Loading...
HomeMy WebLinkAboutReso 2022-3425RESOLUTION NO. 2022 -� A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, APPROVING CHANGE ORDER NO. 4 TO THE AGREEMENT WITH THE STOUT GROUP, INC. FOR THE CONSTRUCTION OF THE GOLDEN SHORES UTILITY UNDERGROUNDING PROJECT, IN A TOTAL AMOUNT NOT TO EXCEED THREE HUNDRED FOUR THOUSAND EIGHT HUNDRED TWO DOLLARS AND FIFTY-TWO CENTS ($304,802.52), ATTACHED HERETO AS EXHIBIT "A"; AUTHORIZING THE CITY MANAGER TO DO ALL THINGS NECESSARY TO EFFECTUATE THIS RESOLUTION; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the City of Sunny Isles Beach ("City") issued and advertised Invitation to Bid No. 20-08-01 ("Bid") for professional construction services for the Golden Shores Utility Undergrounding Project and received five (5) bids; and WHEREAS, following an evaluation of the bids, it was determined that The Stout Group, Inc. ("Contractor") was the lowest responsible and responsive bidder; and WHEREAS, on October 2111, 2021, via Resolution No. 2021-3257, the City Commission awarded the Bid to, and authorized the City Manager to negotiate and enter into an Agreement with, the Contractor; and WHEREAS, the City Manager negotiated an Agreement with the Contract in an amount not to exceed $5,858,477.87, which includes a contingency in the amount of $375,000.00; and WHEREAS, on May 19th, 2022, via Resolution No. 2022-3345, the City Commission approved Change Order No. 1 to cover the increase in material costs as a result of increases to production and delivery of construction materials, in an amount not to exceed $135,150.30; and WHEREAS, on July 211t, 2022, via Resolution No. 2022-3378, the City Commission approved Change Order No. 2 for the installation of conduits and connections to private meters, in an amount not to exceed $803,000.00; and WHEREAS, via the same Resolution No. 2022-3378, the City Commission also approved Change Order No. 3 for the installation of remaining decorative streetlighting, including poles, luminaries, foundations, and electrical equipment, as well as providing as -built documentation for the final streetlighting and miscellaneous utility conduit installation, in an amount not to exceed $152,735.63; and WHEREAS, it has been determined that the storm drainage within Golden Shores requires improvement along 189th Street, and at the intersection of 185th Street and Atlantic Boulevard, including the addition of new catch basins, manholes and drainage piping; and @BCL@F40B1126.doc Page 1 of 3 WHEREAS, because the Contractor is currently performing the utility undergrounding in the aforementioned area, the Contractor is best suited to perform the additional storm drainage work, as it is fully aware of the complications involved with logistics, traffic control and the unique local conditions, thereby resulting in the minimization of disruptions or inconveniences to the residents of Golden Shores; and WHEREAS, pursuant to Section 62-13(C) of the City's Purchasing Code, purchases made under state general service administration contracts, federal, county or other governmental contracts or competitive bids with other governmental agencies, are exempt from the competitive bidding requirements set forth in Chapter 62; and WHEREAS, the Contractor has submitted Change Order No. 4 for addition of new catch basins, manholes and drainage piping, in an amount not to exceed $304,802.32, utilizing pricing from the FDOT - Miscellaneous Drainage Improvement Contract (E61_97); and WHEREAS, the City Commission wishes to approve Change Order No. 4 to the Agreement with The Stout Group, Inc. for the Construction of the Golden Shores Utility Undergrounding Project, in an amount not to exceed Three Hundred Four Thousand Eight Hundred Two Dollars and Fifty -Two Cents ($304,802.52), bringing the total contract amount not to exceed Seven Million Two Hundred Fifty -Four Thousand One Hundred Sixty -Six Dollars and Thirty -Two Cents ($7,254,166.32), attached hereto as Exhibit "A". NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, AS FOLLOWS: Section 1. Approval of Change Order No. 4. The City Commission hereby approves Change Order No. 4 to the Agreement with The Stout Group, Inc. for the Construction of the Golden Shores Utility Undergrounding Project, in an amount not to exceed Three Hundred Four Thousand Eight Hundred Two Dollars and Fifty -Two Cents ($304,802.52), bringing the total contract amount not to exceed Seven Million Two Hundred Fifty -Four Thousand One Hundred Sixty -Six Dollars and Thirty -Two Cents ($7,254,166.32), attached hereto as Exhibit "A". Section 2. Authorization of City Manager. The City Manager is hereby authorized to do all things necessary to effectuate this Resolution. Section 3. Effective Date. This Resolution shall become effective upon adoption. PASSED AND ADOPTED this 20th day of October 2022. Dana Robin Goldman, Mayor @BCL@F40B1126.doc Page 2 of 3 BERMELLO AJAMIL & PARTNERS, LLC – FIRST AMENDMENT Page 1 of 7 FIRST AMENDMENT TO THE CONTINUING SERVICES AGREEMENT BETWEEN THE CITY OF SUNNY ISLES BEACH AND BERMELLO AJAMIL & PARTNERS, LLC THIS FIRST AMENDMENT TO THE CONTINUING SERVICES AGREEMENT between the CITY OF SUNNY ISLES BEACH (hereinafter “City”) and BERMELLO AJAMIL & PARTNERS, LLC, whose Federal Employer Identification (FEI) No. is 59-1722486 (hereinafter “Consultant”), executed this ____ day of October 2025, is made a part of the original Continuing Services Agreement between the City and Consultant, dated February 16, 2023, (hereinafter “the Agreement”), attached collectively hereto as Exhibit “1.” The City and Consultant hereby agree as follows: 1. OPTION TO RENEW. Effective February 16, 2026, the City hereby elects to exercise its option to renew the Agreement for one (1) year, as set forth in Section 4.1 of the Agreement. There is one remaining one (1) year renewal. 2. AMENDMENT TO EXHIBIT 2 – FEE SCHEDULE. Exhibit “2” attached to the Agreement is hereby substituted with the updated Fee Schedule attached hereto as Exhibit “2.” 3. OTHER PROVISIONS REMAIN IN EFFECT. Except as specifically modified herein, all terms and conditions of the original Agreement between the parties dated February 16, 2023, as amended, shall remain in full force and effect. 4. CONFLICTING PROVISIONS. The terms, statements, requirements, or provisions contained in this First Amendment shall prevail and be given superior effect and priority over any conflicting or inconsistent terms, statements, requirements, or provisions contained in any other document or attachment, including but not limited to Exhibits “1” and “2.” 5. SCRUTINIZED COMPANIES. Pursuant to Florida Statutes Section 287.135, and subject to limited exceptions contained therein, a company is ineligible to, and may not, bid on, submit a proposal for, or enter into or renew a contract with an agency or local governmental entity for goods or services if at the time of bidding, submitting a proposal for, or entering into or renewing a contract, the company is on the Scrutinized Companies that Boycott Israel List or is engaged in the boycott of Israel. Consultants must certify that the company is not participating in a boycott of Israel. Any contract for goods or services of One Million Dollars ($1,000,000) or more shall be terminated at the City’s option if it is discovered that the company submitted a false certification, or at the time of bidding, submitting a proposal for, or entering into or renewing a contract, is listed on the Scrutinized Companies with Activities in Sudan List, the Scrutinized Companies with Activities in the Iran Terrorism Sectors List, created pursuant to Florida Statute Section 215.473, or is or has been engaged in business operations in Cuba or Syria, after July 1, 2018. Any contract entered into or renewed after July 1, 2018 shall be terminated at the City’s option if the company is listed on the Scrutinized Companies that Boycott Israel List or engaged in the boycott of Israel. Consultants must submit the certification that is attached to this agreement as Exhibit “3.” Submitting a false certification shall be deemed a material breach of contract. The City shall provide notice, in writing, to the Consultant of the City’s determination concerning the false certification. The Consultant shall have ninety (90) days following receipt of the notice to respond in writing and demonstrate that the determination was in error. If the Consultant does not demonstrate that the City’s determination of false certification was made in error, then the City City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 (305) 947-0606 phone (305) 949-3113 Fax BERMELLO AJAMIL & PARTNERS, LLC – FIRST AMENDMENT Page 2 of 7 shall have the right to terminate the contract and seek civil remedies pursuant to Florida Statute Section 287.135. 6. HUMAN TRAFFICKING. Pursuant to Section 787.06, Florida Statutes, entitled “Human Trafficking,” a governmental entity cannot execute, renew, or extend a contract with a nongovernmental entity that uses coercion for labor or services, as defined in Section 786.06(2), Florida Statutes. Consultant must submit the affidavit that is attached to this agreement as Exhibit “4,” signed by an officer or an authorized representative of the Consultant, under penalty of perjury, attesting that Consultant does not use coercion for labor or services as defined in Section 786.06(2), Florida Statutes. Submitting a false certification shall be deemed a material breach of contract. IN WITNESS WHEREOF, the parties hereto have executed this First Amendment as of the date mentioned above. BERMELLO AJAMIL & PARTNERS, LLC BY: _______________________________ Luis Ajamil, Manager and Authorized Agent STATE OF FLORIDA: COUNTY OF _______________: The foregoing instrument was acknowledged before me by means of ☐ physical presence or ☐ online notarization, this ____ day of October 2025, by Luis Ajamil, as Manager and Authorized Agent of Bermello Ajamil & Partners, LLC. _____________________________ (SEAL) Notary Public, State of Florida (Signature of Notary Public) _____________________________ (Print, Type, or Stamp Commissioned Name of Notary Public) Personally Known ___ or Produced Identification ___ Type of Identification Produced: _________________ City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 (305) 947-0606 phone (305) 949-3113 Fax BERMELLO AJAMIL & PARTNERS, LLC – FIRST AMENDMENT Page 3 of 7 ATTEST: CITY OF SUNNY ISLES BEACH BY: _____________________________ BY: ________________________________ Mauricio Betancur Larisa Svechin, Mayor CMC City Clerk APPROVED AS TO FORM AND LEGAL SUFFICIENCY BY: ______________________________ Alain E. Boileau, for Nabors, Giblin & Nickerson, P.A., City Attorney City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 (305) 947-0606 phone (305) 949-3113 Fax BERMELLO AJAMIL & PARTNERS, LLC – FIRST AMENDMENT Page 4 of 7 EXHIBIT 1 PREPARED 10-03-2025 2025 - Bermello Ajamil & Partners Inc. Billing Rates CATEGORY BILLING RATE Principal $392.00 Project Manager $275.00 Sr. Landscape Architect $225.00 Sr. Planner $225.00 Landscape Architect $175.00 Senior Planner $250.00 Landscape Designer $150.00 Sr. Cad Technician $150.00 Clerical $120.00 Rates effective to October 1, 2025 Planner $170.00 Senior Project Manager $307.00 ATTEST: Mau Moved by: APPROVED AS TO FORM AND LEGAL SUFF NCY: ncu , CMC, City Clerk Edward A. Dion, City Attorney Seconded by: Vote: s Mayor Goldman al (Yes) (No) Vice Mayor Viscarra(Yes) (No) Commissioner Joseph (Yes) (No) Commissioner Lama (Yes) (No) Commissioner Stuyvesant (Yes) (No) @BCL@F40B1126.doc Page 3 of 3 ?LF, D97 �o' Flo C,Tr OF SUN na0 CITY OF CONTRACT SUNNY ISLES BEACH Change Order Change Order Number: 4 DATE: September 30,2022 PROJECT: ITB NUMBER: 21-08-01 Utility Undergrounding For RESOLUTION NUMBER: 2021-3279 Golden Shores ORIGINAL DOLLAR CONTRACT AMOUNT: $5,858,477.58 NET TOTAL DOLLAR VALUE OF ALL PREVIOUS CHANGE ORDERS: $1,090,885.93 CONTRACT AMOUNT PRIOR TO THIS CHANGE ORDER: $6,949,363.51 DOLLAR AMOUNT OF THIS CHANGE ORDER: $ 304,802.52 NEW DOLLAR CONTRACT AMOUNT: $7,254,166.03 ORIGINAL CONTRACT COMPLETION DATE July 19 2023 TOTAL OF PREVIOUS CHANGE ORDER DAYS: 0 AMOUNT OF DAYS PER THIS CHANGE ORDER: 0 NEW CONTRACT COMPLETION DATE: July 19,2023 DESCRIPTION OF SCOPE OR WORK CHANGES: Golden Shores storm drainage requires improvement along 1891 St. and at the intersection of 1851' St and Atlantic with the addition of new catch basins, manholes and drainage piping. As described on engineered documents provided by Craven Thompson Associates. This work will be accomplished in conjunction with the utility undergrounding conversion in Golden Shores NOTE: Unless specifically stated clearly elsewhere on this page, this contract amendment does NOT include an extension of time or grant any additional general conditions amounts, The City and the Contractor agree that the contract time adjustment and sum agreed to in this document constitute a full and complete settlement of the matters set forth herein, including all direct and indirect costs for equipment, manpower, materials, overhead, profit and delav relating to the Issues set forth In this document. The Stout Group h6wel J CONTRACTOR Edward A. Dion CITY ATTORNEY: `= HPF Associates, Inc PROJECT MANAGER: City of Sunny Isles Beach--] CITY MANAGER: (, 1D p �0 d • C,rr QF SWci h�V City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, Florida 33160 (305) 947-0606 City Hall (305) 949-3113 Fax MEMORANDUM TO: Honorable Mayor and City Commissioners VIA: Stan Morris, City Manager FROM: Susan Simpson, Deputy City Manager DATE: October 20, 2022 RE: Approving Change Order No.4 to the Agreement with The Stout Group fo the Golden Shores Utility Undergrounding Project RECOMMENDATION: Staff recommends approval of this Resolution. REASONS: Change Order No. 4 increases the overall contract amount by $304,802.52 for providing material and labor to enhance the storm drainage system in the Golden Shores neighborhood. Due to the fact that the Stout Group, a multidiscipline utility contractor, is currently performing the utility undergrounding conversion in GS and given the necessary upgrades to the storm system by adding and improving the present system along 189th St and at the intersection of 185th and Atlantic, it is therefore recommended they be awarded this scope of work. Stout is fully aware of the complications involved with logistics, traffic control and all aspects of undergrounding activities to minimize disruptions or inconveniences to the residents of GS. This additional work effort will be in conjunction with the current undergrounding and will not require any additional contract time for execution. FUNDING SOURCE: Funds have been appropriated in account no. ATTACHMENTS: Resolution Change Order No. 4 Item Number: 10.N Item Number: 10.N