HomeMy WebLinkAboutReso 2023-3528RESOLUTION NO. 2023-J
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH,
FLORIDA, APPROVING A PAYMENT TO BREEZELINE FOR THE GOLDEN SHORES
UTILITY UNDERGROUNDING PROJECT, IN AN AMOUNT NOT TO EXCEED TWO
HUNDRED SIXTY-FOUR THOUSAND THREE HUNDRED NINETY-THREE DOLLARS
AND THIRTY-FOUR CENTS ($264,393.34), ATTACHED HERETO AS EXHIBIT "A";
AUTHORIZING THE CITY MANAGER TO DO ALL THINGS NECESSARY TO
EFFECTUATE THIS RESOLUTION; PROVIDING FOR AN EFFECTIVE DATE.
WHEREAS, the City is currently proceeding with the Golden Shores Utility
Undergrounding Project ("Project"); and
WHEREAS, pursuant to Breezeline's, f/k/a Atlantic Broadband, Electric Tariff and Florida
Administrative Code Section 25-6.115, Breezeline has agreed and submitted a Binding Cost
Estimate for the installation of main line wiring, transmission equipment, and final connections
to the individual properties; and
WHEREAS, the City now wishes to approve the payment to Breezeline in an amount not
to exceed Two Hundred Sixty -Four Thousand Three Hundred Ninety -Three Dollars and Thirty -
Four Cents ($264,393.34), attached hereto as Exhibit "A".
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF SUNNY
ISLES BEACH, FLORIDA, AS FOLLOWS:
Section 1. Approval of Payment. The City Commission hereby approves the payment to
Breezeline, in an amount not to exceed Two Hundred Sixty -Four Thousand Three Hundred
Ninety -Three Dollars and Thirty -Four Cents ($264,393.34), attached hereto as Exhibit "A", for
the Golden Shores Utility Undergrounding Project.
Section 2. Authorization of City Manager. The City Manager is hereby authorized to do all
things necessary to effectuate this Resolution.
Section 3. Effective Date. This Resolution will become effective upon adoption.
PASSED AND ADOPTED this 17th day ofAugugt 2023.
risa Svechin, Mayor
@BCL@64073139.doc Page 1 of 2
ATTEST: n
MauVicio �etanc�r, CMC, City Clerk
APPROVED AS TO FORM
AND LEGAL SUFFICIENCY:
A. "444a)
in E. Boileau, for Nabors, Giblin
& Nickerson, P.A., City Attorney
Moved by� µ. /U/v� econded by:—
Vote:
Mayor Svechin
Vice Mayor Joseph
Commissioner Lama
Commissioner Stuyvesant
Commissioner Viscarra
@BCL@64073139.doc Page 2 of 2 55
(Yes)
(No)
(Yes)
Yes)
(No)
(No)
(Yes)
(No)
(Yes)
(No)
@BCL@64073139.doc Page 2 of 2 55
Invoice
breezeline DATE: 8/7/2022
2022 -PF -032
REMIT PAYMENT TO: DUE ON RECEIPT
Breezeline
c/o Angela Ables - Miami Finance Dept
1552 Oapens Rd
Warrenville SC 29851
Bill To:
ATTN: Paul Abbott
COMPANY NAME: City of Sunny Isles Beach Capitol Improvements
BILLING ADDRESS: 18070 Collins Ave, Sunny isles Beach, FL 33160
PROJECT ADDRESS: Golden Shores Overhead Relocation Project- 195th ST - 191 st Terr from Atlantic Blvd - N Bay Rd
EMAIL: sibil.net
PHONE: (305) 947-0606
BREEZELIKE PROJECT NAME & LOCATION: BPW CFR Relocation PO# Pending
of Golden Shores HOA Relocation -I 85th ST - 191 st Terr from Atlantic Blvd -
N Bav Rd
BREEZELINE PROJECT MANAGER: Pete Freytag/ Maggie Garcia
DESCRIPTION AMOUNT
Labor, Engnerring & Material $ 264,393.34
Labor cost: $140,006.00
Materials cost: $124,387.34
Golden Shores HOA Relocation - 185th ST - 191st Terr from Atlantic Blvd - N Bay
Rd
Total $ 264,393.34
MAKE ALL CHECKS PAYABLE TO BREEZELIKE. PAYMENT BY CHECK
ONLY. REMIT PAYMENT TO ADDRESS ABOVE ATTN: FINANCE DEPT.
�4
D �I�V
10785 Marks Way
r
Miramar, FL 33025
breezeline- Tel (3051-661-6069
Fax (305)-861.6047
From:
Unit Numbers:
Breezeline Rate sheet.
Project Name:
Qt
Address:
Golden Shores HOA Relo 186.191 St
City:
Sunny Isles
Total Units:
Total Labor:
$140,006
Total Materiels:
$0
Total Cost:
$140,006
Attn:
Unitoc
Date: 10/21/2021
Protect Type
New Build:
Forced Relocation:
Customer Funded Relo:
Fire Code Violation:
MDU RewiretUp9rade:
Plant Maint. I Upgrade:
Emergency call out
Item
Qt
UM
rtev - I--
I
Unit Price I
Unit Price
Aerial Construction
1
Ft
Composite Aerial ( Install strand and hardware (including: down guys, vertical rounds, anchors, continuity$1.65
$0.00
Ft
Place Strand OnlyPlace strand and all related support harware and continui bonds. To include all anchors.
$0.45
$0.00
Ea
Strai th Splice for strand if strand is broken and there is no need of new strand
$35.00
$0.00
Ft
Lash Coaxial Cable to Strand Over lash coax to existin cable baring strand. Double lash). Includes u to 3
$0.58
$0.00
Ft
Lash / OverlaC Additional Coaxial Cable u to 2 cables
$0.60
$0.00
Ft
Delash/ Relash Coaxial or Fiber Optic Cable Delash coax/fiber from existingstrand package and relash to new
$0.65
$0.00
Ea.
Band Steel or Concrete Pole Install a minimum 2-1" stainless steel bands and block to a concrete/steel ole
$28.00
$0.00
Ft
Wreck out Existin Overhead PIanUAerial lent Strand footage)
$0.25
$6.960.00
Ea.
Install Down Gu & guard to ExistingAnchor (Install down u , continui bond and u uard to existinganchor).
$12.00
$0.00
U27840
Ea.
Install Screw Anchor with Down Gu & Gu Guard Installation of screw anchor and down u with u uard and
$50.00
$0.00
Ea.
Install Bust Anchor with Down Gu & Gu Guard Installation of bust anchor and down u with u uard and
$50.00
$0.00
Ea.
Install Vertical round with #6 Ground Wire &GroundRod installation of 5/8" x 8 ' round rod and vertical 1I$
$30.00
$0.00
Ea.
Install Riser Guard Install riser uard 2" or 4" with riser boot . U to 2 ieces$30.00
$0.00
Ea
Install Extension Arm Install extension arm u to 4 Ft
$18.00
$0.00
$0.00
Ea.
Transfer existin down u to new Pole transfer.
$12.00
Ea.PoleTransfer
sim le
$50.00$0.00
$65.00
Ea.
Pole Transfer Com lex
$500.00
$0.00
$0.00
Ea.
Emer enc call out after 5:00 PM M -F or weekends
$0.00
19
Ea.
Delash onl Coaxial or Fiber O tic Cable
$0.50
$0.30
0.00
20
21
Ea.
Ft
Resa existin plant
Change Pole Attachment height Chan!3e attachment height existingole
$45.00
$0.00
5
22
Down Gu &Anchor Remove existin down u and anchor
$50.00
$35.00
$1,000.00
50.00
23w
In -Line Pole Attachment (Attachingto a new in-line ole
$7.50
$0,00
24ro
move make read
Set -u Attachment Set -u fee's Less than 500 Feet')r uires re a proval b AB8 Su ervisor
$130.00
$0.00
25rial
26ee
Trimmin Re uires re -a roval b ABB Su rvisor, to be aid when tree trimmin is excessive before$0
$0.027L
*20move
Permit/ foot & Route Develo ment $250 Minimum
70
$160.00
$0.028PLMake
Read Poles
$25.00
$002gPL
Non Make Read Poles
50.30
50.00
30erial
Draftin CAD and PDF for FDOT/ Coun Permit
$015
$0.00
31erial
As -Built CAD and PDF
Jurisdiction Includes Fillin out a iication rennin ermit notification
$535.00
$0.00
32
Ea.
Perm ProcessingFee per Permitl er
Ea.
A Snow shoe installation
$0.00
Ft
Under round Construction
Com osite Under round Placement u to 36" de thin of i to include Placement of u to 3 direct bu
$3:0000
$0000000
$0.00
33
3q
100
Ft
MachineTrenchin Ortl u to 36" depth, to of i e, includes warnin tape)
$5.00
35
Ft
Hand di in trench u to 36" de th to of pipe, includes wamin tae
$1.95
$0.00
36
Ft
Rock / Coral trenchin Adder Re uires -approval b ABB Su ervisor
10'
512 00
$0.00
37
Ft
Missile Bore u 10 21, min 24 " Includes lacement of PVC and as-builts bore de th eve
Addition bore at same location, same requirements as U to 2"
$7.00
$0.00
38
Ft
Additional 2" Missile Bore at Same Location
HPDE conduits and as -built, must includes bore I s 300
$14.00
39
Ft
Directional Bore 4" Includes lacement of PVC or
Directional Bore 4" Include PVC less than 350 Feet must include boar logs
$0.00
4D
Ft
Ft
Additional 4" Directional Bore at Same Location Additional bore at same location, same r uirements as 4"
812.00
$000
41
42
Ft
Directional Bore 2" Include PVCover 300 Feet
$14.00
$0.00
q3
Ft
Directional Bore 2" Include PVC under 300 Feet
$12.00
$1,800.00
qq
150
Ea
Ea.
Install Boots and Seal Pipe
Solt Di for ex osin existin facilities on Directional Bores Burin permit process)
$80.00
$0.50
$2.000.00
$0.00
A 5
46
25
Install ull Strin and mule to a in Conduit.
Pull Coaxial Cable Throe h Em t Conduit I U. cable throe h new or existin em t conduits. includes ell
$1. 0
$55.628.00
47
23820
Ft
Ft
Pull Coaxial Cable Throu h Conduit with Cables Present
$8,50
$0,00
48
49
4020
S Ft As halt Removal and Restoration lus the cost of As hault
$15.00
$0.00
50
S Ft Concrete Removal and Restoration les the Cost of Concrete
Pedestal to is litter/cou ler includes equip ment to destal brackets and attachin all bounds to
$21.00
0.00
$ 600.00
51
120
Ea.
Install Small
Install Medium Pedestal Line Extender, Includes attachin equipment to pedestal brackets and attachingall
$30.00
$$80
$60
52
20
Ea.
Ea.
Install Lar a Pedestal (Amplifier, includes attachinga ui ment to destal brackets and attachin all bounds to
00
$0,00
53
54
Ea.
Install Small Vault (12" X 18"
$155.00
$1.550.00
55
10
Ea.
Install Medium Vault (18" X 30"
$350.00
$0.00
56
Ea.
Install Lar a Vault 24" X 36" or 36" X 48°
$500.00
$0.00
57
Ea
Install Lar er Vault 48" X 48"
65.00
$0.00
58
Ea
Pum Men Hole Setu Re uires ABB Pre A roust
$225.00
$1,575.00
59
7
Ea.
Install Node Pedestal Rhino
H
City of Sunny Isles Beach
18070 Collins Avenue
Sunny Isles Beach, Florida 33160
(305) 947-0606 City Hall
(305) 949-3113 Fax
MEMORANDUM
TO: Honorable Mayor and City Commissioners
VIA: Stan Morris, City Manager
FROM: Paul Abbott, City Consultant
DATE: August 17, 2023
RE: Approval of Payment to Breezeline for Golden Shores Utility UndergroundinE
Project
RECOMMENDATION:
Staff recommends approval of this Resolution.
REASONS:
The utility conversion project from overhead to underground has progressed to the point where the
City portion of the project, the conduit, foundations, handholes, etc. installation, is complete. We are
now seeking authorization to pay Breezeline for the final installation of residential service connections
to the homes within the Golden Shores Neighborhood. The responsible utility will now install main line
wiring, transmission equipment (cabinets, pedestals, etc.) and the final connections to the individual
homes.
ADDITIONAL INFORMATION:
The cost of this activity is included in the overall budget appropriation for the conversion project.
Beezeline Invoice 2022 -PF -032 - $264,393.34
FUNDING SOURCE:
Funds have been appropriated in account no. 300/450-5-5410-465000-20003.
ATTACHMENTS:
Resolution
Invoice
Item Number: 10.13