Loading...
HomeMy WebLinkAboutReso 2024-3636RESOLUTION NO. 2024 - A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, APPROVING AN AGREEMENT WITH ADVANCED ROOFING, INC. TO PROVIDE CITYWIDE EMERGENCY ROOF INSPECTION, MAINTENANCE, AND REPAIR SERVICES ON AN AS -NEEDED BASIS, IN AN AMOUNT NOT TO EXCEED THREE HUNDRED THIRTY-ONE THOUSAND NINE HUNDRED SEVENTY-EIGHT DOLLARS AND SEVENTY FIVE CENTS ($331,978.75), ATTACHED HERETO AS EXHIBIT "A"; AUTHORIZING THE MAYOR TO EXECUTE SAID AGREEMENT; AUTHORIZING THE CITY MANAGER TO DO ALL THINGS NECESSARY TO EFFECTUATE THIS RESOLUTION; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the City of Sunny Isles Beach ("City") is in need of a contractor to provide citywide emergency roof inspection, maintenance, and repair services ("Services"); and WHEREAS, the City of Sunrise ("Sunrise") issued Invitation to Bid No. 19 -17 -12 -HR ("ITB") for Roof Maintenance and Repairs, and awarded an Agreement to Advanced Roofing, Inc. ("Contractor"); and WHEREAS, pursuant to section 62-12(C) of the City's Code of Ordinances, purchases made under state general service administration contracts, federal, county or other governmental contracts or competitive bids with other governmental agencies are exempt from the City's competitive bidding procedures; and WHEREAS, the Contractor has expressed its ability and desire to provide the Services under the same terms, conditions, and pricing provided in the Sunrise ITB; and WHEREAS, the City Commission wishes to approve an Agreement with the Contractor to provide the Services on an as -needed basis, in an amount not to exceed Three Hundred Thirty -One Thousand Nine Hundred Seventy -Eight Dollars and Seventy Five Cents ($331,978.75), attached hereto as Exhibit "A". NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, AS FOLLOWS: Section 1. Approval of Agreement. The City Commission hereby approves the Agreement with the Contractor to provide the Services on an as -needed basis, in an amount not to exceed Three Hundred Thirty -One Thousand Nine Hundred Seventy -Eight Dollars and Seventy Five Cents ($331,978.75), in substantially the same form as Exhibit "A". Section 2. Authorization of Mayor. The Mayor is hereby authorized to execute said Agreement. Section 3. Authorization of City Manager. The City Manager is hereby authorized to do all things necessary to effectuate this Resolution. Section 4. Effective Date. This Resolution will become effective upon adoption. R2024 Agreement with Advanced Roofing Page 1 of 2 PASSED AND ADOPTED this 2111 day of Mar K,--20 � . Lari a SveAin, Mayor Maurk, io Betancgr, CMC, City Clerk APPROVED AS TO FORM AND LEGAL SUFFICIENCY: wjjj4 &61"4W Iain E. Boileau for Nabors, Giblin & Nickerson, P.A., City Attorney e Moved by: C� Seconded by: S `JOS Vote: Mayor Svechin (Yes) (No) Vice Mayor Lama (Yes) (No) Commissioner Joseph (Yes) (No) Commissioner Stuyvesant (Yes) (No) Commissioner Viscarra (Yes) (No) @BCL@140B2EEA.doc Page 2 of 2 122 `+uNNY fs� 04 tO r n AGREEMENT BETWEEN THE CITY OF SUNNY ISLES z BEACH AND ADVANCED ROOFING, INC. F ' FLOP T` sUNnNo1 CONTRACT NO. 2024-7612 THIS CONTRACTUAL AGREEMENT (hereinafter referred to as the "Agreement") is made in duplicate, this ZCy of March, 2024, by and between the CITY OF SUNNY ISLES BEACH, Florida, (hereinafter referred to as "City"), and ADVANCED ROOFING, INC, a corporation authorized to do business in the State of Florida (hereinafter referred to as "Contractor") whose Federal I.D. # is 59-2360591. RECITALS WHEREAS, the City is in need of Contractor to provide citywide emergency roof inspection, maintenance, and repair services for municipal buildings, including but not limited to the Government Center, Gateway Center, and Pelican Community Park, on an as - needed basis ("Services"); and WHEREAS, Contractor is a certified and insured company with the necessary experience to provide the desired Services; and WHEREAS, City of Sunrise issued Invitation to Bid ("ITB") 19 -17 -12 -HR "Roof Maintenance and Repairs" and awarded an agreement to Advanced Roofing, Inc., beginning June 1, 2019, for an initial three (3) year term, terminating on May 31, 2022, with the option to renew for three (3) additional one (1) year terms; and WHEREAS, on April 10, 2023, the City of Sunrise exercised its option to renew its agreement with Contractor, through May 31, 2024, which is appended hereto as Attachment "E;" and WHEREAS, the City previously entered into an Agreement with Contractor for the Services on February 25, 2022, for a term of four (4) months, and in an amount not -to -exceed Five Thousand Five Hundred Thirty Dollars and Fifty Cents ($5,530.50); and WHEREAS, on April 13, 2022, the City amended its original Agreement with Contractor for additional Services, via Resolution No. 2022-3314, in an amount not -to -exceed Five Hundred Thousand Dollars and No Cents ($500,000.00); and WHEREAS, the original Agreement between City and Contractor has expired, although the City remains in need of the Services; and WHEREAS, of the original Five Hundred Thousand Dollars and No Cents ($500,000.00) the City Commission authorized via Resolution No. 2022-3314, Three Hundred Thirty -One Thousand Nine Hundred Seventy -Eight Dollars and Seventy -Five Cents ($331,978.75) is unexpended and remains available for additional Services; and WHEREAS, the City desires to enter into a new Agreement with Contractor, using City of Sunrise's solicitation information, Contractor's response, and the resulting contract, to provide the additional Services described in Attachment "A," as more particularly described in Contractor's proposals appended as Attachment "B," all of which are attached hereto and made part hereof, subject to the terms and conditions contained herein; and ADVANCED ROOFING INC. City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 (305) 947-0606 phone (305) 949-3113 Fax WHEREAS, pursuant to the City's procurement code provisions, purchases made under state, county or other governmental contracts, or competitive bids with other entities are exempt from the City's competitive bidding procedures; and WHEREAS, the City wishes to contract with Contractor to provide the desired Services, as more particularly described in Attachments "A" and `B" for the previously authorized and existing unexpended amount of Three Hundred Thirty -One Thousand Nine Hundred Seventy - Eight Dollars and Seventy -Five Cents ($331,978.75); NOW THEREFORE, in consideration of the promises and the mutual covenants herein name, the parties agree as follows: TERMS 1. RECITALS. The Recitals set forth above are hereby incorporated into this Agreement and made a part hereof for reference. 2. THE CONTRACT DOCUMENTS. The Contract Documents consist of this Agreement, the terms and conditions of the City of Sunrise issued ITB 19 -17 -12 -HR "Roof Maintenance and Repairs," the City of Sunrise awarded agreement with Contractor effective June 1, 2019, as well as Contractor's proposals to the City which are specifically incorporated herein and made a part hereof as Exhibits "A" and `B" (hereinafter referred to as "Contract Documents"). 3. SERVICES. Contractor shall provide the services pursuant to the terms and conditions set forth in the City of Sunrise issued Invitation to Bid ("ITB") 19 -17 -12 -HR "Roof Maintenance and Repairs" and awarded agreement, attached hereto as Exhibit "A," as well as the proposals to the City attached hereto as Exhibit `B" (hereinafter referred to as "Services"). The Services shall be performed by Contractor to the full satisfaction of the City. Contractor agrees to furnish all labor and material in a good and workmanlike and professional manner to perform Services. Contractor agrees to have a qualified representative to audit and inspect the Services provided on a regular basis to ensure all Services are being performed in accordance with the City's needs and pursuant to the terms of this Agreement and shall report to the City accordingly. Contractor agrees to immediately inform the City via telephone and in writing of any problems that could cause damage to the City's property, improvements and persons. Contractor will require its employees to perform their work in a manner befitting the type and scope of work to be performed. In the event that the Contractor fails to complete the Services pursuant to the terms of this contract and City must undertake the completion of performance of Services, Contractor agrees to indemnify the City for all costs incurred with respect to the completion of those Services and any damages the City may suffer as a result of the Contractor's failure to perform the Services. 4. TERM. Subject to the provisions relating to the termination of this Agreement as set forth hereunder, the term of this Agreement shall commence upon full execution of the Agreement, and shall terminate one (1) year thereafter. The City shall have the option at its sole discretion to renew this Agreement for an additional one (1) year term. ADVANCED ROOFING, INC. 2 City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 (305) 947-0606 phone (305) 949-3113 Fax The terms of Sections 16 and 17 entitled "Indemnification and Waiver of Liability," and "Compliance with Law," respectively, shall survive termination of this Agreement. 5. COMPENSATION. During the term of this Agreement, the City shall pay Contractor for Services performed under this Agreement, in a total amount not to exceed the previously authorized and existing open Purchase Order amount of Three Hundred Thirty -One Thousand Nine Hundred Seventy -Eight Dollars and Seventy -Five Cents ($331,978.75). Payment to Contractor for all charges and tasks under this Agreement shall be in accordance with the Contract Documents and the schedule of charges reflected as reflected in Exhibit `B," under the following conditions: Payment to Contractor for all charges and tasks under this Agreement shall be in accordance with the Contract Documents and the schedule of charges as reflected in Exhibit "A" for the term of the Agreement, under the following conditions: A. Disbursements. There are no reimbursable expenses associated with this contract except for expenses approved by the City Manager. B. Payment Schedule. Invoices received from the Contractor pursuant to this Agreement will be reviewed by the initiating City Department. Payment will be made by the City in accordance with Section 4.12 of the City of Sunrise ITB attached as Exhibit "A". If services have been rendered in conformity with the Agreement, the invoice will be sent to the Finance Department for payment. Invoices must reference the contract number assigned hereto. C. Availability of Funds. The City's performance and obligation to pay under this Agreement is contingent upon an annual appropriation for its purpose by the City Commission. If the City should not appropriate or otherwise make available funds sufficient to purchase the Services procured pursuant to this Agreement, the City may unilaterally terminate any and all contractual or other obligations herein without any further liability or penalty upon twenty (20) days' notice to Contractor. D. Final Invoice. In order for both parties herein to close their books and records, the Contractor will clearly state "final invoice" on the Contractor's final/last billing to the City. This certifies that all services have been properly performed and all charges and costs have been invoiced to the City. Since this account will thereupon be closed, any other additional charges, if not properly included on this final invoice, are waived by the Contractor. Contractor shall make no other charges to the City for supplies, labor, taxes, licenses, permits, overhead or any other expenses or costs unless any such expense or cost is incurred by Contractor with the prior written approval of the City. If the City disputes any charges on the invoices, it may make payment of the uncontested amounts and withhold payment on the contested amounts until they are resolved by agreement with Contractor. Contractor shall not pledge the City's credit or make it a guarantor of payment or surety for any contract, debt, obligation, judgment, lien, or any form of indebtedness. The Contractor further warrants and represents that it has no obligation or indebtedness that would impair its ability to fulfill the terms of this Agreement. ADVANCED ROOFING, INC. 3 City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 (305) 947-0606 phone (305) 949-3113 Fax 6. INDEPENDENT CONTRACTOR RELATIONSHIP. The Contractor is an independent contractor and shall be treated as such for all purposes. Nothing contained in this Agreement or any action of the parties shall be construed to constitute or to render the Contractor an employee, partner, agent, shareholder, officer or in any other capacity other than as an independent contractor other than those obligations which have been or shall have been undertaken by the City. Contractor shall be responsible for any and all of its own expenses in performing its duties as contemplated under this Agreement. The City shall not be responsible for any expense incurred by the Contractor. The City shall have no duty to withhold any Federal income taxes or pay Social Security services and that such obligations shall be that of the Contractor, other than those set forth in this Agreement. Contractor shall furnish its own transportation, office and other supplies as it determines necessary in carrying out its duties under this Agreement. 7. INSURANCE. Contractor shall, at its sole cost and expense, during the period of any work being performed under this Agreement, procure and maintain the following minimum insurance coverage to protect the City and Contractor against all loss, claims, damage and liabilities caused by Contractor, its agents or employees, as indicated below: Commercial General Liability. Contractor agrees to maintain Commercial General Liability at a limit of liability not less than $1,000,000.00 for each Occurrence, $2,000,000 Annual Aggregate. Contractor agrees its coverage shall not contain any restrictive endorsement(s) excluding or limiting Product/Completed Operations, Independent Contractors, Broad Form Property Damage, X -C -U Coverage, Contractual Liability or Separation of Insureds. Additional Insured Endorsement. Contractor agrees to endorse the City as an Additional Insured on the Commercial General Liability with the following, or similar endorsement providing equal or broader Additional Insured coverage, the CG 20 26 07 04, or CG 20 26 04 13, Additional Insured — Designated Person or Organization endorsement; or the CG 20 10 07 04, or CG 20 10 04 13, Additional Insured — Owners, Lessees, or Contractors endorsement, including the additional endorsement of GC 20 37 07 04, or GC 20 04 13, Additional Insured — Owners, Lessees, or Contractors Completed Operations. The name of the organization endorsed as Additional Insured for all endorsements shall read "City of Sunny Isles Beach". Business Automobile Liability. Contractor agrees to maintain Business Automobile Liability, including the MCS -90 Motor Carrier Act Endorsement and/or CA 99 48 Pollution Liability - Broadened Coverage For Covered Autos - Business Auto, Motor Carrier and Truckers Coverage Forms Endorsement, at a minimum limit not less than $1,000,000 per occurrence providing coverage for damages against such third -parry liability, remediation and defense costs. In the event the policy includes a self-insured retention or deductible in excess of $25,000, the City reserves the right, but not the obligation, to review the Contractor's most recent annual report or audited financial statements. The Contractor agrees the policy shall be endorsed to include City as Additional Insured under CA 2048 Designated Insured Pollution Legal and Remediation Liability. Contractor agrees to maintain Third -Party Pollution Legal and Remediation Liability at a limit of liability not less than $1,000,000 Each Occurrence $2,000,000 Annual Aggregate. The Contractor agrees the policy shall ADVANCED ROOFING, INC. 4 City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 (305) 947-0606 phone (305) 949-3113 Fax include a minimum three (3) year discovery (tail) reporting period, and a retroactive date that equals or precedes the effective date of the Contract, or the performance of Work hereunder. In the event the policy is cancelled, non -renewed, switched to an occurrence form, retroactive date advanced, or any other event triggering the right to purchase a supplemental extended reporting period (SERP) during the life of this Contractor, Contractor agrees to purchase a SERP with a minimum reporting period not less than two (2) years. The requirement to purchase a SERP shall not relieve Contractor of the obligation to provide replacement coverage. The Contractor agrees the Self -Insured -Retention shall not exceed $25,000. This coverage may be provided on a Per -Project Basis. The Third - Party Pollution Legal and Remediation Liability shall be endorsed to include City as an Additional Insured. Worker's Compensation Insurance & Employers Liability. Contractor agrees to maintain Worker's Compensation Insurance & Employers Liability in accordance with Florida Statutes Chapter 440. Waiver of Subrogation. Contractor agrees by entering into this Contract to a Waiver of Subrogation for each required policy herein. When required by the insurer, or should a policy condition not permit Contractor to enter into a pre -loss agreement to waive subrogation without an endorsement, then Contractor agrees to notify the insurer and request the policy be endorsed with a Waiver of Transfer of Rights of Recovery Against Others, or its equivalent. This Waiver of Subrogation requirement shall not apply to any policy, which includes a condition specifically prohibiting such an endorsement, or voids coverage should Contractor enter into such an agreement on a pre -loss basis Umbrella or Excess Liability. Contractor agrees to maintain either a Commercial Umbrella or Excess Liability at a limit of liability not less than $1,000,000 Each Occurrence $2,000,000 Aggregate. The Contractor agrees to endorse the City as an "Additional Insured" on the Commercial Umbrella/Excess Liability, unless the Certificate of Insurance states the Commercial Umbrella/Excess Liability provides coverage on a pure/true follow - form basis, or the City is automatically defined as an Additional Protected Person. Insurance required of the Contractor shall be primary to, and not contribute with, any insurance or self-insurance maintained by the City. Such insurance shall not diminish Contractor's indemnification and obligations hereunder. The insurance policy shall be issued by companies authorized to do business under the laws of the State of Florida and acceptable to the City with a minimum A.M. Best rating of A -Excellent. Before any work under this Agreement is performed, and at any time upon request, Contractor shall furnish to the City certificates of insurance evidencing the minimum required coverage and shall be appropriately endorsed for contractual liability, with the City named as additional insured. All policies shall contain a waiver of subrogation endorsement. All policies and certificates shall be in forms and issued by insurance companies acceptable to the City Manager or his designee. All insurance policies and certificates of insurance shall provide that the policies may not be canceled or altered without thirty (30) days prior written notice to the City. Contractor shall also require and ensure that each of its sub -Contractors or sub -Contractors providing services hereunder (if any) procures and maintains, until the completion of the services, insurance of the types and to the limits specified herein. ANY EXCEPTIONS TO THE INSURANCE REQUIREMENTS IN THIS SECTION MUST BE APPROVED IN WRITING BY THE CITY. ADVANCED ROOFING, INC. City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 (305) 947-0606 phone (305) 949-3113 Fax 8. TERMINATION AND REMEDIES FOR BREACH. A. If, through any cause within reasonable control, the Contractor shall fail to fulfill in a timely manner or otherwise violate any of the covenants, agreements or stipulations material to this Agreement, the City shall have the right to terminate the Services then remaining to be performed. Prior to the exercise of its option to terminate for cause, the City shall notify the Contractor of its violation of the particular terms of the Agreement and grant Contractor ten (10) days to cure such default. If the default remains uncured after ten (10) days the City may terminate this Agreement, and the City shall receive a refund from the Contractor in an amount equal to the actual cost of a third parry to cure such failure. If Contractor fails, refuses or is unable to perform any term of this Agreement, City shall pay for services rendered as of the date of termination. 1. In the event of termination, all finished and unfinished documents, data and other work product prepared by Contractor shall be delivered to the City and the City shall compensate the Contractor for all Services satisfactorily performed prior to the date of termination. 2. Notwithstanding the foregoing, the Contractor shall not be relieved of liability to the City for damages sustained by it by virtue of a breach of the Agreement by Contractor and the City may reasonably withhold payment to Contractor for the purposes of set-off until such time as the exact amount of damages due the City from the Contractor is determined. B. Termination for Convenience of City. The City may, for its convenience and without cause terminate the Services then remaining to be performed at any time by giving Contractor ten (10) days written notice. The terms of Paragraph 8A(1) and A(2) above shall be applicable hereunder. C. Termination for Insolvency. The City also reserves the right to terminate the remaining Services to be performed in the event the Contractor is placed either in voluntary or involuntary bankruptcy or makes any assignment for the benefit of creditors. 9. CONFIDENTIAL INFORMATION. The Contractor shall not, either during the term of this Agreement or any time for a period of ten (10) years subsequent to that date upon which this Agreement shall terminate for any reason whatsoever, disclose to any person or entity, other than in the discharge of the duties of the Contractor under this Agreement, any information which the City designates in writing as "confidential." As a violation by the Contractor of the provisions of this Section could cause irreparable injury to the City and there is no adequate remedy at law for such violation, the City shall have the right, in addition to any other remedies available to it at law or in equity, to enjoin the Contractor from violating such provisions. 10. JURISDICTION, VENUE AND WAIVER OF JURY TRIAL. This Agreement shall be interpreted and construed in accordance with and governed by the laws of the State of Florida. All parties agree and accept that jurisdiction of any dispute or controversy arising out of this Agreement, and any action involving the enforcement or interpretation of any rights hereunder ADVANCED ROOFING, INC. City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 (305) 947-0606 phone (305) 949-3113 Fax shall be brought exclusively in the Eleventh Judicial Circuit in and for Miami Dade County, Florida, and venue for litigation arising out of this Agreement shall be exclusively in such state courts, forsaking any other jurisdiction which either party may claim by virtue of its residency or other jurisdictional device. In the event it becomes necessary for the City to file a lawsuit to enforce any term or provision under this Agreement and the City is the prevailing party then the City shall be entitled to its costs and attorney's fees at the pretrial, trial and appellate levels. BY ENTERING INTO THIS AGREEMENT, Contractor AND CITY HEREBY EXPRESSLY WAIVE ANY RIGHTS EITHER PARTY MAY HAVE TO A TRIAL BY JURY OF ANY CIVIL LITIGATION RELATED TO THIS AGREEMENT. Nothing in this Agreement is intended to serve as a waiver of sovereign immunity, or of any other immunity, defense, or privilege enjoyed by the City pursuant to Section 768.28, Florida Statutes. 11. NOTICES. All notices and other communications required or permitted to be given under this Agreement by either parry to the other shall be in writing and shall be sent (except as otherwise provided herein) (i) by certified or registered mail, first class postage prepaid, return receipt requested, (ii) by guaranteed overnight delivery by a nationally recognized courier service, or (iii) by electronic mail (e-mail) with confirmation receipt (with a copy simultaneously sent by certified or registered mail, first class postage prepaid, return receipt requested or by overnight delivery by traditionally recognized courier service), addressed to such party as follows: If to the City: Stan Morris With a copy to: City Manager City Attorney City of Sunny Isles Beach City of Sunny Isles Beach 18070 Collins Avenue 18070 Collins Avenue Fourth Floor Fourth Floor Sunny Isles Beach, Florida 33160 Sunny Isles Beach, Florida 33160 Tel: (305) 792-1776 Tel: (305) 792-1766 smorris sibfl.net aboileau n nlaw.com If to the Robert Kornahrens Contractor: Julian Olarte 1950 NW 22nd Street Fort Lauderdale, FL 33311 Tel: (954) 522-6868 robkgadvancedroofing com Juliano advancedroofin .com 12. PUBLIC RECORDS. The Contractor shall be required to comply with the following requirements under Florida's Public Records Law: A. Contractor shall keep and maintain public records required by the City to perform the service. B. Upon request from the City, Contractor shall provide the City with a copy of the requested records or allow the records to be inspected or copied within a reasonable time at a cost that does not exceed the cost provided by Chapter 119, Florida Statutes, or as otherwise provided by law. ADVANCED ROOFING, INC. City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 (305) 947-0606 phone (305) 949-3113 Fax C. Contractor shall ensure that public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed except as authorized by law for the duration of the contract term and following completion of the contract if the Contractor does not transfer the records to the City. D. Contractor shall, upon completion of the contract, transfer, at no cost, to the City all public records in possession of the Contractor or keep and maintain public records required by the City to perform the service. If the Contractor transfers all public records to the City upon completion of the contract, the Contractor shall destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. If the Contractor keeps and maintains public records upon completion of the contract, the Contractor shall meet all applicable requirements for retaining public records. All records stored electronically must be provided by Contractor to the City, upon request from the City, in a format that is compatible with the information technology systems of the City. IF THE Contractor HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE CONTRACTOR'S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO THIS CONTRACT, CONTACT THE CITY'S CUSTODIAN OF PUBLIC RECORDS AT (305) 792-1703, CityClerk@sibfl.net,18070 Collins Avenue, 4tn Floor, Sunny Isles Beach, Florida 33160. 13. AUDIT. The Contractor shall make available to the City or its representative all required financial records associated with the Agreement for a period of three (3) years. 14. NON-DISCRIMINATION. The Contractor agrees to comply with all local and state civil rights ordinances and with Title VI of the Civil Rights Act of 1984 as amended, Title VIII of the Civil Rights Act of 1968 as amended, Title 1 of the Housing and Community Development Act of 1974 as amended, Section 504 of the Rehabilitation Act of 1973, the Americans with Disabilities Act of 1990, the Age Discrimination Act of 1975, Executive Order 11063, and with Executive Order 11248 as amended by Executive Orders 11375 and 12086. The Contractor will not discriminate against any employee or applicant for employment because of race, color, creed, religion, ancestry, national origin, sex, disability or other handicap, age, marital/familial status, or status with regard to public assistance. The Contractor will take affirmative action to insure that all employment practices are free from such discrimination. Such employment practices include but are not limited to the following: hiring, upgrading, demotion, transfer, recruitment or recruitment advertising, layoff, termination, rates of pay or other forms of compensation, and selection for training, including apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided by the City setting forth the provisions of this non- discrimination clause. The Contractor agrees to comply with any Federal regulations issued pursuant to compliance with Section 504 of the Rehabilitation Act of 1973 (29 U.S.C. 708), which prohibits discrimination against the handicapped in any Federally assisted program. 15. CONFLICT OF INTEREST. The Contractor agrees to adhere to and be governed by Section 2-11.1, Miami -Dade County Code of Ordinances, as amended, and by Section 33-3, Code ADVANCED ROOFING, INC. City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 (305) 947-0606 phone (305) 949-3113 Fax of Ordinances of the City of Sunny Isles Beach, as amended, which are incorporated by reference herein as if fully set forth herein, in connection with the Agreement conditions hereunder. The Contractor covenants that it presently has no interest and shall not acquire any interest, directly or indirectly which should conflict in any manner or degree with the performance of Services under this Agreement. The Contractor further covenants that in the performance of this Agreement, no person having any such interest shall knowingly be employed by the Contractor. The Contractor guarantees that he/she has not offered or given to any member of, delegate to the Congress of the United States, any or part of this contract or to any benefit arising therefrom. 16. INDEMNIFICATION AND WAIVER OF LIABILITY. To the fullest extent permitted by law, the Contractor agrees to indemnify and hold -harmless the City, its agents, representatives, officers, directors, officials and employees from any claims, liabilities, damages, losses and costs, including, but not limited to, reasonable attorney fees to the extent cause, in whole or in part, by the professional negligence, error or omission of the Contractor or persons employed or utilized by the Contractor in performance of Services under this Agreement. Contractor shall at all times hereafter indemnify, hold harmless and, at the City's option, defend or pay for an attorney selected by the City to defend City, its agents, representatives, officers, directors, officials and employees from and against any and all causes of action, demands, claims, losses, liabilities and expenditures of any kind, including attorney fees, court costs, and expenses, caused or alleged to be caused by the intentional or negligent act of, or omission of Contractor, including those of their employees, agents, servants, or officers, or accruing, resulting from, or directly related to the subject matter of this Agreement including, without limitation, any and all claims, losses, liabilities, expenditures, demands or causes of action of any nature whatsoever resulting from injuries or damages sustained by any person or property. In the event any lawsuit or other proceeding is brought against City by reason of any such claim, cause of action or demand, Contractor shall, upon written notice from City, resist and defend such lawsuit or proceeding by counsel satisfactory to City. The provisions and obligations of this section shall survive the expiration or earlier termination of this Agreement. To the extent considered necessary by City, any sum due Contractor under this Agreement may be retained by City until all of City's claims for indemnification pursuant to this Agreement have been settled or otherwise resolved; and any amount withheld shall not be subject to payment of interest by City. The parties agree that One Hundred Dollars ($100.00) represents specific consideration to the Contractor for the indemnification set forth in this Agreement. 17. COMPLIANCE WITH LAW. Contractor shall comply with all laws, regulations and ordinances of any federal, state, or local governmental authority having jurisdiction with respect to this Agreement ("Applicable Laws") and shall obtain and maintain any and all material permits, licenses, approvals and consents necessary for the lawful conduct of the activities contemplated under this Agreement. 18. CONFLICTING PROVISIONS. The terms and conditions in this Agreement shall supersede and take priority over any inconsistent or conflicting provisions that are contained in any other document, including but not limited to Exhibit "A", `B", and "C". 19. SCRUTINIZED COMPANIES. Pursuant to Florida Statutes Section 287.135, and subject to limited exceptions contained therein, a company is ineligible to, and may not, bid on, ADVANCED ROOFING, INC. 9 City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 (305) 947-0606 phone (305) 949-3113 Fax submit a proposal for, or enter into or renew a contract with an agency or local governmental entity for goods or services if at the time of bidding, submitting a proposal for, or entering into or renewing a contract, the company is on the Scrutinized Companies that Boycott Israel List or is engaged in the boycott of Israel. Contractors must certify that the company is not participating in a boycott of Israel. Any contract for goods or services of One Million Dollars ($1,000,000) or more shall be terminated at the City's option if it is discovered that the company submitted a false certification, or at the time of bidding, submitting a proposal for, or entering into or renewing a contract, is listed on the Scrutinized Companies with Activities in Sudan List, the Scrutinized Companies with Activities in the Iran Terrorism Sectors List, created pursuant to Florida Statute Section 215.473, or is or has been engaged in business operations in Cuba or Syria, after July 1, 2018. Any contract entered into or renewed after July 1, 2018 shall be terminated at the City's option if the company is listed on the Scrutinized Companies that Boycott Israel List or engaged in the boycott of Israel. Contractors must submit the certification that is attached to this agreement as Attachment "C." Submitting a false certification shall be deemed a material breach of contract. The City shall provide notice, in writing, to the Contractor of the City's determination concerning the false certification. The Contractor shall have ninety (90) days following receipt of the notice to respond in writing and demonstrate that the determination was in error. If the Contractor does not demonstrate that the City's determination of false certification was made in error, then the City shall have the right to terminate the contract and seek civil remedies pursuant to Florida Statute Section 287.135. 20. E -VERIFY. Florida Statute 448.095 directs all public employers, including municipal governments, to verify the employment eligibility of all new public employees through the U.S. Department of Homeland Security's E -Verify System, and further provides that a public employer may not enter into a contract unless each parry to the contract registers with and uses the E -Verify system. Florida Statute 448.095 further provides that if a Contractor enters into a contract with a subcontractor, the subcontractor must provide the Contractor with an affidavit stating that the subcontractor does not employ, contract with, or subcontract with an unauthorized alien. In accordance with Florida Statute 448.095, Contractor is required to verify employee eligibility using the E -Verify system for all existing and new employees hired by Contractor during the contract term. Further, Contractor must also require and maintain the statutorily required affidavit of its subcontractors. It is the responsibility of Contractor to ensure compliance with E -Verify requirements (as applicable). To enroll in E -Verify, employers should visit the E -Verify website (https://www.e-verify.gov/employers/enrolling-in-e-verify) and follow the instructions. The Contractor must retain the I-9 Forms for inspection, and provide the attached E -Verify Affidavit, attached hereto as Exhibit "D." 21. MISCELLANEOUS. A. In the event any provision of this Agreement is found to be void and unenforceable by a court of competent jurisdiction, the remaining provisions of this Agreement shall nevertheless be binding upon the parties with the same effect as though the void or unenforceable provisions had been severed and deleted. B. This Agreement may be executed in multiple identical counterparts, each of which shall be deemed an original for all purposes. ADVANCED ROOFING, INC. 10 City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 (305) 947-0606 phone (305) 949-3113 Fax C. This Agreement shall constitute the entire agreement between the parties with respect to the subject matter hereof, and it shall supersede all previous and contemporaneous oral and written negotiations, commitments, agreements, and understandings relating hereto. D. Any modification of this Agreement shall be effective only if in writing and signed by the parties to this Agreement. E. No waiver of any provision of this Agreement shall be valid or enforceable unless such waiver is in writing and signed by the party granting such waiver. IN WITNESS WHEREOF, the parties hereto have executed this Agreement in duplicate on the day and year first written above. [SIGNATURE PAGE TO FOLLOW] ADVANCED ROOFING, INC. 11 City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 (305) 947-0606 phone (305) 949-3113 Fax ADVANCED ROOFING, INC. By: AvL— R6bert Kornahrens, President STATE OF FLORIDA: COUNTY OF BROWARD: The foregoing instrument was acknowledged before me by means of 8 physical presence or ❑ online notarization, this 26 day of March, 2024, by Robert Kornahrens as President of Advanced Roofing, Inc. (SEAL) 'A"FMHWUKMS .• wcoMMISSION#HH122418 EXPIRES. August 24,2M '''F�(t °•'� 80 *d Thu Noy PWk Undowksm Personally Known X or Produced Identification _ Type of Identification Produced: No y ublic, State of Florida (Sign - e of Notary Public) Faith Williams (Print, Type, or Stamp Commissioned Name of Notary Public) [ADDITIONAL SIGNATURE PAGE TO FOLLOW] ADVANCED ROOFING, INC. 12 City -of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 (305) 947-0606 phone (305) 949-3113 Fax ATTEST: y y CITY OF N ' Y, ISLES BEACH � N r BY: - BY' City Cle Department Head Svechin, Mayor APPROVED AS TO FORM AND LEGAL SUFFICIENCY BY: "azo lain E. Boileau, for Nabors, Giblin & Nickerson, P.A., City Attorney ADVANCED ROOFING, INC. 13 City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 (305) 947-0606 phone (305) 949-3113 Fax Attachment "A" ADVANCED ROOFING, INC. 14 City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 (305) 947-0606 phone (305) 949-3113 Fax Attachment "C" ADVANCED ROOFING, INC. 16 S`H riY ipF nm Y CONTRACTOR ANTI -BOYCOTT CERTIFICATION ➢�.. F'`o 0.,0 a`0 4 [PURSUANT TO FLORIDA STATUTE § 215.1351 I, Robert P. Kornahrens , on behalf of Advanced Roofing, Inc. , Print Name Company Name certifies that Advanced Roofing, Inc. does not: Company Name 1. Participate in a boycott of Israel; and 2. Is not on the Scrutinized Companies that Boycott Israel list; and 3. Is not on the Scrutinized Companies with Activities in Sudan List; and 4. Is not on the Scrutinized Companies with Activities in the Iran Terrorism Sectors List; and 5. Has not engaged in business operations in Cuba or Syria. Signature President Title 03.26.2024 Date City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 (305) 947-0606 phone (305) 949-3113 Fax Attachment "D" ADVANCED ROOFING, INC. 17 Florida Statute 448.095 directs all public employers, including municipal governments, to verify the employment eligibility of all new public employees through the U.S. Department of Homeland Security's E - Verify System, and further provides that a public employer may not enter into a contract unless each party to the contract registers with and uses the E -Verify system. Florida Statute 448.095 further provides that if a contractor enters into a contract with a subcontractor, the subcontractor must provide the contractor with an affidavit stating that the subcontractor does not employ, contract with, or subcontract with an unauthorized alien. In accordance with Florida Statute 448.095, all contractors doing business with the City of Sunny Isles Beach are required to verify employee eligibility using the E -Verify system for all existing and new employees hired by the contractor during the contract term. Further, the contractor must also require and maintain the statutorily required affidavit of its subcontractors. It is the responsibility of the awarded vendor to ensure compliance with E -Verify requirements (as applicable). To enroll in E -Verify, employers should visit the E -Verify website (https://www.a-verify.Rov/emplovers/enrolling-in-e-verify) and follow the instructions. The contractor must, as usual, retain the 1-9 Forms for inspection. By affixing your signature below you hereby affirm that you will comply with E -Verify requirements. Advanced Roofing, Inc. Company Name Offeror Signature Robert P. Kornahres Print Name 59-2360591 Federal Employer Identification Number (FEIN) 03.26.2024 Date President Title Sworn to and subscribed before me on this this 26 day of March , 2024. By Robert P. Kornahrens M Is personally known to me ❑ Has produced identification (type of identification produced: 1 attire of Notaryis Print or Stamp of Notary Public iR'r,►y,,. RUTH WILLIAMS WCOMMISSIOMM22418 i EXPIRES'August24,2025 }es a�;?', Bonded Tin Notary Rik UMwwft, 08.24.2025 Expiration Date City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 (305) 947-0606 phone (305) 949-3113 Fax Attachment "B" ADVANCED ROOFING, INC. 15 FINANCE & ADMIN. SERVICES DEPARTMENT Purchasing Division Phone: 954-572-2274 Fax: 954-578-4809 -Y. CITY OF �.-�� S —FISE F L O R I D A March 22, 2024 Sent Via Email robk advancedroofing.com Mr. Robert P. Kornahrens Advanced Roofing, Inc. 19520 NW 22nd Street Ft Lauderdale, FL 33311 Phone # 954-522-6868 (Emergency Phone # 954-649-8165) Vendor No. 438 Tyler-Munis Contract No. 2019000166 Subject: Third Renewal with CPI -U Adjustment — Bid No. 19 -17 -12 -HR Bid Title: Roofing Maintenance and Repairs Mr. Kornahrens, The above referenced Contract will expire on May 31, 2024. Pursuant to the Solicitation documents, the City reserves the right to renew the Contract for three (3) additional, one (1) year periods under the same specifications. A price adjustment is allowed at the time of renewal, in accordance with the annual CPI -U (the CPI -U from February 2023 to February 2024 is 3.1%), we accept your requested 3.1% increase. The City is utilizing the third and final renewal option for the period June 1, 2024 through May 31, 2025. Please see the attached documentation that provides a more detailed breakdown per line item. Please sign, date and return this acknowledgement along with a current certificate of insurance and email to hraphaelson ansunrisefl.gov or fax to number 954-578-4809. Best Regards, �4 C��'040-- Holly Raphaelson, MBA, C.P.M., CPPD, CPSM, NIGP-CPP Procurement Specialist We hereby acknowledge that the above contract is renewed for one year. Signature: /A Date: Robert P. Kornahrens Attachment: Schedule "A" (6 pages) 03.22.2024 10770 West Oakland Park Boulevard, Sunrise, FL 33351 SCHEDULE "A" City of Sunrise Bid No. 19 -17 -12 -HR PROJECT COST SHEET CONTRACTOR: Advanced Roofing Third Renewal 3.1% Increase Qty Pay Item No. Description Unit Price ITEM 1 ITEM 1-A Prior to Contractor beginning any other work at the site, Contractor shall remove the asbestos containing material using a licensed asbestos abatement Contractor. Removal shall be in accordance with the asbestos test laboratory survey report recommendations provided by the City. This allowance is to reimburse the Contractor for the actual cost incurred from asbestos abatement and it does not include any incidental costs. The proposed cost for asbestos abatement shall be approved prior to performing the work. A copy of the receipt is required for payment. 1 ITEM 1-B ALLOWANCE for Permits. Contractor markup and overhead is disallwoed. Payment shall be based on actual bona fide receipts 1 $ 3,794.41 ITEM 2 Furnish all materials, labor, and equipment for exisitng roof tear -off, Including existing insulation board down to substrate. This Rem also includes all disposal costs. ITEM 2-A Small Roof Repair Areas -0 S.F-500 SY S.F $ 5.93 ITEM 2-13 Medium Roof Repair/Replacement Areas -501 S.F-10,000 SY S.F $ 4.74 ITEM 2-13 Large Roof Repair/Replacement Areas -Over 10,001 S.F SY $ 3.56 ITEM 3 Furnish all materials, labor, and equipment to install approved Isotherm or polylsocyanurate rigid insulation board tapered, based on 1% inches thickness, fulty attached to substrate. A) MOPPED IN: ITEM 3A -A Small Roof Repair Areas -0 S.F-500 S.F S.F $ 4.74 ITEM 3A-13 Medium Roof Repair/Replacement Areas -501 S.F-10,000 SY S.F $ 4.15 ITEM 3A -C Large Roof Repair/Replacement Areas -Over 10,001 SY SY $ 2.96 B) MECHANICALLY ATTACHED ITEM 36-A Small Roof Repair Areas -0 S.F-500 SY S.F $ 5.93 ITEM 3B -B Medium Roof Repair/Replacement Areas -501 S.F-10,000 SY S.F $ 4.15 ITEM 36-13 Large Roof Repair/Replacement Areas -Over 10,001 SY SY $ 2.96 ITEM 4 Furnish all materials, labor, and equipment to install 4 ply modified bitumen system, with 2 -ply base fl shing, anchor sheet with vent sheet without insulation. ITEM 4-A Small Roof Repair Areas -0 S.F-500 SY $ 10.67 ITEM 4-13 Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F S.F $ 4.74 ITEM 4-C Large Roof Repair/Replacement Areas -Over 10,001 SY S.F $ 2.96 ITEM 5 Furnish all materials, labor, and equipment to install 4 ply modified bitumen system, with 2 -ply base flashing, anchor sheet, without vent sheet (uninsulated applications). A) MOPPED IN: ITEM 5A -A Small Roof Repair Areas -0 S.F-500 SY S.F $ 8.30 ITEM 5A-13 Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F S.F $ 4.74 ITEM 5A -C Large Roof Repair/Replacement Areas -Over 10,001 S.F S.F $ 2.37 B) MECHANICALLY ATTACHED ITEM 513-A Small Roof Repair Areas -0 S.F-500 S.F S.F $ 9.49 ITEM 513-13 Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F S.F $ 5.93 ITEM 513-C Large Roof Repair/Replacement Areas -Over 10,001 SY S.F $ 3.56 C) TORCHED DOWN ATTACHED: ITEM 5C -A Small Roof Repair Areas -0 S.F-500 S.F S.F $ 14.23 ITEM 5C-13 Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F S.F $ 4.74 ITEM 5C -C Large Roof Repair/Replacement Areas -Over 10,001 S.F S.F $ 2.96 D) ALUMINIUM ROOF COATING(FOR,REFLECTIVITY FOR BLACK ROOF SYSTEMS(SRI 68 MIN.): Such as 'a och" remium rubberized aluminium roof coating) ITEM 5D -A Small Roof Repair Areas -0 S.F-500 SY S.F $ 9.49 ITEM 513-13 Medium Roof Repair/Replacement Areas -501 S.F-10,000 SY S.F $ 4.45 ITEM 5D -C Large Roof Repair/Replacement Areas -Over 10,001 S.F S.F $ 2.96 ITEM 6 Furnish all materials, labor, and equipment to install approved cants, 1% inches thickness by 3% Inches wide. ITEM 6-A Small Roof Repair Areas -0 S.F-500 SY L.F $ 5.93 ITEM 6-13 Medium Roof Repair/Replacement Areas -501 S.F-10,000 SY L.F $ 1.19 ITEM 6-C Large Roof Repair/Replacement Areas -Over 10,001 SY L.F $ 0.59 ITEM 7 Furnish all materials, labor, and equipment to install flexible, non-metallic flashings, 18 inches wide. ITEM 7-A Small Roof Repair Areas -0 S.F-500 SY L.F $ 23.72 ITEM 7-13 Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F L.F $ 23.72 ITEM 7-C Large Roof Repair/Replacement Areas -Over 10,001 S.F L.F $ 17.79 ITEM 8 Furnish all materials, labor, and equipment to install built- up roof repair/replacement, including ea gravel protection. ITEM 8-A Small Roof Repair Areas -0 S.F-500 SY SY $ 11.86 ITEM 8-13 Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F SY $ 2.37 Qty Pay Item No. Description Unit Price ITEM 9 Furnish all materials, labor, and equipment to install built-up roof pea gravel. ITEM 9-A Small Roof Repair Areas -0 S.F-500 S.F S.F $ 11.86 ITEM 9-13 Medium Roof Repair/Replacement Areas -501 S.F-10,000 SY S.F $ 3.56 ITEM 10 Furnish all materials, labor, and equipment to install wall sheet metal flashing, 24-gauge stainless steel 8 inches wide. ITEM 10-A Small Roof Repair Areas -0 S.F-500 S.F L.F $ 14.23 ITEM 10-B Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F L.F $ 11.86 ITEM 10-C Large Roof Repair/Replacement Areas -Over 10,001 SY L.F $ 10.08 ITEM 11 Furnish all materials, labor and equipment to install continuous 4-inches metal drip edge A) 24 Gauge Galvanized Steel ITEM 11A-A Small Roof Repair Areas -0S.F-500SY L.F $ 21.34 ITEM 11A-B Medium Roof Repair/Replacement Areas-501 S.F-10,000 S.F L.F $ 17.79 ITEM 11A-C Large Roof Repair/Replacement Areas -Over 10,001 SY L.F $ 11.86 B) 24 Gauge Stainless Steel ITEM 11 B-A Small Roof Repair Areas -0 S.F-500 S.F L.F $ 22.53 ITEM 11 B-B Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F L.F $ 18.97 ITEM 11 BOC Large Roof Repair/Replacement Areas -Over 10,001 SY L.F $ 13.04 C) Copper ITEM 11C-A Small Roof Repair Areas -0S.F-500SY L.F $ 22.53 ITEM 11 C-B Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F L.F $ 18.97 ITEM 11 C-C Large Roof Repair/Replacement Areas -Over 10,001 SY L.F $ 13.04 D). Aluminum ITEM 11 D-A Small Roof Repair Areas -0 S.F-500 S.F L.F $ 22.53 ITEM 11 D-B Medium Roof Repair/Replacement Areas -501 S.F-10,000 SY L.F $ 18.97 ITEM 11 D-C Large Roof Repair/Replacement Areas -Over 10,001 SY L.F $ 13.04 ITEM 12 Furnish all materials, labor and equipment to install wall counter flashing 24-gauge stainless steel, surface mounted with springs lock reglet and 24-gauge stainless steel flashing, 6 inches vertical. ITEM 12-A Small Roof Repair Areas -0 S.F-500 SY L.F $ 23.72 ITEM 12-B Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F L.F $ 21.34 ITEM 12-C Large Roof Repair/Replacement Areas -Over 10,001 S.F L.F $ 17.79 ITEM 13 Furnish all material, labor and equipment to install metal coping cap, snap-lok system, 8-inches wide. A) 24 Gauge Galvanized Steel ITEM 13A-A Small Roof Repair Areas -0 S.F-500 S.F L.F $ 24.90 ITEM 13A-B Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F L.F $ 22.53 ITEM 13A-C Large Roof Repair/Replacement Areas -Over 10,001 S.F L.F $ 18.97 B) 24 Gauge Stainless Steel ITEM 1313-A Small Roof Repair Areas -0 S.F-500 SY L.F $ 26.09 ITEM 1313-13 Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F L.F $ 23.72 ITEM 136-C Large Roof Repair/Replacement Areas -Over 10,001 S.F L.F $ 20.16 C) Aluminum with Kynar Finish ITEM 13C-A Small Roof Repair Areas -0 S.F-500 SY L.F $ 26.09 ITEM 13C-B Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F L.F $ 23.72 ITEM 13C-C Large Roof Repair/Replacement Areas -Over 10,001 SY L.F $ 20.16 ITEM 14 Furnish all materials, labor and equipment to install pipe mounting pedestals(4), with equipment rail 3 feet x3 feet), and flashing, 18 inches high. EA. $ 889.31 ITEM 15 Furnish all materials, labor and equipment to install pitch pocket, for 6-inch diameter vertical element. EA. $ 207.51 ITEM 16 Furnish all materials, labor and equipment to install pipe or duct mountin roof pedestal, 18 gauge galvanised steel complete with flashing, 12 inches high. EA. $ 326.08 ITEM 17 Furnish all materials, labor, and equipment to install roof penetration flashings, stainless steel 26 GA., with sealant cover, for vertical 6-inch diameter element, 9 inches high, umbrella type. EA. $ 237.15 ITEM 18 Furnish all materials, labor, and equipment to install 12 inches high, 3 feet wide x 3 feet long, roof equipment support curbs, 1% inches thick 3 lbs., rigid insulation, 18 GA., Galvanized steel shell base plate and fully mitered 3 inches cant. EA. $ 533.59 ITEM 19 Furnish all materials, labor, and equipment to install rubber boot flashings for vertical round penetrations, typically vent stacks, 4-6 inches diameter, 8 inches high, complete with stainless steel clamps. EA. $ 88.93 ITEM 20 Furnish all materials, labor, and equipment to install 6-inch roof drains, standard dura-coated cast iron, steel inserts with strainer, and clamps (by Zurn, or City approved equal). EA. $ 1,422.90 ITEM 21 Furnish all materials, labor, and equipment to install expansion joint cover, without blocking. ITEM 21-A Small Roof Repair Areas-0 S.F-500 S.F L.F $ 35.57 ITEM 21-B Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F L.F $ 29.64 ITEM 21-C Large Roof Repair/Replacement Areas-Over 10,001 SY L.F $ 23.72 ITEM 22 Furnish all materials, labor, and equipment to install plumbing vent flashing, lead sleeve and coupling, installed 4-inch pipe EA. $ 88.93 ITEM 23 Furnish all materials, labor, and equipment to install 8 inches high x 16 inches wide metal scu er, 4 sided with Integral drip strip and surface re let flashing. ITEM 23-A 124 Gauge Galvanized Steel EA. 1 $ 177.86 Qty Pay Item No. Description Unit Price ITEM 23-B 24 Gauge Stainless Steel EA. $ 355.73 ITEM 24 Furnish all materials, labor, and equipment to install 6 -inch diameter leader. A) 24 Gauge Galvanized Steel ITEM 24A -A Small Roof Repair Areas -0 S.F-500 SY L.F $ 14.23 ITEM 24A -B Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F L.F $ 11.86 ITEM 24A -C Large Roof Repair/Replacement Areas -Over 10,001 SY L.F $ 11.86 B) 24 Gauge Stainless Steel ITEM 24B -A Small Roof Repair Areas -0 S.F-500 S.F L.F $ 23.72 ITEM 24B-13 Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F L.F $ 17.79 ITEM 24B -C Large Roof Repair/Replacement Areas -Over 10,001 SY L.F $ 17.79 C)_ Anodized Aluminum ITEM 24C -A Small Roof Repair Areas -0 S.F-500 S.F L.F $ 21.34 ITEM 24C-13 Medium Roof Repair/Replacement Areas -501 S.F-10,000 SY L.F $ 15.41 ITEM 24C -C Large Roof Repair/Replacement Areas -Over 10,001 SY L.F $ 15.41 ITEM 25 Furnish all materials, labor, and equipment to install continuous 4 -inch -wide metal utters stem A) 24 Gauge Galvanized Steel ITEM 25A -A Small Roof Repair Areas -0 S.F-500 S.F L.F $ 5.93 ITEM 25A-13 Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F L.F $ 5.93 ITEM 25A -C Large Roof Repair/Replacement Areas -Over 10,001 SY L.F $ 5.93 B) 24 Gauge Stainless Steel ITEM 25B -A Small Roof Repair Areas -0 S.F-500 SY L.F $ 23.72 ITEM 25B -B Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F L.F $ 14.23 ITEM 25B -C Large Roof Repair/Replacement Areas -Over 10,001 SY L.F $ 14.23 C) Anodized Aluminum ITEM 25C -A Small Roof Repair Areas -0 S.F-500 SY L.F $ 21.34 ITEM 25C -B Medium Roof Repair/Replacement Areas -501 S.F-10,000 SY L.F $ 11.86 ITEM 25C -C Large Roof Repair/Replacement Areas -Over 10,001 SY L.F $ 11.86 ITEM 26 The following time costs are for emergency work only as authorized by the City of Sunrise: ITEM 26-A Supervisor (Labor price should be included in your bid for items indicated) Regular Rate HR. $ 59.29 Overtime Rate HR. $ 59.29 ITEM 26-B Journeyman (Labor price should be included in your bid for items indicated) Regular Rate HR. $ 88.93 Overtime Rate HR. $ 88.93 ITEM 26-C Roofer's Helper (Labor price should be included in your bid for items indicated) Regular Rate HR. $ 65.22 Overtime Rate HR. $ 65.22 ITEM 27 Furnish all matertals, labor, and equipment to install 60 Mil, Type II, fabric reinforced Uniform EPDM with a Class 'A' Rating. The membrane is to be mechanically fastened through the metal deck system (approved warranty method as manufactured by 'Carlisle Syntec' for existing warrantled system. ITEM 27-A Small Roof Repair Areas -0 S.F-200 SY S.F $ 2.37 ITEM 27-B Medium Roof Repair/Replacement Areas -200 S.F-2,000 SY S.F $ 1.78 ITEM 27-B Large Roof Repair/Replacement Areas -Over 2,000 S.F S.F $ 0.89 ITEM 28 Furnish all materials, labor, and equipment to install 60 Mil, fabric reinforced Uniform TPO (Thermoplastic Polyolefin Sheet) with exposed white face, min. SRI 78, fully adhered / mechanically fastened system as manufactured by 'Carlisle Syntec for existing approved warrantied system. The membrane is to be mechanically fastened through the metal deck system or adhered to concrete deck (approved warranty method as manufactured by 'Carlisle Syntec' or other manufacturer for existing warrantied system). ITEM 28-A Small Roof Repair Areas -0 S.F-500 SY S.F $ 7.11 ITEM 28-B Medium Roof Repair/Replacement Areas -501 S.F-3,000 SY S.F $ 4.15 ITEM 28-C Large Roof Repair/Replacement Areas -Over 3,000 S.F S.F $ 5.34 ITEM 29 Furnish all materials, labor, and equipment to install Built Up Coal Tar Roofing system with membrane ply sheets as indicated ITEM 29-A Small Roof Repair Areas -0 S.F-500 SY S.F $ 7.11 ITEM 29-B Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F SY $ 7.11 ITEM 29-C Large Roof Repair/Replacement Areas -Over 10,000 S.F SY $ 7.11 ITEM 30 Furnish all materials, labor, and equipment for existing roof tear- off, down to substrate. This item also includes all disposal costs A). Asphalt Shingles ITEM 30A -A Small Roof Repair Areas -0 S.F-500 S.F S.F $ 7.71 ITEM 30A-13 Medium to Large Roof Repair Area -501 SY and Up S.F $ 7.11 B) Concrete/Clay Tile ITEM 30B -A Small Roof Repair Areas -0 S.F-500 SY SY $ 14.23 ITEM 3013-13 Medium to Large Roof Repair Area -501 SY and Up S.F $ 11.86 C) Standing Seam Metal Roof Qty Pay Item No. Description Unit Price ITEM 30C -A Small Roof Repair Areas -0 S.F-500 S.F SY $ 17.79 ITEM 30C -B Medium to Large Roof Repair Area -501 S.F and Up S.F $ 15.41 D) Metal Shingles ITEM 30D -A Small Roof Repair Areas -0 S.F-500 SY SY $ 17.79 ITEM 30D -B Medium to Large Roof Repair Area -501 SY and Up S.F $ 15.41 ITEM 31 Furnish all materials, labor, and equipment for the replacement of deteriorated wood substrates - A) 618- inch CDX Plywood . ITEM 31A -A Small Roof Repair Areas -0 S.F-500 SY S.F $ 5.34 ITEM 31A -B Medium to Large Roof Repair Area -501 SY and Up S.F $ 4.15 B) 2 -inches x 6 -Inch T&G Wood(Fir) ITEM 31 B -A Small Roof Repair Areas -0 S.F-500 SY S.F $ 11.86 Curved Roof S.F $ 11.86 ITEM 31 B -B Medium to Large Roof Repair Area -501 SY and Up S.F $ 9.49 Curved Roof S.F $ 9.49 ITEM 32 Furnish all materials, labor, and equipment to install the underlayment materials. A) 6 Mil Polyethylene Sheet ITEM 32A -A Small Roof Repair Areas -0 S.F-500 S.F S.F $ 0.59 ITEM 32A -B Medium to Large Roof Repair Area -501 SY and Up S.F $ 0.47 B) 30 Lbs. Felts Saturated Organic . ITEM 3213-A Small Roof Repair Areas -0 S.F-500 SY S.F $ 2.37 ITEM 326-13 Medium to Large Roof Repair Area -501 S.F and Up S.F $ 2.96 C) Self -Adhering underlayment granular face sheet. 55 Mils. Fiberglass mat reinforced and SBS asphalt ITEM 32C -A Small Roof Repair Areas -0 S.F-500 SY S.F $ 4.74 ITEM 32C -B Medium to Large Roof Repair Area -501 S.F and Up S.F $ 4.15 D) Self -Adhering underlayment polyethylene sheet. 40 Mils. Slip resisting polythene film. ITEM 32D -A Small Roof Repair Areas -0 S.F-500 SY S.F $ 5.93 ITEM 32D -B Medium to Large Roof Repair Area -501 SY and Up S.F $ 5.34 E) Self- Adhering sheet underlayment, high temperature sheet. 40 Mils, with slip resisting polyethylene to surface laminated to SBS modified asphalt adhesive ITEM 32E -A Small Roof Repair Areas -0 S.17-500 S.F SY $ 5.93 ITEM 32E -B Medium to Large Roof Repair Area -501 SY and Up S.F $ 5.34 F)' Slip sheet building' paper. 5 lbs/100 S.F rosin sized ITEM 32F -A Small Roof Repair Areas -0 S.F-500 S.F S.F $ 0.59 ITEM 32F -B Medium to Large Roof Repair Area -501 SY and Up S.F $ 0.30 ITEM 33 Furnish all materials, labor, and equipment to install pressure treated blocking. A) 2x4 ITEM 33A -A Small Roof Repair Areas -0 S.F-500 SY S.F $ 5.93 ITEM 33A -B Medium to Large Roof Repair Area -501 SY and Up S.F $ 4.74 B)- 2x6 ITEM 336-A Small Roof Repair Areas -0 S.F-500 S.F S.F $ 7.11 ITEM 3313-13 Medium to Large Roof Repair Area -501 S.F and Up S.F $ 5.93 C) 2X8 ITEM 33C -A Small Roof Repair Areas -0 S.F-500 SY SY $ 11.86 ITEM 33C -B Medium to Large Roof Repair Area -501 SY and Up SY $ 9.49 ITEM 34 Furnish all materials, labor, and equipment to install sheet metal flashings and trim. A) 24 Gauge Stainless Steel Drip Edge- 4Inch Profile ITEM 34A -A Small Roof Repair Areas -0 S.F-500 SY L.F $ 14.23 ITEM 34A -B Medium to Large Roof Repair Area -501 S.F and Up L.F $ 11.86 ITEM 35 Furnish all materials, labor, and equipment to install metal gutter. A) 6 -inch x 6 -Inch 24 Gauge Galvanized Steel Gutter ITEM 35A -A Small Roof Repair Areas -0 S.F-500 S.F L.F $ 29.64 ITEM 35A -B Medium to Large Roof Repair Area -501 S.F and Up L.F $ 23.72 B), 6 -Inch x 6 -inch Aluminum Gutter ITEM 35A -A Small Roof Repair Areas -0 S.F-500 SY L.F $ 32.02 ITEM 35A -B Medium to Large Roof Repair Area -501 SY and Up L.F $ 26.09 ITEM 36 Furnish all materials, labor and equipment to install rigid standard ridge vent, high density polypropylene or UV -Stabilized plastic ITEM 36-A Small Roof Repair Areas -0 S.F-500 S.F L.F $ 11.86 ITEM 36-B Medium to Large Roof Repair Area -501 S.F and Up L.F $ 9.49 ITEM 37 Furnish all materials, labor and equipment to install glass fiber reinforced asphalt shingles, mineral -granular surfaced self-sealing. ITEM 37-A Small Roof Repair Areas -0 S.F-500 SY S.F $ 4.74 ITEM 37-B Medium to Large Roof Repair Area -501 S.F and Up S.F $ 4.15 ITEM 38 Furnish all materials, labor, and equipment to install 20 oz. Copper shingles 34 -inches x 12 -inches, 2 clips per panel. ITEM 38-A Small Roof Repair Areas -0 S.F-500 SY SY $ 17.79 ITEM 38-B Medium to Large Roof Repair Area -501 S.F and Up S.F $ 17.79 Qty Pay Item No. Description Unit Price ITEM 39 Furnish all materials, labor.and equipment to install galvanized steel sheet, .0276 inch with siliconized pol ester coating A) Standing Seam ITEM 39A -A Small Roof Repair Areas -0 S.F-500 SY S.F $ 18.97 ITEM 39A-13 Medium to Large Roof Repair Area -501 SY and Up S.F $ 17.79 B) Batten Seam ITEM 3913-A Small Roof Repair Areas -0 S.F-500 SY S.F $ 11.86 ITEM 396-13 Medium to Large Roof Repair Area -501 S.F and Up S.F $ 10.67 ITEM 40 Furnish all materials, labor, and equipment to install aluminum sheet, coil coated alloy, .040 Inch with siliconized polyester coating. A)' Standing Seam - ITEM 40A -A Small Roof Repair Areas -0 S.F-500 SY S.F $ 20.16 ITEM 40A-13 Medium to Large Roof Repair Area -501 SY and Up S.F $ 18.97 B) Batten Seam ITEM 40B -A Small Roof Repair Areas -0 S.F-500 SY S.F $ 13.04 ITEM 406-13 Medium to Large Roof Repair Area -501 SY and Up S.F $ 11.86 C) Flat Seam ITEM 40C -A Small Roof Repair Areas -0 S.F-500 SY S.F $ 13.04 ITEM 40C-13 Medium to Large Roof Repair Area -501 SY and Up S.F $ 11.86 D) Ridge Metal Building Roofing (Through Metal Building Manufacturer) ITEM 40D -A Small Roof Repair Areas -0 S.F-500 SY S.F $ 14.23 ITEM 40D-13 Medium to Large Roof Repair Area -501 SY and Up S.F $ 11.86 ITEM 41 Furnish all materials, labor, and equipment to install clay roof tile. A) Spanish"S" Tile ITEM 41A -A Small Roof Repair Areas -0 S.F-500 SY SY $ 13.04 ITEM 41A-13 Medium to Large Roof Repair Area -501 SY and Up SY $ 11.86 B) Barrel Tile ITEM 41A -A Small Roof Repair Areas -0 S.F-500 SY SY $ 13.04 ITEM 41A-13 Medium to Large Roof Repair Area -501 S.F and Up SY $ 11.86 ITEM 42 Furnish all materials, labor and equipment to install 4" diameter leader A) 24 Gauge Galvanized Steel ITEM 42A -A Small Roof Repair Areas -0 S.F-500 SY S.F $ 9.49 ITEM 42A-13 Medium to Large Roof Repair Area -501 S.F and Up S.F $ 8.30 B) Anodized Aluminium ITEM 4213-A Small Roof Repair Areas -0 S.F-500 SY S.F $ 10.67 ITEM 426-13 Medium to Large Roof Repair Area -501 SY and Up S.F $ 9.49 C) 24 Gauge Stainless Steel ITEM 42C -A Small Roof Repair Areas -0 S.F-500 SY S.F $ 13.04 ITEM 42C-13 Medium to Large Roof Repair Area -501 SY and Up S.F $ 11.86 ITEM 43 Furnish all materials, labor and equipment to install concrete roof the A) Spanish"S„ Tile ITEM 43A -A Small Roof Repair Areas -0 S.F-500 SY S.F $ 11.86 ITEM 43A-13 Medium to Large Roof Repair Area -501 SY and Up S.F $ 10.67 B) Flat Shingle ITEM 4313-A Small Roof Repair Areas -0 S.F-500 S.F S.F $ 10.67 ITEM 436-13 Medium to Large Roof Repair Area -501 SY and Up S.F $ 10.08 ITEM 44 Supplies not listed or included elsewhere MAY be purchased under this contract on a strictly COST-PLUS arrangement only. Documentation of vendor cost must be provided with v,vritten (City) estimates. Provide percent markup. City staff estimates approximately $25,000 worth of this type of material will be required per year. EA. ITEM 45 Crane Rental ALLOWANCE - based upon receipts and as authorized by the City. Qty Pay Item No. Description Unit Price Annual inspections of all roof types to be included in a Roofing Inspection Report. Roofing Inspection and Report. The report will be comprehensive and include a quote for repairs formatted in line with the contract. The quote shall identify emergency, remedial and replacement cost. Report shall include but not be limited to the following: 1. All roofing inspection roofing numbering system shall conform with the City of Sunrise building numbers. Vendor shall coordinate the proper building numbers with the City representative to ensure inclusion into the report. 2. Providing information of the roof (i.e. date of installation, based on permitting documents, roof characteristics and geometry, roof type, roof square footage, and any ITEM 46 other information that may be required). S.F 3. Providing color images or photos, within the body of the report, identifying the roofing area, condition, and deficiencies that may require immediate attention. 4. Date of estimated need for replacement. 5. LOS as follows: A=10 or more years of service life remaining; 13=8 to 10 yearsof service life remaining; C=5 to 7 years of service life remaining; D=2 to 4 years of service life remaining; F= Less than 1 yearof service Jife remaining. $ 0.07 H. Total Cost $ 10,475.78 FI WNCE & ADMIN. SERVICES DEPARTMENT Purchasing Division Phone. 954-572-2274 Far: 9S4-578-4809 CITY OF "�- NUNRISE F L O R I D A April 10, 2023 Sent Via Email robk0advancedroofina,.corn Mr. Robert P. Kornahrens Advanced Roofing, Inc. 19520 NW 22nd Street Ft Lauderdale, FL 33311 Phone # 954-522-6868 (Emergency Phone # 954-649-8165) Vendor No. 438 Tyler -Monis Contract No. 2019000166 Subject. Second Renewal with CPI -U Adjustment: Roofing Maintenance & Repairs Bid No. 19 -17 -12 -HR Mr. Kornahrens, The above referenced Contract will expire on May 31, 2023. Pursuant to the Solicitation documents, the City reserves the right to renew the Contract for three (3) additional, one (1) year periods under the same specifications. A price adjustment is allowed at the time of renewal, in accordance with the annual CPI -U (the CPI -U from February 2022 to February 2023 is 6%), we accept your requested 6% increase. The City is utilizing the second renewal option for the period June 1, 2023 through May 31, 2024. Attached are the contracted items and adjusted prices. Please see the attached documentation that provides a more detailed breakdown per line item. Please sign, date and return this acknowledgement along with a current certificate of insurance and email to hraphaelson@sunrisefl.gov or fax to number 954-578-4809. Best Regards, Holly Raphaelson, MSA, C.P.M., CPPD, CPSM, NIGP-CPP Contracts Administrator We hereby acknowledge that the above contract is renewed for one year. Authorized Signature: f Printed Name: c,+ Robert P.-Kornahrens Attachment: Schedule "A" (5 pages) 10770 West Oakland Park Boulevard, Sunrise, FL 33351 Second Renewal Qty Pay Item No. Description Unit 6% Increase ITEM 7 ITEM 1-A Prior to Contractor beginning any other work at the site, Contractor shall remove the asbestos containing material using a licensed asbestos abatement Contractor. Removal shall be in accordance with the asbestos test laboratory survey report recommendations provided by the City. This allowance is to reimburse the Contractor for the actual cost incurred from asbestos abatement and it does not include any incidental costs. The proposed cost for asbestos abatement shall be approved prior to performing the work. A copy of the receipt is required for payment. 1 0.00 ITEM 1-13 ALLOWANCE for Permits. Contractor markup and overhead is disallwoed. Payment shall be based on actual bona fide receipts 1 3,680.32 ITEM 2 Furnish all materials, labor, and equipment for exisitng roof tear -off, including existing insulation board down to substrate. This item also includes all disposal costs. ITEM 2-A Small Roof Repair Areas -0 S.F-500 S.F S.F 5.75 ITEM 2-13 Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F S.F 4.60 ITEM 2-13 Large Roof Repair/Replacement Areas -Over 10,001 S.F S.F 3.45 ITEM 3 Furnish all materials, labor, and equipment to install approved isotherm or polyisocyanurate rigid insulation board tapered, based on 11/2 inches thickness, fully attached to substrate. A) MOPPED IN: ITEM 3A -A Small Roof Repair Areas -0 S.F-500 S.F S.F 4.60 ITEM 3A -B Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F S.F 4.03 ITEM 3A -C Large Roof Repair/Replacement Areas -Over 10,001 S.F S.F 2.88 B) MECHANICALLY ATTACHED ITEM 3B -A Small Roof Repair Areas -0 S.F-500 S.F S.F 5.75 ITEM 3B -B Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F S.F 4.03 ITEM 313-B Large Roof Repair/Replacement Areas -Over 10,001 S.F S.F 2.88 ITEM 4 Furnish all materials, labor, and equipment to install 4 ply modified bitumen system, with 2 -ply base fl shina, anchor sheet with vent sheet without insulation. ITEM 4-A Small Roof Repair Areas -0 S.F-500 S.F 10.35 ITEM 4-13 Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F S.F 4.60 ITEM 4-C Large Roof Repair/Replacement Areas -Over 10,001 S.F S.F 2.88 ITEM 5 Furnish all materials, labor, and equipment to install 4 ply modified bitumen system, with 2 -ply base flashing, anchor sheet, without vent sheet (uninsulated applications). A) MOPPED IN: ITEM 5A -A Small Roof Repair Areas -0 S.F-500 S.F S.F 8.05 ITEM 5A -B Medium Roof Repair/Replacement Areas -501 SX -110,000S.17 S.F 4.60 ITEM 5A -C Large Roof Repair/Replacement Areas -Over 10,001 S.F S.F 2.30 B) MECHANICALLY ATTACHED ITEM 5B -A Small Roof Repair Areas -0 S.F-500 S.F S.F 9.20 ITEM 513-B Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F S.F 5.75 ITEM 5B -C Large Roof Repair/Replacement Areas -Over 10,001 S.F S.F 3.45 C) TORCHED DOWN ATTACHED: ITEM 5C -A Small Roof Repair Areas -0 S.F-500 S.F S.F 13.80 ITEM 5C -B Medium Roof Repair/Replacement Areas -601 S.F-101000 S.F S.F 4.60 ITEM 5C -C Large Roof Repair/Replacement Areas -Over 10,001 S.F S.F 2.88 D) ALUMINIUM ROOF COATING(FOR REFLECTIVITY FOR BLACK ROOF SYSTEMS(SRI 68 MIN.): Such as'a och" premium rubberized aluminium roof coating) ITEM 5D -A Small Roof Repair Areas -0 S.F-500 S.F S.F 9.20 ITEM 51D-13 Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F S.F 4.31 ITEM 5D -C Large Roof Repair/Replacement Areas -Over 10,001 S.F S.F 2.88 ITEM 6 Furnish all materials, labor, and equipment to install approved cents, 11/2 inches thickness by 3% inches wide. ITEM 6-A Small Roof Repair Areas -0 S.F-500 S.F L.F 5.75 ITEM 6-13 Medium Roof Repair/Replacement Areas -601 S.17-101000 S.F L.F 1.15 ITEM 6-C Large Roof Repair/Replacement Areas -Over 109001 S.F L.F 0.58 ITEM 7 Furnish all materials, labor, and equipment to install flexible, non-metallic flashings, 18 inches wide. ITEM 7-A Small Roof Repair Areas -0 S.F-500 S.F L.F 23.00 ITEM 7-13 Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F L.F 23.00 ITEM 7-C Large Roof Repair/Replacement Areas -Over 10,001 S.F L.F 17.25 ITEM 8 Furnish all materials, labor, and equipmentto install built-up roof repair/replacement, including ea gravel protection. ITEM 8-A Small Roof Repair Areas -0 S.F-500 S.F S.F 11.50 ITEM 8-B Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F S.F 2.30 ITEM 9 Furnish all materials, labor, and equipment to install built-up roof pea gravel. ITEM 9-A Small Roof Repair Areas -0 S.F-500 SY S.F 11.50 ITEM 9-B Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F S.F 3.45 ITEM 10 Furnish all materials, labor, and equipment to install wall sheet metal flashing, 24 -gauge stainless steel 8 inches wide. ITEM 10-A Small Roof Repair Areas -0 S.F-500 SY L.F 13.80 ITEM 10-B Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F L.F 11.50 ITEM 10-C Large Roof Repair/Replacement Areas -Over 10,001 SY L.F 9.78 ITEM 11 Furnish all materials, labor and equipment to install continuous 4 -inches metal drip edge A) 24 Gauge Galvanized Steel ITEM 11A -A Small Roof Repair Areas -0 S.F-500 SY L.F 20.70 ITEM 11A -B Medium Roof Repair/ReplacementAreas -501 S.F-10,000 S.F L.F 17.25 ITEM 11A -C Large Roof Repair/ReplacementAreas -Over 10,001 SY L.F 11.50 B) 24 Gauge Stainless Steel ITEM 11 B -A Small Roof Repair Areas -0 S.F-500 SY L.F 21.85 ITEM 11 B -B Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F L.F 18.40 ITEM 11 BOC Large Roof Repair/Replacement Areas -Over 10,001 SY L.F 12.65 C) Copper ITEM 11C -A Small Roof Repair Areas -0 S.17-500 SY L.F 21.85 ITEM 11C -B Medium Roof Repair/Replacement Areas -501 S.F-10,000S.F L.F 18.40 ITEM 11 C -C Large Roof Repair/Replacement Areas -Over 10,001 SY L.F 12.65 D) Aluminum ITEM 11 D -A Small Roof Repair Areas -0 S.F-500 SY L.F 21.85 ITEM 11 D -B Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F L.F 18.40 ITEM 11 D -C Large Roof Repair/Replacement Areas -Over 10,001 SY L.F 12.65 ITEM 12 Furnish all materials, labor and equipment to install wall counter flashing 24 -gauge stainless steel, surface mounted with springs lock reglet and 24 -gauge stainless steel flashing, 6 inches vertical. ITEM 12-A Small Roof Repair Areas -0 S.F-500 SY L.F 23.00 ITEM 12-B Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F L.F 20.70 ITEM 12-C Large Roof Repair/Replacement Areas -Over 10,001 SY L.F 17.25 ITEM 13 Furnish all material, labor and equipment to install metal coping cap, snap-lok system, 8 -inches wide. A) 24 Gauge Galvanized Steel ITEM 13A -A Small Roof Repair Areas -0 S.F-500 SY L.F 24.15 ITEM 13A -B Medium Roof Repair/ReplacementAreas -501 S.F-10,000 S.F L.F 21.85 ITEM 13A -C Large Roof Repair/Replacement Areas -Over 10,001 SY L.F 18.40 B) 24 Gauge Stainless Steel ITEM 136-A Small Roof Repair Areas -0 S.F-500 S.F L.F 25.30 ITEM 13B -B Medium Roof Repair/Replacement Areas -501 S.F-10,000 SY L.F 23.00 ITEM 1313-C Large Roof Repair/Replacement Areas -Over 10,001 SY L.F 19.55 C) Aluminum with Kynar Finish ITEM 13C -A Small Roof Repair Areas -0 S.F-500 SY L.F 25.30 ITEM 13C -B Medium Roof Repair/ReplacementAreas -501 S.F-10,000 S.F L.F 23.00 ITEM 13C -C Large Roof Repair/Replacement Areas -Over 10,001 SY L.F 19.55 ITEM 14 Furnish all materials, labor and equipment to install pipe mounting pedestals(4), with equipment rail(3 feet x3 feet and flashina, 18 inches high. EA 862.58 ITEM 15 Furnish all materials, labor and equipment to install pitch pocket, for 6 -inch diameter vertical element. EA 201.27 ITEM 16 Furnish all materials, labor and equipment to install pipe or duct mountin roof pedestal, 18 au a galvanised steel complete with flashing, 12 inches hi h. EA 316.28 ITEM 17 Furnish all materials, labor, and equipment to Install roof penetration flashings, stainless steel 26 GA., with sealant cover, for vertical 6 -inch diameter element, 9 inches high, umbrella type. EA. 230.02 ITEM 18 Furnish all materials, labor, and equipment to install 12 inches high, 3 feet wide x 3 feet long, roof equipment support curbs, 1'/Z inches thick 3 lbs., rigid insulation, 18 GA., Galvanized steel shell base plate and fully mitered 3 inches cant FA. 517.55 ITEM 19 Furnish all materials, labor, and equipment to install rubber boot flashings for vertical round penetrations, typically vent stacks, 4-6 inches diameter, 8 inches high, complete with stainless steel clamps. EA. 86.26 ITEM 20 Furnish all materials, labor, and equipment to install 6 -inch roof drains, standard dura -coated cast iron, steel inserts with strainer, and clamps (by Zum, or City approved equal). FA. 1,380.12 ITEM 21 Furnish all materials, labor, and equipment to install expansion joint cover, without blocking. 0.00 ITEM 21-A Small Roof Repair Areas -0 S.F-500 SY L.F 34.50 ITEM 21-B Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F L.F 28.75 ITEM 21-C Large Roof Repair/Replacement Areas -Over 10,001 SY L.F 23.00 ITEM 22 Furnish all materials, labor, and equipment to install plumbing vent flashing, lead sleeve and coupling, installed 4 -inch pipe EA 86.26 ITEM 23 Furnish all materials, labor, and equipment to install 8 inches high x 16 inches wide metal scupper, 4 sided with inte ral drip strip and surface re let flashing. ITEM 23-A 24 Gauge Galvanized Steel EA. 172.52 ITEM 23-B 124 Gauge Stainless Steel FA. 345.03 ITEM 24 1 Furnish all materials, labor, and equipment to install 6 -inch diameter leader. A) 24 Gauge Galvanized Steel ITEM 24A -A Small Roof Repair Areas -0 S.F-500 SY L.F 13.80 ITEM 24A -B Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F L.F 11.50 ITEM 24A -C Large Roof Repair/Replacement Areas -Over 10,001 SY L.F 11.50 B) 24 Gauge Stainless Steel ITEM 246-A Small Roof Repair Areas -0 S.F-500 SY L.F 23.00 ITEM 24B -B Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F L.F 17.25 ITEM 24B -C Large Roof Repair/Replacement Areas -Over 10,001 S.F L.F 17.25 C) Anodized Aluminum ITEM 24C -A Small Roof Repair Areas -0 S.F-500 SY L.F 20.70 ITEM 24C -B Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F L.F 14.95 ITEM 24C -C Large Roof Repair/Replacement Areas -Over 10,001 SY L.F 14.95 ITEM 25 Furnish all materials, labor, and equipment to install continuous 4 -inch -wide metal utters stem A) 24 Gauge Galvanized Steel ITEM 25A -A Small Roof Repair Areas -0 S.F-500 SY L.F 5.75 ITEM 25A -B Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F L.F 5.75 ITEM 25A -C Large Roof Repair/Replacement Areas -Over 10,001 SY L.F 5.75 B) 24 Gauge Stainless Steel ITEM 25B -A Small Roof Repair Areas -0 S.F-500 S.F L.F 23.00 ITEM 256-13 Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F L.F 13.80 ITEM 256-C Large Roof Repair/Replacement Areas -Over 10,001 S.F L.F 13.80 C) Anodized Aluminum ITEM 25C -A Small Roof Repair Areas -0 S.F-500 S.F L.F 20.70 ITEM 25C -B Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F L.F 11.50 ITEM 25C -C Large Roof Repair/Replacement Areas -Over 10,001 SY L.F 11.50 ITEM 26 The following time costs are for emergency work only as authorized by the City of Sunrise: ITEM 26-A Supervisor (Labor price should be included in your bid for items indicated) Regular Rate HR. 57.51 Overtime Rate HR. 57.51 ITEM 26-B Journeyman (Labor price should be included in your bid for items indicated) Regular Rate HR. 86.26 Overtime Rate HR. 86.26 ITEM 26-C Roofer's Helper (Labor price should be included in your bid for items indicated) 0.00 Regular Rate HR. 63.26 Overtime Rate HR. 63.26 ITEM 27 Furnish all materials, labor, and equipment to install 60 Mil, Type II, fabric reinforced Uniform EPDM with a Class 'A' Rating. The membrane is to be mechanically fastened through the metal deck system (approved warranty method as manufactured by 'Carlisle Syntec' for existing warrantied system. ITEM 27-A Small Roof Repair Areas -0 S.F-200 SY S.F 2.30 ITEM 27-B Medium Roof Repair/Replacement Areas -200 S.F-2,000 SY S.F 1.73 ITEM 27-B Large Roof Repair/Replacement Areas -Over 2,000 S.F SY 0.86 ITEM 28 Furnish all materials, labor, and equipment to install 60 Mil, fabric reinforced Uniform TPO (Thermoplastic Polyolefin Sheet) with exposed white face, min. SRI 78, fully adhered / mechanically fastened system as manufactured by 'Carlisle Syntec for existing approved warrantied system. The membrane is to be mechanically fastened through the metal deck system or adhered to concrete deck (approved warranty method as manufactured by 'Carlisle Syntec' or other manufacturer for existing warrantied system). ITEM 28-A Small Roof Repair Areas -0 S.F-500 SY S.F 6.90 ITEM 28-B Medium Roof Repair/Replacement Areas -501 S.F-3,000 S.F S.F 4.03 ITEM 28-C Large Roof Repair/Replacement Areas -Over 3,000 SY S.F 5.18 ITEM 29 Furnish all materials, labor, and equipment to install Built Up Coal Tar Roofing system with membrane ply sheets as indicated ITEM 29-A Small Roof Repair Areas -0 S.F-500 ST SY 6.90 ITEM 29-B Medium Roof Repair/Replacement Areas -501 S.F-10,000 S.F SY 6.90 ITEM 29-C Large Roof Repair/Replacement Areas -Over 10,000 ST S.F 6.90 ITEM 30 Furnish all materials, labor, and equipment for existing roof tear- off, down to substrate. This item also includes all disposal costs A) Asphalt Shingles ITEM 30A -A Small Roof Repair Areas -0 S.F-500 S.F S.F 7.48 ITEM 30A -B Medium to Large Roof Repair Area -501 ST and Up S.F 6.90 B) Concrete/Clay Tile ITEM 3013-A Small Roof Repair Areas -0 S.F-500 S.F S.F 13.80 ITEM 3013-13 Medium to Large Roof Repair Area -501 SY and Up SY 11.50 C) Standing Seam Metal Roof ITEM 30C -A Small Roof Repair Areas -0 S.F-500 S.F S.F 17.25 ITEM 30C -B jMedium to Large Roof Repair Area -501 S.F and Up S.F 14.95 D) 1111letal Shingles ITEM 30D -A Small Roof Repair Areas -0 S.F-500 SY S.F 17.25 ITEM 30D -B Medium to Large Roof Repair Area -501 S.F and Up S.F 14.95 ITEM 31 Furnish all materials, labor, and equipment for the replacement of deteriorated wood substrates A) 5/8- inch CDX Plywood ITEM 31A -A Small Roof Repair Areas -0 S.F-500 SY S.F 5.18 ITEM 31A -B Medium to Large Roof Repair Area -501 SY and Up S.F 4.03 B) 2 -inches x 6 -inch T&G Wood(Fir) ITEM 31 B -A Small Roof Repair Areas -0 S.F-500 S.F S.F 11.50 Curved Roof S.F 11.50 ITEM 31113-13 Medium to Large Roof Repair Area -501 SY and Up S.F 9.20 Curved Roof S.F 9.20 ITEM 32 Furnish all materials, labor, and equipment to install the underlayment materials. A) 6 Mil Polyethylene Sheet ITEM 32A -A Small Roof Repair Areas -0 S.F-500 SY S.F 0.58 ITEM 32A-13 Medium to Large Roof Repair Area -501 S.F and Up S.F 0.46 B) 30 Lbs. Felts Saturated Organic ITEM 32B -A Small Roof Repair Areas -0 S.F-500 SY S.F 2.30 ITEM 32B -B Medium to Large Roof Repair Area -501 SY and Up S.F 2.88 C) Self -Adhering underlayment granular face sheet. 65 Mils. Fiberglass mat reinforced and SBS asphalt ITEM 32C -A Small Roof Repair Areas -0 S.F-500 SY S.F 4.60 ITEM 32C -B Medium to Large Roof Repair Area -501 SY and Up SY 4.03 D) Self -Adhering underlayment polyethylene sheet. 40 Mils. Slip resisting polythene film. ITEM 32D -A Small Roof Repair Areas -0 S.F-500 SY S.F 5.75 ITEM 32D -B Medium to Large Roof Repair Area -501 SY and Up SY 5.18 E) Self- Adhering sheet underlayment, high temperature sheet. 40 Mils, with slip resisting polyethylene top surface laminated to SBS modified asphalt adhesive ITEM 32E -A Small Roof Repair Areas -0 S.F-500 S.F S.F 5.75 ITEM 32E -B Medium to Large Roof Repair Area -501 SY and Up SY 5.18 F) Slip sheet building paper. 5 lbs/100 SY rosin sized ITEM 32F -A Small Roof Repair Areas -0 S.F-500 SY S.F 0.58 ITEM 3217-B Medium to Large Roof Repair Area -501 SY and Up SY 0.29 ITEM 33 Furnish all materials, labor, and equipment to install pressure treated blocking. A) 2x4 ITEM 33A -A Small Roof Repair Areas -0 S.F-500 SY S.F 5.75 ITEM 33A -B Medium to Large Roof Repair Area -501 SY and Up SY 4.60 B) 2x6 ITEM 33B -A Small Roof Repair Areas -0 S.F-500 ST SY 6.90 ITEM 3313-13 Medium to Large Roof Repair Area -501 ST and Up S.F 5.75 C) 2X8 ITEM 33C -A Small Roof Repair Areas -0 S.F-500 SY S.F 11.50 ITEM 33C -B Medium to Large Roof Repair Area -501 SY and Up S.F 9.20 ITEM 34 Furnish all materials, labor, and equipmentto install sheet metal flashings and trim. A) 24 Gauge Stainless Steel Drip Edge- 41nch Profile ITEM 34A -A Small Roof Repair Areas -0 S.F-500 SY L.F 13.80 ITEM 34A -B Medium to Large Roof Repair Area -501 SY and Up L.F 11.50 ITEM 35 Furnish all materials, labor, and equipment to install metal gutter. A) 6 -inch x 6 -inch 24 Gauge Galvanized Steel Gutter ITEM 35A -A Small Roof Repair Areas -0 S.F-500 SY L.F 28.75 ITEM 35A -B Medium to Large Roof Repair Area -501 ST and Up L.17 23.00 B) 6 -inch x 6 -inch Aluminum Gutter ITEM 35A -A Small Roof Repair Areas -0 S.F-500 SY L.F 31.05 ITEM 35A -B Medium to Large Roof Repair Area -501 ST and Up L.F 25.30 ITEM 36 Furnish all materials, labor and equipment to install rigid standard ridge vent, high density polypropylene or UV -Stabilized plastic ITEM 36-A Small Roof Repair Areas -0 S.F-500 SY L.F 11.50 ITEM 36-B Medium to Large Roof Repair Area -501 S.F and Up L.F 9.20 ITEM 37 Furnish all materials, labor and equipment to install glass fiber reinforced asphalt shingles, mineral -granular surfaced self-sealing. ITEM 37-A Small Roof Repair Areas -0 S.F-500 SY SY 4.60 ITEM 37-B Medium to Large Roof Repair Area -501 SY and Up SY 4.03 ITEM 38 Furnish all materials, labor, and equipment to install 20 oz. Copper shingles 34 -inches x 12 -inches 2 clips per panel. ITEM 38-A Small Roof Repair Areas -0 S.F-500 ST S.F 17.25 ITEM 38-B Medium to Large Roof Repair Area -501 SY and Up S.F 17.25 ITEM 39 Furnish all materials, labor.and equipment to install galvanized steel sheet, .0276 inch with siliconized polyester coating A) Standing Seam ITEM 39A -A Small Roof Repair Areas -0 S.F-500 S.F S.F 18.40 ITEM 39A -B Medium to Large Roof Repair Area -501 S.F and Up SY 17.25 B) Batten Seam ITEM 39B -A Small Roof Repair Areas -0 S.F-500 S.F S.F 11.50 ITEM 39B -B Medium to Large Roof Repair Area -501 SY and Up S.F 10.35 ITEM 40 Furnish all materials, labor, and equipment to install aluminum sheet, coil coated alloy, .040 inch with siliconized polyester coating. A) Standing Seam ITEM 40A -A Small Roof Repair Areas -0 S.F-500 SY SY 19.55 ITEM 40A-13 Medium to Large Roof Repair Area -501 SY and Up SY 18.40 B) Batten Seam ITEM 406-A Small Roof Repair Areas -0 S.F-500 ST S.F 12.65 ITEM 406-13 Medium to Large Roof Repair Area -501 SY and Up S.F 11.50 C) Flat Seam ITEM 40C -A Small Roof Repair Areas -0 S.F-500 S.F S.F 12.65 ITEM 40C-13 Medium to Large Roof Repair Area -501 S.F and Up SY 11.50 D) Ridge Metal Building Roofing (Through Metal Building Manufacturer) ITEM 40D -A Small Roof Repair Areas -0 S.F-500 SY S.F 13.80 ITEM 40D -B Medium to Large Roof Repair Area -501 SY and Up S.F 11.50 ITEM 41 Furnish all materials, labor, and equipment to install clay roof tile. A) Spanish"S" Tile ITEM 41 A -A Small Roof Repair Areas -0 S.F-500 SY SY 12.65 ITEM 41A -B Medium to Large Roof Repair Area -501 SY and Up S.F 11.50 B) Barrel Tile ITEM 41A -A Small Roof Repair Areas -0 S.F-500 S.F SY 12.65 ITEM 41A -B Medium to Large Roof Repair Area -501 SY and Up SY 11.50 ITEM 42 Furnish all materials, labor and equipment to install 4" diameter leader A) 24 Gauge Galvanized Steel ITEM 42A -A Small Roof Repair Areas -0 S.F-500 SY SY 9.20 ITEM 42A -B Medium to Large Roof Repair Area -501 SY and Up SY 8.05 B) Anodized Aluminium ITEM 42B -A Small Roof Repair Areas -0 S.F-500 SY S.F 10.35 ITEM 42B -B Medium to Large Roof Repair Area -501 SY and Up S.F 9.20 C) 24 Gauge Stainless Steel ITEM 42C -A Small Roof Repair Areas -0 S.F-500 S.F SY 12.65 ITEM 42C -B Medium to Large Roof Repair Area -501 SY and Up S.F 11.50 ITEM 43 Furnish all materials, labor and equipment to install concrete roof tile A) Spanish"S" Tile ITEM 43A -A Small Roof Repair Areas -0 S.F-500 SY S.F 11.50 ITEM 43A -B Medium to Large Roof Repair Area -501 S.F and Up S.F 10.35 B) Flat Shingle ITEM 43B -A Small Roof Repair Areas -0 S.F-500 S.F SY 10.35 ITEM 43B -B Medium to Large Roof Repair Area -501 S.F and Up S.F 9.78 ITEM 44 Supplies not listed or included elsewhere MAY be purchased under this contract on a strictly COST-PLUS arrangement only. Documentation of vendor cost must be provided with v,vritten (City) estimates. Provide percent markup. City staff estimates approximately $25,000 worth of this type of material will be required per year. EA. 0.00 ITEM 45 Crane Rental ALLOWANCE - based upon receipts and as authorized by the City. 0.00 ITEM 46 Annual inspections of all roof types to be included in a Roofing Inspection Report. Roofing Inspection and Report. The report will be comprehensive and include a quote for repairs formatted in line with the contract. The quote shall identify emergency, remedial and replacement cost. Report shall include but not be limited to the following: 1. All roofing inspection roofing numbering system shall conform with the City of Sunrise building numbers. Vendor shall coordinate the proper building numbers with the City representative to ensure inclusion into the report. 2. Providing Information of the roof (i.e. date of installation, based on permitting documents, roof characteristics and geometry, roof type, roof square footage, and any other information that may be required). 3. Providing color images or photos, within the body of the report, identifying the roofing area, condition, and deficiencies that may require immediate attention. 4. Date of estimated need for replacement. 5. LOS as follows: A=10 or more years of service life remaining; B=8 to 10 yearsof service life remaining; C=5 to 7 years of service life remaining; D=2 to 4 years of service life remaining; F= Less than 1 yearof service Jife remaining. S.F 0.07 H. Total Cost 10,160.80 CITY OF 9 F L 0 K I U A INVITATION FOR BID PURCHASING DIVISION Mailing Address: 10770 West Oakland Park Blvd. Sunrise, Florida 33351 Bid Data Bid Number: BID 19 -17 -12 -HR Service or Commodity Title: Roofing Maintenance & Repairs Purchasing Agent: Holly Raphaelson, C.P.M.,CPSM, CPPO Phone: (954)572-2202 Fax: (954) 578-4809 Email: hraphaelson()-sunrisefl.gov Bid Opening Day/Date: Wednesday, April 24, 2019 Time: 2:00 p.m. Physical Location: City Hall Office of the City Clerk — Fourth Floor 10770 West Oakland Park Blvd. Sunrise, FL 33351 Bid Contents Section 1: Specifications/Scope of Work Section 2: Attachments Section 3: Instructions to Bidders Section 4: Terms and General Conditions Section 5: Bid Submission Check List Section 6: Bid Submission Package Bid packages and specifications are no longer available directly from the City of Sunrise Purchasing Division. The City is now using Onvia DemandStar for the posting and distribution of all City Bids, RFPs, RFQs, RLIs and Quotations. This Bid may be obtained at www.demandstar.com. The City is not responsible for the accuracy of other means of distribution. Alteration of the content of this document shall result in disqualification. NOTE: If not submitting a bid, fill out and return the "Statement of No Bid" Form of this document. SPECIAL ACCOMMODATION: If a person decides to appeal any decision made by the board, agency, or commission with respect to any matter considered at such meeting or hearing, he or she will need a record of the proceedings, and that, for such purpose, he or she may need to ensure that a verbatim record of the proceedings is made, which record includes the testimony and evidence upon which the appeal is based F.S.S. 286.0105. The City does not tolerate discrimination in any of its programs, services or activities; and will not exclude participation in, deny the benefits of, or subject to discrimination anyone on the grounds of real or perceived race, color, national origin, sex, gender identity, sexual orientation, age, disability/handicap, religion, family or income status. BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS In compliance with the ADA and F.S.S. 286.26, any individual with a disability requesting a reasonable accommodation in order to participate in a public meeting should contact the City's ADA Coordinator at least 48 hours in advance of the scheduled meeting. Requests can be directed via e-mail to hr@sunrisefl.gov or via telephone to (954) 838-4522; Florida Relay: 711; Florida Relay (TIYNCO): 1-800-955-8771; Florida Relay (Voice): 1-800-955-8770. Every reasonable effort will be made to allow for meeting participation. Revised 6/27/18 Page 2 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS SECTION 1 — SPECIFICATIONS The work includes repairs to City owned buildings associated with roofing, re -roofing and roof repair components for various locations within the City. All items are based on a complete system i.e. 4 -ply SBS modified bitumen system (granular cap sheet). All installations shall meet all State of Florida requirements and Miami -Dade Notice of Acceptance (NOA) for high velocity. All Bidders shall have a State of Florida Roofing license and a State of Florida General Contractor's (CGC) license. The Contractor shall be a certified lightning protection Contractor through Underwriters Laboratory (UL). In addition, under no circumstance shall the roofer remove and not replace any existing lightning protection. Where lightning protection exists, it shall be the Contractor's responsibility to ensure that the lightning protection is adequate. USE OF PREMISES A. Use of Site: Limit use of premises to work areas. Contractor shall not be allowed to mobilize until such time the staging area has been accepted by the City representative. Contractor shall not disturb the site beyond areas in which the work is necessary. Any damage to public or private property resulting from the Contractor's activities shall be promptly resolved, repaired, managed, and paid for by the Contractor. 1. Limits: Confine operations to areas where work needs to take place. Avoid disturbing areas where no work is needed or required. 2. Owner Occupancy: Allow for Owner occupancy of site. 3. Public Occupancy: Allow for the public to use the site. Site includes streets and roadways which shall be kept open and usable at all times. 4. Driveways and Entrances: Keep driveways and entrances clear and available to owner, owner's employees, emergency vehicles, owner's tenants, users and public at all times. Do not use these areas for parking or storage of materials. a. Schedule deliveries to minimize use of driveways and entrances. b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site. B. Use of Staging Area: Maintain area assigned for staging in clean condition throughout working period. a. Repair damage caused by construction operations. b. Protect driveway, asphalt and access to adjoining areas during construction period. c. Enclose staging area with chain link fence. Fence is to include black screen mesh for dust control and to restrict visibility to the public. The staging area shall account for all necessary safety factors. COOPERATION OF CONTRACTORS, SUBCONTRACTOR AND MATERIALMEN A. The City of Sunrise reserves the right to bring other contractors to the site for work related to this project, or others. B. CONTRACTOR shall conduct the work so as to not interfere with the work of others. C. CONTRACTOR shall coordinate the work with that of others conducting work contiguously. Revised 6/27/18 Page 3 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS PERMITS A. The Contractor shall be required to pay and obtain all permits necessary from all agencies having jurisdiction. The Contractor shall comply with all permitting agency requirements. WORK RESTRICTIONS AND SPECIAL CONDITIONS A. CONTRACTOR shall allow for others to access the site for storage of materials and equipment for the connection of adjacent work, and for the execution of the work of others. B. To the best extent possible, the City of Sunrise has documented the interaction of others with the work of this contract. CONTRACTOR shall reasonably anticipate the activities of others within the site, for which no claim for additional work, additional time or impact will be allowed. C. When work of this contract requires connection or interaction of any type or kind with the work of others, CONTRACTOR shall inspect the work for completeness, accuracy, proper and correct interface and execution. Upon inspection, CONTRACTOR shall notify the City Representative, of any discrepancies, deviations, or defects. D. CONTRACTOR shall notify the City Representative of the progress in the work of other contractor's, when the work needs to interface with the CONTRACTOR's work. This information is to be used for coordination, tracking and scheduling the CONTRACTOR's work. E. CONTRACTOR's failure to inspect, schedule, coordinate, or observe progress of work of other contractor's, whose work must interface with the CONTRACTOR's work shall be fully responsible for the effects of time and costs. City will not recognize added costs, time extensions or claims. F. Damages, interference, delays and interruptions of work caused by other contractor's shall be addressed by the CONTRACTOR directly with the contractor's or individuals who caused the damages, delays and interruptions. G. Contractor shall have dumpsters on site to contain all debris. Dumpsters shall be acquired from All Service Refuse at 954-577-1135. RIGHTS TO COOPERATION A. The City of Sunrise reserves its right to expect and demand cooperation from any and all contractor's doing work within the City. B. When work of this Contract adjoins, abuts, is contiguous, or interfaces with the work of other contractor's, the City of Sunrise reserves the right to establish completions of the work, or portions of it, at the discretion of the City. C. City of Sunrise will use its discretion in establishing priorities in the completion of the work, or portions of it, based on the needs and operations at the City. D. All rebates for materials used under this contract must be turned over to the City of Sunrise. Contractor must assist The City to recover all rebates for Energy saving programs from any entity for covered materials used under this Contract. CONDITIONS DURING ADVERSE WEATHER CONDITIONS HURRICANES AND WEATHER RELATED CONCERNS: A. Because of the City's location and its exposure during the South Florida Hurricane season, CONTRACTOR shall be responsible for tracking, charting and following all information relating to storms. B. CONTRACTOR shall make all preparations in anticipation of hurricanes, tropical storms and other types of storms. C. CONTRACTOR shall make personnel available to discuss and coordinate all necessary activities affecting preparations for hurricanes and other weather related issues. Revised 6/27/18 Page 4 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS D. CONTRACTOR shall be responsible for providing all necessary means and methods for securing materials, equipment, temporary facilities, tools and all other associated items being used for the construction of this project. Any and all preparations must begin immediately after issuance of a hurricane watch by the National Hurricane Center. E. The City of Sunrise will not reimburse CONTRACTOR for costs associated with hurricane preparations and other weather related events. SITE SAFETY AND SECURITY: A. CONTRACTOR is responsible for all products, materials, equipment, tools and facilities used in, incorporated into and making part of this project. B. CONTRACTOR is responsible for providing security to the site, materials, products, tools, equipment, facilities, and vehicles used in the process of constructing the project. C. CONTRACTOR shall secure and protect from damage, all portions of the project, whether complete, partly constructed, or in the process of erection. D. CONTRACTOR's responsibility for security shall extend until final acceptance of the work by the City. E. CONTRACTOR shall be responsible for all claims associated with damages, vandalism, theft, robbery, or any other issue affecting acts of others, upon the work. F. CONTRACTOR's responsibility for protection of the work for this contract shall cover the project for the duration of the project. G. In addition to the CONTRACTOR's materials, products, tools, equipment, facilities and vehicles, the CONTRACTOR shall provide all requirements of the site for the duration of the project. H. CONTRACTOR shall preserve and protect all existing vegetation, whether on the site, or adjacent to it. I. Damage to adjacent vegetation by the CONTRACTOR shall be corrected to the satisfaction of the City at no cost to the City. DEBRIS AND UNSUITABLE MATERIAL: A. CONTRACTOR shall dispose of all debris and unsuitable materials promptly, so as to avoid accumulation. B. CONTRACTOR shall dispose of all debris and unsuitable material in a lawful and safe manner. C. CONTRACTOR shall utilize licensed disposal sites consistent with the products, materials and types of items being disposed. D. CONTRACTOR shall comply with local, state and federal laws in disposing debris and unsuitable materials. E. Fines, or levis for non-compliance with all applicable laws affecting the disposal of debris and unsuitable materials shall be the CONTRACTOR's responsibility. Revised 6/27/18 Page 5 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS SECTION 01400 — QUALITY CONTROL PART 1 —GENERAL 1.01 REFERENCES A. For products or workmanship specified by association, trade or other consensus standards, comply with requirements of the standard, except when more rigid requirements are specified or are required by applicable codes. B. Conform to reference standard by date of issue current on date specified in the individual specification sections, except where a specific date is established by code. C. Obtain copies of standards where required by product specification sections. D. The contractual relationship, duties, and responsibilities of the parties in the Contract nor those of the City Representative shall not be altered from the Contract Documents by mention or inference otherwise in any reference document. 1.02 MANUFACTURER'S SERVICES A. Where individual specification sections require material or product suppliers or manufacturers to provide qualified staff personnel to observe site conditions, conditions of surfaces and installation, quality of workmanship, start-up of equipment, test, adjust and balance of equipment as applicable, and to initiate instructions when necessary, this shall be done at no additional cost to the Owner. 1.1 SECTION INCLUDES A. Quality assurance — control of installation. B. Tolerances C. References D. Manufacturers' field services and reports. 1.2 QUALITY ASSURANCE CONTROL OF INSTALLATION A. Monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce work of specified quality. B. Comply with manufacturers' instructions, including each step in sequence. C. Should manufacturer's instructions conflict with Contract Documents, request clarification from City Representative before proceeding. D. Comply with specified standards as minimum quality for the work except where more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship. E. Perform work by persons qualified to produce workmanship of specified quality. F. Secure products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion, or disfigurement. Revised 6/27/18 Page 6 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS 1.3 TOLERENCES A. Monitor tolerance control of installed products to produce acceptable work. Do not permit tolerances to accumulate. B. Comply with manufacturers' tolerances. Should manufacturers' tolerances conflict with Contract Documents, request clarification from City Representative before proceeding. C. Adjust products to appropriate dimensions; position before securing products in place. PART 2 — PRODUCTS (Not Used) PART 3 — EXECUTION 3.01 EXAMINATION A. Verify that existing site conditions and substrate surfaces are acceptable for subsequent work. Beginning new work means acceptance of existing conditions. B. Verify that existing substrate is capable of structural support or attachment of new work being applied or attached. C. Examine and verify specific conditions described in individual specification sections. D. Verify that utility services are available, of the correct characteristics, and in the correct locations. 3.02 PREPARATION A. Clean substrate surfaces prior to applying next material or substance. B. Seal cracks or openings of substrate prior to applying next material or substance. C. Apply manufacturer required or recommended substrate primer, sealer, or conditioner prior to applying any new material or substance in contact or bond. 3.03 CORRECTION DEFECTS A. If during quality control activities, it is determined that a test failure or defect exists and that the construction has not been completed in accordance with the plans and specifications, the CONTRACTOR shall repair or replace such items (repair or replacement decision shall Be by the City of Sunrise Representative) at no additional cost to City of Sunrise. In addition, the cost to retest said item by the established utility control inspector after repair or replacement shall be borne by the CONTRACTOR through credit to City of Sunrise at the rates established within Section 01140. END OF SECTION 01400 Revised 6/27/18 Page 7 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS SECTION 01600 -- MATERIAL AND EQUIPMENT 1.01 SECTION INCLUDES A. Products B. Transportation and handling C. Storage and protection D. Project options 1.02 PRODUCTS A. Do not use materials and equipment removed from existing premises, except as specifically permitted by the Contract Documents. B. Provide interchangeable components of equal or better quality to components being replaced. 1.03 TRANSPORATION AND HANDLING A. Transport and handle products in accordance with manufacturers' instructions. B. Promptly inspect shipments to ensure that products comply with requirements, quantities are correct, and products are undamaged. C. Provide equipment and personnel to handle products by methods to prevent soiling, disfigurement, or damage. 1.04 STORAGE AND PROTECTION A. Store and protect products in accordance with manufacturers' instructions, with seals and labels intact and legible. B. For exterior storage of fabricated products, place on sloped supports, above ground. C. Cover products subject to deterioration with impervious sheet covering. Provide ventilation to avoid condensation or potential degradation of product. D. Store loose granular materials on solid flat surfaces in a well -drained area. Prevent mixing with foreign matter. E. Provide equipment and personnel to store products by methods to prevent soiling, disfigurement, or damage. F. Arrange storage of products to permit access for inspection. Periodically inspect to verify products are undamaged and are maintained in acceptable condition. 1.05 PRODUCT OPTIONS A. Substitutions: Submit a request for substitution for any manufacturer not named in accordance with the following article prior to the commencement of the project. PART 2 — PRODUCTS (Not Used) Revised 6/27/18 Page 8 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS PART 3 — EXECUTION (Not Used) END OF SECTION 01600 Revised 6/27/18 Page 9 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS PART 1 —GENERAL 1.01 SCOPE A. The work of this section shall consist of all labor, materials, equipment and incidentals necessaryto apply Roof Coating System at City of Sunrise as specified in the Manufacturer's specifications. Many different roof systems are used throughout the City of Sunrise, it is therefore recommended that the CONTRACTOR, prior to bid, inspect the existing facilities and conditions and become acquainted with those conditions which will affect work to be performed. Once the Purchase Order is issued, it will be the responsibility of the CONTRACTOR to complete any and all repairs under any and all circumstances and field conditions. B. The following items described minimum sizes of repairs/replacements which the CONTRACTOR can expect on any single Purchase Order: 1. 100 square feet for pressure cleaning. 2. 1,000 square feet for roof coatings. 3. 500 square feet for waterproofing systems. C. All repair work shall be approved by the City Representative prior to payment of invoice. Verification of leak repair prior to payment may, at the City of Sunrise's discretion, include inspection after a rain storm. D. The work includes but is not limited to the following: 1. Cleaning and preparation of substrate. 2. Application of primers, when required. 3. Detailing of flashings and penetrations. 4. Application of base coat on roof surface, when required. 5. Application of topcoat, finish coat on roof surface, when required. 1.02 DESCRIPTION OF WORK A. The CONTRACTOR's roof repairs shall comply with Manufacturer's Specifications for application of the product. 1.03 QUALITY CONTROL A. MANUFACTURERS: Provide primary products to be compatible with existing material. B. COORDINATION: The CONTRACTOR shall coordinate requirements of roofing and decking subcontractors so as to insure compatibility of installed systems. Modifications to respective specifications to meet manufacturer's requirements are the responsibility of the CONTRACTOR, subject to the review of the CITY's representative. C. Finished repairs must be solid and tight. Once a permit is obtained and paid for by the CONTRACTOR, the Building Department will inspect completed repairs and require a water test if necessary to verify proper adhesion and that the leak has been repaired. The CONTRACTOR shall rework at no additional cost to the CITY, any repair areas that are burned, delaminated, buckled, blistered, inadequately repaired or leaking water. D. The CONTRACTOR shall initiate repairs immediately (within 24 hours) upon receipt of a Purchase Order by the CITY. Revised 6/27/18 Page 10 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS SECTION 07410 — FLUID APPLIED WATERPROOFING PART 1 — GENERAL (Continued) E. PROTECTION OF FACILITITIES DURING INCLEMENT WEATHER: The CONTRACTOR is responsible for planning, scheduling and conducting its work in a manner that prevents the interior of the buildings from sustaining damage due to inclement weather. Any damage sustained during inclement weather is the sole responsibility of the contractor to repair. All repairs shall be made immediately to the City's satisfaction. F. REFERENCES: 1. ASTM — American Society for Testing and Materials, Philadelphia, PA. 2. FM — Factory Mutual System, Norwood, MA. 3. FS — Federal Specification. 4. NRCA — National Roofing Contractors Association, Chicago, IL. 5. SMACNA — Sheet Metal and Air Conditioning Contractors National Association, Vienna, VA. 6. UL — Underwriters Laboratories, Northbrook, IL. A. PRODUCT DATA: As request by the City Representative or the Building Department, submit manufacturer's product specifications, installation instructions and general recommendations for each principal roofing system coating is to be used for. Include data substantiating that materials comply with requirements, including certificates and delivery logs for bulk materials, and records on field testing to indicate the performance, fabrication procedures, and variations and accessories. B. MAINTENANCE INSTRUCTIONS Provide pre-printed maintenance instructions for the roof coating system. 1.05 PRODUCT HANDLING A. GENERAL: Handle and store roofing system products in a manner which will ensure no possibility of significant moisture pickup. Store in a dry, well ventilated, weatherproof place. Do not leave unprotected materials on roof overnight. Store rolls of felt and other sheet materials on end. B. ROOF LOADING: Do not store materials on roof decks, nor position roofing installation equipment on roof decks, in concentrations exceeding design live loading. Deliver materials to jobsite in new, dry, unopened, and well -marked containers showing product and manufacturer's name. Revised 6/27/18 Page 11 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS PART 1 — GENERAL (Continued) 1.06 JOB CONDITIONS A. WEATHER CONDITIONS: Proceed with roofing system installation only when existing and forecasted weather conditions are favorable and will allow work to proceed in accordance with requirements and recommendations of manufacturers of primary roofing system materials. B. FIELD MEASUREMENTS AND MATERIAL QUANTITIES: 1. The CONTRACTOR shall have sole responsibility for accuracy of all measurements, estimates of material quantities and sizes, and site conditions that will affect work. C. EXISTING CONDITIONS: 1. Building space directly under roof area covered by this specification will be utilized by ongoing operations. Do not interrupt City of Sunrise operations unless prior written approval is received from City of Sunrise. 2. Access to roof shall be from exterior of the building only. 1.07 GUARANTIES A. The CONTRACTOR shall provide manufacturer's and applicator's warranty in accordance with standard applications; however, in no event shall it be less than one (1) year for labor and five (5) years for material. PART 2 — PRODUCTS 2.01 ROOFING MATERIALS A. During course of work, Owner's representative may secure samples of materials being used from containers at job site and submit them to an independent laboratory for comparison to specified material. B. Should test results prove that a material is not functionally equal to the existing material: The CONTRACTOR shall pay for all testing. 2. Roofing installed and found not to comply with the specifications shall be removed and replaced at no change in the contract price. 3. Any defects of material or construction shall be removed and replaced. Revised 6/27/18 Page 12 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS SECTION 07410 — FLUID APPLIED WATERPROOFING (Continued) PART 2 — PRODUCTS(Continued) 2.02 ACCEPTABLE MANUFACTUERS A. PRODUCTS: Urecoats Inc. RSM -100 coating or City approved equal. Republic Powdered Metals Inc. GEOGARD and SOLARGARD coatings or City approved equal. PART 3 — EXECUTION 3.01 GENERAL INSTALLATION REQUIREMENTS A. All roof coatings must be applied per roof coating manufacturer's instructions outlined in the products' specifications. All work pertaining to roof appurtenances shall be completed per roof coating manufacturer's specifications. 3.02 SUBSTRATE PREPARATIONS A. All roof preparations shall strictly adhere to the roof coating manufacturer's instructions for the specific roof system outlined in the product's specifications. END OF SECTION 07410 Revised 6/27/18 Page 13 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS SECTION 07512 — BUILT-UP. SINGLE MEMBRANE, AND MISCELLANEOUS ROOF REPAIR PART 1 - GENERAL 1.01 SCOPE A. The work of this section shall consist of all labor, materials, equipment and incidentals necessary to repair roof systems at City of Sunrise as delineated on the typical repair Drawing No. 96U -4180S, Sheet Nos. 1 through 10 attached at the end of this section. Because many different roof systems are used throughout the City of Sunrise, the drawings and specifications do not cover every method of repair or inherent problem which the CONTRACTOR must overcome to complete the repair. It is, therefore, recommended that the CONTRACTOR, prior to bid, inspect the existing facilities and conditions and become acquainted with those conditions which will affect work to be performed. Once the repair purchase agreement is awarded, it will be the responsibility of the CONTRACTOR to complete any and all repairs under any and all circumstances and field conditions. B. The following items described minimum sizes of repairs/replacements which the CONTRACTOR can expect on any single Purchase Order: 100 square feet of flat roof repair. 2. 10 L. F. for wall copings, or flashings. 3. 2 each pitch pan repairs. 4. Recaulking 50 L.F. 5. 1 S.F. single ply membrane repair. 6. 100 S.F. water seal coating masonry walls. 7. 100 square feet for pressure cleaning. 8. 100 square feet for gravel removal vacuum. 9. 1,000 square feet for roof coating. 10. 500 square feet for waterproofing systems. C. All repair work shall be approved by the CITY REPRESENTATIVE prior to payment of invoice. Verification of leak repair prior to payment may, at the CITY REPRESENTATIVE's discretion, include inspection after a rain storm. 1.02 DESCRIPTION OF WORK A. The CONTRACTOR's roof repairs shall comply with typical repair as delineated on Drawing No. 96U -4180S, Sheet Nos. 1 through 10, attached at the end of this section. Revised 6/27/18 Page 14 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS SECTION 07512 — BUILT-UP ROOFING SINGLE MEMBBRANE AND MISCELLANEOUS ROOF REPAIR (Continued) PART 1 — GENERAL (Continued) B. The extent of built-up roofing work (BUR) is indicated on the drawings and by provisions of this section, and is defined to include roofing, vapor barriers (if any), composition flashing and demolition, and roofing accessories integrally related to roofing installation. A. MANUFACTURERS: Provide primary products to be compatible with existing material. City to approve product prior to installation. B. COORDINATION: The CONTRACTOR shall coordinate requirements of roofing and decking subcontractors so as to insure compatibility of installed systems. Modifications to respective specifications to meet manufacturer's requirements are the responsibility of the CONTRACTOR, subject to the review of the CITY's representative. C. Finished repairs must be solid and tight. The CITY REPRESENTATIVE will inspect completed repairs and water test if necessary to verify proper adhesion and that the leak has been repaired. The CONTRACTOR shall rework at no additional cost to the CITY, any repair areas designated by the CITY REPRESENTATIVE that are burned, delaminated, buckled, blistered, inadequately repaired or leaking water. D. The CONTRACTOR shall initiate repairs immediately (within 24 hours) upon receipt of a Purchase Order by the CITY. E. PROTECTION OF FACILITITIES DURING INCLEMENT WEATHER: The CONTRACTOR is responsible for planning, scheduling and conducting its work in a manner that prevents the interior of the buildings from sustaining damage due to inclement weather. F. REFERENCES: 1. ASTM — American Society for Testing and Materials, Philadelphia, PA. 2. FM — Factory Mutual System, Norwood, MA. FS — Federal Specification. 4. NRCA — National Roofing Contractors Association, Chicago, IL. 5. SMACNA — Sheet Metal and Air Conditioning Contractors National Association, Vienna, VA. 6. UL — Underwriters Laboratories, Northbrook, IL. Revised 6/27/18 Page 15 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS SECTION 07512 — BUILT-UP ROOFING SINGLE MEMBRANE AND MISCELLANEOUS ROOF REPAIR (Continued) PART 1 — GENERAL (Continued) 1.04 SUBMITTALS A. PRODUCT DATA: As requested by the CITY REPRESENTATIVE submit manufacturer's product specifications, installation instructions and general recommendations for each principal roofing system is to be used for. Include data substantiating that materials comply with requirements, including certificates and delivery logs for bulk materials, and records on field testing to indicate the performance, fabrication procedures, and variations and accessories. B. MAINTENANCE INSTRUCTIONS Provide pre-printed maintenance instructions for the roof coating system. 1.05 PRODUCT HANDLING A. GENERAL: Handle and store roofing system products in a manner which will ensure no possibility of significant moisture pickup. Store in a dry, well ventilated, weatherproof place. Do not leave unprotected materials on roof overnight. Store rolls of felt and other sheet materials on end. Roof Loading: Do not store materials on roof decks, nor position roofing installation equipment on roof decks, in concentrations exceeding design live loading. B. Deliver materials to jobsite in new, dry, unopened, and well -marked containers showing product and manufacturer's name. 1.06 JOB CONDITIONS A. WEATHER CONDITIONS: Proceed with roofing system installation only when existing and forecasted weather conditions are favorable and will allow work to proceed in accordance with requirements and recommendations of manufacturers of primary roofing system materials. B. FIELD MEASUREMENTS AND MATERIAL QUANTITIES: The CONTRACTOR shall have sole responsibility for accuracy of all measurements, estimates of material quantities and sizes, and site conditions that will affect work. C. EXISTING CONDITIONS: 1. Building space directly under roof area covered by this specification will be utilized by ongoing operations. Do not interrupt City of Sunrise operations unless prior written approval is received from City of Sunrise. 2. Access to roof shall be from exterior of the building only. Revised 6/27/18 Page 16 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS SECTION 07512 — BUILT-UP ROOFING SINGLE MEMBRANE AND MISCELLANEOUS ROOF REPAIR (Continued) PART 1 — GENERAL (Continued) 1.07 GUARANTIES A. During course of work, Owner's representative may secure samples of materials being used from containers at job site and submit them to an independent laboratory for comparison to specified material. PART 2 — PRODUCTS 2.01 ROOFING MATERIALS A. During course of work, Owner's representative may secure samples of materials being used from containers atjob site and submit them to an independent laboratory for comparison to specified material. B. Should test results prove that a material is not functionally equal to the existing material: The CONTRACTOR shall pay for all testing. 2. Roofing installed and found not to comply with the specifications shall be removed and replaced at no change in the contract price. 3. Any defects of material or construction shall be removed and replaced. 2.02 ACCEPTABLE MANUFACTUERS A. PRODUCTS: Products or systems specified herein shall be compatible to the existing roofing material. 2.03 MATERIAL A. ASPHALT: 1. Shall be TYPE IV Asphalt to meet ASTM D-312. 2. Shall have softening point of 210-225 degrees F when tested in accordance with ASTM D36. Shall perform a minimum 175 cycles when tested in accordance with ASTM D529 weatherometer test. 4. Shall have EVT of 345-395 degrees F when tested in accordance with ASTM D4402 at 125 centipoises. 5. Shall have a minimum flash point of 525 degrees F when tested in accordance with ASTM D92. 2.04 VENTED BASE PLY A. Shall be GAF Stratevest or City approved equal. Revised 6/27/18 Page 17 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS SECTION 07512 — BUILT-UP ROOFING SINGLE MEMBRANE AND MISCELLANEOUS ROOF REPAIR (Continued) PART 2 — PRODUCTS (Continued) 2.05 MEMBRANE APPLIES A. Shall be GAF Glass IV or City approved equal. Surface ply shall be modified granulated bitumen, 130 to 160 mills. 2.06 SHEET METAL FLASHING A. GALVANIZED STEEL: ASTM A525, G90; G1140; 24 -gauge core steel unless otherwise noted on the plans. B. LEAD: Sheet lead minimum of 3 pound per square foot. 2.07 FABRICATION OF SHEET METAL FLASHING A. Aluminum flashing sections shall have butt joints with aluminum cover. Embed all members in mastic. B. Aluminum roof expansion joint cover sections shall be joined by standing seams. 2.08 CANTS A. Cants shall be pressure treated wood or alternate material solid fiber. 2.09 ASPHALT PRIMER A. Asphalt primer shall conform to ASTM D41. 2.10 ASPHALT PLASTIC/FLASHING CEMENT A. Asphalt flashing cement shall conform ASTM D2822 Type I or 11. 2.11 FLASHING NAILS A. Flashing nails used with wood shall be 11 -gauge, barbed galvanized with 3/8 -inch diameter heads and of sufficient length to penetrate the full depth of the nailer strip. For masonry walls, case hardened nails specially designed may be used. Tin caps shall be used with these nails. Large head Simplex(R) nails may be used without tin caps. 2.12 TIN CAPS A. Shall be flat discs or caps of 28 -gauge galvanized, stainless steel, or 30 -gauge sheet metal, 2 inch or more in diameter and should meet Miami -Dade County & Florida Building Code. Bell shaped or cupped shaped caps are not acceptable. 2.13 FASTENER FOR BASE PLY ATTACHMENT (LIGHTWEIGHT CONCRETE) A. The fastener size should meet Miami -Dade County & Florida Building Code. The fasteners should be Factory Mutual Research Corporation (FMRC) approved. Revised 6/27/18 Page 18 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS SECTION 07512 — BUILT-UP ROOFING SINGLE MEMBRANE AND MISCELLANEOUS ROOF REPAIR (Continued) PART 3 - EXECUTION 3.01 GENERAL INSTALLATION REQUIREMENTS A. Installer must examine condition of substrates to receive BUR or single membrane systems, and conditions under which work will be performed, and notify the CONTRACTOR and CITY representative in writing of unsatisfactory conditions including inadequate provisions in substrate for bonding or anchorage of BUR system. Do not proceed with BUR system work until unsatisfactory conditions have been corrected in a manner acceptable to the installer. B. Protect other work from spillage of materials, and prevent liquid materials from entering or clogging drains and conductors. Replace/restore other work damaged by performance of the work. C. BITUMEN HEATING: Do not raise temperature above minimum normal fluid -holding temperature more than one hour prior to time of application; discard bitumen held at elevated temperature for period exceeding 3 hours. Do not heat bitumen above temperature required to ensure application viscosity resulting in adequate mopping weight and maximum penetration, coverage and adhesion of felt plies, and maximum adhesion to substrate. Determine flash point of bitumen and determine maximum fire -safe handling temperature, and not exceed that temperature in heating bitumen. 3.02 SPECIFICATION A. Roofing shall be compatible and equal to existing roofing material. 3.03 SUBSTRATE PREPARATIONS A. Decks shall be dry smooth, swept free of all dust, dirt, grime, debris, and kept clean of foreign materials and obstructions other than roofer's tools and equipment. Where applicable, gravel shall be removed and surface "spudded" prior to completing repair. 3.04 CANTS A. At the intersection of all roof and vertical surfaces to be flashed, cants shall be installed per the membrane manufacturer's requirements. 3.05 CLEANING A. All trash, debris, equipment, and parts, shall be removed from the job site. B. All damage and stains caused by work is this section shall be repaired or removed. 3.06 PROTECTION A. Finished roof shall be protected against roof traffic and construction damage. B. The installer of BUR system shall advise the CONTRACTOR (in writing) of recommended surveillance and protection during remainder of construction period, so that BUR system will be without damage or deterioration, other than natural weathering, at time of substantial completion of project. Revised 6/27/18 Page 19 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS ECTION 07512 — BUILT-UP ROOFING SINGLE MEMBRANE AND MISCELLANEOUS ROOF REPAIR (Continued) PART 3 — EXECUTION (Continued) 3.07 METAL FLASHINGS. CAPS AND DRIP EDGES A. Replace any defective metal flashings, counter flashings, drip edges, scuppers, gravel stops, metal rain caps and copings as authorized by CITY REPRESENTATIVE. Metal shall be copper, galvanized steel or stainless steel and conform to minimum specified thickness as per the Drawings. All new metal materials shall be of the same metal as existing abutting metal. Do not use dissimilar metals. B. All fasteners used to secure metal rain caps shall have watertight washers. Caulking sealant for counter -flashings shall be a pliable non -hardening butyl rubber. Repairs shall conform to one of the standard details for flashings, rain caps, drip edges, gravel stops and parapet walls as shown on the Drawings. C. AT PITCH POCKETS: Fabricate pitch pans. Sides: 100 mm (4 inches) high, hemmed to outside at top edge. Flange: 100 mm (4 inches) wide, completely around periphery. Clearance between projection and pitch pan: 50 mm (2 inches). Set flange in mastic. 2. Pack gap between roof -penetrating element and deck with compressible insulation. Seal with reinforcing membrane embedded between alternate courses of asphalt mastic. 3. Nail flange to wood blocking 75 mm (3 inches) o.c., staggered. 4. Prime metal flange, projection, and pitch pan interior with asphalt primer. 5. Install two (2) ply stripping described in general flashing requirements section. 6. Fill pitch pan to within 25 mm (1 inch) from top with non -shrink grout. Allow to set firm. 7. Fill pitch pan with asphalt mastic. Double fill if necessary. 8. Fabricate and install umbrella with draw band over pitch pan. Tighten draw band. 9. Wipe clean top of umbrella and projection with metal cleaner. Prime surface with metal primer 10. Caulk stack/sheet metal interface. Provide watershed. Revised 6/27/18 Page 20 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS SECTION 07512 — BUILT-UP ROOFING SINGLE MEMBRANE AND MISCELLANEOUS ROOF REPAIR (Continued) PART 3 — EXECUTION (Continued) A. REPAIR OF DEFICIENCIES: 1. Installations of details noted as deficient during final inspection must be repaired and corrected by applicator, and made ready for re -inspection. B. CLEANUP: 1. Immediately upon job completion, roof membrane and flashing surfaces shall be cleaned of debris. 3.09 PATCHING SINGLE PLY MEMBRANE A. Refer to Pay Item No. 2, 3 & 4 and Drawing No. 2, glue/epoxy the entire patch as per manufacturer's specifications. After the patch cools, check the entire surrounding perimeter of the patch for any voids. All areas to be patched must be clean and dry. 2. When patching over a seam highlight the underlying seam edge. 3. Patches are to be uniform, rectangular with rounded corners and a minimum of six inches (6") in width. 4. Whenever a seam requires multiple patches to the point where it becomes aesthetically displeasing, a minimum four inch (4") wide capping or tape strip should be applied over the incorrectly installed seam. END OF SECTION 07512 Revised 6/27/18 Page 21 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS SECTION 07520 — FLEXIBLE EXPANSION JOINT REPLACEMENT PART 1 - GENERAL A. SECTION INCLUDES: Removing damaged expansion joint, replace damaged roof membrane, pressure treated blocking, cant strips and anchor bolts. Install new flexible expansion joint with flange, glass fabric, followed with final surfacing of granulated modified bitumen cap sheet. 1.02 SUBMITTALS A. Submit manufacturer's product data. 1.03 PRODUCTS A. GAF Flexible Expansion Joint, or City approved equal. 1.04 EXECUTION A. Over the completed membrane, install a Flexible Expansion Joint with flange. Nail flange 6" o.c. staggered (end laps shall receive two nails) with end laps of flange set in a complete bed of flashing compound. Seal end laps and terminations of expansion joint according to Manufacturer's specification. Seal edge of flange with a 6" wide strip of Glass Fabric and two plies of Base Sheet, extending Base Sheet 4" and 6" beyond edge of flange, all plies set in asphalt. Follow with final surfacing of Modified Bitumen Cap Sheet, 160 mills. END OF SECTION 07520 Revised 6/27/18 Page 22 BID TITLE: BID 19 -17 -12 -HR PART 1 - GENERAL BID NUMBER: ROOFING MAINTENANCE & REPAIRS SECTION 07701 — GUTTER AND DOWNSPOUT REPLACEMENT 1.01 SCOPE The work of this section shall consist of all labor, materials, equipment and incidentals necessary to remove existing and furnish and install all new gutters, and downspouts as indicated by the CITY REPRESENTATIVE. 1.02 DESCRIPTION OF WORK A. The extent of work is indicated on the drawings and by provisions of this section, and is defined to include the following: 1. Gutters 2. Downspouts 1.03 QUALITY ASSURANCE A. Conform to SMACNA Manual for nominal sizing of components for rainfall intensity determined by a storm occurrence of 1 to 5 years. 1.04 DELIVERY, STORAGE AND HANDLING A. Stack preformed and prefinished material to prevent twisting, bending, or abrasion, and to aid ventilation. B. Prevent contact with materials during storage which may cause discoloration, staining, or damage. PART 2 - PRODUCTS 2.01 MATERIALS A. GALVANIZED SHEET: 24 -gauge cold roll metal, shop pre -coated with primer and finish color, as selected by the CITY REPRESENTATIVE. 2.02 COMPONENTS A. GUTTERS: Rectangular SMACNA style profile. B. DOWNSPOUTS: Square profile. C. END CAPS, GUTTER STRAPS, GUTTER HANGERS, GUTTER SPACERS, DOWNSPOUT SHOE, JOINT FASTENERS: Profiled to suit gutters and downspouts. 2.03 ACCESSORIES A. All attachments (straps, brackets, hangers, spacers) shall be concealed from view when possible at gutters and downspouts. B. PROTECTIVE BACKING PAINT: Zinc Chromate Alkyd. C. PAINT: Acrylic latex, satin finish, 2 coats Sherwin Williams "A-100 Satin Latex House and Trim", or City approved equal. Revised 6/27/18 Page 23 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS SECTION 07701 — GUTTER AND DOWNSPOUT REPLACEMENT (Continued) PART 2 - PRODUCTS (Continued) 2.04 FABRICATION A. Field measure site conditions prior to fabricating work. B. Fabricate with required connection pieces. C. Form sections square, true, and accurate in size, in maximum possible lengths and free of distortion or defects detrimental to appearance or performance. (Allow for expansion.) D. Hem exposed edges of metal. E. Fabricate gutter and downspout accessories; seal watertight. 3.01 EXAMINATION A. Verify that surfaces are ready to receive work and conditions are ready for installation. B. Beginning of installation means acceptance of existing conditions or substrate. 3.02 INSTALLATION A. Install gutters, downspouts, and accessories (in accordance with the manufacturer's instruction) with fasteners and attachments meeting the standards for wind resistance equal to or better than Factory Mutual Class 1-90. B. Join lengths with seams watertight. Flash and seal gutters to downspouts and accessories. C. Apply backing paint to metal back surfaces. D. Slope gutters as allowed by gravel stop drip flashing. END OF SECTION 07701 Revised 6/27/18 Page 24 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS SECTION 07920 — SEALANTS AND CAULKINGS PART 1 - GENERAL 1.01 REQUIREMENTS A. SECTION INCLUDES: Clean and prepare joint surfaces; install sealant and backing materials. 1.02 SUBMITTALS A. Submit manufacturer's product data. Include manufacturer's product handling, surface preparation, installation, and curing instruction and performance test data sheets for each type of sealant used. If two or more different sealants are to be in physical contact with each other (such as a parapet joints and reg let intersections), obtain from each manufacturer confirmation that its product is compatible with the proposed and adjacent products. B. Submit manufacturer's standard chart of sealant colors. City to select color. C. SAMPLES: One cartridge of each type and color of sealant to be used; samples of backing material. 1.03 QUALITY ASSURANCE A. APPLICATOR'S QUALIFICATIONS: Have a minimum of five (5) years' experience installing sealants. A list of projects which required sealant application shall be provided to confirm applicator's years of experience. B. JOINT TOLERANCE: All joints varying over 50% from design dimension shall be called to the attention of the CITY REPRESENTATIVE prior to sealant installation. Joint width/depth ratios are critical to sealant performance and compliance with those limitations is required. 1.04 WARRANTY A. Provide minimum two (2) year warranty. B. Replace sealants which fail because of loss of cohesion or adhesion or do not cure. C. Flat bur replacement, provide additional manufacture ten (10) year warranty. Revised 6/27/18 Page 25 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS SECTION 07920 — SEALANTS AND CAULKINGS PART 2 - PRODUCTS (Continued) 2.01 SEALANTS A. Subject to compliance with requirements, provide products equal to the following. Reference No. 1. Two or three component polyurethane sealant, FS -TT -S -227(e), Class A, Type I (self -leveling) and Type II (non -sag), as required; Shore A hardness of 30-40. Acceptable: Mameco International Vulkem 245, 227 and 922 Pecora Dynatorl II and NR -200 Sika Corporation Sikaflex 2C Tremco Dymeric (non -sag) and Dymeric 511 or THC 900 (self -leveling) L.M. Scofield Company Colorcalk (use at colored concrete) 2. One component, polyurethane or polysulfide sealant, FS -TT -S - 230(c), Class A, Type I (self -leveling) or Type II (non -sag), as required; Shore A hardness of 25-45. Acceptable: Mameco International Vulkem 45, 116 and 921 Pecora Dynatrol I and NR -201 Sika Corporation Sikaflex 1A Tremco Dymonic 3. One component silicone sealant, FS -TT -S -1543(a), Class A neutral cure construction sealant, minimum 1500% elongation, Shore A hardness of 15-25. Acceptable: Dow Corning 790 Tremco Spectrem 1 4. One component silicone sealant, (primer or primerless) for structural glazing; FS -TT -S-1 543(a), Class A (Acetoxy cure or Amid cure); Shore A hardness of 25-30. Acceptable: Dow Corning 999, 795 Pecora 863 Tremco Spectrem 2 or Proglaze 5. Two component coal tar extended, fuel resistant, polyurethane sealant, FS -SS -S -200(d) Type H; Shore A hardness of 10-35. Acceptable: Mameco International Vulkem 200 Pecora NR -300 6. One component silicone, mildew resistant, sealant, FS -TT -S-1543, Class A (Mildew resistant): Shore A hardness of 20-30. Acceptable: Dow Corning 786 Revised 6/27/18 Page 26 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS SECTION 07920 — SEALANTS AND CAULKINGS (Continued) PART 2 — PRODUCTS (Continued) 2.02 2.03 CAULKING 1. One component acrylic latex caulking, ASTM C834, with a minimum 75% recovery when tested in conformance with ASTM C736. Acceptable, or City approved equal: Pecora AC -20 Tremco Acrylcalk Sonneborn Sonolac Bostik Chem -Calk 600 2. One component acoustical caulking, non-drying, non -hardening, synthetic rubber. Acceptable: Pecora BA -98 ACCESSORIES A. PRIMER: No staining type, recommended by sealant manufacturer to suit application. (Note: Not all sealants require a primer. Consult with manufacturer to determine if primer is required for specific materials to be sealed.) B. JOINT CLEANER: Noncorrosive and nonstaining type, recommended by sealant manufacturer; compatible with joint forming materials. C. JOINT FILLER: Traffic type joints: Approximately 70 durometers solid neoprene, sized to fit joint widths and depths. 2. All other joints: Preformed polyethylene foam cord, closed cell sponge butyl cord, or urethane foam strips sized for 30% compression in joints, as recommended by sealant manufacturer, and which is compatible with the sealant. D. BOND BREAKER: Pressure sensitive tape recommended by sealant manufacturer to suit application. Revised 6/27/18 Page 27 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS SECTION 07920 — SEALANTS AND CAULKINGS (Continued) 3.01 INSPECTION A. Inspect substrate surface to ensure that no bond -breaker materials contaminate the surface to which the sealant is to adhere and to ensure that unsound substrates are repaired. Installation of sealant shall be evidence of acceptance of the substrate. B. Verify joint dimensions prior to installation of sealant to ensure that all dimensions are within tolerance established in the manufacturer's literature. Unacceptable variations shall be called to the attention of the CITY REPRESENTATIVE for resolution. 3.02 PREPARATION A. Clean, prepare, and size joints in conformance with manufacturer's instructions. Remove any loose materials and other foreign matter which might impair adhesion of sealant. B. Verify that joint shaping materials and release tapes are compatible with sealant. C. Examine joint dimensions and size materials to achieve required width/depth ratios. D. Use joint filler to achieve required joint depths, to allow sealants to perform properly. E. Use bond breaker at joints subject to movement where sealant contacts back of joint. F. Prime as required, protecting all adjacent exposed surfaces. 3.03 INSTALLATION A. Install backer rod using a blunt or round tool which will insure a uniform (1/8") depth without puncturing the material. B. Apply sealant in continuous beads, without open joints, voids or air pockets so as to provide a watertight and airtight seal for the entire joint length. Take all necessary steps to prevent three sided adhesions. Sealant depth shall be one half of joint width, with a minimum depth of 1/4", and a maximum of 2", unless otherwise required by manufacturer. C. TOOLING: Tool exposed surfaces of sealant to the profile shown or, if none is shown, tool slightly concave. Revised 6/27/18 Page 28 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS SECTION 2 — ATTACHMENTS Revised 6/27/18 Page 31 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS SECTION 07920 — SEALANTS AND CAULKINGS (Continued) PART 3 — EXECUTION (Continued) 3.04 CLEANING A. As work progresses, immediately remove sealant that may accidentally flow onto adjacent surfaces, using solvent and cleaners recommended by sealant manufacturer. B. At completion, carefully check and repair damaged joints. 3.05 SCHEDULE A. EXTERIOR AND INTERIOR SEALANTS: 1. Significant movement (+25% or -25% joint movement capability): Vertical or inclined joint such as panel, coping, control and expansion joints, precast planks, prestressed concrete joints: Sealant Reference #1, 3. 2. Minimal movement (+25% or -50% joint movement capability): Vertical or inclined joints such as perimeters of doors, windows, wall penetrations: Sealant Reference #1, 2, 3. 3. Paving (requiring fuel resistant sealants): Sealant Reference #5. B. GLAZING SEALANTS: 1. Structural: Sealant Reference #4. 2. Nonstructural: Sealant Reference #2, 3, 4. C. INTERIOR: 1. General interior, under door and window bucks: Sealant Reference #7. 2. Special: a. Toilet rooms: b. Exposed acoustical: Sealant Reference #7 C. Nonexposed acoustical: Sealant Reference #8 END OF SECTION 07920 Revised 6/27/18 Page 29 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS SECTION 07925 —WATER REPELLENT PART 1 - GENERAL 1.01 REQUIREMENTS A. Section includes: Pressure cleaning of concrete or masonry block and applying water repellent. 1.02 SUBMITTALS A. SUBMIT MANUFACTURER'S PRODUCT DATA. 1.03 PRODUCTS A. Provide Sonneborn White Roc 10 or City approved equal. 1.04 EXECUTION A. Pressure cleaning of concrete or masonry block to remove dirt, oils, salt residue, etc. B. As necessary replace any damaged caulking. C. Use conventional air sprayer to apply water repellent to dry surface. END OF SECTION 07925 Revised 6/27/18 Page 30 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS SECTION 3 - INSTRUCTIONS TO BIDDERS BIDDERS: TO INSURE ACCEPTANCE OF THE BID, THE FOLLOWING INSTRUCTIONS MUST BE ADHERED TO: This Request for Bid is to supply roofing maintenance and repairs to the City of Sunrise. After receipt of an offer and acceptance by the City Commission, commodities or services will be provided as an award letter notifying the Bidder of acceptance of their Bid by the City Commission specifying duration of the Contract with extension periods if any, and the method of ordering. 3.1 HOW TO SUBMIT A BID All bids must be submitted in sealed envelopes, delivered or mailed to Office of the City Clerk, Fourth Floor, City of Sunrise, 10770 West Oakland Park Blvd., Sunrise, Florida 33351. The bid number and bid title must be plainly marked on the outside of the envelope. It will be the sole responsibility of the Bidder to ensure that the bid reaches the office of the City Clerk on or before the opening time and date shown on the Invitation for Bid Cover (Page 1). No bids will be received, accepted, or considered after said time and date, unless the City, in its sole discretion reasonably exercised, elects to extend the time for submission and receipt of bids. Any request for an extension of time necessitated by an unforeseen emergency should be made prior to the Bid Opening and directed to the Purchasing Manager/Designee, City of Sunrise (954) 572-2274. FAXED BIDS WILL NOT BE ACCEPTED 3.2 THE BID PACKAGE The bid package consists of Specifications, Additional Requirements, Attachments, Instructions to the Bidders, Terms and General Conditions, and the following Schedules: Schedule "A" - Bid Sheet & Certification Schedule "B" - Non -Collusion Affidavit Schedule "C" - Bidder's Drug Free Statement Schedule "D" - Bidder's Qualification Statement Schedule "E" - Warranty Information Form (If Applicable) Schedule "F" - Insurance & License Requirements Schedule "G"- Statement of No Bid Section 6, "Bid Submission Package", and any other required documents must be returned in order for the bid to be considered for award. The Bidder should submit one (1) original — clearly marked as original - and two (2) photocopies (all collated and marked "Copy") of their bid. All Bids are subject to the conditions specified herein. All bids received will be read into the record and may be rejected for noncompliance to requirements after a full review by the Purchasing Division. 3.3 INQUIRIES. ADDENDA AND MODIFICATIONS The Bidder must direct any inquiries on the specifications, additional requirements, attachments, terms and general conditions or instructions, in writing, either via U.S. Mail, Email or Fax, to the individual named on Page 1 at the Purchasing Division, City of Sunrise, 10770 West Oakland Park Blvd, Sunrise, Florida, 33351, Fax No. (954) 578-4809. All inquiries must be received by the Purchasing Division no later than 12:00 p.m. ten (10) calendar days prior to the Bid opening. Revised 6/27/18 Page 32 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS Any addenda or other modifications to the Documents will be made in writing, and issued by the City, prior to the time and date of Bid Opening. Such written addenda or modifications shall be part of the Documents and shall be binding upon each Bidder. No verbal addenda or modifications shall be allowed nor shall any Bidder rely upon any verbal addenda or modifications in preparing or submitting its bid. 3.4 EXECUTION OF BID Bid must contain an original signature of an authorized representative of the company in the space provided. Failure to sign the bid shall invalidate it, and it will not be accepted. All bids must be completed in ink or typewritten. No erasures are permitted. If a correction is necessary, the bidder should draw a single line through the entered figure and enter the corrected figure above it. Corrections should be initialed by the person signing the bid, or a duly authorized representative of the firm submitting bid. Any illegible entries, pencil bids or corrections not initialed may not be accepted. Only corrections that show the clear intent of the bidder, in the sole discretion of the City of Sunrise, will be accepted. 3.5 NO BID If not submitting a bid, respond by returning the "STATEMENT OF NO BID" Schedule G of this Invitation for Bid. Repeated failure to respond without sufficient justification may be cause from removal of a Bidder's name from future solicitations. 3.6 PRE-BID CONFERENCE Not applicable for this bid. 3.7 PRICES BID List both the unit price and the extended total, if applicable. Prices must be stated in the units specified on the Bid Sheet. In case of a discrepancy in computing the amount of the bid between the unit price bid and the extended total, the unit price will govern. When bids are awarded on the basis of Lump Sum, if there is a discrepancy between the written and numeric amount, the written amount prevails. 3.8 F.O.B. POINT All bid prices shall be F.O.B. destination freight prepaid and delivered by Vendor to the City's specified location(s). 3.9 BID VALIDITY All bids shall remain valid for ninety (90) days after the time of bid opening. After this time period the Bidder may request the Bid be withdrawn. 3.10 DELIVERY / COMPLETION TIME / RESPONSE TIME Work shall commence within 30 calendar days of the date of Notice to Proceed or after receipt of purchase order. If specified response time cannot be met, show number of days required to respond after receipt of Purchase Order or release order in space provided on the Bid Sheet. Response time may become a basis for making an award. Response shall be within the normal working hours of the user, Monday through Friday, excluding City holidays The delivery of the goods and /or services within the time specified is of the essence in this procurement. The City shall have the right to cancel any or all items(s) without obligation if Revised 6/27/18 Page 33 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS delivery is not made on or before the time(s) specified. In the event Vendor fails to make timely delivery, City shall have the right to purchase elsewhere and unless they delay was caused by unforeseen circumstances beyond Vendor's control, Vendor shall reimburse City for any additional charges incurred. On-Call/Emergency Services Contractor shall be available for emergency call and respond on site within two (2) hours after being notified by the City of Sunrise, 24 hours a day, 7 days per week, including holidays. Normal working hours are Monday - Friday - 8:00 a.m. to 5:00 p.m. (excluding City holidays). Any work performed outside the normal working hours or on Contractor's recognized holidays will be billed at an overtime up charge. This up charge will be added as a percentage increase to the contracted rate in the bid for all such overtime work. If an unreasonable or excessive percentage rate is provided on this up charge contingency item, the bid will be subject to a determination of being unbalanced and will subject the complete bid to rejection as deemed in the best interest of the City as determined by the Purchasing Division. Contractor should attach with the bid a list of all holidays for which an over -time up charge will be applied. Special Provisions The Contractor may be required to respond to on-call/emergency services at multiple facilities at any one time and, as such, should be adequately staffed to respond to at least three (3) requested locations in a timely manner. Contractor's employee(s) shall be required to carry photo identification at all times identifying such person(s) as an authorized employee of the Contractor. Contractor's employees shall exhibit a professional behavior at all times on City property. Contractor's employee(s) shall be solely responsible for safeguarding of tools, materials and equipment brought into any facility. The Contractor's employee will be required to verify possession of all tools before entering and departing the facility. Debris caused by work under this Contract shall be cleaned up and properly disposed of by the Contractor prior to leaving the premises. The awarded Contractor shall comply with all current mandates of OSHA, NFPA, NEC 2005, Florida Building Codes, UL listings, all local building codes and any other required laws, codes, standards, safety that would apply to any required work. 3.11 SAMPLES Not applicable to this bid. 3.12 WARRANTIES / GUARANTEES Vendor warrants that the materials, goods, services and/or workmanship furnished and/or delivered pursuant to the Purchase Order shall: Conform in all respects to the description, drawings and specifications contained in this Bid Revised 6/27/18 Page 34 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS Be merchantable and fit for the ordinary purpose for which such goods are used or intended to be used Be new and unused, of good quality and free from defects whether latent or patent in material or workmanship Be free from any security interests, liens or encumbrances. Vendor warrants that it has good and marketable title to the goods delivered There is no infringement upon or violation of any copyrights or patent rights Minimum warranty shall be two (2) years to include labor, materials, equipment and the standard manufacturer's warranty on material. The Bidder shall furnish with the bid all pertinent warranty data as it relates to the items bid upon. If requested, the Bidder is to complete Schedule "E". 3.13 ESTIMATED QUANTITIES Not applicable to this bid. 3.14 ADDITIONAL QUANTITIES/BALANCE OF LINE Not applicable to this bid. 3.15 COMPLIANCE WITH LAWS The Bidder and the Services must comply with all applicable federal, state, and local laws, codes, ordinances, rules, and regulations including, without limitation, American with Disabilities Act, 42 U.S.C. § 12101, Section 504 of the Rehabilitation Act of 1973, and any related federal, state, or local laws, rules, and regulations. Lack of knowledge on the part of the Bidder shall in no way relieve them from responsibility. The Bidder shall comply with all laws, ordinances and governmental rules, regulations and orders now or at any time during the term of this Contract. Bidder agrees to provide to the City all necessary certifications required by any federal, state, and local laws, ordinances, codes, rules and regulations. The Bidder's obligations under this section shall survive termination, cancellation or expiration of this Contract. 3.16 BRAND NAMES /APPROVED EQUALS Not applicable to this bid. 3.17 PAST PROBLEMS ON PRIOR CONTRACTS / LITIGATION The Bidder shall disclose any pending or anticipated litigation between the Bidder and any other party or parties that might affect the performance of this Contract. Such litigation must be indicated on Schedule D. When the Bidder or a proposed sub -Contractor has previously worked for the City and has received complaints from the City or has been involved in disputes with the City about the work, the Bidder should submit with their bid an explanation of what, if anything, the Bidder has done or will do to avoid similar problems in the future. This explanation must deal specifically with the problems involved on the prior Contract and any organizational, operational or other changes which have been or will be implemented. If, in the sole judgment of the City, the Bidder has failed to provide an adequate plan to ensure that the Contractual dispute previously experienced by the City will not recur, the City reserves the right to reject the bid submitted by that Bidder. Revised 6/27/18 Page 35 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS 3.18 BASIS OF AWARD The City reserves the right to reject any and all bids, to waive any irregularity in bids received, to accept any item or group of items, unless qualified by the Bidder. The City reserves the right before recommending any award to inspect the Bidders' facilities or take any other action necessary to determine a Bidder's ability to perform in accordance with the specification, terms and conditions of the Invitation for Bid. Award will be made on a Total Bid basis to the lowest responsive and responsible Bidder. In the event no Bidder bids all items, the City may award on an item by item basis. In the event the successful bid is terminated or cancelled for any reason, the City reserves the right to make an award to the next lowest responsive and responsible Bidder, or re -bid the entire Contract or any part thereof, whichever is in the best interest of the City. 3.19 COST LIABILITY The Bidder shall bear all costs associated with submitting the Bid, including preparation, site visitation or any travel connected with submittal of the Bid. 3.20 CONTENTS OF BID / PUBLIC RECORDS Any material submitted in response to this Bid will become a public record pursuant to Chapter 119, Florida Statutes. No claim of confidentiality or trade secret will be honored unless a specific exemption from the public records law exists and the Florida or Federal statute identifying the exemption is identified in the Bid. An incorrectly claimed exemption does not disqualify the firm, only the exemption claimed. 3.21 INVESTIGATIONS OF CONDITIONS AFFECTING OPERATIONS Before submitting a Bid, each Bidder shall make all investigations and examinations necessary to ascertain conditions and requirements of the Bid. Failure to make investigations and examinations shall not relieve the successful Bidder from the obligation to comply in every detail with all provisions and requirements of the Bid nor shall it be a basis for any claim whatsoever for alteration in any term of or payment required by the Purchase Order or any subsequent Contract. 3.22 CONE OF SILENCE This solicitation falls under the City of Sunrise's Code of Ordinances Section 2-1 (n) known as the "Cone of Silence". After a Bid is opened or a Short List is established, a vendor or a vendor's representative as defined in the Ordinance, a proposer, service provider, consultant or lobbyist, may not seek information or clarification or in any way contact any Official or employee of the City concerning this solicitation with the exception of the City Attorney, the Purchasing Director or an individual specifically designated in this document for dissemination of information. A copy of any written communication concerning this solicitation shall be filed with the Purchasing Division and shall be made available to the public upon request. A violation of the "Cone of Silence" renders any award voidable at the sole discretion of the City Commission and may subject the potential vendor or vendor's representative to debarment in accordance with the City's Code of Ordinances. Nothing in the Ordinance prevents a vendor or vendor's representative from taking part in a public meeting concerning the solicitation. Revised 6/27/18 Page 36 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS SECTION 4 - TERMS AND GENERAL CONDITIONS 4.1 INDEMNIFICATION To the fullest extent permitted by law, the Contractor agrees to indemnify, defend and hold harmless the City of Sunrise, its officers, agents, volunteers, and employees from and against all claims, damages, losses, and expenses, including but not limited to attorneys' fees, court costs, or other alternative dispute resolution costs arising out of or resulting from the performance of Services under this Contract (1) provided that any such claims, damages, losses or expenses are attributable to bodily injury, sickness, disease, death, or personal injury, or property damage, and (2) are caused in whole or in part by the negligent acts, errors, or omissions of the Contractor, Contractor's subcontractor(s), or anyone directly or indirectly employed or hired by Contractor or anyone for whose acts Contractor may be liable, REGARDLESS OF WHETHER OR NOT CAUSED IN PART BY CITY OF SUNRISE, ITS OFFICERS, AGENTS, VOLUNTEERS, OR EMPLOYEES. The City of Sunrise reserves the right, but not the obligation, to participate in the defense without relieving Contractor of any obligation hereunder. Contractor agrees this indemnity obligation shall survive the expiration or earlier termination of the Contract. 4.2 INSURANCE REQUIREMENTS Contractor agrees at its sole expense to maintain on a primary basis, non-contributory basis during the life of this Contract the following insurance coverages, limits, including endorsements described herein. The requirements contained herein, as well as City's review or acceptance of insurance maintained by Contractor is not intended to and shall not in any manner limit or qualify the liabilities or obligations assumed by Contractor under the Contract. Any coverage maintained by the City shall apply excess of, or contingent upon the absence of, insurance required or maintained by Contractor. Commercial General Liability. Contractor agrees to maintain Commercial General Liability at a limit of liability not less than $1,000,000.00 Each Occurrence, $2,000,000 Annual Aggregate. Contractor agrees its coverage shall not contain any restrictive endorsement(s) excluding or limiting Product/Completed Operations, Independent Contractors, Broad Form Property Damage, X -C -U Coverage, Contractual Liability or Separation of Insureds. Additional Insured Endorsement. Contractor agrees to endorse the City as an Additional Insured on the Commercial General Liability with the following, or similar endorsement providing equal or broader Additional Insured coverage, the CG 20 26 07 04, or CG 20 26 04 13, Additional Insured — Designated Person or Organization endorsement; or the CG 20 10 07 04, or CG 20 10 04 13, Additional Insured — Owners, Lessees, or Contractors endorsement, including the additional endorsement of GC 20 37 07 04, or GC 20 04 13, Additional Insured — Owners, Lessees, or Contractors Completed Operations. The name of the organization endorsed as Additional Insured for all endorsements shall read "City of Sunrise". Business Automobile Liability. Contractor agrees to maintain Business Automobile Liability, including the MCS -90 Motor Carrier Act Endorsement and/or CA 99 48 Pollution Liability - Broadened Coverage For Covered Autos - Business Auto, Motor Carrier and Truckers Coverage Forms Endorsement, at a minimum limit not less than $1,000,000 per occurrence providing coverage for damages against such third -party liability, remediation and defense costs. In the event the policy includes a self-insured retention or deductible in excess of $25,000, the City reserves the right, but not the obligation, to review the Contractor's most recent annual report or audited financial statements. The Contractor agrees the policy shall be endorsed to include City as Additional Insured under CA 2048 Designated Insured Revised 6/27/18 Page 37 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS Endorsement, or its equivalent. Pollution Legal and Remediation Liability. Contractor agrees to maintain Third -Party Pollution Legal and Remediation Liability at a limit of liability not less than $1,000,000 Each Occurrence $2,000,000 Annual Aggregate. The Contractor agrees the policy shall include a minimum three (3) year discovery (tail) reporting period, and a retroactive date that equals or precedes the effective date of the Contract, or the performance of Work hereunder. In the event the policy is cancelled, non -renewed, switched to an occurrence form, retroactive date advanced, or any other event triggering the right to purchase a supplemental extended reporting period (SERP) during the life of this Contractor, Contractor agrees to purchase a SERP with a minimum reoortina period not less than two (2) vears. The reauirement to tractor of the obli ion shall coverage may be provided on a Per -Project Basis. The Third -Party Pollution Legal and Remediation Liability shall be endorsed to include City as an Additional Insured. Worker's Compensation Insurance & Employers Liability. Contractor agrees to maintain Worker's Compensation Insurance & Employers Liability in accordance with Florida Statutes Chapter 440. Waiver of Subrogation. Contractor agrees by entering into this Contract to a Waiver of Subrogation for each required policy herein. When required by the insurer, or should a policy condition not permit Contractor to enter into a pre -loss agreement to waive subrogation without an endorsement, then Contractor agrees to notify the insurer and request the policy be endorsed with a Waiver of Transfer of Rights of Recovery Against Others, or its equivalent. This Waiver of Subrogation requirement shall not apply to any policy, which includes a condition specifically prohibiting such an endorsement, or voids coverage should Contractor enter into such an agreement on a pre -loss basis. Certificate(s) of Insurance. Contractor agrees to provide City a Certificate of Insurance evidencing that all coverages, limits and endorsements required herein are maintained and in full force and effect, and Certificates of Insurance shall provide a minimum thirty (30) day endeavor to notify, when a manuscript notice endorsement is available by Contractor's insurer. If the Contractor receives a non -renewal or cancellation notice from an insurance carrier affording coverage required herein, or receives notice that coverage no longer complies with the insurance requirements herein, Contractor agrees to notify the City by fax or email within five (5) business days with a copy of the non -renewal or cancellation notice, or written specifics as to which coverage is no longer in compliance. The Certificate Holder(s) address shall read: Original to: City of Sunrise Attn: Procurement Manager Purchasing Office 10770 West Oakland Park Blvd. Sunrise, Florida 33351 purchasing(a.sunrisefl.gov Fax (954) 752-2278 Copy to: City of Sunrise Attn: Risk Manager Office Risk Management Division 10770 W. Oakland Park Blvd. Sunrise, FL 33351 riskmanagement(c�sunrisefl.gov Revised 6/27/18 Page 38 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS Umbrella or Excess Liability. Contractor agrees to maintain either a Commercial Umbrella or Excess Liability at a limit of liability not less than $1,000,000 Each Occurrence $2,000,000 Aggregate. The Contractor agrees to endorse the City as an "Additional Insured" on the Commercial Umbrella/Excess Liability, unless the Certificate of Insurance states the Commercial Umbrella/Excess Liability provides coverage on a pure/true follow -form basis, or the City is automatically defined as an Additional Protected Person. Right to Revise or Refect. City reserves the right, but not the obligation, to revise any insurance requirement, not limited to limits, coverages and endorsements, or to reject any insurance policies which fail to meet the criteria stated herein. Additionally, City reserves the right, but not the obligation, to review and reject any insurer providing coverage due to its poor financial condition or failure to operate legally. 4.3 PATENTS AND ROYALTIES The Bidder, without exception, shall indemnify and save harmless the City of Sunrise and its employees from liability of any kind including cost and expenses for or on account of any copyrighted, patented or unpatented invention, process or article of manufacture lot any article used in the performance of the Contract, including its use by the Purchaser. If the Bidder uses any design, device or materials covered by letters, patent or copyright, it is mutually agreed. And understood without exception that the bid prices shall include all royalties or cost arising from the use of such design, device or materials in any way involved in the work. 4.4 INITIAL CONTRACT PERIOD AND CONTRACT RENEWAL The initial contract period shall be for three (3) years, commencing on the date of award. In addition, the City reserves the right to renew the contract for three (3) additional one (1) year periods, providing all terms conditions and specifications remain the same, both parties agree to the extension, and such extension is approved by the City, contingent upon budget approval. 4.5 CONTRACT CONTINUITY / TRANSITIONAL PERIOD In the event the services are scheduled to end either by Contract expiration or by termination by the City of Sunrise (at the City's discretion), the Bidder shall continue the services, if requested by the City, until new services can be completely operational. At no time shall this transitional period extend more than one hundred eighty (180) days beyond the expiration date of the existing Contract. The Bidder will be reimbursed for this service at the rate in effect when this transitional period clause is invoked by the City. 4.6 CONTRACTS OVERLAPPING FISCAL YEARS: The City's fiscal year begins October 1 and ends September 30 of the following calendar year. When a Contract's terms extends beyond the fiscal year in which the Contract commences, the City will issue a new Purchase Order to cover its needs for the balance of the fiscal year and a new purchase order will be issued to correspond with the remaining months of the Contract that extends into the next fiscal year. Issuance of a new Purchase Order shall be subject to the availability of budgeted funds. 4.7 TERMINATION FOR GOVERNMENTAL NON -APPROPRIATIONS City is a bona fide governmental entity of the State of Florida with City's fiscal year ending on September 30 of each calendar year. If City does not appropriate sufficient funds to purchase the quantities required under this Agreement for any of the City's fiscal years subsequent to the one in which the Agreement is executed and entered into, then this Revised 6/27/18 Page 39 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS Agreement shall be terminated effective upon expiration of the fiscal year in which sufficient funds to continue satisfaction of City's obligation under this Agreement were last appropriated by City and City shall not, in this sole event be obligated to make any further purchases beyond said fiscal year. 4.8 TERMINATION FOR CAUSE This Agreement may be terminated by either party upon three (3) calendar days written notice to the other party, should such other party fail substantially to perform in accordance with its material terms through no fault of the party initiating the termination. In the event the Contractor abandons this Agreement or causes it to be terminated by the CITY, the Contractor shall indemnify the CITY against any loss pertaining to this termination. In the event that the Contractor is terminated by the CITY for cause and it is subsequently determined by a court of competent jurisdiction that such termination was without cause, such termination shall thereupon be deemed a termination for convenience under Section 4.9 and the provisions of Section 4.9 shall govern. 4.9 TERMINATION FOR CONVENIENCE A Contract resulting from this Bid may be terminated by the City without cause upon thirty (30) days written notice to the Vendor. In the event of such a termination without cause, the Vendor shall be compensated for all services performed to the City's satisfaction, together with reimbursable expenses incurred. In such event, the Vendor shall promptly submit to the City its invoice for final payment and reimbursement under the terms of this Contract. 4.10 TERMS RELATING TO PRICE Unless otherwise noted by the City, all prices shall be firm through the period of the Contract or purchase order and shall not be subject to increase. In the event of a manufacturer's or Vendor's price decrease during the Contract period, the City shall receive the full benefit of such price reduction on any undelivered goods or services on an existing purchase order and on any subsequent order placed during the Contract period. The Director of Purchasing must be notified in writing of any price reduction within five (5) days of the effective date. Failure to report price reductions may result in cancellation of Contract for cause, pursuant to these Terms and Conditions. In the event of a manufacturer's price increase during the Contract period, the Vendor shall submit proof from the manufacturer of said increase, and the City may accept the price increase at the time of Contract renewal, or terminate or re -bid the Contract, in whole, or in part, whichever is in the best interest of the City. The cost of all services as bid herein shall remain firm for the first year of the Contract. Costs for subsequent years and any extension term years shall be subject to an adjustment only if increases occur in the industry. However, unless very unusual and significant changes have occurred in the industry, such increases shall not exceed 5% per year or, the latest yearly percentage increase in the All Urban Consumers Price Index (CPI -U) (National) as published by the Bureau of Labor Statistics, U.S. Dept of Labor whichever is less. The yearly increase, or decrease in the CPI shall be that latest index published and available ninety (90) days prior to the end of the Contract year then in effect compared to the index for the same month one year prior. Any requested cost increase shall be fully documented and submitted to the City at least sixty (60) days prior to the Contract anniversary date. Any approved cost adjustments shall become effective upon the anniversary date of the Contract. In the event the CPI or industry costs decline, the City Revised 6/27/18 Page 40 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS shall have the right to receive, from the Vendor, a reasonable reduction in costs that reflect such cost changes in the industry. The City may, after examination, refuse to accept the adjusted costs if they are not properly documented, increases are considered to be excessive, or decreases are considered to be insufficient. In the event the City does not wish to accept the adjusted costs and the matter cannot be resolved to the satisfaction of the City, the Contract may be cancelled by the City upon giving thirty (30) days written notice to the Vendor. 4.11 SELLING, TRANSFERRING OR ASSIGNING RESPONSIBILITIES The Vendor shall not sell, transfer or assign the performance required by this bid without the prior written consent of the City. Any Award issued pursuant to this bid and the monies which may become due hereunder are not assignable, unless the prior written approval of the City is obtained. 4.12 PAYMENT/BILLING INSTRUCTIONS Payment will be made by the City after the items or services awarded have been, received, inspected, found to comply with award specifications, are free of damage or defect and are properly invoiced. Invoices, unless otherwise indicated, must show Purchase Order Number and shall be submitted in duplicate to: CITY OF SUNRISE Finance Department 10770 West Oakland Park Blvd. Sunrise, FL 33351 Payment will be made within 30 days after delivery, authorized inspection and acceptance. The City is exempt from Federal and State Taxes for tangible personal property. The City will provide an exemption certificate to the Vendor upon request. The Vendor is not exempt from paying sales tax to the suppliers for materials to fulfill Contractual obligations with the City, nor is Vendor authorized to use the City's tax exemption Number in securing such materials. 4.13 COMPLIANCE WITH STATE OF FLORIDA CRIME ENTITY Please be informed that pursuant to Section 287.133(2) (a), Florida Statutes, "A person or affiliate who has been placed on the convicted Bidder list following a conviction for a public entity crime may not submit a bid or Bid on a Contract to provide any goods or services to the City, may not submit a bid on a Contract with the City for the construction or repair of a public building or public work, may not submit bids on leases of real property to the City, may not be awarded or perform work as a Bidder, supplier, sub -Bidder, or consultant under a Contract with the City, and may not transact business with the City in excess of the threshold amount provided in S.287.017 for CATEGORY TWO for a period of thirty-six (36) months from the date of being placed on the convicted Bidder list." The submission of a bid shall constitute an affirmative representation of the Bidder to the City that the Bidder is aware of the Statute and in full compliance thereof. Revised 6/27/18 Page 41 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS 4.14 COMPLIANCE WITH OCCUPATIONAL SAFETY AND HEALTH ACT If applicable, Vendor certifies that all material, equipment, etc. contained in the bid meets all O.S.H.A. requirements. Bidder further certifies that if he/she is the successful Bidder, and the material, equipment, etc., delivered is subsequently found to be deficient in any O.S.H.A. requirement in effect on date of delivery, all costs necessary to bring the material, equipment, etc., into compliance with the aforementioned requirements shall be borne by Vendor. 4.15 SAFETY DATA SHEETS (SDS) In compliance with federal standards and regulations listed under OSHA 29 CFR 1910.1200 Hazard Communication Standard with adopted Globally Harmonized System of Classification and Labeling of Chemicals when applicable, any item delivered from a Contract resulting from this bid must be accompanied by a Safety Data Sheet (SDS), if applicable. The SDS must contain the following information: 1. Product identifier used on the label and any other common names or synonyms by which the substance is known. 2. Hazard Identification and the appropriate warning information associated with those hazards. 3. Composition/Information on Ingredients in the product. 4. First -Aid Measures for initial care to individuals who have been exposed to the chemical. 5. Fire -Fighting Measures for fighting a fire caused by the chemical. 6. Accidental Release Measures with recommendations on appropriate spill, leak, or release response. 7. Handling and Storage for safe practice and conditions. 8. Exposure Controls/Personal Protection indicating exposure limits, engineering controls, and personal protective measures that can be used to minimize worker exposure. 9. Physical and Chemical Properties of the substance or mixture. 10. Stability and Reactivity information of the chemical. 11. Toxicological Information identifying health effects and toxicology of the chemical. 4.16 STORAGE, REMOVAL AND DISPOSAL OF SOLID WASTE/ CONSTRUCTION DEBRIS: The Bidder must comply with Section 12-11 of the City Code, which reads as follows: "All solid waste on construction sites shall be contained on site and shall be secured as provided in Section 12-5 (bagged, bundled or stored in a container) while awaiting removal and disposal. Only containers ("dumpsters" or "roll offs") for solid waste may be used, borrowed, or rented which are obtained from, or are the property of a City -franchised solid waste hauler and the name of the owner shall be clearly indicated on such containers. Only solid waste haulers that possess a franchise from the City may remove and dispose of solid waste, construction debris or recyclables from within the City." 4.17 NO DAMAGES FOR DELAY The CONTRACTOR shall not be entitled to any claim for damages including, but not limited to, loss of profits, loss of use, home office overhead expenses, equipment rental and similar costs, on account of delays in the progress of the Project from any cause whatsoever including an act or neglect of the CITY, adverse weather conditions, and act of God, strike, war or national disaster or emergency, unusual delay in deliveries, unusual delay in procuring permits, differing site conditions, unavoidable casualties or other causes beyond the CONTRACTOR'S control, or by delay authorized by the CITY, or by other causes which the CONTRACTOR Revised 6/27/18 Page 42 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS determines may justify delay. The CONTRACTOR'S sole recovery and sole remedy for any such delay shall be a reasonable extension of time and a revision to the Project Schedule as determined by the CITY. However, additional costs to the CONTRACTOR or delays in the CONTRACTOR'S performance caused by improperly timed activities shall not be the basis for granting a time extension. If the CONTRACTOR wishes to make a claim for an increase in time of performance, written notice of such claim shall be made to the CITY within ten (10) working days after the occurrence of the event, or the first appearance of the condition giving rise to such claim. The CITY'S representative shall determine whether or not the CONTRACTOR is entitled to a time extension for the delay. The failure of the CONTRACTOR to give such notice shall constitute a waiver of any claim under this section. 4.18 GOVERNING LAW AND VENUE The Agreement shall be governed by the laws of the State of Florida. Except as set forth in the indemnification section of the Agreement should the Parties be involved in legal action arising under, or connected to this Agreement, each party will be responsible for their own attorneys' fees and costs. The venue for any litigation will be Broward County, Florida. Both Parties hereby agree to waive a jury trial, and will proceed to a trial by judge if necessary. 4.19 DISCRIMINATORY VENDOR LIST Pursuant to Section 287.134, Florida Statutes, an entity or affiliate who has been placed on the discriminatory vendor list may not submit a bid, proposal, or reply on a contract to provide any goods or services to a public entity; may not submit a bid, proposal, or reply on a contract with a public entity for the construction or repair of a public building or public work; may not submit bids, proposals, or replies on leases of real property to a public entity; may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with any public entity; and may not transact business with any public entity. By execution of this Addendum to Agreement, Contractor represents that it has not been placed on the discriminatory vendor list as provided in Section 287.134, Florida Statutes. 4.20 SCRUTINIZED COMPANY Pursuant to Section 287.135, Florida Statutes, Contractor certifies that it is not on the Scrutinized Companies that Boycott Israel List created pursuant to Section 215.4725, Florida Statutes and that it is not engaged in a boycott of Israel. Pursuant to Section 287.135, in the event the Contract is for one million dollars or more, Contractor certifies that it is not on the Scrutinized Companies with Activities in Sudan List or the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List created pursuant to Section 215.473, Florida Statutes; and Contractor further certifies that it is not engaged in business operations in Cuba or Syria. Pursuant to Section 287.135, Florida Statutes, City may, at the option of the City Commission, terminate this Contract if Contractor is found to have submitted a false certification as provided under subsection 287.135(5), Florida Statutes; has been placed on the Scrutinized Companies that Boycott Israel List, or is engaged in a boycott of Israel; has been placed on the Scrutinized Companies with Activities in Sudan List or the Scrutinized Companies with Activities in the Iran Petroleum Energy Sector List; or has been engaged in business operations in Cuba or Syria. Revised 6/27/18 Page 43 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS 4.21 PUBLIC RECORDS LAW The CONTRACTOR shall comply with all applicable requirements contained in the Florida Public Records Law (Chapter 119, Florida Statutes), including but not limited to any applicable provisions in Section 119.0701, Florida Statutes. To the extent that the CONTRACTOR and this Agreement are subject to the requirements in Section 119.0701, Florida Statutes, the CONTRACTOR shall: (a) keep and maintain public records required by the City to perform the services provided hereunder; (b) upon request from the City's custodian of public records, provide the City with a copy of the requested records or allow public records to be inspected or copied within a reasonable time at a cost that does not exceed the cost provided in Chapter 119, Florida Statutes, or as otherwise provided by law; (c) ensure that public records that are exempt or confidential and exempt from public records disclosure requirements are not disclosed, except as authorized by law for the duration of the term of this Agreement and following completion of this Agreement if the CONTRACTOR does not transfer the records to the City; and (d) upon completion of the Agreement, transfer, at no cost, to the City all public records in the possession of the CONTRACTOR or keep and maintain public records required by the City to perform the service. If the CONTRACTOR transfers all public records to the City upon completion of the Agreement, the CONTRACTOR shall destroy any duplicate public records that are exempt or confidential and exempt from public records disclosure requirements. If the CONTRACTOR keeps and maintains public records upon completion of the Agreement, the CONTRACTOR shall meet all applicable requirements for retaining public records. All records stored electronically must be provided to the City, upon request from the City's custodian of public records, in a format that is compatible with the information technology systems of the City. If the CONTRACTOR fails to comply with the requirements in this Section 4.19, the City may enforce these provisions in accordance with the terms of this Agreement. If the CONTRACTOR fails to provide the public records to the City within a reasonable time, it may be subject to penalties under Section 119. 10, Florida Statutes. IF THE CONTRACTOR HAS QUESTIONS REGARDING THE APPLICATION OF CHAPTER 119, FLORIDA STATUTES, TO THE CONTRACTOR'S DUTY TO PROVIDE PUBLIC RECORDS RELATING TO THIS AGREEMENT, THE CONTRACTOR SHOULD CONTACT THE CITY'S CUSTODIAN OF PUBLIC RECORDS: THE CITY CLERK, FELICIA M. BRAVO, BY TELEPHONE (954/746-3333), e- mail (CityClerk(&-sunrisefl.gov), or mail (City of Sunrise, Office of the City Clerk, 10770 West Oakland Park Boulevard, Sunrise, Florida 33351). 4.22 NONDISCRIMINATION The Contractor warrants and represents that all of its employees are treated equally during employment without regard to race, color, national origin, sex, gender identity, sexual orientation, age, disability/handicap, religion, family or income status. Revised 6/27/18 Page 44 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS 4.23 ELECTRONIC RECORD KEEPING Bidder certifies their services and products meet all recordkeeping requirements of the State of Florida, including but not limited to those in Chapter 119, Florida Statutes and Rule 1 B - 26.003(6)(g), Florida Administrative Code. 4.24 COMPLIANCE WITH LAWS Bidder and the Services must comply with all applicable federal, state, and local laws, codes, ordinances, rules, and regulations including, without limitation, American with Disabilities Act, 42 U.S.C. § 12101, Section 504 of the Rehabilitation Act of 1973, and any related federal, state, or local laws, rules, and regulations. Revised 6/27/18 Page 45 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS SECTION 5 - BID SUBMISSION CHECK LIST COMPANY NAME: (Please Print): Phone: Fax: BEFORE SUBMITTING YOUR BID, MAKE SURE YOU... 1. Carefully read the SPECIFICATIONS. 2. Properly fill out the BID SHEET and CERTIFICATION PAGE (Schedule "A"). 3. Fill out and sign the NON -COLLUSION AFFIDAVIT (Schedule "B") and have it properly notarized. 4. Sign the VENDOR DRUG FREE STATEMENT (Schedule "C"). 5. Fill out the VENDOR QUALIFICATION STATEMENT (Schedule "D"), if required. 6. Include WARRANTY INFORMATION FORM AND EXHIBITS (Schedule "E"), if required. 7. CHECK THE INSURANCE and LICENSE requirements to be sure you comply, and submit PROOF of INSURANCES or LICENSES, if required, with your Bid (Schedule "F"). 8. Complete STATEMENT OF NO BID (Schedule "G"), if applicable. 9. Clearly mark the BID NUMBER AND BID NAME on the outside of your envelope. 10. Submit one (1) original (marked "Original") and two (2) photocopies (all collated and marked "Copy") of bid; Two (2) electronic true and exact copies of the bid on CD, flash drive or DVD in .pdf format. 11. Include a Bid Bond, if applicable. 12. Make sure your BID is submitted prior to the deadline. Late Bids will not be accepted. FAILURE TO PROVIDE THE REQUESTED SCHEDULES MAY RESULT IN YOUR BID BEING DEEMED NON-RESPONSIVE. THIS PAGE AND THE FOLLOWING PAGES ARE TO BE RETURNED WITH YOUR BID. THIS SHOULD BE THE FIRST PAGE OF YOUR BID. Revised 6/27/18 Page 46 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS SECTION 6 — BID SUBMISSION PACKAGE SCHEDULE "A" CITY OF SUNRISE BID SHEET & CERTIFICATION ALL BIDS SHALL REMAIN VALID FOR NINETY (90) DAYS AFTER BID OPENING The undersigned bidder agrees to furnish all labor,'tools, material and supplies, and to sustain all the expense incurred in doing the work set forth below that may be awarded the undersigned by the City of Sunrise, Florida, through its proper officers, and to do the same strictly in accordance with the plans and contract documents on file in the Office of the City Engineer of Sunrise, which are referred to below and made a part hereof, at the following unit prices, to -wit: The following unit prices are associated with roofing, re -roofing and roof repair components. Please be comprehensive in filling out the items involved below. Two (2) or Three (3) levels of work scope are indicated for most of the Proposal items. Small repair jobs from 0 to 500 square feet (S.F.), medium size roofing jobs 501 to 10,000 S.F., and large roofing jobs over 10,001 S.F. An approximate quantity is also provided and the "unit price" and total blanks to be completed by Bidder. All proposal line items shall include maintenance, insurance, overhead, and other fixed costs. Please complete the following: Base bid shall include: ROOF MANUFACTURER'S NAME: ROOF BRAND NAME: INSULATION MANUFACTURER'S NAME: INSULATION NAME: ROOFING SYSTEM WARRANTY & PERIOD: Revised 6/27/18 Page 47 BID TITLE: BID 19 -17 -12 -HR ITEM 1: BID NUMBER: ROOFING MAINTENANCE & REPAIRS A) Prior to Contractor beginning any other work at the site, Contractor shall remove the asbestos containing material using a licensed asbestos abatement Contractor. Removal shall be in accordance with the asbestos test laboratory survey report recommendations provided by the City. This allowance is to reimburse the Contractor for the actual cost incurred from asbestos abatement and it does not include any incidental costs. The proposed cost for asbestos abatement shall be approved prior to performing the work. A copy of the receipt is required for payment. ALLOWANCE B) ALLOWANCE for Permits. Contractor markup and overhead is disallowed. Payment shall be based on actual bona fide receipts. ALLOWANCE ITEM 2: Furnish all materials, labor, and equipment for existing roof tear - off, including existing insulation board, down to substrate. This item also includes all disposal costs. $ 20,000.00 TOTAL $ 10,000.00 TOTAL a) Small Roof Repair Areas: 0 S.F. - 500 S.F. Approximately: 121 Locations = 500 S.F@ $ /S. F. _ $ b) Medium Roof Repair/Replacement areas. 501 S.F. - 10,000 S.F. Approximately. (2) Locations = 7,500 SY @ $ /S. F. _$ c) Large Roof Repair/Replacement Areas: Over 10,001 S.F. Approximately: f:L Locations = 25, 000 S.F @ $ /S. F. ITEM 3: Furnish all materials, labor, and equipment to install approved isotherm or polyisocyanurate rigid insulation board tapered, based on 1 %2 inches thickness, fully attached to substrate. A) Mopped in: a) Small Roof Repair Areas: 0 S.F. - 500 S.F. Approximately: (2) Locations = 500 S.F(& $ /S. F. _ $ b) Medium Roof Repair/Replacement areas. 501 S.F. -10,000 S.F. Approximately: (2) Locations = 7,500 SY @ $ /S. F. _$ TOTAL TOTAL TOTAL TOTAL TOTAL Revised 6/27/18 Page 48 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS c) Large Roof Repair/Replacement Areas: Over 10,001 S.F. Approximately: (3) Locations = 25, 000 SY @ $ /S. F. _$ TOTAL B) Mechanically attached: a) Small Roof Repair Areas: 0 S.F. - 500 S.F. Approximately:- Locations = 500 S.F(& $ /S. F. _ $ TOTAL b) Medium Roof Repair/Replacement areas. 501 S.F. -10,000 S.F. Approximately: (2) Locations = 7.500 SY @ $ /S. F. _$ TOTAL c) Large Roof Repair/Replacement Areas: Over 10,001 S.F. Approximately. (3,) Locations = 25, 000 SY @ $ /S. F. _$ TOTAL ITEM 4: Furnish all materials, labor, and equipment to install 4 ply modified bitumen system, with 2 -ply base flashing, anchor sheet, with vent sheet, without insulation. a) Small Roof Repair Areas: 0 S.F. - 500 S.F... Approximately: Q Locations = 500 S.F@ $ /S. F. = $ TOTAL b) Medium Roof Repair/Replacement areas. 501 S.F. -10,000 S.F. Approximately: (2) Locations = 7,500 S.F @ $ /S. F. =$ TOTAL c) Large Roof Repair/Replacement Areas: Over 10,001 S.F. Approximately: (4) Locations = 25, 000 SY @ $ /S. F. _$ TOTAL ITEM 5: Furnish all materials, labor, and equipment to install 4 ply modified bitumen system, with 2 -ply base flashing, anchor sheet, without vent sheet (uninsulated applications). A) Mopped in: a) Small Roof Repair Areas: 0 S.F. - 500 S.F. Approximately: Locations = 500 S.F@ $ /S. F. _ $ b) Medium Roof Repair/Replacement areas. 501 S.F. -10,000 S.F. Approximately: (2) Locations = 7,500 S.F @ $ /S. F. _ $ TOTAL TOTAL Revised 6/27/18 Page 49 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS c) Large Roof Repair/Replacement Areas: Over 10,001 S.F. Approximately: (4) Locations = 46,200 SF @ $ /S. F. _ $ TOTAL B) Mechanically attached: a) Small Roof Repair Areas: 0 S.F. - 500 S.F. Approximately: Locations = 500 S.F@ $ /S. F. = $ TOTAL b) Medium Roof Repair/Replacement areas. 501 S.F. - 10,000 S.F. Approximately: (2) Locations = 7,500 S.F @ $ /S. F. = $ TOTAL c) Large Roof Repair/Replacement Areas: Over 10,001 S.F. Approximately:_ Locations =-25, 000 S.F @ $ /S. F. _ $ TOTAL C) Torched Down attached: a) Small Roof Repair Areas: 0 S.F. - 500 S.F. Approximately: (2) Locations = 500 S.F@ $ /S. F. = $ TOTAL b) Medium Roof Repair/Replacement areas. 501 S.F. - 10,000 S.F. Approximately: (2) Locations = 7,500 S.F @ $ /S. F. = $ TOTAL c) Large Roof Repair/Replacement Areas: Over 10,001 S.F. Approximately: (3) Locations =25,000 S.F @ $ /S. F. _ $ TOTAL D) Aluminum Roof Coating (For reflectivity for black roof systems (SRI 68 Min.): (Such as `Apoch' Premium Rubberized Aluminum Roof Coating) a) Small Roof Repair Areas: 0 S.F. - 500 S.F. Approximately: (2) Locations = 500 S.F@ $ /S. F. = $ TOTAL b) Medium Roof Repair/Replacement areas. 501 S.F. -10,000 S.F. Approximately: (2) Locations = 8,800 S.F @ $ /S. F. = $ TOTAL c) Large Roof Repair/Replacement Areas: Over 10,001 S.F. Approximately: - U4 Locations =46,200 SF @ $ /S. F. _$ TOTAL Revised 6/27/18 Page 50 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS ITEM 6: Furnish all materials, labor, and equipment to install approved cants, 1% inches thickness by 3%z inches wide. a) Small Roof Repair Areas: 0 S.F. - 500 S.F. Approximately: 21 Locations = 25 L-F(d) $ /L. F. _ $ TOTAL b) Medium Roof Repair/Replacement areas. 501 S.F.- 10,000 S.F.L Approximately: (2) Locations = 90 L.F@ $ /L. F. _ $ TOTAL c) Large Roof Repair/Replacement Areas: Over 10,001 S.F. L Approximately: (4) Locations =_200 LY @ $ /L. F. _ $ TOTAL ITEM 7: Furnish all materials, labor, and equipment to install flexible, non-metallic flashings, 18 inches wide. a) Small Roof Repair Areas: 0 S.F. - 500 S.F. Approximately: � Locations = 25 L.F@ $ /L. F. _ $ TOTAL b) Medium Roof Repair/Replacement areas. 501 S.F. - 10,000 S.F. Approximately: � Locations = 90 L.F@ $ /L. F. _ $ TOTAL c) Large Roof Repair/Replacement Areas: Over 10,001 S.F. Approximately: (4) Locations = 200 LY @ $ /L. F. _ $ TOTAL ITEM 8: Furnish all materials, labor, and equipment to install built- up roof repair/replacement, including pea gravel protection. a) Small Roof Repair Areas: 0 S.F. - 500 S.F. Approximately:(1) Location = 450 S.F@ $ /S. F. _ $ TOTAL b) Medium Roof Repair/Replacement areas. 501 S.F. -15,000 S.F. Approximately: Locations = 12,000 S.F @ $ /S. F. _ $ TOTAL ITEM 9: Furnish all materials, labor, and equipment to install built-up roof pea gravel. a) Small Roof Repair Areas: 0 S.F. - 500 S.F. Approximately:_Llj Location = 450 S.F@ $ /S. F. _ $ TOTAL b) Medium Roof Repair/Replacement areas. 501 S.F. -15,000 S.F. Approximately: (2) Locations = 12,000 S.F @ $ /S. F. _ $ TOTAL Revised 6/27/18 Page 51 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS ITEM 10: Furnish all materials, labor, and equipment to install wall sheet metal flashing, 24 -gauge stainless steel, 8 inches wide. a) Small Roof Repair Areas: 0 S.F. - 500 S.F. Approximately: (2) Locations = 25 L.F(& $ /L. F. _ $ TOTAL b) Medium Roof Repair/Replacement areas. 501 S.F. - 10,000 S.F. Approximately: (2) Locations = 90 L.F@ $ /L.F. =$ TOTAL c) Large Roof Repair/Replacement Areas: Over 10,001 S.F. Approximately: (4) Locations = 200 L.F @ $ /L. F. = $ TOTAL ITEM 11: Furnish all materials, labor, and equipment to install continuous 4 -inches metal drip edge. A) 24 Gauge Galvanized Steel a) Small Roof Repair Areas: 0 S.F. - 500 S.F. Approximately. 2) Locations = 25 L.F@ $ /L. F. _ $ TOTAL b) Medium Roof Repair/Replacement areas. 501 S.F. - 10,000 S.F. Approximately: (2) Locations = 90 L.F@ $ /L. F. _ $ TOTAL c) Large Roof Repair/Replacement Areas: Over 10,001 S.F. Approximately: (4) Locations = 200 LY @ $ /L. F. _ $ TOTAL B) 24 Gauge Stainless Steel a) Small Roof Repair Areas: 0 S.F.' - 500 S.F. Approximately: (2) Locations = 25 L.F@ $ /L. F. _ $ TOTAL b) Medium Roof Repair/Replacement areas. 501 S.F. - 10,000 S.F. Approximately: (2) Locations = 90 L.F@ $ /L. F. _ $ TOTAL c) Large Roof Repair/Replacement Areas: Over 10,001 S.F. Approximately: (4) Locations = 200 L.F @ $ /L. F. _ $ TOTAL Ci) Copluer a) Small Roof Repair Areas: 0 S.F. - 500 S.F. Approximately: (2) Locations = 25 L.F@ $ /L. F. _ $ TOTAL Revised 6/27/18 Page 52 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS b) Medium Roof Repair/Replacement areas. 501 S.F. -10,000 S.F. Approximately: (2) Locations = 90 L.F@ $ /L.F. _ $ TOTAL c) Large Roof Repair/Replacement Areas: Over 10,001 S.F. Approximately: Locations = 200 LY @ $ /L. F. _ $ TOTAL D) Aluminum a) Small Roof Repair Areas: 0 S.F. - 500 S.F. Approximately. 2) Locations = 25 L.F@ $ /L. F. _ $ TOTAL b) Medium Roof Repair/Replacement areas. 501 S.F. - 10,000 S.F. Approximately: (2) Locations = 90 L.F@ $ /L. F. _ $ TOTAL c) Large Roof Repair/Replacement Areas: Over 10,001 S.F. Approximately: (4) Locations = 200 LY @ $ /L. F. _ $ TOTAL ITEM 12: Furnish all materials, labor, and equipment to install wall counter flashing 24 -gauge stainless steel, surface mounted with spring lock reglet and 24 -gauge stainless steel flashing, 6- inches vertical. a) Small Roof Repair Areas: 0 S.F. - 500 S.F. Approximately: (2) Locations = 25 L.F(&, $ /L. F. _ $ TOTAL b) Medium Roof Repair/Replacement areas. 501 S.F. - 10,000 S.F. Approximately: (2) Locations = 90 L.F@ $ /L. F. _ $ TOTAL c) Large Roof Repair/Replacement Areas: Over 10,001 S.F. Approximately: (4) Locations = 200 L.F @ $ /L. F. _ $ TOTAL ITEM 13: Furnish all materials, labor, and equipment to install metal coping cap, snap-lok system, 8 -inches wide. A) 24 Gauge Galvanized Steel a) Small Roof Repair Areas: 0 S.F. - 500 S.F. Approximately: (2) Locations = 25 L.F@ $ /L. F. _ $ TOTAL b) Medium Roof Repair/Replacement areas. 501 S.F. -10,000 S.F. Approximately: - U2 Locations = 90 L.F@ $ /L. F. _ $ TOTAL Revised 6/27/18 Page 53 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS c) Large Roof Repair/Replacement Areas: Over 10,001 S.F. Approximately: (4) Locations = 200 L.F @ $ /L. F. _ $ TOTAL B) 24 Gauge Stainless Steel a) Small Roof Repair Areas: 0 S.F. - 500 S.F. Approximately: (2) Locations = 25 L.F(&,$ /L. F. _ $ TOTAL b) Medium Roof Repair/Replacement areas. 501 S.F.- 10,000 S.F. Approximately: Locations = 90 L.F@ $ /E. F. _ $ TOTAL c) Large Roof Repair/Replacement Areas: Over 10,001 S.F. Approximately: (4) Locations = 200 LY @ $ /L. F. = $ TOTAL C) Aluminum with Mnar Finish a) Small Roof Repair Areas: 0 S.F. - 500 S.F. Approximately: (2) Locations = 25 L.F@ $ /L. F. _ $ TOTAL b) Medium Roof Repair/Replacement areas. 501 S.F. -10,000 S.F. Approximately: (2) Locations = 90 L.F@ $ /L. F. _ $ TOTAL c) Large Roof Repair/Replacement Areas: Over 10,001 S.F. Approximately: � Locations = 200 LY @ $ /L. F. _ $ TOTAL ITEM 14: Furnish all materials, labor, and equipment to install pipe mounting pedestals (4), with equipment rail (3 feet x 3 feet), and flashing, 18 inches high. Approximately : *$ /EACH = $ TOTAL ITEM 15: Furnish all materials, labor, and equipment to install pitch pocket, for 6 -inch diameter vertical element. Approximately: (4) *$ /EACH = $ TOTAL ITEM 16: Furnish all materials, labor, and equipment to install pipe or duct mounting roof pedestal, 18 gauge galvanized steel complete with flashing, 12 -inches high. Approximately: (4) *$ /EACH = $ TOTAL Revised 6/27/18 Page 54 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS ITEM 17:Fumish all materials, labor, and equipment to install roof penetration flashings, stainless steel 26 GA., with sealant cover, for vertical 6 -inch diameter element, 9 inches high, umbrella type. Approximately: (4) @ /EACH = $ TOTAL ITEM 18: Furnish all materials, labor, and equipment to install 12 inches high, 3 feet wide x 3 feet long, roof equipment support curbs, 1 %2 inches thick 3 lbs., rigid insulation, 18 GA., Galvanized steel shell, base plate and fully mitered 3 inches cant. Approximately : (4) @ _/EACH = 9 TOTAL ITEM 19: Furnish all materials, labor, and equipment to install rubber boot flashings for vertical round penetrations, typically vent stacks, 4-6 inches diameter, 8 inches high, complete with stainless steel clamps. Approximately: (4) @_L_/EACH = $ TOTAL ITEM 20: Furnish all materials, labor, and equipment to install 6 -inch roof drains, standard dura -coated cast iron, steel inserts with strainer, and clamps (by Zurn, or City approved equal). Approximately: (4) @ $ /EACH = $ TOTAL ITEM 21: Furnish all materials, labor, and equipment to install expansion joint cover, without blocking. a) Small Roof Repair Areas: 0 S.F. - 500 S.F. Approximately: _L21 Locations = 25 L.F@ $ /L. F. _ $ TOTAL b) Medium Roof Repair/Replacement areas. 501 S.F. -10,000 S.F. Approximately: @ Locations = 90 L.F@ $ /L. F. _ $ TOTAL c) Large Roof Repair/Replacement Areas: Over 10,001 S.F. Approximately: (4) Locations = 200 LY @ $ /L. F. _ $ ITEM 22: Furnish all materials, labor, and equipment to install plumbing vent flashing, lead sleeve and coupling, installed 4 -inch pipe. Approximately: (4) 9$ /EACH = $ TOTAL 1V1t1L Revised 6/27/18 Page 55 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS ITEM 23: Furnish all materials, labor, and equipment to install 8 inches high x 16 inches wide metal scupper, (4) sided with integral drip strip and surface reglet flashing. A) 24 Gauge Galvanized Steel: Approximately: (4) @ $ /EACH = $ 1 V1All B) 24 Gauge Stainless Steel : Approximately: (4) @ $ /EACH = $ 1 VIAL ITEM 24: Furnish all materials, labor, and equipment to install 6 -inch diameter leader. A) 24 Gauge Galvanized Steel a) Small Roof Repair Areas: 0 S.F. - 500 S.F. Approximately: -L21 Locations = 25 L.F@ $ /L. F. _ $ TOTAL b) Medium Roof Repair/Replacement areas. 501 S.F. -10,000 S.F. Approximately: (2) Locations = 90 L.F@ $ /L. F. _ $ TOTAL c) Large Roof Repair/Replacement Areas: Over 10,001 S.F. Approximately: - U4 Locations = 200 L.F @ $ /L. F. _ $ TOTAL B) 24 Gauge Stainless Steel a) Small Roof Repair Areas: 0 S.F. - 500 S.F. Approximately: _L21 Locations = 25 L.F@ $ /L. F. _ $ TOTAL b) Medium Roof Repair/Replacement areas. 501 S.F. - 10,000 S.F. Approximately: (2) Locations = 90 L.F@ $ /L. F. _ $ 1 VIAL c) Large Roof Repair/Replacement Areas: Over 10,001 S.F. Approximately. 4) Locations = 200 LY @ $ /L. F. _ $ TOTAL C) Anodized Aluminum a) Small Roof Repair Areas: 0 S.F. - 500 S.F. Approximately:_ U2 Locations = 25 L.F@ $ /L. F. _ $ TOTAL b) Medium Roof Repair/Replacement areas. 501 S.F.- 10,000 S.F. Approximately: (2) Locations = 90 L.F@ $ /L. F. _ $ TOTAL c) Large Roof Repair/Replacement Areas: Over 10,001 S.F. Approximately: (4) Locations = 200 L.F @ $ /L. F. _ $ 1V1HL Revised 6/27/18 Page 56 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS ITEM 25: Furnish all materials, labor, and equipment to install continuous 4 -inch -wide metal gutter system. A) 24 Gauge Galvanized Steel a) Small Roof Repair Areas: 0 S.F. - 500 S.F. Approximately: Locations = 25 L.F(ib,$ /L. F. _ $ TOTAL b) Medium Roof Repair/Replacement areas. 501 S.F. - 10,000 S.F. Approximately: (2) Locations = 90 L.F@ $ /L. F. _ $ TOTAL c) Large Roof Repair/Replacement Areas: Over 10,001 S.F. Approximately: (4) Locations = 200 LY @ $ /L. F. _ $ TOTAL B) 24 Gauge Stainless Steel a) Small Roof Repair Areas: 0 S.F. - 500 S.F. Approximately: � Locations = 25 L.F@ $ /L. F. _ $ 1V1HL b) Medium Roof Repair/Replacement areas. 501 S.F. -10,000 S.F. Approximately: (2) Locations = 90 L.F@ $ /L. F. = $ TOTAL c) Large Roof Repair/Replacement Areas: Over 10,001 S.F. Approximately: (4) Locations = 200 L.F @ $ /L. F. = $ TOTAL C) Anodized Aluminum a) Small Roof Repair Areas: 0 S.F. - 500 S.F. Approximately: (2) Locations = 25 L.F@ $ /L. F. _ $ 1V1HL b) Medium Roof Repair/Replacement areas. 501 S.F. - 10,000 S.F. Approximately: (2) Locations = 90 L.F@ $ /L. F. _ $ 1V1HL c) Large Roof Repair/Replacement Areas: Over 10,001 S.F. Approximately: (4) Locations = 200 L.F @ $ /L. F. _ $ TOTAL ITEM 26: The following time costs are for emergency work only as authorized by the City of Sunrise: A) Supervisor (Labor price should be included in your bid for items indicated) Regular Rate Approximately: 500 Hours @ $ /HOUR = $ 1VIHL Revised 6/27/18 Page 57 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS Overtime Rate Approximately: 200 Hours @ $ /HOUR = $ TOTAL B) Journeyman (Labor price should be included in your bid for items indicated) Regular Rate Approximately: 500 Hours @ $ /HOUR = $ Overtime Rate Approximately: 200 Hours @ $ /HOUR = $ C) Roofer's Helper (Labor price should be included in your bid for items indicated) Regular Rate Approximately: 500 Hours @ $ /HOUR = $ TOTAL Overtime Rate Approximately: 200 Hours @ $ /HOUR = $ TOTAL ITEM 27: Furnish all materials, labor, and equipment to install 60 Mil, Type II, fabric reinforced Uniform EPDM with a Class `A' Rating. The membrane is to be mechanically fastened through the metal deck system (approved warranty method as manufactured by `Carlisle Syntec' for existing warrantied system. a) Small Roof Repair Areas: 0 S.F. - 200 S.F. Approximately: - U2 Locations = 500 S.F@ $ /S. F. = $ TOTAL b) Medium Roof Repair/Replacement areas. 200 S.F. — 2,000 S.F. Approximately: (2) Locations = 1,500 SF @ $ /S. F. = $ TOTAL c) Large Roof Repair/Replacement Areas: Over 2,000 S.F. Approximately: (4) Locations = 5,200 SY @ $ /S. F. _ $ TOTAL Revised 6/27/18 Page 58 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS ITEM 28: Furnish all materials, labor, and equipment to install 60 Mil, fabric reinforced Uniform TPO (Thermoplastic Polyolefin Sheet) with exposed white face, min. SRI 78, fully adhered / mechanically fastened system as manufactured by `Carlisle Syntec for existing approved warrantied system. The membrane is to be mechanically fastened through the metal deck system or adhered to concrete deck (approved warranty method as manufactured by `Carlisle Syntec' or other manufacturer for existing warrantied system). a) Small Roof Repair Areas: 0 S.F. - 500 S.F. Approximately:_ Locations = 500 S.F@ $ /S. F. = $ TOTAL b) Medium Roof Repair/Replacement areas. 500 S.F. — 3,000 S.F. Approximately: � Locations = 3,500 SY @ $ /S. F. = $ TOTAL c) Large Roof Repair/Replacement Areas: Over 3,000 S.F. Approximately: (3) Locations =25,000 S.F @ $ /S. F. _$ TOTAL ITEM 29: Furnish all materials, labor, and equipment to install Built Up Coal Tar Roofing system with membrane ply sheets as indicated. a) Small Roof Repair Areas: 0 S.F. - 500 S.F. Approximately: (2) Locations = 500 S.F@ $ /S. F. = $ TOTAL b) Medium Roof Repair/Replacement areas. 501 S.F. —10,000 S.F. Approximately: (2) Locations = 3,500 S.F @ $ /S. F. = $ TOTAL c) Large Roof Repair/Replacement Areas: Over 10,000 S.F. Approximately: (4) Locations =22,200 S.F @ $ /S. F. =$ TOTAL ITEM 30: Furnish all materials, labor, and equipment for existing roof tear - off, down to substrate. This item also includes all disposal costs. A) Asphalt Shingles: a) Small Roof Repair Area: 0 S.F. - 500 S.F. Approximately: _Qj Locations = 1,500 S.F @ $ /S. F. = $ TOTAL b) Medium to Large Roof Repair Area 501 S.F. and Up Approximately: - U2 Locations =-2, 000 SF @ $ /S. F. = $ TOTAL Revised 6/27/18 Page 59 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS B) Concrete/Clay Tile a) Small Roof Repair Area: 0 S.F. - 500 S.F. Approximately: (3) Locations = 1,500 S.F @ $ /S. F. = $ TOTAL b) Medium to Large Roof Repair Area 501 S.F. and Up Approximately: _ U2 Locations =-2, 000 SY @ $ /S. F. = $ TOTAL C) Standing Seam Metal Roof a) Small Roof Repair Area: 0 S.F. - 500 S.F. Approximately: (3) Locations = 1,500 S.F @ $ /S. F. = $ TOTAL b) Medium to Large Roof Repair Area 501 S.F. and Up Approximately: -A�21 Locations =-2, 000 S.F @ $ /S. F. = $ TOTAL D) Metal Shingles a) Small Roof Repair Area: 0 S.F. - 500 S.F. Approximately: (3) Locations = 1,500 S.F @ $ /S. F. = $ TOTAL b) Medium to Large Roof Repair Area 501 S.F. and Up Approximately: � Locations =-2, 000 SY @ $ /S. F. = $ TOTAL ITEM 31: Furnish all materials, labor, and equipment for the replacement of deteriorated wood substrates. A) 5/8 -inch CDX Plywood: a) Small Roof Repair Area: 0 S.F. - 500 S.F. Approximately: (3) Locations = 1,500 S.F @ $ /S. F. _ $ 1V1HL b) Medium to Large Roof Repair Area 501 S.F. and Up Approximately: _Q1 Locations =-2, 000 SY @ $ /S. F. _ $ TOTAL B) 2 -inches x 6 -inches T&G Wood (Fir): a) Small Roof Repair Area: 0 S.F. - 500 S.F. Approximately: (3) Locations = 1,500 S.F @ $ /S. F. _ $ Curved Roof.• (])Location = 1, 500 S. F @ $ /S. F. = $ I"IAll TOTAL Revised 6/27/18 Page 60 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS b) Medium to Large Roof Repair Area 501 S.F. and Up Approximately: (2) Locations = 2,000 S.F @ $ /S. F. _ $ 1 VIAL Curved Roof (])Location = 2,500 SF@ $ /S. F. = $ TOTAL ITEM 32: Furnish all materials, labor, and equipment to install the underlayment materials. A) 6 Mil Polvethvlene Sheet: a) Small Roof Repair Area: 0 S.F. - 500 S.F. Approximately: (3) Locations = 1,500 S.F@ $ /S. F. _ $ TOTAL b) Medium to Large Roof Repair Area 501 S.F. and Up Approximately: _(2) Locations = 2,000 SF@ $ /S. F. _ $ TOTAL B) 30 Lbs. Felts saturated, organic: a) Small Roof Repair Area: 0 S.F. - 500 S.F. Approximately: (3) Locations = 1,500 S.F @ $ /S. F. = $ TOTAL b) Medium to Large Roof Repair Area 501 S.F. and Up Approximately: (2) Locations = 2,000 S.F @ $ /S. F. = $ TOTAL C) Self -Adhering underlavment granular face sheet. 55 Mils, fiberglass mat reinforced and SBS asphalt: a) Small Roof Repair Area: 0 S.F. - 500 S.F. Approximately: (3) Locations = 1,500 S.F@ $ /S. F. = $ TOTAL b) Medium to Large Roof Repair Area 501 S.F. and Up Approximately: (2) Locations = 2,000 S.F @ $ /S. F. = $ TOTAL D) Self -Adhering underlavment polvethvlene sheet. 40 Mils, slip resisting polythene film. a) Small Roof Repair Area: 0 S.F. - 500 S.F. Approximately. 3) Locations = 1,500 S.F @ $ /S. F. = $ TOTAL b) Medium to Large Roof Repair Area 501 S.F. and Up Approximately: (2) Locations = 2,000 S.F @ $ /S. F. = $ 1 V 1 t1L Revised 6/27/18 Page 61 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS E) Self -Adhering sheet underlayment. high temperature sheet. 40 Mils, with slip resisting. polyethylene ton surface laminated to SBS modified asphalt adhesive: a) Small Roof Repair Area: 0 S.F. - 500 S.F. Approximately: (3) Locations = 1,500 S.F@ $ /S. F. _ $ 1VIAil b) Medium to Large Roof Repair Area 501 S.F. and Up Approximately: (2) Locations = 2,000 S.F @ $ /S. F. _ $ TOTAL F) Slip sheet building paper. 5 lbs../100 S.F.. rosin sized a) Small Roof Repair Area: 0 S.F. - 500 S.F. Approximately: (3) Locations = 1,500 S.F @ $ /S. F. = $ TOTAL b) Medium to Large Roof Repair Area 501 S.F. and Up Approximately: -(2� Locations = 2, 000 S.F @ $ /S. F. = $ TOTAL ITEM 33: Furnish all materials, labor, and equipment to install pressure treated blocking. A) 2 x 4 a) Small Roof Repair Area: 0 S.F. - 500 S.F. Approximately: (3) Locations = 100 L.F. @ $ /L. F. _ $ 1V1HL b) Medium to Large Roof Repair Area 501 S.F. and Up Approximately: � Locations = 300 L.F. @ $ /L. F. _ $ B) 2 x 6 1V1HL a) Small Roof Repair Area: 0 S.F. - 500 S.F. Approximately: (3) Locations = 100 L.F. @ $ /L. F. = $ TOTAL b) Medium to Large Roof Repair Area 501 S.F. and Up Approximately: (2) Locations = 300 L.F. @ $ /L. F. = $ TOTAL C) 2 x 8 a) Small Roof Repair Area: 0 S.F. - 500 S.F. Approximately: (3) Locations = 100 L.F. @ $ /L. F. = $ TOTAL b) Medium to Large Roof Repair Area 501 S.F. and Up Approximately: (2) Locations = 300 L.F. @ $ /L. F. = $ 1V1HL Revised 6/27/18 Page 62 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS ITEM 34: Furnish all materials, labor, and equipment to install sheet metal flashings and trim. A) 24 Gauge Stainless Steel Drip Edge — 4 -inch Profile a) Small Roof Repair Area: 0 S.F. - 500 S.F. Approximately: (3) Locations = 100 L.F. @ $ /L. F. _ $ 1V1HL b) Medium to Large Roof Repair Area 501 S.F. and Up Approximately: � Locations = 300 L.F. @ $ /L. F. _ $ TOTAL ITEM 35: Furnish all materials, labor, and equipment to install metal gutter. A) 6 -inch x 6 -inch 24 Gauge Galvanized Steel Gutter a) Small Roof Repair Area: 0 S.F. - 500 S.F. Approximately: (3) Locations = 100 L. F. @ $ /L. F. _ $ 1V1HL b) Medium to Large Roof Repair Area 501 S.F. and Up Approximately: (2) Locations = 300 L.F. @ $ /L. F. _ $ TOTAL B) 6 -inch x 6 -inch Aluminum Gutter a) Small Roof Repair Area: 0 S.F. - 500 S.F. Approximately: (3) Locations = 100 L. F. @ $ /L. F. _ $ 1VIAll b) Medium to Large Roof Repair Area 501 S.F. and Up Approximately: (2) Locations = 300 L.F. @ $ /L. F. _ $ TOTAL ITEM 36: Furnish all materials, labor, and equipment to install rigid standard ridge vent, high density polypropylene or UV - stabilized plastic. a) Small Roof Repair Area: 0 S.F. - 500 S.F. Approximately: _ U3 Locations = 100 L.F. @ $ /L. F. = $ TOTAL b) Medium to Large Roof Repair Area 501 S.F. and Up. Approximately: _ U2 Locations = 300 L.F. @ $ /L.F. = $ TOTAL Revised 6/27/18 Page 63 113"11M0="I LIRA A"Ll-Ij BID NUMBER: ROOFING MAINTENANCE & REPAIRS ITEM 37: Furnish all materials, labor, and equipment to install glass fiber reinforced asphalt shingles, mineral -granular surfaced self- sealing. a) Small Roof Repair Area: 0 S.F. - 500 S.F. Approximately: - U3 Locations =1500 SY @ $ /S. F. = $ TOTAL b) Medium to Large Roof Repair Area 501 S.F. and Up. Approximately: (2) Locations = 2, 000 S.F @ $ /S. F. = $ TOTAL ITEM 38: Furnish all materials, labor, and equipment to install 20 oz. Copper shingles 34 -inches x 12 -inches, 2 clips per panel. a) Small Roof Repair Area: 0 S.F. - 500 S.F.. Approximately. 3) Locations = 1,500 S.F @ $ /S. F. _ $ TOTAL b) Medium to Large Roof Repair Area 501 S.F. and Up. Approximately: - U2 Locations = 2, 000 SY @ $ /S. F. _ $ TOTAL ITEM 39: Furnish all materials, labor, and equipment to install galvanized steel sheet, .0276 inch with siliconized polyester coating. A) Standing Seam a) Small Roof Repair Area: 0 S.F. - 500 S.F. Approximately: (3) Locations = 1,500 S.F @ $ /S. F. _ $ TOTAL b) Medium to Large Roof Repair Area 501 S.F. and Up Approximately: (2) Locations = 2,000 S.F @ $ /S. F. _ $ TOTAL B) Batten Seam a) Small Roof Repair Area: 0 S.F. - 500 S.F. Approximately: (3) Locations = 1,500 S.F @ $ /S. F. _ $ TOTAL b) Medium to Large Roof Repair Area 501 S.F. and Up Approximately:_ Locations =1 000 S.F @ $ /S. F. _ $ 1 U1 AL Revised 6/27/18 Page 64 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS ITEM 40: Furnish all materials, labor, and equipment to install aluminum sheet, coil coated alloy, .040 inch with siliconized polyester coating. A) Standing Seam a) Small Roof Repair Area: 0 S.F. - 500 S.F. Approximately: (3) Locations = 1,500 S.F @ $ /S. F. _ $ TOTAL b) Medium to Large Roof Repair Area 501 S.F. and Up Approximately: _U2 Locations = 2,000 S.F@ $ /S. F. _ $ B) Batten Seam a) Small Roof Repair Area: 0 S.F. - 500 S.F. Approximately. 3) Locations = 1,500 S.F @ $ /S. F. _ $ 1V1HL b) Medium to Large Roof Repair Area 501 S.F. and Up Approximately: (2) Locations = 2, 000 S.F @ $ /S. F. _ $ TOTAL C) Flat Seam a) Small Roof Repair Area: 0 S.F. - 500 S.F. Approximately: (3) Locations = 1,500 S.F @ $ /S. F. = $ TOTAL b) Medium to Large Roof Repair Area 501 S.F. and Up Approximately: (2) Locations = 2, 000 S.F @ $ /S. F. = $ TOTAL D) Ridged Metal Building Roofing (Through Metal Building Manufacturer) a) Small Roof Repair Area: 0 S.F. - 500 S.F. Approximately: (3) Locations = 1,500 S.F @ $ /S. F. _ $ 1 VI'All b) Medium to Large Roof Repair Area 501 S.F. and Up Approximately: (2) Locations =-2, 000 SY @ $ /S. F. _ $ TOTAL Revised 6/27/18 Page 65 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS ITEM 41: Furnish all materials, labor, and equipment to install clay roof tile. A) Spanish "S" Tile a) Small Roof Repair Area: 0 S.F. - 500 S.F. Approximately: (3) Locations = 1,500 SF @ $ /S. F. = $ TOTAL b) Medium to Large Roof Repair Area 501 S.F. and Up Approximately. 2) Locations = 2,000 S.F @ $ /S. F. = $ TOTAL B) Barrel Tile a) Small Roof Repair Area: 0 S.F. - 500 S.F. Approximately: (3) Locations = 1,500 S.F @ $ /S. F. = $ TOTAL b) Medium to Large Roof Repair Area 501 S.F. and Up Approximately. 2) Locations = 2, 000 S.F @ $ /S. F. = $ ITEM 42: Furnish all materials, labor, and equipment to install 4" diameter leader. A) 24 Gauge Galvanized Steel a) Small Roof Repair Area: 0 S.F. - 500 S.F. Approximately: (3) Locations = 100 L.F. @ $ /L. F. = $ TOTAL b) Medium to Large Roof Repair Area 501 S.F. and Up Approximately: _C21 Locations = 300 L. F. @ $ /L. F. = $ TOTAL B) Anodized Aluminum a) Small Roof Repair Area: 0 S.F. - 500 S.F. Approximately: � Locations = 100 L. F. @ $ /L. F. = $ TOTAL b) Medium to Large Roof Repair Area 501 S.F. and Up Approximately. 2) Locations = 300 L.F. @ $ /L. F. = $ TOTAL C) 24 Gauge Stainless Steel a) Small Roof Repair Area: 0 S.F. - 500 S.F. Approximately: � Locations = 100 L.F. @ $ /L. F. = $ TOTAL b) Medium to Large Roof Repair Area 501 S.F. and Up Approximately: _ U2 Locations = 300 L.F. @ $ /L. F. = $ TOTAL Revised 6/27/18 Page 66 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS ITEM 43: Furnish all materials, labor, and equipment to install concrete roof tile. A) Spanish "S" Tile a) Small Roof Repair Area: 0 S.F. - 500 S.F. Approximately: (3) Locations = 1,500 S.F @ $ /S. F. = $ TOTAL b) Medium to Large Roof Repair Area 501 S.F. and Up Approximately:_L21 Locations = 2, 000 S.F @ $ /S. F. = $ TOTAL B) Flat Shingle a) Small Roof Repair Area: 0 S.F. - 500 S.F. Approximately: (3) Locations =1 500 S.F @ $ /S. F. = $ TOTAL b) Medium to Large Roof Repair Area 501 S.F. and Up Approximately: (2) Locations = 2, 000 S. F @ $ /S. F. = $ TOTAL ITEM 44: Supplies not listed or included elsewhere MAY be purchased under this contract on a strictly COST-PLUS arrangement only. Documentation of vendor cost must be provided with written (City) estimates. Provide percent markup. City staff estimates approximately $25,000 worth of this type of material will be required per year. $25, 000 x % = $ 1V1AL ITEM 45: Crane Rental ALLOWANCE — based upon receipts and as authorized by the City. ALLOWANCE $ 20,000.00 TOTAL Revised 6/27/18 Page 67 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS ITEM 46: Annual inspections of all roof types to be included in a Roofing Inspection Report. Roofing Inspection and Report The report will be comprehensive and include a quote for repairs formatted in line with the contract. The quote shall identify emergency, remedial and replacement cost. Report shall include but not be limited to the following: 1. All roofing inspection roofing numbering system shall conform with the City of Sunrise building numbers. Vendor shall coordinate the proper building numbers with the City representative to ensure inclusion into the report. 2. Providing information of the roof (i.e. date of installation, based on permitting documents, roof characteristics and geometry, roof type, roof square footage, and any other information that may be required). 3. Providing color images or photos, within the body of the report, identifying the roofing area, condition, and deficiencies that may require immediate attention. 4. Date of estimated need for replacement. 5. LOS as follows: A=10 or more years of service life remaining; 13=8 to 10 years of service life remaining; C=5 to 7 years of service life remaining; D=2 to 4 years of service life remaining; F= Less than 1 year of service life remaining. NOTE: The City may increase or reduce the total number of roof quantities needed to be inspected and reported. Approximately 100,000 S.F.@ $ /S.F. = $. TOTAL TOTAL BID OFFER: $ (Written Amount) Contingency Pricing -Emergency Up Charge Percentage: Emergency Up Charge Percentage: Vendor Name % up charge Name of Authorized Person Revised 6/27/18 Page 68 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS The City of Sunrise reserves the right to waive any informality in any bid and to reject gLny or all bids. The City of Sunrise reserves the right to reduce or delete any of the above items. At time of award of contract, the City reserves the right to set a maximum dollar limit that may be expended on this project. Contract quantities of any or all items may be increased, reduced, or eliminated to adjust the contract amount to coincide with the amount of work necessary or to bring the contract value to within the established limit. All quantities are estimated and the City reserves the right to increase, reduce, or eliminate the contract quantities in any amount. All deliveries will be made by Common Carrier ONLY. Yes No Delivery will be made within calendar days after receipt of purchase order. (To Be Completed ONLY if Bidder is unable to comely with specified delivery reauirements indicated within the bid document. If applicable, would you extend the prices bid herein to other municipalities? Award of bid is not contingent upon concurrence with this offer to other municipalities. Yes: No: ADDENDUM RECEIPT Bidder shall acknowledge below the receipt of any and all addenda, if any, by listing the Addenda No. and date of issuance. ADDENDUM NO: /DATE ADDENDUM NO: /DATE ADDENDUM NO: /DATE ADDENDUM NO: /DATE Vendor Name Name of Authorized Person Revised 6/27/18 Page 69 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS SCHEDULE "A" (Continued) I, the undersigned hereby agree to furnish the items and / or services described in this Invitation for Bid. I certify that I have read the entire document, including the Specifications, Requirements, Terms & Conditions and Schedules, and agree to furnish the items and services under the requirements of the Bid. I also certify that this Bid is submitted without prior understanding, agreement, or connection with any corporation, firm or person submitting a Request for Submittal for the same materials, services, and supplies and is in all respects fair and without collusion or fraud. The Respondent certifies by his/her signature that the person signing this Certification is authorized to bind the firm by their signature. Company Name: Address City Phone# Signature: Printed Name: FEID or Social Security No. State Zip Fax# E -Mail Title SOCIAL SECURITY NUMBER COLLECTION DISCLOSURE STATEMENT Please be advised that pursuant to Section 119.071(5) (a) 2.a., Florida Statutes, the City of Sunrise ("City") discloses that the City requests your social security number for the purpose of payroll eligibility verification, processing employment benefits, income reporting, tax reporting, background checks on employee applicants, advisory board applicants and other City program volunteers. Social security numbers are also used as a unique numeric identifier and may be used for search purposes. Revised 6/27/18 Page 70 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS SCHEDULE "B" CITY OF SUNRISE NON -COLLUSION AFFIDAVIT This affidavit is to be filled in, executed and notarized by the Bidder. If the bid is made by a Corporation, then it should be executed by its Chief Officer. This document MUST be submitted with the bid. STATE OF ) ) SS COUNTY OF ) being first duly sworn, deposes and says that (Type or print name of person who is signing below) He/she is the (Owner, Partner, Officer, Representative or Agent) of the Bidder that has submitted the attached Bid. 2. He/she is fully informed with respect to the preparation and contents of the attached Bid and of all pertinent circumstances respecting such Bid. 3. Said Bid is made without any connection or common interest in the profits with any other persons making a Bid for the said commodities/services. Said Bid is on our part in all respects fair and without collusion or fraud. No head of any department, any employee or any officer of the City of Sunrise is directly or indirectly interested therein. If any relatives are employed by the City, indicate name and relationship below. Name: Relationship: Name: Relationship: Company Name: Bidders' Authorized Signature: Subscribed and sworn to before me this Notary Public (Print, Type or Stamp name of Notary Public) Personally known or Produced I.D. Type and number of I.D. Produced: day of 120. Revised 6/27/18 Page 71 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS SCHEDULE "C" CITY OF SUNRISE BIDDER'S DRUG - FREE WORKPLACE CERTIFICATION Preference may be given to Vendors submitting a certification with their bid/Bid certifying they have a drug-free workplace in accordance with Section 287.087, Florida Statutes. This requirement affects all public entities of the State and becomes effective January 1, 1991. The special condition is as follows: IDENTICAL SUBMISSIONS - Preference may be given to businesses with drug-free workplace programs. Whenever two or more bids, Bids or replies which are equal with respect to price, quality, and service are received by the State or by any political subdivision for the procurement of commodities or Contractual services, a bid received from a business that certifies that it has implemented a drug-free workplace program shall be given preference in the award process. Established procedures for processing tie bids will be followed if none of the tied Vendors have a drug-free workplace program. In order to have a drug-free workplace program, a business shall: Publish a statement notifying employees that the unlawful manufacture, distribution, dispensing, possession, or use of a controlled substance is prohibited in the workplace and specifying the actions that will be taken against employees for violations of such prohibition. 2. Inform employees about the dangers of drug abuse in the workplace, the business's policy of maintaining a drug-free workplace, any available drug counseling, rehabilitation, and employee assistance programs, and the penalties that may be imposed upon employees for drug abuse violations. 3. Give each employee engaged in providing the commodities or Contractual services that are under bid a copy of the statement specified in subsection (1). 4. In the statement specified in subsection (1), notify the employees that, as a condition of working on the commodities or Contractual services that are under bid, the employee will abide by the terms of the statement and will notify the employer of any conviction of, or plea of guilty or nolo contendere to, any violation of chapter 893 or of any controlled substance law of the United States or any state, for a violation occurring in the workplace no later than five (5) days after such conviction. 5. Impose a sanction on, or require the satisfactory participation in a drug abuse assistance or rehabilitation program if such is available in the employee's community, by any employee who is so convicted. 6. Make a good faith effort to continue to maintain a drug-free workplace through implementation of this section. As the person authorized to sign the statement, I certify that this Vendor complies fully with the above requirements. I hereby certify that the company submitting this Bid has established a Drug Free work place program in accordance with State Statute 287.087 VENDOR'S SIGNATURE COMPANY'S NAME Revised 6/27/18 Page 72 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS SCHEDULE "D" CITY OF SUNRISE BIDDER'S QUALIFICATION STATEMENT The undersigned certifies under oath the truth and correctness of all statements and all answers to questions made hereinafter: Company Name: Address: Street City State Zip Code Telephone:( ) Fax:( E - Mail: Web Site: How many years has your organization been in business under its present name? Yes If Bidder is operating under Fictitious Name, submit evidence of compliance with Florida Fictitious Name Statute: Under what former names has your business operated? At what address was that business located? Are You Certified? Yes No If Yes, ATTACH COPY OF LICENSE Are You Licensed? Yes No If Yes, ATTACH COPY OF LICENSE Has your company or its senior officers ever declared bankruptcy? Yes No If yes, explain: Are you a sales representative, distributor, broker, manufacturer of the commodities/services bid upon? Have you ever received a Contract or a Purchase Order from the City of Sunrise or other government entity? Yes No If Yes, explain (date, service/project, bid title, etc.) Have you ever received a complaint on a Contract or bid awarded to you by any government entity? Yes No if yes, explain: Have you ever been debarred or suspended from doing business with any government entity? Revised 6/27/18 Page 73 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS Yes No If Yes, explain Please identify each incident within the last five (5) years where a civil, criminal, administrative, other similar proceeding was filed or is pending; if such proceeding arises from or is a dispute concerning the Consultant's rights, remedies or duties under a Contract for the same or similar type services to be provided under this Bid: (Attach additional sheets as necessary) Revised 6/27/18 Page 74 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS SCHEDULE "D" (Continued) REFERENCES: List all pertinent government agencies and private firm(s) with whom you have done business within the past three (3) years: Agency/Firm Name: Agency/Firm Name: Address: Address: City/State/Zip Code: City/State/Zip Code: Phone: Phone: Fax: Fax: Contact: Contact: E -Mail: E -Mail: Agency/Firm Name: Agency/Firm Name: Address: Address: City/State/Zip Code: City/State/Zip Code: Phone: Phone: Fax: Fax: Contact: Contact: E -Mail: E -Mail: Agency/Firm Name: Agency/Firm Name: Address: Address: City/State/Zip Code: City/State/Zip Code: Phone: Phone: Fax: Fax: Contact: Contact: E -Mail: E -Mail: YOUR COMPANY NAME ADDRESS PHONE: FAX: EMAIL: Revised 6/27/18 Page 75 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS SCHEDULE "E" CITY OF SUNRISE WARRANTY INFORMATION FORM ALL BLANKS SHOULD BE FILLED IN AND SUBMITTED WITH BID MINIMUM WARRANTY SHALL BE AS SPECIFIED HEREIN MAKE AND MODEL OF ITEM PROPOSED: DOES WARRANTY APPLY TO ENTIRE PACKAGE OR ONLY TO SPECIFIC PARTS? (State Explicitly) DOES WARRANTY INCLUDE LABOR FOR REPLACEMENT OF DEFECTIVE PARTS? YES NO WARRANTY PERIOD FOR PARTS REPLACEMENT WHO WILL PROVIDE LABOR, AND WHERE, IN THE EVENT OF FAILURE WITHIN WARRANTY PERIOD? TELEPHONE: EMAIL: ysI3l NEAREST SOURCE TO THE CITY OF SUNRISE FOR PARTS AND SERVICE AFTER WARRANTY PERIOD: TELEPHONE: FAX: EMAIL: A COPY OF COMPLETE WARRANTY STATEMENT IS SUBMITTED HEREWITH: YES NO NAME OF BIDDER: SIGNATURE AND TITLE: TELEPHONE: DATE: FAX: Revised 6/27/18 Page 76 BID TITLE: BID 19-17-12-HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS SCHEDULE "F" CITY OF SUNRISE PROOF OF INSURANCE & REQUIRED LICENSES ATTENTION BIDDER: ATTACH TO SCHEDULE "F" PROOF OF INSURANCE AS SPECIFIED HEREIN, AND COPIES OF LICENSES, IF REQUIRED. NOTE: Only the successful Bidder shall be required to provide a Certificate of Insurance naming the City of Sunrise as additional insured. Revised 6/27/18 Page 77 BID TITLE: BID 19 -17 -12 -HR BID NUMBER: ROOFING MAINTENANCE & REPAIRS SCHEDULE "G" CITY OF SUNRISE STATEMENT OF NO BID NOTE: If you do not intend to bid on this solicitation, please return this form immediately. Failure to return this form may result in your name being removed from the list of qualified Bidders for the City of Sunrise. Please indicate bid name and number on the outside of the envelope. Thank you. MAIL TO: CITY OF SUNRISE 10770 W. OAKLAND PARK BLVD. SUNRISE, FL 33351 ATTN: CITY CLERK'S OFFICE We, the undersigned have declined to bid for the following reason: Specification too "tight," i.e., geared toward one brand or manufacturer only (explain below). Insufficient time to respond to the Invitation for Bid. We do not offer this product or an equivalent. Our product schedule would not permit us to perform. Unable to meet specifications. Unable to meet Bond requirements. Specification unclear (explain below). Other (specify below). REMARKS: COMPANY NAME: SIGNATURE: ADDRESS: CITY: TELEPHONE NUMBER: FAX NUMBER: E MAIL: STATE: ZIP: Revised 6/27/18 Page 78 TO: VIA: FROM: DATE: RE: City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, Florida 33160 (305) 947-0606 City Hall (305) 949-3113 Fax MEMORANDUM Honorable Mayor and City Commissioners Stan Morris, City Manager Fabricio Volpi, Public Works Director March 21, 2024 Approval of an Agreement with Advanced Roofing for Roof Inspection, Maintenance, and Repair Services RECOMMENDATION: Staff recommends approval of this Resolution. REASONS: The City is in need of Contractor to provide citywide emergency roof inspection, maintenance, and repair services for municipal buildings, including but not limited to the Government Center, Gateway Center, and Pelican Community Park, on an as -needed basis. The Contractor (Advanced Roofing, INC.) is a certified and insured company with the necessary experience to provide the desired services. The City of Sunrise issued Invitation to Bid ("ITB") 19 -17 -12 -HR "Roof Maintenance and Repairs" and awarded an agreement to Advanced Roofing, Inc., beginning June 1, 2019, for an initial three (3) year term, terminating on May 31, 2022, with the option to renew for three (3) additional one (1) year terms. On April 10, 2023, the City of Sunrise exercised its option to renew its agreement with Contractor, through May 31, 2024. The City previously entered into an Agreement with Contractor for the services on February 25, 2022, for a term of four (4) months, and in an amount not -to -exceed $5,530.50. On April 13, 2022, the City amended its original Agreement with Contractor for additional Services, via Resolution No. 2022-3314, in an amount not -to -exceed $500,000.00. The original Agreement between City and Contractor has expired, although the City remains in need of the services. The original $500,000.00 the City Commission authorized via Resolution No. 2022-3314, $331,978.75 is unexpended and remains available for the services. Item Number: 10.E 119 Pursuant to the City's procurement code provisions, purchases made under state, county or other governmental contracts, or competitive bids with other entities are exempt from the City's competitive bidding procedures. Therefore, the City desires to enter into a new Agreement with Contractor, using City of Sunrise's solicitation information, Contractor's response, and the resulting contract, to provide the services in the amount of $331,978.75. ADDITIONAL INFORMATION: Copies of the complete contract documents, inclusive of the ITB and all exhibits, are on file with the Office of the City Clerk and are available upon request. FUNDING SOURCE: Funds have been appropriated in Account No. 001-5-5391-446003-00000. ATTACHMENTS: Resolution Agreement Item Number: 10.E 120