HomeMy WebLinkAboutMBR CONSTRUCTIONMichael R. Boss, President, CGC1512261
1020 NW 51st Street, Fort Lauderdale, FL 33309
(954) 486-8404 / mboss@mbrconstruction.com
ITB 24-07-01 Intracoastal Sports Park
City of Sunny Isles Beach
Purchasing Office
18070 Collins Avenue
Sunny Isles Beach, FL 33160
Proposal Date: Friday, September 6, 2024, at 11:00 AM
_____________________ Table of Contents
1. COMPANY PROFILE
2. QUALIFICATIONS
i. Letter of Introduction
ii. Similar Work Experience
3. STAFFING
i. Organizational Chart
ii. Resumes of Key Personnel
iii. References
iv. Active Projects
4. APPROACH / METHODOLOGY
5. CORPORATE STANDING AND AUTHORIZED SIGNATORY
6. LITIGATION HISTORY
7. FORMS AND ATTACHEMENTS
i. City Forms
ii. License
iii. Insurance
iv. Letter of Bondability
v. W-9
vi. Corporate annual Report
8. BID PRICE SHEET
Tab 1 – Company Profile
Company Profile
MBR Construction, Inc. is a Florida Corporation
Date of incorporation: November 10, 1992
Main Address: 1020 NW 51 Street,
Fort Lauderdale, FL 33309
Warehouse Address: 520/536/552 NE 34th Street,
Oakland Park, FL 33334
Document No.: P92000004585
FEIN: 65-0373938
Dunn & Bradstreet No.: 87-767-7492
Licenses: Michael R. Boss
CGC1512261 State of Florida General Contractor
Company Principals: Michael R. Boss, President
141 NW 33 Street
Oakland Park, FL 33309
(954) 444-7141 / mboss@mbrconstruction.com
Wendy Broccoli, Secretary /Treasurer
4240 Gault Ocean Drive
Fort Lauderdale, FL 33308
(954) 444-7694 / wcole@mbrconstruction.com
Bonding/Insurance Co.:
Agent Company: Brown and Brown of Florida, Inc
1201 West Cypress Road, Suite 130
Fort Lauderdale, FL 33309
Bonding Agent: Michael A. Holmes ARM, CIC, President
(954) 331-1313 / mholmes@bbftlaud.com
Insurance Agent: Andy Noye, CIC, CRIS, Senior Vice President
(954) 331-1319 / anoye@bbftlaud.com
Bonding Company: Liberty Mutual Insurance Company (A Rated)
1051 Winderley Place, suite 105
Maitland, FL 32751
(407) 667-1744
Certified Public Accountant: John C. Downs, Inc.
John C. Downs, CPA
1881 North University Drive, suite 107
Coral Springs, FL 33071
(954) 575-3101 / john@johndownscpa.com
Tab 2 - Qualification
EXPERIENCE ON SIMILAR PROJECTS
DESIGN BUILD SERVICES FOR CAPORELLA PARK – (2023)
The scope of work included increasing the parking lot capacity by adding four more parking
spaces and an additional handicapped space. A new entry plaza to welcome visitors, and a
1,200 square feet Restroom & Concessions Building.
In addition to these improvements, a 1/3 of a mile long concrete 8’ wide multipurpose trail
was developed, leading to all the park amenities. These amenities comprise a dedicated area
with 10 fitness stations, complete with shade for users. A 5,000 square feet playground
featuring universal-access equipment and a shade structure which provides a safe and
enjoyable space for children.
A 40x40 Picnic Shelter was constructed, equipped with picnic tables and BBQ grilles for park
visitors to enjoy outdoor meals. The project also included the installation of a stage and
amphitheater, featuring a 2,500 square feet tensile structure stage along the edge of the
lake. A grass amphitheater/plaza area for spectators overlooking the expansive lake, serving
as a picturesque backdrop for events.
Furthermore, enhancements to recreational features included a fishing pier, accessible from
the new multipurpose walking trail. The pier has added lighting for better visibility.
Additionally, a new non-motorized boat launch with a floating deck was established,
providing ADA direct access from the primary parking lot.
Original Contract Amount: $ 4,438,830.94 Final Contract Amount: $ 4,808,318.35
Client: City of Tamarac Contact: Dibb Machuca, Project Manager
Telephone: 954-597-3725 Email: Dibb.Machuca@tamarac.org
FIRMS EXPERIENCE AND QUALIFICATIONS
1 | P a g e
1. SUNRISE ATHLETIC COMPLEX RENOVATION – (2022)
Scope of Work: This project includes site
demolition, site utilities improvements,
construction of a new 15,000 SF Multi-
purpose Center, a metal structure to
house five basketball courts, new parking
lot, resurfacing of existing tennis courts,
new playground, new Concession
building, new scoreboard towers, new
sports lighting, new security and
technology systems, refurbish full size
multipurpose fields, renovations to existing meeting hall and restroom facilities, new
landscaping and Irrigation.
Original Contract Amount: $ 14,896,944.00 Final Contract Amount: $ 14,797,682.83
Client: City of Sunrise Contact: Megan Kaufold, Project Manager
Telephone: (954) 888-6070 Email: mkaufold@sunrisefl.gov
FIRMS EXPERIENCE AND QUALIFICATIONS
2 | P a g e
2. EVERGLADES HOLIDAY PARK IMPROVEMENTS – (2021)
Scope of Work: This project is located at 21940 Griffin Road in Unincorporated Broward
County. The work under this contract includes extensive renovations to the Park’s existing
site elements and infrastructure including: demolition, clearing & grubbing, earthwork,
storm water pollution prevention, storm water drainage system, fire protection pump
system, fire protection piping and hydrants, potable water service, grinder pump station,
sewer force main, asphalt pavement, pavement markings and signage, concrete sidewalks
& curbs, stamped concrete drive, site electrical service, site lighting, dock pilings, auger
cast pilings, fixed & floating docks, stone rip-rap stabilized shoreline, steel sheet piling
bulkhead, boat ramps, levee flood wall, new buildings, tree removals & relocations,
landscape & irrigation, fencing and several optional bid items.
This project bares a high level of difficulty, entailing phasing and intricate coordination, in
order to maintain uninterrupted operations to the Everglades Holiday Park business
operations and guide visitors safely thru the park. The Everglades Holiday Park maintains
a high volume of visitors to the South Florida Alligator Park which is a top attraction for
locals and visitors alike to experience the Gator Boys Alligator Rescue presentation and
hoping onto an airboat to zip across the River of Grass which is the Everglades.
Original Contract Amount: $ 10,584,210.00 Final Contract Amount: $ 11,926,727.26
Client: Broward County Parks and Recreation Contact: Mauricio Sigal, Project Manager
Telephone: (305) 608-8467 Email: msigal@broward.org
FIRMS EXPERIENCE AND QUALIFICATIONS
3 | P a g e
3. SUNRISE CITY PARK – (2020)
Scope of Work: The new and improved City Park, re-opened in November 2020, brings
impressive and contemporary park amenities to Sunrise’s original neighborhoods in the
east. This 5.5 acre leisure space was funded by park bonds overwhelmingly approved by
Sunrise voters as part of our long-term vision to foster a connected and engaged
community. The park construction included the renovation and expansion of the existing
parking lot, an expansive 140-yard multipurpose field for community events, concerts,
and a variety of sports, a new quarter-mile walking path featuring seven outdoor exercise
stations, a custom metal structure to serve as a covered amphitheater stage, two covered
event rental pavilions with gas grills, a soccer-themed 2,500 SF splash pad and sun-
shaded playground, three full covered outdoor basketball courts with professional rims
and backboards, two newly-resurfaced regulation tennis courts, and a 1,424 SF
restroom/storage building.
Original Contract Amount: $ 6,551,367.00 Final Contract Amount: $ 6,527,168.68
Client: City of Sunrise Contact: Megan Kaufold, Project Manager
Telephone: (954) 888-6070 Email: mkaufold@sunrisefl.gov
FIRMS EXPERIENCE AND QUALIFICATIONS
5 | P a g e
7. DESIGN BUILD SERVICES FOR WATERS EDGE PARK – (2019)
Scope of Work: Design build services for a new 6 acres park to
include 1,000 SF restroom/storage/IT room building, 9' wide
concrete walk, 9 exercise ADA stations in covered area, full
size basketball court NFHS compliant w/ asphalt, base and
acrylic surface, Sand Volleyball court, (2) 24' Hexagonal
shelters, 3,000 SF splash pad, 4,000 SF playground, site
furnishings, fishing pier, parking, fencing, lighting, landscape,
irrigation, WIFI/security.
Original Contract Amount: $ 3,858,175.00 Final Contract Amount: $ 3,973,116.72
Client: City of Tamarac Contact: Dibb Machuca, Project Manager
Telephone: 954-597-3725 Email: Dibb.Machuca@tamarac.org
FIRMS EXPERIENCE AND QUALIFICATIONS
4 | P a g e
4. FLAMINGO PARK – (2018)
5.
Scope of Work: The Work included Permitting and Construction of a Community Center, Covered
Basketball Courts, Soccer field, Splash Pad with all amenities, Demolition of an existing Basketball
Courts, Site Utilities and Drainage Improvements, Site Lighting throughout the park, Landscape
Irrigation, Fencing, Sidewalk and pavement restoration. Also included Security Upgrades, Cameras,
fiber optic cabling for cameras & network equip throughout the park.
Change orders: 1.Credit to demolish existing administration building and add to remodel it instead.
2.Original plans called for restriping existing parking lot; client requested milling and repaving
existing parking lot and add landscaping and irrigation.
6.
Client: City of Sunrise Contact: Errol Prizlee, Project Manager
Telephone: (954) 579-8465 Email: eprizlee@sunrisefl.gov
Original Contract Amount: $ 5,011,745.00 Final Contract Amount: $ 5,768,841.00
FIRMS EXPERIENCE AND QUALIFICATIONS
6 | P a g e
8. FLAMINGO WEST PARK – (2018)
Scope of Work: Work included construction of (4) artificial turf fields (direct purchase), a new
restroom and maintenance buildings, parking lot, boardwalk and concrete walkway, landscaping
and irrigation systems, picnic shelters, Announcer’s Booth, miscellaneous improvements including
bleachers, shade structures, benches, fishing pier and boardwalk.
Original Contract Amount: $ 5,265,301.00
Final Contract Amount: $ 5,306,427.00
Client: City of City of Cooper City
Contact: Richard Freeman, Project Manager
Telephone: (954) 434-2300
Email:rfreeman@coopercityfl.org
FIRMS EXPERIENCE AND QUALIFICATIONS
7 | P a g e
9. WINDMILL PARK IMPROVEMENTS – (2018)
Scope of Work: Improvements included the construction of a new 1,500 SF dog park pavilion with
restrooms & renovation of the existing tennis building. Other improvements include creating a new
parking lot, lighted concrete pathways with outdoor exercise stations, new playground equipment,
and renovations of all sports courts, landscaping and irrigation. Sports Courts include 6 Tennis
courts, 4 Racket ball courts, 2 Basketball courts, 2 volleyball courts, score boards, sports lighting.
Original Contract Amount: $ 4,533,321.00 Final Contract Amount: $ 4,597,863.50
Client: City of Coconut Creek Contact: Brian Rosen, Project Supervisor
Telephone: (954) 973-6780 Email: brosen@coconutcreek.net
FIRMS EXPERIENCE AND QUALIFICATIONS
8 | P a g e
10. SULLIVAN PARK – (January 2017) New Development
Scope of Work: The work will include but not be
limited to clearing, demolition, installation of
drainage system, curbing, sidewalks, road & parking
reconstruction, landscaping, lighting, paving,
playground equipment, 5,000 SF water play feature,
boat dock, restroom building, and stair tower,
relocation of the water mains and other construction
services with the exception of the removal and
undergrounding of FPL overhead power lines.
One of the most exciting parts of this project was the watching the evolution of an ART project
component that consisted of a handmade tile mosaic assembled by the community led by an local
artist and installed by MBR Construction.
Original Contract Amount: $ 3,790,343.00 Final Contract Amount: $ 3,760,634.83
Client: City of Deerfield Beach Contact: Mark DiMascio, Project Manager
Telephone: 954-952-0221 Email: MDiMascio@deerfield-beach.com
Tab 3 - Staffing
ORGANIZATIONAL CHART of the MBR CONSTRUCTION'S KEY PERSONNEL
ACCOUNTING PROPOSER
Wendy S. Cole MBR CONSTRUCTION
Office Accountant / Office Manager Michael R. Boss, President
Andrew Boss Principal in Charge ESTIMATING/PURCHASING
Cost control analyst Edward Broccoli
Senior Estimator
CONSTRUCTION MANAGEMENT PROJECT MANAGEMENT Tom Koch
Construction Manager Thaddeus L. Cohen, PA Estimator
Leon Woloch Project Management Director Federica Douaihi
Jason Cameron Estimator/Purchasing Agent
Site Work Superintendents Jesus Rodriguez
Aran Castillo PROJECT MANAGENT Assistant Project Manager
Eric Boss Vilma Rodriguez, Civil Engineer
Landscaping / Irrigation Division Senior Project Manager ADMINISTRATIVE ASSISTANTS
Leslie Zayas, Landscaping Manager Federica Douaihi Jesus Rodriguez
Armando Castro, Irrigation Manager Senior Project Manager Assistant Project Manager
Superintendents Dannielle Devore Paola A. Koch
Phil Kemp Senior Project Manager Administrative Assistant
Waldemar Douaihi Claudia Felice Oseias Sousa
Rob Kawalawski Senior Project Manager Administrative Assistant
Underground Division Yaesolji Shin
Rohan Fray Junior Project Manager
ITB 24-07-01 Intracoastal Sports Park
MICHAEL R. BOSS
PRINCIPAL IN CHARGE
1020 NW 51ST Street, Fort
Lauderdale, FL 33309 (954) 486-8404 mboss@mbrconstruction.com
OVERVIEW
Michael Boss is President and one of the founders of MBR Construction. He has an extensive
background in construction, with over 35 years’ experience in South Florida and is currently the Principal
in Charge and a licensed General Contractor for MBR Construction.
Although Michael oversees a team of very highly qualified project managers, he has always been a
“hands on” owner and will be the Project Manager and point of contact on this project. Michael’s main
priority on this project will be to maintain a tight schedule, and that throughout the project construction
phase, the Utilities Department staff and operations are minimally impacted by the construction
activities.
Among his many qualifications, it is relevant to mention his extensive experience in leading our team in
the coordination and completion of numerous Design Build Projects. Michael has a proven talent for
working through the many levels of details necessary for a construction project’s success and will give
you an unswerving dedication to service and honesty.
EXPERIENCE
2012 to 2013
2018
2018
1998 to 2020
2002 ‐2013
Village of Wellington
$3.4 million Boys and Girls Club Building
City of Deerfield Beach
$1.6 Cove Gardens Neighborhood Improvements
$3.8 million Sullivan Park (New development)
City of Coconut Creek
$4.6 million Windmill Park Improvements
Broward County Parks & Recreation Division
$10 million Everglades Holiday Park Improvements
$2 million Design Build Sunview and Tree Tops Park Improvements.
$7 million Design Build Long Key Nature Center and Maintenance
Building (new development)
$10 million Design Build District 2 Renovations for Quiet Waters Park,
Tradewinds Park, North Broward Park and Deerfield Island
$3 million Design Build Miramar Pinelands Natural Area (new
development)
$7 million Vista View Park Expansion (New development)
City of Plantation
Design Build Deicke Auditorium Building Renovations.
2009 to 2020
2000 to 2020
2000 to 2015
2017‐2018
2000 to 2015
2000 to 2015
2000 to 2015
City of Pompano Beach
$4.1 million Pompano Community Park Fazes II
$2.6 million Pompano Community phase III
Various park improvements to Mitchell Moore Park, Cresthaven Park
Improvements, Golf Course Shelter & Restroom Renovations.
$1.6 million CM@Risk services for Palm Aire Park
$1.4 million new construction of Ali Cultural Center
$1 million new construction of ETA NU Education Facility
City of Sunrise
$6.5 million Sunrise City Park Improvements
$5 million Flamingo Park Improvements
$5 million Sunrise Village Multipupose Center
$4.2 million Construction services for Cypress Preserve and Oak
Hammock Passive Parks to build two new passive park sites.
Shotgun Road and Panther Parkway Linear Park, Sunset Strip Façade,
Sunrise Roller Hockey Complex, Oakland Park Streetscape
Improvements, Sunrise Lakes Entry Features, Sunrise Civic Center
Family Pool, Sunset Strip Neighborhood Park, Pine Island Streetscape,
Spring Tree Utility Complex.
City of Fort Lauderdale
$1.7 million 15thStreet Boat Launch and Marine Complex
Harbor Beach Entrances and Roadway Improvements, Lincoln Park,
Sunset Memorial Gardens, NE 33rd Avenue Neighborhood
Improvements, Downtown Helistop Staircase Replacement, George
English Park Administration Building, City Park Garage Rehab,
Riverwalk South Regional Park, Peter Feldman Park, Bill Keith
Preserve Renovations , Fort Lauderdale Beach Park, Harbordale Park,
South Middle River Park, Floyd Hull Stadium Facility Improvements,
Flagler Greenway Trail, Southside School Redesign –South Esteriors.
City of Delray Beach
$2.3 million Delray Beach Master Plan Phase 1
$3.3 million Delray Beach Master Plan Phase 2
City of Dania Beach
$1.6 million Revitalization of Ocean Park ‐ Phase I
City of Weston
$2.3 million Indian Trace Park Improvements
$1.9 million Peace Mound Park Improvements
City of Cooper City
$5.2million Flamingo West Park
VILMA RODRIGUEZ
PROJECT MANAGER
1020 NW 51ST Street, Fort
Lauderdale, FL 33309 (954) 486-8404 mboss@mbrconstruction.com
OVERVIEW
Ms. Rodriguez has twenty‐five years’ experience as a project manager 17 of them with MBR
Construction, Inc. as a Project manager for numerous recreational, athletic facility projects. As the
project manager she is the primary client liaison, during phase 1 Vilma will coordinate the construction
documents with the existing site conditions, will coordinate with MBR Construction, Inc.
estimating/value engineering team to provide a GMP and cost estimates/value engineering suggestions
at various phases of the design process, will be part of the design reviews and during the permitting
phase of your project will ensure the process moves without a glitch, carefully reviewing documents
before submittal. Ms. Rodriguez is very experienced with the permitting process and agency reviews.
Once the Sub‐contracts are issued, she is responsible for managing all the subcontractor’s contracts, the
flow of all payments applications and related paperwork from sub‐contractors, sub‐consultants and
client, gathering the required documentation for the project and reviews its compliance.
During the construction phase, she will be responsible for keeping a file and maintaining the flow of all
project records, including as‐builts, construction testing reports, inspection logs, and weekly reports,
and ensuring that they are kept up to date by the project superintendent. Vilma is also responsible for
schedule controls by maintaining schedules up to date, ensuring timelines of the shop drawings
submittal process, keeping all logs and meeting minutes updated, managing the flow of all RFI’s, and
correspondence between MBR Construction and client, sub‐contractors and sub‐consultants.
During the final stage of the project she will be responsible for putting together a complete close out
package that includes all projects operational and maintenance manuals, warranties, Architectural and
Civil As‐builts, final survey, final inspection reports, and certificate of occupancy.
EXPERIENCE
2012 to 2013
2007‐2020
Village of Wellington
$3.4 million Boys and Girls Club Building
Broward County Parks & Recreation Division
Vilma Rodriguez has managed the Master Agreement Park
Improvements and Construction Continuing Contract held by MBR
Construction for the past 9 years.
$2 million Design Build Sunview and Tree Tops Park Improvements.
$7 million Design Build Long Key Nature Center and Maintenance
Building (new development)
$10 million Design Build District 2 Renovations for Quiet Waters Park,
Tradewinds Park, North Broward Park and Deerfield Island
$3 million Design Build Miramar Pinelands Natural Area (new
development)
$7 million Vista View Park Expansion (New development)
2018
2013‐2015
2002 ‐2013
2009 to 2020
2000 to 2015
2000 to 2015
2019
2008‐2018
City of Coconut Creek
$4.6 million Windmill Park Improvements
City of Plantation
Design Build Deicke Auditorium Building Renovations.
$2.1 million Energy Efficiency Team Center
City of Pompano Beach
$4.1 million Pompano Community Park II
$2.6 million Pompano Community phase III
$1.6 million CM@Risk services for Palm Aire Park
City of Sunrise
$6.5 million Sunrise City Park Improvements
$5 million Flamingo Park Improvements
$5 million Sunrise Village Multipupose Center
$4.2 million Construction services for Cypress Preserve and Oak
Hammock Passive Parks to build two new passive park sites.
$1.6 millionSpring Tree Utility Complex.
$2 million Civic Center Family Pool
City of Fort Lauderdale
Harbor Beach Entrances and Roadway Improvements
Sunset Memorial Gardens
NE 33rd Avenue Neighborhood
Riverwalk South Regional Park
Fort Lauderdale Beach Park, Harbordale Park, South Middle River P
City of Wilton Manors
$7.3 million Design Build City Hall and Police Station,
$1.6 million Design Build Richardson Historic Park
City of Tamarac
$4.1 million Design Build Services Waters Edge Park
Broward County Sheriff’s Office
$4 million CM@Risk services for North Broward Jail Improvement
Detention Renovations
Continuing Design Build Services for Broward Sheriff’s Office
include projects ranging from $0 to $500,000 budgets: Juvenile
Assessment Center Renovation, Pompano Jail Renovations,
Headquarters Building Renovations, Internal Affairs Bureau
Renovations, Tactical Training Center Renovations, Main Jail ADA
Elevator Addition and Cooper City Sub‐station Renovations.
LEON WOLOCH
CONSTRUCTION MANAGER
1020 NW 51ST Street,
Fort Lauderdale, FL
33309
(954) 486-8404 lwoloch@mbrconstruction.com
OVERVIEW
Leon Woloch is one of our most valued Construction Managers. He has an extensive background in
construction with over 25 years experience in South Florida and 15 years working for MBR Construction,
Inc.
Before working for MBR Construction, Leon worked as one of the superintendents working to construct
the Sawgrass Mills, and he also completed three new bank buildings for the First America Bank.
The bulk of his experience with MBR Construction has been a combination of Design Bid Build and Design
Build Services and his skills, his hands on approach and his firsthand knowledge of construction have made
all his projects successful ones.
Mr. Woloch takes pride in his ability to control the quality of the work and puts high priority on the
project schedule. Job safety is also high on his list of priorities, and he maintains weekly construction
safety training meetings.
Another one of his many good qualities is the cleanliness of his job site and this is one that most clients
notice and praise.
EXPERIENCE
2012 to 2013
2005 to 2020
2013
2000 to 2019
Village of Wellington
$3.4 million Boys and Girls Club Building
Broward County Parks & Recreation Division
$10 million Everglades Holiday Park Improvements
$7 million Design Build Long Key Nature Center and Maintenance
Building (new development)
$10 million Design Build District 2 Renovations for Quiet Waters Park,
Tradewinds Park, North Broward Park and Deerfield Island
City of Plantation
Design Build Deicke Auditorium Building Renovations.
City of Sunrise
$5 million Flamingo Park Improvements
$5 million Sunrise Village Multipupose Center
$4.2 million Construction services for Cypress Preserve and Oak
Hammock Passive Parks to build two new passive park sites.
Pine Island Streetscape, Spring Tree Utility Complex.
2000 to 2015
2017
2015
2015
2018‐2019
City of Fort Lauderdale
$1.7 million 15thStreet Boat Launch and Marine Complex
Downtown Helistop Staircase Replacement
City Park Garage Rehab
Southside School Redesign
City of Dania Beach
$1.6 million Revitalization of Ocean Park ‐ Phase I
Broward Health
$2 million CHS Healthcare for the Homeless Clinic (14,000 SF new
construction) and CHS Specialty Care Center Interior Renovations.
City of Wilton Manors
$7.3 million Design Build Wilton Manors City Hall & Police station
(35,000 SF new constructions)
City of Tamarac
$4.1 million Design Build Waters Edge Park
Major Construction Projects in progress/contract
Scheduled
Project Owner Owner's Rep Type Phone Title Architect Contract $% Completed
Completion
Date
Huizinga Park Renovations Fort Laud. DDA Alex Saiz Park/Structure 954-888-6002 Planning & Program Mgr.Stiles Architectural Group 9,207,855$ 1%Oct-25
Hollywood North Beach Mooring Fields Broward County Martin Gross Park/Marine 954-577-4646 Project Engineer Thompson and Associates 5,926,000$ 1%May-25
Sunrise Veterans Park (Takeover)Sunrise Earl Prizlee Park 954-888-6002 Project Manager Saltz Michelson 2,259,839$ 99%Aug-24
CB Smith Aquatics Building Broward County Kevin Bacheda Structure 954.357.8146 Project Manager Synalovski Romanin 1,162,676$ 30%Jan-25
Village Art Plaza Sunrise Fernando Pleitez Streetscape 954-789-8523 Project Manager Kimley Horn 3,692,571$ 95%Sep-24
Johnnie L Tigner Community Center (Design Build)Deerfield Beach Priscilla Cygielnik Structure 954-616-1746 City Engineer Walters Zackeria 10,242,046$ 95%Sep-24
Spring Valley / Armstrong Park (Design Build)Pembroke Pines Christina Sorensen Park/Structure 954-392-2130 Asst. City Manager Walters Zackeria 4,893,000$ 50%Dec-24
Major Construction Projects completed
Project Owner Owner's Rep Type Phone Title Architect Contract $Budget
Completion
date
Boca Raton Congress & Clint Moore Roadway Boca Raton Curtis Cahoon Streetscape 561-416-3424 Project Manager Boca Raton 1,164,096$ Yes Aug-24
Caporella Park (Design Build)Tamarac Dibb Machuca Park/Structure 954-597-3725 Capital Projects Manager Walters Zackeria 4,438,000$ Yes Dec-23
Serino Park (Design Build Margate Mike Jones Park/Structure 954-972-6458 Director of Parks and Rec.Walters Zackeria 1,927,792$ Yes Nov-23
Tamarac Buffer Wall Phase VI Tamarac Alan Lam Sound Wall 954-597-3707 Project Engineer Stantec 1,499,483$ Yes Nov-23
TY Park Reclaimed Irrigation Broward County Michael Halupke Irrigation 954-577-4637 Project Manager Thompson & Associates 1,959,840$ Yes May-23
Sunrise Athletic Complex Sunrise Chris Ulrich Park/Structure 954-888-6060 Projects Manager Saltz Michelson 14,778,944$ Yes Feb-23
CMAR Anne Gillis Urban Plaza Pompano Beach Horacio Danovich Park 954-980-2208 Project Manager Cartaya and Associates 1,396,763$ Yes Dec-22
Welleby Park (Takeover)Sunrise Errol Prezlie Park 954-888-6002 Projects Coordinator Kimley Horn 1,998,368$ Yes Sep-22
Vinson Park (Design Build)Margate Mike Jones Park/Structure 954-972-6458 Dir of Parks and Rec Walters Zackeria 2,008,852$ Yes Apr-22
Everglades Holiday Park Broward County Martin Gross Park/Structure/Marine 954-577-4646 Project Engineer Keith and Associates 11,926,727$ Yes Mar-22
Beach Master Plan Phase 2 Delray Beach Isaac Kovner Beach Fencing/Lighting/Roadway/Site
Furnishings
561-243-7341 Principal Engineer EDSA 2,492,000$ Yes Dec-19
Beach Master Plan Phase 1 Delray Beach Isaac Kovner Beach Sidewalk/Showers/Fountains/Site
furnishings
561-243-7341 Principal Engineer EDSA 2,348,000$ Yes Oct-17
REFERENCES & PROJECTS
Tab 4 – Approach / Methodology
General Approach: We understand the importance of providing a single point of contact to
achieve a clear communication channel with our client and ensure the success of the project.
Our Project Manager will be reachable at any time by phone or electronic mail.
Before MBR Construction, Inc. starts a Guaranteed Maximum Price has already been
determined. All team members will be coordinated by the lead Project Manager. On a weekly
basis, the Project Manager and team members review the project development against the plan
presented at the beginning of the project. The technical quality of the work is reviewed at three
intervals. The emphasis of these reviews is to ensure the construction documents adhere to the
contract documents, stay within the budget price, and to coordinate with the associated
disciplines to satisfy the program requirements. The team’s cost estimator reviews the
documents with emphasis on clarity of details and drawing comprehensiveness. In addition,
they make recommendations on construction techniques utilizing proven cost-effective systems
to maintain the GPM established originally.
Pre-Design Phase
Scheduling
The most important tool for the success of a Project is the Job schedule.
MBR uses Microsoft Projects to generate schedules on all projects. At the start of the project
the Owner, architect and MBR will determine the level of scheduling detail that is necessary for
the project. Our Project Manager will be responsible for updating the schedule in a timely
manner.
The main objective of a schedule is to develop a well defined, realistic flow of work activities
Design Phase
During this phase MBR will play a key role in assisting the design team to achieve a cost-
effective, high-quality design that will meet the Client’s program. This goal is achieved through
design reviews at various stages. Also, during this phase MBR will provide estimating,
scheduling, and will identify long lead items to prevent delays.
MBR will develop a Guaranteed Maximum Price based on a complete set of design documents
Coordination of Team Members/Subcontractors
All team members will be coordinated by the lead Project Manager. On a weekly basis, the
Project Manager and team members review the project development against the plan
presented at the beginning of the project. The technical quality of the work is reviewed at three
intervals. The emphasis of these reviews is to ensure the construction documents adhere to the
contract documents, stay within the budget price, and to coordinate with the associated
disciplines to satisfy the program requirements. The team’s cost estimator reviews the
documents with emphasis on clarity of details and drawing comprehensiveness. In addition,
they make recommendations on construction techniques utilizing proven cost-effective systems
Project meetings
During the design phase, MBR will conduct progress meetings and generate reports of these
meetings to ensure that critical design submittals dates are met.
APPROACH / METHODOLOGY
Cost Estimating
MBR uses a customized estimating program, our estimating team is lead by one of MBR’s
Principals Ronald R. Boss with over 30 years experience to provide you with a complete and
accurate GMP and we will allocate Federica Douaihi to working specifically on your project and
she will be directly responsible for preparing, testing in the marketplace, explaining, and
defending the estimates.
MBR performs take-offs from drawings, analyses bid and consults with knowledgeable
subcontractors and develops estimates at various design phases. These will include system
analysis and an examination of the relationship between elements.
This process is an open book to be reviewed by the Owner, Architect and Contractor’s team.
Value Engineering
Value Engineering can be defined as the process of relating the functions, the quality, and the
costs of the project in the determination of optimum solutions for the project.
Typically, we apply the procedures of value engineering during the Design Development phases
by a multidisciplinary study team that:
Gathers information
Performs Function analysis
Develops Fast diagrams
Generates ideas
Evaluate ideas
Chose best idea
At a presentation meeting attended by VE team and owner and/or owner’s representative we:
- Present idea
A building project and its costs are determined by several factors. Including its functions and
purposes, its aesthetic appeal, its profitability, the owner’s needs, the performance
specifications of its architectural and engineering systems, the construction method and
completion time, and its maintenance.
In applying value engineering to a building project, the multidisciplinary team obtains a solution
that emphasizes the functions of the project and the best judgment of the team in making final
choices, and which results in a cost-effective design for the project.
The factors that determine a building project and its costs can be separated into two groups:
one consisting of factors related to specific engineering systems and the other of factors that
are general in character and relate to the whole building.
Bidding and Award Phase
The following are steps followed before awarding all contracts:
Select from our list of pre-qualified sub-contractors includes Small Disadvantaged
Businesses to bid each portion of the project
Advertise to Small Disadvantaged Businesses and Pompano’s local businesses.
Prepare bid packages for each function
Schedule pre-bid conferences as required
Obtain bids
Analyze bids
Meet with client to present our findings and obtain their approvals
APPROACH / METHODOLOGY
Negotiate Sub-Contract terms and Project Site rules
Obtain bonds from all major subcontractors
Obtain copies of all up-to-date licenses and insurances.
Award Contracts
Construction Phase
Construction Scheduling
The principal objective of construction scheduling is to efficiently manage the resources used in
the construction process. These resources include labor and supervision, material and supplies,
equipment, general condition or jobsite overhead support items, and subcontractors (including
material suppliers). The objective of the management effort is to effectively use the resources
to accomplish the project and its individual activities within the budgeted cost.
The Construction schedule provides the principal measuring tool for evaluating progress.
Circumstances and situations encountered in the construction process will affect the work that
remains. An accurate updated schedule allows the contractor to identify and evaluate
alternative plans in responding to the changes in project conditions that will result in the best
project decision.
Shop Drawing Process
The timeliness of shop drawing submittal and the follow-up of timely approvals is critical for the
scheduling flow. The goal is to ensure that all materials and equipment are available when the
work for which they are required is schedule to happen.
At the start of the Project MBR produces a list of shop drawings which require approval.
For each item we take into consideration the following:
How long it takes the subcontractor to prepare shop drawings
Delivery dates required for the item
How long will the architect need to review the shop drawing
What is the lead time
Once this information is gathered, we prepare a shop drawing schedule. Each subcontractor is
required by contract to adhere to the shop drawing schedule.
Monitoring and reporting
Monitoring the progress of individual activities according to the construction schedule and
promptly adjusting to changing conditions means maximum savings for the owner.
MBR can make good decisions because the project manager will have good and timely
information available. This system of reviewing and recording the cost and production of
individual activities and chains of activities usually results in good control of construction time
and costs.
Project close-out and transition to occupancy
In this phase MBR is responsible for the Project Quality control, Cost control, Communications
with subcontractor, Budget and schedule control, Project communications, Construction
document maintenance, Punchlist preparation and Project closeout
APPROACH / METHODOLOGY
Warranties
In this phase MBR obtains and review all warranties, operations, and maintenance manuals and
any other such documents, have them corrected as required.
Warranty Phase
The duration of this phase is one year from the date of owner occupancy.
During this phase MBR will:
Coordinate and supervise the completion of all warranty work
Conduct warranty inspections and provide reports at 6th and 11th month of occupancy
Provide Owner with As-built drawings
Provide owner all warranties and guaranties
Substantiation
Project meetings: During design stage there will be meetings with the client after every
submittal stage to review their comments and the construction phase, MBR will conduct weekly
progress meetings and generate written reports of these meetings
Design Stage Meeting Minutes: These reports will specify the date of the meeting, list of
attendees and a record of items discussed during the meeting to be noted or resolved. These
Issues will be addressed and incorporated in the next submittal.
Construction Stage Meeting Minutes: These reports will specify the date of the meeting, list
of attendees and a record of items discussed during the meeting to be noted or resolved. Items
to be resolved remain in the meeting minutes as old business until resolved.
RFI: All requests for information will be issued to the client’s rep in writing, even those asked
during project meetings will be followed up in writing.
Logs are a solution to keep a record of:
Shop drawing submittals enable us to monitor and prevent any delays of long lead items and
allows the client to review and determine that the requirements are met.
Change orders requested by the client if additional work is required.
RFI specifying which RFI’s have been answered and which are pending. Date issued and date
responded.
APPROACH / METHODOLOGY
Tab 5 – Corporate Standing and Authorized
Signatory
Tab 6 – Litigation History
Tab 7 – Forms and Attachments
1020 NW 51 STREET
FORT LAUDERDALE, FL 33309
Current Principal Place of Business:
Current Mailing Address:
1020 NW 51 STREET
FORT LAUDERDALE, FL 33309 US
Entity Name: MBR CONSTRUCTION, INC.
DOCUMENT# P92000004585
FEI Number: 65-0373938 Certificate of Status Desired:
Name and Address of Current Registered Agent:
BOSS, MICHAEL R
1020 NW 51 STREET
FT. LAUDERDALE, FL 33309 US
The above named entity submits this statement for the purpose of changing its registered office or registered agent, or both, in the State of Florida.
SIGNATURE:
Electronic Signature of Registered Agent Date
Officer/Director Detail :
I hereby certify that the information indicated on this report or supplemental report is true and accurate and that my electronic signature shall have the same legal effect as if made under
oath; that I am an officer or director of the corporation or the receiver or trustee empowered to execute this report as required by Chapter 607, Florida Statutes; and that my name appears
above, or on an attachment with all other like empowered.
SIGNATURE:
Electronic Signature of Signing Officer/Director Detail Date
MICHAEL BOSS
FILED
Feb 08, 2024
Secretary of State
9258462728CC
WENDY COLE-BROCCOLI SEC 02/08/2024
2024 FLORIDA PROFIT CORPORATION ANNUAL REPORT
Yes
02/08/2024
Title DP
Name BOSS, MICHAEL
Address 1020 NW 51 STREET
City-State-Zip:FORT LAUDERDALE FL 33309
Title SECRETARY
Name COLE-BROCCOLI, WENDY
Address 1020 NW 51 STREET
City-State-Zip:FORT LAUDERDALE FL 33309
Tab 8 – Bid Price Sheet
ITEM #ITEM UNIT UNIT COST
1 Mobilization LS $ 123,866.00
2 Maintenance of Traffic LS $ 7,140.00
3 Construction Surveying/As-builts LS $ 23,460.00
4 Construction Testing LS $ 2,600.00
5 Bonds & Insurance LS $ 122,450.00
6 Permit Fee LS
7 Overhead and Profit LS $ 487,629.00
ITEM #ITEM UNIT UNIT COST
8 Site clearing (sod, landscape, tree removal)LS $ 149,575.00
9 F&I Control Structure EA $ 8,308.00
10 Miscellaneous site work and underground utilities LS $ 35,700.00
11 Building pad grading LS $ 51,000.00
12 F&I Drainage Well EA $ 138,399.00
13 F&I Drainage Structures (Manhole)EA $ 8,308.00
14 F&I Drainage Structure (Yard Drain)EA $ 5,466.00
15 F&I Drainage Well 15-inch HDPE LF $ 61.20
16 F&I Drainage Well 12-inch HDPE LF $ 58.14
17 F&I Exfiltration Trench CY $ 262.66
18 F&I Sidewalk SY $ 70.18
19 F&I Type 'D' Curb LF $ 50.95
20 F&I Asphalt (Parking Lot & Tennis Courts)SY $ 58.98
21 Storm Pollution Prevention Measures LS $ 5,424.00
22 Regular Excavation (Cut)CY $ 110.00
ITEM #ITEM UNIT UNIT COST
23 F&I 2" Water Service HDPE LF $ 83.00
24 F&I 2" Irrigation Line and RPZ LS $ 14,051.00
25 2" BFP EA $ 5,610.00
26 F&I 6" Sewer line PVC LF $ 218.00
27 Cleanout EA $ 434.00
ITEM #ITEM UNIT UNIT COST
28 F&I Pavement Markings & Signage LS $ 7,803.00
ITEM #ITEM UNIT UNIT COST
29 Marble Chip/Shell Aggregate, Standard Grey Concrete, 4" thickness SF $ 7.98
30 Style "B" Concrete Paver, 8"x8", Camel Shell Stone SF $ 16.39
31 Style "C" Concrete Paver, 4"x8", Camel Shell Stone SF $ 16.39
32 Bench: Landscape Forms-Parc Vue, Backless, 72"L x 22"W x 18"H EA $ 2,147.00
33 Litter Receptacle: Uline-model: H-7234BL(Terrace Trash Can), 32gal, 26"L x 28"W x
38"H EA $ 1,314.00
34 Bike Rack: Landscape Forms-Ride, 4"W x 28"L x 26"H EA $ 1,045.00
35 10'HT Court Fencing, Black Vinyl Coated Chain Link, Windscreen LF $ 72.40
36 Court Cabana Shade Structure, 2 post-black powdercoated frame, shade fabric, 96"L x 72"W
EA $ 16,332.00
37 Tubular Barrier Gates for Entry Drive, Hoover Fence Co-"S" Series, Double gate, 24' overall Length
EA $ 4,284.00
38 Retaining Wall Linear Footage LF $ 129.54
39 Heavy Duty Basketball Goal/Backboard: Sports Play, Inc., Bent Post, 4-1/2" Gal Steel Post, 72" x 48"
Acrylic Backboard EA $ 7,140.00
40 Tennis/Multi-Court Surfacing: Sportsmaster Sports Surfacing, standard court system on
Asphalt SF $ 1.51
ITEM #ITEM UNIT UNIT COST
41 Bursera simaruba - Gumbo Limbo EA $ 915.00
ITB 24-07-02 Intracoastal Sports Court Complex - City of Sunny Isles Beach, FL
BID PRICE SHEET - ADDENDUM # 3 PRICE SHEET - BIDDER'S MUST USE THIS PRICE SHEET
GENERAL CONDITIONS
QTY TOTAL
1 $ 123,866.00
1 $ 7,140.00
1 $ 23,460.00
1 $ 2,600.00
1 $ 122,450.00
1 $ 10,000.00
1 $ 487,629.00
General Conditions Subtotal $ 777,145.00
PAVING, GRADING AND DRAINAGE
QTY TOTAL
1 $ 149,575.00
1 $ 8,308.00
1 $ 35,700.00
1 $ 51,000.00
1 $ 138,399.00
2 $ 16,616.00
3 $ 16,398.00
447 $ 27,356.40
56 $ 3,255.84
219 $ 57,522.54
341 $ 23,931.38
345 $ 17,577.75
1740 $ 102,625.20
1 $ 5,424.00
464 $ 51,040.00
Paving, Grading and Drainage Subtotal $ 704,729.11
WATER AND SEWER
QTY TOTAL
122 $ 10,126.00
1 $ 14,051.00
1 $ 5,610.00
106 $ 23,108.00
4 $ 1,736.00
Water and Sewer Subtotal $ 54,631.00
PAVEMENT MARKING
QTY TOTAL
1 $ 7,803.00
Pavement Marking Subtotal $ 7,803.00
HARDSCAPE
QTY TOTAL
4,821 $ 38,471.58
983 $ 16,111.37
240 $ 3,933.60
3 $ 6,441.00
3
$ 3,942.00
2 $ 2,090.00
534 $ 38,661.60
1
$ 16,332.00
1
$ 4,284.00
442 $ 57,256.68
2
$ 14,280.00
12,084
$ 18,246.84
Hardscape Subtotal $ 220,050.67
LANDSCAPE
QTY TOTAL
TREES
7 $ 6,405.00
42 Conocarpus erectus - Green Buttonwood EA $ 730.00
43 Simaruba glauca - Paradise Tree EA $ 839.00
44 Phoenix dactylifera - date palm: matching EA $ 5,772.00
45 Sabal palmetto - Cabbage Palm EA $ 839.00
46 Satakentia liukiuensis - Satake Palm EA $ 2,389.00
47 Veitchia montgomeryana - Montgomery Palm EA $ 1,276.00
48 Brunfelsia grandiflora - Yesterday, Today & Tomorrow EA $ 42.00
49 Chrysobalanus icaco "Horizontalis" - Horozontal Cocoplum EA $ 42.00
50 Chrysobalanus icaco "Red Tip" - Red Tip Cocoplum EA $ 31.00
51 Conocarpus erectus - Green Buttonwood EA $ 31.00
52 Ficus microcarpa "Green Island" - Green Island Ficus EA $ 12.00
53 Pennisetum setaceum "Alba" - White Fountain Grass EA $ 11.00
54 Zamia pumilla - Coontie EA $ 34.00
55 Stenotaphrum secundastum - St. Augustine Grass SF $ 0.70
56 Planting Soil (6" depth)CY $ 39.00
57 Mulch (3" depth)CY $ 83.00
ITEM #ITEM UNIT UNIT COST
58 Irrigation spray heads, nozzles, swing joints, & fittings EA $ 38.37
59 Bubblers, swing joints, & fittings EA $ 23.36
60 Rotors, swing joints, & fittings EA $ 28.91
61 Zone valve assembly & valve box EA $ 436.56
62 Controller EA $ 1,812.54
63 Lateral pipe LF $ 7.00
64 Mainline LF $ 13.26
65 Sleeves LF $ 8.26
ITEM #ITEM UNIT UNIT COST
66 Tennis Court Sports Lighting LS $ 268,008.00
67 Parking lot & site light poles, underground feeders, & lighting controls LS $ 115,843.00
6 $ 4,380.00
7 $ 5,873.00
PALMS
2 $ 11,544.00
2 $ 1,678.00
14 $ 33,446.00
4 $ 5,104.00
SHRUBS
39 $ 1,638.00
48 $ 2,016.00
105 $ 3,255.00
26 $ 806.00
962 $ 11,544.00
188 $ 2,068.00
80 $ 2,720.00
8,000 $ 5,600.00
SOIL AND MULCH
144 $ 5,616.00
33 $ 2,739.00
Landscape Subtotal $ 106,432.00
IRRIGATION
QTY TOTAL
54 $ 2,071.98
43 $ 1,004.48
46 $ 1,329.86
7 $ 3,055.92
1 $ 1,812.54
3,207 $ 22,449.00
340 $ 4,508.40
80 $ 660.80
Irrigation Subtotal $ 36,892.98
SITE LIGHTING & ELECTRICAL
QTY TOTAL
1 $ 268,008.00
1 $ 115,843.00
Site Lighting & Electrical Subtotal $ 383,851.00
SITE WORK GRAND SUB-TOTAL LINES 1-67:
$ 2,291,534.76
NOTES:
1. Quantieis were calculated based on construction document plan set dated 7/03/2024.
ITEM #UNIT UNIT COST
1.00 SPECIALTY EQUIPMENT
1.01 Not used
2.00 EXISTING CONDITIONS/SITEWORK
2.01 Not used
ITEM #UNIT UNIT COST
3.00 CONCRETE
3.01 Concrete floor slab LS $ 11,857.00
3.02 Concrete beams LS $ 92,672.00
3.03 Concrete wall reinforcement / filled cells LS $ 26,815.00
3.04 Concrete footings LS $ 66,469.00
4.00 MASONRY
4.01 Masonry walls - 8" thick LS $ 10,675.00
5.00 METALS
5.01 Aluminum wall siding LS $ 37,791.00
5.02 Vertical aluminum battens LS $ 152,381.00
5.03 Aluminum suspended ceiling panels LS $ 30,600.00
6.00 WOOD, PLASTICS & COMPOSITES
6.01 Millwork LS $ 15,300.00
6.02 Misc. rough carpentry LS $ 100.00
7.00 THERMAL & MOISTURE PROTECTION
7.01 Roofing and LWC - including all accessories LS $ 36,000.00
7.02 Insulation - walls LS $ 5,100.00
7.03 Firestopping and smoke sealing LS $ 600.00
7.04 Weather Resistant Barrier LS $ 3,775.00
7.05 Joint sealant LS $ 250.00
8.00 OPENINGS
8.01 Storefront system LS $ 27,477.00
8.02 New single doors - metal w/ hollow metal frame (36" x 84")LS $ 9,732.00
8.03 New double doors - metal w/ hollow metal frame (60" x 84")LS $ 3,243.00
8.04 Pass-thru window LS $ 2,700.00
9.00 FINISHES
9.01 Interior plaster/stucco (includes lath)LS $ 5,712.00
9.02 Epoxy painting (restroom flooring)LS $ 3,427.00
9.03 Architectural finishes / GWB and tile accessories LS $ 2,600.00
9.04 New exterior stucco (5/8" min.)LS $ 9,078.00
9.05 Exterior painting (WRB coat)LS $ 6,022.00
9.06 Interior painting LS $ 6,022.00
9.07 5/8" gypsum board wall and ceiling finish LS $ 4,900.00
9.08 1/2" Densglass sheathing LS $ 2,100.00
9.09 Wall tile - restrooms LS $ 14,469.00
9.10 Suspended acoustical ceiling tile LS $ 2,754.00
9.11 Framing LS $ 1,500.00
9.12 Stone wall finish LS $ 5,141.00
9.13 VCT Flooring LS $ 2,652.00
10.00 SPECIALTIES
10.01 Acess panels LS $ 306.00
10.02 Toilet room accessories (allowance)LS $ 5,050.00
10.03 Room ID signs LS $ 510.00
10.04 Fire extinguishers LS $ 255.00
10.05 Sunshade LS $ 52,020.00
10.06 Building sign (by City)
11.00 EQUIPMENT
SITE RELATED SCOPE
QTY TOTAL
SUBTOTAL $
SUBTOTAL $
INTRACOASTAL COURTSPORTS BUILDING
QTY TOTAL
1 $ 11,857.00
1 $ 92,672.00
1 $ 26,815.00
1 $ 66,469.00
CONCRETE SUBTOTAL $ 197,813.00
1 $ 10,675.00
MASONRY SUBTOTAL $ 10,675.00
1 $ 37,791.00
1 $ 152,381.00
1 $ 30,600.00
METALS SUBTOTAL $ 220,772.00
1 $ 15,300.00
1 $ 100.00
WOOD, PLASTICS & COMPOSITES SUBTOTAL $ 15,400.00
1 $ 36,000.00
1 $ 5,100.00
1 $ 600.00
1 $ 3,775.00
1 $ 250.00
THERMAL & MOISTURE PROTECTION SUBTOTAL $ 45,725.00
1 $ 27,477.00
1 $ 9,732.00
1 $ 3,243.00
1 $ 2,700.00
OPENINGS SUBTOTAL $ 43,152.00
1 $ 5,712.00
1 $ 3,427.00
1 $ 2,600.00
1 $ 9,078.00
1 $ 6,022.00
1 $ 6,022.00
1 $ 4,900.00
1 $ 2,100.00
1 $ 14,469.00
1 $ 2,754.00
1 $ 1,500.00
1 $ 5,141.00
1 $ 2,652.00
FINISHES SUBTOTAL $ 66,377.00
1 $ 306.00
1 $ 5,050.00
1 $ 510.00
1 $ 255.00
1 $ 52,020.00
SPECIAL TIES SUBTOTAL $ 58,141.00
11.01 Not Used
12.00 FURNISHINGS
12.01 Exterior Furniture LS $ 20,580.00
13.00 SPECIAL CONSTRUCTION
13.01 Security camera infrastructure only (allowance) - does not include cameras LS $ 15,708.00
14.00 CONVEYING
14.01 Not Used
15.00 FIRE SUPPRESSION
15.01 Not Used
15.20 PLUMBING
15.21 Water closets LS $ 1,224.00
15.22 Lavatories LS $ 2,040.00
15.23 Exterior electric drinking fountain LS $ 3,570.00
15.24 Hose bibb LS $ 510.00
15.25 Roof drain & leaders LS $ 9,792.00
15.26 Floor drains LS $ 918.00
15.27 Sanitary, water, storm system LS $ 23,561.00
15.50 HEATING, VENTILATION & AIR CONDITIONING
15.51 Exhaust fans LS $ 5,900.00
15.52 HVAC ductwork/supply diffusers/return grills LS $ 5,450.00
15.53 AHU, controls, VAVs, termination LS $ 16,540.00
16.00 ELECTRICAL
16.01 LED interior lay-in light fixtures (2' X 2')LS $ 8,900.00
16.02 LED interior lay-in light fixtures (2' X 2') - Emergency LS $ 6,490.00
16.03 LED pendant/surface mount light fixtures LS $ 11,310.00
16.04 LED pendant/surface mount light fixtures - Emergency LS $ 10,800.00
16.05 LED exterior linear light fixtures LS $ 10,800.00
16.06 LED exterior wall mounted light fixtures LS $ 9,920.00
16.07 Batt. operated wall mounted emergency lighting LS $ 6,536.00
16.08 Switches LS $ 4,080.00
16.09 Exit signs LS $ 4,492.00
16.10 Receptacles/GFI/WP/Data LS $ 4,080.00
111.01 Panels/switchgear LS $ 18,037.00
111.02 F/A system LS $ 13,581.00
111.03 Lightning protection LS $ 18,054.00
111.04 Electrical underground LS $ 15,300.00
EQUIPMENT SUBTOTAL
1 $ 20,580.00
FURNISHINGS SUBTOTAL $ 20,580.00
1 $ 15,708.00
SPECIAL CONSTRUCTION SUBTOTAL $ 15,708.00
CONVEYING SUBTOTAL
FIRE SUPPRESSION SUBTOTAL
1 $ 1,224.00
1 $ 2,040.00
1 $ 3,570.00
1 $ 510.00
1 $ 9,792.00
1 $ 918.00
1 $ 23,561.00
PLUMBING SUBTOTAL $ 41,615.00
1 $ 5,900.00
1 $ 5,450.00
1 $ 16,540.00
HEATING, VENTILATION & AIR CONDITIONING SUBTOTAL $ 27,890.00
1 $ 8,900.00
1 $ 6,490.00
1 $ 11,310.00
1 $ 10,800.00
1 $ 10,800.00
1 $ 9,920.00
1 $ 6,536.00
1 $ 4,080.00
1 $ 4,492.00
1 $ 4,080.00
1 $ 18,037.00
1 $ 13,581.00
1 $ 18,054.00
1 $ 15,300.00
ELECTRICAL SUBTOTAL: $ 142,380.00
BUILDING COMPLEX GRAND SUB-TOTAL: $ 906,228.00
PROJECT GRAND (BUILDING AND SITE) TOTAL: $ 3,197,762.76
ALTERNATE OPTIONS NOT INCLUDED ABOVE
ALTERNATES SUBTOTAL $
GRAND TOTAL + ALTERNATES $ 3,197,762.76