Tab 1 – Company Profile
Company Profile
MBR Construction, Inc. is a Florida Corporation
1020 NW 51 STREET
FORT LAUDERDALE, FL 33309
Current Principal Place of Business:
Current Mailing Address:
1020 NW 51 STREET
FORT LAUDERDALE, FL 33309 US
Entity Name: MBR CONSTRUCTION, INC.
DOCUMENT# P92000004585
FEI Number: 65-0373938 Certificate of Status Desired:
Name and Address of Current Registered Agent:
BOSS, MICHAEL R
1020 NW 51 STREET
FT. LAUDERDALE, FL 33309 US
The above named entity submits this statement for the purpose of changing its registered office or registered agent, or both, in the State of Florida.
SIGNATURE:
Electronic Signature of Registered Agent Date
Officer/Director Detail :
I hereby certify that the information indicated on this report or supplemental report is true and accurate and that my electronic signature shall have the same legal effect as if made under
oath; that I am an officer or director of the corporation or the receiver or trustee empowered to execute this report as required by Chapter 607, Florida Statutes; and that my name appears
above, or on an attachment with all other like empowered.
SIGNATURE:
Electronic Signature of Signing Officer/Director Detail Date
MICHAEL BOSS
FILED
Feb 17, 2025
Secretary of State
7776042266CC
WENDY COLE-BROCCOLI VICE 02/17/2025
2025 FLORIDA PROFIT CORPORATION ANNUAL REPORT
No
02/17/2025
Title DP
Name BOSS, MICHAEL
Address 1020 NW 51 STREET
City-State-Zip:FORT LAUDERDALE FL 33309
Title SECRETARY
Name COLE-BROCCOLI, WENDY
Address 1020 NW 51 STREET
City-State-Zip:FORT LAUDERDALE FL 33309
3/5/2025
February 27, 2025
MBR Construction Inc
1020 NW 51st St
Fort Lauderdale, FL 33309
RE: MBR Construction, Inc.
Surety: Liberty Mutual Insurance Company, A.M Best Rated
To Whom It May Concern:
Per your request for evidence of bondability, this letter is to advise you that MBR Construction, Inc. is set
up for bonding with Liberty Mutual Insurance Company.
Our company has bonded MBR Construction, Inc. for several years and have found them to be an
outstanding contractor, with a good reputation in the construction industry. Based on their past
experience, we have considered single jobs of $25,000,000.00 with an aggregate program of
$50,000,000.00 but this should not be construed as a maximum program amount.
If MBR Construction, Inc. has a low bid acceptable to all parties, if adequate financing is confirmed, and if
all other normal requirements are met, with surety approval, we look forward to providing a final bond on
this project.
As this is a letter of recommendation, and not a bid bond, Brown & Brown, Inc., Liberty Mutual Insurance
Company, their agents and owners accept no liability for its content. The Surety reserves the right to
review each submission and base their final decision upon conditions that exist at the time of request.
If we can be of additional assistance, please feel free to give us a call.
Sincerely,
Layne Holmes [Attorney-In-Fact & Florida Resident Agent]
This Power of Attorney limits the acts of those named herein, and they have no authority to
bind the Company except in the manner andto the extent herein stated.
LMS-12873 LMIC OCIC WAIC Multi Co 02/21Not valid formortgage,note,loan,letter ofcredit,currency rate, interest rate or residual value guarantees.For bond and/or Power ofAttorney(POA)verification inquiries,please call 610-832-8240 or email HOSUR@libertymutual.com.
Liberty Mutual Insurance Company
The Ohio Casualty Insurance Company
West American Insurance Company
POWER OF ATTORNEY
KNOWN ALL PERSONS BY THESE PRESENTS:That The Ohio Casualty Insurance Company is a corporation duly organized under the laws of the State of New Hampshire, that
Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts, and West American Insurance Company is a corporation duly organized
under the laws of the State of Indiana (herein collectively called the “Companies”), pursuant to and byauthority herein set forth, does hereby name, constitute and appoint,
IN WITNESS WHEREOF,this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed
thereto this
ssState of PENNSYLVANIA
County of MONTGOMERY
Company, The Ohio Casualty Company, and West American Insurance Company, and that he, as such, being authorized so to do, execute the foregoing instrument for the purposes
therein contained by signing on behalf of the corporationsby himself as a dulyauthorized officer.
IN WITNESS WHEREOF,I have hereunto subscribed my name and affixed my notarial seal at King of Prussia, Pennsylvania, on the day and year first above written.
This Power of Attorney is made and executed pursuant to and by authority of the following By-laws and Authorizations of The Ohio Casualty Insurance Company, Liberty Mutual
Insurance Company, and West American Insurance Companywhich resolutions are now in full force and effect reading as follows:
By:
David M. Carey, Assistant Secretary
By:
Teresa Pastella, Notary Public
Renee C. Llewellyn, Assistant Secretary
By:
ARTICLE IV – OFFICERS:Section 12. Power of Attorney.
Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject to such limitation as the Chairman or the
President may prescribe, shall appoint such attorneys-in-fact, as may be necessary to act in behalf of the Corporation to make, execute, seal, acknowledge and deliver as surety
any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys-in-fact, subject to the limitations set forth in their respective powers of attorney, shall
have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so executed, such
instruments shall be as binding as if signed by the President and attested to by the Secretary. Any power or authority granted to any representative or attorney-in-fact under the
provisions of this article may be revoked at any time by the Board, the Chairman, thePresident or by the officer or officers granting such power or authority.
ARTICLE XIII –Execution of Contracts:Section 5. SuretyBonds and Undertakings.
Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe,
shall appoint such attorneys-in-fact, as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings,
bonds, recognizances and other surety obligations. Such attorneys-in-fact subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the
Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be as binding as if
.,day of
,day ofOn this before me personally appeared David M. Carey, who acknowledged himself to be the Assistant Secretary of Liberty Mutual Insurance
Liberty Mutual Insurance Company
The Ohio Casualty Insurance Company
West American Insurance Company
execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations, in pursuance
of these presents and shall be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper
persons.
all of the city of state of each individually if there be more than one named, its true and lawful attorney-in-fact tomake,
Certificate No:
James F.
Murphy, Layne Holmes, Michael A. Holmes, Michael Gorham
25th 2022March
25th 2022March
signed by the president and attested by the secretary.
Certificate of Designation – The President of the Company, acting pursuant to the Bylaws of the Company, authorizes David M. Carey, Assistant Secretary to appoint such attorneys-in-
fact as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety
obligations.
Authorization – By unanimous consent of the Company's Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the
Company, wherever appearing upon a certified copy of any power of attorney issued by the Company in connection with surety bonds, shall be valid and binding upon the Company with
the same force and effect as though manually affixed.
I, Renee C. Llewellyn, the undersigned, Assistant Secretary, The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company do
hereby certify that the original power of attorney of which the foregoing is a full, true and correct copy of the Power of Attorney executed by said Companies, is in full force and effect and
has not been revoked.
IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this 27 day of February 2025.
FORT LAUDERDALE FL
8207562-972124
Tab 2 - Qualification
Company History and Experience
The MBR Construction, Inc. Team provides a powerful combination of knowledge, talent and
skill to their clients, based on the principle of dedication to unmatched client service and
integrity to the entire construction process.
The firm structure revolves around the core team concept of working directly and continuously
with each client regardless of what stage the project may be through completion. Staff
members are assigned based on their specific relevant experience. Each project approach is
tailored to client's objectives.
MBR Construction proposes personnel with the experience needed to meet and exceed the
requirements to complete your project successfully and they are ready and available to work
with the City of Sunny Isles Beach.
Michael R. Boss, Project Director and point of contact, brings the team his comprehensive
experience with construction and business management gained in South Florida in the past
twenty-eight years. After graduating from college, Michael worked for his father ‘s construction
company working on public works construction, which benefited greatly from the addition of
his strong technical and management skills. Michael has a proven talent for working through
the many levels of details necessary for a construction project’s success and gives all clients of
MBR Construction an unswerving dedication to service and honesty. Michael is known as an
outstanding contractor, spending much of his time out in the field building and improving
recreational and athletic facilities throughout South Florida.
Vilma Rodriguez, Project Manager, brings strong management and technical skills to the
design-build team; gained through Twenty-six years of experience in the construction field
which include fourteen years as a Project Manager with MBR Construction building numerous
new parks, recreational, athletic facilities and Municipal buildings.
Vilma Rodriguez works directly with Michael Boss and her role for your project will be as Project
Manager. She will be part of the design reviews and during the permitting phase of your project
will ensure the process moves without a hitch, carefully reviewing documents before submittal.
Vilma is very experienced with the permitting process and agency reviews.
Once the Sub-contracts are issued, she is responsible for managing all the subcontractors’
contracts, the flow of all payment’s applications and related paperwork from sub-contractors,
sub-consultants and client, gathering the required documentation for the project and reviews
its compliance.
During the construction phase, she will be responsible for keeping a file and maintaining the
flow of all project records, including as-builts, construction testing reports, inspection logs, and
weekly reports, and ensuring that they are kept up to date by the project superintendent. Vilma
is also responsible for schedule controls by maintaining schedules up to date, ensuring
timelines of the shop drawings submittal process, keeping all logs and meeting minutes
updated, managing the flow of all RFI’s, and correspondence between MBR Construction and
client, sub-contractors and sub-consultants.
Company History and Experience
During the final stage of the project, she will be responsible for putting together a complete
close out package that includes all projects operational and maintenance manuals, warranties,
Architectural and Civil As-builts, final survey, final inspection reports, certificate of occupancy
and any other documentation required.
Leon Woloch, Construction Manager, has twenty-five years of hands-on experience in
residential, commercial and public works projects in South Florida. These experiences have
contributed to his intimate knowledge of construction techniques, which, combined with his
dedication to professional project supervision, helps MBR Construction complete projects on
time and within the agreed-upon budget. Since Leon started with MBR Construction ten years
ago he has already completed similar projects, The CHS Healthcare for the Homeless Clinic and
CHS Specialty Care Center Interior Renovations, Wellington Boys and Girls Club, Long Key Nature
Center, Tradewinds Park Administration Building, Deicke Auditorium Building Renovations, Sunrise
Village Multipurpose Center, Wilton Manors City Hall & Police station.
This carefully selected Design-Build Team provides a powerful combination of knowledge,
talent and skill to their clients, based on the principle of dedication to unmatched client service
and integrity to the entire design build process, including the frank and honest disclosure of
project costs, and a fresh approach to construction projects through the design-build process.
SIMILAR PAST PROJECT EXPERIENCE
1. DESIGN BUILD SERVICES FOR JOHNNY L TIGNER COMMUNITY CENTER – (2024)
The project involved the demolition of the existing one-story Johnny L. Tigner Community Center,
which was replaced by a new two-story concrete Tilt-wall building. The new structure had a total
area of 20,275 square feet and a total height of 32’-2”. The first floor covered 10,452 square feet,
while the second floor spanned 9,823 square feet. The building was located near the existing Leo
Robb Gymnasium, and as part of the design, a canopy or covered structure was included to provide
sheltered access between the two facilities.
In addition to the new building, the scope of work included several upgrades to the existing
gymnasium. These upgrades involved the installation of a new fire alarm system, modifications to
the sprinkler system, and the addition of a new Bi-Directional Amplifier (BDA) system to enhance
communication capabilities. Site improvements were also a major component of the project, with
enhancements made to the surrounding sidewalk area. A new drop-off/pick-up zone was created
for easier access, and the parking lot underwent major improvements to better accommodate
visitors and ensure safety and convenience.
The project successfully provided modernized facilities for the community, improving connectivity
between the new and existing buildings, enhancing safety systems, and creating a more functional
site layout.
Original Contract Amount: $ 10,916,547.02 Final Contract Amount: $ 11,723,200.53
Client: City of Deerfield Beach Contact: Zannetha Newel, Project Manager
Telephone: 561 895 0087 Email: znewell@deerfield-beach.com
SIMILAR PAST PROJECT EXPERIENCE
2. SUNRISE ATHLETIC COMPLEX RENOVATION – (2022)
Scope of Work: This project includes site
demolition, site utilities improvements,
construction of a new 15,000 SF Multi-
purpose Center, a metal structure to
house five basketball courts, new
parking lot, resurfacing of existing
tennis courts, new playground, new
Concession building, new scoreboard
towers, new sports lighting, new
security and technology systems,
refurbish full size multipurpose fields, renovations to existing meeting hall and restroom
facilities, new landscaping and Irrigation.
Original Contract Amount: Final Contract Amount:
Client: Contact:
Telephone: Email: mkaufold@sunrisefl.gov
SIMILAR PAST PROJECT EXPERIENCE
3. SUNRISE CITY PARK – (2020)
Scope of Work: The new and improved City Park, re-opened in November 2020, brings
impressive and contemporary park amenities to Sunrise’s original neighborhoods in the
east. This 5.5 acre leisure space was funded by park bonds overwhelmingly approved
by Sunrise voters as part of our long-term vision to foster a connected and engaged
community. The park construction included the renovation and expansion of the
existing parking lot, an expansive 140-yard multipurpose field for community events,
concerts, and a variety of sports, a new quarter-mile walking path featuring seven
outdoor exercise stations, a custom metal structure to serve as a covered amphitheater
stage, two covered event rental pavilions with gas grills, a soccer-themed 2,500 SF splash
pad and sun-shaded playground, three full covered outdoor basketball courts with
professional rims and backboards, two newly-resurfaced regulation tennis courts,
.
Original Contract Amount: Final Contract Amount:
Client: Contact:
Telephone: Email: mkaufold@sunrisefl.gov
SIMILAR PAST PROJECT EXPERIENCE
4. EVERGLADES HOLIDAY PARK IMPROVEMENTS – (2021)
Scope of Work: This project is located at 21940 Griffin Road in Unincorporated Broward
County. The work under this contract includes extensive renovations to the Park’s
existing site elements and infrastructure including: demolition, clearing & grubbing,
earthwork, storm water pollution prevention, storm water drainage system, fire
protection pump system, fire protection piping and hydrants, potable water service,
grinder pump station, sewer force main, asphalt pavement, pavement markings and
signage, concrete sidewalks & curbs, stamped concrete drive, site electrical service, site
lighting, dock pilings, auger cast pilings, fixed & floating docks, stone rip-rap stabilized
shoreline, steel sheet piling bulkhead, boat ramps, levee flood wall, new buildings, tree
removals & relocations, landscape & irrigation, fencing and several optional bid items.
This project bares a high level of difficulty, entailing phasing and intricate coordination,
in order to maintain uninterrupted operations to the Everglades Holiday Park business
operations and guide visitors safely thru the park. The Everglades Holiday Park
maintains a high volume of visitors to the South Florida Alligator Park which is a top
attraction for locals and visitors alike to experience the Gator Boys Alligator Rescue
presentation and hoping onto an airboat to zip across the River of Grass which is the
Everglades.
Original Contract Amount: Final Contract Amount:
Client: Contact:
Telephone: Email:
SIMILAR PAST PROJECT EXPERIENCE
5. DESIGN BUILD SERVICES FOR CAPORELLA PARK – (2023)
The scope of work included increasing the parking lot capacity by adding four more parking
spaces and an additional handicapped space. A new entry plaza to welcome visitors, and a 1,200
square feet Restroom & Concessions Building.
In addition to these improvements, a 1/3 of a mile long concrete 8’ wide multipurpose trail was
developed, leading to all the park amenities. These amenities comprise a dedicated area with
10 fitness stations, complete with shade for users. A 5,000 square feet playground featuring
universal-access equipment and a shade structure which provides a safe and enjoyable space
for children.
A 40x40 Picnic Shelter was constructed, equipped with picnic tables and BBQ grilles for park
visitors to enjoy outdoor meals. The project also included the installation of a stage and
amphitheater, featuring a 2,500 square feet tensile structure stage along the edge of the lake.
A grass amphitheater/plaza area for spectators overlooking the expansive lake, serving as a
picturesque backdrop for events.
Furthermore, enhancements to recreational features included a fishing pier, accessible from the
new multipurpose walking trail. The pier has added lighting for better visibility. Additionally, a
new non-motorized boat launch with a floating deck was established, providing ADA direct
access from the primary parking lot.
Original Contract Amount: Final Contract Amount:
Client: Contact:
Telephone: Email:
SIMILAR PAST PROJECT EXPERIENCE
6. DESIGN BUILD SERVICES FOR WATERS EDGE PARK – (2020)
Our recently completed project stands as a testament to the successful design and
construction of a vibrant 6-acre community park, seamlessly blending recreational
elements to create a dynamic space for residents of all ages. The park features a 1,000-
square-foot restroom/storage/IT room building, providing essential facilities in a modern
and aesthetically pleasing structure. A 9-foot-wide concrete walkway connects key
amenities, ensuring accessibility throughout the park.
Recreational options abound with a full-size basketball court meeting NFHS standards, a
sand volleyball court, and covered exercise ADA stations promoting physical fitness. Two
24-foot hexagonal shelters offer shaded spaces for gatherings, while a 3,000-square-foot
splash pad, a fishing pier and a 4,000-square-foot playground cater to families and
children. The park's thoughtful design incorporates site furnishings such as benches and
tables strategically placed for convenience.
The project also includes a well-designed parking area, fencing for safety and security,
and a comprehensive lighting plan illuminating pathways and key areas during evening
hours. Thoughtful landscaping, including green spaces and trees, adds to the park's visual
appeal and sustainability.
Original Contract Amount: Final Contract Amount:
Client: City of Tamarac Contact: Dibb Machuca, Project Manager
Telephone: Email:
SIMILAR PAST PROJECT EXPERIENCE
7. FLAMINGO PARK – (2020)
Scope of Work:
Client: Contact:
Telephone: Email:
Original Contract Amount: Final Contract Amount:
Tab 3 - Staffing
ORGANIZATIONAL CHART of the MBR CONSTRUCTION'S KEY PERSONNEL
PROPOSER
MBR CONSTRUCTION
Michael R. Boss, President
ACCOUNTING Principal in Charge ESTIMATING/PURCHASING
Wendy S. Cole Edward Broccoli
Office Accountant / Office Manager Senior Estimator
Leslie Zayas PROJECT MANAGEMENT Tom Koch
Cost control analyst Thaddeus L. Cohen, PA Estimator
Project Management Director Federica Douaihi
SITE MANAGEMENT Estimator/Purchasing Agent
Construction Manager
Leon Woloch PROJECT MANAGENT
Jason Cameron Vilma Rodriguez, Civil Engineer
Site Work Superintendents Project Manager ADMINISTRATIVE ASSISTANTS
Aran Castillo Federica Douaihi Jesus Rodriguez
Eric Boss Project Manager Assistant Project Manager
Superintendents Yaesolji Shin Paola A. Koch
Phil Kemp Project Manager Administrative Assistant
Waldemar Douaihi Dannielle Devore
Project Manager
ITB 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
MICHAEL R. BOSS
PRINCIPAL IN CHARGE
1020 NW 51ST Street, Fort
Lauderdale, FL 33309 (954) 486-8404 mboss@mbrconstruction.com
OVERVIEW
Michael Boss is President and one of the founders of MBR Construction. He has an extensive
background in construction, with over 35 years’ experience in South Florida and is currently the Principal
in Charge and a licensed General Contractor for MBR Construction.
Although Michael oversees a team of very highly qualified project managers, he has always been a
“hands on” owner and will be the Project Manager and point of contact on this project. Michael’s main
priority on this project will be to maintain a tight schedule, and that throughout the project construction
phase, the Utilities Department staff and operations are minimally impacted by the construction
activities.
Among his many qualifications, it is relevant to mention his extensive experience in leading our team in
the coordination and completion of numerous Design Build Projects. Michael has a proven talent for
working through the many levels of details necessary for a construction project’s success and will give
you an unswerving dedication to service and honesty.
EXPERIENCE
2012 to 2013
2018
2018
1998 to 2020
2002 ‐2013
Village of Wellington
$3.4 million Boys and Girls Club Building
City of Deerfield Beach
$1.6 Cove Gardens Neighborhood Improvements
$3.8 million Sullivan Park (New development)
City of Coconut Creek
$4.6 million Windmill Park Improvements
Broward County Parks & Recreation Division
$10 million Everglades Holiday Park Improvements
$2 million Design Build Sunview and Tree Tops Park Improvements.
$7 million Design Build Long Key Nature Center and Maintenance
Building (new development)
$10 million Design Build District 2 Renovations for Quiet Waters Park,
Tradewinds Park, North Broward Park and Deerfield Island
$3 million Design Build Miramar Pinelands Natural Area (new
development)
$7 million Vista View Park Expansion (New development)
City of Plantation
Design Build Deicke Auditorium Building Renovations.
2009 to 2020
2000 to 2020
2000 to 2015
2017‐2018
2000 to 2015
2000 to 2015
2000 to 2015
City of Pompano Beach
$4.1 million Pompano Community Park Fazes II
$2.6 million Pompano Community phase III
Various park improvements to Mitchell Moore Park, Cresthaven Park
Improvements, Golf Course Shelter & Restroom Renovations.
$1.6 million CM@Risk services for Palm Aire Park
$1.4 million new construction of Ali Cultural Center
$1 million new construction of ETA NU Education Facility
City of Sunrise
$6.5 million Sunrise City Park Improvements
$5 million Flamingo Park Improvements
$5 million Sunrise Village Multipupose Center
$4.2 million Construction services for Cypress Preserve and Oak
Hammock Passive Parks to build two new passive park sites.
Shotgun Road and Panther Parkway Linear Park, Sunset Strip Façade,
Sunrise Roller Hockey Complex, Oakland Park Streetscape
Improvements, Sunrise Lakes Entry Features, Sunrise Civic Center
Family Pool, Sunset Strip Neighborhood Park, Pine Island Streetscape,
Spring Tree Utility Complex.
City of Fort Lauderdale
$1.7 million 15thStreet Boat Launch and Marine Complex
Harbor Beach Entrances and Roadway Improvements, Lincoln Park,
Sunset Memorial Gardens, NE 33rd Avenue Neighborhood
Improvements, Downtown Helistop Staircase Replacement, George
English Park Administration Building, City Park Garage Rehab,
Riverwalk South Regional Park, Peter Feldman Park, Bill Keith
Preserve Renovations , Fort Lauderdale Beach Park, Harbordale Park,
South Middle River Park, Floyd Hull Stadium Facility Improvements,
Flagler Greenway Trail, Southside School Redesign –South Esteriors.
City of Delray Beach
$2.3 million Delray Beach Master Plan Phase 1
$3.3 million Delray Beach Master Plan Phase 2
City of Dania Beach
$1.6 million Revitalization of Ocean Park ‐ Phase I
City of Weston
$2.3 million Indian Trace Park Improvements
$1.9 million Peace Mound Park Improvements
City of Cooper City
$5.2million Flamingo West Park
VILMA RODRIGUEZ
PROJECT MANAGER
1020 NW 51ST Street, Fort
Lauderdale, FL 33309 (954) 486-8404 mboss@mbrconstruction.com
OVERVIEW
Ms. Rodriguez has twenty‐five years’ experience as a project manager 17 of them with MBR
Construction, Inc. as a Project manager for numerous recreational, athletic facility projects. As the
project manager she is the primary client liaison, during phase 1 Vilma will coordinate the construction
documents with the existing site conditions, will coordinate with MBR Construction, Inc.
estimating/value engineering team to provide a GMP and cost estimates/value engineering suggestions
at various phases of the design process, will be part of the design reviews and during the permitting
phase of your project will ensure the process moves without a glitch, carefully reviewing documents
before submittal. Ms. Rodriguez is very experienced with the permitting process and agency reviews.
Once the Sub‐contracts are issued, she is responsible for managing all the subcontractor’s contracts, the
flow of all payments applications and related paperwork from sub‐contractors, sub‐consultants and
client, gathering the required documentation for the project and reviews its compliance.
During the construction phase, she will be responsible for keeping a file and maintaining the flow of all
project records, including as‐builts, construction testing reports, inspection logs, and weekly reports,
and ensuring that they are kept up to date by the project superintendent. Vilma is also responsible for
schedule controls by maintaining schedules up to date, ensuring timelines of the shop drawings
submittal process, keeping all logs and meeting minutes updated, managing the flow of all RFI’s, and
correspondence between MBR Construction and client, sub‐contractors and sub‐consultants.
During the final stage of the project she will be responsible for putting together a complete close out
package that includes all projects operational and maintenance manuals, warranties, Architectural and
Civil As‐builts, final survey, final inspection reports, and certificate of occupancy.
EXPERIENCE
2012 to 2013
2007‐2020
Village of Wellington
$3.4 million Boys and Girls Club Building
Broward County Parks & Recreation Division
Vilma Rodriguez has managed the Master Agreement Park
Improvements and Construction Continuing Contract held by MBR
Construction for the past 9 years.
$2 million Design Build Sunview and Tree Tops Park Improvements.
$7 million Design Build Long Key Nature Center and Maintenance
Building (new development)
$10 million Design Build District 2 Renovations for Quiet Waters Park,
Tradewinds Park, North Broward Park and Deerfield Island
$3 million Design Build Miramar Pinelands Natural Area (new
development)
$7 million Vista View Park Expansion (New development)
2018
2013‐2015
2002 ‐2013
2009 to 2020
2000 to 2015
2000 to 2015
2019
2008‐2018
City of Coconut Creek
$4.6 million Windmill Park Improvements
City of Plantation
Design Build Deicke Auditorium Building Renovations.
$2.1 million Energy Efficiency Team Center
City of Pompano Beach
$4.1 million Pompano Community Park II
$2.6 million Pompano Community phase III
$1.6 million CM@Risk services for Palm Aire Park
City of Sunrise
$6.5 million Sunrise City Park Improvements
$5 million Flamingo Park Improvements
$5 million Sunrise Village Multipupose Center
$4.2 million Construction services for Cypress Preserve and Oak
Hammock Passive Parks to build two new passive park sites.
$1.6 millionSpring Tree Utility Complex.
$2 million Civic Center Family Pool
City of Fort Lauderdale
Harbor Beach Entrances and Roadway Improvements
Sunset Memorial Gardens
NE 33rd Avenue Neighborhood
Riverwalk South Regional Park
Fort Lauderdale Beach Park, Harbordale Park, South Middle River P
City of Wilton Manors
$7.3 million Design Build City Hall and Police Station,
$1.6 million Design Build Richardson Historic Park
City of Tamarac
$4.1 million Design Build Services Waters Edge Park
Broward County Sheriff’s Office
$4 million CM@Risk services for North Broward Jail Improvement
Detention Renovations
Continuing Design Build Services for Broward Sheriff’s Office
include projects ranging from $0 to $500,000 budgets: Juvenile
Assessment Center Renovation, Pompano Jail Renovations,
Headquarters Building Renovations, Internal Affairs Bureau
Renovations, Tactical Training Center Renovations, Main Jail ADA
Elevator Addition and Cooper City Sub‐station Renovations.
LEON WOLOCH
CONSTRUCTION MANAGER
1020 NW 51ST Street,
Fort Lauderdale, FL
33309
(954) 486-8404 lwoloch@mbrconstruction.com
OVERVIEW
Leon Woloch is one of our most valued Construction Managers. He has an extensive background in
construction with over 25 years experience in South Florida and 15 years working for MBR Construction,
Inc.
Before working for MBR Construction, Leon worked as one of the superintendents working to construct
the Sawgrass Mills, and he also completed three new bank buildings for the First America Bank.
The bulk of his experience with MBR Construction has been a combination of Design Bid Build and Design
Build Services and his skills, his hands on approach and his firsthand knowledge of construction have made
all his projects successful ones.
Mr. Woloch takes pride in his ability to control the quality of the work and puts high priority on the
project schedule. Job safety is also high on his list of priorities, and he maintains weekly construction
safety training meetings.
Another one of his many good qualities is the cleanliness of his job site and this is one that most clients
notice and praise.
EXPERIENCE
2012 to 2013
2005 to 2020
2013
2000 to 2019
Village of Wellington
$3.4 million Boys and Girls Club Building
Broward County Parks & Recreation Division
$10 million Everglades Holiday Park Improvements
$7 million Design Build Long Key Nature Center and Maintenance
Building (new development)
$10 million Design Build District 2 Renovations for Quiet Waters Park,
Tradewinds Park, North Broward Park and Deerfield Island
City of Plantation
Design Build Deicke Auditorium Building Renovations.
City of Sunrise
$5 million Flamingo Park Improvements
$5 million Sunrise Village Multipupose Center
$4.2 million Construction services for Cypress Preserve and Oak
Hammock Passive Parks to build two new passive park sites.
Pine Island Streetscape, Spring Tree Utility Complex.
2000 to 2015
2017
2015
2015
2018‐2019
City of Fort Lauderdale
$1.7 million 15thStreet Boat Launch and Marine Complex
Downtown Helistop Staircase Replacement
City Park Garage Rehab
Southside School Redesign
City of Dania Beach
$1.6 million Revitalization of Ocean Park ‐ Phase I
Broward Health
$2 million CHS Healthcare for the Homeless Clinic (14,000 SF new
construction) and CHS Specialty Care Center Interior Renovations.
City of Wilton Manors
$7.3 million Design Build Wilton Manors City Hall & Police station
(35,000 SF new constructions)
City of Tamarac
$4.1 million Design Build Waters Edge Park
Tab 4 – Approach / Methodology
APPROACH AND METHODOLOGY/
SCHEDULING AND COST CONTROLS
APPROACH AND METHODOLOGY/
SCHEDULING AND COST CONTROLS
APPROACH AND METHODOLOGY/
SCHEDULING AND COST CONTROLS
APPROACH AND METHODOLOGY/
SCHEDULING AND COST CONTROLS
APPROACH AND METHODOLOGY/
SCHEDULING AND COST CONTROLS
Warranty Phase
Substantiation
Tab 5 – Corporate Standing and Authorized
Signatory
Tab 6 – Litigation History
MBR CONSTRUCTION - LITIGATION
5 Year Period 3/5/2020 through 3/4/2025
Incidental Cases
Disposition Date Filing Date State County Venue Court Type Case Number Case Style Description Notes Party Type Status Disposition
10/19/2023 3/8/2023 FL Broward County Civil COSO23001629 Bellsouth Telecommunications LLC (dba AT&T) vs. MBR Construction Insurance Claim Fiber cut Defendant Disposed Settled; Dismissed w/ Prejudice
2/3/2022 9/17/2021 FL Broward County Civil COSO21009046 Bellsouth Telecommunications LLC (dba AT&T) vs. MBR Construction Insurance Claim Fiber cut Defendant Disposed Settled; Dismissed w/ Prejudice
6/17/2021 8/23/2019 FL Palm Beach County Civil 50-2019-CA-010979-XXXX-MB Herman, Brandon vs. MBR Construction Inc Insurance Claim slip and fall Defendant Closed Settled; Dismissed w/ Prejudice
10/14/2022 10/1/2021 FL Palm Beach County Civil 50-2021-CA-011277-XXXX-MB Stowell, Jesse Kenneth vs. MBR Construction Inc Insurance Claim slip and fall Defendant Closed Settled; Dismissed w/ Prejudice
4/21/2022 1/27/2021 FL Miami-Dade County Civil 2021-002093-CA-01 John Carey vs. HMC Helicopter Service LLC et al Insurance Claim A helicopter hired to transport
materials into a remote project
location crashed during transport.
Defendant Closed Settled; Dismissed w/ Prejudice
Material Cases
Disposition Date Filing Date State County Venue Court Type Case Number Description Notes Party Type Disposition
N/A
Tab 7 – Forms and Attachments
REFERENCES & PROJECTS
29
ITB 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
CITY OF SUNNY ISLES BEACH
18070 Collins Ave. | Sunny Isles Beach, FL 33160
305.792.1707 | sibfl.net | Purchasing@sibfl.net
QUALIFICATION REQUEST
INCLUDE WITH YOUR BID
Contractor must list projects of similar project scope fulfilling the following qualification requests:
1. List Project Management Personnel. Personnel cannot be changed without written approval.
Project Manager
2. How many years has your organization been in business as a Contractor?
3. List current workload.
4. Is the bidder subcontracting any part of this work? If so, give details to major key subcontractor’s
name, address, phone number and type of work to be performed. Also, indicate the percentage of
the total work to be performed by the subcontractor. List current workload of major sub-
contractors.
5. The business is a (sole proprietorship) (partnership) (corporation) and name of owner:
Addendum #5
30
ITB 25-01-01 CITY ANNEX BUILDING CONSTRUCTION RENOVATIONS
CITY OF SUNNY ISLES BEACH
18070 Collins Ave. | Sunny Isles Beach, FL 33160
305.792.1707 | sibfl.net | Purchasing@sibfl.net
6. Has your company ever been debarred or terminated for default on a government contract?
Has an agency (Owner) submitted a claim against your performance bond with the surety company?
7. Identify your debris disposal plan.
8.Bidder must list any exceptions taken to the terms and condition in this ITB.
9. Discuss what strategies the submitter will utilize to keep this project on schedule, considering
long lead-times on fabrication.
10. Discuss strategies the submitter will implement to ensure the project is kept on budget.
Addendum #5
Tab 8 – Bid Price Sheet