HomeMy WebLinkAboutSoutheastern Disaster Preparation Guide and Recovery Plan Page 1 of 26 Revision Date: 09/28/2022 Document #: QOP 100.01
Southeastern Printing
Disaster Preparation Guide
& Recovery Plan
950 SE 8th St.
725 SE 9th Ct.
Hialeah, FL 33010
Page 2 of 26 Revision Date: 09/28/2022 Document #: QOP 100.01
The purpose of this manual is to provide procedures that will maximize the safety of the Company and
its employees, ensure effective communication with employees and Clients and ensure continuity of
supply and protection of Client assets in the event of a disaster or a weather emergency. Since each
department has equipment and tasks that are specific to that department, procedures have been written
for each department, along with overall procedures that pertain to plant operations.
In the event of a Hurricane Watch, meetings with all department supervisors and managers will be held
to coincide with the updates as provided by the National Hurricane Center, updates and advisories are at
11 am and 5 pm. The purpose of the meetings will be to determine if and when the procedures described
in the following pages will be administered. These meetings will continue until the watch is
discontinued or until a Hurricane Warning is issued at which point all employees will be sent home and
the decision is made to close down.
Page 3 of 26 Revision Date: 09/28/2022 Document #: QOP 100.01
Table of Contents
1 PRE-DISASTER OVERALL PLANT PREPARATION ........................................................................................................... 4
1.1 HURRICANE SUPPLY LIST ...................................................................................................................................................... 4
1.2 AT THE ONSET OF HURRICANE SEASON ................................................................................................................................... 4
1.3 24-72 HOURS PRIOR TO HURRICANE SEASON .......................................................................................................................... 4
1.4 24 HOURS PRIOR ............................................................................................................................................................... 5
1.5 AT TIME OF EVACUATION ..................................................................................................................................................... 5
2 BUILDING MASTER KEY HOLDERS ............................................................................................................................... 5
3 DEPARTMENT PREPARATIONS .................................................................................................................................... 6
3.1 IT CHECKLIST ..................................................................................................................................................................... 6
3.1.1 IT CRITIAL OPERATIONS........................................................................................................................................ 6
3.2 ACCOUNTING CHECKLIST ...................................................................................................................................................... 7
3.2.1 Work Area Inspection Report .............................................................................................................................. 8
3.2.2 Storm Preparation Time Sheet ............................................................................................................................ 9
3.2.3 Employee Timekeeping Sheet ........................................................................................................................... 10
3.3 PREPRESS CHECKLIST ......................................................................................................................................................... 11
3.4 PRESSROOM CHECKLIST ..................................................................................................................................................... 11
3.5 BINDERY CHECKLIST .......................................................................................................................................................... 11
3.6 WAREHOUSE AND SHIPPING 950 CHECKLIST ......................................................................................................................... 12
3.7 WAREHOUSE AND SHIPPING AXIS PARK CHECKLIST ................................................................................................................. 12
3.8 WIDE FORMAT CHECKLIST .................................................................................................................................................. 13
3.9 HUMAN RESOURCES CHECKLIST .......................................................................................................................................... 13
3.10 MAILING AND DATA PROCESSING CHECKLIST .................................................................................................................... 14
3.11 DIGITAL CHECKLIST ...................................................................................................................................................... 14
4 POST DISASTER ......................................................................................................................................................... 15
4.1 GENERAL ........................................................................................................................................................................ 15
5 RESOURCE PLAN ....................................................................................................................................................... 17
5.1 KEY STAFF PHONE LIST ...................................................................................................................................................... 17
5.2 KEY STAFF BACK-UP PLAN .................................................................................................................................................. 17
5.3 ALTERNATE PRODUCTION RESOURCES .................................................................................................................................. 18
5.4 APPROVED PEER NETWORK LOCATIONS ................................................................................................................................ 18
5.5 COASTAL PRINTING ........................................................................................................................................................... 19
5.6 PHONE SYSTEM DOWN ...................................................................................................................................................... 19
5.7 CORE COMPUTER SYSTEM DOWN ........................................................................................................................................ 20
5.8 DELIVERY OF MATERIALS .................................................................................................................................................... 22
5.9 OUTBOUND CARRIERS ....................................................................................................................................................... 23
5.10 TIME CLOCK ............................................................................................................................................................... 23
6 CLIENT COMMUNICATION AND DATA PROTECTION ................................................................................................. 24
7 IMPORTANT CONTACT INFORMATION ..................................................................................................................... 25
7.1 FPL ............................................................................................................................................................................... 25
7.2 LOCAL HOSPITALS ............................................................................................................................................................. 25
7.3 SMALL BUSINESS ADMINISTRATION ...................................................................................................................................... 25
7.4 FEMA ........................................................................................................................................................................... 25
7.5 INSURANCE AGENT ........................................................................................................................................................... 25
8 REVISION HISTORY ................................................................................................................................................... 26
Page 4 of 26 Revision Date: 09/28/2022 Document #: QOP 100.01
1 Pre-Disaster Overall Plant Preparation
1.1 Hurricane Supply List
The Hurricane Supply list is reviewed against the supplies on hand, prior to hurricane seasons to
determine if any materials need replenished. Proposed purchases are reviewed by Executive
Leadership for approval and the order is placed.
1.2 At the Onset of Hurricane Season
Responsible Party Date Completed
Review Hurricane Supply /Disaster Recovery List
against inventory of items to determine if items need
replenished. Nick Mader
Update Employee phone list/distribute Joann Villanueva
Stock an ample supply of water Erika Fischer
Obtain water removal equipment Nick Mader
Ensure adequate flashlights, extension cords, batteries,
and plastic sheeting Nick Mader
Obtain absorbent material for under doors Nick Mader
1.3 24-72 hours Prior to Hurricane Season
24 - 72 hrs prior to hurricane: Responsible Party Date
Completed
Set-up answering machine Carl VonWerder
Prepare Client notification and social media blast Patricia Dolaway
Purchase fuel for generator(s) Nick Mader
Reserve large generator(s) for equipment Nick Mader
Print open orders by customer Mary Jo Lynch
Print open orders by sales rep Mary Jo Lynch
Devise a machine operator schedule Don Lewis
Create signage for front door and appoint person
in charge of posting relevant info Kelly Lopez
Set-up storm job # in Monarch and distribute job
# to supervisors for logging time spent on clean
up and repair Mary Jo Lynch
Prepare and service generator(s) Nick Mader
Fuel all trucks Nick Mader
Board up windows/doors remove awning Nick Mader
Remove potential flying objects around
building/parking lot
Nick Mader
Have roll off dumpster dumped Nick Mader
Band A/C units on roof Nick Mader
Cover roof vents with plastic Nick Mader
Charge all forklifts Nick Mader/ Joseph Falcon
Page 5 of 26 Revision Date: 09/28/2022 Document #: QOP 100.01
24 - 72 hrs prior to hurricane; continued Responsible Party Date Completed
Shut-down all non-essential equipment at circuit
breakers
Nick Mader
Tie down generator(s) Nick Mader
Store recycling bails in trucks Nick Mader
Call gas company, top off tanks for forklifts Nick Mader
Move some lighting ckts to 440 volts Nick Mader
Take video of the facilities: inside, outside and roof Franz Fernandez
Print off manual schedules for each department Richard Davy
1.4 24 Hours Prior
24 prior to hurricane:
Responsible Party Date Completed
Install absorbent material around all doors Nick Mader
1.5 At time of Evacuation
At time of evacuation
Responsible Party Date Completed
Lock all doors to the facility Franz Fernandez
2 Building Master Key Holders
Christine Bitner
Franz Fernandez
Page 6 of 26 Revision Date: 09/28/2022 Document #: QOP 100.01
3 Department Preparations
3.1 IT Checklist
Primary Responsibility: Amanda/ Carl/ DIT
24 - 72 hrs prior to hurricane: Assigned To: Date Completed
COMPUTER DATA
Images/backups of key systems (outside of servers) are up
to date and saved to Veeam backup server Carl VonWerder / DIT
Key system identification, location and function document
is up to date Carl VonWerder / DIT
Back up the database and store offsite. Carl VonWerder / DIT
SERVER DATA
Veeam server backups are current and include computer
data (above) Carl VonWerder / DIT
USB Drive or VPN replication of all Veeam backup data is
exported or physically removed from environment.. Carl VonWerder / DIT
SERVER ROOM
Sever Room shut down Carl VonWerder / DIT
3.1.1 IT Critical Operations
The following is a prioritized list of our critical operations before a storm:
Determine with MGMT when plants will be shutting down with incoming storm. Schedule backups
ahead of time to ensure that there is enough time for a final backup before environment is shut
down. 1) Run a Current Veeam Backup for all VMs on server veaam-mia 2) Shutdown All VM’s in Miami thru vSphere (IP: 192.168.152.249) or Host: 10.232.32.30 &
10.232.32.234 > BCC-Mailing, BCC-VWS, EFI-ACPM, FS4-MIA, FS-FDMAIL, PSS1-Mia, Sep-
Mia-DC1 last 3) ILO or direct connect to physical servers 10.232.32.30, 20 and 234 and shut down all ESX-I hosts
(Stuart plant shutting down after) 4) Log into physical Server/WS impoproof-mia, dodd-javelin, rampage server and shut down 5) Perform a physical back up of the main UPS and Fed Ex Machines in Axis Park 6) Power off printers 7) Cover server and switch Rack with plastic 8) Leave switches and firewall up and running. This will allow us to maintain edge connectivity for as
long as possible as these devices will not consume much power on battery backups.
The following is a prioritized list of our critical operations after a storm
1) Un-Cover plastic from server and switch Rack
2) Power on VMware Servers (10.232.32.30) and (10.232.32.234)
3) Power on physical Server/WS impoproof-mia, dodd-javelin, rampage server
4) Power on All VM’s in Miami thru vSphere (IP: 192.168.152.249) or Host: 10.232.32.30 &
10.232.32.234 > BCC-Mailing, BCC-VWS, EFI-ACPM, FS4-MIA, FS-FDMAIL, PSS1-Mia, Sep-Mia-
DC1
5) Power on printers
IT SERVICES
Page 7 of 26 Revision Date: 09/28/2022 Document #: QOP 100.01
Keep all mission critical systems in service as long as possible. However, certain services might need to
be brought off-line and/or shutdown before the storm hits. This is necessary to ensure that equipment
and services are safe from the effects of the storm.
3.2 Accounting Checklist
Primary Responsibility: Rob Cawthon
24 - 72 hrs prior to hurricane: Assigned To: Date Completed
Distribute the timesheet memo to all employees to track
storm preparation time and expense.
Print two copies of the following reports. Distribute to
two separate individuals to store off-site.
• Fixed Asset Depreciation Report
• Open Purchase Order Report
Back up the database and store offsite.
Immediately Prior:
Distribute the Work Area Preparation Checklist to
employees.
Distribute the Work Area Inspection Report to
employees.
Distribute a memo to departmental employees
requesting applicable phone numbers for after the storm.
Ask all employees to check in once the storm has
passed. Make sure that all departmental employees
understand the plan for returning to work.
In Monarch, set up a Storm job number and distribute
the job number to supervisors with instructions to have
employees working on cleanup and repair, to record all
time using this job number. Set up a Storm project # to
track all AP invoices related to the storm.
Page 8 of 26 Revision Date: 09/28/2022 Document #: QOP 100.01
3.2.1 Work Area Inspection Report
Please distribute this report to all employees immediately prior to and/or immediately
after the loss event.
To all Employees: Please complete this form and return it to Accounting immediately
upon completion. Make sure that whoever is around takes photographs prior to
beginning repairs. Please also carefully track expenses (purchase orders, estimates
and invoices) for repair and replacement.
Thank you for your cooperation.
Employee: ____________________ Department: ____________________
Zone: ________________________ Date: __________________________
Damages Date for Repair Cost
____________________________ ____________ ______________
____________________________ ____________ ______________
____________________________ ____________ ______________
____________________________ ____________ ______________
____________________________ ____________ ______________
____________________________ ____________ ______________
____________________________ ____________ ______________
____________________________ ____________ ______________
____________________________ ____________ ______________
____________________________ ____________ ______________
____________________________ ____________ ______________
____________________________ ____________ ______________
____________________________ ____________ ______________
Southeastern
950 SE 8th St, Hialeah, FL 33010
772-287-2141 • 800-226-8221 • Fax 772-288-4560 • Website: www.seprint.com
Page 9 of 26 Revision Date: 09/28/2022 Document #: QOP 100.01
3.2.2 Storm Preparation Time Sheet
Storm: ____________________ Date: __________________________
To all Employees: Please use this timesheet to record all storm preparation time and
expense. Attach copies of receipts for expenses. Submit completed forms and receipt
copies to Accounting. Use original receipts for expense reporting. This form will be used
strictly for record keeping; you must file a separate expense report for reimbursement
for authorized expenses.
Name: _______________________ Department: ___________________
Date: __________ Activity: __________________________________
Date: __________ Activity: __________________________________
Date: __________ Activity: __________________________________
Date: __________ Activity: __________________________________
Date: __________ Activity: __________________________________
Date: __________ Activity: __________________________________
Date: __________ Activity: __________________________________
Date: __________ Activity: __________________________________
Date: __________ Activity: __________________________________
Expenses:
Date: __________ Amount: ________ Purpose: ________________
Date: __________ Amount: ________ Purpose: ________________
Date: __________ Amount: ________ Purpose: ________________
Southeastern
950 SE 8th St, Hialeah, FL 33010
772-287-2141 • 800-226-8221 • Fax 772-288-4560 • Website: www.seprint.com
Page 10 of 26 Revision Date: 09/28/2022 Document #: QOP 100.01
3.2.3 Employee Timekeeping Sheet
Page 11 of 26 Revision Date: 09/28/2022 Document #: QOP 100.01
3.3 Prepress Checklist
Primary Responsibility: Willy Riesgo
24 - 72 hrs prior to hurricane: Assigned To: Date Completed
Cover computer and miscellaneous equipment with plastic
and remove from floor where possible Willy Riesgo
Disconnect battery back-ups from wall Willy Riesgo
Place job tickets on counter/cover with plastic Willy Riesgo
Cover/disconnect proofing equipment Nelson Bacallao
Process and plate as many jobs as possible Nelson Bacallao
Cover plates with plastic Nelson Bacallao
Have at least 2 weeks raw material on hand Willy Riesgo
Cover and move legacy backups to vault Willy Riesgo
Cover all CPU’s with plastic Willy Riesgo
Confirm offsite replication is completed Willy Riesgo
Shut down server room and cover with plastic Willy Riesgo
Shutdown/disconnect plating equipment and cover with
plastic
Willy Riesgo /
Nelson Bacallao
Confirm if any services are needed during storm Willy Riesgo
3.4 Pressroom Checklist
Primary Responsibility: Don Lewis
24 - 72 hrs prior to hurricane: Assigned To: Date Completed
Cover computer and miscellaneous equipment with plastic
and remove from floor where possible Don Lewis
Disconnect battery back-ups from wall Don Lewis
Cover all stock on press room floor Don Lewis
Move everything (machinery, WIP, supplies, etc.) away
from A/C vents
Don Lewis
Cover presses with plastic Don Lewis
3.5 Bindery Checklist
Primary Responsibility: Don Lewis
24 - 72 hrs prior to hurricane: Assigned To: Date Completed
Cover computer with plastic and remove from floor where
possible
Don Lewis
Disconnect battery back-ups from wall Don Lewis
Place items on second pallet Don Lewis
Move everything (machinery, WIP, supplies, etc.) away
from A/C vents
Don Lewis
Cover equipment with plastic Don Lewis
Page 12 of 26 Revision Date: 09/28/2022 Document #: QOP 100.01
3.6 Warehouse and Shipping 950 Checklist
Primary Responsibility: Nick Mader
24 - 72 hrs prior to hurricane: Assigned To: Date Completed
Cover computer and miscellaneous equipment with plastic
and remove from floor where possible Nick Mader
Disconnect battery back-ups from wall Nick Mader
Place outside materials in warehouse Nick Mader
Put all materials possible on pallets Nick Mader
Brace and cover up roll up doors Nick Mader
Place sandbags or water absorption materials against roll up
doors
Nick Mader
Ship out as many completed jobs as possible Nick Mader
Shut down breakers Nick Mader
Charge forklifts and fill propane tanks Nick Mader
Produce computer printouts of stock status by customer,
category and location (3 total). Maintain offsite.
Nick Mader
Fuel all trucks and vans Nick Mader
Park as many vehicles as possible in warehouses Nick Mader
Take video of the interior, exterior and roof of the building Franz Fernandez
3.7 Warehouse and Shipping Axis Park Checklist
Primary Responsibility: Joseph Falcon
24 - 72 hrs prior to hurricane: Assigned To: Date Completed
Cover computer and miscellaneous equipment with plastic
and remove from floor where possible Joseph Falcon
Disconnect battery back-ups from wall Joseph Falcon
Place outside materials in warehouse Joseph Falcon
Put all materials possible on pallets Joseph Falcon
Brace and cover up roll up doors Joseph Falcon
Place sandbags or water absorption materials against roll up
doors
Joseph Falcon
Ship out as many completed jobs as possible Joseph Falcon
Shut down breakers Joseph Falcon
Charge forklifts and fill propane tanks Joseph Falcon
Produce computer printouts of stock status by customer,
category and location (3 total). Maintain offsite.
Joseph Falcon
Shutdown the equipment and cover with plastic. Joseph Falcon
Take video of the interior, exterior and roof of the building Franz Fernandez
Page 13 of 26 Revision Date: 09/28/2022 Document #: QOP 100.01
3.8 Wide Format Checklist
Primary Responsibility: Hector Ramos
24 - 72 hrs prior to hurricane: Assigned To: Date Completed
Cover computer and miscellaneous equipment with plastic
and remove from floor where possible Hector Ramos
Disconnect battery back-ups from wall Hector Ramos
Shutdown the equipment and cover with plastic Hector Ramos
Cover WIP with plastic Hector Ramos
Have at least 2 weeks raw material on hand Hector Ramos
Have all supplies possible off the floor Hector Ramos
Shut down breakers Hector Ramos
3.9 Human Resources Checklist
Primary Responsibility: Joann Villanueva
24 - 72 hrs prior to hurricane: Assigned To: Date Completed
Get hours worked from time clock Joann Villanueva
Have manual timecards on hand Joann Villanueva
Backup computer: Review documents and folders to
confirm all data is protected via computer & server backups.
Copy anything required offsite to external hard drive.
Joann Villanueva
Confirm all employee files are digitized. Joann Villanueva
Cover computer and miscellaneous equipment with plastic
and remove from floor where possible
Joann Villanueva
Obtain up to date hurricane information from Red Cross, etc
to pass out to employees
Joann Villanueva
Confirm all employee contact information has been updated
in the payroll system
Joann Villanueva
Obtain temp staffs contact information Joann Villanueva
Provide Key Staff with current Emergency contact info for
all employees and temps.
Joann Villanueva
Page 14 of 26 Revision Date: 09/28/2022 Document #: QOP 100.01
3.10 Mailing and Data Processing Checklist
Primary Responsibility: Sean Yates
24 - 72 hrs prior to hurricane: Assigned To: Date Completed
Place all material on pallets where able. Sean Yates
Cover computers and miscellaneous equipment with plastic
and remove from floor where possible Sean Yates
Disconnect battery back-ups from wall Sean Yates
Shut down breakers Nick Mader
Brace and cover up roll up doors Nick Mader
Place sandbags or water absorption materials against roll up
doors Nick Mader
Work with shipping to ship out as many completed jobs as
possible Sean Yates
*Backup Data to Storage device Alberto Comas
Download and prepare data for handoff to a backup location
if needed Alberto Comas
*Confirm proper procedures with Alberto Comas
3.11 Digital Checklist
Primary Responsibility: Vince Pilla
24 - 72 hrs prior to hurricane: Assigned To: Date Completed
Place all material on pallets where able. Vince Pilla
Cover computers and miscellaneous equipment with plastic
and remove from floor where possible Vince Pilla
Disconnect battery back-ups from wall Vince Pilla
Shut down breakers
Work with shipping to ship out as many completed jobs as
possible Vince Pilla
Cover exhaust venting on roof for digital web and digital
sheet presses Nick Mader
Brace and cover up roll up doors Nick Mader
Place sandbags or water absorption materials against roll up
doors Nick Mader
Park the clamp truck against the south roll up door Vince Pilla
Page 15 of 26 Revision Date: 09/28/2022 Document #: QOP 100.01
4 Post Disaster
4.1 General
Resources will include outside vendors, Southeastern staff and equipment and
production staff from companies out of state, or out of affected area.
The Production Team will consist of:
Franz Fernandez 786-554-6654
Richard Davy 954-451-6126
Don Lewis 772-528-8117
Willy Riesgo 954-253-1581
Nick Mader 561-309-2428
Steve O’Neil 561-866-2202
Joseph Falcon 305-972-0676
Vince Pilla 305-801-2136
Sean Yates 614-353-5619
The Client Services/Storefront/Phones Team will consist of:
Mary Jo Lynch, Client Services 954-605-7955
Steve Kupchun, Storefront 954-817-3846
Alex Vargas, Estimating 305-988-2609
The Finance Team will consist of:
Robert Cawthon 615-429-8542
Rodger Heckman 954-257-7080
Erika Fischer 954-242-9554
The IT Team will consist of:
Carl Von Werder 281-796-2110
DIT: Elving Santana 954-683-1161
DIT: Adam Steinhoff 561-491-5725
DIT: Josh Hughes 561-632-6439
DIT: James Craft 561-491-5746
The Administrative Team will consist of:
Christine Bitner 260-242-2411
Amanda Ganswindt 772-359-5428
Robert Cawthon 615-429-8542
Joann Villanueva 305-316-5522
Page 16 of 26 Revision Date: 09/28/2022 Document #: QOP 100.01
Take Photographs.
Make a complete listing of physical damage to the building and contents.
Call the insurance company and/or insurance agent to file a claim.
Make a notation as to all relevant dates (evacuation, curfews, timing of storm force
winds, passing of the storm, duration of power outage, phone outage, etc.)
Make a complete listing of all business impact issues, print jobs referred elsewhere,
print jobs shipped out, lost contracts or opportunities due to storm contingencies, etc.
As employees return to work, distribute the Work Area Inspection Report for their
completion.
Alert Accounts Payable to copy all storm-related invoices and expenses.
Alert all personnel authorized to purchase, to submit copies of purchase orders and
estimates for restoration expenses.
Prepare a draft of the insurance claim as soon as possible, particularly for physical
damage. The claim may have several components and a different adjustor for each
(preparation, physical damage, business interruption, extra expense, mold, sewage,
etc.) Be sure to clearly communicate any special insurance considerations to the areas
affected; water damage versus storm damage for example, so that the Companies’
claims are not compromised.
Returning to normal mode:
When all equipment is made operational, the Production, Client Services and
Administrative teams will coordinate with their counterparts in out of state companies,
and outside vendors, to restart at Southeastern.
Page 17 of 26 Revision Date: 09/28/2022 Document #: QOP 100.01
5 Resource Plan
5.1 Key Staff Phone List
Don Mader 772-263-1090 Christine Bitner 260-242-2411
Rob Cawthon 615-429-8542 Franz Fernandez 786-554-6654
Richard Davy 954-451-6126 Don Lewis 772-528-8117
Steve Kupchun 954-817-3846 Mary Jo Lynch 954-605-7955
Terry Gelfand 786-586-0647 Vince Pilla 305-801-2136
Amanda Ganswindt 772-359-5428 Nick Mader 561-309-2428
Joann Villanueva 305-316-5522 Sean Yates 614-353-5619
Carl Von Werder 281-796-2110 Erika Fischer 954-242-9554
Alex Vargas 305-988-2609 Willy Riesgo 954-253-1581
Hector Ramos 786-858-5553 Joseph Falcon 305-972-0676
Steve O’Neil 561-866-2202 Marco Rocha 860-970-1153
Hector Pinzon 786-328-2267
5.2 Key Staff Back-up Plan
If certain key staff is unavailable, personnel will be appointed to back them up.
Christine Bitner will be backed up by Franz Fernandez
Carl Von Werder will be backed up by Amanda Ganswindt
Amanda Ganswindt will be backed up by Joann Villanueva
Franz Fernandez will be backed up by Richard Davy
Mary Jo Lynch will be backed up by Helen Kutukyan
Nick Mader will be backed up by Terry Gelfand
Robert Cawthon will be backed up by Amanda Ganswindt
Richard Davy will be backed up by Don Lewis
Procedure:
If a key person is unable to report for work, he/she will call his/her assigned backups.
Once notified, the assigned backups will perform all critical functions needed for the key
staff person who is missing. The same procedures will be followed as if the person was
on vacation, except if phone contact is possible. It is expected that the key person stay
in touch.
Page 18 of 26 Revision Date: 09/28/2022 Document #: QOP 100.01
5.3 Alternate Production Resources
If Southeastern Printing’s facility requires production support to maintain operations,
Southeastern Printing will work with its approved Peer Network of print manufactures to
temporarily transition the workload to the plant(s) best suited and able to handle the
work. Reference the Peer Network Contract List for individual contact details.
In the event we need to utilize Off-Site Operations, Executive staff will coordinate
contacting the key contacts in the Peer Network to enlist their services, identify their
capacity and obtain their internal points of contact for us to communicate with on a daily
or as needed basis.
Additional organizations may be considered if needed provided the following items are
attended to prior to awarding the work:
• A non-compete agreement is signed
• Vendor submits samples that are evaluated and meet Southeastern Printing
quality standards
• Vendor can meet delivery requirements
• Vendor is FSC certification, if required
As Southeastern returns to operational mode, subcontracting of work will be reduced
accordingly until all operations are once again completed in house.
5.4 Approved Peer Network Locations
Baseman
4477 Reynolds Dr
Hillard, OH 43026
www.baseman.com
1Vision
5105 E 41st St
Denver CO, 802106
2125 TV Rd
Jackson, MS 39204
1055 Conrad Sauer Dr
Houston, TX 77043
www.1-vision.com
Prisma Graphics
2937 E Boardway Rd
Phoenix, AZ 85040
www.poweredbyprisma.com
Midstates
4820 Capitol Ave NE
Aberdeen, SD 57401
www.midstatesgroup.com
Reference the Peer Network Contact List available on the Document Vault for a detailed
list of contacts and contact information.
Page 19 of 26 Revision Date: 09/28/2022 Document #: QOP 100.01
5.5 Coastal Printing
1730 Independence Blvd
Sarasota FL 34234
941.351.1515
www.coastalprint.com
Coastal Printing will assist in the production of all necessary requirements related to
FPL. Reference the FPL Supplement to this Disaster Recovery Manual for details.
Coastal Printing will be granted access to our storefront orders via email notifications,
Four51 password and hard drive back-up of storm maps during pre-hurricane
preparations.
Jim Schoff
Prepress Manager
Cell: 941.539.4288
Phone: 941.351.1515
Email: creo1@coastalprint.com
Gail Knight
Prepress – proof assembly / QC
Cell: 941.330.5921
Phone: 941.351.1515
Email: gail@coastalprint.com
Brian McDonald
Controller
Cell: 941-725-9990
Direct: 941-359-2414
Email: brian.m@coastalprint.com
Howie Leibowitz
General Manager
Office 941-351-1515
Cell 727-494-2327
howie@coastalprint.com
5.6 Phone System Down
Objective:
To continue operating and servicing customers if the phone system is inoperable.
Procedure:
Test the phone system. If the facility phone system is down, the Customer Service
Team will coordinate operating measures via cell phone.
Operating:
Sales staff and Customer Service team will contact customers that currently have work
in house, to inform them of the phone outage, and reassure them regarding their jobs. If
phone service will be interrupted for a long period of time, it may be necessary for sales
staff to contact all customers and inform them of the outage.
Resource Plan:
Every available cell phone will be utilized. Normal operations will be resumed when
phone lines are repaired.
Page 20 of 26 Revision Date: 09/28/2022 Document #: QOP 100.01
5.7 Core Computer System Down
Objective:
To continue operating, servicing customers, and maintaining integrity of records if core
computer system is inoperable.
Procedure:
Upon testing after hurricane, or anytime thereafter, the core computer systems are
deemed inoperable.
Each of the following will have full authority in their assigned areas:
Production-related contingency measures will be coordinated by:
Customer service-related contingency measures will be coordinated by:
Administrative-related contingency measures will be coordinated by:
Operating:
Production team will be responsible for coordinating the scheduling of equipment and
maintaining all production records. They will begin to work off preprinted schedules,
utilize “pen orders by customer” lists, that were printed out before the hurricane. Using a
magnetic scheduling board, they will place each job. An additional schedule will be kept
on Excel, that will be printed daily and given to customer service. All previously entered
orders will be on the preprinted schedule. All new orders will be handwritten, copied and
scheduled if they are to be run prior to computer coming back up. Copies will be made
of handwritten orders and job tickets made. Each new order brought in will be reviewed
by the scheduling staff. They are listed below: (To be completed when hurricane watch
is issued)
Richard Davy Willy Riesgo
Carl von Werder MaryJo Lynch
They will determine who needs copies of the orders (graphics, prepress, pressroom,
bindery) and they will distribute. All orders and production records will continue to be
manually kept and entered into the system when available.
The Client Services team will handle customer service requirements. They will meet
daily with the scheduling staff to discuss status of orders and customer requirements.
The Administrative team will assure proper accounting/billing records are kept, for jobs
produced while computer is down.
Receiving- Detailed daily receiving logs will be kept in the receiving department and
organized for ease of entry once system is available.
Shipping – Manual bills of lading will be utilized.
Page 21 of 26 Revision Date: 09/28/2022 Document #: QOP 100.01
Accounts Payable – Invoices will be sorted and matched with manual receivers and
coded for ease of entry once system is available. Emergency checks will be manually
prepared and signed if need be.
Cash Posting – All will be held in daily batches awaiting system availability.
Accounts Receivable – Staff will concentrate on catching up cash posting once system
is available. Billing will be completely prepared for entry and batched by day.
Estimating – Will be done manually, using preprinted machine hourly rates and costs.
Purchasing – Will utilize manual purchase order system and sort for entry into the
Monarch system when available.
Page 22 of 26 Revision Date: 09/28/2022 Document #: QOP 100.01
5.8 Delivery of Materials
Objective:
Continue normal production without interruption caused by lack of timely delivery of raw
materials.
Each of the following will have full authority in their assigned areas.
The following will be responsible for finding and arranging alternate sources of carrier
services, if one or more carriers normally used, becomes unable to deliver product.
This includes ensuring that there is at least a two-week supply of all raw materials on
hand, during the hurricane season.
(To be completed when hurricane watch is issued)
1. Nick Mader
2. Carl von Werder
3. Willy Riesgo
4. Terry Gelfand
5. Joseph Falcon
6. Ubaldo Perez
7. Erika Fischer
Procedures:
Team listed above will check on and monitor status of deliveries of all critical materials
when the first sign of threat due to hurricane occurs. If there is a problem with depletion
of materials, it will be identified and resolved before the first hurricane watch is
announced.
The following materials may be involved:
1. Paper
2. Ink
3. Boxes, shipping supplies
4. Plates, and related chemicals
Resource plan:
In-house staff resources should be sufficient to operate.
Page 23 of 26 Revision Date: 09/28/2022 Document #: QOP 100.01
5.9 Outbound Carriers
Objective:
Continue delivery of finished goods to customers when one or more delivery service or
carriers are not operating.
If there are problems having product delivered by one or more carriers, each of the
following will be responsible for finding and arranging alternate sources of freight carrier
service, if one or more carriers previously used, is unable to pick up and deliver finished
goods.(To be completed when hurricane watch is issued)
1. Nick Mader
2. Terry Gelfand
3. Joseph Falcon
4. Steve Kupchun
Procedures:
Southeastern currently uses __1__ outbound carriers and __1__ local delivery services.
In-house trucks will be used to capacity. Trucks owned by numerous staff members
could also be used for certain smaller deliveries.
In-house resources should be sufficient to operate using overtime if necessary, and will
be coordinated by the above staff.
When delivery capabilities by the usual carriers and delivery services have been
restored, deliveries will be switched back to normal carriers.
5.10 Time Clock
Objective:
To continue tracking employee’s hourly time for payroll purposes. Time will be kept
manually.
FTE’s & TEMP Staffing
Upon testing after hurricane, the time clock system is deemed inoperable
Each of the following will have full authority in their assigned areas:
Manual timecards will be tracked and approved by:
(To be completed when hurricane watch is issued)
1. Amanda Ganswindt/Joann Villanueva- Plant
2. Don Lewis - Press
3. Don Lewis - Bindery
4. Don Lewis- Handwork, Mailing
5. Franz Fernandez- Wide Format, Digital, Prepress
6. Nick Mader- Shipping, Receiving, Warehouse
7. Steve O’Neil- Axis Warehouse
8. Robert Cawthon- Accounting
Page 24 of 26 Revision Date: 09/28/2022 Document #: QOP 100.01
HR Manager, will coordinate payroll-related contingency measures.
She will have manual time cards on hand when hurricane watch is announced.
Procedures:
Employee hours will be entered and tracked on manual timecards. One card will be
available for each hourly employee. Cards will be distributed to appropriate supervisors,
who will be responsible for keeping track of hourly employee’s time, within their
respective departments. Employee will enter start and stop times and supervisor will
initial.
Resources will include the existing production supervisors and HR department.
Production Team:
1. Don Lewis
2. Richard Davy
3. Willy Riesgo
4. Nick Mader
5. Steve O’Neal
HR Team:
1. Joann Villanueva
2. Amanda Ganswindt
When the time clock becomes functional, there will be a return to normal operating
mode.
6 Client Communication and Data Protection
In the event of a disaster that causes a business disruption, clients will be contacted
directly by their Southeastern representative to discuss details of the recovery plan.
Should a major interruption take place, updates will be provided via written
communication and through the Southeastern website. www.seprint.com.
All client data is backed up to an offsite location for loss prevention and ease of
recovery.
Page 25 of 26 Revision Date: 09/28/2022 Document #: QOP 100.01
7 Important Contact Information
7.1 FPL
For restoration progress after a storm: FPL.com
To report or track and outage: Call 800-4-OUTGAGE (800-468-8243) or visit
www.FPL.com/outage
Customer Advisor
Frank Strizekla
Frank.Strizekla@fpl.com
305-608-7851
7.2 Local Hospitals
Jackson Memorial
1611 NW 12th Ave, Miami, FL 33136
305-585-1111
Hialeah Hospital
651 E 25th St, Hialeah, FL 33013
305-693-6100
Jackson West Medical Center, Doral
2801 NW 79th Ave, Doral, FL 33122
786-466-1000
University of Miami Hospital
1400 NW 12th Ave, Miami, FL 33136
305-325-5511
7.3 Small Business Administration
800-359-2227
7.4 FEMA
800-462-9029
7.5 Insurance Agent
Brown and Brown of Florida, Inc
Ellior Schtekher
954-776-222
Page 26 of 26 Revision Date: 09/28/2022 Document #: QOP 100.01
8 Revision History
Reason for Revision Approved By Approval
Date
Created Miami version based on Stuart plan. C. von Werder 09/05/2017
Updated IT shutdown procedure and responsible parties C. von Werder 06/05/2018
Updated all areas of document. J. Medina 08/01/2018
Updated Document number and added supplements to list of supporting documents.
Changed title from Hurricane Emergency Preparedness Guide to Hurricane and
Disaster Preparation Guide and Recovery Plan.
A. Ganswindt 07/17/2019
Updated responsibilities throughout Manual A. Ganswindt 08/29/2019
Updated responsibilities throughout Manual F. Fernandez 07/02/2021
Updated responsibilities throughout Manual. Added Axis Park. A. Ganswindt 07/01/2022
Added Client Communication and Data Protection section. A. Ganswindt 07/15/2022
Updated responsibilities, reformatted throughout. Updated address on front cover to
include Axis Park. Added printing of department schedules.
A. Ganswindt 09/28/2022