HomeMy WebLinkAboutMiller Legg Response to RFQ No 22-06-01 Continuing Services for Landscape Architectural Services CCNARequest for Qualifications
RFQ No. 22-06-01
CONTINUING SERVICES FOR
LANDSCAPE ARCHITECTURAL SERVICES CCNA
June 29, 2022
Miller Legg Proposal 22-P0228
COPY
June 29, 2022
City Clerk
City of Sunny Isles Beach
Governmental Center
18070 Collins Avenue, 4th Floor
Sunny Isles Beach, FL 33160
CONTINUING SERVICES FOR LANDSCAPE ARCHITECTURAL SERVICES
RFQ #22-06-01
Dear Selection Committee:
Miller Legg is very pleased to submit our qualifications for your consideration in the selection of Landscape
Architecture consultants for Sunny Isles Beach, “The City of Sun and Sea”. This submittal details our firm’s
qualifications, capabilities, team members and relevant experience.
Miller Legg has provided landscape architecture and consulting services for municipal projects over the last 57
years. Our firm provides a knowledgeable Team of experienced professionals and a staff of 50 dedicated
employees who are committed to satisfying the needs of Sunny Isles Beach. Our Miami-Dade office will afford
you the local presence, responsiveness and continuity to fulfill this Contract.
Miller Legg has successfully provided continuing contract services to many South Florida municipalities over the
past 57 years including: Miami, Miami Beach, Miami Lakes, Coral Gables, Homestead, Fort Lauderdale, Lauderhill,
Pembroke Pines, Coral Springs, Coconut Creek, Tamarac, Oakland Park, Plantation, Pompano Beach, Dania Beach,
Hollywood, Miramar, as well as similar county, school board, and Florida Department of Transportation (FDOT) contracts
in the tri-county region. We look forward to continuing this tradition by serving the City of Sunny Isles Beach
as your trusted consultant for Landscape Architectural services under this
Contract.
Miller Legg has been responsible for many award-winning landscape architecture
projects in South Florida and Miami-Dade County. Our relationship with the City
of Sunny Isles Beach includes the award-winning design of Pelican Community
Park, for which we provided landscape architecture, irrigation, engineering,
surveying, grant assistance and construction observation. In addition, we
supported the reconstruction of existing natural turf fields to artificial turf at both
Pelican Community Park and Senator Gwen Margolis Park. This experience
combined with our firm’s extensive portfolio of representative beautification and
improvement projects corresponds to key elements described in this solicitation’s
scope of services. For this compelling reason, we are confident that we will deliver
to you the landscape architecture skills, experience and professional integrity
necessary to successful project performance.
As Principal-in-Charge, I will collaborate extensively with Project Manager Brian Shore,
RLA, and Assistant Project Manager, Miguel Juncal, RLA, CA. With an extensive
background in landscape architecture and land planning, I assure you that our
Team will provide landscape architectural designs that are functional, feasible,
aesthetically pleasing while reflecting upon Sunny Isles Beach history and
considering a resilient future. For this Contract, we have assembled a body of
landscape architecture expertise from within the firm with a strong collective
background in serving public clients in South Florida.
In Brief…
Our Landscape Architecture
Services:
Recreational Planning
Hardscape & Urban
Design
Design Guidelines &
Standards
Streetscape
Project Theming &
Signage
Horticultural Consulting
& Arboriculture
Planting Design
Irrigation Design
Landscape Inspection
Services
Master Planning
Grants Application
Plans Review
Contract Administration Construction Observation
Page 2
Page 3Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
I assure you that the City will have the Miller Legg Team’s corporate commitment of staff and resources for any
of the projects under this consulting Contract. Should you require any additional information, please don’t
hesitate to contact me at (305) 599-6381 or email at mkroll@millerlegg.com. We very much appreciate the
opportunity to present our credentials to you in the following qualifications package.
Sincerely,
Michael D. Kroll, RLA, FASLA
President of Miller Legg
Principal-in-Charge
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA Page 41. Cover Page
Page 5Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
1. Cover Page
Response to:
City of Sunny Isles Beach
Request for Qualifications #22-06-01
Continuing Services Landscape Architectural Services CCNA
Submitted by:
Miller Legg
Michael Kroll, RLA, FASLA, President
1845 NW 112th Avenue, Suite 211
Miami, FL 33172
305.599.6381
mkroll@millerlegg.com
June 29, 2022
Miller Legg has extensive experience in providing the services that may be performed under this Contract.
These services include, but are not limited to, landscape architecture, conceptual design, design development,
site plan review, preparation of documents and permitting services. Miller Legg commits to providing the
staff and resources for any of the projects under this consulting contract and perform these services within
the City’s required time frame.
Miller Legg believes we are the best qualified firm to provide landscape architectural services to Sunny Isles
Beach. We have provided landscape architecture and consulting services for municipal projects over the last
57 years. Our firm provides a knowledgeable Team of experienced professionals and a staff of 50 dedicated
employees who are committed to satisfying the needs of Sunny Isles Beach. With a Miami-Dade office, we
can afford you the local presence, responsiveness and continuity to fulfill this Contract. Lastly, Miller Legg
successfully delivered the award winning Pelican Community Park and received recognition from the City for
our involvement in the design completion of the Park.
Page 6Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
1. Cover Page
City of Sunny Isles Beach | 25
SECTION 6
BID FORM 1
RFP Title: LANDSCAPE ARCHITECT SERVICES
The undersigned Vendor proposes and agrees, if this Bid is accepted, to enter into an agreement with The City of
Sunny Isles Beach to perform and furnish all Services as specified or indicated in the Contract Documents for the
Contract Price and within the Contract Time indicated in this Bid and in accordance with the other terms and
conditions of the Contract Documents.
The vendor accepts all of the terms and conditions of this RFQ and Instructions to Vendors. This RFQ will
remain subject to acceptance for 90 days after the day of RFQ opening. The Proposer agrees to sign and
submit the Agreement with other documents required by the Bidding Requirements within ten days after the
date of the City’s Notice of Award.
In submitting this RFQ, the Vendor represents, as more fully set forth in the Agreement, that:
The Vendor has familiarized himself/herself with the nature and extent of the Contract
Documents, Work, site, locality, and all local conditions and Law and Regulations that in
any manner may affect cost, progress, performance, or furnishing of the Work.
The Vendor has given the City written notice of all conflicts, errors, discrepancies that it
has discovered in the Contract Documents and the written resolution thereof by City is
acceptable to the Vendor.
This RFQ is genuine and not made in the interest of or on behalf of any undisclosed
person, firm or corporation and is not submitted in conformity with any agreement or
rules of any group, association, organization, or corporation; the vendor has not directly
or indirectly induced or solicited any other Vendor to submit a false or sham RFP; the
vendor has not solicited or induced any person, firm or corporation to refrain from
Bidding; and vendor has not sought by collusion to obtain for itself any advantage over
any other Vendor or over the City.
The Proposer understands and agrees that the Bid is for unit prices to furnish and install individual Work Items
for maintenance and/or repair work, complete in place. Estimates are provided for the purposes of Bid Evaluation
and to establish unit prices for individual Work to be contracted by the City under individual Purchase Orders,
based on the unit prices established under this RFQ.
The City and the successful Proposer will establish completion times for each individual Work Item and the
successful Proposer agrees that the work will be completed within the time frames agreed upon and stipulated
in the individual Purchase Orders and/or Notice to Proceed.
Page 7Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
City of Sunny Isles Beach |
Firm Name:
_____________________________________________________________________________
Street Address:
_____________________________________________________________________________
Mailing Address (if different):
_____________________________________________________________________________
Telephone No. _______________________________ Fax No. _________________________
Email Address: _______________________________ FEIN No. __/__-__/__/__/__/__/__/__
*“By signing this document the bidder agrees to all Terms and conditions of this Request for
Qualifications.
Signature:
__________________________________________________________________
(Signature of authorized agent)
Print Name: ____________________________________
Title: _________________________________________
THE EXECUTION OF THIS FORM CONSTITUTES THE UNEQUIVOCAL OFFER OF PROPOSER TO BE
BOUND BY THE TERMS OF ITS PROPOSAL. FAILURE TO SIGN THIS SOLICITATION WHERE
INDICATED ABOVE BY AN AUTHORIZED REPRESENTATIVE SHALL RENDER THE PROPOSAL NON-
RESPONSIVE. THE CITY MAY, HOWEVER, IN ITS SOLE DISCRETION, ACCEPT ANY PROPOSAL THAT
INCLUDES AN EXECUTED DOCUMENT WHICH UNEQUIVOCALLY BINDS THE PROPOSER TO THE
TERMS OF ITS OFFER.
Miller Legg
1845 NW 112th Avenue, Suite 211, Miami, FL 33172
Same as above
305.599.6381 954.493.6539
mkroll@millerlegg.com 6 5 0 5 6 3 4 6 7
Michael D. Kroll, RLA, FASLA
President
1. Cover Page
Page 82. Table of Contents
Page 9Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
2. Table of Contents
Tab Page
1 Cover Page 5-7
2 Table of Contents 9
3 Minimum Qualification Requirements 11-24
4 Evaluation Criteria 26-94
Firm Qualifications and Experience 26
Qualification of Key Personnel Assigned to Engagement 39
Project Approach 85
Florida Statute 287.055 Certified Minority Business Enterprise
Certification 93
Past Performance - References 94
5 Contract Forms 96
6 Exceptions 108
CONTINUING SERVICES FOR
LANDSCAPE ARCHITECTURAL SERVICES CCNA
RFQ No. 22-06-01
Miller Legg Proposal 22-P0228
Relevant to you:
Miller Legg
delivered the
award winning
Pelican
Community Park.
Page 103. Minimum qualifications
requirements
Page 11Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
3. Minimum Qualifications Requirements a. State of Florida Registered Landscape Architect
Miller Legg meets the minimum qualifications
requirements for a proposer to be deemed
responsive by the City.
a.
Miller Legg was established in 1965 and has been offering
landscape architecture, civil engineering, surveying and
environmental services to both public and private clients.
Miller Legg is active with the Florida Department of
State, Division of Corporation. Our document number is
P95000021117.
Page 12Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
3. Minimum Qualification Requirements - Licenses
Page 13Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
3. Minimum Qualification Requirements - Licenses
Page 14Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
3. Minimum Qualification Requirements - Insurance
Page 15Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
3. Minimum Qualification Requirements b. Government Contracts
b.
Miller Legg has been awarded numerous projects, as a prime and subconsultant, within the past five years as illustrated
below:
• City of West Palm Beach Gregory Road Green
Streets LID Sanitary Sewer & Stormwater
• Town of Lauderdale-By-the-Sea Poinciana/
Bougainvillea Roadway and Parking
Improvements
• City of Miami Hadley Park Synthetic Turf and Park
Improvements
• City of Miami Morningside Tennis Center
• City of Palm Beach Gardens Tennis Center
• City of Miami Beach 20 Street & Sunset Drive
Pocket Park
• City of Homestead Biscayne-Everglades Greenway
Trail
• City of Tamarac Go-Forward Roadway Landscape
Master Plan Update
• City of Miami Gardens Rolling Oaks Regional Park
• City of Coral Springs Tree and Landscape
Inspections
• City of Miami Beach Chase Avenue and 34 Street
Shared Path
• Orlando VA Healthcare System Medical Center
Facility Master Plan
• Town of Davie Governor Leroy Collins Farm Park
• City of Fort Lauderdale Las Olas Streetscape
Design
• City of Miami E.G. Sewell Park
• City of Dania Beach Southeast Drainage
Improvements Phase 2
• City of Tamarac University Drive Landscaping
Improvements
• Broward County Sheriff’s Office New Training
Center Garage Design/Build
• Miami-Dade County Parks, Recreation & Open
Space Greynolds Park Playground Design
• City of Delray Beach Pompey Park Community
Center and Campus Design
• City of Miami La Pastorita Neighborhood Roadway
Improvements Study
• City of Boca Raton Police Services Department
• City of Weston Community Center
• Veterans Administration Florida National
Cemetery Phase 5 Design Build
• City of Port St. Lucie Landscape Architect-Arborist
for GPS Landscaping & Signs Inventory
• City of Oakland Park East Dog Park
• City of Miami Fairlawn Community Park
• Miami Beach Ballet and Workforce Housing
• Town of Davie New Town Hall Engineering Design
Criteria Package
• City of Tamarac Commercial Boulevard
Landscaping Improvements
• United States Department of Veterans Affairs
South Florida National Cemetery Phase 2 Design-
Build
• Broward County South New Regional Courthouse
Pre-Design Phase
• City of Hallandale Beach Atlantic Shores Boulevard
from US-1 / Federal Highway to Diplomat Parkway
• Palm Beach County Homeless Resource Center 2
• City of Miami Armbrister Park Community Center
• City of South Miami Sunset Drive Roadway and
Beautification Improvements
• Miami-Dade County Water and Sewer Department
E15-WASD-02 Pump Station 0051
• Lake County CR 437 Realignment and Roundabout
• FDOT District 1
à 1 SR 789/Ringling Minor Bridges PD&E
from Bird Key Drive to Sarasota Harbor
West #CA662 SR 31 at CR 74 Roundabout in
Charlotte County #CA734
à SR 572/Drane Field Road Roundabout at
Waring Road #CA900
à Fowler Street at SR 884/Colonial Boulevard
Intersection Improvements #CA668
• FDOT District 3
à SR 79 at SR 8/I-10 Landscape Holmes County
à SR 30A/US 98/Panama City Beach Parkway
Multilaning from Mandy Lane to East of
Nautilus in Bay County
à SR 281 Berm Landscaping Drainage Pond in
Santa Rosa County
• FDOT District 4
à EB SR 84 to SB SR 93/I-75 On-Ramp
Interchange #C9W57
à Sidewalk Design for SW 148 Avenue (Miramar)
& Lakeside Neighborhood Sidewalks and
Roundabout (Oakland Park) #CA576
à SR 802/Lake Worth Road Roundabout
Pedestrian Improvements
à BDI D/W Plans Review /Support Services
#CA278 FDOT District 4 SR 9/I-95 from S of 45
Street to N of 45 Street Diverging Diamond
Interchange (DDI) #CAA01
à Port St. Lucie Boulevard from Becker Road to
Paar Drive #CA885
à D/B I-95 3C Express Lanes from Stirling Road
to Broward Boulevard including I-595 from SR
441 to I-95
Page 16Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
3. Minimum Qualification Requirements b. Government Contracts
à SR 804/Boynton Beach Boulevard Various
Locations CAC93
à SR-9/I-95 at Lantana Road Diverging Diamond
Interchange (DDI)
à SR 5/US 1 from N of SR 70/Virginia Avenue to N
of Avenue O Resurfacing
à SR A1A from Broward County Line to SE 3
Street in Boca Raton
à SR A1A from Lake Avenue to Ibis Way and SR
816/Oakland Park Boulevard from Rock Island
Road to East of NW 31 Street Resurfacing
à SR 5/US 1 from NE 17 Way to NE 33 Court
• FDOT District 5
à SR 46 from US 17/92 (MP0.010) to Mellonville
Avenue (MP 1.022) in Seminole County
à SR 25/SR 500 from North of Griffin Road to
South of Martin Luther King Jr. Boulevard in
Lake County #CA654
à SR 527 from Clay Avenue to S Orlando Avenue
and Roundabout CAD41
à I-4 at SR 429/Western Beltway Auxiliary Lanes,
Ramp Improvements and Resurfacing #CA415
à SR 25/SR 200/US 301/US 441 from CR 25A to US
301/US 441 Interchange Resurfacing
• FDOT District 6
à SR 5 / US 1 / S Dixie Hwy from N of SW 80
Street to S of Riviera Drive #CA945
à SR 847/NW 47 Avenue Post Design
à SR 5/US 1 from SW 336 Street to SW 304
Street
à SR 826/Palmetto FEC Crossing @ 154 Street
(Hialeah) Post Design
à D&E SR 994/SW 200 Street/Quail Roost Drive
à Florida Keys Post Hurricane Irma Landscape &
Tree Assessments
à SR 5/US 1 at SW 137 Avenue Contract #CAG29
à SR 9336/SW 344 St/Palm Drive from SW 192
Avenue to W of SR 5/US 1
à SR A1A/Collins Avenue from N of 26 Street to
44 Street/Indian Creek Drive #CAA06
à Pedestrian Bridge over SR 90/SW 8 Street and
C-4 Canal at SW 109 Avenue Contract #CAC84
à I-75 from NW 178 Street to NW 202 Street
Landscape
• FDOT District 7
à E7R10 D/B Howard Frankland Northbound
Bridge Replacement (I-275)
• Florida Turnpike Enterprise
à SR 417/Seminole Expressway Resurfacing from
Orange/Seminole County Line to South of
Lake Jesup Bridge MP 38-44.5
à SR 91/Mainline at Sample Road NB Off-Ramp
Improvements #C9U40-4
à Snapper Creek Service Plaza General
Improvements MP 19 #CAA40
à SR 54 Operational Ramp Improvements (SR
589) Interchange (MP 0.19) #CAA03
à SR 91/Mainline MP 265.3 - MP 269.4 Orange
County Resurfacing and Safety Upgrades
#CA527
à D/B Polk Parkway Widen & Resurface MP
18.028 to 22.286 in Polk Cty #E8R82
à SR 417/Seminole Expressway Resurfacing from
S of Lake Jesup Bridge to N of CR 427/Lake
Mary Boulevard Interchange MP 44.5-49.9
#CA708
• School District of Palm Beach County Pine Grove
Elementary School Modernization
• Florida International University
à Felsberg Veterans Memorial Plaza
à Josh Richardson Memorial Plaza
à Alexa Duran Memorial
à Parkview Housing Promenade and Plaza
à Parking Garage 3 West Side Exit
à Biscayne Bay Campus Lift Station
à 107 Avenue Parking Signage
à Parking Garage 2 South Side Exit
à Green Library North Wellness Walkway
à Parkview Housing Phase 2
• Miami Dade College
à InterAmerican Campus 7 Street Closure Traffic
Study
à Kendall Makers Lab
à North Campus Roadway Assessment
• Broward College South Campus B-99 Aviation
Hangar Addition Design Criteria
• Nicklaus Children’s Hospital CCBT Plaza
• Jackson South Medical Center Garage & Site
Improvements Design Criteria Package
• Joe DiMaggio Children’s Hospital Expansion
Page 17Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
3. Minimum Qualification Requirements b. Government Contracts
City of Miami Beach 20th Street & Sunset Drive Pocket Park
Miami Beach, FL
Miami Beach needed a small park for the community to use while
a nearby park was being redesigned. Ultimately it would serve
the adjacent community and provide a public art component.
Some challenges that arose:
• The City never provided playground equipment.
• The City added an artist and coordination with the artist to
our task.
• The concepts were accepted and then requested for
additional revisions beyond the scope.
• Water table was an issue because the City never provided
the contractor with the geotechnical report.
• Footers for support post were poured in the wrong
locations.
• Initially the design was to provide sheet flow to existing
drainage structures. Per City review we had to retain water
on site for 100 year flood capacity.
To meet the goals of the project, we provided the play
components of the park as the art pieces. We had to redesign
the park to fit within the confines of the erroneously poured
support pole footers. The addition of berms to retain water on
site were created and the play area raised above anticipated
water retention levels.
Some creative thinking of having the playground/play equipment
be the art pieces was quite inventive. Adjusting the design for
the misplaced footer design, and redesigning the site to hold
100 year flood water levels, were logical solutions.
The final product was a great park that the City was proud of.
They saw our creativity and ability to adapt to a changing scope.
They got the best of our work at a minimal cost. The City recently
provided us with a new project, showing that they trust in our
ability to adapt and deliver a quality product in a timely manner.
In the end we were able to recoup a small portion of time we put
into the project but some cost savings were provided through
the “art pieces” play equipment, instead of using traditional
play equipment.
Start / Finish Date: 04/18 - 02/20
Page 18Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
3. Minimum Qualification Requirements b. Government Contracts
Miami-Dade County Parks, Recreation & Open Space (PROS)
Equitable Distribution Program Continuous Professional
Services Agreement
Miami-Dade County, FL
The following park projects have been performed under Miller
Legg’s Continuing Services Contract with PROS:
Debbie Curtin Interactive Park
Responsible for development of the conceptual rendering
plans and construction document for this exciting interactive
park. Features of the interactive components include a drums
metallophones, chimes, bongo, hourglass and ring-a-bell
panels, as well as a custom rope climber, and a global motion
freestanding play structure.
Sabal Chase Park Playground
Provided design, construction plans, permitting and construction
administration for a new small tot lot playground at Sabal Chase
Park in Miami. Included is the installation of new trees, sod, and
butterfly-inspired plant material as well as the restoration of all
areas, including walkways and lawns.
South Dade Park
Provided survey/SUE, design, construction plans, permitting and
construction administration for a new small tot lot playground.
Included is the installation of new trees, sod, and butterfly-
inspired plant material as well as the restoration of all areas,
including walkways and lawns.
Devon-Aire Park
Provided survey/SUE, design, construction plans, permitting and
construction administration for a new shelter and connecting
walkways. Also included is the relocation of trees and the
restoration of all areas, including walkways and lawns.
Greynolds Park Playground Design
Retained to provide topographic and tree surveys, SUE services,
civil engineering, and landscape architecture services. Program
includes ADA compliant sidewalk, demolition of existing
playground and construction of a new playground that meets
nature play criteria set forth by PROS. Educational and historic
signage will be designed and added to the playground area.
Start / Finish Date: 08/16 - Ongoing
Page 19Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
3. Minimum Qualification Requirements b. Government Contracts
City of Tamarac Go-Forward Roadway Landscape Master
Plan Update
Tamarac, FL
City of Tamarac Commercial Boulevard Landscaping
Improvements
Tamarac, FL
Miller Legg provided the City of Tamarac with an update to its
citywide Roadway Landscape Master Plan. The project consisted
of creating a go-forward landscape roadmap guide that will
be implemented for years to come. Miller Legg conducted a
citywide tree inventory assessment, an evaluation of existing
landscape, irrigation and hardscape conditions, an overall
assessment of the existing character of the road corridors, and
an opportunities and constraints analysis. The overall goal was
to create a Landscape Master Plan that provides the City with
typical conceptual landscape concepts, recommendations,
guidelines, and implementation strategies to follow. The Master
Plan was unanimously adopted by the City Commission.
Start / Finish Date: 02/19 - 05/20
The City of Tamarac engaged Miller Legg to provide landscape
architectural and survey services for the existing medians
along 1.70 miles of West Commercial Blvd in Broward County
between North Pine Island Road and Sawgrass Expressway. In
addition to landscape architecture, a certified arborist report
and survey (including vacuum excavations) services, the Miller
Legg team provided lighting and electrical services, irrigation
design, permitting, and construction administrative services.
Coordination efforts with multiple agencies, such as the
Florida Turnpike Authority (FTE) and the South Florida Water
Management District (SFWMD), is included in the project scope.
Specific services for these roadway improvements entailed
providing a specific purpose survey showing only above-ground
improvements, compiling a 30% conceptual landscape and
lighting plan, and providing 100% construction documents for
irrigation, landscape, hardscape, lighting and electrical, and an
arborist assessment.
Start / Finish Date: 12/20 - 06/22 (est)
Page 20Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
3. Minimum Qualification Requirements b. Government Contracts
City of Oakland Park East Dog Park
Oakland Park, FL
City of Oakland Park NW 21st Avenue Streetscape
Oakland Park, FL
To assist with the City of Oakland Park’s plan to develop a 1-acre
Dog Park at the existing Richard Giusti Heart Par Cours Park,
Miller Legg was retained for topographic and tree surveying,
SUE, engineering and landscape architecture services as well
as an opinion of probable cost. The firm is providing schematic
designs to include layout, existing/proposed trees and shrubs,
fencing, benches, site amenities, water station, parking layout
and pathway location.
Start / Finish Date: 03/20 - Ongoing
Under the firm’s Continuing Services Contract, Miller Legg
prepared an aerial conceptual plan and typical sections for
streetscape improvements within the right-of-way along NW
21st Avenue between Oakland Park Boulevard and NW 26th
Street. The conceptual design included a conversion of a
continuous median into multiple landscaped medians. The
proposed medians work towards the continued beautification
of the corridor. The project also focuses on connectivity and
safety for pedestrians and bicyclists. It extends the existing
bike lane and adds visible pavement markings that promote
safety on the street, at driveways, and at intersection crossings.
Start / Finish Date: 05/19 - 07/19
City of Oakland Park Lakeside Sidewalks
Oakland Park, FL
The City of Oakland Park was evaluating the addition of
sidewalks within the Lakeside community to improve pedestrian
connectivity as part of its Complete Streets program. As part of
the documentation required for CSLIP grant applications, Miller
Legg provided a conceptual aerial overlay plan and a typical
cross-section illustrating the proposed 5 ft. sidewalks along the
right-of-way for specific road segments within Lakeside.
Start / Finish Date: 08/17 - Ongoing
Page 21Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
3. Minimum Qualification Requirements b. Government Contracts
City of Oakland Park Safe Routes to Schools
Oakland Park, FL
City of Oakland Park Parks & Recreation Master Plan
Update Oakland Park, FL
City of Oakland Park Parks & Recreation Master Plan
Oakland Park, FL
Miller Legg was retained to assist the City of Oakland Park in
preparing documents required for the Safe Routes to School
(SRTS) grant program for the Lloyd Estates Elementary School
Sidewalk Improvements project. The Safe Routes to School
grant funding is administered by FDOT. Miller Legg conducted
public outreach with the local community as part of preparing
its walkability assessment. The firm’s report to the City
included a concept plan, typical cross-section and walkability
memorandum.
Start / Finish Date: 11/18 - 01/19
Having prepared the original Recreation and Parks Master Plan
for the City of Oakland Park in 2009, Miller Legg was retained by
the City in 2015 to update this Plan. The scope of services involved
site analyses of each park and community center, a recreational
programming needs assessment based upon the current and
anticipated City population, a proposed implementation plan
with recommendations for recreational improvements including
cost estimates and the application of updated census data to
a map and exhibits format for comparison with the original
Master Plan.
Start / Finish Date: 8/17 - 11/18
Miller Legg was retained to assist the City of Oakland Park in
preparing documents required for the Safe Routes to School
(SRTS) grant program for the Lloyd Estates Elementary School
Sidewalk Improvements project. The Safe Routes to School
grant funding is administered by FDOT. Miller Legg conducted
public outreach with the local community as part of preparing
its walkability assessment. The firm’s report to the City
included a concept plan, typical cross-section and walkability
memorandum.
Start / Finish Date: 03/08 - 12/09
Page 22Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
3. Minimum Qualification Requirements b. Government Contracts
City of Miami Morningside Tennis Center
Miami, FL
The City of Miami Morningside Park created an expanded
and improved tennis facility at this 42-acre Park. The project
included improvements to an existing seven (7) courts that had
experienced degradation due to drainage and soil stabilization
issues. A new court layout was developed to increase the facility
to eight (8) lighted courts and a warm-up training wall amenity.
Other tennis improvements included upgraded lighting, fencing
and shaded bench area. A central courtyard was also developed
as a key element of the project design. This courtyard creates
an inviting area for players and spectators to gather before and
after matches. A themed paver field with lush landscaping that
embraces large existing ficus trees creates a pleasant gathering
space not previously found at Morningside Park, and helps
establish it as a premier public tennis destination in the City of
Miami.
Miller Legg services included civil engineering, landscape
architecture, arborist, permitting and limited construction
administration to assist the City in the bidding, observation and
certification of the project improvements. Arborist services
included evaluating existing trees for health, longevity and
relocation prospects. Once relocated, the trees were monitored
for ongoing wellbeing on site. Apart from the City, other
agencies with jurisdiction for this project include Miami-Dade
County Department of Environmental Resources (DERM) and
South Florida Water Management District (SFWMD). Received
the Facility Showcase award by the Florida Recreation & Park
Association. Miller Legg secured this project under the firm’s
Continuing Services Agreement with the City of Miami.
Start / Finish Date: 07/15 - 12/18
Page 23Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
3. Minimum Qualification Requirements b. Government Contracts
City of Lauderhill Sports Park
Lauderhill, FL
Town of Lauderdale-By-the-Sea Poinciana/Bougainvillea
Roadway and Parking Improvements
Town of Lauderdale-By-the-Sea, FL
Miller Legg was retained by the City of Lauderhill to provide
landscape architecture, irrigation design, civil engineering design,
stormwater permitting, construction specifications and bidding
assistance services for proposed amenities improvements at
the 12-acre Lauderhill Sports Park. Replacement of the baseball
field and cricket pitch natural grass with synthetic turf and the
football scoreboard replacement tasks have been finalized.
Miller Legg has also completed design of the playground area
wood chip surface conversion to synthetic turf, playground
shade, modifications to portions of the fitness trail and the
addition of new fitness stations trail and exercise equipment.
Start / Finish Date: 03/17 - 01/19
Under the firm’s Continuing Services Contract, Miller Legg
provided design and permitting services for parking, roadway
and landscape architectural improvements for the Poinciana
Street and Bougainvillea Drive area north of Commercial
Boulevard to alleviate congestion along the parallel corridor of
SR A1A in the Town of Lauderdale-By-The-Sea. Services included:
roadway and parking area design, signing and pavement
marking, lighting, utility coordination, permitting, landscape,
hardscape and irrigation, and pre- and post-construction
observation services.
Start / Finish Date: 06/17 - 01/19
Relevant to You:
Community Outreach / Interactive Webpage:
Miller Legg can coordinate with the City to organize a page within the
City’s existing website to assist in data gathering and dissemination
of project information. Other social media outlets (Facebook,
Instagram, Twitter, etc.) are also effective tools utilized for keeping
the public involved in and informed about the process.
Page 24Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
3. Minimum Qualification Requirements c. References
City of Tamarac | Roadway Landscape Master Plan
Robert Johnson
City Planner
7525 NW 88th Avenue
Tamarac, FL 33321
Robert.Johnson@tamarac.org
954.597.3533
City of Oakland Park | East Dog Park
Sierra Marrero
Assistant Director of Engineering and Building Services
5399 N. Dixie Highway, Suite 3
Oakland Park, FL 33334
sierra.marrero@oaklandparkfl.gov
954.630.4479
Miami-Dade County Parks, Recreation & Open Space
(PROS) | Equitable Distribution Program Continuous
Professional Services Agreement
Hong Yun, RLA, LEED AP
Landscape Architect
275 NW 2nd Avenue, 4th Floor
Miami, FL 33128
hongbum.yun@miamidade.gov
305.755.7922
Additional references for your consideration:
Page 254. Evaluation Criteria
Page 26Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
4.1 Firm Qualifications and Experience
The overarching ‘Improving Communities. Creating
Environments.’ tagline Miller Legg adopted many years
ago informs the way we approach every project and is
at the heart of all our corporate efforts. Our 57+-year-
old firm has offices in Miami, Fort Lauderdale and Port
St. Lucie. Client sectors include municipal and county
government, transportation, healthcare, education,
federal and international. This offers our clients a firm of
seasoned professionals across multiple disciplines who
are leaders in the Florida consulting industry. Our core
landscape architecture and land planning services are
outlined below, some of which have been used in Sunny
Isles Beach projects.
Landscape architecture services include planting,
hardscape, irrigation, urban design, complete street
design, recreational and commercial planning, project
theming, signage design, graphic design, contract
administration, construction observation services, plan
review, horticultural consulting and arboriculture. In
addition, the firm has inventoried more than 40,000 trees
ranging from 28 to 20,000 trees per project. Our award-
winning consulting firm has lived our tagline “Creating
Environments, Improving Communities” in the delivery
of landscape architecture, urban design and planning
services for over 52 years. Through a collaborative,
holistic approach, we develop memorable spaces that
balance the needs of our communities with the respect
and sustainability of our natural systems. Globally,
our projects include parks and recreation facilities,
streetscapes, community design greenways, mixed-use
redevelopments, educational and healthcare facilities,
urban revitalization, environmental habitat restoration,
resorts and transportation facilities. With over 45 diverse
design awards, our projects and the design process
utilized to develop each sustainable solution have been
recognized by our peers for their success.
Planning services include: land planning, comprehensive
planning, community planning, development plans
review, CRA and redevelopment planning, landscape
architecture, urban design, complete street visioning,
parks and recreation planning and design, site planning
design and processing, corridor and Development
of Regional Impact (DRI) studies, Land Use Plan
amendments, rezoning applications, concurrency
studies, due diligence studies, community relations, grant
writing assistance and applications, and plat preparation
and processing.
Miller Legg is a true multi-discipline consultant, offering
the following additional services which are often required
for the types of projects suggested in the RFQ scope of
services:
Civil engineering services include: utilities design
and modeling (such as water and sanitary sewer
design and permitting, pump station design, surface
water management, drainage system design), utility
coordination, traffic engineering, complete streets
and highways design, street lighting design, pavement
marking and signage design, parks and recreation design,
master planning, municipal engineering, construction
monitoring and full Construction Engineering Inspection
(CEI) and management services.
Surveying services include land surveying such as
boundary, land title, route, right-of-way, platting, design
and control, topographic, Subsurface Utility Engineering
(SUE), as-built, tree, and hydrographic surveys,
construction layout, Construction Engineering Inspection
(CEI) surveys, field monumentation, sketches and
descriptions for acquisitions and easements, and GPS data
collection. In addition, we provide quantity (earthwork)
surveys, condominium surveys, title document analysis,
plot plans, and expert witness testimony. Miller Legg
has completed surveys for numerous municipal, county,
state and federal projects ranging from neighborhood
improvement and redevelopment projects, educational
facilities, neighborhood parks, and golf course designs to
regional water and sewer utilities, streetscapes, streets
and highways, and cemeteries.
Environmental consulting services include habitat
assessment and restoration planning, wetlands
investigations and delineations, management plans,
grant writing, jurisdictional determinations, threatened
and endangered species assessments and permitting,
environmental due diligence, National Pollution
Page 27Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
4.1 Firm Qualifications and Experience
Discharge Elimination System (NPDES) compliance,
stream restoration and water quality monitoring
and compliance. The firm also provides wildlife
surveys, seagrass and coral reef surveys, mitigation
feasibility studies, mitigation design, planning and
construction observation, mitigation banking, value
ecological engineering, cost evaluation and scheduling,
environmental permit processing, mitigation monitoring
and compliance, protected upland and tree permitting,
ecosystem analysis, grant writing and floodplain analysis
and re-evaluation.
The firm has completed numerous municipal, county,
state and federal projects ranging from neighborhood
improvement and redevelopment projects, educational
facilities site planning, cemeteries, neighborhood parks
and golf course designs to aviation facilities, complete
streets projects, regional water and sewer utilities,
streetscapes, and streets and highways.
Additionally, the firm has successfully completed several
thousand private sector projects including residential
developments from two to 7,000 acres, industrial and
office sites, hotels and theme park facilities, marinas,
golf courses, hospitals and medical office complexes,
commercial properties, retail shopping centers and
franchise properties. The firm has been involved with
more than 200,000 acres of project design development
in Florida.
Our approach to each project is best characterized by
a “partnering relationship”. We dedicate ourselves to
learning the culture of our clients, and their specific
concerns, desires and needs, much like an extension
of their own offices. We consistently strive to maintain
time schedules and to provide factual and frequent
communication. Miller Legg prides itself on its Team
approach to the interdisciplinary needs unique to the
project and client. We provide responsive, personalized,
quality service to value-conscious private clients and
select government agencies, who desire the very best in
planning and design.
Stability
Financial stability is achieved by applying successful
strategies over time and being adaptable to changing
markets and economies. Miller Legg has been in operation
for 57+ years. The firm is geographically diverse and has
strength and expertise in numerous market sectors,
including municipal markets. We have established a
stable workforce of highly-regarded and well-qualified,
licensed professionals, technical and support staff on
whom we can depend to provide Miller Legg’s project
deliverables to our clients. Together, these factors have
established and continue to safeguard the company’s
financial stability and success, ensuring our capability to
provide the resources required of this City of Sunny Isles
Beach contract.
Representative awards for projects which included
Landscape Architecture Services
GENERAL AWARDS & RECOGNITIONS:
• Sun-Sentinel, Top Workplaces, 2016-2021
• ENR Southeast Regional Top Firms List, 2021
• Landscape Architect & Specifier News, Florida
Firms and Projects Features, 2019, 2020, 2021
• Southeast Construction Magazine, Southeast’s
Top Designers List, 2005-2010
• Zweig White Hot Firms List, Top 200 Fastest
Growing A/E and Environmental Consulting Firms,
2007
PROJECT SPECIFIC AWARDS:
Plantation Preserve & Golf Club
• Florida Chapter of the American Society of
Landscape Architects, Outstanding Design
Award, 2012
• Florida Nursery, Growers and Landscape
Association, Award of Excellence, 2009
AWARD WINNING PROJECTS
Page 28Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
4.1 Firm Qualifications and Experience
Sunny Isles Beach Pelican Community Park
• American Society of Landscape Architects, Florida
Chapter, Award of Merit, 2009
FDOT District 6 Biscayne Boulevard (NE 5th Street to NE
13th Street)
• Florida Section of the American Society of
Landscape Architects, Outstanding Project Honor
Award, 2011
City of Coconut Creek Sample Road Streetscape
• Broward County Broward Beautiful, Third Place for
Roadway / Swale Beautification, 2004
Florida International University (FIU) US Century Bank
Arena Plaza
• American Institute of Architects, State of Florida
AIA Merit Design Award, 2012
We have consistently proven to our clients, including
the City of Sunny Isles Beach, our aptitude for delivering
assignments on time (often expedited) and within budget
by dedicating appropriate resources, technology and
equipment. 85% of our client base is repeat clients and
this retention rate is evidence of the trust placed in us to
work smart and to plan in order to successfully manage
each assignment. The client references in this submittal
bear out this level of commitment and the following
sample comments from current and past clients in the
past 5 years illustrate the trust they place in Miller Legg
to successfully deliver on their projects.
“I found their staff to be proficient, responsive,
knowledgeable and supportive of our combined efforts.
Miller Legg’s guidance and persistence made for a truly
collaborative endeavor.”
City of Plantation First Parks & Recreation
Master Plan
Patricia O’Toole
Parks and Recreation Assistant Director
“Mr. Kroll and his team were always just a phone call
away, ready to serve and resolve any design challenges
thrown their way.”
City of Coral Gables War Memorial Youth Center
Athletic Fields
Javier Torres
Principal, MC Harry Architects (Prime)
CLIENT RECOGNITION FOR SIMILAR
PROJECTS
Page 29Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
4.1 Firm Qualifications and Experience
“Miller Legg’s past experience with this complex process
was the reason we selected the firm for the project and
their diligence, expertise and patience throughout was
extremely helpful.”
City of South Miami First Parks & Recreation
Master Plan
Quentin Pough, CPRP
Director of Parks and Recreation
“Miller Legg staff has always demonstrated quality
technical and management skills and they ensure they
fully understand our projects in order to meet our
requirements and needs”
School Board of Broward County Office of
Facilities and Construction
Divine Amoah
Architectural Engineering Manager
“Their staff expertise and professionalism have been
remarkable and I am extremely satisfied with the result”
City of Miami Baywalk Phase 3
Capital Improvements Program
John DePazos
Sr. Project Manager
“The staff demonstrate a wealth of technical expertise
and develop practical solutions to project challenges”
City of Pembroke Pines Foxcroft Wetland
Mitigation Area
George Wrves
Project Manager
“Miller Legg is thoroughly professional, responsive,
communicative and technically skilled”
City of Doral Glades Park
Barbara Hernandez
(former) Parks and Recreation Director
“They have approached their work with sensitivity
and enthusiasm, presenting solutions to scope and
permitting challenges while adhering to the project
budget and timetable”
City of Homestead Biscayne Everglades
Greenway
Pedro Reynaldos
Director of Parks & Recreation
”I have found the staff to be very competent, proactive
and timely with task completion. They manage
assignments extremely diligently and have been very
helpful in accommodating some last-minute inspection
requests.”
City of Coral Springs Continuing Landscape
Architecture and Landscape Inspection Services
Claudia Alzate
Coral Springs Arbor & Horticulture Manager
Public Works Department
“Their professional staff were well-versed with Broward
County’s rules and regulations for surface water
management.”
City of Lauderhill Lauderhill Sports Park
J. Martin Cala
DEES Director/City Engineer
“The project went very smoothly and the client was very
happy with the final product”
City of Miramar Forzano Park Improvements
Juan Vasquez
Vice President
RJ Behar (Prime)
“The staff at Miller Legg have been amazing to work
with. The team is very professional and timely with all
requests.”
City of Tamarac East Side Parks Feasibility Study
Linda Probert
Parks & Recreation Assistant Director
“We highly recommend Miller Legg.”
Boca Raton Beach and Parks District Red Reef Park
Master Plan Update
Arthur Koski
Executive Director
“Miller Legg provided excellent landscape design services
at short notice, coordinating very well with the City of
Fort Lauderdale. They have been very responsive during
design and post-design services of this Neighborhood
Enhancement project”.
FDOT District 4 Fort Lauderdale Sistrunk Pedestrian
Enhancements
Amin Ahmed
Project Manager
Stanley Consultants (Prime)
“This was a high priority project that had to be
completed in time for a major event. Miller Legg provided
outstanding service throughout all phases to assist us in
meeting our deadline with a quality product.”
Broward College Bailey Hall Landscape Improvements
William Gallo, AIA
Vice President
Gallo Herbert
Page 30Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
4.1 Firm Qualifications and Experience
In addition…….
Miller Legg currently holds over 40 public sector
continuing services contracts, a testament to the
satisfaction of the clients in our ability to ensure our
project deliverables are completed efficiently and
responsibly and to the satisfaction of the owners.
Having reviewed the list of possible scope elements for
potential projects under this City of Sunny Isles Beach
Continuing Services Contract, Miller Legg is privileged
to be able to offer a project portfolio showcasing these
very scope items. Examples of our projects can be seen
throughout our submittal, in resumes, project sheets and
reference project sheets. A broad sampling of service
components and projects is offered below:
Tree Surveying: Our arborists have provided tree
surveying for the following projects located in Miami-
Dade County: City of Coral Gables Sunrise Harbor
Surveying, City of Doral Central Park, City of Miami
Armbrister Park Community Center, Florida International
University Parkview Housing Phase 2, Florida
International University Trish & Dan Bell Chapel and East
Loop Road Realignment, Miami Art Museum, Miami
Science Museum, Miami-Dade County PROS Greynolds
Park Playground Design, SFWMD Allapattah Flats/
Comprehensive Everglades Restoration Project (CERP).
RER Tree Removal Permitting: Our arborist and landscape
architecture staff have coordinated this permitting
for the following example projects located in Miami-
Dade County such as City of South Miami Sunset Drive
Beautification, Nicklaus Children’s Hospital Tomotherapy
Building Site Design, Miami Dade College Kendall
Classroom and Student Services Building, City of Miami
Buena Vista Heights Landscaping,
Irrigation Design, Operation and Maintenance: Our
irrigation designers have provided these services for the
following projects in Miami-Dade County among others:
FIU Engineering Building BT 919, FIU Green Library
Walkway, FDOT 6 Design/Build I-395 Bridge/SR 836 &
I-95, Miami Beach 19th Street Stormwater Pump Station
and Botanical Gardens, Coral Gables War Memorial Youth
Center Fields, Miami Dade County Aviation Department
Opa-locka Executive Airport Beautification, Victoria Park
Design.
Median and/or Swale Landscaping Design: Examples of
this type of work performed by our professional staff
include the following -FDOT District 6 SR 9336/SW 344
St/Palm Dr from SW 192 Avenue to W of SR 5/US 1, City of
Hallandale Beach Atlantic Shores Blvd., City of Tamarac
Commercial Boulevard Landscaping, Coral Springs Tree
and Landscaping Inspections, City of Oakland Park 21st
Avenue Streetscape, City of Plantation Preserve and
Golf Club, Miami-Dade Aviation Department Central Blvd
Landscape Master Plan, City of Coconut Creek Sample
Road Streetscape.
Landscape Maintenance Service Inspections: Miller
Legg has handled a myriad of projects which have
included this service in the scope, such as FDOT District
6 SR 25 / Okeechobee Road and HEFT, FDOT District 6
SR 826 @SW8th Street LA Inspections, FDOT D6 Three
BOLD Corridors in Miami, Florida Atlantic University
Habitat Management, City of Coral Springs Landscape
Inspections.
Active and Passive Park Design: Our firm has been very
fortunate to be selected to design a significant number of
both active and passive parks in Florida and are currently
engaged in park design and construction in Miami-
Dade County, Broward Count and Palm Beach County.
Examples of these projects are interspersed throughout
our submittal.
b. SIMILAR PROJECT SCOPE EXPERIECE
Page 31Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
4.1 Firm Qualifications and Experience
Feasibility Analysis: The firm have conducted various
landscape and irrigation feasibility analyses as a typical
part of municipal landscape architecture continuing
services contracts and for FDOT (such as FDOT1 SR 31 at
CR 74 Roundabout Intersection, FDOT Florida Turnpike
SR 54 Exit Ramp at SR 589 Interchange).
Attendance at meetings with City Staff and presentations
to City Commission: The requirement to attend
meetings with City Staff is a characteristic piece of the
scope for most of our landscape architecture project
contracts and one with which we have an abundance of
experience. These can include meetings with other City
departments, agencies or public meetings. We also are
practiced in preparing and delivering presentations to
City departments and Commission meetings for different
types of projects.
City of Sunny Isles Beach Pelican Community Park -
A three-acre active park site, for which Miller Legg
managed landscape architecture, irrigation, engineering,
surveying and architecture designs for a baseball field,
recreation building, playground structure, gymnasium,
and related site amenities within the City of Sunny Isles
Beach. The project management team at Miller Legg
received recognition from the City for their involvement
in the design completion of the park. In addition, Miller
Legg provided construction observation services. In
addition, we also provided grant assistance to secure a
Florida Recreational Development Assistant Program
(FRDAP) grant for $200,000. FRDAP is a competitive
grant program that provides financial assistance to
local governments for development or acquisition of
land for public outdoor recreational purposes. Award of
Merit, American Society of Landscape Architects, Florida
Chapter, 2009
City of Miami Beach 20th Street & Sunset Drive Pocket
Park - Under our Continuing Services Contract with
the City of Miami Beach, Miller Legg was awarded
an assignment to provide survey, civil, geotechnical,
electrical, structural engineering and landscape
architecture services for the design, permitting and
construction of a new ADA-accessible .33-acre pocket
park at 20th Street and Sunset Drive. The firm prepared
a boundary and topographic survey, assisted with the
planning of key program elements and performed
schematic design, design development, construction
document, bidding and construction tasks. The design
incorporates Crime Prevention Through Environmental
Design principles. Arborist and irrigation design services
were also furnished for this project.
City of Coral Gables War Memorial Youth Center -This
City of Coral Gables 7-acre War Memorial Youth Center
in Miami Dade County represents a living memorial to
Coral Gables World War II veterans. The project includes
improvements to the multi-purpose athletic fields. Miller
Legg was responsible for the landscape architecture, civil
engineering design and permitting of the improvement
program. Specific improvements included athletic field
drainage, re-sodding with Bermuda “Celebration” turf
and irrigation design. The irrigation system ties into
a non-potable well system. Drainage improvements
consist of subsurface field improvements that integrate
with the existing exfiltration and subsurface drainage
systems. Additional services provided include: design
development, final construction documents, and
construction administration.
City of Tamarac Roadway Landscape Master Plan
Update: Miller Legg provided the City of Tamarac with
an update to its citywide Roadway Landscape Master
Page 32Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
4.1 Firm Qualifications and Experience
Plan. The project consisted of creating a go-forward
landscape roadmap guide that will be implemented
for years to come. Miller Legg conducted a citywide
tree inventory assessment, an evaluation of existing
landscape, irrigation and hardscape conditions, an
overall assessment of the existing character of the road
corridors, and an opportunities and constraints analysis.
The overall goal was to create a Landscape Master
Plan that provides the City with typical conceptual
landscape concepts, recommendations, guidelines, and
implementation strategies to follow. The Master Plan
was unanimously adopted by the City Commission.
Miami-Dade County Parks, Recreation and Open Spaces
(PROS) Projects – In the past 5 years alone, Miller Legg
has performed LA and arborist services for a number of
PROS parks projects, such as Greynolds Park Playground
Design, Devon Aire Park, South Dade Park, Sabal Chase
Park and Curtin Interactive Park. Kendall Soccer Park Turf
Replacement as well as providing LA Support Services as
an in-house consultant. Miller Legg has also performed a
number of other services for PROS, including Surveying
and SUE services under a continuing services contract
(Underline Brickell Backyard, Kendall Soccer Park Turf
Replacement, Oak Grove Park, Matheson Hammock
Park) and environmental and civil services for projects
such as the Biscayne Everglades Greenway Trail Segment
D.
Florida Department of Transportation District 6
Biscayne Boulevard - For three sections of the award-
winning historic Biscayne Boulevard roadway in the
City of Miami, Miller Legg prepared tree removal and
relocation for current roadway construction, as well as
future planting, hardscape, and site amenity documents.
This project required coordination with the Miami
Downtown Development Agency (DDA), collection of
field data, documentation of the information in graphic
and text formats, and coordination of the proposed
improvements with local municipalities and community
associations.
This five-year Biscayne Boulevard revitalization project
was part of a multi-year continuing service contract
with FDOT District 6. The project was recognized by the
Florida Chapter of the American Society of Landscape
Architects for Outstanding Design.
Multi-disciplinary firm: Miller Legg’s staff members
routinely work together on a broad spectrum of projects,
and typically on concurrent assignments. A fundamental
benefit of our in-house multi-disciplinary environment
is that it allows each department to gain first-hand
knowledge of the important technical contribution of
each other service area in successful project execution.
We understand the importance of incorporating both
the natural environment and engineered systems to
maintain resources from the building level out to the
broader landscape level. Our landscape architects
enhance the natural setting by creating improved areas
that mesh with instead of standing apart from the
environment. Our environmental biologists work closely
with our engineers and planes throughout project design
to ensure critical site elements are preserved, while also
identifying potential opportunities to showcase the
natural environment.
Arborist Services: Miller Legg has found that more and
more clients are seeking arborist services in their project
scopes. Miller Legg has responded to this demand and
we now have four (4) ISA certified arborists on staff.
c. UNIQUE SKILLS AND QUALIFICATIONS
Page 33Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
4.1 Firm Qualifications and Experience
Use of Silva Cells: Miller Legg has utilized silva cells in our
designs for projects which involve sidewalk/pedestrian
improvements where space is limited and trees are
mature. These cells are a modular suspended pavement
system that use soil to create forest-like conditions in
the city, supporting large tree growth and providing
powerful on-site stormwater management through
absorption, evapotranspiration, and interception.
CPTED (Crime Prevention Through Environmental
Design): The basis of CPTED is that proper design and
effective use of the built environment can reduce
crime. All our park project designs utilize the principles
and practices of CPTED to provide a safe recreational
amenity for Park users and adjacent landowners.
Through natural surveillance, access control, territorial
reinforcement, and maintenance and management, the
resulting environment will discourage or impede criminal
behavior. The implementation of these principles, when
considered early in the design process, does not increase
costs and ultimately supports a safer community.
Habitat Assessment / Restoration: With our in-house
biological, environmental and engineering staff and a
range of over 5,000 acres of habitat restoration projects,
Miller Legg has an unsurpassed expertise with natural
areas that are successfully integrated with passive
recreational uses, resulting in award-winning projects.
Some of these include City of Plantation Plantation
Preserve, Pembroke Pines Preserve, and Broward
County West Lake Park. This experience can provide
environmental amenities along the existing lake that can
not only enhance the recreational experience but also
improve water quality and add educational opportunities.
Sustainable Best Management Practices: Our landscape
designs strive to incorporate sustainability to minimize
the consuming effect on the environment. We integrate
systems and materials that are cyclical in design and use
and have a benign or positive effect on the environment,
such as the use of native plants, xeriscaping, green building
materials, among others. An emphasis on sustainable
design, in combination with long-lasting products that
positively affect the economic viability of a project, are
not just good for the environment; they provide cost
savings in the long run though reduced energy and water
usage costs. Our firm has worked on numerous projects
which incorporate advancing technology and concepts,
ranging from pervious pavement, incorporation of
bioswales and other filtration systems to create a
treatment train concept that allows for stormwater to
be stored, reused for irrigation or hydration of natural
systems and natural filtration, with as much as possible
recharge and reduction of discharge. Our landscape
architects augment nature by designing landscape
enhancements that blend with the environment. We
work to identify the most effective and durable designs
and to assess repair methods for existing structures.
Evaluating both initial and periodic costs of different
repair strategies can guide our Client in obtaining better
overall value for its current maintenance dollars. Work
done at an earlier stage will not only cost less, but will
reduce the rate of deterioration, creating savings now
and in the future. Miller Legg has designed dozens of
active and passive park projects in South Florida, both
urban and rural locations, which consider and include
resiliency design elements. Major elements considered
are plant selection as well as material selection.
Our design Team focuses on the sustainability of
parks projects. This begins with integrating any
existing environmental resources and/or identifying
environmental opportunities within proximity of a
park. Integration of any native habitat, xeriscaping
or existing desirable plant material into the design
Page 34Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
4.1 Firm Qualifications and Experience
can reduce the initial construction cost, as well as the
long-term maintenance costs and efforts required for
the park. The proper selection of plant material also
provides for resiliency, allowing the project to endure
rising sea levels, increased hurricane, and tropical
storms, as well as adapt to increased salt air. In selecting
resilient plants, we recommend native species because
they are low maintenance, require less water, less
fertilizer, are adapted to the local environment, and are
capable of withstanding major storms and hurricanes.
Understanding planting conditions is critical in selecting
the right material for wet conditions, dry conditions,
or plant material that can handle both. Our landscape
architects and designers follow grades and standards as
well as ASNI and ISA Guidelines to ensure plant material
being installed is of the highest quality.
Material selection is a similar process. Miller Legg
landscape architects and designers recommend using
certain types of metals such as aluminum close to coastal
areas to resist rust, using pervious/porous concrete
to allow natural drainage to continue through the soil,
and using polymer/wood blends to meet aesthetic
requirements with maintenance/longevity requirements.
We work to identify the most effective and durable
designs, evaluating the initial cost of enhancements such
as concrete quality, admixtures and corrosion protection,
balanced against future maintenance expenses.
These principles have been implemented in such
diverse design projects as: Doral Glades Park, Biscayne
Everglades Greenway Trail, Broward County Long Key
Habitat Restoration, Miramar Pineland Nature Center
Design/Build, Tradewinds Park Equestrian Trails, Miami
Baywalk Phase 3, Coral Springs Red Lichen Sanctuary, FIU
Bird Basin Land Management, Miami Dade Expressway
Authority Design/Build Central Boulevard and FIU
International Center for Tropical Botany.
Permitting Excellence: Miller Legg has permitted a
significant number of similar projects throughout the state
and are very familiar with infrastructure improvements
and environmental regulations that will apply to this
project. Our experience serves to streamline the design
and permitting process and allow for a fluid transition
from design to construction, while avoiding delays in the
overall project schedule. We actively follow the agency
reviews and prompt these bodies for comments and
issuance of the permits. Upon issuance, we implement
our tracking summary sheet that is used to view the
permit status and expiration dates for the project. We
streamline the design and permitting process and allow
for a fluid transition from design to construction, while
avoiding delays in the overall project schedule. We have
an impeccable record of no violations of federal, state,
or local law or regulations.
Communication: Through our many projects we
have learned not to be passive. We have found it is
important to engage the local utilities companies, local
municipalities, and have great communication. This
will ensure each project has minimal conflicts during
design and construction. Again, in addition to great
communication, our landscape analysis and opportunity
plans ensure the final landscape and Irrigation design is
functional, aesthetic, and low maintenance. We have
also learned to look for innovative ideas that will help
simplify, beautify, and increase the longevity of the
landscape on FDOT projects.
Cost Estimating and Control: Our substantive prior
experience working with a variety of municipalities
including Sunny Isles Beach, has enabled us to develop
quality, sustainable designs within budgetary constraints.
We can provide the City with unmatched planning and
design efforts required for any project that might be
assigned under this Contract. Our Principal-in-Charge,
Michael Kroll, RLA, FASLA, ensures that our Team has the
resources available to complete the City’s projects on
time and within your established construction budgets.
Miller Legg fully appreciates the budget challenges
posed by the COVID 19 economic downturn. The
financial impact on improvement programs will result
in curtailment or possible cancellation of some planned
projects. Our firm is no stranger to this new environment,
having successfully consulted with many municipalities
during previous difficult economic periods. Miller Legg
d. COST CONTROL, QUALITY CONTROL,
PROJECT COORDINATION WITH
SUBCONSULTANTS AND CITY
Page 35Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
4.1 Firm Qualifications and Experience
knows how to expertly manage municipal projects with
very tight budgets and deadlines and we will direct our
project Team accordingly in partnership with the City of
Sunny Isles Beach Project Manager. Our firm utilizes the
following tried and true methods for ensuring that our
designs remain within the established budget:
• First, we uphold the project budget through
strict observance of the schedule and our quality
assurance program because we know design flaws
and delays result in construction cost overruns.
• Second, we complete a preliminary construction
cost estimate at every submittal to ensure our
design is within the cost requirements or to
determine whether value engineering alternatives
can be incorporated without impacting the
purpose set forth by the Project Manager.
• Third, changes in scope or design direction will
be discussed with the Project Manager to ensure
that everyone understands the ramifications of
that change on the construction cost budget. This
attention to detail in our processes is the core of
Miller Legg’s cost control efforts. Constructability
reviews and a realistic understanding of the time
needed for construction completion help us to
guide our clients to detail these constraints in
the contract documents. This ensures either that
the construction schedule is pragmatic and can
be accomplished without incurring acceleration
costs, or that these acceleration costs have been
anticipated in the cost estimates where the need
for expedited construction outweighs the higher
costs associated.
• Finally, contractor-initiated value engineering
options are thoroughly reviewed and discussed
with our clients. It is critical to ensure that the quality
and functionality of the project is not sacrificed to
these requested changes and that consequential
changes such as permit modifications are factored
into a value engineering proposal to fully assess
the benefits and potential pitfalls if the proposal is
accepted.
Client Satisfaction And Complaint Resolution: Miller
Legg’s hands-on project management approach will
ensure transparent and regular communication among
Team members and the City of Sunny Isles Beach. We
know from experience that client expectations can only
be met if those expectations are spelled out, which is
why effective communication is key for project delivery
excellence. The City depends on our insistence on
maintaining these real time tracking methods to give
Page 36Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
4.1 Firm Qualifications and Experience
reassurance that a project is on track and provide advance
warning of any potential issues. If a conflict were to arise
between the intent of a project and satisfying for instance
the permitting requirements for that assignment, the
project manager would arrange a meeting with the City,
the permitting agency staff and the appropriate members
of the Miller Legg Team to further define the source of the
conflict, explore alternatives, and seek a resolution that
is satisfactory to all parties involved. However, because
we have the expertise in-house to anticipate and address
such concerns in advance of submitting, these conflicts
are not common in our project permitting efforts.
Quality Assurance and Quality Control: Miller Legg
is committed to producing cost-efficient and high-
quality deliverables through significant quality control
procedures. William (Bill) Schipske, PE will oversee the
Quality Assurance Program throughout this Contract
and will ensure all project elements are reviewed
for their individual and collective technical merit and
thoroughness in conveying the requirements to the
agencies and contractors. The stages are interrelated in a
sequence which forms our Quality Control Process logic.
Quality Assurance begins with a thorough review of the
project scope and defining key issues to be addressed
with City of Sunny Isles Beach staff and adherence to City
codes and criteria. It is incumbent upon the project design
professionals to ascertain the full breadth of the scope
prior to commencement of the project design. Insisting
on provision of accurate as-built data and surveys is
critical. Where accurate data doesn’t exist, obtaining
accurate survey data and the use of ground penetration
radar (GPR) is necessary. The best design begins with
the most accurate scope and design information.
Quality Control is a multiple step process beginning with
each design professional editing and reviewing his/her
work as the design process evolves. Most of our projects
have 50%, 90%, and 100% submittal stages. Each stage
has includes a peer review of both plans and calculations
and compliance to codes and criteria. All design stages
are reviewed both by the project design professional
and by the designated Quality Control Manager. Our
experience is that design errors and/or omissions occur
less frequently with this process because these errors
are identified prior to the completion of the construction
plans.
Project Coordination with Subconsultants and City:
Miller Legg’s multi-disciplinary staff members routinely
work together on a broad spectrum of concurrent
projects. We handle and prioritize our workload based
on the demands of multiple simultaneous projects. We
have consistently proven to our clients, including the
City of Sunny Isles Beach, our aptitude for delivering
assignments on time (often expedited) and within
budget by dedicating appropriate resources, technology
and equipment. We take seriously our role as head of
the consulting team and our responsibility for accurate
and timely project execution according to the contract
documents.
Given our long history in the South Florida AE marketplace,
our project managers have experience in administering
teams of fellow consultants in the execution of numerous
projects for our clients. Miller Legg selects its teaming
partners based on the quality of their previous work
with us, their dependability and responsiveness as part
of a cohesive team. We determine from the outset the
responsibilities of each teaming partner and insist each
set of deliverables from them is forthcoming, timely, and
accurate, so as to meet the project schedule and other
requirements. We ensure that each firm shares our
work ethic, attention to client service and quality control
philosophy.
Miller Legg has a staff of 50 professional employees
including licensed engineers, surveyors and landscape
architects, supported by construction inspectors,
landscape and irrigation designers and inspectors,
certified arborists, GIS coordinators, biologists and
environmental specialists and planners. All key Miller
Legg staff included on our organization chart are based
in our Miami and Fort Lauderdale offices which will be
servicing this Sunny Isles Beach project.
e. EMPLOYEES AND HEADQUARTERS
STAFF
Page 37Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
4.1 Firm Qualifications and Experience
• Baptist Health South Florida AE Services Master
Agreements – All Services
• Bonterra Community Development District (CDD)
Civil Engineering
• Broward College - Civil/Testing
• Broward County Qualified Vendor List for
Environmental, Surveying & Other Professional
Consulting Svcs
• City of Coconut Creek - Architecture, LA and Urban
Design Services (RFQ 10-06-21-11)
• City of Coral Gables - Landscaping Architectural
Consulting (RFQ 2021-008)
• City of Coral Springs General Prof Engineering/
Architectural Services RLOI 20-B-298 (LA &
Landscape Inspection)
• City of Dania Beach/CRA Arch, Surveying, LA,
Engineering Consulting (RFQ 20-005) (Utilities Eng,
Enviro, LA)
• City of Florida City - Professional Engineering (RFQ
2017 - 002)
• City of Homestead - Continuing Architectural and
Engineering Services for Various Projects
• City of Lauderhill Misc. Professional Services
(Land Development, Civil-Site and Drainage
Systems; Wastewater & Lift Stations, Landscape
Architecture) RFQ 2019-057
• City of Miami - CIP Misc LA Services (RFQ 19-20-011)
• City of Miami - Civil Engineering Services for
Miscellaneous Projects (RFQ 16-17-063)
• City of Miami DDA Planning, Engineering,
Architecture and Design As Needed Services (RFQ
18-19-01)
• City of Miami Beach Architecture/Engineering
Services for Capital Renewal and Replacement
Projects (2018-141-ND)
• City of Miami Beach AE Services on As Needed
Basis - Environmental Engineering (2020-096-ND)
• City of Miramar AE Library (RFQ 22-12-10-0-2021/
MAR) – All Services
• City of Oakland Park - Professional Services for
Misc Projects (RFQ 052819) – All Services
• City of Pembroke Pines AE Library - Landscape
Architecture, Surveying (PSEN-18-02)
• City of Pembroke Pines Land Surveying (PSEN-19-
19)
• City of Plantation AE - Constr/Proj Mgmt, Landscape
Arch, Enviro Eng (RFQ-02cu7-20-0-2020/CP)
• City of Pompano Beach and CRA - Landscape
Architecture (RLI-T25-20)
• City of Tamarac - Landscape Architecture (RFQ 16-
23Q)
• City of West Palm Beach - General Engineering
Services (RFQ 18-19-405)
• Florida Atlantic University - Civil Engineering
Services
• Florida International University Civil Engineering
Professional Services
• Lake County - ISA Arborist RFP #20-0528-B *
• Maple Ridge Community Development District
(CDD) Engineering Services (Inframark) *
• Miami (Nicklaus) Children’s Hospital Standard
Contractor Agreement *- All Services
• Miami Dade College Engineering Services Open
Market Pool-Engineering LA, Survey (2020-RB-15)
(AEM21009)
• Miami-Dade County Equitable Distribution (EDP)
Program Continuous Prof Svcs (EDP-PSA-2024) All
Services
• Miami-Dade County Equitable Distribution (EDP)
Program for Regulatory & Economic Resource
(RER) Dept (Contract: EDP-PSA-2024; Proj: RE-
EDP-PE-DE-66WM) All Services
• Miami-Dade County Equitable Distribution (EDP)
Program: Multiple Parks Surveying & Underground
Utility Location Services - EDP Project EDP-PR-
9999990P
• Miami-Dade Co Land & Eng Surveying - mainly
Dept Transportation & Public Works (E19-
DTPW-04-01-01) Engineering
• Miami-Dade Co. WASD Design & Related Services
Local Wastewater Pump Stations (E15-WASD-02)
* Engineering
• Miami-Dade Co. Countywide Infrastructure
Investment Program (CIIP) for the Rehabilitation
of ISD Surface Lots/Parking Lots (E20-ISD-03)
• Miami-Dade Co. WASD General Land and
Engineering Surveying and Mapping (E20-WASD-
01A)
• Nova Southeastern University Professional
Services (All) * All Services
• Northern Palm Beach Co. Improvement District
Consulting Engineer * All Services
• School Board of Broward County - Open End
Surveying Consulting (17-113C)
• School Board of Broward County Open End Civil
Engineering (17-114C)
• School District of Palm Beach County Civil
Engineering (RFP 20C-025R) *
• Seminole Tribe of Florida Enviro Engineering
(ERMD) (PUR2021-01-014)
• Seminole Tribe of Florida TW Engineering Services
(Real Estate) (RFQ 148-2019) Surv_P&Z review
f. CURRENT MILLER LEGG CONTINUING
SERVICES CONTRACT AS A PRIME
CONSULTANT
Page 38Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
4.1 Firm Qualifications and Experience
• Seminole Tribe of Florida TW Stormwater Master
Planning and Prof Eng Svcs (RFQ 84-2019)
• St. Lucie Co. General Environmental Consulting
Services (Contract C20-01-206)
• Town of Davie Utilities Continuing Services - Gen
Utility Engineering (RFQ RM-21-16) *
• Town of Lauderdale By The Sea (RFQ 16-0901) LA
and Engineering
• Town of Miami Lakes Misc. Architectural &
Engineering Svcs - won for LA (RFQ 2017-31)
• Village of Palmetto Bay Landscape Architecture
* Contract Term until 2025 or open-ended
The numbers of Miller Legg staff and subconsultant staff
involved depends on the individual projects performed
under these continuing services contracts
Relevant to You:
3D Laser Scanner
• Data acquisition up to 500,000
measures/second
• Range of 800 meters
• Create
»As-built drawings
»CAD/REVIT models
• Additional uses:
»Route survey
»Topography
»Earthwork, volume
calculations
»Point Clouds
Page 39Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
4.2. Qualification of Key Personnel Assigned to Engagement
MICHAEL KROLL, RLA, FASLA
Principal-in-Charge
MIGUEL JUNCAL, RLA, CA
Assistant Project Manager
ANDREW PEREDA, MLA
Landscape Designer
LIUDMILA FUENTES, MLA
Landscape Designer / Community Outreach
NELSON PEREZ
Landscape Designer
MICHAEL BRADLEY, MLA
Landscape Designer
JARRED RANDALL
Landscape Designer
WILLIAM MOHLER, CA, TRAQ, PWS, CLI
Certified Landscape Inspector / Arborist
Supported by:
Matthew Dancho, CA, MS, Biologist
Paul Mann, CA, TRAQ, Senior Environmental Specialist
Jennifer Shipley, Environmental Scientist
JOAQUIN MOJICA, PE
Project Engineer
Supported by:
William Schipske, PE, QA/QC
Peter Pellerito, PE, Project Engineer
Glen Harrelson, PE, Project Engineer
Christopher Andreoni, PE, Project Engineer
Ismael Santana, PE, Project Engineer
Carlos Vazquez, Project Engineer
MARTIN ROSSI, PSM
Project Surveyor / SUE Services / 3D Laser Scanner
Supported by:
Larisa Podolskaya, CST I, Senior CAD Technician
Sandro Elvir, CST I, Senior CAD Technician
Gerald Edelman, CST I, Survey Party Chief
BRIAN SHORE, RLA
Project Manager
Page 40Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
4.2. Qualification of Key Personnel Assigned to Engagement
Years of Experience: 36
Years With the Firm: 34
Registrations & Certifications:
Registered Landscape Architect, FL, 1989
Registered Landscape Architect, TX, 2009
Fellow American Society of Landscape Architects, 2014
Education:
Bachelor of Landscape Architecture
University of Florida, 1986
Graduate Studies, Urban and Regional Planning
Florida State University, 1989
Publications & Presentations:
Florida Educational Facilities Planners' Association, Inc.,
Making Connections: Benefits of On-Campus Mass Transit
Elements, July 2014, Presenter/Speaker
Florida Planning and Zoning Association, Public Private
Partnerships, June 2007, Presenter/Speaker
Professional & Civic Activities:
Fellow, American Society of Landscape Architects
2021 Chair, Broward County Bicycle & Pedestrian Advisory
Committee, 2009-present
Member, Broward Section, American Planning Association
Past Chair, Broward Section, American Society of Landscape
Architects
Member, Florida Board of Landscape Architecture, 2013-
current
Member, Florida Earth Foundation, Engineering Advisory
Committee, 2004-present
Member, Florida Recreation and Park Association
Member, Florida Redevelopment Association
Recipient, UF Distinguished Landscape Architect Alumnus
Award, 2013
Member, Urban Land Institute
Professional Experience:
Mr. Kroll, President of Miller Legg, has
been actively involved in projects ranging
from large scale habitat restoration to
international urban redevelopment
projects. His 35+/-year career has
concentrated on planning, infrastructure,
open space, transportation and
redevelopment, principally in South
Florida.
Mr. Kroll's diverse professional
experience has led to projects that
successfully integrate environmental,
planning and landscape architectural
services. Under his leadership, Miller
Legg develops project solutions that
respond to the natural environment,
respect the social fabric and create
sustainable aesthetic spaces.
Relevant Project Experience:
City of Sunny Isles Beach Pelican
Community Park - A three-acre active
park site, for which Miller Legg managed
landscape architecture, irrigation,
engineering, surveying and architecture
designs for a baseball field, recreation
building, playground structure,
gymnasium, and related site amenities
within the City of Sunny Isles Beach.
The project management team at Miller
Legg received recognition from the City
for their involvement in the design
completion of the park. In addition,
Miller Legg provided construction
observation services. In addition, we
also provided grant assistance to secure
a Florida Recreational Development
Assistant Program (FRDAP) grant for
$200,000. FRDAP is a competitive grant
program that provides financial
assistance to local governments for
development or acquisition of land for
public outdoor recreational purposes.
Award: Award of Merit, American Society of
Landscape Architects, Florida Chapter, 2009
City of Sunny Isles Beach Gwen
Margolis Park and Pelican
Community Park Artificial Turf -
The project consisted of the
reconstruction of existing natural turf
fields at Pelican Community Park and
Senator Gwen Margolis Park in the City
of Sunny Isles Beach with artificial turf.
Miller Legg provided the preparation and
permitting of drainage plans to collect
under the new drain systems installed as
part of the project, as well as surveying
services. In addition, construction
observation was provided to verify
compliance with the plans and for the
certification of the project through
regulatory agencies.
City of Miami Beach 20th Street &
Sunset Drive Pocket Park - Under
our Continuing Services Contract with
the City of Miami Beach, Miller Legg was
awarded an assignment to provide
survey, civil, geotechnical, electrical,
structural engineering and landscape
architecture services for the design,
permitting and construction of a new
ADA-accessible .33-acre pocket park at
20th Street and Sunset Drive. The firm
prepared a boundary and topographic
survey, assisted with the planning of key
program elements and performed
schematic design, design development,
construction document, bidding and
construction tasks. The design
incorporates Crime Prevention Through
Environmental Design (CPTED)
principles. Arborist and irrigation design
services were also furnished for this
project.
Palm Beach Gardens Tennis Center
- The City of Palm Beach Gardens
planned for a new clubhouse at its
Tennis Center, a premier community
public 18-court tennis facility and
recipient of a 2014 US Tennis
Association National Outstanding Facility
Award. As part of the OLC architecture
team, Miller Legg provided civil and
landscape architecture design services
for the new 12,000 SF building. Miller
Legg's scope of services included
schematic design, design development,
construction document preparation and
construction observation phases.
Michael Kroll, RLA, FASLA
President | Principal-in-Charge (5% Availability)
Page 41Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
4.2. Qualification of Key Personnel Assigned to Engagement
Permitting was coordinated through the
South Florida Water Management
Division, Palm Beach Gardens Fire,
Health and Public Works Departments
as well as Seacoast Utility Authority.
Town of Lauderdale-By-the-Sea
Poinciana/Bougainvillea Roadway
and Parking Improvements - Under
the firm's Continuing Services Contract,
Miller Legg provided design and
permitting services for parking, roadway
and landscape architectural
improvements for the Poinciana Street
and Bougainvillea Drive area north of
Commercial Boulevard to alleviate
congestion along the parallel corridor of
SR A1A in the Town of Lauderdale-By-
The-Sea. Services include: roadway and
parking area design, lighting, utility
coordination, permitting, landscape,
hardscape and irrigation, and pre- and
post-construction observation services.
City of Lauderhill Sports Park -
Miller Legg was retained by the City of
Lauderhill to provide civil engineering
design, stormwater permitting, landscape
architecture, irrigation design,
construction specifications and bidding
assistance services for proposed
amenities improvements at the 12-acre
Lauderhill Sports Park. Replacement of
the baseball field and cricket pitch
natural grass with synthetic turf and the
football scoreboard replacement tasks
have been finalized. Miller Legg has also
completed design of the playground area
wood chip surface conversion to
synthetic turf, playground shade,
modifications to portions of the fitness
trail and the addition of new fitness
stations trail and exercise equipment.
Miami-Dade County Parks,
Recreation & Open Space (PROS)
Debbie Curtin Interactive Park -
Under Miller Legg’s Continuing Services
Contract with PROS, Miller Legg was
responsible for development of the
conceptual rendering plans for this
exciting interactive park. Features of the
interactive components include musical
instruments such as a goblet drum, and
vivo metallophone, kettle drum,
grandioso chimes, kundu drum, animato
metallophone, bongo, hourglass and ring-
a-bell panels, textured features such as
marble and tracing panels, as well as
climbers including a custom rope
climber, stone block climb, custom hill
net, a bobble rider single and double and
a global motion freestanding play
structure. The conceptual plans were
presented to the County. The firm was
also responsible for developing
construction documents.
City of Coral Gables War Memorial
Youth Center Landscape &
Engineering - This City of Coral
Gables 7-acre War Memorial Youth
Center in Miami Dade County
represents a living memorial to Coral
Gables World War II veterans. The
project includes improvements to multi-
purpose athletic fields. Miller Legg was
responsible for the landscape
architecture, civil engineering design and
permitting of the improvement program.
Specific improvements included athletic
field drainage, re-sodding with Bermuda
"Celebration" turf and irrigation design.
The irrigation system ties into a non-
potable well system. Drainage
improvements consist of subsurface field
improvements that integrate with the
existing exfiltration and subsurface
drainage systems. Additional services
provided include: design development,
final construction documents, and
construction administration. Miller Legg
collaborated with MC Harry Associates
on this project.
City of Pembroke Pines D/B Taft
Street Improvements - Miller Legg
was on the RJ Behar team for this Taft
Street Design Build project for the City
of Pembroke Pines. The firm's scope of
services was landscape architectural
design and post design services and
included the development of design and
contract documents including plans and
specifications. Support during the
construction phase with Requests for
Information and contractor submittals
was also provided.
City of Miami Museum Park
Baywalk Phase 3 - Miller Legg
provided landscape architecture, civil
engineering, lighting/electrical
engineering, surveying, permitting and
limited construction administration
services for the Miami Baywalk Phase 3
Project. Permitting for project
improvements was provided through the
City of Miami, Miami-Dade County and
South Florida Water Management
District. Underground utility designation
for electric and drainage utilities was
performed.The project is a 1/4 mile
pedestrian-oriented urban waterfront
park and promenade on Biscayne Bay,
located adjacent to the east coast
greenway. It provides a unique open
space that links the American Airlines
Arena, Biscayne Boulevard, and Museum
Park. The Baywalk design includes
custom native stone benches, extensive
paver pedestrian spaces, salt-tolerant
tropical plantings, as well as themed
lighting and site amenities. Due to
historic maritime activities in the project
area, soil conditions were addressed
through the design of unique drainage
facilities that minimized potential
groundwater impacts. The Baywalk
design solution also improved visibility
and lighting in the area to discourage
vagrancy issues that existed. The planting
design not only enhanced aesthetics, but
also buffered unsightly adjacent parking
and utility areas and minimized exposed
surfaces that had been subject to graffiti.
This project was performed under our
Miscellaneous Landscape Architectural
Services contract.
Greater Boca Raton Beach and
Parks District Ocean Breeze
Master Plan - Miller Legg was retained
by the Greater Boca Raton Beach and
Parks District (GBRBPD) to prepare a
Master Plan for Ocean Breeze Park, site
of the former Boca Teeca Country Club
and Golf Course. The Master Plan will
reflect the District's desire to provide a
diverse recreational amenity at this 212-
acre property for City residents while
considering the specific desires and
concerns of the adjacent residential
communities. The Plan will address
Ocean Breeze's future facilities, uses,
programs, operation, maintenance and
funding and recommend Park
modifications, improvements,
enhancements and additional uses.
Recreational elements may include
passive park facilities (trails, walking
paths, open fields/areas), golf
course/facilities, active park uses
(playgrounds, tennis courts, sport courts,
aquatics), community center/facilities and
potential revenue-generating
opportunities.
Page 424.2. Qualification of Key Personnel Assigned to Engagement
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
Years of Experience: 22
Years With the Firm: 22
Registrations & Certifications:
Registered Landscape Architect, FL, 2005
FDOT Intermediate Maintenance of Traffic, FL, 2013
Education:
Bachelor of Science, Landscape Architecture
North Carolina A&T State University, 2000
Continuing Education:
Eminent Domain for Landscape Architects, 2013
FDOT Landscape Highway Seminar, 2005, 2006, 2008 and
2013
FDOT Outdoor Advertising Workshop, November 2008 and
February 2010
FDOT Plan Reviewer's Workshop, November 2006 and
November 2007
FDOT Specifications Package Preparation Training Certificate,
2016
Irrigation: The End to Water Waste in Landscapes 2013
Landscape Palm Diseases, 2013
LAP Project Inception to Notice to Proceed, October 2007
LAP Training for Right-of-Way and Real Estate Acquisition,
May 2008
PSMJ Project Management Boot Camp, 2007
Professional Experience:
As a Senior Landscape Architect, Mr.
Shore has significant experience in
landscape architectural design and
landscape construction services for a
variety of public and private projects.
Specialties include landscape, hardscape,
and irrigation design services for
streetscape and roadway projects
including the Florida Department of
Transportation (FDOT), all aspects of
active and passive park design, healthcare
campuses, and environmental wetland
habitat creation. Other experience
includes various residential and
commercial projects. Mr. Shore is a
Senior Associate of the firm.
Relevant Project Experience:
City of Sunny Isles Beach Pelican
Community Park - A three-acre active
park site, for which Miller Legg managed
landscape architecture, irrigation,
engineering, surveying and architecture
designs for a baseball field, recreation
building, playground structure,
gymnasium, and related site amenities
within the City of Sunny Isles Beach.
The project management team at Miller
Legg received recognition from the City
for their involvement in the design
completion of the park. In addition,
Miller Legg provided construction
observation services. In addition, we
also provided grant assistance to secure
a Florida Recreational Development
Assistant Program (FRDAP) grant for
$200,000. FRDAP is a competitive grant
program that provides financial
assistance to local governments for
development or acquisition of land for
public outdoor recreational purposes.
Award: Award of Merit, American Society of
Landscape Architects, Florida Chapter, 2009
City of Cocoa Beach CRA
Minutemen Causeway - Minutemen
Causeway is the “main street” within the
Cocoa Beach Central Business District,
providing a front door to City Hall and
direct access to the beach. Over the last
30 years, development within the
Minutemen Causeway corridor included
a mix of commercial, residential, and
lodging properties. This development
drastically increased the impervious
conditions of the corridor and
significantly impacted the stormwater
system within the area, causing regular
flooding issues. Miller Legg’s solutions
for the Minutemen Causeway project
was a holistic design approach to
improve the stormwater / drainage
issues, while invigorating the area’s
economy by creating a pedestrian-
oriented beachfront promenade and
streetscapes. The project consisted of
significant landscape beautification and
geometric modifications to the corridor
to promote a pedestrian-friendly
environment and to stimulate economic
development. In conjunction with the
redevelopment, the project included
low-impact stormwater facilities to meet
the Total Maximum Daily Load reduction
requirements, as outlined within the
Indian River Lagoon Basin Management
Action Plan. These stormwater
improvements included pervious paver
sidewalks and parallel parking, bio-swales
with native vegetation, and underground
stormwater infiltration facilities with
nutrient absorption materials. The
entire project was a City pilot program
for Low Impact Design (LID) and Best
Management Practices (BMP) for
stormwater management. Utilizing this
innovative approach, this project was
able to secure significant funding from
the State, including almost $5 million
from the Florida Department of
Environmental Protection.
City of Coconut Creek Sample
Road Streetscape - Miller Legg
prepared the planting and hardscape
design of this four-lane divided roadway
in Broward County. The design
incorporated existing trees and palms
and established a plant and paver palette
theme for future Florida Friendly
landscape in roadways within the City of
Coconut Creek. In addition to landscape,
irrigation and hardscape designs, grant
Brian Shore, RLA
Senior Landscape Architect | Project Manager (60% Availability)
Page 434.2. Qualification of Key Personnel Assigned to Engagement
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
preparation services were provided as
part of this project. As part of a
miscellaneous services contract with the
City, Miller Legg prepared the Florida
Highway Beautification Council Grant
Application and developed Landscape
Improvement Design Documents for
Sample Road. This approximately three-
mile roadway serves as the major east-
west corridor through the City of
Coconut Creek. The grant application
was successful in acquiring $225,000 in
matching funds for the project. Award:
Broward Beautiful Third Place for
Roadway/Swale Beautification, Broward
County, 2004
City of Lauderhill Sports Park -
Miller Legg was retained by the City of
Lauderhill to provide civil engineering
design, stormwater permitting, landscape
architecture, irrigation design,
construction specifications and bidding
assistance services for proposed
amenities improvements at the 12-acre
Lauderhill Sports Park. Replacement of
the baseball field and cricket pitch
natural grass with synthetic turf and the
football scoreboard replacement tasks
have been finalized. Miller Legg has also
completed design of the playground area
wood chip surface conversion to
synthetic turf, playground shade,
modifications to portions of the fitness
trail and the addition of new fitness
stations trail and exercise equipment.
City of Lauderdale Lakes C-13
Western Greenway LAP - This
project is generally described as the
design of an FDOT LAP-funded one-mile
greenway along the southern C-13 canal
bank from SR 7 to the Florida Turnpike.
The Project is part of the overall
Greenway Trail System for Broward
County including two municipalities; the
larger portion of which is in the City of
Lauderdale Lakes, the remaining portion
of which, is in the City of Oakland Park.
The Greenway connects to a pedestrian
bridge linking the proposed Greenway to
an existing City Park, City Hall and the
Park Lakes Elementary School. Services
provided include landscape architecture,
surveying, environmental permitting,
NEPA documentation, SFWMD Canal
ROW permitting, and engineering
services.
City of Pembroke Pines
Streetscape Design Guidelines -
Miller Legg worked on the City of
Pembroke Pines City Wide Streetscape
Master Plan which included the creation
of context sensitive design guidelines for
the roadway corridors throughout the
City including accommodations for
mobility. This Master Plan looked at both
the corridor segment and intersection
component. Corridor segment
components included: median plantings,
‘Side of Road’ (along the right-of-way or
street edge) plantings, street trees and
specialty plantings. Intersection segment
components included: Median nose
treatments, crosswalks, expanded
pedestrian plazas at the corners,
specialty items and icons. Components
also included some specialty ‘Threshold’
Plantings, if there was adequate space.
Residential streets included ‘Family
Ways’. These streets are intra-
neighborhood linkages with
improvements designed to enhance
alternative modes of transportation –
such as walking and biking. The Family
Ways more effectively links residential
communities with schools and parks and
with commercial nodes, too, for
shopping and to promote commerce at a
local level.
City of Pembroke Pines D/B Taft
Street Improvements - Miller Legg
was on the RJ Behar team for this Taft
Street Design Build project for the City
of Pembroke Pines. The firm's scope of
services was landscape architectural
design and post design services and
included the development of design and
contract documents including plans and
specifications. Support during the
construction phase with Requests for
Information and contractor submittals
was also provided.
City of Wilton Manors Public
Complex - The objective of this project
was to develop a sustainable design
through the use of Best Management
Practices, (BMP's) incorporating
xeriscaping principles for irrigation and
landscaping, including the careful
selection of native and adaptive plant
species which are hardy and adaptive to
the South Florida sub-region, require
minimal maintenance after initial plant
establishment, avoid monoculture
planting and would also thrive in the
locations chosen and not require
irrigation in the majority of the
landscaped areas after the first year of
plant establishment. Groundcover,
instead of sod, was also incorporated to
further achieve the long term goal of a
sustainable environment, with regards to
chemical uses and provides for an overall
less intensive landscape for continued
maintenance. Working closely with the
Project Architect, the design team
included the City's newly adopted
Streetscape Design Guidelines and
implemented a harmonious placement of
plants to complement the building’s
architectural features. Special focus was
also given to incorporate shading for the
City Hall Complex Building and in
pedestrianized areas to reduce heat
island effects and increase the energy
efficiency of the future home for the City
of Wilton Manors. Services provided for
this project include development of
conceptual and final landscape
architecture plans, color renderings and
construction phase services.
City of Port St. Lucie US 1
Irrigation and Landscape Design -
Miller Legg is preparing for the City of
Port St. Lucie an update to the firm's
2015 irrigation and landscape design
plans for 3.5 miles of US Highway 1 from
Westmoreland Boulevard to Village
Green Drive. Services comprise
proposed concept and construction
landscape and hardscape improvement
plans including median hardscape design,
shrub, groundcover and tree plantings or
removal, irrigation design and utility
coordination. The plans will be
submitted to FDOT for approval. The
scope includes a presentation of plan
exhibits to the City Council by the firm.
City of Miami River Greenways -
Segment D – As a subconsultant, Miller
Legg was contracted to prepare
landscape architecture design plans for
Segment D of the City of Miami
Riverwalk/Greenway Program along the
Miami River. The project area includes a
four-block (3/10 of a mile) area in
conjunction with roadway improvements
to include an eight foot multi-use
pathway, landscape, hardscape and site
furnishings. The project was partially
funded by the Local Agency Program.
Page 444.2. Qualification of Key Personnel Assigned to Engagement
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
Years of Experience: 18
Years With the Firm: 13
Registrations & Certifications:
Registered Landscape Architect, FL, 2014
Certified Arborist, FL, 2018
FDOT Intermediate Maintenance of Traffic, FL, 2019
Education:
Bachelor of Landscape Architecture, Minor in Environmental
Sciences
University of Florida, 2004
Continuing Education:
FDOT LAP Training Certificate, 2018
FDOT Specifications Package Preparation Training Certificate,
2017
RainBird Landscape Irrigation Design Process Certificate,
2018
Professional & Civic Activities:
Member, International Society of Arboriculture
Professional Experience:
Mr. Juncal is a Landscape Architect and
Certified Arborist focused on a variety
of public and private landscape
architecture projects including roadway
landscaping and irrigation, active and
passive park landscape design, higher
educational facilities as well as residential
and commercial projects. Certified
Arborist services include: tree species
identification and inventories, tree
surveys and canopy mapping,
destroyed/damaged tree assessments,
tree value estimates, tree grading, tree
species selection for planting, mangrove
trimming oversight and tree permitting.
Relevant Project Experience:
City of Sunny Isles Beach Pelican
Community Park - A three-acre active
park site, for which Miller Legg managed
landscape architecture, irrigation,
engineering, surveying and architecture
designs for a baseball field, recreation
building, playground structure,
gymnasium, and related site amenities
within the City of Sunny Isles Beach.
The project management team at Miller
Legg received recognition from the City
for their involvement in the design
completion of the park. In addition,
Miller Legg provided construction
observation services. In addition, we
also provided grant assistance to secure
a Florida Recreational Development
Assistant Program (FRDAP) grant for
$200,000. FRDAP is a competitive grant
program that provides financial
assistance to local governments for
development or acquisition of land for
public outdoor recreational purposes.
Award: Award of Merit, American Society of
Landscape Architects, Florida Chapter, 2009
City of Sunny Isles Beach Gwen
Margolis Park and Pelican
Community Park Artificial Turf -
The project consisted of the
reconstruction of existing natural turf
fields at Pelican Community Park and
Senator Gwen Margolis Park in the City
of Sunny Isles Beach with artificial turf.
Miller Legg provided the preparation and
permitting of drainage plans to collect
under the new drain systems installed as
part of the project, as well as surveying
services. In addition, construction
observation was provided to verify
compliance with the plans and for the
certification of the project through
regulatory agencies.
City of South Miami Sunset Drive
Roadway and Beautification
Improvements - For this 1/4-mile
roadway and beautification project along
Sunset Drive/SW 72nd Street from US 1
to SW 57th Avenue, Miller Legg is
providing landscape architecture,
arborist, irrigation and construction
observation services. The project scope
consists of roadway and beautification
improvements which includes proposed
type ‘F’ curb and gutters, the
replacement of sidewalks, and proposing
new trees and plants and specified
locations throughout the project site.
Specific services include tree removal
and disposition, irrigation field
investigation, hardscape design, landscape
design and construction observation
services. Miller Legg is a subconsultant
to Marlin Engineering.
City of Miami Museum Park
Baywalk Phase 3 - Miller Legg
provided landscape architecture, civil
engineering, lighting/electrical
engineering, surveying, permitting and
limited construction administration
services for the Miami Baywalk Phase 3
Project. Permitting for project
improvements was provided through the
City of Miami, Miami-Dade County and
South Florida Water Management
District. Underground utility designation
for electric and drainage utilities was
performed.The project is a 1/4 mile
pedestrian-oriented urban waterfront
park and promenade on Biscayne Bay,
located adjacent to the east coast
greenway. It provides a unique open
space that links the American Airlines
Arena, Biscayne Boulevard, and Museum
Miguel Juncal, RLA, CA
Landscape Architect | Assistant Project Manager (50% Availability)
Page 454.2. Qualification of Key Personnel Assigned to Engagement
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
Park. The Baywalk design includes
custom native stone benches, extensive
paver pedestrian spaces, salt-tolerant
tropical plantings, as well as themed
lighting and site amenities. Due to
historic maritime activities in the project
area, soil conditions were addressed
through the design of unique drainage
facilities that minimized potential
groundwater impacts. The Baywalk
design solution also improved visibility
and lighting in the area to discourage
vagrancy issues that existed. The planting
design not only enhanced aesthetics, but
also buffered unsightly adjacent parking
and utility areas and minimized exposed
surfaces that had been subject to graffiti.
This project was performed under our
Miscellaneous Landscape Architectural
Services contract.
City of Miami Morningside Park
Tennis Center - The City of Miami
Morningside Park created an expanded
and improved tennis facility at this 42-
acre Park. The project included
improvements to an existing seven (7)
courts that had experienced degradation
due to drainage and soil stabilization
issues. A new court layout was
developed to increase the facility to eight
(8) lighted courts and a warm-up training
wall amenity. Other tennis
improvements included upgraded
lighting, fencing ad shaded bench area. A
central courtyard was also developed as
a key element of the project design. This
courtyard created an inviting area for
players and spectators to gather before
and after matches. A themed paver field
with lush landscaping that embraces large
existing ficus trees creates a pleasant
gathering space not previously found at
Morningside Park, and helps establish it
as a premier public tennis destination in
the City of Miami. Miller Legg services
included civil engineering, landscape
architecture, permitting and limited
construction administration to assist the
City in the bidding, observation and
certification of the project
improvements. Arborist services
included evaluating existing trees for
health, longevity and relocation
prospects. Once relocated, the trees
were monitored for ongoing wellbeing
on site. Apart from the City, other
agencies with jurisdiction for this project
include Miami-Dade County Department
of Environmental Resources (DERM) and
South Florida Water Management
District (SFWMD). Received the Facility
Showcase award by the Florida
Recreation & Park Association. Miller
Legg secured this project under the
firm's Continuing Services Agreement
with the City of Miami.
City of Miami Gardens Rolling Oaks
Regional Park - Renovations of Rolling
Oaks Regional Park include construction
of a new one-story 4,000 SF recreation
building, renovated restroom facilities,
expansion of walking trail with lighting,
distance marker, and exercise stations,
new pavilions, new parking lot,
refurbished basketball and tennis courts,
new fencing, new shaded playgrounds,
new landscaping and irrigation, addition
of horseshoe pits, sand volleyball, mini
golf and splashpad, and video system and
WIFI. Miller Legg is providing civil
engineering, landscape architecture and
surveying services for this 7-acre park as
a subconsultant to Synalovski, Romanik
and Saye Architects. The civil scope
includes design of a lift station and on-
site force main extension to service the
proposed Welcome Center. An arborist
assessment of existing trees and palms
was carried out as part of the landscape
architecture services.
City of Miami Fairlawn Community
Park - Under our continuing services
contract with the City of Miami, Miller
Legg was awarded the development of
programming, pre-design/concept,
design, construction document
preparation and construction phase
services for a new park on SW 63rd
Avenue. The scope includes civil
engineering, landscape architecture,
certified arborist, surveying and SUE,
structural, electrical and geotechnical
engineering as well as permitting, opinion
of probable cost and limited
construction administration. The passive
park will contain a shaded/fenced
children's playground, dog run, shared
pedestrian / bicyclist perimeter path,
light bollards, benches, pedestrian pole
lighting, irrigation, water fountain, bike
racks, receptacles, hardscape furniture,
access driveway and perimeter privacy
walls. Permitting will be coordinated
with the City of Miami, Miami-Dade
County DERM, WASD and SFWMD.
Survey services include boundary and
topographic and tree inventory. Miller
Legg will assist the City with the
presentation of conceptual designs at
Community Meetings to gather public
input for a final design.
City of Miami Hadley Park
Synthetic Turf and Park
Improvements - Under Miller Legg's
professional service agreement with the
City of Miami for landscape architectural
services, the firm was retained to
provide civil engineering, landscape
architecture, permitting and limited
construction observation services for the
5.38-acre Hadley Park synthetic turf and
park improvements project. Miller Legg
provided underground utility designation
services in order to prepare an existing
utility map. Schematic design documents
for the proposed improvements were
provided and included client meetings
and preliminary Opinion of Probable
Cost. Final construction documents
were developed for chosen multi-
purpose athletic field layout, fencing,
fitness stations trail, pedestrian
walkways, grading, site amenities, ADA-
accessible ramp, sodding and irrigation.
Permitting was coordinated with the
City, Miami-Dade DERM and SFWMD.
Construction administration services
were delivered, culminating with a
statement of work completion and as-
built submittal.
City of Miami Beach 20th Street &
Sunset Drive Pocket Park - Under
our Continuing Services Contract with
the City of Miami Beach, Miller Legg was
awarded an assignment to provide
survey, civil, geotechnical, electrical,
structural engineering and landscape
architecture services for the design,
permitting and construction of a new
ADA-accessible .33-acre pocket park at
20th Street and Sunset Drive. The firm
prepared a boundary and topographic
survey, assisted with the planning of key
program elements and performed
schematic design, design development,
construction document, bidding and
construction tasks. The design
incorporates Crime Prevention Through
Environmental Design (CPTED)
principles. Arborist and irrigation design
services were also furnished for this
project.
Page 464.2. Qualification of Key Personnel Assigned to Engagement
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
Years of Experience: 7
Years With the Firm: 6
Registrations & Certifications:
FDOT Intermediate Maintenance of Traffic, FL, 2022
Education:
Master of Landscape Architecture
Florida International University, 2015
Associate in Arts
Miami Dade College, 2012
Professional Experience:
Mr. Pereda is a Landscape Designer
responsible for public and private
landscape architectural design projects
including active and passive park
landscape design and roadway
landscaping and irrigation projects.
Prior to joining Miller Legg, he was with
a local landscape architectural firm for
one year as a Landscape Designer.
Relevant Project Experience:
City of South Miami Sunset Drive
Roadway and Beautification
Improvements - For this 1/4-mile
roadway and beautification project along
Sunset Drive/SW 72nd Street from US 1
to SW 57th Avenue, Miller Legg is
providing landscape architecture,
arborist, irrigation and construction
observation services. The project scope
consists of roadway and beautification
improvements which includes proposed
type ‘F’ curb and gutters, the
replacement of sidewalks, and proposing
new trees and plants and specified
locations throughout the project site.
Specific services include tree removal
and disposition, irrigation field
investigation, hardscape design, landscape
design and construction observation
services. Miller Legg is a subconsultant
to Marlin Engineering.
City of Miami Beach 20th Street &
Sunset Drive Pocket Park - Under
our Continuing Services Contract with
the City of Miami Beach, Miller Legg was
awarded an assignment to provide
survey, civil, geotechnical, electrical,
structural engineering and landscape
architecture services for the design,
permitting and construction of a new
ADA-accessible .33-acre pocket park at
20th Street and Sunset Drive. The firm
prepared a boundary and topographic
survey, assisted with the planning of key
program elements and performed
schematic design, design development,
construction document, bidding and
construction tasks. The design
incorporates Crime Prevention Through
Environmental Design (CPTED)
principles. Arborist and irrigation design
services were also furnished for this
project.
City of Tamarac University Drive
Landscaping Improvements - Miller
Legg is providing landscape architecture,
hardscape, and irrigation design,
permitting, specific purpose survey of the
existing medians, utility coordination,
utility designation, and construction
administrative services for improvements
to the existing system of medians on
University Drive between NW 78th
Street and Southgate Blvd. in the City of
Tamarac. Certified Arborist services may
also be included for tree analysis,
removal and relocation needs.
Coordination with numerous agencies
including FDOT, SFWMD and the City
of Tamarac will also be performed. The
project has received funding from an
FDOT Grant and included creation of
MMOA (Maintenance agreements)
between the City and FDOT. Miller
Legg worked consistently with both the
City of Tamarac and FDOT to meet the
strict deadlines to receive this additional
funding.
City of Tamarac Go-Forward
Roadway Landscape Master Plan
Update - Miller Legg provided the City
of Tamarac with an update to its
citywide Roadway Landscape Master
Plan. The project consisted of creating a
go-forward landscape roadmap guide
that will be implemented for years to
come. Miller Legg conducted a citywide
tree inventory assessment, an evaluation
of existing landscape, irrigation and
hardscape conditions, an overall
assessment of the existing character of
the road corridors, and an opportunities
and constraints analysis. The overall goal
was to create a Landscape Master Plan
that provides the City with typical
conceptual landscape concepts,
recommendations, guidelines, and
implementation strategies to follow. The
Andrew Pereda, MLA
Landscape Designer (25% Availability)
Page 474.2. Qualification of Key Personnel Assigned to Engagement
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
Master Plan was unanimously adopted by
the City Commission.
City of Miami Beach 19th Street
Stormwater Pump Station &
Botanical Gardens - Miller Legg was
part of the Ric-Man Construction and
WSP team selected by the City of Miami
Beach for its Design-Build 19th Street
Stormwater Pump Station project, part
of the citywide Stormwater
improvement system. Construction of
this pump station is part of the overall
plan for the City-wide stormwater
improvement system to reduce flooding
for residents of the Washington Avenue
and Convention Center Drive
neighborhood. The existing system
consists of a collection network with no
storage or treatment capability which
discharged into the Collins Canal. The
project scope includes a stormwater
treatment system, energy dissipating
structure, seawall modifications and
connection of the trunk line to the
proposed pump station. Miller Legg's
survey services included topographic
surveying services to establish the
perimeter, show aboveground
improvements, trees, accessible storm
and sanitary structures, right of way and
easements. A survey of utility designation
markings was also provided. In addition,
the firm prepared an as-built survey of
constructed improvements on the 19th
Street pump station, the associated
parking area and the re-capping areas of
the seawall to show above ground utility,
storm system catch basins and manholes
with invert elevations, signage, and
parking stripping. Also, Miller Legg
provided tree inventory and analysis,
hardscape, landscape and irrigation
design.
City of Miami Beach Chase Avenue
and 34th Street Shared Path -
Under its continuing services agreement
with the City of Miami Beach, Miller Legg
was retained to provide surveying, civil
engineering and landscape architecture
services related to the new Chase
Avenue and 34th Street shared path and
roadway improvements project. The 10-
ft shared use path will support the use of
simultaneous pedestrian and bicycle
activity. The scope of services includes
topographic surveying, tree inventory,
disposition and permitting; irrigation,
landscape, hardscape and amenities
design, site civil design development for
clearing/demolition, signage and marking,
paving, grading, drainage and erosion
control/pollution prevention. Team
subconsultants are performing
geotechnical tasks (soil test borings and
SFWMD exfiltration tests) and electrical
engineering/site lighting. Miller Legg is
also responsible for permitting
coordination with the City and Miami-
Dade DERM, as well as bidding
assistance/contract administration and
construction phase tasks including
construction observation.
City of Miami Gardens Rolling Oaks
Regional Park - Renovations of Rolling
Oaks Regional Park include construction
of a new one-story 4,000 SF recreation
building, renovated restroom facilities,
expansion of walking trail with lighting,
distance marker, and exercise stations,
new pavilions, new parking lot,
refurbished basketball and tennis courts,
new fencing, new shaded playgrounds,
new landscaping and irrigation, addition
of horseshoe pits, sand volleyball, mini
golf and splashpad, and video system and
WIFI. Miller Legg is providing civil
engineering, landscape architecture and
surveying services for this 7-acre park as
a subconsultant to Synalovski, Romanik
and Saye Architects. The civil scope
includes design of a lift station and on-
site force main extension to service the
proposed Welcome Center. An arborist
assessment of existing trees and palms
was carried out as part of the landscape
architecture services.
City of Lauderhill Sports Park -
Miller Legg was retained by the City of
Lauderhill to provide civil engineering
design, stormwater permitting, landscape
architecture, irrigation design,
construction specifications and bidding
assistance services for proposed
amenities improvements at the 12-acre
Lauderhill Sports Park. Replacement of
the baseball field and cricket pitch
natural grass with synthetic turf and the
football scoreboard replacement tasks
have been finalized. Miller Legg has also
completed design of the playground area
wood chip surface conversion to
synthetic turf, playground shade,
modifications to portions of the fitness
trail and the addition of new fitness
stations trail and exercise equipment.
City of Homestead Biscayne-
Everglades Greenway Trail - Among
the services Miller Legg provided for this
3.2 mile, 12-foot-wide Biscayne
Everglades Greenway shared-use trail
project are landscape architectural,
engineering, surveying and environmental
services including preparation of FDOT-
approved construction documents,
design of regulatory and wayfinding signs,
pavement markings, safe pedestrian push
button crossing and necessary drainage
within the C-103 Canal right-of-way
from East Mowry Drive to SW 137th
Avenue in Homestead. The scope of
services was based upon a 2017 Florida
Shared-use Non-Motorized Trail
Agreement between the City of
Homestead and FDOT. Topographic and
SUE services were delivered. The scope
included engineering design and
permitting services for the shared-use
trail, associated drainage and roadway
pedestrian crossings. The firm also
carried out Preliminary Natural
Resource and Protected Species
Investigations and documents related to
designation of the Project by FDOT as a
Documented Categorical Exclusion.
Vizcaya Museum & Gardens Master
Plan Refinement - Miller Legg was the
landscape architect and
traffic/transportation consultant for the
Vizcaya Museum and Gardens Master
Plan refinement. The Master Plan
refinement encompassed the entire
Vizcaya property, especially the
integration of historical agrarian and
horticultural aspects of the Vizcaya
village with the guest experience at the
Vizcaya Museum and Gardens. Miller
Legg collaborated with Quinn Evans
Architects and MC Harry Architects on
this historical restoration project for
Miami-Dade County and the Vizcaya
Museum and Gardens Trust.
Page 484.2. Qualification of Key Personnel Assigned to Engagement
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
Years of Experience: 5
Years With the Firm: 4
Education:
Master of Landscape Architecture
Florida International University, 2018
Bachelor of Arts, Urban Design
Florida Atlantic University, 2014
Continuing Education:
Crime Prevention Through Environmental Design Practioner
Seminar, 2013
Green Building and Sustainable Development Course, 2013
Professional Experience:
Ms. Fuentes is a Landscape Designer and
Recreational Planner supporting the
firm's projects including those in the
public sector such as the Florida
Department of Transportation and South
Florida municipalities. Her experience
includes landscape design, parks master
planning and hardscape design.
Relevant Project Experience:
City of Miami Armbrister Park
Community Center - Esther Mae
Armbrister Park is a 4.4-acre City of
Miami Park located at 4000 Grand
Avenue, Miami, FL 33133 in the Coconut
Grove neighborhood. Park amenities
include an existing community center,
baseball and football fields, tennis and
basketball courts, playground and
exercise equipment. The project involves
replacement of the existing community
center building with a new 10,000 SF 2-
story facility and outdoor pavilion. Miller
Legg is responsible for civil, landscape
architecture and SUE services along with
boundary, topographic and tree
surveying. The firm is providing site civil
and utility infrastructure research of
utility maps, as-builts and existing site
conditions followed by preparation of
civil, landscape architecture and
irrigation construction documents,
government agency permitting
coordination, bidding assistance, contract
administration and construction
administration. Tree inventory,
disposition plans and permitting are part
of the scope provided by the firm's
certified arborists.
City of Miami E.G. Sewell Park -
Miller Legg is under contract with the
City of Miami for program development,
pre-design, master planning design
including public involvement workshops,
construction documents and
construction administration services for
Sewell Park. The program will be an
open passive park with elements
including passive walkways through park
and preserve areas, pavilions, an eco
trail, baywalk, hardscape, floating docks,
kayak launch, seawall/living shoreline,
wayfinding and historical information
signage. The scope of services includes
landscape architecture, irrigation, civil
engineering, topographical surveying,
SUE, certified arborist, structural
engineering, electrical engineering,
geotechnical engineering, archeological,
permitting, bidding assistance and limited
construction administration. Miller Legg
will also conduct a Bonneted Bat survey
and perform a bathymetric survey for
the seawall component. The firm is
assisting the City to gather community
stakeholder input during the design
process. Government agency permitting
will be coordinated with Miami-Dade
Co. DERM, WASD and SFWMD.
City of Miami Fairlawn Community
Park - Under our continuing services
contract with the City of Miami, Miller
Legg was awarded the development of
programming, pre-design/concept,
design, construction document
preparation and construction phase
services for a new park on SW 63rd
Avenue. The scope includes civil
engineering, landscape architecture,
certified arborist, surveying and SUE,
structural, electrical and geotechnical
engineering as well as permitting, opinion
of probable cost and limited
construction administration. The passive
park will contain a shaded/fenced
children's playground, dog run, shared
pedestrian / bicyclist perimeter path,
light bollards, benches, pedestrian pole
lighting, irrigation, water fountain, bike
racks, receptacles, hardscape furniture,
access driveway and perimeter privacy
walls. Permitting will be coordinated
with the City of Miami, Miami-Dade
County DERM, WASD and SFWMD.
Survey services include boundary and
topographic and tree inventory. Miller
Legg will assist the City with the
presentation of conceptual designs at
Community Meetings to gather public
input for a final design.
Liudmila Fuentes, MLA
Landscape Designer | Community Outreach (15% Availability)
Page 494.2. Qualification of Key Personnel Assigned to Engagement
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
City of Oakland Park East Dog Park
- To assist with the City of Oakland
Park's plan to develop a 1-acre Dog Park
at the existing Richard Giusti Heart Par
Cours Park, Miller Legg was retained for
topographic and tree surveying, SUE,
engineering and landscape architecture
services as well as an opinion of probable
cost. The firm is providing schematic
designs and renderings to provide off-
street parking along NE 6th Avenue and
NE 36th Street, sidewalk connectivity,
modification to the existing jogging trail,
dog park design for small and large dogs
which includes landscape improvements,
tree additions, canopy shelters, water
stations, pet waste stations, benches and
asphalt walking paths. This project is
being performed under Miller Legg's
continuing services contract.
City of Port St. Lucie US 1
Irrigation and Landscape Design -
Miller Legg is preparing for the City of
Port St. Lucie an update to the firm's
2015 irrigation and landscape design
plans for 3.5 miles of US Highway 1 from
Westmoreland Boulevard to Village
Green Drive. Services comprise
proposed concept and construction
landscape and hardscape improvement
plans including median hardscape design,
shrub, groundcover and tree plantings or
removal, irrigation design and utility
coordination. The plans will be
submitted to FDOT for approval. The
scope includes a presentation of plan
exhibits to the City Council by the firm.
City of Tamarac Commercial Blvd
Landscaping Improvements - The
City of Tamarac engaged Miller Legg to
provide landscape architectural and
survey services for the existing medians
along 1.70 miles of West Commercial
Blvd in Broward County between North
Pine Island Road and Sawgrass
Expressway. In addition to landscape
architecture, a certified arborist report
and survey (including vacuum
excavations) services, the Miller Legg
team provided lighting and electrical
services, irrigation design, permitting,
and construction administrative services.
Coordination efforts with multiple
agencies, such as the Florida Turnpike
Authority (FTE) and the South Florida
Water Management District (SFWMD),
is included in the project scope. Specific
services for these roadway
improvements entailed providing a
specific purpose survey showing only
above-ground improvements, compiling a
30% conceptual landscape and lighting
plan, and providing 100% construction
documents for irrigation, landscape,
hardscape, lighting and electrical, and an
arborist assessment.
City of Tamarac East Side Parks
Feasibility Study - The Miller Legg
team conducted a needs assessment and
feasibility study to address potential new
recreation facilities in the eastern
portion of the City of Tamarac. The
scope included comprehensive
recreation planning based on research of
existing facilities and programs,
recreation opportunities and a needs
assessment specific to the study area
demographics in order to develop
programming, budget and operational
needs for the proposed improvements.
Community input was gathered via
various survey platforms and City staff
and public workshops scheduled to
refine recreation needs and desires. The
final deliverable was a Feasibility Study
which contained a 10-year capital
improvement plan for the
implementation of the proposed
improvements and acquisitions, an
analysis of funding opportunities and a
narrative report to outline the process
and results.
City of Weston Parks & Recreation
Master Plan - In 2021, the City of
Weston selected Miller Legg to develop
a municipal parks and recreation plan
(PRMP) to incorporate
recommendations for provision of future
facilities programs and services, land
acquisition and development,
maintenance, operations and
management. A master-planned 27-
square-mile community of 68,000
residents in Broward County, Weston
currently has 242 open space and park
acres and 16 existing parks offering a
variety of recreational and athletic
amenities and activities. The Master Plan
will include components including
Department Mission Vision and
Objectives, Community Inventory and
Assessment, Needs Assessment, Level of
Service Standards, Parks and Recreation
Strategic Plan, Recreation Trends
Analysis, Recreation Programming Plan,
ADA Transition Plan, Community
Relations and Marketing Plan,
Community Health and Environmental
Responsibility Plan.
City of Tamarac University Drive
Landscaping Improvements - Miller
Legg is providing landscape architecture,
hardscape, and irrigation design,
permitting, specific purpose survey of the
existing medians, utility coordination,
utility designation, and construction
administrative services for improvements
to the existing system of medians on
University Drive between NW 78th
Street and Southgate Blvd. in the City of
Tamarac. Certified Arborist services may
also be included for tree analysis,
removal and relocation needs.
Coordination with numerous agencies
including FDOT, SFWMD and the City
of Tamarac will also be performed. The
project has received funding from an
FDOT Grant and included creation of
MMOA (Maintenance agreements)
between the City and FDOT. Miller
Legg worked consistently with both the
City of Tamarac and FDOT to meet the
strict deadlines to receive this additional
funding.
Greater Boca Raton Beach and
Parks District Ocean Breeze
Master Plan - Miller Legg was retained
by the Greater Boca Raton Beach and
Parks District (GBRBPD) to prepare a
Master Plan for Ocean Breeze Park, site
of the former Boca Teeca Country Club
and Golf Course. The Master Plan will
reflect the District's desire to provide a
diverse recreational amenity at this 212-
acre property for City residents while
considering the specific desires and
concerns of the adjacent residential
communities. The Plan will address
Ocean Breeze's future facilities, uses,
programs, operation, maintenance and
funding and recommend Park
modifications, improvements,
enhancements and additional uses.
Recreational elements may include
passive park facilities (trails, walking
paths, open fields/areas), golf
course/facilities, active park uses
(playgrounds, tennis courts, sport courts,
aquatics), community center/facilities and
potential revenue-generating
opportunities.
Page 504.2. Qualification of Key Personnel Assigned to Engagement
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
Years of Experience: 16
Years With the Firm: 16
Registrations & Certifications:
FDOT Intermediate Maintenance of Traffic, FL, 2013
Education:
Bachelor of Landscape Architecture
University of Florida, 2006
Continuing Education:
FDOT Specifications Package Preparation Training, 2017
Professional & Civic Activities:
Member, Alpha Rho Chi, National Professional Honor Society
Associate Member, American Society of Landscape Architects
Professional Experience:
Mr. Perez is a Landscape Designer
responsible for landscape architectural
design for a variety of public and private
projects including roadway landscaping
and irrigation, active and passive park
landscape design, as well as residential
and commercial projects.
Relevant Project Experience:
City of Sunny Isles Beach Pelican
Community Park - A three-acre active
park site, for which Miller Legg managed
landscape architecture, irrigation,
engineering, surveying and architecture
designs for a baseball field, recreation
building, playground structure,
gymnasium, and related site amenities
within the City of Sunny Isles Beach.
The project management team at Miller
Legg received recognition from the City
for their involvement in the design
completion of the park. In addition,
Miller Legg provided construction
observation services. In addition, we
also provided grant assistance to secure
a Florida Recreational Development
Assistant Program (FRDAP) grant for
$200,000. FRDAP is a competitive grant
program that provides financial
assistance to local governments for
development or acquisition of land for
public outdoor recreational purposes.
Award: Award of Merit, American Society of
Landscape Architects, Florida Chapter, 2009
City of Miami Buena Vista Heights
Landscape – Miller Legg prepared
landscape architecture design plans for
the City of Miami Buena Vista Heights
neighborhood. The neighborhood
roadway improvements project area
included tree removal/mitigation and
landscape design. Miller Legg was a
subconsultant to RJ Behar and Company.
City of Miramar Miramar Parkway
Redevelopment - This redevelopment
and streetscape project included a two-
mile, two-block urban section of the
Miramar Parkway corridor adjacent to
SR 7/US 441. Miller Legg designed the
landscape and irrigation improvements
for Florida Department of
Transportation (FDOT) along this
corridor north and south of Miramar
Parkway. In addition, certified arborist
services were provided for a tree
inventory and quality evaluation. The
proposed streetscape improvements
included enhancement of the pedestrian
corridor to encourage safe pedestrian
traffic for adjacent commercial and office
uses. The design also called for
consolidated parking areas rather than
replacing backout parking in front of
businesses for the safety of both the
pedestrian and automobile traffic and to
improve the street operation and the
aesthetics of the streetscape.
City of Pembroke Pines D/B Taft
Street Improvements - Miller Legg
was on the RJ Behar team for this Taft
Street Design Build project for the City
of Pembroke Pines. The firm's scope of
services was landscape architectural
design and post design services and
included the development of design and
contract documents including plans and
specifications. Support during the
construction phase with Requests for
Information and contractor submittals
was also provided.
City of Pembroke Pines
Streetscape Design Guidelines -
Miller Legg worked on the City of
Pembroke Pines City Wide Streetscape
Master Plan which included the creation
of context sensitive design guidelines for
the roadway corridors throughout the
City including accommodations for
mobility. This Master Plan looked at both
the corridor segment and intersection
component. Corridor segment
components included: median plantings,
‘Side of Road’ (along the right-of-way or
street edge) plantings, street trees and
specialty plantings. Intersection segment
components included: Median nose
treatments, crosswalks, expanded
pedestrian plazas at the corners,
specialty items and icons. Components
Nelson Perez
Landscape Designer (15% Availability)
Page 514.2. Qualification of Key Personnel Assigned to Engagement
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
also included some specialty ‘Threshold’
Plantings, if there was adequate space.
Residential streets included ‘Family
Ways’. These streets are intra-
neighborhood linkages with
improvements designed to enhance
alternative modes of transportation –
such as walking and biking. The Family
Ways more effectively links residential
communities with schools and parks and
with commercial nodes, too, for
shopping and to promote commerce at a
local level.
City of Lauderdale Lakes C-13
Western Greenway LAP - This
project is generally described as the
design of an FDOT LAP-funded one-mile
greenway along the southern C-13 canal
bank from SR 7 to the Florida Turnpike.
The Project is part of the overall
Greenway Trail System for Broward
County including two municipalities; the
larger portion of which is in the City of
Lauderdale Lakes, the remaining portion
of which, is in the City of Oakland Park.
The Greenway connects to a pedestrian
bridge linking the proposed Greenway to
an existing City Park, City Hall and the
Park Lakes Elementary School. Services
provided include landscape architecture,
surveying, environmental permitting,
NEPA documentation, SFWMD Canal
ROW permitting, and engineering
services.
City of Coconut Creek Copans
Road Median Landscape
Architecture Plans - For this median
improvement project along Copans Road
between Lyons Road and the Florida
Turnpike Overpass, Miller Legg provided
landscape, hardscape and irrigation
design plans, tree inventory, surveying,
permitting, pre-construction and
construction observation services to the
City. Tree, streets and highway
permitting was coordinated with
Broward County.
City of Miramar - Miramar Parkway
LAP Streetscape Improvements
from 62nd to 64th Avenue - Miramar
Parkway Streetscape Improvement
project was a Local Agency Program
(LAP)-funded revitalization project in the
City of Miramar. The project entailed
Miramar Parkway's eastern gateway
segment from 62nd to 64th Avenue,
approximately 1/2 mile in length. The
project included intersection
improvements, traffic signal
modifications/upgrades and sidewalk and
Florida Friendly landscape beautification
throughout the project limits. Services
provided included: surveying including
topographic surveying, maintenance of
traffic, underground utility designation,
landscape architecture, hardscape design,
drainage and stormwater permitting,
design and management, lighting and
electrical design, geotechnical design,
traffic engineering, tree permitting and
arborist services, as well as LAP
coordination, permitting and submittal
documentation. Miller Legg developed a
master plan for this corridor,
incorporating access management and
shared commercial parking facilities to
enhance the commercial viability of the
corridor. Utilizing the master plan,
extensive public outreach was conducted
with the corridor stakeholder to
establish consensus on the
redevelopment and roadway plan.
City of Wilton Manors Public
Complex - The objective of this project
was to develop a sustainable design
through the use of Best Management
Practices, (BMP's) incorporating
xeriscaping principles for irrigation and
landscaping, including the careful
selection of native and adaptive plant
species which are hardy and adaptive to
the South Florida sub-region, require
minimal maintenance after initial plant
establishment, avoid monoculture
planting and would also thrive in the
locations chosen and not require
irrigation in the majority of the
landscaped areas after the first year of
plant establishment. Groundcover,
instead of sod, was also incorporated to
further achieve the long term goal of a
sustainable environment, with regards to
chemical uses and provides for an overall
less intensive landscape for continued
maintenance. Working closely with the
Project Architect, the design team
included the City's newly adopted
Streetscape Design Guidelines and
implemented a harmonious placement of
plants to complement the building’s
architectural features. Special focus was
also given to incorporate shading for the
City Hall Complex Building and in
pedestrianized areas to reduce heat
island effects and increase the energy
efficiency of the future home for the City
of Wilton Manors. Services provided for
this project include development of
conceptual and final landscape
architecture plans, color renderings and
construction phase services.
Palm Beach Gardens Tennis Center
- The City of Palm Beach Gardens
planned for a new clubhouse at its
Tennis Center, a premier community
public 18-court tennis facility and
recipient of a 2014 US Tennis
Association National Outstanding Facility
Award. As part of the OLC architecture
team, Miller Legg provided civil and
landscape architecture design services
for the new 12,000 SF building. Miller
Legg's scope of services included
schematic design, design development,
construction document preparation and
construction observation phases.
Permitting was coordinated through the
South Florida Water Management
Division, Palm Beach Gardens Fire,
Health and Public Works Departments
as well as Seacoast Utility Authority.
City of Tamarac University Drive
Landscaping Improvements - Miller
Legg is providing landscape architecture,
hardscape, and irrigation design,
permitting, specific purpose survey of the
existing medians, utility coordination,
utility designation, and construction
administrative services for improvements
to the existing system of medians on
University Drive between NW 78th
Street and Southgate Blvd. in the City of
Tamarac. Certified Arborist services may
also be included for tree analysis,
removal and relocation needs.
Coordination with numerous agencies
including FDOT, SFWMD and the City
of Tamarac will also be performed. The
project has received funding from an
FDOT Grant and included creation of
MMOA (Maintenance agreements)
between the City and FDOT. Miller
Legg worked consistently with both the
City of Tamarac and FDOT to meet the
strict deadlines to receive this additional
funding.
Page 524.2. Qualification of Key Personnel Assigned to Engagement
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
Years of Experience: 4
Years With the Firm: 3
Education:
Master of Landscape Architecture
Florida International University, 2019
Bachelor of Arts, Religion, Minor in Education
Florida State University, 2014
Professional Experience:
Mr. Bradley is a Landscape Designer
supporting the firm's projects including
those in the public sector such as
municipal parks and recreation master
plans, park landscape, hardscape and
irrigation design, educational facilities as
well as streetscape for the Florida
Department of Transportation.
Relevant Project Experience:
City of Miami Fairlawn Community
Park - Under our continuing services
contract with the City of Miami, Miller
Legg was awarded the development of
programming, pre-design/concept,
design, construction document
preparation and construction phase
services for a new park on SW 63rd
Avenue. The scope includes civil
engineering, landscape architecture,
certified arborist, surveying and SUE,
structural, electrical and geotechnical
engineering as well as permitting, opinion
of probable cost and limited
construction administration. The passive
park will contain a shaded/fenced
children's playground, dog run, shared
pedestrian / bicyclist perimeter path,
light bollards, benches, pedestrian pole
lighting, irrigation, water fountain, bike
racks, receptacles, hardscape furniture,
access driveway and perimeter privacy
walls. Permitting will be coordinated
with the City of Miami, Miami-Dade
County DERM, WASD and SFWMD.
Survey services include boundary and
topographic and tree inventory. Miller
Legg will assist the City with the
presentation of conceptual designs at
Community Meetings to gather public
input for a final design.
City of Miramar Historic Public
Safety Complex - The City of Miramar
replaced the Civic Center and Child
Care building with a new one-story
24,000 SF building to accommodate its
police substation, storage, administrative
and other law enforcement and public
safety facilities, in addition to a surface
parking lot for safety vehicles. The new
building was certified Gold LEED
certification. Miller Legg provided civil
engineering design, permitting and
construction administration services as
part of the Architects Design Group
team. Government permitting included
the City of Miramar, Broward County
and FDEP. The firm also provided LEED
certification and value engineering review
services.
City of Plantation Parks &
Recreation Master Plan - Miller Legg
was selected to prepare the first
Plantation Parks and Recreation Master
Plan. The firm provided comprehensive
recreation planning to create the Master
Plan. The Parks and Recreation Master
Plan is a tool intended to help the City of
Plantation meet the current and future
recreation needs of the community. The
resident-driven plan serves as a source
of applicable decision-making
information, and establishes clear goals
and actionable objectives to guide staff,
advisory committees, and City Council in
their work to maintain and enhance
Plantation’s system of parks, recreation
facilities, and programs over the next ten
years. The Plan was based upon research
of existing facilities and programs,
recreation opportunities and needs
analyses specific to City of Plantation
demographics. To effectively gather and
disseminate information during the
planning phase, Public Outreach was an
important focus of the project. Public
workshops and Public Online Survey
assisted in determining community
recreation needs and desires. All 42
Parks and 5 Community Centers sites
were reviewed, along with future
expansion opportunities to
accommodate program requirements. In
addition, Miller Legg assisted the City to
achieve its prestigious national CAPRA
(Commission for Accreditation of Park
and Recreation Agencies) accreditation,
a demonstrated management system of
best practices and measure of agency
quality of operation, management and
service to the community.
Michael Bradley, MLA
Landscape Designer (15% Availability)
Page 534.2. Qualification of Key Personnel Assigned to Engagement
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
City of Tamarac Commercial Blvd
Landscaping Improvements - The
City of Tamarac engaged Miller Legg to
provide landscape architectural and
survey services for the existing medians
along 1.70 miles of West Commercial
Blvd in Broward County between North
Pine Island Road and Sawgrass
Expressway. In addition to landscape
architecture, a certified arborist report
and survey (including vacuum
excavations) services, the Miller Legg
team provided lighting and electrical
services, irrigation design, permitting,
and construction administrative services.
Coordination efforts with multiple
agencies, such as the Florida Turnpike
Authority (FTE) and the South Florida
Water Management District (SFWMD),
is included in the project scope. Specific
services for these roadway
improvements entailed providing a
specific purpose survey showing only
above-ground improvements, compiling a
30% conceptual landscape and lighting
plan, and providing 100% construction
documents for irrigation, landscape,
hardscape, lighting and electrical, and an
arborist assessment.
City of Tamarac East Side Parks
Feasibility Study - The Miller Legg
team conducted a needs assessment and
feasibility study to address potential new
recreation facilities in the eastern
portion of the City of Tamarac. The
scope included comprehensive
recreation planning based on research of
existing facilities and programs,
recreation opportunities and a needs
assessment specific to the study area
demographics in order to develop
programming, budget and operational
needs for the proposed improvements.
Community input was gathered via
various survey platforms and City staff
and public workshops scheduled to
refine recreation needs and desires. The
final deliverable was a Feasibility Study
which contained a 10-year capital
improvement plan for the
implementation of the proposed
improvements and acquisitions, an
analysis of funding opportunities and a
narrative report to outline the process
and results.
City of Tamarac University Drive
Landscaping Improvements - Miller
Legg is providing landscape architecture,
hardscape, and irrigation design,
permitting, specific purpose survey of the
existing medians, utility coordination,
utility designation, and construction
administrative services for improvements
to the existing system of medians on
University Drive between NW 78th
Street and Southgate Blvd. in the City of
Tamarac. Certified Arborist services may
also be included for tree analysis,
removal and relocation needs.
Coordination with numerous agencies
including FDOT, SFWMD and the City
of Tamarac will also be performed. The
project has received funding from an
FDOT Grant and included creation of
MMOA (Maintenance agreements)
between the City and FDOT. Miller
Legg worked consistently with both the
City of Tamarac and FDOT to meet the
strict deadlines to receive this additional
funding.
City of Fort Lauderdale Las Olas
Streetscape Design - As a
subconsultant to The Corradino Group,
Miller Legg has provided various
landscape architecture services for the
Las Olas Streetscape Project. The
project spans eastward from Andrews
Ave. and cuts through four (4) distinct
districts along Las Olas Boulevard
including Downtown Las Olas, The
Historic Shops, Colee Hammock, and
The Isles. Each area has been designed
to retain its individual identity, while
simultaneously being part of a cohesive
thoroughfare design between Downtown
Fort Lauderdale and The Beach. Miller
Legg was responsible for the planting
design along the corridor which was
entirely composed of native and Florida
Friendly species to create a pedestrian
friendly environment accenting each area
along Las Olas Boulevard. Miller Legg
also provided placemaking and
programming services, for which the
designers created parklets, plazas, and
iconic hardscape elements with water
features and public art installations that
work as resting places and wayfinding
spots. These systems incorporate such
slogans as “Meet me at Las Olas”
“Colee Hammock” and “The Isles” in the
hardscape to promote wayfinding and
create an “Instagram-able” moment.
Overhead shade structures were also
designed to help with wayfinding through
decorative elements subtly depicting the
initials corresponding to each area (eg.
“HSLO” for Historic Shops Las Olas).
Miller Legg's scope included
programming the pedestrian areas along
the corridor which integrated hardscape
design, seating design, and open space
utilization. The firm assisted with
multiple public outreach efforts including
meetings with homeowner association
groups. Miller Legg surveyors used 3D
laser scanning equipment to collect and
process LiDAR data in preparation for
project conceptual design data needs.”
City of Homestead Biscayne
Everglades Trail Western
Expansion Feasibility Study - Miller
Legg was retained to conduct a feasibility
study to assist the City of Homestead in
determining the preferred route and trail
design for the alignment of the Western
Extension of the existing Biscayne
Everglades Greenway Trail (BEGT). The
Study Area is from the C-103 Canal
Crossing at East Mowry Drive to the
192nd Ave. intersection with West
Mowry Drive. Miller Legg's scope
comprises compilation of an existing
conditions inventory, preparation of a
matrix of criteria to use in the evaluation
of the potential trail alignments,
preparation of various preliminary
alignment alternatives with Opinions of
Probable Cost, development of a
preferred alignment with location, typical
design, proposed enhancements, right of
way/property issues associated with
implementation, followed by creation of
the Feasibility Report for presentation to
the City Council.
City of Hallandale Beach Atlantic
Shores Boulevard from US-1 /
Federal Highway to Diplomat
Parkway - This 1/4-mile milling and
resurfacing project included
enhancements along Atlantic Shores
Boulevard between US 1 and Diplomat
Parkway in the City of Hallandale Beach.
Enhancements included drainage, signage
and pavement markings, signalization,
lighting, landscaping and hardscape.
Specific landscape architecture analysis
and design services included landscape
architecture and irrigation plans for the
median islands, swales, parking
islands/bulbouts, hardscape and a
roundabout.
Page 544.2. Qualification of Key Personnel Assigned to Engagement
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
Years of Experience: 2
Years With the Firm: 2
Education:
Bachelor of Landscape Architecture, Landscape Architecture
University of Florida, 2022
Professional Experience:
Mr. Randall is a Landscape Designer
responsible for landscape architectural
design for a variety of public projects
including roadway landscaping and
irrigation, and active and passive park
landscape design.
Relevant Project Experience:
City of Miami E.G. Sewell Park -
Miller Legg is under contract with the
City of Miami for program development,
pre-design, master planning design
including public involvement workshops,
construction documents and
construction administration services for
Sewell Park. The program will be an
open passive park with elements
including passive walkways through park
and preserve areas, pavilions, an eco
trail, baywalk, hardscape, floating docks,
kayak launch, seawall/living shoreline,
wayfinding and historical information
signage. The scope of services includes
landscape architecture, irrigation, civil
engineering, topographical surveying,
SUE, certified arborist, structural
engineering, electrical engineering,
geotechnical engineering, archeological,
permitting, bidding assistance and limited
construction administration. Miller Legg
will also conduct a Bonneted Bat survey
and perform a bathymetric survey for
the seawall component. The firm is
assisting the City to gather community
stakeholder input during the design
process. Government agency permitting
will be coordinated with Miami-Dade
Co. DERM, WASD and SFWMD.
Miami-Dade County Parks,
Recreation & Open Space (PROS)
Greynolds Park Playground Design
– Miller Legg was retained to provide
survey, civil engineering, and landscape
architecture services at Greynolds Park
in North Miami Beach. The East
Greynolds Design Program includes the
addition of an ADA compliant sidewalk
connecting the existing parking area to
the existing shelter. The West
Greynolds Park Design Program includes
the demolition of the existing playground
and the construction of a new
playground that meets nature play
criteria set forth by Miami-Dade County
PROS. Educational and historic signage
will be designed and added to the
playground area. Miller Legg has also
provided topographic and tree surveying
and SUE services for this property.
City of Fort Lauderdale Las Olas
Streetscape Design - As a
subconsultant to The Corradino Group,
Miller Legg has provided various
landscape architecture services for the
Las Olas Streetscape Project. The
project spans eastward from Andrews
Ave. and cuts through four (4) distinct
districts along Las Olas Boulevard
including Downtown Las Olas, The
Historic Shops, Colee Hammock, and
The Isles. Each area has been designed
to retain its individual identity, while
simultaneously being part of a cohesive
thoroughfare design between Downtown
Fort Lauderdale and The Beach. Miller
Legg was responsible for the planting
design along the corridor which was
entirely composed of native and Florida
Friendly species to create a pedestrian
friendly environment accenting each area
along Las Olas Boulevard. Miller Legg
also provided placemaking and
programming services, for which the
designers created parklets, plazas, and
iconic hardscape elements with water
features and public art installations that
work as resting places and wayfinding
spots. These systems incorporate such
slogans as “Meet me at Las Olas”
“Colee Hammock” and “The Isles” in the
hardscape to promote wayfinding and
create an “Instagram-able” moment.
Overhead shade structures were also
designed to help with wayfinding through
decorative elements subtly depicting the
initials corresponding to each area (eg.
“HSLO” for Historic Shops Las Olas).
Miller Legg's scope included
programming the pedestrian areas along
the corridor which integrated hardscape
design, seating design, and open space
Jarred Randall
Landscape Designer (50% Availability)
Page 554.2. Qualification of Key Personnel Assigned to Engagement
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
utilization. The firm assisted with
multiple public outreach efforts including
meetings with homeowner association
groups. Miller Legg surveyors used 3D
laser scanning equipment to collect and
process LiDAR data in preparation for
project conceptual design data needs.”
City of Tamarac Commercial Blvd
Landscaping Improvements - The
City of Tamarac engaged Miller Legg to
provide landscape architectural and
survey services for the existing medians
along 1.70 miles of West Commercial
Blvd in Broward County between North
Pine Island Road and Sawgrass
Expressway. In addition to landscape
architecture, a certified arborist report
and survey (including vacuum
excavations) services, the Miller Legg
team provided lighting and electrical
services, irrigation design, permitting,
and construction administrative services.
Coordination efforts with multiple
agencies, such as the Florida Turnpike
Authority (FTE) and the South Florida
Water Management District (SFWMD),
is included in the project scope. Specific
services for these roadway
improvements entailed providing a
specific purpose survey showing only
above-ground improvements, compiling a
30% conceptual landscape and lighting
plan, and providing 100% construction
documents for irrigation, landscape,
hardscape, lighting and electrical, and an
arborist assessment.
Town of Davie Governor Leroy
Collins Farm Park – The new
Governor Leroy Collins Farm Park 80-
acre parcel was purchased in 2008
through a combination of funds from
Davie District 4 open space bonds,
Broward County, the Farm Bureau and
the Florida Communities Trust Fund.
The first phase of the park will consist of
20-acres of development and will include
an educational center, riding arena,
stables, farmers market and playground.
Located east of I-75, the park is being
built to preserve the rural lifestyle of the
Town of Davie. Miller Legg is providing
civil engineering, surveying, landscape
architecture, and environmental services
as part of the MC Harry team. The park
will provide volunteer opportunities,
farm tours, field trips, summer camps,
community gardens, and equestrian
programs for the special needs
population. Miller Legg's civil
engineering scope includes earthwork
analysis; paving, grading and drainage;
water and sanitary sewer, pavement
marking and signage, stormwater
pollution prevention; offsite
improvements; phasing plans, permitting
through the Town of Davie, Central
Broward Water Control District, City of
Sunrise, Florida Department of
Environmental Protection, Broward
County Environmental Protections and
South Florida Water Management
District; and construction administration.
The wetlands scope includes wetlands
due diligence, and the landscape
architecture scope includes planting
design, irrigation design and pedestrian
and equestrian trails. Surveying services
consisted of a topographic and tree
survey.
Veterans Administration (VA)
Florida National Cemetery Ph5
Design Build - Miller Legg was retained
to provide surveying, civil engineering,
landscape architecture and
environmental services for the Florida
National Cemetery Phase 5 Design Build
Project located in Bushnell, FL. The
project comprises the next and final
construction phase of cemetery
development and primarily includes
master planning design and construction
involving the development of
approximately 40 acres of undeveloped
land to accommodate approximately
50,350 gravesites, including both casket
and cremation sites in new burial
sections. The scope of work also
includes topographic survey, agency
permitting, environmental compliance
review, threatened and endangered
species review, addressing corrections
and repairs and evaluating existing
structures and landscaping/irrigation for
sustainability. Miller Legg is a
subconsultant to The LA Group.
United States Department of
Veterans Affairs South Florida
National Cemetery Phase 2 Design-
Build - Miller Legg is providing civil,
survey, landscape architecture, irrigation
design and environmental services for
Phase 2 of this Design Build project
located in Lake Worth. Survey services
consist of boundary and topographic
surveys and surveyor title review.
Environmental tasks include wetland
mitigation assistance and threatened and
endangered species coordination in
addition to annual mitigation monitoring
over 5 years and gopher tortoise survey,
permitting and relocation. The firm is
providing landscape and irrigation design
development, construction and record
drawing documents. Civil construction
document preparation including signing
and pavement marking, pre-construction
and construction period services are also
being provided. Miller Legg was the
prime consultant for the master planning,
design, and construction for the
development of the 313-acre national
cemetery in Palm Beach County.
Orlando VA Healthcare System
(VA) Medical Center Facility
Master Plan - Miller Legg is providing
irrigation and landscape architecture
services for the Orlando Veterans
Administration (VA) Medical Center
Facility Master Plan project, which
consists of four (4) sites: Lake Nona VA
Medical Center, Lake Baldwin VA
Outpatient Clinic, Lakemont Campus VA
Medical Center and Viera Outpatient
Clinic. The firm is responsible for the
evaluation and review of existing
conditions, and development of design
recommendations, including Opinion of
Probable Costs. Environmental concerns
and methods will be identified to make
each campus "greener" by using
sustainable irrigation and landscape
principles. Miller Legg will prepare a
Comprehensive Irrigation Facility Master
Plan taking account of future campus
projects, and will assist with a review of
the 100% landscape plan.
Miami-Dade County Water and
Sewer Department (WASD) Pump
Station 0491 Force Main Extension
Survey - Miller Legg was contracted by
300 Engineering Group to provide route
surveys of approximately 5500 linear
feet of portions of Collins Avenue and
Golden Beach Drive for the purpose of
designing new force mains along this
route. The firm's scanning technology
was successfully used to produce this
survey. An extension to the north was
requested by 300 Engineering Group.
The ultimate Client for this project was
WASD.
Page 564.2. Qualification of Key Personnel Assigned to Engagement
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
Years of Experience: 14
Years With the Firm: 9
Registrations & Certifications:
FDEP Stormwater, Erosion & Sedimentation Inspector, FL,
2011
Professional Wetland Scientist, 2021
ISA Intro to Urban Forestry, 2020
FDOT Intermediate Maintenance of Traffic, FL, 2016
Certified Landscape Inspector, FL, 2014
Advanced Airport Wildlife Hazard Management, FL, 2014
Certified Arborist, 2014
Broward County Basic Tree Pruning, FL, 2012
SFWMD Certified Airboat Pilot
Education:
Bachelor of Science, Ecology & Biology, Minor in Geography
Florida Atlantic University, 2008
Certificate, Environmental Studies
Florida Atlantic University, 2005
Continuing Education:
FDOT LAP Certification Webinar, 2015
NRA First Steps Shotgun Orientation
Publications & Presentations:
FAU, Carnivorous Plants, 2010, Co-Presenter
FAU, Suwannee River Basin, 2007
SFWMD, Everglades Tree Island Health, 2011, Co-Presenter
Professional & Civic Activities:
Past Member, City of Plantation Landscape Planning &
Review Board
Member, Florida Urban Forestry Council (FUFC)
Member, International Society of Arboriculture
Member, Landscape Inspectors Association of Florida (LIAF)
Past Member, Native Plant Society, Broward County Chapter
Member, South Florida Association of Environmental
Professionals (SFAEP)
Professional Experience:
Mr. Mohler is a Certified Arborist and
Certified Landscape Inspector providing
a variety of services to both public and
private sector clients, including: tree
species identification and inventories,
tree surveys and canopy mapping,
destroyed/damaged tree assessments,
tree value estimates, tree grading, tree
species selection for planting, mangrove
trimming oversight and tree permitting.
Relevant Project Experience:
City of Miami Beach South Beach
Tree and Dune Inventory - Miller
Legg and its Certified Arborists
conducted a comprehensive tree and
dune vegetation inventory on a section
of South Beach east of the pedestrian
walk from 3rd to 5th Streets. All 300
tree species found within the area were
inventoried as point locations with
associated attributes and all dominant
shrub and ground cover species were
collected as polygon data with associated
percent coverage and species data. The
information was then displayed on a
digital map and the data was provided to
the client in .shp file format. Miller Legg
was a subconsultant to Coastal Systems
International.
City of Miami E.G. Sewell Park -
Miller Legg is under contract with the
City of Miami for program development,
pre-design, master planning design
including public involvement workshops,
construction documents and
construction administration services for
Sewell Park. The program will be an
open passive park with elements
including passive walkways through park
and preserve areas, pavilions, an eco
trail, baywalk, hardscape, floating docks,
kayak launch, seawall/living shoreline,
wayfinding and historical information
signage. The scope of services includes
landscape architecture, irrigation, civil
engineering, topographical surveying,
SUE, certified arborist, structural
engineering, electrical engineering,
geotechnical engineering, archeological,
permitting, bidding assistance and limited
construction administration. Miller Legg
will also conduct a Bonneted Bat survey
and perform a bathymetric survey for
the seawall component. The firm is
assisting the City to gather community
stakeholder input during the design
process. Government agency permitting
will be coordinated with Miami-Dade
Co. DERM, WASD and SFWMD.
City of Miami La Pastorita
Neighborhood Roadway
Improvements Study - This
neighborhood improvement project is
located in the La Pastorita neighborhood,
bounded by SW 11th Street to the
north, SW 16th Street to the south, SW
34th Avenue to the east and SW 37th
Avenue to the west. The goal of the
project is to promote pedestrian friendly
roadways and neighborhood
beautification. Miller Legg is providing
landscape architecture and Certified
Arborist services. Specific services
include tree inventory and assessment,
tree master plan coordination,
conceptual plan / color rendering for the
La Pastorita Neighborhood Roadway
Improvements Phase 1. Other activities
include public outreach and future
construction program analysis. Miller
Legg is a subconsultant to The
Corradino Group.
City of Tamarac Commercial Blvd
Landscaping Improvements - The
City of Tamarac engaged Miller Legg to
provide landscape architectural and
survey services for the existing medians
along 1.70 miles of West Commercial
Blvd in Broward County between North
Pine Island Road and Sawgrass
Expressway. In addition to landscape
architecture, a certified arborist report
and survey (including vacuum
excavations) services, the Miller Legg
team provided lighting and electrical
services, irrigation design, permitting,
and construction administrative services.
Coordination efforts with multiple
agencies, such as the Florida Turnpike
William Mohler, CA, TRAQ, PWS, CLI
Certified Landscape Inspector | Arborist (5% Availability)
Page 574.2. Qualification of Key Personnel Assigned to Engagement
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
Authority (FTE) and the South Florida
Water Management District (SFWMD),
is included in the project scope. Specific
services for these roadway
improvements entailed providing a
specific purpose survey showing only
above-ground improvements, compiling a
30% conceptual landscape and lighting
plan, and providing 100% construction
documents for irrigation, landscape,
hardscape, lighting and electrical, and an
arborist assessment.
City of Fort Lauderdale Executive
Airport (FXE) Parcels B, C & D
Environmental Services - As a result
of our Environmental Continuing
Services contract with the City of Fort
Lauderdale, Miller Legg is familiar with
airport property that contains related
office space which is leased and operated
by private developments. While the
airfield is the key to the operations, the
drainage analysis and regulatory agencies
will review the larger ownership of Fort
Lauderdale Executive Airport (FXE) for
compliance and analysis. Miller Legg has
been actively involved in the review of
the undeveloped but permitted sites for
Parcels B, C, and D. The knowledge of
these sites is important to understand
that the existing undeveloped conditions
differ from what has been designed and
permitted. Furthermore, our
involvement in review of the permits and
subsequent proposals to potentially
modify or alter the permits, allows us to
know how the drainage characteristics
may be affected. We also actively
monitor pending rule changes from
federal and state agencies, relating to
water quality treatment, that could affect
or modify future development plans as
the drainage or treatment requirements
will be changing. Miller Legg has worked
closely with FXE Airport Management
on the review and development order
conditions and permit restrictions
associated with these undeveloped and
permitted parcels. In addition, our
Certified Arborists have performed tree
inventories.
John Knox Village Campus Wide
Tree Inventory - Miller Legg was
selected by John Knox Village to perform
arborist services and a tree inventory for
the Pompano Beach campus. The tree
inventory and evaluation reflected the
following data to meet the requirements
for City of Pompano Beach: tree species;
common and scientific names; dbh
(diameter at breast height) for dicot
trees; clear trunk, grey wood, or overall
heights for palms; canopy spread, and
general health/ condition/ hazard
determination as evaluated by an ISA
Certified Arborist. Locations of trees
were recorded using a sub meter
differential global positioning satellite
(dGPS).
City of Homestead Biscayne-
Everglades Greenway Trail - Among
the services Miller Legg provided for this
3.2 mile, 12-foot-wide Biscayne
Everglades Greenway shared-use trail
project are landscape architectural,
engineering, surveying and environmental
services including preparation of FDOT-
approved construction documents,
design of regulatory and wayfinding signs,
pavement markings, safe pedestrian push
button crossing and necessary drainage
within the C-103 Canal right-of-way
from East Mowry Drive to SW 137th
Avenue in Homestead. The scope of
services was based upon a 2017 Florida
Shared-use Non-Motorized Trail
Agreement between the City of
Homestead and FDOT. Topographic and
SUE services were delivered. The scope
included engineering design and
permitting services for the shared-use
trail, associated drainage and roadway
pedestrian crossings. The firm also
carried out Preliminary Natural
Resource and Protected Species
Investigations and documents related to
designation of the Project by FDOT as a
Documented Categorical Exclusion.
Lake County ISA Arborist Services
- Miller Legg has been retained by Lake
County since 2016 as its International
Arborist Association (ISA) Certified
Arborist consultant to provide services
including inspections of areas to identify
potential hazards within the County's
right-of-way, evaluation of condition of
specific trees, training to Lake County
staff on topics such as ISA pruning
standards, diseased trees, industry
standards updates, and expert testimony
on behalf of the County during litigation
or claims processes. Tree inventory
includes DBH data collection, canopy
spread and GPS location. The firm is
required to be available for consultation
24 hours a day, 7 days a week and may
be required to perform relevant
emergency arborist services. As part of
our Lake County Arborist Contract
Miller Legg held training sessions for
Public Works staff on proper tree
trimming, utilization of and adherence to
ANSI A300 pruning standards as well as
health and disease observation
techniques. Staff were informed that
proper pruning is based on scientific
principles of plant physiology. Further,
the importance of proper tree trimming
was discussed, in particular with regard
to the very old large Laurel Oak trees
commonly found in Lake County, to
remove damaged, dead or structurally
weak limbs. This concept was
emphasized relative to improving a tree’s
health and reducing the chances of
damage to people or property caused by
falling limbs. Lake County Arborist
Projects have included the following:
1250 Gray Court, Washington Road,
Lake County Administration Building,
Max Hooks Road, and N. Sinclair Avenue
and Sylvan Shores.
Miami Beach South Beach
Boardwalk Dune & Tree Survey
and GIS Mapping - Miller Legg
updated its previous +/- 1100 LF
topographic and Coastal Construction
Control Line (CCCL) survey for a FDEP
Coastal Construction permit. This was
part of the beach boardwalk
improvements design project between
Lummus Park and South Point Drive in
South Beach. The topography included
trees and all above ground
improvements. Beach transects were
established to the Mean Water Line and
CCCL and Erosion Control Lines were
also established. The dune vegetation
survey included herbaceous, shrub and
tree species. Vegetation data was
collected using a sub-meter Trimble GPS
unit. Maps were then created in a GIS
program indicating dominant species
coverage with related percentages. In
addition a tree inventory for coastal tree
species and associated attributes was
conducted by our Certified Arborists
and displayed on digital maps.
Page 584.2. Qualification of Key Personnel Assigned to Engagement
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
Years of Experience: 12
Years With the Firm: 8
Registrations & Certifications:
FDEP Qualified Stormwater Management Inspector, 2016
Registered Burrowing Owl Agent, FL, 2022
Certified Arborist, FL, 2021
Certificate of Personal Watercraft Operation, 2005
FDOT Intermediate Maintenance of Traffic, FL, 2022
US Sailing Level 1 Sailing Instructor, 2006
NSU OC Vessel Operator Certified, 2010
PADI Advanced Open Water Certification, 2011
Education:
Bachelor of Science, Biology
Fairfield University, 2008
Master of Science, Marine Biology
Nova Southeastern University, 2013
Professional & Civic Activities:
Member, American Fisheries Society Florida Chapter
Member, Florida Association of Environmental Professionals,
S. Florida Chapter
Professional Member, ISA Florida Chapter
Member, NSU Oceanographic Center Fisheries Laboratory
Member, Pacific Island Regional Observer Program Pelagic
Observer
Member, Pelagic Observer Program
Member, Surfrider Foundation Suncoast Chapter
Member, The Wildlife Society Florida Chapter
Professional Experience:
Mr. Dancho is an Environmental
Specialist and Certified Arborist
responsible for performing investigations
on biological and ecological impacts as
well as tree surveys affecting the firm’s
public and private sector projects.
Specific responsibilities include: wetland
determinations and delineations, wetland
mitigation design and monitoring,
environmental permitting, threatened
and endangered species surveys and
assessments, habitat mapping and tree
inventories and arborist services.
Relevant Project Experience:
City of Miami Fairlawn Community
Park - Under our continuing services
contract with the City of Miami, Miller
Legg was awarded the development of
programming, pre-design/concept,
design, construction document
preparation and construction phase
services for a new park on SW 63rd
Avenue. The scope includes civil
engineering, landscape architecture,
certified arborist, surveying and SUE,
structural, electrical and geotechnical
engineering as well as permitting, opinion
of probable cost and limited
construction administration. The passive
park will contain a shaded/fenced
children's playground, dog run, shared
pedestrian / bicyclist perimeter path,
light bollards, benches, pedestrian pole
lighting, irrigation, water fountain, bike
racks, receptacles, hardscape furniture,
access driveway and perimeter privacy
walls. Permitting will be coordinated
with the City of Miami, Miami-Dade
County DERM, WASD and SFWMD.
Survey services include boundary and
topographic and tree inventory. Miller
Legg will assist the City with the
presentation of conceptual designs at
Community Meetings to gather public
input for a final design.
City of Miami E.G. Sewell Park -
Miller Legg is under contract with the
City of Miami for program development,
pre-design, master planning design
including public involvement workshops,
construction documents and
construction administration services for
Sewell Park. The program will be an
open passive park with elements
including passive walkways through park
and preserve areas, pavilions, an eco
trail, baywalk, hardscape, floating docks,
kayak launch, seawall/living shoreline,
wayfinding and historical information
signage. The scope of services includes
landscape architecture, irrigation, civil
engineering, topographical surveying,
SUE, certified arborist, structural
engineering, electrical engineering,
geotechnical engineering, archeological,
permitting, bidding assistance and limited
construction administration. Miller Legg
will also conduct a Bonneted Bat survey
and perform a bathymetric survey for
the seawall component. The firm is
assisting the City to gather community
stakeholder input during the design
process. Government agency permitting
will be coordinated with Miami-Dade
Co. DERM, WASD and SFWMD.
City of Miami Beach Chase Avenue
and 34th Street Shared Path -
Under its continuing services agreement
with the City of Miami Beach, Miller Legg
was retained to provide surveying, civil
engineering and landscape architecture
services related to the new Chase
Avenue and 34th Street shared path and
roadway improvements project. The 10-
ft shared use path will support the use of
simultaneous pedestrian and bicycle
activity. The scope of services includes
topographic surveying, tree inventory,
disposition and permitting; irrigation,
landscape, hardscape and amenities
design, site civil design development for
clearing/demolition, signage and marking,
paving, grading, drainage and erosion
control/pollution prevention. Team
subconsultants are performing
geotechnical tasks (soil test borings and
SFWMD exfiltration tests) and electrical
engineering/site lighting. Miller Legg is
also responsible for permitting
coordination with the City and Miami-
Matthew Dancho, MS, CA
Biologist (As Needed)
Page 594.2. Qualification of Key Personnel Assigned to Engagement
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
Dade DERM, as well as bidding
assistance/contract administration and
construction phase tasks including
construction observation.
City of Homestead Biscayne-
Everglades Greenway Trail - Among
the services Miller Legg provided for this
3.2 mile, 12-foot-wide Biscayne
Everglades Greenway shared-use trail
project are landscape architectural,
engineering, surveying and environmental
services including preparation of FDOT-
approved construction documents,
design of regulatory and wayfinding signs,
pavement markings, safe pedestrian push
button crossing and necessary drainage
within the C-103 Canal right-of-way
from East Mowry Drive to SW 137th
Avenue in Homestead. The scope of
services was based upon a 2017 Florida
Shared-use Non-Motorized Trail
Agreement between the City of
Homestead and FDOT. Topographic and
SUE services were delivered. The scope
included engineering design and
permitting services for the shared-use
trail, associated drainage and roadway
pedestrian crossings. The firm also
carried out Preliminary Natural
Resource and Protected Species
Investigations and documents related to
designation of the Project by FDOT as a
Documented Categorical Exclusion.
City of Fort Lauderdale Mills Pond
Park Environmental Construction
Observation - The City of Fort
Lauderdale hired Miller Legg to provide
construction observation for a
freshwater wetland with tidal influence
restoration project in the highly
environmentally sensitive area at Mills
Pond Park. Miller Legg ensured
adherence to the specifications and
permit criteria and prevented accidental
damage to protected vegetation and
resources that were present on-site.
Construction of this off-site mitigation
was achieved through a combination of
nuisance and exotic vegetation removal
and planting of over 6,600 freshwater
and saltwater-tolerant trees, shrubs and
groundcover at the Park. Services
provided included: design, planting plans
and details, permitting modifications
through Broward County, South Florida
Water Management District, US Army
Corps of Engineers, bid specification
development, construction
administration, environmental
monitoring, cost estimates, scheduling,
sketch and legal descriptions,
conservation easement coordination,
construction layout, field modifications,
agency coordination, outreach program,
compliance and post-conservation
monitoring to ensure project success.
City of Oakland Park East Dog Park
- To assist with the City of Oakland
Park's plan to develop a 1-acre Dog Park
at the existing Richard Giusti Heart Par
Cours Park, Miller Legg was retained for
topographic and tree surveying, SUE,
engineering and landscape architecture
services as well as an opinion of probable
cost. The firm is providing schematic
designs and renderings to provide off-
street parking along NE 6th Avenue and
NE 36th Street, sidewalk connectivity,
modification to the existing jogging trail,
dog park design for small and large dogs
which includes landscape improvements,
tree additions, canopy shelters, water
stations, pet waste stations, benches and
asphalt walking paths. This project is
being performed under Miller Legg's
continuing services contract.
City of Tamarac Go-Forward
Roadway Landscape Master Plan
Update - Miller Legg provided the City
of Tamarac with an update to its
citywide Roadway Landscape Master
Plan. The project consisted of creating a
go-forward landscape roadmap guide
that will be implemented for years to
come. Miller Legg conducted a citywide
tree inventory assessment, an evaluation
of existing landscape, irrigation and
hardscape conditions, an overall
assessment of the existing character of
the road corridors, and an opportunities
and constraints analysis. The overall goal
was to create a Landscape Master Plan
that provides the City with typical
conceptual landscape concepts,
recommendations, guidelines, and
implementation strategies to follow. The
Master Plan was unanimously adopted by
the City Commission.
Doral Glades Park Wetlands
Monitoring - Miller Legg provided
environmental services at Doral Glades
Park. The wetlands monitoring project
involves wetland mitigation, site
compliance review and maintenance,
contractor observation and oversight, as
well as pre- and post-herbicidal
contractor review for treatment of
invasive/exotic and nuisance plant
species. In addition, this project included
the submission of annual Florida
Communities Trust (FCT) stewardship
reports on behalf of the City. This annual
report included on-site observation of
required structures and facilities along
with narrative and photo-documentation
reporting. The project enabled City Park
development and programming for the
passive environmental education facility.
Miller Legg also provided assessment and
corrective recommendations on installed
hardwood trees.
Port St. Lucie Landscape Architect-
Arborist for GPS Landscaping &
Signs Inventory - Miller Legg was
selected by the City of Port St Lucie to
update its municipal Tree and Landscape
Inventory using the City's on-line Tree
inventory portal. The firm is responsible
for inventorying new trees and landscape
beds on City property to collect bed
lines, genus/species, size, square footage,
condition in the case of plants;
genus/species, height, size, DBH,
measurement, condition, replacement
value in the case of trees; and location in
the case of signs. Miller Legg reports on
each City Entry Sign site with current
entry sign, plant and tree information
updates to the existing GPS database.
Designated locations include City Hall,
road rights-of-way, cul-de-sacs, pond
areas and entry signs.
Page 604.2. Qualification of Key Personnel Assigned to Engagement
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
>
Years of Experience: 26
Years With the Firm: 23
Registrations & Certifications:
Certified Arborist, FL, 2002
ISA Tree Risk Assessment, FL, 2021
FDEP Qualified Stormwater Management Inspector, FL, 2010
Education:
Associates Degree, Engineering
Broward College, 1997
Associate of Science, Wetlands Management Environmental
Science
Broward College, 2000
Professional & Civic Activities:
Member, Florida Association of Environmental Professionals
Member, International Society of Arboriculture
Member, Society for Range Management, Florida Section
Professional Experience:
Mr. Mann is a Senior Environmental
Specialist with significant experience in
both public and private sector projects in
Florida that focus on environmental
improvements, habitat restoration, and
mitigation issues. Specific services he has
provided to clients include: the
development and preparation of approved
Florida Communities Trust Grant
applications, management plans, and
stewardship reports including
coordination with staff to resolve scoring
and site development issues for local
municipalities, developing and delivering
complex county, state, and federal
environmental resource permit
applications, and practical field experience
involving environmental and conservation
principles and water resource engineering
as it relates to, water quality
improvements, flood control, natural
ecosystems, and municipal water supply.
Mr. Mann is a certified arborist and
provides the following consulting services
to both public and private sector clients:
tree species identification and inventories,
tree surveys and canopy mapping,
destroyed/damaged tree assessments,
tree value estimates, tree grading, tree
species selection for planting, mangrove
trimming oversight and tree permitting.
Relevant Project Experience:
City of Pembroke Pines Florida
Wetlandsbank - A 450-acre
entrepreneurial fresh water wetland
mitigation bank in Pembroke Pines.
Services provided included: site planning,
extensive negotiations with permitting
agencies, including the US Army Corps of
Engineers, South Florida Water
Management District and Broward
County, to secure dredge and fill, and
water management permits, establishment
of a mitigation credit system, design of a
balanced wetland ecosystem including a
wide variety of fresh water habitats and
hydroperiods necessary for a dynamic
self-sustaining system, extensive
hydrologic studies and reviews to
optimize critical hydrologic parameters,
preparation of bid documents, contract
administration, construction phasing, cost
estimates, wildlife stress management
plans, and construction inspection and
post construction monitoring. In addition,
a portion of the previous rock pit was
backfilled to greater than 25 feet and
brought up to wetlands restoration grade.
Award: Grand Award for Engineering
Excellence, American Council of Engineering
Companies, Florida Chapter, 1998
City of Pembroke Pines West Pines
Soccer Park - A 56-acre active and
passive municipal park located at 196th
Avenue and Pines Boulevard in the City of
Pembroke Pines. This unique park's
features included four soccer fields and
one football facility as well as providing
other active park elements with passive
park facilities such as a boardwalk and 21
acres of wetlands mitigation area. Services
provided by Miller Legg included civil
engineering, surveying, wetlands
mitigation planning, assistance with grant
writing, and mitigation construction
observation. Permitting was coordinated
with US Army Corps of Engineers,
Broward County and South Florida
Water Management District. Miller Legg
worked in concert with several other
consultants to deliver this project.
City of Plantation SR 817/University
Drive Bus Stop Improvements LAP
- Miller Legg was retained by the City of
Plantation to assist them prepare National
Environmental Policy Act (NEPA)
documentation. The firm performed an
environmental review of 22 existing bus
stops to meet Americans with Disability
Act (ADA) criteria and installation of
eight new bus shelters in the City of
Plantation. The work was completed
under a Local Area Provider (LAP)
agreement between the City of Plantation
and Florida Department of
Transportation (FDOT) District 4. The
goal of the project was to obtain federal
funding for the rehabilitation, upgrade, or
addition of 30 bus shelters along three
Paul Mann, CA, TRAQ
Senior Environmental Specialist (As Needed)
Page 614.2. Qualification of Key Personnel Assigned to Engagement
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
miles of University Drive. During the field
reviews, staff recorded floral and faunal
presence. The firm prepared a Type 1
Programmatic Categorical Exclusion
package and coordinated with the FDOT
on behalf of the City.
Port St. Lucie Landscape Architect-
Arborist for GPS Landscaping &
Signs Inventory - Miller Legg was
selected by the City of Port St Lucie to
update its municipal Tree and Landscape
Inventory using the City's on-line Tree
inventory portal. The firm is responsible
for inventorying new trees and landscape
beds on City property to collect bed
lines, genus/species, size, square footage,
condition in the case of plants;
genus/species, height, size, DBH,
measurement, condition, replacement
value in the case of trees; and location in
the case of signs. Miller Legg reports on
each City Entry Sign site with current
entry sign, plant and tree information
updates to the existing GPS database.
Designated locations include City Hall,
road rights-of-way, cul-de-sacs, pond
areas and entry signs.
City of Coral Springs Street Tree
Replacement Program - For this
street tree replacement program in the
City of Coral Springs, Miller Legg
developed a tree replacement flyer and
program to disseminate this information
to residents desiring to participate in this
program. The flyer included an overview
of the project as well as specific guidelines
and recommendations for the tree
replacement activities. The firm also
coordinated approval from the City staff
and assisted with its dissemination. In
addition, our landscape architecture staff
worked with the staff to review the
applications submitted and assist in the
review of plant installations facilitated by
this program.
City of Coral Springs Red Lichen
Post Monitoring - Miller Legg
performed five (5) years of required
mitigation monitoring at the City of Coral
Springs Red Lichen Sanctuary wetland,
followed by a further three (3) years of
hydrological monitoring. Miller Legg was
responsible for a biannual download of
hydrological data and maintenance of the
existing piezometer at the City of Coral
Springs Red Lichen Sanctuary wetland.
Data downloaded at the wetland location
was assembled and used in the
preparation of a water level hydrograph.
In addition general observations of the
site and site photographs were collected
and submitted.
City of Fort Lauderdale Mills Pond
Park Environmental Construction
Observation - The City of Fort
Lauderdale hired Miller Legg to provide
construction observation for a freshwater
wetland with tidal influence restoration
project in the highly environmentally
sensitive area at Mills Pond Park. Miller
Legg ensured adherence to the
specifications and permit criteria and
prevented accidental damage to protected
vegetation and resources that were
present on-site. Construction of this off-
site mitigation was achieved through a
combination of nuisance and exotic
vegetation removal and planting of over
6,600 freshwater and saltwater-tolerant
trees, shrubs and groundcover at the
Park. Services provided included: design,
planting plans and details, permitting
modifications through Broward County,
South Florida Water Management
District, US Army Corps of Engineers, bid
specification development, construction
administration, environmental monitoring,
cost estimates, scheduling, sketch and
legal descriptions, conservation easement
coordination, construction layout, field
modifications, agency coordination,
outreach program, compliance and post-
conservation monitoring to ensure
project success.
City of Pembroke Pines West Pines
Soccer Park - A 56-acre active and
passive municipal park located at 196th
Avenue and Pines Boulevard in the City of
Pembroke Pines. This unique park's
features included four soccer fields and
one football facility as well as providing
other active park elements with passive
park facilities such as a boardwalk and 21
acres of wetlands mitigation area. Services
provided by Miller Legg included civil
engineering, surveying, wetlands
mitigation planning, assistance with grant
writing, and mitigation construction
observation. Permitting was coordinated
with US Army Corps of Engineers,
Broward County and South Florida
Water Management District. Miller Legg
worked in concert with several other
consultants to deliver this project.
City of Orange City Tree Inventory -
Miller Legg performed a differential GPS
inventory of more than 2,000 trees
located within 10 City-owned properties,
as well as a 1,500 SF median along Graves
Avenue. Each tree inventoried had the
following data collected: species common
and scientific names, location coordinates,
trunk diameter, overall height, canopy
spread, general health/condition, and
notes on overall health/condition if
problems exist. General tree condition
was evaluated by an ISA Certified
Arborist for each tree inventoried. For
each site inventoried, the resulting data
was provided to the City via an aerial
photograph exhibit and tree inventory
table.
City of Miramar - Miramar Parkway
LAP Streetscape Improvements
from 62nd to 64th Avenue - Miramar
Parkway Streetscape Improvement
project was a Local Agency Program
(LAP)-funded revitalization project in the
City of Miramar. The project entailed
Miramar Parkway's eastern gateway
segment from 62nd to 64th Avenue,
approximately 1/2 mile in length. The
project included intersection
improvements, traffic signal
modifications/upgrades and sidewalk and
Florida Friendly landscape beautification
throughout the project limits. Services
provided included: surveying including
topographic surveying, maintenance of
traffic, underground utility designation,
landscape architecture, hardscape design,
drainage and stormwater permitting,
design and management, lighting and
electrical design, geotechnical design,
traffic engineering, tree permitting and
arborist services, as well as LAP
coordination, permitting and submittal
documentation. Miller Legg developed a
master plan for this corridor,
incorporating access management and
shared commercial parking facilities to
enhance the commercial viability of the
corridor. Utilizing the master plan,
extensive public outreach was conducted
with the corridor stakeholder to establish
consensus on the redevelopment and
roadway plan.
Page 624.2. Qualification of Key Personnel Assigned to Engagement
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
Years of Experience: 20
Years With the Firm: 19
Registrations & Certifications:
FDEP Qualified Stormwater Management Inspector, FL, 2011
Education:
Bachelor of Arts, Geology
Hartwick College, 1993
Continuing Education:
FDOT LAP Certification Webinar, 2015
FDOT Specifications Package Certification, 2020
Publications & Presentations:
FLERA Annual Conference, West Lark Park: A Successful
Habitat Restoration, 2011, Co-Presenter
Florida Chamber Environmental Permitting Summer School
Conference, Burrowing Owls: Issues Affecting
Conservation of Wildlife Species, 2018, Co-Author
SFAEP Annual Conference, West Lake Park: Mangroves,
Seagrass and Mudflats, 2010, Co-Presenter
Professional Experience:
Ms. Shipley is a Senior Environmental
Scientist responsible for wetland
determination and delineation, wetland
mitigation design and monitoring,
environmental permitting, threatened and
endangered species surveys and
assessments, benthic surveys, coral,
seagrass, and mangrove surveys and
monitoring.
Relevant Project Experience:
City of Sunny Isles Beach Pelican
Community Park - A three-acre active
park site, for which Miller Legg managed
landscape architecture, irrigation,
engineering, surveying and architecture
designs for a baseball field, recreation
building, playground structure,
gymnasium, and related site amenities
within the City of Sunny Isles Beach. The
project management team at Miller Legg
received recognition from the City for
their involvement in the design
completion of the park. In addition, Miller
Legg provided construction observation
services. In addition, we also provided
grant assistance to secure a Florida
Recreational Development Assistant
Program (FRDAP) grant for $200,000.
FRDAP is a competitive grant program
that provides financial assistance to local
governments for development or
acquisition of land for public outdoor
recreational purposes. Award: Award of
Merit, American Society of Landscape
Architects, Florida Chapter, 2009
City of Plantation Parks &
Recreation Master Plan - Miller Legg
was selected to prepare the first
Plantation Parks and Recreation Master
Plan. The firm provided comprehensive
recreation planning to create the Master
Plan. The Parks and Recreation Master
Plan is a tool intended to help the City of
Plantation meet the current and future
recreation needs of the community. The
resident-driven plan serves as a source of
applicable decision-making information,
and establishes clear goals and actionable
objectives to guide staff, advisory
committees, and City Council in their
work to maintain and enhance Plantation’s
system of parks, recreation facilities, and
programs over the next ten years. The
Plan was based upon research of existing
facilities and programs, recreation
opportunities and needs analyses specific
to City of Plantation demographics. To
effectively gather and disseminate
information during the planning phase,
Public Outreach was an important focus
of the project. Public workshops and
Public Online Survey assisted in
determining community recreation needs
and desires. All 42 Parks and 5
Community Centers sites were reviewed,
along with future expansion opportunities
to accommodate program requirements.
In addition, Miller Legg assisted the City
to achieve its prestigious national CAPRA
(Commission for Accreditation of Park
and Recreation Agencies) accreditation, a
demonstrated management system of
best practices and measure of agency
quality of operation, management and
service to the community.
City of Homestead Biscayne-
Everglades Greenway Trail - Among
the services Miller Legg provided for this
3.2 mile, 12-foot-wide Biscayne Everglades
Greenway shared-use trail project are
landscape architectural, engineering,
surveying and environmental services
including preparation of FDOT-approved
construction documents, design of
regulatory and wayfinding signs, pavement
markings, safe pedestrian push button
crossing and necessary drainage within
the C-103 Canal right-of-way from East
Mowry Drive to SW 137th Avenue in
Homestead. The scope of services was
based upon a 2017 Florida Shared-use
Non-Motorized Trail Agreement between
the City of Homestead and FDOT.
Topographic and SUE services were
delivered. The scope included engineering
design and permitting services for the
shared-use trail, associated drainage and
roadway pedestrian crossings. The firm
also carried out Preliminary Natural
Resource and Protected Species
Jennifer Shipley
Environmental Scientist (As Needed)
Page 634.2. Qualification of Key Personnel Assigned to Engagement
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
Investigations and documents related to
designation of the Project by FDOT as a
Documented Categorical Exclusion.
City of Coral Springs Red Lichen
Sanctuary - This 14-acre
environmentally sensitive land (ESL)
passive park site in Coral Springs includes
such features as walking trails, native
habitat restoration plantings, forested
wetland habitats and marsh wetland
habitats. Miller Legg provided biological
permitting and engineering services to
assist in the restoration of an upland fill
area to marsh. Services provided included
wetland jurisdictional verifications, WRAP
and WBI assessments, mitigation design,
and permitting with the US Army Corps
of Engineers, the South Florida Water
Management District, and Broward
County Department of Planning and
Environmental Protection. From 2005 to
2016, Miller Legg was responsible for a
biannual download of hydrological data
and maintenance of the existing
piezometer at the Red Lichen Sanctuary
wetland to assist the City with its review
of water level drawdowns associated with
utility operations. Data downloaded at
the wetland location was assembled and
used in the preparation of a water level
hydrograph. In addition, general
observations of the site and site
photographs were collected and
submitted.
City of Tamarac Prospect Road -
Landscape median corridor design for the
City of Tamarac. Services provided
included conceptual design through to
final design documents for landscape and
irrigation. Project included assistance in
documents for bidding, cost estimates and
coordination for a Broward Beautiful
grant.
City of Miramar Master Park Plan -
The update of the City’s Master Park Plan
involved significant research to update the
existing data. Future recreational needs
were outlined in this report. Additional
information prepared for this project
includes demographics, geographic
information systems (GIS) maps, resident
needs surveys, agency coordination, and
public workshops.
Doral Glades Park Boardwalk and
Wetland Preserve - Doral Glades Park
is a 25-acre recreational facility in the
northeast section of the City. Both
passive and active elements were
featured, including playing fields,
community and nature pavilions, fishing
pier, walking trail and wetland boardwalk.
Miller Legg provided both design and
permitting services as well as wetland and
boardwalk construction administration
services, using GIS and surface water
management support. The scope included
coordination with the City on permit
compliance, exotic species removal, native
species and maintenance programs; value
engineering and design for the
boardwalk(s) and pier(s). Miller Legg
developed a Wetland Mitigation Plan
including GIS maps and habitat evaluation
for placement of the boardwalks in ideal
locations within the wetland. These Plans
captured data from the original permits
issued by environmental agencies DERM,
SFWMD and USACOE. Further, Miller
Legg prepared construction drawings for
the upland boardwalk, pavilion, wetland
boardwalk and fishing pier. Finally, the
firm was responsible for the preparation
of environmental resource permit (ERP)
modification applications for boardwalk
and planting in wetland areas. Amenities
at the park include: kayak launch, fishing
pier, lake, playground, picnic areas,
boardwalks, a Green Globe Certified
(LEED Silver) nature center, bike lanes,
basketball courts, tennis courts and multi-
use fields.
City of Plantation PD&E Midtown
Bridge Improvement - The goal of this
City of Plantation PD&E and Design
project is to evaluate and design a 2-lane
divided bridge span over the SFWMD
New River Canal connecting SW 17th
Street in Plantation Midtown to
westbound State Road 84. Phase One
includes a preliminary engineering and
project development (PD&E) Study which
will follow FDOT PD&E standards and
procedures. The Study includes
environmental evaluation and public
involvement. The second phase is project
design and permitting. One year is
scheduled for the PD&E phase and one
additional year for design and permitting.
Landscape architecture, environmental
permitting, PD&E, Section 4(f), and
environmental analysis will be performed
as well as permitting coordination with
the City and FDOT. Miller Legg is a
subconsultant to Marlin Engineering.
City of Miramar Master Park Plan -
The update of the City’s Master Park Plan
involved significant research to update the
existing data. Future recreational needs
were outlined in this report. Additional
information prepared for this project
includes demographics, geographic
information systems (GIS) maps, resident
needs surveys, agency coordination, and
public workshops.
City of Coral Springs Red Lichen
Post Monitoring - Miller Legg
performed five (5) years of required
mitigation monitoring at the City of Coral
Springs Red Lichen Sanctuary wetland,
followed by a further three (3) years of
hydrological monitoring. Miller Legg was
responsible for a biannual download of
hydrological data and maintenance of the
existing piezometer at the City of Coral
Springs Red Lichen Sanctuary wetland.
Data downloaded at the wetland location
was assembled and used in the
preparation of a water level hydrograph.
In addition general observations of the
site and site photographs were collected
and submitted.
Pembroke Pines City Center - This
project consisted of approximately 100
acre mixed use project that was the last
phase of a 200 acre total development
that also included multi-family and
commercial land use components in
Pembroke Pines. The City Center project
consisted of design for a commercial and
town center concept with adjacent multi-
family residential components. Unique site
design components included
incorporation of a city park, linear 200’
wide FP&L easement that split the
property, an adjacent fuel pipeline
easement, as well as extensive
accommodation for stormwater
management systems and wetlands
mitigation areas. The project included the
filling of existing canals and associated
governmental agency permitting. Services
included environmental resource
permitting, mitigation design, mitigation
construction, maintenance observation,
remedial plan development, mitigation
monitoring and surveying.
Page 644.2. Qualification of Key Personnel Assigned to Engagement
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
Years of Experience: 23
Years With the Firm: 6
Registrations & Certifications:
Registered Professional Engineer, FL, 2003
Education:
Bachelor of Science, Civil Engineering
University of Central Florida, 1997
Professional & Civic Activities:
Member, American Society of Civil Engineers
Member, Commercial Real Estate Development Institute
Member, Florida Engineering Society
Member, International Council of Shopping Centers
Member, Urban Land Institute
Professional Experience:
Mr. Mojica has extensive project
management, design and permitting
experience in Florida and the Caribbean.
He has provided civil engineering design
and management services to both private
and public sector clients. As Regional
Engineering Manager, Mr. Mojica's
responsibilities include preparation of
proposals, negotiation of engineering
contracts, client relations, project
reporting, scheduling, budgeting,
management of technical staff and
subconsultants, design, and permitting.
He is highly skilled in CAD/Civil 3D,
ICPR and PONDS software.
Relevant Project Experience:
City of Coral Gables War Memorial
Youth Center Landscape &
Engineering - This City of Coral
Gables 7-acre War Memorial Youth
Center in Miami Dade County
represents a living memorial to Coral
Gables World War II veterans. The
project includes improvements to multi-
purpose athletic fields. Miller Legg was
responsible for the landscape
architecture, civil engineering design and
permitting of the improvement program.
Specific improvements included athletic
field drainage, re-sodding with Bermuda
"Celebration" turf and irrigation design.
The irrigation system ties into a non-
potable well system. Drainage
improvements consist of subsurface field
improvements that integrate with the
existing exfiltration and subsurface
drainage systems. Additional services
provided include: design development,
final construction documents, and
construction administration. Miller Legg
collaborated with MC Harry Associates
on this project.
City of Miami Fairlawn Community
Park - Under our continuing services
contract with the City of Miami, Miller
Legg was awarded the development of
programming, pre-design/concept,
design, construction document
preparation and construction phase
services for a new park on SW 63rd
Avenue. The scope includes civil
engineering, landscape architecture,
certified arborist, surveying and SUE,
structural, electrical and geotechnical
engineering as well as permitting, opinion
of probable cost and limited
construction administration. The passive
park will contain a shaded/fenced
children's playground, dog run, shared
pedestrian / bicyclist perimeter path,
light bollards, benches, pedestrian pole
lighting, irrigation, water fountain, bike
racks, receptacles, hardscape furniture,
access driveway and perimeter privacy
walls. Permitting will be coordinated
with the City of Miami, Miami-Dade
County DERM, WASD and SFWMD.
Survey services include boundary and
topographic and tree inventory. Miller
Legg will assist the City with the
presentation of conceptual designs at
Community Meetings to gather public
input for a final design.
City of Homestead Biscayne-
Everglades Greenway Trail - Among
the services Miller Legg provided for this
3.2 mile, 12-foot-wide Biscayne
Everglades Greenway shared-use trail
project are landscape architectural,
engineering, surveying and environmental
services including preparation of FDOT-
approved construction documents,
design of regulatory and wayfinding signs,
pavement markings, safe pedestrian push
button crossing and necessary drainage
within the C-103 Canal right-of-way
from East Mowry Drive to SW 137th
Avenue in Homestead. The scope of
services was based upon a 2017 Florida
Shared-use Non-Motorized Trail
Agreement between the City of
Homestead and FDOT. Topographic and
SUE services were delivered. The scope
included engineering design and
permitting services for the shared-use
trail, associated drainage and roadway
pedestrian crossings. The firm also
carried out Preliminary Natural
Resource and Protected Species
Investigations and documents related to
Joaquin Mojica, PE
Project Engineer (5% Availability)
Page 654.2. Qualification of Key Personnel Assigned to Engagement
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
designation of the Project by FDOT as a
Documented Categorical Exclusion.
City of Cocoa Beach CRA
Minutemen Causeway - Minutemen
Causeway is the “main street” within the
Cocoa Beach Central Business District,
providing a front door to City Hall and
direct access to the beach. Over the last
30 years, development within the
Minutemen Causeway corridor included a
mix of commercial, residential, and
lodging properties. This development
drastically increased the impervious
conditions of the corridor and significantly
impacted the stormwater system within
the area, causing regular flooding issues.
Miller Legg’s solutions for the Minutemen
Causeway project was a holistic design
approach to improve the stormwater /
drainage issues, while invigorating the
area’s economy by creating a pedestrian-
oriented beachfront promenade and
streetscapes. The project consisted of
significant landscape beautification and
geometric modifications to the corridor
to promote a pedestrian-friendly
environment and to stimulate economic
development. In conjunction with the
redevelopment, the project included low-
impact stormwater facilities to meet the
Total Maximum Daily Load reduction
requirements, as outlined within the
Indian River Lagoon Basin Management
Action Plan. These stormwater
improvements included pervious paver
sidewalks and parallel parking, bio-swales
with native vegetation, and underground
stormwater infiltration facilities with
nutrient absorption materials. The entire
project was a City pilot program for Low
Impact Design (LID) and Best
Management Practices (BMP) for
stormwater management. Utilizing this
innovative approach, this project was able
to secure significant funding from the
State, including almost $5 million from the
Florida Department of Environmental
Protection.
City of Lauderhill Sports Park - Miller
Legg was retained by the City of
Lauderhill to provide civil engineering
design, stormwater permitting, landscape
architecture, irrigation design,
construction specifications and bidding
assistance services for proposed amenities
improvements at the 12-acre Lauderhill
Sports Park. Replacement of the baseball
field and cricket pitch natural grass with
synthetic turf and the football scoreboard
replacement tasks have been finalized.
Miller Legg has also completed design of
the playground area wood chip surface
conversion to synthetic turf, playground
shade, modifications to portions of the
fitness trail and the addition of new fitness
stations trail and exercise equipment.
City of Oakland Park East Dog Park
- To assist with the City of Oakland Park's
plan to develop a 1-acre Dog Park at the
existing Richard Giusti Heart Par Cours
Park, Miller Legg was retained for
topographic and tree surveying, SUE,
engineering and landscape architecture
services as well as an opinion of probable
cost. The firm is providing schematic
designs and renderings to provide off-
street parking along NE 6th Avenue and
NE 36th Street, sidewalk connectivity,
modification to the existing jogging trail,
dog park design for small and large dogs
which includes landscape improvements,
tree additions, canopy shelters, water
stations, pet waste stations, benches and
asphalt walking paths. This project is
being performed under Miller Legg's
continuing services contract.
City of Miami Morningside Park
Tennis Center - The City of Miami
Morningside Park created an expanded
and improved tennis facility at this 42-acre
Park. The project included improvements
to an existing seven courts that had
experienced degradation due to drainage
and soil stabilization issues. A new court
layout was developed to increase the
facility to eight lighted courts and a warm-
up training wall amenity. Other tennis
improvements included upgraded lighting,
fencing ad shaded bench area. A central
courtyard was also developed as a key
element of the project design. This
courtyard created an inviting area for
players and spectators to gather before
and after matches. A themed paver field
with lush landscaping that embraces large
existing ficus trees creates a pleasant
gathering space not previously found at
Morningside Park, and helps establish it as
a premier public tennis destination in the
City of Miami. Miller Legg services
included civil engineering, landscape
architecture, permitting and limited
construction administration to assist the
City in the bidding, observation and
certification of the project improvements.
Arborist services included evaluating
existing trees for health, longevity and
relocation prospects. Once relocated, the
trees were monitored for ongoing
wellbeing on site. Apart from the City,
other agencies with jurisdiction for this
project include Miami-Dade County
Department of Environmental Resources
(DERM) and South Florida Water
Management District (SFWMD). Received
the Facility Showcase award by the Florida
Recreation & Park Association. Miller
Legg secured this project under the firm's
Continuing Services Agreement with the
City of Miami.
City of Miami Museum Park
Baywalk Phase 3 – Under our
Miscellaneous Landscape Architectural
Services contract, Miller Legg provided
landscape architecture, civil engineering,
lighting/electrical engineering, surveying,
permitting and limited construction
administration services for the Miami
Baywalk Phase 3 Project. Permitting for
project improvements was provided
through the City of Miami, Miami-Dade
County and South Florida Water
Management District. Underground utility
designation for electric and drainage
utilities was performed. The project is a
1/4 mile pedestrian-oriented urban
waterfront park and promenade on
Biscayne Bay, located adjacent to the east
coast greenway. It provides a unique open
space that links the American Airlines
Arena, Biscayne Boulevard, and Museum
Park. The Baywalk design includes custom
native stone benches, extensive paver
pedestrian spaces, salt-tolerant tropical
plantings, as well as themed lighting and
site amenities. Due to historic maritime
activities in the project area, soil
conditions were addressed through the
design of unique drainage facilities that
minimized potential groundwater impacts.
The Baywalk design solution also
improved visibility and lighting in the area
to discourage vagrancy issues that existed.
The planting design not only enhanced
aesthetics, but also buffered unsightly
adjacent parking and utility areas and
minimized exposed surfaces that had been
subject to graffiti.
Page 664.2. Qualification of Key Personnel Assigned to Engagement
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
Years of Experience: 39
Years With the Firm: 6
Registrations & Certifications:
Registered Professional Engineer, FL, 1985
Education:
Bachelor of Science, Civil Engineering Technology
Florida International University, 1981
Associate of Science, Civil Technology
Nassau Community College, 1976
Continuing Education:
Design of Infiltration & Extended Detention Basins, 2018
Design of Sand Filters & Bioretention Systems, 2018
Floodplain Engineering, 2018
Forensic Engineering - Failure Analysis of Metallic Materials,
2016
Horizontal Curve Safety, 2016
Metallurgical & Mechanical Failures, 2016
Roundabout Geometric Design, 2016
Professional Experience:
Mr. Schipske has more than three
decades of experience as a civil engineer
with a focus on land development, design
and construction in South Florida. He
has worked on multiple commercial,
industrial and residential projects
involving production and project
management across various technical
disciplines. In addition, he spent 3 years
as a senior engineering and construction
manager for an international firm
providing camp and logistics construction
services at Kandahar Airfield in
Afghanistan. Prior to joining Miller Legg,
Mr. Schipske was a founding principal of
two engineering firms and has held
senior positions at various civil
engineering and land development firms
in South Florida.
Relevant Project Experience:
City of Lauderhill NW Quadrant
Drainage Improvements - Miller Legg
provided to the City of Lauderhill site
civil engineering, preparation of
materials, construction specifications on
engineering plans, editing City front end
documents, bidding assistance and is
providing construction administration for
the proposed construction of a drainage
culvert connecting City Canals 28 and 37
crossing 50th Street, and construction of
a positive drainage system trunk system
on 82nd Avenue with branches on 44th
Court through 47th Court discharging
into City Canal 27. Construction
documents included storm drainage and
paving restoration improvements, paving,
grading, signing and marking, demolition
and storm drainage system. This project
was issued under our continuing services
contract with the City.
City of Lauderhill Sports Park -
Miller Legg was retained by the City of
Lauderhill to provide civil engineering
design, stormwater permitting, landscape
architecture, irrigation design,
construction specifications and bidding
assistance services for proposed
amenities improvements at the 12-acre
Lauderhill Sports Park. Replacement of
the baseball field and cricket pitch
natural grass with synthetic turf and the
football scoreboard replacement tasks
have been finalized. Miller Legg has also
completed design of the playground area
wood chip surface conversion to
synthetic turf, playground shade,
modifications to portions of the fitness
trail and the addition of new fitness
stations trail and exercise equipment.
City of Miramar Historic Public
Safety Complex - The City of
Miramar replaced the Civic Center and
Child Care building with a new one-story
24,000 SF building to accommodate its
police substation, storage, administrative
and other law enforcement and public
safety facilities, in addition to a surface
parking lot for safety vehicles. The new
building was certified Gold LEED
certification. Miller Legg provided civil
engineering design, permitting and
construction administration services as
part of the Architects Design Group
team. Government permitting included
the City of Miramar, Broward County
and FDEP. The firm also provided LEED
certification and value engineering review
services.
City of Coral Springs Forest Hills
Boulevard Pedestrian Lighting -
Miller Legg provided pedestrian lighting
analysis and design plans for the Forest
Hills Boulevard roadway loop starting
and ending at NW 27th Street in the
City of Coral Springs. A right-of-way
survey was also performed. This segment
of Forest Hills Boulevard is
approximately 1.5 miles in length.
City of Cocoa Beach CRA
Minutemen Causeway - Minutemen
Causeway is the “main street” within the
Cocoa Beach Central Business District,
providing a front door to City Hall and
direct access to the beach. Over the last
30 years, development within the
Minutemen Causeway corridor included
a mix of commercial, residential, and
William Schipske, PE
Quality Assurance / Quality Control (As Needed)
Page 674.2. Qualification of Key Personnel Assigned to Engagement
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
lodging properties. This development
drastically increased the impervious
conditions of the corridor and
significantly impacted the stormwater
system within the area, causing regular
flooding issues. Miller Legg’s solutions
for the Minutemen Causeway project
was a holistic design approach to
improve the stormwater / drainage
issues, while invigorating the area’s
economy by creating a pedestrian-
oriented beachfront promenade and
streetscapes. The project consisted of
significant landscape beautification and
geometric modifications to the corridor
to promote a pedestrian-friendly
environment and to stimulate economic
development. In conjunction with the
redevelopment, the project included
low-impact stormwater facilities to meet
the Total Maximum Daily Load reduction
requirements, as outlined within the
Indian River Lagoon Basin Management
Action Plan. These stormwater
improvements included pervious paver
sidewalks and parallel parking, bio-swales
with native vegetation, and underground
stormwater infiltration facilities with
nutrient absorption materials. The
entire project was a City pilot program
for Low Impact Design (LID) and Best
Management Practices (BMP) for
stormwater management. Utilizing this
innovative approach, this project was
able to secure significant funding from
the State, including almost $5 million
from the Florida Department of
Environmental Protection.
School Board of Broward County
(SBBC) Cooper City High School
Fire Loop Main - Miller Legg is
providing civil and surveying services for
the improvement of an existing fire loop
main at Cooper City High School.
Surveying services consist of topographic
and underground utility location
designation. The civil scope covers fire
main site work to serve four campus
buildings and includes agency approvals,
bidding assistance and final engineering
plan development including associated
restoration details. The firm is also
providing construction administration.
This project is part of the SBBC SMART
Renovations program.
City of Miramar Historic Public
Safety Complex - The City of Miramar
replaced the Civic Center and Child
Care building with a new one-story
24,000 SF building to accommodate its
police substation, storage, administrative
and other law enforcement and public
safety facilities, in addition to a surface
parking lot for safety vehicles. The new
building was certified Gold LEED
certification. Miller Legg provided civil
engineering design, permitting and
construction administration services as
part of the Architects Design Group
team. Government permitting included
the City of Miramar, Broward County
and FDEP. The firm also provided LEED
certification and value engineering review
services.
City of West Palm Beach 32nd/33rd
Streets Water Main Improvements
- Miller Legg provided surveying,
underground utility locates, geotechnical
engineering, civil engineering design and
bidding assistance services for a 2,700 LF
water and 2,000 LF gravity sewer 8"
water main replacement project on 32nd
Street and 33rd Street from Floral
Avenue to N. Flagler Drive and on N.
Flagler Drive from 32nd Street to 35th
Street in the historic Northwood Shores
district. The existing water mains were
transite, undersized, and had reached the
end of their useful life. The Basis of
Design Report (BODR) and
development of 30% plan scope involved
the assessment of water main
replacement, sanitary sewer
replacement/relocation (from rear yard
to street on 2 streets) and evaluation of
storm drainage improvements. The 1/4
mile project is located approx. 6,850 ft.
north of Palm Beach Lakes Boulevard on
the west side of N. Flagler Drive. Public
outreach with affected residents took
place and their concerns documented in
advance of the construction phase. This
project was completed under the firm's
multi-year City of West Palm Beach
General Engineering Services contract.
City of West Palm Beach Gregory
Road Green Streets LID Sanitary
Sewer & Stormwater - The City of
West Palm Beach requested Miller Legg
to provide professional engineering,
landscape architecture, surveying and
construction administration services for
the design and bidding assistance of a
stormwater management and drainage
improvements project in an existing
residential neighborhood. The project
involved the installation of +/- 700 LF of
exfiltration trench including four (4)
bioretention cell modules which
provided opportunities for various Low
Impact Development (LID) best
management practices to reduce
stormwater runoff and nuisance flooding.
LID implementation was facilitated by
the installation of bioretention in the
bumpouts on Gregory Road, and
nuisance flooding decreased through
driveway modifications and speed
control devices. The project is located
along Gregory Road and Gregory Place
between S. Olive Avenue and S. Flagler
Drive. Miller Legg provided construction
phase services consisting of bi-monthly
meetings with City and contractors,
construction observation site visits,
contractor change order responses,
minor fieldwork changes, shop drawing
and sample review, special inspections or
testing, as built review and approval,
contractor pay application
recommendations and completion
document review. Miller Legg also
conducted a public outreach meeting
prior to the start of construction. This
project was completed under the firm's
multi-year General Engineering Services
contract.
Page 684.2. Qualification of Key Personnel Assigned to Engagement
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
Years of Experience: 32
Years With the Firm: 4
Registrations & Certifications:
Registered Professional Engineer, FL, 1996
Education:
Bachelor of Science, Engineering
University of Florida, 1990
Professional & Civic Activities:
Past President, Florida Engineering Society - Calusa Chapter
Professional Experience:
Mr. Pellerito has extensive experience
and expertise in both small and large-
scale municipal and private sector, high-
complexity infrastructure projects. Peter
has successfully led multidisciplinary
teams in planning and design on a wide
range of civil engineering projects. His
project experience encompasses soil and
groundwater remediation; water
treatment and wastewater pre-treatment
systems; water and wastewater pump
stations and transmission lines; site
planning; earthwork; drainage systems;
paving and grading; erosion control /
stormwater pollution prevention;
roadway design and specifications. He is
proficient in Civil 3D, Traffic Impact
Statement analysis, open channel flow
modeling, and lift station design.
Relevant Project Experience:
City of Miramar Historic Public
Safety Complex - The City of
Miramar replaced the Civic Center and
Child Care building with a new one-story
24,000 SF building to accommodate its
police substation, storage, administrative
and other law enforcement and public
safety facilities, in addition to a surface
parking lot for safety vehicles. The new
building was certified Gold LEED
certification. Miller Legg provided civil
engineering design, permitting and
construction administration services as
part of the Architects Design Group
team. Government permitting included
the City of Miramar, Broward County
and FDEP. The firm also provided LEED
certification and value engineering review
services.
City of West Palm Beach Gregory
Road Green Streets LID Sanitary
Sewer & Stormwater - The City of
West Palm Beach requested Miller Legg
to provide professional engineering,
landscape architecture, surveying and
construction administration services for
the design and bidding assistance of a
stormwater management and drainage
improvements project in an existing
residential neighborhood. The project
involved the installation of +/- 700 LF of
exfiltration trench including four (4)
bioretention cell modules which
provided opportunities for various Low
Impact Development (LID) best
management practices to reduce
stormwater runoff and nuisance flooding.
LID implementation was facilitated by
the installation of bioretention in the
bumpouts on Gregory Road, and
nuisance flooding decreased through
driveway modifications and speed
control devices. The project is located
along Gregory Road and Gregory Place
between S. Olive Avenue and S. Flagler
Drive. Miller Legg provided construction
phase services consisting of bi-monthly
meetings with City and contractors,
construction observation site visits,
contractor change order responses,
minor fieldwork changes, shop drawing
and sample review, special inspections or
testing, as built review and approval,
contractor pay application
recommendations and completion
document review. Miller Legg also
conducted a public outreach meeting
prior to the start of construction. This
project was completed under the firm's
multi-year General Engineering Services
contract.
Hollywood Beach Golf Course and
Club House - Miller Legg is on the
architecture team to provide civil
engineering design services for the 104-
acre 18-hole Hollywood Beach Golf
Course project which includes the design
of a new golf course clubhouse and
parking lot, golf course remodeling and
accessory buildings within the parcel.
The project also plans to accommodate
approximately 8,800 LF of perimeter
greenway / pathway. The firm is assisting
with the development of the final
programming and conceptual plan,
including utility map, as-builts and
existing site condition research as well as
preparation of schematic design for tree,
plant beds and hardscape locations. Civil
design for the Clubhouse and Parking lot
Peter Pellerito, PE
Project Engineer (As Needed)
Page 694.2. Qualification of Key Personnel Assigned to Engagement
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
will include clearing/demolition,
geometry, signage and marking, utility,
paving, grading and drainage plans as well
as construction details. The design will
incorporate Crime Prevention Through
Environmental Design (CPTED)
principles. A paving, grading and drainage
plan will also be provided for the
proposed maintenance barn. Permitting
will be coordinated with the City of
Hollywood, Broward County and South
Florida Water Management District. The
scope includes preparation of a
stormwater report for the project. Miller
Legg will assist with construction phase
services including civil construction
administration.
Town of Davie Governor Leroy
Collins Farm Park - The new
Governor Leroy Collins Farm Park 80-
acre parcel was purchased in 2008
through a combination of funds from
Davie District 4 open space bonds,
Broward County, the Farm Bureau and
the Florida Communities Trust Fund.
The first phase of the park will consist of
20-acres of development and will include
an educational center, riding arena,
stables, farmers market and playground.
Located east of I-75, the park is being
built to preserve the rural lifestyle of the
Town of Davie. Miller Legg is providing
civil engineering, surveying, landscape
architecture, and environmental services
as part of the MC Harry team. The park
will provide volunteer opportunities,
farm tours, field trips, summer camps,
community gardens, and equestrian
programs for the special needs
population. Miller Legg's civil
engineering scope includes earthwork
analysis; paving, grading and drainage;
water and sanitary sewer, pavement
marking and signage, stormwater
pollution prevention; offsite
improvements; phasing plans, permitting
through the Town of Davie, Central
Broward Water Control District, City of
Sunrise, Florida Department of
Environmental Protection, Broward
County Environmental Protections and
South Florida Water Management
District; and construction administration.
The wetlands scope includes wetlands
due diligence, and the landscape
architecture scope includes planting
design, irrigation design and pedestrian
and equestrian trails. Surveying services
consisted of a topographic and tree
survey.
City of Miramar Historic Public
Safety Complex - The City of Miramar
replaced the Civic Center and Child
Care building with a new one-story
24,000 SF building to accommodate its
police substation, storage, administrative
and other law enforcement and public
safety facilities, in addition to a surface
parking lot for safety vehicles. The new
building was certified Gold LEED
certification. Miller Legg provided civil
engineering design, permitting and
construction administration services as
part of the Architects Design Group
team. Government permitting included
the City of Miramar, Broward County
and FDEP. The firm also provided LEED
certification and value engineering review
services.
City of West Palm Beach 32nd/33rd
Streets Water Main Improvements
- Miller Legg provided surveying,
underground utility locates, geotechnical
engineering, civil engineering design and
bidding assistance services for a 2,700 LF
water and 2,000 LF gravity sewer 8"
water main replacement project on 32nd
Street and 33rd Street from Floral
Avenue to N. Flagler Drive and on N.
Flagler Drive from 32nd Street to 35th
Street in the historic Northwood Shores
district. The existing water mains were
transite, undersized, and had reached the
end of their useful life. The Basis of
Design Report (BODR) and
development of 30% plan scope involved
the assessment of water main
replacement, sanitary sewer
replacement/relocation (from rear yard
to street on 2 streets) and evaluation of
storm drainage improvements. The 1/4
mile project is located approx. 6,850 ft.
north of Palm Beach Lakes Boulevard on
the west side of N. Flagler Drive. Public
outreach with affected residents took
place and their concerns documented in
advance of the construction phase. This
project was completed under the firm's
multi-year City of West Palm Beach
General Engineering Services contract.
City of West Palm Beach Gregory
Road Green Streets LID Sanitary
Sewer & Stormwater - The City of
West Palm Beach requested Miller Legg
to provide professional engineering,
landscape architecture, surveying and
construction administration services for
the design and bidding assistance of a
stormwater management and drainage
improvements project in an existing
residential neighborhood. The project
involved the installation of +/- 700 LF of
exfiltration trench including four (4)
bioretention cell modules which
provided opportunities for various Low
Impact Development (LID) best
management practices to reduce
stormwater runoff and nuisance flooding.
LID implementation was facilitated by
the installation of bioretention in the
bumpouts on Gregory Road, and
nuisance flooding decreased through
driveway modifications and speed
control devices. The project is located
along Gregory Road and Gregory Place
between S. Olive Avenue and S. Flagler
Drive. Miller Legg provided construction
phase services consisting of bi-monthly
meetings with City and contractors,
construction observation site visits,
contractor change order responses,
minor fieldwork changes, shop drawing
and sample review, special inspections or
testing, as built review and approval,
contractor pay application
recommendations and completion
document review. Miller Legg also
conducted a public outreach meeting
prior to the start of construction. This
project was completed under the firm's
multi-year General Engineering Services
contract.
City of West Palm Beach WPB
Omar Road Improvements - Miller
Legg provided surveying and engineering
services associated with analysis of the
existing drainage system from Omar
Road north along Parker Avenue and
west to Belvedere Road and I-95. This
road experiences significant flooding
during short duration high intensity
storm events. Along with our surveying
and geotechnical team members, the firm
evaluated contributing factors, provided
potential mitigation solutions and an
opinion of probable costs for such
prospective alternatives. This project
was completed under the firm's multi-
year General Engineering Services
contract.
Page 704.2. Qualification of Key Personnel Assigned to Engagement
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
Years of Experience: 28
Years With the Firm: 4
Registrations & Certifications:
Registered Professional Engineer, FL, 2005
Education:
Bachelor of Science, Civil Engineering
Florida International University, 1994
Professional Experience:
Mr. Harrelson has over 28 years of
design and management experience in
utility design, municipal engineering,
roadway design, land development and
construction management. He is highly
organized, motivated and technically
proficient with engineering designs,
engineering programs such as WaterCad,
AutoCad, and many drainage design
software programs. He has significant
experience leading large and high profile
projects within Miami-Dade, Broward
and Palm Beach Counties, which include
design, permitting and construction
management.
Relevant Project Experience:
City of Homestead Biscayne-
Everglades Greenway Trail - Among
the services Miller Legg provided for this
3.2 mile, 12-foot-wide Biscayne
Everglades Greenway shared-use trail
project are landscape architectural,
engineering, surveying and environmental
services including preparation of FDOT-
approved construction documents,
design of regulatory and wayfinding signs,
pavement markings, safe pedestrian push
button crossing and necessary drainage
within the C-103 Canal right-of-way
from East Mowry Drive to SW 137th
Avenue in Homestead. The scope of
services was based upon a 2017 Florida
Shared-use Non-Motorized Trail
Agreement between the City of
Homestead and FDOT. Topographic and
SUE services were delivered. The scope
included engineering design and
permitting services for the shared-use
trail, associated drainage and roadway
pedestrian crossings. The firm also
carried out Preliminary Natural
Resource and Protected Species
Investigations and documents related to
designation of the Project by FDOT as a
Documented Categorical Exclusion.
City of Miami Gardens Rolling Oaks
Regional Park - Renovations of Rolling
Oaks Regional Park include construction
of a new one-story 4,000 SF recreation
building, renovated restroom facilities,
expansion of walking trail with lighting,
distance marker, and exercise stations,
new pavilions, new parking lot,
refurbished basketball and tennis courts,
new fencing, new shaded playgrounds,
new landscaping and irrigation, addition
of horseshoe pits, sand volleyball, mini
golf and splashpad, and video system and
WIFI. Miller Legg is providing civil
engineering, landscape architecture and
surveying services for this 7-acre park as
a subconsultant to Synalovski, Romanik
and Saye Architects. The civil scope
includes design of a lift station and on-
site force main extension to service the
proposed Welcome Center. An arborist
assessment of existing trees and palms
was carried out as part of the landscape
architecture services.
City of Oakland Park East Dog Park
- To assist with the City of Oakland
Park's plan to develop a 1-acre Dog Park
at the existing Richard Giusti Heart Par
Cours Park, Miller Legg was retained for
topographic and tree surveying, SUE,
engineering and landscape architecture
services as well as an opinion of probable
cost. The firm is providing schematic
designs and renderings to provide off-
street parking along NE 6th Avenue and
NE 36th Street, sidewalk connectivity,
modification to the existing jogging trail,
dog park design for small and large dogs
which includes landscape improvements,
tree additions, canopy shelters, water
stations, pet waste stations, benches and
asphalt walking paths. This project is
being performed under Miller Legg's
continuing services contract.
City of Pembroke Pines West Pines
Soccer Park - A 56-acre active and
passive municipal park located at 196th
Avenue and Pines Boulevard in the City
of Pembroke Pines. This unique park's
features included four soccer fields and
one football facility as well as providing
other active park elements with passive
park facilities such as a boardwalk and 21
acres of wetlands mitigation area.
Glen Harrelson, PE
Project Engineer (As Needed)
Page 714.2. Qualification of Key Personnel Assigned to Engagement
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
Services provided by Miller Legg included
civil engineering, surveying, wetlands
mitigation planning, assistance with grant
writing, and mitigation construction
observation. Permitting was coordinated
with US Army Corps of Engineers,
Broward County and South Florida
Water Management District. Miller Legg
worked in concert with several other
consultants to deliver this project.
City of Miramar Historic Public
Safety Complex - The City of Miramar
replaced the Civic Center and Child
Care building with a new one-story
24,000 SF building to accommodate its
police substation, storage, administrative
and other law enforcement and public
safety facilities, in addition to a surface
parking lot for safety vehicles. The new
building was certified Gold LEED
certification. Miller Legg provided civil
engineering design, permitting and
construction administration services as
part of the Architects Design Group
team. Government permitting included
the City of Miramar, Broward County
and FDEP. The firm also provided LEED
certification and value engineering review
services.
City of Plantation Police
Department Firing Range - Miller
Legg provided survey, civil and
construction administration for the City
of Plantation Police Department Firing
Range project. Project scope included
topographic and tree survey, civil
engineering construction documentation
preparation, regulatory agency
construction document permitting,
coordination with project MEP and
structural engineers, as well as bidding
assistance and contract administration
for this approximately 1/2 acre project.
The scope included regulatory agency
construction document permitting for
drainage improvements, sanitary sewer,
potable water and fire protection service
line and building department review as
necessary. This work was performed as a
subconsultant to Architects Design
Group (ADG).
City of Miramar Ansin Sports
Complex Engineering Analysis - The
City of Miramar retained Miller Legg to
perform a site engineering analysis of the
existing lake at the Ansin Sports
Complex to determine whether the lake
can be filled to provide additional
buildable area on the site. The scope of
services involved analysis of the existing
stormwater management system and
coordination with the relevant
permitting agencies; South Broward
Drainage District and South Florida
Water Management District. Miller Legg
has also prepared boundary, topographic
and tree surveys at the site.
City of Miami Gardens Rolling Oaks
Regional Park - Renovations of Rolling
Oaks Regional Park include construction
of a new one-story 4,000 SF recreation
building, renovated restroom facilities,
expansion of walking trail with lighting,
distance marker, and exercise stations,
new pavilions, new parking lot,
refurbished basketball and tennis courts,
new fencing, new shaded playgrounds,
new landscaping and irrigation, addition
of horseshoe pits, sand volleyball, mini
golf and splashpad, and video system and
WIFI. Miller Legg is providing civil
engineering, landscape architecture and
surveying services for this 7-acre park as
a subconsultant to Synalovski, Romanik
and Saye Architects. The civil scope
includes design of a lift station and on-
site force main extension to service the
proposed Welcome Center. An arborist
assessment of existing trees and palms
was carried out as part of the landscape
architecture services.
School Board of Broward County
(SBBC) Cooper City High School
Fire Loop Main - Miller Legg is
providing civil and surveying services for
the improvement of an existing fire loop
main at Cooper City High School.
Surveying services consist of topographic
and underground utility location
designation. The civil scope covers fire
main site work to serve four campus
buildings and includes agency approvals,
bidding assistance and final engineering
plan development including associated
restoration details. The firm is also
providing construction administration.
This project is part of the SBBC SMART
Renovations program.
City of Delray Beach Pompey Park
Community Center and Campus
Design - Miller Legg is providing
surveying, SUE, civil engineering,
landscape architecture, permitting and
construction phase services associated
with the design of Pompey Park
Community Center and Campus in
Delray Beach. Surveying services consist
of specific service and topographic
surveys; subsurface utility engineering,
including vacuum excavations. Landscape
architecture scope elements are
associated with design of planting,
irrigation, hardscape, site amenities, two
(2) playgrounds, baseball fields
(relocation and restoration). A tree
inventory will be conducted by a firm
certified arborist. Schematic design tasks
include due diligence, code,
programming, site engineering, landscape
and hardscape schematic design
verification. Miller Legg will assist with
community outreach and relevant City
agency design review presentations
throughout the process. Permitting
coordination will be conducted with the
City Engineering and Water and Sewer
departments, Lake Worth Drainage
District and Palm Beach County Health
Department.
City of Dania Beach Southeast
Drainage Improvements Phase 2 -
Miller Legg is providing civil engineering,
permitting and landscape architecture
services for this drainage improvement
project to improve current flooding
issues at the 103-acre neighborhood
bounded by SE 3rd Street to the North,
SE 2 Ave to the West, SE 7 Street to the
South and SE 5th Avenue to the East.
Drainage solutions include pump
stations, drainage wells, exfiltration
trenches, etc. to reduce flooding,
including duration and severity, reduce
neighborhood impacts and mitigate
project costs. Miller Legg is a
subconsultant to WSP USA.
Page 724.2. Qualification of Key Personnel Assigned to Engagement
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
Years of Experience: 9
Years With the Firm: 5
Registrations & Certifications:
Registered Professional Engineer, FL, 2017
Education:
Bachelor of Science, Civil Engineering
University of Central Florida, 2012
Professional & Civic Activities:
Member, American Society of Civil Engineers
Member, Construction Association of South Florida
Professional Experience:
Mr. Andreoni is a Project Engineer
working for a variety of clients such as
municipalities, higher education and the
private sector. His experience includes
civil engineering services specifically in
the preparation of site plans, paving,
grading, and drainage plans, signing and
marking plans, water and sewer plans,
stormwater pollution prevention plans,
and permitting. Prior to joining Miller
Legg, he worked as a Project
Manager/Engineer and Staff Engineer at
materials testing and inspection firms in
South Florida.
Relevant Project Experience:
City of Miami Museum Park
Baywalk Phase 3 - Miller Legg
provided landscape architecture, civil
engineering, lighting/electrical
engineering, surveying, permitting and
limited construction administration
services for the Miami Baywalk Phase 3
Project. Permitting for project
improvements was provided through the
City of Miami, Miami-Dade County and
South Florida Water Management
District. Underground utility designation
for electric and drainage utilities was
performed.The project is a 1/4 mile
pedestrian-oriented urban waterfront
park and promenade on Biscayne Bay,
located adjacent to the east coast
greenway. It provides a unique open
space that links the American Airlines
Arena, Biscayne Boulevard, and Museum
Park. The Baywalk design includes
custom native stone benches, extensive
paver pedestrian spaces, salt-tolerant
tropical plantings, as well as themed
lighting and site amenities. Due to
historic maritime activities in the project
area, soil conditions were addressed
through the design of unique drainage
facilities that minimized potential
groundwater impacts. The Baywalk
design solution also improved visibility
and lighting in the area to discourage
vagrancy issues that existed. The planting
design not only enhanced aesthetics, but
also buffered unsightly adjacent parking
and utility areas and minimized exposed
surfaces that had been subject to graffiti.
This project was performed under our
Miscellaneous Landscape Architectural
Services contract.
City of Miramar Historic Public
Safety Complex - The City of Miramar
replaced the Civic Center and Child
Care building with a new one-story
24,000 SF building to accommodate its
police substation, storage, administrative
and other law enforcement and public
safety facilities, in addition to a surface
parking lot for safety vehicles. The new
building was certified Gold LEED
certification. Miller Legg provided civil
engineering design, permitting and
construction administration services as
part of the Architects Design Group
team. Government permitting included
the City of Miramar, Broward County
and FDEP. The firm also provided LEED
certification and value engineering review
services.
City of Lauderhill Sports Park -
Miller Legg was retained by the City of
Lauderhill to provide civil engineering
design, stormwater permitting, landscape
architecture, irrigation design,
construction specifications and bidding
assistance services for proposed
amenities improvements at the 12-acre
Lauderhill Sports Park. Replacement of
the baseball field and cricket pitch
natural grass with synthetic turf and the
football scoreboard replacement tasks
have been finalized. Miller Legg has also
completed design of the playground area
wood chip surface conversion to
synthetic turf, playground shade,
modifications to portions of the fitness
trail and the addition of new fitness
stations trail and exercise equipment.
City of Lauderhill NW Quadrant
Drainage Improvements - Miller Legg
provided to the City of Lauderhill site
civil engineering, preparation of
materials, construction specifications on
engineering plans, editing City front end
Christopher Andreoni, PE
Project Engineer (As Needed)
Page 734.2. Qualification of Key Personnel Assigned to Engagement
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
documents, bidding assistance and is
providing construction administration for
the proposed construction of a drainage
culvert connecting City Canals 28 and 37
crossing 50th Street, and construction of
a positive drainage system trunk system
on 82nd Avenue with branches on 44th
Court through 47th Court discharging
into City Canal 27. Construction
documents included storm drainage and
paving restoration improvements, paving,
grading, signing and marking, demolition
and storm drainage system. This project
was issued under our continuing services
contract with the City.
City of Fort Lauderdale Sailboat
Bend Traffic Calming
Improvements - This project was
conducted under the firm's traffic and
transportation engineering continuing
services contract with the City of Fort
Lauderdale. Miller Legg developed traffic
calming plans for the Sailboat Bend
residential historic district. The scope of
services entailed preparation of
preliminary documentation and
conceptual drawings drawn from
research and data collected including
traffic control device placement
locations; generation of draft roadway
and traffic calming design, specifications
and quantity tabulation, leading to
preparation of final traffic calming plans
based on comments and input from the
City, maintaining agency and the
contractor.
City of Oakland Park East Dog Park
- To assist with the City of Oakland
Park's plan to develop a 1-acre Dog Park
at the existing Richard Giusti Heart Par
Cours Park, Miller Legg was retained for
topographic and tree surveying, SUE,
engineering and landscape architecture
services as well as an opinion of probable
cost. The firm is providing schematic
designs and renderings to provide off-
street parking along NE 6th Avenue and
NE 36th Street, sidewalk connectivity,
modification to the existing jogging trail,
dog park design for small and large dogs
which includes landscape improvements,
tree additions, canopy shelters, water
stations, pet waste stations, benches and
asphalt walking paths. This project is
being performed under Miller Legg's
continuing services contract.
City of Oakland Park NE 12th
Terrace Streetscape Improvements
- Miller Legg assisted the City of Oakland
Park with preparation of an aerial
conceptual plan, typical cross sections
and FDOT cost estimate for
improvements within the right-of-way
along NE 12th Terrace that included a
proposed sidewalk, bike lanes, and two-
way angled street parking. The project
limits extended approximately 1,000 LF
south of East Oakland Park Boulevard
and approximately 2,350 LF between
Floranada Road and NE 40th Place.
Specific civil engineering services
provided for the roadway improvements
included existing and proposed
conditions within the right-of-way, a
conceptual design of pedestrian
connectivity to surrounding pedestrian
and bicycle facilities, and attendance at
two meetings associated with public
involvement.
City of West Palm Beach Gregory
Road Green Streets LID Sanitary
Sewer & Stormwater - The City of
West Palm Beach requested Miller Legg
to provide professional engineering,
landscape architecture, surveying and
construction administration services for
the design and bidding assistance of a
stormwater management and drainage
improvements project in an existing
residential neighborhood. The project
involved the installation of +/- 700 LF of
exfiltration trench including four (4)
bioretention cell modules which
provided opportunities for various Low
Impact Development (LID) best
management practices to reduce
stormwater runoff and nuisance flooding.
LID implementation was facilitated by
the installation of bioretention in the
bumpouts on Gregory Road, and
nuisance flooding decreased through
driveway modifications and speed
control devices. The project is located
along Gregory Road and Gregory Place
between S. Olive Avenue and S. Flagler
Drive. Miller Legg provided construction
phase services consisting of bi-monthly
meetings with City and contractors,
construction observation site visits,
contractor change order responses,
minor fieldwork changes, shop drawing
and sample review, special inspections or
testing, as built review and approval,
contractor pay application
recommendations and completion
document review. Miller Legg also
conducted a public outreach meeting
prior to the start of construction. This
project was completed under the firm's
multi-year General Engineering Services
contract.
City of Cocoa Beach CRA
Minutemen Causeway - Minutemen
Causeway is the “main street” within the
Cocoa Beach Central Business District,
providing a front door to City Hall and
direct access to the beach. Over the last
30 years, development within the
Minutemen Causeway corridor included
a mix of commercial, residential, and
lodging properties. This development
drastically increased the impervious
conditions of the corridor and
significantly impacted the stormwater
system within the area, causing regular
flooding issues. Miller Legg’s solutions
for the Minutemen Causeway project
was a holistic design approach to
improve the stormwater / drainage
issues, while invigorating the area’s
economy by creating a pedestrian-
oriented beachfront promenade and
streetscapes. The project consisted of
significant landscape beautification and
geometric modifications to the corridor
to promote a pedestrian-friendly
environment and to stimulate economic
development. In conjunction with the
redevelopment, the project included
low-impact stormwater facilities to meet
the Total Maximum Daily Load reduction
requirements, as outlined within the
Indian River Lagoon Basin Management
Action Plan. These stormwater
improvements included pervious paver
sidewalks and parallel parking, bio-swales
with native vegetation, and underground
stormwater infiltration facilities with
nutrient absorption materials. The
entire project was a City pilot program
for Low Impact Design (LID) and Best
Management Practices (BMP) for
stormwater management. Utilizing this
innovative approach, this project was
able to secure significant funding from
the State, including almost $5 million
from the Florida Department of
Environmental Protection.
Page 744.2. Qualification of Key Personnel Assigned to Engagement
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
Years of Experience: 16
Years With the Firm: 1
Registrations & Certifications:
Engineer In Training, FL
Registered Professional Engineer, FL, 2021
Education:
Bachelor of Engineering, Civil Engineering
Institute of Technology, Havana, 2006
Professional Experience:
Mr. Santana is a Project Engineer with an
expansive background in civil and roadway
engineering for both public and private
sector clients. He has robust site
development (water, sewer, paving,
drainage) as well as highway and
roundabout design and asbuilt experience.
Mr. Santana has highly developed
engineering software skills across a
number of platforms including Autodesk
Civil 3D, OpenRoads Designer, Inventor,
Naviswork and Infraworks.
Relevant Project Experience:
City of Miami Gardens Rolling Oaks
Regional Park - Renovations of Rolling
Oaks Regional Park include construction
of a new one-story 4,000 SF recreation
building, renovated restroom facilities,
expansion of walking trail with lighting,
distance marker, and exercise stations,
new pavilions, new parking lot,
refurbished basketball and tennis courts,
new fencing, new shaded playgrounds,
new landscaping and irrigation, addition of
horseshoe pits, sand volleyball, mini golf
and splashpad, and video system and
WIFI. Miller Legg is providing civil
engineering, landscape architecture and
surveying services for this 7-acre park as a
subconsultant to Synalovski, Romanik and
Saye Architects. The civil scope includes
design of a lift station and on-site force
main extension to service the proposed
Welcome Center. An arborist assessment
of existing trees and palms was carried
out as part of the landscape architecture
services.
City of Oakland Park East Dog Park
- To assist with the City of Oakland Park's
plan to develop a 1-acre Dog Park at the
existing Richard Giusti Heart Par Cours
Park, Miller Legg was retained for
topographic and tree surveying, SUE,
engineering and landscape architecture
services as well as an opinion of probable
cost. The firm is providing schematic
designs and renderings to provide off-
street parking along NE 6th Avenue and
NE 36th Street, sidewalk connectivity,
modification to the existing jogging trail,
dog park design for small and large dogs
which includes landscape improvements,
tree additions, canopy shelters, water
stations, pet waste stations, benches and
asphalt walking paths. This project is
being performed under Miller Legg's
continuing services contract.
Miami-Dade County Water and
Sewer Department (WASD) E15-
WASD-02 Relocation of 8 Pump
Stations - Miller Legg is conducting due
diligence and feasibility studies to relocate
and upgrade eight (8) pump stations (PS
0812, PS 0815, PS 0831, PS 0856, PS 0865,
PS 0867, PS 0882, PS 0894) identified as
having issues related to accessibility,
maintenance and deterioration. The scope
of work includes a complete report
evaluating possible alternative sites and
pump station layouts and providing more
feasible alternatives to facilitate the design,
permitting and construction of the new
pump stations. An analysis of gravity
sewer routing will be provided to ensure
maximum depths for wet wells and gravity
sewer lines are not exceeded. Meetings
with Miami-Dade Co. Public Works,
appropriate governmental agencies and
Homeowner Associations to discuss site
access will be scheduled as necessary. The
final deliverable will be a Due Diligence
and Feasibility Report to include site plan
sketches, permitting requirements, and
WASD comments.
University of Miami (UM) Knight
Recital Hall Construction Trailer -
Miller Legg is providing civil engineering
services for the preparation of a
temporary construction compound
associated with the Knight Recital Hall at
the University of Miami. The scope
includes preparation of site civil
engineering construction documents.
Hollywood Beach Golf Course and
Club House - Miller Legg is on the
architecture team to provide civil
engineering design services for the 104-
acre 18-hole Hollywood Beach Golf
Ismael Santana, PE
Project Engineer (As Needed)
Page 754.2. Qualification of Key Personnel Assigned to Engagement
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
Course project which includes the design
of a new golf course clubhouse and
parking lot, golf course remodeling and
accessory buildings within the parcel. The
project also plans to accommodate
approximately 8,800 LF of perimeter
greenway / pathway. The firm is assisting
with the development of the final
programming and conceptual plan,
including utility map, as-builts and existing
site condition research as well as
preparation of schematic design for tree,
plant beds and hardscape locations. Civil
design for the Clubhouse and Parking lot
will include clearing/demolition, geometry,
signage and marking, utility, paving, grading
and drainage plans as well as construction
details. The design will incorporate
Crime Prevention Through Environmental
Design (CPTED) principles. A paving,
grading and drainage plan will also be
provided for the proposed maintenance
barn. Permitting will be coordinated with
the City of Hollywood, Broward County
and South Florida Water Management
District. The scope includes preparation
of a stormwater report for the project.
Miller Legg will assist with construction
phase services including civil construction
administration.
Fort Lauderdale Executive Airport
(FXE) Mitigation Services Parcel
21B - Fort Lauderdale Executive Airport
(FXE) is developing a portion of Parcel
21B, located north of Commercial
Boulevard and west of NW 21st Avenue,
as a parking lot for airport tenant
employees, rental car companies, and long
term customer parking. The parcel is
approximately six acres and is designated
as a Natural Resource Area by Broward
County Environmental Protection and
Growth Management Department
(BCEPGMD). Miller Legg is providing
preparation of a conservation easement
and environmental mitigation services on
the parcel.
Broward County Convention
Center Expansion Owner's
Representative - Miller Legg is part of
The Weitz Company Owners
Representative Team acting on behalf of
Broward County for the expansion of the
Convention Center and new Hotel. The
expansion includes the addition of an 800-
room, 29-story headquarters hotel,
exhibit hall space, retail establishments,
urban open space development and
associated parking structure(s) on a 44-
acre site that lies within the City limits of
Fort Lauderdale, adjacent to Port
Everglades. In the Owners Representative
role, Miller Legg has provided the
following: development of site civil
engineering and traffic elements included
in the design criteria package developer
solicitation, site traffic circulation study,
preliminary project scheduling,
preliminary development and review of
developer agreements, and developer
proposal submission review.
Furthermore, since October 2019, the
firm is performing sitewide civil
construction observation services for this
multi-phased project.
Broward County Forensic Science
Center (Medical Examiner Office
and Sheriff Office Crime
Laboratory) - Miller Legg provided due
diligence services related to the pre-
design phase of the Broward County
Forensic Science Center which will house
the Broward County Medical Examiner
Office and Broward Sheriff's Office Crime
Laboratory. This combined facility will be
constructed on a 7-acre vacant parcel in
Fort Lauderdale. The due diligence
services included analysis of site
conditions, review of client-provided
information, zoning and land planning
regulations analysis, civil design
recommendations, as well as client
coordination. Miller Legg is now providing
civil engineering services from schematic
design to construction documents as well
as bidding assistance, land planning DRC
site plan submittal, and construction
administration services for this 177,000 SF
$210 million project.
Broward County Sheriff's Office
New Training Center Garage
Design/Build - Miller Legg is part of the
ANF Group Design Build Team
contracted to develop the Broward
County Sheriff's Office (BSO) planned
new Training Center Parking Garage in
Fort Lauderdale. The project consists of
an 80,000 SF 7-story structure, 2 stories
for training and 5 stories for 700+ parking
spaces. Miller Legg's scope of services
includes site surveying, site civil and utility
infrastructure engineering, landscape
architecture and permitting assistance.
Survey services include topographic and
tree surveying as well as underground
utilities designation and mapping.
Landscape architecture services include
landscape planting and irrigation design.
The firm's certified arborists will collect
site data to prepare tree disposition and
mitigation construction documents.
Permitting coordination will take place
with Broward County Environmental
Management Division, Fire Department,
Health Department and with SFWMD.
The firm will be responsible for civil,
landscape and irrigation, construction
observation and administration. This
project is being pursued for LEED Silver
Certification.
Broward County South New
Regional Courthouse Pre-Design
Phase - Miller Legg is providing pre-
design civil engineering services related to
the development of the new Broward
County South Regional Courthouse in
Hollywood. The firm is responsible for
site civil and landscape architecture
programming, detailed site plan design
evaluation, assistance with project
development schedule including code
compliance due-diligence, agency review
processes and timeline, and approval
requirements for site design completion,
construction cost estimates, and
estimated construction schedule. Site
design evaluation included anticipated
traffic generation and evaluation of traffic
flow patterns. The traffic volume and
flow patterns identified necessary
infrastructure to accommodate including
off-site dedicated right-turn lanes, design
and implementation of a functional round-
about incorporated into the proposed
facility, and off-site lane assignments by
means of striping to accommodate an off-
site left-in. Additional site design
evaluation included preliminary drainage
calculations to determine size
requirements for underground
stormwater storage system. An alternate
site and program was subsequently
selected by the County and in early 2022
Miller Legg performed a program analysis
for the alternate site and pre-design
analysis to include the alternate site traffic
and pedestrian circulation, public
transportation, stormwater design, zoning
and building setbacks evaluation.
Page 764.2. Qualification of Key Personnel Assigned to Engagement
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
Years of Experience: 6
Years With the Firm: 0
Education:
Bachelor of Science, Civil Engineering
Universidad Tecnologia de La Habana (CUJAE, Havana,
2015
Professional Experience:
Mr. Vazquez is a Project Engineer with a
background in civil and transportation
design. He has worked on public and
private sector projects involving a variety
of elements such as site development,
road, intersection and interchange
design, utility design, feasibility studies,
environmental impact assessments and
erosion control. He is skilled in
AutoCAD products, Revit and Sketchup.
Relevant Project Experience:
Town of Davie New Town Hall
Engineering Design Criteria
Package (DCP) - Miller Legg is
contracted with the Town of Davie for
surveying and the engineering Design
Criteria Package for the proposed new
Town Hall site. Boundary and
Topographic Surveying has been
completed using laser scanner
technology and conventional surveying
methods. The dense tree canopy on the
southern portion of the site proved a
challenge for the scanner crew. The use
of the scanning technology improved the
anticipated schedule for the deliverable.
Miller Legg is coordinating with Town
staff to prepare the master roadways,
access points, and utilities for the Town
Hall site which will include the other
construction sites adjacent to the Town
Hall site. Miller Legg is working to
coordinate the relocation of utilities for
the Town Hall site and the upgrade to
the Town Hall lift station, which serves
the Town Hall site and adjacent
proposed and existing developments.
The scope also includes a civil and
landscape architecture site feasibility
study, bidding and permitting assistance
and construction administration.
City of Oakland Park East Dog Park
- To assist with the City of Oakland
Park's plan to develop a 1-acre Dog Park
at the existing Richard Giusti Heart Par
Cours Park, Miller Legg was retained for
topographic and tree surveying, SUE,
engineering and landscape architecture
services as well as an opinion of probable
cost. The firm is providing schematic
designs and renderings to provide off-
street parking along NE 6th Avenue and
NE 36th Street, sidewalk connectivity,
modification to the existing jogging trail,
dog park design for small and large dogs
which includes landscape improvements,
tree additions, canopy shelters, water
stations, pet waste stations, benches and
asphalt walking paths. This project is
being performed under Miller Legg's
continuing services contract.
Miami Dade College (MDC) North
Campus Roadway Assessment -
Miller Legg is providing engineering,
surveying and landscape architecture
consulting services to help assess the
existing roadway conditions and provide
engineering plans to help address
stormwater ponding at the Miami Dade
College North Campus. Engineering
services include roadway and drainage
field condition assessment and report,
including recommendations for
pavement, curbing, drainage flow, traffic
circulation and landscaping issues. In
addition, Miller Legg will provide
surveying and construction
administration services.
School Board Broward County
(SBBC) Stirling Elementary Traffic
Circulation - Miller Legg is reviewing
proposed circulation options developed
by SBBC staff in order to provide a site
circulation study and conceptual plans
for the improvements of site traffic
circulation and to attempt to eliminate
traffic congestion for Stirling Elementary
School in Hollywood, FL. The study will
include stacking, staging and circulation
elements and conceptual planning will
meet all ADA requirements related to
the site.
Pembroke Falls Tree Inventory -
Miller Legg performed arborist services
and street tress inventory for the
Pembroke Falls community, which
consists of 18 subdivisions. Upon
completion of these services, the
community retained Miller Legg to
perform additional services including
drainage permitting, sidewalk repair plans
and surveying.
Mowry Estates Subdivision
(Individual Experience) - Provided
engineering design of water, sewer,
paving, grading, pavement marketing and
signal, drainage for a subdivision
developed by D.R. Horton in
Homestead, FL.
Kendall Assemblage Subdivision
(Individual Experience) - Provided
engineering design of water, sewer,
paving, grading, pavement marketing and
signal, drainage for a residential
subdivision developed by Lennar Homes
in Miami-Dade County, FL.
Jinama Farms Subdivision
(Individual Experience) - Provided
engineering design of water, sewer,
paving, grading, pavement marketing and
signal, drainage for a subdivision
developed by D.R. Horton in Miami-
Dade County.
Carlos Vazquez
Project Engineer (As Needed)
Page 774.2. Qualification of Key Personnel Assigned to Engagement
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
Years of Experience: 43
Years With the Firm: 37
Registrations & Certifications:
Registered Professional Surveyor & Mapper, FL, 1998
Continuing Education:
Land Boundaries, 2018
Wetlands Delineation, 2018
Professional & Civic Activities:
Past Vice President, Florida Surveying & Mapping Society,
Broward Chapter
Professional Experience:
Mr. Rossi is a Senior Project Surveyor
with more than four decades of
surveying and subsurface utility
engineering (SUE) experience. His
principal areas of experience include
surveys such as boundary, topographic,
ALTA/ACSM land title surveys, quantity,
environmental and wetland,
condominium, construction layout, as-
built, right-of-way, specific purpose and
subdivisions and platting, as well as
subsurface utility engineering (SUE). He
currently manages the South Florida
survey department and field crews and is
an Associate with the firm.
Relevant Project Experience:
City of Sunny Isles Beach Gwen
Margolis Park and Pelican
Community Park Artificial Turf -
The project consisted of the
reconstruction of existing natural turf
fields at Pelican Community Park and
Senator Gwen Margolis Park in the City
of Sunny Isles Beach with artificial turf.
Miller Legg provided the preparation and
permitting of drainage plans to collect
under the new drain systems installed as
part of the project, as well as surveying
services. In addition, construction
observation was provided to verify
compliance with the plans and for the
certification of the project through
regulatory agencies.
City of Sunny Isles Beach Pelican
Community Park - A three-acre active
park site, for which Miller Legg managed
landscape architecture, irrigation,
engineering, surveying and architecture
designs for a baseball field, recreation
building, playground structure,
gymnasium, and related site amenities
within the City of Sunny Isles Beach.
The project management team at Miller
Legg received recognition from the City
for their involvement in the design
completion of the park. In addition,
Miller Legg provided construction
observation services. In addition, we
also provided grant assistance to secure
a Florida Recreational Development
Assistant Program (FRDAP) grant for
$200,000. FRDAP is a competitive grant
program that provides financial
assistance to local governments for
development or acquisition of land for
public outdoor recreational purposes.
Award: Award of Merit, American Society of
Landscape Architects, Florida Chapter, 2009
Sunny Isles Marina Survey - For this
3-acre marina site in the City of Sunny
Isles Beach, Miller Legg prepared and
updated an American Land Title
Association (ALTA) survey as well as a
topographic survey of the docks.
City of Homestead Biscayne-
Everglades Greenway Trail - Among
the services Miller Legg provided for this
3.2 mile, 12-foot-wide Biscayne
Everglades Greenway shared-use trail
project are landscape architectural,
engineering, surveying and environmental
services including preparation of FDOT-
approved construction documents,
design of regulatory and wayfinding signs,
pavement markings, safe pedestrian push
button crossing and necessary drainage
within the C-103 Canal right-of-way
from East Mowry Drive to SW 137th
Avenue in Homestead. The scope of
services was based upon a 2017 Florida
Shared-use Non-Motorized Trail
Agreement between the City of
Homestead and FDOT. Topographic and
SUE services were delivered. The scope
included engineering design and
permitting services for the shared-use
trail, associated drainage and roadway
pedestrian crossings. The firm also
carried out Preliminary Natural
Resource and Protected Species
Investigations and documents related to
designation of the Project by FDOT as a
Documented Categorical Exclusion.
City of Miami Armbrister Park
Community Center - Esther Mae
Armbrister Park is a 4.4-acre City of
Miami Park located at 4000 Grand
Avenue, Miami, FL 33133 in the Coconut
Martin Rossi, PSM
Project Surveyor | SUE Services | 3D Laser Scanner (5% Availability)
Page 784.2. Qualification of Key Personnel Assigned to Engagement
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
Grove neighborhood. Park amenities
include an existing community center,
baseball and football fields, tennis and
basketball courts, playground and
exercise equipment. The project involves
replacement of the existing community
center building with a new 10,000 SF 2-
story facility and outdoor pavilion. Miller
Legg is responsible for civil, landscape
architecture and SUE services along with
boundary, topographic and tree
surveying. The firm is providing site civil
and utility infrastructure research of
utility maps, as-builts and existing site
conditions followed by preparation of
civil, landscape architecture and
irrigation construction documents,
government agency permitting
coordination, bidding assistance, contract
administration and construction
administration. Tree inventory,
disposition plans and permitting are part
of the scope provided by the firm's
certified arborists.
City of Miami Beach Chase Avenue
and 34th Street Shared Path -
Under its continuing services agreement
with the City of Miami Beach, Miller Legg
was retained to provide surveying, civil
engineering and landscape architecture
services related to the new Chase
Avenue and 34th Street shared path and
roadway improvements project. The 10-
ft shared use path will support the use of
simultaneous pedestrian and bicycle
activity. The scope of services includes
topographic surveying, tree inventory,
disposition and permitting; irrigation,
landscape, hardscape and amenities
design, site civil design development for
clearing/demolition, signage and marking,
paving, grading, drainage and erosion
control/pollution prevention. Team
subconsultants are performing
geotechnical tasks (soil test borings and
SFWMD exfiltration tests) and electrical
engineering/site lighting. Miller Legg is
also responsible for permitting
coordination with the City and Miami-
Dade DERM, as well as bidding
assistance/contract administration and
construction phase tasks including
construction observation.
City of Miami Fairlawn Community
Park - Under our continuing services
contract with the City of Miami, Miller
Legg was awarded the development of
programming, pre-design/concept,
design, construction document
preparation and construction phase
services for a new park on SW 63rd
Avenue. The scope includes civil
engineering, landscape architecture,
certified arborist, surveying and SUE,
structural, electrical and geotechnical
engineering as well as permitting, opinion
of probable cost and limited
construction administration. The passive
park will contain a shaded/fenced
children's playground, dog run, shared
pedestrian / bicyclist perimeter path,
light bollards, benches, pedestrian pole
lighting, irrigation, water fountain, bike
racks, receptacles, hardscape furniture,
access driveway and perimeter privacy
walls. Permitting will be coordinated
with the City of Miami, Miami-Dade
County DERM, WASD and SFWMD.
Survey services include boundary and
topographic and tree inventory. Miller
Legg will assist the City with the
presentation of conceptual designs at
Community Meetings to gather public
input for a final design.
City of Miami Museum Park
Baywalk Phase 3 - Miller Legg
provided landscape architecture, civil
engineering, lighting/electrical
engineering, surveying, permitting and
limited construction administration
services for the Miami Baywalk Phase 3
Project. Permitting for project
improvements was provided through the
City of Miami, Miami-Dade County and
South Florida Water Management
District. Underground utility designation
for electric and drainage utilities was
performed.The project is a 1/4 mile
pedestrian-oriented urban waterfront
park and promenade on Biscayne Bay,
located adjacent to the east coast
greenway. It provides a unique open
space that links the American Airlines
Arena, Biscayne Boulevard, and Museum
Park. The Baywalk design includes
custom native stone benches, extensive
paver pedestrian spaces, salt-tolerant
tropical plantings, as well as themed
lighting and site amenities. Due to
historic maritime activities in the project
area, soil conditions were addressed
through the design of unique drainage
facilities that minimized potential
groundwater impacts. The Baywalk
design solution also improved visibility
and lighting in the area to discourage
vagrancy issues that existed. The planting
design not only enhanced aesthetics, but
also buffered unsightly adjacent parking
and utility areas and minimized exposed
surfaces that had been subject to graffiti.
This project was performed under our
Miscellaneous Landscape Architectural
Services contract.
City of Miami Beach 19th Street
Stormwater Pump Station &
Botanical Gardens - Miller Legg was
part of the Ric-Man Construction and
WSP team selected by the City of Miami
Beach for its Design-Build 19th Street
Stormwater Pump Station project, part
of the citywide Stormwater
improvement system. Construction of
this pump station is part of the overall
plan for the City-wide stormwater
improvement system to reduce flooding
for residents of the Washington Avenue
and Convention Center Drive
neighborhood. The existing system
consists of a collection network with no
storage or treatment capability which
discharged into the Collins Canal. The
project scope includes a stormwater
treatment system, energy dissipating
structure, seawall modifications and
connection of the trunk line to the
proposed pump station. Miller Legg's
survey services included topographic
surveying services to establish the
perimeter, show aboveground
improvements, trees, accessible storm
and sanitary structures, right of way and
easements. A survey of utility designation
markings was also provided. In addition,
the firm prepared an as-built survey of
constructed improvements on the 19th
Street pump station, the associated
parking area and the re-capping areas of
the seawall to show above ground utility,
storm system catch basins and manholes
with invert elevations, signage, and
parking stripping. Also, Miller Legg
provided tree inventory and analysis,
hardscape, landscape and irrigation
design.
Page 794.2. Qualification of Key Personnel Assigned to Engagement
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
Years of Experience: 27
Years With the Firm: 19
Registrations & Certifications:
Certified Survey Technician Level I, FL, 2008
Education:
Bachelor of Science, Electrical Engineering
Kiev Polytechnical University, Kiev, UK , 1987
Professional Experience:
Ms. Podolskaya is a Senior Survey
Technician who specializes in right-of-
way surveying, boundary surveying and
construction layout. She has worked on
boundary, topographic, right-of-way,
engineering design, construction layout,
and control surveys overseeing and
assisting with numerous projects for the
Florida Department of Transportation,
utilizing MicroStation. She also is
experienced in AutoCAD working with
numerous government and private
sector clients including municipalities and
counties, as well as for educational
facilities and health care clients, and
private developers.
Relevant Project Experience:
City of Sunny Isles Beach Gwen
Margolis Park and Pelican
Community Park Artificial Turf -
The project consisted of the
reconstruction of existing natural turf
fields at Pelican Community Park and
Senator Gwen Margolis Park in the City
of Sunny Isles Beach with artificial turf.
Miller Legg provided the preparation and
permitting of drainage plans to collect
under the new drain systems installed as
part of the project, as well as surveying
services. In addition, construction
observation was provided to verify
compliance with the plans and for the
certification of the project through
regulatory agencies.
City of Miami Moore Park NW 36th
Street Driveway Revisions - As part
of the design for Moore Park, revisions
and permitting were done for the access
into the park, and the parking lot along
NW 36th Street. In addition, Miller Legg
provided topographic and misc. surveys.
City of Miami Gardens Rolling Oaks
Regional Park - Renovations of Rolling
Oaks Regional Park include construction
of a new one-story 4,000 SF recreation
building, renovated restroom facilities,
expansion of walking trail with lighting,
distance marker, and exercise stations,
new pavilions, new parking lot,
refurbished basketball and tennis courts,
new fencing, new shaded playgrounds,
new landscaping and irrigation, addition
of horseshoe pits, sand volleyball, mini
golf and splashpad, and video system and
WIFI. Miller Legg is providing civil
engineering, landscape architecture and
surveying services for this 7-acre park as
a subconsultant to Synalovski, Romanik
and Saye Architects. The civil scope
includes design of a lift station and on-
site force main extension to service the
proposed Welcome Center. An arborist
assessment of existing trees and palms
was carried out as part of the landscape
architecture services.
City of Coral Springs Municipal
Complex - Miller Legg provided
assistance with the master planning
phase of the new Coral Springs Municipal
Complex development, which is part of a
larger effort to redevelop the downtown
section of Coral Springs. Services
provided for this 5-story 74,000 SF City
Hall building/4-story 607-space parking
garage include: site civil engineering,
survey, traffic (vehicular/pedestrian) and
utilities infrastructure requirements, site
permitting, overall project scope
development and significant construction
observation services. Site civil
engineering support-related services
concerned the surface water
management system, canal
reconfiguration, vehicular/pedestrian
access/connectivity, signing, pavement
marketing, parking improvements and
cost estimates. Survey services
comprised as-built design, cross-sections
and various site design surveys. In
addition, community-oriented
programming and planning process
including meeting attendance was
provided. Miller Legg was a
subconsultant to Song & Associates
Architects. The project was a Florida
AIA 2019 People's Choice Award
nominee.
Larisa Podolskaya, CST I
Senior CAD Technician (As Needed)
Page 804.2. Qualification of Key Personnel Assigned to Engagement
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
City of West Palm Beach Congress
Avenue Water Main Relocation -
Miller Legg provided civil engineering and
construction administration services for
the City of West Palm Beach for the
design and general contractor assistance
of a water main relocation project on
Congress Avenue at the City’s “F” Canal.
Relocation of the existing 10” water
main was required to accommodate a
Palm Beach County (County) Roadway
Improvement project, which includes
replacement of the existing Congress
Avenue “F” Canal Bridge with a double
66” RCP culvert system. Of the 300 LF
of 12" water main, 26 LF is sleeved
under a Lake Worth Drainage District
canal. The existing 10” water main is
attached to underside of the existing
bridge that will be demolished. In
addition, Miller Legg designed a liner to
navigate under the City's Canal F to
allow for future maintenance
requirements, pipe protection during
future dredging/maintenance and ease of
installation. The project is located on
Congress Avenue between Okeechobee
Boulevard and Ware Drive.
Construction phase services included 3
times weekly site inspections,
construction document clarification,
change order response, shop drawing
and sample review and approval, special
inspections or testing, contractor pay
application review, completion document
review. This project was completed
under the firm's multi-year General
Engineering Services contract.
City of Homestead Biscayne-
Everglades Greenway Trail - Among
the services Miller Legg provided for this
3.2 mile, 12-foot-wide Biscayne
Everglades Greenway shared-use trail
project are landscape architectural,
engineering, surveying and environmental
services including preparation of FDOT-
approved construction documents,
design of regulatory and wayfinding signs,
pavement markings, safe pedestrian push
button crossing and necessary drainage
within the C-103 Canal right-of-way
from East Mowry Drive to SW 137th
Avenue in Homestead. The scope of
services was based upon a 2017 Florida
Shared-use Non-Motorized Trail
Agreement between the City of
Homestead and FDOT. Topographic and
SUE services were delivered. The scope
included engineering design and
permitting services for the shared-use
trail, associated drainage and roadway
pedestrian crossings. The firm also
carried out Preliminary Natural
Resource and Protected Species
Investigations and documents related to
designation of the Project by FDOT as a
Documented Categorical Exclusion.
City of Fort Pierce Coastal
Construction Control Line
Permitting - Through our continuing
services contract with the City, Miller
Legg provided Coastal Construction
Control Line Permitting services for Jetty
Park, Kimberly Bergalis Park and South
Beach Boardwalk Park. Services included
existing site condition analysis, on-site
jurisdictional determination, and
preparation and submittal of applications
and sketches indicating project plan with
mitigation, and support data to the
Florida Department of Environmental
Protection. Miller Legg also prepared a
mitigation plan for Kimberly Bergalis and
South Beach Boardwalk Parks, which
included designing a plan to offset dune
impacts associated with the proposed
improvements.
City of Miami Museum Park
Baywalk Phase 3 - Miller Legg
provided landscape architecture, civil
engineering, lighting/electrical
engineering, surveying, permitting and
limited construction administration
services for the Miami Baywalk Phase 3
Project. Permitting for project
improvements was provided through the
City of Miami, Miami-Dade County and
South Florida Water Management
District. Underground utility designation
for electric and drainage utilities was
performed.The project is a 1/4 mile
pedestrian-oriented urban waterfront
park and promenade on Biscayne Bay,
located adjacent to the east coast
greenway. It provides a unique open
space that links the American Airlines
Arena, Biscayne Boulevard, and Museum
Park. The Baywalk design includes
custom native stone benches, extensive
paver pedestrian spaces, salt-tolerant
tropical plantings, as well as themed
lighting and site amenities. Due to
historic maritime activities in the project
area, soil conditions were addressed
through the design of unique drainage
facilities that minimized potential
groundwater impacts. The Baywalk
design solution also improved visibility
and lighting in the area to discourage
vagrancy issues that existed. The planting
design not only enhanced aesthetics, but
also buffered unsightly adjacent parking
and utility areas and minimized exposed
surfaces that had been subject to graffiti.
This project was performed under our
Miscellaneous Landscape Architectural
Services contract.
City of Homestead Campbell
Drive/SW 312th Street & SW 144
Avenue Crossing C-103-N Canal
End - Miller Legg provided a specific
purpose topographic survey and civil
engineering design services to the City
for emergency repairs of a guardrail
located on the east side of the north
parapet of FDOT Bridge No. 874353.
The bridge is located on Campbell
Drive/SW 312th Street and crosses the
C-103-N Canal. This project was
designed through the City's Library of
Consultants for Architectural and
Engineering services.
City of Miami Beach Chase Avenue
and 34th Street Shared Path -
Under its continuing services agreement
with the City of Miami Beach, Miller Legg
was retained to provide surveying, civil
engineering and landscape architecture
services related to the new Chase
Avenue and 34th Street shared path and
roadway improvements project. The 10-
ft shared use path will support the use of
simultaneous pedestrian and bicycle
activity. The scope of services includes
topographic surveying, tree inventory,
disposition and permitting; irrigation,
landscape, hardscape and amenities
design, site civil design development for
clearing/demolition, signage and marking,
paving, grading, drainage and erosion
control/pollution prevention. Team
subconsultants are performing
geotechnical tasks (soil test borings and
SFWMD exfiltration tests) and electrical
engineering/site lighting. Miller Legg is
also responsible for permitting
coordination with the City and Miami-
Dade DERM, as well as bidding
assistance/contract administration and
construction phase tasks including
construction observation.
Page 814.2. Qualification of Key Personnel Assigned to Engagement
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
Years of Experience: 25
Years With the Firm: 3
Registrations & Certifications:
Remote Pilot Certification, FL, 2020
Certified Survey Technician Level I, FL, 2021
Education:
Associate of Science, Drafting/CAD
ATI Career Training Center, 2002
Civil Engineering (2 of 5 yrs completed for Bachelor's)
National Autonomous University of Honduras, 1997
Continuing Education:
AutoDesk Training
Leica Cyclone & Cloudworx for AutoCAD
Professional Experience:
Sandro has more than 22 years of
professional surveying experience
ranging from a field crew chief to survey
manager overseeing survey crews. His
areas of expertise include land surveying,
boundary, topographic, ALTA, control
surveys, utility surveys, 3D Radar
Tomography, GPS, route surveys, legal
descriptions, laser scanning, and
construction layout calculations. He is
experienced in AutoCAD, Civil 3D,
Cyclone and CloudWorx, and Trimble
Geomatics Office.
Prior to joining Miller Legg, Sandro was
Survey Coordinator Manager with
another South Florida surveying firm for
15 years.
Relevant Project Experience:
City of Miami Fairlawn Community
Park - Under our continuing services
contract with the City of Miami, Miller
Legg was awarded the development of
programming, pre-design/concept,
design, construction document
preparation and construction phase
services for a new park on SW 63rd
Avenue. The scope includes civil
engineering, landscape architecture,
certified arborist, surveying and SUE,
structural, electrical and geotechnical
engineering as well as permitting, opinion
of probable cost and limited
construction administration. The passive
park will contain a shaded/fenced
children's playground, dog run, shared
pedestrian / bicyclist perimeter path,
light bollards, benches, pedestrian pole
lighting, irrigation, water fountain, bike
racks, receptacles, hardscape furniture,
access driveway and perimeter privacy
walls. Permitting will be coordinated
with the City of Miami, Miami-Dade
County DERM, WASD and SFWMD.
Survey services include boundary and
topographic and tree inventory. Miller
Legg will assist the City with the
presentation of conceptual designs at
Community Meetings to gather public
input for a final design.
City of Miami Armbrister Park
Community Center - Esther Mae
Armbrister Park is a 4.4-acre City of
Miami Park located at 4000 Grand
Avenue, Miami, FL 33133 in the Coconut
Grove neighborhood. Park amenities
include an existing community center,
baseball and football fields, tennis and
basketball courts, playground and
exercise equipment. The project involves
replacement of the existing community
center building with a new 10,000 SF 2-
story facility and outdoor pavilion. Miller
Legg is responsible for civil, landscape
architecture and SUE services along with
boundary, topographic and tree
surveying. The firm is providing site civil
and utility infrastructure research of
utility maps, as-builts and existing site
conditions followed by preparation of
civil, landscape architecture and
irrigation construction documents,
government agency permitting
coordination, bidding assistance, contract
administration and construction
administration. Tree inventory,
disposition plans and permitting are part
of the scope provided by the firm's
certified arborists.
City of Miami E.G. Sewell Park -
Miller Legg is under contract with the
City of Miami for program development,
pre-design, master planning design
including public involvement workshops,
construction documents and
construction administration services for
Sewell Park. The program will be an
open passive park with elements
including passive walkways through park
and preserve areas, pavilions, an eco
trail, baywalk, hardscape, floating docks,
kayak launch, seawall/living shoreline,
wayfinding and historical information
signage. The scope of services includes
landscape architecture, irrigation, civil
engineering, topographical surveying,
SUE, certified arborist, structural
engineering, electrical engineering,
geotechnical engineering, archeological,
Sandro Elvir, CST I
Senior CAD Technician (As Needed)
Page 824.2. Qualification of Key Personnel Assigned to Engagement
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
permitting, bidding assistance and limited
construction administration. Miller Legg
will also conduct a Bonneted Bat survey
and perform a bathymetric survey for
the seawall component. The firm is
assisting the City to gather community
stakeholder input during the design
process. Government agency permitting
will be coordinated with Miami-Dade
Co. DERM, WASD and SFWMD.
City of Miami Beach Chase Avenue
and 34th Street Shared Path -
Under its continuing services agreement
with the City of Miami Beach, Miller Legg
was retained to provide surveying, civil
engineering and landscape architecture
services related to the new Chase
Avenue and 34th Street shared path and
roadway improvements project. The 10-
ft shared use path will support the use of
simultaneous pedestrian and bicycle
activity. The scope of services includes
topographic surveying, tree inventory,
disposition and permitting; irrigation,
landscape, hardscape and amenities
design, site civil design development for
clearing/demolition, signage and marking,
paving, grading, drainage and erosion
control/pollution prevention. Team
subconsultants are performing
geotechnical tasks (soil test borings and
SFWMD exfiltration tests) and electrical
engineering/site lighting. Miller Legg is
also responsible for permitting
coordination with the City and Miami-
Dade DERM, as well as bidding
assistance/contract administration and
construction phase tasks including
construction observation.
City of Tamarac University Drive
Landscaping Improvements - Miller
Legg is providing landscape architecture,
hardscape, and irrigation design,
permitting, specific purpose survey of the
existing medians, utility coordination,
utility designation, and construction
administrative services for improvements
to the existing system of medians on
University Drive between NW 78th
Street and Southgate Blvd. in the City of
Tamarac. Certified Arborist services may
also be included for tree analysis,
removal and relocation needs.
Coordination with numerous agencies
including FDOT, SFWMD and the City
of Tamarac will also be performed. The
project has received funding from an
FDOT Grant and included creation of
MMOA (Maintenance agreements)
between the City and FDOT. Miller
Legg worked consistently with both the
City of Tamarac and FDOT to meet the
strict deadlines to receive this additional
funding.
City of Coral Gables Sunrise
Harbor Surveying - As part of the
team which conducted a drainage
infrastructure needs assessment within
the Sunrise Harbor neighborhood in
Coral Gables, Miller Legg was retained
to perform topographic surveying of
roadways within the subdivision to show
above-ground improvements including
evidence of utilities, sanitary and
drainage sewer structure rim elevations
and traffic signs. Invert elevations, pipe
sizes, directions and material were
shown in accessible storm and sanitary
sewer structures. A tree survey was
conducted to show trees in the right-of-
way as well as trunk diameters,
approximate heights and canopy spreads.
The scope also included topographic
surveys on specific lots and provided
bottom of canal elevations at outfalls and
outfall pipe invert elevations. Our crews
used our terrestrial field 3-D scanner to
complete this work in an expeditious
manner.
City of Miami Beach 20th Street &
Sunset Drive Pocket Park - Under
our Continuing Services Contract with
the City of Miami Beach, Miller Legg was
awarded an assignment to provide
survey, civil, geotechnical, electrical,
structural engineering and landscape
architecture services for the design,
permitting and construction of a new
ADA-accessible .33-acre pocket park at
20th Street and Sunset Drive. The firm
prepared a boundary and topographic
survey, assisted with the planning of key
program elements and performed
schematic design, design development,
construction document, bidding and
construction tasks. The design
incorporates Crime Prevention Through
Environmental Design (CPTED)
principles. Arborist and irrigation design
services were also furnished for this
project.
City of Homestead Biscayne-
Everglades Greenway Trail - Among
the services Miller Legg provided for this
3.2 mile, 12-foot-wide Biscayne
Everglades Greenway shared-use trail
project are landscape architectural,
engineering, surveying and environmental
services including preparation of FDOT-
approved construction documents,
design of regulatory and wayfinding signs,
pavement markings, safe pedestrian push
button crossing and necessary drainage
within the C-103 Canal right-of-way
from East Mowry Drive to SW 137th
Avenue in Homestead. The scope of
services was based upon a 2017 Florida
Shared-use Non-Motorized Trail
Agreement between the City of
Homestead and FDOT. Topographic and
SUE services were delivered. The scope
included engineering design and
permitting services for the shared-use
trail, associated drainage and roadway
pedestrian crossings. The firm also
carried out Preliminary Natural
Resource and Protected Species
Investigations and documents related to
designation of the Project by FDOT as a
Documented Categorical Exclusion.
City of Miami Gardens Rolling Oaks
Regional Park - Renovations of Rolling
Oaks Regional Park include construction
of a new one-story 4,000 SF recreation
building, renovated restroom facilities,
expansion of walking trail with lighting,
distance marker, and exercise stations,
new pavilions, new parking lot,
refurbished basketball and tennis courts,
new fencing, new shaded playgrounds,
new landscaping and irrigation, addition
of horseshoe pits, sand volleyball, mini
golf and splashpad, and video system and
WIFI. Miller Legg is providing civil
engineering, landscape architecture and
surveying services for this 7-acre park as
a subconsultant to Synalovski, Romanik
and Saye Architects. The civil scope
includes design of a lift station and on-
site force main extension to service the
proposed Welcome Center. An arborist
assessment of existing trees and palms
was carried out as part of the landscape
architecture services.
Page 834.2. Qualification of Key Personnel Assigned to Engagement
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
Years of Experience: 18
Years With the Firm: 15
Registrations & Certifications:
FDOT Intermediate Maintenance of Traffic, FL, 2021
Underground Utility Locate Certification, FL, 2022
Certified Survey Technician Level I, FL, 2021
Education:
High School GED
Killian Senior High School, 2001
Professional Experience:
Since joining Miller Legg, Mr. Edelman
worked his way up from Rod Person to
Party Chief. He has experience working
with both surveying and subsurface utility
engineering (SUE) projects for public
entities throughout South Florida.
Experience includes boundary,
topographic, right-of-way, as-built,
special purpose surveys, cross sections,
drainage surveys, construction surveys,
and a variety of other surveys.
Relevant Project Experience:
City of Sunny Isles Beach Gwen
Margolis Park and Pelican
Community Park Artificial Turf -
The project consisted of the
reconstruction of existing natural turf
fields at Pelican Community Park and
Senator Gwen Margolis Park in the City
of Sunny Isles Beach with artificial turf.
Miller Legg provided the preparation and
permitting of drainage plans to collect
under the new drain systems installed as
part of the project, as well as surveying
services. In addition, construction
observation was provided to verify
compliance with the plans and for the
certification of the project through
regulatory agencies.
City of Coral Springs Municipal
Complex Topographical Survey - In
preparation for the development of the
new City of Coral Springs Municipal
Complex, Miller Legg was retained to
prepare a topographic survey to
incorporate previously surveyed
portions of the property to show 50'
elevations as well as storm and sanitary
sewer inverts.
City of Miami Gardens Rolling Oaks
Regional Park - Renovations of Rolling
Oaks Regional Park include construction
of a new one-story 4,000 SF recreation
building, renovated restroom facilities,
expansion of walking trail with lighting,
distance marker, and exercise stations,
new pavilions, new parking lot,
refurbished basketball and tennis courts,
new fencing, new shaded playgrounds,
new landscaping and irrigation, addition
of horseshoe pits, sand volleyball, mini
golf and splashpad, and video system and
WIFI. Miller Legg is providing civil
engineering, landscape architecture and
surveying services for this 7-acre park as
a subconsultant to Synalovski, Romanik
and Saye Architects. The civil scope
includes design of a lift station and on-
site force main extension to service the
proposed Welcome Center. An arborist
assessment of existing trees and palms
was carried out as part of the landscape
architecture services.
City of Coral Gables Sunrise
Harbor Surveying - As part of the
team which conducted a drainage
infrastructure needs assessment within
the Sunrise Harbor neighborhood in
Coral Gables, Miller Legg was retained
to perform topographic surveying of
roadways within the subdivision to show
above-ground improvements including
evidence of utilities, sanitary and
drainage sewer structure rim elevations
and traffic signs. Invert elevations, pipe
sizes, directions and material were
shown in accessible storm and sanitary
sewer structures. A tree survey was
conducted to show trees in the right-of-
way as well as trunk diameters,
approximate heights and canopy spreads.
The scope also included topographic
surveys on specific lots and provided
bottom of canal elevations at outfalls and
outfall pipe invert elevations. Our crews
used our terrestrial field 3-D scanner to
complete this work in an expeditious
manner.
City of Coconut Creek Copans
Road Median Landscape
Architecture Plans - For this median
improvement project along Copans Road
between Lyons Road and the Florida
Turnpike Overpass, Miller Legg provided
landscape, hardscape and irrigation
design plans, tree inventory, surveying,
permitting, pre-construction and
construction observation services to the
Gerald Edelman, CST I
Survey Party Chief (As Needed)
Page 844.2. Qualification of Key Personnel Assigned to Engagement
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
City. Tree, streets and highway
permitting was coordinated with
Broward County.
City of Miami Beach 20th Street &
Sunset Drive Pocket Park - Under
our Continuing Services Contract with
the City of Miami Beach, Miller Legg was
awarded an assignment to provide
survey, civil, geotechnical, electrical,
structural engineering and landscape
architecture services for the design,
permitting and construction of a new
ADA-accessible .33-acre pocket park at
20th Street and Sunset Drive. The firm
prepared a boundary and topographic
survey, assisted with the planning of key
program elements and performed
schematic design, design development,
construction document, bidding and
construction tasks. The design
incorporates Crime Prevention Through
Environmental Design (CPTED)
principles. Arborist and irrigation design
services were also furnished for this
project.
City of Miami Beach Collins Park
Parking Garage - Miller Legg was a
subconsultant to the Zaha Hadid
Architects/Berenblum Busch Architects
Team providing property boundary and
topographic surveying of the proposed
Collins Park Parking Garage, as well as
topographic surveys of Liberty Avenue
from 21st to 23rd Streets. Collins Park
is at the southern end of South Beach,
adjacent to the Bass Museum, Miami City
Ballet and Miami-Dade Regional Public
Library, a neighborhood considered the
cultural destination of Miami Beach.
City of Miramar Forzano Park
Improvements Phase I - The City of
Miramar improved an existing 13-acre
active park to convert sport usage and
improve operating conditions. The
existing baseball clay infields, outfield and
football field grass were removed and
modified to provide additional
football/soccer field space. Park
amenities included volleyball courts and a
community center. As a subconsultant to
R.J. Behar, Miller Legg provided planning,
landscape architecture, irrigation design
and topographic survey.
City of Pembroke Pines Josias Dog
Park Surveying - Miller Legg prepared
a topographic survey of Josias Dog Park
located at Stirling Road and SW 193rd
Way in Pembroke Pines. The
approximately 3-acre site is experiencing
drainage issues and the City required a
very detailed topographic survey to be
performed to enable re-design.
Miami Beach South Beach
Boardwalk Dune & Tree Survey
and GIS Mapping - Miller Legg
updated its previous +/- 1100 LF
topographic and Coastal Construction
Control Line (CCCL) survey for a FDEP
Coastal Construction permit. This was
part of the beach boardwalk
improvements design project between
Lummus Park and South Point Drive in
South Beach. The topography included
trees and all above ground
improvements. Beach transects were
established to the Mean Water Line and
CCCL and Erosion Control Lines were
also established. The dune vegetation
survey included herbaceous, shrub and
tree species. Vegetation data was
collected using a sub-meter Trimble GPS
unit. Maps were then created in a GIS
program indicating dominant species
coverage with related percentages. In
addition a tree inventory for coastal tree
species and associated attributes was
conducted by our Certified Arborists
and displayed on digital maps.
St. Lucie County Paradise Park -
Miller Legg provided survey, SUE,
engineering, environmental, and
permitting services for design of
stormwater and roadway improvements
for the Phase 5, System 4, area of the
Paradise Park neighborhood in St. Lucie
County. The project limits included
approximately 55 acres of existing,
residential neighborhood which require
water quality treatment of stormwater
runoff, storm attenuation and paving of
existing rock roadways.
United States Department of
Veterans Affairs South Florida
National Cemetery Phase 2 Design-
Build - Miller Legg is providing civil,
survey, landscape architecture, irrigation
design and environmental services for
Phase 2 of this Design Build project
located in Lake Worth. Survey services
consist of boundary and topographic
surveys and surveyor title review.
Environmental tasks include wetland
mitigation assistance and threatened and
endangered species coordination in
addition to annual mitigation monitoring
over 5 years and gopher tortoise survey,
permitting and relocation. The firm is
providing landscape and irrigation design
development, construction and record
drawing documents. Civil construction
document preparation including signing
and pavement marking, pre-construction
and construction period services are also
being provided. Miller Legg was the
prime consultant for the master planning,
design, and construction for the
development of the 313-acre national
cemetery in Palm Beach County.
Miami-Dade County Parks,
Recreation & Open Spaces (PROS)
Kendall Soccer Park Turf
Replacement Survey - Miller Legg was
selected to provide topographic survey
services to Miami-Dade County for the
purposes of showing above-ground
improvements and tree locations for an
artificial turf replacement project on five
(5) soccer fields. The survey was
designed to show rim and invert
elevations, pipe and drainage structure
sizes.
Miami-Dade County Water and
Sewer Department (WASD) Pump
Station Improvement Program
(PSIP) No. 0331 Survey - Miller Legg
has performed surveying tasks for a
number of pump stations in Miami,
consisting of property boundary and legal
descriptions, topographic survey and
pump station data collection. This work
is being carried out under our Miami-
Dade Water and Sewer Department
(WASD) Pump Station Improvement
Program (PSIP) contract as part of the
CES Consultants design team, meeting
both County and municipal survey
requirements. The PSIP is part of the
ongoing upgrade of the County
wastewater collection and transmission
system to bring all pump stations into
compliance with the specified average
pump operating time requirement. In
addition to surveying services, the firm
provides field utility coordination as well
as field validation of the proposed
improvements layout.
Page 85Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
4.3 Project Approach
Miller Legg has completed numerous
municipal, county, state and federal projects
ranging from neighborhood improvement
and redevelopment projects, educational
facilities site planning, cemeteries, neighborhood parks,
and golf course designs to aviation facilities, regional
water and sewer utilities, streetscapes, and streets and
highways.
Our approach to each project is best characterized by
a “partnering relationship.” We dedicate ourselves to
learning the culture of our clients, their specific concerns,
desires and needs, much like an extension of their own
offices. We consistently strive to maintain time schedules
and to provide factual and frequent communication.
Our Approach and Methods for handling projects are
outlined in further detail in the following sections:
Our City of Sunny Isles Beach Team is headed by
licensed landscape architecture professionals. These
professionals have been specifically selected for this
Continuing Services Contract based upon their areas of
specialization and their experience with municipal and
public projects.
Our Team’s Project Manager, Brian Shore, RLA, will be
the primary point of contact for City staff involved in
the projects generated under this consulting services
contract. Brian has 22 years of professional landscape
architecture experience in the design, permitting, and
construction of land development projects in South
Florida. He has been managing multi-disciplinary projects
and has successfully completed numerous projects
for public and municipal clients. Brian is assisted by
Miguel Juncal, RLA, CA who will lead this service effort
as Assistant Project Manager and the lead Landscape
Architect for this Contract. Miguel has over 18 years
PROJECT MANAGEMENT
THE MILLER LEGG APPROACH
of Miami-Dade County municipal project experience.
They are supported by Michael Kroll, RLA, FASLA, as
Principal-in-Charge as well as Miller Legg’s full Landscape
Architecture department.
Details of the individual skills and accomplishments of
the key professionals on our Team for this contract are
outlined in their Resumes and Firm Qualifications.
Miller Legg’s corporate tagline, “Improving Communities.
Creating Environments.”, clearly describes our design
philosophy, which is utilized in our extensive portfolio
of municipal streetscape, park, and open space facility
projects. With 57 years of experience, Miller Legg has led
significant public involvement efforts, carried out required
regulatory agency permitting, coordinated bidding
activities and conducted construction administration
efforts. Our design philosophy ensures the City’s vision,
in correlation with the desires of the stakeholders, the
existing natural and built environments, as well as a
project’s sustainability and maintenance requirements.
DESIGN PROCESS
When addressing any landscape architecture project,
Miller Legg evaluates the project using a select method
of steps to achieve the highest quality deliverables for
our clients. The Firm’s typical project design process is
outlined as:
1. Evaluation of Existing Conditions
2. Collaboration with Stakeholders
3. Design Stage
4. Preparation of Construction Documents
5. Implementation and Construction
Evaluation of Existing Conditions:
This step establishes the project’s pre-existing
constraints and improvement opportunities. Prior to
design, we review existing infrastructure, community
Page 86Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
4.3 Project Approach
content, pedestrian / vehicular use, climate, adjacent
improvements, linkages and project’s relationship to the
City’s vision. These conditions are noted and graphically
prepared to identify relational and spatial opportunities
for the project design. Existing on-site improvements are
analyzed for condition and potential impact upon future
enhancements. We also assess the project site so that any
inconspicuous conditions are uncovered prior to design
efforts being undertaken. Other considerations are:
Code Requirements and Identification and Formulation
of Improvement/Enhancement Opportunities: Analysis
of recreational/open space viability, linkages to adjacent
spaces or circulation routes and accessibility from a
transportation perspective.
Collaboration with Stakeholders:
Throughout the project and design phases, Miller Legg
will maintain continual communication with stakeholders,
soliciting their input on the design and process. This helps
to establish the City’s, stakeholders’, and other users’
desires for the project, and outlines the project program
clearly for all parties involved. The City of Sunny Isles
Beach community has very active stakeholders whose
input and support will be key to the any project’s success.
Design Stage:
In this third step, Miller Legg incorporates the analysis
from the site evaluation, and combines that information
with the stakeholder desires to develop the theme
composition and material selection. We provide design
documents in 3 phases, Conceptual, Preliminary, and
Final. The Conceptual Design is a quick graphic format,
to visually communicate the overall design intent
and potential project site opportunities. Miller Legg
will review concepts with the City to receive input on
overall design intent. Our multi-disciplinary collaborative
approach includes the Landscape Architectural Team
reviewing concepts with Environmental, Planning, and
Transportation / Engineering members to ensure that
the concepts are truly “feasible.” This is necessary
because concepts presented to The City and the
MILLER LEGG’S CORPORATE TAGLINE,
“IMPROVING COMMUNITIES.
CREATING ENVIRONMENTS.”,
CLEARLY DESCRIBES OUR DESIGN
PHILOSOPHY, WHICH IS UTILIZED
IN OUR EXTENSIVE PORTFOLIO
OF MUNICIPAL STREETSCAPE,
PARK, AND OPEN SPACE FACILITY
PROJECTS.
project’s stakeholders, need to be truly achievable
project designs. Preliminary and Final Design Phase are
developed upon City’s acceptance of a project concept.
Preliminary design documents are prepared, including
the designation of general material types for various
hardscape and landscape elements and infrastructure
improvements.
Anticipated improvements will also be identified and
presented, accurately scaled to demonstrate true spatial
relations. A preliminary opinion of probable cost is
generated to identify appropriate/available budgets for
proposed enhancements. If the anticipated costs exceed
the project budget, design modifications are addressed
at this stage, rather than during the construction
document phase.
Preparation of Construction Documents:
Construction documents, what the Contractor will use to
construct the project, are prepared in accordance to the
specifications outlines in the Final Design.
Implementation and Construction:
A key role for the designer, in this case, Miller Legg, is
to provide contract administration and construction
observation services to ensure the design is being
implemented by the contractor in the way the City
desires and Miller Legg intended. Miller Legg will
conduct a review meeting with the City of Sunny
Isles Beach and associated review agencies, prepare
and distribute meeting minutes, so that appropriate
parties are aware of issues to be addressed in future
submittals. As construction documents continue to
move through the development process, updated
opinions of probable costs are also prepared at each
submittal stage. When construction documents are at an
appropriate percentage of completion, and comply with
City budgets, the permitting process commences. Our
Page 87Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
4.3 Project Approach
in-house engineering and environmental services assist
in strategically moving a project through permitting
processes.
Contract Administration / Bidding Assistance Phase:
The Miller Legg Team will assist the City in preparation
and clarification of questions related to bid documents
by incorporating technical and design documents with
standard City contract documents and conditions.
Technical addendum during the bidding process can also
be facilitated and prepared by the Miller Legg Team. As
needed, Miller Legg will assist the City during the bid
opening to tabulate the submitted bids, evaluate the
bids for the appropriate responsiveness and document
the rankings of the bidders.
Construction Observation Phase: Miller Legg will
assist the City in the observation and documentation
required during construction to ensure that the project
construction activities move forward as promptly
as possible, while minimizing coordination activities
between the City and contractor. This is facilitated by
Miller Legg’s Team assisting the contractor in interpreting
the design intent and construction documents. During
construction, Miller Legg concisely documents all
activities and key decisions or status changes that are
observed during these activities with field reports, which
are submitted to the City for review and documentation.
This documentation is critical to ensure that each project
meets schedules, and to avoid potential litigation/claims
issues. The Firm provides construction observation
services for all our projects and has experienced
professionals who specialize in construction inspection.
Miller Legg commits to the continuous availability of
resources required to design, permit and coordinate
the projects in accordance with the terms of this
Continuing Services for Landscape Architectural Services
THE MILLER LEGG TEAM HAS
SUBSTANTIAL EXPERIENCE IN
SUCCESSFULLY COMPLETING
SIMILAR PROJECTS ON AN
EXPEDITED SCHEDULE AND
WITHIN BUDGET.
contract and each project schedule. The members of our
professional Team will be made available on an on-going
and as-needed basis to contribute to the required tasks
and will devote the necessary time needed to complete
the project on time and within budget.
PROJECT PLANNING & SCHEDULING
As Miller Legg’s Project Manager, Brian Shore, RLA
will conduct project kick-off sessions with Team
members to discuss and review project objectives,
client’s expectations, scopes and deliverables, budgets,
schedules, constraints and limitations, background and
other available information and guidelines for internal
coordination, documentation and quality control/
assurance procedures. Depending upon the length and
/ or complexity of the project, status meetings will be
held with the City’s Project Manager to review project
goals, milestones, and delivery dates. In addition, we
recommend a close-out meeting with City staff to review
our Team’s execution of the project to ensure consistent
performance or make adjustments to be applied to
future work, if needed.
For projects that require permits, we will proactively set
up a review meeting with the permitting agency(ies) prior
to their review cycle being completed to help address
unnecessary comment letters and / or get a jumpstart on
the response if any revisions may be necessary.
Our Project Managers use Plantrax and/or Microsoft
Project applications to prepare a detailed schedule of
each milestone completion. This schedule is developed
with input from every member of the Consultant and
Client Teams to ensure commitment to the schedule.
For each project effort, this timetable is completed upon
Notice to Proceed and is transmitted to the Client Project
Manager for review and acceptance. The process is
tracked and updated as necessary. The Project Manager
maintains and keeps all Team members on schedule. At
BUDGET & SCHEDULING
Page 88Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
4.3 Project Approach
our weekly department meetings, the priority projects
for the week are discussed and staffing coordination is
planned.
FAST TRACK / EXPEDITED BASIS
With Miller Legg’s 57 years of municipal experience, our
Team has the right ability and approach to handle the
various tasks specified on a fast track or expedited basis.
The Team has a strong understanding of the potential
concerns that may arise during the life of projects
under this Contract, and has worked with numerous
communities clarifying and effectively implementing and
resolving these and other similar issues in the course of
our past projects. There will be no learning curve due to
Miller Legg’s current and past experience.
Miller Legg has recently completed numerous landscape
architecture projects on an expedited basis including
landscape architecture, hardscape and irrigation design
for the City of Miami Beach 20th Street & Sunset Drive
Pocket Park, the City of Miami Armbrister Park Community
Center, and the City of Tamarac’s Commercial Boulevard
landscape, hardscape and irrigation improvement
project.
The Miller Legg Team has tremendous depth with built in
redundancy to handle multiple projects at the same time
under this Contract. The Team has had many successes
teamed together with public clients within South Florida.
We also draw upon statewide and national experience to
expedite and perform the specific tasks outlined in the
Scope of Services for City of Sunny Isles Beach Landscape
Architectural contract as follows:
• Provision of signed and sealed drawings and
specifications for landscaping construction
projects
• Develop bid specification for landscape
maintenance services
• Site master planning, analysis and design
• Urban design plans/concept diagrams
• Open space planning, analysis and design
• Development of design guidelines
• Development of Maintenance Standards
• Perform landscape maintenance service
inspections
• Renderings
• Beach and Dunescaping
• Active and Passive Park Design
• Irrigation Design, Operation and Maintenance
• Median and Swale Landscaping Design
• Streetscape planning, analysis and design
• Natural resource planning, analysis and design
• Cost estimates
• Provide plans developed on AutoCAD’s latest
version, and copies of a reproducible hard copy
and CD of plans to the City
• Feasibility analysis
• Peer review analysis
• Construction phase services including site
inspections
• Building Department plan and permit review
• Permit assistance
• Tree surveys
• RER tree removal permitting
• Attendance at meetings with City staff and
presentations to City Commission
• Provide construction administration if requested
by the City
• Prepare and submit signed and sealed construction
drawings
COST CONTROL
We have several methods for ensuring that our designs
remain within the Project Cost Budget that the City
establishes. First, we uphold the project budget through
strict observance of the project schedule and our quality
assurance program because design flaws and delays
usually result in construction cost overruns. Second, we
complete a preliminary construction cost estimate at
every submittal to check if our design is within the cost
requirements or if value engineering alternatives can be
incorporated without impacting the purpose set forth by
the City. Third, changes in scope or design direction will be
discussed with you to ensure that everyone understands
the ramifications of that change on the construction cost
budget. This attention to detail in our processes is the
core of Miller Legg’s value engineering efforts.
Constructability reviews and an understanding of the
time needed for the construction to be completed allow
us to guide the City in detailing these constraints in the
contract documents. This ensures the schedule during
Page 89Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
4.3 Project Approach
construction is realistic and accomplishable without
incurring acceleration costs or that these acceleration
costs have been anticipated in the cost estimates where
the need for expedited construction outweighs the
higher costs associated.
Finally, contractor-initiated value engineering options are
thoroughly reviewed and discussed with our clients. It is
critical to ensure that the quality and functionality of the
project is not sacrificed by these requested changes and
that consequential changes such as permit modifications
are factored into a value engineering proposal to fully
assess the benefits and potential pitfalls if the proposal
is accepted.
Miller Legg is committed to our Quality Control (QC)
Program where our QC manager, William
Schipske, reviews all work to ensure
it meets high quality standards.
Our Project Manager has 39
years of considerable experience
managing complex, multiple
task projects. As such, Miller
Legg is committed to producing
cost-efficient and high-quality
deliverables through significant
quality control procedures. Miller Legg has
established a seven-stage quality assurance process. The
seven (7) stages are interrelated in a sequence, which
forms the quality control process logic.
1. Preparation of a project initiation form
2. Project kick-off meeting
3. Weekly Project Manager meetings
4. Project status & progress meetings
5. Draft deliverable review
6. Final deliverable review & delivery to client
7. Conducting post project debriefing & project
close out
1. Project Initiation Form - The quality control process
begins with the completion of a project initiation form.
A project initiation form is prepared after the cost
proposal has been negotiated and a contract has been
executed. It must be reviewed by a Principal in the firm
and submitted to the Department Manager for approval
before it is distributed.
The objectives of the project initiation form include the
following:
• Determine the contract type
• Provide information such as the project location,
methods of invoicing, and financial components of
the project (labor, expenses, subcontracts, etc.)
• Classify the project into the types of services being
provided
The preparation of the project initiation form ensures
that the Contract has been executed and the budget and
schedule has been prepared. It also establishes a point of
contact for invoicing.
2. Project Kick-Off Meeting - Upon approval and
distribution of the scope, budget and schedule, the
project kick-off meeting is convened. Every project Team
member comes to the meeting with questions and/or
suggestions aimed at enhancing specific or all aspects
of the project implementation process and leaves the
meeting fully cognizant of their roles on the project
Team – how their professional development and growth
is enhanced by the tasks assigned to them, as well as
how their performance on the project can be evaluated.
Every Team member assigned a task(s) ensures that the
resources needed to execute the task(s) are accounted
for and provided. Report titles, their preparers,
schedules, as well as peer reviewers are identified. In
the case of statutory reports, the table of contents
may already have been specified under the governing
regulations. Similar details are established for studies
and construction documents.
3. Project Status/Progress Meetings - Depending on the
size, complexity, and client requirements, regular status/
progress meetings may be necessary during the life of the
project. It is Miller Legg’s policy to hold regular (monthly)
progress meetings at which all project Team members
report on the progress of their activities, and the status
QUALITY ASSURANCE / QUALITY CONTROL
Page 90Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
4.3 Project Approach
of scheduled deliverable preparation. This is the time
when, if applicable, construction plans are reviewed
for compliance with design standards, Americans with
Disabilities Act (ADA) regulations, constructability, and
neighborhood concerns.
4. Weekly Project Managers Meetings - Miller Legg has
instituted weekly Project Manager meetings to review,
assess and resolve short-term staffing situations, balance
staff utilization and discuss general project related
activities including invoicing, scheduling and deliverable
issues.
5. Draft Deliverable Scheduling & Review - The draft
deliverable may range from a Certified Arborist
assessment/report to a set of landscape architecture
design plans but should contain all pertinent information
and data to make the deliverable complete. Miller Legg
schedules necessary time to allow stakeholders to have
an opportunity to comment on the deliverable draft.
6. Final Deliverable Scheduling & Review - In some cases,
the deliverable may need to be submitted to the client,
or outside agencies as “draft” for review comments
before the final deliverable is issued. After incorporating
the client’s comments, the final deliverable is issued for
final release.
7. Post Project Debriefing/Project Closeout - After
submitting the final deliverable to the client or the client’s
designated depository, Brian Shore, RLA, as Project
Manager, will schedule a post-project debriefing session
with the project Team. The debriefing session considers
all stages and all aspects of the project, such as:
• Individual and subcontractor performance (if
applicable)
• Technical difficulties and their resolution
• Regulatory and outside interfaces,
• Lessons learned
• Modifications needed
• Budgetary considerations
• Invoicing issues
• Accounts receivable and profit/loss issues
• Scheduling issues
• Most particularly, individual and collective
assessment / evaluation of the project
implementation process and recommendations.
The Project Manager will share the client’s comments with
the Team and seeks to get the client’s final assessment in
writing, as this may be useful in other projects as well
as evaluating the project performance and Team. This
session closes out the project.
Miller Legg works with municipalities and other
governmental agencies on projects for neighborhood
infrastructure improvements and redevelopment
projects, parks and recreational facilities, streetscapes,
roadway and transportation projects, as well as
healthcare, educational and aviation facilities. In
addition, Miller Legg provides plan review services for
traffic improvements as well as landscape architecture
projects for numerous municipalities and the FDOT.
From this experience, the Miller Legg Team works daily
with public officials and stakeholders on a variety of
projects and understands their needs for concise and
timely information.
Understanding that the City of Sunny Isles Beach projects
will reflect multi-use demographics including residential,
retail and commercial, it is essential that public
awareness/outreach begins early in the design phase
and is multi-faceted in its approach to reach all impacted
stakeholders and build relationships and trustworthiness
with the community. Our existing relationships with
Cities, Counties, and other officials locally across South
Florida provide us unique access to key stakeholders,
and knowledge of existing concerns and issues that may
impact the project.
Goals of communication:
1. Actively inform and educate the community about
the projects: process, timeline, expectations, and
how problems can be solved or prevented.
2. Promote the benefits of improvements to the
entire stakeholder community.
PUBLIC INVOLVEMENT
Page 91Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
4.3 Project Approach
3. Provide multiple and diverse means of
communication, to reach the broadest base of the
impacted stakeholder community.
The Miller Legg Team has experience, both globally and
locally, in projects that heavily affect the public. Our
intent is to mitigate any negative impact to surrounding
businesses and identify strategies that will allow them to
continue operating as efficiently as possible. Our Team
recognizes the need to proactively inform property
owners and others of the benefits of the project along
with subsequent construction impacts. Performing
proper due diligence in order to understand the
demographics and concerns of the community is critical
to ensuring work progresses without costly delays. To
facilitate this, our Team will closely coordinate with City
officials and all other necessary individuals.
We have successfully implemented these procedures
on several projects, including the City of Miami La
Pastorita Neighborhood Roadway Improvements
Study, City of Miami Biscayne Boulevard Streetscape,
City of Miami Fairlawn Community Park, South Miami
Parks and Recreation Master Plan, Miami-Dade Aviation
Department (MDAD) Central Boulevard Landscape
Master Plan and numerous FDOT projects.
COMMUNICATION & REPORTING
Communication and the ability to establish efficient
coordination between the City and the Miller Legg Team
will be key to successful execution of projects anticipated
under this Continuing Services Contract. Our Project
Manager will utilize formal submittals of documents,
face-to-face, telephone and email communication as
appropriate for the type of issue to be communicated
during the span of a project. At the commencement of
this contract, Miller Legg will provide the City of Sunny
Isles Beach with contact information for key personnel,
including phone numbers, cellular phone numbers and
email addresses to allow the best possible access to the
people doing the work.
We also know that proper communication of
expectations and progress throughout the life of each
project is the cornerstone to building trust. Because
the complexity and duration of task assignments often
dictate the level of communication warranted, we will
work with the City Project Manager(s) and staff to tailor
our reporting structure for each task order to meet your
expectations. Our Team is available to work extended
hours as necessary to complete each project task on
schedule and within budget.
TECHNICAL
Utilization of the right software is crucial to communicate
the projects design intent to the audience. Miller Legg has
full capabilities to develop all levels of computer aided
design (CAD), including the current versions of AutoCAD,
Microstation, Land FX and Impression. In addition, the
Firm utilizes graphic software to generate the exhibits
necessary to communicate a project’s intent using
Lumion, ESRI (GIS) SketchUp, Adobe Creative Suite and
Maxwell Render software. We have successfully utilized
these resources to prepare community involvement,
design and permitting documents for current and past
RESOURCES
Lumion 3D Rendering
Page 92Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
4.3 Project Approach
projects at the City of Miami’s Moore Park, Kennedy Park
and Morningside Park projects, and most recently for
the design improvements of the City of Coral Gables War
Memorial Park project.
ADDITIONAL IN-HOUSE CAPABILITIES
As mentioned earlier in our qualifications, Miller Legg is
a statewide award-winning consulting firm that brings
together the elements of landscape architecture,
planning, engineering, surveying, environmental
wetlands consulting, and geographic information
systems services.
For this Landscape Architecture Consulting Services
contract, Miller Legg has proposed utilizing our in-
house capabilities of landscape architects and designers.
The firm’s landscape architecture services include:
recreational and commercial planning, hardscape,
irrigation, urban design, streetscape, planting,
project theming, signage & graphic design, contract
administration, construction observation services, plan
review, horticultural consulting and arboriculture. The
firm’s arborist consulting services include: tree species
identification/ inventories, tree surveys and mapping,
destroyed/damaged tree assessments and value
estimates, tree grading, tree species selection, mangrove
trimming oversight and tree permitting. We have been
recognized as the premiere landscape architectural
firm for municipal and private sector facilities and have
received dozens of awards in support of this.
Supporting service staff, including certified arborists,
certified landscape inspectors, environmental specialists
lighting engineers and technicians, as well as surveyors
and survey technicians/SUE staff will also be at hand to
assist in achieving the objectives and scope of services for
this consulting Contract for the City. In addition to these
services mentioned above, Miller Legg has significant in-
house experience in South Florida providing, Planning,
Civil Engineering, Traffic Engineering, Plans Review, and
GIS.
Many of the representative landscape architecture
projects included in our projects experience listing
also include civil engineering, traffic, planning and
environmental components.
We are committed to providing the City of Sunny
Isles Beach an unmatched quality service.
Award winning Biscayne Boulevard Streetscape (FDOT) District 6, Miami, FL
Page 93Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
4.4 Florida Statute 287.055 Certified Minority Business Enterprise Certification
Although Miller Legg is not a Certified Minority Business
Enterprise as defined by the Florida Small and Minority
Business Assistance Act, we are a Federal Small Business
Florida Department of Transportation.
As part of Miller Legg’s
Affirmative Action Plan,
there is an established
commitment to utilize
minority and women-
owned companies in the
normal course of our
business, which includes
Small Disadvantaged
Business Enterprises (SDBEs) as
subconsultants, and as suppliers
of goods and services. More than 57% of our own staff
includes minorities and women. The company maintains
an extensive list of teaming partners, including minority-
owned businesses in Miami-Dade, Broward and Palm
Beach Counties. We often exceed required goals and
provide subconsultant diversity monitoring reports to
regulatory agencies as required.
Miller Legg teams or has teamed with the following
minority-owned businesses in Miami-Dade, Broward &
Palm Beach Counties:
Black-owned businesses
•Brown & Phillips, Inc. (Surveying) – Palm Beach
•Dickey Consulting Services, Inc. (Public/
Government Relations) - Broward
•EAC Consulting, Inc. (Engineering) – Miami-Dade &
Broward
•Gator Engineering, Inc. (Engineering) – Broward
•EBS Engineering (Engineering) – Miami-Dade
Hispanic-owned businesses
•BCC Engineering, Inc. (Engineering) – Miami Dade
•Basulto Management Consultants (Engineering) –
Broward County
•Bolton Perez & Associates (Engineering) – Miami
Dade
•Borrelli & Partners (Architecture) – Miami-Dade
•Delta G Consulting Engineering, Inc. (Structural
Engineering) – Broward
•Milian Swain & Associates (Engineering) – Miami-
Dade
•Ocampo & Associates, Inc. (Architecture) –
Broward
•R.J. Behar & Company, Inc. (Engineering) – Miami-
Dade & Broward
•Tierra Florida, Inc. (Geotechnical Engineering) –
Palm Beach
•CES Consultants, Inc. (Engineering) – Miami-Dade
•CH Perez & Associates (Engineering & Traffic) –
Miami-Dade
•AES Engineering, Inc. (Engineering) – Miami-Dade
•A&P Consulting Transportation Engineers
(Engineering) – Miami-Dade
•ATEC Transportation (Engineering) – Miami-Dade
•Pevida Highway Designers (Engineering) – Miami-
Dade
Woman-owned businesses
•Southern Resource Mapping (Mapping/
Photogrammetry) – Miami-Dade
•Holland Engineering (Engineering) - Broward
•Garth Business Solutions (Community Outreach) -
Broward
•Nova Consulting, Inc. (Engineering) – Broward
•Masuen Consulting (Irrigation) - Broward
•Ross Engineering (Engineering) – Broward
•AirQuest Environmental (Environmental) –
Broward
Page 94Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
4.5 Past Performance - References
City of Tamarac | Roadway Landscape Master Plan
Robert Johnson
City Planner
7525 NW 88th Avenue
Tamarac, FL 33321
Robert.Johnson@tamarac.org
954.597.3533
City of Oakland Park | East Dog Park
Sierra Marrero
Assistant Director of Engineering and Building Services
5399 N. Dixie Highway, Suite 3
Oakland Park, FL 33334
sierra.marrero@oaklandparkfl.gov
954.630.4479
Miami-Dade County Parks, Recreation & Open Space
(PROS) | Equitable Distribution Program Continuous
Professional Services Agreement
Hong Yun, RLA, LEED AP
Landscape Architect
275 NW 2nd Avenue, 4th Floor
Miami, FL 33128
hongbum.yun@miamidade.gov
305.755.7922
Additional references for your consideration:
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA Page 955. Contract forms
Page 96Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
5. Contract Forms
City of Sunny Isles Beach | 25
SECTION 6
BID FORM 1
RFP Title: LANDSCAPE ARCHITECT SERVICES
The undersigned Vendor proposes and agrees, if this Bid is accepted, to enter into an agreement with The City of
Sunny Isles Beach to perform and furnish all Services as specified or indicated in the Contract Documents for the
Contract Price and within the Contract Time indicated in this Bid and in accordance with the other terms and
conditions of the Contract Documents.
The vendor accepts all of the terms and conditions of this RFQ and Instructions to Vendors. This RFQ will
remain subject to acceptance for 90 days after the day of RFQ opening. The Proposer agrees to sign and
submit the Agreement with other documents required by the Bidding Requirements within ten days after the
date of the City’s Notice of Award.
In submitting this RFQ, the Vendor represents, as more fully set forth in the Agreement, that:
The Vendor has familiarized himself/herself with the nature and extent of the Contract
Documents, Work, site, locality, and all local conditions and Law and Regulations that in
any manner may affect cost, progress, performance, or furnishing of the Work.
The Vendor has given the City written notice of all conflicts, errors, discrepancies that it
has discovered in the Contract Documents and the written resolution thereof by City is
acceptable to the Vendor.
This RFQ is genuine and not made in the interest of or on behalf of any undisclosed
person, firm or corporation and is not submitted in conformity with any agreement or
rules of any group, association, organization, or corporation; the vendor has not directly
or indirectly induced or solicited any other Vendor to submit a false or sham RFP; the
vendor has not solicited or induced any person, firm or corporation to refrain from
Bidding; and vendor has not sought by collusion to obtain for itself any advantage over
any other Vendor or over the City.
The Proposer understands and agrees that the Bid is for unit prices to furnish and install individual Work Items
for maintenance and/or repair work, complete in place. Estimates are provided for the purposes of Bid Evaluation
and to establish unit prices for individual Work to be contracted by the City under individual Purchase Orders,
based on the unit prices established under this RFQ.
The City and the successful Proposer will establish completion times for each individual Work Item and the
successful Proposer agrees that the work will be completed within the time frames agreed upon and stipulated
in the individual Purchase Orders and/or Notice to Proceed.
Page 97Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
City of Sunny Isles Beach |
Firm Name:
_____________________________________________________________________________
Street Address:
_____________________________________________________________________________
Mailing Address (if different):
_____________________________________________________________________________
Telephone No. _______________________________ Fax No. _________________________
Email Address: _______________________________ FEIN No. __/__-__/__/__/__/__/__/__
*“By signing this document the bidder agrees to all Terms and conditions of this Request for
Qualifications.
Signature:
__________________________________________________________________
(Signature of authorized agent)
Print Name: ____________________________________
Title: _________________________________________
THE EXECUTION OF THIS FORM CONSTITUTES THE UNEQUIVOCAL OFFER OF PROPOSER TO BE
BOUND BY THE TERMS OF ITS PROPOSAL. FAILURE TO SIGN THIS SOLICITATION WHERE
INDICATED ABOVE BY AN AUTHORIZED REPRESENTATIVE SHALL RENDER THE PROPOSAL NON-
RESPONSIVE. THE CITY MAY, HOWEVER, IN ITS SOLE DISCRETION, ACCEPT ANY PROPOSAL THAT
INCLUDES AN EXECUTED DOCUMENT WHICH UNEQUIVOCALLY BINDS THE PROPOSER TO THE
TERMS OF ITS OFFER.
Miller Legg
1845 NW 112th Avenue, Suite 211, Miami, FL 33172
Same as above
305.599.6381 954.493.6539
mkroll@millerlegg.com 6 5 0 5 6 3 4 6 7
Michael D. Kroll, RLA, FASLA
President
5. Contract Forms
Page 98Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
City of Sunny Isles Beach |Request for Qualifications No. 22-06-01 26
ACKNOWLEDGEMENT OF ADDENDA
INSTRUCTIONS: COMPLETE PART I OR PART II, WHICHEVER APPLIES
PART I:
LIST BELOW ARE THE DATES OF ISSUE FOR EACH ADDENDUM RECEIVED IN CONNECTION WITH THIS RFQ
Addendum #1, Dated
Addendum #2, Dated
Addendum #3, Dated
Addendum #4, Dated
Addendum #5, Dated
Addendum #6, Dated
Addendum #7, Dated
Addendum #8, Dated
PART II:
NO ADDENDUM WAS RECEIVED IN CONNECTION WITH THIS RFQ
FIRM NAME:
AUTHORIZED SIGNATURE: DATE:
TITLE OF OFFICER:
Miller Legg
Michael D. Kroll, RLA, FASLA, President
6/29/22
5. Contract Forms
Thursday, June 23, 2022
Page 99Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
5. Contract Forms
1 of 8
NON-COLLUSION AFFIDAVIT
City of Sunny Isles Beach
18070 Collins Avenue
Sunny Isles Beach, FL 33160
Telephone: (305) 947-0606 Fax: (305) 949-3113
STATE OF FLORIDA )
)
COUNTY OF _____________)
The undersigned being first duly sworn as provided by law, deposes, and says:
This Affidavit is made with the knowledge and intent that it is to be filed with the City of Sunny Isles Beach City Commission and that it will be
relied upon by said County, in any consideration which may give to and any action it may take with respect to this Bid.
The undersigned is authorized to make this Affidavit on behalf of,
_____________________________________________________________
(Name of Corporation, Partnership, Individual, etc.)
a, ________________________________, formed under the laws of _____________
(Type of Business) (State)
of which he is ________________________________________________.
(Sole Owner, Partner, President, etc.)
Neither the undersigned nor any person, firm, or corporation named above nor anyone else to the knowledge of the undersigned, have
themselves solicited or employed anyone else to solicit favorable action for this Bid by the City, also that no head of any department or
employee therein, or any officer of the City of Sunny Isles Beach, Florida is directly interested therein.
This Bid is genuine and not collusive or a sham; the person, firm or corporation named above has not colluded, conspired, connived or agreed
directly or indirectly with any proposers or person, firm or corporation, to put in a sham Bid, or that such person, firm or corporation, shall
refrain from Bidding, and has not in any manner, directly or indirectly, sought by agreement or collusion, or communication or conference with
any person, firm or corporation, to fix the prices of said Bid or Bids of any other proposers; and all statements contained in the Bid or Bids
described above true; and further; neither the undersigned, nor the person, firm or corporation named above has directly or indirectly
submitted said Bid or the contents thereof, or divulged information or data relative thereto, to any association or to any member or agent
thereof.
___________________________________ ___________________________________
AFFIANT’S NAME AFFIANT’S TITLE
TAKEN, SWORN AND SUBSCRIBED TO BEFORE ME this _____ day of _______________________, 20 _.
Personally Known ________ or Produced Identification ________;
Type of identification ___________________________________
(Affix seal here)
___________________________________
NOTARY PUBLIC (name printed or typed)
Miami-Dade
Miller Legg
Corporation Florida
President
Michael D. Kroll, RLA, FASLA President
29 June 22
X
Marina Hannwacker
Page 100Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
2 of 8
PUBLIC ENTITY CRIMES
City of Sunny Isles Beach
18070 Collins Avenue
Sunny Isles Beach, FL 33160
Telephone: (305) 947-0606 Fax: (305) 949-3113
SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a)
FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES
PUBLIC ENTITY CRIMES
Pursuant to the provisions of paragraph (2) (a) of Section 287.133, Florida State Statutes - "A person or affiliate
who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a
Bid on a Contract to provide any goods or services to a public entity, may not submit a Bid on a Contract with a
public entity for the construction or repair of a public building or public Work, may not submit Bids on leases of
real property to a public entity, may not be awarded to perform Work as a Contractor, supplier, Sub-Contractor, or
Consultant under a Contract with any public entity, and may not transact business with any public entity in excess
of the threshold amount Category Two of Sec. 287.017, FS for thirty six months from the date of being placed on
the convicted vendor list".
THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER
OFFICIAL AUTHORIZED TO ADMINISTER OATHS.
1.This sworn statement is submitted to City of Sunny Isles Beach _____________
by____________________________________________________________________________
[print individual’s name and title]
for____________________________________________________________________________
[print name of entity submitting sworn statement]
whose business address is:
_______________________________________________________________________________
_______________________________________________________________________________
and (if applicable) its Federal Employer Identification number (FEIN) is_____________________.
(If the entity had no FEIN, include the Social Security Number of the individual signing this sworn
statement:_________________________________.)
2.I understand that a "public entity crime" as defined in Paragraph 287.133(1)(g), Florida Statutes, means a
violation of any state or federal law by a person with respect to and directly related to the transaction of
business with any public entity or with an agency or political subdivision of any other state or with the
United States, including, but not limited to, any Bid or Contract for goods or services to be provided to any
public entity or an agency or political subdivision of any other state of the United States and involving
antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation.
3.I understand that "convicted" or "conviction" as defined in Para. 287.133(1)(b), Florida Statutes, means a
finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any
federal or state trail court of record relating to charges brought by indictment or information after July 1,
1989, as a result of a jury verdict, non-jury trial, or entry of a plea of guilty or nolo contendere.
4.I understand that an "affiliate" as defined in Para. 287.133(1)(a), Florida Statutes, means:
a.) predecessor or successor of a person convicted of a public entity crime; or
b.) Any entity under the control of any natural person who is active in the management of the entity
and who has been convicted of a public entity crime. The term "affiliate" includes those officers,
directors, executors, partners, shareholders, employees, members, and agents who are active in
the management of an affiliate. The ownership by one person of shares constituting a controlling
interest in another person, or a pooling of equipment or income among persons when not for fair
Michael D. Kroll, RLA, FASLA, President
Miller Legg
1845 NW 112th Avenue, Suite 211, Miami, FL 33172
65-0563467
5. Contract Forms
Page 101Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
3 of 8
market value under an arm's length agreement, shall be a prime facie case that one person
controls another person. A person who knowingly enters into a joint venture with a person who
has been convicted of a public entity crime in Florida during the preceding 36 months shall be
considered an affiliate.
5.I understand that a "person" as defined in Para. 287.133(1)(e), Florida Statutes, means any natural
person or entity organized under the laws of any state or of the United States with the legal power to
enter into a binding Contract and which Bids or applies to Bid on Contracts for the provision of goods or
services let by a public entity, or which otherwise transacts or applies to transact business with a public
entity. The term "persons" includes those officers, directors, executives, partners, shareholders,
employees, members, and agents who are active in management of any entity.
6.Based on information and belief, the statement which I have marked below is true in relation to the entity
submitting this sworn statement. (Indicate which statement applies.)
____ Neither the entity submitting this sworn statement, nor any of it's officers, directors, executives, partners,
shareholders, employees, members, or agents who are active in the management of the entity, nor any
affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1,
1989.
____ The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners,
shareholders, employees, members, or agents who are active in the management of the entity, or an
affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1,
1989.
____ The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners,
shareholders, employees, members, or agents who are active in the management of the entity, or an
affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1,
1989. However, there has been a subsequent proceeding before a Hearing Officer of the State of
Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer of the
State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer
determined that it was not in the public interest to place the entity submitting this sworn statement on the
convicted vendor list. (Attach a copy of the final order.)
I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE
PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 1 (ONE) ABOVE IS FOR THAT PUBLIC ENTITY ONLY AND,
THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED. I
ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO
A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA
STATUTES, FOR CATEGORY TWO OF ANY, CHANGE IN THE INFORMATION CONTAINED IN THIS FORM.
By:
______________________________________
(Signature)
______________________________________
(Printed Name)
______________________________________
(Title)
Sworn to and subscribed before me this ______ day of_______________________, 20_____, by
__________________________________________________.
(AFFIX NOTARY STAMP HERE) ______________________________________
Signature: Notary Public – State of Florida
______________________________________
Print or Type Commissioned Name
Personally Known __________ OR Produced Identification __________
Type of Identification Produced ________________________________
X
Michael D. Kroll, RLA, FASLA
President
29 June 22
Marina Hannwacker
X
5. Contract Forms
Page 102Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
4 of 8
EQUAL OPPORTUNITY /
AFFIRMATIVE ACTION
City of Sunny Isles Beach
18070 Collins Avenue
Sunny Isles Beach, FL 33160
Telephone: (305) 947-0606 Fax: (305) 949-3113
EQUAL OPPORTUNITY/AFFIRMATIVE ACTION STATEMENT
The contractors and all subcontractors hereby agree to a commitment to the principles and
practices of equal opportunity in employment and to comply with the letter and spirit of
federal, state, and local laws and regulations prohibiting discrimination based on race,
color, religion, national region, sex, age, handicap, marital status, and political affiliation or
belief.
Signed: ________________________________________
Title: ________________________________________
Firm: ________________________________________
Address: ________________________________________
________________________________________
President
Miller Legg
1845 NW 112th Avenue, Suite 211
Miami, FL 33172
5. Contract Forms
Page 103Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
5 of 8
C O N F L I C T O F I N T E R E S T
City of Sunny Isles Beach
18070 Collins Avenue
Sunny Isles each, FL 33160
Telephone: (305) 947-0606 Fax: (305) 949-3113
CONFLICT OF INTEREST STATEMENT
The award of any contract hereunder is subject to the provisions of Chapter 112, Florida State Statutes. Proposers
must disclose with their Bids, the name of any officer, director, partner, associate or agent who is also an officer or
employee of the City of Sunny Isles Beach or its agencies.
STATE OF FLORIDA
COUNTY OF ________________________
BEFORE ME, the undersigned authority, personally appeared __________________________________________ ,
who was duly sworn, deposes, and states:
1.I am the _________________________ of __________________________________________ with a local
office in ______________________________________________________________________ and principal office
in ___________________________________________________________________________________________.
2.The above named entity is submitting a proposal for the City of Sunny Isles Beach, RFQ No.
_________________ described as _________________________________________________________. The
Affiant has made diligent inquiry and provides the information contained in this Affidavit based upon his own
knowledge.
3.The Affiant states that only one submittal for the above Bid is being submitted and that the above named
entity has no financial interest in other entities submitting Bids for the same project.
4.Neither the Affiant nor the above named entity has directly or indirectly entered into any agreement,
participated in any collusion, or otherwise taken any action in restraints of free competitive pricing in connection
with the entity’s submittal for the above Bid. This statement restricts the discussion of pricing data until the
completion of negotiations if necessary and execution of the Contract for this project.
5.Neither the entity nor its affiliates, nor anyone associated with them, is presently suspended or otherwise
ineligible from participation in contract letting by any local, State, or Federal Agency.
6.Neither the entity, nor its affiliates, nor anyone associated with them have any potential conflict of
interest due to any other clients, contracts, or property interests for this project.
7.I certify that no member of the entity’s ownership or management is presently applying for any employee
position or actively seeking an elected position with the City of Sunny Isles Beach.
8.I certify that no member of the entity’s ownership or management, or staff has a vested interest in any
aspect of the City of Sunny Isles Beach.
9.In the event that a conflict of interest is identified in the provision of services, I, on behalf of the above
named entity, will immediately notify the City of Sunny Isles Beach.Dated this __________ day of __________________________________, 20____.
____________________________________________ ____________________________________
AFFIANT Print or Type Name and Title
Sworn to and subscribed before me this __________ day of ______________________________, 20____.
Personally Known, OR
Produced Identification - Type of Identification ____________________________________________
NOTARY PUBLIC STATE OF FLORIDA _______________________________________________________
Miami-Dade
Michael D. Kroll, RLA, FASLA
President Miller LeggMiami
Fort Lauderdale
22-06-01 Continuing Services for Landscape Architectural Services CCNA
29th June 22
Michael D. Kroll, RLA, FASLA, President
29th June 22
X
5. Contract Forms
Page 104Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
6 of 8
DISPUTE DISCLOSURE
City of Sunny Isles Beach
18070 Collins Avenue
Sunny Isles Beach, FL 33160
Telephone: (305) 947-0606 Fax: (305) 949-3113
DISPUTE DISCLOSURE FORM
Answer the following questions by placing a “X” after “Yes” or “No”. If you answer “Yes”, please
explain in the space provided, or on a separate sheet attached to this form.
1.Has your firm or any of its officers, received a reprimand of any nature or been suspended by the
Department of Professional Regulations or any other regulatory agency or professional associations within the last
five (5) years?
YES __________ NO __________
2.Has your firm, or any member of your firm, been declared in default, terminated or removed from a
contract or job related to the services your firm provides in the regular course of business within the last five (5)
years?
YES __________ NO __________
3.Has your firm had against it or filed any requests for equitable adjustment, contract claims, Bid protests,
or litigation in the past five (5) years that is related to the services your firm provides in the regular course of
business?
YES __________ NO __________ If yes, state the nature of the request for equitable adjustment, contract
claim, litigation, or protest, and state a brief description of the case, the outcome or status of the suit and the
monetary amounts of extended contract time involved.
I hereby certify that all statements made are true and agree and understand that any misstatement or
misrepresentation of falsification of facts shall be cause for forfeiture of rights for further consideration of this Bid
for the City of Sunny Isles Beach.
________________________________________ ______________________________________
Firm Date
________________________________________ _______________________________________
Authorized Signature Print or Type Name and Title
X
X
X
Miller Legg June 29, 2022
Michael D. Kroll, RLA, FASLA
5. Contract Forms
Nature of claim: Alleged economic loss
Amount in dispute: Confidential amount within the Professional Liability insurance limits
Parties: Isles of Oviedo Townhomes Owners’ Association / Miller Legg
Case Number: Seminole County 2020-CA-001243-11E-L
Status: In Litigation
*see below
Page 105Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
7 of 8
ANTI-KICKBACK
City of Sunny Isles Beach
18070 Collins Avenue
Sunny Isles Beach, FL 33160
Telephone: (305) 947-0606 Fax: (305) 949-3113
ANTI-KICKBACK AFFIDAVIT
STATE OF FLORIDA )
)
COUNTY OF ___________ )
I, the undersigned, hereby duly sworn and deposed say that no portion of this sum herein Bid
will be paid to any employees of the City of Sunny Isles Beach or its elected officials as a
commission, kickback, reward or gift, directly or indirectly by me or any member of my firm or
by an officer of the corporation.
By: ________________________________
Title: ________________________________
The foregoing instrument was acknowledged before me this _____ day of
__________________, 20____, by _________________________________________ [name
of person], as __________________________________ [type of authority], for
________________________________ [name of party on behalf of whom instrument was
executed].
AFFIX NOTARY STAMP HERE:
_______________________________
Notary Public – State of Florida
________________________________
Print or Type Commissioned Name
Personally Known __________ OR Produced Identification __________
Type of Identification Produced ________________________________
Miami-Dade
Michael D. Kroll, RLA, FASLA
President
29th
June 22 Michael D. Kroll, RLA, FASLA
President
Miller Legg
Marina Hannwacker
X
5. Contract Forms
Page 106Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
E-Verify Affidavit
Florida Statute 448.095 directs all public employers, including municipal governments, to verify the
employment eligibility of all new public employees through the U.S. Department of Homeland Security’s E-
Verify System, and further provides that a public employer may not enter into a contract unless each party
to the contract registers with and uses the E-Verify system.
Florida Statute 448.095 further provides that if a contractor enters into a contract with a subcontractor, the
subcontractor must provide the contractor with an affidavit stating that the subcontractor does not employ,
contract with, or subcontract with an unauthorized alien.
In accordance with Florida Statute 448.095, all contractors doing business with the City of Sunny Isles
Beach are required to verify employee eligibility using the E -Verify system for all existing and new
employees hired by the contractor during the contract term. Further, the contractor must also require and
maintain the statutorily required affidavit of its subcontractors. It is the responsibility of the awarded vendor to
ensure compliance with E-Verify requirements (as applicable). To enroll in E-Verify, employers should visit
the E-Verify website (https://www.e-verify.gov/employers/enrolling-in-e-verify) and follow the
instructions. The contractor must, as usual, retain the I-9 Forms for inspection.
By affixing your signature below you hereby affirm that you will comply with E-Verify requirements.
Company Name
Offeror Signature Date
Print Name Title
Federal Employer Identification Number (FEIN)
Notary Public Information
Sworn to and subscribed before me on this this day of , 2022.
By
Is personally known to me
Has produced identification (type of identification produced: )
Signature of Notary Public
Print or Stamp of Notary Public Expiration Date
8 of 8
Miller Legg
June 29, 2022
Michael D. Kroll, RLA, FASLA President
65-0563467
29 June
Marina Hannwacker
X
03/13/2026
5. Contract Forms
Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
6. Exceptions Page 107
Page 108Request for Qualifications # 22-06-01 Continuing Services for Landscape Architectural Services CCNA
6. Exceptions
Miller Legg takes exception to the following as they are not in compliance with FL Statute 725.08 and is uneforceable.
Indemnity provision section 1.26 on page 5:
HOLD HARMLESS/INDEMNIFICATION:
The Firm shall indemnify, hold harmless, and defend the City of Sunny Isles Beach, it’s officers, agents and employees
from and against any claims, demands or causes of action of whatsoever kind or nature arising out of error, omission,
negligent act, conduct, or misconduct of the Contractor, their agents, servants or employees in the provision of goods
or the performance of services pursuant to this RFQ and / or from any procurement decision of the City including
without limitation, awarding the Contract to the Firm.
Indemnity provision section 1.35 on page 7:
DUTY TO DEFEND, INDEMNIFY AND SAVE HARMLESS:
In consideration of the separate sum of twenty-five dollars ($25.00) and other valuable consideration, the Firm shall
defend, indemnify and hold harmless the City, its officers, agents and employees, from or on account of any injuries or
damages, received or sustained by any person or persons during or on account of any operations connected with the
Work described in the Contract Documents, or by or in consequence of any negligence in connection with the same;
or by use of any improper materials or by or on account of any act or omission of the said Firm, agents, servants or
employees. The Firm will defend, indemnify and hold harmless the City and their agents or employees from and against
all claims, damages, losses and expenses including attorneys’ fees arising out of or resulting from the performance of
the Work, provided that any such claim damage, loss or expense (a) is attributable to bodily injury, sickness, disease
or death, or to injury to or destruction of tangible property (other than Work itself) including the loss of use resulting
wherefrom and (b) is caused in whole or in part by any negligent act or omission of the Firm or anyone directly or
indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not
it is caused by a party indemnified hereunder. In the event that a court of competent jurisdiction determines that Sec.
725.06 (2), F.S. is applicable to this Work, then in lieu of the above provisions of this section the parties agree that Firm
shall indemnify, defend and hold harmless the City, their officers and employees, to the fullest extent authorized by
Sec. 725.06 (2) F.S., which statutory provisions shall be deemed to be incorporated herein by reference as if fully set
forth herein. In the event that any action or proceeding is brought against City by reason of any such claim or demand,
Firm, upon written notice from City shall defend such action or proceeding by counsel satisfactory to City. The
indemnification provided above shall obligate Firm to defend at its own expense or to provide for such defense, at
City’s option, any and all claims of liability and all suits and actions of every name and description that may be brought
against City, excluding only those which allege that the injuries arose out of the sole negligence of City, which may
result from the operations and activities under this Contract whether the Work be performed by Firm or by anyone
directly or indirectly employed by either.
Contact:
Michael Kroll, RLA, FASLA, President
1845 NW 112th Avenue, Suite 211
Miami,FL 33172
mkroll@millerlegg.com