Laserfiche WebLink
RESOLUTION NO. 2023 -{may <br />A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, <br />FLORIDA, APPROVING CHANGE ORDER NO. 6 TO THE AGREEMENT WITH THE <br />STOUT GROUP, INC. FOR THE CONSTRUCTION OF THE GOLDEN SHORES UTILITY <br />UNDERGROUNDING PROJECT, IN A TOTAL AMOUNT NOT TO EXCEED FOUR <br />HUNDRED TWENTY-SIX THOUSAND SEVEN HUNDRED EIGHTY-THREE DOLLARS <br />AND NO CENTS ($426,783.00), ATTACHED HERETO AS EXHIBIT "A"; <br />AUTHORIZING THE CITY MANAGER TO DO ALL THINGS NECESSARY TO <br />EFFECTUATE THIS RESOLUTION; PROVIDING FOR AN EFFECTIVE DATE. <br />WHEREAS, the City of Sunny Isles Beach, Florida ("City") issued and advertised Invitation <br />to Bid No. 20-08-01 ("Bid") for professional construction services for the Golden Shores Utility <br />Undergrounding Project and received five (5) bids; and <br />WHEREAS, following an evaluation of the bids, it was determined that The Stout Group, <br />Inc. ("Contractor") was the lowest responsible and responsive bidder; and <br />WHEREAS, on October 21St, 2021, via Resolution No. 2021-3257, the City Commission <br />awarded the Bid to, and authorized the City Manager to negotiate'and enter into an Agreement <br />with, the Contractor; and <br />WHEREAS, the City Manager negotiated an Agreement with the Contractor in an <br />amount not to exceed $5,858,477.87, which includes a contingency in the amount of <br />$375,000.00; and <br />WHEREAS, on May 19th, 2022, via Resolution No. 2022-3345, the City Commission <br />approved Change Order No. 1 to cover the increase in material costs as a result of increases to <br />production and delivery of construction materials, in an amount not to exceed $135,150.30; <br />and <br />WHEREAS, on July 211t, 2022, via Resolution No. 2022-3378, the City Commission <br />approved Change Order No. 2 for the installation of conduits and connections to private <br />meters, in an amount not to exceed $803,000.00; and <br />WHEREAS, via the same Resolution No. 2022-3378, the City Commission also approved <br />Change Order No. 3 for the installation of remaining decorative streetlighting, including poles, <br />luminaries, foundations, and electrical equipment, as well as providing as -built documentation <br />for the final streetlighting and miscellaneous utility conduit installation, in an amount not to <br />exceed $152,735.63; and <br />WHEREAS, on October 20th, 2022, via Resolution No. 2022-3425, the City Commission <br />approved Change Order No. 4 for the addition of new catch basins, manholes, and drainage <br />piping, in an amount not to exceed $304,802.52, utilizing pricing from the FDOT - Miscellaneous <br />Drainage Improvement Contract (E61-97); and <br />@BCL@AC085EOD.doc Page 1 of 3 <br />