Loading...
HomeMy WebLinkAboutSRS Engineering, Inc.E 1 [21- �v i d I- i J 0 4 0 Original City of Sunny Isles Beach lm j v P C�rY 0 SUnt Pub Request for Qualifications for Continuing Professional Services for Architectural, Landscape Architectural, Engineering and Land Surveying Firms Only (CCNA) (Engineering) RFQ No. 14 -07 -02 Submitted: August 12, 2014 5001 SW 74TH COURT, SUITE 201. MIAMI, FLORIDA 33155 TEL: 305-662-8887 FAX: 305- 662 -885B WWW. 5 R5-CORP.COM EB-00007317 5001 SW 74TH COURT, SMITE 201, MIAMI, FLORIDA 33155 TEL: 305- 662 -BB67 FAX: 305- 662 -BSSB WWW.SRS- CORP.COM EB- 000D7317 August 12, 2014 Sunny Isles Beach Government Center 18070 Collins Avenue, First Floor Sunny Isles Beach, FL 33160 AUG 1 2 2014 $- - /u a•33� Gj' I i ESLES F-:-:-C;: Re: Continuing Professional Services for Architectural, Landscape Architectural, Engineering and Land Surveying Firms Only (CCNA) Request for Qualifications No. 14 -07 -02 (Engineering) iDear Selection Committee, 1 We sincerely appreciate the opportunity to be considered for the above referenced contract and to acquaint you with our Team. The SRS Team is very familiar with the work to be performed as Engineering Consultants to the City of Sunny Isles Beach and feel our Team is uniquely qualified to provide the services required. We would like to submit our qualifications for consideration for providing the following specialized services: a Engineering For this contract, we have carefully assembled a team of experienced professionals that will assure the City the full range of services and capabilities needed on its projects. Our team consists of the following local firms: o SRS Engineering, Inc. (Prime /Civil /Structural Engineering) o Fandrei Consulting, Inc. (Traffic Engineering and Studies) o AMEC Environmental & Infrastructure, Inc. ' (Geotechnical /Material Testing/ Engineering Support) o Hadonne Corp. (Surveying and Mapping) 1 SRS Engineering, Inc. (SRS) is a consulting civil and structural engineering firm dedicated to providing professional engineering and construction management services to local governments and municipalities, as well as the private sector. Our staff is a highly motivated, 1 experienced group of professionals including engineers, designers, construction managers, Feld inspectors and support staff. SRS can offer the City of Sunny Isles Beach a broad spectrum of engineering services from investigation and feasibility reports to design, project management, construction administration, and construction observation. We have extensive experience in the design and construction management of municipal facilities, roadways, water and sewer systems and infrastructure projects. SRS Engineering, Inc. has provided civil engineering design services as well as construction management services to local municipalities for over 18 years. Currently, SRS is under contract to provide continuous miscellaneous services to the City of Hialeah, City of Miami, ' City of South Miami, City of Homestead and State of Florida Department of Military Affairs. We have extensive experience providing miscellaneous services to municipalities. Recent August 12, 2014 Page 2 projects include new roadways, drainage improvements, marine facilities, water and sewer pipelines and pumps stations, environmental studies, master planning, municipal buildings and parking areas, parks and recreational facilities, and construction administration services and construction inspections. These projects include the master planning and design of the water and sewer systems for the newly annexed area to the City of Hialeah, the design of over 26 miles of roadway improvement projects for the City of Hialeah, construction management and inspection services to the City of Miami and Master Consultant to Miami - Dade County DERM in charge of managing and overseeing over 490 roadway and drainage improvements throughout the County. SRS Engineering is a FDOT pre - qualified firm to perform engineering services. We are very familiar with FDOT LAP (ARRA) requirements. SRS has recently completed the design of W. 53rd Street Roadway Improvement Project for the City of Hialeah in accordance with the LAP guidelines. SRS has also worked on numerous municipal facilities including the City of Coral Gables Riviera Park, City of Hialeah Fueling Station, City of Miami Beach Maintenance Yard, and City 1 of Miami Springs Gymnasium and Community Center. Our Team will be led by Mr. Ignacio Serralta, P.E., who will serve as Principal -In- Charge. Mr. 1 Serralta has over twenty -five years of experience in civil engineering planning, design, and management for a wide range of public works, site development, and infrastructure projects. Mr. Serralta will be personally overseeing the management of the assigned projects and coordinating between the City and the SRS Team. Our Senior Project Manager will be Mr. Oliverio Sanchez, P.E. Mr. Sanchez has over thirty- ' three years of experience in project management and engineering design for both public and private sectors in fields such as land development and site planning, airport work on both landside and airside, port and marina developments, municipal engineering, storm water management and drainage engineering, roadway engineering, construction management, field supervision, and quality control. His extensive municipal project experience has provided him with broad knowledge in project coordination, dealing with governmental agencies and ' plan approvals and processing. Our Design Project Manager will be Mr. Jean - Claude Fontaneau, who has eighteen years of 1 experience in civil engineering design. He has been responsible for the planning and design of a variety of municipal and site development projects. Mr. Fontaneau is primarily responsible for the engineering design and preparation of plans and specifications including the design of pump stations, water and sanitary sewer pipelines, site development projects, roadway improvements, and storm drainage systems. Mr. Fontaneau was the project manager in charge of the design of several municipal projects including the City of Hialeah Pump Station No. 200, Hialeah Annex Water & Sewer Master Plan, Miller Road Widening and several municipal site improvement projects including parks, marinas and community centers. ' Our firm is further supported by an excellent group of consulting professional firms whose unique expertise and experience with similar public experience makes our group an exceptional team. Our combined strengths and capabilities will ensure this project's ' successful and timely completion. August 12, 2014 Page 3 Why Select the SRS Team In addition to possessing the qualifications and experience required to meet the challenges of this project, we believe the following items make our team uniquely qualified: o Our Principals and knowledgeable staff have extensive experience in the design and ' construction management of public and municipal projects. The SRS Team has worked on many similar projects and is very familiar with City of Sunny Isles Beach and local regulatory agencies' requirements. We have no learning curve! o SRS Team is a multi -facet team with extensive experienced in municipal engineering, as well as, in construction administration and inspections. We have experience in the design and construction of municipal facilities, roadways, marine, environmental, water and sewer systems, and infrastructure projects, including cost estimating, scheduling, inspections, and quality assurance. We "see" all sides of a project! The SRS Team can provide the same engineering professional and construction administration services as larger firms, but in a more responsive and cost - effective manner. When dealing with our Team you will be dealing directly with Principals who have the experience and authority to respond effectively to your needs. You can count on us! If selected, SRS Team will provide the City of Sunny Isles Beach with a well - articulated and dynamic group with talent, professional depth and proven experience. We are committed to the highest standards of excellence and dedicated to providing you with the best service possible. We value our commitment to the City and if given the opportunity to work for the City of Sunny Isles Beach, the SRS Team is committed to meeting our assignments, project requirements and schedules. Although we are not a large national firm, SRS has the capacity and resources needed to meet your needs. We are accustomed to designing and managing small, as well as, large and complex projects. What sets us apart is our commitment to principal involvement on every project. Our Principals and Project Managers understand the importance of exceeding our client's expectations which is evident by our long list of continued clients. Again, thanks for this opportunity to present ourselves. We are extremely interested in this assignment and we do look forward to working with the City of Sunny Isles Beach. Respectfully submitted, Igna ' Serralta, P.E. Pre ident City of Sunny Isles Beach Continuing Professional Services for Architectural, Landsc Architectural, Engineering and Land Surveying Firms Only Request for Qualifications No. 14 -07-02 (Engineering) Sr. Project Mantic Vice President Ignacio Serralta,,P.E: President Principal'In Charge Project Manager Delcy;Muhoz,Percy; -Alex Medina Design Engineers fRudVi AL'ENGINEER <Gis_ela. Rey, ,P.E. DESIGNERS Alex Morales, Nil Prieto, MaydiAlcaz Organizational 'Chart - SRS h' o, {„" - Mabel Rodriguez ,CIVILENGINEERS Steven'Fazil INSPECTORS Luis Hurtado Juan Carlos Seife uty of sunny Isles Beach Continuing Professional Services for Architectural, Landscape Architectural, Engineering and Land Surveying Firms Only (CCNA) Request for Qualifications No. 14 -07 -02 (Engineering) Oliverio Sanchey Sc Project Manager Vice President I City,of Sunny Isle_s;Beach ,'I Ignacio Serralta, P:E. President ' Principal In Charge CIVIL ENGINEERS Jean- Claude;Fontaneau 'Project Manager Detcy Murioz Percy. Alex Medina Design Engineers STRU&I RALENGINEER ;Glseta Rey, P.E. .DESIGNERS Alex 'Organizational Chart - SRS - �1 I, Office Adr Contracts Mabel Rodriguez Clerical/Marketing ,CIVIL-ENGINEERS Steven Fazeka. INSPECTORS Luis Huftado Juan Carlos Seife NY is - U S 1 FL °a�00 Company Information 'r or suN ►� r===4 Les 1 iJ 2 Qualifications Staffing f� Approach ® Methodology References Contract Forms Company Information o Name of Company: SRS Engineering, Inc. a Company Location(s): SRS Engineering, Inc.has one (1) location in Miami, Florida. o Internet Web Address: www.srs- corp.com o Details of Entity The Company is a Subchapter S Corporation. Business Structure: It is a Florida Corporation in good standing. a Date Founded: SRS Engineering, Inc.was founded on September 11, 1995. o Local Address: SRS Engineering, Inc. is located at 5001 SW 741. Court, Suite 201 Miami. FL 33155 a Telephone Number: (305) 662 -8887 o Outstanding Litigation: SRS Engineering, Inc. has no outstanding litigation that would threaten the viability of the firm or adversely affect the performance of this contract. Please see attached Summary of Litigation. o Proof of Insurance: Proof of insurance is enclosed on the following page. a Ability to begin Services: SRS Engineering, Inc. is able to immediately implement services on this contract upon receiving authorization to begin. Our workload is currently relatively light and expect to complete current main projects within the next couple of months. 5001 SW 74TH COURT, SUITE 201, MIAMI, FLORIDA 33155 TEL: 305662 -8887 FAX: 305-662 -8858 WWW.SRS-CORP.CDM ES- 00007317 Summary of Litigation History Since the inception of the company, SRS has only been involved in three lawsuits. In 2006, SRS Engineering, Inc., together with three other engineering firms as defendants, was involved in its first lawsuit. The lawsuit, brought by an individual plaintiff employed by another reengineering firm, pertains to Program Management contracts awarded to SRS Engineering, Inc. and the other three defendants as "Master Consultants" hired by Miami -Dade County's Department of Environmental Resources Management (DERM). The purpose of these contracts was to assist DERM's Division of Recovery and Mitigation (DORM) in the management of a FEMA grant for countrywide drainage mitigation and roadway resurfacing and reconstruction. The work was mandated because of damage sustained by hurricanes Irene and the so- called "No Name" storm. This case was settled with no admission of liability in August 2006. SRS's claim did not exceed $100,000. Claims Outstanding 2. Claimant: JAK Holdings (Case: #2012 - 728- CA -01) Project Name: Ponce de Leon Roadway Improvement — CEI Services Nature of Damages: SRS Engineering, Inc., together with the City of Coral Gables and Tran Construction is currently involved in a lawsuit. The lawsuit, brought by a plaintiff, owner of a building adjacent to a roadway construction project. The Plaintiff claims that the construction work has damage his building. SRS's role in the project was CEI inspector. All work was performed in adherence to the plans so we feel we should have no liability in this case. SRS is claiming no fault and is requesting to be released from lawsuit. Dates: March, 2012 3. Claimant: American Homes Assurance (Case: #10- 29797 -CA- 01(23)) Project Name: Drainage Plans for ADR Development Nature of Damages: ADR was sued by home owner for water damage done to home due to leaks and seepage. ADR's insurance company filed suit on all parties associated with the design of the house. Due to lack of grounds it appears the attorney assigned to us by RLI recommended we settle for the S2,000 now on the table to avoid any further legal fees. Payment was made in January 2013 and an order of dismissal with prejudice of SRS Engineering, Inc. was subsequently signed by the judge. Dates: December, 2010 — March, 2013 GQ 1 J Ignaci Serralta, P.E. SRS ngineering, Inc. Pres dent SRSENGI -01 ZGONZALEZ A`� ° CERTIFICATE OF LIABILITY INSURANCE 3/310114 n THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE(SSUINGINSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: H the certificate holder Is an ADDITIONAL INSURED, the policy(les) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement A statement on this certificate do" not confer rights to the certificate holder in lieu of such endorsements). raeascER Collinsworth, Alter, Fowler & French, LLC 8000 Governors Square Blvd Suite 301 NAME T Zoraida Gonzalez PHaNE .305 822 -7800 FAx Nu: 305 362.2443 EaoMOAgaESS: Z90 nzalez@cafflic.com Miami Lakes, FL 33016 INSURE 5 AFFTlRUN6 C(NEMOE fMIC4 WSURERA: Hartford Casualty $ 11000,0 PREMISE ao nxe,v mSUHFfl INSURER B:Travelers Casualty and Surety Company of America $ 10,00 SRS Engineering, Inc. ws,RPnc:RLI Insurance Company 13086 5001 SW 74th Court Suite 201 INSURER D: $ 2,000,0 WSURM E LLVRAPRIE$FER PR6 LOC Miami, FL 33155 INSURER F: $ Cr1VFRAGFS C.FRTIFICATF NIIMIRFR- RFVISInN NIUARFR. THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTKITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WTH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBID HEREIN IS SUBJECT TOALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. TYPE OF NSUlUNCE POLICY MIMBER �� NPOUCY W LLURS A OFINFJULWBnrTY TX=AEROA-OENERPLUAB11-,, OAL45-.VADE ❑X OCCUR 21SBAT04463 3/4/2014 314/2015 FAAI OCCIRdENCE $ 11000,0 PREMISE ao nxe,v $ 300,00 MTfl IXP orKr IINSC $ 10,00 PERSdVALAADVVIAMY s 1,000,0 GEIERAL AGGIEGATE $ 2,000,0 IiNLAGCREDATE X iOlf Y LLVRAPRIE$FER PR6 LOC FRDOULTS.CONPQP AGG s 2,000,00 $ AU UIUWrtY �ArO All DOTED $CIEDULEO AUTOS N1r05 KRID AUTOS PL/I/� v. aaodaa[ Ii BOCQY LVRfi1'�a RD�4 S eooaY eaR.m lPartotaQ s tWQH s s UMBRE MB EXCESSLIAB HOCCUR CUI o EACH CCCURR'1KE S ACOREOATE s DEO RErevrions Is B WORKERS ccvP m-noN AND EM0.0YFR5l1A&UTY YIN u+r PRORTIE(OR/PAPTHER(YEQIIiVE arncERUDaER txcuNOmT ❑y (WyyssfYf,, HOry In NHI O:SrfaP Q OFOf �ERATI0N5IMOx NIA B3294T108 812112013 8121/2014 - X NC STATLL OTH- E.L EAOIAIXXDEYT s 1,000,0 E1015FA5E. EA En S 1,000,00 EL dSEABE- NIX.I'LeaT S 1,000,90 C C rofesslona(Llab lalms -Made Basis IR DP0013445 DPOO13445 111011014 111011014 111012015 1110/2015 Each Claim 1,000,00 Anmral Aggregate 1,000,00 OFSCFIDina Liability etroactiveD te12tC1ES 96; Professional UabiwReoductibfo$ 5.00DEach llaiRWrMi Professional Llabiliry Retroactive Date 1212011996; Professional Llabi7iry Doducll6b f25,00D Each Claim "SPECIMEN" SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED W ACCORDANCE WITH THE POLICY PROVISIONS. ®1988 -2010 ACORD CORPORATION. All rights reserved. ACORD 25 (2010105) The ACORD name and logo are registered marks of ACORD Firm's Background and History SRS Engineering Inc was started by its current president and owner, Ignacio Serralta, in 1995 under the name Serralta and Associates, Inc. We soon began providing civil engineering services to local private clients and ' municipalities. Among our first public contracts were The City of Sweetwater and Florida International University. Within a few years, SRS grew to seven employees and began establishing a reputation for quality work and service. As our client base expanded, our firm grew and by the year 2000 housed a total of 12 ' employees. By this time, SRS had a long list of satisfied clients and had been awarded continuous miscellaneous contracts with Miami -Dade Parks and Recreation Department, Florida International University, Miami -Dade County Schools and The City of Hialeah. In 2003, SRS was awarded a large contract with DERM as a Master Consultant for the FEMA -DORM Project. Shortly thereafter, Pat Rebull, P.E. and Charles Serig, R.A. joined the firm as partners and the firm was renamed Serralta, Rebull, Serig, Inc. With the FEMA -DORM Project and the continued growth of engineering projects, the firm expanded to 24 employees. In 2004, SRS began providing land development engineering services and quickly established a long list of successful large ' land development projects and prominent local developers as clients. In 2005, Mr. Serralta once again obtained 100% ownership of the firm. The firm's name was changed to its current name, SRS Engineering, Inc., and moved to its current location in the Marina Lakes Business Park area of Southwest Miami -Dade County where it has continued to prosper. In 2009, Ms. Gisela Rey and Gustavo Gonzalez joined the firm and we began providing structural engineering design services. Today, SRS provides a wide range of services including general civil and structural engineering, and construction management and inspections. In addition to our focus on excellence in design and service, our firm is guided by principals who understand that in order for the firm to succeed it must have satisfied clients. Our Team will be led by Mr. Ignacio Serralta, ' P.E., who is owner and President of the Firm. Our Vice President and Senior Project Manager will be Mr. Oliverio Sanchez, P.E. who will serve as Principal -In- Charge. Mr. Sanchez is further assisted by Mr. Jean - Claude Fontaneau, our Senior Project Engineer. As a result, SRS's success is largely due to the principals' strong commitment to its clients and the quality of our work. Principals at SRS are involved in every aspect of the business from design and project management to employee recruitment. Project management and contract performance is personally directed by a principal who is thoroughly experienced, licensed professional engineer. This approach results in a very personalized service to every client with ease of communication and top talent on every assignment. The efforts of SRS' principals are complemented by experienced project engineers and talented professional staff that are adept at understanding clients' needs and work hard to deliver the results that clients want. • Today, SRS Engineering, Inc. provides services to a long list of clients in both the public and private sector and ' is currently under contract to provide miscellaneous municipal engineering services to The City of Hialeah, The City of Miami, City of Homestead, City of South Miami, Florida Department of Military Affairs, and Naranja Lakes CRA. SRS also provides services to a long list of private clients, including Shoma, Century Builders, ' Publix, Dr, Pepper, Hialeah Racetrack, UM, and many more. SRS's ability to weather this current economic downturn has been largely due to our long list of clients and our continued commitment to provide our clients with excellent service. Our principles and staff fully understand the importance of providing quality service and exceptional customer care. t SRS is currently home to 15 employees. Our professional staff includes 6 Civil Engineers, 1 Structural Engineers, 4 AutoCAD Designers, 1 Contract Support Specialist, 2 Construction Inspectors, and 1 Marketing Coordinator. 0 ENGINEERING,INC. General Qualifications SRS Engineering, Inc. has had the opportunity to serve several local municipalities and governmental agencies as consulting engineers, designing roadways, drainage systems, water and sewer pipelines, pump stations, parks, and provided construction management and inspection services on many more projects. SRS is currently providing Miscellaneous Engineering Services to the Cities of Miami, Hialeah, South Miami, & Homestead; Miami -Dade Water & Sewer Dept.; & Florida Dept. of Military Affairs. We have also provided various Civil Engineering services to the following governmental agencies • City of Coral Gables, Public Works Department • City of Hialeah, Streets Department • City of Hialeah, Water & Sewer Department • City of Hialeah Gardens o City of Homestead • City of Florida City • City of Miami, Department of Capital Improvements • City of North Miami Beach • City of South Miami • City of Sweetwater o Florida Department of Transportation o Florida International University o Florida Memorial University o Homestead Air Reserve Base o Monroe County n South Florida Water Management District o State of Florida Department of Management Services o State of Florida Department of Military Affairs o U.S. Department of Labor o Village of Bal Harbour o Miami -Dade County Public Schools o Miami -Dade County ° Miami -Dade County Aviation Department Miami -Dade County DERM Miami -Dade County Fire Rescue Department Miami -Dade County Housing Authority Miami -Dade County Parks & Recreation Department ° Miami -Dade County Performing Arts Center Miami -Dade County Police Department Miami -Dade County Water & Sewer Department FM , ,[ A [4nnic . aQ1 SRS has provided Construction Engineering and Inspection Services to the following governmental agencies: • Naranja Lakes Community Development Agency • Miami -Dade County Office of Capital Improvements • Miami -Dade County Department of Environmental Resource Management • City of Miami Office of Capital Improvements • City of Hialeah • City of Coral Gables COUNTiY, Ap iJ 7 � >«x,gy+��Lx*.c .u. ENGINEERING INC. «e. ,'y General Qualifications t SRS Engineering, Inc. has designed many recreational projects for local parks and for private developments. Our experience includes a multi -year consulting contract with Miami -Dade Parks and Recreation Department providing engineering design and construction management services. The following is a list of parks and recreational projects we have completed. These projects include several walkways /trails and bike paths, trail bridge, access roads, site development including clubhouses, restrooms, park facility buildings, picnic areas, an equestrian center with equestrian trails, canoe ramps, playgrounds, parking areas, water and sewer improvements, drainage improvements and marinas. All together, we have designed over 22 park and recreational projects. On most of these projects our task included the planning of site improvements including laying out of park facilities such as park administration and maintenance buildings, parking lots, access roads, field drainage improvements, water and sewer systems, sewer pump stations, and various walkways and bike paths. Our scope of work included the project management, coordinating the work with all the subconsultants, design and preparation of construction documents, specifications, preparation of construction cost estimates, permitting through the various regulatory agencies and departments, bid phase services including conducting pre -bid meeting and review of bids; and construction phase services which included conducting site inspections, responding to RFI's and review of shop drawing, and final close out. PARK PROJECTS o Crandon Park Marina and Golf Course — Miami -Dade County c Palmetto Golf Course — Miami -Dade County • Miller Lakes Park — Miami -Dade County • Matheson Hammock Marina — City of Coral Gables • Three Lakes Park — Miami -Dade County • North Trail Park — Miami -Dade County o Martin L. King Park — City of Miami • Reach Park — Miami -Dade County • Deerwood Park —Miami-Dade County n Miller Lakes Park - Miami -Dade County o Eureka Villas Park - Miami -Dade County o Eureka Park - Miami -Dade County o Casas Park - City of Hialeah • Southern Estates Park - Miami -Dade County • Spanish Lakes Park - Miami -Dade County • Virrick Park - City of Miami • A.D. Barnes Park - Miami -Dade County • Chapman Field Park - Miami -Dade County • Kendall Indian Hammocks Park - Miami -Dade County o Tropical Park Equestrian Center- Miami -Dade County o Riviera Park - City of Coral Gables 13 Salvador Park - City of Coral Gables i General Qualifications i SRS Engineering is a FDOT pre - qualified firm to perform a?y engineering services. We are very familiar with FDOT LAP` g.�,� �'U'. (ARRA) requirements. SRS has recently completed the design of W. 53rd Street Roadway Improvement Project for the City of Hialeah in accordance with the ARRA/LAP guidelines. In addition, SRS is currently providing CEI services for several new LAP /ARRA projects for the City of Hialeah and Coral Gables. These projects include the 1 -75 Ramp /NW 1381h Street, W. 41h Avenue, and Ponce de Leon Boulevard. SRS has recently completed work on two bridge projects, Black Creek Bridge and the Access Road and Bike Path Bridge for Chapman Field Park. The Chapman Field Park Bridge consisted of a 21 -ft wide bridge over a water crossing for canoes. In addition, our senior project manager and structural engineer have extensive experience in design of port and marine structures including docks, fender systems, harbor crane supports, wharf extensions, mega cruise ship terminals. Among the projects they worked on include the following: Berth 24 Extension, Port Everglades, Florida — Design and construction document preparation of 500 feet length of HZ combined wall system to extend the effective length of an existing pier in order to accommodate a new cruise ship. The project included the addition of four 150 ton bollards and fender systems. Berth 28 and 29, Port Everglades, Florida - Structural analysis for HMK -260E mobile container crane operation. Structural analysis to determine the feasibility of operating mobile harbor cranes HMK -260E at Berths 28 and 29. Disney Cruise Line Resort Island, Bahamas — Part of the team responsible for the structural calculations, construction document preparation and shop drawing review for this project which included a marginal wharf, the creation of an artificial berth island, a protective breakwater, a steel bridge and several fixed timber docks and platforms for recreational activities. Onyx Seawall Replacement, Miami, Florida — Replacement of more than 200 feet of existing seawall with a ' new sheetpiling wall for a new high rise building. Responsibilities included design, and construction document preparation. i Cypress Club, Ft Meyers, Florida — Private marina for two high rise residential buildings, with 520 feet of sheetpiling seawall and walkways, including breakwaters and piers to accommodate 70 boats from 30 to 56 feet length. Responsibilities included structural calculation, design, construction document preparation and dredging evaluation. Miami Circle Seawall Replacement, Miami, Florida — Replacement of more than 540 feet of a partially collapsed seawall with a new sheetpiling wall at Archeological Tequesta Circle in Miami River. Responsibilities included design and construction document preparation. NW 1381h Street Roadway Improvement, Hialeah, Florida — Design of over 700 linear feet of concrete pile and panel canal wall. n.. c,t General Qualifications DESIGN EXPERIENCE WITH ROADWAY AND DRAINAGE PROJECTS SRS has extensive experience in the design and construction management of roadway projects. SRS has designed roadways of several municipalities, Miami -Dade County and many private land development projects. Our most recent relevant project experience encompass several 1 roadway and drainage improvement projects for the City of Hialeah totaling over 26 -miles of roadways including E. 9th Avenue, S.E. 7th Avenue, W. 23rd Street and W. 36th Avenue (NW 97th Avenue). Other roadway projects include the design of the Miller Drive (SW 56th Street) widening, the extension of SW 120th Street, the widening of NW 138th Street and adjacent canal, and the entrance to Florida Memorial University. NW 138' Street, in particular, is currently under construction with a construction cost of over 512,450,000. This roadway project consisted a of 6 -lane divided roadway including continuous drainage system and street lighting (1.4 Miles); signalized intersections at NW 97th Avenue, NW 102nd Avenue, and NW 107th Avenue with double left turns and deceleration lanes; new 50' wide drainage canal including culverts and a canal wall along the north side of NW 138th Street between NW 97th Avenue and 1 -75. This project also required an extensive permitting including City permits with Hialeah, Hialeah Gardens, Miami -Dade County, DERM, FDOT, SFWMD, COE, and DEP. An Environmental Resources Permit (ERP) was required, cut and fill calculations, and wetland mitigation. .� ' -- � �' � � .•- � I, _1011 . . rAte$ In addition to our municipal roadway design experience, SRS has planned and designed over 550 -acres land developments projects within Miami -Dade County which included the design of all roadways and storm water management systems. Furthermore, an example our ability of manage large and complex project, SRS was the program manager (Master Consultant) for the DERM FEMA/DORM Program. The FEMA/DORM project is a jointly funded effort supported by the Federal Government, State of Florida, and Miami -Dade County intended to mitigate problems that arose as a result of Hurricane Irene (October 1999) and the "No Name Storm" (October 2000). As a Master Consultant we were responsible for the coordination of twelve (12) engineering design consultants and seven (7) land surveying firms involved in the design of approximately four hundred ninety (490) mitigation projects. These projects range ° from drainage improvements to total roadway reconstruction, canal dredging, culvert cleaning, and canal bank restoration. Additionally, we oversaw the construction efforts of five (5) ° ? contractors performing work with an estimated construction value of S35,000,000.00. Finally we were responsible for all document control related to these projects, approval of payment for design, survey, geotechnical reports, and construction in accordance with FEMA required guidelines. ENGINEERING,ING. .-. °��e I General Qualifications DESIGN EXPERIENCE WITH SITE /LAND DEVELOPMEN SRS is one of the top south Florida land development design firms. We have been the engineers on over 47 large land development projects within Miami -Dade, Broward, and St. Lucie Counties. Our firm provides full land development services from initial due diligence and feasibility studies to complete design all site improvement including roadways, drainage systems, stormwater management, lakes, canal, water and sewer systems, pump station, cut and fill studies, and all associated permitting. Among our recent projects include the following: -- Kendall Commons - SRS prepared all civil engineering design plans and specifications for the construction of an approximately 160 -acre traditional neighborhood district development comprised W-1 I I of 1,256 residential units, including townhouses, single family homes, live /work units, lofts, and flats; as well as over 132,000 sq. L..� ft. of commercial retail, 15 -ac lake, and a 9 -acre school. SRS services included the civil design of a regional sewer pump station (wet well /dry well) as well as on -site roadway, paving and grading, drainage and storm water management systems, water and sewer systems, design of off -site water and sewer systems and roadway improvements to SW 1671h Avenue and Kendall Drive. Other services included contracting and coordinating all topographical surveys and geotechnical investigations; all environmental studies including wetland mitigation reports and preparation of ERP permit. Permitting included all applicable regulatory agencies including FDOT, SFWMD, COE, DERM, MDWASD, MDPWD, FIRE, and Health Dept. Century Prestige – a ±96 -acre development north of Miami Lakes and south of the Broward line off of 1 -75. This project is comprised of 402 single - family homes with a 5 -acre lake and 3- acre marsh wetland with a tree island Bluewaters - 80 -acre mix -use Single Family/Townhouse development located south of SW 240th Street between the Florida Turnpike and SW 112th Avenue in southwest Miami - Dade Hialeah Palms - 114 -acre multi -use urban design neighborhood comprised of 933 residential units, including multifamily, townhouses, and single family homes; as well as 9.5 -ac wetland and a 5.8 -acres of parks and green areas in Hialeah Annex Area. Coral Keys Homes - 44 -acre Multi - family /townhome development comprised of 614 townhouse units. The project is locate north of E. Palm Drive (SW 344th St.) and SW 172nd Avenue in Florida City. SRS services included the civil design of all on -site roadways, paving and grading, drainage and storm water management systems, on -site lake and wetlands, on -site water and sewer systems, design of off -site water and sewer systems and design of SW 172n' Avenue roadway between Palm Drive and NW T" Street. Other services included contracting and coordinating all topographical surveys and geotechnical investigations; all environmental studies including wetland mitigation reports and preparation of ERP permit. \0 I General Qualifications 1 Master plans of water and sanitary sewer systems, hydraulic network analysis by computer, sanitary sewer collection and transmission systems including forces mains and gravity systems, water distribution ' and transmission systems, pump stations, wells, water treatment plants and special structures. Hialeah Annex Water and Sewer Systems and Master Plan - This work included the preparation of a water and sewer master plan for the area in order to determine the current and future service needs and the ' size and location /alignment of water and sewer main lines needed along the major arterial roadways. It also included the design of an 8.06 MGD regional sewer pump station with backup generator with In addition to our firm's vast experience designing local roadway and site /land improvement projects, our firm also specializes in providing municipalities with construction administration support services and construction engineering inspection (CEI) services. Our most recent relevant experience includes several roadway and drainage improvement projects /contracts for Miami -Dade County Public Works, DERM, City of Miami, City of Hialeah, and as Construction Consultants to the Naranja Lakes CRA. Among these projects were the NW 3rd Street and SW 69th Street Storm Sewer Projects for the City of Miami Office of Capital Improvements which had a combined construction cost of 52.3 million in roadway restorations, Pinehurst Storm Sewer Retrofitting Project which included roadway restoration and drainage improvements with a construction sufficient capacity to serve the entire annexed and adjacent areas. Additional work included the design of approximately 1,480 LF of 24 -inch gravity sanitary sewer mains, approximately 10,724 LF of 24 -inch force main extensions, approximately 3,229 LF of 36 -inch force main extensions, and approximately 12,166 LF of 36 -inch water main extensions. cost of 51.6 million and Avalon Storm Sewer Project which includes both roadway restoration and drainage improvements and has an estimated construction cost of over S3 million. Recently, our has been contracted to provide CEI services to several FDOT ARRA (LAP) projects for the City of Hialeah and Coral Gables. � ; --tee- m—,. �.'f' Ta- ENGINEERING,INC� "� %� 1 I Services Offered 1 o Project Management a Site Master Planning a General Site Civil Engineering c Structural Engineering o Site /Land Development o Roadway Design o Drainage & Stormwater Systems • Sanitary Sewer Systems • Water Distribution Systems o Pump Station Design • Lake Excavations / Land Fill • Marine /Coastal Engineering o Environmental Engineering o Value & Cost Engineering o Plans Processing & Permitting ROADWAY AND TRANSPORTATION • Educational & School Board • Due Diligence & Feasibility Reports o Construction Administration o Construction Inspection Services a Design -Build Services Roadway design including grading, paving, drainage, signage and markings, maintenance of traffic plans, traffic calming, bicycle paths, application processing, and permitting. WATER SUPPLY A N Master planning sewer collection D WASTEWATER SYSTEMS of water and sanitary sewer systems, hydraulic network and transmission systems water distribution and tran pump stations, wells, water treatment plants and special structures. DRAINAGE SYSTEMS Master planning of flood con drainage systems, flood pla storm drains, channels, pump LAND DEVELOPMENT cont analysis, sanitary smission systems, and drainage facilities, hydrology and hydraulic analysis of in studies, retention /detention water management systems, stations, drainage wells, and special drainage structures. Subdivision land use planning, zoning submissions, tentative and final tract maps, site development plans including grading, lakes, roadways, water distribution systems, sanitary sewer systems, and drainage facilities. Cut and Fill and water management studies, and permitting. ENVIRONMENTAL ENGINEERING STUDIES Environmental impact reports, environmental impact assessments, wetland restoration & mitigation, and environmental sensitive lands permitting and processing. STRUCTURAL ENGINEERING Structural design of concrete buildings, steel frame buildings, multistory buildings, and tilt -up construction. Marine and port structures including piers, docks, seawalls, marinas, fender systems, harbor crane supports, wharf extensions and mooring dolphins CONSTRUCTION PHASE SERVICES . Bid review, construction coordination, field construction managers and inspectors, monitor contractor's work, review and process contractors' application for payment, maintain daily project journals, administration of changed work, provide problem resolution, request and review material testing, coordination with utility companies, and project closeout. i Y.! Z 'f�. ' I Certifications and Awards SRS Engineering, Inc. has received technical certifications from the following agencies: ' MIAMI -DADE COUNTY 3.01 Highway Systems / Site Development and Parking Lot Design MIAMFDADE 3.02 Highway Systems / Highway Design ' 3.06 Highway Systems / Traffic Calming 3.09 Highway Systems / Signing, Pavement Marking, and Channelization 4.01 Aviation Systems / Engineering Design ' 5.01 Port and Waterway Systems / Engineering Design 5.03 Port and Waterway Systems / Cruise Terminal Design 5.05 Port and Waterway Systems /Cargo Terminal Design ' 5.08 Port and Waterway Systems / Marine Engineering Design 6.01 Water and Sanitary Sewer Systems / Water Distribution /San. Sewage Collection/ Transmission Systems t 6.02 Water and Sanitary Sewer Systems / Major Water and Sanitary Sewage Pumping Facilities 10.01 Environmental Engineering / Stormwater Drainage Design Engineering Services 11.00 General Structural Engineering 16.00 General Civil Engineering 17.00 Engineering Construction Management 21.00 Land Use Planning FLORIDA DEPARTMENT OF TRANSPORTATION 3.1 Minor Highway Design 3.2 Major Highway Design 7.1 Signing, Pavement Marking and Channelization 10.1 Roadway Construction Engineering Inspection 10.3 Construction Materials inspection e ' o Minority Business Enterprise (MBE), Florida o Small Business Enterprise, SFWMD o CBE, Miami -Dade County O o MBE, Miami -Dade County Public Schools o MBE, School Board of Broward County Inc. 500 America's Fastest - Growing Private Companies, Serralta Rebull Serig, Inc. was ranked #152 2003, 2006, 2008, 2011, & 2012 Top 100 Minority Businesses, Greater Miami Chamber of Commerce 2004, 2006, 2007, 2008, 2009 City of Hialeah Corporate Sponsorship Award Inc. 5.0� greater Miami `a chamber of �ce ss Fo ENGIN EERING,INC. O� SJNNY.1S4 �SB x r yF 9�• FL 0 0. C�rY ao Or SUN P V ■ J State �`of�F�torida UrFb,� Board,of Profssionol'Englneers >- •SR& Engigineering,.lnc. R �� �6 eaahMmd uadv dw peavbiom d Sum�L023: ibide Smvmr, re enn mrim'vq n:.im E.�d�rwrAete d�wrs a r,or�d r.�lnm. d_+r �r�d � a�r> of rF,.ao s� - .MiNS.Yn�I5J11r5 :Cc[Y.Z.. d•Aurhor m' u. - G31 State�Okffi orida Board,oF P_rofesslo(naL'£ngmeers IV �f•, �Arrivr ihoc° ��5 '• Ignauo�Serralta; PsE. Is licensed w o Profmio;ol near undac/7ropter 471, Florida Statutes C.p'v«'ee:221iar5 @'Y - �6� P.E Ii Nc A Hx 2=152 ma °' CUU w4-� sacs a -C1�'- v State�o_fF�t ©rida 1; y�u _ ;� r Board 6f Profe;siondUhgFneers �f�°i +RRAn u Iur .G.�Y _ °Olfveno Sancha P:Ey �� SFBP'yS' Is lirensed w o Profmfotwl SO M under Chapter 474 Florida Statures F,s:aeva+sa 4. State�`of�'�torida �i Boo rd ;of•P.rofts3io °nal:Engneers Lpxi�. Aar_sis that ��.,, VV Is licensed as a Profwioml rr u"rd.,eryQropter 471, Florida Statutes F.prsbe 25 - 'YC�r'- -_�f P.E Iic. Na 22JIMISllal5uite Wit'C =�_ �yyy State of Florida Department of State I certify from the remda ofdds olf that SRS ENGINEERING. INC, is a 14, 1"5. a rcM«Brai,x i ttSd ep uereva be r 1 L h 1995. oft6e Stae of rb+da filed w Sepemb Tbc draunwl numb of this mpuuiw u P950000]0)612. I fonber cenif-v that Wd coporuion hM paid au fm due dua oR duou;b D., b. 31, 2013, Out in rwc .1 mmml rg ont..if«m bsmen neon was rdcd on )nanny 23. 2013, ead in stuns u active. 1 fund« certify that said cosp«ation bus not filed Articles of D mottaiw. Gr. eL. q ✓NM r..asc.rye N n Tm.0 c gC An n fie rt�nwbN�mr. au Seeretfffy ojStnte mrm ta.. a.rs�ue aab•t ay�.s +�as�v.tiu,..sen �acund� 4 Stall or Florida Minont); 141omen & 0 Service- Dtsabled Veman !:.a ss�"� Htninm CertiFcation SRS Engineering, Inc. Is certified under the prorisiom of 287 and 293.187, Florida Statutes for a period frunl: OMM313 1a oao7n015 nondo UtPOnment of MeaJ9 MXmctl pmrPM}f.5«rtary Offl[eafSq'pae•0rerHy rd'v.p.^uurrr ..rvlStitFl Y�.o.IWwe .�sl Y.sII� WMI -DARE Miami -Dade County Internal Services Department Statement of Technical Certification Categories CATEGORY NO: CATEGORY DESCRIPTION APPROVAL DATE EXPIRATION DATE 3.01 HIGHWAY SYSTEMS - SITE DEVELOPMENT AND PARKING LOT DESIGN 8/8/2012 $131/2014 3.02 HIGHWAY SYSTEMS - HIGHWAY DESIGN INTIM12 8/31/2014 3.06 HIGHWAY SYSTEMS - TRAFFIC CALMING 6/8/2012 81312014 3.09 HIGHWAY SYSTEMS - SIGNING, PAVEMENT MARKING, AND CHANNELIZATION 8/6!2012 8/31/2014 4.01 AVIATION SYSTEMS - ENGINEERING DESIGN 81812012 8/31/2014 5.01 PORT AND WATERWAY SYSTEMS - ENGINEERING DESIGN 8/8/2012 8/31/2014 5.03 PORT AND WATERWAY SYSTEMS - CRUISE TERMINAL DESIGN 8/&2012 8/31/2014 5.05 PORT AND WATERWAY SYSTEMS- CARGO TERMINAL DESIGN 8/8!2012 8/31/2014 5.08 PORT AND WATERWAY SYSTEMS - MARINE ENGINEERING DESIGN 8162012 6/31/2014 6.01 WATER AND SANITARY SEWER SYSTEMS - WATER DISTRIBUTION AND SANITARY SEWAGE COLLECTION AND TRANSMISSION SYSTEMS 6182012 8/31/2014 6-02 WATER AND SANITARY SEWER SYSTEMS - MAJOR WATER AND SANITARY SEWAGE PUMPING FACILITIES 6182012 6/31/2014 10.01 ENVIRONMENTAL ENGINEERING - STORMWATER DRAINAGE DESIGN ENGINEERING SERVICES 8162012 8/312014 11.00 GENERAL STRUCTURAL ENGINEERING 8 /62012 8!31/2014 16.00 GENERAL CIVIL ENGINEERING 8 /82012 8/31/2014 17.00 ENGINEERING CONSTRUCTION MANAGEMENT 8162012 8/312014 21.00 LAND -USE PLANNING 6162012 8/312014 Lisa M. Millan, R. A., Chairperson Chief, Professional Services Division Internal Services Department r Florida Department of Transportation RICK SCOTT GOVEIL \OR Ignacio Serralta, President SRS ENGINEERING, INC. 5001 SW 74"' Court, Suite 201 Miami, Florida 33155 Dear Mr. Serralta: 60S Suwanncc S1=1 Tallahassee. PL 32399.0450 September 4, 2013 ASA\TII PRASAD, PJ- SECRE I AN Y The Florida Department of Transportation has reviewed your application for qualification package and determined that the data submitted is adequate to technically qualify your firm for the following types of work: Group 3 - Highway Design - Roadway 3.1 - Minor Highway Design 3.2 - Major Highway Design Group 7 - Traffic Operations Design 7.1 - Signing, Pavement Marking and Channelization Group 10 - Construction Engineering Inspection 10.1 - Roadway Construction Engineering Inspection 10.3 - Construction Materials Inspection Your firm is now technically qualified to do work for the Department for minor projects only. This level of qualification allows consultants to compete for minor projects with fees estimated at below $250,000.00. Your Notice of Qualification shall be valid for one year from the date of this letter. We will automatically notify your firm 45 to 60 days prior to your renewal deadline. If you have any questions, please don't hesitate to contact me by email at Cadiayn.Kell@dot.state.ft.us or by phone at 850 -414 -4597. Sincerely, /l;�Wo Carliayn Kell Professional Services Qualification Administrator State of Florida Department of State I certify from the records of this office that FANDREI CONSULTING. INC. is a corporation organized under the laws of the State of Florida; filed on August 1; 2005. The document number of this corporation is P05000107233. I further certify that said corporation has paid all fees due this office through December 31. 2014, that its most recent annual report/uniform business report was filed on February 26. 2014. and its status is active. I further certify that said corporation has not filed Articles of Dissolution. Given under nnv hand anti the Great Seal of the State of Florida at Tallahassee, the Capital, this the Ttvenq, -sixth dql• of February, 2014 ju Secretary of State To authenticate this certificate,visit the following site,enter this ID, and then follow the instructions displayed. hops: // exile .sunbiz.org /certauthver.httnl Stc B is authorized under the to the public through a Expiration: 2/28/2015 Audit No: 22820150383 Stat a 1 Is licensed as a Proi Expiration: 2/28/2015 Audit No: 228201524956 k •ida ers to offer engineering services )ter 471, Florida Statutes. CA Lic. No: 26574 fvm-Rlo rlda ..� c 'KyC[•7 o _essiona Engmeers Attestsi &2-.— 51 A t y r�3- C'6i iM5 d Fan'dr•,ef 14 E. rge'unde 'Chapter 471, Florida Statutes P.E. Lit. No: VIE 31478 MIAMI - DADE Miami -Dade County Internal Services Department Statement of Technical Certification Categories Firm: Fandrei Consulting, Inc. 12651 S. Dixie Hwy, Suite 333 Pinecrest, FL 33156 CATEGORY APPROVAL EXPIRATION NO: CATEGORY DESCRIPTION DATE DATE 1.01 TRANSPORTATION PLANNING - URBAN AREA AND REGIONAL 1012/2013 10/31/2015 TRANSPORTATION PLANNING 3.04 HIGHWAY SYSTEMS- TRAFFIC ENGINEERING STUDIES 10/2/2013 10/31/2015 3.05 HIGHWAY SYSTEMS - TRAFFIC COUNTS 10/2/2013 10/31/2015 3.06 HIGHWAY SYSTEMS - TRAFFIC CALMING 10/2/2013 10/31/2013 3.07 HIGHWAY SYSTEMS - TRAFFIC SIGNAL TIMING 10/2/2013 : 10131/2015 3.09 HIGHWAY SYSTEMS - SIGNING, PAVEMENT MARKING, AND 10/2/2013 10/31/2015 CHANNELIZATION t3.11 HIGHWAY SYSTEMS - SIGNALIZATION 102/2013 10/312015 O Lwsa M. Millan, -R. A., Chairperson Chief; .Professional Services Division latemal'Services Department ; 1 amee 1 � � oa3m � om000 Joao o aoo 0 0,00000© ..�t - r - _ Ct 6182125 f-i' Il STLTE OF FIDI�, State��i0o1!, .. lorida r� 'rem ` •_ • _ __ =s h �' 7 rm ®,xrsemae: ' } AMEC�En entA Infra W6cture Inc' yt,M,5 G c e ou,kri+d wdeF,k yrw¢ � ],IA� ro offer ei+g,cccri,g.cn'.cc • ' + ^�' 1 tr p�N _,I+.ev6h • R lmwd �� dwr I .d „de Q•p.er N4' ibrda ,A s - ur�r±a. Vdv N: -a 0liwn• CrtifiwteMr� 3 �_ 339 CERTIFICATE OF LIABILMY INSURANCE � - ....�.......�.. ._.,._.. .. .... is ._. ...,� .-..yam 1 1 1 Professional Licenses State'e "'; orida AV :: 4J 4 - -WrS Boord`g Wofes ;fondl Engineers ArrhbAiJOTJ Alvarez'Jrl „P.E. Is licensed as a Profasloral'Esrgtneer under.Chapter 471, Florida Statutes FxP'vnie> 22inons5 'L' -tea( .i �g•� I.E I:c Na Mdn Nz I38Ia1516x63 COD WE �� 58980 State -6oNWE -ii aorida Boa[d9of Professional Engtneers g a `Arms ndo tHe rno ndrzffi '���� Is licensed as a Professional' ngaeer.under Chapter 471, Florida Starutes t :p"vmvn LINAtl `1174. gw• p;;# Mik.N 6I212 Avea tier zzeta15109(z Sp?ciahlnspector .alitN 73WSOW State�s'01&.-Florida d $so-`. �-`.5.'+�yVj.E BOardfb Professional Engineers LAC 5.�el3'esu rhar st,,.° -1�F 2 a{Angela UAlba P E',s M�lir F'BFf�<�� Is licensed m a Profostonal' ngmeer.under.Chopter 471, Florida Statutes &,i.a zrsen6n '1'�•ti 'I }S{' '`^p' P.LI N Ad'v Ib. II6IDn9]66x "Wilm, State 1:04, Ryrida Board,bf Professional Engineers . Att atho Edilberto Abonce, P:E. • t I WE Is licensed m o Professlonal Ever under Chapter 471, Florida Statutes F:p,vlm: ta3m0f8 bClr l:s iN3a]53939a State &o�� ,4- F%1 °or der F , 'Board of'Professtono_hEngmeers” F,-- ./urav - Ricardo Eraxedo`a� - �!� Is licensed. aArSfenio al' necr,under Chapter 4711 Fbrrda StatutnI F:pirms,c >M/fla - N ` �&. � uwrpJsst ADD WE �•- "l - , 4la7 Statelod {Florida . Board +df.,P,rofesslonSGEngmeers Brlan'ScottT athaway -, P.E. 0 RL 1 Is licensed as a Professional gt�eer.undeoGhdpter, 471, Florido Stotuted Fap'vnion 72820[5 C�t�V9• AuLn nc II81018Ibu3 OD•. wlw x.6071«:, � State�ofFrlor.ida. Boa @@r�d)((6�1.._Pr']]o,fessional Engtneers' 7('exAbn 7sAa vino[ 15.1 -9F Is licensed as a Professional' n seer under Cho ter 471; Florida .EStates'• FsPimW 2182151 P.Enc Na Audh w: xxezosslnea], - CDD I{'f; 1'@ 757w- Professional Licenses MIAMI - DADE Miami -Dade County Internal Services Department Statement of Technical Certification Categories 1 _ - 1 Firm: AMEC ENVIRONMENT & INFRASTRUCTURE, INC. 5845 NW 158 Street Miami Lakes, FL 33014 CATEGORY APPROVAL EXPIRATION NO: CATEGORY DESCRIPTION DATE DATE 3.01 HIGHWAY SYSTEMS - SITE DEVELOPMENT AND PARKING LOT DESIGN 1/22/2014 1/31/2016 3.02 HIGHWAY SYSTEMS - HIGHWAY DESIGN 1/22/2014 1/31/2016 4.01 AVIATION SYSTEMS - ENGINEERING DESIGN 1/22/2014 1/31/2016 5.01 PORT AND WATERWAY SYSTEMS - ENGINEERING DESIGN 1/22/2014 113112016 5.09 PORT AND WATERWAY SYSTEMS - ENVIRONMENTAL DESIGN 1/22/2014 1/31/2016 6.01 WATER AND SANITARY SEWER SYSTEMS - WATER DISTRIBUTION AND. 1122/2014 1131/2016 SANITARY SEWAGE COLLECTION AND TRANSMISSION SYSTEMS 6.03 WATER AND SANITARY SEWER SYSTEMS -WATER AND SANITARY 1/22/2014 1/31/2016 1 SEWAGE TREATMENT PLANTS 8.00 TELECOMMUNICATION SYSTEMS 1/22/2014 1/31/2016 1 9.01 SOILS, FOUNDATIONS AND MATERIALS TESTING - DRILLING, 1/22/2014 1131/2016 SUBSURFACE INVESTIGATIONS AND SEISMOGRAPHIC SERVICES 9.02 SOILS, FOUNDATIONS AND MATERIALS TESTING - GEOTECHNICAL AND 1122/2014 1/31/2016 ' MATERIALS ENGINEERING SERVICES 9.03 SOILS, FOUNDATIONS AND MATERIALS TESTING - CONCRETE AND 1/22/2014 1/31/2016 - ASPHALTTESTING `SERVICES- - 'T' -- -- 9.04 SOILS, FOUNDATIONS AND MATERIALS TESTING - NON - DESTRUCTIVE 1/22/2014 1/31/2016 TESTING AND INSPECTIONS 9.05 SOILS, FOUNDATIONS AND MATERIALS TESTING - ROOF TESTING AND 112212014 1/31/2016 CONSULTING 9.06 SOILS, FOUNDATIONS AND MATERIALS TESTING - MATERIALS TESTING / 1/22/2014 1/31/2016 1 CONSULTING /TRAINING Luisa M. Milian, R. A., Chairperson Chief, Professional Services Division 1 Internal Services Department ' ananu - �AOE . Miami -Dade County Internal Services Department Statement of Technical Certification Categories Firm: AMEC ENVIRONMENT & INFRASTRUCTURE, INC. 5845 NW 158 Street Miami Lakes, FL 33014 CATEGORY N0: CATEGORY DESCRIPTION APPROVAL DATE EXPIRATION DATE 10.01 ENVIRONMENTAL ENGINEERING - STORMWATER DRAINAGE DESIGN ENGINEERING SERVICES 1122/2014 1/31/2016 10.02 ENVIRONMENTAL ENGINEERING - GEOLOGY SERVICES 1%22/2014 1/31/2016 -19.03 ENVIRONMENTAL ENGINEERING - BIOLOGY SERVICES 1/22/2014 1/31/2016 10.04 ENVIRONMENTAL ENGINEERING - CHEMISTRY SERVICES 1/22/2014 1/31/2016 10.05 ENVIRONMENTAL ENGINEERING - CONTAMINATION ASSESSMENT AND MONITORING 1/22/2014 1/31/2016 10.06 ENVIRONMENTAL ENGINEERING - REMEDIAL ACTION PLAN DESIGN 1122/2014 1/31/2016 10.07 ENVIRONMENTAL ENGINEERING - REMEDIAL ACTION PLAN IMPLEMENTATION / OPERATION / MAINTENANCE 1/22/2014 1/31/2016 10.09 ENVIRONMENTAL ENGINEERING - WELLFIELD, GROUNDWATER, AND SURFACE WATER PROTECTION AND MANAGEMENT 1122/2014 1/31/2016 11.00 GENERAL STRUCTURAL ENGINEERING 1122/2014 1/31/2016 112.00 GENERAL MECHANICAL ENGINEERING 1/22/2014 1/31/2016 13.00 GENERAL ELECTRICAL ENGINEERING 1/2212014 1/3112016 14.00 ARCHITECTURE 1/2212014 1131/2016 15.01 SURVEYING AND MAPPING - LAND SURVEYING 11=014 1/31/2016 15:03 UNDERGROUND UTILITY LOCATION 1/2212014 1/31/2016 15.04 HYDROGRAPHIC SURVEYS 1/22/2014 1/31/2016 16.00 GENERAL CIVIL ENGINEERING 1/22/2014 1/31/2016 17.00 ENGINEERING CONSTRUCTION MANAGEMENT 1/22/2014 1/31/2016 p� Luisa M. Millan, R. A., Chairperson Chief, Professional Services Division Internal Services Department Florida Depart nRmof .Agrictdwrn and.Cans rServices Dilisao or C.m ,Sertices License No.:-LB7097 Board or Professional Sumeyom and Mappers Expiration Date: February 28, 2013 2005 Apalacbee Plxay Tallahame, Florida 32399 -6500 'q S Professional Surveyor and Mapper Business License Under the provisions of Chapter 472. Florida Statutes HADONNTE CORP 1985 PIW 88TH CT STE 202 DORAL, FL 33172.2638 ADAM H. PUrlWAM CODIM1551ONER OF AGRICULTURE tl�u..rnrnw.R.� car s.i.t<n pMdm N('oe®utu.tm lii� \o0. ls6006 _ _ _. amael MaJml$p,elmsa�a \Si'WS � -Egyyu DUe'FLnvry f$]IIS SOC Ar�deeM er TVlNUae.ibile J2)99i500 Professional Surveyar and Mapper Incense UM lac1eo.%iomo(Chy OT F S ABG11AM HADAD IIADO\A'E CORPIMNIV UrI}I COUMUM 202 WRAI -M D172 C pi ADAM R KLT LQV IMSM\ OF AGRICL n*F Ir.smq Ynpr6d�.ep �Iqp wve WJd�wa4eY�aTdMtl.P eR 1Y f® fbiN aepe®INAiaudlvrt WC Win Oi.iamMCo�Wiae Iiame AO:I 16b99 -_ — -omaw Mena wens. ue M.ppen E.prmm Does. r^xbnm� 2£.2 " SOOT Aphdrt R•al TAAme. Flade t_MfiVO Professlonal Surveyor and Mapper Incense ume mr � 'aims ortagun2. nme, sus RAUL DE JF-S UQUIERDO MI." srltl LT SIS 202 DDR -kt-M JJ172- W ADAM RP " cownslosmaFAwlainu F1wYb BeVeaem YApkdme m1 C—Sv.ts _ 0 _- BvN.t Mn T COne7v.esi Metro, a, y�y wt:- Wwe)20.211s AM A rk. pl�e q T� FtrI6 � Professional Surveyor and Mapper Dcease uma w wP -� wcx,pa+r, aew suev�, JOSESENAS lw %li aSlll Cr STE 202 /1✓ DORAErl. 11172- U C AeAM H PU!\.W S'OY?aSSIOI'FJl (P A W CLtNItE Sb.umn wnPa�'d�R �e4F•aa �aeu.e Y.eweasa.Rd�]4e �-_!W � LAND SURVEYORS H A DO N N E MAPPERS GPS SERVICES MIAMI - CADE Miami -Dade County Internal Services Department Statement of Technical Certification Categories Firm: HADONNE CORP. 1995 NW 88th Court, Suite # 202 Doral, FL 33126 CATEGORY APPROVAL EXPIRATION NO: CATEGORY DESCRIPTION. DATE DATE 15.01 SURVEYING AND MAPPING -LAND SURVEYING 1215!2012 1/31/2015 15.03 UNDERGROUND UTILITY LOCATION 12/5/2012 1/31/2015 1 Luisa M. Millen, R. A., Chairperson Chief, Professional Services Division Internal Services Department 7 O � yF '' • F L C'TY OF SUN Aa0 C O w+ E L O L m lJ N L G s ame.r.00 Firm Overview AMEC's Florida operation employs more than 500 people in offices located in every region of the state, including more than 100 in South Florida. We can draw on our experienced local managers and geographical reach to support the needs of clients, regardless of project size and 1 complexity. AMEC's depth of global resources allows us to provide our clients with innovative solutions engineered and priced to fit perfectly with local challenges. In Miami -Dade County, AMEC is located at 5845 NW 158"' Street, Miami Lakes, Florida 33014. Our South Florida offices have provided professional services to the area for more than four decades. What separates AMEC from other firms is our proactive approach to project and client care. We have a comprehensive program that brings creative solutions to complex challenges as our professionals proactively engage in activities that ensure project success. This is evidenced by numerous client relationships that are decades old. The strength and longevity of these relationships are testament to our commitment to understanding our client's needs, to being promptly available when they need us, to delivering creative value -added solutions and then measuring our own performance relative to the success of our clients. Geotechnical Engineering During the last 30 years, AMEC has provided geotechnical engineering services for various public agencies, organizations, and federal, state and regional governments, as well as industrial and private clients. AMEC's geotechnical group is supported by a host of well qualified geotechnical engineers, geologists, and technicians. Since AMEC is comprised of a team of multidisciplinary engineers and scientists, we have the ability to develop creative solutions to complex geotechnical situations in addition to completing more traditional geotechnical services. AMEC's geotechnical engineering group is supported by a host of well qualified engineers, geologists, modelers, and technicians. Our geotechnical background encompasses all aspects and phases of a project from feasibility through project implementation. Our integrated team of professionals provides exploration, analysis, and design related to soil, rock, and groundwater as an essential part of most projects. Understanding the engineering behavior of soil and rock is what our geotechnical engineers do best; issues of strength, stability, and durability are assessed, designed, and managed. AMEC has significant and relevant project experience providing quality geotechnical and materials testing services for various local municipalities and state and federal agencies that include but not limited to Miami -Dade County Public Works Departments, the City of West Palm Beach, School Districts of Palm Beach, Broward, and Miami -Dade Counties, the Florida Department of Transportation (FDOT) D4 /D6, Florida's Turnpike Enterprise, South Florida Water Management District (SFWMD), Broward County Aviation Department (BCAD), Florida East Coast (FEC) Railway, Tri -Rail Commuter Rail, and Fort Lauderdale Port Authority, along with various design -build projects which include Jewfish Creek Bridge, NW 5th Street Bridge, 1- 395, and the 1 -595 Corridor Improvement Program. Environmental and Ecological Services AMEC's professional engineers are experienced in the broad discipline of environmental engineering and ecological services. We provide environmental engineering design, environmental site assessments, hazard assessments, and remediation and mitigation strategies and plans for clients on a regular basis. AMEC also hosts a team of biological and ecological experts, including wetland scientists, environmental scientists, biologists, geologists, restoration ecologists, and water resources and environmental engineers who can perform services such as water quality assessment and monitoring, wetlands surveys, and biological and ecological studies that are required in environmental engineering project activities. For nearly 30 years, AMEC has been instrumental in the completion of successful environmental permitting and compliance projects for commercial, industrial, municipal, and County clients. AMEC's staff of geologists, environmental scientists, and engineers has acquired the experience to guide the regulated community through the myriad and mazes of the ever changing environmental regulations. Materials Engineering AMEC's materials engineering team has provided construction engineering and inspection (CEI), construction materials testing (CMT), and construction management (CM) services on a wide variety of highway, bridge, and airport projects throughout South Florida. Our staff coordinates work site activities to ensure the protection of human health and the environment; the prevention of damage to property, utilities, materials, supplies, and equipment; and the avoidance of work interruptions. This coordination is through various office /departments of applicable existing base or area operations including providing physical security to the work area with security equipment and personnel. AMEC offers a broad range of CEI services to assure the quality of our clients' construction projects. Our construction professionals have up -to -date accreditation and certification, and we maintain an in -house QA/QC laboratory equipment calibration program. AMEC has provided CM and CMT services to county, state and federal governments in the construction of roads, bridges and support structures as well as buildings, stadiums, exhibit halls and municipal facilities. Services include concrete testing, steel reinforcement inspection and testing, steel precast (architectural), precast inspection (structural), foundation inspection, soils testing, and testing/ inspection of masonry, fireproofing, waterproofing, roofing, and bituminous materials. AM a-1-HADONNE 0 OUR CORE SERVICES . LAND SURVEYORS AND ).ZAPPERS • 30 LASER SCANNING • UTILITY COORDINATION • SUBSURFACE UTILITY ENGINEERING CERTIFICATIONS WAN DADE COUNTY USE (FLORIDA) CBE LDB MICRO $BE 15.01 (SURVEY) 15.03 (S.U.E.) FOOT 8.1 CONTROL SURVEYING 8.2 DESIGN ROW 8 CONSTRUCTION 8.4 ROW MAPPING MDX LB ONTACT US 9 a TION HADONNE was established in Miami -Dade County in 2001. Since commencement, the firm has diligently worked to meet the needs of both our private and public sector clients. HADONNE special- izes in providing Surveying and Mapping, Utility Coordination and Sub - Surface Utility Engineering (S.U.E.). Over the past decade HADONNE has earned the respect of our peers by striving for ex- cellence on every project while navigating steady growth. We are proud of the fact that we provided our clients with personalized services. Our Principals and Project Managers are directly involved from the initial phase of each and every project all through its completion. HADONNE has assembled a team of experienced professionals trained to perform a variety of unique work tasks needed to successfully complete projects. Our staff has the capability to meet the needs and demands of the various types of clients including, Florida Department of Transportation, counties, municipalities, and private clients. In addition, HADONNE services are tailored to meet the needs of Land Developers, Engineering Consultants, General Contractors and government agencies. HADONNE's success is simply based on the hands -on approach taken by its Principles and Associ- ates together with the integration of disciplines and successful delivery of solutions. In addition, all projects are subjected to our rigorous in -house Quality Assurance / Quality Control Program that spans the life of each project. It is this constant attention to client and project requirements that has resulted in HADONNE's proven track record of consistent on -time and on- budget performance. 85 NW 0h Coup, Suite 202 I Daral, Florida 33172 Our philosophy is to create, as well as maintain, a professional attentive relationship with our clients, *1(305)266 -1183 focusing equally on their needs together with the project's solutions. HADONNE is committed to *1(305)207 -6845 providing excellent professional service leading to overall solutions for our clients. The result of this vnru.hadome.m commitment is proven; over 90% of our workload is from repeat business and clients. '� - 1(305)266 -7788 ®www.hadonne.com O IHADONNE ING AND, MAPPING GENERAL SURVEYING SERVICES ALTA / ACSM BOUNDARY SURVEYS AS -BUILT SURVEYS BOUNDARY SURVEYS ROUTE SURVEYS SKETCH TO ACCOMPANY LEGAL DESCRIPTIONS . TOPOGRAPHIC SURVEYS MIAMI -DADE WATER AND SEWER . SEWER AS-BUILT SURVEY STORMWATER INVENTORY AND MAPPING SUBSURFACE UTILITY ENGINEERING WATER AS- BUILT SURVEY MISCELLANEOUS AND GIS SERVICES CAD TO GIS MIGRATION CONDOMINIUM SURVEYS CONTROL FOR AERIAL SURVEYS DIGITAL DATA MIGRATION DOCUMENT SCANNING 8 DATA CONVERSION EARTHWORK VOLUMES CALCULATIONS EXPERT WITNESS I LAND DISPUTE FEMA FLOOD ELEVATION CERTIFICATE GIS DATABASE DESIGN GIS MAPPING ,. GPS DATA POST-PROCESSING GPS FIELD DATA COLLECTION HIGH DEFINITION 3D LASER SURVEYS HYDROGRAPHICIBATHYMETRIC SURVEYS TRAFFIC SIGNAL INVENTORY MAPPING TREE INVENTORY AND MAPPING UTILITY INVENTORY AND MAPPING VEGETATION MAPPING -LORIDA DEPARTMENT OF TRANSPORTATION BRIDGE DETAIL SURVEYS CHANNEL SURVEYS DRAINAGE SURVEY CONTROL FOR AERIAL PHOTOGRAMMETRIC HORIZONTAL & VERTICAL CONTROL MISCELLANEOUS FOOT SURVEYS PROJECT NETWORK CONTROL SURVEYS (FDOT) RIGHT OF WAY MAINTENANCE MAPS RIGHT OF WAY SURVEY MAPS ROAD AND DRAINAGE DESIGN SURVEYS TOPOGRAPHIC / DTM DESIGN SURVEYS WATER BOUNDARY SURVEYS 3D LASER SCANNING _AND DEVELOPMENT COORDINATION WITH UTILITY COMPANIES FINAL PLATS PRELIMINARY LAND ACQUISITION INSPECTION SUBDIVISION LAYOUT DESIGN SUBDIVISION PLATTING TENTATIVE PLATS WAIVER OF PLATS PREPARATION OF SPECIAL TAXING PETITION , ONSTRUCTION SURVEYING SERVICES BUILDING CONTROL AND LAYOUT CONSTRUCTION SURVEYS FOR BUILDING CONSTRUCTION SURVEYS FOR ROAD WAY PILE LAYOUT PLOT PLANS SITEWORK LAYOUT SUBSURFACE urvey Group: HADONNE has four (4) registered surveyors Ion staff and runs (5) survey field I \ crews daily. HADONNE also offers 11iJ `Subsurface Utility Engineering (S.U.E.) and Utility Coordination as its core services. We have valuable experience working as a Sub - Consultant for the last twelve (12) years and we are very familiar with the District's survey staff and methodologies. Our office is located just five minutes away from the District's once and is designated as a Disadvantaged Business En- terprise (DBE). rganization and QA 1 OC Procedures: The following is a synopsis of our project approach for our Quality Assurance I Quality Control Plan. Our organizational chart illustrates the responsibilities of the personnel to be assigned to each task, along with the reporting relationships between them. As an inno- vative Surveying and Mapping firm, we bring an orga- nized management approach to this contract. Our high standards are maintained through a practical and effective project management program that includes the following Quality Assurance and Quality Control processes. coding Principles: The OA I OC program's ob- jective is to provide surveying and mapping re- sults, based on sound principles and practices. These principles and practices are based on the highest standards to ensure that the final work produced ad- dresses the scope of services and has been reviewed every step of the process. The program is based on the following four key principles: Retailed Approach: Quality is achieved by having detailed planning, coordination, supervision and direction. onstant Project Supervision: Quality is con- trolled through daily checking and reviewing of the companies activities by each designated staff. Rormal QA 1 QC Evaluations: Quality is verified by aving the Manager perform formal OA/QC of the processes of the performed work at regular designated intervals. Active Principal Participation and Oversight: Quality is assured through hands on oversight and independent reviews by the Principals, of the overall processes, at regular intervals. By emphasizing safety and technical training with all our survey staff, we instill a work ethic that promotes personal responsibility and the aspiration to perform quality work. It is through this multi4ayer approach that, HADONNE can guarantee prompt, professional service on survey tasks assigned to our firm. nnovation: Over the years we have developed a reputation of being innovators, receiving positive feedbacks every time we have proposed the use of new technology. For example, we combined using GPS, TDS Data Collectors, Ground Penetrating Radar (GPR) and 3D Laser Scanners (High Definition Sur- veys) on a project. The Final Deliverable included: underground utility lines in 3D together with the Topo and OTM. This enabled the Client to accurately Design eliminating future construcfion conflicts. At HADONNE PERS we are constantly researching new efficient and accu- rate methods of surveying the above ground and un- derground conditions, all in the pursuit of the ultimate deliverable, a '3D Virtual Representation of the existing conditions`. Land Development: Over the past 12 years HADONNE has successfully recorded over 50 plats; for residential, commercial, and government agencies. Our staff includes several Land Platting experts. We have assisted a number of our Developer Clients with A to Z services; from the inspection peri- od, land acquisition process, coordination of utility availability, ALTA I ACSM Land Title Surveys for real estate closings, Site Plan preparation working in con- junction with the Architect and Engineer, Special Tax- ing Petition Filing, CDD filing, Tentative / Preliminary Plat Preparation and Expedi ing, and lastly, Final Plat preparation expediting and recording. HADONNE is a well -known firm within the Miami -Dade County Land Development Section; we encourage you to contact any member of their staff for reference. We have developed a very close relationship with all mem- bers of Miami -Dade Counyt s Plat Committee, these relationships have taken time to establish and our ability to work with these individuals on a consistent basis encouraged an open line of communication. HADONNE currently serves as the City Surveyor for the Town of Medley, City of Doral, Village of Pinecresl, and Town of Cutler Bay. One of our duties is to review all Tentative Plats, Final Plats, and Waiver of Plats; in addifion, we have also completed Plats for the City of Doral as well as the Town of Cutler Bay. HADONNE has developed an internal tracking system that allows our Project Surveyor to know with certainty the status of the Plat Review and Approval Process at any given moment. This allows us to keep our client up to date on the Plat timeline and process. Below are some of the plats we have successful rec- orded: , Doral Grande: PB. 169, P. 63 , Donal Public Works Facility: PB. 169, P. 42 –> Florida Memorial University: PB. 169, P. 10 — Garsh Development Park: PB. 168, P. 9 –, Tamiami Petro: PB. 167, P. 69 –, Hemingway Point: PB. 169, P. 46 — Jackson South Comm. Hospital: PB. 169, P. 15 –r Carlos & Carlos Industrial Park: PB. 163, P. 99 –, European Industrial Park: PB. 164, P. 3 ommilmenl to the client: It is our goal to not only work with the Client, but to work seamlessly, combining both HADONNE's and the Designing Con- sultant's knowledge, experience, ideas and tech- niques, so as to obtain a product that meets and ex- ceeds all expectations and requirements. HADONNE clearly has the experience, technology, and ability to tackle any task that this contract may present. We bring experience and technology to create innovative, yet proven techniques that work for FDOT. HADONNE is eager to commit the time, services and labor for the entire duration of this contract. We look forward to the opportunity to take on this contract and work alongside the Owner and the Design Consultant. X1(305)266 -1188 ®wuw.hadonne.mm O IHADONNE I UTILI NATION EFFECTIVE UTILITY COORDINATION PROCESS INITIAL INVESTIGATION PROCESS: COMPLIANCE WITH LOCAL AUTHORITY PROCE- DURES PERMITTING REVIEW NOTIFICATION OF ALL AF FECTED UTILITIES SCHEDULING REVIEW QUALITY CONTROL REVIEW OBTAINING UTILITY AS- BUILTS RESEARCHING GOVERNMENT PERMIT FILES CONDUCTING FIELD REVIEWS DETAILED COORDI- NATION PROCESS DETAILED COORDINATION PROCESS : GROUP UTILITY MEETINGS ACCORDING TO PLAN PHASE PAGE -BY -PAGE PLAN REVIEW AT MEETINGS DETERMINATION OF REIMBURSEMENT TO UTILITIES REVIEW OF UTILITY, RELOCATION PLANS AND ESTI- MATES PROCESSINGIREVIEW AGREEMENTS DESIGN ADJUSTMENTS TO REDUCE UTILITY RELO- CATION AND PROJECT CONSTRUCTION TIME MEETINGS WITH RAILROAD COMPANIES WRITE AND REVIEW UTILITY CONTRACT SPECIAL PROVISIONS CONFLICT ANALYSIS AND DEVELOPMENT OF CON- FLICT MATRIX UTILITY CONS T RUCTABILITY REVIEW ONE -ON -0NE MEETINGS WITH UTILITY OWNERS RECOMMENDATION OF SUE QUALITY LEVELS ASSISTANCE TO CLIENT WITH PROJECT PAPER- WORK REVIEW OF EXISTING PERMITS OR ISSUE NEW PER- MITS FOR PROPOSED RELOCATION WORK MEETINGS WITH ROW AND CONSTRUCTION DE- PARTMENTS UTILITY CONSTRUCTABILITY REVIEW FINAL UTILITY CERTIFICATIONS POST- DESIGN FOL- LOW UP FOLLOW -UP: SHOP DRAWING REVIEWS AS -BUILT REVIEWS CONSTRUCTION MEETINGS CLAIM SETTLEMENT EXPERT WITNESS UTILITY PLACEMENT INSPECTION LANDSURVE\0RS AND MAPPERS 3DILASER SCANNING / UTILIT\C00RDINAT10N l SUBSURFACE UTILITY ENGINEERING MTILITY RELATED CONFLICTS ARE A MAJOR ® esign Build Packages: Design\ ild is one CAUSE OF DELAYS AND CLAIMS DURING area where utility information is often lacking. ROADWAY CONSTRUCTION. Every type of new HADONNE can assist the Department in gathering project, from major reconstruction to minor projects, requires a meticulous awareness of the utility sys- the utility information required for the Design and s term already in place and, all too often, in the way of Construction Criteria Package. The package should proposed improvements. HADONNE delivers a dis- W identify wanting to enter into a Utility Work ork by Highway Contractor (UWHC) Agreement Gott service that focuses on minimizing impacts to utilities, thus reducing project delays. Our Utility Coordination Team is made up of individuals with an extensive knowledge and experience of FDOT, local, county and city government's standards and proce- dures and well as the norms and practices of the Utility Industry. This past experience has given us an inside knowledge of the utility industrys needs and shortfalls and the important role that Utility Coordina- tion plays on the design and construction of FDOT's projects. rtw, Dp ..r«T...y.. 2010 UAM UtMry Accommodation f a wl r ,.r Q t a noamamy As Utility Consultants, the HADONNE Team may be and state d the UAOs are eligible for reimbursement called upon to perform various roles that we are fully including a cost estimate of the relocation efforts. This prepared to undertake: information will aid the DBFs in submitting more aocu- upporting Internal Design: We are prepared to rate proposals and minimize or possibly eliminate provide coordination efforts on several internal claims associated with utility relocations. design projects concurrently through the use of multi- roject Development & Environment: During ple teams with our PM oversight. Our extensive and PD &E studies, the conceptual plans are submit - varied experience coupled with our knowledge and ted to the DUO for their preparation of a comprehen- familiarity of the department's policies and proce- sive Utility Assessment Package. Through coordi- dures makes us an ideal candidate to perform in this nation with the UAOs, the Hadonne Team would capacity, deliver to the PD &E Project Manager marked plans upporting Consultant Design: There may be shoving the locations of all existing and proposed times when the District Utility Office (DUO) re- utilities. If UAOs quality for reimbursement, a Utility quires our assistance with utility coordination (when a Cost estimate for relocation is also prepared for each consultant is performing the design). We can utilize alternative under consideration. our knowledge base to aid the DUO in the following —�I le— s way Performing QA/OC on utility documents submitted by consultants. o Assisting the DUO in finalizing internal Utility Doc - umems (for example, assembling Utility Docu- ments for Federal approval on Compensable interest projects). � Attending meetings on behalf of the DUO. o Providing guidance to utility consultants on exist- ing contracts. - 1(305)266 -Ita8 w Jiadonne.aom O IHADONNE UTILITY ENGINEERING SUBSURFACE UTILITY ENGINEERING SERVICES 3D UTILITY MAPPING AIR VACUUM EXCAVATION (TEST HOLES) CAD TO GIS MIGRATION CONCRETE SCANNING DIGITAL DATA MIGRATION GIS DATABASE DESIGN GIS MAPPING OF UNDERGROUND UTILITIES GPS FIELD DATA COLLECTION GROUND PENETRATING RADAR (G.P.R.) PRIVATE UTILITY LOCATES STORMWATER INVENTORY AND MAPPING UNDERGROUND VOID MAPPING UTILITY COORDINATION UTILITY DESIGNATING UTILITY INVENTORY AND MAPPING WATER AND SEWER AS -BUILT SURVEY LAND sURVEI\ORS AND MAPPERS 30XLASER SCANNING / UTILITY\COORDINATION / SUBSURFACE UTILITY ENGINEERING SUBSURFACE UTILITY ENGINEERING The detail surface and subsurface mapping of utili- ties during the planning and design phase of a transportation project will result in significant time and cost savings during construction. HADONNE offers a full range of Subsurface Utility Engineering services to both public and private clients throughout South Florida. Our staff of professional utility locators, surveyors and utility - coordinator has the expertise •�A— trequire to deliv- _ ­� --�­ eyed accurate -- Iutilily infor- mation needed by clients, engineers, contractors and designers to make informed project decision. HADONNE utilizes the latest state -of -the -art vacu- um excavation land survey data collection technology to obtain the exact horizontal and vertical location of existing utilities in conflict with proposed infrastructure To better match subsurface utility engineering ser- vices to the needs of a particular project, the Amen - can Society of Civil Engineers produced accepted guidelines for the collection and depiction of existing subsurface utility data (ASCE 38 -02). In this report, the ACE set forth four levels of quality per- taining to the StJi1 methods, inter- pretation and precision of subsurface utility data collected. These Quality Levels serve as a guide for engineers to detemune the level of detail they re- quire to reap the most benefit from subsurface utility engineering services. HADONNE offers services at all four quality levels. Our services can be tailored to you project needs, budget and schedule based on these guidelines. Quality Level A - Utility Designating and Locating: This service is typically performed during the design and construction phases. Precise horizontal and vertical location of utilities obtained by precise measurements of exposed structures at given points. The results surveyed and can be mapped onto plan documents. This is the most precise level of service, offering the most Complete, reliable data available. Quality Level B - Utility Designating: This service is recommended during early design stages and in areas where uulity records are gener- _ ,� • ally unavailable of - -t reliable. Subsurface utility data is obtained • .. � through geophysical methods to identify the existence and approximate horizontal position of the structures. Quality Level C - Visible Utility Features: This service is recommended during project plan- ning stages to aid site layout decisions. Approximate utility locations are estimated using surveys and plots of visible above ground utility features. These observations are correlated to existing utility rec- ords. Quality Level D - Utility Records Review: This service is recommended for feasibility studies during the pre-design stage to help identify potential costly utility relocations. Information on subsurface utility structures is based solely on a thorough records research and review. Ground Penetrating Radar - Recognized as one of the most powerful remote sensing instruments available, ground penetrating radar (GPR) is a safe, non - invasive geophysical invesNa- lion method for 'looking' underground to image subsurface features. GPR detects metallic and non- metallic, natural and man -made underground fea- tures, including: utilities, storage tanks, rebar, water tables. H.ADONNE's survey crews are trained in the use and operation of the latest GPR data collection equipment and technology. Geographic Information Systems - GIS is a computer -based system capable of assem- bling, stomp, manipulating, analyzing, managing and displaying both spatial (geographic or land referenced) and non - spatial (tune referenced) infor- mation. HADONNE's GIS consultants are highly experience in data integration and evaluation, and providing costeliecuve, highly accurate GIS solu firms to meet data management needs. '21(305)2664188 ®www.hadonne.com OIHADONNE V%4NY Q s a • r tiF 99�• FLO0.�O r C /TY OF SUN Pao ♦W' V ■ LM W CL x LLI A+ s♦ W RELEVANT EXPERIENCE PROJECT NAME: CLIENT'S NAME: TYPE OF FACILITY OR SERVICES: SRS PROJECT FEE: COMPLETION DATE: KEY INDIVIDUALS INVOLVED: Drainage Systems Arch Creek Drainage Improvements, Phase I, II, & III Miami -Dade County Department of Environmental Resources Management Civil Engineering Design of Area wide drainage Improvements N/A 1997 Ignacio Serralta, P.E. Jean - Claude Fontaneau Ramon Lopez PROJECT DESCRIPTION: Project Manager for design of the Arch Creek Drainage Improvement Project involving the design of the interconnected storm drain system with exfiltration trenches draining an area over 120 acres. The project also included design of a large stormwater pump station with backup generator, wetland retention pond, trash rack 1 structure, several water control drainage structures, canal outlet, and an interconnected pressure drainage well system. Note This Project was designed by CAS Engineering with key Individuals (PM, Design Engineers) currently employed by SRS Engineering, Inc. � 0 ']F= ENGINEE RINGING. RELEVANT EXPERIENCE PROJECT NAME: Drainage Systems Biscayne Gardens Drainage Improvements, Phase I, II, & III CLIENT'S NAME: Miami -Dade County Department of Environmental Resources Management TYPE OF FACILITY Civil Engineering Design OR SERVICES: of Area wide drainage Improvements CONSTRUCTION $$3,430,000 COST: COMPLETION DATE: 1998 KEY INDIVIDUALS Ignacio Serralta, P.E. INVOLVED: Jean - Claude Fontaneau Ramon Lopez PROJECT DESCRIPTION: Project Manager and Chief Design Engineer -In- Charge for preparation of construction documents involving the design of drainage improvements over an area of 467 acres including the construction of a 15,000 g.p.m. pump station with backup generator building, trash rack structure, two canal outlets, and a storm drain system consisting of over 14,500 linear feet of 15" to 66" drainage mainline pipe and 15,500 linear feet of exflitration trenches. Note This Project was designed by CAS Engineering with key Individuals (PM, Design Engineers) currently employed by SRS Engineering, Inc. A� b i Y I RELEVANT EXPERIENCE PROJECT NAME: CLIENT'S NAME: TYPE OF FACILITY OR SERVICES: SRS PROJECT FEE: COMPLETION DATE: A.D. Barnes Park New Walkways and Parking Lot Miami -Dade County Park & Recreation Department Mr. Pedro Nunez Linear Park with Walkways and Parking Lot. $16,813 January 2007 KEY INDIVIDUALS Ignacio Serralta, P.E. INVOLVED: Jean - Claude Fontaneau 7:ti31 tali i 03 *347:71i111 to] IF SRS provided the engineering design, permitting and construction phase services of a walkway and bike path and parking lot. The project is located within A.D. Barnes Park along the Coral Gables Canal. The work included the geometric design of the walkways /bike paths and parking lot, design site paving, grading, and drainage plans. Coordinating the work of subconsultants including Surveyors, Geotechnical, electrical site lighting and Landscaping. Our scope of work also included preparing and submitting permit applications and construction plans for "dry-run" and "final" review by local regulatory agencies including Miami -Dade County Building Department, Miami -Dade Public Works Dept., and DERM. Construction Phase services included weekly construction meetings, reviewing shop drawings, responding to RFI's, providing periodic construction observations, and preparing close- out documents. ti 1 riN f�li f_i�l IIII .rte 41 S tr g Ali Ise '.�_ \\� 's"• y�. r �E A-`y� r_c7 7t t� h� ENGINEERING.INC. �y RELEVANT EXPERIENCE PROJECT NAME: Chapman Field Park New Pedestrian /Bike Paths and Parking Lot CLIENT'S NAME: Miami -Dade County Park & Rec. Depart Ms. Lydia Salas 305 - 755 -5456 TYPE OF FACILITY Pedestrian /Bike Path, OR SERVICES: Access Road, Canoe Ramp, and Parking Lot SRS PROJECT FEE: 555,818 CONSTRUCTION COST: $1,610,000 COMPLETION DATE: September 2011 KEY INDIVIDUALS Ignacio Serralta, P.E. INVOLVED: Oliverio Sanchez, P.E. Jean - Claude Fontaneau PROJECT DESCRIPTION: SRS provided the engineering design, permitting and construction phase services of a pedestrian /bike path, access road, parking area, and canoe ramp. The work included the geometric design of the pedestrian /bike paths and parking lot, design site paving, grading, and drainage plans. Work within a previous landfill site and contaminated soils. Coordinating the work with other subconsultants including Surveyors, Geotechnical, Structural Engineers and environmental consultants. Our scope of work also included preparing and submitting permit applications and construction plans for "dry-run" and "final" review by local regulatory agencies including Miami -Dade County Building Department, Miami -Dade Public Works Dept., and DERM (Class I, IV, & VI); as well as, Environment Resources Permit (ERP) for costal construction and impacts to wetlands and mangroves. Construction Phase services included weekly construction meetings, reviewing shop drawings, responding to RFI's, providing on -site daily construction observations, and preparing close- out documents. 1�uf ENGINEERING�INC. RELEVANT EXPERIENCE PROJECT NAME: FEMA /DORM CLIENT'S NAME: Miami -Dade County DERM Mr. Dorian Valdes TYPE OF FACILITY FEMA /DORM Project OR SERVICES: Master Consultant SRS PROJECT FEE: $4,500,000 COMPLETION DATE: December 2005 KEY INDIVIDUALS Ignacio Serralta, P.E. INVOLVED: Oliverio Sanchez, P.E. PROJECT DESCRIPTION: SRS has performed as a Master Consultant for this FEMA /DORM program since November of 2001. The FEMA /DORM project is a jointly funded effort supported by the Federal Government, State of Florida, and Miami -Dade County intended to mitigate problems that arose as a result of Hurricane Irene (October 1999) and the "No Name Storm" (October 2000). As a Master Consultant we are responsible for the coordination of approximately twelve (12) engineering design consultants, eight (8) geotechnical firms and nine (9) land surveying firms involved in the design of approximately four hundred ninety (490) mitigation projects. These projects range from drainage improvements to total roadway reconstruction, canal dredging, culvert cleaning, and canal bank restoration. Additionally, we oversee the construction efforts of nine (9) contractors performing work with an estimated construction value of $35,000,000.00. Finally we are responsible for all document control related to these projects, approval of payment for design, survey, geotechnical reports, and construction in accordance with FEMA required guidelines. PERM yv � ®••-= i t +ENGINEERING I _ I RELEVANT EXPERIENCE PROJECT NAME: Friedland Manor Drainage Systems Improvements and Retention Area CLIENT'S NAME: City of Florida City Mr. Pedro Gonzalez, PE TYPE OF FACILITY Civil Engineering OR SERVICES: Design of drainage pipeline and retention area SRS PROJECT FEE: $37,500 CONSTRUCTION $1,602,000 COST: COMPLETION DATE: 2009 KEY INDIVIDUALS Ignacio Serralta, P.E. INVOLVED: Oliverio Sanchez, P.E. Jean - Claude Fontaneau Marilys Falcon PROJECT DESCRIPTION: The purpose of this project was to provide storm water retention for the drainage relief system of the Friedland Manor neighborhood in Florida City. The proposed retention area is connected to an existing pumping system inside the Friedland Manor area via a 30" diameter storm sewer pipe. 1 SRS conducted the storm water conveyance and retention basin modeling, prepare construction documents and assisted the City in obtaining environmental permits for the Project. The project included the design of a 10 -acre dry retention basin, inlet structure with energy dissipation features, a water level control devise with wireless remote pump controls and solar /battery capabilities, and seepage trenches for storm water relief. In addition 1,200 LF of 30" diameter storm sewer pipe and 2,180 LF of unpaved access road were designed for this project. The Project was permitted through South Florida Water Management District and Miami -Dade County D.E.R.M. in conjunction with the City of Florida City. s' -E NGINEERING.INC. syy �M PaSPATM .IM C_'1 4 fi6W iQ25 I �� T) B. B '' ". �rw Si. Ell B �ST& 13­. 2 C 13X Li. PROP_ 30' -22.5' BENT Wl! C C. Tz BL $ i4 16 2665 O 14 M' Li. W9. UM.1C C.i, Si9LC0 5W I II.'S' I ICW s' -E NGINEERING.INC. syy RELEVANT EXPERIENCE PROJECT NAME: City of Hialeah — ©N KEY INDIVIDUALS E. 4th Avenue Roadway INVOLVED: Improvements (CEI) (ARRA/LAP) CLIENT'S NAME: City of Hialeah PROJECT DESCRIPTION: Streets Division TYPE OF FACILITY Roadway and Drainage OR SERVICES: Construction 1 SRS PROJECT FEE: S118,916.44 ys COMPLETION DATE: 4/2010 to 12/2010 ©N KEY INDIVIDUALS Ignacio Serralta, P.E. INVOLVED: OliverioSanchez.P.E. Ralph Pereda Orestes Rodriguez PROJECT DESCRIPTION: 1 Construction administration support and inspection services during the construction of the East 4th Avenue Roadway Improvement Project from E. 25th Street to E. 32nd Street as required by the Department in order to meet FDOT's LAP Program requirements. Scope of Work included, but not limited to, the following: • Provide CEI and construction administration services as required for the LAP Program. • Attend preconstnxtion meeting and prepare minutes for distribution. • Review shop drawings submitted by Contractor for adherence to • construction documents. Attend bi-weekly progress meetings and prepare for minutes for distribution. • Respond to Contractor request for information and clarification of • contract documents. Coordinate utility issues/conflicts. Process all construdan correspondence and documents. • Review and recommend Contractor payment requisitions. • Review Contractor's certified payrolls. Conduct labor interviews to assure wage rate compliance. Verify Contractor's Disadvantaged Business Enterprise (DBE) on- going training program. • Review Contractor EEO requirements. Provide On the Job Training (OJT) monitoring and reporting. Review and recommend Contractor change order requests, if any. • Provide fulklme inspector (40 hours per week). • Conduct semi -final inspection and prepare punch list. Conduct final inspection, punch list, and contract close -out. QA/QC — limited materials and density tesfing Provide independent assurance testing and coordinate with testing lab to obtain sampling and testing. Compare test results and document in project records. • Provide photo history of project in digital format. Other construction phase engineering services as requested by the Department. A7 ENGINEERING RELEVANT EXPERIENCE PROJECT NAME: City of Hialeah t rt Fleet Fueling Station CLIENT'S NAME: City of Hialeah Mr. Jorge Guanchez r 1 L (305) 687 -2660 TYPE OF FACILITY Fueling Station OR SERVICES: SRS PROJECT FEE: $73,408 CONSTRUCTION COST: $636,444 COMPLETION DATE: February 2008 to December 2009 KEY INDIVIDUALS Ignacio Serralta, P.E. INVOLVED: Oliverio Sanchez, P.E. PROJECT DESCRIPTION: SRS services included the preparation of several conceptual site plan layouts for approval by the City. Preparation of construction documents for construction of a new fleet fueling station including replacing existing asphalt and concrete pavements, drainage systems, new fuel management systems, new video security systems, new electrical, fueling pumps, dispensers, underground fuel lines and appurtances, attendant's booth with power, A/C and data, replacement of existing underground fuel tank, and replacing the existing canopy. Other services included contracting and coordinating all topographical surveys and geotechnical investigations; and all permitting including City of Hialeah Building Department, DERM, and FIRE. Construction Phase services included attending construction meetings, reviewing shop drawings, responding to RFI's, providing periodic construction observations, and preparing close -out documents. ENGINEERING,INC. J �t It � �%� •- _•-•� -• _ __� �. t rt L p �j T-' ,r• r�� �7 r 1 L r \ i l•0, to u -- —o= - ENGINEERING,INC. SRS conducted a hydraulic analysis of the proposed force main to determine size of line and to verify compliance with previously prepared Annex Area Water and Sewer Master Plan. Prepared construction documents for the construction of a 8.43 MGD regional /booster sewer pump station consisting of a two -story wet /dry well building with four 470 -HP pumps, electrical control systems, telemetry, odor control system, and backup generator. The Pump Station has capacity to serve the entire annexed area bounded by NW 138`h Street (south), I -75 (east), NW 107`h Avenue (west), and NW 170`h Street to the north, and flows from Pump Stations 150, 152, 153, 154, 155, and 156; tributary portions of the gravity sewer system at point of connect. The pump station is located at Casas Park at W. 801h Street and W. 32nd Avenue. The project also included a meter station to measure flow out of station and the design of approximately 3,060 LF of force main pipeline (24 to 36 inch diameter) from pump station to point of connection with existing MDWASD force main a at NW 87`h Avenue and W. 801h Street. We also designed approximately 1,600 linear feet of 24- inch force main and 12 -inch gravity sewer mains from point of connection with existing City's force main and gravity system at W. 32nd Avenue and W. 761h Street to new pump station. �4 O �i'�g�w� ""EyNGIN EERING.ING.��. -_ 1 RELEVANT EXPERIENCE PROJECT NAME: Hialeah Pump Station CLIENT'S NAME: City of Hialeah Water & Sewer Dept. Mr. Armando Vidal, P.E. (305) 556 -3800 TYPE OF FACILITY City of Hialeah OR SERVICES: Annex Area Pump Station PS #200 SRS PROJECT FEE: $279,000 CONSTRUCTION $5,579,500 COST: COMPLETION DATE: February 2008 KEY INDIVIDUALS Ignacio Serralta, P.E. INVOLVED: Oliverio Sanchez, P.E. Jean - Claude Fontaneau PROJECT DESCRIPTION: SRS conducted a hydraulic analysis of the proposed force main to determine size of line and to verify compliance with previously prepared Annex Area Water and Sewer Master Plan. Prepared construction documents for the construction of a 8.43 MGD regional /booster sewer pump station consisting of a two -story wet /dry well building with four 470 -HP pumps, electrical control systems, telemetry, odor control system, and backup generator. The Pump Station has capacity to serve the entire annexed area bounded by NW 138`h Street (south), I -75 (east), NW 107`h Avenue (west), and NW 170`h Street to the north, and flows from Pump Stations 150, 152, 153, 154, 155, and 156; tributary portions of the gravity sewer system at point of connect. The pump station is located at Casas Park at W. 801h Street and W. 32nd Avenue. The project also included a meter station to measure flow out of station and the design of approximately 3,060 LF of force main pipeline (24 to 36 inch diameter) from pump station to point of connection with existing MDWASD force main a at NW 87`h Avenue and W. 801h Street. We also designed approximately 1,600 linear feet of 24- inch force main and 12 -inch gravity sewer mains from point of connection with existing City's force main and gravity system at W. 32nd Avenue and W. 761h Street to new pump station. �4 O �i'�g�w� ""EyNGIN EERING.ING.��. -_ 1 RELEVANT EXPERIENCE PROJECT NAME: West 361h Avenue ' (NW 97th Avenue) CLIENT'S NAME: City of Hialeah Streets Department ' Mr. Jorge Hernandez,PE (305) 687 -2656 TYPE OF FACILITY Roadway & Drainage OR SERVICES: Improvements W 361h Ave. (NW 971' Ave) SRS PROJECT FEE: $149,600 CONST. COST: $3,045,000 1 COMPLETION DATE: June 2007 KEY INDIVIDUALS Ignacio Serralta, P.E. INVOLVED: Jean - Claude Fontaneau PROJECT DESCRIPTION: 1 SRS provided engineering design, preparation of construction documents, plan permitting (DERM), and pre- construction phase support services to the City of Hialeah for the construction of W. 3611 Avenue between N.W. 138th Street and N.W. 154th. Work included the preparation of designs for the construction of paving, grading and drainage improvements and street lighting associated with the new roadway construction. The project included meeting with City of Hialeah staff and local regulatory agencies to establish design guidelines, conduct a utility search and identification of existing utilities and traffic controls, and review roadway design standards. We also designed and prepared the construction documents for the project that included the preparation of summary of quantities, signage and marking plans and quantities, MOT plan, specifications, and engineer's estimate of probable construction cost. SRS performed pre- construction support services, 1 including attending pre -bid meeting, responding to pre -bid request for information, and review of Bids. Also, providing supplemental information and clarification of construction documents to prospective bidders in the bid solicitation process, review bid submittals, and attend bid - opening meeting. 1 �o ENGIN EERING.INL. RELEVANT EXPERIENCE 1 1 PROJECT NAME: NW 138`h Street CLIENT'S NAME: City of Hialeah Streets Department Mr. Jorge Hernandez (305) 687 -2656 TYPE OF FACILITY Roadway & Drainage OR SERVICES: Improvements NW 1381h Street Widening SRS PROJECT FEE: $417,374 CONST. COST: $12,450,000 COMPLETION DATE: March 2007 to December 2008 KEY INDIVIDUALS Ignacio Serralta, P.E. INVOLVED: Oliverio Sanchez, P.E. Jean - Claude Fontaneau PROJECT DESCRIPTION: SRS was responsible for the engineering design, preparation of construction documents, plans permitting (Miami -Dade County Public Works, DERM, SFWMD, & FDOT), pre- construction phase support services to the City of Hialeah for the construction of NW 138`" Street between 1 -75 and N.W. 107`" Avenue. The work includes the preparation of designs for the construction of drainage improvements, street lighting and signalization, together with the design of a new 50' wide canal including culverts and a canal wall along the north side of NW 1381h Street between NW 971h Avenue and 1 -75. The new design includes a 6 -lane divided roadway, double left turns and deceleration lanes, and signalized intersections at NW 97th Avenue, NW 102 n Avenue, and NW 107`" Avenue. Construction administration support and inspection services during the construction including review shop drawings, respond to RFls, review payment request, conduct periodic inspections, and engineer certifications DD x� r rr__GG7 �. Y i,'�ENGINEE R ING,I N C.�k „my 1 r..` rr__GG7 �. Y i,'�ENGINEE R ING,I N C.�k „my I RELEVANT EXPERIENCE PROJECT NAME: Various Hialeah Roadway Projects CLIENT'S NAME: City of Hialeah Streets Department Mr. Jorge Hernandez (305) 687 -2611 TYPE OF FACILITY Hialeah Roadway and OR SERVICES: Drainage Improvements SRS PROJECT FEE: $3,618,168 1 COMPLETION DATE: 2001 thru 2009 KEY INDIVIDUALS Ignacio Serralta, P.E. INVOLVED: Oliverio Sanchez, P.E. Jean - Claude Fontaneau PROJECT DESCRIPTION: SRS provided engineering design, preparation of construction documents, permitting assistance, and pre- construction phase support services to the City of Hialeah for the reconstruction of over 26 miles of existing roadways, including the preparation of designs for the construction of drainage improvements associated with the roadway reconstruction. Our work included meeting with City of Hialeah staff and local regulatory agencies to establish design guidelines, conduct a utility search and identification of existing utilities, existing traffic controls, and review roadway design standards. We also designed and prepared the construction documents for the project. This work included the preparation of summary of quantities, signage and marking plans, signage and marking quantities, MOT plan, specifications, and engineer's estimate of probable construction cost. SRS also performed pre- construction support services, which included attending pre -bid meeting, responding to pre -bid request of information, and review of bids. This also included providing supplemental information and /or clarification of construction documents to prospective bidders during the bid solicitation process, review bid submittals, attend bid- ' opening meeting, and provide construction inspections as needed. (SRS was Prime Consultant) sA?y�0 �: ENGINEERING�INC. RELEVANT EXPERIENCE PROJECT NAME: Section 26 Sewer Improvements CLIENT'S NAME: City of Hialeah Water & Sewer Dept. Mr. Armando Vidal, P.E. TYPE OF FACILITY Regional Pump Station OR SERVICES: SRS PROJECT FEE: $672,272.00 COMPLETION DATE: On -going KEY INDIVIDUALS Ignacio Serralta, P.E. INVOLVED: Oliverio Sanchez, P.E. Jean - Claude Fontaneau Delcy Munoz Percy PROJECT DESCRIPTION: SRS prepared construction drawings for a new regional pump station consisting of a submersible pump station with 4 submersible pumping units (215 HP) with a peak capacity of 8,880 GPM (12.8 MGD) and valve chamber. The pump station site included a building housing the electrical control room and a storage area; an odor control unit; MDWASD flow meter, emergency generator, and other improvements. The project also included the design of upgrade improvements to 11 existing pump stations (PS 132, PS 133, PS 134, PS 135, PS 137, PS 138, PS 139, PS 140, PS 141, PS 142, & PS 144). Upgrades included replacement of existing pumping units, new electrical control panels, new electrical services, replacement of PS piping, new valve vaults and fittings, demolition of existing wet well tops and reconstruction with new hatches, wet well refurbishment, new telemetry systems, and emergency generators with fuel tanks. SRS also prepared construction drawings for approximately 15,600 LF of sewer force main pipelines (8 -inch to 30 -inch diameter), and 8,226 LF of 48 -inch and 3,999 LF of 36 -inch transmission sewer force main pipelines, including 48 -inch pipe canal crossing. v v ENGiNEER�NG,INC. RELEVANT EXPERIENCE PROJECT NAME: City of Hialeah Annex Area - Water and Sewer CLIENT'S NAME: City of Hialeah Water & Sewer Dept. Armando Vidal, P.E. (305) 556 -3800 TYPE OF FACILITY City of Hialeah OR SERVICES: Annex Area Water & Sewer Improvements SRS PROJECT FEE: $420,358 1 COMPLETION DATE: February 2006 to July 2007 KEY INDIVIDUALS Ignacio Serralta, P.E. INVOLVED: Oliverio Sanchez. P.E. Jean - Claude Fontaneau Orestes Rodriguez PROJECT DESCRIPTION: This project consisted of the engineering design of water and sewer infrastructure required to serve the newly annexed area to the City of Hialeah. This work included the preparation of construction documents and permitting assistance to the City. Our work included the preparation of a water and sewer master plan for the area in order to determine the current and future service needs and the size and location /alignment of water and sewer main lines needed along the major arterial roadways. It also included the design of a regional sewer pump station with backup generator with sufficient capacity to serve the entire annexed and adjacent areas. Additional work included the design of approximately 1,480 LF of 24 -inch gravity sanitary sewer mains, approximately 10,724 LF of 24 -inch force main extensions, approximately 3,229 LF of 36 -inch force main extensions, and approximately 12,166 LF of 36 -inch water main extensions. (SRS was Prime Consultant) RELEVANT EXPERIENCE PROJECT NAME: Job Corp Center Design -Build Homestead Air Force Base CLIENT'S NAME: U.S. Department of Labor/ Parker Building Co. Mr. Steve Clemmons (334) 887 -7275 TYPE OF FACILITY Homestead Job Corp OR SERVICES: Center Engineering Design and Construction Management SRS PROJECT FEE: COMPLETION DATE: March 1999 KEY INDIVIDUALS Ignacio Serralta, P.E. INVOLVED: PROJECT DESCRIPTION: SRS performed the site civil and environmental engineering design of a 15- building /40 acre site including paving, grading, drainage system, water and sewer systems, and fire protection lines. Work included design, permitting and construction administration of upgrades to pump station No. 934 to meet MDWASD standards. Upgrades consisted of demolition of above ground structure, design of new pumps, new top slab, electrical controls, SCADA, and site improvements and design of new 1,400 LF -12" force main to serve pump station. Work also included coordinating with DERM, USAF, SFWMD, and WASD as well as coordinating the video inspection and rehabilitation of the existing sanitary sewer system, and the installation of over 1,870 LF of 24" DIP, 3,720 LF of 12" DIP and 250 LF of 8" DIP water mains. A r_. p 7� �_ � ENGIN EERING�ING. _ RELEVANT EXPERIENCE K .P ✓.y �_ a - -+tea. p+ q� PROJECT NAME: Miami -Dade County Fire Rescue Stations CLIENT'S NAME: Landera Associates, P.A. Mr. Osvaldo L. Landera TYPE OF FACILITY Fire Rescue Stations OR SERVICES: SRS PROJECT FEE: COMPLETION DATE: KEY INDIVIDUALS INVOLVED: PROJECT DESCRIPTi $150,666.00 On -going Ignacio Serralta, P.E. Oliverio Sanchez, P.E. Marilys Falcon :ON: SRS prepared the site civil engineering design plans and specifications for the construction of four new fire rescue stations for Miami -Dade County. Services rendered included the design of site utilities (water, fire and sewer), parking area paving and grading, site grading, and drainage plans. Work included preparation of ERP permits for wetlands and DERM coastal permits SRS also coordinated with local regulatory agencies to obtain approvals on utility connections, prepared and submitted plans and applications for "dry-run" and final review by regulatory agencies, and attended project meetings and pre - design field site visits. Construction Phase services included weekly construction meetings, reviewing shop drawings, responding to RFI's, providing periodic construction observations, and preparing close -out documents. Stations included: • Homestead Fire Rescue Station No. 16 • Doral North Fire Rescue Station No. 69 • Model Cities Fire Rescue Station No. 2 • Sunny Isles Beach Fire Rescue Station No. 10 Miami � Camta I. Rescue Oeyvrcmmt Ilmunl F Rescue Swioo:\n 16 Model Cities Fire Rescue Station No.2 \. Mum1 Dade Fire Rescue Department Sunny Isles Reach Fire Resmle Station No. 10 .. ffin� } ENGINEERING.INC. W RELEVANT EXPERIENCE PROJECT NAME: MDWASD Pump Stations Upgrades CLIENT'S NAME: Miami Dade County Water & Sewer Dept. TYPE OF FACILITY Sewer Pump Stations OR SERVICES: SRS PROJECT FEE: $530,087 COMPLETION DATE: May 2008 - Present KEY INDIVIDUALS Ignacio Serralta, P.E. INVOLVED: Oliverio Sanchez, P.E. Delcy Munoz Ramon Lopez PROJECT DESCRIPTION: SRS provided engineering design and preparation of construction documents (Plans and Specifications) for the construction of upgrades to existing Pump Stations. Upgrades included new pumping units, new electrical control panels, new electrical services, new telemetry systems, replacement of PS piping, new valve vaults and fittings, new wet wells, demolition of existing pump stations, and associated site improvements. Services also included plans processing and permitting; and bid phase services. SRS also provided limited construction support services including attending construction meetings, respond to RFI's, review shop drawings, review and approval to change order requests, attend PS Start Up Inspection. MDWASD Pump Stations Nos. 7, 64, 140, 427, 430, 502, 767, and 1018. COUNTY AG 7 1 �Ca \V �� EN GINEERING�ING. RELEVANT EXPERIENCE PROJECT NAME: Miami International Airport Employee Parking Area Storm Water Study and Design of Interim Drainage Improvements Miami, Florida CLIENT'S NAME: Miami International Airport TYPE OF FACILITY Design and CEI Services ' OR SERVICES: SRS PROJECT FEE: $ 78,000.00 COMPLETION DATE: Started: January 1999 Completed: Feb. 2000 KEY INDIVIDUALS Ignacio Serralta, P.E. INVOLVED: Patrick J. Rebull, P.E. PROJECT DESCRIPTION: 1 Provision of on -going miscellaneous civil engineering services to meet the requirements for fast response and specialized engineering services for the Miami -Dade Aviation Department. This service order required conducting a study for the 2000 vehicle 700 -acre employee parking lot and drainage basin at Miami International Airport. The study analyzed the current drainage system and made recommendations for the improvement of the system to ' facilitate drainage of the parking lot while meeting DERM and South Florida Water Management District design criteria. The project involved data gathering, analysis of existing conditions, determination of future land use impact, development and evaluation of alternatives including 1 storm water modeling for the 5, 10, 25 and 100 year storm flows, cost engineering and presentation of final recommendations. A second service order involved preparation of design and construction documents for the construction of interim drainage improvements to resolve severe flooding 1 conditions in three of the sub - drainage basins. This project is currently under construction with on -going construction administration services being provided. 1 rA Ir 1 �^ (' d: ENGINEERING,ING. RELEVANT EXPERIENCE PROJECT NAME: County -wide Construction Inspection Services CLIENT'S NAME: Miami -Dade County Public Works and DERM Antonio Cotarelo, P.E. 305- 375 -1918 TYPE OF FACILITY Construction Inspection OR SERVICES: Services of Roadways and Drainage Systems SRS PROJECT FEE: $745,000 COMPLETION DATE: August 2006 to tOctober 2007 KEY INDIVIDUALS Ignacio Serralta, P.E. INVOLVED: Oliverio Sanchez. P.E. Juan Castro Thomas Ferguson PROJECT DESCRIPTION: Construction Inspection Services Project for Miami -Dade County (Public Works and DERM) beginning in May of 2006 through October of 2007. We were responsible for supplying 1 engineering and construction inspection services to the County, as needed, on its roadway and drainage improvement construction projects. We were responsible for providing and supervising six ' (6) full -time on -site construction inspectors and one (1) supervisor for the duration of the construction. The construction projects consisted mostly of roadway reconstruction and drainage improvement projects throughout the County. Our scope of services included overseeing, coordinating and inspecting the work of design consultants, surveyors and construction contractors. Responsibilities also included monitoring, record keeping, approving and recommending requisitions for payments, review of change orders, estimations, claims, scheduling, shop drawings and remedial designs. Responding ' to request for information (RFI), and assuring compliance with construction documents. (SRS was Prime Consultant) Aq on _ Xr ✓.i3v a ­� ,n C� "♦ .q./ f s I . A. Y ENGINEERING�INC. RELEVANT EXPERIENCE PROJECT NAME: Miller Drive Widening CLIENT'S NAME: Homestar Mr. Jose Fernandez TYPE OF FACILITY Roadway & Drainage OR SERVICES: Improvements Miller Drive SW 152nd to 158`h Ave. SRS PROJECT FEE: $88,500 COMPLETION DATE: February 2005 KEY INDIVIDUALS Ignacio Serralta, P.E. INVOLVED: Jean - Claude Fontaneau PROJECT DESCRIPTION: SRS provided engineering design, preparation of construction documents, and permitting assistance, and construction phase support services to the Miami -Dade County Public Works Department (M.D.C.P.W) for the widening of Miller Drive between SW 152nd Avenue and SW 1 158 Avenue (3,250 LF), as well as including the preparation of designs for the construction of drainage improvements associated with the 1 roadway reconstruction. The work included meeting with Miami -Dade County Public Works staff and local regulatory agencies to establish design guidelines, conduct a utility search and identification of existing utilities, existing traffic controls, and review roadway design standards. Construction documents prepared for the project consisted of the roadway plan and profiles, summary of quantities, signage and marking plans, signage and marking quantities, MOT plan, and specifications. Iry EN GINEERING�INC. I RELEVANT EXPERIECE 1 PROJECT NAME: Miller's Pond Park CLIENT'S NAME: Miami -Dade County Park & Recreation Department Mr. Alan Velez TYPE OF FACILITY OR SERVICES: SRS PROJECT FEE: COMPLETION DATE: KEY INDIVIDUALS INVOLVED: PROJECT DESCRIPTION: Miller's Pond Park New Parking Lot Design $40,000 Est. May 2003 Ignacio Serralta, P.E. Jean - Claude Fontaneau SRS provided the engineering design, permitting and construction phase services of Miller's Pond Park including site utilities, parking area, and concrete walkways. This work included the design of paving, grading, and drainage plans for 118 cars parking lot. Our scope of work also included construction plans for "dry-run" and "final" review by local regulatory agencies including Miami -Dade County Public Works Dept., and Miami -Dade County Park and Recreation Department. Construction Phase services included bi- weekly construction meetings, reviewing shop drawings, responding to RFI's, providing periodic construction observations, and preparing close- out documents. W RELEVANT EXPERIENCE I aPROJECT NAME: Naranja Lakes CPA CLIENT'S NAME: Naranja Lakes CRA Jorge Fernandez (305) 375 -1543 TYPE OF FACILITY OR SERVICES: SRS PROJECT FEE: CONSTRUCTION COST: COMPLETION DATE: KEY INDIVIDUALS INVOLVED: Const. Management Consultant $ 208,000 S 17,745,355 On -Going Ignacio Serralta, P.E. Jean Claude Fontaneau PROJECT DESCRIPTION: As Construction Consultant, SRS's responsibilities included the review and recommendation of contract reward to the Developer, the review and approval of payment requests submitted by Developer, review and make recommendations pertaining to change orders, design changes and budget reallocations, meeting with the Developer on a regular basis regarding the construction schedule and related issues, conducting regular site visits of the construction site to observe on- going construction, and attend all meetings, as directed by the CRA, to provide consultation to the CRA. As an initial task, SRS prepared a "Preliminary Report consisting of an analysis of the amounts previously paid to the Developer to date as set forth in the twenty -one (21) Request for Payment submitted by the Developer to the CRA and the County including an analysis of changes in scope, materials and quantities from what is set forth in the revised Master Plan of Improvements attached to the First Amendment to the Redevelopment Agreement as well as any amounts paid over budgeted amounts all as reconciled to the approved Schedule of Values. Construction improvements included roadways, landscaping, new bridge, water and sewer pipelines and sewer pump stations. Ii Rgl ullling Dur Cuff141uG11/ TR •.: a �, 1 ems` t�?.��1`�+`tiYfl? pl rl v t, 8011; ENGINEERING,INC. I RELEVANT EXPERIENCE PROJECT NAME: CLIENT'S NAME: TYPE OF FACILITY OR SERVICES: SRS PROJECT FEE: COMPLETION DATE: KEY INDIVIDUALS INVOLVED: South Florida Evaluation and Treatment Center Florida City, Florida Design -Built Schenkel Shultz Architecture 111East Wayne Street, Suite 555 Fort Wayne, IN 46835 Mr. Charles Goodman (407)872 -3322 Civil Engineering Design 220 Bed Evaluation and Treatment Center June 2006 Ignacio Serralta, P.E. Oliverio Sanchez, P.E. Jean - Claude Fontaneau Ramon Lopez PROJECT DESCRIPTION: This project consisted of the engineering design plans and specifications for the construction of an approximately 40 -acre evaluation and treatment center located in Florida City, Florida. Work included the design of on -site paving, grading and drainage, surface water management design, off - site roadway improvements, on -site gravity sewer system, private sewer pump stations and force mains and on -site and off -site water system to serve on -site development We also assisted in the preparation of applications and documentation for submittal of an Environmental Resources Permit as required by SFWMD, DERM, and ACOE; preparation of National Pollutant Discharge Elimination System Notice of Intent applications and documentation. Construction phase services including reviewing payment request, responding to RFI, and conducting construction inspections. L 0 ENGIN EERIN G.INC. RELEVANT EXPERIENCE PROJECT NAME CLIENT'S NAME TYPE OF FACILITY OR SERVICES: Ponce de Leon Blvd. CEI City of Coral Gables Depart. of Public Works Mr, Ernesto Pino, RA (305) 460 -5004 Construction Inspection Services SRS PROJECT FEE: S 194,663.53 CONSTRUCTION COST: S 1,816,772.42 COMPLETION DATE: 01/05/2012 KEY INDIVIDUALS Ignacio Serralta, P.E. INVOLVED: Oliverio Sanchez. P.E. Ralph Pereda Luis Hurtado PROJECT DESCRIPTION: Construction administration support and inspection services during the construction of Ponce de Leon Boulevard Median Beautification project as required by the Department in order to meet FDOT's LAP Program requirements. Scope of Work included, but not limited to, the following: • Provide CEI and construction administration services as required for the LAP Program. • Attend precorstrudon meeting and prepare minutes for distribution. • Review shop drawings submitted by Contractor for adherence to construction documents. • Attend bFweekly progress meetings and prepare for minutes for d&nbution. • Respond to Contractor request for information and ctaoflcation of contract documents. • Coordinate utility issuestconflicts. • Process all construction correspondence and documents. • Review and recommend Contractor payment requisitions. • Review Contractors certified payrolls. • Conduct labor interviews to assure wage rate compliance. • Verify Contractors Disadvantaged Business Enterprise (DBE) on- going training program. • Review Contractor EEO requirements. • Provide On the Job Training (OJT) monitoring and reporting. • Review and recommend Contractor change order requests, d any. • Provide full-time inspector (40 fours per week). • Conduct semi-final inspection and prepare punch list. • Conduct final inspection, punch list, and contract dose -out. • QA/QC — limited materials and density testing Provide independent assurance testing and coordinate with testing lab to obtain sampling and testing. Compare test results and document in project records. • Provide photo history of project in digital format. • Other construction phase engineering services as requested by the Department. b � ( r e9� %�t"A1j✓j r b a �• oe oa zojo 7` E C �T� +nn•� .y�a�"ENGIN EERING INC.�� s �i RELEVANT EXPERIENCE 0 PROJECT NAME: Three Lakes Park CLIENT'S NAME: Miami -Dade County Parks & Recreation Department Mr. Alan Velez TYPE OF FACILITY Three Lakes Park OR SERVICES: New Parking Lot Design SRS PROJECT FEE: $40,000 COMPLETION DATE: May 2003 KEY INDIVIDUALS Ignacio Serralta, P.E. INVOLVED: Jean - Claude Fontaneau PROJECT DESCRIPTION: SRS provided the engineering design along with permitting and construction phase services for Three Lakes Park including site utilities, parking area, building site, play fields, access road, and walkways. This work included the design of 12" water main extension, gravity sewer main extension, paving, grading, and drainage plans for a 680 L.F. of access road and a 97 cars parking lot. The scope of work also included preparing and submitting water service agreement, DEP applications and construction plans for "dry -run" and "final" review by local regulatory agencies including Miami -Dade County Building Department, MDWASD, Miami -Dade Public Works Dept., Miami -Dade Fire Dept., DERM, and State of Florida Health Department. Construction Phase services consisted of weekly construction meetings, reviewing shop drawings, responding to RFI's, providing periodic construction observations, and preparing close -out documents. 1L_ - - - -� n•w�� �u 0 �® I „`- - - - - 4 r_ I A. _r_rSS7i `y,,,. ._ ENGINEERING,INC. 1 RELEVANT EXPERIENCE PROJECT NAME: CEO - Pinehurst CLIENT'S NAME: City of Miami TYPE OF FACILITY Construction OR SERVICES: Engineering and Observation Services Pinehurst Storm Sewer Retrofitting Project SRS PROJECT FEE: $160,000 COMPLETION DATE: January 2006 KEY INDIVIDUALS Ignacio Serralta, P.E. INVOLVED: PROJECT DESCRIPTION: SRS supplied engineering and technical personnel on an as needed basis to the City of Miami to provide Construction Engineering and Observation Services for the administration of several construction projects throughout the City of Miami. For this project, SRS provided full -time on -site inspection personnel and supervisor for the duration of the construction. The specific tasks involved in the project included o Drainage Improvements o Curb, Gutter and Sidewalk Replacement • Milling and Resurfacing • Traffic Signal Improvements • Construction coordination • Supervise inspectors o Schedule and attend construction meetings • Monitor contractor's work • Review and process contractors' application for payment • Maintain daily project journal with photographs o Administration of changed work • Provide problem resolution • Request and review material testing n Coordinate with Engineer • Coordinate with utility companies o Project closeout • Construction cost 32,360,000. RELEVANT EXPERIENCE PROJECT NAME: Miami Springs Gymnasium 1 CLIENT'S NAME: Rodriguez Pereira Architects, Inc. Mr. Adalberto Pereira TYPE OF FACILITY Gymnasium and OR SERVICES: Community Center SRS PROJECT FEE: $60,772.25 COMPLETION DATE: March 2010 KEY INDIVIDUALS Ignacio Serralta, P.E. INVOLVED: Jean - Claude Fontaneau Delcy Munoz 1 PROJECT DESCRIPTION: Design build project consisting of new 37,851 SF gymnasium building with adjacent 107 -car parking lot. SRS provided design on site utilities including 12" water main extension, site paving, grading and drainage, and permitting, also provided construction phase services. 1 Tr j Team's Organization t ORGANIZATIONAL STRUCTURE OF THE PROJECT TEAM SRS Engineering, Inc. is confident that if our team is selected for this project/contract, we will execute the contract in a professional, efficient and successful manner in cooperation with City and regulatory agencies. Our firm's staff, as well as our sub - consultants', are accustomed to working with each other in an almost seamless manner. Because of the proximity of our office locations and our continually successful working relationship, many of the day -to -day design development, permitting and construction management decisions are accomplished jointly under one roof. Our respective team members recognize that a simple and easy -to- understand organizational structure facilitates the transfer of information, eases the process of early decision - making and promotes an appropriate level of awareness among team members. SRS Engineering, Inc. is a corporation organized in the State of Florida on September 14, 1995. It was founded by our President, Ignacio Serralta. Our offices are located at 5001 SW 741^ Court, Suite 201, Miami, FL 33155. All services required by the Town shall be provided by this office. The office personnel consist of 15 full -time permanent employees including engineers, designers, construction managers, field inspectors and support staff. Our office is just minutes away from SR 826, and a short 40- minute drive from the City of Sunny Isles Beach. J•tF {!(]�q !� M1� -. V iii sg 1 S. _ y Our firm is further supported by an excellent group of consulting professional firms whose unique experience and expertise providing similar services make our group an exceptional team. Our combined strengths and capabilities will ensure that the Town the ability to complete the wide range of tasks required on this project. ©� Fandrei Consulting, Inc. (FCI) is a local traffic and transportation engineering firm. The firm is led by Mr. Henry Fandrei, P.E., PTOE, who has over 42 years of professional engineering experience, including more than 32 years here in South Florida. FCI can provide a wide range traffic engineering services including traffic operations, signal timing, signal systems, engineering design, traffic data collection, traffic simulation, neighborhood traffic control, planning, and environmental impact analysis of highway projects, transit/highway interface, parking, signal warrant analysis, project management, construction supervision and traffic accident reconstruction. FEI will provide all traffic engineering and studies, and signal design services to our team. 0 ENGINEERING.INC. 1ITeam's Organization AMEC's Florida operation employs more than 500 people in offices ame located in every region of the state, including more than 100 in South Florida. We can draw on our experienced local managers and geographical reach to support the needs of clients, regardless of project size and complexity. In Miami -Dade County, AMEC is located at 5845 NW 1581h Street, Miami Lakes, Florida 33014. Our South Florida offices have provided professional services to the area for more than four decades. t During the last 30 years, AMEC has provided geotechnical and materials testing engineering services for various public agencies, organizations, and federal, state and regional governments, as well as industrial and private clients. AMEC has significant and relevant project experience providing quality geotechnical and materials testing services for various local municipalities and state and federal agencies that include but not limited to Miami -Dade County Public Works Departments, the City of West Palm Beach, School Districts of Palm Beach, Broward, and Miami - Dade Counties, the Florida Department of Transportation (FDOT) D4 /D6, Florida's Turnpike Enterprise, South Florida Water Management District (SFWMD), Broward County Aviation Department (BCAD), Florida East Coast (FEC) Railway, Tri -Rail Commuter Rail, and Fort Lauderdale Port Authority, along with various design -build projects which include Jewfish Creek Bridge, NW 5th Street Bridge, 1 -395, and the 1 -595 Corridor Improvement Program. AMEC's also provide environmental engineering and ecological services including environmental site assessments, hazard assessments, and remediation and mitigation strategies and plans, water quality assessment and monitoring, wetlands surveys, and biological and ecological studies that are required in environmental engineering project activities. AMEC also offers a broad range of CEI services. AMEC has provided CM and CMT services to county, state and federal governments in the construction of roads, bridges and support structures as well as buildings, i stadiums, exhibit halls and municipal facilities. Services include concrete testing, steel reinforcement inspection and testing, steel precast (architectural), precast inspection (structural), foundation inspection, soils testing, and testing/ inspection of masonry, fireproofing, waterproofing, roofing, and bituminous materials. Mr. Brian S. Hathaway will be responsible for providing all geotechnical and engineering support services to our team. O HADONNE Hadonne Corp. is an experienced (SBE /CBE) land surveying and mapping firm established in Miami -Dade County in 2001. Hadonne brings to the team extensive experience in the areas of conventional surveying, mapping and global positioning systems (GPS). Since commencement, the firm has diligently worked to meet the needs of both our private and public sector clients. HADONNE specializes in providing Surveying and Mapping, Utility Coordination and Sub - Surface Utility Engineering (S.U.E.). They are a responsive and innovative firm using state -of- the -art technologies. Hadonne has four (4) registered surveyors on staff and runs (5) survey field crews daily. Hadonne currently serves as the Town Surveyor for the Town of Medley, Town of Doral, Village of Pinecrest and Town of Cutler Bay. Hadonne is led by Mr. Abraham Hadad who is the firm's President. They will be responsible for providing all surveying and mapping services under this agreement. i. nJI �J ENGINEERING,INC. Team's Organization SRS Engineering, Inc. shall be the responsible for the overall coordination and management of projects assisted to our Team. SRS will coordinate the work of our subconsultants and oversee and review their work products. SRS will be the design firm, responsible for the project management and design of projects and the preparation of all the construction documents and support services. SRS will also be providing construction phase services including periodic site inspections and document control. Our Team will be led by Mr. Ignacio Serralta, P.E., who will serve as Principal -In- Charge. Mr. Serralta will be personally overseeing the management of the project and coordinating between the Town and the SRS Team. Mr. Serralta will be your key point of contact and seeing that Town's requirements are met is his main responsibility. Our Senior Project Manager will be Mr. Oliverio Sanchez, P.E. He will be in charge of the day to day management of the project including overseeing all design and construction phase services, reviewing quality control and quality assurance, project scheduling and costs, and preparation of all work products. Mr. Sanchez will be assisted and supported by Mr. Jean - Claude Fontaneau, our Senior Project Engineer. Mr. Fontaneau is primarily responsible for the engineering design and preparation of all construction documents. City of Sunny Isles Beach Continuing Professional Services for Architectural, Landsc Architectural, Engineering and Land Surveying Firms Only Request for Qualifications No. 14 -07 -02 (Engineering) City of Sunny Isles Beach SRS Inc. Project Manager /Civil and Structural Engineering Ignacio Serralta, P.E. (Principal in Charge) Oliverio Sanchez, P.E. (Sr. Project Manager gn am 13212MD121171:06 Traffic Engineering and Signal Design Geotechnical / Envlronmental Engineering Surveying & Mapping surface thilhy. Engineering Henry A. Fandrei, P.E., PTOE Brian S. Hathaway, PE Abraham Hadad, PSM Organizational Chart - Team 06171 7 E N NGIN CI , . eTeam's Organization Our Team will be led by Mr. Ignacio Serralta, P.E., who will serve as Principal -In- Charge. Mr. Serralta is the President of the firm and sole owner. He has over twenty -five years of experience in civil engineering planning, design, and management for a wide range of public works, site development, and infrastructure projects. Mr. Serralta will be personally 1 overseeing the management of the assigned projects and coordinating between the City and the SRS Team. Mr. Serralta will be your key point of contact. 1 Our Senior Project Manager will be Mr. Oliverio Sanchez, P.E. Mr. Sanchez has over thirty - three years of experience in project management and engineering design for both public and private sectors in Central and South Florida, Mexico, the Caribbean and Spain, in fields such as land development and site planning, airport work on both landside and airside, port and marina developments, municipal engineering, storm water management and drainage engineering, roadway engineering, construction management, field supervision, and quality control. His extensive municipal project experience has provided him with broad knowledge in project coordination, dealing with governmental agencies and plan approvals and processing. Mr. Sanchez was the project manager on several City of Sunny Isles Beach projects including Bella Vista Park, Collins Avenue Beautification, and Arlen House 1 Streetscape. Our Design Project Manager will be Mr. Jean - Claude Fontaneau, who has fourteen years of experience in civil engineering design. He has been responsible for the planning and design of a variety of municipal and site development projects. Mr. Fontaneau is primarily responsible for the engineering design and preparation of plans and specifications including the design of pump stations, water and sanitary sewer pipelines, site development projects, roadway improvements, and storm drainage systems. Mr. Fontaneau was the project manager in charge of the design of several municipal projects including NW 138th Street Roadway and Drainage Improvements, NW 97th Avenue Roadway Improvements, Miller Road Widening and several municipal site improvement projects including parks, marinas and community centers. Our Structural Engineer will be Gisela Rey, P.E. Ms. Rey has over 25 years of experience in design, planning and management of structural engineering projects for port facilities, including docks, fender systems, harbor crane supports, wharf extensions, mega cruise ship terminals and canal stabilization. Among her recent experience is the seawall replacement at Archeological Tequesta Circle in Miami River. Responsibilities included design and construction document preparation. Our principals and project managers are further supported by a staff is a highly motivated, experienced group of professionals including engineers, designers, construction managers, field inspectors and support staff. MN� j io ENGINEERING.INC. Team's Organization City of Sunny Isles Beach Continuing Professional Services for Architectural, Landsc Architectural, Engineering and Land Surveying Firms Only Request for Qualifications No. 14 -07 -02 / (Engineering) I Oliverio Sanchez, P.E. Sr. Project Manager Vice President Control and Pssurance City of Sunny Isles Beach Ignacio Serralta, P.E. President Principal In Charge CIVIL ENGINEERS Jean-Claude Fontaneau Project Manager Delcy Munoz Percy; Alex Medina Design Engineers STRUCTURAL ENGINEER Gisela Rey, P.E. DESIGNERS Alex Morales, Ynet Prieto, Maydi Alcaz Organizational Chart - SRS °- f 1 t ;O. n NA) ,, F SI C,•• O. tVN •� Ralph Parade Office Administrator/ Contracts Specialist Mabel Rodriguez CIVIL ENGINEERS Steven Fazeka. INSPECTORS Luis Hurtedo Juan Galas Seife ad-00 ENGINEERING.INC. n �E F \J o tl // t i_.Mv . v O � yE 99 • F L C,�Y OF SUN PN� Y/ Principal f Mr. Ignacio Serralta has over twenty -three years of experience in civil engineering planning, design and management for a wide range of public works, site development and infrastructure projects. He has been responsible for the design of roadway improvements, storm drainage systems, water and sanitary sewers transmission pipelines, as well as reservoirs and pump stations. He is familiar with the many facets of public and private project management and has served as Project Manager /Engineer on many projects. Mr. Serralta will head the team on this project and be responsible for all facets of the operation. PROFESSIONAL EXPERIENCE Mr. Ignacio Serralta's major recent responsibilities include: • FEMA /DORM Restoration Project, Various Sites, Miami -Dade County, Florida Program Manager from November 2001 through December 2005. The project was a jointly funded effort supported by the Federal Government, the State of Florida and Miami -Dade County and was intended to mitigate problems that arose as a result of Hurricane Irene (October 1999) and the "No Name Storm" (October 2000). As Master Consultant, we oversaw the construction efforts of nine contractors performing work with an estimated construction value of $35,000,000.00. Additionally, we were responsible for the coordination of approximately 12 engineering design consultants, 8 geotechnical firms and 9 land surveying firms involved in the design of approximately 490 mitigation projects. These projects ranged from drainage improvements to total roadway reconstruction, canal dredging, culvert cleaning and canal bank restoration. Finally, we were responsible for all document control related to these projects, approval of payment for design, survey, geotechnical reports and construction in accordance with FEMA required guidelines. • MDWASD Pump Stations Upgrades, Multiple Locations, Miami -Dade, Florida Principal In- Charge for the engineering design and preparation of construction documents (Plans and Specifications) for the construction of upgrades to existing Pump Stations. Upgrades included new pumping units, new electrical control panels, new electrical services, new telemetry systems, replacement of PS piping, new valve vaults and fittings, new wet wells, demolition of existing pump stations, and associated site improvements. Services also included plans processing and permitting; and bid phase services. • Principal -in- Charge responsible for overseeing the design, preparation of construction documents, plans permitting, and pre- construction phase support services to the City of Hialeah for the construction of NW 138`h Street between I -75 and N.W. 107" Avenue. The total length of project was approximately 7,200 linear feet and consisted of a 130' wide, 6- lane roadway with center median and new 70' wide canal. • Principal -in- Charge responsible for overseeing the design, preparation of construction documents, plan permitting, and pre- construction phase support services to the City of Hialeah for the construction W. 36`h Avenue between N.W. 138`h Street and N.W. 154`h Street. The total length of project was approximately 5,400 linear feet and consisted of a 100' wide, 4 -lane roadway with center median. A 'Woo >. .., ®� "SNEERING INC.y Ignacio Serralta, P.E. Principal • Homestead Air Force Base, Pump Station #934, Homestead, Florida Principal In- Charge for the preparation of construction documents for upgrading PS #934 to MDWASD standards. Responsible for design of construction documents, demolition drawings, structural details, new electrical controls, SCADA, and new 12" force main. Obtaining permits, construction management, inspections, and close out. • Principal -in- charge for the design, permitting and construction phase services for several New Fire Rescue Stations including West Sunset, North Doral, Sunny Isles, Homestead, and Model City. These projects included the design of site utilities, parking area, and building sites. This work included the water and sewer service connections, site paving, grading, and drainage, pavement marking and signage plans. Our scope of work also included preparing and submitting water service agreement, DEP applications and construction plans for "dry- run" and "final" review by local regulatory agencies including Miami -Dade County Building Department, MDWASD, Miami -Dade Public Works Dept., Miami -Dade Fire Dept., DERM, and State of Florida Health Department. • Crandon Golf Course, Park and Marina, Key Biscayne, Florida. Project Civil Engineer for the design and construction phase services of new sewer systems. These projects involved the design of approximately 1,900 LF gravity sewer mains and two sewer pump stations. Work also included abandoning the existing septic tanks and drain fields and obtaining permits from DEP, DERM and the Building Department. Services included weekly construction meetings, reviewing shop drawings, responding to RFI's, providing construction observations and preparing close -out documents. • Kendall Commons, Kendall Drive & SW 169 Ave., West Miami -Dade, Florida Principal In- Charge for the preparation of civil engineering design plans and specifications for the construction of an approximately 160 -acre traditional neighborhood district development which was comprised of 1,256 residential units, as well as over 132,000 sq. ft. of commercial retail, 15 -ac lake, and a 9 -acre school. Duties included the civil design of on -site roadways, paving and grading, drainage and storm water management systems, water and sewer systems, design of off -site 24" water main and 20" sewer force main extensions, regional sewer pump station with two 100 -HP pumps and backup generator. • Project Manager for the Owen Roberts International Airport, Cayman Islands, Land Side Master Plan Improvements. Responsibilities included the design and preparation of construction documents for the construction of land side master plan improvements including design of site master plan, geometry plan, demolition plan, paving, grading and drainage, new main entrance road, new paved long term parking area, two new staff parking areas, rental car parking area, new curbside loading /unloading areas and associated access drives. Sewer systems improvements included the design of a new 30,000 GPD sewage treatment plant, sewer pump station and force main. EDUCATION Bachelor of Science in Civil Engineering California State University, Los Angeles, California LICENSES Registered Civil Engineer, State of California, Lic. No. C47828 Registered Engineer, State of Florida, Lic. No. PE45609 Certified Uniform Building Code Inspector (UBCI) Former Board Member, Florida International University Honors College a Vice President/ Sr Project Manager yyi RaA - -.e1wb'.a>iam5t Mr. Oliverio Sanchez has over thirty years of experience in project management and engineering design for both public and private sectors in Central and South Florida, Mexico, the Caribbean and Spain, in the fields of land development and site planning, airport work on both landside and airside, port and marina developments, municipal engineering, storm water management and drainage, roadway engineering, construction management, field supervision and quality control. His experience has provided him with helpful knowledge in the field of governmental agencies coordination, plan approvals and processing. PROFESSIONAL EXPERIENCE Land Development • Century Prestige - ±82 acres of development, including 330 single family homes with a five acre lake, and an adjacent 14 -acre tract of land. • Bluewaters - 80 -acre mix -use Single Family/Townhouse development included the design of on -site paving, grading and drainage, the design of on -site roadways including adjacent portions of SW 112`" Avenue and SW 2401h Street. • BAP developments - On -site and off-site improvements for high rise condominiums. Millennium Tower, Miami - Storm water management, roadway improvements. • Bellagio Isle, West Dade - Master planning of 640 acres multi -use development. City of Homestead - Master planning and infrastructure of Park of Commerce; water distribution and ' sewage collection system expansions on southeast section of the City. Vicenza at Hialeah Gardens - 72 acres of development, including 271 single family homes, 401 town homes, 328 apartments, a commercial tract for a strip mall, a 10 -acre charter school and two parks. Residential Land Development Projects: Las Palmas - 5 ac • Paraiso Gardens - 5 ac • Kendall Commons - 160 ac • Calusa Cove Apartment • Coral Keys Homes - 44 ac • Hialeah Palms - 114 Acres Site • Mediterranean III - Fort Myers - 80 ac • Royal Homes Villa - 20 ac • Shops at 107 - 1 ac • Hialeah Heights -21 Acres • Oak Street Townhomes Commercial /Industrial Land Development Projects: • Doral Business Park - 5 ac • Value Store it - .25 ac • Liebherr Facility — 10 ac Dr. Pepper Snapple Group — 10 ac • Turkey Point Warehouse • West Airport Business Park • Hialeah Office Building — 1 ac • Greither Holdings Warehouse — 5 ac • Tropicaire — 10 ac • Medina Palms Business Park — 1 ac Bluewaters — 84 ac South Florida Evaluation & Treatment Center — 40 ac Hialeah Heights 78 Acres Residential Splendido - 15 Acres Euro Suite - 4.5 Acres Hialeah Commercial Park - 77 Acres Vicenza - 72 ac Century Prestige - 96 ac Old Cutler Village Apartments - 23 ac Sail Cove Apartment Palms Corporate Center - 16 ac 5055 Warehouses - 4 ac Sheridans Palms Venture - .25 ac Susset Industrial Park - 2 ac Majo - West 76 Street - 2 ac Majo - Doral - 1 ac 6 -story Office Building - 2 ac Coulter Warehouse Professional Office Building - 2 ac yyyy f Al l S g7 S S ENGINEE{� R�iNG,1 C. Oliverio Sanchez, P.E. Vice President/ Sr Project Manager ri ' Roadway Design NW 138h Street and NW 97`h Avenue, City of Hialeah Annex. ' NW 97" Avenue Bridge — New roadway and overpass over SR 836. Alex Muxo Jr. Boulevard, Homestead — New roadway design. Park of Commerce Boulevard, Homestead — New roadway design. • Hialeah Roadways IV, V, and VI — Preparation of construction documents, permitting assistance and ' provide pre- construction phase support services to the City of Hialeah for the reconstruction of several existing roadways. Water and Sewer Installations • City of Hialeah, Annexation Area and water main extensions • City of Hialeah, Annexation Area • City of Hialeah, Annexation Area • Coconut Grove Metrorail Station water mains, and new 12" and 16 • St. Thomas University — Improvements to water supply system. Park of Commerce Boulevard and Homestead Motorsport Complex, Homestead — Expansion of the City's water distribution and sewage collection systems to serve both developments, including a one million gallon equalizing water elevated tank and three pump stations. - Water and Sewer Master Plan including design of 36" force main Design of 36" Transmission Water Main Design of 36" Transmission Force Main - Installation of 60" ECP water transmission line to replace 2 -42' DIP water mains. Educational Facilities • F.I.U. Sanitary Sewer Evaluation Survey Phase 111. F.I.U. Wellness Center - Civil engineering design and construction support services for the relocation of the existing utilities. • F.M.C. New Track and Field Facilities — Design of drainage and water & sewer plans. F.I.U. PH Parking Lot — Design of a new 60- vehicle parking lot, including drainage system, associated walkways and site lighting for project area. Airport Experience • Fort Lauderdale - Hollywood International Airport — Expansion and interim parking facilities. • MIA — Former PanAm Hangar and apron rehabilitation • MIA — AA baggage handing facilities at Concourse C • MIA — Building 2145 apron extension • Owens Robert International Airport, Cayman Islands, Landside Improvements ' EDUCATION B.S., Civil Engineering in 1973 University of Havana, Cuba Postgraduate course in Structural Analysis in 1979 University of Havana, Cuba Course in Airport Pavement Rehabilitation in 1993 University of Texas, Austin, Texas Miami -Dade County School Board UBCI Certification in 2001 S00151 y ENG WEERING.INC. Jean - Claude Fontaneau Project Manager _ mss. Mr. Jean - Claude Fontaneau has over 17 years of experience in civil engineering design. He has been in charge of the planning and design of a variety of municipal and site development projects. Mr. Fontaneau is primarily responsible for the engineering design and preparation of plans and specifications including the design of roadway improvements, storm drainage systems, water and sanitary sewer pipelines, pump stations and site development projects. PROFESSIONAL EXPERIENCE Mr. Jean - Claude Fontaneau's major recent responsibilities include: Roadway Design • Project Engineer responsible for overseeing the design, preparation of construction documents, plan permitting, and pre- construction phase support services to the City of Hialeah for the construction W. 36th Avenue between N.W. 138th Street and N.W. 154th Street. The total length ' of project was approximately 5,400 linear feet and consisted of a 100' wide, 4 -lane roadway with center median. The Project tasks included meeting with City of Hialeah staff and local regulatory agencies to establish design guidelines, conduct a utility search and identification of existing utilities and traffic controls, and review roadway design standards; designed and preparation of ' construction documents for the project that included the preparation of summary of quantities, roadway plan and profiles, roadway drainage, signage and marking plans, roadway lighting, MOT plan, specifications, and engineer's estimate of probable construction cost. Other responsibilities 1 included coordinating all topographical surveys and geotechnical investigations, and all environmental studies including wetland mitigation reports and preparation of ERP permit. Permitting included all applicable regulatory agencies including City of Hialeah, SFWMD, COE, DERM, and MDPWD. • Design Engineer responsible for the design, preparation of construction documents, plans permitting, and provide pre- construction phase support services to the City of Hialeah for the ' construction of W. 36th Avenue (N.W. 97th Ave) between W. 84th Street (N.W. 138th Street) to W. 76th Street. The total length of project was approximately 2,600 linear feet. The new roadway requirements included a minimum of 100' wide roadway with center median. • Design Engineer responsible for the engineering design work for Miami -Dade County Public Works Department for the widening of Miller Drive between SW 152nd Avenue and SW 158th Avenue (3,250 LF). 1 Design Engineer responsible for the engineering design work for the reconstruction of several existing local roadways within the City of Hialeah. The total length of the projects was approximately 26 miles of roadways. ' Water and Sewer Installations ' • City of Hialeah, Annexation Area — Water and Sewer Master Plan including design of 24" force main and 36" water main extensions. City of Hialeah, Annexation Area — Design of 36" Transmission Water Main and 16" Distribution Water Main along NW 97 `" Avenue to serve the Annexation Area. 1 I Jean- Claude Fontaneau Project Manager City of Hialeah, Annexation Area — Design of 24" Transmission Force Main and 6" Force Main ' along NW 97th Avenue to serve the Annexation Area. • City of Hialeah, Annexation Area — Design of Pump Station #200 to serve the Annexation Area. • City of Hialeah, Annexation Area — Design of 12" maintenance and 24" raw water mains from ' HROWTP to serve the Annexation Area along NW 102nd Avenue and NW 170th Street. Land Development ' • Century Prestige — ±82 acres of development, including 330 single family homes with a five acre lake, and an adjacent 14 -acre tract of land. • Bluewaters — 80 -acre mix -use Single Family/Townhouse development included the design of on- ' site paving, grading and drainage, the design of on -site roadways including adjacent portions of SW 112'h Avenue and SW 240`h Street. • Bellagio Isle, West Dade — Master planning of 640 acres multi -use development. 1 • Vicenza at Hialeah Gardens — 72 acres of development, including 271 single family homes, 401 town homes, 328 apartments, a commercial tract for a strip mall, a 10 -acre charter school and two parks. ■ Eureka Publix Shopping Center. Design Engineer for the design of a ±10 -acre (402 parking ' spaces) commercial shopping center development. Civil engineering design work including layout design, on -site paving, grading and drainage, water and sewer systems, stormwater management retention areas and modeling of vehicle turning movements using Autoturn. Responsibilities also ' consisted of contracting and coordinating all topographical surveys, geotechnical investigations, environmental studies and preparation of ERP permit with DERM and SFWMD. • Silver Palms Publix Shopping Center. Design Engineer for the design of a ±10 -acre (329 parking spaces) commercial shopping center development. Civil engineering design work included layout ' design, on -site paving, grading and drainage, water and sewer systems, stormwater management retention areas and modeling of vehicle turning movements using Autoturn. Responsibilities also consisted of contracting and coordinating all topographical surveys, geotechnical investigations, ' environmental studies and preparation of ERP permit with DERM and SFWMD. Industrial Facility • Design Engineer for the design of Liebheer Facility — 10 Acres. Civil engineering design work including layout design, on -site paving, grading and drainage, water and sewer systems, storm water management retention with the excavation of a lake. Responsibilities also consisted of ' contracting and coordinating all topographical surveys, geotechnical investigations, environmental studies and preparation of ERP permit with DERM and SFWMD. • Design Engineer for the design of Dr. Pepper Facility — 10 Acres. Civil engineering design work ' including layout design, on -site paving, grading and drainage, water and sewer systems, and lift station. Responsibilities also consisted of contracting and coordinating all topographical surveys, geotechnical investigations, environmental studies and preparation of ERP permit with DERM and SFWMD. • Design Engineer for the design of Greither Holdings Warehouse — 5 Acres. Civil engineering design work including layout design, on -site paving, grading and drainage, water and sewer systems. ' EDUCATION B.S., Civil Engineering in 1996 ' Florida International University, Miami, Florida Engineer Intern — Jan. 1999 - State of Florida — No. 1100004978 Gisela Rey, P.E. Structural Engineer ti Ms. Gisela Rey has more than 25 years of professional experience in design, planning and management of structural engineering projects for buildings, civil structures, and port facilities. PROFESSIONAL EXPERIENCE More than 25 years of professional experience in design, planning and management of structural engineering projects for port facilities, including docks, fender systems, harbor crane supports, wharf extensions, mega cruise ship terminals. The following list includes the most important works: Berth 24 Extension, Port Everglades, Florida — Design and construction document preparation of 500 feet length of HZ combined wall system to extend the effective length of an existing pier in order to accommodate a new cruise ship. The project included the addition of four 150 ton bollards and fender systems. Berth 28 and 29, Port Everglades, Florida - Structural analysis for HMK -260E mobile container crane operation. Structural analysis to determine the feasibility of operating mobile harbor cranes HMK -260E at Berths 28 and 29. Master Plan, Cargo Terminal, Rio Paraguay - Part of the team responsible for the design of a master plan for the Cargo Terminal at Rio Paraguay. Disney Cruise Line Resort Island, Bahamas — Part of the team responsible for the structural calculations, construction document preparation and shop drawing review for this project which included a marginal wharf, the creation of an artificial berth island, a protective breakwater, a steel bridge and several fixed timber docks and platforms for recreational activities. Port of Ensenada Master Plan, Baja California, Mexico - Part of the team for developing the Master Plan of a cruise ship terminal with three mega cruise ships, and a recreational marina for 200 boats and roadway layout for interconnectivity between the different berths and marinas. Responsibilities included dredging evaluation, structural calculations for support piers, scour analysis of pier foundations, and construction document preparation. Commercial Center, Cartagena, Colombia — Design of a commercial center at the Port of Cartagena including eight concrete buildings for retails, restaurants and business center and a pier for recreational boats. Responsibilities included the structural design and construction document preparation of all buildings and marine facilities. San Juan Terminal 4, Port San Juan, Puerto Rico - Structural calculation, design, construction document preparation, shop drawing review, coordination with the manufacturers of steel members and site inspection for the widening of the Passenger Cruise Terminal. This project included the use of steel structures for seismic conditions. Marina Costa Baja, La Paz, California — Design of a recreational marina for 315 boats from 30 feet to 90 feet of length. Responsibilities included structural calculations, piers and dock design, dredging and scour analysis, and construction document preparation as well as cost estimating. o sr Gisela Rey, P.E. Structural Engineer ' Royal Naval Dockyard, Bermuda — The project consists of a new pier of 386 x 112 feet including a two -story building, a Ground Transportation Area of 60,500 square feet for new parking and service areas including more than 550 feet of HZ combined seawall, and a two lines bridge of 300 feet length to connect the pier with the ' Ground Transportation Area. The project includes the addition of four 175 ton mooring dolphins and two breasting dolphins. Responsible for structural calculations, design and construction document preparation. Onyx Seawall Replacement, Miami, Florida — The project consists of a replacement of more than 200 feet of existing seawall with a new sheetpiling wall for a new high rise building. Responsibilities included design, and construction document preparation. ' Cypress Club, Ft Meyers, Florida — The project consists of a private marina for two high rise residential buildings, with 520 feet of sheetpiling seawall and walkways, including breakwaters and piers to accommodate 70 boats from 30 to 56 feet length. Responsibilities included structural calculation, design, construction ' document preparation and dredging evaluation. Playa Mujeres, Quintana Roo, Mexico — Design of a recreational marina for 170 boats from 46 to 120 feet of length with more than 1,600 feet of sheetpiling wall and two concrete docks for a new restaurant and an ' administrative building. Responsibilities included structural calculation, design and construction document preparation. ' Miami Circle Seawall Replacement, Miami, Florida — The project consists of a replacement of more than 540 feet of a partially collapsed seawall with a new sheetpiling wall at Archeological Tequesta Circle in Miami River. Responsibilities included design and construction document preparation. Charlottetown Port Improvements, Canada — Analysis and evaluation of the existing port capacity to accommodate the cruise lines industry including recommendations of investments in improvements to the port facility with the installation of four additional mooring dolphins with bollards 150 ton capacity. ' Isla Melons Marine Terminal, Balboa, Panama — For the new terminal near the entrance of the Panama Canal the analysis was performed for all berthing structures including the loading platforms for the tanker and barge berths, the breasting dolphins and the mooring dolphins including bollards. ' Marassi Marina, Egypt — Design of a recreational marina for 252 boats from 40 to 200 feet of length. Responsibilities included structural calculation, design and construction document preparation. EDUCATION ' Bachelor and Master of Science, Structural Engineering, Kiev Institute of Civil Engineering, Ukraine, 1981 ' Structural Engineering Advanced Graduate -level Studies, Kiev Institute of Civil Engineering, Ukraine, 1985. LICENSES 1 Professional Engineer, State of Florida, *PE 66366 (Structural Discipline) m M . f: D ®� FANDREI CONSULTING, INC. LJ Traffic Engineering Services HENRY A. FANDREI, P.E., PTOE Principal Mr. Fandrei has over 42 years of professional engineering experience, including more than 32 years here in South Florida. The vast majority of this experience has been in traffic and transportation. He has worked on projects throughout the United States and in the Caribbean Basin in both the private and public sectors as a manager and as an engineer. His background includes traffic operations, signal timing, signal systems, engineering design, traffic data collection, traffic simulation, neighborhood traffic control, planning, and environmental impact analysis of highway projects, transitlhighway interface, parking, signal warrant analysis, project management, construction supervision and traffic accident reconstruction. REGISTRATION Professional Engineer, Florida and Michigan Professional Traffic Operations Engineer, USA EDUCATION AND TRAINING MSCE - Transportation - Wayne State University BSCE - Wayne State University Traffic Signal Workshops — Georgia Institute of Technology Synchro and SimTraffic Training Courses - Trafficware Ltd. Roundabout Design - Florida Engineering Society Traffic Calming - Florida Engineering Society Designing & Operating Intersections for Safety - Florida Engineering Society PROFESSIONAL EXPERIENCE Mr. Fandrei, a Principal at FCI, is directly responsible for a variety of activities including traffic operations, traffic signal timing, design and studies, including Traffic Impact Studies and school studies. Prior to forming FCI, he was a principal with a Miami-based traffic consulting firm providing professional services to clients in areas such as traffic studies, signal system timing, traffic operations, neighborhood traffic control, engineering design and data collection. Mr. Fandrei has design experience in both traffic and civil engineering. His experience extends from intersection and roadway design in Belize; intersection design, signal design and interdisciplinary design team experience in the City of Detroit plus more than 32 years of professional experience in southeast Florida including design of traffic signals, signal system timing, signing and marking, maintenance of traffic, intersection design, transit station parking and roadway layouts. He also has experience supervising design professionals on projects ranging from traffic signal design and design of guide signs through freeway and interchange design. Mr. Fandrei has extensive experience in data collection and analyses. He has managed data collection projects for his previous employers including managing data collection operations. This work included not only supervision, but actual data collection in the field. This hand on experience in actually performing a variety of data collection types as well as organizing studies along with the strong practical traffic operations background provides an unusual combination of practical experience in technical expertise. 3 Mr. Fandrei has experience in public involvement through his background in both the public and the private sectors. Mr. Fandrei has prepared numerous traffic impact and concurrency studies for private sector clients and schools in South Florida. He was the primary engineer responsible for the transportation portion of the DRIIADA for Miami International Airport. He has been heavily involved in level of service studies in Miami -Dade County and Key West, Florida. He was involved in a comprehensive traffic and parking study for Coconut Grove in the City of Miami, Florida. He worked as a traffic engineer on the Houston transit system developing traffic assignments, analyzing traffic impacts, developing maintenance of traffic plans and reviewing contractor submittals. Before moving to Miami he was employed by the Detroit Department of Transportation where his responsibilities included traffic signal design and timing. Mr. Fandrei was the first person to utilize TRANSYT for system optimization of signals in Detroit. He also was involved in the Detroit Freeway surveillance project (SCANDI). PROFESSIONAL AFFILIATIONS Institute of Transportation Engineers - Fellow ' Council on Intelligent Transportation Systems (ITS) National Society of Professional Engineers Florida Engineering Society 01113 1 Brian S. Hathaway, PE Geotechnical Engineer Mr. Brian Hathaway is a licensed professional engineer with more than 14 years of professional experience with primary emphasis in geotechnical and civil engineering, subsurface exploration techniques, site characterization, CEI, QA/QC CMT, heavy civil construction, and construction management disciplines. Mr. Hathaway has managed and provided professional engineering services for various geotechnical and engineering construction related projects throughout Florida, Alabama, and Georgia. These projects have ranged from residential structures, commercial developments to state roadways, highways and bridges, office buildings, new schools and facilities improvements, hospitality structures, tower structures, parking garages, marine and port facilities, power and process facilities, heavy civil construction, stormwater drainage, earthen impoundment structures, filter marshes, park facilities, and landfills. The services provided by Mr. Hathaway involve all aspects of the project lifecycle including scope development, cost - estimating, subcontractor selection, project management, resource management, planning, execution, cost controls, scheduling, risk assessment, contract reviews, engineering analysis, design, and reporting. Mr. Hathaway also has valuable project experience with the operations of various in -situ testing methods and data interpretation including field instrumentation for geophysical testing methods, dilatometer, CPT, pressuremeter, seismograph monitoring, and inclinometers. Mr. Hathaway has a comprehensive understanding of soil mechanics and has laboratory experience with the performance of triaxial testing, consolidation, direct shear, CSR, and permeability testing configurations. Mr. Hathaway has provided project oversight for the design, installation, and inspection of drilled caissons, augercast piles, vibro - replacement stone columns, rammed aggregate piers (RAP), ductile iron pipe piles (DIP), driven steel pipe, and reinforced concrete piles. Mr. Hathaway has obtained certification through PDCA's Dynamic Measurement and Analysis Proficiency Test as a qualified Pile Driving Analyzer (PDA) operator. Key Projects FDOT District 4 Districtwide Geotechnical and Materials Testing Contract Florida Department of Transportation District 4, Florida Project Manager /Senior Geotechnical Engineer: AMEC performed a total of 27 task order assignments that were inclusive of geotechnical engineering, field explorations and material testing and inspection services for five counties within FDOT's District 4. Responsibilities consisted of Project Management, subcontractor management, scope development, proposal negotiations, and geotechnical engineering services and field reviews for projects that included but not limited to geotechnical explorations, miscellaneous sign structures, mast arm signalization improvements, drilled caisson installation inspections, noise barrier wall foundations, retention pond upgrades, slope stability analyses, stormwater drainage canal improvements, sheet pile stability analysis, bearing analysis for box culverts, and pavement assessment and roadway coring. Turnpike Enterprise Construction and Materials Engineering Management Florida Turnpike Enterprise, Various Locations in South and Central Florida Project Manager /Principal Geotechnical Engineer: AMEC has a task work order contract to provide geotechnical and construction materials services for the Florida Turnpike Enterprise (FTE). Responsibilities included project management, geotechnical engineering, and construction quality assurance review for laboratory _ �y WTI I Miami -Dade County Water and Sewer Department February 24, 2014 ISD Project No. E13- WASD -03 Brian S. Hathaway, PE (Continued) materials testing and inspection services on a task work order basis during the construction of road and bridge improvements of the Florida's Turnpike. The services provided under this contract consist of pile driving analyzer (PDA), vibration monitoring, field and laboratory QA/QC materials testing services, construction inspections, asphalt paving and plant QA testing, non - destructive testing, structural steel testing, and inspection services. 1 -595 Corridor Improvement Program AECOM /Florida Department of Transportation, Florida, USA Senior Geotechnical Engineer: Performed geotechnical design analysis for a segment of noise barrier walls. Performed field engineering services related to site characterization using dilatometer (DMT) insitu testing to evaluate the settlement potential for a bridge structure supported on shallow foundation system. Modifications to SR -9 U.S. Army Corps of Engineers,Tamiami, Florida Senior Geotechnical Engineer: Responsible for pile dynamic analysis verification instrumentation testing of prestressed concrete piles. Performed Quality Assurance oversight during the performance of static lateral and vertical Statnamic pile load tests and Pile Integrity Testing (PIT). WHARVES STRENGTHENING PROGRAM (WHARVES I — VII) HDR and Port of Miami, Florida Senior Geotecnical Engineer /Project Manager: AMEC teamed with HDR as the geotechnical engineer -of- record (EOR) responsible for the development of design alternatives and analyses for the Port of Miami's Wharf Strengthening Program. The dredging improvements program demanded structural integrity review of the current cargo bulkhead capacity and the stability evaluation following the future dredge of Wharves I through VII (more than 6,000 linear feet of bulkhead) located adjacent to the South Ship Channel (Fisherman's Channel). AMEC performed 18 soiVrock core borings to depths up to 110 feet and dilatometer (DMT) insitu testing in order to develop site characterization for foundation stability analysis and design. Laboratory classification, index and strength tests were performed on recovered soil rock samples. Geotechnical evaluations included lateral stability analysis and axial capacities for various deep foundation systems (prestressed concrete piles, steel pipe piles, augercast -in -place piling, drilled caissons, and soil and rock tie back anchors). The results of our analysis were presented in an engineering design report. Responsibilities included project Miami -Dade County Water and Sewer Department ISD Project No. E13- WASD -03 management, geotechnical lead, resource management, and serving as technical supervisor during field and laboratory services, engineering analyses, and reporting. Geotechnical Engineering Testing Services Contract South Florida Water Management District, Districtwide Florida Senior Geotechnical Engineer /Project Manager: AMEC provides geotechnical engineering, field exploration services, and field and laboratory construction materials testing on a Task Work Order continual service contract for the South Florida Water Management District (SFWMD). Responsibilities include contract and task order Project Management, scope and technical proposal development, subcontractor selection, technical advisor for all field exploration, drilling, and testing services, engineering evaluations and technical reporting. The projects included various sites throughout Florida, including upland, marsh /swamp, and open -water sites. Projects include explorations and analyses for storm water control structures, earthen embankments, canal widening and dredging, retaining walls, embankment stabilization, geophysical testing, well abandonment, roadway paving, telecommunication towers, mooring structures and boat ramps. Lakeside Ranch Stormwater Treatment area Phase I and Pump Station S-650 South Florida Water Management District, Florida Project Manager /Senior QC Engineer: Responsible for technical oversight and engineering compliance with construction plans and specifications during earthwork, structural, electrical and mechanical construction inspections, and construction material testing construction services. Project management services included resource management, scheduling, cost controls, financial performance, and subcontractor selection, and administration. AMEC was contracted by the SFWMD, to provide construction management, inspection, and CMT services during the construction of the Lakeside Ranch STA North and Pump Station S -650 projects. These projects are part of the State's Comprehensive Everglades Restoration Program (CERP), one of the largest environmental mitigation projects in the world representing a multi - billion dollar collaboration between the State of Florida and the USACE. The project site is located east of Lake Okeechobee and west of SR 710 (Bee Line Highway) on the boundary of Martin and adjacent Okeechobee Counties. The STA will encompass 2,700 acres and include a three - cell STA, distribution /outlet canals and water control structures. February 24, 2014 Ricardo Fraxedas, PE Environmental Engineer Mr. Ricardo Fraxedas is a Chief Engineer with 33 years of environmental engineering experience. He has an extensive background in environmental regulatory affairs and resolution of environmental issues for commercial and government clients. He has been responsible for assessments, remediation, and litigation support for a variety of industries and sites, including airports, fuel terminals, manufacturing facilities, educational facilities, and waste disposal sites in the U.S., Caribbean, and Latin America. He has authored articles and presented numerous lectures on environmental consulting, site assessments, design of remediation systems, and environmental regulatory compliance and sustainability. He has also served as an expert witness on various environmental compliance, remediation, and permitting matters and has provided review and interpretation of Latin American environmental regulations for multinational clients. Prior to joining AMEC, Mr. Fraxedas served as the head of the hazardous materials section for Miami -Dade County, Florida. In this role, he authored the county's underground storage tank regulations and industrial waste pretreatment regulations. He was responsible for the investigations and remediations of contaminated sites, including one of the first Superfund cleanups to be completed. Key Projects State School T -1 Environmental Permitting Miami -Dade County Public Schools, Florida Principal Engineer: Provided environmental permitting for a new school facility constructed in an environmentally sensitive area. Expert Witness Testimony Chartis Insurance, Florida Principal Engineer: Provided expert witness testimony at trial involving source, transport, and fate of petroleum contaminants. Testimony resulted in favorable outcome for client. Environmental, Health, and Safety Support Services Avaya, Inc., Worldwide EHS Compliance Assessor: Strategic partnership /staff augmentation consulting worldwide, providing environmental, EH &S services and support for one of the largest providers of corporate communication equipment, network cable systems, software systems, and voice /data consultation. Activities include legal /regulatory, 1 training and consulting support, and corporate auditing. Responsible for serving as EHSMS facilitator for a facility in Miami, which serves as the headquarters for the Latin American region. Environmental Compliance Services Beckman Coulter, Florida Program Manager: Provided environmental compliance services for several Miami facilities. Services included stormwater compliance, site closures, soil and groundwater cleanup, and assistance with permit applications. Environmental Compliance and Permit Assistance Boston Scientific Environmental Consulting, Florida Principal Engineer: Provided environmental compliance and permit assistance. Services provided include initial air permit and renewals for a manufacturing facility, stormwater program development, industrial wastewater permitting, and compliance program management. W M11 Miami -Dade County Water and Sewer Department February 24, 2014 ISD Project No. E13- WASD -03 Ricardo Fraxedas, PE (Continued) Off -Shore Borrow Area One Derelict Tire Removal and Disposal Broward County, Florida Project Manager: Provided project management, on- site subcontractor coordination, area inspection, and reporting for project to locate and collect derelict automobile tires from 108 acres of the sea floor less than one mile off the coast of Deerfield Beach. Used a remote sensing GPS unit with ArcView and Offshore Navigator software to direct the collecting barge along tracks transecting the area. Coordinated to minimize interference with water traffic and to establish work zone restrictions. Responsible for providing oversight of GIS -based mapping and a tire removal project as well as providing regulatory interface and interviews to news media. Stormwater Services at Fort Lauderdale International and North Perry Airports Broward County Aviation Department, Florida Project Manager: Provided stormwater management program development and compliance services for Fort Lauderdale International and North Perry airports. Services included sampling, permitting, and facility inspections. As part of the stormwater program development, services included the development of a training program and materials for the training of the operations staff at the airports as well as the development of training materials for the education of the tenants at the airports. Various Projects Chevron Environmental Management Company, Latin America and the Caribbean Principal Engineer: Services provided include ESAs, remedial system design, site remediation, and interaction with regulatory agencies in several countries. Was awarded a "Best in Class Performance" service award from Chevron in 2011. As part of the services for one of the sites in Nicaragua, a presentation to the Supreme Court in Managua (in Spanish) was provided to establish the appropriate cleanup protocol. Caxambas Park Marina Underground Storage Tank Installation Collier County Board of County Commissioners, Florida Principal Engineer: Installation of a new 10,000 - gallon UST and electronic monitoring system. Services included project management, subcontractor procurement/management, and on -site monitoring of installation process. Responsible for reviewing all engineering reports and recommending remedial strategy and action plan for client. ' Miami -Dade County Water and Sewer Department ISD Project No. E13- WASD -03 Island Transfer Station Tank Removal Environmental Testing and Reporting Collier County Board of County Commissioners, Florida Principal Engineer: Project included environmental testing, reporting, related services for removal of two USTs, and assessment of petroleum contamination at Marco Island Transfer Station. Services included preparation of site - specific Health and Safety Plan; subcontracting, planning and coordination with PSCC, FDEP, and Collier County; tank removal monitoring; installation of environmental monitoring wells; subcontracting laboratory analytical services; preparing, drafting, and submitting Tank closure and site assessment reports and a monitoring plan to the FDEP; and quarterly groundwater monitoring. Responsible for review of all environmental reports. 01 Contract Miami -Dade County Department of Environmental Management, Florida Program Manager: Services provided under the contract include all requested environmental services for all Miami -Dade County Departments. Services provided have included water quality prediction modeling for proposed alterations to the inlets of a "lagoon beach" for the Parks Department as well as numerous contamination assessments and cleanups for sites including Miami International Airport, the Port of Miami, and the Virginia Key wastewater treatment plant. Commercial Site Groundwater Remediation Design and Development DME Corporation, Florida Project Manager: Performed site remediation, involving removal and destruction of dissolved chlorinated hydrocarbons for a three -acre site. Services included quarterly and annual groundwater sampling and reporting; negotiations with local regulators and managing client risk; and system optimization. Everglades Phase I Environmental Site Assessments National Park Service, Florida Principal Engineer: Provided environmental planning services and documentation, environmental compliance services, environmental/occupational training services, waste management services, GIS and remediation services review, and input of Phase I reports for land acquisition. February 24, 2014 Eddie Abonce, PE Senior Engineer Mr, Eddie Abonce has extensive experience with the FDOT and related projects. His ability to coordinate large FDOT projects is an asset to the team when coordinating between agencies and application of the specification during plan reviews as well as the construction process. Mr. Abonce has more than 19 years of construction engineering inspection experience. He was employed by FDOT District 4 for seven years. Key Projects ' Florida Keys Overseas Heritage Trail Florida Department of Environmental Protection, Florida Senior Project Engineer /Project Administrator: Assigned to several projects involving the Florida Keys Overseas Heritage Trail that spans 106 miles from Key 1 Largo to Key West in Monroe County, Florida. The Overseas Heritage Trail in the Florida Keys consists of multi -use trails and paths. Managed CEI services for the following segments: ' o ..... ............................ .................... ............ .......... .......... ................... FDEP — CEI servo Key o .........ices ......... f ... r .. Grassy ..................... to ... Long ......... Key ..... ........................................... FDEP —CEI services for Channel 5 to Tollgate Road D...se .............-R..........................g-P.i............ ................................. ..FDEP — CEI services for Ramrod Key to Big Pine Key o............................................................................. ...........................FDEP — CEI ' services for Key Haven to Big Coppitt Key ❑ ...se ..ices ........ f . o .. r .. Bay ............. Point ... to ....... Lower ........ Sugarloa f K..............f-Key .... ...........................FDEP — CEI sery ❑ ............................................................................. ...........................FDEP — CEI services for Lower Sugarloaf Key to Summerland Key Geiger Creek Bridge Construction Engineering and Inspection Monroe County, Florida Project Manager: Construction Engineering and Inspection services for the Geiger Creek Bridge Design -Build project. Supervises inspectors and office support staff and administers client construction contacts. Responsible for financial and contract administration duties. Tom's Harbor Channel Bridge CEI 1 Monroe County, Florida Project Manager: Supervises inspectors and office support staff and administers client construction contacts. Responsible for financial and contract administration duties. Scope of project includes CEI services for the Tom's Harbor Channel Bridge 1 Repair Project, which includes include replacement of the bridge deck and guardrails, reinforced concrete beams, diaphragms, concrete columns, pile jackets, caps, and abutments. ' LAP Sidewalks City of Key West, Florida Project Manager: CEI services including project administration, daily inspection, field engineering and materials testing for four different locations throughout Key West. Supervises inspectors and office support staff and administers client construction contacts. Responsible for financial and contract administration duties. 1 Construction Engineering and Inspection Miami -Dade County Water and Sewer Department February 24, 2014 ISD Project No. E13 -WASM3 Eddie Abonce, PE (Continued) City of Key West, Florida Project Coordinator: Construction Materials Testing and Construction Engineering and Inspection for 1- mile area of roadway improvements. Supervises inspectors and office support staff and administers client construction contacts. Responsible for financial and contract administration duties. Construction Engineering Inspection Residency Consultant Florida Department of Transportation, District 6, Florida Office Engineer: Responsibilities included oversight and documentation of contractor field operations. Provided projects with independent final estimate quality assurance reviews. This included review of plan quantity checks, general ledger maintenance, statistic and control of payments using Site Manager, preparation of weekly and monthly reports, time file, weather letters, monthly and final estimate preparation, and documentation of pay quantities and as -built plans. Segments included: 12481- 1- 52 -01: SW 7th Street (Milling and resurfacing) a FEE 14688- 2- 52 -01: SW 27th Avenue (Landscaping) 16472- 1- 52 -01: Brickell Avenue (Traffic improvements) 18236- 1- 52 -01: SW 27th Avenue (Milling and resurfacing, traffic improvements) 18236- 3- 52 -01: Kendall Drive (Milling and resurfacing, traffic improvements) Flamingo Road and University Drive Florida Department of Transportation District 4, Davie Florida Office Engineer /Contract Support Specialist: Assigned to the Flamingo Road and University Drive three - project grouping. Assisted SPE /PA in preparation of supplemental agreements, change orders, work orders, time extensions, and claim analysis. Assisted in conducting pre - construction conference, pre - paving conference, and all other job related meetings. Assisted in all aspects of contract administration relating to conflict issues with citizens who were affected by project under Department's jurisdiction. Discussed project with various groups and business representatives. Broward County Project Administration Florida Department of Transportation District 4, ' Miami -Dade County Water and Sewer Department ISD Project No. E13- WASD -03 Florida Project Administrator: Assigned to several projects in Broward County for FDOT District 4. Responsibilities included exercising initiative and independent judgment in the solution of work related problems, directing and assigning specific tasks to inspectors, assisting in all phases of the construction project, and being responsible for the progress and final estimates throughout the construction projects duration. Segments included: _ ............................................. ............................... 27776- 1- 52 -01: SR -7 (US -441) (Add new through lane and turn lane, milling and resurfacing). 0 ..... ... .. ................. ............................... 27773- 1- 52 -01: SR -7 (US -441) (Safety improvements, add new lanes, milling and resurfacing). o............................................. ............................... 06515- 1- 52 -01: SR -7 (US -441) (Safety improvements, milling and resurfacing) City of Miami North Bayshore Drive Testing Services Miami, Florida Project Manager: Performed earthwork testing services,density tests, laboratory Proctor, Sieve Analysis and concrete strength tests. Responsible for coordinating project activities. 1 -595 Roadway Corridor Improvement Project Florida Department of Transportation / AECOM, Fort Lauderdale, Florida Senior Engineer: Firm is serving as Geotechnical Engineer of Record; supporting AECOM in its design build of the 1 -595 Corridor Improvements project. Improvements to 10.3 miles of multi-lane, eat -west; connector between 1 -75 from the west to just shy of 1 -95 to the east, including addition of 3 new reversible toll lanes in effort to alleviate traffic congestion, 65 new and existing bridge widening and upgrades and also improvements to existing roadways and ramps. Services include Geotechnical exploration consisting of about 2,700 supplemental soil borings and or testing and monitoring of varying depths for an approximate total 71,000 linear feet of depth and supported laboratory testing. SOUTHCOM U.S. Army Corps of Engineers, Miami, Florida Quality Assurance /Quality Control: Construction administration and quality assurance of a new military base on 55 acres and more than three buildings totaling more than 630,000 square feet. Responsibilities included daily OAS inspection, surveillance of construction contractor's quality control February 24, 2014 ® I HADONNE 3D Laser Scanning 3D Ma, Bathyn Bound: E_G t n o o r c y l F Education: Professional Surveyor and Mapper: Florida LS6006 (2000) Professional Affiliations: Land Surveyors and Mappers 3D Mappers GPS 1 GIS Services Subsurface Utility Surveyor Abraham Hadad,PSM President Senior Project Manager SUMMARY Mr. Hadad's 22 years of experience has encompassed all phases of infrastructure planning and development in Surveying and Mapping, Planning, Design, Agency Permitting and Construction Management. As a Senior Project Manager, he has provided complete project services, from program management to planning and design through permitting and construction for a diverse array of Public and Private Infrastructure projects. As a Professional Surveyor and Mapper, he has been responsible for route /right -of -way, boundary, construction, topographic, and geodetic control surveys for cellular towers, transportation projects and commercial and residential developments. Mr. Hadad's expertise in resolution of complex boundary and title problems has established him as an expert witness. Mr. Hadad's overall experience and expertise gives him the ability to trouble shoot every facet of a project from the field to the office, making him an ideal Project Manager. SELECTED RELATIVE PROJECT EXPERIENCE Miami -Dade County, Land Surveying Services for Wharf I, located at the Port of Miami, FL, from September to October 2009: Miami -Dade County- Port of Miami Ms. Leonor Ortega — Tel: 305. 347.48921 E -Mail: lortega @miamidade.gov POM Project No.:2009.028.02 Provided Topographic Survey and prepared a Map of Topographic Survey of existing ground under existing Wharf I. Wharf I is about 850' long by 85' wide. The topographic survey was to develop a TIN file of the ground surface under the wharf and extend water -ward about 30' beyond the face of the wharf. The survey also included the location of 15 -20 geotechnical borings on the top side of the wharf and the approximate location of 5 sections of existing dp -rap located within the project area. The topographic survey entailed tasks establish Horizontal Control relative to NAD83/2007 and Vertical Control relative to NAVD88. Control stations to be established at +/- 1000' intervals and placed in locations not subject to construction and able to be verified/ utilized during construction. Created a grid based on the location of all existing piles supporting the wharf as necessary to delineate existing ground conditions. The same methodologies were used to determine horizontal location and elevations for geotechnical borings and limits of rip -rap. United States Dept. of the Interior, National Park Services, Everglades National Park, FL, from 0612010 to 0312011 United States Dept. of the Interior, National Park Services Prime Eng. Consultant: PAC COMM Inc. 8 - Mr. David Juelle Tel: 305. 381.5157 E -Mail: dj @paccominc.com Replace two (2) Failed Plugs (Dames at Cape Sable (East of Cape and Homestead Dams, EVER - 152464 with the United State Department of the Interior, National Park Service. Establish Horizontal and Vertical Control Points and layout work limits at the East Cape Canal and Homestead Canal Dam locations, and confirm the proposed locations at all topographic, construction, or other items affecting the work. Established line and grade and installed offsets of the proposed steel sheeting structures at the East Cape Canal Dam locations. Installed temporary markers, for the wood channel marker piling, in Lake Ingraham. Pedodic on -site survey as needed, including but not limited to layout of the proposed mooring piles, walkway, gangway, and final grade elevations. Miami - Dade -DERM, Survey of Lake and Canal Outfalls, Multiple Sites (E09- 13W-01): from 0112011 on going. Department of Environmental Resources Management, Water Management Division Provided Land Surveying and Mapping Services. Performed location and As -Built of Outfalls and Culverts on several locations determined by DERM. Performed reconnaissance of the assigned area. Established Horizontal 8 Vertical Control. HADONNE delivered a GIS Data Base Paoe 1 of 2 RADON N E 1 1985 NW 88th Court • Suite 202 • Doral, FL. 33172 - ph.: 305.266.1188 - fax: 305.207.6845 - vnva.hadonne.com • LB7097 ® HADONNE Land Surveyors and Mappers 3D Mappers GPS I GIS Services Subsurface Utility Surveyor Abraham Hadad,PSM President Senior Project Manager Miami -Dade Public Works Department, SW 27th Avenue from US1 to Bay Shore Drive, Miami Florida, from 0212006 to 0212008. Miami -Dade County/Public Works Department/Highway Division 111 NW 1st Street 16th Floor, Miami, Florida 33128 Mr. Carlos Socarras, PLS Tel: 305- 375.2095 E -Mail: carso @miamidade.gov Boundary. Topographic, 8 Specific Purpose Survey for Miami Dade County Public Works Right of Way Division. Provided location of all visible fixed improvements Wthin project limits, including roadway pavement, driveways (type of driveways), sidewalks, walkways, mailboxes, fences, trees (including trunk diameter), etc. Provided locations of all visible above ground utilities. Invert elevations for existing storm water and sanitary manholes, and/or existing inlets and catch basins. Right -of -way lines from Plats for SW 27th Ave and all cross streets. Town of Medley Flood Mitigation Project: Right of Way Mapping and Topographic Survey of over 36,000 L.F. of Section 4.53.40, lying Southwesterly of the F.E.C. Rail Road in the Town of Medley, from 0512006 to 0812008 Town of Medley Melvin Wolf Esquire 7331 NW 74 Street Medley Florida 33166 Email: medley @bellsouth.net Map of Topographic Survey at NW 106 Street to NW 89 Street, Town of Medley.: Right of Way within Miami -Dade County Right of Way Division and Town of Medley, established right of way lines area. Located all visible fixed improvements, within the right of way, including roadvray pavements, driveway, sidewalks, poles, walkways, mailboxes, fences, trees (including trunk diameter), water meters, etc. Located all above - ground utilities. Town of Medley, Storm Drainage Inventory, of all structures within the entire Town of Medley, from:1112010 On Going Town of Medley Utilities Dept. 10776 N.W. South River Drive, Medley, Florida 33178 Mr. Jorge C. Soto Tel: 305.889 -1915 Ext. 224 E -Mail: lsoto(cDtown of med ley.co m Prepared a Storm Drainage Atlas of all structures. Establish an inventory of all existing Public ROW, located all Storm Drainage Structures within the ROW. Located all structures Horizontal and Vertical, with Horizontal coordination, Rim Elevation, Bottom Elevation 8 photographs of the exterior condition of the structure. NW 42 Avenue Bridge Replacement, Miami Dade County DesignBuild ITB #10.11.001City of Miami Gardens, FL, from 0912011 to present City of Miami Gardens Prime Consultant: Metric Engineering, Inc. Mr. Oscar J. Cruz, P.E. Director of Structures Design Services 13940 SW 136 Street, Suite 200 Miami, FL 33186 Tel. 305 - 235 -5098 Provided Horizontal Control Survey, setting PNC along the project Route in addition to all Street Intersection. Vertical Control Survey, setting PNC along the project Route in additional to all Street Intersections, 2nd Order Level Run 3 Wire readings. Right of Way Reconnaissance, performed a full Topographic Survey of the full Right of Way along the project corridor, with Trees and Traffic Stripping. Took As -Built information of all Drainage Structures and Sewer Structures, Canal Soundings, Detailed Bridge Survey- location of all Pile Caps and measurements Page 2 of 2 H A DO N N E 1 1985 NW 88th Coun -Suite 202 - Doral, FL. 33172 - ph.: 305.266.1188 -fax: 305.207.6845 • v .hadonne.00m - L87097 ® I HADONNE Areas of Expertise: Construction Surveys Control Surveys Route Surveying Roadway Design Surveys Boundary Surveys Topographic Surveys FDOT Survey Services Computer Applications Electronic Data Collection Education: Attended Miami -Dade Community College Professional Registration: Professional Surveyor and Mapper: Florida LS6099 (2000) Professional Affiliations: Florida Surveying and Mapping Society (F.S?M�SJ Miami -Dade County Chapter of F.S.M.S. Land Surveyors and Mappers 3D Mappers GPS 1 GIS Services Subsurface Utility Surveyors Raul Izquierdo, PSM Vice President Senior Project Manager SUMMARY Mr. Izquierdo has practiced land surveying for over 28 years and has participated in many aspects of land surveying. He has both field and office survey experience and has acted in the role of Project Surveyor for the past 19 years. His experience includes boundary, topographic, FDOT Survey Services, route surveying, roadway design surveys and construction surveys. Mr. Izquierdo's experience has encompassed all facets of surveying and mapping. His office and field expertise allow him to troubleshoot and perform as a problem solver making him an excellent Project Surveyor. SELECTED RELATIVE PROJECT EXPERIENCE NE 87 Street from NW 2 Avenue to Farm Road and along N Miami Avenue, City of El Portal, FL:, from 0212011 to 0512011 New Millennium Design Consultants, Inc.. Ena Hernandez, P.E. 305.667.4772 4868 SW 72nd Avenue Miami, FL 33155 Provided Horizontal and Vertical Control Survey, Topographic Survey, Digital Terrain Model (DTM). Served as Project Surveyor. Miami -Dade Expressway Authority (MDX) Contract RFQ -09.07 CEI for SR 924 (Gratigny Expressway), SR 874 (Don Shula Expressway) & SR 878 (Snapper Creek Expressway) Infrastructure Modification for Open Road Tolling, Miami, FL, from 0512008 to 1012009 American Engineering & Development Corporation 11765 West Okeechobee Road Hialeah Gardens, FL 33018 Tel: (305) 825.9800 Establish Hodzontal, Vertical and Baselines, along with field verification for all layouts and As- Builts. Served as Project Surveyor. E07- WASD -07A Design of Distribution of Pipeline for Reclaimed Water System from Central District Wastewater Treatment Plant to Key Biscayne, Miami, FL, from 0812008 to 1012009 Lockwood Andrews & Newnam Rodrigo Pigna (305) 4446454 3390 Mary Street, Coconut Grove, FL 33133 Provided Topographic Survey, Show all improvements from Right-of-Way to Right -of -Way, Establishing Hodzontal and Vertical Control for future construction, Cross sections (spot elevations), All utility information provided, Bathymetric survey Bear Cut Channel. Served as Project Surveyor. H ADO NNE 1 1985 NW 88th COUn -Suite 202 - Doral, FL. 33172 -ph.: 305.266.1188 -fax 305.207.6845 • v .hadonne.com - LB7097 ® I HADONNE City of Miami Glenroyal Corridor 0112010 Corzo Castella Carballo Attn: Daniel Grandal (305)445.2900 901 Ponce de Leon Blvd., Suite 900 Coral Gables, Florida 3313 Land Surveyors and Mappers 3D Mappers GPS 1 GIS Services Subsurface Utility Surveyors Drainage Improvements, Miami, FL, 0812008 to Topographic Survey, Established vertical and horizontal control for future construction, All utility information provided, Cross sections (spot elevations), Tree information, All improvements shown from Right -of -Way to Right -of -Way. Served as Project Surveyor. Drainage & Improvements Project of area between NW 22 Ave - Flagler St - NW 17 Ave - SR836, Miami FL: Drainage & Improvements Project of area between NW 22 Ave - Flagler St — NW 17 Ave — SR836. Served as Project Surveyor. City of Miami Beach Capital Improvements Miami Beach, FL, from 0212007 to 0812007 APCT Engineers Eithel Sierra 305.592.7283 10305 NW 41 Street, Suite 115 Doral, Florida 33178 Project Neighborhood No. 7 Nautilus, Topographic Survey, Established vertical and horizontal control for future construction, All utility information provided, Cross sections (spot elevations), Tree information, All improvements shown from Right -of -Way to Right -of -Way. Miami -Dade Water & Sewer Department (WASD) 72 -Inch Raw Water Pipeline (E06- WASD -06) (5 miles), Miami, FL, 0712007 to 0512008 Lockwood Andrews & Newnam Rodrigo Pigna (305) 4446454 3390 Mary Street, Coconut Grove, FL 33133 Provided Topographic Survey along NW 58 Street between NW 72 Avenue and the Florida Turnpike Homestead Extension, Established vertical and horizontal control for future construction, All utility information provided, Cross sections (spot elevations), All improvements shown from Right -of -Way to Right -of -Way. 1.751SR826 PD & E Study from NW 103 St to No.: 420669.1.22.01): from 1212007 to 1012010 The Corradino Group Attn:Favio Laverde 305. 5940735 4055 N.W. 97th Avenue Doral, Florida 33178 Miami - Dade /Broward County Line (FM 10 miles) Topographic Survey / -Show all improvements from Right -of -Way to Right -of -Way I Establishing Horizontal and Vertical Control for future construction / Set Aerial Targets for Photogrammetry Control / Cross Sections (spot elevations HADONNE 1 1985 NW 88th Court -Suite 202 - Doral, FL.33172 - ph.:305.266.1188 -fax: 305.207.6845 • v .hadonne.com - LB7097 ® I HADONNE Areas of Expertise: : Right- of-Way Mapping > Platting Construction Surveys Control Surveys Route Surveying Roadway Design Surveys Boundary Surveys Topographic Surveys Computer Applications Electronic Data Collection GPSIGIS Education: Attended University of Camaguey, Cuba Attended Miami -Dade Community College Professional Registration: Professional Surveyor and Mapper: Florida LS5938 (1999) Professional : Affiliations: Florida Surveying and Mapping Society fivs! S.) Miami -Dade County Chapter of F.S.M.S. Land Surveyors and Mappers 3D Mappers GPS 1 GIS Services Subsurface Utility Surveyors Jose Selias, PSM QA I QC Officer Project Surveyor SUMMARY Mr. Senas has practiced land surveying for over 28 years and has participated in many aspects of land surveying. He has both field and office survey experience and has acted in the role of Project Surveyor for the past 17 years. His experience includes boundary, topographic, FDOT Survey Services, route surveying, roadway design surveys and construction surveys. Mr. Senas offers a broad spectrum of knowledge and expertise and specializes in Quality Assurance and Quality Control. Mr. Senas has the innate ability to review a survey methodically and provide a sound and technical review of all the survey data. SELECTED RELATIVE PROJECT EXPERIENCE FDOT District Vi, Golden Glades Interchange Pd &E Study, From Sr 826 (Palmetto Expressway) Eastbound To Sr 9a 11.95 Northbound, Miami, A (0412011 - 0212012): Corzo, Caslella, Carballo, Thompson And Salman (C3ts) Mr. Robert Carballo Address: 901 Ponce De Leon Blvd., Suite 90 Coral Gables, Florida 33134 305. 445.2900 Carballo(a),C3ts.Com (Various corridors) horizontal and vertical control survey, alignment and existing rAv lines, aerial targets, drainage survey, geotechnical support, and boundary survey. Served as project surveyor. Prime - consultants: cats, mr. Robert Carballo, 305445 -2900. Miami -Dade Public Works Department, SW 27th Avenue from US1 to Bay Shore Drive (0212006 — 0212008): Miami -Dade County/Public Works Department/Highway Division 111 NW 1st Street 16th Floor, Miami, Florida 33128 Mr. Carlos Socarras, PLS Tel: 305. 375.2095 E -Mail: carso @miamidade.gov Provided Boundary, Topographic, & Specific Purpose Survey for Miami Dade County Public Works Right of Way Division. Provided location of all visible fixed improvements within project limits, including roadway pavement, driveways (type of driveways), sidewalks, walkways, mailboxes, fences, trees (including trunk diameter), etc. Provided locations of all visible above ground utilities. Invert elevations for existing storm water and sanitary manholes, and/or existing inlets and catch basins. Right -of -way lines from Plats for SW 27th Ave and all cross streets. Ref. Miami Dade Public Works Dept., Mr. Luis Lacau, 305- 375 -5774. NW 42 Avenue Bridge Replacement, Miami Dade County Design /Build ITB #10.11.001 City of Miami Gardens, FL, from 0912011 to present City of Miami Gardens Prime Consultant: Metric Engineering, Inc. Mr. Oscar J. Cruz, P.E. Director of Structures Design Services 13940 SW 136 Street, Suite 200 Miami, FL 33186 Tel. 305. 235.5098 Provided Horizontal Control Survey, setting PNC along the project Route in addition to all Street Intersection. Vertical Control Survey, setting PNC along the project Route in additional to all Street Intersections, 2nd Order Level Run 3 Wire readings. Right of Way Reconnaissance performed a full Topographic Survey of the full Right of Way along the project corridor, with Trees and Traffic H ADO NNE 1 1985 NW 88th Court -Suite 202.Octal, FL. 33172 -ph.: 305.266.1188 -fax: 305.207.6845 -w .hadonne.com - L67097 ® I HADONNE Land Surveyors and Mappers 3D Mappers GPS 1 GIS Services Subsurface Utility Surveyors Stripping. Took As -Built information of all Drainage Structures and Sewer Structures, Canal Soundings, Detailed Bridge Survey- location of all Pile Caps and measurements NE 87 Street from NW 2 Avenue to Farm Road and along N Miami Avenue, City of El Portal, FL:, from 0212011 to 0512011 New Millennium Design Consultants, Inc.. Ena Hemandez, P.E. 305.667.4772 4868 SW 72nd Avenue Miami, FL 33155 Provided Horizontal and Vertical Control Survey, Topographic Survey, Digital Terrain Model (DTM). Served as Project Surveyor. Miami -Dade Expressway Authority (MDX) Contract RFQ -09.07 CEI for SR 924 (Gratigny Expressway), SR 874 (Don Shula Expressway) & SR 878 (Snapper Creek Expressway) Infrastructure Modification for Open Road Tolling, Miami, FL, from 0512008 to 1012009 American Engineering & Development Corporation 11765 West Okeechobee Road Hialeah Gardens, FL 33018 Tel: (305)825.9800 Establish Horizontal, Vertical and Baselines, along with field verification for all layouts and As- Builts. Served as Project Surveyor. E07- WASD -07A Design of Distribution of Pipeline for Reclaimed Water System from Central District Wastewater Treatment Plant to Key Biscayne, Miami, FL, from 0812008 to 1012009 Lockwood Andrews & Newnam Rodrigo Pigna (305) 4446454 3390 Mary Street, Coconut Grove, FL 33133 Provided Topographic Survey, Show all improvements from Right -of -Way to Right -of -Way, Establishing Horizontal and Vertical Control for future construction, Cross sections (spot elevations), All utility information provided, Bathymetric survey Bear Cut Channel. Served as Project Surveyor. City of Miami Glenroyal Corridor Drainage Improvements, Miami, FL, 0812008 to 0112010 Corzo Castella Carballo Attn: Daniel Grandal (305)445.2900 901 Ponce de Leon Blvd., Suite 900 Coral Gables, Florida 3313 Topographic Survey, Established vertical and horizontal control for future construction, All utility information provided, Cross sections (spot elevations), Tree information, All improvements shown from Right -of -Way to Right -of -Way. Served as Project Surveyor. Drainage & Improvements Project of area between NW 22 Ave - Flagler St - NW 17 Ave - SR836, Miami FL: Drainage & Improvements Project of area between NW 22 Ave - Flagler St — NW 17 Ave — SR836. Served as Project Surveyor. H ADO NNE 1 1985 NW 88th Court -Suite 202 - Doral, FL. 33172 • ph.: 305.266.1188 -fax 305.207.6845 - www.hadonne.00m - LB7097 I Approach and Methodology APPROACH AND METHODOLOG SRS Engineering, Inc. (SRS) approach is to provide the City with a level of services expected of a quality firm. Our services should produce designs that are not only feasible but also economical and functional. Our obligation to the City is to represent it's best interest during each stage of a project whether it is in the due diligence and design stages or the construction phase of a project. We strive to deliver innovative engineering solutions and outstanding customer service. Since our inception in 1995, SRS has been dedicated to building an outstanding team of engineers and professional staff whose technical expertise and client relations skills are among the best in the industry. SRS' engineers and professional staff are supported by state -of- the -art technology, including proprietary software programs that the company has developed to provide customers with innovative solutions. Deadlines and cost controls are managed with the same precision applied to the solution of engineering problems giving SRS a strong competitive advantage in the area of operations. In addition to our focus on excellence in design and service, our firm is guided by principals who understand that in order for the firm to succeed it must have satisfied clients. As a result, SRS's success is largely due to the principals' strong commitment to its clients and the quality of our work. Principals at SRS are involved in every aspect of the project. Project management and contract performance is personally directed by a principal who is a thoroughly experienced, licensed professional engineer. This approach results in a very personalized service to every client with ease of communication and top talent on every assignment. The efforts of SRS' principals are complemented by experienced project engineers and talented professional staff that are adept at understanding clients' needs and will work hard to deliver the results that the City's requires. We value our commitment to the City and if given the opportunity to work for the City of Sunny Isles Beach, the SRS Team is committed to meeting its assignments, project requirements and schedules. SRS has the capacity and resources needed to meet your needs. We are accustomed to designing and managing small, as well as, large and complex projects. SRS is a full service civil /environmental and structural engineering consulting firm delivering innovative engineering solutions and outstanding service to its clients in the public and private sectors. The company offers a wide array of engineering and construction services ranging from residential and commercial site development to municipal public works and infrastructure projects. We are experienced in the design of site development, roadways, drainage systems, water and sewer systems, pump stations, parking lots, recreational facilities, marine systems and facilities, and environmental engineering. Our firm is further supported by an excellent group of consulting professional firms whose unique expertise and experience with similar municipal projects makes our group an exceptional team. Our combined strengths and capabilities will ensure the City that it's projects are completed in a successful and timely matter. SRS has garnished a reputation for quality work, client service, dependability, and integrity. These founding principles have fostered a reliable base of loyal clientele and devoted and passionate employees. Our company's philosophy is to provide our clients with a level of services needed to bring projects to a completion meeting the requirements of our client. We will strive to deliver EN pINEERING,INC. I Approach and Methodology 1 innovative engineering solutions and resolutions to problems, if they arise, in a quick and effective manner. As Project Managers, Design Engineers and Construction Managers, SRS has a thorough understanding of the many facets of a project, not only from the designer's point of view but also that of the contractor. We know regulatory requirements and are very familiar with local staff and their standard. We often can a see a problem coming ahead of time and can work to avoid it. We are confident that if our Team is selected for this contract, we will execute the contract in a professional, efficient and successful manner in cooperation with the City and regulatory agencies. SRS has managed numerous similar municipal projects and has extensive experience providing miscellaneous engineering services to local municipalities, including Hialeah, Miami, Coral Gables, South Miami, Homestead, North Miami Beach and other local governments. Our firm has a thorough understanding of the work to be done as Engineering Consultants to the City. We have successfully provided similar services to many local municipalities and governmental agencies. We are very familiar with their particular standards and requirements. We also have the staff and resources required to meet the City's needs. We have been providing engineering design and construction management services for over 18 years. We have extensive experience providing services to municipalities. Currently, we are under contract to provide continuous miscellaneous services to the City of Hialeah, City of Miami, City of South Miami, City of Homestead, Naranja Lakes CRA, and the State of Florida Department of Military Affairs. In the past, we have contracted to provide continuous miscellaneous engineering services to the City of Miami, City of Coral Gables, City of Homestead, City of North Miami Beach, Miami -Dade Water and Sewer Department, Miami- ' Dade Parks and Recreation Department, DERM, and FIU. Recent projects include new roadways, drainage improvements, water and sewer pipelines and pumps stations, environmental studies, master planning, municipal buildings and parking areas, parks and recreational facilities, and construction administration services and construction inspections. Please see enclosed Relevant Experience for additional information on projects completed by SRS. SRS has an excellent record of performance which is evident by our long and continuous list clients. We have always strived to provide our clients with the very best service and quality in our work product, and as a result, we have been fortunate to have garnished a devoted and loyal list of clients who continuously contracted our services. Among these clients includes several prominent local developers (Codina, Century, Prestige Builders, Shoma), TD Bank, Publix, FPL, FIU, FMU, UM, and local governments including Cities of Miami, Coral Gables, Hialeah, Homestead, Sweetwater, Miami Beach, MDWASD, RER (DERM), MDCPS, and MDCPW. Please see enclosed copies of Client Recommendation and Evaluations for additional information on projects completed by SRS. e•- u ENGINEERING.INC. References o Mr. Jorge M. Fernandez, Jr., Coordinator, Incorporation, Annexation and Municipal Services ' Miami -Dade County, Office of Strategic Business Management 111 NW 151 Street, Miami, FL 33128 Telephone: 305 - 375 -1543 Fax: 305- 372 -6089 Email: jjorge @miamidade.gov ' 2007 — PresentTotal Contracted Amount $208,000 CRA Construction Consultant providing Construction Administration and Inspection Services ' o Mr. Jorge Hernandez, Director City of Hialeah, Streets Division 5601 E. 81' Avenue, Hialeah, FL 33013 Telephone: 305 - 687 -2611 Fax: 305 - 687 -2632 Email: JEHernandez @hialeahfl.gov ' 2004 —2005 Total Contracted Amount $3,618,168 Design of roadway and drainage improvements project throughout the City (various locations). ' o Ms. Lydia Salas, Construction Manager 11, Project Management Div. Miami -Dade Parks & Recreation Dept. 275 NW 2nd Street, 4th Floor, Miami, Florida 33128 ' Telephone: (305) 755 -5456 Fax: (305) 755 -7995 LydiaS @miamidade.gov 2007-2011 Total Contracted Amount $55,818 Engineering design, permitting and construction phase services of a pedestrian /bike path, access road, parking areas, and canoe ramp. rr • ' a Mr. Dorian Valdes, (Formerly with Miami -Dade County, D.E.R.M. CB &I Environmental & Infrastructure, Inc. 14350 Commerce Way, Miami Lakes, FL 33016 Telephone (305) 818 -2642 Fax: (305) 231 -7401 dorian.valdes @cbi.com 2001 —2006 Total Contracted Amount $4,500,000 Administration of FEMA/DORM Project — Master Consultant for 490 roadway restoration and drainage replacement projects. ' o Mr. Antonio Cotarelo P.E., Asst. Director Miami -Dade County, Public Works Dept., Construction Division ' 111 NW 1st Street, Suite 1420 — Miami, Florida 33128 Telephone: 305- 375 -1918 Fax: 305- 375 -2547 Email: cotara @miamidade.gov 2006 —2007 Total Contracted Amount $745,000 CEI Services for roadway and drainage improvement projects for MDCP W and DERM. Mr. Ernesto R. Pino, R.A., Assistant Director City of Coral Gables, Public Works Department 2800 SW 72nd Avenue, Miami, FL 33155 Telephone: 305 - 460 -5004 Fax: 305 - 460 -5080 Email: epino @coralgables.com 2007 — PresentTotal Contracted Amount $65,500 Miscellaneous Civil Engineering Services on a continuing contract MIAMI -DADE PARK & RECREATION DEPARTMENT January 5, 2011 Re: Miami Dade Park and Recreation Department ' Chapman Field Park Phase I Development Project To whom it may concern: This letter serves to certify that SRS Engineering Inc. was contracted as the Civil Engineering sub - consultant to the Architect of Record, and as the Engineer of Record, has successfully completed the design of a Canoe/Kayak Launching Pier and Bike/Pedestrian Path to serve Chapman Field Park, SRS was responsible for the engineering related to geometry, paving, grading, drainage, pavement marking and signage for the following scope elements: Parking lot, Improvement of existing dirt road, I mile Trail, and a Bridge allowing canoe access across waterways. SRS met all the design requirements of this project in a timely and efficient manner. This project is currently under construction and is scheduled to finish by Jan/15 /2011. If you have questions, please contact me at 305 755 -5456. Sincere y;f Lydi . Salas, Construction Manager II Project Management Division. cc: Maggie Tawil, P.E., Project Management Division Chief - MIAMI= PARKS Miami -Dade County _NP ®. Park & Recreation Department 275 NW 2 °d Street, 4" Floor t \® Miami, Florida 33128 MIAMI -DADE PARK & RECREATION DEPARTMENT January 5, 2011 Re: Miami Dade Park and Recreation Department ' Chapman Field Park Phase I Development Project To whom it may concern: This letter serves to certify that SRS Engineering Inc. was contracted as the Civil Engineering sub - consultant to the Architect of Record, and as the Engineer of Record, has successfully completed the design of a Canoe/Kayak Launching Pier and Bike/Pedestrian Path to serve Chapman Field Park, SRS was responsible for the engineering related to geometry, paving, grading, drainage, pavement marking and signage for the following scope elements: Parking lot, Improvement of existing dirt road, I mile Trail, and a Bridge allowing canoe access across waterways. SRS met all the design requirements of this project in a timely and efficient manner. This project is currently under construction and is scheduled to finish by Jan/15 /2011. If you have questions, please contact me at 305 755 -5456. Sincere y;f Lydi . Salas, Construction Manager II Project Management Division. cc: Maggie Tawil, P.E., Project Management Division Chief - Strategic Business Management 111 NW 1st Street • 22nd Floor M I A M I•DADE Miami, Florida 33128 -1994 • T 305- 375 -5143 F 305 - 375 -5168 miamidade.gov ADA Cmrdinalion Agenda Conrdinawn Animal Services M in Public Places Audit and Management services January 24, 2011 A,ia,inn Building Building Cade Compliance Business Development Capful lmprwements To whom it may concern: Ctiaeni Independent Tram nation Trust Comm&smn on Ethics and Public Trust This letter is to attest that SRS Engineering, Inc. and its President, Mr. Ignacio Serralta `°"""'"'ate" have outstanding services to the Naranja Lakes Community Redevelopment `°'"'"""I"A`t""Agency provided Agency in his capacity as a Construction Consultant during the Agency's Cwnmmilg6ECC implementation of Phase One of the Mandarin Lakes Redevelopment Project. c.utyRel.t., Community Relations Consumer Smites Corrections 6 Rehabihutim At an approximate cost of ten million dollars, Phase One of the Mandarin Lakes Cultural Artain nettim, Redevelopment Project consisted on multiple infrastructure improvements in an area Emerged Management devastated by Hurricane Andrew in 1992. The project also incorporated the first EmplaeeRelatims Traditional Neighborhood District Zoning adopted by Miami -Dade County Board of Empow- ermentTmst County Commissioners. Enterprise Technology Services Env =menial Resources Managemenl W'° "'"' " "` Throughout the past three and half years, SRS Engineering, Inc. has displayed "a"Ce exceptional management and oversights abilities with the completion of the various Fire Rescue construction items that were part of the initial phase of this redevelopment project. Mr. CMeral Services Adinitu ation Serralta and his staff are utmost professionals, diligent and detailed oriented. I was HiuciHc Pneu, tiro Honheless Trust most impressed by his accessibility and responsiveness to complex inquiries from staff, Housing Agency and the Agency's Board members. Housing finance Authority Human services Independent Re.; Panel It would be an utmost pleasure to have an opportunity to work with him again in a future lntemational Trade Cunoium endeavor. IuKnde Senire, 1 .Medial Examiner .Metomiami ACtim Plan Sincerely, Metropoliun Planning D gani=ion Pork and Recreation Planning and Zoning Police Pmc "cement Mamgement Jorge ernandez, Jr. Coordinator Popem. p"ai l Co munity Redevelopment and Municipal Services Public Library Ssstem Public %VOrla sate Neighbodwod Pans seaport Will %Vave.Managemenl strategic &ninaea MarugesMl Team., tlo Transit �k Force on Vrban Economic Reviuli Cation Viizc Museum And Gardens / / 7 / 7�efrti'e� � I�,fca 7)a�, ; a „1 iYCC- . waver 8 Sewer � J MIMI ®DADE: 1 1 ADA Coordlmdon Agenda Coordination Art In Public Place. 1 Audit and Management Services AA.U.n Building Code Compllance Building Business Deselopnent Capial Imprmemerts 1 Citizen's Independent TanslMallon Tmn Commurir d., CIXnmunny Acim Agency Community S Ecc narnic Deselopnent Community Relations Consumer ienices Co cns 6 Rehabilmuon Countywide H®Ithare Planning Cultural AHalns Elections Eme,gecy Management Employee Relations Enterprise Terhndogy Sesices EmimnmeNal Resource Management Fair Employment Practices Finance Fire Resale 1 General Sa ices Administration Wsloric Presevztion Homeless Trust Housing Agency Housing Finance Authority Human Sevice Indepeclent Resiew Panel International Trade Consortium lusenile Assessment Carter Mediol Examine t Meropditan Planning organization Park and Recreation Planting and Zoning Police Procurement Management Pmpeny Appraise Public Library System Public works Sale Neighborhood Parks Seaport ' Solid wane Management Strategic Belness Management Team Mew Tnanst Urban Resilalizatim Task Force Yzoya Mtnean and Gardass Water and $ewer Department of Environmental Resources Management Division of Recovery and Mid ation 33 SW 2nd Avenue, 3rd Floor Miami, Florida 33130 -1540 T305-372-6970 F 305- 372 -6459 miamidade.gov August 10, 2005 Mr. Ignacio Serralta President Serralta, Rebull, Serig 14160 Palmetto Frontage Road Suite 22 Miami Lakes, Florida 33016 RE: FEMA Restoration Projects Dear Mr. Serralta: For the past three and a half years, your company has contributed to the management of one of the most ambitious engineering projects ever accomplished in Miami -Dade County. From the inception, your professionalism, dedication, and hard work were evident. Although we were embarking on a very complex project, in coordination with multiple agencies and with tight deadlines, your company consistently delivered a quality product while remaining within budget limits. With your committed effort and support, this massive project was completed under budget and ahead of schedule. This Department, especially the members of the "DORM Team ", applauds your firm for a job extremely well done, and we look forward to maintaining our professional relationship. Sincerely, a�� )� .dm� Dorian K. Valdes, P.E., Chief Division of Recovery and Mitigation cc: John W. Renfrow, P.E., DERM Carlos Espinosa, P.E., DERM Eduardo A. Vega, P.E., DORM Mercedes Barreras, DORM 1 1 tl.. 1 6. •�� p W N �dPOA* E 1 Julio Robaina Mayor 1 Esteban Bovo Council President 1 Eduardo Gonzalez Council Vice - President 1 Council Metnber Jose F. Caragol Luis E: Gonzalez 1 Carlos Hernandez Cindy Miel Jose Yedra E 3 Armando Vidal, P.E. 1 Director City of Hialeah Department of Water & Sewers January 19, 2006 RE: City of Hialeah Sewer Purnp Station No. 200 To whom it May Concern: This letter is to certify that SRS Engineering, Inc. as consultants to the City of Hialeah were contracted to design a new regional sewer pump station to serve the newly annexed area of the City. The design is for a large sewer pump station capable of handling 8.06 MGD. The pump station will be the largest in the City of Hialeah consisting of a two -story wet well/dry well building with four 470- horsepower pumps, ' electrical control systems, telemetry and backup generator with a fuel tank. The project also includes the design of the pump station site area and approximately 2,800 If of 36 -inch sewer force main; 10,600 If of-24-inch sewer force main and approximately 1 j500 If of 30 -inch gravity sewer main. SRS has met all the requirements of this project in a timely and efficient manner. Please feel free to contact me with any questions. 1 Sincerely, '� 1 Jose Rodriguez P.E. Engineering Coordinator JR: mn cc: Armando Vidal, P.E. Director 1 1 ' 3700 W. 4TH AVENUE • HIALEAH, FLORIDA 330124298 TELEPHONE: (305) 556 -3800 1 RFQ No. 2012 -10 Continuing Contract for Professional Services 6.3 REFERENCE QUESTIONNAIRE It is the responsibility of the contractortvendor to provide a minimum of five (5) government agency references other than North Miami Beach using this form and providing this information with your submission. Failure to do so may result in the rejection of your submission. Giving reference for: (Bidder): SRS Engineering Inc Firm giving Reference: Miami Dade County Parks Recreation and Open Spaces Department Address: 275 NW 2� ST. Miami, FL, 33128 Phone: (305) 755 -5453 Fax: (305) 755 -7995 Email: JArango(")a miamidade.gov 1. Q: What was the title of the contract or job assigned to Bidder? A: Chapman Field Park New Pedestrian/Bike Paths and Parking Lot ' 2. Q: What was the scope or work/services assigned to Bidder? A: SRS was the Civil Engineer of Record for the project (working for the Architect). The project consisted ' of the construction of a pedestrian/bike path, access road, canoe ramp, and parking lot. 3. Q: What was the dollar value of the contract? A: The total construction cost was 51,721,270.25 (inclusive of change orders) 4. Q: Have there been any change orders, and if so how many? A: There were a total of two (2) change orders. 5. Q: Do they perform on a timely basis as required by the agreement? A: The Department's agreement was with the Architect of Record (AOR); SRS timely performed for everything required of them. ' 6. Q: Was the project manager easy to get in contact with? A: Yes. PM made himself available as needed and perform multiple site visits requested under short notifications. 7. Q: Would you use them again? A: Without reservations 8. Q: Overall, what would you rate their performance? (Scale from 1 -5) A: Ig5 Excellent ❑4 Good ❑3 Fair ❑ 2 Poor ❑l Unacceptable 9. Q: Is there anything else we should know, that we have not asked? A: Very helpful and professional firm. PM showed incredible zeal in looking out for Dept's best interests while analyzing and validating contractor's requests for extra cost/time. Name: Joel Arango Sr. Title: Construction Section Head The undersigned does hereby certify that the foregoing and subsequent statements are true and correct and are made independently, free from vendor interference/collusion, ' Print Name: Aa4� �.-Ll 2 Date: RFQ No. 2012 -10 Continuing Contract for Professional Services 6.3 REFERENCE QUESTIONNAIRE It is the responsibility of the contractor /vendor to provide a minimum of five (5) government agency references other than North Miami Beach using this form and providing this information with your submission. Failure to do so may result in the rejection of your submission. Giving reference for: (Bidder) SRS Engineering, Inc. Firm giving Re erne: 0"/, D Address: Gt t ra Gi Phone: 305 A- 69L) —J _ U °) J 1. Q: What was the title of the contract job assigned to Bidder? / n 03 A: /'vn /c,Z CIS S�"1� G nc� dGTr�I,�SCct�i)/t �]. /.' 2. Q: What was the scope or work/services as signed to Bidder? A: G/)1 //) � %)h� WY'S / /v` /i'4y-) 3. Q: What s the ollar valu of the contract? A: 4. Q:Have there been any change orders, and if so how many? A: \'5 I �G 5. Q: Do the perform on a time basis as required by the agreement? A. ` � 6. Q: Was the project manager easy to get in contact with? A: \'Es 7. Q: Wou you use them again? 8. Q: Oveff((all, what would you rate their performance? (Scale from 1 -5) A: >E�5 Excellent ❑4 Good 03 Fair ❑ 2 Poor ❑l Unacceptable WGS e)gend" 9. Q: Is there anything else we should know, that we have not asked? A: N) t The undersigned does hereby certify that the foregoing and subsequent statements are true and correct and are made independently, frr from vendor interference/collusion. //�1 / Name: </v��4 .�6/Gf/7Lr. -7 Title L;Lt11'L ineeV Print Name: Date: Page 40 of 69 IRFQ No. 2012 -10 ConSnuing Contract for Professional Services 6.3 REFERENCE QUESTIONNAIRE It is the responsibility of the contractor /vendor to provide a minimum of five (5) govemment agency references other than North Miami Beach using this form and providing this information with your submission. Failure to do so may result in the rejection of your submission. Giving reference for: Firm giving Reference: SRS Engineering, Inc. Address: G 4s P W -3 -+t14) 3 o \z Phone: 30 s- sSro -3aoo Fax: Email: 1. Q: What was the title of the contractor job assigned to B`id(dQ1r? A: C-, \y o� R�o�s� iS`g1cl27c LJ ec — Weic 2. Q: What was the scope or work/services assiigned1 to Bidder? S rO A: 3. Q: What was the dollar Value of the contract? 4. Q:Have there been any change orders, and if so how many? A: �,so ' �e c S. 5. Q: Do they perform on a timely basis as required by the agreement? A: 6. Q: Was the project manager easy to get in contact with? A: 7. Q: Would you use them again? A: 1Q7 8. Q: Overall, what would you rate their performance? (Scale from 1 -5) A: ❑5 Excellent ❑4 Good ❑3 Fair ❑ 2 Poor ❑1 Unacceptable \V< 9. Q: Is there anything else we should know, that we have not as ed? A: �j�2S o .2Y Q� \Qn vgnS��vw W.�til o��c c� �k�e x• C¢ The undersigned es hereby certify the foregoing and subsequent statements are true and correct and are made independently, ee%�pm v or' a ce Ilusion. Name: \ --\ Title }Yt c.�'c�C.pK-\MG [� J Print Name: Coo Z • \��\ o Date: 5 z-� \Z Paoe 40 of 69 RFQ No. 2012 -10 Continuing Contract for Professional Services 6.3 REFERENCE QUESTIONNAIRE It is the responsibility of the contractor /vendor to provide a minimum of five (5) government agency references other than North Miami Beach using this form and providing this information with your submission. Failure to do so may result in the rejection of your submission. Giving reference for: (Bidder) SRS Engineering, Inc. Firm giving Ref erAncW A tou� - b2& CwAk Address: 11 �airar. a 1 U, 22 i leer Phone: ljoS- a7$ - IS43 Fax: �f Email: i iu J C rMIpN11 e. p 1. Q: What was the title of the contract or job assigned to Bidder? A. Conskuc bA A.lo.wgcow& -+ 2. Q: What was the scope or work/services assigned to Bidder? A: CoM.>tiv�CFi n con %,, 140.&J , re tA c..., paq #%J ' SQL.lf A+wl�ais 4s reqq,�..-"A' 3. Q: What was the dollar value of the contrast? A: 9 101,00c) ' 4. Q:Have there been any change orders, and if so how many? A: 1 j*,Ae ftb. 16,.uae;4o4 Iftle4Qroyest 4wd 5. Q: Do they perform on a timely basis as required by the agreement? A: */ 6. Q: Was the project manager easy to get in contact with? A: ' Ye S 7. Q: Would you use them again? A: yes 8. Q: Overall, what would you rate their performance? (Scale from 1 -5) A: 95 Excellent ❑4 Good ❑3 Fair ❑ 2 Poor 01 Unacceptable 9. Q: Is there anything else we should know, that we have not asked? A: The undersigned does hereb certify that the foregoing and subsequent statements are true and correct and are made independently, free fr v ence /collusion. n �1 '� �(r/ ( J' Name: 1 II11 .J- Title CSWC11'496 , 1J7 R 9 4044KiU& Q Print Name: Jory X t'tyYkiJLe, Jr, Date: 6,ZA /12 Paee 40 of 69 RFQ No. 2012 -10 Continuing Contract for Professional Services 6.3 REFERENCE QUESTIONNAIRE It is the responsibility of the contractor /vendor to provide a minimum of five (5) government agency references other than North Miami Beach using this form and providing this information with your submission. Failure to do so may result in the rejection of your submission. Giving reference for: SRS Engineering, Inc. Firm giving Reference: A41 fe w e 06 ,46 W? ko, ~ F Address: 30 1 5 323 sl" 1 lw .r' Ft 3314 4 Phone: 416- z68 s— zd7. Fax: 7ti -260 5'1l 7 Email: 1. Q: What was the tide of the contract or job assigned to Bidder? A: mOttlA 5 6 P.: f s f. d«,T , vkyroee s 2. Q: What was the scope or work/services assigned to Bidder? A: 6;w; ,n ie o4j Jtt,Yn 4 kd ��v�krsrr.�r a/ crrvcl..�luu alp rvxv, -�5 fsi Jlu��' 3. Q: What was the dollar value of the contract? A: $ 5107 0 ✓g. 4. Q:Have there been any change orders, and if so how many? A: 'kip C-Ar 74 o4en 5. Q: Do they perform on a timely basis as required by the agreement? A: yap, / 7 d� 6. Q: Was the project manager easy to get in contact with? A: yet, /e Wh. 7. Q: Would you use them again? A: 8. Q: Overall, what would you rate their performance? (Scale from 1 -5) A: 95 Excellent 04 Good ❑3 Fair ❑ 2 Poor ❑l Unacceptable 9. Q: Is there anything else we should know, that we have not asked? A: "a The undersigned d s hereby certify that the foregoing and subsequent statements are true and correct and are made independently, free om vendor interference /collusion. / Name: � Title 7'rnl�SSr✓xre�' C.pa, nee, Print Name: A4, rt1a, V Date: 1 01 Page 40 of 69 6itp of Alami (,:.`)= Johnny Martinez, P.E. 1 '< ,,.�" City Manager To Whom it May Concern Subject: Reference Letter for Consultant Name of Proposer: SRS Engineering, Inc. The above referenced Consultant is submitting on a Request for Qualifications that has been issued by the City of Miami. We require that the Proposer provide written references with their submission and by providing you with this document the Consultant is requesting that you provide the following reference information. We would appreciate you providing the information 1 requested below as well as any other information your feel is pertinent: Name of Project: Naranja Lakes CRA Consultant Consultant (Construction Administration and Inspections) Owners representative for construction phase of new community building, and right of way improvements including roadway, drainage, water and sewer, and landscaping improvements. Scope of work: Value of project: S 17,745,355 Value of Design Services: $ 208,000 nn� ' Delivery method: [] Design-Bid-Build F) CM @Risk ❑ Design -Build K Other (Oms�- AAW% ) Design completed on time & within budget: k Yes ❑ No Date completed: 0512011 If no, was the Consultant at fault or contribute to the delay(s) or increased cost? ❑ Yes ❑ No Quality of Design: 2 Above expectations ❑ Average ❑ Below Expectations Errors & Omissions: U Above expectations ❑ Average ❑ Below Expectations (Above expectations means there were fewer errors & omissions than anticipated) Did Errors & Omissions result in increased construction cost? ❑ Yes )f No Did Consultant provide Construction Administration services? Yes ❑ No ❑ limited scope Was the Consultant responsive to the Owner & Contractor ?: R Yes ❑ No Name of individual pl 'h this form: Jorge M. Fernandez Signature: Telephone: 7(3'02)375 -1543 Sincerely, Jeovanny Rodriguez, P.E. Assistant Director Date: r /ro/r! Title: Coordinator, Strategic Business Mgmt. E-mail: jjorge @miamidade.gov 1:7801191:1 Cftp of Aim, (5 To Whom it May Concern Carlos A. Migoya City Manager Subject Reference Letter for Consultant's Project Manager Name of Proposer: SRS Engineering, Inc. Name of Project Manager: Olivedo Sanchez The above referenced Consultant is submitting on a Request for Qualifications that has been issued by the City of Miami. We require that the Proposer provide written references for their Project Manager (PM) with their submission and by providing you with this document the Consultant is requesting that you provide the following reference information. We would appreciate you providing the information requested below as well as any other information your feel is pertinent: Name of Project: City of Hialeah Fueling Station Scope of work: Design of Fueling Station including new canopy, pumps, tanks, booth & site pvmt. Value of project: $647,285 Value of Design Services: $73,408.43 Delivery method: [] Design - Bid -Build El CM @Risk E] Design -Build ® Other ( cc, ) Construction completed on time & within budget: ® Yes ❑ No If no, did the PM at contribute to the delay(s) or increased cost? ❑ Yes ® No Quality of Design: ® Above expectations ❑ Average ❑ Below Expectations Errors and Omissions: ❑ Above expectations ❑ Average ❑x Below Expectations (Above expectations means there were fewer errors & omissions than anticipated) Did Errors & Omissions result in increased construction cost? Was the Project Manager responsive to the Owner & Contractor? Was the Project Manger timely with reviews and submittals? Did the Project Manger quickly resolve issues as they arose? Comments: Excellent engineering firm. Professional 10+ years. Name of individua Signature: rector Telephone: Sincerely, Gary Fabrik Assistant D this form: Guanchez ❑ Yes ® No x❑ Yes ❑ No © Yes ❑ No ® Yes ❑ No Date:04 /01 /10 Title: Director, Const. & Maint. E -mail: JGUANCHEZ @HIALEAHFL.GOV RFQ -PM -R eitp Of �41iami Johnny Martinez, P.E. �C City Manager 1 To Whom it May Concern Subject: Reference Letter for Consultant Name of Proposer: SRS Engineering, Inc. The above referenced Consultant is submitting on a Request for Qualifications that has been issued by the City of Miami. We require that the Proposer provide written references with their submission and by providing you with this document the Consultant is requesting that you provide the following reference information. We would appreciate you providing the information requested below as well as any other information your feel is pertinent: Name of Project: NW 138th Street and adjacent canal from 1 -75 to west of NW 107th Ave. 6-lane divided roadway, dbl left turn & deceleration lanes, signalized intersections at NW 97 Ave, Scope of work: NW 102 Ave, & NW 107 Ave. & permitting including ERP (Wetlands), & const. phase services. Value of project: $ $12,450,000 Value of Design Services: 5417,374 Delivery method: A Design- Bid -Build ❑ CM @Risk ❑ Design -Build ❑ Other ( ) Design completed on time & within budget: * Yes ❑ No Date completed: 1212012 If no, was the Consultant at fault or contribute to the delay(s) or increased cost? ❑ Yes ❑ No Quality of Design: Ef Above expectations ❑ Average ❑ Below Expectations Errors & Omissions: C9 Above expectations ❑ Average ❑ Below Expectations (Above expectations means there were fewer errors & omissions than anticipated) Did Errors & Omissions result in increased construction cost? ❑ Yes 0 No Did Consultant provide Construction Administration services? ❑ Yes ❑ No 21 limited scope Was the Consultant responsive to the Owner & Contractor ?: 21 Yes ❑ No Comments: S/ZS 14 AS ()20V//3EO l4uL-f'IPL� XL)A 3 wAle OESIyN Pn-O -fEZ-_rs For- TtlE GI-ry o 91ALEA/4 AND /S bry 0007- 17vv1IV4, CoNT/2AC.T Name of individual w leting this form: Jorge Hemandez, Date: 03-14 N 13 Signature: T4 Title: Director, Streets Department, Hialeah Telephone: (305) 687 -2656 E -mail: jehemandez@hialeahfl.gov Sincerely, Jeovanny Rodriguez, P.E. Assistant Director RFQ -PP-R '4 of suN'� DELIVER TO: REQUEST FOR City of Sunny Isles Beach QUALIFICATIONS OPENING: 2:30 PM City Clerk SECTION 5 08/12/2014 18070 Collins Avenue BID SUBMITTAL FORMS Sunny Isles Beach, FL 33160 Issued by: Purchasing Agent Date Issued: This Bid Submittal Consists of Andrew Rozwadowski 07/17/2014 Pages 16 through 19 Sealed bids are subject to the Terms and Conditions of this Request for Qualifications and the accompanying Bid Submittal. Such other contract provisions, specifications, drawings or other data as are attached or incorporated by reference in the Bid Submittal, will be received at the office of the City Clerk at the address shown above until the above stated time and date, and at that time, publicly opened for furnishing the supplies or services described in the accompanying Bid Submittal Requirement. RFQ 14 -07 -02 Continuing Professional Architectural & Engineering Services Firms Only (CCNA) Procurement Agent., Firm Name: Andrew Rozwadowski SRS Engineering, Inc. Commodity Code(s): RETURN ONE (1) ORIGINAL, ONE COPYAND ONE ELECTRONIC PDF COPY ON CD OR DVD OF BID SUBMITTAL PAGES AND AFFIDAVITS FAILURE TO SIGN PAGE 16 THROUGH 19 OF THE BID SUBMITTAL WILL RENDER YOUR BID NON - RESPONSIVE City of Sunny Isles Beach i Request for Proposal No. 14 -07 -02 "h of SUN �e+- SECTION 6 BID SUBMITTAL FOR: ACKNOWLEDGEMENT OF ADDENDA INSTRUCTIONS: COMPLETE PART I OR PART 11, WHICHEVER APPLIES PART I: LIST BELOW ARE THE DATES OF ISSUE FOR EACH ADDENDUM RECEIVED IN CONNECTION WITH THIS BID Addendum #1, Dated Aug. 1St, 2014 Addendum #2, Dated Addendum #3, Dated Addendum #4, Dated Addendum #5, Dated Addendum #6, Dated Addendum #7, Dated Addendum #8, Dated PART II: ❑ NO ADDENDUM WAS RECEIVED IN CONNECTION WITH THIS BID FIRM NAME: SRS Engineering, Inc. AUTHORIZED SIGNATURE: r� DATE: 8/12/14 TITLE OF OFFICE : President City of Sunny Isles Beach I Request for Proposal No. 14 -07 -02 NNY �' •gin ti., li T� 1 •'9 P SF 9�• FLOP�O yE� C /rF OF SUN 'NO Addendum No. 1 CITY OF SUNNY ISLES BEACH t Continuing Professional Architectural & Engineering Services Firms Only (CCNA) CITY RFQ NO. 14 -07 -02 To All Bidders: Bidders for the above - referenced project shall take note of the following changes, additions, deletions, clarifications, etc. to the Plans and Specifications, which in accordance with the Contract Documents shall become a part of and have precedence over anything shown or described otherwise. Response to Question: • Can a firm submit as a prime as well as a sub on another firm's submittal? No, this is not allowed. END OF SECTION iFriday. August 01, 2014 a %rr OI ws BID SUBMITTAL FORM Bid Title: Continuing Professional Architectural & Engineering Services Firms Only (CCNA) The undersigned Proposers proposes and agrees, if this Bid is accepted, to enter into an agreement with the City of Sunny Isles Beach to perform and furnish all Work as specified or indicated in the Contract Documents and in accordance with the other terms and conditions of the Contract Documents. The Proposers accepts all of the terms and conditions of this or Request for Qualifications. This Bid will remain subject to acceptance for 90 days after the day of Bid opening. The Proposers agrees to sign and submit the Agreement with the other documents required by the Bidding Requirements within ten days after the date of the City's Notice of Award. In submitting this Bid, the Proposer represents, as more fully set forth in the Agreement, that: The Proposer has familiarized himself /herself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Law and Regulations that in any manner may affect cost, progress, performance, or furnishing of the Work. • The Proposer has given the City written notice of all conflicts, errors, discrepancies that it has discovered in the Contract Documents and the written resolution thereof by City is acceptable to the Proposer. • This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation; the Proposer has not directly or indirectly induced or solicited any other Proposers to submit a false or sham Bid; the Proposer has not solicited or induced any person, firm or 1 corporation to refrain from Bidding; and Proposer has not sought by collusion to obtain for itself any advantage over any other Proposers or over the City. The City and the successful Proposer will establish completion times for each individual Work Item and the successful Proposer agrees that the work will be completed within the time frames agreed upon and stipulated in the individual Purchase Orders and /or Notice to Proceed. ' Firm Name: SRS Engineering, Inc. Street Address: 5001 SW 74th Court, Suite 201, Miami, FL 33155 Mailing Address (if different): SAME City of Sunny Isles Beach I Request for Proposal No. 14 -07 -02 „r of SUN'S_ 11 1 11 Telephone No. 305 - 662 -8887 Email Address: ignacio@srs-corp.com No. 305 - 662 -8858 J No. 4/$ _&igl7 IS/ Z * "By signing this document the bidder agrees to all Terms Signature: (Signature of al�worized agent) Print Name: Ignacio Serraita President THE EXECUTION OF THIS FORM CONSTITUTES THE UNEQUIVOCAL OFFER OF PROPOSER TO BE BOUND BY THE TERMS OF ITS PROPOSAL. FAILURE TO SIGN THIS SOLICITATION WHERE INDICATED ABOVE BY AN AUTHORIZED REPRESENTATIVE SHALL RENDER THE PROPOSAL NON- RESPONSIVE. THE CITY MAY, HOWEVER, IN ITS SOLE DISCRETION, ACCEPT ANY PROPOSAL THAT INCLUDES AN EXECUTED DOCUMENT WHICH UNEQUIVOCALLY BINDS THE PROPOSER TO THE TERMS OF ITS OFFER. City of Sunny Isles Beach I Request for Proposal No. 14 -07 -02 SVNNi Itr'.t c'k = V_ t NON- COLLUSION AFFIDAVIT City of Sunny Isles Beach • -• __ • 18070 Collins Avenue `•r•i; •r�o���o�` Sunny Isles Beach, FL 33160 Telephone: (305) 947 -0606 Fax: (305) 949 -3113 STATE OF FLORIDA 1 COUNTY OF Miami -Dade ) The undersigned being first duly sworn as provided by law, deposes, and says: This Affidavit is made with the knowledge and intent that it is to be filed with the City of Sunny Isles Beach City Commission and that it will be relied upon by said County, in any consideration which may give to and any action it may lake with respect to this Bid. The undersigned is authorized b make this Affidavit on behalf of, SRS Engineering, Inc. (Name of Corporation, Partnership, Individual, etc.) a Corporation ,formedunderthelawsof Florida (Type of Business) (State) of which he is President (Sole Owner, Partner, President, etc.) Neither the undersigned nor any person, firm, or corporation named in above Paragraph 10.2, nor anyone else to the knowledge of the undersigned, have themselves solicited or employed anyone else to solicit favorable action for this Bid by the City, also that no head of any department or employee therein, or any officer of the City of Sunny Isles Beach, Florida is directly interested therein. This Bid is genuine and not collusive or a sham; the person, firm or corporation named above in Paragraph 10.2 has not colluded, conspired, connived or agreed directly or indirectly with any proposers or person, firm or corporation, to put in a sham Bid, or that such person, firm or corporation, shall refrain from Bidding, and has not in any manner, directly or indirectly, sought by agreement or collusion, or communication or conference with any person, firm or corporation, to fix the prices of said Bid or Bids of any other proposers; and all statements contained in the Bid or Bids described above true; and further; neither the undersigned, nor the person, firth or corporation named above in Paragraph 10.2, has directly or indirectly submitted said Bid or the contents thereof, or divulged information or data relative thereto, to any association or to an me r or agent thereo� L� Ign io Serralta President AFF T'S NAME AFFIANT'S TITLE TAKEN, SWORN AND SUBSCRIBED TO BEFORE ME this 8 day of August , 200 14 Personally Known X or Produced Identification Type of identification 1 (Affix seal here) RALPH PEREDA MY COMMISSI pNSEE1I& 3 aorsfn OCKM J* 2J, 2018 ' DECZx R2P, x-1: Ralph A. Pereda NOTARY PUBLIC (name printed or typed) 1 of t0," a. ao; n PUBLIC ENTITY CRIMES City of Sunny Isles Beach 18070 Collins Avenue �•'•'• • s i o �s.o Sunny Isles Beach, FL 33160 Telephone: (305) 947 -0606 Faa: (305) 949 -3113 SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a) FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES PUBLIC ENTITY CRIMES Pursuant to the provisions of paragraph (2) (a) of Section 287.133, Florida State Statutes - "A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a Bid on a Contract to provide any goods or services to a public entity, may not submit a Bid on a Contract with a public entity for the construction or repair of a public building or public Work, may not submit Bids on leases of real property to a public entity, may not be awarded to perform Work as a Contractor, supplier, Sub - Contractor, or Consultant under a Contract with any public entity, and may not transact business with any public entity in excess of the threshold amount Category Two of Sec. 287.017, FS for thirty six months from the date of being placed on the convicted vendor list". THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS. 11.1. This sworn statement is submitted to City of Sunny Isles Beach by Ignacio Serralta, President Ipnnt moieauai s name ana noel for SRS Engineering, inc. jpnnt name o en y su mrtmg sworn statememl whose business address is: 5001 SW 74th. Ct., Suite 201, Miami, FL 33155 and (if applicable) its Federal Employer Identification number (FEIN) is 65- 0607552 (If the entity had no FEIN, include the Social Security Number of the individual signing this sworn 11.2. 1 understand that a "public entity crime" as defined in Paragraph 287.133(1)(g), Florida Statutes, means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or with the United States, including, but not limited to, any Bid or Contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation. 11.3. 1 understand that "convicted" or "conviction" as defined in Para. 287.133(1)(b), Florida Statutes, means a finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trail court of record relating to charges brought by indictment or information after July 1, 1989, as a result of a jury verdict, non -jury trial, or entry of a plea of guilty or nolo contendere. 11.4. 1 understand that an "affiliate" as defined in Para. 287.133(1)(a), Florida Statutes, means: a.) predecessor or successor of a person convicted of a public entity crime; or b.) Any entity under the control of any natural person who is active in the management of the entity and who has been convicted of a public entity crime. The term "affiliate" includes those officers, directors, executors, partners, shareholders, employees, members, and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair oECEWER 26, 2010 2 of 7 market value under an arm's length agreement, shall be a prime facie case that one person controls another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall be considered an affiliate. 11.5. 1 understand that a "person" as defined in Para. 287.133(1)(e), Florida Statutes, means any natural person or entity organized under the laws of any state or of the United States with the legal power to enter into a binding Contract and which Bids or applies to Bid on Contracts for the provision of goods or services let by a public entity, or which otherwise transacts or applies to transact business with a public entity. The term "persons" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in management of any entity. 11.6. Based on information and belief, the statement which I have marked below is true in relation to the entity submitting this sworn statement. (Indicate which statement applies.) X Neither the entity submitting this sworn statement, nor any of it's officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, nor any affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. 1 The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. However, there has been a subsequent proceeding before a Hearing Officer of the State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer of the State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer determined that it was not in the public interest to place the entity submitting this sworn statement on the convicted vendor list. (Attach a copy of the final order.) I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 11.1 (ONE) ABOVE IS FOR THAT PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED. I ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES, FOR CATEGORY TWO OF ANY, CHANGE IN THE INFORMATION CONTAINED IN THIS FORM. By. cam. (Signature I9nac) Serralta O (Printed Name) President (Title) Sworn to and subscribed before me this 8 day of August —,20 14 , by Ignacio Serralta (AFFIX N , EREDA i'' i MY COMMISSION Q EE1tI8830 E%PIREBhIy 21118 nml�cso�m Signature: Notary Public — State of Florida Ralph A. Pereda Print or Type Commissioned Name Personally Known X OR Produced Identification 1 Type of Identification Produced 1011M 3 of 7 x yVNNi rt, e1 EQUAL OPPORTUNITY / �z AFFIRMATIVE ACTION .o *i City of Sunny Isles Beach o y 16070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947 -0606 Fax: (305) 949 -3113 EQUAL OPPORTUNITY /AFFIRMATIVE ACTION STATEMENT The contractors and all subcontractors hereby agree to a commitment to the principles and practices of equal opportunity in employment and to comply with the letter and spirit of federal, state, and local laws and regulations prohibiting discrimination based on race, color, religion, national region, sex, age, handicap, marital status, and political affiliation or belief. Signed: Title: Pregident Firm: SRS Engineering, Inc. Address: 5001 SW 74th. Ct., Suite 201 Miami, FL 33155 ' DECEMBER 26, 2010 4 of /If `SVNNY FI a; A_ CONFLICT OF INTEREST V City of Sunny Isles Beach or �I 9 16070 Collins Avenue '•ri o*x Sunny Isles Beach, FL 33160 o•` "1 o. 1VM Telephone: (305) 947 -0606 Fax: (305) 949 -3113 CONFLICT OF INTEREST STATEMENT The award of any contract hereunder is subject to the provisions of Chapter 112, Florida State Statutes. Proposers must disclose with their Bids, the name of any officer, director, partner, associate or agent who is also an officer or employee of the City of Sunny Isles Beach or its agencies. STATE OF FLORIDA COUNTY OF Miami -Dade BEFORE ME, the undersigned authority, personally appeared Ignacio Serralta who was duly sworn, deposes, and states: 18.1. 1 am the President of SRS Engineering, Inc. with a local office in N/A and principal office in Miami ' 18.2. The above named entity is submitting a Bid for the City of Sunny Isles Beach, Bid No. 14 -07 -02 described as: Landscape Maintenance Services. The Affiant has made diligent inquiry and provides the information contained in this Affidavit based upon his own knowledge. t 18.3 The Affiant states that only one submittal for the above Bid is being submitted and that the above named entity has no financial interest in other entities submitting Bids for the same project. 18.4 Neither the Affiant nor the above named entity has directly or indirectly entered into any agreement, participated in ' any collusion, or otherwise taken any action in restraints of free competitive pricing in connection with the entity's submittal for the above Bid. This statement restricts the discussion of pricing data until the completion of negotiations if necessary and execution of the Contract for this project. ' 18.5 Neither the entity nor its affiliates, nor any one associated with them, is presently suspended or otherwise ineligible from participation in contract letting by any local, State, or Federal Agency. 18.6 Neither the entity, nor its affiliates, nor any one associated with them have any potential conflict of interest due to any ' other clients, contracts, or property interests for this project. 18.71 certify that no member of the entity's ownership or management is presently applying for any employee position or actively seeking an elected position with the City of Sunny Isles Beach. ' 18.81 certify that no member of the entity's ownership or management, or staff has a vested interest in any aspect of the City of Sunny Isles Beach. 18.91n the event that a conflict of interest is identified in the provision of services, I, on behalf of the above named entity, will ' immediately notify the City of Sunny Isles Beach. Da d thi 12 of August , 201)t x. Ignacio Serralta, president AF IA Print or Type Name and Title Swam to and subscribed before me this 12 day of August . 201 )f4 A Personally Known X OR t O Produced Identification ; Type of Identification Ralph A. Pereda NOTARY PUBLIC STATE OF FLORIDA ' RALPH A. PEREDA As MY 310N S EElelbip r.C1j s' EXPIRES Ally 23.2016 CECEr 828.2010 5 of 7 SUNNY /,/ f o -� V � 1 DISPUTE DISCLOSURE City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone- (305) 947 -0606 Fax (305) 949 -3113 DISPUTE DISCLOSURE FORM Answer the following questions by placing a "X+' after "Yes" or "No ". If you answer "Yes ", please explain in the space provided, or on a separate sheet attached to this form. 19.1. Has your firm or any of its officers, received a reprimand of any nature or been suspended by the Department of Professional Regulations or any other regulatory agency or professional associations within the last five (5) years? YES NO X 19.2. Has your firm, or any member of your firm, been declared in default, terminated or removed from a contract or job related to the services your firm provides in the regular course of business within the last five (5) years? YES NO X 19.3. Has your firm had against it or filed any requests for equitable adjustment, contract claims, Bid protests, or litigation in the past five (5) years that is related to the services your firm provides in the regular course of business? YES NO X If yes, state the nature of the request for equitable adjustment, contract claim, litigation, or protest, and state a brief description of the case, the outcome or status of the suit and the monetary amounts of extended contract time involved. I hereby certify that all statements made are true and agree and understand that any misstatement or misrepresentation of falsification of facts shall be cause for forfeiture of rights for further consideration of this Bid for the City of Sunny Isles Beach. SRS Engineering, Inc. August 12, 2014 Firm ' Authors Signature 1 OeCEr 825,2010 Date Ignacio Serralta, President Print or Type Name and Title 6 of oSuNNT /f,F ANTI- KICKBACK City of Sunny Isles Beach 16070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947 -0606 Fax: (305) 949 -3113 ANTI - KICKBACK AFFIDAVIT STATE OF FLORIDA ) 1 COUNTY OF Miami -Dade ) I, the undersigned, hereby duly sworn and deposed say that no portion of this sum herein Bid 1 will be paid to any employees of the City of Sunny Isles Beach or its elected officials as a commission, kickback, reward or gift, directly or indirectly by me or any member of my firm or by an officer of the corporation. By. 44t�� Title: President a The foregoing instrument was acknowledged before me this s day of August , 20 14 , by Ignacio Serralta [name of person], as President [type of authority], for SRS Engineering, Inc. [name of party on behalf of whom instrument was executed]. AFFIX NOTARY STAMP HERE: RALPH A. PERSDA IW COMMISSION: EE188 88M DXPIRES AtY 27.2018 Non 7Y{017� .e,,, No ry Public —State of Florida Ralph A. Pereda Print or Type Commissioned Name ' Personally Known X OR Produced Identification Type of Identification Produced 1 XCEI R 2e, 2010 7 of 7