Loading...
HomeMy WebLinkAboutCalvin Giordano & Assoc. Inc.71--'--, JU; I • • • • Calvin, Giordano & Associates, Inc. i � S F'- i -EP T I O N A L S O L O T I O N S LUVti LeLAef Section1 Company Information ............................................................................................................................. ..............................1 • Name ofAgency/ Company ........................................................................................................... ..............................1 • Company Locations .......................................................................................................................... ..............................1 • Internet Web Site Address ............................................................................................................ ..............................2 • Business Structure ............................................................................................................................ ..............................2 • Date Founded ...................................................................................................................................... ..............................2 • Home Office Address and Telephone Number ..................................................................... ..............................2 • Litigation Statement ........................................................................................................................ ..............................2 • Proofoflnsurance ............................................................................................................................ ..............................3 • Implement Service After Authorized to Begin ..................................................................... ..............................4 Section2 Qualifications .............................................................................................................................................. ..............................5 • Licenses ............................................................................................................................................... .............................11 • Certificate of Status ........................................................................................................................ .............................13 • Occupational Licenses .................................................................................................................. .............................14 • Relevant Experience ...................................................................................................................... .............................14 Section3 Staffing ....................................................................................................................................................... ............................... 30 • Project Manager Experience ...................................................................................................... .............................30 • Contract Manager ........................................................................................................................... .............................32 • Organizational Chart ..................................................................................................................... .............................33 • Resumes .............................................................................................................................................. .............................33 Section4 Approach / Methodology ..................................................................................................................... ............................... 55 • Ability to Meet Desired Time -lines and Deadlines ......................................................... ............................... 60 Section5 References ................................................................................................................................................ ............................... 61 Section6 Contract Forms ....................................................................................................................................... ............................... 65 • Section 5 - Bid Submittal Form ............................................................................................... ............................... 66 • Acknowledgment of Addenda ................................................................................................. ............................... 67 • Bid Submittal Form ...................................................................................................................... ............................... 68 • Non-Collusion Affidavit .............................................................................................................. ............................... 70 • Public Entity Crimes .................................................................................................................... ............................... 71 • Equal Opportunity /Affirmative Action Statement ........................................................... .............................73 • Conflict of Interest Statement .................................................................................................. ............................... 74 • Dispute Disclosure Form ............................................................................................................. .............................75 • Anti- Kickback Affidavit ............................................................................................................... ............................... 76 RFQ No. 14 -07 -02 1 Continuing Professional Services fJ e U o ZVI 'r� e 5J v e �J oy ° 0V Z J ° ° 0 °a e e er e e e e e • • • e e e e Auilding Code Services 0oastal Engineering ode Enforcement onstruction Engineering S wspection Construction Services e;ontract Government Wata Technologies & evelopment emergency Management services engineering �py'overnmental Services 'Indoor Air Quality eandscape Architecture & Environmental Services Slunicipal Engineering elanning �ublic Administration <edevelopment & Urban �esigo Renewable Energy eesort Development urveying & Mapping ® Transportation Planning d Of raffic Engineering Utility & Community Waintenance Services 0Vater Resources ,xlanagement e *'' 800 Eller Drive, Suite 600 on Lauderdale, FL 33316 ohone: 954.921.7781 ax: 954.921.8807 e ew%vw. c ga so l u t i o n s. c o rn e 0 Calvin, Giordano & Associates, Inc. S C E P T 1 0\ A L August 12, 2014 S O L U T I O N ' S City of Sunny Isles Beach 18070 Collins Avenue, 4th Floor Sunny Isles Beach, Florida 33160 RE: Continuing Professional Services for Architectural, Landscape Architectural, Engineering and Land Surveying Firms Only; RFQ No. 14- 07 -02, Dear Selection Committee: Calvin, Giordano & Associates, Inc. (CGA) is pleased to submit our Statement of Qualifications for landscape architectural, engineering and land surveying Services to the City of Sunny Isles Beach. We have carefully reviewed the scope of services to be provided for this project, and have selected a project team based on past performance to ensure that the City of Sunny Isles Beach is provided with the necessary skills to successfully complete all services outlined in this RFQ. CGA's goal is to meet and exceed the City's requirements for these contract services. We are a well - established, multi- disciplinary firm with offices located in Fort Lauderdale, West Palm Beach, Port St. Lucie, Homestead, Clearwater, Jacksonville and Atlanta, Georgia. For 77 years, our firm has been providing municipal consulting services - mostly to the South Florida area. Our experience, gained through long- standing relationships with local governments and our diverse personnel, makes us uniquely qualified to deliver the required quality services stipulated in the RFQ's Scope of Services. If selected, CGA's Fort Lauderdale office located at 1800 Eller Drive, Suite 600, Fort Lauderdale, FL will be the responsible office for this contract. Dennis Giordano, will serve as the Principal -in- Charge of the proposed project, and Robert McSweeney, PE, will serve as the Project Manager, and Chris Giordano, MSC serving as Contract Manager. They can be reached at (954) 921 -7781: dgiordanoPcgasolutions.com, bmcsweeneyocgasolutions.com, or cgiordano@cgasolutions.com. EXPERIENCE THAT COUNTS Mr. McSweeney has more than 25 years of local experience in South Florida including permitting, design, project management and construction administration. His main focus over the past 14 years has been in service of municipal /governmental clients. He understands the necessary efforts of construction activities in infrastructure improvement projects as well as dealing with the public and acting as a liaison to the City, the process of overseeing the performance of the contractor as well as the resident project representative duties and administration, and ensuring final completion of the project for a successful close -out. Fort Lauderdale West Palm Beach Port St. Lucie Homestead Clearwater Jacksonville Atlanta RFQ No. 14 -07 -02 Continuing Professional Services August 12, 2014 Page 2 WHY CGA • In -depth knowledge of the new and existing governmental rules and regulations • Extensive experience with various municipalities in South Florida, including the City of Sunny Isles Beach • Long track record with grants and knowledge of alternative revenue sources to assist the City from concept to completion of selected projects • Experienced Project Manager, each with an extensive amount of experience • Established firm located in South Florida serving the local area for 77 years Thank you for giving us the opportunity to respond to this solicitation. 1 know that given the opportunity, the City of Sunny Isles Beach will benefit from our extensive experience in the industry. Sincerely, CALVIN, GIORDANO & ASSOCIATES, INC. L9nis . for ano President r.I LJ g v- !.:' Calvin, Giordano 8 Associates, Inc. �C'/) V E% C E P T 1 O N A L i O L U T 1 0 �N 5 ® V NAME OF AGENCY /COMPANY Calvin, Giordano & Associates, Inc. (CGA) is a multi - disciplinary firm that began as a small two per- son- surveying firm in Florida over 77 years ago. From 1937 to 2014 we have grown to over 300 employees, expanded geographically with offices in Fort Lauder- dale, West Palm Beach, Port St. Lucie, Homestead, Clearwater, Jacksonville and Atlanta, Georgia. Calvin, Giordano & Associates has strategically added an exceptionally broad range of services to meet our clients' needs. Our professional services include: • Building Code Services • Coastal Engineering • Code Enforcement • Construction Engineering & Inspection • Construction Services • Data Technologies & Development • Emergency Management Services • Engineering • Environmental Services • Governmental Services • Indoor Air Quality • Landscape Architecture • Municipal Engineering • Planning • Public Administration • Redevelopment & Urban Design • Renewable Energy • Resort Development • Surveying and Mapping • Transportation Planning and Traffic Engineering • Utility & Community Maintenance Services • Water Resources Management COMPANY LOCATIONS Calvin, Giordano & Associates Fort Lauderdale office located at 1800 Eller Drive, Suite 600, Fort Lauder- dale will be the responsible office. OTHER OFFICE LOCATIONS Homestead Office 97 NE 15th Street Homestead, Florida 34590 Tel: (786) 243 -0071 Treasure Coast (WPB Office) 560 Village Boulevard, Suite 340 West Palm Beach, Florida 33409 Tel: (561) 684 -6161 Port St. Lucie Office 2400 SE Veterans Memorial Parkway, Suite 207 Port St Lucie, Florida 34952 Tel: (772) 489 -9494 Tampa Office 13535 Feather Sound Drive, Suite 135 Clearwater Florida 33762 Tel: (727) 394 -3825 Jacksonville Office 111 Riverside Avenue Jacksonville, Florida 32202 Tel: (904) 834 -4314 Metro Atlanta Office Ashford Perimeter 4151 Ashford Dunwoody Rd NE, Suite 120 Atlanta, Georgia 30319 Tel: (678) 252 -1096 OFFICE LOCATION FOR ANTICIPATED SUB-CONSULTANT Langan Engineering & Environmental Services, Inc. Parkside Corporate Center 15150 NW 79th Court, Suite 200 Miami Lakes, Florida 33016 -5848 Tel: (786) 264 -7200 t(ij� RFQ No. 14 -07 -02 1 Continuing Professional Services 1 Calvin. Giordano is Associates, Inc. E x C E P T 1 0 N A t > 0 t u T 1 0 N i INTERNET WEB SITE ADDRESS Calvin, Giordano & Associates website address is: www.cgasolutions.com. BUSINESS STRUCTURE Business Legal Status Corporation State /Date Incorporated Florida / June 27, 1985 DATE FOUNDED Authorized in Florida 1937 as M.E. Berry & Associates, Inc. HOME OFFICE ADDRESS AND TELEPHONE NUMBER Home Office Address: 1800 Eller Drive, Suite 600 Fort Lauderdale, FL 33316 Telephone Number: (9S4) 921 -7781 Local Address /Number: Same as above LITIGATION STATEMENT In the last five (5) years CGA has been involved in the following litigation: 1. Vue Condominium Association, Inc. vs. Vue Fort Lauderdale, L.L.C., ET AL, Case No. CACE09012422 .Suit was filed March 3, 2009. This is a typical con- dominium construction defect suit involving the de- veloper, contractor, numerous subcontractors and all the design team. The condominium association voluntarily dismissed its claim against Calvin, Gior- dano February 2011. 2. Walnut Creek Community Development District vs. Standard Pacific of South Florida, GP, Inc., Et AI, Case No. CACE10019353. Suit was filed May 4, 2010. The case concerns the failure of an HDPE drainage sys- tem and is in the early stages of discovery. The oth- er parties include the developer, the pipe manufac- turer and the contractor which is defunct but which may have insurance coverage. Our understanding is that the problems are primarily the result of defec- tive manufacture of the HDPE pipe although design and construction deficiencies also are alleged. This case has been settled. filed in an attempt to collect payment from B.P. Ex- ploration and Production for services performed by Calvin, Giordano & Associates on behalf of Franklin County, Florida. This case has been settled. 4. Villas at Harbor Isles Condo filed suit NO. CACE 09- 043012(18) against Harbor Isles by Quantum, Inc., et. al. (Calvin, Giordano & Associates, Inc.); filed in Broward County Circuit Court. Complaint original- ly filed 8/2009 (no claims against Calvin Giorda- no & Associates). Third Amended Complaint filed 5/2012 including claims against Calvin Giordano & Associates. Condominium construction defects case with claims against Calvin Giordano involving alleged improper sloping at lake banks and improp- erly specific catch basin grate covers. This case has been settled. 5. Merrick Preserve Condominium Association, Inc. v. Westbrooke Homes, Florida general partnership NO. CACE 08 11218(07); Third Party Complaint filed August 2011. Breach of Contract alleging fail- ure to include developer as an additional insured on commercial general liability policy; Contractual Indemnification and Common Law Indemnification claims involving alleged deficiencies in grading of back yards and paving of driveways resulting in ponding. Condominium defects suit in which devel- oper filed third party claims against subcontractors and design professionals. The case has been settled. 6. Armando E. Silva, and Robin Silva, both individually and as natural parents and next friends of Spencer Silva and Heather Silva, minors, v. South Broward Hospital district, d /b /a Memorial Regional Hospi- tal, Hai-drives of Delray, Inc., d /b /a Hardrives, Inc., a Florida Profit Corporation, Calvin, Giordano & As- sociates, Inc., a Florida Profit Corporation, and ANF Group, Inc., a Florida Profit Corporation, filed suit on October 2S, 2013 in the Broward County Circuit Court. NO. CACE13023917. Traffic accident. This case is in discovery. 7. Edward B Wallace Plaintiff vs. Calvin, Giordano & Associates Inc Defendant. Whistle Blower. Suit filed on July 23, 2012 in the Broward County Circuit 3. Calvin, Giordano & Associates and Franklin County, Court. NO. CACE12020634.This case is in discovery. Florida filed lawsuit NO.4:2012cv00001 in the Flor- ida Northern District Court against B.P. Exploration 8. Kevin Young v. Calvin, Giordano & Associates, Inc. and Production Inc. in January 2012. The suit was ADA. This case is in discovery. [}� RFQ No. 14 -07 -02 1 Continuing Professional Services 2 Calvin, Giordano 8 Associates, Inc. E X C E P 1 1 0 N A L i O L U T 1 0 R S PROOF OF INSURANCE CALVI -2 OP ID: E1 CERTIFICATE OF LIABILITY INSURANCE 1 12/330113 0113 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(SA AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy. certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endomemen s . rmooucen 954- 776 -2222 Brown & Brown of Florida, Inc. 1201 W Cypress 966- 776d46fi Creek Rd 0 130 P.O. Box 5727 cc"'xcT PIN)NE FAx E�IAn xppeE5`I FL Lauderdale, FL 33310 -5727 wwRE s AFroamp cpvEnAr.E NNC F Stephen E. Patton, AAI wwxIR A: Hartford Casualty ins. Co _ _ _129424_ ww. a: Hartford Ins Co of Midwest _ 137478 _ IIIIYRED Calvin, Giordano 8, Associates, Inc. Attn: Dennis Giordano 1800 Eller Drive 0600 ww.c: American Guar & Liab Ins Co 126247 INwT¢a o: Hartford Ins. Co. of the S.E. _ 38261 FL Lauderdale, FL 33316 wwR E: Contlnental Casualty Company 20443 caw.. F: fnVFRAr FC r.FRTIFlr.ATF NI IMRFR- RFVICIr1N NIIMRFR THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT. TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WMICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN. THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. LTp ttPE OF INwRANCE FONCY NUYaER IWRs Lm IxpalwBR 1 �LICY EFFT MIDM,YYY A GENERAL LYBLTY ix1 COM.ERCM GENERAL LMBaIiY �ctAMS UApE xloccDR 21UUNLK3645 01101116 01/01115 EACH OCCURRENCE I _ 1,000. Dw"rf TO RENTED -- _ Is 300, pPSU1sES E _ MED EV IWN�wrO^1 i3 10, PERSONA/ aApV WOMV S 1.000, IJrt�wsA=—GATE I3 2,000. I GENL I. GATE LMIiM .ES PER %2OgICTS- CCOPpP AGC f 2.000. I II Pale. FX I PR0. II Loc I (AI Oama RELWNTY IGOIxaa.EEDN Sw L.n s 1.000. emAVwAmrlPVPVO,I IS B IXIAxrNrtO 21UENJB7000 01101116 01101115 iXAU. OWIED SCHEDUED AUTOS xnos NONO D _I _ X {HREOxUTOS X AUtos I I aCOM1Y WNRYIPS avMlj3 PROPERTYMWGE. . j Pp xubn 3 f I X I— a-- I X I OCCUR EACH OCCURRENCE I f 10,000,DDC `AGGREGATE 13 10,000, C I I E'ER I I cuws El AUC594612805 01101114 01101115 QED I X I RETEN $ 01 I ! s D NORNFRS COYPENyTpN xNpELPI ,Rg,Lmrjv Am rNOHtEIOR.CAATMJLEYFCUTNE YO OF C .EI E UDEI (YpF n NH) N NI• I 21WBN03209 I 01101114 01101115 X WCaTAN LOTH - TORTLMIS Et EACH ACCIDENT I s 1,000, ELpISE/SE - EA EYPLOYEE''.f 1.000. FMa[ap pE$CRIPipN OV OPERPipNa GeV., EI. gSE/SE- PYICYLMi3 1.000. E Professional Llab 'AEH2883S800S 08127113 1 08127116 Per Claim 2.000. Claim Made I (RETENTION: $200.000 Aggregate 21000. MwItIPTgN OF OPERATIONS I LOCATIONS I VEWCLES(Aas[ ACOW 101. A6TYImY R rk S $nWW�. H mad&, c8laIp,A —n For bid purposes only cc RTTcir ATP ufO nP. rnurn 1 n CALVING SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE Calvin, Giordano 8 A660Cidte6, THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. Inc 1800 Eller Drive #600 AUTHORIOFn REPRESENTATIVE Ft Lauderdale, FL 33316 ®1988.2010 ACORD CORPORATION. All rights reserved. ACORD 25 (2010105) The ACORD name and logo are registered marks of ACORD - RFQ No. 14 -07 -02 1 Continuing Professional Services 3 Calvin, Giordano 9 Associates, Inc. EX l E P t 1 o N A t s o t n i l o N i IMPLEMENT SERVICE AFTER AUTHORIZED TO BEGIN Calvin, Giordano & Associates, Inc. can commence work on any project immediately upon receiving the Notice to Proceed from the City of Sunny Isles Beach. The staff assigned to this project has the capacity to begin immediately working on the project gathering as- builts and permits. Our survey department staff can place a crew in the field within 48 hours of re- ceiving the Notice to Proceed to begin the design sur- vey. From that point, all other services would follow uninterrupted. Based on our experience with these types of projects and more specifically our permit- ting experience with FDOT and Miami -Dade County on these types of projects, CGA would expect that our team would have an advantage with shorter length of time permitting and fewer RAls than most other firms would. RFQ No. 14 -07 -02 1 Continuing Professional Services 4 e e Calvin, Giordano & Associates, Inc. E% C E P E I O N A t S O L U 7 1 0 N S We began as M.E. Berry & Associates in 1937 and became Berry & Calvin in 1985. Twelve years later, the transformation was made to Calvin, Giordano & Associates, Inc. (CGA). From the beginning, much of our reputation was built on repeat business with clients from the public and private sectors. Our success is reflected in the quality of work we consistently provide and also in the personal approach we take with each client. The winning combination is affirmed by our large number of repeat /long term municipal clients. We focus on adding professionals and technology that address the needs of our South Florida customers instead of simply adding new branch office addresses. Founded in Hollywood, our main office is now in Fort Lauderdale, within Port Everglades. Today, our firm employs over 300 professionals who provide a broad range of planning, civil engineering, construction engi- neering and inspection services, transportation /traf- fic engineering, surveying, permitting, environmental specialty services, electrical engineering, landscape architecture, data technology (including Geographic Information Systems), indoor air quality and build- ing code services. Taking advantage of our diversified staffs experience and knowledge is what distinguish- es CGA as a professional consultant and what allows our team to repeatedly complete projects on -time, un- der budget and exceeding expectations while doing so. The firms municipal experience in South Florida is enviable. We currently or previously served as consultants to many municipalities including Sunny Isles Beach, Bay Harbor Islands, Surfside, Medley, Bal Harbor, North Bay Village, Miami Springs, Miami Beach, Medley, Palmetto Bay, Weston, Pembroke Pines, Miramar, Wellington, Hollywood, Davie, Dania Beach, North Miami Beach, West Palm Beach, Riviera Beach, Lake Park, Lantana, Islamorada, and Marathon. RFQ No. 14 -07 -02 1 Continuing Professional Services S 0 �' Calvin, Giordano 6 Associates, Inc. r. E h C E F r 1 0 N A t S O t U T 1 0 N i 0 LANDSCAPE ARCHITECTURE The Landscape Architecture Department has a unique blend of qualified professionals who provide a variety of interests and personal expertise as an underlay to our Landscape Architectural services. They are educators, community leaders, activists, volunteers, artists, designers, sculptors and LEED Accredited Professionals. This mix of talent allows us to provide our clients with holistic, well- round- ed design solutions that, beyond considering all the functional and implementation - related issues need- ed to be resolved, ensure a design product that, once built, will provide for longevity, experience, value and unique identities essential to establishing com- munity branding. This is supported by our qualified, award - winning staff, including Registered Land- scape Architects with more than 60 years of collec- tive professional experience and by a strong team of supporting experts. CGA's Landscape Architecture Department has con- siderable talent and ability within its ranks and has the resources of the company to provide all ser- vices - expected as well as unexpected - that may be needed during the course of any landscape architec- tural project. The Department has been able to suc- cessfully complete less traditional tasks, including applying for and obtaining grants to fund landscap- ing projects, such as two separate $50,000 grants for roadside landscaping for the City of Weston, and the City of Dania Beach's receipt of a $50,000 grant for median landscape improvements. Customer satisfaction is our primary goal, whether a project involves development or redevelopment, inspection, reporting or design, private client or a public entity. Our broad range of project experience includes: f RFQ No. 14 -07 -02 i Continuing Professional Services • Comprehensive plans • Grant application preparation and process- ing • Historic preservation • Hardscape design • Graphic design and presentation • Trail and open space design • Feasibility studies • Habitat restoration • Vegetative delineations and assessments • Arborist and tree mitigation services • Invasive exotic vegetation monitoring • Development of mitigation options with an opinion of probable cost • Wetland mitigation monitoring • Master Planning • Landscape and site planning • Urban revitalization • Greenway and streetscape design • Recreational facilities design • Environmental impact studies • Site due diligence • Environmental permitting and coordination • Natural resource • Wetland delineations and wetland function- ality assessments • Wetland mitigation plans for 11 Calvin. Giordano 9 Associates, Inc. E X i E P T 1 0 N A E S O E U T I O N i CIVIL ENGINEERING Throughout all phases of a project, CGA makes a com- mitment to provide the utmost levels of quality con- trol and professionalism. We take great pride in seek- ing mechanisms and means through which projects can be sustainable. Streets /Roadways CGA's roadway design experience ranges from small, two -lane rural roadways to large multi -lane highways and interstates. We work with the FDOT (Districts IV and VI) on re- grading, striping, drainage improve- ments, implementation of ADA requirements, turn - lane additions, widening, and median modifications, and public outreach. We have designed street - scape improvements for municipalities such as Dora], Weston, and Bay Harbor Islands. In addi- tion, we have designed and permitted parking improvements such as the Dania Beach Park N Go, and the parking fields for Pembroke Lakes Square, Pembroke Gardens. Related services include: • Roadway design and permitting • Corridor Studies • Intergovernmental agency coordination • Roadway beautification projects • Design alternatives analysis • Lighting design • Parking lot design • Traffic calming measures • Pavement marking and signage • Parking supply and demand analysis • Emergency evacuation studies and planning • Roadway drainage design and permitting • Utility relocation design and coordination • Milling and resurfacing projects • Utilities in Redevelopment Areas Much of CGA's recent engineering experience has con- centrated on the redesign and upgrading of utility in- frastructure in Florida's older coastal communities. Understanding the construction methods and materi- als used 40 to 80 years ago in South Florida is critical to a successful project approach in these areas. Working in historic neighborhoods, we have success- fully carried out design and construction oversight of the complete removal and replacement of existing sewer, water, and storm drainage systems together with new sidewalks and roadways - basically every- thing within the City -owned rights -of -way, plus coor- dination with the landscape and building architects for the new development outside the rights -of -way. Exhaustive research of existing conditions during the initial design phase uncovers many conditions which, if left undiscovered, can result in significant contractor change orders during construction. A good example is the prevalence in many older neighborhoods of War - renite Bitulithic Pavement, a patented design popular in the early 1900's consisting of a thin layer of asphalt over a solid concrete base. Over the course of the last 70 years, many of these streets have been paved over, and without knowledge of this condition, what could be a simple bid item can turn into a costly change or- der in the field. Navigating these issues, along with older, substandard linework and drainage, and the ev- er- present Southern Bell concrete duct banks calls for the type of design expertise and historical knowledge that our team brings to a project. When the few unforeseen conditions do arise, our phi- losophy is to work diligently with the contractor and client to redesign infrastructure at a moment's notice. We understand that downtime on a construction site adds up to serious liability to all concerned. _ � RFQ No. 14 -07 -02 1 Continuing Professional Services 7 Calvin, Giordano & Associates, Inc. E% C E P T 1 0 N A L 5 0 t u T 1 0 N i SURVEYING AND MAPPING CGA's team experience covers a broad spectrum ofland surveying services. Our team has experience working with state, municipal, and private- sector projects. CGA has fully equipped survey crews which can mobilize within 48 hours notice. The Surveying and Mapping Division of CGA uses the latest technology when preparing surveys, including GPS equipment, automated data collection, laser scan- ners, underground utility detection technologies and a vacuum /slurry subsurface excavation system called the VaXcavator that exposes existing underground utilities. Operated by one of the field survey crews, the VaXcavator allows us to obtain subsurface horizontal and vertical locations required for design, in previ- ously developed areas. Additionally, Hypack sofhvare and Odom sounders allow us to offer hydrographic surveying services. By integrating with our Trimble GPS units, the equipment creates a three - dimensional model of the water body being surveyed with tremen- dous accuracy and speed. Diverse capabilities for a wide range of needs The CGA Surveying and Mapping Division is equipped with staff who are best -in- class. Our staff consists of professional surveyors and mappers, CADD technicians and survey crews that perform the following: • Boundary Surveys • Topographical Surveys • Hydrographic Surveys • Route Surveys for Engineering Design • Utility and Infrastructure Layout • GPS (Global Positioning System) Surveys • Record (As- Built) Surveys • Sketch and Scan Descriptions Leica C -10 3D Laser Scanner In the past, detailed survey reports typically took 1 -2 weeks, and several visits to a site. With the Leica C -10 3D Laser Scanner, survey scanning is significantly faster and can reduce the time by up to 50 percent. One Visit, a Full View, Hundreds of Photos Recognizing the value to our clients, CGA was among the first firms in Florida to acquire 3D laser scanning. Our staff can now scan virtually anything in half the time of conventional methods, with a level of detail never before available. The Leica I C -10 3D Laser Scanner can take a virtual, detailed snapshot of a site including ceilings, undersides of bridges, elevated pipe racks, tall facades, columns, and towers - ar- eas that were previously difficult to access. It collects millions of data points of all items in a 360' hor- izontal and 270° vertical field of view, allowing a full field of view. This eliminates an additional visit to capture data not covered in the original scope of work or the question of where a grade elevation was taken on an object. The 3D Laser Scanner captures all the items at once in a per- manent record that can be filed, including hundreds of high quality photos and graphics or animations, from 3D to virtual walk - throughs of sites - ideal for rede- velopment areas, client presentations or commission meetings. For added convenience, the survey data can be exported to whatever format our clients need, whether Auto -Cad, Mircostation, or other software. Trusted by Cities, Utilities, and the General Public Over the last 77 years, the CGA client base has grown to include land development clients, FPL, Florida Department of Transportation, Broward County Real Property Division, and many cities within Broward, Dade and Palm Beach Counties. Whatever the project, CGA goes to great lengths and depths to meet our clients survey needs. GEOGRAPHICAL INFORMATION SYSTEMS (GIS) The Data Technologies and Development Department at CGA have been involved in the full spectrum GIS de- velopment for over 15 years, inclusive of, but not Inv- ited to, data development, data management, QA /QC, generalized mapping, data collection, data analysis, customize GIS web applications, and GIS web hosting, just to name a few. CGA has also been an ESRI Business Partner for over eight years. This partnership allows us to leverage additional resources from the world's in- dustry leader to ensure that our client's needs and re- quirements are met with the highest standards. In an effort to facilitate GIS project requirements, CGA has two network environments specifically dedicated for GIS to provide the highest level of quality service and support. One environment is the production /de- RFQ No. 14 -07 -02 1 Continuing Professional Services 8 Calvin, Giordano & Associates, Inc. E f C E P T 1 0 N A t S O t U T 1 0 N 5 A typical roadway overpass prior to scanning with the ScanSation. velopment environment. This network is setup exclu- sively for development and testing of all data sets and applications before they are delivered to the client. The other network environment is our live environ- ment and is located at a data center. This environment and network is utilized to publish GIS data and custom GIS web applications specifically developed for our clients. As GIS consultants, we maintain, host, develop and back up all of the client's GIS data, while provid- ing an avenue for them to access their information via the web. These separate environments also provide redundancy of all data, while working cohesively with our clients to meet the needs of all projects. ENVIRONMENTAL SERVICES AND PERMITTING The diverse and in -depth work experience of our envi- ronmental staff provides us with a critical understand- ing of current local and regional environmental plan- ning and permitting issues and the historic impacts that have affected the southeast region, as well as the adaptive strategies that will be necessary to address climate change and rising sea levels. CGA's multidis- ciplinary approach is reflected in the integrated part- nership of our environmental department with the many disciplines of our firm. The integration of technical field skills, regulatory details and overall project requirements allows us to address project needs from inceptions to completion. Our environmental staff routinely coordinates details The ScanStation captures an infinite amount of data, including millions of data points for everything visible to the eye, not just the roadway. ScanStation is more accurate, faster and versatile than conventional methods. with owners, developers, design engineers, surveyors, as well as governmental agency. It is our goal to ob- tain reasonable, environmentally sensible solutions for our clients. Ecosystem assessments wetlands, wildlife corridors, endangered plants /animals, critical habitats, salt and freshwater marshes, cypress sloughs, mangrove swamps, lake and estuaries, coastal dunes and upland habitats. • jurisdictional wetland (fresh and saltwater) delineations (USACE, SFWMD, FDEP) • Site development and feasibility studies • Develop new Comp Plan Conservation and Coastal Management Elements, draft plan amendments and conduct evaluation and ap- praisal reports. Develop new data, inventory and analysis • Environmental Impact Assessments • Design wetland mitigation projects, conduct monitoring and compliance reporting • Environmental resource permitting for land development (wetland impacts, lake excava- tions, dredge- and -fill applications) • Consumptive Use Permitting • Draft environmental land development codes • Construction Contract Administration • Grant Administration RFQ No. 14 -07 -02 1 Continuing Professional Services 9 Calvin, Giordano & Associates, Inc. /!J E X C E P T 1 0 N A L S O L U T 1 0 N S SUB- CONSULTANT LANGAN ENGINEERING AND ENVIRONMENTAL SERVICES, INC. Langan provides geotechnical and site /civil engineer- ing and environmental consulting for private develop- ers, public agencies, property owners, and institution- al clients around the world. Langan was founded as a geotechnical consulting com- pany in 1970, and geotechnical engineering remains a core discipline at Langan today. They work closely with clients and the design and construction team to engineer cost - effective geotechnical solutions appro- priate for proposed structures and the governing site conditions. Langan Geotechnical Services: • Subsurface Investigations • Foundation Design • Materials Analysis • Soil and Rock Mechanics • Retaining Structures • Slope Stabilization • Soil Improvement /Ground Modification • Dewatering Design and Permitting • Subsurface Structure Design • Excavation Support and Underpinning Design • Earthquake /Seismic • Geological Mapping of Rock Slopes • Mine Investigations /Studies • Hydrogeology • Earth and Rock Fill Darns • Tunnels /Microtunneling • Seawalls, Piers and Bulkheads • Dredging • Vibration Monitoring • Pre - Construction Conditions Surveys • Value Engineering • Construction Documents • Contractor Support Services • Engineering Services During Construction • Forensic Engineering /Expert Testimony • Cost Estimates Langan works with project teams to provide lead- ing -edge, focused, streamlined investigations and risk -based remediation. They excel in promoting and gaining regulatory acceptance of risk based strategies to obtain cost effective site closures. Langan possesses expertise in a wide variety of projects including state Voluntary Programs, Brownfields, RCRA, State and Federal Superfund, Manufactured Gas Plants (MGP) and Storage Tank programs. Langan Environmental Services: • Risk -Based Corrective Action • Brownfields • Storage Tank Management • Due Diligence Support • Environmental Assessments • Site Characterization • Permitting /Regulatory Approvals • Remediation Design /Oversight • Water Resources /Supply • Hydrological Investigations • Wastewater and Stormwater Permitting • Air Modeling • GIS /Database Management • Environmental Impact Statements (EIS) • Manufactured Gas Plant Remediation Services • Asbestos /Lead -Based Paint Abatement • Management of PCB Containing Materials • Indoor Air Quality/Mold • Demolition • Waste Management • Compliance Auditing • Ecological Risk Assessment • Human Health Risk Assessment • Site Feasibility Studies • Remediation by Natural Attenuation • Expert Witness • Exposure Assessments • Free Product Volume and Mobility Modeling �[tjyj RFQ No. 14 -07 -02 1 Continuing Professional Services 10 Calvin, Giordano & Associates, Inc. E X C E P E 1 0 N A E S a l a r l 0 N S LICENSES StatesFo'f .Filorida Boord'6f Professionol Engineers - :tias..,b, , G. Calym, Giordano & Associates, Inc. FBPI ; m,emm� ,,.e..rs� i� 6- .6mm6rrRm��ms m ps4�mp,btic,b,url, a RoEmo,al Fryrcer, duly Ixead uM CNm , 47L Ibr S... 4,6v ,6R 226201504513 C<rtirxe,e d A,:nsri.arwx $lr State, Of.'FFlorida Board'of Professional Engineers . Atn,v.,hu, - _ DavidyEugene'Stambaugh, P.E. -� hBPE Is licensed as a Professional gFnear under.Chapter 471, Florida Statutes E.pvn. wimi5 - 1 _%,'. „ VLt N w£ w 226mtsn7M '�71 t , l� mm State- icof,`,Fl-orida Boordof Professionol Engineers Thomas Franeis'Lubanovic „P.E. W Is licemed as o Professional gsneer under Chapter 471, norido Statutes E.,,m� W015 t — .1» pr USN A . W. 226201529654 E'rJl, "I t �.� 56659 r"RO,.•aryrF�. L�a�.r� 1 NRf—.l BmEr>or Ras NOW 6a5tsas lltmv cuvaAwRmwR.swa.7ue+c L.� trrs4nwsrzr Fort t.uau,ae. n.3v,..nu wwx non.,, nR„RSUwoF 4,axuna %O fCtSIWLn^ �.T. and Yappe, Ileeaf6 nutm RRUr.rt uws, /1j;�: ��, State o'f,.FFlorida Board of Professional Engineers RotiertF Mcsweeney+P.E. 5. FBPE, Is licensed as a Professional •Engsneer,under. Chapter 471, Florida Statutes 6pira.on: 2262015 a-, -� - 47.El .W. .4dn P:u 2 2 32015 30662 `011 , • 1 •1. 47416 tateo �;Florida Boord-of Professional Engineers ,4 Aacsu.nu, 1 - -- Jena. Ree;Martinetti P:E. _ r Is licensed as a Prof, sional g,neer u�i�iden(]sopter 471, Florida tStatutes E.p",o,ion: 22Pl�JiS ptat Nc Aud'n Na ]22201529.3] ,•t 69035 State OCFIorida Board of Professionol'£ g neers A srs3, tho, c-,, C :j _ Manuel J.bocurro /PEE. ' FBPF "-0' w Is licensed as a Professional ng,nmr under Chapter 471, Florida Statutes. E, m 2211015 Rc ti. Nu . kkwNa sn” Proreia W L Sanr76r am 6W re IYmse yrt. e. vnn.u=v.,n R,.rz aE FIIMb CE WR„R,n aF YIIIREY.,O MaF£3SOR,1L REIiRA,Ox coxnRUn,oR,,,,Ra,Rr tsce4,m+c m.w r4 WRRQ sCEfLAiY ftl11R.,C,011 _. x...4 c.o. scEmmm _ asM1 pAKN dGSw UO F6 ErD+en rY .VG Sf, At6 E, �CR.WU. CeN61CV,ERMUnrtE! cuo. sap,avu s �5sootES ac FaRS,woEROUe�FUVIe RFQ No. 14 -07 -02 1 Continuing Professional Services Q� :r o . fir i s Calvin, Giordano 8 Associates, Inc. E X C E P I 1 O N A I. S O t U T t 0 N i STATE aE ft I OFMIfIIIIt OE 6WP2Y ANO MCirrEWAL REGWIIOY . 6OAIm Or 4N W GrE ARCIg1FCTNE IAMOBCVENCMiECi6V3'.'ESB NveJ rab. llb REGi1 ;;9��trrEO EaeM b6 `x ans C/L•EUSR 4q lf5EplA K `\ 1YOETR MStE R�+6�.- z_�K��`�.�`- I] Q OUTE OF FLORDA MMATE TOT U39i15AM1gRRE]EIONALREGIA.LIYIN 6wRDM LAMOSLIR ARCWtFCtVRF O O .. a l ` Mev'I;d]es\: sm ID S:eti: PROFESSIONAL the WNSfIYE M[MiECI MAIM = -. - xyry Labe NAE REG451EREO O uNentarNep W 9�em WiCinO Pxlees aM Unite pawns p�n�vn 4t f5 EAaAVn¢m RW L, }015 coot Tuerr wwl l eznr `Pb_ pfEECMCBEE R MER NEm KI _ - flIflPLY} M1N ILmsu Y AeYels. atl t me F..Yv titYPYntl.etl V-n_„b .19Pn [Wmn R- relm,)y.'AIS 95 AWY. E\.q EJMn.Eb W )JM4m PniessI=al Smayor sort tlapper Umtt L1b tr p..::m a tTyet +n. FL,tla �. TMOMLsr..',Or.c Iti 1. \' \ \l\Dpp A \'E \liC EVT TISBE'[GFL P.\ IS1ES e-27—� u�u.Nnsl~i.LVU MyKisnN. Licensee Details U.Mee 41E60naliaa N+me: LANGAN ENGINEERINWENWROMMENTAL License-,.: SERVICES,INCtE ., a l Tammy Cook- Weeclon Mev'I;d]es\: LEED ACCREDITED S:eti: PROFESSIONAL CsSY: OUT OF STAII Liege Meli:q: >e On,a�wavg Ne Irew4age ana uNentarNep W 9�em WiCinO Pxlees aM pM'GVet b wLWI Ne use W Ne l£EOe Gr,m Buftlb,nq grlrq Syalrm-. Licensee Details U.Mee 41E60naliaa N+me: LANGAN ENGINEERINWENWROMMENTAL License-,.: SERVICES,INCtE ., a l (6LA Z—. Mev'I;d]es\: RIVEROR.(1NTER3 S:eti: ELMWOOO PARK N. 3e " 074070000 CsSY: OUT OF STAII Liege Meli:q: 07/31/2016 Um Informs Inpi License-,.: Ge61p surineo a l GO li[e'tse M:mOC: 66401 S:eti: CyrtRM,ARiw Lic� Daze: 02/07/2002 Eg : 07/31/2016 spm.l Qlalificab— Q.1M.pon ENeMire ASSOCIATION OF STATE FLOODPLAIN MANAGERS, INC. CERTIFICATION BOARD OF REGENTS Sandra Lee, CFM ASFPM CERTIMI) FLOODPLAIN MANA6ER .......... .,_..,.,....,_,..., ...,,.,...,.,,..,_..�y n.m....._r....on..ry nm.., m...a.,'M..a._.....,.. ofd, i['1`y RFQ No. 14 -07 -02 1 Continuing Professional Services 12 Inpi Sandra Lee LEED AP BUILDING DESIGN , CONSTRUCTION DOD ... _ ... -.. . - GBCI ASSOCIATION OF STATE FLOODPLAIN MANAGERS, INC. CERTIFICATION BOARD OF REGENTS Sandra Lee, CFM ASFPM CERTIMI) FLOODPLAIN MANA6ER .......... .,_..,.,....,_,..., ...,,.,...,.,,..,_..�y n.m....._r....on..ry nm.., m...a.,'M..a._.....,.. ofd, i['1`y RFQ No. 14 -07 -02 1 Continuing Professional Services 12 L �G " Calvin. Giordano & Associates, Inc. c I E% C E P t 1 0 N A I S O L U T 1 0 N 9 ... of FLORme, oEMRierEMi of BVSWESS AW FR(FESSmNAL REm no" Strom of YROFESSOMAL oF0.ofii$ 5 ,.e )Q J esm ssm u CfoLOriSJ M.em. anLSrc _ LLdr Fa pwmu dtnryY, r9} F$ Ep�O! LIJI, TJi6 9'EC,M. WmEt k— CERTIFICATE OF STATUS State of Florida Department of State I certify fiom Ne scads of this office that CALVIN, GIOI DANO & ASSOCIATES. INC. is a cerporaion orInnmud wider tM Iaws of the Sute of Florida fled on Jane' 7. 1995. The document number of flit capamion is M 17373. 1 fimler cenify thin sad cerputim liti; paid all fees dne du, offce d ot,;h December 31, 2014, Nit its mon recem annntl repoNnniforrn Wsiress term wits filed m Jz-mas 9. 2014, and its stmiu is active_ I finlher certify Nit sad caporaim has Iry filed Ande'OfDesoftiion . r,.r. M.er.q aemnr 0, c„m.s,w.fb cqi fJe mTerlYawr.6r g164 a4 br.r:b e,• •12�.r. au Secretary of State ..umlo c<w�mom ore.,r6l. Wit. -moll ICt.1.LT ..—Wit m.wuMOrae. m. ew�s.,.44ss,e State of Florida Board of Professional Engineers Arrms rhw Langan Enaineerina And Emir Sm Inc l31'1_ mn6wved vMn the pm.viam d Smne LM'%:d, storing, re offer mpeeetiq,m're m de wb6c rMmSh a hafmcva Fninm.6�.. - , v.ir bepur tlh fb:dR R «aru Nit 22SM15102W Cenifmte of A"vnrci cisi State of Florida Deparonent of State 1 cenify from the teems• of ibis office Elise LANGAN ENGINEERING AND ENVIRONMENTAL SERVICES, INC. iF a New Jersey mris"ien mahaized to t.. business in Ne Store of Flmda. q®bfi d on Minch 16, 1993. The dummem nornterofthiscupautim is F92, 0 WIM9. I (unlit cenif) tha .mod caps"aim hes paid an fees due Nis off., ilu veh December 31, 2014, tha its must recent eentil tepJn'mif em Wvrrss reps" was filed on Jemmy S. 2014, arcl as nines is ani,x. I fmhr ccnify Nor and cerpuaum la. not filed a Certificate of w uhmawa. CM. oLrgYa0s16e aTm ,dsae, ils:w n EtMmer, b, CglnL 64 s, ctuaMN.Je.on:u+ • °me..s Secretary of State a•Yelm ID tCa m9r9Sq ie.,m,.YM,mnrr,msM,.m o-rtln..Mm .m,ma lo, ,ef .bit rtlM m, ewaLL® 4gbJN eap,r.rm.®Ln .c...am.,.rw RFQ No. 14 -07 -02 1 Continuing Professional Services 13 Calvin, Giordano & Associates, Inc. E% C E P i 1 0 N A L 5 0 L U T 1 0 N 5 OCCUPATIONAL LICENSES 11:5. A,.p.�5 Aw. Rm. M100. FL 1s.EVd.b. R 333011SD5 - S5.-0S1�000 VALM OCT0eER 1,2013 THROUGH SEFTENBER N n14 �wN.,.:-w,vl. ,:a•r,»T . wsz« -,.rTS :x aa�, TYr.: >n,cY .ur� a.r e,Nx.0 tmm,.:,u ..LS, e. a wreeumR:rnlep.ceee >.. Eunl9en Ceb: S..1n♦.Rw:,.. ,a. ,.,, 1.. - ...�R....e+ .....Arm TN RECEIPT KUST BE POSTED CONSPICUOUSLY IN YOUR PLACE OF BUSINESS iMi RCKP.111 RECL1I1 i1nm.,n..b.. pm.QPb{Pwu.M1. Be+.CaN, .O• INma Aa.� 2013 - 2014 RELEVANT EXPERIENCE See the following pages for relevant project experi- ence. Local Business Tax Receipt Miami -Dade County, State of Florida ILLBT. -rRnb rqt • e51 -ao Not rAr 5331 we .taSVUNAYVLOCATKN, rlcvrNU EXPIRES CALV014000ANO A ASSOCIATES INC NENFNAL SEPTEMBER 30,201- 97K155T 5568M HOWSTEAD R 3030 ru..mrtmer tm O,¢ AM 5610 uc T1F5 OF ARTIV RS I161etI VYm IVYYy[rIBII...Ye AP.R�rldS�la. lY S�eY: rrl /..M4r61Y511r' .rlra�rrl. r1Y�U� /pr,.rw.r. r,.��erar�r5re , RFQ No. 14 -07 -02 1 Continuing Professional Services 14 N rJn , Calvin, Giordano & Associates, Inc. ��! E E C E P T 1 0 B A L S O L U T I O N S N 0 NEWPORT FISHING PIER Sunny Isles Beach, Florida The City had already completed several CIP projects with CGA, so when it came time to select the turn -key Project Managers for the Newport Fishing Pier demolition, design, permitting and reconstruction. The design and permitting of the pier required coordination with FDEP, DRER, USACE, USCG, MD Fire Department and the City's building department. The scope of work also included site inspections, vibration & settlement monitoring, and the administration of all budgets, claims, change orders, RFI and contract addenda. After successfully permitting the pier, CGA managed the demolition of the existing pier and the construction of the 776 -foot long pier, which included a 6,200 sf restaurant and second story lifeguard office and observation tower. The pier decking was placed atop 24 "x24" precast- driven piles. The project also required the design, permitting and installation of new utility lines from Collins Ave. CGA is proud to announce the Newport Fishing Pier opened on time and $127,000 under budget with a grand opening party being held on the pier on June 16, 2013. Client City of Sunny Isles Beach Contact information at time of project: Bill Evans Asst City Manager 18070 Collins Ave Sunny Isles Beach, FL 33160 (305) 947 -0606 Project Date 2011 -2013 Services Provided Project Management Permitting Construction Services Surveying Support Services Principal -in- Charge Dennis J. Giordano Team Members Joel Wadsworth, CGC Chris Giordano, MSC CO_0003 SIB NEWPORT FISHING MUM I is Calvin, Giordano & Associates, Inc. F% C E P T 1 O N A L S O L U T 1 0 N 5 HERITAGE PARK GARAGE Sunny Isles Beach, Florida The City of Sunny Isles Beach requested Construction Consulting services for the Heritage Park Garage & Park construction. The improvements included a six -story 490 - space garage, nearly four acres of landscaped park complete with elevated stage, pavilion, seat-walls, interactive water fountain and commemorative wall. CGA's services included owner's representation comprising of on -site documentation of progress, conducting weekly construction progress meetings with contractor and City, documenting progress to the City and review and comment on all contractor change order requests. Client City of Sunny Isles Beach Contact information at time of project: Rick Conner City Manager Jorge Vera Asst City Mgr Gio Batista Public Works Director 18070 Collins Avenue Sunny Isles Bch, PL 33160 (305) 792 -1912 Project Date 2009-2011 Services Provided Construction Management Consulting Principal in Charge Dennis J. Giordano Project Manager Joel T. Wadsworth Team Members Chris Giordano CS_0014 HERITAGE PARK GARAGE_SIB.DOC 1 16 FLAGLER MEMORIAL MONUMENT SOLAR LIGHTING Miami Beach, Florida This project was awarded to CGA on June 5, 2014 and involves the design and specification of a solar lighting system to illuminate the historical Flagler obelisk monument on Flagler Memorial Island. Constructed in the early 1920's by Carl Fisher as a memorial to Henry H. Flagler, the monument has required numerous restoration efforts in its history. The original lighting for the monument was installed in 1940 as part of one of the first restoration projects. Over the years, other projects have added fill material to protect the monument, removed graffiti, installed a security perimeter fence, and resurfaced the monument. In 2002, the island was officially designated as a historic site by the City of Miami Beach Historic Preservation Board. The proposed solar powered system will replace the existing grid -tied FPL service to the island (a submarine cable) which was frequently being damaged by boats and watercraft. Funding for the project is being provided by a combination of the City of Miami Beach, the adjoining Star Island homeowner's association, and FPL. The project is currently under design by CGA electrical staff and is expected to begin construction in the Fall of 2014. Client City of Miami Beach Contact information at time of project: Edgar Zapata Contract Coordinator Public Works - Property Management Division edgardzapata@ miamibeachfl.gov 1245 Michigan Avenue Miami Beach, FL 33139 P:(305)673- 7000x2964 Project Date June 2014 Services Provided Electrical Engineering Survey (3D- Scanning) Principal -in- Charge Dennis J. Giordano Team Members Manny Docurro, PE Steve Watts, PSM Greg Clements, PSM Keith Brien EL_0009 FLAGLER MONUMENT SOLAR LIGHTING.DOC 1 17 Calvin, Giordano 5 Associates, Inc. r E x C E P T 1 0 N A t S O L U T 1 0 N 5 FLAGLER MEMORIAL MONUMENT SOLAR LIGHTING Miami Beach, Florida This project was awarded to CGA on June 5, 2014 and involves the design and specification of a solar lighting system to illuminate the historical Flagler obelisk monument on Flagler Memorial Island. Constructed in the early 1920's by Carl Fisher as a memorial to Henry H. Flagler, the monument has required numerous restoration efforts in its history. The original lighting for the monument was installed in 1940 as part of one of the first restoration projects. Over the years, other projects have added fill material to protect the monument, removed graffiti, installed a security perimeter fence, and resurfaced the monument. In 2002, the island was officially designated as a historic site by the City of Miami Beach Historic Preservation Board. The proposed solar powered system will replace the existing grid -tied FPL service to the island (a submarine cable) which was frequently being damaged by boats and watercraft. Funding for the project is being provided by a combination of the City of Miami Beach, the adjoining Star Island homeowner's association, and FPL. The project is currently under design by CGA electrical staff and is expected to begin construction in the Fall of 2014. Client City of Miami Beach Contact information at time of project: Edgar Zapata Contract Coordinator Public Works - Property Management Division edgardzapata@ miamibeachfl.gov 1245 Michigan Avenue Miami Beach, FL 33139 P:(305)673- 7000x2964 Project Date June 2014 Services Provided Electrical Engineering Survey (3D- Scanning) Principal -in- Charge Dennis J. Giordano Team Members Manny Docurro, PE Steve Watts, PSM Greg Clements, PSM Keith Brien EL_0009 FLAGLER MONUMENT SOLAR LIGHTING.DOC 1 17 Calvin, Giordano & Associates, Inc. E % C E P T 1 O N A 1 5 0 t U T 1 0 N 5 UTILITY REHABILITATION PROJECT Surfside, Florida Calvin, Giordano & Associates, Inc. (CGA) managed the Utility Rehabilitation Project from start to finish. The project consisted of investigating the existing potable water, storm sewer and sanitary sewer systems while identifying and performing cost benefit analyses on each required improvement. The potable water system investigation included fire Flow analysis, coupon sampling and as -built review. The new system was designed to increase / maximize available fire Flow, and replace deteriorating or known problem areas within the existing system. The project also relocated the back of yard water services and meters with front yard services, which included AMR (microwave readable) water meters, which resulted in a operating cost savings to the Town. Service sizes were increased to provide for both domestic and landscape water meters thus allowing for a savings to the water charges. The final design included the replacement of over 32,000 LF of water main, 1,587 water services, 1,278 new water meters and 46 additional fire hydrants. The sanitary sewer system analysis included video analysis of the existing gravity system, Inflow /Infiltration (1 /I) testing, and a review of water consumption vs sewage transmission. Based on the system analysis and facility design life, over 50,000 LF of sanitary sewer main was CIPP lined or replaced. In addition, the Town's two (2) sewage pump stations were completely rebuilt with updated and more efficient pumps including SCADA controls. The force mains from the pump stations to the shared transmission main were also replaced. The Town has observed the post construction reduction in I/I has reduced their monthly sewage transfer and disposal costs by over 30 %, thus bringing the Town back into compliance with the County issued Consent Decree. The storm sewer system was upgraded to include three (3) SCADA controlled pump stations, nine (9) shallow injection drainage wells, twenty (20) control structures and the required RCP pipeline to interconnect the existing gravity drainage system with the newly installed pumped well system. Recent analysis has shown that the utilization of pressure wells has reduced the TMDL discharge into Biscayne Bay by 90 %. The reduction in TMDLs was a key requirement in obtaining the over $1Million in FDEP grant funding. CGA also administered the installation of over 45,000 LF of curb and gutter replacement as well as 167,000 SY of asphalt roadway resurfacing. CGA assisted the Town by obtaining the required funding for this project, which included the Miami Dade Building Better Communities General Obligation Bond, FDEP Grants, Regions Bank publically bid bond issuance and the FDEP's State Revolving Loan Program. ENG 0095 SURFSIDE UTILITY REHABILITATION.DOC Client Town of Sudside Contact Information at Time of Project Bill Evans (786) 350 -8190 Project Date 2010 — 2013 Services Provided Survey VI Testing and Analysis Subsurface Utility Engineering (SUE) Permitting Granl/Bond Management Bidding Assistance Sanitary Sewer Design Storm Sewer Design Potable Water Design Streetscape / Traffic Calming Design Utility Hardening/ Undergrounding Coord. Public Information Officer (PI0) Construction Management Principal in Charge Dennis J. Giordano Project Manager Chris Giordano, MSC Team Members Bob McSweeney, PE Curt Keyser, PE James Hart, PE Greg Clements, PSM Bruce Bernard Ryan Spradlin It. Calvin, Giordano 8 Associates, Inc. E x C E P T 1 0 N A L 5 0 L u T 1 0 N S 92oc1 STREET PARK Bay Harbor Islands, Florida As a component of the Town -wide parks and open space master plan discussions moderated by CGA, an under - utilized parking lot was converted to a park space. The program for the park included an open green lawn area that could serve for multiple functions and a dedicated dog run area. Under a very tight and demanding schedule, CGA designed, permitted and provided construction administration services for the entirety of the park. At its core, the park design sought to establish an urban relationship with its surrounding walk -to context. The design provides an urban plaza that is open and accessible at all times, in addition to the multi -use field and dog areas, which are only open during daytime hours. The design was articulated to provide as much space as users can personalize with various seating options to facilitate visitors' use of the facilities, as well as exercise equipment, doggie agility equipment, water fountains, solar - powered lighting and ample use of shade. Client Town of Bay Harbor Islands Contact information at time of project: JC Jimenez Asst. Town Manager 9665 Bay Harbor Terrace Bay Harbor Islands, FL 33154 (305)866 -6241 ciimenez bayharborislands.net Project Date 2010 Services Provided Park Master Planning Landscape Design Site Furnishing Construction Administration Permitting Project Manager Tammy Cook- Weedon, ASLA, RLA, LEED AP Team Members Gianno Feoli, ASLA, AIA LA 0033 BH192ND ST PARK.DOC 1 19 Calvin, Giordano & Associates, Inc. E X C E P T I O N A L S O L U T 1 0 N 5 COMMUNITY ENHANCEMENTS Bay Harbor Islands, Florida Calvin, Giordano & Associates, Inc. worked closely with Town Staff to devise a strategy for improving the qualities and character of the Town's west island's neighborhood, something the Town had been struggling with for over five years prior to contracting CGA. CGA was successful in providing the necessary services to get public support for the project, design the roadway and landscape improvements, and oversee all aspects of the construction. The project consisted of engineering and landscape improvements that upgraded the residential streets in the form of milling and resurfacing of the roadways, lighting, planted and irrigated bulb -outs and signage throughout. While the scope of the project is similar to others in nature that CGA has performed, this project stands out as one where CGA's heavy involvement in marketing, graphics and conflict resolution took center stage. These skills aided CGA in facilitating approval of the final design strategy. CGA's experience in negotiating discussions to arrive at compromises proved to be the winning strategy, coupled with their excellence in providing comprehensive services to deliver a complete project. Client Town of Bay Harbor Islands Contact information at time of project: Ron Wasson Town Manager 9665 Bay Harbor Terrace Bay Harbor Islands, FL 33154 (305) 866 -6241 rwasson@ bayharboris Ian ds. n et Project Date 2009 Services Provided Urban Design Principal in Charge Dennis J. Giordano Project Manager Tammy Cook - Weedon, ASLA, RLA, LEED AP Team Members Gianno Feoli, ASLA, AIA Michael Conner, ASLA, RLA Marcos Mendoza Patrick Figurella, PE LA_0085 8HI COMMUNITY ENHANCEMENTS.DOC 1 20 Calvin, Giordano & Associates, Inc. E x C E P T 1 0 N A L S O L U T 1 0 N S OAKLAND PARK STATION PLAZA Oakland Park, Florida CGA was contracted by the City of Oakland Park to design a public plaza at a prominent location within the City's Culinary District. The public plaza is the linchpin to the newly established District's catalyst for redevelopment, serving as a connective means and threshold to a brewery being proposed in a presently vacant industrial building. The goal of the plaza's design was to meet the goals of the District's master plan in contributing spaces of value for social, public use to increase the pedestrian experiences being lent by the District. Additionally, the plaza provides ample areas and infrastructure to serve as the designated location for future street markets — this includes ample electrical connection stations, a flexible elevated area that can be used as a stage area, and ample outdoor seating opportunities through the use of elevated planters with seat walls. The design of the plaza required very close attention to detail design to ensure that the quality of the space was of a high architectural quality, consistent with the initial branding strategies already embarked by the City. Lastly, the project was conceived, design and developed through a cooperative process with the assigned City officials, the developers and adjacent property owner, lease and their contractor, and finally with the City- selected contractor contracted to build the plaza project. This coordination was a highlight of the project which ensured that the design ideas were clearly communicated and translated into the implementation phase, that all in- building needs were met and scheduled so as to not conflict with the plaza's tight construction schedule, and that the continuity and balance of design elements was achieved between the public space and the improvements proposed by the adjacent building in terms of design treatments, color, signage and motifs. Client City of Oakland Park Contact Information at Time of Project Harvey Rambarath, Assistant Director Engineering & Community Development City of Oakland Park 5399 North Dixie Highway; Suite 3 Oakland Park, FL 33334 (954) 630 -4478 Fax: (954) 229-0422 harveyf@oaklandpafHl.gov Project Date 08/2012 — 1172012 Services Provided Landscape Architecture ( Hardscape & Planting) Civil Engineering Surveying Principal in Charge Dennis J. Giordano Project Manager Gianno A. Feoli Team Members Tammy Cook - Weedon, RLA, ASLA, LEED AP BD -C Roberto Roush, PE LA_0115 OAKLAND PARK STATION PLAZA.DOC 1 21 LANGAN SERVICES: Pre- Tender and Proposal Support • Support During Contract Negotiations • Geotechnical Engineering • Geotechnical Interpretative Report GBRJGDR Comparison Report Support During Differing Site Conditions Claim and Disputes Observation and Monitoring During Support of Excavation Installation Observation and Monitoring During Foundation Element Installations Observation, Monitoring and Post- Treatment Testing During Grouting Trials for Pre- Treatment LOCATION: Miami, Florida CLIENT: Florida Department of Transportation STRATEGIC PARTNERS: Bouygues Travaux Publics Jacobs Engineering Group Hybfid,Mixed Face Tunnel Boring Machine �TBM) PORT OF MIAMI TUNNEL J pi P= The purpose of the Port of Miami Tunnel (POMT) will be to relieve traffic congestion in downtown Miami by diverting car, truck, and bus traffic from nearby highways directly to the Port of Miami through twin 42-ft diameter tubes extending below the main ship channel. This project will be the first large- diameter tunnel constructed in Florida's challenging soft sedimentary geology using a tunnel boring machine (TBM). Project procurement utilized a concession approach in which the concessionaire would be responsible for financing, designing, building, and operating the tunnel. As a consultant to the concessionaire's design and construction team, Langan evaluated the subsurface data to develop the geotechnical engineering parameters required for design of the bored tunnel and the TBM. Additionally, Langan provided recommendations for cut-and-cover construction, temporary retention systems, tie-down anchors, bridge foundation support and retrofit, roadway construction, and TBM spoil disposal. Langan also provided support during the pre-tender phase, assisted with technical proposal preparation, and assisted with contract negotiations. Subsequent to contract award, Langan observed and monitored early-phase testing consisting of foundation load testing and Cutter Soil Mixing for the U-wall and cut-and- cover portions of the project, as well as numerous grouting trials for the bored tunnel portion of the project to densify, modify or reinforce the ground to facilitate tunneling with the selected hybrid TBM system. Cutter Soil Mix System for SCE Grouting Trial for Pre-Treatment r7i LANGAN SERVICES: • Subsurface Investigation • Geotechnical Engineering • Foundation Recommendation /Design • Construction Engineering Inspection & Testing • Site Preparation Specifications LOCATION: Hallandale, Florida CLIENT: Diplomat Properties, L.P. ARCHITECT: Sandy & Babcock Architects DIPLOMAT RESORT & COUNTRY CLUB The Diplomat Resort and Country Club is a 5 -Story gulf resort located in Hallandale, Florida overlooking the Intracoastal Waterway and its golf course. Surrounding the hotel are one to two story buildings, including a clubhouse, spa, and pro - shop, a subterranean maintenance level and other resort amenities. Substantial raising of grades by 8ft to 10ft within highly compressible ground conditions would have proven to be a continual maintenance problem if the structure was supported on pile foundations as required by the local Hallandale City Building Ordinance. Langan's involvement and discussion with the city allowed the structures and surrounding critical on -grade features to be supported on shallow foundations after removal of organic compressible material and backfilling with granular fill material. Other resort amenities including tennis courts, etc. and parking area /access roadways were preloaded to minimize post- construction settlements and prevent the need for a continual maintenance program. 23 LANGAN WESTIN DIPLOMAT HOTEL, CONVENTION CENTER AND RETAIL SERVICES: • Subsurface Investigation • Geotechnical Engineering • Foundation Design • Marina Foundation Design • Construction Inspection & Testing • Dewatering Consultation • Exfiltration TrenchlStormwater Retention Evaluation • Specialized Lightweight Fill Design LOCATION: Hollywood, Florida CLIENT: Diplomat Properties, LP ARCHITECT: Nichols Brosch Sandoval & Associates iy9:7_r1*0 Lei 7_\: »21x:71 De Simone Consulting Engineers To date, the Westin Diplomat project is the largest private project ever constructed in Florida. The project consists of 40- story twin hotel towers, eight -story convention center, an intracoastal retail village, garage, mechanical plant and pedestrian bridge. Extensive subsurface investigations were performed to delineate the layers of compressible organic silts, peats and soft rock below the project site. These subsurface conditions, together with the fast track schedule of the project, complicated design and installation of foundation systems and required specialized site preparation techniques. Augercast pile foundation recommendations were developed to support the low -rise, mid -rise, and high -rise structures. Over 3,000 piles were installed to support these structures. Langan provided foundation design, quality control inspection of foundation systems and foundation monitoring services. Additionally, Langan provided seawall foundation recommendations and inspection services, earthwork, site preparation recommendations and inspection services, innovative deep stormwater exfiltration trench evaluation and design, and specialized lightweight filling techniques. The use of a geofoam lightweight fill allowed significant raising of grades on top of existing settlement- sensitive utilities and adjacent to an on -grade condominium slab. 24 LANGAN SERVICES: • Geotechnical Engineering Study • Deep Foundation Load Testing • Pile Installation Observation • Pre - Construction Conditions Survey • Vibration Monitoring • Dewatering Consultation • Litigation Support LOCATION: Sunny Isles Beach, Florida CLIENT: Regalia Beach Developers, LLC ARCHITECT: Arquitectonica [ .' 111; 7-\ 1 *0 [ON ;7i 1:719 11 :1 : t : 3 DDA Engineers, P.A. REGALIA CONDOMINIUM TOWER Rendering courtesy of Regalia Beach Developers, LLC This 44 -story luxury condominium is located in the northernmost end of Sunny Isles Beach, where excessive settlements of high - rise towers have been observed and documented. The tower is abutting the property of an existing single - family residence, and is only about four feet away from the structure and other amenities. Our geotechnical recommendations addressed any adverse impacts of the proposed construction to the adjacent residence. Langan provided foundation - related services, including a geotechnical engineering study, deep foundation load testing and installation inspection, and a detailed building settlement analysis. Additionally, Langan provided vibration monitoring and dewatering consultation, and conducted a pre - construction conditions survey. Langan's expertise has enabled the project to be designed on a deep foundation system to accommodate anticipated building settlement without using excessively -deep auger cast -in -place piles. Langan also provided litigation support services in frivolous lawsuits initiated by the northern neighbor prior to construction. zs LANGA/V FORT LAUDERDALE /HOLLYWOOD INTERNATIONAL AIRPORT T-4 REMEDIATION SERVICES: • Work Plan Development • Geotechnical Evaluation of Soil Conditions • Soil Pre - characterization • Well Installation and Abandonment • Open- excavation Air - sparging • Environmental Observation During Construction LOCATION: Fort Lauderdale, Florida CLIENT: Cummings - Balfour Beatty Langan is contracted by Cummings - Balfour Beatty, the CM- at -risk, to provide environmental services during utility construction in a petroleum- impacted area near the western gate of Fort Lauderdale /Hollywood International Airport. The services include: • Characterizing soil before excavation to determine which soil can be reused and which soil must be removed for off -site disposal • Providing a geotechnical evaluation of soil conditions; • Developing a comprehensive work plan for the entire project • Developing a baseline of groundwater quality in advance of construction • Abandoning monitoring wells in the construction footprint • Observing the removal and segregation of impacted soil • Sparging the open excavation to remove volatile petroleum compounds • Reinstalling and sampling monitoring wells after construction The project is expected to be completed in the spring of 2014. Because this is an active airport, much of the work has to be done at night when airport traffic is lighter. 26 LANGAN SERVICES • Construction Dewatering Consultation, Design and Permitting • Environmental Consulting • NPDES Stormwater Permitting LOCATION: Miami, Florida CLIENT: Florida Martins, L.P. Hunt Moss Joint Venture Suffolk Construction Baker Concrete MARLINS BALLPARK AND PARKING GARAGES Photo Courtesy of David Brantley The project involved the construction of the Marlins Ballpark and surrounding four parking garages. The site, the former Orange Bowl, was contaminated by arsenic in the soil and groundwater. The groundwater was very shallow and required dewatering to enable construction. Excavations were to occur in the Miami Limerock, which is highly permeable but not suitable for many methods of dewatering. Multiple contractors retained Langan to provide dewatering design and permitting services for multiple phases of the foundation and utility construction at the entire project site. Langan designed a construction dewatering system that treated the highly turbid dewatering effluent for both suspended solids and arsenic. The system consisted of open sump pumps that were pumped into on -site exfiltration trenches or deep wells. Langan permitted the dewatering system with the Miami Dade County Department of Environmental Resources Management and South Florida Water Management District. The team also permitted the use of drainage wells to receive the effluent with the Florida Department of Environmental Protection. In addition, Langan provided consultation and testing services regarding the management of on -site contaminated soils and imported fill. Langan's services allowed the project begin on time and the system worked successfully, allowing dewatering to continue without ceasing for permit violations. The work was conducted on a highly accelerated schedule to comply with Major League Baseball's opening day requirements. 27 LANGAN AVENTURA MALL EXPANSION - NORDSTROM & PARKING GARAGE 14AZIT11614.-51 • Phase I Environmental Due Diligence • Subsurface Investigation • Geotechnical Engineering Study • Geotechnical Engineering Inspection During Construction LOCATION: Aventura, Florida CLIENT: Turnberry Associates ARCHITECT: JPRA Architects a —! I I- II r' l �f Aventura Mall is one of the nation's most recognized mall destinations. Langan has recently completed a comprehensive 300,000 SF, S22 million renovation of its facilities. The project included a three -level 232,500 GSF mall expansion, a two -level 167,000 SF Nordstrom's Department Store, a four -level 2,000 -car parking garage, and associated site improvements. Design and construction was fast - tracked to allow grand opening before the 2007 holiday shopping season, while minimizing impact to the active mall facility. Langan's familiarity and experience as the geotechnical engineer of record for the original mall development resulted in the proposed expansion and Nordstrom's department store being supported on cost - effective shallow foundations. The parking garage was supported on short, high- capacity auger cast piles. 0 LANGAN SERVICES • Phase I and 11 Environmental Site Assessments (ESA) • Geotechnical Subsurface Investigation • Geotechnical Engineering and Foundation Recommendations LOCATION: Homestead, Florida CLIENT: City of Homestead ARCHITECT: Rodriguez and Quiroga Architects Chartered I iI N `­L -0-0-0-0 -o oo-o°o-oo°_° i °° 00 0 0 o 0_ o 000_ob_oo_o_000 _000 oo H�wbhwU CT' HALL HOMESTEAD CITY HALL The new Homestead City Hall project consists of a new 3- story, approximately 80,000 SF building that will be used for housing the administrative facilities for the City of Homestead Municipal Government, including a 230 -seat auditorium and council chambers. The project also includes an open plaza and new surface parking lots. Langan performed Phase I and Phase II Environmental Site Assessments (ESA) as part of an ongoing continuing services contract with the City of Homestead. The Phase I ESA identified some potential environmental concerns associated with both on -site and off -site recognized environmental conditions. A limited Phase 11 ESA was performed to evaluate the potential impact to the site from these conditions. Langan also performed a subsurface investigation and provided foundation recommendations for the design of the new facilities. Economical shallow spread footing foundations were recommended for support of the structure. In addition, percolation tests were performed to obtain the soil permeability data required for the design of the stormwater drainage system. 29 °a 0 Calvin. Giordano 8 Associates, Inc. E X C E P i 1 0 N A t S O I U E 1 0 N S PROJECT MANAGER EXPERIENCE Mr. Robert McSweeney, PE, has more than 25 years of local experience in South Florida including municipal engineering, civil engineer- ing along with related plan- ning, permitting, design and construction administration. His main focus over the past 14 years has been in the ser- vice of municipal and gov- ernmental clients. This work has involved large scale FDOT and County roadway projects including an inter- change construction on the HEFT (Homestead Exten- sion of Florida's Turnpike), NW 12th Street Widening (Miami -Dade County), and the Hillsboro Boulevard Streetscape project (Deerfield Beach); utility infra- structure upgrading and neighborhood improvement projects including storm water (drainage) systems, drainage pump stations, water main upgrades and replacements, gravity sanitary sewer system replace- ment and lining, reuse water main installations, sew- er pump station(s) replacements and rehabilitations, and transmission force main replacements, and traffic calming improvements; and Municipal engineering, development review and representation. Sample engineering design and /or construction ad- ministration projects include the Surfside drainage pump stations, Fort Lauderdale Harbor Beach Neigh- borhood Utility Improvements, Pompano Beach 24" reuse water main (one mile in length through a resi- dential neighborhood), Pompano Beach island bridge replacement project, Plantation bridge /culvert re- placement project, Dania /Meadowbrook drainage pump station, and Weston roadway resurfacing and traffic calming projects. He understands the necessary efforts and intricacies in serving and managing munic- ipal clients and regulatory agencies as well as dealing with the public and acting as a liaison to the Commis- sion, municipal staff, residents and business owners. These efforts include the process of overseeing the design, management and construction of scheduled improvements, and ensuring final completion of the project for a successful close -out. See below for a detailed description of some projects Mr. McSweeney has performed. • Fort Lauderdale Neighborhood Improve- ments Projects (Estimated Construction Cost(s) $9M): (2004 - 2007) Construction Administrator for neighborhood improvement projects including drainage improvements/ modifications, utility installations (water mains /services, water transmission mains and force mains, and bridge utility crossing replacements), utility rehabilitations (sanitary sewer gravity main and lateral lining /CIPP, lift station rehabilitation /reconstruction), road- way restoration and reconstruction, traffic calming and intersection improvements, road- way lighting, landscaping and irrigation, and pavement markings and signage. • City of Pompano Beach Reclaimed (Reuse) Main (Estimated Construction Cost $2.2M): (2007- 2008) Contract Manager /Engineer of Record / Construction Administrator for S,000 LF of 24" reuse transmission main and asso- ciated distribution mains and services located within an existing residential neighborhood involving directional bore installation and open cut, complete roadway restoration, and Swale improvements. • Deerfield Beach Hillsboro Blvd. (S.R.810) Roadway Corridor Improvements (Estimat- ed Construction Cost $6.SM): (2007 - 2010) Engineer of Record /Contract Administrator, project included engineering design for re- construction and improvements to approx. 4,800 linear feet of roadway (Hillsboro Bou- levard/S.R. 810) from Federal Highway to S.R. A -1 -A. Improvements included roadway cross- ♦{( t RFQ No. 14 -07 -02 1 Continuing Professional Services 30 Calvin. Giordano 6 Associates, Inc. E X C E P T I O N A L 5 0 L U T 1 0 N S slope correction, underground utilities adjust- pavement markings and signage, landscaping, ments /relocations, drainage improvements, bridge deck cleaning, and utility adjustments. mast arm/ signalization, utility coordination and coordination of undergrounding utilities, Bob's specific expertise includes: safety improvements, landscape and streets - cape elements, and decorative street lighting. • N.W. 12th Street (Estimated Construc- tion Cost $4.8M): Miami -Dade County, FL, (2000 - 2002), West of N.W. 107th Avenue to East of N.W. 136th Avenue: Senior Project Administrator for the roadway construction and /or widening of a multi -lane divided sec- tion including bulkhead /seawall installation, culvert(s) extensions, roadway foundation stabilization (geo- textile installation), con- crete barrier wall installation, drainage, utili- ty installations (water main and force main), railroad crossing modification, signalization, roadway lighting, landscaping and irrigation, and pavement markings and signage. • N.W. 12th Street /HEFT Interchange (Es- timated Construction Cost $5.6M): Mi- ami -Dade County, FL, (2000- 2001), con- nection with the Homestead Extension of Florida's Turnpike (HEFT): Senior Project Administrator for the intersection connection of the mainline HEFT to N.W. 12th Street (ex- cluding toll booth buildings) including ramp connections, two (2) flat slab bridges crossing Snapper Creek Canal, drainage improvements (including lake construction), concrete barri- er wall, utility installations (water main, force main including aerial crossings, and lift sta- tions), signalization, roadway lighting, land- scaping and irrigation, and pavement mark- ings and signage. • Palmetto Expressway (S.R. 826/N.W. 167th Street) FDOT Milling and Resurfacing Proj- ects (Estimated Construction Costs $7.1M): Miami -Dade County, FL, (2000- 2001), North of N.W. 154th Street to West of the Golden Glades Intersection: FDOT Senior Project Adminis- trator for the milling and resurfacing of the mainline, ramps and adjacent frontage roads (N.W. 167th Street) and intersections for three (3) concurrent /adjoining FDOT projects. The work involved included milling and resurfac- ing, concrete barrier wall modifications, sig- nalization improvements /modifications, road- way lighting, overhead signage installation(s), -_I RFQ No. 14 -07 -02 1 Continuing Professiona Has experience in the prioritization and im- plementation of various capital improvement projects for many municipalities Extremely knowledgeable in public works and engineering standards as well as environmen- tal and building code regulations Has assisted in the preparation of design crite- ria packages for a variety of projects Acted as contract Town Engineer for three (3) years issuing permits, performing inspec- tions, preparing capital budgets, attending staff and commission meetings, designing and managing capital projects including: roadway, environmental, drainage, landscaping, under- ground utilities Experienced in construction management and inspection Has over 26 years of experience in civil and en- vironmental engineering with specialization in utilities infrastructure design Able to review change orders, project pay re- quests, schedules and submittals, as well as provide contract administration and quality control, and Has worked extensively with permitting agen- cies including various municipalities, county planning, environmental and health protec- tion departments, the Florida Department of Environmental Protection, the Florida's Water Management Districts, the U.S. Army Corp of Engineers and the U.S. Environmental Protec- tion Agency Based on his experience, Mr. McSweeney understands the unique and common challenges municipalities and governmental agencies face due to budget projec- tions and restrictions, schedules, and constituency ex- pectations. He is abreast of regulatory requirements, innovative design and construction technologies, scheduling, cost estimating, construction contract re- quirements, reporting and administration. Also being acutely aware of construction constraints and design parameters allows him to promptly assist in providing recommendations due to encountered conditions, and to negotiate and review potential contract changes. I Services 31 Calvin, Giordano 6 Associates, Inc. E a C E P T 1 0 N A L 5 0 L U T 1 0 R S CONTRACT MANAGER Chris Giordano, MSC will serve as the Contract Manager for CGA and Sunny Isles Beach. He is an accomplished strategic planner, leader, and construction /capital projects and facility manage- ment specialist with more than 10 years of experience 'serving an instrumental role in the de- livery of top quality, multimil- lion- dollar capital improvement- municipal projects. He has smoothly organized and driven the perfor- mance of teams of up to 100 individuals and contrac- tors, establishing a collaborative work environment to ensure the timely, quality, and within budget delivery of key ventures. He has achieved superior level of staff performance by providing team members with the re- sources, guidance, support, and motivation to surpass objectives while maintaining top safety levels (OSHA Certified). His primary leadership and supervisory force is in the areas of infrastructure projects as well as marine construction and engineering. He routine- ly secures government approval /permits, plans and monitors site development, controls budgets, sched- ules work, hires consultants and contractors, coor- dinates construction phases, and ensures the safe / timely / cost effective / quality completion of all proj- ects. Giordano has liaised, worked closely with, and managed attorneys, architects, engineers, government representatives, subcontractors, superintendents, foremen, labors, purchasing specialists, bookkeepers and customer service representatives. Below are a brief summary of Mr. Giordano's success- fully completed projects: • Town of Surfside - Infrastructure Rehabilita- tion project: $23,635,000 • Sunny Isles Beach - Newport Fishing Pier & Restaurant: $5,000,000.00 • Town of Surfside - Community & Aquatic Center Construction: $5,000,000 • Labadee, Haiti - Cruise Ship Pier and Termi- nal Construction: $12,000,000 • M.O.L. Dames Point Expansion - Container Ship Terminal Expansion: $8,000,000 RFQ No. 14 -07 -02 1 Continuing Professional Services 32 Calvin, Giordano 8 Associates, Inc. E S C E P T 1 0 N A t S O t u T 1 0 %15 ORGANIZATIONAL CHART Tammy Cook - Weedon, RLA ASLA, LEED AP BD +C Gianno Feoli Calvin, Giordano & Associates, Inc_ Manny Docurro PE CaMfn, Giordano & Associates, Inc RESUMES See following pages for resumes. CITY OF SUNNY ISLES BEACH Dennis 1. Giordano Calvin, Giordano & Associates, Inc Chris Giordano, MSC Calvin, Giordano & Associates, Inc Bob McSweeney, PE Galvin, Giordano & Associates, Inc David Stambaugh, PE Jenna Martinetti, PE Calvin, Giordano & Associates, Inc Sandra Lee, AICP, CFM, CEP LEED AP BC +D Calvin, Giordano & Associates, Inc Thomas Lubanovic, PE Calvin. Giordano & Associates, Inc. Steve Watts, PSM Greg Clements, PSM Keith Brien Calvin, Giordano & Associates, Inc. Daniel Spector, P.G., LEP Langan Engineering & Environmental Services __- RFQ No. 14 -07 -02 1 Continuing Professional Services 33 0 0 0 • 0 • 0 0 • 0 0 • 0 0 0 0 0 0 0 0 • • 0 0 0 0 0 0 • 0 0 • 0 0 0 0 0 0 0 0 0 0 0 Il" Calvin, Giordano X C E P T 1 0 N A r/ 8 Associates, Inc. S O L u 7 1 O N i Robert McSweeney, PE Director of Construction Engineering and Quality Assurance SUMMARY OF QUALIFICATIONS Mr. McSweeney's broad and diverse background entails extensive experience with civil and environmental engineering firms providing service to both public and private sector clients in Miami -Dade, Broward and Palm Beach counties. His experiences also involve municipal representation, FDOT Utility Coordination and construction administration, and design /consulting for the U.S. Air Force. At CGA, Mr. McSweeney's responsibilities include municipal engineering, civil engineering along with related planning, permitting, design and construction administration. As Director of Construction Services, he works to ensure all projects, both public and private, continue to meetCGA's high standards for constructability and quality. He providesservice to both public and private sector clients in and outside the Tri -County area. PROJECT EXPERIENCE Miscellaneous Engineering Services Contract, Town of Surfside, Florida. Acting Town Engineer /Engineer -of- Record for an ongoing continuing services contract providing general engineering services to the municipality. These services include Commission meeting representation, development plans review and development review meetings, Right -of -Way permit applications reviews, utility coordination, utility franchise agreement coordination, Consent Decree engineering services, and Engineer of Record construction completion certifications. Projects provided under this contract included the $23M Town -wide utility infrastructure rehabilitation program (water, sewer, drainage, roadway resurfacing and pump stations improvements) and the Biscaya Island Drainage Improvements. Miscellaneous Engineering Services Contract, Pompano Beach, Florida. Contract Manager /Engineer -of- Record for a continuing services contract providing general engineering, and surveying and mapping services to the municipality on an as- needed basis. Projects provided under this contract included reclaimed /reuse water main design and construction administration, Pompano Beach Sidewalk Construction Program, facility assessment reporting, municipal pier renovation inspections, Sample McDougald House site design, Broward County/Pompano Beach Branch Library site engineering design, golf course decorative wall design, and bridge and culvert improvements. Miscellaneous Engineering /Surveying Services Contract, Deerfield Beach, Florida. Contract Manager /Engineer -of- Record of a continuing services contract providing as needed general engineering, and surveying and mapping services to the municipality on an as- needed basis. Projects provided under the contract included: • State Road AlA'S' - Curve Phase II Roadway, Utility and Beautification Project • Intersection improvement design of Goolsby and Hillsboro Boulevards, and Goolsby Blvd. roadway improvements • Intersection improvement design of Century and Hillsboro Boulevards • Main Beach Parking Lot Expansion • Cove Shopping Center Parking Lot Redevelopment Hillsboro Boulevard (SR 810) Improvements, Deerfield Beach, Florida. Engineer -of- Record /Contract Administrator; project included surveying and engineering design for reconstruction and improvements to 4,800 linear feet of roadway (Hillsboro Boulevard/ SR 810) from west of Federal Highway (U.S. 1) to west of State Road AlA. Improvements include roadway cross -slope correction, undergrounding of aerial utilities, drainage Calvin, Giordano 6 Associates, Inc. E X C E P T 1 0 N A L S O L U T I O N S Robert McSweeney, PE, Page 2 improvements, mast arm /signalization, utility coordination, safety improvements, landscape and streetscape elements, decorative lighting, bid assistance and construction administration. Coconut Creek High School, Deerfield Beach High School and Blanche Ely High School, Broward County, Florida. Engineer -of- Record, Project Coordinator and Construction Engineering Manager for multiple stadium enhancement contracts to include all civil engineering and land surveying services for the project, facilitated through a design /build firm and funded by the School Board of Broward County. Project involvement included complete civil engineering design and permitting associated with the new stadium /bleachers and concession building, football field grading and drainage, running track configuration, high jump and long jump configuration, pole vault and discuss configuration, security fencing, storm water management system, and construction administration /inspection /certification. Parkland Commons Commercial Development, Parkland, Florida. Engineering Manager for the complete engineering design, platting, permitting and construction administration for a 40 -acre commercial development. Project also involved substantial offsite roadway improvements on University Drive, and joint use agreements with the School Board of Broward County. Port Everglades Cruise Terminal 4, Broward County, Florida. Engineering design and permitting of a parking lot expansion program including resolution of existing drainage inadequacies and overall site utility redesign. The utility improvements design included upgrading the existing stormwater management system and complete water distribution systems, in addition to the redesign /reconfiguration of the overall parking area. Downtown Davie, Davie, Florida. Contract Manager /Engineer -of- Record for the engineering design, permitting and construction administration for a 12 -acre, light density, mixed -use (residential, retail and office development) project in Davie. Project included legal depositions and expert witness testimony towards resolving drainage issues with adjoining property. Golden Acres Apartments, Pompano Beach, Florida. Contract Manager /Engineer -of- Record for this affordable housing project with 302 units completed in two phases, Golden Square and Golden Villas. Project tasks included preparation and processing of the site plan, platting, surveying, design and permitting of the water, sewer and drainage systems, roadway design and permitting, utility coordination, and construction administration services. Elementary School A (Sunrise, Florida), School Board of Broward County, Florida. Engineer -of- Record for this new elementary school encompassing design through construction. Complete civil engineering design, permitting, construction inspections and administration services were provided /performed. Improvements included complete site development, paving /grading /drainage systems, potable water /sanitary sewer systems, and pavement marking and signage. A second school, Elementary School Z in the City of Parkland using the same prototype building plan, was designed /constructed concurrently with this project. Tri -Rail Double Tracking Corridor Improvements. Engineer -of- Record /Utility Construction Manager for a portion of this large -scale project involving planning, permitting, and engineering for the expansion of multiple stations and supporting infrastructure in the tri- county area. The project improvements included new /reconfigured station parking lots and associated stormwater management systems; utility infrastructure improvements including modifications and new facilities for both water distribution and sanitary sewer systems; drainage system modifications and connections including large scale box culvert construction observation, utility, drainage and roadway improvements. The project was a fast -track design /build initiative that involved numerous governmental agencies, municipalities, utility companies (both public and private) and drainage districts. Broward Boulevard Bridge Improvements, East of West Tropical Trail to East of University Drive, Plantation, Florida. Senior Project Administrator for the replacement of two bridges connecting to Broward Boulevard with aluminum arch culverts (Con -Span) including bridge demolition, drainage modifications, intersection and roadway modifications, milling and resurfacing, signalization modifications, roadway lighting, landscaping and irrigation, and pavement markings and signage. 35 0 0 • B �G > Calvin, Giordano f E X C E P T I O N A 8 Associates, Inc. i 0 L U T I 0 N i Robert McSweeney, PE, Page 3 Wiles Road Extension, West of Lyons Road to West of Florida's Turnpike, Broward County, Florida. Senior Project Administrator for the roadway extension of a multi -lane divided section including drainage, utility installations (water main, gravity sewer, force main and lift station modifications), signalization modifications, roadway lighting, landscaping and irrigation, and pavement markings and signage. NW 12th Street, West of NW 107th Avenue to East of NW 136th Avenue, Miami -Dade County, Florida. Senior Project Administrator for the roadway construction and /or widening of a multi -lane divided section including bulkhead /seawall installation, culvert(s) extensions, roadway foundation stabilization (geo- textile installation), concrete barrier wall installation, drainage, utility installations (water main and force main), railroad crossing modification, signalization, roadway lighting, landscaping and irrigation, and pavement markings and signage. SR 7 (US 441), South of Griffin Road to South of Stirling Road, Broward County, Florida. Senior Project Administrator for the roadway reconstruction and widening of a multi -lane divided section including drainage modifications /retention area construction, signalization, roadway lighting, landscaping and irrigation, and pavement markings and signage. NW 12th Street /HEFT Interchange, Connection with the Homestead Extension of Florida's Turnpike (HEFT) Miami -Dade County, Florida. Senior Project Administrator for the intersection connection of the mainline HEFT to NW 12th Street (excluding toll booth buildings) including ramp connections, two Flat slab bridges crossing Snapper Creek Canal, drainage improvements (including lake construction), concrete barrier wall, utility installations (water main, force main including aerial crossings, and lift stations), signalization, roadway lighting, landscaping and irrigation, and pavement markings and signage. Palmetto Expressway (SR 826/NW 167th Street), North of NW 154th. Street to West of the Golden Glades Intersection, Miami -Dade County, Florida. FDOT Senior Project Administrator for the milling and resurfacing of the mainline, ramps and adjacent frontage roads (NW 167th Street) and intersections for three concurrent/ adjoining FDOT projects. The work involved included milling and resurfacing, concrete barrier wall modifications, signalization improvements /modifications, roadway lighting, overhead signage installation(s), pavement markings and signage, landscaping, bridge deck cleaning, and utility adjustments. NW 40th Street, West of NW 54th Avenue to East of SR 7 (US 441), Coconut Creek, Florida. Construction Administrator for the roadway widening and modifications of a divided section including drainage modifications/ improvements, intersection modifications, utility installations (water main and sewer services), landscaping and irrigation, and pavement markings and signage. 36 Calvin. Giordano & Associates, Inc. E X C E P T 1 0 N A L S O L U T 1 0 N i Chris Giordano, MSC Director of Management Services SUMMARY OF QUALIFICATIONS Chris Giordano has nine years of construction management experience. After graduating from the University of Central Florida with a Bachelor of Science in Electrical Engineering Technology, he pursued a career in the construction management industry. Chris held the positions of Project Administrator, Project Manager, Contracts Manager, and finally Project Controls Manager for the Orion Marine Group before deciding being appointed Project Administrator at Calvin, Giordano & Associates, Inc. Chris has managed hundreds of millions of dollars in construction. The clients for these projects ranged from federal, state, local and private clients. Chris gained construction experience throughout the southeastern United States as well as in the Caribbean. PROJECT EXPERIENCE Director of Management Services - Governmental Services. Calvin, Giordano, & Associates, Inc., Fort Lauderdale, FL. • Coordinates and Assist in the Management of all Government Contracts • Manages the Production of Bid Documents, Responses to RFIs, and Bidding Process • Recommend Award of Contracts to City Commission • Manage the Contractor's Submittals, Payment Applications, Claims, Change Orders • Ensure Contractors are Maintaining Current Schedule and Budget Goals. • Manage and Direct all Required Subconsultants and Inspectors as Needed Capital Improvement Projects Managed: • Town of Surfside Utility Rehabilitation Project • Town of Surfside Community and Aquatic Center Construction • Town of Surfside Comprehensive Traffic Study and Analysis • Town of Surfside Seawall Inspection, Design and Reconstruction • Sunny Isles Beach Newport Fishing Pier Project Administration and Permitting • Sunny Isles Beach North Bay Road Bridge Project Administration and Permitting • Port Sutton Manatee Observation • Jupiter Maintenance Dredging Manatee Observation • Tampa MATOC Dredging Manatee Observation PROJECT CONTROLS MANAGER & CHIEF ESTIMATOR Orion Dredging Services, LLC, Jacksonville, FL. (2008 - 2009) • Create and Present all PSR & PCSR Reports for Division, Primavera Progress Schedules, Cost and Revenue Forecasts, and Direct Cost and Schedule Support to Project Managers. • Perform all Bid Estimates for Federal, State, Local, Private and International Projects. • Forecast Every Project on a Monthly Basis and Present Findings in Monthly PCSR Meetings. • Managed Multiple Public Works Contracts Concurrentwith PCM & Estimating Duties. Marine Construction Projects Managed: • Pier Construction and Cruise Ship Berth Dredging - Waterside Improvements, Labadee, Haiti. • USACE Blount Island Emergency Dredging for Navy Ship Traffic and Mooring - Jacksonville, FL • TPA FY 08 Maintenance Dredging for Commercial Ship Traffic and Mooring - Tampa, FL • Port Everglades Maintenance Dredging for Commercial Ship Traffic and Mooring A p7g, Calvin . Giordano & Associates, Inc. E x C E P T l 0 `1 A t 5 0 E U T 1 0 N i p ® Tammy Cook - Weedon, ASLA, RLA, LEED AP ® Associate, Director of Landscape Architecture ® SUMMARY OF QUALIFICATIONS Ms. Cook - Weedon leads the Landscape Architectural staff, founded on her over 2S years ® of Landscape Architectural experience with demonstrated strengths in creative design, ® graphic presentations, and planting design. She has successfully completed numerous large scale projects which encompassed design studies, planting designs, and the various intersecting professions and tasks necessary to manage the projects through to comple- ® tion. ® PROJECT EXPERIENCE ® North Shore Neighborhood Improvements, Miami Beach, FL ® Landscape Architect ® Client: City of Miami Beach: Implemented the City's BODR and designed the planned improvements, including character landscaping, streetscapes, parking, lighting, ADA ac- 0 cess and waterline replacement for more than eight miles of urban, neighborhood corri- ® dors. ® Hickory Point Recreational Facilities, Tavares, FL ® Landscape Architect Client: Lake County Water Authority: The project consisted of the site design of a wa- ® terfront park that included marinas, boat ramps, wetland educational boardwalks, envi- ® ronmental signage, fishing stations and a communal pavilion. ® Kane Concourse Beautification, Bay Harbor Islands, FL O Landscape Architect Client: Town of Bay Harbor Islands: Developed streetscape improvements for the • town's business district, including specialty paving, street furnishings, wayfinding, land- 0 scape planting and irrigation, with particular attention to maintaining the existing Miami ® Modern architectural quality as a branding element of the corridor. ® Joe DiMaggio Children's Hospital Visitor's Clubhouse, Hollywood, FL ® Landscape Architect /Project Manager Client: Memorial Healthcare System: Prepared the site and landscape design for a re- 0 storative garden with a playground area specifically for the use by children users of the ® Joe DiMaggio facility. ® Gator Run Park, Weston, FL • Client: City of Weston: Passive park design for a S -acre community park including light- 0 ing improvements, continuous walking paths, children's play equipment, planting and ir- rigation design. The design provided a butterfly garden and shade structures in proximi- ® ty to and to build strong connections with the adjacent elementary school. ® Deering Estate at Old Cutler, Palmetto Bay, FL ® Client: Miami -Dade County Park and Recreation Department: Historical restoration ® and landscape design to repair the damaged areas of the estate following Hurricane An- drews devastation of the property, including detailed archaeological planting design, hab- itat restoration and planting design for a new visitors' facility. ® Sombrero Beach Park, Marathon, FL ® Client: City of Marathon: Park master plan and design for the creation of a beach -front ® park with dune access, volleyball courts, playgrounds, beach amenities, dune and turtle nesting habitat restoration. B A O • B B B B e A NCalvin. Giordano E X C E F T 1 O N A & Associates, Inc. i O E u T 1 0 N i Tammy Cook- Weedon, Page 2 Eagle Point Park, Weston, FL Client: City of Weston: Passive park design for a 4 -acre community park including lighting improvements, contin- uous walking paths, children's play equipment, planting and irrigation design. Redlands Fruit and Spice Park, South Dade, FL Landscape Architect /Project Manager Client: Miami -Dade Park and Recreation Department: Botanical garden design showcasing the relationships between agriculture and culture, with particular attention to creating an around - the -world thematic design with thoroughness in details about planting arrangements, cultivated species and spatial qualities. Miramar Parkway Landscape Improvements, Miramar, FL Landscape Architect /Project Manager Client: City of Miramar: Prepared conceptual designs for gateway features at the entrance into the city. The de- signs included architectural elements, branding, urban greenways and character planting. Patricia A. Mishcon Athletic Field, North Miami Beach, FL Landscape Architect Client: City of North Miami Beach: Developed site design for an active park facility with multiple fields that estab- lished a strong connection to an adjacent linear park housing the city's annual Italian Festival. Corridors Beautification Master Plan, Weston, FL Landscape Architect Client: City of Weston: Developed master plan and landscape design for planting and branding along all major thoroughfares of the city, including lighting and gateway features. Campus Support Facility, Miami, FL Landscape Architect /Project Manager Client: Florida International University: Provided courtyard design for passive outdoor uses, including a water feature, bronze sculpture, planting and irrigation design through careful coordination with the architectural char- acter of the surrounding building. Biscayne Boulevard Improvements, North Miami Beach, FL Landscape Architect /Project Manager Client: City of North Miami Beach: Prepared branding, planting and irrigation design services in coordination with FDOT The project also included landscape treatments around the existing FPL substation and all coordination of its components. Cooper City Sports Complex, Cooper City, FL Landscape Architect /Project Manager Client: City of Cooper City: Designed an active park with roller hockey rinks, soccer and baseball fields, lighting, restrooms and concessions. An important consideration in the design was establishment of a strong, legible con- nection to the surrounding neighborhoods and including both a fire station and a police station. 39 O O O O O O O O O O O O • O O O • O O O O O O O O O O O 0 Calvin, Giordano V' Associates, Inc. E x c E r T 1 0 N A E S O [ U T I O N i Gianno Antonio Feoli Landscape & Urban Design, Branding SUMMARY OF QUALIFICATIONS Mr. Feoli leads the Landscape Department in creative design strategies for urban environments with specialties including urban design, contextual analysis and branding. He also conducts most of CGA's master planning, transit - oriented designs, community participation efforts and graphic commun ication services. His experience has encompassed a wide array of project -types, and his strengths lie in park design, streetscapes and urban interventions, and form -based urban designs and planning strategies. PROJECT EXPERIENCE Beachwalk Master Plan, Surfside, FL Project Manager, Lead Designer Client: Town of Surfside: Master plan of a 1 -mile linear park that connects all street -end plaza components with access to the beach, including dune and turtle habitat restoration, branding sculptures, salt - tolerant character plantings, and specialty paving design. 92nd Street Park, Bay Harbor Islands, FL Project Manager, Lead Designer Client: Town of Bay Harbor Islands: Site design and landscape design of a 2 -acre urban community passive parkwith a dog run area, Flexible open space, branded planting design, urban plaza and furnishings. Peace Mound Park, Weston, FL Lead Designer Client: City of Weston: Developed a design for a waterfront passive park that celebrates the existence of an archaeological Tequesta Indian burial mound. The design sought to reflect the presence of the burial mound with elements abstracted from the Tequesta way of life and belief. Dora] Boulevard Beautification Master Plan, Doral, FL Project Manager, Lead Designer, Workshop Facilitator Client: City of Doral: Streetscape and urban design fora 4 -mile stretch of Doral Boulevard, creating planning zones, access management design recommendations, signage and gateway features, stipulating architectural relationships to improved sidewalk design and parking design recommendations. Miami Gardens Town Center, Miami Gardens, FL Project Manager, Lead Designer, Workshop Facilitator Client: City of Miami Gardens: Developed and TOD and Town Center design for over 100 acres of derelict and underutilized urban contiguous areas in preparation for the mass - transit MetroRail expansion and its new station scheduled at the site. The project consisted on the development of planning and design standards and ordinances that allowed for balanced densities to supportthe public transit system and a new commercially viable, walkable community. � J Calvin, Giordano Associates, Inc. E F i E P i 1 0 N A L S 0 L U 7 1 0 N i David Stambaugh, PE Senior Project Manager SUMMARY OF QUALIFICATIONS With more than seven years of construction experience followed by eight years of design and project management, Mr. Stambaugh has developed a strong understanding of the engineering profession and necessary skills to successfully complete projects. He is experienced in the design of public and private engineering projects, including the design and expansion of water and wastewater treatment plants, design of sewage collection and transmission systems, water distribution systems, surface water management systems, roadways, and parking lots. PROJECT EXPERIENCE WATER AND WASTEWATER TREATMENT PLANT DESIGN /BUILD SERVICES Water Treatment Plant #3 Degasifier #3 and Odor Scrubber, Palm Beach County, Florida. Responsible for management of all professional consultant activities necessary to provide design build services to the Palm Beach County Water Utilities Department related to the addition of Degasifier #3, replacement of the existing odor scrubber system and structural modifications to the Clearvell #1. The new Degasifier #3 will work in conjunction with existing Degasifiers #1 and #2 and will be provide with a cleaning system to services all three degasifiers. This project required coordination with another construction contract that will be provide a new permeate pipeline to be connected to new and existing degasifiers. Water Treatment Plant #9 SCADA Towers, Palm Beach County, Florida. Project manager responsible for providing design build services to the Palm Beach County Water Utilities Department. This project includes the installation of a new tower to improve the existing Supervisory Control and Data Acquisition ( SCADA) system communication with wellfields and sewer pump stations. The tower will also provide the platform for a new automatic meter reading system that will enable access to real time information on the potable water distribution system. Responsibilities include preparation of the plans and specifications, permitting with applicable regulatory agencies, construction inspection, final certifications and project close -out. Morikami Reclaimed Water Storage and Pumping Facility, Palm Beach County, Florida. Manages all professional consultant activities necessary to provide design build services to the Palm Beach County Water Utilities Department. The scope of work for this project includes the conversion of an existing potable water facility to a reclaimed water facility. This required the addition of a sodium hypochlorite injection system to maintain the required chlorine residual in the reclaimed water before distribution in order to meet regulatory compliance. Other modifications include replacement of the outdated electrical and instrumentation /controls system and rehabilitation of the existing mechanical equipment. Water Treatment Plant #3 Chemical Containment Area, Palm Beach County, Florida. This project included the design, permitting and construction of a bulk chemical storage tank for corrosion inhibitor storage, modifications to the existing containment structure and tank discharge piping to feed the existing metering pumps. The project was designed to meetall applicable regulatory agency requirements for use in a potable water treatment and also chemical storage in a wellfield protection area. Wastewater Treatment Plant Blower Replacement, Pembroke Pines, Florida. Provided engineering design services as part of a design build team for the replacement of the existing multistage centrifugal blowers with high speed turbo blowers to improve efficiency for delivery of process air for treatment of the City's wastewater. As the engineer Calvin, Giordano & Associates, Inc. E X i E P T 1 O N A L i O L U T I 0 N .< David Stambaugh, PE, Page 2 of record, the services included preparation of plans and specifications for permitting and construction, review of shop drawings and final certification. Wastewater Reclamation Facility Expansion Design /Build project, Miramar, Florida. Prepared plans and specifications for the addition of an aeration basin, clarifier, process air blower and deep well injection pump. Assisted with the preparation of a guaranteed maximum price proposal to the City of Miramar. Secured permit from governmental agencies having jurisdiction over the project. Provided documentation of work progress during construction and assisted with project scheduling, equipment startup, preparation of the record drawings and final certification of construction completion. Water Treatment Plant Improvements Phase 111, Pembroke Pines, Florida. Coordinated equipment start up for an upflow treatment unit, lime slaker, multi -media filter, ion exchange color removal system, and sodium hypochlorite storage and injection system. Designed a carbon dioxide storage and feed system. Prepared record drawings, project closeout documents and certification of construction completion packages to governmental permit agencies. WATER AND WASTEWATER TREATMENT PLANT DESIGN Alternative Water Supply Project, Pembroke Pines, Florida. Provided project management for the preparation of the design criteria package for advanced wastewater treatment through the best available technology, including reverse osmosis and advanced oxidation, for the reclamation of secondary treated wastewater suitable for aquifer recharge. Implemented a pilot testing program for the evaluation ofthe selected treatment processes to demonstrate the ability to meet regulatory requirements. Managed overall pilot operations, which included equipment delivery, start up, operation, collection of samples for laboratory analysis and preparation of the final report. Wastewater Treatment Plant Expansion Phase IV, Davie, Florida. Assisted with the design of plans and specifications for the addition of a package treatment unit and associated equipment for the expansion of the wastewater treatment plant. East Water Treatment Plant Improvements, Miramar, Florida. Assisted with the submission of plans and specifications for the addition of a lime sludge handling facility and modifications to the administration and control building for the City of Miramar during the bid process. Water Treatment Plant Risk Management Plan, Pembroke Pines, Florida. Assisted with the preparation of a Risk Management Plan to prevent and minimize the impact of an accidental release of chlorine gas. Provided training for operations personnel on the standard operating procedures. Prepared submittal to the United States Environmental Protection Agency for compliance with 40 CFR Part 68 Chemical Accident Prevention Provisions. UTILITY ENGINEERING DESIGN Lloyd Estates Drainage Improvements, Oakland Park, Florida. Administered all project scope of services for the design of an improved stormwater manager system to aid in the reduction of Flood duration and elevation during storm events within the Lloyd Estates neighborhood. The improvements include the addition of emergency Flood gates to prevent the elevated water level in the SFWMD C -13 canal from Flowing into the Sleep River that provides water storage for the existing drainage system. In addition, a stormwater pump station will be provided to regain the permitted discharge capacity of the system. Grant services were provided for this project that resulted in approximately $4 million of funding from the FEMA Hazard Mitigation Grant Program. Bid Pack 8 Infrastructure Improvements, Oakland Park, Florida. Coordinated team activities as the project administrator to design and permit approximately 18,000 linear feet of water replacement, rehabilitation of Lift Station B -1 and installation of 4 sewer combination air valves to alleviate undesirable air inside the City's sanitary sewer forcemain system. Bid Pack 9 Infrastructure Improvements, Oakland Park, Florida. Served as the project manager and engineer of record for the replacement of approximately 20,000 linear feet of watermains, three lift stations and three separate forcemains that have reached the end of their useful life. The project also included the design of a new drainage system as well as the optimization of the existing drainage system to provide the much needed stormwater management for the residents. Coordinate meetings with the residents within the project area to assist with the understanding of the project goals and address their concerns. 42 Calvin. Giordano & Associates, Inc. E X C E P T I O N A L 5 0 L U T 1 0 N 5 ® Jenna Martinetti, PE Senior Project Manager ® SUMMARY OF QUALIFICATIONS Ms. Martinetti has nine years of engineering experience and has worked on projects from ® inception to project close out including supporting documents and coordination between O all involved parties. Ms. Martinetti is project manager for projects within the City of Dania ® Beach and City of Hallandale Beach related to water, wastewater, and stormwater infra- structure improvement projects. Her project management experience includes design of ® water mains, sewage force mains, lift stations, fuel station, site design and stormwater ® projects as well as permitting, preparation of specifications and bidding documents, en- gineering during construction and project close -out. She also assists it] grant writing and supporting documentation for FDEP and FEMA grant applications and is familiar with ® FEMA's latest benefit cost analysis software. ® In addition, Ms. Martinetti's highway design experience includes design for milling and resurfacing, widening, reconstruction, safety improvement projects, ADA upgrades and compliance, drainage improvements, signing and pavement markings, traffic control • plans, and storm water pollution prevention control plans. Her experience also includes ® utility coordination, participation in the quality control process, electronic delivery, and local agency program (LAP) coordination. ROJECT EXPERIENCE tormwater Projects: allandale Beach NE Quadrant Drainage Improvements, Hallandale Beach, L. Project Manager for the rehabilitation of the drainage system within the City of allandale Beach's NE Quadrant. The project includes modifications and additions to Te existing collection system, the installation of two new pumping stations, storm ,ater force mains and injection wells, and relocation of existing utilities in conflict. he sixteen new wells will be pressurized with fifteen (15) feet of head in order to roduce the necessary discharge into the G3 aquifer. FDEP and the Broward County nvironmental Resource Department and FDEP have permitted the project. Permitting, idding and award, engineering during construction, construction services and project ose out are also included. This project is funded entirely by FEMA HMGP grant funds. 010 -2012, Project Manager, Client /Reference: City of Hallandale Beach, Richard Labinsky, E. (954) 457 -3042 a Basin S Stormwater Master Plan, Dania Beach, FL. Ms. Martinetti is project manager ® for design and permitting for the improvements contained in the recommendation of the ® Storm Water Master Plan of Basin S. The proposed drainage improvements consist of four ® duplex pumpstations, morethan 2 0,000 linearfeetofhighercapacitystormsewerto i mprove storm water conveyance, more efficient discharge outfall systems and exfiltration trenches ® to improve area water quality. The retrofitted drainage system within the Basin 5 drainage ® areas attenuates the storm water runoffand reducesthe frequencyand duration offlooding. 2009 -2012, Project Manager, Client/ Reference: City ofDania Beach, Dorninic E Orlando, PE. ® (954) 924 -3740 ® Site Design Projects: Sage Beach Condominium, Hollywood, FL Project Manager and FOR for civil site design for condominium complex located east of AIA on Hollywood Beach. Design and permitting included replacement of the water main, coordination of utilities, drainage design including a closed system with wells and exfiltration trench as well as offsite ® roadway improvements for the two sites separated by South Surf Road. 2012 -2013, ® Project Manager, Client /Reference: PMG, Ned White, 305- 917 -1070 F_ 11 ►J Calvin, Giordano Or Associates, Inc. E 1 C E P T 1 0 N A t S O E U T 1 0 N S Jenna Martinetti, Page 2 Dania Cove Park Improvements, Dania Beach, FL Project manager for the design and installation of park im- provements including a pedestrian pathway, 2 picnic pavilions, benches, picnic tables, educational and entrance signage, and trash receptacles for Dania Cove, aka Fuzzy Bunny Park, in Dania Beach. The city needed design, per- mitting and construction completed in 13 months in order to meet the deadline for two separate grants funding the project. The project also included shoreline restoration using sheet pile wall, environmental and stormwater permitting, site grading, grant administration, and landscaping improvements. The project was completed in time for the City to receive the entire grant funding available for reimbursement. 2010 -2012, Project Manager, Client/ Reference: City of Dania Beach, Mark Felicetty, Director of Parks and Rec. (954) 924 -6800 Water and Sewer Projects: Water Main and Force Main Subaqueous Crossing of the Dania Cut -off Canal, Dania Beach, Florida: Project manager and FOR for the replacement of the existing water and sewage force mains under the Dania Cut -off Canal via horizontal directional drill to accommodate the proposed dredging of the canal. Also included is the replacement of an additional 1200 LF of the existing mains on NE 7th Avenue up to NE 10th St. to accommodate the future airport expansion and NE 10th St. extension projects. 2010 -2012, Project Manager, Client /Reference: City of Dania Beach, Dominic F. Orlando, PE. (954) 924 -3740 Water Main replacement on NE 2nd St., Dania Beach, Florida: Project Manager for the replacement of 1300 LF of existing water main in a residential neighborhood including replacing all water services, connections to the existing main and fire hydrants. 2010 -2011, Project Manager, Client/ Reference: City of Dania Beach, Dominic F. Orlando, PE. (954) 924 -3740 Dania Beach Public Services Fueling Station: Project Manager for design and construction of a new public services fueling station in compliance with all local and state codes including recent changes to secondary containment requirements. The station includes key card access for City employees and remote monitoring of the fuel station. Also included was the permitting and licensing of the new station and removal of the existing fueling station, a new 2,000 gallon above ground storage tank for a generator on site, bidding and award, engineering during construction, and project close out. 2009, Project Manager, Client /Reference: City of Dania Beach, Dominic F. Orlando, PE. (954) 924 -3740 Lift Station 15 Rehabilitation, Dania Beach, Florida: Project Manager for the rehabilitation of lift station 15. The project included complete rehab of the existing wet well, installation of two submersible chopper pumps to alleviate problems with ragging, a new valve box, control panel and a permanent stand -by emergency generator. 2009 -2010, Project Manager, Client /Reference: City of Dania Beach, Dominic F. Orlando, PE. (954) 924 -3740 Lift Station Rehabilitation, Dania Beach, Florida: Project Manager for the rehabilitation of five lift stations within the City of Dania Beach. Three of the stations are conversions from the can -type station to a submersible lift station while the other two are pump replacements. All stations include rehabilitation of the existing wet well, installation of a valve box, new control panels, a stand-by emergency generator, fencing and landscaping. Permitting, bidding and award, engineering during construction, construction services and project close out are also included. 2009 -2012, Project Engineer /Manager, Client /Reference: City of Dania Beach, Dominic F. Orlando, PE. (954) 924- 3740 44 Calvin, Giordano & Associates, Inc. E X C E P T I O N A L S O L U T 1 0 N S Thomas Francis Lubanovic, P.E., S.E., P.S.M. Project Manager PROJECT EXPERIENCE Project Engineer, Calvin, Giordano & Associates, Inc. Senior Project Engineer, HMT & ASSOCIATES (3/2013 to 2014) HMT & Associates is a consulting firm specializing in civil, municipal & structural engineering &surveying services. HMT represents more than 20 municipalities as well as Washington County, PA. As a Manager of Civil Engineering & Senior Project Engineer. Worked with communities and on engineering projects throughout the Southwest Pennsylvania Region. Shown below are some of the day to day projects and activities. Responsible for: • Washington County justice Center Parking Garage Rehabilitation • Greenbriar Treatment Center Addition -Site Plan • Mt. Pleasant Township Building Evaluation • A & S Landscaping Consolidation & Site Development Plan • Donegal Township Paving Plan, Specification & Bid process • Adams Avenue Bridge Demolition & Structural Design • Engineer of Record - Various Highway Occupancy Permit Plans • Surveyor of Record - Various Boundary Surveys • Surveyor of Record - Various ALTA Surveys • Attend monthly municipal meetings Manager, Engineering Services, AWK Consulting Engineers, Inc. (5/2011 to 2/2013) AWK Consulting Engineers is a DBE consulting firm specializing in civil, geotechnical & structural engineering as well as surveying services. As the Manager of Engineering Services, supervised and coordinated all engineering projects for the Pittsburgh, Harrisburg & Orlando, FL offices. Most of the projects are Penn DOT highway work using the ECMS system. Additionally used the ECMS system to prepare proposals as a subcontractor to various prime consulting engineering firms. • Worked Direct(v for the President - Mr. Errol S. Abdulla, P.E. • Opened the Orlando, Florida office for AWK Consulting Engineers, Inc. • Supervised staff of 60+ Engineers, Geologists, Surveyors & CA DD Personnel • Business Development of Gas & Oil industry activities, proposals, etc • Project management & oversigllt of Gas & Oil industj:V projects • Reviewed Administrative Documents i.e. timesheets, btu /gets, etc • Administered Company Policies & Guidelines • Billable Project Related time - 50% (Average) • Preparation of geotechnical, sun ctural & surveying proposals • Engineer of Record- H & H Projects & 2012 Harrisburg Projects • QAIQC of numerous Geotechnical reports Consulting Engineer & Land Surveyor Self Employed - Consulting Engineer (2/2010 to 5/2011) Self employed as a consultant specializing in surveying, civil & structural engineering, and land surveying. Projects a refocused primarily on residential & small commercial surveying & engineering applications. • Self- Employed- Worked within the UC guidelines & regulations B 0 Calvin. Giordano & Associates, Inc. % E S C E P T 1 0 N A L s O L U T 1 0 N s Thomas Francis Lubanovic, P.E., S.E., P.S.M., Page 2 Manager- Civil /Structural Department, JNE Consulting Engineer's (10/2008 to 2/2010) JNE Consulting is a Canadian based engineering firm in industrial projects, civil & structural engineering. As the Manager of the Civil /Structural group, 1 supervised and coordinated the Civil /Structural Department f or heavy industrial projects throughout the United States & Canada. Worked Directly for Edward Price, General Manager- Export Office y Supervised staff of 1 0 -14 Engineers, EIT & CADD Personnel y Reviewed structural reports using STAAD & other computer software y Billable Project Related time- 65% (Average) Management of JNE Document Management System per /SO Standards y Major Projects included: • Arcelor Mittal Indiana Harbor, Indiana- Pulverized Coal Injection Facility Design • TKS Furnace & Galvanizing Line, Alabama- Structural Analysis & Design • Shenango Coke Works, Neville Island, PA - Forensic Structural Design • DTE Tar Sludge Recycling Facility, Detroit, MI- Structural & Foundation Design • QAIQC of all outgoing structural documents, drawings & reports Sr. Project Engineer, Murray Associates, Inc. Associate (6/2007 to 10/2008) Murray Associates, Inc. is an engineering consulting firm specializing in civil & structural engineering, geotechnical design & analysis and land surveying. The projects I supervised were primarily residential & small commercial applications. Worked Directly for the President - Mr. Jack Murray, P.E. and Supervised staff of One EIT & 2 -CADD Personnel y Reviewed time sheets, project budgets, etc. y Billable Project Related time- 85% (Average) y Major Projects included: • ABC Beverage Corporation, Verona, PA - Caisson Design • Arcadia Industrial Company, Indiana, PA - Crane Rail & Foundation Design • Lami Grubb Architects, West Miffin, PA -Site Development • St Barbara's Catholic Church, Collier Township, PA -Site Development Final review of all outgoing structural documents, drawings & reports Sr. Highway & Project Engineer, T.Y. Lin International (9/2006 to 6/2007) T. 1'. Lin International is an engineering consulting business specializing in civil engineering, bridge & roadway design & land development. As a Senior Project Engineer in the Fort Myers office, I supervised, and coordinated local road and stormwater applications. Worked Directly for Mr. James Molnar, P.E., Manager- Fort Myers Branch y Supervised staff of 2 CADD Personnel and Billable Project Related time - 90% (Average). Major Projects included: • City of Fort Myers - SWMM H & H Analysis of Stormwater Canal System • Burnt Store Road - Cape Coral - Highway Design & Stormwater Management • Plantation Road Extension - Lee County- Highway design, estimating & specifications • Gator Circle- Cape Coral - MOT & MUTCD Ern Calvin. Giordano 8 Associates, Inc. �� J-, � E % C E P T I O N A L S O L O T 1 0 6 i Manuel J. Docurro, PE, LEED Green Associate Electrical Engineer SUMMARY OF QUALIFICATIONS Mr. Docurro has been providing electrical engineering services for more than 15 years. He is a senior project manager and electrical engineer at CGA, and his experience includes the quality control and design phase of electrical systems for commercial, industrial, governmental, and recreational facilities. PROJECT EXPERIENCE City of Miami Beach - Mid -Beach Recreational Corridor, Project Electrical Engineer. Provided the electrical design for the new LED bollard lighting system for the proposed walkway. City of Delray Beach - NE 2nd Avenue Improvements, Project Electrical Engineer. Provided electrical design for the new roadway LED lighting system. City of Jupiter - AIA Bike Lanes, Project Electrical Engineer. Provided electrical design for the new roadway LED lighting system. City of Weston - Emerald Estates Park Improvements, Project Electrical Engineer. Provided electrical design for the new LED walkway lighting system. Miami -Dade North Trail Park - Parking Expansion, Athletic Courts and Lighting, Project Manager. Provided electrical design for the recreational sports lighting for the new skate plaza and basketball courts and conventional (HID) lighting for the expanded parking lot. Miami -Dade Gwen Cherry Park- Baseball Fields Lighting, Project Manager. Provided electrical design for the new recreational sports lighting system for the existing baseball fields. Miami -Dade Gwen Cherry Park - Lighted Tennis Courts, Project Manager. Provided electrical design for the new recreational sports lighting system for the new tennis courts. Miami -Dade Tamiami Park - Baseball Field #3 Lighting, Project Manager. Provided electrical design for the new recreational sports lighting system for the existing baseball field #3. Miami -Dade Country Village Park- Skate Court Lighting, Project Manager. Provided electrical design for the new recreational sports lighting system for the existing skate court. Miami -Dade Crandon Tennis Center - Multiple Courts Lighting, Project Manager. Provided electrical design for the new recreational sports lighting system for multiple tennis courts. Miami -Dade Wild Lime Park - LED Parking Lot Lighting, Project Manager. Provided electrical design for the new LED parking lot lighting system for the expanded parking lot. Miami -Dade McMillan Park - Parking Lot Lighting, Project Manager. Provided electrical design for the HID lighting system for the expanded parking lot. Miami -Dade Coral Villas Park - Solar Walkway Lighting, Project Manager. Provided electrical design for new solar - powered walkway bollard lighting system. Calvin, Giordano & Associates, Inc. E A C E P T 1 0 N A L S O L T 1 0 N i Manuel ]. Docurro, P.E., Page 2 Miami -Dade Trail Glades Range Electrical Feed to Trap and Skeet, Miami, Florida. Project consisted of the complete rebuild and upgrade of the electrical feed to the trap and skeet area of subject site. Mr. Docurro was in charge of the scope of work determination and ensuing electrical design required to upgrade the electrical power facilities to fully meet the customer's requirements. Miami -Dade A.D. Barnes Nature Center Trailer, Miami, Florida. Project consisted of utility provisioning (water, sewer, electrical, telecom) for a new double wide trailer. Mr. Docurro was in charge of the electrical design for the provisioning of electrical power to the new trailer. Miami -Dade Colonial Drive Park Concessions Building, Miami, Florida. Project consisted of a new concessions building for the park and provisioning of all required utilities. Mr. Docurro was in charge of the electrical design for the electrical power provisioning and lighting layout. Miami -Dade Amelia Earhart Park Soccer Complex Phase 11, Miami, Florida. Project consisted of two new lighted soccer fields and a new recreation building. Mr. Docurro was in charge of the electrical design for the electrical power provisioning, sports lighting, building interior lighting layout, and lightning protection system. Miami -Dade Oak Grove Park Trailer, Miami, Florida. Project consisted of utility provisioning (water, sewer, electrical) for an existing trailer. Mr. Docurro was in charge of the electrical design for the provisioning of electrical power to the new trailer. Miami -Dade Southridge Park Scoreboard and PA System, Miami, Florida. Project consisted of the installation of a new multi - purpose scoreboard and public address (PA) system for the park. Mr. Docurro was in charge of the electrical design for the power provisioning to the scoreboard as well as the system design and specifications for the PA system. Miami -Dade Zoo Miami Interactive Aviary Exhibit, Miami, Florida. Project consisted of a new exhibit building for the zoo and the provisioning of all required utilities (water, electrical). Mr. Docurro was in charge of the electrical design for the provisioning of electrical power to the new building. Miami -Dade Tropical Park Equestrian Center Agricultural /Industrial Ceiling Fans, Miami, Florida. Project consisted of the provisioning of six industrial large diameter ceiling fans for the existing equestrian center building at subject site. Mr. Docurro was in charge of coordinating the design (structural and electrical disciplines) and performing the electrical design for the provisioning of electrical power and control for the new fans. Additional Project Experience • A.D. Barnes - Walkway Lights, Miami, Florida • Briar Bay Park - Solar Walkway Lighting Upgrade, Miami, Florida • Chapman Field - Ballfields Lighting Upgrade, Miami, Florida • Chittc hatchee Park - LED Walkway Lighting, Miami, Florida • Crandon Park - Driving Range Lighting, Key Biscayne, Florida • Haulover Park - New Pay Stations, Miami, Florida • Joseph Caleb Community Center - Seating and Lighting Upgrades, Miami, Florida • Mangus Special Tax District - Landscape / Sign Lighting, Miami, Florida • McMillan Park - Walkway Lighting, Miami, Florida • Ruben Dario - Shelter, Miami, Florida • Southridge Park - Security Camera System, Miami, Florida • Southridge Park - Pressbox, Miami, Florida • Trail Glades Range - Parking Lot Lighting Upgrade, Miami, Florida • Zoo Miami - Concert Field Upgrades, Miami, Florida • Zoo Miami - Anteater Holding Expansion, Miami, Florida m Calvin, Giordano 8 Associates, Inc. E% C E P T I O N A L 5 0 t U T 1 0 NS Sandra Lee, AICP CEP, LEED AP BC +D Director, Environmental SUMMARY OF QUALIFICATIONS Ms. Lee has 20 years of professional experience and directs CGA's Environmental Department, coordinating regulatory permitting, environmental planning, site assessment, resource management and environmental technical support services. Before joining CGA, Ms. Lee was a biologist with the Growth Management Division of Monroe County. During the three years that CGA provided planning and zoning services for the newly incorporated City of Marathon, she lived full -time in the Florida Keys and was responsible initially for all the environmental planning for the City of Marathon and subsequently for a full range of planning services for the City. Prior to relocating to Fort Lauderdale, Ms. Lee was a resident of the Florida Keys for 10 years where she became very familiar with the environmental sensitivities regarding the Flora, fauna, land and special government programs governing and protecting the 160 -mile string of coral islands making up the Keys, a designated area of critical State concern. In general, Ms. Lee: • Provides technical support, environmental resource management, environmental planning and sustainable development services to public and private entities • Provides permitting services to obtain environmental resources permits at the local, state and federal level • Coordinates inter- agency and multidisciplinary team efforts • Provides most feasible development and mitigation options, and the probable costs for mitigation options • Prepares Coastal and Conservation Elements for Comprehensive plans, coordinates on Comprehensive Plan Evaluation and Appraisal Reports (EAR) and EAR -based amendments • Designs wetland mitigation plans, provides bidding and construction oversight services for the construction and installation of mitigation and natural areas • Manages the compliance monitoring on over 2,000 acres of constructed wetlands and administers the maintenance contract on over 2,000 acres of created and enhanced wetlands • Conducts and manages field staff conducting wetland, wildlife and habitat assessments, imperiled species surveys, mitigation compliance monitoring reporting, and tree surveys Pembroke Harbor, Pembroke Pines. Conducted the quarterly, five year compliance monitoring and reporting program on 31.2 acres of wetland containing emergent marsh, tree islands, and open water with a hydric berm separating the mitigation from an adjacent drainage canal. Miramar Pinelands: Conducted the quarterly, five year compliance monitoring and reporting program on 31.9 acres of wetland creation located on Broward County Park land at the historic head of the Snake Creek slough, contains open water and wet prairie habitat. Phillips Plat, Port Everglades. Conducted the quarterly, five year compliance monitoring and reporting program on 8.6 acres of tidally influenced mangrove habitat recognized as a Local Area of Particular Concern by Broward County. Land Clearing Review, Loxahatchee Groves: On behalf of the Town reviewed and issued the land clearing permit for a 15+ acre religious facility on Pineland habitat, developed the tree mitigation plan, developed the performance guarantee estimate, conducted the site inspections to ensure compliance to the issued permit, and final permit close -out. O O O O O O O O O O O O Calvin, Giordano & Associates, Inc. E X C E P T 1 0 N A L S O L U T I O N 5 Steven M. Watts, PSM Director of Surveying & Mapping SUMMARY OF QUALIFICATIONS Mr. Watts has 26 years of experience as a surveyor and mapper. Having spent his entire surveying career working in Broward County, he is extremely knowledgeable of the rules, requirements and specifications for completing surveying and mapping projects in the South Florida area. He specializes in architectural and engineering design type surveys, land acquisition, easements, title research, and computer mapping. PROJECT EXPERIENCE Director of Survey - Calvin, Giordano, & Associates, Inc., Fort Lauderdale, FL. As Director of Survey he is responsible and involved in all aspects of the company's surveying and mapping projects. General Surveying & Mapping Services - City of Pompano Beach. Boundary & Topographic Surveys: Community Park, Canal Point Park; Legal Descriptions: Avondale Fishing Piers; Topographic Surveys: Pompano Beach Air Park; Taxiway "N" - Pavement Widening, Runway 15- Runway Protection Zone, Magnetic Heading, Runways 6-24,15-33 and 10 -28. General Surveying & Mapping Services - City of North Lauderdale. Boundary and Topographic Surveys, As -Built Surveys, Legal Descriptions, City Limit Determinations and General Surveying Services for the City of North Lauderdale. Additional responsibilities include project surveyor for the topographic survey of the municipal complex, GIS, water control district and utility mapping, Hampton Pines Park and Silver Lakes Middle School ball field renovation. General Surveying & Mapping Services - City of Coral Springs. Boundary and Topographic Surveys, As -Built Surveys, Legal Descriptions, Design Surveys, Construction Stakeout, and General Surveying Services for the City of Coral Springs. General Surveying & Mapping Services- City of Coconut Creek. Boundary, Topographic and Design Survey for Facilities Maintenance Area and Copans Road for the City of Coconut Creek. GIS Base Mapping- Broward County Property Appraiser's Office. Property Appraiser's GIS -Base Mapping Projects. Work completed to date includes City of Pompano Beach, City of Fort Lauderdale, City of Margate, City of Miramar, and City of Dania. Projects involved precise coordinate geometry mapping and conversion to Arc -Info polygon coverage. LIS System - City of Miramar. Project Manager for the Land Information System (LIS) completed for the City of Miramar. This project encompasses approximately 20,000 acres of land within the city limits. Coordinate geometry was used to prepare geometrically precise base maps tied to the Florida State Plane Coordinate System. The work was done in an AutoCAD environment to facilitate future GIS applications. The LIS contains information on rights -of -way, plats, blocks, lots, ownership, tax folio numbers and property appraiser information. GIS System - City of Miramar. Project Manager for the development of a geographic information system (GIS) necessary to implement a special assessment for the new water treatment plant. Tax assessor information was digitally downloaded for over 600 parcels and compiled into an Oracle data base. Data base records were gee - referenced to AutoCAD polygon information and compiled into a GIS application. Calvin. Giordano 6 Associates, Inc. F X i E P T 1 0 N A L S 0 L U T 1 0 K i Steve M. Watts, PSM, Page 2 Base Map - City of Port St. Lucie. Project Manager for the development of a computerized base map of 80 square miles comprising the City of Port St. Lucie. The first phase entailed establishing horizontal control utilizing GPS and setting vertical control benchmarks throughout the city. Detailed topographic information was gathered for all the public roads (800 miles) via electronic data recorders and overlaid on a geometrically precise map of the platted subdivisions. Raster images of aerial photography were scanned thus providing a photographic overlay for the digital map. Relocation and Land Acquisition Assistance Program - Base Mapping- Broward County Aviation Department. Project Manager for the relocation and land acquisition project for the Fort Lauderdale - Hollywood International Airport. Directly involved in all aspects of the project including deed and right -of -way analysis for 12 square miles of property and approximately 2,800 parcels. The data base of utilities, runways, rights -of -way, plats, sectional and ownership information serves as the base map for the GIS system. Property Map - Fort Lauderdale - Hollywood International Airport - Broward County Aviation Department. Project surveyor responsible for the maintenance ofthe Airport Property Map. Responsibilities include the mapping of new parcels, reviewing ownership and easement documentation and working closely with Aviation Department's legal staff on deed interpretation. 51 Calvin, Giordano & Associates, Inc. L x C T P T 1 0 N'' A L i 0 L U T 1 0 F i Gregory J. Clements, PSM Assistant Director of Surveying & Mapping SUMMARY OF QUALIFICATIONS Mr. Clements has 45 years of experience as a surveyor and mapper. He is expert in all phases of land surveying including the retracement of section lines, lot lines, tract lines, right -of -way (ROW) lines, and centerlines. Mr. Clements' responsibilities include preparation of proposals, budget control, quality control (QA /QC), and technical support for the field crews. He also coordinates the preparation of legal descriptions, record plats, ROW maps, boundary surveys, topographical surveys, and acts as the liaison between the client and the firm. PROJECT EXPERIENCE SR 953 /Leleune Road, Miami, Florida. Mapping supervisor for survey design file and Project Network Control Sheet for Leleune Road from US 1 to NW 11th Street, approximately 4 miles. SR 973 /Galloway Road, Miami, Florida. Mapping supervisor for survey design file and Project Network Control Sheet for Galloway Road from SW 40th Street to SW 5th Street, approximately 2 miles. Riviera Isles, Miramar, Florida. Prepared boundary surveys and record plats for four phases of development for 2000 -lot development. City of Tamarac, Florida. Prepared multiple boundary surveys of parcels of land being acquired by the City for a new park and cell tower site. Town of Davie, Florida. Prepared boundary, topographic and tree surveys on proposed 10 -acre water treatment site. Additionally prepared and recorded a plat and wrote multiple sketch and descriptions for utilities for the same site. City of Pahokee, Florida. Prepared sketch and legal description of new Community Redevelopment Area (CRA). Involved research into the old records used to establish the City. Various Substation Surveys, Miami -Dade, Broward, Palm Beach Counties, Florida. Prepared boundary, tree, and topographic surveys on substations ranging in size from two to more than 40 acres. Gulfstream Park, Hallandale Beach, Florida. Prepared plat boundary and topographic surveys of 260 -acre horse track /entertainment complex. Combined aerial mapping techniques with conventional survey methods to produce a high quality drawing under budget. City of Lauderhill GIS Drainage Infrastructure Inventory, Lauderhill, Florida. Responsible for creating data dictionary fields and uploading to Trimble pathfinder. Data downloading and processing of GPS files using Trimble GPS Pathfinder Office and outputting into ESRI shape files and attribute data files. City of Weston, Florida. Since 1997 responsible for multiple route surveys throughout the City. Surveys were used by engineers to design major roadway and utility improvements. Calvin. Giordano & Associates, Inc. E X C E P T I O N A L 5 O L U T 1 0 R 5 Keith Brien Surveyor Technician SUMMARY OF QUALIFICATIONS Mr. Brien has 15 years' experience in surveying Including 7 years as a Engineer for the United States Army ranging from CADD Technician, Rodman, Instrument Man and Party Chief. His experience includes subdivision lot and block surveys, land development construction staking, as -built surveys, boundary and topographical surveys. Proficient in using Leica Scanstation for 3 -D Surveys. His experiences include Client Meetings, and ALTA /ASCM Land Title Surveys, Airport Runway repairs, Military Base camp layouts and installation. His current responsibilities include assisting Field Survey Operations in the daily management of field crews, CADD Drafting, Processing of Field Data and Soft Dig of Utilities in Multiple Municipalities. PROJECT EXPERIENCE The Villages at Harbor Isles, Dania Beach, Florida. Responsible for drafting of Plot Plans, Foundation Surveys, Final Surveys and Various Easement Sketch and Descriptions for client. Client: Carr Residential. Cobblestone, Pembroke Pines, Florida. Responsible for drafting of Plot Plans, Foundation Surveys, Final Surveys and Various Easement Sketch and Descriptions for client. Client: Standard Pacific. Cobblestone Plaza, City of Pembroke Pines, Florida. Responsible for drafting of Plot Plans, Foundation Surveys, Final Surveys and Various Easement Sketch and Descriptions, ALTA Surveys, Specific Purpose Surveys and removal of Buildings from the N.F.I.P. for client. Client: Kite Realty Group. City of Oakland Park, Broward County, Florida. Responsible for the preparation and Field locations of underground utilities using the VaxCavator Machine. Client: City of Oakland Park. Camp Bondsteel and Camp Monteith, Kosovo. Responsible for the operation of survey instrument operator, CADD technician and designer of a 680 acre base camp for NATO forces. Facilities include: Fuel Farm, Sanitation area, Living facilities(SEAHUTS), Aviation Facilities and Security Placements. Client: U.S. Army IRAQ, Operation Iraqi Freedom. Field Chief (Squad Leader) responsible for the survey and installation of multiple airfields from Southern Iraq to Balad Airbase. Performed soil testing and compaction tests. Responsible in the rebuilding of Balad Airbase, offsite roadways and infrastructure in surrounding villages. Warren Henry Infiniti, Davie, Florida. Survey Technician responsible for providing field locations for stakeout of structures and drafting of Boundary, Foundation and Final Surveys for car dealership site. Performed office calculations for building and miscellaneous layout including dry utilities. Client: Stiles Construction. Broward County Mast Arm Locations, Broward County, Florida. Survey Technician responsible for the preparation, Party Chief of field operations and processing of 3 -D survey locations for 20 traffic intersections using the Leica Scanstation. Client: Broward County. Daniel Spector, P.G., LEP Senior Project Manager Hydrogeology, Water Resources, Contamination Assessment/Remediation 22 years in the industry 110 years with Langan Mr. Spector has 22 years of experience in the environmental and wate resources fields. His area of concentration is hydrogeology and he ha' investigating aquifer properties for more than 130 stormwater drainage well projects. His hydrogeology experience includes looking for sources of water for major development projects in Nicaragua and Colombia. He is experienced in the application of county, state, and federal laws and regulations and has worked on state and local government and agency projects. He has contamination assessment and remediation experience, designing and implementing assessments of petroleum and non - petroleum contaminated groundwater and soil. Mr. Spector's experience includes interpreting seismic data and quality control, including calibration of seismic interference and real -time monitoring of data collection, in the Gulf of Mexico and offshore Brazil. Selected Projects Reasonable Assurance Investigations and Specific Capacity Testing for Area -Wide Drainage Improvements — Hallandale Beach and Sunny Isles Beach, FL Engineering Control Plan Design and Conditional Closure, Trademark Metals Recycling — Opa Locka, FL UST System Design /Drainage System Design/Contamination Assessment/ Natural Attenuation Monitoring, Ryder Truck Rental — Davie, FL Pan Am Tract 1 Soakage Pit, Sediment, and Groundwater Investigation — Miami International Airport, Miami, FL Methane Gas Mitigation, Ryder Truck Rental — Miami, FL Construction Dewatering Monitoring, former Saxony Hotel — Miami Beach, FL Due Diligence Assessments, Truck Maintenance Facilities, Ryder System, Inc. — Miami, FL Tenant Environmental Compliance Audits, Miami International Airport — Miami, FL Chlorinated Solvent Assessment and Monitoring, Fontainebleau Hotel — Miami Beach, FL Drill Shaft Permitting for Construction Dewatering, — Miami, FL Northwest Cargo Area and West End Cargo Area Assessment and Feasibility Study — Miami International Airport, Miami, FL Conditional Closure for Arsenic and Dieldrin, Municipal Golf Course — Pompano Beach, FL Mechanical Integrity Test, Air Products & Chemicals — Pace, FL Free Product Recovery, ExxonMobil Natural Gas Processing Facility — Jay, FL Water Resource Investigations and Water Well Design, Installation and Testing — Colombia and Nicaragua rauceuvu B.A., Geology CUNY, Hunter College M.S., Geosciences Florida International University Professional Registration Registered Professional Geologist in FL (No. 1999) and AL (No. 1093) Licensed Environmental Professional (No. 161) 54 0 Calvin, Giordano 8 Associates, Inc. E C C E P r 1 0 N A t s O t u 7 1 0 N 5 SERVICES APPROACH The Calvin, Giordano & Associates, Inc. (CGA) Team has thoroughly reviewed the scope of work outlined in the RFQ document, and we are confident that CGA is the firm who can best provide a service value for the City of Sunny Isles Beach for the identified services. Our engineers, landscape architects, environmental professionals, grant administrators, and other team members will provide a well- thought -out plan and ex- ceptional solution. CGA's offices are located at 1800 Eller Drive in the City of Fort Lauderdale, immediately adjacent to the south entrance to Port Everglades, and less than a 30- minute drive to Sunny Isles Beach. CGA provides Civil Engineering, Land Surveying, Land- scape Architecture, Environmental Resources Protec- tion, Grant Administration, and GIS services, as well as Planning, Platting, Traffic Engineering, Electrical Engineering, Information and Data Technology, Con- struction Management, and Construction Engineer- ing Inspection (CEI) services. CGA's Civil Engineering staff includes 14 licensed Professional Engineers, 5 Engineer Interns, and 3 Cadd Drafting Technicians; our Landscape Architecture staff includes 2 registered Landscape Architects, an Urban Planner, and a Cadd Draftsman /Site Planner; and our Land Surveying staff includes 2 Professional Surveyor and Mappers, 3 sur- vey crews, and 2 Cadd drafting technicians. CGA is committed to dedicating the appropriate personnel and resources to this project to ensure its efficient and successful completion. The timing and scope of this project make it an ideal fit for our organization at this time. SCOPE AND VISION The CGA Team will obtain any available information about the existing utilities via existing GIS data, maps, as- builts, permit research and information that can be provided by the City. CGA will complete an initial evaluation and inventory of the infrastructure and a survey if required to collect any missing information. CGA's Team will research existing records that span decades of development. Collection of data using the latest GPS technology will produce the most accu- rate maps possible for the design modeling. These maps will include all existing utilities, above ground improvements within the R/W and existing drainage improvements. In addition we can convert all informa- tion to an electronic as -built record data base for the development of the GIS / AutoCAD inventory of maps. We will model the existing system with our modeling software, report our findings and comparisons with the current Level of Service, and will then identify and prioritize areas that need improvements. Cost effective alternatives that include Level of Service improvements and environmental applications for wa- ter quality and quantity will be explored and present- ed to the City for consideration and implementation. These may include a collection and transmission sys- tem with surface retention, eco- swales, pumps with a network of deep injection wells, or some combination of these options and other alternatives in the case of a stormwater project. CGA understands the conditions of a municipality sit- uated in the coastal area of Dade County, with surface elevations slightly above sea level and limited options for drainage. Our proposed solution will address po- tential Flooding and non- point- source pollution im- pacts of existing or proposed stormwater manage- ment systems in the case of a stormwater project. RFQ No. 14 -07 -02 1 Continuing Professional Services 55 -' Calvin, Giordano 8 Associates, Inc. E% C E P T 1 0 K A L S 0 L u T 1 o R s CGA has a long track record obtaining grants and iden- tifying other revenue sources to assist the City from concept to completion of the project. Options and op- portunities include grants, loans, stormwater assess- ments, and public /private partnerships. We have as- sisted other municipalities by obtaining grant funding for a variety of utility improvement projects. Throughout all phases of a project, CGA makes a com- mitment to provide the utmost levels of quality con- trol and professionalism in the realization of the cli- ent's vision and plan. Additionally, we take great pride in always seeking mechanisms and means through which projects can be more sustainable on our econ- omies and environment while keeping stakeholders and residents informed. CGA PROCESS The design team at CGA has developed a tiered meth- odology of project design development that applies to this RFQ's scope and has proven as an effective mech- anism to adequately ensure proper development of a project and inclusion of the Client or stakeholders in the process. This process is outlined and described as follows: • Scoping & Planning • Inventory & Data Collection • Analysis and Modeling • Design schematics • Stakeholder input • Design development • Final Model and Report Scoping and Planning - The CGA Team will have a project kick -off meeting with the Client's Project Man- ager to obtain a full understanding of the project pa- rameters, community sensitivities, areas of concern, time constraints, and economic requirements. We will then prepare a project schedule and budget as we ini- tiate inventory and data collection efforts. The sched- ule will be prepared in Microsoft Project or Primavera P6 to facilitate effective project management and exe- cution of the work in the optimum timeframe while al- lowing tracking of task completions and of milestones. Inventory & Data Collection - Throughout the in- ventory phase, all pertinent information affecting the design and impact of project are assembled and com- pared against the City's existing. Throughout this pro- cess topographic information is verified for acceptable level of accuracy with the addition of any new utility features. Utility request letters are sent out, permit re- search is conducted and site visits are made. Coordi- nation with adjacent projects would occur during this initial phase. Soil and water sampling, any required environmental assessments and geotechnical analysis would get started in order to have the required data and reports ready for the analysis phase of the project. Analysis and Modeling- Once all the information has been assembled through the inventory phase, design staff conducts analyses to interpret the data through modeling software and provides scenarios with simu- lations - principally to identify and foresee any poten- tial conflicts and constraints, as well as to shed light on additional opportunities available that will further the success of the project, be it via design or through the logistical process of documentation, permitting or construction. Additional site visits to verify informa- tion as well as pre- application meetings with the agen- cies occur during this phase. Design Schematics - Conceptual design schematics are presented that describe the overall concept of and vision for the project and target areas, program dis- tribution and potential detail and material finishes that will contribute to the finish character of the plan. These conceptual plans are utilized for meetings with relevant City staff in anticipation of community meet- ings. These plans will be utilized to coordinate with adjacent utility owners /operators. Stakeholder Input - It will be essential to engage stakeholders, solicit their input and incorporate that input early on in the design process to obtain buy -in from those individuals most impacted by a project. Design schematics allow for modulation of the design to meet the needs and requests made by stakeholders, while presenting a stage of the process that conveys commitment from the investor. Design Development - Once stakeholder input has been obtained and implemented in the design, the design then enters into a development phase wherein our design team narrows in on the details and specif- ics of the project, pending a final design approval by the Client while meeting the current regulatory re- RFQ No. 14 -07 -02 1 Continuing Professional Services 56 Calvin, Giordano 8 Associates, Inc. E% C E P T 1 0 N A L i O L u T 1 0 N i quirements and providing cost effective alternatives. This phase involves frequent meetings with the City to ensure the project design is progressing as intended. Coordination with the regulatory agencies is complet- ed during this time. Final Model and Report - Once the client approves the final design and permits are obtained, the model will be completed and the final report will be produced to document the findings and our proposed design. GRANT EXPERIENCE CGA also has extensive experience facilitating grants writing and administration services for our many cli- ents. Our systematic approach to applying for grants has proven to be successful, returning a high rate of positive results. Internally, our grants are overseen by our Grants Coordinator, who assesses the needs of each grant to strategize the best method for approach. The Grants Coordinator then relies on directed tech- nical expertise provided by an assigned professional in each of the disciplines, contributing to the overall submittal package. Our success with grants has produced repeated posi- tive results, including: • City of West Park - South Florida Water Man- agement $250,000 for Stormwater • City of West Park - Florida Department of En- vironmental Protection $250,000 for Storm- water • Town of Surfside - Florida Department of En- vironmental Protection $1,347,500 for Storm- water • Town of Surfside - Florida Department of En- vironmental Protection $125,000 for Sanitary Sewer • Town of Surfside - Seawall Replacement Grant $565,000 • Town of Surfside - SRF Funding Rehabilitation Project, $9.2M • City of Weston - Community Budget Issue Re- quest (CBIRS) $1,000,000 for Stormwater • City of Weston - FEMA $1,361,700 for Storm- water • City of Weston - Community Budget Issue Re- quest (CBIRS) $1,000,000 for Stormwater • City of Weston - Congress $492,000 for Storm- water • City of Weston - FDEP $100,000 for Stormwa- ter • Bonaventure Blvd. and I -7S Intersection (Pav- ers, Landscaping, Irrigation & Bridge Painting) $65,000 Grant amount & $140,000 total proj- ect cost. • City of Weston - Broward Beautiful Green - SHADE Grant • City of Weston - Florida Urban & Community Forestry Grant - Inventory & Mapping of City Trees $ 35,000 Grant amount & $70,000 total project costs • I - 75 Interchanges at Indian Trace and Glades Pky. (f.k.a. Arvida Pky.) (Landscaping & Irriga- tion of embankments) • City of Dania Beach- Broward Beautiful FOOT State Thoroughfare Grant (Pavers, Landscap- ing & Irrigation) $100,000 Grant amount & $150,000 total project cost. QUALITY ASSURANCE /QUALITY CONTROL The QC process begins with the CGA Quality Control Handbook. This handbook will be utilized to devel- op the project specific plan. Quality is not a quantity which can be added to a work product through any re- view process. Therefore, CGA's approach makes qual- ity an integral part of the project from conception to construction. The Quality Control process is a major agenda item at the kickoff meeting with the design team. All team meetings will address quality by measuring progress against the client's expectations. The team will meet all product requirements, technical requirements, budget requirements, and schedule requirements or will take immediate corrective action to bring the project back in line with these expectations. This is the reason the frequent team status meetings are required. These progress meetings are supplemented by a peer review process where a design group not assigned to the particular assignment will review the plan doc- uments with a fresh perspective. Any comments re- ceived from this peer review are addressed by the project manager which will assign tasks for corrective actions to be taken. All corrections are then resubmit- ted to the firm's Director of Quality Control and Qual- ity Assurance for final sign off before being released. This quality review is performed as part of our quality assurance program. RFQ No. 14 -07 -02 1 Continuing Professional Services 57 Calvin, Giordano 8 Associates, Inc. E S C E P T 1 0 N A L S O L U T I O N S It has been found that even the best component peer review process, though effective within the particular discipline being reviewed, may miss the big picture and result in a lack of congruence in the overall prod- uct. It is for this reason that CGA has instituted the pol- icy of a multi - disciplined review of the product before it is released to the client. By involving the whole team in the entire project quality process, a sense of owner- ship can develop which keeps team members focused on quality throughout the design process. CGA's philosophy and corresponding process to assure quality in all of our designs and work products inte- grates the following key components: • Initial Quality of Design • Multi discipline Peer Review • Design Decision Documentation • Constructibility Review • Value Engineering • "Community Engineering" • Post- Construction Re- Examination Each of these components is described in detail below: Initial Quality of Design - The first step of the QA/ QC process is to ensure that the plan document is of "high initial quality". In other words, the preliminary plan document is one that has been carefully thought through and comprehensively analyzed by a qualified engineer with expertise specific to the demands of the project. Design tasks are not assigned to engineers that do not have sufficient expertise in the areas required, or that do not have sufficient experience to be able to make competent key decisions early in the design pro- cess. A preliminary design must be able to stand alone on its own merits, and it is an unacceptable practice at CGA to allow engineers to omit "pieces' of the design presuming agency reviewers or others will fill in the gaps. Multi- discipline Peer Review: The next step in the QA /QC process is the performance of a multidisci- pline peer review This phase of review is undertaken by a committee of designers from various disciplines within the firm (or "core team" when teaming with others) so that potential improvements or innovative ideas can be introduced to further improve the initial design. This process is important to ensure that relat- ed design elements from the various disciplines work cohesively so that one discipline's component does not cause problems for another discipline's portion of the design. A perfect example is in the design of a divided roadway with median landscaping in which the roadway engineer, traffic engineer and landscape architect mast make sure that all sight distances and clear zones are maintained for the project. This peer review group therefore may consist of the following: • Roadway Engineers • Civil Engineers • Utilities /Drainage Engineers • Traffic Engineers /Transportation Planners • Land Planners • Surveyors • Urban Designers • Landscape /Streetscape Architects • Electrical Engineers • Environmental Scientists • Construction Management Personnel / CE) • Structural Engineers This peer review is typically conducted in a "work- shop" or "charette" type setting in which participants sit around a large conference table with the plans and have easels and /or white boards available to sketch out concepts or revisions. The participants trouble- shoot for fatal flaws, provide critiques, and generally toss around, and often debate ideas and possible inno- vations to the plans. Design- Decision Documentation - Although docu- mentation is an important part of all projects, it is crit- ically important to fully document the assumptions, reasoning, calculations, etc. leading up to any key de- sign decisions made on a project, particularly if safety issues are involved. The process of documentation not only provides good records, but it provides another opportunity for the decision makers to examine the logic of the decisions made, as things often become more apparent when a written record of the process is made. This inherently leads to better decision - making, RFQ No. 14 -07 -02 1 Continuing Professional Services 58 Calvin, Giordano 8 Associates, Inc. E% C E F T 1 0 N A t 5 0 t U T 1 0 N 5 and in turn, better projects. Most people can remem- ber making a decision, but how and why they made that decision, or who else was in agreement, may not be so easily remembered months later. Documenting decisions also establishes a record of the "coalition of concurrence" that existed at the time the decision was made, but which may become more difficult to recre- ate as time passes. It is also important to document the assumptions and environment at the time the decision was made because these things can also change after time. Constructability Review - The " constructability" of a design is an important facet to consider during each phase of a design's development, however, when a preliminary design is nearing substantial completion (90% plans), it undergoes an in -house constructabil- ity review by our CEI and Construction Management departments. This review specifically ensures that the plans make sense from a construction perspective, and is intended to minimize potential problems in the field during construction. Many of the items targeted for this review include, but are not limited to: • Grading & elevations • Drainage • Materials and testing • Standard details and specifications • Potential utilities conflicts • Coordination with adjacent construction proj- ects • Conflicting agency permitting requirements • Logic of construction timing and phasing • Maintenance of traffic / work zone safety • Adverse impacts to community during con- struction Value Engineering - Value engineering is one of those industry buzzwords that is sometimes overused or misinterpreted. All projects should inherently be val- ue- engineered. An integral part of the design process is to produce a cost- effective project for the owner or client. This being said, most agencies view "value engineer- ing" as a separate step in the design process in which engineers are asked to "step out of the box" and ex- amine whether there may be creative ways to provide an equal or better design for less initial cost, or less overall cost during the lifetime of the project. This cost - saving process is often automatically performed in the private sector simply because of the demands of the client and private financing, but public sector proj- ects are traditionally subjected to much thicker layers of standardization which have had the unintended effect of creating less innovative, more "vanilla" proj- ects. Designers are sometimes afraid to stray from the standard designs due to liability or other reasons, and therefore tend to stick with more standard, possibly over - designed projects that were ultimately more ex- pensive. CGA believes that a true value engineering effort must include objective input from external reviewers that are not necessarily familiar with the project. No mat- ter how astute, the in -house designers involved in a project are typically disadvantaged for being able to discern an innovative cost - saving solution or alter- native. We therefore utilize professionals from other consulting firms that we have a good working rela- tionship to participate in projects in which we invoke this external value engineering process. "Community Engineering" - The term "community engineering ", or perhaps the more accurate "political engineering ", is a term we often reserve for municipal projects to remind us that no matter how great we think our ultimate design may be, it has to pass the less tangible test of being accepted by the public and community leaders. This means that the design must be consistent and compatible with the adjacent surroundings and fit in with the objectives of the neighborhood and prevailing political environment. On a more national scale, the Federal Highway Administration and other professional engineering organizations have adopted the term "Context Sensitive Design;' and have established guidelines for federally funded projects in order ensure large projects are compatible with the local character of the community. Therefore, "community engineering' or "context sen- sitivity" must be part of the first step of the design pro- cess, and continue through to final plans preparation. Even in very small local improvement projects, this concept is very important. just imagine presenting a final intersection design that consisted of standard steel -gray galvanized traffic signal mast - arms, con- RFQ No. 14 -07 -02 1 Continuing Professional services 59 Calvin, Giordano & Associates, Inc. r A.c..{z, E C C E P i 1 O R A E S O E U i 1 O S crete separators and concrete light poles at the end of a corridor that was just designed by others with new landscaping, brick -paver islands and antique verde green street lamps as part of another enhancement project. Post - Construction Re- Examination - This post - construction evaluation process is a process that CGA undertakes at the end of certain projects in order to learn more about what could have been done to produce an even better design. Much of the time, we examine contractor's requests for information or unanticipated change orders that occurred during construction. Sometimes we find that items that may have seemed clear to the engineer or designer were not clear or were misinterpreted in the field by the contractor. Sometimes contractors try to find ways to invoke change orders, but other times, there are legitimate issues with the plans provided. As an example, we often find that the provision of additional details, special details or more specific of notes would have alleviated many of these issues, and therefore we try to include these items in future plans. ABILITY TO MEET DESIRED TIME -LINES AND DEADLINES The CGA Team constantly strives to deliver a high quality product to our client at or before the scheduled deadline. CGA will enlist all needed team members to ensure deliverables are provided to the City in an ex- pedited fashion. CGA accomplishes this task by keep- ing all channels of communication open amongst team members and coordinating in -house project meet- ings to make sure project milestones are being met as planned. Communication amongst our large group of experts will allow CGA to expedite project schedules. The CGA Team can assist the City with ensuring the City of Sunny Isles Beach residents and businesses are given a high quality product in the most cost effective manner. Throughout construction, it's crucial to main- tain open communication between the contractor and design team to minimize the number of submitted change orders. This process allows all parties involved to remain on schedule and meet the budget goals. This project's prime focus is obtaining a permanent, cost effective and regulatory compliant solution to a specific issue and will require clearly defined project objectives and a detailed and concise scope definition from project inception. RFQ No. 14 -07 -02 1 Continuing Professional Services 60 • O Calvin, Giordano 8 Associates, Inc. E L C E P T 1 0 N A L S 0 L u T 1 0 N S See following pages for reference letters. RFQ No. 14 -07 -02 1 Continuing Professional Services 61 Calvin, Giordano & Associates, Inc. E X C E P T I O N A L S O L U T I O N S G�Q�IINSPIRE�� V t tF /y O • r 1 r � 5399 N. Dixie nigh.vay, Suite 3 • Oakland Park, Florida 33334 • eww.oakbndparkR.org July 24, 2014 RE: letter of Recommendation for Calvin, Giordano & Associates, Inc. To Whom It May Concern: I am pleased to have the opportunity to provide a letter of recommendation for Calvin, Giordano and Associates, Inc. CGA has provided Landscape Architecture, Engineering and Environmental Services for the City of Oakland Park on various projects. It has been our experience that CGA has competent, available staff with the necessary skills and experience capable of handling challenging and demanding projects with thoroughness while being conscious of the exigencies of grants and public sector projects. They are very responsive to the needs of the City and quality of their work and presentation skills on the projects that they have worked on is outstanding. I would recommend Calvin, Giordano & Associates with complete confidence to provide you with the services required in your next project. Sincerely, CITY OF OAKLAND PARK r 1' Yy Harvey Rambarath, PMP, AICP, LEED GA Assistant Director Engineering & Community Development RFQ No. 14 -07 -02 1 Continuing Professional Services 62 Calvin, Giordano & Associates, Inc. E A C E P T 1 0 N A t 5 0 1 U T 1 0% S Daniel J. Sterrner Myw July 15, 2014 Angel M. Gomez RE: Letter of Recommendation — Calvin, Giordano & Associates, Inc. Commiui°ner Toby Feuer To Whom It May Concern: Cammw ioner Jim Norton The City of Weston has contracted with Calvin, Giordano & Associates, Inc. Commwioner (CGA) for professional consulting services since 1996- Since being employed Thomas M. Kallman by the City in 1997, 1 have continued to be impressed by the firms' cwnmluinner professionalism and depth of experience that their staff brings to our varied John R. Flint needs. The staff at CGA has provided exceptional services for the City of Orr AGroag °'CEO Weston in the disciplines of traffic, civil and electrical engineering, planning, landscape architecture and surveying. In my experiences with CGA, they have taken full responsibility for all aspects of projects from start to finish. Deadlines are met and the quality of the work has consistently been exceptional. The firm has set themselves apart from others through their quality of customer service, performance, diligence and punctuality. I can slate without hesitation that they have gone above and beyond the current industry standards and I would recommend Calvin, Giordano & Associates, Inc. to provide you with these services. Sincerely, Denise Barrett Director of Communications The Nation 3 premier Municipal Corporulioni° 17200 Rocal Palm Bmdevard O Weston. Florida 33316 O Phone: 954 -385 -2000 O Fax 954 -385 -1010 O ,,�.: esmntl.o n RFQ No. 14 -07 -02 1 Continuing Professional Services 63 Calvin, Giordano 8 Associates, Inc. E% C E P T 1 0 N A L 5 0 L u T 1 0 %15 IM11W 1 " \`Z\ TOWN OF SURFSIDE 9293 HARDING AVENUE SURFSIDE. FLORIDA 33154 (305) 861 -4863 • FAX: (305) 861 -1302 W W W.TOWNOFSURFSIOEFL.GOV Chris Giordano Director of Management Services Calvin, Giordano & Associates, Inc. 1800 Eller Dr Suite 600 Ft Lauderdale, FL 33316 Re: CGA Performance /Recommendation Dear Mr. Giordano, Please accept this letter as a recommendation of Calvin, Giordano's services on behalf of the Town of Surfside. Your attention to our needs over the past several years has been exemplary, and we continue to value our relationship with your firm. Services offered by CGA have included: • Engineering- Marine, Civil, Traffic & Electrical • Construction Administration • Surveying • Planning and Zoning • Engineering Plan Review • Environmental Permitting • Grant Consulting & Administration • IT Desktop & Server Management & Services • Miscellaneous Consulting Services The services offered by you and your staff have exceeded our expectations. It has been a pleasure working with the CGA staff and management. Interruption to our normal activities has been kept to a minimum. Please consider this letter as the Town of Surfside's reference for any potential clients. Best regards,, / eohn DiCenso Acting Public Works Director RFQ No. 14 -07 -02 1 Continuing Professional Services 64 • • • • • Calvin. Giordano & Associates, Inc. E% C E P T 1 0 N A t 5 0 E u T 1 0 N 5 See following pages for all required forms. - ` RFQ No. 14 -07 -02 1 Continuing Professional Services 65 ® v f p�/ Of SUN ® DELIVER TO. REQUEST FOR O City of Sunny Isles Beach QUALIFIC,4710NS OPENING: 2:30 PM City Clerk SECTION 5 08/12/2014 ® 18070 Collins Avenue BID SUBMITTAL FORMS ® Sunny Isles Beach, FL 33160 ® Issued by: Purchasing Agent Date Issued: This Bid Submittal Consists of ® AndrewRozwadowski 07/17/2014 Pages 16 through 19 0 ® Sealed bids are subject to the Terms and Conditions of this Request for Qualifications and the accompanying Bid Submittal. Such other contract provisions, specifications, drawings or other data as are attached or ® incorporated by reference in the Bid Submittal, will be received at the office of the City Clerk at the address shown above until the above stated time and date, and at that time, publicly opened for furnishing the supplies or services described in the accompanying Bid Submittal Requirement. ® RFQ 14 -07 -02 Continuing Professional Architectural & Engineering Services Firms Only (CCNA) ® Procurement Acent. Firm Name: Calvin, Giordano & Associates, Inc. ® Andrew Rozwadowski ® Commodity Code(s). ® RETURN ONE (1) ORIGINAL, ONE COPYAND ONE ELECTRONIC PDF COPY ON CD OR DVD OF BID SUBMITTAL PAGES AND AFFIDAVITS ® FAILURE TO SIGN PAGE 16 THROUGH 19 OF THE BID SUBMITTAL WILL RENDER YOUR BID ® NON - RESPONSIVE City of Sunny Isles Beach I Request for Proposal No. 14 -07 -02 ® 66 e LIST BELOW ARE THE DATES OF ISSUE FOR EACH ADDENDUM RECEIVED IN CONNECTION ® WITH THIS BID ® Addendum #1, Dated el /-Dc) Iy e Addendum #2, Dated e Addendum #3, Dated e e Addendum #4, Dated e Addendum #5, Dated e Addendum #6, Dated ® Addendum #7, Dated e Addendum #8, Dated e e PART II: ® F-1 NO ADDENDUM WAS RECEIVED IN CONNECTION WITH THIS BID e e ® FIRM NAME: Calvin Giordano & Associates Inc. ® AUTHORIZED SIGNATURE: Denni . Gior no DATE: /7� OW ® TITLE OF OFFICER: President City of Sunny Isles Beach I Request for Proposal No. 14 -07 -02 °a 0 OF SUN e e ® SECTION 6 e BID SUBMITTAL FOR: e e ACKNOWLEDGEMENT OF ADDENDA e e ® INSTRUCTIONS: COMPLETE PART I OR PART 11, WHICHEVER APPLIES e ® PART 1: e LIST BELOW ARE THE DATES OF ISSUE FOR EACH ADDENDUM RECEIVED IN CONNECTION ® WITH THIS BID ® Addendum #1, Dated el /-Dc) Iy e Addendum #2, Dated e Addendum #3, Dated e e Addendum #4, Dated e Addendum #5, Dated e Addendum #6, Dated ® Addendum #7, Dated e Addendum #8, Dated e e PART II: ® F-1 NO ADDENDUM WAS RECEIVED IN CONNECTION WITH THIS BID e e ® FIRM NAME: Calvin Giordano & Associates Inc. ® AUTHORIZED SIGNATURE: Denni . Gior no DATE: /7� OW ® TITLE OF OFFICER: President City of Sunny Isles Beach I Request for Proposal No. 14 -07 -02 e • e e e 0 e e e e 0 e e e e e e e e e e e e O e '4 Of SO 0" BID SUBMITTAL FORM Bid Title: Continuing Professional Architectural & Engineering Services Firms Only (CCNA) The undersigned Proposers proposes and agrees, if this Bid is accepted, to enter into an agreement with the City of Sunny Isles Beach to perform and furnish all Work as specified or indicated in the Contract Documents and in accordance with the other terms and conditions of the Contract Documents. The Proposers accepts all of the terms and conditions of this or Request for Qualifications. This Bid will remain subject to acceptance for 90 days after the day of Bid opening. The Proposers agrees to sign and submit the Agreement with the other documents required by the Bidding Requirements within ten days after the date of the City's Notice of Award. In submitting this Bid, the Proposer represents, as more fully set forth in the Agreement, that: The Proposer has familiarized himself /herself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Law and Regulations that in any manner may affect cost, progress, performance, or furnishing of the Work. • The Proposer has given the City written notice of all conflicts, errors, discrepancies that it has discovered in the Contract Documents and the written resolution thereof by City is acceptable to the Proposer. This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation; the Proposer has not directly or indirectly induced or solicited any other Proposers to submit a false or sham Bid; the Proposer has not solicited or induced any person, firm or corporation to refrain from Bidding; and Proposer has not sought by collusion to obtain for itself any advantage over any other Proposers or over the City. The City and the successful Proposer will establish completion times for each individual Work Item and the successful Proposer agrees that the work will be completed within the time frames agreed upon and stipulated in the individual Purchase Orders and /or Notice to Proceed. Firm Name: Calvin, Giordano & Associates, Inc. Street Address: 1800 Eller Drive, Suite 600, Fort Lauderdale, Florida 33316 Mailing Address (if different): Same as above City of Sunny Isles Beach I Request for Proposal No. 14 -07 -02 68 ® I,� O C „F Of SUN • O • Telephone No. (954) 921-7781 Fax No. (954) 921 -8807 • 0 Email Address: dgiordano @cgasolutions.com FEIN No. 6/1__0/ 0/1/ 3/8/6/ 9 0 • * "By signing this document the bidder agrees to all Terms 0 • Signature: e ® (Signature of authorized agent) ® Print Name: Dennis J. Giordano s ® Title: President ® THE EXECUTION OF THIS FORM CONSTITUTES THE UNEQUIVOCAL OFFER OF PROPOSER TO 0 BE BOUND BY THE TERMS OF ITS PROPOSAL. FAILURE TO SIGN THIS SOLICITATION WHERE INDICATED ABOVE BY AN AUTHORIZED REPRESENTATIVE SHALL RENDER THE PROPOSAL ® NON - RESPONSIVE. THE CITY MAY, HOWEVER, IN ITS SOLE DISCRETION, ACCEPT ANY ® PROPOSAL THAT INCLUDES AN EXECUTED DOCUMENT WHICH UNEQUIVOCALLY BINDS THE PROPOSER TO THE TERMS OF ITS OFFER. 0 0 O City of Sunny Isles Beach I Request for Proposal No. 14 -07 -02 0 0 0 • • • • • e • e V 0 � no• o�• STATE OF FLORIDA COUNTY OF Florida ) NON - COLLUSION AFFIDAVIT City of Sunny Isles Beach 19070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947 -0606 Fax: (305) 949 -3113 The undersigned being first duly sworn as provided by law, deposes, and says: This Affidavit is made with the knowledge and intent that it is to be filed with the City of Sunny Isles Beach City Commission and that it will be relied upon by said County, in any consideration which may give to and any action it may take with respect to this Bid. The undersigned is authorized to make this Affidavit on behalf of, Calvin, Giordano & Associates, Inc. (Name of Corporation, Partnership, Individual, etc.) a, Corporation formed under the laws of Florida (Type of Business) (State) of which he is President (Sole Owner, Partner, President, etc.) Neither the undersigned nor any person, firm, or corporation named in above Paragraph 10.2, nor anyone else to the knowledge of the undersigned, have themselves solicited or employed anyone else to solicit favorable action for this Bid by the City, also that no head of any department or employee therein, or any officer of the City of Sunny Isles Beach, Florida is directly interested therein. This Bid is genuine and not collusive or a sham; the person, firm or corporation named above in Paragraph 10.2 has not colluded, conspired, connived or agreed directly or indirectly with any proposers or person, firm or corporation, to put in a sham Bid, or that such person, firm or corporation, shall refrain from Bidding, and has not in any manner, directly or indirectly, sought by agreement or collusion, or communication or conference with any person, firm or corporation, to fix the prices of said Bid or Bids of any other proposers; and all statements contained in the Bid or Bids desuibed above true; and further; neither the undersigned, nor the person, firm or corporation named above in Paragraph 10.2, has directly or indirectly submitted said Bid or the contents thereof, or divulged information or data relative thereto, to any association or to any member or agent thereof. Dennis J. Giordano AFFIANT'S NAME Pre ent AFFIANT'S TITLE TAKEN, SWORN AND SUBSCRIBED TO BEFORE ME this ZZ day of l.a , 2WJLk Personally Known Type of identification (Affix seal here) or Produced Identification �o�,," "�e'•• DAWN HOPKINS ' h _ Notary Public - State of jFlofiddla My Comm. Expires Feb 1a.Commission 0 EE 84 DECEMBER 20, 2010 to rn rig NOTARY PUBLIC � (name printed or typed) 1 of 7 ® SuNN1 IS(F , PUBLIC ENTITY CRIMES City of Sunny Isles Beach 18070 Collins Avenue ® �r' • r N", Sunny Isles Beach, FL 33160 Telephone. (305) 947 -0606 Fax. (305) 949 -3113 ® SWORN STATEMENT PURSUANT TO SECTION 287.133(3)(a) FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES ® PUBLIC ENTITY CRIMES ® Pursuant to the provisions of paragraph (2) (a) of Section 287.133, Florida State Statutes - "A person or affiliate ® who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a ® Bid on a Contract to provide any goods or services to a public entity, may not submit a Bid on a Contract with a public entity for the construction or repair of a public building or public Work, may not submit Bids on leases of ® real property to a public entity, may not be awarded to perform Work as a Contractor, supplier, Sub - Contractor, or ® Consultant under a Contract with any public entity, and may not transact business with any public entity in excess of the threshold amount Category Two of Sec. 287.017, FS for thirty six months from the date of being placed on ® the convicted vendor list". ® THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY PUBLIC OR OTHER ® OFFICIAL AUTHORIZED TO ADMINISTER OATHS. O 0 0 O 11.1. This sworn statement is submitted to City of Sunny Isles Beach by Dennis J. Giordano pan mai"duai s name ano twei for Calvin Giordano &Associates Inc. pnn name o en y w mg swam s a emen whose business address is: 1800 Eller Drive, Suite 600, Fort Lauderdale, Florida 33316 and (if applicable) its Federal Employer Identification number (FEIN) is 65- 0013869 (If the entity had no FEIN, include the Social Security Number of the individual signing this sworn statement: ) 11.2. 1 understand that a "public entity crime" as defined in Paragraph 287.133(1)(g), Florida Statutes, means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or with the United States, including, but not limited to, any Bid or Contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state of the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy, or material misrepresentation. 11.3. 1 understand that "convicted" or "conviction" as defined in Para. 287.133(1)(b), Florida Statutes, means a finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trail court of record relating to charges brought by indictment or information after July 1, 1989, as a result of a jury verdict, non -jury trial, or entry of a plea of guilty or nolo contendere. 11.4. 1 understand that an "affiliate" as defined in Para. 287.133(1)(a), Florida Statutes, means: a.) predecessor or successor of a person convicted of a public entity crime, or b.) Any entity under the control of any natural person who is active in the management of the entity and who has been convicted of a public entity crime. The term "affiliate" includes those officers, directors, executors, partners, shareholders, employees, members, and agents who are active in the management of an affiliate. The ownership by one person of shares constituting a controlling interest in another person, or a pooling of equipment or income among persons when not for fair OECEa R28, 2010 WIN 71 • • • • • e e e e e • e • e • • • e • e e e e • 0 e e • e • • • • e e e • • market value under an arm's length agreement, shall be a prime facie case that one person controls another person. A person who knowingly enters into a joint venture with a person who has been convicted of a public entity crime in Florida during the preceding 36 months shall be considered an affiliate. 11.5. 1 understand that a "person" as defined in Para. 287.133(1)(e), Florida Statutes, means any natural person or entity organized under the laws of any state or of the United States with the legal power to enter into a binding Contract and which Bids or applies to Bid on Contracts for the provision of goods or services let by a public entity, or which otherwise transacts or applies to transact business with a public entity. The term "persons" includes those officers, directors, executives, partners, shareholders, employees, members, and agents who are active in management of any entity. 11.6. Based on information and belief, the statement which I have marked below is true in relation to the entity submitting this sworn statement. (Indicate which statement applies.) X Neither the entity submitting this sworn statement, nor any of it's officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, nor any affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. The entity submitting this sworn statement, or one or more of its officers, directors, executives, partners, shareholders, employees, members, or agents who are active in the management of the entity, or an affiliate of the entity has been charged with and convicted of a public entity crime subsequent to July 1, 1989. However, there has been a subsequent proceeding before a Hearing Officer of the State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer of the State of Florida, Division of Administrative Hearings and the Final Order entered by the Hearing Officer determined that it was not in the public interest to place the entity submitting this sworn statement on the convicted vendor list. (Attach a copy of the final order.) I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 11.1 (ONE) ABOVE IS FOR THAT PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED. I ALSO UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD AMOUNT PROVIDED IN SECTION 287.017, FLORIDA STATUTES, FOR CATEGORY TWO OF ANY, CHANGE IN THE INFORMATION CONTAINED IN THIS FORM. By: (Signatur Dennis J. lordano (Printed Name) President (Title) 7 \ I Sworn to and subscribed before me this Z.Z day of k--1A \d 20 by (AFFIX NOTARY STAMP HERE) DAWN HOPKINS Signature: Notary Public —State of Florida = Notary Public - State of Florida j.5 My Comm. Expires Feb 18, 2017 Commission I EE 847097 Print or Type Commissioned Name Person y -KrTbv7h UR FrdZJui!Wr Identification Type of Identification Produced iarsae 3 of S °NNY ,, F n, 0 EQUAL OPPORTUNITY / AFFIRMATIVE ACTION City of Sunny Isles Beach 16070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947 -0606 Fax: (305) 949 -3113 EQUAL OPPORTUNITY /AFFIRMATIVE ACTION STATEMENT The contractors and all subcontractors hereby agree to a commitment to the principles and practices of equal opportunity in employment and to comply with the letter and spirit of federal, state, and local laws and regulations prohibiting discrimination based on race, color, religion, national region, sex, age, handicap, marital status, and political affiliation or belief. Signed: Title: President Firm: Calvin, Giordano & Associates, Inc. Address: 1800 Eller Drive, Suite 600 Fort Lauderdale, Florida 33316 OECE.aE 29, 2010 4 of 7 e e e • • e e e e e 0 e e e e e • • • e e e e e e e e e e e e e e e e e yVNM♦ rarf -o'<� CONFLICT OF INTEREST `Y • City of Sunny Isles Beach 18070 Collins Avenue • r r o� +oo +` Sunny Isles Beach. FL 33160 ox:' ' m •oR '� Telephone: (305) 947 -0606 Fax (305) 949 -3113 CONFLICT OF INTEREST STATEMENT The award of any contract hereunder is subject to the provisions of Chapter 112, Florida State Statutes. Proposers must disclose with their Bids, the name of any officer, director, partner, associate or agent who is also an officer or employee of the City of Sunny Isles Beach or its agencies. STATE OF FLORIDA COUNTY OF Broward BEFORE ME, the undersigned authority, personally appeared Dennis J. Giordano , who was duly sworn, deposes, and states: 18.1. 1 am the President of Calvin, Giordano & Associates with a local office in Fort Lauderdale and principal office in Fort Lauderdale 18.2. The above named entity is submitting a Bid for the City of Sunny Isles Beach, Bid No. RFQ 14 -07 -02 described as: Landscape Maintenance Services. The Affiant has made diligent inquiry and provides the information contained in this Affidavit based upon his own knowledge. 18.3 The Affiant states that only one submittal for the above Bid is being submitted and that the above named entity has no financial interest in other entities submitting Bids for the same project. 18.4 Neither the Affiant nor the above named entity has directly or indirectly entered into any agreement, participated in any collusion, or otherwise taken any action in restraints of free competitive pricing in connection with the entity's submittal for the above Bid. This statement restricts the discussion of pricing data until the completion of negotiations if necessary and execution of the Contract for this project. 18.5 Neither the entity nor its affiliates, nor any one associated with them, is presently suspended or otherwise ineligible from participation in contract letting by any local, State, or Federal Agency. 18.6 Neither the entity, nor its affiliates, nor any one associated with them have any potential conflict of interest due to any other clients, contracts, or property interests for this project. 18.71 certify that no member of the entity's ownership or management is presently applying for any employee position or actively seeking an elected position with the City of Sunny Isles Beach. 18.81 certify that no member of the entity's ownership or management, or staff has a vested interest in any aspect of the City of Sunny Isles Beach. 18.9 In the event that a conflict of interest is identified in the provision of services, I, on behalf of the above named entity, will immediately notify the City of Sunny Isles Beach`. I �} Dated this � dp9 of t �I 201 J. ArrIAN I t-rim or I ype name anc I me Sworn to and subscribed before me this day of !t� , 201 -zmr-_ Personally Known OR O Produced Identification ; Type of I Ification NOTARY PUBLIC STATE OF FLORIDA ",."...e, , DAWN HOPKINS _ Notary Public - Slate of Florida My comm. Expires Feb 18. 2017 Commission a EE 847097 DECEMBER 22, 2010 5 of 7 DISPUTE DISCLOSURE FORM Answer the following questions by placing a "X" after "Yes" or "No ". If you answer "Yes ", please explain in the space provided, or on a separate sheet attached to this form. 19.1. Has your firm or any of its officers, received a reprimand of any nature or been suspended by the Department of Professional Regulations or any other regulatory agency or professional associations within the last five (5) years? YES NO X 19.2. Has your firm, or any member of your firm, been declared in default, terminated or removed from a contract or job related to the services your firm provides in the regular course of business within the last five (5) years? YES NO X 19.3. Has your firm had against it or filed any requests for equitable adjustment, contract claims, Bid protests, or litigation in the past five (5) years that is related to the services your firm provides in the regular course of business? YES X NO If yes, state the nature of the request for equitable adjustment, contract claim, litigation, or protest, and state a brief description of the case, the outcome or status of the suit and the monetary amounts of extended contract time involved. See Section 1 for Litigation Statement I hereby certify that all statements made are true and agree and understand that any misstatement or misrepresentation of falsification of facts shall be cause for forfeiture of rights for further consideration of this Bid for the City of Sunny Isles Beach. Calvin, Giordano & Associates, Inc. Firm Authorized Signature o-) W A Date Dennis J. Giordano / President Print or Type Name and Title pweveea 28, 2010 6 of 7 1 DISPUTE DISCLOSURE V mil` City of Sunny Isles Beach 18070 Collins Avenue ''. • rLo• +oc +` Sunny Isles Beach, FL 33160 ���' Telephone: (305) 947 -0606 Fax: (305) 949 -3113 DISPUTE DISCLOSURE FORM Answer the following questions by placing a "X" after "Yes" or "No ". If you answer "Yes ", please explain in the space provided, or on a separate sheet attached to this form. 19.1. Has your firm or any of its officers, received a reprimand of any nature or been suspended by the Department of Professional Regulations or any other regulatory agency or professional associations within the last five (5) years? YES NO X 19.2. Has your firm, or any member of your firm, been declared in default, terminated or removed from a contract or job related to the services your firm provides in the regular course of business within the last five (5) years? YES NO X 19.3. Has your firm had against it or filed any requests for equitable adjustment, contract claims, Bid protests, or litigation in the past five (5) years that is related to the services your firm provides in the regular course of business? YES X NO If yes, state the nature of the request for equitable adjustment, contract claim, litigation, or protest, and state a brief description of the case, the outcome or status of the suit and the monetary amounts of extended contract time involved. See Section 1 for Litigation Statement I hereby certify that all statements made are true and agree and understand that any misstatement or misrepresentation of falsification of facts shall be cause for forfeiture of rights for further consideration of this Bid for the City of Sunny Isles Beach. Calvin, Giordano & Associates, Inc. Firm Authorized Signature o-) W A Date Dennis J. Giordano / President Print or Type Name and Title pweveea 28, 2010 6 of 7 pt x%'4+1 f f O� fV�• STATE OF FLORIDA ) COUNTY OF Broward ) ANTI- KICKBACK City of Sunny Isles Beach 16070 Collins Avenue Sunny Isles Beach, FL 33160 Telephone: (305) 947 -0606 Fax: f305) 949 -3113 ANTI - KICKBACK AFFIDAVIT I, the undersigned, hereby duly sworn and deposed say that no portion of this sum herein Bid will be paid to any employees of the City of Sunny Isles Beach or its elected officials as a commission, kickback, reward or gift, directly or indirectly by me or any member of my firm or by an officer of the corporation. The foregoing instrument 2C fit- by �rso❑ . as <,lA Q executed]. AFFIX NOTARY STAMP HERE: °4,e'.. DAWN HOPKINS •'� `• Notary Public State of Florida �P• My Comm. Expires Feb 18. 2017 Commission a EE 84709] By: Dennis J.Giordano Title: President acknowledged before me this day of P Yy115 &C)r� VAn [name [type of authority], for [name of party on behalf of whom instrument was Notary Public — State of Florida Print or Type Commissioned Name Personally Known OR Produced Identification Type of Identification Produced DECEMBER 28, 2010 7 of 7