Loading...
HomeMy WebLinkAboutReso 2014-2264RESOLUTION NO. 2014- �! A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, APPROVING AN AGREEMENT WITH SAFEWARE, INC. TO INSTALL AND MAINTAIN PHASE I OF A CITYWIDE SECURITY CLOSED CIRCUIT TELEVISION (CCTV) SYSTEM, IN AN AMOUNT NOT TO EXCEED ONE MILLION TWO HUNDRED THIRTY - SEVEN THOUSAND SEVEN HUNDRED FIFTY -FIVE DOLLARS AND EIGHTY CENTS (51,237,755.80), IN SUBSTANTIALLY THE SAME FORM ATTACHED HERETO AS EXHIBIT "A'; AUTHORIZING THE MAYOR TO EXECUTE SAID AGREEMENT; AUTHORIZING THE CITY MANAGER AND THE CITY ATTORNEY TO DO ALL THINGS NECESSARY TO EFFECTUATE THIS RESOLUTION; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the installation of a Cit }wide Security Closed Circuit Television (CCTV) System would provide the Police Department with 24- hour /7 -days a week surveillance of the City's ten (10) Parks and locations throughout the Cite, in addition to the invaluable archival data of up to thirty (30) days for investigative purposes; and NVHEREAS, the Police Department and the Information Technology Department have worked closely with a Cite contracted security consultant to design an optimal security layout plan for each location: and WHEREAS, Safeware; Inc. has provided a proposal for these services in an amount of S 1,032,391.49, plus Project Permit Fees S 17.800.00, Bonding Fees $26;117.90; vendor contingency S79.835.00. and the Cite has added an additional contingency amount of S81.611.41 (15 %) for any unforeseen additions not listed in the proposed scope of work. in a total amount of S1.237.755.80; and WHEREAS, Safeware, Inc. is qualified, willing and able to provide the desired services; and WHEREAS, the City Commission wishes to approve an Agreement with Safeware. Inc.. for installation and maintenance of Phase I of a Citywide Security Closed Circuit Television (CCTV) System, in an amount not to exceed One Million Two Hundred Thirty -Seven Thousand Seven Hundred Fifty -Five Dollars and Eighty Cents (S1,237.755.80). in substantially the same form attached hereto as Exhibit "A ". through the US Communities Government Contract titled: "Homeland Security & Public Safety/Emergenev Preparedness" Contract 94400001839. with funding through the DOJ Federal Forfeiture Fund. NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, AS FOLLOWS: Section 1. Approval of Agreement. The City Commission hereby approves the Agreement with R?014- Safe,are Agmt for Phase I Cinwde Security CCTV System Page 1 of 2 Safeware. Inc.. for installation and maintenance of Phase I of a Citywide Security Closed Circuit Television (CCTV) System, in an amount not to exceed One Million Two Hundred Thirty -Seven Thousand Seven Hundred Fifty -Five Dollars and Eighty Cents (S 1,237,755.80). in substantially the same form attached hereto as Exhibit "A ", with funding through the DOJ Federal Forfeiture Fund. Section 2. Authorization of Mavor. The Mavor is hereby authorized to execute said Agreement. Section J. Authorization of Citv Manager and Cite Attomev. The Citv Manager and the City Attomev are hereby authorized to do all things necessary to effectuate this Resolution. Section 4. Effective Date. This Resolution will become effective upon adoption. PASSED AND ADOPTED this 17' day of July 2014. , "ATTEST:. 1 p Jane A! Hines. MMC, City Clerk APPROVP AS TO FORM AND L AL SUFFICIENCY: Attorney Vote: S� Mayor Edelcup ✓(Yes) Vice Mayor Aelion ✓ (Yes) Commissioner Gatto ✓ (Yes) Commissioner Levin V (Yes) Commissioner Scholl (Yes) Moved by: 20 Ywry�,thy:,Ovan �\A0 LL Seconded bv: To (No) —(N' o) (NO) _(No) _(No) 82011- Safmare Aemt for Phase I Cinu'ide Securin, CCTV System Nee 2 of 2 y�Ht+♦ i „f p :o.. AGREEMENT BETWEEN THE CITY OF SUNNY ISLES BEACH AND SAFEWARE, INC. CONTRACT NO. C1314 -066 THIS AGREEMENT (hereinafter referred to as the "Agreement ") is made in duplicate. this _k�r—day of July, 2014 by and between the CITY OF SUNNY ISLES BEACH, (hereinafter referred to as "Cite "), and SAFEWARE, INC.. a Corporation authorized to do business in the State of Florida (hereinafter referred to as "Contractor ") whose Federal I.D. 4 is S2• I1SZH$ RECITALS WHEREAS, City is in need of Contractor to provide a multiple zone security solution with an expandable high bandwidth video surveillance system, for Public Safety and Emergency Preparedness and Related Services at ten (10) parks and various locations throughout the City: and WHEREAS, Contractor has expressed the ability and desire to provide these Services pursuant to the pricing terms and conditions offered to the County of Fairfax, Virginia, Contract No. RQ1 1-205753-10A. as more fully described in the Contractor's Proposal, a copy of which is attached hereto as Attachment "A ". and incorporated herein by reference: and WHEREAS, pursuant to the City's procurement code provisions, purchases made under state. county or other governmental contracts, or competitive bids with other governmental agencies are exempt from the City's competitive bidding procedures: and WHEREAS. the City desires to enter into this Agreement with Contractor to provide the Services in a total amount not to exceed One \9illion Two Hundred Thirty Seven Thousand Seven Hundred Fifty Five Dollars and Eighty Cents (51.237.755.80). NOW THEREFORE, in consideration of the mutual covenants contained herein_. and for other valuable consideration received. the receipt and sufficiency of which are hereby acknowledged, the parties agree as follows: ARTICLE 1. DEFINITIONS Agreement means this Agreement together with the Contract Documents. Bond(s) means the Payment Bond and the Performance Bond issued by a surety or sureties in accordance with the provisions of the Contract Documents. Commencement Date means the date specified in the Notice to Proceed from the City Manager or his designee. Contract Amount means the total sum of monies which has been agreed to between the Contractor and the City as the total price for the supply and installation of the Project and the performance of Contract Documents means this Agreement, the pricing terms and conditions per County of Fairfax, Virginia, Contract No. RQ11- 205753 -10A, any Addenda. Supplemental Terms and Conditions. the Contractor's Proposal to the City attached hereto as Attachment "A ", the Payment and Performance Bond, any approved written interpretations and clarifications. Field Directives, Construction Change Directives. any Change Orders issued thereto, and any modifications, duly issued after execution of the Agreement. Contract Time means the time period defined in this Agreement for the Contractor to complete the Services. Contractor means Safeware. Inc.; the contractor selected by the City to provide all labor, materials; equipment and services to complete the Services described in the Contract Documents. Contractor Project Manager means the person designated by Contractor as its lead representative to the City. The Contractor Project Manager shall have the authority to obligate and bind the Contractor and to act on all matters on behalf of Contractor except for revisions to the Contract Documents and Change Orders. Construction Change Directive means a written directive to effect changes to the Services. prepared by and executed by the City. Construction Work means all work required by this Agreement for the completion of Services. Cure means the action taken by the Contractor, promptly after receipt of written notice from the City of a breach of the Agreement. which shall be performed at no cost to the City, to repair, replace, correct. and /or remedy all material, equipment, or other elements of the Services or the Agreement affected by such breach, or to otherwise make good and eliminate such breach, including. without limitation, repairing, replacing or correcting any portion of the Services or the Project site disturbed in performing such cure. Cure Period means a period of seven (7) days, after receipt of written notice to cure from the City, in which the Contractor is required to cure deficiencies in the Services or compliance with this Agreement or the Contract Documents. Drawings means the graphic and pictorial portions of the Services, .which sere to show the design. location and dimensions of the .work to be performed. including. without limitation, all notes. schedules and legends on such Drawings. Field Directive means a written approval for the Contractor to proceed with work requested by the City. which is minor in nature and should not involve additional cost. Insurance Requirements means the requirements described in this Agreement and the Contract Documents. Notice To Proceed means a written letter or directive issued by the City Manager or his designee directing that the Contractor may begin Services on the Project or a specific task of the Project. 2 V Project i\Ianager means an employee or representative of the City assigned to manage and monitor the Services to be performed under this Agreement and the construction of the Project. Project means the complete supply and installation. including incidentals thereto, to provide a multiple zone security solution with an expandable high bandwith video surveillance system for public safety and emergency preparedness and related services at ten (10) parks and various locations throughout the City, as more fully described in the Contract Documents. Request For Information (RFI) means a request from the Contractor seeking an interpretation or clarification by the Citv relative to the Agreement and/or the Contract Documents. The RFI. which shall be clearly marked RFI; shall clearly and concisely set forth the issue(s) or item(s) requiring clarification or interpretation and why the response is needed. The RF1 must set forth the Contractor's interpretation or understanding of the document(s) in question. along with the reason for such understanding. Specifications and Plans as used herein means that portion of the Contract Documents which are the written requirements for the materials, equipment, systems, standards and workmanship for completion of the Services and performance of related services for this Project. Sub- Contractor(s) means a person or entity other than a materialman or laborer that has a direct contract with the Contractor to perform or supply any portion of the Services in connection with this Project. Time for Completion means the time to complete all Services no later than Ninety (90) days from the Commencement Date specified in the Notice to Proceed issued by the City Manager or his designee. Final Completion means the date certified by the City Manager or his designee that all documents required by the Contract Documents have been received by the City Manager or his designee: anv other documents required to be provided by Contractor have been received by City Manager or his designee: and to the best of Citv Manager or their designee's knowledge. information and belief the Services defined herein has been fully completed in accordance with the terms and conditions of the Contract Documents. Services as used herein refers to all services required by the Contract Documents, including all labor, materials, equipment, supervision and services needed to complete the Project in accordance with the Contract Documents. ARTICLE 1. SCOPE OF WORK Contractor shall provide all labor. materials, equipment, tools, manpower. management. supervision, and all other necessary goods and services to perform the Work in the manner provided by this Agreement and the Contract Documents. ARTICLE 2. CONTRACT TIME, TIME FOR COMPLETION AND LIQUIDATED 1 1' 3 1 ) DAMAGES 2.1 Time is of the essence in the performance of the Services under this Agreement. The Commencement Date shall be the date specified in the Notice to Proceed issued by the City Manager or his designee. Contractor shall perform the Services in accordance with the Contract Documents and shall achieve Final Completion of the Services no later than Ninety (90) days from the Commencement Date specified in the Notice to Proceed issued by the City Manager or his designee. The Notice to Proceed will be issued after the Contractor has obtained the necessary Permits to complete the Project. Contractor shall be required to apply for the necessary_ Permits to complete the Project no later than Ten (10) days after execution of this Agreement. 2.2 Contractor shall submit all required documents. including but not limited to the Bonds and the Insurance Certificate, prior to issuance of Notice to Proceed by the City Manager or his designee. In the event Contractor fails to deliver to the City Manager or his designee the required documents within ten (10) days after execution of this Agreement, or fails to apply for the Permits within ten (10) days after execution of this Agreement. or fails to commence Services by the date specified in the Notice to Proceed issued by the City Manager or his designee. then Contractor shall be in default. In such event the City; in addition to all remedies provided for an event of Contractor's default hereunder, shall have the right to collect from Contractor all expenses incurred by the City in the re- procurement of the Services. 2.3 Time is of the essence throughout this Agreement. 2.4 Upon failure of Contractor to complete the Services within the deadline stated in the Contractor's "Project Timeline ", attached hereto as Attachment "A no later than Ninety (90) days from the Commencement Date specified in the Notice to Proceed, plus any approved time extensions (if applicable), Contractor shall pay to the City the sum of Four Hundred Dollars (5400.00) for each calendar day date beyond this deadline for completion. These amounts are not penalties but are liquidated damages to the City for its inability to obtain beneficial occupancy and /or use of the Project. Liquidated damages are hereby fixed and agreed upon between the parties, recognizing the impossibility of precisely ascertaining the amount of damages that will be sustained by the City as a consequence of such delay, and both parties desiring to obviate any question of dispute concerning the amount of said damages and the cost and effect of the failure of Contractor to complete the Services on time. 2.5 The City is authorized to deduct liquidated damages from monies due to Contractor for Services under this Agreement or as much thereof as the City may, in its sole discretion, deem just and reasonable. 2.6 Contractor will promptly perform its duties under the Contract Documents and will give the Services as much priority as is necessary to cause the Services to be completed on a timely basis in accordance with the Contract Documents. Time is of the essence of this Agreement. All Services shall be performed strictly (not substantially) within the time limitations necessary to meet all deadlines established in the Contract Documents. 2.7 All dates and periods of time set forth in the Contract Documents, including those for the 4S l� commencement and completion of the Services; and for the delivery and installation of materials and equipment, were included because of their importance to the City. 2.8 Contractor acknowledges and recognizes that the Citv is entitled to full and beneficial use of the Project following expiration of the Time for Completion. 2.9 Contractor agrees to the assessment of liquidated damages as provided in this Agreement 2.10 Except for extensions approved in writing by the City, Excusable Delays; or as otherwise specifically provided in this Agreement, the Contractor understands that the occurrence of events of delay within the Contractor's reasonable control shall not excuse the Contractor from its obligation to achieve Final Completion of the Services within the time stipulated in this Agreement. and shall not entitle the Contractor to an adjustment of the Contract Amount. All parties under the control or contract with the Contractor shall include_. but are not limited to. subcontractors, materialmen and/or laborers. ARTICLE 3. EXCUSABLE DELAY The Time for Completion may be extended by reason of an Excusable Delay. An Excusable Delay is delay caused by circumstances (i) beyond the reasonable control of Contractor. its Sub - Contractors. suppliers and vendors and (ii) not caused by the negligence of Contractor. its Sub - Contractors, suppliers and vendors. Where Contractor claims that it is entitled to an extension because of an excusable delay. it shall furnish to the Project Manager all documentation supporting its claim. including, details of the claim. a description of the work affected and the actual costs resultine from the delay. Failure of Contractor to comply with this Article as to any particular event of delay shall be deemed conclusively to constitute a waiver, abandonment or relinquishment of any and all claims resulting from that particular event of delay. ARTICLE 4. NO DAMAGE FOR DELAY In the event completion of the Project is delayed through no fault of Contractor or City, it is agreed that Contractor's sole and exclusive remedy is a time extension of the Time for Completion equal to each day the work is so delayed. The Cite shall not be liable for any delay damages or damages in any Nvay attributable to perforating work out of sequence, acceleration claims; or other similar type claims, incurred by Contractor or any of its Sub - contractors, arising out of or in any way associated with the performance of this Contract. ARTICLE 5. CONTRACT ANIOUNT, PROGRESS PAYMENTS AND FINAL PAYI7ENT 5.1 The City shall pay to the Contractor, for the faithful performance of all work in connection with this Project the total amount not to exceed One tMillion Two Hundred Thirty Seven Thousand Seven Hundred Fifty Five Dollars and Eighty Cents (51,237,755.80) for all Services performed under this Agreement. Payment shall be made pursuant to approved applications as stated in the Contractor's "Payment Schedule ", attached hereto as Attachment "A ". Payment shall be made within thirty (30) days after the City's receipt of Contractor's Application for Payment, approved by the City, and accompanied by sufficient supporting documentation. and containing sufficient detail, to allow a proper audit of all expenditures { D iii incurred by Contractor, should the Cite require one to be performed. 5.2 There are no reimbursable expenses associated with this Agreement. The total not to exceed amount specified in Section 5.1. above specifically includes the following maximum allowances: (i) Project permit fees not to exceed Seventeen Thousand Eight Hundred Dollars (517.800.00). (ii) performance and payment bonding fees at 2.5% of the total contract price in an not to exceed Twenty Six Thousand One Hundred Seventeen Dollars and Ninety Cents (S26,117.90), (iii) Project labor and material contingency fees not to exceed Seventy Nine Thousand Eight Hundred Thirty Five Dollars (579.835.00): and (iv) Eighty One Thousand Six Hundred Eleven Dollars and Forty One Cents (581,611.41). 5.3 Contractor may make Application for Payment for Services completed during the Project at intervals of not more than once a month. Contractor's Application for Payment shall include partial release(s) of liens or consent of Surety relative to the portion of the Services, which is the subject of the Application for Payment and any other information required by the City. Each Application for Payment shall be submitted in triplicate to the City for approval. 5.4 Ten percent (10 %) of all monies earned by Contractor shall be retained by the City up to Ninety (90) days after Final Completion, receipt of closeout documents, and acceptance by the Citv. Any reduction in retainage shall be in accordance with Section 255.078 Florida Statutes. Any interest earned on retainage shall accrue to the benefit of the City. All requests for retainage reduction shall be in writing in a separate stand alone document. 5.5 The City may withhold, in whole or in part, payment to such extent as may be necessary to protect itself from loss on account of: 5.5.1 Defective Work not remedied by Contractor. 5.5.2 Claims filed or reasonable evidence indicating probable filing of claims by other parties against Contractor or the City because of Contractor's performance. 5.5.3 Failure of Contractor to make payments properly to Sub - Contractors or for material or labor. 5.5.4 Liquidated damages and costs incurred by the City_ for extended Project administration. 5.5.5 Failure of Contractor to comply with any other provision(s) of this Agreement. 5.6 Upon receipt of written notice from Contractor that the Project is ready for final inspection and acceptance, the City will make an inspection thereof. The City shall have up to the maximum ninety (90) day period specified in Section 5.4 above to hold the 10% retainage. I£ after the completion of this retainage period, the City finds the Services acceptable, and the requirements of the Contract Documents fully satisfied, a Final Certificate for Payment will be issued by the City, releasing the 10% retainage to the Contractor. 5.7 Before issuance of the Final Certificate for Payment. Contractor shall deliver to the City a complete release of all liens arising out of this Agreement, or receipts in full in lieu thereof. an affidavit certifying that all suppliers and Sub - Contractors have been paid in full and that all other indebtedness connected with the Project has been paid, and a consent of the surety to final r; 6 payment. and the final bill of materials, if required; and Application for Payment. Contractor shall deliver the written Contractor's and all Manufacturers' warranties prior to issuance of the Final Certificate for Payment. 5.8 If. after the Services have been substantially completed, full completion thereof is materially delayed through no fault of Contractor, and the City so certifies same. the City will, and without terminating the Agreement, make payment of the balance due for that portion of the Services fully completed and accepted. Such payment shall be made under the terms and conditions govering final payment, except that it shall not constitute a waiver of claims. 5.9 Final payment shall be made only after the City has reviewed and approved the Final Application for Payment. The acceptance of final payment shall constitute a waiver of all claims by Contractor, except those previously made in strict accordance with the provisions of the Agreement and identified by Contractor as unsettled at the time of the application for final payment. ARTICLE 6. REQUESTS FOR INFORDIATION (RFI) The Contractor shall submit in writing a Request for Information (RFI) to the City where the Contractor believes that the specifications or drawings are unclear or conflict. All requests must be submitted in a manner that clearly identifies the drawing and/or specification section where clarification or interpretation is being requested. ARTICLE 7. FIELD DIRECTIVES The City may at times issue Field Directives to the Contractor based on visits to the Project site(s). Such Field Directives shall be issued in writing and the Contractor shall be required to comply with such directive. Where the Contractor believes that the directive is outside the scope of the Project, the Contractor shall, within Forty Eight (48) hours, notify the City that the Field Directive is outside the scope of the Project. At that time the Field Directive may be rescinded or the Contractor may be required to submit a request for a Change Order proposal. Where the Contractor is notified of the position that the Field Directive is within the scope of Services and the Contractor disagrees. the Contractor shall notify the City that the Contractor reserves the right to make a claim for the time and monies based on the Field Directive. At no time shall the Contractor refuse to comply with the Field Directive. Failure to comply with the directive may result in a determination that the Contractor is in default of the Agreement. ARTICLE 8. CHANGE ORDERS 8.1 Changes in the quantity or character of the Services for the Project which are not properly the subject of Field Directives shall be authorized only by Change Orders approved in advance and issued in accordance with the guidelines of the City. 8.2 All chanties to the Services must be pre - approved in writing, in advance, by the City in accordance with the value of the Change Order or the calculated value of the time extension. In the 7 event Contractor fails to follow this procedure and performs additional work in connection with the Services without first obtaining pre - approval in writing by the City. the Contractor shall not be entitled to any additional monies in connection with the additional work performed. 8.3 In the event satisfactory adjustment cannot be reached for any item requiring a change in the Contract Amount. the Citv reserves the right at its sole option to either terminate the Agreement as it applies to the items in question and make such arrangements as may be deemed necessary to complete the disputed work; or may submit the matter in dispute as set forth in the dispute resolution procedures set forth in this Agreement. 8.4 On approval of any change increasing the Contract amount. Contractor shall ensure that the Bonds are increased accordingly. ARTICLE 9. SCOPE OF SERVICES MODIFICATION PROCEDURES 9.1 CITY INITIATED MODIFICATIONS The City will issue a detailed description of proposed changes in the Services that may require an adjustment(s) to the Contract Amount or Contract Time. If necessary. the description will include supplemental or revised drawings and specifications. Subsequent to notification of modifications in the Services by City. Contractor shall submit a quotation estimating cost adjustments to the Contract Amount and/or the Contract Time necessary to execute the chance. Contractor shall include the following information when responding: • Include a list of quantities of products required or eliminated and unit costs. with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities. • Indicate applicable taxes, delivery charges, equipment rental. and amounts of trade discounts. • Include costs of labor and supervision directly attributable to the change. • Include an updated contractor's completion schedule that indicates the effect of the chance, includinc but not limited to. changes in activity duration. start and finish times. and activity relationship. Use available total float. if an_v, before requesting an extension of the Contract Time. 9.2 CONTRACTOR INITIATED MODIFICATIONS If latent or unforeseen conditions require modifications in the contract. the Contractor may propose changes by submitting a request for a change order to the City. Contractor shall use the change order request form approved by the City Manager or his designee for said modification requests. The following MUST be submitted/included by Contractor prior to any additional work being undertaken by Contractor; failing which. the Contractor shall not be paid for the additional work: • A statement outlining reasons for the change and the effect of the change on the Services. Provide a complete description of the proposed change. Indicate the effect of the proposed change on the Contract Amount and the Contract Time. • A list of quantities of products required or eliminated and unit costs. with total amount of J1✓ purchases and credits to be made. If requested; furnish survey data to substantiate quantities. • Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts. • Cost of labor and supervision directly attributable to the change. • Comply with any applicable product requirements if the proposed change requires substitution of one product or system for product or system specified. 9.3 ALLOWANCES Allowance Adjustment. To adjust allowance amounts. Contractor shall base each Change Order proposal on the difference between purchase amount and the allowance. multiplied by final measurement of work -in- place. If applicable. Contractor shall also include reasonable allowances for cutting losses, tolerances, normal product imperfections, and similar margins. Contractor also agrees to the following conditions: • Include installation costs in purchase amount only where indicates as part of the allowance. • If requested, prepare explanation and documentation to substantiate distribution of overhead costs and other margins claimed. • Submit substantiation of a change in scope of work, if any, claimed in change orders related to unit -cost allowances. • The City reserves the right to establish the quantity of work -in -place by independent quantitv survev, measure. or count. Contractor must submit claims for increased costs because of a change in scope or nature of the allowance described in the Contract Documents. whether for the purchase order amount or contractor's handling. labor. installation, overhead, and profit. Contractor shall submit claims within fourteen (14) days of receipt of the change order or change directive authorizing work to proceed. The City shall reject claims submitted later than fourteen (14) days after such authorization. Contractor also agrees to the following conditions: • Do not include Contractor's or subcontractor's indirect expense in the change order cost unless it is clearly shown that the nature or extent of work has changed from what could have been foreseen from information in the Contract Documents. • No change to Contractor's indirect expense is permitted for selection of higher or lower priced materials or systems of the same scope and nature as originally indicated. 9.4 CHANGE ORDER PROCEDURES On the City's approval of a proposal request. the City Manager or his designee will issue a change order for signatures of the City and the Contractor on a form approved by the City. 9.5 CONSTRUCTION CHANGE DIRECTIVE Construction Change Directive. The City may issue a construction change directive on a form approved by the City. Construction change directive instructs Contractor to proceed with a change 9 I !, u in the Services. for subsequent inclusion in a change order. Construction change directive contains a complete description of change in the Services. It also designates method to be followed to determine change in the Contract Amount or the Contract Time. Documentation. Contractor agrees to maintain detailed records on a time and material basis of work required by the construction change directive. After completion of change directive. Contractor shall submit an itemized account and supporting data necessary to substantiate cost and time adjustments to the contract. ARTICLE 10. WARRANTY OF CONSTRUCTION The Contractor shall warrant that all Services performed in connection with the Project conform to the Agreement and are free of any patent and/or latent defect of the workmanship for a minimum period of one year from the date of Final Completion. This warranty shall be in addition to whatever rights the City may have under applicable law. The Contractor's obligation under this warranty provision shall be at its own cost and expense, to promptly repair or replace (including cost of removal and installation), that item (or part or component thereof) which proves defective or fails to comply with the Agreement within the warranty period such that it complies with the Agreement. ARTICLE 11. CLEANING UP —THE CITY'S RIGHT TO CLEAN UP Contractor shall at all times keep the Project areas free from accumulation of waste materials or rubbish. At the completion of the Project. Contractor shall remove all its waste materials and rubbish from and about the Project areas. as well as Contractor's tools. construction equipment; machinery and surplus materials. If Contractor fails to clean up during the execution of the Services or at the completion of the Project, the City may do so and the cost thereof shall be charged to Contractor. Cleaning operations should be controlled to limit dust and other particles adhering to existing surfaces. ARTICLE 12. REMOVAL OF EQUIPMENT In case of termination of this Agreement before completion for any cause whatsoever. Contractor, if notified to do so by the City, shall promptly remove any part or all of Contractor's equipment and supplies from the property of the City. If the Contractor fails to comply with the City's order, the City shall have the right to remove such equipment and supplies at the expense of Contractor. All existing cameras and /or equipment removed by Contractor or this subcontractor(s) shall remain the property of the City of Sunny Isles Beach. ARTICLE 13. SITE INVESTIGATION AND REPRESENTATION 13.1 The Contractor acknowledges that it has satisfied itself as to the nature and location of the Services. the general and local conditions, particularly those bearing upon availability of transportation, disposal. handling and storage of materials. availability of labor. water. electric power, and roads, the conformation and conditions at the ground and all other matters which can 10 1 J in any way affect the performance of Services or the Contract Amount. 13.2 The Contractor further acknowledges that it has satisfied itself as to the character. quality, and quantity of surface and subsurface materials to be encountered from evaluating information included in the Contract Documents. Any failure by the Contractor to acquaint itself with all the provided information will not relieve Contractor from responsibility for properly estimating the difficulty or cost thereof under the Contract Documents. ARTICLE 14. OWNERSHIP AND USE OF DOCUMENTS The Drawings, Specifications and other documents prepared by the City and copies thereof fumished to the Contractor, are for use solely with respect to this Agreement. They are not to be used by the Contractor. Sub - Contractors. and /or material suppliers on other projects, without the specific express written consent of the City. The Contractor. Sub - Contractors. and/or material suppliers are granted only a limited license to use and reproduce applicable portions of the Drawings, Specifications, and other documents prepared by the City or its designee, appropriate to and for use in the execution of Services under this Agreement. ARTICLE 15. PLANS, SPECIFICATIONS AND WORKING DRAWINGS 15.1 The City shall have the right to modify the details of the Plans. Specifications. and Working Drawings with additional plans, drawings or additional information as the Services proceed, all of which shall be considered as part of the Contract Documents. 15.2 Where the Contractor believes that the modification or supplement is outside the Scope of Services. the Contractor shall. within (Forty Eight) 48 hours; notify the City that the modification or supplement is outside the scope of Services. At that time the modification or supplement may be rescinded or the Contractor may be required to submit a request for a Change Order proposal. Where the Contractor is notified of the City's position that the modification or supplement is within the scope of Services and the Contractor disagrees. the Contractor shall notify the City that the Contractor reserves the right to make a claim for the time and monies based on the modification or supplement. At no time shall the Contractor refuse to comply with the modification or supplement. 15.3 When, in the opinion of the City, it becomes necessary to explain the Services to be done more fully, or to illustrate the Services further. or to show any changes which may be required, supplementary drawings, with specifications pertaining thereto, will be prepared by the City Manaeer or his Designee. The supplementary drawings shall be binding upon Contractor with the same force as the Contract Documents. Where such supplementary drawings require either less or more than the original quantities of work, appropriate adjustments shall be made by Change Order. 15.4 The City shall have the right to approve and issue Supplemental Instructions setting forth written orders, instructions. or interpretations concerning the Contract Documents or its performance. ii �3J ARTICLE 16. CONTINUING THE SERVICES Contractor shall cam' on the Services and adhere to the progress schedule during all disputes or disagreements with the City. including. without limitation. disputes or disagreements concerning a request for a Change Order. the Contract Amount. the Contract Time. or Time for Completion. The Services shall not be delayed or postponed pending resolution of any disputes or disagreements. All disputes shall be resolved in accordance with Article 34 pertaining to Mediation and Arbitration of Disputes. ARTICLE 17. AUTHORITY OF THE CITY 17.1 The City Manager or his designee shall determine or answer, all questions of any nature whatsoever arising out of. under or in connection with. or in any way relating to or on account of the Services. and/or as to the interpretation of the Services to be performed. 17.2 The Contractor shall be bound by all determinations or orders of the City Manager or his designee and shall promptly respond to requests of the City Manager or his designee, including the withdrawal or modification of any previous order, and regardless of whether the Contractor agrees with the City Manager or his designee's determination or requests. 17.3 All instructions to the Contractor shall be issued in writing. All instructions to the Contractor shall be issued through the City Manager or his designee. 17.4 The City shall have access to all areas of the Project during normal work hours, unless access is required by the City due to health, safety or welfare of the City or the public. The Contractor shall provide safe facilities for such access so the City may perform their functions under the Agreement. The City will make periodic visits to the Project areas to become generally familiar with the progress and quality of the Services. and to determine if the Services are proceeding in accordance with the Contract Documents. 17.5 The City will not be responsible for construction means. methods, techniques, sequences or procedures. or for safety precautions and programs in connection with the Services, and will not be responsible for the Contractor's failure to carry out the Services in accordance with this Agreement. 17.6 The City Manager or his designee will have authority to reject any Services that do not strictly conform to the Contract Document requirements. Whenever it is considered necessary or advisable to ensure the proper implementation of the Contract Documents. the City will have authority to require special inspections or testing of the Services, whether or not such Services are fabricated. installed orcompleted. Neither the City Manager or his designee's authority to act under this Article. nor any decision made by the City Manager or his designee in good faith either to exercise or not to exercise such authority, shall give rise to any duty or responsibility of the City to the Contractor. any Sub - Contractor, supplier or any of their agents, employees, or any other person performing any of the Services. 17.7 The City will not be responsible for the acts or omissions of the Contractor. or anyone employed or contracted directly or indirectly by the Contractor including any Sub - Contractor. or ,r) I r 1. 12 �) '_� any of their agents or employees, or any other persons performing any of the Services. ARTICLE 18. DEFECTIVE WORK 18.1 The Cite shall have the authority to reject or disapprove any work in connection with the Services which is found to be defective. If defective work is found. Contractor shall promptly either correct all defective work or remove such defective work and replace it with non - defective work. Contractor shall bear all direct and indirect costs of such removal or corrections including cost of testing laboratories and personnel. 18.2 Should Contractor fail or refuse to remove or correct any defective work or to make any necessary repairs in accordance with the requirements of the Contract Documents within the time indicated in writing by the City Manager or his designee. the Cite shall have the authority to cause the defective work to be removed or corrected. or make such repairs as may be necessary at Contractor's expense. Any expense incurred by the City in making such removals. corrections or repairs, shall be paid for out of any monies due or which may become due to Contractor. or may be charged against the Payment and Performance Bond. In the event of failure of Contractor to make all necessary repairs promptly and fully, which is not cured in the Cure Period. the City may declare Contractor in default. 18.3 If. within one (1) year after the date of Final Completion or such longer period of time as may be prescribed by the terms of any applicable special warranty required by the Contract Documents. or by any specific provision(s) of the Contract Documents, any of the work performed in connection with the Services is found to be defective or not in accordance with the Contract Documents. Contractor, after receipt of written notice from the City Manager or his designee shall promptly correct such defective or nonconforming work within the time specified by the City Manager or his designee, without cost to the City. Nothing contained herein shall be construed to establish a period of limitation with respect to any other obligation which Contractor might have under the Contract Documents including but not limited to anv claim regarding latent defects. 18.4 Failure to reject any defective work or material shall not in any way prevent later rejection by the City when such defect is discovered, or obligate the City to final acceptance. ARTICLE 19. CORRECTION OF NVORK Where the City becomes aware of faults, defects or non - conformity in any of the work provided under this Agreement or with the work being performed by the Contractor. the City shall issue a Notice to Cure to the Contractor for correction. Thereafter. the Contractor shall have the Cure Period within which to cure the defective work. However, in the event the Contractor becomes aware of faults. defects or non - conforming work that presents a threat to the health. safety or welfare of residents within the City. the Contractor shall take immediate measures to cure the defective work and the 7 (seven) day Cure Period shall not apply. In no event shall the failure of the Citv to bring to the attention of the Contractor such faults act as a waiver or release the Contractor from responsibility or liability for such fault. defect or non - conforming work. 13 ARTICLE 20. WARRANTY OF NIATERIALS AND EQUIPMENT 20.1 Contractor warrants to the Cite that all materials and equipment furnished under this Aereement will be new unless otherwise specified and that all of the Services performed will be of good quality, free from faults and defects and in conformance with the Contract Documents. All equipment and materials not conforming to these requirements, including substitutions not properly approved and authorized, may be considered defective. If required by City. Contractor shall furnish satisfactory evidence as to the kind and quality of materials and equipment. This warranty is not limited by any other provisions within the Contract Documents. 20.2 Contractor shall provide to the City all manufacturers' warranties. All warranties, expressed and /or implied. shall be given to the City for all material and equipment covered by this Aereement. All material and equipment furnished shall be fully guaranteed by the Contractor against factory defects and workmanship. At no expense to the City; the Contractor shall correct any and all apparent and latent defects that are required under applicable law. The Contract Documents may supersede the manufacturer's standard warranty. ARTICLE 21. CHANGES IN THE SERVICES OR TERMS OF CONTRACT DOCUMENTS 21.1 Without invalidating the Agreement and without notice to any Surety, the City reserves and shall have the right. from time to time to make such increases. decreases or other changes in the character or quantity of the Services as may be considered necessary or desirable to complete fully_ and acceptably the Project in a satisfactory manner. Any extra or additional Services within the scope of this Project must be issued in writing in accordance with the requirements of this Agreement 21.2 Any chanties to the terms of the Contract Documents must be contained in a written document, executed by the parties hereto, with the same formality and of equal dignity prior to the initiation of anv Services reflecting such change. This Article shall not prohibit the issuance of Change Orders executed only by the City as hereinafter provided. 21.3 Contractor shall increase or decrease the value of the Performance and Payment Bonds to reflect the Contract Amount, as it may be revised. ARTICLE 22. OSHA COMPLIANCE AND SAFETY PRECAUTIONS 22.1 The Contractor warrants that it will comply with all safety precautions as required by federal. state or local laws. rules. regulations and ordinances 22.2 Contractor warrants that it will adhere to the applicable environmental protection guidelines for the duration of the Project. If hazardous waste materials are used. detected or generated at any time. the Citv Manatier or his designee must be immediately notified by Contractor of each and every occurrence. The Contractor shall comply with all codes, ordinances. rules, orders and other legal requirements of public authorities (including. without limitation. OSHA. EPA. DERM. the City of Sunny Isles Beach, Miami -Dade County. State of Florida. and Florida Building Code) which bear on the performance of the Work. 14 <<j 1 L) 22.3 If an emergency condition should develop during any portion of Services, the Contractor must immediately notify the Cite Manager or his designee of each and every occurrence. The Contractor should also recommend any appropriate course(s) of action to the Cit. ARTICLE 23. PRIORITY OF PROVISIONS 23.1 If there is a conflict or inconsistence between any term. statement requirement, or provision of any Exhibit or Attachment hereto; any document or events referred to herein; or any document incorporated into the Contract Documents by reference and a term, statement, requirement, specifications and plans, or provision of the Contract Documents. the following order of precedence shall apple: 23.2 In the event of conflicts in the Contract Documents the order of precedence stated below shall govern. (i) Revisions and Change Orders to this Agreement (ii) This Agreement, as it may be amended from time to time (iii)Contractors Proposal to the Cite. attached hereto as Attachment "A" (iv)Pricing terms and conditions per County of Fairfax, Virginia, Contract No. RQl 1- 205753 -10A Where provisions of laws. codes, manufacturer's specifications or warranties or industry standards are in conflict, the more restrictive or higher quality shall govern 23.3 In the event of conflicts with any drawings, plans and /or specifications, the priorities stated below shall govern: (i) Schedules, when identified as such shall govern over all other portions of the plans (ii) Specific notes shall govern over all other notes, and all other portions of the plans, unless specifically stated otherwise (iii) Larger scale drawings shall govern over smaller scale drawings (iw) Figured or numerical dimensions shall govern over dimensions obtained by scaling (w) Where provisions of codes. manufacturer's specifications or industry standards are in conflict. the more restrictive or higher quality shall govem 23.4 In the event omissions in the Contract Documents are not complete as to any incidental detail of construction or construction system or with regard to the manner of combining or installing equipment, parts, or materials. such detail shall be deemed to be an implied requirement of the Contract Documents. "Minor Detail" shall include the concept of substantially identical components, where the price of each such component is small. The quality and quantity of the equipment, material, or part so furnished shall conform to trade standards and be compatible with the type, composition, strength, size and profile of the equipment, materials or parts otherwise specified in the Contract Documents. 15 J ARTICLE 24. NOTICES Whenever either party desires to give written notice to the other. such must be addressed to the part` for whom it is intended at the place last specified, and the place for giving of notice shall remain such until it shall have been changed by written notice given in accordance with the provisions of this Article. Notice shall be deemed given on the date received or within Three (3) days of mailing. if mailed through the United States Postal Service. Notice shall be deemed given on the date sent if sent via e -mail or facsimile. Notice shall be deemed given via courier /delivery service upon the initial delivery date by the courier /delivery service. For the present, the parties designate the following as the respective places for giving of notice: If to the Citv: Christopher J. Russo With a cope to: City Manager Hans Ottinot City of Sunny Isles Beach City Attomev 18070 Collins Ave. 4a' Floor City of Sunnv Isles Beach Sunny Isles Beach. Florida 33160 18070 Collins Ave. 4'' Floor Tel: (305) 792 -1701 Sunny Isles Beach. Florida 33160 Tel: (305) 792 -1702 If to the Peter Van Kirk Contractor: Director. Government Security Solutions Safeware- Mallory 3200 Hubbard Road Landover. MD 20785 Tel: (301) 683 -1212 Fax: (804) 236-0429 ARTICLE 25. INDEMNIFICATION 25.1 The Contractor agrees, to the fullest extent permitted by law, to defend, indemnify and hold harmless the City, its agents, representatives. officers. directors, officials and employees from and against claims, damages, losses and expenses (including but not limited to attorney's fees, arbitration costs. and costs of appellate proceedings) relating to; arising out of or resulting from the Contractor's negligent acts, errors, mistakes or omissions relating to Services performed under this Agreement. The Contractor's duty to defend. hold harmless and indemnify the City. its agents. representatives. officers, directors, officials and employees shall arise in connection with any claim. damage, loss or expense that is attributable to bodily injury: sickness: disease: death: or injury to impairment, or destruction of tangible property including loss of use resulting therefrom. caused by anv negligent acts. errors. mistakes or omissions related to Services in the performance of this Agreement including any person for whose acts. errors. mistakes or omissions the Contractor may be legally liable. The parties agree that TEN DOLLARS ($10.00) represents specific consideration to the Contractor for the indemnification provisions set forth in this Agreement. In the event that any action or proceeding is brought against the City by reason of any such claim or demand, Contractor shall, upon written notice from the City, resist and defend such 16 :j action or proceeding by counsel satisfactory to the City. 25.2 The indemnification provided above shall obligate Contractor to defend at its own expense to and through appellate, supplemental or bankruptcy proceeding, or to provide for such defense, at Citv's option, any and all claims of liability and all suits and actions of every name and description covered by this Article, which may be brought against the City whether performed by Contractor, or persons employed or utilized by Contractor. 25.3 This indemnity will survive the cancellation or expiration of this Agreement. This indemnity_ will be interpreted under and construed to conform to the laws of the State of Florida. 25.4 Contractor shall require all Sub - Contractor agreements to include a provision that they shall indemnify the City. ARTICLE 26. INSURANCE REQUIREMENTS 26.1 Contractor shall not start to perform Services under this Agreement until it has delivered to the Cite certificates of insurance clearly indicating that the Contractor is in compliance with the Insurance Requirements required herein. 26.2 Contractor shall. at its sole cost and expense, during the period of any Services being performed under this Agreement, procure and maintain the following minimum insurance coverages to protect the City and Contractor against all loss, claims, damage and liabilities caused by Contractor, its agents or employees, as more particularly set forth below: ❑ Comprehensive General Liability Insurance, including broad form contractual liability coverage for all operations, including, but not limited to, contractual, products, and completed operations, personal injury and property damage liability with minimum limits of One Million Dollars (S1,000,000) per occurrence and Two Million Dollars (S2,000.000.00) aggregate. ❑ Worker's Compensation Insurance and Employer's Liability, as required by Florida Statutes, Chapter 440. ❑ Business Automobile Liability which shall include coverage for all owned, non -owned and hired vehicles for minimum limits of not less than One Million Dollars ($1 000,000) per occurrence. Liability insurance may be arranged by General Liability. Business Automobile Liability, and Professional Liability Insurance for the full limits required, or by a combination of underlying liability policies for lesser limits with the remaining required amounts provided by an Excess or Umbrella Liability policy. The Contractors insurance coverage shall be primary to, and not contribute with. any insurance or self - insurance maintained by the City. Such insurance shall not diminish Contractor's indemnification and obligations hereunder. The insurance policy(ies) shall be issued by companies authorized to do business under the laws of the State of Florida and acceptable to the City with a minimum A.M. Best rating of A- Excellent. All policies shall contain 17 Ij I a waiver of subrogation endorsement. Before any work under this Agreement is performed, and at any time upon request, Contractor shall furnish to the Ciry certificates of insurance evidencing the minimum required coverage and shall be appropriately endorsed for contractual liability, with the City named as additional insured. All policies and certificates shall be in forms and issued by insurance companies acceptable to the Cite Manager or his designee. All insurance policies and certificates of insurance shall provide that the policies may not be canceled or altered without thirty (30) days prior written notice to the Citv. The City reserves the right from time to time to change the insurance coverage and limits of liability required to be maintained by Contractor hereunder. Contractor shall also require and ensure that each of its sub - contractors providing services hereunder (if any) procures and maintains. until the completion of the services. insurance of the types and to the limits specified herein. 26.3 Contractor shall furnish copies of insurance policies pertaining to this Agreement to the Citv N4ana2er or his designee within ten (10) days of written request. If the initial insurance expires prior to the completion of the Services, renewal copies of policies shall be furnished at least thirty (30) days prior to the date of their expiration. 26.4 The Citv reserves the right to require modifications. increases. or changes in the Insurance Requirements, and shall provide a thirty (30) day written notice thereof to the Contractor. ARTICLE 27. PAYMENT AND PERFORMANCE BOND 27.1 Contractor shall not start Work under this Agreement until it has delivered to the City a Performance Bond and a Pavment Bond in the amount of 100% of the total Contract Amount with the City named as the Obligee, as security for the faithful performance of this Agreement and for the payment of all persons performing labor or furnishing materials in connection with Services under this Agreement. 27.2 Pursuant to the requirements of Section 255.05(1)(a), Florida Statutes, as may be amended from time to time. Contractor shall ensure that the Bond(s) are recorded in the public records of Miami -Dade County and provide the City with evidence of such recording. ARTICLE 28. THE CITY'S RIGHT TO TERtMINATE 28.1 The City has the right to terminate this Agreement for any reason or no reason, upon ten (10) days prior written notice to the Contractor stating the date upon which Contractor shall cease all Services under this Agreement and vacate the Project areas. Upon termination of this Agreement. all charts. sketches. studies, drawings, reports and other documents. including electronic documents, related to Services authorized under this Agreement. whether finished or not, must be turned over to the City. The Contractor shall be paid in accordance with provisions of this Agreement, provided that said documentation is turned over to the Citv within twenty (20) business days of termination. Failure to timely deliver the documentation shall be cause to withhold any payments due without recourse by Contractor until all documentation is delivered to the City. 18 <J �i 28.2 If Contractor fails to comply with any term or condition of this Agreement, or fails to perform any of its obligations hereunder. then Contractor shall be in default. Upon the occurrence of a default which is not cured within the Cure Period, in addition to all remedies available to it by lacy, the City may immediately, upon written notice to Contractor, terminate this Agreement whereupon all payments. advances. or other compensation paid by the City to Contractor while Contractor was in default shall be immediately returned to the City. The City may also suspend any payment or part thereof or order a work stoppage until such time as the issues concerning compliance are resolved. Contractor understands and agrees that termination of this Agreement under this Article shall not release Contractor from any obligation accruing prior to the effective date of termination. 28.3 In the event of termination due to default. in addition to the foregoing Contractor shall be liable for all costs and expenses incurred by the City in the re- procurement of the Services required under this Agreement In the event of Default; the City may also issue a Notice to Cure and suspend or withhold payments to Contractor until such time as the actions giving rise to default have been cured. 28.4 A finding of default and subsequent termination for cause may include, without limitation. any of the following: 28.4.1 Contractor fails to obtain and deliver to the City the Insurance certificates. the Bonds, and the Permits in the manner and within the time herein required. 28.4.2 Contractor fails to comply with any of its duties under this Agreement. with any terms or conditions set forth in this Agreement beyond the specified period allowed to cure such default. 28.4.3 Contractor fails to commence the Services within the timeframes provided or contemplated herein, or fails to complete the Services in a timely manner as required by this Agreement. 28.5 Except as otherwise provided for in this Agreement. the City shall provide written notice to cure to Contractor as to a finding of default. and Contractor shall take all necessary action to cure said default within the Cure Period. The City may extend the Cure Period at its sole discretion or terminate the Agreement upon failure of the Contractor to cure such default in the specified timeframe. ARTICLE 29. CONTRACTOR'S RIGHT TO TERNIINATE 29.1 The Contractor may terminate this Agreement if work is stopped for any of the reasons listed below for a period of Sixty (60) days through no act or fault of the Contractor. their agents, employees, or other persons performing any portion of the Services for the Contractor: 29.1.1 Issuance of an Order of the Court or other Public Authority jurisdiction. 29.1.2 An act of government which results in a cessation of Services performed x� 19 �j under this Agreement. ARTICLE 30. UNDISCLOSED LOBBYIST OR AGENT Contractor warrants that it has not employed or retained any company or person to solicit or secure this Agreement and that it has not paid or agreed to pay any person, company, corporation, individual, or firm any fee, commission, percentage, gift, or other consideration contingent upon or resulting from the award or making of this Agreement. The City shall have the right to terminate this Agreement, without giving Contractor the opportunity to Cure. in the event of a breach of this provision. ARTICLE 31. PUBLIC ENTITY CRIMES In accordance with the Public Entity Crimes Act. Section 287.133. Florida Statutes, a person or affiliate who is a contractor. consultant or other provider, who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a bid on a contract to provide any goods or services to the City. may not submit a bid on a contract with the City for the construction or repair of a public building or public work, may not submit bids on leases of real property to the City. may not be awarded or perform work as a contractor, supplier. subcontractor. or sub - consultant under a contract with the City. and may not transact any business with the City in excess of certain amounts provided in Section 287.017. Florida Statutes. Violation of this section by Contractor shall result in termination of this Agreement and ma_y result in Contractor's debarment. ARTICLE 32. JESSICA LUNSFORD ACT All personnel of Contractor and their subcontractor(s) who perform any Services under this Agreement must first satisfy the requirements and conditions of the Florida Sexual Predators Act (also known as the "Jessica Lunsford Act') under Section 775.2 L F.S. when required, including background screening requirements, as provided by Florida law. ARTICLE 33. MATERIALITY AND WAIVER OF BREACH 33.1 The Citv and Contractor agree that each requirement, duty. and obligation set forth in these Contract Documents is substantial and important to the formation of this Agreement. 33.2 The City's failure to enforce any provision of this Agreement shall not be deemed a waiver of such provision or modification of this Agreement. A waiver of any breach of a provision of this Agreement shall not be deemed a waiver of any subsequent breach and shall not be construed to be a modification of the terms of this Agreement. ARTICLE 34. FORCE MAJEURE Should any party fail to perform its obligations under this Agreement due to a condition of force majeure. as that term is interpreted under Florida law, and specifically including but not limited to Acts of God. Hurricanes, Tropical Storms. fire. flood. earthquakes and the unavailability of materials, equipment or labor resulting from said events. then the time for performance of said 20 t1 3 obligation hereunder will be extended by a period reasonably commensurate with the cause of such failure to perform or cure. If the Contractor is delayed in performing any obligation under this Agreement due to a force majeure condition. the Contractor shall request a time extension from the City Manager or his designee within three (3) working days of said force majeure occurrence. Any time extension shall be subject to mutual agreement and shall not be cause for any claim by the Contractor for extra compensation unless additional services are required. Events of Force i\-lajeure do not include acts or omissions of Sub- Contractors. ARTICLE 35. tMEDIATION AND ARBITRATION OF DISPUTES The merits of anv dispute arising under. out of. in connection with; or in relation to this agreement. or the making or validity thereof. or its interpretation, or any breach thereof, shall be determined and settled by Arbitration before an Arbitrator in the State of Florida. pursuant to the Commercial Arbitration Rules then obtaining of the American Arbitration Association. If the parties hereto are unable to agree upon the selection of an arbitrator. such arbitration shall be held before the American Arbitration Association. Anv award rendered shall be final and conclusive upon the parties hereto and ajudgment thereon may be entered in the highest court of the State of Florida having jurisdiction. Before submitting a dispute to Arbitration, the parties shall first attempt to resolve the dispute amicably. In the event that the parties hereto are unable to resolve the dispute amicably. either part may give notice for a Mediation session before a Mediator appointed by mutual agreement (hereinafter the "Mediator "). If the parties are unable to agree upon the selection of mediator. such mediation shall be held before the American Arbitration Association. The Mediator shall make a recommendation to the parties in the form of a written mediated settlement agreement. Each party to the dispute shall sign such agreement after receipt of the same or immediately file a demand for Arbitration. in which event the parties shall proceed to Arbitration in accordance with the previous paragraph. All costs of the Arbitration. including Mediation and the legal action to confirm and enforce the arbitrator's award at the administrative, judicial and /or appellate levels, as the case may be, including the reasonable legal fees of both parties shall be paid by the non - prevailing party, or, if neither party prevails on the whole, each party shall be responsible for a portion of the costs of Arbitration and Mediation as may be determined by the court on confirmation. ARTICLE 36. APPLICABLE LAW AND VENUE This Agreement shall be interpreted and construed in accordance with and governed by the laws of the State of Florida. Any suit or action brought by any party. concerning this Agreement. or arising out of this Agreement. shall be brought in Miami -Dade County, Florida. Each part shall bear its own attomey's fees except in actions arising out of Contractor's duties to indemnify the City under this Agreement where Contractor shall pay the City's reasonable attorney's fees. ARTICLE 37. PERDIITS AND LICENSES ( "PERMITS ") Except as otherwise provided within the Agreement, all permits and licenses required by i� 21 federal. state or local lays, rules and regulations necessary for the prosecution of the Work undertaken by Contractor pursuant to this Agreement shall be secured and paid for by Contractor. It is Contractor's responsibility to have and maintain appropriate Certificate(s) of Competency, valid for the Work to be performed and valid for the jurisdiction in which the Work is to be performed for all persons working on the Project for whom a Certificate of Competency is required. ARTICLE 38. AUDIT RIGHTS 38.1 Contractor's records which shall include but not be limited to accounting records, payroll time sheets, cancelled payroll checks. W-2's. 1099's. written policies and procedures, computer records. disks and software. videos. photographs, subcontract files, originals estimates. estimating worksheets. correspondence. change order files (including documentation covering negotiated settlements), and any other supporting evidence necessary to substantiate charges related to this Agreement (all the foregoing hereinafter referred to as "records ") shall be open to inspection and subject to audit and /or reproduction, during normal working hours. by the City to the extent necessary to adequately permit evaluation and verification of any invoices. payments or claims submitted by the Contractor or any of his payees pursuant to the execution of the Agreement. Such records subject to examination shall also include, but not be limited to, those records necessary to evaluate and verify direct and indirect costs (including overhead allocations) as they may apply to costs associated with this Agreement. 38.2 Records subject to the provisions of Public Record Law. Florida Statutes Chapter 119, shall be kept in accordance with such statute. Otherwise, for the purpose of such audits, inspections. examinations and evaluations. the City shall have access to said records from the effective date of this Agreement, for the duration of the Services, and until 5 years after the date of final payment by the City to Contractor pursuant to this Agreement. 38.3 The City's agent or its authorized representative shall have access to the Contractor's facilities. shall have access to all necessary records, and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with this provision. The City or its authorized representative shall give auditees reasonable advance notice of intended audits. 38.4 If an audit inspection or examination in accordance with this Article discloses overcharges in excess of I % except negotiated fees by the Contractor to the City. the actual cost of the Citv`s audit shall be paid by the Contractor. If the audit discloses contract billing or charges to which Contractor is not contractually entitled. Contractor shall pay over to the City said sum within Twenty (20) days of receipt of a written demand by the City Manager or his designee, unless otherwise agreed to by both parties in writing. ARTICLE 39. COMPLIANCE WITH LAWS, NONDISCRIMINATION, EQUAL EMPLOYMENT OPPORTUNITY. AND AMERICANS WITH DISABILITIES ACT 39.1 Contractor shall comply with all applicable lays, codes, ordinances. rules, regulations and resolutions and all applicable guidelines and standards in performing its duties. t>v responsibilities. and obligations related to this Agreement, including specifically. but without limitation, where applicable. the Contract Work Hours and Safety- Standards Act. the Lead - Based Paint Poisoning Prevention Act and anv other laws. ordinances and regulations made applicable to this Agreement by the Contract Documents or the source of funds. 39.2 Contractor warrants and represents that it does not and will not engage in discriminatory practices and that there shall be no discrimination in connection with Contractors performance under this Agreement on account of race. color. sex. religion, age, handicap, marital status or national origin. Contractor further covenants that no otherwise qualified individual shall. solely by reason of his/her race, color, sex, religion, age, handicap, marital status or national origin, be excluded from participation in, be denied services, or be subject to discrimination under any provision of this Agreement. 39.3 Contractor shall affirmatively comply with all applicable provisions of the Americans with Disabilities Act (ADA) in the course of providing anv services funded by the Citv. includine Titles I and II of the ADA (regarding nondiscrimination on the basis of disability), and all applicable regulations. guidelines. and standards. In addition. Contractor shall take affirmative steps to ensure nondiscrimination in employment against disabled persons. ARTICLE 40. INDEPENDENT CONTRACTOR The Consultant is an independent contractor and shall be treated as such for all purposes. Nothing contained in this Agreement or any action of the parties shall be construed to constitute or to render the Consultant an employee, partner, agent, shareholder, officer or in any other capacity other than as an independent contractor other than those obligations which have been or shall have been undertaken by the City. Consultant shall be responsible for any and all of its own expenses in performing its duties as contemplated under this Agreement. The City shall not be responsible for any expense incurred by the Consultant. The Citv shall have no duty to withhold any Federal income taxes or pay Social Security services and that such obligations shall be that of the Consultant. other than those set forth in this Agreement. Consultant shall furnish its own transportation. office and other supplies as it determines necessary in carrying out its duties under this Agreement. ARTICLE 41. SUCCESSORS AND ASSIGNS 41.1 The performance of this Agreement shall not be transferred, pledged. sold. delegated or assigned, in whole or in part, by the Contractor without the express written consent of the City. It is understood that a sale of the majority of the stock or partnership shares of the Contractor, a merger or bulk sale, an assignment for the benefit of creditors shall each be deemed transactions that would constitute an assignment or sale hereunder requiring prior City approval. 41.2 The Contractor's services are unique in nature and any transference without City approval shall be cause for the City to nullify this Agreement. Any assignment without the City's consent shall be null and void. The Contractor shall have no recourse from such cancellation. The City may require bonding. other security. certified financial statements and tax returns from anv proposed assignee and the execution of an assignment /assumption r�� aereement in a form satisfactory to the City_ Attorney as a condition precedent to considering approval of an assignment. ARTICLE 42. CONTINGENCY CLAUSE Funding for this Aereement is contingent on the availability of funds and continued authorization for the Services described herein and this Agreement is subject to amendment or termination due to lack of funds. reduction of funds and /or change in regulations, upon thirty (30) days written notice. ARTICLE 43. JOINT PREPARATION- INTERPRETATION The language of this Agreement has been agreed to by both parties to express their mutual intent and no rule of strict construction shall be applied against either party hereto. The headings contained in this Agreement are for reference purposes only and shall not affect in any waw the meaning or interpretation of this Agreement. All personal pronouns used in this Agreement shall include the other gender. and the singular shall include the plural, and vice versa. unless the context otherwise requires. Terms such as "herein." "hereof." "hereunder." and "hereinafter" refer to this Agreement as a whole and not to amv particular sentence, article, paragraph, or section where they appear, unless the context otherwise requires. Whenever reference is made to a Section or Article of this Agreement, such reference is to the Section or Article as a whole. including all of the subsections of such Section or Article, unless the reference is made to a particular subsection or subparagraph of such section or article. ARTICLE 44. ANIENDMENTS No modification. amendment. or alteration in the terms or conditions contained herein shall be effective unless contained in a written document prepared with the same or similar formality as this Agreement and executed by the Citv and Contractor. ARTICLE 45. SEVERABILITY In the event that any provision of this Agreement is determined by a Court of competent jurisdiction to be illegal or unenforceable, then such unenforceable or unlawful provision shall be excised from this Agreement, and the remainder of this Agreement shall continue in full force and effect. ARTICLE 46. ENTIRE AGREEMENT This Agreement, together with the Contract Documents, represent the entire and integrated Agreement between the City and the Contractor and supersedes all prior negotiations, representations or agreements. written or oral. This Agreement may not be amended. changed, modified. or otherwise altered in any respect, at any time after the execution hereof. except by a written document executed with the same formality and equal dignity herewith. Waiver by either party of a breach of any provision of this Agreement shall not be deemed to be a waiver of any other breach of any provision of this Agreement. In 24 v 1 .J ARTICLE 46. ENTIRE AGREEMENT This Agreement, together with the Contract Documents, represent the entire and integrated Agreement between the City and the Contractor and supersedes all prior negotiations, representations or agreements, written or oral. This Agreement may not be amended, changed, modified, or otherwise altered in any respect, at any time after the execution hereof, except by a written document executed with the same formality and equal dignity - herewith. Waiver by either party of a breach of any provision of this Agreement shall not be deemed to be a waiver of any other breach of any provision of this Agreement. WITNESS: Signature Print Name S Si ature - /z 31I Y Print Name c " ATTEST; _ B Jane A. es_ • i 9 SAFEWARE, INC., BY: ,�3& Print and sign name of Corp: rep. Peter Van Kirk, Safeware Director of Government`Security Solutions CITY OF SUNNY ISLES BEACH ¢� BY: Q1/N(irii MMC; City Glerk rman S. Edelcup, Mayor Safewatw Attachment «A» SAFETY•SERVI CE- RESPONSE July 1. 2014 From: Mr. Peter Van Kirk Safeware. Inc. Director. Government Security 3200 Hubbard Road Landover. Marvland 20785 To: Mr. Michael A. Grandinetti Sunny Isles Beach Police Department Captain 18070 Collins Avenue Sunny Isles Beach, Florida 33160 Dear Capt Grandinetti. Safeware is pleased to provide to the City of Sunny Isles Beach. Florida a multiple zone security solution with an expandable high bandwidth video surveillance system which includes Closed Circuit TV Cameras, and the wired & wireless connectivity to support the CCTV System. This Safeware Security Solution is being provided by the partnership team consisting of Safeware. Inc. and ATCi. This solution is being procured under the Safeware US Communities government contract vehicle and all Safeware US Communities contract pricing, terms and conditions are compliant under the US Communities government contract titled: "Homeland Security & Public Safetv/Emergency Preparedness' contract 4: 4400001839 The U.S. Communities contract aggregates the purchasing power of more than 90.000 public agencies nationwide by offering Participating Public Agencies the ability to make purchases through existing, competitively solicited contracts between a supplier and a lead public agency. Currently there are more than 55,000 participating State & Local government agencies utilizing the US Communities contract. Utilizing this contract saves agencies time & money. Since the contract was already competed there is no need for our city to replicate the RFP process plus with the aggregate nationwide purchasing power, this contract provides us a 41 % or greater discount off of the vendors list price. With the procurement timeframe being compressed this grants us the ability to meet critical project deadlines. Lastly by utilizing this contract we are not publically exposing our security vulnerabilities. This is a complete multi - phase, tum -key security solution and it is being provided at a "firm fixed price" as defined in the line item pricing Safeware submitted to the city (see attached financial summary page listed below). In closing. Safeware appreciates the trust the City of Sunny Isles Beach has extended in our team and we feel this security solution will best serve the security and public safety needs of the City of Sunny Isles Beach, Florida. Sincerely. Peter Van Kirk Director, Government Security Solutions Safeware Financial Summary Page Isurnmary Scope Amount Year 2 Year 3 Year 4 Year 5 Zone 1- Heritage Park S 45,148.00 S 1,805.92 S 1,860.10 S 1,915.90 S 2,011.70 Zone 2- Heritage Park Parking Garage S 177,521.14 S 7,100.85 $ 7,313.87 $ 7,533.29 _$ 7,909.95 Zone 3- Golden Shores Park S 45,276.27 S 1,811.05 - S 1,8_65.38 $ _1,921.34 $ 2,017.41 Zone 4 -Under Highway S 36,490.55 $ 1,459.62 $ 1,503.41 S 1,548.51.5 1,625.94 Zone 5- Basketball Court S 28,623.87 $ 1,144.95 -S 1,179.30 S 1,214.68 S 1,275.42 Zone 6- Public Works S 69,387.47 $ 2,775.50 $ 2,858.76 $ 2,944.53 S 3,091.75 Zone 7- PCP S 216,990.40 $ 8,679.62 ^5 8,940.00 S 9,208_20 S 9,668.61 Zone 8- Gwen Margolis Park $ 102,509.95 S 4,100.40 $ 41223.41 $ 4,350.11 $ 4,567.62 Zone 9 -Town Center Park $ 135,821.27 $ 5,432.85 S 5,595.84 S 5,763.71 $ 6,051.90 Zone 10- Pier Park $ 85,936.55 S 3,437.46 $ 3,540.59 S 3,646.80 $ 3,829.14 Zone 11- Control Room S 88,686.02 $ 3,547.44 $ 3,653.86 S 3,763.48 $ 3,951.65 Total Investment S 1,032,391.49 $ 41,295.66 S 42,534.53 S 43,810.57 $ 46,001.09 lnticipated Cost no mark up. "Project contingency is set aside for mutually agreeable unforeseen issues that would entail additional labor and or material to be approved by Sunny Isles and the Safeware Team. Project Permit Fees S 17,800.00 1 lBonding Fees if desired 2.5% $ 26,117.90 IProject Labor and material contingency $79,835.00 " lnticipated Cost no mark up. "Project contingency is set aside for mutually agreeable unforeseen issues that would entail additional labor and or material to be approved by Sunny Isles and the Safeware Team. Summary of Services: AW'MmAdd�ML (D 4905UW SAFETY-SERVICE-RESPONSE The Safeware Team consisting of Safeware Inc and ATCi Communications, Inc. herein known as the Safeware Team; has followed the provided design criteria by the City of Sunny Isles Beach consultant and followed product criteria based on meetings held after evaluation phase held over the last several months by City personnel. The proposal enclosed will provide City Video Surveillance and upgrade of Public WI -Fi based on upgrades to backhaul equipment chosen by The Safeware Team personnel. Zone #1- Heritage Park: The Safeware Team will supply and install the following equipment: • (5) Fixed IP Dome cameras manufactured by Axis Communications an industry leader in the IP surveillance marketplace. The model number chosen for the coverage are the IP 66 Rated Axis P3367 -VE. AXIS P3367 -VE Network Camera Superb 5 megapixel, light - sensitive outdoor foxed dome with remote focus. -and zoom 0 • Superb video in 5MP or HDTV 1080p quality • P -Iris control • Multiple H.264 streams and Motion JPEG video streams • Remote focus and zoom • Outdoor - ready, IP66 and NEMA 4X rating Safewaille SAFETY•SERVICE•RESPONSE • (1) Pan Tilt Zoom cameraman ufactu red by Samsung. SNP- 6200RH with its adaptive Infra Red illumination Technology. 0 Full HD(1080p) image 30fps streaming Built -in 20x (4.45 -89mm) optical zoom lens 0 Min. Illumination OLux (IR distance 100m) 0 H.264 /MIPEG dual codec 0 3600 Endless Pan, Tilt/ Zoom 0 WDR, UPnP supports 0 IP66, IK10 Grade 0 Video privacy management supports • (1) NEMA Enclosure with termination equipment for Active equipment requirements for communication to recorder located at Heritage Park Parking Garage. • (1) Ruggedized 10 Port High Temperature rated Switch by Antaira Model LNP- 1002 -GN including the Fiber GBIC modules for Fiber Optics Backbone Communication to Heritage Park Parking Garage. .�7llCee . 4 0 U IA/q/"�� SAFETY•SERVICE•RESPONSE Vf�L �J L . 0 5.6 Gbps Back -Plane (Switching Fabric) o Supports Port Based VLAN and IEEE802.1Q Tag VLAN o IEEE802.1p Class of Service Support o Quality of Service Supports Port Based, Tag Based, and IPv4 Type of Service o Xtreme Ring Redundancy Function (<20 ms Recovery Time) o Supports Rapid Spanning Tree /Spanning Tree o Supports IGMP v1 and Query Mode. Up to 256 Groups. o SNMP, Web Management, RMON o System Event Log o Management IP Security o Power Redundancy o Easy Configuration Design o DIN -Rail and Wall Mount Design o (1) 12 Strand Fiber optics underground rated cabling will be provided and installed for communication back to the Head end room for the Heritage Park Parking Garage from the junction point at the stage area within Heritage Park: �.,. \�_ Bill of Materials for Zone 1- Heritage Park. r1(•].I411 The Safeware Team Heritage Park 6/27/14 INTERSECTION CAMERAS SAFETY•SERVICE•RESPONSE N U MANUFACTU Q TOT MODEL o Description M RER T AL THE THE ea SAFEWARE SAFEWARE 6 6 SITE HANDHOLE(Installed) TEAM TEAM THE THE ea SAFEWARE SAFEWARE 1 ELECTRICAL SERVICE AT LOCATION TEAM TEAM 1 THE THE E SAFEWARE SAFEWARE 1 1 A ELECTRICAL CABLE SERVICE TEAM TEAM THE THE E SAFEWARE SAFEWARE 1 1 A Conduit Infrastructure- Z01 TEAM TEAM THE THE E SAFEWARE SAFEWARE 1 1 A TRENCHING ELECTRICAL- not to exceed Z01 TEAM TEAM Exterior PTZ SNP- 6200RH- SAMSUNG A SAMSUNG SNP- 6200RH 1 1 POLE MOUNTING KIT - SBP- 30OPM- SAMSUNG A SAMSUNG SBP -30OPM 1 1 5MP DAY /NIGHT CAMERA- OUTDOOR- LONG E gX15 P3367 -VE 5 5 RANGE A E MOUNTING HARDWARE FOR AXIS CAMERA I AXIS PMT 5 5 10 port High Temp field mounted POE switch E ANTARIA LNP- 1002 -GN 1 1 10 /100 8, 2 10 /100 /1000 ports A D401N Power supply for POE switch A ANTARIA O 1 1 SPF GBIC MODULE for field switch req. for multi E ANTARIA SNP -M 2 2 mode A VMS NEMA ENCLOSURE PACKAGE(Includes: All E Custom Custom 1 1 necessary Mounting Brackets) A E VMS 314001 6 1 6 1- Channel of Net Video. A LABOR REQUIREMENTS- INSTALLATION, TRIM H The Safeware The Safeware 3 314 OUT, PROGRAMMING- Z01 R Team Team 1 " \ SAFETY•SERVICE•RESPONSE 4 E The Safeware The Safeware 1 10 AS BUILTS DRAWINGS AND ENGINEERING -ZO1 A Team Team 0 E The Safeware The Safeware 3 30 PROJECT MANAGEMENT- Z01 A Team Team 0 E The Safeware The Safeware 1 1 MISCELLANEOUS COST - CONNECTORS, Boxes- Z01 A Team Team TOTAL COST OF PROJECT INCLUDING SAFEWARE PRICING $45,148.00 Zone #2- Heritage Park Parking Garage: Heritage Park Parking Garage will be one of the main Hub locations for a portion of the overall project at this location recording for the following will take place: • Heritage Park. • Heritage Park Parking Garage • Walking Path cameras • Golden Shores Park cameras • Parking In /Out • Basketball Court o Public Works The Safeware Team will supply and install the following equipment: • (38) Fixed IP Dome cameras manufactured by Axis Communications an industry leader in the IP surveillance marketplace. The model number chosen for the coverage are the IP 66 Rated Axis P3346 -VE. AXIS P3346 -VE Network Camera Superb HDTV 1;08Op vandal= I resistant fixed dome with remote focus arid= zo.orn for outdoor use • Superb video quality in HDTV 1080p or 3MP • WDR- dynamic capture and Light finder technology • H.264 main profile and multiple H.264 streams • Remote focus and zoom • Outdoor -ready and vandal- resistant design • (2) Axis Communications Q1765LE for Tag Optimization for Entrance and Exit to the parking garage area. 0 18x optical zoom and autofocus o Built -in IR illumination 0 HDTV 1080p and H.264 0 IP66- and NEMA 4X -rated for outdoor use SAFETY•SERVICE•RESPONSE • Axis' unique Corridor Format • Slim, bullet -style design • (1) Pan Tilt Zoom camera manufactured by Samsung. SNP- 6200RH with its adaptive Infra Red illumination Technology. 0 Full HD(1080p) image 30fps streaming Built -in 20x (4.45 -89mm) optical zoom lens 0 Min. Illumination OLux (IR distance 100m) 0 H.264 /MJPEG dual codec 0 3600 Endless Pan, Tilt/ Zoom 0 WDR, UPnP supports 0 IP66, IK10 Grade 0 Video privacy management supports • (2) NEMA Enclosure with termination equipment for Active equipment requirements for communication to recorder located at heritage Park Parking Garage. • (2) Ruggedized 10 Port High Temperature rated Switch by Antaira Model LNP- 1002 -GN including the Fiber GBIC modules for Fiber Optics Backbone Communication to Heritage Park Parking Garage MDF recording location. Sefeware® SAFETY-SERVICE-RESPONSE 4C ,� .0 • 5.6 Gbps Back -Plane (Switching Fabric) • Supports Port Based VLAN and IEEE802.1Q Tag VLAN • IEEE802.1p Class of Service Support • Quality of Service Supports Port Based, Tag Based, and IPv4 Type of Service • Xtreme Ring Redundancy Function ( <20 ms Recovery Time) • Supports Rapid Spanning Tree /Spanning Tree • Supports IGMP v1 and Query Mode. Up to 256 Groups. • SNMP, Web Management, RMON • System Event Log • Management IP Security • Power Redundancy • Easy Configuration Design • DIN -Rail and Wall Mount Design (2) Cisco Catalyst 2900 Series Gigabit Switch with Fiber GBIC Modules • Enclosure Type: Rack - mountable - 1U • Subtype: Gigabit Ethernet • Ports: 24 x 10 /100 /1000 + 4 x SFP • Performance: Switching capacity : 176 Gbps Forwarding packet size) : 41.7 Mpps o MAC Address Table Size: 8K entries o Remote Management Protocol: SNMP 1, SNMP 2, RMON 9, Telnet, SNMP 3, SNMP 2c, HTTP, HTTPS, TFTP, SSH (1) Custom Configuration recording Storage Server by Dell. performance (64 -byte 1, RMON 2, RMON 3, RMON SAFETY•SERVICE•RESPONSE Featuring embedded hypervisors, large memory capacity with 18 DIMM slots and 4 integrated network connections, Dell Power Edge delivers better overall system performance and greater virtual machine - per -server capacity. The Solution for the Parking Garage has been configured for recording to be stored for 15 days based on Motion detection of the cameras at 15 Frames per second (FPS) of recording. Please note that a lockable cabinet will be provided for this location. Backhaul equipment: For Backhaul transmission The Safeware Team will supply and install equipment manufactured by Cambium Networks which will create a stable and proven wireless environment for communication back to the Police Department. QOS will be utilized for Public Wi -Fi access Public Wi -Fi: 0 Cambium Networks" Connecting the UmmnnectedTM e —Z EnGenious Business Class High Power Wireless The Safeware Team will supply and install (2) Public Wi -Fi Access points that will enable high speed connections and multiple concurrent users to give access to users at Heritage Park. The Safewaow SAFETY•SERVICE•RESPONSE Safeware Team has chosen EnGenious Access points which are proven in the Wi -Fi industry for the applications required by the City of Sunny Isles Beach. Bill of Materials for Zone 2- Heritage Parking Garage: ZONE 2 The Safeware Team Heritage Park- Parking Garage- revised 6/27/14 INTERSECTION CAMERAS N U MANUFACTU Q TOT MODEL o Description M RER T AL THE THE E SAFEWARE SAFEWARE 1 1 A Conduit Infrastructure- Z02 TEAM TEAM WIRELESS THE THE E SAFEWARE SAFEWARE 2 2 A Hardware to mount Backhaul Equipment TEAM TEAM Rugged Switches, Radios, Backhaul Antennas, E Cambium Cambium 2 2 Surge Suppression, Surge Arrestors A mult. mult. Labor Installation for standard poles, roof and THE THE E towers. Includes brackets, straps, engineering, and SAFEWARE SAFEWARE 2 2 A wind load analysis, alignment and setup TEAM TEAM Exterior PTZ SNP- 6200RH- SAMSUNG A SAMSUNG SNP- 6200RH 1 1 POLE MOUNTING KIT - SBP- 30OPM- SAMSUNG A SAMSUNG SBP -30OPM 1 1 3MP DAVNIGHT CAMERA- OUTDOOR A AXIS P3346 -VE S 38 BULLET CAMERA FOR LPR OPTIMIZATION A AXIS Q1765 -LE 2 2 MOUNTING HARDWARE FOR AXIS CAMERA A AXIS PMT 4 40 10 port High Temp field mounted POE switch E ANTARIA LNP- 1002 -GN 2 2 10 /100 8, 2 10 /100 /1000 ports A E DRP -240- Power supply for POE switch ANTARIA 2 2 A 40INC SPF GBIC MODULE for field switch req. for multi E ANTARIA SNP -M 4 4 mode A ALTRONIX Individually Fused A Altronix PS -W 1 1 VMS NEMA ENCLOSURE PACKAGE(Includes: All E Custom Custom 2 2 necessary Mounting Brackets) A �471�Ce.e� \ SAFETY•SERVICE•RESPONSE 1- Channel of Net Video. A VMS 314001 i 41 CONFIG. SERVER FOR RACK MOUNT APPLICATIONS- UP TO 63 CHANNELS- 40 TB A VMS 90477 1 1 CONFIG.- Z02- 1S days recording CISCO SWITCH ** E Cisco WS- C2960S- 1 1 A 24TS -L CISCO SWITCH WITH GBIC MODULES A Cisco MM -GBIC 2 2 24 port sPatch Panel Cat6 A Signamax 24 port 2 2 KVM W/17" LCD MONITOR A Tripplite 17" Slide tray 1 1 The Safeware The Safeware FT 1 1 CABLING INFRASTRUCTURE Team Team 9 H The Safeware The Safeware LABOR INSTALLATION, DEVICE MOUNTING, 8 989 R Team Team PROGRAMMING AND SETUP- Z02 9 E The Safeware The Safeware 4 41 AS BUILTS DRAWINGS AND ENGINEERING -Z02 A Team Team 1 1 E The Safeware The Safeware 0 100 A Team Team PROJECT MANAGEMENT -Z02 0 E The Safeware The Safeware 1 1 MISCELLANEOUS COST - CONNECTORS, Boxes- Z02 A Team Team TOTAL COST OF PROJECT INCLUDING SAFEWARE PRICING Zone #3- Golden Shores Park: ;wary® SAFETY- SERVICE•RESPONSE The Safeware Team will supply and install the following equipment: (3) Fixed IP Dome cameras manufactured by Axis Communications an industry leader in the IP surveillance marketplace. The model number chosen for the coverage are the IP 66 Rated Axis P3364 -LVE. Due to the low lighting conditions we have utilized the IR model to maximize object detection capability. Came • Superb video in IMP or HDTV 720p quality • Multiple H.264 videos streams • Easy installation including remote zoom and focus • Built -in high - efficiency, long -life LED's for IR illumination • Outdoor -ready and vandal- resistant design • (1) Pan Tilt Zoom camera manufactured by Samsung. SNP- 6200RH with its adaptive Infra Red illumination Technology. 4059M e® SAFETY•SERVICE•RESPONSE 0 Full HD(1080p) image 30fps streaming Built -in 20x (4.45 -89mm) optical zoom lens 0 Min. Illumination OLux (IR distance 100m) 0 H.264 /M]PEG dual codec 0 3600 Endless Pan, Tilt/ Zoom 0 WDR, UPnP supports 0 IP66, IK10 Grade 0 Video privacy management supports • (1) NEMA Enclosure with termination equipment for Active equipment requirements for communication to recorder located at heritage Park Parking Garage. 404MM ® SAFETY•SERVICE•RESPONSE • (1) Ruggedized 10 Port High Temperature rated Switch by Antaira Model LNP- 1002 -GN including the Fiber GBIC modules for Fiber Optics Backbone Communication to Heritage Park Parking Garage. G'- • 5.6 Gbps Back -Plane (Switching Fabric) • Supports Port Based VLAN and IEEE802.1Q Tag VLAN • IEEE802.1p Class of Service Support • Quality of Service Supports Port Based, Tag Based, and IPv4 Type of Service • Xtreme Ring Redundancy Function (<20 ms Recovery Time) • Supports Rapid Spanning Tree /Spanning Tree • Supports IGMP v1 and Query Mode. Up to 256 Groups. • SNMP, Web Management, RMON • System Event Log • Management IP Security • Power Redundancy • Easy Configuration Design • DIN -Rail and Wall Mount Design o (1) 12 Strand Fiber optics underground rated cabling will be provided And installed for communication back to the Head end room for the Heritage Park Parking Garage: o (1) Pre Cast concrete pole 35' height for mounting of camera at the designated location per the City provided drawings. C f mmI� OC Bill of Materials for Zone 3- Golden Shores Park: ZONE 3 The Safeware Team Golden Shores Park- revised 6/27/14 INTERSECTION CAMERAS N U MANUFACTU Q TOT MODEL o Description M RER T AL THE THE ea SAFEWARE SAFEWARE 5 5 SITE HANDHOLE(Installed) -Z03 TEAM TEAM THE THE ea SAFEWARE SAFEWARE 1 ELECTRICAL SERVICE AT LOCATION- Z03 TEAM TEAM 1 THE THE E SAFEWARE SAFEWARE 1 1 A Conduit Infrastructure- Z03 TEAM TEAM THE THE E SAFEWARE SAFEWARE 1 1 A CONCRETE pole, installation, and lightning rod TEAM TEAM THE THE E SAFEWARE SAFEWARE 1 1 A TRENCHING ELECTRICAL- not to exceed Z03 TEAM TEAM Exterior PTZ SNP- 6200RH- SAMSUNG E SAMSUNG SNP- 6200RH 1 1 77T/r a w _ (A) �,.. awmwary SAFETY•SERVICE•RESPONSE A POLE MOUNTING KIT - SBP- 30OPM- SAMSUNG A SAMSUNG SBP -30OPM 1 1 720P DAY /NIGHT CAMERA- OUTDOOR with IR E AXIS P3364 -VE 3 3 illumination- LOW LIGHT A MOUNTING HARDWARE FOR AXIS CAMERA A AXIS PMT 3 3 10 port High Temp field mounted POE switch E 10/1008, 2 10 /100 /1000 ports A ANTARIA LNP- 1002 -GN 1 1 DRP-24 Power supply for POE switch A ANTARIA 2 2 SPF GBIC MODULE for field switch req. for multi E ANTARIA SNP -M 2 2 mode A Fiber Optics LIU Connector Housing for field E CORNING LIU 1 1 mount A ALTRONIX Individually Fused A Altronix PS -W 1 1 VMS NEMA ENCLOSURE PACKAGE(Includes: All E Custom Custom 1 1 necessary Mounting Brackets)- Z03 A E VMS 314001 4 4 1- Channel of Net Video. A E WS- C2960S- CISCO SWITCH ** Cisco 2 2 A 24TS -L CISCO SWITCH WITH GBIC MODULES A Cisco MM -GBIC 4 4 24 port sPatch Panel Cat6 A Signamax 24 Port 2 2 The Safeware The Safeware FT 1 1 CABLING INFRASTRUCTURE- COPPER -Z03 Team Team The Safeware The Safeware FT 1 1 CABLING INFRASTRUCTURE- FIBER OPTICS- Z03 Team Team 2 H The Safeware The Safeware LABOR INSTALLATION, DEVICE MOUNTING, 1 215 R Team Team PROGRAMMING AND SETUP- Z03 5 E The Safeware The Safeware 9 9 AS BUILTS DRAWINGS AND ENGINEERING- Z03 A Team Team E The Safeware The Safeware 2 22 PROJECT MANAGEMENT -Z03 A Team Team 2 E The Safeware The Safeware 1 1 MISCELLANEOUS COST - CONNECTORS, Boxes- Z03 A Team Team TOTAL COST OF PROJECT INCLUDING SAFEWARE PRICING $45,276.27 Zone #4- Walking Path and Parking In /Out: S�ewar+�® SAFETY•SERVICE•RESPONSE The Safeware Team will supply and install the following equipment: o Walking Path: • (2) Fixed IP Dome cameras manufactured by Axis Communications an industry leader in the IP surveillance marketplace. The model number chosen for the coverage are the IP 66 Rated Axis P3346 -VE with its high 3MP resolution. Cameras will be installed on the new concrete pole to be installed by The Safeware Team. AXIS P3346 -VE Network Camera -Superb HDTV 1.080p vandal= f resistant fixed dome with remote focus grid zoom for outdoor use • Superb video quality in HDTV 1080p or 3MP • WDR- dynamic capture and Light finder technology • H.264 main profile and multiple H.264 streams • Remote focus and zoom • Outdoor -ready and vandal- resistant design o Parking In /Out: • (2) Fixed IP Dome cameras manufactured by Axis Communications an industry leader in the IP surveillance marketplace. The model number chosen for the coverage are the IP 66 Rated Axis P3367 -VE with its high SMP resolution. Cameras will be installed under the highway. AXIS P3367 -VE Network Camera Superb 5 mega -pixel light- sensitive outdoor fixed dome with remote focus and zoom o/ "'�o • Superb video in SMP or HDTV 1080p quality • P -Iris control • Multiple H.264 streams and Motion JPEG video streams • Easy installation with remote focus and zoom • Outdoor - ready, IP66 and NEMA 4X rating • (1) NEMA Enclosure with termination equipment for Active equipment requirements for communication to recorder located at heritage Park Parking Garage which will be installed at the Pole location. Safeware® SAFETY•SERVICE•RESPONSE (1) Ruggedized 10 Port High Temperature rated Switch by Antaira Model LNP- 1002 -GN including the Fiber GBIC modules for Fiber Optics Backbone Communication to Heritage Park Parking Garage. r • 5.6 Gbps Back -Plane (Switching Fabric) • Supports Port Based VLAN and IEEE802.1Q Tag VLAN • IEEE802.1p Class of Service Support • Quality of Service Supports Port Based, Tag Based, and IPv4 Type of Service • Xtreme Ring Redundancy Function ( <20 ms Recovery Time) • Supports Rapid Spanning Tree /Spanning Tree • Supports IGMP v1 and Query Mode. Up to 256 Groups. • SNMP, Web Management, RMON • System Event Log • Management IP Security • Power Redundancy • Easy Configuration Design • DIN -Rail and Wall Mount Design o (1) 12 Strand Fiber optics underground rated cabling will be provided And installed for communication back to the Head end room for the Heritage Park Parking Garage: o (1) Pre Cast concrete pole 35' height for mounting of camera at the designated location per the City provided drawings. Safewasw SAFETY-SERVICE-RESPONSE cw.K�w roLS :�zocr� -r nsrwu. Bill of Materials for Zone 4: r *930! The Safeware Team Walking Path and In /Out- Under highway revised 6/27/14 CAMERAS So6warl® SAFETY-SERVICE-RESPONSE 1 N U MANUFACTU Q TOT MODEL o Description M RER T AL THE THE e SAFEWARE SAFEWARE 4 4 SITE HANDHOLE(Installed) -Z04 a TEAM TEAM THE THE e SAFEWARE SAFEWARE 1 ELECTRICAL SERVICE AT LOCATION- Z04 a TEAM TEAM 1 THE THE E SAFEWARE SAFEWARE 1 1 A Conduit Infrastructure -Z04 TEAM TEAM THE THE E CONCRETE pole, installation, and lightning rod- SAFEWARE SAFEWARE 1 1 A Z04 TEAM TEAM THE THE E SAFEWARE SAFEWARE 1 1 A TRENCHING ELECTRICAL- not to exceed Z04 TEAM TEAM 5MP DAY /NIGHT CAMERA- OUTDOOR- LONG E AXIS P3367 -VE 2 2 RANGE -Z04 A 3MP DAY/NIGHT CAMERA- OUTDOOR -Z04 A AXIS P3346 -VE 2 2 MOUNTING HARDWARE FOR AXIS CAMERA- Z04 A AXIS PMT 4 4 10 port High Temp field mounted POE switch E 10 /100 8, 2 10 /100 /1000 ports- Z04 A ANTARIA LNP- 1002 -GN 1 1 D401NC Power supply for POE switch -Z04 A ANTARIA 1 1 SPF GBIC MODULE for field switch req. for multi E ANTARIA SNP -M 2 2 mode -ZO4 A Fiber Optics LIU Connector Housing for field E CORNING LIU 1 1 mount- Z04 A VMS NEMA ENCLOSURE PACKAGE(Includes: All E Custom Custom 1 1 necessary Mounting Brackets)- Z04 A E VMS 314001 4 4 1- Channel of Net Video. - Z04 A THE THE FT 1 1 CABLING INFRASTRUCTURE- FIBER OPTICS -Z04 SAFEWARE SAFEWARE S�ewar�® ceceTV.ccov�rc.occonucF ^TEAM — _ TEAM THE THE 2 H LABOR INSTALLATION, DEVICE MOUNTING, SAFEWARE SAFEWARE 3 238 R PROGRAMMING AND SETUP- Z04 TEAM TEAM 8 THE THE E SAFEWARE SAFEWARE 8 8 A AS BUILTS DRAWINGS AND ENGINEERING- Z04 TEAM TEAM THE THE E 1 SAFEWARE SAFEWARE 19 A 9 PROJECT MANAGEMENT -Z04 TEAM TEAM THE THE E SAFEWARE SAFEWARE 1 1 A MISCELLANEOUS COST - CONNECTORS, Boxes -Z04 TEAM TEAM TOTAL COST OF PROJECT $36,490.55 SAFETY• SERVICE- RESPONSE Zone #5- Basketball Court: The Safeware Team will supply and install the following equipment: • (2) Fixed IP Dome cameras manufactured by Axis Communications an industry leader in the IP surveillance marketplace. The model number chosen for the coverage are the IP 66 Rated Axis P3367 -VE with its high 5MP resolution. Cameras will be installed on the new concrete pole that will be installed by The Safeware Team AXIS P3,367 -VE Network Camera Superb 5 megapixel, light- sensitive outdoor foxed dome with remofe focus;and zoom • Superb video in 5MP or HDTV 1080p quality • P -Iris control • Multiple H.264 streams and Motion ]PEG video streams • Easy installation with remote focus and zoom • Outdoor - ready, IP66 and NEMA 4X rating o (1) 12 Strand Fiber optics underground rated cabling will be provided And installed for communication back to the Head end room for the Heritage Park Parking Garage: • (1) NEMA Small form factor Enclosure with termination equipment for Active equipment requirements for communication to recorder located at public works. Will be installed at the Pole location. Safewatw SAFETY•SERVICE•RESPONSE • (4) High Temperature Media Converters for Transmission via fiber back to Public Works trailer connected to Ethernet switch. (�I o (1) Pre Cast concrete pole 35' height for mounting of camera at the designated location per the City provided drawings. GA.'Vi£RA PoL£ MOLD \T D£'I'AD.. Bill of Materials for Zone 5 Basketball Courts: Ni"L W The Safeware Team Basketball Court- Revised 6/27/14 Field Cameras Sa&wasv� SAFETY•SERVICE•RESPONSE N U MANUFACTU Q TOT MODEL o Description M RER T AL THE THE ea SAFEWARE SAFEWARE 2 2 SITE HANDHOLE(Installed) -Z05 TEAM TEAM THE THE ea SAFEWARE SAFEWARE 1 ELECTRICAL SERVICE AT LOCATION- ZO5 TEAM TEAM 1 THE THE E SAFEWARE SAFEWARE 1 1 A Conduit Infrastructure -ZO5 TEAM TEAM THE THE E CONCRETE pole, installation, lightning rod, and SAFEWARE SAFEWARE 1 1 A delivery-ZOS TEAM TEAM THE THE E SAFEWARE SAFEWARE 1 1 A Wind load Certification -ZO5 TEAM TEAM THE THE E SAFEWARE SAFEWARE 1 1 A TRENCHING ELECTRICAL- Not to exceed Z05 TEAM TEAM 5MP DAY /NIGHT CAMERA- OUTDOOR- LONG E AXIS P3367 -VE 2 2 RANGE- Z05 A MOUNTING HARDWARE FOR AXIS CAMERA -ZO5 A AXIS PMT 2 2 10 /100 H Media Converters for Ethernet -Z05 A M.Conv 4 4 P Fiber Optics LIU Connector Housing for field E CORNING LIU 1 1 mount -Z05 A VMS NEMA ENCLOSURE PACKAGE(Includes: All E CUSTOM CUSTOM 1 1 necessary Mounting Brackets) -Z05 A E VMS 314001 2 2 1- Channel of Net Video. -Z05 A THE THE FT SAFEWARE SAFEWARE 1 1 CABLING INFRASTRUCTURE- FIBER OPTICS -Z05 TEAM TEAM LABOR INSTALLATION, DEVICE MOUNTING, H THE THE 1 188 Sdreware \ SAFETY•SERVICE•RESPONSE PROGRAMMING AND SETUP -Z05 R I SAFEWARE SAFEWARE 8 TEAM TEAM 8 THE THE E SAFEWARE SAFEWARE 3 3 A AS BUILTS DRAWINGS AND ENGINEERING -Z05 TEAM TEAM THE THE E 1 SAFEWARE SAFEWARE 16 A 6 PROJECT MANAGEMENT -Z05 TEAM TEAM THE THE E SAFEWARE SAFEWARE 1 1 A MISCELLANEOUS COST - CONNECTORS, Boxes -Z05 TEAM TEAM TOTAL COST OF PROJECT $28,623.87 Safewasw SAFETY-SERVICE-RESPONSE Zone #6- Public Works: The Safeware Team will supply and install the following equipment: • (6) Fixed IP Dome cameras manufactured by Axis Communications an industry leader in the IP surveillance marketplace. The model number chosen for the coverage are the IP 66 Rated Axis P3367 -VE with its high 5MP resolution. Cameras will be installed on based on the plan locations via new conduit system to be installed by The Safeware Team. AXIS P3367 -VE Network Camera Superb 5 megapixel', light - sensitive outdoor fixed dome with remote' focus slid zoom o� `moo Superb video in 5MP or HDTV 1080p quality c P -Iris control Multiple H.264 streams and Motion ]PEG video streams c Easy installation with remote focus and zoom Outdoor- ready, IP66 and NEMA 4X rating • (2) Fixed IP Dome cameras manufactured by Axis Communications an industry leader in the IP surveillance marketplace. The model number chosen for the coverage are the IP 66 Rated Axis P3346 -VE with its 31VIP resolution. Cameras will be installed inside the Public works trailer per the design criteria provided. AXIS P3346 -VF Network Camera Superb HDTV 1080p vandal= resistant fixed dome with remote focus andzoom for outdoor use 3 Fit, • Superb video quality in HDTV 1080p or 3MP • WDR- dynamic capture and Light finder technology • H.264 main profile and multiple H.264 streams • Remote focus and zoom • Outdoor -ready and vandal- resistant design (1) Cisco Catalyst 2900 Series Gigabit Switch with Fiber GBIC Modules- installed within the Public works network equipment rack. • Enclosure Type: Rack - mountable - lU • Subtype: Gigabit Ethernet • Ports: 24 x 10 /100 /1000 + 4 x SFP • Performance: Switching capacity : 176 Gbps Forwarding performance (64 -byte packet size) : 41.7 Mpps • MAC Address Table Size: 8K entries • Remote Management Protocol: SNMP 1, SNMP 2, RMON 1, RMON 2, RMON 3, RMON 9, Telnet, SNMP 3, SNMP 2c, HTTP, HTTPS, TFTP, SSH Safewasw SAFETY•SERVICE•RESPONSE o (1) 12 Strand Fiber optics underground rated cabling will be provided And installed for communication back to the Head end room for the Heritage Park Parking Garage: rCYlri Bill of Materials for Zone 6- Public Works. ZONE 6- Revised 6/27/14 The Safeware Team a Public works INTERSECTION CAMERAS N U MANUFACTU 4 TOT MODEL o Description M RER T AL THE THE e SAFEWARE SAFEWARE 6 6 SITE HANDHOLE(Installed) -Z06 a TEAM TEAM THE THE e SAFEWARE SAFEWARE 1 ELECTRICAL SERVICE AT LOCATION- Z06 a TEAM TEAM 1 THE THE E SAFEWARE SAFEWARE 1 1 A Conduit Infrastructure -Z06 TEAM TEAM THE THE E SAFEWARE SAFEWARE 1 1 A TRENCHING ELECTRICAL- not to exceed Z06 TEAM TEAM 5MP DAY/NIGHT CAMERA- OUTDOOR- LONG E AXIS P3367 -VE 6 6 RANGE -Z06 A 3MP DAY /NIGHT CAMERA- OUTDOOR -Z06 A AXIS P3346 -VE 2 2 MOUNTING HARDWARE FOR AXIS CAMERA -Z06 A AXIS PMT 6 6 10 port High Temp field mounted POE switch E ANTARIA LNP- 1002 -GN 1 1 10 /100 8, 2 10 /100 /1000 ports -Z06 A D401NC0 Power supply for POE switch -Z06 A ANTARIA 1 1 SPF GBIC MODULE for field switch req. for multi E ANTARIA SNP -M 2 2 Safewasw SAFFTY•SFRVICF.RFSPANSF mode -Z06 A - - -- -- - -- - - - - -- - - - -- - - - -- Fiber Optics LIU Connector Housing for field E CORNING LIU 1 1 mount -Z06 A VMS NEMA ENCLOSURE PACKAGE(Includes: All E CUSTOM CUSTOM 1 1 necessary Mounting Brackets)- large Form -Z06 A E 1- Channel of Net Video. -Z06 A VMS 314001 8 8 E WS- C2960S- CISCO SWITCH `" -Z06 Cisco 1 1 A 24T5 -L CISCO SWITCH WITH GBIC MODULES -Z06 A Cisco GBIC 4 4 THE THE FT SAFEWARE SAFEWARE 1 1 CABLING INFRASTRUCTURE- COPPER -Z06 TEAM TEAM THE THE FT SAFEWARE SAFEWARE 1 1 CABLING INFRASTRUCTURE- FIBER OPTICS TEAM TEAM THE THE 4 H LABOR INSTALLATION, DEVICE MOUNTING, SAFEWARE SAFEWARE 0 400 R PROGRAMMING AND SETUP -Z06 TEAM TEAM 0 THE THE E 1 SAFEWARE SAFEWARE 15 A S AS BUILTS DRAWINGS AND ENGINEERING -Z06 TEAM TEAM THE THE E 4 SAFEWARE SAFEWARE 42 A 2 PROJECT MANAGEMENT -Z06 TEAM TEAM THE THE E SAFEWARE SAFEWARE 1 1 A MISCELLANEOUS COST- CONNECTORS, Boxes -Z06 TEAM TEAM TOTAL COST OF PROJECT $69,387.47 SAFETY - SERVICE- RESPONSE Zone #7- PCP: The Safeware Team will supply and install the following equipment: • (20) Fixed IP Dome cameras manufactured by Axis Communications an industry leader in the IP surveillance marketplace. The model number chosen for the coverage are the IP 66 Rated Axis P3367 -VE with its high 5MP resolution. Cameras will be installed on based on the plan locations via new conduit system to be installed by The Safeware Team. AXIS P3367 -VE Network Camera Superb 5 megapixel', light- sensitive outdoor fixed dome with remote focus,tthd zoom • Superb video in SMP or HDTV 1080p quality • P -Iris control • Multiple H.264 streams and Motion ]PEG video streams • Easy installation with remote focus and zoom • Outdoor - ready, IP66 and NEMA 4X rating • (19) Fixed IP Dome cameras manufactured by Axis Communications an industry leader in the IP surveillance marketplace. The model number chosen for the coverage are the IP 66 Rated Axis P3346 -VE with its high 31VIP resolution. Cameras will be installed on based on the plan locations via new conduit system to be installed by The Safeware Team. AXIS P3346 -VE Network Camera Superb HDTV 1080p vandal= ! resistant fixed dome, with remote focus and.zobm for outdoor use • Superb video quality in HDTV 1080p or 3MP • WDR- dynamic capture and Light finder technology • H.264 main profile and multiple H.264 streams • Remote focus and zoom • Outdoor -ready and vandal- resistant design (5) Cisco Catalyst 2900 Series Gigabit Switch with Fiber GBIC Modules • Enclosure Type: Rack - mountable - 1U • Subtype: Gigabit Ethernet • Ports: 24 x 10 /100 /1000 + 4 x SFP • Performance: Switching capacity : 176 Gbps Forwarding performance (64 -byte packet size) : 41.7 Mpps • MAC Address Table Size: SK entries • Remote Management Protocol: SNMP 1, SNMP 2, RMON 1, RMON 2, RMON 3, RMON 9, Telnet, SNMP 3, SNMP 2c, HTTP, HTTPS, TFTP, SSH �4171lCe.�.. *305 "W �® SAFETY•SERVICE•RESPONSE (1) Custom Configuration recording Storage Server by Dell. Featuring embedded hypervisors, large memory capacity with 18 DIMM slots and 4 integrated network connections, Dell Power Edge delivers better overall system performance and greater virtual machine - per -server capacity. The Solution for PCP has been configured for recording to be stored for 15 days based on Motion detection of the cameras at 15 Frames per second (FPS) of recording. Backhaul equipment: For Backhaul transmission The Safeware Team will supply and install equipment manufactured by Cambium Networks which will create a stable and proven wireless environment for communication back to the Police Department. QOS will be utilized for Public Wi -Fi access Cambium Networks" Connecting the UmmnnectedTM Public Wi -Fi: dvm� 4066M ® SAFETY•SERVICE•RESPONSE 1 EnGen e io us Business Class High Power Wireless The Safeware Team will supply and install (4) Public Wi -Fi Access points that will enable high speed connections and multiple concurrent users to give access to users at PCP Park. The Safeware Team has chosen EnGenious Access points which are proven in the Wi -Fi industry for the applications required by the City of City of Sunny Isles Beach. Bill of Materials for Zone 7- PCP. The Safeware Team PCP- Revised 6/27/14 INTERSECTION CAMERAS TO U MANUFAC 0 N MODEL TA M TURER T o Description L THE THE e SAFEWARE SAFEWARE 6 6 SITE HANDHOLE(Installed) -Z07 a TEAM TEAM THE THE e SAFEWARE SAFEWARE 1 ELECTRICAL SERVICE AT LOCATION -Z07 a TEAM TEAM 1 THE THE E SAFEWARE SAFEWARE 1 1 A Conduit Infrastructure -Z07 TEAM TEAM THE THE E SAFEWARE SAFEWARE 1 1 A TRENCHING ELECTRICAL- not to exceed Z07 TEAM TEAM Rugged Switches, Radios, Backhaul Antennas, Surge E Cambium, Cambium, Suppression, Surge Arrestors, Site asses.- Public Wi -Fi (4)- 1 1 A mult mult Z07 Labor Installation for standard poles, roof and towers. THE THE E Includes brackets, straps, engineering, and wind load SAFEWARE SAFEWARE 1 1 A analysis, alignment and setup -Z07 TEAM TEAM 5MP DAY /NIGHT CAMERA- OUTDOOR- LONG RANGE -Z07 A AXIS P3367 -VE 20 20 3MP DAY /NIGHT CAMERA- OUTDOOR -Z07 AXIS P3346 -VE 19 19 A \ ,AFLTY0 = KVIGt•KL*1'U bb MOUNTING HARDWARE FOR AXIS CAMERA -Z07 A AXIS PMT 39 39 10 port High Temp field mounted POE switch 10 /100 8, 2 E LNP -1002- 10 /100 /1000 ports -Z07 A ANTARIA GN 4 4 Power supply for POE switch -Z07 E ANTARIA DRP -240- 4 4 A 40INC SPF GBIC MODULE for field switch req. for multi mode- E ANTARIA SNP -M 8 I 8 Z07 A Fiber Optics LIU Connector Housing for field mount -Z07 EA CORNING LIU 1 1 VMS NEMA ENCLOSURE PACKAGE(Includes: All necessary E Mounting Brackets) -Z07 A Custom Custom 2 2 E VMS 314001 39 39 1- Channel of Net Video. -Z07 A CONFIG. SERVER FOR RACK MOUNT APPLICATIONS- UP E VMS 90477 1 1 TO 63 CHANNELS- 40 TB CONFIG. -Z07 A E NITEK IPP -TR12 4 4 12 PORT SURGE SUPPRESION DEVICE -Z07 A WS- CISCO SWITCH ** -Z07 A Cisco C2960S- 5 5 24TS -L CISCO SWITCH WITH GBIC MODULES -ZO7 A Cisco GBIC 15 15 E 17" slide KVM W /17" LCD MONITOR -Z07 Tripplitte 1 1 A tray THE THE F SAFEWARE SAFEWARE 1 1 T CABLING INFRASTRUCTURE- COPPER -Z07 TEAM TEAM THE THE F SAFEWARE SAFEWARE 1 1 T CABLING INFRASTRUCTURE- FIBER OPTICS -Z07 TEAM TEAM THE THE H 13 13 LABOR INSTALLATION, DEVICE MOUNTING, SAFEWARE SAFEWARE R 87 87 PROGRAMMING AND SETUP -Z07 TEAM TEAM E 42 42 AS BUILTS DRAWINGS AND ENGINEERING -Z07 A E 15 15 PROJECT MANAGEMENT A 2 2 E 1 1 MISCELLANEOUS COST - CONNECTORS, Boxes -Z07 A TOTAL COST OF PROJECT $216,990.40 Zone #8- Gwen Margolis Park: 405MV SAFETY-SERVICE- RESPONSE The Safeware Team will supply and install the following equipment: - (10) Fixed IP Dome cameras manufactured by Axis Communications an industry leader in the IP surveillance marketplace. The model number chosen for the coverage are the IP 66 Rated Axis P3367 -VE with its high 5MP resolution. Cameras will be installed according to the design criteria of locations on the plans. AXIS P3367 -VE Network Camera Superb 5 megapixel, light- f r sensitive outdoor fixed dome WT with remote focus,and zoom O O, • Superb video in SMP or HDTV 1080p quality • P -Iris control • Multiple H.264 streams and Motion JPEG video streams • Easy installation with remote focus and zoom • Outdoor - ready, IP66 and NEMA 4X rating - (1) NEMA Enclosure with termination equipment for Active equipment requirements for communication to City Hall. 77lC, _ Safewasw SAFETY•SERVICE•RESPONSE • (1) Ruggedized 10 Port High Temperature rated Switch by Antaira Model LNP- 1002 -GN including the Fiber GBIC modules for Communication to City Hall. • 5.6 Gbps Back -Plane (Switching Fabric) • Supports Port Based VLAN and IEEE802.1Q Tag VLAN • IEEE802.1p Class of Service Support • Quality of Service Supports Port Based, Tag Based, and IPv4 Type of Service • Xtreme Ring Redundancy Function (<20 ms Recovery Time) • Supports Rapid Spanning Tree /Spanning Tree • Supports IGMP v1 and Query Mode. Up to 256 Groups. • SNMP, Web Management, RMON • System Event Log • Management IP Security • Power Redundancy • Easy Configuration Design • DIN -Rail and Wall Mount Design o (1) Pre Cast concrete pole 50' height for mounting of camera at the designated location per the City provided drawings. Backhaul equipment: Safewasw SAFETY•SERVICE•RESPONSE Cw.1iERA POLE M 11 "nT For Backhaul transmission The Safeware Team will supply and install equipment manufactured by Cambium Networks which will create a stable and proven wireless environment for communication back to the Police Department. QOS will be utilized for Public Wi -Fi access GO Cambium Networks" Connecting the Unconnected'" EnGen 101 -1 us Business Class High Power Wireless 0llwm� 61M (R) SAFETY•SERVICE•RESPONSE The Safeware Team will supply and install (2) Public Wi -Fi Access points that will enable high speed connections and multiple concurrent users to give access to users at Gwen Margolis Park. The Safeware Team has chosen EnGenious Access points which are proven in the Wi -Fi industry for the applications required by the City of City of Sunny Isles Beach. (1) Custom Configuration recorder for field mounted high temperature utilization. ruggedized unit is equipped with 10 /100 /1000 NIC cards and is configured to record 15 days of recording at 15 FPS on Motion recording parameters. Bill of Materials for Zone 8 -Gwen Margolis Park. ZONE 8- Revised 6/27/14 The Safeware Team Gwen Margolis Park INTERSECTION CAMERAS U MANUFAC Q N MODEL TA M TURER T o Description L THE THE e SAFEWARE SAFEWARE 1 ELECTRICAL SERVICE AT LOCATION- Z08 a TEAM TEAM 1 THE THE E SAFEWARE SAFEWARE 1 1 Conduit Infrastructure -Z08 A TEAM TEAM THE THE CONCRETE pole, installation, and lightning rod -50' height - A SAFEWARE ARE SAF I 1 1 Z08 TEAM TEAM E THE THE 1 1 TRENCHING ELECTRICAL- not to exceed Z08 A SAFEWARE SAFEWARE .47lcCr.�._ C"AMf'SArrJfYA® *AMINE WIMl 6 SAFETY•SERVICE•RESPONSE TEAM TEAM Rugged Switches, Radios, Backhaul Antennas, Surge THE THE E Suppression, Surge Arrestors- Send and Receive- Public Wi- SAFEWARE SAFEWARE 1 1 A Fi -Z08 TEAM TEAM Labor Installation for standard poles, roof and towers. THE THE Includes brackets, straps, engineering, and wind load E SAFEWARE SAFEWARE 1 1 analysis, alignment and setup -Z08 A TEAM TEAM 5MP DAY /NIGHT CAMERA- OUTDOOR- LONG RANGE -Z08 AXIS P3367 -VE 1 10 AE 1 MOUNTING HARDWARE FOR AXIS CAMERA -Z08 AXIS PMT 10 AE 10 port High Temp field mounted POE switch 10 /100 8, 2 E LNP -1002- 10 /100 /1000 ports -ZO8 A ANTARIA GN 3 3 Power supply for POE switch -ZO8 E ANTARIA DRP -240- 4 4 A 40INC EA SPF GBIC MODULE for field switch req. for multi mode -Z08 ANTARIA SNP -M 8 8 EA Fiber Optics LIU Connector Housing for field mount -Z08 CORNING LIU 1 1 VMS NEMA ENCLOSURE PACKAGE(Includes: All necessary E CUSTOM CUSTOM 1 1 Mounting Brackets) -Z08 A A 314001 0 10 1- Channel of Net Video. -Z08 VMS CONFIG. SERVER FOR FIELD MOUNTED APPLICATIONS- UP E VMS 980109 1 1 TO 20 CHANNELS -ZO8 A THE THE F SAFEWARE SAFEWARE 1 1 T CABLING INFRASTRUCTURE- COPPER -Z08 TEAM TEAM THE THE F SAFEWARE SAFEWARE 1 1 T CABLING INFRASTRUCTURE- FIBER OPTICS -ZO8 TEAM TEAM THE THE 6 H LABOR INSTALLATION, DEVICE MOUNTING, SAFEWARE SAFEWARE 8 R 0 0 PROGRAMMING AND SETUP -Z08 TEAM TEAM 0 E 2 24 AS BUILTS DRAWINGS AND ENGINEERING -Z08 A 4 E 8 84 PROJECT MANAGEMENT -ZO8 A 4 E 1 1 MISCELLANEOUS COST - CONNECTORS, Boxes -ZO8 A TOTAL COST OF PROJECT $102,509.95 SAFETY•SERVICE•RESPONSE Zone #9 -Town Center Park: The Safeware Team will supply and install the following equipment: • (10) Fixed IP Dome cameras manufactured by Axis Communications an industry leader in the IP surveillance marketplace. The model number chosen for the coverage are the IF 66 Rated Axis P3367 -VE with its high SMP resolution. Cameras will be installed according to the plan locations. AXIS P3,367 -VE Network Camera Superb 5 megapixel, light sensitive outdoor fixed dome with remote focus,and zoom • Superb video in SMP or HDTV 1080p quality • P -Iris control • Multiple H.264 streams and Motion ]PEG video streams • Easy installation with remote focus and zoom • Outdoor - ready, IP66 and NEMA 4X rating 'O • (1) Pan Tilt Zoom camera manufactured Red illumination Technology. SAFETY•SERVICE•RESPONSE by Samsung. SNP- 6200RH with its adaptive Infra o Full HD(1080p) image 30fps streaming Built -in 20x (4.45 -89mm) optical zoom lens o Min. Illumination OLux (IR distance 100m) o H.264 /MJPEG dual codec 0 3600 Endless Pan, Tilt/ Zoom o WDR, UPnP supports o IP66, IK10 Grade o Video privacy management supports • (1) NEMA Enclosure with termination equipment for Active equipment requirements for communication to ruggedized recorder within NEMA enclosure. Safew6ow SAFETY•SERVICE•RESPONSE • (2) Ruggedized 10 Port High Temperature rated Switch by Antaira Model LNP- 1002 -GN including the GBIC modules Communication to City Hall. • 5.6 Gbps Back -Plane (Switching Fabric) • Supports Port Based VLAN and IEEE802.1Q Tag VLAN • IEEE802.1p Class of Service Support • Quality of Service Supports Port Based, Tag Based, and IPv4 Type of Service • Xtreme Ring Redundancy Function (<20 ms Recovery Time) • Supports Rapid Spanning Tree /Spanning Tree • Supports IGMP v1 and Query Mode. Up to 256 Groups. • SNMP, Web Management, RMON • System Event Log • Management IP Security • Power Redundancy • Easy Configuration Design • DIN -Rail and Wall Mount Design o (1) Pre Cast concrete pole 50' height for mounting of camera at the designated location per the City provided drawings. o (3) Pre Cast concrete pole 35' height for mounting of camera at the designated location per the City provided drawings. t41712s.,.. Safewasw SAFETY•SERVICE•RESPONSE CA.�RA POLE tiiOL'�T DETAII- Backhaul equipment and Bridge: For Backhaul transmission The Safeware Team will supply and install equipment manufactured by Cambium Networks which will create a stable and proven wireless environment for communication back to the Police Department. QOS will be utilized for Public Wi -Fi access 0 Cambium Networks" Connecting the UnconnectedTM EnGen e 0i I us Business Class High Power Wireless SAFETY•SERVICE•RESPONSE The Safeware Team will supply and install (4) Public Wi -Fi Access points that will enable high speed connections and multiple concurrent users to give access to users at Town Center Park. The Safeware Team has chosen EnGenious Access points which are proven in the Wi -Fi industry for the applications required by the City of City of Sunny Isles Beach. (2) Custom Configuration recorder for field mounted high temperature utilization. ruggedized unit is equipped with 10 /100 /1000 NIC cards and is configured to record 15 days of recording at 15 FPS on Motion recording parameters. ZONE 9- Revised 6/27/14 The Safeware Team Town Center Park INTERSECTION CAMERAS 4%kwaow SAFETY•SERVICE•RESPONSE 1 U MANUFAC Q N MODEL TA M TURER T o Description L THE THE e SAFEWARE SAFEWARE 1 ELECTRICAL SERVICE AT LOCATION- Z09 a TEAM TEAM 1 THE THE E SAFEWARE SAFEWARE 1 1 Conduit Infrastructure -Z09 A TEAM TEAM THE THE CONCRETE pole, installation, and lightning rod -35' height - A SAFEWARE SAFEWARE 3 3 Z09 TEAM TEAM THE THE E CONCRETE pole, installation, and lightning rod -50' height - SAFEWARE SAFEWARE 1 1 A Z09 TEAM TEAM THE THE E SAFEWARE SAFEWARE 1 1 A TRENCHING ELECTRICAL- not to exceed Z09 TEAM TEAM THE THE E SAFEWARE SAFEWARE 1 1 A Wireless bridge- Pier Park -Z09 TEAM TEAM THE THE E Rugged Switches, Radios, Backhaul Antennas, Surge SAFEWARE SAFEWARE 1 1 A Suppression, Surge Arrestors- Public Wi- Fi -Z09 TEAM TEAM Labor Installation for standard poles, roof and towers. THE THE E Includes brackets, straps, engineering, and wind load SAFEWARE SAFEWARE 2 2 A analysis -Z09 TEAM TEAM - Exterior PTZ SNP- 6200RH- SAMSUNG -Z09 A SAMSUNG 1 1 6200 POLE MOUNTING KIT- SBP- 300 PM- SAMSUNG -Z09 SAMSUNG 1 1 A 300PM 1 5MP DAY /NIGHT CAMERA- OUTDOOR- LONG RANGE -Z09 A AXIS P3367 -VE 10 1 MOUNTING HARDWARE FOR AXIS CAMERA -Z09 A AXIS PMT 10 10 port High Temp field mounted POE switch 10 /100 8, 2 E LNP -1002- 10 /100 /1000 ports -Z09 A ANTARIA GN 2 2 E DRP -240- Power supply for POE switch -Z09 ANTARIA 2 2 A 40INC SPF GBIC MODULE for field switch req. for multi mode -Z09 A ANTARIA SNP -M 4 4 Safewaviv SAFETY•SERV ICE•RESPANSE Fiber Optics LIU Connector Housing for field mount -Z09 A CORNING LIU 1 1 VMS NEMA ENCLOSURE PACKAGE(Includes: All necessary E CUSTOM CUSTOM 1 1 Mounting Brackets)- large Form -Z09 A 1- Channel of Net Video. -Z09 A VMS 314001 0 10 CONFIG. SERVER FOR FIELD MOUNTED APPLICATIONS- UP E VMS 980109 2 2 TO 20 CHANNELS A THE THE F SAFEWARE SAFEWARE 1 1 T CABLING INFRASTRUCTURE- COPPER -Z09 TEAM TEAM LABOR INSTALLATION, DEVICE MOUNTING, HAND THE THE 6 H DIGGNING IN NECESSARY AREAS PROGRAMMING AND SAFEWARE SAFEWARE 6 R 4 4 SETUP -Z09 TEAM TEAM 4 THE THE E 3 SAFEWARE SAFEWARE 30 A 0 AS BUILTS DRAWINGS AND ENGINEERING -Z09 TEAM TEAM THE THE 1 E 10 SAFEWARE SAFEWARE 0 A 5 5 PROJECT MANAGEMENT -Z09 TEAM TEAM 5 THE THE E SAFEWARE SAFEWARE 1 1 A MISCELLANEOUS COST - CONNECTORS, Boxes -Z09 TEAM TEAM TOTAL COST OF PROJECT $135,821.27 Safewavlw SAFETY•SERVICE•RESPONSE Zone #10- Pier Park: The Safeware Team will supply and install the following equipment: • (4) Fixed IP Dome cameras manufactured by Axis Communications an industry leader in the IP surveillance marketplace. The model number chosen for the coverage are the IP 66 Rated Axis P3364 -LVE. Due to the low lighting conditions we have utilized the IR model to maximize object detection capability. o 6t r, • Superb video in IMP or HDTV 720p quality • Multiple H.264 videos streams • Easy installation including remote zoom and focus • Built -in high- efficiency, long -life LED's for IR illumination • Outdoor -ready and vandal- resistant design SAFETY•SERVICE•RESPONSE • (1) Fixed IP Dome cameras manufactured by Axis Communications an industry leader in the IP surveillance marketplace. The model number chosen for the coverage are the IP 66 Rated Axis P3367 -VE with its high SMP resolution. Camera will be installed to look at vehicle gate entrance to beach. AXIS P3367 -VE �o Network Camera ` ° 1 Superb.5 megapixel, light - sensitive outdoor fi ced dome with remote focus:and zoom O O. sa, • Superb video in SMP or HDTV 1080p quality • P -Iris control • Multiple H.264 streams and Motion JPEG video streams • Easy installation with remote focus and zoom • Outdoor - ready, IP66 and NEMA 4X rating • (2) Pan Tilt Zoom camera manufactured by Samsung. SNP- 6200RH with its adaptive Infra Red illumination Technology. Safewaille SAFETY•SERVICE•RESPONSE 0 Full HD(1080p) image 30fps streaming Built -in 20x (4.45 -89mm) optical zoom lens 0 Min. Illumination OLux (IR distance 100m) 0 H.264 1MJPEG dual codec 0 3600 Endless Pan, Tilt/ Zoom 0 WDR, UPnP supports 0 IP66, IK1O Grade 0 Video privacy management supports • (3) Fixed IP Dome cameras manufactured by Axis Communications an industry leader in the IP surveillance marketplace. The model number chosen for the coverage are the IP 66 Rated Axis P3346 -VE with its high 3MP resolution. Cameras will be installed on based on the plan locations via new conduit system to be installed by The Safeware Team. AXIS P3346 -VE Network Camera Superb HDTV 10800 vandal- resistant fixed dome with remote focus and:zoom "for outdoor use • Superb video quality in HDTV 1080p or 3MP • WDR- dynamic capture and Light finder technology • H.264 main profile and multiple H.264 streams • Remote focus and zoom • Outdoor -ready and vandal- resistant design 05MV r+�® SAFETY•SERVICE•RESPONSE • (1) NEMA Enclosure with termination equipment for Active equipment requirements for communication to ruggedized recorder within NEMA enclosure. • (2) Ruggedized 10 Port High Temperature rated Switch by Antaira Model LNP- 1002 -GN including the GBIC modules Communication to Town Center Park via wireless Backhaul. CIL C - i: • 5.6 Gbps Back -Plane (Switching Fabric) • Supports Port Based VLAN and IEEE802.1Q Tag VLAN • IEEE802.1p Class of Service Support • Quality of Service Supports Port Based, Tag Based, and IPv4 Type of Service • Xtreme Ring Redundancy Function (<20 ms Recovery Time) • Supports Rapid Spanning Tree /Spanning Tree • Supports IGMP v1 and Query Mode. Up to 256 Groups. • SNMP, Web Management, RMON • System Event Log • Management IP Security • Power Redundancy • Easy Configuration Design • DIN -Rail and Wall Mount Design SafewasV SAFETY•SERVICE•RESPONSE o (2) Pre Cast concrete pole 35' height for mounting of camera at the designated location per the City provided drawings. Backhaul equipment and Bridge: CI..rIEILA TOLE MU D4T For Backhaul transmission The Safeware Team will supply and install equipment manufactured by Cambium Networks which will create a stable and proven wireless environment for communication back to the Police Department. QOS will be utilized for Public Wi -Fi access `® Cambium Networks" Connecting the Ummnnected" Safewww SAFETY•SERVICE•RESPONSE EnGenius Business Class High Power Wireless The Safeware Team will supply and install (1) Public Wi -Fi Access points that will enable high speed connections and multiple concurrent users to give access to users at Town Center Park. The Safeware Team has chosen EnGenious Access points which are proven in the Wi -Fi industry for the applications required by the City of City of Sunny Isles Beach. (1) Custom Configuration recorder for field mounted high temperature utilization. ruggedized unit is equipped with 10 /100 /1000 NIC cards and is configured to record 15 days of recording at 15 FPS on Motion recording parameters. IL Bill of Materials- Zone 10 ZONE 10- Rev. 7 -1 -14 ATCi Communications Pier Park INTERSECTION CAMERAS �fthwasw SAFETY•SERVICE•RESPONSE FE- N U MANUFA Q TO MODEL o Description M CTURER T TAIL e ATCI ATCI 5 5 SITE HANDHOLE(Installed) -Z10 a e ATCI ATCI 1 ELECTRICAL SERVICE AT LOCATION -Z10 a 1 E ATCI ATCI 1 1 Conduit Infrastructure -Z10 A CONCRETE pole, installation, and lightning rod -35' height - E ATCI ATCI 2 2 Z10 A E ATCI ATCI 1 1 TRENCHING ELECTRICAL- not to exceed Z10 A E ATCI ATCI 1 1 PAVER REMOVAL AND REINSTALLATION -Z10 A Rugged Switches, Radios, Backhaul Antennas, Surge E ATCI ATCI 1 1 Suppression, Surge Arrestors.- Public Wifi -Z10 A Labor Installation for standard poles, roof and towers. Includes brackets, straps, engineering, and wind load A ATCI ATCI 1 1 analysis -Z10 - Exterior PTZ SNP- 6200RH- SAMSUNG -Z10 A SAMSUNG 2 2 6200 POLE MOUNTING KIT- SBP- 300PM- SAMSUNG -Z10 SAMSUNG 2 2 A 300PM 5MP DAY /NIGHT CAMERA- OUTDOOR- LONG RANGE -Z07 A AXIS P3367 1 1 VE P 346 3MP DAY /NIGHT CAMERA- OUTDOOR -Z07 A AXIS 3 3 VE 720P DAY /NIGHT CAMERA- OUTDOOR with IR illumination- E P3364- AXIS 4 4 LOW LIGHT -Z10 A VE MOUNTING HARDWARE FOR AXIS CAMERA -Z10 A AXIS TBD 4 4 10 port High Temp field mounted POE switch 10 /100 8, 2 E LNP ANTARIA 1 1 10 /100 /1000 ports -Z10 A 1002 -GN D401NC0 Power supply for POE switch -Z10 A ANTARIA 1 1 SPF GBIC MODULE for field switch req. for multi mode -Z10 A ANTARIA SNP -M 2 2 Fiber Optics LIU Connector Housing for field mount -Z10 A CORNING LIU 1 1 VMS NEMA ENCLOSURE PACKAGE(Includes: All necessary E CUSTOM CUSTOM 2 2 �47rlCr.�.. \ SAFETY•SERVICE•RESPONSE Mounting Brackets) -Z10 A A 314001 0 10 1- Channel of Net Video. -Z10 VMS CONFIG. SERVER FOR FIELD MOUNTED APPLICATIONS- UP E VMS 980109 1 1 TO 20 CHANNELS -Z10 A F ATCI ATCI 1 1 CABLING INFRASTRUCTURE- COPPER -Z10 T F ATCI ATCI 1 I 1 CABLING INFRASTRUCTURE- FIBER OPTICS -Z10 T 4 H LABOR INSTALLATION, DEVICE MOUNTING, ATCI ATCI 3 430 R PROGRAMMING AND SETUP -Z10 0 ATCI ATCI 7 17 AS BUILTS DRAWINGS AND ENGINEERING -Z10 A A ATCI 3 63 PROJECT MANAGEMENT -Z10 ATCI E ATCI ATCI 1 1 MISCELLANEOUS COST - CONNECTORS, Boxes -Z10 A TOTAL COST OF PROJECT $87,491.55 SAFETY•SERVICE•RESPONSE Zone #11- City Hall/ HQ: HQ will be the hub for all live and playback video monitoring throughout the Citywide deployment proposed under this scope document, The Safeware Team will setup and provide the monitoring equipment and wireless receiving equipment to accomplish this requirement under this scope of work: The Following locations will be able to be monitored from HQ: • Zone #1- Heritage Park • Zone #2- Heritage Park Parking Garage • Zone #3- Golden Shores Park cameras • Zone #4- Parking In /Out Walking Path cameras • Zone #5- Basketball Court • Zone #6- Public Works • Zone #7 -PCP • Zone #8 -Gwen Margolis • Zone #9 -Town Center Park • Zone #10 -Pier Park Backhaul equipment: For Backhaul transmission The Safeware Team will supply and install equipment manufactured by Cambium Networks which will create a stable and proven wireless environment for communication back from all covered locations. QOS will be utilized for Public Wi -Fi access c® Cambium Networks" Connecting the UmmnnectedTM 4%hwasw SAFETY•SERVICE•RESPONSE Video Wall Monitors: (1) 21" LED Consumer grade monitor for live and playback viewing. Brand provided will be Samsung or comparable. (4) 46" LED Consumer grade Narrow bezel monitor for live and playback viewing. Brand provided will be Samsung or comparable. (1) Custom Configuration recording Storage Server by Dell. t 6 Featuring embedded hypervisors, large memory capacity with 18 DIMM slots and 4 integrated network connections, Dell Power Edge delivers better overall system performance and greater virtual machine - per -server capacity. The Solution for the Control Center has been configured for recording to be stored for 30 days based on Motion detection of the cameras at 15 Frames per second (FPS) of recording. (1) Cisco Catalyst 2900 Series Gigabit Switch with Fiber GBIC Modules- installed within the network equipment rack. SAFETY•SERVICE•RESPONSE • Enclosure Type: Rack - mountable - 1U • Subtype: Gigabit Ethernet • Ports: 24 x 10 /100 /1000 + 4 x SFP • Performance: Switching capacity : 176 Gbps Forwarding performance (64 -byte packet size) : 41.7 Mops • MAC Address Table Size: SK entries • Remote Management Protocol: SNMP 1, SNMP 2, RMON 1, RMON 2, RMON 3, RMON 9, Telnet, SNMP 3, SNMP 2c, HTTP, HTTPS, TFTP, SSH Video Management Software: The Safeware Team will provide install and program the video management platform manufactured by Indigo Vision. The software will be programmed and fully configured to the requirements of the City of City of Sunny Isles Beach. IndigoVision IG Vid" and Alarm Management Bill of Materials- Zone 11- Command Center ZONE 11 The Safeware Team 911 Command Center- Revised 6/27/14 INTERSECTION CAMERAS aumware SAFETY•SERVICE•RESPONSE 1 TO MANUF U Q ACTURE MODEL N M T T R o Description AL THE THE Rugged Switches, Radios, Backhaul Antennas, Surge Suppression, E SAFEWA SAFEWA Surge Arrestors- Bridge for Town Center Park, Margolis, PCP, A RE RE 4 4 Heritage Park PG and site analysis -Z11 TEAM TEAM THE THE E SAFEWA SAFEWA Labor Installation for standard poles, roof and towers. Includes A RE RE 4 4 brackets, straps, engineering, and wind load analysis -Z11 TEAM TEAM E Samsun 46" LED DISPLAY ** Consumer Grade -Z11 46" LED 4 4 A g CONFIG. SERVER FOR RACK MOUNT APPLICATIONS- WITH DAS E VMS 90478 1 1 FOR 30 DAYS STORAGE- Z02 A THE E SAFEWA 980109 1 1 A RE Config. Workstation- High Powered -Z11 TEAM E Samsun 22" LED DISPLAY ** CONSUMER Grade -Z11 24 "LED 1 1 A g THE E SAFEWA 46 "LED- 46" Wall Mount for Display CONSUMER Grade-Z11 4 4 A RE 60" TEAM WS- CISCO SWITCH ** -Z11 A Cisco C2960S- 1 1 24TS -L CISCO SWITCH WITH GBIC MODULES -Z11 A Cisco GBIC 2 2 JOYSTICK AXIS T8311 -Z11 A Axis T8311 1 1 F 1 1 CABLING INFRASTRUCTURE- COPPER -Z11 T F 6 6 CABLE PULL -Z11 T LABOR INSTALLATION, DEVICE MOUNTING, PROGRAMMING AND H 2 27 SETUP -Z11 R 7 7 \ SAFETY•SERVICE•RESPONSE 7 E 1 16 AS BUILTS DRAWINGS AND ENGINEERING -Zll A 6 E 5 PROJECT MANAGEMENT -Zll A 7 57 E MISCELLANEOUS COST - CONNECTORS, Boxes -Zll A 1 1 TOTAL COST OF PROJECT $88,686.02 SAFETY-SERVICE-RESPONSE Project Timelines: This project timeline will be 90 days for completion after NTP and will be followed by a closeout period for retainage, training, punch list, and project as buits. The Safeware Team will submit permit applications within 7 days after receipt of PO. Notice to proceed will be issued after approved submittal and issuance of project permits by the City of City of Sunny Isles Beach. =Work in Progress PROJECT: CITY OF SUNNY ISLES BEACH - CITYWIDE SURVEILLANCE- Subject to revision by City of Sunny Isles Beach THE SAFEWARE TEAM PREPARED BY: COMMUNICATIONS, INC. 30 Day TASK CLOSEOUT TASK BY CITY OF CITY OF 30 60 90 PUNCH,AS- PURCHA SUNNY ISLES BEACH & DA DA DA BUILTS. -SE PAYMENT OF - - - RETAINAGE, ORDER PERMITS MOBILIZATION YS YS YS TRAINING APPROVALBY ZONE 1- HERITAGE CITY OF SUNNY PARK x ISLES BEACH NTP 30 DAYS APPROVALBY ZONE 2- HERITAGE CITY OF SUNNY PARK PARKING ISLES BEACH GARAGE x NTP 30 DAYS APPROVALBY CITY OF SUNNY ZONE 3- GOLDEN ISLES BEACH SHORES PARK x NTP 30 DAYS APPROVALBY CITY OF SUNNY ZONE 4- UNDER ISLES BEACH HIGHWAY x NTP 30 DAYS APPROVALBY ZONE 5- CITY OF SUNNY BASKETBALL ISLES BEACH COURT x NTP 30 DAYS ZONE 6- PUBLIC APPROVALBY WORKS x CITY OF SUNNY NTP 30 DAYS Safewasw CA CCTV. CC QV 1 PC. QC C Dn u CC PLEASE REFFER TO ADDENDUM "A" PROJECT DRAWINGS PREPARED BY CITY OF SUNNY ISLES BEACH CONSULTANT FOR EQUIPMENT INSTALLATION LOCATIONS AND INTENDED FIELD OF VIEWS. PAYMENT SCHEDULE: PROGRESS BILLINGS ON MONTHLY PERIODS BASED ON PROJECT PROGRESS AND DELIVERY OF EQUIPMENT PER THE BELOW: 10% MOBILIZATION UPON ISSUANCE OF PURCHASE ORDER 40% UPON DELIVERY OF EQUIPMENT. 15% PROGRESS PAYMENT AT 30 DAYS OF PROJECT. 15% PROGRESS PAYMENT AT 60 DAYS OF PROJECT. 10% PROGRESS PAYMENT AT 90 DAYS OF PROJECT. 10 %AFTER RETAINAGE PERIOD. ISLES BEACH ^• APPROVALBY CITY OF SUNNY ISLES BEACH ZONE 7- PCP X NTP 30 DAYS APPROVALBY CITY OF SUNNY ZONE 8 -GWEN ISLES BEACH MARGOLIS PARK X NTP 30 DAYS APPROVALBY CITY OF SUNNY ZONE 9- TOWN ISLES BEACH CENTER PARK X NTP 30 DAYS APPROVALBY CITY OF SUNNY ZONE 10- PEIR ISLES BEACH PARK X NTP 30 DAYS APPROVALBY CITY OF SUNNY ZONE 11- ISLES BEACH CONTROL ROOM X NTP 30 DAYS PLEASE REFFER TO ADDENDUM "A" PROJECT DRAWINGS PREPARED BY CITY OF SUNNY ISLES BEACH CONSULTANT FOR EQUIPMENT INSTALLATION LOCATIONS AND INTENDED FIELD OF VIEWS. PAYMENT SCHEDULE: PROGRESS BILLINGS ON MONTHLY PERIODS BASED ON PROJECT PROGRESS AND DELIVERY OF EQUIPMENT PER THE BELOW: 10% MOBILIZATION UPON ISSUANCE OF PURCHASE ORDER 40% UPON DELIVERY OF EQUIPMENT. 15% PROGRESS PAYMENT AT 30 DAYS OF PROJECT. 15% PROGRESS PAYMENT AT 60 DAYS OF PROJECT. 10% PROGRESS PAYMENT AT 90 DAYS OF PROJECT. 10 %AFTER RETAINAGE PERIOD. FINANCIAL SUMMARY: INVESTMENT TOTAL: $1,033,946.49 *%&wasw SAFETY•SERVICE•RESPONSE APPLICABLE PERMIT FEES TO BE BILLED AT COST: $17,800.00 ESTIMATED COST. BONDING FEE AT 2.5 %: $26,117.90 CONTINGENCY FEES: $79,835.00 ** * *Project contingency is set aside for mutually agreeable unforeseen issues that would entail additional labor and or material to be approved by City of Sunny Isles Beach and The Safeware Team. Personnel: Staffing: �i�rf war+�® SAFETY-SERVICE-RESPONSE The Safeware Team Communications has invested in specific departments which allow us to provide the best available Service to our clients. The Company maximizes efficiencies by having staff: Project Managers who oversee each project. In house engineering. • Auto -cad. • Client design/Development. • Installation Technicians. • IT Technicians. • Service Technicians. • Scheduling Staff. Accounting Staff. Purchasing staff. The Safeware Team's Proposed Personnel Name Position Marcus Moreno Contract Manager Timothy J. Moreno Contract Manager Holly S. Livingston VP of Operations Nick Duarte Administrative Manager Frank Rodriguez Field Operations Manager Blair Rodgers Sr. Project Manager Ed Heinemann Senior Systems Engineer Diego Guerrero Design Engineer Adolfo Gonzalez Design- AutoCAD Nancy Martin Service Coordinator Inti Alejo IT Engineer Jorge Pla IT Engineer Michael Del Moral Lead Technician Enrique Petit Lead Technician Barry Pierre Lead Technician Felix Camacho Field Technician Gary Nieto Field Technician Barry Pierre Senior Service Technician John Fields Senior Service Technician Jaime M. Daniel Jr. Service Technician Rafael Jimenez Service Technician All Personnel can be reached at 305- 620 -0062 Proposed Methodology. awmwam SAFETY•SERVICE•RESPONSE The Safeware Team organizes its projects much like a General Contractor assigning a Project Manager and a team of qualified individuals to streamline the process for meeting milestones and completing the tasks within a scheduled timeframe. The work required is integrated into a logical process as demonstrated in the following task oriented illustrations. All of the program steps are not required for a project but are included to assure completion of all necessary details. The pages shown, under each general heading, illustrate an item to be evaluated or performed under the main task heading. Phase II - Design and Engine je ingL,,, fy PREPARE CONCEPTUAL DESIGN -• EVALUATE NARDWARE81 .� PREPARE DETAILED DESIGN SOFTWARE ALTERNATIVES- Phase III - Project Management, Supervision and Co� - et on BIDEVALUATION - CONSTRUCTION PERFORMANCE TESTING DOCUMENTATION SELECTION S SELECTION SUPERVISION ' 40Aplm� 59M ® SAFETY-SERVICE-RESPONSE Our project managers ensure that whether work is performed directly by The Safeware Team personnel or by long time trusted subcontractors to The Safeware Team, all work is performed in a professional manner to meet code and critical time lines and scheduling requirements. All projects, whether large or small, are scheduled, and the project manager supported, by the Project Management Office (PMO) in the corporate headquarters, The Pre - Functional Checklists and Functional Performance Testing guaranty performance certification as well as the follow up development of a list of warranty issues at the 10 -month milestone as an example. The Safeware Team performs all engineering functions in house and has developed cooperative associations with factory engineering and support personnel of all major product lines. This assures that the latest upgrades are included and integrated in the installed systems. All AutoCAD is in house. Project Coordination and Communication The Safeware Team has a lineage with expertise in security and technology that goes back three decades. The Safeware Team is structured much like a General contracting firm. The Company maximizes efficiencies by having staff Project Managers who oversee each project utilizing The Safeware Team's in house, engineering, auto -cad, technical, scheduling, accounting and purchasing staff. The Safeware Team provides a single source for state -of- the -art technology at an affordable cost. The Company's mandate, as an industry leader, is the pursuit of excellence. The Safeware Team is also a unique systems integrator in our One - source model. Rather than paying multiple contractors for related but different services, The Safeware Team integrates — alarm, Internet, security (access, CCTV & intercoms), structured network cabling, wireless networks, gate systems, automation and ID badging into one contract. This approach would offer the City of Sunny Isles Beach greatly enhanced value and convenience. The Safeware Team becomes "one source' rather than many separate contacts and the problems that go along with managing them. Service Coordination and Communication *%&waoW SAFETY•SERVICE•RESPONSE The Safeware Team organizes its projects much like a General Contractor assigning a Project Manager and a team of qualified individuals to streamline the process for meeting milestones and completing the tasks within a scheduled timeframe. The work required is integrated into a logical process as demonstrated in the following task oriented illustrations. All of the program steps are not required for a project but are included to assure completion of all necessary details. The Safeware Team strongly supports the preventive maintenance approach to extending the operating life of equipment. Many unscheduled interruptions in the critical operation of systems can be averted by the periodic inspection and adjustments by qualified technicians. Programs can be contracted to provide monthly, semi - annual, annual and combinations of inspections. Software upgrades can also be accomplished at these scheduled inspections. The Safeware Team has a full time service department and does not sub out any service work. Requests for maintenance or service are logged by the service /help desk on the "Service Request Form" and assigned to the technical service personnel trained on the system to be serviced. A scheduled time for service to be rendered is given to the requestor. A "Work Order" is given to the service personnel and a copy is given to the client listing the corrective action taken and parts required. Any loaner supplied is listed as well as any parts that have to be ordered and serves as follow up for receipt and installation of a replacement part. The Safeware Team maintains the Miami -Dade Public Schools' systems and is required to use their "Maintenance Service Ticket" for service. A copy is attached for the record. The Safeware Team also utilizes an Access Database relation to inventory control when dealing with Government contracts such as our shared database with our Miami Dade County Public Schools Maintenance Contract. The Safeware Team has established performance measures to ensure quality of service for our clients. As a part of our service department's standard operating procedures, The Safeware Team's clients are contacted to check the present operation of the system and to verify their satisfaction with the service. This procedure is performed at the close of each work week. Comments are entered at the bottom of the Service Request Form. This contact also provides the opportunity to suggest any upgrades or additions that may have been apparent during the service call. Other Relevant Service Accounts .warms® SAFETY•SERVICE•RESPONSE The Safeware Team has the ability to provide service 240 365 days out of the year. We hold several government contracts that require The Safeware Team to provide service within a fixed number of hours from the time the call is placed. All of these requirements were established by creating a list of needs that the end user felt would be appropriate based on their business practices. Some examples of the service parameters which we have are described below based on current contracts held by The Safeware Team: Port of Miami- 24x7 service including 365 days per year. Response time for the Port is 4 hours form time of the call. Miami Dade County Public Schools: 247 service including 365 days per year. Response time for tickets issued is 24 hour response with exception of emergency tickets, in which The Safeware Team responds within a 3 hour window. > City of Hollywood- 24x7 service including 365 days per year. Response time for tickets issued is 3 hours from time of call. Miami Dade County ISD- 247 service including 365 days per year. Response time for tickets issued is 8 hours from time of call. Other / Value Added Services. : wasw SAFETY•SERVICE•RESPONSE The Safeware Team, as a single entity, is committed to providing a single source for state -of- the -art security and wireless technologies, for the City of Sunny Isles Beach at an affordable cost. The scope of services provided by The Safeware Team's project management and engineering associates is all inclusive of the full spectrum of technology needs of this project. The services offered do not end at the installation completion but continue with follow up maintenance and upgrades as they are available. Training of new operators is always listed as a priority. The Safeware Team is proficient and knowledgeable in Technology Systems Security, Voice, Video, and Data, including and not limited to: SECURITY TECHNOLOGY; • HI DEFINITION VIDEO SURVEILANCE • VIDEO ANALYTICS • WIRELESS VIDEO SYSTEMS • ENTERPRISE ACCESS SYSTEMS • RADIO FREQUENCY IDENTIFICATION • PERIMETER SYSTEMS VOICE AND DATA; • STRUCTURED CABLING • FIBER OBTIC NETWORKS • WIRELESS MESH NETWORKS • VOICE OVER IP • IF OR ANALOG INTERCOM SOLUTIONS CUSTOM VEHICLE GATES: • BARRIER ARM GATES. • SWING GATES. • SLIDE GATES. • TILT -UP GATES. " o. S.- '- TO: VIA: FROM DATE: City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, Florida 33160 (305) 947 -0606 City Hall (305) 949 -3113 Fax MEMORANDUM The Honorable Mayor and City Commission Christopher J. Russo, City Manager Fred A. Maas, Chief of Police Michael A. Grandinetti, Police Captain 7/17/2014 RE: Approval to enter into an agreement with Safeware, Inc. to install and maintain, Phase I of a Citywide Security Closed Circuit Television (CCTV) System, in an amount not to exceed $1,237,755.80 RECOMMENDATION: It is recommended that the City Commission adopt the attached resolution authorizing the Mayor to enter into an agreement with Safeware, Inc. to install and maintain, phase I of a Citywide Security Closed Circuit Television (CCTV) System. REASONS: The installation of a Citywide Security Closed Circuit Television (CCTV) System would provide the police department with 24 hour / 7 days a week surveillance of ten (10) parks and locations throughout the city, in addition to the invaluable archival data of up to thirty (30) days for investigative purposes. ADDITIONAL INFORMATION: The City of Sunny Isles Beach Police and Information Technology Departments have worked closely with a city contracted security consultant to design an optimal security layout plan for each location. In addition to the proposed contracted price and vendor contingency of $79,835.00, the city has added an additional contingency amount of $81,611.41 (for a total of 15% contingency) for any unforeseen additions not listed in the proposed scope of work. Aeenda Item No. 10D Date 7117/2014 304 This procurement would be through the US Communities Government Contract Titled: "Homeland Security & Public Safety /Emergency Preparedness" Contract # 4400001839 FUNDING SOURCE: DOJ Federal Forfeiture Fund # 60- 521 -5605 ATTACHMENTS: • Resolution • Agreement • Complete Proposal -SOW Aeenda Item No. IOD Date 7I17Q014 305