Loading...
HomeMy WebLinkAboutR.J. Behar & Company Inc.®R.J.Behar & Company, Inc. E n g i n e e r s • P l a n n e r s August 12, 2014 City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, Florida 33160 RE: Request for Qualifications — RFQ No. 14 -07 -02 Continuing Professional Services for Architectural, Firms only (CCNA) Category: Engineering Dear City Clerk: r: AUG i 2 2014 Z 3�r9V C.- Landscape Architectural, Engineering and Land Survey R. J. Behar & Company, Inc. (RJ Behar) is most pleased to submit one (1) original and three (3) copies and one (1) CD of the completed package of this Request for Qualifications No. 14 -07 -02 to provide CONTINUING PROFESSIONAL ENGINEERING SERVICES. We are complementing our team with the addition of E Sciences, Inc. who will be providing environmental assessment and testing, Professional Services Industries, Inc, who will be providing Geotechnical Services and Longitude Surveyors LLC who will assist with Survey Services. We have worked with these firms in the past and have developed great working relationships. RJ Behar was established in 1999 as a Corporation, to provide personalized services in the disciplines of engineering, planning and construction management and engineering inspection to public sector clients • throughout South Florida. Our mission is to understand our client's needs, apply the necessary resources to accomplish those needs, while building and maintaining long -term professional relationships with our clients. We pride ourselves on meeting our client's needs through the use of proper project management and an extensive quality assurance program. Repeat business is the key to our success and, as such, we recognize the need to satisfy our clients. RJ Behar has three offices located in Florida. Currently, we have an office in Miami -Dade County, Broward County, and Palm Beach County. The project will be managed and produced from our Miami -Dade office. personally will assure the overall successful completion, in terms of quality, timeliness, and budget. For the team, I enthusiastically offer this proposal and look forward to establishing a most favorable relationship between the City of Sunny Isles Beach and RJ Behar. The City of Sunny Isles Beach can expect from RJ Behar 1) undivided attention; 2) priority service; 3) personal, hands -on service; and 4) a team with recent relevant experience. The professionalism of the RJ Behar team will enable us to better serve the City's Staff and strive to surpass your expectations. Sincerely, R. EHAR & C NY, INC. U, Robert J. Behar, PE PresidenUCEO LJ E Continuing Professional Services for Architectural, Landscape Architectural, Engineering and Land Surveying Firm Only (CCNA) - RFQ No. 14 -07 -02 Table of Contents z Me- Table of Contents ........................................ ..............................1 Section 1- Company Information ................. ........................1.1.1.3 Section 2 - Qualifications ................. ............................... 2.1.2.66 Section 3 - Staffing .......................... ............................... 3.1 -3.68 ® Section 4 — Approach /Methodology ............. ........................ 4.1.4.6 Section 5 - References .............................. ........................5.1.5.3 Section 6 - Forms ............................. ............................... 6.1.6.12 4 R.J.Behar RFQ No. 14 -07 -02 1 Page 1 1 Continuing Professional Services for Architectural, Landscape Architectural, ..i Engineering and Land Surveying Firm Only (CCNA) - RFQ No. 14 -07 -02 IFSection 1— Company Information: Ll 0 RJ Behar & Company, Inc. is a civil engineering corporation, with three offices located in Florida. Since being founded in 1999, we have grown to 43 employees and three office locations. One office in Broward County, an office in Miami -Dade County and one in Palm Beach County. The project will be managed and produced from our Miami -Dade office. Company Locations: R.j.Behar & Company, Inc. I'u Engineers. Planners Palm Beach County 12788 Forest Hill Blvd., Suite 2003B Wellington, Florida 33414 Phone No.: (561) 333 -7001/ Fax No.: (561) 716 -6117 Broward County 6861 SW 196th Avenue, Suite 302 Pembroke Pines, Florida 33332 Phone No.: (954) 680 -7771 / Fax No.: (954) 680 -7781 Miami -Dade County 7850 NW 146th Street, Suite 504 Miami Lakes, Florida 33016 Phone No.: (305) 558 -3777/ Fax No.: (305) 558 -8909 L 4lanatee twdee /`s =U-3 Gradee For more information about R. J. Behar & Company, Inc., please visit our website: www.ribehar.00m R J Behar & Company, Inc. has no outstanding litigation. " R.j.Behar RFQ No. 14-07 -02 1 Page 11 Palm Beea Broward E Continuing Professional Services for Architectural, Landscape Architectural, 3 Engineering and Land Surveying Firm Only (CCNA) - RFQ No. 14 -07 -02 L � NGITUDE S U R V E Y O R S ENGINEERING Q Sciences ENVIRONMENTAL ECOLOGICAL 1 Information 0i To Build On Implementing Services: Address: 8290 NW 64 Street, Miami, Florida 33166 Phone No.: (305) 463 -0912 Fax No.: (305) 513 -5680 www.longitudesurveyors.com Address: 224 SE 9th Street, Fort Lauderdale, FL 33316 Phone No.: (954) 484 -8500 Fax No.: (954) 484 -5146 www.esciencesinc.com Address: 7950 NW 64th Street, Miami, Florida 33166 Phone No.: (305) 471 -7725 Fax No.: (305) 593 -1915 www.psiusa.com The staff identified in the organization chart will be able to immediately implement services after authorized to begin. The RJ Behar team will be able to provide sufficient staff to ensure timely completion of any and all assignments under this contract. We avoid staffing conflicts by scheduling weekly meetings with our Project Managers to address project action items and staffing issues. These meetings have been very valuable in making sure that there is adequate staffing for all projects and that all project schedules are maintained. 14 R.J.Behar RFQ No. 14 -07 -02 1 Page 11. 2 Continuing Professional Services for Architectural, Landscape Architectural, Engineering and Land Surveying Firm Only (CCNA) - RFQ No. 14 -07 -02 Proof of Insurance: ACS RO °a CERTIFICATE OF LIABILITY INSURANCE °em `/ 12/13/2013 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER TI1S CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CEM71CATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER AND THE CERTLFICATE HOLDER IMPORTANT: If the cettlDOte holder is an ADDITIONAL INSURED. Ore poecli4s) n ton M endoeted. D SUBROGATION IS WAIVED, SIO)xt to Oe tenets and condrJons of the Wiry. certaln policies tnaY naILAe an erWw3enenl A sUtenent on 003 cenfftcafe Foes net coNer r1gNS to tte ctlDDeate AOI(Jtl In IMu Of z%wh enafonwn a vt (1 PReAILQ Grayling Insurance Brokerage 450 Northridge Parkway Stia" 102 Atlanta GA 30350 Cooper SLdth (710)552 -4225 ma, .a-len jj arty. loyolalgryling. con Anclmlo mlEas.e xAC• We A Sentinel Insurance C LTD 11000 u MAUR) R.J. Bather I Company, Ines 6861 S.F. 196th Avenue Suite 302 Pembroke Pine. FL 33332 WetAD1 a :Traveler. C .... Ity G Su"ty 19038 aside Continental Ca.ualty Cotopeoy 20443 ARTIER s 2,000,00 M ®F]D F. val9wi2IA'IMIWY TICS S TO CERTIFY TIIAT TIE POLICIES OF I SLIRANCE IISMD BELOW HAVE BEEN SSUED TO TIE VSIIRED NAMED ABOVE FOR TIE POL%.Y PERDD CDKATED. NOTWITILSTAlS M ANY REOUitEMEM, TERM OR CONOfTIOfJ OF ANY CONTRACT OR OTIER DOC1A/ENT W1 RESPECT TO WHICH TH5 CERTIFICATE MAY SE 455LEO OR MAY PERTAIN. THE INSURANCE AFFORDED BY TIE POLICIES DESCRIBED IEREIN IS SUBJECT TO ALL TIE TERMS, EXCLUSIONS AND CONDITIONS OF SIKH POLICES. UMFTS SHOWTf MAY HAVE BEEN REIXKED BY PAID CLAIMS. uw i'IPEp eWMMCE THE ErPWA110N DATE TIIEREOF. NDTGE WILL BE DELIVERED W For Proposal Purposes AxoRwxcew THEE YFIm 3101. BF 1 /17/2013 1 /17/2011 1➢ef6 A ODaMILYRRY E (sl6eatL CVa.Y U.atm QNKbKF ®OQ:Ui s8PCD03T Ewa ommmcE f 1,000,00 s 2,000,00 M ®F]D 1 10,000 val9wi2IA'IMIWY I 1,000 00 cvmAt,ccraasT6 1 2,000 00 cer1 AOGREn.rE U6sf AFAlES raf t¢av % °qO Loc MRCa�c15aT1s]oR rac 1 2,000,00 t A AVfeMe.]Y[tLilflr % µY yna . ® 6" zn yR05 WROLwIEO was 389 1 /iJ /201] 1 /iT /2011 1,000,000 90olYOwlY� J 1 paYMARY6Y ATtlMe 1 1 t A % Wm�u uA. OaFSS UAe $ o¢w 1 /1T /201] 1 /21/2014 Ewa amsamaz 3 3,000,000 AOCREC +:E t 3,000,000 $ 1 3 B NpRI®ty WYP91y}eN AXOMWFIH YA6Y2Y YIN ++Y PAOPEErOtVAATE+.4:+FSVfME❑ Iee�00200FDf e er.en.,eee o�soeRlloN Of oeERA *gvsaa MIA - 3864T21 -1 /1/2011 /1 /3013 % NC O Y EL. Era .mcatn s 1,000,000 EL ne£KE -Ew L 1 000.000 EL t3swg -racy LRaT f 1 000 000 C Prof"olotal 11 -hi 11[y LIMI 28 836 36 39 t/0 /2013 1 /l7/2034 ev M.+ 62,000,00 �meee $3,000,00 OIKJtffIOM OF On6UTpx6f LOCAigbB lveGFf IAexA ACOAO fOf. A66oyW Apvta 6cMW. a nets rpo b rp W.11 r COTCNGTC Ynl nCn ACORD 26 (Ml=S) 0IMS4010 ACORDCORPORATION. Al rlghb n3erYe 1. WAA111 nR,m Tw. Arnon n..... .,M lots arnon 2 ff =1- 3. RFQ No. 14 -07 -02 1 Page 11. 3 41DIAD ANY OF TIE ABOVE OESC M POLICES M CANCELLED aEFp1E THE ErPWA110N DATE TIIEREOF. NDTGE WILL BE DELIVERED W For Proposal Purposes AxoRwxcew THEE YFIm 3101. AVMd Wltll RSSVCI.i /J David d Co111Dg. /J /' %RRX +'L /� -��'� '-^m�— ACORD 26 (Ml=S) 0IMS4010 ACORDCORPORATION. Al rlghb n3erYe 1. WAA111 nR,m Tw. Arnon n..... .,M lots arnon 2 ff =1- 3. RFQ No. 14 -07 -02 1 Page 11. 3 11 Continuing Professional Services for Architectural, Landscape Architectural, Engineering and Land Surveying Firm Only (CCNA) - RFQ No. 14 -07 -02 Section 2 - Qualifications RJ Behar qualifications include the following disciplines: • Civ0ite Engineering • Stormwater Master Plan • Water Resources • Hydrologic - Hydraulic Studies • Bridge Hydraulics and Scour Analyses • Stormwater Sewer Design • Sanitary Sewers and Water Distribution • Drainage Design • Open Channel Hydraulics/Energy Dissipation • Flood Control and Drainage Studies • Injection Well Design • Highway Drainage • Sanitary Sewer Collection • Spill Prevention and Best Management Practice Plans • NPDES Permitting for Construction Activities • GatesrCulvertsrSpillways Design • Transportation Engineering • Roadway Design • Traffic Engineering • Traffic Calming Design • Transportation Planning • Freeway Design • Site Planning and Engineering • LAP Certification Support • Project Development & Environmental Studies • Environmental Engineering Studies • Environmental Permitting • Structural Engineering (bridges and buildings) • Construction Management and Inspection Specialties RJ Behar has distinct areas of specialization, which include Professional Hydrologists, Board Certified Environmental Engineers, Certified Floodplain Managers, Environmental Inspectors, Threshold Inspectors, Vertical Inspectors, Technical Field Inspectors, Roadway and Bridge Inspectors, Earthwork Inspectors, Concrete Inspectors, Asphalt Inspectors, CTQP certified inspectors, LEED AP certified, certified MOT, Certified Public Managers, Professional Traffic Operations Engineers, and Transit Planners. ROADWAY DESIGN RJ Behar began as a roadway design firm. Our primary expertise is roadway design and most of our other areas of expertise came by way of roadway design or by supplementing our roadway design capabilities. Our comprehensive design experience and expertise includes: Roadway Plans, Traffic Studies, Signal Design, Pavement, Marking and Signing Design, Traffic Control Plans, Lighting Plans, Drainage and Permitting, Water and Sewer Plans, Utility Relocation Plans, Utility Design and Relocation Plans and Public Involvement. We provided professional services for roadway design along US- 1 /SR -5 Hallandale Beach Boulevard. The scope of the project consisted of design plans for milling and resurfacing (RRR) for one mile of a major arterial roadway. The scope included drainage improvements, pavement marking and signing, overhead signing plans, lighting plans, two signal locations and landscape plans. For Ansin Boulevard, RJ Behar provided Stormwater Drainage design of this industrial neighborhood and street reconstruction plans services. Our staff has extensive roadway design experience including design of major arterial roadways such as: SR- 8451Powerfine Road in Boca Raton (FDOT D4); US- 1Biscayne Boulevard from 199u, to 2131, Street (FDOT D6) ; SR -A lA in Palm Beach County (FDOT D4); Andrews Avenue, Pompano Beach (FDOT D4); NW 441, Street, Lauderdale Lakes; Alton Road (SR -907) in Miami Beach (FDOT D6); FURE R.j.Behar u RFQ No. 14 -07 -02 1 Page 12.1 Continuing Professional Services for Architectural, Landscape Architectural, Engineering and Land Surveying Firm Only (CCNA) - RFQ No. 14 -07 -02 S.W. 27m Avenue (SR -9) in Miami (FDOT D6), Kendall Drive (SR -94) in Kendall (FDOT D6), and Okeechobee Road (SR -25) in Hialeah Gardens (FDOT D6). We also have extensive roadway design experience on local city streets such as NW 44th Street in Lauderdale Lakes, E. Palomino Drive and S.W. 62nd Court in the Town of Southwest Ranches, Bayshore Drive in Miami, N.W. 131h Street and N.E. 15th Avenue in Fort Lauderdale, and 19 miles of street resurfacing in the City of Tamarac. In the City of Hialeah, RJ Behar has completed the following projects: W. 33rd Street, W.74th Street, Palm Avenue, W 77^ Street, W. 37th Street, E. 1s' Avenue to E.2nd Avenue (from E.10th and 15th Streets), E.1s' Avenue (from Okeechobee Road to 21st Street), E. 11, Avenue to E.2nd Avenue (from E. 16th and 20t" Streets), West 29th Street (from West Okeechobee Road to West 4th Avenue), Palm Avenue (from West 45th Street to West 49th Street), E. 4th Avenue Improvements, W. 6th Avenue/W81a Street, S.E. 8th Cour&9h Avenue Improvements, W. 831d Court Improvements and E. 26th, E. 27th StreetlE. 11m Avenue. CIVIL ENGINEERING RJ Behar has extensive experience in municipal engineering. We understand the governmental engineering process, the bid process, contract administration and working with city commissions associated with municipal engineering. The key to providing successful municipal engineering service includes: being responsive, adapting to performing under short notice, leaming to be an extension to the City's Staff, understanding of the City's budgetary constraints, being user friendly, delivering on our promise, working with city councillcommission, providing quality products, and being cognizant of budgets and costs. RJ Behar has been involved in the following types of municipal engineering projects: • Streetscape Planning and Design • Parking Lot Design • City Street Planning and Design • Recreational Facility Design • Cost Estimating • Contract Administration • Site Engineering • Neighborhood Studies • Streets Resurfacing • Funding ApplicationsiLAP Certifications • Grant Assistance and Application PARK DESIGN RJ Behar has extensive experience in the planning and design of parks and recreational facilities. Our experience spans from the design of additional panting at existing facilities, as in the Sunrise Athletic Complex, to master planning a major facility like Holiday Park and sustainable designs such as in the Hickory Hammocks Equestrian Park (SFWMD). We have experience working on historic sites such as the improvements to the Old Davie School House, which included the creation of one acre of Florida wetland. We have also designed Fitness Trails and Multi -Use Trails in Davie and Southwest Ranches. We have designed lighting for several parks in the City of Lauderhill. Many of the projects included the upgrade of water, sewer and drainage facilities as well as procuring all the necessary permits. Some samples of our parks experience include: • Gilbert Samson Park, City of Sunny Isles Beach • Spanish River Athletic Facility (formerly Countess de Hoemle Park) City of Boca Raton, FL • Sunrise Athletic Complex Additional Parking, City of Sunrise, FL q� R.J.Behar RFQ No. U -07 -02 I Page 12.2 Continuing Professional Services for Architectural, Landscape Architectural, Engineering and Land Surveying Firm Only (CCNA) - RFQ No. 14 -07 -02 • Coral Springs Aquatic Center - Additional Parking lot, City of Coral Springs, FL • Westwind Park Improvements, City of Lauderhill, FL • SR -7 1SW 36th Streetscape Final Design - Island Park, City of Lauderdale Lakes, FL • Bucky Dent Park Drainage, City of Hialeah, FL • Welleby Park Expansion, City of Sunrise, FL • Wolk Park Lake Improvements, City of Lauderhill, FL • Southeast Park, O'Quinn Park, Milander Park, Sparks Park, Master Plans, City of Hialeah, FL • Everglades Holiday Park, Broward County Park & Recreation, FL ENVIRONMENTAL ENGINEERING, WATER RESOURCES & STORMWATER MASTER PLAN RJ Behar's services include Environmental Engineering, Water Resources and Stormwater Master Planning, as well as Construction Engineering and Inspections (CEI). We can provide environmental reports, monitoring, assessments, design, construction documents, permitting, and construction administration on any Environmental Project. We are experienced in obtaining permits from agencies such as the Water Management Districts, Local Drainage Districts, Department of Environmental Protection, the Army Corps of Engineers, the Florida Department of Transportation, Health Department and numerous City and County agencies throughout South Florida. RJ Behar has developed expertise in the areas of environmental engineering and water resources. Services in this area include: • Phase I and II Site Assessments and Remediation Plans • Wetland Mitigation Plans Design • Stormwater Master Planning • Hydrologic- hydraulic and Watershed Modeling • Sustainable Design LEED AP Certifications • Bridge Hydraulics and Scour Analyses • Stormwater Sewer Design • Open Channel Hydraulics/Canal Conveyance/Energy Dissipation • Flood Control and Drainage Studies • Injection Well Design • Highway Drainage • Sanitary Sewer Collection • Best Management Practice Plans • NPDES Permitting for Construction Activities • Preparation of Spill Control and Countermeasure Plans (SPCC) • Stormwater Pump Stations • GateslCulverts/Spillways Design • Environmental Permitting • Water Quality Modeling • FEMA Assistance • Environmental Permitting • Preparation of environmental documents for NEPA compliance RJ Behar has considerable expertise in the area of water resources. ® Our staff has developed expertise in the design and analysis of qR.J.Behar FEMA Mitigation Pump Station Hallandale Beach. Florida RFQ No. 14 -07 -02 1 Page 12.3 Continuing Professional Services for Architectural, Landscape Architectural, Engineering and Land Surveying Firm Only (CCNA) - RFQ No. 14 -07 -02 wastewater and water distribution systems. We have designed water and sewer services for commercial sites and our staff has developed wastewater and water distribution plans for citywide systems and to service Industrial Parks and new communities. RJ Behar has worked on several significant projects in the City of Hallandale Beach such as the Stormwater Drainage Improvements for Chaves Lake and 1 -95; the services included a HydrologicJHydraulic study, stormwater master plan, and flood control study and implementation plan. For the Area West of US 1 - Improvement Project, RJ Behar provided a drainage study for flood control services; performed the design for drainage improvements and water utility relocation, and provided construction management services. RJ Behar also completed the design for the FEMA Mitigation Pump Station. Water 8 Sewer Design In the area of water distribution and wastewater collection, we have extensive expertise. We provided general engineering services contract for the Broward County Water and Wastewater Services Department and we participated in the Waterworks program for the City of Fort - Lauderdale. In these contracts, RJ Behar performed the design of water distribution systems, conversion of septic tank neighborhoods to wastewater collection systems, pump station design, rehabilitation of existing lift stations, electrical and mechanical evaluations, preparation of Basis of Design Reports (BODR), review of master planning documents, evaluation of sites for communication e towers, hydraulic analyses and calculations, as well as construction administration and observation services. For Palm Beach County, RJ Behar designed the relocation of 1,310 feet of 20 inch water main and 1,299 feet of 16 inch force main relocation as part of the Northlake Boulevard Bridge over the Loxahatchee Slough. The new water main and force main are located on the new bridge. RJ Behar prepared all the details and structural design to accommodate the new utilities on the bridge. Other projects include: SE 3b Street between Martin Luther King, Jr. Boulevard and G Avenue, Belle Glade, Palm Beach County, Florida. This was a Design -Build contract with water and sewer relocations. • UAZ Zone 303 for the Broward County Water and Wastewater Services Department. • Sistrunk Boulevard Water Main relocation for the City of Fort Lauderdale. • Shady Banks Septic Tank Area 5 conversion to sanitary collection. • The Broadview Estates Neighborhood Improvement Project (BENIP) project. RJ Behar provided support in the preparation of sanitary sewer plans for bid package No 2. • Crown Linen sewer connection in the City of Hialeah. • The Public Safety Building for City of Coral Springs. Pump Stations Our experience with pump stations includes both sanitary pump stations and stormwater pump stations. For the South Florida Water Management District (SFWMD), we have inspected more than 20 stormwater pump stations. These inspections included all the components including civil, structural, mechanical and electrical systems. The • inspection reports also included cost estimates of the necessary repairs. We have been involved in other pump R.J.Behar RFQ No. 14 -07 -02 1 Page 12.4 11 Continuing Professional Services for Architectural, Landscape Architectural, Engineering and Land Surveying Firm Only (CCNA) - RFQ No. 14 -07 -02 station designs such as the 1 -95 Stormwater Pump Station for FDOT District 4, the FEMA mitigation stonnwater pump station for the City of Hallandale Beach, the Bay Road stonnwater pump station for the City of Miami Beach and the U.S. Army Corps of Engineers' Pump Station 362 structural evaluation. For the Broward County Water and Wastewater Services Division, we recently completed designing the rehabilitation of two sanitary pump stations as part of the UAZ Zone 303 utility improvements project. RJ Behar can provide full support for pump station design including hydraulic design, site design, electrical, mechanical and structural components. TRANSPORTATION AND TRAFFIC ENGINEERING We provide transportation engineering design services in the following areas: • Feasibility Studies • Corridor Studies • Master Planning • Transportation Impact Studies • Land Use Amendment Plans In approaching all transportation planning projects, RJ Behar integrates the land use issues and transportation relationships in order to provide the proper balance between the travel modes and the operation of the facility, taking into consideration the social, environmental and engineering constraints, and available funding to provide innovative and practical solutions for our clients. We also recognize the importance of involving the public throughout our solutions, which increase our chances towards a successful 11�7� .i ` \x . t pedestrian friendly transportation solutions for all our clients. Some samples of transportation planning services include: • Transportation Master Plan, Traffic Counts, City of Hallandale Beach • NW 7t^/9m Connector Study, Fort Lauderdale • NW 13m Street Master Plan, Fort Lauderdale • US -1 Busway Study, Miami -Dade • Gratigny Parkway Feasibility Study, Opa -Locka • 1 -95 Downtown Feasibility Study • Flagler Street Master Plan, Miami • E. ls' Avenue Master Plan, Hialeah Land Use Amendment Plan /Traffic Study - Town of Davie planning process in order to obtain meaningful project. We strive to develop smooth flowing, NW Bm Street at Hallandale Beach Boulevard RFQ No. 14 -07 -02 1 Page 12.5 •d .r � z ��. o.ao- ' �� rll:'�• pedestrian friendly transportation solutions for all our clients. Some samples of transportation planning services include: • Transportation Master Plan, Traffic Counts, City of Hallandale Beach • NW 7t^/9m Connector Study, Fort Lauderdale • NW 13m Street Master Plan, Fort Lauderdale • US -1 Busway Study, Miami -Dade • Gratigny Parkway Feasibility Study, Opa -Locka • 1 -95 Downtown Feasibility Study • Flagler Street Master Plan, Miami • E. ls' Avenue Master Plan, Hialeah Land Use Amendment Plan /Traffic Study - Town of Davie planning process in order to obtain meaningful project. We strive to develop smooth flowing, NW Bm Street at Hallandale Beach Boulevard RFQ No. 14 -07 -02 1 Page 12.5 C Ef Continuing Professional Services for Architectural, Landscape Architectural, Engineering and Land Surveying Firm Only (CCNA) - RFQ No. 14 -07 -02 Recent traffic analysis projects include • NW 87th Avenue - Traffic Study • Roundabout Intersection Analysis • Coral Springs Neighborhood Transit • Powertine Road Access Management Center • 111 Avenue Traffic Analysis, Hialeah • Grand Palms - Traffic Study Town Traffic Study -Town of Southwest • Palm Avenue at 17th Street Ranches Traffic Planning RJ Behar has developed expertise in the Transportation Planning and Traffic Engineering field. RJ Behar has become very familiar with the Manual of Uniform Traffic Control Devices (MUTCD), The Florida Greenbook, Florida Department of Transportation Standards, American Association of State Highway and Transportation Officials (AASHTO), The Broward County Land Development Code and many City Code Ordinances. RJ Behar owns data capturing equipment and has in -house trained staff to collect and process traffic volume data. We can perform traffic volume counts, speed studies, turning movement counts, vehicle classification studies and vehicle cut- through analysis. These traffic data gathering services are performed by our in -house staff and do not require the involvement of a third party subconsultant. This allows us flexibility and the ability to respond to our clients request for these services efficiently and on short notice. We have state of the art computer equipment and all of the latest engineering software to produce any necessary traffic plan including Synchro, CORSIM and TSIS, McTRANS HCS +T, TRAXPro, Cube 5, PETRAPro, and TCU. RJ Behar has experience in the design of modem roundabouts. We have provided contract documents for several roundabouts. Roundabouts were designed at NW 146th Street/N. Miami Avenue /S. River Drive — Roundabout, Miami -Dade County; Palm Avenue /E. 17th Street in Hialeah and at N.E. 15th Avenue /N.E.18th Street in Fort Lauderdale. STRUCTURAL ENGINEERING SERVICES Our in -house structural design capabilities enable us to provide full design services for our clients. Our structural design capabilities include: • Bridge Design (minor and major bridges, new bridges and widening) • Bridge Repairs and Complete Rehabilitation (Minor, major and bascule bridges) • Bridge Inspections (Minor, major and bascule bridges) • Pedestrian Bridges • Box Culvert and Special Drainage Structure Designs • Mast Arm Design for traffic signals 14 R.J.Behar • Retaining Wall Systems • Overhead Sign Structures • Water Control Structures • Recreational Structures • Pump Stations • Retaining Walls (Permanent and Temporary) • Fender Systems RFQ No. 14 -07 -02 1 Page 12.6 Continuing Professional Services for Architectural, Landscape Architectural, Engineering and Land Surveying Firm Only (CCNA) - RFQ No. 14 -07 -02 In the community of Golden Isles in Hallandale Beach, RJ Behar completed structural inspection of seven existing bridges, structural design for replacement of parapets and evaluation for the addition of sidewalks and preparation of plans for the improvements. The project also included public involvement to determine the type of aesthetic bridge railings. RJ Behar provided structural design plans for McDonald Park Pedestrian Bridge, City of Hialeah, Florida. Services included project management, plans preparation, structural engineering, contract documents, permitting, shop drawing reviews, utility coordination and contract specifications services We completed evaluation of structural systems at recreation facilities such as Playground & Recreational Facilities at Befti Stradling Memorial Park, and Boat Ramp at Riverside Park for the City of Coral Springs; Structural Inspection & Survey and Report Services at Charles Deering Chinese Bridge, and Structural Inspection & Survey Metro Zoo Monorail for Miami -Dade County. We have provided services to Palm Beach County under our Structures Annual Contract over the past nine years. We have made many very useful review comments on these projects and have effectively coordinated with the County and the design firms. lommmi We have recently completed structural engineering assignments under a similar work order contract for the South Florida Water Management ® District that in included: • Rehabilitation of the S -310 Navigational Lock of Lake Okeechobee • S -5A Boat Ramp, kiosks, board walk, and sheep piling system • Design of concrete slabs, and miscellaneous structures for the Hickory Hammock Equestrian Camp ground. • Feasibility study for berm at the C-4 Canal — This included evaluation of sheet pile and cast in place concrete wall systems. • Design of Fender System for the S 310 Lock CONSTRUCTION ENGINEERING AND MANAGEMENT SERVICES RJ Behar is certified by FDOT in Construction Engineering Inspections Services and currently has a general construction management contract with the South Florida Water Management District. We offer a full range of construction engineering services. These services range from providing inspection to providing on -call site engineering services for land development and municipal projects. Our proposed team members are all trained and CTPQ certified with FOOT. They are familiar with all of the required contract provisions for construction contracts including all monitoring and reporting requirements, contract and project billing documentation. We provide both infrastructure inspection as well as building inspection services. Our construction management team includes licensed General Contractors and licensed ® Threshold Inspectors. 1� R.J.Behar West RFQ No. 14 -07 -02 1 Page 12.7 Continuing Professional Services for Architectural, Landscape Architectural, Engineering and Land Surveying Firm Only (CCNA) - RFQ No. 14 -07 -02 The key to our success in providing contract administration services includes: • Proper interpretation of the construction bid documents, • Maintaining detailed documentation throughout the construction, • Documenting change orders and quantity revisions, • Documenting changes in field conditions, and • Being responsive. RJ Behar has provided construction inspection services under continuous basis contracts to the Cities of Lauderdale Lakes, Fort Lauderdale, Coral Springs, Hialeah, Palm Beach County and the South Florida Water Management District. Recent projects include: • Wal -Mart Super Center, City of Lauderdale Lakes • N. W. 44m Street Improvements, City of Lauderdale Lakes • NW 97m Avenue Construction Management, City of Hialeah • Citywide Swale Restoration Project, City of Lauderdale Lakes • Super Wal -Mart Inspections, City of Lauderdale Lakes • C-4 Canal Restoration, SFWMD • C -100 and C -2 Bank Restoration, SFWMD • S20F Wing Wall Repairs, SFWMD • Deering Estates Flow -Way, Palmetto Bay, SFWMD • Inspection of the S -310 Lock Structure Rehabilitation, SFWMD • Citywide Resurfacing Inspection, City of Coral Springs • N. W. 431d Avenue /City Hall Parking Lot, City of Lauderdale Lakes • N.E. 331d Avenue -Neighborhood Improvements City of Fort Lauderdale RJ Behar has provided full construction management services for numerous projects for municipalities, South Florida Water Management, and the Florida Department of Transportation. We are well aware of the duties need to fulfill a CEI scope, which include attending preconstruction meeting(s); reviewing and processing payment applications, approving schedule of values; monitoring and tracking the contractor's work progress and schedule; requesting and reviewing schedule modifications to ensure the contractor maximized time and resources; maintaining and accurately monitoring logs (correspondence, submittals/ shop drawings, RFI's, change orders, deficiency reports, payment applications); responding to contractor RFI's in a timely manner, conducting and coordinating the technical review and return of contractor submittals in a timely manner; coordinating and monitoring inspection procedures and making site visits as necessary to accomplish same; assisting/coordinating with Utilities (BellSouth, FP &L, cable, etc.) and City Departments as required; attending neighborhood meetings and /or City Commission meetings as requested; determining the need for any change orders, providing summary and justification for change as well as cost1 G estimates; assisting in negotiations with the contractor; conducting - T e weekly/bi- weekly meetings to evaluate the contractor's progress andt r , to resolve issues; preparing and distributing meeting minutes; "= Ott o .• t v1 -` overseeing substantial and final inspections, preparing and tracking punch list items; reviewing and processing record drawings; and preparing certifications and dose -out permits. J' I RFQ No. 14 -07 -02 1 Page 12.8 C Continuing Professional Services for Architectural, Landscape Architectural, Engineering and Land Surveying Firm Only (CCNA) - RFQ No. 14 -07 -02 RJ Behar's experience also includes the construction inspection and supervision of wetland and fill1dredge activities. We performed those services for the SFWMD at the Deering Estates Flow -way project which included construction of a man -made wetland for educational purposes. We also inspected the Southern Crew Imperial River restoration Phase 1 and 2. Restoration activities included regrading existing filled and agricultural areas, filling ditches and removing berms in accordance with the proposed restoration plan. The completed project provided shallow foraging habitat in the freshwater mars h areas and gentle side slopes on the deep water depressions for tactile feeder wading birds, specifically the Wood Stork, white ibis and roseate spoonbills. Additionally, the plan provided and maintained the existing Panther habitat. Existing Cypress areas remained and exotic vegetation was removed. FAMILIARITY WITH PERMITTING AGENCIES Our experience with permitting includes all types of projects. In our AtA project for the FDOT, as an example, we had to permit the project with the FDEP and the US Army Corps of Engineers. The project was inside the coastal construction control line (CCCL) and included wetland (mangrove) impacts. We designed a mitigation project and coordinated it with a local municipality, which allowed them to enhance an existing park alongside the Intracoastal Waterway. In the project, we also prepared the stormwater pollution prevention plans to comply with the NPDES permitting for construction activities. We prepared the fill and dredge plans, permitting and the mitigation site permitting. i - � i zuse:a — j, zo.. • j , We recently permitted the 5th Street Bridge over the Miami Canal. We prepared the entire fill and dredge permit plans that included work in the navigation channel, seawall construction and outfall retrofits. RJ Behar is currently serving as one of two firms who serve as District Drainage Engineers (DDE) for the Central Water Control District. As DDE, RJ Behar reviews plats, applications for water management work permits, paving and drainage plans, as -built plans, and permit renewal applications for conformance with the District's drainage regulations, standards, procedures, and design criteria. RJ Behar also provides other services including drainage criteria, manual updates, special studies, data collection and monitoring, computer modeling, geographic information systems, master planning, design, permitting, cost estimating, construction inspection services, facilities financing, facilities operations and other services as directed by the District. Permit reviews are conducted and verified against District criteria. RJ Behar also participates in the District Board Meetings as representative to the District. RJ Behar also completed the permitting of the new Northlake Bridge over the Loxahatchee Slough in Palm Beach County. The project included work in very sensitive wetlands for construction of berths, a new weir, and canoe facilities. For SE 3b Street Reconstruction in the City of Belle Glade, RJ Behar obtained permits from the SFWMD and the South Florida Conservancy District (SFCD). Services included drainage design, utility relocation plans, and water and sewer plans to be constructed as part of the roadway improvements 1� R.J.Behar RFQ No. 14 -07 -02 1 Page 12.9 G Continuing Professional Services for Architectural, Landscape Architectural, Engineering and Land Surveying Firm Only (CCNA) - RFQ No. 14 -07 -02 In addition, RJ Behar has obtained permits from the Department of Environmental Resources Management (DERM) in Miami -Dade County. PUBLIC SECTOR ENGINEERING/GRANT AND FUNDING ASSISTANCE RJ Behar has extensive knowledge with public sector engineering. We understand the governmental engineering process, the bid process, contract administration and working with city councils and county commissions associated with municipal engineering. We have provided assistance in the preparation of State and Federal grant applications as well as the reporting requirements associated with the program management of different types of grants. RJ Behar has provided funding assistance to the City of Lauderdale Lakes and the Towns of Southwest Ranches and Davie. We have assisted in obtaining Florida Department of Transportation Local Agency Program (LAP) certifications. RJ Behar assisted the Town of Davie in obtaining FDOT certification for Local Agency Program (LAP) funding for town capital projects. RJ Behar prepared all the FDOT required documents for certification and coordinated with FDOT's LAP administrator as well as assisted the Town Council and Town Administrator during the certification process. - -_TOWN OF DAVIE - .LOCAL AGENCY PROGRAM We assisted the Town of Southwest Ranches in obtaining funding for the construction of the Stirling Road Loop Multipurpose Trail. The funding was obtained from the Metropolitan Planning Organization (MPO) and coordinated through Florida Department of Transportation and Broward County. The Town was awarded approximately $500,000 for this project. RJ Behar assisted the Town of Southwest Ranches in obtaining FDOT certification for Local Agency Program (LAP) for funding of town capital projects. We prepared all the FDOT required documents for certification and coordinated with FDOT's LAP Administrator. RJ Behar can research available Federal, State, Regional and local grant L programs including but not limited to TIGER 1, EPA Urban Waters , CBDG, SFWMD, and make recommendations to the City. Services can include preparing the applications; gather all required information, preparing documents for execution by the appropriate board, committee, and/ or governmental agency and shepherding the application through the review and award process. RJ Behar was the Engineer of Record on the following CDBG projects: • NE/NW 13th Street Streetscape — City of Ft. Lauderdale • NE 15th Avenue - City of Ft. Lauderdale • NW 440 Street Streetscape - City of Lauderdale Lakes • Palm Avenue Streetscape - City of Hialeah • W 74th Street - City of Hialeah • W 331d Street - City of Hialeah • E. Is' Avenue — City of Hialeah AIT11= RFQ No. 14 -07 -02 I Page 12.10 E Continuing Professional Services for Architectural, Landscape Architectural, Engineering and Land Surveying Firm Only (CCNA) - RFQ No. 14 -07 -02 Some of our public sector clients include: City of Sunny Isles Beach, City of Coral Springs, City of Sunrise, City of Lauderhill, City of Tamarac, City of Lauderdale Lakes, City of Miramar, City of Hialeah, City of Miami, City of Pompano Beach, City of North Miami, City of Fort Lauderdale, City of Lauderhill, Towns of Davie and Southwest Ranches, Village of Wellington, Broward County, Palm Beach County and Miami -Dade County. CITY MEETINGS/PUBLIC PRESENTATIONS In many of our projects, we have to deal with the general public. We make ourselves available to meet in the public's best schedule hours and at their preferred locations. We have performed public information programs for the FDOT on our highway projects. We can prepare materials for presentations including digital presentations, boards, handouts, etc. and have scheduled public meetings, workshops, and meetings with officials, politicians and general public. In our previous projects, we have dealt with staff members from different departments, service centers, constructions, operations, etc. and have successfully completed tasks in close coordination with staff. IM-7 We have prepared Community Awareness Plans and Public Involvement Plans for Ihs-f� sensitive projects. These plans identify the project stakeholders, community I representatives, and City, County and local officials. The plan also identifies the need for meetings, whether individually, in groups, or public meetings/workshops and the action plan. then should be included as part of the project schedule. DOCUMENT CONTROL Document control is very documentation. RJ Behar These meetings important. All administrative procedures and legal protections require proper care of understands matching documentation requirements with any size project. We use a straightforward system for prioritizing, routing and maintaining the necessary project documentation. Besides memos and meeting minutes, there are contract documents, plans, specifications, operation manuals, survey data and invoicing that will all need to be routed to their proper locations within the City system. RJ Behar has worked with a number of public agencies and municipalities since its inception and is adept at organizing project documentation using the client's methods, procedures and formats. We are familiar with most document formats used in engineering documentation and will easily adapt to requirements of the City early in the project. Please refer to Section 4 for a more in -depth look at budgeting, schedules, staff commitment, etc. RFQ No. 14 -07 -02 1 Page 12.11 Continuing Professional Services for Architectural, Landscape Architectural, Engineering and Land Surveying Firm Only (CCNA) - RFQ No. 14 -07 -02 Company Licenses: R.J. Behar & Company, Inc. State of Florida Department of State I certify from the records of this office that R.J. BEHAR & COMPANY, INC. is a corporation organized under the laws of the State of Florida, filed on October 4, 19W The document number of this corporation is P99000088184. 1 further certify that said corporation has paid all fees due this office through December 31, 2014, that its most recent annual report/uniform business report was filed on January 9, 2014, and its status is active. 1 further certify that said corporation has not filed Articles of Dissolution Given under my hand and the Great .Seal of the State of Florida at Tallahassee, the Capital, this the Ninth day of January, 2014 Secretary ojState Authentication ID: CC82670.%'JM To authenticate this ce tificatarisit the foaoa ing site.enter this ID, and then folbw the instructions displaced. https: / /crikwnbi7 orrfmnauth,er.html RFQ No. 14 -07 -02 1 Page 12.12 I] C Continuing Professional Services for Architectural, Landscape Architectural, Engineering and Land Surveying Firm Only (CCNA) - RFQ No. 14 -07 -02 n. State =ofa1`orida may, . I 7 Boor )of Prof ssionofEngineers . Attests that is authorized under the provisions of Season 7 0_b' F o�ido_Stotura, to offer engineering servitor to the public through a Profeutotiol Engiocer,.dulg.66i*niedlu`n&i Chapter 471, Florida Statutes. Expiration: 2( -8201 S �` —" li y'4: , 1.`�*'V CA tic. No: Audit No: 228201500534 Certificote of.Authoiiiation 8365 State'o .: lor id Boord o `Prd 'i -fdl- Engia neers r Attars shot { Ro�beri I ose;Behor, P:E is licensed os a Orofesstorrof _ glneerundCIO opter 471; Florida Siatutes 6 n: pirwi _ M2015 ��_L f,".. i. � �''� P.F lie. No: Audin No: 22y2o15o11T( 21755 Stat Is licensed as a Professional I Expiration: 212 &2015 Audit No: 2 28 2015 18549 A, III = .1 -F.1 Attests that ;Rodriguez; ET V14 ngineer,uridecCh 1h7j6Z. �.t' RE. Ater 471, Florida Statutes P.E. tic No; 48264 RFQ No. 14 -07 -02 1 Page 12.13 Continuing Professional Services for Architectural, Landscape Architectural, Engineering and Land Surveying Firm Only (CCNA) - RFQ No. 14 -07 -02 State,'e f�llorida Cry t G 4 rte. Board$oF Professional Engineers Attests that ` Anthony,',,llaughn Alfrdd;,P.E. Angincer 1 �Is licensed as a Professional: �undcr Chapter 471, Florida Statutes Expiration: 21282015 .-':' -= P.E Lk. No: A,& Nm 228201522165 1 '• 51857 1� R.J.Behar RFQ No. 14 -07 -02 1 Page 12.14 0 Continuing Professional Services for Architectural, Landscape Architectural, Engineering and Land Surveying Firm Only (CCNA) - RFQ No. 14 -07 -02 State4f 41L lorida B_oar'd of`Professlon IThg.ineers' f im`t;rs that Vet Mig el; P��_E�! G v s n v Is licensed as'a- Professional'- nglheeK Chapter 471; flonda Statutes ' aptrattun: 8/2015 ' `4V 5�^� P.E. Lic. No: - Audit No: 2282015335031. WE 1' . �- - "77028 Staterof =F1 Boaratbf Professional l r- Attests that Elmerar;Cardehas 3'r ` F -BPti r wra Is licensed as a Professional e,ineer under CI Expiration: 2/282015 �t 'j" �9�j�jJt�LG r; Audit No: 228201510293 X11 14T. °- rida Ater 471, Florida Statutes P.E. Lic. No: 62988 Staten �'�f °lorida Boor&bf Professional Engineers E, /} Attests that kHah'sJ'Mum, PE:: Is licensed as a Professional ngineergun e-,' 4ter 471, Florida Statutes Expiration: 2282015 � — - ' -- h t P.E. Lic. No: Audit No: 228201523787 ''1 D; r 1 67767 R.J.Behar RFQ No. 14 -07 -02 1 Page 12.15 0 Continuing Professional Services for Architectural, Landscape Architectural, Engineering and Land Surveying Firm Only (CCNA) - RFQ No. 14 -07 -02 State of .Florida Boord-of Professional Engineers Attests that Paola'Arigel'ica Riverosi P.E. Is licensed as a Professional I �neerl(tinde 'r`Ghopter 471, Florida Statutes Expiration: 22812015 "'T ' P.E. Lic. Na Audh Nm 228201530319 74249 fir VIM ,, j, States 'f F$1 0rida Board of P,�ofessI I ona En gineers. g�w Jasmam� =Riveron�P�E. h Is licensed as a Professtanol- ngipcc6un�der. opeer 471, Florldo Stoitites• Expiration: 7/2 912 0 4 5 r"..,ie(1, p E'L : Ns AWit No: 228201507058 �.7i} 'l'r1 � 73798 State �o`f `tih®rida Boo rdfofTrof'esiiondl Engineers a;.iit'scs iliac' I' ii 1� David ;.Gus'tavo,Romano; P.E. Is licensed as a Profess' rofe sio of nE gmeer under JCliapter 471, Florida Statutes Expiration: 2282015 ,1' ��V'rT RE Lies No: Audit No: 228201508128 63817 RFQ No. 14 -07 -02 1 Page 12.16 \" F Continuing Professional Services for Architectural, Landscape Architectural, Engineering and Land Surveying Firm Only (CCNA) - RFQ No. 14 -07 -02 State,.. Boar��o�Profess anal En sneers iAttests that rr twai'!, Jecry� 1ccolo'Jr Is licensed as a Professionol,Eng7neeh :underSChoPter 471, Florida Statutes Expiration: 2!282075 '1•'' {' P. Expiration: No: Audit No: 228201567202 COgj�'�' 22979 State o :f F,Iorida Boar& f Pcofesslonal En`glneers Aci'cits Wot RalfaelhEw�De A�azoza, �P.:E Is licensed as a Professional' nginee under Chapter 471, Florida Statutes Expiration: 2128/2015 ���.- �i"" P.E Lic. No: Audit No: 228201303727 �-k_ 24487 RFQ No. 14 -07 -02 1 Page 12.17 El Continuing Professional Services for Architectural, Landscape Architectural, Engineering and Land Surveying Firm Only (CCNA) - RFQ No. 14 -07 -02 Longitude Surveyors, LLC State of Florida Department of State I cenify from the records of this office that LONGITUDE SURVEYORS, LLC, is a limited liability company organized tinder the laws of the State of Florida, Sled on March 12, 2004. The document number of this company is L04000019574. I further certify that said company has paid all fees due this office through December 31, 2014, that its most recent annual report was filed on May 1, 2014, and its status is active. Cds undermy handandthe Cotw Sea/ of &e State of Ftorddc at TaMakaaey &e Capes &tr &e F&n day ofMgg 2014 ju `�� WE Secretary of State 14 R.J.Behar Authtntketlon ID: CU99654VZM To autheotkate this certnc&w,vlsh the faUOwhg shgenterthis [D, and then fallow the ft=ualms displayed https:ttef i&s=bh.argtc r thver.huW RFQ No. 14 -07 -02 1 Page 12.18 `t. 11 (V Continuing Professional Services for Architectural, Landscape Architectural, Engineering and Land Surveying Firm Only (CCNA) - RFQ No. 14 -07 -02 Florida De(nnsnent of Agrictdtme mrd Consumer Services Division of Constrner Services i i' Board of Professional Strveyors end Mappers 2005 Apalachee Pkway T nnhoss... Florida 323996500 800HELPFLA(435 -7352) or (850) 48&2221 0�.. �' December 6, 2012 LONGITUDE SURVEYORS. LLC 4055 N.W. 97 AVENUE SECOND FLOOR DORAL, FL 33178 SUBJECT: Professional Surveyor and Mapper Business Cetificate /i LB7333 Yom applicatim / rmewal m e profmsional mrveym and nipper busimm m ruprued by Chaney 472, Flaida Simta, has been meived and processed The license appears below and is valid through February 2& 2015. Ym are required to keep your hdbemetion with the Board aarern Please visit our websde at www.800helpBaxom/pnn to create your online account Ifym have already treated ynr online account. you can use the website to maintain your license. Ym can also fnd other valuable hdomumion on the website Ifym have any questions, Please do not hesitate to n0 the Division of Camrrner Services, Bond of Profesiaml Strveyors and Mappers at 800435.7352 or &50-48 &2221. sf—rn sN (t ; :ft :fit '- 4- Flar14 Depar ®me rt Agfmtm'e m Cmestmer SeeHCea DM eaaNa Cma®erbe and Lcurse Nn:LB7335 Bona Prdemmrabaaaem m4 iNappen 200! Aparat4ae PbrV TG�e. Florlaa ltlfa -ae40 ExP�m Date Fetvuary 28, 2015 Professional Surveyor and Mapper Business License Under the provisions of Chaney 471 Florida Statutes LONG=E SURVEYORS LLC 40M N.W. 97 AVENUE SECOND FLOOR DORAL FL 33178 ADAM H. PI AM CQMMISSIO\TR OF AGAICUL7 rm.�e.mrye.. a.saemme o..eru aeewar . m: �. e.emew.<me.e.fe.euarae+u.wmaer max sin nmmssa� a n 1. . =.- RFQ No. 14 -07 -02 1 Page 12.19 1] El �I Continuing Professional Services for Architectural, Landscape Architectural, Engineering and Land Surveying Firm Only (CCNA) - RFQ No, 14 -07 -02 Florida Department of Agriculture and Consumer Services Division of Consumer Services Board of Professional Surveyors and Mappers Y. 2005 Apalachee Pkway Tallahassee, Florida 32399-6500 �t SOOHELPFLA(435 -7352) or (850) 488 -2221 9 y ~�x2tV' March 12, 2013 EDUARDO M SUAREZ 4055 NW 97 AVENUE IND FLOOR DORAL, FL 33178 Professional Surveyor and Mapper License Under the provisions of Chapter 472, Florida Statutes EDUARDO M SUAREZ 4055 NIV 97 AVENUE 2ND FLOOR DORAL, FL 33178 ADAM H. PUITAM COMMISSIONER OF AGRICULN Tb u bxMt au iae pr4vmi men W �+�� me � Y1ree R Ww COS a 4u[<n mpel d qqn ll`- Wm sum RFO No. 14 -07 -02 1 Page 12.20 Datam Hae SUBfECr: Pmfessimul Surveyor and Mapper Littrtse#LS6313 Florida Department of Agriculture - and Coosnmer Senieas Y' oar applirtion /renexal a5aprolrss_prul surveyor and mapper __ .. Board of Professional Son'eyors as required by Chapter 47?, Florida Susuus, f aT been teceit� and _ and Mappers processed. 156313 The license appears below and is valid through February 28.201 S. Prof¢siaml Surveyor A Mapper You are required to keep your information with Or Board current. . EUUARDD M SUAREZ please visit our wabske at www.800helpfIaco.Wpsm to mate your online account. If you have already armed your online account. you ran use the website to maintain your license. You can also find other IS DCENSED under the provisions of Ch. 472 FS valuable taformation on the website. Ecpirnim dae: Fehruay 26.' -015 U you have any questions, please do not hesitate to call the Division ----------------------------------------- of Consumer Services, Board of professional Surveyors and Mappers at 800- 135-7352 or 850-788 -2221. Demuth Mme Florida Departvat a Airwulm and Camuver Saniras r Division of Consumer Servim License No.: IS6313 — _ _Retard of PrnfuwiiomlSpnrtvrs and Alappen _ E;pimtion !}ate:_ February 28.. 2015 2005 Ap darner Pk�iy-7'a l.h Florida 323996500 - Professional Surveyor and Mapper License Under the provisions of Chapter 472, Florida Statutes EDUARDO M SUAREZ 4055 NIV 97 AVENUE 2ND FLOOR DORAL, FL 33178 ADAM H. PUITAM COMMISSIONER OF AGRICULN Tb u bxMt au iae pr4vmi men W �+�� me � Y1ree R Ww COS a 4u[<n mpel d qqn ll`- Wm sum RFO No. 14 -07 -02 1 Page 12.20 11 1 Continuing Professional Services for Architectural, Landscape Architectural, Engineering and Land Surveying Firm Only (CCNA) - RFQ No. 14 -07 -02 rttE Florida Depanrrienl of Agriculture and Consumer Services Division of Consumer Services r Board of Professional Surveyors and Mappers 2005 Apalachee Pkxay Tallahassee. Florida 32399 -6500 SOOHELPFLA(435- 7352) or (850) 488 -2221 A�.a sr}s March 12. 2013 EDUARDO M SUARF7. 4055 NW 97 AVENUE 2ND FLOOR DORAL. FL 33178 SUBJECT: Professional Surscyor and Mapper License R LS6313 Your application / mneual as a professional sangvr and mapper as required by Chapter 472. Florida Statutes. has Men received and processed. The license appears Mau and is valid through February 28.'- -015. You am required to keep your infnmation aid the Board current. Plea¢ visit our sebsite .1 uw�.Soohelpfh.eom/psm m create )am online account. If sou have already created )our online accouaL )ou can use the ucloile to maintain you license. You can also find other caluablc infomtation on the x,bsuc. If you have any questions. please do trot hesitate to call the Division of Couwmer Services. Board of Profmionel Sunny and Mappen at 800 -435 -7352 or850- 488.2221. Damdn Hen Florida Department of Agriculture and Co.., Senices Board of Professional Sune)om oad 5lappen 1_56113 Professional SunGor eM 51alrper EDUARDO M SUAREZ IS UCESSED uader de posisiom of 17h. 472 FS Eapoani. date: Rhaany 28. MI5 Det.'Z Hine Tlurids Department or, AaricNUVe and Camurter Senior Didaan of C.Senicc Liccn.e No.: IS6313 v Itvrd of Pnofe"dmul Sonetors anal Mappers Erpiratinn fhte. Fehruarv'_R. 2015 2005 Apalaebee Pkxa) Tsrl M . Fbrida 323Y9b5ao �4.reo Professional Surveyor and Mapper UceDse Under the pass isions of Chapter 472. Florida Statutes EDUARDOSISUAREZ 4055 NN' 97 AVENUE 2ND FLOOR DORAI„ FL 33178 ADAM 11. PUFNA)•1 COMMISSIONER OF AGRICVLTVIIE m.no �swu. pdeu4xi.v.e.vm•sr�•e.e�..a mean seam. n.e .6ia.aenwmq Oqv m_ra..m smaa q� R.J.Behar RFQ No. 14 -07 -02 1 Page 1 221 l Continuing Professional Services for Architectural, Landscape Architectural, Engineering and Land Surveying Firm Only (CCNA) - RFQ No. 14 -07 -02 E Sciences, Inc. State of Florida Department of State I certify from the records of this office that E SCIENCES, INCORPORATED is a corporation organized under the laws of the State of Florida, filed on August 29,2000. The document number of this corporation is P00000081584. I further certify that said corporation has paid all fees due this office through December 31, 2014, that its most recent annual report/uniform business report was filed on January 2, 2014, and its status is active. I further certify that said corporation has not filed Articles of Dissolution. R.J.Behar Cdstea render nV band and Me C.-eal Seal of&e Stafe of Florida al TaUmha ree Ae Capbm4 9k& be Second clay oj.lanaaay, 1014 6014 04 Secretary of State Auth ntkrtim ID: CODISR7709M To authentke this certltiwte,visk the tatbwbg dtgrox rthis ID, end then rotbw the b s abas displaye& hip sdierileambh.arg/certnsthverlvx d RFQ No. 14 -07 -02 1 Page 12.22 Continuing Professional Services for Architectural, Landscape Architectural, Engineering and Land Surveying Firm Only (CCNA) - RFQ No. 14 -07 -02 RICK SCOTT, GOVERNOR KEN LAWSON, SECRETARY STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF PROFESSIONAL GEOLOGISTS Under the provisions of Chapter 402 FS. - Exontoon date: JUL 31, 2016 E SCIENCES, INCORPORATED-' 34 EAST PINE STREET�' -!'-� - _ORLANDO FL: 32801 Issue(: of 11=14 DISPLAY AS REQUIRED BY LAW Stat Boar is authorized under the p to the public through a P Expiration: 2/28/2015 Audit No: 228201503609 f�1n F�.7 «horida Professional :.Engineers . Attests that i fences, incorporated P Jc lw .023;'Florido Statutes, :o offer engineering services . ily'IicefLsed u der Chapter 471, Florida Statutes. Authorization 8691 AC>..61.14.159.. •.. .STATE OFFLORIDAt, n 'r 1 _ i.DBPARTMEN7 OF BUSINESS-AND PROFESSIONAL REGIILATION ,BOARD,_OF•PR0FESSIOXAL GEOLOGISTS $EQ#L1]0430011 LICENSE NBR ��WF ati:'4.. `. .. 04/30/2012.118179757 G8416 .!� "3jsE•'i: The GEOLOGY-BUSINESS �tcj�` �y-,ryp,,�r v� :Named below IS. CERTIFIHD (4 � ''r Under the•piovisione of.'Chapter - }92 PS' V'999 Expiration date: JUL 31, 2014.; I1 r s? _E S S P °INCORPORATBD EAST 34 EAST T PIKE NET ORLANDO PL 32801,<1'•r.;;_r RICK SCOTT KEN LANSON GOVERNOR DISPLAY AS REQUIRED BYLAW SECRETARY 8 RFQ No. 14 -07 -02 1 Page 12.23 SEa• Lu861100013TB F�.7 «horida Professional :.Engineers . Attests that i fences, incorporated P Jc lw .023;'Florido Statutes, :o offer engineering services . ily'IicefLsed u der Chapter 471, Florida Statutes. Authorization 8691 AC>..61.14.159.. •.. .STATE OFFLORIDAt, n 'r 1 _ i.DBPARTMEN7 OF BUSINESS-AND PROFESSIONAL REGIILATION ,BOARD,_OF•PR0FESSIOXAL GEOLOGISTS $EQ#L1]0430011 LICENSE NBR ��WF ati:'4.. `. .. 04/30/2012.118179757 G8416 .!� "3jsE•'i: The GEOLOGY-BUSINESS �tcj�` �y-,ryp,,�r v� :Named below IS. CERTIFIHD (4 � ''r Under the•piovisione of.'Chapter - }92 PS' V'999 Expiration date: JUL 31, 2014.; I1 r s? _E S S P °INCORPORATBD EAST 34 EAST T PIKE NET ORLANDO PL 32801,<1'•r.;;_r RICK SCOTT KEN LANSON GOVERNOR DISPLAY AS REQUIRED BYLAW SECRETARY 8 RFQ No. 14 -07 -02 1 Page 12.23 E Continuing Professional Services for Architectural, Landscape Architectural, Engineering and Land Surveying Firm Only (CCNA) - RFQ No. 14 -07 -02 RICK SCOT[. GOVERNOR KEN LAWSON. SECRETARY STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL REGULATION BOARD OF PROFESSIONAL GEOLOGISTS 4 PGEa] The PROFESSIONAL GEOLOGIST'S -w.�+% Named below IS LICENSED Under arc provisions of Chapter 492 FS. - Expiration data JUL 31. 2016 GERTENBACN, PATRICIA (:-y'e't - 1683 NW 16TH STREET :7� — - -...�� PEMBROKE PINES 33026' `" Tt \��• 1a5UE6 o$onor� DISPLAY AS REQUIRED BYLAW SEOS u�l= State, ofp11 °orid a Board of Piofesslonal Engineers Y Q� Nadia Guertin-Locke iRM. Is licensed as a Professional gmeeF undertChapfer 471, Florida Statutes Expiration; 228/2015 ' +,'1' "' �;_.1�,•t17ri �'FO.; "' P.E. Lic No: Audit No: 228201510135 �`'' -'aPp v1-1, -,- 58676 State::l�og�a ional -Ei I that Tida Is licensed as a Professional' ngineeraunder?Ghapier 471, Florida Statutes Expiration: 2/28(2015 1' 7*l? _ - P.E. Lic No: Audit No: 228201510739 hurt 1A -1 ii . 73008 RFQ No. 14 -07 -02 1 Page 12.24 Continuing Professional Services for Architectural, Landscape Architectural, Engineering and Land Surveying Firm Only (CCNA) - RFQ No. 14 -07 -02 Professional Services Industries, Inc. s d nmd, a d Esc rdid� n szwssne Professional Service Industries, Inc. 1901 S. MEYER.S RD. STE. 400 ATTN: LINDA ELLIS OAKBROOK TERRACE, 1L 60181 Each licensee is solely responsible for notifying the Florida Board of Professional Engineers in writing the licensee's current address. Name changes require legal documentation showing name change. An original, a certified copy, or o duplicate of an original or certified copy of a document which shows the legal name change will be accepted unless there is a question about the authenticity of the document ® raised on its face, or because the genuineness of the document is uncertain, or because of another matter related to the application. At least 90 days prior to the expiration dote shown on this license, a notice of renewal will be sent to your last known address. if you hove not yet received your notice 60 days prior to the expiration date, please call (850) 521 -0500, or write, Florida Board of Professional Engineers, 2639 North Monroe Street, Suitc B- 112,Tallahassce, FL 32303 -5268 or e-mail: boord@fbpe.org. Our website address is hap: / /www.fbpe.org. State of .Florida Board of Professional Engineers Attests that Professional Service Industries; Inc. FBPE is authorized under the provisions of Secnon' 71.023, Florida StcSttes, to offer engineering scrvices to the public through a Professional Engineer, duly-licensed.vnder Chapter 471, Florida Statutes. Ah qW 14 R.J.Behar RFQ No. 14 -07 -02 1 Page 12.25 C Continuing Professional Services for Architectural, Landscape Architectural, Engineering and Land Surveying Firm Only (CCNA) - RFQ No. 14 -07 -02 Sate �o�f`F�horcla Boardjof=Professionol =Engineers ts, at, Dhuruv'�aBadrlsP�E: Is licensed as a Professlonol�Eri nee'r under;CkdAter 471, Florida Statutes, - Expiration: 228/2 P 015 '�,�� P.H.:Lic Audit No: 228201523899 _ "�!U_ y�r�; _ 68718 L 9 1� State�+o_ j- �F�l p? ri a Boardyof Professional Engineers ° r, � .r Attests shot Y F� Pauh�DA�P- asse�,P Ebp Is licensed as a Professional -ngmeergunderJChaPter 471, Florida Statutes Expiration: 2282015 -� �ta�.� -d- LE'' P.E. tic. No: Audit No: 228201515122 �4A�tl y}T 34750 RFQ No. 14 -07 -02 1 Page 12.26 C `J J I CLIENT Town of Davie 6591 Orange Drive Davie, Florida 33314 -3399 Mr. Larry A. Peters, PE Town Engineer Tel: (954) 797 -1114 RJ BEHAR'S ROLE Local Agency Program (LAP) Certification Services PROJECT STARTED: 1012005 PROJECT COMPLETED: 1212007 DESIGN CONTRACT DURATION: N/A COST /FEES PAID: $8,000 CONSTRUCTION COST: Unknown CHANGE ORDERS: I VALUE OF CHANGE ORDERS: 35,000 RJ BEHAR'S KEY PERSONNEL Robert J Behar, PE Principal in Charge Javier Rodriguez, PE Project Manager RJ Behar assisted the Town of Davie in obtaining FDOT certification for Local Agency Program (LAP) funding for town capital projects. RJ Behar prepared all the FDOT required documents for certification and coordinated with FDOT's LAP administrator as well as assisted the Town Council and Town Administrator during the certification process. R.J.Behar & Company, Inc. ICt��I Engineers • P l a n n e r s RFQ No. 14 -07 -02 1 Page 12.27 El 11 L J I CLIENT p��:vas Florida Department of Transportation, District 6 1000 NW 111 Street Miami, Florida 33172 Mr. David Mendez, PE Tel: (305) 470 -5207 Fax: (305) 470 -5547 david.mendez@dot.stalefl.us RJ BEHAR'S ROLE Roadway plans, public involvement, traffic control, drainage improve- ments, signing & pavement markings, utility coordination and permitting PROJECT STARTED: 1212000 PROJECT COMPLETED: 1212002 COST /FEES PAID: $432,000 CONST. COST: 54,000,000 RJ BEHAR'S KEY PERSONNEL Robert J. Behar, PE Principal in Charge Israel Magrisso, PE Project Manager Juan H Vazquez, PE, PH, BCEE Drainage Engineer Maikel Gonzalez, PE Project Engineer Adrian Gonzalez, El Project Engineer The scope of the project included preparing construction drawings for 4 miles of major arterial resurfacing. The construction included resurfacing the existing road and implementing drainage improvements using injection wells and gravity wells at 19 locations; 14 pump stations and 28 injection wells were designed. The plans included pump station design, pollution control structures, electrical design and all details for the pressurized injection wells. The project also included extensive public involvement, new pavement markings, traffic control plans and utility coordination. A CDS surface water treatment proprietary basin was designed for this project to treat the stormwater before discharge. The CDS basin was designed to remove 80 %ofpolluianis from surface waters. R.J.Behar & Company, Inc. II' Engineers. Planners RFQ No. 14 -07 -02 1 Page 12.28 C C J I CLIENT City of Miami Beach 1700 Convention Center Drive Miami Beach, Florida 33139 Mr. Jorge Chartrand Projects Director Tel: (305) 673 -7071 iorgechartrand(a�m iam ibeachAgot RJ BEHAR'S ROLE Civil and drainage design, including extensive public involvement, comprehensive neighborhood improvements: • Streetscape (Beatification) • Roadway improvements • Complex Drainage improvements • Waterline replacement PROJECT STARTED: 2001 PROJECT COMPLETED: 2007 COST /FEES PAID: S 236,400 CONST. COST: 53,000,000 RJ BEHAR'S KEY PERSONNEL Robert J. Behar, PE Principal in Charge Richard Bolt Project Manger Juan H. Vazquez, PE, PH, BCEE Drainage Engineer Paola Riveros, El Project Engineer Morgan Villanueva, PE Structural Engineer The scope of this project included preparation of the stormwater management design for neighborhood improvement programs. The program included repaving and stripping, streeiscape, drainage improvements and water and sewer improvements. The first phase, Bay Road improvements, included complete reconstruction of the roadway segment. The geometric design included two roadway lanes, parking lanes and bulb outs for traffic calming. The pavement reconstruction included a geotextile layer for reinforcement of soft soils. The project was challenging due to the low elevations, soft soils and numerous utilities within the right -of -way. RJ Behar also participated in the public involvement workshops and provided bidding assistance. U BEFORE ItR.J.Behar & Company, Inc. � Engineers. Planners RFQ No. 14 -07 -02 1 Page 12.29 0 E 0 J. 11 CLIENT The scope of services included review and approval of development Town of Southwest Ranches site plans and building permits, site inspections, survey of sites, soil 13400 Griffin Road borings and plat processing coordination/preparation. Southwest Ranches, FL 33330 Tel: (954) 343 -7441 RJ Behar was also the Town's engineering representative with Fax : (954) 434 -1490 regulatory agencies, zoning and permitting. We provided capital engineering project oversight, design and permitting, review of capital engineering implementation and planning, overview of RJ BEHAR'S ROLE roadway, bridge and trail development. inspection services, reviewed all building permits, fill permits, and RJ Behar prepared tertiary drainage design, permitting, developed cost estimates, prepared coordination and drainage plan update. We also provided water construction documents quality management, L-AP certifications, coordinated with Town's Planner during the zoning and permitting process and expert testimony on behalf of Town for court and code enforcement PROJECT STARTED: 2004 proceedings. PROJECT COMPLETED: 2010 DESIGN CONTRACT DURATION: N/A COST /FEES PAID: Varied monthlyi according to the reviews !` CONST. COST: N/A - CHANGE ORDERS: None �f• VALUE OF CHANGE ORDERS: N/A ``'' 1 RJ BEHAR'S KEY PERSONNEL Javier Rodriguez, PE Project Manager _ t Paola Riveros, PE ~ Plans Production I Richard Bolt Permit Review Daimian D. Leslie, El Project Engineer Claudia M. Lamus, PE "R TraffcAnalyses Gaston Baranda Permitting (.' Carlos Hernandez, PE � F Inspection Engineer = ' IV �.'G,.^ via .1 Ti R.J.Behar & Company, Inc. Engineers. Planners RFQ No. 14 -07 -02 1 Page 12. 30 11 J I=Il CLIENT City of Lauderdale Lakes 4300 NW 36`" Street Lauderdale Lakes, FL 33319 Mr. Mann), Diez Public Works & Development Manager Tel: (954) 535 -2778 Fax: ( 954) 733 -4120 Email: mannyd(lauderdalelakes.org RJ BEHAR'S ROLE Civil engineering consultation, construction management services, plans review, and weekly inspection services PROJECT STARTED: 2006 PROJECT COMPLETED: 0611010 DESIGN CONTRACT PERIOD: N/A COST/ FEES PAID: Varies per year ® CONST. COST: N/A CHANGE ORDERS: None VALUE OF CHANGE ORDERS: N/A 11 RJ BEHAR'S KEY PERSONNEL Robert Behar, PE Principal in Charge Javier Rodriguez, PE City Engineer The scope of the project consisted of providing professional civil engineering consultation to the City of Lauderdale Lakes Engineering and Construction Management Services Division regarding plan development reviews and associated engineering activities. Responsibilities included: Oversaw the checking and inspecting of maps and plans submitted by private developers and contractors, Provided consultation on the preparation and administering contracts with the City's engineering and construction management division, Responded to inquiries and complaints regarding public works and engineering functions, Met with individuals and community organizations concerning the operations and activities of the engineering department's functions, Made recommendations on policies and procedures affecting building construction projects and related engineering services, Inspected project sites to monitor progress and ensure conformance to design specifications and safety or other related standards. The project also consisted of engineering plans review and inspection services for small and large scale projects ranging from a single-family driveway to a 10 plus acre commercial site. -W R.J.Behar & Company, Inc. Il�1�T11 Engineers • Planner s RFQ No. 14 -07 -02 1 Page 12.31 J� CLIENT Broward College 3501 SW Davie Road Davie, Florida 33014 Mr. Francisco Hoyos Director Facilities Management Tel: (954)201 -6975 Fax: (954) 201 -6976 ovosnbroward.edu RJ BEHAR'S ROLE Civil engineering services, land development, drainage, and permitting PROJECT STARTED: 2006 PROJECT COMPLETED: 2006 COST /FEES PAID: $29,000 (Design) CONST.COST:$150,000 (Estimate) CHANGE ORDER: RJ BEHAR'S KEY PERSONNEL Robert J Behar, PE Principal in Charge Javier Rodriguez, PE Project Manager Daimian D. Leslie, El Project Engineer lJ The scope of this project consisted of the design of additional parking for the Tiger Tail Water Sports Center. The project area is located within the City of Dania Beach. RJ Behar provided the land development, drainage, permitting and civil engineering services. R.J.Behar & Company, Inc. I!_tf�Tll Engineers • P l a n n e r s RFQ No. 14 -07 -02 1 Page 12.32 ,J 11 11 J� CLIENT Broward County Water and Sewer Services Department Subconsultantto: Miller Legg and Associates 6301 N. W. 5`" Way, Suite 1400 Fort Lauderdale, Florida 33309 Mr. Darren Badore Tel: (954) 491 -2800 Fax: (954) 491 -0788 dbadore@,miller-leZQ.com RJ BEHAR'S ROLE Consultant for drainage construction management review services RJ Behar provided drainage design; cost estimating of the drainage system; permitting of the drainage system; and peer review of. • Water distribution plans, • Sewer distribution plans, • Water reuse master plan, • Water reuse design, • Streets and sidewalks plans. The peer reviews were being performed at each phase of the design. RJ Behar also provided construction management and inspection services during the construction phase. The drainage design consisted of evaluation and identification of the food prone areas, field reviews, data collection, coordinated with the design, geotechnical subconsuliant, hydrologiclhydraulic modeling and plans and peer preparation of the drainage improvements. The drainage system consists of a system of exftltration systems, the addition of drainage catch basins, control structures with weirs and connection to existing outfalls. PROJECT STARTED: 31512007 PROJECT COMPLETED: 7/15/2013 Cost /FEES PAID: 8881,268.00 CONST. COST: 888,000,000 (Est) RJ BEHAR'S KEY PERSONNEL Juan H. Vazquez, PE, PH, BCEE Engineer of Record Carmen A. Aponte, MSE, CEI Project Engineer Paola Riveros, PE Project Engineer Anthony V. Alfred, PE Peer Reviews Sonia M. Torres, PE Peer Reviews Sandra Sequeira, MS, EI Project Engineer RJ Behar also coordinated permitting with the Florida Department of Transportation (Chapterl4 -86), Broward County Environmental Protection Department and South Florida Water Management District. O R.J.Behar & Company, Inc. II�tJTII Engineers. Planner s RFQ No. 14 -07 -02 1 Page 12.33 C 11 11 J- CLIENT Central Broward Water a X 4 Control District 8020 Stirling Road �•: • *' Hollywood, FL 33023 Mr. Mike Crowley District Manager Tel: (954) 432 -5110 Fax: (954) 432 -8603 RJ BEHAR'S ROLE District Engineering Services PROJECT STARTED: 412412007 PROJECT COMPLETED: Ongoing COST /FEES PAID: Varies CONST. COST: N/A RJ BEHAR'S KEY PERSONNEL Robert J Behar, PE Principal in Charge Javier Rodriguez, PE District Engineer Andrea Virgin, PE, LEED AP District Reviews Gary Tenn, PE District Reviews Rohan Punit, EI District Reviews Juan H. Vazquez, PE, PH, BCEE Technical Support The Central Broward Water Control District is a local government agency chartered by the State of Florida to provide secondary water management and stormwater drainage in southwest Broward County. Within its 45 square mile area, this special drainage district incorporates almost 107 miles of canals that are located within 6 cities and towns, as well as unincorporated areas of Broward County. Under this contract, RJ Behar serves as one of two firms who serve as District Drainage Engineers (DDE). As DDE, RJ Behar reviews plats, applications for water management work permits, paving and drainage plans, as -built plans, and permit renewal applications for conformance with the District's drainage regulations, standards, procedures, and design criteria. RJ Behar also provides other services including drainage criteria, manual updates, special studies, data collection and monitoring, computer modeling, geographic information systems, master planning, design, permitting, cost estimating, construction inspection services, facilities financing, facilities operations and other services as directed by the District. Permit reviews are conducted and verified against District criteria. RJ Behar also participates in the District Board Meetings as representative to the District. For this contract the deliverables mostly consist of comments to submitted permit packages. The responses are reviewed with senior engineers before submittal to the client. On complex reviews, peer review and consultation is also conducted to verify criteria and hydrologic - hydraulic analyses. All of the schedules, budgets, and deliverables were monitored using spreadsheets and scheduling software. Tasks are completed within the time and budgets allocated. [ENTRALBROWARI ATER,CONTROLDISTRICT R.J.Behar & Company, Inc. Ilt�Jl Engineers • P l a n n e r s RFQ No. 14 -07 -02 1 Page 12.34 0 LI J` CLIENT City of Sunrise 3495 N. Hiatus Road, Suite 200 Sunrise, Florida 33351 Mr. John Cowling, PE Project Manager Tel: (954) 572 -2486 icowl inencityofsunrise. ore RJ BEHAR'S ROLE Project management, site plans, and permitting PROJECT STARTED: 71612007 PROJECT COMPLETED: 1212009 COST /FEES PAID: 824,000 CONST. COST: 8426,000.00 RJ BEHAR'S KEY PERSONNEL Robert J Behar, PE Principal in Charge Javier Rodriguez, PE Engineer of Record /Project Manager Marlin Scattolini, El Project Engineer John Miller Construction Observation R. J Behar & Company was contracted by the City of Sunrise to provide engineering design services for the rehabilitation of the banks of the Springtree Canal, located between NW 83d Avenue and Fairway Road. The project included construction of approximately 900 linear feet of stabilization along the banks, maintaining a 4:1 slope above water level and 2.5:1 below the water level. RJ Behar provided project management, developed the site plans, coordinated with subconsuhants, obtained all the permitting and provided construction observation services. II14R.J.Behar & Company, Inc. Engineers • P l a n n e r s RFQ No. 14 -07 -02 1 Page 12.35 0 0 C J. CLIENT Broward College, Central Campus 3501 SW Davie Road Davie, Florida 33014 Subconsultantto: Cartaya & Associates, Architects, PA 2400 E Commercial Blvd., Suite 415 Fort Lauderdale, FL 33308 Mr. Juan Justiniano Tel: (954) 771 -2724 Fax: (954) 776- 4180 iiustiniano i J. r CLIENT City of Pembroke Pines Public Services Department 13975 Pembroke Road Pembroke Pines, FL 33027 Mr. George Wrves Tel: (954)435 -6581 Email: gwrves@ppines.com FDOT District 4 Ms. Sierra Evans FDOT Project Manager Tel: (954) 892 -1380 RJ BEHAR'S ROLE Construction Engineering Inspection and Management Services PROJECT STARTED: 1008 PROJECT COMPLETED: 2010 COsr /FEES PAID: 51,592,490.03 CONST. COST: $11.2 Million is CHANGE ORDERS: 12 - These were for additional work and unforeseen conditions TIME EXTENSIONS: 4 months FM #:41415225801 RJ BEHAR'S KEY PERSONNEL Robert J Behar, PE Principal in Charge David Romano, PE Senior Project Engineer Rafael Urdaneta, CCM Project Administrator Stacy Sookdew -Sing Resident Compliance Specialist Michael Owenby Senior Roadway Inspector Mauricio Pinzon Roadway Inspector The scope of this project consisted of an $11.1 million Local Agency Program (LAP) construction project between the City of Pembroke Pines and the Florida Department of Transportation, District 4. This was a federally funded project consisting of urbanized improvements to the 1 -75 (SR -93) /Pines Boulevard (SR -810) Interchange. The project included modifying the existing interstate overpass, entrance and exit ramps from a rural configuration to an urban configuration, as well as widening, signalization, landscaping, and access management improvements along Pines Boulevard. "No- excuse Bonus" (150K) and "Incentive/Decentive" contracting methods were utilized. RJ Behar provided full construction engineering inspection and management services. R.J.Behar & Company, Inc. IC�t�Tll Engineers • Planner s RFQ No. 14 -07 -02 1 Page 12.37 C I -1' CLIENT Town of Davie + 6591 Orange Drive Davie, Florida 33314 -3399 Mr. David Quigley Planning & Zoning Manager Tel: (954) 797 -1103 Fax: (954) 797 -1204 Email: david_quigley@davie fl.gov RJ BEHAR'S ROLE Traffic Study and Traffic Counts PROJECT STARTED: 113012009 PROJECT COMPLETED: 7 13112010 COST /FEES PAID: 534,219.00 CONST. COST: Unknown CHANGE ORDER: N/A RJ BEHAR'S KEY PERSONNEL Robert J. Behar, PE Principal in Charge Javier Rodriguez, PE Project Manager Claudia M. Lamus, PE Traffic Engineer Alexander Socarras, EI Traffic Counts /Data Collection Mariana Urdaneta Traffic Counts /Data Collection RJ Behar prepared a traffic study, on behalf of the Town of Davie, for a Land Use Plan Application to increase density within the Town's Regional Activity Center. The Town of Davie intended to increase the residential density by 3,500 dwelling units in the Regional Activity Center (RAC). The RAC is bordered by University Drive to the west, 1- 595 to the north, Florida's Turnpike to the east and Griffin Road to the south. The purpose of this project was to analyze the traffic impacts that the increase in density would have had on the roadway network. This analysis was used to respond to the two traffic circulation questions in the Town of Davie's LUPA application. The study included traffic counts, projections of the new traffic demand, and analysis of the existing and future operational conditions in the areas roadway network. (� R.J.Behar >£ Company, Inc. I!_t�Trl Engineers•PIanners RFQ No. 14 -07 -02 1 Page 12.38 E 1 J. X11 CLIENT Town of Davie 6591 Orange Drive Davie, F133314 Mr. Emilio DeSimone Project Manager Tel (954) 797 -1085 Emilio DeSimone@davie-fl.gov RJ BEHAR'S ROLE Civil engineering design services, site field review, construction drawings and permitting PROJECT STARTED: 0310912009 PROJECT COMPLETED: 513112013 CosT /FEES PAID: $37,955.00 CONST.COST: $325.000.00 RJ BEHAR'S KEY PERSONNEL Robert J Behar, PE Principal in Charge Javier Rodriguez, PE Project Manager Andrea Virgin, PE, LEED AP Project Engineer Rohan Punit, El Project Engineer RJ Behar was contracted by the Town of Davie to provide engineering design services for the Devine Estates property located at 3000 S. Flamingo Road in Davie, Florida. The scope of this project consisted of a multiuse typical equestrian and /or recreational trail and horse crossing within the Town of Davie. RJ Behar converted a portion of the Devine Estates Tree Nursery into an equestrian park. Site elements included a multiuse pedestrian/ equestrian trail, a gazebo overlooking the existing pond, design of a drainfteld for the proposed bathrooms, horse trailer parking, and a staging area for patrons and enclosure of the remaining tree nursery with associated maintenance access. Permitting entities included the Town of Davie, Central Broward Water Control District and Broward County Health Department. �(` ; t 3' <a.�� , —. � �" ., � •. "1., =� !fl If Ili -f— �..- '.�:ea �(` ; t 3' .t , `t Z, R.J.Behar & Company, Inc. II�JI Engineers. Planners RFQ No. 14 -07 -02 1 Page 12.39 C E Cl J CLIENT Town of Davie 6591 Orange Drive' Davie, Florida 33314 -3399 Mr. Keith Pursell Project Manager Tel: (954)797 -1191 Email: keith _pursell@davie fl.gov RJ BEHAR'S ROLE Civil engineering services, drainage, utility, improvements and site field visits, wetland implementation. PROJECT STARTED: 511412008 PROJECT COMPLETED: 0812012 COST/ FEES PAID: 8116,528.00 CO NST. COST: S1,100,000 RJ BEHAR'S KEY PERSONNEL Robert J. Behar, PE Principal in Charge Javier Rodriguez, PE Project Manager Andrea R. Virgin, PE, LEED AP Project Engineer Kelly Nowell, PE, LEED -AP Project Engineer Marlin Scattolini, EI Project Engineer Mariana Urdaneta CADD Technician The scope of the project consisted of site design, drainage, parking and utility improvements for an historical school (now converted to a museum) and an adjacent park property. The finished site boasts a 0.70 acre voluntary wetland, playground, passive park areas and facilities to host outdoor events. RJ Behar coordinated the site design, all the components of the plans and the permitting. The wetland planting plans were developed by a subconsultant. The wetland area has a sidewalk path, and is coordinated and connected to an elevated stage and playground. The grading included a marsh area and a deepwater marsh (constant pool), which has wetland species plantings in both areas. Species include small trees, Cigared Palms, shrubs and grasses. The existing trees within the site were carefully identified, protected and relocated. R.J.Behar & Company, Inc. 1 1 1 E n g i n e e r s • P l a n n e r s RFQ No. 14 -07 -02 1 Page 12.40 t„ = EAST 4TH AVENUE IMPROVEMENTS I x, CITY OF HIALEAH. FLORIDA— 'LAP /ARRA PROJECT G� CLIENT City of Hialeah 5601 East 8" Avenue Hialeah, FL 33011 Mr. Jorge E. Hernandez Project Manager Director, Streets Division Tel (305) 687 -1611 Fax (305) 687 -1631 E -mail: iehernandez@hialeahA.gov RJ BEHAR'S ROLE: Design, roadway improvements, milling and resurfacing, drainage, signing, pavement and markings plans PROJECT STARTED: 0512009 PROJECT COMPLETED: 913012009 COST/ FEES PAID: $48,264 CONST. COST: $636,630.79 PROJECT LENGTH: 1.239 miles RJ BEHAR'S KEY PERSONNEL Robert J Behar, PE Principal in Charge /Project Manager Rohan Punit, EI Project Engineer Marlin Scattolini Project Engineer Richard Bolt Project Engineer 0 RJ Behar was contracted by the City of Hialeah to provide roadway improvements on East 4th Avenue from Hialeah Drive to East 11" Street within the City of Hialeah. The scope of this project consisted of extensive field work in order to locate roadway deficiencies over the project's 11 block span. Milling and resurfacing, ADA improvements, curb, driveway and sidewalk repairs, utility locations, and signing and pavement marking repairs were some of the aspects documented for this project. This was a FDOT Local Agency Program (LAP) Project. One of the challenges on this project was to prepare roadway plans which would improve the roadway corridor while minimizing federal funds the City would have to use. This project was part of the American Recovery and Reinvestment Act (ARRA), which is supported by federal funds. Project length: 1.139 miles. ;L V t s :.1 IS R.J.Behar & Company, Inc. II�t�Tll Engineers. Planners RFQ No. 14 -07 -02 1 Page 1 2.41 J CLIENT City of Pompano Beach 1201 N. E. 5" Avenue Pompano Beach, FL 33060 Mr. Clayton Young Project Manager Tel (954) 786 -4029 Email: Clavion.}oung@copbll.com RJ BEHAR'S ROLE Project management, utility coordin- ation, CADD support, sidewalk repair plans, drainage design (if required) and permitting PROJECT STARTED: 0710112009 PROJECT COMPLETED: Ongoing COST /FEES PAID: 5101,760.00 CONST.COST: Unknown PROJECT LENGTH FOR INDIAN MOUND PARK: 0.45 acres PROJECT LENGTH FOR HILLSBORO INLET PARK: 1.37 acres RJ BEHAR•S KEY PERSONNEL Robert J Behar, PE Principal in Charge Javier Rodriguez, PE Project Manager Kelly Nowell, PE, LEED AP Project Engineer Rohan Punit, EI Project Engineer Jose Martinez, PE Structural Engineer RJ Behar has been contracted by the City of Pompano Beach to provide engineering design services. The scope of this project will include repairing the existing seawalls and site redevelopment at Hillsboro Inlet Park (Hillsborough Inlet & Intracoastal Waterway) and Indian Mound Park (S.E. 13" Street & Spanish River) b}, replacing some existing concrete piles, caps and sealing cracks along the seawall. A study was performed to obtain information on the existing subsurface conditions to assist in the design of the construction plans for the Indian Mound Seawall 92 repairs and Hillsboro Inlet Park in Pompano Beach, Florida. RJ Behar's responsibilities include project management, structural engineering, utility, coordination, CAD support, sidewalk repair, drainage design (if required) and permitting. Additionally, RJ Behar will provide coordination with survey and geotechnical as needed. CI`FT OF P0MPANO BEACH SEAWALL REPAIRS INDIAN MOUND PARK GIVY OF PODI PA;RO SSACH SEAWALL REPAIRS HILLSBORO INLET PARK .IL• •��� 0711 jt � -.o'pi P i R.J.Behar & Company, Inc. II' Engineers. Planner s RFQ No. 14 -07 -02 1 Page 12.42 I u J CLIENT City of Pembroke Pines Public Services Department 13975 Pembroke Road Pembroke Pines, FL 33017 Mr. George Wrves Tel: (954)435 -6582 Email: gwrves@ppines.com RJ BEHAR'S ROLE Construction Engineering Inspection Services PROJECT STARTED: 121112009 PROJECT COMPLETED: 0512010 COST /FEES PAID: 556,000 CONST. C OST: S577,644.00 RJ BEHAR'S KEY PERSONNEL Robert J Behar, PE Principal in Charge David G. Romano, PE Project Manager/ Senior Project Engineer Rafael Urdaneta, CCM, El Project Administrator Stacy Sookdew -Sing Resident Compliance Specialist (RCS) Mauricio Pinzon Roadway Inspector John Miller Roadway Inspector RJ Behar is providing full construction engineering inspection services for sidewalk improvements on the following projects within the City of Pembroke Pines. 1. N. W. 190 Avenue — Between Taft Street and Sheridan Street The scope of this project includes the addition of approximately 2,000 If. of six foot sidewalk, this is adjacent to the west right -of -way on NW 196" Avenue. Grading of the adjacent swale area and sod restoration with Argentina Bahia Sod is also included. 2. Pembroke Road —Between S.W. 120 Avenue to S.W. 1456 Avenue This project includes the addition of approximately 5,300 Itf of six foot and five foot sidewalks, this is adjacent to the north right -of -way of Pembroke Road. New ADA ramps with detectable warning surfaces will be installed. Thickened edge sidewalks with pedestrian handrails are to be installed where drop off conditions warrant, i.e. where existing drainage inlets align south of the proposed sidewalk. Drainage improvements, new curb installation, guardrail removal, grading of adjacent swales and sod restoration are also proposed. 3. Pembroke Road — Between S. W. 166•x-" Avenue and Silver Shores Boulevard The project scope includes the addition of approximately 15,3001f. of six foot sidewalk, this is adjacent to the north right -of -way on Pembroke Road. Thickened edge sidewalks with pedestrian handrails, new ADA ramps with detectable warning surfaces, grading of adjacent swales and sod restoration are also planned. R.J.Behar & Company, Inc. I!_�TTiI Engineers. Planners RFQ No. 14 -07 -02 1 Page 12.43 J. E CLIENT Florida Department District 4 Broward Operations ice 3400 West Commercial Boulevard Fort Lauderdale, FL 33309 Ms. Sierra Evans LAP /JPA Project Administrator Tel: (954)940 -7583 Fax (954)958 -7660 sierra.evans@dot.state.fl.us RJ BEHAR'S ROLE Oversight Construction Engineering Inspection Services PROJECT STARTED: 11812010 PROJECT COMPLETED: 0712013 CEI CosT /FEES PAID: 8298,199 FDOT CONTRACT No.: C8W75 EVALUATION GRADE: 3.0 RJ BEHAR'S KEY PERSONNEL Robert J. Behar, PE Principal in Charge David Romano, PE Project Manager/ Senior Project Engineer Rafael Urdaneta, CCM Project Administrator Stacy Sookdew -Sing Resident Compliance Specialist (RCS) John Hunt Senior Roadway Inspector John Miller Roadway Inspector C4 RJ Behar is providing the Florida Department of Transportation (FDOT) with Oversight Construction Engineering and Inspection (OCEI) services to assist the Department with several Local Agencies throughout Broward County, that have received Federal -ARRA Funds for their Local Agency Program (LAP). As oversight to FDOT, RJ Behar (OCEI) personnel ensures that the Local Agency is in full compliance with construction contract documents, project administration, ARRA Federal Requirements, and FHWA 1273 regulations including Equal Employment Opportunity (EEO), Affirmative Action (AA), Disadvantage Business Enterprises (DBE), and On- The -Job (OJT) Training. Our oversight inspection team is responsible for monitoring that the work is performed in accordance with plans and specifications oversee the sampling and testing of component materials, attend conference meetings with the District, and maintain accurate records and documentation of all project - related activities. List of Broward Oversight Projects: City of Wilton Manors - NE 15`h Avenue Streeiscape City of Lighthouse Point - NE 44`h Street Sidewalks City of Deerfield Beach - Goolsby BlvdAVest Entrance to Tri -Rail SE Idh Streetfrom AIA to Ocean Way City of Hallandale Beach - West Hallandale Beach Blvd. Improvements City of Fort Lauderdale - NW Neighborhood Enhancements Project Sistrunk Boulevard Project SR 8171 University Drive Project .SR 842 1Broward Boulevard Project SR 870 1Commercial Boulevard Project Cirr of Miramar - Bicycle Lane Project City of Weston - Bonaventure Boulevard Project R.J.Behar & Company, Inc. II, Engineers• Planners RFQ No. 14 -07 -02 1 Page 12.44 t�, 1 E i CLIENT South Florida Water Management District Subconsultantto: Malcolm Pirnie, Inc. 8201 Peters Road, Suite 3400 Plantation, F133324 Mr. Randy Fouch, PE Tel: (954) 414 -8960 E -mail: rfouch@pirnie.com RJ BEHAR'S ROLE Consultant for post design services PROJECT STARTED: 06112010 PROJECT COMPLETED: Ongoing CosT /FEES PAID: $272,620 CONSTRUCTION COST: Varies RJ BEHAR'S KEY PERSONNEL Juan H Vazquez, PE, PH, BCEE Principal in Charge Jerry Piccolo, PE Structural Engineer As part of the District's existing infrastructure rehabilitation projects, RJ Behar is providing services during construction that include: • Attending preconstruction meetings, progress meetings and other meetings; • Reviewing shop drawings, samples, and other data for compliance with the contract documents; • Reviewing substitution requests, RFI's, Value Engineering requests, and requests for clarifications; • Issuing clarifications and interpretations of Contract Documents as required; • Preparing clarifications and revising documents as required; • Reviewing requests for proposals and change orders; • Providing quality assurance reviews of test data; • Providing site visits and project construction observation; • Making recommendations for approval or rejection; • Attending substantial completion inspections; • Attending final inspections; • Providing record drawings; and • Assisting with start up and commissioning of constructed facilities. Some of the projects include: • S -124 Structural Repairs and Automation • G -36, S -1313, S -135 Lock Hoist Replacement • S -61 Navigation Lock Refurbishment • S065, S -65A Navigation Lock Refurbishment • S -65D Navigation Lock Refurbishmem • S -44, G -57 Gate Operator Replacement • Fuel Tank Platforms (18 sites) • C-4 IA Bank Stabilization • S -193 Navigation Lock Refurbishment • S -129 Trash Rake Replacement • S -131 Trash Rake Replacement • S -133 Trash Rake Replacement • S -135 Trash Rake Replacement R.J.Behar & Company, Inc. E n g i n e e r s - P I a n n e r RFQ No. 14 -07 -02 1 Page 12.45 J` C D7 I ✓.ui i�li l� J Miami -Dade County Metropolitan Planning Organization (MPO) Subconsultantto: Kimley -Horn & Associates, Inc. 5200 NW 33" Avenue, Suite 109 Fort Lauderdale, FL 33309 Mr. Gregory Kyle, AICP Tel: (954) 739 -2233 gregwlena *im lev -horn. com RJ BEHAR'S ROLE: Traffic Evaluations PROJECT STARTED: 312812011 PROJECT COMPLETED: 6130111 Cosr /FEES PAID: 52,572.00 CONSTRUCTION COST: N/A CHANGE ORDERS: None TIME EXTENSIONS: None RJ BEHAR'S KEY PERSONNEL Robert J Behar, PE Principal in Charge Rafael De Arazoza, PE, PTOE Task Manager Alexander Socarras, El Project Engineer t 1 The purpose of this study was to conduct traffic counts for a traffic study. The scope included collecting turning movement counts covering 6:45 to 8 :45 am and 1:15 to 3:15 pm periods during a typical weekday. Bus counts were separated from vehicle counts. The following locations were counted: 1. NE 151" Street and West High School Driveway 2. NE 151 "' Street and Center High School Driveway 3. NE 151` Street and East High School Driveway 4. NE 151 "' Street and Elementary School Driveway 5. Bay Vista Boulevard and North Elementary School Driveway 6 Bay Vista Boulevard and South Elementary Driveway ngure i R.J.Behar & Company, Inc. 111 Engineers • Planner s RFQ No. 14 -07 -02 1 Page 12.46 EA 11 I:] J. CLIENT: Miami -Dade County Metropolitan Planning Organization (MPO) Subconsultantto: Kimley -Horn & Associates, Inc. 5200 NW 33d Avenue, Suite 109 Fort Lauderdale, FL 33309 Gregory Kyle, AICP Tel: (954) 739 -2233 Email: greg.kyle@kimley-horn.com RJ BEHAR'S ROLE: Traffic Evaluations PROJECT STARTED: 0112512012 PROJECT COMPLETED: 0713112012 COST /FEES PAID: 88,817.00 CONSTRUCTION COST: N/A CHANGE ORDERS: None TIME EXTENSIONS: None RJ BEHAR'S KEY PERSONNEL Robert J Behar, PE Principal in Charge Rafael De Arazoza, PE, PTOE Task Manager Dima Poe, El Project Engineer Mariana Urdaneta Data Collection This project consists of the Development of Truck Parking Facilities in Miami -Dade Countv. R.J. Behar & Companv. Inc is providing the services indicated below for the subject study. 1. Beacon Lakes Development of Regional Impact (BL DRI) Access Connections to Roadway Network and Future Traffic Volumes. 2. Drainage: Determine general retention/detention pond areas or exfiltration trench needs for a 5 acre, 10 acre, and 40 acre site. R.J.Behar & Company, Inc. f l ' E n g i n e e r s • P l a n n e r s RFQ No. 14 -07 -02 1 Page 12.47 (A J. II �J Florida Department of Transportation, District 6 1000 N. W. 111 Street Miami, FL 33171 Mr. Danny Iglesias, PE Project Manager Tel: (305) 470 -5289 Fax: (305) 470 -6715 donne. idesiosndot. scat e. fl. us RJ BEHAR'S ROLE: Milling, resurfacing, pedestrian curb, signing and pavement markings, traffic control plans, ADA and pedestrian upgrades, as well as bicycle lane consideration. ® PROJECT STARTED: 211012011 PROJECT COMPLETED: 0612014 Cost /FEES PAID: 8589,876 CONST. COST: 53,416,423.00 Est. PROJECT LENGTH: 1.91 Miles FPID #:419190- 1 -52 -01 & 419190- 1 -52 -01 RJ BEHAR'S KEY PERSONNEL Robert J. Behar, PE Principal in Charge Javier Rodriguez, PE Project Manager Andrea Virgin, PE, LEED AP Project Engineer Yulet Miguel, PE Project Engineer Rohan Punit, EI Project Engineer Nanette Akvaz Project Designer 11 The project corridor is composed of approximately 1. 96 miles of Urban - Section, 6 -lane divided principal arterial along SR -5 1Biscayne Boulevard between NE 111" Street and north of NE 151' Street. The corridor is located in the Cities of North Miami and North Miami Beach. The scope of services included milling and resurfacing, pedestrian curb ramps upgrading to comply with ADA requirements, signing and pavement markings, and bike lane designations, and traffic control plans. The project access management analysis resulted in the closure of several unnecessary driveways. Enhanced traffic signal signage was required due to a high rate of accidents at the corridor's one signalized intersection. Additionally, the Typical Section was modified to accommodate bicycle lanes without widening. R.I.Behar & Company, Inc. II�t�Tll Engineers • Planner s RFQ No. 14 -07 -02 1 Page 12.48 El J. CLIENT City of Pembroke Pines 10100 Pines Boulevard Pembroke Pines, FL 33026 Mr. Charles F Dodge City Manager Tel: (954) 431 -4884 Email: cdodge@ppines.com RJ BEHAR'S ROLE: Design, permitting, constr pavement design, environmental (including wetland impacts mitigation) drainage r earthwork1geotechnical reco dations, and utility coordination Subconsuliants: Metric Engineering, Inc. (Environmental/Wetland Mitigation) Vertical V- Southeast, Inc. (Geotechnical/Tesiing) Craven Thompson & Associates, Inc. (Surveying) Chen Moore and Associates (Utility Coordination) PROJECT STARTED: 612212012 PROJECT COMPLETED (DESIGN): 07/2013 CONST. PROJECT COMPLETED: Ongoing COST /FEES PAID: $756,505.00 CONST. COST: $5.3 Million PROJECT LENGTH: 2 miles (Approx) RJ BEHAR'S KEY PERSONNEL Robert J Behar, PE Principal in Charge Javier Rodriguez, PE Project Manager Andrea Virgin, PE, LEED AP Roadway Design Yulei Miguel, PE Project Engineer Marlin Scattolini, EI ® Roadway Design This is a Design /Build project for SW 196" Avenue (from Pembroke Road to Pines Boulevard) and Pembroke Road (from ArW 196'" Avenue to SW 184'" Avenue). The scope of this project consists of designing a 2 mile rural section collector and arterial. The project includes roadway design, complex drainage including the design of twin 72" culverts, permitting, wetland mitigation, extensive earthwork with the use of Geogrid to avoid extensive demucking, and utility coordination. RJ Behar will also provide support during construction. R.J.Behar & Company, Inc. I!_tf�Trl Engineers • P l a n n e r s RFQ No. 14 -07 -02 1 Page 12.49 J CLIENT: City of Miramar Public Works Department 13900 Pembroke Road, Miramar, FL 33015 Mr. Luis Lopez, Director Engineering Services Tel: (954) 602 -3316 Far: (954) 602 -3599 Email: lalopez@ci.miramar.fl.us RJ BEHAR'S ROLE: Master Planning /Civil /Site Design PROJECT STARTED: 1111411013 PROJECT COMPLETED: Design complete 512014 COST /FEES PAID: 521,160.88 CONST. COST: Unk. LIA RJ BEHAR'S KEY PERSONNEL Robert J Behar, PE Principal in Charge Juan H. V6zquez, PE, PH, BCEE Project Manager – Engineer Record Rohan Punit, El Project Engineer Sugeily Patxot Designer LJ Forzano Park is an active sports league facility. Is has several baseball fields, but is mostly used for football and soccer. The project goal is to convert the three baseball fields into football /soccer fields. This will require the following: ➢ Removal of clay in the infields and replacing it with sod, 9 Demolition of the baseball bleachers and dugouts, ➢ Provide new score boards, bleachers and press box, 9 Design new grading and drainage for the revised layout ➢ Review the location of the existing lighting for the new field layouts, i Re- stripping the fields for standard soccer field dimensions, and ➢ Revise and modify the irrigation system RJ Behar was in charge of the project management, master planning and civil design of the improvements. RJ Behar also provided construction quantities, coordinated sub consultant efforts for the remodeling of the existing concession/bathroom building, and selection of the new scoreboard. As part of the master plan effort the existing parking lot was analyzed to improve circulation and provide additional spaces. R.J.Behar 8. Company, Inc. Engineers. Pla nners RFQ No. 14 -07 -02 1 Page 12.50 -° d&I' ��� � f ®�If- 111►' tat �r ' �4• ".'fir. R.J.Behar 8. Company, Inc. Engineers. Pla nners RFQ No. 14 -07 -02 1 Page 12.50 CLIENT: City of Pompano Beach Engineering Division 1201 NE 5th Avenue Pompano Beach, FL 33060 Ms. Alessandro Delflco, PE City Engineer Tel: (954) 786 -4144 Fax: (954) 786 -4028 Email: Alessandra.Delfrco0copbR. com RJ BEHAR'S ROLE: Basis of Design Report (BODR), stormwater design, sanitary sewer design of the wastewater collection system and design ofproposed water improvements, utility coordination, permitting, and cost estimating PROJECT STARTED: 412112014 PROJECT COMPLETED: Ongoing CosT /FEES PAID: 866,179.00 CONST. COST: N/A CHANGE ORDERS: None TIME EXTENSIONS: None CONTRACT: Lump Sum RJ BEHAR'S KEY PERSONNEL Juan H. Vazquez, PE, PH, BCEE Principal in Charge/ Project Manager Elmer Cardenas, PE Project Engineer Hans Murzi, PE Project Engineer The Lyons Park Neighborhood is located west of South Cypress Road, north of McNab Road, east of South Flagler Avenue and south of Southwest 8" Street. The area is served by an existing stormwater collection system. The existing stormwater management system consists of four independent systems, which discharge to systems outside of the neighborhood. The ultimate outfalls are located to the south of West McNab Road and to the east of South Cypress Road. The project area suffers from flooding problems as documented in the City Stormwater Master Plan (SWMP). This project intends to improve the drainage systems within the project area. The sanitary sewer lines within the Lyons Park Neighborhood are located in the rear yard easements of the propenies/homes. One of the City's Comprehensive Plan policies is to identify the feasibility of implementing capital projects to relocate the sewer lines or to rehabilitate them in place. This project intends to study the relocation of the sewers to the street's right -of -way. No improvements are needed to the existing lift stations. The water system has been upgraded but the services used the older black polyethylene pipe. This project intends to replace the service lines, to meet the newer city standards 107 -1 and 107 -2, from the water mains to the water meters. The project will not include a reuse water irrigation system. The project has been divided into two phases. Phase I will include the preparation of a Basis of Design Report (BODR) and preliminary design of the improvements. Phase 2 will include the design of the improvements, bidding, and construction phase services. R.J.Behar 8r Company, Inc. II�tJTYI E n g i n e e r s • P l a n n e r s RFQ No. 14 -07 -02 1 Page 12.51 Continuing Contract for General ® Environmental Engineering Client City of Fort Lauderdale Project Date(s) June 2008 — Ongoing County Broward Description E Sciences was awarded a contract with the City of Fort Lauderdale (City) to provide on -going environmental engineering support during two separate consultant selection processes. The scope of the contract is broad and provided us with a wide range of opportunities to support the City. The following summarizes some of the projects that we completed for the City: Sistrunk Boulevard: E Sciences was hired by the City to conduct soil and groundwater testing along Sistrunk Boulevard from 1 -95 to Andrews Avenue. The project was conducted in order to support the CRA with implementing a streetscepe and enhancement project. E Sciences conducted soil and groundwater testing at 36 locations to evaluate potential impacts to construction that may arise due to known contaminated sites historically located along the corridor. Potential sites of concern included historical dry cleaners, gasoline stations, junk yards and an incinerator ash landfill. Prior to implementation, E Sciences worked with the Florida Department of Transportation (FDOT) to determine a scope of analytical services. E Sciences reconciled the proposed subsurface structure locations (drainage structures, light fixtures, etc.) identified on construction plan sheets with the existing corridor conditions and proximity to potentially contaminated areas. Due to the high number of utilities anticipated to be located in dose proximity to the drilling locations, E Sciences engaged a private utility location contractor to locate underground utilities using ground penetrating radar and electromagnetic radiation surveys, in addition to review of City plans and coordination with Sunshine One Call. A Maintenance of Traffic (MOT) plan was prepared and submitted to the City prior to field activities. In addition to an assessment report, E Sciences provided general notes and bidding specifications language outlining requirements for managing contaminated soils and groundwater to be incorporated into the bidding and contract documents for this project. During construction, we assisted the City in working with the contractor to minimize impacts to construction and keep the project moving. This 'stimulus' project meant that deadlines were critical and that the work needed to be expedited. We developed a scope of work, met with FOOT to negotiate the scope, conducted private utility location, developed a MOT plan, and initiated the sample collection within 13 days of the first phone call. Our draft report was provided to the Community Redevelopment Agency (CRA) within an additional 12 working days. This project was completed to the satisfaction of the CRA and FOOT and we delivered the project under budget by more than $12,000. Fire Station #49: This project was undergoing redevelopment with a new City fire station when petroleum contamination was discovered during construction. E Sciences mobilized to the site the same day as requested to further investigate the implications of this finding on construction and regulatory notification. Historical and regulatory records indicated historic Underground Storage Tanks (USTs) on the property. Consultation with regulatory agencies, collection of soil and groundwater samples and sound environmental judgment allowed this project to proceed with minimal time delay and costs to the project. E Sciences also conducted air monitoring for construction workers to evaluate potential health implications of exposure to the unknown products discovered and provide the City with such documentation. ® =SSciences —ZL� Rev 8/12/2014 Project City of Fort Lauderdale General Environmental Engineering (2 -0433) OVERVIEW - NGL RFQ No. 14 -07 -02 1 Page 12.52 i E Sciences �s- United States Department of Housing and Urban Development (HUD) Environmental Documentation and Area -wide Floodplain Management Eight -Step Decision - Making Process: To enhance the quality of fife in our neighborhoods, the Fort Lauderdale City Commission has established four Community Investment Programs: the Neighborhood Community Investment Program (NCIP), the Neighborhood Community Investment Grant Program (NCIGP), the Business Community Investment Program (BCIP), and the Business Community Investment Grant Program (BCIGP). The goal of these programs is to provide matching grant funds for the construction of community improvements in the City's right -0f -ways that beautify neighborhoods and enhance the quality of life for those who live, work, and visit the City of Fort Lauderdale. The majority of individual actions considered for these projects include the following: street name decorative posts, entryway monuments, entryway signs, concrete curbing, swales, sidewalks, median islands, decorative lighting, solar decorative lighting, landscape lighting, trees, landscaping, and irrigation. E Sciences has prepared numerous environmental documentation packages to support HUD funding for the City of Fort Lauderdale's neighborhood improvement projects. The majority of these involved the preparation of Environmental Checklists in compliance with HUD regulations. E Sciences also prepared an Area wide Floodplain Management Eight -Step Decision- Making Process for them to utilize when projects are located within a 100 -year floodplain as defined by the Federal Emergency Management Agency. Opinion of Post Closure Costs, Wingate Landfill: In response to a City audit, E Sciences was tasked to develop an opinion of post - remediation costs for this Superfund site. Historic and future operations with respect to maintenance and monitoring costs were compiled in several spreadsheets to provide future annual allocations until fiscal year 2032. E Sciences created the spreadsheets such that the costs forecasts may be updated annually. Wingate Landfill Burrowing Owl Relocation: This red, ' �f ��'R jyr' tSS`�'r ✓> hazardous waste superfund site that has undergone ;P.-, regulatory closure. A protective cap system was installed at this historical municipal landfill to eliminate potential exposure to contaminants and to prevent migration of contaminants in the landfill into the groundwater. A condition of the closure is conducting monitoring of the groundwater, surface water and fish tissues on a periodic basis for a period of 30 years. During a five year inspection, the Environmental Protection Agency (EPA) identified the presence of two burrowing owl burrows on top of the capped area of the landfill. The EPA directed the City to remove the burrows and evaluate the integrity of the landfill cap. E Sciences was engaged to evaluate the possible damage, and coordinate burrow removal with state and federal regulatory agencies. The burrows were scoped and video recorded in an effort to assess whether or not the owls had affected/damaged the geomembrane with inconclusive results. However, it was determined that there were no eggs or flightless young in the burrows. Following coordination with the EPA, and the Florida Fish and Wildlife Conservation Commission (FWC), starter burrows were created outside of the cep area to encourage relocation of the owls to this area. The burrows were excavated and it was found that the cap had not been affected by the owls. The burrows were removed and the owls relocated themselves in the area outside the cap. Fort Lauderdale Executive Airport Endangered Species Surveys, Permitting and Relocation: E Sciences has conducted multiple endangered species surveys and relocation for proposed construction projects at Fort Lauderdale Executive Airport. Endangered species encountered, permitted or relocated include burrowing owls and gopher tortoises. Rev 8/72/2014 Project City of Fort Lauderdale General Environmental Engineering (2 -0433) OVERVIEW - NGL RFQ No. 14 -07 -02 1 Page 12.53 Fort Lauderdale Executive Airport Proposed U.S. Customs and Border Protection Facility: E Sciences was engaged by the City to assist with understanding the outstanding environmental and regulatory issues at a tenant space at the Fort Lauderdale Executive Airport as part of the planning for a future U.S. Customs and Border Protection Facility. The property is currently occupied by another private tenant who historically operated two fueling facilities: one abandoned in place and one recently taken out of service. Our scope of services included interviewing the tenant and a site visit, review of the tenant's consultant assessment reports, and communications with Broward County's Environmental Protection and Growth Management Department ( EPGMD). This ongoing process is continuing as E Sciences provides periodic updates and advises the City in ways to reduce the potential for liability associated with these former fueling systems and reduce the potential for them to impact construction. Progresso Village Neighborhood: E Sciences conducted a Phase I Environmental Site Assessment (ESA) for the City's Neighborhood Services group in order to support application for federal funding for decorative entranceway signs. Hortt Elementary: E Sciences conducted a Phase I and Phase 11 ESA for the City to support their purchase of this school property intended for redevelopment as a neighborhood park. This property was initially developed by Mr. M.A. Hortt who was one of the early Fort Lauderdale settlers. The project was expedited to meet the constraints of contract timing. Twin Lakes: E Sciences conducted a Phase I ESA and asbestos survey to support the City's purchase and redevelopment of this residence as a park. Fort Lauderdale Executive Airport Fuel Spill Regulatory Assistance: Due to damage to an aircraft fuel tank during a low speed collision between two airplanes at Fort Lauderdale Executive Airport, a jet fuel discharge was reported to EPGMD. Immediately after the incident staff employed emergency procedures and property managed the spill. E Sciences was initially called in to conduct soil testing to determine if the soils in the area were impacted with jet fuel. When E Sciences reviewed the documentation, we determined that everything had been sufficiently managed and that the activities should not require soil assessment or a formal discharge report, which would trigger a requirement to conduct a Site Assessment. E Sciences provided documentation and communications with EPGMD in order to prevent the reported discharge from entering the bureaucratic process of future assessment and remediation requirements. Fort Lauderdale Low Level Bridges: E Sciences provided asbestos surveys in anticipation of demolition and reconstruction of three low level neighborhood bridges for the City: The Harborage, Marcetta River, and Carlotta River. These reports met the requirements for FDOT, as FDOT was providing funding for this project. Fire Station #46: E Sciences was contracted with the City to provide an indoor air quality survey to evaluate comfort- related issues posed by building occupants regarding indoor air quality. The scope of services included a walkthrough of the building; interviews with building occupants; observations of the air conditioning systems; measurements for temperature, relative humidity, carbon monoxide, and carbon dioxide in each building area; and moisture readings in areas where either visible indications of moisture impact were noted or that were reported by building occupants. Sailboat Bend Preserve: E Sciences was hired by the City to conduct a Phase I and II ESA of vacant property being designated for use as recreational space and installation of a 'tot lor. The property is adjacent to the City's public works and police department complex. No environmental concerns were identified. Parcel Located at 538 NW 9th Avenue: E Sciences was engaged by the City's CRA to conduct a Phase I ESA of this property, located across the street from the CRA building. This vacant lot was being procured by the CRA as part of an assemblage of parcels for future development opportunities along Sistrunk Boulevard. Fences Jt Rev 8/12/2014 Project City of Fort Lauderdale General Environmental Engineering (2 -0433) OVERVIEW - NGL RFQ No. 14 -07 -02 1 Page 12.5.4 RFQ No. 14 -07 -02 1 Page 12.55 City of Miami Beach Environmental Engineering Continuing Services Client City of Miami Beach Project Dates August 2011 –Ongoing County Miami -Dade Description E Sciences was awarded a contract with the City of Miami Beach to conduct environmental engineering services. To date, E Sciences has provided the City with the following services: Spill Prevention Control and Countermeasure (SPCC) Plans — E Sciences prepared SPCC Plans for 12 facilities throughout Miami Beach. These facilities included pump stations, fire stations, public works yard, Miami Beach Golf Club and the Convention Center. E Sciences' approach for performing the SPCC Plan(s) required under this contract followed the steps outlined in applicable federal regulations (40 CFR 112). We conducted the following activities to obtain the information required to complete the Tier I SPCC Plan: • Review available as -built drawings, surveys and plans related to the structures and drainage pathways • Conduct a site visit of each facility with a person knowledgeable of the facility's tank systems, coordinated through the City's Environmental Department • Interview the site manager or other personnel familiar with the tank systems and other oil storage ® systems • Review records of previous spills • Evaluate topography and surface water flow regimes • Evaluate areas of obvious discharge potential and spill sources • Identify environmentally sensitive areas and potential receptors if a spill were to occur • Document security measures to prevent unauthorized access to oil handling • Develop a list of emergency response personnel • Review the City's spill response measures • Review records of tank integrity and pressure tests • Review the City's personnel training records The above information was used to complete the Tier I SPCC Plan for each facility. The Plan was reviewed and certified by an E Sciences Professional Engineer. We also incorporated recommendations to assist the City with compliance with state regulations. Green Waste Facility — This site is an undeveloped, bermed area located on the east side of the Miami Beach Golf Club. The site was previously used by the City of Miami Beach for solid waste management and a portion of the area contained buried debris. In anticipation of constructing the wastewater reclamation facility, the City implemented a material screening plan to remove the buried solid waste and screen out the larger (greater than 24nches) pieces of solid waste for off -site disposal. The recovered screened material (RSM) was merged with a berm around the solid waste handling area to separate it from adjacent properties and the golf course. The larger pieces of debris removed consisted primadly of rock, concrete and wood debris. Miami -Dade Department of Environmental Resource Management (DERM) (currently Permitting, Environment and Regulatory Affairs – PERA) required the City to demonstrate that there was a minimum of two feet of clean fill or other engineering control in place covering areas of solid waste in or around the berm ® in order pursue regulatory closure for the site. ��scie ces Rev 8/122014 Project 7- 0002 -001 NGL RFQ No. 14 -07 -02 1 Page 12.55 E Sciences conducted environmental services to provide the City with guidance on whether it can be ® demonstrated that there was two feet of dean fill covering the bens. In order to complete the project in a time and cost effective manner, E Sciences developed a phased sampling approach by collecting all the necessary samples, but conducting laboratory analysis on an iterative basis. The limited initial sampling results revealed the presence of regulated contaminants above regulatory criteria, therefore additional analysis was not deemed necessary. The City is currently proposing to implement an engineering control (EC) to achieve conditional site closure along with the adjacent golf course property, protect human health and the environment. E Sciences is completing the engineering control design and coordinating review and approval with PERA. We are including options for re -using unwanted, dean fill materials or recycled materials from other places within the City as part of the engineering control system. The proposed engineering control will consist of the installation of an impermeable geosynthetic day liner (GCL) and fill/sod system over the RSM berm. Furthermore, E Sciences is facilitating guidance and recommendation for the installation of the GCL cover to the City and will provide site oversight during construction in order to verify the proper installation of the cover and handling of the contaminated soil. Upon completion of the cover installation, E Sciences will submit as -built drawings and cross- sections documenting the constructed condition of the berm to PERA. Additionally, E Sciences will prepare and submit an inspection, monitoring and maintenance plan for the EC. Sea Level Rise Evaluation — E Sciences is conducting a study of groundwater elevations, tidal fluctuations and rainfall over a period of seven months to help the City to evaluate the effects of sea level rise. To identify areas of potential short and long term flooding, we are creating GIS layers of surface water levels from high quality UDAR data, groundwater levels from wells, and other research conducted. The critical component of the effort is to identify areas with limited soil storage capacity, and areas where sea level rise is expected to reduce unsaturated soil storage capacity further. These data will be contoured to provide a spatial presentation of areas with higher vulnerability for impacts of sea level rise through groundwater. ® A letter report outlining our methodology, the results of the study in narrative, charts and graphics, and recommendations will be provided at the completion of the study. We will work with City staff to develop a plan for future 'armoring" and creating resiliency of the City's stormwater system and other infrastructure as requested. Street Tree Inventory — E Sciences conducted street tree inventories for the Normandy Shores and Normandy Isles neighborhoods. A total of 6,010 trees were inventories using sub -meter GPS and provided to the City in an ESRI ArcGIS shape file. The work included assessing each tree for its general condition and providing recommendations for maintenance. Greenspace Canopy Assessment — Using i -Tree Canopy and i -Tree Vue, E Sciences assessed the extent of the City's urban forest canopy and the ecological services provided by the trees. E Sciences estimated the canopy coverage for the City's entire urban forest, its parks and its rights of way using i -Tree Canopy. It also estimated the percentage of available space remaining within the City for additional tree planting. Using i -Tree Vue, calculations were made to estimate the carbon sequestration and storage, as well as pollutant removal being provided by the trees. E Sciences developed a brochure for public education documenting the information from the study. ® :52&�M' ces Rev 8/12J2014 Project 7 -0002 -001 NGL RFQ No- 14 -07 -02 1 Page 12.56 RFQ No. 14 -07 -02 1 Page 12.57 Overseas Highway Client HDR Engineering for the Florida Department of Transportation District Six Project Dates July 2012 — Ongoing County Monroe Description E Sciences, Incorporated (E Sciences), as a subconsultant to HDR Engineering, Inc., is providing assistance with the environmental, drainage and permitting services required on the Overseas Highway roadway improvements from north of Old SR-4A/MM 77.5 to Jerome Avenue /MM 81.41 located in Monroe County, Florida. E Sciences conducted the wetland and listed species survey for the project corridor. Mangroves, forested area and beach are located adjacent to the project corridor and portions of the corridor cross over or are adjacent to waters of the Florida Keys National Marine Sanctuary ( FKNMS). These waters are designated as an Outstanding Florida Water (OFW), and as such are afforded special projection. Numerous protected species utilize the FKNMS upland and offshore habitats in the project vicinity. Due to the nature of the project (i.e., milling and resurfacing; addition of bike lanes in uplands; restoration of existing bike paths; pavement markings), no direct wetland or listed species impacts are expected as a result of the project. However, special attention to the surface water pollution prevention plan (SWPPP) and erosion control plan (ECP) will be required to ensure impacts to the FKNMS are avoided. ® E Sciences is working with the project engineer to avoid wetland impacts. This includes providing specific items, such as dearly delineating areas which cannot be used for storage of equipment or materials; and instructions for preventing any materials from bridge work falling into the water to ensure inadvertent impacts do not occur. i ' __� p - -_� •. a e o _ •`..Cloi . CSeiences Rev811 212 0 1 4 FOOT D6 Overseas Highway (7 -0084 -001) RFQ No. 14 -07 -02 1 Page 12.57 E" I �a Vizcaya Southern Lagoon & Northern Canal Tidal Swamp Landscape Environmental Restoration Client Miami -Dade County, Vizcaya Museum and Gardens Trust Project Date(s) January 2012 – Ongoing Project County Miami -Dade Description Vizcaya Gardens and Museum, built in 1915 by Industrialist James Deering, was acquired in 1952 by Miami -Dade County and is a US Historic National Landmark site. Devastation from Hurricanes Wilma and Katrina in 2005 wreaked havoc on the gardens and grounds, designed for Deering by the Columbian Landscape Architect Diego Suarez, resulting in debris and sedimentation blockages in the canal and tidal pond system that connects to Biscayne Bay. Nuisance and exotic species infestations, and declining water quality from a loss of tidal flushing has resulted in a loss of fish and wading bird usage of the gardens and waterways. Rare coastal hammock hardwood forest habitat was also destroyed. E Sciences is formulated a multi- disciplinary landscape architecture and environmental restoration plan for the waterways and tidal pool which balances ecological function with creative landscape aesthetics, recreational functions and values, and improvements to water quality, and planting designs based on historic flora inventories — including mangroves, native hardwood hammock and coastal scrub species. E Sciences developed design plans to dredge the south canal at Vizcaya. A collapsed retaining wall at the mouth of the south canal, in addition to encroachment of mangroves and other emergent wetland vegetation, through the deposition of organic material and the capturing of sediments by their roots, has resulted in interruptions to the intended tidal fluctuations within the canal. E Sciences applied for a Class I Permit from Miami -Dade County Regulatory and Economic Resources (RER) Department), a permit exemption from the Florida Department of Environmental Protection (FDEP) and a Letter of Permission (LOP) from the U.S. Army Corp of Engineers (USACE) to conduct maintenance dredging activities involving the removal of approximately 1,410 cubic yards of silt and sediments from the bottom of the canal. The objective of this project is to enhance and restore lost hydrologic and biological functions to the canal. Rev 8/1212014 Project No. 7- 0091 -001 RFQ No. 14 -07 -02 1 Page 12.58 0 El E ■ Longitude Surveyors, LLC. Sub - Consultant Name: I B Longitude Surveyors, LLC. Principal in Charge: Eduardo M. Suarez — Project Surveyor Project Name & Location: West 63d Street Bridge, Miami Beach, FL Scope of Service: Performed a Bridge Survey of the topography of the bridge and the structural support beneath the bridge; Performed a Bathymetric Survey underneath both bridges and extending twenty feet on each side; Obtained spot elevations throughout survey corridor every fifty feet and at high low points at existing crown of road, at center line of right -of -way edges of pavement, existing driveways, front and back of sidewalks, swales and drainage inlet grates; Confirmed existing pipe invert elevations, pipe directions and apparent pipe diameters at all existing structures within survey limits. Project Fee: $15,000.00 Project Date: 04/2014- 07/2014 Prime Consultant: Milian, Swain & Associates, Inc.- Julio Menache, Dir. of Oper. Prime Consultant Contact Information: (305) 441 -0123 X 208, jmenache @milianswain.com Project Photograph: r_yS •.� .r., � r, , RFQ No. 14 -07 -02 1 Page 12.59 0 Longitude Surveyors, LLC. Sub - Consultant Name: Longitude Surveyors, LLC. Principal in Charge: Eduardo M. Suarez — Project Surveyor Project Name & Location: Corona Del Mar Force Main Extension Scope of Service: Performed a Topographic survey within the limits of the right -of -way; located all paved areas, right of way lines, sidewalks, handicap ramps, medians, signal mast arms, driveways, overhead lines, curb cuts, walls, valley gutters, bus benches, utility castings, curb and gutters, signs, poles (including guy wires), fences, and all other significant above ground features within the survey corridor; obtained existing spot elevations throughout the corridor to include elevations at 50 foot (max) intervals and at high low points at existing crown of road, at right -of -way lines, edges of pavement, gutter flow line, top of curb, front and back of sidewalks, swales, and drainage inlet grates; confirmed existing pipe invert elevations, pipe direction and apparent pipe diameters at all existing drainage and sewer structures within the survey limits; and located Septic Tanks. Project Fee: $17,100.00 Project Date: 02/2014- 05/2014 Prime Consultant: Chen -Moore & Associates Jose L. Acosta, RE Prime Consultant Contact Information: 786 -497 -1500 Ext.1077 jar-osta@chenmoore.com Project Photograph: RFQ No. 14 -07 -02 1 Page 12.60 2 2 r rs. LLC. Sub - Consultant Name: M Longitude Surveyors, LLC. Principal in Charge: Eduardo M. Suarez — Project Surveyor Project Name & Location: Gilbert Samson Oceanfront Park, Sunny Isles, Florida Scope of Service: Longitude performed and prepared a Boundary and Topographic Survey; established the City of Miami Beach Bulkhead Line and the Erosion Control Line; established vertical and horizontal control for future construction; showed all improvements, located all utilities; provided tree survey; and Cross sections, (spot elevations) in 50- foot grids. Project Fee: $3,600.00 Project Date: 05/2014 - 05/2014 Prime Consultant: RJ Behar & Company, Inc Javier Rodriguez, P.E Prime Consultant Contact Information: 954- 680 -7771 J.rodriguez@rjbehar.com Project Photograph: — :Qua °�; — �•r ,— +�� --'ice► a. A. RFQ No. 14 -07 -02 1 Page 12.61 E C`J 11 RFQ No. 14 -07 -02 1 Page 12.62 Longitude Surveyors, LLC. Sub- Consultant Name: I Longitude Surveyors, LLC. Principal in Charge: Eduardo M. Suarez — Project Surveyor Project Name & Location: Nikki Beach, Miami Beach, Florida Scope of Service: Longitude Surveyors, LLC. prepared a Boundary and Topographic Survey including the following: established vertical and horizontal control for future construction; showed all improvements from Right -of -Way to Right -of -Way; located all utilities, provided tree information; and located cross sections, (spot elevations). Project Fee: $6,000.00 Project Date: 12/2012 —01/2014 Prime Consultant: Milian, Swain & Associates, Inc. Julio Menache, Director of Operations Prime Consultant Contact Information: 305 - 441 -0123 Ext. 208 jmenache @milianswain.com Project Photograph: r, pie RFQ No. 14 -07 -02 1 Page 12.62 11J 5�� Information /r�� .ToBuild0n Ens+mer+ne • ins • Te.sng REPRESENTATIVE PROJECTS Bernstein Park — Proposed Soccer Field, Stock Island, Key West, Florida. The project included the construction of a soccer field and associated stormwater management systems at the Bernstein Park. The conversion to soccer field involved re- grading an approximate 112,000 square foot area of the site by elevating its current site grades by one foot. Role: Geotechnical Engineering Services Dates: April 2011 to September 2012 Client: Ms. Ann M. Riger, Monroe County Engineering/Project Development/Wastewater Proposed N.W. 114th Avenue Park, Dora], Florida. The overall project as we understand will consist of the following new components: Playfields consisting of soccer fields, a baseball field, tennis courts, and basketball courts. A two -story recreational center and a pedestrian bridge across N.W. 114th Avenue that will connect the recreational center to the playfields situated east of N.W. 114th Avenue. Miscellaneous structures consisting of restroom facilities, storage areas, band shell and shelter structures at various locations within the property. Paved parking/drive areas within the northern perimeter of the property and drainage systems consisting of exfiltration trenches and retention ponds. Role: Geotechnical Engineering Services Dates: June 2014 to on -going Client: Mr. Jorge Gomez, P.E., Chief of Engineering, City of Doral ® Danny Meehan Park Improvements, Medley, Florida. The project will involve the construction of a bathroom facility, new paved parking area, dry retention area, basketball court and soccer field as part of the park improvements. In addition, the improvements will include a stormwater management system(s). Role: Geotechnical Engineering Services Dates: June 2014 to on -going Client: Mr. John Wilt, P.E., Senior Engineer III, ATKINS C Cleveland Clinic Neurology Institute and Cancer Center, Weston, Florida. The first phase in a larger development plan, the Cleveland Clinic Neurology Institute and Cancer Center project is a 155,900 square foot outpatient clinic facility that includes a cancer center with linear accelerators, a neurology center, and conference areas. The project also includes sitework that consists of removing a parking lot from the footprint of the building and the improvement of two parking lots to serve the Center. PSI is providing subsurface exploration and geotechnical engineering directly to Cleveland Clinic. Role: Geotechnical Engineering Services Dates: December 2012 to on -going Client: Mr. Michael Chesser, P.E., Cleveland Clinic RFQ No. 14 -07 -02 1 Page 12.63 M. Information L/'"�..To Build On EnO—Or ns . consum"g . re,a g Dorothy M. Wallace Cope Center, Miami, Florida. The project will involve the construction of a canopy structure over the existing walkway present along the south facade of the school buildings. In addition, new construction will include stormwater management system(s). Role: Geotechnical Engineering Services Dates: April 2014 to on -going Client: Mr. Marcel Douge, Project Manager, Miami -Dade County Public Schools (MDCPS) Colonial Drive Elementary School, Miami, Florida. The project will involve the construction of a new canopy structure and covered walkway. In addition, new construction will include stormwater management system(s). Role: Geotechnical Engineering Services Dates: April 2014 to on -going Client: Mr. Marcel Douge, Project Manager, Miami -Dade County Public Schools (MDCPS) Howard Drive Elementary School, Miami, Florida. The project will involve addition/expansions to six pairs of restrooms within the school property. The expansion will be one -story, similar to the existing restroom. In addition the development will include stormwater management system(s). Role: Geotechnical Engineering Services Dates: April 2014 to on -going Client: Mr. Marcel Dougd, Project Manager, Miami -Dade County Public Schools (MDCPS) ® City of Doral Police Facility/Public Works Addition, Doral, Florida. The project will involve structural additions to the existing Police Department and Public Works Building. The building additions will be one -story, similar to the existing construction and approximately ±6,500 square feet (SF) in area. The additions are planned west of the existing construction. Role: Geotechnical Engineering Services Dates: March 2014 to on -going Client: Mr. Rudy de la Torre, Chief of Construction, City of Dora] Proposed Playgrounds at Various Miami -Dade Schools, Miami, Florida. The project will consist of the construction of new playgrounds within four separate elementary schools (Avocado Elementary School, Bowman Ashe /Doolin K -8 Center, Howard Drive Elementary School, Whispering Pines Elementary School) located in Miami -Dade County, Florida. The new playground will include a canopy /shade structure, concrete side walk and playground equipment. Role: Geotechnical Engineering Services Dates: July 2014 to on -going Client: Ms. Lourdes Rodriguez, AIA, Rodriguez Architects, Inc. 11 RFQ No. 14 -07 -02 1 Page 12.64 �M Information L/""F� .To Build On ••Tesdm ® Florida Power & Light Proposed Overtown- Venetian Transmission Line, Miami, Florida. Florida Power & Light (FPL) was faced with the critical challenge of installing a 138 kV line from its substation in Miami across Biscayne Bay to its Venetian substation in Miami Beach. This needed to be accomplished while minimizing impacts to the community and environment and keeping the public informed of the design logic and construction process. Electric power load demand in the Miami and Miami Beach area was projected to exceed the current capacity by the middle of 2007. The increased load was a result of new commercial office buildings and other facilities in the area. The load demand growth will cause the transmission network serving the Miami Beach areas to exceed the existing capacity supplied by FPL through the existing power circuits to that area. Unacceptable reliability conditions may occur if the new transmission line is not constructed to improve the existing systems capacity. The purpose of the geotechnical exploration program is to provide exploratory information in connection with the proposed FPL Overtown- Venetian Transmission line project. The proposed method of installation of the transmission line is primarily by horizontal direction drilling (FIDD) to minimize impacts to the submerged aquatic resources in Biscayne Bay. Cut and cover methods are being evaluated for the landside portions (Miami Beach) of the project. The purpose of the geotechnical exploratory program is to obtain subsurface soils information needed to complete the transmission line design and to determine the most appropriate depth for the transmission line installation. PST's services included obtaining data regarding the general subsurface conditions along the ® proposed alignments by means of exploratory borings (SPT and rock core), as well as laboratory testing of the collected samples. The laboratory testing was conducted for classification purposes and to provide pertinent engineering characteristics of the material. Role: Geotechnical Engineering Services Dates: June 2007 to on -going Client: Mr. Jim Sells, Jacobs RFQ No. 14 -07 -02 1 Page 12.65 Information L/" EN To Build On Engt • ro=LdaV • T�ffng 0 Port of Miami Tunnel Project - Miami -Dade County, Florida PSI provided geotechnical engineering services for the Port of Miami Tunnel project in Miami - Dade County, Florida. The Florida Department of Transportation (FDOT) District 6 completed a PD &E study of a four -lane tunnel connection from Watson Island to the Port of Miami that will provide direct access between the Port of Miami and 1 -395 via MacArthur Causeway. This PD &E study was reviewed by the Federal Highway Administration (FHWA) and they determined that construction of this bored tunnel connection would not have any significant impact on the human environment. Thus, on December 13, 2000, FHWA issued a Finding of No Significant Impact for the project. Following the issuance of the EA/FONSI by FHWA, this project was transferred to the jurisdiction of Florida's Turnpike Enterprise. In 2005, the project was transferred from the Florida's Turnpike Enterprise back into the jurisdiction of FDOT District 6. Since the completion of the PD &E Study and receipt of the FONSI, many changes have occurred, specifically with new development on Watson Island. Before proceeding with further work based upon the approved FONSI documents, the Turnpike Enterprise decided that it was prudent to re- evaluate the previous PD &E Study. The Turnpike Enterprise has therefore, selected Parsons Brinckerhoff Quade & Douglas, Inc., as their Owner's Representative, for the re- evaluation of the PD &E study for the Port of Miami tunnel. The general objective is to develop a cost effective program to link the Port of Miami with the ® Interstate system, thereby improving the passenger and cargo movement to and from the Port, alleviating the traffic congestion and pollution in the Miami Central Business District (CBD), and allowing the growth of the Port with positive socioeconomic impacts on the region. The project consists of a depressed roadway and tunnel between Watson Island and Dodge Island beneath the Government Cut main channel in Biscayne Bay, to provide improved access for cargo and passenger vehicles destined for the Port of Miami. The project is designed to divert trucks and busses carrying cruise passengers directly off I -395 (MacArthur Causeway) through this dedicated roadway directly into the Port. The plan takes heavy traffic off the streets of Miami, thereby eliminating a source of congestion. Currently, the project calls for two lanes inbound and two lanes outbound. The bored tunneling option has been considered below the Main Channel. Cut and cover methods are being evaluated for the landside portions of the project. PSI's services included a geotechnical study to obtain data regarding the general subsurface conditions near the proposed alignments by means of exploratory borings, as well as laboratory testing of the collected soil and rock samples. The laboratory testing was conducted for classification purposes and to provide pertinent engineering characteristics for this study. Role: Geotechnical Engineering Services Dates: August 2003 to on -going Client: Mr. Eldon Abott, PE, Parson Brinckerhoff Quade & Douglas, Inc. 11 RFQ No. 14 -07 -02 1 Page 12.66 0T C O L LL m C ro C J C m C L C C VU N t G7 Y_ t l 2 a C J 7 v L L Q N U V Q) N Ln O n fp O N z � z o C, 0- LL m� c '9 c Q Y Z c U U U W :d . L d m 7 d C2 C 1 m a S m W W V m a x r o- m N d Q N m � L m N C m M r y ? L m m a L , y Sz m m � x � C d m m E m � v Y gym+ L J ` d v m •m m d � m d S i - S L [] v m m Ly � m m m m d' L � CE L d m U J O U C Z � W W U C Z � W V C7 W J z Vi W N U � Z C Z Y �d U_ U � A'7 a 0 W fn m LL � o CL m m N O n O O Z JAVIER RODRIGUEZ, PE EDUCATION B. S. Civil Engineering, Florida International University, 1987 YEARS OF EXPERIENCE YEARS WITH RJ BEHAR 27 Years 2004 - Present PROFESSIONAL REGISTRATIONS P. E. Florida License No. 48264/1994 ENGINEERING EXPERIENCE Mr. Rodriguez has extensive experience in urban and rural roadway design including geometry, drainage, quantity computation and construction cost estimating. His expertise includes project scheduling and administration. He has served as design engineer, drainage engineer and permit coordinator as well as project manager. At RJ Behar, Mr. Rodriguez is the Director of Civil Engineering and oversees all aspects of design and construction document preparation. He has more than 25 years of experience. RELEVANT EXPERIENCE Town of Davie In -House Staff Support — Town of Davie, Florida Project Manager — This assignment involves serving as the Town of Davie Engineering Department Staff. Duties include reviews and comments for development projects Development Review Committee (DRC), attending DRC meetings, providing review of construction permit applications, providing site inspections and assisting the Town Engineer on technical matters. Additionally, Mr. Rodriguez serves as acting Town Engineer during the Town Engineer's vacations and /or absences. Town Engineer — Town of Southwest Ranches, Florida As Town Engineer, his responsibilities included review of all building permits, fill permits, developing cost estimates for the Town's capital improvement budget and representing the Town on all engineering matters. Equestrian Park Improvements — Town of Southwest Ranches, Florida Project Manager — He developed the construction documents for improvements to the Town's Equestrian Park. 1-75/Griffin Road Interchange Study — Town of Southwest Ranches, Florida Engineer — He developed the geometric concepts for the 1 -75 /Griffin Road interchange. Horse Trails — Town of Southwest Ranches, Florida Project Manager — He developed the master plan and construction drawings for the Town's Horse Trails. Miracle Mile Median and Signal Improvements — City of Coral Gables, Florida Project Manager — The scope included the design and coordination of converting Miracle Mile from a 6 -lane undivided to a 4-lane divided section. The project included exclusive left turn lanes, sidewalk improvements and replacement of all signals. Welleby Park Expansion — City of Sunrise, Florida Project Manager in charge of the coordination with the City of Sunrise for the location and design of the concrete pads for the'LifeTrail' ADA accessible wellnesslexercise stations. SR -7 /Sunrise Boulevard Construction Inspection — City of Lauderhill, Florida Project Manager — The scope included the Construction Engineering Inspection Services for this intersection improvement project in the City of Lauderhill. This project involved the widening and reconstruction of this major urban arterial intersection and was accomplished through an agreement between the FOOT and the City. It included extensive utility coordination, resulting from the widening of SR -7. The project was under FDOT oversight as SR -7 is a state road. The project also involved drainage improvements, signalization and lighting. The project required a complex Maintenance of Traffic plan including periodic lane closures. Sistrunk Boulevard (from Federal Highway to 270, Avenue) — City of Fort Lauderdale, Florida Project Manager — The scope of this project involved streetscape, traffic calming and extensive public involvement, and water line replacement for the City of Fort Lauderdale C.R.A. NW 7019th Avenue Connector, Project Development and Environment (PDBE) Study — City of Fort Lauderdale, Florida 11 R.J.Behar RFQ No. 14-07-021 Page 13.2 JAVIER RODRIGUEZ, PE Assistant Project Manager — The scope of this project involved environmental documents, alignment alternatives analysis, corridor analysis and a right -of -way relocation plan. Wolk Park Lake Improvements — City of Lauderhill, Florida Project Manager — The scope of this project consisted of lighting improvements for the park's fitness trail and construction inspections of same. Westwind Park Improvements — City of Lauderhill, Florida Project Manager — The scope of this project consisted of lighting improvements for the park's fitness trail and design of exercise equipment pads along the trail as well as construction inspections of same. Multi -Use Trail — City of Plantation, Florida Project Manager /Engineer of Record — The scope was for approximately 2 miles of a pedestrian/bicycle facility including trail heads and rest stops. C -11 Multi- Purpose Bridge Design/Build Criteria — Town of Southwest Ranches, Florida Project Manager — He was responsible for the preparation of certification documentation for the Town of Southwest Ranches. His responsibilities included obtaining required documentation, coordinating meetings with federal agencies and preparing the application package for submittal. This Local Agency Program allowed the Town of Southwest Ranches to obtain federal funding for the two bridge projects. The scope of work included the development of the project cost estimates, design build criteria, as well as coordination with subconsultants. Further activities included performing all necessary engineering calculations and designs associated with the C-11 canal hydraulics. Site visits were performed as necessary as well as coordination with local and federal governmental entities was maintained in order to ensure that site requirements were met and permits obtained as they pertain to the project. NW 71^/91h Avenue Connector (Design) — City of Fort Lauderdale, Florida Project Manager — The project includes the roadway design of a 1.5 mile urban section, 4 -lane divided, connector between NW 7" and NW 9th Avenues in Downtown Fort Lauderdale. The scope of this project includes signalization, drainage design, signing and pavement marking, permitting as well as public involvement coordination. NW 441h Street Improvements — City of Sunrise, Florida Project Manager /Engineer of Record — Project activities included the development of a typical section analysis to determine ® the most feasible alternative as well as the development of construction documents and permitting. A drainage analysis was also performed for the design of the outfall structure that connects to a local canal. The scope of this project consisted of the enhancement of an existing swale conveyance system as well as improvements to the existing streetscape with the addition of a sidewalk feature along the project limits. Project length: 1.90 miles City Engineer — Cfty of Lauderdale Lakes, Florida City Engineer — The project consisted of providing professional civil engineering consultation to the City of Lauderdale Lakes Engineering and Construction Management Services Division regarding plan development reviews, associated engineering activities and weekly inspection services. Bus Shelter Design -Build Criteria Package — City of Lauderdale Lakes, Florida Engineer — He developed a Design -Build criteria package for the construction of six bus shelters along SR -7 (US-441) in the City of Lauderdale Lakes. This assignment included establishing the design criteria for the shelters, utility coordination, coordination with FDOT, coordination with Broward County Transit and determination of available right -0f -way. West Avenue Basis of Design Report (BODR) — City of Miami Beach, Florida Chief Civil Engineer in a multidisciplined team who developed the conceptual design for the improvement and beautification of an urbanized neighborhood in Miami Beach. The improvements included the development of a stormwater management concept that incorporated the use of injection wells and pumps. It also induded water main replacements. Sunrise Lakes Boulevard Improvements — City of Sunrise, Florida Engineer of Record — The scope included the improvement of 2.3 miles of an urban collector. The improvements included the addition of 'Valley Gutter on the outside edges of pavement and the reconstruction of the median. It also included milling and resurfacing the entire 2.3 miles, installation of new pavement markings and signage and aesthetic treatments at three intersections. Battersea and Douglas Drainage Improvement — City of Miami, Florida Drainage Engineer for the drainage improvements for a residential street intersection. This project involved producing an alternative analysis, construction plans and permitting to relieve flooding at this intersection. It also included permitting for the improvements. The selected alternative included the use of injection wells and upgrading of existing storm sewer system and outfall. Town of Southwest Ranches, Local Agency Program (LAP) Certification — Town of Southwest Ranches, Florida q, I R.J.Behar I RFQ No. 14-07-021 Page 13.3 JAVIER RODRIGUEZ, PE As Town Engineer for this municipality, he prepared the application package for FDOT review and approval to qualify the town to receive LAP funds for capital projects. He served as qualifier for the Town, as the program requires a Florida Licensed Professional Engineer. Stirling Road Loop Grant Assistance — Town of Southwest Ranches, Florida Project Manager — RJ Behar assisted the Town of Southwest Ranches to obtain funding for the construction of the Sliding Road Loop Multipurpose Trail. Services included cost estimates, conceptual plans and technical support during the coordination phase. Town of Davie, Local Agency Program (LAP) Certification — Town of Davie, Florida Project Manager — He prepared the application for the Town to receive certification to receive funds from FDOT for capital projects. SE 151h Street, South Miami Road, SE 10"' Avenue Intersection Improvements — City of Fort Lauderdale, Florida Project Manager — He provided the engineering design services for the intersection improvements of SE 15" Street with Miami Road and SE 10�1 Avenue in Fort Lauderdale. Seven Isles Entry Beautification — City of Fort Lauderdale, Florida Project Manager — The project consisted of improvements to the Seven Isles Entryway. These improvements included adding a parking space on the west side of SE 23rd Avenue as well as beautifying two of the existing bridges. Old Davie School Improvements — Town of Davie, Florida Project Manager — The scope of this project consists of drainage, parking and utility improvements for an historical school (now converted to a museum) and adjacent park property. DesignBuild - SW 1961^ AvenuelPembroke Road — City of Pembroke Pines, FL Project Manager Engineering — The scope of this project consists of designing a 2 mile rural section collector and arterial. The project includes complex drainage, permitting, wetland mitigation, extensive earthwork with the use of Geogrid to avoid extensive demucking. The project also includes sidewalks and twin culverts. RJ Behar will also provide support during construction. Project Length: Approximately 2 miles SR- SIUS- 110verseas Highway from Fontaine Drive to S. of Tavernier Creek Bridge, Monroe County, Florida — FDOT, District 6 ® Project Manager — The scope of services includes milling and resurfacing, Signing and Pavement Markings, Traffic Control Plans and ADA and pedestrian features upgrades. The project access management analysis resulted in the closure of several unnecessary driveways. Enhanced traffic signal signage was required due to a high rate of accidents at the comdor's one signalized intersection. Additionally the Typical Section was modified to accommodate bicycle lanes without widening. Project length: 0.80 miles. SR -71LIS -441 Roadway Lighting and NW 111" Place Pedestrian Lighting Improvements, City of Lauderhill, Florida — FDOT, District 4 LAP Project Project Manager — Responsible for the design, quality assurance reviews of the plans, permitting and coordination with respective agencies. The scope of this project includes milling and resurfacing, installation of decorative stamped concrete and asphalt, lighting, landscaping, and street furniture. This is a FDOT Local Agency Program (LAP) Project. Project length: 0.45 miles NW 87n' Avenue (SR-973/Galloway Road) Traffic Study, Miami -Dade County, Florida — FDOT, District 6 (FM No. 405615.3.52 -01) Engineer of Record — The scope included a traffic study with traffic counts to determine the optimal geometrics, traffic operations, and signal warrants for 8 intersections. The scope of this project consisted of final design and future new reconstruction, roadway design, traffic operations, drainage, structure and construction of NW 87"' Avenue (from NW 741, Street to NW 1031d Street) within the Town of Medley. Project length: 1.90 miles t. Devine Park — Town of Davie, Florida Project Engineer — The Town of Davie contracted RJ Behar to convert a portion of the Devine Estates Tree Nursery into an equestrian park. Site elements include multi -use pedestrian/equestrian trails, a gazebo overlooking the existing pond, design of a drainfield for the proposed bathrooms, horse trailer parking and staging area for patrons with enclosure of the remaining tree nursery with associated maintenance access. Permitting entities include the Town of Davie, Central Broward Water Control District and Broward County Health Department. C JIM RFO No. 14-07-021 Page 13.4 JAVIER RODRIGUEZ, PE Hialeah Public Works Site Plan — City of Hialeah, Florida ® Engineer of Record — He was responsible for the site remodeling, demolition and reconstruction phasing of the City of Hialeah Water and Sewer Department Complex. The project included extensive utility coordination to coincide with the construction phasing for the project, new site layout, new exfiltration trench drainage system and design of new water and sewer facilities to service site. SR- 7/Sunrise Boulevard Lighting Design — City of Lauderhill, Florida Project Manager for the lighting plans preparation — This project consisted of roadway lighting design for SR -7 (US-441) at Sunrise Boulevard in the City of Lauderhill. The design was completed in accordance with FDOT roadway lighting criteria. Due to numerous existing utilities, the light pole foundations included the design of spread - footings as well as extensive coordination with utilities owners. The project also involved procuring a permit from FOOT. Sunrise Athletic Complex, Additional Parking — City of Sunrise, Florida Project Manager /Engineer of Record — He was in charge of providing engineering design services for the addition of parking spaces at the Sunrise Athletic Complex within the City of Sunrise. BC & FAU A. Hugh Adams Parking Garage — Davie, Florida Design Engineer — The scope of this project consisted of civil engineering services for the design -build team for a five story 1,000 vehicle parking garage located in the Broward College Davie campus. Town Engineer - Inspection Services — Town of Southwest Ranches, Florida Project Manager — The scopes of services included inspection services, reviews of all building permits, fill permits, develop cost estimates and prepared construction documents. SR- 71Sunrise Boulevard Construction Inspection — City of Lauderhill, Florida Project Manager — The scope was for the Construction Engineering Inspection Services for this intersection improvement project in the City of Lauderhill. This project involved the widening and reconstruction of this major urban arterial intersection and was accomplished through an agreement between the FDOT and the City. It included extensive utility coordination, resulting from the widening of SR -7. The project was under FDOT oversight as SR -7 is a state road. The project also involved drainage improvements, signalization and lighting. The project required a complex Maintenance of Traffic plan including periodic lane closures. ® Construction Management Oversight — City of Lauderdale Lakes, Florida Project Manager for the construction of 'The Island', a veteran's memorial park located at the intersection of SR -7 and SW 36"137" Street. RJ Behar advised the City of Lauderdale Lakes during construction and worked with the City to dose out the project. Also, RJ Behar helped the City to obtain FDOT certification for Local Agency Program (LAP) funding for this project as well as other of their capital improvement projects before construction. 2 RR.J.Behar RFQ No. 14-07-021 Page 13.5 ROBERT BEHAR; PE EDUCATION M. E. Civil Engineering, University of Florida, 1975 B. S. Civil Engineering, University of Florida, 1974 YEARS OF EXPERIENCE 38 Years PROFESSIONAL REGISTRATIONS • P. E. Florida License No. 2175511980 • P. E. Kentucky License No. 1983611997 • P. E. Indiana License No. 1980004711997 • P. E. Michigan License No. 620104365511997 • P. E. Ohio License No. E-6264 ENGINEERING EXPERIENCE YEARS WITH RJ BEHAR 1999 - Present PROFESSIONAL SOCIETIES • American Society of Civil Engineers • Florida Engineering Society • Institute of Transportation Engineers • Transportation Research Board He began his engineering career in 1977 with the Florida Department of Transportation, and has over 35 years of experience in the planning, design and management of transportation projects nationwide. He has worked on projects for many municipalities throughout South Florida. He has been very active member of various engineering societies where he has served as president of the South Florida Section and Miami -Dade Branch of the American Society of Civil Engineers, Chair of the American Society of Civil Engineers Highway Division, Chair of Florida Institute of Consulting Engineers Transportation Production Committee, and member of the Transportation Research Board's Geometric Design Committee. Mr. Behar was awarded the Ben Watts Partnership Award in 2010. RELEVANT EXPERIENCE PS-200 Force Main in Annexation Neighborhood Area • Construction Inspection Services — City of Hialeah, Florida Principle in Charge — The scope includes attending preconstruction meetings, reviewing and processing payment applications, approving schedule of values, monitoring and trading the contractor's progress and schedule, coordinating the review and approving the contractor's MOT plans, maintaining accurate logs, responding to RFIs, assisting and coordinating with the utility companies and City Departments, overseeing substantial and final inspections, and preparing certifications and dose -out permits for installation of gravity sewer mains and force mains within the neighborhood. OKEECHOBEE BOULEVARD (SR-714) Construction Engineering Inspection — LAP Palm Beach County, FDOT District 4 Principle in Charge — The scope included a new second left -hand turn lane on the west approach to the intersection, an auxiliary lane to allow for EB traffic, a right turn lane to provide WB traffic, milling and resurfacing of existing pavements, drainage improvements, sidewalks, a new combined traffictrail signal system, lighting, signing and pavement markings. NE 33rd Avenue Neighborhood Improvement — City of Fort Lauderdale, Florida Construction Project Manager - This project consisted of reconstruction and improvements to the NW 33rd Avenue Neighborhood, from NW 191, Street to NW 29� Street, which included water main line replacement, drainage improvements, lighting improvements and roadway rehabilitation. Value $ 3,600,000 North County Neighborhood Improvements, Phase II • Construction Engineering Inspection Services — Broward County Water and Wastewater Department Construction Support Assistant providing construction observations, quantity verification, preparation of monthly and final estimates documentation, projections of costs and quantities, preparation of contract work orders/ change orders/supplemental agreements, reviewing invoices, tracking material certification documents and other tasks as necessary. SR-7/Sunrise Boulevard • Construction Inspection — City of Lauderhill, Florida Principle in Charge for this intersection improvement project, for the City of Lauderhill. This project involved widening and reconstructing a major urban arterial intersection, this was achieved through an agreement between FDOT and the City. It included extensive utility coordination, resulting from the widening of SR -7. The project was under FDOT oversight, as SR -7 is a slate road. The project also involved drainage improvements, signalization and lighting. The project required a complex Maintenance of Traffic plan including periodic lane closures. RFQ No. 14-07-021 Page 13.6 ROBERT BEHAR. PE Ocean Avenue Bascule Bridge Over Intracoastal in Lantana, Palm Beach County, Florida ® Principle in Charge for the Test Pile driving operation performed by the contractor, GLF Construction Company. The Pile Driving Installation inspection consisted of verification of driving criteria for the test piles being driven as part of the test pile installation plan, including pile location, design criteria, soil boring data, and installation operation. Collecting pile driving data with saximeter in dose coordination with the Geotechnical Engineering Company (GRL), PDA analysis data collection and pile driving evaluation, hammer energy determination, accessories verification and documentation, pile condition and measurements, equipment and template location including survey monitoring, and documentation. The foundation for the new bridge consists of Abutment 1 and Abutment 8, Intermediate Piers 2 through Pier 7, and bents for a new fishing pier. W. 530 Street (from W. 12TH Avenue to W. 16TH Avenue) Construction Engineering Inspection (CEI) — City of Hialeah, Florida; American Recovery & Reinvestment ACT (ARRA) Principle in Charge for the West 53rd Street (from W. 12th Avenue to W. 16th Avenue) ARRA- funded Reconstruction Project. Compartment - C Construction Inspection, Clewiston, Florida — AECOMISouth Florida Water Management (SFWMD) Principle in Charge — The field inspector provided change order reviews, material takeoffs, as -built plan reviews, contractor payment application reviews, and processing change orders, submittals, field orders, requests for additional information and payment requests. S-197 Replacement Project Replacement Project, Construction Inspection Services — SFWMD Principle in Charge - Responsibilities included scheduling material testing such as Earthwork tests with proctors and density test performed on existing or imported materials, also concrete testing with slump test and cylinders made for each concrete pour. The work performed each day was documented in written daitys also photographs were taken of all construction activities. S -332D Pump Station Hardening, Construction Management, Miami -Dade, Florida — SFWMD Principle in Charge — This project involved the hardening and upgrading of the S -332D Pump Station located near Homestead, Florida in Miami -Dade County. The project involved the hurricane hardening of the pump house and the installation of bullet- proofing for the walls, roof and roofing system, exterior doors, louvers, HVAC upgrades and protective opening hoods. The scope also included new weather -proof roof- mounted equipment access hatches, an OSHA safety ® ladder and roof perimeter safety railings and overall exterior repainting of the pump house walls and supporting exterior concrete foundations, as well as con construction management and inspection support services. Construction Management Oversight — City of Lauderdale Lakes, Florida Principle in Charge — This project consisted of construction of 'The Island'at Veteran's Memorial Park located at the intersection of SR -7 and SW 36"137" Street. RJ Behar advised the City of Lauderdale Lakes during construction and worked with the City to dose out the project. RJ Behar helped the City obtain FDOT certification for Local Agency Program. Miami River Greenways, Segment D — City of Miami, Florida Principal in Charge — The project consists of the reconstruction of an existing roadway segment along the Miami River to produce a scenic, landscaped, pedestrianlbicyde walkwaylgreenway. The project includes the design of a drainage system with injection wells, decorative lighting and landscapemardscape design. Davie Road Beautification Streetscape Project — Town of Davie, Florida Principal in Charge for the Downtown Davie streetscape beautification designlbuild project. The project consisted of street resurfacing, new lighting sidewalk replacement. Town of Davie Local Agency Program (LAP) Certification — Town of Davie, Florida Principal in Charge — RJ Behar assisted the Town of Davie in obtaining FDOT certification for Local Agency Program (LAP) funding of town capital projects. Stirling Road Loop Grant Assistance — Town of Southwest Ranches, Florida Principal in Charge — RJ Behar assisted the Town of Southwest Ranches in obtaining funding for the construction of the Stirling Road Loop Multipurpose Trail. Services provided cost estimates, conceptual plans and technical support during the coordination phase. NW 44th Street — City of Lauderdale Lakes, Florida Project Manager — The project included the design and construction management of new construction for approximately 0.5 mile. The scope of services included drainage plans, marking and signing plans and lighting plans. Seven Isles Entry Beautification — City of Fort Lauderdale, Florida Principal in Charge — The project consisted of improvements to the 7 isles entry way, these improvement induded, adding a parking space on the west side of SE 231d Avenue as well as beatifying two of the existing bridges WR.J.Behar RFO No. 14 -07 -02 1 Page 13.7 J UAN H. VAZQUEZ, PE, EDUCATION B. S. Civil Engineering, University of Puerto Rico, 1985 YEARS OF EXPERIENCE 29 Years PROFESSIONAL REGISTRATIONS • P.E. Florida License No. 5114311996 • P.E. Virginia License No. 0402 02560411994 • P.E. Puerto Rico License No.11385/1989 • P.E. Michigan License No. 46482/1999 • Professional Hydrologist License No. 05- H- 165312006 • Board Certified Environmental Engineer 07- 2000912007 YEARS WITH RJ BEHAR 2000 - Present PH, BCEE PROFESSIONAL SOCIETIES • American Society of Civil Engineers • Association of Engineers &Land Surveyors, Puerto Rico • American Society of Highway Engineers • American Public Works Association • American Institute of Hydrology • Florida Institute of Consulting Engineers, Water Resources Committee Member ENGINEERING EXPERIENCE • American Academy of Environmental Engineers Mr. Vazquez has more than 28 years of civil engineering experience including: preparation of stormwater master plans, drainage studies, and street improvements. He has designed highways, interchanges, intersections,(both urban and rural), prepared pavement designs, transportation studies, hydrologic - hydraulic (H -H) and scour studies, utility relocations, etc. He recently managed a general engineering service contract for the South Florida Water Management District. Mr. Vazquez has worked in several states; New York, Virginia, Arkansas, Idaho and Pennsylvania, for the Federal Highway Administration. He worked in construction projects, monitoring and supervising construction daily operations like the rehabilitation of George Washington Memorial Highway in Mt. Vernon, D.C., and the Construction of a 10 -mile St. Joe River Road, from Calder to Avery, Idaho. In the Federal Aid assignments he was requested to review the Project Development and Environmental study documents, and construction operations for several interstate projects. In addition he was assigned to several statewide final inspections of railway crossings, and others. Mr. Vazquez is a Professional Hydrologist (PH) and a Board Certified Environmental Engineer (BCEE) specializing in water supply and waste water. For the six year in a row, Mr. Vazquez is in the 'Who's Who book of Environmental Engineering, 2013'. He is currently the past president of the Association of Engineers and land Surveyors of Puerto Rico, Florida Chapter. RELEVANT EXPERIENCE Seaboard Marine Cargo Terminal Redevelopment Phase III, Port of Miami, Florida Principal in Charge. He provided quality control and project management services for drainage design of the Seaboard terminal at the Port of Miami redevelopment. He is also the Engineer of Record for modifications and injection well permitting. North County Neighborhood Improvement Project — Broward County, Florida Engineer of Record for the drainage design. He supervised, managed and provided quality control reviews for the drainage design of Broward County's North County Neighborhood Improvement Project. Historic Miramar Drainage System Evaluation - City of Miramar, Florida Project Manager for re- evaluation of the City's Canal System and evaluation of the neighborhood drainage systems. Fort Lauderdale/Hollywood International Airport Stormwater Master Plan, Florida Project Manager who prepared the Stormwater Drainage Master Plan, the stormwater management master plan phase I, AdICPR computer program modeling, and permitting with South Florida Water Management District and Broward County Department of Natural Resource Protection. He developed a master procedure manual for preparing NPDES permits for runoff associated from construction activities. This manual includes procedures for preparing permit applications and developing Stormwater Pollution Prevention Plans. Design consultants responsible for the design of the airport expansion plan improvements will use this manual. Was project manager for the preparation of the master permit procedures for program wide dewatering activities and preparation of specifications for handling contaminated groundwater from the dewatering activities. 11 R.J.Behar RFQ No. 14-07-021 Page 13.8 JUAN H. VAZQUEZ. PE, PH. BCEE? Wilde Park — City of Hialeah, Florida ® Drainage Engineer for a park beautification project which included parking lots, paving, grading and drainage plans Stormwater Design Review for T-4 Apron Replacement — Fort Lauderdale Hollywood International Airport Drainage Engineer: He provided reviews of drainage reports and evaluations. Stormwater Master Plan — Evansville Indiana Airport Drainage Engineer: Prepared the scope of work for the Airport's stormwater master plan to evaluate future airport expansion projects, and set up a work plan for the preparation of the stormwater management master plan. He conducted field reviews, and data collection tasks. The scope included conceptual systems designs, and planning. Miramar Canal System Evaluation — City of Miramar, Florida Project Manager for the site evaluations to determine the existing conditions of the canal system. He managed the evaluation of the drainage basins, siltation and deterioration of seawalls. Mr. Vazquez reviewed the AdICPR basin evaluation model. North County Neighborhood Improvement Project — Broward County Water and Wastewater Services, Florida Reviewer/Environmental Engineer. Provided peer review of Reclaimed Water Master Plan, water and sewer plans, and roadway /sidewalks C- 121013 Canals Interconnect — Broward County Water and Wastewater Services, Florida Project Manager and engineer of record for design of a canal culvert connection, gated control structures and permitting. Project Manager for the neighborhood improvements and designed a stormwater pump station. FDOT Exfiltration Design Manual — Florida Department of Transportation, Central Office Team member responsible for the preparation of a Drainage Design Manual on exfiltration systems, in particular, the chapter on stormwater injection wells. District Engineers Permit Reviews — Central Broward Water Control District (CBWCD) Technical Expert. He provided hydrologic - hydraulic expertise and reviewed technical issues regarding projects. He provided hydraulic design of a large culvert canal crossing. Area West of US 1 Drainage Study — City of Hallandale Beach, Florida Drainage Engineer. He prepared a master drainage study to analyze existing conditions and develop alternatives to resolve and mitigate flooding problems. NE 32"d1331d Avenue and NE 171' Avenue — City of Fort Lauderdale, Florida Drainage Engineer. He was responsible for the development of improvements to the drainage system, and in charge of reviewing reports and calculations. SW 2"d Avenue — City of Fort Lauderdale, Florida Drainage Engineer. He performed a review of the existing drainage system and proposed altematives for improvements. A report of the findings was completed and discussed with the City's staff. Ansin Boulevard, Drainage Improvements — City of Hallandale Beach, Florida Project Manager. He was in charge of the design for roadway and drainage improvements in the industrial area of Ansin Boulevard. NW 87d' Avenue (SR- 9731Galloway Road) Miami -Dade County, Florida — FDOT, District 6 Engineer of Record for drainage and preparation of the NW 8711 Ave. Bridge Hydraulic Report. Project length: 1.90 miles Canal C -11S Crossing at Flamingo Road, Broward County, Florida —ABO Farms, Inc. Drainage Engineer. He conducted a hydraulic study and evaluation of alternatives that included a Conspan bridge crossing. He prepared plans, and coordinated permitting for the new crossing of canal C -11S for a private developer. A 25' x 16' super span corrugated metal culvert was selected. Battersea and Douglas Road Drainage Improvements — City of Miami, Florida Task Manager. He supervised the design of drainage improvements to alleviate a flooding problem at the intersection of two city streets. North Andrews Gardens Neighborhood Improvement Project, Broward County Office of Environmental Services Drainage Engineer. He performed drainage calculations for the FDOT drainage connection permit. Andrews Avenue, Broward County, Florida — FDOT, District 4 (Keith & Schnars, PA) Engineer of record for the preparation of pond siting report and design of stormwater management system. He performed quality control of the design plan, drainage report and permitting packages. The project also included nutrient analysis for removal of phosphorous and nitrogen loads. Miami River Greenways, Segment D — City of Miami, Florida ® Engineer of Record for the design of the system of French drains and injection wells, to handle runoff. Also managed the �;g of the drainage systems with Miami -Dade DERM and Florida Department of Environmental Protection. �u R.J.Behar RFQ No. 14 -07 -02 1 Page 13.9 JUAN H. VAZQUEZ. PE. Pit. BCEE NW 87th Avenue (SR-973/Galloway Road) Miami -Dade County, Florida - FDOT, District 6 ® Engineer of Record for drainage and preparation of the NW 8711 Avenue Bridge Hydraulic Report. Project length: 1.90 miles Palmetto Greenways Expansion — City of Boynton Beach, Florida Drainage Engineer. Designed the stormwater management system and permitting for a new Greenway. NW 44th Street — City of Lauderdale Lakes, Florida Engineer of Record for drainage and permitting. NW 51h Street Bridge Replacement, Miami, Florida — FDOT, District 6 Task Manager/Drainage Engineer for drainage and preparation of the Bridge Hydraulic Report. This project includes major utility coordination and large offsite areas discharging thru the project. Royal Palm Boulevard Pavement Repairs — City of Coral Springs, Florida Engineer of Record for design of pavement repairs Palm Avenue — City of Hialeah, Florida Engineer of Record for drainage design. He completed permitting, quality control reviews and prepared specifications including specialty items such as street docks. C 4 Canal Flood Protection Belen Section — South Florida Water Management District (SFWMD) Project Manager. He was in charge of the design of a flood wall, and new drainage outfalls in the area of Belen, Miami - Dade County. Miramar Town Center Bridge Culvert — City of Miramar, Florida Project Manager for the structural design of a canal bridge Culvert. Countess De Hoemle Park — City of Bow Raton, Florida Task Manager. He provided structural engineering services to support design of the buildings and new signals. Task will indude conduct field reviews, data collection, review building ordinances, attend meetings with the City, conduct design analyses and computations for the project structural elements for each structure. Wilde Park — City of Hialeah, Florida Drainage Engineer for a pads beautification project which included parking lots, paving, grading and drainage plans. Bucky Dent Park Drainage Study — City of Hialeah, Florida ® Drainage Engineer. He prepared a drainage study to address flooding problems at the park. Lua Curtis Library Parking lot — City of Hialeah, Florida Civil EngineerlDrainage Engineer. He prepared grading, drainage plans, water and sewer connections for a parking lot in the City of Hialeah. J.F.K. Library Parking Lot — City of Hialeah, Florida Drainage Engineer. He prepared grading, permitting and drainage plans for a 4 -acre packing lot within the City of Hialeah. NW 7111191h Avenue Connector, Project Development and Environmental (PD &E) Study — FDOT, District 41City of Fort LauderdaleBroward County, Florida Drainage Engineer for the PD &E study of the NW 7"19" Avenue connector through downtown Fort Lauderdale. The study included environmental documents, alignment alternative and corridor analysis, and right -of -way relocation plans. He developed the location hydraulic report. North County Neighborhood Improvement Project — Broward County Water and Wastewater Services, Florida Reviewer/Environmental Engineer. Provided peer review of Reclaimed Water Master Plan, water and sewer plans, and roadwaylsidewalks. Crown Linen Water and Sewer Plan — INGEMEL S. A. Project Manager for the design of new water and sewer connections and permitting services for a laundry facility expansion within the City of Hialeah. Sistrunk Boulevard Water Line Replacements — City of Fort Lauderdale, Florida Engineer of Record for the design of water line upgrades. The project included jack and bore under railroad and directional drilling under US 1. Shady Banks Septic Tank Conversion Project — City of Fort Lauderdale, Florida Project Manager /Engineer of Record for the conversion of a neighborhood, from septic tanks to a sanitary sewer system. Stormwater Pollution Prevention Plan (SWPPP) 1 -95 Pump Station — Broward County, Florida Project Manager for the preparation of a Storrs Water Pollution Prevention Plan for the construction of a 120-ds pump station, 84 -inch effluent piping, drainage ditch and C -10 canal dredging. He also prepared plans for the reconstruction of SW 30� Avenue and site plans for the pump station. ItR.J.Behar RFQ No. 14-07-021 Page 13.10 CARLOS MAZORRA, PE EDUCATION B. S. Civil Engineering, University of Miami, 1983 YEARS OF EXPERIENCE YEARS WITH RJ BEHAR 29 Years 2002 - Present OFFICE LOCATION Pembroke Pines, Florida PROFESSIONAL REGISTRATIONS P. E. Florida License No. 42653, 1990 ENGINEERING EXPERIENCE Mr. Mazorra has been the Project Engineer/Manager for the preparation of numerous, very successful highway construction plans, which included the design of horizontal and vertical geometry with GEOPAK software. He has performed drafting plans, profiles, cross sections, traffic controls and various ancillary roadway plan sheets using MicroStation software. Mr. Mazorra has designed roadway signal plans in collaboration with traffic engineering and structural engineering personnel. He has 11 years of experience as an FDOT employee and knows the policies and needs of the FDOT; from both a technical and managerial perspective, and can thereby assure the success of any project. At RJ Behar, Mr. Mazorra is responsible for the design, project management and quality control for the Company's Highway Group. He has 28 years of experience. RELEVANT EXPERIENCE Districtwide Minors Contract— FDOT District 4 Project Manager on the task work order basis project. His duties include managing and negotiating various tasks including roadway design, traffic engineering, cost estimating, safety studies and drainage plans. SR -A1A from SR-838/Sunrise Boulevard to NE 181h Street TWO 12, Broward County, Florida - FDOT District 4 Districtwide Minors Contract Project Manager — He was responsible for overseeing the task and making sure that all work was submitted to the Department. Review of Safety Studies, TWO 10, Broward County, Florida- FDOT District 4 Districtwide Minors Contract Project Manager — He reviewed safety studies prepared for the Department to check for feasibility. SR- 911.95 Lake Worth Viaduct TWO, Palm Beach County, Florida - FDOT District 4 Districtwide Minors Contract Project Manager. He prepared plans for a high friction surface treatment for 1 -95. Pembroke Road at SW 18411 Avenue Signal Replacement, Broward County, Florida — Broward County Construction Project Manager. He was responsible for preparing the roadway, signal, and pavement marking plans. School Zone Flashing Signals, Coral Springs, Florida — City of Coral Springs He was responsible for the plans for the school zone warning signal. DesignBuild for Reconstruction of SR -874, Miami -Dade County, Florida — Miami -Dade Expressway Authority (MDX) He was responsible for preparing all of the signal plans. SR-805/Dixie Highway at 1P Avenue, Palm Beach County, Florida - FDOT District 4 Project Manager for this safety improvement project. He was responsible for the roadway, signal, pavement and marking plans for this project. Project Scope and Long Range Estimate Development, Florida Department of Transportation He developed basic scopes and long range estimates for several projects. Design/Build 1.75 at Miramar Parkway, Signal Plans, Broward County, Florida — FDOT District 4 Engineer of Record for the signal plans. SR- 820 /Pines/Holtywood Boulevard from East of 641" Way to West of SR -1, Broward County, FL — FDOT, District 4 Project Manager — Responsible for the design and production of roadway, signing and pavement marking and signalization plans. The scope of work includes milling and resurfacing (RRR) of the existing pavement; upgrading roadway signs and curb ramps to meet the current ADA standards, upgrading pedestrian and signal features and landscape improvements. n `�1 I . r•u J.Behar RFQ No. 14 -07 -02 1 Page 13.11 CARLOS MAZORRA. PL SR- 8381Sundse Boulevard at NW 31" Avenue, Broward County, Florida — FDOT District 4 ® Project Manager in charge of the design and production of roadway plans, signing and pavement marking plans, signalization plans, and pedestrian upgrades. The scope of this safety improvement project was the addition of two left turn lanes, milling and resurfacing, and pavement widening and the addition of two new signal mast arms. SR- 8381Sundse Boulevard at NW 271^ Avenue, Broward County, Florida — FDOT District 4 Project Manager in charge of the intersection improvements, rebuilding the signal system, milling and resurfacing the intersection approach and lighting improvements plans. Design/Build for 1 -595 Final Design Public- Private- Partnership Project, Broward County, Florida — FDOT District 4 Task Manager — He was in charge of the design and production of the signalization design of twelve intersections and temporary signals, and for lighting plans from West of Flaming Road to East of Hiatus Road, Zones 2 and 3. SR- 845/Powedine Road, Palm Beach County, Florida — FDOT, District 4 Project Engineer for signal design, which included 8 major signalized intersections with galvanized mast arms, signal analysis and new signal timings. SR- 51US- 11South Federal Highway, Deerfield Beach, Florida — FDOT, District 4 Project Manager — He was responsible for the milling and resurfacing plans of the existing pavement; upgrading the signal pedestrian features to current American with Disabilities Act (ADA) standards, new signing and pavement markings with upgraded landscaping. SR- 9731NW 87"' Avenue /Galloway Road, Miami -Dade County, Florida — FDOT, District 6 Project Engineer in charge of the signalization plans for the project. SR- 8061Adantic Avenue Milling & Resurfacing from Via Flora to RE of Congress Avenue, Palm Beach County, Florida — FDOT District 4 Project Manager — He was responsible for the milling and resurfacing of a major arterial roadway, induding overseeing the drainage improvements, preparing the pavement marking and signing plans, lighting plans, eight signal location plans, a public involvement program and landscape improvements. Hollywood Boulevard/N. 28"' Avenue Intersection Improvement, Broward County, Florida — Broward County Engineering ® Project Manager — He was responsible for overseeing the traffic study, and preparing the roadway plans, signalization plans, signage plans, drainage plans, ADA requirements and utility coordination for this major intersection improvement project. Hillsboro Boulevard /Military Trail Intersection Improvement, Broward County, Florida — Broward County Engineering Project Manager — He was responsible for overseeing the traffic study, and preparing the roadway plans, signalization plans, signage plans, drainage plans, ADA requirements and utility coordination for this major intersection improvement project. Atlantic Boulevard/Rock Island Road Intersection Improvement, Broward County, Florida — Broward County Engineering Reference: Mr. Richard Tomese, PE, Director of Broward County Engineering, (954) 5774579, Rtomese a()Broward.org Project Manager — He was responsible for overseeing the traffic study and preparing the roadway plans, signalization plans, signage plans, drainage plans, ADA requirements and utility coordination, and post design services for construction engineering inspection for a major intersection improvement. Project length: 0.501 miles NW 4411 Street, City of Lauderdale Lakes, Florida — Lauderdale Lakes Reference: Ms. Sonia M. Torres, PE, LEED AP, City Engineer - Public Works and Engineering Services, (954) 535 -2712, stores dlauderdatelakes.oro Project Manager — He was responsible for the design of roadway plans, signing and marking plans, privacy walls, traffic projections and warrant analysis, utility coordination, inspection services and oversaw the drainage and permitting for this reconstruction project. SR- 5NS- 11Federal Highway Resurfacing, Boca Raton, Florida — FDOT, District 4 Reference: Ms. Vanita Saini, PE, FDOT Project Manager, (954) 777 -4468, Vanita.saini(o )dot.state.fl.us Project Manager — He was responsible for the milling and resurfacing plans of the existing pavement; upgrading the signal pedestrian features to current American with Disabilities Act (ADA) standards, new signing and pavement markings with upgraded landscaping. r1 ICJ R.J.Behar RFD No. 14 -07 -021 Page 13.12 RAFAEL DE ARAZOZA, PE, PTOE, CPM EDUCATION • Miami -Dade College, Miami, Florida, ASCET, 1972 • Florida International University, Miami, Florida, BSCET, 1975 • Florida State University /FDOT, Certified Public Manager (CPM), 1989 YEARS OF EXPERIENCE 38 Years PROFESSIONAL TRAINING • Urban Transportation Planning • Highway Capacity /Level -of- Service Analyses • Transportation Modeling • Air Quality Analyses • Highway Financing • Traffic Impact Analyses • Traffic Operations and Safety Analyses • Traffic Engineering /Design • Roadway Design, Roadway Safety ENGINEERING EXPERIENCE YEARS WITH RJ BEHAR 2010 - Present =8114-1-1101 : 1-1 RZ4*3 [ 11:7_1li[$]zM • P. E. Florida License No. 24487/1980 • Professional Traffic Operations Engineer (PTOE) No. 2852/2010 • Florida State /FDOT, Certified Public Manager (CPM) /1989 Mr. De Arazoza experience includes supervising and providing technical guidance and support to transportation planning, roadway design and traffic engineering personnel throughout his career. He provided and continues to provide management and technical support for traffic engineering and safety studies, transportation planning, land use planning, including public involvement and coordination with local governments. He provided quality assurance and quality control on all of the above activities. He has worked in both private and governmental agencies, including FDOT and Broward County. Mr. De Arazoza has held many high level management positions throughout his career. He is well -versed in traffic engineering and roadway design standards and procedures. REVELANT EXPERIENCE: Transportation Master Plan and Transportation Concurrency Management Areas (TCMAS) - City of Miami Gardens, Florida Project Manager responsible for complete development of the Transportation Master Plan, including public involvement, analyses of existing and future conditions of the transportation system; development of transportation improvement projects addressing not only roadways but multi-modal projects as well. He developed an implementation plan including existing available and forecasted transportation funds and received approval by the City Council and the (MPO) process. SR- 9731NW 8711, Avenue, Traffic Study, Miami -Dade County, Florida — FDOT D6 Project Manager — He is in charge of a comprehensive traffic operations study to evaluate alternatives and determine potential improvement recommendations in developing traffic projections. Project Length: 1.90 miles. Transportation Master Plan and Transportation Concurrency Management Areas (TCMAS) — City of Doral, Florida Project Manager responsible for complete development of the Transportation Master Plan including public involvement, analyses of existing and future conditions of the transportation system; development of transportation improvement projects addressing not only roadways but multi-modal projects as well. Transportation Planning 8 Traffic Engineering Consulting Services — Town of Cutler Bay, Florida Project Manager — Transportation Element and Transportation Plan Lead staff. Performed work consisting of traffic engineering, traffic calming and safety studies as well as reviewing traffic impacts of proposed land developments. Traffic engineering work included capacityllevel -0f- service analyses, traffic signal warrant studies, intersection and arterial studies, QR.J.Behar RFQ No. 14-07-021 Page 13.13 RAFAEL DE ARAZOZA, PE, PTOE, CPM ® safety studies, potential impacts of proposed land use developments. He successfully developed traffic calming and traffic engineering studies for the Town. As one of the key staff, he contributed successfully in the development of the Town's Transportation Element and Transportation Master Plan. Update of the Transportation Element, City of Hialeah, Florida — Miami -Dade County Project Manager who updated of the City's Transportation Element to incorporate the annexed area northwest of the existing City boundaries. The study consisted of analyzing existing and future conditions on the transportation system and developing a future transportation system to include required improvements. This project was extensively coordinated with reviewing agencies and received approval by the City Council as well as both State agencies, the Department of Community Affairs and the FOOT. SR-874/Don Shula Expressway Ramp Connector to SW 13P Street (PD &E) Study — Miami -Dade Expressway Authority Project Engineer in charge of the required traffic engineering analysis and the development of major documents, such as the Interchange Modification Report (IMR) and the Design Traffic Technical Memorandum (DTTM). The study consists of the preparation of the PD &E traffic report, for the SR-874/Don Shula Expressway Ramp Connector to SW 1361, Street. The study assesses existing and future traffic operations of the interchange, given a No-Build scenario, and up to four Build scenarios. Project length: 4 miles. Safe Routes to School Plans Study — Miami -Dade County Metropolitan Planning Organization Task Manager — He coordinated the tasks involved in the project. RJ Behar conducted field reviews to verify the improvements and gather additional information to facilitate the development of cost estimates. RJ Behar developed the spreadsheets utilizing the latest cost rates available from FOOT District 6. Strategic Interrnodal System (SIS) Action & Master Plans — FDOT D6 He was a member of the statewide technical committee who assisted with the development and establishment of the SIS. He directed the development of the SR- 99711(rome Avenue and US- 2710keechobee Road Action Plans and the Following ® Master Plans: 1 -95 and 1 -195 in District 6. Donald Ross Road and 1.95 Interchange — Interchange Operational Analysis Report (IOAR) Palm Beach County, Florida — Palm Beach County Department of Engineering & Public Works Division of Roadway Production Project Manager — RJ Behar is providing professional Traffic Engineering Services, for the IOAR (Interchange Operational Analysis Report). The study area includes the two signalized intersections west and east of the 1-95/Donald Ross Road Interchange and the intersections of Donald Ross Road with Heights Boulevard east of the interchange. Additionally, the unsignalized intersection of 64" Drive N. and Donald Ross Road, located west of the interchange, is included. The study will include the appropriate ramps within the subject interchange. 0 am RFQ No. 14-07-021 Page 13.14 ANTHONY ALFRED, PE EDUCATION B. S. Civil Engineering, Florida International University, 1991 YEARS OF EXPERIENCE YEARS WITH RJ BEHAR 23 Years 2006 - Present OFFICE LOCATION Pembroke Pines, Florida PROFESSIONAL REGISTRATIONS P. E. Florida License No. No. 5185711997 ENGINEERING EXPERIENCE Mr. Alfred has extensive experience in transportation design engineering. He is well -versed with the FDOT design and plans preparation process. He has participated in public involvement, and has been the Utility Coordinator for many FDOT projects. He proficiently uses and trains staff on how to use MicroStation (V8) /GEOPAK running the FDOT Site Menu. Mr. Alfred has experience in the preparation of lighting analyses using the AGI32 software. He has used electronic delivery (PEDDS) to submit projects to FDOT, District 4. With 23 years of experience, Mr. Alfred brings a wealth of knowledge in transportation engineering and design. RELEVANT EXPERIENCE ROADWAY DESIGN EXPERIENCE Miami River Greenways, Segment D — City of Miami, Florida Project Manager — The project consists of the reconstruction of an existing roadway segment along the Miami River to produce a scenic, landscaped, pedestrian/bicycle walkway /greenway. The project includes the design of a drainage system with wells, decorative lighting and Iandscapelhardscape design. SR-836 Emergency Access Ramp, Miami -Dade County, Florida — Miami -Dade Expressway Authority (MDX) Project Manager — Mr. Alfred provided the design and engineering services, roadway plans, traffic control plans, drainage analysis, environmental permits, utility coordination, lighting plans, signing and marking plans, structures (retaining walls) and special access gates. The project consisted of the creating a single lane ramp that connects the Florida Tumpike on- ramp to the westbound SR-836 extension for emergency use only. This design was considered 'complex - highway.' An emergency u -tum was designed on the SR -836 Extension between SW 1271h Avenue and SW 1371h Avenue. The design of a retaining wall was also required along the alignment in the vicinity of the South Florida Water Management District C -2 Canal. All the associated drainage design, environmental permitting and utility coordination were part of this project as well. Project length: 1 mile. Districtwide In -House Consultant Plans Review /Support Services, Fort Lauderdale, Florida — FDOT District 4 Project Manager — Plans Review: The project includes reviews for compliance with FDOT criteria, construction time estimate preparationlreview, review of computation booklets, specification packages, cost estimates, etc. The deliverables include review comments in the ERC database, marked -up plans, design exception variation reports, contract time estimates, traffic control plan reviewloonstructability, quantity computations with pay item verifications, utility conflicts, right -of -way encroachments, etc. Design Support Services: Perform design services for the FDOT issued on a Task Work Order basis. The deliverables will be CADD compliant, in electronic format, signed and sealed with PEDDS. Design support includes the handling of project managers duties for FDOT as well. SR-874 Milling and Resurfacing and Guardrail Installation - Miami -Dade Expressway Authority (MDX) Project Manager — Mr. Alfred WAs responsible for providing roadway plans for the resurfacing of SR -874 from the C -100 canal to about 2,300 ft north and addition of guardrail in the median. Scope of services includes signing and pavement marking plans and modification to the existing SFWMD Environmental Resource Permit (ERP). SR-836 Auxiliary Lanes, Project Development and Environment (PD &E) Study, Miami -Dade County, Florida — MDX Project Engineer — The scope includes widening and construction of auxiliary lanes on SR-836 at NW 579, Avenue to the Toll Plaza. RJ Behar provided the drainage analysis, typical section package, utility coordination and the design variation package. KCR.J.Behar RFO No. 14-07-021 Page 13.15 E 11 A NTH 0NY ALFRED. PE North Bayshore Drive Roadway Improvements — City of Miami, Florida Project Engineer — The project consisted of roundabout construction along with milling and resurfacing. The scope of this project included roadway plans, signing and marking plans and landscaping plans. RJ Behar introduced the design of a roundabout (traffic circle) on the comer of North Bayshore Drive and NE 17" Terrace. Project length: 0.317 miles Downtown Miami Storm Sewer Project (North Bayshore Drive) — City of Miami, Florida Quality Control Engineer — The project consisted of a total reconstruction of the roadway and the design and implementation of a drainage system, which included the replacement of the subsurface drainage system. As part of the stormwater management system, drainage wells were utilized to assist in alleviating the flooding. The project required drainage calculations for approval from Miami -Dade County Department of Environmental Management (DERM). Hillsboro Boulevard/Military Trail Intersection Improvement — Broward County Engineering Senior Engineer who prepared the roadway plans, signing and pavement marking plans, drainage plans and utility coordination for this major intersection improvement project. NW 7t^l9t" Avenue Connector (Design) — City of Fort Lauderdale, Florida Project Engineer — The project included the roadway design of a 1.5 mile urban section, 4 -lane divided, connector between NW 7m and NW 92, Avenues in Downtown Fort Lauderdale. The scope of this project includes signalization, drainage design, signing pavement marking and permitting as well as public involvement coordination. Project length: .5 mile NW 441h Street Drainage Improvements — City of Sunrise, Florida Project Engineer responsible for the design plans, construction documents and specifications for the construction of a swale and sidewalk with tree wells. This included the typical section analysis, plans, cross sections, drainage structures, traffic control plans and stormwater pollution prevention plans. A drainage analysis was also performed for the design of the outfall structure, which connects to a local canal. Bus Shelter - Design Build — City of Lauderdale Lakes, Florida Project Engineer — Responsible for preparing the Design Build Criteria Package for the construction of five bus shelters along State Road 7, between Oakland Park Boulevard and Commercial Boulevard. This involved the preparation of the scope, contract requirements, specifications, etc. North Miami Avenue between NE 16911 Street & NE 170th Street — City of North Miami Beach, Florida Engineer of Record for addition of cul -de -sacs, curb and gutter typical sections, parking areas and drainage improvements. He also provided the utility coordination and the public involvement. SR-7/Sunrise Boulevard Lighting Design — City of Lauderhill, Florida Project Engineer and Utility Manager for the lighting plans preparation. This project consisted of roadway lighting design for SR -7IUS -441 at Sunrise Boulevard in the City of Lauderhill. The design was completed in accordance with the FDOT Roadway Lighting Criteria. Due to numerous existing utilities, the light pole foundations included the design of spread - footings as well as extensive coordination by Mr. Alfred, who functioned as the utility manager, with the utility owners. The project also involved procuring a permit from FDOT. Project length: 1.5 miles SW 32P Street (SR -9336) from SW 152nd Avenue to SW 13701 Avenue, City of Homestead, Florida — Miami -Dade County Public Works Department - Highway Division/Plans Review and Design Project Manager — The scope of the project included master planning and feasibility analysis for the new roadway. This project involved the upgrading of the existing traffic signals to mast -anus and internally illuminated signs. The design phase for this project comprised of drainage, lighting, signalization, signing and pavement markings. Project length: 1.52 miles East 561^ Street, East 41^ Avenue to East 81h Avenue — City of Hialeah, Florida Project Engineer — He developed the horizontal and vertical geometric design, drainage, typical sections and earthwork computations. He generated the quantities and prepared display boards for public involvement meetings. Mr. Alfred also coordinated utility relocations with the utility agency owners (UAO). East 5V Street, East 81^ Avenue to East of the UPS Entrance — City of Hialeah, Florida Project EngineerlUtility Coordinator— He developed the horizontal and vertical geometric design, drainage, typical sections and earthwork computations. He was also responsible for preparing the complete set of roadway, drainage, traffic control and signing/marking plans. He generated quantities and prepared display boards for and attended the public involvement meetings. Mr. Alfred also served as the utility coordinator. West 72nd Street — City of Hialeah, Florida Engineer of RecerdlUtility Coordinator — He designed and engineered all of the construction documents for the reconstruction of the roadway and drainage systems. He also performed all of the utility coordination. RFO No. 14 -07 -02 1 Page 13.16 JERRY PICCOLO, PE EDUCATION B. S. Civil Engineering, University of Florida, 1976 YEARS OF EXPERIENCE YEARS WITH RJ BEHAR 38 Years 2000 - Present PROFESSIONAL REGISTRATIONS • P. E. Florida License No. 2297911980 • Certified Bridge Inspector — Bridge Inspectors Training Program, FOOT 8 USF, 1982 ENGINEERING EXPERIENCE Mr. Piccolo serves as a Senior Highway, Bridge Engineer and Structures Department Manager for RJ Behar. He has a thorough understanding of advanced structural engineering and the associated computer skills. He also has a very practical background in bridge construction and construction contract administration procedures. This background enables him to produce a set of plans which are constructible, economical and rarely require supplemental agreements during construction. Mr. Piccolo has been the Project Manager and Engineer of Record for numerous very successful highway and bridge projects over the past 20 years as a consultant. Mr. Piccolo also has 15 years of experience as an FDOT employee. He was the first FOOT Bridge Engineer to design a bridge that withstood a ship impact (Choctawhatchee Bay Bridge) and the first to design a curved steel box girder superstructure (Thomasville Road Flyover). He was presented with the Bill Dean Award by FOOT and is listed in the Who's Who in Science and Engineering'. RELEVANT EXPERIENCE SR -AIIA in Ft. Pierce, Pines Boulevard at 1.75 and University Drive in Broward County, Florida — FDOT, District 4 Engineer — He performed Quality Control reviews SR -2 — FDOT, District 3 Engineer— He was responsible for Quality Control and Quality Assurance Review of Highway Plans. Structure Engineering Services — South Florida Water Management District (SFWMD) Structural Engineer for design services as subconsultant to the GEC team for refurbishment of navigation locks 5-61, S-65, S-65A 8 S-65D; lock hoist upgrades for navigation locks S -131, 5 -135, G -36; and spillway hoist upgrades to S -44 and G- 57. Northlake Boulevard over the Loxahatchee Slough — Palm Beach County, Florida Structural Engineer in charge of the bridge work and weir. The project consists of reconstruction of a four lane divided highway, construction of a bridge, weir and walkway. Project length: 0.25 miles Structure Inspection Program (SIP) Non -Sta Structures — South Florida Water Management District (SFWMD) Structural Engineer /Inspector performing structural inspections of 61 water control structures. These inspections were performed to ensure operational integrity and to avoid partial or total failure that could endanger the lives and safety of the public. Structural Plans Review Contract — Palm Beach County, Florida Project Manager — The scope of this contract included review of the bridge plans, bridge design calculations and bid item quantities. The roadway plans were reviewed to ensure that they were consistent with the bridge plans. One site review was conducted with each review, which focused on existing conditions such as utilities, correct bridge length and location as well as the condition of the existing bridges to be widened. Hurricane Sign Replacements — FDOT, District 4 Structural Engineer— He designed sign replacements in District 4 after Hurricane Frances and Jeanne. Battersea and Douglas Road Drainage Improvements — City of Miami, Florida Structural Design Engineer for the design of a concrete gravity wall, evaluation of the existing seawall and outfall. S -65C Navigation Lock Supplemental Inspection Structural Engineer— He performed a structural evaluation of the Navigation Lock Structure. RFQ No. 14-07-021 Page 13.17 JERRY PICCOLO. PE South Florida Water Management District North Region Structural & Mechanical Inspection Phase I — Okeechobee ® and Kissimmee, Florida Structural Engineer — He performed a detailed structural evaluation of 16 water control structures in the northern region of the District and prepared the structural components of the report with the findings including planning level cost estimates and recommendations of the required repairs. South Florida Water Management District North Region Structural & Mechanical Inspection Phase II — Okeechobee and Kissimmee, Florida Structural Engineer — He performed a detailed structural evaluation of 47 water control structures in the northern region of the District and prepared the structural components of the report with the findings including planning level cost estimates and recommendations of the required repairs. Structure S 310 Structural Evaluations — South Florida Water Management District (SFWMD) Structural Engineer — He performed a structural evaluation of the Clewiston Navigation Lock Structure from Lake Okeechobee. Golden Isles Bridge Improvements, City of Hallandale Beach Senior Structural Engineer for the inspection and design of new decorative style railings, bridge repairs and lighting supports. McDonald Park Pedestrian Bridge — City of Hialeah, Florida Structural Engineer — RJ Behar designed the pedestrian bridge across the lake at McDonald Park. The bridge superstructure was an aluminum truss and the substructure was prestressed concrete piles. During construction we provided construction supervision services for the pile driving and the aluminum truss installation Kissimmee River Boat Locks S-61, S- 65165A & S-65D — SFWMD, Town of Basinger Structural Engineer — Designed the rehabilitation of the Navigation locks, including gates, seals, structural steel repairs, concrete rehabilitation and general refurbishment. Also performed the engineering during construction services. Boat Lock Hoists S -131, S -135 & G -36 — SFWMD, North Shore of Lake Okeechobee Structural Engineer — Designed the replacement of the cable drum hoists for hydraulic hoists, a precast building for hydraulic power units and the cable ladder climbing system. Also performed the engineering during construction services. Fuel Tank Platforms at 17 Pump Stations — SFWMD, Miami to Kissimmee, FL Structural Engineer — Designed platforms, stairways and handrails for fuel tanks. Also performed the engineering during construction services. S -193 Boat Lock Refurbishment — SFWMD, Okeechobee, FL Structural Engineer — Designed the rehabilitation of the Navigation locks, including gates, seals, structural steel repairs, masonry building, fenders, catwalks, concrete rehabilitation and general refurbishment. Also performed the engineering during construction services. North Shore Trash Rakes at S -129, S -131, S -133 & S -135 — SFWMD, North Shore of Lake Okeechobee Structural Engineer — Designed the bridges, trash rake supports, steel sheet pile walls, bypass culvert stop log slots, operating platforms for new gates, mast davit supports, outlet structure platforms, bar screens, debris collection bins, fuel tanker truck containment slabs, and railings lubrication pump dog houses. Also performed the engineering during construction services. S -SA Intake Service Bridge Repairs — SFWMD, West Palm Beach Structural Engineer — Designed the removal for galvanizing steel bridge beams, replacing steel bridge grating, replace concrete superstructure, replace pump bell support rods, replace handrail, repair bar screen connections, repair scour wear in floor at pump bells, dean & paint pump bells, modify steel curb on bridge, install removable guardrail on bridge, and bridge expansion joint seals. Also performed the engineering during construction services. Powerline Road (SR -645) Palm Beach County, Florida — FOOT, District 4 Structural Engineer for the design of rehabilitation of the bridge over L 47 Canal. The project consisted of roadway design, drainage, pavement marking and signing plans, signal plans (7 locations) lighting and bridge plan services. The structural design included repairs to the bridge over Hillsboro Canal including new joints, guardrail connections, and riprap repairs. Project length: 3 miles. SR -AIIA Bridge over Boynton Inlet Bridge Rehabilitation — FOOT, District 4 Structural Design Engineer — He prepared plans for replacement of the concrete rails, guardrail attachments, sealing, repair of joints and also prepared plans for construction of eight new outfalls connecting to an existing seawall. The scope included the design plans for milling and resurfacing (RRR) for 5 miles of a major rural roadway, including drainage studies, ® drainage design, pavement marking and signing plans, signal plans, bridge plans, public involvement, lighting and landscape plans. %R.J.Behar RF(] No. 14-07-021 Page 1 3.78 J E R R Y P [CC O 1-0 . P E 1.95 Bridge over Donald Ross Road & C -18 Canal — FDOT, District 4 ® Structural Design Engineer — This project, for the Florida Department of Transportation, involved the widening of two medium span bridges. He prepared the bridge development report, structural plans, sound wall and retaining wall design. The design included the development of technical special provisions and permit coordination. US-1 Bridge over Biscayne Canal — FDOT, District 6 Structural Design Engineer — His responsibilities included marketing, price negotiations, client contact, project management and QC/QA for this project. NW 12th Street — FDOT, District 6 Structural Design Engineer — His responsibilities induced marketing, price negotiations, client contact, project management and QC/QA for this project. West 471h Street — FDOT, District 6 Structural Design Engineer — His responsibilifies induded marketing, price negotiations, client contact, project management and QC/QA for this project 45th Street Bridge — FDOT Turnpike Enterprise Structural Design Engineer — His responsibilifies included marketing, price negotiations, client contact, project management and QC/QA for this project. Oakland Park Boulevard Bridge over the C -13 Canal — FDOT, District 4 Structural Engineer — He was responsible for the design, shop drawings review and construction support for this structure. SR 530 — FDOT, District 5 Structural Engineer — Mr. Piccolo designed the bridge, sign structures and mast arms for this project. SR 85 Highway & Bridge Widening — FDOT, District 3 Structural Design Engineer — His responsibilities induded markefing, price negofiations, client contact, project management and QC/QA for this project. McClure Road Bridge Replacement — FDOT District 4 Structural Engineer — His responsibilities included marketing, price negotiations, client contact, project management and QC/QA for this project. ® US -27 Bridge Widening over Helena Run — FDOT, District 5 Structural Design Engineer — His responsibilities induded markefing, price negotiations, client contact, project management and QC/QA for this project. Hidden Acres Estates Feasibility Study — South Florida Water Management District (SFWMD) Structural Engineer — He performed structural evaluation of the feasibility to raise 17 mobile homes and attachments above projected flood levels. The project was part of the Kissimmee River restoration project. 1 -95 Bridge Repairs from Miami -Dade County Line to Griffin Road, FDOT Structural Engineer — This project for FDOT included the repair and upgrade of 16 bridges along 1 -95. The expansion joint seals at each bridge were replaced. The adjacent headers and steel armor angles were repaired as necessary. The project also included structural pile jackets, spall repairs, riprap repairs and class V finish. During constructon we reviewed shop drawings, responded to RFI's and assisted the CEI in making field decisions regarding the header repairs: ROADWAY PROJECT DESIGN EXPERIENCE Poweriine Road (SR -845) Broward County, Florida — FDOT, District 4 Engineer — He provided Quality Control reviews and mast arm calculations. 1.595 Highway Improvements, Broward County, Florida — FDOT, District 4 Engineer — He provided design calculations for the overhead sign trusses. 1 -95 HOV, Palm Beach County, Florida — FDOT, District 4 Engineer — He performed the Quality Control review for two separate 1 -95 HOV design contracts. The scope of services included geometrics, drainage, signing and marking with traffic control reviews. 1.95 Resurfacing, Broward County, Florida — FDOT, District 4 Engineer — He provided Quality Control reviews and prepared bridge joint repair plans. SR-806 (Atlantic Avenue) Palm Beach County, Florida — FDOT, District 4 Provide Quality Control reviews and mast arts calculations. Project included resurfacing (RRR) of a 2.8 miles section from Via Flora to Congress Avenue. The project included complete design of resurfacing 2.8 miles off a major arterial roadway, induding drainage improvements, pavement marking and signing, lighting plans, 8 signal locations, a public involvement program, and landscape improvements. Project length: 2.8 miles. ® Commercial Boulevard, Broward County, Florida — FDOT, District 4 Engineer — He performed Quality Control reviews and mast arm calculations. 1% R.J.Behar �nl RFQ No. 14 -07 -02 1 Page 1 3.19 DAVID ROMANO, PE CONSTRUCTION ENGINEERING INSPECTION/ M. S. Construction Management, Florida International University, 1995 B. S. Civil and Architectural Engineering, University of Miami, 1993 YEARS OF EXPERIENCE 19 Years AVAILABILITY CERTIFICATIONS: • American Society of Civil Engineers • Asphalt Paving Technician Level I & II • Earthwork Level I & II • Drilled Shaft Inspection • Pile Driving Inspection • Final Estimates Level I & II • QC Manager • ATSSA Florida Advanced Training Course • Maintenance of Traffic • ACI - Concrete Field Testing Technician • TROXLER - Nuclear Gauge Safety/Hazmat Training ENGINEERING EXPERIENCE YEARS WITH RJ BEHAR 2008 - Present TIN #: R550167713870 • TROXLER - Radiation Safety Officer • CSX Roadway Worker Protection • Concrete Field Inspector • Florida Stonmwater Erosion & Sedimentation Control • FDOT - 6 Hr Training Program: EEO, DBE and Payroll Compliance on Local Area Projects • FDOT - 8 Hr Local Agency Program Workshop • FDOT Effective Schedule and Claims Management Practices • FDOT Critical Structures Construction Issues Mr. Romano is a licensed Professional Engineer with a Master of Science Degree in Construction Management. He has over 19 years of experience specializing in the areas of Construction Engineering, Inspection and Management (CEI &M). He has worked as a Senior Project Engineer /Project Engineer on various roadway construction projects in Miami -Dade, Broward and Palm Beach Counties, for Florida's Department of Transportation (FDOT), Districts 4, 6, and the Turnpike, with an aggregate dollar value of over $200 million. Mr. Romano is responsible for overseeing construction operations, administration, management, quality control, monthly and final estimates (dose -out package) of projects. He is knowledgeable in all facets of CEI responsibilities including, oversight of construction operations, administration, public relations, quality control, final estimates and claims analysis. RELEVANT EXPERIENCE Arch Creek Bike Path and Pedestrian Bridge Replacement, North Miami, FL — City of North Miami Project Manager — His Responsibilities include overseeing the entire construction engineering and inspection services provided to the City of North Miami, this includes ensuring all tasks are being completed by the senior inspector as well as the resident compliance specialists. He attends progress meetings, completes the meeting minutes and coordinates between the local agency and the Florida Department of Transportation, District 6. Federal Highway (US -1) Beautification, Delray Beach, FL — City of Delray Beach Senior Project Engineer — He is responsible for overseeing the entire construction engineering operations, administration, management, and quality control of construction for this project. The scope of the project consists of complete reconstruction, including widening for a street parking area, the addition of a 4 -foot bike lane, new left turn lane, new sidewalks, curb and gutter, decorative lighting, sod placement; and water main upgrades. SE 151^ Ave. Bridge Replacement, Ft. Lauderdale, FL — City of Ft. Lauderdale Senior Project Engineer - As Project Engineer, Mr. Romano was responsible for overseeing the entire CEI operations, administration, management, and quality control of construction for this project. Mr. Romano managed the contract, supervised and oversaw the field inspection and administrative personnel, ensured proper understanding of the plans and specifications, checked the pile driving log records, verified and monitored the vibration levels around all existing adjacent structures, reviewed pile as -built installation plan, reviewed and analyzed engineer analysis reports for out of tolerance piles, and was responsible for confirming and verifying approval of all the materials incorporated into the project. Resurfacing of SW 1011 Street (SR -869) from Powedine Road to Newport Centre Drive, Hybrid Project — Florida Department of Transportation, District 4 WR.J.Behar RFQ No. 14-07-021 Page 13.20 DAVID ROMANO, PE Senior Project Engineer — He oversaw CEI operations which included ensuring the inspectors on site were maintaining ® dose coordination with the Dept Project Manager, City of Deerfield Beach Public Works Dept, and neighboring residential communities and businesses. The project consisted of milling, resurfacing, shoulder widening, minor drainage improvements, signalization and video detection improvements at the major intersections. Sidewalks were provided on the north side of the roadway, including ADA upgrades at the crosswalks, guardrail enhancements over the existing bridge structure, and landscaping improvements throughout the project. Cost/Fees Paid: $402,400.00 Construction Cost: $2,069.003.05 W.16'" Avenue from W. 76"' Street to W. 84'" Street, Hialeah, FI— City of Hialeah Senior Project Engineer — He was responsible for overseeing the Construction Engineering and Inspection operation, ensuring that the adherence to the rules and regulations set forth by FDOT speculations as well as ensure the Federal ARRA regulations were being followed. He oversaw all document control, change orders, pay requests, shop drawing logs, daily inspection reports and the completion of the project closeout. Cost/Fees Paid: $48,699.00 Construction Cost: $354,358.13 Contractor: Williams Paving, Inc. Replacement of Downtown North Miami Brick Pavers, Local Agency Program (LAP) and American Recover & Reinvestment Act (ARRA) Project, North Miami, FL — City of North Miami Reference: Mr. Aleem Ghany, PE, Director of Public Works, City of North Miami (305) 895 -9830 Senior Project Engineer — His responsibilities entailed the management of the project and all construction engineering personnel. Mr. Romano ensured that all the project documentation, including the sampling and testing of the material furnished, was being completed per the project schedule and all federal ARRA regulations were met. Cost/Fees Paid: $90,420.00 Construction cost: $821,000 Contractor: Florida Construction and Engineering, Inc. W. 531d Street from W. 120' Avenue to W. IP Avenue, American Recover & Reinvestment Act (ARRA) Project, Hialeah Fl — City of Hialeah Project Manager /Senior Project Engineer - Responsible for the construction engineering and inspection (CEI) operation of this project. This included overseeing the inspections that were preformed, shop drawing approval, cost estimates that were process and all other tasks performed by the CEI team. Mr. Romano also ensures that all procedures and regulations were performed per the Federal ARRA regulation standards and well as the Florida department of Transportation. Ocean Avenue Bascule Bridge Over Intracoastal, Lantana, Fl - Palm Beach County Senior Project EngineedTask Manager — Oversaw the inspector for the pile driving operation. The pile driving installation inspection consisted of verification of driving criteria for the test piles being driven as part of the test pile installation plan, including pile location, design criteria, soil boring data, installation operation, collecting pile driving data with saximeter in dose coordination with the Geotechnical Engineering Company, PDA analysis data collection and pile driving evaluation, hammer energy determination, accessories verification and documentation, pile condition and measurements, equipment and template location including survey monitoring, and documentation. Pines Boulevard (SR -820) and 1.75 (SR -93) Interchange, Local Agency Program (LAP) project, Pembroke Pines, Fl — City of Pembroke Pines Senior Project Engineer - Mr. Romano managed the CEI contract, supervised and oversaw the field inspection; ensured proper interpretation of the plans and specifications, checked the drilled shaft log records on all signals, high mast lights, and overhead truss structure sign foundations; reviewed and jointly approved with FOOT District Lab the contractor's drilled shaft installation plan; reviewed and analyzed engineer analysis reports for deficient items encountered during construction; ensured CSL Testing was performed as per the FDOT Specifications; provided guidance and resolution on field changes that took place; coordinated with the Engineer of Record. Pines Boulevard (SR -820) and 1.75 (SR -93) Bridge Deck Repair, Local Agency Program (LAP) Project, Pembroke Pines, Fl — City of Pembroke Pines Reference: Mr. Joe McLaughlin, PE (954) 435 -6511; Mr. John Danielson, PE, FOOT District 4 - Senior Project Engineer — Mr. Romano was responsible for overseeing the demolition and reconstruction of the concrete bridge deck, the final placement, casting, curing, and the final surface acceptance of the new concrete overlay deck as well as the supervision of all construction inspectors on this job. He monitored the extensive coordination and MOT set -up that was required on 1 -75 during the Pines Blvd. bridge deck demolition operations. Mr. Romano oversaw the removal and demolition of the existing concrete bridge deck to a depth of 3.5' or % below the top mat of reinforcing steel as well as the sandblasting of all exposed reinforcing steel members of all rust and corrosion, oil, and dirt. He managed the review of existing steel mats for possible steel deterioration, and verified the re- installlsplice of new reinforcing steel as necessary. District 4 Cost/Fees Paid:$ 163, 938.94 Construction cost: $437,835.78 r� LJ RFQ No. 14 -07 -02 1 Page 13.21 JASMANI RIVERON, PE EDUCATION M.S. Civil Engineering, Florida International University, College of Engineering, Miami, 2009 B. S. Civil Engineering, Florida International University, Miami, Florida, August 2008 YEARS OF EXPERIENCE YEARS WITH RJ BEHAR 5 Years 2010 - Present PROFESSIONAL REGISTRATIONS P. E. Florida License No. No. 73798, 2011 ENGINEERING EXPERIENCE Mr. Riveron has four years of experience in civil engineering, permitting, budgeting and construction management. He has worked on a 10 story commercial office building, applying for gold LEED certification, oversaw the completion of the project within budget and without scheduling constraints and coordinated the activities of the construction team, architects, engineers and vendors. He has assisted in scheduling and obtaining bids for numerous construction projects, obtained permits and legal documents for various developments. RELEVANT EXPERIENCE SR- 710/Beeline Highway Passing Lane Improvements from Okeechobee County Line to Allapattah Road, Marlin County, FL - Florida Department of Transportation District 4 Project Engineer responsible for preparing the concept plans, provided preliminary quantities, and cost estimates. He also reviewed the Design/Build team's proposals and attended ATC meetings. SR -A1A Bridge /Carlin Park Rehabilitation/Replacement, Palm Beach County, FL - Palm Beach County Department of Engineering & Public Works Division of Roadway Production Project Engineer responsible for roadway, signing and marking, drainage plans and permitting for the project. RJ Behar developed the design for the new bridge replacement with a new bridge similar to the existing bridge (span = 15) with similar substructure consisting of piles and sheeting. The design will include design of wing walls for each quadrant, preferably adjacent to the back of sidewalk in order to reduce construction impacts within the sensitive coastal environment. The roadway design will include the necessary approach modification to the new bridge. Kirk Road Bridge over LWWD L -9 Canal, Palm Beach County, FL - Palm Beach County Department of Engineering & Public Works Division of Roadway Production Project Engineer responsible for roadway, signing and marking, drainage plans and permitting for the project. The project will include replacement of the existing bridge with the installation of 80' of a 12' x 4.5' box culvert and canal revetment at both ends. The proposed drainage will continue to use the existing outfall's pipe sizes. SR-973/Galloway Road/NW 871, Avenue, Miami -Dade County, Florida — FDOT District 6 Project Engineer — He updated the NW 871, Avenue Bridge Hydraulic Report using the HEC -RAS model. The update consisted of updating the bridge geometry in the hydraulics model, the scour calculations and the final report. Northlake Boulevard Water and Sewer - City of West Palm Beach Palm Beach County Department of Engineering & Public Works Division of Roadway Production Project Engineer responsible for preparing the water and sewer plans for the City of West Palm Beach. As part of the project, RJ Behar designed the relocation of 1,310 feet of 20 inch water main and 1,299 feet of 16 inch force main. The new water main and force main will be relocated on the new bridge. RJ Behar prepared all the details and structural design to accommodate the new utilities on the bridge Hatton Highway Bridge over PDD Main Canal - Palm Beach County, Florida Palm Beach County Department of Engineering & Public Works Division of Roadway Production Roadway Engineer — He is responsible for preparing the roadway improvement plans, drainage design plans, and permitting. The bridge cross section is anticipated to include two 12' lanes with 8' shoulders, concrete barriers and no provision for sidewalks. Wing Walls and slope protection will be designed to accommodate the new bridge, highway alignment and typical section. Northlake Boulevard Bridge over the Loxahatchee Slough, Palm Beach County, Florida Palm Beach County Department of Engineering & Public Works Division of Roadway Production is- ).Behar RFQ No. 14 -07 -02 1 Page 13.22 JASMANI RIVERON. PE Project Engineer — He performed utility coordination, quantities and plans preparation. The scope of the project consisted of construction of a new bridge over the Loxahatchee Slough. The project partially meets some of the goals of the Comprehensive Everglades Restoration Project. Services included bridge design, drainage design, roadway improvements, permitting. SR- 645/Powerfine Road, Palm Beach County, Florida — FOOT District 4 Project Engineer — He attended project meetings and performed post design services for the project. The project consisted of the resurfacing of 3 miles of Powedine Road in Palm Beach County. This project involved preparing the Resurface, Restoration and Rehabilitation (RRR) Report. The project included a safety analysis and a signal assessment analysis. He has attended project meetings and is performing post design services for the project. Reconstruction of SE 316 Street, Belle Glade, Florida — FOOT, District 4 Project Engineer — He was responsible for the production of roadway plans, utility coordination, signing and pavement marking plans as well as quantities. The scope of this project included roadway plans, drainage design, signing and marking plans and utility relocation plans. The design included the use of filter fabric and a thick sub -base in lieu of demucking the roadway. The project also included water and sewer plans to be constructed as part of the roadway improvements. I-75/Griffin Road Interchange, Broward County, Florida — FOOT District 4 Project Engineer— He was responsible for plans preparation, utility coordination, pavement design and quantities. The scope of the project included roadway improvements, drainage, permitting, bridge, structural, signing and pavement markings, signalization, lighting, landscaping and traffic analysis. SR- AIIAIOcean Avenue, Martin County, Florida - FOOT District 4 Project Engineer who prepared the maintenance of traffic plans. The project scope included signal improvement design, construction maintenance of traffic, lighting design and plans preparation. SR- 7611(anner Highway, Martin County, Florida - FOOT District 4 Project Engineer who prepared the maintenance of traffic plans. The project scope included signal improvement design, construction maintenance of traffic, lighting design and plans preparation. SR- 601201^ Street RRR (West of 66th Avenue to 5P Avenue), Vero Beach, FL - FOOT District 4 ® Project Engineer — He was responsible for the maintenance of traffic plans and utility coordination. The scope of this project consists of engineering design services for the Resurfacing Restoration and Rehabilitation of SR-60; scope included utility coordination, lighting and signal plans. SR- 801Southern Boulevard PDBE Study, Palm Beach County, FL - FOOT District 4 Project Engineer — He assisted with the plans preparation for the Build Alternative No. 2 including development of preliminary design for the widening from the existing four lane facility to six lanes from Lion Country Safari to Forest Hill Blvd with an offset alignment. The design included the development of signing and marking with incorporation of all traffic operational modifications. Design included modifications to four traffic signals, installation of new transit stops and a separate multi-use path. The scope of this project involved the Contamination Screening Evaluation Report to determine potential adverse effects associated with the widening. Palmetto Greenways, Palm Beach County, FL - City of Boynton Beach, Florida He was responsible for the permitting on this project. TRAFFIC ENGINEERING EXPERIENCE SR-817/University Drive at Southgate Boulevard Review of Safety Study, Broward County, FL - FOOT District 4 Project Engineer responsible for reviewing the safety study and supply comments to the District. SR- 842Broward Boulevard from SW/NW 9th Avenue to Railroad Crossing Review of Safety Study, Broward County, FL - FOOT District 4 Project Engineer responsible for reviewing the safety study and supply comments to the District. SR- 8221Sheridan Street from 291^ Avenue to the 1.95 Interchange Review of Safety Study, Broward County, FL - FDOT District 4 Project Engineer responsible for reviewing the safety study and supply comments to the District. Origin Destination Surveys for Local Bus Routes — Miami -Dade County Metropolitan Planning Organization Data Collection — He performed on -board transit surveys along 22 Miami -Dade Transit bus routes for a transit ridership study. 11 RR.J.Behar RFQ No. 14-07-021 Page 1 3.23 YULET MIGUEL, PE CIVIL ENGINEERING EDUCATION B.S. Civil Engineering, Florida International University, 2009 YEARS OF EXPERIENCE YEARS WITH RJ BEHAR 7 Years 2013 - Present PROFESSIONAL SOCIETIES • ASCE, VP Student Affairs • SHPE, Member PROFESSIONAL REGISTRATIONS P. E. Florida License No. 7702812013 ENGINEERING EXPERIENCE Ms. Miguel has seven years of experience working on range of civil engineering projects. At RJ Behar, she is responsible for support in the areas of design and permitting for multiple projects. These projects range from municipal to federal, with job duties including site and drainage design, plan revisions, and utility and project coordination. RELEVANT EXPERIENCE Design Services for Lehman Causeway Wall, Sunny Isles Beach FISunny Isles Beach Project Engineer — She assisted in the design of the privacy wall, she coordinated with the Utility companies, and assisted in the RFI Reviews. — Scope of the project was to design an 8 -ft privacy wall, approximately 1,800 LF in length within FOOT right -of way below the William legman causeway near Collins Avenue, US-1/SR-5/Biscayne Boulevard Resurfacing from NE 199th Street to NW 213th Street, Miami -Dade County - FOOT D6 Project Engineer — She was responsible for the production of roadway plans, signing and pavement marking plans and signal plans in accordance with the FDOT's PPM and latest design standards. She also assisted with field visits, sign inventory, utility Coordination process and project quantities. The scope of work includes milling and resurfacing, pavement widening, median reconstruction, upgrading pedestrian facilities to comply with ADA requirements, signing and pavement markings, bike lane designations, and providing signalization and operational improvements at the intersections. US -1 Lateral Ditch Restoration, Indian River County, FL — FOOT District 4 Project Engineer — She is responsible for the preparation of Lateral Ditch System Plans, profile, Cross sections, quantities, SWPP and temporary maintenance of traffic (MOT) Plans. The purpose of this project is to analyze the existing drainage conditions and re- establish or improve the original design section for each ditch with the goal of restoring adequate drainage along US-1. US- 11SR- 5Biscayne Boulevard from N of NE 121$1 Street to NE 151$1 Street, Miami -Dade County - FOOT D6 Project Engineer - She was responsible for the preparation of roadway plans, signing and pavement marking plans; developed quantities and assisted in the final preparation and submittal of the project and assisted in the assembly of the Computation book and supporting documents.. The scope of services includes milling and resurfacing, signing and pavement markings, traffic control plans and ADA and pedestrian features upgrades. DesignBuild - SW 196th Avenue /Pembroke Road, Broward County, Florida — City of Pembroke Pines Project Engineer — She is responsible for preparing roadway plans, signing and pavement markings, and coordination with the City of Pembroke Pines and Broward County for plans permitting and approvals. Design/Build of SW 207th Terrace/SW 54th Place, Broward County, FL — City of Pembroke Pines Project Engineer responsible for the roadway plans. The new two-lane, two -way roadway will run from SW 2071t to SW 20P Avenue. SR- 99711(rome AveJSW 177th Avenue from SR- 51US -1 to SW 29Th Street, Miami -Dade County, FL — FOOT District 6 Project Engineer — She was responsible for the preparation of roadway, signing and pavement marking plans as per the PPM Volume 2 and the current edition of the FDOT Design Standards. This project consisted of milling and resurfacing, as well as, upgrading existing ramps and sidewalks to be ADA complaint and correcting cross slope deficiencies. This was a Rehabilitation, Resurfacing and Restoration project (RRR NW 2711 Avenue from NW 122nd Street to NW 135th Street, Miami -Dade County, FL — FOOT District 6 Project Engineer — She was responsible for creating the roadway, signing and pavement markings and signalization plans. This project was an urban divided six lane highway with sidewalk and curb and gutter on each side. The project consisted of milling and resurfacing, sidewalk and curb and gutter repairs, reconstructing existing non -ADA compliant ramps and WR.J.Behar RFO No. 14-07-021 Page 13.24 YULET MIGUEL. PE sidewalks, minor drainage improvements and widening a left turn lane. She was responsible for coordination with the ® County and utilities for major improvements to upgrade pedestrian countdown signal heads, pedestrian detectors and new pull boxes and signal loops. She was involved in the public information meeting and preconstruction meetings. SW 192nd StreetlGrossman Farm Road from SW 1979, Avenue to SR 9971 Krome Avenue /SW 1771^ Avenue, Miami, Florida — FDOT District 6 Project Engineer — She was responsible for the roadway and signing marking plans for this rural unsignalized intersection safety improvement project. The project included new paved shoulders, recapping existing pavement markings, adding new drainage to eliminate water ponding at the intersections, and upgrading guardrail end treatments. She was also responsible for the coordination and design of the installation of two new solar powered flashing beacons with advisory speed signs to improve safety at the intersection of SW 197LI Avenue. Neighborhood No. 2/North Shore — Indian Creek Drive from Abbott Avenue to 7151 Street FDOT ARRA, Miami Beach, FL — City of Miami Beach Public Works Project Engineer — She was responsible for the preparation of the roadway, signing and pavement markings, and signalization plans for this federally funded ARRA project. This was an undivided corridor which included milling and resurfacing, new ADA compliant ramps with brick paved crosswalks and a new signalization on NW 692, Street and Indian Creek Drive. In addition, there were signal countdowns installed and pedestrian detectors. Design -Build ARRA, Miami Lakes, Florida — Town of Miami Lakes Project Engineer — Her responsibilities included the preparation of the roadway, signing and pavement marking plans for this federally funded ARRA project. This project consisted of milling and resurfacing, minor reconstruction, sidewalk repairs, and curb ramp upgrades. She also assisted in the preparation of the project's drainage plans and Maintenance of Traffic (MOT) plans. Miami River Greenway from SW 151 Court to South Miami Avenue, Miami -Dade County, Florida — City of Miami, Capital Improvement Projects Project Engineer — She was responsible for site visits, initial engineering review, the production of roadway, signing and pavement marking plans and the implementation of the Miami River Greenways Master Plan. This included widening the existing 5.6 fool sidewalk to an 8 fool shared use path. Benches and amenities were placed along this corridor as part of ® the master plan along with a decorative sidewalk and landscaping. She was the main utility coordinator for the project in order to relocate or adjust existing utilities along the project corridor. The Project also included a signing component of way finding signs along the project corridor to inform pedestrians about the Miami River Greenways Project and direct them towards the pathway Miami River Greenway from NW N. Miami Avenue from NW 51h Street to NW 6th Street, Miami -Dade County, Florida — City of Miami, Capital Improvement Projects Project Engineer — She was responsible for site visits, initial engineering review, the production of roadway, signing and pavement marking plans. This included widening the existing 5-6 foot sidewalk to an 8 foot shared use path. Benches and amenities were placed along this corridor as part of the master plan along with a decorative sidewalk and landscaping. She was the main utility coordinator for the project in order to relocate or adjust existing utilities along the project corridor. The Project also includes a signing component of way finding signs along the project corridor to inform pedestrians about the Miami River Greenways Project and direct them towards the pathway. She also had close coordination with the landscape architect, which was also an essential role in this project. SW 18th Terrace, SW 2314 Road, SW 2P Road, and SW 22nd Road Between 51" and 11th street, Roadway Improvements Project, Miami -Dade County, FL— City of Miami, Capital Improvement Projects Project Engineer — She was responsible for site visits, initial engineering review, the production of roadway, signing and pavement marking plans, temporary traffic control plans, SWPP plans, generating quantities, and the utility coordination. This project consisted of reconstructing minor sections of the roadway to achieve the correct runoff slope and reconstructing the gutter to ensure proper flow line movement to the existing drainage system. She assisted in minor drainage improvements and acquiring permits for this project. SW 56N Avenue and SW 2nd Street and SW 5314 Avenue and SW 41' Street Traffic Calming Improvements, Miami - Dade County, FL — City of Miami, Capital Improvement Projects Project Engineer — She was responsible for site visits, initial engineering review, the production of roadway, signing and pavement marking plans, temporary traffic control plans, SWPP plans, generating quantities, and the utility coordination. The scope was to design traffic calming inland to improve the intersection design. She assisted in the roadway design, calculations, pavement design, quantities, and plan assembly. R.J.Behar RFO No. 14 -07 -021 Page 13.25 PAOLA RIVEROS- PE EDUCATION B. S. Civil Engineering, Florida International University; Miami, Florida, 2001 YEARS OF EXPERIENCE 13 Years PROFESSIONAL REGISTRATIONS P. E. Florida License No. 7424912012 PE Washington, DC No. 90576912010 ENGINEERING EXPERIENCE YEARS WITH RJ BEHAR 2001 - Present PROFESSIONAL SOCIETIES • American Association of Civil Engineers • Association of General Contractors Ms. Riveros has been responsible for the preparation of roadway plans, drainage plans and site plans throughout South Florida. She has assisted in drainage design of stormwater management projects as well as roadway design. She has also performed construction cost estimates for improvements that included street construction, buildings construction, and landscaping projects. Ms. Riveros is well -versed in the use of AdICPR, ASAD, and HEC -RAS for stormwater and hydraulics design and of Geopack software for roadway design and electronic delivery of FDOT plans. Her responsibilities have included the preparation of drawings in MicroStation and AutoCAD for civil and roadway projects. At RJ Behar, Ms. Riveros is responsible for support in drainage and permitting projects. She has drafted and performed revisions to site, utility, drainage, and landscaped plans. Ms. Riveros has more than eleven years of experience. She has managed the production of and coordinated with other junior engineers and technicians on several FDOT projects. RELEVANT EXPERIENCE Temporary On-Site Staffing, Florida Department of Transportation District 4, Ft. Lauderdale, Florida Project Manager - She serves as project manager for assigned projects, tracks project commitments and ensures that they are met; takes proactive lead to anticipate problem areas and seeks the resolution, so commitment dates are not impacted; updates and reviews schedules, participate in project scoping, LRE updates, ensures the integrity of the schedules, and coordination of any changes with the affected departments. She ensures that the consultants are providing the highest quality product consistent with Department Standards, criteria and process; provides technical support to consultants; ensures completion of all critical activities with accompanying approvals by the reviewing section per the approved schedule; reviews and approves progress reports for assigned projects; coordinates with support sections, FHWA, local and permitting agencies to ensure that all the project concerns are addressed and any conflicts are resolved. She is managing design as well as PDBE projects. Design/Build 1.595 Final Design, Broward County, Florida — FOOT District 4 (Subconsultant to AECOM /Dragados) Project Engineer involved with the drainage design for several sections of the corridor. Design tasks included exfiltration trench design, storm sewer design and analysis, and both wet and dry retention/detention stormwater management pond designs. She was involved in the drainage design of two segments of the Turnpike roadway. Also performed plan modifications after RFC plans were issued and directed the plans preparation with other designers and technicians. The design involved the use of spreadsheets, AdICPR, ASAD and Microstation. Project length: 10.5 miles Andrews Avenue, Broward County, Florida — FDOT District 4 Project Engineer for the preparation of the pond siting report and design of the stormwater management system. She also performed the nutrient analysis for removal of phosphorous and nitrogen loads. SR -A1A Resurfacing Project, Palm Beach County, Florida — FDOT District 4 Project Designer for this RRR project from the Boynton Inlet Bridge to SR -802. The project included milling and resurfacing for 4 miles and reconstruction of 1 mile of a major rural roadway, as well as drainage improvements, coastal drainage studies, pavement marking and signing, overhead signing plans, lighting plans, three signal locations, bridge plans, wetland mitigation, public involvement, design documentation and landscape plans. She prepared all the roadway plans and performed the AdICPR drainage modeling of existing and proposed conditions. Project Length: 5 miles SR- 51US -1 Resurfacing, Boca Raton, Florida — FDOT District 4 Project Engineer for the milling and resurfacing the existing pavement; upgrade to signal systems, upgrade of ADA facilities. The scope also included new signing and pavement markings and upgrading landscaping. Project Length: 1.4 miles WR.J.Behar RFQ No. 14-07-021 Page 13.26 PAOLA RIVER0S. P Powerline Road (SR -845) Palm Beach County, Florida — FDOT District 4 ® Project Engineer in charge of the project's design. The project included milling and resurfacing of 3 miles of a major collector, 8 signal upgrades, safety improvements and miscellaneous drainage improvements. NW 87w Avenue (SR-973/Galloway Road) Miami -Dade Co., Florida — FDOT District 6 Project Engineer who assisted with the preparation of drainage plans for new construction of a major arterial. The scope includes final design and future new construction, roadway design, traffic operations, drainage, structure and construction. Project Length: 1.90 miles Hollywood Boulevard (SR -820) from SR -A1A to US -1 — FDOT District 4 Project Engineer for the preparation of drainage plans, including coordination with utilities. Southern Boulevard (SR -80) Drainage Design — FDOT District 4 Project Engineer — She performed drainage area calculations and input data into the AdICPR stormwater model. She also performed floodplain volume compensation calculations. Blue Heron Boulevard — FDOT District 4 Drainage Designer responsible for the preparation of drainage plans for a 3R project. Alton Road (SR -907) — FDOT District 6 Project Engineer who prepared the roadway plans for 4 miles of a 3R project as well as drainage structure sheets and details. The project included injection wells and pump stations. US-1 (Federal Highway) Hallandale Beach, Florida — FDOT District 4 Project Designer — The RRR project went from the County Line to Hallandale Beach Boulevard. This project included the design of 0.8 miles of a six -lane urban divided highway as well as minor drainage Improvements. Kings Highway (SR -713) Resurfacing — FDOT District 4 Project Engineer who assisted in the preparation of the 3R report. She prepared the Summary of Crash Analysis. SW 62^" Court — Town of Southwest Ranches, Florida Project Engineer for preparation of the roadway reconstruction plans and drainage plans. North County Neighborhood Improvement Project — Broward County, Florida Project Engineer in charge of drainage design and permitting. She performed design of French drains, stormsewer systems ® and prepared the drainage plans and report. NE 151^ Avenue — City of Fort Lauderdale, Florida Project Engineer — She was responsible for the master plan for a 0.8 mile roadway in Fort Lauderdale, Florida. The project included resurfacing plans, marking and signing plans, and landscape plans. NW/NE 131h Street — City of Fort Lauderdale, Florida Project Engineer — She was responsible for the master plan for a 2.1 mile roadway in Fort Lauderdale, Florida. The project included resurfacing plans, marking and signing plans, and landscape plans. W. 771^ Street — City of Hialeah, Florida Project Engineer for the preparation of roadway reconstruction plans and drainage plans. W. 3r Street — City of Hialeah, Florida Project Engineer for the preparation of roadway reconstruction plans and drainage plans. W. 3311d Street Phases I and II — City of Hialeah, Florida Project Engineer for the preparation of roadway reconstruction plans and drainage plans. W. 74d, Street — City of Hialeah, Florida Project Engineer for the preparation of roadway reconstruction plans and drainage plans. E.181^ Street, E. 91^ Street and Curtis Drive — City of Hialeah, Florida Project Engineer for the preparation of for the preparation of roadway reconstruction plans and drainage plans. W. 7t1 Avenue M. 76th Street M. 75r^ Street — City of Hialeah, Florida Project Engineer for preparation of roadway plans for city street improvements. Palm Avenue Final Design from Okeechobee Road to 21m Street — City of Hialeah, Florida Project Engineer for preparation of construction drawings for roadway reconstruction and improvements on Palm Avenue. Ansin Boulevard — City of Hallandale Beach, Florida Project Engineer for the reconstruction of one mile of City streets. She also designed the drainage systems. 11 ItR.).Behar RFQ No. 14 -07 -02 1 Page 13.27 ELMER CARDENAS, PE DRAINAGE DESIGN /WATER AND SEWER EDUCATION M.S. Environmental Engineering, Florida Intemational University, 2001 B.S. Civil Engineering, National University of Engineering, Lima, Peru, 1984 YEARS OF EXPERIENCE YEARS WITH RJ BEHAR 30 Years 2014 — Present 2001 -2004 OFFICE LOCATION Pembroke Pines, Florida PROFESSIONAL REGISTRATIONS Professional Engineer Florida License No. 62988, 2005 ENGINEERING EXPERIENCE Mr. Cardenas has 30 years of engineering experience. Mr. Cardenas is responsible for design and plans preparation for civil engineering and water resource projects. He has extensive experience in environmental engineering and utility projects and has designed and supervised Construction of water distribution systems and drinking wells. He has experience with the use of Environmental models: SWMM (storm water management model), and HSSM (hydrocarbon spill screening model) and hydraulic models AdlCPR, ASAD and HEC -RAS. RELEVANT EXPERIENCE CR- 7121Midway Road from west of 2P Street (CR 615) to east of US- 11SR -5, St. Lucie County - Florida Department of Transportation, District 4 Project Engineer — He worked on the drainage design revisions for final plans, updated the AdICPR models for 5 ponds, and designed cutverting of Merrit's Ditch and several outfalls. Company: R.J. Behar & Company, Inc. (2014 — Present) SR- 8361SR- 1121Miami Intermodal Center (MIC) Interconnector Project Engineer — He evaluated of the existing drainage system designed by MIC Management Group and performed analysis of the proposed drainage system (the MIC design as existing). The proposed interchange included: the Interoonnector from SR-836 south to SR -112 in the north, access ramps from Central Boulevard to Le Jeune Road northbound and access ramp from Le Jeune Road southbound to SR -836. Company: R.J. Behar & Company, Inc. (2001 — 2004) 1 -95 HOV - FDOT District 4 - Palm Beach County Project Engineer — He provided quality control review of drainage design for two separate 1 -95 HOV design contracts. Company: R.J. Behar & Company, Inc. (2001 — 2004) Stormwater Master Plan — Dolphin Expressway SR 836 Project Engineer — He provided quality control review of the SR 836 expansion program stormwater master plan. Company: R.J. Behar & Company, Inc. (2001 — 2004) Area west of US -1 Drainage Study — City of Hallandale Beach Project Engineer — He performed hydraulic analysis of the 14" Avenue canal using the HEC -RAS computer model. Company: R.J. Behar & Company, Inc. (2001 — 2004) Stormwater Master Plan — Don Shula Expressway SR 874 He performed data collection and prepared the drainage maps for the master drainage system. Company: R.J. Behar & Company, Inc. (2001 — 2004) West 771^ Street City of Hialeah Project Engineer — He prepared the drainage design and Environmental Resource Permit (ERP) application. Project included new outfall to the Red Road canal. Company: R.J. Behar & Company, Inc. (2001 — 2004) Palm Avenue Phase II City of Hialeah He prepared of drainage design, report and Environmental Resource Permit (ERP) application. Company: R.J. Behar & Company, Inc. (2001 — 2004) R.J.Behar RFQ No. 14 -07 -02 1 Page 13.28 ELN1ER CARDENAS. PE Hallandale Beach Boulevard, Broward County - Florida Department of Transportation FDOT D4 Project Engineer— He performed hydraulic and hydrology calculations and prepared the drainage report for the drainage design of Hallandale Beach Boulevard from NW 581, Avenue to SW 32^d Avenue, including French Drain design to provide water quality. Company: HBC Engineering 1.595 Express Corridor Improvements Project, Florida Department of Transportation - DRAGADOS USA Project Engineer — He revised and updated as -built plans for drainage components, according to modifications to roadway and drainage designs and RFIs. Project includes seven zones along 1 -595 and SR 84 (eastbound and westbound) from east of 1 -75 to west of 1 -95. Company: HBC Engineering SR 823M 571^ Avenue Reconstruction from South of West 541" Street to South of West 841^ Street, Miami -Dade County - Florida Department of Transportation FDOT D6 Project Engineer involved in the preparation of signalization component plans for all signalized intersection of the reconstruction project. Company: CH Perez & Associates Consulting SR 82 SR 823M 5711 Avenue Reconstruction from South of West 541^ Street to South of West of SO Street, Florida Department of Transportation FDOT D6 Engineer - He was in charge of quality control for the drainage components of this project. Project included triple 72' pipe culvers, water quality provided for French Drains, special control structures placed before runoff is discharged to Red Road canal. Company: CH Perez & Associates Consulting SR 9341E 25 StreetINW 79 Street Milling and Resurfacing project from West of E 51^ Avenue to NW 2800 Block, Miami -Dade County, Florida Department of Transportation FDOT D6 Project Engineer involved in the preparation of roadway construction plans and signing and pavement marking design. Company: CH Perez & Associates Consulting SR 9441NW 54 StreetfHialeah Drive Milling and Resurfacing project from E 10'" Avenue to NW 70, Avenue, Miami - Dade County - Florida Department of Transportation FDOT D6 Project Engineer involved in the preparation of signing plans. Drainage Assessment of SR 8231NW 57 Avenue for Scoping Report - Florida Transportation Engineering Project Engineer — He performed an evaluation of exiting drainage systems of SR 823NW 57 Avenue from MP 4.754 to MP 7.747. Drainage report including improvement recommendations and estimated construction cost. Company: Independent Consultant Plans Review of SR 9971Krome Avenue - Ribbeck Engineering Project Engineer — He reviewed the 60% submittal of Roadway Plans — Drainage components of SR 99711(rome Avenue from MP 17.010 to MP 1.145. Company: Independent Consultant SR -15IUS -441 from 5t^ Street (W. Martin Luther King Jr. Blvd.) to SR 700, 3R Project — Florida Department of Transportation District 4 Roadway and drainage engineer in charge of pavement design, preparation of documents for design exceptions and variations, and drainage evaluation for resurfacing, restoration and rehabilitation of 4 miles segment of SR 15 in the Pahokee area, Palm Beach County. Company: HNTB Corporation Bridge of the Isles — 30% of Design Build Project - Florida Department of Transportation District 4 Roadway and drainage engineer in charge of roadway design, pavement design, preparation of documents for design exceptions and variations, and drainage design for the replacement of five bridges: Fiesta Way, Isle of Venice, Royal Palm Drive, Nurmi Drive over Las Olas Canal and Sunrise Key Boulevard over Karen Canal in Fort Lauderdale, Broward County. Company: HNTB Corporation Widen Florida's Turnpike — HEFTISR -821 from 2161h Street to North of 164"' Street - Florida Turnpike Enterprise Drainage Engineer — He was in charge of the design of the drainage systems, culvert extensions and water quality calculations for the widening and reconstruction of 3 miles of SR-821 in Miami -Dade County. Company: HNTB Corporation 1% R.).Behar RFQ No. 14-07-021 Page 13.29 HANS MURZj, PE EDUCATION M.S., Environmental Engineering, Florida International University, 2002 B.S., Chemical Engineering, University of Los Andes, Merida, Venezuela, 2000 YEARS OF EXPERIENCE 12 Years PROFESSIONAL REGISTRATIONS P. E. Florida License No. 67767.2008 YEARS WITH RJ BEHAR 2014 — Present PROFESSIONAL SOCIETIES • Tao Chi Alpha — Environmental Engineers Honor Society • Water Environment Federation • American Society of Civil Engineers ENGINEERING EXPERIENCE Mr. Murzi is a water resources engineer with twelve years of experience including hydrologic and hydraulic analysis and modeling of rivers and flood control systems, natural resources restoration projects, and watershed management. Also, rural and roadway drainage design, drainage field inspections, drainage plan reviews. The experience includes use of several computer programs such as XPSWMM, HEC -RAS, AdICPR, MIKE SHEIMIKE 11, ASAD, ArcGIS. RELEVANT EXPERIENCE SR- 9731NW 8r Avenue /Galloway Road, Miami -Dade County, Florida — FDOT District 6 Project engineer responsible for revisions to the drainage design. SR -50 Project, Orlando, Florida — FOOT District 5 Project engineer responsible for optimizing the preliminary drainage design in ASAD of basins 1, 2, and 3 of SR -50, and the modeling the proposed conditions in AdICPR. I-4 Ultimate Project, Orlando, Florida — FDOT District 5 Deputy Drainage Lead for the Central Segment of the 1-4 ultimate conceptual drainage design. The 1-4 Ultimate Project is over 21 miles from West of Kirkman Road to West of SR 434; it will include 56 new bridges, 71 bridge replacements, and reconstruction of 15 major interchanges. Naples Beach Outfalls Hydrologic and Hydraulic Modeling — City of Naples, Florida Lead modeler in XP -SWMM of the existing conditions and different potential alternatives to eliminate the City of Naples Beach outfalls. Project is located within Basin 11, with an approximate contributing area of 395 acres. Sarasota County Watershed Model Maintenance and GIS Update Lemon Bay Model — Sarasota County, Florida Project Engineer responsible to update the Lemon Bay watershed model. The Lemon Bay AdICPR Model was updated to incorporate the as -built conditions of new subdivisions. The Sarasota County GIS database was updated based on the revisions made to the model along with development of 100 year 24 hr floodplain delineation maps. Florida Fish and Wildlife Conservation Commission — FWC, USA Fodderstack Slough Weir Project. Project engineer assisting in the HEC -RAS modeling of the Fodderstack Slough Weir, located at the Lake Marian outlet and Fodderstack Slough. Garage Building Miami, Florida — Florida Department of Health Drainage engineer for the design and Construction of the drainage system. The Garage was constructed on the existing parking lot the Department of Health; the drainage design consisted on modifying the existing drainage and design of the new drainage to serve the new garage. Kingdom of Saudi Arabia, Jeddah Stormwater Drainage Program, Southern Channel Outfall, Jeddah, Saudi Arabia Project engineer for design of the southern channel outfall, a drainage channel in the southeastern portion of the city carrying runoff southwest towards the Red Sea. The project consisted on improvements needed to increase the capacity of the channel to convey the 100 -year storm event. The project comprises rehabilitation to the existing channel for approximately seven miles; construction of two detention basins of total area of approximately 990 acres; widening sections of the existing channel for approximately two miles; replacing one box culvert bridge and four bridges; demolish one service bridge and four pedestrian bridges; rehabilitation of existing sections of channel damaged as a result of the recent storm events or that have failed due to local conditions (including cleaning the existing channel and removal of debris). The channel was modeled in HEC -RAS. Broward County Floodplain Mapping Efforts — Broward CountyIFEMA, Florida Drainage Modeler responsible for managing the overall aspects of the project that included data Collection and WR.J.Behar RFQ No. 14 -07 -021 Page 13.30 HANS MURZI, PE development, GIS data acquisition and analysis, modeling, and development of the final report. The project area ® encompasses the complete Broward County with some portions of Dade County on the north and Palm Beach County on the south. Scope of services included modification of MIKE SHE/MIKE 11 model for the entire Broward County with new LIDAR based DEM and new Land Use data, calibration and verification of the model using known Hurricane storm events by modifying Structure/Gate openings, Tidal boundaries and Boundary Conditions, simulating the calibrated model for several design storm event scenarios and development of final report. North New River Hydraulic modeling, 1-595 Corridor Improvements, Fort Lauderdale, Florida — FDOT District 4 Project engineer assisting in the HEC -RAS modeling of the North New River Canal (NNRC). The NNRC Basin covers an area of about 19,000 acres in eastern Broward County. The NNRC provides flood protection and drainage for the NNRC Basin, and water supply to the basin during periods of low natural flow. The NNRC was modeled for the existing conditions, and calibrated against historical storms, and then several scenarios were modeled to analyze different alternatives to keep the channel capacity due to the SR-84 expansion that required filling of a portion of the channel. More than 14 miles of channel were modeled in HEC -RAS. 1.595 Corridor Improvements, Fort Lauderdale, Florida — FDOT District 4 Deputy Drainage Lead for the drainage design of 14 miles of corridor improvements. This project is a Public Private Partnership between the Florida of Transportation and ACS Group. The construction value is $1.362 Billion and is expected to be completed by summer 2014. The project covers 14 miles of roadway improvements along 1.595 and a portion of Florida's Turnpike. The improvements include the addition of 3 reversible tolled express lanes, widening of the six lane Interstate, reconstruction of the four lane divided arterial (SR -84), 68 bridge structures, and improvements to the North New River Canal. Key design components include 8 braided ramp structures, directional connectors between the express lanes and Florida's Turnpike and improvements to three major interchanges. Development/Redevelopment Plan Conformance, Broward County, Florida — CBWCD Project engineer for review of plats, paving and drainage plans, as -built drawings, and all drainage related reports for all developments and redevelopments for conformance with the regulation, standards, procedures and design criteria of the CBWCD. Processing an average of 70 plans annually, including Griffin Road Expansion; and the Turnpike Expressway expansion from Johnson Street to 1 -595; CBWCD covers a 43.5- square -mile area that includes unincorporated Broward ® County Cooper City, the Seminole Indian Reservation; and communities of Davie, Hollywood, Sunrise, and Pembroke Pines. Provided services related to regulation, permitting, infrastructure improvements, and the operation and maintenance of more than 100 miles of secondary canals serving 150,000 residents. Participated in the annual revisions of the design criteria manual and conducted site inspections. Kissimmee Basin Hydrologic Assessment, Modeling, and Operations Planning, Florida — SFWMD Project engineer for an assessment of how existing operating criteria for the water control structures in the Kissimmee Basin can be modified to achieve a more acceptable balance among flood control, water supply, aquatic plant management, and natural resource water management objectives, while also balancing impacts across ecosystems including Lake Okeechobee and the estuaries. This project includes the implementation of an integrated surface-ground water model (MIKE SHE/MIKE 11), use of screening tools like OASIS, application of Heuristic Wrappers, development of performance measures, and development and application of performance measures evaluation tool. Eastern C -11 Basin Facilities Report Update, Central Broward County, Florida — CBWCD Lead modeler in facilities report update. Creating a 1500 -node XP -SWMM model to analyze the entire secondary canal system in the Eastern C-11 Basin. The C -11 flows from west to east during flood conditions canal and is controlled at its eastern border by Structure S -13, which separates the portion of the canal that is subject to tide. Stage - storage and infiltration parameters were estimated based on GIS information. Flooding areas are to be identified and its flooding problems alleviated through proposed control measures. C6 Basin, Stormwater Management Master Planning, Miami, Florida — Miami - Dade County, DERMProject engineer for development of a stormwater management master plan, which will identify the main water quantity and quality problems and will implement strategies for reducing existing impacts. The plan will estimate the effects of existing and future Ianduses on flood protection and water quality, and identify infrastructure and management strategies to accommodate those uses. Assisted in the data collection, data manipulation, AutoCAD drawings, and GIS related tasks. Department of Environmental Resources Management, Federal Emergency Management Agency DORM, Miami, Fl Project engineer for drainage design of a 2- square -mile section of Miami's Westchester area. Project is funded by FEMA due to major flooding in the area. Proposed drainage improvements include the design of exfiltrafion trenches to meet the five -year stormwater quality criteria set by DERM. Performed design calculations, review of as -built drawings, prepared ® AutoCAD designs, cost estimates, reports, bid documents, and assembled packages. WR.J.Behar RFO No. 14-07-021 Page 13.31 ROHAN PUNIT, El CIVIL ENGINEERING EDUCATION M.S. Civil Engineering, University of Florida, May 2009 B.S. Civil Engineering with a Minor in Business Administration, University of Florida, May 2007 YEARS OF EXPERIENCE YEARS WITH RJ BEHAR 7 Years 2008 - Present PROFESSIONAL REGISTRATIONS E.I. Florida License No. No. 1100011628/2007 ENGINEERING EXPERIENCE Mr. Punit has been involved in the design process of industrial, residential, and commercial land development projects, in both the public and private sectors. He has assisted with the design of various stormwater systems, grading schemes, site plan designs and roadway projects. In addition to his land development experience, his construction field experience includes erosion and environmental control monitoring. Mr. Punit has used both AutoCAD and Microstation to aid in the design of numerous projects. At RJ Behar, he is responsible for support in the areas of design and permitting for multiple projects. These projects range from municipal to federal, with job duties including site and drainage design, plan revisions, and utility and project coordination. Mr. Punit has seven years of experience. RELEVANT EXPERIENCE ROADWAY AND DRAINAGE DESIGN EXPERIENCE SR- 5/Biscayne Boulevard from N of NE 121" Street to NE 151" Street, Miami -Dade County - FDOT D6 Project Engineer responsible for the design and permitting. The scope of services includes milling and resurfacing, signing and pavement markings, traffic control plans and ADA and pedestrian features upgrades and improved signalizabon configuration at SW 1351h Street. Miami River Greenways, Segment D — City of Miami, Florida Project Engineer — He assisted with the roadway design including drainage improvements, signing and marking, as well as lighting design. The project consists of the reconstruction of an existing roadway segment along the Miami River to produce a scenic, landscaped, pedeshian/bicyde walkway /greenway. The project includes the design of a drainage system with wells, decorative lighting and landscape/hardscape design. Project length: 1 mile NW 87d, Avenue (SR- 973 /Galloway Road) Miami -Dade County, Florida — FDOT, District 6 Project Engineer — He assisted with the roadway plans preparation and drainage plans. The scope consisted of new construction of NW 87t' Avenue (from NW 741, Street to NW 1031d Street) within the Town of Medley in Florida. Project length: 1.90 miles. SR- 5/US -1 /Overseas Highway from Fontaine Drive to S. of Tavernier Creek Bridge, Monroe County, Florida — FDOT, District 6 Project Engineer responsible for the design and permitting. The scope of services includes milling and resurfacing, signing and pavement markings, traffic control plans and ADA and pedestrian features upgrades. Enhanced traffic signal signage was required due to a high rate of accidents at the corridor's one signalized intersection. Additionally, the Typical Section was modified to accommodate bicycle lanes without widening. Length: 0.80 miles SR -7/US -441 Roadway Lighting and NW 111^ Place Pedestrian Lighting Improvements, City of Lauderhill, Florida — FDOT, District 4 LAP Project Project Engineer responsible for the design, quality assurance reviews of the plans, permitting and coordination with respective agencies. The scope of this project includes milling and resurfacing, installation of decorative stamped concrete and asphalt, lighting, landscaping, and street furniture. This is a FOOT Local Agency Program (LAP) Project. Project length: 0.45 miles NW 71^/91" Connector (Design) — Fort Lauderdale, Broward County, Florida RFQ No. 14 -07 -021 Page 13.32 ROHAN PUNIT. El Project Engineer for the design of a 1.5 mile new alignment urban roadway in Downtown Fort Lauderdale. The scope of this ® project includes signalization, drainage design, signing pavement, marking and permitting as well as public involvement coordination. Health Central Way — Oviedo, Florida Project Engineer — He assisted with the roadway and drainage plan designs for this addition to the Health Central Hospital Campus. Sarasota V.A. Cemetery — Sarasota, Florida Project Engineer — He prepared roadway widening, turn lanes and drainage plans. Lake Butler Professional Campus — Oviedo, Florida Project Engineer — He prepared the turn lane widening plans. The Landing at Lake Harris — Tavares, Florida Project Engineer — Responsible for the off -site roadway widening and drainage plans to accommodate the subdivision. Tumpike Widening — FDOT Turnpike Enterprise Officer Engineer (Internships) — Mr. Punit assisted in the on -going construction of the Turnpike Widening Project in coordination with the Florida Department of Transportation (FDOT). He maintained erosion control procedures, scheduled subcontractor work and was responsible for pay estimates as well as quantity tracking. He also assisted with scheduling and planning various project activities. SITE DESIGN EXPERIENCE BCIFAU A. Hugh Adams Parking Garage Expansion, Davie, Florida — Broward College Project Engineer — Responsible for plans preparation and permit coordination. Assisted with drainage design to ensure proper conveyance with the existing system. As this was a design -build project, coordination among the contractors, dients, and owners was key to the successful completion of this job. Constant contact was maintained with the contractors to ensure quids turnaround times on RFI's and shop drawings. Project length: Not applicable. Seawall Repairs — City of Pompano Beach, Florida Project Engineer — This project includes repairing existing seawalls for Hillsboro Inlet Park and Indian Mound Park in the ® City of Pompano Beach. Repairs include replacing existing concrete piles and pile caps, sealing cracks along the seawalls and backfilting areas of undermining near wall joints. RJ Behar utilized an existing conditions report generated by the City to produce construction documents for contractors. These documents included various options for repairing deficiencies within the walls. Devine Park — Town of Davie, Florida Project Engineer — The Town of Davie contracted RJ Behar to convert a portion of the Devine Estates tree nursery into an equestrian park. Site elements include multi-use pedestrian/equestrian trails, a gazebo overlooking the existing pond, design of a drainfield for the proposed bathrooms, horse trailing parking and staging area for patrons and enclosure of the remaining tree nursery with associated maintenance access. Permitting entities include the Town of Davie, Central Broward Water Control District and Broward County Health Department. Hialeah Public Works Site Plan — City of Hialeah, Florida Project Engineer responsible for the site remodeling, demolition and reconstruction phase of the City of Hialeah Water and Sewer Department Complex. The project includes extensive utility coordination to coincide with construction phasing for the project, new site layout, new exfiltration trench drainage system and design of new water and sewer facilities to service site. Palm Avenue (from W. 4511, Street to W. 471^ Street) — City of Hialeah, Florida Project Engineer — He assisted with the roadway improvement plans, milling and resurfacing, drainage, signing and pavement markings as well as lighting plans. The scope of this project consisted of roadway improvements, milling and resurfacing, drainage, signing and pavement markings and lighting plans, utility coordination and permitting with FDOT on Palm Avenue from West 4511 Street to West 47th Street in the City of Hialeah. This project is part of the American Recovery and Reinvestment Act (ARRA), which is supported by federal funds. The challenge of this project was to prepare roadway plans which would improve the roadway corridor while minimizing federal funds the City would have to use. Project length: 0.25 mile Shop 3C Fleet Maintenance Facility — Miami -Dade County, FL Project Engineer responsible for design, permitting, and construction administration services, ensuring proper coordination from design to project completion. The scope of the project includes drainage, dvil site amenities, and utility improvements for a new building addition and associated parking. QR.).Behar RFQ No. 14-07-021 Page 13.33 NANETTE AKYAZ EDUCATION A. A. Degree Broward Community College, Davie, Florida, 1992 YEARS OF EXPERIENCE 13 Years YEARS WITH RJ BEHAR 2001 - Present ENGINEERING EXPERIENCE At RJ Behar, Ms. Akyaz is responsible for plans preparation in both MicroStation and CAD software for roadway and civil engineering projects. She has ten years of experience in plans preparation on civil engineering projects. RELEVANT EXPERIENCE MUNICIPAL EXPERIENCE Palm Avenue (W. 45th Street to W.47t" Street) — City of Hialeah, Florida Roadway Designer - She prepared the plans for milling and resurfacing Palm Avenue from East 45" Street to East 471, Street. The project also included adding curb ramps to comply with ADA standards, replacing sidewalk, driveways and curb and gutter as needed, cleaning, sealing and adjusting drainage manholes and inlets and signing and pavement markings Wilde Park — City of Hialeah, Florida Roadway Designer— She prepared the site, paving and drainage design plans. Bucky Dent Park Design — City of Hialeah, Florida Roadway Designer — Responsible for the design to address flooding problems at the park. Milander Park Streetscape — City of Hialeah, Florida Roadway Designer — She prepared master plans for East 4711 and East 481, Street from Palm Avenue to East 151 Avenue. West 371h Street — City of Hialeah, Florida Roadway Designer — Responsible for the roadway plans for reconstruction of W 37" Street. East 41h Avenue Street Assessment — City of Hialeah, Florida Roadway Designer — She was responsible for the drafting of driveways, sidewalks and ADA ramps; curb and gutter, drainage, pavement, and utilities. The scope consisted of general engineering services for the assessment of sidewalks, ADA compliance and cost estimate for repairs or reconstruction of sidewalks of two segments of this roadway; from Hialeah Drive to East 2151 Street and from East 32W Street to East 53rd Street. Project length: 2.58 miles. E. 61h Avenue (from E. 911 Street to Hialeah Drive), E. 5d, Street (from E. 41^ Avenue to E. 61h Avenue), E. 5d, Street (from E. 6"t Avenue to E. 8th Avenue) — City of Hialeah, Florida Roadway Designer — She was responsible for the drafting of roadway plans, drainage, traffic control, signalization, utility relocation, as well as the design and drafting of signing and markings plans and lighting including lighting calculations. E.19 Avenue — City of Hialeah, Florida Roadway Designer — She prepared roadway plans, drainage design, signing and marking, signal plans, conversion of overhead to underground utilities. The project consisted of the reconstruction of 1.6 miles of City Street, conversion from one -way to two-way traffic. E. 10th, 11th, 12th, 13t', 1411,151h Street (from Palm Avenue to East 151 Avenue) — City of Hialeah, Florida Roadway Designer - Prepared roadway plans, drainage design, signing and marling. The project consisted of reconstruction of approximately 3700 feet of City Street. E. 10th, 11th, 12th, 131h, 1411, 1511(from East 151 Avenue to East 2^d Avenue) — City of Hialeah, Florida Roadway Designer — She prepared roadway plans, drainage design, signing and marking and utility coordination. The project consists of reconstruction of 3,700 feet of City Street. E. 16th, E. 17th, E. 18th, 19th, 20th (from Palm Avenue to East 151 Avenue) — City of Hialeah, Florida Roadway Designer — She was responsible for the roadway plans, drainage design, signing and marking and utility coordination. The project consists of reconstruction of 3,000 feet of City Streets. E. 16th, 18th, 19th, 201h Street, Curtis Drive (from East 151 Avenue to East 2^d Avenue) — City of Hialeah, Florida Roadway Designer — She prepared roadway plans, drainage design, signing plans, utility coordination. The project consisted of reconstruction 3700 feet of City Streets. RFQ No. 14 -07 -02 1 Page 13.34 NANETTEAKYA7_ West of US-1 Drainage Study Area — City of Hallandale Beach, Florida ® Roadway Designer — She prepared the exhibits and area calculations for the drainage report. Town Center Roadway Study — City of Coral Springs, Florida Roadway Designer — She prepared layouts of the bus stations and connecting roadways for transit improvements. TRANSPORTATION DESIGN EXPERIENCE Design/Build for the Reconstruction of SE 3b Street, Belle Glade, Florida — FOOT, District 4 Project Designer — She was responsible for the production of roadway plans, signing and pavement marking plans and quantities. The scope of this project included roadway plans, drainage design, signing and marking plans and utility relocation plans. The design included the use of filter fabric and a thick sub -base in lieu of demucking the roadway. Project length: 0.3 miles Northlake Boulevard over the Loxahatchee Slough — Palm Beach County, Florida Roadway Designer — The project consisted of reconstruction of a four lane divided highway, construction of a bridge, weir and walkway. She was responsible for the geometries, signing and pavement markings, weir placement and grading of the channel and walkway, quantity calculations and cost estimates. Project length: 0.349 milestbridge .007 miles. 1-75/Griffin Road Interchange, Broward County, Florida — FOOT, District 4 Roadway Designer — The scope consists of improvements including modifications to the interchange by realigning the 1 -75 ramps to converge at a new signalized intersection. Her responsibilities include the geometries, signing and pavement markings, signalization and long range estimates. Project length: 1 mile. US- 11SR -5, St. Lucie County, Florida — FOOT, District 4 Roadway Designer — Responsible for the signalization plans. 1.95 HOV, Palm Beach County, Florida — FOOT, District 4 Roadway Designer — Provided quality control review for two separate 1 -95 HOV design contracts. The scope of services included geometric, drainage, signing and marking, traffic control reviews. Powerline Road (SR -845) Palm Beach County, Florida — FOOT, District 4 Roadway Designer — She was responsible for the preparation of roadway quantities, computation book and transport input. The scope included complete design for widening and resurfacing of 3 miles of a major arterial roadway, including; drainage design, pavement marking and signing, overhead signing plans, lighting plans, seven signal locations, structural plans (bridge widening), a public involvement program and landscape improvements. Project length: 3 miles. 1.95 Pump Station, Pembroke Park, Florida — FOOT, District 4 Roadway Designer — She prepared the roadway plans for reconstruction of 30�11 Avenue. US-1/SR-5, Miami -Dade County Line to Hallandale Beach Boulevard — FOOT, District 4 Roadway Designer — She prepared the typical section package and quality control review. SR-80 Crestwood to 10511 Avenue — FOOT, District 4 Roadway Designer — She prepared the roadway, signing and marking and drainage plans. SR -A1A (from County Road to Flagler Memorial Bridge) Palm Beach County, Florida — FOOT, District 4 Roadway Designer — The project consisted of milling and resurfacing of 0.25 miles of a 44ane divided highway for FDOT, District 4 (2000). She was responsible for the drafting of roadway plans, drainage, traffic control, signalization, utility relocation, as well as, the design and drafting of signing and markings and lighting plans including lighting calculations. She was in charge of the quantities input in the FDOT CES system. Southern Boulevard (SR -80) from Forest Hill Boulevard to SR -7, Palm Beach County, Florida — FOOT, District 4 Roadway Designer — The project consisted of reconstruction of a 3 mile, 6 -lane divided urban highway for FDOT, District 4 (2000). Her responsibilities included drafting of the roadway plans, drainage, traffic control, signalization, utility relocation, signing and marking and lighting plans. SR-68 Orange Avenue (from 131^ Street to Indian River) St. Lucie County, Florida — FOOT, District 4 Roadway Designer — The project consisted of major reconstruction of 1 mile of a 4 -lane undivided highway for the City of Fort Pierce and FDOT, District 4 (1999). Responsible for the drafting of roadway plans, traffic control, signalization, utility relocation, as well as the design and drafting of signing and marking and lighting plans including lighting calculations. SR-615 (from Avenue O to US -1) St. Lucie County, Florida — FDOT, District 4 Roadway Designer — The project consisted of major reconstruction of 2.5 miles of a 6 -lane divided highway for FDOT, District 4. She was responsible for the drafting of roadway plans, drainage, traffic control, signalization, utility relocation, signing and marking and lighting plans. QR.J.Behar RFO No. 14-07-021 Page 1 3.35 MARLIN SCATTOLINI EDUCATION B. S. Civil Engineering, Florida International University, Miami, Florida, 2006 YEARS OF EXPERIENCE YEARS WITH RJ BEHAR 8 Years 2006 — Present OFFICE LOCATION: Pembroke Pines, Florida ENGINEERING EXPERIENCE At RJ Behar, Ms. Scattolini is in charge of design and plans preparation of roadway projects, drainage plans, signing and pavement marking plans, signalization plans, as well as permitting package. She has more than sic years of experience. RELEVANT EXPERIENCE SR-836 Auxiliary Lane and Interchange Improvements — Miami -Dade Expressway Authority (EAC Consulting, Inc.) Project Designer — The scope of this project is a SEIR study. RJ Behar is responsible for performing the typical section package, variance package, and drainage analyses for a 5 mile section of SR -836. SR-836 Emergency Access Ramp — Miami -Dade Expressway Authority Project Designer responsible for the roadway plans, traffic control plans, drainage analysis, utility coordination, lighting plans, signing and marking plans, structures (retaining walls) and special access gates. The project consists of an emergency ramp that connects the Florida Turnpike on -ramp to the SR 836 WB extension. Project length: 1 mile. Miami River Greenways, Segment D — City of Miami, Florida Designer — The project consists of the reconstruction of an existing roadway segment along the Miami River to produce a scenic, landscaped, pedestrianlbicyce walkwaylgreenway. The project includes the design of a drainage system with wells, decorative lighting and landscapethardscape design. Project length: 1 mile W. 291, Street 311 Safety Review (from Okeechobee Road to W. 4" Avenue) — City of Hialeah, Florida Project Designer for the design and production of roadway, drainage, signing and pavement marking plans. The scope of services consisted of a 3R Safety Review, which included crash data analysis and field observations to provide a report with recommendations to minimize the frequency of accidents. Project length: 1.5 miles Palm Avenue (from West 451, Street to West 49'" Street) City of Hialeah, Florida Project Designer for the design and production of roadway, drainage as well as signing and pavement marking plans. The scope of this project consisted of roadway improvements, milling and resurfacing, drainage, signing and pavement markings and lighting plans on Palm Avenue from West 451, Street to West 471, Street and from West 471, Street to West 491, Street in the City of Hialeah. Project length: 0.25 miles. NW 71,191, Avenue Connector (Design) — City of Fort Lauderdale, Florida Project Designer — The project includes the roadway design of a 1.5 mile urban section, 4 -lane divided, connector between NW 71, and NW 91, Avenues in Downtown Fort Lauderdale. The scope of this project includes signalization, drainage design, signing pavement marking and permitting as well as public involvement coordination. SW 328"' Street from SW 152^" Avenue to SW 137"' Avenue — Miami -Dade County Public Works Designer responsible for the preparation of roadway, signing & pavement marking plans and drainage plans. The scope of the project included master planning and feasibility analysis for the new roadway. This project involved the upgrading of the existing traffic signals to mast -arms and internally illuminated signs. The design phase for this project comprised of drainage, lighting, signalization, signing and pavement markings. Hialeah High School Parking Garage - Civil Plans — City of Hialeah, Florida Project Designer for civil site improvements for this parking garage. Her responsibilities included the water, sewer and drainage layout, signing and pavement marking. E.10 Avenue, E. 470' Street, E. 481' Street - Reconstruction — City of Hialeah, Florida Project Designer for the design and production of roadway, drainage as well as signing and pavement marking plans E. 41' Avenue Improvements — City of Hialeah, Florida - LAPIARRA Project Field Services Engineer — Responsible for roadway, signing & pavement marking plans and milling and resurfacing. The project consists of extensive field work in order to locate roadway deficiencies over the project's 21 block span. Milling and resurfacing, ADA improvements, curb, driveway and sidewalk repairs, utility locations, and signing and pavement marking repairs were some of the aspects documented for this project. This was a FOOT Loral Agency Program (LAP) project. One of the challenges of this project was to prepare roadway plans which would improve the roadway corridor while J" A l ).Behar RFQ No. 14 -07 -021 Page 13.36 MARLIN SCATTOLINI minimizing federal funds the City would have to use. This project is part of the American Recovery and Reinvestment Act ® (ARRA), which is supported by federal funds. Project length: 1.239 miles. Miami Dade County Lighting Projects — Miami Dade County Public Works Project Designer — The scope of the project induded lighting improvements. Powerline Road (SR -645) Palm Beach County, Florida — FDOT, District 4 Project Designer — Responsible for the preparation of roadway, signing and pavement marking plans, 3R reports, plans preparation, utility coordination, pavement design and quantities. Project length: 3 miles. SR -5 (US -1 /South Federal Highway) Broward /Palm Beach Counties, Florida — FDOT, District 4 Project Designer — She prepared the signing plans. SR-806 (Atlantic Avenue) Palm Beach County, Florida — FDOT, District 4 Project Designer — Responsible for the preparation of the signing plans. The scope included milling and resurfacing (RRR) of 2.8 miles of a major arterial roadway, including drainage improvements, pavement marking and signing, lighting plans, eight signal locations, a public involvement program and landscape improvements. Town Engineer — Town of Southwest Ranches, Florida Traffic Counter — She completed traffic counts. Transportation Master Plan Traffic Counts — City of Hallandale Beach, Florida Traffic Counter — She completed traffic counts and data collection. This project included 24 hour counts and turning movement counts for a master plan study aimed at improving congestion within the City of Hallandale Beach. Structural Inspection and Survey — Miami -Dade County Parks & Recreation Department Project Inspector — She assisted to preparing the structural inspection and survey reports for the 75 parks. Sunrise Athletic Complex, Additional Parking — City of Sunrise, Florida Project Designer — She was responsible for the parking lot improvements. Her responsibilities included the parking layout, signing and markings, drainage and utility coordination. SE 15th Street, South Miami Road, SE 101h Avenue Intersection Improvements — City of Fort Lauderdale, Florida Project Designer — She was responsible for the preparation of design analysis and plans. Seven Isles Entry Beautification — City of Fort Lauderdale, Florida ® Project Designer — The project consisted of improvements to the Seven Isles Entryway. These improvements included adding a parking space on the west side of SE 23rd Avenue as well as beautifying two of the existing bridges. Old Davie School Improvements — Town of Davie, Florida Project Designer — She was responsible for the parking and driveway layout. The scope of this project consisted of drainage, parking and utility improvements for an historical school (now converted to a museum) and adjacent park property. Coral Springs Aquatic Complex Parking Lot — City of Coral Springs, Florida Project Designer — She was responsible for the parking lot improvements. Her responsibilities induded the parking layout, signing and markings, drainage and utility coordination. Wolk Park Lake Improvements — City of Lauderhill, Florida Project Designer — Prepared the lighting plans. Springtree Canal Rehabilitation — City of Sunrise, Florida Project Designer — Prepared the design plans. Guardrail Retrofit Program — Florida Turnpike Enterprise (URS Corporation) Project Designer — Responsible for the preparation of the canal safety program plans, roadway and roadway analysis plans. qI � R.J.Behar RFQ No. 14-07-021 Page 13.37 MYLENE ALMEIDA, El CIVIL ENGINEERING EDUCATION B.S. Civil Engineering, Florida International University, 2012 YEARS OF EXPERIENCE YEARS WITH RJ BEHAR 4 Years 2014 - Present PROFESSIONAL REGISTRATIONS E.I. Florida License Number 1100016835, 2012 EXPERIENCE PROFESSIONAL SOCIETIES Member of ASCE FIU Chapter Ms. Almeida has graduated with a civil engineering degree. She is currently an Engineer Intern exam. At R.J. Behar & Company, Inc., she is currently preparing plans in Microstation and AutoCad. She is proficient in Microsoft Word, Excel, and Publisher. She is very familiar with the AASHTO Bridge Design Specifications, AISC Steel Construction Manual, and FDOT Structures Manual. She also is certified in Maintenance of Traffic RELEVANT EXPERIENCE Design Services for Lehman Causeway Wall- Sunny Isles Beach, Fl- Sunny Isles Beach Project Engineer- She is responsible for the production of roadway plans, signing and pavement marking plans Boulevard Resurfacing from NE 199th Street to NW 213th Street, Miami -Dade County - Reference: Mr. Danny Iglesias, PE, Project Manager; (305) 470 -5289; Email: dannv.iglesiasodot.state.fl.us Role: Project Engineer — She is responsible for the production of roadway plans, signing and pavement marking plans. The scope of work includes milling and resurfacing, pavement widening, median reconstruction, upgrading pedestrian facilities to comply with ADA requirements, signing and pavement markings, bike lane designations, and providing signalization and operational improvements at the intersections. Project Number: 414624- 3 -32 -01 Project Length: 1.2 miles Project Start: 6/2013 Project Complete: Ongoing Company: R.J. Behar & Company, Inc. (2014- Present) SR- 83610olphin Expressway Interchange at NW 87th Avenue (Bridges 1, 5 & 6) — Miami -Dade Expressway Authority Project Engineer — She designed cantilever overhead sign structures, mast arms, drilled shafts and lighting high mast poles using FDOT's structures design programs. She has also assisted with the design of concrete bridge decks using the MathCAD Program, calculations of finish grade elevations using Geopack, and preparing computational books and documented design quantities for bridge projects as per FDOT Basis of Estimates Manual, creation of reinforcing bar lists from scratch, supervised and scheduled the work to CAD technicians. She has also prepared Bridge Calculation Reports. Company: A &P Consulting Transportation Engineers (2012 —2014) City of Miami Capital Improvements Department: RRR Projects - City of Miami Project Engineer /Utility Coordination — She was responsible for drafting roadway plans and signing and pavement markings plans using the CADD system, Microstation, FDOT Site Menu and Geopak software. She also prepared and reviewed typical sections, cross sections, and horizontal and vertical alignment. Her responsibilities included preparing, reviewing, and updating roadway plans and other construction documents in Behar RFQ No. 14-07-021 Page 13.38 MYLENE PLAZ. El accordance with FDOT Plans Preparation Manual (PPM), FDOT Design standards and other design and construction standards. As utility coordinator, she obtained Sunshine One design tickets, prepared utility contact letters and plans to submit to utility agency owners. She was responsible for creating utility matrices, keeping track of utility work schedules and clearance letters, coordinated utility meetings and followed up on conflicts to prevent/avoid project delays. Company: A &P Consulting Transportation Engineers (2012 —2014) Consultant at Florida Department of Transportation District 6 Ms. Almeida prepared computational books and documented design quantities for projects as per FDOT Basis of Estimates Manual, prepared progress reports to attend design phases meeting to provide updates regarding the status of the project, worked on roadway design projects for FDOT and City of Miami. She prepared and reviewed reports to submit Design Approval Requests (exceptions and variations) as per FDOT Plans Preparation Manual. Ms. Plaz was also a Design Support Engineer, working on the implementation of new state- wide software: Project Suite Enterprise Edition (PSEE), developing Instructional Guidelines for Project Managers on how to use PSEE to request changes in scope of work, scheduling, and project estimate. Company: A &P Consulting Transportation Engineers (2012 —2014) Intern at E Sciences Inc. She performed NPDES inspections and reports and collected historical data for constructions sites. Company: E Sciences, Inc. (10/2010 -12 -2010) Skills ® • MathCAD • Microstation, Geopak • ArcGIS • AutoCAD • Highly proficient in Microsoft Excel, Microsoft Power Point, Microsoft Word and Adobe Acrobat. • Fluent in English and Spanish qw It R.).Behar RFQ No. 14 -07 -02 1 Page 13.39 YAJ AIRA L. MOLEIRO, E1 TRAFFIC ENGINEERING EDUCATION M.S. Transportation Engineering - Currently enrolled B.S. Civil Engineering, Villanova University, PA, 1986 YEARS OF EXPERIENCE YEARS WITH RJ BEHAR 27 Years 2013 - Present PROFESSIONAL REGISTRATIONS Engineer Intern, Florida License No.1095176, 1995 ENGINEERING EXPERIENCE Ms. Moleiro is a highly skilled professional with vast experience in the area of traffic engineering and design. Her skills include the use and application of the latest traffic data collection, crash analysis, traffic operations and transportation planning tools, techniques and software. She has in -depth knowledge of SYNCHRO, CORSIM, HCS 2010, SIDRA, TRANSYT 7F, TURNS 5 tool, TM -tool, SIGNAL -2000 and PASSER. Ms. Moleiro's experience also includes design, programming, and optimizing various computerized signal systems for the preparation of signal, signing and marking, and traffic control plans, traffic operations and traffic impacts, access and parking studies and macro and micro simulation traffic modeling. She has significant knowledge of the PD &E process and the Interchange Modification or Justification Guidelines. She has developed cost estimates and scope of services for projects in Miami -Dade, Broward and Palm Beach Counties. She has experience working with the Florida Department of Transportation, Pennsylvania Department of Transportation, Federal Highway Administration and Metropolitan Planning Organizations. RELEVANT EXPERIENCE Traffic Operations /Safety Studies — FOOT District 6 Traffic Operations/Safety Engineer — She is responsible for providing services including the development of safety and traffic operations studies. Traffic Engineering — City of Doral, FL Traffic Engineer/Transportation Planner — She is responsible for performing review of traffic calming studies, traffic impact studies and performing traffic operations and safety studies for the City of Doral. 1- 95/Donald Ross Road Interchange Design (IOAR) - FOOT District 4 Project Engineering responsible for developing all traffic engineering analyses including the Interchange Operational Analysis Report (IOAR) to conform to State and Federal policies and guidelines. 1-10, Project Development and Environment (PD &E) Study — FOOT District 2 Transportation Engineer— Task included operational analysis using HCS and SYNCHRO. Company: The Corradino Group, Inc. Traffic Impact Study — City of Homestead, FL Transportation Engineer — She assisted in the review of reports and technical analysis of the Traffic Impact Study submitted from private entities to the City of Homestead. Company: The Corradino Group, Inc. Coconut Grove Feasibility Study — City of Miami, FL Transportation Engineer — She was responsible for traffic forecasting and testing different alternatives to accommodate new design on a segment of the study area. The operational analysis was performed using SYNCHRO. Company: The Corradino Group, Inc. 1 -75, Project Development and Environment (PD &E) Study — FOOT District 4 Senior Transportation Engineer — Task included operational analysis, traffic forecasting, crash analysis and conceptual funding plan. The operational analysis was performed using HCS, CORSIM and SYNCHRO. Company: Reynolds, Smith & Hills, Inc. US 441 - Corridor Feasibility Study — FDOT District 4 Senior Transportation Engineer — Task included traffic forecasting and operational analysis using Generalized FDOT Tables. RFQ No. 14-07-021 Page 13.40 YAJAIRA 1%10LEIR0. E Company: Reynolds, Smith & Hills, Inc. ® 1.95 Managed Lanes Study — FDOT District 4 Senior Transportation Engineer — Task included operational analysis and traffic forecasting. The operational analysis was performed using SYNCHRO and CORSIM. Company: Reynolds, Smith & Hills, Inc. 1.95, Project Development and Environment (PD &E) Study — FDOT District 4 Senior Transportation Engineer — Task included operational analysis, traffic forecasting, crash analysis and conceptual funding plan. The operational analysis was performed using HCS. Company: Reynolds, Smith & Hills, Inc. 1.595, Project Development and Environment (PD &E) Study, Broward County, FL — FDOT District 4 Senior Transportation Engineer — Task included operational analysis, traffic forecasting, crash analysis and conceptual funding plan. The operational analysis was performed using HCS. Company: Reynolds, Smith & Hills, Inc. Districtwide General Planning Consultant// -595 System Interchange Modification Report (SIMR), Broward County, FL Senior Transportation Engineer — Task included operational analysis, and traffic forecasting. Company: Reynolds, Smith & Hills, Inc. 1- 9511ndiantown Road Interchange Modification Report (IMR) Palm Beach County, FL Senior Transportation Engineer — Planning study to develop and evaluate design alternatives for modifications of the I- 95 /Indiantown interchange. Task included operational analysis, traffic forecasting, crash analysis and conceptual funding plan. The operational analysis was performed using CORSIM and HCS. Company: Reynolds, Smith & Hills, Inc. Florida Intrastate Highway System (FIHS) Policy and Procedures Statewide Senior Transportation Engineer — She assisted in the review of reports and technical analysis of the IMR's and IJR's submitted from FDOT District offices or private entities. Company: Reynolds, Smith & Hills, Inc. ® SR-84 EB Slip Ramp Interchange Operational Analysis Report (IOAR) Broward County, FL Senior Transportation Engineer — She was responsible for documented the IOAR to shows the construction of the new SR- 84 EB Slip ramp. She provided for traffic operational analysis for the proposed ramp from eastbound SR-84 to eastbound 1- 595 at the 1- 75 /Sawgrass interchanges. The analysis was conducted in accordance with the Florida Department of Transportation and the Federal Highway Administration (FHWA) rules and regulations. Company: Reynolds, Smith & Hills, Inc. I.951Central Boulevard Interchange Justification Report (IJR) Palm Beach County, FL Senior Transportation Engineer — Task included operational anatysis, traffic forecasting, crash analysis and conceptual funding plan. The operational analysis was performed using CORSIM and HCS. Company: Reynolds, Smith & Hills, Inc. Districtwide General Planning Consultant, Broward County, FL Senior Transportation Engineer — She was responsible for the review of applications for Transportation Enhancements funding submitted by the Metropolitan Planning Offices (MPO's) and/or County Commissioner. She was also responsible for recommending eligibility and for coordinating with dients and sub consultants. Company: Reynolds, Smith & Hills, Inc. 1.9511.595 Interchange operational Analysis Report (IOAR) Broward County, FL Senior Transportation Engineer — She assisted in the documentation of the Interchange operational Analysis Report (IOAR) for the 1- 95/1 -595. She was responsible for the traffic operational analysis for existing and future conditions. Task included travel demand forecast, crash analysis and identification of the funding programs that will support the proposed improvements. Company: Reynolds, Smith & Hills, Inc. Miami- Dade County Transportation System Hurricane Emergency Preparedness Study Senior Transportation Engineer — Internal Project Manager for the development of a hurricane emergency preparedness plan of the Dade County Transportation System. Information from multiple sources was integrated in a Geographical Information System to perform database development, conduct analysis and produce strongly effective informative presentations. 0 Company: Post, Buckley, Schuh & Jernigan, Inc R.J.Behar �nl RFQ No. 14-07-021 Page 13.41 ALEXANDER SOCARRAS, El TRAFFIC ENGINEERING EDUCATION B. S. Civil Engineering, Florida Intemational University, 2011 YEARS OF EXPERIENCE YEARS WITH RJ BEHAR OFFICE LOCATION 7 Years 2007 — Present Pembroke Pines, Florida PROFESSIONAL REGISTRATIONS Engineer Intem, Florida License No.1100015631 ENGINEERING EXPERIENCE Mr. Socarras is currently an Engineer Intem. At RJ Behar, he is working with design and plans preparation for miscellaneous civil engineering projects. Mr. Socaras has been involved in numerous traffic count studies. He is very knowledgeable working with Microstation, AutoCAD, Corsim and Synchro software. RELEVANT EXPERIENCE Traffic Operations /Safety Studies — FOOT District 6, Florida Traffic Operations/Safety Engineer — He is responsible for providing services including the development of safety and traffic operations studies. Traffic Engineering — City of Doral, Florida Traffic Engineer — He is responsible for performing review of traffic calming studies, traffic impact studies and performing traffic operations and safety studies for the City of Doral. SR-836 Widening Traffic Study — Miami -Dade Expressway Authority, Florida Technician — He performed the traffic study including 72 hour counts and turning movement counts and compiled the data for the report. Project length: It is approximately 2.61 miles. 1.95/Donald Ross Road Interchange Design (IOAR), Florida - FDOT District 4 Project Engineering responsible for developing all traffic engineering analyses including the Interchange Operational Analysis Report (IOAR) to conform to State and Federal policies and guidelines. The study area includes the two signalized intersections west and east of the 1- 951Donald Ross Road Interchange and the intersection of Donald Ross Road with Heights Boulevard east of the interchange. Additionally, the unsignalized intersection of 64" Drive N. and Donald Ross Road, located west of the interchange, is included. The study will include the appropriate ramps within the subject interchange. Interactive Planning Tool - Miami -Dade Metropolitan Planning Organization (MPO) - Miami -Dade County, Florida Project Engineer — The scope included attending several meetings and providing meeting notes that included a list of attendees and a summary of the items discussed. These notes were incorporated into the final report; tested the functions of the interactive planning tool beta in -house and created a user guide consisting of written instructions and screenshots of how to use each function; developed a draft list of 15-20 maps that would be included in the map series. The list included descriptions of the area that will be shown in the map as well as the type of information illustrated; and developed and produced the final report. SR-80/Southern Boulevard Improvements PD &E Traffic Study, Palm Beach County, Florida — FDOT District 4 Technician — He performed traffic counts and data collection. The FOOT District 4 and the Federal Highway Administration are considering improvements to SR-80 in Palm Beach County, Florida. A Contamination Screening Evaluation Report was conducted to determine potential adverse effects associated with the widening of SR-80 in accordance with the FOOT Project Development and Environment (PD &E) Manual Volume 2, Chapter 22. The report identifies and evaluates the presence of known or potential contamination, presents recommendations, and discusses possible impacts to the proposed project Contamination Screening Evaluation Report. Project length: 8.7 miles ItR.J.Behar RFQ No. 14-07-021 Page 13.42 ALEXA NDER SOCARRAS. E ® SR- 8741Don Shula Expressway Ramp Connector to SW 13r Street PD &E Study, Miami -Dade County, Florida — Miami - Dade Expressway Authority Traffic Technician — He performed field reviews of 25 intersections; inducting traffic conditions, road geometry, driver interaction and trip generation. The study consists of the preparation of the PD &E traffic report, for the SR- 874 /Don Shula Expressway Ramp Connector to SW 136th Street. Grand Palms Traffic Study, Pembroke Pines, Florida Traffic Technician — He observed morning and evening turning movement counts to determine the need for additional lanes. This project consisted of performing a Traffic Study at the Entrance of the Grand Palms Resort and Pines Boulevard. RJ Behar & Company, Inc. was hired to conduct an intersection analysis for the intersection. This study was requested to evaluate the feasibility of adding a right turn lane to the northbound approach. 1-75/Griffin Road (SR -818) Intersection Traffic Study, Broward County, Florida — FOOT, District 4 Data Collector — He assisted with the study of signalized intersection analysis, weaving analysis, queuing analysis, interchange capacity analysis and crash analysis using the latest traffic software such as: Corsim, Synchro and FSUTMS /CUBE. An Interchange Operational Analysis Report (IOAR) was prepared. Transportation Master Plan Traffic Counts — City of Hallandale Beach, Florida Traffic Data Collector — He performed traffic counts and data collection. This project included 24 hours and turning movement counts for a master plan study aimed at improving congestion within the City of Hallandale Beach. Land Use Amendment Plan - Traffic Study/Traffic Counts — Town of Davie, Florida Data Collector — He performed traffic counts and data collection. RJ Behar prepared a traffic study, on behalf of the Town of Davie, for a Land Use Plan Application to increase density within the Town's Regional Activity Center. The study includes traffic counts, projections of the new traffic demand, and analysis of the existing and future operational conditions in the areas roadway network. Keystone Point Neighborhood Traffic Study — City of North Miami, Florida ® Data Collector — He performed traffic counts. RJ Behar was contracted by the City of North Miami to conduct a speed study for the Keystone Point Neighborhood. The study's objective was to determine the number of vehides traveling above the speed limit and overall traffic speeds throughout the neighborhood. Additionally, the report was to include traffic calming measures that could be implemented to deter speeding. NW 8711 Avenue /SR -25 Okeechobee Road Area Traffic Study, Miami -Dade County, Florida — FOOT, District 6 Traffic Engineer — He assisted in the traffic operations study to evaluate alternatives and determine potential improvement recommendations. 11 East 411 Avenue Improvements, Miami -Dade County, Florida — City of Hialeah - LAPIARRA Project Technician — He scanned the existing sidewalks and pedestrian conditions to offer a fee proposal for their repairs. This was an FOOT Local Agency Program (LAP) project. One of the challenges of this project was to prepare roadway plans which would improve the roadway corridor while minimizing federal funds the City would have to use. This project was part of the American Recovery and Reinvestment Act (ARRA), which was supported by federal funds. Miami River Greenways Segment D, Miami -Dade County — City of Miami, Florida Ufility Coordinator — He configured the utility status with the aid of a spreadsheet to monitor existing and future conflicts throughout the design process. The project consists of the reconstruction of an existing roadway segment along the Miami River to produce a scenic, landscaped, pedestrianlbicycie walkway /greenway. SW 32611 Street from SW 152nd Avenue to SW 13711 Avenue, Miami -Dade County, Florida — Miami -Dade County Public Works He assisted with the roadway plans preparation. The scope of the project included master planning and feasibility analysis for the new roadway. l Jgg I I RFO No. 14-07-021 Page 13.43 KIRA LEON; El DRAINAGE DESIGN /WATER AND SEWER EDUCATION B. S. Civil Engineering, Florida International University, April 2013 YEARS OF EXPERIENCE YEARS WITH RJ BEHAR -1 Year 2013 - Present PROFESSIONAL REGISTRATIONS E.I. Florida License Number. 1100018213, 2014 ENGINEERING EXPERIENCE Ms. Leon has recently graduated with a civil engineering degree. She has passed her Engineer Intern exam and is currently waiting for her certification. At R.J. Behar & Company, Inc., she is currently preparing plans in Microstation and AutoCad. She is proficient in Microsoft Word, Excel, and Publisher. RELEVANT EXPERIENCE SR-836 Widening - MDX 83628, Miami -Dade — Miami -Dade Express Authority Project Engineer — She is assisting with the drainage analysis and permitting. The scope of this project is a SEIR study. RJ Behar is responsible for performing the typical section package, variance package, and drainage analyses for a 5 mile section of SR -836. US -1 Lateral Ditch Restoration, Indian River County — FDOT District 4 Project Engineer — Her responsibilities include the preparation of the plans for the rehabilitation of twelve (12) outfall ditches in Indian River County. The ditches provide runoff discharge for US -1 and adjacent areas. The purpose of this project is to analyze the existing drainage conditions, and re -establish or improvement of the original design section for each ditch with the goal of restoring adequate drainage along US -1. SR- 976 1SW 40th Street at SW 97 Avenue, Task Work Order # 5 Crash Analysis — FDOT District 6 Data Collection Technician - She performed traffic counts during peak intervals of the day. RJ Behar & Company, Inc. was contracted to perform an Intersection Safety and Operational Analysis Study to consider intersection geometry, channelization, signal timing and phasing, AM and PM peak hour period traffic projects, and review the recent crash data reports. The study will recommend cost feasible improvement alternatives and address the traffic safety concerns. Milling, Resurfacing and Overlay Exhibits — City of Doral Project Engineer — She is responsible for preparing the roadway plans including field visits, preparation of milling and resurfacing recommendations, signing and pavement markings, utility coordination, and quantity estimations. The scope of this project included field reviews and recommendations for several segments of local roads under the City of Doral's Capital Improvement Project Resurfacing Program. 1.75 Express Lanes Segment D from South of Sheridan Street to North of Griffin Road, Broward County, Florida — FDOT District 4 Design/Build Project Project Engineer — She prepared quantity estimations for this design -build proposal. 1.75 Express Lanes Segment C from South of Miramar Parkway to South of Sheridan Street, Broward County, Florida — FDOT District 4 Design/Build Project Project Engineer — Her responsibilities included obtaining quantity estimations for this design -build proposal. % R.J.Behar RFQ No. 14-07-021 Page 13.44 S UG E ILY P ATXOT B. S. Civil Engineering, University of Puerto Rico, 2007 YEARS OF EXPERIENCE YEARS WITH RJ BEHAR 7 Years 2007 - Present OFFICE LOCATION: Pembroke Pines, Florida ENGINEERING EXPERIENCE Ms. Patxot has seven years of experience working on a wide range of water resource projects. At RJ Behar, Ms. Patxot is responsible for plans preparation, performing calculations and designing drainage systems. She has worked on the preparation of drainage projects as well as designing construction plans for sanitary sewers. RELEVANT EXPERIENCE SR- 86211.595 Final Design /Build, Broward County, Florida — FDOT District 4, FM #: 406094. 4.52 -01 Project Designer involved with developing the drainage master plan update, and assisting with the drainage design for several sections of the corridor. Design tasks included exfiltrafion trench design, storm sewer design and analysis, and both wet and dry retention stormwater management pond designs. The design involved the use of spreadsheets, ICPR, ASAD and Microstation. She is currently performing CAD designs for the post -design services. SR-9336/SW 328th Street from SW 152nd Avenue to SW 137th Avenue, City of Homestead, Florida — Miami -Dade County Public Works Department; Highway Division/Plans Review And Design Project Designer — She participated in the preliminary drainage design on this project. The scope of the project induced master planning and feasibility analysis for a new roadway, including evaluation of traffic signals. SR- 8201Hollywood Boulevard from SR -AIIA to US -1, Broward County, Florida — FOOT District 4, FM #: 41383515201 Project Designer: She assisted with the drainage calculations and report preparation. The project scope consisted of milling and resurfacing the existing pavement along Hollywood Boulevard in Broward County from just east of Young Circle to just west of the Intracoastal Waterway (SR -A1A). SR- 9731NW 87th Avenue, Miami -Dade County, Florida — FDOT District 6, FM #: 405615. 3.52 -01 Project Engineer who prepared the fill and dredge sketches. The scope included new construction and reconstruction of NW 871'Avenue from NW 7411 Street to NW 103rd Street in Medley, Florida. SR -AIIA Resurfacing Project, Palm Beach County, Florida — FDOT D4, FM #: 40361015201 Ms. Patxot prepared plan revisions during post design services. The scope consisted of roadway improvements along SR- AtA, from Boynton Inlet Bridge to Lake Worth Road. The project included a major drainage study and improvements, milling and resurfacing, signals, bridge improvements, signing and marking plans. Crown Linen Laundry — Hialeah, Florida Designer — She was responsible for the plans preparation of the water and sewer systems. The scope of services included data collection, water and sewer design and plans preparation. Ms Pabcot, in addition, was responsible for obtaining water and sewer permits from Miami -Dade County, Water and Sewer Department (WASD) and the Department of Environmental Resource Management (DERM). C-4 Canal Flood Protection Belen Section, Miami -Dade County, Florida — South Florida Water Management District Designer in charge of plans preparation for designing a floodwall for flood protection within Belen in Miami -Dade County. North County Neighborhood Improvement Project — Broward County, Florida Designer in charge of the plans preparation, drainage and quantity calculations. She has also provided services during construction as a construction office engineer. Her duties include reviewing pay quantities, and miscellaneous inspections. Broadview Estates BP 2 Sanitary Sewer Collection — Broward County Water and Wastewater Department Designer in charge of preparing plans and profiles for a sanitary gravity collection system for a complete neighborhood. Structure Inspection Program (SIP) Non -Sta Structures — South Florida Water Management District (SFWMD) Designer who coordinated the preparation of deliverables with the inspectors. She followed up with QC comments as well as dient comments. She planned and prepared tracking charts for all deliverables. She worked on the preparation of all the inspection reports in coordination with the inspection team. SW 1761, Street from SW 107th Avenue to US -1, Miami -Dade County, Florida — Miami -Dade County Public Works Designer for plans preparation. The scope of this project included master planning, feasibility analysis, and design. After the master planning was completed then the roadway design, drainage design, signing and marking designs proceeded. 23. J.Behar RFQ No. 14 -07 -02 1 Page 13.45 MARIANA URDANETA CIVIL FNGINEERING EDUCATION Bachelor of Design in Architectural Studies at Universidad Del Zulia, Maracaibo, Venezuela, 2004 YEARS OF EXPERIENCE YEARS WITH RJ BEHAR 9 Years 2005 - Present ENGINEERING EXPERIENCE At RJ Behar, Ms. Urdaneta is responsible for plans preparation for structural, landscaping, civil and roadway projects. She has been involved in multiple traffic studies including 24 hour counts and turning movement counts. Ms. Urdaneta has nine years of experience. RELEVANT EXPERIENCE Automated Bicycle Rental System Parking - Miami -Dade County MPO Technician - As part of this study, RJ Behar prepared a generalized bicycle parking guide layout. She was responsible for creating the plan, which included photos of bicycle rack designs, schematic drawings, list of bicycle rack elements, and placement locations Safe Routes to School Plans Study - Miami -Dade County Metropolitan Planning Organization Field Technician — She performed the field reviews to verify the improvements and gather additional information to facilitate the development of cost estimates. RJ Behar developed the spreadsheets utilizing the latest cost rates available from FOOT District 6. Origin Destination Surveys for Local Bus Routes — Miami -Dade County Metropolitan Planning Organization (Subconsultant to Kimley -Horn & Associates, Inc.) Data Collection — She performed on -board transit surveys along 22 Miami -Dade Transit bus routes for a transit ridership study. Florida International University Biscayne Bay Campus Area - Miami -Dade County Metropolitan Planning Organization Data Collector — She performed the peak period turning movement counts in an effort to improve the access to the Campus. Development of Truck Parking Facilities - Miami -Dade Metropolitan Planning Organization Field Technician — She performed field reviews to provide the data for the Beacon Lakes Development of Regional Impact (BL DRI) Access Connections to Roadway Network and Future Traffic Volume evaluations. S -197 Replacement Project - CEI — South Florida Water Management District Manatee Observer — She inspected the waterways while construction activities were performed. She notified the contractor or the CEI inspector when a manatee came within 50' of the construction activity. The construction work in the water had to stop until the manatee moved away on their own more than 50' from the construction activities in the water. Seawall Repairs at Indian Mound Park and Hillsboro Park — City of Pompano Beach, Florida Technician - Ms. Urdaneta is in charge of preparing civil plans to repair seawalls and site improvement at Hillsboro Inlet Park and Indian Mound Park. Exterior RemediationMater Intrusion RepairsflAO — New Renaissance Middle School, Broward County School Technician - She is in charge of creating the architectural plans, redrawing the existing buildings and locating water intrusion damages. Hialeah Public Works Site Plan — City of Hialeah, Florida In charge of preparing civil plans for the site redevelopment and drainage improvements for reconstructing the new Hialeah Public Works Complex. BCC Central Campus Building # 5 Technician - She provided CAD support for the preparation of plans for the Broward County Central Campus Building # 5 Stairs Repairs project. US -1 (Young Circle to S. of Sheridan Street) Technician - She was responsible for the preparation of a lighting plan for US -1 Young Circle to S. of Sheridan Street project. 01 J.Behar RFQ No. 14-07-021 Page 13.46 MARIANA URDANETA SW 326th Street from SW 152^^ Avenue to SW 1371h Avenue — Miami -Dade County Public Works Technician — She prepared the roadway plans. The scope of the project included, master planning and feasibility analysis for the new roadway. The project involved, upgrading the existing traffic signals to mast -anus, and internally illuminated signs. The design phase for the project comprised of drainage, lighting, signalization, signing and pavement markings. Hialeah Parking Garage - Civil Plans — City of Hialeah, Florida Technician — She prepared civil plans in regards to water and sewer drainage for the parking garage. West 29th Street Improvements — City of Hialeah, Florida - LAPIARRA Project Technician — Responsible for the preparation of a spreadsheet for the summary of the proposed work on W. 29th Street improvements. The scope of this project consisted of sidewalk, curb and gutter replacement and patching, driveway replacement and patching, manhole and inlet cleaning, inlets and valve box adjustments, replacement of inlet tops, removal and installation of single post signs. This project was part of the American Recovery and Reinvestment Act, which was supported by federal funds. The project consisted of extensive field work in order to locate roadway deficiencies. ADA improvements, curb, driveway and sidewalk repairs, utility locations and roadway repairs were some of the aspects documented for this project. This was a FDOT Local Agency Program (LAP) project. E. tm Avenue, E. 4Th Street, E. 481h Street - Reconstruction — City of Hialeah, Florida Technician — She designed plans for the reconstruction of the roadway, drainage, signing and pavement markings. Palm Avenue (W. 4Th Street to W. 49th Street) — City of Hialeah, Florida Technician — Responsible for the preparation of the spreadsheet for the summary of the proposed work on Palm Avenue (W. 47" Street to W. 49M Street) within the City of Hialeah. Structure Inspection Program (SIP) Non -Sta Structures — South Florida Water Management District (SFWMD) Technician — She prepared the drainage structure sketch plans and location photo map plan sheets. SE 15th Street, South Miami Road, SE 10th Avenue - Intersection Improvements — City of Fort Lauderdale, Florida Technician — She was responsible for preparing the design analysis plans. SR-7/Sunrise Boulevard Lighting Design — City of Lauderhill, Florida Technician — She prepared the lighting plans for the SR-7/Sunrise Boulevard project. Sunrise Lakes Boulevard Intersection Improvements — City of Sunrise, Florida ® Technician — She designed and prepared the roadway, signing and pavement marking plans. Southwest Ranches Multi -Use Trails — Town of Southwest Ranches, Florida Technician — Responsible for the preparation of the multi -use trail plans. 51h Street Fire Station Mezzanine Addition — City of Hialeah, Florida Technician — Prepared the structural plans for the 51h Street Fire Station. East 411 Avenue Street Assessment — City of Hialeah, Florida Technician — Prepared the graphic reports and sketches. Griffin Road Landscaping — Town of Southwest Ranches, Florida Technician — Responsible for preparing the landscape and irrigation plans for Griffin Road. Old Davie School Improvements — Town of Davie, Florida CADD Technician — The scope of this project consisted of drainage, parking and utility improvements for an historical school (now converted to a museum) and adjacent park property. Countess De Hoemle Park — City of Boca Raton, Florida Technician — She drafted plans for the structural elements. The buildings included two main restroom- vending buildings, dugouts, entry signs, poles and foundations of drawings for tot lots and bleachers. Crandon Marina Improvements — Miami -Dade County Park and Recreational Technician — Responsible for preparing the structural plans for the Crandon Marina improvements. Fleet Maintenance Facility — Miami -Dade County, Florida Project Engineer responsible for the site plans. The scope of this project included drainage design, permitting and utility coordination. Miramar Town Center Headwalls — Rock -Kim Miramar, Florida Technician — She prepared all the structural drawings. C 4 Canal Flood Protections - Phase III & IV (Belen) — South Florida Water Management District (SFWMD) Technician — Responsible for all of the structural drawings. Design of Pavement Repairs for Royal Palm Boulevard — City of Coral Springs, Florida ® Technician — She prepared the plans for repairs to Royal Palm Boulevard, MR.).Behar RFQ No. 14 -07 -02 1 Page 13.47 HERNANDO SEGURA CIVIL ENGINEERING /RODbVAY DESIGN EDUCATION Mechanical and Architecture Drafting, LACC, Los Angeles, Ca 1983.1985 Design University Jorge Tadao Lozano, Bogota Colombia 1979 -1980 YEARS OF EXPERIENCE YEARS WITH RJ BEHAR 29 Years 2009 - Present PROFESSIONAL EXPERIENCE Mr. Segura has over twenty years of experience in civil engineering, survey and mapping projects throughout California and Florida. He is also experienced in municipal land development (commercial and residential) and roadway projects using CALTRANS and FOOT standards. At RJ Behar, Mr. Segura produces complete design of construction plans on all types of civil engineering projects. RELEVANT EXPERIENCE SR- 5/US -1 /Overseas Highway from Fontaine Drive to S. of Tavernier Creek Bridge, Monroe County, Florida — FDOT, District 6 CAD Designer: The scope of services includes milling and resurfacing (Roadway plans) and (Typical Sections), and signing and pavement markings plans. ADA and pedestrian features upgrades. Additionally the Typical Section was modified to accommodate bicycle lanes without widening. The plans were done and in compliance with FOOT cad standards. Project length 0.08 miles. Design/Build for 1.595 Final Design, Broward County, Florida — FDOT, District 4 (AECOMIDragados) CAD Operator— He is updating sediment structure details for Arrowhead and Pine Island Outfalls; including updating plans, cross- sections and drainage Maps for Zone 4 and Zone 6. Project length: 10.5 miles. Congress Avenue and Park Avenue Intersection Improvement — Palm Beach County, Florida CAD Operator — He is responsible for preparing roadway plans for this intersection improvement in Palm Beach County. Project length: 937 ft. Design/Build for the Reconstruction of SE 3b Street, Belle Glade, Florida — FDOT District 4 CAD Operator — This is a road reconstruction project (0.03 mile) in West Palm Beach County. He was involved in the preparation of plans, including roadway, drainage, lighting and pavement markings. He also prepared the plans and profiles for a new 8' water main and 8' PVC sewer line. These plans were used for quantity take outs for final construction cost. Project length: 0.03 mile NW 7r"/9r" Avenue Connector (Design) — City of Fort Lauderdale, Florida CAD Designer — The scope includes design of a 1.5 mile urban section, 4 -lane divided, connector between NW 79, and NW 9" Avenues in Downtown Fort Lauderdale. The scope of this project includes signalization, drainage design, signing and pavement marking and permitting. The project also includes public involvement coordination. Project length: 1.5 miles Eller Drive Overpass ICTF (US -1 to McIntosh Road) Fort Lauderdale, Florida — FDOT, District 4 CAD Operator for the new $68 million Eller Drive ICTF Overpass Interchange with bridge improvements for the FOOT, District 4. This roadway is vital to Broward County and is part of the Strategic Intermodal System (SIS) connecting 1 -595 to Port Everglades. The roadway also provides a direct connection to the Port from Fort Lauderdale - Hollywood International Airport. SR-84, Collier County, Florida — FDOT, District 1 CAD Operator for the milling and resurfacing of 4 miles of an urban roadway section. The scope of services included development of typical sections, pavement design, 3R report, community awareness, roadway plans, Computation books, LRE and Tran'port. MIC -MIA Connector - Automated People Mover Miami Intermodal Center (MIC) — Miami -Dade County, Florida CAD Operator on the design and construction administration of a new ($200M) Automated People Mover (APM) System Connecting the Florida Department of Transportation's new MIC facility (which will serve as a major transportation hub for highway, mass transit and rail systems) to Miami International Airport's landside terminal pedestrian bridges and parking garage structures. QR.J.Behar RFQ No. 14 -07 -021 Page 13.48 RAFAEL URDANETA, CCM CONSTRUCTION ENGINEERING INSPECTIONS EDUCATION BSCE, Universidad Rafael Urdaneta, 1987 YEARS OF EXPERIENCE 25 Years AVAILABILITY CERTIFICATIONS: • Asphalt Paving Level I & II • Earthwork Construction Inspection Level I & 11 • Drilled Shaft Inspection • Pile Driving Inspection • Final Estimates Level I & II • QC Manager • Florida Certified Construction Manager • FOOT Concrete Field Technician I • FOOT Local Agency Program & FHWA Certification • IMSA Traffic Signal Technician Level 1 YEARS WITH RJ BEHAR 2004 - Present TIN #: U635730614040 • ISA Planting and Establishment with Grades and Standards of Nursery Plants • TROXLER Radiation Safety Officer Training • APNGA Annual Refresher Portable Nuclear Gauge • Excavation and Safety OSHA Certified • Stormwater Management Inspector • FES- Stormwater Management Designer • US -ACOE — Construction Quality Management for Contractors • Concrete Transport Construction Inspector ENGINEERING EXPERIENCE Mr. Urdaneta has over 25 years of experience in civil engineering construction management projects. He is very knowledgeable in public and private work projects including buildings, wastewater facilities, roadways, utilities, stormwater and drainage systems, water distribution, malls, high rise buildings, petroleum platforms, subdivisions and medical centers RELEVANT EXPERIENCE US-1 Federal Highway Beautification CEI Services — City of Delray Beach, FL - Local Agency Project Reference: Tim Tack, PE, Project Engineer, ESDICRA; 561- 243 -7315 Project Administrator - He is responsible for overseeing and monitoring all aspects of the project. He supervises the field inspection team; provides guidance and resolution on field changes that take place, responds to all contractor's RFIs and shop drawing submittals, scans all documentation into the LAP -IT program, and will make the final submittal of the PA Material Statement and closeout of the project. He is also responsible for observing the schedule and budget. Company: R.J. Behar FM #: 420412- 1 -58 -1 & 420412 -2 -58-01 Project Started: 2/2512013 Project Completed: On- going Project Length: 2.4 Miles SE 15th Avenue Bridge Replacement Construction Engineering Inspection- Fort Lauderdale, FL — Local Agency Project Reference: Mr. Dane Esdelle, PM- 954-828 -6885; Ms. Sierra Evans (954) 940 -7583 — FDOT Project Administrator - He is responsible for overseeing and monitoring all aspects of the project. He supervises the field inspection team; provides guidance and resolution on field changes that take place, responds to all contractor's RFls and shop drawing submittals, submits all reports and monitors the budget. The scope includes full bridge demolition and complete replacement of two existing low -level concrete bridges. These are two 130' span two-lane bridges over the Marcheta and Cadota Rivers; each containing 21 double tee beams each with new pre - stressed precast solid panels and an improved pre - stressed precast concrete pile foundation system, including Class 5 concrete finishing. The bridge replacement project scope also includes sidewalk widening, traffic railing barrier with aluminum pedestrianlbicycie railings on both sides, bridge deck grooving, minor roadway reconstruction, milling and resurfacing, pavement marking and signing, slope stabilization, utility relocations, lighting, and landscaping modifications including 133 cubic yards of riprap for bank protection. District 4 Cost/Fees Paid: $534,190.00 Construction cost: $3,814,743.00 Contractor. Baker Construction Company: R.J. Behar FM #: 230734- 1 -58 -01 Project Started: 915/2012 Project Completed: 10/30/2013 Project Length: 0.2 Miles SR- 71410keechobee Boulevard CEI — Palm Beach County, Florida — FDOT- LAP IN R.J.Behar RFC) No. 14 -07 -021 Page 13.49 RAFAEL URDANETA, CCM Reference: Mr. David L. Young, PE, (561) 684 -4149, PB Co.; Mr. Rick Peterson (561) 370 -1130, LAP Coordinator/PA ® FDOT Project Administrator — He is responsible for overseeing and monitoring all aspects of the project. He supervises the field inspection team; provides guidance and resolution on field changes that take place, as well as observing the schedule and budget. The structural components of this project included a new combined traffictrail signal system for the CSX/Tri-Rail Gate Crossing, new overhead truss cantilever sign structure drilled shaft foundations, five (5) signalization mast arm drilled shaft foundations, and Class II Structural Concrete for protection of existing piers underneath the overpass. He managed the CEI contract, supervised the field inspection; reviewed and approved the drilled shaft installation plan, including the review of the drilled shaft logs; ensured CSL Testing was performed as per the FDOT Specifications; document all comparison testing between the QC and VT laboratories; provided guidance and resolution on field changes that took place, coordinated with the Engineer of Record, responded to all contractor's RFIs and shop drawing submittals, was responsible for confirming and verifying approval of all the materials incorporated into the project, including all the structural steel, LIMS, and final submittal of the PA Material Statement. Cost/Fees Paid: $209,517.64 Construction Cost: $2,216,015.80 Contractor: Ranger Construction Company: R.J. Behar FM #: 229755- 2 -58 -01 Project Started: 6/2412011 Project Completed: 6130/2012 Project length: 0.3 miles Pines Boulevard (SR -820) and 1.75 (SR -93) Bridge Deck Repair, Local Agency Program (LAP) Project, Pembroke Pines, Fl — City of Pembroke Pines Reference: Mr. John Danielson, PE, FDOT, District 4 Project Administrator /Contract Support Specialist/Senior Bridge Inspector — He is responsible for overseeing and monitoring all aspects of the project. He handled all the documentation for this project. He supervises the field inspection team; provides guidance and resolution on field changes that take place, as well as observing the schedule and budget. The project included demolition and reconstruction of the concrete bridge deck to a depth of 3.5% sandblasting, check for steel deterioration, and re- install/splice new reinforcing steel as necessary; and final placement, casting, and curing of the new concrete overlay deck. Extensive coordination and MOT set -up was required on the 1.75 interstate during the Pines Blvd. bridge deck demolition operations. Two lanes of traffic were closed at a time beginning from the outside shoulder and ® working towards the median as the sequence of work on the deck above progressed. Company: R.J. Behar FM #: 414152- 2 -58 -01 Project Started: 5117/2011 Project Completed: 7/3112012 Project Length: 0.2 Miles Pines Boulevard (SR -820) and 1.75 (SR -93) Interchange, Local Agency Program (LAP) project, Pembroke Pines, FI — City of Pembroke Pines Reference: Mr. Joe McLaughlin, PE (954) 435 -6511 — City Engineer Project Administrator — He was responsible for overseeing and monitoring all aspects of the project. He supervised the field inspection team; provides guidance and resolution on field changes that took place, as well as observed the schedule and budget. The project included modifying the existing interstate overpass, entrance and exit ramps from a rural configuration to an urban configuration, as well as widening, signalization, landscaping, and access management improvements. A'Noexcuse Bonus' (250K) with an 'Incentive- Dentive' contracting method was utilized. Company: R.J. Behar FM #: 41415225801 Project Started: 1012012008 Project Completed: 4130/2011 Project Length: 1.26 Miles W. 36"' Avenue from West 76n' Street to West 84"' Street, American Recovery & Reinvestment Act (ARRA) Hialeah, FI — City of Hialeah Reference: Mr. Jose Sanchez (305) 687 -2611 — Streets EngineerlMr. Jorge Gomes, PE (305) 470 -5163 — FOOT District 6 Project Administrator — He was responsible for overseeing the reconstruction and final closeout package. The scope for this project included new sidewalk, curb and gutter, drainage improvements - new drainage inlets, 18' storm sewer cross drainage pipe, 1,271 LF of 18' exfiltration trench (French drain). The project scope also included pavement milling and resurfacing, signing and pavement markings, street lighting, tree removal, and grading of the adjacent swale areas and sod restoration with Performance Turf. Cost/Fees Paid: $126,263.09 Construction Cost: $559,334.45 Contractor: Horizon Contractors, Inc. Company: R.J. Behar FM #: 427604- 1 -58 -01 Project Started: 6/16/2010 Project Completed: 8/31/2011 Project length: 0.5 miles u 1% R.).Behar RFQ No. 14 -07 -021 Page 13.50 DALTON P O LANCO, El CONSTRUCTION ENGINEERING INSPECTIONS M. S. Construction Management, Florida International University, 1995 B. S. Civil and Architectural Engineering, University of Miami, 1993 YEARS OF EXPERIENCE YEARS WITH RJ BEHAR 20 Years 2008 - Present AVAILABILITY CERTIFICATIONS: • Asphalt Paving Technician Level I & II • Earthwork Construction Inspection Level I & II • Final Estimates I & II • Concrete Field Technician — Level I • Pile Driving Inspector • Drilled Shaft Inspector • ACI Concrete Field Testing Technician Grade I • MOT Intermediate Course TIN #: P452165530450 • QC Manager • IMSA — Traffic Signal Inspector Level I • CSX- Roadway Worker Protection • TROXLER - Nuclear Gauge Safety/Hazmat Training • HAZWOPER 40 HR Training • APNGA Annual Refresher Portable Nuclear Gauge • Stormwater Erosion Control ENGINEERING EXPERIENCE Mr. Polanco is a Civil Engineer with over 21 years of experience working on roadway and bridge construction projects. He has served as Senior Inspector on a variety of complex CEI roadway and bridge construction projects managing field personnel, quantities, project documentation, material testing and acceptance, and assisting in the Completion and processing of the monthly progress and final estimates packages. Mr. Polanco is extremely familiar with FOOT policies and procedures, as well as the Construction Project Administration Manual (CPAM), Basis of Estimates (BOE), and OSHA Regulations. His vast construction experience will be paramount for the successful management of the inspection team, while also providing support to the administrative staff. RELEVANT EXPERIENCE G 94 CMS Inspection Services, - South Florida Water Management District Reference: Martha Fox, Project Manager, 561-6682 -2575; Email: mfox(a)stwmd.00v Role: Onsite Representative — He has provided inspection services, reviewing the Contractor's work is in compliance the specifications, documenting the progress of the work through daily reports and pictures, in coordination with the District Project Manager. The work includes refurbishment of G94A, G94C and G94D and removal of USFWS P1 Pump and G94B. Company: R J Behar Project Start: 10/30/2013 SW 196t^ Avenue /Pembroke Road Design - Build, Pembroke Pines, FL — City of Pembroke Pines Reference: Mr. Joe McLaughlin, PE (954) 435 -6511 — City Engineer Senior Inspector — Mr. PolanCo temporarily substituted for the Sr. Inspector originally assigned to this project. While there, he performed inspections for the construction of approximately 2 miles of rural section collector and arterial. His duties included, shop drawing reviews, utility coordination, review of all materials furnished, resolving the contractor's Request for Information, monitoring stormwater pollution prevention and erosion control plans to ensure they are in compliance. He provided quality control for concrete and asphalt, plans Compliance monitoring and inspected the Construction of the roadway design, complex drainage including the design of twin 72' culverts, permitting, and wetland mitigation. Const/Fees Paid: $756,505.00 Construction Cost: $5.3 Million Company: R J Behar FINM N/A Project Start: 6110/2012 Project Complete: Ongoing Project Length: 2.0 Miles Milling and Resurfacing Sawgrass Expressway — Task Work Order # 2- Retaining wall Fascia (1122113) — Florida Department of Transportation Turnpike Enterprise Reference: Pacifico Castillo, PE, Project Manager, (954) 444 -8050 Senior Inspector — Inspections included the placement of a permanent 12" concrete retaining wall fascia with cap, and leveling pad at all four existing retaining walls; embedding existing soldier piles within cap; and regrading embankment and place sod. Mr. Polanco was responsible for all Construction inspections performed. J. 11 RFC/ No. 14-07-021 Page 13.51 DALTON POLANCO, El Company: R J Behar FM# 431281- 4 -52 -01 Project Started: 6/13/2012 Project Completed: 5/13/13 Project Length: ® 308 Feet Federal Highway (US-1) Beautification, Local Agency Program (LAP) Project, Delray Beach, FL — City of Delray Beach Reference: Tim Tack, PE, Project Engineer, ESDICRA City of Delray Beach; (561)- 243 -7315 Senior Inspector — He temporarily substituted on this project. His was responsible for overseeing all construction performed while on this project, completing interviews, and ensuring that the complete reconstruction, including widening for a street parking area, the addition of a 4 -foot bike lane, new turn left turn lane, new sidewalks, curb and gutter, decorative lighting, sod placement; and water main upgrades are constructed per the plans and speculations were in compliance with FOOT design standards. His duties also included preparing daily inspection reports; monitoring compliance with MOT plans, and attending progress meetings. The FOOT District four oversees all work being performed on this project. FM #: 420412 -1 -58-1 & 420412- 2 -58 -01 Project Started: 2125/2013 Project Completed: 2015 Project Length: 308 Ft SE 151h Ave. Bridge Replacement, Local Agency Program (LAP) Project, Ft. Lauderdale, FL — City of Ft. Lauderdale Reference: Ms. Barbara Howell, Project Manager, (954) 828-0505; Senior Inspector - The scope included full bridge demolition and replacement of existing concrete, 21 double tee beams with new pre - stressed precast solid panels and an improved pre- stressed precast concrete pile foundation system, including Class 5 concrete finishing. The project also included sidewalk widening, a traffic railing barrier with aluminum pedestrian/bicycle railings on both sides, bridge deck grooving, milling and resurfacing, pavement marking and signing, slope stabilization, utility relocations, lighting, and landscaping modifications. The project included the installation of 112 linear feet of seawall under the new bridge. He performed the field inspection, recorded the pile driving log records, verified and monitored the vibration levels around all existing adjacent structures, reviewed pile as -built installation plan, reviewed and analyzed engineer analysis reports for out of tolerance piles, and was responsible or confirming and verifying approval of all the materials incorporated into the project. Cost/Fees Paid: $534,190.00 Construction Cost: $ 3,814,743.00 Company: R J Behar FM #: 230734 - 1.58 -01 Project Stared: 9/5/2012 Project Completed: 10/3012013 Project Length: ® 0.2 Miles Ocean Avenue Bascule Bridge Over Intracoastal In Lantana, Palm Beach County, Florida Reference: Francois Thomas, PE, (561) 687 -8536 Senior Bridge Inspector - He performed inspections for the pile driving operation performed by the contractor. He inspected the pile driving installation which consisted of verification of driving criteria for the test piles being driven as part of the test pile installation plan, including pile location, design criteria, soil boring data, installation operation, collecting pile driving data with saximeter in close coordination with the Geotechnical Engineering Company, PDA analysis data collection and pile driving evaluation, hammer energy determination, accessories verification and documentation, pile condition and measurements, equipment and template location including survey monitoring, and documentation. Cost/Fees Paid: $ 30,750.00 Construction Cost: 30 Million. Contractor: GLF Construction Company Company: R J Behar FM #: 2003502- 1 -58 -01 Project Started: 4110/2012 Project Completed: 9/30/2012 Hillsboro Boulevard at Military Trail Intersection Improvements, Broward County, FI — Broward County Highway Construction and Engineering Reference: Mr. Richard Tomese, PE, (954) 577.4579 Senior Roadway Inspector — He verified materials incorporated into the work, verified sampling and testing, prepared daily inspection reports, reviewed shop drawings, and monitored the compliance with MOT plans as well as monitored schedules and dates. He also served as liaison between the contractor and county. Company: R J Behar County #: 78422 Project Started: 17712011 Project Completed: 2/28/2013 Project Length: 0.8 Miles Atlantic Boulevard at Rock Island Road Intersection Improvements, Broward County, Fl — Broward County Highway Construction and Engineering Reference: Mr. Richard Tomese, PE, (954) 577 -0579 Senior Inspector — The project consisted of the construction of a WB left turn lane, WB right turn lane, and dual left -tum lanes on all four legs of the intersection. In addition, the project included drainage, sidewalks, curb and gutter, signalization, signals, roadway widening, milling/resurfacing, and signing and pavement markings, landscaping, and irrigation improvements. Project length: 0.5 miles. Company: R J Behar County #: 78421 Project Started: 17712011 Project Completed: 2/28/2012 Project Length: 0.5 Miles WR.J.Behar RFQ No. 14-07-021 Page 13.52 MAURICIO PINZON CONSTRUCTION ENGINEERING INSPECTIONS EDUCATION B.S. in Civil Engineering, Colombia, 2000 YEARS OF EXPERIENCE 8 Years AVAILABILITY CERTIFICATIONS: • Asphalt Paving Technician Level I & II • Earthwork Construction Inspection Level I & II • Concrete Field Technician Level I & II • Final Estimates Level I & II • Pile Driving • Drilled Shaft YEARS WITH RJ BEHAR 2008 - Present TIN #: P525545752040 • IMSA Traffic Signal Technician Level I • TROXLER Nuclear Gauge Safety/Hazmat Training • APNGA Annual Refresher Portable Nuclear Gauge • FDOT Signalization Construction Training/Slap Team • Stormwater Management • CSX Roadway Worker Protection ENGINEERING EXPERIENCE Mr. Pinzon has over eight years of experience in roadway design and construction engineering inspection projects. His experience includes inspection of structural fabrication, concrete, drainage structure installation, earthwork, asphalt paving, lighting, signalization, ensuring contractors compliance with MOT, and is proficient with FDOT and SFWMD reporting and documentation procedures. Mr. Pinzon also worked as a CEI and Construction Engineer on several projects for the National Highway Institute and Urban Development Institute in Bogota, Colombia. RELEVANT EXPERIENCE Federal Highway (US -1) Beautification, Local Agency Program (LAP) Project, Delray Beach, FL — City of Delray Beach Reference: Tim Tack, PE, Project Engineer, ESD /CRA; 561- 243 -7315 Senior Inspector /Contract Support Specialist — His tasks as Sr. Inspector include preparing daily inspection reports, ensuring the contractor is following the maintenance of traffic plans, attend all progress meetings, inspect all construction performed on this project which includes widening for a street parking area, the addition of a 4 -foot bike lane, new turn left turn lane, new sidewalks, curb and gutter, decorative lighting, milling and resurfacing, including some overbuild areas, pavement markings, drainage modifications, construction of bulb-outs in the radius returns of the side streets, sidewalks, new traffic signal loops at all intersections, new underground traffic signal interconnect system, irrigation, and landscaping. As a CSS he is responsible for the progress and final estimates, processing contract changes, EEO compliance, and finalizing all paper work for the project. FM #: 4204121581 & 4204122581 Project Started: 212512013 Project Completed: on -going Project Length: 2.4 Miles Origin Destination Surveys for Local Bus Routes — Miami -Dade County Metropolitan Planning Organization (Subconsultant to Kimley -Horn & Associates, Inc.) Data Collection — He performed on -board transit surveys along 22 Miami -Dade Transit bus routes for a transit ridership study. FM #: N/A Project Started: 312912013 Project Complete: 6130/2013 Project Length: N/A W. 16th Avenue from W. 7P Street to W. 840, Street, CEI Services — City of Hialeah, Florida — FOOT LAP, FDOT District 6 Reference: Mr. Jose Sanchez (305) 687 -2611 — Streets Engineer Senior Inspector /Contract Support Specialist — As Sr. Inspector he checked consistency of shop drawings to plans; verified materials; monitored the construction activities, prepared daily inspection reports; monitored compliance with MOT plans, managed utility coordination. He inspected the complete reconstruction, curb and gutter, drainage improvements, pavement milling and resurfacing, signing and pavement markings and grading of the adjacent Swale areas and sod restoration. Being the contract support specialist entailed reviewing change orders and pay requests, performing document control, processing contract changes as well as acting as a liaison between the Contractor, FOOT District six personnel and the City. WR.j.Behar RFQ No. 14-07-021 Page 13.53 MAURICIO PINZON FM #:42760435801 Project Started: 1111/2012 Project Completed: 1/1512013 Project Length: 0.48 ® Miles W. 53b Street from W.1P Avenue to W. 1P Avenue, —City Of Hialeah, Florida; FDOT ARRA Reference: Mr. Jose Sanchez (305) 687 -2611 — Streets EngineerlMr. Jorge Gomes, PE (305) 470 -5183 — FDOT, District 6 Contract Support Specialist/Inspector - He scheduled field meetings and attended progress meetings; managed utility coordination; reviewed RFI's and requests for clarification; prepared daily inspection reports; reviewed and analyzed change orders and pay requests; and project doseout. The scope included new sidewalk, curb and gutter, new drainage inlets, 18' storm sewer cross drainage pipe, 18' exfiltration trench, pavement milling and resurfacing, signing, pavement markings and grading of the adjacent swale areas and sod restoration. FM #: 427604 -1 -58-01 Project Started: 8117/2010 Project Completed: 6/30/2012 Project length: 0.5 miles Resurfacing of SW 1P Street (SR -869) from Powerline Road to Newport Centre Drive, Hybrid Project — Florida Department of Transportation, District 4 Reference: Project Manager- FDOT D4- Javier Bejarano, PE (954) 677 -7055; Project Administrator: Arturo Castro (954) 677 -7055 Senior Inspector — He was responsible for managing utility coordination; reviewing RFI's and requests for clarification; verifying materials; preparing daily inspection reports; monitoring compliance with MOT plans; reviewinglanayzing change ordersipay requests; monitoring the construction activities/procedures. The scope consisted of milling, resurfacing, adding a shoulder and sidewalks on the north side of the roadway. ADA upgrades at crosswalks, signalizaton improvements, minor drainage improvements, and guardrail enhancements over the existing bridge structure. Company: R.J. Behar FM #: 4246651.52 -01 Project Started: 211412012 Project Completed: 3/22/2013 Project Length: 1.829 Miles Atlantic Boulevard at Rock Island Road Intersection Improvements, Broward County, FI — Broward County Highway Construction and Engineering Reference: Mr. Richard Tomese, PE, Director of Broward County Engineering, (954) 577 -0579 Inspector - He assisted the senior inspector with managing utility coordination; reviewing RFI's and requests for clarification; checking shop drawings for conformity to plans; preparing daily inspection reports; monitoring compliance with MOT plans; monitoring the construction activities and procedures. The project included drainage, sidewalks, curb and gutter, signalization, signals, roadway widening, milling and resurfacing, signing and pavement markings, landscaping, and irrigation improvements. Project length: 0.5 miles Company: R.J. Behar County #: 78421 Project Started: 11712011 Project Completed: 212812012 Project Length: 0.5 Miles Hillsboro Boulevard at Military Trail Intersection Improvements, Broward County, FI — Broward County Highway Construction and Engineering Reference: Mr. Richard Tomese, PE, Director of Broward County Engineering, (954) 5774579 Senior Inspector — He assisted the senior inspector with managing utility coordination; reviewing RFI's and requests for clarification; checking shop drawings for conformity to plans; preparing daily inspection reports; monitoring compliance with MOT plans; monitoring the construction activities and procedures. The project included drainage, sidewalks, curb and gutter, signalization, signals, roadway widening, milling/resurfacing, and signing and pavement markings, landscaping, and irrigation improvements. Project length: 0.8 miles. Company: R.J. Behar County #: 78422 Project Started: 117/2011 Project Completed: 2/28/2012 Project length: 0.8 miles North County Neighborhood Improvements Project, Phase II, Broward County, Fl— Broward County Water and Wastewater Department Reference: Mr. Jose McCray, Project Manager (954) 628 -3634 Senior Inspector — Responsibilities entailed providing construction inspection of the drainage improvements which consisted of new exfiltration systems, the addition of drainage catch basins, and control structures with weirs and a connection to existing outfalls. Other tasks were quantity vedfication, preparation of monthly and final estimates documentation, projections of costs and quantifies, preparation of contract work orders/change orders and supplemental agreements. He also reviewed invoices, and tracked material certification documents Costl Fees Paid: $881,266.00; Construction Cost: $88,000,000 (Est.) Company: R.J. Behar FM #: NIA Project Started: 31512007 Project Length: N/A 11 IMR.J.Behar RFQ No. 14-07-021 Page 13.54 HUMBERTO SOTERAS CONSTRUCTION ENGINEERING INSPECTIONS Fadeigh Dickinson University, 1981 YEARS OF EXPERIENCE 21 Years CERTIFICATIONS: • Final Estimates Level I & II • Earthwork Inspection Level I & II • Asphalt Paving Technician Level I & II • Concrete Field Testing Technician 1 • Pile Driving YEARS WITH RJ BEHAR 2013 - Present TIN #: 5362320603360 • ACI Concrete Transportation Construction 1 • MOT Intermediate • Nuclear Safety Training • Stormwater Management Inspection ENGINEERING EXPERIENCE Mr. Soteras has over 21 years experience in Construction Engineering and Inspection. He has worked as a consultant and directly for the Florida Department of Transportation's District 4 Construction. His many years of experience, field skills, dedication and knowledge of final estimates and project documentation are a great asset to any project. RELEVANT EXPERIENCE SW 2071, Terrace/SW 541, Place, Pembroke Pines, Florida — City of Pembroke Pines Reference: Mr. George Wrves, Project Manager, 954 -435 -6582 Role: Senior Inspector responsible for overseeing the construction of the new two -lane, two-way roadway that lies in the City of Pembroke Pines and will run from SW 2071, to SW 2051, Avenue. He makes sure that the Contractor is constructing the road to conform to the specifications, records daily reports, attends meetings, and reviews Requests for Information. Project Length: 43 acres Project Started: 112412013 Project Completed: Ongoing Company: R.J. Behar & Company, Inc. (2013 - Present) SW 1961, AvenuelPembroke Road Design Build, Pembroke Pines, Florida — City of Pembroke Pines Reference: Mr. George Wrves, Project Manager, 954 - 435 -6582 Role: Senior Inspector in charge of overseeing the construction of a rural section collector and arterial. The project includes roadway design, complex drainage including the design of twin 72' culverts, permitting, wetland mitigation, and extensive earthwork with the use of Geogrid to avoid extensive demucking, and utility coordination. He submits daily reports, checks RAs, and makes sure the road is being constructed to the specifications of the plans. Project Length: 2 miles Project Started: 611012012 Project Completed: Ongoing Company: R.J. Behar & Company, Inc. (2013 - Present) SR-834/Sample Road, SR -71US -441, SR-814/Atlantic Grouping - FDOT District 4 Reference: FDOT PM — Ms. Roxanne Riggs, P.E. (954) 958 -7675 Role: Senior Roadway Inspector — He was responsible for the daily inspection, documentation and coordination of other inspectors for this $10 million grouping located in the municipalities of Margate, Coconut Creek, Coral Springs and Pompano Beach. The main scope of the projects included milling and resurfacing, major signalization and lighting improvements, drainage installation, landscape and irrigation installation and ADA upgrades. Project Started: January 2011 Project Completed: December 2012 SR 1.75 Interchange Bridges (10 Bridges) & SR-838/Sunrise Blvd Bridge - FDOT District 4 Reference: FDOT PM — Mr. Eghbal Jalali (954) 958 -7641 Role: Contract Support Specialist/Senior Bridge Inspector — He was the CSS for these projects, responsible for the accuracy and compliance with FDOT of all project documentation, performed all scanning of documents into the FDOT's EDMS data base and generated monthly estimates. He also performed as a Senior Inspector on these two projects, which consisted of deck repairs and an epoxy overlay of ten concrete box girder segmental bridges at the 1.7511 -595 Sawgrass Expressway Interchange; and structural coating repairs of the Sunrise Blvd. Bascule Steel Bridge rehab over the Intracoastal Waterway. The scope of work included cleaning, sealing and injecting epoxy into segment joints, removing RFC! No. 14 -07 -02 1 Page 13.55 HUMBERTO SOTERAS expansion joint devices and replacing with a type 2 Polymer, and applying epoxy overlay on the entire roadway deck of all ® ten bridges, and the recoating of the structural steel of a bascule bridge over the Intracoastal. Project Started: November 2009 Project Completed: January 2011 SR-834/Sample Road, Rock Island to SR-441 - FDOT District 4 Reference: FDOT PM — Mr. Javier Bejarano P.E. (954) 931 -6179 Role: Contract Support Specialist/Senior Inspector — He provided the department with an excellent service and multi- tasking skills by performing a dual role in this project. He performed as the CSS for this project, responsible for the accuracy and compliance with FDOT, of all project documentation, performed all scanning of documents into the FDOT's EDMS data base and generated monthly estimates. He was the Senior Inspector on this project, responsible for monitoring and documenting the Contractor's daily activities for this Hybrid project which included: widening, milling and resurfacing, access management improvements, replacement and upgrading of existing signing and pavement markings. Project Started: January 2009 Project Completed: December 2009 SR- 5/US -1 SE 301^ Street to SR-84 - FDOT District 4 Reference: FDOT PM — Mr. James Jeffers, P.E. (954) 958 -7628 Role: Senior Inspector — He was responsible for monitoring and documenting all construction activities, including roadway widening, milling & resurfacing, drainage, lighting, signalization, and landscaping for this centrally located project along the US-1 corridor between the Fort Lauderdale Airport and the entrance to the port, which involved heavy public involvement and utility coordination efforts. Project Started: May 2008 Project Completed: January 2009 Broward Operations General Assign Contract, Broward County, FL - FDOT District 4 Reference: FDOT Project Engineer, Felix Garcia, P.E. 954- 776A300 Role: Senior Inspector - Assigned to an FDOT in -house signalization project on SR 818 /Griffin Rd. His responsibilities included monitoring, documenting and reporting all project activities, provided support for the FDOT Project administrator with processing monthly and final estimates, scanned all documents into EDMS, and assisted in processing final material certification for this in house project. Company: The Coradino Group: Project Started: Jan. 2008 Project Completed: May 2008 ® SR-821 HEFT Projects, Miami -Dade County, FL - Florida Turnpike Authority Role: Senior Project Inspector responsible for monitoring and documenting the Contractors' daily operations, to include construction and installation of drainage systems, MSE Walls construction, pile driving operations, roadway embankment, subgrade and base inspections, asphalt paving, etc. Responsibilities also included the coordination and monitoring of the Contractor's Maintenance of Traffic, Environmental and storm water pollution Controls, the materials Q.C. program and Technicians, inducting all material and sample entries into LIMS and coordination with Verification and Turnpike's an FDOTs material Labs., etc. Project Started: Jun 2006 Project Completed: Dec 2007 Construction, North Dade Residency FDOT District 6: Reference: Isa Nunez, RE 305499 -2381 Role: Sr. Project Inspector - Responsible for monitoring and documenting the Contractors' daily operations on various Projects, to include construction and installation of Signal & Lighting components, Concrete Placement, asphalt paving, etc. Responsibilities also included the coordination and monitoring of the Contractor's Maintenance of Traffic, Environmental and stone water pollution Controls, Q.C. and Verification Programs. Project Started: Jan 2006 Project Completed: Jun 2007 Construction, SR -934 Hialeah Expressway Reconstruction Project, FDOT District 6: Reference: Roland Rodriguez 305 -499 -2370 Role: Sr. Project Inspector- Responsibilities included monitoring and documenting the Contractors' daily operations, to include construction and installation of drainage systems, MSE Walls construction, pile driving operations, roadway embankment, subgrade and base inspections, asphalt paving, etc. Responsibilities also inducted the coordination and monitoring of the Contractor's Maintenance of Traffic, Environmental and storm water pollution Controls, the materials Q.C. program and Technicians, an FDOT's Verification Materials Model program and respective technicians, including scheduling and coordination Project Started: Nov. 2003 Project Completed: Dec 2005 D DE J.Behar RFQ No. 14 -07 -02 1 Page 13.56 IL a� c e s ENGINEERING ENVIRONMENTAL ECOLOGICAL Mr. Freedman is an experienced environmental professional serving public and private clients throughout the State of Florida. He specializes in environmental review of transportation related projects through all phases of the project (planning, design, permitting, Conswction and post-construction monitoring). Mr. Freedman has conducted National Pollutant Discharge Elimination System (NPDES) and permit compliance inspections of Florida Department of Transportation (FDOT) assets, and mitigation and maintenance monitoring for dozens of FDOT constructed sites. He has assisted with the permitting of numerous FDOT projects and has written more than 70 National Environmental Policy Act (NEPA) memos for minor transportation projects and technical documents for Project Development and Environment (PDBE) Studies and Reevaluations. Freedman is also an advanced diver with extensive experience conducting benthic resource surveys. Mr. Freedman also specializes in municipal consulting and has provided plan review, landscape inspection, environmental assessments, expert witness, permitting, ordinance development, street tree inventory, canopy assessments, carbon sequestration analysis and wildlife permitting services to municipalities throughout south Florida. He has also conducted numerous studies related to climate change and sea level rise and was involved with the preparation of the Broward County Climate Change Action Plan. Project Experience Justin Freedman, MS Senior Scientist Education M.S., Marine Biology, Nova Southeastern University Oceanographic Center B.A., Biology, Tufts University Professional Licenses / Certifications Certified Arborist, FL 5488A Tree Risk Assessment Qualification (ISA) FDEP Certified Erosion and Sediment Control Inspector and Instructor Certified Manatee Observer PADI Advanced Open Water, Enriched Air Certified Diver Certified Landscape Inspector Certified Green Industries Best Management Practices Instructor Certified in Advanced Maintenance of Traffic Years of Experience 12 ®City of Key West City Hall Arborist Assessment — The City of Key West is relocating its City Hall facilities to the site of the former Glynn Archer Elementary School at 1300 White Street. In support of landscape and architectural design efforts, Mr. Freedman conducted an assessment of the approximately 65 trees at the site. The purpose was to assess the health and condition of the trees at the site, and to provide recommendations for preservation, transplantation and/or removal and replacement associated with the new design and in accordance with the City's municipal code. Tamiami Canal Historic Swing Bridge Replacement Reevaluation, FDOT District Six, Miami -Dade County, Florida — The existing swing bridge was originally constructed as the Miami River's 27th Ave. River crossing in 1921, and subsequently relocated to its current Tamiami Canal location in 1941. The bridge is one of three bob - tailed swing spans in Florida and is one of the oldest bridges on the Miami River. The bridge is structurally deficient and functionally obsolete, and will not be able to accommodate future high traffic demands. Mr. Freedman reevaluated the E4/FONSI for a historic bridge replacement project in Miami -Dade County. Work included coordination with the three agencies with overlapping jurisdiction over the project – FDOT, Miami -Dade County and City of Miami, as well as numerous consultants. Florida Keys Bridge Inspections, FDOT District Six, Monroe County, Florida — This project involved SCUBA diving and inspecting bridge construction projects for debris. Mr. Freedman assessed three bridges, documenting fallen debris, and provided recommendations for its removal. Dune Enhancement and lighting Design and Permitting, City of Dania Beach, Broward County, Florida — For this project, Mr. Freedman designed and permitted enhancements to dunes along Dania Beach's signature beach. This project was initiated due to public safety concerns and became controversial as the project included the removal of a stand of seagrape trees. Mr. Freedman worked closely with FDEP permitting agency staff and sea turtle experts from the FWC, and coordinated with a number of environmental advocacy groups that initially voiced opposition for the project. Through meetings and presentations, Mr. Freedman demonstrated the environmental and public safety value of the project and received consensus among the stakeholders. Work for this project included reviewing and making recommendations to make lighting at the beach more sea turtle friendly, designing lighting shields, designing dune landscaping, preparing a sea turtle protection ordinance, construction oversight and post- construction monitoring. RFQ No. 14 -07 -02 1 Page 13.57 Justin Freedman, MS ® Sea Turtle Protection, Lighting Analysis, City of Dania Beach, Broward County, Florida — For this project, Mr. Freedman assessed beachfront lighting for general condition and sea turtle friendliness (compliance with Section 62B -55, FAC) and provided recommendations to the City to bring lighting into compliance. Grandview Palace Marina Permitting Support, Glasgow Equipment, North Bay Village, Miami -Dade County, Florida - Glasgow equipment contacted Mr. Freedman to assist with a contentious permitting issue through the FDEP. He provided technical support, resulting in permit issuance. Benthic Resources Survey and Permitting for Conduit Under Bear Cut, Miami -Dade County, Florida — Mr. Freedman provided environmental assessment and permitting support for the installation of approximately 2,550 linear feet of conduit located along the ocean side of the Bear Cut Bridge of the Ridkenbacker Causeway in Miami -Dade County, Florida. E Sciences conducted a wetland delineation, seagrass survey, benthic habitat survey and delineated extents of mangroves within the project area. E Sdences subsequently worked with the design engineers to develop construction methodologies to minimize resource impacts and thereby minimize permitting requirements. Due to dose coordination with agency regulators and design engineers, the project will qualify for a Standard General Environmental Resources Permit from the FDEP. Additionally since the project will avoid impacts to mangroves Miami -Dade County authorization will not be required for the project, saving valuable time and money for the project. Canopy Analysis, City of Miami Beach, Miami -Dade County, Florida — Mr. Freedman served as the project manager for this canopy analysis project for the City of Miami Beach, which was conducted under E Scieinces' General Environmental Engineering Services contract for the City. Using i -Tree Canopy, Mr. Freedman and his team estimated the canopy coverage for the Citys urban forest, as well as percentage of available space remaining within the City for additional tree planting. Mr. Freedman developed a one -page brochure for public education documenting the information from the study. ® General In -house Environmental Services, FDOT District Four, Florida — Mr. Freedman served three days a week as in- house environmental specialist in the FDOT District Four Planning and Environmental Management (PLBEM) Office. Work included performing environmental phase reviews and preparing and reviewing NEPA documentation for over 70 roadway and bridge projects including field identification of listed species habitat, wetlands, historic resources, Section 4(f) and contaminated sites. Ll Environmental Review 1 NEPA Documentation for SR A1A, Hallandale Beach, Broward County, Florida — Mr. Freedman provided environmental review and NEPA recommendations for LAP project along SR Alk Concerns inducted sea turtle - friendly lighting. Monroe County Pedestrian Path, Monroe County, Florida — Mr. Freedman provided permitting support services to Monroe County for a pedestrian path in Key Largo. This project inducted the design and permitting for the path, which ran adjacent to areas of tropical hardwood hammock, and a pedestrian bridge over Marvin D. Adam's Waterway. During the design phase for this project, Mr. Freedman mapped trees along the corridor and worked with designers to avoid impacting valuable trees, including trees constituting natural areas adjacent to the roadway and individual landscape trees that were likely to provide shade for pedestrians. Where possible, Mr. Freedman provided notes to instruct where roots and limbs could be trimmed back to provide access. He also conducted a benthic resources survey within the proposed bridge footprint over the Marvin D. Adam's Waterway. Using SCUBA and a team of divers and structural engineers, Mr. Freedman documented resources for use in acquiring project permits. Vizcaya Museum and Gardens, City of Miami, Miami -Dade County, Florida — This project involved a multi-clisciptinary landscape architecture and environmental restoration plan for the waterways and tidal pool within the museum's property, which balanced ecological function with creative landscape aesthetics, recreational functions and values, and improvements to water quality, and planting designs based on historic flora inventories, including mangroves, native hardwood hammock and coastal scrub species. Mr. Freedman served as the project manager for the construction administration portion of this project, including evaluating contractor qualifications and conducting compliance inspections. Imo., RFQ No. 14-07-021 Page 13.58 Ms. Locke has been providing professional environmental and engineering consulting services for over 26 years. During her career, she has worked in many facets of environmental consulting including environmental audits, assessment and remediation, stormwater design, sanitary sewer planning, environmental permitting, climate change impact evaluation, grant assistance, mitigation design, Brownfields, community involvement, and training. Ms. Locke has provided litigation support for the FDOT, Miami -Dade Aviation Department and private entities. She also serves as E Sciences' Corporate Quality Assurance Officer. Ms. Locke previously managed an environmental department for a large engineering firth in Miami -Dade County for over sic years. She is a former President of the South Florida Association of Environmental Professionals and served as a commission - appointee to the Broward County Brownfields Redevelopment Task Force and the City of Fort Lauderdale Community Advisory Board. Ms. Locke is a Board Member for the Smart Growth Partnership and is their liaison to the Broward County Metropolitan Planning Organization. She is also the current President -Elect for the Florida Brownfields Association and is served as Co -Chair for the FBA's 169, annual Conference in 2013. Nadia G. Locke, P.E. Associate / Senior Engineer Education B.S. Materials Science and Engineering, University of Florida, 1988 Professional Licenses I Certifications Professional Engineer. FL -58676 LEED Green Associate Certified FDEP Stormwater, Erosion and Sedimentation Control inspector and Instructor OSHA 40 Hour HAZWOPER / 8 Hour Site 1 Supervisor NAUUPADI Advanced Open Water Diver Years of Experience 26 Project Experience General Environmental Engineering Services, City of North Miami Beach, Miami -Dade County, Florida — Ms. Locke ® provides on -going environmental support to the City of North Miami Beach under E Sciences' general environmental engineering services contract. She was the engineer of record for the City's largest environmental cleanup project, Taylor Park, and has conducted several Phase I ESAs for the City. Ms. Locke held community meetings and has presented at CRA and City Council meetings. Taylor Park, City of North Miami Beach, Miami -Dade County, Florida — Taylor Park has been slated for redevelopment since 1999, when the FDEP had their Brownfields contractor conduct a Brownfields Assessment of the site. The assessment revealed metals and petroleum in the soil and metals in the groundwater. In 2005, assessment activities revealed the presence of buried solid waste on most of the 21.8 -acre property. Since that time, environmental issues have continued to restrict and complicate redevelopment efforts for the property. The property is currently occupied by an inactive ball field, an operating daycare facility, vacant land and a lake. Ms. Locke was the engineer of record and project manager for the assessment and conceptual remediation design for the property. The remediation planning was closely coordinated with the community desires, the City's needs and the park master planners to ensure a solution to remedy the environmental issues in conjunction with all of the stakeholder needs. She represented the City in two meetings with residents and other public meetings. Greynolds Park Renovations, Preliminary Evaluation Report, North Miami Beach, Miami -Dade County, Florida — This park is currently owned by Miami -Dade County and is used as a recreational park housing a variety of amenities, including a man -made lagoon and bird rookery. The intended hydrologic function of the park was based on historic tidal influences; however restricted flows to the rookery and lagoon have resulted in a degraded lagoon and substantially reduced bird population. This project was developed to identify issues that must be addressed to return the ecosystem to a more naturally productive state and improve the beneficial use of the park by enhancing and restoring the diminished hydrologic and biological function of the rookery. Ms. Locke provided the evaluation of the hydrologic function of the system and provided overall technical review of the reports prepared. ® General Environmental Engineering Services, City of Miami Beach, Miami -Dade County, Florida — Ms. Locke provides on -going services to the Support the City of Miami Beach under E Sciences' general environmental engineering contract. Under this contract, Ms. Locke is currently conducing a citywide sea level rise evaluation. She was also the engineer of record for RFQ No. 14 -07 -02 1 Page 13.59 ENGINEERING QnceS I ENVIRONMENTAL ECOLOGICAL ® Ms. Locke has been providing professional environmental and engineering consulting services for over 26 years. During her career, she has worked in many facets of environmental consulting including environmental audits, assessment and remediation, stormwater design, sanitary sewer planning, environmental permitting, climate change impact evaluation, grant assistance, mitigation design, Brownfields, community involvement, and training. Ms. Locke has provided litigation support for the FDOT, Miami -Dade Aviation Department and private entities. She also serves as E Sciences' Corporate Quality Assurance Officer. Ms. Locke previously managed an environmental department for a large engineering firth in Miami -Dade County for over sic years. She is a former President of the South Florida Association of Environmental Professionals and served as a commission - appointee to the Broward County Brownfields Redevelopment Task Force and the City of Fort Lauderdale Community Advisory Board. Ms. Locke is a Board Member for the Smart Growth Partnership and is their liaison to the Broward County Metropolitan Planning Organization. She is also the current President -Elect for the Florida Brownfields Association and is served as Co -Chair for the FBA's 169, annual Conference in 2013. Nadia G. Locke, P.E. Associate / Senior Engineer Education B.S. Materials Science and Engineering, University of Florida, 1988 Professional Licenses I Certifications Professional Engineer. FL -58676 LEED Green Associate Certified FDEP Stormwater, Erosion and Sedimentation Control inspector and Instructor OSHA 40 Hour HAZWOPER / 8 Hour Site 1 Supervisor NAUUPADI Advanced Open Water Diver Years of Experience 26 Project Experience General Environmental Engineering Services, City of North Miami Beach, Miami -Dade County, Florida — Ms. Locke ® provides on -going environmental support to the City of North Miami Beach under E Sciences' general environmental engineering services contract. She was the engineer of record for the City's largest environmental cleanup project, Taylor Park, and has conducted several Phase I ESAs for the City. Ms. Locke held community meetings and has presented at CRA and City Council meetings. Taylor Park, City of North Miami Beach, Miami -Dade County, Florida — Taylor Park has been slated for redevelopment since 1999, when the FDEP had their Brownfields contractor conduct a Brownfields Assessment of the site. The assessment revealed metals and petroleum in the soil and metals in the groundwater. In 2005, assessment activities revealed the presence of buried solid waste on most of the 21.8 -acre property. Since that time, environmental issues have continued to restrict and complicate redevelopment efforts for the property. The property is currently occupied by an inactive ball field, an operating daycare facility, vacant land and a lake. Ms. Locke was the engineer of record and project manager for the assessment and conceptual remediation design for the property. The remediation planning was closely coordinated with the community desires, the City's needs and the park master planners to ensure a solution to remedy the environmental issues in conjunction with all of the stakeholder needs. She represented the City in two meetings with residents and other public meetings. Greynolds Park Renovations, Preliminary Evaluation Report, North Miami Beach, Miami -Dade County, Florida — This park is currently owned by Miami -Dade County and is used as a recreational park housing a variety of amenities, including a man -made lagoon and bird rookery. The intended hydrologic function of the park was based on historic tidal influences; however restricted flows to the rookery and lagoon have resulted in a degraded lagoon and substantially reduced bird population. This project was developed to identify issues that must be addressed to return the ecosystem to a more naturally productive state and improve the beneficial use of the park by enhancing and restoring the diminished hydrologic and biological function of the rookery. Ms. Locke provided the evaluation of the hydrologic function of the system and provided overall technical review of the reports prepared. ® General Environmental Engineering Services, City of Miami Beach, Miami -Dade County, Florida — Ms. Locke provides on -going services to the Support the City of Miami Beach under E Sciences' general environmental engineering contract. Under this contract, Ms. Locke is currently conducing a citywide sea level rise evaluation. She was also the engineer of record for RFQ No. 14 -07 -02 1 Page 13.59 Nadia G. Locke, P.E. ® Spill Prevention Control and Countermeasure Plans (SPCCs) for twelve facilities throughout Miami Beach, and for engineering controls being negotiated with Miami -Dade County for regulatory closure of a solid waste facility. Facilities included pump stations, fire stations, public works yard, Miami Beach Golf Club and the Convention Center. Continuing Contract for General Environmental Engineering Services, City of Fort Lauderdale, Broward County, Florida — Ms. Locke is the contract manager for this continuing services contract for general environmental engineering consulting services for the City of Fort Lauderdale. Services conducted to date include emergency response during construction of a fire station; Phase I and Phase II ESAs / opinion of post landfill closure costs; endangered species surveys; burrowing owl permitting and relocation; benthic (seagrass) surveys; and indoor air quality / asbestos surveys. Some services have been provided to assist in ensuring environmental compliance for LAP projects. Sistrunk Boulevard Streetscape and Enhancement, City of Fort Lauderdale, Broward County, Florida — Originally slated as a stimulus project where funds were being disbursed through FDOT District Four, Ms. Locke conducted a Level 2 assessment of a 1.25 -mile corridor streetscape enhancement project located in the heart of the City of Fort Lauderdale CRA. Testing included Maintenance of Traffic, private utility location and collection of 36 soil and groundwater samples for laboratory analysis. Data was compiled and reported, and environmental notes/bid specification language was developed for bidding purposes. Ms. Locke also engaged the CRA in avoidance and minimization considerations and assisted the CRA with managing risks associated with environmental issues during construction. Pre - Demolition Asbestos Surveys for Low Level Bridges, City of Fort Lauderdale — Ms. Locke was the project manager for asbestos surveys on three bridges in Fort Lauderdale. The survey scope and reports were coordinated with FDOT District Four PLUM Department staff in order to satisfy FDOT requirements and project needs, as FDOT was providing funding for the demolition and reconstruction of these bridges. ® Pompano Beach Community Redevelopment Agency Continuing Contract for Environmental Engineering Services, City of Pompano Beach, Broward County, Florida — Ms. Locke is the contract manager for E Sciences' continuing services contract with the Pompano Beach CRA. Through this contract, E Sciences conducted Phase I and II Environmental Site Assessments for several parcels in preparation for the CRA's redevelopment planning. Ms. Locke is working with the CRA to consider options on how to safely manage construction on a solid waste disposal site and is preparing environmental documentation to satisfy NEPA on a LAP project. E Environmental Review and Permitting for LAP Project for NW 361" Avenue Pedestrian Enhancement Project, Pompano Beach, Florida — Ms. Locke is the project manager for conducting an environmental screening memo and environmental permitting for the this FDOT- funded bicycle and pedestrian enhancement project. As part of the review, E Sciences is preparing the environmental notes to be included in the constructability. Environmental Review for LAP Project for Martin Luther King, Jr. Avenue, Pompano Beach, Florida — Ms. Locke is the project manager for conducting an environmental screening memo for the this FDOT- funded roadway improvement project for the City of Pompano Beach. This project is part of a roadway improvement for a corridor that extends beyond the City's boundaries and is known as the Education Corridor. As part of the review, E Sciences prepared the environmental notes to be included in the constructability plans. River Oaks Preserve Storrnwater Park, City of Fort Lauderdale, Broward County, Florida — The purpose of the project is to create a passive stormwater park with wetland features to relieve Flooding in the River Oaks neighborhood and provide recreational use for local residents. Ms. Locke provided engineering support for the wetland delineation and tree survey, master site planning, and permitting for this stormwater park. She also assisted with the development of a summary of funding and grant opportunities for the project. The park will be preserving and enhancing existing forested wetlands on site and restoring herbaceous wetlands to a stormwater pond /filter marsh community that will alleviate flooding in the River Oaks neighborhood. RFQ No. 14 -07 -02 1 Page 13.60 ENGINEERING Q�nces i ENVIRONMENTAL Patricia L. Gertenbach, P.G. ® ECOLOGICAL Senior Associate Ms. Gertenbach has over 22 years of environmental consulting experience, including 17 years in South Florida. She opened the E Sciences Fort Education Lauderdale office in April 2002, and presently is a Senior Associate providing B.S., Geology, West Georgia College, 1991, contract management, QA/QC and technical leadership on a variety of projects Magna Cum Laude and contracts. She has managed and/or provided technical support on large Professional Licenses / Certifications contracts with multiple task orders for a number of public clients including the Professional Geologist: FL -2037, GA -1444 FDOT, FDEP, Broward County, SFWMD, Miami -Dade County Monroe LEEDGreen Assodate County, numerous municipalities in South Florida, U.S. Department of Defense (Army and Air Force), National Park Service and FWS in Florida, Georgia, PADI – Advanced Open Water Diver Kansas, Ohio, Virginia, Puerto Rico and New York. Her experience in the FWC Certified Manatee Observer private sector includes industrial and commercial facilities, mining operations, Hydric Soils Workshop developers, and law fines. Through these projects she has gained experience SFWMD UMAM Workshop in agency coordination; public meetings; contamination assessments (Phase I USACE Wetlands Delineation and and II) and remediation that consider both ecological and human health risks in a variety of media for a variety of constituents; regulatory compliance; principal Management Training author and/or reviewer for NEPA and FDOT PD &E Studies and associated OSHA 40 Hour HAZWOPER/8 Hour Site documents; extensive monitoring, sampling, disposal and documentation of Supervisor contaminated and/or hazardous substances; extensive interpretation, Certified FDEP Stornwater, Erosion and communication and recommendations to staff and clients of assessment Sedimentation Control Inspector and results; installation, development and sampling of hundreds of groundwater I Instructor monitoring wells and piezometers; NPDES permit implementation; GIS; aquifer analyses; water quality studies; environmental impact reviews/phase reviews; Years of Experience 22 preparation, review, and/or QA/QC of numerous ecological, environmental and water quality documents; Underground Storage Tank/Aboveground Storage Tank removalfinstailation oversight and report ® preparation; geotechnical investigations; database development; geologic assessments; and geophysical surveys. Ms. Gertenbach uses this broad background and her project management skills to provide quality driven, technically sound solutions that meet the client's needs in an efficient and cost effective manner. Project Experience Miscellaneous Permitting, FDOT District Six, Florida — As project manager, Ms. Gertenbach provided permit support for various projects and permits including DERM Class I and Class IV permits, ERPs, benthic surveys, manatee observations, wetland delineations, preliminary wetlands and environmental assessment of potential greenways, and development of a permit tracking system and a training CD-ROM for teaching scientists how to read road construction plans. General Environmental Coordination & Support for Florida Keys Overseas Heritage Trail, Monroe County, Florida — As project manager, Ms. Gertenbach provided environmental coordination and technical support to FDEP for permits, mitigation, and coordination with SFWMD, FDOT and local municipalities involved with the construction of the 1015-mile pedestrian - bicycle path to be completed from Key Largo to Key West utilizing 23 of the historic Flagler Railroad Bridges. Coordination included providing NEPA documentation to FDOT for each for each segment. Indian Key Fill Bike Trail, Islamorada, Florida — As project manager for this project, Ms. Gertenbach provided management and technical support for a Stormwater Demonstration Projectibicycle path upgrade for Islamorada. Services included construction engineering inspections and assistance with negations with SFWMD. She collaborated with FDOT and SFWMD to obtain permit modification for changes in design mid - stream that warranted change from Noticed General to Standard General Permit; developed a fast -track mitigation plan for contractor to minimize impacts to adjacent wetlands; assisted the municipality with implementation of the mitigation plan and with fines negotiations with SFWMD; performed biological assessments; and submitted the final turbidity monitoring report. Canal Assessment Report, Islamorada, Florida — As project manager, Ms. Gertenbach worked closely with the Village of Islands, Islamorada public works department to identify canal(s) for water quality improvement projects by reviewing available data ® to evaluate the best candidate canals based on need and a cost- benefit analysis. The review included summarizing water quality data that had been collected as part of Islamorada's monitoring program, analyzing data for trends, and examining possible treatment technologies. She collaborated with state and local agencies to identify permit requirements for water quality RFQ No. 14-07-021 Page 13.61 Patricia L. Gertenbach, P.G. ® improvement treatment technologies. As part of this project, Ms. Gertenbach presented findings to the Islamorada Village Council, and participated in a presentation to local high school science students demonstrating how their volunteer efforts collecting water quality samples were used by the municipality to help with public works projects. Key West City Electric System (CES), Transmission System Construction Oversight, lower Keys, Florida — Ms. Gertenbach provided permit compliance monitoring, project management and technical support to CES during construction of an electrical transmission system that traversed wetlands, mangrove fringe and seagrass beds in the Lower Keys. Tasks included collaboration with USACE and FDEP; construction oversight and documentation that included monitoring of wetland impact areas prior to, during, and following construction; working with construction crews to reduce wetland impacts at construction and staging areas; ensuring all permit conditions were met; identifying exotic vegetation for maintenance crews; and producing monitoring reports for FDEP. No violations occurred though the project entailed extensive construction in sensitive communities. Post - construction recovery was accepted by FDEP in the three -year negotiated time frame. Monroe County Residential Canal Inventory and Assessment, Monroe County, Florida — Developed comprehensive GIS database of residential canals in Monroe County and used database to categorize canals by parameters such as size, depth, configuration, distance from open water, orientation, and land use. Collected data from, and collaborated with, numerous agencies, municipalities, homeowners and other stakeholders in the Keys. Used the categorization to recommend various treatment technologies. Performed a case study on the effectiveness of various treatment technologies employed in one community to address water quality issues over a period of approximately 20 years. The GIS database is used by numerous agencies. Big Coppht Stornwater/Xeriscape Engineering Services, Monroe County, Florida – As Project Manager, Ms. Gertenbach provided Monroe County supplemental design for an FDOT road - widening project on Big Coppitt Key that was going to impact an existing bike path. Monroe County wanted to use the opportunity to correct design flaws in the path that had become apparent over the years. However, due to budget constraints, FDOT was not able to design the path with the upgrades that the County identified, such as reducing the width of the path and incorporating meanders. The E Sciences Team coordinated with the FDOT design engineers throughout the design process, revising the bike path and landscaping as changes were made to the ® stornwater swales. Monroe County's desired upgrades were successfully incorporated into the plans, and were included in the final construction. Vizcaya Gardens, City of Miami, Miami -Dade County, Florida — Ms. Gertenbach provided quality assurance on this restoration project at the prestigious Vizcaya Gardens. E Sciences' team of landscape architects, engineers and scientists worked together to develop restoration plans for two areas in the gardens: the hardwood hammock and the south canal restoration. The hammock had been damaged through the years by storms, including hurricanes, which weakened trees and allowed infestation by exotic invasive plants. E Sciences developed a comprehensive plan for removing invasive species and replanting natives that blended seamlessly with the well-established gardens. For the south canal restoration, E Sciences prepared design plans and applied for a Class I Permit from Miami -Dade County Permitting, Environment and Regulatory Affairs, a permit exemption from FDEP and a Letter of Permission (LOP) from USACE to conduct maintenance dredging activities involving the removal of approximately 1,410 cubic yards of silt and sediments from the bottom of the canal. The objective of this project is to enhance and restore lost hydrologic and biological functions to the canal. E Sciences worked closely with the regulatory community to restore the canal while protecting the mangroves that had encroached into the waterway. E Sciences also developed long -term stream-mangrove maintenance solutions. Alternative Lighting Design Standards for Roadways in Coastal Areas, South Florida — As project manager, Ms. Gertenbach worked closely with FDOT District Four personnel, lighting engineers and regulatory agencies to develop alterative lighting design standards for roadways in coastal areas adjacent to sea turtle nesting beaches. Development of standards will provide lighting engineers alterative designs that can be used to reduce or eliminate light that would otherwise trespass onto beaches, and possibly disrupt sea turtles' nesting activities. The standards will also likely help architects and engineers working on a variety of projects in other ecologically sensitive areas become aware of the alterative lighting designs available. Work on this project has lead to a number of related projects including: retrofitting lights along SR A1A in Broward County with sea turtle friendly fights and /or shields; design and installation of signs along and leading to SR A1A in Broward County informing public of reduced lighting during sea turtle nesting season; and participation in a number of community activities educating the public about sea turtles, the effect lighting can have on their nesting activities, and successful alterative lighting projects implemented by FDOT (ex: SR AIA in Boca Raton). I« .. RFQ No. 14-07-021 Page 13.62 Eduardo M. Suarez, PSM President ® Areas of Expertise: a� Project Management / Boundary Surv1 I/Route Surveying /Roadway Desif {{Surveys / Control Surveys /Topograph Surveys / FEMA Elevation Certificates joie:.... Ll ional Affiliations: Surveying & Mapping Society Dade College, Miami FL ering Studies, A.S. 1993 Profile: Eduardo Suarez has been surveying in South Florida for the last 28 years. Beginning in 1985 to 2001 he worked for Manuel G. Vera and Associates and Miami -Dade County. Licensed in 2001 he established his own firm. CR-er the last 12 years his firm has surveyed as a Prime or sub - consultant for the following entities: Pillage of Pinecrest, Florida Department of Transportation, \Gami -Dade County, City of Dfiami, Cir of Dfiami Beach, City of Coral Gables, Village of Key Biscayne, Village of Palmetto Bap, Town of Cuder Bav, City of Homestead, City of Doral, Miami Shores, North Miami, North Miami Beach and F1 Portal. Mr. Suarez brings a varied skill set along with experience that allows him to provide excellent project management. Project Experience: Lummus Corridor Roadway and Drainage Improvements A &P Consulting Transportation Engineers (APCTE} Longitude performed and prepared 3 miles of Topographic Survey in the City of Miami Beach from right of way to right of way for design and future construction. Longitude provided all above ground improvements, cross section elevations and utility information from right -of -way to right -of -way within the survey limits. City of Miami Beach Capital Improvements Project Neighborhood No. 7 Nautilus: (9 miles) of Topographic Survey established vertical and horizontal control for the entire corridor. All above ground improvements were collected within the survey limits, cross sections were taken at 50400t intervals, a digital terrain model (DTM) was created /utility information was provided, a Tree Survey, Right of way lines and centerlines were field verified and shown graphically. Nikki Beach, Miami Beach, Fl- Julio Menache- Milian, Swain, & Associates, Inc. - Longitude Performed and Prepared a Topographic Survey Showed all improvements from Right-of-Way to Right-of-Way, established Horizontal and Vertical Control for future construction, cross sections (spot elevations), all utility information provided, tree descriptions. Gilbert Samson Oceanfront Park -Sunny Isles (Samson Park) - Javier Rodriguez, P.E. -RJ Behar & Company, Inc: Longitude Performed and Performed a Boundary and Topographic Survey; Established vertical and horizontal control for future construction; Showed all Improvements; Located all Utilities; Provided Tree Survey; Cross sections (spot elevations). West 63rd Street, Miami Beach, Fl - Julio Menache- Milian, Swain, & Associates- Longitude Performed and Prepared a Topographic Survey; Showed all improvements from Right-of-Way to Right -of -Way; Established Horizontal and Vertical Control for future construction; Cross sections (spot elevations); All utility information provided; Tree descriptions North Beach Elementary School - Eleane Navarro - Stantec- 4100 Prarie Avenue, Miami Beach, Fl- Longitude Performed and Prepared a Boundary and Topographic Survey. Established Property lines and Right-of-Way; established horizontal and vertical controls; Located all Utilities; Performed Tree Survey; Found Cross Sections (Sot Elevations). Along Euclid Avenue from Lincoln Lane Road to Lincoln Road, Miami Beach, Fl- Chen -Moore & Associates- Longitude Performed and Prepared a Topographic Survey, as well as a Sketch and Legal. Survey- Topographic Survey; Showed all improvements from Right -of -Way to Right -of -Way; Established Horizontal and Vertical Control for future construction. Cross sections (spot elevations); Provided all Utility information provided; Provided Tree Survey. Longitude also provided sketches of the job limits for legal use. PalmerTrinity Private School, Inc. - Jose Chao-7900 SW 176`" Street, Palmetto Bay, FU Longitude Performed and Prepared an As -Built Survey, in addition to a Topographic Survey with Elevations for entire campus of Palmer Trinity School and East along SW 184`h Street and the Intersection of 82nd Avenue for a % mile. All improvements were shown, located buildings, parking RFQ No. 14 -07 -021 Page 13.63 L �L klllwm lots, elevations, and located all utilities and tree information. Continued to show all improvements from Right -of -Way to Right-of- Way, including all catch basins, manholes, sewer valves, meter valves, sizes and directions of pipes, and invert elevations, including all tree information. Town of Cutler Bay- Old Cutler Road Roadway Improvements- Beginning SW 184 Street and Along Old Cutler Road for z �5 miles - Stantec - Sean Compel - Longitude Performed and Prepared 2 1/2 miles of Topographic Survey in the Town of Cutler Bay from Right -of -Way to Right -of -Way for design and future construction. Miami -Dade Water & Sewer Department Alexander Orr Jr. Water Treatment Plant: As -Built Drawings Development & Hydrochlorite Solution Generation System As -Built Survey performed. Potable Water System Improvements Village of Pinecrest: Longitude performed and prepared 14 miles of Topographic Survey along various public streets within the Village of Pinecrest. The purpose of the survey was to establish vertical and horizontal control for the design of a water main to complete the potable water system of the Village. Longitude provided improvements, cross section elevations and utility information from right -of -way to right-of-way. Miami -Dade Water & Sewer Department(WASD) 72- Inch Raw Water Pipeline (Eo6WASD -o6): (5 miles) of Topographic Survey along NW 58 Street between NW 72 Avenue and the Florida Turnpike- Homestead Extension; Established vertical and horizontal control for future construction; All utility information provided; Cross sections (spot elevations); All improvements shown from right -of -way to right -of -way. Florida 16" Reclaim Waterline Extension- Lyons Road - Coconut Creek- R.J. Behar & Company, Inc.-Javier Rodriguez, P.E. Topographic Survey; Showed all improvements from Right-of-Way to Right -of -way; Established Horizontal and Vertical Control for future construction; Cross sections (spot elevations); All utility information ®provided; Tree descriptions (Served as Principal -In- Charge). Eduardo M. Suarez, PSM Page 2 United States Dept. of the Interior, National Park Services, Everglades National Park, FL, Replace two (2) Failed Plugs (Dames at Cape Sable (East of Cape and Homestead Dams; EVER - 152464 with the United State Department of the Interior; National Park Service; Established Horizontal and Vertical Control Points and laid out work limits at the East Cape Canal and Homestead Canal Dam locations and confirmed the proposed locations at all topographic, construction, or other items affecting the work / Established line and grade and installed offsets of the proposed steel sheeting structures at the East Cape Canal Dam locations / Installed temporary markers for the wood channel marker piling in Lake Ingraham / Periodic on- site survey as needed, including but not limited to layout of the proposed mooring piles, walkway, gangway, and final grade elevations. E07- WASD -07A Design of Distribution of Pipeline for Reclaimed Water System from Central District Wastewater Treatment Plant to Key Biscayne (5 miles) including the Bear Cut Channel Survey: (5 miles) Survey- Topographic Survey; Showed all improvements from Right -of -Way to Right-of-Way; Established Horizontal and Vertical Control for future construction. Cross sections (spot elevations); Provided all Utility information provided; Provided Tree Survey. Miami -Dade County, Land Surveying Services for Wharf 1, located at the Port of Miami, FL: Provided Topographic Survey and prepared a Map of Topographic; Surveyed existing ground under existing Wharf I, which is about 850' long by 85' wide. The topographic survey was to develop a TIN file of the ground surface under the wharf and extend water -ward about 30' beyond the face of the wharf. The survey also included the location of 15 -20 geotechnical borings on the top side of the wharf and the approximate location Of 5 sections of existing rip -rap located within the project area. The topographic survey entailed task; Established Horizontal Control relative to NAD83 /2007 and Vertical Control relative to NAVD88; Control stations to be established at +/- l000' intervals and placed in locations not subject to construction and able to be verified; Utilized during construction. Created a grid based on the location of all existing piles supporting the wharf as necessary to delineate existing ground conditions. The same methodologies were used to determine horizontal location and elevations for geotechnical borings and limits of rip -rap. RFQ No. 14-07-021 Page 13.64 u Dhuruva (Dru) Badri, P.E. Senior Engineer/Department Manager Education • MS in Geotechnical Engineering, University of Florida, 2003 • BE in Civil Engineering, National Institute of Technology Karnataka, India, 2001 Year started with PSI: 2003 Professional Experience Mr. Badri has close to I years of experience in the area of foundation design and construction operations. He has been involved in numerous projects for the public and private sectors. Mr. Badri's experience includes coordination, monitoring and evaluation of subsurface explorations, laboratory studies, construction operations and geotechnical report preparation. Mr. Badri has been working alongside the FDOT District Materials Office (IV and VI) since 2003 and is intimately familiar with their requirments. Mr. Badri has been involved with over 200 task work order's (TWO) covering a wide array of geotechnical engineering activities. These activities include field, laboratory and engineering assignments relating to bridges, miscellaneous structures, roadway, evaluation of distress, drainage studies and providing in -house staff support to the District Materials Office. Within District VI alone, Mr. Badri has been involved with work along various state roads including S.R. 5, 7, 9, 90, 25, 93, 823, 826, 852, 932, 959, AIA and US -l. Since 2003, Mr. Badri has been serving the Department (PB America, owner's representative) on the Port of Miami Tunnel project which is one of FDOT's largest and most unique undertakings. As a part of his MS degree curriculum at the University of Florida, Mr. Badri performed extensive research on the axial capacity of large diameter cylindrical piles. He has been responsible for analysis and recommendations related to the design and construction of foundation elements on projects, such as Roadways, Schools, telecommunication towers, and industrial developments. He has also been involved in several projects involving problematic soil conditions, where in ground improvement techniques such as vibro - replacement, vibro- compaction, injection grouting and CSV stabilization were used. Mr. Badri has also extensive experience with FDOT Standards and has worked with the FDOT in numerous geotechnical studies for roadways, bridges, retaining structures and walls. REPRESENTATIVE PROJECTS Port of Miami Tunnel (SR AIA), Preliminary Feasibility Study, Miami -Dade County, Florida (2 miles) Involved in the preparation of numerous Geotechnical Data Reports which compiled the results of the field and laboratory tests associated with the geotechnical works on land and in water. The field work involved extensive permitting and coordination with various government and environmental entities. The field work involved the use of methodologies such as SPT, rock coring, permeability testing, CPT, Seismic -CPT etc. Due to time restrictions from cruise operations, field work sometimes required working on 24 hour operation. Role: Project Engineer Dates: August 2003 to on -going ® Client: Mr. Steve Dusseault, P.E., P.G., PB America, 305 -514 -3122 N2; RFQ No. 14 -07 -021 Page 13.65 CJ Dhuruva (Dru) Badri, P.E. Senior Engineer /Department Manager I -95 (SR 9) Roadway Widening in Indian River County. Florida (10 miles) The project involved performing geotechnical work for roadway widening, bridge widening, ponds and studies relating to noise walls. Role: Project Engineer Dates: September 2008 to March 2009 Client: Mr. Terrence Walters, FDOT DMO, 954- 677 -7019 SR 838 Bridge Replacement over Little River, Broward County, Florida (1 mile) The project involves the design of a new bridge, a temporary detour bridge, sheet piles, permanent bulkhead, gravity wall and roadway reconstruction. We have been working alongside FDOT District IV structures group to finalize the design documents. Role: Project Manager Dates: February 2009 to on -going Client: Mr. Ramon Otero, P.E., FDOT District IV, 954 - 7774162 SR 251US 27 ITS/DMS Improvements, Broward and Palm Beach Counties, Florida (5 Miles) The project involves the construction of ITS /DMS structures along SR 25 in Broward and Palm Beach Counties, Florida. Role: Project Manager Dates: December 2011 to February 2012 Client: Mr. Julio Delgado, P.E., FDOT District IV, 954- 7774390 ® I -75 (SR 93) Managed Lanes, Miami -Dade and Broward County, Florida (10 miles) The project involved developing geotechnical data reports the drainage and roadway aspects of the 1 -75 Managed Lanes project in Miami -Dade and Broward Counties. The work involved undertaking field work in soft/unstable ground conditions. Role: Project Manager Dates: October 2011 to March 2012 Client: Mr. David Y. Chiu, P.E., FDOT DMO/ Mr. Terrence Walters, FDOT DMO, 954- 677 -7019 SR 80 from SR 15 to Railroad Tracks, Palm Beach County, Florida (3.5 miles) The project involved roadway widening and milling along a 3.5 mile section of roadway in Palm Beach County, Florida. The biggest challenge on this project was the fact that the project alignment consisted of deep highly organic soils with portions of it above the water table. Role: Project Manager Dates: August 2011 to January, 2012 Client: Mr. Scott Horlander, P.E., Protean Design Group, Inc. 407 - 246 -0044 SR 15 from E. 5`h Street to SR 700, Palm Beach County, Florida (4 miles) The project involved roadway widening and milling along a 4 mile section of roadway in Palm Beach County, Florida. The biggest challenge on this project was the fact that the project alignment consisted of deep highly organic soils with portions of it above the water table. Role: Project Manager Dates: May 2009 to June 2009 Client: Mr. David Y. Chiu, P.E., FDOT DMO 954- 677- 7038/Mr. Thuc Le, P.E., FDOT, 954- 7774552 ® ��% RFQ No. 14 -07 -02 1 Page 13.66 11 Paul Passe, P.E., CPM Chief Engineer Education Bachelor of Science, Civil Engineering, University of Wisconsin - Platteville, 1978 Year started with PSI: 2001 Years' experience with other firms: 23 Professional Experience Mr. Passe has over 35 years of experience in the field of geotechnical engineering and materials testing, 13 of which were spent working directly with the Florida Department of Transportation. He spent four of those years as District Geotechnical Engineer, responsible for assignment of project managers for design and construction, and the other eight as the State Geotechnical Engineer, acting as Senior Review and troubleshooter for projects state wide as well as provided guidance and leadership for geotechnical policy and procedures for the FDOT. He has participated in over 100 various geotechnical and construction projects regarding, roads, bridges, buildings and sinkholes all over the State of Florida. He has also done numerous presentations for the FDOT at conferences and seminars, and helped develop geotechnical- related specifications and training courses. He served on the Geotechnical Institute, Transportation Research Board and National Cooperative Highway Research Program task forces, committees and panels. REPRESENTATIVE PROJECTS Representative DOT Project Experience ® As the State Geotechnical Engineer for the Florida Department of Transportation in Tallahassee, Mr. Passe was responsible for planning, directing and coordinating the state geotechnical unit for providing statewide geotechnical design procedures and guidelines, writing construction specifications and handling of geotechnical research contracts. He was also responsible for the review of geotechnical engineering investigations and reports from both in -house and consultant forces for all transportation phases — design, construction and maintenance. Since joining PSI, Mr. Passe has been involved in determining design criteria for the high -speed railroad, provided statewide training for consultant engineering inspectors, state inspectors at construction workshops. He has been responsible for detailing specifications, setting product pile lengths and providing driving criteria using Wave Equation Analysis Program, Pile Driving Analyzer, CAPWAP® and for verification of testing on design build projects. Mr. Passe assists the FDOT Districts with geotechnical problems, including ground vibration monitoring, pile driving analysis and other engineering instrumentation, testing and monitoring. Mr. Passe was involved in putting together the Pile Driving Inspector and Drilled Shaft Inspector's training course and provides training for MSE Wall Inspectors for FDOT. Recently, Mr. Passe developed the FDOT State -wide procedures for evaluating structures with unknown foundations. In addition to his work with the FDOT, Mr. Passe works with many different State and Federal entities providing them information and assistance in the field of geotechnical engineering. ® Port of Miami Tunnel (SR AIA), Preliminary Feasibility Study, Miami -Dade County, Florida (2 miles) RFO No. 14-07-021 Page 13.67 Paul Passe, P.E., CPM Chief Engineer Involved in the preparation of numerous Geotechnical Data Reports which compiled the results of the field and laboratory tests associated with the geotechnical works on land and in water. The field work involved extensive permitting and coordination with various government and environmental entities. The field work involved the use of methodologies such as SPT, rock coring, permeability testing, CPT, Seismic -CPT etc. Due to time restrictions from cruise operations, field work sometimes required working on 24 hour operation. Role: Project Engineer Dates: August 2003 to on -going Client: Mr. Steve Dusseault, P.E., P.G., PB America, 305 -514 -3122 I -95 (SR 9) Roadway Widening in Indian River County. Florida (10 miles) The project involved performing geotechnical work for roadway widening, bridge widening, ponds and studies relating to noise wall. Role: Project Engineer Dates: September 2008 to March 2009 Client: Mr. Terrence Walters, FDOT DMO, 954- 677 -7019 I -10 over Escambia Bay in Pensacola, Florida Part of the CEI team for FDOT District 3; Responsibilities included review of geotechnical data/recommendations and verification testing of piling for bridge replacements. Role: Chief Geotechnical Engineer Dates: 06/05 — 10/08 ® Client: Bryan Estock, PE, Ph: (850) 777 -8761 Design - Build: I -95 Roadway Widening in Brevard County, Florida Subsurface investigation, laboratory- testing program pile, foundation design, engineering analysis, report preparation and analysis of PDA test data and issuance of pile certification documents. Project included a bridge widening over Eau Gallie Blvd. and Lake Washington Road, bridge over US -17/92 (SR 500), Pineda Causeway Interchange Over 1 -95 and Wickham Road Bridge. Role: Chief Geotechnical Engineer Dates: 02/08 — 03/09 Client: Sean Moore, PE, Ph: (8 13) 977 -3434 SR -8A (I- 110) /SR -8 (I -10) East of Old Palofax Road to East of SR -291 - Escambia County, Florida Responsible for the subsurface investigation, laboratory- testing program pile, foundation design, engineering analysis, report preparation and analysis of PDA test data and issuance of pile certification documents. Role: Chief Geotechnical Engineer Dates: 05/03 — 10/08 Client: Fred Brown, PE, Ph: (850) 477 -7485 Nei RFQ No. 14 -07 -021 Page 13.68 Continuing Professional Services for Architectural, Landscape Architectural, Engineering and Land Surveying Firm Only (CCNA) - RFQ No. 14 -07 -02 0 Section 4 - Approach / Methodology Project management approach RJ Behar has been providing the City of Sunny Isles Beach with professional engineering services for the past two years. During this period of time, we have demonstrated a commitment to meet schedules, provide quality services and provide proactive management on all of the work assigned to date. This includes: • Design Services of Lehman Causeway Wall - RJ Behar completed this assignment ahead of schedule and reacted quickly when the City discovered the need to relocate the wall. This included the need to mitigate unforeseen utilities during construction and provide quick and cost effective alternate solutions during the construction of the wall. • Design Build Criteria Package for Gateway Park Pedestrian Bridge - RJ Behar completed this assign- ment ahead of schedule. The assignment required coordination with the FDOT, as well as other agencies. • Gilbert Samsun Park - We are providing civil engineering services, as well as, coordinating several disciplines for this very high profile park project, which includes coordinating landscape architecture, structural engineering, surveying, architecture and geotechnical engineering services. At RJ Behar, we understand that repeat business is the key to a successful company and as such we strive to provide full customer satisfaction. Our organization places the upmost importance on the Project Manager to deliver quality services, on time and within budget. The Project Manager is the key to a successful project; he is the "CEO" for the technical elements related to the project. Our project management philosophy is to be proactive. This simply means: to search out problems and solve them before they can happen. Our Project Manager, Mr. Javier Rodriguez, P.E., has been involved in numerous design projects over the past 26 years. Our ® management philosophy is best summarized as follows: a. Staff (Personnel who will perform the work) : RJ Behar will commit highly competent and experienced professionals to this project. They will be provided the necessary resources and be held accountable for their results. For each firm in the team, we have established a point of contact for this contract that will start the coordination from each firm to develop the scope of services. L.1 Management of the Schedule — (On time) -_ = � - -� = -� = �;_ -i. _ i_ .�_- ...... -- - -_ - -_ The RJ Behar Project Manager is responsible for schedule control of i' _ - -- :_ __ _ _;� LL_ the project. Working with City Staff and key members of the =_ -` Project Team, Mr. Rodriguez will identify all discrete activities, resources and efforts required for each task, and prepare the project _ schedule. Inputs to the schedule will be activities, duration of each _— activity, predecessors and successors to each activity, efforts ® required to complete each activity, and personnel assigned to successfully complete each activity. �R.J.Behar RFQ No. 14 -07 -02 1 Page 14. 1 Continuing Professional Services for Architectural, Landscape Architectural, Engineering and Land Surveying Firm Only (CCNA) - RFQ No. 14 -07 -02 ® This process will result in a "Project Schedule" identifying activities, which are on the "critical path" as well as float time in other activities. This is particularly important because activities on the "critical path" cannot slip without adversely impacting the "Project Schedule ". Mr. Rodriguez will monitor all activities assuring the proper level of staffing to strictly adhere to the "Project Schedule." Team meetings will be held on a regular basis to review progress and assure compliance with the "Project Schedule." Meeting minutes and Progress Reports can be submitted to the City on a monthly basis. The schedule is developed to satisfy the City's need and is prepared at the time of scope preparation and negotiations. The schedule should satisfy the following parameters: The time frame should be as needed and agreed with the City's Project Manager. > It should include adequate time for each step taking advantage of parallel steps as much as possible. > It should include time for the revision of deliverables and approval by the City. > It should adequately consider permitting agencies review. > The time steps should be realistic based on project constraints. Meeting with Clients and Coordination All matters related to the project will be coordinated with the City's Project Manager. We will try to minimize the City's day - to-day involvement and can keep the Project Manager informed electronically (e- mail). This approach has proven very successful in ensuring quality service, customer satisfaction and prompt complaint resolution. Mr. Rodriguez will serve as our focal point of coordination and for providing timely responses and prompt follow up. He will be the link with the project team. ® > Between RJ Behar and the City RJ Behar we will keep the City's Project Manager well - informed of all project issues at all times. Recognizing that the City's Project Managers may be managing many projects at the same time, we will try to minimize the staff day - today involvement by; 1) obtaining needed information ourselves, 2) maximizing electronic information transfer (e- mail), 3) conference calls, and /or 4) prompt meeting minutes. We will schedule progress meetings as often as the City Project Manager desires. RJ Behar will schedule progress meetings as often as the City Project Manager desires. It is important to note that we propose a Kick -off meeting at the beginning of the task with the City's Project Manager, our key staff, and subconsultants required. This meeting will insure the start of the project on the right foot. The scope, work plan, schedules, and understanding of the task should be discussed and any major issues should be identified up- front. > Between RJ Behar and Subconsultants Another important aspect of coordination is between RJ Behar and its subconsultants. Again, we will make use of electronic transfer of information in order to maintain close communication ties throughout the project. It will be our sole responsibility to make sure that our subconsultants comply with their schedule and quality of their deliverable. A key to receiving quality work from subconsultants is to keep them informed. As the Prime Consultant, we will schedule work tasks to get the required data to our subconsultants as soon as possible. We will provide our team project schedules and all updates to that schedule. > Between RJ Behar and Utility Companies /Permitting Agencies ® RJ Behar will develop a distribution list for each utility company and permitting agency. Meeting with the permitting agencies will be held as soon as the concept is developed. Utility contacts will be made as soon as �R.J.Behar RFQ No. 14 -07 -02 1 Page 14. 2 `I LI E Continuing Professional Services for Architectural, Landscape Architectural, Engineering and Land Surveying Firm Only (CCNA) - RFQ No. 14 -07 -02 topographic features and right -of -way lines are plotted. Ongoing coordination will be maintained with all of the agencies. Between RJ Behar and Private Stakeholders RJ Behar will, through the City, coordinate with the private stakeholders involved. We will organize public meetings, one- on-one meetings, conference calls, preparing presentations, etc. We will make ourselves avail- able to provide the services that the City needs. On all public meetings we will keep minutes, or recordings as needed to document these meetings. Private IT'(,( MRSubeonsultants Figure 1. Project Coordination d. Communication RJ Behar recognizes the importance of communicating during the course of the project. As such, regular in- house meetings will be held to ensure coordination and quality control. We will provide the City with minutes of meetings within one week after the meeting is held. These will include minutes of meetings with all entities involved. e. Cost Control (within budget) RJ Behar utilizes spreadsheets and the sophisticated Advantage from DELTEK computer software to keep track of the project budgets. Regardless of the budget constraints of any project, RJ Behar has the commitment of completing every contracted project to the satisfaction of the client. RJ Behar utilizes management spreadsheets for control of each project, which are discussed in our weekly meetings. At these meetings, we go over the items that need to be 4 R.J.Behar RFQ No. 14 -07 -02 1 Page 14. 3 0 o. Continuing Professional Services for Architectural, Landscape Architectural, Engineering and Land Surveying Firm Only (CCNA) - RFQ No. 14 -07 -02 E E completed, the budget, and the staff needed to complete each item. Our company President presides over these meetings to insure each project and task is allocated the necessary resources. QUALITY CONTROL AND QUALITY ASSURANCE a. Quality Control (quality services) Project efforts can be ineffective and time consuming if accomplished incorrectly. Our proactive philosophy emphasizes the early resolution of project issues. An on -going quality control process goes a long way identifying these key issues early. RJ Behar will ensure the quality of its product. We strongly believe that we are solely accountable for the delivered product, including the quality of our sub - consultants' product. A synopsis of our quality program is outlined below. 1. QC Personnel An autonomous reviewer, who is completely independent from the design teams' staff, performs the review. The personnel chosen are highly experienced in the tasks they will be reviewing. Committing the appropriate staffing to the project is the most important quality assurance measure. The quality control team will be led by our project manager. 2. QC Reviews These are normally divided into three major areas: 1) engineering design review (criteria); 2) plans preparation /cross reference review; and 3) constructability review. Providing for these will assure the City the quality it is paying for. For the review process, RJ Behar has developed checklists of items that must be included on each type of project. 3. QC Process We will follow a process, which starts with the 1) design originator, 2) it is sent to a checker, 3) it goes back to the originator who reviews these and determines which comments are to be implemented, 4) The originator and checker meet to discuss the comments and come to an agreement on the implementation of the comments; 5) If they cannot come to an agreement the project manager will then make that determination; 6) Comments are implemented; and 7) Plans are back checked. All of these steps will require initials and dates by the individual(s) involved. (FCH�7011! QRIC UIR vFVGr.FR OVA ❑.„ o.a'x� o OFflGN [HEUiR 0MGMTOR 0 0 0 8 (HEfNFRIORIgN4i@ 0 nNUOOawFr.rs 4 R.J.Behar RFQ No. 14 -07 -02 1 Page 14. 4 Continuing Professional Services for Architectural, Landscape Architectural, Engineering and Land Surveying Firm Only (CCNA) - RFQ No. 14 -07 -02 ®OVERALL ORGANIZATION Our overall organization to complete projects in this contract is shown in our Organization Chart included in Section 3 of this proposal. The chart includes the personnel available and planned for this contract. It is summarized as follows (years of experience in parenthesis): Mr. Javier Rodriguez, PE (25) will be the project manager in charge of delivering and completion of tasks. He will be the main contact with the City as well as the lead engineer for Civil /Recreational Facilities. Mr. Robert Behar, PE (35) will be the Principal -In- Charge and will be an asset to this contract in terms of his overall experience and relations with agencies such as the FDOT. He is currently the president of the Florida Institute of Consulting Engineers. Mr. Juan Vazquez, PE, PH, BCEE (26) will be the lead engineer for stormwater and drainage, as well as water and sewer projects. Mr. David Romano, PE (16) will lead construction administration services and assist with cost estimating. Mr. Jerry Piccolo, PE (33) will assist with any miscellaneous structural designs such as outfalls, seawall repairs, bridge design and evaluations. Mr. Carlos Mazorra, PE (25) will be in charge of the roadway design. He is a former FDOT D6 employee and is current in all aspects of roadway, lighting, signing /markings, ADA, and traffic operations design. Mr. Eduardo M Suarez (28) is the President of Longitude Surveyors, LLC and will be in charge of all surveying ®and mapping needed on any project. Mr. Suarez has provided surveying and mapping services for over 28 years to various municipalities. Mr. Dhuruva (Dru) Badri, PE (11) from Professional Services Industries, Inc. will be the lead geotechnical engineer on this contract. Mr. Badri's experience includes coordination, monitoring and evaluation of subsurface explorations, laboratory studies, construction operations and geotechnical report preparation. Justin Freedman, MS (12), from E Sciences will serve as the lead environmental engineer for this contract. He specializes in municipal consulting and has provided plan review, landscape inspection, environmental assessments, expert witness, permitting, ordinance development, street tree inventory, canopy assessments, carbon sequestration analysis and wildlife permitting services to municipalities. ABILITY TO MEET TIMELINES AND DEADLINES We believe that the successful completion of a project is highly dependent on the experience of the staff assigned to the project. RJ Behar will commit the personnel necessary and monitor project progress to meet schedules. As previously stated, RJ Behar has the commitment of completing every contracted project to the satisfaction of the client. Our management spreadsheets assist us for control of each project and we discuss each project in our project management weekly meetings. At these meetings, we go over all the items that need to be completed, the budget, and the staff needed to complete each item. Our company President, who will also serve as Principal -In- Charge on this contract, presides over these meetings to insure each project and task is allocated the necessary resources. 11 qR.J.Behar RFQ No. 14 -07 -02 1 Page 14. 5 V 1 Continuing Professional Services for Architectural, Landscape Architectural, Engineering and Land Surveying Firm Only (CCNA) - RFQ No. 14 -07 -02 ®Our team has the ability to respond to numerous projects quickly and we have extensive experience in civil and environmental projects. RJ Behar has performed services similar to the ones requested in this solicitation for several of our clients. Responsiveness is the key to the success of these contracts. We have performed and are currently performing multi -task contracts for many of our clients. We are capable of accomplishing the work in the required time and have the capacity to start any assignment immediately after notice to proceed. We just recently completed hydrologic and hydraulic analyses and plans for the 1 -595 Improvement project. The project is a 1.2 billion dollar Public- Private - Partnership. The project was divided in ten segments. The design for each segment would normally be scheduled over a 3 year design period. We completed 95% of the work in a span of nine months, mostly working concurrently and had to coordinate design tasks with five major roadway designers located in offices in five different states and more than ten offices, and many other specialty consultants. At this time we are only working on post design services. All of our subconsultant team members will be available to augment our capabilities in order to meet schedules and match expertise to the work order requirements. Our objective is to provide the City of Sunny Isles Beach with high quality, timely professional services in support of its work program. RJ Behar is committed to be an extension of your staff and to °tailor fit" our services to provide specifically what the City desires. Our project manager will provide direction and be responsible to the City for the quality and timeliness of the work, whether it is provided by RJ Behar or by our specialty subconsultants. The RJ Behar Team pledges to be responsive and flexible in meeting the City's requirements and schedules, as well as committing all of our resources to achieve this goal. We have assembled a comprehensive team of ® experts who will be available to provide any service, from planning and design to construction inspection. All of the team members have expressed their commitment to this contract. 0 WORKLOAD DISTRIBUTION The following chart identifies the available staff capacity of our firm, and the projection of current commitments over the next one year period. The graph shows that we will be finishing our larger commitments within the next two to three months and will have available capacity for new assignments. BACKLOG ANALYSIS 5.5 5 AVAILABLE STAFF ^y a.s 4,715 HOURS S 4 3.5 CD O 3 2.5 V 2 `0a 1.5 m U 1 0.5 0 tl 2 3 4 5 7 8 9 10 11 12 August2014 2015 Months 4 R.J.Behar RFQ No. 14 -07 -02 1 Page 14. 6 MAYOR Richard J. Kaplan, Esq. VICE MAYOR M. Margaret Bates COMMISSIONERS and J. Benson, Jr., Ed.D. Howard Berger Ken Thurston CITY OF LAU D E M I L L Charles Far nda DEPUTY CITY MANAGER Desorae Giles -SmBh ASSISTANT CITY MANAGER Kennie Hobbs, Jr. CITY CLERK Andrea Anderson DEPARTMENT OF ENVIRONMENTAL & ENGINEERING SERVICES TO WHOM IT MAY CONCERN: Name of Firm to be Contacted: Cite of Lauderhill Address: 2101 NW 49° Avenue. Lauderhill_. FL 33313 Contact Person: Mr. J Martin Cala_, PE Phone Number: (954) 730 -2961 Project Performance Period: 06/2011 - 09/2012 Location of Project: City of Lauderhill, Florida Approximate Fee for Services: $65,601.00 Brief Description of the Services Performed for this Project: SR -7/US -441 Roadway Lighting and NW I I'h Pedestrian Lighting Improvements The City of Lauderhill proposed to construct pedestrian access to the new Central Broward Regional Park and the future Performing Arts Center and Library on A'pV Ilrh Place. The project scope included the installation of roadway lighting along SR -7 from 400' north of SR- 838 /Sunrise Boulevard to AIW 12rh Street, and decorative pedestrian lighting along NW llrh Place. Additional improvements included milling and resurfacing, installation of decorative stamped concrete and asphalt, lighting, landscaping, and street furniture. The installation of concrete sidewalk/pedesirian path connecting A'R' I Ph Place to the park facilities and the installation of decorative pavers, street furniture, and decorative crosswalks at the intersection of SR -7 /US -441 and NW II'h Place were also included. This was an FDOT Local Agency Program (LAP) Project. RJ Behar was assigned by the City of Lauderhill to perform design, quality assurance reviews of the plans, permitting and coordination with the respective agencies. RJ Behar also provided post design services of the project to ensure the improvements are constructed in accordance with the design. Project length: 0.45 miles Referenced Company: Mr. Javier Rodriguez, PE R. J. Behar & Company, Inc. 6861 SW 1960' Avenue. Suite 302 Pembroke Pines. Florida 33332 0, Mr. J. artiiie hi. PE City Engineer RFQ No. 14 -07 -02 5581 W. Oakland Park Blvd. • Lauderhill, FL 33313 • PH: 954.730.2960 • FAX: 954.730.4241 www.lauderhill-fl.gov pg. 5.1 0 Name of Firm to be Contacted: City of Doral Address: 8401 NW 53rd Terrace Dora[, Florida 33166 Contact Person: Mr. Jorge Gomez, PE Phone Number: (305) 593 -6725 Project Performance Period: 08/2013 — Ongoing Location of Project: Doral, Florida Approximate Fee for Services: $ 30,474.00 Brief Description of the Services Performed for this Project: NW 50th Street Bicycle/ Pedestrian Trail This project is for the design of approximately a half mile of bicycle /pedestrian trail adjacent to NW Se Street in the City of Doral in Miami Dade, Florida. The trail is composed of a ten foot asphalt path with ADA compliant crossings at several intersections. The project also includes pedestrian lighting. The design of the proposed signage required extensive coordination with Miami -Dade Engineering. The project also included heavy coordination with FP &L as the trail meanders through a transmission line easement. Additionally, the project was coordinated with the City's orborist to minimize impacts to landscaping along the corridor. Referenced Company: Jorge Gomez, P ief of Engineering Mr. Javier Rodriguez, PE R. J. Behar & Company, Inc. 6861 SW 196th Avenue, Suite 302 Pembroke Pines, Florida 33332 9 RFQ No. 14 -07 -02 pg 3401 Northwest 33rd Terrace • Doral, Florida 33166 • (305) 593.6725 wuwxiry-otdoralxotn 5.2 CENTRAL BROWARD WATER CONTROL DISTRICT 8020 STIRLING ROAD (DAVIE) HOLLYWOOD, FLORIDA 33024 www.centralbrowardwcd.org BOARD OF COMMISSIONERS TELEPHONE: (954) 432 -5110 FAX: (954) 432 -6603 Cris Fardelmann, Chair E -Mail: districtmanager @centralbrowardwod.org Angie Leto, Vice -Chair Douglas R. Bell Judy Ann Bunce David Donzella Mark Flynt July 31, 2014 To Whom It May Concern: Central Broward Water Control District is a local government agency chartered by the State of Florida to provide secondary water management and stormwater drainage in southwest Broward County. Within its 45 square mile area, this drainage district incorporates almost 107 miles of canals that are located within six municipalities in Broward County. The District has worked with RJ Behar since 2007 and has been very satisfied with the quality of their work. ® Under this contract, RJ Behar serves as one of two firms who serve as District Drainage Engineers (DDE). As DDE, RJ Behar reviews plats, applications for water management work permits, paving and drainage plans, as -built plans, and permit renewal applications for conformance with the District's drainage regulations, standards, procedures, and design criteria. RJ Behar also provides other services including drainage criteria, manual updates, special studies, data collection and monitoring, computer modeling, geographic information systems, master planning, design, permitting, cost estimating, construction inspection services, facilities financing, facilities operations and other services as directed by the District. Permit reviews are conducted and verged against District criteria. RJ Behar also participates in the District Board Meetings as representative of the District. For this contract the deliverables consist mostly of comments to submitted permit packages. The responses are reviewed with senior engineers before submittal to the client. On complex reviews, peer review and consultation is also conducted to verify criteria and hydrologic - hydraulic analyses. All of the schedules, budgets, and deliverables are monitored using spreadsheets and scheduling software. Tasks are completed within the time and budgets allocated and staff is professional and pleasant to work with as they accomplish the District's projects. It is my pleasure to provide them with this reference for a job well done. Best, ® Mike Crowley District Manager RFQ No. 14 -07 -02 pg. 5.3 DELIVER rO: City of Sunny Isles Beach City Clerk 18070 Collins Avenue Sunny Isles Beach, FL 33160 REQUESTFOR QUALIFICATIONS SECTION 5 BID SUBMITTAL FORMS �,4 OF SUN "r OPENING: 2:30 PM 08/12/2014 Issued by: Purchasing Agent Date Issued: This Bid Submittal Consists of AndrewRozwadowski' 07/17/2014 Pages 16 through 19 Sealed bids are subject to the Terms and Conditions of this Request for Qualifications and the accompanying Bid Submittal. Such other contract provisions, specifications, drawings or other data as are attached or ® incorporated by reference in the Bid Submittal, will be received at the office of the City Clerk at the address shown above until the above stated time and date, and at that time, publicly opened for furnishing the supplies or services described in the accompanying Bid Submittal Requirement. RFQ 14 -07 -02 Continuing Professional Architectural & Engineering Services Firms Only (CCNA) Procurement Agent., Andrew Rozwadowski Firm Name. R.J. Behar & Company, Inc. CommoditvCode /s): SRV- 925 -00 - Professional Engineering Services RETURN ONE 0) ORIGINAL ONE COPYANO ONE ELECTRONIC POF COPY ON CD OR OVD OF BID SUBMITTAL PAGESANOAFFIDAVITS FAILURE TO SIGN PAGE 16 THROUGH 19 OF THE BID SUBMITTAL WILL RENDER YOUR BID NON -RESPONSIVE 9 City of Sunny Isles Beach I Request for Proposal No. 14 -07 -02 4 01 SUN',_ SECTION 6 BID SUBMITTAL FOR: ACKNOWLEDGEMENT OF ADDENDA INSTRUCTIONS: COMPLETE PART I OR PART II, WHICHEVER APPLIES PART I: LIST BELOW ARE THE DATES OF ISSUE FOR EACH ADDENDUM RECEIVED IN CONNECTION WITH THIS BID Addendum #1, Dated August 1, 2014 ® Addendum #2, Dated Addendum #3, Dated PL•1ANIF Addendum #4, Dated Addendum #5, Dated Addendum #6, Dated Addendum #7, Dated Addendum #6, Dated ❑ NO ADDENDUM WAS RECEIVED IN CONNECTION WITH THIS BID FIRM NAME: R.J. Behar & Company, Inc. AUTHORIZED SIGNATURE: z DATE: August 8. 2014 ® TITLE OF OFFICER: PresidenUCEO City of Sunny Isles Beach I Request for Proposal No. 14 -07 -02 " OF SUN',_ BID SUBMITTAL FORM Bid Title: Continuing Professional Architectural & Engineering Services Firms Only (CCNA) The undersigned Proposers proposes and agrees, if this Bid is accepted, to enter into an agreement with the City of Sunny Isles Beach to perform and furnish all Work as specified or indicated in the Contract Documents and in accordance with the other terms and conditions of the Contract Documents. The Proposers accepts all of the terms and conditions of this or Request for Qualifications. This Bid will remain subject to acceptance for 90 days after the day of Bid opening. The Proposers agrees to sign and submit the Agreement with the other documents required by the Bidding Requirements within ten days after the date of the City's Notice of Award. In submitting this Bid, the Proposer represents, as more fully set forth in the Agreement, that: • The Proposer has familiarized himself /herself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Law and Regulations that in any manner may affect cost, progress, performance, or furnishing of the Work. • The Proposer has given the City written notice of all conflicts, errors, discrepancies that it has discovered in the Contract Documents and the written resolution thereof by City is acceptable to the Proposer. This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation; the Proposer has not directly or indirectly induced or solicited any other Proposers to submit a false or sham Bid; the Proposer has not solicited or induced any person, firm or corporation to refrain from Bidding; and Proposer has not sought by collusion to obtain for itself any advantage over any other Proposers or over the City. The City and the successful Proposer will establish completion times for each individual Work Item and the successful Proposer agrees that the work will be completed within the time frames agreed upon and stipulated in the individual Purchase Orders and /or Notice to Proceed. Firm Name: R.J. Behar & Company, Inc. Street Address: 6861 SW 196"' Avenue, Suite 302, Pembroke Pines, FL 33332 Mailing Address (if different): City of Sunny Isles Beach I Request for Proposal No. 14 -07 -02 �'4 of SUN'S_ E SONNY 1S4 is i9 9 C,/ �* FLOC \O�`'� r), OF SUN P� 0 City of Sunny Isles Beach I Request for Proposal No. 14 -07 -02 "" or suo �" Telephone No. (954) 680 -7771 Fax No. (954) 680 -7781 Email Address: bbehar( dbehar.com FEIN No. -f2/ -L-- 0/-9/-5/4/-DJ-7 /-a * By signing this document the bidder agrees to all Terms Signature: �i—' d. �L (Signature of authorized agent) Print Name: Robert J. Behar, PE 0 Title: President/ CEO THE EXECUTION OF THIS FORM CONSTITUTES THE UNEQUIVOCAL OFFER OF PROPOSER TO BE BOUND BY THE TERMS OF ITS PROPOSAL. FAILURE TO SIGN THIS SOLICITATION WHERE INDICATED ABOVE BY AN AUTHORIZED REPRESENTATIVE SHALL RENDER THE PROPOSAL NON - RESPONSIVE. THE CITY MAY, HOWEVER, IN ITS SOLE DISCRETION, ACCEPT ANY PROPOSAL THAT INCLUDES AN EXECUTED DOCUMENT WHICH UNEQUIVOCALLY BINDS THE PROPOSER TO THE TERMS OF ITS OFFER. City of Sunny Isles Beach I Request for Proposal No. 14 -07 -02 PUBLIC ENTITY CRIMES City of Sunny Isles Beach 18070 Coffins Avenue Sunny Isles Such, FL 33180 Telephone: (308) 947 -0808 Fax: (305) 949-3113 SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a) FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES PUBLIC ENTITY CRIMES Pursuant to the provisions of paragraph (2) (a) of Section 287.133, Florida State Statutes - "A person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a Bid on a Contract to provide any goods or services to a public entity, may not submit a Bid on a Contract with a public entity for the construction or repair of a public building or public Work, may not submit Bids on leases of real property to a public entity, may not be awarded to perform Work as a Contractor, supplier, Sub - Contractor, or Consultant under a Contract with any public entity, and may not transact business with any public entity in excess of the threshold amount Category Two of Sec. 287.017, FS for thirty six months from the date of being placed on the convicted vendor list ". THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS. 11.1. This sworn statement is submitted to City of Sunny Isles Beach by Robert J. Behar PE - PresidenUCEO ua s name a e for R.J. Behar & Company, Inc. ® name -'y eri4 su swom s erne whose business address is: 6861 SW 196th Avenue, Suite 302, Pembroke Pines, FL 33332 and (if applicable) its Federal Employer Identification number (FEIN) is 65- 0954070 (If the entity had no FEIN, include the Social Security Number of the individual signing this swom statement: ) 11.2. 1 understand that a "public entity crime" as defined in Paragraph 287.133(1)(g), Florida Statutes, means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or with the United States, including, but not limited to, any Bid or Contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation. 11.3. 1 understand that "convicted" or "conviction" as defined in Para. 287.133(1)(b), Florida Statutes, means a finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trail court of record relating to charges brought by indictment or information after July 1, 1989, as a result of a jury verdict, non -jury trial, or entry of a plea of guilty or nolo contendere. 11.4. 1 understand that an "affiliate" as defined in Para. 287.133(1)(a), Florida Statutes, means: a.) predecessor or successor of a person convicted of a public entity crime; or ® b.) Any entity under the control of any natural person who is active in the management of the entity and who has been convicted of a public entity crime. The term "affiliate" includes those officers, directors, executors, partners, shareholders, employees, members, and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair oECE KR28,m10 2of7 SVNNT 1j,F EQUAL OPPORTUNITY / AFFIRMATIVE ACTION ® � T. 1O � City of Sunny Isles Beach °, .�,. � � teo7o Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 907-0606 Fax: (305) 94 9-3113 r -� L 2 EQUAL OPPORTUNITY /AFFIRMATIVE ACTION STATEMENT The contractors and all subcontractors hereby agree to a commitment to the principles and practices of equal opportunity in employment and to comply with the letter and spirit of federal, state, and local laws and regulations prohibiting discrimination based on race, color, religion, national region, sex, age, handicap, marital status, and political affiliation or belief. Signed: aw • v2— Title: PresidenUCEO Firm: R.J. Behar & Company, Inc. Address: 6861 SW 196th Avenue. Suite 302 Pembroke Pines, FL 33332 DECEl1 28,2010 4 of 7 DISPUTE DISCLOSURE City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach. FL 33160 Telephone: (305) 947 -0606 Faz (305) 9433113 DISPUTE DISCLOSURE FORM Answer the following questions by placing a "X" after "Yes" or "No ". If you answer "Yes ", please explain in the space provided, or on a separate sheet attached to this form. 19.1. Has your firm or any of its officers, received a reprimand of any nature or been suspended by the Department of Professional Regulations or any other regulatory agency or professional associations within the last five (5) years? YES NO X 19.2. Has your firm, or any member of your firm, been declared in default, terminated or removed from a contract or job related to the services your firm provides in the regular course of business within the last five (5) years? YES NO X 19.3. Has your firm had against it or filed any requests for equitable adjustment, contract claims, Bid protests, ®or litigation in the past five (5) years that is related to the services your firm provides in the regular course of business? n U YES X NO If yes, state the nature of the request for equitable adjustment, contract claim, litigation, or protest, and state a brief description of the case, the outcome or status of the suit and the monetary amounts of extended contract time involved. I hereby certify that all statements made are true and agree and understand that any misstatement or misrepresentation of falsification of facts shall be cause for forfeiture of rights for further consideration of this Bid for the City of Sunny Isles Beach. R.J. Behar & Company, Inc. Firm Authorized Signature August 8, 2014 Date Robert J. Behar, PE - PresidenUCEO Print or Type Name and Titre DECEwaER 28, MIO 6 of 7 �4�F SVHM. •. OW o. m• DISPUTE DISCLOSURE City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach. FL 33160 Telephone: (305) 947 -0606 Faz (305) 9433113 DISPUTE DISCLOSURE FORM Answer the following questions by placing a "X" after "Yes" or "No ". If you answer "Yes ", please explain in the space provided, or on a separate sheet attached to this form. 19.1. Has your firm or any of its officers, received a reprimand of any nature or been suspended by the Department of Professional Regulations or any other regulatory agency or professional associations within the last five (5) years? YES NO X 19.2. Has your firm, or any member of your firm, been declared in default, terminated or removed from a contract or job related to the services your firm provides in the regular course of business within the last five (5) years? YES NO X 19.3. Has your firm had against it or filed any requests for equitable adjustment, contract claims, Bid protests, ®or litigation in the past five (5) years that is related to the services your firm provides in the regular course of business? n U YES X NO If yes, state the nature of the request for equitable adjustment, contract claim, litigation, or protest, and state a brief description of the case, the outcome or status of the suit and the monetary amounts of extended contract time involved. I hereby certify that all statements made are true and agree and understand that any misstatement or misrepresentation of falsification of facts shall be cause for forfeiture of rights for further consideration of this Bid for the City of Sunny Isles Beach. R.J. Behar & Company, Inc. Firm Authorized Signature August 8, 2014 Date Robert J. Behar, PE - PresidenUCEO Print or Type Name and Titre DECEwaER 28, MIO 6 of 7 E E C y °NMV trxF a - NON- COLLUSION AFFIDAVIT City of Sunny Isles Beach 16070 Collins Avenue `. xI. • rat °-`OO: Sunny Isles Beach. FL 33160 Telephone: (305) 647 -0606 Fax: (305) 94 &3113 STATE OF FLORIDA COUNTY OF Broward ) The undersigned being first duly swum as provided by law, deposes, and says: This Affidavit is made with the knowledge and intent that it is to be filed with the City of Sunny Isles Beach City Commission and that it will be relied upon by said County, in any consideration which may give to and any action it may take with respect to this Bid. The undersigned is authorized to make this Affidavit on behalf of, R.J. Behar & Company, Inc. (Name of Corporation, Partnership, Individual, etc.) a, Corporation , formed under the laws of Florida (type of Business) (State) of which he is President/CE0 (Sole Owner, Partner, President, etc.) Neither the undersigned nor any person, firm, or corporation named in above Paragraph 10.2, nor anyone else to the knowledge of the undersigned, have themselves solicited or employed anyone else to solidi favorable action for this Bid by the City, also that no head of any department or employee therein, or any officer of the City of Sunny Isles Beach, Florida is direly interested therein. This Bid is genuine and not collusive or a sham; the person, firm or corporation named above in Paragraph 10.2 has not colluded, conspired, connived or agreed directly or indirectly with any proposers or person, fine or corporation, to put in a sham Bid, or that such person, fine or corporation, shall refrain from Bidding, and has not in any manner, directly or indirectly, sought by agreement or collusion, or communication or conference with any person, firm or corporation, to fox the prices of said Bid or Bids of any other proposers; and all statements contained in the Bid or Bids described above true; and further; neither the undersigned, nor the person, firm or corporation named above in Paragraph 102, has directly or indirectly submitted said Bid or the contents thereof, or divulged information or data relative thereto, to any association or to any member or agent thereof. Robert J. Behar, PE AFFIANT'S NAME PresidentICE0 AFFIANT'S TITLE TAKEN, SWORN AND SUBSCRIBED TO BEFORE ME this 80 day of August —2014 Personally Known ✓, or Produced Identification Type of identification (Affix seal here) ,," LIZANNA KAOIR +% 4n MY COMMISSION #EE880400 EXPIRES: MAY 13, 2017 Bonded through 1st Slate Insurance DEteyaen 28.2010 NOTARY PUBLIC (name printed or typed) 1 of 7 E 11 market value under an arm's length agreement, shall be a prime facie case that one person controls another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall be considered an affiliate. 11.5. 1 understand that a "person" as defined in Para. 287.133(1)(e), Florida Statutes, means any natural person or entity organized under the laws of any state or of the United States with the legal power to enter into a binding Contract and which Bids or applies to Bid on Contracts for the provision of goods or services let by a public entity, or which otherwise transacts or applies to transact business with a public entity. The term "persons" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in management of any entity. 11.6. Based on information and belief, the statement which I have marked below is true in relation to the entity submitting this sworn statement. (Indicate which statement applies.) X Neither the entity submitting this sworn statement, nor any of it's officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, nor any affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. However, there has been a subsequent proceeding before a Hearing Officer of the State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer of the State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer determined that it was not in the public interest to place the entity submitting this sworn statement on the convicted vendor list. (Attach a copy of the final order.) I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 11.1 (ONE) ABOVE IS FOR THAT PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED. I ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES, FOR CATEGORY TWO OF ANY, CHANGE IN THE INFORMATION CONTAINED IN THIS FORM. By. -� arr Q— (Signature) Robert J. Behar (Printed Name) President/CE0 (Title) Sworn to and subscribed before me this 8k` (AFFIX NOTARY STAMP LIMINA KADIR MY COI.IMISSION 9EE88M EXPIRES: MAY 13, 2017 Bonded through 1st State InsurMC Personally Known Type of Identification Produced 10/1x0 day of August , 20 14 , by Signature: Notary Publig — State of Florida L-1 ZA n n q 1G0,A 1 /' Print or Type Commissioned Name OR Produced Identification 3 of SUNNY /JrF < r1 ft . CONFLICT OF INTEREST City of Sunny Isles Beach 18070 C 0m Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947 -0606 Fax: (305) 949 -3113 CONFLICT OF INTEREST STATEMENT The award of any contract hereunder is subject to the provisions of Chapter 112, Florida State Statutes. Proposers must disclose with their Bids, the name of any officer, director, partner, associate or agent who is also an officer or employee of the City of Sunny Isles Beach or its agencies. STATE OF FLORIDA COUNTY OF Broward BEFORE ME, the undersigned authority, personally appeared Robert J. Behar deposes, and states: who was duly swom, 18.1. 1 am the Owner of R.J. Behar " Company, Inc. with a local office in Miami Lakes and principal office in em roe lnes 18.2. The above named entity is submitting a Bid for the City of Sunny Isles Beach, Bid NoRFQ No.14 -07- Qescbed as: Landscape Maintenance Services. The Affiant has made diligent inquiry and provides the information contained in this Affidavit based upon his own knowledge. 18.3 The Affiant states that only one submittal for the above Bid is being submitted and that the above named entity has no financial interest in other entities submitting Bids for the same project. 18.4 Neither the Affiant nor the above named entity has directly or indirectly entered into any agreement, participated in ®any collusion, or otherwise taken any action in restraints of free competitive pricing in connection with the entity's submittal for the above Bid. This statement restricts the discussion of pricing data until the completion of negotiations if necessary and execution of the Contract for this project. 18.5 Neither the entity nor its affiliates, nor any one associated with them, is presently suspended or otherwise ineligible from participation in contract letting by any local, State, or Federal Agency. 18.6 Neither the entity, nor its affiliates, nor any one associated with them have any potential conflict of interest due to any other clients, contracts, or property interests for this project. 18.71 certify that no member of the entity's ownership or management is presently applying for any employee position or actively seeking an elected position with the City of Sunny Isles Beach. 18.81 certify that no member of the entity's ownership or management, or staff has a vested interest in any aspect of the City of Sunny Isles Beach. 18.9 In the event that a conflict of interest is identified in the provision of services, I, on behalf of the above named entity, will immediately notify the City of Sunny Isles Beach. Dated this 80 day of Au ust , 2014 Robert J. Behar. PE PresidenYCEO AFFIANT 1'PPrrint or Type Name and Title Sworn to and subscribed before me this a day of "'+- 20 UN L01 Personally Known _ O Produced Identification NOTARY PUBLIC STATE OF FLORIDA ® UZMNA NADIR MY MIRES: MAY 13, 201400 DlPIRES: MAY 13, 2017 BornM Mmupt 1st State Insurance DEOE9eER 28, 2010 OR Type of Identification 5 of C E STATE OF FLORIDA COUNTY OF Broward ANTI - KICKBACK City of Sunny Isles Beach 18070 Coflim Avenue Sunny Isles Beach. FL 33180 Telephone: (305) 947-0808 Fax: (305) 9493113 ANTI- KICKBACK AFFIDAVIT I, the undersigned, hereby duly sworn and deposed say that no portion of this sum herein Bid will be paid to any employees of the City of Sunny Isles Beach or its elected officials as a commission, kickback, reward or gift, directly or indirectly by me or any member of my firm or by an officer of the corporation. By: !3!z6L Title: PresidenUCEO The foregoing instrument was acknowledged before me this 8th day of August ' 2014 • by Robert J. Behar. PE [name of person], as PreSidenVCEO [type of authority], for R.J. Behar & Company, Inc. [name of party on behalf of whom instrument was executed]. AFFIX NOTARY STAMP HERE: �.r LRANNA WIR MYCOMMISSION #EE880400 EXPIRES: MAY 13. 2017 ' o•r� Bonded through 151 State Insurance Personally Known 4 ,-' OR Type of Identification Produced _ Notary Public — State of Florida L I Z.R, vt n q. k— ,wA \ ✓• Print or Type Commissioned Name Produced Identification 7of7 yVNMi �t�F w � Oi rY• C E STATE OF FLORIDA COUNTY OF Broward ANTI - KICKBACK City of Sunny Isles Beach 18070 Coflim Avenue Sunny Isles Beach. FL 33180 Telephone: (305) 947-0808 Fax: (305) 9493113 ANTI- KICKBACK AFFIDAVIT I, the undersigned, hereby duly sworn and deposed say that no portion of this sum herein Bid will be paid to any employees of the City of Sunny Isles Beach or its elected officials as a commission, kickback, reward or gift, directly or indirectly by me or any member of my firm or by an officer of the corporation. By: !3!z6L Title: PresidenUCEO The foregoing instrument was acknowledged before me this 8th day of August ' 2014 • by Robert J. Behar. PE [name of person], as PreSidenVCEO [type of authority], for R.J. Behar & Company, Inc. [name of party on behalf of whom instrument was executed]. AFFIX NOTARY STAMP HERE: �.r LRANNA WIR MYCOMMISSION #EE880400 EXPIRES: MAY 13. 2017 ' o•r� Bonded through 151 State Insurance Personally Known 4 ,-' OR Type of Identification Produced _ Notary Public — State of Florida L I Z.R, vt n q. k— ,wA \ ✓• Print or Type Commissioned Name Produced Identification 7of7