Loading...
HomeMy WebLinkAboutLynx Construction ManagementCITY OF SUNNY ISLES GOV CENTER 01 -Oct-1 L N CONSTRUCTION MANAGEMENT o Actual Level of Effort Remaining Work ♦ ♦ Milestone Actual Work Critical Remaining Work Tmm�I summary Page 1 of 1 ASK filter: All Activities © Oracle Start Finish Oct Nov Dec Jan Feb mai • • • • �' r • ® I' 23- a -1° cG Administration 0% 01- Oct -14 13- Nov -14 13- Nov -14, Administration No Area 32 32 0% 01- Oct -14 13- Nov -14 13- Nov -14, No Area o A1000 Contract Award 0 0 0% 01- Oct -14 Contract Award, 01- Oct -14 G@ A1010 Notice to Proceed 2 2 0% 01- Oct -14 02- Oct -14 Notice to Proceed o A1015 Purchasing & Buyout 10 10 0% 03- Oct -14 16- Oct -14 Purchasing & Buyout p A1020 Arch & Eng Generator Drawings 30 30 0% 03- Oct -14 13- Nov -14 Arch & Eng Generator Drawings © A1022 S.S. Rail Design Drawings 20 20 0% 03- Oct -14 30- Oct -14 IIIIIIIII S.S. Rail Design Drawings ® A1024 Plumbing Drainage Drawings 10 10 0% 03- Oct -14 16- Oct -14 ® Plumbing Drainage Drawings o A1025 Generator Submittal 10 10 0% 10- Oct -14 23- Oct -14 1 Generator Submittal © A1030 Exhaust Fan Submittal 10 10 0% 17- Oct -14 30- Oct -14 = Exhaust Fan Submittal G@ A2050 Geotechnical & Soil Report 10 10 0% 01- Oct -14 14- Oct -14 Geotechnical & Soil Report o A2060 Fountain Tile Submittal 10 10 0% 01- Oct -14 14- Oct -14 Fountain Tile Submittal G@ A2070 Stucco Submittal 10 10 0% 01- Oct -14 14- Oct -14 nNEEMONIIEDm Stucco Submittal G@ A2080 Painting Submittal 10 10 0% 01- Oct -14 14- Oct -14 I Painting Submittal G@ A2100 Fire Sprinkler Submittal 10 10 0% 01- Oct -14 14- Oct -14 I Fire Sprinkler Submittal ® A2110 Door & Hardware Submittal 10 10 0% 01- Oct -14 14- Oct -14 Door & Hardware Submittal ® A2500 Generator Procurement 10 10 0% 24- Oct -14 06- Nov -14 Generator Procurement o A2600 Mobilize on Site 5 5 0% 10- Oct -14 16- Oct -14 Mobilize on Site 16- Feb Constrw Construction -15, w- Jan -15, Area A - Office Bldg q Area A -Office Bldq 66 66 0-/.'03-Oct-14 06- Jan -15 o A3000 Pressure Cleaning 10 10 0% 17- Oct -14 30- Oct -14 Pressure Cleaning o A3020 Stucco Work 10 10 0% 31- Oct -14 13- Nov -14 Stucco Work o A3040 Caulking & Waterproofing 15 15 0% 14- Nov -14 08- Dec -14 Caulking & Waterproofing o A3060 Painting 15 15 0% 09- Dec -14 29- Dec -14 Painting G@ A3080 Door Frame Repair 2 2 0% 03- Oct -14 06- Oct -14 I• Door Frame Repair G@ A3090 Door Repair 2 2 0% 07- Oct -14 08- Oct -14 ■ Door Repair Q@ A3100 Hardware Repair 2 2 0% 09- Oct -14 10- Oct -14 ■ Hardware Repair o A3105 Acoustical Wall Panel Repair 5 5 0% 17- Oct -14 23- Oct -14 Acoustical Wall Panel Repair Q@ A3110 Fountain Repair 35 35 0% 13- Oct -14 02- Dec -14 Fountain Repair o A3130 Sprinkler Head Replacements 5 5 0% 17- Oct -14 23- Oct -14 Sprinkler Head Replacements Q@ A3140 Security Camera Replacements 5 5 0% 17- Oct -14 23- Oct -14 Security Camera Replacements o A3150 Stair Railing Fabrication 30 30 0% 03- Nov -14 16- Dec -14 Stair Railing Fabrication o A3155 Stair Railing Installation 10 10 0% 17- Dec -14 30- Dec -14 Stair Railing Installation o A3165 Final Cleaning 5 5 0% 31- Dec -14 06- Jan -15 _ . Final Cleaning 16- Feb Area B � Area B - Parkinq Garaqe 87 87 o 0% 15- Oct -14 16- Feb -15 -15, - o A2505 Generator Fabrication 45 45 0% 07- Nov -14 12- Jan -15 Generator Fabrication Q@ A2506 Removal of Existing Generator 5 5 0% 13- Jan -15 19- Jan -15 Removal of Existing Generator Q@ A2510 Generator Installation 10 10 0% 20- Jan -15 02- Feb -15 I Generator Installation Q@ A2520 Electrical Work 20 20 0% 30- Dec -14 26- Jan -15 Electrical Work Q@ A2530 Chiller Load Control 10 10 0% 27- Jan -15 09- Feb -15 Chiller Load Control o A2540 Mechanical - Exhaust Fans 20 20 0% 13- Jan -15 09- Feb -15 Mechanical - Exhaust Fans o A3010 Pressure Cleaning 10 10 0% 31- Oct -14 13- Nov -14 Pressure Cleaning Q@ A3030 Stucco Work 30 30 0% 14- Nov -14 29- Dec -14 Stucco Work o A3050 Caulking & Waterproofing 20 20 0% 16- Dec -14 12- Jan -15 Caulking & Waterproofing Q@ A3070 Painting 25 25 0% 30- Dec -14 02- Feb -15 Painting © A3170 Plumbing &Trench Drainage 20 20 0% 15- Oct -14 11- Nov -14 Plumbing &Trench Drainage o A3180 PCP Heritage Parking Delam Repair 40 40 0% 14- Nov -14 12- Jan -15 PCP Heritage Parking Delam Repair ® A3190 Final Cleaning 5 5 0% 10- Feb -15 16- Feb -15 Final Cleaning ®, ��► 23- Feb -15 '� No Area 0% 1 16- Feb -15 23- Feb -15 �� 23- Feb -15 . ® A4060 i n Substantial Comp let ion 0 0% 16- Feb -15 ♦ Substantial Comple ® A4070 As -Built Drawings 5 5 0% 17- Feb -15 23- Feb -15 As -Built C o A4080 Punchout 5 5 0% 17- Feb -15 23- Feb -15 Punchout ® A4090 Final Completion & CO 0 0 0% 23- Feb -15 ♦ Final Corr o Actual Level of Effort Remaining Work ♦ ♦ Milestone Actual Work Critical Remaining Work Tmm�I summary Page 1 of 1 ASK filter: All Activities © Oracle