Loading...
HomeMy WebLinkAboutReso 2024-3755RESOLUTION NO. 2024 - A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, APPROVING A LETTER AGREEMENT WITH KEITH AND ASSOCIATES, INC., d/b/a KEITH, TO PROVIDE CONSTRUCTION ADMINISTRATION SERVICES FOR THE CONSTRUCTION OF THE INTRACOASTAL SPORTS PARK, IN AN AMOUNT NOT TO EXCEED SIXTY-ONE THOUSAND FIVE HUNDRED DOLLARS AND NO CENTS ($61,500.00), ATTACHED HERETO AS EXHIBIT "A"; AUTHORIZING THE MAYOR TO EXECUTE SAID AGREEMENT; AUTHORIZING THE CITY MANAGER TO DO ALL THINGS NECESSARY TO EFFECTUATE THIS RESOLUTION; PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the City of Sunny Isles Beach ("City") is the owner of the property located at 15800 Collins Avenue, known as Intracoastal Sports Park (the "Park"); and WHEREAS, on January 211t, 2021, via Resolution No. 2021-3160, the City Commission of short listed six (6) civil engineering firms, in response to Request for Qualifications No. 20-07-01 for Continuing Professional Services ("RFQ"), pursuant to the Consultants' Competitive Negotiation Act; and WHEREAS, the City requested general civil engineering services as one of several disciplines listed in the RFQ; and WHEREAS, Keith and Associates, Inc., d/b/a/ Keith ("Firm") was one of the six (6) firms short listed to provide general civil engineering services to the City, and entered into a Continuing Services Agreement to provide said Services on an as needed basis; and WHEREAS, the City is in need of a firm to provide the construction administration services (the "Services") for the construction of the Park ("Project"); and WHEREAS, after careful review and consideration, the City Manager has determined that based on relevant experience, qualification, and past performance, the Firm is uniquely positioned to provide the City with the desired Services for the Project; and WHEREAS, the Firm has expressed the ability and desire to provide these Services and has submitted a proposal; and WHEREAS, the City Commission wishes to enter into a Letter Agreement with the Firm to provide the Services for the Project, in an amount not to exceed Sixty -One Thousand Five Hundred Dollars and No Cents ($61,500.00), attached hereto as Exhibit "A". NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF SUNNY ISLES BEACH, FLORIDA, AS FOLLOWS: Section 1. Approval of Letter Agreement. The City Commission hereby approves a Letter Agreement with Keith and Associates, Inc., d/b/a/ Keith to provide the Services for the Project, @BCL@6COBEF96.doc Page 1 of 2 419 in an amount not to exceed Sixty -One Thousand Five Hundred Dollars and No Cents ($61,500.00), attached hereto as Exhibit "A". Section 2. Authorization of Mayor. The Mayor is hereby authorized to execute said Agreement. Section 3. Authorization of City Manager. The City Manager is hereby authorized to do all things necessary to effectuate this Resolution. Section 4. Effective Date. This Resolution shall become effective upon adoption. PASSED AND ADOPTED this 21St day of No4embe , 2024. ATTEST: Mauricib Betancur, CMC, City Clerk Larisa Svechin, Mayor APPROVED AS TO FORM AND LEGAL SUFFICIENCY: AIA� A(in E. Boileau, for Nabors, Giblin & Nickerson, P.A., City Attorney Moved by: /9/ V0/_'0 )/)_SEjW Seconded by: j/fie ®" Lvl�& Vote: Mayor Svechin Vice Mayor Lama Commissioner Joseph Commissioner Stuyvesant Commissioner Viscarra ,(Yes) (No) ✓ Yes) (No) Yes) (No) —(`ies) (Yes) (No) (No) @BCL@6COBEF96.doc Page 2 of 2 420 LETTER AGREEMENT Between THE CITY OF SUNNY ISLES BEACH And KEITH AND ASSOCIATES, INC. D/B/A KEITH For CONSTRUCTION ADMINISTRATION SERVICES INTRACOASTAL SPORTS PARK Pursuant to the provisions contained in the Continuing Services Agreement between the City of Sunny Isles Beach ("City") and Keith and Associates, Inc. d/b/a Keith ("Consultant") for Professional Civil Engineering Services pursuant to Request for Qualifications No. 20-07-01 (hereinafter referred to as "Continuing Services Agreement") dated April 30, 2021, this Letter Agreement authorizes the Consultant to provide the services as set forth below: A. INCORPORATION OF CONTINUING SERVICES AGREEMENT 1. All terms and conditions of the Continuing Services Agreement between the City and the Consultant, not specifically modified by this Letter Agreement shall remain in full force and effect and are incorporated into and made a part of this Agreement by this reference as though set forth in full. B. SCOPE OF SERVICES The Consultant will perform construction administration services, as more particularly set forth and described in EXHIBIT "1," which incorporated herein and made a part hereof. C. TERM AND TERMINATION 1. This Letter Agreement shall be effective on the date it is executed by the last party to execute it and shall be effective for a period of one (1) year from the date of execution. 2. This Letter Agreement may be terminated by either party upon seven (7) days' written notice to the other should such other party fail substantially to perform in accordance with its material terms through no fault of the party initiating the termination. In the event of a termination for cause, the Consultant shall be entitled to receive compensation for any work completed pursuant to the Letter Agreement to the satisfaction of the City through the date of termination, less any amounts which the City reasonably deems necessary to withhold in order to correct any defects or deficiencies in the work performed by the Consultant. In no event shall LETTER AGREEMENT— CONSTRUCTION ADMINISTRATION Page 1 of 421 the City pay for profit or overhead on work not performed. 3. This Letter Agreement may be terminated by the City without cause upon ten (10) days' written notice to the Consultant. In the event of such a termination without cause, the Consultant shall be compensated for all services completed pursuant to this Letter Agreement to the satisfaction of the City up to and through the date of termination, together with Reimbursable Expenses incurred. In such event, the Consultant shall promptly submit to the City its invoice for final payment and reimbursement which invoice shall comply with the provisions of Section 2.5 of EXHIBIT "F" of the Continuing Services Agreement and Section F of this Letter Agreement. 4. Under no circumstances shall the City make payment of profit or overhead for work that has not been performed. Additionally, the City shall not make payment for the following items: a. Anticipated profits or fees to be earned on completed portions of the work; b. Consequential damages; c. Costs incurred in respect to materials, equipment or services purchased or work done in excess of reasonable quantitative requirements of this Letter Agreement; d. Expenses of Consultant due to the failure of Consultant or its subconsultants to discontinue the work with reasonable promptness after notice of termination has been given to the Consultant; e. Losses upon other contracts or from sales or exchanges of capital assets or Internal Revenue Code Section 1231 assets; and f. Damage or loss caused by delay. D. DELIVERABLES The Consultant will provide the deliverables more particularly set forth and described in EXHIBIT "1," which is incorporated herein and made a part hereof. E. SCHEDULE 1. The Consultant will commence work upon receipt of an executed Letter Agreement and shall perform its services as expeditiously as practical to meet the project schedule attached as EXHIBIT "1" to this Letter Agreement. 2. Upon receipt of the fully executed Purchase Order, the Consultant shall commence services to the City, and shall continuously perform services to the City, without interruption, in accordance with the time frames set forth in the "Project Schedule," a copy of which is attached and incorporated into this Letter Agreement as EXHIBIT "1." The number of calendar days from the Commencement Date, through the date set forth in the Project Schedule for completion of the Project or the date of actual completion of the Project, which ever shall last occur, shall constitute the Contract Time. LETTER AGREEMENT — CONSTRUCTION ADMINISTRATION Page 2 of 6 422 3. No Damages for Delay: The Consultant shall not be entitled to any claim for damages including, but not limited to, loss of profits, loss of use, home office overhead expenses, equipment rental and similar costs on account of delays in the progress of the Project from any cause or national disaster or emergency, unusual delay in deliveries, unusual delay in procuring permits, differing site conditions, unavoidable casualties or other cause beyond the Consultant's control, or by delay authorized by the City, or by other causes which the Consultant determines may justify delay. The Consultant's sole recovery and remedy for any such delay shall be a reasonable extension of time and a revision to the Project Schedule as determined by the City. However, additional costs to the Consultant or delays in the Consultant's performance caused by improperly timed activities shall not be the basis for granting a time extension. If the Consultant wishes to make a claim for an increase in time of performance, written notice of such claim shall be made to the City within three (3) working days after the occurrence of the event, or the first appearance of the condition giving rise to such claim. The City's representative shall determine whether the Consultant is entitled to a time extension for the delay. The failure of the Consultant to give such notice shall constitute a waiver of any claim under this section. F. COMPENSATION The City shall compensate the Consultant for an amount not to exceed Sixty -One Thousand Five Hundred Dollars and No Cents ($61,500.00) based on services rendered pursuant to Section B Scope of Services of this Letter Agreement by allocating the estimated percentage of work for each of the tasks set forth in Section F(2) below. Billing for each task shall not exceed the amount allocated to each phase. 2. Payment to the Consultant of the sum set forth in Section F(1) shall be allocated based on the estimated percentage of work completed for each of the following tasks: Task801...........................................................................................................$8,500.00 Task802.........................................................................................................$52,000.00 DirectExpenses...............................................................................................$1,000.00 G. BILLING AND PAYMENTS TO CONSULTANT 1. Billing by the Consultant shall be in accordance with the fee schedule in EXHIBIT "1" of this Letter Agreement. Payments to the Consultant shall also be in accordance with EXHIBIT "F" of the Continuing Services Agreement. H. KEY CONSULTANT PERSONNEL NAME FUNCTION Alex Lazowick President So long as the individual named above remains actively employed or retained by the Consultant, they shall perform the functions indicated next to their names. Furthermore, the City reserves the right to reject any proposed substitution for the above named LETTER AGREEMENT — CONSTRUCTION ADMINISTRATION Page 3 of 423 individual, and the City shall have the further right to require that any individual assigned to the Project by the Consultant be removed from the Project and reassigned for good cause. I. SEVERABILITY If any term or provision of this Letter Agreement or its application thereof to any person or circumstance shall, to any extent, be held invalid or unenforceable, the remainder of this Letter Agreement or the application of such terms or provisions to persons or circumstances other than those to which it is held invalid or unenforceable, shall not be affected, and every other term and provision of this Letter Agreement shall be deemed valid and enforceable to the extent permitted by law. IN WITNESS WHEREOF, the parties hereto have made and executed this Agreement on the respective dates under each signature: the City, signing by and through its Mayor, attested to by its City Clerk, duly authorized to execute same and by Keith and Associates, Inc. d/b/a Keith, signing by Alex Lazowick and through its President duly authorized to execute same. (SEAL) CITY CITY OF SU ISLES BEACH, FLORIDA By: Larisa Svechin, Mayor VC ,WV day of�etoberr, 2024. APPROVED AS TO FORM FOR THE CITY: .io, By: .4 Alain E. Boileau, for Nabors, Giblin & Nickerson, P.A., City Attorney [ADDITIONAL SIGNATURE PAGE TO FOLLOW] LETTER AGREEMENT —CONSTRUCTION ADMINISTRATION Page 4 of 6 424 CONSULTANT. KEITH AND ASSOCIATES, INC., d/b/a KEITH By: Alex Lazowick, .President ,141 day of nO'etolm; 2024. I % I I I A NP)f4w �6 AUTHENTICATE: \���` p,S S p 1/', P! O¢PORq�j�F� Sec Y SEAL n - L(yca, Please type name of Secretary (CORPORATE SEAL) LETTER AGREEMENT—CONSTRUCTION ADMINISTRATION Page 5 of 6 EXHIBIT "1" SCOPE OF SERVICES, PROJECT SCHEDULE, AND FEE SCHEDULE LETTER AGREEMENT — CONSTRUCTION ADMINISTRATION Page 6 of 6 426 Z1 KEITH Engineering Inspired Design. CONTRACT ADDENDUM WORK AUTHORIZATION PURSUANT TO THE CONTINUING PROFESSIONAL ENGINEERING SERVICES AGREEMENT BETWEEN THE CITY OF OF SUNNY ISLES BEACH AND KEITH AND ASSOCIATES, INC. (KEITH) July 29, 2024 WORK AUTHORIZATION NO. #02 Contract Addendum #02 TASK ORDER NO. (CITY No. TBD) PROJECT NO. 11723.02 (KEITH) PROJECT NAME: Intracoastal Sports Court Complex (formerly Ritz Sales Trailer Site) Project Location: 15800 Collins Ave., Sunny Isles Beach, FL 33160 DESCRIPTION OF ADDITIONAL SERVICES CONSTRUCTION ADMINISTRATION SERVICES Task 801 Bidding, Cost Estimate, and Selection Assistance KEITH will coordinate a Pre -application or Dry Run submittal with the City of Sunny Isles Beach Building Department and provide the documentation for plans review and approval by the City of Sunny Isles Beach. KEITH will respond to up to two (2) rounds of Building Department permit comments to obtain permit approval. If additional permits are required, KEITH will process them and the fees for these additional services will be submitted to CLIENT as additional services under a contract addendum if required. If permit comments generate a "principle" change to the design intent, KEITH will provide an additional service submitted to CLIENT under a contract addendum if required. KEITH will prepare a rough order of magnitude cost estimate based on the Construction Document plans. KEITH will look at similar project costs in the past and other readily available information for pricing. KEITH will meet and review with the CLIENT to ensure project stays within budget with the 100% deliverables. KEITH will attend required pre -bidding meetings with proposers having interest over the facilities designed by KEITH and prepare and submit the Bidding documents for construction and assist with the selection process. Deliverables 1. Coordinate and attend Building Permit Pre -Application (Permit Dry -Run) Meeting to review Construction Documents. 2. Assist the CLIENT and/or General Contractor in responding to Building Department Comments to obtain permit approval. 3. Provide Bid information to aid bidding process for comparable bids. 4. Answer Requests for Information if any arise during bidding process. 5. Review Bid Proposals and selection assistance. www.KEITHteam.com Pompano Beach (HQ) 9 Miami • West Palm Beach • Orlando • Port Saint Lucie 427 July 29, 2024 / Page 2 of 3 11723.02 — Intracoastal Sports Court Complex (formerly Ritz Sales Trailer Site) City of Sunny Isles Beach Contract Addendum #02 NOTE: Other specific permits are not anticipated and are NOT included in this task. If additional permits are required a contract addendum will be submitted to the CLIENT. Task 802 Construction Administration Construction Observation for Certification KEITH will provide construction services to ensure the integrity of the design intent and certify to the CLIENT and other jurisdictional agencies that the construction work has been completed in substantial compliance with the approved documents and permits. Any revisions or deviations to original construction documents, including but not limited to, substitutions and/or unforeseen conditions may impact schedule and will require additional fees. Services included are described as follows and are anticipated to take place in the time frame indicated in the "SCHEDULE" for CONSTRUCTION ADMINISTRATION SERVICES below. Shop Drawing Reviews KEITH will review required shop drawings, such as samples, product data, plant photos, and calculations, which the selected contractor is required to submit for review. This review will only be for conformance with the design concept of the project and compliance with the information provided on the design drawings and specifications. Such review will not extend to methods, means, techniques, construction sequence(s) or procedures, or to safety precautions and related programs. KEITH will also determine the acceptability, subject to CLIENT approval, of substitute materials and equipment proposed by contractors. Periodic Site Visits and Construction Observation KEITH will visit the Project at intervals appropriate to the various stages of construction, as KEITH deems necessary to observe as an experienced and qualified design professional to review the progress and quality of the various aspects of the contractor's work. KEITH will coordinate and attend one (1) Pre -construction Meetings. If required by the CLIENT, KEITH will attend or participate in CLIENT scheduled coordination and progress meetings or telephone conferences. The Contractor will coordinate through KEITH the scheduling of testing. KEITH will represent the CLIENT in performing periodic observation of construction as necessary to confirm construction is in accordance with the approved plans. KEITH will provide additional construction observations at the request of the CLIENT / Permit agencies due to unforeseen conditions or other circumstances. Additional construction observation services, Re -tests and failed inspections, will be invoiced on a time and material basis in accordance with KEITH Professional Service Fee schedule (attached). Issue Clarifications KEITH will issue all instructions and revisions of the CLIENT to Contractor(s); issue necessary interpretations and clarifications of the contract documents; have authority, to require special inspection or testing of the work; act as initial interpreter of the requirements of the contract documents and judge of the acceptability of the work there under, and make decisions on all claims of the CLIENT and contractor(s) relating to the acceptability of the work or the interpretation of the requirements of the contract documents pertaining to the execution and progress of the work. Engineering Inspired Design. 428 July 29, 2024 / Page 3 of 4 11723.02 — Intracoastal Sports Court Complex (formerly Ritz Sales Trailer Site) City of Sunny Isles Beach Contract Addendum #02 Meetings and Conference Calls KEITH will attend and or participate in periodic project meetings and conference calls as requested by the CLIENT and CITY. KEITH will review requests for information prepared by the Contractor and respond accordingly to all parties. KEITH will prepare drawings supplemental information needed to address the contractor's request for information. As-Builts Review KEITH will review the record drawings (as-builts) to ensure substantial conformance to the permitted plans twice. Additional reviews due to non-compliant As-builts submitted by the contractor, may impact schedule and will require additional fees. The contractor will be expected to have the as-builts revised in accordance with all comments. Final Inspections KEITH will participate with the CLIENT's representative, in a semi-final inspection for the purpose of determining if the project is substantially complete and participate in the preparation of a written "Punch List" of any defective or deficient items. KEITH will participate in a final inspection together with CLIENT and contractor representatives to verify "Punch List" items are complete, and in substantial conformance to the permitted plans. Additional inspections due to non-compliant Punch List item, may impact schedule and will require additional fees. Upon satisfactory completion of the final inspection, KEITH will certify the work has been completed in substantial conformance to the permitted plans, subject to any conditions therein expressed. Final Certifications KEITH will prepare final certification to all appropriate permitting agencies utilizing record drawings for the design from the survey information supplied by the contractor, or by other means agreed to by both KEITH and CLIENT. We anticipate the following items requiring as -built certification: • Water System • Sanitary Sewer System • Paving, Grading and Drainage System Note: Construction -related surveying (stakeout, as—built plans, etc.) and testing (densities, concrete, LBR'S, etc.) services are not included in this Agreement. Engineering Inspired Design. 429 1 July 29, 2024 / Page 4 of 5 11723.02 — Intracoastal Sports Court Complex (formerly Ritz Sales Trailer Site) City of Sunny Isles Beach Contract Addendum #02 PROJECT SCHEDULE Subsequent to the issuance of a Purchase Order from the CITY, CONSULTANT shall commence work on the project. We anticipate commencing work within 5 business days from notice to proceed, completing the prescribed work within 10 months. Table 1 Schedule Estimate of Engineering Services TASK DURATION Task 801 Bidding, Cost Estimate, and Selection Assistance 2 months Task 802 Construction Administration 8 months CITY'S RESPONSIBILITY The CITY shall assist CONSULTANT with the following items to expedite the completion of the project in an effective manner. A. Designate a representative(s) who shall have the authority to transmit instruction, receive information and enunciate policies and decisions. B. Provide access to and obtain permission for CONSULTANT to enter upon public lands as required at no additional cost to perform observations or other necessary services under this Agreement. C. Make available to CONSULTANT all existing information which may in anyway be pertinent to the project. D. Assist in contacting all permitting agencies to facilitate expediting reviews and/or approvals. ADDITIONAL SERVICES Consultant shall not perform any additional services without the written consent of the CITY. Services performed beyond the Scope of Services described above shall be considered additional services and will be presented to the CITY as an Addendum to this Agreement prior to initiating the work. Additional services shall be invoiced on a time and material basis in accordance with our current Professional Service Fee Schedule or on a lump sum basis if a scope of service can be defined. Engineering Inspired Design. 430 1 July 29, 2024 / Page 5 of 5 11723.02 — Intracoastal Sports Court Complex (formerly Ritz Sales Trailer Site) City of Sunny Isles Beach Contract Addendum #02 COMPENSATION Consultant shall invoice the City for services rendered under this Agreement on a lump sum basis, unless otherwise stated, and in accordance with the terms and conditions of the Continuing Services Agreement for Professional Engineering Services between the City of Sunny Isles Beach and KEITH. Table 2 Budget Estimate of Engineering Services "CITY": CONSULTANT: CITY OF SUNNY ISLES BEACH KEITH By: By: ALEX LAZOWICK President / CEO Engineering Inspired Design. 431 1 Task 801 Bidding, Cost Estimate, and Selection Assistance $8,500(Lump Sum Task 802 Construction Administration $52,000 (Hourly/Esti mate CONSULTANT'S TOTAL COMPENSATION $60,500 (Lump Sum) DIRECT EXPENSES 1 $1,000 (Time and Materials) TOTAL FEE $61,500 "CITY": CONSULTANT: CITY OF SUNNY ISLES BEACH KEITH By: By: ALEX LAZOWICK President / CEO Engineering Inspired Design. 431 1 � KEITH EXHIBIT A PROFESSIONAL SERVICE FEE SCHEDULE Effective 01/01/2021 www.KEITHteam.com pompano beach (HQ) a fort Lauderdale a miami e west palm beach e orlando a tallahassee 432 Hourly Rate ProjectExecutive......................................................................................................................... $350.00 ExpertWitness............................................................................................................................. $500.00 GovernmentLiaison..................................................................................................................... $400.00 Senior Project Manager...............................................................................................................$225.00 ProjectManager III....................................................................................................................... $175.00 ProjectManager II........................................................................................................................ $140.00 ProjectManager I......................................................................................................................... $120.00 AssistantProject Manager........................................................................................................... $100.00 Senior Traffic Engineer................................................................................................................ $175.00 TrafficEngineer............................................................................................................................ $125.00 EngineerIII.................................................................................................................................. $110.00 EngineerII................................................................................................................................... $100.00 EngineerI................................................................................................................................... $90.00 Senior Construction Manager...................................................................................................... $180.00 Construction Manager.................................................................................................................. $150.00 EngineeringInspector III.............................................................................................................. $125.00 EngineeringInspector II............................................................................................................... $100.00 EngineeringInspector I................................................................................................................ $90.00 ChiefSurveyor.............................................................................................................................$175.00 Senior Surveyor & Mapper.......................................................................................................... $150.00 ProjectSurveyor II.......................................................................................................................$125.00 ProjectSurveyor I........................................................................................................................ $110.00 TechnicianIII...............................................................................................................................$100.00 TechnicianII................................................................................................................................ $90.00 TechnicianI................................................................................................................................. $80.00 SeniorPlanner.............................................................................................................................$140.00 PlannerII....................................................................................................................................$120.00 PlannerI..................................................................................................................................... $100.00 SeniorLandscape Architect......................................................................................................... $150.00 LandscapeArchitect.................................................................................................................... $135.00 Arborist....................................................................................................................................... $140.00 LandscapeDesigner III................................................................................................................$125.00 LandscapeDesigner II.................................................................................................................$100.00 LandscapeDesigner I.................................................................................................................. $90.00 Chief Utility Coordinator............................................................................................................... $160.00 Senior Utility Coordinator............................................................................................................. $140.00 UtilityCoordinator........................................................................................................................ $100.00 Subsurface Utility Location Manager...........................................................................................$140.00 Subsurface Utility Field Supervisor.............................................................................................. $90.00 UtilityDesignating/GPR............................................................................................................... $200.00 SurveyCrew IV............................................................................................................................$160.00 SurveyCrew III............................................................................................................................ $130.00 SurveyCrew II............................................................................................................................. $110.00 SurveyCrew I.............................................................................................................................. $90.00 Survey Static Laser Scanning...................................................................................................... $250.00 Survey Terrestrial Mobile LiDAR............................................................................................ Per Project SurveyDrone Photos...................................................................................................................$200.00 Impervious Coring>8•..........................................................................................................$150.00/Each Vacuum Excavation Test Hole (Pervious Surface)....................................................$350.00/Each Vacuum Excavation Test Hole (Impervious Surface).................................................$450.00/Each Administrative Assistant II............................................................................................................ $80.00 Administrative Assistant I............................................................................................................. $60.00 Effective 01/01/2021 www.KEITHteam.com pompano beach (HQ) a fort Lauderdale a miami e west palm beach e orlando a tallahassee 432 CfTr QF 5lN. A�q City of Sunny Isles Beach 18070 Collins Avenue Sunny Isles Beach, Florida 33160 (305) 947-0606 City Hall (305) 949-3113 Fax MEMORANDUM TO: Honorable Mayor and City Commissioners VIA: Stan Morris, City Manager FROM: Rick Labinsky, P.E., City Engineer DATE: November 21, 2024 RE: Approval of an Agreement with Keith and Associates to Provide Construction Administration Services for the Intracoastal Sports Park RECOMMENDATION: Staff recommends approval of this Resolution. REASONS: Through Resolution No. 2022-3445, the City Commission approved an agreement with Keith and Associates for professional civil engineering and landscape architectural services to design the Intracoastal Sports Park. The design is complete and construction administration services are required during the construction process. Staff requests the approval of the attached agreement with Keith and Associates to perform Construction Administration services for the Intracoastal Sports Park in an amount not to exceed $61,500.00. FUNDING SOURCE: Funds have been appropriated in account no. 300-6-5720-465000-40005. ATTACHMENTS: Resolution Project Agreement Item Number: 91 418