Loading...
HomeMy WebLinkAboutBermello Ajamil & Partners, Inc.CONTINUING PROFESSIONAL SERVICES FOR ARCHITECTURAL, LANDSCAPE ARCHITECTURAL, ENGINEERING AND LAND SURVEYING FIRMS ONLY (CCNA) REQUEST FOR QUALIFICATIONS NO. 14-07-02 Bemello fC Ali Inc. Client. 6Q ORIGINAL Al Iry W T in Aiz 1031"1 1 M 1h N� • • • • • • [7 Cba Bermello Ajamil & Partners, Inc. Architecture Engineering Planning i Interior Design Landscape Architecture August 12, 2014 AUv ] L 2014 G�C Ms. Janes Hines, MMC ^' City Clerk - - - City of Sunny Isles Beach 18070 Collins Avenue, 4th Floor Sunny Isles Beach, FL 33160 RE: Request for Qualifications No. 14 -07.02 Continuing Professional Services for Architectural, Landscape Architectural, Engineering and Land Surveying Firms Only (CCNA) Dear Ms. Hines, Bermello A)amil & Partners, Inc. (B &A), along with our partnering sub - consultants, is pleased to respond to the Request for Qualifications presented by the City of Sunny Isles Beach for Continuing Professional Services for Architectural, Landscape Architectural, Engineering and Land Surveying Firms Only, (CCNA) Request for Qualifications No. 14- 07 -02. B &A will be the Prime Consultant for this proposed contract and has assembled a team of exemplary professionals uniquely qualified to provide the disciplines indicated in this RFQ. The Team we have assembled for this proposal brings all of the necessary technical, management and creative skills needed to execute the scope of work outlined in the RFQ under this contract. Our Team can achieve this in a manner that will provide the City of Sunny Isles Beach with superb design and planning skills while keeping within established budgets and meeting specific project schedules. The broad experience base, coupled with the unique composition of our team, allows the City to work with one multidisciplinary group to achieve successful projects. B &A is a locally and internationally recognized multi - disciplinary A/E firm providing complete planning, environmentally sensitive design and construction services in the disciplines of architecture, planning, interior design and landscape architecture. B &A specializes in working with municipalities on a variety of project types including parks and recreational facilities, streetscopes and community centers. Mr. Willy Bermello AIA, AICP will be the Principal in Charge of this assignment. His invaluable experience garnered throughout a career that spans more than 40 years developing projects worldwide, will be invaluable to the success of the various projects we assist the City with. In addition to our own in -house professional capabilities, the Firms selected to be part of our B &A Team understand how to tackle a wide range of project types from conceptual design through to construction. Moreover, our Team is a collection of highly qualified local talent, representing some of the most prominent consulting firms in their respective fields of expertise. 2601 South Bayshore Drive - Suite 1000 • Miami • Florida • 33133 • USA •Main 786 -0865269 D w .bermelloajamilxom 1 • • • • • • • • • • • • • This is a Team that has successfully designed and built a wide range of municipal projects throughout south Florida and understands what is needed to complete projects and meet both the City's and Community's needs. In summary, our Team roles on this project are as follows: Bermello Ajamil & Partners, Inc. Gibbs Land Surveyors TRC Worldwide Engineering, Inc. Louis J. Aguirre & Associates, P.A. E Sciences Inc. Trot Tech Engineering Inc. CMS - Construction Management Services, Inc. Landscape Architecture Architecture Planning /Urban Design Project Management Community Outreach Permitting and Bidding Construction Administration Surveying Structural Engineering MEP and Fire Protection Environmental, Permitting Traffic and Transportation Cost Control and Estimating Alfredo C. Sanchez AIA, AICP, and Senior Partner with B &A will act as the Project Manager and primary point of contact with the City for the duration of this assignment. with over 35 years of experience in the field of Architecture, Planning, and Urban Design (22 of them with B &A), Mr. Sanchez brings a wealth of knowledge in the numerous fields that are part of this RFQ. He will be responsible for ensuring that the City's needs are met on a daily basis and that we provide the . In the following response to the Request for Qualifications, we have provided detailed information that demonstrates our experience and capabilities for the key criteria to be evaluated for this contract. As such, we welcome the opportunity to present our qualifications to you and your selection committee. We look forward to the opportunity to serve the City of Sunny Isles Beach on your future projects. Randy Hollingworth Director of Planning, Landscape Architecture and Urban Design Bermello Ajamil & Partners, Inc. D www.bermelloajamilxom 2 1 Company Information ............... 2 Qualifications ............................. Why the B &A Team .................... Licenses ........ ............................... Experience ... ............................... Subconsultants Qualifications.. 3 Staffing ......... ............................... Project Organizational Chart... Resumes....... ............................... 4 Approach / Methodology........ 5 References ... ............................... 6 Contract Forms ........................... CONTENTS FIT ............... 12 ............... 12 ............... 13 ............... 15 ............... 44 ............... 75 ............... 75 ............... 76 .............. 110 .............. 115 CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14 -07-02 3 4• ° 1- to , RZ !� I rl; ZAN - �• _ 4 to st r _ • � r ; � � �.z.� a . s f• % - m { • laf s �"., 01 .,,s .. B &A focuses on providing our Clients with innovative and sustainable design solutions that celebrate the environment and compliment the built environment. Our team brings expertise in many facets of design and development including master planning, defining community aesthetics and enhancements, planning and design of parks and recreation complexes, and municipal facilities. whetherwe are revitalizing urban streetscapes, designing recreational facilities or creating wildlife habitats, we undertake all of our projects with a keen understanding of the individual and unique characteristics of each site and each client. The B &A team brings extensive project management and construction administration experience to the design process and to the construction phase of every project. COMPANY INFORMATION OVERVIEW Bermello Ajamil & Partners Inc. (B &A) is a local, award - winning South Florida firm providing Architecture, Landscape Architecture, Engineering, Planning, Interior Design and Construction Services. we specialize in providing these services to municipalities throughout Florida and we hold significant expertise in the planning and design of parks and recreational facilities, government complexes and streetscapes. B &A is a corporation headquartered in Miami and organized under the laws of the State of Florida. B &A was originally founded in 1939 as a small local architectural firm and incorporated in the City of Miami under its current name in 1992. we maintain a professional staff of over 70 talented individuals in both throughout all of our offices, that possess the necessary expertise to successfully execute and complete projects for the City of Sunny Isles Beach. Our website address is: www.t)ermelloa6amil.com Cba - CONTINUING PROFESSIONAL SERVICES I RFO NO. 14-07-02 4 Wmkmp Pork, Homestead Beach Kiosk, Pompon Beach James Archer Smith Pork, Homestead Cba COMPANY INFORMATION B &A IS AVAILABLE IMMEDIATELY The entire B &A Team does not anticipate any difficulties handling the workload likely to result from the tasks assigned from this project. As demonstrated repeatedly with our previous work on similar continuing services contracts, B &A is dedicated to commit its professional resources to insure the greatest workforce flexibility and responsiveness to the City. WE ARE "ON- CALL" AS NEEDED. The depth and strength of our experience allows us to perform successfully on all of our contracts, responding in a timely manner and keeping projects on schedule. We have a strong staff in -house with exceptional services from our subconsultant members. The B &A Team is committed to exceeding your expectations on your various projects and is prepared to committ the necessary staff to meet the City's needs. THE B &A TEAM IS AVAILABLE TO START IMMEDIATELY! POINT OF CONTACT B &A's Miami office will be responsible for all services performed under this contract. Mr. Alfredo Sanchez, Project Manager, and Mr. Kirk Olney, Landscape Architect, will be the City's primary contacts. Our office address and contact information are: Alfredo Sanchez, AIA, AICP, LEED AP ASanchez @bermellooiamil.com 2601 South Bayshore Drive, Suite 1000, Miami, FL 33133 Ph.: 305.860.3711 Fx.:305.860.3700 Kirk Olney, RLA KOlney @bermelloajamil.com 2601 South Bayshore Drive, Suite 1000, Miami, FL 33133 Ph.: 305.860.3709 Fx.:305.860.3700 TYPE OF ORGANIZATION Originally founded in 1939 as a small local architectural firm, B &A was incorporated in the City of Miami under its current name in 1992. B &A is a State of Florida corporation and is licensed, permitted, registered and certified to do business. CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14-07-02 5 RESPONDING TO THE CITY Our Team has a reputation for on -time, on- budget delivery of quality designs and accompanying documents. B &A's Project Manager, Alfredo Sanchez, will be readily accessible to respond to the City's needs and meet their expectations for a rapid, efficient and quality delivery of this project. EXPERIENCE WITH REGULATORY AGENCIES Early identification of the agencies having jurisdiction on a project and a clear understanding of their standards, specifications, permit requirements and time frames associated with processing and review of the plans and permit applications is vital to the success of any project from a scheduling and budgeting perspective. B &A has unparalleled experience with regulatory agencies. The following is a list of some of the agencies that B &A routinely interacts with: • Miami -Dade County - Building and Zoning - Public Works - Water and Sewer - Fire Department • Florida Department of Transportation • South Florida Water Management District (SFWMD) • Florida Department of Environmental Protection (DEP) • US Army Corp of Engineers (COE) • DERM Coastal Wetlands Section • DERM Fresh Water Wetlands Section • State of Florida Department of Health OFFICE TO BE RESPONSIBLE FOR WORK PERFORMED Miami (Headquarters) 2601 South Boyshore Drive, Suite 1000 Miami, FL 33133 Ph: 305.859.2050 Fx: 305.860.3700 COMPANY INFORMATION CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14 -07-02 6 SERVICES Landscape Architecture, Planning & Urban Design Site Master Planning, Analysis and Design Environmental Planning Comprehensive Planning Neighborhood Planning Park and Recreation Planning & Design Streetscope Design Rezoning Permitting Feasibility and Peer Review Analysis Aesthetics Guidelines Construction Services • Project Management • Cost Estimating & Scheduling • Plans Processing and Permitting • Construction Administration • Construction Engineering & Inspection (CE &I) Post Evaluation Analysis Construction Administration Engineering and Permitting • Civil Engineering • Land Development • Port Development • Marina Design • Cruise Industry Services • Aviation Highway Design COMPANY INFORMATION Architecture Architectural Guidelines and Design Programming Existing Facilities Survey & Building Certification A.D.A. Surveys Zoning Analysis Site Planning Construction Phase Services Contract Documents & Permitting Interiors Space Planning Interior Design Furniture & Custom Millwork Design FF &E Specifications & Pricing Packages Furniture Inventories Art Selection Way- finding Signage & Graphics Procurement Post ID Design Evaluation Other Services Community Development & Public Information Development of Regional Impacts (DRI) Resort Design Port Planning Transportation/Transit Planning & Design Water & Sewer Dredge, Fill and Development Permits �� ",,,�,�,,,,,�.,�•,•, CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14 -07-02 7 1� NiAl 1 a"I K'm SUSTAINABLE DESIGN - B &A LEED SERVICES B &A is committed to developing sustainable and fully integrated designs while determining realistic cost - saving opportunities. As a member of the U.S. Green Building Council, B &A has established an early commitment to the green building movement by creating o department dedicated to providing LEED consulting services. Our LEED Accredited Professionals cover each stage of sustainable design and the LEED Certification process. B &A has the knowledge and skills to successfully integrate sustainable design and the LEED Certification process. B &A embraces the principals of energy efficiency and environmentally - responsible design and is dedicated to providing our clients with healthy environments that increase energy efficiency and decrease environmental impact. COMPANY INFORMATION B &A's Broadway Pier at the Port of San Diego (above) successfully underwent the LEED certification rating process and the building has attained a Gold LEED Rating. B &A has registered other projects with the U.S. Green Building Council for LEED certification. RECOGNITION B &A has won numerous design awards and our projects have been rewarded by consistent commissions from local, county and state agencies. B &A has been consistently recognized for its design excellence by the Society of American Registered Architects, American Institute of Architects, American Planning Association, and Florida Institute of Consulting Engineers. B &A has enjoyed a place among the top businesses in South Florida. In 2009, B &A was recognized as one of the Top 500 Design Firms and in 2008 we were awarded the Firm of the Year Award by AIA Miami. Recently we were awarded the Grand Award in Cba ..,. CONTINUING PROFESSIONAL SERVICES I RFO NO. 14 -07-02 9 [1 e e • • • • • • e e e • l3be .r+. .— COMPANY INFORMATION State of Florida Department of State I certify from the records of this office that BERMELLO, AJAMIL R PARTNERS, INC. is a corporation organized under the laws of the State of Florida, filed on February 28. 1977. The document number of this corporation is 528526. 1 further certify, that said corporation has paid all fees due this office through December 31, 2014, that its most recent annual report/unifaml business report was filed on January 2. 2014, and its status is active. I further certify that said corporation has not filed Articles of Dissolution Given under taf hand and the Great Seal of the State of Florida at Tallahassee, the Capital, this the Second dqv of January, 2014 ju Secretary of State Autheotiattiou to: CCD661936194 To autheotidte this tenia tedisit the following site.enter this to, and theo folbw the iostrunioos displayed. hays: / /efile uobinorg/renauthser.btml CONTINUING PROFESSIONAL SERVICE I RFQ NO. 14 -07-02 fill Cba — ..4 L d: 31137 BERMEAUI ACORD.. CERTIFICATE OF LIABILITY INSURANCE COMPANY INFORMATION FYI 1V0]201J MIS CERT TE M ISSUED AS A WTTEA OF aFMWTIDN W Y"D COIIFERS NO WDM611PO11 ETD: fENNXATE Igl➢ER. MIS CERTIFIUTE DOES NOT AFFWWT YOR �T YMEND, ExTFMI OR ALTER THE COVERAGE AFWImE➢BY THE POLCES BELOW. TNIS CERTF n OF DRURANCE DOES N CWSiITUIE A OOMAACT BETWEEN THE OOOMG DMUREP43A AUTNORDm REPRESENTATW OR PROQICER, Alm THE CERT6J n HOLDER. OPORTANT: Btl u MNrbn AOdiM pSUREO.tl pobcy(Y) ^ ,Ww .a WBROW IS WY ,.Wj.Cm Dw Ymv utl mtlt4e of Dy paDry. wRaN pcEtla IM' WPW..n aYlnwlwN.1 YbbnW W an tl6 exWOb Ceo M wM M161NS b IN ortLrYO Noltr b � et.uN �4vo.�.WIs1 PNmNa U51 hbunlr.A Son . LLC4L EsOw Garcb 6 956 60]409] 610 ]61-0511 100 Wut Lypa$4 CMk Ra f6W Es,tw.GV Wwi.Gx Fort LaDRBNaY, FL 2tWNKKJ]OB 1111201] 934 60]]000 �. _ H4TRa0 Casualty buonllc4 Can 119114 F.el Into 000 I.N4u6 TW CRY FR4 Insolann Cambn tmw B W. Ajamil B PaRnan. Inc. 2601 5 BeY$lgra m 5b 1000 �y c. ConUTMnaI Gau$Ry Canpany 20UJ 1 Miami,R 331} UV 21WNKKJ709 I THIS M TO CfA P T 11E fVlr&S OF a9n1NIQ MTEO M1 1MYE BEEN 45VED TO ME a5VFE0 wYFDb FORTE fCILY F£gp0 pSfllEO. NJI WII16TAlltaf ANY REQIEYENi. IEIW OR QYC1iCINOG 4!I CCNI l OR OTI OOgbFlll . RESPECT TO NTL11116 CERTf TE WY BE 6511ED OR WY PEFT.W. ME KAgAN(E AFFg1DE0 BY ME R S (LSUAED IEREW 6 SIISECT TO .LLl 11E lEiU6. E+4LLL'KS N9 CbE1TAi6 OT 94H FttICFS. UI s YgnN wY wvE BEEN RESTNED BY PA fIM 5. LA F Wu¢ AaSR Wf . TIE PONY MOVm'1NB. .una ®wvmr.mY •J'i�e �s1000000 °'°""'°'^' XI rmul mou sraam I a..snwE ❑X scan 2tWNKKJ]OB 1111201] 11/112014 Cu anFaana 0]00 000 F.el Into 000 NAm 1st 000 BOO awn acre s 000000 a3n.axurtvrr ANans Wn _ M — .__Is 000000 A I I Nn wD I1 %I I I 21WNKKJ709 1 /11201] 111118014 .�. 101,000.000 wmE" vel 1 s Is A I Xlum — Ivan O.$ X Omn aA.e...rE 21%HUKKJNO 11112013111112014F.�avFFen¢ 105000000 aruECUre s5 o00 oo0 I Ian XI RETOnox,loow I. B °°m°fO°OA1° .x. �a �ccivrne'�" �n.nn N vu�w.nuee� 21WBAOI371 1111201] 1v1,120ux •c n.na °"I 0s ra�.omT 10, Dm EE TRh4 -En EbamTEl sl owco0 u.r l.1 D0D 0o0 E$5,000,000Pa L POObubna b Timms MaM AEH28816IIJ1 IRmu Dab 1111201] 11182008 111118014 If100000 Claim D40uc0b14 amsmN s awlm O,.Y.Tm� W.eE4 vea.cpim �n...rr r.r Id•e... �..�. ...a�.q SAMPLE LERT,FILATE $Mann An OTTHEABOVEDEWa PaX.4$BECANOETIEDaETPE THE Qf9UlTON DATE i EREOF, lgitE Mtll BE DEINERED W AaSR Wf . TIE PONY MOVm'1NB. .una ®wvmr.mY •J'i�e 019aamTO AwRD wRpoRAnDN. u nym,dY.n AC u (MWO5) 1 pl 1 Tlr ACORO nWno W Iqp v rpb m a AWRD R1124096YM11240601 RO CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14 -07-02 11 r•4 �� n _ � A -a • 3 ..��'�A^4 File 06 zk �'iY ( r� _ yr r•4 �� n _ � A -a • 3 ..��'�A^4 File 06 zk �'iY _ yr r•4 �� n _ � A -a • 3 ..��'�A^4 File 06 zk �'iY QUALIFICATIONS WHY THE B &A TEAM? B &A meets and exceeds the requirements set in the RFQ by: • Experience working for the City of Sunny Isles Beach B &A has been serving City, State and County public clients for over 20 years, providing design services of exceptional quality and value. • Seasoned Professionals - The wide breadth and depth experience of the professional staff of B &A makes it best qualified to perform the contract. B &A's lead professionals have, on average, over twenty years of experience in their respective fields. Our professional staff can deliver projects of excellent quality, creative designs on time and on budget. • Multi- Disciplinary Team - Our project management staff understands the multitude of specialties that are required to create a successful project. B &A has assembled a highly qualified team of firms and professionals to address the varied project needs that range from surveying of a property or site, analysis of traffic and parking, grant writing, engineering and other specialties as they may be required for. • Emphasis on Methodology /Approach - Our projects are developed following a well tried and practice process of approach that provides for a thorough understanding of existing conditions, client needs and preferences, community preferences, summary of issues and opportunities, alternative options and their evaluation; and the creative process of design; and the final implementation of the project. Award Winning - The quality of work we generate is superior; we are highly regarded by our peers; and we are recognized by other professionals in the industry as being a quality A/E firm. Experienced in Community Involvement - B &A's personnel is experienced in providing a level of community involvement to address the most controversial of projects. • Portfolio of Projects - Our portfolio of successful projects in the field of planning, architecture and landscape architecture attest to the ability of our professional staff and the depth of the commitment that these individuals bring to each project undertaken. • Responsiveness - We understand the nature of a Continuing Services Contract, that there are small projects and there are larger projects. Our staff is responsive to our client needs and is always ready to answer questions, meet with the client, and address projects and project issues as they may be presented. • Being headquartered in South Florida means we understand local business development and are committed to you and the community you serve. • We are a local company with a global impact. • We create great projects with great people. CONTINUING PROFESSIONAL SERVICES I RFO NO. 14 -07 -02 12 LICENSES - DEPARTMENT OF BOAR AP.EARCHITECT BUSINESS Z . -HAS REGISTERED • - — �� misions.of Chapti`491_F.S.- `" - te:, NOV 30,,2015 =` — - -- QUALIFICATIONS ESSIONAL REGULATION a� HITECTURE � \�; ��� m►RO1fl�sua. RICK SCOTT ISSUED: 10(132013 SEGO L1310230002623 KEN LAWSON ` - - - - — STATE OF FLORIDA . - - DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION r _ _ —BOARD OF ARCHITECTURE &',INTERIOR DESIGN ��diiFFll��Raall _1 �n state' OZY, 7 Board ?of R4 ff - r7i . Ay mello A I Berdam m 1CCH v`t t is authorized under the rovisiona oIf Seed. to the public through o Frofessiodal•Engrneer,, '.h. , Expiration: 2/282015 `Ir 1 Audit No: 228201502200 Certificate Cba ...........R IRI RMA;,N ti crida igreers x::h c; - - InC tatvtes, to offer engineering services Jdi_'Chopter 471, Florida Statutes:.,-:., L < CA lie. No:.. n .., .,' 6304 CONTINUING PROFESSIONAL SERVICES I RFO NO. 14 -07 -02 13 QUALIFICATIONS Vs Io- 1 1 rU K TTn ? t 1A. poF�j ;t v a fit` r1lu ra_ CUMVIrOp eau u z 4!� nna eo r ��cvcirgaa �%►+�nnt r Pr P � ��e� �G7(IIJ96�Iiltlti Cba e...r....r.9..... S 1( � T i ti Y' �J RYA 11911195. ] \\ „11_1]11\• a4 "a, a 7,2 s� u- -4c ^, ° a Ix i Mil an s T in cl ?; 11 1911 R6 d.$1D �I+S1SR1aP:l �� IIILIE.'.rtl ° �7�� t l4pu!�t�'FF�iF1jt +;�t�pe�l�;,p' u 1 !A �.Y J t t i r• :� f r T. CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14 -07 -02 14 0 e • 0 e O • e e O • 0 O • QUALIFICATIONS SIMILAR EXPERIENCE B &A has extensive experience providing similar services to public agencies under Continuing Services Contracts. Our clients include: • City of Sunny Isles Beach - Architecture and Engineering • City of Hallandale Beach - Architecture and Engineering • City of Pompano Beach - Architecture and Engineering • City of Pompano Beach CRA - Architecture and Design • City of Pompano Beach - Landscape Architecture • City of Deerfield Beach - Architecture and Engineering • City of Tamarac - Architecture and Engineering • City of Coconut Creek - Architecture, Landscape Architecture, and Planning • Broward County Public Schools - Architecture and Engineering • Broward County /Port Everglades - General Consultants • Broward County /Port Everglades - Architecture • Broward College - Program Management Services • City of Doral - Architecture and Engineering • Village of Palmetto Bay - Professional Consulting Services • Monroe County - General Engineering Services • Town of Miami Lakes - Architecture • City of Miami Gardens - Architecture, Planning and Landscape Architecture • City of Miami - Construction Engineering Observations • City of Miami - Architecture • City of South Miami - Architecture and Engineering • City of Coral Gables - Continuing Architecture Services • City of Miami Beach - Architecture and Engineering • City of Miami Beach - Construction Engineering & Inspections • City of Homestead - Architecture, Engineering, Urban Design and Planning • City of Hialeah - Architecture and Engineering • City of North Miami - Civil Engineering and Urban Design /Planning • City of Key West - CEI for Sidewalk Projects • FDOT District 6 - Districtwide Miscellaneous Design Services Contract • FDOT District 6 - Districtwide Public Involvement • Village of Wellington - Architecture • Miami -Dade Expressway Authority - General Consultants • Port of Miami - General Consultants • City of St. Petersburg - Engineering • Florida Atlantic University - Architecture and Engineering • Miami -Dade County Public Schools - Building Code Consultants • Broward Health - Architecture Cba ......,.•..k CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14 -07 -02 iE • • • • • • • e • • e • • e • 0 0 • • 0 Cba..... - QUALIFICATIONS EXPERIENCE LANDSCAPE ARCHITECTURE CONTINUING PROFESSIONAL SERVICES I RFQ NO. I4 -07-02 16 • • e e e • e e • e 0 • • • • 0 0 0 0 • • • e • • • • e • • • • e • • • • • e • • QUALIFICATIONS EXPERIENCE Intracoastal Park North Intracoastal Park, in Sunny Isles Beach, Florida, is the development Sunny Isles Beach, Florida of two, vacant 1.5 acre parcels, located between Collins Avenue and the intracoastal waterway to the west. Client: City of Sunny Isles Beach The project included the addition of a 5' tall concrete /CMU screen wall along the southern property line, decorative stone columns and an aluminum picket fence along the Intracoastal Waterway consistant with the City's theme for fencing, benches, trash receptacles, picnic tables with colorful umbrellas, bike racks, paved walkways, site grading, security lighting, landscaping, and irrigation. The project also included the sighting and placement of park signage and three sculptures provided by the City. The now completed project provides two new linear passive parks for visitors and neighbors to relax in the sun or shade, throw a Frisbee, kick around a soccer ball or enjoy a walk along the meandering walkway adjacent to the intracoastal waterway. In addition, the park was designed to accommodate a dock facility along the intracoastal to be added in a later phase of development. CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14 -07 -02 17 m e. �. 7 n T 11 1 � Ar. 6 r� v e O 6 O e e e • e • 0 0 e e e • • e e • 0 e 0 QUALIFICATIONS EXPERIENCE George Brummer Park B &A provided landscape architectural, architectural, and Pompano Beach, Florida engineering services for improvements to George Brummer Park (formerly Palm Aire Park), a community oriented park on the west Client: City of Pompano Beach side of Pompano Beach. The site had previously been utilized as a private tennis club but was sold to the City for use as a public recreation park. working with the City and local residents, B &A developed multiple design alternatives and presented them at various public workshops and community meetings. After obtaining input from neighboring community organizations and City officials, a final master plan was developed for the park site. Cwa ...- Improvements to the 5 -acre parcel included six new tennis courts, two handball courts, two bocce courts, a beach volleyball court, two playgrounds, a basketball court, an outdoor fitness facility, a restroom pavilion and a large waterfront open space for community events and activities. A small parking area was also incorporated into the plan to allow convenient access for the entire community. Once completed, the park became a focal point for local residents of all ages enjoying the extensive opportunities for recreation. B &A also provided construction management services on this project. CONTINUING PROFESSIONAL SERVICES I RFO NO. 14 -07-02 20 e O e • e e 0 0 0 e e 0 e 0 e 0 e e • e e e e e • • • • QUALIFICATIONS EXPERIENCE 0 Sullivan Park B &A developed alternative master plan concepts for an existing Deerfield Beach, Florida 3 -acre, underutilized waterfront park. Although the existing park was visually isolated due to its location Client: City of Deerfield Beach and poorly maintained, the City wished to incorporate the park info redevelopment of the waterfront and the City's new commercial core to the south. with a significant historical background, the site offered on opportunity to educate park users about the colorful history of the community and the role the site played in that history. A primary goal of the park master plan and design was to provide an interpretive program for visitors. The approved development program for the revitalized park included two playgrounds, a restroom pavilion, picnic shelters, an interactive water feature, a 15 -foot -wide waterfront promenade and o new stair tower to connect the site to the bridge leading over to the City's beachfront area. Since the City has limited Intracoastal waterfront access, one of the primary goals for the park's redevelopment was to increase public access to the water. This was accomplished by incorporating a small manna along the north shoreline of the park and a floating dock along the east shoreline for safely launching paddle boards and kayaks into the water. Through meetings with City staff and neighboring residents, a final concept design was selected and approved by the CRA. CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14 -07 -02 21 QUALIFICATIONS EXPERIENCE rn�1 Harry S. Truman Presidential Park B &A was commissioned by the City of Key West to develop an Key West, Florida overall master plan for this 23 -acre waterfront site adjacent to the historic Fort Zachary Taylor Park and Naval Base. Working with the City, the community, and adjacent neighborhoods, Client: City of Key West B &A developed an overall pion which would attract both local residents and visitors to the waterfront. The entire development of the Truman waterfront is envisioned as a water related, park -like environment where the City will enjoy revenue from various commercial components to assist in the expenses of maintaining a worldcloss park. The park master plan incorporates a redesigned 50 -foot -wide waterfront pedestrian promenade, a pedestrian bridge to soon Admiral's Cut, on open air amphitheater with 200 fixed seats, a renovated Navy Generator Building to be reused as a restaurant, historical museum and public restrooms, an interactive water feature with two adjacent shaded playgrounds, an exercise trail with outdoor exercise stations, a 35.000 -SF recreation center with an adjacent synthetic turf multi- purpose athletic and event field, and new horse stables for the Key West Police Department. B&A is presently developing a complete set of construction drawings for the first phase of the project which is expected to cost $23 million and cover approximately 80% of the site's overall development. Cba CONTINUING PROFESSIONAL SERVICES I RFO NO. 1 4-07-02 22 LIFICATIONS EXPERIENCE James Archer Smith Park B &A was awarded a contract to provide the planning, landscape Homestead, Florida architectural, and architectural designs necessary to renovate and revitalize this 4.70 acre park located in Homestead, Florida. The Client: City of Homestead existing park was underutilized and in a deteriorated state, offering few recreational opportunities except a small playground with outdated equipment and landscaping that was in total disrepair. In order to breathe new life into this community park, our designers developed a master plan that included the addition of two secured dog parks with specialty canine exercise equipment, a children's interactive water feature with an adjacent restroom facility, a playground area utilizing both existing and new playground equipment, a 20- station state -of -the -art exercise system for various age groups, open play and picnic areas with shelters, a peripheral on- street parking layout, extensive landscaping, and both decorative and security lighting throughout the park. Now completed, the park serves as a social focal point for the adjacent community. CONTINUING PROFESSIONAL SERVICES I RFO NO. 14-07-02 23 UALIFICATIONS EXPERIENCE Cba ...,.. k Wittkop Park The new Wittkop Neighborhood Park includes a number of Homestead, Florida recreational opportunities and alternatives for local residents. Within the park are two professional level basketball courts, two Client: City of Homestead separate age defined tot lots, two handball courts. a walking trail, picnic areas with shelters and restroom facilities. In addition, the park has been provided with convenient on- street parking on both the north and south sides and a new lighting system which provides a safe and attractive environment for residents at night. Period light fixtures have been selected to light both the on- street parking and all pedestrian walkways in the park. The project is located on 2.5 acres adjacent to the City's Water Tower in the City of Homestead. CONTINUING PROFESSIONAL SERVICES I RFO NO. 14 -07 -02 24 1. WTI! Tls; . . . . . . . . . . . IRA M it ..... ..... 11 O QUALIFICATIONS EXPERIENCE Losner Park Losner Park is a major open space for both the City's Downtown Homestead, Florida and the Krome Avenue sector of Historic Downtown Homestead. This is one of the City's most centrally located parks and can Client: City of Homestead become a point of attraction for citizens of all areas of the City of Homestead. The project addressed the identification of public uses that could be included in Losner Park to make it more active and attractive to the community at large. The inclusion of an interactive water feature was identified to attract families and help local businesses. The Interactive Water Feature design proposes maintaining a substantial amount of green space that is presently in the park; green space that is also used as a viewing area for the stage. The stage will not be impacted in its design or viewing area. The water feature provides an opportunity to create a seating area facing the stage and a hard surface to connect activities in the park. An open air eating area adjacent to the Seminole Theater is proposed. This eating area will work in conjunction with a concession. CONTINUING PROFESSIONAL SERVICES I REG NO. I4 -07 -02 26 H ID 0 0 O QUALIFICATIONS EXPERIENCE Doral Meadows Park In conjunction with Recreational Design & Construction, Inc. (RDC), Doral. Florida Corzo Castello Carballo Thompson Salmon, PA and city officials, Bermello Nomil & Partners, Inc. provided the programming, master Client: City of Doral planning, schematic design, design development and construction documentation for this 14 -acre regional urban pork within the City of Doral. The park includes two lighted baseball fields, bleachers, a shade - covered playground, concession /restroom building with a covered pavilion, one Sportex synthetic turf football /soccer field, Vito Course exercise path, fitness walking /jobbing trail, batting cages and ample parking. Keeping environmentally sensitive design in the forefront, both fields are illuminated with the Musco Light - Structure Green system and native landscaping surrounds the project. The final phase of the park's state-of-the-art facilities was concluded in record time. CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14 -07-02 27 QUALIFICATIONS EXPERIENCE Margaret Pace Park B &A, in conjunction with the City of Miami's Community Miami, Florida Redevelopment Agency, provided the programming, master planning, schematic design, design development and construction Client: City of Miami CRA documentation for this 8.25 acre, regional urban park on the City of Miami's waterfront. Society of American Registered Architects. The overall park plan includes four tennis courts, two soccer fields, Design Award, 2003 one cricket pitch, tot lot and children's playground, exercise stations, street and water oriented urban plazas, waterfront Gold Coast American Planning Association promenade, shoreline stabilization, picnic shelters, site furniture, Award, 2nd Place, 2003 security lighting and landscape improvements. Since the park opened, it has become a social magnet for the community and is popular with all age groups. This urban oasis serves local residents from adjacent high density residential developments and those from other areas of the city. The incorporation of locally inspired public art provides the park it's own identity and sense of place in the community. CONTINUING PROFESSIONAL SERVICES I RFQ NO. I4 -07-02 OV e • • • • • • • • • • • • • • QUALIFICATIONS EXPERIENCE ARCHITECTURE C� CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14-07-02 Pill s E7 QUALIFICATIONS EXPERIENCE Aventura Community Center Making a dynamic statement at the edge of the bay with Aventura, Florida a strong sweeping curve acting as a monolith pedestal, Bermello, Ajamil & Partners envisioned the project to act as Client: City of Aventura the heart of the city's public /civic destination. The scope of the project included preparing a master plan within a 3.2 acre waterfront site, and provided full design and documentation Society of American Registered Architects including architectural interior design, landscape architecture Professional Design Award, 2008 and civil engineering services. The building is divided into athletic, educational, and administrative rooms and gathering spaces, organized by a linear gallery space with functional rooms on one side and glass on the other, emphasizing the view to the park and water. An 8.800 SF gymnasium with a 150 person seating capacity anchors the gallery and all multi - purpose rooms. The open spaces consist of entry pavilion, covered walkways, a tower, and spaces for informal gatherings. CONTINUING PROFESSIONAL SERVICES I RFO NO. 14 -07-02 30 e 0 • • • • • • • O • • • • • O • • • O • • • • • • QUALIFICATIONS EXPERIENCE Gaines Park Community Center B&A designed this 10,000 SF multiuse community center that West Palm Beach, Florida includes a variety of public use spaces for meetings, large banquet / events and classes. Located directly west of the Client: City of west Palm Beach existing Gaines Park Recreation Center, this new facility is organized by a central double- height barrel vaulted space that provides primary circulation throughout the building. The (2) primary function spaces are accessible from this main "spine ": to the north, the 4,500 SF multi - purpose room and to the south, the 800 SF classroom. Both spaces include a central movable wall that allows each space to be divided into two. The exterior design and colors complement the existing buildings while providing a new and exciting Architectural style for the Community Center. This new facility also includes a large porte- cochere / entryway canopy for drop -off and pick -up services for large events. In addition. B&A renovated the existing north wing that accommodates additional classrooms, meeting rooms, full working kitchen, audio recording studios and offices. CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14-07-02 31 e • • • • • • • • • 0 • 0 0 • • • • • • • QUALIFICATIONS EXPERIENCE Highlands Community Center B &A was commissioned by the City of Deerfield Beach to Deerfield Beach, Florida design a new 3,500 SF Community Center located at 571 NE 44th Street in south Deerfield Beach. The new community Client: City of Deerfield Beach center was inserted into the existing 2.16 acre triangular park to accommodate a variety of community based functions. The main multi - purpose space can be divided into (2) two separate spaces that accommodate a variety of uses at the some time. The facility has a dedicated service area for catering. The park already has adequate parking and utilities to accommodate the new building: site improvements includes additional landscaping, new sidewalks to the building (main entry / front and a separate service / back of house) and new shade over the existing playground area. The building is designed to accommodate emergency operation communications for the community before, during and after a hurricane. Cba CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14-07-02 32 0 • • • • • • s • • • • • • 0 • • • 0 0 0 0 O • 0 • • 0 • QUALIFICATIONS EXPERIENCE B.F. James Park This project encompassed the complete redevelopment of an Hallandale Beach, Florida underused existing neighborhood park through extensive public input and master plan development. From the neighborhood meetings, B &A developed an extensive program for the new Client: City of Hallandale Beach park including a new community swimming facility, relocated basketball courts, picnic areas, exercise stations and an expanded playground for a greater range of age groups. In addition, to meet City code requirements, the park and buildings were designed for LEED Certification. B &A managed the LEED Certification and led the design team through the certification process. B &A developed various architectural alternatives for the aquatic swim building. The architectural style of this facility will serve as the bases for the design of all public buildings in future City parks. Although relatively small, the new pool will serve the community's recreational needs and includes a beach entry feature and three lap lanes which can be modified for swim health classes. A new parking lot proposed along the south side of the park was designed to both improve community access and allow for improved visibility into the park for the police department. The park was designed utilizing numerous CPTED principles. CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14 -07 -02 33 • • • • • • • • • • • • • • • • • • • • • O O Q • O QUALIFICATIONS EXPERIENCE South City Beach Park This project includes the complete renovation of one of two Hollandale Beach, Florida beach front parks in the municipality. The existing 3.5 -acre site, aside from the parking lot, was covered with Category I Invasive Australian Pine Trees that were removed for environmental Client: City of Hallandale Beach reasons, making way for a variety of opportunities. With community input during the master planning process the park use and amenities were reimagined. The park is divided into four quadrants accessible via bisecting palm shaded walkways. Each quadrant has its own identity and use, from sand volleyball to bocce courts as well as covered playgrounds with safety surface to a large beach front concession building. This facility is the focal point of the park and as designed as two buildings separated by a breeze way: which frames a focused view of the Atlantic Ocean. One building is a restroom facility while the other is a built out shell ready to be leased to a snack bar type vendor /concession. The project scope included extensive coordination and ultimately the acquisition of development permits from Florida Fish and Wildlife and Florida Department Environmental Protection Bureau of Beaches and Coastal Systems. Chia .. . CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14 -07 -02 34 0 • • O • • e 0 F • • O e Q 0 QUALIFICATIONS EXPERIENCE Pinecrest Community Center Master Plan Village of Pinecrest, Florida Client: Village of Pinecrest B &A was selected by the Village of Pinecrest to evaluate and Master Plan the existing Pinecrest Community Center. The existing facility and 14,600 SF Community Center Building are approximately 5' /z years old and well used by local residents. However, budgetary constraints at the time of design and a compromised planning stage has resulted in a facility now considered outgrown and undersized to serve the needs of the Community. B &A was commissioned to evaluate the existing Community Center Building and surrounding facilities as well as currently offered programs and activities. In addition, B &A lead a public outreach effort on behalf of the Village which included hosting three charrette -style Community Meetings, surveying residents and collecting public input. B &A developed a Master Plan suitable for implementation over extended phases as funding is allocated and /or the need for additional programming increases. The proposed Master Plan projects the physical growth of the Community Center Building over three phases to a total of size of 31,500 SF and accommodates the following programs: • Basketball /Volleyball Gymnasium • Cardio Fitness and Weight Training Room • Group Cycling (Spinning) Studio • Aerobics /Dance Movement Room • Multi- Purpose Meeting /Instruction Rooms • Male & Female Restroom & Shower /Lockers • Indoor Playground / Toddler Room • Indoor Cafe and Concessions Vending • Offices and Support Spaces The proposed Master Plan responds to present -day gauged public input as well as the Village's current needs and objectives. Nonetheless, it was purposefully designed as a dynamic expansion plan capable of accommodating evolving programming needs as future phases are implemented. Cba CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14-07-02 35 s • • e e e If • e e • e e e e QUALIFICATIONS EXPERIENCE Pompano Beach Boulevard Kiosk Building Pompano Beach, Florida Client: Pompano Beach Community Redevelopment Agency Before Cha .. .. ..... After B &A was tasked by the Pompano Beach CRA to analyze the beach's existing concession building, aptly named the "Kiosk" Building, for transformation both functionally and aesthetically into a prime destination for public beach amenities. The program includes restrooms and 3 different concession venues. All of these were designed into the existing footprint of the building, which was integrated into the new Pompano Beach Improvements design along a prime pedestrian pathway with a large deck area for cafe style tables and chairs. Located in the heart of City's prime beach district, the Kiosk building is one of very few existing structures east of the coastal construction line deemed too valuable to remove. One key requirement in the redesign was the need to completely remove and replace the existing and deteriorated Flat roof. B &A designed a taller sloping standing seam metal roof that provides greater shade for the building while providing more verticality and allowing it to be seen from greater distances along the beach. The B &A team provided all new design, architecture, mechanical, electrical and plumbing systems, and structural upgrades. CONTINUING PROFESSIONAL SERVICES I RFO NO. 14 -07 -02 0 C O 0 d O QUALIFICATIONS EXPERIENCE 3 � Morgan Levy Park and B &A developed three distinct design schemes for renovation of Community Center this 14 -acre Park, a neighborhood recreational area in the City of Doral, Florida Doral. In designing the renovations, B &A incorporated both active and passive recreation facilities, working within the confines of Client: City of Doral the existing site layout which included tennis courts, a recreation building and a parking lot. B&A provided plan development, preparation of design documents, and maintenance standards and assisted the City in the bidding and negotiation phases as well as construction administration. B &A was also responsible for the renovation of another site, the 14 -acre Doral Meadow Park, as well as the master plan for another 3 -acre park. CONTINUING PROFESSIONAL SERVICES I RFO NO. 14-07-02 37 QUALIFICATIONS EXPERIENCE C North Shore Park B &A prepared the master plan for North Shore Park and Master Plan Implementation provided full architectural design and civil engineering services Miami Beach, Florida for the redevelopment of this 17.22 acre facility and 20,000 SF Community Center. Client: City of Miami Beach B &A's design consisted of a 2 -story Youth Center which houses a large multi- purpose room with hardwood stage that caters to afterschool programs and other activities, a gym and a regulation high school basketball court with full locker rooms and showers. The park has 12 tennis courts with an adjacent tennis /pro shop, a practice court and a maintenance garage. Ten of the courts are green clay hydro -courts and 2 hard courts for handicapped players. The park also offers 2 shuffleboard courts with shade structure and 2 baseball fields with dugouts and clay infields. Cba ... CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14 -07 -02 38 [I] i QUALIFICATIONS EXPERIENCE Miami -Dade Expressway This 14,000 SF building was designed to house a state- of -the- Authority (MDX) art traffic center, a boardroom and general office space. B &A modified the existing one -story building to create a gateway into Headquarters Facility the new space. The connection between the two structures is a Miami, Florida lushly landscaped courtyard covered with a translucent canopy, Client: Miami -Dade Expressway Authority providing uninterrupted operation of the existing building during construction. Award of Excellence, Society of American The highly visible curved roof adds to the expressive structure and Registered Architects. California, 2005 provides the much needed "signature" element requested by the client. This building has been designed to optimize the views Design Award, Society for Registered for the client while reducing the heat load on the building. The Architects, 2005 Traffic Management Center monitors and controls roadway and toll facilities in b major transportation corridors in Miami. Cna . . .. CONTINUING PROFESSIONAL SERVICES I RFO NO. 14-07-02 II&I 0 O 0 QUALIFICATIONS EXPERIENCE Public Safety Complex Due Diligence Report Pompano Beach. Florida The scope of this project called for the preparation of a due diligence report pertaining to exterior fapade improvements Client: City of Pompano Beach to the 70,000 square foot existing public safety complex that included the assessment of the existing exterior building conditions to understand the key problems related to the exterior "skin ", finish, fenestration waterproofing, etc. BB,A provided final recommendations for improvements to the exterior facade and a cost estimate for said improvements. Exterior Building and Site Improvements This project consisted of the implementation of the recommended exterior facade improvements from the original due diligence report to correct existing conditions, minimize regular required maintenance and extend the life of the exterior "skin" of the public safety complex. Additional consideration to exterior landscaping, lighting, and aesthetics will be included in this scope. This includes full construction documents, cost estimates, permitting and construction administration. CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14-07-02 40 QUALIFICATIONS EXPERIENCE North Bay Village The City of North Bay Village awarded B &A the schematic design Public Safety Complex of a new public safety complex to replace the city's current city North Bay Village, Florida hall and police station, both of which are in a state of disrepair. Client: North Bay Village The new municipal complex will be built on 35,000 SFof land on the southeast corner of the 79th Street Causeway. It will house a new police station and fire rescue department, replacing the current unsafe facilities and will include a community center as well as an enclosed garage with safety features that can withstand a Category 5 hurricane. CONTINUING PROFESSIONAL SERVICES I RFO NO. I4 -07 -02 41 H 0 QUALIFICATIONS EXPERIENCE rc�11° '0 41 Museum Parking Garage In order to support a rejuvenated retail environment along Coral Gables, Florida the renowned Miracle Mile corridor, the City of Coral Gables requested that B &A design an 8 -story parking garage that would Client: City of Coral Gables support more than 600 spaces, and provide for retail space along the ground floor on an adjacent street. Designers were to follow strict guidelines calling for Mediterranean -styte architecture Society of American Registered Architects, synonymous with the city. Professional Design Award, 2008 Designers created a 12,000 SF retail liner on the ground floor of the project. This is highlighted by a space specifically planned for a local theater. The theater presented a particular challenge since the garage had to be sound insulated. A pedestrian promenade contributes to the continued revitalization of the area. CDa ....e..... CONTINUING PROFESSIONAL SERVICES I RFO NO. 14 -07-02 42 O O 0 0 0 0 0 0 0 0 O O O O 0 O 0 0 QUALIFICATIONS EXPERIENCE Pompano Beach Boulevard B&A was commissioned to assess & recommend improvements to Beach Bathrooms and the existing beach bathroom pavilions, part of the overall Pompano Beach Boulevard Improvement project. The Primary Objective for Beach Pavilions both beach bathrooms was is to identify current conditions and Pompano Beach, Florida provide recommendations including: 1. Upgrades for ADA and accessibility compliance; and Client: Pompano Beach CRA petting implications 2. Upgrades due to regular wear and tear as a public facility. 3. Upgrades due to weather induced deterioration (corrosion, rusting. or other material oxidation from salt air, sand, sun, etc); and 4. Improvements to architectural style and /or building vocabulary to compliment proposed architectural theme as part of the Pompano Beach Boulevard master Plan. Cha ....,. R Different designs were presented; the desired option consisting of the removal of all existing stucco veneer and replacing all walls with a new "Key west' style of painted fiber cement / stucco lap siding and trim with a fresh color palate that includes a striking blue standing seam metal roof. The (3) three existing Beach Pavilions received the some new standing metal roofs and color scheme to match the bathrooms and Kiosk establishing a consistent, exciting and unique vocabulary and beach theme for all buildings along Pompano CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14 -07-02 43 C7 QUALIFICATIONS SUBCONSULTANTS SUBCONSULTANTS CONTINUING PROFESSIONAL SERVICES I RPQ NO. I4 -07-02 44 0 O UALIFICATIONS SUBCONSULTANTS GIBBS LAND SURVEYORS G115155 LAND 5UnVMFZ5 Stephen H. Gibbs Land Surveyors is a full service Land Surveying company. Established in 1988, the firm, as well as its professional personally, are fully licensed by the State of Florida. They are a small firm of ten employs, 3 licensed Professional Surveyors and Mappers. The firm's approach means that everyone is involved. Services include: - Boundary - As -Built - Bench runs - Plat review / Platting Project Experience includes: City of Hallandale Beach - Survey Control - Horizontal and Vertical - Topographic and Route Surveys Topographic GPS Control /photo control Hydrographic / soundings Boundary Surveys Hydrographic surveying / water depth soundings City of Coral Springs - Dells / Meadows Drainage Study. Providing full Topographic Survey data, including drainage structures, swales, roads, driveways and visible utilities - currently surveying individual "basins" or design segments on an as- funded basis. These two subdivisions are the oldest in the City, and the original storm water design is failing. The survey data is providing accurate horizontal and vertical data that can also benefit the City's GIS program, providing these current as -built conditions. City of Hollywood - Providing to the City and design /civil engineers survey data, (topographic and as -built formats) for water and sewer infrastructure and treatment plants. Providing to the City, as needed, Specific Purpose Surveys in various forms: As -built and Topographic Surveys of streets and alleys for utility and drainage improvements. Currently providing horizontal and vertical as -built survey data for the Hollywood Beach Beautification Project. Specific Purpose Surveys for beach improvements, meeting the requirements of Florida Department of Environmental Protection, prepared as Coastal Construction Line Surveys or Mean High Water Line surveys, utilizing topographic and hydrographic survey disciplines. City of Miami Beach - "Beachwalk" on South Beach Location of dunes and vegetation using RTK GPS for the mapping and construction of boardwalk extensions and crossings, South Florida Water Management District - Specific Purpose Survey for litigation support, including Expert Witness Testimony, Boundary Surveys of District -owned Parcels, Topographic and As -built Surveys of Water Control Structures. Coral Ridge Properties - Boundary and Topographic Surveys for original subdivision layout, construction layout for roads and utilities. Broward County Expressway Authority - Control and Right -of -Way Surveying for construction of the Sawgross Expressway. Post - Construction hydrographic and cross sections of perimeter canals for litigation forensic study. Florida Department of Transportation - Harrison Tract Mitigation Banking - Topographic, As -built and Precise Leveling for a 200 acre crocodile habitat. Construction Monitoring and restoration mapping utilizing RTK GPS. Included in this project was topographic survey and lake soundings ( hydrographic surveying) for fill quantity and forensic study. CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14 -07 -02 45 State of Florida Department of State 37.eae �m�m.aa rrsrtvxt.`'x_r,3xxs u�v R71'EY0FS. M. e � evpama vend mb 4 a� oftle � M it i� 61mm Mai S, I Wt This ®®ic of b. avpmi a 4�3 Ilaie evW)OaeltvpNnb Pd tll(m ie iu oB ihau� a� 31.'.DK Oe n vm r ®�mtl �ryvtbCUm [aim rtpul .a SIMu idn�3 4Alt, of a vu u ruse. 1 b0u mof3 iv mC mpvmn Ou eu (kd 4ocb N UWmm c.a.r..�rerr f Ldi..S�YtY.W ras 4Mnf�ti� ". "m� Sermal} of Stale QUALIFICATIONS SUBCONSULTANTS GIBBS LAND SURVEYORS sxvm.eam urm m.•'rxounc C�..� lu�xauTVOOO U,rosrtr eau.r�.ono.nvs�in tines CONTINUING PROFESSIONAL SERVICES I RFQ NO. I4 -07-02 46 QUALIFICATIONS SUBCONSULTANTS TRC WORLDWIDE ENGINEERING �® TRC Worldwide Engineering, Inc. (TRC), founded in Fort Lauderdale in 1967 as LJenkins & Chorland, provides structural engineering services to a wide variety of WORLDWIDE ENGINEERING clients throughout the United States. The Structural Division of TRC has offices in Fort Lauderdale, Fort Myers, Fort Pierce, Jacksonville, Sarasota and Tampa FL, Atlanta GA, Nashville TN, Indianapolis IN, Dallas TX, and Scottsdale AZ, and current professional structural and support staff of over forty -nine people. In addition, TRC Worldwide Engineering has offices in Bessemer, AL, Springfield IL, Allentown and York PA. TRC is actively involved in the design of new construction and keeps current on state -of- the -art design techniques. Through knowledge of conventional construction practices, our engineers apply those techniques for a cost - effective, constructable project. With more than forty -five years structural experience, TRC has built its professional reputation on sound technical abilities, preparation of thorough contract documents, and complete contract administration services. TRC's philosophy has always been to integrate cost effective structural design solutions into the overall design process, and maintain a close client and regulatory coordination throughout the life of the project and beyond. As professional engineers, the firm endorses and follows the highest ethical standards of professional engineering principles and is proud of the professional relationships maintained with the clients who have engaged their services. In addition to "typical" structural design services, TRC established the Restoration Division in 1992 to focus on existing structures and the unique issues that are separate from new construction - issues such as the environment, particularly in coastal areas. Within the past eighteen years, TRC's Restoration staff has helped building owners from Tallahassee to Key West with resourceful, cost - effective solutions to improve and maintain their property. TRC's design professionals constantly monitor, evaluate and improve management, technology, and project delivery systems. They are known for quality control and quick response and have expertise in many complex analysis platforms such as ETABS, Ram Steel, RISA -3D, SDS /2, AutoCAD and REVIT. Rated in the top 500 by Engineering News Record, TRC prides itself in upholding the spirit of its philosophy - Service - Innovation - Quality. BUILDING STRUCTURES: Initial structural studies and economic reports; Preliminary planning and design; Final design and preparation of construction documents; Construction and threshold inspections THRESHOLD INSPECTIONS BRIDGES: Preliminary studies, design and preparation of construction documents; Construction Inspections; Structure inventory and appraisal reports CIVIL STRUCTURES: Seawalls; Water and wastewater treatment structures; Marinas and docks; Water control structures; Design and support services during construction INDIVIDUAL STRUCTURAL COMPONENTS: Component designs and drawings for manufacturers and fabricators REHABILITATION AND RECONSTRUCTION DESIGN: Historical structure rehabilitation design; Damaged structure repair design STRUCTURAL ADEQUACY INVESTIGATIONS & REPORTS Cba CONTINUING PROFESSIONAL SERVICES I RFO NO. 14-07-02 47 O O O 0 O O O O e e 0 e e e e e e e e • e e e e e • e i e e U D 75 -1;R r_1 NOrLLMDE EMWXUMNG QUALIFICATIONS SUBCONSULTANTS TRC WORLDWIDE ENGINEERING Chupco's Landing Community Center - Seminole Tribe of Florida FoR Pierce, Florida TRC Worldwide Engineering, Inc. is providing structural engineering design and contract administration on this DesignBuild 20,000 GSF, muld- purpose facility for the Seminole Tribe of Florida. The complex includes a gymnasium/concession area with retractable bleacher seating and concession kitchen, outdoor pool with an approximate 5,000 square feet pool deck, offices and conference room, and fitness center with showers, lockers and restrooms. Key Structural Components • Load bearing reinforced masonry and concrete dlt -wall panels • Open -web steel joists with metal deck roof system • Shallow concrete spread footings Design Team Architect Canaya and Associates, Architects, P.A. Contractor Stiles Construction Structural Engineer : TRC Worldwide Engineering, Inc. New Construction 20,000 GSF Construction Cost S4.3 Million CONTINUING PROFESSIONAL SERVICES I RFO NO. 14 -07 -02 48 0 O 0 0 • L n� QUALIFICATIONS SUBCONSULTANTS TRC WORLDWIDE ENGINEERING Sullivan Park Deerfield Beach, Florida TRC Worldwide Engineering, Inc. is providing structural engineering design and contract administration services on this S4.9 million park on the Intracoastal Waterway. x! Stair Tower to Bridge a Key Structural Components m % _ — ( •aw.+.T� -} .. • Restroom structure to have a pouredT -o h concrete flat slab roof on concrete columns and shallow foundations: attached shading structure is hollow — steel tubes. • Stair to Hillsboro Blvd Bridge is an all steel structure • Picnic shelter and children's play- grounds are covered with tensile fabric Restroom Facility • There are also structures at the marina, including a seawall and docks. Design Team Architect a Structural Engineer wct C Consction cost YGYEDIImE EYGIYEEYIYG Bermello, Ajamil & Partners, Inc. TRC Worldwide Engineering, Inc. $4.9 Million CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14 -07 -02 49 lV U -1;RC a WOG =E EYOMHUHNG `ba .... QUALIFICATIONS SUBCONSULTANTS TRC WORLDWIDE ENGINEERING Coconut Creek Community Center and Pavilions Coconut Creek, Florida TRC Worldwide Engineering, Inc. provided structural engineering design, contract administration and special inspections on this two-story, 36,000 square foot, multi- purpose building, detached restroom facility and pavilions. The building includes a 9,500 square foot gymnasium, lockers, showers, offices, fitness and meeting rooms. Key Structural Components Load bearing masonry walls Precast joist with composite concrete slab second floor system Metal deck and steel joist roof system Shallow concrete spread footings Many special steel joists, including curved top chards Design Team Architect Contractor Structural Engineer New Construction Construction Cost Scharf & Associates, Inc. Bluewater Builders TRC Worldwide Engineering, Inc. 36, 000 GSF $5 Million CONTINUING PROFESSIONAL SERVICES I RFQ NO. 1e -07-02 50 InI..L x 7RC MOx MDE EYGIXEEWxG QUALIFICATIONS SUBCONSULTANTS TRC WORLDWIDE ENGINEERING Pelican Soccer Complex Concession Building Cape Coral, Florida TRC Worldwide Engineering, Inc. provided structural engineering services for the construction of a new concession stand building located at the Pelican Soccer Complex. This 14 acre complex is home of the Cape Coral Cyclone Youth Soccer program for ages five to 18,a part of the Cape Coral Soccer Association. The park features four lighted soccer fields, a concession stand, restrooms, and two playgrounds for children ages 3 to 12. Key Structural Components • Primarily steel framed structure with few load bearing masonry walls to permit ample bathroom ventilation • Cast4n -place concrete countertops at service windows • Large 6 foot overhangs with a structural facia beam to support roof comers • Large exterior covered space for storm shelter Design Team Architect Architects Design Group, Inc. Structural Engineer : TRC Worldwide Engineering, Inc. New Construction 5,200 square feet of covered space Construction Cost $900,000 CONTINUING PROFESSIONAL SERVICES I RFO NO. 14 -07 -02 51 QUALIFICATIONS SUBCONSULTANTS TRC WORLDWIDE ENGINEERING CONTINUING PROFESSIONAL SERVICES I RFO NO. 14 -07-02 52 Representative Park/Recreation /Athletic Facility Projects PROJECT COST PROJECT COST U Deerfield Beach Community Center S North County Park Pool Building $ 750,000 r At Highlands Park, FL Indian River County, Florida Chupoo's Landing $4,301,500 Port St. Lucie Civic Center $25,000,000 ^ Seminole Tribe of FL. Fort Pierce Moorings Pool Deck Restoration $ 1,500,000 Roby George Park, Homestead, FL $ 3,400,000 Harbor Isle: East & West Clubhouses $ 1,500,000 Hams Field Recreation Center Florida $ 3,600,000 Hutchinson Island, Florida Homestead, Hanna Park Improvement $ 400,000 5... Ravenswood Pool Splash Park $ 1.200,000 - with Cross Over n, St. Lucie County, Florida Jacksonville, Florida Miami Dolphins Practice Field & $ 5,500,000 St. Augustine Beach Pier Pavilion $ 250,000 W Training Facility Florida Atlantic University $ 8,000,000 Fort Lauderdale, Florida - Tom Oxley Athletic Center . — Boynton Intracoastal Park $ 2,000,000 Boca Raton, Florida T'41 Boynton Beach, Florida Smithsonian Aquarium Building $ 400,000 / Coconut Creek Community Center $ 5,000,000 Vero Beach, Florida Coconut Creek, Florida Hammock Oak Park $ 500,000 WHillsborough Collier County, Florida Co. Recreation Centers $ 800,000 - 1) Country Place; 2) Carrolhvood; Each Woodmere Park, Venice, Florida $ 1,200,000 3) Woodbridge; 4) Valrico; 5) Westchase; 6) Carrolhvood Meadows Vineyards Park, Naples, Florida $ 2,300,000 Hunt Community Center $ 1,000,000 Lehigh Acres Veterans Park N/A @ AT Lopez Park, Tampa, Florida Cade Review, Lee County, Florida Northbrook Riverwalk $ 7,000,000 Bayfront Park, Sarasota, Florida $ 1,000,000 LD –with Westerly Extension Centennial Park, Lee County, Florida $ 300,000 Jacksonville, Florida L__ Gambier Park Arts Center $ 1,200.000 O Heard County Recreation Cur, GA $ 4,000,000 & Adjacent Buildings, Naples, FL Medulla Community Center $ 600,000 Alsdorf Park Boat Ramp Expansion $ 500.000 Polk County, Florida Pompano Beach, Florida East Bradenton Community Center $ 500.000 Lehigh Acres Community Park South $ 1,100,000 Manatee County, Florida Lehigh Acres, Florida UMartin County Community Center S1,000.000 Franz Ross Park, Charlotte Co, FL $ 350,000 Stuart, Florida Clam Pass Beach Facility, Naples FL $ Red Sox Training Stadium & Facility N/A 750,000 Design Review, Fort Myers, Florida North Port Multi -Use Facility, Florida $ 1,500,000 Jonathan Dickinson State Park $ 1,840,000 Blakey Park, Homestead, Florida $ 2,800,000 - Environmental Education Research Center Jupiter, Florida Manatee Park, Lee County, Florida $ 900.000 Corkscrew Swamp $ 2,500,000 South County Park – Phase II $ 350.000 Audubon Sanctuary Visitor Center Indian River County, Florida Immokalee, Florida Colonial Oaks Park, Sarasota, Florida $ 1,200.000 Collier County Park Facilities $ 2,100,000 E. Naples, N. Naples, Golden Gate, Florida Hickey Creek Mitigation Park S 500.000 Ted Thomas Windmill Park $ 4,000,000 Fort Myers, Florida Coconut Creek, Florida Bowditch Point Regional Park $ 2,500.000 Fort Myers Beach, Florida South County Regional Park Gym S 1,000,000 Charlotte County, Florida Woodmere Park, Venice, Florida $ 1,200,000 Sonesta Sanibel Tennis Stadium $ 6,000,000 Bonita Springs Recreation Center $ 1,200,000 (5000 -seat Stadium/Health Club) Bonita Springs, Florida Fort Myers, Florida CONTINUING PROFESSIONAL SERVICES I RFO NO. 14 -07-02 52 State of Florida Deparmwitt of state �.uui �..d �aarmees.m ncemoeuc E.cnvpua es... rm� mw•o en.aro�. er wir m. r.me. murex tea+. n. m. lb bama �e dIY. aepLm � {DfmOOe:l2. 0 6klmisq l Slt.d u m i,as Ien..4 m u mprm,i m6 .C.m da'.Mwa ..,..err -,.:. i:^. S -wa,), OJSta, QUALIFICATIONS SUBCONSULTANTS TRC WORLDWIDE ENGINEERING Sta rida b wrbmd m!n r4 provbbm d 5ccwe IALA'!Imko kimrw m sgir�M� mvYn �.h. puN's .bmg6 a hofmio`ed E�o`m: � Iru`dmd°v 6/pv 47t ql fl+ril. Aas<u I [,':m�]mr!nls e"Ob.�vi: ter GUc ri., NF W: Zl!]OISOWaO Cmifiin[ed Md.ol®Ibm 1)) ^. //4Ir45pC�1 �A %mr �a rn.n R - prmc -I.e a mw M.e era rs s.q. u.v I it JS CONTINUING PROFESSIONAL SERVICES I RFO NO. 14 -07-02 w k U.S. Green Building Council ; 1 Ddrek Wassink i '.4.c�U�p ..ia.LUnma f . C./6D�a>fm.aM'.acrCil'.y ru'99'-o•y�c_��1c: ._. _ O T:i`- nS6YS.:%LCT.Y.m. n..�)4�: +sII�tcp�a^� C�'dQ5¢lGO]II� 4Ti0o�Q3l:fAA✓t. �'-:S� sQUrcGF1>iTIT�dL*fAYd�.vD.'i CONTINUING PROFESSIONAL SERVICES I RFO NO. 14 -07-02 w QUALIFICATIONS SUBCONSULTANTS LOUIS J. AGUIRRE & ASSOCIATES Louis J. Aguirre & Associates, P.A. established in 1970 provide mechanical, electrical, plumbing, fire protection and telecommunication services. Louis J. Aguirre & Associates, P.A. is committed to developing sustainable designs. As a Member of U.S. Green Building Council since 2004 and with six (6) LEED® Accredited Professionals (Leadership in Energy and Environmental Design) on staff with more in the process, our firm knows its responsibility to always provide environmentally friendly Mechanical (HVAC & R / Plumbing) and Electrical designs, with a conscientious effort to minimize initial cost impact by incorporating Energy Modeling and Conservation, Life -Cycle Cost Analysis, Facilitation of Sustainable Design Systems and Equipment, Value Engineering practices, Measurement and Verification and Project Commissioning. Our realization is that all future developments will be green and that Owners, Developers, Builders and Buyers will realize that it will not only enhance their well -being but also their facility's operating cost impact in the long run. Green Buildings are Healthy Buildings. The firm has been the recipient of awards and is also an established minority- business enterprise that has had the privilege to work with outstanding Clients in many versatile industry fields throughout the years. The firm has worked with diverse entities such as parks and recreational facilities, municipal, multi -use facilities, healthcare, educational, retail /office, parking garage structures, judicial, aviation, fire stations, multi - family low /hi -rise complexes, hospitality, telecommunications, transportation, historical restorations, shopping centers, marinas, museums and exhibits. Our firm has worked on new constructions, renovations, improvements, building conversions and historical restorations. Our firm has also provided services under the roles of Building Code Compliance Inspectors /Reviewers and Design Criteria Professionals. MECHANICAL ENGINEERING HVAC: • Air Conditioning Systems • Heating Systems • Ventilation Systems • Smoke Management /Control Systems • Central Chilled Water Plants & Distribution Systems • Central Hot Water Heating Plants & Distribution Systems • Building Management and Automation Systems PLUMBING: • Sanitary and Storm Water Drainage Systems • Domestic water - Cold and Hot Systems • Hot water and Steam Boilers • Natural and LP Gas • Fuel storage and piping • Medical Gases • Compressed Air FIRE PROTECTION • Automatic Fire Sprinkler Systems - Wet, Dry and Pre - Action • Automatic Fire Suppression Systems - Wet and Dry • Automatic Gaseous Fire Suppression System - Inergen ELECTRICAL ENGINEERING • Power Generation - Normal and Emergency • Uninterruptible Power Supplies • Power Distribution - Normal and Emergency • Short Circuit Analysis • Time Current Coordination Studies • Building Lighting Systems - Normal and Emergency • Site, Roadway, Sports and Specialty Lighting Systems • Lightning Protection • Automatic Fire Alarm and Detection Systems • Information Technology Systems - Data, Voice. Video • Public Address and Sound Systems • Security Systems - Building Access and CCTV RELATED SERVICES • Feasibility Studies • Life Cycle Cost Analysis • Value Engineering • Code Compliance Construction Documents Review • Code Compliance Construction Surveys • Sustainability • Building Commissioning Cba _.,_y,„•. CONTINUING PROFESSIONAL SERVICES I RFQ NO. I4 -07 -02 54 O O 0 O O O O O O O O O O 0 • QUALIFICATIONS LJ SUBCONSULTANTS LOUIS J. AGUIRRE & ASSOCIATES City of Miami Design -Build Gibson Park Renovations and Modifications TYPE OF FACILITY /SERVICES: PARKS AND RECREATIONAL FACILITY Mechanical (HVAC, Plumbing & F /P) Consultants PROJECTED BUDGET: $ 9.4 Million PROJECT START DATE: 2009 PROJECT COMPLETION DATE: 2012 Project Description: The Afro- Coribbean style park located at 401 NW 12°1 Street. Miami will be undergoing a face -lift in order to provide recreationalpeisure services and expectations while preserving the cultural influences throughout the community. ••" 1 "c The project's site plan was designed to meet the program requirements within a strict limited space and shag be carried out in two (2) separate chases and scope =ti of work wig include 1,000 covered stadium bleachers. press box with ADA accessible elevator and P.A. system, central pavilion and bandstand, playground areas with artificial turf, an 11.162 sq. ft. 50 -meter Mane competition swimming pool area, water activity pool, pool house• green sports field with new fighting - system, community center. gymnasium, library building, picric pavilions. new r� electrical generator and chiner yard, renovated parking lots areas and fitness j_ support spaces. The project is also being designed and will be processed through - - the Silver LEEDS rating certification processes. _ } - The Phase I will involve an the site work (parking area. read access. etc.), multi - 1 purpose ban field with a 372' x 172' playing area, bleacher seating with a total _ capacity of 1,500 seats, a 2,500 sq. ft. Tot lot area, open play area, outdoor fitness - - care equipment. site fumishings /amenities, a new 11.162 sq. H. competition pool, a 1.096 sq. ft. Tot pool, a 2.000 sq. ft. pool equipment building, a 6,491 sq. H. community building. a 4.320 sq. ft. library renovation and dumpster enclosure. The Phase II will involve a new 15,200 sq. ft. Sports Budding consisting of gymnasium. bowling center (2.500 sq. ft.) and concession stand. Some of these resourceful equipments will include the HVAC equipment which will be highly energy - efficient refrigerant - friendly, water efficient plumbing futures. automated shutoff faucets. solar hot water heaters. fire sprinkler systems will be hydraulicolly calculated, state -of -the art control filtration and treatment system for the pool areas. recirculation pumps and many other features. Our firm is providing the Mechanical (HVAC, Pkimbing and F/P) portions of the scope of work. LOUIS J. AGUIRRE & ASSOCIATES, P.A. X06- ^� Consulting Engineers fit• C' bar e.- r....a.a CONTINUING PROFESSIONAL SERVICES I RFO NO. 14 -07-02 M 4) 0 O • e 0 • • QUALIFICATIONS SUBCONSULTANTS LOUIS J. AGUIRRE & ASSOCIATES New Marlins Stadium Site Parking Garage TYPE OF FACILITY /SERVICES: PROJECT COST: PROJECT START DATE: 1 ]:Zi71 �� td�791 17 L [�7 7 rZ\ 171 �v Project Descripffon: MUNICIPAL FACILITY Mechanical /Electrical Consultants $ 74 Million 2009 2012 Louis J. Aguirre 8 Associates, P.A. in collaboration with Leo A. Doty were commissioned by the City of Miami to provide the Mechanical /Electrical Engineering Services including Fie Protection services towards the design of the new stadium site poring structure that wil house the future games of the Fonda Martin baseball team. The new Stadium Site Parking infrastructure and surface lots are situated within the firnits of the fomgily occupied Orange Bowl Stadium which is bound by NW 7th Street to the north. NW 3rd Street to the south, NW 17th Avenue to the west and NW 14th Avenue. Our firm provided the master plans towards the design and construction of four (4) mulfNevel parking vehicle structures (Pl. P2. P3 and P4) and six (6) parking lot surfaces located within the east and west of the parking site. The parsing garages and parking lot surfaces contain on approximate total of 5,716 vehicle parking spaces Including ADA accessible palling spaces that also included parking spaces for future residential facing. In addition to the parking garage structures, an approximate 63,950 sf of retail space (infrastructure only) is located within the ground floors of three (3) of the parking garages. The sir (6) paved and lighted parking surfaces (WI. W2, W3, El, E2 and E3) contains an approximate 862 parking spaces located within various city owned parcels along the east and west sides of the parking site. The mixed-use garages me designed to provide a transition of scale from the close vicinity neighborhood (to the South) to the ba 1park (to the North). Each parking structure features one Central Lighting Control System, secured from unauthorized use or tampering. The Lighting Control utilizes natural fighting inside the garage and along its perimeter for daylight harvesting purposes by use of photocells. Sustainob3ty, was the nature of the project therefore. LEER® design process and initiative was approached for the entire project. The Martino Ballpark was comnssioned and finished in March 2012. The fast game was played in April of 2012. Our firm will be providing the required schematic design plom, master site plans, schedules, calculations, construction documents and construction supervision for the electrical and mechanical systems in compliance with ail the Miami -Dade County and Florida Building Codes and Standards in place. Mechanical Systems include Heating Ventilation, HVAC. Plumbing and Fire Protection. Electrical Systems include Electrical Service R Power Distribution, Lighting System, Telephone System. Security System and Lightning Protection. LOUIS J. AGUIRRE ®SOCIATES, P.A. 1VVV 1��� Consulting Englneers Cba CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14-07-02 56 O O O O O O O O O O O O O O 0 0 e s O s S U QUALIFICATIONS SUBCONSULTANTS LOUIS J. AGUIRRE & ASSOCIATES CITY OF MIAMI New Clubhouse / Restaurant for Melreese Golf Course TYPE OF FACILITY /SERVICES: PARKS AND RECREATIONAL FACILITY Mechanical /Electrical Consultants PROJECTED BUDGET: $ 4.6 Million PROJECT START DATE: 2008 PROJECT COMPLETION DATE: 2010 Project Dewrlpflon: The Project consisted of the design and construction of a new clubhouse and restaurant facility with adjacent tennis courts and related site improvements includng a golf can area, surface parking, utilities and receivi g/loadng area. The rotor square footage area of this facility is approximately 21,530 square feet, �► •..'Y' rd elevated opproximotely 3 feet above the existing grade level to maximize the view of the golf course. The Tennis Courts added an approximate area of 7,200 square feet. The complex will accommodate a pro shop with ancillary space, men's and women's lockers, restaurant and banquet facility for 200 patrons including a full commercial kitchen to serve the restaurant and facilitate catering events; in addition, the dning area includes a separate bar with seating capacity for approximately 15 to 20 patrons. Administrative support offices and service areas are induced in the project. The clubhouse will also include a courtyard with open and covered areas that can enhance the doting experience to include outdoor doting far larger banquet events. The construction took place in two phases. with phase 1 having the existing facility remain operational during construction while the new clubhouse was underway; and phase 2, having the two tennis courts and the remaining site improvements commenced upon the completion of the new building. The new Clubhouse / Restaurant project at Melreese Golf Course for the City of Miami has been registered with US Green Building Council (USGBC) with a sustainable gool of LEEDO Silver that has been approved and is currently awaiting commissioning clocumentotlon. The project will become the first City of Miami owned project to be LEEDS Certified Silver rating. Our firm provided the Mechanical, Electrical, Plumbing and Fie Protection Engineering Services. The nature of the firm's responsibility included engineering design, cost estimating. specifications. shop drawings. field reports. construction documentation preparation, products research and construction administration. Iq LOUIS J. AGUIRRE & ASSOCIATES, P.A. Consulting Engineers CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14 -07-02 57 State of Florida Department of State 1 ¢tiff 4m �-6 al muL IS L AG1IM& A55(IClAlkS.IAU�mlwmuP Jv�b Ne M�NO[Sa[M IDS ht�® mmEa cl0e oalvvim a LWflS. IfvS twlJ mwo lmiaam WPl 41 fm M1c mn W— mu¢b fl L JI.:01l,q�m ®�¢m mW�gvtSalumy ®rtym 1fuW«muff Wu vilmpam Enm r.W An ofpimL®. s.�sr <ssr Mfl.:f. S(frewy O1f'.StQ 4ssr��a.�rr QUALIFICATIONS SUBCONSULTANTS LOUIS J. AGUIRRE & ASSOCIATES Sta e bYbO.md undo. dl i b Cb Pbrk thro haI U=2R8R015 Nc 2 212 01 5 015 2 1 lorida PA. G 4 bn ! Cba CONTINUING PROFESSIONAL SERVICES I RFQ NO. I4 -07 -02 58 QUALIFICATIONS L/ SUBCONSULTANTS E SCIENCES E Sciences, Incorporated (E Sciences) is an environmental, engineering and a�SC en ecological consulting firm providing a wide range of services to clients in both the public and private sectors. Our company was formed in 2000, bringing together a team of professional and technical staff members with a long history of successfully executing projects throughout Florida and the Southeastern United States. Our fundamental philosophy is based on responsiveness, expertise and creating value for our clients. E Sciences delivers strong project management, comprehensive multi - disciplinary services, knowledge of specific regional issues, relevant experience, and dedication to technical excellence. This expertise qualifies us as leaders in our field. We understand the challenges facing private companies and government agencies, including scheduling constraints and shrinking budgets, and we respond by structuring our project teams to deliver high value and excellent service. For the Boyside Park project, E Sciences will be providing ecological services. Our ecological staff includes full -time senior environmental scientists with degrees in soil and water science, ecology, biology, earth science, and marine biology. Marine and Coastal Ecology E Sciences will provide assistance with sensitive marine ecosystems, including environmental issues related to development, redevelopment, coastal research, and restoration of marine environments, including permitting, surveys, assessments and monitoring: Permitting - Local (Class I), State and Federal (Environmental Resource, Sovereign Submerged Lands, Coastal Construction Control Line(; benthic surveys, including seagrosses, oysters, corals, sponges and other marine invertebrates; water quality monitoring; mangrove surveys and permitting; sediment characterization and dredging (Vibrocore, ponar and bioassay testing); manatee observation; creation of site - specific manatee protection plans; natural and artificial reef surveys and monitoring; aquatic species surveys; essential fish habitat assessments (NEPA and NMFS); sea turtle alternative lighting; and assistance with Green Morino practices. Natural Systems Analysis E Sciences ecologists and biologists will provide resource assessment and inventory services for public agencies managing public lands or tasked with inventorying and addressing natural resources, as well as private landowners seeking valuation of various ecological services their land can provides such as water quality improvement and nutrient removal, carbon sequestration, and endangered /threatened species conservation. E Sciences scientists and GIS technicians are highly skilled in the use of GIS and GPS technologies to conduct natural resource inventorying and analysis such as canopy studies, nuisance and exotic species mapping, native habitat mapping, historical land use changes, wildlife census and surveying, and long -term ecological community structural changes. E Sciences has recently conducted studies within North Bay Village and its vicinity. We are currently conducting emergency water quality sampling for a sewer discharge in North Bay Village. E Sciences has also done a number of recent projects in Normandy Shores, including'tree inventories, groundwater monitoring and a sea level rise study. Cba CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14 -07-02 59 O O O O O O O O O O O • B e • B e QUALIFICATIONS SUBCONSULTANTS E SCIENCES City of Miami Beach Environmental Engineering Continuing Services Client City of Miami Beach Project Dales August 2011 - Ongoing County Miami -Dade Description E Sciences was awarded a contract with the City of Miami Beach to conduct environmental engineering services. To date, E Sciences has provided the City with the following services: Spill Prevention Control and Countermeasure (SPCC) Plans — E Sciences prepared SPCC Plans for 12 facilities throughout Miami Beach. These facilities included pump stations, fire stations, public works yard, Miami Beach Golf Club and the Convention Center. E Sciences' approach for performing the SPCC Plans) required under this contract followed the steps outfined in applicable federal regulations (40 CFR 112). We conducted the following activities to obtain the information required to complete the Tier I SPCC Plan: • Review available as -built drawings, surveys and plans related to the structures and drainage pathways • Conduct a site visit of each facility with a person knowledgeable of the facilites tank systems, coordinated through the City's Environmental Department • Interview the site manager or other personnel familiar with the tank systems and other oil storage systems • Review records of previous spills • Evaluate topography and surface water flow regimes • Evaluate areas of obvious discharge potential and spill sources • Identify environmentally sensitive areas and potential receptors if a spill were to occur • Document security measures to prevent unauthorized access to oil handling • Develop a list of emergency response personnel • Review the Citys spill response measures • Review records of tank integrity and pressure tests • Review the C tys personnel training records The above information was used to complete the Tier I SPCC Plan for each facility. The Plan was reviewed and certified by an E Sciences Professional Engineer. We also incorporated recommendations to assist the City with compliance with state regulations. Green Waste Facility — This site is an undeveloped, bermed area located on the east side of the Miami Beach Golf Club. The site was previously used by the City of Miami Beach for solid waste management and a portion of the area contained buried debris. In anticipation of constructing the wastewater reclamation facility, the City implemented a material screening plan to remove the buried solid waste and screen out the larger (greater than 2inches) pieces of solid waste for off -site disposal. The recovered screened material (RSM) was merged with a berm around the solid waste handling area to separate it from adjacent properties and the golf course. The larger pieces of debris removed consisted primarily of rods, concrete and wood debris. Miami -Dade Department of Environmental Resource Management (DERM) (currently Permitting, Environment and Regulatory Affairs - PERA) required the City to demonstrate that there was a minimum of two feet of dean fill or other engineering control in place covering areas of solid waste in or around the berm in order pursue regulatory closure for the site. If _ ee R_' 84 201. I'M -,; r 0ar1 -e0- N& CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14 -07 -02 EEO 0 0 O O O O O e e 0 0 • e 0 e 0 e • 0 • 0 e • • e • • QUALIFICATIONS SUBCONSULTANTS E SCIENCES E Sciences conducted environmental services to provide the City with guidance on whether it can be demonstrated that there was two feet of dean fill covering the berm. In order to complete the project in a time and cost effective manner, E Sciences developed a phased sampling approach by collecting all the necessary samples, but conducting laboratory analysis on an iterative basis. The limited initial sampling results revealed the presence of regulated contaminants above regulatory criteria, therefore additional analysis was not deemed necessary. The City is currently proposing to implement an engineering control (EC) to achieve conditional site closure along with the adjacent golf course property, protect human health and the environment. E Sciences is completing the engineering control design and coordinating review and approval with PERA. We are including options for re -using unwanted, dean fill materials or recycled materials from other places within the City as part of the engineering control system. The proposed engineering control will consist of the installation of an impermeable geosynthetic day liner (GCL) and filUsod system over the RSM berth. Furthermore, E Sciences is facilitating guidance and recommendation for the installation of the GCL cover to the City and will provide site oversight during construction in order to verify the proper installation of the cover and handling of the contaminated soil. Upon completion of the aver installation, E Sciences will submit as -built drawings and cross-sec tons documenting the constructed condition of the berm to PERA. Additionally, E Sciences will prepare and submit an inspection, monitoring and maintenance plan for the EC. Sea Level Pose Evaluation — E Sciences is conducting a study of groundwater elevations, tidal fluctuations and rainfall over a period of seven months to help the City to evaluate the effects of sea level rise. To identify areas of potential short and long term flooding, we are creating ISIS layers of surface water levels from high quality LiDAR data, groundwater levels from wells, and other research conducted. The critical component of the effort is to identify areas with limited soil storage capacity, and areas where sea level rise is expected to reduce unsaturated soil storage capacity further. These data will be contoured to provide a spatial presentation of areas with higher vulnerability for impacts of sea level rise through groundwater. A letter report ouflining our methodology, the results of the study in narrative, charts and graphics, and recommendations will be provided at the completion of the study. We will work with City staff to develop a plan for future "armoring" and creating resiliency of the City's stormwater system and other infrastructure as requested. Street Tree Inventory — E Sciences conducted street tree inventories for the Normandy Shores and Normandy Isles neighborhoods. A total of 6,010 trees were inventories using sub -meter GPS and provided to the City in an ESRI ArcGIS shape file. The work included assessing each tree for its general condition and providing recommendations for maintenance. Greenspace Canopy Assessment — Using i -Tree Canopy and i -Tree Vue, E Sciences assessed the extent of the Citys urban forest canopy and the ecological services provided by the trees. E Sciences estimated the canopy coverage for the City's entire urban forest, its parks and its rights of way using ~Tree Canopy. It also estimated the percentage of available space remaining within the City for additional tree planting. Using i -Tree Vue, calculations were made to estimate the carbon sequestration and storage, as well as pollutant removal being provided by the trees. E Sciences developed a brochure for public education documenting the information from the study. I pCQ6 lie, E = I n000 .00 P: olECi 7 -OU. hCI CONTINUING PROFESSIONAL SERVICES I RFO NO. 14 -07 -02 61 QUALIFICATIONS SUBCONSULTANTS E SCIENCES Overseas Highway Client HDR Engineering for the Florida Department of Transportation District Sic Project Dates July 2012- Ongoing County Monroe Description E Sciences, Incorporated (E Sciences), as a suboonsultant to HDR Engineering, Inc., is providing assistance with the environmental, drainage and permitting services required on the Overseas Highway roadway improvements from north of Old SR-4A/MM 77.5 to Jerome Avenue/MM 81.41 located in Monroe County, Florida. E Sciences conducted the wetland and listed species survey for the project corridor. Mangroves, forested area and beach are located adjacent to the project corridor and portions of the corridor cross over or are adjacent to waters of the Florida Keys National Marine Sanctuary ( FKNMS). These waters are designated as an Outstanding Florida Water (OFW), and as such are afforded special projection. Numerous protected species utilize the FKNMS upland and offshore habitats in the project vicinity. Due to the nature of the project (i.e., milling and resurfacing; addition of bike lanes in uplands; restoration of existing bike paths; pavement markings), no direct wetland or fisted species impacts are expected as a result of the project However, special attention to the surface water pollution prevention plan (SWPPP) and erosion control plan (ECP) will be required to ensure impacts to the FKNMS are avoided. E Sciences is working with the project engineer to avoid wetland impacts. This includes providing specific items, such as dearly delineating areas which cannot be used for storage of equipment or materials; and instructions for preventing any materials from bridge work falling into the water to ensure inadvertent impacts do not occur. ._ SCe"C M I Re. 8i A-14 F -001 U6 0va:eds Hyh,,, Ir 008-1 QC I: 3a.... - . MYE _ - a � - CONTINUING PROFESSIONAL SERVICES I RFO NO. 14 -07-02 62 �11 QUALIFICATIONS LJ SUBCONSULTANTS E SCIENCES Continuing Contract for General Environmental Engineering Client City of Fort Lauderdale Project Date(s) June 2008 - Ongoing County Broward Description E Sciences was awarded a contract with the City of Fort Lauderdale (City) to provide ongoing environmental engineering support during two separate consultant selection processes. The scope of the contract is broad and provided us with a wide range of opportunities to support the City. The following summarizes some of the projects that we completed for the City: Sistrunk Boulevard: E Sciences was hired by the City to conduct soil and groundwater testing along Sistrunk Boulevard from 1 -95 to Andrews Avenue. The project was conducted in order to support the CRA with implementing a streetscape and enhancement project. E Sciences conducted soil and groundwater testing at 36 locations to evaluate potential impacts to construction that may arise due to known contaminated sites historically located along the corridor. Potential sites of concern included historical dry cleaners, gasoline stations, junk yards and an incinerator ash landfill. Prior to implementation, E Sciences worked with the Florida Department of Transportation (FDOT) to determine a scope of analytical services_ E Sciences reconciled the proposed subsurface structure locations (drainage structures, light fixtures, etc.) identified on construction plan sheets with the existing corridor conditions and proximity to potentially contaminated areas. Due to the high number of utilities anticipated to be located in dose proximity to the drilling locations, E Sciences engaged a private utility location contractor to locate underground utilities using ground penetrating radar and electromagnetic radiation surveys, in addition to review of City plans and coordination with Sunshine One Call. A Maintenance of Traffic (MOT) plan was prepared and submitted to the City prior to field activities. In addition to an assessment report, E Sciences provided general notes and bidding specifications language outlining requirements for managing contaminated soils and groundwater to be incorporated into the bidding and contract documents for this project. During construction, we assisted the City in working with the contractor to minimize impacts to construction and keep the project moving. This 'stimulus' project meant that deadlines were critical and that the work needed to be expedited. We developed a scope of work, met with FDOT to negotiate the scope, conducted private utility location, developed a MOT plan, and initiated the sample collection within 13 days of the first phone call. Our draft report was provided to the Community Redevelopment Agency (CRA) within an additional 12 working days. This project was completed to the satisfaction of the CRA and FDOT and we delivered the project under budget by more than $12,000. Fire Station #49: This project was undergoing redevelopment with a new City fire station when petroleum contamination was discovered during construction. E Sciences mobilized to the site the same day as requested to further investigate the implications of this finding on construction and regulatory notification. Historical and regulatory records indicated historic Underground Storage Tanks (USTs) on the property. Consultation with regulatory agencies, collection of soil and groundwater samples and sound environmental judgment allowed this project to proceed with minimal time delay and costs to the project. E Sciences also conducted air monitoring for construction workers to evaluate potential health implications of exposure to the —�� unknown products discovered and provide the City with such documentation. �csci was Pml.r. I C,:; cl fort Gi nciar En, wane nlal Enomeenny ( &Ca`bn OVERt9 p.N i:Gl CONTINUING PROFESSIONAL SERVICES I RFO NO. I4 -07-02 63 0 O 0 0 0 O 11 s O O B • B • • 0 e QUALIFICATIONS SUBCONSULTANTS E SCIENCES United States Department of Housing and Urban Development (HUD) Environmental Documentation and Area -wide Floodplain Management Eight-Step Decision - Making Process: To enhance the quality of life in our neighborhoods, the Fort Lauderdale City Commission has established four Community Investment Programs: the Neighborhood Community Investment Program (NCIP), the Neighborhood Community Investment Grant Program (NCIGP), the Business Community Investment Program (BCIP), and the Business Community Investment Grant Program (BCIGP). The goal of these programs is to provide matching grant funds for the construction of community improvements in the City's right-of -ways that beautify neighborhoods and enhance the quality of fife for those who live, work, and visit the City of Fort Lauderdale. The majority of individual actions considered for these projects include the following: street name decorative posts, entryway monuments, entryway signs, concrete curbing, swales, sidewalks, median islands, decorative lighting, solar decorative lighting, landscape lighting, trees, landscaping, and irrigation. E Sciences has prepared numerous environmental documentation packages to support HUD funding for the City of Fort Lauderdale's neighborhood improvement projects. The majority of these involved the preparation of Environmental Checklists in compliance with HUD regulations. E Sciences also prepared an Area wide Floodplain Management Eight -Step Decision- Making Process for them to utilize when projects are located within a I00-year floodplain as defined by the Federal Emergency Management Agency. Progresso Village Neighborhood: E Sciences conducted a Phase I Environmental Site Assessment (ESA) for the City's Neighborhood Services group in order to support application for federal funding for decorative entranceway signs. Hortt Elementary: E Sciences conducted a Phase I and Phase II ESA for the City to support their purchase of this school property intended for redevelopment as a neighborhood park. This property was initially developed by Mr. MA. Hortt who was one of the early Fort Lauderdale settlers. The project was expedited to meet the constraints of contract timing. Twin Lakes: E Sciences conducted a Phase I ESA and asbestos survey to support the Cqs purchase and redevelopment of this residence as a park. Fort Lauderdale Low Level Bridges: E Sciences provided asbestos surveys in anticipation of demolition and reconstruction of three low level neighborhood bridges for the City: The Harborage, Marcetta River, and Carlotta River. These reports met the requirements for FDOT, as FDOT was providing funding for this project. Fire Station tl46: E Sciences was contracted with the City to provide an indoor air quality survey to evaluate comfort- related issues posed by building occupants regarding indoor air quality. The scope of services included a walkthrough of the building; interviews with building occupants; observations of the air conditioning systems; measurements for temperature, relative humidity, carbon monoxide, and carbon dioxide in each building area; and moisture readings in areas where either visible indications of moisture impact were noted or that were reported by building occupants. Sailboat Bend Preserve: E Sciences was hired by the City to conduct a Phase I and II ESA of vacant property being designated for use as recreational space and installation of a 'tot lot'. The property is adjacent to the City's public works and police department complex. No environmental concerns were identified. Parcel Located at 538 NW 9th Avenue: E Sciences was engaged by the City's CRA to conduct a Phase I ESA of this property, located across the street from the CRA building. This vacant lot was being procured by the CRA as part of an assemblage of parcels for future development opportunities along Sistrunk Boulevard. Sclemes Nee E =2014 r'O"Cl D!. 6 F n9 I nuucrcale rx• n og [ C, 0,"mw 1? 0.1331 OVE Rb IEV.' NC-1 CONTINUING PROFESSIONAL SERVICES I RFO NO. 14 -07-W 0 t' c 5ei maa __Q!1� QUALIFICATIONS SUBCONSULTANTS E SCIENCES Vizcaya Southern Lagoon & Northern Canal Tidal Swamp Landscape Environmental Restoration Client Miami -Dade County, Vizcaya Museum and Gardens Trust Project Date(s) January 2012 - Ongoing Project County MiamFDade Description Vizcaya Gardens and Museum, built in 1915 by Industrialist James Deering, was acquired in 1952 by Miami -Dade County and is a US Historic National Landmark site. Devastation from Hurricanes Wilma and Katrina in 2005 wreaked havoc on the gardens and grounds, designed for Deering by the Columbian Landscape Architect Diego Suarez, resulting in debris and sedimentation blockages in the canal and tidal pond system that connects to Biscayne Bay. Nuisance and exotic species infestations, and declining water quality from a loss of tidal flushing has resulted in a loss of fish and wading bird usage of the gardens and waterways. Rare coastal hammock hardwood forest habitat was also destroyed. E Sciences is formulated a multidisciplinary landscape architecture and environmental restoration plan for the waterways and tidal pool which balances ecological function with creative landscape aesthetics, recreational functions and values, and improvements to water quality, and planting designs based on historic flora inventories — including mangroves, native hardwood hammock and coastal scrub species. E Sciences developed design plans to dredge the south canal at Vizcaya. A collapsed retaining wall at the mouth of the south canal, in addition to encroachment of mangroves and other emergent wetland vegetation, through the deposition of organic material and the capturing of sediments by their roots, has resulted in interruptions to the intended tidal fluctuations within the canal. E Sciences applied for a Class I Permit from MiamiDade County Regulatory and Economic Resources (RER) Department), a permit exemption from the Florida Department of Environmental Protection (FDEP) and a Letter of Permission (LOP) from the U.S. Army Corp of Engineers (USACE) to conduct maintenance dredging activities involving the removal of approximately 1,410 cubic yards of silt and sediments from the bottom of the canal. The objective of this project is to enhance and restore lost hydrologic and biological functions to the canal. Fa, E- 2014 Nq-.:N" i 0091 Oil; CONTINUING PROFESSIONAL SERVICES I RFO NO. 14 -07-02 65 State of Florida Department of State Imu(1fim R.r�MMWU� tlmlSCILtiRS, I�NEPoEATkDe • mpmtm apvml mds 0e h�� o!!e Sme of F1viL (b1 m Auryv 1L�m� omh+MOUmR +�TUPIR¢OIISV. Jfi�'v mtifJ pv tie �.am e., o.la.orm n�melr E�oyh .a fi6t m laml :, bIJ, W b e>m o uti�t. 1 fimin amiM1 Wv ui! �P+ =a� Cu m (IM Anr4s NDii:olurm. 3nlyrS�./nti� �Yi.mn. wr [7itwY .Sn�/IpyA�r�. nrJ Sffr[faI}'Of$!rt![ QUALIFICATIONS SUBCONSULTANTS E SCIENCES State: 'o;Ff Flom c 6 a.®1 de w s I m d. ;� d.m a Pef."[n& :e: i&1IL1?111 � Mmie _ap. .m 47L nm&igs,.:m.� s=,stm RAZE Of Rd VI. pIDIAY.V PEOIAPED BY IAY t CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14 -07-02 66 r QUALIFICATIONS SUBCONSULTANTS TRAF TECH Traf Tech Engineering, Inc. is an engineering consulting firm specializing in traffic TNdf Tech engineering, parking studies, traffic impact studies, pedestrian studies, access ENGINEERING, INC. evaluation, traffic circulation patterns, traffic concurrency, Development of Regional Impacts (DRI), and signal warrant studies. ® The firm has provided the following traffic engineering services to numerous South Florida Municipalities: ® - Review traffic studies on behalf of municipalities - Review site plans (access, parking layout, internal site circulation) ® - Review Development of Regional Impacts on behalf of municipalities - Signal warrant studies e - Pedestrian management studies e - Parking studies • - Safety studies - Traffic concurrency e - Intersection studies (determined improvement needs to improve traffic flow and safety) e - Arterial studies - Traffic calming U O e 0 e bra ...R e S CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14 -07-02 67 B 0 0 O e e 0 • QUALIFICATIONS SUBCONSULTANTS TRAF TECH BBBT ARENA, Sunrise Florida Client City of Sunrise 10770 West Oakland Park Boulevard Sunrise, Florida 33351 Project Commencement — 2010 Project Completion — 2012 Project Description Developed a signing, access, and parking management plan for both the former Bank Atlantic Center (now BBBT Arena, a.k.a Panthers Arena in Sunrise) and the Sawgrass Mills Mall in order to minimize pedestrians crossing Panther Parkway post and pre - events at the arena, reduce traffic backups from the arena onto NW 136`" Avenue, and relief parking usage at the mall by arena patrons. The plan developed by Traf Tech Engineering was endorsed and tested by the City of Sunrise, the arena, and the Sawgrass Mills Mall. Cba .... Traf Tech ENGINEERING, INC. CONTINUING PROFESSIONAL SERVICES I REG NO. I4 -07 -02 LY t U, QUALIFICATIONS SUBCONSULTANTS TRAF TECH COVE SHOPPING CENTER, Deerfield Beach, Florida Client City of Deerfield Beach 150 NE 2n° Avenue Deerfield Beach, Florida 33441 Project Commencement - 2013 Project Completion - On Going Project Description As a subconsultant to Chen Moore and Associates, Traf Tech Engineering, Inc. is currently conducting a parking utilization study at the existing Cove Shopping Center located on the south side of Hillsboro Boulevard just west of the Intracoastal Waterway in the City of Deerfield Beach, Florida. This study is being conducted for the City of Deerfield Beach. The purpose of the study is to document the number of beach patrons that park illegally at the Cove Shopping Center in order to access the beach areas due to perceived parking shortages at the beach. A potential parking solution will be identified that will discourage beach parking at a private commercial development. Cba ...._ r.. a. k Traf Tech ENGINEERING. INC. CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14 -07 -02 69 B O TIONS SUBCONSULTANTS TRAF TECH OTHER RELEVANT EXPERIENCE Improved Access for Southeast Miramar Traf Tech conducted a preliminary evaluation of three potential roadway improvements located in southeast Miramar. The three roadway improvements were intended to improve access and mobility within the southeast areas of the City of Miramar. Additionally, the current and future traffic conditions along Flamingo Road /Ludlam Road, south of the Miami- Dade /Broward County line, were reviewed since this north -south roadway provides an alternative exit route to current and future residents of southeast Miramar. Traffic Analysis for Transit Oriented Development in the City of Miramar Traf Tech conducted a preliminary traffic analysis in connection with proposed land -use changes for an area located near State Road 7 in the City of Miramar. This analysis was based on the current edition of the Institute of Transportation Engineer's (ITE), and followed Broward County procedures regarding existing conditions, and future conditions with and without the proposed land use change The future conditions analysis focused on the shortand long -term horizon years. The analysis determined the addition /decrease in daily and PM peak hour traffic volumes within the affected roadways. The analysis was based on readily - available traffic information published by Broward. Traffic Consultant for the City of Sunrise As traffic consultant to the City of Sunrise, Traf Tech assisted the City in addressing the pedestrian traffic between the Sawgrass Mills Mall and the Florida Panther's Arena. Furthermore, Traf Tech Engineering has been involved in the review process of numerous applications submitted to the City of Sunrise. These reviews have focused on traffic impacts created by the proposed projects, and site plan reviews. Traffic Consultant for the City of Coral Springs As traffic consultant to the City of Coral Springs, Traf Tech assisted the City in pursuing the future extension of University Drive between north -west Broward County and south -west Palm Beach County. Furthermore, Traf Tech Engineering has been involved in the review process of numerous applications submitted to the City of Coral Springs, including the future Downtown Coral Springs mixed -use development. These reviews have focused on traffic impacts created by the proposed projects, and site plan reviews. Pompano Beach Plaza Master Plan Trot Tech Engineering was retained by the City of Pompano Beach to conduct a parking study in connection with the Pompano Beach Plaza Master Plan project. The project study area was generally bounded by: - Atlantic Ocean on the east - Intersection of SR A] A & N. Pompano Beach Blvd. on north - Intracoastal Waterways on the west - Atlantic Boulevard on the south The parking study addressed the existing public parking facilities located within the study area, the existing parking demand of these public parking facilities, the future parking needs of the study area, and recommendations intended to improve parking conditions in connection with the Pompano Beach Plaza Master Plan project. Traffic Consultant to FDOT For a period of 10 years, Mr. Vargas served as traffic operations and safety consultant to the Florida Department of Transportation (FDOT). During this period, he conducted over 200 traffic engineering assignments for the State, including the Florida Keys Hurricane Evacuation Study completed in 2001. The over 200 work orders have included, but are not limited to: - Signal warrant studies - Intersection studies - Access management studies. - Operational analyses of arterial roadways - Safety studies at more than 100 locations - Operational analysis for a new flyover ramp proposed at the Golden Glades interchange. CONTINUING PROFESSIONAL SERVICES I RFO NO. 14-07-02 70 State of Florida Department of State I ¢rvf) b®Ne • ®da N W�+olfc Wu TRA! TkCll L GI \fiW- mpmpm gpmml udv q� 4�� of Nt SUCOf FlaiE� (IN m Aurye P.:WS, elfau.e Amu 6:W5. Re Oar ®mm� >Rn u+i°nino WNNIW9]:. Ifmha 3 1 6e vil mivum 4v ptl Llfm Jm WUtlf WuQE l7¢� )1, . - m ®rtcm amW rtprtmifvm L� ®rtfm .a Gel m APN Y 1. mt 1 finha muff Ru oN mum Ea m fb] Aniafa of QmWia rr�/��bMK aff Srrrewy ojStm C� YnsA�l•w.,...� QUALIFICATIONS SUBCONSULTANTS TRAF TECH �oaiL -uf TRAF YuO�mI Olv Ye f ' YM I�.�•Mm4vl [.p Cert i6 Ebu.ron: rrurso,� AIbi NO" j}lIDl]CIl9 ' 4 - .4 ng,.11 c - r Vv C1i/trr III. fLil� Smsu Of AuthOnZ2tiOD - - . aIYS CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14 -07 -02 71 • • • • e 0 • • • e • • • s • • • • • • • • • • • • • QUALIFICATIONS SUBCONSULTANTS CMS- CONSTUCTION MANAGEMENT SERVICES C CMS - Construction Management Services, Inc.'s (CMS) team Ys CONSFIvcrmnrn AGEMENrsERWIMIEa,PIC is an unusual blend of technical talents - unique to both the Architectural /Engineering and General Contracting professions of today. For over thirty -five years, Keith Emery, owner and founder of CMS, has been providing Cost Consulting /Cost Estimating /Cost Control, Value Engineering, Construction /Program Management, Owner's Representative Services, Scheduling, Contract Administration, Expert Witness Services, and Construction Inspections to both public and private sectors throughout State of Florida. Since its inception in 1976 and subsequent incorporation in 1980, CMS has provided all phases of Cost Estimating for a wide variety of municipal, county, state, and federal governmental projects, and has done so with an impeccable track record. CMS' goal has always been to provide its clients with accurate Cost Consulting /Control, Value Engineering, and competent Construction Management, bringing in projects on time and within budget in order to protect its clients' fiscal requirements without sacrificing aesthetics. Cha.... . CONTINUING PROFESSIONAL SERVICES I RFO NO. 14 -07-02 72 C M QUALIFICATIONS SUBCONSULTANTS CMS- CONSTUCTION MANAGEMENT SERVICES S CONSTRUCTION MANAGEMENT SERVICES, INC. RELEVANT PROJECTS Cba .. CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14-07-02 73 Nature Cost of - Year CMS, '. Project Name I Location Of Entire Inc. - Owner's Name I Address if Phone Work. Project Completed $ Services. Heritage Park and Parking Garage, Preliminary 13,754,537 2008 City of Sunny Isles Beach Sunny Isles Beach, FL Cost Estuni / do AECOM (fka: Spillis CandeW DMJM) Value 800 Douglas Entrance (Development of Park ing Garage; Engineervg North Tower, 2nd Flow 2,260 Project Site Size = 162,260 SF; Coral Gables, FL 33134 New Park Size = 119,406 SF; Contact: Nina Gladstone New Parting Garage = 182,480 SF with Title: Senior Associate 499 car spaces) Telephone: (305)444 -0691 Fern Forest Nature Center Schematic 468,752 2008 Broward County, FL Coconut Creek, FL Design / Community Services Department Construction Parks and Recreation Division (Included: Documents One North University Drive, Bldg. B, Ste. 40 1. Overlook = $43,378.00; Cost Estimating / Plantation, FL 33324 2. Restmom Renovation = $272,096 Omens Contact: Richard Voss Size = 880.38 SF; Representative Title: Project Manager III 3. AJC 11° 8 2n° 6. Replacement = Phone: (954) 5773633 $47.59; 4. Re+cofing = $105,679; Size = 6,472 SF Downtown Park Building Schematic 921,381 2008 City of Oakland Park Oakland Park, FL Design do CPZ Architects. Inc. Cost Estimating 4316 West Bmward Boulevard (Renovation of Warehouse into a Civic Plantation, FL 33317 Suiting where park area will be Contact: Chris P. Zimmerman, ALA forttcorning; includes: Lobby, Two Title: President Meeting Rooms, Catering, Storage, and Phone: (954) 792 -8525 Restmorms Museum Park Miami - Phase I Master Plan / 38,276,256 2009 City of Miami, FL Miami, FL Schematic do Cooper, Robertson 6 Partners Design / 311 West 43rd Street (Preparation of ground site of new park Design New York, NY 10036 that will be located on the south side of Development Contact: Michael Jasper a new museum; includes demolition / Cost Estimating Tire: Principal development / irrigation / excavation/ Phone: (212) 247 -1717 tree prunirg/t re repair 8 placement; Size = 45.52 acres South Pointe Park Pier Project GMP 4.344, 145 2012 Coy of Miami Beach Miami Beach, FL Construction 1700 Coovention Center Drive Documents Miami Beach, FL 33109 (Demolition of old and construction of new Cost Estimating Contact: Matilde'Matte- E. Reyes, RA. Fishing Pier) Title: Senior Project Coordinator Plane: 305 673 -7071 University of Miami- Wellness Park Conceptual 1,669.132 2012 State of Florida - Department of Educalion Miami, FL Design do I(imiey -Mom and Associates, Inc. Cost Fstmar 1221 Bdckell Avenue, Sure 400 (Conversion of a Parking Lot into a Park; Miami, FL 33131 Size of Park: 1.29 Acres [56,090 SF) Contact: George E. Pug, RLA Title: Manager Phone: 305 673.2025 City of Miami Beach - Alexander Muss Coretruabn 263,460 2014 City of Miami Beach Park Pavilion Renovation Docvmems (Add New 1700 Convention Center Drive Cost Estimating Canopy Roof Miami Beach, FL 33109 (Renovation of bathrooms b ADA = 22,538) Contact: Dewayne Gordon Compliance) Tire: Capital Projects Coordinator Phone: (305)673-7071, Ed. 6698 Sullivan Park Improvements Construuion 4,993,576 2014 City of Deerfield Beach CRA Deerfield Beech, FL Documents 200 Goolsby Boulevard Cost Estimating Deerfield Beach, FL 33442 (Ste Work = 130,519 SF; Coolea: Mr. Hiep S. HuyM, P.E. Slav Tower = 130,519 SF; Title: CRA Project Manager Rest-corn Building = 1,520 SF) Phone: (954) 480-4402 Cba .. CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14-07-02 73 QUALIFICATIONS SUBCONSULTANTS CMS - CONSTUCTION MANAGEMENT SERVICES State of Florida Department of State 1 muff fim tir � ®EVaf dd tlfi Wu C_N.5.1'OASfAL'CTIX.' 4AA'AGENE \'I SEA \ICES IhY'.u�mpain aEmad. .. i6e 4az 1de $ue oEfbvs (JN m Nude IJ, 19FA. rim ���mYUUin;, en:e ±. �fieWV mup m.,w mo��m,o+d airm a�ma dr win Da�S��. w mwwc ®rmo. _ .a fi61 m I� 5.:01 014, �, vtl iu aam a xme. I finEn caofi Wv vi1 m5vnin Iv m fiW AKIa ofOiasohnwn. o...sti• /rt�NEi..S. �1JJmn.Y(yL�i . ubM�d�. his S'!Cl[fpl)'OfSiQl! r.rr�rrr ule arr� /cc Minority, Women & Florida Veteran Business Certification CMS - Construction Management Services, Inc. 1.5Ar,. F u 56 Yrv5f 4. J ?.ST evd 3.5.1. Ebnda Su5u5ee laa prrvd fi5m: 031642014 In 03/04!2016 f �w1 SERVICES SO 5 uvwvst•e.....�arurr�..rr.5.w.. nuw.m�uw. �.rrrEn CONTINUING PROFESSIONAL SERVICES I RFO NO. 14 -07 -02 74 O O 0 O O O O O O O O O O O O O O e e e e e e • s e e • a...�r.a�.R (v WILLY BERMELLO, AIA, AICP ALFREDO SANCHEZ, AIA, AICP, LEED AP PRIME CONSULTANT BERMELLO AIAMIL 8 PARTNERS, INC. RANDY HOLLINGWORTH KIRK J. OLNEY, RLA TERE GARCIA PATRICIA SUAU DEREK WASSINK, P.E., R.A., S.I., LED AP JEFFREY MCGEE, P.E, S.I. II.L^•DSII3LIlQ� JOAQUIN VARGAS, P.E. JUSTIN FREEDMAN, MS NADIA G. LOCKE, P.E. PATRICIA L GERTENBACH, P.G. STAFFING ORGANIZATIONAL CHART SCOTT BAKOS TODD OSBORN, RA, NCARB, LEED AP JORGE FERRER LOUIS AGUIRRE, P.E., LEED AP SERGIO SERRANO, P.E., LEED AP MARIO PAZOS, P.E., LEED AP EDUARDO SUAREZ, P.E., LEED AP Surveying STEPHEN H. GIBBS LAND SURVEYORS, INC STEPHEN SEELEY, P.S.M. MARK BERRY, P.S.M. STEPHEN GIBBS, P.S.M. Cost Control and Est imoting CONSTRUCTION MANAGEMENT SERVICES CONTINUING PROFESSIONAL SERVICES I RFO NO. 14 -07-02 75 O O O O 0 0 O O 0 0 0 0 0 O O EDUCATION Master of Architecture, University of Pennsylvania. 1975 STAFFING RESUMES BERMELLO AJAMIL & PARTNERS, INC. Willy Bermello, AIA, AICP Principal Mr. Bermello is Chairman of the Board and Principal of Bermello, Ajorna & Partners. Inc. He is a Florida - registered professional architect with over 30 years of experience in professional practice. His background includes a broad base of public and private projects, including development of large commercial facilities, educational focTties, aviation, transportation and port related developments. Willy Bermello is recognized as one of the leading architects in South Florida. He has been involved with numerous state and local professional, civic and social organizations/ institutions. typically at the senior level. He has received numerous honors and awards for his professional design work as well as his civic involvement within the community. RELEVANT EXPERIENCE Margaret Pace Park, Miami, Florida - Principal in Charge. B &A provided the programming, master planning, schematic design, design development and construction documentation for this 8.25 acre, regional urban park on the City of Miami s waterfront. The overall park plan includes four tennis courts, two soccer fields, one cricket pitch, tot lot and children's playground, exercise stations, street and water oriented urban plazas, waterfront promenade, shoreline stabilization, picnic shelters, site furniture, security lighting and landscape improvements. The incorporation of locally inspired public art provides the park it's own identity and sense of place in the community. Master of City Planning, Morgan Levy Park & Community Center Design /Build, Doral, Florida - Principal in Charge. Design University of Pennsylvania. 1975 for the renovation of this 14 -ocre Park. In designing the renovations, an active and passive Bachelor of Architecture. community center was developed, working within the confines of the existing site layout which University of Florida, 1973 included tennis courts, a recreation building and a parking lot. REGISTRATION Pinecrest Community Center Master Plan, Village of Pinecrest, Florida - Principal in Charge. B &A Registered Architect was selected to evaluate and Master Plan the existing Pinecrest Community Center. The existing State of Florida. 1974 facility and 14,600 SF Community Center Building are approximately 51h years old and well used Reg. No. AR 0007200 by local residents. However, budgetary constraints at the time of design and a compromised planning stage has resulted in a facility now considered outgrown and undersized to serve PROFESSIONAL AFFILIATIONS the needs of the Community. B &A evaluated the existing Community Center Building and American Institute of Architects surrounding facilities as well as currently offered programs and activities. In addition, BS.A lead American Institute of Certified a public outreach effort on behalf of the Village which included hosting three charreffe -style Planners Community Meetings, surveying residents and collecting public input. B &A developed a Master Plan suitable for implementation over extended phases as funding is allocated and /or the need for additional programming increases. The proposed Master Plan projects the physical growth of the Community Center Building over three phases to a total of size of 31,500 SF. Miami Springs Aquatic Facility, Florida - Principal in Charge. B &A is currently in the process of developing a design criteria package for a new aquatic facility. Services include assiting in the preparation of plan components and supervision of the design /build project, construction supervision and community involvement. Aventura Community Center, Aventura, Florida - Principal in Charge. B &A envisioned the project to act as the heart of the city's public /civic destination. The scope included preparing a master plan within a 3.2 acre waterfront site, and provided full design and documentation including architectural interior design, landscape architecture and civil engineering services. The building is divided into athletic, educational, and administrative rooms and gathering spaces, organized by a linear gallery space with functional rooms on one side and glass on the other, emphasizing the view to the park and water. An 8.800 SF gymnasium with a 150 person seating capacity anchors the gallery and all multi - purpose rooms. The open spaces consist of entry pavilion, covered walkways, a tower, and spaces for informal gatherings. Cba ...._ CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14 -07 -02 F[d O O O O O O O Nn \I A O O O 0 0 O O O STAFFING RESUMES BERMELLO AJAMIL & PARTNERS, INC. Willy Bermello, AIA, AICP Principal Athalie Range Park Pool Facility Improvements, Miami, Florida - Principal in Charge - A/E services for the development of construction documents, bid /negotiations and construction administration. The project scope included the remodeling of the existing pool facility, including office, bathrooms, pool and pool equipment. SaNadore Park and Tennis Center Improvements, Coral Gables, Florida - Principal in Charge. B &A provided programming, park master planning, schematic design and construction documentation for this tennis center and public park located in Coral Gables, Florida. The facility has 13 tennis courts including eight clay courts and five hard /asphalt courts and a tennis center that houses restrooms, showers and a tennis pro-shop. In addition, the park features a picnic pavilion, playground, tot lot, picnic area and sheet fumiture. Miami Entertainment Complex, Miami, Florida - Principal in Charge - B &A framed and authored the Design Criteria Package used by the Owner (Miami CRA) to solicit and advertise for proposals from Design -Build teams. The resulting B &A Design Criteria Standards Manual outlined a suitable design solution for the Owner's program as well as the requirements for a facility that fulfilled the intended User's and industry expectations. The Design Criteria Package also served to identify and address early in the pre -design process critical project development concerns related to regulatory and permitting agency restrictions, community stakeholder interests, and the vetting of cost - effective and practicable design solutions. Miami -Dade Water And Sewer Department Headquarters Facility, Miami, Florida - Principal in Charge. B &A served as Design Criteria Professional for the $30 million headquarters facility comprised of a -5 story office building and a 10 -story parking garage. MAJOR CIVIC ACCOMPLISHMENTS (partial list( 2011 Coral Gables Community Foundation named its annual Legacy Award in honor of Willy A. Bermello. 2003 Mr. Bermello received the Alumni Hall of Fame Award from Miami -Dade College. 2000 Mr. Bermello was recognized with the Humanitarian Award from the American Jewish Committee. 1997 Mr. Bermello was recognized with award of the Civil Rights Advocacy Award at the Civil Rights Conference, Tampa, Florida. 1992 Mr. Bermello became the first Hispanic and the first Republican to Chair the Florida Commission on Human Relations. 1992 Mr. Bermello was elected as the Founding President of the Coral Gables Community Foundation. 1988 Mr. Bermello became the first Cuban American to be elected President of the Coral Gables Chamber of Commerce. 1987 Mr. Bermello founded the Miracle Mile rest. a project of the Coral Gables Chamber of Commerce. 1984 Mr. Bermello spearheaded a 5 -year effort which culminated in the creation of the Latin Quarter District. Subsequently was appointed by the City Commission to serve on the Review Board and twice elected Chairman by the Board members. 1977 Mr. Bermello co- founded the Calle Ocho Festival and served as its chairman for two years. COMMUNITY INVOLVEMENT (partial list) FIU Presidents Council, 2013 - Present MiomFDode College Architecture and Interior Design Advisory Committee. 2004 -2007 Florida Housing Finance Corporation, 2000.2002 Colonial Bank South Florida Region, Board of Directors. 1998 -2008 Cuban American National Foundation (CANT(. Board of Director. 1998 -2000 Latin Builders Association (LBA(. President, 1997 -1999 and Board Member, 1997- present Orange Bowl Committee - Member. 1997 -2008 City of Miami Urban Development Review Board. 1991 - present: Chairman, 1994- present University of Florida. Foundation, 1999 -2008 Coral Gables Chamber of Commerce. Past President, Trustee and Board Member, 1997 - present Golden Cane. University of Miami. 1990 -2009 Grand Pro( Foundation, Director. 1997 -1998 Florida International University Council of 100 Steering Committee - Member 1997 Kiwanis Club of Little Havana. Past President, 1979 -1981, Member of Past Presidents Council Greater Miami Chamber of Commerce, Trustee, 1981 - present South Florida Gang Outreach, Director, 1999 Airport Council International (ACI( - Planning & Design Committee, 1995 Regent, Leadership Florida Association -1995 Citizens Board, University of Miami State of Florida, Board of Architecture and Interior Design, 1994 CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14-07-02 77 0 0 0 O 0 0 0 STAFFING RESUMES BERMELLO AJAMIL & PARTNERS, INC. Alfredo Sanchez, AIA, AICP, LEED AP Partner, Project Manager Alfredo Sanchez is a Florida -registered architect and AICP- Certified planner with more than 25 years of experience in architecture and urban planning and design. Mr. Sanchez has directed a number of major planning studies and urban design plans in the Miami area and throughout the world. His project experience encompasses city wide master plans, corridor plans, major reconstruction efforts, pedestrian improvements, urban, retail and mixed -use development projects, land planning projects including redevelopment and design of new communities, and seaport master plans. Apart from his extensive experience, Mr. Sanchez's strength lies in his understanding of project methodology and approach. This solid foundation is complemented by his ability to understand all aspects of a project, from the initial economic feasibility analysis to the ultimate impact and image of the project architecture. REGISTRATION Registered Architect, State of South Creek Neighborhood Landscape Improvements, Coconut Creek, Floddo - Senior Planner. Florida. 1979 B &A developed a landscape improvements plan. Neighborhood meetings played a key role Reg. No. AR 0007969 in gathering information about concerns and preferences. They focused on issues important to the residents and have been critical in forming the basis of the study. This will be used in the Registered Architect, Colegio planning and design of the sfreetscopes, signage, traffic calming and general neighborhood Federodo de Ingenieros y landscape improvements. Coconut Creek has commissioned a new design for the main Arquilectos. Costo Rica. 1985 roadway bordering South Creek. B &A will build on the improvements proposed in that plan to American Institute of Certified enhance the quality of the gateways into the neighborhood. B &A's final design solutions will Planners. 1994 form o framework for the city in implementing projects as funding becomes available. Certified General Contractor, RELEVANT EXPERIENCE 2004 (inactive) Beach Plaza Redevelopment and Public Beach Revitalization Design, Pompano Beach, Florida - Project Manager for the planning and urban design of the Pompano Beach Boulevard beach CERTIFICATION LEED AP Certification, 2007 front redevelopment. A controversial project that balanced the interests of the local residents, EDUCATION City and County access concerns in the redevelopment of Pompano Beach Boulevard and Master of Architecture, University of Pennsylvania, 1978 adjacent sites that are presently used for surface parking, a pump station to be relocated and American Institute of Certified a beach front restaurant that leads to the Pompano Beach Fishing Pier. The thrust of the design Master of City Planning, addresses the relocation of the previously mentioned uses and the bending of the Pompano University of Pennsylvania, 1978 Beach Boulevard to create an expanded beach front restaurant and pier access site, new park AWARDS open space and a proposed parking structure to accommodate 500 vehicles and maintain Bachelor of Architecture, public access to the beach. The project addressed numerous issues of waterfront development University of Florida. 1972 including engineering, sea turtle protection and beach dune restoration. REGISTRATION Registered Architect, State of South Creek Neighborhood Landscape Improvements, Coconut Creek, Floddo - Senior Planner. Florida. 1979 B &A developed a landscape improvements plan. Neighborhood meetings played a key role Reg. No. AR 0007969 in gathering information about concerns and preferences. They focused on issues important to the residents and have been critical in forming the basis of the study. This will be used in the Registered Architect, Colegio planning and design of the sfreetscopes, signage, traffic calming and general neighborhood Federodo de Ingenieros y landscape improvements. Coconut Creek has commissioned a new design for the main Arquilectos. Costo Rica. 1985 roadway bordering South Creek. B &A will build on the improvements proposed in that plan to American Institute of Certified enhance the quality of the gateways into the neighborhood. B &A's final design solutions will Planners. 1994 form o framework for the city in implementing projects as funding becomes available. Certified General Contractor, City Wide Parks Master Plan, Hallandale Beach, Florida - Project Manager. The City Wide Master 2004 (inactive) Plan consisted of a holistic analysis of City residents passive and active recreation needs. A rigorous recreation needs analysis was undertaken to provide the basis for park facilities CERTIFICATION LEED AP Certification, 2007 improvements. An extensive community involvement program was undertaken to incorporate community needs and desires for park and recreation facilities and services. Specific park PROFESSIONAL AFFILIATIONS designs and improvement plans were provided for the each of the City's fourteen parks. American Institute of Certified Planners, 1994 City Wide Parks Master Plan, Pompano Beach, Florida - Project Manager. With forty -one park facilities and a population of nearly 100,000 inhabitants, the City contracted the B &A team to AWARDS carry out a needs analysis, evaluate existing park facilities and create a City Wide Parks Master Miami Chapter American Institute of Architects Plan to address short and long term park improvements in the City. "Urban Planner of the Year" 2006 Collier Neighborhood Development Master Plan, Pompano Beach, Florida - Senior Planner and Urban Designer of the Concept Master Plan for the Collier Neighborhood. Public involvement was a major component of the project scope. Scope was comprised of 4 deliverables: (1) assessment of existing conditions to include a functional analysis of the area: (2) assessment of issues and opportunities present that affect the development of the neighborhood: (3) a fist of recommendations and projects to include cost estiamtes and possible funding sources and (4) the delivery of the final Colter Neighborhood Development Concept Master Plan Report. Cba "„r. .._ CONTINUING PROFESSIONAL SERVICES I RFa NO. 14 -07 -02 78 Cresthaven Community Center Site Identification and Evaluation Analysis, Pompano Beach, Florida - Project Manager. working in close cooperation with City of Pompano Beach Staff. B &A identified program needs for a future Cresthaven Community Center; identification of potential sites to house the facility; and an evaluation of the site characteristics with the formulation of an evaluation matrix for site selection and final preferred site recommendation. The City proceeded to acquire the recommended site based on the study carried out. 31st Avenue 10 Acres Site Community Recreation Evaluation Analysis, Pompano Beach, Florida - Project Manager. B &A evaluated site conditions and needs to house a major football recreation facility in a 10 acres site to be ceded to the City as part of a larger development agreement. B &A carried out site engineering analyses, site access analyses, and developed a series of design options to address site access, parking and facility location. DECOMAP ColBer Neighborhood Development Master Plan, Pompano Beach, Florida - Project Manager. Development of a community driven master plan to serve as a roodmap for neighborhood improvements. The Master Plan addressed streetscape improvements, housing improvements, recreational facilities improvements and created a prioritized list of projects based on a neighborhood survey that expressed community needs and preferences. ® Town Center Master Plan, Coconut Creek, Florida - Project Manager for the Master Plan for 148 strategically located green field ® acres. The project addressed incorporating environmental analyses, roadway infrastructure requirements, identification of regulatory constraints, and the identification of market and economic trends that would influence the future development of the site. A market ® analysis was carried out by Lambert Advisory to define general demand for different uses, residential, commercial, office and civic uses. This process was carried out to also to define design parameters that should guide the commercial element of project development. ® From the program established, and in cooperation with the City of Coconut Creek Sustainable Development staff. B &A prepared a series of design options based on different development intensities. Two workshops were held with elected officials and residents to ® evaluate the development direction and establish consensus on the project. Subsequently, as a recommendation of the study, the ® City acquired properties to become an important player in project development and ascertain the desired development direction. City Wide Master Plan, Hollywood, Florida - Carried out all the urban design analysis and is responsible for the development of the 0 Urban Design Element of the Master Plan. Directed the urban design component of the city -wide master plan. Analysis of the different sectors that comprise Hollywood assessed the problems and opportunities in each area. O O O 0 0 0 0 O O Urban Design Consultant, Homestead, Florida - Acted as the City's Urban Design consultant to the Planning and Zoning Board from 2002 to 2007. Mr. Sanchez was responsible for the urban design review of all new developments in the City which was mostly east of the Homestead Extension of the Florida Turnpike. Other City projects that Mr. Sanchez directed included: • Commercial Development Regulations • Signage Regulations • Transportation Plan Urban Design Element • Downtown Historic District Master Plan South Dade Redevelopment Plan, Miami -Dade County, Florida - Project Manager and Director. An economic development plan for nine low-income neighborhoods in Mioml-Dade County. Measured the economic Fife of these neighborhoods, their positioning versus major employment centers, competition for housing and area businesses from adjoining neighborhoods, and the degree to which their economic growth was affected by major problems related to housing, education and crime. New Orleans Neighborhoods Rebuilding Plan -A Strategy for Reconstruction, New Orleans, Louisiana - Project Manager for the preparation of the project approach and directed the development of research, plans and community outreach. This complex planning effort involved planning for 48 different areas of one of the major metropolitan areas in the United States and one with historic significance. The Neighborhood Rebuilding Plan strategy for reconstruction State Road 7 Multimodal Station Area Planning and Design, Broward County, Florida - Development of the analyses and plans for the design of the State Road 7 Busway North Broward Station planning and design, including analysis of surrounding context area, bus access, proposed residential and office joint use development, and ancillary parking facilities. Cba r„r,,,•„" — CONTINUING PROFESSIONAL SERVICES I RFQ NO. I4 -07 -02 79 • • STAFFING ® RESUMES BERMELLO AJAMIL & PARTNERS, INC. ® Alfredo Sanchez, AIA, AICP, LEED AP db Partner, Project Manager Cresthaven Community Center Site Identification and Evaluation Analysis, Pompano Beach, Florida - Project Manager. working in close cooperation with City of Pompano Beach Staff. B &A identified program needs for a future Cresthaven Community Center; identification of potential sites to house the facility; and an evaluation of the site characteristics with the formulation of an evaluation matrix for site selection and final preferred site recommendation. The City proceeded to acquire the recommended site based on the study carried out. 31st Avenue 10 Acres Site Community Recreation Evaluation Analysis, Pompano Beach, Florida - Project Manager. B &A evaluated site conditions and needs to house a major football recreation facility in a 10 acres site to be ceded to the City as part of a larger development agreement. B &A carried out site engineering analyses, site access analyses, and developed a series of design options to address site access, parking and facility location. DECOMAP ColBer Neighborhood Development Master Plan, Pompano Beach, Florida - Project Manager. Development of a community driven master plan to serve as a roodmap for neighborhood improvements. The Master Plan addressed streetscape improvements, housing improvements, recreational facilities improvements and created a prioritized list of projects based on a neighborhood survey that expressed community needs and preferences. ® Town Center Master Plan, Coconut Creek, Florida - Project Manager for the Master Plan for 148 strategically located green field ® acres. The project addressed incorporating environmental analyses, roadway infrastructure requirements, identification of regulatory constraints, and the identification of market and economic trends that would influence the future development of the site. A market ® analysis was carried out by Lambert Advisory to define general demand for different uses, residential, commercial, office and civic uses. This process was carried out to also to define design parameters that should guide the commercial element of project development. ® From the program established, and in cooperation with the City of Coconut Creek Sustainable Development staff. B &A prepared a series of design options based on different development intensities. Two workshops were held with elected officials and residents to ® evaluate the development direction and establish consensus on the project. Subsequently, as a recommendation of the study, the ® City acquired properties to become an important player in project development and ascertain the desired development direction. City Wide Master Plan, Hollywood, Florida - Carried out all the urban design analysis and is responsible for the development of the 0 Urban Design Element of the Master Plan. Directed the urban design component of the city -wide master plan. Analysis of the different sectors that comprise Hollywood assessed the problems and opportunities in each area. O O O 0 0 0 0 O O Urban Design Consultant, Homestead, Florida - Acted as the City's Urban Design consultant to the Planning and Zoning Board from 2002 to 2007. Mr. Sanchez was responsible for the urban design review of all new developments in the City which was mostly east of the Homestead Extension of the Florida Turnpike. Other City projects that Mr. Sanchez directed included: • Commercial Development Regulations • Signage Regulations • Transportation Plan Urban Design Element • Downtown Historic District Master Plan South Dade Redevelopment Plan, Miami -Dade County, Florida - Project Manager and Director. An economic development plan for nine low-income neighborhoods in Mioml-Dade County. Measured the economic Fife of these neighborhoods, their positioning versus major employment centers, competition for housing and area businesses from adjoining neighborhoods, and the degree to which their economic growth was affected by major problems related to housing, education and crime. New Orleans Neighborhoods Rebuilding Plan -A Strategy for Reconstruction, New Orleans, Louisiana - Project Manager for the preparation of the project approach and directed the development of research, plans and community outreach. This complex planning effort involved planning for 48 different areas of one of the major metropolitan areas in the United States and one with historic significance. The Neighborhood Rebuilding Plan strategy for reconstruction State Road 7 Multimodal Station Area Planning and Design, Broward County, Florida - Development of the analyses and plans for the design of the State Road 7 Busway North Broward Station planning and design, including analysis of surrounding context area, bus access, proposed residential and office joint use development, and ancillary parking facilities. Cba r„r,,,•„" — CONTINUING PROFESSIONAL SERVICES I RFQ NO. I4 -07 -02 79 • • • • • • • • • • • • • • • • • EDUCATION Master of Landscape Architecture in Urban Design, Harvard University. 1984 STAFFING RESUMES BERMELLO AJAMIL & PARTNERS, INC. Randy P. Hollingworth Senior Associate, Director of Planning and Landscape Design Studio Professional Design Experience Randy Holingwohh has more than 30 years experience as an urban and landscape designer. His specialty is the design and development of mixed use projects and their integration within the urban fabric. With a comprehensive understanding of the needs and requirements of various land uses. Mr. Hollingworth has prepared development plans for a wide range of project types. He has developed master plans and design guidelines for commercial and retail areas, office parks and residential communities in numerous waterfront locations throughout Florida. In addition to his extensive urban design and planning experience, Mr. Holingworth has worked on a wide variety of landscape design oriented projects. PARK PLANNING AND DESIGN EXPERIENCE Sullivan Park, Deerfield Beach, Florida - Project Manager. BRA has developed alternative master plan concepts for on existing 3 acre, underutilized waterfront park. With a significant historical background, the site offers an opportunity to educate the residents about the history of their community. A primary goal of the park master plan will be to provide an interpretive program for visitors. The program for the revitalized park includes two playgrounds, restrooms, picnic shelters, an interactive water feature, a 15 foot wide waterfront promenade and a new stair tower to connect the site to the bridge leading over to the City's beach front area. Bachelor of Landscape George Brummer Park, Pompano Beach, Florida - Project Manager. Responsible for the Architecture. University of conceptual and detail design for a new neighborhood park on the site of a former tennis center. Guelph, 1978 The program was developed utilizing public workshops and numerous meetings with local neighborhood groups. Amenities within the five acre park include: tennis courts, a basketball court, a sand volleyball court, bocce courts, racquetball courts, two playgrounds, an outdoor exercise work out area, public restrooms and passive open space with picnic tables. Located adjacent to a large water retention area and golf course, the site offers one of the few public open spaces within the community for outdoor recreation. Cba r...........w... James Archer Smith Park, Homestead, Florida - Project Manager responsible for the landscape design of this underutilized neighborhood park. Since the existing facilities were underutilized and in deteriorated condition, the park was completely redesigned with all new facilities. The new plan features multiple areas for recreation, both passive and active and a new feature in the park, a handicap accessible interactive water feature. Other amenities included additional on street parking, two dog parks, two playgrounds and multiple picnic areas. Wittkop Park Master Plan, Homestead, Florida - Project Manager responsible for the development of a master plan covering the redevelopment of a 2.5 acre park located in the City of Homestead. Florida. The park will include two basketball courts, toddler and pre teen playground areas, two handball courts, a walking trail and restroom facilities. This is the second neighborhood park Mr. Hollingworth has designed within this neighborhood. The first was James Archer Smith Park, already one of the most successful parks in the City. Harry S. Truman Presidential Park, Key West, Florida - Project Manager for a 23 -acre waterfront master plan. The park incorporates a 50 -foot -wide waterfront promenade, on open air amphitheater, a Turtle Rescue Hospital, a 15,000 -SF event plaza with tent structure, a renovated Navy Generator Plant to be reused for a restaurant and historical museum, a dockmaster facility, an interactive water feature, exercise trail, outdoor zoological exhibits, a ferry terminal, a 60+ boat marina, fishing pier and a new recreation complex for the adjacent residential community of Bahama Village. West Drive Park, North Bay Village. Florida - Project Manager for the development a new master plan for 'his Y -acre waterfront park. Fully utilizing a small area, the design for the park incorporates a new stage, restrooms. playground, exercise path, picnic shelters and docks. B &A developed a full set of construction plans and assisted in the bidding and construction phase. CONTINUING PROFESSIONAL SERVICES I RFO NO. 14 -07 -02 0 STAFFING RESUMES BERMELLO AJAMIL & PARTNERS, INC. Randy P. Hollingworth Senior Associate, Director of Planning and Landscape Design Studio South Treasure Drive Park, North Bay Village, Florida -Project Manager. Provided conceptual design services for a proposed waterfront park on South Treasure Drive along the Intracoastal waterway. Due to the small size of the parcel, the program for the proposed park was limited and was designed to maximize the waterfront location and allow local residents an opportunity for public open space. City Wide Parks Master Plan, Hallandale Beach, Florida - Senior Planner /Landscape Designer for the development of the City Wide Parks Master Plan for the City of Hallandale, Beach, Florida. The City Wide Master Plan consisted of a holistic analysis of City residents passive and active recreation needs. A rigorous recreation needs analyse was undertaken to provide the basis far park facilities improvements. An extensive community involvement program was undertaken to incorporate community needs and desires for park and recreation facilities and services. Specific park designs and improvement plans were provided for the each of the City's fourteen parks. City Wide Parks Master Plan, Pompano Beach, Florida - Senior Planner /Landscape Designer far the development of the City Wide Parks Master Plan for the City of Pompano Beach, Florida. With fortyo park foa3ties and a population of nearly I OD.00D inhabitants, the City of Pompano Beach contracted B&A and its sub - consultant team to carry out a needs analysis, evaluate existing park focBties and create a City Wide Parks Master Plan to address short and long tens park improvements in the City. Kate Jackson Park, Tampa, Florida - Project Manager responsible for the development of a master plan covering the complete renovation of this park located in the historic residential neighborhood of Hyde Park in Tampa Florida. The program, which included a new interactive fountain, expanded playground and improved open space areas, was developed as per the City Mayor's Beautification Program in collaboration with neighborhood residents and the Parks and Recreation Department. Bern's Park and Desoto Avenue Sheetscape, Tampa, Florida - Project Manager responsible for the development of a passive open space on an undenrtifized parcel of land at the gateway to the historic district of Hyde Park. In addition, Mr. Holfingworth developed a new streetscape program along Desoto Avenue which focused on the preservation of existing oak trees while reducing the ongoing maintenance costs of the central median. working with the neighborhood and City Public Works, the streetscape program has been implemented and successfully created a dramatic improvement to the visual quality of the neighborhood. OTHER RELEVANT EXPERIENCE South Creek Neighborhood Landscape Improvements Plan, Coconut Creek, Florida - Project Manager responsible for planning and design of the streetscape, signage, traffic calming, and general neighborhood landscape improvements. Mr. Hollingworth held neighborhood meetings which played a key role in gathering information about concerns and preferences from the community. The information will be used in the planning and design of the streetscapes, signage, traffic calming and general neighborhood landscape improvements. The City has commissioned a new design for the main roadway bordering South Creek and B &A will build on the improvements proposed in that plan to enhance the quality of the gateways into the neighborhood. Beach Plaza Redevelopment and Public Beach Revitalization Design, Pompano Beach, Florida - Project Manager responsible for the landscape architectural design master plan associated with this project consisting of the redevelopment plan for the only beachfront area of the City. The project scope includes the planning and layout of public amenities and beochfront activities and streetscape and public open space design along Palm Beach Boulevard. The "Nevi' Pompano Beach Boulevard and extension to Atlantic Boulevard will create dramatic gateways to the City's beach area. The City has subsequently retained B&A to further develop the landscape plans and construction drawings for the streetscape design of Atlantic Boulevard between Pompano Beach Boulevard and AI A. The project entails a heavy public participation aspect regarding design concepts and input from residents of the area with several community workshops held to this effect. Beautification Master Plan, Miami Lakes Florida - Project Manager. Prepared Town wide master pion vision for aesthetic and landscape improvements for the next fifty years. NW 107th Avenue Sheetscape. Doral, Florida - Project Manager responsible for the landscape design of a two mile section. The plan will continue the streetscape theme utilized in other areas of the City but provide a unique character and design for this newly widened roadway. The assignment includes presentations to the City and neighborhood groups bordering the roadway. West Bay Drive Sheetscape, Largo, Florida - Project Manager resporsible for the redesign of the primary commercial conidor, west Bay Drive, traversing the downtown Largo area. Mr. FloRrlgworth was also responsible for the redesign of the roadway layout including parkways, new landscaped medians, lighting, paving, cross walks, entry signage and adjacent off sheet City owned parking areas. Cba CONTINUING PROFESSIONAL SERVICES I RFO NO. 1 4-07 -02 81 EDUCATION Bachelor of Science in Landscape Architecture, Ohio State University, Columbus. Ohio 1995 REGISTRATION State of Florida. Registered Landscape Architect, No LAD001705 Received on November, 2000 STAFFING RESUMES BERMELLO AJAMIL & PARTNERS, INC. Kirk Olney, RLA Landscape Architect Professional Design Experience Mr. Olney is a Registered Florida Landscape Architect with extensive experience in managing landscape architectural and multi - disciplinary design, production and construction projects. Most of his career has been focused on the public realm providing his experience on the design and implementation of parks, streetscopes and roadway landscape design. Areas of practice include master planning, conceptual and detailed design, the production and management of construction documents, preparation of construction contract documents and construction services. Management experience includes scope of services preparation and negotiation, office management, scheduling and managing staff time, tracking utdzation and project organization. Mr. Olney also has experience preparing and submitting applications to regulatory agencies and responding to comments accordingly to obtain required permits. His special area of interest and expertise is the use of tropical and subtropical plant material. PARKS & RECREATION EXPERIENCE Intracoastal Park, Sunny Isles Beach, Florida - Project Manager. Two vacant, 1.5 acre parcels were developed in two new passive parks. The project included demolition of the existing landscape; the addition of a 5' tall concrete /CMU screen wall along the southern property line, decorative stone columns and on aluminum picket fence along the Intracoastal waterway, benches and trash receptacles, picnic tables with umbrellas, bike racks, concrete walkways, site grading, security lighting, landscaping and irrigation. The project also included the location for park signage and an pieces provided by the City. B.F. James Park & Aquatic Facniy, Hallandale Beach, Florida - Landscape Architect. This project encompassed the complete redevelopment of an underused existing neighborhood park through extensive public input and master plan development. B &A developed an extensive program for the new park including a new community swimming facility. bosketbalf courts, picnic areas, exercise stations and on expanded playground. In addition, to meet City code requirements, the park and buildings were designed for LEED Certification. B &A managed the LEED Certification and led the design team through the certification process. B &A developed various architectural alternatives for the aquatic swim building. The architectural style of this facility will serve as the bases for the design of all public buildings in future City parks. Although relatively small, the new pool will serve the community's recreational needs and includes a beach entry feature and three lop lanes which can be modified for swim health classes. The park was designed utilizing numerous CPTED principles. Harry S. Truman Waterhont Park, Key West, Florida - Landscape Architect. Assisted with design synthesis; worked with team to prepare development approval application and prepared landscape and hardscape construction drawings for a new passive recreation park. South City Beach Park. Hallandale Beach, Florida - Landscape Architect. Duties included site plan and design refinement and worked on team to prepare construction drawings for improvements to a sir -acre active recreation beach front park. Scavo Park, Hallandale Beach, Flodda - Landscape Architect. Duties included site plan and design refinement and worked on team to prepare construction drawings for improvements to a seven -acre passive recreation neighborhood park. Hillsboro Inlet Park, Pompano Beach, Florida - Landscape Architect. Activities included site planning; tree relocation plan; preparation of hardscape and landscape construction drawings, and coordination with other design disciplines for a passive park along the Intracoastal waterway with walking path, parking lot, tot bt /playground, boardwalk/pier and restroom facility. CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14 -07-02 82 STAFFING RESUMES BERMELLO AJAMIL & PARTNERS, INC. Kirk Olney, RLA Landscape Architect Catherine Strong Park Defray Beach, Florida - Responsible for client review meetings, plant selection and specification; hardscape design, preparation of hardscape details, coordination with other design disciplines, preparation of opinion of probably cost and modifying design to keep proposed improvements within budget and preparation of bidding documents for a ten acre passive and active recreation park with walking path. picnic pavilions. seating, interactive water play, tot lot /playground, reshoom building, parking and landscape. Holpallokee Regional Pork, Martin County, Florida - Responsible for field verification of existing trees; coordination of civil sub - consultant; preparation of free relocation plans; preparation of hardscape construction drawings including fencing and paving details; preparation of landscape construction drawings; provided construction observation services including supervision of free relocation for a 200 acre active and passive recreation park with five softball fields, five soccer fields, ten tennis courts, cover roller hockey rink, preserved wetland areas, .5 mile nature trail, three restroom /concession buildings and parking. STREETSCAPE 6 OTHER RELEVANT EXPERIENCE Aden House Sheetscape, Sunny Isles Beach, Florida - Project Manager. Right -of -way improvements project which included approximately 550 linear feet of roadway. B &A was requested to upgrade the existing ROW conditions to compliment other redeveloped areas of Collins Avenue. The scope of improvements includes on 8' wide specialty paver sidewalk with waving bands of concrete pavers, a new six foot fall buffer /retaining wall, decorative stone columns, a vehicular gate system for an adjacent private condominium parking area, a bus shelter, landscaping, landscape fighting and a complete upgraded irrigation system. North Flogler Parking, Homestead, Florida - Landscape Architect. Responsibilities included preparation of construction drawings and construction services for landscape and hardscape improvements for a new parking lot in a downtown urban area. 95th Sheet Sheetscape Improvements, Surfside, Florida - Landscape Architect. worked on design synthesis: prepared design development paving patters: coordinated regulatory permitting through Florida Department of Environmental Perfection and Florida Fish and wildlife: and prepared landscape and hardscape construction drawings for sheet improvements. SW 4th Sheet Sheetscape Improvements, Homestead, Florida - Landscape Architect. Professional responsibilities included preparation of construction drawings end construction services for landscape and hardscape improvements to one -half mile of roadway in an urban residential neighbor. Beautification Master Plan, Miami Lakes Florida - Landscape Architect. Performed analysis of existing infrastructure and free canopy data: performed field visits and prepared Town wide master plan vision for aesthetic improvements for the next fifty years. Pompano Beach Public Safety, Pompano Beach, Florida - Landscape Architect. Responsibilities included bidding assistance for architectural, civil and landscape architectural renovations to an existing municipal building. Lauderdale Lakes Sheetscape Master Plan, Lauderdale Lakes, Florida - Responsibilities included management of junior landscape architects and over saw design synthesis for streetscape master plan including landscape and hardscape treatment within the right - of -way as well as gateway feature design. West Palm Beach Gateway 8 Beautification, West Palm Beach, Florida - Responsibilities included project manager reporting to City staff; overseeing data collection and base mapping by junior landscape architect; gateway design synthesis; landscape master plan for fifteen miles of roadway: public presentations: and presentations to the City Commission. Tamarac Downtown Sheetscape, Tamarac, Florida - Activities included over seeing junior landscape architects to take a conceptual master plan, completed by others, and developing construction drawings for new main sheet streetscape including drainage improvements, new roadway and curbing, specialty roadway and pedestrian paving, site furniture, landscape and irrigation. Broward County Greenways Corridor Design, Broward County, Florida - Prepared construction drawings from conceptual signage design; prepared bench, bike rack, bus shelter and hash receptacle layout plans: prepared landscape construction drawings for fifty mile multi - purpose greenway path. CONTINUING PROFESSIONAL SERVICES I RFQ NO. I4 -07-02 IJ F EDUCATION Bachelor of Architecture. Syracuse University. 1991 STAFFING RESUMES BERMELLO AJAMIL & PARTNERS, INC. ScofBakos Partner, Principal Designer Professional Design Experience Scott Bakos has over 18 years of architectural experience with a variety of project types. His experience includes work on residential projects for public and private clients, commercial office, transportation, military facilities, and maritime /waterfront projects. Mr. Bakos has also been involved in several projects in the Middle East in Dubai and Kuwait. His responsibilities include developing close working relationships with clients and maintaining involvement with all disciplines of the project. Scott is also Managing Director of our Fort Lauderdale office, overseeing a staff comprised of architects, designers, administrative and support personnel. PARK AND RECREATIONAL EXPERIENCE South City Beach Park and Scavo Park, Hallandale Beach, Florida - Principal Designer - Responsible for the architectural design on three City of Hallandale Beach Parks. The design of these parks include, but are not limited to, recreational facilities, playground structures, site furniture, parking, vehicular and pedestrian circulation and interaction, fighting, overhead structures, and restroom facilities. The maintenance, reuse- and relocation of appropriate vegetation and amenities will be provided if applicable. B &A provided a full set of design development as well as construction documents packages for each park. B.F. James Park & Aquatic Facility, Hallandale Beach, Florida - Project Manager /Principal Designer. This project encompassed the complete redevelopment of an underused existing neighborhood park through extensive public input and master plan development. B &A developed an extensive program for the new park including a new community swimming facility, basketball courts, picnic areas, exercise stations and an expanded playground. In addition, to meet City code requirements, the park and buildings were designed for LEED Certification. B &A managed the LEED Certification and led the design team through the certification process. B &A developed various architectural altematives for the aquatic swim building. The architectural style of this facility will serve as the bases for the design of all public buildings in future City parks. Although relatively small, the new pool will serve the community's recreational needs and includes a beach entry feature and three lap lanes which can be modified for swim health classes. The park was designed utilizing numerous CPTED principles. George Brummer Park, Pompano Beach, Florida - Project Designer for all buildings as part of the Master Plan and park design improvements. Highlands Community Center, Deerfield Beach, Florida - Project Manager. Design of a new 3.500 SF Community Center which was inserted into the existing 2.16 acre triangular park. The main multi - purpose space can be divided into (2) two separate spaces that accommodate a variety of uses at the some time. The facility has a dedicated service area for catering. Site improvements include additional landscaping, new sidewalks to the building (main entry / front and a separate service / back of house( and new shade over the existing playground area. The building is designed to accommodate emergency operation communications for the community before, during and after a hurricane. Gaines Park Community Center, West Palm Beach, Florida - Project Manager for a 10.000 SF Multi- purpose community center that includes a variety of public use spaces for meetings, large banquet / events and classes. Key aspect included the integration of the new facility into the existing structures and open spaces of Gaines Park. In addition, B &A renovated the existing North Wing that accommodates additional classrooms, meeting rooms, full working kitchen, audio recording studios and offices. OTHER RELEVANT EXPERIENCE Pompano Beach Boulevard -Kiosk Building, Pompano Beach, Florida - Project Manager of the transformation of on existing one story storage shed into a beach concession building. B &A was retained by the CRA to analyze the existing structure and transform the building both functionally C� CONTINUING PROFESSIONAL SERVICES I RFO NO. 14-07-02 84 O STAFFING RESUMES BERMELLO AJAMIL & PARTNERS, INC. Scott Bakos Partner, Principal Designer and aesthetically into a prime destination for beach amenities for the public. The program includes restrooms and three different concession venues. Ali were designed into the existing footprint of the building: the building carefully integrated into the new Pompano Beach Improvements design along a prime pedestrian pathway with large deck area for cafe style tables and chairs. Public Safety Complex, Pompano Beach, Florida - Project Manager for the preparation a due diligence report for the existing 60,000 SF Public Safety Facility and 10,000 SF Fire Administration building that included the assessment of the existing exterior building conditions to understand the key problems related to the exterior "skin', finish, and fenestration waterproofing. Provided recommendations for improvements to the exterior facade and provide cost estimates for said improvements. Utilities Field Services Complex Design /Build, Pompano Beach, Florida - Project Manager. Design for the replacement of an existing operations and administration complex for the Utilities Operations Division of the City of Pompano Beach. The project includes the demolition of existing buildings and surrounding supporting structures. The new buildings, designed as a sustainable building under the current version LEED Certification, includes offices, conference rooms, training space, locker rooms, restrooms, storage and shop areas for various work related activities. The project also includes parking areas for staff as well as City vehicles and equipment. Hillsboro Inlet Bridge Aesthetic Improvements, Pompano Beach, Florida - Project Manager. Provided aesthetic improvements to the existing Hillsboro Inlet bascule bridge, by incorporating a series of new elements as well as enhancements to existing areas of the bridge to provide a strong visual impact as a gateway from the north into Pompano Beach. The bridge improvements included: a Vertical Element, Barefoot Mailman Sculpture: a new crash wall, New guardrails and sidewalk Pedestrian Lighting; and a two Story Tender House. fire Training Tower Exterior Improvements, Pompano Beach, Florida - Project Manager for the preparation of design, construction documents and specifications for the complete replacement of all existing door, windows and shutters for both the ground floor office / classrooms and training tower to meet current Hurricane codes. Scope includes an existing conditions assessment and design of complete exterior fenestration assessment. Special attention was made for the Training Tower in insure the new design would complement the specific training exercises performed within the tower. In addition to bringing all of the doors, windows and shutters up to code, the measure were taken to prevent water intrusion into the training tower spaces and stairwell. Emergency Generator Services Package, Pompano Beach, Florida - Project Manager. Prepared the design and construction for Emergency Generators for (5) five existing City of Pompano Beach Critical Use Facilities. Scope includes (1) one permanent Emergency Generator for (2) two existing Public works facilities and (3) three temporary Emergency Generators for existing Community / Civic Centers in Pompano Beach. Broward Health - Health Care Clinic, Fort Lauderdale, Florida - Project Manager for the overall project design, layout and architecture from concept thru the DRC Process (Site Plan level II) with the City of Fort Lauderdale for the design of a new one story homeless clinic. The new modem facility will be twice as large as the existing homeless facility; providing greater efficiency in building layout, more exam rooms and better patient privacy. Wiley Street Redevelopment, Hollywood, Florida - Project Manager. Provided a design criteria package for 2 street blocks for a design /build RFP package. The program called for the development of low income housing. Mr. Bakos and his team produced the design of 34 units comprised of 1, 2 and 3 bedroom apartments, townhomes and single family homes and a small community center. Miami -Dade Water and Sewer Department Headquarters Facility, Miami, Florida - Project Designer. Prepared project program, master plan, schematic design and final design criteria documents for the project. Included project phasing and relocation plans for over 800 staff that would eventually occupy the new headquarters building. Miscellaneous Services Contract for the City of Pompano Beach, Florida - Project Manager servicing the City of Pompano Beach for a variety of miscellaneous professional services including Architecture MEP and Structural Engineering work. Miscellaneous Services Contract for the City of Pompano Beach CRA, Pompano Beach, Florida - Project Manager servicing the City of Pompano Beach for a variety of miscellaneous professional services including Architecture MEP and Structural Engineering work. Miscellaneous Services Contract for the City of Deerfield Beach, Florida - Project Manager servicing the City of Deerfield Beach for a variety of miscellaneous professional services including Architecture MEP and Structural Engineering work. Cba , "., _ CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14-07-02 85 EDUCATION Bachelors of Architecture. University of Tennessee. 1986 REGISTRATION State of Florida Registered Architect, AR92877 STAFFING RESUMES BERMELLO AJAMIL & PARTNERS, INC. Todd Osborn, RA, NCARB, LEED AP Senior Associate, Architect & Construction Administrator Todd Osborn has over 22 years of design, construction, project and program management experience with public facilities including state prison facilities ranging from minimum to maximum security, municipal parks, state parks facilities, inns and conference centers, education facilities, libraries. National Guard armories and training ranges, and infrastructure projects. Expertise includes extensive experience leading multi - discipline project teams on complex projects as both an owner's representative and as the designer. Responsibilities have included the development of program procedures and documents, program and project scope definitions, schedule and budget requirements, and tracking systems. RELEVANT EXPERIENCE City of Miami Beach Forks i Facilities Program, Miami Beach, Florida - Program Manager. Lead the start-up of the City's Capital Improvement program. and managed its operation for 3 years. Serving as the Owner's Agent, was responsible for establishing program controls and procedures, followed by Design and Construction management of multiple concurrent projects. The program consisted of 18 individual Municipal projects. Program responsibilities included management of the City's Architectural and Engineering Consultant contracts, Construction Contracts, documentation of the Program work Plan, Program Master Cost Model, and coordination of events among various departments internal to the City. Responsible for presentations to the City Commission and G.O. Bond Oversight Committees on behalf of the City's CIP Department. Example projects include the following: CW r.....,... Public Safety Complex, Pompano Beach, Florida - Architect. A due diligence report for the existing 60.000 SF Public Safety Facility and 10.000 SF Fire Administration building that included the assessment of the existing exterior building conditions to understand the key problems related to the exterior "skin ", finish, and fenestration waterproofing. Provided recommendations for improvements to the exterior facade and provide cost estimates for said improvements. Pompano Beach Boulevard -Kiosk Building Improvements, Pompano Beach, Florida - Architect for the transformation of an existing one story storage shed into a beach concession building located east of Atlantic Boulevard in the heart of Pompano's prime beach district. B &A was retained by the CRA to analyze the existing structure and transform the building both functionally and aesthetically into a prime destination for beach amenities for the public. The program includes resirooms and three different concession venues. Ali were designed into the existing footprint of the building; the building carefully integrated into the new Pompano Beach Improvements design along a prime pedestrian pathway with large deck area for cafe style fables and chairs. CONTINUING PROFESSIONAL SERVICES I RFO NO. 14-07-02 ;Dl Miami Beach Golf Club, Miami Beach, FL State of Tennessee Registered Flamingo Park Swimming Pool, Miami Beach, FL Architect, 0021953 Normandy Isle Park and Pool, Miami Beach, FL CERTIFICATIONS Miami Beach Regional Library, Miami Beach, FL NCARB Certification Convention Center ADA Improvements, Miami Beach, FL LEEDS AP Scott Rakow Youth Center, Miami Beach, FL SPECIALIZED TRAINING TN State Parks Factiites Management, Department of Environment d Conservation, Nashville, URS Program Manager Tennessee - Assistant Director. Primary responsibility for the development and management Certification Training 2005 of all capital outlay and capital maintenance projects for Tennessee State Parks. Developed annual capital outlay budgets for planned projects, managed design and construction contracts, monitored progress of construction against schedule and budget. Developed and implemented a direct order contracting system to save both time and money on small State Park Maintenance projects. Projects ranged from small maintenance projects to new Inn and Conference Centers. CW r.....,... Public Safety Complex, Pompano Beach, Florida - Architect. A due diligence report for the existing 60.000 SF Public Safety Facility and 10.000 SF Fire Administration building that included the assessment of the existing exterior building conditions to understand the key problems related to the exterior "skin ", finish, and fenestration waterproofing. Provided recommendations for improvements to the exterior facade and provide cost estimates for said improvements. Pompano Beach Boulevard -Kiosk Building Improvements, Pompano Beach, Florida - Architect for the transformation of an existing one story storage shed into a beach concession building located east of Atlantic Boulevard in the heart of Pompano's prime beach district. B &A was retained by the CRA to analyze the existing structure and transform the building both functionally and aesthetically into a prime destination for beach amenities for the public. The program includes resirooms and three different concession venues. Ali were designed into the existing footprint of the building; the building carefully integrated into the new Pompano Beach Improvements design along a prime pedestrian pathway with large deck area for cafe style fables and chairs. CONTINUING PROFESSIONAL SERVICES I RFO NO. 14-07-02 ;Dl lr `. NG RESUMES BERMELLO AJAMIL & PARTNERS, INC. Todd Osborn, RA, NCARB, LEED AP Senior Associate, Architect & Construction Administrator Broward Health - Health Care Clinic, Fort Lauderdale, Florida - Architect. Design of a new one story homeless clinic. The new modern facility will be twice as large as the existing homeless facility; providing greater efficiency in building layout, more exam rooms and better patient privacy. Mr. Osborn and the team worked closely with the user groups at Broward Health, developing several architectural styles and themes for the exterior of the building. Emergency Generator Services Package, Pompano Beach, Florida - Architect for the design and construction for Emergency Generators for (5) five existing City of Pompano Beach Critical Use Facilities. Scope includes (1) one permanent Emergency Generator for (2) two existing Public Works facilities and (3) three temporary Emergency Generators for existing Community / Civic Centers in Pompano Beach. City of Pompano Beach Fire Training Tower Door and Window Replacement, Pompano Beach, Florida - Project Architect for the replacement of all building windows with impact resistant window systems and replacement of all exterior doors. Pod Everglades Customs House Renovations Phase 1, Fort Lauderdale, Florida - Project Manager /Architect. This building is listed on the National Register of Historic Places. Phase I involves on assessment of existing conditions and recommendations for renovations to make the budding useful for the Port in keeping with requirement of the National Register of Historic Places. Pre -Trial Detention Center 40 Year Recertification Repairs and Expansion, Miami, Florida - Project Manager. The scope of services includes renovation of an existing dormitory space to expanded kitchen area, renovation of the existing kitchen and warehousing area, conversion of food service production to a retherm process, perform an assessment of the building envelope and make recommendations for needed repairs, and a partial re -roof of the facility. The team is comprised of URS. Architects, Structural Engineers, Mechanical, Electrical and Plumbing Engineers, and a food service consultant. Miami -Dade County Public Schools, ADA and Site Civil Program, Miami, Florida - Deputy Program Manager. Provided oversight and general management of the School Districts ADA and Site Civil projects. Program responsibilities included management of the District's Architectural consultants. Construction Managers, and coordination of events among various departments internal to the District. Additional responsibilities include assisting the District's ADA office with monthly status reports for presentation to upper management. Capital Projects Management, Dept. of Finance d Administration, Tennessee Department of Correction, Nashville, Tennessee - Program Coordinator. Responsible for the Department of Correction's eight year capital program valued at approximately $350 million, during which he Oversaw the management of design and consulting contracts for maintenance, renovations, additions, and new construction projects for Tennessee's prison system. Responsible for the management of the design process, contract writing, programming, project initiation with designers, directing designers in the best interest of the State- document reviews and cost analysis at each phase of the design process and directing value engineering efforts and field resolution of problematic issues during construction, and the training of new project management staff. Hillsboro Inlet Bridge, Pompano Beach, Florida - Architect. S &A provided aesthetic improvements to the existing Hillsboro Inlet bascule bridge, by incorporating a series of new elements as well as enhancements to existing areas of the bridge to provide a strong visual impact as a gateway into Pompano Beach. The bridge improvements included: a Vertical Element, Barefoot Mailman Sculpture; a new crash wall, new guardrails and sidewalk; pedestrian lighting: and a two story tender house. FDOT District 4 Amtrak Station, Fort Lauderdale, Florida - Architect. B &A performed an assessment of the building that was in need maintenance end repair. Waked with historic preservation architect to identify areas to rehabilitate and restore. The B &A team provided written program. corresponding visual documents and prescriptive architectural items fa rehabilitative construction fa this For, Lauderdale Historic Building. Utilities Field Services Complex Design /Build, Pompano Beach, Hortdo - Architect. Design for the replacement of an existing operations and administration complex. The project includes the demolition of existing buildings and surrounding supporting structures. The new LEED buildings include offices, training space, locker rooms, restrooms. storage and shop areas for various work related activities. C� CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14-07-02 87 EDUCATION Master of Architecture, University of Florida. 1993 Bachelor of Architecture. University of Florida. 1986 Cba rr.r.. ......k STAFFING RESUMES BERMELLO AJAMIL & PARTNERS, INC. Jorge Ferrer Partner, Director of QA /QC Mr. Feuer has over 20 years of experience in architecture and interior architecture for a variety of clients, including government, commercial office, parks, and hospitality facilities. He has served as project manager coordinating project teams and engineering consultants from project inception through implementation. One of Mr. Ferrer's primary responsibilities is to ensure that all projects developed at B &A go through our rigorous document review and coordination process. He, along with his team of professionals, reviews all projects for completion, correctness, and compliance with established design criteria and governing codes. RELEVANT EXPERIENCE Morgan Levy Park & Community Center, Doral, Florida - QA/QC. Reviewed an design and construction documentation relating to the renovation of this 14-acre Park which incorporates an active and passive community center including tennis courts, a recreation building and a parking lot. Scope of work included plan development, design documents, maintenance standards and assistance in the bidding and negotiation phases as well as administration of construction. Wlttkop Park Master Plan, Homestead, Florida - QA /QC. Redevelopment of a 2.5 acre park located in the City of Homestead, Florida. The park includes two basketball courts, toddler and pre teen playground areas, two handball courts, a walking trail and restroom facilities. This is the second neighborhood park. James Archer Smith Park, Homestead, Florida - QA /QC - Reviewed all design and construction documentation relating to this project. Scope of work included Planning, landscaping and architectural designs to renovate and revitalize 4.73 -acre park. Includes a splash pod, pinic shelters and fitness station. Solvadore Park and Tennis Center Improvements, Coral Gables, Florida - Provided programming, park master planning, schematic design and construction documentation for this tennis center and public park located in Coral Gables, Florida. The facility has 13 tennis courts including eight clay courts and five hard /asphalt courts and a tennis center that houses restrooms, showers and a tennis pro-shop. In addition, the park features a picnic pavilion, playground, tot lot, picnic area and street furniture. Athalie Range Park Improvements, Miami, Florida - Provided architectural and engineering services for the development of construction documents, bid /negotiations and construction administration. The project scope included the remodeling of the existing pool facility, including office, bathrooms, pool and pool equipment. Flodda Department of Transportation (FOOT) District 4, Amtrak Station Historic Rehabilitation, Fort Lauderdale, Florida - QA /QC. Performed quality control services associated with the Rehabilitation/ Repair /Restoration of the Historic Ft. Lauderdale Amtrak Train Station in Broward County. Miami-Dade Expressway Authority (MDX) Headquarters, Miami, Florida - Project Manager responsible for all phases of this project, from initial conceptual design through construction phase. This awardwinning 14,000 SF building was designed to house a stateaf -the -art traffic center, a boardroom and general office space. The existing one -story building was modified to create a gateway into the new building and operated uninterrupted during construction. Miami International Airport, MIA Mover Automated People Mover, Miami, Florida - As the Design Review Coordinator for the Construction Services Team jFFCSTj, Mr. Feuer leads a team of architects and engineers performing design reviews of the design -build team's documents of the fixed facilities design of this $259 million project which includes the People Mover Station, Guideway and Traction Power Sub - Station currently under construction. As the Owner's representatives, Mr. Feuer and his team reviewed all design and construction documentation including Architectural, MEP, Structural. Civil and Landscape Architecture drawings. RFls. calculations, schedule, pay applications, waivers, and change orders. CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14 -07 -02 4!7 EDUCATION Master in Urban Planning. University of Puerto Rico, 1979 Master in Architecture. Tulane University, 1974 Bachelor of Architecture. Tulane University, 1974 COMMUNITY INVOLVEMENT Board of Governors Greater Miami Chamber of Commerce Greater Miami Chamber of Commerce Executive Transportation Committee Contour Supportive Housing, Board immediate past Chair 20D9 Leadership Florida, Council of Advisors. Past Regional Chair and Board of Regents Trust for Public Lands Policy Advisory Council St. Thomas the Apostle Building Committee Chair TEAMFL (Toll Expressway Authorities Members of Florida(. Member STAFFING RESUMES BERMELLO AJAMIL & PARTNERS, INC. Teresita Garcia Partner, Director of Public Involvement Tere Garcia has more than 25 years experience in the fields of planning, public participation, governmental and media relations. Eighteen of those years have been spent specifically in the public involvement field concentrating on transportation and infrastructure projects. B &A has provided public involvement services to governmental agencies such as the MiomFDade Expressway Authority (MDX), the Honda Department of Transportation. MiamkDade Transit Agency and Miami -Dade Water and Sewer Department. Ms. Garcia oversees all public outreach activities for planning and design projects for MDX including educational and informational efforts dealing with the implementation of Open Road Toning in the MDX System. She has been an integral part of the visioning process used to perform the two updates to the MDX Long Range Master Transportation Plan and has delivered a successful program of public outreach for planning and design projects. Ms. Garcia has established the guidelines for public involvement followed by MDX designed after State requirements but tailored to the rapid pace and fast delivery of projects by MDX. She was Principal -in- Charge of FOOT District Su, Distric"cle Public Involvement Contract which includes public involvement services for over 100 planning or design projects since the onset of the contract in 2006. Ms. Garcia is also the Principakin- Charge of public involvement services for the Miami -Dade Transit MIC Ecrfington Heights Connector and the Reconstruction of SR 9 for FDOT District 4. Ms. Garcia directs all community and public outreach programs for public as well as private clients. She also acts as a liaison between B&A and Miami -Dade County and its municipalities in regulatory, permitting and public affairs matters. RELEVANT EXPERIENCE Pinecrest Community Center Master Plan, Miaml -bode County, Florida - Public Involvement Director. B &A was responsible for the logistics of community forums as well as the notification of property and business owners within the project area. The team designed all the written communications to the public. Tampa Channelside Master Plan, Hillsborough County, Florida - Public Involvement Director. B &A prepared the written communications to the public. including drafting and designing all collateral. The B&A team managed the logistics for the public open house, and created the analysis report of the public opinion and preference on the Master Plan. South Dade Neighborhood Development Concept Plans ("The Moss Plan ") - Project Director. Strategic planning study for Miami -Dade County's Office of Community Development, won Florida Chapter of the American Planning Association Award of Merit. Addresses redevelopment of 14 neighborhoods in South Dade damaged as result of Hurricane Andrew. working closely with County staff, successfully directed intense public participation campaign culminating in fifty meetings with neighborhood residents and community-based as well as religious organizations. The Moss Plan pointed informational efforts in the right direction while transferring ownership of the plan to the communities involved. Pump Station Improvement Program - Directed the Development Community Coordination office within the Miami -Dade water & Sewer Department Pump Station Improvement Program. This was used to reach out to inform builders, developers, realtors, lending institutions and potential investors on how WASD's improvement program would affect them. Focused on conflict resolution and designed a work schedule that strived to satisfy the needs of all involved. Broward County Office of Environmental Services Neighborhood Improvement Project - Public Involvement Project Manager. Responsible for the participation of four unincorporated Broward County neighborhoods - Franklin Park, Washington Park, St. George West and St. George East. Worked closely with the Design and Construction Team to effectively convey information to general public and special interest groups. Permitting Guidance / Assistance - Recognized for her work with local government particularly as it relates to building and zoning matters. While at the Greater Miami Chamber of Commerce CONTINUING PROFESSIONAL SERVICES I RFO NO. 14 -07 -02 89 e O e O e �1"Mu RESUMES BERMELLO AJAMIL & PARTNERS, INC. Teresita Garcia Partner, Director of Public Involvement authored the Guide to the Building Permit Process for the Unincorporated Areas of Metropolitan Dade County, which outlines the building permit process and presents a description of the permitting agencies responsibilities. This guidebook was prepared as a tool to facilitate the regulatory and permitting process to assist expanding companies and new finns relocating to the area. Transportation Projects, Greater Miami Director of Planning Development and Transportation - Director for Planning Development and Transportation. worked with economic development organizations in the review and analysis of local and state development regulations and acted as a liaison between regulatory agencies and the business community. Led the staff effort in the creation of broad -based business and community transportation coalitions and directed all committees of the transportation group. Instrumental in the planning and implementation of the first Transportation Summits established by the Chamber. Greater Miami Chamber of Commerce Transportation Summit - Responsible for organization and coordination of the Summit and community outreach program. Encompassed setting up meetings with grassroots organizations throughout MiamFDode County to present together with representatives from the Florida Department of Transportation. MPO. Miami -Dade County Public Works Department and Miami -Dade Transit Agency the specific projects that are planned for each area. FDOT District 6, Public Involvement Dlstdctwide Contract, Miami -Dade County & the Keys (2006 - 2011) - Project Manager overseeing 8 pubic involvement specialists charged with providing outreach services in relation to planning and design projects for FDOT. Ms. Garcia led strategic efforts after recent changes in legislation for Community Outreach related to Improvements to the historically - designated 57th Avenue Corridor from US 1 Road to SW 8th Street. B &A successfully delivered public involvement programs for over 100 design projects for FDOT, District Six. Miami -Dade Expressway Authority, Miami -Dade County, Florida - Public Involvement Director for General Engineering Consultant. Responsible for developing strategies and overseeing all public involvement and community awareness programs throughout the master planning and final design phases of MDX's projects. This has included strategic and extensive community awareness campaigns to reach the impacted communities using workshops, presentations to elected officials and Community Councils, open house, community meetings, speaker's bureaus, fact sheets, newsletters. website, PowerPoint presentations and public hearings. Highlights of current and past efforts include: MDX Long Range Master Transportation Plan (2025 and 2035 Update) - Every five years MDX updates their Long Range Transportation Plan and identifies new projects through a visioning process with its Board of Directors, transportation partners and the public. This update included the use of a new innovative preference survey technology (Turning Point) with the Board Members to gather and present live results of priorities for all presented projects. Initial tasks included working with the technical planning team on a needs assessment of transportation needs in Miami -Dade County and the identification on potential projects where MDX could be a catalyst in providing mobility to the region. Public outreach consists of providing public involvement and information through the concept planning phase including interagency coordination and outreach to stakeholders in the area. MDX Project Development and Environment Studies (PD&E) - Ms. Garcia oversees or leads the public involvement programs for the following PD &E's , making sure that project activities are in compfance with all federal and state public involvement guidelines and assists with the public affairs programs for the projects. These studies include: • SR 924 /Gratigny Extension West to the Turnpike Project Development & Environment Study (PD &E) • SR 874 /Don Shula Ramp Connector to SW 128 Street State Environmental Impact Report (completed) • SR 924 /Gratigny Extension East to 1 -95 inclusion into the MPO 2030 Long Range Plan fPD &E) • US I Express (Managed Lanes) PD &E • SR 836 Improvements from NW 57th Avenue to 17th Avenue State Environmental Report (completed) MDX SR 874 State Environmental Report (SEIR) and final Design - Led public involvement efforts through the SEIR which included the preparation and implementation of a Public Involvement Plan for the proposed improvements to SR 874. The SEIR is an environmental impact study that evaluates alternatives for corridor improvements and identifies mitigating measures where necessary as well as suggests specific projects and alignments. This project included the establishment of a close working relationship with all district elected officials, the creation of a Citizens Advisory Committee, multiple community presentations and two Public Hearings. As the lead Public Information Officer during the final design phase for both projects now under construction, a process was designed to obtain community confirmation for noise walls following state guidelines with meetings, surveys and the preparation and execution of noise wall agreements in coordination with MDX's legal counsel. CONTINUING PROFESSIONAL SERVICES I RFO NO. 14 -07 -02 90 11 a STAFFING RESUMES BERMELLO AJAMIL & PARTNERS, INC. Patricia Suau Public Information Specialist Ms. Suau has over nine years of experience in the corporate sector, primarily providing product marketing and promotions. She is experienced in developing, organizing, and executing global multi -phase communication campaigns as well as establishing quarity business relationships with people from diverse backgrounds and cultures. Responsibilities have included communications, project management, branding, and budget administration. She is an experienced researcher and is fully bilingual in English and Spanish. RELEVANT EXPERIENCE Pinecrest Community Center Master Plan, Miami -Dade County, Florida - As part of the Public Involvement team, Ms. Suau was responsible for the logistics of community forums as well as the notification of property and business owners within the project area. She designed all the written communications to the public. Tampa Channelside Master Plan, Hillsborough County, Florida - Public Involvement specialist responsible for the written communications to the public, including drafting and designing all EDUCATION collateral. Ms. Suau managed the logistics for the public open house, and created the analysis Bachelor of Ads in report of the public opinion and preference on the Master Plan. International Relations Florida International University, Miami -Dade Expressway Authority (MDX) - State Road (S.R.) 836 /Dolphin Expressway Southwest Miami. FL, 2009 Extension Project Development b Environment Study, Miami -Dade County, Florida - Ms. Suau is responsible for the portion of public involvement which involves drafting written communications Bachelor of Ms in Fine Arts for the public, as well as scheduling of meetings and follow up with residents and interested Florida Intemational University, parties. As Public Information Specialist, Ms. Suau is responsible for the notification of property Miami, FL, 2010 and business owners within the project corridor and the scheduling of briefings to elected and appointed officials as well as government and municipal agencies. Associate of Arts Maryland Institute, College of Art Miami -Dade Expressway Authority (MDX) - Final Design Phase for State Road (S.R.) 836 /Dolphin (Ranked Top 5th Art School in the Expressway Interchange Improvements at NW 87th Avenue, Miami -Dade County, Florida - As Nation), 2003 -2004 Public Information Specialist, Ms. Suau has been responsible for the portion of the design project dealing with noise barrier walls including the identification of benefited public, preference surveys and notifications as well as scheduling of meetings and follow up with residents. Ms. Suau is responsible for the notification of property and business owners within the project corridor and the scheduling of briefings to elected and appointed officials as well as government and municipal agencies. Miami -Dade Expressway Authority (MDX) - State Rood (S.R.) 87E /Don Shula Expressway Mainline Improvements from Kendall Drive to the Palmetto Expressway Design -Build Project, Miami -Dade County, Florida - Public Information Specialist responsible for keeping the community informed of construction progress, which involves close coordination with the construction team, attendance to weekly progress meetings, preparation of lane /road closure advisories and other notices in English and Spanish, as necessary. She also conducts field visits to note construction impacts on the community and discuss any individual concerns with property owners. CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14 -07 -02 91 STAFFING RESUMES GIBBS LAND SURVEYORS Stephen K. Seeley, P.S.M. President Gibbs Land Surveyors - Hollywood, FL Education: Mr. Seeley has over 35 years of experience in the field of Land Surveying, including boundary University of Miami and topographic surveying, subdivision construction layout, survey project management, field Coral Gables, FL, 1974 and office team management and special survey projects coordination for FDOT and SFWMD contracts. He has acquired most of his experience in Broward County and has over 20 years Registration: experience in the Hollywood area. Having a command of current technologies, he is well Professional Surveyor and qualified in the use of survey -grade GPS and Digital Data Collection. Mapper No. LS4574 State of Florida. 1988 Relevant Experience: Areas of Expertise: Everglades National Park - "Hole -In- The - Donut" invasive species eradication project for the Survey -Grade GPS National Park Service. Precise Leveling and Real-Time Kinematic(RTK) GPS was used in the High Precision Control mapping of invasive plants, the topographic survey of the surface after removal and scrape - Subdivision Surveying down, and the mapping of indigenous plant species. Boundary & Topographic Surveying City of Miami Beach - "Beochwalk" on South Beach Location of dunes and vegetation using RTK GPS for the mapping and construction of boardwalk extensions and crossings. Years Total: 35 South Florida Water Management District - Specific Purpose Survey for litigation support, including Professional References: Expert Witness Testimony, Boundary Surveys of District -owned Parcels, Topographic and As -built I. Stephen Vrabel, P.S.M. Surveys of water Control Structures. 954 - 868 -1553 2. Douglas Taylor, P.E. Coral Ridge Properties - Boundary and Topographic Surveys for original subdivision layout. Sohn Do2697 3. John D P.S.M. construction layout for roads and utilities. These subdivisions comprise all lands west of University -2594 561- 392 -2594 drive, north of the C -14 canal and south of Royal Palm Drive in the City of Coral Springs. Lands in the City of Coral Springs north of Wiles Road from Riverside Drive West to the Sawgrass Expressway - Topographic Survey of 3000 acres for subdivision design. Broward County Expressway Authority - Control and Right -of -way Surveying for construction of the Sawgross Expressway. Post - Construction hydrographic and cross sections of perimeter canals for litigation forensic study. Florida Department of Transportation - Harrison Tract Mitigation Banking - Topographic. As -built and Precise Leveling for a 200 acre crocodile habitat. Construction Monitoring and restoration mapping utilizing RTK GPS. Included in this project was topographic survey and lake soundings ( hydrographic surveying) for fill quantity and forensic study. Miami -Dade County Aviation Department - Provided high - precision control using Static GPS and various other GPS and Topographic services for Miami Intemational and General Aviation airports. Notional Oceanographic and Atmospheric Administration (NOAH) - Established underwater survey -grade control for Mapping coral reef damage at Looe Key Coral Reef Preserve. City of Coral Springs - Dells / Meadows Drainage Study - Providing full Topographic Survey data, including drainage structures, swales, roads, driveways and visible utilities - currently surveying individual "basins' or design segments on an as- funded basis. These two subdivisions are the oldest in the City, and the original storm water design is failing. The survey data is providing accurate horizontal and vertical data that can also benefit the City's GIS program, providing these current as -built conditions. City of Hollywood - Project Surveyor for various municipal and special projects - providing to the City and design /civil engineers survey data, (topographic and as -built formats) for water and sewer infrastructure and treatment plants. Providing to the City, as needed. Specific Purpose Surveys in various forms: As -built and Topographic Surveys of streets and alleys for utility and drainage improvements. (Currently providing horizontal and vertical as -built survey data for the Hollywood Beach Beautification Project.) Specific Purpose Surveys for beach improvements, meeting the requirements of FDEP, prepared as Coastal Construction Line Surveys or Mean High Water Line surveys, utilizing topographic and hydrographic survey disciplines. CONTINUING PROFESSIONAL SERVICES I RFQ NO. I4 -07 -02 OF O e e O 0 e s s s STAFFING RESUMES GIBBS LAND SURVEYORS Mark E. Berry, P.S.M. Project Surveyor Gibbs Land Surveyors - Hollywood, FL Education: Mr. Berry has over 34 years of Professional Surveying experience. A third generation surveyor, University of Florida & Mr. Berry has the unique distinction of being in a family that has been at the forefront of land MiamFDade Community development in the City of Hollywood since the 1930s. Obviously, his local historical knowledge is College - Surveying unsurpassed. For the past 20 years, he has applied his expertise in underground utility installations Courses and is the Consulting Surveyor for the Broward County office of AT &T. Registration: Relevant Experience: Professional Surveyor and Mapper No. LS4283 Project Surveyor for the firm of M.E. Be and Associates - Hand drafting j y Berry ng and computer drafting State of Florida, 1986 of surveys. Feld production of Boundary and Topographic Surveys, subdivision layout for construction, underground utility installation surveys. Areas of Expertise: Boundary & Topographic Project Surveyor, M.B.C. Consulting Services, Inc. - Surveys - Local historic Owner- Operator of this small business. Mr. Berry's primary client was Bell South. Exclusive surveyor survey knowledge for this Utility's Right -of -way issues, the acquisition mapping and staking of facility installations, Underground utility permitting sketches and construction sketches. Installation Project Surveyor, Stephen H. Gibbs Land Surveyors, Inc. - Years Total: 35 Responsibilities include consultant for Bell South / AT &T Broward County facility locations, mapping and permitting of facility installations on an as- needed, per contract basis. Historic Professional References: knowledge of 20 years of surveying for this utility have made Mr. Berry uniquely qualified to 1. Otis Keene. AT &T 954- 723 -2540 provide survey services on a timely and accurate basis. 2. Hank Coleus. AT&T 95x476-2727 City of Hollywood Consulting Surveyor since 1988 - Topographic surveys of portions of Hollywood 3. Mike Pickle, Florida Boulevard. Topographic surveys of city parks, Topographic surveys of Hollywood Beach for 407-835M41 beautification project, City Parcel Boundary Surveys, as needed. City of Hallandale Beach Consulting Surveyor since 1988 - Topographic surveys of various parcels and city parks, joint venture with the City and Broward County to produce a comprehensive GIs map for the City, surveyed all public Rights-of-way lines for production of controlled overlay of aerial photography. Consulting Surveyor /or AT &T Since 1988 - Production of Topographic and Boundary surveys. Specific Purpose Surveys, field staking and CAD drafting, permit Sketches and Calculations for utility conflicts. Marking and surveying existing underground utilities for mapping and construction permiCing- Cba Partial List of Projects: Project Surveyor - Preparation of Condominium Documents Project Surveyor - Broward County Erosion Control Line Survey Hydrographic & topographic surveying. Project Surveyor - Utility Staking for Bell South / AT &T Project Surveyor - Private development construction staking Project Surveyor - Record Plat Processing Project Surveyor - Topographic and route surveys Boundary Surveys Hydrographic Surveys Utility Stakeout Platting Elevation Certificate Surveys Construction Stake -out CONTINUING PROFESSIONAL SERVICES I RFO NO. 14 -07 -02 93 0 e STAFFING RESUMES GIBBS LAND SURVEYORS Stepben H. Gibbs, P.S.M. Project Surveyor Gibbs Land Surveyors - Hollywood, FL Education: Mr. Gibbs has over 35 years of experience in the field of Land Surveying, including boundary and Associate Degree in topographic surveying, subdNsion construction layout, survey project management, field and Architectural Design, office team management. He has acquired most of his experience in Broward County and has Greenville. S.C. - 1973 35 years experience in the Hollywood area. Having a command of current technologies, he is well qualified in the use of survey-grode GPS, Digital Data Collection and Autocad Automated Drafting. Registration: Professional Surveyor and Relevant Experience: Mapper No. LS4054 City of Hollywood - Project Surveyor for various municipal And special projects - providing to the State of Florida, 1988 City and esign /civil engineers survey data. (topographic and as -bull formats) for wafer and Professional Surveyor sewer infrastructure and treatment plants. Providing to the City, as needed. Specific Purpose No. L3700 Surveys in various forms: As -built and Topographic Surveys of streets and alleys for utility and State of North Carolina drainage improvements. (Currently providing horizontal and vertical as -built survey data for the 1994 Hollywood Beach Beautification Project.) Specific Purpose Surveys for beach improvements, meeting the requirements of Florida Department of Environmental Protection, prepared as Areas of Expertise: Coastal Construction Line Surveys or Mean High Water Line surveys, utilizing topographic and Survey -Grade CPS hydrographic survey disciplines. High Precision Control Subdivision Surveying City of Hallandale Beach- Project Surveyor forvarious municipal and special projects - providing Boundary & Topographic to the City and design /civil engineers survey data. (topographic and asbuilt formats) for water Surveying and sewer infrastructure and treatment plants. Providing to the City, as needed. Specific Purpose Surveys in various forms: As-built and Topographic Surveys of streets and alleys for utility and Years Total: 35 drainage improvements. Prepared the City of Hallandale Beach G.I.S. map of the entire city as well as monumenting and establishing boundaries of the entire city for aerial photography. Professional References: 1. Richard D. Pryce P.S.M. 954- 739 -6400 City of Sunrise - Providing to the City, as needed. Specific Purpose Surveys in various forms: As- 2. Robert Waltz, P.E. built and Topographic Surveys of streets and alleys for utility and drainage improvements. 954 -921 -3900 3. Chuck Buckolew, P.E. Other Municipalities - Project Surveyor for various municipal and special projects - providing to 954 - 558 -2289 the City and design /civil engineers survey data. (topographic and asbult formats) for water and sewer infrastructure and treatment plants. Providing to the City, as needed. Specific Purpose Surveys in various forms: As -built and Topographic Surveys of streets and alleys for utility and drainage improvements. Various Engineering Clients - Project Surveyor for various and special projects - providing survey data. (topographic and as -built formats) for water and sewer infrastructure and treatment plants. Providing, as needed. Specific Purpose Surveys in various forms: As -built and Topographic Surveys of streets and alleys for utility and drainage improvements. Partial list of Projects: City of Hollywood consulting Surveyor since 1968 - Topographic survey of portion of Hollywood Boulevard, topographic survey of all parks within the city limits, topographic survey of Hollywood Beach for beach beautification, numerous parcel surveys for the City, etc. City of Hallandale Beach consulting Surveyor since 1988 - Topographic survey of various site for the City, topographic survey of various parks within the city limits, joint venture with the City of Hallandale Beach and Broward County to prepare a GIs map of the City, surveyed all the right - of -way lines within the City to overlay onto Aerial Photography of the City, etc. Cbe .... Surveying Projects Condominiums Mortgage Surveys Hydrographic Surveys Utility Stakeout Platting Route Surveys Elevation Surveys Site Stakeout CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14 -07-02 94 O O • • • • • • • • • • • O • • • • • O • • • • • • • W 'ArW PROFESSIONAL EXPERIENCE STAFFING RESUMES TRC WORLDWIDE ENGINEERING Derek A. Wassink, P.E., RA., S.1., LEED AP President, Structural Engineering Group Role: Project Principal Office: 3590 NW 5e Street, Fort Lauderdale, FL 33309 Phone: (954) 484-7777 Fax: (954) 484 -7834 E -Mail: dwassink@trcww.com As President of the Structural Engineering Group of TRC Worldwide Engineering, Inc., Mr. Wassink is responsible for managing design teams and project management for both public and private sector clients. Responsibilities include contract negotiations, analyzing work bad and projecting manpower needs, development of plans and specifications, design team management, quality assurance, construction contract administration and project follow- through and coordination with all individuals involved in the successful completion of our projects. Mr. Wassink has more than twenty-six years' experience in the design of municipal facilities, educational facilities, high -rise buildings, healthcare facilities, churches, clubhouses, building restoration, office buildings, roads, bridges, industrial plants, and parking garages. Mr. Wassink, a LEED Accredited Professional, is the Group President of the Structural Group, with offices in Fort Lauderdale, Fort Myers, Fort Pierce, Jacksonville, Sarasota and Tampa, Florida; Atlanta, Georgia; Indianapolis, Indiana, Phoenix, AZ; Dallas, TX; and Nashville, TN. YEARS EXPERIENCE Total Years' Experience: 26 PROFESSIONAL REGISTRATION Registered Professional Engineer: Florida: PE 55303 Pennsylvania: PE 045286 New Mexico : PE 20408 Special Inspectorri threshold Buildings Florida: 7020100 Registered Architect: NY #034567 EDUCATION Master of Civil Engineering/1998 - Villanova University Bachelor of Science in Civil Engineering/1987 - Princeton University PROFESSIONAL AFFILIATIONS American Consulting Engineers Council (ACEC) Member of FEMA - Urban Search and Rescue Florida Task Force 1 -Structures Specialist •ORIDRtDE EEGAEEtIxe Principal m in - Charge for projects that include: • S4.9 million Sullivan Park, Deerfield Beach FL - on the Intracoastal Waterway • S4.3 million Chupco's Landing Community Center - Seminole Tribe of FL, Fort Pierce • Coconut Creek Community Center. 36,000 square foot multi- purpose facility, including gymnasium, lockers, showers, offices, fitness and meeting rooms • $25 million Port St. Lucie Civic Center - 100,000 SF public facility • Wilton Station: $70 million gated community that includes an elegant water feature at the entrance, a quaint landscaped 'Allege lane' with fountains, a multi- level clubhouse with landscaped resort-style pod /spa. and a 300' waterfront boardwalk with gazebos • Ted Thomas Windmill Park • Boynton Beach Intracoastal Park • $20 million Brighton Reservation Public Safety & Administration Campus for the Seminole Tribe of Florida • $8 million, 35,000 sq.ft. Wilton Manors City Hall, Police Station and Emergency Operations facility S35 million, 132,000 GSF, Public Safety Complex for the City of Sunrise, FL (withstand a low Category 4 hurricane) • S6.1 million, 17,500 GSF Fire Station #14 for the City of Marathon, FL (withstand winds of 195 mph) • $3.5 million, LEED Certified Environmental Protection Department Laboratory in Broward County • $38 rtlglon Indiana & Purdue University Athletic Facility, Fort Wayne IN (105,000 GSF athletic facility) • S8 million FAU -Tom Oxley Athletic Center • W Fort Lauderdale Resort Hotel & Residences, a $220 million, 2- tower, 23 -story hotel and residences with a 5- level , 1020 -space enclosed parking garage, located on Fort Lauderdale Beach • O-Club Resort & Residences, a 25 -story, multiuse facility with a 420 -space parking garage, located on Fort Lauderdale Beach CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14 -07 -02 95 I] e e a) E ' ^W r I..L 7R`0 �oun�mt umrrtctuw `ba Y.W... STAFFING RESUMES TRC WORLDWIDE ENGINEERING Jeffrey D. McGee, P.E., S. I. Principal, Division Manager PROFESSIONAL EXPERIENCE As a Pdndpal of TRC Woddwide Engineering, Inc., Mr. McGee has extensive experience in project design for a full range of publicly and privately funded projects including municipal, educational, governmental, institutional, high-rise and commercial work. He has demonstrated his expertise in designs incorporating the full spectrum of engineered materials including wood, aluminum, steel and concrete. With more than twenty-five years' experience, he is able to effectively manage both small and large -scale projects while providing a high level of service to the client. Mr. McGee views each project with a fresh approach and provides functional solutions within budget and on schedule. YEARS EXPERIENCE Principal -inCharge for projects that include: Total Years' Experience: 25 Chupco's Landing Community Center (S4.3 million) - Seminole Tribe of FL, Fort Pierce Indian River State College: PROFESSIONAL REGISTRATION - Building R: Renovation & Black Box Theater - McAlpin Fine Arts Building Registered Professional Engineer: Jonathan Dickinson State Park, Jupiter FL 45944 - Environmental Education Research Center TX 103066 Savannah Club Rec.Bldg.- Renovations, Port SL Lucie MT 18011 PE California Commons Retail Building Special Inspector of Threshold Buildings Renaissance on the River, Ft. Pierce - FL SI 1114 - Mixed use: luxury condominiums, specialty slops & restaurants Promenade Building (mixed use), Port St. Lucie EDUCATION The Moorings- Social Center /Admin. Bldg., Vero Beach (2) Splash Parks, St. Lucie County University of South Florida, 1987 North County Park Pod Building, Indian River County - Bachelor of Science in Civil Engineering Smithsonian Aquarium Building, Vero Beach specializing in Structural South County Park -Phase 11, Indian River County University of South Florida, 1984 Martin County Community Center - Bachelor of Fine Arts Pelican Elem. Multi- Purpose Bldg., Indian River County Thompson Elem. Multi-Purpose Bldg., Indian River Co. PROFESSIONAL AFFILIATIONS Hugh Taylor Birch State Park Restroom Facility, Ft. Lauderdale American Society of Civil Engineers I. Lewis Ellis Memorial Park, Vero Beach American Concrete Institute Hams Field Park & Community Center, Homestead Prestressed Concrete Institute BrnWitch Point Regional Park Fort Myers Beach CONTINUING PROFESSIONAL SERVICES I RFO NO. 14-07 -02 �7 STAFFING RESUMES LOUIS J. AGUIRRE & ASSOCIATES Mr. Louis J. Agume, P.E. is founder and president of LOUIS J. AGUIRRE 6 ASSOCIATES, PA For the last 44 years, the Cam has specialaed in providing sometimes Wllenging solutions to complex designs to various fadfity types such as healthcare, educational, municipal, industrial, comnhercial, private sector, hospitality, judicial, aviation, muhTfamily and housing complexes, tekwmmunitation, transportation, parking garages and structures. marvas, parks, recreatiowL historical restoration and multiple miscellaneous contracts with various clams. Mr. Aguirre bears the overall responsibility for contractual performance, partncuiariy with respect to the Fervid of service and client satisfaction. As the design Principal of the firm, he has participated in the programming, design and supervision of installations and construction in numerous projects of up to $150 million where his vast knoMedge is vividly portrayed as well as smaller continuous contracts. He has served numerous pub& and private sector clients including Miartd-WOe Aviation Department, Miami Dade Park and Recreation Department, the School Board of Broward County, Baptist Hospital of Miami, Jackson Memorial Hospital and Miami -Dade Camry Public Schools where he is currently fulfilling his third professional Services Agreement for Mechanical/Electrrczl Engineering Services. Other continuous professional service agreements clients include hut not limited to MiamFDade Aviation Department, Jackson Memorial Hospital, City of Miami, Miami -Dade College, Florida Intemadowl University, Broward College and numerous other entities throughout the years. He has full comprehension and understanding of the State Requirements for Educational Facifides ISREF), Chapter 235 Fkaida Summer, Florida Building Codes and public Approvals. Mr. Aguirre was the honored recipient of the award 'Outstanding Consultant Engineer for 20Dr presented by the American Institute of Architects organization. In addition, to this award, Mr. Aguirre's designs have been recognized by other enti ills such as Hispanic Builder's Award, ULI Yam Award. Floritlz Budding of America Award and Education Design Showcase. Mr. Aguirre strives to provide LEED elements and features in his designs. REPRESENTATIVE PROJECTS • Miami Dade College, Hialeah Campus, Renovations/Remoleling- Hialeah, Florida • Miami Dade College, Wolfson Campus, Phase III, New Campus Facility - Miami, FL • Miami Clade College, Hialeah Gmpus(New Umpus) - Hialeah, Florida • Miami Dade College, Miscellaneous A/E Continuous Contract, subcomitAnins to Gunn Mamma Architecture (Inducted the Kendall Campus Biology g Chemistry lab Renovations, Budding 8000 Renovations and Promoteo Theater Exit Corridor Renovations) - Miami, FL • Milani Dade College, Miscellaneous A/E Continuous Contract, sutconsuhants to OTS (bolded Bathroom g Stairway ILerontions, Building 2" Outdoor Lighting, New Emergency Generator Installation EEC location in Liberty City and Kendall Campos Building I" Switc gear Replacement) - Miami, FL • Florida International University, Miscellaneous A/E Services (Irduded the Pharmed Arena Extensor Lighting Renovations, Student Health g Wellness Center and FIU Arena Roofing Replacement) - Miami, Florida • Broward College Master planning, campuses and center buildup -Ft. Lauderdale, Florida • University of Miami. Law library Office Renovations and Righter Library a Floor Rare Book Archive Level -Coral Gables, Fonda • Bob Graham Educational Center (K-8). 3 -story Addition - Miami, Florida • City of Miami, Stadium She Parking, Martin's new Stadium complex, A Parking Garage Structures, d Parking lot Structures and 60,000 st. recall support spies - Miami, Fonda • 396 Anambra, 15 -story Mixed Use Developmmt Towers and multi -story parking garage (LEED Goltl and Sher implementation in process)- Coral Gables, Florntla • Joseph Caleb Center, new Courthouse Annex Building and parking Garage REED Silver Rafi g in Woress) - Miami, FL • Lyon University, Athletic Budding Complex Renovations - Boca Raton, Florida • Florida International University Multi-Purpose Stadium Complex, Rh. I and 11 -Miami, FL • Design-Build, South-Dade Senior High School, School Replacement Project (State Schnol CCC -11- Homenead, Florida • Nrev, ai,%O North TemdnN Devekpnmt - Federal inspection Sever Station - oar= spore feet —Aline International Akport -Mom, Florida • New Ie8 Schools for Miami -Dade County PrrbllC Schools (schools include parking lot structure facilities serving stall, students and Wrens, LEED Principles and Concepts will followed throughout design development) - Miami, Florida o Aventura Waterways K 8 Center IState School D, K 8 Prototype) o Mandarin Lakes K 8 Naderay (State Scholl DD-1, K 8 Prototype) • Coconut Palm K -8 Academy (State School CC -1, K -8 Prototype) • Nigh Creek Elementary School Irate School E -1, New K -81 • Dr. Rolando Espinosa K 8 Center (State School P -1, New K -8) • Homestead Middle School (State School TT -I, New 8) Cba ... . ...x. LOUIS J. AGUIRRE, P.E., LEED' AP _ PRESIDENT EDUCATION Bachelor of Silence Electrical Engineering UnIversity of Miami 19(74 REGISTRATION 1968, Professional Engineer Florida, (PE 11642) 1973, fint.1 sfnP. =_I Engineer Nevada, (FE 3741) 1998, Professional Engineer Colorado, (PE 32845) AFFILIATIONS /NONORS A Member of U.S. Green Building found LEED (Leadership in Energy and _ Environmental Design) Accredited Professional 2007 AJ.A- Miami Ou._.znding Consultant Engineer Award Natboai Society of Prod sional Engineers Illuminating Engineering Society Florida Engineering Society ' American Society of Heating Refrigeration and Air Conditioning Engineers (ASHRAE) I JIm J. lfu,V= A S5X xlI S. PA. COnxulpnv 'n g'o55rs CONTINUING PROFESSIONAL SERVICES I RFO NO. 14 -07 -02 97 I Il uN � l u 6�I1100 : RESUMES LOUIS J. AGUIRRE & ASSOCIATES Mr. Sergio R. Serrano, P.E. has been a mechanical engineer since 1992 and has since acquired an Immense amount of experience in his respective discipline. He has been involved in all phases of the design and construction process. Ai an Associate /Project Manager for Lows J. Aguirre 8 Associates, PA., Mr. Serrano is responsible for client relations, management and roadwtion, site /facdhy analysis, researching and knplementing the most beneficial Meianical Design Concepts, project design, contract administration and observation of systems' installation, testing and perfoma race for major projects. Mr. Serrano has developed his design and project management skills related to educational, commercial and airport facilities. He has performed and supervised Mechanical system assessments for condition, code compliance, problem solving and upgrade. He has also performed plan reviews and prepared Design Criteria Documents. Mr. Serrano was Project Manager and Mechanical Engineer towards the $74 Million dollar parsing garage project that also provided an additional 60,000 sf of retail spaces to serve the much awaited Florida Marlins' new ballpark sodium that brought excitement to MiamirDade and Broward Counties. He 6 the Project Manager and Mechanical Engineer involvetl with the master planning and implementation to the Miami Senior High Restoration, Renovators. Rertodeeng and New Addition Project that invoked maintaining the school's historical features and bee inty while accentuating new more technically advanced characteristics to the school's surface and standards for modem use. It encompassed a 150,000 sf of new, co struction & 252,000 sf of rehabilitation while bringing the school up to codes and so lards. The scoots face IEt and rehab8iution occurred while the school remained open throughout the various phases and processes. Additionally, Mr. Serrano was the project manager Hat provided all lye Mechanical (WAC) portions of the master planning documentation and obsemtions of the various campuses and centers for Broward College. He has full comprehension and understanding of the, State Requirements for Educational Facilities ISREFI, Chapter 235 Florida Statutes, Florida Budding Codes and Public Approvals. REPRESENTATIVE PROJECTS • Miami Dade College, Hialeah Campus, Rerovatiorss /Remodeling - Hialeah, Honda • Miami Senior High School, Historical Restoration, Renovations, Remodeling and New Addition (includes a 3 -Level secured parking garage) - Miami, FL • New K -8 Schools for MiamFDade County Public Schools Isclsooh include parking lot structure facilities serving staff, students and parents, LEED Pnrlciples and Concepts will followed throughout design cievelopmentl- Miami, Florida 0 Aventura Waterways K -8 Center IState School D. K -8 Prototype) o Mandarin Ickes K -8 Academy (State Sdod DD-1, K$ Prototype) 0 Coconut Palm K 8 Academy (State School CC -1, K -8 Prototype) Arch Creek Elementary School (Sure School E -1, New K -8) • Dr. Rolando Espinosa K-B Center (State School P -1, New K -8) • Homestead Middle School (State School TT -1, New K -8) • Broward College Master Planning, campuses and center buikdings - Broward County, Fl • City of Miami, Marlin's Stadium Parking Garage, 4 Parking Garage Structures, 4 Parsing IM Structures and 60,000 sf. retail support spaces - Miartd, Florida • 396 Alhambra, 15 -stay Mixed Use Development Towers and multi -story Parking garage (FEED Gold and Sliver implementation in process) - Coral Gables, Florida • Mereac Aifres NUN Terminal Developmen t - Federal (rt Serum Station- 4�pOpsglm het -M®si Maradvul Airport - Mort* Florida • MIA Mover APM System, Fixed Facilities CMrsRuetion Services Cartwltant - Miami, Florida • Bayview Market, Retail Office Spaces and Mufti-levM Parking Gauge - Miami, Florida • YMCA Of Greater Miami, New ABapattah Family Borsch Facility (included an orvsrte parking structure) - Miami, Florida • The Ernerulia[Bridretl ffiSmry Residential N�FRbe(atldel pUling grege fac3ty)- fwtar *R • EFG Capital and S 011 Miami at 701 Brkkell Avenue Interior Reswatiors - Miami, Florida • H4Wurce Signature at 701 Brickell Avenue Interior Rerhwatiom- Miami, Florida • Interratlowl Polo Club, New Ballroom and Stadium Complex - West Patin Beach. Honda • Relief to Highland Oaks Middle School (K-mart store Conversion) - Miami, Florida • City of Miami. At alie Range Park 5wimmirg Pool Improvements - Miami, Florida • Gibraltar Private Bank & Trust o Downtown Headquarters, Office Renovations o Coral Gables Headquarters, Office Renovations 0 3'w Floor Renovations, Coral Gables Headquarters 0 4'a Floor Renovations, Coral Gables Headquarters Cb- SERGIO R. SERRANO, P.E., LEEDS AP ASSOCIATE MECHANICAL ENGINEER a�11IDGMIC+15 Bachelor of Science N.echon"coi Ersg�neervtg Ursve s:fy of Centro; Florida 1492 REGISTRATION Mechomica! Erg.:�er Herido: 57864 AFFILIATIONS /HONORS US. Green Eut''dir, Coun::if LEED (Leadersftip in Energ: and Environmental Deign) Accreciied Prole sfionol Eulding Cod=_ Corrplianc -E (BCC) Irape_ctor/Re-4E,vz ton I A."1i 10 x Xs C AIFi P cocsdw �sEngrnee!s CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14 -07-02 11 CJ 4"k 99 RESUMES LOUIS J. AGUIRRE & ASSOCIATES Mr. Mario Pazos, P.E. has over 30 years of experience in the electrical engineering profession, inclusive of electrical design and construction phase inspection for industrial, commercial, educat'vul and residential facilities in Cuba and South Florida. He has particular expertise in the design of power lighting, fire alarms, grounding, lightning and other electrical systems. He has worked oo individual projects and consulting contracts bwolviog new construction, additions and improvements to different types of facitiues. Mr. Farm is familiar with lag applicable codes and regulations. As Associate /Project Manager for Louis I. Aguirre & Associates, PA, Mr. Pazos is responsible for client relations, management and coordination, site/faodity analysis, researching and implementing the most beneficial Electrical Design Concepts, project design, contract administration and observation of systems' installation, testing and performance for major projects. He has performed and supervised Electrical system evaLations for condition, code compliance, problem solving and upgrade. He has also performed pan reviews and prepared Design Criteria Documents. Mr. Paros is the head Electrical Engineer involved in the re -design of the construction documents towards the 396 Alhambra building a 15 -story mixed -use terant/reta8 facility situated along Alhambra Circle in Coral Gables containing two towers. Both Lowers were developed to ascertain LIED certification. The North tower is pre- qua8ipd GOLD and the south tower was processed to ascertain Silver rating. Adi iddrally, Mr. Pazos has worked in the capacity of project manager for many of our continuing miscellaneous contracts for both Miami Dade College, City of Miami and many other clients. He has full ommmehension and understanding of the State Requirements for Educational Facilities (SREF), Chapter 235 Florida Statutes, Florida Building Codes and Public Approvals. He was the electrical engineer who has designed many of the renovations as of ate serving many of the Miami -Dade College campuses. REPRESENTATIVE PROJECTS • Miami Dade College, Miscellaneous A/E Continuous Contract, sub-consultants to Gum Matufe Architecture (Included the Kendall Campus Biology & Chemistry Lab Renovations, Building 8000 Renovations and Promoted Theater Exit Corridor Renovations) - Miami. FL • Miami Dade College, Miscellaneous A/E Continuous Contract, sub- consuhans to OTS (Included Bathroom & Stairway Renovations, Bulldog 3000 Outdoor Ughting, New Emergency Generator Insulation EEC location in Liberty City and Kendall Campus Building 100D Switdhgear Replacement) - Miami, FL • Florida Intematiowl University, Miscellaneous A/E Services (Inducted the Pharmed Arena Erterior Lighting Renovations, Student Health IS Wellress Center and FN Arena Rooluhg Replacement)-Mann, Florida • City of Miami, Martin's Stadium Parking Garage, 4 Parking Garage Structures, 4 Parking Lot Structures and 60,000 sf. retail support spaces -Miami, Florida • 3% Alhambra, IS -story Mixed -Use Development Towers and muhLstdry parking garage (LEEO Gold and Silver implementation in process) - Coral Wales, Honda • Gty of Miami, Fire Station No. s 13 (LIED Coni ication in process) -Mami, FL • MIA Mower APM System, Fuld Facilities Construction Services Consultant - Mami, Florida • City of Mami, Sergeant Joseph Delanry, Naranja and Gourds Parks Ao is Center Renovations - Miami, Florida • YMCA of Greater Miami, New Allapattah Family Branch Fades (inctWed an on -she parking structure) - Mami, Florida • Norwegian Cruise Lines, Buildings 10 & it Headquarters, Cafe and Conference Center Remvaddns - Miami, Florida • Kaboo Kaboo Office Suite renovations at 396 Alhambra - Coral Gables, FL • Miami Kilian Senior High School, 3 -Story, Addition - Miami, Florida • Southwest Miami Senior High School, 3 -Story Addition - Mami, Floricla • MDCPS, Relief t0 Highland Oaks Middle School (K -mart Store Conversion) - Mami, Florida • Coconut Palm K -8 Academy (Suite School CC -1, New Greedousel - Mami, Florida • Redlands Middle Shod, New Greenhouse - Miami, Florida • New K -8 Schools for MizmFDade County PubBC Schools (scthools include parking lot structure fadifies serving staff, students and parents, LIED Principles and Concepts will followed throughout design development) - Miami, Florida o Aventura Wateways K -8 Center (State School D. K-8 Prototype) o Mandarin Lakes K -8 Academy (State Shod DD-1, Kb Prototypel • Coconut Palm K -8 Academy (Sate School CC -1, K -8 Prototype) • Arch Creek Elemenury School SSate School E -1, New K -8) o Dr. Rolando Espinosa K -8 Center (State School P -1, New K -8) o Homestead Middle Schdol(Sure School TT -),New K -8) MARIO PAZOS, P.E., LEED AP - ASSOCIATE ELECTRICAL ENGINEER EDUCATION eachi of Science Efec:rial Erhgircering University of Havana, Cuba 19,14 REGISTRATION Pmfes<fonal Engineer Florida, PE 557076 AFFILIATIONS /HONORS U_c. Green BuRdbg Council LED (leadership in Energy and Envlmnmental Design) Attre:'ited Professional 6utldi o Code Compliance (6CC) Inspector /Reviewer LCX 1. AGURP_ 6 ^SOC1A1E5. P_h. COnSV lump ,n n;nners CONTINUING PROFESSIONAL SERVICES I RFQ NO. I4 -07 -02 99 E STAFFING RESUMES LOUIS J. AGUIRRE & ASSOCIATES Mr. Sarea has several years of eapenence in the Design of all phases of Mechanical Engineering Wt include WAC, Plumbing and Fire Protection Design and Dakuhtios. He is proficient in all aspects of computer applications for Mechanical Design, including AutoUD Revh and a woe range of amprter graphic design programs. He has worked o a woe range of ver tde project Types that 'vmclude facilities such as municipality, educational, military, governmental, cc ovrmerclal, healthcare and residential. Due to his van involvement and expeneme in Ne many phases of the development To educational fadlhes and having worked on countless separate school facility projects, many of those projects have'ruJuded but have not been limited o designing new buildings, Remodeling and /or Renovators, Root Repair or Re-roofing, Ufe Safety, Cost Estimates, system research, code research, spenfiatiom, shop drawing review, fire safety and provisions for ADA and the handicapped law requirements. Mr. Suarez was head plumbing/fire protection involved in the design and arstnotion towards the parking garages and structural lots that will also included an additional ED," sf of retail spaces for the much awaited Madim Baseball Stadium, a $74 Milbon dollar projM that brought exatement for MiamiDade, Broward and Monroe Counties. AdditioralN, Mr. Suarez provided the Mechanical (Plumbing and F /P) observations and documentation for the master planning of each campus and center for Broward College. He has gained full comprehension and understanding of the State requirements for Educational Facilities (SREF), Chapter 235 Fonda Statutes, Fonda Building Codes and Pudic Approvals. REPRESEHTAnVE PROJECTS Miami Dade College, Hialeah Campus, Renovations/Remodeling- Hialeah, Florida Miami Semor High School, Historical Restoration, Renovations, Remodeling and New Addition (includes a 34eve4 seared parking garage) - Miami, Florida &inward College Master Planning, campuses and center buddogs - Bro yard Couny, Fl- Lynn University, Athletic Building Complex - Bova Rnon, Florida MDCP5, Relief W Highland Oaks Middle School (K -mart Store Conversion) - Miami, Hvida New K -8 Schools for Miami Dade County Public Schools (schools include parking lot structure facilities serving staff, students and parents, LEED Principles and Concepts will followed throughout design development) - Miami, Florida o Aventura Waterways K -8 Center (State School D, (A Prototype) o Mandarin Lakes K -8 Academy )State Sclnol DD-1, K -8 Prototype) • Coconut Palm K -8 Academy (State School CC -1, K -8 Prototype) • Arch Creek Elementary School (State School E -1, New K -8) • Dr. Robndo Espinosa K -8 Center (Sate School P -1, New K -8) • Homestead Middle School )Sate School TT -1, New K -8) • American N6hes Notl, Teoraal OeeloPnvrt - Federal kupetDon Services Station - 4 ,000 spore feet -Mbm kcmutimal Awpon - Miami, Fonda • MIA DATI -n g Fbrtsgo Parking Garage Reps - Mbmi, Florida • MIA MOVer APM System, Rxed Faditim Construction Services Consultant - Miami, Florida • Our of Miami, Martini Stadium Parking Garage, 4 Parking Garage Structures, 4 Parking tot Structures and 60,000 sf. retail support spares - Miami, Florida • Joseph Caleb Center, new Courthouse Annex Building and Parking Garage (LEED Silver Rating To process) - Miami, Flonda • 396 Alhambra, 15 -story Mved -Use Development Towers and multistory parking garage (LEED Goo and SRser unplemenation in process) - Coral Gables, Florida • City of Miami, Fire Station No. a 13(LEED Cenifcation in process) - Miami, Florida • City of Miami, Athale Range Park 5wimming Pod Improvements - Miami, Florida • Ctry of Miami, Sargeant Joseph Delamy, Naranja and Goulds Parks Aquatic Center Renovations - Miami, Florida • Jackson South Communky Hospital, Renovations and Expmion- Miami, Florida • Miami Jewish Hone and Hospital for the Aged, Harry Omemin Building 2°a Floor LTCH Interior R¢mgVations - Miami, Florida • Kabco Kabou Office Suite renovations at 396 Alhambra -Coral Gables, Fonda • Hdrforce Signature at 701 Brkkell Avenue lmeror Renovations - Miami, Florida • Lincoln East Garage Re- moddicatons - Miami, Florida • Lincoln Park Toilet Modifications - Miami, Florida • EFG Capital at 701 Brickell Avenue Interior Reouva[ians- Miami, Florida • Bar Invest Suite 2040 at 701 Brkkell Interior Renovations - Mbmi, Florida • Jones Lang USa Be Common Conference Center at 701 Brkkell, Sure 110- Miami, Florida • 701 Brkkell, 30th Floor ADA Toilet Renovations - Miami, Florida ,EDUARDO A. SUAREZ, -P.E., LEEDO AP' MECHANICAL ENGINEER EDUCATION Bachelor of Science Mechori cal Erhgineenng Urver4ty of Miami 20D1 REGISTRATION Prolei<ionc: Eng`ne tr Florida, PE ;;6-1759 _ AFFILIATIONS /HONORS US. Green BT4ding _Council LEED (Leadersripin Energy and Enwoorretal Des'gnl Accreaded Profe� ',onol ArthericonSocSely of Healirg,- P.eit geration ozra.Ar Ccndiordng Ergineen (ASFIRAE) . American Son, ely of Pant-Urg E-Q neer, fA,;PE). &rkd�na Code Comppicl -e (BCC) Inspector/Reviewer IrJux; J. ACJ9Fe %A Ai$aClalFi Pix_ - cpnsmsm0 a :0tn =_ens CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14 -07 -02 Inc W Mr. Freedman is an experienced environmental professional serving public ® and private clients throughout the Stale of Florida. He specializes in ® environmental review of transportation related projects through all phases of the project (planning, design, permitting, construction and post-construction ® monitoring). Mr. Freedman has conducted National Pollutant Discharge ® Elimination System (NPDES) and permit compliance inspections of Florida ® Department of Transportation (FDOT) assets, and mitigation and maintenance monitoring for dozens of FOOT constructed sites. He has assisted with the ® permitting of numerous FOOT projects and has written more than 70 National ® Environmental Policy Ad (NEPA) memos for minor transportation projects and ® technical documents for Project Development and Environment (PD &E) Studies and Reevaluations. Freedman is also an advanced diver with ® extensive experience conducting benthic resource surveys. Mr. Freedman also specializes in municipal consulting and has provided plan review, landscape inspection, environmental assessments, expert witness, Permitting, ordinance development, street tree inventory, canopy assessments, carbon sequestration analysis and wildlife permitting services to municipalities throughout south Florida. He has also conducted numerous studies related to dimate change and sea level rise and was involved with the preparation of the Broward County Climate Change Action Plan. STAFFING RESUMES E SCIENCES Justin Freedman, MS Senior Scientist Education. M.S., Marine Biology, Nova Southeastern University Oceanographic Center BA., Biology, Tufts University Professional Licenses 1 Certifications Certified Arbodst, FL 5488A Tree Risk Assessment Qualification (ISA) FDEP Certified Erosion and Sediment Control Inspector.and Instructor Certified Manatee Observer PADI Advanced Open Water, Enriched Air Certified Diver Certified Landscape Inspector Certified Green Industries Best Management Practices Instructor* Certified in Advanced Maintenance of Traffic Years of Experience 12 ® Project Experience C ty of Key West City Hall Arborisl Assessment — The City of Key West is relocating its City Hall facilities to the site of the ® former Glynn Archer Elementary School at 1300 White Street. In support of landscape and architectural design efforts, Mr. ® Freedman conducted an assessment of the approximately 65 trees at the site. The purpose was to assess the health and condition ® of the trees at the site, and to provide recommendations for preservation, transplantation and/or removal and replacement associated with the new design and in accordance with the City's municipal code. to Tamiami Canal Historic Swing Bridge Replacement Reevaluation, FDOT District Six, Miami -Dade County, Florida — The existing swing bridge was originally constructed as the Miami Rivers 27th Ave. River crossing in 1921, and subsequently relocated to its current Tamiami Canal location in 1941. The bridge is one of three bob - tailed swing spans in Florida and is one of the oldest bddges on the Miami River. The bridge is structurally deficient and functionally obsolete, and will not be able to accommodate future high traffic demands. Mr. Freedman reevaluated the EA/FONSI for a historic bridge replacement project in MiamFDade Canty. Work included coordination with the three agencies with overlapping jurisdiction over the project – FDOT, Miami -Dade Canty and City of Miami, as well as numerous consultants. Florida Keys Bridge Inspections, FDOT District Six, Monroe County, Florida — This project involved SCUBA diving and inspecting bridge construction projects for debris. Mr. Freedman assessed three bridges, documenting fallen debris, and provided recommendations for its removal. Dune Enhancement and lighting Design and Permitting, City of Dania Beach, Broward County, Florida — For this project, Mr. Freedman designed and permitted enhancements to dunes along Dania Beach's signature beach. This project was initiated due to public safety concems and became controversial as the project included the removal of a stand of seagrape trees. Mr. Freedman worked Closely with FDEP permitting agency staff and sea turtle experts from the FWC, and coordinated with a number of environmental advocacy groups that initially voiced opposition for the project. Through meetings and presentations, Mr. Freedman demonstrated the environmental and public safety value of the project and received consensus among the stakeholders. Work for this project induced reviewing and making recommendations to make lighting at the beach more sea turtle friendly, designing lighting shields, designing dune landscaping, preparing a sea turtle protection ordinance, construction oversight and post-oonsWction monitoring. Cba ..,....,... . CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14 -07 -02 101 ENGINEERING !9. SCleAces ENVIRONMENTAL ECOLOGICAL W Mr. Freedman is an experienced environmental professional serving public ® and private clients throughout the Stale of Florida. He specializes in ® environmental review of transportation related projects through all phases of the project (planning, design, permitting, construction and post-construction ® monitoring). Mr. Freedman has conducted National Pollutant Discharge ® Elimination System (NPDES) and permit compliance inspections of Florida ® Department of Transportation (FDOT) assets, and mitigation and maintenance monitoring for dozens of FOOT constructed sites. He has assisted with the ® permitting of numerous FOOT projects and has written more than 70 National ® Environmental Policy Ad (NEPA) memos for minor transportation projects and ® technical documents for Project Development and Environment (PD &E) Studies and Reevaluations. Freedman is also an advanced diver with ® extensive experience conducting benthic resource surveys. Mr. Freedman also specializes in municipal consulting and has provided plan review, landscape inspection, environmental assessments, expert witness, Permitting, ordinance development, street tree inventory, canopy assessments, carbon sequestration analysis and wildlife permitting services to municipalities throughout south Florida. He has also conducted numerous studies related to dimate change and sea level rise and was involved with the preparation of the Broward County Climate Change Action Plan. STAFFING RESUMES E SCIENCES Justin Freedman, MS Senior Scientist Education. M.S., Marine Biology, Nova Southeastern University Oceanographic Center BA., Biology, Tufts University Professional Licenses 1 Certifications Certified Arbodst, FL 5488A Tree Risk Assessment Qualification (ISA) FDEP Certified Erosion and Sediment Control Inspector.and Instructor Certified Manatee Observer PADI Advanced Open Water, Enriched Air Certified Diver Certified Landscape Inspector Certified Green Industries Best Management Practices Instructor* Certified in Advanced Maintenance of Traffic Years of Experience 12 ® Project Experience C ty of Key West City Hall Arborisl Assessment — The City of Key West is relocating its City Hall facilities to the site of the ® former Glynn Archer Elementary School at 1300 White Street. In support of landscape and architectural design efforts, Mr. ® Freedman conducted an assessment of the approximately 65 trees at the site. The purpose was to assess the health and condition ® of the trees at the site, and to provide recommendations for preservation, transplantation and/or removal and replacement associated with the new design and in accordance with the City's municipal code. to Tamiami Canal Historic Swing Bridge Replacement Reevaluation, FDOT District Six, Miami -Dade County, Florida — The existing swing bridge was originally constructed as the Miami Rivers 27th Ave. River crossing in 1921, and subsequently relocated to its current Tamiami Canal location in 1941. The bridge is one of three bob - tailed swing spans in Florida and is one of the oldest bddges on the Miami River. The bridge is structurally deficient and functionally obsolete, and will not be able to accommodate future high traffic demands. Mr. Freedman reevaluated the EA/FONSI for a historic bridge replacement project in MiamFDade Canty. Work included coordination with the three agencies with overlapping jurisdiction over the project – FDOT, Miami -Dade Canty and City of Miami, as well as numerous consultants. Florida Keys Bridge Inspections, FDOT District Six, Monroe County, Florida — This project involved SCUBA diving and inspecting bridge construction projects for debris. Mr. Freedman assessed three bridges, documenting fallen debris, and provided recommendations for its removal. Dune Enhancement and lighting Design and Permitting, City of Dania Beach, Broward County, Florida — For this project, Mr. Freedman designed and permitted enhancements to dunes along Dania Beach's signature beach. This project was initiated due to public safety concems and became controversial as the project included the removal of a stand of seagrape trees. Mr. Freedman worked Closely with FDEP permitting agency staff and sea turtle experts from the FWC, and coordinated with a number of environmental advocacy groups that initially voiced opposition for the project. Through meetings and presentations, Mr. Freedman demonstrated the environmental and public safety value of the project and received consensus among the stakeholders. Work for this project induced reviewing and making recommendations to make lighting at the beach more sea turtle friendly, designing lighting shields, designing dune landscaping, preparing a sea turtle protection ordinance, construction oversight and post-oonsWction monitoring. Cba ..,....,... . CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14 -07 -02 101 O STAFFING RESUMES E SCIENCES Justin Freedman, MS Page 2 Sea Turtle Protection, Lighting Analysis, City of Dania Beach, Broward County, Florida — For this project, Mr. Freedman assessed beachfront lighting for general condition and sea turtle friendliness (compliance with Section 62B -55, FAC) and provided recommendations to the City to bung fighting into compliance. Grandview Palace Marina Permitting Support, Glasgow Equipment, North Bay Village, Miami -Dade County, Florida - Glasgow equipment contacted Mr. Freedman to assist with a contentious permitting issue through the FDEP. He provided technical support, resulting in permit issuance. Benthic Resources Survey and Permitting for Conduit Under Bear Cut, Miami -Dade County, Florida — Mr. Freedman provided environmental assessment and permitting support for the installation of approximately 2,550 linear feet of conduit located along the ocean side of the Bear Cut Bridge of the Rickenbadker Causeway in Miami -Dade County, Florida. E Sciences conducted a wetland delineation, seagress survey, benthic habitat survey and delineated extents of mangroves within the project area. E Sciences subsequently worked with the design engineers to develop construction methodologies to minimize resource impacts and thereby minimize permitting requirements. Due to dose coordination with agency regulators and design engineers, the project will qualify for a Standard General Environmental Resources Permit from the FDEP. Additionally since the project will avoid impacts to mangroves Miami -Dade County authorization will not be required for the project, saving valuable time and money for the project. Canopy Analysis, City of Miami Beach, Miami -Dade County, Florida — Mr. Freedman served as the project manager for this canopy analysis project for the City of Miami Beach, which was conducted under E Sdeinces' General Environmental Engineering Services contract for the City. Using i -Tree Canopy, Mr. Freedman and his team estimated the canopy coverage for the City's urban forest, as well as percentage of available space remaining within the City for additional tree planting. Mr. Freedman developed a one -page brochure for public education documenting the information from the study. General In -mouse Environmental Services, FOOT District Four, Florida — Mr. Freedman served three days a week as in- house environmental specialist in the FOOT District Four Planning and Environmental Management (PL &EM) Office. Work induded performing environmental phase reviews and preparing and reviewing NEPA documentation for over 70 roadway and bridge projects including field identification of fisted species habitat, wetlands, historic resources, Section 4(f) and contaminated sites. Environmental Review I NEPA Documentation for SR A1A, Hallandale Beach, Broward County, Florida — Mr. Freedman provided environmental review and NEPA recommendations for DAP project along SR A1A. Concerns included sea lurtle{riendly lighting. Monroe County Pedestrian Path, Monroe County, Florida — Mr. Freedman provided permitting support services to Monroe County for a pedestrian path in Key Largo. This project included the design and pemmitdng for the path, which man adjacent to areas of tropical hardwood hammock, and a pedestrian bridge over Marvin D. Adam's Waterway. During the design phase for this project, Mr. Freedman mapped trees along the corridor and worked with designers to avoid impacting valuable bees, including trees constihrting natural areas adjacent to the roadway and individual landscape trees that were likely to provide shade for pedestrians. Where possible, Mr. Freedman provided notes to instruct where roots and limbs could be trimmed back to provide access. He also conducted a benthic resources survey within the proposed bridge footprint over the Marvin D. Adam's Waterway. Using SCUBA and a team of divers and structural engineers, Mr. Freedman documented resources for use in acquiring project permits. Vizcaya Museum and Gardens, City of Miami, Miami -Dade County, Florida — This project involved a multi-disciplinary landscape architecture and environmental restoration plan for the waterways and tidal pool within the museum's property, which balanced ecological function with creative landscape aesthetics, recreational functions and values, and improvements to water quality, and planting designs based on historic from inventories, including mangroves, native hardwood hammock and coastal scrub species. Mr. Freedman served as the project manager for the construction administration portion of this project, including evaluating contractor qualifications and conducting compliance inspections. CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14 -07 -02 102 .1�, ENGINEERING a I ienaes ENVIRONMENTAL ECOLOGICAL Ms. Locke has been providing professional environmental and engineering consulting services for over 26 years. During her career, she has worked in many facets of environmental consulting including environmental audits, assessment and remediation, stormwater design, sanitary sewer planning, environmental permitting, climate change impact evaluation, grant assistance, mitigation design, Brownfields, community involvement, and training. Ms. Locke has provided litigation support for the FOOT, Miami -Dade Aviation Department and private entities. She also serves as E Sciences' Corporate Quality Assurance Officer. Ms. Locke previously managed an environmental department for a large engineering firm in Miami -Dade County for over six years. She is a former President of the South Florida Association of Environmental Professionals and served as a commission-appointee to the Broward County Brownfields Redevelopment Task Force and the City of Fort Lauderdale Community Advisory Board. Ms. Locke is a Board Member for the Smart Gmwth Partnership and is their liaison to the Broward County Metropolitan Planning Organization. She is also the Current President -Elect for the Florida Brownfields Association and is served as Co Chair for the FBA's 16" annual Conference in 2013. STAFFING RESUMES E SCIENCES Nadia G. Locke, P.E. Associate / Senior Engineer Education B.S. Materials Science and Engineering, University of Florida, 1988 Professional Licenses! Certifications Professional Engineer: FL -58676 LEED Green Associate Certified FDEPStormwater, Erosion and Sedimentation Control Inspector and Instructor. - OSHA 40 Hour HAZWOPER / 8 Hour Site Supervisor - - NAUUPADI Advanced Open Water Diver Years of Experience 26 Project Experience General Environmental Engineering Services, City of North Miami Beach, Miami -Dade County, Florida — Ms. Locke provides ongoing environmental support to the City of North Miami Beach under E Sciences' general environmental engineering services contract. She was the engineer of record for the City's largest environmental cleanup project, Taylor Park, and has conducted several Phase I ESAs for the City. Ms. Locke held community meetings and has presented at CRA and City Council meetings. Taylor Park, City of North Miami Beach, Miami -Dade County, Florida — Taylor Park has been slated for redevelopment since 1999, when the FDEP had their Brownfields contractor conduct a Brownfields Assessment of the site. The assessment revealed metals and petroleum in the soil and metals in the groundwater. In 2005, assessment activities revealed the presence of buried solid waste on most of the 21.8 -acre property. Since that time, environmental issues have continued to restrict and complicate redevelopment efforts for the property. The property is currently occupied by an inactive ball field, an operating daycare facility, vacant land and a lake. Ms. Locke was the engineer of record and project manager for the assessment and conceptual remediation design for the property. The remediation planning was closely coordinated with the community desires, the City's needs and the park master planners to ensure a solution to remedy the environmental issues in conjunction with all of the stakeholder needs. She represented the City in two meetings with residents and other public meetings. Greynolds Park Renovations, Preliminary Evaluation Report, North Miami Beach, Miami -Dade County, Florida — This park is currently owned by Miami -Dade County and is used as a recreational park housing a variety of amenities, including a man -made lagoon and bird rookery. The intended hydrologic function of the park was based on historic tidal influences; however restricted flows to the rookery and lagoon have resulted in a degraded lagoon and substantially reduced bird population. This project was developed to identify issues that must be addressed to return the ecosystem to a more naturally productive state and improve the beneficial use of the park by enhancing and restoring the diminished hydrologic and biological function of the rookery. Ms. Locke provided the evaluation of the hydrologic function of the system and provided overall technical review of the reports prepared. General Environmental Engineering Services, City of Miami Beach, Miami -Dade County, Florida — Ms. Locke provides ongoing services to the Support the City of Miami Beach under E Sciences' general environmental engineering contract. Under this contract, Ms. Locke is currently conducting a citywide sea level rise evaluation. She was also the engineer of record for Spill Prevention Control and Countermeasure Plans (SPCCs) for twelve facilities throughout Miami Beach, and for engineering CONTINUING PROFESSIONAL SERVICES I REG NO. 14 -07 -02 103 STAFFING RESUMES E SCIENCES Nadia G. Locke, P.E. Page 2 0 controls being negotiated with Miami -Dade County for regulatory closure of a solid waste facility. Facilities included pump stations, fire stations, public works yard, Miami Beach Golf Club and the Convention Center. 6 ® Continuing Contract for General Environmental Engineering Services, City of Fort Lauderdale, Broward County, Florida — Ms. Locke is the contract manager for this continuing services contract for general environmental engineering consulting services for the City of Fort Lauderdale. Services conducted to date include emergency response during construction of a fire 0 station; Phase I and Phase II ESAs / opinion of post landfill closure costs; endangered species surveys; burrowing owl permitting ® and relocation; benthic (seagrass) surveys; and indoor air quality I asbestos surveys. Some services have been provided to assist in ensuring environmental compliance for LAP projects. Sistrunk Boulevard Streetscape and Enhancement, City of Fort Lauderdale, Broward County, Florida — Originally slated as a stimulus project where funds were being disbursed through FOOT District Four, Ms. Locke conducted a Level 2 assessment of a 1.25-mile corridor streetscepe enhancement project located in the heart of the City of Fort Lauderdale CRA. Testing included Maintenance of Traffic, private utility location and collection of 36 soil and groundwater samples for laboratory analysis. Data was compiled and reported, and environmental notestbid specification language was developed for bidding purposes. Ms. Locke also engaged the CRA in avoidance and minimization considerations and assisted the CRA with managing risks associated with environmental issues during concoction. ® Pre- Demolition Asbestos Surveys for Low Level Bridges, City of Fort Lauderdale — Ms. Locke was the project manager for asbestos surveys on three bridges in Fort Lauderdale. The survey scope and reports were coordinated with FOOT District 0 Four POEM Department stag in order to satisfy FOOT requirements and project needs, as FOOT was providing funding for the 0 demolition and reconstruction of these bridges. Pompano Beach Community Redevelopment Agency Continuing Contract for Environmental Engineering Services, ® City of Pompano Beach, Broward County, Florida — Ms. Locke is the contract manager for E Sciences' continuing services contract with the Pompano Beach CRA. Through this contract, E Sciences conducted Phase I and 11 Environmental Site Assessments for several parcels in preparation for the CRA's redevelopment planning. Ms. Locke is working with the CRA to ® consider options on how to safely manage construction on a solid waste disposal site and is preparing environmental 0 documentation to satisfy NEPA on a LAP project. 0 Environmental Review and Permitting for LAP Project for NW 36" Avenue Pedestrian Enhancement Project, Pompano ® Beach, Florida — Ms. Locke is the project manager for conducting an environmental screening memo and environmental ® permitting for the this FOOT- funded bicycle and pedestrian enhancement project. As part of the review, E Sciences is preparing the environmental notes to be included in the constructability. 0 Environmental Review for LAP Project for Martin Luther King, Jr. Avenue, Pompano Beach, Florida — Ms. Locke is the project manager for conducting an environmental screening memo for the this FDOT- funded roadway improvement project for the City of Pompano Beach. This project is part of a roadway improvement for a condor that extends beyond the City's 0 boundaries and is known as the Education Corridor. As part of the review, E Sciences prepared the environmental notes to be B included in the constructalnlity plans. River Oaks Preserve Stormwater Park, City of Fort Lauderdale, Broward County, Florida — The purpose of the project is to create a passive stormwater park with wetland features to relieve flooding in the River Oaks neighborhood and provide recreational use for local residents. Ms. Locke provided engineering support for the wetland delineation and tree survey, master ® site planning, and permitting for this stormwater park. She also assisted with the development of a summary of funding and grant ® opportunities for the project. The park will be preserving and enhancing enlisting forested wetlands on site and restoring _ herbaceous wetlands to a stormwater pondtfilter marsh community that will alleviate flooding in the River Oaks neighborhood. 3ba . CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14 -07 -02 104 e O 0 LD 0 0 STAFFING RESUMES E SCIENCES -� ENGINEERING �Seienees '.v ....AL Patricia L. Gertenbach, P.G. ECOLOGICAL Senior Associate Ms. Gertenbach has over 22 years of environmental consulting experience, inciudkg 17 years in South Florida. She opened the E Sciences Fort Education Lauderdale office in April 2002, and presently is a Senior Associate providing B.S., Geology, West Georgia College, 1991, contract management, QA/OC and technical leadership on a variety of projects Magna Cum Laude and contracts. She has managed and/or provided technical support on large contracts with multiple task orders for a number of public clients including the Professional Licenses I Certifications FDOT, FDEP, Broward County, SFWMD, Miami -Dade County, Monroe County, Professional Geologist: FL -2037, GA -1444 numerous municipalities in South Florida, U.S. Department of Defense (Army LEED Green Associate and Air Force), National Park Service and FWS in Florida, Georgia, Kansas, PADI – Advanced Open Water Diver Ohio, Virginia, Puerto Rico and New York. Her experience in the private sector FWC Certified Manatee Observer includes industrial and commercial facilities, mining operations, developers, and Hydric Soils Workshop law finis. Through these projects she has gained experience in agency SFWMD UMAM Workshop coordination; public meetings; contamination assessments (Phase I and 11) and USACE Wetlands Delineation and remediabon that consider both ecological and human health risks in a variety of - media for a variety of constituents; regulatory compliance; principal author Management Training and/or reviewer for NEPA and FOOT PD &E Studies and associated OSHA 40 Hour HAZWOPER/8 Hour Site documents; extensive monitoring, sampling, disposal and documentation of Supervisor contaminated and/or hazardous substances; extensive interpretation, Certified FDEP Stonmvater, Erosion and communication and recommendations to staff and clients of assessment Sedimentation Control Inspector and results; installation, development and sampling of hundreds of groundwater Instructor monitoring wells and piezometers; NPDES pern t implementation; GIS; aquifer analyses; water quality studies; environmental impact reviewstphase reviews; Years of Experience 22 preparation, review, and/or QA/QC of numerous ecological, environmental and water quality documents; Underground Storage Tank7Aboveground Storage Tank rertmovalfinstalletion oversight and report preparation; geotechnical investigations; database development; geologic assessments; and geophysical surveys. Ms. Gertenbach uses this broad background and her project management skills to provide quality driven, technically sound solutions that meet the client's needs in an efficient and cost effective manner. Project Experience Miscellaneous Permitting, FOOT District Six, Florida — As project manager, Ms. Gertenbach provided permit support for various projects and permits including DERM Class I and Class IV permits, ERPs, benthlo surveys, manatee observations, wetland delineations, preliminary wetlands and environmental assessment of potential greenways, and development of a permit tracking system and a training CD-ROM for teaching scientists how to read road construction plans. General Environmental Coordination & Support for Florida Keys Overseas Heritage Trail, Monroe County, Florida — As project manager, Ms. Gertenbach provided environmental coordination and technical support to FDEP for permits, mitigation, and coordination with SFWMD, FOOT and local municipalities involved with the construction of the 106 -rile pedestrian-bicycle path to be completed from Key Largo to Key West utifmng 23 of the historic Flagler Railroad Bridges. Coorclinatiam included providing NEPA documentation to FOOT for each for each segment. Indian Key FlII Bike Trail, Islamorada, Florida — As project manager for this project, Ms. Gertenbach provided management and fedmnical support for a Stormwater Demonstration Projedlbicyde path upgrade for Islamorada. Services included construction ergheering inspections and assistance with negations with SFWMD. She collaborated with FDOT and SFWMD to obtain permit modification for charges in design mid - stream that warranted change from Noticed General to Standard General Permit; developed a fast -track mitigation plan for contractor to minimize impacts to adjacent wetlands; assisted the municipality with implementation of the mitigation plan and with fines negotiations with SFWMD; performed biological assessments; and submitted the final turbidity monitoring report. Canal Assessment Report, Islamorada, Florida — As project manager, Ms. Gertenbach waked closely with the Village of Islands, Islamorada public works department to identify canal(s) for water quality improvement projects by reviewing available data to evaluate the best candidate canals based on need and a cost - benefit analysis. The review included summarizing water quality data that had been collected as part of Islamorada's monitoring program, analyzing data for trends, and examining possible treatment technologies. She collaborated with state and local agencies to identify permit requirements for water quality improvement treatment technologies. As part of this project, Ms. Gertenbach presented findings to the Islamorada Village Council, and CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14 -07 -02 105 STAFFING RESUMES E SCIENCES Patricia L. Gertenbach, P.G. Pace 2 participated in a presentation to local high school science students demonstrating how their volunteer efforts collecting water quality samples were used by the municipality to help with public works projects. Key West City Electric System (CES), Transmission System Construction Oversight, Lower Keys, Florida — Ms. Gertenbach provided permit compliance monitoring, project management and technical support to CES during construction of an electrical transmission system that traversed wetlands, mangrove fringe and seagress beds in the Lower Keys. Tasks included collaboration with USACE and FDEP; construction oversight and documentation that included monitoring of wetland impact areas prior to, during, and following construction: working with construction crews to reduce wetland impacts at construction and staging areas; ensuring all permit conditions were met; identifying exotic vegetation for maintenance cmws; and producing monitoring reports for FDEP. No violations occurred though the project entailed extensive construction in sensitive communities. Post- construction recovery was accepted by FDEP in the three -year negotiated time frame. • Monroe County Residential Canal Inventory and Assessment, Monroe County, Florida — Developed comprehensive GIS ® database of residential canals in Monroe County and used database to categorize canals by parameters such as size, depth, configuration, distance from open water, orientation, and lard use. Collected data from, and collaborated with, numerous agencies, B municipalities, homeowners and other stakeholders in the Keys. Used the categodzafim to recommend various treatment ® technologies. Performed a case study on he effectiveness of various treatment technologies employed in one community to address 0 water quality issues over a period of approximately 20 years. The GIS database is used by numerous agencies. Big Coppitt StormwatarlXeriscape Engineering Services, Monroe County, Florida – As Project Manager, Ms. Gertenbach provided Monroe Canty supplemental design for an FDOT road- widening project on Big Coppilt Key that was going to impact an existing bike path. Monroe Canty wanted to use the opportunity to cored design flaws in the path that had become apparent over the years. However, due to budget constraints, FDOT was not able to design the path with the upgrades that the Canty identified, such as reducing the width of the path and incorporating meanders. The E Sciences Team coordinated with the FOOT design engineers throughout the design process, revising the bike path and landscaping as changes were made to the slormwater swales. Monroe Countys desired upgrades were successfully incorporated into the plans, and were included in the final construction. • 0 Altemative Lighting Design Standards for Roadways in Coastal Areas, South Florida — As project manager, Ms. Gertenbach waked closely with FOOT District Four personnel, lighting engineers and regulatory agencies to develop alterative fighting design standards for roadways in coastal areas adjacent to sea turtle nesting beaches. Development of standards will provide fighting engineers aftemative designs that can be used to reduce or eliminate fight that would otherwise trespass onto beadles, and possibly disrupt sea turtles' nesting activities. The standards will also li kety help architects and engineers waking on a variety of projects in other ecologically sensitive areas become aware of the altemative fighting designs available. Work on this project has lead to a number of related projects including: retrofitting fights along SR A1A in Broward County with sea turtle friendly tights andfor shields; design and'ahsWWtion of signs along and leading to SR AtA in Broward Canty informing public of reduced fighting during sea turtle nesting season; and participation in a number of community activities educe* the pudic abort sea turtles, the effect fighting can have on their nesting activities, and successful alternative lighting projects implemented by FDOT (ex: SR A1A in Box Raton). CONTINUING PROFESSIONAL SERVICES I RFQ NO. I4 -07 -02 106 Vizcaya Gardens, City of Miami, Miami-Dade County, Florida — Ms. Gertenbach provided quality assurance on this restoration project at the prestigious Vizcaya Gardens. E Sciences' team of landscape architects, engineers and scientists worked together to 0 develop restoration plans for two areas in the gardens: the hardwood hammock and the south canal restoration. The hammock had ® been damaged through the years by storms, including hurricanes, which weakened trees and allowed infestation by exotic invasive plants. E Sciences developed a comprehensive plan for removing invasive species and replanting natives that blended seamlessly O with the wellestadishe i gardens. For the south canal restoration, E Sciences prepared design plans and applied for a Class I ® Permit from Miami-Dade County Permitting, Environment and Regulatory Affairs, a permit exemption from FDEP and a Letter of Permission (LOP) from USACE to conduct maintenance dredging activities involving the removal of approximately 1,410 cubic ® yards of silt and sediments from the bottom of the canal. The objective of this project is to enhance and restore lost hydrologic ® and biological functions to the canal. E Sciences worked closely with the regulatory community to restore the canal while protecting hie mangroves that had encroached into the waterway. E Sciences also developed long -term stream - mangrove maintenance solutions. • 0 Altemative Lighting Design Standards for Roadways in Coastal Areas, South Florida — As project manager, Ms. Gertenbach waked closely with FOOT District Four personnel, lighting engineers and regulatory agencies to develop alterative fighting design standards for roadways in coastal areas adjacent to sea turtle nesting beaches. Development of standards will provide fighting engineers aftemative designs that can be used to reduce or eliminate fight that would otherwise trespass onto beadles, and possibly disrupt sea turtles' nesting activities. The standards will also li kety help architects and engineers waking on a variety of projects in other ecologically sensitive areas become aware of the altemative fighting designs available. Work on this project has lead to a number of related projects including: retrofitting fights along SR A1A in Broward County with sea turtle friendly tights andfor shields; design and'ahsWWtion of signs along and leading to SR AtA in Broward Canty informing public of reduced fighting during sea turtle nesting season; and participation in a number of community activities educe* the pudic abort sea turtles, the effect fighting can have on their nesting activities, and successful alternative lighting projects implemented by FDOT (ex: SR A1A in Box Raton). CONTINUING PROFESSIONAL SERVICES I RFQ NO. I4 -07 -02 106 0 0 0 0 e Joaquin E. Vargas, P.E. Transportation Engineer STAFFI RESUMES TRAF TECH Traf Tech ENGINEERING, INC. Education: Master of Science in Civil Engineering (Transportation Engineering) - Georgia Institute of Technology, 1987 Bachelor of Science in Civil Engineering - Santo Domingo Institute of Technology (INTEC), 1986 Registration: Professional Engineer - Florida (PE# 44174), 1991 Professional Traffic Operations Engineer (PTOE# 1262), 2003 Municipal Experience: Joaquin Vargas is an accomplished transportation engineer specializing in traffic engineering, parking studies, traffic impact studies, access, internal -site circulation, traffic concurrency, Development of Regional Impacts (DRI), pedestrian mobility studies, safety evaluations, and signal warrant studies. He has reviewed hundreds of traffic studies and site plans on behalf of municipalities, especially for the City of Sunrise. Furthermore, Mr. Vargas has conducted over 200 traffic engineering assignments for the Florida Department of Transportation (FDOT). He is currently serving as traffic consultant to the cities of Sunrise, Oakland Park, and Coral Springs. He has also provided traffic engineering consulting services to the cities of Bay Harbor Islands, Cooper City, Destin, Fort Lauderdale, Hollywood, Homestead, Lauderdale -By -The Sea, Miami, Miami Beach, Miami Springs, Miramar, North Miami Beach, Ocala, Pembroke Pines, Pompano Beach, Surfside and Tamarac. Mr. Vargas has also served as expert witness for the public and private sectors. For the FDOT, Mr. Vargas served as expert witness on several cases involving parking, access, and internal site circulation. He also represented the City of Tamarac in a traffic - concurrency related case. Representative Projects: Traffic Engineering Services for the City of Coral Springs: Mr. Vargas has been serving as traffic consultant to the City of Coral Springs since the late 1980's. In this capacity, he has reviewed hundreds of applications from traffic and safety standpoints. He has reviewed site plans prepared by others from access, parking, stacking, and internal site circulation standpoints. Mr. Vargas has reviewed numerous traffic studies prepared by others for new projects within the City of Coral Springs. Traffic Consultant for the City of Sunrise: Between 1996 and 2005, Mr. Vargas served as traffic consultant to the City of Sunrise. In this capacity, he assisted the city in convincing the developers of the Florida Panther's arena that the best location for the arena was next to the Sawgrass Mills (its current location). Furthermore, Mr. Vargas has been involved in reviewing most of the Sawgrass Mills expansions (DRI's), including the recently-closed Wannado City and Metropica projects. Mr. Vargas has been involved in the review process of numerous applications submitted to the City of Sunrise. These reviews have focused on traffic impacts created by the proposed projects, and site plan reviews. Pompano Beach Plaza Master Plan Project: As a sub - consultant to Bermello Ajamil and Partners, Traf Tech Engineering was retained by the City of Pompano Beach to conduct traffic and parking studies in connection with the Pompano Beach Plaza Master Plan project. The traffic study addressed the existing and future operating conditions of the study area, evaluated the effects of modifying existing traffic patterns such as implementing one -way streets, and provided recommendations regarding pedestrian facilities, public transportation, traffic calming, and access management in order to improve vehicular and pedestrian mobility within the study area. The parking study addressed the existing public parking facilities located within the study area, the existing parking demand of these public parking facilities, the future parking needs for the study area, and recommendations intended to improve parking conditions in connection with the Pompano Beach Plaza Master Plan project. Cbe.... . CONTINUING PROFESSIONAL SERVICES I RFQ NO I4 -07 -02 107 B O O STAFFING RESUMES TRAF TECH Joaquin E. Vargas, P.E. Traf Tech Transportation Engineer ENGINEERING. INC. Destin Harbor Parking Master Plan: Mr. Vargas served as project manager on a comprehensive parking study for the Destin harbor area. The study area was approximately one and one -half miles in length by one -half mile in width and included numerous marinas, hotels, restaurants, shopping centers, banks, offices, and specialty retail shops. The master plan consisted of a thorough evaluation of existing conditions, determined the current and future parking needs of the study area, identified and evaluated parking improvement alternatives, and recommended an action plan for the Destin harbor. A parking utilization study, including surveys and turnover data, was performed as part of this study. The Destin Harbor Parking Master Plan project also included an extensive public involvement campaign including numerous public workshops and a public hearing. Mr. Vargas also led the public involvement campaign for this project. Flex -Zone Modifications in Coconut Creek: Traf Tech Engineering, Inc. conducted a traffic study in connection with proposed flexibility zone modifications within the City of Coconut Creek. The study addresses the existing roadway conditions within the affected areas, and future operating conditions with and without the proposed flexibility zone modifications (including the reserve units). The City of Coconut Creek proposed to assign 706 flexibility units to specific areas within the city. These areas were designated as "Receiving Areas ". The majority of the "Receiving Areas" were located along Hillsboro Boulevard, Wiles Road, Sample Road, and portions of Coconut Creek Parkway, Atlantic Boulevard, Lyons Road, and State Road 7. Since the 706 residential units were accounted for in Broward County's FSUTMS model, and these residential units remained within the City of Coconut Creek (with a concentration of the flexibility units proposed along the corridors mentioned above), the traffic impacts associated with this modification was determined to be minimal. Traffic Engineer for the Sistrunk Boulevard Streetscape Project: Mr. Vargas served as traffic engineer on one of Fort Lauderdale's most challenging traffic calming projects... Sistrunk Boulevard. Opposed by high -level Broward County professionals, this CRA project consisted of reducing the number of through lanes on Sistrunk Boulevard from four to two. Mr. Vargas had the difficult task of ensuring that due to the reduction in vehicular capacity, neighborhood traffic intrusion was not going to be a problem. Several creative traffic engineering tactics were recommended in order to eliminate this political concern. Project Manager and Senior Traffic Engineer for the FDOT: Between 1996 and 2006, Mr. Vargas served as traffic operations and safety consultant to the Florida Department of Transportation (FDOT). During this period, he conducted over 200 traffic engineering assignments for the FDOT, including the Florida Keys Hurricane Evacuation Study completed in 2001. He has continuously provided hurricane evacuation assistance to the FDOT to the present (2013). CONTINUING PROFESSIONAL SERVICES I RFO NO. 14-07-02 108 0 0 0 0 O O O O O O O O O O 0 m 0 C A] STAFFING RESUMES CMS - CONSTRUCTION MANAGEMENT SERVICES. INC. S CONSTRUCTION MANAGEMENT SERVICES, INC. KEITH (ARMON PHILLIP) EMERY Principal -in- Charge Education: Bachelors Degree in Civil Engineering and Construction Management with a Higher National Certificate (H.N.C.) Diploma in Quantity Surveying and Estimating from the University of Lancashire (London, England) Work Experience: Over forty years of experience that includes eleven years self-employed as President of a General Contracting./Management firm in the Caribbean and Europe and 38 years as President of CMS-Construction Management Services. Inc. (established in 1980, incorporated in 1976); Expert Witness Services provided for numerous court cases Professional Backeround: High rises, offices, condominiums, townhomes, single - family homes, shopping centers, airport facilities, cruise -port facilities, service stations, banks, drainage systems, sewer /water mains and pumping stations, museums, auditoriums/theaters, cultural arts centers, schools (K -12). colleges and universities, hospitals and medical facilities, storage and maintenance facilities, highways and secondary roads, bridges, parking garages, parks, community and recreational centers, libraries, country clubs, hotels and resorts, public safety facilities, courthouses and judicial complexes, police stations, fire stations, various state and federal government projects, etc. Project Experience: Construction,tfanagemenNOrvner's Representative (Park Projects): Broward County — Vista View Park Expansion (Davie) and Prototype Park Facilities (includes Tmdewinds Park in Coconut Creek and Carver Ranches Park in West Park) • City of Coconut Creek — Community Centers at Lakeside Park, Sabal Pines Park, and Donaldson Park; also. Fem Forest Nature Center, and Windmill Park's Ted Thomas Recreation Center a City of North Miami Beach — Taylor Park, 167'" Street Athletic Field, and Washington Park • City of Fort Lauderdale — Joseph C. Caner Park • City of Deerfield Beach — Pioneer Park Community Center (Phase 1) Ouantiri• Survet orlCost & Oualiri' Consultant (Dn elopmenyExpansionlRenovaiion of Parks): City of Fort Lauderdale — Everglades Holiday Park • City of Hollywood — Young Circle Arts Park New Visual Arts Building • Palm Beach County — South County Regional Park (Boca Raton) • Martin County— Halpatiokee Regional Park Site Improvements (Stuart) • City of Fort Lauderdale — Civil Peoples Park • City of Parkland — Westem Park Community Center and Amphitheatre • City of Lauderdale Lakes — Northgate Park Expansion • City of Miramar — Cultural Arts Center /Arts Park • Town of Davie — Potter Park (Community Center and Gymnasium) • City of Boca Raton — Countess de Hoemle Park • Village of Royal Palm Beach — Commons Park (New Clubhouse and Sporting Center) • City of Miami — Museum Park Miami and Jose Marti Park Renovations • City of Miami Beach — Grapeland Park and South Pointe Park Improvements and Pier Project • City of Miami Lakes — Royal Oaks Park Community Center • Sunny Isles Beach — Heritage Park and Parking Garage • University of Miami — Wellness Park Other Expertise in the Construction - Related Field: Expert Witness, Feasibility Studies, CPM Scheduling, Claims Avoidance /Analyses/Negotiations, Development of Projects of Various Sizes. Residential and Commercial Building Inspections, and Consuuctability Reviews Professional Organizations and Affiliations: Certified Contractor Instructor for Department of Transportation • Past Chairman of the Board. Deerfield Beach Housing Authority • Past Director, Pompano Beach Chamber of Commerce a Past Director, Deerfield Beach Chamber of Commerce • Life Member of the Organization of Chartered Quantity Surveyors (London. England) QUANTITY SURVEYORS COST CONSULTANTS CONSTRUCTION MANAGERS CONTINUING PROFESSIONAL SERVICES I RFO NO. 14 -07 -02 109 4) O • APPROACH / METHODOLOGY DESIGN PHILOSOPHY. APPROACH & OVERALL ORGANIZATION TO COMPLETING THE PROJECT B &A projects are each born of a creative, problem - solving process. As a result, our Clients are assured of a product that not only meets their requirements, but exemplifies quality, function, enduring and very often, award - winning design. B &A has significant experience in the public sector work throughout the United States, Europe, South and Central America, and the Caribbean in several disciplines, including planning, landscape architecture, urban design and construction. B &A's landscape and architectural design philosophy is anchored by a series of principles that are time tested. Our philosophy is composed of a number of concerns that are: • Client Focus /User Needs Driven - Serving the client's needs is paramount. Understanding user needs is crucial to create projects that respond to what the user desires and what will work for the specific user group; • Context Sensitive Design - Designs need to respond to the specific context that surrounds it and within which it has to function; • LEED /Sustainable Design - Responding to environmental conditions and providing for designs that are sustainable is paramount. Sustainability has many definitions, from the economic, to building construction and operations to relationship with the environment and urban systems. We strive to respond to these conditions; • Multi - Disciplinary Approach - Our professional in -house team includes urban designers, planners, architects, landscape architects, interior designers, and marine engineers. As may be required we bring to bear on projects the full expertise of our in -house staff and our sub - consultant; • Implement Latest Technology (BIM) - We strive to implement the latest technology for assisting us in the design process and construction administration process; • Creative Designs - The creation of Delight, providing creative designs is the final most important ingredient to development of successful project and the relationship between B &A, the Client and the community; • Technically Correct - Through our preparation of design and construction documents ascertain the project's constructability and its adequate function through time; • Cost Control - We strive to meet the Client's budgetary constraints while providing a product that is aesthetically pleasing and functionally correct. Our design philosophy is founded on the premise that successful projects are welcomed by the public, technically and environmentally sound, cost effective, completed on -time and within budget. Successful projects require a thorough understanding of our Client's needs and goals as well as methodical planning with respect to existing conditions, permitting, budgetary constraints, scheduling, security and long term maintenance. Our past experience has taught us that by listening, partnering and becoming on extension of our Client's staff we develop a foundation for a successful project. Understanding the Client's Need and Goals We believe that our Clients are our best source of information and therefore we partnerwith them to develop realistic goals and expectations that become the corner stone of a project's deliverable expectations with respect to design, scheduling and available construction budget. �� ",,,�•,,,,,,,,,�,• CONTINUING PROFESSIONAL SERVICES I REO NO. I4 -07 -02 110 4D [17 0 APPROACH / METHODOLOGY Existing Conditions We develop solid technical innovative designs based on a thorough understanding of the existing site conditions through the review of surveys, geotechnicol testing reports, as -built plans, existing reports, utility markups and public sentiment. Permitting An understanding of the regulatory permitting requirements and the limitations that these requirements pose on the design of the project will be clearly identified prior to engaging in the design of the project. We will identify and understand these requirements and build into the project the necessary components to avoid cost over runs and construction delays associated with regulatory permitting. Budgetary Constraints We design to meet our Client's budgetary constraints. We will assist the City of Sunny Isles Beach in establishing project budgets, tracking the project costs through all phases of the work and, if needed, value engineer the project to ensure that it is within the established project budget. Scheduling We develop flexible project schedules that are based on realistic goals, task identification and task interrelationships. We will confirm that each task fits within the overall project and target dates and provides for contingencies within the work plans. Public Outreach We assist our Clients in developing public awareness programs that promote public buy -in to pork development projects through activities such as forums, open houses, community meetings quarterly newsletters websites and public hearings. We have a seasoned in -house staff that has directed numerous important community awareness programs. MANAGEMENT METHOD B &A understands that a strong project management program is crucial to the success of a project. B &A has developed on extremely effective methodology for its projects. It starts by understanding both the micro and macro issues. The most critical first step of any project is the preparation of a preliminary performance schedule and project management strategy. The performance schedule will identify all required steps and milestones necessary to take the project from start to completion. It also allows the entire team to understand the overall scheduling strategy necessary to accomplish all the tasks in the correct sequence. In addition to the performance schedule, B &A will implement the following project management tools for the projects that arise from this contract: Project Guidelines At the start of the project, B &A will prepare Project Guidelines which will include all requirements by the review agencies, code requirements and design approvals the project must follow by City, County, State and Federal jurisdictions. In essence, this will provide a manual to the entire team establishing the "Authority Having Jurisdiction" for the project. Cba _.. _ CONTINUING PROFESSIONAL SERVICES I RFC) NO. 14 -07 -02 111 APPROACH / METHODOLOGY Communication It is critical at the start of the project to establish proper protocol and follow a "Chain of Command" and point of contact for each discipline. This will assure agreement on the format for faxes, memos, phone conversations and e- mails. A Team Directory is distributed to all involved parties. Team Directory The Team Directory includes the entire design team and their role or responsibility, addresses, phone, fax and cell numbers and e -mail addresses, the review agencies contacts and any others participants that are involved in the project. Team Meetings For each project phase (design development, construction documents, permitting bidding and negotiations and construction administration) B &A will prepare a schedule for team workshops and team meetings to insure that decisions are made when needed and the momentum of the project remains constant during the entire project. Action Items / Hot List As part of the meeting minutes that are prepared, B &A prepares a "Hot List ", which is a comprehensive list of issues and action items that require resolution by established key dates. The Hot List is always reviewed at every team meeting and tracks the development and /or progress of items that are on the "Critical Path of Travel" for that particular phase. ABILITY TO MEET DESIRED TIMELINES: SCHEDULE AND COST CONTROL Maintaining the established project schedule and costs will be critical to the success of this project. B &A understands this and has been successful at developing many projects "under budget and ahead of schedule ". This track record has been accomplished through a series of in -house management procedures as described below. Quality is an important issue that must be addressed throughout the entire project. A consistent philosophy must be set which will be carried through the planning, design and construction process. B &A has a companywide Quality Control Program that will commence at the start of the project. This provides for a continuous check process and quality assurance throughout the entire development of the project. It is our firm's view that quality work is the direct result of careful, properly sequenced production, and continuous "responsible professional" checking of each work element for completion and correctness. Our Quality Control Program performs detailed checks for accuracy, errors and omissions prior to substantial completion and before each "phase" submittal for the City's review. Established checking procedures are at each "phase" of the design to assure our special effort to produce accurate documents and "red flag" elements that need further attention. This allows continuous monitoring and coordination of all aspects of a project, assures the inclusion of any City of Sunny Isles Beach staff review comments and requirements and results in the acceptance of only high quality work. 3b a.... CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14-07-02 112 APPROACH / METHODOLOGY The Quality Control Principles we will utilize to Control Costs and Maintain the Schedule are: Keep the Team Together for the Duration of the Project: The nature of this contract is such that with a team of professionals who have gone through the learning curve, understanding needs, prioritizing responsibilities and preparing documentation to complete assignments the project tasks and milestones will become easier and faster to complete. The end result is less cost and faster results as the project progresses from concept through construction. Listen to the Client: Nobody knows this project better than you, the Client. It is our job to translate your wishes and concepts through the creative process. Our team experience allows us to quickly gather the information you have available so we can ask the pertinent questions. This simple, effective and necessary step will allow us to communicate with you from the beginning. Document the Progress and Decisions Thoroughly: After listening to you, reaching conclusions and determining direction we will document the discussions and what was agreed. Meeting minutes will be issued to all present and to team members, affected or not, to ensure record keeping, memorializing the interaction and for the purposes of tracking responses, deliverables, milestones as well as utilizing this tool to track the schedule. Conduct Methodical Plan Checks and Reviews: We will establish and schedule plan checks and reviews. Agendas, lists of hot issues and criteria will be gathered before the checks, reviews and coordination efforts. Focused, targeted and goal minded meetings will run regularly to keep the project on track, on schedule, coordinated and within the bounds of the QCP. Project Schedule Maintenance: Our team will participate in the preparation of the initial schedule for this assignment. Maintaining a schedule allows realistic goals to be met, tasks to be identified and interrelationships to take place. These efforts foster communications for the benefit of cooperation and coordination of efforts and results. The maintenance of a project schedule is the best way to add, reduce and manage contingency plans for all interacting participants. When the project reaches the construction phase, we will assure that every effort is made to see that construction proceeds in accordance with the contractual requirements, plans, specifications, and applicable codes in force at the time of permitting. As part of this quality control process, samples of materials, shop drawings, mock -ups, etc., may be required prior to the commencement of the physical work of that component from various contractors or subcontractors to establish acceptable levels of workmanship. A control process is then put in place to document and ensure that these goals are delivered, while maintaining direct communication with the City staff to advise on the status of approved work, specification infractions and corrective measures. The purpose of this ongoing program is to assure the implementation of the project is in accordance with the contractual requirements, plans, specifications, applicable codes, accepted industry standards and within a predetermined cost and time framework. Permitting Management Approach The key to successfully and rapidly acquiring permits requires a clear understanding of the time frames associated with each permit and a carefully crafted permitting plan that takes advantage of permits that can be applied for in parallel therefore reducing the length of the permitting phase of the project. The C� CONTINUING PROFESSIONAL SERVICES I RFO NO. 14-07-02 113 APPROACH / METHODOLOGY following streamlined permitting management approach has been implemented by B &A resulting in a considerably abridged permitting phase: Assign Permit Coordinator and Setup Tracking Software - Our project manager assigns a permit coordinator to coordinate the permitting through the required agencies. We utilize Microsoft Outlook to keep track of when the plans /permits are submitted and to provide reminders of when a courtesy call should be made to stay abreast of the review process. We also use this software to remind us when the review comments /approved plans and permits should be ready based on the time the agencies have to complete a review. Pre - Submittal Meeting - The B &A Project Manager and project coordinator schedule and attend a pre - submittal meeting with each agency having jurisdiction over the project. The purpose of the meeting is to explain the critical components of the project to the key reviewers so that the project is expected by the agency and understood from a design point of view. This meeting also fosters an understanding of urgency associated with the project and establishes a personal rapport between B &A and the regulatory staff. Check Modifications Requested by Agencies - Every modification to the plans requested by a permitting agency is carefully considered by the Project Manager for necessity, conflicts with other applicable codes as well as compliance with City standards and specifications prior to being incorporated in the plans. Documentation - All meetings, agency RFIs and telephone conversations associated with the permitting process will be documented with minutes and distributed to all involved. We believe that this is a critical component of the permitting process because the turnover rate of some of the regulatory agencies is high. To maintain established project costs and schedule, we have Included CMS - Construction Management Services on our team. This firm has extensive experience in this area of project management and will be consulted on on ongoing basis throughout all phases of project development. At the regular meetings held with City of Sunny Isles Beach staff, we will review and update the schedule and construction cost estimate as necessary. The project team will meet weekly with City staff to update them on the progress of the project and assure that the budget and schedule are being met. CONTINUING PROFESSIONAL SERVICES I RFO NO. 14 -07 -02 114 0 11 City Commission Norman S. Edelcup Mayan Isaac Aelion vice Maya Jeanette Golfo Commissioner Jennifer Levin Commissioner George 'Bud "Scholl Commissioner Christopher J. Russo City Manager Hans Ottinot City Attorney ('"` OF SUN e July 31, 2014 RE: Bermello Ajamil & Partners, Inc. To Whom It May Concem: I am the City Engineer for the City of Sunny Isles Beach and am responsible for managing the delivery of a variety of Capital and Public Works projects. We recently completed construction on two parcels for our Intracoastal Park system and have just started construction on a third and final phase at the Arlen House. Bermello Ajamil & Partners. Inc. (B&A) has been integral to these projects and they continue to provide professional services of the highest caliber oftentimes under what is often very difficult or nearly impossible deadlines. On these projects, the B&A Team assisted the City from the initial conceptual site Jane A. Hines planning phase and renderings through to the final bid /construction documents and City Clerk, CMC project closeout. They provided Construction Administration services for the completed parks and are under contract for the final phase. Under all phases of services, they have always been very responsive to our needs and requirements. The completed parks opened on time and have been very well received from the public, City management and elected officials. My experience with B&A throughout these projects has been outstanding and the work produced by the team not only met, but exceeded our expectations. Their expertise and available professional resources is very impressive. In addition to the experience with Sunny Isles Beach, my professional experience working with B&A extends back many years before my tenure at Sunny Isles Beach when I was with another municipality in Florida. At that time, Randy Hollingworth, Director of their Landscape Architecture Department worked with me on the development of another community park. His sensitivity to community issues and willingness to develop a plan that met the community's needs was a real asset as we moved forward with that park master plan. I recommend Bermello, Ajamil & Partners without hesitation. Helen Gray, PE City Engineer 115 0 0 0 0 0 0 0 0 C 0 0 0 0 0 0 B • 4 0 0 0 MW POMPANO BEACH P. O. Drawer 1300 Phone: (954) 786 -5535 Pompano Beach, FL 33061 Fax: (954) 786 -7836 April 21, 2010 Miami Community Redevelopment Agency (CRA) 49 NW 5 Street, Suite 100 Miami, FL 33128 RE: Bermello Ajamil & Partner, Inc. - Letter of Recommendation To Whom It May Concern: I am happy to recommend Bermello Ajamil & Partners, Inc. ("BA') and I take this opportunity to provide you some additional information, which may be useful during your review of the firm. The firm strives to keep us informed of any progress and status of each assigned projecL BA personnel is courteous and responds to requests in a timely manner using a variety of methods including, but not limited to, telephone calls (regular and cells), e- mails, mail, and in person (meetings or periodic visits} The firm is very familiar with our Agency's needs and/or assigned project(s) and has demonstrated a comprehensive knowledge of our present infrastructure. This is the result of working together and combining forces every step of the way. The firm has assisted the CRA in implementing specific services aimed at meeting State and Comity requirements. It is our belief the firm is widely knowledgeable of governmental funding avenues, i.e. SFWMD, FEMA etc., and at the present time, the firm is assisting the CRA to obtain a series of permits and licenses for a sizable venture. The firm is presently under contract to provide professional services (i.e., civil engineering, architectural landscaping, lighting, site planning, to name a few) as a prime or sub-consultant for the following projects: • East Atlantic Boulevard (prime, $1,000,000.00) — Roadway /Streetscape Design including widening sidewalks, additional drainage, narrow existing roadways, widening landscape medians. • Harbor Village (prime, $1,000,000.00) — Civil and Architectural Landscape Design including widening sidewalks, additional drainage, reconfiguration of an existing public parking facility, landscape plans. • Pompano Beach Boulevard (sub - consultant, $7,000,000.00) — Civil and Architectural Landscape Design including widening sidewalks, reconfiguration of an existing public roadway, beach plaza and on- street parking facilities. • Collier City (prime, $110,000.00) — Planning services for a Neighborhood Plan to identify needs, funding sources, etc. ns IV N'W POMPANO BEACH P. O. Drawer 1300 Phone: (954) 786 -5535 Pompano Beach, FL 33061 Fax: (954) 786-7836 To the best of my knowledge the firm has a good working relationship with executive and legislature branches of the state and county elected officials. In addition, it is my understanding that members of the firm are actively involved with other government agencies. The firm works and coordinates activities very well with other consultants and maintains a professional level of communication with all other members of the design team(s). In addition, the firm interacts as a team member with other engineering funs working for the City on a variety of multi jurisdictional projects. I have personally known the firm or representatives from the firm for quite sometime and I consider the firm a professional outfit with a professional attitude. Every member of the firm with whom I had the pleasure of working with has shown an ability to communicate, coordinate activities, follow up with updates and progress information, and do the work proficiently. I have no qualms in stating that the firm is at the top of my list of vendors for any engineering and architectural services related work. If you require any further assistance, please do not hesitate to contact me at (954) 786 -7834. CRA Engineer 117 • 0 • 0 0 • • • • • • • • • • • • • • • • • • • • • • • e 0 • M.ARC U. S.ARNO[ I' B1vnl Chair February 6, 2014 RE: Business Reference for Bermello Ajamil & Partners, Inc. Design Criteria Package Consultant Services To whom it may concern: I'll-[ ER A. BOCKWEG 1 �nvlicr Dirmlu The City of Miami Omni Community Redevelopment Agency (CRA) last year selected and retained Bermello Ajamil & Partners, Inc. (B &A) via a competitive vetting process as the Design Criteria Consultant for the Miami Media and Entertainment Complex (MEC). The MEC is an 85,000 SF facility owned by the Omni -CRA with an estimated redevelopment budget of $11,000.000. B &A's services proved invaluable as our agency developed a Design Criteria Package to accompany a future advertisement soliciting design - build- operator proposals. The B &A team was instrumental in helping to define and document our vision for a state -of- the -art production complex and the criteria for the redevelopment of the existing building and site. Their Design Criteria services were comprehensive and included: architectural and engineering technical services; evaluating the existing structure and historical research; programming; code analysis; public involvement and community outreach workshops; conducting steering committee charrettes: assistance in drafting the design - build - operate request for proposal (RFP); and evaluating design - build - operate UP responses. The Miami Media and Entertainment Complex is highly anticipated within the community and an integral pan of the ongoing transformation of the Omni -CRA District. In addition to the unique technical qualifications necessary for this commission, the MEC Design Criteria Package required a team able to adhere to rigorous schedules and perform under the close scrutiny of the community. B &A's expertise and thoroughness exceeded our expectations in a Design Criteria Consultant and allowed them to excel at all of these challenges. I feel confident in recommending Bermello Ajamil & Partners as you select a Design Criteria Consultant and trust that, if selected, you too will be equally impressed with their proficiency. Sinc/erely. Pieter A Bockweg Executive Director uMW Cll?IMUNII\ RIEDEVELOPMENI AGENCY111 IM CIl Y111'.. \I IA,MI 14411 N Miami A,, 12 11 hnn I Miami. 1'1, 111 i6 I 0015167 h$6T I hllp:', nx nnami.ClA.mF 118 REFERENCES City of Sunny Isles Beach City of Miami Springs Helen Gray Ron Garland City Engineer City Manager T: 305.792.1711 T: 305.805.5010 Harav @sibfl.net Gorlandr @miamisorinas -fl.gov City of Homestead William Alonzo Dennis Mayton Assistant City Manager / Finance Director Parks & Recreation Director T: 305.805.5020 T: 305.224.4570 Alonsow @miamisorings -fl.aov Dmaytan@citvofhomestead.com Tommv.aood @coobfl.com City of Key West City of Pompano Beach CRA Don Craig Horacio Danovich Planning Director CRA Engineer T: 305.809.3728 T: 954.786.7834 Dcraia @kevwestcitv.com Horacio.Donovich @copbfl.com Ronald.Wallace@dot.state.fl.us Village of Pinecrest City of Miami Omni -CRA Yocelyn Galiano Gomez, ICMA -CM, LEED GA H. Bert Gonzalez Village Manager T: 305.679.6852, T: 305.234.2121 Hbaonzalez @miamiaov.com Ygaliano @pinecrest -fl aov Pieter A. Bockweg Maria Alberto Menendez, ICMA -CM Executive Director Assistant Village Manager T: 305.679.6868 T: 305.234.2121 Pbockwea @miamigov.com Mmenendez @oinecrest -fl.gov Cba..a._ k CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14 -07 -02 119 City of Pompano Beach FDOT District IV Tammy Good Ronald Wallace Project Manager Project Manager T: 954.786.5512 T: 954.777.4641 Tommv.aood @coobfl.com Ronald.Wallace@dot.state.fl.us Village of Pinecrest City of Miami Omni -CRA Yocelyn Galiano Gomez, ICMA -CM, LEED GA H. Bert Gonzalez Village Manager T: 305.679.6852, T: 305.234.2121 Hbaonzalez @miamiaov.com Ygaliano @pinecrest -fl aov Pieter A. Bockweg Maria Alberto Menendez, ICMA -CM Executive Director Assistant Village Manager T: 305.679.6868 T: 305.234.2121 Pbockwea @miamigov.com Mmenendez @oinecrest -fl.gov Cba..a._ k CONTINUING PROFESSIONAL SERVICES I RFQ NO. 14 -07 -02 119 O O O O 0 0 0 0 0 O O O O O O 4) 4) 4) O •'ry or suN'' - DELIVER TO., REQUEST FOR City of Sunny Isles Beach QUALIFICATIONS City Clerk SECTION 5 OPENING: 2:30 /2 0114 4 08/112/2 18070 Collins Avenue BID SUBMITTAL FORMS Sunny Isles Beach, FL 33160 Issued by: Purchasing Agent Date Issued: This Bid Submittal Consists of Andrew Rozwadowski 07/17/2014 Pages 16 through 19 Sealed bids are subject to the Terms and Conditions of this Request for Qualifications and the accompanying Bid Submittal. Such other contract provisions, specifications, drawings or other data as are attached or incorporated by reference in the Bid Submittal, will be received at the office of the City Clerk at the address shown above until the above stated time and date, and at that time, publicly opened for furnishing the supplies or services described in the accompanying Bid Submittal Requirement. RFQ 14 -07 -02 Continuing Professional Architectural & Engineering Services Firms Only (CCNA) ProcurementAoent Firm Name. Andrew Rozwadowski Bermello Aiamil & Partners, Inc. Commodity Code(s): RETURN ONE (1) ORIGINAL, ONE COPYAND ONE ELECTRONIC PDF COPY ON CD OR DVD OF BID SUBMITTAL PAGES AND AFFIDAVITS FAILURE TO SIGN PAGE 16 THROUGH 19 OF THE BID SUBMITTAL WILL RENDER YOUR BID NON -RESPONSIVE City of Sunny Isles Beach I Request for Proposal No. 14 -07 -02 120 1 O O 0 SECTION 6 BID SUBMITTAL FOR: ACKNOWLEDGEMENT OF ADDENDA INSTRUCTIONS: COMPLETE PART I OR PART II, WHICHEVER APPLIES PART I: LIST BELOW ARE THE DATES OF ISSUE FOR EACH ADDENDUM RECEIVED IN CONNECTION WITH THIS BID PART II: Addendum #1, Dated August 1, 2014 Addendum #2, Dated Addendum #3, Dated Addendum #4, Dated Addendum #5, Dated Addendum #6, Dated Addendum #7, Dated Addendum #8, Dated ❑ NO ADDENDUM WAS RECEIVED IN CONNECTION WITH THIS BID FIRM NAME: Bermello Ajamil & Partners, Inc. AUTHORIZED SIGNATURE: TITLE OF OFFICER: Vice President DATE: City of Sunny Isles Beach I Request for Proposal No. 14 -07 -02 OI SUN'S_ 121 • • • e • • • • • • • • • • • e • • • • • O • • 0 O • O O 0 •14 Or SUN P°. BID SUBMITTAL FORM Bid Title: Continuing Professional Architectural & Engineering Services Firms Only (CCNA) The undersigned Proposers proposes and agrees, if this Bid is accepted, to enter into an agreement with the City of Sunny Isles Beach to perform and furnish all Work as specified or indicated in the Contract Documents and in accordance with the other terms and conditions of the Contract Documents. The Proposers accepts all of the terms and conditions of this or Request for Qualifications. This Bid will remain subject to acceptance for 90 days after the day of Bid opening. The Proposers agrees to sign and submit the Agreement with the other documents required by the Bidding Requirements within ten days after the date of the City's Notice of Award. In submitting this Bid, the Proposer represents, as more fully set forth in the Agreement, that: The Proposer has familiarized himself /herself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Law and Regulations that in any manner may affect cost, progress, performance, or furnishing of the Work. The Proposer has given the City written notice of all conflicts, errors, discrepancies that it has discovered in the Contract Documents and the written resolution thereof by City is acceptable to the Proposer. This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation; the Proposer has not directly or indirectly induced or solicited any other Proposers to submit a false or sham Bid; the Proposer has not solicited or induced any person, firm or corporation to refrain from Bidding; and Proposer has not sought by collusion to obtain for itself any advantage over any other Proposers or over the City. The City and the successful Proposer will establish completion times for each individual Work Item and the successful Proposer agrees that the work will be completed within the time frames agreed upon and stipulated in the individual Purchase Orders and /or Notice to Proceed. Firm Name: Bermello Ajamil & Partners, Inc. Street Address: 2601 South Bayshore Drive, Suite 1000, Miami, FL 33133 Mailing Address (if different): City of Sunny Isles Beach I Request for Proposal No. 14 -07 -02 122 0 0 0 O Telephone No. 305. 859.2050 EmailAddre55: ASanchez @bermelloajamil.com No. 305.860.3750 No. 5/ 1 -1/L1 2/ 6 * "By signing this document the bidder agrees to all Terms (Signature of authorized agent) Print Name: Randy Hollingworth Title: Vice President OLO O Fc ry OI SUN of THE EXECUTION OF THIS FORM CONSTITUTES THE UNEQUIVOCAL OFFER OF PROPOSER TO BE BOUND BY THE TERMS OF ITS PROPOSAL. FAILURE TO SIGN THIS SOLICITATION WHERE INDICATED ABOVE BY AN AUTHORIZED REPRESENTATIVE SHALL RENDER THE PROPOSAL NON - RESPONSIVE. THE CITY MAY, HOWEVER, IN ITS SOLE DISCRETION, ACCEPT ANY PROPOSAL THAT INCLUDES AN EXECUTED DOCUMENT WHICH UNEQUIVOCALLY BINDS THE PROPOSER TO THE TERMS OF ITS OFFER. City of Sunny Isles Beach I Request for Proposal No. 14 -07 -02 JZ3 F �O ti U *WN N tip �9\ CITY NY I S�\ �s �F SUN P F\ City of Sunny Isles Beach I Request for Proposal No. 14 -07 -02 Of S0 1, 12 4) O O O O O O O O O 0 SV HNr 1j1F NON- COLLUSION AFFIDAVIT City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Faz (305) 949 -3113 STATE OF FLORIDA J COUNTY OF Miami -Dade ) The undersigned being first duly swom as provided by law, deposes, and says: This Affidavit is made with the knowledge and intent that it is to be filed with the City of Sunny Isles Beach City Commission and that it will be relied upon by said County, in any consideration which may give to and any action it may take with respect to this Bid. The undersigned is authorized to make this Affidavit on behalf of, Bermello Ajamil & Partners (Name of Corporation, Partnership, Individual, etc.) a Corporation formed under the laws of Florida (Type of Business) (State) Officer of which he is (Sole Owner, Partner, President, etc.) Neither the undersigned nor any person, firm, or corporation named in above Paragraph 10.2, not anyone else to the knowledge of the undersigned, have themselves solicited or employed anyone else to solicit favorable action for this Bid by the City, also that no head of any department or employee therein, or any officer of the City of Sunny Isles Beach, Florida is directly interested therein. This Bid is genuine and not collusive or a sham; the person, firm or corporation named above in Paragraph 10.2 has not colluded, conspired, connived or agreed directly or indirectly with any proposers or person, fimt or corporation, to put in a sham Bid, or that such person, fl" or corporation, shall refrain from Bidding, and has not in any manner, directly or indirectly, sought by agreement or collusion, or communication or conference with any person, firm or corporation, to fix the prices of said Bid or Bids of any other proposers; and all statements contained in the Bid or Bids described above true; and further; neither the undersigned, not the person, firm or corporation named above in Paragraph 10.2, has directly or indirectly submitted said Bid or the contents thereof, or divulged information or data relative thereto, to any association or to any member or agent thereof. Vice President AFFI�AN 'S NAME Randy aoiline r-h AFFIANT'S TITLE TAKEN, SWORN AND SUBSCRIBED TO BEFORE ME this day of \ \'�`/S� . 20q_(. Personally Known \ —_ or Produced Identification , Type of identification (Affix seal here) ash ne ANGEUGIGWZM MY COMMISSION t EE 114550 EXPIRES: July 21, 2015 DECEMBER 28, 2010 1 of 125 OHrv♦ „� lx PUBLIC ENTITY CRIMES City of Sunny Isles Beach 18070 Collin Avenue 'J�J • n o " ♦o Sunny Isles Beach, FL 33160 Telephone: (305) 9470606 Fax: (305) 949 -3113 SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a) FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES PUBLIC ENTITY CRIMES Pursuant to the provisions of paragraph (2) (a) of Section 287.133, Florida State Statutes - "A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a Bid on a Contract to provide any goods or services to a public entity, may not submit a Bid on a Contract with a public entity for the construction or repair of a public building or public Work, may not submit Bids on leases of real property to a public entity, may not be awarded to perform Work as a Contractor, supplier, Sub - Contractor, or Consultant under a Contract with any public entity, and may not transact business with any public entity in excess of the threshold amount Category Two of Sec. 287.017, FS for thirty six months from the date of being placed on the convicted vendor list ". THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS. 11.1. This sworn statement is submitted to City of Sunny Isles Beach by Randy Hollingworth - Vice President pnn m ua s name and uuel for Bermello Ajamil & Partners, Inc. 15nnt name o entity submitting sworn statemeri whose business address is: 2601 South Bayshore Drive, Suite 1000, Miami, FL 33133 and (if applicable) its Federal Employer Identification number (FEIN) is 59- 1722486 (If the entity had no FEIN, include the Social Security Number of the individual signing this sworn 11.2. 1 understand that a "public entity crime" as defined in Paragraph 287.133(1)(g), Florida Statutes, means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or with the United States, including, but not limited to, any Bid or Contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation. 11.3. 1 understand that "convicted" or "conviction" as defined in Para. 287.133(1)(b), Florida Statutes, means a finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trail court of record relating to charges brought by indictment or information after July 1, 1989, as a result of a jury verdict, non -jury trial, or entry of a plea of guilty or nolo contendere. 11.4. 1 understand that an "affiliate" as defined in Para. 287.133(1)(a), Florida Statutes, means: a.) predecessor or successor of a person convicted of a public entity crime; or b.) Any entity under the control of any natural person who is active in the management of the entity and who has been convicted of a public entity crime. The term "affiliate" includes those officers, directors, executors, partners, shareholders, employees, members, and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair DECEMBER 28. 2010 2 of 7 1Z(c 0 0 • • • • • • • • • • • • • • • 0 market value under an arm's length agreement, shall be a prime facie case that one person controls another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall be considered an affiliate. 11.5. 1 understand that a "person" as defined in Para. 287.133(1)(e), Florida Statutes, means any natural person or entity organized under the laws of any state or of the United Stales with the legal power to enter into a binding Contract and which Bids or applies to Bid on Contracts for the provision of goods or services let by a public entity, or which otherwise transacts or applies to transact business with a public entity. The term "persons" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in management of any entity. 11.6. Based on information and belief, the statement which I have marked below is true in relation to the entity submitting this sworn statement. (Indicate which statement applies.) X Neither the entity submitting this sworn statement, nor any of it's officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, nor any affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989- However, there has been a subsequent proceeding before a Hearing Officer of the State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer of the State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer determined that it was not in the public interest to place the entity submitting this sworn statement on the convicted vendor list. (Attach a copy of the final order.) I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 11.1 (ONE) ABOVE IS FOR THAT PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED. I ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES, FOR CATEGORY TWO OF ANY„/CHANGE IN THE INFORMATION CONTAINED IN THIS FORM. Randy Hollingworth (Printed Name) Vice President (Title) Sworn to and subscribed before me this day of 20'\'\ , by (AFFIX NOTARY EREG" 9 � "C'7 i.: MY C0MMISS10N 1 ff 114560 l �— g�� EVIRFS: J* 21, 2015 ei: eawealm rmyPdkU WWhM Signature: Notary Public —State of Florida Print or Type Commissioned Name Personally Known , OR Produced Identification Type of Identification Produced 1911998 3 of 7 12 SONNr �1�F EQUAL OPPORTUNITY �``;�f AFFIRMATIVE ACTIO City of Sunny Isles Beach 1a070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947-0606 Fax: (305) 94 9-3113 EQUAL OPPORTUNITY /AFFIRMATIVE ACTION STATEMENT The contractors and all subcontractors hereby agree to a commitment to the principles and practices of equal opportunity in employment and to comply with the letter and spirit of federal, state, and local laws and regulations prohibiting discrimination based on race, color, religion, national region, sex, age, handicap, marital status, and political affiliation or belief. Signed: Title: vice President Firm: Bermello Ajamil & Partners, Inc. Address: 2601 South Bayshore Drive, Suite 1000 oECE.KR28,2010 4 of 7 i Z8 • 0 O 0 0 SJN� Y _��FJ CONFLICT OF INTEREST City of Sunny Isles Beach 18070 Collins Avenue to +` Sunny Isles Beach, FL 33160 o, iu- ' Telephone: (305) 947 -0606 Fax: (305) 949-3113 CONFLICT OF INTEREST STATEMENT The award of any contract hereunder is subject to the provisions of Chapter 112, Florida State Statutes. Proposers must disclose with their Bids, the name of any officer, director, partner, associate or agent who is also an officer or employee of the City of Sunny Isles Beach or its agencies. STATE OF FLORIDA COUNTYOF Miami -Dade BEFORE ME, the undersigned authority, personally appeared Randy Hollingworth , who was duly sworn, deposes, and states: 18.1. 1 am the Vice President of Bemello Ajamil 6 Partners, Lnc. with a local office In Miami, FL and principal office In Miami, r'L 18.2. The above named entity is submitting a Bid for the City of Sunny Isles Beach, Bid No. 14 - 07 - 02 described as: Landscape Maintenance Services. The Affiant has made diligent inquiry and provides the information contained in this Affidavit based upon his own knowledge. 18.3 The Affiant states that only one submittal for the above Bid is being submitted and that the above named entity has no financial interest in other entities submitting Bids for the same project. 18.4 Neither the Affiant nor the above named entity has directly or indirectly entered into any agreement, participated in any collusion, or otherwise taken any action in restraints of free competitive pricing in connection with the entity's submittal for the above Bid. This statement restricts the discussion of pricing data until the completion of negotiations if necessary and execution of the Contract for this project. 18.5 Neither the entity nor its affiliates, nor any one associated with them, is presently suspended or otherwise ineligible from participation in contract letting by any local, State, or Federal Agency. 18.6 Neither the entity, nor its affiliates, nor any one associated with them have any potential conflict of interest due to any other clients, contracts, or property interests for this project. 18.71 certify that no member of the entity's ownership or management is presently applying for any employee position or actively seeking an elected position with the City of Sunny Isles Beach. 18.8 1 certify that no member of the entity's ownership or management, or staff has a vested interest in any aspect of the City of Sunny Isles Beach. 18.9 In the event that a conflict of interest is identified in the provision of services, I, on behalf of the above named entity, will immediately notify the City of Sunny Isles Beach. Date � 'U day of 1 \, � , 20' Faodv Hollinw rth - vice President Print or Type Name and Title � LL� I c Sworn to and subscribed before me this v day of ^�qL *- _2010. %' Personally Known OR O Produced Identification Type of Identification N I iC NOTARY PUBLI F.�t0 EJ(PIRES: Juy 21,2015 . ., ButleE tivuNWryRL6c Ltri0vrRes DECEMBER 28, 2810 5of7 i9q + ON :::"ra N, ,S2FJ f o' '• rro� ' or ,ate DISPUTE DISCLOSURE City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947 -0606 Fax: (305) 949 -3113 DISPUTE DISCLOSURE FORM Answer the following questions by placing a "X" after "Yes" or "No ". If you answer "Yes ", please explain in the space provided, or on a separate sheet attached to this form. 19.1. Has your firm or any of its officers, received a reprimand of any nature or been suspended by the Department of Professional Regulations or any other regulatory agency or professional associations within the last five (5) years? YES NO X 19.2. Has your firm, or any member of your firm, been declared in default, terminated or removed from a contract or job related to the services your firm provides in the regular course of business within the last five (5) years? YES NO X 19.3. Has your firm had against it or filed any requests for equitable adjustment, contract claims, Bid protests, or litigation in the past five (5) years that is related to the services your firm provides in the regular course of business? YES NO X If yes, state the nature of the request for equitable adjustment, contract claim, litigation, or protest, and state a brief description of the case, the outcome or status of the suit and the monetary amounts of extended contract time involved. I hereby certify that all statements made are true and agree and understand that any misstatement or misrepresentation of falsification of facts shall be cause for forfeiture of rights for further consideration of this Bid for the City of Sunny Isles Beach. Bermello Ajamil & Partners, Inc Firm Authorize Signature Date Randy Hollingworth - Vice President Print or Type Name and Title DECEMBER 28. M10 6 of 7 13 p o. ryr Crrr Or {UO ~O,` STATE OF FLORIDA ) COUNTY OF Miami -Dade) ANTI - KICKBACK City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 967 -0606 Fax: (305) 94 9-3113 ANTI - KICKBACK AFFIDAVIT I, the undersigned, hereby duly sworn and deposed say that no portion of this sum herein Bid will be paid to any employees of the City of Sunny Isles Beach or its elected officials as a commission, kickback, reward or gift, directly or indirectly by me or any member of my firm or by an officer of the corporation. By: Randy Hollingwoitth Title: Vice President The foregoing instrument was acknowledged before me this day of CN 01U5'1y 20 \1--t , by (Q)oLL:L4 [name of person], as V r-e 0(e3'a [type of authority], for cmLC \o Fk�a:r \C �c(cS.1sn� [name of party on behalf of whom instrument was executed]. AFFIX NOTARY STAMP HERE: A'"� �E� Notary Public — State'of Florida Y. { NY COWLS" t BE 114MO 3 .• EXPIRES! July 21, 2015 1 `eaaeaThunovrPDACUneeMEns Aor)A(0,, l7cncAc ) Print or Type Commissioned Name Personally Known 1n OR Produced Identification Type of Identification Produced 131 DECEMBER 28, 2010 7 of 7