Loading...
HomeMy WebLinkAboutReso 2022-3445RESOLUTION NO. 2022 - 5_ A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, APPROVING A PROJECT AGREEMENT WITH KEITH AND ASSOCIATES, INC., d/b/a KEITH, TO PROVIDE PROFESSIONAL CIVIL ENGINEERING AND LANDSCAPE ARCHITECTURAL SERVICES FOR THE INTRACOASTAL COURT SPORTS COMPLEX, IN AN AMOUNT NOT TO EXCEED ONE HUNDRED SIXTY-ONE THOUSAND FOUR HUNDRED DOLLARS ($161,400.00), ATTACHED HERETO AS EXHIBIT "A"; AUTHORIZING THE MAYOR TO EXECUTE SAID AGREEMENT; AUTHORIZING THE CITY MANAGER TO DO ALL THINGS NECESSARY TO EFFECTUATE THIS RESOLUTION; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the City of Sunny Isles Beach ("City") is the owner of the property located at 15800 Collins Avenue; and WHEREAS, on January 21St, 2021, via Resolution No. 2021-3160, the City Commission of short listed six (6) civil engineering firms, in response to Request for Qualifications No. 20-07-01 for Continuing Professional Services ("RFQ"), pursuant to the Consultants' Competitive Negotiation Act; and WHEREAS, the City requested general civil engineering services as one of several disciplines listed in the RFQ; and WHEREAS, Keith and Associates, Inc., d/b/a/ Keith ("Firm") was one of the six (6) firms short listed to provide general civil engineering services ("Services") to the City, and entered into a Continuing Services Agreement to provide said Services on an as needed basis; and WHEREAS, the City is in need of a firm to provide the Services for the design of the Intracoastal Court Sports Complex ("Project"); and WHEREAS, after careful review and consideration, the City Manager has determined that based on relevant experience, qualification, and past performance, the Firm is uniquely positioned to provide the City with the desired Services for the Project; and WHEREAS, the Firm has expressed the ability and desire to provide these Services and has submitted a proposal; and WHEREAS, the City Commission wishes to enter into a Project Agreement with Keith and Associates, Inc., d/b/a/ Keith, to provide the Services for the Intracoastal Court Sports Complex, in an amount not to exceed One Hundred Sixty -One Thousand Four Hundred Dollars ($161,400.00), which includes reimbursables in an amount not to exceed Four Thousand Five Hundred Dollars (4,500.00), attached hereto as Exhibit "A". NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, AS FOLLOWS: @BCL@D40B7869.doc Page 1 of 2 102 Section 1. Approval of Proiect Agreement. The City Commission hereby approves a Project Agreement with Keith and Associates, Inc., d/b/a/ Keith, to provide the Services for the Intracoastal Court Sports Complex, in an amount not to exceed One Hundred Sixty -One Thousand Four Hundred Dollars ($161,400.00), which includes reimbursables in an amount not to exceed Four Thousand Five Hundred Dollars (4,500.00), attached hereto as Exhibit "A". Section 2. Authorization of Mayor. The Mayor is hereby authorized to execute said Agreement. Section 3. Authorization of City Manager. The City Manager is hereby authorized to do all things necessary to effectuate this Resolution. Section 4. Effective Date. This Resolution shall become effective upon adoption. PASSED AND ADOPTED this 15th day of December 2022. ATTEST: MaAcio Beta cur, CMC, City Clerk Dana Robin Goldman, Mayor APPROVED AS TO FORM ANQ,LEGAL SUFFICIENCY: E ward Dion, City Attorney Moved by W Seconded by: Vote: Mayor Goldman (Yes) (No) Vice Mayor Viscarra (Yes) (No) Commissioner Joseph (Yes) (No) Commissioner Lama Yes) (No) Commissioner Stuyvesant ✓ (Yes) (No) @BCL@D40B7869.doc Page 2 of 2 103 PROJECT AGREEMENT Between THE CITY OF SUNNY ISLES BEACH And KEITH AND ASSOCIATES, INC. D/B/A KEITH For INTRACOASTAL SPORTS COURT COMPLEX Pursuant to the provisions contained in the Continuing Services Agreement between the City of Sunny Isles Beach ("City") and Keith and Associates, Inc. d/b/a Keith ("Consultant") for Professional Civil Engineering Services pursuant to Request for Qualifications No. 20-07-01 (hereinafter referred to as "Continuing Services Agreement") dated April 30, 2021, this Project Agreement (hereinafter referred to as "Agreement") authorizes the Consultant to provide the services as set forth below: SECTION 1 INCORPORATION OF CONTINUING SERVICES AGREEMENT 1.1 All terms and conditions of the Continuing Services Agreement between the City and the Consultant dated April 30, 2021, not specifically modified by this Agreement shall remain in full force and effect and are incorporated into and made a part of this Agreement by this reference as though set forth in full. SECTION 2 CONSULTANT'S BASIC DUTIES TO CITY 2.1 By executing this Agreement, the Consultant represents to the City that the Consultant is professionally qualified to act as the Consultant for the Project (hereinafter referred to as "the Project") and is licensed to practice engineering by all public entities having jurisdiction over the Consultant and the Project. The Consultant further represents to the City that the Consultant will maintain all necessary licenses, or other authorizations necessary to act as Consultant for the Project until Consultant's duties hereunder have been completed. The Consultant shall be responsible for providing all necessary subconsultants required for the successful completion of the work as outlined in EXHIBIT "I," Scope of Services. The Consultant assumes full responsibility to the City for the improper acts, negligence, and omissions of its subconsultants and of all others employed or retained by the Consultant in connection with the Project. 2.2 VERIFICATION OF CITY DOCUMENTS AND PROJECT SITE 104 2.2.1 Execution of this Agreement by the Consultant constitutes a representation that the Consultant has become familiar with the Project site and the local conditions under which the Project is to be implemented. 2.2.2 Consultant shall review, examine, and verify the documents and information furnished by the City concerning the Project site with respect to locations, elevations, and all other existing conditions, etc., before preparing design documents. Consultant shall compare any documents furnished by the City to the Project site to verify dimensions, clearances and the like before preparing design documents. The Consultant shall be solely responsible for any inaccuracies or conflicts that might have been detected or avoided by such verification. 2.3 PRELIMINARY ENGINEERING / DESIGN DEVELOPMENT PLANS 2.3.1 The Consultant shall review and examine the information, including any desired schedule and budgetary requirements, furnished by the City to understand the requirements of the Project and shall review its understanding of such requirements with the City. 2.3.2 The Consultant shall furnish to the City a preliminary written evaluation of such information in light of any Project budget requirements. 2.3.3 The Consultant shall review and discuss with the City any alternative approaches to design and construction of the Project. 2.3.4 The Consultant shall prepare and submit to the City for its review of Preliminary Plan documents illustrating the scale and relationship of proposed Project components. The Consultant shall be responsible for furnishing a legal description and any necessary survey(s) of the site, including, as may be reasonably required, grades and lines of streets, alleys, pavements and adjoining structures, rights-of-way, restrictions, easements, encroachments, zoning, deed restrictions, boundaries and contours of the site; locations, dimensions and necessary data pertaining to existing buildings and other improvements; and information concerning available service and utility lines above and below grade, including inverts and depths. 2.3.5 The Consultant shall submit to the City an estimate of probable construction costs for the Project. 2.4 SIXTY PERCENT DESIGN DOCUMENTS 2.4.1 Based on the Preliminary Plan documents and any adjustments to that design, the proposed schedule, or Project budget authorized by the City, the Consultant shall prepare and submit to the City for its review, 60% design documents consisting of drawings and other documents to fix and describe the size and character of the Project as to civil, architectural, structural, mechanical and electrical systems; landscape architectural and irrigation design; materials and such other elements as may be appropriate. 105 2.4.2 The Consultant shall review its estimate of probable construction costs, shall make any appropriate revisions thereto and furnish same to the City. 2.5 ONE HUNDRED PERCENT DOCUMENTS 2.5.1 Upon the City's authorization, the Consultant shall prepare 100% design documents consisting of drawings and specifications setting forth in detail the requirements for construction of the Project. Such Construction Documents shall be project specific and shall be accurate, coordinated and adequate for construction, and shall be in conformity and comply with all applicable law, codes, standards, and regulations. Products specified for use shall be readily available unless specifically authorized by the City. 2.5.2 The Consultant shall review its most recent estimate of probable construction costs, shall make any appropriate revisions thereto and furnish same to the City. 2.5.3 The Consultant shall assist the City in preparing and filing all documents necessary to obtain the approval of all authorities having jurisdiction over the Project. This can begin when the design documents are approximately 90% complete. 2.5.4 The Consultant shall be responsible for the preparation of electronic documents to be included in the City bid packages. Such packages shall include copies of all relevant plans, specifications, and other documents upon which the bidding is to be based. 2.5.5 In the event that there are amendments to the bid packages, amendments to any of the documents contained with the bid packages, or any clarifications issued during the bidding process, the Consultant shall prepare for the City's approval written addenda as appropriate to interpret, clarify or expand the bidding documents. The Consultant shall make such documents available to all prospective bidders in a manner acceptable to the City, and shall be reimbursed for the actual costs of reproduction at the same rate specified in Section 2.5.4. There shall be no additional charges for amendments or clarifications other than as provided in Section 2.5.4. 2.5.6 The Consultant shall coordinate with the City during the bidding process and be available to address bidders' questions and comments at any time during the bidding process. The Consultant shall attend the pre-bid meeting, which will be held at a location as specified by the City. 2.5.7 The Consultant shall be available as necessary to assist the City in the evaluation of all bids received for determination of compliance with the bidding requirements. The Consultant shall not be responsible for performing any investigations or reference checks regarding bidders, nor shall it be responsible for determining whether a bid is responsive or a bidder is responsible; however, the Consultant shall assist the City as necessary in making such determination. 106 2.5.8 The Consultant will investigate, study, and analyze any proposed substitutions of materials or equipment and shall advise the City with respect to same. 2.6 ADDITIONAL SERVICES The following services of the Consultant are not included in Sections 2.3 through 2.5, nor in EXHIBIT "1," Scope of Services. Nevertheless, the Consultant shall provide such services as related to the Project if authorized in writing by the City prior to the performance or furnishing of same, and, unless otherwise specified in this Agreement, said services shall be paid for by the City as provided hereinafter. 2.6.1 Making revisions in drawings, specifications or other documents when such revisions are inconsistent with written direction by the City previously given, are required by the enactment or revision of codes, laws or regulations subsequent to the preparation of such documents and not reasonably anticipated, or are due to other causes not within the control or responsibility of the Consultant, either in whole or in part. 2.6.2 Preparing drawings, specifications and supporting data in connection with Change Orders, provided that such Change Orders are issued by the City due to causes not within the control or responsibility of the Consultant, either in whole or in part. 2.6.3 Providing services concerning repair or replacement of work damaged by fire or other cause during construction provided that such services are required by causes not the responsibility of the Consultant, either in whole or in part. 2.6.4 Providing services made necessary solely by the default of the Contractor or defects or deficiencies in the work of the Contractor. 2.7 SERVICE SCHEDULE 2.7.1 Upon receipt of the Notification of Commencement and the fully executed Purchase Order, the Consultant shall commence services to the City on the Commencement Date, and shall continuously perform services to the City, without interruption, in accordance with the time frames set forth in the "Project Schedule," a copy of which is attached and incorporated into this Agreement as EXHIBIT "1." The number of calendar days from the Commencement Date, through the date set forth in the Project Schedule for completion of the Project or the date of actual completion of the Project, which ever shall last occur, shall constitute the Contract Time. 2.7.2 No Damages for Delay: The Consultant shall not be entitled to any claim for damages including, but not limited to, loss of profits, loss of use, home office overhead expenses, equipment rental and similar costs on account of delays in the progress of the Project from any cause or national disaster or emergency, unusual delay in deliveries, unusual delay in procuring permits, differing site conditions, unavoidable casualties or other cause beyond the Consultant's control, or by delay authorized by the City, or by other causes which the Consultant determines may justify delay. The Consultant's sole recovery and remedy for 107 any such delay shall be a reasonable extension of time and a revision to the Project Schedule as determined by the City. However, additional costs to the Consultant or delays in the Consultant's performance caused by improperly timed activities shall not be the basis for granting a time extension. If the Consultant wishes to make a claim for an increase in time of performance, written notice of such claim shall be made to the City within three (3) working days after the occurrence of the event, or the first appearance of the condition giving rise to such claim. The City's representative shall determine whether the Consultant is entitled to a time extension for the delay. The failure of the Consultant to give such notice shall constitute a waiver of any claim under this section. 2.8 PERSONNEL 2.8.1 The Consultant shall assign only qualified personnel to perform any service concerning the Project. At the time of execution of this Agreement, the parties anticipate that the following named individuals will perform those supervisory or primary functions indicated: NAME FUNCTION Alex Lazowick President So long as the individuals named above remain actively employed or retained by the Consultant, they shall perform the functions indicated next to their names. Furthermore, the City reserves the right to reject any proposed substitution for any of the above named individuals, and the City shall have the further right to require that any individual assigned to the Project by the Consultant be removed from the Project and reassigned for good cause. SECTION 3 CITY'S BASIC DUTIES TO CONSULTANT 3.1 The City shall provide the Consultant with adequate information regarding the City's requirements for the Project including any desired or required design or construction schedule, or both, and any budgetary requirements including fixed limit of construction cost, prior to the start of the Construction Documents Phase of design, upon which the Consultant shall be entitled to rely. 3.2 The City shall review any documents submitted by the Consultant requiring the City's decision, and shall render any required decision pertaining thereto in a timely fashion. 3.3 The City shall furnish structural, mechanical, chemical and other laboratory tests, inspections and reports as required by law or the Construction Contract. 3.4 If the City becomes aware of any fault or defect in the Project, nonconformance with the Construction Contract, or of any errors, omissions or inconsistencies in the drawings or specifications, prompt notice thereof shall be given by the City to the Consultant. 108 3.5 The City shall perform those duties set forth in Sections 3.1 through 3.4 as expeditiously as may reasonably be necessary for the orderly progress of the Consultant's services and of the work. 3.6 The City's review of any documents prepared by the Consultant or its subconsultants shall be solely for the purpose of determining whether such documents are generally consistent with the City's construction program and intent. No review of such documents shall relieve the Consultant of its responsibility for the accuracy, adequacy, fitness, suitability and coordination of its work product. SECTION 4 CONSTRUCTION COSTS 4.1 If the cost of construction exceeds the cost agreed upon by the City by more than 5% of the lowest bona fide bid or negotiated proposal, the City may (1) give written approval of an increase in such fixed limit, (2) authorize rebidding or renegotiating of the Project, (3) terminate the Project and this Agreement in accordance herewith, or (4) cooperate in revising the Project scope or quality, or both, as required to reduce the construction cost. In the case of (4), the Consultant, without additional charge to the City, shall consult with the City and shall revise and modify the drawings and specifications as necessary to achieve compliance with the cost agreed upon by the City. Absent negligence on the part of the Consultant in making its estimates of probable construction cost, providing such modifications and revisions shall be the limit of the Consultant's responsibility arising from the establishment of such construction costs, and having done so, the Consultant shall be entitled to compensation for all other services performed, in accordance with this Agreement. SECTION 5 BASIS OF COMPENSATION 5.1 The City shall compensate the Consultant for an amount not to exceed $156,900.00 based on services rendered pursuant to Sections 2.3 through 2.5 and EXHIBIT "1," Scope of Services. Billings for each phase shall not exceed the amount allocated to each phase. 5.2 Payment to the Consultant of the sum set forth in Section 5.1 shall be allocated for work completed for each of the following tasks: Task 101 - Boundary and Topographic Survey .....................................................$9,600.00 Task 102 - Existing Easement Research (By Subconsultant - Paramount Title Services) — Optional Services ....................$1,350.00 Task 103- Additional Boundary and Topographic Survey...........................$7,500.00 Task 104 —Additional Existing Easement Research (By Subconsultant-Paramount Title Services)- Optional Services ...................$1,350.00 Task 201 - Geotechnical Testing and Reporting (By Geotechnical Sub. - NV5)...........................................................$2,400.00 109 Task 202 — Additional Geotechnical Testing and Reporting (Geotech. Sub.-NV5)..................................................................... $2,400.00 Task 301 - Site Plan Preparation and Processing ...................................................$8,500.00 Task 302 — Conceptual Site Plan.........................................................$8,500.00 Task 303 — Additional Site Plan Preparation and Processing.........................$5,500.00 Task 401 - Preliminary Engineering/Design Development Plans ...................$7,000.00 Task 402 - Engineering Construction Documents (CD).............................$10,500.00 Task 403 - Engineering Permitting......................................................$7,500.00 Task 404 — Additional Preliminary Engineering/Design Development Plans...... $3,500.00 Task 405 — Additional Engineering Construction Documents ......................$4,200.00 Task 406 - Additional Engineering Permitting.........................................$3,500.00 Task 501 - Electrical Construction Documents (CD) (By Electrical Sub. — SGM) .... ....................... $4,100.00 Task 502 — Additional Electrical Construction Documents (CD) (By Electrical Sub.-SGM)................................................................$2,500.00 Task 601 — Environmental Consulting & Permitting Services (By Environmental Subcontractor).....................................................$30,000.00 Task 701 - Landscape Design Development Plans................................................$7,500.00 Task 702 - Tree Inventory and Appraisal by Certified Arborist .....................$3,000.00 Task 703 - Landscape Construction Documents (CD)........................................$13,500.00 Task 704 — Additional Landscape Design Development Plans ......................$3,800.00 Task 705 — Additional Tree Inventory and Appraisal by Certified Arborist ....... $2,200.00 Task 706 - Additional Landscape Construction Documents..........................$7,000.00 5.3 Additional services of the Consultant as described in Section 2.6, if any, shall be compensated as follows: See EXHIBIT "1" of this Agreement "Fee Schedule" — 5.4 Reimbursable Expenses as defined in Section 6 shall be reimbursed to the Consultant by the City as provided in Section 6. 5.5 If the scope of the Consultant's services are changed materially through no fault of the Consultant, compensation due to the Consultant shall be equitably adjusted, either upward or downward. 110 SECTION 6 BILLING AND PAYMENTS TO CONSULTANT 6.1 Billing by the Consultant shall be in accordance with EXHIBIT "1" of this Agreement. Payments to the Consultant shall also be in accordance with EXHIBIT "F" of the Continuing Services Agreement and EXHIBIT "1" of this Agreement. 6.2 REIMBURSABLE EXPENSES 6.2.1 Reimbursable Expenses shall mean expenses incurred by the Consultant and Consultant's subconsultants in the interest of the Project, as follows: Not to exceed $4,500.00 without prior written authorization by the City. 6.2.1.1 Reasonable expenses of. mileage reimbursement in accordance with Chapter 112, Florida Statutes; fees paid for securing approval of authorities having jurisdiction over the Project; actual cost of reproduction, postage and handling of drawings, specifications and other documents; renderings, models and mock-ups requested by the City; additional insurance coverage or limits, including professional liability insurance, requested by the City in excess of that required in the Request For Qualifications. The Consultant shall only be reimbursed for the direct cost of the item without additional mark-up. Costs for meals, snacks, and beverages are not considered a reimbursable expense. 111 SECTION 7 TERM 7.1 This Agreement shall commence on the date this instrument is fully executed by all parties and shall continue in full force and effect for a term of two (2) years unless otherwise terminated pursuant to Section 8.1 or 8.2, or other applicable sections of this Agreement. SECTION 8 TERMINATION 8.1 TERMINATION FOR CAUSE 8.1.1 This Agreement may be terminated by either party upon seven (7) days' written notice to the other should such other party fail substantially to perform in accordance with its material terms through no fault of the party initiating the termination. In the event of a termination for cause, the Consultant shall be entitled to receive compensation for any work completed pursuant to the Agreement to the satisfaction of the City through the date of termination, less any amounts which the City reasonably deems necessary to withhold in order to correct any defects or deficiencies in the work performed by the Consultant. In no event shall the City pay for profit or overhead on work not performed. 8.2 TERMINATION FOR CONVENIENCE 8.2.1 This Agreement may be terminated by the City without cause upon ten (10) days' written notice to the Consultant. In the event of such a termination without cause, the Consultant shall be compensated for all services completed pursuant to this Agreement to the satisfaction of the City up to and through the date of termination, together with Reimbursable Expenses incurred. In such event, the Consultant shall promptly submit to the City its invoice for final payment and reimbursement which invoice shall comply with the provisions of Section 2.5 of EXHIBIT "F" of the Continuing Services Agreement. 8.2.2 Under no circumstances shall the City make payment of profit or overhead for work that has not been performed. Additionally, the City shall not make payment for the following items: 8.2.2.1 Anticipated profits or fees to be earned on completed portions of the work; 8.2.2.2 Consequential damages; 8.2.2.3 Costs incurred in respect to materials, equipment or services purchased or work done in excess of reasonable quantitative requirements of this Agreement; 8.2.2.4 Expenses of Consultant due to the failure of Consultant or its subconsultants to discontinue the work with reasonable promptness after notice of termination has been given to the Consultant; and 8.2.2.5 Losses upon other contracts or from sales or exchanges of capital assets or Internal Revenue Code Section 1231 assets. 112 8.2.2.6 Damage or loss caused by delay. 8.3 Assignment Upon Termination. Upon termination of this Agreement, the work product of the Consultant shall become the property of the City and the Consultant shall within ten (10) working days of receipt of written direction from the City, transfer to either the City or its authorized designee, all work product in its possession, including but not limited to, designs, specifications, drawings, studies, reports and all other documents and data in the possession of the Consultant pertaining to this Agreement. Upon the City's request, the Consultant shall additionally assign its rights, title and interest under any subcontractor's agreements to the City. All work product provided under this Section shall be used solely for its intended purpose. SECTION 9 SEVERABILITY 9.1 If any term or provision of this Agreement or its application thereof to any person or circumstance shall, to any extent, be held invalid or unenforceable, the remainder of this Agreement or the application of such terms or provisions to persons or circumstances other than those to which it is held invalid or unenforceable, shall not be affected, and every other term and provision of this Agreement shall be deemed valid and enforceable to the extent permitted by law. [SIGNATURE PAGE TO FOLLOW] 113 IN WITNESS WHEREOF, the parties hereto have made and executed this Agreement on the respective dates under each signature: the City, signing by and through its Mayor, attested to by its City Clerk, duly authorized to execute same and by Keith and Associates, Inc. d/b/a Keith, signing by Alex Lazowick and through its President duly authorized to execute same. Mauricio Betancur (SEAL) CITY CITY OF SUNNY ISLES BEACH, FLORIDA By: Dana Robin Goldman, Mayor day of , 2021 Approved as to form for the City: Edward A. Dion, City Attorney By: k—Ewar . Dion City Attorney 114 AUTHENTICATE: Secretary Elizabeth Underwood Please type name of Secretary WITNESSES: l Kristen Lawlor, Sr Director CONSULTANT KEITH and Associates, Inc. 1 By: Lazowick, President 19 day of December , 2022. P,.• µPOIQq • �� ate. CO ��' . tP SEAL. O �' 998 (CORPORATE SEAL) 115 EXHIBIT "1" SCOPE OF SERVICES & PROJECT SCHEDULE Proposal dated April 6, 2022 and Proposal CA O1 dated October 6, 2022 116 0 5 KEITH Engineering Inspired Design. WORK AUTHORIZATION PURSUANT TO THE CONTINUING PROFESSIONAL ENGINEERING SERVICES AGREEMENT BETWEEN THE CITY OF OF SUNNY ISLES BEACH AND KEITH AND ASSOCIATES, INC. (KEITH) M aFGh 31 2022 April 6, 2022 WORK AUTHORIZATION NO. # 02 TASK ORDER NO. (CITY No. TBD) PROJECT NO. 11723.02 (KEITH) PROJECT NAME: New Park at Ritz Carlton Sales Center Site Project Location: 15800 Collins Ave., Sunny Isles Beach, FL 33160 PROJECT The City of Sunny Isles Beach (CITY/OWNER/CLIENT) has requested that KEITH (CONSULTANT) provide Civil Engineering and Landscape Architecture professional services for the development of a new park at the location of the former Ritz Carlton Sales Center site. The property is identified within Folios #31-2214-008-0071 and #31-2214-004-0180, owned by the City of Sunny Isles and is approximately 0.7 acres. The existing park property is located on the northwest corner of 158th Street and Collins Avenue (S.R. A1A). The Construction Documents and shall consist of: 1. Removal of existing trailers. 2. Install at least one (1) multiuse court that allow tennis / basketball / volleyball. 3. Install as many pickle ball courts as possible. 4. All courts should be lighted. 5. Construct a small building consisting of: a. An open concept welcome kiosk station / office consisting of two workstations to assist visitors. Approx. 1,000 SF. b. Storage / Closet space to store court equipment. c. Restrooms with exterior access for use by staff and visitors to the park. The CITY indicated that they would prefer it be located towards the north end of the facility (if possible) to allow visitors to the Intracoastal Waterway Park to the north to use it. The City advised that the building will be designed by City selected Architect (Rodriguez Architects, Inc.) under separate contract but will require KEITH to closely coordinate with them. 6. Landscape and Hardscape Improvements consistent with other existing parks throughout the City. Shading of the courts from Collins Avenue (S.R. A1A) and saving existing trees (seagrapes) to the south is important. The City indicated that they will allow variations in hardscape elements from other parks but in addition to aesthetics, durability and low maintenance is key. www.KEITHteam.corn pompano beach (HQ) 9 fort Lauderdale 9 ,miami • west palm beach • orlando s tallahassee 117 April 6, 2022 / Page 2 of 12 11723.02 — New Park at Ritz Carlton Sales Center Site City of Sunny Isles Beach Per the CLIENT, the following professional services are to be included in the proposal: 1. Surveying by KEITH 2. Civil Engineering by KEITH 3. Landscape Architecture by KEITH 4. Geotechnical Testing by subconsultant (NV -5) 5. Site Lighting by subconsultant (SGM) Per the CLIENT, the following deliverable/phases are to be included in the proposal: • Phase 1 - Design Development Plans (including Civil and Landscape). • Phase 1 - Initial Construction Documents (60% CDs) for Outside Agency Permitting • Phase 1 - Final Construction Documents (100% CDs) Project Areas — Site Map SCOPE OF SERVICES Engineering Inspired Design. 118 April 6, 2022 / Page 3 of 12 11723.02 — New Park at Ritz Carlton Sales Center Site City of Sunny Isles Beach SURVEY SERVICES Task 101 Boundary and Topographic Survey KEITH shall prepare a Boundary and Topographic Survey of the site. The Survey shall show the boundary lines of the City property (Folios #31-2214-008-0071 and #31-2214-004-0180) depicted in red. The Topographic Survey shall include the surface improvements such as buildings, roadways, pavement, sidewalks, traffic striping, walls, fences, surface utilities, etc. Trees shall be noted by common name and trunk diameter. Storm and Sanitary structures shall be noted with the pipe invert elevation, diameter, material, and direction. The topography shall include the area depicted in red and S.R. A1A to the western edge of pavement and NW 158th St to the north edge of pavement. Elevations shall be shown at an interval of approximately 50 feet, including intermediate changes in grade. Note: Vertical Datum for this survey shall be NGVD 1929 unless otherwise directed by Client and the Horizontal Datum shall be NAD 83/2011. Task 102 Existing Easement Research (By Subconsultant - Paramount Title Services) — Optional Services The Subconsultant (Paramount Title Services) will prepare an on-site easement and adjoining right- of-way search. This is not a title commitment. Results of such search will be provided to KEITH to include as part of the Boundary and Topographic Survey. This task is offered as Optional Services in lieu of the City/Client supplying KEITH with all documents covering easements, encumbrances, Title Commitment and exception documents referenced therein. Survey will include review, depiction and/or notation of applicable documents. SUBSURFACE UTILITY ENGINEERING (SUE) SERVICES Subsurface Utility Engineering (SUE) Services including horizontal designation, utility location, utility mapping and franchise utility coordination are not included in this scope of work. If required, the CONSULTANT will be pleased to provide additional services under a separate agreement. GEOTECHNICAL ENGINEERING SERVICES (By Geotechnical Sub. — NV5) Refer to Exhibit `A' — NV5 (Sub -Consultant) Geotechnical Engineering Services Scope and Fees. Task 201 Geotechnical Testing and Reporting (By Geotechnical Sub. - NV5) The geotechnical subconsultant (NV5) will provide geotechnical engineering testing and reporting services for the new Park located in the City of Sunny Isles Beach in Florida consisting of: NV5 proposes to drill two (2) borings to around 15 to 20 feet below grade at the site. Proposed boring locations are shown with red circles in the image below. Boring locations could shift due to actual site conditions. Engineering Inspired Design. 119 5,E] April 6, 2022 / Page 4 of 12 11723.02 — New Park at Ritz Carlton Sales Center Site City of Sunny Isles Beach The borings will be drilled utilizing the rotary wash method with a truck -mounted drill rig. Samples of the subsurface materials encountered will be collected continuously down to 10 feet below ground surface. Below that depth the sampling will be performed at roughly 5 -foot intervals. Sampling will be performed using a Standard Penetration Test (SPT) sampler per ASTM D-1586. Upon completion of the borings, the boreholes will be grouted to the ground surface. 2. In addition to the borings, we propose performing two (2) field permeability tests to provide information for drainage design at the site. The tests will be performed to 15 feet below the existing grade in general accordance with the South Florida Water Management District's Usual Open Hole Procedure. Upon completion of the tests, the boreholes will be abandoned with grout to the ground surface. Test locations can be coordinated with the project civil engineer as appropriate. 3. For performing the fieldwork, NV5 will contact Sunshine One Call for advice about the location of underground utilities. Additionally, we require that any other available information regarding the location of underground utilities be provided to us. NV5 cannot be held responsible for damage to below ground structures or utilities that are not identified to us. We specifically request any available information about the location of underground utilities for this project. 4. An NV5 representative will layout test locations based on the furnished drawings. NV5 will perform borings in areas that are indicated to be free from underground utilities. 5. We note that the site is an active facility. We will rely on the client to provide all necessary site contact information for NV5 to efficiently execute the field work. Site contact name and contact information will be required prior to starting our field work. While NV5 will make reasonable efforts to minimize disruption to any site daily activities, it should be understood that NV5 could need to occupy parking and drive areas for execution of the work. Additionally, drilling is an inherently noisy and messy operation. While NV5 will make reasonable efforts to clean the drill locations upon completion of the work, some soil residue could remain at the ground surface. It is our experience that such soiling is typically washed away by rain showers over time. 6. Based on our field data we will perform engineering analyses and prepare an engineering report with evaluations and discussions of the geotechnical aspects of the proposed development, and provide geotechnical recommendations for design and construction. Specifically, the report will provide: • Drawings showing test locations, a graphic summary of the generalized subsurface conditions, and boring logs with detailed descriptions of the materials encountered. • Discussion of generalized subsurface conditions at the site including groundwater including hydraulic conductivity. • Discussion of feasible foundation type(s) for the proposed construction. • Design parameters for the recommended foundation type, including vertical and lateral load resistance. • Estimates of foundation settlements. • Modulus of subgrade reaction for any slabs on grade. • Recommendations for pavement thickness design • Recommendations for site preparation and grading, including the re -use of site -excavated materials for fill, fill placement and compaction, and slab and pavement subgrade preparation. Engineering Inspired Design. 120 0 April 6, 2022 / Page 5 of 12 11723.02 — New Park at Ritz Carlton Sales Center Site City of Sunny Isles Beach • Construction considerations including excavation support and dewatering, impacts of existing foundations, and impacts for adjacent structures. The report will be signed electronically and sealed by a professional engineer licensed in the State of Florida. PLANNING SERVICES Task 301 Site Plan Preparation and Processing KEITH will develop up to three (3) Conceptual Design options for City's review. Based on client feedback, up to two (2) revisions will be developed to define the preferred design direction to be moved forward into the Design Development phase. Concept package shall include: a. Illustrative Site Plan(s) b. Supporting Diagrams c. Character Imagery Once the City has selected the preferred concept, KEITH will prepare one (1) dimensioned / detailed Site Plan in accordance with the requirements of the City Land Development Code which will include proposed building locations, vehicular circulation, required landscape areas/buffers, parking requirements, setbacks, dumpster location, fire access and other issues required by City Land Development Code. KEITH shall process one (1) Site Plan application which encompasses the project through the City, including the Development Review Committee (DRC), Planning and Zoning Board (PZB) and City Commission, if applicable. Services include assisting with the preparation of the application and submittal requirements. Additional tasks associated with the conditions of the development order, additional tasks related to the DRC approval and/or CLIENT comments, may be required. If required, KEITH will provide these additional services under a separate agreement. CIVIL ENGINEERING SERVICES Task 401 Preliminary Engineering / Design Development Plans The Preliminary Plans are for CITY and/or City's Planning and Development Services Department to review and approve the preliminary design. KEITH will utilize a topographic survey prepared by KEITH, and the Phase 1 - Site Plan prepared by KEITH and approved by the CITY to prepare the preliminary / design development civil engineering plans. The preliminary engineering plan shall include available existing utility information collected from various sources (City, utility providers etc.). This preliminary utility information will be relied upon by KEITH in the preliminary design phase. Final design may require additional survey and/or Subsurface Utility investigation to verify the preliminary information supplied. Preliminary water, sanitary sewer and drainage calculations shall be performed to address the impacts of the proposed development relating to the requirements of the site plan submission. One preliminary engineering plan will be prepared based on the supplied conceptual site plan provided by the CITY. The preliminary plans will contain the location of the proposed site lighting as designed by the Site Lighting Electrical subconsultant (SGM). Engineering Inspired Design. 121 1 April 6, 2022 / Page 6 of 12 11723.02 — New Park at Ritz Carlton Sales Center Site City of Sunny Isles Beach KEITH shall attend one (1) coordination meeting with the CITY and City's Planning and Development Services Department to review the preliminary design, code and integration of the design with existing conditions (including utilities/trees/etc.) and environmental impacts of the project. KEITH will coordinate with the CITY and other team members in the preparation of plans to avoid conflicts between disciplines. KEITH shall coordinate, prepare for and attend meetings with Government Agencies, including project orientation meetings for base -line design agreements, review with City Planning, Zoning, Fire Marshall, Engineering, and Utility representatives, and coordinate with applicable State, and County Agencies required for final permit submittals. Deliverables 1. Preliminary Engineering / Design Development Plans. 2. Preliminary Water, Sanitary Sewer and Drainage Calculations as required. 3. Meetings and Team Coordination — During the specified duration in the project schedule, the KEITH team will attend up to three (3) required meetings and coordination. It is assumed all meetings will be in South Florida. Task 402 Engineering Construction Documents (CD) On-site Paving, Grading, and Drainage Plans KEITH shall prepare on-site paving, grading, and drainage construction plans, to support the proposed development, that meet the requirements of the jurisdictional regulatory agencies. Calculations shall be performed to address the impacts of the proposed development relating to the requirements for permit agency submittal. The stormwater management system will address water quality treatment and water quantity storage to meet the requirements of the jurisdictional agencies. It is anticipated that the proposed drainage system will consist of a series of catch basins, pipes, swales and perhaps exfiltration trenches. Typical sections and standard paving and drainage details and notes for the construction of the paving, grading, and drainage system are included. Soils percolation tests to satisfy regulatory agency requirements will be performed by the geotechnical subconsultant (NV5). Off-site roadway improvements, other than direct driveway connections, are not included in this scope of work. On-site Pavement Marking & Signing Plans The CONSULTANT shall prepare a signing and pavement marking plan for the project that meets the requirements of the regulatory agencies. This plan shall include standard details and notes. On-site Water Distribution and Sanitary Sewer Plans KEITH shall prepare combined water distribution and sanitary sewer system plans to service the proposed improvements. It is assumed that the existing domestic/irrigation/fire services and sanitary sewer services are adequate and have sufficient capacity to provide service to the new park site. Off- site water and/or sanitary sewer improvements (including new water meters) are not included in the scope of work. North Miami Beach (NMB) Utilities is the water service provider and Miami -Dade Water and Sewer Department (MDWASD) is the sanitary sewer service provider. Erosion Control Plan KEITH shall prepare an Erosion Control Plan for the project that meets the requirements of the regulatory agencies and for the Contractor's use in preparing and processing the required Stormwater Pollution Prevention Plan (SWPPP), in compliance with the "Generic Permit for Stormwater Discharge from Large and Small Construction Activities (CGP)" through FDEP. The Erosion Control Plan(s) shall include standard details and notes to meet the requirements of the regulatory agencies. Engineering Inspired Design, 122 1 April 6, 2022 / Page 7 of 12 11723.02 — New Park at Ritz Carlton Sales Center Site City of Sunny Isles Beach On-site Demolition Plan KEITH shall prepare a Demolition Plans incorporating removal of the existing improvements in conflict with the proposed improvements. This plan shall include standard details and notes. Should permitting be required for this work, it will need to be provided by a licensed demolition contractor. Note: The use of explosive demolition materials and the assessment for or removal of hazardous materials or toxic waste are not included in these services and will not be incorporated in the Demolition Plan. Deliverables 1. Construction Documents (60% and Final Construction Documents) for above referenced Plans. 2. Specifications — For above referenced Design Elements (specifications may be included in the plan sheets or a separate document for inclusion in the Contract Document Specification book.) 3. Water Sewer and Drainage Calculations as required. 4. Meetings and Team Coordination — During the specified duration in the project schedule, the KEITH team will attend up to three (3) required meetings and coordination. It is assumed all meetings will be in South Florida. Task 403 Engineering Permitting KEITH shall attend required pre -application meetings with agencies having jurisdiction over the facilities designed by KEITH, and prepare and submit the permit applications for the construction of the following improvements and process them through the following regulatory agencies: Development Review Site Plan/Design Review through the City of Sunny Isles Beach. Floodplain Management. Florida Department of Transportation — Landscape Permit and Maintenance Agreement. Not included. Water and Sewer System It is assumed that the existing domestic/irrigation/fire services and sanitary sewer services are adequate and have sufficient capacity to provide service to the new park site. Off-site water and/or sanitary sewer improvements (including new water meters) are not included in the scope of work. North Miami Beach (NMB) Utilities is the water service provider and Miami -Dade Water and Sewer Department (MDWASD) is the sanitary sewer service provider. Paving, Grading, and Drainage System • Miami -Dade County DERM — Water Control Section (WCS). • City of Sunny Isles Beach Engineering Department. • Florida Department of Transportation (FDOT) — Drainage Connection Permit. Not included. Pavement Markings and Signage • Florida Department of Transportation (FDOT) — Driveway Connection Permit. Not included. • City of Sunny Isles Beach Engineering Department. If additional permits are required, KEITH shall process them and the fees for these additional services will be submitted to CLIENT as additional services under a contract addendum if required. Deliverables 1. Permit applications and submittal documents required for above listed regulatory agencies for the listed project improvements. Engineering Inspired Design. 123 1 April 6, 2022 / Page 8 of 12 11723.02 — New Park at Ritz Carlton Sales Center Site City of Sunny Isles Beach ELECTRICAL ENGINEERING DESIGN SERVICES (By Electrical Sub. - SGM Engineering) Refer to Exhibit 'B' — SGM Engineering (Sub -Consultant) Electrical Engineering Services Scope and Fees. Task 501 Electrical Construction Documents (CD) (By Electrical Sub. - SGM Engineering) The electrical subconsultant (SGM) will provide electrical engineering services for the design documents of the new lighting system to illuminate the new pickle ball and multi -sports courts for the Ritz Carlton Sales Center Park located in the City of Sunny Isles Beach in Florida. The following elements will be addressed in the design phase: 1. Visit the site where the new courts are going to be installed to investigate and survey the following conditions of the area: a. Record all existing electrical utilities in the area that are required to be removed or relocated to make space for the new courts. 2. Provide design for new electrical underground branch circuits (conduit and wire) for the sports court lighting poles added to the pickle ball and multi -sports courts. 3. Provide lighting fixture schedules for all sports lighting. 4. Provide selection of code complaint (wind load) parking lot poles with associated bases and underground boxes. 5. Provide new panelboards and circuit breakers at existing buildings for source of power for all lighting fixtures and irrigation equipment. 6. Design documents will include electrical book of construction specifications. LEED administration or design services are not included in this proposal. These services can be provided by SGM at additional cost. LANDSCAPE ARCHITECTURE SERVICES Task 701 Preliminary Landscape / Design Development Plans KEITH will prepare for the approval of the Client the Preliminary Landscape Plans. The purpose of this task is to work collaboratively with the design team to finalize the optimum arrangement of all program and site design elements. These drawings will be in sufficient detail for submittal to the City's Planning and Development Services Department for review and approval of the preliminary design. The following elements will be addressed in the Preliminary / Design Development phase: 1. Site program a. Landscape treatment and design approach for each development zone, including refinement of design concepts for all outdoor spaces. b. Hardscape and vehicular treatments. c. Pedestrian circulation and access issues identified in conceptual programming. Deliverables 1. KEITH will develop drawings, plans, sections and other information to describe the nature, quality, and scope of site elements of the project. 2. KEITH will furnish the design development submittal, which will be sufficient detail for Site Plan Submittal for Landscape. This submittal also includes a revision for response to City Comments. Changes to the plan due to other disciplines are not included. a) Landscape Plan — Specification, quantity, layout, notes and details. Engineering Inspired Design. 124 ,IV April 6, 2022 / Page 9 of 12 11723.02 — New Park at Ritz Carlton Sales Center Site City of Sunny Isles Beach b) Irrigation Statement —Indicate water source and general requirements. 3. Meetings and Team Coordination — During the specified duration in the project schedule, KEITH will attend all required meetings and coordination. It is assumed all meetings will be in South Florida. NOTE: This task includes one (1) drawing revision with corresponding comment response letters with the intent of obtaining city approval. If additional revisions are required as a result of city, CLIENT and/or Design Team changes, a contract addendum will be submitted to the CLIENT. Task 702 Tree Inventory and Appraisal by Certified Arborist KEITH will visit the project to confirm and evaluate the location, size and quality of existing trees on the project site and identify which trees shall be removed or relocated, as well as any remaining trees that will require protection. Deliverables 1. KEITH will develop a Tree Disposition Plan depicting all existing trees on the project site. This plan will indicate species (scientific and common name), size (DBH, height and canopy spread) and condition according to ISA regional information. Plan will also note which trees are to be removed, which are to be relocated, and which are to remain and be protected throughout construction. 2. KEITH will develop a table including basic tabulations and calculations for tree removal and mitigation as required by local jurisdiction. NOTE: It is assumed that no arborist reports will be required for this project. If requested, a contract addendum will be submitted to the CLIENT. * Task 703 Landscape Construction Documents (CD) Based on the approved Design Development phase, KEITH will develop the construction documents in coordination with the overall design team and CLIENT. The drawings will be developed in a 60% or preliminary documentation for review and coordination, as well as a final for Permit or 100% Construction Documentation. Deliverables 1. Construction Documents (60% and Final Construction Documents) a. Hardscape & Layout Plan — Material type and layout. b. Sitework Details — General details and section/elevations for character and project understanding - All structural engineering by others and not included in this proposal. c. Landscape Plan and Details — Specific elements, specification, quantity, layout, notes and details. d. Irrigation Plans and Details — Point of connection, head layout, piping, equipment schedule and details. e. Site Furniture — Furniture layouts and specific catalog cuts and material selections. 2. Specifications — For above referenced Design Elements (specifications will be included in the plan sheets). 3. Meetings and Team Coordination — During the specified duration in the project schedule, KEITH will attend all required meetings and coordination. It is assumed all meetings will be in South Florida NOTE: This task includes one (1) drawing revision (after the release of 100% Construction Drawings) in response to City comments. If additional revisions are required as a result of CLIENT and/or Design Team changes, a contract addendum will be submitted to the CLIENT. * Engineering Inspired Design. 125 RD April 6, 2022 / Page 10 of 12 11723.02 — New Park at Ritz Carlton Sales Center Site City of Sunny Isles Beach CONSTRUCTION / PROJECT MANAGEMENT SERVICES Construction / Project Management Services are not included in this scope of work. If required, the CONSULTANT will be pleased to provide additional services under a separate agreement. PROJECT SCHEDULE Subsequent to the issuance of a Purchase Order from the CITY, CONSULTANT shall commence work on the project. We anticipate commencing work within 5 business days from notice to proceed, completing the prescribed work within six (6) months. Table 1 Schedule Estimate of Services TASK DURATION 6 weeks Task 101 - Boundary and Topographic Survey Task 102 Existing Easement Research (By Subconsultant - Paramount Title Services) — Optional Services 4 weeks Task 201 - Geotechnical Testing and Reporting (By Geotechnical Sub. — NV5) Concurrent with Task 101 Task 301 - Site Plan Preparation and Processing 2 months Task 401 - Preliminary Engineering / Design Development Plans 1 month Task 402 - Engineering Construction Documents (CD) 3 months Task 403 - Engineering Permitting 2 to 3 months Task 501 — Electrical Construction Documents (CD) (By Electrical Sub. - SGM Engineering) Concurrent with Task 402 Task 701 - Preliminary Landscape / Design Development Plans Concurrent with Task 401 Task 702 - Tree Inventory and Appraisal by Certified Arborist Concurrent with Task 401 Task 703 - Landscape Construction Documents (CD) Concurrent with Task 402 Schedule Disclaimer: Considering the ongoing outbreak of the Coronavirus 2019 (COVID-19), KEITH remains fully committed to pursuing the completion of our work in a safe, diligent, and reasonable manner under the current circumstances based on the schedule provided. It is possible that we will encounter certain delays because of this pandemic. Potential impacts may include, but are not limited to, labor shortages due to mandated quarantine regulations, material shortages and significant delays in lead times because of factory closings across the globe. We will continue to monitor the situation and advise of any delays resulting from the impacts of the current worldwide health scenario. Engineering Inspired Design. 126 1 April 6, 2022 / Page 11 of 12 11723.02 — New Park at Ritz Carlton Sales Center Site City of Sunny Isles Beach CITY'S RESPONSIBILITY The CITY shall assist CONSULTANT with the following items to expedite the completion of the project in an effective manner. A. Designate a representative(s) who shall have the authority to transmit instruction, receive information and enunciate policies and decisions. B. Provide access to and obtain permission for CONSULTANT to enter upon public lands as required at no additional cost to perform observations or other necessary services under this Agreement. C. Make available to CONSULTANT all existing information which may in any way be pertinent to the project. D. Assist in contacting all permitting agencies to facilitate expediting reviews and/or approvals. ADDITIONAL SERVICES Consultant shall not perform any additional services without the written consent of the CITY. Services performed beyond the Scope of Services described above shall be considered additional services and will be presented to the CITY as an Addendum to this Agreement prior to initiating the work. Additional services shall be invoiced on a time and material basis in accordance with our current Professional Service Fee Schedule or on a lump sum basis if a scope of service can be defined. Engineering Inspired Design. 127 1 April 6, 2022 / Page 12 of 12 11723.02 — New Park at Ritz Carlton Sales Center Site City of Sunny Isles Beach COMPENSATION Consultant shall invoice the City for services rendered under this Agreement on a lump sum basis, unless otherwise stated, and in accordance with the terms and conditions of the Continuing Services Agreement for Professional Engineering Services between the City of Sunny Isles Beach and KEITH. Table 2 Budget Estimate of Engineering Services TASK FEE Task 101 - Boundary and Topographic Survey $9,600(Lump Sum Task 102 - Existing Easement Research (By Subconsultant - Paramount Title Services) — Optional Services $1,350 (Lump Sum) Task 201 - Geotechnical Testing and Reporting (By Geotechnical Sub. - NV5) $2,400 (Lump Sum) Task 301 - Site Plan Preparation and Processing $8,500(Lump Sum Task 401 - Preliminary Engineering / Design Development Plans $7,000(Lump Sum Task 402 - Engineering Construction Documents (CD) $10,500(Lump Sum Task 403 - Engineering Permitting $7,500 ump Sum Task 501 - Electrical Construction Documents (CD) (By Electrical Sub. - SGM) $4,100 (Lump Sum) Task 701 - Landscape Design Development Plans $ 7,500(Lump Sum Task 702 - Tree Inventory and Appraisal by Certified Arborist $ 3,000 (Lump Sum) Task 703 - Landscape Construction Documents (CD) $13,500(Lump Sum CONSULTANT'S TOTAL COMPENSATION $74,950 (Lump Sum) DIRECT EXPENSES / REIMBURSABLES $3,500 (Time and Materials) TOTAL FEE $78,450 "CITY": CONSULTANT: CITY OF SUNNY ISLES BEACH KEITH By: 0 By: ALEX LAZOWICK President Engineering Inspired Design. 128 Exhibit 'A' April 6, 2022 Mr. Mark Castano, P.E. Keith mcastano@keithteam.com Reference: Proposal for Subsurface Exploration & Geotechnical Engineering Study Proposed Park NW Corner Intersection Collins Avenue and 158th Street Sunny Isles, Florida NV5 Proposal No. 22-0299REV1 Dear Mr. Castano: We are pleased to submit this proposal in response to your request. This proposal describes our understanding of the project, lists a purpose for our work, suggests a specific scope of work, and presents our compensation. CAPABILITIES AND EXPERIENCE NV5, Inc. is a consulting firm providing geotechnical and construction materials engineering. We also have equipment and personnel capable of performing soil borings, installing monitor wells, and testing soil/concrete during construction. Our senior engineering personnel are registered professional engineers in Florida, California, Maine, Massachusetts, and New Hampshire. Combined, they have over 120 years of experience in geotechnical engineering. As a local firm, we have the ability to exercise a great deal of flexibility during the various stages of project development, enabling us to provide a better and more efficient service to our clients, and to maintain direct involvement of the senior personnel on every project. We have worked on many of South Florida's tallest, largest and most notable structures, and over our 35 -plus -year history have successfully completed more than 5,000 projects. Our project experience includes residential, commercial, and industrial developments over soft soils, as well as high-rise development. We have the distinction of providing geotechnical services for a significant number of the major high-rise structures that have been constructed in South Florida. and for the majority of those constructed in Miami. To date our local project portfolio includes some 75 -plus towers, constructed or planned, ranging in height from 20 to 93 stories tall. PROJECT INFORMATION The project site is located on the northwestern corner of the intersection of Collins Avenue and 158th Street in Sunny Isles Beach, Florida. According to the Miami -Dade County Property Appraiser's webpage, the site corresponds to folio numbers 31-2214-004-0180 and 31-2214-008-0071. It is bounded by a parking lot to the north, 158th Street to the south, Collins Avenue to the east, and by a parking lot and the Intracoastal Waterway to the west. The site comprises a rectangle measuring about 115 by 215 feet in plan. It houses a sales center site and a parking lot. We were not provided with site topographic information but estimate site grades to be on the order of +8 feet relative to the 1929 National Geodetic Vertical Datum (NGVD). 14486 Commerce Way I Miami Lakes, FL 33016 1 www.NV5.com I Office 305.666.3563 1 Fax 305.666.3069 CONSTRUCTION QUALITYASSURANCE - INFRASTRUCTURE - ENERGY - PROGRAM MANAGEMENT - ENVIRONMEiNIAL 129 Mr. Mark Castano April 6, 2022 Keith Page 2 Proposal for Geotechnical Study - Proposed Collins & 158th Street Park NV5 Proposal No. 22-0299REV1 We understand the site will be redeveloped with a park comprising a small welcome building with storage and restrooms, new asphalt paving and other hardscape, including multiple game courts, and new landscaping. PURPOSE The purpose of NV5's services on this project will be to perform a subsurface exploration and engineering analyses to provide recommendations for design and construction of the proposed project. PROPOSED SCOPE OF ENGINEERING SERVICES 1. We propose drilling two (2) borings to around 15 to 20 feet below grade at the site. Proposed boring locations are shown with red circles in the image below. Boring locations could shift due to actual site conditions. Further, we note that the site is surface comprises brick pavers. We will attempt to drill in landscaped areas to avoid damaging the pavers. However, this might not be possible and a few pavers could be damaged. The borings will be drilled utilizing the rotary wash method with a truck -mounted drill rig. Samples of the subsurface materials encountered will be collected continuously down to 10 feet below ground surface. Below that depth the sampling will be performed at roughly 5 -foot intervals. Sampling will be performed using a Standard Penetration Test (SPT) sampler per ASTM D-1586. Upon completion of the borings, the boreholes will be grouted to the ground surface. 2. In addition to the borings, we propose performing one (1) field permeability test to provide information for drainage design at the site. The test will be performed to 15 feet below the existing grade in general accordance with the South Florida Water Management District's Usual Open Hole Procedure. Upon completion of the test, the borehole will be abandoned with grout to the ground surface. The test location can be coordinated with the project civil engineer as appropriate. 3. For performing the fieldwork, NV5 will contact Sunshine One Call for advice about the location of underground utilities. Additionally, we require that any other available information regarding N V15 CONSTRUCTION QUALI fY ASSURANGE INFRASTRUCTURE - ENERGY PROGRAiVI iMANAGEMEN 1 - ENVIRONMEMAI- 130 Mr. Mark Castano April 6, 2022 Keith Page 3 Proposal for Geotechnical Study - Proposed Collins & 158th Street Park NV5 Proposal No. 22-0299REV1 the location of underground utilities be provided to us. NV5 cannot be held responsible for damage to below ground structures or utilities that are not identified to us. We specifically request any available information about the location of underground utilities for this project. 4. An NV5 representative will layout test locations based on the furnished drawings. NV5 will perform borings in areas that are indicated to be free from underground utilities. 5. We note that the site is an active facilitv. We will relv on the client to Drovide all necessary site contact information for NV5 to efficiently execute the field work. Site contact name and contact information will be required prior to starting our field work. While NV5 will make reasonable efforts to minimize disruption to any site daily activities, it should be understood that NV5 could need to occupy parking and drive areas for execution of the work. Additionally, drilling is an inherently noisy and messy operation. While NV5 will make reasonable efforts to clean the drill locations upon completion of the work, some soil residue could remain at the ground surface. It is our experience that such soiling is typically washed away by rain showers over time. 6. Based on our field data we will perform engineering analyses and prepare an engineering report with evaluations and discussions of the geotechnical aspects of the proposed development, and provide geotechnical recommendations for design and construction. Specifically, the report will provide: • Drawings showing test locations, a graphic summary of the generalized subsurface conditions, and boring logs with detailed descriptions of the materials encountered. • Discussion of generalized subsurface conditions at the site including groundwater including hydraulic conductivity. • Discussion of feasible foundation type(s) for the proposed construction. • Design parameters for the recommended foundation type, including vertical and lateral load resistance. • Estimates of foundation settlements. • Modulus of subgrade reaction for any slabs on grade • Recommendations for pavement thickness design • Recommendations for site preparation and grading, including the re -use of site -excavated materials for fill, fill placement and compaction, and slab and pavement subgrade preparation. • Construction considerations including excavation support and dewatering, impacts of existing foundations, and impacts for adjacent structures. The report will be signed electronically and sealed by a professional engineer licensed in the State of Florida. COMPENSATION We can complete the scope of services proposed herein for a lumpsum fee of $2,400. The fee assumes access to the test locations will be provided at no cost to us and that the test locations can be accessed with a regular truck -mounted drill rig. The fee does not include any site restoration beyond grouting of the test holes to the ground surface. NV5 CONSTRUCTION QUALIIYASSURANCE INFRASIRUCF[JRE - ENERGY - PROGRAM iNIANAGEMENT - ENVIRONMENIAI. 131 Exhibit '& SGM ENGINEERING March 30'", 2022 Mark Castano, PE Director of Civil Engineering Office: 954.788.3400 1 Mobile: 954.235.5112 Email: MCastano@keithteam.com www.KEITHteam.com 5805 Blue Lagoon Dr Suite 285 Miami, Florida 33126 (954) 421-1944 (954) 421-1924 fax www.sgmengineering.com Reference: Proposal # 2022-XXXX; City of Sunny Isles Beach - Ritz Carlton Sales Center Park Dear Mark, It is our pleasure to provide electrical engineering services for the design documents of the new lighting system added to illuminate the new pickle ball and multi -sports courts added for the Ritz Carlton Sales Center Park located in the City of Sunny Isles Beach in Florida. Scope of Professional Services: ➢ Visit the sites where the new courts are going to be installed to investigate and survey the following conditions of the area: o Record all existing electrical utilities in the area that are required to be removed or relocated to make space for the new courts. ➢ Provide design for new electrical underground branch circuits (conduit and wire) for the sports court lighting poles added to the pickle ball and multi - sports courts. ➢ Provide lighting fixture schedules for all sports lighting. ➢ Provide selection of code complaint (wind load) parking lot poles with associated bases and underground boxes. ➢ Provide new panelboards and circuit breakers at existing buildings for source of power for all lighting fixtures and irrigation equipment. ➢ Design documents will include electrical book of construction specifications. Commissioning LEED ➢ Fundamental and enhanced commissioning are excluded. These services can be provided by SGM at additional cost. 5805 Blue Lagoon Drive ■ Suite 285 ■ Miami, FI 33126 ■ 954-421-1944 ■ www.SGMEngineering.com 132 Page 2 of 3 ➢ LEED administration or design services are not included in this proposal. These services can be provided by SGM at additional cost. Exclusions Codes ➢ Construction Administration is excluded from our scope of services. ➢ Progress cost estimates of construction cost are excluded from our scope of services. ➢ Redesign to provide for VE ideas to be incorporated. ➢ Competitive bid: Preparation of bid, submission of bid, selection/award of bid is excluded from our scope of services. ➢ Any permitting cost including but not limited to application fees, agency fees, impact fees and environmental fees. ➢ Multiple alternates for the design are not included unless specifically included. Any alternates will need to be provided as additional services since it is additional design scope. ➢ Multiple phases of construction documents are not included unless specifically stated. Breaking the project into multiple design phase submissions will require additional services to account for the additional cost to perform the additional submissions. ➢ Plans and specifications will be in accordance with the Florida Building Code 7t" Edition and Florida Fire Prevention Code 7t" Edition. Schedule ➢ TBD. Deliverables. ➢ Five (5) sets of 100% construction/ permit drawings. ➢ One set of final documents on disk (pdf or CADD). ➢ Submittal review comments. ➢ Site visit comments, only if there is an issue. ➢ Conformed plans for submission to Building Department at completion. Compensation ➢ SGM is pleased to provide the described professional services for a lump sum fee of Four Thousand One hundred Dollars ($ 4,100). ➢ Reimbursable expenses including but not limited to travel, lodging, per diem, postage, printing/plotting, courier, and delivery shall be invoiced at cost. ➢ Keep below if required by Owner, otherwise move to the add services section. 5805 Blue Lagoon Drive ■ Suite 285 ■ Miami, FI 33126 ■ 954-421-1944 ■ www.SGMEngineering.com 133 Page 3 of 3 Additional Services ➢ Any additions to this scope of services, including but not limited to an increase in the scope of the project, revisions, construction errors, additional site visits and inspections will be provided for an additional negotiated fee or on an hourly basis in accordance with the billing rates shown above. ➢ Hourly rates are subject to change after 2 years from the date of this proposal. Payments for Engineering Services ➢ Monthly progress billings for professional services will be submitted based on percent complete for each task. ➢ Payment is due upon presentation and considered past due 30 calendar days after the date of the billing. If you need any additional information or would like the scope modified, please let me know. Sincerely SGM ENGINEERING, INC. Manuel Hernandez, P.E. Project Manager 5805 Blue Lagoon Drive ■, Suite 285 ■ Miami, FI 33126 ■ 954-421-1944 ■ www.SGMEngineering.com 134 0 5 KEITH Engineering Inspired Design. CONTRACT ADDENDUM WORK AUTHORIZATION PURSUANT TO THE CONTINUING PROFESSIONAL ENGINEERING SERVICES AGREEMENT BETWEEN THE CITY OF OF SUNNY ISLES BEACH AND KEITH AND ASSOCIATES, INC. (KEITH) October 6, 2022 Richard Labinsky, PE, City Engineer City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Phone: (305) 947 — 0606 E-mail: rlabinsky(-)sibfl.net Project Name: Intracoastal Sports Court Complex - (formerly Ritz Sales Trailer Site) Project Location: 15800 Collins Ave. Sunny Isles Beach, FL 33160 KEITH Project Number: 11723.02 Contract Addendum: 01 Project Manager: Sarah Landucci PROJECT UNDERSTANDING The City of Sunny Isles Beach (CITY/OWNER/CLIENT) has requested that KEITH (CONSULTANT) provide Civil Engineering and Landscape Architecture professional services for the expansion of a new park known as Intracoastal Sports Court Complex located at the former Ritz Carlton Sales Trailer site to also include the property to the north (identified within Folio #31-2214-008-0080 and the east portion of Folio #31-2214-013-0010, owned by Century Towers Association). The total combined park property is being expanded from 0.70 acres to 1.50 acres approximately. The additional proposed improvements to the expanded area shall consist of: 1. One-way parking lot running north to south with entrance and exit off Collins Avenue (S.R. A1A). 2. Install at least one (1) multiuse court (with lighting) that allow tennis / basketball / volleyball where the existing parking lot within the City owned property currently exists. 3. Floating dock for kayak and paddle board launch. 4. Exercise Equipment / Work-out Stations. 5. The rest of the improvements are to be in line with the previous Work Authorization. Per the CLIENT, the following professional services are to be included in the proposal: 1. Additional Surveying by KEITH 2. Additional Civil Engineering by KEITH 3. Additional Landscape Architecture by KEITH 4. Additional Geotechnical Testing by subconsultant (NV -5) 5. Additional Site Lighting by subconsultant (SGM) 6. Additional Environmental Permitting for dock by subconsultant (The Chappell Group, Inc.) Per the CLIENT, the following deliverable/phases are to be included in the proposal: • Overall Master Plan • Phase 1 - Design Development Plans (including Civil and Landscape). www.KEITHteam.com Pompano Beach (HQ) • Fort Lauderdale • Miami • West Palm Beach e Orlando 135 Page 2 of 9 11723.02 — Intracoastal Sports Court Complex - (formerly Ritz Sales Trailer Site) City of Sunny Isles Beach • Phase 2 - Initial Construction Documents (60% CDs) for Outside Agency Permitting • Phase 3- Final Construction Documents (100% CDs) Project Areas — Site Map DESCRIPTION OF ADDITIONAL SERVICES SURVEY SERVICES Task 103 Additional Boundary and Topographic Survey KEITH shall prepare a Boundary and Topographic Survey of the site. The Boundary Survey shall show the boundary lines of the property owned by Century Towers Association (Folio #31-2214-008-0088 and the east portion of Folio #31-2214-013-0010) depicted in yellow. The Topographic Survey shall include the surface improvements such as roadways, pavement, sidewalks, traffic striping, walls, fences, surface utilities, etc. Trees shall be noted by common name and trunk diameter. Storm and Sanitary structures shall be noted with the pipe invert elevation, diameter, material, and direction. The topography shall include the area depicted in yellow in the aerial. Elevations shall be shown at an interval of approximately 50 feet, Engineering Inspired Design. 136 Page 3 of 9 11723.02 — Intracoastal Sports Court Complex - (formerly Ritz Sales Trailer Site) City of Sunny Isles Beach including intermediate changes in grade. Note: Vertical Datum for this survey shall be NGVD 1929 unless otherwise directed by Client and the Horizontal Datum shall be NAD 83/2011. Task 104 Additional Existing Easement Research (By Subconsultant - Paramount Title Services) — Optional Services The Subconsultant (Paramount Title Services) will prepare an on-site easement and adjoining right-of- way search of the property owned by Century Towers Association (Folio #31-2214-008-0088 and the east portion of Folio #31-2214-013-0010) depicted in yellow for the park expansion. This is not a tittle commitment. Results of such search will be provided to KEITH to include as part of the Boundary and Topographic Survey. This task is offered as Optional Services in lieu of the City/Client supplying KEITH with all documents covering easements, encumbrances, Title Commitment, and exception documents referenced therein. Survey will include review, depiction and/or notation of applicable documents. SUBSURFACE UTILITY ENGINEERING (SUE) SERVICES Subsurface Utility Engineering (SUE) Services including horizontal designation, utility location, utility mapping and franchise utility coordination are not included in this scope of work. If required, the CONSULTANT will be pleased to provide additional services under a separate agreement. GEOTECHNICAL ENGINEERING SERVICES (By Geotechnical Sub. — NV5) Refer to Exhibit A — NV5 (Sub -Consultant) Geotechnical Engineering Services Scope and Fees. Task 202 Additional Geotechnical Testing and Reporting (By Geotechnical Sub. - NV5) The geotechnical subconsultant (NV5) will provide geotechnical engineering testing and reporting services for the property owned by Century Towers Association (Folio #31-2214-008-0088 and the east portion of Folio #31-2214-013-0010) depicted in yellow. 1. NV5 proposes to drill two (2) additional borings to around 15 to 20 feet below grade at the site. Proposed boring locations are shown with red circles in the image below. Boring locations could shift due to actual site conditions. The borings will be drilled utilizing the rotary wash method with a truck -mounted drill rig. Samples of the subsurface materials encountered will be collected continuously down to 10 feet below ground surface. Below that depth the sampling will be performed at roughly 5 -foot intervals. Sampling will be performed using a Standard Penetration Test (SPT) sampler per ASTM D-1586. Upon completion of the borings, the boreholes will be grouted to the ground surface. Engineering Inspired Design. 137 r Page 4 of 9 11723.02 — Intracoastal Sports Court Complex - (formerly Ritz Sales Trailer Site) City of Sunny Isles Beach 2. In addition to the borings, we propose performing one (1) additional field permeability tests to provide information for drainage design at the site. The tests will be performed to 15 feet below the existing grade in general accordance with the South Florida Water Management District's Usual Open Hole Procedure. Upon completion of the tests, the boreholes will be abandoned with grout to the ground surface. Test locations can be coordinated with the project civil engineer as appropriate. 3. For performing the fieldwork, NV5 will contact Sunshine One Call for advice about the location of underground utilities. Additionally, we require that any other available information regarding the location of underground utilities be provided to us. NV5 cannot be held responsible for damage to below ground structures or utilities that are not identified to us. We specifically request any available information about the location of underground utilities for this project. 4. An NV5 representative will layout test locations based on the furnished drawings. NV5 will perform borings in areas that are indicated to be free from underground utilities. 5. We note that the site is an active facility. We will rely on the client to provide all necessary site contact information for NV5 to efficiently execute the field work. Site contact name and contact information will be required prior to starting our field work. While NV5 will make reasonable efforts to minimize disruption to any site daily activities, it should be understood that NV5 could need to occupy parking and drive areas for execution of the work. Additionally, drilling is an inherently noisy and messy operation. While NV5 will make reasonable efforts to clean the drill locations upon completion of the work, some soil residue could remain at the ground surface. It is our experience that such soiling is typically washed away by rain showers over time. 6. Based on our field data we will perform engineering analyses and prepare an engineering report with evaluations and discussions of the geotechnical aspects of the proposed development, and provide geotechnical recommendations for design and construction. Specifically, the report will provide: • Drawings showing test locations, a graphic summary of the generalized subsurface conditions, and boring logs with detailed descriptions of the materials encountered. • Discussion of generalized subsurface conditions at the site including groundwater including hydraulic conductivity. • Discussion of feasible foundation type(s) for the proposed construction. • Design parameters for the recommended foundation type, including vertical and lateral load resistance. • Estimates of foundation settlements. • Modulus of subgrade reaction for any slabs on grade. • Recommendations for pavement thickness design • Recommendations for site preparation and grading, including the re -use of site -excavated materials for fill, fill placement and compaction, and slab and pavement subgrade preparation. • Construction considerations including excavation support and dewatering, impacts of existing foundations, and impacts for adjacent structures. The report will be signed electronically and sealed by a professional engineer licensed in the State of Florida. 1 V Engineering Inspired Design. 138 Page 5 of 9 11723.02 — Intracoastal Sports Court Complex - (formerly Ritz Sales Trailer Site) City of Sunny Isles Beach PLANNING SERVICES Task 302 Conceptual Site Plan KEITH will develop up to three (3) revised Conceptual Design options for the City's review including the park expansion area of the property owned by Century Towers Association (Folio #31-2214-008-0088 and the east portion of Folio #31-2214-013-0010) depicted in yellow. Concepts will be communicated to the Team and various stakeholders for review and discussion. KEITH will develop concepts that will be preliminary in nature and are not intended as construction documents. They will be presented in a draft and final presentation allowing input and development of the ideas. These findings will then be developed into a conceptual presentation with the overall team for review/approval of the CLIENT. Deliverables 1. KEITH will develop up to three (3) Conceptual Design concepts for client review. Based on client feedback, up to two (2) revisions will be developed to define the preferred design direction to be moved forward into the Design Development phase. Concept package shall include: a. Illustrative Site Plan(s) b. Supporting Diagrams and/or Section Elevations c. Character Imagery 2. Meetings and Team Coordination — During the specified duration in the project schedule, KEITH will attend all required meetings and coordination. It is assumed all meetings will be in South Florida. Task 303 Additional Site Plan and Processing Once the City has selected the preferred concept which includes the park expansion area of the property owned by Century Towers Association (Folio #31-2214-008-0088 and the east portion of Folio #31-2214- 013-0010) depicted in yellow, KEITH shall prepare one (1) dimensioned / detailed Site Plan to be processed through the City. CIVIL ENGINEERING SERVICES Task 404 Additional Preliminary Engineering / Design Development Plans The Preliminary Plans are for CITY and/or City's Planning and Development Services Department to review and approve the preliminary design including the park expansion area of the property owned by Century Towers Association (Folio #31-2214-008-0088 and the east portion of Folio #31-2214-013-0010) depicted in yellow. Task 405 Additional Engineering Construction Documents (CD) KEITH shall prepare Engineering Construction Documents (CDs) that includes the park expansion area of the property owned by Century Towers Association (Folio #31-2214-008-0088 and the east portion of Folio #31-2214-013-0010) depicted in yellow. Task 406 Additional Engineering Permitting KEITH shall provide additional engineering permitting that includes the park expansion area of the property owned by Century Towers Association (Folio #31-2214-008-0088 and the east portion of Folio #31-2214-013-0010) depicted in yellow. Engineering Inspired Design. 139 0 Page 6 of 9 11723.02 — Intracoastal Sports Court Complex - (formerly Ritz Sales Trailer Site) City of Sunny Isles Beach ELECTRICAL ENGINEERING DESIGN SERVICES (By Electrical Sub. - SGM Engineering) Refer to Exhibit B — SGM Engineering (Sub -Consultant) Electrical Engineering Services Scope and Fees. Task 502 Additional Electrical Construction Documents (CD) (SGM Engineering - Electrical Sub.) The electrical subconsultant (SGM) will provide additional electrical engineering services for the design documents of the new lighting system to illuminate the park expansion area of the property owned by Century Towers Association (Folio #31-2214-008-0088 and the east portion of Folio #31-2214-013-0010) depicted in yellow. ENVIRONMENTAL CONSULTING & PERMITTING SERVICES (By Environmental Consultant — The Chappell Group, Inc) Task 601 Environmental Consulting & Permitting Services The environmental subconsultant (The Chappell Group, Inc) will provide design and permitting services for a floating dock. Services include a benthic survey, structural plans of a fixed platform no more than 10'x10', and permitting thru Army Corp of Engineers, Florida Department of Environmental Protection, and Miami - Dade County Department of Regulatory & Economic Resources. Mangrove impacts, mitigation, and processing of sovereign submerged lands lease is not included. Structural plans of the floating dock are to be prepared by the manufacturer. Bidding and Construction Services are not included. LANDSCAPE ARCHITECTURE SERVICES Task 704 Additional Preliminary Landscape / Design Development Plans KEITH shall prepare Preliminary Landscape / Design Development Plans that includes the park expansion area of the property owned by Century Towers Association (Folio #31-2214-008-0088 and the east portion of Folio #31-2214-013-0010) depicted in yellow. Task 705 Additional Tree Inventory and Appraisal by Certified Arborist KEITH will visit the project to confirm and evaluate the location, size, and quality of existing trees on the expanded project site and identify which trees shall be removed or relocated, as well as any remaining trees that will require protection including the park expansion area of the property owned by Century Towers Association (Folio #31-2214-008-0088 and the east portion of Folio #31-2214-013-0010) depicted in yellow. Task 706 Additional Landscape Construction Documents KEITH shall prepare Landscape Construction Documents (CDs) that includes the park expansion area of the property owned by Century Towers Association (Folio #31-2214-008-0088 and the east portion of Folio #31-2214-013-0010) depicted in yellow. CONSTRUCTION / PROJECT MANAGEMENT SERVICES Construction / Project Management Services are not included in this scope of work. If required, the CONSULTANT will be pleased to provide additional services under a separate agreement. Engineering Inspired Design. 140 i► Page 7 of 9 11723.02 — Intracoastal Sports Court Complex - (formerly Ritz Sales Trailer Site) City of Sunny Isles Beach PROJECT SCHEDULE Subsequent to the issuance of a Purchase Order from the CITY, CONSULTANT shall commence work on the project. We anticipate commencing work within 5 business days from notice to proceed, completing the prescribed work within six (6) months. Table 1 Schedule Estimate of Services TASK DURATION Task 103 — Additional Boundary and Topographic Survey 6 weeks Task 104 — Additional Existing Easement Research (By Subconsultant - Paramount Title Services) — Optional Services 4 weeks Task 202 — Additional Geotechnical Testing and Reporting (By Geotechnical Sub. — NV5) Concurrent with Task 103 Task 302 — Conceptual Site Plan 1 month Task 303 — Additional Site Plan and Processing 2 months Task 404 — Additional Preliminary Engineering / Design Development Plans 1 month Task 405 —Additional Engineering Construction Documents 3 months Task 406 —Additional Engineering Permitting 2 to 3 months Task 502 — Additional Electrical Construction Documents (CD) (By Electrical Sub. - SGM Engineering) Concurrent with Task 405 Task 601 — Environmental Consulting & Permitting Services (By The Chappell Group, Inc) 8-12 months Task 704 — Additional Preliminary Landscape / Design Development Plans Concurrent with Task 404 Task 705 — Additional Tree Inventory and Appraisal by Certified Arborist Concurrent with Task 404 Task 706 — Additional Landscape Construction Documents Concurrent with Task 405 CITY'S RESPONSIBILITY The CITY shall assist CONSULTANT with the following items to expedite the completion of the project in an effective manner. A. Designate a representative(s) who shall have the authority to transmit instruction, receive information and enunciate policies and decisions. B. Provide access to and obtain permission for CONSULTANT to enter upon public lands as required at no additional cost to perform observations or other necessary services under this Agreement. Engineering Inspired Design. 141 tI Page 8 of 9 11723.02 — Intracoastal Sports Court Complex - (formerly Ritz Sales Trailer Site) City of Sunny Isles Beach C. Make available to CONSULTANT all existing information which may in any way be pertinent to the project. D. Assist in contacting all permitting agencies to facilitate expediting reviews and/or approvals. ADDITIONAL SERVICES Consultant shall not perform any additional services without the written consent of the CITY. Services performed beyond the Scope of Services described above shall be considered additional services and will be presented to the CITY as an Addendum to this Agreement prior to initiating the work. Additional services shall be invoiced on a time and material basis in accordance with our current Professional Service Fee Schedule or on a lump sum basis if a scope of service can be defined. COMPENSATION Consultant shall invoice the City for services rendered under this Agreement on a lump sum basis, unless otherwise stated, and in accordance with the terms and conditions of the Continuing Services Agreement for Professional Engineering Services between the City of Sunny Isles Beach and KEITH. 0 Engineering Inspired Design. 142 Page 9 of 9 11723.02 — Intracoastal Sports Court Complex - (formerly Ritz Sales Trailer Site) City of Sunny Isles Beach Table 2 Budget Estimate of Engineering Services TASK FEE Task 103 — Additional Boundaryand Topographic Surve Y $7,500(Lump Sum Task 104 — Additional Existing Easement Research (By Subconsultant - Paramount Title Services) — Optional Services $1,350 (Lump Sum) Task 202 — Additional Geotechnical Testing and Reporting (By Geotechnical Sub. - NV5) $2,400 (Lump Sum) Task 302 — Conceptual Site Plan $8,500(Lump Sum Task 303 — Additional Site Plan Preparation and Processing $5,500(Lump Sum Task 404 — Additional Preliminary Engineering / Design Development Plans $3,500 (Lump Sum) Task 405 —Additional Engineering Construction Documents $4,200(Lump Sum Task 406 —Additional Engineering Permitting $3,500(Lump Sum Task 502 — Additional Electrical Construction Documents (CD) (By Electrical Sub. - SGM) $2,500 (Lump Sum) Task 601 — Environmental Consulting & Permitting Services (By Environmental Subconsultant) $30,000 (Lump Sum) Task 704 — Additional Landscape Design Development Plans $3,800(Lump Sum Task 705 — Additional Tree Inventory and Appraisal by Certified Arborist $2,200 (Lump Sum) Task 706 — Additional Landscape Construction Documents $7,000(Lump Sum CONSULTANT'S TOTAL COMPENSATION $81,950 (Lump Sum) DIRECT EXPENSES / REIMBURSABLES $1,000 (Time and Materials) TOTAL FEE $82,950 "CITY": CITY OF SUNNY ISLES BEACH CONSULTANT: KEITH By: By: ALEX LAZOWICK President Engineering Inspired Design. 143 1 EXHIBIT "T' FEESCHEDULE 144 � KEITH CITY OF SUNNY ISLES BEACH - PROFESSIONAL SERVICE FEE SCHEDULE Hourly Rate ProjectExecutive......................................................................................................................... $350.00 ExpertWitness.............................................................................................................................$500.00 GovernmentLiaison..................................................................................................................... $400.00 SeniorProject Manager............................................................................................................... $225.00 ProjectManager III....................................................................................................................... $175.00 ProjectManager 11........................................................................................................................ $140.00 ProjectManager I......................................................................................................................... $120.00 Assistant Project Manager........................................................................................................... $100.00 SeniorTraffic Engineer................................................................................................................ $175.00 TrafficEngineer............................................................................................................................ $125.00 EngineerIII.................................................................................................................................. $110.00 EngineerII................................................................................................................................... $100.00 EngineerI................................................................................................................................... $90.00 Senior Construction Manager...................................................................................................... $180.00 ConstructionManager.................................................................................................................. $150.00 EngineeringInspector III.............................................................................................................. $125.00 EngineeringInspector II............................................................................................................... $100.00 EngineeringInspector I................................................................................................................ $90.00 ChiefSurveyor............................................................................................................................. $175.00 SeniorSurveyor & Mapper.......................................................................................................... $150.00 ProjectSurveyor II....................................................................................................................... $125.00 ProjectSurveyor I........................................................................................................................ $110.00 TechnicianIII............................................................................................................................... $100.00 TechnicianII................................................................................................................................ $90.00 TechnicianI................................................................................................................................. $80.00 SeniorPlanner............................................................................................................................. $140.00 PlannerII.................................................................................................................................... $120.00 PlannerI..................................................................................................................................... $100.00 Senior Landscape Architect......................................................................................................... $150.00 LandscapeArchitect.................................................................................................................... $135.00 Arborist....................................................................................................................................... $140.00 LandscapeDesigner III................................................................................................................ $125.00 LandscapeDesigner II................................................................................................................. $100.00 LandscapeDesigner I.................................................................................................................. $90.00 ChiefUtility Coordinator............................................................................................................... $160.00 SeniorUtility Coordinator............................................................................................................. $140.00 UtilityCoordinator........................................................................................................................ $100.00 Subsurface Utility Location Manager........................................................................................... $140.00 Subsurface Utility Field Supervisor.............................................................................................. $90.00 Utility Designating/GPR............................................................................................................... $200.00 SurveyCrew IV............................................................................................................................ $160.00 SurveyCrew III............................................................................................................................ $130.00 SurveyCrew II............................................................................................................................. $110.00 SurveyCrew I.............................................................................................................................. $90.00 Survey Static Laser Scanning...................................................................................................... $250.00 Survey Terrestrial Mobile LiDAR............................................................................................ Per Project SurveyDrone Photos...................................................................................................................$200.00 Impervious Coring>8........................................................................................................... $150.00/Each Vacuum Excavation Test Hole (Pervious Surface)....................................................$350.00/Each Vacuum Excavation Test Hole (Impervious Surface).................................................$450.00/Each Administrative Assistant II............................................................................................................ $80.00 Administrative Assistant I............................................................................................................. $60.00 Effective 01/01/2021 www.KEITHteam.com pompano beach (HQ) e fort Lauderdale • miami • west palm beach e orlando • tallahassee 145 Ty QF SU'H h City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, Florida 33160 (305) 947-0606 City Hall (305) 949-3113 Fax MEMORANDUM TO: Honorable Mayor and City Commissioners VIA: Stan Morris, City Manager FROM: Rick Labinsky, P.E., City Engineer DATE: December 15, 2022 RE: Agreement with Keith and Associates, Inc. for Professional Civil Engineering Services for Intracoastal Courtsports Complex RECOMMENDATION: Staff recommends approval of this Resolution. REASONS: The City of Sunny Isles Beach desires to develop a master site plan for the parcel of land adjacent tc and north of the Intracoastal Court Sports Complex park which the City will be receiving form the developer as part of the Marina One project. Consultant Keith Engineering Services are currently working on the ICCS Park and are qualified to provide the site planning services for this additiona area. Consultant has agreed to provide service in an amount not to exceed $161,400.00, which includes $4,500.00 in reimbursable expenses. Pursuant to the provisions contained in the Continuing Services Agreement between the City of Sunm Isles Beach ("City") and Keith Engineering Services ("Consultant") for Professional Civil Engineerin Services pursuant to Request for Qualifications No. 20-07-01 and Resolution No. 2021-3160, authorizes the Consultant to provide such services. FUNDING SOURCE: Funds have been appropriated in account no. 300-6-5720-465000-45000. ATTACHMENTS: Resolution Agreement Item Number: 10.6 100 Item Number: 10.6 101