc. is a firm that has been very responsible and always has the client's best interest in mind.
We would highly recommend CPA Architect's Inc. for any of your future project.
Sincerely,
MO/bes
L.E.A.D. the Way!
Learning, Excellence, Accountability, and Diversity
REFERENCES
May 8, 2020
Collier County EMS
8075 Lely Cultural Parkway, Suite: #267
Naples, FL 34113
Re: OCI Associates, Inc.
To Whom It May Concern:
I am pleased to take this opportunity to recommend OCI Associates, Inc. My experience with this
engineering firm was during the construction of our recent fire station on Captiva Island. The
project was a complex design in order to meet the demands of the Fire District. The Captiva
station is the only one on the island, which meant it had to function in many roles for the
administration, operations, and training staff.
The challenge we presented for the MEP design was that we wanted the building to be as green
and mechanically efficient as possible. The station would have to function as our EOC after a
catastrophic event such as hurricane while running on generator power for potentially 2-3 weeks.
This meant we had to use as little power as necessary to operate while at the same time
providing power to the entire station for crews to live and work in. We also wanted the fire
protection system to be designed with a separate training module built-in to supply our training
stairwell. The system needed to provide protection to the facility while at the same time having a
section not active in order to operate in a training scenario. I feel in conjunction with Sweet
Sparkman Architects, OCI did a fantastic job meeting these demands for us.
In closing, I would like to recommend OCI Associates as a very effective and professional
engineering firm, and I wish you well in your project.
Respectfully,
Jeff Pawul, Fire Chief
Captiva Island Fire District
239-472-9494 x203
jpawul@captivafire.com
REFERENCES
REFERENCES
C P Z
CPZ ARCHITECTS, INC.
4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317
200 N. EL MAR DRIVE, SUITE 200, JENSEN BEACH, FLORIDA 34957
(954) 792-8525
AA #26000685 WWW.CPZARCHITECTS.COM
CPZ ARCHITECTS AWARDS
C P Z
CPZ ARCHITECTS, INC.
4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317
200 N. EL MAR DRIVE, SUITE 200, JENSEN BEACH, FLORIDA 34957
(954) 792-8525
AA #26000685 WWW.CPZARCHITECTS.COM
CPZ ARCHITECTS AWARDS
C P Z
CPZ ARCHITECTS, INC.
4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317
200 N. EL MAR DRIVE, SUITE 200, JENSEN BEACH, FLORIDA 34957
(954) 792-8525
AA #26000685 WWW.CPZARCHITECTS.COM
CPZ ARCHITECTS AWARDS
C P Z
CPZ ARCHITECTS, INC.
4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317
200 N. EL MAR DRIVE, SUITE 200, JENSEN BEACH, FLORIDA 34957
(954) 792-8525
AA #26000685 WWW.CPZARCHITECTS.COM
CPZ ARCHITECTS AWARDS
C P Z
CPZ ARCHITECTS, INC.
4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317
200 N. EL MAR DRIVE, SUITE 200, JENSEN BEACH, FLORIDA 34957
(954) 792-8525
AA #26000685 WWW.CPZARCHITECTS.COM
CPZ ARCHITECTS AWARDS
C P Z
CPZ ARCHITECTS, INC.
4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317
200 N. EL MAR DRIVE, SUITE 200, JENSEN BEACH, FLORIDA 34957
(954) 792-8525
AA #26000685 WWW.CPZARCHITECTS.COM
CPZ ARCHITECTS AWARDS
C P Z
CPZ ARCHITECTS, INC.
4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317
200 N. EL MAR DRIVE, SUITE 200, JENSEN BEACH, FLORIDA 34957
(954) 792-8525
AA #26000685 WWW.CPZARCHITECTS.COM
CPZ ARCHITECTS AWARDS
C P Z
CPZ ARCHITECTS, INC.
4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317
200 N. EL MAR DRIVE, SUITE 200, JENSEN BEACH, FLORIDA 34957
(954) 792-8525
AA #26000685 WWW.CPZARCHITECTS.COM
CPZ ARCHITECTS AWARDS
C P Z
CPZ ARCHITECTS, INC.
4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317
1601 BELVEDERE RD., S-350, WEST PALM BEACH, FL 33406
200 N. EL MAR DRIVE, SUITE 201B, JENSEN BEACH, FLORIDA 34957
(954) 792-8525 AA# 26000685 WWW.CPZARCHITECTS. COM
LICENSES & CERTIFICATIONS
CPZ Architects, Inc.- All Florida
State of Florida Department of State P02000128253
Licenses Florida Department of Professional Regulation
CPZ Architects, Inc. AA26000685
Chris P. Zimmerman AR0010995
CBE Certification See Tab 19
U.S. Green Bldg. Council CPZ Architects
Broward County Taxes Receipt # 316-353
Receipt #1CP-16-00021914
Plantation Tax Certificate Account #OC0203663
Moffatt & Nichol Licenses- All Florida
State of Florida, Department of State P06383
Licenses Florida Department of Professional Regulation
M&N #4877
Lawrence Derose #20169
Ludovic Biner #72274
LEED Accredited Professional Certification April 6, 2009
OCI Engineering, LLC- All Florida
State of Florida, Department of State L06000089796
Sudama Wijegunawardana, PE #63143
Jason Smith, PE #57743
Amir Kazeminia, PE #42619
Construction Management Services (CMS)
State of Florida Department of State: 659282
Licenses Florida Department of Professional Regulation: NA
Copies of actual licenses are available upon request.
5. NAME OF FIRM
PART I - CONTRACT-SPECIFIC QUALIFICATIONS
ARCHITECT - ENGINEER QUALIFICATIONS
A. CONTRACT INFORMATION
1. TITLE AND LOCATION (City and State)
2. PUBLIC NOTICE DATE 3. SOLICITATION OR PROJECT NUMBER
B. ARCHITECT-ENGINEER POINT OF CONTACT
C. PROPOSED TEAM
(Complete this section for the prime contractor and all key subcontractors.)
4. NAME AND TITLE
8. E-MAIL ADDRESS7. FAX NUMBER6. TELEPHONE NUMBER
(Check)PRIMEJ-V PARTNERSUBCON- TRACTOR9. FIRM NAME 10. ADDRESS 11. ROLE IN THIS CONTRACT
a.
b.
c.
d.
e.
f.
(Attached)D. ORGANIZATIONAL CHART OF PROPOSED TEAM
CHECK IF BRANCH OFFICE
CHECK IF BRANCH OFFICE
CHECK IF BRANCH OFFICE
CHECK IF BRANCH OFFICE
CHECK IF BRANCH OFFICE
CHECK IF BRANCH OFFICE
Chris P. Zimmerman, AIA, President
CPZ Architects, Inc.
954-792-8525 NA Chris@cpzarchitects.com
CPZ Architects, Inc.4316 W. Broward Blvd. Architect
Plantation, Florida
Moffatt & Nichol Structural Engineer100 W Cypress Creek Road,
Suite 960
Fort Lauderdale, FL 33309
OCI & Associates MEP Engineer777 Brickell Ave. Suite 500
Miami, FL 33131
X
g.
CHECK IF BRANCH OFFICE
X
X
X
Space Needs Assessment and Site Feasibility Study
RFQ 21-10-01
X
CMS-Constructionb Management Services
10 Fairway Drive Suite 301 Deerfield Beach, FL 33441 Cost Estimator
STANDARD FORM 330 (REV. 8/2016)
ARCHITECT-ENGINEER QUALIFICATIONS
1. SOLICITATION NUMBER (If any)
PART II – GENERAL QUALIFICATIONS
(If a firm has branch offices, complete for each specific branch office seeking work.)
2a. FIRM (OR BRANCH OFFICE) NAME Moffatt & Nichol 3. YEAR ESTABLISHED 2019 4. UNIQUE ENTITY IDENTIFIER 117035044
2b. STREET 100 W. Cypress Creek Road, Suite 960 5. OWNERSHIP
2c.CITY Fort Lauderdale 2d. STATE FL 2e. ZIP CODE 33309-2115 a. TYPE Corporation
b. SMALL BUSINESS STATUS
6a. POINT OF CONTACT NAME AND TITLE
Kenneth Parkinson, AICP , Vice President 7. NAME OF FIRM (If block 2a is a branch office) Moffatt & Nichol 6b. TELEPHONE NUMBER
(954) 622-8100
6c. E-MAIL ADDRESS
kparkinson@moffattnichol.com
8a. FORMER FIRM NAME(S) (If any) 8b. YR. ESTABLISHED 8c. UNIQUE ENTITY IDENTIFIER
10. PROFILE OF FIRM’S EXPERIENCE AND
ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS
a. Function
Code b. Discipline c. No. of Employees a. Profile
Code b. Experience c. Revenue Index
Number (see below) (1) FIRM (2) BRANCH
02 Administration 120 1 C07 Coastal Engineering 2
08 CADD Technician 77 D04 Design -Build Preparation of RFPs 1
12 Civil Engineer 76 D08 Dredging Studies & Design 1
15/16 Construction Inspector/Manager 11 E03 Electrical Studies & Design 1
21 Electrical Engineer 21 E09 EIS, EA, Environmental Statements 2
23/24 Environmental Engineer/Scientist 26 H01 Harbors; Jetties; Piers; Ship Terminals 1
27 Foundation/Geotechnical Engineer 5 P05 Planning (Community, Regional) 1
29 GIS Specialist 6 P06 Planning (Site, Installation, & Project) 1
42 Mechanical Engineer 10 M02 Materials Handling Systems 1
47 Planner: Urban/Regional (Waterfront) 6 R04 Recreation Facilities (Parks, Marinas) 2
48 Project Manager 35 1 R11 Rivers; Canals; Flood Control 1
57 Structural Engineer 183 S13 Stormwater Handling & Facilities 1
60 Transportation Engineer 47 1 W02 Water Resources; Groundwater 1
62 Water Resources Engineer 23 Civil Site Work 1
Coastal/Hydraulic Engineer/Scientist 76 1 Lake Reh abilitation & Management 1
Dredging Specialist/Engineer 5 Mathematical Modeling 1
NEPA Planners 4 Wetlands 1
Port Planner/Engineer 13 1
Rail Engineer/Specialist 15
Transportation Economist 8
Transportation Planner 2
Other Employees 67
Total 835 5
11. ANNUAL AVERAGE PROFESSIONAL
SERVICES REVENUES OF ENTIRE FIRM
FOR LAST 3 YEARS
(Insert revenue index number shown at right)
PROFESSIONAL SERVICES REVENUE INDEX NUMBER
1. Less than $100,000 6. $2 million to less than $5 million
2. $100,000 to less than $250,000 7. $5 million to less than $10 million
3. $250,000 to less than $500,000 8. $10 million to less than $25 million
4. $500,000 to less than $1 million 9. $25 million to less than $50 million
5. $1 million to less than $2 million 10. $50 million or greater
a. Federal Work 8
b. Non-Federal Work 10
c. Total Work 10
12. AUTHORIZED REPRESENTATIVE
The foregoing is a statement of facts.
a. SIGNATURE
b. DATE
02/01/2021
c. NAME AND TITLE
Kenneth Parkinson, A ICP , Vice President
ARCHITECT-ENGINEER QUALIFICATIONS 1. SOLICITATION NUMBER (If any)RFQ# 21-10-01
PART II – GENERAL QUALIFICATIONS
2a. FIRM (OR BRANCH OFFICE) NAME
OCI Associates, Inc.
3. YEAR ESTABLISHED
1987
4. DUNS NUMBER
959734864
2b. STREET
600 S. Orlando Avenue 5. OWNERSHIP
a. TYPE
Corporation
b. SMALL BUSINESS STATUS
Federal (Self Certified)
2c. CITY
Maitland
2d. STATE
FL
2e. ZIP
32751
6a. POINT OF CONTACT NAME AND TITLE
Amir Kazeminia, PE, President + CEO
6b. TELEPHONE NUMBER
407-332-5110
6c. E-MAIL ADDRESS
amir@ociassociates.com
7. NAME OF FIRM (If block 2a is a branch office)
N/A
8a. FORMER FIRM NAMES(S) (If any)
N/A
8b. YR. ESTABLISHED
N/A
8c. DUNS NUMBER
N/A
9. EMPLOYEES BY DISCIPLINE 10. PROFILE OF FIRM’S EXPERIENCES AND ANNUAL AVERAGE REVENUE FOR LAST 5 YEARS
a. Function Code b. Discipline c. No. of Employees a. Profile
Code b. Experience c. Revenue Index Number
(see below)(1) FIRM (2) BRANCH
02 Administration 10 A05 Airports, Terminals and Hangars 5
08 CAD Technicians 06 C06 Churches; Chapels 1
13 Communications Engineers 02 C10 Commercial Buildings (low rise)4
21 Electrical Engineers 16 C11 Community Facilities 2
25 Fire Protection Engineers 02 E02 Educational Facilities (Classrooms)5
42 Mechanical Engineers 14 D07 Dining Halls, Clubs and Restaurants 5
48 Project Manager | Mechanical 05 E03 Electrical Studies and Design 5
48 Project Manager | Electrical 05 F03 Fire Protection 4
48 Project Manager | Plumb/FP 02 H04 Heating; Ventilating; Air 5
Commissioning 03 H06 Highrise 4
Plumbing Designers 07 H09 Hospitals & Medical Facilities 3
Lighting Designers 01 H10 Hotels 4
H11 Housing (Residential)4
J01 Judicial and Courtroom Facilities 1
L01 Libraries, Museums, Galleries 2
L05 Lighting (Interiors; Display)2
L06 Lighting (Exteriors; Streets)2
O01 Office Buildings; Industrial Parks 5
P07 Plumbing & Piping Design 4
P08 Prisons & Correctional Facilities 5
P13 Public Safety Facilities 6
R05 Recreation Facilities (Parks, Marinas)1
R06 Rehabilitation (Buildings) 3
Total 70 R08 Research Facilities 4
11. ANNUAL AVERAGE PROFESSIONAL SERVICES REVENUES OF
FIRM FOR LAST 3 YEARS (Insert revenue index number shown at right)PROFESSIONAL SERVICES REVENUE INDEX NUMBER
1. Less than $100,000 6. $2 million to less than $5 million
2. $100,000 to less than $250,000 7. $5 million to less than $10 million
3. $250,000 to less than $500,000 8. $10 million to less than $25 million
4. $500,000 to less than $1 million 9. $25 million to less than $50 million
5. $1 million to less than $2 million 10. $50 million or greater
a. Federal Work 5
b. Non-Federal Work 7
c. Total Work 7
12. AUTHORIZED REPRESENTATIVE The foregoing is a statement of facts.
a. SIGNATURE b. DATE
November 23rd, 2021
c. NAME AND TITLE
Amir Kazeminia, PE, President + CEO
C P Z TEAM ORGANIZATIONAL CHART
CPZ ARCHITECTS, INC.
4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317
1601 BELVEDERE RD., S-350, WEST PALM BEACH, FL 33406
200 N. EL MAR DRIVE, SUITE 200, JENSEN BEACH, FLORIDA 34957
(954) 792-8525 AA# 26000685 WWW.CPZARCHITECTS. COM
Structural Engineering
Moffett & Nichol
Larry DeRose, PE
Ludovic Binner, PE
City of Sunny Isles Beach
Prime Professional / Team Leader
CPZ Architects, Inc.
Chris P. Zimmerman, AIA, NCARB
President / Project Principal
Jayson Hall, Senior Project Manager
SBE /LEED GE
Cost Estimating
CMS – Construction Management Services,
Dan Jeffreys
SBE, MBE & CBE
Mechanical, Electrical & Plumbing
OCI Consultant Engineers
Jason Smith, PE, LEED AP BD+C, CEM, Principal
Kaz Kazeminia, NICET, Principal
Amir Kazeminia, PEGal
.
LEED ACCREDITED PROFESSIONALS
Fංඋൾ Sඍൺඍංඈඇ 50
SECTION 6
REFERENCES
Client Length Scope Examples of Accomplishments
City of Coral Springs (2006)
9500 West Sample Road
Coral Springs, Florida 33065
John Barry, Deputy Fire Chief
954-346-1284
jbarry@coralsprings.org
John Norris, Director of Public Works
JNorris@coralsprings.org
954-344-1166
16 years &
continuing
A/E
services
26 projects including
9 mill Police/Fire Facility
Kwanis Park
City Hall Urban Scape
City Hall 2nd Fl Police Office
City Hall 5th Fl renovation
City Hall Programming
Coral Spring Police Memorial
Master Planning Services
Charter School Arts Renovation
Fire Station #64, #43 & 95
Aquatic Center meeting room Addition
Aquatic Fitness Center
Maintenance Facilities
City of Tamarac (2006)
Ron Stein, Construction Project Mgr.
954-597-3716
rstein@tamarac.org
15 years &
Continuing
A/E
Services
23 projects including
Village Park Review & Schematic Study
Alazhar School Review
City Hall needs’ assessment
City Hall Commission Offices
Sunset Veterans Park
Architectural review’s various projects
Water Treatment Plant
Martin County (2020)
2555 SE Avenger Circle
Stuart, FL 34996
(772) 320-3046
Jeff Dougherty, General Services Dept.
jdougher@martin.fl.us
Kevin Landry, Facilities Operations Administr
klandry@martin.fl.us
1 year &
Continuing
Building
Architect
Fire Stations #14 & #18
K-9 Dog Kennel Facility
Feasibility Study
Building Envelope
Commission Chambers
Courthouse Improvements
Administration 2nd - 4rd Fl. renovations
Sheriff Purchasing Storage Building
Data Recovery Center
Marine Patrol Building
Stuart Beach Ocean Rescue Building
Admin Building Parks Offices
Admin Veterans Affairs
Landfill Admin Building
City of Port St. Lucie (2019)
121 SW Port St. Lucie
Port St. Lucie, Fl 34984
William T. May, Police Administrator
(772) 871-5013
Bill.May@cityofpsl.com
2 years &
Continuing
Police Lobby Building Renovations
Firing Range & Office expansion
City of Port St. Lucie (2019)
2195 SE Airoso Road
Port St. Lucie, Fl 34984
Mike Kendrick, Parks Operations Manager
(772) 871-526
MKendrick@cityofpsl.com
2 years &
Continuing
Whispering Pines Park
Minsky Gym
Sportsman Park Building
Parks Yard Building renovations
Botanical Gardens Sculpture
Public Works Study
12. NAME 13. ROLE IN THIS CONTRACT
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
14. YEARS EXPERIENCE
b. WITH CURRENT FIRMa. TOTAL
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization)
15. FIRM NAME AND LOCATION (City and State)
STANDARD FORM 330 (REV. 8/2016) PAGE 2
a.
b.
c.
d.
(1) TITLE AND LOCATION (City and State)
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
PROFESSIONAL SERVICES
e.Check if project performed with current firm(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE
19. RELEVANT PROJECTS
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
(3)
Chris P. Zimmerman Principal 38 19
CPZ Architects, Inc.
Carnegie-Mellon University
Bachelar of Architecture
Architect:
Florida, #10,995
North Carolina #9716
Louisiana #6826
NCARB CertificationFlorida AIA: American Institute of Architects
(1) TITLE AND LOCATION (City and State)
2018 TBD
Delray Beach Police Department Assessment Study, Delray Florida
The City of Delray Beach Police Department hired CPZ to complete a needs and assessment study of their existing Police Department Facilities to determine if the existing building could be renovated or based on the results of the assessment report build a new Police Facility. CPZ Architects has completed a needs basement of the Delray Beach Police Station outlining their current needs and providing an estimate of the future space needs for the next 10 years. A conceptual master plan was developed for two possible solutions to their space needs along with budgetary estimates. Option 1 included using the existing facility and expanding around the facility along with construction of parking garage. The second option was to construct a completely new multi-story facility on the back part of the site, while maintaining operation in the existing facility. Upon competition of the new facility, demolish the existing facility and construct the new parking garage. CPZ Architects has now been retained to provide a needs assessment for the City Hall and Community Center Site.
2018 2019
Broward County Consulting Services for Consolidated
Facilities Maintenance Building
2017 TBD
City of Coral Springs City Hall Programming, Coral Springs, Florida CONSTRUCTION (If applicable)
2019 2023
BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
The Delray Beach City Hall and Community Center Needs Assessment is a study project, in conjunction with Carnahan, Proctor and Cross. We are the space study entity of the project where CPC will provide the Survey of the existing facility. We are directed to define the current use of the facility then determine the future needs of the Complex as it stands today or the potential of consolidating the current users and additional users into a City Center concept. New 365 Car Garage.
The Port Everglades Department of Broward County intends to construct a new facility to consolidate Port Facilities Maintenance and Operations from the current functions that are located within various buildings throughout the Port Everglades campus into a central location. This Project is intended to locate this new facility within the physical boundary of Port Everglades on property currently owned by Broward County. Design, permitting, and construction of the Project is intended to take place in phases. The first phase will be the programming phase. The second phase will be the design and preparation of construction documents and permitting phase. The third phase will be the construction of the facility during such a time that construction activities won’t interrupt port operations, including but not limited to, traffic, taxi movement and staging, stores truck staging and movement and other vehicle operation that could potentially impact the port’s ability to service its clients and maritime operations.
X
CPZ Architects worked with the City of Coral Springs to create program projections, evaluate the prospect of public and private partnerships, and develop a multi-facility redevelopment plan for the relocation of the city’s City Hall. CPZ created a questionnaire to review the needs, both present and projected, for each of the city’s departments. Utilizing existing building drawings, we created a diagrammatic plan depicting department office layouts and zoning. The City is still working with this information to determine the feasibility of relocating and redevelopment.
Delray Beach City Hall Assessment Study, Delray Florida
(1) TITLE AND LOCATION (City and State)
Port St. Lucie Needs Assessments, Port St, Lucie , Florida
2009 2009
A complete assessment of 10 acre Port Saint Lucie Public Works Facility was conducted. This includes four buildings encompassing the administration offices, vehicle repair, vehicle canopies, central stores and warehouse space. The City provided all the current and future staffing needs, as well as all equipment. We reviewed the current spaces provide for all activities to development a matrix of staff and space requirements. A complete site survey and environmental assessment was completed. This provided a current and accurate based to develop the redevelopment of the facility. The finish floor elevations of all buildings were recorded and compared to the current flood maps for the County to determine if potential flooding was a concern. All buildings were structurally reviewed for the ability to resist current wind loads. The evaluation resulted in the replacement of the existing buildings so allow them to function after an emergency event.The new site plan considered all of the assessment findings and allowed for the development of a secure, essential facility and an efficient layout fhe complex.
12. NAME 13. ROLE IN THIS CONTRACT
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
14. YEARS EXPERIENCE
b. WITH CURRENT FIRM
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)16. EDUCATION (Degree and Specialization)
15. FIRM NAME AND LOCATION (City and State)
STANDARD FORM 330 (REV. 8/2016) PAGE 2
a.
b.
c.
d.
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
e.
19. RELEVANT PROJECTS
(2) YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
(2) YEAR COMPLETED
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Jayson Hall Senior Project Manager a. TOTAL
19 17
CPZ Architects, Inc.
Florida Atlantic University
Bachelor of Architecture- 5 years
NA
National Council of Architectural Registration, Sunrise Chamber of Commerce
(1) TITLE AND LOCATION (City and State)
2010 2022
CPZ Architects Inc. was retained to provide master planning and harden their Existing Public Works Building for the City of Coral Springs. The existing Public Works Building is a metal building that does not meet current hurricane code. Since this is a public works facility the city needed to keep this facility in operation at all times. The most economical way to keep this facility in operation is to design a new building in another location on the site. Based on the city’s funding and budget the project was designed in phases. Cost: $25 million
2019 2023
(1) TITLE AND LOCATION (City and State)
(1) TITLE AND LOCATION (City and State)
X
(1) TITLE AND LOCATION (City and State)
2008 2010
The main goals of the project were to have a new two-story Administrative Building of approximately 12,500 sq ft designed as an “Essential Facility” and to meet “LEED standards” taking advantage of natural lighting and introducing Solar Energy Systems. This Building contains Labs and a Control Room that overlooks the plant operations and is proposed to be directly connected to the tanks and filtrations systems through overhead walkways/ bridges. The city wanted to redevelop the entire site with new building structures for the Administration offices and several accessory buildings to the Water Treatment plant in a way that its operation is not affected during construction. $35 million.
Tamarac Control Building, City of Tamarac, Florida
Westside Maintenance Facility Master Plan, Coral Springs, Florida
Westside Fire Administration & Fire Rescue , Coral Springs, Florida
(1) TITLE AND LOCATION (City and State)
2019 2023The existing building and proposed building additions will be designed as an essential facility to withstand 210 mph wind loads. This building will serve as an EOC during a hurricane event. The entire building will be on a 100% emergency back-up generator to run the building for 72 hours continuous during a state of emergency. The site has been designed to accommodate fire rescue trucks and semi-trucks. A concrete apron will be designed at exterior ends of the Fire truck repair bays. There are also fire truck parking located at NW corner of the site. Parking is provided for visitors and Fire Administration and Fire Academy at East side (Main entrance) of the building, and parking for Fleet and Central Stores are along the west, north and south side of the building and overflow parking. Reconfiguration of handicapped parking at main entrance.
Highway & Bridge Maintenance Div Admin Building Expansion, Broward County, Fl
Scope to includes design to expand the administrative building by 5,500 sq feet. Phases consist of pre-design- programming and schematic design. Other projects for Broward County Jayson is working on are the Restrooms for West Lake Park, Tree Tops Park, Markham Park and Trade winds Park and playgrounds for Ty park and West Lake Park.
Coral Springs Public Safety Complex, City of Coral Springs, Florida
Comprehensive 3-phase renovation, expansion and hurricane hardening of existing 60,000 SF facility, including new 2-story, 11,000 SF addition for state-of-the-art Emergency Management and Fire Department operations. Project involved complete reconfiguration of the complex’s 7-acre site to expand parking space and provide new site security and emergency generator system. Phase III involved 3 floors of tenant improvements and upgrading the building with new automatic sprinkler and HVAC systems. New facilities also include a 9,800-square foot LEED Certified Gold Fire Station, the only one of its kind in Broward County. $8 million
EXPERIENCE
Ludovic Binner is a senior structural engineer with experience in structural design, wind
frame analysis, calculations, special inspections, and construction administration for
projects in the United States and France. He has worked on a variety of projects
including multi-level hotels and resorts, educational facilities, community centers,
sports arenas, park facilities, performing arts buildings, and marine facilities structures.
Ludovic is experienced has experience as a project manager on both private and public
sector work, leading intensive coordination between engineering disciplines,
consultants, and clients.
REPRESENTATIVE PROJECT EXPERIENCE
City of Coral Springs, Public Safety Building and Fire Station, Coral Springs, FL.
Project structural engineer for design of an expansion of and addition to a three-story
building incorporating structural hardening to comply with emergency operation center
uprated wind design criteria. Responsibilities included structural analysis of the existing
structure combined with hardening system and other alterations; design and
proportioning of gravity and lateral load capacity versus increased demand for
programmed use and hurricane event; designed lightweight composite deck, structural
steel framing, and rooftop superstructures; prepared project specifications and
construction drawings; provided various engineering services during construction,
including response to RFIs, shop drawing review, coordination meetings, repair
sketches, recommendations, and special inspections. Tasks included constructing new
prestressed joists and concrete decks including infill floors, replacing light frame curtain
wall with reinforced masonry, and strengthening structural steel roof framing and
decking.
City of Weston, Emergency Operations Building, Weston, FL. Structural engineer for
the design of a new three-story, 21,600-square-foot municipal building that hosts a
range of public services including building and zoning, code enforcement, fire marshal,
fire code services, information technology, and city personnel offices. Design elements
included reinforced concrete masonry walls, prestressed concrete floor, and roof joists
with concrete floor and roof slabs, including housing chillers and emergency generators.
Broward County, Edgar P. Mills Multi-Purpose Center and Garage, Fort Lauderdale, FL.
Structural engineer for the design of a 50,000-square-foot, three-story facility and
87,500-square-foot, 324-car, three-story parking structure. The building houses
Broward County Social Services Departments, which aids the elderly, families, veterans,
and those most at risk. The project received LEED Silver certification.
Broward County, Central Broward Regional Park, Lauderhill, FL. Structural engineer
for a 5,000-seat, multi-purpose stadium and entertainment complex, aquatic facilities,
and soccer fields with various supporting recreational fields/courts and pavilions.
Responsibilities included design for the bleacher foundation and overhang canopy
structure for the cricket stadium.
Port Everglades Terminal 4 Parking Garage and Pedestrian Bridge, Fort Lauderdale, FL. Senior structural engineer/engineer-of-record for the parking garage and project
manager for design services during construction and special inspections. The project
EDUCATION
MS, Civil Engineering, Ecole
Nationale Supérieure des Arts
et Industries de Strasbourg,
France (INSA – Strasbourg),
2001
AS, Engineering, University
of Paris VII, Paris France,
1997
REGISTRATION
Professional Engineer:
Florida, #72274, 2011
Ludovic Binner, PE
Structural Engineer
Ludovic Binner, PE
Structural Engineer
2
consists of a five-level (providing for two-level addition), 162,240-square-foot post-
tension concrete framed garage. The project also includes a 700-foot elevated steel
framed box-girder truss pedestrian bridge. Two external flyover vehicular ramps
provide express entering and exiting to the garage’s second level. Access to the Port
secured area is provided through a standalone checkpoint structure. The building was
designed to Florida Building Code (FBC) 2017 and was intended to be a ParkSmart
certified building. Direct expansion (DX) variable refrigerant flow (VRF) technology
was selected for the pedestrian bridge building and outdoor air preconditioning for its
compact air handlers with remote condensing units for efficient temperature and
humidity control. Bridge is conditioned with two equal capacity VRF systems, each
serving half of the bridge. Outdoor air is cooled and dehumidified in dedicated outdoor
air units (DOAU). Two DOAU and condensing units are at each end of the bridge.
Preconditioned outdoor air is delivered to each side of the bridge to satisfy the code
ventilation requirements and keep the building positively pressurized. Forced supply
and exhaust ventilation systems were provided for the ground floor ground
transportation area to control vehicular emissions. All exterior equipment has the
necessary product approvals and is fastened/anchored to satisfy FBC, Building High-
Velocity Hurricane Zone Requirements. Building management system (BMS) is
installed to control and monitor heating, ventilation, and air conditioning (HVAC);
lighting; and security systems. The system consists of high-speed peer-to-peer network
off direct digital controllers (DDC) and operator workstation residing and
communicating on a NATIVE BCAnet IP network system. Controls systems are
connected to the County ethernet system. Threshold inspections tools include use of
tablet with construction management web application to access construction
documents and reports.
Nova Southeastern University, Oceanography Research Center, Dania Beach, FL.
Project structural engineer for over-water structure, marina seawall, and docks
replacement. Responsibilities included design and proportioning of prestressed
concrete composite structure; design and proportioning of mildly reinforced and
prestressed seawall panels and pilings; review of design criteria for compliance with
specific requirements for docking and mooring facilities; interdisciplinary project
coordination and preparation of construction drawings; and providing various
engineering services during construction, including response to RFIs, shop drawing
review, coordination meetings, repair sketches, and recommendations and special
inspections. Structural scope included installation of 600 linear feet of new seawall and
construction of 21,000 square feet of over-water structure along the Intracoastal Water
Way, replacement of 1,100 linear feet of marina basin seawall, and bulkhead with
reconfiguration of tie-back system. The entire project included a new four-story
laboratory and classroom building that couples with the marina to create a state-of-the-
art academic facility. The marina includes all berth side utilities, state-of-the-art
information systems integration, and outdoor classroom appointments. There are also
cranes for loading and unloading large specimens or equipment for the larger research
vessels.
City of Weston Community Center, Weston, FL. Structural engineer-of-record for multi-
purpose building housing state-of-the-art performing arts auditorium, flexible meetings
rooms, art spaces, banquets halls, and support offices. Outside features include covered
outdoor stage, drive-through porte cochere, public restrooms, security gate, chillers,
and generator plant.
EXPERIENCE
Lawrence (Larry) DeRose has more than 40 years of marine, structural, and civil
engineering consulting experience in South Florida with an emphasis on port, marine,
structural, land development, and terminal projects, from planning to construction
certification. Larry’s professional background includes all levels of experience in his
areas of specialization, ranging from the most basic to management of complex
projects, and in a broad variety of studies involving the practical applications of
hydrology, hydraulics, fluid mechanics, and structural mechanics. He is experienced in
all aspects of planning and directing studies that involve large- and small-scale site
development for government planning programs, including feasibility, construction,
and development. Larry also has extensive experience in the regulatory aspects of land
use, underground pipeline construction, and practical applications of structural
materials. He is a qualified expert witness and has testified before a number of
government agencies and in court on a broad range of matters related to his
professional specialization. These projects have been conducted throughout the entire
eastern half of the United States, as well as in the West Indies, Virgin Islands, and the
Bahamas.
REPRESENTATIVE PROJECT EXPERIENCE
Coral Springs Public Safety Complex, Coral Springs, FL. Principal-in-charge/structural
engineer for the reconfiguration and structural hardening of an existing 60,000-square-
foot safety complex, located on a 7-acre site, that includes a new LEED-certified fire
station building, police station, two-story addition, and parking area. Services for the
included structural, civil, mechanical, electrical, plumbing, fire protection, and life safety
engineering, as well as energy modeling and commissioning. The new 12,500-square-
foot fire station incorporates recycled materials throughout its build. It is the first
LEED-certified building for the City of Coral Springs and serves as a showcase to
educate residents of all ages about environmental sustainability. This facility includes a
full commercial grade kitchen, dining room, entertainment room, gym, outdoor patio,
and living quarters for the 24-hour station staff. This facility’s four bays include a
decontamination room, cascade oxygen room, medical storage, and other emergency
accommodation services. The addition of a two-story, 13,000-square-foot emergency
management facility and fire department administration offices were designed with the
latest energy-saving technologies and equipment. Scope of work included site
improvements, an 8-inch water line extension, grading, an 8-inch gravity sewer, and a
water management plan implementation to bring the site up to current surface water
management standards and regulations.
City of Weston, Emergency Operation Center, Weston, FL. Principal-in-
charge/structural engineer for the design of a new three-story, 21,000-square-foot
building that will accommodate 40 employees from fire code services, fire marshal,
building and zoning, code enforcement and information technology departments.
Services included structural, civil, mechanical, electrical, plumbing, fire protection, and
life safety engineering. Structural design elements include reinforced concrete masonry
walls, pre-stressed concrete floor and roof joists, concrete floor and roof slabs. Building
systems included plumbing, fire protection systems, HVAC with two air-cooled chillers,
electrical systems, lightning protection system, technology systems (AV, security,
EDUCATION
BE, Engineering, Stevens
Institute of Technology, 1973
REGISTRATION
Professional Engineer:
Florida (20169)
CERTIFICATIONS
State Certified Threshold
Building Inspector
AFFILIATIONS
Member, Fellow, American
Society of Civil Engineering
Member, Post Tensioning
Institute
Lawrence DeRose, PE
Southeast Ports Lead
Lawrence (Larry) DeRose, PE
Southeast Ports Lead
2
telecommunications, closed circuit television system), standby generator and diesel fuel
tank system. Site work includes water and sewer piping connections, storm water,
asphalt paving for parking and driveways, and concrete paving.
City of Boca Raton Public Works Maintenance and Administration Complex, Boca
Raton, FL. 20-acre site for all city operations, including administration for the parks,
public works, and engineering departments. The facility provides outdoor storage and
loading for parks department-related landscape, soil, and hardscape. The complex also
houses the city maintenance garage with the usual appointments for support of the
mechanics. Larry provided Engineering Project Management for all buildings and site
Structural, Electrical, Mechanical, and Fire Protection.
Broward County Edgar P. Mills Multi-Purpose Center, Fort Lauderdale, FL. Principal-
in-charge/structural engineer for design of a three-story 50,000-square-foot facility, a
three-story parking garage that accommodates 324 vehicles, an outdoor covered eating
area and covered walkways. The center houses Broward County social services
departments that provide assistance to the elderly, families, veterans, and those most at
risk, by providing case management, emergency assistance, substance abuse treatment
and counseling, family planning, financial assistance, housing assistance, health care and
dental services clinics, and a dispensing pharmacy operated by the Broward County
Health Department. The building received LEED Silver certification.
Greater Fort Lauderdale/Broward County Convention Center Expansion, Fort
Lauderdale, FL. Provided structural and civil engineering services for the addition of
50,000 square feet of exhibition space with 180-foot elevated steel trusses. To support
convention growth throughout South Florida, the space created more meeting rooms,
larger pre-function space in the grand lobby, new administrative offices, and an
elevated, climate-controlled pedestrian skywalk on the second floor leading to the
parking garage.
Broward County South Regional Library, Pembroke Pines, FL. Principal-in-
charge/structural engineer for the two-story library that serves both the citizens of
Broward County and the students of Broward Community College’s South Campus. It
is the first LEED-certified building in Broward County. The library exterior is of pre-
cast and pre-stressed pigmented concrete tilt wall construction. Its design is aesthetically
unique, and its floor systems are specifically created to accommodate the heavy stacking
loads associated with books and periodicals housed in the library.
Port Everglades Operations Center and Harbormaster Tower, Fort Lauderdale, FL.
Principal-in-charge/structural engineer for the nine-story modern lighthouse-like
building that offers a panoramic 270-degree view of the 2,190-acre stretch of waterways
that make up Port Everglades and its surrounding communities. The operations center,
designed to remain functioning in post-disaster situations, is equipped with the latest
technology in radar and security systems to monitor and operate all the port’s navigable
waters and berthing facilities. It boasts hurricane resistance strength and full stand-by
and backup power.
a.
(1) TITLE AND LOCATION (City and State)
Village of Palm Springs Police Building Due Diligence Report
Palm Springs, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
Current
CONSTRUCTION (If applicable)
N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm
Project Manager + Electrical EOR + Senior Electrical Engineer | Due Diligence Report of Village of Palm Springs Police Department's will
include a site visit to evaluate the condition of existing electrical systems, a report of findings such as general condition, MEP engineer’s
opinion of overall serviceability/longevity as well as recommendation for remedial repair or replacement.
b.
(1) TITLE AND LOCATION (City and State)
Palm Beach Sheriff's Office Headquarters Annex Due Diligence Report
Palm Beach, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2019
CONSTRUCTION (If applicable)
N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm
Project Manager + Electrical EOR + Senior Electrical Engineer | Assessment & Feasibility Report of the existing space includes a site visit
to evaluate the condition of existing electrical systems, a report of findings such as general condition, MEP engineer’s opinion of overall
serviceability/longevity as well as recommendation for remedial repair or replacement and a probable cost estimate.
e.
(1) TITLE AND LOCATION (City and State)
School District of Palm Beach County West Technical Education Center Feasibility Study
Belle Glade, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2019
CONSTRUCTION (If applicable)
2019
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm
Project Manager + Electrical EOR + Senior Electrical Engineer | Assessment & Feasibility Report of the existing space includes a site visit
to evaluate the condition of existing electrical systems, a report of findings such as general condition, MEP engineer’s opinion of overall
serviceability/longevity as well as recommendation for remedial repair or replacement and a probable cost estimate.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME
Sudharma Wijegunawardana, PE, LEED AP, LC
Principal + Division Director West Palm Beach
13. ROLE IN THIS CONTRACT
Project Manager +
Electrical Engineer of Record (EEOR)
14. YEARS EXPERIENCE
a. TOTAL
20
b. WITH CURRENT FIRM
17
15. FIRM NAME AND LOCATION (City and State)
OCI Associates, Inc., West Palm Beach, Florida
16. EDUCATION (Degree and Specialization)
Master of Science, Electrical Engineering, University of South Florida
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
Professional Engineer Florida #63143
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training, Awards, etc.)
Sudharma has served as Project Manager for 20 county and government projects and has led as project manager for 7 site assessments and
feasibility studies for government, public safety and educational facilities. She is currently the project manager for the Village of Palm Springs
Police Building Due Diligence Report and St. Lucie County Library Port Branch Assessment. Sudharma will serve as your Project Manager and
Electrical Engineer of Record for your The City's Space Needs Assessment & Feasibility Studies.
19. RELEVANT PROJECTS
d.
(1) TITLE AND LOCATION (City and State)
Department of Military Affairs West Palm Beach District Court of Appeal Renovation
Palm Beach, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
Current
CONSTRUCTION (If applicable)
Current
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm
Project Manager + Electrical EOR + Senior Electrical Engineer | Due Diligence Report and Assessment evaluation of existing electrical
systems, a report of findings for general condition, MEP engineer’s opinion of overall serviceability/longevity as well as recommendation
for remedial repair or replacement and a probable cost estimate to turn into a Readiness Center for the US National Guard.
c.
(1) TITLE AND LOCATION (City and State)
St. Lucie County Library Port Branch Assessment
Port St. Lucie, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2021
CONSTRUCTION (If applicable)
N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm
Electrical EOR + Senior Electrical Engineer | Our report will pertain to the 6,000 SF existing library building includes evaluation of existing
electrical systems, a report of findings such as general condition, MEP engineer’s opinion of overall serviceability/longevity as well as
recommendation for remedial repair or replacement and a probable cost estimate.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME
Jason Smith, PE, LEED AP BD+C, CEM
Principal + Director of Mechanical Engineering
13. ROLE IN THIS CONTRACT
Mechanical Engineer of Record (MEOR)
14. YEARS EXPERIENCE
a. TOTAL
32
b. WITH CURRENT FIRM
28
15. FIRM NAME AND LOCATION (City and State)
OCI Associates, Inc., Maitland, Florida
16. EDUCATION (Degree and Specialization)
Bachelor of Science, Electrical Engineering, University of Central Florida
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
Professional Engineer Florida #57743
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training, Awards, etc.)
Jason is a Certified Energy Manager and LEED Accredited Professional for Building Design and Construction. He has served as the Mechanical
Engineer of Record (MEOR) on 283+ government projects including The City Halls, Police Departments, County Libraries, and various Public
Safety and Municipal facilities. Jason is currently the MEOR for the Village of Palm Springs Police Building Due Diligence Report and will serve
as the Mechanical Engineer of Record for your City's Space Needs Assessment & Feasibility Studies.
19. RELEVANT PROJECTS
e.
(1) TITLE AND LOCATION (City and State)
Osceola County West Command Center Feasibility Study
Kissimmee, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2019
CONSTRUCTION (If applicable)
N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm
Mechanical EOR | An assessment of the existing mechanical systems to convert an old abandoned Publix into a new $5.5 Million
command center to provide a report of findings such as general condition, MEP engineer’s opinion of overall serviceability/longevity as
well as recommendation for remedial repair or replacement.
a.
(1) TITLE AND LOCATION (City and State)
Village of Palm Springs Police Building Due Diligence Report
Palm Springs, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
Current
CONSTRUCTION (If applicable)
N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm
Mechanical EOR | Due Diligence Report of Village of Palm Springs Police Department's will include a site visit to evaluate the condition
of existing mechanical systems, a report of findings such as general condition, MEP engineer’s opinion of overall serviceability/longevity
as well as recommendation for remedial repair or replacement.
b.
(1) TITLE AND LOCATION (City and State)
Department of Military Affairs West Palm Beach District Court of Appeal Renovation
Palm Beach, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
Current
CONSTRUCTION (If applicable)
Current
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm
Mechanical EOR | Due Diligence Report and Assessment includes evaluation of existing mechanical systems, a report of findings such
as general condition, MEP engineer’s opinion of overall serviceability/longevity as well as recommendation for remedial repair or
replacement and a probable cost estimate to turn into a Readiness Center for the US National Guard.
c.
(1) TITLE AND LOCATION (City and State)
Florida Highway Patrol Orlando International Drive Facility
Orlando, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2020
CONSTRUCTION (If applicable)
N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm
Mechanical EOR | Due Diligence Report and Assessment of the existing building mechanical systems that support an existing two-story
building located at 11059 International Drive, Orlando. Our report will only pertain to existing systems related to building for a possible
purchase by the Florida Highway Patrol.
d.
(1) TITLE AND LOCATION (City and State)
Florida Highway Patrol Troop D Station Facility Assessment
Orlando, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2019
CONSTRUCTION (If applicable)
N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm
Mechanical EOR | With Department of management Services (DMS). Cocoa HQ Building Roof Replacement 10,400 SF Existing building
needs a lightening protection evaluation of existing mechanical systems, a report of findings such as general condition, MEP engineer’s
opinion of overall serviceability/longevity as well as recommendation for remedial repair or replacement.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME
Jason Diehl, PE
Senior Mechanical Engineer
13. ROLE IN THIS CONTRACT
Senior Mechanical Engineer
14. YEARS EXPERIENCE
a. TOTAL
19
b. WITH CURRENT FIRM
11
15. FIRM NAME AND LOCATION (City and State)
OCI Associates, Inc., Maitland, Florida
16. EDUCATION (Degree and Specialization)
Bachelor of Science, Electrical Engineering, University of Central Florida
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
Professional Engineer Florida #57743
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training, Awards, etc.)
Jason's experience includes the design, production, quality control, and coordination of engineering projects for 40+ government and
municipal projects including The City Halls, Courthouses, Police Departments, Fire Stations and other public safety projects. He is currently
working on the Village of Palm Springs Police Building Due Diligence Report and the City of Hollywood Police Headquarters, and will serve as
the Senior Mechanical Engineer for your City's Space Needs Assessment & Feasibility Studies.
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
Village of Palm Springs Police Building Due Diligence Report
Palm Springs, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
Current
CONSTRUCTION (If applicable)
N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm
Senior Mechanical Engineer | Due Diligence Report of Village of Palm Springs Police Department's will include a site visit to evaluate the
condition of existing mechanical systems, a report of findings such as general condition, MEP engineer’s opinion of overall serviceability/
longevity as well as recommendation for remedial repair or replacement.
c.
(1) TITLE AND LOCATION (City and State)
Florida Highway Patrol Orlando International Drive Facility
Orlando, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2019
CONSTRUCTION (If applicable)
N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm
Project Manager + Senior Mechanical Engineer | Due Diligence Report and Assessment of the existing building mechanical systems that
support an existing two-story building located at 11059 International Drive, Orlando. Our report will only pertain to existing systems
related to building for a possible purchase by the Florida Highway Patrol.
d.
(1) TITLE AND LOCATION (City and State)
Florida Highway Patrol Troop D Station Facility Assessment
Orlando, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2019
CONSTRUCTION (If applicable)
N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm
Project Manager + Senior Mechanical Engineer | With Department of management Services (DMS). Cocoa HQ Building Roof Replacement
10,400 SF Existing building needs a lightening protection evaluation of existing mechanical systems, a report of findings such as general
condition, MEP engineer’s opinion of overall serviceability/longevity as well as recommendation for remedial repair or replacement.
b.
(1) TITLE AND LOCATION (City and State)
Department of Military Affairs West Palm Beach District Court of Appeal Renovation
Palm Beach, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
Current
CONSTRUCTION (If applicable)
Current
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm
Senior Mechanical Engineer | Due Diligence Report and Assessment includes evaluation of existing electrical systems, a report of findings
such as general condition, MEP engineer’s opinion of overall serviceability/longevity as well as recommendation for remedial repair or
replacement and a probable cost estimate to turn into a Readiness Center for the US National Guard.
e.
(1) TITLE AND LOCATION (City and State)
City of Hollywood Police Headquarters
Hollywood, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
Current
CONSTRUCTION (If applicable)
Est. 2024
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm
Senior Mechanical Engineer | 4-Story facility includes all functions including training and gun range, property and evidence, quartermaster,
patrol, holding cells, detective units, recruitment, administration and public information; includes a 110,000 SF parking structure to
support 350 vehicles.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME
Kaz Kazeminia, NICET
Principal + Director of Plumbing & Fire Protection
13. ROLE IN THIS CONTRACT
Director of Plumbing & Fire Protection
14. YEARS EXPERIENCE
a. TOTAL
24
b. WITH CURRENT FIRM
24
15. FIRM NAME AND LOCATION (City and State)
OCI Associates, Inc., Maitland, Florida
16. EDUCATION (Degree and Specialization)
American University, Washington DC
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
NICET
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training, Awards, etc.)
Kaz has over 24 years of experience in the design of Plumbing and Automatic Fire Sprinkler systems for government facilties. He has been
involved in over 150 designs for government projects including The City Halls, Police Departments, County Libraries, and various Public Safety
and Municipal facilities. Kaz is currently working on the St. Lucie County Library Port Branch Assessment and the Village of Palm Springs Police
Due Diligence Report and will serve as the Director of Plumbing & Fire Protection for your City's Space Needs Assessment & Feasibility Studies.
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
Village of Palm Springs Police Building Due Diligence Report
Palm Springs, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
Current
CONSTRUCTION (If applicable)
N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm
Director of Plumbing & Fire Protection | Due Diligence Report of Village of Palm Springs Police Department's will include a site visit to
evaluate the condition of existing plumbing & fire protection systems, a report of findings such as general condition, MEP engineer’s
opinion of overall serviceability/longevity as well as recommendation for remedial repair or replacement.
c.
(1) TITLE AND LOCATION (City and State)
San Francisco International Airport GBAS Feasibility Study
San Francisco, California
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2018
CONSTRUCTION (If applicable)
N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm
Director of Plumbing & Fire Protection | GBAS Feasibility Study to evaluate the condition of existing plumbing & fire protection systems,
a report of findings such as general condition, MEP engineer’s opinion of overall serviceability/longevity as well as recommendation for
remedial repair or replacement and a probable cost estimate.
d.
(1) TITLE AND LOCATION (City and State)
United States GSA Chambers Courthouse Study
San Francisco, California
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2017
CONSTRUCTION (If applicable)
N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm
Director of Plumbing & Fire Protection | Courthouse Feasibility Study includes a site visit to evaluate the condition of existing plumbing &
fire protection systems, a report of findings such as general condition, MEP engineer’s opinion of overall serviceability/longevity as well
as recommendation for remedial repair or replacement and a probable cost estimate
e.
(1) TITLE AND LOCATION (City and State)
San Francisco International Airport Superbay Study
San Francisco, California
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2015
CONSTRUCTION (If applicable)
N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm
Director of Plumbing & Fire Protection | Superbay Hangar Door Brake Feasibility Study to evaluate the condition of existing plumbing &
fire protection systems, a report of findings such as general condition, MEP engineer’s opinion of overall serviceability/longevity as well
as recommendation for remedial repair or replacement and a probable cost estimate.
b.
(1) TITLE AND LOCATION (City and State)
Department of Military Affairs West Palm Beach District Court of Appeal Renovation
Palm Beach, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
Current
CONSTRUCTION (If applicable)
Current
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm
Director of Plumbing & Fire Protection | Due Diligence Report and Assessment includes evaluation of existing electrical systems, a report
of findings such as general condition, MEP engineer’s opinion of overall serviceability/longevity as well as recommendation for remedial
repair or replacement and a probable cost estimate to turn into a Readiness Center for the US National Guard.
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME
Art Munns, CxA
Director of Building Commissioning
13. ROLE IN THIS CONTRACT
Director of Building Commissioning
14. YEARS EXPERIENCE
a. TOTAL
36
b. WITH CURRENT FIRM
9
15. FIRM NAME AND LOCATION (City and State)
OCI Associates, Inc., Maitland, Florida
16. EDUCATION (Degree and Specialization)
Mechanical Design and Assembly, Massanutten Technical Center, Harrisonburg, VA
17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
CxA #514-1170
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training, Awards, etc.)
Art has over 35 years of experience in mechanical engineering production, project management, energy modeling, and building commissioning
(LEED fundamental & LEED enhanced). He has recently completed assessments and studies for government projects including Okeechobee
Sheriff's Office Assessment and Okeechobee Co Health Department HVAC Feasibility Report and will serve as the Director of Building
Commissioning for your City's Space Needs Assessment & Feasibility Studies.
19. RELEVANT PROJECTS
b.
(1) TITLE AND LOCATION (City and State)
Okeechobee Sheriff's Office Jail Assessment & Report
Okeechobee, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2020
CONSTRUCTION (If applicable)
N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm
Project Engineer - Mechanical | Site visit and assessment of the existing systems at the existing 112,000 SF jail in preparation of a
renovation and expansion to the facility provide a report of our findings such as general condition, MEP engineer’s opinion of overall
serviceability/longevity as well as recommendation for remedial repair or replacement of the existing systems.
a.
(1) TITLE AND LOCATION (City and State)
Osceola County West Command Center Feasibility Study
Kissimmee, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2019
CONSTRUCTION (If applicable)
N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm
Project Manager + Director of Building Commissioning | An assessment of the existing MEP/FP systems to convert an old abandoned
Publix into a new $5.5 Million command center for Osceola County. Our scope required a site visit to evaluate the condition of the
existing systems to convert the 26,000 SF space into a new Command Center to support the West side of the county.
c.
(1) TITLE AND LOCATION (City and State)
Okeechobee Co Health Department HVAC Feasibility Report
Okeechobee, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2020
CONSTRUCTION (If applicable)
N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm
Project Engineer - Mechanical | Site visit and reports of the existing systems to include recommendations for remedial repairs including
but not limited to replacement of units and conditioning mechanical spaces in attics or replace all units with an air-cooled chiller with
AHU’s and VAV system.
d.
(1) TITLE AND LOCATION (City and State)
The City of Jupiter The City Hall Cx
Jupiter, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
Current
CONSTRUCTION (If applicable)
N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm
Project Manager + Director of Building Commissioning | OCI’s Cx team will provide “Fundamental” Building Commissioning services
in accordance with guidelines as outlined by AABC Commissioning Group. OCI is designing the MEP/FP/ITS/AV/Cx engineering to the
41,500-square-feet The City Hall.
e.
(1) TITLE AND LOCATION (City and State)
City of Hollywood Police Headquarters Cx
Hollywood, Florida
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
Current
CONSTRUCTION (If applicable)
Est. 2024
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE R Check if project performed with current firm
Project Manager + Director of Building Commissioning | 4-Story facility includes all functions including training and gun range, property
and evidence, quartermaster, patrol, holding cells, detective units, recruitment, administration and public information; includes a
110,000 SF parking structure to support 350 vehicles.
AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (1/2004) PAGE 1
j E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
(Complete one Section E for each key person.)
12. NAME Dan Jeffreys 13. ROLE IN THIS CONTRACT
Senior Cost Estimator
14. YEARS EXPERIENCE
a. TOTAL 35 b. WITH CURRENT FIRM 16
15. FIRM NAME AND LOCATION (City and State) CMS-Construction Management Services, Inc. – Deerfield Beach, FL 33441
16. EDUCATION (DEGREE AND SPECIALIZATION)
University of North Florida – Construction Management
University of Florida – Architecture Program
17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
N/A
18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
N/A
19. RELEVANT PROJECTS
a.
(1) TITLE AND LOCATION (City and State)
City of Sunrise – Sunrise Senior Center Renovation and Addition
Sunrise, FL
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2015
CONSTRUCTION (If applicable)
N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Description: Renovation and Addition to Center which includes parking lot expansion, a new exercise room, a new craft
room, a new media room, renovated kitchen area with new equipment, and a garden area that has a room with glass-
paneled walls, featuring living walls, or vertical gardens, waist-high plants, and a computer room and exercise room.
Size: Building Addition Size = 2,200 SF
Cost: $2,584,490.00
Scope of Work: Schematic Design / Design Development / Construction Documents Cost Estimating
b.
(1) TITLE AND LOCATION (City and State)
Sunrise Public Safety Building - Community Meeting Room Addition
& Site Improvements
Sunrise, FL
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2015
CONSTRUCTION (If applicable)
N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Description: New Meeting Room addition and site improvements (new pump room, painting canopy, refurbish fountain)
Size: Meeting Room = 865 SF; Site Improvements = 5,000 SF
Cost: $863,594.00
Scope of Work: Design Development / Construction Documents Cost Estimating
c.
(1) TITLE AND LOCATION (City and State)
City of Miami Beach – Police Headquarters – Visitors Parking Garage
Miami Beach, FL
(2) YEAR COMPLETED
PROFESSIONAL SERVICES 2016 CONSTRUCTION (If applicable) N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Description: New Addition to existing Parking Garage
Size: Project Site Size = 46,415.00 SF (New Added Area)
Cost: $11,320,752.00
Scope of Work: Order of Magnitudes Cost Estimating
d.
(1) TITLE AND LOCATION (City and State) Miami-Dade County Internal Services Department ‒ Mental Health
Facility Renovation
Miami, FL
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2017
CONSTRUCTION (If applicable)
N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Description: Buiildout/Rehabilitation/Renovation of existing 7-story facility for defendants too mentally unstable to stand
trial on criminal charges
Size: Project Site Size = 214,382 SF; Building = 181,324 SF
Cost: $39,184,118.00
Scope of Work: Schematic Design / Design Development / Construction Document Cost Estimating
Continued…
AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (1/2004) PAGE 2
e.
(1) TITLE AND LOCATION (City and State)
Apotex Florida Expansion – Phases A, B and C
Miramar, FL
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2018
CONSTRUCTION (If applicable)
N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Description: Interior buildout; addition of an entire floor to the existing building
Size: Project Site Size = 165,400 SF
Cost: $24,999,989.00
Scope of Work: Construction Documents Cost Estimating
f.
(1) TITLE AND LOCATION (City and State)
City of Lake Worth – Beach Complex Casino Building
Lake Worth, FL
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2018 CONSTRUCTION (If applicable) N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Description: Renovation of existing oceanfront municipal park including casino building, new service area, new
swimming pool, new drop-off area, new stage area, new maintenance facility, parking lots/parking garage, new stair
elevator tower
Size: 13 Acres
Cost: Five different schemes ranging from $18,161,285.00 to $59,015,031.00
Specific Role: Order of Magnitude Cost Estimating
g.
(1) TITLE AND LOCATION (City and State)
City of Coral Springs – Westside Maintenance Facility
Coral Springs, FL
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2020
CONSTRUCTION (If applicable)
N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Addition of a second story to the existing one-story, 50,026 SF Vehicle Maintenance Facility with Central
Storages/Offices and Parking Lot; includes sitework, utilities, lighting, and landscaping
Size: Phase 1 – Central Stores/Offices = 17,741 SF; Phase 2 – Maintenance Facility Addition = 26,000 SF; Parking Lot =
27,345 SF)
Cost: $28,471,800.00
Scope of Work: Order of Magnitude / Construction Documents Cost Estimating
h.
(1) TITLE AND LOCATION (City and State) Broward County – West Regional Courthouse (Phase II) – Clerk of
Courts, Civil & Marriage
Plantation, FL
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2020 CONSTRUCTION (If applicable) N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
Description: Interior renovation (buildout) of existing space which includes demolition and installation of new floors,
ceilings, ballistic-resistant windows, painting, replacing of furniture, doors, carpeting, fire extinguishers, HVAC, and
adjusting Mechanical / Electrical / Plumbing to reflect the new layout of space
Size: 11,600 SF
Cost: $1,686,039.00
Specific Role: Construction Cost Estimating
I.
(1) TITLE AND LOCATION (City and State)
Miami-Dade College – Eduardo J. Padrón Campus Plaza (Building
6000, Remodeling of Vacant Floors 11, 12, 14 & 15) for Classrooms
and Administrative Offices (Phases II & III)
Miami, FL
(2) YEAR COMPLETED
PROFESSIONAL SERVICES
2020
CONSTRUCTION (If applicable)
N/A
(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm Description: Buildout/Remodel of Floors 11, 12, 14 & 15 for future classrooms with administrative offices on 11th floor
Size: Each floor = 11,260 SF
Cost: $9,271,693.00 (Floor #11 = $2,251,397.00; Floor #12 = $2,214,058.00; Floor #14 = $2,273,960; Floor #15 =
$2,532,279.00)
Scope of Work: Conceptual Schematic / Design Development / Construction Documents Cost Estimating
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO
THIS CONTRACT (Include scope, size, and cost)
25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1)FIRM NAME
CPZ Architects, Inc
(2)FIRM LOCATION (City and State)
Plantation, Florida
(3)ROLE
Architect
b.
(1)FIRM NAME
MUEngineers, Inc..
(2)FIRM LOCATION (City and State)(3)ROLE
Structural Engineer
c.
(1)FIRM NAME
Keith Team
(2)FIRM LOCATION (City and State)
Pompano Beach, Florida
(3)ROLE
Civil, Landscape & Survey
d.
(1)FIRM NAME (2)FIRM LOCATION (City and State)
Fort Lauderdale, Florida
(3)ROLE
Geotechnical
e.
(1)FIRM NAME
CMS
(2)FIRM LOCATION (City and State)
Deerfield Beach, Florida
(3)ROLE
Cost Estimator
The Port Everglades Department of Broward County intends to construct a new facility to consolidate Port Facilities Maintenance and
Operations from the current functions that are located within various buildings throughout the Port Everglades campus into a central
location. This Project is intended to locate this new facility within the physical boundary of Port Everglades on property currently
owned by Broward County. Design, permitting, and construction of the Project is intended to take place in phases. The first phase
will be the programming phase. The second phase will be the design and preparation of construction documents and permitting
phase. The third phase will be the construction of the facility during such a time that construction activities won’t interrupt port
operations, including but not limited to, traffic, taxi movement and staging, stores truck staging and movement and other vehicle
operation that could potentially impact the port’s ability to service its clients and maritime operations.
Consultant shall prepare and provide a programming and recommendations report as a standalone document. This document shall
define and outline the facility’s needs as a part of design services and shall be used to determine the size of the facility, number of rooms,
spaces, uses and operational adjacencies, employee and port/county vehicle parking, specialized equipment parking and storage,
including, but not limited to, listing and compiling all equipment anticipated and needed to operate the facility in an efficient and
effective way. The location of the facility will also be reviewed and recommended after evaluation of the various available sites
throughout the Port campus.
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY
NUMBER 1
a. PROJECT OWNER
21. TITLE AND LOCATION (City and State)
b. POINT OF CONTACT NAME
23.PROJECT OWNER'S INFORMATION
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Broward County
2019 2023
John Foglesong, P.E., Dir. Seaport En. & Const.
c. POINT OF CONTACT TELEPHONE NUMBER
Broward County Consulting Services for Consolidated Facilities
Maintenance Building
954-468-0142
Terracon
Oakland Park, Florida
$35 Million
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)
a. PROJECT OWNER
21. TITLE AND LOCATION (City and State)
25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
20. EXAMPLE PROJECT KEY
NUMBER
a.
b.
c.
d.
e.
f.
(1) FIRM NAME (2) FIRM LOCATION (City and State)
(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State)
(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State)
(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State)
(3) ROLE
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
b. POINT OF CONTACT NAME
23. PROJECT OWNER'S INFORMATION
(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State)
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
CPZ Architects was retained to renovate an existing building for their new vehicle maintenance building for the City of Coral Springs. The renovation of the existing vehicle maintenance building includes the following: Demolition of existing Westside Vehicle Maintenance Building (Metal Building). This site is planned for a future parking garage equipped with a car wash. (4150 NW 120th Avenue) The proposed building will be designed to serve as the new Westside Vehicle Maintenance Facility. The proposed 72,394 SF building will be designed to house Fire Administration, Fleet, Central Stores, City Clerk Storage, and HR Storage.• Fleet: The proposed new 30,552 SF, 2-story Fleet area includes offices forfuture Fleet employees, restrooms, reception area, lobby, storage rooms,conference room, copy rooms, and break room. This area also includes a garagearea and is equipped with (8) car bays, small engine repair bay, (3) Fire TruckBays, EMS Truck Bay, Motorcycle Bay, Alignment Bay, parts storage, offices,media rooms, break room, storage rooms, and locker rooms. The primaryfunction of this portion of the building is for Fleet vehicle repair garage andFleet Administration.
c. POINT OF CONTACT TELEPHONE NUMBER
2
Coral Springs Westside Maintenance Facility Master Plan
City of Coral Springs John Norris, Director of Public Works
2018 2022
CPZ Architects Architect
MUEngineers, Inc.Structural Engineer
Delta G Engineering MEP
CMS-Construction
Management Services, Inc.Cost Estimator
Terracon Consulting Fort Lauderdale, FL Geotechnical Engineer
Plantation, FL
Oakland Park, FL
Fort Lauderdale, FL
Deerfield Beach, FL
g
(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State)
Chen Moore Fort Lauderdale, Fl Civil, Landscape
Stoner & Associates Davie, Fl Survey
ED+A Stuart, FL Acousticsh.
(1) FIRM NAME
954-344-1166
(2) FIRM LOCATION (City and State)(3) ROLE
• Central Stores: The proposed new 9,277 SF, 2-story Central Stores area includes open office area for future Central Stores employees,restroom, conference room, Fleet Pick-up Counter, EMS Storage, mezzanine storage, warehouse storage, and loading docks. The primaryfunction of this portion of the building is for the city’s Central Stores.
The existing building and proposed building additions will be designed as an essential facility to withstand 210 mph wind loads. This building will serve as an EOC during a hurricane event. The entire building will be on a 100% emergency back-up generator to run the building for 72 hours continuous during a state of emergency.
The site has been designed to accommodate fire rescue trucks and semi-trucks. A concrete apron will be designed at exterior ends of the Fire truck repair bays. There are also fire truck parking located at NW corner of the site. Parking is provided for visitors and fire administration at East side (Main entrance) of the building, and parking for Fleet and Central Stores are along the west, north and south side of the building and overflow parking. Reconfiguration of handicapped parking at main entrance. A new flag pole area with brick pavers will be added to the building’s main entrance area. The site drainage will be redesigned around the entire site.
$20 Million
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)
a. PROJECT OWNER
21. TITLE AND LOCATION (City and State)
25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
20. EXAMPLE PROJECT KEY
NUMBER
a.
b.
c.
d.
e.
f.
(1) FIRM NAME (2) FIRM LOCATION (City and State)
(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State)
(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State)
(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State)
(3) ROLE
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
b. POINT OF CONTACT NAME
23. PROJECT OWNER'S INFORMATION
(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State)
22.YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
CPZ Architects was retained to renovate an existing building for their new Fire Administration and Fire Academy Building for the City of Coral Springs. The renovation of the existing building includes the following:1.Demolition of existing Vehicle Maintenance Building (Building). This site is for a future parking garage equipped with a car wash.2.(4150 NW 120th Avenue) The approximate 72,394 SF building will be designed to house Fire Administration, Fire Academy, FireTraining, Fleet, Central Stores, City Clerk Storage, and HR Storage. See spatial layout below for the Fire Administration and FireAcademy.
c. POINT OF CONTACT TELEPHONE NUMBER
3
Coral Springs Westside Fire Administration and Fire Academy Building
City of Coral Springs John Barry, Deputy Chief
2018 2022
CPZ Architects Architect
MUEngineers, Inc.Structural Engineer
Delta G Engineering MEP
CMS-Construction
Management Services, Inc.Cost Estimator
Terracon Consulting Fort Lauderdale, FL Geotechnical Engineer
Plantation, FL
Oakland Park, FL
Fort Lauderdale, FL
Deerfield Beach, FL
g
(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State)
Chen Moore Fort Lauderdale, Fl Civil, Landscape
Stoneer & Associates Davie, Fl Survey
ED+A Stuart, FL Acousticsh.
(1) FIRM NAME
954-612-7638
(2) FIRM LOCATION (City and State)(3) ROLE
$25 Million
The existing building and proposed building additions will be designed as an essential facility to withstand 210 mph wind loads. This building will serve as an EOC during a hurricane event. The entire building will be on a 100% emergency back-up generator to run the building for 72 hours continuous during a state of emergency.
The site has been designed to accommodate fire rescue trucks and semi-trucks. A concrete apron will be designed at exterior ends of the Fire truck repair bays. There are also fire truck parking located at NW corner of the site. Parking is provided for visitors and Fire Administration and Fire Academy at East side (Main entrance) of the building, and parking for Fleet and Central Stores are along the west, north and south side of the building and overflow parking. Reconfiguration of handicapped parking at main entrance. A new flagpole area with brick pavers will be added to the building’s main entrance area. The site drainage will be redesigned around the entire site.
20. EXAMPLE PROJECT KEY
NUMBER
4
21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED
PROFESSIONAL SERVICES
2018
CONSTRUCTION (if Applicable)
2019
23. PROJECT OWNER’S INFORMATION
a.PROJECT OWNER
City of Delray Beach
b.POINT OF CONTACT NAME
Dan Tintner
c. POINT OF CONTACT TELEPHONE NUMBER
954-972-3959 ext. 150
24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1)FIRM NAME
CPC South Florida.
(2)FIRM LOCATION (City and State)
Deerfield Beach, Florida
(3)ROLE
Engineer
b.
(1)FIRM NAME
CPZ Architects, Inc.
(2)FIRM LOCATION (City and State)
Plantation, Florida
(3)ROLE
Architect
c.
(1)FIRM NAME
MUEngineers, Inc.
(2)FIRM LOCATION (City and State)
Oakland Park, Florida
(3)ROLE
Structural Engineer
The Delray Beach City Hall and Community Center Needs Assessment is a study project, in conjunction with Carnahan,
Proctor and Cross. We are the space study entity of the project where CPC will provide the Survey of the existing
facility. We are directed to define the current use of the facility then determine the future needs of the Complex as it
stands today or the potential of consolidating the current users and additional users into a City Center concept. New 365
Car Garage.
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACTQU(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)
Delray Beach City Hall Assessment Study
Delray Beach, Florida
20. EXAMPLE PROJECT KEY
NUMBER
21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED
PROFESSIONAL SERVICES
2018
CONSTRUCTION (if Applicable)
2019
23. PROJECT OWNER’S INFORMATION
a.PROJECT OWNER
City of Delray Beach
b.POINT OF CONTACT NAME
Dan Tintner
c. POINT OF CONTACT TELEPHONE NUMBER
954-972-3959 ext. 150
24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUQUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)
Delray Beach Police Department Assessment Study
Delray Beach, Florida
20. EXAMPLE PROJECT KEY
NUMBER
5
21. TITLE AND LOCATION (City and State) 22. YEAR COMPLETED
PROFESSIONAL SERVICES
2018
CONSTRUCTION (if Applicable)
2019
23. PROJECT OWNER’S INFORMATION
a.PROJECT OWNER
City of Delray Beach
b.POINT OF CONTACT NAME
Dan Tintner
c. POINT OF CONTACT TELEPHONE NUMBER
954-972-3959 ext. 150
24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUQUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)
Delray Beach Police Department Assessment Study
Delray Beach, Florida
The City of Delray Beach Police Department hired CPZ to complete a needs and assessment study of their existing Police Department Facilities to determine if the existing building could be renovated or based on the results of the assessment report build a new Police Facility. CPZ Architects has completed a needs basement of the Delray Beach Police Station outlining their current needs and providing an estimate of the future space needs for the next 10 years. A conceptual master plan was developed for two possible solutions to their space needs along with budgetary estimates. Option 1 included using the existing facility and expanding around the facility along with construction of parking garage. The second option was to construct a completely new multi-story facility on the back part of the site, while maintaining operation in the existing facility. Upon competition of the new facility, demolish the existing facility and construct the new parking garage. CPZ Architects has now been retained to provide a needs assessment for the City Hall and Community Center Site.
a.
(1)FIRM NAME
CPC South Florida.
(2)FIRM LOCATION (City and State)
Deerfield Beach, Florida
(3)ROLE
Engineer
b.
(1)FIRM NAME
CPZ Architects, Inc.
(2)FIRM LOCATION (City and State)
Plantation, Florida
(3)ROLE
Architect
c.
(1)FIRM NAME
MUEngineers, Inc.
(2)FIRM LOCATION (City and State)
Oakland Park, Florida
(3)ROLE
Structural Engineer
20. EXAMPLE PROJECT KEY
NUMBER
22. YEAR COMPLETED
CONSTRUCTION (if Applicable)
23. PROJECT OWNER’S INFORMATION
a.PROJECT OWNER b.POINT OF CONTACT NAME
24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUQUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY
NUMBER
6
22. YEAR COMPLETED
CONSTRUCTION (if Applicable)
2009
23. PROJECT OWNER’S INFORMATION
a.PROJECT OWNER
City of Coral Springs
b.POINT OF CONTACT NAME
Larry Staneart
24.BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUQUALIFICATIONS FOR THIS CONTRACT(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)
21. TITLE AND LOCATION (City and State)
CPZ Architects worked with the City of Coral Springs to create program projections, evaluate the prospect of public
and private partnerships, and develop a multi-facility redevelopment plan for the relocation of the city’s City Hall.
CPZ created a questionnaire to review the needs, both present and projected, for each of the city’s departments.
Utilizing existing building drawings, we created a diagrammatic plan depicting department office layouts and
zoning. The City is still working with this information to determine the feasibility of relocating and redevelopment.
a.
(1)FIRM NAME (3)ROLE
CPZ Architects, Inc.
(2)FIRM LOCATION (City and State)
Plantation, Florida Architect
City of Coral Springs City Hall Programming
Coral Springs
Professional Services 2009
b.b. PPOOIINT NT OF CONTACT PHONE NUMBER
954-3444-1014
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a. (1)FIRM NAME
CPZ Architects, Inc.
(2)FIRM LOCATION (City and State)
Plantation, Florida
(3)ROLE
Architect
b. (1)FIRM NAME
ML Engineering, Inc.
(2)FIRM LOCATION (City and State)
Vera Beach, Florida
(3)ROLE
Structural Engineer
c. (1)FIRM NAME
Kamm Consulting, Inc.
(2)FIRM LOCATION (City and State)
Fort Pierce, Florida
(3)ROLE
MEP Engineer
d. (1)FIRM NAME
Bowman Consultants
(2)FIRM LOCATION (City and State)
Martin County, Florida
(3)ROLE
Civil Engineers
e. (1)FIRM NAMETerracon Engineers (2)FIRM LOCATION (City and State)Fort Lauderdale, Florida
(3)ROLE
Geo Technical
f. (1)FIRM NAME
WGI Engineering
(2)FIRM LOCATION (City and State)Fort Lauderdale, Florida
(3)ROLE
Landscape Architecture
g. (1)FIRM NAME
Fuller-Armfield-Wagner
(2)FIRM LOCATION (City and State)(3)ROLE
Real Estate Analysis
F.EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)
a. PROJECT OWNER
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
20. EXAMPLE PROJECT KEY
NUMBER
b. POINT OF CONTACT NAME
23. PROJECT OWNER'S INFORMATION
c. POINT OF CONTACT TELEPHONE NUMBER
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
7
A complete assessment of 10 acre Port Saint Lucie Public Works Facility was conducted. This includes four buildings encompassing the administration offices, vehicle repair, vehicle canopies, central stores and warehouse space. The City provided all the current and future staffing needs, as well as all equipment. We reviewed the current spaces provide for all activities to development a matrix of staff and space requirements.
A complete site survey and environmental assessment was completed. This provided a current and accurate based to develop the redevelopment of the facility. The finish floor elevations of all buildings were recorded and compared to the current flood maps for the County to determine if potential flooding was a concern. All buildings were structurally reviewed for the ability to resist current wind loads. The evaluation resulted in the replacement of the existing buildings so allow them to function after an emergency event.
The new site plan considered all of the assessment findings and allowed for the development of a secure, essential facility and an efficient layout for the complex.
21.TITLE AND LOCATION (City and State)Port St. Lucie Needs Assessment Facility
Port St. Lucie, Florida 2020 2021
Port St. Lucie Roger Jacob 772-334-4220
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)
a. PROJECT OWNER
21. TITLE AND LOCATION (City and State)
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
20. EXAMPLE PROJECT KEY
NUMBER
a.
b.
c.
d.
e.
f.
(1) FIRM NAME (2) FIRM LOCATION (City and State)
(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State)
(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State)
(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State)
STANDARD FORM 330 (REV. 8/2016) PAGE 3
(3) ROLE
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
b. POINT OF CONTACT NAME
23. PROJECT OWNER'S INFORMATION
c. POINT OF CONTACT TELEPHONE NUMBER
(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State)
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)Tamarac Water Treatment Building
City of Tamarac
The main goals of the project were to have a new two-story Administrative Building of approximately 12,500 sq ft designed as an “Essential Facility” and to meet “LEED standards” taking advantage of natural lighting and introducing Solar Energy Systems. This Building contains Labs and a Control Room that overlooks the plant operations and is proposed to be directly connected to the tanks and filtrations systems through overhead walkways/ bridges. In addition to the main Administrative building CPZ will assist Engineering consultants in designing the exteriors for new Motor Control, Fluoride and NaOCL Buildings on the site. The city wanted to redevelop the entire site with new building structures for the Administration offices and several accessory buildings to the Water Treatment plant in a way that its operation is not affected during construction. Therefore the project is designed to be built in two phases: 1.The new building will be built on a location that does not require the demolition of the existing infrastructure in Phase 1. 2.The Existing Building will be demolished and Site work will begin as all operations transfer to new Admin Building. The location of the project in proximity to residential neighborhoods of the City of Tamarac gives and excellent opportunity for the project to be designed as a City Landmark that incorporates the building elements of the City’s existing architecture.
8
2019 2022
Ron Stein 954-597-3716
CPZ Architects Plantation, Florida Architect
Eckler Engineering Water Treatment, Water Distribution
WGI Structural, MEP, Civil LandscapeArchitecture
Terracon Consulting Fort Lauderdale, Florida Geotechnical
Avirom & Associates Boca Raton, Florida Survey
CMS Deerfield Beach, Florida Cost
Coral Springs, Florida
West Pallm Beach, Florida
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)
a. PROJECT OWNER
21. TITLE AND LOCATION (City and State)
25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
20. EXAMPLE PROJECT KEY
NUMBER
a.
b.
c.
d.
e.
f.
(1) FIRM NAME (2) FIRM LOCATION (City and State)
(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State)
(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State)
(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State)
(3) ROLE
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
b. POINT OF CONTACT NAME
23. PROJECT OWNER'S INFORMATION
(3) ROLE(1) FIRM NAME (2) FIRM LOCATION (City and State)
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
CPZ Architects was retained by Broward County under a continuing contract to provide programming and schematic design services. CPZ provided a detailed programming report that included a questionnaire for the building users and with the questionnaire produced a needs assessment chart. CPZ then provided a spatial interactionary block diagram of the building users which led into schematic design. Once a floor plan option was selected by the County, CPZ provided an opinion of cost. The opinion of cost exceeded the CCA guideline limit and the County had to put the project on hold.
c. POINT OF CONTACT TELEPHONE NUMBER (954) 357-6460
9
Highway & Bridge Maintenance Div Admin Building Expansion
Broward County, Fl
Broward County Ahmad Ali
2016 2019
CPZ Architects Architect
MUEngineers, Inc.Structural Engineer
Osborn Engineering MEP
CMS Cost Estimator
Plantation, FL
Oakland Park, FL
Fort Lauderdale, FL
Deerfield Beach, FL
(3) ROLE(2) FIRM LOCATION (City and State)
Chen Moore Fort Lauderdale, Fl Civil, Landscape
Design Management Services Fort Lauderdale, Fl LEED
g (1) FIRM NAME
Terracon Consultants, I GeotechnicalFort Lauderdale, FL
$2.5 Million
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'SQUALIFICATIONS FOR THIS CONTRACT (Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)
a. PROJECT OWNER
21. TITLE AND LOCATION (City and State)
25.FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
20. EXAMPLE PROJECT KEY
NUMBER
a.
(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
b. POINT OF CONTACT NAME
23. PROJECT OWNER'S INFORMATION
22. YEAR COMPLETED
PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
Since 2013, CPZ completed space plans for the computer company for the second floor of Building 1415 at Crown Center in Fort Lauderdale. These 34,000 square feet of space was laid out to divide meet the tenant’s needs of more space and departmental divisions. The potential tenant was looking to bring together into one space all of their departments thus reinforcing the corporate identity. The new space needs to accommodate the current staffing as well as anticipated growth for the next two fiscal years. The resulting plan created a central focal element to house the operations and tech squad centers with the other departments encircling this area. Each department has easy access to this central core as well as private conference rooms. Collaboration/relaxation areas are positioned along the edges of departments to encourage team building. Additionally, the plan allows for expansion as the business grows.
c. POINT OF CONTACT TELEPHONE NUMBER (954)771-6714
10
Prolexic Space Plans, Fort Lauderdale, Florida
Crown Center Jim Goldstein
2013 2013
CPZ Architects ArchitectPlantation, FL
$2.5 Million
TITLE OF EXAMPLE PROJECT (From Section F)
G. KEY PERSONNEL PARTICIPATION IN EXAMPLE PROJECTS
1
2
3
4
5
6
7
8
9
10
STANDARD FORM 330 (REV. 8/2016) PAGE 4
26. NAMES OF KEY
PERSONNEL
(From Section E, Block 12)
27. ROLE IN THIS
CONTRACT
(From Section E, Block 13)1 2 3 4 5 6 7 8 9 10
29.EXAMPLE PROJECTS KEY
NUMBER TITLE OF EXAMPLE PROJECT (From Section F)NUMBER
28. EXAMPLE PROJECTS LISTED IN SECTION F
(Fill in "Example Projects Key" section below before completing table.
Place "X" under project key number for participation in same or similar role.)
Chris Zimmerman, AIA President
Jayson Hall Senior Project Manager
Larry DeRose, PE Senior Structural Engineer
Ludovic Binner, PE Senior Project Manager
Jason Smith, PE Principal
Kaz Kazeminia Principal
Amir Kazeminia PEG
Dan Jeffreys Senior Cost Estimator
Broward County Consulting Services for
Consolidated Facilities Maintenance Building
Coral Springs Westside Maintenance
Facility Master Plan
Coral Springs Westside Fire Administration and
Fire Academy Building
Delray Beach City Hall Assessment Study
Delray Beach, Florida
Delray Beach Police Department Assessment
Study, Delray Beach Florida
City of Coral Springs City Hall Programming Coral
Springs
Port St. Lucie Needs Assessment Facility, Port St.
Lucie, Florida
Tamarac Water Treatment Building
Tamarac, Florida
Highway & Bridge Maintenance Div Admin Building
Expansion Broward County, Fl
Prolexic Space Plans, Fort Lauderdale, Florida
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’SQUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY NUMBER
ONE
21. TITLE AND LOCATION (City and State)
Village of Palm Springs Police Building - Architectural Programming and
Building Conditions Assessment Report, Lake Worth, Florida
22. YEAR COMPLETED
PROFESSIONAL SERVICES
Current
CONSTRUCTION (If applicable)
N/A
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
Village of Palm Springs
B. POINT OF CONTACT NAME
Sebastian Velazquez Feliu, Project Manager
C. POINT OF CONTACT TELEPHONE NUMBER
561.655.2423
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
PROJECT SCOPE
OCI Associates was selected as a sub-consultant to an Architectural firm to
provide a Due Diligence Report and Building Conditions Assessment of an
existing Police Station building located in Lake Worth. Our team members were
required to provide a site visit and evaluate the following building systems;
· Mechanical Systems
· Electrical Systems
· Plumbing Systems
· Fire Protection Systems
· Low Voltage Systems
After the evaluation, our team provided a report of findings such as the general
condition, MEP engineer’s opinion of overall serviceability and longevity as well
as our recommendation for remedial repair or a completed replacement of the
systems and a probable cost estimate. The report was provided to the Owner;
Village of Palm Springs for them to determine the future needs of using the
space for their employees.
ROLE
Mechanical, Electrical, Plumbing & Fire Protection, ITS Engineering Assessment
KEY TEAM MEMBERS · Amir Kazeminia, PE | Principal in Charge* · Sudharma Wijegunawardana, PE, LEED AP, LC | Project Manager + EEOR* · Jason Diehl | Senior Mechanical Engineer* · Jason Smith, PE, LEED AP, BD+C, CEM | Mechanical Engineer of Record* · Kaz Kazeminia, NICET | Director of Plumbing & Fire Protection* · Nick Wilkie, Plumbing & Fire Protection*
(*) The key team members from this project will be assigned to your contract
a.(1) FIRM NAME
OCI Associates, Inc.
(2) FIRM LOCATION (City and State)
Maitland, Florida
(3) ROLE
MEP/FP/ITS/AV Engineering
b.
(1) FIRM NAME
OCI Associates, Inc.
(2) FIRM LOCATION (City and State)
West Palm Beach, Florida
(3) ROLE
Project Management + Electrical
Engineering
PROJECT RELEVANCY
✓Police Station
✓Secure Facility
✓Law Enforcement Owner
✓MEP/FP/ITS Systems Evaluation
✓Due Diligence Report
✓Existing Government Facility
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’SQUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY NUMBER
TWO
21. TITLE AND LOCATION (City and State)
Palm Beach Sheriff's Office Headquarters Annex - Architectural Programming
and Building Conditions Assessment Report, Palm Beach, Florida
22. YEAR COMPLETED
PROFESSIONAL SERVICES
2019
CONSTRUCTION (If applicable)
N/A
23. PROJECT OWNER’S INFORMATION
A. PROJECT OWNER
Palm Beach Sheriff's Office
B. POINT OF CONTACT NAME
Sebastian Velazquez Feliu, Project Manager
C. POINT OF CONTACT TELEPHONE NUMBER
561.655.2423
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
PROJECT SCOPE
OCI Associates was selected as a sub-consultant to an Architectural firm to
provide a Due Diligence Report and Building Conditions Assessment of the
existing Sheriff's Office headquarters building located in Palm Beach. Our team
members were required to provide a site visit and evaluate the following systems;
· Mechanical Systems
· Electrical Systems
· Plumbing Systems
· Fire Protection Systems
· Low Voltage Systems
After the evaluation, our team provided a report of findings such as the general
condition, MEP engineer’s opinion of overall serviceability and longevity as well
as our recommendation for remedial repair or a completed replacement of the
systems and a probable cost estimate. The report was provided to the Owner;
Palm Beach Sheriff's Office for them to determine the future needs of using the
space for their employees.
ROLE
Mechanical, Electrical, Plumbing & Fire Protection, ITS Engineering Assessment
KEY TEAM MEMBERS · Amir Kazeminia, PE | Principal in Charge* · Sudharma Wijegunawardana, PE, LEED AP, LC | Project Manager + EEOR* · Jason Smith, PE, LEED AP, BD+C, CEM | Mechanical Engineer of Record* · Kaz Kazeminia, NICET | Director of Plumbing & Fire Protection* · Nick Wilkie, Plumbing & Fire Protection*
(*) The key team members from this project will be assigned to your contract
a.(1) FIRM NAME
OCI Associates, Inc.
(2) FIRM LOCATION (City and State)
Maitland, Florida
(3) ROLE
MEP/FP/ITS/AV Engineering
b.
(1) FIRM NAME
OCI Associates, Inc.
(2) FIRM LOCATION (City and State)
West Palm Beach, Florida
(3) ROLE
Project Management + Electrical
Engineering
PROJECT RELEVANCY
✓Sheriffs Headquarters
✓Secure Facility
✓Law Enforcement Owner
✓MEP/FP/ITS Systems Evaluation
✓Due Diligence Report
✓Existing Government Facility
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’SQUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY NUMBER
THREE
21. TITLE AND LOCATION (City and State)
Department of Military Affairs West Palm Beach District Court of Appeal
Renovation, Due Diligence Report and Assessment, Palm Beach, Florida
22. YEAR COMPLETED
PROFESSIONAL SERVICES
Current
CONSTRUCTION (If applicable)
Current
23. PROJECT OWNER’S INFORMATION
A. PROJECT OWNER
Department of Military Affairs
B. POINT OF CONTACT NAME
Sebastian Velazquez Feliu, Project Manager
C. POINT OF CONTACT TELEPHONE NUMBER
561.655.2423
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
PROJECT SCOPE
OCI Associates was selected as a sub-consultant to an Architectural firm to
provide a Due Diligence Report and Building Conditions Assessment of the
existing District Court of Appeal building. Our team members were required to
provide a site visit to the building and evaluate the following systems;
· Mechanical Systems
· Electrical Systems
· Plumbing Systems
· Fire Protection Systems
· Low Voltage Systems
After the evaluation, our team provided a report of findings such as the general
condition, MEP engineer’s opinion of overall serviceability and longevity as well
as our recommendation for remedial repair or a completed replacement of the
systems and a probable cost estimate. The report was provided to the Owner;
and led the team to move forward with a new job order from the Owner to
renovate the existing space into a Readiness Center for the US National Guard;
which OCI is currently designing the new replacement systems for the project.
ROLE
Mechanical, Electrical, Plumbing & Fire Protection, ITS Engineering Assessment
KEY TEAM MEMBERS · Amir Kazeminia, PE | Principal in Charge · Sudharma Wijegunawardana, PE, LEED AP, LC. | Project Manager + Electrical
Engineer of Record · Jason Smith, PE, LEED AP, BD+C, CEM | Mechanical Engineer of Record · Jason Diehl | Senior Mechanical Engineer · Kaz Kazeminia, NICET | Director of Plumbing & Fire Protection · Nick Wilkie, Plumbing & Fire Protection
The key team members from this project will be assigned to your contract
a.(1) FIRM NAME
OCI Associates, Inc.
(2) FIRM LOCATION (City and State)
Maitland, Florida
(3) ROLE
MEP/FP/ITS/AV Engineering
b.
(1) FIRM NAME
OCI Associates, Inc.
(2) FIRM LOCATION (City and State)
West Palm Beach, Florida
(3) ROLE
Project Management + Electrical
Engineering
PROJECT RELEVANCY
✓Justice Center
✓Secure Facility
✓Federal Government Owner
✓MEP/FP/ITS Systems Evaluation
✓Due Diligence Report
✓Existing Government Facility
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’SQUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY NUMBER
FOUR
21. TITLE AND LOCATION (City and State)
Florida Highway Patrol - Orlando International Drive Facility Architectural
Programming and Building Conditions Assessment Report, Orlando, Florida
22. YEAR COMPLETED
PROFESSIONAL SERVICES
2019
CONSTRUCTION (If applicable)
2019
23. PROJECT OWNER’S INFORMATION
A. PROJECT OWNER
Florida Highway Patrol
B. POINT OF CONTACT NAME
Christopher Sorvillo, Captain
C. POINT OF CONTACT TELEPHONE NUMBER
954-914-3515
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
PROJECT SCOPE
OCI Associates was selected as a sub-consultant to an Architectural firm to
provide a Due Diligence Report and Building Condition Assessment of an existing
building located at 11059 International Drive, Orlando. Our team members
were required to provide a site visit to the two-story building and evaluate the
following systems;
· Mechanical Systems
· Electrical Systems
· Plumbing Systems
· Fire Protection Systems
· Low Voltage Systems
After the evaluation, our team provided a report of findings such as the general
condition, MEP engineer’s opinion of overall serviceability and longevity as well
as our recommendation for remedial repair or a completed replacement of the
systems and a probable cost estimate. The report was provided to the Owner;
Florida Highway Patrol for them to determine the future needs of using the
space for their employees.
ROLE
Mechanical, Electrical, Plumbing & Fire Protection, ITS Engineering Assessment
KEY TEAM MEMBERS · Amir Kazeminia, PE | Principal in Charge · Jason Diehl | Project Manager + Senior Mechanical Engineer · Jason Smith, PE, LEED AP, BD+C, CEM | Mechanical Engineer of Record
The key team members from this project will be assigned to your contract
a.(1) FIRM NAME
OCI Associates, Inc.
(2) FIRM LOCATION (City and State)
Maitland, Florida
(3) ROLE
MEP/FP/ITS/AV Engineering
b.
PROJECT RELEVANCY
✓Florida Highway Patrol
✓Secure Facility
✓Law Enforcement Owner
✓MEP/FP/ITS Systems Evaluation
✓Due Diligence Report
✓Existing Government Facility
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’SQUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY NUMBER
FIVE
21. TITLE AND LOCATION (City and State)
Osceola County West Command Center - Architectural Programming and
Building Conditions Assessment Report, Kissimmee, Florida
22. YEAR COMPLETED
PROFESSIONAL SERVICES
2019
CONSTRUCTION (If applicable)
N/A
23. PROJECT OWNER’S INFORMATION
A. PROJECT OWNER
Osceola County
B. POINT OF CONTACT NAME
Conrad Ballance Project Manager
Tim Wagoner, Architectural Project Manager
C. POINT OF CONTACT TELEPHONE NUMBER
407-742-0525
407-093-9389
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
PROJECT SCOPE
OCI Associates was selected as a sub-consultant to an Architectural firm to
provide a Due Diligence Report and Building Conditions Assessment of an
abandoned big box retail space to convert it into a $5.5 million West Command
Center for the growing West region in the county. Our team members were
required to provide a site visit to the building and evaluate the following systems;
· Mechanical Systems
· Electrical Systems
· Plumbing Systems
· Fire Protection Systems
· Low Voltage Systems
After the evaluation, our team provided a report of findings such as the general
condition, MEP engineer’s opinion of overall serviceability and longevity as well
as our recommendation for remedial repair or a completed replacement of the
systems and a probable cost estimate. The report was provided to Osceola
County for them to determine the future needs of using the space for their
employees.
ROLE
Mechanical, Electrical, Plumbing & Fire Protection, ITS Engineering Assessment
KEY TEAM MEMBERS · Amir Kazeminia, PE | Principal in Charge · Art Munns, CxA | Project Manager + Director of Building Commissioning · Jason Smith, PE, LEED AP, BD+C, CEM | Mechanical Engineer of Record
The key team members from this project will be assigned to your contract
a.(1) FIRM NAME
OCI Associates, Inc.
(2) FIRM LOCATION (City and State)
Maitland, Florida
(3) ROLE
MEP/FP/ITS/AV Engineering
b.
PROJECT RELEVANCY
✓MEP/FP/ITS Systems Evaluation
✓Due Diligence Report
✓Existing Retail Facility
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’SQUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY NUMBER
SIX
21. TITLE AND LOCATION (City and State)
St. Lucie County - Port St. Lucie Branch Library Architectural Programming and
Building Conditions Assessment Report, Port St. Lucie, Florida
22. YEAR COMPLETED
PROFESSIONAL SERVICES
2021
CONSTRUCTION (If applicable)
N/A
23. PROJECT OWNER’S INFORMATION
A. PROJECT OWNER
St. Lucie County
B. POINT OF CONTACT NAME
Scotty Beaulieu, Project Manager
Rob Castrovinci,Architectural Project Manager
C. POINT OF CONTACT TELEPHONE NUMBER
772-462-1432 | beaulieus@stlucieco.org
561.313.2021
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
PROJECT BACKGROUND
Opened on December 1, 1971, the original 1,500 sq. ft. branch was constructed
and donated to the County by the General Development Corporation. In 1981,
the branch was expanded to 4,500 sq. ft. Approximately 150,000 people live
within a 5-mile radius of the Prima Vista location. Popular from its inception,
this tiny branch does high volume circulation and youth programming. The
present building is structurally sound but worn and is increasingly outmoded.
PROJECT SCOPE
OCI Associates was selected as a sub-consultant to an Architectural firm to
provide a Due Diligence Report and Building Conditions Assessment of an
existing 6,000 -square-foot library to determine whether to expand the facility
or build a new one. Our team members provided a site visit to the library and
evaluate the following systems;
· Mechanical Systems
· Electrical Systems
· Plumbing Systems
· Fire Protection Systems
After the evaluation, our team provided a report of our findings such as the
general condition, MEP engineer’s opinion of overall serviceability and longevity
as well as our recommendation for remedial repair or a completed replacement
of the systems and a probable cost estimate. The report determined that
the telecommunication cabling has been run as needed over the years
but is inadequate for current needs. The Youth areas, stacks, community
meeting room and staff areas are all inadequate and a new building has been
determined as the best possible outcome for the district.
ROLE
Mechanical, Electrical, Plumbing & Fire Protection, Engineering Assessment
KEY TEAM MEMBERS · Amir Kazeminia, PE | Principal in Charge · Sudharma Wijegunawardana, PE, LEED AP, LC | Electrical Engineer of Record · Jame Burchard | Project Manager
a.(1) FIRM NAME
OCI Associates, Inc.
(2) FIRM LOCATION (City and State)
Maitland, Florida
(3) ROLE
MEP/FP Engineering
b.
(1) FIRM NAME
OCI Associates, Inc.
(2) FIRM LOCATION (City and State)
West Palm Beach, Florida
(3) ROLE
Electrical Engineering
PROJECT RELEVANCY
✓MEP/FP Systems Evaluation
✓Due Diligence Report
✓Existing Community Facility
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’SQUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY NUMBER
SEVEN
21. TITLE AND LOCATION (City and State)
School District of Palm Beach County - West Technical Education Center
Programming & Building Conditions Assessment & Report Belle Glade, Florida
22. YEAR COMPLETED
PROFESSIONAL SERVICES
2021
CONSTRUCTION (If applicable)
Ongoing
23. PROJECT OWNER’S INFORMATION
A. PROJECT OWNER
School District of Palm Beach County
B. POINT OF CONTACT NAME
Jorge Fuentes, Architectural Project Manager
C. POINT OF CONTACT TELEPHONE NUMBER
561-655-2423
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
PROJECT SCOPE
OCI Associates was selected as a sub-consultant to an Architectural firm to
provide a Due Diligence Report and Building Conditions Assessment of a
education center in Belle Glades. Our team members were required to provide a
site visit to the building and evaluate the following systems;
· Mechanical Systems
· Electrical Systems
· Plumbing Systems
· Fire Protection Systems
· Low Voltage Systems
After the evaluation, our team provided a report of findings such as the general
condition, MEP engineer’s opinion of overall serviceability and longevity as well
as our recommendation for remedial repair or a completed replacement of the
systems and a probable cost estimate. The report was provided to the School
District of Palm Beach County for them to determine the future needs of using
the space for their employees.
ROLE
Mechanical, Electrical, Plumbing & Fire Protection Engineering Assessment
KEY TEAM MEMBERS · Amir Kazeminia, PE | Principal in Charge* · Sudharma Wijegunawardana, PE, LEED AP, LC | Project Manager + EEOR* · Jason Smith, PE, LEED AP, BD+C, CEM | Mechanical Engineer of Record* · Kaz Kazeminia, NICET | Director of Plumbing & Fire Protection*
(*)The key team members from this project will be assigned to your contract
a.(1) FIRM NAME
OCI Associates, Inc.
(2) FIRM LOCATION (City and State)
Maitland, Florida
(3) ROLE
MEP/FP/ITS/AV Engineering
b.
(1) FIRM NAME
OCI Associates, Inc.
(2) FIRM LOCATION (City and State)
West Palm Beach, Florida
(3) ROLE
Project Management + Electrical
Engineering
PROJECT RELEVANCY
✓MEP/FP/ITS Systems Evaluation
✓Due Diligence Report
✓Existing Facility
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’SQUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY NUMBER
EIGHT
21. TITLE AND LOCATION (City and State)
Okeechobee County Health Department HVAC Feasibility Report
Okeechobee, Florida
22. YEAR COMPLETED
PROFESSIONAL SERVICES
2021
CONSTRUCTION (If applicable)
N/A
23. PROJECT OWNER’S INFORMATION
A. PROJECT OWNER
Okeechobee County
B. POINT OF CONTACT NAME
Donnie Oden, Facilities Director
C. POINT OF CONTACT TELEPHONE NUMBER
813-763-0805
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
PROJECT SCOPE
OCI Associates was selected as a sub-consultant to an Architectural firm to
provide a Due Diligence Report and Building Conditions Assessment of a
education center in Belle Glades. Our team members were required to provide a
site visit to the building and evaluate the following mechanical spaces in attics or
replace all units with an air-cooled chiller with AHU’s and VAV system.
After the evaluation, our team provided a report of findings such as the general
condition, MEP engineer’s opinion of overall serviceability and longevity as well
as our recommendation for remedial repair or a completed replacement of the
systems and a probable cost estimate. The report was provided to the County
for them to determine the future needs of using the space for their employees.
ROLE
Mechanical Engineering Assessment
KEY TEAM MEMBERS · Amir Kazeminia, PE | Principal in Charge* · Art Munns, CxA | Project Engineer - Mechanical*
(*) The key team members from this project will be assigned to your contract
a.(1) FIRM NAME
OCI Associates, Inc.
(2) FIRM LOCATION (City and State)
Maitland, Florida
(3) ROLE
MEP/FP/ITS/AV Engineering
b.
PROJECT RELEVANCY
✓Mechanical Systems Evaluation
✓Due Diligence Report
✓Existing Community Facility
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’SQUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY NUMBER
NINE
21. TITLE AND LOCATION (City and State)
City of Hollywood Police Headquarters + Cx
Hollywood, Florida
22. YEAR COMPLETED
PROFESSIONAL SERVICES
Current
CONSTRUCTION (If applicable)
Est. 2024
23. PROJECT OWNER’S INFORMATION
A. PROJECT OWNER
City of Hollywood
B. POINT OF CONTACT NAME
Heather Baburek Guenot, PE,
Senior Project Manager
C. POINT OF CONTACT TELEPHONE NUMBER
954-649-4389
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
BACKGROUND
The City of Hollywood operates a full service police department for its 150,000
residents and over 100,000 annual visitors; the City’s voters recently approved
a General Obligation Bond, which included funding to replace the current Police
Headquarters Building with a new facility. The existing Police Headquarters
Building is a four story approximately 76,040 SF facility, located at the SE corner
of Hollywood Blvd and Park Road. The department currently has a total of 426
full time positions, both sworn and civilian employees. The current 1970’s police
station is outdated and cramped and was approved by tax payers to design a
new facility in 2020.
PROJECT SCOPE
The planned 4-story building will double the size of the existing police station
incorporating much needed new technology that isn’t available on the current
electrical grid. Features of the station will include a much larger property &
evidence room, training and gun range, quartermaster, patrol, holding cells,
detective units, recruitment, administration and public information for 425
employees with room to grow. A new structured parking for approximately 350
vehicles will be included in the project with a high first floor bay for large vehicle
storage.
SIZE
110,000 - 20,000 SF
COST
$72.5 Million
ROLE
Mechanical, Electrical, Plumbing & Fire Protection Engineering, Commissioning
KEY TEAM MEMBERS · Amir Kazeminia, PE | Principal in Charge* · Jason Diehl | Senior Mechanical Engineer* · Art Munns, CxA | Project Manager + Director of Building Commissioning*
(*)The key team members from this project will be assigned to your contract
a.(1) FIRM NAME
OCI Associates, Inc.
(2) FIRM LOCATION (City and State)
Maitland, Florida
(3) ROLE
MEP/FP/ITS/AV Engineering
b.(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
PROJECT RELEVANCY
✓Police Station
✓Secure Facility
✓Law Enforcement Owner
✓MEP/FP/ITS Systems Design
✓Local to Sunny Isles Beach
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’SQUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified. Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY NUMBER
TEN
21. TITLE AND LOCATION (City and State)
Florida Highway Patrol Troop D Station Facility Assessment
Orlando, Florida
22. YEAR COMPLETED
PROFESSIONAL SERVICES
2019
CONSTRUCTION (If applicable)
N/A
23. PROJECT OWNER’S INFORMATION
A. PROJECT OWNER
Florida Highway Patrol
B. POINT OF CONTACT NAME
Christopher Sorvillo, Captain
C. POINT OF CONTACT TELEPHONE NUMBER
954-914-3515
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost)
PROJECT SCOPE
OCI Associates was selected as a sub-consultant to an Architectural firm to
provide a Due Diligence Report and Building Conditions Assessment of a 10,400
SF headquarters building roof replacement. Our team members were required
to provide a site visit to the building and evaluate the following systems;
· Lightning Protection Evaluation of the existing Mechanical Systems
After the evaluation, our team provided a report of findings such as the general
condition, MEP engineer’s opinion of overall serviceability and longevity as well
as our recommendation for remedial repair or a completed replacement of
the systems and a probable cost estimate. The report was provided to Florida
Highway Patrol for them to determine the future needs of using the space for
their employees.
With Department of management Services (DMS). Cocoa HQ Building Roof
Replacement 10,400 SF Existing building needs a lightening protection
evaluation of existing mechanical systems, a report of findings such as general
condition, MEP engineer’s opinion of overall serviceability/longevity as well as
recommendation for remedial repair or replacement.
ROLE
Mechanical, Electrical, Plumbing & Fire Protection Engineering Evaluations
KEY TEAM MEMBERS · Amir Kazeminia, PE | Principal in Charge* · Jason Diehl | Senior Mechanical Engineer* · Jason Smith, PE, LEED AP, BD+C, CEM | Mechanical Engineer of Record*
(*)The key team members from this project will be assigned to your contract
a.(1) FIRM NAME
OCI Associates, Inc.
(2) FIRM LOCATION (City and State)
Maitland, Florida
(3) ROLE
Lightning Protection Engineering
b.(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
c.(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE
PROJECT RELEVANCY
✓Lightning Protection Evaluation
✓Due Diligence Report
✓Existing Commercial Facility
AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (1/2004) PAGE 3
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY NUMBER
21. TITLE AND LOCATION (City and State)
Miami-Dade County Internal Services Department - Mental
Health Diversion Facility Renovation
Miami, FL
22. YEAR COMPLETED
PROFESSIONAL SERVICES
2017
CONSTRUCTION (If applicable)
N/A
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
Miami-Dade County
c/o SBLM Architects, Inc.
b. POINT OF CONTACT NAME
Glenn Lurie, AIA LEED AP/Architect
c. POINT OF CONTACT TELEPHONE NUMBER
(305) 412-9187
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost.)
Description: Buildout/Rehabilitation/Renovation of this seven-story facility for mentally ill defendants incapable to stand trial.
Renovations will be to 1st floor for general and secured entry, administrative and security areas, courtroom(s), judicial areas
and judicial support staff spaces, and space for day activity/vocational training purposes, including a new elevator to connect
1st and 2nd floors. The 2nd floor will be reconfigured to include a CSU, classroom/conference room space, and miscellaneous
space for treatment and support services providers. The 3rd floor holds a mechanical area which will be renovated to meet
current building code requirements. Patient rooms and support spaces located on floors 4th through 7th will be renovated for
use as short-term residential treatment programs.
All mechanical, plumbing, electrical, building management and fire safety system components must be upgraded, including but
not limited to, fire alarm, sprinkler system, security system, fire protection, generator and storage tank, building management
systems, and smoke evacuation systems. Existing elevators will be refurbished and modernized, paint in interior and exterior
areas will be re-applied, and electrical and plumbing fixtures will be retrofitted and/or replaced as required. In addition,
telecommunication and data requirements will be updated to meet the requirements of the County’s Information Technology
Department (ITD). Exterior building openings are to be properly sealed/caulked as required and correctional-type components
are to be removed as requested by the Agency. The existing parking lot is to be re-paved, re-stripped, and its site lighting
upgraded. All damaged exterior glazing will be replaced, and new storm protection assembly will be provided. Door hardware,
flooring, ceilings, finishes, and Mechanical, Electrical and Plumbing components will be replaced as required to accommodate
the new programming requirements.
Size: Project Site Size = 214,382 SF; Building = 181,324 SF
Cost: $39,184,118.00
Scope of Work: Schematic Design / Construction Documents Cost Estimating
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME
CMS-Construction Management
Services, Inc.
(2) FIRM LOCATION (City and State)
10 Fairway Drive
Suite 301
Deerfield Beach, FL 33441
(3) ROLE
Cost Estimating
b.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) ROLE
c.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) ROLE
d.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) ROLE
AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (1/2004) PAGE 4
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY NUMBER
21. TITLE AND LOCATION (City and State)
Apotex Florida Expansion – Phases A, B and C
Miramar, FL
22. YEAR COMPLETED
PROFESSIONAL SERVICES
2018
CONSTRUCTION (If applicable)
N/A
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
Apotex, Inc.
Toronto, Canada
b. POINT OF CONTACT NAME
Dwight Trotter/Global Director, Capital
Engineering
c. POINT OF CONTACT TELEPHONE NUMBER
1-800 268-4623
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost.)
Description: Interior buildout of the existing facility by adding another floor. Apotex Inc., the largest Canadian-owned
pharmaceutical company, will create 150 full-time jobs in Broward County as part of a $184 million U.S. expansion. The
company is developing a new research and development center and an advanced manufacturing and packaging facility in
Miramar, which will serve as the U.S. headquarters for Apotex and offices for Apobiologix. Its U.S. offices are currently in
Weston. Construction of the facility began in 2017 and is expected to be completed in early 2019.
Size: Project Site Size = 165,400 SF
Cost: $24,999,989.00
Scope of Work: Construction Documents Cost Estimating
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME
CMS-Construction Management
Services, Inc.
(2) FIRM LOCATION (City and State)
10 Fairway Drive
Suite 301
Deerfield Beach, FL 33441
(3) ROLE
Cost Estimating
b.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) ROLE
c.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) ROLE
AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (1/2004) PAGE 5
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY NUMBER
21. TITLE AND LOCATION (City and State)
City of Lake Worth – Beach Complex Casino Building
Lake Worth, FL
22. YEAR COMPLETED
PROFESSIONAL SERVICES
2018
CONSTRUCTION (If applicable)
N/A
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
City of Lake Worth, FL
c/o CPZ Architects, Inc.
b. POINT OF CONTACT NAME
Mr. Chris P. Zimmerman, AIA –
President
c. POINT OF CONTACT TELEPHONE NUMBER
(954) 792-8525
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost.)
Description: On the shores of the Atlantic Ocean, newly reconstructed Lake Worth Casino Building and renovated Beach
Complex officially opened to the public on March 1, 2013. The new casino building remains true to the original 1920's
architecture; and while there is no gambling at the new building, the name "Casino" remains as a reminder of the history and
importance of the building to the citizens of Lake Worth.
In 2018 CMS provided Cost Estimating for the renovation of existing oceanfront municipal park including new casino
building, service area, swimming pool, drop-off area, stage area, maintenance facility, parking lots/parking garage and stair
elevator tower.
Size: 13 Acres
Cost: Five different schemes ranging from $18,161,285.00 to $59,015,031.00
Scope of Work: Order of Magnitude Cost Estimating
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME CMS-Construction Management
Services, Inc.
(2) FIRM LOCATION (City and State) 10 Fairway Drive, Suite 301
Deerfield Beach, FL 33441
(3) ROLE Cost Consulting / Cost Estimating
b.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) ROLE
AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (1/2004) PAGE 6
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY NUMBER
21. TITLE AND LOCATION (City and State)
City of Coral Springs – Westside Maintenance Facility
Coral Springs, FL
22. YEAR COMPLETED
PROFESSIONAL SERVICES
2020
CONSTRUCTION (If applicable)
N/A
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
City of Coral Springs, FL
c/o CPZ Architects, Inc.
b. POINT OF CONTACT NAME
Mr. Chris P. Zimmerman, AIA
President
c. POINT OF CONTACT TELEPHONE NUMBER
(954) 792-8525
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost.)
2014: Description: This project involved three Phases for the construction of a new Central Stores/Offices Building, a new
Vehicle Maintenance Facility, and a new Parking Lot.
Phase I – Construction of a new Central Stores/Offices (including Site Work)
Phase II – Construction of a new Vehicle Maintenance Facility (including Site Work)
Phase III – Construction of a new Parking Lot (including Site Work)
Size: Vehicle Maintenance Facility = 16,900 SF; Central Stores/Offices Building Size = 17,7341 SF; Parking Lot = 27,345 SF
Cost: Central Stores/Offices = $2,724,852.00; Maintenance Facility = $4,506,840.00; Parking Lot = $728,080.00
Specific Role: Order of Magnitude Cost Estimating
2018 -2020: CMS was asked again by CPZ Architects, Inc. of Plantation, Florida to provide an Order of Magnitude
Cost Estimate for Coral Spring’s Westside Maintenance Facility Master Plan project which involved the interior
demolition and buildout of the existing 50,026 SF, one-story Maintenance Facility, by the addition of a 26,000 SF
second story. Also, included is sitework, utilities, lighting, paving, and landscaping.
• Scope of Work: Order of Magnitude (2018) / Construction Documents Cost Estimating (2019-2020)
• Total Probable Cost: $28,471,800.00
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME CMS-Construction Management
Services, Inc.
(2) FIRM LOCATION (City and State) 10 Fairway Drive, Suite 301
Deerfield Beach, FL 33441
(3) ROLE Cost Estimating
AUTHORIZED FOR LOCAL REPRODUCTION MANDATORY USE DATE OF FORM 6/2004 STANDARD FORM 330 (1/2004) PAGE 7
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S
QUALIFICATIONS FOR THIS CONTRACT
(Present as many projects as requested by the agency, or 10 projects, if not specified.
Complete one Section F for each project.)
20. EXAMPLE PROJECT KEY NUMBER
21. TITLE AND LOCATION (City and State)
Broward County – West Regional Courthouse (Phase II) –
Clerk of Courts, Civil & Marriage
Plantation, FL
22. YEAR COMPLETED
PROFESSIONAL SERVICES
2020
CONSTRUCTION (If applicable)
N/A
23. PROJECT OWNER’S INFORMATION
a. PROJECT OWNER
Broward County, FL
c/o CPZ Architects, Inc.
b. POINT OF CONTACT NAME Michael Walkowski, Associate AIA,
LEED GA / Project Manager
c. POINT OF CONTACT TELEPHONE NUMBER
(954) 792-8525
24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost.)
Description: CMS was asked by CPZ Architects, Inc. of Plantation, Florida to provide Cost Estimates for the
interior renovation (buildout) of the existing space of this courthouse which included demolition and installation of
new floors, ceilings, ballistic-resistant windows painting, replacing of furniture, doors, carpeting, fire extinguishers,
HVAC, and adjusting Mechanical/Electrical/Plumbing to reflect the new layout of space.
Size: 11,600 SF
Cost: $1,686,039.00
Specific Role: Construction Documents Cost Estimating
25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT
a.
(1) FIRM NAME CMS-Construction Management
Services, Inc.
(2) FIRM LOCATION (City and State) 10 Fairway Drive, Suite 301
Deerfield Beach, FL 33441
(3) ROLE Cost Estimating
b.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) ROLE
c.
(1) FIRM NAME
(2) FIRM LOCATION (City and State)
(3) ROLE
H. ADDITIONAL INFORMATION
31. SIGNATURE 32. DATE
November 23rd, 2021
33. NAME AND TITLE
Amir Kazeminia, PE President + CEO
OCI ASSOCIATES, INC.
Founded in 1987, OCI Associates, Inc. serves clients by providing mechanical, electrical (IT/AV), plumbing, fire protection
engineering; commissioning services, and construction administration. We are headquartered in Orlando, with offices in
Fort Pierce, West Palm Beach, Miami, Fort Myers, Tampa, Washington D.C., Baltimore, Norfolk, Dallas, and San Francisco.
Current Law Enforcement Project Experience
Palm Beach Sheriff’s Office new 25,250 SF, $6.9 Mil D1 & Marine Unit – West Palm Beach, Florida
City of Greenacres 730 SF Public Safety EOC Conversion –Lake Worth, Florida
City of Casselberry new 25,000 SF, $87 Mil Police Department – Casselberry, Florida
The Village of Royal Palm Beach 19,000 SF, $6.5 Mil EOC & Palm Beach Sheriff’s Office Modification –Florida
City of Hollywood new 120,000 SF, $72.5 Mil Police Headquarters and Parking Garage – Hollywood, Florida
University of Florida new 36,000 SF, $25 Mil Public Safety Complex – Gainesville, Florida
San Francisco International Airport US Customs & Border Protection Improvement – San Francisco, California
San Francisco International Airport Terminal 1 Police Substation Renovation – San Francisco, California
Completed Law Enforcement Project Experience
Florida Highway Patrol Orlando I-Drive Facility Assessment - Orlando, Florida
The City of Jupiter new 38,823 SF, $20 Mil Municipal Complex – Jupiter, Florida
Palm Beach County Sheriff’s Office HQ Annex & EOC Due Diligence Report – West Palm Beach, Florida
Ft. Myers Police Station HVAC System Evaluation & Report for Domestic Waste Replacement – Ft. Myers, Florida
US Customs & Border Protection – Martin County Airport, Stuart, Florida
Volusia County Sheriff's Office new 29,656 SF, $11.8 Mil Evidence Facility – Daytona Beach, Florida
City of Winter Park new 79,000 SF, $8 Mil Public Safety Operations Center – Winter Park, Florida
City of Palm Beach Gardens Veterans Plaza Expansion – West Palm, Florida
US Customs & Border Protection new 4,545 SF, $4.3 Mil Facility – Boca Raton Aviation Authority, Florida
City of Ft. Myers Police Department Upgrade – Ft. Myers, Florida
US Customs & Border Protection new 76,000 SF Terminal at Orion Jet Center, Opa-Locka Executive Airport – Florida
Volusia County Sheriff’s IT Building Upgrades – Daytona Beach, Florida
City of Oviedo Public Safety Complex Upgrade – Oviedo, Florida
City of Lake Worth Police Department Modifications – Lake Worth, Florida
City of Winter Springs Police Department Addition – Winter Springs, Florida
Hernando County Sheriff’s Department Administration Building – Brooksville, Florida
City of Okeechobee Police Department – Okeechobee, Florida
City of Ormond Beach Police Station – Ormond Beach, Florida
City of Winter Haven Police Station – Winter Haven, Florida
City of Auburndale Police Station – Auburndale, Florida
Polk County Sheriff’s East Command Center – Lakeland, Florida
City of Winter Springs Police Department – Winter Springs, Florida
K-9 Training Facility – Florida
Pඈඅංർൾ Sඍൺඍංඈඇ ൺඇൽ Fංඋൾ A ൽආංඇංඌඍඋൺඍංඈඇ
SECTION 7
4316 W BROWARD BLVD
PLANTATION, FL 33317
Current Principal Place of Business:
Current Mailing Address:
4316 W BROWARD BLVD
PLANTATION, FL 33317
Entity Name: CPZ ARCHITECTS, INC.
DOCUMENT# P02000128253
FEI Number: 57-1140055 Certificate of Status Desired:
Name and Address of Current Registered Agent:
DELGADO, ANGELA
665 SE 10TH STREET
201
DEERFIELD BEACH, FL 33441 US
The above named entity submits this statement for the purpose of changing its registered office or registered agent, or both, in the State of Florida.
SIGNATURE:
Electronic Signature of Registered Agent Date
Officer/Director Detail :
I hereby certify that the information indicated on this report or supplemental report is true and accurate and that my electronic signature shall have the same legal effect as if made under
oath; that I am an officer or director of the corporation or the receiver or trustee empowered to execute this report as required by Chapter 607, Florida Statutes; and that my name appears
above, or on an attachment with all other like empowered.
SIGNATURE:
Electronic Signature of Signing Officer/Director Detail Date
ANGELA DELGADO
FILED
Mar 16, 2021
Secretary of State
1232801076CC
CHRIS ZIMMERMAN PRESIDENT 03/16/2021
2021 FLORIDA PROFIT CORPORATION ANNUAL REPORT
Yes
03/16/2021
Title DP
Name ZIMMERMAN, CHRIS P
Address 1961 SW 68 AVE
City-State-Zip:PLANTATION FL 33317
Title SECRETARY
Name ZIMMERMAN, KIM
Address 4316 W BROWARD BLVD
City-State-Zip:PLANTATION FL 33317
Bඈඒ Sർඈඎඍඌ ඈൿ A ආൾඋංർൺ ඈൿ Sඈඎඍඁ Fඅඈඋංൽൺ
Nඈඇ Dൾඇඈආංඇൺඍංඈඇ Cඁൺඉൾඅ
SECTION 8
C P Z
CPZ ARCHITECTS, INC.
4316 WEST BROWARD BOULEVARD, PLANTATION, FLORIDA 33317
1601 BELVEDERE RD., S-350, WEST PALM BEACH, FL 33406
200 N. EL MAR DRIVE, SUITE 201B, JENSEN BEACH, FLORIDA 34957
(954) 792-8525 AA# 26000685 WWW.CPZARCHITECTS. COM
CERTIFICATE OF INSURANCE
CPZ Architects, Inc.
4316 West Broward Boulevard, Plantation, Florida 33317
1601 Belvedere Rd., S-350, West Palm Beach, Florida 33406
200 N. El Mar Drive, Suite 201B, Jensen Beach, Florida 33317
“Designing Quality Architecture
That Builds
Lasting Relationships”
Thank You
For The Opportunity!