Loading...
HomeMy WebLinkAboutMiller Legg Response to RFQ No 22-06-01 Continuing Services for Landscape Architectural Services CCNARequest for Qualifications RFQ No. 22-06-01 CONTINUING SERVICES FOR LANDSCAPE ARCHITECTURAL SERVICES CCNA June 29, 2022 Miller Legg Proposal 22-P0228 COPY June 29, 2022 City Clerk City of Sunny Isles Beach Governmental Center 18070 Collins Avenue, 4th Floor Sunny Isles Beach, FL 33160 CONTINUING SERVICES FOR LANDSCAPE ARCHITECTURAL SERVICES RFQ #22-06-01 Dear Selection Committee: Miller Legg is very pleased to submit our qualifications for your consideration in the selection of Landscape Architecture consultants for Sunny Isles Beach, “The City of Sun and Sea”. This submittal details our firm’s qualifications, capabilities, team members and relevant experience. Miller Legg has provided landscape architecture and consulting services for municipal projects over the last 57 years. Our firm provides a knowledgeable Team of experienced professionals and a staff of 50 dedicated employees who are committed to satisfying the needs of Sunny Isles Beach. Our Miami-Dade office will afford you the local presence, responsiveness and continuity to fulfill this Contract. Miller Legg has successfully provided continuing contract services to many South Florida municipalities over the past 57 years including: Miami, Miami Beach, Miami Lakes, Coral Gables, Homestead, Fort Lauderdale, Lauderhill, Pembroke Pines, Coral Springs, Coconut Creek, Tamarac, Oakland Park, Plantation, Pompano Beach, Dania Beach, Hollywood, Miramar, as well as similar county, school board, and Florida Department of Transportation (FDOT) contracts in the tri-county region. We look forward to continuing this tradition by serving the City of Sunny Isles Beach as your trusted consultant for Landscape Architectural services under this Contract. Miller Legg has been responsible for many award-winning landscape architecture projects in South Florida and Miami-Dade County. Our relationship with the City of Sunny Isles Beach includes the award-winning design of Pelican Community Park, for which we provided landscape architecture, irrigation, engineering, surveying, grant assistance and construction observation. In addition, we supported the reconstruction of existing natural turf fields to artificial turf at both Pelican Community Park and Senator Gwen Margolis Park. This experience combined with our firm’s extensive portfolio of representative beautification and improvement projects corresponds to key elements described in this solicitation’s scope of services. For this compelling reason, we are confident that we will deliver to you the landscape architecture skills, experience and professional integrity necessary to successful project performance. As Principal-in-Charge, I will collaborate extensively with Project Manager Brian Shore, RLA, and Assistant Project Manager, Miguel Juncal, RLA, CA. With an extensive background in landscape architecture and land planning, I assure you that our Team will provide landscape architectural designs that are functional, feasible, aesthetically pleasing while reflecting upon Sunny Isles Beach history and considering a resilient future. For this Contract, we have assembled a body of landscape architecture expertise from within the firm with a strong collective background in serving public clients in South Florida. In Brief… Our Landscape Architecture Services: Recreational Planning Hardscape & Urban Design Design Guidelines & Standards Streetscape Project Theming & Signage Horticultural Consulting & Arboriculture Planting Design Irrigation Design Landscape Inspection Services Master Planning Grants Application Plans Review Contract Administration Construction Observation Page 2 Page 3Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA I assure you that the City will have the Miller Legg Team’s corporate commitment of staff and resources for any of the projects under this consulting Contract. Should you require any additional information, please don’t hesitate to contact me at (305) 599-6381 or email at mkroll@millerlegg.com. We very much appreciate the opportunity to present our credentials to you in the following qualifications package. Sincerely, Michael D. Kroll, RLA, FASLA President of Miller Legg Principal-in-Charge Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA Page 41. Cover Page Page 5Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 1. Cover Page Response to: City of Sunny Isles Beach Request for Qualifications #22-06-01 Continuing Services Landscape Architectural Services CCNA Submitted by: Miller Legg Michael Kroll, RLA, FASLA, President 1845 NW 112th Avenue, Suite 211 Miami, FL 33172 305.599.6381 mkroll@millerlegg.com June 29, 2022 Miller Legg has extensive experience in providing the services that may be performed under this Contract. These services include, but are not limited to, landscape architecture, conceptual design, design development, site plan review, preparation of documents and permitting services. Miller Legg commits to providing the staff and resources for any of the projects under this consulting contract and perform these services within the City’s required time frame. Miller Legg believes we are the best qualified firm to provide landscape architectural services to Sunny Isles Beach. We have provided landscape architecture and consulting services for municipal projects over the last 57 years. Our firm provides a knowledgeable Team of experienced professionals and a staff of 50 dedicated employees who are committed to satisfying the needs of Sunny Isles Beach. With a Miami-Dade office, we can afford you the local presence, responsiveness and continuity to fulfill this Contract. Lastly, Miller Legg successfully delivered the award winning Pelican Community Park and received recognition from the City for our involvement in the design completion of the Park. Page 6Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 1. Cover Page City of Sunny Isles Beach | 25 SECTION 6 BID FORM 1 RFP Title: LANDSCAPE ARCHITECT SERVICES The undersigned Vendor proposes and agrees, if this Bid is accepted, to enter into an agreement with The City of Sunny Isles Beach to perform and furnish all Services as specified or indicated in the Contract Documents for the Contract Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. The vendor accepts all of the terms and conditions of this RFQ and Instructions to Vendors. This RFQ will remain subject to acceptance for 90 days after the day of RFQ opening. The Proposer agrees to sign and submit the Agreement with other documents required by the Bidding Requirements within ten days after the date of the City’s Notice of Award. In submitting this RFQ, the Vendor represents, as more fully set forth in the Agreement, that: The Vendor has familiarized himself/herself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Law and Regulations that in any manner may affect cost, progress, performance, or furnishing of the Work. The Vendor has given the City written notice of all conflicts, errors, discrepancies that it has discovered in the Contract Documents and the written resolution thereof by City is acceptable to the Vendor. This RFQ is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation; the vendor has not directly or indirectly induced or solicited any other Vendor to submit a false or sham RFP; the vendor has not solicited or induced any person, firm or corporation to refrain from Bidding; and vendor has not sought by collusion to obtain for itself any advantage over any other Vendor or over the City. The Proposer understands and agrees that the Bid is for unit prices to furnish and install individual Work Items for maintenance and/or repair work, complete in place. Estimates are provided for the purposes of Bid Evaluation and to establish unit prices for individual Work to be contracted by the City under individual Purchase Orders, based on the unit prices established under this RFQ. The City and the successful Proposer will establish completion times for each individual Work Item and the successful Proposer agrees that the work will be completed within the time frames agreed upon and stipulated in the individual Purchase Orders and/or Notice to Proceed. Page 7Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA City of Sunny Isles Beach | Firm Name: _____________________________________________________________________________ Street Address: _____________________________________________________________________________ Mailing Address (if different): _____________________________________________________________________________ Telephone No. _______________________________ Fax No. _________________________ Email Address: _______________________________ FEIN No. __/__-__/__/__/__/__/__/__ *“By signing this document the bidder agrees to all Terms and conditions of this Request for Qualifications. Signature: __________________________________________________________________ (Signature of authorized agent) Print Name: ____________________________________ Title: _________________________________________ THE EXECUTION OF THIS FORM CONSTITUTES THE UNEQUIVOCAL OFFER OF PROPOSER TO BE BOUND BY THE TERMS OF ITS PROPOSAL. FAILURE TO SIGN THIS SOLICITATION WHERE INDICATED ABOVE BY AN AUTHORIZED REPRESENTATIVE SHALL RENDER THE PROPOSAL NON- RESPONSIVE. THE CITY MAY, HOWEVER, IN ITS SOLE DISCRETION, ACCEPT ANY PROPOSAL THAT INCLUDES AN EXECUTED DOCUMENT WHICH UNEQUIVOCALLY BINDS THE PROPOSER TO THE TERMS OF ITS OFFER. Miller Legg 1845 NW 112th Avenue, Suite 211, Miami, FL 33172 Same as above 305.599.6381 954.493.6539 mkroll@millerlegg.com 6 5 0 5 6 3 4 6 7 Michael D. Kroll, RLA, FASLA President 1. Cover Page Page 82. Table of Contents Page 9Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 2. Table of Contents Tab Page 1 Cover Page 5-7 2 Table of Contents 9 3 Minimum Qualification Requirements 11-24 4 Evaluation Criteria 26-94 Firm Qualifications and Experience 26 Qualification of Key Personnel Assigned to Engagement 39 Project Approach 85 Florida Statute 287.055 Certified Minority Business Enterprise Certification 93 Past Performance - References 94 5 Contract Forms 96 6 Exceptions 108 CONTINUING SERVICES FOR LANDSCAPE ARCHITECTURAL SERVICES CCNA RFQ No. 22-06-01 Miller Legg Proposal 22-P0228 Relevant to you: Miller Legg delivered the award winning Pelican Community Park. Page 103. Minimum qualifications requirements Page 11Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 3. Minimum Qualifications Requirements a. State of Florida Registered Landscape Architect Miller Legg meets the minimum qualifications requirements for a proposer to be deemed responsive by the City. a. Miller Legg was established in 1965 and has been offering landscape architecture, civil engineering, surveying and environmental services to both public and private clients. Miller Legg is active with the Florida Department of State, Division of Corporation. Our document number is P95000021117. Page 12Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 3. Minimum Qualification Requirements - Licenses Page 13Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 3. Minimum Qualification Requirements - Licenses Page 14Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 3. Minimum Qualification Requirements - Insurance Page 15Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 3. Minimum Qualification Requirements b. Government Contracts b. Miller Legg has been awarded numerous projects, as a prime and subconsultant, within the past five years as illustrated below: • City of West Palm Beach Gregory Road Green Streets LID Sanitary Sewer & Stormwater • Town of Lauderdale-By-the-Sea Poinciana/ Bougainvillea Roadway and Parking Improvements • City of Miami Hadley Park Synthetic Turf and Park Improvements • City of Miami Morningside Tennis Center • City of Palm Beach Gardens Tennis Center • City of Miami Beach 20 Street & Sunset Drive Pocket Park • City of Homestead Biscayne-Everglades Greenway Trail • City of Tamarac Go-Forward Roadway Landscape Master Plan Update • City of Miami Gardens Rolling Oaks Regional Park • City of Coral Springs Tree and Landscape Inspections • City of Miami Beach Chase Avenue and 34 Street Shared Path • Orlando VA Healthcare System Medical Center Facility Master Plan • Town of Davie Governor Leroy Collins Farm Park • City of Fort Lauderdale Las Olas Streetscape Design • City of Miami E.G. Sewell Park • City of Dania Beach Southeast Drainage Improvements Phase 2 • City of Tamarac University Drive Landscaping Improvements • Broward County Sheriff’s Office New Training Center Garage Design/Build • Miami-Dade County Parks, Recreation & Open Space Greynolds Park Playground Design • City of Delray Beach Pompey Park Community Center and Campus Design • City of Miami La Pastorita Neighborhood Roadway Improvements Study • City of Boca Raton Police Services Department • City of Weston Community Center • Veterans Administration Florida National Cemetery Phase 5 Design Build • City of Port St. Lucie Landscape Architect-Arborist for GPS Landscaping & Signs Inventory • City of Oakland Park East Dog Park • City of Miami Fairlawn Community Park • Miami Beach Ballet and Workforce Housing • Town of Davie New Town Hall Engineering Design Criteria Package • City of Tamarac Commercial Boulevard Landscaping Improvements • United States Department of Veterans Affairs South Florida National Cemetery Phase 2 Design- Build • Broward County South New Regional Courthouse Pre-Design Phase • City of Hallandale Beach Atlantic Shores Boulevard from US-1 / Federal Highway to Diplomat Parkway • Palm Beach County Homeless Resource Center 2 • City of Miami Armbrister Park Community Center • City of South Miami Sunset Drive Roadway and Beautification Improvements • Miami-Dade County Water and Sewer Department E15-WASD-02 Pump Station 0051 • Lake County CR 437 Realignment and Roundabout • FDOT District 1 à 1 SR 789/Ringling Minor Bridges PD&E from Bird Key Drive to Sarasota Harbor West #CA662 SR 31 at CR 74 Roundabout in Charlotte County #CA734 à SR 572/Drane Field Road Roundabout at Waring Road #CA900 à Fowler Street at SR 884/Colonial Boulevard Intersection Improvements #CA668 • FDOT District 3 à SR 79 at SR 8/I-10 Landscape Holmes County à SR 30A/US 98/Panama City Beach Parkway Multilaning from Mandy Lane to East of Nautilus in Bay County à SR 281 Berm Landscaping Drainage Pond in Santa Rosa County • FDOT District 4 à EB SR 84 to SB SR 93/I-75 On-Ramp Interchange #C9W57 à Sidewalk Design for SW 148 Avenue (Miramar) & Lakeside Neighborhood Sidewalks and Roundabout (Oakland Park) #CA576 à SR 802/Lake Worth Road Roundabout Pedestrian Improvements à BDI D/W Plans Review /Support Services #CA278 FDOT District 4 SR 9/I-95 from S of 45 Street to N of 45 Street Diverging Diamond Interchange (DDI) #CAA01 à Port St. Lucie Boulevard from Becker Road to Paar Drive #CA885 à D/B I-95 3C Express Lanes from Stirling Road to Broward Boulevard including I-595 from SR 441 to I-95 Page 16Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 3. Minimum Qualification Requirements b. Government Contracts à SR 804/Boynton Beach Boulevard Various Locations CAC93 à SR-9/I-95 at Lantana Road Diverging Diamond Interchange (DDI) à SR 5/US 1 from N of SR 70/Virginia Avenue to N of Avenue O Resurfacing à SR A1A from Broward County Line to SE 3 Street in Boca Raton à SR A1A from Lake Avenue to Ibis Way and SR 816/Oakland Park Boulevard from Rock Island Road to East of NW 31 Street Resurfacing à SR 5/US 1 from NE 17 Way to NE 33 Court • FDOT District 5 à SR 46 from US 17/92 (MP0.010) to Mellonville Avenue (MP 1.022) in Seminole County à SR 25/SR 500 from North of Griffin Road to South of Martin Luther King Jr. Boulevard in Lake County #CA654 à SR 527 from Clay Avenue to S Orlando Avenue and Roundabout CAD41 à I-4 at SR 429/Western Beltway Auxiliary Lanes, Ramp Improvements and Resurfacing #CA415 à SR 25/SR 200/US 301/US 441 from CR 25A to US 301/US 441 Interchange Resurfacing • FDOT District 6 à SR 5 / US 1 / S Dixie Hwy from N of SW 80 Street to S of Riviera Drive #CA945 à SR 847/NW 47 Avenue Post Design à SR 5/US 1 from SW 336 Street to SW 304 Street à SR 826/Palmetto FEC Crossing @ 154 Street (Hialeah) Post Design à D&E SR 994/SW 200 Street/Quail Roost Drive à Florida Keys Post Hurricane Irma Landscape & Tree Assessments à SR 5/US 1 at SW 137 Avenue Contract #CAG29 à SR 9336/SW 344 St/Palm Drive from SW 192 Avenue to W of SR 5/US 1 à SR A1A/Collins Avenue from N of 26 Street to 44 Street/Indian Creek Drive #CAA06 à Pedestrian Bridge over SR 90/SW 8 Street and C-4 Canal at SW 109 Avenue Contract #CAC84 à I-75 from NW 178 Street to NW 202 Street Landscape • FDOT District 7 à E7R10 D/B Howard Frankland Northbound Bridge Replacement (I-275) • Florida Turnpike Enterprise à SR 417/Seminole Expressway Resurfacing from Orange/Seminole County Line to South of Lake Jesup Bridge MP 38-44.5 à SR 91/Mainline at Sample Road NB Off-Ramp Improvements #C9U40-4 à Snapper Creek Service Plaza General Improvements MP 19 #CAA40 à SR 54 Operational Ramp Improvements (SR 589) Interchange (MP 0.19) #CAA03 à SR 91/Mainline MP 265.3 - MP 269.4 Orange County Resurfacing and Safety Upgrades #CA527 à D/B Polk Parkway Widen & Resurface MP 18.028 to 22.286 in Polk Cty #E8R82 à SR 417/Seminole Expressway Resurfacing from S of Lake Jesup Bridge to N of CR 427/Lake Mary Boulevard Interchange MP 44.5-49.9 #CA708 • School District of Palm Beach County Pine Grove Elementary School Modernization • Florida International University à Felsberg Veterans Memorial Plaza à Josh Richardson Memorial Plaza à Alexa Duran Memorial à Parkview Housing Promenade and Plaza à Parking Garage 3 West Side Exit à Biscayne Bay Campus Lift Station à 107 Avenue Parking Signage à Parking Garage 2 South Side Exit à Green Library North Wellness Walkway à Parkview Housing Phase 2 • Miami Dade College à InterAmerican Campus 7 Street Closure Traffic Study à Kendall Makers Lab à North Campus Roadway Assessment • Broward College South Campus B-99 Aviation Hangar Addition Design Criteria • Nicklaus Children’s Hospital CCBT Plaza • Jackson South Medical Center Garage & Site Improvements Design Criteria Package • Joe DiMaggio Children’s Hospital Expansion Page 17Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 3. Minimum Qualification Requirements b. Government Contracts City of Miami Beach 20th Street & Sunset Drive Pocket Park Miami Beach, FL Miami Beach needed a small park for the community to use while a nearby park was being redesigned. Ultimately it would serve the adjacent community and provide a public art component. Some challenges that arose: • The City never provided playground equipment. • The City added an artist and coordination with the artist to our task. • The concepts were accepted and then requested for additional revisions beyond the scope. • Water table was an issue because the City never provided the contractor with the geotechnical report. • Footers for support post were poured in the wrong locations. • Initially the design was to provide sheet flow to existing drainage structures. Per City review we had to retain water on site for 100 year flood capacity. To meet the goals of the project, we provided the play components of the park as the art pieces. We had to redesign the park to fit within the confines of the erroneously poured support pole footers. The addition of berms to retain water on site were created and the play area raised above anticipated water retention levels. Some creative thinking of having the playground/play equipment be the art pieces was quite inventive. Adjusting the design for the misplaced footer design, and redesigning the site to hold 100 year flood water levels, were logical solutions. The final product was a great park that the City was proud of. They saw our creativity and ability to adapt to a changing scope. They got the best of our work at a minimal cost. The City recently provided us with a new project, showing that they trust in our ability to adapt and deliver a quality product in a timely manner. In the end we were able to recoup a small portion of time we put into the project but some cost savings were provided through the “art pieces” play equipment, instead of using traditional play equipment. Start / Finish Date: 04/18 - 02/20 Page 18Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 3. Minimum Qualification Requirements b. Government Contracts Miami-Dade County Parks, Recreation & Open Space (PROS) Equitable Distribution Program Continuous Professional Services Agreement Miami-Dade County, FL The following park projects have been performed under Miller Legg’s Continuing Services Contract with PROS: Debbie Curtin Interactive Park Responsible for development of the conceptual rendering plans and construction document for this exciting interactive park. Features of the interactive components include a drums metallophones, chimes, bongo, hourglass and ring-a-bell panels, as well as a custom rope climber, and a global motion freestanding play structure. Sabal Chase Park Playground Provided design, construction plans, permitting and construction administration for a new small tot lot playground at Sabal Chase Park in Miami. Included is the installation of new trees, sod, and butterfly-inspired plant material as well as the restoration of all areas, including walkways and lawns. South Dade Park Provided survey/SUE, design, construction plans, permitting and construction administration for a new small tot lot playground. Included is the installation of new trees, sod, and butterfly- inspired plant material as well as the restoration of all areas, including walkways and lawns. Devon-Aire Park Provided survey/SUE, design, construction plans, permitting and construction administration for a new shelter and connecting walkways. Also included is the relocation of trees and the restoration of all areas, including walkways and lawns. Greynolds Park Playground Design Retained to provide topographic and tree surveys, SUE services, civil engineering, and landscape architecture services. Program includes ADA compliant sidewalk, demolition of existing playground and construction of a new playground that meets nature play criteria set forth by PROS. Educational and historic signage will be designed and added to the playground area. Start / Finish Date: 08/16 - Ongoing Page 19Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 3. Minimum Qualification Requirements b. Government Contracts City of Tamarac Go-Forward Roadway Landscape Master Plan Update Tamarac, FL City of Tamarac Commercial Boulevard Landscaping Improvements Tamarac, FL Miller Legg provided the City of Tamarac with an update to its citywide Roadway Landscape Master Plan. The project consisted of creating a go-forward landscape roadmap guide that will be implemented for years to come. Miller Legg conducted a citywide tree inventory assessment, an evaluation of existing landscape, irrigation and hardscape conditions, an overall assessment of the existing character of the road corridors, and an opportunities and constraints analysis. The overall goal was to create a Landscape Master Plan that provides the City with typical conceptual landscape concepts, recommendations, guidelines, and implementation strategies to follow. The Master Plan was unanimously adopted by the City Commission. Start / Finish Date: 02/19 - 05/20 The City of Tamarac engaged Miller Legg to provide landscape architectural and survey services for the existing medians along 1.70 miles of West Commercial Blvd in Broward County between North Pine Island Road and Sawgrass Expressway. In addition to landscape architecture, a certified arborist report and survey (including vacuum excavations) services, the Miller Legg team provided lighting and electrical services, irrigation design, permitting, and construction administrative services. Coordination efforts with multiple agencies, such as the Florida Turnpike Authority (FTE) and the South Florida Water Management District (SFWMD), is included in the project scope. Specific services for these roadway improvements entailed providing a specific purpose survey showing only above-ground improvements, compiling a 30% conceptual landscape and lighting plan, and providing 100% construction documents for irrigation, landscape, hardscape, lighting and electrical, and an arborist assessment. Start / Finish Date: 12/20 - 06/22 (est) Page 20Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 3. Minimum Qualification Requirements b. Government Contracts City of Oakland Park East Dog Park Oakland Park, FL City of Oakland Park NW 21st Avenue Streetscape Oakland Park, FL To assist with the City of Oakland Park’s plan to develop a 1-acre Dog Park at the existing Richard Giusti Heart Par Cours Park, Miller Legg was retained for topographic and tree surveying, SUE, engineering and landscape architecture services as well as an opinion of probable cost. The firm is providing schematic designs to include layout, existing/proposed trees and shrubs, fencing, benches, site amenities, water station, parking layout and pathway location. Start / Finish Date: 03/20 - Ongoing Under the firm’s Continuing Services Contract, Miller Legg prepared an aerial conceptual plan and typical sections for streetscape improvements within the right-of-way along NW 21st Avenue between Oakland Park Boulevard and NW 26th Street. The conceptual design included a conversion of a continuous median into multiple landscaped medians. The proposed medians work towards the continued beautification of the corridor. The project also focuses on connectivity and safety for pedestrians and bicyclists. It extends the existing bike lane and adds visible pavement markings that promote safety on the street, at driveways, and at intersection crossings. Start / Finish Date: 05/19 - 07/19 City of Oakland Park Lakeside Sidewalks Oakland Park, FL The City of Oakland Park was evaluating the addition of sidewalks within the Lakeside community to improve pedestrian connectivity as part of its Complete Streets program. As part of the documentation required for CSLIP grant applications, Miller Legg provided a conceptual aerial overlay plan and a typical cross-section illustrating the proposed 5 ft. sidewalks along the right-of-way for specific road segments within Lakeside. Start / Finish Date: 08/17 - Ongoing Page 21Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 3. Minimum Qualification Requirements b. Government Contracts City of Oakland Park Safe Routes to Schools Oakland Park, FL City of Oakland Park Parks & Recreation Master Plan Update Oakland Park, FL City of Oakland Park Parks & Recreation Master Plan Oakland Park, FL Miller Legg was retained to assist the City of Oakland Park in preparing documents required for the Safe Routes to School (SRTS) grant program for the Lloyd Estates Elementary School Sidewalk Improvements project. The Safe Routes to School grant funding is administered by FDOT. Miller Legg conducted public outreach with the local community as part of preparing its walkability assessment. The firm’s report to the City included a concept plan, typical cross-section and walkability memorandum. Start / Finish Date: 11/18 - 01/19 Having prepared the original Recreation and Parks Master Plan for the City of Oakland Park in 2009, Miller Legg was retained by the City in 2015 to update this Plan. The scope of services involved site analyses of each park and community center, a recreational programming needs assessment based upon the current and anticipated City population, a proposed implementation plan with recommendations for recreational improvements including cost estimates and the application of updated census data to a map and exhibits format for comparison with the original Master Plan. Start / Finish Date: 8/17 - 11/18 Miller Legg was retained to assist the City of Oakland Park in preparing documents required for the Safe Routes to School (SRTS) grant program for the Lloyd Estates Elementary School Sidewalk Improvements project. The Safe Routes to School grant funding is administered by FDOT. Miller Legg conducted public outreach with the local community as part of preparing its walkability assessment. The firm’s report to the City included a concept plan, typical cross-section and walkability memorandum. Start / Finish Date: 03/08 - 12/09 Page 22Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 3. Minimum Qualification Requirements b. Government Contracts City of Miami Morningside Tennis Center Miami, FL The City of Miami Morningside Park created an expanded and improved tennis facility at this 42-acre Park. The project included improvements to an existing seven (7) courts that had experienced degradation due to drainage and soil stabilization issues. A new court layout was developed to increase the facility to eight (8) lighted courts and a warm-up training wall amenity. Other tennis improvements included upgraded lighting, fencing and shaded bench area. A central courtyard was also developed as a key element of the project design. This courtyard creates an inviting area for players and spectators to gather before and after matches. A themed paver field with lush landscaping that embraces large existing ficus trees creates a pleasant gathering space not previously found at Morningside Park, and helps establish it as a premier public tennis destination in the City of Miami. Miller Legg services included civil engineering, landscape architecture, arborist, permitting and limited construction administration to assist the City in the bidding, observation and certification of the project improvements. Arborist services included evaluating existing trees for health, longevity and relocation prospects. Once relocated, the trees were monitored for ongoing wellbeing on site. Apart from the City, other agencies with jurisdiction for this project include Miami-Dade County Department of Environmental Resources (DERM) and South Florida Water Management District (SFWMD). Received the Facility Showcase award by the Florida Recreation & Park Association. Miller Legg secured this project under the firm’s Continuing Services Agreement with the City of Miami. Start / Finish Date: 07/15 - 12/18 Page 23Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 3. Minimum Qualification Requirements b. Government Contracts City of Lauderhill Sports Park Lauderhill, FL Town of Lauderdale-By-the-Sea Poinciana/Bougainvillea Roadway and Parking Improvements Town of Lauderdale-By-the-Sea, FL Miller Legg was retained by the City of Lauderhill to provide landscape architecture, irrigation design, civil engineering design, stormwater permitting, construction specifications and bidding assistance services for proposed amenities improvements at the 12-acre Lauderhill Sports Park. Replacement of the baseball field and cricket pitch natural grass with synthetic turf and the football scoreboard replacement tasks have been finalized. Miller Legg has also completed design of the playground area wood chip surface conversion to synthetic turf, playground shade, modifications to portions of the fitness trail and the addition of new fitness stations trail and exercise equipment. Start / Finish Date: 03/17 - 01/19 Under the firm’s Continuing Services Contract, Miller Legg provided design and permitting services for parking, roadway and landscape architectural improvements for the Poinciana Street and Bougainvillea Drive area north of Commercial Boulevard to alleviate congestion along the parallel corridor of SR A1A in the Town of Lauderdale-By-The-Sea. Services included: roadway and parking area design, signing and pavement marking, lighting, utility coordination, permitting, landscape, hardscape and irrigation, and pre- and post-construction observation services. Start / Finish Date: 06/17 - 01/19 Relevant to You: Community Outreach / Interactive Webpage: Miller Legg can coordinate with the City to organize a page within the City’s existing website to assist in data gathering and dissemination of project information. Other social media outlets (Facebook, Instagram, Twitter, etc.) are also effective tools utilized for keeping the public involved in and informed about the process. Page 24Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 3. Minimum Qualification Requirements c. References City of Tamarac | Roadway Landscape Master Plan Robert Johnson City Planner 7525 NW 88th Avenue Tamarac, FL 33321 Robert.Johnson@tamarac.org 954.597.3533 City of Oakland Park | East Dog Park Sierra Marrero Assistant Director of Engineering and Building Services 5399 N. Dixie Highway, Suite 3 Oakland Park, FL 33334 sierra.marrero@oaklandparkfl.gov 954.630.4479 Miami-Dade County Parks, Recreation & Open Space (PROS) | Equitable Distribution Program Continuous Professional Services Agreement Hong Yun, RLA, LEED AP Landscape Architect 275 NW 2nd Avenue, 4th Floor Miami, FL 33128 hongbum.yun@miamidade.gov 305.755.7922 Additional references for your consideration: Page 254. Evaluation Criteria Page 26Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 4.1 Firm Qualifications and Experience The overarching ‘Improving Communities. Creating Environments.’ tagline Miller Legg adopted many years ago informs the way we approach every project and is at the heart of all our corporate efforts. Our 57+-year- old firm has offices in Miami, Fort Lauderdale and Port St. Lucie. Client sectors include municipal and county government, transportation, healthcare, education, federal and international. This offers our clients a firm of seasoned professionals across multiple disciplines who are leaders in the Florida consulting industry. Our core landscape architecture and land planning services are outlined below, some of which have been used in Sunny Isles Beach projects. Landscape architecture services include planting, hardscape, irrigation, urban design, complete street design, recreational and commercial planning, project theming, signage design, graphic design, contract administration, construction observation services, plan review, horticultural consulting and arboriculture. In addition, the firm has inventoried more than 40,000 trees ranging from 28 to 20,000 trees per project. Our award- winning consulting firm has lived our tagline “Creating Environments, Improving Communities” in the delivery of landscape architecture, urban design and planning services for over 52 years. Through a collaborative, holistic approach, we develop memorable spaces that balance the needs of our communities with the respect and sustainability of our natural systems. Globally, our projects include parks and recreation facilities, streetscapes, community design greenways, mixed-use redevelopments, educational and healthcare facilities, urban revitalization, environmental habitat restoration, resorts and transportation facilities. With over 45 diverse design awards, our projects and the design process utilized to develop each sustainable solution have been recognized by our peers for their success. Planning services include: land planning, comprehensive planning, community planning, development plans review, CRA and redevelopment planning, landscape architecture, urban design, complete street visioning, parks and recreation planning and design, site planning design and processing, corridor and Development of Regional Impact (DRI) studies, Land Use Plan amendments, rezoning applications, concurrency studies, due diligence studies, community relations, grant writing assistance and applications, and plat preparation and processing. Miller Legg is a true multi-discipline consultant, offering the following additional services which are often required for the types of projects suggested in the RFQ scope of services: Civil engineering services include: utilities design and modeling (such as water and sanitary sewer design and permitting, pump station design, surface water management, drainage system design), utility coordination, traffic engineering, complete streets and highways design, street lighting design, pavement marking and signage design, parks and recreation design, master planning, municipal engineering, construction monitoring and full Construction Engineering Inspection (CEI) and management services. Surveying services include land surveying such as boundary, land title, route, right-of-way, platting, design and control, topographic, Subsurface Utility Engineering (SUE), as-built, tree, and hydrographic surveys, construction layout, Construction Engineering Inspection (CEI) surveys, field monumentation, sketches and descriptions for acquisitions and easements, and GPS data collection. In addition, we provide quantity (earthwork) surveys, condominium surveys, title document analysis, plot plans, and expert witness testimony. Miller Legg has completed surveys for numerous municipal, county, state and federal projects ranging from neighborhood improvement and redevelopment projects, educational facilities, neighborhood parks, and golf course designs to regional water and sewer utilities, streetscapes, streets and highways, and cemeteries. Environmental consulting services include habitat assessment and restoration planning, wetlands investigations and delineations, management plans, grant writing, jurisdictional determinations, threatened and endangered species assessments and permitting, environmental due diligence, National Pollution Page 27Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 4.1 Firm Qualifications and Experience Discharge Elimination System (NPDES) compliance, stream restoration and water quality monitoring and compliance. The firm also provides wildlife surveys, seagrass and coral reef surveys, mitigation feasibility studies, mitigation design, planning and construction observation, mitigation banking, value ecological engineering, cost evaluation and scheduling, environmental permit processing, mitigation monitoring and compliance, protected upland and tree permitting, ecosystem analysis, grant writing and floodplain analysis and re-evaluation. The firm has completed numerous municipal, county, state and federal projects ranging from neighborhood improvement and redevelopment projects, educational facilities site planning, cemeteries, neighborhood parks and golf course designs to aviation facilities, complete streets projects, regional water and sewer utilities, streetscapes, and streets and highways. Additionally, the firm has successfully completed several thousand private sector projects including residential developments from two to 7,000 acres, industrial and office sites, hotels and theme park facilities, marinas, golf courses, hospitals and medical office complexes, commercial properties, retail shopping centers and franchise properties. The firm has been involved with more than 200,000 acres of project design development in Florida. Our approach to each project is best characterized by a “partnering relationship”. We dedicate ourselves to learning the culture of our clients, and their specific concerns, desires and needs, much like an extension of their own offices. We consistently strive to maintain time schedules and to provide factual and frequent communication. Miller Legg prides itself on its Team approach to the interdisciplinary needs unique to the project and client. We provide responsive, personalized, quality service to value-conscious private clients and select government agencies, who desire the very best in planning and design. Stability Financial stability is achieved by applying successful strategies over time and being adaptable to changing markets and economies. Miller Legg has been in operation for 57+ years. The firm is geographically diverse and has strength and expertise in numerous market sectors, including municipal markets. We have established a stable workforce of highly-regarded and well-qualified, licensed professionals, technical and support staff on whom we can depend to provide Miller Legg’s project deliverables to our clients. Together, these factors have established and continue to safeguard the company’s financial stability and success, ensuring our capability to provide the resources required of this City of Sunny Isles Beach contract. Representative awards for projects which included Landscape Architecture Services GENERAL AWARDS & RECOGNITIONS: • Sun-Sentinel, Top Workplaces, 2016-2021 • ENR Southeast Regional Top Firms List, 2021 • Landscape Architect & Specifier News, Florida Firms and Projects Features, 2019, 2020, 2021 • Southeast Construction Magazine, Southeast’s Top Designers List, 2005-2010 • Zweig White Hot Firms List, Top 200 Fastest Growing A/E and Environmental Consulting Firms, 2007 PROJECT SPECIFIC AWARDS: Plantation Preserve & Golf Club • Florida Chapter of the American Society of Landscape Architects, Outstanding Design Award, 2012 • Florida Nursery, Growers and Landscape Association, Award of Excellence, 2009 AWARD WINNING PROJECTS Page 28Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 4.1 Firm Qualifications and Experience Sunny Isles Beach Pelican Community Park • American Society of Landscape Architects, Florida Chapter, Award of Merit, 2009 FDOT District 6 Biscayne Boulevard (NE 5th Street to NE 13th Street) • Florida Section of the American Society of Landscape Architects, Outstanding Project Honor Award, 2011 City of Coconut Creek Sample Road Streetscape • Broward County Broward Beautiful, Third Place for Roadway / Swale Beautification, 2004 Florida International University (FIU) US Century Bank Arena Plaza • American Institute of Architects, State of Florida AIA Merit Design Award, 2012 We have consistently proven to our clients, including the City of Sunny Isles Beach, our aptitude for delivering assignments on time (often expedited) and within budget by dedicating appropriate resources, technology and equipment. 85% of our client base is repeat clients and this retention rate is evidence of the trust placed in us to work smart and to plan in order to successfully manage each assignment. The client references in this submittal bear out this level of commitment and the following sample comments from current and past clients in the past 5 years illustrate the trust they place in Miller Legg to successfully deliver on their projects. “I found their staff to be proficient, responsive, knowledgeable and supportive of our combined efforts. Miller Legg’s guidance and persistence made for a truly collaborative endeavor.” City of Plantation First Parks & Recreation Master Plan Patricia O’Toole Parks and Recreation Assistant Director “Mr. Kroll and his team were always just a phone call away, ready to serve and resolve any design challenges thrown their way.” City of Coral Gables War Memorial Youth Center Athletic Fields Javier Torres Principal, MC Harry Architects (Prime) CLIENT RECOGNITION FOR SIMILAR PROJECTS Page 29Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 4.1 Firm Qualifications and Experience “Miller Legg’s past experience with this complex process was the reason we selected the firm for the project and their diligence, expertise and patience throughout was extremely helpful.” City of South Miami First Parks & Recreation Master Plan Quentin Pough, CPRP Director of Parks and Recreation “Miller Legg staff has always demonstrated quality technical and management skills and they ensure they fully understand our projects in order to meet our requirements and needs” School Board of Broward County Office of Facilities and Construction Divine Amoah Architectural Engineering Manager “Their staff expertise and professionalism have been remarkable and I am extremely satisfied with the result” City of Miami Baywalk Phase 3 Capital Improvements Program John DePazos Sr. Project Manager “The staff demonstrate a wealth of technical expertise and develop practical solutions to project challenges” City of Pembroke Pines Foxcroft Wetland Mitigation Area George Wrves Project Manager “Miller Legg is thoroughly professional, responsive, communicative and technically skilled” City of Doral Glades Park Barbara Hernandez (former) Parks and Recreation Director “They have approached their work with sensitivity and enthusiasm, presenting solutions to scope and permitting challenges while adhering to the project budget and timetable” City of Homestead Biscayne Everglades Greenway Pedro Reynaldos Director of Parks & Recreation ”I have found the staff to be very competent, proactive and timely with task completion. They manage assignments extremely diligently and have been very helpful in accommodating some last-minute inspection requests.” City of Coral Springs Continuing Landscape Architecture and Landscape Inspection Services Claudia Alzate Coral Springs Arbor & Horticulture Manager Public Works Department “Their professional staff were well-versed with Broward County’s rules and regulations for surface water management.” City of Lauderhill Lauderhill Sports Park J. Martin Cala DEES Director/City Engineer “The project went very smoothly and the client was very happy with the final product” City of Miramar Forzano Park Improvements Juan Vasquez Vice President RJ Behar (Prime) “The staff at Miller Legg have been amazing to work with. The team is very professional and timely with all requests.” City of Tamarac East Side Parks Feasibility Study Linda Probert Parks & Recreation Assistant Director “We highly recommend Miller Legg.” Boca Raton Beach and Parks District Red Reef Park Master Plan Update Arthur Koski Executive Director “Miller Legg provided excellent landscape design services at short notice, coordinating very well with the City of Fort Lauderdale. They have been very responsive during design and post-design services of this Neighborhood Enhancement project”. FDOT District 4 Fort Lauderdale Sistrunk Pedestrian Enhancements Amin Ahmed Project Manager Stanley Consultants (Prime) “This was a high priority project that had to be completed in time for a major event. Miller Legg provided outstanding service throughout all phases to assist us in meeting our deadline with a quality product.” Broward College Bailey Hall Landscape Improvements William Gallo, AIA Vice President Gallo Herbert Page 30Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 4.1 Firm Qualifications and Experience In addition……. Miller Legg currently holds over 40 public sector continuing services contracts, a testament to the satisfaction of the clients in our ability to ensure our project deliverables are completed efficiently and responsibly and to the satisfaction of the owners. Having reviewed the list of possible scope elements for potential projects under this City of Sunny Isles Beach Continuing Services Contract, Miller Legg is privileged to be able to offer a project portfolio showcasing these very scope items. Examples of our projects can be seen throughout our submittal, in resumes, project sheets and reference project sheets. A broad sampling of service components and projects is offered below: Tree Surveying: Our arborists have provided tree surveying for the following projects located in Miami- Dade County: City of Coral Gables Sunrise Harbor Surveying, City of Doral Central Park, City of Miami Armbrister Park Community Center, Florida International University Parkview Housing Phase 2, Florida International University Trish & Dan Bell Chapel and East Loop Road Realignment, Miami Art Museum, Miami Science Museum, Miami-Dade County PROS Greynolds Park Playground Design, SFWMD Allapattah Flats/ Comprehensive Everglades Restoration Project (CERP). RER Tree Removal Permitting: Our arborist and landscape architecture staff have coordinated this permitting for the following example projects located in Miami- Dade County such as City of South Miami Sunset Drive Beautification, Nicklaus Children’s Hospital Tomotherapy Building Site Design, Miami Dade College Kendall Classroom and Student Services Building, City of Miami Buena Vista Heights Landscaping, Irrigation Design, Operation and Maintenance: Our irrigation designers have provided these services for the following projects in Miami-Dade County among others: FIU Engineering Building BT 919, FIU Green Library Walkway, FDOT 6 Design/Build I-395 Bridge/SR 836 & I-95, Miami Beach 19th Street Stormwater Pump Station and Botanical Gardens, Coral Gables War Memorial Youth Center Fields, Miami Dade County Aviation Department Opa-locka Executive Airport Beautification, Victoria Park Design. Median and/or Swale Landscaping Design: Examples of this type of work performed by our professional staff include the following -FDOT District 6 SR 9336/SW 344 St/Palm Dr from SW 192 Avenue to W of SR 5/US 1, City of Hallandale Beach Atlantic Shores Blvd., City of Tamarac Commercial Boulevard Landscaping, Coral Springs Tree and Landscaping Inspections, City of Oakland Park 21st Avenue Streetscape, City of Plantation Preserve and Golf Club, Miami-Dade Aviation Department Central Blvd Landscape Master Plan, City of Coconut Creek Sample Road Streetscape. Landscape Maintenance Service Inspections: Miller Legg has handled a myriad of projects which have included this service in the scope, such as FDOT District 6 SR 25 / Okeechobee Road and HEFT, FDOT District 6 SR 826 @SW8th Street LA Inspections, FDOT D6 Three BOLD Corridors in Miami, Florida Atlantic University Habitat Management, City of Coral Springs Landscape Inspections. Active and Passive Park Design: Our firm has been very fortunate to be selected to design a significant number of both active and passive parks in Florida and are currently engaged in park design and construction in Miami- Dade County, Broward Count and Palm Beach County. Examples of these projects are interspersed throughout our submittal. b. SIMILAR PROJECT SCOPE EXPERIECE Page 31Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 4.1 Firm Qualifications and Experience Feasibility Analysis: The firm have conducted various landscape and irrigation feasibility analyses as a typical part of municipal landscape architecture continuing services contracts and for FDOT (such as FDOT1 SR 31 at CR 74 Roundabout Intersection, FDOT Florida Turnpike SR 54 Exit Ramp at SR 589 Interchange). Attendance at meetings with City Staff and presentations to City Commission: The requirement to attend meetings with City Staff is a characteristic piece of the scope for most of our landscape architecture project contracts and one with which we have an abundance of experience. These can include meetings with other City departments, agencies or public meetings. We also are practiced in preparing and delivering presentations to City departments and Commission meetings for different types of projects. City of Sunny Isles Beach Pelican Community Park - A three-acre active park site, for which Miller Legg managed landscape architecture, irrigation, engineering, surveying and architecture designs for a baseball field, recreation building, playground structure, gymnasium, and related site amenities within the City of Sunny Isles Beach. The project management team at Miller Legg received recognition from the City for their involvement in the design completion of the park. In addition, Miller Legg provided construction observation services. In addition, we also provided grant assistance to secure a Florida Recreational Development Assistant Program (FRDAP) grant for $200,000. FRDAP is a competitive grant program that provides financial assistance to local governments for development or acquisition of land for public outdoor recreational purposes. Award of Merit, American Society of Landscape Architects, Florida Chapter, 2009 City of Miami Beach 20th Street & Sunset Drive Pocket Park - Under our Continuing Services Contract with the City of Miami Beach, Miller Legg was awarded an assignment to provide survey, civil, geotechnical, electrical, structural engineering and landscape architecture services for the design, permitting and construction of a new ADA-accessible .33-acre pocket park at 20th Street and Sunset Drive. The firm prepared a boundary and topographic survey, assisted with the planning of key program elements and performed schematic design, design development, construction document, bidding and construction tasks. The design incorporates Crime Prevention Through Environmental Design principles. Arborist and irrigation design services were also furnished for this project. City of Coral Gables War Memorial Youth Center -This City of Coral Gables 7-acre War Memorial Youth Center in Miami Dade County represents a living memorial to Coral Gables World War II veterans. The project includes improvements to the multi-purpose athletic fields. Miller Legg was responsible for the landscape architecture, civil engineering design and permitting of the improvement program. Specific improvements included athletic field drainage, re-sodding with Bermuda “Celebration” turf and irrigation design. The irrigation system ties into a non-potable well system. Drainage improvements consist of subsurface field improvements that integrate with the existing exfiltration and subsurface drainage systems. Additional services provided include: design development, final construction documents, and construction administration. City of Tamarac Roadway Landscape Master Plan Update: Miller Legg provided the City of Tamarac with an update to its citywide Roadway Landscape Master Page 32Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 4.1 Firm Qualifications and Experience Plan. The project consisted of creating a go-forward landscape roadmap guide that will be implemented for years to come. Miller Legg conducted a citywide tree inventory assessment, an evaluation of existing landscape, irrigation and hardscape conditions, an overall assessment of the existing character of the road corridors, and an opportunities and constraints analysis. The overall goal was to create a Landscape Master Plan that provides the City with typical conceptual landscape concepts, recommendations, guidelines, and implementation strategies to follow. The Master Plan was unanimously adopted by the City Commission. Miami-Dade County Parks, Recreation and Open Spaces (PROS) Projects – In the past 5 years alone, Miller Legg has performed LA and arborist services for a number of PROS parks projects, such as Greynolds Park Playground Design, Devon Aire Park, South Dade Park, Sabal Chase Park and Curtin Interactive Park. Kendall Soccer Park Turf Replacement as well as providing LA Support Services as an in-house consultant. Miller Legg has also performed a number of other services for PROS, including Surveying and SUE services under a continuing services contract (Underline Brickell Backyard, Kendall Soccer Park Turf Replacement, Oak Grove Park, Matheson Hammock Park) and environmental and civil services for projects such as the Biscayne Everglades Greenway Trail Segment D. Florida Department of Transportation District 6 Biscayne Boulevard - For three sections of the award- winning historic Biscayne Boulevard roadway in the City of Miami, Miller Legg prepared tree removal and relocation for current roadway construction, as well as future planting, hardscape, and site amenity documents. This project required coordination with the Miami Downtown Development Agency (DDA), collection of field data, documentation of the information in graphic and text formats, and coordination of the proposed improvements with local municipalities and community associations. This five-year Biscayne Boulevard revitalization project was part of a multi-year continuing service contract with FDOT District 6. The project was recognized by the Florida Chapter of the American Society of Landscape Architects for Outstanding Design. Multi-disciplinary firm: Miller Legg’s staff members routinely work together on a broad spectrum of projects, and typically on concurrent assignments. A fundamental benefit of our in-house multi-disciplinary environment is that it allows each department to gain first-hand knowledge of the important technical contribution of each other service area in successful project execution. We understand the importance of incorporating both the natural environment and engineered systems to maintain resources from the building level out to the broader landscape level. Our landscape architects enhance the natural setting by creating improved areas that mesh with instead of standing apart from the environment. Our environmental biologists work closely with our engineers and planes throughout project design to ensure critical site elements are preserved, while also identifying potential opportunities to showcase the natural environment. Arborist Services: Miller Legg has found that more and more clients are seeking arborist services in their project scopes. Miller Legg has responded to this demand and we now have four (4) ISA certified arborists on staff. c. UNIQUE SKILLS AND QUALIFICATIONS Page 33Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 4.1 Firm Qualifications and Experience Use of Silva Cells: Miller Legg has utilized silva cells in our designs for projects which involve sidewalk/pedestrian improvements where space is limited and trees are mature. These cells are a modular suspended pavement system that use soil to create forest-like conditions in the city, supporting large tree growth and providing powerful on-site stormwater management through absorption, evapotranspiration, and interception. CPTED (Crime Prevention Through Environmental Design): The basis of CPTED is that proper design and effective use of the built environment can reduce crime. All our park project designs utilize the principles and practices of CPTED to provide a safe recreational amenity for Park users and adjacent landowners. Through natural surveillance, access control, territorial reinforcement, and maintenance and management, the resulting environment will discourage or impede criminal behavior. The implementation of these principles, when considered early in the design process, does not increase costs and ultimately supports a safer community. Habitat Assessment / Restoration: With our in-house biological, environmental and engineering staff and a range of over 5,000 acres of habitat restoration projects, Miller Legg has an unsurpassed expertise with natural areas that are successfully integrated with passive recreational uses, resulting in award-winning projects. Some of these include City of Plantation Plantation Preserve, Pembroke Pines Preserve, and Broward County West Lake Park. This experience can provide environmental amenities along the existing lake that can not only enhance the recreational experience but also improve water quality and add educational opportunities. Sustainable Best Management Practices: Our landscape designs strive to incorporate sustainability to minimize the consuming effect on the environment. We integrate systems and materials that are cyclical in design and use and have a benign or positive effect on the environment, such as the use of native plants, xeriscaping, green building materials, among others. An emphasis on sustainable design, in combination with long-lasting products that positively affect the economic viability of a project, are not just good for the environment; they provide cost savings in the long run though reduced energy and water usage costs. Our firm has worked on numerous projects which incorporate advancing technology and concepts, ranging from pervious pavement, incorporation of bioswales and other filtration systems to create a treatment train concept that allows for stormwater to be stored, reused for irrigation or hydration of natural systems and natural filtration, with as much as possible recharge and reduction of discharge. Our landscape architects augment nature by designing landscape enhancements that blend with the environment. We work to identify the most effective and durable designs and to assess repair methods for existing structures. Evaluating both initial and periodic costs of different repair strategies can guide our Client in obtaining better overall value for its current maintenance dollars. Work done at an earlier stage will not only cost less, but will reduce the rate of deterioration, creating savings now and in the future. Miller Legg has designed dozens of active and passive park projects in South Florida, both urban and rural locations, which consider and include resiliency design elements. Major elements considered are plant selection as well as material selection. Our design Team focuses on the sustainability of parks projects. This begins with integrating any existing environmental resources and/or identifying environmental opportunities within proximity of a park. Integration of any native habitat, xeriscaping or existing desirable plant material into the design Page 34Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 4.1 Firm Qualifications and Experience can reduce the initial construction cost, as well as the long-term maintenance costs and efforts required for the park. The proper selection of plant material also provides for resiliency, allowing the project to endure rising sea levels, increased hurricane, and tropical storms, as well as adapt to increased salt air. In selecting resilient plants, we recommend native species because they are low maintenance, require less water, less fertilizer, are adapted to the local environment, and are capable of withstanding major storms and hurricanes. Understanding planting conditions is critical in selecting the right material for wet conditions, dry conditions, or plant material that can handle both. Our landscape architects and designers follow grades and standards as well as ASNI and ISA Guidelines to ensure plant material being installed is of the highest quality. Material selection is a similar process. Miller Legg landscape architects and designers recommend using certain types of metals such as aluminum close to coastal areas to resist rust, using pervious/porous concrete to allow natural drainage to continue through the soil, and using polymer/wood blends to meet aesthetic requirements with maintenance/longevity requirements. We work to identify the most effective and durable designs, evaluating the initial cost of enhancements such as concrete quality, admixtures and corrosion protection, balanced against future maintenance expenses. These principles have been implemented in such diverse design projects as: Doral Glades Park, Biscayne Everglades Greenway Trail, Broward County Long Key Habitat Restoration, Miramar Pineland Nature Center Design/Build, Tradewinds Park Equestrian Trails, Miami Baywalk Phase 3, Coral Springs Red Lichen Sanctuary, FIU Bird Basin Land Management, Miami Dade Expressway Authority Design/Build Central Boulevard and FIU International Center for Tropical Botany. Permitting Excellence: Miller Legg has permitted a significant number of similar projects throughout the state and are very familiar with infrastructure improvements and environmental regulations that will apply to this project. Our experience serves to streamline the design and permitting process and allow for a fluid transition from design to construction, while avoiding delays in the overall project schedule. We actively follow the agency reviews and prompt these bodies for comments and issuance of the permits. Upon issuance, we implement our tracking summary sheet that is used to view the permit status and expiration dates for the project. We streamline the design and permitting process and allow for a fluid transition from design to construction, while avoiding delays in the overall project schedule. We have an impeccable record of no violations of federal, state, or local law or regulations. Communication: Through our many projects we have learned not to be passive. We have found it is important to engage the local utilities companies, local municipalities, and have great communication. This will ensure each project has minimal conflicts during design and construction. Again, in addition to great communication, our landscape analysis and opportunity plans ensure the final landscape and Irrigation design is functional, aesthetic, and low maintenance. We have also learned to look for innovative ideas that will help simplify, beautify, and increase the longevity of the landscape on FDOT projects. Cost Estimating and Control: Our substantive prior experience working with a variety of municipalities including Sunny Isles Beach, has enabled us to develop quality, sustainable designs within budgetary constraints. We can provide the City with unmatched planning and design efforts required for any project that might be assigned under this Contract. Our Principal-in-Charge, Michael Kroll, RLA, FASLA, ensures that our Team has the resources available to complete the City’s projects on time and within your established construction budgets. Miller Legg fully appreciates the budget challenges posed by the COVID 19 economic downturn. The financial impact on improvement programs will result in curtailment or possible cancellation of some planned projects. Our firm is no stranger to this new environment, having successfully consulted with many municipalities during previous difficult economic periods. Miller Legg d. COST CONTROL, QUALITY CONTROL, PROJECT COORDINATION WITH SUBCONSULTANTS AND CITY Page 35Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 4.1 Firm Qualifications and Experience knows how to expertly manage municipal projects with very tight budgets and deadlines and we will direct our project Team accordingly in partnership with the City of Sunny Isles Beach Project Manager. Our firm utilizes the following tried and true methods for ensuring that our designs remain within the established budget: • First, we uphold the project budget through strict observance of the schedule and our quality assurance program because we know design flaws and delays result in construction cost overruns. • Second, we complete a preliminary construction cost estimate at every submittal to ensure our design is within the cost requirements or to determine whether value engineering alternatives can be incorporated without impacting the purpose set forth by the Project Manager. • Third, changes in scope or design direction will be discussed with the Project Manager to ensure that everyone understands the ramifications of that change on the construction cost budget. This attention to detail in our processes is the core of Miller Legg’s cost control efforts. Constructability reviews and a realistic understanding of the time needed for construction completion help us to guide our clients to detail these constraints in the contract documents. This ensures either that the construction schedule is pragmatic and can be accomplished without incurring acceleration costs, or that these acceleration costs have been anticipated in the cost estimates where the need for expedited construction outweighs the higher costs associated. • Finally, contractor-initiated value engineering options are thoroughly reviewed and discussed with our clients. It is critical to ensure that the quality and functionality of the project is not sacrificed to these requested changes and that consequential changes such as permit modifications are factored into a value engineering proposal to fully assess the benefits and potential pitfalls if the proposal is accepted. Client Satisfaction And Complaint Resolution: Miller Legg’s hands-on project management approach will ensure transparent and regular communication among Team members and the City of Sunny Isles Beach. We know from experience that client expectations can only be met if those expectations are spelled out, which is why effective communication is key for project delivery excellence. The City depends on our insistence on maintaining these real time tracking methods to give Page 36Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 4.1 Firm Qualifications and Experience reassurance that a project is on track and provide advance warning of any potential issues. If a conflict were to arise between the intent of a project and satisfying for instance the permitting requirements for that assignment, the project manager would arrange a meeting with the City, the permitting agency staff and the appropriate members of the Miller Legg Team to further define the source of the conflict, explore alternatives, and seek a resolution that is satisfactory to all parties involved. However, because we have the expertise in-house to anticipate and address such concerns in advance of submitting, these conflicts are not common in our project permitting efforts. Quality Assurance and Quality Control: Miller Legg is committed to producing cost-efficient and high- quality deliverables through significant quality control procedures. William (Bill) Schipske, PE will oversee the Quality Assurance Program throughout this Contract and will ensure all project elements are reviewed for their individual and collective technical merit and thoroughness in conveying the requirements to the agencies and contractors. The stages are interrelated in a sequence which forms our Quality Control Process logic. Quality Assurance begins with a thorough review of the project scope and defining key issues to be addressed with City of Sunny Isles Beach staff and adherence to City codes and criteria. It is incumbent upon the project design professionals to ascertain the full breadth of the scope prior to commencement of the project design. Insisting on provision of accurate as-built data and surveys is critical. Where accurate data doesn’t exist, obtaining accurate survey data and the use of ground penetration radar (GPR) is necessary. The best design begins with the most accurate scope and design information. Quality Control is a multiple step process beginning with each design professional editing and reviewing his/her work as the design process evolves. Most of our projects have 50%, 90%, and 100% submittal stages. Each stage has includes a peer review of both plans and calculations and compliance to codes and criteria. All design stages are reviewed both by the project design professional and by the designated Quality Control Manager. Our experience is that design errors and/or omissions occur less frequently with this process because these errors are identified prior to the completion of the construction plans. Project Coordination with Subconsultants and City: Miller Legg’s multi-disciplinary staff members routinely work together on a broad spectrum of concurrent projects. We handle and prioritize our workload based on the demands of multiple simultaneous projects. We have consistently proven to our clients, including the City of Sunny Isles Beach, our aptitude for delivering assignments on time (often expedited) and within budget by dedicating appropriate resources, technology and equipment. We take seriously our role as head of the consulting team and our responsibility for accurate and timely project execution according to the contract documents. Given our long history in the South Florida AE marketplace, our project managers have experience in administering teams of fellow consultants in the execution of numerous projects for our clients. Miller Legg selects its teaming partners based on the quality of their previous work with us, their dependability and responsiveness as part of a cohesive team. We determine from the outset the responsibilities of each teaming partner and insist each set of deliverables from them is forthcoming, timely, and accurate, so as to meet the project schedule and other requirements. We ensure that each firm shares our work ethic, attention to client service and quality control philosophy. Miller Legg has a staff of 50 professional employees including licensed engineers, surveyors and landscape architects, supported by construction inspectors, landscape and irrigation designers and inspectors, certified arborists, GIS coordinators, biologists and environmental specialists and planners. All key Miller Legg staff included on our organization chart are based in our Miami and Fort Lauderdale offices which will be servicing this Sunny Isles Beach project. e. EMPLOYEES AND HEADQUARTERS STAFF Page 37Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 4.1 Firm Qualifications and Experience • Baptist Health South Florida AE Services Master Agreements – All Services • Bonterra Community Development District (CDD) Civil Engineering • Broward College - Civil/Testing • Broward County Qualified Vendor List for Environmental, Surveying & Other Professional Consulting Svcs • City of Coconut Creek - Architecture, LA and Urban Design Services (RFQ 10-06-21-11) • City of Coral Gables - Landscaping Architectural Consulting (RFQ 2021-008) • City of Coral Springs General Prof Engineering/ Architectural Services RLOI 20-B-298 (LA & Landscape Inspection) • City of Dania Beach/CRA Arch, Surveying, LA, Engineering Consulting (RFQ 20-005) (Utilities Eng, Enviro, LA) • City of Florida City - Professional Engineering (RFQ 2017 - 002) • City of Homestead - Continuing Architectural and Engineering Services for Various Projects • City of Lauderhill Misc. Professional Services (Land Development, Civil-Site and Drainage Systems; Wastewater & Lift Stations, Landscape Architecture) RFQ 2019-057 • City of Miami - CIP Misc LA Services (RFQ 19-20-011) • City of Miami - Civil Engineering Services for Miscellaneous Projects (RFQ 16-17-063) • City of Miami DDA Planning, Engineering, Architecture and Design As Needed Services (RFQ 18-19-01) • City of Miami Beach Architecture/Engineering Services for Capital Renewal and Replacement Projects (2018-141-ND) • City of Miami Beach AE Services on As Needed Basis - Environmental Engineering (2020-096-ND) • City of Miramar AE Library (RFQ 22-12-10-0-2021/ MAR) – All Services • City of Oakland Park - Professional Services for Misc Projects (RFQ 052819) – All Services • City of Pembroke Pines AE Library - Landscape Architecture, Surveying (PSEN-18-02) • City of Pembroke Pines Land Surveying (PSEN-19- 19) • City of Plantation AE - Constr/Proj Mgmt, Landscape Arch, Enviro Eng (RFQ-02cu7-20-0-2020/CP) • City of Pompano Beach and CRA - Landscape Architecture (RLI-T25-20) • City of Tamarac - Landscape Architecture (RFQ 16- 23Q) • City of West Palm Beach - General Engineering Services (RFQ 18-19-405) • Florida Atlantic University - Civil Engineering Services • Florida International University Civil Engineering Professional Services • Lake County - ISA Arborist RFP #20-0528-B * • Maple Ridge Community Development District (CDD) Engineering Services (Inframark) * • Miami (Nicklaus) Children’s Hospital Standard Contractor Agreement *- All Services • Miami Dade College Engineering Services Open Market Pool-Engineering LA, Survey (2020-RB-15) (AEM21009) • Miami-Dade County Equitable Distribution (EDP) Program Continuous Prof Svcs (EDP-PSA-2024) All Services • Miami-Dade County Equitable Distribution (EDP) Program for Regulatory & Economic Resource (RER) Dept (Contract: EDP-PSA-2024; Proj: RE- EDP-PE-DE-66WM) All Services • Miami-Dade County Equitable Distribution (EDP) Program: Multiple Parks Surveying & Underground Utility Location Services - EDP Project EDP-PR- 9999990P • Miami-Dade Co Land & Eng Surveying - mainly Dept Transportation & Public Works (E19- DTPW-04-01-01) Engineering • Miami-Dade Co. WASD Design & Related Services Local Wastewater Pump Stations (E15-WASD-02) * Engineering • Miami-Dade Co. Countywide Infrastructure Investment Program (CIIP) for the Rehabilitation of ISD Surface Lots/Parking Lots (E20-ISD-03) • Miami-Dade Co. WASD General Land and Engineering Surveying and Mapping (E20-WASD- 01A) • Nova Southeastern University Professional Services (All) * All Services • Northern Palm Beach Co. Improvement District Consulting Engineer * All Services • School Board of Broward County - Open End Surveying Consulting (17-113C) • School Board of Broward County Open End Civil Engineering (17-114C) • School District of Palm Beach County Civil Engineering (RFP 20C-025R) * • Seminole Tribe of Florida Enviro Engineering (ERMD) (PUR2021-01-014) • Seminole Tribe of Florida TW Engineering Services (Real Estate) (RFQ 148-2019) Surv_P&Z review f. CURRENT MILLER LEGG CONTINUING SERVICES CONTRACT AS A PRIME CONSULTANT Page 38Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 4.1 Firm Qualifications and Experience • Seminole Tribe of Florida TW Stormwater Master Planning and Prof Eng Svcs (RFQ 84-2019) • St. Lucie Co. General Environmental Consulting Services (Contract C20-01-206) • Town of Davie Utilities Continuing Services - Gen Utility Engineering (RFQ RM-21-16) * • Town of Lauderdale By The Sea (RFQ 16-0901) LA and Engineering • Town of Miami Lakes Misc. Architectural & Engineering Svcs - won for LA (RFQ 2017-31) • Village of Palmetto Bay Landscape Architecture * Contract Term until 2025 or open-ended The numbers of Miller Legg staff and subconsultant staff involved depends on the individual projects performed under these continuing services contracts Relevant to You: 3D Laser Scanner • Data acquisition up to 500,000 measures/second • Range of 800 meters • Create »As-built drawings »CAD/REVIT models • Additional uses: »Route survey »Topography »Earthwork, volume calculations »Point Clouds Page 39Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 4.2. Qualification of Key Personnel Assigned to Engagement MICHAEL KROLL, RLA, FASLA Principal-in-Charge MIGUEL JUNCAL, RLA, CA Assistant Project Manager ANDREW PEREDA, MLA Landscape Designer LIUDMILA FUENTES, MLA Landscape Designer / Community Outreach NELSON PEREZ Landscape Designer MICHAEL BRADLEY, MLA Landscape Designer JARRED RANDALL Landscape Designer WILLIAM MOHLER, CA, TRAQ, PWS, CLI Certified Landscape Inspector / Arborist Supported by: Matthew Dancho, CA, MS, Biologist Paul Mann, CA, TRAQ, Senior Environmental Specialist Jennifer Shipley, Environmental Scientist JOAQUIN MOJICA, PE Project Engineer Supported by: William Schipske, PE, QA/QC Peter Pellerito, PE, Project Engineer Glen Harrelson, PE, Project Engineer Christopher Andreoni, PE, Project Engineer Ismael Santana, PE, Project Engineer Carlos Vazquez, Project Engineer MARTIN ROSSI, PSM Project Surveyor / SUE Services / 3D Laser Scanner Supported by: Larisa Podolskaya, CST I, Senior CAD Technician Sandro Elvir, CST I, Senior CAD Technician Gerald Edelman, CST I, Survey Party Chief BRIAN SHORE, RLA Project Manager Page 40Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 4.2. Qualification of Key Personnel Assigned to Engagement Years of Experience: 36 Years With the Firm: 34 Registrations & Certifications: Registered Landscape Architect, FL, 1989 Registered Landscape Architect, TX, 2009 Fellow American Society of Landscape Architects, 2014 Education: Bachelor of Landscape Architecture University of Florida, 1986 Graduate Studies, Urban and Regional Planning Florida State University, 1989 Publications & Presentations: Florida Educational Facilities Planners' Association, Inc., Making Connections: Benefits of On-Campus Mass Transit Elements, July 2014, Presenter/Speaker Florida Planning and Zoning Association, Public Private Partnerships, June 2007, Presenter/Speaker Professional & Civic Activities: Fellow, American Society of Landscape Architects 2021 Chair, Broward County Bicycle & Pedestrian Advisory Committee, 2009-present Member, Broward Section, American Planning Association Past Chair, Broward Section, American Society of Landscape Architects Member, Florida Board of Landscape Architecture, 2013- current Member, Florida Earth Foundation, Engineering Advisory Committee, 2004-present Member, Florida Recreation and Park Association Member, Florida Redevelopment Association Recipient, UF Distinguished Landscape Architect Alumnus Award, 2013 Member, Urban Land Institute Professional Experience: Mr. Kroll, President of Miller Legg, has been actively involved in projects ranging from large scale habitat restoration to international urban redevelopment projects. His 35+/-year career has concentrated on planning, infrastructure, open space, transportation and redevelopment, principally in South Florida. Mr. Kroll's diverse professional experience has led to projects that successfully integrate environmental, planning and landscape architectural services. Under his leadership, Miller Legg develops project solutions that respond to the natural environment, respect the social fabric and create sustainable aesthetic spaces. Relevant Project Experience: City of Sunny Isles Beach Pelican Community Park - A three-acre active park site, for which Miller Legg managed landscape architecture, irrigation, engineering, surveying and architecture designs for a baseball field, recreation building, playground structure, gymnasium, and related site amenities within the City of Sunny Isles Beach. The project management team at Miller Legg received recognition from the City for their involvement in the design completion of the park. In addition, Miller Legg provided construction observation services. In addition, we also provided grant assistance to secure a Florida Recreational Development Assistant Program (FRDAP) grant for $200,000. FRDAP is a competitive grant program that provides financial assistance to local governments for development or acquisition of land for public outdoor recreational purposes. Award: Award of Merit, American Society of Landscape Architects, Florida Chapter, 2009 City of Sunny Isles Beach Gwen Margolis Park and Pelican Community Park Artificial Turf - The project consisted of the reconstruction of existing natural turf fields at Pelican Community Park and Senator Gwen Margolis Park in the City of Sunny Isles Beach with artificial turf. Miller Legg provided the preparation and permitting of drainage plans to collect under the new drain systems installed as part of the project, as well as surveying services. In addition, construction observation was provided to verify compliance with the plans and for the certification of the project through regulatory agencies. City of Miami Beach 20th Street & Sunset Drive Pocket Park - Under our Continuing Services Contract with the City of Miami Beach, Miller Legg was awarded an assignment to provide survey, civil, geotechnical, electrical, structural engineering and landscape architecture services for the design, permitting and construction of a new ADA-accessible .33-acre pocket park at 20th Street and Sunset Drive. The firm prepared a boundary and topographic survey, assisted with the planning of key program elements and performed schematic design, design development, construction document, bidding and construction tasks. The design incorporates Crime Prevention Through Environmental Design (CPTED) principles. Arborist and irrigation design services were also furnished for this project. Palm Beach Gardens Tennis Center - The City of Palm Beach Gardens planned for a new clubhouse at its Tennis Center, a premier community public 18-court tennis facility and recipient of a 2014 US Tennis Association National Outstanding Facility Award. As part of the OLC architecture team, Miller Legg provided civil and landscape architecture design services for the new 12,000 SF building. Miller Legg's scope of services included schematic design, design development, construction document preparation and construction observation phases. Michael Kroll, RLA, FASLA President | Principal-in-Charge (5% Availability) Page 41Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 4.2. Qualification of Key Personnel Assigned to Engagement Permitting was coordinated through the South Florida Water Management Division, Palm Beach Gardens Fire, Health and Public Works Departments as well as Seacoast Utility Authority. Town of Lauderdale-By-the-Sea Poinciana/Bougainvillea Roadway and Parking Improvements - Under the firm's Continuing Services Contract, Miller Legg provided design and permitting services for parking, roadway and landscape architectural improvements for the Poinciana Street and Bougainvillea Drive area north of Commercial Boulevard to alleviate congestion along the parallel corridor of SR A1A in the Town of Lauderdale-By- The-Sea. Services include: roadway and parking area design, lighting, utility coordination, permitting, landscape, hardscape and irrigation, and pre- and post-construction observation services. City of Lauderhill Sports Park - Miller Legg was retained by the City of Lauderhill to provide civil engineering design, stormwater permitting, landscape architecture, irrigation design, construction specifications and bidding assistance services for proposed amenities improvements at the 12-acre Lauderhill Sports Park. Replacement of the baseball field and cricket pitch natural grass with synthetic turf and the football scoreboard replacement tasks have been finalized. Miller Legg has also completed design of the playground area wood chip surface conversion to synthetic turf, playground shade, modifications to portions of the fitness trail and the addition of new fitness stations trail and exercise equipment. Miami-Dade County Parks, Recreation & Open Space (PROS) Debbie Curtin Interactive Park - Under Miller Legg’s Continuing Services Contract with PROS, Miller Legg was responsible for development of the conceptual rendering plans for this exciting interactive park. Features of the interactive components include musical instruments such as a goblet drum, and vivo metallophone, kettle drum, grandioso chimes, kundu drum, animato metallophone, bongo, hourglass and ring- a-bell panels, textured features such as marble and tracing panels, as well as climbers including a custom rope climber, stone block climb, custom hill net, a bobble rider single and double and a global motion freestanding play structure. The conceptual plans were presented to the County. The firm was also responsible for developing construction documents. City of Coral Gables War Memorial Youth Center Landscape & Engineering - This City of Coral Gables 7-acre War Memorial Youth Center in Miami Dade County represents a living memorial to Coral Gables World War II veterans. The project includes improvements to multi- purpose athletic fields. Miller Legg was responsible for the landscape architecture, civil engineering design and permitting of the improvement program. Specific improvements included athletic field drainage, re-sodding with Bermuda "Celebration" turf and irrigation design. The irrigation system ties into a non- potable well system. Drainage improvements consist of subsurface field improvements that integrate with the existing exfiltration and subsurface drainage systems. Additional services provided include: design development, final construction documents, and construction administration. Miller Legg collaborated with MC Harry Associates on this project. City of Pembroke Pines D/B Taft Street Improvements - Miller Legg was on the RJ Behar team for this Taft Street Design Build project for the City of Pembroke Pines. The firm's scope of services was landscape architectural design and post design services and included the development of design and contract documents including plans and specifications. Support during the construction phase with Requests for Information and contractor submittals was also provided. City of Miami Museum Park Baywalk Phase 3 - Miller Legg provided landscape architecture, civil engineering, lighting/electrical engineering, surveying, permitting and limited construction administration services for the Miami Baywalk Phase 3 Project. Permitting for project improvements was provided through the City of Miami, Miami-Dade County and South Florida Water Management District. Underground utility designation for electric and drainage utilities was performed.The project is a 1/4 mile pedestrian-oriented urban waterfront park and promenade on Biscayne Bay, located adjacent to the east coast greenway. It provides a unique open space that links the American Airlines Arena, Biscayne Boulevard, and Museum Park. The Baywalk design includes custom native stone benches, extensive paver pedestrian spaces, salt-tolerant tropical plantings, as well as themed lighting and site amenities. Due to historic maritime activities in the project area, soil conditions were addressed through the design of unique drainage facilities that minimized potential groundwater impacts. The Baywalk design solution also improved visibility and lighting in the area to discourage vagrancy issues that existed. The planting design not only enhanced aesthetics, but also buffered unsightly adjacent parking and utility areas and minimized exposed surfaces that had been subject to graffiti. This project was performed under our Miscellaneous Landscape Architectural Services contract. Greater Boca Raton Beach and Parks District Ocean Breeze Master Plan - Miller Legg was retained by the Greater Boca Raton Beach and Parks District (GBRBPD) to prepare a Master Plan for Ocean Breeze Park, site of the former Boca Teeca Country Club and Golf Course. The Master Plan will reflect the District's desire to provide a diverse recreational amenity at this 212- acre property for City residents while considering the specific desires and concerns of the adjacent residential communities. The Plan will address Ocean Breeze's future facilities, uses, programs, operation, maintenance and funding and recommend Park modifications, improvements, enhancements and additional uses. Recreational elements may include passive park facilities (trails, walking paths, open fields/areas), golf course/facilities, active park uses (playgrounds, tennis courts, sport courts, aquatics), community center/facilities and potential revenue-generating opportunities. Page 424.2. Qualification of Key Personnel Assigned to Engagement Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA Years of Experience: 22 Years With the Firm: 22 Registrations & Certifications: Registered Landscape Architect, FL, 2005 FDOT Intermediate Maintenance of Traffic, FL, 2013 Education: Bachelor of Science, Landscape Architecture North Carolina A&T State University, 2000 Continuing Education: Eminent Domain for Landscape Architects, 2013 FDOT Landscape Highway Seminar, 2005, 2006, 2008 and 2013 FDOT Outdoor Advertising Workshop, November 2008 and February 2010 FDOT Plan Reviewer's Workshop, November 2006 and November 2007 FDOT Specifications Package Preparation Training Certificate, 2016 Irrigation: The End to Water Waste in Landscapes 2013 Landscape Palm Diseases, 2013 LAP Project Inception to Notice to Proceed, October 2007 LAP Training for Right-of-Way and Real Estate Acquisition, May 2008 PSMJ Project Management Boot Camp, 2007 Professional Experience: As a Senior Landscape Architect, Mr. Shore has significant experience in landscape architectural design and landscape construction services for a variety of public and private projects. Specialties include landscape, hardscape, and irrigation design services for streetscape and roadway projects including the Florida Department of Transportation (FDOT), all aspects of active and passive park design, healthcare campuses, and environmental wetland habitat creation. Other experience includes various residential and commercial projects. Mr. Shore is a Senior Associate of the firm. Relevant Project Experience: City of Sunny Isles Beach Pelican Community Park - A three-acre active park site, for which Miller Legg managed landscape architecture, irrigation, engineering, surveying and architecture designs for a baseball field, recreation building, playground structure, gymnasium, and related site amenities within the City of Sunny Isles Beach. The project management team at Miller Legg received recognition from the City for their involvement in the design completion of the park. In addition, Miller Legg provided construction observation services. In addition, we also provided grant assistance to secure a Florida Recreational Development Assistant Program (FRDAP) grant for $200,000. FRDAP is a competitive grant program that provides financial assistance to local governments for development or acquisition of land for public outdoor recreational purposes. Award: Award of Merit, American Society of Landscape Architects, Florida Chapter, 2009 City of Cocoa Beach CRA Minutemen Causeway - Minutemen Causeway is the “main street” within the Cocoa Beach Central Business District, providing a front door to City Hall and direct access to the beach. Over the last 30 years, development within the Minutemen Causeway corridor included a mix of commercial, residential, and lodging properties. This development drastically increased the impervious conditions of the corridor and significantly impacted the stormwater system within the area, causing regular flooding issues. Miller Legg’s solutions for the Minutemen Causeway project was a holistic design approach to improve the stormwater / drainage issues, while invigorating the area’s economy by creating a pedestrian- oriented beachfront promenade and streetscapes. The project consisted of significant landscape beautification and geometric modifications to the corridor to promote a pedestrian-friendly environment and to stimulate economic development. In conjunction with the redevelopment, the project included low-impact stormwater facilities to meet the Total Maximum Daily Load reduction requirements, as outlined within the Indian River Lagoon Basin Management Action Plan. These stormwater improvements included pervious paver sidewalks and parallel parking, bio-swales with native vegetation, and underground stormwater infiltration facilities with nutrient absorption materials. The entire project was a City pilot program for Low Impact Design (LID) and Best Management Practices (BMP) for stormwater management. Utilizing this innovative approach, this project was able to secure significant funding from the State, including almost $5 million from the Florida Department of Environmental Protection. City of Coconut Creek Sample Road Streetscape - Miller Legg prepared the planting and hardscape design of this four-lane divided roadway in Broward County. The design incorporated existing trees and palms and established a plant and paver palette theme for future Florida Friendly landscape in roadways within the City of Coconut Creek. In addition to landscape, irrigation and hardscape designs, grant Brian Shore, RLA Senior Landscape Architect | Project Manager (60% Availability) Page 434.2. Qualification of Key Personnel Assigned to Engagement Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA preparation services were provided as part of this project. As part of a miscellaneous services contract with the City, Miller Legg prepared the Florida Highway Beautification Council Grant Application and developed Landscape Improvement Design Documents for Sample Road. This approximately three- mile roadway serves as the major east- west corridor through the City of Coconut Creek. The grant application was successful in acquiring $225,000 in matching funds for the project. Award: Broward Beautiful Third Place for Roadway/Swale Beautification, Broward County, 2004 City of Lauderhill Sports Park - Miller Legg was retained by the City of Lauderhill to provide civil engineering design, stormwater permitting, landscape architecture, irrigation design, construction specifications and bidding assistance services for proposed amenities improvements at the 12-acre Lauderhill Sports Park. Replacement of the baseball field and cricket pitch natural grass with synthetic turf and the football scoreboard replacement tasks have been finalized. Miller Legg has also completed design of the playground area wood chip surface conversion to synthetic turf, playground shade, modifications to portions of the fitness trail and the addition of new fitness stations trail and exercise equipment. City of Lauderdale Lakes C-13 Western Greenway LAP - This project is generally described as the design of an FDOT LAP-funded one-mile greenway along the southern C-13 canal bank from SR 7 to the Florida Turnpike. The Project is part of the overall Greenway Trail System for Broward County including two municipalities; the larger portion of which is in the City of Lauderdale Lakes, the remaining portion of which, is in the City of Oakland Park. The Greenway connects to a pedestrian bridge linking the proposed Greenway to an existing City Park, City Hall and the Park Lakes Elementary School. Services provided include landscape architecture, surveying, environmental permitting, NEPA documentation, SFWMD Canal ROW permitting, and engineering services. City of Pembroke Pines Streetscape Design Guidelines - Miller Legg worked on the City of Pembroke Pines City Wide Streetscape Master Plan which included the creation of context sensitive design guidelines for the roadway corridors throughout the City including accommodations for mobility. This Master Plan looked at both the corridor segment and intersection component. Corridor segment components included: median plantings, ‘Side of Road’ (along the right-of-way or street edge) plantings, street trees and specialty plantings. Intersection segment components included: Median nose treatments, crosswalks, expanded pedestrian plazas at the corners, specialty items and icons. Components also included some specialty ‘Threshold’ Plantings, if there was adequate space. Residential streets included ‘Family Ways’. These streets are intra- neighborhood linkages with improvements designed to enhance alternative modes of transportation – such as walking and biking. The Family Ways more effectively links residential communities with schools and parks and with commercial nodes, too, for shopping and to promote commerce at a local level. City of Pembroke Pines D/B Taft Street Improvements - Miller Legg was on the RJ Behar team for this Taft Street Design Build project for the City of Pembroke Pines. The firm's scope of services was landscape architectural design and post design services and included the development of design and contract documents including plans and specifications. Support during the construction phase with Requests for Information and contractor submittals was also provided. City of Wilton Manors Public Complex - The objective of this project was to develop a sustainable design through the use of Best Management Practices, (BMP's) incorporating xeriscaping principles for irrigation and landscaping, including the careful selection of native and adaptive plant species which are hardy and adaptive to the South Florida sub-region, require minimal maintenance after initial plant establishment, avoid monoculture planting and would also thrive in the locations chosen and not require irrigation in the majority of the landscaped areas after the first year of plant establishment. Groundcover, instead of sod, was also incorporated to further achieve the long term goal of a sustainable environment, with regards to chemical uses and provides for an overall less intensive landscape for continued maintenance. Working closely with the Project Architect, the design team included the City's newly adopted Streetscape Design Guidelines and implemented a harmonious placement of plants to complement the building’s architectural features. Special focus was also given to incorporate shading for the City Hall Complex Building and in pedestrianized areas to reduce heat island effects and increase the energy efficiency of the future home for the City of Wilton Manors. Services provided for this project include development of conceptual and final landscape architecture plans, color renderings and construction phase services. City of Port St. Lucie US 1 Irrigation and Landscape Design - Miller Legg is preparing for the City of Port St. Lucie an update to the firm's 2015 irrigation and landscape design plans for 3.5 miles of US Highway 1 from Westmoreland Boulevard to Village Green Drive. Services comprise proposed concept and construction landscape and hardscape improvement plans including median hardscape design, shrub, groundcover and tree plantings or removal, irrigation design and utility coordination. The plans will be submitted to FDOT for approval. The scope includes a presentation of plan exhibits to the City Council by the firm. City of Miami River Greenways - Segment D – As a subconsultant, Miller Legg was contracted to prepare landscape architecture design plans for Segment D of the City of Miami Riverwalk/Greenway Program along the Miami River. The project area includes a four-block (3/10 of a mile) area in conjunction with roadway improvements to include an eight foot multi-use pathway, landscape, hardscape and site furnishings. The project was partially funded by the Local Agency Program. Page 444.2. Qualification of Key Personnel Assigned to Engagement Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA Years of Experience: 18 Years With the Firm: 13 Registrations & Certifications: Registered Landscape Architect, FL, 2014 Certified Arborist, FL, 2018 FDOT Intermediate Maintenance of Traffic, FL, 2019 Education: Bachelor of Landscape Architecture, Minor in Environmental Sciences University of Florida, 2004 Continuing Education: FDOT LAP Training Certificate, 2018 FDOT Specifications Package Preparation Training Certificate, 2017 RainBird Landscape Irrigation Design Process Certificate, 2018 Professional & Civic Activities: Member, International Society of Arboriculture Professional Experience: Mr. Juncal is a Landscape Architect and Certified Arborist focused on a variety of public and private landscape architecture projects including roadway landscaping and irrigation, active and passive park landscape design, higher educational facilities as well as residential and commercial projects. Certified Arborist services include: tree species identification and inventories, tree surveys and canopy mapping, destroyed/damaged tree assessments, tree value estimates, tree grading, tree species selection for planting, mangrove trimming oversight and tree permitting. Relevant Project Experience: City of Sunny Isles Beach Pelican Community Park - A three-acre active park site, for which Miller Legg managed landscape architecture, irrigation, engineering, surveying and architecture designs for a baseball field, recreation building, playground structure, gymnasium, and related site amenities within the City of Sunny Isles Beach. The project management team at Miller Legg received recognition from the City for their involvement in the design completion of the park. In addition, Miller Legg provided construction observation services. In addition, we also provided grant assistance to secure a Florida Recreational Development Assistant Program (FRDAP) grant for $200,000. FRDAP is a competitive grant program that provides financial assistance to local governments for development or acquisition of land for public outdoor recreational purposes. Award: Award of Merit, American Society of Landscape Architects, Florida Chapter, 2009 City of Sunny Isles Beach Gwen Margolis Park and Pelican Community Park Artificial Turf - The project consisted of the reconstruction of existing natural turf fields at Pelican Community Park and Senator Gwen Margolis Park in the City of Sunny Isles Beach with artificial turf. Miller Legg provided the preparation and permitting of drainage plans to collect under the new drain systems installed as part of the project, as well as surveying services. In addition, construction observation was provided to verify compliance with the plans and for the certification of the project through regulatory agencies. City of South Miami Sunset Drive Roadway and Beautification Improvements - For this 1/4-mile roadway and beautification project along Sunset Drive/SW 72nd Street from US 1 to SW 57th Avenue, Miller Legg is providing landscape architecture, arborist, irrigation and construction observation services. The project scope consists of roadway and beautification improvements which includes proposed type ‘F’ curb and gutters, the replacement of sidewalks, and proposing new trees and plants and specified locations throughout the project site. Specific services include tree removal and disposition, irrigation field investigation, hardscape design, landscape design and construction observation services. Miller Legg is a subconsultant to Marlin Engineering. City of Miami Museum Park Baywalk Phase 3 - Miller Legg provided landscape architecture, civil engineering, lighting/electrical engineering, surveying, permitting and limited construction administration services for the Miami Baywalk Phase 3 Project. Permitting for project improvements was provided through the City of Miami, Miami-Dade County and South Florida Water Management District. Underground utility designation for electric and drainage utilities was performed.The project is a 1/4 mile pedestrian-oriented urban waterfront park and promenade on Biscayne Bay, located adjacent to the east coast greenway. It provides a unique open space that links the American Airlines Arena, Biscayne Boulevard, and Museum Miguel Juncal, RLA, CA Landscape Architect | Assistant Project Manager (50% Availability) Page 454.2. Qualification of Key Personnel Assigned to Engagement Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA Park. The Baywalk design includes custom native stone benches, extensive paver pedestrian spaces, salt-tolerant tropical plantings, as well as themed lighting and site amenities. Due to historic maritime activities in the project area, soil conditions were addressed through the design of unique drainage facilities that minimized potential groundwater impacts. The Baywalk design solution also improved visibility and lighting in the area to discourage vagrancy issues that existed. The planting design not only enhanced aesthetics, but also buffered unsightly adjacent parking and utility areas and minimized exposed surfaces that had been subject to graffiti. This project was performed under our Miscellaneous Landscape Architectural Services contract. City of Miami Morningside Park Tennis Center - The City of Miami Morningside Park created an expanded and improved tennis facility at this 42- acre Park. The project included improvements to an existing seven (7) courts that had experienced degradation due to drainage and soil stabilization issues. A new court layout was developed to increase the facility to eight (8) lighted courts and a warm-up training wall amenity. Other tennis improvements included upgraded lighting, fencing ad shaded bench area. A central courtyard was also developed as a key element of the project design. This courtyard created an inviting area for players and spectators to gather before and after matches. A themed paver field with lush landscaping that embraces large existing ficus trees creates a pleasant gathering space not previously found at Morningside Park, and helps establish it as a premier public tennis destination in the City of Miami. Miller Legg services included civil engineering, landscape architecture, permitting and limited construction administration to assist the City in the bidding, observation and certification of the project improvements. Arborist services included evaluating existing trees for health, longevity and relocation prospects. Once relocated, the trees were monitored for ongoing wellbeing on site. Apart from the City, other agencies with jurisdiction for this project include Miami-Dade County Department of Environmental Resources (DERM) and South Florida Water Management District (SFWMD). Received the Facility Showcase award by the Florida Recreation & Park Association. Miller Legg secured this project under the firm's Continuing Services Agreement with the City of Miami. City of Miami Gardens Rolling Oaks Regional Park - Renovations of Rolling Oaks Regional Park include construction of a new one-story 4,000 SF recreation building, renovated restroom facilities, expansion of walking trail with lighting, distance marker, and exercise stations, new pavilions, new parking lot, refurbished basketball and tennis courts, new fencing, new shaded playgrounds, new landscaping and irrigation, addition of horseshoe pits, sand volleyball, mini golf and splashpad, and video system and WIFI. Miller Legg is providing civil engineering, landscape architecture and surveying services for this 7-acre park as a subconsultant to Synalovski, Romanik and Saye Architects. The civil scope includes design of a lift station and on- site force main extension to service the proposed Welcome Center. An arborist assessment of existing trees and palms was carried out as part of the landscape architecture services. City of Miami Fairlawn Community Park - Under our continuing services contract with the City of Miami, Miller Legg was awarded the development of programming, pre-design/concept, design, construction document preparation and construction phase services for a new park on SW 63rd Avenue. The scope includes civil engineering, landscape architecture, certified arborist, surveying and SUE, structural, electrical and geotechnical engineering as well as permitting, opinion of probable cost and limited construction administration. The passive park will contain a shaded/fenced children's playground, dog run, shared pedestrian / bicyclist perimeter path, light bollards, benches, pedestrian pole lighting, irrigation, water fountain, bike racks, receptacles, hardscape furniture, access driveway and perimeter privacy walls. Permitting will be coordinated with the City of Miami, Miami-Dade County DERM, WASD and SFWMD. Survey services include boundary and topographic and tree inventory. Miller Legg will assist the City with the presentation of conceptual designs at Community Meetings to gather public input for a final design. City of Miami Hadley Park Synthetic Turf and Park Improvements - Under Miller Legg's professional service agreement with the City of Miami for landscape architectural services, the firm was retained to provide civil engineering, landscape architecture, permitting and limited construction observation services for the 5.38-acre Hadley Park synthetic turf and park improvements project. Miller Legg provided underground utility designation services in order to prepare an existing utility map. Schematic design documents for the proposed improvements were provided and included client meetings and preliminary Opinion of Probable Cost. Final construction documents were developed for chosen multi- purpose athletic field layout, fencing, fitness stations trail, pedestrian walkways, grading, site amenities, ADA- accessible ramp, sodding and irrigation. Permitting was coordinated with the City, Miami-Dade DERM and SFWMD. Construction administration services were delivered, culminating with a statement of work completion and as- built submittal. City of Miami Beach 20th Street & Sunset Drive Pocket Park - Under our Continuing Services Contract with the City of Miami Beach, Miller Legg was awarded an assignment to provide survey, civil, geotechnical, electrical, structural engineering and landscape architecture services for the design, permitting and construction of a new ADA-accessible .33-acre pocket park at 20th Street and Sunset Drive. The firm prepared a boundary and topographic survey, assisted with the planning of key program elements and performed schematic design, design development, construction document, bidding and construction tasks. The design incorporates Crime Prevention Through Environmental Design (CPTED) principles. Arborist and irrigation design services were also furnished for this project. Page 464.2. Qualification of Key Personnel Assigned to Engagement Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA Years of Experience: 7 Years With the Firm: 6 Registrations & Certifications: FDOT Intermediate Maintenance of Traffic, FL, 2022 Education: Master of Landscape Architecture Florida International University, 2015 Associate in Arts Miami Dade College, 2012 Professional Experience: Mr. Pereda is a Landscape Designer responsible for public and private landscape architectural design projects including active and passive park landscape design and roadway landscaping and irrigation projects. Prior to joining Miller Legg, he was with a local landscape architectural firm for one year as a Landscape Designer. Relevant Project Experience: City of South Miami Sunset Drive Roadway and Beautification Improvements - For this 1/4-mile roadway and beautification project along Sunset Drive/SW 72nd Street from US 1 to SW 57th Avenue, Miller Legg is providing landscape architecture, arborist, irrigation and construction observation services. The project scope consists of roadway and beautification improvements which includes proposed type ‘F’ curb and gutters, the replacement of sidewalks, and proposing new trees and plants and specified locations throughout the project site. Specific services include tree removal and disposition, irrigation field investigation, hardscape design, landscape design and construction observation services. Miller Legg is a subconsultant to Marlin Engineering. City of Miami Beach 20th Street & Sunset Drive Pocket Park - Under our Continuing Services Contract with the City of Miami Beach, Miller Legg was awarded an assignment to provide survey, civil, geotechnical, electrical, structural engineering and landscape architecture services for the design, permitting and construction of a new ADA-accessible .33-acre pocket park at 20th Street and Sunset Drive. The firm prepared a boundary and topographic survey, assisted with the planning of key program elements and performed schematic design, design development, construction document, bidding and construction tasks. The design incorporates Crime Prevention Through Environmental Design (CPTED) principles. Arborist and irrigation design services were also furnished for this project. City of Tamarac University Drive Landscaping Improvements - Miller Legg is providing landscape architecture, hardscape, and irrigation design, permitting, specific purpose survey of the existing medians, utility coordination, utility designation, and construction administrative services for improvements to the existing system of medians on University Drive between NW 78th Street and Southgate Blvd. in the City of Tamarac. Certified Arborist services may also be included for tree analysis, removal and relocation needs. Coordination with numerous agencies including FDOT, SFWMD and the City of Tamarac will also be performed. The project has received funding from an FDOT Grant and included creation of MMOA (Maintenance agreements) between the City and FDOT. Miller Legg worked consistently with both the City of Tamarac and FDOT to meet the strict deadlines to receive this additional funding. City of Tamarac Go-Forward Roadway Landscape Master Plan Update - Miller Legg provided the City of Tamarac with an update to its citywide Roadway Landscape Master Plan. The project consisted of creating a go-forward landscape roadmap guide that will be implemented for years to come. Miller Legg conducted a citywide tree inventory assessment, an evaluation of existing landscape, irrigation and hardscape conditions, an overall assessment of the existing character of the road corridors, and an opportunities and constraints analysis. The overall goal was to create a Landscape Master Plan that provides the City with typical conceptual landscape concepts, recommendations, guidelines, and implementation strategies to follow. The Andrew Pereda, MLA Landscape Designer (25% Availability) Page 474.2. Qualification of Key Personnel Assigned to Engagement Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA Master Plan was unanimously adopted by the City Commission. City of Miami Beach 19th Street Stormwater Pump Station & Botanical Gardens - Miller Legg was part of the Ric-Man Construction and WSP team selected by the City of Miami Beach for its Design-Build 19th Street Stormwater Pump Station project, part of the citywide Stormwater improvement system. Construction of this pump station is part of the overall plan for the City-wide stormwater improvement system to reduce flooding for residents of the Washington Avenue and Convention Center Drive neighborhood. The existing system consists of a collection network with no storage or treatment capability which discharged into the Collins Canal. The project scope includes a stormwater treatment system, energy dissipating structure, seawall modifications and connection of the trunk line to the proposed pump station. Miller Legg's survey services included topographic surveying services to establish the perimeter, show aboveground improvements, trees, accessible storm and sanitary structures, right of way and easements. A survey of utility designation markings was also provided. In addition, the firm prepared an as-built survey of constructed improvements on the 19th Street pump station, the associated parking area and the re-capping areas of the seawall to show above ground utility, storm system catch basins and manholes with invert elevations, signage, and parking stripping. Also, Miller Legg provided tree inventory and analysis, hardscape, landscape and irrigation design. City of Miami Beach Chase Avenue and 34th Street Shared Path - Under its continuing services agreement with the City of Miami Beach, Miller Legg was retained to provide surveying, civil engineering and landscape architecture services related to the new Chase Avenue and 34th Street shared path and roadway improvements project. The 10- ft shared use path will support the use of simultaneous pedestrian and bicycle activity. The scope of services includes topographic surveying, tree inventory, disposition and permitting; irrigation, landscape, hardscape and amenities design, site civil design development for clearing/demolition, signage and marking, paving, grading, drainage and erosion control/pollution prevention. Team subconsultants are performing geotechnical tasks (soil test borings and SFWMD exfiltration tests) and electrical engineering/site lighting. Miller Legg is also responsible for permitting coordination with the City and Miami- Dade DERM, as well as bidding assistance/contract administration and construction phase tasks including construction observation. City of Miami Gardens Rolling Oaks Regional Park - Renovations of Rolling Oaks Regional Park include construction of a new one-story 4,000 SF recreation building, renovated restroom facilities, expansion of walking trail with lighting, distance marker, and exercise stations, new pavilions, new parking lot, refurbished basketball and tennis courts, new fencing, new shaded playgrounds, new landscaping and irrigation, addition of horseshoe pits, sand volleyball, mini golf and splashpad, and video system and WIFI. Miller Legg is providing civil engineering, landscape architecture and surveying services for this 7-acre park as a subconsultant to Synalovski, Romanik and Saye Architects. The civil scope includes design of a lift station and on- site force main extension to service the proposed Welcome Center. An arborist assessment of existing trees and palms was carried out as part of the landscape architecture services. City of Lauderhill Sports Park - Miller Legg was retained by the City of Lauderhill to provide civil engineering design, stormwater permitting, landscape architecture, irrigation design, construction specifications and bidding assistance services for proposed amenities improvements at the 12-acre Lauderhill Sports Park. Replacement of the baseball field and cricket pitch natural grass with synthetic turf and the football scoreboard replacement tasks have been finalized. Miller Legg has also completed design of the playground area wood chip surface conversion to synthetic turf, playground shade, modifications to portions of the fitness trail and the addition of new fitness stations trail and exercise equipment. City of Homestead Biscayne- Everglades Greenway Trail - Among the services Miller Legg provided for this 3.2 mile, 12-foot-wide Biscayne Everglades Greenway shared-use trail project are landscape architectural, engineering, surveying and environmental services including preparation of FDOT- approved construction documents, design of regulatory and wayfinding signs, pavement markings, safe pedestrian push button crossing and necessary drainage within the C-103 Canal right-of-way from East Mowry Drive to SW 137th Avenue in Homestead. The scope of services was based upon a 2017 Florida Shared-use Non-Motorized Trail Agreement between the City of Homestead and FDOT. Topographic and SUE services were delivered. The scope included engineering design and permitting services for the shared-use trail, associated drainage and roadway pedestrian crossings. The firm also carried out Preliminary Natural Resource and Protected Species Investigations and documents related to designation of the Project by FDOT as a Documented Categorical Exclusion. Vizcaya Museum & Gardens Master Plan Refinement - Miller Legg was the landscape architect and traffic/transportation consultant for the Vizcaya Museum and Gardens Master Plan refinement. The Master Plan refinement encompassed the entire Vizcaya property, especially the integration of historical agrarian and horticultural aspects of the Vizcaya village with the guest experience at the Vizcaya Museum and Gardens. Miller Legg collaborated with Quinn Evans Architects and MC Harry Architects on this historical restoration project for Miami-Dade County and the Vizcaya Museum and Gardens Trust. Page 484.2. Qualification of Key Personnel Assigned to Engagement Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA Years of Experience: 5 Years With the Firm: 4 Education: Master of Landscape Architecture Florida International University, 2018 Bachelor of Arts, Urban Design Florida Atlantic University, 2014 Continuing Education: Crime Prevention Through Environmental Design Practioner Seminar, 2013 Green Building and Sustainable Development Course, 2013 Professional Experience: Ms. Fuentes is a Landscape Designer and Recreational Planner supporting the firm's projects including those in the public sector such as the Florida Department of Transportation and South Florida municipalities. Her experience includes landscape design, parks master planning and hardscape design. Relevant Project Experience: City of Miami Armbrister Park Community Center - Esther Mae Armbrister Park is a 4.4-acre City of Miami Park located at 4000 Grand Avenue, Miami, FL 33133 in the Coconut Grove neighborhood. Park amenities include an existing community center, baseball and football fields, tennis and basketball courts, playground and exercise equipment. The project involves replacement of the existing community center building with a new 10,000 SF 2- story facility and outdoor pavilion. Miller Legg is responsible for civil, landscape architecture and SUE services along with boundary, topographic and tree surveying. The firm is providing site civil and utility infrastructure research of utility maps, as-builts and existing site conditions followed by preparation of civil, landscape architecture and irrigation construction documents, government agency permitting coordination, bidding assistance, contract administration and construction administration. Tree inventory, disposition plans and permitting are part of the scope provided by the firm's certified arborists. City of Miami E.G. Sewell Park - Miller Legg is under contract with the City of Miami for program development, pre-design, master planning design including public involvement workshops, construction documents and construction administration services for Sewell Park. The program will be an open passive park with elements including passive walkways through park and preserve areas, pavilions, an eco trail, baywalk, hardscape, floating docks, kayak launch, seawall/living shoreline, wayfinding and historical information signage. The scope of services includes landscape architecture, irrigation, civil engineering, topographical surveying, SUE, certified arborist, structural engineering, electrical engineering, geotechnical engineering, archeological, permitting, bidding assistance and limited construction administration. Miller Legg will also conduct a Bonneted Bat survey and perform a bathymetric survey for the seawall component. The firm is assisting the City to gather community stakeholder input during the design process. Government agency permitting will be coordinated with Miami-Dade Co. DERM, WASD and SFWMD. City of Miami Fairlawn Community Park - Under our continuing services contract with the City of Miami, Miller Legg was awarded the development of programming, pre-design/concept, design, construction document preparation and construction phase services for a new park on SW 63rd Avenue. The scope includes civil engineering, landscape architecture, certified arborist, surveying and SUE, structural, electrical and geotechnical engineering as well as permitting, opinion of probable cost and limited construction administration. The passive park will contain a shaded/fenced children's playground, dog run, shared pedestrian / bicyclist perimeter path, light bollards, benches, pedestrian pole lighting, irrigation, water fountain, bike racks, receptacles, hardscape furniture, access driveway and perimeter privacy walls. Permitting will be coordinated with the City of Miami, Miami-Dade County DERM, WASD and SFWMD. Survey services include boundary and topographic and tree inventory. Miller Legg will assist the City with the presentation of conceptual designs at Community Meetings to gather public input for a final design. Liudmila Fuentes, MLA Landscape Designer | Community Outreach (15% Availability) Page 494.2. Qualification of Key Personnel Assigned to Engagement Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA City of Oakland Park East Dog Park - To assist with the City of Oakland Park's plan to develop a 1-acre Dog Park at the existing Richard Giusti Heart Par Cours Park, Miller Legg was retained for topographic and tree surveying, SUE, engineering and landscape architecture services as well as an opinion of probable cost. The firm is providing schematic designs and renderings to provide off- street parking along NE 6th Avenue and NE 36th Street, sidewalk connectivity, modification to the existing jogging trail, dog park design for small and large dogs which includes landscape improvements, tree additions, canopy shelters, water stations, pet waste stations, benches and asphalt walking paths. This project is being performed under Miller Legg's continuing services contract. City of Port St. Lucie US 1 Irrigation and Landscape Design - Miller Legg is preparing for the City of Port St. Lucie an update to the firm's 2015 irrigation and landscape design plans for 3.5 miles of US Highway 1 from Westmoreland Boulevard to Village Green Drive. Services comprise proposed concept and construction landscape and hardscape improvement plans including median hardscape design, shrub, groundcover and tree plantings or removal, irrigation design and utility coordination. The plans will be submitted to FDOT for approval. The scope includes a presentation of plan exhibits to the City Council by the firm. City of Tamarac Commercial Blvd Landscaping Improvements - The City of Tamarac engaged Miller Legg to provide landscape architectural and survey services for the existing medians along 1.70 miles of West Commercial Blvd in Broward County between North Pine Island Road and Sawgrass Expressway. In addition to landscape architecture, a certified arborist report and survey (including vacuum excavations) services, the Miller Legg team provided lighting and electrical services, irrigation design, permitting, and construction administrative services. Coordination efforts with multiple agencies, such as the Florida Turnpike Authority (FTE) and the South Florida Water Management District (SFWMD), is included in the project scope. Specific services for these roadway improvements entailed providing a specific purpose survey showing only above-ground improvements, compiling a 30% conceptual landscape and lighting plan, and providing 100% construction documents for irrigation, landscape, hardscape, lighting and electrical, and an arborist assessment. City of Tamarac East Side Parks Feasibility Study - The Miller Legg team conducted a needs assessment and feasibility study to address potential new recreation facilities in the eastern portion of the City of Tamarac. The scope included comprehensive recreation planning based on research of existing facilities and programs, recreation opportunities and a needs assessment specific to the study area demographics in order to develop programming, budget and operational needs for the proposed improvements. Community input was gathered via various survey platforms and City staff and public workshops scheduled to refine recreation needs and desires. The final deliverable was a Feasibility Study which contained a 10-year capital improvement plan for the implementation of the proposed improvements and acquisitions, an analysis of funding opportunities and a narrative report to outline the process and results. City of Weston Parks & Recreation Master Plan - In 2021, the City of Weston selected Miller Legg to develop a municipal parks and recreation plan (PRMP) to incorporate recommendations for provision of future facilities programs and services, land acquisition and development, maintenance, operations and management. A master-planned 27- square-mile community of 68,000 residents in Broward County, Weston currently has 242 open space and park acres and 16 existing parks offering a variety of recreational and athletic amenities and activities. The Master Plan will include components including Department Mission Vision and Objectives, Community Inventory and Assessment, Needs Assessment, Level of Service Standards, Parks and Recreation Strategic Plan, Recreation Trends Analysis, Recreation Programming Plan, ADA Transition Plan, Community Relations and Marketing Plan, Community Health and Environmental Responsibility Plan. City of Tamarac University Drive Landscaping Improvements - Miller Legg is providing landscape architecture, hardscape, and irrigation design, permitting, specific purpose survey of the existing medians, utility coordination, utility designation, and construction administrative services for improvements to the existing system of medians on University Drive between NW 78th Street and Southgate Blvd. in the City of Tamarac. Certified Arborist services may also be included for tree analysis, removal and relocation needs. Coordination with numerous agencies including FDOT, SFWMD and the City of Tamarac will also be performed. The project has received funding from an FDOT Grant and included creation of MMOA (Maintenance agreements) between the City and FDOT. Miller Legg worked consistently with both the City of Tamarac and FDOT to meet the strict deadlines to receive this additional funding. Greater Boca Raton Beach and Parks District Ocean Breeze Master Plan - Miller Legg was retained by the Greater Boca Raton Beach and Parks District (GBRBPD) to prepare a Master Plan for Ocean Breeze Park, site of the former Boca Teeca Country Club and Golf Course. The Master Plan will reflect the District's desire to provide a diverse recreational amenity at this 212- acre property for City residents while considering the specific desires and concerns of the adjacent residential communities. The Plan will address Ocean Breeze's future facilities, uses, programs, operation, maintenance and funding and recommend Park modifications, improvements, enhancements and additional uses. Recreational elements may include passive park facilities (trails, walking paths, open fields/areas), golf course/facilities, active park uses (playgrounds, tennis courts, sport courts, aquatics), community center/facilities and potential revenue-generating opportunities. Page 504.2. Qualification of Key Personnel Assigned to Engagement Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA Years of Experience: 16 Years With the Firm: 16 Registrations & Certifications: FDOT Intermediate Maintenance of Traffic, FL, 2013 Education: Bachelor of Landscape Architecture University of Florida, 2006 Continuing Education: FDOT Specifications Package Preparation Training, 2017 Professional & Civic Activities: Member, Alpha Rho Chi, National Professional Honor Society Associate Member, American Society of Landscape Architects Professional Experience: Mr. Perez is a Landscape Designer responsible for landscape architectural design for a variety of public and private projects including roadway landscaping and irrigation, active and passive park landscape design, as well as residential and commercial projects. Relevant Project Experience: City of Sunny Isles Beach Pelican Community Park - A three-acre active park site, for which Miller Legg managed landscape architecture, irrigation, engineering, surveying and architecture designs for a baseball field, recreation building, playground structure, gymnasium, and related site amenities within the City of Sunny Isles Beach. The project management team at Miller Legg received recognition from the City for their involvement in the design completion of the park. In addition, Miller Legg provided construction observation services. In addition, we also provided grant assistance to secure a Florida Recreational Development Assistant Program (FRDAP) grant for $200,000. FRDAP is a competitive grant program that provides financial assistance to local governments for development or acquisition of land for public outdoor recreational purposes. Award: Award of Merit, American Society of Landscape Architects, Florida Chapter, 2009 City of Miami Buena Vista Heights Landscape – Miller Legg prepared landscape architecture design plans for the City of Miami Buena Vista Heights neighborhood. The neighborhood roadway improvements project area included tree removal/mitigation and landscape design. Miller Legg was a subconsultant to RJ Behar and Company. City of Miramar Miramar Parkway Redevelopment - This redevelopment and streetscape project included a two- mile, two-block urban section of the Miramar Parkway corridor adjacent to SR 7/US 441. Miller Legg designed the landscape and irrigation improvements for Florida Department of Transportation (FDOT) along this corridor north and south of Miramar Parkway. In addition, certified arborist services were provided for a tree inventory and quality evaluation. The proposed streetscape improvements included enhancement of the pedestrian corridor to encourage safe pedestrian traffic for adjacent commercial and office uses. The design also called for consolidated parking areas rather than replacing backout parking in front of businesses for the safety of both the pedestrian and automobile traffic and to improve the street operation and the aesthetics of the streetscape. City of Pembroke Pines D/B Taft Street Improvements - Miller Legg was on the RJ Behar team for this Taft Street Design Build project for the City of Pembroke Pines. The firm's scope of services was landscape architectural design and post design services and included the development of design and contract documents including plans and specifications. Support during the construction phase with Requests for Information and contractor submittals was also provided. City of Pembroke Pines Streetscape Design Guidelines - Miller Legg worked on the City of Pembroke Pines City Wide Streetscape Master Plan which included the creation of context sensitive design guidelines for the roadway corridors throughout the City including accommodations for mobility. This Master Plan looked at both the corridor segment and intersection component. Corridor segment components included: median plantings, ‘Side of Road’ (along the right-of-way or street edge) plantings, street trees and specialty plantings. Intersection segment components included: Median nose treatments, crosswalks, expanded pedestrian plazas at the corners, specialty items and icons. Components Nelson Perez Landscape Designer (15% Availability) Page 514.2. Qualification of Key Personnel Assigned to Engagement Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA also included some specialty ‘Threshold’ Plantings, if there was adequate space. Residential streets included ‘Family Ways’. These streets are intra- neighborhood linkages with improvements designed to enhance alternative modes of transportation – such as walking and biking. The Family Ways more effectively links residential communities with schools and parks and with commercial nodes, too, for shopping and to promote commerce at a local level. City of Lauderdale Lakes C-13 Western Greenway LAP - This project is generally described as the design of an FDOT LAP-funded one-mile greenway along the southern C-13 canal bank from SR 7 to the Florida Turnpike. The Project is part of the overall Greenway Trail System for Broward County including two municipalities; the larger portion of which is in the City of Lauderdale Lakes, the remaining portion of which, is in the City of Oakland Park. The Greenway connects to a pedestrian bridge linking the proposed Greenway to an existing City Park, City Hall and the Park Lakes Elementary School. Services provided include landscape architecture, surveying, environmental permitting, NEPA documentation, SFWMD Canal ROW permitting, and engineering services. City of Coconut Creek Copans Road Median Landscape Architecture Plans - For this median improvement project along Copans Road between Lyons Road and the Florida Turnpike Overpass, Miller Legg provided landscape, hardscape and irrigation design plans, tree inventory, surveying, permitting, pre-construction and construction observation services to the City. Tree, streets and highway permitting was coordinated with Broward County. City of Miramar - Miramar Parkway LAP Streetscape Improvements from 62nd to 64th Avenue - Miramar Parkway Streetscape Improvement project was a Local Agency Program (LAP)-funded revitalization project in the City of Miramar. The project entailed Miramar Parkway's eastern gateway segment from 62nd to 64th Avenue, approximately 1/2 mile in length. The project included intersection improvements, traffic signal modifications/upgrades and sidewalk and Florida Friendly landscape beautification throughout the project limits. Services provided included: surveying including topographic surveying, maintenance of traffic, underground utility designation, landscape architecture, hardscape design, drainage and stormwater permitting, design and management, lighting and electrical design, geotechnical design, traffic engineering, tree permitting and arborist services, as well as LAP coordination, permitting and submittal documentation. Miller Legg developed a master plan for this corridor, incorporating access management and shared commercial parking facilities to enhance the commercial viability of the corridor. Utilizing the master plan, extensive public outreach was conducted with the corridor stakeholder to establish consensus on the redevelopment and roadway plan. City of Wilton Manors Public Complex - The objective of this project was to develop a sustainable design through the use of Best Management Practices, (BMP's) incorporating xeriscaping principles for irrigation and landscaping, including the careful selection of native and adaptive plant species which are hardy and adaptive to the South Florida sub-region, require minimal maintenance after initial plant establishment, avoid monoculture planting and would also thrive in the locations chosen and not require irrigation in the majority of the landscaped areas after the first year of plant establishment. Groundcover, instead of sod, was also incorporated to further achieve the long term goal of a sustainable environment, with regards to chemical uses and provides for an overall less intensive landscape for continued maintenance. Working closely with the Project Architect, the design team included the City's newly adopted Streetscape Design Guidelines and implemented a harmonious placement of plants to complement the building’s architectural features. Special focus was also given to incorporate shading for the City Hall Complex Building and in pedestrianized areas to reduce heat island effects and increase the energy efficiency of the future home for the City of Wilton Manors. Services provided for this project include development of conceptual and final landscape architecture plans, color renderings and construction phase services. Palm Beach Gardens Tennis Center - The City of Palm Beach Gardens planned for a new clubhouse at its Tennis Center, a premier community public 18-court tennis facility and recipient of a 2014 US Tennis Association National Outstanding Facility Award. As part of the OLC architecture team, Miller Legg provided civil and landscape architecture design services for the new 12,000 SF building. Miller Legg's scope of services included schematic design, design development, construction document preparation and construction observation phases. Permitting was coordinated through the South Florida Water Management Division, Palm Beach Gardens Fire, Health and Public Works Departments as well as Seacoast Utility Authority. City of Tamarac University Drive Landscaping Improvements - Miller Legg is providing landscape architecture, hardscape, and irrigation design, permitting, specific purpose survey of the existing medians, utility coordination, utility designation, and construction administrative services for improvements to the existing system of medians on University Drive between NW 78th Street and Southgate Blvd. in the City of Tamarac. Certified Arborist services may also be included for tree analysis, removal and relocation needs. Coordination with numerous agencies including FDOT, SFWMD and the City of Tamarac will also be performed. The project has received funding from an FDOT Grant and included creation of MMOA (Maintenance agreements) between the City and FDOT. Miller Legg worked consistently with both the City of Tamarac and FDOT to meet the strict deadlines to receive this additional funding. Page 524.2. Qualification of Key Personnel Assigned to Engagement Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA Years of Experience: 4 Years With the Firm: 3 Education: Master of Landscape Architecture Florida International University, 2019 Bachelor of Arts, Religion, Minor in Education Florida State University, 2014 Professional Experience: Mr. Bradley is a Landscape Designer supporting the firm's projects including those in the public sector such as municipal parks and recreation master plans, park landscape, hardscape and irrigation design, educational facilities as well as streetscape for the Florida Department of Transportation. Relevant Project Experience: City of Miami Fairlawn Community Park - Under our continuing services contract with the City of Miami, Miller Legg was awarded the development of programming, pre-design/concept, design, construction document preparation and construction phase services for a new park on SW 63rd Avenue. The scope includes civil engineering, landscape architecture, certified arborist, surveying and SUE, structural, electrical and geotechnical engineering as well as permitting, opinion of probable cost and limited construction administration. The passive park will contain a shaded/fenced children's playground, dog run, shared pedestrian / bicyclist perimeter path, light bollards, benches, pedestrian pole lighting, irrigation, water fountain, bike racks, receptacles, hardscape furniture, access driveway and perimeter privacy walls. Permitting will be coordinated with the City of Miami, Miami-Dade County DERM, WASD and SFWMD. Survey services include boundary and topographic and tree inventory. Miller Legg will assist the City with the presentation of conceptual designs at Community Meetings to gather public input for a final design. City of Miramar Historic Public Safety Complex - The City of Miramar replaced the Civic Center and Child Care building with a new one-story 24,000 SF building to accommodate its police substation, storage, administrative and other law enforcement and public safety facilities, in addition to a surface parking lot for safety vehicles. The new building was certified Gold LEED certification. Miller Legg provided civil engineering design, permitting and construction administration services as part of the Architects Design Group team. Government permitting included the City of Miramar, Broward County and FDEP. The firm also provided LEED certification and value engineering review services. City of Plantation Parks & Recreation Master Plan - Miller Legg was selected to prepare the first Plantation Parks and Recreation Master Plan. The firm provided comprehensive recreation planning to create the Master Plan. The Parks and Recreation Master Plan is a tool intended to help the City of Plantation meet the current and future recreation needs of the community. The resident-driven plan serves as a source of applicable decision-making information, and establishes clear goals and actionable objectives to guide staff, advisory committees, and City Council in their work to maintain and enhance Plantation’s system of parks, recreation facilities, and programs over the next ten years. The Plan was based upon research of existing facilities and programs, recreation opportunities and needs analyses specific to City of Plantation demographics. To effectively gather and disseminate information during the planning phase, Public Outreach was an important focus of the project. Public workshops and Public Online Survey assisted in determining community recreation needs and desires. All 42 Parks and 5 Community Centers sites were reviewed, along with future expansion opportunities to accommodate program requirements. In addition, Miller Legg assisted the City to achieve its prestigious national CAPRA (Commission for Accreditation of Park and Recreation Agencies) accreditation, a demonstrated management system of best practices and measure of agency quality of operation, management and service to the community. Michael Bradley, MLA Landscape Designer (15% Availability) Page 534.2. Qualification of Key Personnel Assigned to Engagement Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA City of Tamarac Commercial Blvd Landscaping Improvements - The City of Tamarac engaged Miller Legg to provide landscape architectural and survey services for the existing medians along 1.70 miles of West Commercial Blvd in Broward County between North Pine Island Road and Sawgrass Expressway. In addition to landscape architecture, a certified arborist report and survey (including vacuum excavations) services, the Miller Legg team provided lighting and electrical services, irrigation design, permitting, and construction administrative services. Coordination efforts with multiple agencies, such as the Florida Turnpike Authority (FTE) and the South Florida Water Management District (SFWMD), is included in the project scope. Specific services for these roadway improvements entailed providing a specific purpose survey showing only above-ground improvements, compiling a 30% conceptual landscape and lighting plan, and providing 100% construction documents for irrigation, landscape, hardscape, lighting and electrical, and an arborist assessment. City of Tamarac East Side Parks Feasibility Study - The Miller Legg team conducted a needs assessment and feasibility study to address potential new recreation facilities in the eastern portion of the City of Tamarac. The scope included comprehensive recreation planning based on research of existing facilities and programs, recreation opportunities and a needs assessment specific to the study area demographics in order to develop programming, budget and operational needs for the proposed improvements. Community input was gathered via various survey platforms and City staff and public workshops scheduled to refine recreation needs and desires. The final deliverable was a Feasibility Study which contained a 10-year capital improvement plan for the implementation of the proposed improvements and acquisitions, an analysis of funding opportunities and a narrative report to outline the process and results. City of Tamarac University Drive Landscaping Improvements - Miller Legg is providing landscape architecture, hardscape, and irrigation design, permitting, specific purpose survey of the existing medians, utility coordination, utility designation, and construction administrative services for improvements to the existing system of medians on University Drive between NW 78th Street and Southgate Blvd. in the City of Tamarac. Certified Arborist services may also be included for tree analysis, removal and relocation needs. Coordination with numerous agencies including FDOT, SFWMD and the City of Tamarac will also be performed. The project has received funding from an FDOT Grant and included creation of MMOA (Maintenance agreements) between the City and FDOT. Miller Legg worked consistently with both the City of Tamarac and FDOT to meet the strict deadlines to receive this additional funding. City of Fort Lauderdale Las Olas Streetscape Design - As a subconsultant to The Corradino Group, Miller Legg has provided various landscape architecture services for the Las Olas Streetscape Project. The project spans eastward from Andrews Ave. and cuts through four (4) distinct districts along Las Olas Boulevard including Downtown Las Olas, The Historic Shops, Colee Hammock, and The Isles. Each area has been designed to retain its individual identity, while simultaneously being part of a cohesive thoroughfare design between Downtown Fort Lauderdale and The Beach. Miller Legg was responsible for the planting design along the corridor which was entirely composed of native and Florida Friendly species to create a pedestrian friendly environment accenting each area along Las Olas Boulevard. Miller Legg also provided placemaking and programming services, for which the designers created parklets, plazas, and iconic hardscape elements with water features and public art installations that work as resting places and wayfinding spots. These systems incorporate such slogans as “Meet me at Las Olas” “Colee Hammock” and “The Isles” in the hardscape to promote wayfinding and create an “Instagram-able” moment. Overhead shade structures were also designed to help with wayfinding through decorative elements subtly depicting the initials corresponding to each area (eg. “HSLO” for Historic Shops Las Olas). Miller Legg's scope included programming the pedestrian areas along the corridor which integrated hardscape design, seating design, and open space utilization. The firm assisted with multiple public outreach efforts including meetings with homeowner association groups. Miller Legg surveyors used 3D laser scanning equipment to collect and process LiDAR data in preparation for project conceptual design data needs.” City of Homestead Biscayne Everglades Trail Western Expansion Feasibility Study - Miller Legg was retained to conduct a feasibility study to assist the City of Homestead in determining the preferred route and trail design for the alignment of the Western Extension of the existing Biscayne Everglades Greenway Trail (BEGT). The Study Area is from the C-103 Canal Crossing at East Mowry Drive to the 192nd Ave. intersection with West Mowry Drive. Miller Legg's scope comprises compilation of an existing conditions inventory, preparation of a matrix of criteria to use in the evaluation of the potential trail alignments, preparation of various preliminary alignment alternatives with Opinions of Probable Cost, development of a preferred alignment with location, typical design, proposed enhancements, right of way/property issues associated with implementation, followed by creation of the Feasibility Report for presentation to the City Council. City of Hallandale Beach Atlantic Shores Boulevard from US-1 / Federal Highway to Diplomat Parkway - This 1/4-mile milling and resurfacing project included enhancements along Atlantic Shores Boulevard between US 1 and Diplomat Parkway in the City of Hallandale Beach. Enhancements included drainage, signage and pavement markings, signalization, lighting, landscaping and hardscape. Specific landscape architecture analysis and design services included landscape architecture and irrigation plans for the median islands, swales, parking islands/bulbouts, hardscape and a roundabout. Page 544.2. Qualification of Key Personnel Assigned to Engagement Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA Years of Experience: 2 Years With the Firm: 2 Education: Bachelor of Landscape Architecture, Landscape Architecture University of Florida, 2022 Professional Experience: Mr. Randall is a Landscape Designer responsible for landscape architectural design for a variety of public projects including roadway landscaping and irrigation, and active and passive park landscape design. Relevant Project Experience: City of Miami E.G. Sewell Park - Miller Legg is under contract with the City of Miami for program development, pre-design, master planning design including public involvement workshops, construction documents and construction administration services for Sewell Park. The program will be an open passive park with elements including passive walkways through park and preserve areas, pavilions, an eco trail, baywalk, hardscape, floating docks, kayak launch, seawall/living shoreline, wayfinding and historical information signage. The scope of services includes landscape architecture, irrigation, civil engineering, topographical surveying, SUE, certified arborist, structural engineering, electrical engineering, geotechnical engineering, archeological, permitting, bidding assistance and limited construction administration. Miller Legg will also conduct a Bonneted Bat survey and perform a bathymetric survey for the seawall component. The firm is assisting the City to gather community stakeholder input during the design process. Government agency permitting will be coordinated with Miami-Dade Co. DERM, WASD and SFWMD. Miami-Dade County Parks, Recreation & Open Space (PROS) Greynolds Park Playground Design – Miller Legg was retained to provide survey, civil engineering, and landscape architecture services at Greynolds Park in North Miami Beach. The East Greynolds Design Program includes the addition of an ADA compliant sidewalk connecting the existing parking area to the existing shelter. The West Greynolds Park Design Program includes the demolition of the existing playground and the construction of a new playground that meets nature play criteria set forth by Miami-Dade County PROS. Educational and historic signage will be designed and added to the playground area. Miller Legg has also provided topographic and tree surveying and SUE services for this property. City of Fort Lauderdale Las Olas Streetscape Design - As a subconsultant to The Corradino Group, Miller Legg has provided various landscape architecture services for the Las Olas Streetscape Project. The project spans eastward from Andrews Ave. and cuts through four (4) distinct districts along Las Olas Boulevard including Downtown Las Olas, The Historic Shops, Colee Hammock, and The Isles. Each area has been designed to retain its individual identity, while simultaneously being part of a cohesive thoroughfare design between Downtown Fort Lauderdale and The Beach. Miller Legg was responsible for the planting design along the corridor which was entirely composed of native and Florida Friendly species to create a pedestrian friendly environment accenting each area along Las Olas Boulevard. Miller Legg also provided placemaking and programming services, for which the designers created parklets, plazas, and iconic hardscape elements with water features and public art installations that work as resting places and wayfinding spots. These systems incorporate such slogans as “Meet me at Las Olas” “Colee Hammock” and “The Isles” in the hardscape to promote wayfinding and create an “Instagram-able” moment. Overhead shade structures were also designed to help with wayfinding through decorative elements subtly depicting the initials corresponding to each area (eg. “HSLO” for Historic Shops Las Olas). Miller Legg's scope included programming the pedestrian areas along the corridor which integrated hardscape design, seating design, and open space Jarred Randall Landscape Designer (50% Availability) Page 554.2. Qualification of Key Personnel Assigned to Engagement Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA utilization. The firm assisted with multiple public outreach efforts including meetings with homeowner association groups. Miller Legg surveyors used 3D laser scanning equipment to collect and process LiDAR data in preparation for project conceptual design data needs.” City of Tamarac Commercial Blvd Landscaping Improvements - The City of Tamarac engaged Miller Legg to provide landscape architectural and survey services for the existing medians along 1.70 miles of West Commercial Blvd in Broward County between North Pine Island Road and Sawgrass Expressway. In addition to landscape architecture, a certified arborist report and survey (including vacuum excavations) services, the Miller Legg team provided lighting and electrical services, irrigation design, permitting, and construction administrative services. Coordination efforts with multiple agencies, such as the Florida Turnpike Authority (FTE) and the South Florida Water Management District (SFWMD), is included in the project scope. Specific services for these roadway improvements entailed providing a specific purpose survey showing only above-ground improvements, compiling a 30% conceptual landscape and lighting plan, and providing 100% construction documents for irrigation, landscape, hardscape, lighting and electrical, and an arborist assessment. Town of Davie Governor Leroy Collins Farm Park – The new Governor Leroy Collins Farm Park 80- acre parcel was purchased in 2008 through a combination of funds from Davie District 4 open space bonds, Broward County, the Farm Bureau and the Florida Communities Trust Fund. The first phase of the park will consist of 20-acres of development and will include an educational center, riding arena, stables, farmers market and playground. Located east of I-75, the park is being built to preserve the rural lifestyle of the Town of Davie. Miller Legg is providing civil engineering, surveying, landscape architecture, and environmental services as part of the MC Harry team. The park will provide volunteer opportunities, farm tours, field trips, summer camps, community gardens, and equestrian programs for the special needs population. Miller Legg's civil engineering scope includes earthwork analysis; paving, grading and drainage; water and sanitary sewer, pavement marking and signage, stormwater pollution prevention; offsite improvements; phasing plans, permitting through the Town of Davie, Central Broward Water Control District, City of Sunrise, Florida Department of Environmental Protection, Broward County Environmental Protections and South Florida Water Management District; and construction administration. The wetlands scope includes wetlands due diligence, and the landscape architecture scope includes planting design, irrigation design and pedestrian and equestrian trails. Surveying services consisted of a topographic and tree survey. Veterans Administration (VA) Florida National Cemetery Ph5 Design Build - Miller Legg was retained to provide surveying, civil engineering, landscape architecture and environmental services for the Florida National Cemetery Phase 5 Design Build Project located in Bushnell, FL. The project comprises the next and final construction phase of cemetery development and primarily includes master planning design and construction involving the development of approximately 40 acres of undeveloped land to accommodate approximately 50,350 gravesites, including both casket and cremation sites in new burial sections. The scope of work also includes topographic survey, agency permitting, environmental compliance review, threatened and endangered species review, addressing corrections and repairs and evaluating existing structures and landscaping/irrigation for sustainability. Miller Legg is a subconsultant to The LA Group. United States Department of Veterans Affairs South Florida National Cemetery Phase 2 Design- Build - Miller Legg is providing civil, survey, landscape architecture, irrigation design and environmental services for Phase 2 of this Design Build project located in Lake Worth. Survey services consist of boundary and topographic surveys and surveyor title review. Environmental tasks include wetland mitigation assistance and threatened and endangered species coordination in addition to annual mitigation monitoring over 5 years and gopher tortoise survey, permitting and relocation. The firm is providing landscape and irrigation design development, construction and record drawing documents. Civil construction document preparation including signing and pavement marking, pre-construction and construction period services are also being provided. Miller Legg was the prime consultant for the master planning, design, and construction for the development of the 313-acre national cemetery in Palm Beach County. Orlando VA Healthcare System (VA) Medical Center Facility Master Plan - Miller Legg is providing irrigation and landscape architecture services for the Orlando Veterans Administration (VA) Medical Center Facility Master Plan project, which consists of four (4) sites: Lake Nona VA Medical Center, Lake Baldwin VA Outpatient Clinic, Lakemont Campus VA Medical Center and Viera Outpatient Clinic. The firm is responsible for the evaluation and review of existing conditions, and development of design recommendations, including Opinion of Probable Costs. Environmental concerns and methods will be identified to make each campus "greener" by using sustainable irrigation and landscape principles. Miller Legg will prepare a Comprehensive Irrigation Facility Master Plan taking account of future campus projects, and will assist with a review of the 100% landscape plan. Miami-Dade County Water and Sewer Department (WASD) Pump Station 0491 Force Main Extension Survey - Miller Legg was contracted by 300 Engineering Group to provide route surveys of approximately 5500 linear feet of portions of Collins Avenue and Golden Beach Drive for the purpose of designing new force mains along this route. The firm's scanning technology was successfully used to produce this survey. An extension to the north was requested by 300 Engineering Group. The ultimate Client for this project was WASD. Page 564.2. Qualification of Key Personnel Assigned to Engagement Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA Years of Experience: 14 Years With the Firm: 9 Registrations & Certifications: FDEP Stormwater, Erosion & Sedimentation Inspector, FL, 2011 Professional Wetland Scientist, 2021 ISA Intro to Urban Forestry, 2020 FDOT Intermediate Maintenance of Traffic, FL, 2016 Certified Landscape Inspector, FL, 2014 Advanced Airport Wildlife Hazard Management, FL, 2014 Certified Arborist, 2014 Broward County Basic Tree Pruning, FL, 2012 SFWMD Certified Airboat Pilot Education: Bachelor of Science, Ecology & Biology, Minor in Geography Florida Atlantic University, 2008 Certificate, Environmental Studies Florida Atlantic University, 2005 Continuing Education: FDOT LAP Certification Webinar, 2015 NRA First Steps Shotgun Orientation Publications & Presentations: FAU, Carnivorous Plants, 2010, Co-Presenter FAU, Suwannee River Basin, 2007 SFWMD, Everglades Tree Island Health, 2011, Co-Presenter Professional & Civic Activities: Past Member, City of Plantation Landscape Planning & Review Board Member, Florida Urban Forestry Council (FUFC) Member, International Society of Arboriculture Member, Landscape Inspectors Association of Florida (LIAF) Past Member, Native Plant Society, Broward County Chapter Member, South Florida Association of Environmental Professionals (SFAEP) Professional Experience: Mr. Mohler is a Certified Arborist and Certified Landscape Inspector providing a variety of services to both public and private sector clients, including: tree species identification and inventories, tree surveys and canopy mapping, destroyed/damaged tree assessments, tree value estimates, tree grading, tree species selection for planting, mangrove trimming oversight and tree permitting. Relevant Project Experience: City of Miami Beach South Beach Tree and Dune Inventory - Miller Legg and its Certified Arborists conducted a comprehensive tree and dune vegetation inventory on a section of South Beach east of the pedestrian walk from 3rd to 5th Streets. All 300 tree species found within the area were inventoried as point locations with associated attributes and all dominant shrub and ground cover species were collected as polygon data with associated percent coverage and species data. The information was then displayed on a digital map and the data was provided to the client in .shp file format. Miller Legg was a subconsultant to Coastal Systems International. City of Miami E.G. Sewell Park - Miller Legg is under contract with the City of Miami for program development, pre-design, master planning design including public involvement workshops, construction documents and construction administration services for Sewell Park. The program will be an open passive park with elements including passive walkways through park and preserve areas, pavilions, an eco trail, baywalk, hardscape, floating docks, kayak launch, seawall/living shoreline, wayfinding and historical information signage. The scope of services includes landscape architecture, irrigation, civil engineering, topographical surveying, SUE, certified arborist, structural engineering, electrical engineering, geotechnical engineering, archeological, permitting, bidding assistance and limited construction administration. Miller Legg will also conduct a Bonneted Bat survey and perform a bathymetric survey for the seawall component. The firm is assisting the City to gather community stakeholder input during the design process. Government agency permitting will be coordinated with Miami-Dade Co. DERM, WASD and SFWMD. City of Miami La Pastorita Neighborhood Roadway Improvements Study - This neighborhood improvement project is located in the La Pastorita neighborhood, bounded by SW 11th Street to the north, SW 16th Street to the south, SW 34th Avenue to the east and SW 37th Avenue to the west. The goal of the project is to promote pedestrian friendly roadways and neighborhood beautification. Miller Legg is providing landscape architecture and Certified Arborist services. Specific services include tree inventory and assessment, tree master plan coordination, conceptual plan / color rendering for the La Pastorita Neighborhood Roadway Improvements Phase 1. Other activities include public outreach and future construction program analysis. Miller Legg is a subconsultant to The Corradino Group. City of Tamarac Commercial Blvd Landscaping Improvements - The City of Tamarac engaged Miller Legg to provide landscape architectural and survey services for the existing medians along 1.70 miles of West Commercial Blvd in Broward County between North Pine Island Road and Sawgrass Expressway. In addition to landscape architecture, a certified arborist report and survey (including vacuum excavations) services, the Miller Legg team provided lighting and electrical services, irrigation design, permitting, and construction administrative services. Coordination efforts with multiple agencies, such as the Florida Turnpike William Mohler, CA, TRAQ, PWS, CLI Certified Landscape Inspector | Arborist (5% Availability) Page 574.2. Qualification of Key Personnel Assigned to Engagement Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA Authority (FTE) and the South Florida Water Management District (SFWMD), is included in the project scope. Specific services for these roadway improvements entailed providing a specific purpose survey showing only above-ground improvements, compiling a 30% conceptual landscape and lighting plan, and providing 100% construction documents for irrigation, landscape, hardscape, lighting and electrical, and an arborist assessment. City of Fort Lauderdale Executive Airport (FXE) Parcels B, C & D Environmental Services - As a result of our Environmental Continuing Services contract with the City of Fort Lauderdale, Miller Legg is familiar with airport property that contains related office space which is leased and operated by private developments. While the airfield is the key to the operations, the drainage analysis and regulatory agencies will review the larger ownership of Fort Lauderdale Executive Airport (FXE) for compliance and analysis. Miller Legg has been actively involved in the review of the undeveloped but permitted sites for Parcels B, C, and D. The knowledge of these sites is important to understand that the existing undeveloped conditions differ from what has been designed and permitted. Furthermore, our involvement in review of the permits and subsequent proposals to potentially modify or alter the permits, allows us to know how the drainage characteristics may be affected. We also actively monitor pending rule changes from federal and state agencies, relating to water quality treatment, that could affect or modify future development plans as the drainage or treatment requirements will be changing. Miller Legg has worked closely with FXE Airport Management on the review and development order conditions and permit restrictions associated with these undeveloped and permitted parcels. In addition, our Certified Arborists have performed tree inventories. John Knox Village Campus Wide Tree Inventory - Miller Legg was selected by John Knox Village to perform arborist services and a tree inventory for the Pompano Beach campus. The tree inventory and evaluation reflected the following data to meet the requirements for City of Pompano Beach: tree species; common and scientific names; dbh (diameter at breast height) for dicot trees; clear trunk, grey wood, or overall heights for palms; canopy spread, and general health/ condition/ hazard determination as evaluated by an ISA Certified Arborist. Locations of trees were recorded using a sub meter differential global positioning satellite (dGPS). City of Homestead Biscayne- Everglades Greenway Trail - Among the services Miller Legg provided for this 3.2 mile, 12-foot-wide Biscayne Everglades Greenway shared-use trail project are landscape architectural, engineering, surveying and environmental services including preparation of FDOT- approved construction documents, design of regulatory and wayfinding signs, pavement markings, safe pedestrian push button crossing and necessary drainage within the C-103 Canal right-of-way from East Mowry Drive to SW 137th Avenue in Homestead. The scope of services was based upon a 2017 Florida Shared-use Non-Motorized Trail Agreement between the City of Homestead and FDOT. Topographic and SUE services were delivered. The scope included engineering design and permitting services for the shared-use trail, associated drainage and roadway pedestrian crossings. The firm also carried out Preliminary Natural Resource and Protected Species Investigations and documents related to designation of the Project by FDOT as a Documented Categorical Exclusion. Lake County ISA Arborist Services - Miller Legg has been retained by Lake County since 2016 as its International Arborist Association (ISA) Certified Arborist consultant to provide services including inspections of areas to identify potential hazards within the County's right-of-way, evaluation of condition of specific trees, training to Lake County staff on topics such as ISA pruning standards, diseased trees, industry standards updates, and expert testimony on behalf of the County during litigation or claims processes. Tree inventory includes DBH data collection, canopy spread and GPS location. The firm is required to be available for consultation 24 hours a day, 7 days a week and may be required to perform relevant emergency arborist services. As part of our Lake County Arborist Contract Miller Legg held training sessions for Public Works staff on proper tree trimming, utilization of and adherence to ANSI A300 pruning standards as well as health and disease observation techniques. Staff were informed that proper pruning is based on scientific principles of plant physiology. Further, the importance of proper tree trimming was discussed, in particular with regard to the very old large Laurel Oak trees commonly found in Lake County, to remove damaged, dead or structurally weak limbs. This concept was emphasized relative to improving a tree’s health and reducing the chances of damage to people or property caused by falling limbs. Lake County Arborist Projects have included the following: 1250 Gray Court, Washington Road, Lake County Administration Building, Max Hooks Road, and N. Sinclair Avenue and Sylvan Shores. Miami Beach South Beach Boardwalk Dune & Tree Survey and GIS Mapping - Miller Legg updated its previous +/- 1100 LF topographic and Coastal Construction Control Line (CCCL) survey for a FDEP Coastal Construction permit. This was part of the beach boardwalk improvements design project between Lummus Park and South Point Drive in South Beach. The topography included trees and all above ground improvements. Beach transects were established to the Mean Water Line and CCCL and Erosion Control Lines were also established. The dune vegetation survey included herbaceous, shrub and tree species. Vegetation data was collected using a sub-meter Trimble GPS unit. Maps were then created in a GIS program indicating dominant species coverage with related percentages. In addition a tree inventory for coastal tree species and associated attributes was conducted by our Certified Arborists and displayed on digital maps. Page 584.2. Qualification of Key Personnel Assigned to Engagement Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA Years of Experience: 12 Years With the Firm: 8 Registrations & Certifications: FDEP Qualified Stormwater Management Inspector, 2016 Registered Burrowing Owl Agent, FL, 2022 Certified Arborist, FL, 2021 Certificate of Personal Watercraft Operation, 2005 FDOT Intermediate Maintenance of Traffic, FL, 2022 US Sailing Level 1 Sailing Instructor, 2006 NSU OC Vessel Operator Certified, 2010 PADI Advanced Open Water Certification, 2011 Education: Bachelor of Science, Biology Fairfield University, 2008 Master of Science, Marine Biology Nova Southeastern University, 2013 Professional & Civic Activities: Member, American Fisheries Society Florida Chapter Member, Florida Association of Environmental Professionals, S. Florida Chapter Professional Member, ISA Florida Chapter Member, NSU Oceanographic Center Fisheries Laboratory Member, Pacific Island Regional Observer Program Pelagic Observer Member, Pelagic Observer Program Member, Surfrider Foundation Suncoast Chapter Member, The Wildlife Society Florida Chapter Professional Experience: Mr. Dancho is an Environmental Specialist and Certified Arborist responsible for performing investigations on biological and ecological impacts as well as tree surveys affecting the firm’s public and private sector projects. Specific responsibilities include: wetland determinations and delineations, wetland mitigation design and monitoring, environmental permitting, threatened and endangered species surveys and assessments, habitat mapping and tree inventories and arborist services. Relevant Project Experience: City of Miami Fairlawn Community Park - Under our continuing services contract with the City of Miami, Miller Legg was awarded the development of programming, pre-design/concept, design, construction document preparation and construction phase services for a new park on SW 63rd Avenue. The scope includes civil engineering, landscape architecture, certified arborist, surveying and SUE, structural, electrical and geotechnical engineering as well as permitting, opinion of probable cost and limited construction administration. The passive park will contain a shaded/fenced children's playground, dog run, shared pedestrian / bicyclist perimeter path, light bollards, benches, pedestrian pole lighting, irrigation, water fountain, bike racks, receptacles, hardscape furniture, access driveway and perimeter privacy walls. Permitting will be coordinated with the City of Miami, Miami-Dade County DERM, WASD and SFWMD. Survey services include boundary and topographic and tree inventory. Miller Legg will assist the City with the presentation of conceptual designs at Community Meetings to gather public input for a final design. City of Miami E.G. Sewell Park - Miller Legg is under contract with the City of Miami for program development, pre-design, master planning design including public involvement workshops, construction documents and construction administration services for Sewell Park. The program will be an open passive park with elements including passive walkways through park and preserve areas, pavilions, an eco trail, baywalk, hardscape, floating docks, kayak launch, seawall/living shoreline, wayfinding and historical information signage. The scope of services includes landscape architecture, irrigation, civil engineering, topographical surveying, SUE, certified arborist, structural engineering, electrical engineering, geotechnical engineering, archeological, permitting, bidding assistance and limited construction administration. Miller Legg will also conduct a Bonneted Bat survey and perform a bathymetric survey for the seawall component. The firm is assisting the City to gather community stakeholder input during the design process. Government agency permitting will be coordinated with Miami-Dade Co. DERM, WASD and SFWMD. City of Miami Beach Chase Avenue and 34th Street Shared Path - Under its continuing services agreement with the City of Miami Beach, Miller Legg was retained to provide surveying, civil engineering and landscape architecture services related to the new Chase Avenue and 34th Street shared path and roadway improvements project. The 10- ft shared use path will support the use of simultaneous pedestrian and bicycle activity. The scope of services includes topographic surveying, tree inventory, disposition and permitting; irrigation, landscape, hardscape and amenities design, site civil design development for clearing/demolition, signage and marking, paving, grading, drainage and erosion control/pollution prevention. Team subconsultants are performing geotechnical tasks (soil test borings and SFWMD exfiltration tests) and electrical engineering/site lighting. Miller Legg is also responsible for permitting coordination with the City and Miami- Matthew Dancho, MS, CA Biologist (As Needed) Page 594.2. Qualification of Key Personnel Assigned to Engagement Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA Dade DERM, as well as bidding assistance/contract administration and construction phase tasks including construction observation. City of Homestead Biscayne- Everglades Greenway Trail - Among the services Miller Legg provided for this 3.2 mile, 12-foot-wide Biscayne Everglades Greenway shared-use trail project are landscape architectural, engineering, surveying and environmental services including preparation of FDOT- approved construction documents, design of regulatory and wayfinding signs, pavement markings, safe pedestrian push button crossing and necessary drainage within the C-103 Canal right-of-way from East Mowry Drive to SW 137th Avenue in Homestead. The scope of services was based upon a 2017 Florida Shared-use Non-Motorized Trail Agreement between the City of Homestead and FDOT. Topographic and SUE services were delivered. The scope included engineering design and permitting services for the shared-use trail, associated drainage and roadway pedestrian crossings. The firm also carried out Preliminary Natural Resource and Protected Species Investigations and documents related to designation of the Project by FDOT as a Documented Categorical Exclusion. City of Fort Lauderdale Mills Pond Park Environmental Construction Observation - The City of Fort Lauderdale hired Miller Legg to provide construction observation for a freshwater wetland with tidal influence restoration project in the highly environmentally sensitive area at Mills Pond Park. Miller Legg ensured adherence to the specifications and permit criteria and prevented accidental damage to protected vegetation and resources that were present on-site. Construction of this off-site mitigation was achieved through a combination of nuisance and exotic vegetation removal and planting of over 6,600 freshwater and saltwater-tolerant trees, shrubs and groundcover at the Park. Services provided included: design, planting plans and details, permitting modifications through Broward County, South Florida Water Management District, US Army Corps of Engineers, bid specification development, construction administration, environmental monitoring, cost estimates, scheduling, sketch and legal descriptions, conservation easement coordination, construction layout, field modifications, agency coordination, outreach program, compliance and post-conservation monitoring to ensure project success. City of Oakland Park East Dog Park - To assist with the City of Oakland Park's plan to develop a 1-acre Dog Park at the existing Richard Giusti Heart Par Cours Park, Miller Legg was retained for topographic and tree surveying, SUE, engineering and landscape architecture services as well as an opinion of probable cost. The firm is providing schematic designs and renderings to provide off- street parking along NE 6th Avenue and NE 36th Street, sidewalk connectivity, modification to the existing jogging trail, dog park design for small and large dogs which includes landscape improvements, tree additions, canopy shelters, water stations, pet waste stations, benches and asphalt walking paths. This project is being performed under Miller Legg's continuing services contract. City of Tamarac Go-Forward Roadway Landscape Master Plan Update - Miller Legg provided the City of Tamarac with an update to its citywide Roadway Landscape Master Plan. The project consisted of creating a go-forward landscape roadmap guide that will be implemented for years to come. Miller Legg conducted a citywide tree inventory assessment, an evaluation of existing landscape, irrigation and hardscape conditions, an overall assessment of the existing character of the road corridors, and an opportunities and constraints analysis. The overall goal was to create a Landscape Master Plan that provides the City with typical conceptual landscape concepts, recommendations, guidelines, and implementation strategies to follow. The Master Plan was unanimously adopted by the City Commission. Doral Glades Park Wetlands Monitoring - Miller Legg provided environmental services at Doral Glades Park. The wetlands monitoring project involves wetland mitigation, site compliance review and maintenance, contractor observation and oversight, as well as pre- and post-herbicidal contractor review for treatment of invasive/exotic and nuisance plant species. In addition, this project included the submission of annual Florida Communities Trust (FCT) stewardship reports on behalf of the City. This annual report included on-site observation of required structures and facilities along with narrative and photo-documentation reporting. The project enabled City Park development and programming for the passive environmental education facility. Miller Legg also provided assessment and corrective recommendations on installed hardwood trees. Port St. Lucie Landscape Architect- Arborist for GPS Landscaping & Signs Inventory - Miller Legg was selected by the City of Port St Lucie to update its municipal Tree and Landscape Inventory using the City's on-line Tree inventory portal. The firm is responsible for inventorying new trees and landscape beds on City property to collect bed lines, genus/species, size, square footage, condition in the case of plants; genus/species, height, size, DBH, measurement, condition, replacement value in the case of trees; and location in the case of signs. Miller Legg reports on each City Entry Sign site with current entry sign, plant and tree information updates to the existing GPS database. Designated locations include City Hall, road rights-of-way, cul-de-sacs, pond areas and entry signs. Page 604.2. Qualification of Key Personnel Assigned to Engagement Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA > Years of Experience: 26 Years With the Firm: 23 Registrations & Certifications: Certified Arborist, FL, 2002 ISA Tree Risk Assessment, FL, 2021 FDEP Qualified Stormwater Management Inspector, FL, 2010 Education: Associates Degree, Engineering Broward College, 1997 Associate of Science, Wetlands Management Environmental Science Broward College, 2000 Professional & Civic Activities: Member, Florida Association of Environmental Professionals Member, International Society of Arboriculture Member, Society for Range Management, Florida Section Professional Experience: Mr. Mann is a Senior Environmental Specialist with significant experience in both public and private sector projects in Florida that focus on environmental improvements, habitat restoration, and mitigation issues. Specific services he has provided to clients include: the development and preparation of approved Florida Communities Trust Grant applications, management plans, and stewardship reports including coordination with staff to resolve scoring and site development issues for local municipalities, developing and delivering complex county, state, and federal environmental resource permit applications, and practical field experience involving environmental and conservation principles and water resource engineering as it relates to, water quality improvements, flood control, natural ecosystems, and municipal water supply. Mr. Mann is a certified arborist and provides the following consulting services to both public and private sector clients: tree species identification and inventories, tree surveys and canopy mapping, destroyed/damaged tree assessments, tree value estimates, tree grading, tree species selection for planting, mangrove trimming oversight and tree permitting. Relevant Project Experience: City of Pembroke Pines Florida Wetlandsbank - A 450-acre entrepreneurial fresh water wetland mitigation bank in Pembroke Pines. Services provided included: site planning, extensive negotiations with permitting agencies, including the US Army Corps of Engineers, South Florida Water Management District and Broward County, to secure dredge and fill, and water management permits, establishment of a mitigation credit system, design of a balanced wetland ecosystem including a wide variety of fresh water habitats and hydroperiods necessary for a dynamic self-sustaining system, extensive hydrologic studies and reviews to optimize critical hydrologic parameters, preparation of bid documents, contract administration, construction phasing, cost estimates, wildlife stress management plans, and construction inspection and post construction monitoring. In addition, a portion of the previous rock pit was backfilled to greater than 25 feet and brought up to wetlands restoration grade. Award: Grand Award for Engineering Excellence, American Council of Engineering Companies, Florida Chapter, 1998 City of Pembroke Pines West Pines Soccer Park - A 56-acre active and passive municipal park located at 196th Avenue and Pines Boulevard in the City of Pembroke Pines. This unique park's features included four soccer fields and one football facility as well as providing other active park elements with passive park facilities such as a boardwalk and 21 acres of wetlands mitigation area. Services provided by Miller Legg included civil engineering, surveying, wetlands mitigation planning, assistance with grant writing, and mitigation construction observation. Permitting was coordinated with US Army Corps of Engineers, Broward County and South Florida Water Management District. Miller Legg worked in concert with several other consultants to deliver this project. City of Plantation SR 817/University Drive Bus Stop Improvements LAP - Miller Legg was retained by the City of Plantation to assist them prepare National Environmental Policy Act (NEPA) documentation. The firm performed an environmental review of 22 existing bus stops to meet Americans with Disability Act (ADA) criteria and installation of eight new bus shelters in the City of Plantation. The work was completed under a Local Area Provider (LAP) agreement between the City of Plantation and Florida Department of Transportation (FDOT) District 4. The goal of the project was to obtain federal funding for the rehabilitation, upgrade, or addition of 30 bus shelters along three Paul Mann, CA, TRAQ Senior Environmental Specialist (As Needed) Page 614.2. Qualification of Key Personnel Assigned to Engagement Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA miles of University Drive. During the field reviews, staff recorded floral and faunal presence. The firm prepared a Type 1 Programmatic Categorical Exclusion package and coordinated with the FDOT on behalf of the City. Port St. Lucie Landscape Architect- Arborist for GPS Landscaping & Signs Inventory - Miller Legg was selected by the City of Port St Lucie to update its municipal Tree and Landscape Inventory using the City's on-line Tree inventory portal. The firm is responsible for inventorying new trees and landscape beds on City property to collect bed lines, genus/species, size, square footage, condition in the case of plants; genus/species, height, size, DBH, measurement, condition, replacement value in the case of trees; and location in the case of signs. Miller Legg reports on each City Entry Sign site with current entry sign, plant and tree information updates to the existing GPS database. Designated locations include City Hall, road rights-of-way, cul-de-sacs, pond areas and entry signs. City of Coral Springs Street Tree Replacement Program - For this street tree replacement program in the City of Coral Springs, Miller Legg developed a tree replacement flyer and program to disseminate this information to residents desiring to participate in this program. The flyer included an overview of the project as well as specific guidelines and recommendations for the tree replacement activities. The firm also coordinated approval from the City staff and assisted with its dissemination. In addition, our landscape architecture staff worked with the staff to review the applications submitted and assist in the review of plant installations facilitated by this program. City of Coral Springs Red Lichen Post Monitoring - Miller Legg performed five (5) years of required mitigation monitoring at the City of Coral Springs Red Lichen Sanctuary wetland, followed by a further three (3) years of hydrological monitoring. Miller Legg was responsible for a biannual download of hydrological data and maintenance of the existing piezometer at the City of Coral Springs Red Lichen Sanctuary wetland. Data downloaded at the wetland location was assembled and used in the preparation of a water level hydrograph. In addition general observations of the site and site photographs were collected and submitted. City of Fort Lauderdale Mills Pond Park Environmental Construction Observation - The City of Fort Lauderdale hired Miller Legg to provide construction observation for a freshwater wetland with tidal influence restoration project in the highly environmentally sensitive area at Mills Pond Park. Miller Legg ensured adherence to the specifications and permit criteria and prevented accidental damage to protected vegetation and resources that were present on-site. Construction of this off- site mitigation was achieved through a combination of nuisance and exotic vegetation removal and planting of over 6,600 freshwater and saltwater-tolerant trees, shrubs and groundcover at the Park. Services provided included: design, planting plans and details, permitting modifications through Broward County, South Florida Water Management District, US Army Corps of Engineers, bid specification development, construction administration, environmental monitoring, cost estimates, scheduling, sketch and legal descriptions, conservation easement coordination, construction layout, field modifications, agency coordination, outreach program, compliance and post- conservation monitoring to ensure project success. City of Pembroke Pines West Pines Soccer Park - A 56-acre active and passive municipal park located at 196th Avenue and Pines Boulevard in the City of Pembroke Pines. This unique park's features included four soccer fields and one football facility as well as providing other active park elements with passive park facilities such as a boardwalk and 21 acres of wetlands mitigation area. Services provided by Miller Legg included civil engineering, surveying, wetlands mitigation planning, assistance with grant writing, and mitigation construction observation. Permitting was coordinated with US Army Corps of Engineers, Broward County and South Florida Water Management District. Miller Legg worked in concert with several other consultants to deliver this project. City of Orange City Tree Inventory - Miller Legg performed a differential GPS inventory of more than 2,000 trees located within 10 City-owned properties, as well as a 1,500 SF median along Graves Avenue. Each tree inventoried had the following data collected: species common and scientific names, location coordinates, trunk diameter, overall height, canopy spread, general health/condition, and notes on overall health/condition if problems exist. General tree condition was evaluated by an ISA Certified Arborist for each tree inventoried. For each site inventoried, the resulting data was provided to the City via an aerial photograph exhibit and tree inventory table. City of Miramar - Miramar Parkway LAP Streetscape Improvements from 62nd to 64th Avenue - Miramar Parkway Streetscape Improvement project was a Local Agency Program (LAP)-funded revitalization project in the City of Miramar. The project entailed Miramar Parkway's eastern gateway segment from 62nd to 64th Avenue, approximately 1/2 mile in length. The project included intersection improvements, traffic signal modifications/upgrades and sidewalk and Florida Friendly landscape beautification throughout the project limits. Services provided included: surveying including topographic surveying, maintenance of traffic, underground utility designation, landscape architecture, hardscape design, drainage and stormwater permitting, design and management, lighting and electrical design, geotechnical design, traffic engineering, tree permitting and arborist services, as well as LAP coordination, permitting and submittal documentation. Miller Legg developed a master plan for this corridor, incorporating access management and shared commercial parking facilities to enhance the commercial viability of the corridor. Utilizing the master plan, extensive public outreach was conducted with the corridor stakeholder to establish consensus on the redevelopment and roadway plan. Page 624.2. Qualification of Key Personnel Assigned to Engagement Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA Years of Experience: 20 Years With the Firm: 19 Registrations & Certifications: FDEP Qualified Stormwater Management Inspector, FL, 2011 Education: Bachelor of Arts, Geology Hartwick College, 1993 Continuing Education: FDOT LAP Certification Webinar, 2015 FDOT Specifications Package Certification, 2020 Publications & Presentations: FLERA Annual Conference, West Lark Park: A Successful Habitat Restoration, 2011, Co-Presenter Florida Chamber Environmental Permitting Summer School Conference, Burrowing Owls: Issues Affecting Conservation of Wildlife Species, 2018, Co-Author SFAEP Annual Conference, West Lake Park: Mangroves, Seagrass and Mudflats, 2010, Co-Presenter Professional Experience: Ms. Shipley is a Senior Environmental Scientist responsible for wetland determination and delineation, wetland mitigation design and monitoring, environmental permitting, threatened and endangered species surveys and assessments, benthic surveys, coral, seagrass, and mangrove surveys and monitoring. Relevant Project Experience: City of Sunny Isles Beach Pelican Community Park - A three-acre active park site, for which Miller Legg managed landscape architecture, irrigation, engineering, surveying and architecture designs for a baseball field, recreation building, playground structure, gymnasium, and related site amenities within the City of Sunny Isles Beach. The project management team at Miller Legg received recognition from the City for their involvement in the design completion of the park. In addition, Miller Legg provided construction observation services. In addition, we also provided grant assistance to secure a Florida Recreational Development Assistant Program (FRDAP) grant for $200,000. FRDAP is a competitive grant program that provides financial assistance to local governments for development or acquisition of land for public outdoor recreational purposes. Award: Award of Merit, American Society of Landscape Architects, Florida Chapter, 2009 City of Plantation Parks & Recreation Master Plan - Miller Legg was selected to prepare the first Plantation Parks and Recreation Master Plan. The firm provided comprehensive recreation planning to create the Master Plan. The Parks and Recreation Master Plan is a tool intended to help the City of Plantation meet the current and future recreation needs of the community. The resident-driven plan serves as a source of applicable decision-making information, and establishes clear goals and actionable objectives to guide staff, advisory committees, and City Council in their work to maintain and enhance Plantation’s system of parks, recreation facilities, and programs over the next ten years. The Plan was based upon research of existing facilities and programs, recreation opportunities and needs analyses specific to City of Plantation demographics. To effectively gather and disseminate information during the planning phase, Public Outreach was an important focus of the project. Public workshops and Public Online Survey assisted in determining community recreation needs and desires. All 42 Parks and 5 Community Centers sites were reviewed, along with future expansion opportunities to accommodate program requirements. In addition, Miller Legg assisted the City to achieve its prestigious national CAPRA (Commission for Accreditation of Park and Recreation Agencies) accreditation, a demonstrated management system of best practices and measure of agency quality of operation, management and service to the community. City of Homestead Biscayne- Everglades Greenway Trail - Among the services Miller Legg provided for this 3.2 mile, 12-foot-wide Biscayne Everglades Greenway shared-use trail project are landscape architectural, engineering, surveying and environmental services including preparation of FDOT-approved construction documents, design of regulatory and wayfinding signs, pavement markings, safe pedestrian push button crossing and necessary drainage within the C-103 Canal right-of-way from East Mowry Drive to SW 137th Avenue in Homestead. The scope of services was based upon a 2017 Florida Shared-use Non-Motorized Trail Agreement between the City of Homestead and FDOT. Topographic and SUE services were delivered. The scope included engineering design and permitting services for the shared-use trail, associated drainage and roadway pedestrian crossings. The firm also carried out Preliminary Natural Resource and Protected Species Jennifer Shipley Environmental Scientist (As Needed) Page 634.2. Qualification of Key Personnel Assigned to Engagement Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA Investigations and documents related to designation of the Project by FDOT as a Documented Categorical Exclusion. City of Coral Springs Red Lichen Sanctuary - This 14-acre environmentally sensitive land (ESL) passive park site in Coral Springs includes such features as walking trails, native habitat restoration plantings, forested wetland habitats and marsh wetland habitats. Miller Legg provided biological permitting and engineering services to assist in the restoration of an upland fill area to marsh. Services provided included wetland jurisdictional verifications, WRAP and WBI assessments, mitigation design, and permitting with the US Army Corps of Engineers, the South Florida Water Management District, and Broward County Department of Planning and Environmental Protection. From 2005 to 2016, Miller Legg was responsible for a biannual download of hydrological data and maintenance of the existing piezometer at the Red Lichen Sanctuary wetland to assist the City with its review of water level drawdowns associated with utility operations. Data downloaded at the wetland location was assembled and used in the preparation of a water level hydrograph. In addition, general observations of the site and site photographs were collected and submitted. City of Tamarac Prospect Road - Landscape median corridor design for the City of Tamarac. Services provided included conceptual design through to final design documents for landscape and irrigation. Project included assistance in documents for bidding, cost estimates and coordination for a Broward Beautiful grant. City of Miramar Master Park Plan - The update of the City’s Master Park Plan involved significant research to update the existing data. Future recreational needs were outlined in this report. Additional information prepared for this project includes demographics, geographic information systems (GIS) maps, resident needs surveys, agency coordination, and public workshops. Doral Glades Park Boardwalk and Wetland Preserve - Doral Glades Park is a 25-acre recreational facility in the northeast section of the City. Both passive and active elements were featured, including playing fields, community and nature pavilions, fishing pier, walking trail and wetland boardwalk. Miller Legg provided both design and permitting services as well as wetland and boardwalk construction administration services, using GIS and surface water management support. The scope included coordination with the City on permit compliance, exotic species removal, native species and maintenance programs; value engineering and design for the boardwalk(s) and pier(s). Miller Legg developed a Wetland Mitigation Plan including GIS maps and habitat evaluation for placement of the boardwalks in ideal locations within the wetland. These Plans captured data from the original permits issued by environmental agencies DERM, SFWMD and USACOE. Further, Miller Legg prepared construction drawings for the upland boardwalk, pavilion, wetland boardwalk and fishing pier. Finally, the firm was responsible for the preparation of environmental resource permit (ERP) modification applications for boardwalk and planting in wetland areas. Amenities at the park include: kayak launch, fishing pier, lake, playground, picnic areas, boardwalks, a Green Globe Certified (LEED Silver) nature center, bike lanes, basketball courts, tennis courts and multi- use fields. City of Plantation PD&E Midtown Bridge Improvement - The goal of this City of Plantation PD&E and Design project is to evaluate and design a 2-lane divided bridge span over the SFWMD New River Canal connecting SW 17th Street in Plantation Midtown to westbound State Road 84. Phase One includes a preliminary engineering and project development (PD&E) Study which will follow FDOT PD&E standards and procedures. The Study includes environmental evaluation and public involvement. The second phase is project design and permitting. One year is scheduled for the PD&E phase and one additional year for design and permitting. Landscape architecture, environmental permitting, PD&E, Section 4(f), and environmental analysis will be performed as well as permitting coordination with the City and FDOT. Miller Legg is a subconsultant to Marlin Engineering. City of Miramar Master Park Plan - The update of the City’s Master Park Plan involved significant research to update the existing data. Future recreational needs were outlined in this report. Additional information prepared for this project includes demographics, geographic information systems (GIS) maps, resident needs surveys, agency coordination, and public workshops. City of Coral Springs Red Lichen Post Monitoring - Miller Legg performed five (5) years of required mitigation monitoring at the City of Coral Springs Red Lichen Sanctuary wetland, followed by a further three (3) years of hydrological monitoring. Miller Legg was responsible for a biannual download of hydrological data and maintenance of the existing piezometer at the City of Coral Springs Red Lichen Sanctuary wetland. Data downloaded at the wetland location was assembled and used in the preparation of a water level hydrograph. In addition general observations of the site and site photographs were collected and submitted. Pembroke Pines City Center - This project consisted of approximately 100 acre mixed use project that was the last phase of a 200 acre total development that also included multi-family and commercial land use components in Pembroke Pines. The City Center project consisted of design for a commercial and town center concept with adjacent multi- family residential components. Unique site design components included incorporation of a city park, linear 200’ wide FP&L easement that split the property, an adjacent fuel pipeline easement, as well as extensive accommodation for stormwater management systems and wetlands mitigation areas. The project included the filling of existing canals and associated governmental agency permitting. Services included environmental resource permitting, mitigation design, mitigation construction, maintenance observation, remedial plan development, mitigation monitoring and surveying. Page 644.2. Qualification of Key Personnel Assigned to Engagement Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA Years of Experience: 23 Years With the Firm: 6 Registrations & Certifications: Registered Professional Engineer, FL, 2003 Education: Bachelor of Science, Civil Engineering University of Central Florida, 1997 Professional & Civic Activities: Member, American Society of Civil Engineers Member, Commercial Real Estate Development Institute Member, Florida Engineering Society Member, International Council of Shopping Centers Member, Urban Land Institute Professional Experience: Mr. Mojica has extensive project management, design and permitting experience in Florida and the Caribbean. He has provided civil engineering design and management services to both private and public sector clients. As Regional Engineering Manager, Mr. Mojica's responsibilities include preparation of proposals, negotiation of engineering contracts, client relations, project reporting, scheduling, budgeting, management of technical staff and subconsultants, design, and permitting. He is highly skilled in CAD/Civil 3D, ICPR and PONDS software. Relevant Project Experience: City of Coral Gables War Memorial Youth Center Landscape & Engineering - This City of Coral Gables 7-acre War Memorial Youth Center in Miami Dade County represents a living memorial to Coral Gables World War II veterans. The project includes improvements to multi- purpose athletic fields. Miller Legg was responsible for the landscape architecture, civil engineering design and permitting of the improvement program. Specific improvements included athletic field drainage, re-sodding with Bermuda "Celebration" turf and irrigation design. The irrigation system ties into a non- potable well system. Drainage improvements consist of subsurface field improvements that integrate with the existing exfiltration and subsurface drainage systems. Additional services provided include: design development, final construction documents, and construction administration. Miller Legg collaborated with MC Harry Associates on this project. City of Miami Fairlawn Community Park - Under our continuing services contract with the City of Miami, Miller Legg was awarded the development of programming, pre-design/concept, design, construction document preparation and construction phase services for a new park on SW 63rd Avenue. The scope includes civil engineering, landscape architecture, certified arborist, surveying and SUE, structural, electrical and geotechnical engineering as well as permitting, opinion of probable cost and limited construction administration. The passive park will contain a shaded/fenced children's playground, dog run, shared pedestrian / bicyclist perimeter path, light bollards, benches, pedestrian pole lighting, irrigation, water fountain, bike racks, receptacles, hardscape furniture, access driveway and perimeter privacy walls. Permitting will be coordinated with the City of Miami, Miami-Dade County DERM, WASD and SFWMD. Survey services include boundary and topographic and tree inventory. Miller Legg will assist the City with the presentation of conceptual designs at Community Meetings to gather public input for a final design. City of Homestead Biscayne- Everglades Greenway Trail - Among the services Miller Legg provided for this 3.2 mile, 12-foot-wide Biscayne Everglades Greenway shared-use trail project are landscape architectural, engineering, surveying and environmental services including preparation of FDOT- approved construction documents, design of regulatory and wayfinding signs, pavement markings, safe pedestrian push button crossing and necessary drainage within the C-103 Canal right-of-way from East Mowry Drive to SW 137th Avenue in Homestead. The scope of services was based upon a 2017 Florida Shared-use Non-Motorized Trail Agreement between the City of Homestead and FDOT. Topographic and SUE services were delivered. The scope included engineering design and permitting services for the shared-use trail, associated drainage and roadway pedestrian crossings. The firm also carried out Preliminary Natural Resource and Protected Species Investigations and documents related to Joaquin Mojica, PE Project Engineer (5% Availability) Page 654.2. Qualification of Key Personnel Assigned to Engagement Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA designation of the Project by FDOT as a Documented Categorical Exclusion. City of Cocoa Beach CRA Minutemen Causeway - Minutemen Causeway is the “main street” within the Cocoa Beach Central Business District, providing a front door to City Hall and direct access to the beach. Over the last 30 years, development within the Minutemen Causeway corridor included a mix of commercial, residential, and lodging properties. This development drastically increased the impervious conditions of the corridor and significantly impacted the stormwater system within the area, causing regular flooding issues. Miller Legg’s solutions for the Minutemen Causeway project was a holistic design approach to improve the stormwater / drainage issues, while invigorating the area’s economy by creating a pedestrian- oriented beachfront promenade and streetscapes. The project consisted of significant landscape beautification and geometric modifications to the corridor to promote a pedestrian-friendly environment and to stimulate economic development. In conjunction with the redevelopment, the project included low- impact stormwater facilities to meet the Total Maximum Daily Load reduction requirements, as outlined within the Indian River Lagoon Basin Management Action Plan. These stormwater improvements included pervious paver sidewalks and parallel parking, bio-swales with native vegetation, and underground stormwater infiltration facilities with nutrient absorption materials. The entire project was a City pilot program for Low Impact Design (LID) and Best Management Practices (BMP) for stormwater management. Utilizing this innovative approach, this project was able to secure significant funding from the State, including almost $5 million from the Florida Department of Environmental Protection. City of Lauderhill Sports Park - Miller Legg was retained by the City of Lauderhill to provide civil engineering design, stormwater permitting, landscape architecture, irrigation design, construction specifications and bidding assistance services for proposed amenities improvements at the 12-acre Lauderhill Sports Park. Replacement of the baseball field and cricket pitch natural grass with synthetic turf and the football scoreboard replacement tasks have been finalized. Miller Legg has also completed design of the playground area wood chip surface conversion to synthetic turf, playground shade, modifications to portions of the fitness trail and the addition of new fitness stations trail and exercise equipment. City of Oakland Park East Dog Park - To assist with the City of Oakland Park's plan to develop a 1-acre Dog Park at the existing Richard Giusti Heart Par Cours Park, Miller Legg was retained for topographic and tree surveying, SUE, engineering and landscape architecture services as well as an opinion of probable cost. The firm is providing schematic designs and renderings to provide off- street parking along NE 6th Avenue and NE 36th Street, sidewalk connectivity, modification to the existing jogging trail, dog park design for small and large dogs which includes landscape improvements, tree additions, canopy shelters, water stations, pet waste stations, benches and asphalt walking paths. This project is being performed under Miller Legg's continuing services contract. City of Miami Morningside Park Tennis Center - The City of Miami Morningside Park created an expanded and improved tennis facility at this 42-acre Park. The project included improvements to an existing seven courts that had experienced degradation due to drainage and soil stabilization issues. A new court layout was developed to increase the facility to eight lighted courts and a warm- up training wall amenity. Other tennis improvements included upgraded lighting, fencing ad shaded bench area. A central courtyard was also developed as a key element of the project design. This courtyard created an inviting area for players and spectators to gather before and after matches. A themed paver field with lush landscaping that embraces large existing ficus trees creates a pleasant gathering space not previously found at Morningside Park, and helps establish it as a premier public tennis destination in the City of Miami. Miller Legg services included civil engineering, landscape architecture, permitting and limited construction administration to assist the City in the bidding, observation and certification of the project improvements. Arborist services included evaluating existing trees for health, longevity and relocation prospects. Once relocated, the trees were monitored for ongoing wellbeing on site. Apart from the City, other agencies with jurisdiction for this project include Miami-Dade County Department of Environmental Resources (DERM) and South Florida Water Management District (SFWMD). Received the Facility Showcase award by the Florida Recreation & Park Association. Miller Legg secured this project under the firm's Continuing Services Agreement with the City of Miami. City of Miami Museum Park Baywalk Phase 3 – Under our Miscellaneous Landscape Architectural Services contract, Miller Legg provided landscape architecture, civil engineering, lighting/electrical engineering, surveying, permitting and limited construction administration services for the Miami Baywalk Phase 3 Project. Permitting for project improvements was provided through the City of Miami, Miami-Dade County and South Florida Water Management District. Underground utility designation for electric and drainage utilities was performed. The project is a 1/4 mile pedestrian-oriented urban waterfront park and promenade on Biscayne Bay, located adjacent to the east coast greenway. It provides a unique open space that links the American Airlines Arena, Biscayne Boulevard, and Museum Park. The Baywalk design includes custom native stone benches, extensive paver pedestrian spaces, salt-tolerant tropical plantings, as well as themed lighting and site amenities. Due to historic maritime activities in the project area, soil conditions were addressed through the design of unique drainage facilities that minimized potential groundwater impacts. The Baywalk design solution also improved visibility and lighting in the area to discourage vagrancy issues that existed. The planting design not only enhanced aesthetics, but also buffered unsightly adjacent parking and utility areas and minimized exposed surfaces that had been subject to graffiti. Page 664.2. Qualification of Key Personnel Assigned to Engagement Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA Years of Experience: 39 Years With the Firm: 6 Registrations & Certifications: Registered Professional Engineer, FL, 1985 Education: Bachelor of Science, Civil Engineering Technology Florida International University, 1981 Associate of Science, Civil Technology Nassau Community College, 1976 Continuing Education: Design of Infiltration & Extended Detention Basins, 2018 Design of Sand Filters & Bioretention Systems, 2018 Floodplain Engineering, 2018 Forensic Engineering - Failure Analysis of Metallic Materials, 2016 Horizontal Curve Safety, 2016 Metallurgical & Mechanical Failures, 2016 Roundabout Geometric Design, 2016 Professional Experience: Mr. Schipske has more than three decades of experience as a civil engineer with a focus on land development, design and construction in South Florida. He has worked on multiple commercial, industrial and residential projects involving production and project management across various technical disciplines. In addition, he spent 3 years as a senior engineering and construction manager for an international firm providing camp and logistics construction services at Kandahar Airfield in Afghanistan. Prior to joining Miller Legg, Mr. Schipske was a founding principal of two engineering firms and has held senior positions at various civil engineering and land development firms in South Florida. Relevant Project Experience: City of Lauderhill NW Quadrant Drainage Improvements - Miller Legg provided to the City of Lauderhill site civil engineering, preparation of materials, construction specifications on engineering plans, editing City front end documents, bidding assistance and is providing construction administration for the proposed construction of a drainage culvert connecting City Canals 28 and 37 crossing 50th Street, and construction of a positive drainage system trunk system on 82nd Avenue with branches on 44th Court through 47th Court discharging into City Canal 27. Construction documents included storm drainage and paving restoration improvements, paving, grading, signing and marking, demolition and storm drainage system. This project was issued under our continuing services contract with the City. City of Lauderhill Sports Park - Miller Legg was retained by the City of Lauderhill to provide civil engineering design, stormwater permitting, landscape architecture, irrigation design, construction specifications and bidding assistance services for proposed amenities improvements at the 12-acre Lauderhill Sports Park. Replacement of the baseball field and cricket pitch natural grass with synthetic turf and the football scoreboard replacement tasks have been finalized. Miller Legg has also completed design of the playground area wood chip surface conversion to synthetic turf, playground shade, modifications to portions of the fitness trail and the addition of new fitness stations trail and exercise equipment. City of Miramar Historic Public Safety Complex - The City of Miramar replaced the Civic Center and Child Care building with a new one-story 24,000 SF building to accommodate its police substation, storage, administrative and other law enforcement and public safety facilities, in addition to a surface parking lot for safety vehicles. The new building was certified Gold LEED certification. Miller Legg provided civil engineering design, permitting and construction administration services as part of the Architects Design Group team. Government permitting included the City of Miramar, Broward County and FDEP. The firm also provided LEED certification and value engineering review services. City of Coral Springs Forest Hills Boulevard Pedestrian Lighting - Miller Legg provided pedestrian lighting analysis and design plans for the Forest Hills Boulevard roadway loop starting and ending at NW 27th Street in the City of Coral Springs. A right-of-way survey was also performed. This segment of Forest Hills Boulevard is approximately 1.5 miles in length. City of Cocoa Beach CRA Minutemen Causeway - Minutemen Causeway is the “main street” within the Cocoa Beach Central Business District, providing a front door to City Hall and direct access to the beach. Over the last 30 years, development within the Minutemen Causeway corridor included a mix of commercial, residential, and William Schipske, PE Quality Assurance / Quality Control (As Needed) Page 674.2. Qualification of Key Personnel Assigned to Engagement Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA lodging properties. This development drastically increased the impervious conditions of the corridor and significantly impacted the stormwater system within the area, causing regular flooding issues. Miller Legg’s solutions for the Minutemen Causeway project was a holistic design approach to improve the stormwater / drainage issues, while invigorating the area’s economy by creating a pedestrian- oriented beachfront promenade and streetscapes. The project consisted of significant landscape beautification and geometric modifications to the corridor to promote a pedestrian-friendly environment and to stimulate economic development. In conjunction with the redevelopment, the project included low-impact stormwater facilities to meet the Total Maximum Daily Load reduction requirements, as outlined within the Indian River Lagoon Basin Management Action Plan. These stormwater improvements included pervious paver sidewalks and parallel parking, bio-swales with native vegetation, and underground stormwater infiltration facilities with nutrient absorption materials. The entire project was a City pilot program for Low Impact Design (LID) and Best Management Practices (BMP) for stormwater management. Utilizing this innovative approach, this project was able to secure significant funding from the State, including almost $5 million from the Florida Department of Environmental Protection. School Board of Broward County (SBBC) Cooper City High School Fire Loop Main - Miller Legg is providing civil and surveying services for the improvement of an existing fire loop main at Cooper City High School. Surveying services consist of topographic and underground utility location designation. The civil scope covers fire main site work to serve four campus buildings and includes agency approvals, bidding assistance and final engineering plan development including associated restoration details. The firm is also providing construction administration. This project is part of the SBBC SMART Renovations program. City of Miramar Historic Public Safety Complex - The City of Miramar replaced the Civic Center and Child Care building with a new one-story 24,000 SF building to accommodate its police substation, storage, administrative and other law enforcement and public safety facilities, in addition to a surface parking lot for safety vehicles. The new building was certified Gold LEED certification. Miller Legg provided civil engineering design, permitting and construction administration services as part of the Architects Design Group team. Government permitting included the City of Miramar, Broward County and FDEP. The firm also provided LEED certification and value engineering review services. City of West Palm Beach 32nd/33rd Streets Water Main Improvements - Miller Legg provided surveying, underground utility locates, geotechnical engineering, civil engineering design and bidding assistance services for a 2,700 LF water and 2,000 LF gravity sewer 8" water main replacement project on 32nd Street and 33rd Street from Floral Avenue to N. Flagler Drive and on N. Flagler Drive from 32nd Street to 35th Street in the historic Northwood Shores district. The existing water mains were transite, undersized, and had reached the end of their useful life. The Basis of Design Report (BODR) and development of 30% plan scope involved the assessment of water main replacement, sanitary sewer replacement/relocation (from rear yard to street on 2 streets) and evaluation of storm drainage improvements. The 1/4 mile project is located approx. 6,850 ft. north of Palm Beach Lakes Boulevard on the west side of N. Flagler Drive. Public outreach with affected residents took place and their concerns documented in advance of the construction phase. This project was completed under the firm's multi-year City of West Palm Beach General Engineering Services contract. City of West Palm Beach Gregory Road Green Streets LID Sanitary Sewer & Stormwater - The City of West Palm Beach requested Miller Legg to provide professional engineering, landscape architecture, surveying and construction administration services for the design and bidding assistance of a stormwater management and drainage improvements project in an existing residential neighborhood. The project involved the installation of +/- 700 LF of exfiltration trench including four (4) bioretention cell modules which provided opportunities for various Low Impact Development (LID) best management practices to reduce stormwater runoff and nuisance flooding. LID implementation was facilitated by the installation of bioretention in the bumpouts on Gregory Road, and nuisance flooding decreased through driveway modifications and speed control devices. The project is located along Gregory Road and Gregory Place between S. Olive Avenue and S. Flagler Drive. Miller Legg provided construction phase services consisting of bi-monthly meetings with City and contractors, construction observation site visits, contractor change order responses, minor fieldwork changes, shop drawing and sample review, special inspections or testing, as built review and approval, contractor pay application recommendations and completion document review. Miller Legg also conducted a public outreach meeting prior to the start of construction. This project was completed under the firm's multi-year General Engineering Services contract. Page 684.2. Qualification of Key Personnel Assigned to Engagement Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA Years of Experience: 32 Years With the Firm: 4 Registrations & Certifications: Registered Professional Engineer, FL, 1996 Education: Bachelor of Science, Engineering University of Florida, 1990 Professional & Civic Activities: Past President, Florida Engineering Society - Calusa Chapter Professional Experience: Mr. Pellerito has extensive experience and expertise in both small and large- scale municipal and private sector, high- complexity infrastructure projects. Peter has successfully led multidisciplinary teams in planning and design on a wide range of civil engineering projects. His project experience encompasses soil and groundwater remediation; water treatment and wastewater pre-treatment systems; water and wastewater pump stations and transmission lines; site planning; earthwork; drainage systems; paving and grading; erosion control / stormwater pollution prevention; roadway design and specifications. He is proficient in Civil 3D, Traffic Impact Statement analysis, open channel flow modeling, and lift station design. Relevant Project Experience: City of Miramar Historic Public Safety Complex - The City of Miramar replaced the Civic Center and Child Care building with a new one-story 24,000 SF building to accommodate its police substation, storage, administrative and other law enforcement and public safety facilities, in addition to a surface parking lot for safety vehicles. The new building was certified Gold LEED certification. Miller Legg provided civil engineering design, permitting and construction administration services as part of the Architects Design Group team. Government permitting included the City of Miramar, Broward County and FDEP. The firm also provided LEED certification and value engineering review services. City of West Palm Beach Gregory Road Green Streets LID Sanitary Sewer & Stormwater - The City of West Palm Beach requested Miller Legg to provide professional engineering, landscape architecture, surveying and construction administration services for the design and bidding assistance of a stormwater management and drainage improvements project in an existing residential neighborhood. The project involved the installation of +/- 700 LF of exfiltration trench including four (4) bioretention cell modules which provided opportunities for various Low Impact Development (LID) best management practices to reduce stormwater runoff and nuisance flooding. LID implementation was facilitated by the installation of bioretention in the bumpouts on Gregory Road, and nuisance flooding decreased through driveway modifications and speed control devices. The project is located along Gregory Road and Gregory Place between S. Olive Avenue and S. Flagler Drive. Miller Legg provided construction phase services consisting of bi-monthly meetings with City and contractors, construction observation site visits, contractor change order responses, minor fieldwork changes, shop drawing and sample review, special inspections or testing, as built review and approval, contractor pay application recommendations and completion document review. Miller Legg also conducted a public outreach meeting prior to the start of construction. This project was completed under the firm's multi-year General Engineering Services contract. Hollywood Beach Golf Course and Club House - Miller Legg is on the architecture team to provide civil engineering design services for the 104- acre 18-hole Hollywood Beach Golf Course project which includes the design of a new golf course clubhouse and parking lot, golf course remodeling and accessory buildings within the parcel. The project also plans to accommodate approximately 8,800 LF of perimeter greenway / pathway. The firm is assisting with the development of the final programming and conceptual plan, including utility map, as-builts and existing site condition research as well as preparation of schematic design for tree, plant beds and hardscape locations. Civil design for the Clubhouse and Parking lot Peter Pellerito, PE Project Engineer (As Needed) Page 694.2. Qualification of Key Personnel Assigned to Engagement Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA will include clearing/demolition, geometry, signage and marking, utility, paving, grading and drainage plans as well as construction details. The design will incorporate Crime Prevention Through Environmental Design (CPTED) principles. A paving, grading and drainage plan will also be provided for the proposed maintenance barn. Permitting will be coordinated with the City of Hollywood, Broward County and South Florida Water Management District. The scope includes preparation of a stormwater report for the project. Miller Legg will assist with construction phase services including civil construction administration. Town of Davie Governor Leroy Collins Farm Park - The new Governor Leroy Collins Farm Park 80- acre parcel was purchased in 2008 through a combination of funds from Davie District 4 open space bonds, Broward County, the Farm Bureau and the Florida Communities Trust Fund. The first phase of the park will consist of 20-acres of development and will include an educational center, riding arena, stables, farmers market and playground. Located east of I-75, the park is being built to preserve the rural lifestyle of the Town of Davie. Miller Legg is providing civil engineering, surveying, landscape architecture, and environmental services as part of the MC Harry team. The park will provide volunteer opportunities, farm tours, field trips, summer camps, community gardens, and equestrian programs for the special needs population. Miller Legg's civil engineering scope includes earthwork analysis; paving, grading and drainage; water and sanitary sewer, pavement marking and signage, stormwater pollution prevention; offsite improvements; phasing plans, permitting through the Town of Davie, Central Broward Water Control District, City of Sunrise, Florida Department of Environmental Protection, Broward County Environmental Protections and South Florida Water Management District; and construction administration. The wetlands scope includes wetlands due diligence, and the landscape architecture scope includes planting design, irrigation design and pedestrian and equestrian trails. Surveying services consisted of a topographic and tree survey. City of Miramar Historic Public Safety Complex - The City of Miramar replaced the Civic Center and Child Care building with a new one-story 24,000 SF building to accommodate its police substation, storage, administrative and other law enforcement and public safety facilities, in addition to a surface parking lot for safety vehicles. The new building was certified Gold LEED certification. Miller Legg provided civil engineering design, permitting and construction administration services as part of the Architects Design Group team. Government permitting included the City of Miramar, Broward County and FDEP. The firm also provided LEED certification and value engineering review services. City of West Palm Beach 32nd/33rd Streets Water Main Improvements - Miller Legg provided surveying, underground utility locates, geotechnical engineering, civil engineering design and bidding assistance services for a 2,700 LF water and 2,000 LF gravity sewer 8" water main replacement project on 32nd Street and 33rd Street from Floral Avenue to N. Flagler Drive and on N. Flagler Drive from 32nd Street to 35th Street in the historic Northwood Shores district. The existing water mains were transite, undersized, and had reached the end of their useful life. The Basis of Design Report (BODR) and development of 30% plan scope involved the assessment of water main replacement, sanitary sewer replacement/relocation (from rear yard to street on 2 streets) and evaluation of storm drainage improvements. The 1/4 mile project is located approx. 6,850 ft. north of Palm Beach Lakes Boulevard on the west side of N. Flagler Drive. Public outreach with affected residents took place and their concerns documented in advance of the construction phase. This project was completed under the firm's multi-year City of West Palm Beach General Engineering Services contract. City of West Palm Beach Gregory Road Green Streets LID Sanitary Sewer & Stormwater - The City of West Palm Beach requested Miller Legg to provide professional engineering, landscape architecture, surveying and construction administration services for the design and bidding assistance of a stormwater management and drainage improvements project in an existing residential neighborhood. The project involved the installation of +/- 700 LF of exfiltration trench including four (4) bioretention cell modules which provided opportunities for various Low Impact Development (LID) best management practices to reduce stormwater runoff and nuisance flooding. LID implementation was facilitated by the installation of bioretention in the bumpouts on Gregory Road, and nuisance flooding decreased through driveway modifications and speed control devices. The project is located along Gregory Road and Gregory Place between S. Olive Avenue and S. Flagler Drive. Miller Legg provided construction phase services consisting of bi-monthly meetings with City and contractors, construction observation site visits, contractor change order responses, minor fieldwork changes, shop drawing and sample review, special inspections or testing, as built review and approval, contractor pay application recommendations and completion document review. Miller Legg also conducted a public outreach meeting prior to the start of construction. This project was completed under the firm's multi-year General Engineering Services contract. City of West Palm Beach WPB Omar Road Improvements - Miller Legg provided surveying and engineering services associated with analysis of the existing drainage system from Omar Road north along Parker Avenue and west to Belvedere Road and I-95. This road experiences significant flooding during short duration high intensity storm events. Along with our surveying and geotechnical team members, the firm evaluated contributing factors, provided potential mitigation solutions and an opinion of probable costs for such prospective alternatives. This project was completed under the firm's multi- year General Engineering Services contract. Page 704.2. Qualification of Key Personnel Assigned to Engagement Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA Years of Experience: 28 Years With the Firm: 4 Registrations & Certifications: Registered Professional Engineer, FL, 2005 Education: Bachelor of Science, Civil Engineering Florida International University, 1994 Professional Experience: Mr. Harrelson has over 28 years of design and management experience in utility design, municipal engineering, roadway design, land development and construction management. He is highly organized, motivated and technically proficient with engineering designs, engineering programs such as WaterCad, AutoCad, and many drainage design software programs. He has significant experience leading large and high profile projects within Miami-Dade, Broward and Palm Beach Counties, which include design, permitting and construction management. Relevant Project Experience: City of Homestead Biscayne- Everglades Greenway Trail - Among the services Miller Legg provided for this 3.2 mile, 12-foot-wide Biscayne Everglades Greenway shared-use trail project are landscape architectural, engineering, surveying and environmental services including preparation of FDOT- approved construction documents, design of regulatory and wayfinding signs, pavement markings, safe pedestrian push button crossing and necessary drainage within the C-103 Canal right-of-way from East Mowry Drive to SW 137th Avenue in Homestead. The scope of services was based upon a 2017 Florida Shared-use Non-Motorized Trail Agreement between the City of Homestead and FDOT. Topographic and SUE services were delivered. The scope included engineering design and permitting services for the shared-use trail, associated drainage and roadway pedestrian crossings. The firm also carried out Preliminary Natural Resource and Protected Species Investigations and documents related to designation of the Project by FDOT as a Documented Categorical Exclusion. City of Miami Gardens Rolling Oaks Regional Park - Renovations of Rolling Oaks Regional Park include construction of a new one-story 4,000 SF recreation building, renovated restroom facilities, expansion of walking trail with lighting, distance marker, and exercise stations, new pavilions, new parking lot, refurbished basketball and tennis courts, new fencing, new shaded playgrounds, new landscaping and irrigation, addition of horseshoe pits, sand volleyball, mini golf and splashpad, and video system and WIFI. Miller Legg is providing civil engineering, landscape architecture and surveying services for this 7-acre park as a subconsultant to Synalovski, Romanik and Saye Architects. The civil scope includes design of a lift station and on- site force main extension to service the proposed Welcome Center. An arborist assessment of existing trees and palms was carried out as part of the landscape architecture services. City of Oakland Park East Dog Park - To assist with the City of Oakland Park's plan to develop a 1-acre Dog Park at the existing Richard Giusti Heart Par Cours Park, Miller Legg was retained for topographic and tree surveying, SUE, engineering and landscape architecture services as well as an opinion of probable cost. The firm is providing schematic designs and renderings to provide off- street parking along NE 6th Avenue and NE 36th Street, sidewalk connectivity, modification to the existing jogging trail, dog park design for small and large dogs which includes landscape improvements, tree additions, canopy shelters, water stations, pet waste stations, benches and asphalt walking paths. This project is being performed under Miller Legg's continuing services contract. City of Pembroke Pines West Pines Soccer Park - A 56-acre active and passive municipal park located at 196th Avenue and Pines Boulevard in the City of Pembroke Pines. This unique park's features included four soccer fields and one football facility as well as providing other active park elements with passive park facilities such as a boardwalk and 21 acres of wetlands mitigation area. Glen Harrelson, PE Project Engineer (As Needed) Page 714.2. Qualification of Key Personnel Assigned to Engagement Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA Services provided by Miller Legg included civil engineering, surveying, wetlands mitigation planning, assistance with grant writing, and mitigation construction observation. Permitting was coordinated with US Army Corps of Engineers, Broward County and South Florida Water Management District. Miller Legg worked in concert with several other consultants to deliver this project. City of Miramar Historic Public Safety Complex - The City of Miramar replaced the Civic Center and Child Care building with a new one-story 24,000 SF building to accommodate its police substation, storage, administrative and other law enforcement and public safety facilities, in addition to a surface parking lot for safety vehicles. The new building was certified Gold LEED certification. Miller Legg provided civil engineering design, permitting and construction administration services as part of the Architects Design Group team. Government permitting included the City of Miramar, Broward County and FDEP. The firm also provided LEED certification and value engineering review services. City of Plantation Police Department Firing Range - Miller Legg provided survey, civil and construction administration for the City of Plantation Police Department Firing Range project. Project scope included topographic and tree survey, civil engineering construction documentation preparation, regulatory agency construction document permitting, coordination with project MEP and structural engineers, as well as bidding assistance and contract administration for this approximately 1/2 acre project. The scope included regulatory agency construction document permitting for drainage improvements, sanitary sewer, potable water and fire protection service line and building department review as necessary. This work was performed as a subconsultant to Architects Design Group (ADG). City of Miramar Ansin Sports Complex Engineering Analysis - The City of Miramar retained Miller Legg to perform a site engineering analysis of the existing lake at the Ansin Sports Complex to determine whether the lake can be filled to provide additional buildable area on the site. The scope of services involved analysis of the existing stormwater management system and coordination with the relevant permitting agencies; South Broward Drainage District and South Florida Water Management District. Miller Legg has also prepared boundary, topographic and tree surveys at the site. City of Miami Gardens Rolling Oaks Regional Park - Renovations of Rolling Oaks Regional Park include construction of a new one-story 4,000 SF recreation building, renovated restroom facilities, expansion of walking trail with lighting, distance marker, and exercise stations, new pavilions, new parking lot, refurbished basketball and tennis courts, new fencing, new shaded playgrounds, new landscaping and irrigation, addition of horseshoe pits, sand volleyball, mini golf and splashpad, and video system and WIFI. Miller Legg is providing civil engineering, landscape architecture and surveying services for this 7-acre park as a subconsultant to Synalovski, Romanik and Saye Architects. The civil scope includes design of a lift station and on- site force main extension to service the proposed Welcome Center. An arborist assessment of existing trees and palms was carried out as part of the landscape architecture services. School Board of Broward County (SBBC) Cooper City High School Fire Loop Main - Miller Legg is providing civil and surveying services for the improvement of an existing fire loop main at Cooper City High School. Surveying services consist of topographic and underground utility location designation. The civil scope covers fire main site work to serve four campus buildings and includes agency approvals, bidding assistance and final engineering plan development including associated restoration details. The firm is also providing construction administration. This project is part of the SBBC SMART Renovations program. City of Delray Beach Pompey Park Community Center and Campus Design - Miller Legg is providing surveying, SUE, civil engineering, landscape architecture, permitting and construction phase services associated with the design of Pompey Park Community Center and Campus in Delray Beach. Surveying services consist of specific service and topographic surveys; subsurface utility engineering, including vacuum excavations. Landscape architecture scope elements are associated with design of planting, irrigation, hardscape, site amenities, two (2) playgrounds, baseball fields (relocation and restoration). A tree inventory will be conducted by a firm certified arborist. Schematic design tasks include due diligence, code, programming, site engineering, landscape and hardscape schematic design verification. Miller Legg will assist with community outreach and relevant City agency design review presentations throughout the process. Permitting coordination will be conducted with the City Engineering and Water and Sewer departments, Lake Worth Drainage District and Palm Beach County Health Department. City of Dania Beach Southeast Drainage Improvements Phase 2 - Miller Legg is providing civil engineering, permitting and landscape architecture services for this drainage improvement project to improve current flooding issues at the 103-acre neighborhood bounded by SE 3rd Street to the North, SE 2 Ave to the West, SE 7 Street to the South and SE 5th Avenue to the East. Drainage solutions include pump stations, drainage wells, exfiltration trenches, etc. to reduce flooding, including duration and severity, reduce neighborhood impacts and mitigate project costs. Miller Legg is a subconsultant to WSP USA. Page 724.2. Qualification of Key Personnel Assigned to Engagement Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA Years of Experience: 9 Years With the Firm: 5 Registrations & Certifications: Registered Professional Engineer, FL, 2017 Education: Bachelor of Science, Civil Engineering University of Central Florida, 2012 Professional & Civic Activities: Member, American Society of Civil Engineers Member, Construction Association of South Florida Professional Experience: Mr. Andreoni is a Project Engineer working for a variety of clients such as municipalities, higher education and the private sector. His experience includes civil engineering services specifically in the preparation of site plans, paving, grading, and drainage plans, signing and marking plans, water and sewer plans, stormwater pollution prevention plans, and permitting. Prior to joining Miller Legg, he worked as a Project Manager/Engineer and Staff Engineer at materials testing and inspection firms in South Florida. Relevant Project Experience: City of Miami Museum Park Baywalk Phase 3 - Miller Legg provided landscape architecture, civil engineering, lighting/electrical engineering, surveying, permitting and limited construction administration services for the Miami Baywalk Phase 3 Project. Permitting for project improvements was provided through the City of Miami, Miami-Dade County and South Florida Water Management District. Underground utility designation for electric and drainage utilities was performed.The project is a 1/4 mile pedestrian-oriented urban waterfront park and promenade on Biscayne Bay, located adjacent to the east coast greenway. It provides a unique open space that links the American Airlines Arena, Biscayne Boulevard, and Museum Park. The Baywalk design includes custom native stone benches, extensive paver pedestrian spaces, salt-tolerant tropical plantings, as well as themed lighting and site amenities. Due to historic maritime activities in the project area, soil conditions were addressed through the design of unique drainage facilities that minimized potential groundwater impacts. The Baywalk design solution also improved visibility and lighting in the area to discourage vagrancy issues that existed. The planting design not only enhanced aesthetics, but also buffered unsightly adjacent parking and utility areas and minimized exposed surfaces that had been subject to graffiti. This project was performed under our Miscellaneous Landscape Architectural Services contract. City of Miramar Historic Public Safety Complex - The City of Miramar replaced the Civic Center and Child Care building with a new one-story 24,000 SF building to accommodate its police substation, storage, administrative and other law enforcement and public safety facilities, in addition to a surface parking lot for safety vehicles. The new building was certified Gold LEED certification. Miller Legg provided civil engineering design, permitting and construction administration services as part of the Architects Design Group team. Government permitting included the City of Miramar, Broward County and FDEP. The firm also provided LEED certification and value engineering review services. City of Lauderhill Sports Park - Miller Legg was retained by the City of Lauderhill to provide civil engineering design, stormwater permitting, landscape architecture, irrigation design, construction specifications and bidding assistance services for proposed amenities improvements at the 12-acre Lauderhill Sports Park. Replacement of the baseball field and cricket pitch natural grass with synthetic turf and the football scoreboard replacement tasks have been finalized. Miller Legg has also completed design of the playground area wood chip surface conversion to synthetic turf, playground shade, modifications to portions of the fitness trail and the addition of new fitness stations trail and exercise equipment. City of Lauderhill NW Quadrant Drainage Improvements - Miller Legg provided to the City of Lauderhill site civil engineering, preparation of materials, construction specifications on engineering plans, editing City front end Christopher Andreoni, PE Project Engineer (As Needed) Page 734.2. Qualification of Key Personnel Assigned to Engagement Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA documents, bidding assistance and is providing construction administration for the proposed construction of a drainage culvert connecting City Canals 28 and 37 crossing 50th Street, and construction of a positive drainage system trunk system on 82nd Avenue with branches on 44th Court through 47th Court discharging into City Canal 27. Construction documents included storm drainage and paving restoration improvements, paving, grading, signing and marking, demolition and storm drainage system. This project was issued under our continuing services contract with the City. City of Fort Lauderdale Sailboat Bend Traffic Calming Improvements - This project was conducted under the firm's traffic and transportation engineering continuing services contract with the City of Fort Lauderdale. Miller Legg developed traffic calming plans for the Sailboat Bend residential historic district. The scope of services entailed preparation of preliminary documentation and conceptual drawings drawn from research and data collected including traffic control device placement locations; generation of draft roadway and traffic calming design, specifications and quantity tabulation, leading to preparation of final traffic calming plans based on comments and input from the City, maintaining agency and the contractor. City of Oakland Park East Dog Park - To assist with the City of Oakland Park's plan to develop a 1-acre Dog Park at the existing Richard Giusti Heart Par Cours Park, Miller Legg was retained for topographic and tree surveying, SUE, engineering and landscape architecture services as well as an opinion of probable cost. The firm is providing schematic designs and renderings to provide off- street parking along NE 6th Avenue and NE 36th Street, sidewalk connectivity, modification to the existing jogging trail, dog park design for small and large dogs which includes landscape improvements, tree additions, canopy shelters, water stations, pet waste stations, benches and asphalt walking paths. This project is being performed under Miller Legg's continuing services contract. City of Oakland Park NE 12th Terrace Streetscape Improvements - Miller Legg assisted the City of Oakland Park with preparation of an aerial conceptual plan, typical cross sections and FDOT cost estimate for improvements within the right-of-way along NE 12th Terrace that included a proposed sidewalk, bike lanes, and two- way angled street parking. The project limits extended approximately 1,000 LF south of East Oakland Park Boulevard and approximately 2,350 LF between Floranada Road and NE 40th Place. Specific civil engineering services provided for the roadway improvements included existing and proposed conditions within the right-of-way, a conceptual design of pedestrian connectivity to surrounding pedestrian and bicycle facilities, and attendance at two meetings associated with public involvement. City of West Palm Beach Gregory Road Green Streets LID Sanitary Sewer & Stormwater - The City of West Palm Beach requested Miller Legg to provide professional engineering, landscape architecture, surveying and construction administration services for the design and bidding assistance of a stormwater management and drainage improvements project in an existing residential neighborhood. The project involved the installation of +/- 700 LF of exfiltration trench including four (4) bioretention cell modules which provided opportunities for various Low Impact Development (LID) best management practices to reduce stormwater runoff and nuisance flooding. LID implementation was facilitated by the installation of bioretention in the bumpouts on Gregory Road, and nuisance flooding decreased through driveway modifications and speed control devices. The project is located along Gregory Road and Gregory Place between S. Olive Avenue and S. Flagler Drive. Miller Legg provided construction phase services consisting of bi-monthly meetings with City and contractors, construction observation site visits, contractor change order responses, minor fieldwork changes, shop drawing and sample review, special inspections or testing, as built review and approval, contractor pay application recommendations and completion document review. Miller Legg also conducted a public outreach meeting prior to the start of construction. This project was completed under the firm's multi-year General Engineering Services contract. City of Cocoa Beach CRA Minutemen Causeway - Minutemen Causeway is the “main street” within the Cocoa Beach Central Business District, providing a front door to City Hall and direct access to the beach. Over the last 30 years, development within the Minutemen Causeway corridor included a mix of commercial, residential, and lodging properties. This development drastically increased the impervious conditions of the corridor and significantly impacted the stormwater system within the area, causing regular flooding issues. Miller Legg’s solutions for the Minutemen Causeway project was a holistic design approach to improve the stormwater / drainage issues, while invigorating the area’s economy by creating a pedestrian- oriented beachfront promenade and streetscapes. The project consisted of significant landscape beautification and geometric modifications to the corridor to promote a pedestrian-friendly environment and to stimulate economic development. In conjunction with the redevelopment, the project included low-impact stormwater facilities to meet the Total Maximum Daily Load reduction requirements, as outlined within the Indian River Lagoon Basin Management Action Plan. These stormwater improvements included pervious paver sidewalks and parallel parking, bio-swales with native vegetation, and underground stormwater infiltration facilities with nutrient absorption materials. The entire project was a City pilot program for Low Impact Design (LID) and Best Management Practices (BMP) for stormwater management. Utilizing this innovative approach, this project was able to secure significant funding from the State, including almost $5 million from the Florida Department of Environmental Protection. Page 744.2. Qualification of Key Personnel Assigned to Engagement Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA Years of Experience: 16 Years With the Firm: 1 Registrations & Certifications: Engineer In Training, FL Registered Professional Engineer, FL, 2021 Education: Bachelor of Engineering, Civil Engineering Institute of Technology, Havana, 2006 Professional Experience: Mr. Santana is a Project Engineer with an expansive background in civil and roadway engineering for both public and private sector clients. He has robust site development (water, sewer, paving, drainage) as well as highway and roundabout design and asbuilt experience. Mr. Santana has highly developed engineering software skills across a number of platforms including Autodesk Civil 3D, OpenRoads Designer, Inventor, Naviswork and Infraworks. Relevant Project Experience: City of Miami Gardens Rolling Oaks Regional Park - Renovations of Rolling Oaks Regional Park include construction of a new one-story 4,000 SF recreation building, renovated restroom facilities, expansion of walking trail with lighting, distance marker, and exercise stations, new pavilions, new parking lot, refurbished basketball and tennis courts, new fencing, new shaded playgrounds, new landscaping and irrigation, addition of horseshoe pits, sand volleyball, mini golf and splashpad, and video system and WIFI. Miller Legg is providing civil engineering, landscape architecture and surveying services for this 7-acre park as a subconsultant to Synalovski, Romanik and Saye Architects. The civil scope includes design of a lift station and on-site force main extension to service the proposed Welcome Center. An arborist assessment of existing trees and palms was carried out as part of the landscape architecture services. City of Oakland Park East Dog Park - To assist with the City of Oakland Park's plan to develop a 1-acre Dog Park at the existing Richard Giusti Heart Par Cours Park, Miller Legg was retained for topographic and tree surveying, SUE, engineering and landscape architecture services as well as an opinion of probable cost. The firm is providing schematic designs and renderings to provide off- street parking along NE 6th Avenue and NE 36th Street, sidewalk connectivity, modification to the existing jogging trail, dog park design for small and large dogs which includes landscape improvements, tree additions, canopy shelters, water stations, pet waste stations, benches and asphalt walking paths. This project is being performed under Miller Legg's continuing services contract. Miami-Dade County Water and Sewer Department (WASD) E15- WASD-02 Relocation of 8 Pump Stations - Miller Legg is conducting due diligence and feasibility studies to relocate and upgrade eight (8) pump stations (PS 0812, PS 0815, PS 0831, PS 0856, PS 0865, PS 0867, PS 0882, PS 0894) identified as having issues related to accessibility, maintenance and deterioration. The scope of work includes a complete report evaluating possible alternative sites and pump station layouts and providing more feasible alternatives to facilitate the design, permitting and construction of the new pump stations. An analysis of gravity sewer routing will be provided to ensure maximum depths for wet wells and gravity sewer lines are not exceeded. Meetings with Miami-Dade Co. Public Works, appropriate governmental agencies and Homeowner Associations to discuss site access will be scheduled as necessary. The final deliverable will be a Due Diligence and Feasibility Report to include site plan sketches, permitting requirements, and WASD comments. University of Miami (UM) Knight Recital Hall Construction Trailer - Miller Legg is providing civil engineering services for the preparation of a temporary construction compound associated with the Knight Recital Hall at the University of Miami. The scope includes preparation of site civil engineering construction documents. Hollywood Beach Golf Course and Club House - Miller Legg is on the architecture team to provide civil engineering design services for the 104- acre 18-hole Hollywood Beach Golf Ismael Santana, PE Project Engineer (As Needed) Page 754.2. Qualification of Key Personnel Assigned to Engagement Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA Course project which includes the design of a new golf course clubhouse and parking lot, golf course remodeling and accessory buildings within the parcel. The project also plans to accommodate approximately 8,800 LF of perimeter greenway / pathway. The firm is assisting with the development of the final programming and conceptual plan, including utility map, as-builts and existing site condition research as well as preparation of schematic design for tree, plant beds and hardscape locations. Civil design for the Clubhouse and Parking lot will include clearing/demolition, geometry, signage and marking, utility, paving, grading and drainage plans as well as construction details. The design will incorporate Crime Prevention Through Environmental Design (CPTED) principles. A paving, grading and drainage plan will also be provided for the proposed maintenance barn. Permitting will be coordinated with the City of Hollywood, Broward County and South Florida Water Management District. The scope includes preparation of a stormwater report for the project. Miller Legg will assist with construction phase services including civil construction administration. Fort Lauderdale Executive Airport (FXE) Mitigation Services Parcel 21B - Fort Lauderdale Executive Airport (FXE) is developing a portion of Parcel 21B, located north of Commercial Boulevard and west of NW 21st Avenue, as a parking lot for airport tenant employees, rental car companies, and long term customer parking. The parcel is approximately six acres and is designated as a Natural Resource Area by Broward County Environmental Protection and Growth Management Department (BCEPGMD). Miller Legg is providing preparation of a conservation easement and environmental mitigation services on the parcel. Broward County Convention Center Expansion Owner's Representative - Miller Legg is part of The Weitz Company Owners Representative Team acting on behalf of Broward County for the expansion of the Convention Center and new Hotel. The expansion includes the addition of an 800- room, 29-story headquarters hotel, exhibit hall space, retail establishments, urban open space development and associated parking structure(s) on a 44- acre site that lies within the City limits of Fort Lauderdale, adjacent to Port Everglades. In the Owners Representative role, Miller Legg has provided the following: development of site civil engineering and traffic elements included in the design criteria package developer solicitation, site traffic circulation study, preliminary project scheduling, preliminary development and review of developer agreements, and developer proposal submission review. Furthermore, since October 2019, the firm is performing sitewide civil construction observation services for this multi-phased project. Broward County Forensic Science Center (Medical Examiner Office and Sheriff Office Crime Laboratory) - Miller Legg provided due diligence services related to the pre- design phase of the Broward County Forensic Science Center which will house the Broward County Medical Examiner Office and Broward Sheriff's Office Crime Laboratory. This combined facility will be constructed on a 7-acre vacant parcel in Fort Lauderdale. The due diligence services included analysis of site conditions, review of client-provided information, zoning and land planning regulations analysis, civil design recommendations, as well as client coordination. Miller Legg is now providing civil engineering services from schematic design to construction documents as well as bidding assistance, land planning DRC site plan submittal, and construction administration services for this 177,000 SF $210 million project. Broward County Sheriff's Office New Training Center Garage Design/Build - Miller Legg is part of the ANF Group Design Build Team contracted to develop the Broward County Sheriff's Office (BSO) planned new Training Center Parking Garage in Fort Lauderdale. The project consists of an 80,000 SF 7-story structure, 2 stories for training and 5 stories for 700+ parking spaces. Miller Legg's scope of services includes site surveying, site civil and utility infrastructure engineering, landscape architecture and permitting assistance. Survey services include topographic and tree surveying as well as underground utilities designation and mapping. Landscape architecture services include landscape planting and irrigation design. The firm's certified arborists will collect site data to prepare tree disposition and mitigation construction documents. Permitting coordination will take place with Broward County Environmental Management Division, Fire Department, Health Department and with SFWMD. The firm will be responsible for civil, landscape and irrigation, construction observation and administration. This project is being pursued for LEED Silver Certification. Broward County South New Regional Courthouse Pre-Design Phase - Miller Legg is providing pre- design civil engineering services related to the development of the new Broward County South Regional Courthouse in Hollywood. The firm is responsible for site civil and landscape architecture programming, detailed site plan design evaluation, assistance with project development schedule including code compliance due-diligence, agency review processes and timeline, and approval requirements for site design completion, construction cost estimates, and estimated construction schedule. Site design evaluation included anticipated traffic generation and evaluation of traffic flow patterns. The traffic volume and flow patterns identified necessary infrastructure to accommodate including off-site dedicated right-turn lanes, design and implementation of a functional round- about incorporated into the proposed facility, and off-site lane assignments by means of striping to accommodate an off- site left-in. Additional site design evaluation included preliminary drainage calculations to determine size requirements for underground stormwater storage system. An alternate site and program was subsequently selected by the County and in early 2022 Miller Legg performed a program analysis for the alternate site and pre-design analysis to include the alternate site traffic and pedestrian circulation, public transportation, stormwater design, zoning and building setbacks evaluation. Page 764.2. Qualification of Key Personnel Assigned to Engagement Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA Years of Experience: 6 Years With the Firm: 0 Education: Bachelor of Science, Civil Engineering Universidad Tecnologia de La Habana (CUJAE, Havana, 2015 Professional Experience: Mr. Vazquez is a Project Engineer with a background in civil and transportation design. He has worked on public and private sector projects involving a variety of elements such as site development, road, intersection and interchange design, utility design, feasibility studies, environmental impact assessments and erosion control. He is skilled in AutoCAD products, Revit and Sketchup. Relevant Project Experience: Town of Davie New Town Hall Engineering Design Criteria Package (DCP) - Miller Legg is contracted with the Town of Davie for surveying and the engineering Design Criteria Package for the proposed new Town Hall site. Boundary and Topographic Surveying has been completed using laser scanner technology and conventional surveying methods. The dense tree canopy on the southern portion of the site proved a challenge for the scanner crew. The use of the scanning technology improved the anticipated schedule for the deliverable. Miller Legg is coordinating with Town staff to prepare the master roadways, access points, and utilities for the Town Hall site which will include the other construction sites adjacent to the Town Hall site. Miller Legg is working to coordinate the relocation of utilities for the Town Hall site and the upgrade to the Town Hall lift station, which serves the Town Hall site and adjacent proposed and existing developments. The scope also includes a civil and landscape architecture site feasibility study, bidding and permitting assistance and construction administration. City of Oakland Park East Dog Park - To assist with the City of Oakland Park's plan to develop a 1-acre Dog Park at the existing Richard Giusti Heart Par Cours Park, Miller Legg was retained for topographic and tree surveying, SUE, engineering and landscape architecture services as well as an opinion of probable cost. The firm is providing schematic designs and renderings to provide off- street parking along NE 6th Avenue and NE 36th Street, sidewalk connectivity, modification to the existing jogging trail, dog park design for small and large dogs which includes landscape improvements, tree additions, canopy shelters, water stations, pet waste stations, benches and asphalt walking paths. This project is being performed under Miller Legg's continuing services contract. Miami Dade College (MDC) North Campus Roadway Assessment - Miller Legg is providing engineering, surveying and landscape architecture consulting services to help assess the existing roadway conditions and provide engineering plans to help address stormwater ponding at the Miami Dade College North Campus. Engineering services include roadway and drainage field condition assessment and report, including recommendations for pavement, curbing, drainage flow, traffic circulation and landscaping issues. In addition, Miller Legg will provide surveying and construction administration services. School Board Broward County (SBBC) Stirling Elementary Traffic Circulation - Miller Legg is reviewing proposed circulation options developed by SBBC staff in order to provide a site circulation study and conceptual plans for the improvements of site traffic circulation and to attempt to eliminate traffic congestion for Stirling Elementary School in Hollywood, FL. The study will include stacking, staging and circulation elements and conceptual planning will meet all ADA requirements related to the site. Pembroke Falls Tree Inventory - Miller Legg performed arborist services and street tress inventory for the Pembroke Falls community, which consists of 18 subdivisions. Upon completion of these services, the community retained Miller Legg to perform additional services including drainage permitting, sidewalk repair plans and surveying. Mowry Estates Subdivision (Individual Experience) - Provided engineering design of water, sewer, paving, grading, pavement marketing and signal, drainage for a subdivision developed by D.R. Horton in Homestead, FL. Kendall Assemblage Subdivision (Individual Experience) - Provided engineering design of water, sewer, paving, grading, pavement marketing and signal, drainage for a residential subdivision developed by Lennar Homes in Miami-Dade County, FL. Jinama Farms Subdivision (Individual Experience) - Provided engineering design of water, sewer, paving, grading, pavement marketing and signal, drainage for a subdivision developed by D.R. Horton in Miami- Dade County. Carlos Vazquez Project Engineer (As Needed) Page 774.2. Qualification of Key Personnel Assigned to Engagement Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA Years of Experience: 43 Years With the Firm: 37 Registrations & Certifications: Registered Professional Surveyor & Mapper, FL, 1998 Continuing Education: Land Boundaries, 2018 Wetlands Delineation, 2018 Professional & Civic Activities: Past Vice President, Florida Surveying & Mapping Society, Broward Chapter Professional Experience: Mr. Rossi is a Senior Project Surveyor with more than four decades of surveying and subsurface utility engineering (SUE) experience. His principal areas of experience include surveys such as boundary, topographic, ALTA/ACSM land title surveys, quantity, environmental and wetland, condominium, construction layout, as- built, right-of-way, specific purpose and subdivisions and platting, as well as subsurface utility engineering (SUE). He currently manages the South Florida survey department and field crews and is an Associate with the firm. Relevant Project Experience: City of Sunny Isles Beach Gwen Margolis Park and Pelican Community Park Artificial Turf - The project consisted of the reconstruction of existing natural turf fields at Pelican Community Park and Senator Gwen Margolis Park in the City of Sunny Isles Beach with artificial turf. Miller Legg provided the preparation and permitting of drainage plans to collect under the new drain systems installed as part of the project, as well as surveying services. In addition, construction observation was provided to verify compliance with the plans and for the certification of the project through regulatory agencies. City of Sunny Isles Beach Pelican Community Park - A three-acre active park site, for which Miller Legg managed landscape architecture, irrigation, engineering, surveying and architecture designs for a baseball field, recreation building, playground structure, gymnasium, and related site amenities within the City of Sunny Isles Beach. The project management team at Miller Legg received recognition from the City for their involvement in the design completion of the park. In addition, Miller Legg provided construction observation services. In addition, we also provided grant assistance to secure a Florida Recreational Development Assistant Program (FRDAP) grant for $200,000. FRDAP is a competitive grant program that provides financial assistance to local governments for development or acquisition of land for public outdoor recreational purposes. Award: Award of Merit, American Society of Landscape Architects, Florida Chapter, 2009 Sunny Isles Marina Survey - For this 3-acre marina site in the City of Sunny Isles Beach, Miller Legg prepared and updated an American Land Title Association (ALTA) survey as well as a topographic survey of the docks. City of Homestead Biscayne- Everglades Greenway Trail - Among the services Miller Legg provided for this 3.2 mile, 12-foot-wide Biscayne Everglades Greenway shared-use trail project are landscape architectural, engineering, surveying and environmental services including preparation of FDOT- approved construction documents, design of regulatory and wayfinding signs, pavement markings, safe pedestrian push button crossing and necessary drainage within the C-103 Canal right-of-way from East Mowry Drive to SW 137th Avenue in Homestead. The scope of services was based upon a 2017 Florida Shared-use Non-Motorized Trail Agreement between the City of Homestead and FDOT. Topographic and SUE services were delivered. The scope included engineering design and permitting services for the shared-use trail, associated drainage and roadway pedestrian crossings. The firm also carried out Preliminary Natural Resource and Protected Species Investigations and documents related to designation of the Project by FDOT as a Documented Categorical Exclusion. City of Miami Armbrister Park Community Center - Esther Mae Armbrister Park is a 4.4-acre City of Miami Park located at 4000 Grand Avenue, Miami, FL 33133 in the Coconut Martin Rossi, PSM Project Surveyor | SUE Services | 3D Laser Scanner (5% Availability) Page 784.2. Qualification of Key Personnel Assigned to Engagement Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA Grove neighborhood. Park amenities include an existing community center, baseball and football fields, tennis and basketball courts, playground and exercise equipment. The project involves replacement of the existing community center building with a new 10,000 SF 2- story facility and outdoor pavilion. Miller Legg is responsible for civil, landscape architecture and SUE services along with boundary, topographic and tree surveying. The firm is providing site civil and utility infrastructure research of utility maps, as-builts and existing site conditions followed by preparation of civil, landscape architecture and irrigation construction documents, government agency permitting coordination, bidding assistance, contract administration and construction administration. Tree inventory, disposition plans and permitting are part of the scope provided by the firm's certified arborists. City of Miami Beach Chase Avenue and 34th Street Shared Path - Under its continuing services agreement with the City of Miami Beach, Miller Legg was retained to provide surveying, civil engineering and landscape architecture services related to the new Chase Avenue and 34th Street shared path and roadway improvements project. The 10- ft shared use path will support the use of simultaneous pedestrian and bicycle activity. The scope of services includes topographic surveying, tree inventory, disposition and permitting; irrigation, landscape, hardscape and amenities design, site civil design development for clearing/demolition, signage and marking, paving, grading, drainage and erosion control/pollution prevention. Team subconsultants are performing geotechnical tasks (soil test borings and SFWMD exfiltration tests) and electrical engineering/site lighting. Miller Legg is also responsible for permitting coordination with the City and Miami- Dade DERM, as well as bidding assistance/contract administration and construction phase tasks including construction observation. City of Miami Fairlawn Community Park - Under our continuing services contract with the City of Miami, Miller Legg was awarded the development of programming, pre-design/concept, design, construction document preparation and construction phase services for a new park on SW 63rd Avenue. The scope includes civil engineering, landscape architecture, certified arborist, surveying and SUE, structural, electrical and geotechnical engineering as well as permitting, opinion of probable cost and limited construction administration. The passive park will contain a shaded/fenced children's playground, dog run, shared pedestrian / bicyclist perimeter path, light bollards, benches, pedestrian pole lighting, irrigation, water fountain, bike racks, receptacles, hardscape furniture, access driveway and perimeter privacy walls. Permitting will be coordinated with the City of Miami, Miami-Dade County DERM, WASD and SFWMD. Survey services include boundary and topographic and tree inventory. Miller Legg will assist the City with the presentation of conceptual designs at Community Meetings to gather public input for a final design. City of Miami Museum Park Baywalk Phase 3 - Miller Legg provided landscape architecture, civil engineering, lighting/electrical engineering, surveying, permitting and limited construction administration services for the Miami Baywalk Phase 3 Project. Permitting for project improvements was provided through the City of Miami, Miami-Dade County and South Florida Water Management District. Underground utility designation for electric and drainage utilities was performed.The project is a 1/4 mile pedestrian-oriented urban waterfront park and promenade on Biscayne Bay, located adjacent to the east coast greenway. It provides a unique open space that links the American Airlines Arena, Biscayne Boulevard, and Museum Park. The Baywalk design includes custom native stone benches, extensive paver pedestrian spaces, salt-tolerant tropical plantings, as well as themed lighting and site amenities. Due to historic maritime activities in the project area, soil conditions were addressed through the design of unique drainage facilities that minimized potential groundwater impacts. The Baywalk design solution also improved visibility and lighting in the area to discourage vagrancy issues that existed. The planting design not only enhanced aesthetics, but also buffered unsightly adjacent parking and utility areas and minimized exposed surfaces that had been subject to graffiti. This project was performed under our Miscellaneous Landscape Architectural Services contract. City of Miami Beach 19th Street Stormwater Pump Station & Botanical Gardens - Miller Legg was part of the Ric-Man Construction and WSP team selected by the City of Miami Beach for its Design-Build 19th Street Stormwater Pump Station project, part of the citywide Stormwater improvement system. Construction of this pump station is part of the overall plan for the City-wide stormwater improvement system to reduce flooding for residents of the Washington Avenue and Convention Center Drive neighborhood. The existing system consists of a collection network with no storage or treatment capability which discharged into the Collins Canal. The project scope includes a stormwater treatment system, energy dissipating structure, seawall modifications and connection of the trunk line to the proposed pump station. Miller Legg's survey services included topographic surveying services to establish the perimeter, show aboveground improvements, trees, accessible storm and sanitary structures, right of way and easements. A survey of utility designation markings was also provided. In addition, the firm prepared an as-built survey of constructed improvements on the 19th Street pump station, the associated parking area and the re-capping areas of the seawall to show above ground utility, storm system catch basins and manholes with invert elevations, signage, and parking stripping. Also, Miller Legg provided tree inventory and analysis, hardscape, landscape and irrigation design. Page 794.2. Qualification of Key Personnel Assigned to Engagement Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA Years of Experience: 27 Years With the Firm: 19 Registrations & Certifications: Certified Survey Technician Level I, FL, 2008 Education: Bachelor of Science, Electrical Engineering Kiev Polytechnical University, Kiev, UK , 1987 Professional Experience: Ms. Podolskaya is a Senior Survey Technician who specializes in right-of- way surveying, boundary surveying and construction layout. She has worked on boundary, topographic, right-of-way, engineering design, construction layout, and control surveys overseeing and assisting with numerous projects for the Florida Department of Transportation, utilizing MicroStation. She also is experienced in AutoCAD working with numerous government and private sector clients including municipalities and counties, as well as for educational facilities and health care clients, and private developers. Relevant Project Experience: City of Sunny Isles Beach Gwen Margolis Park and Pelican Community Park Artificial Turf - The project consisted of the reconstruction of existing natural turf fields at Pelican Community Park and Senator Gwen Margolis Park in the City of Sunny Isles Beach with artificial turf. Miller Legg provided the preparation and permitting of drainage plans to collect under the new drain systems installed as part of the project, as well as surveying services. In addition, construction observation was provided to verify compliance with the plans and for the certification of the project through regulatory agencies. City of Miami Moore Park NW 36th Street Driveway Revisions - As part of the design for Moore Park, revisions and permitting were done for the access into the park, and the parking lot along NW 36th Street. In addition, Miller Legg provided topographic and misc. surveys. City of Miami Gardens Rolling Oaks Regional Park - Renovations of Rolling Oaks Regional Park include construction of a new one-story 4,000 SF recreation building, renovated restroom facilities, expansion of walking trail with lighting, distance marker, and exercise stations, new pavilions, new parking lot, refurbished basketball and tennis courts, new fencing, new shaded playgrounds, new landscaping and irrigation, addition of horseshoe pits, sand volleyball, mini golf and splashpad, and video system and WIFI. Miller Legg is providing civil engineering, landscape architecture and surveying services for this 7-acre park as a subconsultant to Synalovski, Romanik and Saye Architects. The civil scope includes design of a lift station and on- site force main extension to service the proposed Welcome Center. An arborist assessment of existing trees and palms was carried out as part of the landscape architecture services. City of Coral Springs Municipal Complex - Miller Legg provided assistance with the master planning phase of the new Coral Springs Municipal Complex development, which is part of a larger effort to redevelop the downtown section of Coral Springs. Services provided for this 5-story 74,000 SF City Hall building/4-story 607-space parking garage include: site civil engineering, survey, traffic (vehicular/pedestrian) and utilities infrastructure requirements, site permitting, overall project scope development and significant construction observation services. Site civil engineering support-related services concerned the surface water management system, canal reconfiguration, vehicular/pedestrian access/connectivity, signing, pavement marketing, parking improvements and cost estimates. Survey services comprised as-built design, cross-sections and various site design surveys. In addition, community-oriented programming and planning process including meeting attendance was provided. Miller Legg was a subconsultant to Song & Associates Architects. The project was a Florida AIA 2019 People's Choice Award nominee. Larisa Podolskaya, CST I Senior CAD Technician (As Needed) Page 804.2. Qualification of Key Personnel Assigned to Engagement Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA City of West Palm Beach Congress Avenue Water Main Relocation - Miller Legg provided civil engineering and construction administration services for the City of West Palm Beach for the design and general contractor assistance of a water main relocation project on Congress Avenue at the City’s “F” Canal. Relocation of the existing 10” water main was required to accommodate a Palm Beach County (County) Roadway Improvement project, which includes replacement of the existing Congress Avenue “F” Canal Bridge with a double 66” RCP culvert system. Of the 300 LF of 12" water main, 26 LF is sleeved under a Lake Worth Drainage District canal. The existing 10” water main is attached to underside of the existing bridge that will be demolished. In addition, Miller Legg designed a liner to navigate under the City's Canal F to allow for future maintenance requirements, pipe protection during future dredging/maintenance and ease of installation. The project is located on Congress Avenue between Okeechobee Boulevard and Ware Drive. Construction phase services included 3 times weekly site inspections, construction document clarification, change order response, shop drawing and sample review and approval, special inspections or testing, contractor pay application review, completion document review. This project was completed under the firm's multi-year General Engineering Services contract. City of Homestead Biscayne- Everglades Greenway Trail - Among the services Miller Legg provided for this 3.2 mile, 12-foot-wide Biscayne Everglades Greenway shared-use trail project are landscape architectural, engineering, surveying and environmental services including preparation of FDOT- approved construction documents, design of regulatory and wayfinding signs, pavement markings, safe pedestrian push button crossing and necessary drainage within the C-103 Canal right-of-way from East Mowry Drive to SW 137th Avenue in Homestead. The scope of services was based upon a 2017 Florida Shared-use Non-Motorized Trail Agreement between the City of Homestead and FDOT. Topographic and SUE services were delivered. The scope included engineering design and permitting services for the shared-use trail, associated drainage and roadway pedestrian crossings. The firm also carried out Preliminary Natural Resource and Protected Species Investigations and documents related to designation of the Project by FDOT as a Documented Categorical Exclusion. City of Fort Pierce Coastal Construction Control Line Permitting - Through our continuing services contract with the City, Miller Legg provided Coastal Construction Control Line Permitting services for Jetty Park, Kimberly Bergalis Park and South Beach Boardwalk Park. Services included existing site condition analysis, on-site jurisdictional determination, and preparation and submittal of applications and sketches indicating project plan with mitigation, and support data to the Florida Department of Environmental Protection. Miller Legg also prepared a mitigation plan for Kimberly Bergalis and South Beach Boardwalk Parks, which included designing a plan to offset dune impacts associated with the proposed improvements. City of Miami Museum Park Baywalk Phase 3 - Miller Legg provided landscape architecture, civil engineering, lighting/electrical engineering, surveying, permitting and limited construction administration services for the Miami Baywalk Phase 3 Project. Permitting for project improvements was provided through the City of Miami, Miami-Dade County and South Florida Water Management District. Underground utility designation for electric and drainage utilities was performed.The project is a 1/4 mile pedestrian-oriented urban waterfront park and promenade on Biscayne Bay, located adjacent to the east coast greenway. It provides a unique open space that links the American Airlines Arena, Biscayne Boulevard, and Museum Park. The Baywalk design includes custom native stone benches, extensive paver pedestrian spaces, salt-tolerant tropical plantings, as well as themed lighting and site amenities. Due to historic maritime activities in the project area, soil conditions were addressed through the design of unique drainage facilities that minimized potential groundwater impacts. The Baywalk design solution also improved visibility and lighting in the area to discourage vagrancy issues that existed. The planting design not only enhanced aesthetics, but also buffered unsightly adjacent parking and utility areas and minimized exposed surfaces that had been subject to graffiti. This project was performed under our Miscellaneous Landscape Architectural Services contract. City of Homestead Campbell Drive/SW 312th Street & SW 144 Avenue Crossing C-103-N Canal End - Miller Legg provided a specific purpose topographic survey and civil engineering design services to the City for emergency repairs of a guardrail located on the east side of the north parapet of FDOT Bridge No. 874353. The bridge is located on Campbell Drive/SW 312th Street and crosses the C-103-N Canal. This project was designed through the City's Library of Consultants for Architectural and Engineering services. City of Miami Beach Chase Avenue and 34th Street Shared Path - Under its continuing services agreement with the City of Miami Beach, Miller Legg was retained to provide surveying, civil engineering and landscape architecture services related to the new Chase Avenue and 34th Street shared path and roadway improvements project. The 10- ft shared use path will support the use of simultaneous pedestrian and bicycle activity. The scope of services includes topographic surveying, tree inventory, disposition and permitting; irrigation, landscape, hardscape and amenities design, site civil design development for clearing/demolition, signage and marking, paving, grading, drainage and erosion control/pollution prevention. Team subconsultants are performing geotechnical tasks (soil test borings and SFWMD exfiltration tests) and electrical engineering/site lighting. Miller Legg is also responsible for permitting coordination with the City and Miami- Dade DERM, as well as bidding assistance/contract administration and construction phase tasks including construction observation. Page 814.2. Qualification of Key Personnel Assigned to Engagement Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA Years of Experience: 25 Years With the Firm: 3 Registrations & Certifications: Remote Pilot Certification, FL, 2020 Certified Survey Technician Level I, FL, 2021 Education: Associate of Science, Drafting/CAD ATI Career Training Center, 2002 Civil Engineering (2 of 5 yrs completed for Bachelor's) National Autonomous University of Honduras, 1997 Continuing Education: AutoDesk Training Leica Cyclone & Cloudworx for AutoCAD Professional Experience: Sandro has more than 22 years of professional surveying experience ranging from a field crew chief to survey manager overseeing survey crews. His areas of expertise include land surveying, boundary, topographic, ALTA, control surveys, utility surveys, 3D Radar Tomography, GPS, route surveys, legal descriptions, laser scanning, and construction layout calculations. He is experienced in AutoCAD, Civil 3D, Cyclone and CloudWorx, and Trimble Geomatics Office. Prior to joining Miller Legg, Sandro was Survey Coordinator Manager with another South Florida surveying firm for 15 years. Relevant Project Experience: City of Miami Fairlawn Community Park - Under our continuing services contract with the City of Miami, Miller Legg was awarded the development of programming, pre-design/concept, design, construction document preparation and construction phase services for a new park on SW 63rd Avenue. The scope includes civil engineering, landscape architecture, certified arborist, surveying and SUE, structural, electrical and geotechnical engineering as well as permitting, opinion of probable cost and limited construction administration. The passive park will contain a shaded/fenced children's playground, dog run, shared pedestrian / bicyclist perimeter path, light bollards, benches, pedestrian pole lighting, irrigation, water fountain, bike racks, receptacles, hardscape furniture, access driveway and perimeter privacy walls. Permitting will be coordinated with the City of Miami, Miami-Dade County DERM, WASD and SFWMD. Survey services include boundary and topographic and tree inventory. Miller Legg will assist the City with the presentation of conceptual designs at Community Meetings to gather public input for a final design. City of Miami Armbrister Park Community Center - Esther Mae Armbrister Park is a 4.4-acre City of Miami Park located at 4000 Grand Avenue, Miami, FL 33133 in the Coconut Grove neighborhood. Park amenities include an existing community center, baseball and football fields, tennis and basketball courts, playground and exercise equipment. The project involves replacement of the existing community center building with a new 10,000 SF 2- story facility and outdoor pavilion. Miller Legg is responsible for civil, landscape architecture and SUE services along with boundary, topographic and tree surveying. The firm is providing site civil and utility infrastructure research of utility maps, as-builts and existing site conditions followed by preparation of civil, landscape architecture and irrigation construction documents, government agency permitting coordination, bidding assistance, contract administration and construction administration. Tree inventory, disposition plans and permitting are part of the scope provided by the firm's certified arborists. City of Miami E.G. Sewell Park - Miller Legg is under contract with the City of Miami for program development, pre-design, master planning design including public involvement workshops, construction documents and construction administration services for Sewell Park. The program will be an open passive park with elements including passive walkways through park and preserve areas, pavilions, an eco trail, baywalk, hardscape, floating docks, kayak launch, seawall/living shoreline, wayfinding and historical information signage. The scope of services includes landscape architecture, irrigation, civil engineering, topographical surveying, SUE, certified arborist, structural engineering, electrical engineering, geotechnical engineering, archeological, Sandro Elvir, CST I Senior CAD Technician (As Needed) Page 824.2. Qualification of Key Personnel Assigned to Engagement Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA permitting, bidding assistance and limited construction administration. Miller Legg will also conduct a Bonneted Bat survey and perform a bathymetric survey for the seawall component. The firm is assisting the City to gather community stakeholder input during the design process. Government agency permitting will be coordinated with Miami-Dade Co. DERM, WASD and SFWMD. City of Miami Beach Chase Avenue and 34th Street Shared Path - Under its continuing services agreement with the City of Miami Beach, Miller Legg was retained to provide surveying, civil engineering and landscape architecture services related to the new Chase Avenue and 34th Street shared path and roadway improvements project. The 10- ft shared use path will support the use of simultaneous pedestrian and bicycle activity. The scope of services includes topographic surveying, tree inventory, disposition and permitting; irrigation, landscape, hardscape and amenities design, site civil design development for clearing/demolition, signage and marking, paving, grading, drainage and erosion control/pollution prevention. Team subconsultants are performing geotechnical tasks (soil test borings and SFWMD exfiltration tests) and electrical engineering/site lighting. Miller Legg is also responsible for permitting coordination with the City and Miami- Dade DERM, as well as bidding assistance/contract administration and construction phase tasks including construction observation. City of Tamarac University Drive Landscaping Improvements - Miller Legg is providing landscape architecture, hardscape, and irrigation design, permitting, specific purpose survey of the existing medians, utility coordination, utility designation, and construction administrative services for improvements to the existing system of medians on University Drive between NW 78th Street and Southgate Blvd. in the City of Tamarac. Certified Arborist services may also be included for tree analysis, removal and relocation needs. Coordination with numerous agencies including FDOT, SFWMD and the City of Tamarac will also be performed. The project has received funding from an FDOT Grant and included creation of MMOA (Maintenance agreements) between the City and FDOT. Miller Legg worked consistently with both the City of Tamarac and FDOT to meet the strict deadlines to receive this additional funding. City of Coral Gables Sunrise Harbor Surveying - As part of the team which conducted a drainage infrastructure needs assessment within the Sunrise Harbor neighborhood in Coral Gables, Miller Legg was retained to perform topographic surveying of roadways within the subdivision to show above-ground improvements including evidence of utilities, sanitary and drainage sewer structure rim elevations and traffic signs. Invert elevations, pipe sizes, directions and material were shown in accessible storm and sanitary sewer structures. A tree survey was conducted to show trees in the right-of- way as well as trunk diameters, approximate heights and canopy spreads. The scope also included topographic surveys on specific lots and provided bottom of canal elevations at outfalls and outfall pipe invert elevations. Our crews used our terrestrial field 3-D scanner to complete this work in an expeditious manner. City of Miami Beach 20th Street & Sunset Drive Pocket Park - Under our Continuing Services Contract with the City of Miami Beach, Miller Legg was awarded an assignment to provide survey, civil, geotechnical, electrical, structural engineering and landscape architecture services for the design, permitting and construction of a new ADA-accessible .33-acre pocket park at 20th Street and Sunset Drive. The firm prepared a boundary and topographic survey, assisted with the planning of key program elements and performed schematic design, design development, construction document, bidding and construction tasks. The design incorporates Crime Prevention Through Environmental Design (CPTED) principles. Arborist and irrigation design services were also furnished for this project. City of Homestead Biscayne- Everglades Greenway Trail - Among the services Miller Legg provided for this 3.2 mile, 12-foot-wide Biscayne Everglades Greenway shared-use trail project are landscape architectural, engineering, surveying and environmental services including preparation of FDOT- approved construction documents, design of regulatory and wayfinding signs, pavement markings, safe pedestrian push button crossing and necessary drainage within the C-103 Canal right-of-way from East Mowry Drive to SW 137th Avenue in Homestead. The scope of services was based upon a 2017 Florida Shared-use Non-Motorized Trail Agreement between the City of Homestead and FDOT. Topographic and SUE services were delivered. The scope included engineering design and permitting services for the shared-use trail, associated drainage and roadway pedestrian crossings. The firm also carried out Preliminary Natural Resource and Protected Species Investigations and documents related to designation of the Project by FDOT as a Documented Categorical Exclusion. City of Miami Gardens Rolling Oaks Regional Park - Renovations of Rolling Oaks Regional Park include construction of a new one-story 4,000 SF recreation building, renovated restroom facilities, expansion of walking trail with lighting, distance marker, and exercise stations, new pavilions, new parking lot, refurbished basketball and tennis courts, new fencing, new shaded playgrounds, new landscaping and irrigation, addition of horseshoe pits, sand volleyball, mini golf and splashpad, and video system and WIFI. Miller Legg is providing civil engineering, landscape architecture and surveying services for this 7-acre park as a subconsultant to Synalovski, Romanik and Saye Architects. The civil scope includes design of a lift station and on- site force main extension to service the proposed Welcome Center. An arborist assessment of existing trees and palms was carried out as part of the landscape architecture services. Page 834.2. Qualification of Key Personnel Assigned to Engagement Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA Years of Experience: 18 Years With the Firm: 15 Registrations & Certifications: FDOT Intermediate Maintenance of Traffic, FL, 2021 Underground Utility Locate Certification, FL, 2022 Certified Survey Technician Level I, FL, 2021 Education: High School GED Killian Senior High School, 2001 Professional Experience: Since joining Miller Legg, Mr. Edelman worked his way up from Rod Person to Party Chief. He has experience working with both surveying and subsurface utility engineering (SUE) projects for public entities throughout South Florida. Experience includes boundary, topographic, right-of-way, as-built, special purpose surveys, cross sections, drainage surveys, construction surveys, and a variety of other surveys. Relevant Project Experience: City of Sunny Isles Beach Gwen Margolis Park and Pelican Community Park Artificial Turf - The project consisted of the reconstruction of existing natural turf fields at Pelican Community Park and Senator Gwen Margolis Park in the City of Sunny Isles Beach with artificial turf. Miller Legg provided the preparation and permitting of drainage plans to collect under the new drain systems installed as part of the project, as well as surveying services. In addition, construction observation was provided to verify compliance with the plans and for the certification of the project through regulatory agencies. City of Coral Springs Municipal Complex Topographical Survey - In preparation for the development of the new City of Coral Springs Municipal Complex, Miller Legg was retained to prepare a topographic survey to incorporate previously surveyed portions of the property to show 50' elevations as well as storm and sanitary sewer inverts. City of Miami Gardens Rolling Oaks Regional Park - Renovations of Rolling Oaks Regional Park include construction of a new one-story 4,000 SF recreation building, renovated restroom facilities, expansion of walking trail with lighting, distance marker, and exercise stations, new pavilions, new parking lot, refurbished basketball and tennis courts, new fencing, new shaded playgrounds, new landscaping and irrigation, addition of horseshoe pits, sand volleyball, mini golf and splashpad, and video system and WIFI. Miller Legg is providing civil engineering, landscape architecture and surveying services for this 7-acre park as a subconsultant to Synalovski, Romanik and Saye Architects. The civil scope includes design of a lift station and on- site force main extension to service the proposed Welcome Center. An arborist assessment of existing trees and palms was carried out as part of the landscape architecture services. City of Coral Gables Sunrise Harbor Surveying - As part of the team which conducted a drainage infrastructure needs assessment within the Sunrise Harbor neighborhood in Coral Gables, Miller Legg was retained to perform topographic surveying of roadways within the subdivision to show above-ground improvements including evidence of utilities, sanitary and drainage sewer structure rim elevations and traffic signs. Invert elevations, pipe sizes, directions and material were shown in accessible storm and sanitary sewer structures. A tree survey was conducted to show trees in the right-of- way as well as trunk diameters, approximate heights and canopy spreads. The scope also included topographic surveys on specific lots and provided bottom of canal elevations at outfalls and outfall pipe invert elevations. Our crews used our terrestrial field 3-D scanner to complete this work in an expeditious manner. City of Coconut Creek Copans Road Median Landscape Architecture Plans - For this median improvement project along Copans Road between Lyons Road and the Florida Turnpike Overpass, Miller Legg provided landscape, hardscape and irrigation design plans, tree inventory, surveying, permitting, pre-construction and construction observation services to the Gerald Edelman, CST I Survey Party Chief (As Needed) Page 844.2. Qualification of Key Personnel Assigned to Engagement Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA City. Tree, streets and highway permitting was coordinated with Broward County. City of Miami Beach 20th Street & Sunset Drive Pocket Park - Under our Continuing Services Contract with the City of Miami Beach, Miller Legg was awarded an assignment to provide survey, civil, geotechnical, electrical, structural engineering and landscape architecture services for the design, permitting and construction of a new ADA-accessible .33-acre pocket park at 20th Street and Sunset Drive. The firm prepared a boundary and topographic survey, assisted with the planning of key program elements and performed schematic design, design development, construction document, bidding and construction tasks. The design incorporates Crime Prevention Through Environmental Design (CPTED) principles. Arborist and irrigation design services were also furnished for this project. City of Miami Beach Collins Park Parking Garage - Miller Legg was a subconsultant to the Zaha Hadid Architects/Berenblum Busch Architects Team providing property boundary and topographic surveying of the proposed Collins Park Parking Garage, as well as topographic surveys of Liberty Avenue from 21st to 23rd Streets. Collins Park is at the southern end of South Beach, adjacent to the Bass Museum, Miami City Ballet and Miami-Dade Regional Public Library, a neighborhood considered the cultural destination of Miami Beach. City of Miramar Forzano Park Improvements Phase I - The City of Miramar improved an existing 13-acre active park to convert sport usage and improve operating conditions. The existing baseball clay infields, outfield and football field grass were removed and modified to provide additional football/soccer field space. Park amenities included volleyball courts and a community center. As a subconsultant to R.J. Behar, Miller Legg provided planning, landscape architecture, irrigation design and topographic survey. City of Pembroke Pines Josias Dog Park Surveying - Miller Legg prepared a topographic survey of Josias Dog Park located at Stirling Road and SW 193rd Way in Pembroke Pines. The approximately 3-acre site is experiencing drainage issues and the City required a very detailed topographic survey to be performed to enable re-design. Miami Beach South Beach Boardwalk Dune & Tree Survey and GIS Mapping - Miller Legg updated its previous +/- 1100 LF topographic and Coastal Construction Control Line (CCCL) survey for a FDEP Coastal Construction permit. This was part of the beach boardwalk improvements design project between Lummus Park and South Point Drive in South Beach. The topography included trees and all above ground improvements. Beach transects were established to the Mean Water Line and CCCL and Erosion Control Lines were also established. The dune vegetation survey included herbaceous, shrub and tree species. Vegetation data was collected using a sub-meter Trimble GPS unit. Maps were then created in a GIS program indicating dominant species coverage with related percentages. In addition a tree inventory for coastal tree species and associated attributes was conducted by our Certified Arborists and displayed on digital maps. St. Lucie County Paradise Park - Miller Legg provided survey, SUE, engineering, environmental, and permitting services for design of stormwater and roadway improvements for the Phase 5, System 4, area of the Paradise Park neighborhood in St. Lucie County. The project limits included approximately 55 acres of existing, residential neighborhood which require water quality treatment of stormwater runoff, storm attenuation and paving of existing rock roadways. United States Department of Veterans Affairs South Florida National Cemetery Phase 2 Design- Build - Miller Legg is providing civil, survey, landscape architecture, irrigation design and environmental services for Phase 2 of this Design Build project located in Lake Worth. Survey services consist of boundary and topographic surveys and surveyor title review. Environmental tasks include wetland mitigation assistance and threatened and endangered species coordination in addition to annual mitigation monitoring over 5 years and gopher tortoise survey, permitting and relocation. The firm is providing landscape and irrigation design development, construction and record drawing documents. Civil construction document preparation including signing and pavement marking, pre-construction and construction period services are also being provided. Miller Legg was the prime consultant for the master planning, design, and construction for the development of the 313-acre national cemetery in Palm Beach County. Miami-Dade County Parks, Recreation & Open Spaces (PROS) Kendall Soccer Park Turf Replacement Survey - Miller Legg was selected to provide topographic survey services to Miami-Dade County for the purposes of showing above-ground improvements and tree locations for an artificial turf replacement project on five (5) soccer fields. The survey was designed to show rim and invert elevations, pipe and drainage structure sizes. Miami-Dade County Water and Sewer Department (WASD) Pump Station Improvement Program (PSIP) No. 0331 Survey - Miller Legg has performed surveying tasks for a number of pump stations in Miami, consisting of property boundary and legal descriptions, topographic survey and pump station data collection. This work is being carried out under our Miami- Dade Water and Sewer Department (WASD) Pump Station Improvement Program (PSIP) contract as part of the CES Consultants design team, meeting both County and municipal survey requirements. The PSIP is part of the ongoing upgrade of the County wastewater collection and transmission system to bring all pump stations into compliance with the specified average pump operating time requirement. In addition to surveying services, the firm provides field utility coordination as well as field validation of the proposed improvements layout. Page 85Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 4.3 Project Approach Miller Legg has completed numerous municipal, county, state and federal projects ranging from neighborhood improvement and redevelopment projects, educational facilities site planning, cemeteries, neighborhood parks, and golf course designs to aviation facilities, regional water and sewer utilities, streetscapes, and streets and highways. Our approach to each project is best characterized by a “partnering relationship.” We dedicate ourselves to learning the culture of our clients, their specific concerns, desires and needs, much like an extension of their own offices. We consistently strive to maintain time schedules and to provide factual and frequent communication. Our Approach and Methods for handling projects are outlined in further detail in the following sections: Our City of Sunny Isles Beach Team is headed by licensed landscape architecture professionals. These professionals have been specifically selected for this Continuing Services Contract based upon their areas of specialization and their experience with municipal and public projects. Our Team’s Project Manager, Brian Shore, RLA, will be the primary point of contact for City staff involved in the projects generated under this consulting services contract. Brian has 22 years of professional landscape architecture experience in the design, permitting, and construction of land development projects in South Florida. He has been managing multi-disciplinary projects and has successfully completed numerous projects for public and municipal clients. Brian is assisted by Miguel Juncal, RLA, CA who will lead this service effort as Assistant Project Manager and the lead Landscape Architect for this Contract. Miguel has over 18 years PROJECT MANAGEMENT THE MILLER LEGG APPROACH of Miami-Dade County municipal project experience. They are supported by Michael Kroll, RLA, FASLA, as Principal-in-Charge as well as Miller Legg’s full Landscape Architecture department. Details of the individual skills and accomplishments of the key professionals on our Team for this contract are outlined in their Resumes and Firm Qualifications. Miller Legg’s corporate tagline, “Improving Communities. Creating Environments.”, clearly describes our design philosophy, which is utilized in our extensive portfolio of municipal streetscape, park, and open space facility projects. With 57 years of experience, Miller Legg has led significant public involvement efforts, carried out required regulatory agency permitting, coordinated bidding activities and conducted construction administration efforts. Our design philosophy ensures the City’s vision, in correlation with the desires of the stakeholders, the existing natural and built environments, as well as a project’s sustainability and maintenance requirements. DESIGN PROCESS When addressing any landscape architecture project, Miller Legg evaluates the project using a select method of steps to achieve the highest quality deliverables for our clients. The Firm’s typical project design process is outlined as: 1. Evaluation of Existing Conditions 2. Collaboration with Stakeholders 3. Design Stage 4. Preparation of Construction Documents 5. Implementation and Construction Evaluation of Existing Conditions: This step establishes the project’s pre-existing constraints and improvement opportunities. Prior to design, we review existing infrastructure, community Page 86Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 4.3 Project Approach content, pedestrian / vehicular use, climate, adjacent improvements, linkages and project’s relationship to the City’s vision. These conditions are noted and graphically prepared to identify relational and spatial opportunities for the project design. Existing on-site improvements are analyzed for condition and potential impact upon future enhancements. We also assess the project site so that any inconspicuous conditions are uncovered prior to design efforts being undertaken. Other considerations are: Code Requirements and Identification and Formulation of Improvement/Enhancement Opportunities: Analysis of recreational/open space viability, linkages to adjacent spaces or circulation routes and accessibility from a transportation perspective. Collaboration with Stakeholders: Throughout the project and design phases, Miller Legg will maintain continual communication with stakeholders, soliciting their input on the design and process. This helps to establish the City’s, stakeholders’, and other users’ desires for the project, and outlines the project program clearly for all parties involved. The City of Sunny Isles Beach community has very active stakeholders whose input and support will be key to the any project’s success. Design Stage: In this third step, Miller Legg incorporates the analysis from the site evaluation, and combines that information with the stakeholder desires to develop the theme composition and material selection. We provide design documents in 3 phases, Conceptual, Preliminary, and Final. The Conceptual Design is a quick graphic format, to visually communicate the overall design intent and potential project site opportunities. Miller Legg will review concepts with the City to receive input on overall design intent. Our multi-disciplinary collaborative approach includes the Landscape Architectural Team reviewing concepts with Environmental, Planning, and Transportation / Engineering members to ensure that the concepts are truly “feasible.” This is necessary because concepts presented to The City and the MILLER LEGG’S CORPORATE TAGLINE, “IMPROVING COMMUNITIES. CREATING ENVIRONMENTS.”, CLEARLY DESCRIBES OUR DESIGN PHILOSOPHY, WHICH IS UTILIZED IN OUR EXTENSIVE PORTFOLIO OF MUNICIPAL STREETSCAPE, PARK, AND OPEN SPACE FACILITY PROJECTS. project’s stakeholders, need to be truly achievable project designs. Preliminary and Final Design Phase are developed upon City’s acceptance of a project concept. Preliminary design documents are prepared, including the designation of general material types for various hardscape and landscape elements and infrastructure improvements. Anticipated improvements will also be identified and presented, accurately scaled to demonstrate true spatial relations. A preliminary opinion of probable cost is generated to identify appropriate/available budgets for proposed enhancements. If the anticipated costs exceed the project budget, design modifications are addressed at this stage, rather than during the construction document phase. Preparation of Construction Documents: Construction documents, what the Contractor will use to construct the project, are prepared in accordance to the specifications outlines in the Final Design. Implementation and Construction: A key role for the designer, in this case, Miller Legg, is to provide contract administration and construction observation services to ensure the design is being implemented by the contractor in the way the City desires and Miller Legg intended. Miller Legg will conduct a review meeting with the City of Sunny Isles Beach and associated review agencies, prepare and distribute meeting minutes, so that appropriate parties are aware of issues to be addressed in future submittals. As construction documents continue to move through the development process, updated opinions of probable costs are also prepared at each submittal stage. When construction documents are at an appropriate percentage of completion, and comply with City budgets, the permitting process commences. Our Page 87Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 4.3 Project Approach in-house engineering and environmental services assist in strategically moving a project through permitting processes. Contract Administration / Bidding Assistance Phase: The Miller Legg Team will assist the City in preparation and clarification of questions related to bid documents by incorporating technical and design documents with standard City contract documents and conditions. Technical addendum during the bidding process can also be facilitated and prepared by the Miller Legg Team. As needed, Miller Legg will assist the City during the bid opening to tabulate the submitted bids, evaluate the bids for the appropriate responsiveness and document the rankings of the bidders. Construction Observation Phase: Miller Legg will assist the City in the observation and documentation required during construction to ensure that the project construction activities move forward as promptly as possible, while minimizing coordination activities between the City and contractor. This is facilitated by Miller Legg’s Team assisting the contractor in interpreting the design intent and construction documents. During construction, Miller Legg concisely documents all activities and key decisions or status changes that are observed during these activities with field reports, which are submitted to the City for review and documentation. This documentation is critical to ensure that each project meets schedules, and to avoid potential litigation/claims issues. The Firm provides construction observation services for all our projects and has experienced professionals who specialize in construction inspection. Miller Legg commits to the continuous availability of resources required to design, permit and coordinate the projects in accordance with the terms of this Continuing Services for Landscape Architectural Services THE MILLER LEGG TEAM HAS SUBSTANTIAL EXPERIENCE IN SUCCESSFULLY COMPLETING SIMILAR PROJECTS ON AN EXPEDITED SCHEDULE AND WITHIN BUDGET. contract and each project schedule. The members of our professional Team will be made available on an on-going and as-needed basis to contribute to the required tasks and will devote the necessary time needed to complete the project on time and within budget. PROJECT PLANNING & SCHEDULING As Miller Legg’s Project Manager, Brian Shore, RLA will conduct project kick-off sessions with Team members to discuss and review project objectives, client’s expectations, scopes and deliverables, budgets, schedules, constraints and limitations, background and other available information and guidelines for internal coordination, documentation and quality control/ assurance procedures. Depending upon the length and / or complexity of the project, status meetings will be held with the City’s Project Manager to review project goals, milestones, and delivery dates. In addition, we recommend a close-out meeting with City staff to review our Team’s execution of the project to ensure consistent performance or make adjustments to be applied to future work, if needed. For projects that require permits, we will proactively set up a review meeting with the permitting agency(ies) prior to their review cycle being completed to help address unnecessary comment letters and / or get a jumpstart on the response if any revisions may be necessary. Our Project Managers use Plantrax and/or Microsoft Project applications to prepare a detailed schedule of each milestone completion. This schedule is developed with input from every member of the Consultant and Client Teams to ensure commitment to the schedule. For each project effort, this timetable is completed upon Notice to Proceed and is transmitted to the Client Project Manager for review and acceptance. The process is tracked and updated as necessary. The Project Manager maintains and keeps all Team members on schedule. At BUDGET & SCHEDULING Page 88Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 4.3 Project Approach our weekly department meetings, the priority projects for the week are discussed and staffing coordination is planned. FAST TRACK / EXPEDITED BASIS With Miller Legg’s 57 years of municipal experience, our Team has the right ability and approach to handle the various tasks specified on a fast track or expedited basis. The Team has a strong understanding of the potential concerns that may arise during the life of projects under this Contract, and has worked with numerous communities clarifying and effectively implementing and resolving these and other similar issues in the course of our past projects. There will be no learning curve due to Miller Legg’s current and past experience. Miller Legg has recently completed numerous landscape architecture projects on an expedited basis including landscape architecture, hardscape and irrigation design for the City of Miami Beach 20th Street & Sunset Drive Pocket Park, the City of Miami Armbrister Park Community Center, and the City of Tamarac’s Commercial Boulevard landscape, hardscape and irrigation improvement project. The Miller Legg Team has tremendous depth with built in redundancy to handle multiple projects at the same time under this Contract. The Team has had many successes teamed together with public clients within South Florida. We also draw upon statewide and national experience to expedite and perform the specific tasks outlined in the Scope of Services for City of Sunny Isles Beach Landscape Architectural contract as follows: • Provision of signed and sealed drawings and specifications for landscaping construction projects • Develop bid specification for landscape maintenance services • Site master planning, analysis and design • Urban design plans/concept diagrams • Open space planning, analysis and design • Development of design guidelines • Development of Maintenance Standards • Perform landscape maintenance service inspections • Renderings • Beach and Dunescaping • Active and Passive Park Design • Irrigation Design, Operation and Maintenance • Median and Swale Landscaping Design • Streetscape planning, analysis and design • Natural resource planning, analysis and design • Cost estimates • Provide plans developed on AutoCAD’s latest version, and copies of a reproducible hard copy and CD of plans to the City • Feasibility analysis • Peer review analysis • Construction phase services including site inspections • Building Department plan and permit review • Permit assistance • Tree surveys • RER tree removal permitting • Attendance at meetings with City staff and presentations to City Commission • Provide construction administration if requested by the City • Prepare and submit signed and sealed construction drawings COST CONTROL We have several methods for ensuring that our designs remain within the Project Cost Budget that the City establishes. First, we uphold the project budget through strict observance of the project schedule and our quality assurance program because design flaws and delays usually result in construction cost overruns. Second, we complete a preliminary construction cost estimate at every submittal to check if our design is within the cost requirements or if value engineering alternatives can be incorporated without impacting the purpose set forth by the City. Third, changes in scope or design direction will be discussed with you to ensure that everyone understands the ramifications of that change on the construction cost budget. This attention to detail in our processes is the core of Miller Legg’s value engineering efforts. Constructability reviews and an understanding of the time needed for the construction to be completed allow us to guide the City in detailing these constraints in the contract documents. This ensures the schedule during Page 89Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 4.3 Project Approach construction is realistic and accomplishable without incurring acceleration costs or that these acceleration costs have been anticipated in the cost estimates where the need for expedited construction outweighs the higher costs associated. Finally, contractor-initiated value engineering options are thoroughly reviewed and discussed with our clients. It is critical to ensure that the quality and functionality of the project is not sacrificed by these requested changes and that consequential changes such as permit modifications are factored into a value engineering proposal to fully assess the benefits and potential pitfalls if the proposal is accepted. Miller Legg is committed to our Quality Control (QC) Program where our QC manager, William Schipske, reviews all work to ensure it meets high quality standards. Our Project Manager has 39 years of considerable experience managing complex, multiple task projects. As such, Miller Legg is committed to producing cost-efficient and high-quality deliverables through significant quality control procedures. Miller Legg has established a seven-stage quality assurance process. The seven (7) stages are interrelated in a sequence, which forms the quality control process logic. 1. Preparation of a project initiation form 2. Project kick-off meeting 3. Weekly Project Manager meetings 4. Project status & progress meetings 5. Draft deliverable review 6. Final deliverable review & delivery to client 7. Conducting post project debriefing & project close out 1. Project Initiation Form - The quality control process begins with the completion of a project initiation form. A project initiation form is prepared after the cost proposal has been negotiated and a contract has been executed. It must be reviewed by a Principal in the firm and submitted to the Department Manager for approval before it is distributed. The objectives of the project initiation form include the following: • Determine the contract type • Provide information such as the project location, methods of invoicing, and financial components of the project (labor, expenses, subcontracts, etc.) • Classify the project into the types of services being provided The preparation of the project initiation form ensures that the Contract has been executed and the budget and schedule has been prepared. It also establishes a point of contact for invoicing. 2. Project Kick-Off Meeting - Upon approval and distribution of the scope, budget and schedule, the project kick-off meeting is convened. Every project Team member comes to the meeting with questions and/or suggestions aimed at enhancing specific or all aspects of the project implementation process and leaves the meeting fully cognizant of their roles on the project Team – how their professional development and growth is enhanced by the tasks assigned to them, as well as how their performance on the project can be evaluated. Every Team member assigned a task(s) ensures that the resources needed to execute the task(s) are accounted for and provided. Report titles, their preparers, schedules, as well as peer reviewers are identified. In the case of statutory reports, the table of contents may already have been specified under the governing regulations. Similar details are established for studies and construction documents. 3. Project Status/Progress Meetings - Depending on the size, complexity, and client requirements, regular status/ progress meetings may be necessary during the life of the project. It is Miller Legg’s policy to hold regular (monthly) progress meetings at which all project Team members report on the progress of their activities, and the status QUALITY ASSURANCE / QUALITY CONTROL Page 90Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 4.3 Project Approach of scheduled deliverable preparation. This is the time when, if applicable, construction plans are reviewed for compliance with design standards, Americans with Disabilities Act (ADA) regulations, constructability, and neighborhood concerns. 4. Weekly Project Managers Meetings - Miller Legg has instituted weekly Project Manager meetings to review, assess and resolve short-term staffing situations, balance staff utilization and discuss general project related activities including invoicing, scheduling and deliverable issues. 5. Draft Deliverable Scheduling & Review - The draft deliverable may range from a Certified Arborist assessment/report to a set of landscape architecture design plans but should contain all pertinent information and data to make the deliverable complete. Miller Legg schedules necessary time to allow stakeholders to have an opportunity to comment on the deliverable draft. 6. Final Deliverable Scheduling & Review - In some cases, the deliverable may need to be submitted to the client, or outside agencies as “draft” for review comments before the final deliverable is issued. After incorporating the client’s comments, the final deliverable is issued for final release. 7. Post Project Debriefing/Project Closeout - After submitting the final deliverable to the client or the client’s designated depository, Brian Shore, RLA, as Project Manager, will schedule a post-project debriefing session with the project Team. The debriefing session considers all stages and all aspects of the project, such as: • Individual and subcontractor performance (if applicable) • Technical difficulties and their resolution • Regulatory and outside interfaces, • Lessons learned • Modifications needed • Budgetary considerations • Invoicing issues • Accounts receivable and profit/loss issues • Scheduling issues • Most particularly, individual and collective assessment / evaluation of the project implementation process and recommendations. The Project Manager will share the client’s comments with the Team and seeks to get the client’s final assessment in writing, as this may be useful in other projects as well as evaluating the project performance and Team. This session closes out the project. Miller Legg works with municipalities and other governmental agencies on projects for neighborhood infrastructure improvements and redevelopment projects, parks and recreational facilities, streetscapes, roadway and transportation projects, as well as healthcare, educational and aviation facilities. In addition, Miller Legg provides plan review services for traffic improvements as well as landscape architecture projects for numerous municipalities and the FDOT. From this experience, the Miller Legg Team works daily with public officials and stakeholders on a variety of projects and understands their needs for concise and timely information. Understanding that the City of Sunny Isles Beach projects will reflect multi-use demographics including residential, retail and commercial, it is essential that public awareness/outreach begins early in the design phase and is multi-faceted in its approach to reach all impacted stakeholders and build relationships and trustworthiness with the community. Our existing relationships with Cities, Counties, and other officials locally across South Florida provide us unique access to key stakeholders, and knowledge of existing concerns and issues that may impact the project. Goals of communication: 1. Actively inform and educate the community about the projects: process, timeline, expectations, and how problems can be solved or prevented. 2. Promote the benefits of improvements to the entire stakeholder community. PUBLIC INVOLVEMENT Page 91Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 4.3 Project Approach 3. Provide multiple and diverse means of communication, to reach the broadest base of the impacted stakeholder community. The Miller Legg Team has experience, both globally and locally, in projects that heavily affect the public. Our intent is to mitigate any negative impact to surrounding businesses and identify strategies that will allow them to continue operating as efficiently as possible. Our Team recognizes the need to proactively inform property owners and others of the benefits of the project along with subsequent construction impacts. Performing proper due diligence in order to understand the demographics and concerns of the community is critical to ensuring work progresses without costly delays. To facilitate this, our Team will closely coordinate with City officials and all other necessary individuals. We have successfully implemented these procedures on several projects, including the City of Miami La Pastorita Neighborhood Roadway Improvements Study, City of Miami Biscayne Boulevard Streetscape, City of Miami Fairlawn Community Park, South Miami Parks and Recreation Master Plan, Miami-Dade Aviation Department (MDAD) Central Boulevard Landscape Master Plan and numerous FDOT projects. COMMUNICATION & REPORTING Communication and the ability to establish efficient coordination between the City and the Miller Legg Team will be key to successful execution of projects anticipated under this Continuing Services Contract. Our Project Manager will utilize formal submittals of documents, face-to-face, telephone and email communication as appropriate for the type of issue to be communicated during the span of a project. At the commencement of this contract, Miller Legg will provide the City of Sunny Isles Beach with contact information for key personnel, including phone numbers, cellular phone numbers and email addresses to allow the best possible access to the people doing the work. We also know that proper communication of expectations and progress throughout the life of each project is the cornerstone to building trust. Because the complexity and duration of task assignments often dictate the level of communication warranted, we will work with the City Project Manager(s) and staff to tailor our reporting structure for each task order to meet your expectations. Our Team is available to work extended hours as necessary to complete each project task on schedule and within budget. TECHNICAL Utilization of the right software is crucial to communicate the projects design intent to the audience. Miller Legg has full capabilities to develop all levels of computer aided design (CAD), including the current versions of AutoCAD, Microstation, Land FX and Impression. In addition, the Firm utilizes graphic software to generate the exhibits necessary to communicate a project’s intent using Lumion, ESRI (GIS) SketchUp, Adobe Creative Suite and Maxwell Render software. We have successfully utilized these resources to prepare community involvement, design and permitting documents for current and past RESOURCES Lumion 3D Rendering Page 92Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 4.3 Project Approach projects at the City of Miami’s Moore Park, Kennedy Park and Morningside Park projects, and most recently for the design improvements of the City of Coral Gables War Memorial Park project. ADDITIONAL IN-HOUSE CAPABILITIES As mentioned earlier in our qualifications, Miller Legg is a statewide award-winning consulting firm that brings together the elements of landscape architecture, planning, engineering, surveying, environmental wetlands consulting, and geographic information systems services. For this Landscape Architecture Consulting Services contract, Miller Legg has proposed utilizing our in- house capabilities of landscape architects and designers. The firm’s landscape architecture services include: recreational and commercial planning, hardscape, irrigation, urban design, streetscape, planting, project theming, signage & graphic design, contract administration, construction observation services, plan review, horticultural consulting and arboriculture. The firm’s arborist consulting services include: tree species identification/ inventories, tree surveys and mapping, destroyed/damaged tree assessments and value estimates, tree grading, tree species selection, mangrove trimming oversight and tree permitting. We have been recognized as the premiere landscape architectural firm for municipal and private sector facilities and have received dozens of awards in support of this. Supporting service staff, including certified arborists, certified landscape inspectors, environmental specialists lighting engineers and technicians, as well as surveyors and survey technicians/SUE staff will also be at hand to assist in achieving the objectives and scope of services for this consulting Contract for the City. In addition to these services mentioned above, Miller Legg has significant in- house experience in South Florida providing, Planning, Civil Engineering, Traffic Engineering, Plans Review, and GIS. Many of the representative landscape architecture projects included in our projects experience listing also include civil engineering, traffic, planning and environmental components. We are committed to providing the City of Sunny Isles Beach an unmatched quality service. Award winning Biscayne Boulevard Streetscape (FDOT) District 6, Miami, FL Page 93Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 4.4 Florida Statute 287.055 Certified Minority Business Enterprise Certification Although Miller Legg is not a Certified Minority Business Enterprise as defined by the Florida Small and Minority Business Assistance Act, we are a Federal Small Business Florida Department of Transportation. As part of Miller Legg’s Affirmative Action Plan, there is an established commitment to utilize minority and women- owned companies in the normal course of our business, which includes Small Disadvantaged Business Enterprises (SDBEs) as subconsultants, and as suppliers of goods and services. More than 57% of our own staff includes minorities and women. The company maintains an extensive list of teaming partners, including minority- owned businesses in Miami-Dade, Broward and Palm Beach Counties. We often exceed required goals and provide subconsultant diversity monitoring reports to regulatory agencies as required. Miller Legg teams or has teamed with the following minority-owned businesses in Miami-Dade, Broward & Palm Beach Counties: Black-owned businesses •Brown & Phillips, Inc. (Surveying) – Palm Beach •Dickey Consulting Services, Inc. (Public/ Government Relations) - Broward •EAC Consulting, Inc. (Engineering) – Miami-Dade & Broward •Gator Engineering, Inc. (Engineering) – Broward •EBS Engineering (Engineering) – Miami-Dade Hispanic-owned businesses •BCC Engineering, Inc. (Engineering) – Miami Dade •Basulto Management Consultants (Engineering) – Broward County •Bolton Perez & Associates (Engineering) – Miami Dade •Borrelli & Partners (Architecture) – Miami-Dade •Delta G Consulting Engineering, Inc. (Structural Engineering) – Broward •Milian Swain & Associates (Engineering) – Miami- Dade •Ocampo & Associates, Inc. (Architecture) – Broward •R.J. Behar & Company, Inc. (Engineering) – Miami- Dade & Broward •Tierra Florida, Inc. (Geotechnical Engineering) – Palm Beach •CES Consultants, Inc. (Engineering) – Miami-Dade •CH Perez & Associates (Engineering & Traffic) – Miami-Dade •AES Engineering, Inc. (Engineering) – Miami-Dade •A&P Consulting Transportation Engineers (Engineering) – Miami-Dade •ATEC Transportation (Engineering) – Miami-Dade •Pevida Highway Designers (Engineering) – Miami- Dade Woman-owned businesses •Southern Resource Mapping (Mapping/ Photogrammetry) – Miami-Dade •Holland Engineering (Engineering) - Broward •Garth Business Solutions (Community Outreach) - Broward •Nova Consulting, Inc. (Engineering) – Broward •Masuen Consulting (Irrigation) - Broward •Ross Engineering (Engineering) – Broward •AirQuest Environmental (Environmental) – Broward Page 94Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 4.5 Past Performance - References City of Tamarac | Roadway Landscape Master Plan Robert Johnson City Planner 7525 NW 88th Avenue Tamarac, FL 33321 Robert.Johnson@tamarac.org 954.597.3533 City of Oakland Park | East Dog Park Sierra Marrero Assistant Director of Engineering and Building Services 5399 N. Dixie Highway, Suite 3 Oakland Park, FL 33334 sierra.marrero@oaklandparkfl.gov 954.630.4479 Miami-Dade County Parks, Recreation & Open Space (PROS) | Equitable Distribution Program Continuous Professional Services Agreement Hong Yun, RLA, LEED AP Landscape Architect 275 NW 2nd Avenue, 4th Floor Miami, FL 33128 hongbum.yun@miamidade.gov 305.755.7922 Additional references for your consideration: Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA Page 955. Contract forms Page 96Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 5. Contract Forms City of Sunny Isles Beach | 25 SECTION 6 BID FORM 1 RFP Title: LANDSCAPE ARCHITECT SERVICES The undersigned Vendor proposes and agrees, if this Bid is accepted, to enter into an agreement with The City of Sunny Isles Beach to perform and furnish all Services as specified or indicated in the Contract Documents for the Contract Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. The vendor accepts all of the terms and conditions of this RFQ and Instructions to Vendors. This RFQ will remain subject to acceptance for 90 days after the day of RFQ opening. The Proposer agrees to sign and submit the Agreement with other documents required by the Bidding Requirements within ten days after the date of the City’s Notice of Award. In submitting this RFQ, the Vendor represents, as more fully set forth in the Agreement, that: The Vendor has familiarized himself/herself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Law and Regulations that in any manner may affect cost, progress, performance, or furnishing of the Work. The Vendor has given the City written notice of all conflicts, errors, discrepancies that it has discovered in the Contract Documents and the written resolution thereof by City is acceptable to the Vendor. This RFQ is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation; the vendor has not directly or indirectly induced or solicited any other Vendor to submit a false or sham RFP; the vendor has not solicited or induced any person, firm or corporation to refrain from Bidding; and vendor has not sought by collusion to obtain for itself any advantage over any other Vendor or over the City. The Proposer understands and agrees that the Bid is for unit prices to furnish and install individual Work Items for maintenance and/or repair work, complete in place. Estimates are provided for the purposes of Bid Evaluation and to establish unit prices for individual Work to be contracted by the City under individual Purchase Orders, based on the unit prices established under this RFQ. The City and the successful Proposer will establish completion times for each individual Work Item and the successful Proposer agrees that the work will be completed within the time frames agreed upon and stipulated in the individual Purchase Orders and/or Notice to Proceed. Page 97Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA City of Sunny Isles Beach | Firm Name: _____________________________________________________________________________ Street Address: _____________________________________________________________________________ Mailing Address (if different): _____________________________________________________________________________ Telephone No. _______________________________ Fax No. _________________________ Email Address: _______________________________ FEIN No. __/__-__/__/__/__/__/__/__ *“By signing this document the bidder agrees to all Terms and conditions of this Request for Qualifications. Signature: __________________________________________________________________ (Signature of authorized agent) Print Name: ____________________________________ Title: _________________________________________ THE EXECUTION OF THIS FORM CONSTITUTES THE UNEQUIVOCAL OFFER OF PROPOSER TO BE BOUND BY THE TERMS OF ITS PROPOSAL. FAILURE TO SIGN THIS SOLICITATION WHERE INDICATED ABOVE BY AN AUTHORIZED REPRESENTATIVE SHALL RENDER THE PROPOSAL NON- RESPONSIVE. THE CITY MAY, HOWEVER, IN ITS SOLE DISCRETION, ACCEPT ANY PROPOSAL THAT INCLUDES AN EXECUTED DOCUMENT WHICH UNEQUIVOCALLY BINDS THE PROPOSER TO THE TERMS OF ITS OFFER. Miller Legg 1845 NW 112th Avenue, Suite 211, Miami, FL 33172 Same as above 305.599.6381 954.493.6539 mkroll@millerlegg.com 6 5 0 5 6 3 4 6 7 Michael D. Kroll, RLA, FASLA President 5. Contract Forms Page 98Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA City of Sunny Isles Beach |Request for Qualifications No. 22-06-01 26 ACKNOWLEDGEMENT OF ADDENDA INSTRUCTIONS: COMPLETE PART I OR PART II, WHICHEVER APPLIES PART I: LIST BELOW ARE THE DATES OF ISSUE FOR EACH ADDENDUM RECEIVED IN CONNECTION WITH THIS RFQ Addendum #1, Dated Addendum #2, Dated Addendum #3, Dated Addendum #4, Dated Addendum #5, Dated Addendum #6, Dated Addendum #7, Dated Addendum #8, Dated PART II: NO ADDENDUM WAS RECEIVED IN CONNECTION WITH THIS RFQ FIRM NAME: AUTHORIZED SIGNATURE: DATE: TITLE OF OFFICER: Miller Legg Michael D. Kroll, RLA, FASLA, President 6/29/22 5. Contract Forms Thursday, June 23, 2022 Page 99Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 5. Contract Forms 1 of 8 NON-COLLUSION AFFIDAVIT City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 STATE OF FLORIDA ) ) COUNTY OF _____________) The undersigned being first duly sworn as provided by law, deposes, and says: This Affidavit is made with the knowledge and intent that it is to be filed with the City of Sunny Isles Beach City Commission and that it will be relied upon by said County, in any consideration which may give to and any action it may take with respect to this Bid. The undersigned is authorized to make this Affidavit on behalf of, _____________________________________________________________ (Name of Corporation, Partnership, Individual, etc.) a, ________________________________, formed under the laws of _____________ (Type of Business) (State) of which he is ________________________________________________. (Sole Owner, Partner, President, etc.) Neither the undersigned nor any person, firm, or corporation named above nor anyone else to the knowledge of the undersigned, have themselves solicited or employed anyone else to solicit favorable action for this Bid by the City, also that no head of any department or employee therein, or any officer of the City of Sunny Isles Beach, Florida is directly interested therein. This Bid is genuine and not collusive or a sham; the person, firm or corporation named above has not colluded, conspired, connived or agreed directly or indirectly with any proposers or person, firm or corporation, to put in a sham Bid, or that such person, firm or corporation, shall refrain from Bidding, and has not in any manner, directly or indirectly, sought by agreement or collusion, or communication or conference with any person, firm or corporation, to fix the prices of said Bid or Bids of any other proposers; and all statements contained in the Bid or Bids described above true; and further; neither the undersigned, nor the person, firm or corporation named above has directly or indirectly submitted said Bid or the contents thereof, or divulged information or data relative thereto, to any association or to any member or agent thereof. ___________________________________ ___________________________________ AFFIANT’S NAME AFFIANT’S TITLE TAKEN, SWORN AND SUBSCRIBED TO BEFORE ME this _____ day of _______________________, 20 _. Personally Known ________ or Produced Identification ________; Type of identification ___________________________________ (Affix seal here) ___________________________________ NOTARY PUBLIC (name printed or typed) Miami-Dade Miller Legg Corporation Florida President Michael D. Kroll, RLA, FASLA President 29 June 22 X Marina Hannwacker Page 100Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 2 of 8 PUBLIC ENTITY CRIMES City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a) FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES PUBLIC ENTITY CRIMES Pursuant to the provisions of paragraph (2) (a) of Section 287.133, Florida State Statutes - "A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a Bid on a Contract to provide any goods or services to a public entity, may not submit a Bid on a Contract with a public entity for the construction or repair of a public building or public Work, may not submit Bids on leases of real property to a public entity, may not be awarded to perform Work as a Contractor, supplier, Sub-Contractor, or Consultant under a Contract with any public entity, and may not transact business with any public entity in excess of the threshold amount Category Two of Sec. 287.017, FS for thirty six months from the date of being placed on the convicted vendor list". THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS. 1.This sworn statement is submitted to City of Sunny Isles Beach _____________ by____________________________________________________________________________ [print individual’s name and title] for____________________________________________________________________________ [print name of entity submitting sworn statement] whose business address is: _______________________________________________________________________________ _______________________________________________________________________________ and (if applicable) its Federal Employer Identification number (FEIN) is_____________________. (If the entity had no FEIN, include the Social Security Number of the individual signing this sworn statement:_________________________________.) 2.I understand that a "public entity crime" as defined in Paragraph 287.133(1)(g), Florida Statutes, means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or with the United States, including, but not limited to, any Bid or Contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation. 3.I understand that "convicted" or "conviction" as defined in Para. 287.133(1)(b), Florida Statutes, means a finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trail court of record relating to charges brought by indictment or information after July 1, 1989, as a result of a jury verdict, non-jury trial, or entry of a plea of guilty or nolo contendere. 4.I understand that an "affiliate" as defined in Para. 287.133(1)(a), Florida Statutes, means: a.) predecessor or successor of a person convicted of a public entity crime; or b.) Any entity under the control of any natural person who is active in the management of the entity and who has been convicted of a public entity crime. The term "affiliate" includes those officers, directors, executors, partners, shareholders, employees, members, and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair Michael D. Kroll, RLA, FASLA, President Miller Legg 1845 NW 112th Avenue, Suite 211, Miami, FL 33172 65-0563467 5. Contract Forms Page 101Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 3 of 8 market value under an arm's length agreement, shall be a prime facie case that one person controls another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall be considered an affiliate. 5.I understand that a "person" as defined in Para. 287.133(1)(e), Florida Statutes, means any natural person or entity organized under the laws of any state or of the United States with the legal power to enter into a binding Contract and which Bids or applies to Bid on Contracts for the provision of goods or services let by a public entity, or which otherwise transacts or applies to transact business with a public entity. The term "persons" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in management of any entity. 6.Based on information and belief, the statement which I have marked below is true in relation to the entity submitting this sworn statement. (Indicate which statement applies.) ____ Neither the entity submitting this sworn statement, nor any of it's officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, nor any affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. ____ The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. ____ The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. However, there has been a subsequent proceeding before a Hearing Officer of the State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer of the State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer determined that it was not in the public interest to place the entity submitting this sworn statement on the convicted vendor list. (Attach a copy of the final order.) I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 1 (ONE) ABOVE IS FOR THAT PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED. I ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES, FOR CATEGORY TWO OF ANY, CHANGE IN THE INFORMATION CONTAINED IN THIS FORM. By: ______________________________________ (Signature) ______________________________________ (Printed Name) ______________________________________ (Title) Sworn to and subscribed before me this ______ day of_______________________, 20_____, by __________________________________________________. (AFFIX NOTARY STAMP HERE) ______________________________________ Signature: Notary Public – State of Florida ______________________________________ Print or Type Commissioned Name Personally Known __________ OR Produced Identification __________ Type of Identification Produced ________________________________ X Michael D. Kroll, RLA, FASLA President 29 June 22 Marina Hannwacker X 5. Contract Forms Page 102Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 4 of 8 EQUAL OPPORTUNITY / AFFIRMATIVE ACTION City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 EQUAL OPPORTUNITY/AFFIRMATIVE ACTION STATEMENT The contractors and all subcontractors hereby agree to a commitment to the principles and practices of equal opportunity in employment and to comply with the letter and spirit of federal, state, and local laws and regulations prohibiting discrimination based on race, color, religion, national region, sex, age, handicap, marital status, and political affiliation or belief. Signed: ________________________________________ Title: ________________________________________ Firm: ________________________________________ Address: ________________________________________ ________________________________________ President Miller Legg 1845 NW 112th Avenue, Suite 211 Miami, FL 33172 5. Contract Forms Page 103Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 5 of 8 C O N F L I C T O F I N T E R E S T City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles each, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 CONFLICT OF INTEREST STATEMENT The award of any contract hereunder is subject to the provisions of Chapter 112, Florida State Statutes. Proposers must disclose with their Bids, the name of any officer, director, partner, associate or agent who is also an officer or employee of the City of Sunny Isles Beach or its agencies. STATE OF FLORIDA COUNTY OF ________________________ BEFORE ME, the undersigned authority, personally appeared __________________________________________ , who was duly sworn, deposes, and states: 1.I am the _________________________ of __________________________________________ with a local office in ______________________________________________________________________ and principal office in ___________________________________________________________________________________________. 2.The above named entity is submitting a proposal for the City of Sunny Isles Beach, RFQ No. _________________ described as _________________________________________________________. The Affiant has made diligent inquiry and provides the information contained in this Affidavit based upon his own knowledge. 3.The Affiant states that only one submittal for the above Bid is being submitted and that the above named entity has no financial interest in other entities submitting Bids for the same project. 4.Neither the Affiant nor the above named entity has directly or indirectly entered into any agreement, participated in any collusion, or otherwise taken any action in restraints of free competitive pricing in connection with the entity’s submittal for the above Bid. This statement restricts the discussion of pricing data until the completion of negotiations if necessary and execution of the Contract for this project. 5.Neither the entity nor its affiliates, nor anyone associated with them, is presently suspended or otherwise ineligible from participation in contract letting by any local, State, or Federal Agency. 6.Neither the entity, nor its affiliates, nor anyone associated with them have any potential conflict of interest due to any other clients, contracts, or property interests for this project. 7.I certify that no member of the entity’s ownership or management is presently applying for any employee position or actively seeking an elected position with the City of Sunny Isles Beach. 8.I certify that no member of the entity’s ownership or management, or staff has a vested interest in any aspect of the City of Sunny Isles Beach. 9.In the event that a conflict of interest is identified in the provision of services, I, on behalf of the above named entity, will immediately notify the City of Sunny Isles Beach.Dated this __________ day of __________________________________, 20____. ____________________________________________ ____________________________________ AFFIANT Print or Type Name and Title Sworn to and subscribed before me this __________ day of ______________________________, 20____. Personally Known, OR Produced Identification - Type of Identification ____________________________________________ NOTARY PUBLIC STATE OF FLORIDA _______________________________________________________ Miami-Dade Michael D. Kroll, RLA, FASLA President Miller LeggMiami Fort Lauderdale 22-06-01 Continuing Services for Landscape Architectural Services CCNA 29th June 22 Michael D. Kroll, RLA, FASLA, President 29th June 22 X 5. Contract Forms Page 104Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 6 of 8 DISPUTE DISCLOSURE City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 DISPUTE DISCLOSURE FORM Answer the following questions by placing a “X” after “Yes” or “No”. If you answer “Yes”, please explain in the space provided, or on a separate sheet attached to this form. 1.Has your firm or any of its officers, received a reprimand of any nature or been suspended by the Department of Professional Regulations or any other regulatory agency or professional associations within the last five (5) years? YES __________ NO __________ 2.Has your firm, or any member of your firm, been declared in default, terminated or removed from a contract or job related to the services your firm provides in the regular course of business within the last five (5) years? YES __________ NO __________ 3.Has your firm had against it or filed any requests for equitable adjustment, contract claims, Bid protests, or litigation in the past five (5) years that is related to the services your firm provides in the regular course of business? YES __________ NO __________ If yes, state the nature of the request for equitable adjustment, contract claim, litigation, or protest, and state a brief description of the case, the outcome or status of the suit and the monetary amounts of extended contract time involved. I hereby certify that all statements made are true and agree and understand that any misstatement or misrepresentation of falsification of facts shall be cause for forfeiture of rights for further consideration of this Bid for the City of Sunny Isles Beach. ________________________________________ ______________________________________ Firm Date ________________________________________ _______________________________________ Authorized Signature Print or Type Name and Title X X X Miller Legg June 29, 2022 Michael D. Kroll, RLA, FASLA 5. Contract Forms Nature of claim: Alleged economic loss Amount in dispute: Confidential amount within the Professional Liability insurance limits Parties: Isles of Oviedo Townhomes Owners’ Association / Miller Legg Case Number: Seminole County 2020-CA-001243-11E-L Status: In Litigation *see below Page 105Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 7 of 8 ANTI-KICKBACK City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 949-3113 ANTI-KICKBACK AFFIDAVIT STATE OF FLORIDA ) ) COUNTY OF ___________ ) I, the undersigned, hereby duly sworn and deposed say that no portion of this sum herein Bid will be paid to any employees of the City of Sunny Isles Beach or its elected officials as a commission, kickback, reward or gift, directly or indirectly by me or any member of my firm or by an officer of the corporation. By: ________________________________ Title: ________________________________ The foregoing instrument was acknowledged before me this _____ day of __________________, 20____, by _________________________________________ [name of person], as __________________________________ [type of authority], for ________________________________ [name of party on behalf of whom instrument was executed]. AFFIX NOTARY STAMP HERE: _______________________________ Notary Public – State of Florida ________________________________ Print or Type Commissioned Name Personally Known __________ OR Produced Identification __________ Type of Identification Produced ________________________________ Miami-Dade Michael D. Kroll, RLA, FASLA President 29th June 22 Michael D. Kroll, RLA, FASLA President Miller Legg Marina Hannwacker X 5. Contract Forms Page 106Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA E-Verify Affidavit Florida Statute 448.095 directs all public employers, including municipal governments, to verify the employment eligibility of all new public employees through the U.S. Department of Homeland Security’s E- Verify System, and further provides that a public employer may not enter into a contract unless each party to the contract registers with and uses the E-Verify system. Florida Statute 448.095 further provides that if a contractor enters into a contract with a subcontractor, the subcontractor must provide the contractor with an affidavit stating that the subcontractor does not employ, contract with, or subcontract with an unauthorized alien. In accordance with Florida Statute 448.095, all contractors doing business with the City of Sunny Isles Beach are required to verify employee eligibility using the E -Verify system for all existing and new employees hired by the contractor during the contract term. Further, the contractor must also require and maintain the statutorily required affidavit of its subcontractors. It is the responsibility of the awarded vendor to ensure compliance with E-Verify requirements (as applicable). To enroll in E-Verify, employers should visit the E-Verify website (https://www.e-verify.gov/employers/enrolling-in-e-verify) and follow the instructions. The contractor must, as usual, retain the I-9 Forms for inspection. By affixing your signature below you hereby affirm that you will comply with E-Verify requirements. Company Name Offeror Signature Date Print Name Title Federal Employer Identification Number (FEIN) Notary Public Information Sworn to and subscribed before me on this this day of , 2022. By Is personally known to me Has produced identification (type of identification produced: ) Signature of Notary Public Print or Stamp of Notary Public Expiration Date 8 of 8 Miller Legg June 29, 2022 Michael D. Kroll, RLA, FASLA President 65-0563467 29 June Marina Hannwacker X 03/13/2026 5. Contract Forms Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 6. Exceptions Page 107 Page 108Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA 6. Exceptions Miller Legg takes exception to the following as they are not in compliance with FL Statute 725.08 and is uneforceable. Indemnity provision section 1.26 on page 5: HOLD HARMLESS/INDEMNIFICATION: The Firm shall indemnify, hold harmless, and defend the City of Sunny Isles Beach, it’s officers, agents and employees from and against any claims, demands or causes of action of whatsoever kind or nature arising out of error, omission, negligent act, conduct, or misconduct of the Contractor, their agents, servants or employees in the provision of goods or the performance of services pursuant to this RFQ and / or from any procurement decision of the City including without limitation, awarding the Contract to the Firm. Indemnity provision section 1.35 on page 7: DUTY TO DEFEND, INDEMNIFY AND SAVE HARMLESS: In consideration of the separate sum of twenty-five dollars ($25.00) and other valuable consideration, the Firm shall defend, indemnify and hold harmless the City, its officers, agents and employees, from or on account of any injuries or damages, received or sustained by any person or persons during or on account of any operations connected with the Work described in the Contract Documents, or by or in consequence of any negligence in connection with the same; or by use of any improper materials or by or on account of any act or omission of the said Firm, agents, servants or employees. The Firm will defend, indemnify and hold harmless the City and their agents or employees from and against all claims, damages, losses and expenses including attorneys’ fees arising out of or resulting from the performance of the Work, provided that any such claim damage, loss or expense (a) is attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property (other than Work itself) including the loss of use resulting wherefrom and (b) is caused in whole or in part by any negligent act or omission of the Firm or anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not it is caused by a party indemnified hereunder. In the event that a court of competent jurisdiction determines that Sec. 725.06 (2), F.S. is applicable to this Work, then in lieu of the above provisions of this section the parties agree that Firm shall indemnify, defend and hold harmless the City, their officers and employees, to the fullest extent authorized by Sec. 725.06 (2) F.S., which statutory provisions shall be deemed to be incorporated herein by reference as if fully set forth herein. In the event that any action or proceeding is brought against City by reason of any such claim or demand, Firm, upon written notice from City shall defend such action or proceeding by counsel satisfactory to City. The indemnification provided above shall obligate Firm to defend at its own expense or to provide for such defense, at City’s option, any and all claims of liability and all suits and actions of every name and description that may be brought against City, excluding only those which allege that the injuries arose out of the sole negligence of City, which may result from the operations and activities under this Contract whether the Work be performed by Firm or by anyone directly or indirectly employed by either. Contact: Michael Kroll, RLA, FASLA, President 1845 NW 112th Avenue, Suite 211 Miami,FL 33172 mkroll@millerlegg.com 305.599.6381