Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Ernest Energy_ITB25-01-01_City of Sunny Isles Building Department Annex_BidPriceSheet
CITY OF SUNNY ISLES BEACH BUILDING DEPARTMENT RELOCATION TO ANNEX INVITATION TO BID 25-01-01 PROJECT NO. 21-1011 ROUGH ORDER OF MAGNITUDE 01/23/2025 no 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 BIDDERS MUST USE THS EXCEL SPREADSHEET TO SUBMIT PRICE SHEET. FAILURE TO SUBMIT THIS PRICE SHEET MAY RESULT IN NON-RESPONSIVE BID SUBMISSION. item GENERAL REQUIREMENTS SITE WORK Demolition Driveway Striping Plan/Resurface Landscaping Termite Treatment Testing Pavers Walk Way CONCRETE Pilings Foundation Concrete Flooring Pads and 2.5" Overlay Generator Pad Walls/Inter/Exter./Masonary MASONRY Masonary METALS Steel Ladder Details Canopy Details WOOD & PLASTIC Fencing/Gates Shelving Millwork Kitchen/Millwork THERMAL & MOISTURE PROTECTION TPO Roofing Dewatering Drainage Mat DOORS & WINDOWS Doors Windows FINISHES Ceiling Painting Kitchen Flooring SPECIALTIES Restrooms Break Room Lobby Interior Conference/Meeting Room EQUIPMENT Equipment Storage Office Trailer FURNISHINGS Lobby Lounge Furniture Clerk S Reception Furniture Business Center Supervisor Furniture Permit Supervisor Furniture Business Centre Admin Furniture Call Center Furniture Break Room Furniture Admin Workstation Furniture Private Offices OF - 1 Furniture Private Offices OF - 2 Furniture WKST-1 and WKST-2 WKST-3 and WKST-4 Storage Furniture Conference Room Furniture VIV Chairs - Replace Line Task Seating Aeron Task Seating Versus SPECIAL CONSTRUCTION Signage CONVEYING SYSTEMS Not Applicable for this scope of work MECHANICAL HVAC Equipment Air Distribution Underground Piping/Drainage Plumbing Fixtures Plumbing Equipment General Conditions Insulation ELECTRICAL Generator/ATS Distribution Equipment Feeders Site Lighting Site Lighting Branch Lighting Fixtures Lighting Branch Lighting Controls Devices Furniture/ Floor Duct Sytem Floorboxes Branch HVAC / Mechanical Circuits Teledata Conduit Teledata Wiring Fire Alarm Security/CCTV Access Control Lightning Protection Grounding General Conditions Sub Total Insurance % Bond % Overhead & Profit GRAND TOTAL = unit lump lump lump quantity price 0.01 0.007 0.05 $/sf subtotal 0 58500 28500 18500 3650 4500 30000 17000 160650 44500 75500 55000 13500 365000 553500 17500 17500 30500 14500 40500 85500 34500 25500 15500 75500 155000 13500 9500 178000 128500 112500 241000 65050 30000 18500 100000 213550 47500 18500 25500 19500 111000 17888.5 4100 6000 27988.5 8952.96 6078.9 5178.79 5453.38 12535.05 8595.21 20138.31 8220.32 22292.18 3933.94 19232.31 65833.28 14422.67 13412.58 22243.68 8377.6 15401.25 260302.41 28500 28500 0 125908.57 195945.65 5860.96 47398.56 11593.91 21217.38 44669.88 4129.59 456724.5 102529.99 20425.78 64089.99 1569.59 799.27 137311.07 12901.98 17007.46 19808.21 17385.54 5856 14324.47 13270.8 10902.46 32355.35 61453.99 2776.32 4108.45 23006.43 9685.66 3998.81 575567.62 2985283.03 29852.8303 20896.9812 149264.1515 3185296.993 342.2107